October 28, 2010 – Tri-State Generation and Transmission Assoication, Inc. and New Mexico Mining Association v. John D’Antonio, Jr., New Mexico State Engineer, No. 27,802

27,802Nmctapp

Gesamter Gesetzestext

IN THE COURT OF APPEALS OF THE STATE OF NEW MEXICO
Opinion Number: __________
Filing Date: October 28, 2010
NO. 27,802
TRI-STATE GENERATION AND
TRANSMISSION ASSOCIATION, INC.
and NEW MEXICO MINING ASSOCIATION,
Petitioners-Appellees,
v.
JOHN D’ANTONIO, JR.,
NEW MEXICO STATE ENGINEER,
Respondent-Appellant.
APPEAL FROM THE DISTRICT COURT OF SOCORRO COUNTY
Matthew G. Reynolds, District Judge
Rodey, Dickason, Sloan, Akin & Robb, P.A.
Sunny J. Nixon
James P. Bieg
Soha F. Turfler
Santa Fe, NM
for Appellees
Gary K. King, Attorney General
Stephen R. Farris, Assistant Attorney General
Frances C. Bassett, Assistant Attorney General
Judith Ann Moore, Assistant Attorney General
Santa Fe, NM
New Mexico Office of the State Engineer
John D’Antonio, Jr., State Engineer
DL Sanders, Special Assistant Attorney General
Santa Fe, NM
Sutin, Thayer & Browne, P.C.
Paul Bardacke, Special Assistant Attorney General
Peter S. Kierst, Special Assistant Attorney General
Kimberly M. Bannerman, Special Assistant Attorney General
Albuquerque, NM
for Appellant
Hennighausen & Olsen, L.L.P.
A.J. Olsen
Fred H. Hennighausen
Alvin F. Jones
Roswell, NM
Richard A. Simms
Hailey, ID
for Amicus Curiae Pecos Valley Artesian Conservancy District
Adolfo J. Méndez II, Assistant General Counsel/Special Assistant Attorney General
Santa Fe, NM
for Amicus Curiae New Mexico Environment Department
Hubert & Hernandez, P.A.
Lee E. Peters
Las Cruces, NM
for Amicus Curiae New Mexico Cattle Growers’ Association
Hubert & Hernandez, P.A.
Steven L. Hernandez
Las Cruces, NM
for Amicus Curiae Carlsbad Irrigation District
Hubert & Hernandez, P.A.
Beverly J. Singleman
Las Cruces, NM
for Amicus Curiae Elephant Butte Irrigation District
Davidson Law Firm, LLC
Tessa T. Davidson
Tatiana D. Engelmann
Corrales, NM
for Amicus Curiae New Mexico Pecan Growers
Victor R. Marshall & Associates, P.C.
Victor R. Marshall
Albuquerque, NM
for Amici Curiae San Juan Agricultural Water Users Association, the Hammond
Conservancy District, and the Acequia Landowners Association of the Lower
Rio Grande
Christopher D. Shaw, Special Assistant Attorney General
Tanya M. Trujillo, Special Assistant Attorney General
Santa Fe, NM
for Amicus Curiae New Mexico Interstate Stream Commission
OPINION
BUSTAMANTE, Judge.
{1} 	We are presented in this case with a challenge to the validity of 19.25.13.27
NMAC (12/30/2004) and 19.25.13.30 NMAC (12/30/2004) of the Active Water
Resource Management (AWRM) Regulations promulgated by the State Engineer.
The dispute centers on aspects of the regulations that contemplate the administration
of water rights through the determination and enforcement of priority. The district
court overturned portions of the two regulations at issue because it found that they
impermissibly expanded the scope of the State Engineer’s statutory authority and
violated due process protections. We hold that 19.25.13.27 NMAC, the regulation
addressing the State Engineer’s determination and enforcement of priority, in part
exceeds the scope of authority delegated by the Legislature to the State Engineer and
offends principles of separation of powers. To the extent the district court held that
the application of the regulation must be limited to court adjudication decrees and
licenses issued by the State Engineer, we agree. 	However, we disagree with the
district court to the extent it held that application of the regulation may rest on subfile
orders or offers of judgment. We do not address 19.25.13.30 NMAC. We therefore
affirm in part and reverse in part.
2
BACKGROUND
{2} 	In 2003, the Legislature enacted NMSA 1978, Section 72-2-9.1(A)-(B) (2003),
which provides, in pertinent part:
A. 	The [L]egislature recognizes that the adjudication process
is slow, the need for water administration is urgent, compliance with
interstate compacts is imperative and the [S]tate [E]ngineer has authority
to administer water allocations in accordance with the water right
priorities recorded with or declared or otherwise available to the [S]tate
[E]ngineer.
B. 	The 	[S]tate 	[E]ngineer 	shall 	adopt 	rules 	for 	priority
administration to ensure that authority is exercised:
(1) 	so as not to interfere with a future or pending
adjudication;
(2) 	so as to create no impairment of water rights, other
than what is required to enforce priorities; and
(3) 	so as to create no increased depletions.
The State Engineer promulgated the AWRM regulations in response to the enactment
of Section 72-2-9.1. The Middle Rio Grande Conservancy District and Appellees Tri-
State Generation and Transmission Association, Inc. and New Mexico Mining
Association immediately challenged the new regulations. 	Following extensive
briefing and oral argument, the district court struck down portions of the AWRM
regulations. The district court concluded in pertinent part:
3
[T]his Court reverses the State Engineer’s Order No. 154, adopting the
Active Water Resource Management regulations in violation of his
statutory authority and the New Mexico and U.S. Constitutions, to the
following extent:
(1) 	19 NMAC 25.13.27’s list of the hierarchy of evidence for
administrable water rights violates N.M. Const. art. III, § 1, other
than A. a partial final decree or final decree; B. a subfile order in
an adjudication; C. an offer of judgment confirmed by the court in
a water rights adjudication; and E. a license issued by the State
Engineer.
The State Engineer appeals.
{3} 	The AWRM regulations are designed to enable the State Engineer to
administer water right priorities by curtailing “junior” water rights, or rights
established later in time, when water shortages threaten senior appropriators. 	See
19.25.13.6 NMAC (12/30/2004), 19.25.13.24 NMAC (12/30/2004), 19.25.13.27
NMAC. The regulations (1) direct the State Engineer to determine the elements of
water rights, including priority, in the course of administrative proceedings, and to set
an “administration date” delineating which water rights are “out-of-priority” and must
cease diversion; and (2) define enforcement mechanisms that enable water masters to
curtail the use of “out-of-priority” water rights. 	19.25.13.7(C)(3)(c) NMAC
(12/30/2004); 19.25.13.16 NMAC (12/30/2004); 19.25.13.17 NMAC (12/30/2004);
19.25.13.27 NMAC; 19.25.13.29 NMAC (12/30/2004). 	The regulations further
4
outline a procedure for publication of the list of water rights and associated priorities,
informal presentation of evidence by claimants to the State Engineer, formal hearings
on objections, and ultimately appeals. 19.25.13.27, 19.25.13.30 NMAC.
{4} 	Administrative Code 19.25.13.27 describes the process the State Engineer must
follow when determining priority.
The water master district manager for each water master district will
define each administrable water right by its elements as set forth in
Subsections A through G below. 	In all instances where the [S]tate
[E]ngineer makes determinations of priority based on best available
evidence as set forth in Subsections A through G below, he shall publish
a list of his determination of the water rights in the water master district
for review and provide opportunity to affected water right owners to
informally present evidence. The [S]tate [E]ngineer shall hear objections
to the water master district manager’s determination of an administrable
water right in accordance with [NMSA 1978, Section 72-2-16 (1973)].
Filing 	of 	an 	objection 	to 	the 	water 	master 	district 	manager’s
determination of an administrable water right will not stay the [S]tate
[E]ngineer’s administration based upon that determination, pending
resolution of the objection. 	Appeals from decisions of the [S]tate
[E]ngineer shall be in accordance with [NMSA 1978, Section 72-7-1
(1971)]. The water master district manager for each water master district
will define each administrable water right by its elements as set forth in:
A. 	a partial final decree or a final decree entered by an
adjudication court of competent jurisdiction, subject to any [S]tate
[E]ngineer permit issued subsequent to entry of said adjudication decree;
or, if no decree has been entered, then;
B. 	a 	subfile 	order 	entered 	by 	an 	adjudication 	court 	of
competent jurisdiction; or, if no subfile order has been entered, then;
5
C. 	an offer of judgment signed by the defendant in a water
rights adjudication; or, if no offer of judgment has been signed, then;
D. 	a hydrographic survey conducted and filed in accordance
with [NMSA 1978, Section 72-4-17 (1965) or NMSA 1978, Section 72-
4-16 (1919)]; or, if no hydrographic survey has been filed, then;
E. 	a license issued by the [S]tate [E]ngineer; or, if no license
has been issued, then[;]
F. 	a permit issued by the [S]tate [E]ngineer, accompanied by
proof of actual beneficial use; and
G. 	a determination made by the [S]tate [E]ngineer based on the
best available evidence, consisting of, where available, any filings with
the office of the [S]tate [E]ngineer, field or documentary evidence of
beneficial use associated with the right including historical aerial
photography, diversions records of historical diversions, historical
studies containing evidence regarding water use, and data regarding
irrigation and water delivery system requirements.
Id. 	Administrative Code 19.25.13.30 outlines the procedures by which objections
may be heard and appeals undertaken with respect to priority administration:
Owners 	of 	administrable 	water 	rights 	are 	encouraged 	to 	resolve
objections to the [S]tate [E]ngineer’s determination of an administration
date informally with the [S]tate [E]ngineer’s district office. 	If such
informal negotiations fail, the [S]tate [E]ngineer shall hear objections to
his determination of an administration date in accordance with Section
72-2-16. [] Filing of an objection to an administration date will not stay
the [S]tate [E]ngineer’s administration by administration date, pending
resolution of the objection. 	Appeals from decisions of the [S]tate
[E]ngineer shall be in accordance with Section 72-7-1[.]
STANDARD OF REVIEW
6
{5} 	The issues on appeal concern the extent of the authority that the Legislature
delegated to the State Engineer, as well as the constitutional validity of 19.25.13.27
NMAC in light of separation of powers concerns. 	Because these issues present
questions of law, we apply the standard of de novo review. See N.M. Indus. Energy
Consumers v. N.M. Pub. Regulation Comm’n, 2007-NMSC-053, ¶ 19, 142 N.M. 533,
168 P.3d 105 (“Statutory interpretation is an issue of law, which we review de
novo.”); N.M. Bd. of Veterinary Med. v. Riegger, 2007-NMSC-044, ¶ 27, 142 N.M.
248, 164 P.3d 947 (“We review questions of constitutional law and constitutional
rights . . . de novo.”).
SEPARATION OF POWERS
{6} 	In making their separation of powers arguments, the parties debate at length
whether the determination of the elements of water rights is fundamentally a judicial
function, such that the Legislature would be barred from any delegation to the State
Engineer in this realm. However, we do not consider this issue to be determinative.
The New Mexico Constitution contains nothing to indicate that determination of the
elements of water rights is consigned exclusively to the judicial branch; it merely
provides for de novo review. See N.M. Const. art. XVI, § 5 (providing for de novo
review in appeals from rulings of state executive officers or bodies in matters
7
pertaining to water rights). Nor do basic principles of separation of powers prohibit
administrative agencies from engaging in the processes of making factual and legal
determinations respecting the rights of individuals. See Wylie Corp. v. Mowrer, 104
N.M. 751, 752-53, 726 P.2d 1381, 1382-83 (1986) (upholding the creation of an
administrative agency to address individual rights and striking down prior authority
prohibiting 	administrative 	agencies 	from 	engaging 	in 	activities 	nominally
denominated “judicial” or “quasi-judicial” in nature); see also AA Oilfield Serv., Inc.
v. N.M. State Corp. Comm’n, 118 N.M. 273, 279, 881 P.2d 18, 24 (1994) (“This Court
has recognized that administrative agencies . . . may exercise ‘quasi-judicial’
powers.”). Rather, the separation of powers issue that concerns us is the nature and
reach of the legislative authority which the State Engineer argues permits him to adopt
the AWRM regulations at issue in this case.
Scope of Authority Delegated to the State Engineer by the Legislature
{7} 	As we have stated, we must determine whether the State Engineer acted within
the scope of authority granted by the Legislature. “Agencies are created by statute[s]
and limited to the power and authority expressly granted or necessarily implied by
those statutes.” 	Qwest Corp. v. N.M. Pub. Regulation Comm’n, 2006-NMSC-042,
¶ 20, 140 N.M. 440, 143 P.3d 478. If an agency acts beyond its legislative authority,
8
it infringes upon the Legislature’s role in violation of the separation of powers
principles of Article III, Section 1 of the New Mexico Constitution. 	State ex rel.
Sandel v. N.M. Pub. Util. Comm’n, 1999-NMSC-019, ¶¶ 11, 30, 127 N.M. 272, 980
P.2d 55 (holding that the Public Utility Commission’s deregulation of part of the
electric power industry was inconsistent with its statutory authority and thus intruded
on the province of the Legislature in violation of Article III, Section 1 of the New
Mexico Constitution). Accordingly, we look to the enabling statutes to determine the
scope of authority the Legislature granted the State Engineer.
{8} 	NMSA 1978, Section 72-2-1 (1982) is the principal enabling provision that
establishes the office of the State Engineer and specifies that the State Engineer “has
general supervision of waters of the state and of the measurement, appropriation,
distribution thereof and such other duties as required.” NMSA 1978, Section 72-2-9
(1907) further specifies that the State Engineer may supervise “the apportionment of
water in this state according to the licenses issued by him and his predecessors and the
adjudications of the courts.” 	NMSA 1978, Section 72-2-8 (1967) grants the State
Engineer the ability to adopt regulations implementing and enforcing laws in the
Water Code.
9
{9} 	Other statutory provisions grant the State Engineer the power to grant permits
and licenses. 	See NMSA 1978, §§ 72-5-1 (1941), 72-5-6 (1985), 72-5-13 (1907).
Generally, all prospective water users must apply to the State Engineer to appropriate
water, and the State Engineer is required to determine whether unappropriated water
is available. Sections 72-5-1, -6. But see NMSA 1978, § 72-12-1.1, -1.2, -1.3 (2003)
(creating exception for permits for domestic use wells, livestock wells and temporary
uses). 	The State Engineer must further evaluate applications to ensure that the
proposed use will not impair existing rights, is not contrary to conservation of water
within the state, and is not detrimental to the public welfare. Section 72-5-6; NMSA
1978, § 72-5-7 (1985). The State Engineer also has the authority to grant water right
applications subject to conditions to avoid detriment to existing rights or the public
welfare. Section 72-5-6.
{10} 	The statutes further grant the State Engineer authority over established water
rights. 	Claimants seeking to transfer the purpose or place of use of their water rights
are required to seek formal approval from the State Engineer, who must evaluate the
application to determine whether the change will impair existing rights. See NMSA
1978, §§ 72-5-23, -24; 72-12-7 (1985). The State Engineer may also initiate forfeiture
10
proceedings based upon an independent determination of nonuse. NMSA 1978, § 72-
5-28 (1997) (amended 2002).
{11} 	As demonstrated by these statutory provisions, the Water Code provides the
State Engineer with some authority to administer the appropriation and uses of water
within the state. 	To be sure, this statutory authority enables the State Engineer to
determine certain elements of water rights as part of this supervision. 	See, e.g.,
19.26.2.7(EE) NMAC (1/31/2005) (defining in the rules and regulations governing the
appropriation and use of surface waters “[w]ater right” as the “legal right to
appropriate water for a specific beneficial use” and stating that the “elements of a
water right generally include owner, point of diversion, place of use, purpose of use,
priority date, amount of water, periods of use, and any other element necessary to
describe the right”).
{12} 	Additionally, permits and licenses by necessity identify usage elements. See,
e.g., NMSA 1978, §§ 72-5-18 (1969) (amended 2007), 72-12-3(E) (2001); 72-5-1, -6,
-7, -13. They also incorporate a priority date. See NMSA 1978, § 72-5-3 (1941). The
licensing, permitting, transfer, and forfeiture statutes also, as we have stated, require
the State Engineer to evaluate factors such as beneficial use, availability of
unappropriated water, and impairment of existing rights.
11
{13} 	In order to evaluate beneficial use, the State Engineer must assess the quantity,
place of use, and purpose to which water has actually been applied. See State ex rel.
Martinez v. McDermett, 120 N.M. 327, 330, 901 P.2d 745, 748 (Ct. App. 1995)
(“Beneficial use has been defined as the use of such water as may be necessary for
some useful and beneficial purpose in connection with the land from which it is taken.
The concept requires actual use for some purpose that is socially accepted as
beneficial.” (internal quotation marks and citation omitted)). In order to evaluate the
availability of unappropriated water, the State Engineer must assess both the total
amount of water available within a stream system and all prior appropriations to
determine whether there is any residual amount. 	See Templeton v. Pecos Valley
Artesian Conservancy Dist., 65 N.M. 59, 69, 332 P.2d 465, 471 (1958) (observing
with respect to permit issuance that “the State Engineer has to consider all prior
appropriations to determine whether or not there are any unappropriated waters”). In
order to evaluate impairment of existing rights, the State Engineer must assess
whether 	the 	contemplated 	action 	will 	have 	an 	adverse 	effect 	on 	any 	prior
appropriation. 	See Montgomery v. Lomos Altos, Inc., 2007-NMSC-002, ¶ 31, 141
N.M. 21, 150 P.3d 971 (filed 2006) (“For the impairment analysis, the State Engineer
must either include the total amount of water rights . . . or formally extinguish them.”).
12
Evaluating 	available 	water, 	prior 	appropriations, 	and 	any 	adverse 	effect 	of
contemplated actions necessarily requires the State Engineer to consider the
relationship of the rights of individual water users.
{14} 	Finally, in the context of the State Engineer’s supervision of the uses of water,
the State Engineer may deny an application or impose conditions when granting it in
order to protect existing uses, including junior rights. See City of Roswell v. Berry,
80 N.M. 110, 112, 452 P.2d 179, 181 (1969); see also City of Albuquerque v.
Reynolds, 71 N.M. 428, 439, 379 P.2d 73, 81 (1962) (reiterating the State Engineer’s
“power and duty to . . . deny[] the applications in toto if necessary to protect existing
rights”). 	Under the doctrine recognized in 	Templeton 	that a senior surface
appropriator may access underground waters that were the source of the surface water
supply before being intercepted by junior users, our Supreme Court noted that the new
point of diversion could not impair the rights of these other users. 65 N.M. at 67-68,
332 P.2d at 470-71; see Herrington v. State ex rel. Office of State Eng’r, 2006-NMSC-
014, ¶ 11, 139 N.M. 368, 133 P.3d 258 (“Although the New Mexico prior
appropriation doctrine theoretically does not allow for sharing of water shortages, the
Templeton doctrine permits both the aggrieved senior surface appropriator and the
junior to divert their full share of water.” (footnote omitted)).
13
Legislative Authority to Promulgate the Regulations
{15} 	The 	State 	Engineer 	contends 	that 	this 	historical 	administration 	of 	the
appropriation and uses of water is consistent with the priority administration contained
in the AWRM regulations. He specifically argues that the Legislature has merely re-
directed his power in Section 72-2-9.1, such that although his exercise of the power
under the AWRM regulations may be different in application, it is not different in
kind. We agree only in a limited way.
{16} 	“The primary purpose of statutory construction is to discern and give effect to
the intent of the [L]egislature.” Medina v. Berg Constr., Inc., 1996-NMCA-087, ¶ 26,
122 N.M. 350, 924 P.2d 1362. 	“We do so by first looking to the statute’s plain
language and giving effect to the plain meaning of the words therein.” 	Cook v.
Anding, 2008-NMSC-035, ¶ 7, 144 N.M. 400, 188 P.3d 1151. We also examine “the
history of the statute and the object and purpose the Legislature sought to
accomplish.” Maes v. Audubon Indem. Ins. Group, 2007-NMSC-046, ¶ 11, 142 N.M.
235, 164 P.3d 934. We will not construe a statute in a manner that will render the
statute’s application absurd or unreasonable or will lead to injustice or contradiction.
Id.
14
{17} 	We begin our analysis of the legislative intent of Section 72-2-9.1 by looking
at the Legislature’s language. See Cook, 2008-NMSC-035, ¶ 7. Section 72-2-9.1(B)
requires the State Engineer to adopt rules for priority administration. The legislative
language does not specify the scope of such rules. In Section 72-2-9.1(A), the
Legislature recognizes the urgent need for water administration and specifically states
that the State Engineer “has authority to administer water allocations in accordance
with the water right priorities recorded with or declared or otherwise available to the
[S]tate [E]ngineer.” 	This statement purports to recite the authority of the State
Engineer; it does not grant additional authority. 	From the plain language of this
statement, we infer that the Legislature believed that the State Engineer already had
the necessary authority to adopt rules to administer water right priorities in accordance
with the Legislature’s intent in enacting Section 72-2-9.1 and that, as a result, the
Legislature did not need to expand upon the State Engineer’s authority in order to
accomplish its purpose.
{18} 	As established above, the Legislature has granted the State Engineer the
authority to determine the elements of water rights pertaining to appropriation and use
in connection with licenses, permits, transfers, and forfeiture. Further, Section 72-2-9
authorizes the State Engineer to supervise “the apportionment of water in this [S]tate
1Because it is not before us, we do not address or express any opinion as to
whether or how our opinion may affect domestic well rights.
15
according to the licenses issued by him and his predecessors and the adjudications of
the courts.” The AWRM regulations direct the State Engineer to determine priorities
of water rights for the purpose of curtailing certain rights in the event of a shortage
relying not only upon the adjudications of the courts and licenses issued by him, but
also upon other evidence available to him, such as subfile orders entered by an
adjudication court, offers of judgment, permits issued by the State Engineer, or
evidence resulting from a hydrographic survey. 19.25.13.27 NMAC. None of the
statutory provisions discussed above, nor any published decision addressing them,
suggests that the State Engineer has authority to engage in an inter se process or to
determine priorities for the purpose of curtailing rights from evidence other than
adjudication decrees or licenses.1
{19} 	Historically, the Water Code has provided for the determination of priorities
through a comprehensive system of adjudication in the courts and through licenses.
The adjudication process entails the “determination of all rights to the use” of waters
within a specified stream system, NMSA 1978, § 72-4-15 (1907), through the joinder
of all parties in a single action, Section 72-4-17, culminating in the filing of a decree
16
establishing the “priority, amount, purpose, periods and place of use” of the water
rights of each party, NMSA 1978, § 72-4-19 (1907). Licenses are issued in the final
stage of the water right permitting process, which involves an initial application to the
State Engineer, publication of the application, a protest period, evaluation by the State
Engineer, an administrative hearing, and an appeals process to the courts. See 72-5-1,
NMSA 1978, §§ 72-5-4 (1907) (amended 2001), -5 (1985), -6, -13, -31 (1909); §§ 72-
2-16, 72-7-1, 72-12-3.
{20} 	Although the Legislature expressed its frustration with the speed with which
adjudications proceed, and required the State Engineer to adopt rules, the Legislature
did not broaden the State Engineer’s authority regarding priority administration
beyond its existing scope, as described in Section 72-2-9. 	As a result, the State
Engineer’s authority to adopt regulations remains limited to the State Engineer’s
existing authority. 	Cf. Sandel, 1999-NMSC-019, ¶ 30 (holding that the New Mexico
Public Utility Commission’s deregulation of part of the electric power industry was
inconsistent with its existing authority and therefore improperly infringed upon the
Legislature’s authority).
{21} 	With 	regard 	to 	the 	State 	Engineer’s 	authority 	to 	engage 	in 	priority
administration, the parties have relied heavily on language in State ex rel. Reynolds
17
v. Pecos Valley Artesian Conservancy District (PVACD), 99 N.M. 699, 663 P.2d 358
(1983). In that case, our Supreme Court authorized the district court in the course of
a formal adjudication to modify the usual adjudication procedure to allow an inter se
process to proceed concurrently with the ongoing determination of individual water
rights. 	Id. at 700-01, 663 P.2d at 359-60. The purpose of the expedited procedure
was to enable priority administration, and the Court approved the procedure because
due process was properly afforded. 	Id. at 701, 663 P.2d at 360. 	The Court
nevertheless stressed that “there can be no administration of junior rights as against
senior rights until the parties have had an opportunity to contest priorities inter se.”
Id.; see State ex rel. Reynolds v. Sharp, 66 N.M. 192, 196-97, 344 P.2d 943, 945-46
(1959) (stating that although no decree declaring the elements of water rights can be
entered until after a “hearing to determine the relative rights of the parties, one toward
the other,” the court could bind an owner of water rights before the determination of
priorities if there is “substantial compliance with the requirements of the adjudication
statutes”). 	We acknowledge that our Supreme Court’s statements in PVACD
addressed the question of an expedited inter se process in the context of a formal
adjudication proceeding and were not directed to the specific issue that is before us
in this appeal. 99 N.M. at 700-01, 663 P.2d at 359-60. We read them, however, as
18
emphasizing the essential nature of a priority determination as among owners of water
rights before the curtailment of rights.
{22} 	The Legislature also granted the State Engineer the authority to administer
rights based upon licenses, and the licensing process likewise incorporates essential
elements of due process. See, e.g., § 72-5-13. Prior to issuance of a license, a permit
application is published and protests to the application are reviewed by the State
Engineer. Sections 72-5-4, -5, -6; 72-12-3. Although licenses are not commensurate
with adjudication decrees, and license rights are still subject to adjudication—see
NMSA 1978, §§ 72-4-13 (1982), -15—licenses and post inter se adjudication decrees
can be distinguished from the other forms of evidence enumerated in 19.25.13.27
NMAC. Both result from a process that incorporated procedures to allow parties to
object and to be afforded the opportunity for a full hearing prior to administration.
This process is consistent with the intent expressed in the original water code of 1907.
Although water masters were given the responsibility of apportioning water in the
state, that responsibility could only be exercised after water rights had been fully
determined. 	See 	1907 N.M. Laws, ch. 49, § 14 (current version at NMSA 1978,
Section 72-3-2 (1907) (amended 2007)) (“The water master shall have immediate
charge of the apportionment of waters in his district under the general supervision of
19
the territorial engineer, and he shall so appropriate, regulate and control the waters of
the district as will prevent waste.”); 1907 N.M. Laws, ch. 49, § 58 (“No water master
shall be appointed under this act, until the prior rights to the use of water have been
determined in one or more stream systems in this Territory under the provisions of this
act.”) (emphasis added) (repealed by 1941 N.M. Laws, ch. 126, § 28).
{23} 	In contrast, the other forms of evidence enumerated in the regulations, including
subfile 	orders 	and 	offers 	of 	judgment 	issued 	prior 	to 	inter 	se 	proceedings,
hydrographic surveys, and permits, have not been subject to general review and
objection by others. Although the regulations do provide for an objection and appeals
process, this process appears limited to the owner of the administrable water right, and
“[f]iling of an objection to an administration date will not stay the [S]tate [E]ngineer’s
administration by administration date.” 19.25.13.30 NMAC; see 19.25.13.27 NMAC
(“Filing of an objection to the water master district manager’s determination of an
administrable water right will not stay the [S]tate [E]ngineer’s administration based
upon that determination[.]”).
{24} 	The State Engineer argues that PVACD is not relevant to our analysis because
at the time PVACD was decided, the Legislature had not directed the State Engineer
to perform interim priority administration as it has done in Section 72-2-9.1. 	We
20
agree and note that this argument underscores the point that prior to the enactment of
Section 72-2-9.1, the State Engineer did not have the statutory authority to act in the
manner set forth in the AWRM regulations.
{25} 	The State Engineer additionally points to certain language contained in State
ex rel. Office of State Eng’r v. Lewis, 2007-NMCA-008, 141 N.M. 1, 150 P.3d 375
(filed 2006), as authority for the promulgation of the challenged regulations.
Specifically, in Lewis, this Court noted that “the water resource management
approach” is consistent with the adjudicatory authority of the courts. Id. ¶ 57. But the
type of administrative activity contemplated by the regulations at issue in this case is
entirely distinct from the court-approved negotiated settlement approach addressed in
Lewis. The State Engineer focuses on a statement in Lewis and argues that Section
72-2-9.1 is designed “for the State Engineer to address in certain specified ways the
urgent need for water administration outside of the adjudication process.” 	Lewis,
2007-NMCA-008, ¶ 58. 	However, this statement says nothing about the State
Engineer’s authority to determine priorities. 	And, as a whole, Lewis confirms the
courts’ broad authority to resolve water right disputes through the adjudicatory
process, rather than any pre-Section 72-2-9.1 authority on the part of the State
21
Engineer to determine priorities. 	We are unpersuaded that Lewis establishes any
precedent for the State Engineer’s position.
{26} 	We thus reach the conclusion that, based upon the statutory language and the
historical authority of the State Engineer, the Legislature did not intend Section 72-2-
9.1 to provide the State Engineer with the additional power of determining water right
priorities as among water rights owners and to curtail water usage based upon such
administrative determinations. 	See El Paso & R. I. Ry. Co. v. Dist. Court of Fifth
Judicial Dist., 36 N.M. 94, 101, 8 P.2d 1064, 1068 (1931) (“This [C]ourt has always
recognized that the jurisdiction of the [S]tate [E]ngineer to control and administer
appropriation and use is no broader than as expressed in or necessarily to be inferred
from the statute.”). By enacting Section 72-2-9.1, the Legislature indicated its desire
that priority administration not be left entirely to the State Engineer’s discretion under
Section 72-2-8, and it required the State Engineer to take action to address priority
administration. 	However, Section 72-2-9.1 did not expressly authorize the State
Engineer to make such determinations beyond adjudication decrees and licenses
necessary to carry out the AWRM regulations.
{27} 	Read in isolation, Section 72-2-1 might seem to include this authority.
However, when read in the context of the Water Code, and in particular with Section
22
72-2-9, it does not. Section 72-2-1 states the State Engineer’s general supervisory
authority; section 72-2-9 is specific as to the authority addressed by the Legislature
in Section 72-2-9.1 and restricts the State Engineer’s general supervisory authority to
apportion the waters of the state to licenses and court adjudications. If we were to
give effect to Section 72-2-1 at the expense of Section 72-2-9, we would not be
reading the two sections harmoniously and would render Section 72-2-9 meaningless.
See State v. Wilson, 2010-NMCA-018, ¶ 9, 147 N.M. 706, 228 P.3d 490 (filed 2009)
(“[S]tatute[s] must be read as a whole, construing each section so as to produce a
harmonious whole.”), cert. denied, 2010-NMCERT-001, 147 N.M. 673, 227 P.3d
1055; City of Deming v. Deming Firefighters Local 4521, 2007-NMCA-069, ¶ 23, 141
N.M. 686, 160 P.3d 595 (“We . . . do not give effect to legislative intent by reading
a statute in a way that would render it meaningless.”). As a result, we disagree with
the State Engineer’s argument that Section 72-2-1 has always given his office the
broad longstanding authority to apportion waters in this state beyond the limitation of
licenses and court adjudications identified in Section 72-2-9.
{28} 	Based upon the scope of the task involved, the existing adjudication statutes,
and case law limiting the State Engineer’s authority to administer priorities until after
adjudication, had the Legislature wished to grant the State Engineer such authority for
23
determining priorities, it would have done so in direct, clear, and certain terms, rather
than merely directing the State Engineer to adopt regulations consistent with the State
Engineer’s existing authority. See City of Roswell v. Smith, 2006-NMCA-040, ¶ 12,
139 N.M. 381, 133 P.3d 271 (stating that if the Legislature had wished to include
additional language in a statute, it could have done so); see also In re Petition of PNM
Gas Servs., 2000-NMSC-012, ¶ 73, 129 N.M. 1, 1 P.3d 383 (presuming that the
Legislature is aware of existing law, including agency rules); Sims v. Sims, 1996-
NMSC-078, ¶ 24, 122 N.M. 618, 930 P.2d 153 (presuming that the Legislature is well
informed about existing common law when they enacted a statute).
{29} 	This gap between the Legislature’s grant of authority to the State Engineer and
the State Engineer’s adoption of the AWRM regulations presents a separation of
powers problem under Article III, Section 1 of the New Mexico Constitution. 	An
administrative agency infringes upon the separate powers of the Legislature if it
exceeds its statutory authority and case law when adopting regulations. Sandel, 1999-
NMSC-019, ¶ 12. 	The district court specifically referenced this problem in
connection with “the hierarchy of evidence for determining priorities” in 19.25.13.27
NMAC. According to the district court, this AWRM regulation was flawed to the
extent that it allowed the State Engineer to consider forms of evidence beyond those
24
already allowed under existing statutes. Thus, the district court concluded that the
State Engineer had the statutory authority to consider decrees, subfile orders, and
offers of judgment of a water right adjudication court, as well as the State Engineer’s
issued licenses, as contemplated by 19.25.13.27(A), (B), (C), (E) NMAC.
{30} 	We clarify that the State Engineer has the statutory authority to consider
adjudication decrees and its own licenses, but not subfile orders or offers of judgment
filed in an adjudication. Nor does the State Engineer have the authority to consider
hydrographic surveys or permits as contemplated by 19.13.25.27(D) and (F) (NMAC).
Because the Legislature did not expand upon the State Engineer’s authority when
enacting Section 72-2-9.1, the State Engineer exceeded his authority by promulgating
19.25.13.27 NMAC, permitting him to determine priorities using other forms of
evidence for the purpose of curtailment of rights.
{31} 	We again emphasize that our holding does not mean that the Legislature does
not have the authority to grant the State Engineer the ability to promulgate regulations
such as those at issue. The Legislature created the existing system in which priority
administration as contemplated by the AWRM regulations follows the opportunity for
inter se contest. The Legislature may change the system. Because the Legislature did
not expand upon the State Engineer’s existing authority, the State Engineer infringed
25
upon 	the 	Legislature’s 	prerogative 	by 	making 	such 	a 	unilateral 	change 	by
administrative regulations.
{32} 	In the foregoing analysis, we have inferred from the Legislature’s language that
it intended the State Engineer to adopt rules for priority administration based on the
State Engineer’s existing authority to administer water allocations, and we have
concluded that paragraphs (B), (C), (D), and (F) of 19.25.13.27 NMAC exceed that
existing authority. We now consider whether the Legislature’s mistaken expression
of the State Engineer’s historic authority can overcome the effect of its specific
language.
{33} 	The issue centers on the legislative statement in Section 72-2-9.1(A) that “the
[S]tate [E]ngineer has authority to administer water allocations in accordance with the
water right priorities recorded with or declared or otherwise available to the [S]tate
[E]ngineer.” We note that this statement is not one of fact, but rather, is a conclusion
as to the state of the law regarding the State Engineer’s authority. 	See Ryan v.
Gonzales, 114 N.M. 346, 348, 838 P.2d 963, 965 (1992) (stating that the Supreme
Court will accord strong deference to legislative findings but must nevertheless rule
on issues of constitutionality). 	As we have discussed, this statement is the premise
26
for the State Engineer’s adoption of 19.25.13.27 NMAC. Yet, as we have concluded,
this language does not correctly express the existing law.
{34} 	As a consequence, we perceive a statutory flaw that undercuts the validity of
19.25.13.27 NMAC. 	If the Legislature intended that the State Engineer expedite
priority administration by adopting rules such as those set forth in 19.25.13.27 NMAC
because it believed that it had already conveyed such authority to the State Engineer,
or that the State Engineer otherwise had such authority under existing law, it acted on
a faulty premise. 	The Legislature’s mistaken recitation of such authority does not
grant the authority. See Whitney v. California, 274 U.S. 357, 374 (1927) (“[W]here
a statute is valid only in case certain conditions exist, the enactment of the statute
cannot alone establish the facts which are essential to its validity.” (Brandeis, J.,
concurring)), overruled on other grounds by Brandenburg v. Ohio, 395 U.S. 444, 449
(1969) (per curiam).
{35} 	Therefore, even if the Legislature had intended that the State Engineer adopt a
regulation such as 19.25.13.27 NMAC, the Legislature did not provide the statutory
framework for the State Engineer to do so, and the regulation unconstitutionally
exceeds the State Engineer’s authority. The authority of an administrative body to
enact regulations extends not only to the powers expressly provided by the
27
Legislature, but also to those that can be fairly implied from such powers, Redman v.
Bd. of Regents of N.M. Sch. for Visually Handicapped, 102 N.M. 234, 237, 693 P.2d
1266, 1269 (Ct. App. 1984). But in this case, the Legislature had not previously even
impliedly extended the authority reflected in 19.25.13.27 NMAC. We cannot stretch
this mistaken legislative assumption into the establishment of an implied grant of
power.
DUE PROCESS
{36} 	The district court held that portions of the AWRM regulations violate due
process protections, premised essentially on principles of procedural due process,
focusing on notice, the presentation of evidence, and judicial review. In light of our
holding that the Legislature has not granted the State Engineer the authority necessary
to administer priorities derived from evidence other than post-inter se adjudication
decrees and licenses, we consider it speculative to address issues of due process when
the regulations not only have not yet been applied but also, based on our holding, will
not be applied in their current form.
28
CONCLUSION
{37} 	For the foregoing reasons, we conclude that the State Engineer’s regulation
contemplating 	the 	determination 	and 	enforcement 	of 	priorities, 	specifically
19.25.13.27 (B), (C), (D), and (F) NMAC, exceeds the scope of authority delegated
by the Legislature and offends principles of separation of powers. 	We affirm the
district court’s limitation of 19.25.13.27 NMAC to court adjudication decrees and
licenses issued by the State Engineer. We reverse the district court’s conclusion that
subfile orders and offers of judgment filed in adjudication cases may be considered
in the application of 19.25.13.27 NMAC .
{38} 	IT IS SO ORDERED.
MICHAEL D. BUSTAMANTE, Judge
WE CONCUR:
___________________________________
CYNTHIA A. FRY, Chief Judge
___________________________________
TIMOTHY L. GARCIA, Judge