Federal Register final rules — 1995-12-19

issue-1995-12-19Federal Register final rules — 1995-12-19Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 95-30797 Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Best Available Controls for Consumer and Commercial Products (Including Architectural and Industrial Maintenance Coatings)
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65240-65243]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30797]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[MA44-1-7167a; A-1-FRL-5314-6]

Approval and Promulgation of Air Quality Implementation Plans; 
Massachusetts; Best Available Controls for Consumer and Commercial 
Products (Including Architectural and Industrial Maintenance Coatings)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is approving a State Implementation Plan (SIP) revision 
submitted by the Commonwealth of Massachusetts. This revision 
establishes and requires VOC emission standards for architectural and 
industrial maintenance coatings and 10 categories of consumer products. 
The intended effect of this action is to approve a revision to 
Massachusetts SIP which reduces VOC emissions from architectural and 
industrial maintenance coatings and 10 categories of consumer products. 
This action is being taken in accordance with Section 183(e) of the 
Clean Air Act.

DATES: This action is effective February 20, 1996, unless notice is 
received by January 18, 1996, that adverse or critical comments will be 
submitted. If the effective date is delayed, timely notice will be 
published in the Federal Register.

ADDRESSES: Comments may be mailed to Susan Studlien, Acting Director, 
Air, Pesticides and Toxics Management Division, U.S. Environmental 
Protection Agency, Region I, JFK Federal Building, Boston, MA 02203. 
Copies of the documents relevant to this action are available for 
public inspection during normal business hours, by appointment at the 
Air, Pesticides and Toxics Management Division, U.S. Environmental 
Protection Agency, Region I, One Congress Street, 10th floor, Boston, 
MA; Air and Radiation Docket and Information Center, U.S. Environmental 
Protection Agency, 401 M Street, S.W., (LE-131), Washington, D.C. 
20460; and the Division of Air Quality Control, Department of 
Environmental Protection, One Winter Street, 8th Floor, Boston, MA 
02108.

FOR FURTHER INFORMATION CONTACT: Jeanne Cosgrove, (617) 565-3246.

SUPPLEMENTARY INFORMATION: Under the Clean Air Act, EPA is required to 
(1) study emissions of VOCs from consumer and commercial products; (2) 
list those categories of products that account for at least 80 percent 
of the total VOC emissions from consumer and commercial products in 
areas of the country that fail to meet the national air quality 
standards set for ground-level ozone; and (3) divide the list into four 
groups, and regulate one group every two years using best available 
controls, as defined by the Clean Air Act.
    In March 1995, EPA issued a report to Congress, Study of Volatile 
Organic Compound Emissions from Consumer and Commercial Products, which 
evaluated the contribution of VOC emissions from consumer and 
commercial products on ground-level ozone levels, and established 
criteria and a schedule for regulating these products under the Clean 
Air Act. Architectural coatings and consumer and commercial products 
(24 categories of household products) are in the first 

[[Page 65241]]
group of products to be regulated by EPA no later than March 1997. 
Massachusetts decided to adopt rules for consumer and commercial 
products in advance of a federal rule, to get credit for reductions 
from this category in its 15% plan.
    Massachusetts was required to submit, by November 15, 1993, a SIP 
revision for Reasonable Further Progress (RFP) for 15% reduction of 
VOCs as necessary for moderate areas and above. The entire state of 
Massachusetts is classified as serious nonattainment area, therefore 
the 15% plan must cover the entire state.
    On May 6, 1994, the Massachusetts DEP submitted to EPA for comment, 
proposed amendments to the SIP to address the RFP requirements 
including new air pollution control regulations entitled ``Control of 
Volatile Organic Compounds from Consumer and Commercial Products'' and 
``Control of VOCs from Architectural and Industrial Maintenance 
Coating.'' Massachusetts held a public hearings on May 6, 10, 11, and 
13, 1994 throughout the State for its proposed architectural and 
industrial maintenance coatings rule. Public hearings were held June 22 
and 24 for Massachusetts' proposed consumer and commercial products 
rule. EPA submitted written comments regarding the proposed regulations 
on May 19, 1994 and June 22, 1994. Subsequent to the public hearings, 
Massachusetts decided to consolidate the architectural and industrial 
maintenance coatings rule and the consumer and commercial products rule 
into a single rule. The consolidated rule was effective on November 18, 
1994, upon publication in the Massachusetts Register.
    On January 9, 1995, the Commonwealth Massachusetts submitted a 
formal revision to its State Implementation Plan (SIP). The SIP 
revision amends 310 CMR 7.00 by adding Section 310 CMR 7.25, Best 
Available Controls for Consumer and Commercial Products .
    The adopted regulation 310 CMR 7.25, ``Best Available Controls for 
Consumer and Commercial Products,'' regulates the VOC content of 
consumer and commercial products. The regulation applies to any person 
who sells, offers for sale, or manufactures for sale within 
Massachusetts consumer and commercial products and architectural or 
industrial maintenance coatings specified in 310 CMR 7.25.

Summary of SIP Revision

    ``Consumer product'' is defined by Massachusetts as: ``A chemically 
formulated product used by household, commercial, and institutional 
consumers including, but not limited to, detergents; cleaning 
compounds; polishes; floor finishes; cosmetics; personal care products; 
home, lawn, and garden products; disinfectants; sanitizers; and 
automotive specialty products. This definition of ``consumer product'' 
excludes architectural coatings.''
    ``Architectural Coating'' is defined as: ``Any coating which is 
applied to stationary structures or their appurtenances, mobile homes, 
pavements, or curbs.''
    The consumer products portion of the rule, section 7.25(12), 
contains limits that specify the maximum allowed VOC content (%VOC by 
weight) for the following categories of commercial and consumer 
products: air fresheners, cleaners, engine degreasers, floor polishes/
waxes, furniture maintenance products, general purpose cleaners, glass 
cleaners, hair spray, insecticides, laundry prewash, antiperspirants 
and deodorants. Manufacturers must comply with these limits by October 
1, 1995.
    The Architectural and Industrial Maintenance portion of the rule, 
section 7.25(11), requires manufacturers to comply with VOC limits 
(grams VOC/liter or lbs VOC/gal) by October 1, 1995, for the following 
categories of Architectural coatings: flat coatings, non-flat coatings, 
anti-graffiti coating, bituminous pavement sealer, bond breakers, 
calcimine recoating product, concrete curing compound, concrete/masonry 
conditioner, dry fog coating, fire retardant coating, form release 
compound, graphic arts coating (sign paint), high temperature 
industrial maintenance coating, industrial maintenance coating, 
lacquer, magnesite cement coating, mastic texture coating, metallic 
pigmented coating, multicolor coating, pretreatment wash primer, 
primer/sealer/undercoat, quick dry primer/sealer/undercoat, roof 
coating, sanding sealer, shellac, stains, opaque, swimming pool 
coating, tile-like glaze, traffic coating, varnish, waterproofing 
sealer, wood preservative, and any other architectural coating not 
otherwise specified.
    EPA's evaluation is detailed in a memorandum, entitled ``Technical 
Support Document for Massachusetts Air Pollution Control Regulation , 
310 CMR 7.25, Best Available Controls for Consumer and Commercial 
Products (including Architectural and Industrial Maintenance 
Coatings).''
    EPA is publishing this action without prior proposal because the 
Agency views this as a noncontroversial amendment and anticipates no 
adverse comments. However, in a separate document in this Federal 
Register publication, EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed. This action will be 
effective February 20, 1996 unless adverse or critical comments are 
received by January 18, 1996.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by simultaneously publishing a subsequent 
notice that will withdraw the final action. All public comments 
received will then be addressed in a subsequent final rule based on 
this action serving as a proposed rule. The EPA will not institute a 
second comment period on this action. Any parties interested in 
commenting on this action should do so at this time. If no such 
comments are received, the public is advised that this action will be 
effective on February 20, 1996.

Final Action

    EPA is approving Section 310 CMR 7.25, Best Available Controls for 
Consumer and Commercial Products.
    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    Under Sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Madates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector, or to 
State, local, or tribal governments in the aggregate.
    Through submission of this state implementation plan or plan 
revision, the State and any affected local or tribal governments have 
elected to adopt the program provided for under Section 183(e) of the 
Clean Air Act. These rules may bind State, local and tribal governments 
to perform certain actions and also require the private sector to 
perform certain duties. To the extent that the rules being approved by 
this action will impose no new requirements; such sources are already 
subject to these regulations under State law. Accordingly, no 
additional costs to State, local, or tribal governments, or to the 
private sector, result from this action. EPA has also determined that 

[[Page 65242]]
this final action does not include a mandate that may result in 
estimated costs of $100 million or more to State, local, or tribal 
governments in the aggregate or to the private sector.
    This action has been classified as a Table 3 action by the Regional 
Administrator under the procedures published in the Federal Register on 
January 19, 1989 (54 FR 2214-2225), as revised by an October 4, 1993, 
memorandum from Michael H. Shapiro, Acting Assistant Administrator for 
Air and Radiation. A future notice will inform the general public of 
these tables.
    The OMB has exempted this action from review under Executive Order 
12866.
    SIP approvals under section 110 and subchapter I, Part D of the CAA 
do not create any new requirements, but simply approve requirements 
that the State is already imposing. Therefore, because the federal SIP-
approval does not impose any new requirements, I certify that it does 
not have a significant impact on any small entities affected. Moreover, 
due to the nature of the federal-state relationship under the CAA, 
preparation of a regulatory flexibility analysis would constitute 
federal inquiry into the economic reasonableness of state action. The 
CAA forbids EPA to base its actions concerning SIPs on such grounds. 
Union Electric Co. v. U.S. E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 
42 U.S.C. 7410 (a)(2).
    On January 6, 1989, the Office of Management and Budget (OMB) 
waived Table 2 and Table 3 revisions (54 FR 2222) from the requirements 
of Section 3 of Executive Order 12291 for a period of two years. EPA 
has submitted a request for a permanent waiver for Table 2 and Table 3 
SIP revisions. OMB has agreed to continue the temporary waiver until 
such time as it rules on EPA's request.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any State implementation plan. Each request for revision to 
the State implementation plan shall be considered separately in light 
of specific technical, economic, and environmental factors and in 
relation to relevant statutory and regulatory requirements.
    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by February 20, 1996. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review may be filed, and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Hydrocarbons, 
Incorporation by reference, Intergovernmental relations, Ozone, 
Reporting and recordkeeping requirements.

    Note: Incorporation by reference of the State Implementation 
Plan for the Commonwealth of Massachusett was approved by the 
Director of the Federal Register on July 1, 1982.

    Dated: September 21, 1995.
John P. DeVillars,
Regional Administrator, EPA New England.

    Part 52 of chapter I, title 40 of the Code of Federal Regulations 
is amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart W--Massachusetts

    2. Section 52.1120 is amended by adding paragraph (c)(108) to read 
as follows:

Sec. 52.1120  Identification of plan.

* * * * *
    (c) * * *
    (108) Revisions to the State Implementation Plan submitted by the 
Massachusetts Department of Environmental Protection on January 9, 
1995.
    (i) Incorporation by reference.
    (A) Letter from the Massachusetts Department of Environmental 
Protection dated January 9, 1995 submitting a revision to the 
Massachusetts State Implementation Plan.
    (B) The following portions of the Rules Governing the Control of 
Air Pollution for the Commonwealth of Massachusetts effective on 
November 18, 1994: 310 Code of Massachusetts Regulations Section 7.25 U 
Best Available Controls for Consumer and Commercial Products.
    3. In Sec. 52.1167, Table 52.1167 is amended by adding a new entry 
for 310 CMR 7.25 in numerical order to read as follows:

Sec. 52.1167  EPA-approved Massachussetts State regulations.

* * * * *

                                                   Table 52.1167.--EPA-Approved Rules and Regulations                                                   
                                                               [See Notes at end of table]                                                              
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                 Date                                                                                      Comments/    
     State citation         Title/subject     submitted       Date approved by EPA          Federal Register citation      52.1120(c)      unapproved   
                                               by State                                                                                     sections    
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                   *                  *                  *                  *                  *                  *                  *                  
310 CMR 7.25...........  Best available         11/18/94  December 19, 1995...........  60 FR 65242.....................          108  Includes         
                          controls for                                                                                                  architectural & 
                          consumer and                                                                                                  industrial      
                          commercial                                                                                                    maintenance     
                          products.                                                                                                     coatings.       
                                                                                                                                                        
                   *                  *                  *                  *                  *                  *                  *                  
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 65243]]

[FR Doc. 95-30797 Filed 12-18-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-30790 Asbestos NESHAP Clarification Regarding Analysis of Multi-Layered Systems
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65243-65244]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30790]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 61

[FRL-5399-3]

Asbestos NESHAP Clarification Regarding Analysis of Multi-Layered 
Systems

AGENCY: Environmental Protection Agency.

ACTION: Notice of clarification to the final rule.

-----------------------------------------------------------------------

SUMMARY: This document provides clarification regarding the 
requirements of the National Emission Standards for Hazardous Air 
Pollutants (NESHAP) for asbestos. It is intended to address common 
questions regarding situations where one or more layers which may 
contain asbestos are present, and supplement the January 5, 1994 
Federal Register clarification (59 FR 542).

EFFECTIVE DATE: December 19, 1995.

FOR FURTHER INFORMATION CONTACT: For copies, contact Mr. Larry Tessier 
at 1-800-368-5888 or at (703) 305-5938. For questions about the 
clarification, please contact Mr. Tom Ripp at (202) 564-7003.

SUPPLEMENTARY INFORMATION: On November 20, 1990, the Federal Register 
published the Environmental Protection Agency's (the Agency's) revision 
of the National Emission Standards for Hazardous Air Pollutants for 
Asbestos (asbestos NESHAP), 40 CFR part 61, subpart M, 55 FR 48406. The 
asbestos NESHAP applies to any facility as defined in 40 CFR 61.141. 
The Agency has learned that some of the regulated community have 
further questions concerning the analysis of samples which may contain 
multiple layers, any or all of which may be asbestos containing 
materials (ACM) under the asbestos NESHAP. Because these questions are 
frequently asked, EPA is making this clarification.

I. Clarification of Multi-Layered ACM System

    At the time the original asbestos NESHAP was promulgated (April 6, 
1973), a standardized reference method had not been developed to 
determine quantitatively the content of asbestos in a material. The 
definition for ``friable asbestos material'' was added in the October 
14, 1975 asbestos NESHAP, but still did not specify an analytical 
method. EPA's unwritten policy based on the definition of ``friable 
asbestos material'' was that each layer in a multi-layered system was 
to be analyzed as a separate material (no averaging or dilution by 
combining layers of asbestos-containing material with nonasbestos-
containing material was allowed). The November 20, 1990 revision of the 
asbestos NESHAP finally specified that Appendix A, Subpart F, 40 CFR 
Part 763, Section 1, Polarized Light Microscopy (PLM method) be used to 
determine whether or not a material contains greater that one percent 
asbestos. Section 1.7.2.1 of the PLM method states that ``* * * When 
discrete strata are identified, each is treated as a separate material 
so that fibers are first quantified in that layer only, and then the 
results for each layer are combined to yield an estimate of asbestos 
content for the whole sample.'' This language has led to considerable 
confusion as to how to analyze multi-layered samples for NESHAP 
purposes. EPA published a clarification regarding the analysis of 
multi-layered systems in the January 5, 1994 Federal Register. This 
clarification basically stated that all multi-layered systems except 
for wall systems where joint compound was used only at the joints and 
nail holes must be analyzed as separate materials, and results were not 
allowed to be combined to determine average asbestos content 
(continuing the policy that dilution of an asbestos-containing material 
is not allowed).
    The Environmental Protection Agency has received many questions 
about analyzing multi-layered systems for asbestos content to determine 
the applicability of the asbestos NESHAP since its January 5, 1994 
clarification (59 FR 542). This clarification reiterates EPA's position 
for analysis of multi-layered samples for applicability of the asbestos 
NESHAP.
    This clarification applies to all multi-layered systems (other than 
wallboard systems where asbestos-containing joint compound is used only 
at the joints and nail holes) under both the NESHAP and the Asbestos 
Hazard Emergency Response Act (AHERA) (40 CFR Part 763) programs.
    Any source sending multi-layered bulk samples to a lab may request 
that certain sample(s) or portions of sample(s) be composited for 
analysis first (to potentially reduce time and cost of sampling).

    (Note: A composite sample does not mean that multiple samples 
may be composited into one sample. It means that multiple layers of 
one core sample may be composited for analysis.)

    If this alternative method is chosen, then the following 
requirements must be followed. To analyze the composite sample, the 
procedures in EPA/600-93/116 ``Method for the Determination of Asbestos 
in Bulk Building Materials'' (``the Method''), specifically Section 2.3 
``Gravimetry,'' must be used. Additionally, for the composite sample, 
the recommendations in Appendix D of the method must be followed. This 
procedure is consistent with the procedures outlined in 40 CFR Part 
763, Appendix E to Subpart E (formerly Appendix A to Subpart F), which 
is referenced in the asbestos NESHAP (40 CFR 61.141 and 61.146), but 
the procedures in the new method are more clear. EPA finds that this 
method is an acceptable alternative method of compliance under section 
61.13(h)(1)(ii). EPA intends to amend the asbestos NESHAP in the near 
future to refer specifically to these procedures. When using the 
gravimetric procedures, the result may be recorded as percent asbestos 
by weight.
    If the result of the composite analysis shows that the average 
content for the multi-layered system (across the layers) is greater 
than one percent, then the multi-layered system must be treated as 
asbestos-containing and analysis by layers is not necessary. If the 
result of the composite sample analysis indicates that the multi-
layered system as a whole contains asbestos in the amount of one 
percent or less, but greater than none detected, then analysis by 
layers is required to ensure that no layer in the system contains 
greater than one percent asbestos. If any layer contains greater than 
one percent asbestos, that layer must be treated as asbestos-
containing. This will have the effect of requiring all layers in a 
multi-layered system to be treated as asbestos-containing if the layers 
can not be separated without disturbing the asbestos-containing layer. 
Once any one layer is shown to have greater than one percent asbestos, 
further analysis of the other layers is not necessary if all the layers 
will be treated as asbestos-containing. If several of the layers will 
be removed without removing the entire system, then all layers that 
will be disturbed must be analyzed. This includes the material being 
removed; however, the material being removed may be analyzed using the 
composite analysis procedures. Please note that the same requirements 
to perform point counting as stated in our May 8, 1991 clarification 
(see enclosed memorandum) still apply for any layers being analyzed 
individually.

[[Page 65244]]

    Dated: September 28, 1995.
Richard Biondi,
Acting Director, Manufacturing, Energy, and Transportation Division, 
Office of Compliance.
[FR Doc. 95-30790 Filed 12-18-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-30757 Radio Broadcasting Services; Wickenburg and Lake Havasu City, AZ
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Page 65244]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30757]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 73

[MM Docket No. 90-468; RM-7380]

Radio Broadcasting Services; Wickenburg and Lake Havasu City, AZ

AGENCY: Federal Communications Commission.

ACTION: Final rule; petition for reconsideration.

-----------------------------------------------------------------------

SUMMARY: This documents grants a Petition for Reconsideration filed by 
Interstate Broadcasting System of Arizona, Inc., licensee of Station 
KRDS-FM, Channel 287C2, Wickenburg, Arizona, directed to the Report and 
Order in this proceeding which had upgraded the Station KRDS-FM license 
to specify operation on Channel 287C1. See 56 FR 43884, September 5, 
1991. With this action, the proceeding is terminated.

EFFECTIVE DATE: January 26, 1996.

FOR FURTHER INFORMATION CONTACT: Robert Hayne, Mass Media Bureau, (202) 
776-1654.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Commission's 
Memorandum Opinion and Order in MM Docket No. 90- 468, adopted December 
6, 1995, and released December 12, 1995. The full text of this decision 
is available for inspection and copying during normal business hours in 
the FCC Reference Center (Room 239), 1919 M Street, NW., Washington, 
DC. The complete text of this decision may also be purchased from the 
Commission's copy contractor, International Transcription Service, 
Inc., (202) 857-3800, 1919 M Street, NW., Room 246, or 2100 M Street, 
NW., Suite 140, Washington, DC 20037.

List of Subjects in 47 CFR Part 73

    Radio broadcasting.

    Part 73 of title 47 of the Code of Federal Regulations is amended 
as follows:

PART 73--[AMENDED]

    1. The authority citation for part 73 continues to read as follows:

    Authority: Secs. 303, 48 Stat., as amended, 1082; 47 U.S.C. 154, 
as amended.

Sec. 73.202  [Amended]

    2. Section 202(b), the Table of FM Allotments under Arizona, is 
amended by removing Channel 287C1 and adding Channel 287C2 at 
Wickenburg.

Federal Communications Commission.
Douglas W. Webbink,
Chief, Policy and Rules Division, Mass Media Bureau.
[FR Doc. 95-30757 Filed 12-18-95; 8:45 am]
BILLING CODE 6712-01-F

Complete official Federal Register PDF

FR Doc. 95-30683 Withholding on Distributions of Indian Gaming Profits to Tribal Members
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65237-65238]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30683]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Internal Revenue Service

26 CFR Part 31

[TD 8634]
RIN 1545-AT12

Withholding on Distributions of Indian Gaming Profits to Tribal 
Members

AGENCY: Internal Revenue Service (IRS), Treasury.

ACTION: Final regulations.

-----------------------------------------------------------------------

SUMMARY: This document contains final regulations relating to the 
income tax withholding requirement on distributions of profits from 
certain gaming activities made to members of Indian tribes under 
section 3402(r) of the Internal Revenue Code of 1986. Those affected by 
the regulations are persons, including Indian tribes, making payments 
to members of Indian tribes from net revenues of certain gaming 
activities conducted or licensed by the tribes. Also affected are 
members of Indian tribes who receive the payments.

DATES: These regulations are effective December 19, 1995.
    For date of applicability, see Sec. 31.3402(r)-1(b).

FOR FURTHER INFORMATION CONTACT: Rebecca Wilson (202) 622-6040 (not a 
toll-free number).

SUPPLEMENTARY INFORMATION:

Background

    This document contains amendments to the Employment Tax Regulations 
(26 CFR part 31) under section 3402(r). Section 3402(r) was added by 
section 701 of the Uruguay Round Agreements Act, which approved the 
trade agreements resulting from the Uruguay Round of multilateral trade 
negotiations under the auspices of the General Agreement on Tariffs and 
Trade (GATT) and the Statement of Administrative Action to implement 
the Agreements.
    On December 22, 1994, temporary regulations (TD 8574) relating to 
withholding on distributions of Indian gaming profits to tribal members 
under section 3402(r) were published in the Federal Register (59 FR 
65939). A notice of proposed rulemaking (EE-60-94) cross-referencing 
the temporary regulations was published in the Federal Register for the 
same day (59 FR 65982). No public hearing was requested or held.
    Also on December 22, 1994, the IRS mailed a copy of Notice 1026, 
providing withholding tables for use in 1995, to Indian tribes and 
gaming establishments listed with the National Indian Gaming 
Commission. For 1996 and subsequent years, tables will be printed in a 
supplement to Circular E.
    The IRS received written comments responding to the notice of 
proposed rulemaking. After consideration of the comments, the 
regulations proposed by EE-60-94 are adopted as revised by this 
Treasury decision, and the corresponding temporary regulations are 
withdrawn. The regulations contain no substantive changes.

Explanation of Provisions

    1. Indian Gaming Regulatory Act. Net revenue from certain gaming 
activities conducted or licensed by an Indian tribe may be used to make 
taxable distributions to members of the Indian tribe. The tribe must 
notify its members of the tax liability at the time the payments are 
made. 25 U.S.C. 2710 (b)(3) and (d)(1).

    2. Prior law. Prior to the addition of section 3402(r) in 1994, a 
tribe was not required to withhold on these distributions to tribal 
members except to the extent backup withholding rules applied under 
section 3406.

    3. Code section 3402(r). Section 3402(r) generally requires that, 
for payments made after December 31, 1994, persons, including Indian 
tribes, making payments to members of Indian tribes from the net 
revenues of certain gaming activities conducted or licensed by the 
tribes deduct and withhold income taxes from those payments. Section 
3402(r) provides that the withholding amount be calculated assuming 
that the taxpayer is single and has one exemption.

    4. Legislative history. The legislative history of section 3402(r) 
indicates that the goal of the new withholding requirement was to make 
it easier for tribal members who receive gaming distributions to meet 
their tax responsibilities:

    Distributions of net revenues from gaming activity by an Indian 
tribe may result in significant tax liability to the tribe's 
members. Establishing withholding on such payments will more closely 
match estimated tax payments to ultimate tax liability. For some 
tribal members, this change may eliminate the need to make quarterly 

[[Page 65238]]
estimated tax payments. For others, it will reduce the likelihood that 
they will face penalties for underpayment of tax at the time of tax 
filing.

H.R. Rep. No. 826, 103d Cong., 2d Sess., pt.1, at 170-171 (1994).
    5. Proposed regulations. The proposed regulations implement the 
withholding method prescribed by section 3402(r). They also permit 
additional withholding by agreement between the tribal member and the 
tribe.
    6. Comments and final regulations. The IRS received only two 
written comments on the proposed regulations. After consideration of 
both comments, the proposed regulations are adopted with no substantive 
changes.
    No comments were received from the Chief Counsel for Advocacy of 
the Small Business Administration.

Special Analyses

    It has been determined that this Treasury decision is not a 
significant regulatory action as defined in EO 12866. Therefore, a 
regulatory assessment is not required. It also has been determined that 
section 553(b) of the Administrative Procedure Act (5 U.S.C. chapter 5) 
and the Regulatory Flexibility Act (5 U.S.C. chapter 6) do not apply to 
these regulations, and, therefore, a Regulatory Flexibility Analysis is 
not required. Pursuant to section 7805(f) of the Internal Revenue Code, 
the notice of proposed rulemaking preceding these regulations was 
submitted to the Small Business Administration for comment on its 
impact on small business.

    Drafting Information. The principal author of the regulations is 
Rebecca Wilson, Office of the Associate Chief Counsel (Employee 
Benefits and Exempt Organizations), IRS. However, other personnel 
from the IRS and Treasury Department participated in their 
development.

List of Subjects in 26 CFR Part 31

    Employment taxes, Income taxes, Penalties, Pensions, Railroad 
retirement, Reporting and recordkeeping requirements, Social security, 
Unemployment compensation.

Adoption of Amendments to the Regulations

    Accordingly, 26 CFR part 31 is amended as follows:

PART 31--EMPLOYMENT TAXES AND COLLECTION OF INCOME TAX AT SOURCE

    Paragraph 1. The authority citation for part 31 is amended by 
removing the entry for section 31.3402(r)-1T and adding an entry in 
numerical order to read as follows:

    Authority: 26 U.S.C. 7805 * * *
    Section 31.3402(r)-1 also issued under 26 U.S.C. 3402(p) and 
(r), * * *

    Par. 2. Section 31.3402(r)-1 is added to read as follows:

Sec. 31.3402(r)-1   Withholding on distributions of Indian gaming 
profits to tribal members.

    (a) (1) General rule. Section 3402(r)(1) requires every person, 
including an Indian tribe, making a payment to a member of an Indian 
tribe from the net revenues of any class II or class III gaming 
activity, as defined in 25 U.S.C. 2703, conducted or licensed by such 
tribe to deduct and withhold from such payment a tax in an amount equal 
to such payment's proportionate share of the annualized tax, as that 
term is defined in section 3402(r)(3).
    (2) Withholding tables. Except as provided in paragraph (a)(4) of 
this section, the amount of a payment's proportionate share of the 
annualized tax shall be determined under the applicable table provided 
by the Commissioner.
    (3) Annualized amount of payment. Section 3402(r)(5) provides that 
payments shall be placed on an annualized basis under regulations 
prescribed by the Secretary. A payment may be placed on an annualized 
basis by multiplying the amount of the payment by the total number of 
payments to be made in a calendar year. For example, a monthly payment 
may be annualized by multiplying the amount of the payment by 12. 
Similarly, a quarterly payment may be annualized by multiplying the 
amount of the payment by 4.
    (4) Alternate withholding procedures--(i) In general. Any procedure 
for determining the amount to be deducted and withheld under section 
3402(r) may be used, provided that the amount of tax deducted and 
withheld is substantially the same as it would be using the tables 
provided by the Commissioner under paragraph (a)(2) of this section. At 
the election of an Indian tribe, the amount to be deducted and withheld 
under section 3402(r) shall be determined in accordance with this 
alternate procedure.
    (ii) Method of election. It is sufficient for purposes of making an 
election under this paragraph (a)(4) that an Indian tribe evidence the 
election in any reasonable way, including use of a particular method. 
Thus, no written election is required.
    (5) Additional withholding permitted. Consistent with the 
provisions of section 3402(p), a tribal member and a tribe may enter 
into an agreement to provide for the deduction and withholding of 
additional amounts from payments in order to satisfy the anticipated 
tax liability of the tribal member. The agreement may be made in a 
manner similar to that described in Sec. 31.3402(p)-1 (with respect to 
voluntary withholding agreements between employees and employers).
    (b) Effective date. This section applies to payments made after 
December 31, 1994.

Sec. 31.3402(r)-1T  [Removed]

    Par. 3. Section 31.3402(r)-1T is removed.
Margaret Milner Richardson,
Commissioner of Internal Revenue.

    Approved: November 28, 1995.
Leslie Samuels,
Assistant Secretary of the Treasury.
[FR Doc. 95-30683 Filed 12-18-95; 8:45 am]
BILLING CODE 4830-01-U

Complete official Federal Register PDF

FR Doc. 95-30677 National Driver Register and Criminal Record Review in Issuing Licenses, Certificates of Registry, or Merchant Mariner's Documents
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65478-65490]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30677]

[[Page 65477]]

_______________________________________________________________________

Part V

Department of Transportation

_______________________________________________________________________

Coast Guard

_______________________________________________________________________

46 CFR Parts 10 and 12

National Driver Registration and Criminal Record Review in Issuing 
Licenses, Certificates of Registry, or Merchant Mariner's Documents; 
Final Rule

Federal Register / Vol. 60, No. 243 / Tuesday, December 19, 1995 / 
Rules and Regulations

[[Page 65478]]

DEPARTMENT OF TRANSPORTATION

Coast Guard

46 CFR Parts 10 and 12

[CGD 91-212]
RIN 2115-AD93

National Driver Register and Criminal Record Review in Issuing 
Licenses, Certificates of Registry, or Merchant Mariner's Documents

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In furtherance of the President's Regulatory Reinvention 
Initiative, this rulemaking establishes Coast Guard regulations which 
implement the provisions of the Oil Pollution Act of 1990 (OPA 90) that 
permit the Coast Guard to review information from the National Driver 
Register on an applicant prior to issuing or renewing a license, 
certificate of registry (COR), or merchant mariner's document (MMD). 
This rulemaking also addresses OPA 90 provisions that permit the Coast 
Guard to review the criminal records of applicants prior to issuing a 
license, COR or MMD. In addition, it establishes regulations that 
permit criminal record checks of any individual applying for a raise in 
grade of a license or COR; a renewal of a license, COR, or MMD; or an 
endorsement of an MMD with a new expiration date. This rulemaking 
provides the Coast Guard an opportunity to identify an applicant who 
has been convicted of certain motor vehicle offenses or convicted of 
certain serious crimes.

EFFECTIVE DATE: January 18, 1996.

ADDRESSES: Unless otherwise indicated, documents referred to in this 
preamble are available for inspection or copying at the office of the 
Executive Secretary, Marine Safety Council (G-LRA/3406) (CGD 91-212), 
U.S. Coast Guard Headquarters, 2100 Second Street SW., room 3406, 
Washington, DC 20593-0001 between 8 a.m. and 3 p.m., Monday through 
Friday, except Federal holidays. The telephone number is (202) 267-
1477.

FOR FURTHER INFORMATION CONTACT:
Mr. Stewart Walker, Marine Personnel Qualifications (G-MCO-1), (202) 
267-0475. This telephone records messages on a 24-hour basis.

SUPPLEMENTARY INFORMATION: 

    Drafting Information. The principal persons involved in drafting 
this document are Mr. James W. Cratty, Project Manager, Project 
Development Branch (G-MES-2) and Ms. Jacqueline Sullivan, Project 
Counsel, Office of the Chief Counsel (G-LRA).

Regulatory History

    On March 13, 1995, the Coast Guard published a notice of proposed 
rulemaking (NPRM) entitled ``National Driver Register and Criminal 
Record Review in Issuing Licenses, Certificates of Registry, or 
Merchant Mariner's Documents'' in the Federal Register (60 FR 13570). 
The Coast Guard received 29 letters commenting on the proposal. Several 
comments requested a public hearing. The Coast Guard determined that a 
public hearing is unnecessary and that all of the issues contained in 
the comments are addressed in this rulemaking.

Background and Purpose

1. General

    Under the authority of 46 U.S.C. 7101, the Coast Guard issues 
licenses to qualified officers such as masters, mates, pilots, 
engineers, operators, and radio officers. It also issues certificates 
of registry (CORs) to qualified staff officers such as pursers, medical 
doctors, and professional nurses.
    The Coast Guard issues merchant mariner's documents (MMDs), with 
certain exceptions described in 46 U.S.C. 8701, to vessel personnel for 
service aboard U.S. flag merchant vessels of more than 100 gross tons 
which operate on waters other than rivers and lakes. The MMD serves as 
a certificate of identification and qualification, authorizing work in 
different capacities on deck and in the engine and steward's 
departments. The MMD, with an appropriate endorsement, is also the 
credential issued to qualified tankermen. Many merchant mariners who 
hold licenses and CORs also hold MMDs.
    All licensing and documentation transactions are processed at Coast 
Guard Regional Examination Centers (RECs) exercising the authority of 
the Officer in Charge, Marine Inspection (OCMIs).
    Sections 4101(a) and (b) and section 4102(e) of the Oil Pollution 
Act of 1990 (OPA 90) (Pub. L. 101-380) amend 46 U.S.C. 7101, 7302, and 
7109, respectively, to authorize the Coast Guard to conduct criminal 
record checks of any individual applying for a license, COR, or MMD; 
for a raise in grade of a license or COR; for a renewal of a license, 
COR, or MMD; or for an endorsement of an MMD with a new expiration 
date. Some individuals with criminal records may be unsuitable 
candidates for a license, COR, or MMD because they present a risk to 
passengers, fellow crew members, or the safe operation of a vessel.
    As amended, 46 U.S.C. 7101 and 7302 prohibit the Coast Guard from 
issuing a license, COR, or MMD to an applicant unless the applicant 
makes available to the Coast Guard any information contained in the 
National Driver Register (NDR) related to an offense committed by the 
applicant that is described in sections 205(a)(3)(A) or (B) of the 
National Driver Register Act of 1982 (49 U.S.C. Chapter 303). These 
offenses are: operation of a motor vehicle under the influence of, or 
while impaired by, alcohol or a controlled substance; and any traffic 
violation(s) arising in connection with a fatal traffic accident, 
reckless driving, or racing on the highways.
    Although an individual's motor vehicle record may not be directly 
related to his or her maritime career, a record of alcohol or drug-
related motor vehicle offenses, or other motor vehicle offenses as 
specified in sections 205(a)(3)(A) and (B) of the NDR Act of 1982, 
indicates that the individual may have a disregard for his or her own 
safety or the safety of others and therefore may not be suitable for 
maritime employment.
    Section 4105(b) of OPA 90 amended 46 U.S.C. Chapter 75, to require 
the Coast Guard to make the information received from the NDR available 
to the applicant for review and written comment before the Coast Guard 
uses this information as a basis for denying, suspending, revoking, or 
taking other action on that individual's license, COR, or MMD.
    Before Congress enacted OPA 90, an individual who applied for a 
license, COR, or MMD was not required to provide the Coast Guard with 
NDR information. However, an applicant for a license or COR was asked 
on the application form if he or she had been convicted of any 
offense(s) other than minor traffic violation(s). Information provided 
by the applicant regarding conviction(s) for other than minor traffic 
violation(s), including Driving Under the Influence (DUI) or Driving 
While Intoxicated (DWI), was used to evaluate the applicant's 
qualifications to hold a license or COR.

2. Criminal Record Review Under Current Regulations

    a. Licenses and CORs. The current regulations at 46 CFR 10.205, 
``Requirements for original licenses and certificates of registry,'' 
require the applicant to have his or her fingerprints taken during the 
application process. The Coast Guard uses the fingerprints to determine 
if a criminal record exists for 

[[Page 65479]]
the individual. Section 10.205(f)(2) authorizes the OCMI to reject an 
application if the criminal record check, or other information, 
indicates that an applicant's habits of life and character are such 
that the applicant cannot be entrusted with the duties and 
responsibilities associated with a license or COR. The OCMI notifes the 
applicant of the reason(s) for disapproval.
    Section 10.205(f)(4) indicates that, in the event a license or COR 
has been issued before adverse information on the applicant's character 
or habits of life, or information indicating that the application is 
false or incomplete, is obtained the OCMI may notify the individual 
that the license or COR is null and void and direct the holder to 
return the license or certificate to the OCMI.
    Under 46 CFR 10.209, ``Requirements for renewal of a license,'' 
each renewal applicant must use a standard form furnished by the Coast 
Guard. The form asks the applicant to identify any criminal convictions 
or history of drug use. Under Sec. 10.209(b), an applicant may not have 
his or her license renewed if facts which would render a renewal 
improper have come to the Coast Guard's attention.
    The Coast Guard currently performs a license renewal criminal 
record check when an individual has identified a conviction or drug use 
on the application. In addition, the Coast Guard performs a criminal 
record check on applicants for renewal whom it suspects have criminal 
records or a history of drug use. The Conference Report on OPA 90 (H.R. 
Conf. Rep. No. 101-653) recognizes these existing Coast Guard 
procedures.
    Related regulations in 46 CFR part 10, ``Requirements for raise of 
grade of a license'' (Sec. 10.207) and ``Issuance of duplicate of 
license or certificate of registry'' (Sec. 10.219), currently do not 
address criminal record checks.
    b. Merchant Mariner's Documents. The regulations contained at 46 
CFR part 12, ``Certification of Seamen,'' do not address fingerprinting 
an applicant for an MMD specifically for a criminal record check; 
however, under existing practice, the Coast Guard fingerprints an 
individual applying for his or her original MMD and performs a criminal 
record check on the applicant. The Coast Guard does not fingerprint and 
check the criminal record of a person obtaining a duplicate MMD or an 
additional MMD endorsement.
    Under law existing prior to OPA 90, the Coast Guard was not 
required to consider the character and habits of life of an applicant 
for an MMD as it was for licenses and CORs. The only specific statutory 
provision concerning dangerous drug use or criminal convictions 
authorized the Coast Guard to deny an MMD to an applicant convicted for 
a dangerous drug offense within 10 years prior to the date of 
application (46 U.S.C. 7503). The Coast Guard has also been authorized 
to deny an MMD to a person who has ever used or has ever been addicted 
to a dangerous drug unless the applicant provides satisfactory proof 
that he or she is suitable for employment in the merchant marine.

3. National Driver Register Access

    The National Highway Traffic Safety Administration (NHTSA) of the 
Department of Transportation (DOT) maintains the NDR, which is a 
nationwide repository of information on drivers. The NDR is part of a 
voluntary cooperative program that assists State motor vehicle driver 
licensing agencies and certain Federal agencies in gaining access to 
data on an individual's motor vehicle driving record. The NDR Act of 
1982 prohibits the use of information in the NDR that is more than 3 
years old, unless that information relates to a current suspension or 
revocation of the individual's license to operate a motor vehicle.
    At present, access to the NDR must be made through participating 
States. DOT has proposed legislation to amend section 307 of the NDR 
Act of 1982 to allow direct NDR access by Federal agencies. If the 
proposed legislation is enacted, the Coast Guard intends to adopt the 
direct access methodology.

Discussion of Comments and Changes

    Twenty-nine letters were received in response to the NPRM. The 
Coast Guard has considered all of the comments and, in some instances, 
revised the proposed regulations as appropriate. The comments have been 
grouped by issue and are discussed as follows.

1. Coast Guard Authority

    Seven comments suggested the regulations are intrusive into the 
lives of mariners and questioned the Coast Guard's authority to review 
information from the National Driver Register and review criminal 
record information in issuing licenses, CORs, or MMDs. OPA 90 
authorized the Coast Guard to conduct criminal record checks and review 
information from the National Driver Register on any individual 
applying for a license, COR, or MMD; for a renewal of a license, COR, 
or MMD; or for an endorsement of an MMD with a new expiration date. The 
Coast Guard is implementing these provisions to exclude from holding 
merchant mariner credentials those individuals whose history indicates 
a lack of concern regarding the safety of themselves, others, the 
marine environment, and the safe operation of a vessel.
    Two comments suggested that since the term ``renewal'' is not 
mentioned in 46 U.S.C. 7302(c) and (d), the review of criminal records 
and the National Driver Register only applies to original document 
applications. The Coast Guard disagrees. The review of criminal records 
and the NDR is relevant to all documents applied for under 46 U.S.C. 
7302, including renewal of MMDs or endorsement of MMDs with a new 
expiration date. Similarly, in 46 U.S.C. 7101(h), individuals applying 
for a license or COR include all individuals applying for a raise in 
grade or renewal.
    One comment stated that the Coast Guard, rather than the employer, 
is in the best position to monitor and provide assurance of 
rehabilitation for individuals with an alcohol or drug problem. The 
Coast Guard lacks the legal authority and resources to continuously 
monitor individuals with drug or alcohol problems. Checks can be made 
at a point convenient to the mariner and the Coast Guard, for example, 
renewal or raise in grade. Monitoring individuals is within the scope 
of employer responsibilities because the employer is more likely to 
evaluate an employee's work and conduct on a regular basis.
    Two comments stated that the regulations are unnecessary because 
the merchant marine is self-regulating. The comments submitted that 
mariners who pose a threat to the safe operation of a ship, personnel, 
or passengers will be excluded by other mariners or employers. The 
Coast Guard determined that the mariners' or employer's ability to 
self-regulate cannot attain the scope of the Coast Guard's ability to 
regulate merchant marine personnel. Also, the Coast Guard has been 
delegated the authority of general superintendence over the merchant 
marine and merchant marine personnel in the interest of marine safety 
and seamen's welfare. The Coast Guard, as the agency authorized to 
issue merchant mariner's credentials, must ensure, to the best of its 
ability, that individuals who receive these credentials do not present 
a possible threat to personnel, passengers, or the safe operation of a 
vessel.

2. Relationship Between Convictions and Job Performance

    Eight comments suggested that there is little or no relationship 
between a person's criminal or driving offenses on 

[[Page 65480]]
land and their maritime related job performance. The Coast Guard 
disagrees. An individual's record of alcohol or drug-related, or other 
motor vehicle offenses as specified in sections 205(a)(3) (A) and (B) 
of the NDR Act of 1982, indicates that the individual may have a 
disregard for his or her own safety or the safety of others and 
therefore may not be suitable for maritime employment. The Conference 
Report on OPA 90 (H.R. Conf. Rep. No. 101-653) explains that alcohol 
impairment may have played a role in the Exxon Valdez incident. Motor 
vehicle offenses involving the abuse of alcohol and drugs may evince 
possible unsafe vessel operations. Congressional intent, as presented 
in the Conference Report on OPA 90, was to provide an additional tool 
in an effort to promote a drug- and alcohol-free workplace in maritime 
industry. Also, the Coast Guard concluded that applicants who have been 
convicted of violent criminal offenses or serious property offenses may 
pose a threat to ship personnel, passengers, the marine environment, 
and the safe operation of the ship. The Coast Guard may increase ship 
safety by denying seafarer's documents to individuals who demonstrate a 
lack of concern for safety through a record of criminal or motor 
vehicle offenses.

3. The National Driver Register

    Two comments indicated that the Coast Guard is only able to review 
information from the National Driver Register three years prior to the 
check. The comments noted that the information from an NDR file check 
would not cover the full 5 years between document renewal. The NDR Act 
prohibits the Coast Guard from gaining access to information more than 
three years old, unless the information is about a revocation or 
suspension of driving privileges still in effect (49 U.S.C. 
30305(b)(5)).
    One comment suggested that NDR checks may be a federalism issue, 
since most driving offenses are state offenses. The Coast Guard is 
among the authorized agencies granted access to the NDR. The NDR Act 
establishes guidelines for obtaining information from the NDR for the 
purposes of evaluating individuals who hold, or are applying for a 
license or certificate of registry under 46 U.S.C. 7101, or a merchant 
mariner's document under 46 U.S.C. 7302 (49 U.S.C. 30305(b)(5)).
    One comment requested clarification of ``racing on the highways.'' 
According to the National Highway Traffic Safety Administration, racing 
on the highways means formal or informal contest racing on a public 
highway.
    Another comment stated that if the NDR is a voluntary system, the 
Coast Guard may not be able to check information from non-participating 
states. Since all of the states and the District of Columbia are 
participants in the NDR program, the Coast Guard can conduct checks on 
any individual in the United States with motor vehicle driving record 
information.
    One comment noted a decision rendered on April 5, 1995, by the 
United States Circuit Court for the Fourth Circuit in a case entitled, 
American Trucking Associations Inc. v. Federal Highway Administration. 
In that case, the court's decision was based on the fact that off-duty 
alcohol use is generally not relevant criteria in determining 
eligibility for employment. In its decision, the court was interpreting 
the Omnibus Transportation Employee Testing Act of 1991 (Pub. L. 102-
143), which applied to the Federal Aviation Administration, Federal 
Highway Administration, Federal Railroad Administration, and the 
Federal Transit Administration, but not to the Coast Guard. This case 
involved preemployment testing requirements for alcohol use. This final 
rule is under separate authority and does not involve the preemployment 
testing of individuals for alcohol.
    The Coast Guard is providing information to applicants who wish to 
conduct an NDR file check for their personal use. The NDR allows 
individuals to request a file check in accordance with the Federal 
Privacy Act of 1974 (Pub. L. 93-579). New sections 10.201(i)(4) and 
12.02-4(d)(4) describe the procedures to follow to receive the results 
of a NDR file check. The information in a personal NDR file check is 
intended for use by the applicant only, and may not be used in the 
licensing and certification process.
    The Coast Guard concluded the term ``NDR listed convictions'' 
needed further clarification. The final rule adds a definition for 
``NDR listed convictions'' to its list of definitions in Sec. 10.103 
and Sec. 12.01-6. The new definition will reflect the convictions in 49 
U.S.C. 30304(a)(3)(A) and (B) which are authorized by the National 
Highway Safety Transportation Administration to be used by the Coast 
Guard to evaluate applicants for merchant mariner's documents.
    In the NPRM, Sec. 10.201(b) and Sec. 12.02-4(a) did not discuss 
individuals with NDR convictions due to the addiction or abuse of 
alcohol. The Coast Guard added a statement to Sec. 10.201(b) and 
Sec. 12.02-4(a) to ensure individuals with such NDR convictions furnish 
satisfactory evidence of suitability for service in the merchant 
mariner to be eligible for a license, COR, or a merchant mariner's 
document.

4. Past Offenses

    Several comments recommended implementing these regulations in a 
prospective manner, where the Coast Guard would only consider offenses 
occurring after the effective date of the regulations. These comments 
stated that, in the past, many mariners have not challenged false 
charges due to their work schedule and the threat of loss of 
employment. The regulations allow mariners ample opportunity to provide 
the OCMI with evidence of suitability for service in the merchant 
marine, and to explain the circumstances of an offense. If the 
application is denied, an appeal process and reconsideration are 
available.
    A few comments suggested that mariners would have altered their 
behavior if they had prior knowledge of the effect of off-duty conduct 
on employment. In the past, the Coast Guard has been conducting 
criminal record review for original applications for licenses and CORs, 
and under existing practice conducts a criminal record review of 
original applicants for MMDs. Applicants are already accountable for 
past behavior when they apply for their original documents. The Coast 
Guard is expanding its requirements to include spot-checks of 
individuals applying for a raise in grade of a license, COR, or MMD; an 
endorsement on a MMD with a new expiration date; and a renewal of a 
license, COR, or MMD. The NDR checks were created to identify vessel 
personnel with motor vehicle offenses related to the use of alcohol and 
drugs or the unsafe operation of a motor vehicle. The Coast Guard 
determined that the certification and licensing of persons involved 
with the abuse of these substances or the unsafe operation of a motor 
vehicle may lead to unsafe vessel operations.
    Some comments discussed the Coast Guard's consideration of charges 
against mariners that have been stricken from the record through 
remediation or compensation and how this defeats public policy and 
discourages individuals from participating in remediation or 
compensation. As stated in the definition of ``conviction'' provided in 
this final rule, a later expungement of the conviction will not negate 
a conviction unless it is proved to the OCMI that the expungement is 
based upon a showing that the court's earlier conviction was in error. 
The Coast Guard concluded that consideration of all convictions is 

[[Page 65481]]
important to determining the character and habits of life of applicants 
for merchant mariner's credentials.
    Four comments stated that denial of credentials on the grounds of a 
past offense is punishing an individual twice for the same offense, and 
for this reason the final rule is unconstitutional. The Coast Guard 
disagrees. Merchant mariner's credentials are certificates of 
qualification that authorize individuals to perform certain duties on a 
vessel. In the interest of marine safety, the Coast Guard examines 
applicants to determine their suitability to hold merchant marine 
credentials. Past offenses are a good indicator of whether a person is 
a possible threat to the safety of ship operation, personnel, the 
marine environment, or passengers. Basing the decision of whether to 
grant a merchant mariner's credentials on the factors articulated in 
this rule is not punishment of those whose applications are denied. It 
is instead a reasonable way to protect life and property at sea.
    The Coast Guard added the statement, ``Applicants must provide 
written disclosure for all prior convictions at the time of 
application,'' to Sec. 10.201(h) and Sec. 12.02-4(c). The sentence will 
provide consistency between this final rule and the current application 
procedures.

5. Assessment Periods

    Five comments addressed the minimum and maximum assessment periods 
for which the OCMI will consider a conviction in the evaluation of an 
applicant for merchant mariner's credentials.
    One comment expressed that the assessment periods appeared to be 
arbitrary. The Coast Guard has reviewed three reports from the U.S. 
Department of Justice, Bureau of Justice Statistics (BJS). These 
reports are entitled, ``Recidivism of Prisoners Released in 1983'', 
Recidivism of Felons on Probation, 1988-1989,'' and ``Recidivism of 
Young Parolees''. The reports revealed high rates of rearrest for 
released prisoners, felons on probation, and young parolees. Based on a 
sample of State prisoners released in 1983, 62.5 percent were 
rearrested for a felony or serious misdemeanor within 3 years. Using a 
sample of felons sentenced to probation in 1986, a report found that 62 
percent of the probationers either had a disciplinary hearing for 
violating a condition of their probation or were arrested for another 
felony within three years. Another BJS study, based on a sample of 
young parolees between the ages of 17 and 22, found that 69 percent of 
young parolees were rearrested for a serious crime within 6 years of 
their release from prison. One of the reports found that of the 
prisoners in the study, those with a prior arrest for a violent offense 
had a greater likelihood of rearrest than other released prisoners. 
Therefore, the categories of violent crimes in Tables 10.201(h) and 
12.02-4(c) have longer assessment periods. The Coast Guard determined 
that the assessment periods, as published in the NPRM, are a sufficient 
guideline for the OCMI to consider the convictions of applicants. The 
assessment periods take into account both recidivism of the categories 
of crimes and the consequences of their occurrence.
    Several comments suggested reducing the length of the assessment 
periods and including supervised parole or probation as part of the 
assessment periods. The Coast Guard established the assessment periods 
as guidelines for the OCMI when evaluating an applicant with criminal 
convictions. The assessment periods do not prevent an individual from 
applying before the minimum assessment period has elapsed or between 
minimum and maximum assessment periods.
    A person who applies before the minimum time period has elapsed 
must provide the OCMI with evidence of suitability for maritime 
employment. This final rule provides a list of factors in 
Sec. 10.201(j) and Sec. 12.02-4(e) for the OCMI to use as a guide in 
considering an applicant before the minimum assessment period has 
elapsed.
    The applicant may also apply for merchant mariner's credentials 
between the minimum and maximum assessment periods. During this period, 
the Coast Guard will issue a license, COR, or MMD to the applicant 
unless there are offsetting factors. Type of offsetting factors are 
listed in Sec. 10.201(h)(5) and Sec. 12.02-4(c)(5).
    After further review, the Coast Guard determined that the OCMI 
would benefit from examining periods of supervised probation and parole 
as part of the assessment periods. Periods of supervised probation and 
parole, like periods of unsupervised probation and parole, allow 
individuals to adjust to civilian life. Therefore, the OCMI may include 
periods of probation and parole in the assessment periods with a letter 
of recommendation from a parole or probation officer. The Coast Guard 
also revised Sec. 10.201(h)(2) and Sec. 12.02-4(c)(2) to clarify when 
the assessment period commences.
    One comment objected to the evaluating factor in Secs. 10.201(j) 
and 12.02-4(e) concerning membership in a rehabilitation group. The 
comment noted that many of these groups are anonymous and information 
on membership and attendance is usually confidential or nonexistent. 
The Coast Guard will accept as proof of active membership a broad range 
of items, such as a letter from a counselor, or the signature or stamp 
of a secretary from the group an individual is attending.

6. Direct and Indirect Benefits

    Three comments recommended supporting the benefit analysis in the 
NPRM with statistical data. The Coast Guard stated in the NPRM that the 
direct and societal benefits from this final rule are not quantifiable. 
Historical data are insufficient to perform an analysis of benefits. 
The Coast Guard concluded that even if maritime accidents are reduced 
by a small percentage, savings will accrue to the maritime industry 
through lower repair and medical costs and to the public through 
environmental protection.

7. Additional Comments and Changes

    Another comment suggested that the OCMI consider dangerous drug 
offenses more than ten years prior to the application for a license, 
COR, or MMD if there are subsequent dangerous drug offenses. The Coast 
Guard determined that consideration of dangerous drug convictions 
occurring ten years before application combined with subsequent 
violations are helpful in establishing a behavior pattern. The Coast 
Guard is amending Sec. 10.201(h)(2) and Sec. 12.02-4(c)(2) to include 
dangerous drug convictions occurring more than 10 years prior to the 
date of application if an individual has subsequent violations. Tables 
10.201(h) and 12.02-4(c) were also amended to reflect the consideration 
of dangerous drug offenses more than 10 years old if there are 
subsequent dangerous drug offenses.
    The Coast Guard determined that some NDR convictions could also be 
criminal convictions. When deciding on an appropriate assessment 
period, the OCMI should be able to use the guidelines found in the 
criminal conviction table and the NDR conviction table. Therefore, 
Sec. 10.201(h)(3) and Sec. 12.02-4(c)(3) were revised to add Table 
10.201(i) and Table 12.02-4(d), respectively. Also, Sec. 10.201(i) and 
Sec. 12.02-4(d) were revised to allow the OCMI to use criminal 
conviction assessment period guidelines where appropriate.
    The Coast Guard revised Tables 10.201(i) and 12.02-4(d) to clarify 
the assessment period for 2 or more motor vehicle convictions. The 
phrase ``which ever is longer'' was deleted from the assessment period 
of applicants for merchant mariner's documents, licenses, and 
certificates of registry with 

[[Page 65482]]
2 or more motor vehicle convictions involving dangerous drugs or 
alcohol.
    The Coast Guard revised Sec. 10.201(j) and Sec. 12.02-4(e) to 
include applicants who are users of, or addicted to dangerous drugs. 
This revision was made to ensure consistency with Sec. 10.201(b) and 
Sec. 12.02-4(e).
    The other comments received were general in nature and supported 
this Coast Guard rulemaking.

Regulatory Evaluation

    This final rule is not a significant regulatory action under 
section 3(f) of Executive Order 12866 and does not require an 
assessment of potential costs and benefits under section 6(a)(3) of 
that order. It has not been reviewed by the Office of Management and 
Budget under that order. It is not significant under the regulatory 
policies and procedures of the Department of Transportation (DOT) (44 
FR 11040; February 26, 1979).
    A final Regulatory Evaluation under paragraph 10e of the regulatory 
policies and procedures of DOT has been prepared and is available in 
the docket for inspection or copying where indicated under ADDRESSES. 
The Evaluation is summarized as follows.

1. Criminal Record Review

    Coast Guard costs attributable to implementing the provisions 
authorizing the criminal record review of applicants for licenses, 
CORs, and MMDs in sections 4101(a) and 4102(e) of OPA 90 will be 
incurred by the RECs and Coast Guard Headquarters. These costs are 
associated with reviewing and processing the criminal record review 
data through the Federal Bureau of Investigation (FBI). The REC will 
assume the primary responsibility for the final review of the criminal 
record report received from the FBI.
    Because current Coast Guard regulations and practices require all 
applicants for the original issuance of licenses, CORs, or MMDs to 
submit to criminal record reviews by the taking of fingerprints, these 
costs are not newly incurred as a result of this rulemaking, and 
therefore, are not included in this regulatory assessment. The costs 
associated with the requirements for criminal record reviews apply only 
to a raise in grade of a license or COR; an endorsement on an MMD with 
a new expiration date; or renewal of a license, COR, or MMD. The Coast 
Guard plans to spot-check the criminal records of individuals applying 
for these merchant mariner credentials. For the purpose of estimating 
costs, the Coast Guard has assumed that 1 of every 30 of these 
applicants will be spot-checked.
    Approximately 10,881 licenses are expected to be renewed each year. 
An estimated 363 (10,881/30) spot criminal record checks will be 
performed on these applicants.
    Approximately 18,000 MMDs are expected to be renewed each year. An 
estimated 600 (18,000/30) spot criminal record checks will be done on 
these applicants.
    Approximately 300 CORs are expected to be renewed each year. An 
estimated 10 (300/30) spot criminal record checks will be performed on 
these applicants.
    Approximately 3,740 raises of grade for license and COR 
endorsements are expected to be issued each year. An estimated 125 
(3,740/30) spot criminal record checks will be performed on these 
applicants.
    Approximatley 4,025 supplemental MMD endorsements are issued each 
year. An estimated 134 (4,025/30) spot criminal record checks will be 
done on these applicants.
    The total number of spot criminal record checks will amount to 
approximately 1,232 (See Table I.).

                                 Table I                                
------------------------------------------------------------------------
          Type of action              No. applicants      No. checked   
------------------------------------------------------------------------
License Renewal...................             10,881                363
MMD Renewals......................             18,000                600
COR Renewals......................                300                 10
Raise of grade (licenses) and                                           
 higher grade of COR..............              3,740                125
Supplemental endorsements (MMDs)..              4,025                134
                                                      ------------------
    Total Number of Spot Criminal                                       
     Record Checks................  .................              1,232
------------------------------------------------------------------------

    It will cost the Coast Guard approximately $17 per criminal record 
check to process the fingerprints through the FBI for an estimated 
annual cost of $20,944.
    Based on a sample survey of the REC's experience with criminal 
records conducted by the Coast Guard in 1992, 8 percent of the 
applicants are estimated to have records with the FBI. Of those with 
records, it is estimated that 9 percent have records significant to the 
application evaluation. Thus, only 0.72 percent of the applicants had 
actionable convictions on their records. Therefore, of the reissue and 
renewal applicants sampled, it is estimated that 99 will have records 
with the FBI, and a total of 9 of the 1,232 applicants will have 
records significant to the license evaluation. The Coast Guard 
estimates that the costs for the 99 applicants with convictions to 
furnish the necessary documents to exonerate themselves will be 
minimal. Costs are expected to total approximately $19 per court record 
for aggregate annual applicant costs of approximately $1,900.
    The Coast Guard estimates that 75 percent, or 924, of the spot-
checked applicants for a raise in grade of a license or COR, a renewal 
of a license or COR, or any MMD with a new expiration date will apply 
by mail. For those 924 applicants, the estimated costs include the time 
for the applicant to go to his or her local police department, submit 
to fingerprinting, and return to his or her residence. The Coast Guard 
estimates that this would take approximately 1.5 hrs. of the 
applicant's time. Total respondent costs are estimated to be $22,700.
    Twenty-five percent, or 308, of the spot-checked applicants are 
expected to choose to go to an REC to conduct their renewal 
transactions. For those 308 applicants, additional costs attributed to 
the criminal record check will be insignificant.

2. National Driver Register Access

    The Coast Guard estimates that it will conduct 57,435 NDR checks 
annually for all individuals applying for the original issuance, 
renewal, or endorsement with a new expiration date of merchant 
mariner's credentials. The Coast Guard's costs for NDR checks involve 
providing an interface with the NDR computer and clerical resources to 
process record checks and notifications to applicants with NDR records. 
These costs are estimated to be $120,000 annually, with the potential 
for substantial reduction in cost if direct 

[[Page 65483]]

access to the NDR data by the RECs is authorized. The RECs will write 
letters to those applicants who have a probable identification (hit), 
and review any associated court records as forwarded by applicants.
    The Coast Guard estimates that initial computer hardware and 
software and necessary connection to the NDR will be under $20,000. The 
Coast Guard estimates the annual cost of a dedicated telephone line 
from Coast Guard Headquarters to the Commonwealth of Virginia will be 
$12,000 ($6/hr. x 8 hrs./day x 250 days/yr.). The initial annual Coast 
Guard REC costs are estimated to be $58,354 (57,435 checks x 0.05 hr./
check x /$20/hr. for a clerical employee, plus $0.32/stamp x 2,872 
hits). Initially, the Coast Guard will dedicate one full-time clerical 
employee at Coast Guard Headquarters to forward data to the 
Commonwealth of Virginia for processing. This cost is estimated to be 
$40,000 ($20/hr. for a clerical employee x 8 hrs./day x 250 days). 
Therefore, the initial annual Coast Guard cost associated with the 
National Driver Register portion of the rule is estimated to total 
approximately $111,400.
    Annual respondent costs associated with NDR checks include the time 
to fill out the NDR consent form which is considered to be 
insignificant. In 50 percent of the 2,872 hits, or 1,436 cases, 
applicants will have clean driving records and the OCMI will issue 
their merchant mariner's credentials without further expense. For the 
other 50 percent of applicants, or 1,436, costs are expected to be less 
than $20.00 per court record submitted to the Coast Guard for estimated 
annual respondent costs of $26,700.
    The dollar value of direct and societal benefits flowing from spot-
checking applicants' criminal records and from reviewing applicants' 
NDR records are not quantifiable but may be substantial.
    The Coast Guard anticipates that, as a result of this rule, a 
number of applicants will be identified, based upon their criminal 
record or adverse driving record, whose conduct indicates that they 
should not be trusted to safely perform shipboard duties. Those 
applicants will not be granted merchant mariner credentials.
    Direct benefits would include the potential for--
     Fewer margin groundings and other accidents;
     Reduced property loss;
     Fewer releases of oil and hazardous materials into the 
marine environment; and
     Fewer injuries and reduced loss of life among merchant 
mariners and other seagoing personnel.
    The Coast Guard also anticipates several indirect benefits. Within 
the community of applicants for merchant mariner's credentials, 
knowledge of the Coast Guard's enhanced periodic record-checking 
program may dissuade recidivism among merchant mariners with past 
criminal, or serious traffic records. The program may also discourage 
some convicted criminals, users of dangerous drugs, and serious traffic 
offenders from seeking new credentials or renewals, and may also 
encourage some applicants who are convicted criminals or users of 
dangerous drugs to truthfully complete questions that address these 
issues on the applications forms. Users of dangerous drugs in the U.S. 
merchant marine may be encouraged to seek counseling and treatment 
before incurring a criminal record or dangerous drug history with the 
FBI. In addition, merchant mariners and prospective merchant mariners 
may be encouraged to maintain a satisfactory standard of personal 
conduct.
    Historical data are insufficient to quantify benefits; however, 
should this program manage to save even one line per year at $2.7 
million per statistical life saved (which reflects a reasonable 
estimate of people's presumed willingness-to-pay for safety), its 
benefits would exceed its costs. If maritime accidents were reduced 
even by a small percentage, savings would accrue to the maritime 
industry through lower repair and medical costs and to the public 
through environmental protection.

Small Entities

    The costs to small entities will not be significant because the 
costs of spot-checking applicants' criminal records and reviewing NDR 
records will be borne by the Coast Guard. The Coast Guard expects the 
impact of this regulation on small entities to be minimal. Therefore, 
the Coast Guard certifies under section 605(b) of the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.) that this rule will not have a 
significant economic impact on a substantial number of small entities.

Collection of Information

    This rule contains collection-of-information requirements. The 
Coast Guard has submitted the requirements to the office of Management 
and Budget (OMB) for review under section 3504(h) of the Paperwork 
Reduction Act (44 U.S.C. 3501 et seq.), and OMB has approved them. The 
section numbers are Secs. 10.201, 10.205, 10.207, 10.209, 10.805, 
12.02-4, and 12.02-9. The corresponding OMB number is OMB Control 
Number 2115-0514.

Federalism

    The Coast Guard has analyzed these regulations under the principles 
and criteria contained in Executive Order 12612 and has determined that 
this rule does not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this rule 
and concluded that, under paragraph 2.B.2 of Commandant Instruction 
M16475.1B, the regulations are categorically excluded from further 
environmental documentation. Paragraph 2.B.2 of that instruction 
excludes administrative actions and procedural regulations and policies 
which clearly do not have any environmental impact. A ``Categorical 
Exclusion Determination'' is available in the docket for inspection or 
copying where indicated under ADDRESSES.

List of Subjects

46 CFR Part 10

    Fees, Reporting and recordkeeping requirements, Schools, Seamen.

46 CFR Part 12

    Fees, Reporting and recordkeeping requirements, Seamen.

    For the reasons set out in the preamble, the Coast Guard amends 46 
CFR parts 10 and 12 as follows:

PART 10--LICENSING OF MARITIME PERSONNEL

    1. The authority citation for part 10 is revised to read as 
follows:

    Authority: 31 U.S.C. 9701; 46 U.S.C. 2101, 2103, 2110, 7101, 
7106, 7107, 7109, 7302, 7505, 7701; 49 CFR 1.46. Section 10.107 also 
issued under 44 U.S.C. 3507.

    2. In Sec. 10.103, the definitions of ``conviction,'' ``National 
Driver Register,'' and ``NDR listed convictions'' are added to read as 
follows:

Sec. 10.103  Definitions of terms used in this part.

* * * * *
    Conviction means the applicant for a license or certificate of 
registry has been found guilty by judgment or plea by a court of record 
of the United States, the District of Columbia or any State or 
territory of the United States of a criminal felony or misdemeanor or 
of an offense described in section 205 of the National Driver Register 
Act of 1982 (49 U.S.C. 30304). Conviction of more than 

[[Page 65484]]
one offense at a single trial will be considered to be multiple 
convictions. If an applicant pleads guilty or no contest, is granted 
deferred adjudication, or is required by the court to attend classes, 
make contributions of time or money, receive treatment, submit to any 
manner of probation or supervision, or forego appeal of a trial court's 
conviction, then the applicant will be considered to have received a 
conviction. A later expungement of the conviction will not negate a 
conviction unless it is proved to the OCMI that the expungement is 
based upon a showing that the court's earlier conviction was in error.
* * * * *
    National Driver Register (NDR) means the nationwide repository of 
information on drivers maintained by the National Highway Traffic 
Safety Administration as provided under 49 U.S.C. Chapter 303.
    NDR listed convictions means a conviction of any of the following 
motor vehicle-related offenses or comparable offenses:
    (a) Operating a motor vehicle while under the influence of, or 
impaired by, alcohol or a controlled substance; or
    (b) A traffic violation arising in connection with a fatal traffic 
accident, reckless driving, or racing on the highways.
* * * * *
    3. In Sec. 10.201, paragraph (b) is revised and paragraphs (h), 
(i), and (j) are added to read as follows:

Sec. 10.201  Eligibility for licenses and certificates of registry, 
general.

* * * * *
    (b) No person who has been convicted by a court of record of a 
violation of the dangerous drug laws of the United States, the District 
of Columbia, or any State or territory of the United States is eligible 
for a license or certificate of registry, except as provided by the 
provisions of paragraph (h) of this section. No person who has ever 
been the user of, or addicted to the use of, a dangerous drug, or has 
ever been convicted of an offense described in section 205 of the 
National Driver Register Act of 1982 (49 U.S.C. 30304) due to the 
addiction or abuse of alcohol is eligible for a license or certificate 
of registry unless he or she furnishes satisfactory evidence of 
suitability for service in the merchant marine as provided in paragraph 
(j) of this section.
* * * * *
    (h) Criminal Record Review. The OCMI may review the criminal record 
of an applicant for the issuance of a license or certificate of 
registry issued as an original or reissued with a new expiration date. 
An applicant conducting simultaneous merchant mariner's credential 
transactions shall undergo only one criminal record check. Applicants 
must provide written disclosure of all prior convictions at the time of 
application.
    (1) If the applicant is advised that a criminal record check is 
required by the OCMI, applicants shall provide their fingerprints at 
the time of application. The fingerprints will be used to determine 
whether the applicant has a record of a criminal conviction. An 
application may be disapproved if a criminal record review leads the 
OCMI to determine that the applicant's habits of life and character are 
such that the applicant cannot be entrusted with the duties and 
responsibilities of the license or certificate of registry for which 
application is made. If an application is disapproved, the OCMI will 
notify the applicant in writing of the reason(s) for disapproval and 
advise the applicant that the reconsideration and appeal procedures in 
Sec. 1.03 of this chapter apply. No examination will be given pending 
decision on appeal.
    (2) The OCMI may use Table 10.201(h) to evaluate applicants for 
licenses and certificates of registry who have criminal convictions. 
The table lists major categories of criminal activity and is not to be 
construed as an all-inclusive list. If an applicant is convicted of an 
offense that does not appear on the list, the OCMI will establish an 
appropriate assessment period using the list as a guide. The assessment 
period commences when an applicant is no longer incarcerated. The 
applicant must establish proof of the time incarcerated and periods of 
probation and parole to the satisfaction of the OCMI. The assessment 
period may include supervised or unsupervised probation or parole. A 
conviction for a drug offense more than 10 years prior to the date of 
application will not alone be grounds for denial.
    (3) When an applicant has convictions for more than one offense, 
the minimum assessment period will be the longest minimum in Table 
10.201(h) and Table 10.201(i) based upon the applicant's convictions; 
the maximum assessment period will be the longest shown in Table 
10.201(h) and Table 10.201(i) based upon the applicant's convictions.
    (4) If a person with a criminal conviction applies for a license or 
certificate of registry before the minimum assessment period shown in 
Table 10.201(h), or established by the OCMI under paragraph (h)(2) of 
this section has elapsed, then the applicant must provide evidence of 
suitability for service in the merchant marine. Factors which are 
evidence of suitability for service in the merchant marine are listed 
in paragraph (j) of this section. The OCMI will consider the 
applicant's evidence and may issue the license or certificate of 
registry in less than the listed minimum assessment period if the OCMI 
is satisfied that the applicant is suitable to hold the license or 
certificate of registry for which he or she has applied. If an 
applicant does not provide evidence of suitability for service in the 
merchant marine, then the application will be considered incomplete and 
will not be processed by the OCMI.
    (5) If a person with a criminal conviction applies for a license or 
certificate of registry during the time between the minimum and maximum 
assessment periods shown in Table 10.201(h) or established by the OCMI 
under paragraph (h)(2) of this section, the OCMI will consider the 
conviction and, unless there are offsetting factors, may grant the 
applicant the license or certificate of registry for which he or she 
has applied. Offsetting factors include multiple convictions, failure 
to comply with court orders (e.g., child support orders), previous 
failures at rehabilitation or reform, inability to maintain steady 
employment, or any connection between the crime and the safe operation 
of a vessel. If the OCMI considers the applicant unsuitable for service 
in the merchant marine at the time of application, the OCMI will 
disapprove the application.
    (6) If a person with a criminal conviction applies for a license or 
certificate of registry after the maximum assessment period shown in 
Table 10.201(h) or established by the OCMI under paragraph (h)(2) of 
this section has elapsed, then the OCMI will grant the applicant the 
license or certificate of registry for which he or she has applied 
unless the OCMI has reason to believe the applicant is still unsuitable 
for service in the merchant marine. If the OCMI disapproves an 
application based upon a conviction older than the maximum assessment 
period, the OCMI will notify the applicant in writing of the reason(s) 
for the disapproval. The OCMI will also inform the applicant, in 
writing, that the reconsideration and appeal procedures contained in 
Sec. 1.03 of this chapter apply.

                                                                        

[[Page 65485]]
    Table 10.201(h).--Guidelines for Evaluating Applicants for Licenses and Certificates of Registry Who Have   
                                              Criminal Convictions                                              
----------------------------------------------------------------------------------------------------------------
                                                                      Assessment periods                        
                  Crime\1\                  --------------------------------------------------------------------
                                                          Minimum                            Maximum            
----------------------------------------------------------------------------------------------------------------
                                             Crimes Against Persons                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Homicide (intentional).....................  7 years..........................  20 years.                       
Homicide (unintentional)...................  5 years..........................  10 years.                       
Assault (aggravated).......................  5 years..........................  10 years.                       
Assault (simple)...........................  1 year...........................  5 years.                        
Sexual Assault (rape, child molestation)...  5 years..........................  10 years.                       
Robbery....................................  5 years..........................  10 years.                       
Other crimes against persons \2\...........                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                             Crimes Against Property                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Burglary...................................  3 years..........................  10 years.                       
Larceny (embezzlement).....................  3 years..........................  5 years.                        
Other crimes against property \2\..........                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Vehicular Crimes                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Conviction involving fatality..............  1 year...........................  5 years.                        
Reckless Driving...........................  1 year...........................  2 years.                        
Racing on the Highways.....................  1 year...........................  2 years.                        
Other vehicular crimes \2\.................                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Crimes Against Public Safety                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Destruction of Property....................  5 years..........................  10 years.                       
Other crimes against public safety \2\.....                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                       Crimes Involving National Security                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Terrorism, Acts of Sabotage, Espionage and   7 years..........................  20 years.                       
 related offenses.                                                                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Criminal Violations of Environmental Laws                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Criminal violations of environmental laws    1 year...........................  10 years.                       
 involving improper handling of pollutants                                                                      
 or hazardous materials.                                                                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                         Dangerous Drug Offenses 3, 4, 5                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Trafficking (sale, distribution, transfer).  5 years..........................  10 years.                       
Dangerous drugs (Use or possession)........  1 year...........................  10 years.                       
Other dangerous drug convictions \6\.......                                                                     
----------------------------------------------------------------------------------------------------------------
\1\ Conviction of attempt, solicitation, aiding and abetting, accessory after the fact, and conspiracy to commit
  the criminal conduct listed in this table carry the same minimum and maximum assessment periods provided in   
  the table.                                                                                                    
\2\ Other crimes are to be reviewed by the OCMI to determine the minimum and maximum assessment periods         
  depending on the nature of the crime.                                                                         
\3\ Applicable only to original applications for licenses or CORs. Any applicant who has ever been the user of, 
  or addicted to the use of, a dangerous drug shall meet the requirements of paragraph (b) of this section.     
  Note: Applicants for reissue of a license or COR with a new expiration date including a renewal or a raise of 
  grade, who have been convicted of a dangerous drug offense while holding a license or COR, may have their     
  applications withheld until appropriate action has been completed by the OCMI under the regulations which     
  appear in 46 CFR part 5 governing administrative actions against merchant mariner credentials.                
\4\ The OCMI may consider dangerous drug convictions more than 10 years old only if there has been a dangerous  
  drug conviction within the past 10 years.                                                                     
\5\ Applicants must demonstrate rehabilitation under paragraph (j) of this section, including applicants with   
  dangerous drug use convictions more than ten years old.                                                       
\6\ Other dangerous drug convictions are to be reviewed by the Officer in Charge, Marine Inspection on a case by
  case basis to determine the appropriate assessment periods depending on the nature of the offense.            

    (i) National Driver Register. A license or certificate of registry 
will not be issued as an original or reissued with a new expiration 
date unless the applicant consents to a check of the NDR for offenses 
described in section 205(a)(3) (A) or (B) of the NDR Act (i.e., 
operation of a motor vehicle while under the influence of, or impaired 
by, alcohol or a controlled substance; and any traffic violations 
arising in connection with a fatal traffic accident, reckless driving, 
or racing on the highways). The OCMI will not consider NDR listed civil 
convictions that are more than 3 years old from the date of request 
unless that information relates to the current suspension or revocation 
of the applicant's license to operate a motor vehicle. The OCMI may 
determine minimum and maximum 

[[Page 65486]]
assessment periods for NDR listed criminal convictions using Table 
10.201(h). An applicant conducting simultaneous merchant mariner's 
credential transactions is subject to only one NDR check.
    (1) Any application may be disapproved if information from the NDR 
check leads the OCMI to determine that the applicant cannot be 
entrusted with the duties and responsibilities of the license or 
certificate of registry for which the application is made. If an 
application is disapproved, the OCMI will notify the applicant in 
writing of the reason(s) for disapproval and advise the application 
that the appeal procedures in Sec. 1.03 of this chapter apply. No 
examination will be given pending decision on appeal.
    (2) Prior to disapproving an application because of information 
received from the NDR, the OCMI will make the information available to 
the applicant for review and written comment. The applicant may submit 
records from the applicable State concerning driving record and 
convictions to the Coast Guard Regional Examination Center (REC) 
processing the application. The REC will hold an application with NDR 
listed convictions pending the completion of the evaluation and 
delivery by the individual of the underlying State records.
    (3) The guidelines in Table 10.201(i) will be used by the OCMI in 
evaluating applicants for licenses and certificates of registry who 
have drug or alcohol related NDR listed convictions. Non-drug or 
alcohol related NDR listed convictions will be evaluated by the OCMI 
under Table 10.201(h) as applicable.
    (4) An applicant may request an NDR file check for personal use in 
accordance with the Federal Privacy Act of 1974 (Pub. L. 93-579) by 
contacting the NDR at the following address: National Driver Register, 
Nassif Building, 400 7th Street, SW., Washington, DC 20590.
    (i) Applicants should request Form NDR-PRV or provide the following 
information on a notarized letter:
    (A) Full legal name;
    (B) Other names used;
    (C) Complete mailing address;
    (D) Driver license number;
    (E) Eye color;
    (F) Social security number;
    (G) Height;
    (H) Weight; and
    (I) Sex.
    (ii) The NDR will respond to every valid inquiry including requests 
which produce no record(s) on the NDR file. Records can be made 
available, within a reasonable amount of time after the request, for 
personal inspection and copying during regular working hours at 7:45 
a.m. to 4:15 p.m., each day except Federal holidays.

  Table 10.201(i).--Guidelines for Evaluating Applicants for Licenses and Certificates of Registry Who Have NDR 
                       Motor Vehicle Convictions Involving Dangerous Drugs or Alcohol \1\                       
----------------------------------------------------------------------------------------------------------------
        No. of convictions                      Date of conviction                      Assessment period       
----------------------------------------------------------------------------------------------------------------
1................................  Less than 1 year...........................  1 year from date of conviction. 
1................................  More than 1, less than 3 years.............  Application will be processed,  
                                                                                 unless suspension or revocation
                                                                                 \2\ is still in effect.        
                                                                                 Applicant will be advised that 
                                                                                 additional conviction(s) may   
                                                                                 jeopardize merchant mariner    
                                                                                 credentials.                   
1................................  More than 3 years old......................  Not necessary unless suspension 
                                                                                 or revocation is still in      
                                                                                 effect.                        
2 or more........................  Any less than 3 years old..................  1 year since last conviction and
                                                                                 at least 3 years from 2nd most 
                                                                                 recent conviction, unless      
                                                                                 suspension or revocation is    
                                                                                 still in effect.               
2 or more........................  All more than 3 years old..................  Application will be processed   
                                                                                 unless suspension or revocation
                                                                                 is still in effect.            
----------------------------------------------------------------------------------------------------------------
\1\ Any applicant who has ever been the user of, or addicted to the use of, a dangerous drug shall meet the     
  requirements of paragraph (b) of this section.                                                                
\2\ Suspension or revocation, when referred to in Table 10.201(i), means a State suspension or revocation of a  
  motor vehicle operator's license.                                                                             

    (j) If an applicant has one or more alcohol or dangerous drug 
related criminal or NDR listed convictions; if the applicant has ever 
been the user of, or addicted to the use of, a dangerous drug; or if 
the applicant applies before the minimum assessment period for his or 
her conviction has elapsed; the OCMI may consider the following 
factors, as applicable, in assessing the applicant's suitability to 
hold a license or certificate of registry. This list is intended as a 
guide for the OCMI. The OCMI may consider other factors which he or she 
judges appropriate to a particular applicant, such as:
    (1) Proof of completion of an accredited alcohol- or drug-abuse 
rehabilitation program.
    (2) Active membership in a rehabilitation or counseling group, such 
as Alcoholics Anonymous or Narcotics Anonymous.
    (3) Character references from persons who can attest to the 
applicant's sobriety, reliability, and suitability for employment in 
the merchant marine including parole or probation officers.
    (4) Steady employment.
    (5) Successful completion of all conditions of parole or probation.
    4. In Sec. 10.205, paragraph (f)(2) is revised and paragraph (k) is 
added to read as follows:

Sec. 10.205  Requriements for original licensees and certificates of 
registry.

* * * * *
    (f) * * *
    (1) * * *
    (2) The OCMI may review the criminal record check of each applicant 
for an original license or certificate of registry according to the 
procedures set forth in Sec. 10.201(h).
* * * * *
    (k) National Driver Register. Each applicant for an original 
license or certificate of registry shall consent to an NDR check under 
Sec. 10.201(i).
    5. In Sec. 10.207, paragraphs (h) and (i) are added to read as 
follows:

Sec. 10.207  Requirements for raise in grade of license.

* * * * *
    (h) Criminal Record Review. Each applicant for a raise of grade may 
be required to submit to a criminal record check under Sec. 10.201(h).
    (i) National Driver Register. Each applicant for a raise of grade 
of a license shall consent to an NDR check under Sec. 10.201(i) if the 
license is reissued with a new expiration date.
    6. In Sec. 10.209, paragraphs (i) and (j) are added to read as 
follows:

Sec. 10.209  Requirements for the renewal of licenses or certificates 
of registry.

* * * * *
    (i) Each applicant for a renewal may be required to consent to a 
criminal record check under Sec. 10.201(h).
    (j) Each applicant for renewal of a license or certificate of 
registry shall 

[[Page 65487]]
consent to an NDR check under Sec. 10.201(i).

PART 12--CERTIFICATION OF SEAMEN

    7. The authority citation for part 12 is revised to read as 
follows:

    Authority: 31 U.S.C. 9701; 46 U.S.C. 2101, 2103, 2110, 7301, 
7302, 7503, 7505, 7701; 49 CFR 1.46.

    8. In Sec. 12.01-6, the definitions of ``conviction,'' ``National 
Driver Register,'' and ``NDR listed convictions'' are added to read as 
follows:

Sec. 12.01-6  Definitions of terms used in this part.

* * * * *
    Conviction means the applicant for a merchant mariner's document 
has been found guilty by judgment or plea by a court of record of the 
Untied States, the District of Columbia or any State or territory of 
the United States of a criminal felony or misdemeanor or of an offense 
described in section 205 of the National Driver Register Act of 1982 
(49 U.S.C. 30304). If an applicant pleads guilty or no contest, is 
granted deferred adjudication, or is required by the court to attend 
classes, make contributions of time or money, receive treatment, submit 
to any manner of probation or supervision, or forego appeal of a trial 
court's conviction, then the applicant will be considered to have 
received a conviction. A later expungement of the conviction will not 
negate a conviction unless it is proved to the OCMI that the 
expungement is based upon a showing that the court's earlier conviction 
was in error.
* * * * *
    National Driver Register (NDR) means the nationwide repository of 
information on drivers maintained by the National Highway Traffic 
Safety Administration as provided under 49 U.S.C. Chapter 303.
    NDR listed convictions means a conviction of any of the following 
motor vehicle-related offenses or comparable offenses:
    (a) Operating a motor vehicle while under the influence of, or 
impaired by, alcohol or a controlled substance; or
    (b) A traffic violation arising in connection with a fatal traffic 
accident, reckless driving, or racing on the highways.
    9. In Sec. 12.02-4, paragraph (a) is revised, paragraph (b) is 
removed, existing paragraph (c) is redesignated as paragraph (b), and 
new paragraphs (c), (d) and (e) are added to read as follows:

Sec. 12.02-4  Basis for denial of documents.

    (a) No person who has been convicted by a court of record of a 
violation of the dangerous drug laws of the United States, the District 
of Columbia, or any State or territory of the United States is eligible 
for an original merchant mariner's document, except as provided by the 
provisions of paragraph (c) of this section. No person who has ever 
been the user of, or addicted to the use of, a dangerous drug, or has 
ever been convicted of an offense described in section 205 of the 
National Driver Register Act of 1982 (49 U.S.C. 30304) due to the 
addiction or abuse of alcohol is eligible for a merchant mariner's 
document unless he or she furnishes satisfactory evidence of 
suitability for service in the merchant marine as provided in paragraph 
(e) of this section.
* * * * *
    (c) Criminal Record Review. The Officer in Charge, Marine 
Inspection, may require a criminal record check of an applicant for a 
merchant mariner's document issued as an original or reissued with a 
new expiration date. An applicant conducting simultaneous merchant 
mariner's credential transactions shall undergo only one criminal 
record check. Applicants must provide written disclosure of all prior 
convictions at the time of application.
    (1) If a criminal record check is required by the Officer in 
Charge, Marine Inspection, applicants shall provide fingerprints at the 
time of application. The fingerprints will be used to determine whether 
the applicant has a record of a criminal conviction. An application may 
be disapproved if the individual's criminal record leads the Officer in 
Charge, Marine Inspection to determine that the applicant cannot be 
entrusted with the duties and responsibilities of the merchant 
mariner's document for which application is made. If an application is 
disapproved, the Officer in Charge, Marine Inspection will notify the 
applicant in writing of the reason(s) for disapproval and advise the 
applicant that the appeal procedures in Sec. 1.03 of this chapter 
apply. No examination will be given pending decision on appeal.
    (2) The Officer in Charge, Marine Inspection will use Table 12.02-
4(c) to evaluate applicants for merchant mariner's documents who have 
criminal convictions. The table lists major categories of criminal 
activity and is not to be construed as an all-inclusive list. If an 
applicant is convicted of an offense that does not appear on the list, 
the Officer in Charge, Marine Inspection will establish an appropriate 
assessment period using the list as a guide. The assessment period 
commences when an applicant is no longer 
FR Doc. 95-30677 National Driver Register and Criminal Record Review in Issuing Licenses, Certificates of Registry, or Merchant Mariner's Documents
incarcerated. The applicant 
must establish proof of the time incarcerated and periods of probation 
and parole to the satisfaction of the Officer in Charge, Marine 
Inspection. The assessment period may include supervised or 
unsupervised probation or parole. A conviction for a drug offense more 
than 10 years prior to the date of application will not alone be 
grounds for denial.
    (3) When an applicant has convictions for more than one offense, 
the minimum assessment period will be the longest minimum in Table 
12.02-4(c) and Table 12.02-4(d) based upon the applicant's convictions; 
the maximum assessment period will be the longest shown in Table 12.02-
4(c) and Table 12.02-4(d) based upon the applicant's convictions.
    (4) If a person with a criminal conviction applies for a merchant 
mariner's document before the minimum assessment period shown in Table 
12.02-4(c), or established by the Officer in Charge, Marine Inspection 
under paragraph (c)(2) of this section has elapsed, then the applicant 
must provide, as part of the application package, evidence of 
suitability for service in the merchant marine. Factors which are 
evidence of suitability for service in the merchant marine are listed 
in paragraph (e) of this section. The Officer in Charge, Marine 
Inspection will consider the applicant's evidence submitted with the 
application and may issue the merchant mariner's document in less than 
the listed minimum assessment period if the Officer in Charge, Marine 
Inspection is satisfied that the applicant is suitable to hold the 
merchant mariner's document for which he or she has applied. If an 
application filed before the minimum assessment period has elapsed does 
not include evidence of suitability for service in the merchant marine, 
then the application will be considered incomplete and will not be 
processed by the Officer in Charge, Marine Inspection until the 
applicant provides the necessary evidence as set forth in paragraph (e) 
of this section.
    (5) If a person with a criminal conviction applies for a merchant 
mariner's document during the time between the minimum and maximum 
assessment periods shown in Table 12.02-4(c) or established by the 
Officer in Charge, Marine Inspection under paragraph (c)(2) of this 
section, then the Officer in Charge, Marine Inspection shall consider 
the conviction and, unless there are offsetting factors, shall grant 
the applicant the merchant mariner's document for which he or she 

[[Page 65488]]
has applied. Offsetting factors include such factors as multiple 
convictions, failure to comply with court orders (e.g., child support 
orders), previous failures at rehabilitation or reform, inability to 
maintain steady employment, or any connection between the crime and the 
safe operation of a vessel. If the Officer in Charge, Marine Inspection 
considers the applicant unsuitable for service in the merchant marine 
at the time of application, the Officer in Charge, Marine Inspection 
may disapprove the application.
    (6) If a person with a criminal conviction applies for a merchant 
mariner's document after the maximum assessment period shown in Table 
12.02-4(c) or established by the Officer in Charge, Marine Inspection 
under paragraph (c)(2) of this section has elapsed, then the Officer in 
Charge, Marine Inspection will grant the applicant the merchant 
mariner's document for which he or she has applied unless the Officer 
in Charge, Marine Inspection considers the applicant still unsuitable 
for service in the merchant marine. If the Officer in Charge, Marine 
Inspection disapproves an applicant with a conviction older than the 
maximum assessment period listed in Table 12.02-4(c), the Officer in 
Charge, Marine Inspection will notify the applicant in writing of the 
reason(s) for the disapproval including the Officer in Charge, Marine 
Inspection's reason(s) for considering a conviction older than the 
maximum assessment period listed in Table 12.02-4(c). The Officer in 
Charge, Marine Inspection will also inform the applicant, in writing, 
that the reconsideration and appeal procedures contained in Sec. 1.03 
of this chapter apply.

   Table 12.02-4(c).--Guidelines for Evaluating Applicants for Merchant Mariner's Documents Who Have Criminal   
                                                   Convictions                                                  
----------------------------------------------------------------------------------------------------------------
                                                                      Assessment periods                        
                 Crime \1\                  --------------------------------------------------------------------
                                                          Minimum                            Maximum            
----------------------------------------------------------------------------------------------------------------
                                             Crimes Against Persons                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Homicide (intentional).....................  7 years..........................  20 years.                       
Homicide (unintentional)...................  5 years..........................  10 years.                       
Assault (aggravated).......................  5 years..........................  10 years.                       
Assault (simple)...........................  1 year...........................  5 years.                        
Sexual Assault (rape, child molestation)...  5 years..........................  10 years.                       
Other crimes against persons \2\...........                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Vehicular Crimes                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Conviction involving fatality..............  1 year...........................  5 years.                        
Reckless Driving...........................  1 year...........................  2 years.                        
Racing on the Highway......................  1 year...........................  2 years.                        
Other vehicular crimes \2\.................                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Crimes Against Public Safety                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Destruction of Property....................  5 years..........................  10 years.                       
Other crimes against public safety \2\.....                                                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                       Crimes Involving National Security                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Terrorism, Acts of Sabotage, Espionage and   7 years..........................  20 years.                       
 related offenses.                                                                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Dangerous Drug Offenses 3,4,5                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
Trafficking (sale, distribution, transfer).  5 years..........................  10 years.                       
Dangerous drugs (Use or possession)........  1 year...........................  10 years.                       
Other dangerous drug convictions \6\.......                                                                     
----------------------------------------------------------------------------------------------------------------
\1\ Conviction of attempts, solicitations, aiding and abetting, accessory after the fact, and conspiracies to   
  commit the criminal conduct listed in this table carry the same minimum and maximum assessment periods        
  provided in the table.                                                                                        
\2\ Other crimes are to be reviewed by the Officer in Charge, Marine Inspection to determine the minimum and    
  maximum assessment periods depending on the nature of the crime.                                              
\3\ Applicable to original applications only. Any applicant who has ever been the user of, or addicted to the   
  use of, a dangerous drug shall meet the requirements of paragraph (a) of this section. Note: Applicants for   
  reissue of a merchant mariner's document with a new expiration date including a renewal or additional         
  endorsement(s), who have been convicted of a dangerous drug offense while holding a merchant mariner's        
  document, may have their application withheld until appropriate action has been completed by the Officer in   
  Charge, Marine Inspection under the regulations which appear in 46 CFR part 5 governing the administrative    
  actions against merchant mariner credentials.                                                                 
\4\ The OCMI may consider dangerous drug convictions more than 10 years old only if there has been a dangerous  
  drug conviction within the past 10 years.                                                                     
\5\ Applicants must demonstrate rehabilitation under paragraph (e) of this section, including applicants with   
  dangerous drug use convictions more than ten years old.                                                       
\6\ Other dangerous drug convictions are to be reviewed by the Officer in Charge, Marine Inspection on a case by
  case basis to determine the appropriate assessment period depending on the nature of the offense.             

[[Page 65489]]

    (d) National Driver Register. A merchant mariner's document will 
not be issued or reissued with a new expiration date unless the 
applicant consents to a check of the NDR for offenses described in 
section 205(a)(3)(A) or (B) of the NDR Act (i.e., operation of a motor 
vehicle while under the influence of, or impaired by, alcohol or a 
controlled substance; and any traffic violations arising in connection 
with a fatal traffic accident, reckless driving, or racing on the 
highways). The Officer in Charge, Marine Inspection will not consider 
NDR listed civil convictions that are more than 3 years old from the 
date of request unless that information relates to the current 
suspension or revocation of the applicant's license to operate a motor 
vehicle. The Officer in Charge Marine Inspection may determine minimum 
and maximum assessment periods for NDR listed criminal convictions 
using Table 12.02-4(c). An applicant conducting simultaneous merchant 
mariner's credential transactions is subject to only one NDR check.
    (1) Any application may be disapproved if information from the NDR 
check leads the Officer in Charge, Marine Inspection to determine that 
the applicant cannot be entrusted with the duties and responsibilities 
of the merchant mariner's document for which the application is made. 
If an application is disapproved, the Officer in Charge, Marine 
Inspection will notify the applicant in writing of the reason(s) for 
disapproval and advise the applicant that the appeal procedures in 
Sec. 1.03 of this chapter apply. No examination will be given or 
merchant mariner's document issued pending decision on appeal.
    (2) Prior to disapproving an application because of information 
received from the NDR, the Officer in Charge, Marine Inspection will 
make the information available to the applicant for review and written 
comment. The applicant may submit reports from the applicable State 
concerning driving record and convictions to the Coast Guard Regional 
Examination Center (REC) processing the application. The REC will hold 
an application with NDR listed convictions pending the completion of 
the evaluation and delivery by the individual of the underlying State 
records.
    (3) The guidelines in Table 12.02-4(d) will be used by the Officer 
in Charge, Marine Inspection when evaluating applicants for merchant 
mariner's documents who have drug or alcohol related NDR listed 
convictions. Non-drug or alcohol related NDR listed convictions will be 
evaluated by the Officer in Charge, Marine Inspection under Table 
12.02-4(c) as applicable.
    (4) An applicant may request an NDR file check for personal use in 
accordance with the Federal Privacy Act of 1974 (Pub. L. 93-579) by 
contacting the NDR at the following address: National Driver Register, 
Nassif Building, 400 7th Street SW., Washington, DC 20590.
    (i) Applicants should request Form NDR-PRV or provide the following 
information on a notarized letter:
    (A) Full legal name;
    (B) Other names used;
    (C) Complete mailing address;
    (D) Driver license number;
    (E) Eye color;
    (F) Social security number;
    (G) Height;
    (H) Weight; and
    (I) Sex.
    (ii) The NDR will respond to every valid inquiry including requests 
which produce no record(s) on the NDR file. Records can be made 
available, within a reasonable amount of time after the request, for 
personal inspection and copying during regular working hours at 7:45 
a.m. to 4:15 p.m., each day except Federal holidays.

   Table 12.02-4(d).--Guidelines for Evaluating Applicants for Merchant Mariner's Documents Who Have NDR Motor  
                          Vehicle Convictions Involving Dangerous Drugs or Alcohol \1\                          
----------------------------------------------------------------------------------------------------------------
        No. of convictions                      Date of conviction                      Assessment period       
----------------------------------------------------------------------------------------------------------------
1................................  Less than 1 year...........................  1 year from date of conviction. 
1................................  More than 1, less than 3 years.............  Application will be processed,  
                                                                                 unless suspension, or          
                                                                                 revocation \2\ is still in     
                                                                                 effect. Applicant will be      
                                                                                 advised that additional        
                                                                                 conviction(s) may jeopardize   
                                                                                 merchant mariner credentials.  
1................................  More than 3 years old......................  Not necessary unless suspension 
                                                                                 or revocation is still in      
                                                                                 effect.                        
2 or more........................  Any less than 3 years old..................  1 year since last conviction and
                                                                                 at least 3 years from 2nd most 
                                                                                 recent conviction, unless      
                                                                                 suspension or revocation is    
                                                                                 still in effect.               
2 or more........................  All more than 3 years old..................  Application will be processed   
                                                                                 unless suspension or revocation
                                                                                 is still in effect.            
----------------------------------------------------------------------------------------------------------------
\1\ Any applicant who has ever been the user of, or addicted to the use of, a dangerous drug shall meet the     
  requirements of paragraph (a) of this section.                                                                
\2\ Suspension or revocation, when referred to in Table 12.02-4(d), means a State suspension or revocation of a 
  motor vehicle operator's license.                                                                             

    (e) If an applicant for an original merchant mariner's document has 
one or more alcohol or dangerous drug related criminal or NDR listed 
convictions; if the applicant has ever been the user of, or addicted to 
the use of, a dangerous drug; or if the applicant applies before the 
minimum assessment period for his or her conviction has elapsed; the 
Officer in Charge, Marine Inspection may consider the following 
factors, as applicable, in assessing the applicant's suitability to 
hold a merchant mariner's document. This list is intended as a 
guideline. The Officer in Charge, Marine Inspection may consider other 
factors which he or she judges appropriate, such as:
    (1) Proof of completion of an accredited alcohol- or drug-abuse 
rehabilitation program.
    (2) Active membership in a rehabilitation or counseling group, such 
as Alcoholics or Narcotics Anonymous.
    (3) Character references from persons who can attest to the 
applicant's sobriety, reliability, and suitability for employment in 
the merchant marine including parole or probation officers.
    (4) Steady employment.
    (5) Successful completion of all conditions of parole or probation.
    10. In Sec. 12.02-9, paragraphs (g) and (h) are added to read as 
follows:

Sec. 12.02-9  Application for documents.

* * * * *
    (g) Each applicant for an original merchant mariner's document may 
be required to submit to a criminal record check as required by 
Sec. 12.02-4(c).
    (h) Each applicant for an original merchant mariner's document or a 
merchant mariner's document reissued with a new expiration date shall 
comply 

[[Page 65490]]
with the NDR requirements in Sec. 12.02-4(d).
    Dated: December 12, 1995.
G.N. Naccara,
Captain, U.S. Coast Guard, Acting Chief, Office of Marine Safety, 
Security and Environmental Protection.
[FR Doc. 95-30677 Filed 12-18-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-30668 Interim Rule Amending International Mail Manual Subchapter 790, Items Mailed Abroad by or on Behalf of Senders in the U.S. and Certain Other Countries
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65238-65240]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30668]

=======================================================================
-----------------------------------------------------------------------

POSTAL SERVICE

39 CFR Part 20

Interim Rule Amending International Mail Manual Subchapter 790, 
Items Mailed Abroad by or on Behalf of Senders in the U.S. and Certain 
Other Countries

AGENCY: Postal Service.

ACTION: Interim rule.

-----------------------------------------------------------------------

SUMMARY: On March 10, 1994, the Postal Service published in the Federal 
Register (59 FR 11188-11193) amendments to certain rules in 
International Mail Manual (IMM) subchapter 790 to clarify when a 
mailing in a foreign country is by or on behalf of a resident of the 
United States for the purposes of collecting U.S. domestic postage; and 
to authorize the collection of U.S. domestic postage on certain mail 
posted in a foreign country by or on behalf of a person who is not a 
resident of that foreign country. This document amends IMM subchapter 
790 to remove the threshold of 1,000 pieces mailed abroad in a 30-day 
period by a U.S. resident and to remove the standards relative to the 
collection of U.S. domestic postage on ``A-B-C remail''.The basis for 
the amended rules is contained in article 25, Posting Abroad of Letter-
Post Items, of the Universal Postal Convention (Washington, 1989).

DATES: The interim rule is effective January 1, 1996. Comments must be 
received on or before January 18, 1996.

ADDRESSES: Written comments should be mailed or delivered to the 
Manager, 

[[Page 65239]]
International Pricing, U.S. Postal Service, 475 L'Enfant Plaza SW RM 
4400-EB, Washington, DC 20260-6500. Copies of all written comments will 
be available at the above address for public inspection and 
photocopying between 9 a.m. and 4 p.m., Monday through Friday.

FOR FURTHER INFORMATION CONTACT: John F. Alepa, (202) 268-4071.

SUPPLEMENTARY INFORMATION: In 1994, the Universal Postal Union (UPU) 
met in Congress in Seoul, Korea, to amend and adopt the Acts of the 
Universal Postal Union. The Acts come into force on January 1, 1996. 
The United States is a member of the UPU. By virtue of that membership, 
the U.S. Postal Service must adhere to the Agreements of the UPU to 
which it is a signatory.
    The UPU adopted revisions to the Acts of the Universal Postal 
Union, including article 25 of the Universal Postal Convention. Article 
25 no longer contains a provision permitting the Postal Service to 
collect U.S. domestic postage from a resident of the United States when 
mailings made abroad for that resident exceed 1,000 pieces in a 30-day 
period without regard to whether the postage paid in the foreign 
country is less than the applicable U.S. domestic postage. In addition, 
article 25 no longer grants authority to the Postal Service to collect 
U.S. domestic postage for items for delivery in the United States from 
a mailer who posts, or causes to be posted, such items in a country 
other than the country of that mailer's residence. Rather, any charge 
will be due from the dispatching postal administration.
    As a result of the revisions to article 25, the Postal Service is 
amending IMM subchapter 790 to remove the threshold of 1,000 pieces 
mailed abroad in a 30-day period by a U.S. resident and to remove the 
standards relative to the collection of U.S. domestic postage on ``A-B-
C remail'' (that is, a method of mailing in which a person or firm 
mails from a country other than the one of which it is a resident to a 
third country in order to benefit from lower international postage 
rates in the country of mailing).
    Specifically, the 1994 Congress amended article 25, Posting Abroad 
of Letter-Post Items, which contains four paragraphs. Paragraphs 1 
through 3 relate to items mailed from abroad back into the country of 
residence of the sender. Paragraph 4 relates to items mailed by 
residents of one country from a second country for delivery in a third 
country. This method of mailing (as discussed above) is commonly 
referred to as ``A-B-C remail.''
    Paragraph 1 was amended to remove the provision that permitted 
postal administrations to invoke action against a person or firm 
mailing to that person's or firm's country of residence from another 
country solely on the basis of the number of items mailed. Article 25, 
paragraph 1, requires that the mailing be made ``with the object of 
profiting by more favorable rate conditions there.'' To comply with 
this revision, the Postal Service is removing from IMM subchapter 790 
the provision that provides that applicable U.S. domestic postage is 
due when ``1,000 or more such items are mailed in a 30-day period 
regardless of whether the foreign postage is lower than the comparable 
U.S. postage.''
    Paragraph 4 regulates ``A-B-C remail.'' This method of mailing 
occurs when a resident of country A mails from country B mail 
destinating in country C. This method is generally economically 
feasible because of differences in the terminal dues system provided by 
the Universal Postal Convention. Most developing countries (which 
generally originate small volumes of outgoing international mail) are 
assigned a lower terminal dues rate than developed countries (which 
generally originate large volumes of outgoing international mail).
    Under the current terminal dues system, for example, two countries 
each annually exchanging more than 150 tons of mail would pay terminal 
dues equivalent to 25 cents for a \1/2\-ounce item. By contrast, two 
countries each annually exchanging 150 tons or less of mail would pay 
terminal dues equivalent to only 6 cents for the same \1/2\-ounce item.
    When ``A-B-C remail'' is used, that mailing method harms both 
country A (because it loses revenue and mail volume) and country C 
(because it receives less in terminal dues from country B than it would 
receive from country A). This lower rate of terminal dues generally 
does not compensate the delivering country for the actual cost of 
handling such mail.
    To correct this situation, the 1994 Universal Postal Congress 
adopted a new terminal dues system and introduced a separate rate for 
``bulk mail,'' regardless of where that mail originates. The delivering 
country will be able to collect the same rate in terminal dues without 
regard to the country originating the mail. This revised system should 
reduce considerably the volume of mail migrating from developed 
countries to developing countries solely to take advantage of lower 
international rates made possible from different terminal dues rates.
    In some cases, the 1994 Congress recognized that even this ``bulk 
mail'' rate of terminal dues would not provide full compensation to the 
delivering postal administration and that migration of mail might 
continue. Accordingly, article 25, paragraph 4, allows the delivering 
postal administration to collect the equivalent of ``bulk mail'' 
terminal dues from the dispatching postal administration if the 
delivering administration is not receiving appropriate remuneration. 
However, the delivering administration will no longer be able to 
collect extra compensation from the sender of the items. Remuneration 
is strictly between the dispatching and delivering postal 
administrations. Therefore, the Postal Service is eliminating its rules 
in IMM subchapter 790 concerning the collection of U.S. domestic 
postage from the sender of so-called ``A-B-C remail.''
    Although 39 U.S.C. 407 does not require advance notice and 
opportunity for submission of comments, and the Postal Service is 
exempted by 39 U.S.C. 410(a) from the advance notice requirements of 
the Administrative Procedure Act regarding rulemaking (5 U.S.C. 553), 
the Postal Service invites public comment.
    The Postal Service adopts on an interim basis, pending receipt and 
consideration of public comment, the following amendments to subchapter 
790 of the International Mail Manual, which is incorporated by 
reference in the Code of Federal Regulations. See 39 CFR 20.1.

List of Subjects in 39 CFR Part 20

    Foreign relations, Incorporation by reference, International postal 
services.

PART 20--[AMENDED]

    1. The authority citation for 39 CFR part 20 continues to read as 
follows:

    Authority: 5 U.S.C. 552(a); 39 U.S.C. 401, 404, 407, 408.

    2. The International Mail Manual is amended by revising subchapter 
790, Items Mailed Abroad by or on Behalf of Senders in the U.S. and 
Certain Other Countries, to read as follows:

790  Items Mailed Abroad by or on Behalf of Senders in the United 
States

791  Postage Payment Required

    Payment of U.S. postage is required to secure delivery of mail when 
the mailing is by or on behalf of a person or firm that is a resident 
of the United States and the foreign postage rate applied to such items 
is lower than the comparable U.S. domestic postage rate. 

[[Page 65240]]

792  Definition of Terms

792.1  Resident

    A resident of the United States includes any firm that has a place 
of business in the United States or is incorporated or otherwise 
organized in the United States, its territories, or its possessions.

792.2  By or on Behalf

    A mailing is made by or on behalf of a person or firm that is a 
resident of the United States if such a resident seeks or expects to 
derive economic benefit or advantage from that mailing.

792.3  Place of Business

    A place of business in the United States is any location in the 
United States, its territories, or its possessions where a firm's 
employees or agents regularly have personal contact with other 
individuals for conducting the firm's business. For the purposes of 
this section, a firm whose employees or agents have personal contact 
with others for conducting the firm's business in different places in 
the United States for short periods (for example, at hotels in 
different cities for 1 or 2 days at a time) is considered to have a 
place of business in the United States if the aggregate amount of time 
spent in the United States is 180 days or more within 12 consecutive 
months.

792.4  Agent

    The use of a nonexclusive agent in the United States for the sole 
purpose of accepting orders and remissions for transmission to a firm 
in another country or for the sole purpose of distributing merchandise 
manufactured in another country and shipped to the United States in 
bulk does not by itself establish a place of business in the United 
States.

793  Advance Payment Required

793.1  Sample Mailpiece

    A sender affected by the provisions in 791 must submit a sample 
mailpiece (envelope and contents) from the proposed mailing; a 
statement about the number of items to be mailed, the date of mailing, 
and the place of mailing; and a check, made payable to the U.S. Postal 
Service, to cover the amount of the applicable U.S. postage. The sample 
mailpiece, statement, and check must be sent to: Manager, International 
Pricing, U.S. Postal Service, 475 L'Enfant Plz. SW., Washington, DC 
20260-6500.

793.2  Headquarters Notification

    Headquarters provides notification of postage acceptance and 
approval of the mailing to the sender and to the receiving U.S. 
exchange office. This notification permits the items in the mailing to 
go forward to the addressees without delay when the items reach the 
United States.

794  Advance Payment Not Made

794.1  Return or Disposal of Items

    Items may be returned to origin or disposed of in accordance with 
postal regulations if U.S. postage is not paid.

794.2  Mailings Without Advance Payment

    A mailing subject to the provisions in 791 received without advance 
payment of U.S. domestic postage is held at the receiving U.S. exchange 
office. The exchange office reports the mailing to the manager of 
International Pricing, USPS Headquarters. (The exchange office is 
advised to release the mail when the applicable postage is paid.) The 
report must contain the following information:
    a. Title and/or nature of the items.
    b. Identity of the sender.
    c. Number of items detained.
    d. Weight of a single item.
    e. Foreign postage paid per item.
    f. Country of mailing.

795  Report of Mailings

    The receiving U.S. exchange office must report any mail appearing 
to be subject to the provisions of this subchapter to the manager of 
International Pricing, USPS Headquarters.
Stanley F. Mires,
Chief Counsel, Legislative.
[FR Doc. 95-30668 Filed 12-18-95; 8:45 am]
BILLING CODE 7710-12-P

Complete official Federal Register PDF

FR Doc. 95-30665 Fracture Toughness Requirements for Light Water Reactor Pressure Vessels
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65456-65476]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30665]

[[Page 65455]]

_______________________________________________________________________

Part IV

Nuclear Regulatory Commission

_______________________________________________________________________

10 CFR Part 50

Fracture Toughness Requirements for Light Water Reactor Pressure 
Vessels; Final Rule

Federal Register / Vol. 60, No. 243 / Tuesday, December 19, 1995 / 
Rules and Regulations
=======================================================================
-----------------------------------------------------------------------

[[Page 65456]]

NUCLEAR REGULATORY COMMISSION

10 CFR Part 50

RIN 3150-AD57

Fracture Toughness Requirements for Light Water Reactor Pressure 
Vessels

AGENCY: Nuclear Regulatory Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Nuclear Regulatory Commission (NRC) is amending its 
regulations for light-water-cooled nuclear power plants to clarify 
several items related to the fracture toughness requirements for 
reactor pressure vessels (RPV). The amendments will clarify the 
pressurized thermal shock (PTS) requirements, make changes to the 
Fracture Toughness Requirements and the Reactor Vessel Material 
Surveillance Program Requirements, and provide new requirements for 
thermal annealing of a reactor pressure vessel.

EFFECTIVE DATE: January 18, 1996.

FOR FURTHER INFORMATION CONTACT: Alfred Taboada, Division of 
Engineering Technology, Office of Nuclear Regulatory Research, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-00001, telephone: 
(301) 415-6014.

SUPPLEMENTARY INFORMATION: On October 4, 1994 (59 FR 50513), the NRC 
published in the Federal Register a proposed amendment to clarify 
several items related to fracture toughness requirements for reactor 
pressure vessels (RPV) and to add a new section on thermal annealing of 
a reactor vessel to 10 CFR Part 50.

Background

    Maintaining the structural integrity of the reactor pressure vessel 
of light-water-cooled reactors is a critical concern related to the 
safe operation of nuclear power plants. To assure the structural 
integrity of RPVs, NRC regulations and regulatory guides have been 
developed to provide analysis and measurements methods and procedures 
to establish that each RPV has adequate safety margin for continued 
operation. Structural integrity of a RPV is generally assured through a 
fracture mechanics evaluation, including measurement or estimation of 
the fracture toughness of the materials which compose the RPV. However, 
the fracture toughness of the RPV materials varies with time. As the 
plant operates, neutrons escaping from the reactor core impact the 
vessel beltline materials (e.g. the materials that surround the reactor 
core), causing embrittlement of those materials. The NRC's regulations 
and regulatory guides related to RPV integrity provide the criteria and 
methods needed to estimate the extent of the embrittlement, to evaluate 
the consequences of the embrittlement in terms of the structural 
integrity of the RPV, and to provide methods to mitigate the 
deleterious effects of the embrittlement.
    The NRC has several regulations and regulatory guides that 
establish criteria and procedures for assuring the structural integrity 
of RPVs. With the addition of the thermal annealing requirements in 
this rule and several regulatory guides, the regulatory documents 
contribute to a comprehensive set of regulations and regulatory 
guidance pertaining to RPV integrity.
    This final rule adds requirements for thermal annealing of the RPV 
as a method for mitigating the effects of neutron irradiation (10 CFR 
50.66) and amends the following:
    1. The Pressurized Thermal Shock (PTS) rule (10 CFR 50.61).
    2. Appendix G of 10 CFR Part 50, ``Fracture Toughness 
Requirements.''
    3. Appendix H of 10 CFR Part 50, ``Reactor Vessel Material 
Surveillance Program Requirements.''

Overview of the Final Rule

PTS Rule (10 CFR 50.61)

    This amendment to the PTS rule makes three changes:
    1. The rule incorporates in total, and therefore makes binding by 
rule, the method for determining the reference temperature, RTNDT, 
including treatment of the unirradiated RTNDT value, the margin 
term, and the explicit definition of ``credible'' surveillance data, 
which is currently described in Regulatory Guide 1.99, Revision 2.
    2. The section is restructured to improve clarity, with the 
requirements section giving only the requirements for the value for the 
reference temperature for end of life fluence, RTPTS. The method 
for calculating RTPTS is moved to a new paragraph of the rule.
    3. Thermal annealing is identified as a method for mitigating the 
effects of neutron irradiation, thereby reducing RTPTS.

Thermal Annealing Rule (10 CFR 50.66)

    The thermal annealing rule, 10 CFR 50.66, provides a consistent set 
of requirements for the use of thermal annealing to mitigate the 
effects of neutron irradiation and replaces the requirements for 
annealing in the current Appendix G of 10 CFR Part 50. The final rule 
requires, prior to initiation of thermal annealing, submittal of a 
Thermal Annealing Report containing: (1) A Thermal Annealing Operating 
Plan, (2) a Requalification Inspection and Test Program, (3) a Fracture 
Toughness Recovery and Reembrittlement Trend Assurance Program, and (4) 
Identification of Unreviewed Safety Questions and Technical 
Specifications Changes. The report must be submitted at least 3 years 
before the date at which the limiting fracture toughness criteria in 
50.61 and Appendix G to Part 50 would be exceeded. This 3-year period 
is specified to provide the NRC staff with sufficient time to review 
the thermal annealing program. Under Sec. 50.66(a), the NRC will, 
within three years of submission of a licensee's Thermal Annealing 
Report, document its views on the plan, including whether thermal 
annealing constitutes an unreviewed safety question.
    In order to provide for public participation in the regulatory 
process, Section 50.66(f)(1) requires that the NRC hold a public 
meeting a minimum of 30 days before the licensee starts to thermal 
anneal the reactor vessel. The Commission will notify and solicit 
comments from cognizant local and state governments, and will publish a 
notice in the Federal Register and in a forum, such as local 
newspapers, which is readily accessible to individuals in the vicinity 
of the site, in order to solicit comments from the public.
    The thermal annealing operating plan must include an evaluation of 
the effects of temperature, and of mechanical and thermal stresses on 
the reactor and associated equipment such as containment, the 
biological shield, and attached piping, to demonstrate that the 
operability of the reactor will not be detrimentally affected. The 
bounding conditions of the temperatures and times used in this analysis 
define the proposed annealing conditions. If these conditions are 
exceeded during the vessel annealing, then the evaluation would no 
longer be valid, and the acceptability of the actual vessel annealing 
would have to be demonstrated as discussed below in the next paragraph.
    Upon completion of the thermal annealing, the licensee must confirm 
in writing to the Director, Office of Nuclear Reactor Regulation (NRR), 
that the thermal annealing was performed in accordance with the Thermal 
Annealing Operating Plan and the Requalification Inspection and Test 
Program. Within 15 days of the licensee's written confirmation that the 
thermal annealing was completed in accordance with the 

[[Page 65457]]
Thermal Annealing Plan, and prior to restart, the NRC shall: (1) 
Briefly document whether the thermal annealing was performed in 
compliance with the licensee's Thermal Annealing Operating Plan and the 
Requalification Inspection and Test Program, with the documentation to 
be placed in the NRC public document room, and (2) hold a public 
meeting to: (1) permit the licensee to explain the results of the 
reactor vessel annealing to the NRC and the public, (2) allow the NRC 
to discuss its inspection of the reactor vessel annealing, and (3) 
provide an opportunity for the public to comment to the NRC on the 
thermal annealing. The licensee may restart its reactor after the 
meeting has been completed, unless the NRC orders otherwise. Within 45 
days of the licensee's written confirmation that the thermal annealing 
was completed in accordance with the Thermal Annealing Operating plan 
and the Requalification Inspection and Test Program, the NRC staff 
shall complete full documentation of the NRC's inspection of the 
licensee's annealing process and place the documentation in the Public 
Document Room.
    If the thermal annealing was completed but not performed in 
accordance with the Thermal Annealing Operating Plan and the 
Requalification Inspection and Test Program, including the bounding 
conditions of the temperature and times as discussed above, the 
licensee must submit a summary of lack of compliance and a 
justification for subsequent operations. The licensee must also 
identify any changes to the facility which are attributable to the 
noncompliances which constitute unreviewed safety questions and any 
changes to the technical specifications which are required for 
operation as a result of the noncompliances. This identification does 
not relieve the licensee from complying with applicable requirements of 
the Commission regulations and the operating license, and if, as a 
result of the annealing operation, these requirements cannot be met, 
the licensee must obtain the appropriate exemption per 10 CFR 50.12. If 
unreviewed safety questions or changes to technical specifications are 
not identified as necessary for resumed operation, the licensee may 
restart after the NRC staff places a summary of its inspection of the 
thermal annealing in the Public Document Room, and the NRC holds a 
public meeting on the thermal annealing. On the other hand, if 
unreviewed safety questions or changes to technical specifications are 
identified as necessary for resumed operation, the licensee may restart 
only after the Director of NRR authorizes restart, the summary of the 
NRC staff inspection is placed in the public document room, and a 
public meeting on the thermal annealing is held.
    The final Thermal Annealing Rule also sets forth the requirements 
that a licensee must follow if the thermal annealing was terminated 
prior to completion. In general, the process and requirements for 
partial annealing are analogous to the situations where the thermal 
annealing was completed; viz., where the partial annealing was 
otherwise performed in compliance with the Thermal Annealing Operating 
Plan and relevant portions of the Requalification Inspection and Test 
Program, the licensee submits written confirmation of such compliance 
and may restart following, inter alia, holding of a public meeting on 
the annealing. By contrast, where the partial annealing was not 
performed in accordance with the Thermal Annealing Operating Plan and 
relevant portions of the Requalification Inspection and Test Program, 
the licensee is required to submit a summary of lack of compliance and 
a justification for subsequent operations, and identify any changes to 
the facility which are attributable to the noncompliances which 
constitute unreviewed safety questions and changes to the technical 
specifications which are required for operation as a result of the 
noncompliances with the Thermal Annealing Operating Plan and relevant 
portions of the Requalification Inspection and Test Program. If 
Unreviewed Safety Questions and/or changes to technical specifications 
are identified as necessary for resumed operation, the licensee may 
restart only after the Director of NRR authorizes restart and the 
public meeting on the thermal annealing is held.
    Every licensee that either completes a thermal annealing or 
terminates an annealing but elects to take full or partial credit for 
the annealing shall provide a Thermal Annealing Results Report 
detailing: (1) The time and temperature profile of the actual thermal 
anneal, (2) the post-anneal RTNDT and Charpy upper shelf energy 
values of the reactor material to be used in subsequent operations, (3) 
the projected post-anneal reembrittlement trends for both RTNDT 
and Charpy upper-shelf energy, and (4) the projected values of 
RTPTS and Charpy upper-shelf energy at the end of the proposed 
period of operation addressed in the application. The report must be 
submitted within three months of completing the thermal anneal, unless 
an extension is authorized by the Director, NRR.
    Two items of particular importance to the overall annealing are the 
recovery of fracture toughness and the degree of reembrittlement of the 
RPV beltline materials. This final rule provides alternative methods 
for determining these values, ranging from assessments using plant-
specific materials to an assessment using a generic computation.
    Two methods provided for evaluating annealing recovery are 
experimental methods to determine plant-specific annealing recovery, 
and a third method is a generic computational method. Experimental 
methods and the computational method are also provided for estimating 
recovery of RTNDT and Charpy upper-shelf energy of the beltline 
materials. The experimental methods for estimating recovery of 
RTNDT and the Charpy upper-shelf energy utilize either 
surveillance program specimens or material removed from the vessel 
beltline. The experimental methods provide a plant-specific estimate of 
recovery, rather than the generic value evaluated from the 
computational method. This final rule requires that surveillance 
specimens from ``credible'' surveillance programs must be used to 
develop plant-specific recovery data, if such specimens are available. 
This final rule does not require the removal of material from the RPV 
beltline to permit plant-specific evaluation of recovery.
    As described previously, the computational method requires 
appropriate justification.
    Post anneal reembrittlement trends of both the RTNDT and the 
Charpy upper shelf energy must be estimated and monitored using a 
surveillance program described in the Thermal Annealing Report.
    The reactor pressure vessel is perhaps the most important single 
component in the reactor coolant system. As such, ensuring its 
integrity is a fundamental element of plant safety. Thermal annealing 
is a positive action that could be taken to reduce the level of 
embrittlement in the pressure vessel beltline and, thereby, improve the 
ability of a pressure vessel to withstand accident loadings. While 
thermal annealing is a positive action, there are numerous complex 
technical questions regarding its application in the U.S. that are 
unanswered.
    Thermal annealing of a commercial reactor pressure vessel has never 
been accomplished in the United States. Thermal annealing has been 
successfully employed in Eastern Europe and Russia on Russian-designed 
pressure vessels. However, there are significant differences between 
the U.S. and Russian designs in terms of the 

[[Page 65458]]
geometry of the pressure vessels, the attached piping, and the 
surrounding structures. The staff has observed one of these annealing 
operations. While informative, the East European and Russian experience 
does not provide answers to all of the potential questions related to 
annealing of U.S. designed pressure vessels.
    Research analyses performed previously indicated the potential for 
plastic deformation of the main coolant piping for a typical U.S. plant 
design and anticipated annealing conditions. There are also questions 
regarding how thermal growth of the pressure vessel is treated, and the 
adequacy of the thermal and stress analyses used to predict response of 
the overall system under thermal annealing conditions. Additionally, 
there may be questions in other areas such as temperature limits for 
the concrete structures, and potential radiological hazards associated 
with removing and storing the reactor internals during the annealing 
process, and fire hazards associated with heating the vessel.
    Recognition of the numerous complex technical questions related to 
thermal annealing, and of the potential benefits for operating nuclear 
power plants, has resulted in a cooperative effort, funded by the U.S. 
Department of Energy and the industry, to perform Annealing 
Demonstration Projects. Projects are planned to demonstrate two 
different annealing processes, evaluating heater designs and vessel 
designs. It is anticipated that the annealing demonstration projects 
will answer many of the generic questions regarding thermal annealing 
of U.S. pressure vessel and piping designs.
    The thermal annealing report, required by the thermal annealing 
rule, is designed to facilitate a detailed review by the licensee of 
plant-specific questions and considerations in performing a thermal 
annealing. The proposed rule specifically discusses the potential for 
unreviewed safety questions and technical specification changes that 
may result from or be related to thermal annealing of the reactor 
pressure vessel. With completion of the demonstration projects and as 
the staff and industry gain experience with thermal annealing, many of 
the issues related to annealing will be better understood and related 
questions will be answered. However, until this experience is realized, 
the staff will critically review licensee determinations regarding 
unreviewed safety questions and the need for technical specification 
changes associated with each proposed thermal annealing.
    The thermal annealing rule has been structured to provide time for 
the staff to thoroughly review the licensee's annealing plan and 
determination regarding unreviewed safety questions and the need for 
technical specification changes. If the staff identifies an unreviewed 
safety question or the need for a technical specification change, the 
licensee would be so notified and the existing NRC regulatory practices 
would be invoked to address the issues.

Appendix G of 10 CFR Part 50

    Appendix G of 10 CFR Part 50 specifies fracture toughness 
requirements for ferritic materials of pressure-retaining components of 
the reactor coolant pressure boundary of light-water-cooled nuclear 
power reactors. These requirements provide adequate margins of safety 
during any condition of normal operation, including anticipated 
operational occurrences and system hydrostatic tests. The amendments to 
Appendix G are principally of a clarifying or a restructuring nature. 
Requirements for ``volumetric inspection'' and ``additional evidence of 
fracture toughness'' have been removed because they were unnecessary, 
given the inspection and performance demonstration programs currently 
required under 10 CFR 50.55a. The ``additional evidence of fracture 
toughness'' requirement in Section V.C.2 is incorporated in the 
``equivalent margins'' analysis in Section IV.A.1 as a provisional 
method for developing fracture toughness data needed for that analysis.
    The pressure-temperature and minimum permissible temperature 
requirements in Section IV have been restructured. The principal 
feature is the addition of a table which summarizes the pressure-
temperature limit requirements and minimum temperature requirements as 
a function of the plant operating condition, the vessel pressure, 
whether fuel is in the vessel, and whether the core is critical. In 
addition, Section IV has been reworded to clarify the minimum 
permissible temperature requirement by indicating the criteria for use 
in determining the location in the component or material which must 
satisfy the minimum temperature requirement. This minimum temperature 
is defined in Section IV as the metal temperature of the controlling 
material in the region which has the least favorable combination of 
stress and temperature for the appropriate plant condition. An explicit 
statement has been added to require that pressure and leak tests of the 
reactor pressure vessel required by Section XI of the American Society 
of Mechanical Engineers Boiler & Pressure Vessel (B&PV) Code (ASME 
Code) must be completed before the core is critical.
    The requirement that all pressure and leak tests of the RPV 
required by Section XI of the ASME Code must be completed before the 
core is critical is intended to prohibit the use of nuclear heat, i.e., 
core criticality, in the conduct of ASME, Section XI pressure and leak 
tests. The use of nuclear heat before the completion of such tests is 
not consistent with basic defense-in-depth nuclear safety principle for 
several reasons, including the hindrance of finding leaks with the 
vessel at such a high temperature and the potential for exacerbating 
the consequences of a vessel rupture (in the extremely unlikely event 
that it should occur) by having the core critical. The explicit 
prohibition of nuclear heat in these cases was discussed in a letter to 
Messrs. Reynolds and Stenger of the Nuclear Utility Backfitting and 
Reform Group from James M. Taylor, Executive Director of Operations, 
dated February 2, 1990.
    The current requirements in 10 CFR Part 50, Appendix G, Section V. 
D. with respect to reactor vessel thermal annealing are being replaced 
by a sentence which references the new Thermal Annealing rule, 10 CFR 
50.66.

Appendix H of 10 CFR Part 50

    Appendix H of 10 CFR Part 50, ``Reactor Vessel Material 
Surveillance Program Requirements'' provides the rules for monitoring 
the changes in the fracture toughness properties of the RPV beltline 
materials due to irradiation embrittlement using a surveillance 
program. Appendix H references American Society for Testing and 
Materials (ASTM) standard E 185 (``Standard Practice for Conducting 
Surveillance Tests for Light-Water Cooled Nuclear Power Reactor 
Vessels'') for many of the detailed requirements of surveillance 
programs, and permits the use of integrated surveillance programs, 
wherein surveillance program capsules for one reactor are irradiated in 
another reactor.
    Integrated surveillance programs are permitted under Section II.C 
of Appendix H of 10 CFR Part 50. One provision of this section is that 
``the amount of testing may be reduced if the initial results agree 
with predictions.'' This provision was deleted, although previous 
authorizations granted by the Director, Office of Nuclear Reactor 
Regulation, continue in effect.
    A second change to Appendix H restructures Section II.C to clarify 
the 

[[Page 65459]]
requirements for integrated surveillance programs.
    The other principal change to Appendix H clarifies the version of 
ASTM Standard E 185 that applies to the various portions of the 
surveillance programs. Appendix H recognizes the need to separate 
surveillance programs into two essential parts, specifically the design 
of the program and the subsequent testing and reporting of results from 
the surveillance capsules. Because the design of the surveillance 
program cannot be changed once the program is in place, the 
requirements for design of the surveillance program are static for each 
plant. However, the testing and reporting requirements are updated 
along with technical improvements made to ASTM standard E 185.

Request for Public Comments

    At the request of the Commission, the proposed rule contained a 
request for public comments on the following specific issues related to 
the proposed regulation on thermal annealing:
    1. The technical adequacy of the staff's guidance;
    2. The sufficiency of the guidance and criteria to support a 
certification that if satisfied, a plant with an annealed vessel can 
safely resume operation;
    3. Whether health and safety concerns are best served by approval 
of the thermal annealing plan or of readiness for restart;
    4. The preferred regulatory process (including opportunities for 
public participation) and the commenter's basis for recommending a 
particular process; and
    5. Whether there are health and safety issues concerning thermal 
annealing that cannot be addressed generically and would warrant plant-
specific consideration.
    The supplementary information section of the proposed rule also 
discussed the issue of opportunity for public participation in 
regulating thermal annealing of pressure vessels.
    The response to the request for public comments on these issues, 
along with other items, are summarized below.

Summary of Comments

    The following includes a summary of the comments received on the 
proposed rule, on the five issues identified by the Commission, and on 
the options for public participation in thermal annealing.
    Comments were received from nine separate sources. These sources 
consist of five utilities, the Nuclear Energy Institute (NEI), the 
Nuclear Utility Backfitting and Reform Group (NUBARG) represented by 
the firm Winston & Strawn, one public citizens group (Ohio Citizens for 
Responsible Energy (OCRE)), and one nuclear steam system supplier 
(NSSS).
    NEI provided detailed comments on 10 CFR 50.61, 10 CFR 50.66, 
Appendix G to 10 CFR Part 50, and Appendix H to 10 CFR Part 50, 
responded to the request for comments on the five issues related to 
thermal annealing and included detailed comments on the opportunities 
for public participation. The five utilities and the NSSS endorsed the 
NEI comments. Three of the five utilities provided additional comments 
on 10 CFR 50.61; one of the five utilities provided additional comments 
on 10 CFR Part 50, Appendix G; two of the utilities provided additional 
comments on 10 CFR Part 50, Appendix H; and one of the five utilities 
disagreed with the NEI position on the opportunity for public 
participation and submitted a separate comment. OCRE provided comments 
on the opportunity for public participation. NUBARG provided comments 
on the backfitting aspects of the proposed rule and the staff's backfit 
justification.
    NEI and one of the utilities included comments on the Draft 
Regulatory Guide DG-1027, ``Format and Content of Application for 
Approval for Thermal Annealing of Reactor Pressure Vessels,'' that was 
discussed in the proposed rule. These comments on Draft Regulatory 
Guide DG-1027 are being reviewed by the NRC staff and will be addressed 
separately in the resolution of comments on the regulatory guide.
    The NRC reviewed the comments received on the proposed rule, the 
comments on the five questions related to thermal annealing and the 
issue of opportunities for public participation. The resolution of 
these comments is presented below.

PTS Rule (10 CFR 50.61)

    Sixteen specific comments in the submittals from NEI and three 
utilities addressed 10 CFR 50.61. A general comment argued that both 
the existing 10 CFR 50.61 and the proposed modifications contained an 
excessive amount of prescriptive technical detail that limits licensee 
compliance flexibility. The commenters proposed that these prescriptive 
technical details be removed from the rule and placed in a regulatory 
guide. These commenters suggested that the rule not be issued until it 
has been written to contain only those requirements essential to 
regulate reactor pressure vessel embrittlement. A number of comments 
suggested changes that were clarifications to the proposed rule, 
including proposals to clarify the procedure for calculating the 
reference temperatures in the preservice condition, RTNDT, and, at 
end of reactor life, RTPTS. One comment noted that the proposed 
rule omitted part of the procedure in Regulatory Guide 1.99, presently 
being applied by the NRC, that permits adjustments for differences in 
chemistry between surveillance material and the vessel material when 
using credible surveillance data to calculate a best fit chemistry 
factor for transition temperature shifts due to irradiation. Several 
comments proposed changes in the criteria for establishing whether 
surveillance material data is credible that would result in a less 
restrictive basis for using surveillance data in determining the 
transition temperature shift. The comments argued that the proposed 
rule is ambiguous with respect to the use of information from other 
sources that contain limiting material for a specific plant and that 
the NRC must have the flexibility to approve use of such information on 
a case-by-case basis. Several comments proposed limiting the basis for 
making changes of RTPTS subject to the approval of the Director, 
NRR.
    The NRC recognizes that 10 CFR 50.61 contains an unusual amount of 
prescriptive material and that the comments proposing simplification 
have merit. Some changes to the rule have been made to provide 
flexibility, where appropriate. The NRC staff is evaluating subsequent 
changes that would be more performance based. However, the NRC staff 
believes that this rule, as written, is needed to ensure that plants 
apply the appropriate method for determining RTPTS and that the 
appropriate reference to the thermal annealing rule be applied for the 
pressurized thermal shock situation.
    A number of clarifications were made to the rule. The paragraphs 
dealing with the determination of RTPTS were modified to make 
clear that RTPTS is a unique, end of life, case of RTNDT and 
to clarify the procedure for determining these values. As suggested, 
the adjustment procedure was added to the rule to permit accounting for 
differences in chemistry between surveillance materials and reactor 
vessel materials when calculating chemistry factors. With respect to 
the plant specific material surveillance data that is permitted to be 
used in a surveillance program, the rule was modified to make clear 
that such data includes results from other plant's surveillance 
programs and test reactors. Several clarifications were made to the 
criteria for determining credible material. The NRC determined that the 
requirements for approval by the Director, NRR, for 

[[Page 65460]]
changes in RTPTS are appropriate and should not be modified.

Thermal Annealing Rule (10 CFR 50.66)

    Twelve individual comments were received on the proposed Thermal 
Annealing Rule, 10 CFR 50.66. These comments included a number of 
suggestions for clarification of details of the proposed rule. Three of 
the comments addressed the requirements that, after the annealing 
operation, the reembrittlement rate of the reactor vessel due to 
neutron irradiation must be estimated and must be monitored using a 
surveillance program which conforms to Appendix H of 10 CFR 50, 
``Reactor Vessel Materials Surveillance Program.'' The comments are 
summarized as follows:
    (1) The supplementary information section for the proposed rule is 
silent on what is acceptable if limiting material is not available. The 
rule should provide appropriate requirements on the method for 
monitoring reembrittlement after annealing for those plants that do not 
have limiting material for their surveillance program and the 
monitoring plans should be consistent with the preannealing 
surveillance program approved by the NRC staff;
    (2) Appendix H does not define an acceptable post-anneal 
surveillance program, the reference to Appendix H should be deleted, 
and the post-anneal surveillance program should be defined in the 
annealing plan that is approved by the staff; and
    (3) The term reembrittlement rate is unclear as to the period of 
time to be used for its determination, and a wording change is proposed 
for the requirement that would relate change in toughness to fluence 
accumulated after the anneal.
    Three of the comments addressed the requirements in the proposed 
rule that the Thermal Annealing Operation Plan include time-temperature 
profiles which represent the annealing conditions that may not be 
exceeded during the annealing operation and are to be used for 
determining the amount of recovery of the fracture toughness of the 
material due to annealing. The comments suggested that, instead of a 
single time-temperature profile, bounding time and temperature 
conditions be established for the maximum values that would be used for 
thermal and stress analysis and to verify the re-qualification 
inspection and test program, and the minimum values that would be used 
to establish the amount of recovery of fracture toughness and for 
reembrittlement rate estimates. The bounding values would be based upon 
the estimated uncertainties in the times and temperatures and the 
actual annealing conditions should fall within these bounds.
    Two comments addressed the section on Certification of Annealing 
Effectiveness. One comment suggested deleting the requirement in the 
proposed rule for certification of the annealing effectiveness and 
instead adding a provision in the Thermal Annealing Operating Plan that 
approval prior to subsequent power operation be required only if the 
anneal was not performed in accordance with the approved plan. The 
comment also suggested that, if the licensee terminates the annealing 
before achieving the specified time but otherwise maintains the 
annealing envelop such that no concern exists for stress or thermal 
damage, no additional constraints be imposed on subsequent operations 
and no credit be given for annealing. The second comment suggested that 
(1) the staff's review of the annealing report (certification report) 
need not be completed prior to reinitiating power operation if the 
anneal was performed in accordance with the approved Thermal Annealing 
Operating Plan, (2) reporting and quantification of the actual recovery 
results need not be reported unless the vessel was at or above the PTS 
screening criteria when annealing was started, and (3) the Thermal 
Annealing Operating Plan should specify the minimum content and a 
schedule for reporting the annealing results. The commenter provided a 
proposed list of criteria, content, and schedule for reporting the 
annealing results.
    One comment stated that no guidance was provided in the proposed 
rule on what constitutes components ``affected'' by the annealing 
operation that are required to be reported in the Thermal Annealing 
Operating Plan. The comment suggested alternative wording that 
components to be reported should be structures and components that are 
expected to experience significant temperature gradient or stress 
variations during the thermal annealing operation. One comment 
suggested qualifying the provision in the proposed rule that the 
effects of localized high temperatures must be evaluated for changes in 
thermal and mechanical properties of the reactor vessel insulation for 
those cases where such changes may be negligible at annealing 
conditions. One comment suggested that the use of applicable material 
data, such as data from integrated surveillance programs, be an 
optional part of the computational methods for determining fracture 
toughness recovery.
    The NRC reviewed the comments received on the proposed rule in 
detail. After consideration, the NRC reached the conclusion that most 
of the comments are not inconsistent with the intent of the proposed 
rule and in some cases reflect a need for clarification of the rule. In 
these cases, alternative wording that clarified the intent of the rule 
was substituted in the text. With respect to the comments on the 
requirement that reembrittlement rate after annealing must be monitored 
using a surveillance program, the NRC is aware that some plants do not 
have limiting materials for their existing preannealing surveillance 
programs. For these situations the staff has approved alternative 
surveillance plans on a case-by-case basis. Clearly, these plants will 
not have limiting material for surveillance programs for use in 
determining reembrittlement rates after annealing.
    The NRC recognizes that Appendix H of 10 CFR Part 50, which is 
referenced in this rule, does not specifically address the surveillance 
of an annealed reactor vessel. However, the requirements of Appendix H 
to 10 CFR Part 50 apply to all reactors including the specific case of 
an annealed reactor vessel. To clarify the surveillance requirements of 
an annealed plant, the final rule has been modified to include, as 
suggested, that the post-anneal reembrittlement is to be monitored 
using a surveillance program defined in the Thermal Annealing Report 
and that the surveillance program must conform to the intent of 
Appendix H to 10 CFR Part 50.
    The term reembrittlement ``rate'' in the proposed rule was intended 
to mean the projected amount of reembrittlement over a specific fluence 
period. It is recognized that reembrittlement is not a straight line 
function of fluence. Determination of reembrittlement rate is discussed 
in more detail in Draft Regulatory Guide 1.162, ``Format and Content of 
Report for Thermal Annealing of Reactor Pressure Vessels.'' In 
Regulatory Guide 1.162, the approved method for estimating the 
reembrittlement rate, the lateral shift method, results in the same 
embrittlement trend as that used for the pre-anneal operating period. 
To avoid confusion the term ``rate'' has been changed to ``trend'' in 
the final rule and the regulatory guide.
    The NRC agrees with the comments that the time and temperature 
profile required in the annealing operating plan should be bounding 
values. In this regard, Regulatory Guide DG-1027 calls for the thermal 
annealing operating plan to include identification of the 

[[Page 65461]]
limitations and permitted variations in temperature, time, heatup and 
cooldown rate. For clarification, the final rule has been modified to 
use the terms ``bounding conditions for times and temperatures and 
heatup and cooldown schedules'' to describe conditions that may not be 
exceeded during the annealing operation, and the lower limit time and 
temperature of the actual anneal is used for determining the projected 
recovery of fracture toughness by annealing.
    The NRC considers that the intent of paragraphs (c), Completion or 
Termination of Thermal Annealing, and (d), Thermal Annealing Results 
Report, of the final rule to be consistent with the two comments on 
that subject. The final rule does not require that the NRC approve 
restart following the annealing operation if the Thermal Annealing 
Operating Plan and the Requalification Inspection and Test Program was 
complied with. The NRC accepts the suggestion that the rule should be 
more specific on the items the licensee should include in the report 
and has included the list in the final rule.
    Finally, the NRC agrees with the suggestion to make clear that a 
report is not required if:
    (1) The licensee terminates the anneal prior to completion;
    (2) The partial anneal was otherwise in accordance with the Thermal 
Annealing Plan;
    (3) The licensee does not elect to take credit for any recovery. A 
statement was added to the Final Rule to cover the early termination 
situation.
    The NRC has accepted the suggested clarifications of what 
constitutes an ``affected'' component and the qualification on the 
requirement to evaluate changes in properties on reactor vessel 
insulation if these are negligible. The NRC considers it unnecessary to 
include a reference in the rule to data from integrated surveillance 
programs as an optional part of the computational methods to determine 
fracture toughness recovery. Generic computational methods for this 
purpose are provided in the Regulatory Guide 1.162. However, the final 
rule does not prohibit use of alternative methods if adequate 
justification is provided.

Appendix G to 10 CFR Part 50

    Two comments were received on the Appendix G to 10 CFR Part 50 of 
the proposed rule. The NEI comment, which was endorsed by five 
utilities and one NSSS organization, included a table with six items on 
Appendix G. The other comment on Appendix G was received from one of 
the five utilities. Two of the comments identified typographical errors 
and suggested a change in organization to improve clarity. One of the 
comments suggested revising the rule to change the definition of 
reference temperature, RTNDT, for cases where plants do not have 
data to comply with code procedures for determining RTNDT. One 
comment suggested a change in the title of Table 1, ``Pressure and 
Temperature Requirements,'' by adding to the title ``For the Reactor 
Pressure Vessel'' to make clear that this table does not apply to other 
components in the reactor coolant pressure system and proposed adding a 
footnote to the table for the same purpose. One comment identified an 
error in the minimum temperature requirements for the hydrostatic and 
leak testing of the pressure vessel without fuel when the vessel 
pressure is equal or below 20 percent of the vessel design pressure. 
One of the comments suggested that two of the entries in the table were 
new requirements when the table was intended to provide clarification. 
The utility's comment disagreed with the proposed rule change to 
prohibit the use of nuclear heat for the performance of vessel leak and 
hydrostatic testing. The utility contended that using nuclear heat, by 
providing a significant temperature margin above the pressure and 
temperature limit curves, greatly reduces the probability of brittle 
fracture and should be allowed.
    The NRC corrected the typographical errors and corrected the 
minimum temperature requirement for the hydrostatic and leak testing of 
the pressure vessel at low vessel pressures and without fuel. The title 
to Table 1 was changed, as suggested, for clarification.
    The NRC does not agree with the proposal to change the definition 
of RTNDT. The situation described in the comment, when data is not 
available to comply with code procedures, is presently handled on a 
case-by-case basis in accordance with MEB Branch position, MEB 5-2. The 
NRC staff does not agree with the comment that the two requirements 
cited are new requirements. Item 2.2.c. and Item 2.2.d of Table 1 are 
in the existing ASME code requirement and in Paragraph IV.A.3. in the 
rule. The NRC also does not agree with the utility's comment that using 
nuclear heat greatly reduces the probability of brittle fracture. The 
reasons for this are set forth in the February 2, 1990, letter to 
Messrs. Reynolds and Stenger of NUBARG from James M. Taylor, Executive 
Director for Operations.

Appendix H to 10 CFR Part 50

    Three comments were received on Appendix H to 10 CFR 50. The 
comment from NEI was endorsed by the five utilities and the NSSS. Two 
of the five utilities submitted additional comments. NEI and one 
utility commented that the proposed change to Paragraph III.B.1, which 
establishes the applicable edition of ASTM standard E 185 for a reactor 
surveillance program, constituted a backfit that would require a 
substantial design change in the surveillance program for those plants 
fabricated to a code edition prior to 1973. The other two commenters 
suggested new changes to Appendix H to 10 CFR Part 50. One of the 
commenters noted that an existing provision in Appendix H to 10 CFR 
Part 50, not part of the proposed rule change, dealing with 
requirements for attaching capsule holders to the vessel wall is a 
reiteration of a requirement in the ASME Code and should be removed. 
The other commenter suggested a new change to Appendix H to 10 CFR Part 
50 to add a statement to the criteria for approval of an integrated 
surveillance program that would permit the use of surveillance 
specimens for extension of license purposes. The commenter also 
suggested that there is an apparent conflict between Paragraph III.C.2. 
and Paragraph III.C.3. that address requirements for an integrated 
surveillance.
    The provision in the proposed rule was changed and reference to 
ASTM E 185 73 was deleted to make clear that the surveillance programs 
must be designed to the edition of ASTM 185 that is current on the 
issue date of the ASME Code to which the reactor vessel was purchased 
or to a later edition through 1982. The Commission agrees with the 
industry comments that imposing the ASTM E 185 1973 edition is 
impractical because vessels purchased prior to 1973 could not 
necessarily comply with all of the surveillance requirements in the 
1973 edition of the ASTM standard. The NRC staff believes that the 
provision in the present rule on requirements for attaching capsule 
holders to the reactor vessel wall is required for clarity and should 
not be deleted. The comments related to the requirements for an 
integrated surveillance program were not persuasive to the NRC staff. 
The existing provisions of the rule do not preclude the application of 
the integrated surveillance program for extension of license purposes. 
The two paragraphs purported to be in conflict address separate items; 
one addresses the number of materials to be irradiated, 

[[Page 65462]]
specimen types, and number of specimens per reactor; the other 
addresses amount of testing.

Request for Comments on Issues Related to Thermal Annealing

    Comments were received from NEI on the five issues on thermal 
annealing that were included in the proposed rule at the Commission's 
direction. In addition, OCRE and one utility, Pacific Gas and Electric, 
submitted comments on Issue 4, concerning the preferred regulatory 
process (including opportunity for public participation). Public 
Comments on the five issues are summarized below:
    Issue 1: The technical adequacy of the NRC staff's guidance.
    Comment: The detailed comments submitted on 10 CFR 50.66 are 
summarized in the Summary of Comments section on the Thermal Annealing 
Rule. In addition, NEI suggested that draft Regulatory Guide, DG-1027, 
be revised to include acceptance criteria where an action is required, 
but the acceptance criteria was not defined. NEI further commented that 
the re-embrittlement rate equation (DG-1027, Equation 1) appeared to be 
very conservative and would result in a post-anneal operating life that 
is less than industry believes justified.
    Response: The NRC is concurrently revising the noted draft 
regulatory guide and will address this comment in the resolution of 
comments for the guide.
    Issue 2: The sufficiency of the guidance and criteria to support a 
certification that if satisfied, a plant with an annealed vessel can 
safely resume operation.
    Comment: NEI noted that ``The reactor pressure vessel thermal 
annealing rule and guide address appropriate issues to assure public 
health and safety and that the annealed reactor pressure vessel may be 
safely operated. The prior NRC staff approval of the reactor vessel 
annealing plan assures a clear process and criteria to restart 
following the vessel anneal. The licensee needs only to attest to 
compliance with the approved plan prior to resuming operations. The 
resumption of operations should not be needlessly delayed while a 
report documenting performance of the vessel anneal and recovery of the 
embrittled material properties is confirmed, because the vessel anneal 
will only improve the material properties. The final report should be 
submitted on a schedule that considers when the vessel would have 
exceeded the RTPTS or uppershelf energy (USE) screening criteria 
without an anneal. The material property recovery will document prior 
to the time when the vessel would have exceeded the screening criteria, 
thereby assuring that the vessel is safe to operate at restart and for 
the duration justified by the material embrittlement recovery.''
    Response: NRC agrees with the NEI comment, except NRC believes it 
is necessary for the licensee to submit the final report within three 
months of completing or terminating the anneal, unless an extension is 
authorized by the Director, Office of Nuclear Reactor Regulation.
    Issue 3: Whether health and safety concerns are best served by 
approval of the thermal annealing plan or of readiness for restart.
    Comment: NEI noted that ``The performance of a reactor pressure 
vessel anneal in accordance with an approved annealing plan improves 
the public health and safety by reducing the probability of core melt 
frequency. This improvement occurs because of the increase in reactor 
vessel material ductility. The amount of recovery achieved by a thermal 
anneal will be documented prior to the original date when the reactor 
vessel would have exceeded the PTS or USE screening limit. Therefore, a 
demonstration for ``restart readiness'' is an extra burden that will 
not provide any further improvement of the public health and safety.''
    Response: The NRC's determination as to the procedures for NRC 
review of the Thermal Annealing Operation Plan, Requalification 
Inspection and Test Program and justification for restart discussed 
below in further detail in the Opportunities for Public Participation 
section.
    Issue 4: The preferred regulatory process (including opportunities 
for public participation) and the commenter's basis for recommending a 
particular process.
    Comment: NEI noted that ``The industry recommends that a hearing 
opportunity be provided, but that it be a non-adjudicatory, 10 CFR Part 
2, Subpart L type hearing on the docketed record. The essential 
features of the hearing process proposed are as follows. The NRC would 
at time of receiving the licensee proposed annealing plan issue a 
Federal Register announcement that staff is performing the review per 
10 CFR 50.66. A Subpart L hearing could be held, if requested by an 
intervener, after the NRC staff has issued a safety evaluation report 
on the licensee annealing plan, but prior to commencement of the 
reactor vessel thermal annealing unless the NRC staff makes a ``no 
significant hazards determination.'' Enclosure 4 provides additional 
details that support this industry position.'' Additional detailed 
comments by NEI and the comments on this subject by OCRE are discussed 
under the Opportunities for Public Participation heading.
    Response: The rule provides for public participation in the 
regulatory process by incorporating a public meeting on the Licensee's 
Thermal Annealing Report a minimum of 30 days before the start of 
thermal annealing, and a public meeting after the licensee completes 
the anneal but before the reactor is restarted. The opportunity for 
public hearings in thermal annealing should be limited to those cases 
where there is an unreviewed safety question or a change to the 
Technical Specifications or where the licensee did not comply with the 
Thermal Annealing Operating Plan and Requalification Inspection and 
Test Program. Expanded discussion on this issue is provided below under 
the Opportunities for Public Participation heading.
    Issue 5: Whether there are health and safety issues concerning 
thermal annealing that cannot be addressed generically and would 
warrant plant-specific consideration.
    Comment: NEI noted that ``Thermal annealing to reduce material 
irradiation embrittlement is a well understood metallurgical 
phenomenon. The supporting thermal and stress analysis used to 
demonstrate that the vessel is not damaged during the anneal are 
standard technologies used at nuclear plants. Because thermal annealing 
uses well understood technology, public health and safety is reasonably 
assured.''
    Response: The NRC agrees with this comment.

Opportunities for Public Participation

    The Supplementary Information section of the proposed rule 
discussed the four options the Commission considered for structuring 
the regulatory process related to public participation in the NRC's 
review and approval of a licensee's proposal for thermal annealing of a 
reactor vessel. The proposed rule, at the Commission's direction, 
requested comments on the preferred regulatory process (including 
opportunities for public participation). The four options included:
    (1) No hearings under the rule as proposed;
    (2) Discretionary opportunity for hearing under rule as proposed in 
which situation the Commission would decide on a case-by-case basis to 
determine whether a hearing should be held; 

[[Page 65463]]

    (3) Required opportunity for hearing under rule as proposed, but 
work could commence if the NRC were to make a ``no significant hazard 
determination'' on the proposed thermal annealing; and
    (4) Modify the proposed rule to require suspension of license prior 
and during the thermal annealing at which time no hearing would be 
afforded and the license would only be reinstated if the licensee 
demonstrates that it has addressed the reactor embrittlement such that 
it is acceptable to operate the plant.
    Three comments were submitted on the subject. OCRE and NEI 
addressed all of the alternatives in detail and they, as well as one 
utility, identified and discussed individual preferred alternatives.
    NEI commented that each of the four alternatives has a sufficiently 
serious flaw to prevent adoption. With respect to the no hearing 
alternative, NEI agrees that annealing is presently subject to approval 
by the Director of NRR in accordance with Part 50 Appendix G rather 
than being the subject of a license amendment as an unreviewed safety 
question under Sec. 50.59. However, NEI believes that annealing is an 
important process from a regulatory standpoint and that public 
participation, in the form of informal hearings, is appropriate. NEI 
objected to a discretionary opportunity for a hearing because it 
provides significant uncertainty in the process for licensees and 
members of the public. NEI's objection to requiring a hearing, as 
discussed in staff Option 3, is that it would allow those who object to 
the resumption of operation, on other than technical grounds, to use 
hearings to delay restart. Option 4 is objectionable to NEI because it 
does not provide the licensee with any stability or predictability 
since the licensee would be required to demonstrate compliance after 
the annealing was performed, and does not provide the public with any 
opportunity to express its views.
    NEI further commented that a license amendment is not necessary to 
approve a thermal annealing plan because annealing will not change the 
reactor vessel or other components in a manner inconsistent with the 
facility technical specifications nor will it require changes in the 
FSAR, and further, that a licensee is not required to modify its 
procedures to address or accommodate the annealing process. NEI noted 
that, while there is an incentive for the licensee to obtain credit for 
its improved P/T curves, and could seek a licensee amendment to do so, 
the licensee's existing P/T curves could remain in force.
    Despite the conclusion that a license amendment is not necessary 
for thermal annealing, NEI recommended that a hearing opportunity be 
provided, but that it be a non-adjudicatory, Subpart L type hearing on 
the record. NEI gave the following advantages for this approach: (1) 
The NRC would be provided with a clear understanding of the licensee's 
annealing process, and the NRC's hearing process; (2) a Subpart L 
hearing is held on the written record and typically does not include 
the discovery or live testimony associated with adjudicatory hearings, 
but allows the public to participate in a meaningful way without 
consuming the vast NRC, licensee, and public resources required for an 
adjudicatory hearing; and (3) it would provide predictability and 
stability by ensuring that all issues which could be subject to a 
hearing are addressed prior to restart. Any inspection or test 
performed in order to restart would be for the purpose of confirming 
compliance with the rule.
    OCRE supported the proposed rule provided that the public hearing 
rights were preserved with regard to reactor pressure vessel annealing. 
It is OCRE's position on the request for public comment that, based on 
the Sholly decision, the NRC must offer the opportunity for a formal 
adjudicatory hearing on the application for annealing and on the 
licensee's justification for subsequent operation where the licensee 
cannot certify that the thermal annealing was performed in accordance 
with the approved application. OCRE commented that approval by the 
Director of NRR of the application for annealing and restart of the 
reactor, if the licensee cannot certify that annealing was performed in 
accordance with the approved application, will give the licensee the 
authority to operate in ways in which they otherwise could not, and is 
thus, a de facto license amendment. OCRE fully supported Option 3 which 
requires opportunity for hearing under the rule as proposed. OCRE 
suggested that the adequacy of the thermal annealing plan, as well as 
the vessel's ability to perform its safety function after annealing, 
could be raised in the hearing on the thermal annealing plan and that 
the licensee's implementation of the thermal annealing plan could not 
commence until any hearing is concluded or unless the NRC makes a ``no 
significant hazards determination'' with respect to thermal annealing.
    With respect to Option 1, OCRE concluded that the informal hearings 
or public meetings proposed by the Commission for the initial thermal 
annealing are not a substitute for adjudicatory hearings required by 
the Atomic Energy Act (AEA) and do not give the interveners the same 
rights as they would have in a Section 189a hearing. OCRE found Option 
2 preferable to having no hearing. However, OCRE contended that this 
option is flawed by the assumption that ``Section 189a of the AEA does 
not afford an interested member of the public a right to request a 
hearing.'' They contend that approval by the Director, NRR to anneal 
the reactor pressure vessel or to restart after annealing does 
constitute a de facto operating licensing amendment for which the 
opportunity for a hearing is required. OCRE found Options 1 and 4 
unacceptable in that they do not provide the opportunity for a formal 
adjudicatory hearing.
    The comment from the utility suggested that Option 1 is the 
appropriate approach as long as the annealing process to be implemented 
is approved in advance by the NRC staff and the utility certifies that 
they have complied with the approved annealing process during the 
annealing operation, as provided for in the proposed rule. The utility 
further commented that if Technical Specifications changes or 
amendments to the operating license are required in order to perform 
the annealing then the opportunity for hearings would be required due 
to the normal license amendment process and if the final safety 
analysis report (FSAR) were required to be updated to reflect the 
thermal annealing process, the provisions of 10 CFR 50.59 would apply. 
The utility suggested that if those changes did not constitute an 
``unreviewed safety question,'' no amendment would be needed and the 
license amendment process should not be invoked and that if a member of 
the public is concerned about a licensee's compliance with the NRC 
approved thermal annealing plan, those concerns could be addressed 
pursuant to the 10 CFR 2.206 petition process. The utility commented 
that, under its proposal, existing regulatory provisions for public 
participation would apply as appropriate and no new prescriptive 
requirements would be necessary.
    The Commission has considered the public comments and has modified 
the proposed rule as follows. A licensee that seeks to utilize thermal 
annealing to mitigate the effects of neutron irradiation of the nuclear 
reactor vessel must, at least three years prior to the date at which 
the limiting fracture toughness criteria in Sec. 50.61 or Appendix G to 
Part 50 would be exceeded, submit a Thermal Annealing Report to the NRC 
staff for review. The 

[[Page 65464]]
report shall contain four sections: (i) Thermal Annealing Operating 
Plan, (ii) Requalification Inspection and Test Program, (iii) Program 
for determining Fracture Toughness Recovery and Reembrittlement Trend, 
and (iv) a section identifying any changes to the description of the 
facility as described in the updated final safety analysis report 
(FSAR) which constitute unreviewed safety questions (USQs) under 
Sec. 50.59, and changes to the facility's technical specifications, 
which are necessary either to perform the thermal annealing, or to 
operate following completion of the annealing. Section 50.66(a) 
provides that the NRC will, within three years of submission of a 
licensee's annealing report, document its views on whether the plan for 
conducting thermal annealing constitutes an unreviewed safety question 
or otherwise requires a change to the plant's technical specifications. 
Such a determination is the threshold determination for whether NRC 
approval is required before undertaking the activity. In the event the 
NRC were to conclude, contrary to the licensee, that an unreviewed 
safety question is present or a change to the technical specifications 
is necessary, the NRC would, as a discretionary enforcement matter, 
issue an appropriate order to the licensee prohibiting annealing prior 
to issuance of a license amendment. An opportunity for formal 
adjudicatory hearing would be provided in connection with the license 
amendment; however, if the NRC makes a finding that the proposed change 
to the FSAR description or technical specification constitutes a ``no 
significant hazards consideration'' pursuant to Section 189.(a)(2)(A), 
the licensee may conduct the thermal annealing prior to completion of 
any hearing. In any event, at least 30 days before the licensee starts 
to thermal anneal and before the NRC completes its review, the NRC will 
hold a public meeting on the licensee's proposed Thermal Annealing Plan 
and Requalification Inspection and Test Program.
    Following the completion of the annealing operation, the licensee 
must confirm in writing to the Director, Office of Nuclear Reactor 
Regulation, that the thermal annealing was performed in accordance with 
the Thermal Annealing Operating Plan and the Requalification and 
Inspection Test Program. In support of this confirmation, the licensee 
must submit a report, within three months of completion or termination 
of the anneal, that presents the results of the annealing operation. 
Within two weeks of the licensee's written confirmation that the 
thermal annealing was completed in accordance with the Thermal 
Annealing Plan, and prior to restart, the NRC shall: (1) Place in its 
public document room a summary of the NRC staff's inspection of the 
licensee's thermal annealing process to confirm that the thermal 
annealing was completed in accordance with the Thermal Annealing 
Operating Plan and the Requalification Inspection and Test Program, and 
(2) hold a public meeting with the licensee to permit the licensee to 
explain the results of the reactor vessel annealing to the NRC and the 
public, for the NRC to discuss its inspection of the reactor vessel 
annealing process, and to provide an opportunity for the public to 
comment to the NRC on the annealing operation and the results of the 
Staff's inspection.
    Within 45 days of the licensee's written confirmation that the 
thermal annealing was completed, the NRC shall complete full 
documentation of the NRC's inspection of the licensee's annealing 
process to confirm that the annealing was completed in accordance with 
the Thermal Annealing Operating Plan and the Requalification Inspection 
and Test Program.
    The licensee may resume operation if: (1) The licensee concludes 
that the thermal annealing operation was performed in compliance with 
the Thermal Annealing Operating Plan, the Requalification Inspection 
and Test Program, and the provisions of Section 50.66(b), (2) a summary 
of the NRC's inspection of the thermal annealing is placed in the NRC 
public document room as required by Section 50.66(c) (2) and (3) the 
NRC holds the public meeting required by Section 50.66(f)(2), unless 
the staff takes action against the licensee. Since NRC approval to 
resume operation is not necessary, an opportunity for hearing would not 
be provided in this situation. If, however, the licensee cannot 
conclude that the thermal annealing was performed in compliance with 
the Thermal Annealing Operating Plan or the Requalification Inspection 
and Test Program, the licensee must submit a justification for 
continued operation to the Director. If the noncompliance presents an 
unreviewed safety question, as determined by the licensee or directed 
by the NRC following its review of the report, then the plant may not 
restart until the Director has approved restart. Those failures to 
comply with the Thermal Annealing Operating Plan and the 
Requalification Inspection and Test Program, which either (1) Are 
considered to be ``unreviewed safety questions'' or (2) require changes 
to the technical specifications as a result of the noncompliances, 
would also be subject to an opportunity for a formal adjudicatory 
hearing in accordance with the Commission's regulations governing 
license amendments. However, the licensee may restart prior to 
completion of the hearing if the Director makes a finding that such 
restart constitutes a ``no significant hazards consideration,'' as 
provided under Section 189.(a)(2)(A) of the Atomic Energy Act of 1954, 
as amended.
    The regulatory process for thermal annealing and the associated 
hearing opportunities are consistent with long-standing NRC regulatory 
practices defining those matters which present sufficient potential 
effect on public health and safety (e.g., are unreviewed safety 
questions) to justify both prior NRC review of the change, and an 
opportunity for hearings (with the associated time and resource impacts 
on both the licensee and the NRC). With respect to the thermal 
annealing review process, the Commission reassessed the regulatory 
requirements and processes for assuring safety. The Commission 
determined that the most important safety matters are normally 
addressed in license conditions, technical specifications, and the 
FSAR. The regulatory process for NRC consideration of licensee-
initiated changes concerning these matters, and the associated 
opportunities for hearings is in 10 CFR 50.59. In view of this well-
established regulatory process for important safety information, the 
Commission determined that a regulatory process requiring NRC approval 
of a thermal annealing plan is not necessary, because the licensee is 
already required to comply with its license conditions, technical 
specifications, and FSAR. Important changes to license conditions, 
technical specifications, and FSAR from a safety standpoint are subject 
to both prior NRC review and approval and an opportunity for hearing. 
With respect to restart following completion of the annealing, the 15-
day delay period should be sufficient time for review of the licensee's 
input given the NRC staff's understanding of the annealing operation 
plan prior to implementation, ongoing resident inspections and 
headquarters inspections of the implementation of thermal annealing 
operating plan. The Commission did not adopt NEI's suggestion for 
informal hearings where the Director must approve restart if the 
Thermal Annealing Operating Plan and Requalification Inspection and 
Test Program were not complied with, because the Commission does not 
see 

[[Page 65465]]
any distinction (in terms of safety implications) between the subject 
matter of hearings under this rule, as compared with other actions 
under Part 50 which would require formal hearings.
    As discussed earlier in the supplementary information, previously 
performed research analyses indicated the potential for plastic 
deformation of the main coolant piping for a typical U.S. plant design 
and anticipated annealing conditions. There are also questions 
regarding how thermal growth of the pressure vessel is treated, and the 
adequacy of the thermal and stress analyses used to predict response of 
the overall system under thermal annealing conditions. Additionally, 
there may be questions in other areas such as temperature limits for 
the concrete structures, and potential radiological hazards associated 
with removing and storing the reactor internals during the annealing 
process, and fire hazards associated with heating the vessel.
    Recognition of the numerous complex technical questions related to 
4 thermal annealing and of the potential benefits for operating nuclear 
power plants has resulted in a cooperative effort, funded by the U.S. 
Department of Energy and the industry, to perform Annealing 
Demonstration Projects. Projects are planned to demonstrate two 
different annealing processes, evaluating heater designs and vessel 
designs. It is anticipated that the annealing demonstration projects 
will answer many of the generic questions regarding thermal annealing 
of U.S. pressure vessel and piping designs.
    The Thermal Annealing Report, required by the thermal annealing 
rule, is designed to facilitate a detailed review by the licensee of 
plant-specific questions and considerations in performing a thermal 
annealing. The proposed rule specifically discusses the potential for 
unreviewed safety questions and technical specification changes that 
may result from or be related to thermal annealing of the reactor 
pressure vessel. With completion of the demonstration projects and as 
the staff and industry gain experience with thermal annealing, many of 
the issues related to annealing will be better understood and related 
questions will be answered. However, until this experience is realized, 
the staff will critically review licensee determinations regarding 
unreviewed safety questions and the need for technical specification 
changes associated with each proposed thermal annealing. The level of 
staff effort is expected to be significantly greater during its review 
of the initial proposed vessel annealings than that which will be 
required after experience is gained.
    The thermal annealing rule has been structured to provide time for 
the staff to thoroughly review the licensee's annealing plan and 
determination regarding unreviewed safety questions and the need for 
technical specification changes. If the staff identifies an unreviewed 
safety question or the need for a technical specification change, the 
licensee would be so notified and the existing NRC regulatory practices 
would be invoked to address the issues.

Backfitting Issues

    Comments were received on backfitting issues from the Nuclear 
Utility Backfitting and Reform Group (NUBARG). NUBARG commented that 
they do not object to the new NRC position in Appendix G to 10 CFR Part 
50 which prohibits core criticality before completion of hydrostatic 
pressure and leak tests as a conservative measure to enhance safety. 
However, they are concerned that amending Appendix G on the basis of a 
compliance exception may set a bad precedent for avoiding backfitting 
analyses. NUBARG stated that ``The logic of the proposed rule would 
seem to allow the NRC to avoid a backfitting analysis by (1) invoking 
the intent of one requirement to override the explicit provisions of 
another, (2) using the compliance exception when the practice being 
eliminated seems specifically contemplated by and specified in the 
pertinent regulation, and (3) overlooking the fact that the NRC has 
apparently accepted this position in practice by some licensees * * *'' 
In NUBARG's view, this proposed amendment should be supported by a 
backfit analysis. The Commission has reviewed this comment and has 
concluded that use of the compliance exception under Sec. 50.109 for 
the changes in Appendix G to 10 CFR Part 50 is appropriate. The Backfit 
Analysis section contains further discussion on this subject. The issue 
of explicitly prohibiting core criticality before completing pressure 
and leak tests has been addressed previously (letter from J. M. Taylor, 
EDO, to N. S. Reynolds and D. F. Stenger, NUBARG, dated February 2, 
1990) and the NUBARG comment did not provide new information. The 
Commission has concluded that any backfit requirements in this 
amendment are necessary to bring the facilities into compliance with 
licenses, or the rules and orders of the Commission, or into 
conformance with written commitments by the licensees. Therefore, a 
backfit analysis is not required pursuant to 10 CFR 50.109(a)(4)(i).
    NUBARG also commented on the amendment to Appendix H to 10 CFR Part 
50 regarding surveillance that would preclude reducing the amount of 
testing if the initial test results agreed with predicted results. 
Although NUBARG recognizes the change would be prospective, it believes 
that NRC should provide flexibility to allow continued relief for any 
licensee who lacks such an authorization but has relied on the 
provision. The Commission believes that sufficient flexibility already 
exists in that licensees who do not have an authorization may seek an 
exemption under 10 CFR Part 50.12.
    Another aspect of the backfitting concern raised by NUBARG 
addresses the proposed amendment to Sec. 50.61 which, based on the 
adequate protection exception, would impose a uniform methodology for 
calculating the reference temperature. NUBARG contends that to rely on 
the adequate protection exception is arguably erroneous because the 
change in methodology is not likely an adequate protection issue (i.e., 
for most plants, the screening criteria will not be approached for many 
years). As discussed further under Backfit Analysis, the Commission 
believes that a new backfit analysis is not required for this 
conforming change, which corrects an inadvertent omission from the 
previous rulemaking. Therefore, the Commission concludes that the 
adequate protection basis for the backfit continues to apply from the 
previous rulemaking (56 FR 22300; May 15, 1991) to Sec. 50.61.

Criminal Penalties

    For purposes of Section 223 of the Atomic Energy Act (AEA), the 
Commission is issuing the final rule under one or more of Sections 
161b, 161i or 161o of the AEA. Willful violations of the rule will be 
subject to criminal enforcement.

Finding of No Significant Environmental Impact

    The Commission has
FR Doc. 95-30665 Fracture Toughness Requirements for Light Water Reactor Pressure Vessels
 determined under the National Environmental 
Policy Act of 1969, as amended, and the Commission's regulations in 
Subpart A of 10 CFR Part 51, that this rule is not a major Federal 
action significantly affecting the quality of human environment and, 
therefore, an environmental impact statement is not required.
    The individual actions covered in this final rule would either 
serve to enhance safety of the reactor pressure vessel, thereby 
decreasing the environmental impact of plant operation, or have no 

[[Page 65466]]
impact on the environment. Therefore, in all cases these individual 
actions will not have an adverse impact on the environment.

PTS Rule (10 CFR 50.61)

    The inclusion of thermal annealing as an option for mitigating the 
effects of neutron irradiation serves to decrease the environmental 
impact of plant operation by enhancing the safety of the reactor 
pressure vessel.
    The incorporation of the Regulatory Guide 1.99, Revision 2, method 
for determining RTNDT into the PTS rule has no impact on the 
environment because this change will result in values of RTPTS 
which are consistent with those currently used in plant operation.
    The restructuring of the PTS rule is the type of action described 
in categorical exclusion 10 CFR 51.22(c)(2). Therefore, an 
environmental assessment is not necessary for this change.

Thermal Annealing Rule (10 CFR 50.66)

    The thermal annealing rule (10 CFR 50.66) permits and provides 
requirements for the thermal annealing of a reactor vessel to restore 
fracture properties of the reactor vessel material which have been 
degraded by neutron irradiation. This final rule only applies when a 
licensee elects to use it. The final rule provides an alternative for 
assuring compliance with the requirements in 10 CFR 50.61 and Appendix 
G of 10 CFR Part 50.
    The application of thermal annealing to a reactor vessel improves 
the condition of the reactor vessel material. In addition, this rule 
establishes requirements to avoid damaging the reactor system and to 
protect against accidents during the annealing operation.
    This rule is one of several regulatory requirements that will 
function to ensure reactor vessel integrity. In that sense, this rule 
has a positive impact on the environment by reducing the potential for 
vessel failure. For these reasons, the Commission has determined that 
there is no significant impact and, therefore, an environmental 
statement is not required.

Appendix G to 10 CFR Part 50

    The prohibition of core criticality before completion of the 
required pressure and leak tests will serve to reduce the potential for 
vessel failure, and thereby decrease the potential environmental impact 
of plant operation.
    The restructuring of Sections IV and V of Appendix G is clarifying 
or corrective in nature, and is the type of action described in 
categorical exclusion 10 CFR 51.22(c)(2). Therefore, an environmental 
assessment is not necessary for this change.
    The changing of the reference from Appendix G of Section III of the 
ASME Code to Appendix G of Section XI of the ASME Code has no impact on 
the environment because the requirements in the Appendices are 
identical. Therefore, there is no adverse impact on the environment 
from this change.
    The referencing of the thermal annealing rule results in no adverse 
impact on the environment because Appendix G currently permits the use 
of thermal annealing to reduce fracture toughness loss of the RPV 
materials due to irradiation embrittlement.

Appendix H to 10 CFR Part 50

    Concerning the amendments to Appendix H to 10 CFR Part 50 in the 
final rule, the requirement that all irradiation surveillance tests be 
made (i.e., no reduction in testing is permitted) will have a positive 
impact on the environment in helping to assure the integrity of the 
reactor pressure vessel.
    The restructuring of Section II.C is the type of action described 
in categorical exclusion 10 CFR 51.22(c)(2). Therefore, an 
environmental assessment is not necessary for this change.
    The clarification of the applicable version of ASTM Standard E 185 
will result in no adverse impact to the environment since there will be 
no change to current surveillance programs. Changes to future 
surveillance programs will make the programs more effective in 
assessing irradiation embrittlement effects to the RPV materials, 
thereby helping to assure the integrity of the reactor pressure vessel

Paperwork Reduction Act Statement

    This final rule amends information collection requirements that are 
subject to the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et 
seq.). These requirements were approved by the Office of Management and 
Budget, approval number 3150-0011.
    The public reporting burden for this collection of information is 
estimated to average 6,000 hours per response, including the time for 
reviewing instructions, searching existing data sources, gathering and 
maintaining the data needed, and completing and reviewing the 
collection of information. Send comments regarding the burden estimate 
or any other aspect of this collection of information, including 
suggestions for reducing the burden, to the Information and Records 
Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and to the Desk Officer, Office of 
Information and Regulatory Affairs, NEOB-10202, (3150-0011), Office of 
Management and Budget, Washington, DC 20503.

Public Protection Notification

    The NRC may not conduct or sponsor, and a person is not required to 
respond to, a collection of information unless it displays a currently 
valid OMB control number.

Regulatory Analysis

    The NRC staff has prepared a regulatory analysis for the amendments 
to 10 CFR 50.61, Appendix G of 10 CFR Part 50, and Appendix H of 10 CFR 
Part 50 that describes the factors and alternatives considered by the 
Commission in deciding to issue these amendments. A copy of the 
regulatory analysis is available for inspection and copying for a fee 
at the NRC Public Document Room, 2120 L Street NW. (Lower Level), 
Washington, DC 20555-0001. Single copies of the analysis may be 
obtained from Alfred Taboada, Office of Nuclear Regulatory Research, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, 
telephone (301) 415-6014.

Regulatory Flexibility Act Certification

    As required by the Regulatory Flexibility Act, 5 U.S.C. 605(b), the 
Commission certifies that this final rule will not have a significant 
economic impact on a substantial number of small entities. The rules 
which are affected by the amendments will: (1) Preclude brittle 
fracture of embrittled vessels during PTS events, (2) provide the 
general fracture toughness requirements for RPVs, including ductile 
fracture toughness requirements and pressure-temperature limits, (3) 
provide the requirements for surveillance programs to monitor 
irradiation embrittlement of RPV beltline materials, and (4) provide 
for a method for restoring the fracture toughness of RPV beltline 
materials used in nuclear facilities licensed under the provision of 10 
CFR 50.21(b) and 10 CFR 50.22. The companies that own these facilities 
do not fall within the scope of the definition of ``small entities'' as 
set forth in the Regulatory Flexibility Act, the Small Business Size 
Standards in regulations issued by the Small Business Administration at 
13 CFR Part 121, or the size standards established by the NRC at 10 CFR 
2.810 (60 FR 18344; April 11, 1995).

[[Page 65467]]

Backfit Analysis

PTS Rule (10 CFR 50.61)

    The revision to Sec. 50.61 requires licensees to calculate 
RTPTS using the same methodology specified in Regulatory Guide 
1.99, Revision 2, for determining RTNDT. This change was logically 
a requisite part of the previous rulemaking (56 FR 22300; May 15, 1991) 
to Sec. 50.61 that set forth a unified method for calculating radiation 
embrittlement of the reactor beltline materials in Part 50. However, 
the Commission, at that time, inadvertently failed to make the 
conforming change to Sec. 50.61. The Commission believes that the 
backfit statement for the previous amendment, which determined that the 
backfit was necessary to ensure that the facility continues to provide 
adequate protection to the public health and safety, is applicable to 
this conforming change to Sec. 50.61.
    The restructuring of the PTS rule does not impose any backfits as 
defined in 10 CFR 50.109(a)(1) because there is no change in 
requirements due to this restructuring.
    The inclusion of thermal annealing in Sec. 50.61 does not 
constitute a backfit as defined in 10 CFR 50.109(a)(1) because the 
decision to perform annealing is voluntary, no annealing has been 
conducted in this country, and there are no staff positions or 
Commission requirements relied upon by licensees that are being 
changed.

Thermal Annealing Rule (10 CFR 50.66)

    The final thermal annealing rule establishes requirements with 
respect to applications for thermal annealing. However, the Commission 
has determined that the rule does not impose a ``backfit'' as defined 
in 10 CFR 50.109(a)(1). The thermal annealing rule does not require any 
licensee to perform thermal annealing. Under existing requirements, all 
licensees are required to evaluate whether they exceed the PTS 
screening limits in 10 CFR 50.61 and the Charpy upper shelf screening 
limits in Appendix G of CFR Part 50. However, these rules provide an 
alternative means for meeting these screening limits (e.g., performing 
thermal annealing). No licensee currently has pending before the NRC an 
application for thermal annealing, nor has any current licensee been 
granted permission to conduct thermal annealing. The rule does not 
reflect any new or different NRC staff position which conflicts with a 
prior NRC staff position or Commission rule. Thus, the final rule will 
have a purely prospective effect on future applications for thermal 
annealing. The Commission has stated in other rulemakings establishing 
prospective requirements (10 CFR Part 52 and the License Renewal Rule, 
10 CFR Part 54) that the Backfit Rule was not intended to protect the 
future applicant from current changes in Commission requirements. 
Accordingly, the Commission concludes that the rule does not impose 
backfits and a backfit analysis need not be prepared for the final 
thermal annealing rule.

Appendix G to 10 CFR Part 50

    The restructuring of Sections IV and V of this appendix, 
referencing of the thermal annealing rule, changing the reference from 
Appendix G of Section III of the ASME Code to Appendix G of Section XI 
of the ASME Code, and deleting the ``design to permit annealing'' 
requirement do not impose any backfits as defined in 10 CFR 
50.109(a)(1), because they are either prospective in nature or are of a 
clarifying nature.
    10 CFR Part 50, Appendix G, Paragraph IV.2.d. of the final rule 
explicitly prohibits core criticality before completion of ASME Code 
hydrostatic pressure and leak tests. This is intended to make clear 
that licensees may not use nuclear heat in order to perform ASME Code 
hydrostatic tests. This amendment can be construed as a backfit, 
inasmuch as the prior version of 10 CFR Part 50, Appendix G, Paragraph 
IV.A.5 could be read to permit core criticality during ASME hydrostatic 
tests and Section XI of the ASME Code does not explicitly prohibit core 
criticality prior to completion of these tests. However, the Commission 
never intended the disputed language in Paragraph IV.A.5 of Appendix G 
to permit core criticality before successful completion of the required 
ASME hydrostatic tests. The scope of Appendix G is ``fracture toughness 
requirements'' only; that scope is stated clearly in the title of 
Appendix G, and Appendix G was not intended to specify system 
operational requirements. It is not correct, therefore, to interpret 
paragraph IV.A.5. as permitting nuclear hydrotesting. The final phrase 
in IV.A.5, ``depending on whether the core is critical during the 
test,'' was included in the rule for the sake of completeness, to 
specify appropriate fracture toughness requirements in the event that a 
licensee for some reason wanted to have the core critical during 
hydrotest, and was given approval to do so (e.g., as in the case of the 
Hatch units, where nuclear hydrotesting was allowed one last time as an 
approved exception.) The ASME Code's hydrostatic testing provisions for 
the reactor coolant pressure boundary (RCPB) provides the necessary 
assurance that GDC-14 is met. GDC-14 inter alia requires RCPB testing 
in order to provide an extremely low probability of RCPB failure, in 
terms of abnormal leakage, rapidly propagating failure, and gross 
rupture. Using heat produced by a critical reactor core to perform such 
testing essentially undercuts the basic safety principle embodied in 
GDC-14 that testing should be completed prior to nuclear reactor 
operation. It makes little sense to allow core criticality--thereby 
allowing the reactor to be in an operational condition where a loss of 
coolant could have significant consequences--prior to successful 
completion of tests that are intended to ensure that the probability of 
such coolant losses during such an operational condition are extremely 
low.\1\ The ASME Code, Section XI, requires that the System Leakage 
Test be performed prior to plant startup following each refueling 
outage (Table-2500-1, Examination Category B-P, Note 2). The only way 
to interpret the ASME Code as permitting core criticality prior to 
completion of the hydrostatic tests is to read the term, ``plant 
startup'' as referring to something other than reactor criticality. 
This is neither the normal industry practice, nor has it been the NRC 
staff's longstanding interpretation of this provision of the ASME code. 
Indeed, it does not appear that the NRC staff has construed either 
Appendix G, Paragraph IV.A.5 nor Section XI of the ASME Code as 
permitting core criticality prior to successful completion of ASME Code 
hydrostatic tests. Moreover, the vast majority of nuclear utility 
licensees do not use nuclear heat to perform ASME code hydrostatic 
tests. This suggests that most licensees hold the same interpretation 
of Appendix G and Section XI of the ASME Code as the Commission. In 
sum, the Commission believes Section XI of the ASME Code, which is 
endorsed by 10 CFR 50.55a, implicitly prohibits core criticality prior 
to successful completion of hydrostatic testing. Therefore, the 
Commission concludes that the change in the language of Appendix G, 
Paragraph IV.2.d. is necessary to assure compliance with 10 CFR 50.55a 
and the ASME Code.

    \1\ The Commission is aware that NUBARG has presented an 
argument to the NRC that performance of ASME Code hydrostatic tests 
are more effective at the higher temperatures achieved when using 
nuclear heat, as compared with the heat sources normally employed by 
utilities in performing the hydrostatic tests. However, for the 
reasons set forth in the 1990 letter from James M. Taylor, EDO to N. 
S. Reynolds and D.F. Stenger, NUBARG, the Commission rejects this 
argument.

[[Page 65468]]

---------------------------------------------------------------------------

    The Commission has concluded that any backfit requirements in this 
amendment are necessary to bring the facilities into compliance with 
licenses, or the rules and orders of the Commission, or into 
conformance with written commitments by the licensees. Therefore, a 
backfit analysis is not required pursuant to 10 CFR 50.109(a)(4)(i).

Appendix H to 10 CFR Part 50

    The amendments to Appendix H to 10 CFR Part 50 are either 
prospective in nature or of a clarifying nature, and hence do not 
involve any provisions which would impose backfits as defined in 10 CFR 
50.109(a)(1).

List of Subjects in 10 CFR Part 50

    Antitrust, Classified information, Criminal penalties, Fire 
protection, Intergovernmental relations, Nuclear power plants and 
reactors, Radiation protection, Reactor siting criteria, Reporting and 
record keeping requirements.

    For the reasons set out in the preamble and under the authority of 
the Atomic Energy Act of 1954, as amended; the Energy Reorganization 
Act of 1974, as amended; and 5 U.S.C. 552 and 553; the NRC is adopting 
the following amendments to 10 CFR Part 50.

PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION 
FACILITIES

    1. The general authority citation for Part 50 is corrected to read 
as set forth below, and the section-specific authority citations 
continue to read as follows:

    Authority: Secs. 102, 103, 104, 105, 161, 182, 183, 186, 189, 68 
Stat. 936, 937, 938, 948, 953, 954, 955, 956, as amended, sec. 234, 
83 Stat. 1444, as amended (42 U.S.C. 2132, 2133, 2134, 2135, 2201, 
2232, 2233, 2236, 2239, 2282); secs. 201, as amended, 202, 206, 88 
Stat. 1242, as amended 1244, 1246, (42 U.S.C. 5841, 5842, 5846).
    Section 50.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 
2951 (42 U.S.C. 5851). Section 50.10 also issued under secs. 101, 
185, 68 Stat. 955 as amended (42 U.S.C. 2131, 2235), sec. 102, Pub. 
L. 91-190, 83 Stat. 853 (42 U.S.C. 4332). Sections 50.13, and 
50.54(dd), and 50.103 also issued under sec. 108, 68 Stat. 939, as 
amended (42 U.S.C. 2138). Sections 50.23, 50.35, 50.55, and 50.56 
also issued under sec. 185, 68 Stat. 955 (42 U.S.C. 2235). Sections 
50.33a, 50.55a and Appendix Q also issued under sec. 102, Pub. L. 
91-190, 83 Stat. 853 (42 U.S.C. 4332). Sections 50.34 and 50.54 also 
issued under sec. 204, 88 Stat. 1245 (42 U.S.C. 5844). Sections 
50.58, 50.91, and 50.92 also issued under Pub. L. 97-415, 96 Stat. 
2073 (42 U.S.C. 2239). Section 50.78 also issued under sec. 122, 68 
Stat. 939 (42 U.S.C. 2152). Sections 50.80-50.81 also issued under 
sec. 184, 68 Stat. 954, as amended (42 U.S.C. 2234). Appendix F also 
issued under sec. 187, 68 Stat 955 (42 U.S.C. 2237).

    2. In Sec. 50.8, paragraph (b) is revised to read as follows:

Sec. 50.8  Information collection requirements: OMB approval.

* * * * *
    (b) The approved information collection requirements contained in 
this part appear in Secs. 50.30, 50.33, 50.33a, 50.34, 50.34a, 50.35, 
50.36, 50.36a, 50.48, 50.49, 50.54, 50.55, 50.55a, 50.59, 50.60, 50.61, 
50.63, 50.64, 50.65, 50.66, 70.71, 50.72, 50.73, 50.75, 50.80, 50.82, 
50.90, 50.91, 50.120, and Appendices A, B, E, G, H, I, J, K, M, N, O, 
Q, and R, to this part.
* * * * *
    3. Section 50.61 is revised to read as follows:

Sec. 50.61  Fracture toughness requirements for protection against 
pressurized thermal shock events.

    (a) Definitions. For the purposes of this section:
    (1) ASME Code means the American Society of Mechanical Engineers 
Boiler and Pressure Vessel Code, Section III, Division I, ``Rules for 
the Construction of Nuclear Power Plant Components,'' edition and 
addenda and any limitations and modifications thereof as specified in 
Sec. 50.55a.
    (2) Pressurized Thermal Shock Event means an event or transient in 
pressurized water reactors (PWRs) causing severe overcooling (thermal 
shock) concurrent with or followed by significant pressure in the 
reactor vessel.
    (3) Reactor Vessel Beltline means the region of the reactor vessel 
(shell material including welds, heat affected zones and plates or 
forgings) that directly surrounds the effective height of the active 
core and adjacent regions of the reactor vessel that are predicted to 
experience sufficient neutron radiation damage to be considered in the 
selection of the most limiting material with regard to radiation 
damage.
    (4) RTNDT means the reference temperature for a reactor vessel 
material, under any conditions. For the reactor vessel beltline 
materials, RTNDT must account for the effects of neutron 
radiation.
    (5) RTNDT(U) means the reference temperature for a reactor 
vessel material in the pre-service or unirradiated condition, evaluated 
according to the procedures in the ASME Code, Paragraph NB-2331 or 
other methods approved by the Director, Office of Nuclear Reactor 
Regulation.
    (6) EOL Fluence means the best-estimate neutron fluence projected 
for a specific vessel beltline material at the clad-base-metal 
interface on the inside surface of the vessel at the location where the 
material receives the highest fluence on the expiration date of the 
operating license.
    (7) RTPTS means the reference temperature, RTNDT, 
evaluated for the EOL Fluence for each of the vessel beltline 
materials, using the procedures of paragraph (c) of this section.
    (8) PTS Screening Criterion means the value of RTPTS for the 
vessel beltline material above which the plant cannot continue to 
operate without justification.
    (b) Requirements.
    (1) For each pressurized water nuclear power reactor for which an 
operating license has been issued, the licensee shall have projected 
values of RTPTS, accepted by the NRC, for each reactor vessel 
beltline material for the EOL fluence of the material. The assessment 
of RTPTS must use the calculation procedures given in paragraph 
(c)(1) of this section, except as provided in paragraphs (c)(2) and 
(c)(3) of this section. The assessment must specify the bases for the 
projected value of RTPTS for each vessel beltline material, 
including the assumptions regarding core loading patterns, and must 
specify the copper and nickel contents and the fluence value used in 
the calculation for each beltline material. This assessment must be 
updated whenever there is a significant 2 change in projected 
values of RTPTS, or upon a request for a change in the expiration 
date for operation of the facility.

    \2\ Changes to RTPTS values are considered significant if 
either the previous value or the current value, or both values, 
exceed the screening criterion prior to the expiration of the 
operating license, including any renewed term, if applicable, for 
the plant.
---------------------------------------------------------------------------

    (2) The pressurized thermal shock (PTS) screening criterion is 270 
deg.F for plates, forgings, and axial weld materials, and 300  deg.F 
for circumferential weld materials. For the purpose of comparison with 
this criterion, the value of RTPTS for the reactor vessel must be 
evaluated according to the procedures of paragraph (c) of this section, 
for each weld and plate, or forging, in the reactor vessel beltline. 
RTPTS must be determined for each vessel beltline material using 
the EOL fluence for that material.
    (3) For each pressurized water nuclear power reactor for which the 
value of RTPTS for any material in the beltline is projected to 
exceed the PTS screening criterion using the EOL fluence, the licensee 
shall implement those flux 

[[Page 65469]]
reduction programs that are reasonably practicable to avoid exceeding 
the PTS screening criterion set forth in paragraph (b)(2) of this 
section. The schedule for implementation of flux reduction measures may 
take into account the schedule for submittal and anticipated approval 
by the Director, Office of Nuclear Reactor Regulation, of detailed 
plant-specific analyses, submitted to demonstrate acceptable risk with 
RTPTS above the screening limit due to plant modifications, new 
information or new analysis techniques.
    (4) For each pressurized water nuclear power reactor for which the 
analysis required by paragraph (b)(3) of this section indicates that no 
reasonably practicable flux reduction program will prevent RTPTS 
from exceeding the PTS screening criterion using the EOL fluence, the 
licensee shall submit a safety analysis to determine what, if any, 
modifications to equipment, systems, and operation are necessary to 
prevent potential failure of the reactor vessel as a result of 
postulated PTS events if continued operation beyond the screening 
criterion is allowed. In the analysis, the licensee may determine the 
properties of the reactor vessel materials based on available 
information, research results, and plant surveillance data, and may use 
probabilistic fracture mechanics techniques. This analysis must be 
submitted at least three years before RTPTS is projected to exceed 
the PTS screening criterion.
    (5) After consideration of the licensee's analyses, including 
effects of proposed corrective actions, if any, submitted in accordance 
with paragraphs (b)(3) and (b)(4) of this section, the Director, Office 
of Nuclear Reactor Regulation, may, on a case-by-case basis, approve 
operation of the facility with RTPTS in excess of the PTS 
screening criterion. The Director, Office of Nuclear Reactor 
Regulation, will consider factors significantly affecting the potential 
for failure of the reactor vessel in reaching a decision.
    (6) If the Director, Office of Nuclear Reactor Regulation, 
concludes, pursuant to paragraph (b)(5) of this section, that operation 
of the facility with RTPTS in excess of the PTS screening 
criterion cannot be approved on the basis of the licensee's analyses 
submitted in accordance with paragraphs (b)(3) and (b)(4) of this 
section, the licensee shall request and receive approval by the 
Director, Office of Nuclear Reactor Regulation, prior to any operation 
beyond the criterion. The request must be based upon modifications to 
equipment, systems, and operation of the facility in addition to those 
previously proposed in the submitted analyses that would reduce the 
potential for failure of the reactor vessel due to PTS events, or upon 
further analyses based upon new information or improved methodology.
    (7) If the limiting RTPTS value of the plant is projected to 
exceed the screening criteria in paragraph (b)(2), or the criteria in 
paragraphs (b)(3) through (b)(6) of this section cannot be satisfied, 
the reactor vessel beltline may be given a thermal annealing treatment 
to recover the fracture toughness of the material, subject to the 
requirements of Sec. 50.66. The reactor vessel may continue to be 
operated only for that service period within which the predicted 
fracture toughness of the vessel beltline materials satisfy the 
requirements of paragraphs (b)(2) through (b)(6) of this section, with 
RTPTS accounting for the effects of annealing and subsequent 
irradiation.
    (c) Calculation of RTPTS. RTPTS must be calculated for 
each vessel beltline material using a fluence value, f, which is the 
EOL fluence for the material. RTPTS must be evaluated using the 
same procedures used to calculate RTNDT, as indicated in paragraph 
(c)(1) of this section, and as provided in paragraphs (c)(2) and (c)(3) 
of this section.
    (1) Equation 1 must be used to calculate values of RTNDT for 
each weld and plate, or forging, in the reactor vessel beltline.

Equation 1: RTNDT=RTNDT(U)+M+RTNDT

    (i) If a measured value of RTNDT(U) is not available, a 
generic mean value for the class 3 of material may be used if 
there are sufficient test results to establish a mean and a standard 
deviation for the class.

    \3\ The class of material for estimating RTNDT(U) is 
generally determined for welds by the type of welding flux (Linde 
80, or other), and for base metal by the material specification.
---------------------------------------------------------------------------

    (ii) For generic values of weld metal, the following generic mean 
values must be used unless justification for different values is 
provided: 0 deg.F for welds made with Linde 80 flux, and -56 deg.F for 
welds made with Linde 0091, 1092 and 124 and ARCOS B-5 weld fluxes.
    (iii) M means the margin to be added to account for uncertainties 
in the values of RTNDT(U), copper and nickel contents, fluence and 
the calculational procedures. M is evaluated from Equation 2.
[GRAPHIC][TIFF OMITTED]TR19DE95.003

    (A) In Equation 2, U is the standard deviation for 
RTNDT(U). If a measured value of RTNDT(U) is used, then 
U is determined from the precision of the test method. If 
a measured value of RTNDT(U) is not available and a generic mean 
value for that class of materials is used, then U is the 
standard deviation obtained from the set of data used to establish the 
mean. If a generic mean value given in paragraph (c)(1)(i)(B) of this 
section for welds is used, then U is 17 deg.F.
    (B) In Equation 2,  is the standard deviation for 
RTNDT. The value of  to be used is 
28 deg.F for welds and 17 deg.F for base metal; the value of 
 need not exceed one-half of RTNDT.
    (iv) RTNDT is the mean value of the transition 
temperature shift, or change in RTNDT, due to irradiation, and 
must be calculated using Equation 3.

Equation 3: RTNDT=(CF)f(0.28-0.10 log f)

    (A) CF ( deg.F) is the chemistry factor, which is a function of 
copper and nickel content. CF is given in Table 1 for welds and in 
Table 2 for base metal (plates and forgings). Linear interpolation is 
permitted. In Tables 1 and 2, ``Wt-% copper'' and ``Wt-% nickel'' are 
the best-estimate values for the material, which will normally be the 
mean of the measured values for a plate or forging. For a weld, the 
best estimate values will normally be the mean of the measured values 
for a weld deposit made using the same weld wire heat number as the 
critical vessel weld. If these values are not available, the upper 
limiting values given in the material specifications to which the 
vessel material was fabricated may be used. If not available, 
conservative estimates (mean plus one standard deviation) based on 
generic data 4 may be used if justification is provided. If none 
of these alternatives are available, 0.35% copper and 1.0% nickel must 
be assumed.

    \4\ Data from reactor vessels fabricated to the same material 
specification in the same shop as the vessel in question and in the 
same time period is an example of ``generic data.''
---------------------------------------------------------------------------

    (B) f is the best estimate neutron fluence, in units of 1019 
n/cm2 (E greater than 1 MeV), at the clad-base-metal interface on 
the inside surface of the vessel at the location where the material in 
question receives the highest fluence for the period of service in 
question. As specified in this paragraph, the EOL fluence for the 
vessel beltline material is used in calculating KRTPTS.
    (v) Equation 4 must be used for determining RTPTS using 
equation 3 with EOL fluence values for determining RTPTS.

Equation 4: RTPTS=RTNDT(U)+M+RTPTS

    (2) To verify that RTNDT for each vessel beltline material is 
a bounding value for the specific reactor vessel, licensees shall 
consider plant-specific information that could affect the level of 

[[Page 65470]]
embrittlement. This information includes but is not limited to the 
reactor vessel operating temperature and any related surveillance 
program 5 results.

    \5\ Surveillance program results means any data that 
demonstrates the embrittlement trends for the limiting beltline 
material, including but not limited to data from test reactors or 
from surveillance programs at other plants with or without 
surveillance program integrated per 10 CFR Part 50, Appendix H.
---------------------------------------------------------------------------

    (i) Results from the plant-specific surveillance program must be 
integrated into the RTNDT estimate if the plant-specific 
surveillance data has been deemed credible as judged by the following 
criteria:
    (A) The materials in the surveillance capsules must be those which 
are the controlling materials with regard to radiation embrittlement.
    (B) Scatter in the plots of Charpy energy versus temperature for 
the irradiated and unirradiated conditions must be small enough to 
permit the determination of the 30-foot-pound temperature 
unambiguously.
    (C) Where there are two or more sets of surveillance data from one 
reactor, the scatter of RTNDT values must be less than 
28 deg.F for welds and 17 deg.F for base metal. Even if the range in 
the capsule fluences is large (two or more orders of magnitude), the 
scatter may not exceed twice those values.
    (D) The irradiation temperature of the Charpy specimens in the 
capsule must equal the vessel wall temperature at the cladding/base 
metal interface within 25 deg.F.
    (E) The surveillance data for the correlation monitor material in 
the capsule, if present, must fall within the scatter band of the data 
base for the material.
    (ii)(A) Surveillance data deemed credible according to the criteria 
of paragraph (c)(2)(i) of this section must be used to determine a 
material-specific value of CF for use in Equation 3. A material-
specific value of CF is determined from Equation 5.
[GRAPHIC][TIFF OMITTED]TR19DE95.004

    (B) In Equation 5, ``n'' is the number of surveillance data points, 
``Ai'' is the measured value of RTNDT and 
``fi'' is the fluence for each surveillance data point. If there 
is clear evidence that the copper and nickel content of the 
surveillance weld differs from the vessel weld, i.e. differs from the 
average for the weld wire heat number associated with the vessel weld 
and the surveillance weld, the measured values of RTNDT 
must be adjusted for differences in copper and nickel content by 
multiplying them by the ratio of the chemistry factor for the vessel 
material to that for the surveillance weld.
    (iii) For cases in which the results from a credible plant-specific 
surveillance program are used, the value of  to be 
used is 14 deg.F for welds and 8.5 deg.F for base metal; the value of 
 need not exceed one-half of DRTNDT.
    (iv) The use of results from the plant-specific surveillance 
program may result in an RTNDT that is higher or lower than those 
determined in paragraph (c)(1).
    (3) Any information that is believed to improve the accuracy of the 
RTPTS value significantly must be reported to the Director, Office 
of Nuclear Reactor Regulation. Any value of RTPTS that has been 
modified using the procedures of paragraph (c)(2) of this section is 
subject to the approval of the Director, Office of Nuclear Reactor 
Regulation, when used as provided in this section.

                               Table 1.--Chemistry Factor for Weld Metals,  deg.F                               
----------------------------------------------------------------------------------------------------------------
                                                                        Nickel, wt-%                            
               Copper, wt-%                ---------------------------------------------------------------------
                                                0       0.20      0.40      0.60      0.80      1.00      1.20  
----------------------------------------------------------------------------------------------------------------
0.........................................        20        20        20        20        20        20        20
0.01......................................        20        20        20        20        20        20        20
0.02......................................        21        26        27        27        27        27        27
0.03......................................        22        35        41        41        41        41        41
0.04......................................        24        43        54        54        54        54        54
0.05......................................        26        49        67        68        68        68        68
0.06......................................        29        52        77        82        82        82        82
0.07......................................        32        55        85        95        95        95        95
0.08......................................        36        58        90       106       108       108       108
0.09......................................        40        61        94       115       122       122       122
0.10......................................        44        65        97       122       133       135       135
0.11......................................        49        68       101       130       144       148       148
0.12......................................        52        72       103       135       153       161       161
0.13......................................        58        76       106       139       162       172       176
0.14......................................        61        79       109       142       168       182       188
0.15......................................        66        84       112       146       175       191       200
0.16......................................        70        88       115       149       178       199       211
0.17......................................        75        92       119       151       184       207       221
0.18......................................        79        95       122       154       187       214       230
0.19......................................        83       100       126       157       191       220       238
0.20......................................        88       104       129       160       194       223       245
0.21......................................        92       108       133       164       197       229       252

[[Page 65471]]
                                                                                                                
0.22......................................        97       112       137       167       200       232       257
0.23......................................       101       117       140       169       203       236       263
0.24......................................       105       121       144       173       206       239       268
0.25......................................       110       126       148       176       209       243       272
0.26......................................       113       130       151       180       212       246       276
0.27......................................       119       134       155       184       216       249       280
0.28......................................       122       138       160       187       218       251       284
0.29......................................       128       142       164       191       222       254       287
0.30......................................       131       146       167       194       225       257       290
0.31......................................       136       151       172       198       228       260       293
0.32......................................       140       155       175       202       231       263       296
0.33......................................       144       160       180       205       234       266       299
0.34......................................       149       164       184       209       238       269       302
0.35......................................       153       168       187       212       241       272       305
0.36......................................       158       172       191       216       245       275       308
0.37......................................       162       177       196       220       248       278       311
0.38......................................       166       182       200       223       250       281       314
0.39......................................       171       185       203       227       254       285       317
0.40......................................       175       189       207       231       257       288       320
----------------------------------------------------------------------------------------------------------------

                               Table 2.--Chemistry Factor for Base Metals,  deg.F                               
----------------------------------------------------------------------------------------------------------------
                                                                        Nickel, wt-%                            
               Copper, wt-%                ---------------------------------------------------------------------
                                                0       0.20      0.40      0.60      0.80      1.00      1.20  
----------------------------------------------------------------------------------------------------------------
0.........................................        20        20        20        20        20        20        20
0.01......................................        20        20        20        20        20        20        20
0.02......................................        20        20        20        20        20        20        20
0.03......................................        20        20        20        20        20        20        20
0.04......................................        22        26        26        26        26        26        26
0.05......................................        25        31        31        31        31        31        31
0.06......................................        28        37        37        37        37        37        37
0.07......................................        31        43        44        44        44        44        44
0.08......................................        34        48        51        51        51        51        51
0.09......................................        37        53        58        58        58        58        58
0.10......................................        41        58        65        65        67        67        67
0.11......................................        45        62        72        74        77        77        77
0.12......................................        49        67        79        83        86        86        86
0.13......................................        53        71        85        91        96        96        96
0.14......................................        57        75        91       100       105       106       106
0.15......................................        61        80        99       110       115       117       117
0.16......................................        65        84       104       118       123       125       125
0.17......................................        69        88       110       127       132       135       135
0.18......................................        73        92       115       134       141       144       144
0.19......................................        78        97       120       142       150       154       154
0.20......................................        82       102       125       149       159       164       165
0.21......................................        86       107       129       155       167       172       174
0.22......................................        91       112       134       161       176       181       184
0.23......................................        95       117       138       167       184       190       194
0.24......................................       100       121       143       172       191       199       204
0.25......................................       104       126       148       176       199       208       214
0.26......................................       109       130       151       180       205       216       221
0.27......................................       114       134       155       184       211       225       230
0.28......................................       119       138       160       187       216       233       239
0.29......................................       124       142       164       191       221       241       248
0.30......................................       129       146       167       194       225       249       257
0.31......................................       134       151       172       198       228       255       266
0.32......................................       139       155       175       202       231       260       274
0.33......................................       144       160       180       205       234       264       282
0.34......................................       149       164       184       209       238       268       290
0.35......................................       153       168       187       212       241       272       298
0.36......................................       158       173       191       216       245       275       303
0.37......................................       162       177       196       220       248       278       308
0.38......................................       166       182       200       223       250       281       313
0.39......................................       171       185       203       227       254       285       317
0.40......................................       175       189       207       231       257       288       320
----------------------------------------------------------------------------------------------------------------

[[Page 65472]]

    4. A new Sec. 50.66 is added under the center heading ``Issuance, 
Limitations, and Conditions of Licenses and Construction Permits'' to 
read as follows:

Sec. 50.66  Requirements for thermal annealing of the reactor pressure 
vessel.

    (a) For those light water nuclear power reactors where neutron 
radiation has reduced the fracture toughness of the reactor vessel 
materials, a thermal annealing may be applied to the reactor vessel to 
recover the fracture toughness of the material. The use of a thermal 
annealing treatment is subject to the requirements in this section. A 
report describing the licensee's plan for conducting the thermal 
annealing must be submitted in accordance with Sec. 50.4 at least three 
years prior to the date at which the limiting fracture toughness 
criteria in Sec. 50.61 or Appendix G to Part 50 would be exceeded. 
Within three years of the submittal of the Thermal Annealing Report and 
at least thirty days prior to the start of the thermal annealing, the 
NRC will review the Thermal Annealing Report and place the results of 
its evaluation in its Public Document Room. The licensee may begin the 
thermal anneal after:
    (1) Submitting the Thermal Annealing Report required by paragraph 
(b) of this section;
    (2) the NRC places the results of its evaluation of the Thermal 
Annealing Report in the Public Document Room; and
    (3) the requirements of paragraph (f)(1) of this section have been 
satisfied.
    (b) Thermal Annealing Report. The Thermal Annealing Report must 
include: a Thermal Annealing Operating Plan; a Requalification 
Inspection and Test Program; a Fracture Toughness Recovery and 
Reembrittlement Trend Assurance Program; and Identification of 
Unreviewed Safety Questions and Technical Specification Changes.
    (1) Thermal Annealing Operating Plan.
    The thermal annealing operating plan must include:
    (i) A detailed description of the pressure vessel and all 
structures and components that are expected to experience significant 
thermal or stress effects during the thermal annealing operation;
    (ii) An evaluation of the effects of mechanical and thermal 
stresses and temperatures on the vessel, containment, biological 
shield, attached piping and appurtenances, and adjacent equipment and 
components to demonstrate that operability of the reactor will not be 
detrimentally affected. This evaluation must include:
    (A) Detailed thermal and structural analyses to establish the time 
and temperature profile of the annealing operation. These analyses must 
include heatup and cooldown rates, and must demonstrate that localized 
temperatures, thermal stress gradients, and subsequent residual 
stresses will not result in unacceptable dimensional changes or 
distortions in the vessel, attached piping and appurtenances, and that 
the thermal annealing cycle will not result in unacceptable degradation 
of the fatigue life of these components.
    (B) The effects of localized high temperatures on degradation of 
the concrete adjacent to the vessel and changes in thermal and 
mechanical properties, if any, of the reactor vessel insulation, and on 
detrimental effects, if any, on containment and the biological shield. 
If the design temperature limitations for the adjacent concrete 
structure are to be exceeded during the thermal annealing operation, an 
acceptable maximum temperature for the concrete must be established for 
the annealing operation using appropriate test data.
    (iii) The methods, including heat source, instrumentation and 
procedures proposed for performing the thermal annealing. This shall 
include any special precautions necessary to minimize occupational 
exposure, in accordance with the As Low As Reasonably Achievable 
(ALARA) principle and the provisions of Sec. 20.1206.
    (iv) The proposed thermal annealing operating parameters, including 
bounding conditions for temperatures and times, and heatup and cooldown 
schedules.
    (A) The thermal annealing time and temperature parameters selected 
must be based on projecting sufficient recovery of fracture toughness, 
using the procedures of paragraph (e) of this section, to satisfy the 
requirements of Sec. 50.60 and Sec. 50.61 for the proposed period of 
operation addressed in the application.
    (B) The time and temperature parameters evaluated as part of the 
thermal annealing operating plan, and supported by the evaluation 
results of paragraph (b)(1)(ii) of this section, represent the bounding 
times and temperatures for the thermal annealing operation. If these 
bounding conditions for times and temperatures are violated during the 
thermal annealing operation, then the annealing operation is considered 
not in accordance with the Thermal Annealing Operating Plan, as 
required by paragraph (c)(1) of this section, and the licensee must 
comply with paragraph (c)(2) of this section.
    (2) Requalification Inspection and Test Program. The inspection and 
test program to requalify the annealed reactor vessel must include the 
detailed monitoring, inspections, and tests proposed to demonstrate 
that the limitations on temperatures, times and temperature profiles, 
and stresses evaluated for the proposed thermal annealing conditions of 
paragraph (b)(1)(iv) of this section have not been exceeded, and to 
determine the thermal annealing time and temperature to be used in 
quantifying the fracture toughness recovery. The requalification 
inspection and test program must demonstrate that the thermal annealing 
operation has not degraded the reactor vessel, attached piping or 
appurtenances, or the adjacent concrete structures to a degree that 
could affect the safe operation of the reactor.
    (3) Fracture Toughness Recovery and Reembrittlement Trend Assurance 
Program. The percent recovery of RTNDT and Charpy upper-shelf 
energy due to the thermal annealing treatment must be determined based 
on the time and temperature of the actual vessel thermal anneal. The 
recovery of RTNDT and Charpy upper-shelf energy provide the basis 
for establishing the post-anneal RTNDT and Charpy upper-shelf 
energy for each vessel material. Changes in the RTNDT and Charpy 
upper-shelf energy with subsequent plant operation must be determined 
using the post-anneal values of these parameters in conjunction with 
the projected reembrittlement trend determined in accordance with 
paragraph (b)(3)(ii) of this section. Recovery and reembrittlement 
evaluations shall include:
    (i) Recovery Evaluations.
    (A) The percent recovery of both RTNDT and Charpy upper-shelf 
energy must be determined by one of the procedures described in 
paragraph (e) of this section, using the proposed lower bound thermal 
annealing time and temperature conditions described in the operating 
plan.
    (B) If the percent recovery is determined from testing surveillance 
specimens or from testing materials removed from the reactor vessel, 
then it shall be demonstrated that the proposed thermal annealing 
parameters used in the test program are equal to or bounded by those 
used in the vessel annealing operation.
    (C) If generic computational methods are used, appropriate 
justification must be submitted as a part of the application.
    (ii) Reembrittlement Evaluations.
    (A) The projected post-anneal reembrittlement of RTNDT must be 

[[Page 65473]]
calculated using the procedures in Sec. 50.61(c), or must be determined 
using the same basis as that used for the pre-anneal operating period. 
The projected change due to post-anneal reembrittlement for Charpy 
upper-shelf energy must be determined using the same basis as that used 
for the pre-anneal operating period.
    (B) The post-anneal reembrittlement trend of both RTNDT and 
Charpy upper-shelf energy must be estimated, and must be monitored 
using a surveillance program defined in the Thermal Annealing Report 
and which conforms to the intent of Appendix H of this part, ``Reactor 
Vessel Material Surveillance Program Requirements.''
    (4) Identification of Unreviewed Safety Questions and Technical 
Specification Changes. Any changes to the facility as described in the 
updated final safety analysis report constituting unreviewed safety 
questions, and any changes to the technical specifications, which are 
necessary to either conduct the thermal annealing or operate the 
nuclear power reactor following the annealing, must be identified. The 
section shall demonstrate that the Commission's requirements continue 
to be complied with, and that there is reasonable assurance of adequate 
protection to the public health and safety following the changes.
    (c) Completion or Termination of Thermal Annealing.
    (1) If the thermal annealing was completed in accordance with the 
Thermal Annealing Operating Plan and the Requalification Inspection and 
Test Program, the licensee shall so confirm in writing to the Director, 
Office of Nuclear Reactor Regulation. The licensee may restart its 
reactor after the requirements of paragraph (f)(2) of this section have 
been met.
    (2) If the thermal annealing was completed but the annealing was 
not performed in accordance with the Thermal Annealing Operating Plan 
and the Requalification Inspection and Test Program, the licensee shall 
submit a summary of lack of compliance with the Thermal Annealing 
Operating Plan and the Requalification Inspection and Test Program and 
a justification for subsequent operation to the Director, Office of 
Nuclear Reactor Regulation. Any changes to the facility as described in 
the updated final safety analysis report which are attributable to the 
noncompliances and constitute unreviewed safety questions, and any 
changes to the technical specifications which are required as a result 
of the noncompliances, shall also be identified.
    (i) If no unreviewed safety questions or changes to technical 
specifications are identified, the licensee may restart its reactor 
after the requirements of paragraph (f)(2) of this section have been 
met.
    (ii) If any unreviewed safety questions or changes to technical 
specifications are identified, the licensee may not restart its reactor 
until approval is obtained from the Director, Office of Nuclear Reactor 
Regulation and the requirements of paragraph (f)(2) of this section 
have been met.
    (3) If the thermal annealing was terminated prior to completion, 
the licensee shall immediately notify the NRC of the premature 
termination of the thermal anneal.
    (i) If the partial annealing was otherwise performed in accordance 
with the Thermal Annealing Operating Plan and relevant portions of the 
Requalification Inspection and Test Program, and the licensee does not 
elect to take credit for any recovery, the licensee need not submit the 
Thermal Annealing Results Report required by paragraph (d) of this 
section but instead shall confirm in writing to the Director, Office of 
Nuclear Reactor Regulation that the partial annealing was otherwise 
performed in accordance with the Thermal Annealing Operating Plan and 
relevant portions of the Requalification Inspection and Test Program. 
The licensee may restart its reactor after the requirements of 
paragraph (f)(2) of this section have been met.
    (ii) If the partial annealing was otherwise performed in accordance 
with the Thermal Annealing Operating Plan and relevant portions of the 
Requalification Inspection and Test Program, and the licensee elects to 
take full or partial credit for the partial annealing, the licensee 
shall confirm in writing to the Director, Office of Nuclear Reactor 
Regulation that the partial annealing was otherwise performed in 
compliance with the Thermal Annealing Operating Plan and relevant 
portions of the Requalification Inspection and Test Program. The 
licensee may restart its reactor after the requirements of paragraph 
(f)(2) of this section have been met.
    (iii) If the partial annealing was not performed in accordance with 
the Thermal Annealing Operating Plan and relevant portions of the 
Requalification Inspection and Test Program, the licensee shall submit 
a summary of lack of compliance with the Thermal Annealing Operating 
Plan and the Requalification Inspection and Test Program and a 
justification for subsequent operation to the Director, Office of 
Nuclear Reactor Regulation. Any changes to the facility as described in 
the updated final safety analysis report which are attributable to the 
noncompliances and constitute unreviewed safety questions, and any 
changes to the technical specifications which are required as a result 
of the noncompliances, shall also be identified.
    (A) If no unreviewed safety questions or changes to technical 
specifications are identified, the licensee may restart its reactor 
after the requirements of paragraph (f)(2) of this section have been 
met.
    (B) If any unreviewed safety questions or changes to technical 
specifications are identified, the licensee may not restart its reactor 
until approval is obtained from the Director, Office of Nuclear Reactor 
Regulation and the requirements of paragraph (f)(2) of this section 
have been met.
    (d) Thermal Annealing Results Report. Every licensee that either 
completes a thermal annealing, or that terminates an annealing but 
elects to take full or partial credit for the annealing, shall provide 
the following information within three months of completing the thermal 
anneal, unless an extension is authorized by the Director, Office of 
Nuclear Reactor Regulation:
    (1) The time and temperature profiles of the actual thermal 
annealing;
    (2) The post-anneal RTNDT and Charpy upper-shelf energy values 
of the reactor vessel materials for use in subsequent reactor 
operation;
    (3) The projected post-anneal reembrittlement trends for both 
RTNDT and Charpy upper-shelf energy; and
    (4) The projected values of RTPTS and Charpy upper-shelf 
energy at the end of the proposed period of operation addressed in the 
Thermal Annealing Report.
    (e) Procedures for Determining the Recovery of Fracture Toughness. 
The procedures of this paragraph must be used to determine the percent 
recovery of RTNDT, Rt, and percent recovery of 
Charpy upper-shelf energy, Ru. In all cases, Rt and Ru 
may not exceed 100.
    (1) For those reactors with surveillance programs which have 
developed credible surveillance data as defined in Sec. 50.61, percent 
recovery due to thermal annealing (Rt and Ru) must be 
evaluated by testing surveillance specimens that have been withdrawn 
from the surveillance program and that have been annealed under the 
same time and temperature conditions as those given the beltline 
material.
    (2) Alternatively, the percent recovery due to thermal annealing 
(Rt and Ru) may be determined from the results of 

[[Page 65474]]
a verification test program employing materials removed from the 
beltline region of the reactor vessel 6 and that have been 
annealed under the same time and temperature conditions as those given 
the beltline material.

    \6\ For those cases where materials are removed from the 
beltline of the pressure vessel, the stress limits of the applicable 
portions of the ASME Code Section III must be satisfied, including 
consideration of fatigue and corrosion, regardless of the Code of 
record for the vessel design.
---------------------------------------------------------------------------

    (3) Generic computational methods may be used to determine recovery 
if adequate justification is provided.
    (f) Public information and participation.
    (1) Upon receipt of a Thermal Annealing Report, and a minimum of 30 
days before the licensee starts thermal annealing, the Commission 
shall:
    (i) Notify and solicit comments from local and State governments in 
the vicinity of the site where the thermal annealing will take place 
and any Indian Nation or other indigenous people that have treaty or 
statutory rights that could be affected by the thermal annealing,
    (ii) Publish a notice of a public meeting in the Federal Register 
and in a forum, such as local newspapers, which is readily accessible 
to individuals in the vicinity of the site, to solicit comments from 
the public, and
    (iii) Hold a public meeting on the licensee's Thermal Annealing 
Report.
    (2) Within 15 days after the NRC's receipt of the licensee 
submissions required by paragraphs (c)(1), (c)(2) and (c)(3)(i)-(iii) 
of this section, the NRC staff shall place in the NRC Public Document 
Room a summary of its inspection of the licensee's thermal annealing, 
and the Commission shall hold a public meeting:
    (i) For the licensee to explain to NRC and the public the results 
of the reactor pressure vessel annealing,
    (ii) for the NRC to discuss its inspection of the reactor vessel 
annealing, and
    (iii) for the NRC to receive public comments on the annealing.
    (3) Within 45 days of NRC's receipt of the licensee submissions 
required by paragraphs (c)(1), (c)(2) and (c)(3)(i)-(iii) of this 
section, the NRC staff shall complete full documentation of its 
inspection of the licensee's annealing process and place this 
documentation in the NRC Public Document Room.
    5. In 10 CFR Part 50, Appendix G is revised to read as follows:

Appendix G to Part 50--Fracture Toughness Requirements

I. Introduction and scope.
II. Definitions.
III. Fracture toughness tests.
IV. Fracture toughness requirements.

I. Introduction and Scope

    This appendix specifies fracture toughness requirements for 
ferritic materials of pressure-retaining components of the reactor 
coolant pressure boundary of light water nuclear power reactors to 
provide adequate margins of safety during any condition of normal 
operation, including anticipated operational occurrences and system 
hydrostatic tests, to which the pressure boundary may be subjected 
over its service lifetime.
    The ASME Code forms the basis for the requirements of this 
appendix. ``ASME Code'' means the American Society of Mechanical 
Engineers Boiler and Pressure Vessel Code. If no section is 
specified, the reference is to Section III, Division 1, ``Rules for 
Construction of Nuclear Power Plant Components.'' ``Section XI'' 
means Section XI, Division 1, ``Rules for Inservice Inspection of 
Nuclear Power Plant Components.'' If no edition or addenda are 
specified, the ASME Code edition and addenda and any limitations and 
modifications thereof, which are specified in Sec. 50.55a, are 
applicable.
    The sections, editions and addenda of the ASME Boiler and 
Pressure Vessel Code specified in Sec. 50.55a have been approved for 
incorporation by reference by the Director of the Federal Register. 
A notice of any changes made to the material incorporated by 
reference will be published in the Federal Register. Copies of the 
ASME Boiler and Pressure Vessel Code may be purchased from the 
American Society of Mechanical Engineers, United Engineering Center, 
345 East 47th Street, New York, NY 10017, and are available for 
inspection at the NRC Library, 11545 Rockville Pike, Two White Flint 
North, Rockville, MD 20852-2738.
    The requirements of this appendix apply to the following 
materials:
    A. Carbon and low-alloy ferritic steel plate, forgings, 
castings, and pipe with specified minimum yield strengths not over 
50,000 psi (345 MPa), and to those with specified minimum yield 
strengths greater than 50,000 psi (345 MPa) but not over 90,000 psi 
(621 MPa) if qualified by using methods equivalent to those 
described in paragraph G-2110 of Appendix G of Section XI of the 
latest edition and addenda of the ASME Code incorporated by 
reference into Sec. 50.55a(b)(2).
    B. Welds and weld heat-affected zones in the materials specified 
in paragraph I.A. of this appendix.
    C. Materials for bolting and other types of fasteners with 
specified minimum yield strengths not over 130,000 psi (896 MPa).

    Note: The adequacy of the fracture toughness of other ferritic 
materials not covered in this section must be demonstrated to the 
Director, Office of Nuclear Reactor Regulation, on an individual 
case basis.

II. Definitions

    A. Ferritic material means carbon and low-alloy steels, higher 
alloy steels including all stainless alloys of the 4xx series, and 
maraging and precipitation hardening steels with a predominantly 
body-centered cubic crystal structure.
    B. System hydrostatic tests means all preoperational system 
leakage and hydrostatic pressure tests and all system leakage and 
hydrostatic pressure tests performed during the service life of the 
pressure boundary in compliance with the ASME Code, Section XI.
    C. Specified minimum yield strength means the minimum yield 
strength (in the unirradiated condition) of a material specified in 
the construction code under which the component is built under 
Sec. 50.55a.
    D. RTNDT means the reference temperature of the material, 
for all conditions.
    (i) For the pre-service or unirradiated condition, RTNDT is 
evaluated according to the procedures in the ASME Code, Paragraph 
NB-2331.
    (ii) For the reactor vessel beltline materials, RTNDT must 
account for the effects of neutron radiation.
    E. RTNDT means the transition temperature shift, or change 
in RTNDT, due to neutron radiation effects, which is evaluated 
as the difference in the 30 ft-lb (41 J) index temperatures from the 
average Charpy curves measured before and after irradiation.
    F. Beltline or Beltline region of reactor vessel means the 
region of the reactor vessel (shell material including welds, heat 
affected zones, and plates or forgings) that directly surrounds the 
effective height of the active core and adjacent regions of the 
reactor vessel that are predicted to experience sufficient neutron 
radiation damage to be considered in the selection of the most 
limiting material with regard to radiation damage.

III. Fracture Toughness Tests

    A. To demonstrate compliance with the fracture toughness 
requirements of Section IV of this appendix, ferritic materials must 
be tested in accordance with the ASME Code and, for the beltline 
materials, the test requirements of Appendix H of this part. For a 
reactor vessel that was constructed to an ASME Code earlier than the 
Summer 1972 Addenda of the 1971 Edition (under Sec. 50.55a), the 
fracture toughness data and data analyses must be supplemented in a 
manner approved by the Director, Office of Nuclear Reactor 
Regulation, to demonstrate equivalence with the fracture toughness 
requirements of this appendix.
    B. Test methods for supplemental fracture toughness tests 
described in paragraph IV.A.1.b of this appendix must be submitted 
to and approved by the Director, Office of Nuclear Reactor 
Regulation, prior to testing.
    C. All fracture toughness test programs conducted in accordance 
with paragraphs III.A and III.B must comply with ASME Code 
requirements for calibration of test equipment, qualification of 
test personnel, and retention of records of these functions and of 
the test data.

IV. Fracture Toughness Requirements

    A. The pressure-retaining components of the reactor coolant 
pressure boundary that are made of ferritic materials must meet the 
requirements of the ASME Code, supplemented by the additional 
requirements set forth below, for fracture toughness during system 
hydrostatic tests and any condition of 

[[Page 65475]]
normal operation, including anticipated operational occurrences. 
Reactor vessels may continue to be operated only for that service 
period within which the requirements of this section are satisfied. 
For the reactor vessel beltline materials, including welds, plates 
and forgings, the values of RTNDT and Charpy upper-shelf energy 
must account for the effects of neutron radiation, including the 
results of the surveillance program of Appendix H of this part. The 
effects of neutron radiation must consider the radiation conditions 
(i.e., the fluence) at the deepest point on the crack front of the 
flaw assumed in the analysis.

1. Reactor Vessel Charpy Upper-Shelf Energy Requirements

    a. Reactor vessel beltline materials must have Charpy upper-
shelf energy,1 in the transverse direction for base material 
and along the weld for weld material according to the ASME Code, of 
no less than 75 ft-lb (102 J) initially and must maintain Charpy 
upper-shelf energy throughout the life of the vessel of no less than 
50 ft-lb (68 J), unless it is demonstrated in a manner approved by 
the Director, Office of Nuclear Reactor Regulation, that lower 
values of Charpy upper-shelf energy will provide margins of safety 
against fracture equivalent to those required by Appendix G of 
Section XI of the ASME Code. This analysis must use the latest 
edition and addenda of the ASME Code incorporated by reference into 
Sec. 50.55a(b)(2) at the time the analysis is submitted.

    \1\ Defined in ASTM E 185-79 and -82 which are incorporated by 
reference in Appendix H to Part 50.
---------------------------------------------------------------------------

    b. Additional evidence of the fracture toughness of the beltline 
materials after exposure to neutron irradiation may be obtained from 
results of supplemental fracture toughness tests for use in the 
analysis specified in section IV.A.1.a.
    c. The analysis for satisfying the requirements of section 
IV.A.1 of this appendix must be submitted, as specified in 
Sec. 50.4, for review and approval on an individual case basis at 
least three years prior to the date when the predicted Charpy upper-
shelf energy will no longer satisfy the requirements of section 
IV.A.1 of this appendix, or on a schedule approved by the Director, 
Office of Nuclear Reactor Regulation.

2. Pressure-Temperature Limits and Minimum Temperature Requirements

    a. Pressure-temperature limits and minimum temperature 
requirements for the reactor vessel are given in Table 3, and are 
defined by the operating condition (i.e., hydrostatic pressure and 
leak tests, or normal operation including anticipated operational 
occurrences), the vessel pressure, whether or not fuel is in the 
vessel, and whether the core is critical. In Table 3, the vessel 
pressure is defined as a percentage of the preservice system 
hydrostatic test pressure. The appropriate requirements on both the 
pressure-temperature limits and the minimum permissible temperature 
must be met for all conditions.
    b. The pressure-temperature limits identified as ``ASME Appendix 
G limits'' in Table 3 require that the limits must be at least as 
conservative as limits obtained by following the methods of analysis 
and the margins of safety of Appendix G of Section XI of the ASME 
Code.
    c. The minimum temperature requirements given in Table 3 pertain 
to the controlling material, which is either the material in the 
closure flange or the material in the beltline region with the 
highest reference temperature. As specified in Table 3, the minimum 
temperature requirements and the controlling material depend on the 
operating condition (i.e., hydrostatic pressure and leak tests, or 
normal operation including anticipated operational occurrences), the 
vessel pressure, whether fuel is in the vessel, and whether the core 
is critical. The metal temperature of the controlling material, in 
the region of the controlling material which has the least favorable 
combination of stress and temperature, must exceed the appropriate 
minimum temperature requirement for the condition and pressure of 
the vessel specified in Table 1.
    d. Pressure tests and leak tests of the reactor vessel that are 
required by Section XI of the ASME Code must be completed before the 
core is critical.
    B. If the procedures of Section IV.A. of this appendix do not 
indicate the existence of an equivalent safety margin, the reactor 
vessel beltline may be given a thermal annealing treatment to 
recover the fracture toughness of the material, subject to the 
requirements of Sec. 50.66. The reactor vessel may continue to be 
operated only for that service period within which the predicted 
fracture toughness of the beltline region materials satisfies the 
requirements of Section IV.A. of this appendix using the values of 
RTNDT and Charpy upper-shelf energy that include the effects of 
annealing and subsequent irradiation.

                 Table 1.--Pressure and Temperature Requirements for the Reactor Pressure Vessel                
----------------------------------------------------------------------------------------------------------------
                                          Vessel    Requirements for pressure-                                  
         Operating condition             pressure       temperature limits      Minimum temperature requirements
-------------------------------------------\1\------------------------------------------------------------------
1. Hydrostatic pressure and leak                                                                                
 tests (core is not critical):                                                                                  
    1.a  Fuel in the vessel..........    ASME Appendix G Limits....  (\2\)                           
                                               20%                                                              
    1.b  Fuel in the vessel..........         >20%  ASME Appendix G Limits....  (\2\) +90 deg.F (\6\)           
    1.c  No fuel in the vessel                 ALL  (Not Applicable)..........  (\3\) +60 deg.F                 
     (Preservice Hydrotest Only).                                                                               
2. Normal operation (incl. heat-up                                                                              
 and cool-down), including                                                                                      
 anticipated operational occurrences:                                                                           
    2.a  Core not critical...........    ASME Appendix G Limits....  (\2\)                           
                                               20%                                                              
    2.b  Core not critical...........         >20%  ASME Appendix G Limits....  (\2\) +120 deg.F (\6\)          
    2.c  Core critical...............    ASME Appendix G Limits +    Larger of [(\4\)] or [(\2\) + 40
                                               20%   40 deg.F.                   deg.F]                         
    2.d  Core critical...............         >20%  ASME Appendix G Limits +    Larger of [(\4\)] or [(\2\) +   
                                                     40 deg.F.                   160 deg.F]                     
    2.e  Core critical for BWR (\5\).    ASME Appendix G Limits +    (\2\) + 60 deg.F                
                                               20%   40 deg.F.                                                  
----------------------------------------------------------------------------------------------------------------
\1\ Percent of the preservice system hydrostatic test pressure.                                                 
\2\ The highest reference temperature of the material in the closure flange region that is highly stressed by   
  the bolt preload.                                                                                             
\3\ The highest reference temperature of the vessel.                                                            
\4\ The minimum permissible temperature for the inservice system hydrostatic pressure test.                     
\5\ For boiling water reactors (BWR) with water level within the normal range for power operation.              
\6\ Lower temperatures are permissible if they can be justified by showing that the margins of safety of the    
  controlling region are equivalent to those required for the beltline when it is controlling.                  

[[Page 65476]]

    6. In 10 CFR Part 50, Appendix H is revised to read as follows:

Appendix H to Part 50--Reactor Vessel Material Surveillance Program 
Requirements

I. Introduction
II. Definitions
III. Surveillance Program Criteria
IV. Report of Test Results

I. Introduction

    The purpose of the material surveillance program required by 
this appendix is to monitor changes in the fracture toughness 
properties of ferritic materials in the reactor vessel beltline 
region of light water nuclear power reactors which result from 
exposure of these materials to neutron irradiation and the thermal 
environment. Under the program, fracture toughness test data are 
obtained from material specimens exposed in surveillance capsules, 
which are withdrawn periodically from the reactor vessel. These data 
will be used as described in Section IV of Appendix G to Part 50.
    ASTM E 185-73, -79, and -82, ``Standard Practice for Conducting 
Surveillance Tests for Light-Water Cooled Nuclear Power Reactor 
Vessels,'' which are referenced in the following paragraphs, have 
been approved for incorporation by reference by the Director of the 
Federal Register. Copies of ASTM E 185-73, -79, and -82, may be 
purchased from the American Society for Testing and Materials, 1916 
Race Street, Philadelphia, PA 19103 and are available for inspection 
at the NRC Library, 11545 Rockville Pike, Two White Flint North, 
Rockville, MD 20852-2738.

II. Definitions

    All terms used in this Appendix have the same meaning as in 
Appendix G.

III. Surveillance Program Criteria

    A. No material surveillance program is required for reactor 
vessels for which it can be conservatively demonstrated by 
analytical methods applied to experimental data and tests performed 
on comparable vessels, making appropriate allowances for all 
uncertainties in the measurements, that the peak neutron fluence at 
the end of the design life of the vessel will not exceed 1017 
n/cm2 (E > 1 MeV).
    B. Reactor vessels that do not meet the conditions of paragraph 
III.A of this appendix must have their beltline materials monitored 
by a surveillance program complying with ASTM E 185, as modified by 
this appendix.
    1. The design of the surveillance program and the withdrawal 
schedule must meet the requirements of the edition of ASTM E 185 
that is current on the issue date of the ASME Code to which the 
reactor vessel was purchased. Later editions of ASTM E 185 may be 
used, but including only those editions through 1982. For each 
capsule withdrawal, the test procedures and reporting requirements 
must meet the requirements of ASTM E 185-82 to the extent 
practicable for the configuration of the specimens in the capsule.
    2. Surveillance specimen capsules must be located near the 
inside vessel wall in the beltline region so that the specimen 
irradiation history duplicates, to the extent practicable within the 
physical constraints of the system, the neutron spectrum, 
temperature history, and maximum neutron fluence experienced by the 
reactor vessel inner surface. If the capsule holders are attached to 
the vessel wall or to the vessel cladding, construction and 
inservice inspection of the attachments and attachment welds must be 
done according to the requirements for permanent structural 
attachments to reactor vessels given in Sections III and XI of the 
American Society of Mechanical Engineers Boiler and Pressure Vessel 
Code (ASME Code). The design and location of the capsule holders 
must permit insertion of replacement capsules. Accelerated 
irradiation capsules may be used in addition to the required number 
of surveillance capsules.
    3. A proposed withdrawal schedule must be submitted with a 
technical justification as specified in Sec. 50.4. The proposed 
schedule must be approved prior to implementation.
    C. Requirements for an Integrated Surveillance Program.
    1. In an integrated surveillance program, the representative 
materials chosen for surveillance for a reactor are irradiated in 
one or more other reactors that have similar design and operating 
features. Integrated surveillance programs must be approved by the 
Director, Office of Nuclear Reactor Regulation, on a case-by-case 
basis. Criteria for approval include the following:
    a. The reactor in which the materials will be irradiated and the 
reactor for which the materials are being irradiated must have 
sufficiently similar design and operating features to permit 
accurate comparisons of the predicted amount of radiation damage.
    b. Each reactor must have an adequate dosimetry program.
    c. There must be adequate arrangement for data sharing between 
plants.
    d. There must be a contingency plan to assure that the 
surveillance program for each reactor will not be jeopardized by 
operation at reduced power level or by an extended outage of another 
reactor from which data are expected.
    e. There must be substantial advantages to be gained, such as 
reduced power outages or reduced personnel exposure to radiation, as 
a direct result of not requiring surveillance capsules in all 
reactors in the set.
    2. No reduction in the requirements for number of materials to 
be irradiated, specimen types, or number of specimens per reactor is 
permitted.
    3. After (the effective date of this section), no reduction in 
the amount of testing is permitted unless previously authorized by 
the Director, Office of Nuclear Reactor Regulation.

IV. Report of Test Results

    A. Each capsule withdrawal and the test results must be the 
subject of a summary technical report to be submitted, as specified 
in Sec. 50.4, within one year of the date of capsule withdrawal, 
unless an extension is granted by the Director, Office of Nuclear 
Reactor Regulation.
    B. The report must include the data required by ASTM E 185, as 
specified in paragraph III.B.1 of this appendix, and the results of 
all fracture toughness tests conducted on the beltline materials in 
the irradiated and unirradiated conditions.
    C. If a change in the Technical Specifications is required, 
either in the pressure-temperature limits or in the operating 
procedures required to meet the limits, the expected date for 
submittal of the revised Technical Specifications must be provided 
with the report.

    Dated at Rockville MD, this 12th day of December, 1995.

    For the Nuclear Regulatory Commission.
John C. Hoyle,
Secretary of the Commission.
[FR Doc. 95-30665 Filed 12-18-95; 8:45 am]
BILLING CODE 7590-01-P

Complete official Federal Register PDF

FR Doc. 95-30593 Official/Unofficial Weighing Service
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65235-65236]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30593]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 60, No. 243 / Tuesday, December 19, 1995 / 
Rules and Regulations

[[Page 65235]]

DEPARTMENT OF AGRICULTURE

Grain Inspection, Packers and Stockyards Administration

7 CFR Part 800

Official/Unofficial Weighing Service

AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Grain Inspection, Packers and Stockyards Administration 
(GIPSA) is amending portions of Part 800, General Regulations under the 
United States Grain Standards Act, as amended (USGSA). The action is 
being taken to reinstate the regulations contained in 7 CFR Part 800 
prior to the effective date of the direct final rule that was published 
in the Federal Register on August 2, 1995 (60 FR 39242). The action is 
necessary because we received adverse comments on the direct final 
rule, and we were unable to withdraw it before the effective date. We 
will follow this action with a proposed rule to provide adequate 
opportunity to comment on proposed changes contained in the direct 
final rule.

DATES: December 19, 1995.

FOR FURTHER INFORMATION CONTACT:
George Wollam, USDA-GIPSA, Room 0623-South Building, 1400 Independence 
Avenue, S.W., Washington, D.C. 20090-6454, telephone (202) 720-0292.

SUPPLEMENTARY INFORMATION: 

Executive Order 12866

    This rule has been determined to be not-significant for the purpose 
of Executive Order 12866 and therefore has not been reviewed by OMB.

Executive Order 12778

    This amended rule has been reviewed under Executive Order 12778, 
Civil Justice Reform. This action is not intended to have a retroactive 
effect. The United States Grain Standards Act provides in section 87g 
that no State or subdivision may require or impose any requirements or 
restriction concerning the inspection, weighing, or description of 
grain under the Act. Otherwise, this rule will not preempt any State or 
local laws, regulations, or policies unless they present irreconcilable 
conflict with this rule. There are no administrative procedures which 
must be exhausted prior to any judicial challenge to the provisions of 
this rule.

Regulatory Flexibility Act Certification

    James R. Baker, Administrator, GIPSA, has determined that this rule 
will not have a significant economic impact on a substantial number of 
small entities. Most users of the official inspection and weighing 
services and those persons that perform those services do not meet the 
requirements for small entities as defined in the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.). Further, the standards are 
applied equally to all entities.

Information Collection and Recordkeeping Requirements

    In compliance with the Paperwork Reduction Act of 1980 (44 U.S.C. 
chapter 35), the information collection and Recordkeeping requirements 
in Part 800 have been approved previously by OMB and assigned OMB No. 
0580-0013.

Background

    The direct final rule published August 2, 1995, (60 FR 39242) 
notified the public of amendments to those regulations that prohibit 
official agencies to provide official weighing service when they 
provide similar unofficial service. GIPSA had planned to allow agencies 
to do both official and unofficial weighing within their assigned 
areas. Two written adverse comments in response to the direct final 
rule were received. The direct final rule was inadvertently not 
withdrawn prior to its effective date. The rule became effective on 
October 2, 1995. This final rule amends the regulations by reinstating 
the regulations that were in effect prior to the effective date of the 
direct final rule. The agency now plans to publish a proposed rule for 
public comment before taking further action to change the regulations.
    Pursuant to 5 U.S.C. 553, it also found and determined that, upon 
good cause, it is impracticable, unnecessary and contrary to the public 
interest to give preliminary notice or to engage in further public 
procedure prior to implementing this action and that good cause exist 
for not postponing the effective date of this action until 30 days 
after publication in the Federal Register because: (1) This action 
reinstates the regulations prior to effective date of the direct final 
rule the was inadvertently not withdrawn; and (2) a proposed rule will 
be published before any further changes to the regulations are made and 
the public will be afforded the opportunity to comment.

Final Action

List of Subjects in 7 CFR Part 800

    Administrative practice and procedure, Conflict of interests, 
Intergovernmental relations, Penalties, Reporting and recordkeeping 
requirements.

    For reasons set forth in the preamble, 7 CFR Part 800 is amended as 
follows:

PART 800--GENERAL REGULATIONS

    1. The authority citation for Part 800 continues to read as 
follows:

    Authority: Pub. L. 94-582, 90 Stat. 2867, as amended (7 U.S.C. 
71 et seq.)

    2. Section 800.76(a) is revised as follows:

Sec. 800.76  Prohibited services; restricted services.

    (a) Prohibited services. No agency shall perform any function or 
provide any service on the basis of unofficial standards, procedures, 
factors, or criteria if the agency is designated or authorized to 
perform the service or provide the service on an official basis under 
the Act.
* * * * *
    3. Section 800.186(c)(3) introductory text is revised to read as 
follows:

Sec. 800.186  Standards of conduct.

* * * * *
    (c) * * *
    (3) Engage in any outside (unofficial) work or activity that:
* * * * *
    4. Section 800.195(f)(5)(ii) is revised to read as follows:

Sec. 800.195  Delegations.

* * * * *

[[Page 65236]]

    (f) * * *
    (5) * * *
    (ii) Unofficial activities. The delegated State or personnel 
employed by the State shall not perform any unofficial service that is 
the same as any of the official services covered by the delegation.
    5. Section 800.196(g)(6)(ii) is revised to read as follows:

Sec. 800.196  Delegations

* * * * *
    (g) * * *
    (6) * * *
    (ii) Unofficial activities. The agency or personnel employed by the 
agency shall not perform any unofficial service that is the same as the 
official services covered by the designation.
* * * * *
    Dated: December 8, 1995.
James R. Baker,
Administrator.
[FR Doc. 95-30593 Filed 12-18-95; 8:45 am]
BILLING CODE 3410-EN-M

Complete official Federal Register PDF

FR Doc. 95-30361 Foreign Option Transactions
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65236-65237]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30361]

=======================================================================
-----------------------------------------------------------------------

COMMODITY FUTURES TRADING COMMISSION

17 CFR Part 30

Foreign Option Transactions

AGENCY: Commodity Futures Trading Commission.

ACTION: Order.

-----------------------------------------------------------------------

SUMMARY: The Commodity Futures Trading Commission (Commission) is 
issuing this Order pursuant to which Option Contracts on a spot foreign 
exchange operation between the Deutsche Mark and the French Franc (DEM/
FRF) traded on the Marche a Terme International de France (MATIF) may 
be offered or sold to persons located in the United States. This Order 
makes it unlawful for any person to engage in the offer or sale of a 
foreign option product until the Commission, by order, authorizes such 
foreign option to be offered or sold in the United States and the 
procedures established by the Mutual Recognition Memorandum of 
Understanding (MRMOU) with the French Commission des Operations de 
Bourse.

EFFECTIVE DATE: January 18, 1996.

FOR FURTHER INFORMATION CONTACT: Warren R. Gorlick, Esq., Division of 
Trading and Markets, Commodity Futures Trading Commission, Three 
Lafayette Centre, 1155 21st Street N.W., Washington, D.C. 20581. 
Telephone: (202) 418-5435.

SUPPLEMENTARY INFORMATION: The Commission has issued the following 
Order:

United States of America Before the Commodity Futures Trading 
Commission

Order Pursuant to the Mutual Recognition Memorandum of 
Understanding with the French Commission des Operations de Bourse 
and Rule 30.3(a) Permitting Option Contracts on the DEM/FRF Traded 
on the Marche a Terme International de France (MATIF) to Be Offered 
or Sold to Persons Located in the United States Thirty Days After 
Publication of This Notice in the Federal Register Absent Further 
Notice

    By Order issued on December 17, 1991 (Initial Order) 1, the 
Commission authorized, pursuant to the Mutual Recognition Memorandum of 
Understanding (MRMOU) 2 and Commission rule 30.3(a),3 certain 
option products traded on the MATIF to be offered or sold in the United 
States.

    \1\ See 56 FR 66345 (December 23, 1991).
    \2\ See 55 FR 23902 (June 13, 1990). Among other things, this 
arrangement provides a mechanism pursuant to which certain option 
products traded on the Marche a Terme International de France 
(MATIF) may be offered or sold to customers resident in the United 
States thirty days after publication in the Federal Register of a 
notice specifying the particular option contracts to be offered or 
sold.
    \3\ Commission rule 30.3(a), 17 CFR 30.3(a), makes it unlawful 
for any person to engage in the offer or sale of a foreign option 
product until the Commission, by order, authorizes such foreign 
option to be offered or sold in the United States.
---------------------------------------------------------------------------

    By letter dated October 24, 1995, MATIF notified the Commission 
that on October 23, 1995 it would be introducing Option Contracts based 
on the DEM/FRF and requested that the Commission supplement its Initial 
Order authorizing the offer and sale in the United States of Options on 
the Notional Bond, the 3-month PIBOR, the 3-month EURODEM Futures 
Contracts; a Supplemental Order, 57 FR 10987 (April 1, 1992), 
authorizing the offer and sale in the United States of Options on the 
Long-Term ECU Bond Futures Contracts; a Supplemental Order, 59 FR 22971 
(May 4, 1994), authorizing the offer and sale in the United States of 
Options on the USD/DEM and USD/FRF; and a Supplemental Order, 60 FR 
34458 (July 3, 1995), authorizing the offer and sale in the United 
States of Options on the GBP/DEM and the DEM/ITL by also authorizing 
the MATIF's Option Contracts on the DEM/FRF to be offered or sold to 
persons located in the United States.4 Based upon the foregoing, 
and pursuant to the terms of the MRMOU, the Commission hereby publishes 
this Order in the Federal Register pursuant to which the particular 
Option Contracts specified herein may be offered or sold thirty days 
after the publication of this Order.

    \4\ See letter dated October 24, 1995 from Catherine Langlais, 
MATIF, to Jane C. Kang, Esq., Division of Trading and Markets. See 
also letter dated November 6, 1995 from Frederic Perier, Commission 
des Operations de Bourse, to Andrea M. Corcoran, Director, Division 
of Trading and Markets.
---------------------------------------------------------------------------

    Accordingly, pursuant to Commission rule 30.3(a), 17 CFR 30.3(a), 
and Article II, paragraph 6(b) and Article V, paragraph 6 of the MRMOU 
signed by the Commission on June 6, 1990 (55 FR 23902 (June 13, 1990)), 
and subject to the terms and conditions specified in the MRMOU, the 
Commission hereby issues this Order pursuant to which Option Contracts 
based on the DEM/FRF traded on the MATIF may be offered or sold to 
persons located in the United States thirty days after publication of 
this Order in the Federal Register, unless prior to that date the 
Commission receives any comments which may result in a determination to 
delay the effective date of the Order pending review of such comments. 
Under such circumstances the Commission will provide notice.

Contract Specifications

DEM/FRF Option

Type
European style
Underlying Interest
Spot currency transaction DEM against FRF
Contract Size
DEM 100,000
Strike Price
Expressed in FRF, with 2 decimals.
Strike price intervals: 1 Centime (3.40-3.41)
Quotation
Premium in % of the DEM nominal, with 2 decimals.
Ex: 0.45% stands for 100,000  x  0.45/100 = DEM 450.
In specific cases, premium with 3 decimals.
Tick
Size: 0.01%
Value: 0.01/100  x  100,000 = DEM 10
Expiration
3 monthly + 3 quarterly expirations from March (H), June (M), September 
(U), December (Z)
Last Trading Day
Thursday following the 3rd Wednesday of expiration month at 9:00 am 
(New York time) 

[[Page 65237]]

First Trading Day
First business day following an expiration date
Exercise
After settlement of a spot-fixing on the expiration date, automatic 
exercise of in-the-money options.
Exercise: exchange of underlying currencies
Trading Hours
Open outcry: 9:15 am to 5:00 pm (Paris time)
THS (after hours trading): 5:00 pm to 9:15 am

List of Subjects in 17 CFR Part 30

    Commodity futures, Commodity options, Foreign transactions.

    Accordingly, 17 CFR part 30 is amended as set forth below:

PART 30--FOREIGN FUTURES AND FOREIGN OPTION TRANSACTIONS

    1. The authority citation for part 30 continues to read as follows:

    Authority: Secs. 2(a)(1)(A), 4, 4c, and 8a of the Commodity 
Exchange Act, 7 U.S.C. 2, 6, 6c and 12a.

    2. Appendix B to part 30 is amended by adding the following entry 
after the existing entries for the ``Marche a Terme International de 
France'' to read as follows:

Appendix B to Part 30--Option Contracts Permitted to be Offered or Sold 
in the U.S. Pursuant to Sec. 30.3(a)

------------------------------------------------------------------------
          Exchange              Type of contract    FR date and citation
------------------------------------------------------------------------
Marche a Terme International  Option Contracts on   December 19, 1995;  
 de France.                    the Deutsche Mark     60 FR 65237        
                               and the French                           
                               Franc (DEM/FRF).                         
                                                                        
    *           *         *         *         *           *         *   
------------------------------------------------------------------------

    Issued in Washington, D.C. on December 6, 1995.
Jean A. Webb,
Secretary to the Commission.
[FR Doc. 95-30361 Filed 12-18-95; 8:45 am]
BILLING CODE 6351-01-P

Complete official Federal Register PDF

FR Doc. 95-30257 Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65387-65436]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30257]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 60

[AD-FRL-5327-5]

RIN 2060-AD00

Standards of Performance for New Stationary Sources and Emission 
Guidelines for Existing Sources

Municipal Waste Combustors
AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action adds standards of performance for new municipal 
waste combustor (MWC) units and emission guidelines for existing MWC's. 
The standards and guidelines implement sections 111 and 129 of the 
Clean Air Act and are based on the Administrator's determination that 
MWC's cause, or contribute significantly to, air pollution that may 
reasonably be anticipated to endanger public health or welfare. The 
standards and guidelines apply to MWC units at plants with aggregate 
capacities to combust greater than 35 megagrams per day (Mg/day) 
(approximately 40 tons per day) of municipal solid waste (MSW) and 
require sources to achieve emission levels reflecting the maximum 
degree of reduction in emissions of air pollutants that the 
Administrator determined is achievable, taking into consideration the 
cost of achieving such emission reduction, and any non-air-quality 
health and environmental impacts and energy requirements. The 
promulgated standards and guidelines establish emission levels for MWC 
organics (dioxins/furans), MWC metals (cadmium (Cd), lead (Pb), mercury 
(Hg), particulate matter (PM), and opacity), MWC acid gases (hydrogen 
chloride (HCl) and sulfur dioxide (SO2)), nitrogen oxides 
(NOX), and MWC fugitive ash emissions. Some of the pollutants 
being regulated are considered to be carcinogens and at sufficient 
concentrations can cause toxic effects following exposure. The 
standards and guidelines also establish requirements for MWC operating 
practices (carbon monoxide (CO), load, flue gas temperature at the PM 
control device inlet, and operator training/certification). 
Additionally, the standards for new MWC plants also require a siting 
analysis and materials separation plan.

DATES: Effective Dates. June 19, 1996 for the standards for new sources 
(Secs. 60.50b through 60.59b) and December 19, 1995 for the emission 
guidelines for existing sources (Secs. 60.30b through 60.39b). The 
incorporation by reference of certain publications listed in the 
regulations is approved by the Director of the Federal Register as of 
June 19, 1996 for the standards for new sources. See table 3 of this 
preamble for a summary of the retrofit schedules for existing MWC 
sources. See SUPPLEMENTARY INFORMATION for a discussion of the schedule 
for judicial review.
    Comments. Comments on the Information Collection Request (ICR) 
document associated with the final standards for new sources are 
requested, as discussed in section VI.B of this preamble. Comments on 
the ICR document must be received on or before February 20, 1996. Refer 
to Section VI.B for further information on this request for comment.

ADDRESSES: Comments. As noted above, comments on the ICR document 

[[Page 65388]]
associated with the final standards for new source are requested. See 
section VI.B and the SUPPLEMENTARY INFORMATION section of this preamble 
for further information on obtaining a copy of the ICR document and 
addresses for submitting comments on the ICR document.
    Background Information. The principal background information for 
the final standards and guidelines includes: (1) A background 
information document (BID) entitled, ``Municipal Waste Combustion: 
Background Information for Promulgated Standards and Guidelines--
Summary of Public Comments and Responses'' (EPA-453/R-95-0136), which 
contains a summary of all the significant public comments submitted 
regarding the proposed standards and guidelines, the EPA's response to 
these comments, and a summary of the changes made to the standards and 
guidelines as a result of the comments; and (2) several technical 
documents listed under SUPPLEMENTARY INFORMATION, including all of the 
background information documents that supported the proposal and 
promulgation of the subpart Ea standards and subpart Ca guidelines. A 
document entitled ``FACT SHEET: New Municipal Waste Combustors--Subpart 
Eb Standards,'' which succinctly summarizes the final standards, and a 
document entitled ``FACT SHEET: Existing Municipal Waste Combustors--
Subpart Cb Emission Guidelines,'' which succinctly summarizes the 
guidelines, are also available. See SUPPLEMENTARY INFORMATION for 
instructions and addresses for obtaining these documents.
    Docket. Docket Nos. A-90-45 and A-89-08, containing supporting 
information used in developing the standards and guidelines, are 
available for public inspection and copying between 8:00 a.m. and 4:00 
p.m., Monday through Friday except for Federal holidays at the 
following address: U.S. Environmental Protection Agency, Air and 
Radiation Docket and Information Center (Mail Code 6102), 401 M Street 
SW, Washington DC 20460 [phone: (202) 260-7548]. The docket is located 
at the above address in room M-1500, Waterside Mall (ground floor, 
central mall). A reasonable fee may be charged for copying.

FOR FURTHER INFORMATION CONTACT: Mr. Walter Stevenson at (919) 541-5264 
or Mr. Fred Porter at (919) 541-5251, Combustion Group, Emission 
Standards Division (MD-13), U.S. Environmental Protection Agency, 
Research Triangle Park, North Carolina 27711.
SUPPLEMENTARY INFORMATION:

Background Information.

    On December 20, 1989, the EPA proposed standards and guidelines for 
MWC's in subparts Ea and Ca of 40 CFR 60, respectively. The subparts Ea 
and Ca were promulgated on February 11, 1991 and were developed under 
authority of paragraph (b) of section 111 of the Clean Air Act of 1977. 
The 1990 Amendments to the Clean Air Act required the EPA to review 
these emission standards and guidelines and determine if they were 
fully consistent with the requirements of section 129. The EPA reviewed 
the subpart Ea standards and subpart Ca guidelines and concluded that 
they were not fully consistent with the requirements of section 129. 
Therefore, the EPA proposed to revise the standards and guidelines in a 
September 20, 1994 proposal to make the standards and guidelines fully 
consistent with the requirements of section 129. Municipal waste 
combustors that begin construction after September 20, 1994 or that 
begin modification or reconstruction after June 19, 1996 and that meet 
all other applicability criteria are subject to the revised standards 
(subpart Eb). Municipal waste combustors that were constructed on or 
before September 20, 1994 and that meet all other applicability 
criteria are subject to the revised guidelines (subpart Cb). Municipal 
waste combustors that were constructed after December 20, 1989 and on 
or before September 20, 1994 and that meet all other applicability 
criteria are subject to both the subpart Ea standards (1991 standards 
for new sources) and the subpart Cb guidelines (1995 retrofit 
guidelines for existing sources). In this final rule, the EPA is 
withdrawing the subpart Ca guidelines (1991 guidelines for existing 
sources). In a separate action in today's Federal Register the EPA is 
publishing a direct final rule amending the text of subpart Ea.
    This Federal Register final rule discusses: (1) The standards for 
new MWC's, (2) the guidelines for existing MWC's, (3) the withdrawal of 
the 1991 subpart Ca guidelines for existing MWC's, and (4) a request 
for public comment on the ICR document. This preamble and regulatory 
text are available on the EPA's Technology Transfer Network (TTN) 
electronic bulletin board. Also available on the EPA's TTN are FACT 
SHEETS, which summarize the final standards and guidelines. They are 
suggested reading for persons requiring an overview of the standards 
and guidelines. The FACT SHEETS can also be obtained by calling Donna 
Collins at (919) 541-5578. The TTN contains 18 electronic bulletin 
boards, and the following 5 items are included in the Clean Air Act 
Amendments (CAAA) bulletin board under menu item ``Recently Signed 
Rules'' in file ``MWC2.ZIP'':
    (1) ``FACT SHEET: New Municipal Waste Combustors--Subpart Eb 
Standards (1995).''
    (2) ``FACT SHEET: Existing Municipal Waste Combustors--Subpart Cb 
Emission Guidelines (1995).''
    (3) Federal Register notice for this promulgation: ``Standards of 
Performance for New Stationary Sources and Emission Guidelines for 
Existing Sources: Municipal Waste Combustors'' (this document).
    (4) ``Municipal Waste Combustion: Background Information for 
Promulgated Standards and Guidelines--Summary of Public Comments and 
Responses,'' EPA-453/R-95-0136.
    (5) Information Collection Request document for these standards for 
new sources: ``Standard Form 83 Supporting Statement for ICR No. 
1506.5--1995 Standards for New Municipal Waste Combustors (Subpart 
Eb),'' September 29, 1995.
    The TTN is accessible 24 hours per day, 7 days per week except 
Monday morning from 8:00 a.m. to 12:00 p.m. when the system is updated. 
The service is free except for the cost of the phone call. Dial (919) 
541-5742 to access the TTN. The TTN is compatible with up to a 14,400 
bits-per-second (bps) modem. An alternative way to access the TTN is by 
``telenet,'' using access code ``ttnbbs.rtpnc.epa.gov''. Further 
instructions for accessing the TTN can be obtained by calling the help 
desk at (919) 541-5384.
    Documents in the Docket. The background information for today's 
promulgation includes all of the documents that supported the proposal 
and promulgation of the subpart Ea standards and subpart Ca guidelines 
(docket No. A-90-45 and docket No. A-89-08). Key background information 
documents used in developing the subpart Ea standards, the subpart Ca 
guidelines, and today's promulgated standards and guidelines are as 
follows:
    (1) ``Municipal Waste Combustors--Background Information for 
Proposed Standards: 111(b) Model Plant Description and Cost Report,'' 
EPA-450/3-89-27b, August 1989;
    (2) ``Municipal Waste Combustors--Background Information for 
Proposed Standards: Post-Combustion Technology Performance,'' EPA-450/
3-89-27c, August 1989;
    (3) ``Municipal Waste Combustion Assessment: Combustion Control at 

[[Page 65389]]
    Existing Facilities,'' EPA-600/8-89-057, August 1989;
    (4) ``Municipal Waste Combustion Assessment, Technical Basis for 
Good Combustion Practices,'' EPA-600/8-89-063, August 1989;
    (5) ``Municipal Waste Combustors--Background Information for 
Proposed Standards: Control of NOX Emissions,'' EPA-450/3-89-27d, 
August 1989;
    (6) ``Municipal Waste Combustors--Background Information for 
Proposed Standards: Cost Procedures,'' EPA-450/3-89-27a, August 1989;
    (7) ``Economic Impact Analysis for Proposed Emission Standards and 
Guidelines for Municipal Waste Combustors,'' EPA-450/3-91-029, March 
1994;
    (8) ``Municipal Waste Combustors--Background Information for 
Proposed Guidelines for Existing Facilities,'' EPA-450/3-89-27e, August 
1989;
    (9) ``Municipal Waste Combustion: Background Information for 
Promulgated Standards and Guidelines--Summary of Public Comments and 
Responses,'' EPA-453/R-95-0136, 1995.
    These documents and additional technical information are contained 
in dockets A-90-45 and A-89-08. Docket materials are available for 
inspection and copying as described in the ADDRESSES section of this 
preamble.
    Judicial Review. Under section 307(b)(1) of the Clean Air Act, 
judicial review of the actions taken by this notice is available by 
filing of a petition for review in the U.S. Court of Appeals for the 
District of Columbia Circuit within 60 days of today's publication of 
this rule. Under section 307(b)(2) of the Clean Air Act, the 
requirements that are in today's notice may not be challenged later in 
the civil or criminal proceedings brought by the EPA to enforce these 
requirements (42 U.S.C. 7607(b)).
    Preamble Outline. The following outline is provided to aid in 
locating information in the introductory text (preamble) to the final 
standards and guidelines.

I. Acronyms, Abbreviations, and Measurement Units

A. Acronyms
B. Abbreviations and Measurement Units

II. Background and Withdrawal of the 1991 Subpart Ca Emission 
Guidelines

III. Summary of Considerations in Developing the 1995 Standards for New 
Sources and Guidelines for Existing Sources

A. Purpose of the Standards and Guidelines
B. Technical Basis of the Standards and Guidelines
C. Stakeholders and Public Involvement

IV. Standards of Performance for New Sources (1995)--Summary of the 
Standards, Impacts of the Standards, and Significant Issues and Changes 
to the Proposed Standards

A. Summary of the Standards
B. Significant Issues and Changes to the Proposed Standards
    1. Applicability
    2. Emission Limits for MWC Metals, Acid Gases, Organics, 
Nitrogen Oxides, and Ash Fugitive Emissions
    3. Good Combustion Practices
    4. Operator Training and Certification
    5. Air Curtain Incinerators
    6. Siting Analysis/Materials Separation Plan
    7. Compliance and Performance Testing
    8. Reporting and Recordkeeping Requirements
C. Impacts of the Standards

V. Guidelines for Existing Sources (1995)--Summary of the Guidelines, 
Impacts of the Guidelines, and Significant Issues and Changes to the 
Proposed Guidelines

A. Summary of the Guidelines
B. Significant Issues and Changes to the Proposed Guidelines
    1. Designated Facilities
    2. Emission Limits for MWC Metals, Acid Gases, Organics, 
Nitrogen Oxides, and Fugitive Ash Emissions
    3. Good Combustion Practices
    4. Operator Training and Certification
    5. Air Curtain Incinerators
    6. Compliance and Performance Testing
    7. Reporting and Recordkeeping Requirements and Compliance 
Schedules
C. Impacts of the Guidelines

VI. Administrative Requirements

A. Docket
B. Paperwork Reduction Act
C. Executive Order 12866
D. Unfunded Mandates Act
E. Executive Order 12875
F. Regulatory Flexibility Act
G. Clean Air Act Procedural Requirements

I. Acronyms, Abbreviations, and Measurement Units

    The following definitions, acronyms, and measurement units are 
provided to clarify the preamble to the final standards and guidelines.

A. Acronyms

ASME American Society of Mechanical Engineers
BID Background Information Document
CEMS continuous emissions monitoring system(s)
COMS continuous opacity monitoring system(s) dioxins/furans 
polychlorinated dibenzo-p-dioxins and polychlorinated dibenzofurans
DSI dry sorbent injection
EPA U.S. Environmental Protection Agency
ESP electrostatic precipitator
FF fabric filter
GCP good combustion practices
ICR information collection request
MACT maximum achievable control technology
MSW municipal solid waste
MWC municipal waste combustor
MWI medical waste incinerator
NSR New Source Review
NOX nitrogen oxides
OAQPS Office of Air Quality Planning Standards
OMB Office of Management and Budget
PM particulate matter
RDF refuse-derived fuel
RFA Regulatory Flexibility Act
SD spray dryer
SNCR selective noncatalytic reduction
TEQ basis 2,3,7,8-tetrachlorinated dibenzo-p-dioxin toxic equivalent 
based on the 1989 international toxic equivalency factors

B. Abbreviations and Measurement Units

 deg.C=degrees Celsius (degrees Fahrenheit= deg.C*9/5+32)
Cd=cadmium
CO=carbon monoxide
CO2=carbon dioxide
dscf=dry standard cubic feet (at 14.7 pounds per square inch, 68 
deg.F)
dscm=dry standard cubic meters (at 14 pounds per square inch, 68 
deg.F)
g=gram (454 grams per pound)
g/yr=grams per year
gr=grains (7,000 grains per pound)
HCl=hydrogen chloride
Hg=mercury
kg=kilogram (0.454 kilograms per pound)
kg/yr=kilograms per year
m3=cubic meter (35.3 cubic feet per cubic meter)
mg=milligrams (10-3 grams)
Mg=megagram (1.1 tons)
Mg/d=megagrams per day
Mg/yr=megagrams per year
ng=nanogram (10-9 grams)
Pb=lead
ppmv=parts per million by volume
SO2=sulfur dioxide
tons/d=tons per day
tons/yr=tons per year
total mass basis (dioxins/furans=total mass of tetra- through octa-
chlorinated dibenzo-p-dioxins and dibzofurans

II. Background and Withdrawal of the 1991 Subpart Ca Emission 
Guidelines

    By the mid-1980's, several studies had been performed to determine 
whether MWC emissions should be regulated and, if so, under what 
section of the Clean Air Act. As set forth in the Advanced Notice of 
Proposed Rulemaking (52 FR 25399, July 7, 1987), the EPA decided to 
regulate air emissions from MWC's under section 111 of the Clean Air 
Act, and to base the 

[[Page 65390]]
regulation on best demonstrated technology, as required by section 111. 
On December 20, 1989, the EPA proposed standards for new MWC's and 
guidelines for existing MWC's (54 FR 52251 and 54 FR 52209, 
respectively). On November 15, 1990, 1990 Amendments to the Clean Air 
Act were enacted and added section 129 to the Clean Air Act. Section 
129 of the Clean Air Act specifies that revised standards and 
guidelines must be developed for MWC's in accordance with the 
requirements of both section 111 and new section 129. Section 129 
further specifies that revised standards and guidelines be developed 
for both large and small MWC plants and that the revised standards and 
guidelines must reflect more restrictive performance levels. Section 
129 includes a schedule for revising the 1991 standards and guidelines.
    When the EPA did not comply with the section 129 schedule, the 
Sierra Club, the Natural Resources Defense Council, and the Integrated 
Waste Services Association filed complaints with the U.S. District 
Court for the Eastern District of New York. The resulting consent 
decree required the EPA Administrator to sign a notice of proposed 
rulemaking not later than September 1, 1994 and a notice of 
promulgation not later than October 31, 1995 (Nos. CV-92-2093, CV-93-
0284, and CV-93-5144). The proposal notice for the standards and 
guidelines was signed as scheduled and published on September 20, 1994 
(59 FR 48198 and 59 FR 48228, respectively). This notice responds to 
the requirement for the Administrator to sign the final standards and 
guidelines by October 31, 1995.
    The standards and guidelines promulgated on February 11, 1991 (56 
FR 5488 and 56 FR 5514, respectively) apply to only large MWC's 
(capacities above 225 Mg/day) and reflect best demonstrated technology. 
Today's notice promulgates revised standards and guidelines that are 
fully consistent with sections 111 and 129 of the Clean Air Act and 
extend coverage of the revised standards and guidelines to MWC units 
located at MWC plants with aggregate plant capacity above 35 Mg/day.
    Today's promulgated standards for new sources are more stringent 
than the standards promulgated on February 11, 1991. Today's 
promulgated standards will apply to plants for which construction 
commenced after September 20, 1994 or for which reconstruction or 
modification commenced after June 19, 1996. The guidelines will apply 
to all MWC's constructed prior to September 20, 1994. The February 11, 
1991 subpart Ea standards will remain in effect for plants constructed, 
modified, or reconstructed between December 20, 1989 and September 20, 
1994. Sources subject to the February 11, 1991 subpart Ea standards are 
also subject to the guidelines being promulgated today under subpart 
Cb. In some cases, the promulgated subpart Cb guidelines are more 
stringent than the existing subpart Ea standards. The control 
technologies being used to meet the emission limits included in the 
1991 subpart Ea standards will be able to comply with the promulgated 
subpart Cb guidelines, except supplemental controls would be required 
to reduce Hg emissions and fugitive ash emissions. The direct final 
rule also being published in today's Federal Register will provide 
consistency between the subpart Ea and Cb rules.
    Today's promulgated guidelines under subpart Cb for existing 
sources are more stringent than the guidelines promulgated under 
subpart Ca on February 11, 1991. Today's promulgated guidelines will 
apply to MWC's for which construction commenced on or before September 
20, 1994. Today's promulgated guidelines are based on maximum 
achievable control technology, or MACT, and will require MWC plants to 
purchase and install different types of air pollution control equipment 
than the best demonstrated technology-based guidelines promulgated in 
1991 under subpart Ca. In consideration of public comments, which 
supported the withdrawal of subpart Ca, and to satisfy the MACT 
requirements of section 129 of the Clean Air Act, the EPA is 
withdrawing the 1991 subpart Ca guidelines as a part of today's action.

III. Summary of Considerations in Developing the 1995 Standards for New 
Sources and Guidelines for Existing Sources

A. Purpose of the Standards and Guidelines

    Under sections 111 and 129 of the Clean Air Act, the EPA is 
required to develop and adopt performance standards and guidelines for 
MWC's. Congress specifically added section 129 to the Clean Air Act to 
address public concerns about MWC's and other solid waste combustion 
units. Under section 111, performance standards and guidelines must be 
developed for new and existing stationary sources that may contribute 
to air pollution and that may reasonably be anticipated to endanger 
public health or welfare. Under section 129 of the Clean Air Act, the 
standards and guidelines adopted for MWC's must be based on MACT.
    Independent of Clean Air Act requirements, the general public is 
concerned about emissions from all sources including MWC's. This is 
understandable considering (1) about two-thirds of the MWC population 
is located in air quality nonattainment areas with high population 
densities, and (2) the EPA's 1994 MWC Dioxin Survey identified a 
limited number of older poorly controlled MWC's with atypically high 
dioxin/furan emissions (interim corrective actions have been taken at 
these MWC's).
    The MWC industry has aggressively controlled new MWC plants built 
since 1990, and almost half of the existing population currently is 
equipped with high efficiency air pollution control equipment. The 
other older half of the population has control equipment with lower 
efficiency. As mentioned earlier, health effects are associated with 
many of the pollutants emitted from MWC's, and the standards and 
guidelines being promulgated today will bring all MWC units up to the 
same high performance level.
    The EPA estimates that in the United States, there are about 307 
operating MWC units at 128 plants, providing a total U.S. MSW 
combustion capacity of about 94,000 Mg/day. Approximately 16 percent of 
MSW generated in the United States is combusted.
    Emissions from MWC's contain organics (dioxins/furans), metals (Cd, 
Pb, Hg, PM, and opacity), acid gases (Hcl and SO2), and NOX. 
These pollutants can have adverse effects on both public health and 
welfare. The EPA recently released a draft report reassessing the 
health effects of human exposure to dioxins/furans. In the draft 
report, which is currently undergoing review, MWC's are identified as 
one source of dioxin/furan emissions. Other MWC emissions of principal 
concern include Pb, Cd, and Hg. Acid gas and NOX emissions 
contribute to acid rain when emissions of SO2 and NOX are 
chemically transformed in the atmosphere into sulfuric and nitric acids 
and return to earth as wet deposition such as rain, fog, or snow, or as 
dry deposition such as fine particles or gases. Acid deposition damages 
lakes and harms forests and buildings. Nitrogen oxides also contribute 
to low-level ozone and urban area smog formation.
    Today's standards and guidelines are set forth as emission limits 
and will significantly reduce MWC emissions. 

[[Page 65391]]

B. Technical Basis of Standards and Guidelines

    Section 129(a)(2) of the Clean Air Act requires the revised 
standards for new MWC's and revised guidelines for existing MWC's to 
reflect the maximum degree of reduction in emissions of designated air 
pollutants, taking into consideration the cost of achieving such 
emission reduction, and any non-air-quality health and environmental 
impacts and energy requirements that the Administrator determines are 
achievable for a particular category of sources. (This control level is 
commonly referred to as the ``maximum achievable control technology, or 
``MACT''.) Section 129 also provides that standards for new sources may 
not be less stringent than the emissions control achieved in practice 
by the best controlled similar unit. This is commonly referred to as 
the ``MACT floor'' for new MWC units. Additionally, section 129 
provides that the emission limitations in the guidelines for existing 
MWC's may not be less stringent than the average emission limitations 
achieved by the best performing 12 percent of units in the category. 
This is commonly referred to as the ``MACT floor'' for existing MWC 
units. Emission control options less stringent than the MACT floor can 
not be considered in developing section 129 standards and guidelines.
    Technical data on the number and size of MWC's, control 
technologies in use, permit emission limits, and emission test data 
were used to determine the MACT floor for new and existing MWC's and to 
define control alternatives. The types of data EPA considered in 
selecting final standards and guidelines included the following: (1) 
Over 100 MWC plant-specific questionnaires; (2) emissions information 
from literature, and State and local agencies; and (3) EPA and industry 
test reports. Overall, the EPA used performance test data from over 60 
MWC plants to develop the standards and guidelines. After proposal, the 
EPA reviewed additional data submitted with public comments on the 
proposal and data that EPA gathered from States and industry. Based on 
the new information, the EPA reviewed both the proposed MACT 
determinations for new and existing MWC's and the regulatory 
alternatives. The reassessment of the standards and guidelines in light 
of the new data resulted in the EPA revising the MACT emission rates 
for some pollutants.
    The most significant changes to the standards and guidelines since 
proposal are summarized in sections IV.B and V.B., respectively, of 
this preamble. The rationales for these changes as well as other 
changes are summarized in the preamble and discussed in more detail in 
the BID. In keeping with the Administrator's ``reinventing government'' 
initiative, several of the changes to the guidelines and standards were 
made to streamline the regulations and provide increased flexibility 
while optimizing environmental control by using common sense 
initiatives. Examples of these changes include the following: (1) 
Reduced dioxin/furan testing for MWC plants with low dioxin/furan 
emission levels; (2) NOX guidelines for large MWC plants that 
allow plants to use an emissions averaging plan to demonstrate 
compliance for two or more existing MWC units located at the same 
facility; (3) clarification of siting requirements for new MWC's; (4) 
providing additional time for MWC operators to obtain operator training 
and certification; (5) replacing quarterly reporting with annual 
reporting (semiannual reporting if noncompliance); (6) revised text to 
clarify that the regulations do not apply to MWC plants with combustion 
capacity less than 35 Mg/day; (7) exemption for plants firing small 
amounts of MSW (10 Mg/day or less); (8) exemption for combustion of 
clean wood; and (9) allowing certain records to be maintained in either 
electronic or paper format without duplication. All of these changes 
are discussed further in sections IV and V of this preamble, and 
represent changes that improve the effectiveness and efficiency of the 
standards and guidelines without any reduction in environmental 
protection.

C. Stakeholders and Public Involvement

    Prior to proposal, in accordance with section 117 of the Clean Air 
Act, the EPA consulated with advisory committees, independent experts, 
Federal departments and agencies, and owners, operators, and 
manufacturers of MWC's. Numerous discussions were held with 
governmental entities, industry representatives, and environmental 
groups including, but not limited to, the following groups: the U.S. 
Conference of Majors, the National League of Cities, the National 
Association of Counties, the Municipal Waste Management Association, 
the Solid Waste Association of North America, the Integrated Waste 
Services Association, the Sierra Club, and the Natural Resources 
Defense Council.
    The standards and guidelines being adopted today were proposed in 
the Federal Register on September 20, 1994 (59 FR 48198 and 59 FR 
48228, respectively). The preambles for the proposed standards and 
guidelines describe the rationale for the proposed standards and 
guidelines. After proposal, the EPA provided interested persons the 
opportunity to comment through a written comment period. The public 
comment period was from September 20, 1994 to November 21, 1994. 
Comments were received from private citizens, industry representatives, 
environmental groups, and governmental entities. The comments have been 
carefully considered, and changes have been made in the standards and 
guidelines where appropriate. Sections IV and V of this preamble 
discuss the major revisions to the standards and guidelines to address 
the commenters' concerns.

IV. Standards of Performance for New Sources (1995)--Summary of the 
Standards, Impacts of the Standards, and Significant Issues and Changes 
to the Proposed Standards

    This section presents a summary of the final standards, including 
identification of the source category and pollutants being regulated, 
and presentation of the final emission limits and their associated 
performance testing, monitoring, recordkeeping and reporting 
requirements. This section also discusses the most significant changes 
to the proposed standards. Also discussed are the impacts of the final 
standards.

A. Summary of the Standards

    The final standards (subpart Eb) apply to each new MWC unit located 
at an MWC facility that has an aggregate plant capacity to combust over 
35 Mg/day of MSW, for which construction commenced after September 20, 
1994 or modification or reconstruction commenced after June 19, 1996. 
Municipal waste combustors that commenced construction on or before 
September 20, 1994 are not covered under the subpart Eb standards. 
Municipal waste combustors constructed on or before September 20, 1994 
are considered existing sources and are subject to the guidelines that 
are addressed in section V of this notice.
    An MWC is defined as any setting or equipment that combusts MSW 
including air curtain incinerators. Municipal solid waste combustion 
includes the direct combustion of MSW or the combustion of MSW gases 
from pyrolysis or gasification. The MWC unit includes any type of 
setting or equipment including combustion equipment with or without 
heat recovery.

[[Page 65392]]

    Municipal solid waste is defined as a mixture or a single-item 
waste stream of household, commercial, and/or institutional discards. 
This would include materials such as paper, yard waste, plastics, 
leather, rubber, glass, metals, and other combustible and 
noncombustible materials. The final MSW definition is revised slightly 
from proposal to make it clear that MSW does not include used motor 
oil; sewage sludge; wood pallets; construction, renovation, and 
demolition wastes (including but not limited to railroad ties and 
telephone poles); clean wood; industrial process or manufacturing 
wastes; medical waste; or motor vehicles. Although these wastes are not 
MSW, they can be intermixed with MSW and can be combusted in MWC 
plants. The regulations do not prohibit their combustion. The 
definition of MSW includes RDF, which is municipal solid waste that is 
shredded (or pelletized) before combustion. Any medical, industrial, or 
other type of waste combustor plant with capability to combust greater 
than 35 Mg/day of MSW and is in compliance with a federally enforceable 
permit to combust less than 10 Mg/day of MSW is not covered by this 
standard. Furthermore, cofired MWC plants that combust less than 30 
percent MSW (on a calendar quarter basis) are exempt. A summary of the 
final standards is presented in table 1. In table 1, significant 
revisions made since proposal are marked with an asterisk (*) and are 
discussed in section IV.B.

       Table 1.--Summary of Standards for new MWC's (Subpart Eb)a       
   [* indicates a significant change since proposal and the change is   
                       discussed in this preamble]                      
------------------------------------------------------------------------
                                                                        
------------------------------------------------------------------------
Applicability                                                           
The final standards apply to new MWC                                    
 units located at plants with                                           
 capacities to combust greater than 35                                  
 Mg/day of residential, commercial, and/                                
 or institutional discards. Industrial                                  
 manufacturing discards are not covered                                 
 by the standards. Any medical,                                         
 industrial manufacturing, municipal,                                   
 or other type of waste combustor plant                                 
 with capacity to combust greater than                                  
 35 Mg/day of MSW and with a federally                                  
 enforceable permit to combust less                                     
 than 10 Mg/day of MSW is not covered.*                                 
                                                                        
Plant Size (MSW combustion capacity)     Requirement.                   
35 Mg/day*..................  Not covered by standards.      
>Mg/day but 225 Mg/day        Subject to provisions listed   
 (referred to as small MWC plants).       below.                        
>225 Mg/day (referred to as large MWC    Subject to provisions listed   
 plants).                                 below.                        
Good Combustion Practices                                               
 Applies to large and small MWC plants.                         
 A site-specific operator training manual is required to be     
 developed and made available for MWC personnel.                        
 The EPA or State MWC operator training course must be completed
 by the MWC chief facility operator, shift supervisors, and control room
 operators.                                                             
 The ASME (or State-equivalent) operator certification must be  
 obtained by the MWC chief facility operator (mandatory), shift         
 supervisors (mandatory), and control room operators (optional).*       
 The MWC load level is required to be measured and not to exceed
 110 percent of the maximum load level measured during the most recent  
 dioxin/furan performance test.                                         
 The PM control device inlet flue gas temperature is required to
 be measured and not to exceed the temperature 17  deg.C above the      
 maximum temperature measured during the most recent dioxin/furan       
 performance test.                                                      
 The CO level is required to be measured using CEMS, and the    
 concentration in the flue gas is required not to exceed the following: 
------------------------------------------------------------------------

                                                                        
                                                              Averaging 
              MWC type                      CO level             time   
                                                               (hours)  
Modular starved-air and excess-air.  50 ppmv...............            4
Mass burn waterwall and refractory.  100 ppmv..............            4
Mass burn rotary refractory........  100 ppmv..............            4
Fluidized-bed combustion...........  100 ppmv..............            4
Pulverized coal/RDF mixed fuel-      150 ppmv*.............            4
 fired.                                                                 
Spreader stoker coal/RDF mixed fuel- 150 ppmv*.............           24
 fired.                                                                 
RDF stoker.........................  150 ppmv..............           24
Mass burn rotary waterwall.........  100 ppmv..............           24
MWC Organic Emissions (measured as                                      
 total mass dioxins/furans):                                            
 Dioxins/furans                                                 
 (performance test by EPA Reference                                     
 Method 23)                                                             
Large and small MWC plants.........  13 ng/dscm total mass              
                                      (mandatory) or 7 ng/              
                                      dscm total mass                   
                                      (optional to qualify              
                                      for less frequent                 
                                      testing).*b.                      

[[Page 65393]]
                                                                        
 Basis for dioxin/furan      GCP and SD/FF/carbon               
 limit                                injection.                        
MWC Metal Emissions:                                                    
 PM (performance test by                                        
 EPA Reference Method 5)                                                
  Large and small MWC plants.......  24 mg/dscm (0.010 gr/              
                                      dscf).*                           
 Opacity (performance test                                      
 by EPA Reference Method 9)                                             
  Large and small MWC plants.......  10 percent (6-minute               
                                      average)                          
 Cd (performance test by                                        
 EPA Reference Method 29)                                               
  Large and small MWC plants.......  0.020 mg/dscm (8.7 gr/             
                                      million dscf).*                   
 Pb (performance test by                                        
 EPA Reference Method 29)                                               
  Large and small MWC plants.......  0.20 mg/dscm (87 gr/               
                                      million dscf).*                   
 Hg (performance test by                                        
 EPA Reference Method 29)                                               
  Large and small MWC plants.......  0.080 mg/dscm (35 gr/              
                                      million dscf) or 85-              
                                      percent reduction in              
                                      Hg emissions                      
 Basis for PM, opacity, Cd,                                     
 Pb, and Hg limits                                                      
  Large and small MWC plants.......  See basis for dioxin/              
                                      furan limit                       
MWC Acid Gas Emissions:                                                 
 SO2 (performance test by                                       
 CEMS)                                                                  
  Large and small MWC plants.......  30 ppmv or 80-percent              
                                      reduction in SO2                  
                                      emissions                         
 HCl (performance test by                                       
 EPA Reference Method 26)                                               
  Large and small MWC plants.......  25 ppmv or 95-percent              
                                      reduction in HCl                  
                                      emissions                         
 Basis for SO2 and HCl       See basis for dioxin/              
 limits                               furan limit..                     
Nitrogen Oxides Emissions:                                              
 NOx (performance test by                                       
 CEMS)                                                                  
                                                                        
  Large MWC plants.................  150 ppmv, except 180               
                                      ppmv is allowed for               
                                      the first year of                 
                                      operation.*                       
  Small MWC plants.................  No NOX control                     
                                      requirement                       
                                                                        
 Basis for NOX limit                                            
                                                                        
  Large MWC plants.................  SNCR                               
  Small MWC plants.................  No NOX control                     
                                      requirement.                      

[[Page 65394]]
                                                                        
Fugitive Ash Emissions:                                                 
 Fugitive emissions                                             
 (performance test by EPA Reference                                     
 Method 22)                                                             
  Large and small MWC plants.......  Visible emissions less             
                                      than 5 percent of the             
                                      time from the ash                 
                                      transfer system                   
                                      except during                     
                                      maintenance and                   
                                      repair activities.*.              
   Basis for fugitive        Wet ash handling or                
   emissions limit.                   enclosed ash handling.            
Siting Requirements:                                                    
   Large and small MWC       (1) Siting analysis*,              
   plants.                            (2) materials                     
                                      separation plan, and              
                                      (3) public meetings               
                                      (including response               
                                      to comments)                      
Performance Testing and Monitoring                                      
 Requirements:                                                          
   Reporting frequency.....  Annual (semiannual if              
                                      violation).*                      
   Load, flue gas            Continuous monitoring,             
   temperature.                       4-hour block                      
                                      arithmetic average.               
   CO......................  CEMS, 4-hour block or              
                                      24-hour daily                     
                                      arithmetic average,               
                                      as applicable.                    
 Dioxins/furans, PM, Cd,                                        
 Pb, HC1, and Hg                                                        
  Large MWC plants.................  Annual stack test (see             
                                      reduced testing                   
                                      option for low                    
                                      emitters of dioxins/              
                                      furans).*                         
  Small MWC plants.................  Annual or third year               
                                      stack test.*                      
   Opacity.................  COMS (6-minute                     
                                      average) and annual               
                                      stack test.                       
   SO2.....................  CEMS, 24-hour daily                
                                      geometric mean.                   

[[Page 65395]]
                                                                        
   NOX (large MWC plants     CEMS, 24-hour daily                
   only).                             arithmetic average.               
   Fugitive ash emissions..  Annual test.                       
*=a significant change since proposal, and the change is discussed in   
  this preamble.                                                        
a All concentration levels in the table are corrected to 7 percent O2,  
  dry basis.                                                            
b Although not part of the dioxin/furan limit, the limit of 13 ng/dscm  
  total mass is equal to about 0.1 to 0.3 ng/dscm TEQ. The optional     
  reduced testing limit of 7 ng/dscm total mass is equal to about 0.1 to
  0.2 ng/dscm TEQ.                                                      

    B. Significant Issues and Changes to the Proposed Standards (Issues 
were marked with the ``*'' symbol in table 1)
    The most significant changes to the standards since proposal are 
discussed below. Additional rationales for these changes, as well as 
other changes being made are provided in the promulgation BID (EPA-453/
R-95-0136). Some of the changes made that are not discussed below 
include GCP requirements, monitoring requirements, and reporting and 
recordkeeping requirements.
1. Applicability
    At proposal, an MWC plant of 35 Mg/day capacity that cofired 30 
percent (10 Mg/day) or less MSW would have been exempt from the 
standards. This 30 percent cofiring provision was retained in the final 
rule. Additionally, a 10 Mg/day exemption has been added to the final 
rule to exempt all combustion units independent of size that fire only 
a small amount of MSW. In the final standards, any medical, industrial 
manufacturing, or other type of waste combustor capable of combusting 
more than 35 Mg/day MSW but actually combusting less than 10 Mg/day of 
MSW is not subject to this rule, provided it submits an initial report 
containing a copy of the plant's federally enforceable permit limiting 
the amount of MSW that may be combusted by the plant to less than 10 
Mg/day and keeps records on the daily weight of MSW fired.
    At proposal, a cofired combustor was defined as a unit combusting a 
fuel feed stream where 30 percent or less was comprised of MSW, as 
measured on a 24-hour daily basis. Several commenters expressed concern 
about a cofired status determination being made on a daily basis. For 
example, some facilities that burn biomass material including yard 
waste would have difficulty making a determination of cofired status on 
a daily basis. Biomass material including yard waste (which is MSW) and 
clean wood (which is not MSW) are often collected together and stored 
on- or off-site for a period of time and intermixed before being 
combusted. In such cases, it is difficult or impossible to determine 
what percentage of the waste combusted daily was yard waste. After 
considering the public comments, the EPA determined that the definition 
of cofired combustor should be revised to allow for measuring the 
percent MSW burned on a calendar quarterly basis. This change is 
consistent with current waste refuse storage and recordkeeping 
procedures.
    Also under the proposal, MWC plants of 25 to 35 Mg/day capacity 
were required to submit an initial notification of construction, but 
they were not subject to the proposed standards or guidelines. Only MWC 
plants greater than 35 Mg/day capacity were covered by the proposal. As 
part of the Administrator's ``reinventing government'' initiative, the 
initial notification requirement for MWC plants between 25 and 35 Mg/
day capacity was removed from the final rule to minimize the reporting 
requirement for smaller plants. This change reduced reporting and 
recordkeeping requirements for both the MWC and the EPA, but did not 
reduce the level of environmental protection provided by the standards 
and guidelines being adopted today.
    Under the proposed standards, clean wood was included in the 
definition of MSW. Several commenters disagreed with this decision to 
cover clean wood under the MWC standards. Under the final rule, clean 
wood is not considered to be MSW. Clean wood includes untreated wood or 
untreated wood products including clean untreated lumber, tree stumps 
(whole or chipped), and tree limbs (whole or chipped). Clean wood is 
exempt from the definition of MSW because available data indicate that 
combustion of clean wood results in low emission of dioxins/furans, Hg, 
and other pollutants. Clean wood is predominantly an agricultural, 
industrial, or other nonmunicipal solid waste; regulation of the 
combustion of these types of wastes is currently being addressed under 
a separate rulemaking. Clean wood does not include yard waste, which is 
covered by the final MWC standards; yard waste includes grass, grass 
clippings, bushes, shrubs, and clippings from bushes and shrubs that 
are generated by residential, commercial/retail, institutional, or 
nonmanufacturing industrial sources as part of maintenance activities 
associated with yards or other private or public lands.
2. Emission Limits for MWC Metals, Acid Gases, Organics, Nitrogen 
Oxides, and Ash Fugitive Emissions
    Many commenters expressed concern as to whether the proposed 
emission limits for all regulated pollutants are actually achievable by 
an MWC. These commenters noted that no single MWC existed with all the 
controls proposed as MACT (SD/FF/SNCR and carbon injection) and the 
standards may not be achievable. Since proposal, the EPA has obtained 
data from 12 new MWC units at 5 MWC plants that have recently begun 
operation and all are equipped with the full set of controls proposed 
as MACT (SD/FF/SNCR and carbon injection). Data from these plants show 
that all proposed emission limits for all pollutants are simultaneously 
being achieved. Therefore, the EPA remains convinced that properly 
designed, constructed, maintained, and operated MWC plants can comply 
with all pollutant emission limits included in the final standards.
    For new sources, the MACT floor for each regulated pollutant was 
established as the emission level achievable by the best controlled 
source. To determine new source MACT for proposal, the EPA evaluated 
the performance of SD/FF/SNCR/carbon injection. Since proposal, the EPA 
obtained additional information regarding the performance of the 
control technologies determined to be MACT (SD/FF/SNCR/carbon 
injection). Based on the new information and a reevaluation of the data 
used for proposal, the EPA revised the achievable performance levels 
for PM, Cd, Pb, Hg, dioxins/furans, and NOX. Changes to the MACT 
floor levels and the selected MACT standards resulting from these 
reevaluations are discussed below. 

[[Page 65396]]

a. MWC Acid Gases. The MACT floor levels and selected MACT emission 
limits for MWC acid gases are the same as proposed.
    b. MWC Metals. Based on comments and data received since proposal, 
the EPA reassessed the achievable performance levels for PM, Cd, and Pb 
by SD/FF systems. Based on this reassessment of available data, the 
selected PM, Cd, and Pb MACT emission limits were revised. For both 
large and small plants, the PM MACT floor and selected MACT limit were 
revised to 24 mg/dscm (proposal was 15 mg/dscm). The Cd MACT floor and 
selected MACT limit were revised to 0.020 mg/dscm (proposal was 0.010 
mg/dscm). The Pb MACT floor and selected MACT limit were revised to 
0.20 mg/dscm (proposal was 0.10 mg/dscm). The selected MACT limits for 
all three pollutants were revised because, based on available data, 
emission levels more stringent than these levels are not considered to 
be continuously achievable.
    The final MACT limits for Hg emissions for large and small plants 
remain at the same levels as proposed (0.080 mg/dscm or an 85 percent 
reduction in Hg emissions); however, the MACT floor level was revised. 
At proposal, the MACT floor for Hg was based on use of an SD/FF system 
combined with GCP. Carbon injection was not commercially operational at 
any MWC. At proposal, MACT for Hg was based on use of an SD/FF system 
in combination with carbon injection. This MACT selection was based on 
evaluation of emission reductions, costs, and other factors, as 
described in the proposal preamble (59 FR 48198, September 20, 1994). 
Several commenters questioned the selection of an Hg MACT limit based 
on carbon injection when carbon injection was not commercially 
operated. Since proposal, data have become available for 12 new MWC 
units initiating operation using carbon injection commercially, and all 
were meeting the proposed Hg limits. Since carbon injection is now in 
commercial operation, the EPA revised the final MACT floor for Hg to be 
based on SD/FF in combination with carbon injection and GCP.
    c. MWC Organics. The final emission limits for dioxins/furans for 
new MWC's remain at the same level as proposed; however, the technology 
basis for the floor level of control has been changed. As discussed in 
section IV.B.2.b regarding MWC metals (Hg), the EPA reviewed new data 
received since proposal and concluded that SD/FF combined with GCP and 
carbon injection is the best emission control technology being used by 
MWC's for Hg and dioxin/furan control, and is, therefore, the basis of 
the final MACT floor. The data gathered prior to proposal as well as 
data for new units operating with these controls show that a dioxin/
furan level of 13 ng/dscm is achievable. The final MACT emission limit 
for dioxins/furans for new units at both large and small plants is 
equal to the MACT floor and remains at 13 ng/dscm (total mass basis).
    The format of the final dioxin/furan emission limit changed from 
the proposed format. The EPA proposed a dual format for the dioxin/
furan emission limit (total or TEQ) and requested comments on the use 
of this dual format. No commenters agreed with the dual format as 
proposed. The EPA has selected total mass dioxin/furan emissions in the 
final standards. The TEQ format is not used. There is no indication 
that TEQ's would be a better measure of emissions control performance 
than total dioxins/furans. Furthermore, most test data on which the 
standards are based were expressed as total dioxins/furans. 
Additionally, because there have been different methods for calculating 
TEQ over time and the ratio of total dioxins/furans to TEQ dioxins/
furans varies among MWC's, there would be additional uncertainty in 
using a TEQ data base. Refer to the promulgation preamble (56 FR 5504) 
for the 1991 subpart Ea standards for additional discussion.
    Although not part of the dioxin/furan limit, the limit of 13 ng/
dscm total mass is equal to about 0.1 to 0.3 ng/dscm TEQ.
    In addition to the final dioxin/furan limit of 13 ng/dscm, a 
provision has been added to the final standards allowing less frequent 
dioxin/furan testing for new plants achieving dioxin/furan emission 
levels lower than 7 ng/dscm. Data for new MWC's using SD/FF/SNCR/carbon 
injection technology suggest this is a realistic goal for many new 
MWC's and will encourage MWC's to optimize performance of pollution 
control systems. Refer to section IV.B.7 for a description of the 
alternative dioxin/furan testing schedule.
    d. Nitrogen Oxides. As explained at proposal (59 FR 48198, 
September 20, 1994), the combination of SD/FF, GCP, and SNCR was the 
basis of the new source MACT floor for NOX. These technologies 
remain the basis for the final NOX MACT floor. Since proposal, the 
EPA has obtained additional NOX data showing that large MWC plants 
equipped with SNCR can continuously achieve an emission level of 150 
ppmv over a 24-hour averaging period. The new data were obtained from 
the same plant that was the basis of the proposed NOX emission 
level of 180 ppmv. The new data are representative of what NOX 
emission level can be achieved after a plant has had a period of time 
to adjust to operation with the SNCR system. Applications of SNCR 
typically require some site-specific fine-tuning to achieve optimum 
performance levels. Based on the revised data, a two-phase standard is 
being adopted. The final NOX standard for MWC's at large plants 
allows time to ``fine-tune'' the SNCR system. The final standard for 
MWC's at large plants is 180 ppmv (24-hour averaging period) for the 
first year of operation, and 150 ppmv (24-hour averaging period) 
thereafter.
    The final standards do not require NOX control for MWC's at 
small plants.
    e. MWC Fugitive Ash Emissions. The proposed fugitive ash emission 
limit allowed no visible emissions from ash handling and transfer 
points. Several commenters objected to the proposed level of no visible 
emissions. The commenters were concerned that even where the best ash 
management practices such as wetting the ash or enclosing transfer 
systems, there may be short periods of time when visible emissions are 
observed, such as during maintenance. The proposal was based on about 
16 hours of method 22 visible emissions data for ash handling practices 
at two MWC plants and observations (not using method 22) at two 
additional MWC plants. Since proposal, the EPA has reviewed visible 
emission data from other industries that use similar transfer systems. 
Based on comments received and the review of additional data, the final 
fugitive ash emission limit was revised to limit visible emissions to 
no more than 5 percent of the time.
    As part of the final fugitive ash emission requirements, an 
exemption has been provided during maintenance and repair activities, 
because these necessary activities may require opening of an enclosure 
that could generate short-term visible emissions.
3. Good Combustion Practices
    The proposed standards included CO limits for nine categories of 
combustor technologies, including, among others, RDF stoker combustors 
and coal/RDF mixed fuel-fired combustors. Commenters requested 
clarification on which CO limit applies to a stoker unit that is 
designed to combust coal and RDF but only combusts RDF. Under the final 
standards, a spreader stoker unit burning RDF only or cofiring RDF with 
coal would be subject to the proposed RDF stoker CO limit. To clarify 
this 

[[Page 65397]]
requirement, the final CO requirements include an additional category 
of combustor technology referred to as ``spreader stoker coal/RDF mixed 
fuel-fired combustors,'' which are assigned the same CO limit and 
averaging time as RDF stoker combustors (150 ppmv, 24-hour averaging 
time). The final standards further clarify that the category of 
combustors referred to in the proposed standards as coal/RDF mixed 
fuel-fired combustors only includes pulverized coal/RDF mixed fuel 
streams, and the CO limit and averaging time remains the same as 
proposed (150 ppmv, 4-hour averaging time).
4. Operator Training and Certification
    The proposed standards required full ASME certification of chief 
facility operators and shift supervisors within 6 months of startup of 
an affected MWC. Various commenters including ASME pointed out that the 
proposed standards did not include sufficient time for ASME to conduct 
full certification exams for all MWC operators. After considering these 
comments, the EPA revised the operator training requirements to allow 
additional time for ASME (or State) certification exams. In the final 
standards, chief facility operators and shift supervisors at new MWC 
plants must obtain ASME or State-approved provisional certification 
within 1 year after promulgation or 6 months after startup, whichever 
is later. In addition, by this same date (1 year after promulgation or 
6 months after startup, whichever is later), the same personnel must be 
either fully certified or scheduled with ASME or the State to take a 
full certification exam (instead of actually obtaining full 
certification within 1 year, as proposed).
5. Air Curtain Incinerators
    No changes were made to the proposed standards for air curtain 
incinerators. As discussed above in section IV.B.1, the final standards 
do not cover combustion of clean wood; therefore, air curtain 
incinerators combusting only clean wood are not covered by the 
standards.
6. Siting Analysis/Materials Separation Plan
    Various commenters said the proposed siting analysis was not 
consistent with section 129 of the Clean Air Act. Commenters also 
argued that the proposed siting requirements were either too stringent 
or not stringent enough. The siting analysis in the final rule has been 
reworded to allow for a consideration of alternatives, on a site-
specific basis, to minimize to the maximum extent practicable potential 
risks to the public health or the environment. These changes ensure 
consistency with section 129(a)(3) of the Clean Air Act.
7. Compliance and Performance Testing
    Both the proposed and final standards require all plants to perform 
annual performance tests for dioxin/furan emissions. However, a 
provision for less frequent dioxin/furan testing has been added to the 
final rule to encourage MWC plants to achieve emission levels 
significantly lower than 13 ng/dscm. By achieving low dioxin/furan 
emissions, they would qualify for less frequent testing and thereby 
reduce their testing costs. If all MWC units at an MWC plant achieve 7 
ng/dscm dioxins/furans or less during performance testing for 2 
consecutive years of operation, the plant can elect to conduct dioxin/
furan testing on one unit per year. The plant must test units in 
sequence (e.g., a 3-unit plant would test unit 1 (year 1), unit 2 (year 
2), unit 3 (year 3), unit 1 (year 4), etc.). If an annual performance 
test conducted on any unit indicates total dioxin/furan emissions are 
greater than 7 ng/dscm, the plant must revert to testing all units 
annually beginning the following year until the 2-year compliance 
record is reestablished.
    For small plants, two options are provided. The one-unit incentive 
schedule discussed above is provided for dioxin/furan testing. An 
alternative 3-year testing option is also provided for small plants. 
The alternative 3-year testing option allows small plants to conduct 
performance tests for dioxins/furans, as well as PM, HCl, Cd, Pb, and 
Hg only once every 3 years if the plant demonstrates compliance with 
all pollutant emission limits for 3 consecutive years and continues to 
demonstrate compliance every third year. The owner or operator of a 
small plant may choose either option for performance testing.
8. Reporting and Recordkeeping Requirements
    Reporting requirements have been changed from quarterly as proposed 
to annual (semiannual if any emission limits or operating parameters 
are violated) to reduce the burden on affected plants. In recognition 
of the cost associated with reporting requirements, the EPA 
reconsidered the effectiveness of quarterly versus annual reporting for 
the purpose of determining compliance. After careful reconsideration, 
the EPA has concluded that annual reporting will provide adequate 
information for most plants. [The EPA notes, however, that once an MWC 
is required to obtain a Title V Operating Permit, the Title V reporting 
requirements given in Section 504(a) of the Act will supersede the 
annual reporting requirements presented above. Section 504(a) requires 
permittees to submit monitoring reports to the permitting authority no 
less often than every six months. See 42 U.S.C. 7661c(a).]

C. Impacts of the Standards

    The final standards can be achieved by utilizing any technology. 
The basis for the MACT-based limits at both proposal and promulgation 
remain the combination of GCP/SD/FF and carbon injection for new large 
and small plants, and the additional use of SNCR at large plants. 
Because the technology basis for the final standards is the same as at 
proposal, the impacts analysis presented at proposal has not been 
revised. Table 2 provides a brief summary of the air and cost impacts 
of the standards. The summary in table 2 provides impacts estimates 
relative to two baseline scenarios: a pre-1989 baseline (typical 
control prior to the 1991 subpart Ea standards) and a 1991 baseline 
(typical control under the 1991 subpart Ea standards). Refer to the 
preamble to the proposed standards (59 FR 48198) for a detailed summary 
of these air and control cost impacts, as well as a discussion of the 
water, solid waste, energy, and economic impacts of the rule. The 
national impacts estimates provided in table 2 and discussed in the 
proposal preamble represent the EPA's estimate of the worst case of 
impacts that would result from implementation of the standards. Recent 
data suggest a reduction in the construction of new MWC's. This would 
reduce the cost of the standards.

                                                                        

[[Page 65398]]
                Table 2.--Impacts of the Current Subpart Ea and Promulgated Subpart Eb Standards                
----------------------------------------------------------------------------------------------------------------
                                                                   Increment of                                 
                                                                    promulgated                                 
                            Parameter                             standards over  1991 Standards      Total b   
                                                                     the 1991            a                      
                                                                     standards                                  
----------------------------------------------------------------------------------------------------------------
New MWC's subject to Standards in the Fifth Year After                                                          
 Promulgation:                                                                                                  
    Combustion capacity (106 Mg/yr).............................            0.8            16.8            17.6 
    Number of MWC plants........................................           24              48              72   
Cost (1990 Dollars):                                                                                            
    Capital cost ($106).........................................          156             613             769   
    Annualized cost ($106/yr)...................................           43             157             200   
    Average cost increase ($/Mg MSW combusted)..................            1.95           11.55           13.50
Annual Emissions Reduction (Mg/yr):                                                                             
    SO2.........................................................        3,000          35,000          38,000   
    Hcl.........................................................        4,000          46,000          50,000   
    PM..........................................................          800           5,700           6,500   
    Cd..........................................................            1               9              10   
    Pb..........................................................           17             140             157   
    Hg..........................................................           18               9              27   
    Nox.........................................................          200          10,300          10,500   
    Total dioxins/furans (kg/yr)................................            1              28              29   
----------------------------------------------------------------------------------------------------------------
a The impacts are based on a pre-1989 baseline (i.e., a baseline prior to the effective date of the subpart Ea  
  standards.                                                                                                    
b The total impacts are calculated by adding the incremental impacts of the promulgated standards (subpart Eb)  
  to the impacts of the 1991 standards (subpart Ea). These impacts would be equivalent to the total impacts of  
  the promulgated standards over a pre-1989 baseline.                                                           

    A number of comments were received on the possible effects on EPA's 
costing analysis following the recent Supreme Court decision that 
``flow control'' is unconstitutional. The EPA considered the effect of 
flow control on the financing of new MWC's. In summary, the EPA finds 
that if tipping fees are raised to cover the increased costs of these 
regulations, then the lack of ``flow control'' requirements will likely 
result in fewer MWC's being constructed and a shift of wastes to other 
disposal options. The impacts of the flow control decision is likely to 
be very place-specific depending on the relative tipping fees of MWC's 
and other disposal options, transportation costs, and institutional 
factors.

V. Guidelines for Existing Sources (1995)--Summary of the Guidelines, 
Impacts of the Guidelines, and Significant Issues and Changes to the 
Proposed Guidelines

    This section presents a summary of the final guidelines, including 
identification of the source category and pollutants being regulated, 
and presentation of the final emission limits and their associated 
performance testing, monitoring, recordkeeping, and reporting 
requirements and compliance schedules. This section also provides a 
discussion of the most significant issues and changes to the proposed 
guidelines. Also mentioned are the impacts of the final guidelines.
    The EPA strongly believes (based on emissions data from MWC's which 
incorporate the necessary control technology) that the air pollution 
control technology to be retrofitted to existing MWC's to meet the 
emission guidelines will reduce actual emissions to levels 
significantly below the limits established by the emission guidelines. 
There remains, however, some uncertainty as to the actual performance 
level that will be achieved on a continuous basis by the control 
technology when installed at large MWC plants where ESP-based scrubber 
systems are used. Therefore, the dioxin/furan emission limits included 
in the emission guidelines for some types of MWC's, while still 
significantly below the MACT floor, are slightly less stringent than 
those included in the proposal.
    The EPA will track the implementation of the guidelines and annual 
performance test results in order to monitor the level of emissions 
including dioxin/furan control actually achieved by the guidelines. 
Additionally, the EPA may conduct supplemental dioxin/furan tests. The 
EPA will also meet with MWC owners and operators as needed to review 
the performance of the air pollution control technology and the 
effectiveness of maintenance and operational practices in order to 
provide information that will lead to optimal performance of emission 
control technology, and will work with MWC owners and operators to 
assure a continued high level of public safety.

A. Summary of the Guidelines

    The final guidelines require States to develop emission regulations 
limiting air emissions from each existing MWC unit located at a MWC 
plant that has an aggregate plant capacity to combust more than 35 Mg/
day of MSW, for which construction commenced on or before September 20, 
1994.
    The aggregate design capacity of all existing MWC's at an MWC plant 
shall be considered in determining: (1) Whether a plant is subject to 
the guidelines; and (2) what control levels are applicable. The 
capacity of new MWC's (i.e., those that commenced construction after 
September 20, 1994 or that commenced modification or reconstruction 
after June 19, 1996 that are located at the MWC plant are not 
considered in determining applicability of the guidelines but would be 
considered in determining the applicability of subpart Eb (standards 
for new sources). Only MWC units constructed before September 20, 1994 
are considered for determining the applicability of the guidelines. 
Modification of an existing MWC (or funds spent) to comply with the 
emission guidelines would not be considered in determining if an 
existing MWC unit was subject to the standards for new MWC's (subpart 
Ea or Eb).
    Municipal waste combustion plants with a federally enforceable 
permit to combust less than 10 Mg/day of MSW are exempt from the 
requirements of the guidelines as long as they submit a notification of 
exemption and keep daily records of the weight of MSW combusted.
    Cofired combustors (i.e., that combust less than 30 percent MSW) 
located at a plant with an aggregate plant capacity greater than 35 Mg/
day are exempt from the requirements of the guidelines as 

[[Page 65399]]
long as they submit a notification of exemption and keep records of the 
weight of MSW combusted on a calendar quarter basis.
    The definitions of MWC and MSW have been revised but are the same 
for the guidelines as for the standar
FR Doc. 95-30257 Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources
ds, and are discussed in the 
summary of the standards in section IV.A of this notice.
    A summary of the final guidelines is presented in table 3.

    Table 3. Summary of Guidelines for Existing MWC's (Subpart Cb) a    
   [* indicates a significant change since proposal and the change is   
                       discussed in this preamble]                      
------------------------------------------------------------------------
                                                                        
------------------------------------------------------------------------
Applicability                                                           
The final guidelines apply to existing                                  
 MWC's located at plants with                                           
 capacities to combust greater than 35                                  
 Mg/day of residential, commercial, and/                                
 or institutional discards. Industrial                                  
 manufacturing discards are not covered                                 
 by the guidelines. Any medical,                                        
 industrial manufacturing, municipal,                                   
 or other type of waste combustor plant                                 
 with capacity to combust greater than                                  
 35 Mg/day of MSW and with a federally                                  
 enforceable permit to combust less                                     
 than 10 Mg/day of MSW is not covered.*                                 
                                                                        
Plant Size (MSW combustion capacity)     Requirement                    
<35 Mg/day*............................  Not covered by guidelines.     
> 35 Mg/day but 225 Mg/day    Subject to provisions listed   
 (referred to as small MWC plants).       below.                        
> 225 Mg/day (referred to as large MWC   Subject to provisions listed   
 plants).                                 below.                        
Good Combustion Practices                                               
 Applies to large and small MWC plants.                         
 A site-specific operator training manual is required to be     
 developed and made available for MWC personnel.                        
 The EPA or a State MWC operator training course would be       
 required to be completed by the MWC chief facility operator, shift     
 supervisors, and control room operators.                               
 The ASME (or State-equivalent) provisional and full operator   
 certification must be obtained by the MWC chief facility operator      
 (mandatory), shift supervisors (mandatory), and control room operators 
 (optional).*                                                           
 The MWC load level is required to be measured and not to exceed
 110 percent of the maximum load level measured during the most recent  
 dioxin/furan performance test.                                         
 The maximum PM control device inlet flue gas temperature is    
 required to be measured and not to exceed the temperature 17 deg.C     
 above the maximum temperature measured during the most recent dioxin/  
 furan performance test.                                                
 The CO level is required to be measured using a CEMS, and the  
 concentration in the flue gas is required not to exceed the following: 
------------------------------------------------------------------------

                                                                        
                                                              Averaging 
              MWC type                      CO level             time   
                                                               (hours)  
Modular starved-air and excess-air.  50 ppmv...............            4
Mass burn waterwall and refractory.  100 ppmv..............            4
Mass burn rotary refractory........  100 ppmv..............           24
Fluidized-bed combustion...........  100 ppmv..............            4
Pulverized coal/RDF mixed fuel-      150 ppmv*.............            4
 fired.                                                                 
Spreader stoker coal/RDF mixed fuel- 200 ppmv*.............           24
 fired.                                                                 
RDF stoker.........................  200 ppmv..............           24
Mass burn rotary waterwall.........  250 ppmv..............           24

MWC Organic Emissions (measured as total mass dioxins/furans):          
 Dioxins/furans (performance test by EPA Reference Method 23)   
  Large MWC plants                                                      
    MWC units utilizing an ESP-based     60 ng/dscm total mass          
     air pollution control system.        (mandatory) or 15 ng/dscm     
                                          total mass (optional to       
                                          qualify for less frequent     
                                          testing).* c                  
    MWC units utilizing a nonESP-based   30 ng/dscm total mass          
     air pollution control system.        (mandatory) or 15 ng/dscm     
                                          total mass (optional to       
                                          qualify for less frequent     
                                          testing).* c                  
  Small MWC plants.....................  125 ng/dscm total mass         
                                          (mandatory) or 30 ng/dscm     
                                          total mass (optional to       
                                          qualify for less frequent     
                                          testing).* c                  
 Basis for dioxin/furan limits                                  
  Large MWC plants.....................  GCP and SD/ESP or GCP and SD/  
                                          FF, as specified above.       
  Small MWC plants.....................  GCP and DSI/ESP.               
MWC Metal Emissions:                                                    
 PM (performance test by EPA Reference Method 5)                
  Large MWC plants.....................  27 mg/dscm (0.012 gr/dscf).    
  Small MWC plants.....................  70 mg/dscm (0.030 gr/dscf).*   
 Opacity (performance test by EPA Reference Method 9)           
  Large and small MWC plants...........  10 percent (6-minute average)  
 Cd (performance test by EPA Reference Method 29)               
  Large MWC plants.....................  0.040 mg/dscm (18 gr/million   
                                          dscf).                        
  Small MWC plants.....................  0.10 mg/dscm (44 gr/million    
                                          dscf).                        
 Pb (performance test by EPA Reference Method 29)               
  Large MWC plants.....................  0.49 mg/dscm (200 gr/million   
                                          dscf).*                       
  Small MWC plants.....................  1.6 mg/dscm (700 gr/million    
                                          dscf).                        
 Hg (performance test by EPA Reference Method 29)               
  Large and small MWC plants...........  0.080 mg/dscm (35 gr/million   
                                          dscf) or 85-percent reduction 
                                          in Hg emissions.              
 Basis for PM, opacity, Cd, Pb, and Hg limits                   
  Large MWC plants.....................  GCP and SD/ESP/CI or GCP and SD/
                                          FF/CI                         

[[Page 65400]]
                                                                        
  Small MWC plants.....................  GCP and DSI/ESP/CI.            
MWC Acid Gas Emissions:                                                 
 SO2 (performance test by CEMS)                                 
  Large MWC plants.....................  31 ppmv or 75-percent reduction
                                          in SO2 emissions.*            
  Small MWC plants.....................  80 ppmv or 50-percent reduction
                                          in SO2 emissions.             
 HCl (performance test by EPA Reference Method 26)              
  Large MWC plants.....................  31 ppmv or 95-percent reduction
                                          in HCl emissions.*            
  Small MWC plants.....................  250 ppmv or 50-percent         
                                          reduction in HCl emissions.   
 Basis for SO2 and HCl limits                                   
  Large and small MWC plants...........  See basis for MWC metals.      
Nitrogen Oxides Emissions                                               
 NOX (performance test by CEMS)                                 
  Large MWC plants:                                                     
    Mass burn waterwall................  200 ppmvb.                     
    Mass burn rotary waterwall.........  250 ppmvb.                     
    Refuse-derived fuel combustor......  250 ppmvb.                     
  Fluidized bed combustor..............  240 ppmvb.                     
  Mass burn refractory.................  No NOX controlb requirement    
  Other................................  200 ppmvb.                     
  Small MWC plants.....................  No NOx control requirement.    
 Basis for NOx limits                                           
  Large MWC plants.....................  SNCR.                          
  Refractory MWC plants................  No NOX control requirement     
  Small MWC plants.....................  No NOX control requirement.    
Fugitive Ash Emissions:                                                 
 Fugitive Emissions                                             
 (performance test by EPA Reference                                     
 Method 22)                                                             
  Large and small plants...............  Visible emissions 5 percent of 
                                          the time from ash transfer    
                                          systems except for maintenance
                                          and repair activities.*       
 Basis for fugitive emission     Wet ash handling or enclosed   
 limit                                    ash handling.                 
Performance Testing and Monitoring                                      
 Requirements:                                                          
 Reporting frequency             Annual (semiannual if          
                                          violation)*.                  
 Load, flue gas temperature      Continuous monitoring, 4-hour  
                                          block arithmetic average      
 CO                              CEMS, 4-hour block or 24-hour  
                                          daily arithmetic average, as  
                                          applicable                    
 Dioxins/furans, PM, Cd, Pb,                                    
 HCl, and Hg                                                            
  Large MWC plants.....................  Annual stack test.*            
  Small MWC plants.....................  Annual or third year stack     
                                          test.                         
 Opacity                         COMS (6-minute average) and    
                                          annual stack test.            
 SO2                             CEMS, 24-hour daily geometric  
                                          mean.                         
 NOX (large MWC plants only)     CEMS, 24-hour daily arithmetic 
                                          average.                      
 Fugitive ash emissions          Annual test.*                  
Compliance Schedule:                                                    
 Large MWC plants                                               
  State plans are required to include one of the following three        
   retrofit schedules for compliance with regulatory requirements: (1)  
   Full compliance or closure within 1 year following EPA approval of   
   the State plan; (2) full compliance in 1 to 3 years following        
   issuance of a revised construction or operation permit if a permit   
   modification is required or 1 to 3 years following EPA approval of   
   the State plan if a permit modification is not required, provided the
   State plan includes measurable and enforceable incremental steps of  
   progress toward compliance; or (3) closure in 1 to 3 years following 
   approval of the State plan, provided the State plan includes a       
   closure agreement. If a State plan allows the second or third        
   scheduling options (i.e., more than 1 year), the State plan submitted
   to EPA must contain post-1990 test data for dioxins/furans for all   
   MWC units at large plants under the extended schedule. (See Sec.     
   60.21(h) of subpart B of 40 CFR 60 for additional information        
   relating to measurable and enforceable incremental steps of progress 
   toward compliance).                                                  
 Small MWC plants                                               
  State plans must require full                                         
   compliance or closure with                                           
   regulatory requirements in 3 years                                   
   or less following issuance of a                                      
   revised construction or operation                                    
   permit if a permit modification is                                   
   required, or within 3 years                                          
   following EPA approval of the State                                  
   plan if a permit modification is not                                 
   required.                                                            
 State plans are required to specify that all MWC's at large MWC
 plants for which construction was commenced after June 26, 1987 comply 
 with the guidelines for Hg and dioxins/furans within 1 year following  
 issuance of a revised construction or operation permit if a permit     
 modification is required, or within 1 year following EPA approval of   
 the State plan, whichever is later.                                    
 State plans are required to                                    
 specify that owners or operators of                                    
 MWC's comply with the operator                                         
 training and certification                                             
 requirements by 6 months after startup                                 
 or 1 year after State plan approval by                                 
 the EPA, whichever is later, for large                                 
 plants and by 6 months after startup                                   
 or 18 months after State plan approval                                 
 by the EPA, whichever is later, for                                    
 small plants.                                                          
*=significant change since proposal, and the change is discussed in this
  preamble.                                                             
a All concentration levels in the table are converted to 7 percent O2,  
  dry basis.                                                            
b State plans may allow NOX emissions averaging between existing MWC    
  units at a large MWC plant. The daily weighted average NOX emissions  
  concentration from the MWC units included in the emissions averaging  
  plan must comply with the following 24-hour limits: 180 ppmv for mass 
  burn waterwall combustors; 220 ppmv for mass burn rotary waterwall    
  combustors; 230 ppmv for refuse-derived fuel combustors; 220 ppmv for 
  fluidized bed combustors; and 180 ppmv for other combustor types      
  (excluding mass burn refractory combustors). Refer to the regulatory  
  text of the emission guidelines for additional requirements. State    
  plans may also establish a program to allow emissions trading between 
  non-contiguous MWC plants. Such a program shall meet the requirements 
  of the Open Market Trading Rule of Ozone Smog Precursors, proposed    
  August 3, 1995 (60 FR 39668) as finally promulgated.                  
c Although not part of the dioxin/furan limit, the dioxin/furan total   
  mass limits of 30 ng/dscm, 60 ng/dscm, and 125 ng/dscm are equal to   
  about 0.3 to 0.8 ng/dscm TEQ, 0.7 to 1.4 ng/dscm TEQ, and 1.7 to 2.9  
  ng/dscm TEQ, respectively. The optional reduced testing limits of 15  
  ng/dscm and 30 ng/dscm total mass are equal to about 0.1 to 0.3 ng/   
  dscm TEQ and 0.3 to 0.8 ng/dscm TEQ, respectively.                    

  
[[Page 65401]]

B. Significant Issues and Changes to the Proposed Guidelines

    The most significant changes to the proposed guidelines are 
discussed below. Rationales for these changes as well as other changes 
not discussed below are provided in the promulgation BID (EPA-453/R-95-
0136). Issues not discussed below include additional changes to GCP 
requirements, monitoring requirements, recordkeeping and reporting 
requirements, and compliance schedules.
    1. Designated Facilities
    Under the final guidelines, any medical, municipal, industrial 
manufacturing, or other type of waste combustion plant capable of 
combusting greater than 35 Mg/day MSW but actually combusting less than 
10 Mg/day of MSW is not a designated facility, as long as the plant 
submits an initial report and keeps certain records. This exemption was 
not included in the proposed guidelines. This exemption is identical to 
the exemption in the standards for new sources. Section IV.B.1 provides 
further discussion of the exemption.
    Under the final guidelines, a cofired combustor is defined as a 
unit combusting a fuel feed stream 30 percent or less MSW, as measured 
on a calendar quarterly basis. At proposal, determination of status as 
a cofired combustor was measured on a daily basis. This change is 
identical to the change made in the standards. Refer to section IV.B.1 
for further discussion on the change.
    The initial reporting requirement in the proposed guidelines for 
MWC plants with combustion capacity greater than 25 Mg/day but less 
than or equal to 35 Mg/day is not included in the final guidelines. 
Both the proposed and final guidelines exempt plants with capacity less 
than 35 Mg/day. Also, an exemption for combustion of clean wood or 
clean wood products is included in the final guidelines. This exemption 
is identical to the exemption in the standards. Refer to section IV.B.1 
for discussion of EPA's rationale for this exemption.
2. Emission Limits for MWC Metals, Acid Gases, Organics, and Nitrogen 
Oxides, and Ash Fugitive Emissions
    For existing MWC's, the MACT floor levels and the emission limits 
for several pollutants have been revised since proposal. See the 
proposal preamble (59 FR 48228, September 20, 1994), the promulgation 
BID (EPA-453/R-95-0136), and docket A-90-45 for additional details on 
the MACT floor analysis methodology and the selection of MACT.
    Since proposal, the EPA revised the MACT floors for existing plants 
based on new permit information received and an updated inventory of 
operating MWC plants. This revision resulted in revised MACT floor 
levels for various pollutants for small and large MWC plants. The 
revised MACT floor pollutant levels for large plants have resulted in 
more stringent MACT emission limits for SO2, HCl, and Pb. In 
addition, the revised MACT floors and emission limits for NOX for 
large plants include emission levels based on combustor type. Revisions 
to the MACT floor that resulted in revisions to the selected MACT level 
of control for specific pollutants are discussed below.
    While the final emission limits are somewhat different from 
proposal, the limits can be achieved using the same control 
technologies that were the basis of the proposed emission limits. The 
technology bases for large and small plants are summarized in table 3.
    a. MWC Acid Gases. Based on the new information and test data 
received after proposal and the revised MACT floor analysis, the EPA 
revised the MACT limits for SO2 and HCl for the final guidelines 
for large plants.
    The revised SO2 MACT floor for large plants is 31 ppmv. The 
final SO2 emission limit for large plants, which was set at the 
MACT floor level of 35 ppmv at proposal, is 31 ppmv because of the 
change in the MACT floor at promulgation.
    The MACT-based SO2 limit of 80 ppmv for small plants has not 
changed from proposal; however, the SO2 MACT floor for small 
plants is revised to 98 ppmv. Because the revised floor is more 
stringent than the proposal floor (the floor at proposal was 118 ppmv), 
the EPA's conclusion that acid gas controls will be needed to achieve 
the floor remains the same. In addition, the EPA's conclusion that a 
lower emission rate of 80 ppmv is achievable at minimal cost also 
remains the same. Therefore, the final SO2 emission limit for 
small plants remains at 80 ppmv.
    The revised HCl MACT floor for large plants is 31 ppmv. The final 
HCl emission limit for large plants, which was set at the MACT floor 
level of 35 ppmv at proposal, is 31 ppmv because of the change in the 
MACT floor at promulgation.
    b. MWC Metals. Based on the new information and test data received 
after proposal and the revised MACT floor analysis, the Pb limit for 
large plants was revised for the final guidelines. The proposed Pb MACT 
emission level for large plants was 0.50 mg/dscm; however, the revised 
Pb MACT floor emission level for large plants is 0.49 mg/dscm. 
Therefore, the final Pb emission limit for large plants has been 
revised to 0.49 mg/dscm.
    c. MWC Organics. The dioxin/furan emission limits for large and 
small plants were revised since proposal. The MACT floor for dioxins/
furans for MWC's at large plants is 126 ng/dscm total mass. As 
documented in the preambles to these proposed guidelines (59 FR 48228, 
September 20, 1994) and the promulgated subpart Ca guidelines (56 FR 
5514, February 11, 1991), in combination with GCP, SD/ESP systems can 
achieve dioxin/furan total mass emissions of 60 ng/dscm and SD/FF 
systems can achieve dioxin/furan total mass emissions of 30 ng/dscm. 
Therefore, the MACT floor of 126 ng/dscm can be achieved with either 
SD/ESP or SD/FF systems.
    When determining the final MACT standard (which may be more 
stringent than the MACT floor), section 129(a)(2) requires the 
Administrator to consider certain factors, including the cost of 
achieving the emission reduction. In the Administrator's judgment, it 
would be prohibitively expensive and unreasonable to require existing 
MWC's with ESP's that can meet a dioxin/furan emission limit of 60 ng/
dscm to retrofit an SD/FF in order to achieve an additional 30 ng/dscm 
reduction in emissions. For example, at a typical 1,400 Mg/day MWC 
plant already equipped with an SD/ESP, the capital cost to remove the 
ESP and retrofit a new FF would be about $14 million. This cost would 
be in addition to paying the remaining debt for a relatively new ESP 
(about $5 million including interest payments) and would result in a 
relatively small increase in control device efficiency.
    For the final rule, the Administrator considered several regulatory 
options more stringent than the MACT floor; however, because of this 
high pollution control device retrofit cost, the Administrator decided 
to set separate MACT limits for MWC's with ESP-based control systems 
and MWC's with nonESP-based control systems. For MWC's with ESP-based 
control systems, the EPA selected a MACT level of 60 ng/dscm total 
mass, based on the performance of SD/ESP systems. For MWC's using or 
retrofitting nonESP-based control systems, the EPA selected a MACT 
level of 30 ng/dscm total mass, based on the performance of SD/FF 
systems. The number of MWC plants that will comply by using an SD/ESP 
will be limited (only about 10 percent of the MWC plants). The vast 
majority of MWC's are expected to use SD/FF systems to comply. 

[[Page 65402]]

    The MACT floor for dioxins/furans at small MWC plants is 1,500 ng/
dscm total mass. As with large MWC plants, the final emission 
guidelines limit for dioxins/furans is more stringent than the MACT 
floor. The final guideline limit for dioxins/furans at small MWC plants 
is 125 ng/dscm total mass and is based on DSI/ESP technology.
    The final MACT limit for Hg is based on use of activated carbon 
injection. Activated carbon injection technology used in combination 
with DSI/ESP, SD/ESP, or SD/FF technology is expected to result in 
supplemental dioxin/furan control, reducing dioxin/furan emissions from 
these control systems by more than 50 percent. The final MACT guideline 
levels for dioxins/furans for existing units at small and large plants 
do not consider supplemental dioxin/furan control from activated carbon 
injection because an insufficient amount of emissions data exist to 
adequately determine the performance level of activated carbon 
injection retrofitted to existing MWC air pollution control systems. 
Nonetheless, it is expected that the use of activated carbon injection 
will result in additional reduction of dioxins/furans to levels below 
the emission limits in the final guidelines.
    As with the standards for new MWC's, the final guidelines include a 
provision that allows less frequent dioxin/furan testing if a plant is 
achieving a significantly lower level of dioxin/furan emissions (15 ng/
dscm for MWC's at large plants and 30 ng/dscm for MWC's at small 
plants). This option will encourage optimal performance and minimal 
emissions. Refer to section IV.B.7 for a description of the alternative 
testing schedule.
    Relative to the proposal, the optional TEQ format of the proposed 
dioxin/furan emission limits was removed in the final standards, as 
explained in section IV.B.2.c. Although not part of the dioxin/furan 
limit, the dioxin/furan total mass limits of 30 ng/dscm, 60 ng/dscm, 
and 125 ng/dscm are equal to about 0.3 to 0.8 ng/dscm TEQ, 0.7 to 1.4 
ng/dscm TEQ, and 1.7 to 2.9 ng/dscm TEQ, respectively.
    d. Nitrogen Oxides. After considering data submitted by commenters 
regarding requiring SNCR for MWC units at large plants where some could 
already achieve the MACT floor level without SNCR, the EPA changed the 
proposed NOX emission limit of 180 ppmv for all large plants. The 
NOX MACT floor was revised by calculating the MACT floor 
separately for each subcategory of combustor type, and the MACT limits 
are being promulgated at levels equivalent to the MACT floors for each 
combustor type. The final guideline MACT limits are: 200 ppmv for mass 
burn waterwall combustors; 250 ppmv for refuse-derived fuel combustors; 
250 ppmv for mass burn rotary waterwall combustors; 240 ppmv for 
fluidized bed combustors; no limit for mass burn refractory combustors; 
and 200 ppmv for other combustors not listed above.
    In addition, the EPA has revised the emission guidelines to allow 
States to include in their State plans options for averaging of 
emissions from units within a large MWC plant, and for trading 
emissions between MWC plants. The plant average emission limits for 
units being included in an emissions averaging plan within a plant are 
approximately 10 percent less than the MACT limits for each combustor 
type, as follows: 180 ppmv for mass burn waterwall combustors; 220 ppmv 
for mass burn rotary waterwall combustors; 230 ppmv for refuse-derived 
fuel combustors; 220 ppmv for fluidized bed combustors; and 180 ppmv 
for other combustor types (excluding mass burn rotary refractory 
combustors). Emissions trading between units at noncontiguous plants 
must be consistent with the requirements of the Open Market Trading 
Rule for Ozone Smog Precursors, proposed August 3, 1995 (60 FR 39668), 
as finally promulgated. Until the Open Market trading rule is 
finalized, it is not possible to reference the rule in the guidelines 
text. In the interim, the guideline text indicates NOX emissions 
trading must be approved by the Administrator prior to implementation. 
After the Open Market Trading Rule is finalized, it is preapproved for 
use under the guidelines.
    e. Fugitive Ash Emissions. The emission limit for fugitive ash 
emissions under the final guidelines is visible emissions no more than 
5 percent of the time from ash conveying and transfer systems at MWC's. 
An exemption for maintenance and repair activities has been added. 
These same changes were made to the standards for new sources. See the 
discussion of the standards in section IV.B.2.e for an explanation of 
the reasons for these changes.
3. Good Combustion Practices
    The final CO guidelines include an additional category of combustor 
technology referred to as ``spreader stoker coal/RDF mixed fuel-fired 
combustors,'' which is assigned the same CO limit and averaging time as 
the RDF stoker combustor category (200 ppmv, 24-hour averaging time). 
In the final guidelines, the category of combustors referred to in the 
proposal as ``coal/RDF mixed fuel-fired combustors'' was revised to 
``pulverized coal/RDF mixed fuel-fired combustors,'' and the CO limit 
and averaging time remains the same as proposed (150 ppmv, 4-hour 
averaging time). These same changes were made to the standards for new 
sources. See the discussion of the standards in section IV.B.3 for an 
explanation of the reasons for these changes.
4. Operator Training and Certification
    As discussed in section IV.B.4 for the standards for new sources, 
the EPA has clarified the provisional certification requirements and 
revised the schedule for full certification of chief facility operators 
and shift supervisors to allow sufficient time to schedule exams. As 
stated in the proposal preamble, a State-approved ASME-equivalent 
certification program may be substituted for ASME certification.
    For large plants, the final guidelines specify that a State plan 
must require chief facility operators and shift supervisors to obtain 
ASME provisional certification by 1 year after State plan approval or 6 
months after startup, whichever is later. In addition, a State plan 
must require that, by the same date, these personnel obtain full 
certification or be scheduled with ASME to take the ASME full 
certification exam (instead of actually obtaining full certification 
within 1 year as proposed).
    For small plants, the final guidelines specify that a State plan 
must require chief facility operators and shift supervisors to obtain 
ASME provisional certification by 18 months after State plan approval 
or 6 months after startup, whichever is later. In addition, a State 
plan must require that, by the same date, these personnel obtain full 
certification or be scheduled with ASME to take the ASME full 
certification exam (instead of actually obtaining full certification 
within 1 year as proposed).
5. Air Curtain Incinerators
    No changes were made to the proposed guidelines for air curtain 
incinerators. As discussed in section V.B.1, the final guidelines do 
not cover combustion of clean wood; therefore, air curtain incinerators 
combusting only clean wood are not covered by the guidelines.
6. Compliance and Performance Testing
    Under the final guidelines, State plans must specify that all 
plants are required to perform annual performance testing for dioxin/
furan emissions. However, a provision for less frequent testing has 
been added to encourage plants to 

[[Page 65403]]
optimize performance and achieve emission levels significantly lower 
than the dioxin/furan emission limits in the final guidelines. State 
plans may require that, to take advantage of this provision, existing 
MWC's must meet a dioxin/furan level of 15 ng/dscm (large plants) or 30 
ng/dscm (small plants), for 2 consecutive years. Refer to the 
discussion on the standards for new MWC's under section IV.B.7 for a 
description of this reduced testing schedule.
7. Reporting and Recordkeeping Requirements and Compliance Schedules
    Reporting requirements have been changed from quarterly to annual 
(semiannual if exceeding the emission limit for any pollutant) to 
reduce the economic burden on MWC's. Refer to section IV.B.8 for an 
explanation of the reasons for this change.
    The EPA revised the proposed compliance schedule for large and 
small plants to allow more time for small plants to comply with the 
guidelines and to clarify the schedule for plants that select to close 
down operation rather than retrofit to comply with the guidelines. The 
final compliance schedule is as follows. For large MWC plants, State 
plans may allow three alternative compliance schedules: (1) Full 
compliance or closure within 1 year following approval of the State 
plan; (2) full compliance in 1 to 3 years following issuance of a 
revised construction or operation permit if a permit modification is 
required or 1 to 3 years following approval of the State plan if a 
permit modification is not required, provided the State plan includes 
measurable and enforceable incremental steps of progress toward 
compliance; or (3) closure in 1 to 3 years following approval of the 
State plan, provided the State plan includes a closure agreement. If a 
State plan allows the second or third scheduling options (i.e., more 
than 1 year), the State plan submitted to EPA must include post-1990 
test data for dioxins/furans for all MWC units at large plants under 
the schedule. For small MWC plants, State plans must require full 
compliance or closure in up to 3 years following issuance of a revised 
construction or operation permit if a permit modification is required, 
or 3 years following approval of the State plan if a permit 
modification is not required.

C. Impacts of the Guidelines

    The final guidelines can be achieved by designated facilities that 
utilize the same control technologies that were the basis for the 
proposed guidelines. The basis for the MACT guidelines selected at both 
proposal and promulgation is GCP/SD/ESP(or FF)/SNCR and carbon 
injection for large plants and GCP/DSI/ESP and carbon injection for 
small plants. Because the technology basis for the final guidelines is 
the same as at proposal, the impacts analysis presented at proposal has 
not been revised for the promulgated rule. Table 4 provides a brief 
summary of the air and cost impacts of the guidelines. The summary in 
table 4 provides impacts estimates based on two baseline scenarios: A 
pre-1989 baseline (control level prior to the 1991 subpart Ca 
guidelines) and a 1991 baseline (control level after the 1991 subpart 
Ca guidelines.) Refer to the preamble to the proposed guidelines (59 FR 
48228) for a detailed summary of these air and control cost impacts, as 
well as a discussion of the water, solid waste, energy, and economic 
impacts of the guidelines.

                 Table 4.--Impacts of the 1991 Subpart Ca and Promulgated Subpart Cb Guidelines                 
----------------------------------------------------------------------------------------------------------------
                                                                                                  Increment of  
                                                                                                promulgated 1995
                                                          1991 subpart Ca    Promulgated 1995      subpart Cb   
                       Parameter                            guidelines a        subpart Cb      guidelines over 
                                                                               guidelines a     the 1991 subpart
                                                                                                Ca guidelines b 
----------------------------------------------------------------------------------------------------------------
Characteristics of Existing MWC's:                                                                              
  Combustion capacity (10 \6\ Mg/yr)...................              35.9               39.0                3.1 
  Number of MWC plants.................................             158                179                 21   
Cost (1990 Dollars):                                                                                            
  Capital cost ($10 \6\)...............................             888              2,100              1,212   
  Annualized cost ($10 \6\/yr).........................             168                445                277   
  Average cost increase ($/Mg MSW combusted)...........               6.40              13.60               7.20
Annual Emissions Reduction (Mg/yr):                                                                             
  SO2..................................................          25,000             43,000             18,000   
  HCl..................................................          36,000             56,000             20,000   
  PM...................................................           1,100              3,100              2,000   
  Cd...................................................               2                  5                  3   
  Pb...................................................              30                 83                 53   
  Hg...................................................              11                 47                 36   
  NOX..................................................               0             19,000             19,000   
      Total dioxins/furans (kg/yr).....................             117                157                 40   
----------------------------------------------------------------------------------------------------------------
a The impacts are based on a pre-1989 baseline (i.e., a baseline prior to the effective date of the subpart Ca  
  guidelines).                                                                                                  
b The impacts are calculated by subtracting the impacts of the 1991 subpart Ca guidelines from the impacts of   
  the promulgated 1995 subpart Cb guidelines (based on a pre-1989 baseline).                                    

    The national impacts estimates provided in table 4 and discussed in 
the proposal preamble represent EPA's estimate of the upper limit of 
impacts that would result from implementation of the guidelines. To the 
extent that any existing MWC's close rather than comply with the 
guidelines or switch to other disposal options that may cost less, the 
national costs will be lower and air emissions will be less.
    A number of comments were received on the possible effects on EPA's 
costing analysis following the recent Supreme Court decision that 
``flow control'' is unconstitutional. The EPA considered the effect of 
flow control on the financing of existing MWC's. In summary, the EPA 
finds that if MWC's raise tipping fees to cover the increased costs of 
these regulations, then the lack of ``flow control'' will likely result 
in a shift of some wastes to other disposal options. The combined 
impacts of no flow control and increased tipping fees on individual 
MWC's and municipalities are likely to be very 

[[Page 65404]]
place-specific depending on the relative tipping fees of MWC's and 
other disposal options, transportation costs, and institutional 
factors. If tipping fees are not raised to offset emission control 
costs, then operators of MWC's will have to finance the costs of the 
regulations out of current revenues.
    The EPA has identified several ways that State and local 
governments can guarantee a continued source of MSW for the MWC's and 
provide funds from the general revenue to support the operation of MWC 
facilities, accomplishing some of the outcomes that flow control can 
produce, including: (1) Government provision of collection services; 
(2) contractor provision of collection services under government 
contract; (3) franchising collection and hauling to designated 
facilities; (4) subsidizing facilities from the general revenues; and 
(5) supporting integrated solid waste management programs from the 
general revenue.

VI. Administrative Requirements

    This section addresses the following administrative requirements: 
Docket, Paperwork Reduction Act, Executive Orders 12866 and 12875, 
Unfunded Mandates Act, Regulatory Flexibility Act, and Clean Air Act 
Procedural Requirements.

A. Docket

    The docket is an organized and complete file of all the information 
considered in the development of this rulemaking. The principal 
purposes of the docket are: (1) To allow interested parties to identify 
and locate documents so that they can effectively participate in the 
rulemaking process; and (2) to serve as the record in case of judicial 
review, except for interagency review material. 42 U.S.C. 
Sec. 7607(d)(7)(A). The docket number for this rulemaking is A-90-45. 
Docket No. A-89-08 also includes background information for this 
rulemaking that supported the proposal and promulgation of the subpart 
Ea standards and subpart Ca guidelines.

B. Paperwork Reduction Act

    The information collection requirements in this rule have been 
submitted for approval to the Office of Management and Budget (OMB) 
under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. An 
Information Collection Request (ICR) document has been prepared by EPA 
(ICR No. 1506.5) and a copy may be obtained from Sandy Farmer, OPPE 
Regulatory Information Division; U.S. Environmental Protection Agency 
(2136); 401 M St., S.W.; Washington, DC 20460 or by calling (202) 260-
2740. This ICR document is also available on the EPA's TTN Clean Air 
Act Amendments electronic bulletin board. See the SUPPLEMENTARY 
INFORMATION section of this preamble for information on accessing EPA's 
TTN electronic bulletin board.
    The information required to be collected by this rule is necessary 
to identify the regulated entities who are subject to the rule and to 
ensure their compliance with the rule. The recordkeeping and reporting 
requirements are mandatory and are being established under authority of 
Section 114 of the Act. All information submitted as part of a report 
to the Agency for which a claim of confidentiality is made will be 
safeguarded according to the Agency policies set forth in Title 40, 
Chapter 1, part 2, subpart B--Confidentiality of Business Information 
(see 40 CFR 2; 41 FR 36902, September 1, 1976, amended by 43 FR 39999, 
September 28, 1978; 43 FR 42251, September 28, 1978; 44 FR 17674, March 
23, 1979).
    The annual reporting and recordkeeping burden presented in this ICR 
document reflects only part of the burden imposed by this rule. The 
rest of the burden was presented to and approved by the OMB in an ICR 
document in 1991 for the subpart Ea NSPS promulgated in February 1991. 
The ICR document that accompanied the subpart Ea rulemaking summarized 
the reporting and recordkeeping requirements that MWC owners and 
operators of large MWC units are required to follow to demonstrate 
compliance with the 1991 NSPS. As explained elsewhere in this document, 
the Clean Air Act Amendments were passed by Congress in 1990, and they 
included section 129 that directs the Administrator to extend the NSPS 
to small MWC plants, as well as to include emission limits for 
additional pollutants and siting requirements. This ICR document for 
subpart Eb presents this additional burden imposed by section 129 of 
the Act, by summarizing the total annual burden on small plants (i.e., 
for the reporting and recordkeeping requirements associated with all 
pollutant emission limits and siting) and the additional annual burden 
on large MWC plants (i.e., only for requirements associated with Cd, 
Pb, Hg, and fugitive ash emission limits and siting).
    The total annual reporting and recordkeeping burden summarized in 
this ICR document for this collection averaged over the first 3 years 
of NSPS application to new MWC's is estimated to be about 69,700 person 
hours per year. This would be the estimated annual burden for 64 
respondents (i.e., MWC units). This is a worst-case burden estimate, as 
discussed under section IV.C. If fewer MWC units are constructed than 
have been projected, then the burden will be less than reported here. 
The average burden per respondent is about 1,100 person hours per year. 
The rule requires an initial one-time notification from each new MWC 
regarding all pollutant emission levels and siting and subsequent 
annual compliance reports regarding all pollutant emission levels. 
Additionally, if any of the pollutant emission limits are exceeded, 
respondents would be required to submit semi-annual reports. The rule 
includes continuous monitoring requirements for SO2, opacity, CO, 
CO2, O2 and annual stack testing requirements for PM, 
dioxins/furans, opacity, HCl, Cd, Pb, Hg, and fugitive ash. Efforts 
were made to reduce the burden on small plants by allowing them to test 
emissions once every 3 years instead of annually if they demonstrate 
that they consistently meet the emissions requirements. This burden 
estimate includes the time needed to review instructions; develop, 
acquire, install, and utilize technology and systems for the purposes 
of collecting, validating, and verifying information, processing and 
maintaining information, and disclosing and providing information; 
adjust the existing ways to comply with any previously applicable 
instructions and requirements; train personnel to be able to respond to 
a collection of information; search data sources; complete and review 
the collection of information; and transmit or otherwise disclose the 
information.
    Comments on the ICR document are requested, including the Agency's 
need for the information presented in this ICR document, the accuracy 
of the provided burden estimates, and any suggested methods for 
minimizing respondent burden. Send comments on the ICR to the Director, 
OPPE Regulatory Information Division; U.S. Environmental Protection 
Agency (2136); 401 M St. S.W.; Washington, DC 20460; and to the Office 
of Information and Regulatory Affairs, Office of Management and Budget, 
725 17th St. N.W.; Washington, DC 20503; marked ``Attention: Desk 
Officer for EPA''. Include the ICR number in any correspondence. Since 
the OMB is required to make a decision concerning the ICR between 30 
and 60 days after December 19, 1995, a comment to OMB is best assured 
of having its full effect if OMB receives it by January 18, 1996. The 
EPA will publish a response to 

[[Page 65405]]
OMB and public comments on the information collection requirements 
contained in this proposal in a subsequent Federal Register notice.

C. Executive Order 12866

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the EPA 
must determine whether the regulatory action is ``significant,'' and 
therefore, subject to OMB review and the requirements of the Executive 
Order. The Order defines ``significant'' regulatory action as one that 
is likely to lead to a rule that may:
    (1) Have an annual effect on the economy of $100 million or more, 
or adversely affect in a material way the economy, a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety, or State, local or tribal governments or communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    Pursuant to the terms of Executive Order 12866, the promulgated 
standards for new sources will not be a ``significant'' rule because 
the annual effect on the economy is expected not to exceed $43 million 
over the cost of the existing subpart Ea standards. However, the EPA 
considers these promulgated standards to be ``significant'' because of 
their relationship to the guidelines for MWC's that are also being 
promulgated today. The final guidelines will cost $450 million per year 
or less based on a baseline prior to the effective date of the subpart 
Ea standards. As such, this action was submitted to OMB for review. 
Changes made in response to OMB suggestions or recommendations are 
documented in the public docket for this rulemaking.

D. Unfunded Mandates Act

    Under section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, the EPA 
must prepare a statement to accompany any rule where the estimated 
costs to State, local, or tribal governments, or to the private sector, 
will be $100 million or more in any 1 year. Section 203 requires the 
EPA to establish a plan for informing and advising any small 
governments that may be significantly or uniquely impacted by the rule. 
Under section 205(a), the EPA generally must select the ``least costly, 
most cost-effective or least burdensome alternative that achieves the 
objectives of the rule'' and is consistent with statutory requirements. 
The EPA has complied with section 205 of the Unfunded Mandates Act, by 
promulgating a rule that is the most cost-effective alternative for 
regulation of these sources that meets the statutory requirements under 
the Clean Air Act. For Hg and dioxins/furans, the EPA adopted standards 
that are more stringent than the MACT floor level of control. In the 
case of dioxins/furans, the EPA concluded that a standard more 
stringent than the MACT floor can be achieved at little or no cost, and 
thus represents the most cost-effective control. In the case of Hg, the 
MACT floor emissions level is equal to current uncontrolled levels. 
However, the EPA concluded, after considering the requisite factors in 
section 129(a)(2), that an uncontrolled floor level could not be 
justified under the Clean Air Act and that a more stringent emissions 
standard based on the use of carbon injection as an add-on control 
would be cost-effective. The EPA was unable in this rulemaking to 
identify any alternatives other than carbon injection for control of Hg 
emissions. To the extent that section 205(a) of the Unfunded Mandates 
Reform Act (UMRA) may be read to have the EPA consider a less stringent 
level of Hg control, the EPA concluded that such an alternative would 
be ``inconsistent with law'' within the meaning of section 205(b)(2) of 
the UMRA. Accordingly, the alternative selected for Hg is the most 
cost-effective one available under these circumstances.
    The unfunded mandates statement under section 202 must include: (1) 
A citation of the statutory authority under which the rule is proposed, 
(2) an assessment of the costs and benefits of the rule including the 
effect of the mandate on health, safety and the environment, and the 
Federal resources available to defray the costs, (3) where feasible, 
estimates of future compliance costs and disproportionate impacts upon 
particular geographic or social segments of the nation or industry, (4) 
where relevant, an estimate of the effect on the national economy, and 
(5) a description of the EPA's consultation with State, local, and 
tribal officials.
    Since this rule is estimated to impose costs to the private sector 
and government entities in excess of $100 million, the EPA has prepared 
the following statement with respect to these impacts.
1. Statutory Authority
    The statutory authority for this rulemaking, sections 111 and 129 
of the Clean Air Act, is fully discussed in section II of this 
preamble. The rule establishes emission guidelines for existing MWC's 
and standards of performance for new MWC's.
    Section 129(a)(2) requires the Administrator to promulgate 
standards for new solid waste incinerator units and emission guidelines 
for existing units that ``reflect the maximum degree of reduction in 
emissions of air pollutants listed under section (a)(4) that the 
Administrator, taking into consideration the cost of achieving such 
emission reduction, and any non-air-quality health and environmental 
impacts and energy requirements, determines is achievable for new or 
existing units in each category. The Administrator may distinguish 
among classes, types (including mass-burn, refuse-derived fuel, modular 
and other types of units), and sizes of units within a category in 
establishing such standards * * *'' 42 U.S.C Sec. 7429(a)(2) (emphasis 
added). This is commonly referred to as maximum achievable control 
technology, or MACT. Section 129(a)(2) further defines a minimum level 
of stringency that can be considered for MACT standards--commonly 
referred to as the MACT floor--which for new units, is the level of 
control achieved by the best controlled similar unit, and for existing 
units, is the level of control achieved by the average of the best 
performing 12 percent of units in the category. Id.
    In the final rule, the Administrator determined for new MWC's that 
MACT for all pollutants was equivalent to the pollutants' MACT floor 
levels--i.e., the MACT floor levels reflect the maximum achievable, 
cost-effective reduction in emissions of the air pollutants specified 
in section 129(a)(4) of the Clean Air Act. The promulgated MACT levels 
reflect the performance of emission control technology that is in 
commercial use at the best controlled similar source (i.e., an MWC 
equipped with an SD/FF system, carbon injection, and SNCR, in 
combination with GCP's). The September 20, 1994 proposed standards were 
more stringent than the MACT floor levels because the proposed levels 
were based on carbon injection technology, which was not in commercial 
use at the time of proposal. Since proposal, a dozen MWC units equipped 
with carbon injection technology have initiated operation; thus, the 
best controlled similar unit in the final rule includes carbon 
injection (i.e., basis for the MACT floor).

[[Page 65406]]

    For existing MWC's, some of the emission limits included in the 
emission guidelines promulgated today are the same as the final MACT 
floor levels. For several pollutants, however, the Administrator 
decided, consistent with section 129(a)(2) after considering costs and 
non-air-quality health and environmental impacts and energy 
requirements, to set MACT standards more stringent than the MACT floor, 
since more stringent levels could be achieved at either no additional 
cost, or minimal costs. The MACT floor levels for acid gases and PM are 
stringent enough for existing units at both small and large plants that 
they require an acid gas/PM control system. Since an acid gas/PM 
control system also controls emissions of all regulated pollutants 
except Hg and NOx, establishing emission limits for acid gases and 
PM effectively establishes emission limits for the other pollutants 
(except Hg and NOx). The cost to comply with the selected emission 
limits relative to the cost of the acid gas/PM control system are 
minimal.
    For example, the same acid gas/PM control system that owners and 
operators of MWC's need to meet the MACT emissions guideline levels for 
SO2 and PM also controls dioxins/furans to levels more stringent 
than the dioxin/furan MACT floor level. Thus, the Administrator 
determined that the final dioxin/furan emission guidelines may be 
achieved at no additional control costs. In the final rule, for MWC's 
at large plants, the Administrator distinguished between the dioxin/
furan emission guidelines for MWC's equipped with ESP-based control 
systems and MWC's equipped with nonESP-based control systems. In the 
Administrator's judgment, it would be prohibitively expensive and 
unreasonable to require existing ESP's that can meet a limit of 60 ng/
dscm to retrofit an SD/FF in order to achieve additional reduction in 
emissions beyond the MACT floor (see the proposal preamble, 50 FR 
48228, September 20, 1994, for a more detailed discussion). For the 
final rule, the Administrator considered several regulatory options 
more stringent than the MACT floor; however, because of the high cost 
of pollution control device retrofit, the Administrator determined that 
MACT for dioxins/furans emitted from MWC's with ESP-based control 
systems is 60 ng/dscm, and MACT for dioxins/furans emitted from MWC's 
with SD/FF systems is 30 ng/dscm.
    The MACT floor for Hg is 0.36 mg/dscm, and MACT for Hg is more 
stringent than the MACT floor at a level of 0.080 mg/dscm. To achieve 
the Hg emission limit in the emission guidelines, carbon injection will 
be required (this exceeds MACT floor requirements). Because of the 
toxicity and bioaccumulation potential of Hg, the Administrator 
considered the small cost of adding Hg control to be cost-effective. 
The cost of Hg control is about $0.25 to $0.35 per gram Hg removed 
($250,000 to $350,000 per Mg), which translates to approximately $0.05 
to $0.07 per month for a household served by an MWC.
2. Social Costs and Benefits
    This assessment of the cost and benefits to State, local, and 
tribal governments of the guidelines is based on EPA's ``Economic 
Impact Analysis for Proposed Emission Standards and Guidelines for 
Municipal Solid Waste Combustors.'' Measuring the social costs of the 
guidelines requires identification of the affected entities by 
ownership (public or private), consideration of regulatory 
alternatives, calculation of the regulatory compliance costs for each 
affected entity, and assessment of the market implications of the 
additional pollution control costs. Calculating the social benefits of 
the guidelines requires estimating the anticipated reductions in 
emissions at MWC's due to regulation, identification of the harmful 
effects of exposure to MWC emissions, and valuing the expected 
reductions in these damages to society.
    a. Affected Entities. For 1996, the base year of the analysis, 
there are 179 MWC's in the population of operational facilities 
affected by the guidelines. Of this total, 100 are publicly owned and 
operated (i.e., facilities owned by State or local governments). There 
are no MWC's currently owned, or expected to be owned in the near 
future, by tribal governments, so there is no impact on tribal 
governments. The remaining 79 MWC's are privately owned and operated. 
The EPA developed 16 model plants to characterize the existing 
facilities based on the technologies used for combustion and air 
pollution control at baseline. Table 5 shows the distribution of 
publicly and privately owned MWC's and the estimated MSW volumes 
managed by the existing MWC model plants. Of the 100 publicly owned and 
operated MWC plants, 38 plants are located in communities with a 
population less than 50,000, 11 plants are located in communities with 
a population between 50,000 and 100,000, 21 plants are located in 
communities with a population between 100,000 and 250,000, and 30 
plants are located in communities with a population greater than 
250,000. A detailed description of the model plants used to 
characterize operational MWC's is presented in table 3-4 of the 
``Economic Impact Analysis of Proposed Emissions Standards and 
Guidelines for Municipal Waste Combustors'' (EPA-450/3-91-029, 1994).

              Table 5.--Summary of Total MSW Throughput at Public and Private MWC's by Model Plant              
----------------------------------------------------------------------------------------------------------------
                                                                          Ownership                             
                                           ---------------------------------------------------------------------
               Model planta                     Public                     Private                     Total    
                                            throughput (Mg/   Public   throughput (Mg/  Private   throughput (Mg/
                                                  yr)       share (%)        yr)       share (%)        yr)     
----------------------------------------------------------------------------------------------------------------
1.........................................         813,244     100.0                0       0.0          813,244
2.........................................       1,158,112      81.9          256,034      18.1        1,414,146
3.........................................       1,397,867     100.0                0       0.0        1,397,867
4.........................................       1,914,896      19.3        7,995,967      80.7        9,910,863
5.........................................       3,956,410      61.1        2,523,329      38.9        6,479,739
6.........................................         374,566      56.7          286,119      43.3          660,685
7.........................................       1,008,603      57.5          746,477      42.5        1,755,080
8.........................................       1,547,612      66.5          777,981      33.5        2,325,593
9.........................................         400,346      73.3          145,661      26.7          546,007
10........................................         425,552      82.5           90,472      17.5          516,024
11........................................         166,082      42.0          228,966      58.0          395,048
12........................................         284,596      72.6          107,219      27.4          391,815
14........................................         343,596      48.4          366,785      51.6          710,381
15........................................         937,280      29.2        2,277,088      70.8        3,214,368

[[Page 65407]]
                                                                                                                
16........................................          58,462       6.7          819,320      93.3          877,782
17........................................         745,501      52.9          662,673      47.1        1,408,174
                                           ---------------------------------------------------------------------
    Total:................................      15,078,823      45.9       17,737,993      54.1      32,816,816 
----------------------------------------------------------------------------------------------------------------
a There is no model plant that matches model plant #13 in the Economic Impact Analysis (EPA-450/3-91-029, March 
  1994).                                                                                                        

    b. Regulatory Alternatives Considered. The two broad categories of 
regulatory standards available include design standards and emission 
standards. Design standards specify the type of control equipment 
polluters must install, whereas emission standards specify the maximum 
quantity of a given pollutant that any one polluter may release.
    Design standards offer the least flexible approach considered in 
this analysis. Municipal waste combustors would have to install the 
specified control equipment regardless of the additional emission 
reductions achieved or the relative cost of alternative means of 
emission reductions.
    Emission standards allow greater flexibility in the methods used to 
reduce emissions. Municipal waste combustors are free to meet the 
emission limit in the manner that is least costly to them. 
Consequently, for a given level of emission reductions, emission 
standards are generally less costly than design standards. Furthermore, 
emission standards give MWC's an incentive to develop more effective 
means of controlling emissions. In addition, the Act requires the 
Administrator to promulgate emission standards unless such standards 
are not feasible. See 42 U.S.C. Secs. 7411(h) and 7429(a)(1). Since 
emission standards for MWC's are feasible, the EPA is barred from 
promulgating design standards for MWC's.
    Even though emission standards generally result in a more efficient 
allocation of costs than design standards, uniform emission standards 
can be more costly than necessary. Uniform emission standards require 
the same level of emission control of every discharger. Because 
marginal control costs differ for plants of different sizes, different 
technologies, different levels of product recovery (i.e., in the 
chemical industry), and different levels of baseline control, an 
effective solution can be reached if standards are carefully tailored 
to the special characteristics of each discharger. This type of 
standard is referred to as a differentiated standard.
    In formulating its MWC regulatory alternatives, EPA selected 
candidate regulatory alternatives that contain control limits for MWC's 
differentiated by MWC size classification. Large facilities are defined 
as MWC plants with aggregate plant capacities over 225 Mg/day. Small 
facilities are defined as MWC plants with aggregate plant capacities 
between 35 and 225 Mg/day. Plants with aggregate plant capacities less 
than 35 Mg/day are not covered by today's rulemaking. The lower size 
threshold of 35 Mg/day aggregate plant capacity for controlling MWC 
emissions under today's rulemaking was selected after reviewing the 
population distributions of MWI's and MWC's. Most incinerators at 
medical waste facilities are smaller incinerators that fire segregated 
medical waste with general hospital discards (MSW), and these 
incinerators would have the potential to be covered by today's 
rulemaking. To avoid overlap with the upcoming MWI rulemaking, this 
rulemaking includes the lower size cutoff of 35 Mg/day plant capacity 
and MWC plants with aggregate capacities less than or equal to 35 Mg/
day will be addressed under a separate rulemaking. With a lower size 
cutoff of 35 Mg/day, today's promulgated MWC rulemaking will cover over 
99 percent of the total U.S. MWC combustion capacity but will exclude 
97 percent of the total MWI combustion capacity.
    The regulatory alternatives for the two selected size 
classifications did not specify a particular control technology; 
rather, they specified emission limits that facilities would be 
required to meet. Current practice indicates that the emission 
guideline limits for acid gases, PM, and metals will likely be met with 
one of six different types of control technologies, depending on the 
applicable emission limits. Table 6 presents acid gas, PM, and metals 
control technologies listed in order of increasing efficiency.

  Table 6.--Control Technologies Associated With Acid Gas, Particulate  
                       Matter, and Metals Control                       
------------------------------------------------------------------------
                                                                        
-------------------------------------------------------------------------
                                GCP + ESP                               
                              GCP + DSI/ESP                             
                              GCP + DSI/FF                              
                              GCP + SD/ESP                              
                               GCP + SD/FF                              
------------------------------------------------------------------------

    In designing MWC regulatory alternatives, the EPA considered 
emission limits consistent with the combinations of the acid gas 
control technologies listed in table 6. Small plants may be required to 
meet one control limit and large plants another under a given 
regulatory alternative. Under the final guidelines, more stringent 
control requirements are in fact applicable to large plants than to 
small plants. This was done in an attempt to equalize the cost impact 
on small and large plants. Under the final guidelines the unit cost for 
air pollution control retrofit for large plants would be about $16 per 
Mg of waste combusted. For similar small plants the retrofit costs 
would be about $17 per Mg of waste combusted. Table 7 shows the control 
technologies evaluated for the guidelines regulatory alternatives under 
two compliance scenarios for acid gas, PM, and metals control. The 
control technology bases identified in this table are not intended to 
imply a design standard. Rather, the technology bases are identified 
only for the purpose of estimating costs and emission reductions.

                                                                        

[[Page 65408]]
 Table 7.--Emission Guidelines for Existing MWC'S: Control Technology Bases Used to Estimate the Impacts of the 
                                           Regulatory Alternatives a b                                          
----------------------------------------------------------------------------------------------------------------
                                                             Size Classification (Mg MSW/day)                   
  Regulatory alternative, and baseline  ------------------------------------------------------------------------
                  APCD                          Small (35 to 225)                    Large (over 225)           
----------------------------------------------------------------------------------------------------------------
Reg. Alt. I:                                                                                                    
  No control...........................  GCP+ESP                          GCP+SD/FF+CI+SNCR                     
  ESP (low)............................  GCP+ESP                          GCP+SD/ESP(m)+CI+SNCR                 
  SD/ESP...............................  GCP+SD/ESP                       GCP+SD/ESP(m)+CI+SNCR                 
  SD/FF................................  GCP+SD/FF                        GCP+SD/FF+CI+SNCR                     
Reg. Alt. II-A:                                                                                                 
  No control...........................  GCP+DSI/FF+CI                    GCP+SD/FF+CI+SNCR                     
  ESP (low)............................  GCP+DSI/ESP+CI                   GCP+SD/ESP(m)+CI+SNCR                 
  SD/ESP...............................  GCP+SD/ESP+CI                    GCP+SD/ESP(m)+CI+SNCR                 
  SD/FF................................  GCP+SD/FF+CI                     GCP+SD/FF+CI+SNCR                     
Reg. Alt. II-B:                                                                                                 
  No control...........................  GCP+DSI/FF+CI                    GCP+SD/FF+CI+SNCR                     
  ESP (low)............................  GCP+DSI/ESP+CI                   GCP+SD/FF+CI+SNCR                     
  SD/ESP...............................  GCP+SD/ESP+CI                    GCP+SD/ESP(m)+CI+SNCR                 
  SD/FF................................  GCP+SD/FF+CI                     GCP+SD/FF+CI+SNCR                     
Reg. Alt. III;                                                                                                  
  No control...........................  GCP+SD/FF+CI                     GCP+SD/FF+CI+SNCR                     
  ESP (low)............................  GCP+SD/FF+CI                     GCP+SD/FF+CI+SNCR                     
  SD/ESP...............................  GCP+SD/FF+CI                     GCP+SD/FF+CI+SNCR                     
  SD/FF................................  GCP+SD/FF+CI                     GCP+SD/FF+CI+SNCR                     
MACT Floor:                                                                                                     
No control.............................  GCP+DSI/FF                       GCP+SD/FF+SNCR                        
ESP (low)..............................  GCP+DSI/ESP                      GCP+SD/ESP(M)+SNCR                    
SD/ESP.................................  GCP+SD/ESP                       GCP+SD/ESP(m)+SNCR                    
SD/FF..................................  GCP+SD/FF                        GCP+SD/FF+SNCR                        
----------------------------------------------------------------------------------------------------------------
Source: This table is an extract of table 4-2 of the document entitled ``Economic Impact Analysis for Proposed  
  Emission Standards and Guidelines for Municipal Waste Combustors,'' EPA-450/3-91-029, March 1994. See         
  SUPPLEMENTARY INFORMATION for information on obtaining this document.                                         
a The MWC regulation does not mandate a specific type of control equipment. The MWC owner/operator may use any  
  control equipment that meets the emission standards. The control technologies are the projected compliance    
  strategies used as the basis for computing costs. If the MWC has equipment that is meeting or exceeding the   
  control requirements, no additional costs are incurred.                                                       
b CI=carbon injection.                                                                                          

  Table 7A.--Emission Guidelines for Existing MWC's: Emission Reductions and Annualized Costs of the Regulatory 
                                                 Alternatives a                                                 
----------------------------------------------------------------------------------------------------------------
                                                                 Regulatory alternative                         
Pollutant category (Mg/yr)/annualized --------------------------------------------------------------------------
         cost ($1990 10 6/yr)                         Reg. alt. II-  Reg. alt. II-                              
                                        Reg. alt. I         A              B        Reg. alt. III    Mact floor 
------------------------------------------------------
FR Doc. 95-30257 Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources
----------------------------------------------------------
SO2..................................     41,200         43,300         43,300         45,000         43,300    
HCl..................................     51,600         56,300         56,300         57,300         56,300    
PM...................................      3,070          3,070          3,070          3,240          3,070    
Pb...................................         74.8           74.8           91.1          102             74.8  
Cd...................................          5.24           5.24           5.56           6.02           5.24 
Hg...................................         44.7           47.5           47.5           47.5            0    
NOX..................................      8,680          8,680          8,690          8,690          8,680    
CO...................................     19,300         19,300         19,300         19,300         19,300    
Dioxins/furans (total mass)..........          0.154          0.156          0.157          0.158        b 0.153

[[Page 65409]]
                                                                                                                
Annualized cost ($1990 10 6/yr)......        412            443            448            487            425    
----------------------------------------------------------------------------------------------------------------
Source: This table is an extract of tables 5-14 and 5-21 of the document entitled ``Economic Impact Analysis for
  Proposed Emission Standards and Guidelines for Municipal Waste Combustors,'' EPA-450/3-91-029, March 1994. See
  SUPPLEMENTARY INFORMATION for information on obtaining this document.                                         
a The MWC regulation does not mandate a specific type of control equipment. The MWC owner/operator may use any  
  control equipment that meets the emission standards. The control technologies are the projected compliance    
  strategies used as the basis for computing costs. If the MWC has equipment that is meeting or exceeding the   
  control requirements, no additional costs are incurred.                                                       
b The MACT floor is regulatory alternative II-A without carbon injection for mercury and dioxin/furan control.  
  The majority of the dioxin/furan emission control is achieved by acid gas controls included in alternative II-
  A and the floor. It is assumed that adding mercury control (carbon injection) to acid gas control reduces     
  dioxin/furan emissions by at least an additional 50 percent. The dioxin/furan emission reduction estimate for 
  the MACT floor is not provided in the ``Economic Impacts Analysis.''                                          

    The regulatory alternatives represent alternative levels of control 
considered by the EPA, whereas the compliance scenarios represent 
potential alternative responses by the MWC owners and operators to the 
emission requirements. Generally speaking, the EPA assumed that MWC 
owners and operators will choose the minimum-cost control technology 
that will meet the emission requirements. However, where there is 
uncertainty regarding the actual emission limits that a particular 
control technology will achieve in practice, owners may choose a more 
conservative (and potentially more costly) compliance strategy to 
reduce the risk of noncompliance. A conservative investment decision is 
particularly likely when the investment decision affects the facility's 
ability to remain in operation (e.g., noncompliance results in plant 
shutdown), is a long-term decision, or involves a significant capital 
outlay. Consequently, we evaluate two compliance scenarios for meeting 
the acid gas, PM, and metals control requirements for existing plants 
subject to guidelines.
    A more detailed discussion of the regulatory alternatives EPA 
considered may be found in the ``Economic Impact Analysis for Proposed 
Emission Standards and Guidelines for Municipal Waste Combustors,'' 
EPA-450/3-91-029, March 1994 (see SUPPLEMENTARY INFORMATION for 
information on obtaining this document). Control alternatives were also 
developed for NOX control and Hg control. Discussion of these 
alternatives can be found in the following memos that may be obtained 
from the EPA's Air Docket, as specified in the SUPPLEMENTARY 
INFORMATION section of this preamble: (1) ``Update Report on Mercury 
Control Technologies for Municipal Waste Combustors'' prepared by K. 
Nebel and D. White, Radian Corporation, for W. Stevenson, U.S. 
Environmental Protection Agency, July 1993; (2) ``NOX Control on 
Existing MWC's,'' prepared by E. Soderberg et al., Radian Corporation, 
for W. Stevenson, U.S. Environmental Protection Agency, August 23, 
1991; (3) ``Wet Scrubbing Systems Performance and Cost,'' prepared by 
K. Nebel, et al., Radian Corporation, for W. Stevenson, U.S. 
Environmental Protection Agency, June 22, 1994; and (4) ``A Summary of 
Mercury Emissions and Applicable Control Technologies for Municipal 
Waste Combustors,'' prepared by K. Nebel and D. White, Radian 
Corporation, for W. Stevenson, U.S. Environmental Protection Agency, 
September 1991.
    c. Social Costs. The regulatory compliance costs of reducing air 
emissions from MWC's include the total and annualized capital costs; 
operating and maintenance costs; monitoring, inspection, recordkeeping, 
and reporting costs; and total annual costs. The annualized capital 
cost is calculated using a 4-percent discount rate for publicly-owned 
MWC's and an 8-percent discount rate for privately-owned MWC's. The 
total annual cost is calculated as the sum of the annualized capital 
cost; operating and maintenance costs; and the monitoring, inspection, 
recordkeeping, and reporting costs. There are no Federal funds 
available to assist State and local governments in meeting these costs.
    Table 8 provides the estimated compliance costs for the final 
regulations and their distribution across public and private MWC's. As 
shown, the national annual compliance costs for existing MWC's total 
$405.5 million, with publicly-owned facilities incurring $229.9 
million. This total both represents 56.7 percent of the estimated 
national compliance costs and forms the basis for allocating benefits 
to publicly-owned MWC's. (The analysis has assumed that benefits are 
linear with emission reductions). The level of compliance costs depends 
not only on the absolute number of facilities, but also on the baseline 
level of pollution control. It is assumed that higher compliance costs 
are associated with higher emission reductions and are, thus, 
appropriate for allocating the benefits associated with the reduced 
emissions.

        Table 8.--Summary of Regulatory Compliance Costs for Existing MWC's by Ownership ($1990, 10 \3\)        
----------------------------------------------------------------------------------------------------------------
                                                                                  Annual                        
                                                                      Annual    operating     Annual     Total  
                        Ownership category                           capital       and         MIRR      annual 
                                                                      costs    maintenance   costs a     costs  
                                                                                  costs                         
----------------------------------------------------------------------------------------------------------------
Public............................................................     67,625     154,163       8,092    229,881
Private...........................................................     83,936      87,161       4,575    175,672
                                                                   ---------------------------------------------
      Total.......................................................    151,561     241,325      12,667   405,553 
----------------------------------------------------------------------------------------------------------------
a MIRR=Monitoring, inspection, reporting, and recordkeeping.                                                    

[[Page 65410]]

    The analysis assumes that the entire increase in costs of 
combustion services for both public and private entities will be passed 
through to MWC customers in the form of increases in the tipping fee 
charged by MWC's. As shown in table 9, the estimated increases in the 
average tipping fee for publicly-owned MWC's are significant and range 
from 36 to 59 percent. The range for privately-owned MWC's is 41 to 65 
percent.

Table 9.--Average Tipping Fee In-creases for Existing MWC's by Ownership
------------------------------------------------------------------------
                                                Small MWC     Large MWC 
                                               plants (35     plants a  
                                               to 225 Mg/   (over 225 Mg/
                  Ownership                     day MSW)      day MSW)  
                                                (percent      (percent  
                                                 change)       change)  
------------------------------------------------------------------------
Public......................................           59            36 
Private.....................................           65           41  
------------------------------------------------------------------------
a Fee increases are computed using the average cost per megagram of MSW 
  reported in tables 5-10 and 5-11 of the EPA's ``Economic Impact       
  Analysis for Proposed Emission Standards and Guidelines for Municipal 
  Solid Waste Combustors,'' (EPA-450/3-91-029) and an average tipping   
  fee of $57/Mg of MSW. The average tipping fee is based on the 1993    
  average tipping fee for MWC's reported in Waste Age (Berenyi & Gould, 
  1993) converted to 1990 dollars.                                      

    Section 7.3.1 of the EPA's economic impact analysis (EPA-450/3-91-
029) provides a distributional analysis of the impacts on governmental 
entities with respect to their ability to finance the regulatory 
compliance capital through revenue bonds. A community's ability to 
finance the regulatory compliance capital through revenue bonds is 
estimated by comparing the estimated average annual cost per household 
to the average annual household income for the community. If the cost 
per household exceeds one percent of average annual household income, 
then the community is assumed to have potential difficulty issuing 
revenue bonds. Of the estimated 100 governmental entities subject to 
the guidelines, no governmental entities with a population above 50,000 
are projected to have difficulty issuing revenue bonds as a result of 
the regulation on existing sources. Overall, 3 of the 100 governmental 
entities (all 3 of which have population below 50,000) are projected to 
have difficulty issuing such bonds.
    Without market adjustments, the social costs of the guidelines 
should be equivalent to the national compliance costs shown in table 8. 
However, in this analysis, the social costs differ, both because the 
total capital costs for both public and private MWC's were discounted 
at the social rate equal to 7 percent, and because of tax differences. 
Table 10 shows the estimated social cost of the regulations and the 
distribution across public and private MWC's. The estimated annual 
social cost of the guidelines is $443 million of which 56.7 percent, or 
$251.1 million, is attributed to publicly-owned MWC's. This estimate of 
social cost is greater than the national compliance costs because the 
total capital costs for publicly-owned MWC's is discounted at the 
social rate of 7 percent, as opposed to the 4 percent rate used to 
compute the national compliance costs.

 Table 10.--Summary of Estimated Annual Social Cost by Ownership ($1990)
------------------------------------------------------------------------
                                                      Total             
                                                      social            
                Ownership category                    costs      Share  
                                                     ($10 \3\  (percent)
                                                    per year)           
------------------------------------------------------------------------
Public............................................    251,107       56.7
Private...........................................    191,893       43.3
                                                   ---------------------
      Total.......................................    443,000      100.0
------------------------------------------------------------------------

    Table 10A provides typical costs of air pollution control retrofits 
for existing MWC's. The costs shown in table 10A are for 17 model 
existing plants.

                  Table 10A.--Typical Cost of Air Pollution Control Retrofit for Existing MWC'S                 
----------------------------------------------------------------------------------------------------------------
                                                                             Costs ($1990 x 10 6)               
                     Plant size (Mg/day)                        MWC type  -------------------------- Model plant
                                                                             Capital       Annual       number  
----------------------------------------------------------------------------------------------------------------
45..........................................................       MOD/SA            2          0.5           10
136.........................................................       MOD/SA            3         10.5            9
181.........................................................       MOD/EA            3          0.4           11
181.........................................................        MB/WW            5          0.9            6
454.........................................................       MB/RWW           13          1.6           12
980.........................................................        MB/WW           25          3.2            5
2,041.......................................................        MB/WW           46          5.0            4
181.........................................................        MB/WW           a5          0.8           14
454.........................................................       MB/RWW          a13          1.6           17
544.........................................................          RDF           28          2.3            8
1,814.......................................................          RDF           64          4.8            7
1,814.......................................................          RDF          a33          4.4           15
544.........................................................          RDF          a17          2.0           16
218.........................................................       MB/REF            8          0.9            2
680.........................................................       MB/REF           39          2.3            1
816.........................................................       MB/REF           35          4.1            3
----------------------------------------------------------------------------------------------------------------
Note: See table 5-1 of the ``Economic Impacts Analysis for Proposed Emission Standards and Guidelines for       
  Municipal Waste Combustors'' (EPA-450/3-91-029) for more information.                                         
a These model plants are assumed to be relatively new units that originally incorporated good combustion in     
  their design and, therefore, do not need to retrofit good combustion to comply with the guidelines.           

[[Page 65411]]

    d. Social Benefits. Society will benefit from the proposed 
guidelines through the reduction of emissions of dioxins/furans, Cd, 
Pb, Hg, PM, HCl, SO2, and NOX. These pollutant categories are 
emitted by various types of sources, including MWC's. The level of 
pollutant emissions and health effects vary among types of sources, and 
total national emissions of these pollutants has been shown to have the 
health effects listed in table 11.

                   Table 11.--Health and Other Effects                  
------------------------------------------------------------------------
           Pollutant category                Health and other effects   
------------------------------------------------------------------------
Organics...............................    Mortality, morbidity.
                                           Carcinogenicity.     
Metals.................................    Retardation and brain
                                          damage.                       
                                           Hypertension.        
                                           Central nervous      
                                          system injury.                
                                           Renal dysfunction.   
Acid gases.............................    Materials damage.    
                                           Dental erosion.      
                                           Acid rain.           
                                           Mortality, morbidity.
                                           Respiratory tract    
                                          problems, permanent harm to   
                                          lung.                         
                                           Soiling and materials
                                          damage.                       
                                           Reduced agricultural 
                                          yield.                        
                                           Ozone formation.     
Particulate matter.....................    Mortality, morbidity.
                                           Eye and throat       
                                          irritation, bronchitis, lung  
                                          damage.                       
                                           Impaired visibility. 
                                           Soiling and materials
                                          damage.                       
------------------------------------------------------------------------

    Because of limitations on data on the concentration-response 
function and valuation of these functions, benefits have not been 
quantified for all pollutants. Benefits have been quantified only for 
emissions of SO2 and PM. Benefits have not been quantified for 
dioxins/furans, Cd, Pb, Hg, HCl or NOX emission control. Benefits 
to the public and environment will result from the control of these 
hazardous air pollutants (HAP's) and criteria pollutants. For the 
HAP's, dioxin/furan compounds have been associated with chloracne, 
reproductive/developmental effects, immune system toxicity, and cancer 
(probable human carcinogen). Particulate-associated metals including Pb 
and Cd are toxic and can cause effects such as mucous membrane 
irritation, gastrointestinal effects, nervous system disorders, skin 
irritation, and reproductive and developmental disorders. In regard to 
volatile metals, Hg in all forms may be characterized as quite toxic 
with each form exhibiting different health effects, including 
gastrointestinal and respiratory tract disturbances, central nervous 
system effects, and developmental effects. Additionally, HCl is 
corrosive and effects the eyes, skin, and mucus membranes, and 
dermatitis has been reported from long-term exposure.
    Table 12 provides the estimated social benefits associated with 
reductions in PM and SO2 emissions from MWC's and their 
distribution across public and private MWC's. The estimated social 
benefit of reduced PM and SO2 emissions is $106 million with $60.3 
million being attributed to reductions at publicly-owned MWC 
facilities. These benefits would be experienced annually by the 
residents of these municipalities. Proper allocation of these benefits 
would be based on the expected emission reductions at public and 
private MWC's. However, due to lack of data at the model plant level, 
these benefits are allocated across public and private MWC's in the 
same proportion as the estimated national compliance costs (i.e., 56.7 
percent for public and 43.3 percent for private).

 Table 12.--Social Benefit Estimates for SO2 and PM Emission Reductions 
                          by Ownership ($1990)                          
------------------------------------------------------------------------
                                           Social benefits ($10 \3\ per 
                                                    year) a b           
           Ownership category           --------------------------------
                                             PM        SO2       Total  
------------------------------------------------------------------------
Public.................................     30,779     29,475     60,254
Private................................     23,521     22,525     46,046
Total..................................     54,300     52,000    106,300
------------------------------------------------------------------------
a Benefit estimates are $1,200 per Mg of SO2 reduced and $17,700 per Mg 
  of PM reduced. (This estimate is derived valuing all mortalities at   
  $4.4 million per life saved. This approach does not consider the      
  length of the changes in longevity resulting from PM exposure). Social
  benefits attributable to public and private MWC's are proportionate to
  their share of the total annual costs.                                
b Does not include benefit credits for dioxins/furans, Cd, and Hg       
  control.                                                              

    Table 13 presents a comparison of the estimated social costs and 
benefits of the guidelines. Unfortunately, because benefit estimates 
are not computed for all pollutants, the social benefit provided in 
table 13 is a partial estimate. Because of this fact, the net benefits 
(i.e., benefits minus costs) shown in table 13 cannot be used to reach 
conclusions regarding the total net benefits of the rule for existing 
sources.

    Table 13.--Social Costs and Partial Social Benefits From Reducing   
        Emissions at MWC's by Ownership ($1990, 10 \3\ Per Year)        
------------------------------------------------------------------------
                                                      Total     Partial 
                Ownership category                    social     social 
                                                      costs     benefits
------------------------------------------------------------------------
Public............................................    251,107     60,254
Private...........................................    191,893     46,046
                                                   ---------------------
      Total.......................................    443,000    106,300
------------------------------------------------------------------------

3. Effects on the National Economy
    The Unfunded Mandates Act requires that the EPA estimate ``the 
effect'' of this rule

``on the national economy, such as the effect on productivity, 
economic growth, full employment, creation of productive jobs, and 
international competitiveness of the U.S. goods and services, if and 
to the extent that the EPA in its sole discretion determines that

[[Page 65412]]

accurate estimates are reasonably feasible and that such effect is 
relevant and material.''

As stated in the Unfunded Mandates Act, such macroeconomic effects tend 
to be measurable, in nationwide econometric models, only if the 
economic impact of the regulation reaches 0.25 to 0.5 percent of gross 
domestic product (in the range of $1.5 billion to $3 billion). A 
regulation with a smaller aggregate effect is highly unlikely to have 
any measurable impact in macroeconomic terms unless it is highly 
focused on a particular geographic region or economic sector. For this 
reason, no estimate of this rule's effect on the national economy has 
been conducted.
4. Consultation with Government Officials
    The Unfunded Mandates Act requires that the EPA describe the extent 
of the EPA's consultation with affected State, local, and tribal 
officials, summarize the officials' comments or concerns, and summarize 
the EPA's response to those comments or concerns. In addition, section 
203 of the Clean Air Act requires that the EPA develop a plan for 
informing and advising small governments that may be significantly or 
uniquely impacted by a proposal. Throughout the development of these 
rules (pre-proposal through pre-promulgation phases), the EPA consulted 
with representatives of affected State and local governments, including 
the U.S. Conference of Mayors, the National League of Cities, the 
National Association of Counties, the Solid Waste Association of North 
America, and the Municipal Waste Management Association, to inform them 
of the proposed rule and determine their concerns. (The EPA also 
consulted with representatives from other entities affected by the 
proposed rule, such as the Integrated Waste Services Association, the 
Sierra Club, and the Natural Resources Defense Council.)
    As part of EPA's consultation efforts in this rulemaking, the EPA 
mailed a copy of the regulatory summary (FACT SHEET) for the September 
20, 1994 proposed MWC standards and guidelines to every elected 
official in an area with either an operating MWC, an MWC under 
construction, or a planned MWC. (The EPA also mailed copies of the 
summary to all owners and operators of these MWC's.) This mailout 
exceeded 400 informational packages. Since approximately half of the 
MWC's are owned and/or operated by municipalities, with this effort, 
the EPA was able to ensure that every affected State and local 
government was made aware of the proposed rule and had the necessary 
information to provide comment.
    In addition, over a 3-month period, EPA staff consulted with State 
and local government representatives to discuss their comments 
regarding the final draft package. Letters were received during this 
time period from the U.S. Conference Mayors and the Integrated Waste 
Services Association (see docket A-90-45, items IV-D-44 and IV-D-85, 
respectively), which raised various concerns; however, in subsequent 
meetings, the EPA learned that State and local officials, as well as 
industry representatives, were mainly concerned with the following 
sections of the final draft emission guidelines: (1) The achievability 
for some MWC's of the final draft NOX emission limit included in 
the emission guidelines; (2) the fact that because the EPA had not 
subcategorized by combustor type for purposes of determining the 
NOX emission limit as it had when it determined the CO emission 
limit, some MWC's would be forced to install retrofit technology in 
order to meet the more stringent NOX limit, (3) the achievability 
for MWC's with large new ESP's of the final draft dioxin/furan emission 
limit included in the emission guidelines; and (4) the inconsistency 
between some of the definitions in the draft rules with the definitions 
given in 40 CFR part 60, subpart Ea, which establishes emission limits 
for MWC's that commence construction after December 20, 1989, but on or 
before September 20, 1994.
    As a result of these consultations, the EPA decided to modify the 
final regulatory package to address these concerns. The final emission 
guidelines promulgated today:
    (1) Subcategorize MWC's by combustor type for the purpose of 
establishing different NOx emission guidelines; and
    (2) Establish separate dioxin/furan emission guidelines for MWC's 
with ESP-based systems and MWC's with nonESP-based systems. In 
addition, in order to address the fourth concern identified by State 
and local governments, the EPA is publishing today under a separate 
Federal Register notice, a direct final rule that modifies the 
applicability and definitions sections of 40 CFR part 60, subpart Ea to 
improve clarity and make them consistent with those provided in the 
standards and emission guidelines promulgated in this notice.
    Documentation of the EPA's consideration of comments on the 
proposed standards and guidelines is provided in the BID's for the 
proposed and final standards and guidelines. Refer to the SUPPLEMENTARY 
INFORMATION and ADDRESSES sections of this preamble for information on 
how to acquire copies of these documents.
    As discussed in section IV.F, the number of affected small entities 
is not expected to be substantial. The full analysis of potential 
regulatory impacts on households, small governments, and small 
businesses is included in the economic impact analysis in the docket 
and listed under SUPPLEMENTARY INFORMATION. Because the number of 
affected small entities is expected to be insubstantial (i.e., the EPA 
considers that the regulation is likely to affect less than 20 percent 
of small entities with MWC's--see section IV.F for a more detailed 
explanation), no plan to inform and advise small governments is 
required under section 203 of the Unfunded Mandates Act. However, as 
described above, the EPA has communicated and consulted with small 
governments and businesses that will be affected by the standards and 
guidelines, keeping them informed about the content of this 
promulgation. Refer to section III.C. for a description of these 
communications.
E. Executive Order 12875
    To reduce the burden of Federal regulations on States and small 
governments, the President issued Executive Order 12875 on October 26, 
1993, entitled ``Enhancing the Intergovernmental Partnership.'' Under 
Executive Order 12875, the EPA is required to consult with 
representatives of affected State, local, and tribal governments, and 
keep these affected parties informed about the content and effect of 
the promulgated standards and emission guidelines. Section III.A of 
this notice provides a brief summary of the need for the final 
standards and guidelines. Sections IV.C and V.C provide brief summaries 
of the cost of the final guidelines and standards. Section III.C 
provides a brief account of the actions that the EPA has taken to 
communicate and consult with the affected parties. The discussion 
provided below provides a brief summary of the content of the final 
standards and guidelines. For more information on the content of the 
final standards and guidelines, refer to sections IV.A and V.A of this 
notice.
    The promulgated standards and guidelines establish emission 
limitations for new and existing MWC units located at MWC plants with 
plant capacities to combust greater than 35 Mg/day of MSW. The 
standards and guidelines do not specify which type of air pollution 
control equipment must be 

[[Page 65413]]
used at MWC's to meet the promulgated emission limitations. The EPA 
expects, however, that, as a result of the promulgated standards and 
guidelines, most new and existing MWC's at large MWC plants (plants 
with greater than 225 Mg/day capacity) will use SD/FF systems with 
activated carbon injection (new plants) or retrofit SD/FF or SD/ESP 
systems with activated carbon injection (existing plants) for dioxins/
furans, metals, and acid gas control, and will use SNCR for NOX 
control. New MWC's at small MWC plants (plants with 35 to 225 Mg/day 
capacity) are expected to install SD/FF systems with activated carbon 
injection, and existing MWC's at small plants are expected to install 
DSI/ESP systems with activated carbon injection. Selective noncatalytic 
reduction technology would not be necessary for either new or existing 
MWC's at small MWC plants.

F. Regulatory Flexibility Act

    Section 605 of the RFA (5 U.S.C. 601 et seq.) requires Federal 
agencies to give special consideration to the impacts of regulations on 
small entities, which are small businesses, small organizations, and 
small governments. The major purpose of the RFA is to keep paperwork 
and regulatory requirements from getting out of proportion to the scale 
of the entities being regulated without compromising the objectives of, 
in this case, the Clean Air Act.
    If a regulation is likely to have a significant economic impact on 
a substantial number of small entities, the EPA may give special 
consideration to those small entities when analyzing regulatory 
alternatives and drafting the regulation. In the case at hand, the EPA 
considers that a regulation that is likely to affect 20 percent or more 
of small entities with MWC's is a regulation that will affect a 
substantial number of small entities.
    Definitions of small entities are flexible. For analysis of the 
regulations being proposed today, the EPA considers a small business in 
this industry to be one with gross annual revenue less than $6 million, 
and a small government to be one that serves a population less than 
50,000. (A typical city of 50,000 generates about 90 Mg/day of MSW.) 
Most small governments dispose of their MSW by landfilling and, 
therefore, will not be affected by regulation of MWC emissions. In 
regard to small organizations such as independent not-for-profit 
enterprises, the EPA finds that they have no more than a very minor 
involvement with MWC's, and for that reason the EPA has not found it 
necessary to study potential direct impacts on small organizations.
    The final regulations do not apply to MWC plants with capacity less 
than 35 Mg/day. The EPA estimates that few if any small-entity MWC's 
would be affected by today's promulgated standards and guidelines.
    Thus, the number of affected small entities is not expected to be 
substantial, and a regulatory flexibility analysis is not required. 
Nevertheless, the EPA has conducted an extensive analysis of potential 
regulatory impacts on households, small governments, and small 
businesses. The analysis is summarized in the preambles to the proposed 
standards (59 FR 48198) and guidelines (59 FR 48228.) The full analysis 
is included in the economic impact assessment in the docket and is 
listed at the beginning of today's notice under SUPPLEMENTARY 
INFORMATION.
    On December 20, 1989, the EPA proposed standards and guidelines for 
MWC's that applied to all sizes of MWC's. The 1989 proposal had no 
lower size cutoff. Small businesses, small governments, and groups 
representing small-entity interests commented extensively on the need 
to lighten the potential regulatory burden on small entities. Most 
commenters suggested a small size cutoff considerably smaller than the 
one now being proposed. The most frequently suggested levels were 5 to 
11 Mg/day, 18 Mg/day, 23 Mg/day, and 45 Mg/day. The EPA has used these 
suggestions and the information submitted by these commenters, as well 
as information from other sources, to fulfill the intent of the RFA. 
The EPA has incorporated into the standards and guidelines being 
promulgated today several features that will mitigate and, in most 
cases eliminate, any potential, adverse economic impacts on small 
entities. These features are as follows:
    (1) The standards and guidelines will apply only to MWC's with a 
plant capacity of greater than 35 Mg/day. This cutoff eliminates from 
the purview of the regulation and guidelines the overwhelming majority 
of projected new and existing very small MWC's;
    (2) The standards and guidelines are ``tiered'' so that the 
stringency (and therefore potential economic burden) of the emission 
standards and guidelines increases as the size of the MWC plant 
increases. Plants with capacities less than or equal to 35 Mg/day are 
not covered under the final standards and guidelines. Plants with 
capacities of 35 to 225 Mg/day are not required to control NOx. 
Only plants with capacities larger than 225 Mg/day--plants not often 
associated with small entities--are subject to a full complement of 
rigorous standards;
    (3) As opposed to design, equipment, work practice, or operational 
standards, the standards for new sources and the guidelines for 
existing sources consist predominantly of emission limits. Emission 
limits give MWC owners and operators of new and existing MWC's the 
freedom to select the most economical means of compliance.
    (4) The guidelines are not the usual type of regulation governed by 
the RFA. The guidelines will not apply directly to any MWC's, but will 
be used as a guide by individual State air pollution control agencies 
in developing site-specific regulations for MWC's. States are allowed 
some flexibility in implementing the guidelines.
    Pursuant to the provisions of 5 U.S.C. 605(b), the EPA certifies 
that the standards and guidelines will not have a significant economic 
impact on a substantial number of small entities because the number of 
small entities affected is not substantial.

G. Clean Air Act Procedural Requirements

    The following procedural requirements of the Clean Air Act are 
addressed: Administrative listing, periodic review, external 
participation, and economic impact assessment.
1. Administrator Listing--Sections 111 and 129 of the Clean Air Act
    As prescribed by section 111 of the Clean Air Act, establishment of 
standards of performance and emission guidelines for MWC's is based on 
the Administrator's determination (52 FR 25399, July 7, 1987) that 
these sources contribute significantly to air pollution that may 
reasonably be anticipated to endanger public health or welfare. 
Additionally, section 129 of the 1990 Amendments to the Clean Air Act 
directs the Administrator to promulgate revised standards for new MWC's 
and guidelines for existing MWC's.
2. Periodic Review--Sections 111 and 129 of the Clean Air Act
    Sections 111 and 129 of the Clean Air Act require that the 
standards and guidelines be reviewed not later than 5 years following 
the initial promulgation. At that time and at 5-year intervals 
thereafter, the Administrator shall review the standards and guidelines 
and revise them if necessary. This review will include an assessment of 
such factors as the need for integration with other programs, the 
existence of alternative methods, enforceability, improvements in 
emission control technology, and reporting requirements.

[[Page 65414]]

3. External Participation
    In accordance with section 117 of the Clean Air Act, publication of 
this promulgation was preceded by consultation with appropriate 
advisory committees, independent experts, and Federal departments and 
agencies.
4. Economic Impact Assessment
    Section 317A of the Clean Air Act requires the EPA to prepare an 
economic impact assessment for any standards or guidelines promulgated 
under section 111(b) of the Clean Air Act. An economic impact 
assessment was prepared for the promulgated standards and guidelines. 
In the manner described in the sections of this preamble regarding the 
impacts of and rationale for the promulgated standards and guidelines, 
the EPA considered all aspects of the economic impact assessment in 
promulgating the standards and guidelines. The economic impact 
assessment is included in the list of key technical documents at the 
beginning of today's notice under SUPPLEMENTARY INFORMATION.

List of Subjects in 40 CFR Part 60

    Environmental Protection, Air pollution control, Intergovernmental 
relations, Incorporation by reference, Reporting and recordkeeping 
requirements.

    Dated: October 31, 1995.
Carol M. Browner,
Administrator.

    Part 60, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 60--[AMENDED]

    1. The authority citation for part 60 continues to read as follows:

    Authority: 42 U.S.C. 7401, 7411, 7414, 7416, 7429, and 7601.
    2. Section 60.17 of subpart A of part 60 is amended by revising 
paragraphs (h)(1), (h)(2), and (h)(3) to read as follows:

Sec. 60.17  Incorporation by reference.

* * * * *
    (h) * * *
    (1) ASME QRO-1-1994, Standard for the Qualification and 
Certification of Resource Recovery Facility Operators, IBR approved for 
Secs. 60.56a, 60.54b(a) and 60.54b(b).

    (2) ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test 
Code for Steam Generating Units (with 1968 and 1969 Addenda), IBR 
approved for Secs. 60.46b, 60.58a(h)(6)(ii), and 60.58b(i)(6)(ii).
    (3) ASME Interim Supplement 19.5 on Instruments and Apparatus: 
Application, Part II of Fluid Meters, 6th Edition (1971), IBR approved 
for Secs. 60.58a(h)(6)(ii) and 60.58b(i)(6)(ii).
* * * * *
    3. Section 60.23 of subpart B of part 60 is amended by revising 
paragraph (a)(1) to read as follows:

Sec. 60.23  Adoption and submittal of State plans; public hearings.

    (a) * * *
    (1) Unless otherwise specified in the applicable subpart, within 9 
months after notice of the availability of a final guideline document 
is published under Sec. 60.22(a), each State shall adopt and submit to 
the Administrator, in accordance with Sec. 60.4 of subpart A of this 
part, a plan for the control of the designated pollutant to which the 
guideline document applies.
* * * * *
    4. Section 60.24 of subpart B of part 60 is amended by revising 
paragraph (f) introductory text to read as follows:

Sec. 60.24  Emission standards and compliance schedules.

* * * * *
    (f) Unless otherwise specified in the applicable subpart on a case-
by-case basis for particular designated facilities or classes of 
facilities, States may provide for the application of less stringent 
emissions standards or longer compliance schedules than those otherwise 
required by paragraph (c) of this section, provided that the State 
demonstrates with respect to each such facility (or class of 
facilities):
* * * * *
    5. Subpart C of part 60 is amended by revising Sec. 60.30 to read 
as follows:

Sec. 60.30  Scope.

    The following subparts contain emission guidelines and compliance 
times for the control of certain designated pollutants in accordance 
with section 111(d) and section 129 of the Clean Air Act and subpart B 
of this part.
    (a) Subpart Ca--[Removed and Reserved]
    (b) Subpart Cb--Municipal Waste Combustors
    (c) Subpart Cc--[Reserved]
    (d) Subpart Cd--Sulfuric Acid Production Plants

Subpart Ca--[Removed and Reserved]

    5a. Part 60 is amended by removing and reserving subpart Ca.

Subpart Cb--[Redesignated as Subpart Cd]

Subpart Cc--[Reserved]

    6. Part 60 is amended by redesignating subpart Cb as Cd, reserving 
subpart Cc, and revising the new subpart Cd to read as follows:
Subpart Cd--Emissions Guidelines and Compliance Times for Sulfuric Acid 
Production Units
Sec.
60.30d  Designated facilities.
60.31d  Emission guidelines.
60.32d  Compliance times.

Subpart Cd--Emission Guidelines and Compliance Times for Sulfuric 
Acid Production Units

Sec. 60.30d  Designated facilities.

    Sulfuric acid production units. The designated facility to which 
Secs. 60.31d and 60.32d apply is each existing ``sulfuric acid 
production unit'' as defined in Sec. 60.81(a) of subpart H of this 
part.

Sec. 60.31d  Emissions guidelines.

    Sulfuric acid production units. The emission guideline for 
designated facilities is 0.25 grams sulfuric acid mist (as measured by 
EPA Reference Method 8 of appendix A of this part) per kilogram (0.5 
pounds per ton) of sulfuric acid produced, the production being 
expressed as 100 percent sulfuric acid.

Sec. 60.32d  Compliance times.

    Sulfuric acid production units. Planning, awarding of contracts, 
and installation of equipment capable of attaining the level of the 
emission guideline established under Sec. 60.31d can be accomplished 
within 17 months after the effective date of a State emission standard 
for sulfuric acid mist.
    7. Part 60 is further amended by adding a new subpart Cb to read as 
follows:
Subpart Cb--Emissions Guidelines and Compliance Times for Municipal 
Waste Combustors That Are Constructed on or Before December 19, 1995
Sec.
60.30b  Scope.
60.31b  Definitions.
60.32b  Designated facilities.
60.33b  Emission guidelines for municipal waste combustor metals, 
acid gases, organics, and nitrogen oxides.
60.34b  Emission guidelines for municipal waste combustor operating 
practices.
60.35b  Emission guidelines for municipal waste combustor operator 
training and certification.
60.36b  Emission guidelines for municipal waste combustor fugitive 
ash emissions.
60.37b  Emission guidelines for air curtain incinerators. 

[[Page 65415]]

60.38b  Compliance and performance testing.
60.39b  Reporting and recordkeeping guidelines, and compliance 
schedules.

Subpart Cb--Emissions Guidelines and Compliance Schedules for 
Municipal Waste Combustors

Sec. 60.30b  Scope.

    This subpart contains emission guidelines and compliance schedules 
for the control of certain designated pollutants from certain municipal 
waste combustors in accordance with section 111(d) and section 129 of 
the Clean Air Act and subpart B of this part. The provisions in these 
emission guidelines supersede the provisions of Sec. 60.24(f) of 
subpart B of this part.

Sec. 60.31b  Definitions.

    Terms used but not defined in this subpart have the meaning given 
them in the Clean Air Act and subparts A, B, and Eb of this part.
    Municipal waste combustor plant means one or more municipal waste 
combustor units at the same location for which construction was 
commenced on or before September 20, 1994.
    Municipal waste combustor plant capacity means the aggregate 
municipal waste combustor unit capacity of all municipal waste 
combustor units at a municipal waste combustor plant for which 
construction was commenced on or before September 20, 1994.

Sec. 60.32b  Designated facilities.

    (a) The designated facility to which these guidelines apply is each 
municipal waste combustor unit located within a municipal waste 
combustor plant with an aggregate municipal waste combustor plant 
capacity greater than 35 megagrams per day of municipal solid waste for 
which construction was commenced on or before September 20, 1994.
    (b) Any waste combustion unit at a medical, industrial, or other 
type of waste combustor plant that is capable of combusting more than 
35 megagrams per day of municipal solid waste and is subject to a 
federally enforceable permit limiting the plantwide maximum amount of 
municipal solid waste that may be combusted to less than or equal to 10 
megagrams per day is not subject to this subpart if the owner or 
operator:
    (1) Notifies the Administrator of an exemption claim,
    (2) Provides a copy of the federally enforceable permit that limits 
the firing of municipal solid waste to less than 10 megagrams per day, 
and
    (3) Keeps records of the amount of municipal solid waste fired on a 
daily basis.
    (c) Physical or operational changes made to an existing municipal 
waste combustor unit primarily for the purpose of complying with 
emission guidelines under this subpart are not considered in 
determining whether the unit is a modified or reconstructed facility 
under subpart Ea or subpart Eb of this part.
    (d) A qualifying small power production facility, as defined in 
section 3(17)(C) of the Federal Power Act (16 U.S.C. 796(17)(C)), that 
burns homogeneous waste (such as automotive tires or used oil, but not 
including refuse-derived fuel) for the production of electric energy is 
not subject to this subpart if the owner or operator of the facility 
notifies the Administrator of this exemption and provides data 
documenting that the facility qualifies for this exemption.
    (e) A qualifying cogeneration facility, as defined in section 
3(18)(B) of the Federal Power Act (16 U.S.C. 796(18)(B)), that burns 
homogeneous waste (such as automotive tires or used oil, but not 
including refuse-derived fuel) for the production of electric energy 
and steam or forms of useful energy (such as heat) that are used for 
industrial, commercial, heating, or cooling purposes, is not subject to 
this subpart if the owner or operator of the facility notifies the 
Administrator of this exemption and provides data documenting that the 
facility qualifies for this exemption.
    (f) Any unit combusting a single-item waste stream of tires is not 
subject to this subpart if the owner or operator of the unit:
    (1) Notifies the Administrator of an exemption claim, and
    (2) Provides data documenting that the unit qualifies for this 
exemption.
    (g) Any unit required to have a permit under section 3005 of the 
Solid Waste Disposal Act is not subject to this subpart.
    (h) Any materials recovery facility (including primary or secondary 
smelters) that combusts waste for the primary purpose of recovering 
metals is not subject to this subpart.
    (i) Any cofired combustor, as defined under Sec. 60.51b of subpart 
Eb of this part, that meets the capacity specifications in paragraph 
(a) of this section is not subject to this subpart if the owner or 
operator of the cofired combustor:
    (1) Notifies the Administrator of an exemption claim,
    (2) Provides a copy of the federally enforceable permit (specified 
in the definition of cofired combustor in this section), and
    (3) Keeps a record on a calendar quarter basis of the weight of 
municipal solid waste combusted at the cofired combustor and the weight 
of all other fuels combusted at the cofired combustor.
    (j) Air curtain incinerators, as defined under Sec. 60.51b of 
subpart Eb of this part, that meet the capacity specifications in 
paragraph (a) of this section, and that combust a fuel stream composed 
of 100 percent yard waste are exempt from all provisions of this 
subpart except the opacity standard under Sec. 60.37b, the testing 
procedures under Sec. 60.38b, and the reporting and recordkeeping 
provisions under Sec. 60.39b.
    (k) Air curtain incinerators that meet the capacity specifications 
in paragraph (a) of this section and that combust municipal solid waste 
other than yard waste are subject to all provisions of this subpart.
    (l) Pyrolysis/combustion units that are an integrated part of a 
plastics/rubber recycling unit (as defined in Sec. 60.51b) are not 
subject to this subpart if the owner or operator of the plastics/rubber 
recycling unit keeps records of the weight of plastics, rubber, and/or 
rubber tires processed on a calendar quarter basis; the weight of 
chemical plant feedstocks and petroleum refinery feedstocks produced 
and marketed on a calendar quarter basis; and the name and address of 
the purchaser of the feedstocks. The combustion of gasoline, diesel 
fuel, jet fuel, fuel oils, residual oil, refinery gas, petroleum coke, 
liquified petroleum gas, propane, or butane produced by chemical plants 
or petroleum refineries that use feedstocks produced by plastics/rubber 
recycling units are not subject to this subpart.

Sec. 60.33b  Emission guidelines for municipal waste combustor metals, 
acid gases, organics, and nitrogen oxides.

    (a) The emission limits for municipal waste combustor metals are 
specified in paragraphs (a)(1) through (a)(3) of this section.
    (1) For approval, a State plan shall include emission limits for 
particulate matter and opacity at least as protective as the emission 
limits for particulate matter and opacity specified in paragraphs 
(a)(1)(i) through (a)(1)(iii) of this section.
    (i) The emission limit for particulate matter contained in the 
gases discharged to the atmosphere from a designated facility located 
within a large municipal waste combustor plant is 27 milligrams per dry 
standard cubic meter, corrected to 7 percent oxygen.
    (ii) The emission limit for particulate matter contained in the 
gases discharged to the atmosphere from a designated facility located 
within a small municipal waste combustor plant is 70 

[[Page 65416]]
milligrams per dry standard cubic meter, corrected to 7 percent oxygen.
    (iii) The emission limit for opacity exhibited by the gases 
discharged to the atmosphere from a designated facility located within 
a small or large municipal waste combustor plant is 10 percent (6-
minute average).
    (2) For approval, a State plan shall include emission limits for 
cadmium and lead at least as protective as the emission limits for 
cadmium and lead specified in paragraphs (a)(2)(i) through (a)(2)(iv) 
of this section.
    (i) The emission limit for cadmium contained in the gases 
discharged to the atmosphere from a designated facility located within 
a large municipal waste combustor plant is 0.040 milligrams per dry 
standard cubic meter, corrected to 7 percent oxygen.
    (ii) The emission limit for cadmium contained in the gases 
discharged to the atmosphere from a designated facility located within 
a small municipal waste combustor plant is 0.10 milligrams per dry 
standard cubic meter, corrected to 7 percent oxygen.
    (iii) The emission limit for lead contained in the gases discharged 
to the atmosphere from a designated facility located within a large 
municipal waste combustor plant is 0.49 milligrams per dry standard 
cubic meter, corrected to 7 percent oxygen.
    (iv) The emission limit for lead contained in the gases discharged 
to the atmosphere from a designated facility located within a small 
municipal waste combustor plant is 1.6 milligrams per dry standard 
cubic meter, corrected to 7 percent oxygen.
    (3) For approval, a State plan shall include emission limits for 
mercury at least as protective as the emission limits specified in this 
paragraph. The emission limit for mercury contained in the gases 
discharged to the atmosphere from a designated facility located within 
a small or large municipal waste combustor plant is 0.080 milligrams 
per dry standard cubic meter or 15 percent of the potential mercury 
emission concentration (an 85-percent reduction by weight), corrected 
to 7 percent oxygen, whichever is less stringent.
    (b) The emission limits for municipal waste combustor acid gases, 
expressed as sulfur dioxide and hydrogen chloride, are specified in 
paragraphs (b)(1) and (b)(2) of this section.
    (1) For approval, a State plan shall include emission limits for 
sulfur dioxide at least as protective as the emission limits for sulfur 
dioxide specified in paragraphs (b)(1)(i) and (b)(1)(ii) of this 
section.
    (i) The emission limit for sulfur dioxide contained in the gases 
discharged to the atmosphere from a designated facility located within 
a large municipal waste combustor plant is 31 parts per million by 
volume or 25 percent of the potential sulfur dioxide emission 
concentration (75-percent reduction by weight or volume), corrected to 
7 percent oxygen (dry basis), whichever is less stringent. Compliance 
with this emission limit is based on a 24-hour daily geometric mean.
    (ii) The emission limit for sulfur dioxide contained in the gases 
discharged to the atmosphere from a designated facility located within 
a small municipal waste combustor plant is 80 parts per million by 
volume or 50 percent of the potential sulfur dioxide emission 
concentration (50-percent reduction by weight or volume), corrected to 
7 percent oxygen (dry basis), whichever is less stringent. Compliance 
with this emission limit is based on a 24-hour geometric mean.
    (2) For approval, a State plan shall include emission limits for 
hydrogen chloride at least as protective as the emission limits for 
hydrogen chloride specified in paragraphs (b)(2)(i) and (b)(2)(ii) of 
this section.
    (i) The emission limit for hydrogen chloride contained in the gases 
discharged to the atmosphere from a designated facility located within 
a large municipal waste combustor plant is 31 parts per million by 
volume or 5 percent of the potential hydrogen chloride emission 
concentration (95-percent reduction by weight or volume), corrected to 
7 percent oxygen (dry basis), whichever is less stringent.
    (ii) The emission limit for hydrogen chloride contained in the 
gases discharged to the atmosphere from an affected facility located 
within a small municipal waste combustor plant is 250 parts per million 
by volume or 50 percent of the potential hydrogen chloride emission 
concentration (50-percent reduction by weight or volume), corrected to 
7 percent oxygen (dry basis), whichever is less stringent.
    (c) The emission limits for municipal waste combustor organics, 
expressed as total mass dioxins/furans, are specified in paragraphs 
(c)(1) and (c)(2) of this section.
    (1) For approval, a State plan shall include an emission limit for 
dioxins/furans contained in the gases discharged to the atmosphere from 
a designated facility located within a large municipal waste combustor 
plant at least as protective as the emission limit for dioxins/furans 
specified in either paragraph (c)(1)(i) or (c)(1)(ii) of this section, 
as applicable.
    (i) The emission limit for designated facilities that employ an 
electrostatic precipitator-based emission control system is 60 
nanograms per dry standard cubic meter (total mass), corrected to 7 
percent oxygen.
    (ii) The emission limit for designated facilities that do not 
employ an electrostatic precipitator-based emission control system is 
30 nanograms per dry standard cubic meter (total mass), corrected to 7 
percent oxygen.
    (2) For approval, a State plan shall include an emission limit for 
dioxins/furans contained in the gases discharged to the atmosphere from 
a designated facility located within a small municipal waste combustor 
plant at least as protective as the emission limit for dioxins/furans 
specified in this paragraph. The emission limit for dioxins/furans for 
designated facilities located within a small municipal waste combustor 
plant is 125 nanograms per dry standard cubic meter (total mass), 
corrected to 7 percent oxygen.
    (d) For approval, a State plan shall include emission limits for 
nitrogen oxides at least as protective as the emission limits listed in 
table 1 of this subpart for designated facilities located within large 
municipal waste combustor plants. Table 1 provides emission limits for 
the nitrogen oxides concentration level for each type of designated 
facility.

 Table 1.--Nitrogen Oxides Guidelines for Designated Facilities at Large
                    Municipal Waste Combustor Plants                    
------------------------------------------------------------------------
                                                              Nitrogen  
                                                               oxides   
                                                              emission  
           Municipal waste combustor technology             limit (parts
                                                             per million
                                                            by volume) a
------------------------------------------------------------------------
Mass burn waterwall.......................................          200 
Mass burn rotary waterwall................................          250 
Refuse-derived fuel combustor.............................          250 
Fluidized bed combustor...................................          240 
Mass burn refractory combustors...........................     no limit 
Otherb....................................................         200  
------------------------------------------------------------------------
a Corrected to 7 percent oxygen, dry basis.                             
b Excludes mass burn refractory municipal waste combustors.             

    (1) A State plan may allow nitrogen oxides emissions averaging as 
specified in paragraphs (d)(1)(i) through (d)(1)(v) of this section.
    (i) An owner or operator of a large municipal waste combustor plant 
may elect to implement a nitrogen oxides emissions averaging plan for 
the designated facilities that are located at that plant and that are 
subject to subpart Cb, except as specified in paragraphs 

[[Page 65417]]
(d)(1)(i)(A) and (d)(1)(i)(B) of this section.
    (A) Municipal waste combustor units subject to subpart Ea or Eb 
cannot be included in the emissions averaging plan.
    (B) Mass burn refractory municipal waste combustor units cannot be 
included in the emissions averaging plan.
    (ii) The designated facilities included in the nitrogen oxides 
emissions averaging plan must be identified in the initial compliance 
report specified in Sec. 60.59b(f) or in the annual report specified in 
Sec. 60.59b(g), as applicable, prior to implementing the averaging 
plan. The designated facilities being included in the averaging plan 
may be redesignated each calendar year. Partial year redesignation is 
allowable with State approval.
    (iii) To implement the emissions averaging plan, the average daily 
(24-hour) nitrogen oxides emission concentration level for gases 
discharged from the designated facilities being included in the 
emissions averaging plan must be no greater than the levels specified 
in table 2 of this subpart. Table 2 provides emission limits for the 
nitrogen oxides concentration level for each type of designated 
facility.

   Table 2.--Nitrogen Oxides Limits For Existing Designated Facilities  
    Included in an Emissions Averaging Plan at Large Municipal Waste    
                            Combustor Plants                            
------------------------------------------------------------------------
                                                              Nitrogen  
                                                               oxides   
                                                              emission  
           Municipal waste combustor technology             limit (parts
                                                             per million
                                                             by volume)a
------------------------------------------------------------------------
Mass burn waterwall.......................................          180 
Mass burn rotary waterwall................................          220 
Refuse-derived fuel combustor.............................          230 
Fluidized bed combustor...................................          220 
Otherb....................................................          180 
------------------------------------------------------------------------
a Corrected to 7 percent oxygen, dry basis.                             
b Excludes mass burn refractory municipal waste combustors. Mass burn   
  refractory municipal waste combustors may not be included in an       
  emissions averaging plan.                                             

    (iv) Under the emissions averaging plan, the average daily nitrogen 
oxides emissions specified in paragraph (d)(1)(iii) of this section 
shall be calculated using equation (1). Designated facilities that are 
offline shall not be included in calculating the average daily nitrogen 
oxides emission level.
[GRAPHIC][TIFF OMITTED]TR19DE95.000

where:

NOX 24-hr=24-hr daily average nitrogen oxides emission 
concentration level for the emissions averaging plan (parts per million 
by volume corrected to 7 percent oxygen).
NOX i-hr=24-hr daily average nitrogen oxides emission 
concentration level for designated facility i (parts per million by 
volume, corrected to 7 percent oxygen), calculated according to the 
procedures in Sec. 60.58b(h) of this subpart.
Si=maximum demonstrated municipal waste combustor unit load for 
designated facility i (pounds per hour steam or feedwater flow as 
determined in the most recent dioxin/furan performance test).
h=total number of designated facilities being included in the daily 
emissions average.

    (v) For any day in which any designated facility included in the 
emissions averaging plan is offline, the owner or operator of the 
municipal waste combustor plant must demonstrate compliance according 
to either paragraph (d)(1)(v)(A) of this section or both paragraphs 
(d)(1)(v)(B) and (d)(1)(v)(C) of this section.
    (A) Compliance with the applicable limits specified in table 2 of 
this subpart shall be demonstrated using the averaging procedure 
specified in paragraph (d)(1)(iv) of this section for the designated 
facilities that are online.
    (B) For each of the designated facilities included in the emissions 
averaging plan, the nitrogen oxides emissions on a daily average basis 
shall be calculated and shall be equal to or less than the maximum 
daily nitrogen oxides emission level achieved by that designated 
facility on any of the days during which the emissions averaging plan 
was achieved with all designated facilities online during the most 
recent calendar quarter. The requirements of this paragraph do not 
apply during the first quarter of operation under the emissions 
averaging plan.
    (C) The average nitrogen oxides emissions (kilograms per day) 
calculated according to paragraph (d)(1)(v)(C)(2) of this section shall 
not exceed the average nitrogen oxides emissions (kilograms per day) 
calculated according to paragraph (d)(1)(v)(C)(1) of this section.
    (1) For all days during which the emissions averaging plan was 
implemented and achieved and during which all designated facilities 
were online, the average nitrogen oxides emissions shall be calculated. 
The average nitrogen oxides emissions (kilograms per day) shall be 
calculated on a calendar year basis according to paragraphs 
(d)(1)(v)(C)(1)(i) through (d)(1)(v)(C)(1)(iii) of this section.
    (i) For each designated facility included in the emissions 
averaging plan, the daily amount of nitrogen oxides emitted (kilograms 
per day) shall be calculated based on the hourly nitrogen oxides data 
required under Sec. 60.38b(a) and specified under Sec. 60.58b(h)(5) of 
subpart Eb of this part, the flue gas flow rate determined using table 
19-1 of EPA Reference Method 19 or a State-approved method, and the 
hourly average steam or feedwater flow rate.
    (ii) The daily total nitrogen oxides emissions shall be calculated 
as the sum of the daily nitrogen oxides emissions from each designated 
facility calculated under paragraph (d)(1)(v)(C)(1)(i) of this section.
    (iii) The average nitrogen oxides emissions (kilograms per day) on 
a calendar year basis shall be calculated as the sum of all daily total 
nitrogen oxides emissions calculated under paragraph 
(d)(1)(v)(C)(1)(ii) of this section divided by the number of calendar 
days for which a daily total was calculated.
    (2) For all days during which one or more of the designated 
facilities under the emissions averaging plan was offline, the average 
nitrogen oxides emissions shall be calculated. The average nitrogen 
oxides emissions (kilograms per day) shall be calculated on a calendar 
year basis according to paragraphs (d)(1)(v)(C)(2)(i) through 
(d)(1)(v)(C)(2)(iii) of this section.
    (i) For each designated facility included in the emissions 
averaging plan, the daily amount of nitrogen oxides emitted (kilograms 
per day) shall be calculated based on the hourly nitrogen oxides data 
required under Sec. 60.38b(a) and specified under Sec. 60.58b(h)(5) of 
subpart Eb of this part, the flue gas flow rate determined using table 
19-1 of EPA Reference Method 19 or a State-approved method, and the 
hourly average steam or feedwater flow rate.
    (ii) The daily total nitrogen oxides emissions shall be calculated 
as the sum of the daily nitrogen oxides emissions from each designated 
facility calculated under paragraph (d)(1)(v)(C)(2)(i) of this section.
    (iii) The average nitrogen oxides emissions (kilograms per day) on 
a calendar year basis shall be calculated 

[[Page 65418]]
as the sum of all daily total nitrogen oxides emissions calculated 
under paragraph (d)(1)(v)(C)(2)(ii) of this section divided by the 
number of calendar days for which a daily total was calculated.
    (2) A State plan may establish a program to allow owners or 
operators of municipal waste combustor plants to engage in trading of 
nitrogen oxides emission credits. A trading program must be approved by 
the Administrator before implementation.

Sec. 60.34b  Emission guidelines for municipal waste combustor 
operating practices.

    (a) For approval, a State plan shall include emission limits for 
carbon monoxide at least as protective as the emission limits for 
carbon monoxide listed in table 3 of this subpart. Table 3 provides 
emission limits for the carbon monoxide concentration level for each 
type of designated facility located within a small or large municipal 
waste combustor plant.

        Table 3.--Municipal Waste Combustor Operating Guidelines        
------------------------------------------------------------------------
                                                   Carbon               
                                                  monoxide              
                                                 emissions              
     Municipal waste combustor technology          level      Averaging 
                                                 (parts per   time (hrs)
                                                 million by             
                                                  volume)a              
------------------------------------------------------------------------
Mass burn waterwall...........................          100            4
Mass burn refractory..........................          100            4
Mass burn rotary refractory...................          100           24
Mass burn rotary waterwall....................          250           24
Modular starved air...........................           50            4
Modular excess air............................           50            4
Refuse-derived fuel stoker....................          200           24
Buddling fluidized bed combustor..............          100            4
Circulating fluidized bed combustor...........          100            4
Pulverized coal/refuse-derived fuel mixed fuel-                         
 fired combustor..............................          150            4
Spreader stoker coal/refuse-derived fuel mixed                          
 fuel-fired combustor.........................          200           24
------------------------------------------------------------------------
a Measured at the combustor outlet in conjunction with a measurement of 
  oxygen concentration, corrected to 7 percent oxygen, dry basis.       
  Calculated as an arithmetic average.                                  

    (b) For approval, a State plan shall include requirements for 
municipal waste combustor operating practices at least as protective as 
those requirements listed in Sec. 60.53b(b) and (c) of subpart Eb of 
this part.

Sec. 60.35b  Emission guidelines for municipal waste combustor operator 
training and certification.

    For approval, a State plan shall include requirements for 
designated facilities located within small or large municipal waste 
combustor plants for municipal waste combustor operator training and 
certification at least as protective as those requirements listed in 
Sec. 60.54b of subpart Eb of this part. The State plan shall require 
compliance with these requirements according to the schedule specified 
in Sec. 60.39b(c)(4).

Sec. 60.36b  Emission guidelines for municipal waste combustor fugitive 
ash emissions.

    For approval, a State plan shall include requirements for municipal 
waste combustor fugitive ash emissions at least as protective as those 
requirements listed in Sec. 60.55b of subpart Eb of this part.

Sec. 60.37b  Emission guidelines for air curtain incinerators.

    For approval, a State plan shall include emission limits for 
opacity for air curtain incinerators at least as protective as those 
listed in Sec. 60.56b of subpart Eb of this part.

Sec. 60.38b  Compliance and performance testing.

    (a) For approval, a State plan shall include the performance 
testing methods listed in Sec. 60.58b of subpart Eb of this part, as 
applicable, except as provided for under Sec. 60.24(b)(2) of subpart B 
of this part and paragraphs (b) and (c) of this section.
    (b) For approval, a State plan shall include for designated 
facilities at large municipal waste combustor plants the alternative 
performance testing schedule for dioxins/furans specified in 
Sec. 60.58b(g)(5)(iii) of subpart Eb of this part, as applicable, for 
those designated facilities that achieve a dioxin/furan emission level 
less than or equal to 15 nanograms per dry standard cubic meter total 
mass, corrected to 7 percent oxygen.
    (c) For approval, a State plan shall include for designated 
facilities at small municipal waste combustor plants the alternative 
performance testing schedule for dioxins/furans specified in 
Sec. 60.58b(g)(5)(iii) of subpart Eb of this part, as applicable, for 
those designated facilities that achieve a dioxin/furan emission level 
less than or equal to 30 nanograms per dry standard cubic meter total 
mass, corrected to 7 percent oxygen.

Sec. 60.39b  Reporting and recordkeeping guidelines and compliance 
schedules.

    (a) For approval, a State plan shall include the reporting and 
recordkeeping provisions listed in Sec. 60.59b of subpart Eb of this 
part, as applicable, except for the siting requirements under 
Sec. 60.59b(a), (b)(5), and (d)(11) of subpart Eb of this part.
    (b) Not later than December 19, 1996, each State in which a 
designated facility is operating shall submit to the Administrator a 
plan to implement and enforce the emission guidelines. The compliance 
schedule specified in this paragraph is in accordance with section 
129(b)(2) of the Act and supersedes the compliance schedule provided in 
Sec. 60.23(a)(1) of subpart B of this part.
    (c) For approval, a State plan shall include the compliance 
schedules specified in paragraphs (c)(1) through (c)(5) of this 
section.
    (1) A State plan shall allow designated facilities located within 
large municipal waste combustor plants to comply wi
FR Doc. 95-30257 Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources
th all requirements 
of a State plan (or close) within 1 year after approval of the State 
plan, except as provided by paragraph (c)(1)(i) and (c)(1)(ii) of this 
section.
    (i) A State plan that allows designated facilities more than 1 year 
but less than 3 years following the date of issuance of a revised 
construction or operation permit, if a permit modification is 

[[Page 65419]]
required, or more than 1 year but less than 3 years following approval 
of the State plan, if a permit modification is not required, shall 
include measurable and enforceable incremental steps of progress toward 
compliance. Suggested measurable and enforceable activities are 
specified in paragraphs (c)(1)(i)(A) through (c)(1)(i)(J) of this 
section.
    (A) Date for obtaining services of an architectural and engineering 
firm regarding the air pollution control device(s);
    (B) Date for obtaining design drawings of the air pollution control 
device(s);
    (C) Date for submittal of permit modifications, if necessary;
    (D) Date for submittal of the final control plan to the 
Administrator. [Sec. 60.21 (h)(1) of subpart B of this part.];
    (E) Date for ordering the air pollution control device(s);
    (F) Date for obtaining the major components of the air pollution 
control device(s);
    (G) Date for initiation of site preparation for installation of the 
air pollution control device(s);
    (H) Date for initiation of installation of the air pollution 
control device(s);
    (I) Date for initial startup of the air pollution control 
device(s); and
    (J) Date for initial performance test(s) of the air pollution 
control device(s).
    (ii) A State plan that allows designated facilities more than 1 
year but up to 3 years after State plan approval to close shall require 
a closure agreement. The closure agreement must include the date of 
plant closure.
    (2) If the State plan requirements for a designated facility 
located within a large municipal waste combustor plant include a 
compliance schedule longer than 1 year after approval of the State plan 
in accordance with paragraph (c)(1)(i) or (c)(1)(ii) of this section, 
the State plan submittal (for approval) shall include performance test 
results for dioxin/furan emissions for each designated facility that 
has a compliance schedule longer than 1 year following the approval of 
the State plan, and the performance test results shall have been 
conducted during or after 1990. The performance test shall be conducted 
according to the procedures in Sec. 60.38b.
    (3) A State plan shall allow designated facilities located within 
small municipal waste combustor plants to comply with all requirements 
of the State plan (or close) within 3 years following the date of 
issuance of a revised construction or operation permit, if a permit 
modification is required, or within 3 years following approval of the 
State plan, if a permit modification is not required.
    (4) A State plan shall require compliance with the municipal waste 
combustor operator training and certification requirements under 
Sec. 60.35b according to the schedule specified in paragraphs (c)(4)(i) 
through (c)(4)(iii) of this section.
    (i) For designated facilities located within small municipal waste 
combustor plants, the State plan shall require compliance with the 
municipal waste combustor operator training and certification 
requirements specified under Sec. 60.54b (a) through (c) of subpart Eb 
of this part by the date 6 months after startup of a designated 
facility or 18 months after State plan approval, whichever is later.
    (ii) For designated facilities located within large municipal waste 
combustor plants, the State plan shall require compliance with the 
municipal waste combustor operator training and certification 
requirements specified under Sec. 60.54b (a) through (c) of subpart Eb 
of this part by the date 6 months after the date of startup or 12 
months after State plan approval, whichever is later.
    (iii) For designated facilities located within small or large 
municipal waste combustor plants, the State plan shall require 
compliance with the requirements specified in Sec. 60.54b (d), (f), and 
(g) of subpart Eb of this part no later than 6 months after startup or 
12 months after State plan approval, whichever is later.
    (A) The requirement specified in Sec. 60.54b(d) of subpart Eb of 
this part does not apply to chief facility operators, shift 
supervisors, and control room operators who have obtained full 
certification from the American Society of Mechanical Engineers on or 
before the date of State plan approval.
    (B) The owner or operator may request that the Administrator waive 
the requirement specified in Sec. 60.54b(d) of subpart Eb of this part 
for chief facility operators, shift supervisors, and control room 
operators who have obtained provisional certification from the American 
Society of Mechanical Engineers on or before the date of State plan 
approval.
    (C) The initial training requirements specified in 
Sec. 60.54b(f)(1) of subpart Eb of this part shall be completed no 
later than the date specified in paragraph (c)(4)(iii)(C)(1), 
(c)(4)(iii)(C)(2), or (c)(4)(iii)(C)(3), of this section whichever is 
later.
    (1) The date 6 months after the date of startup of the affected 
facility;
    (2) Twelve months after State plan approval; or
    (3) The date prior to the day when the person assumes 
responsibilities affecting municipal waste combustor unit operation.
    (5) A State plan shall require all designated facilities for which 
construction, modification, or reconstruction is commenced after June 
26, 1987 that are located within a large municipal waste combustor 
plant to comply with the emission limit for mercury specified in 
Sec. 60.33b(a)(3) and the emission limit for dioxins/furans specified 
in Sec. 60.33b(c)(1) within 1 year following issuance of a revised 
construction or operation permit, if a permit modification is required, 
or within 1 year following approval of the State plan, whichever is 
later.
    (d) In the event no plan for implementing the emission guidelines 
is adopted, all designated facilities meeting the applicability 
requirements under Sec. 60.32b shall be in compliance with the 
guidelines no later than December 19, 2000.
    8. Part 60 is amended by adding subpart Eb as follows:
Subpart Eb--Standards of Performance for Municipal Waste Combustors for 
Which Construction is Commenced After September 20, 1994
Sec.
60.50b  Applicability and delegation of authority.
60.51b  Definitions.
60.52b  Standards for municipal waste combustor metals, acid gases, 
organics, and nitrogen oxides.
60.53b  Standards for municipal waste combustor operating practices.
60.54b  Standards for municipal waste combustor operator training 
and certification.
60.55b  Standards for municipal waste combustor fugitive ash 
emissions.
60.56b  Standards for air curtain incinerators.
60.57b  Siting requirements.
60.58b  Compliance and performance testing.
60.59b  Reporting and recordkeeping requirements.

Subpart Eb--Standards of Performance for Municipal Waste Combustors 
for Which Construction is Commenced After September 20, 1994

Sec. 60.50b  Applicability and delegation of authority.

    (a) The affected facility to which this subpart applies is each 
municipal waste combustor unit located within a municipal waste 
combustor plant with an aggregate municipal waste combustor plant 
capacity greater than 35 megagrams per day of municipal solid waste for 
which construction is commenced after September 20, 1994 or for which 
modification or reconstruction is commenced after June 19, 1996. 

[[Page 65420]]

    (b) Any waste combustion unit at a medical, industrial, or other 
type of waste combustor plant that is capable of combusting more than 
35 megagrams per day of municipal solid waste and is subject to a 
federally enforceable permit limiting the plantwide maximum amount of 
municipal solid waste that may be combusted to less than or equal to 10 
megagrams per day is not subject to this subpart if the owner or 
operator:
    (1) Notifies the Administrator of an exemption claim;
    (2) Provides a copy of the federally enforceable permit that limits 
the firing of municipal solid waste to less than 10 megagrams per day; 
and
    (3) Keeps records of the amount of municipal solid waste fired on a 
daily basis.
    (c) An affected facility to which this subpart applies is not 
subject to subpart E or Ea of this part.
    (d) Physical or operational changes made to an existing municipal 
waste combustor unit primarily for the purpose of complying with 
emission guidelines under subpart Cb are not considered a modification 
or reconstruction and do not result in an existing municipal waste 
combustor unit becoming subject to this subpart.
    (e) A qualifying small power production facility, as defined in 
section 3(17)(C) of the Federal Power Act (16 U.S.C. 796(17)(C)), that 
burns homogeneous waste (such as automotive tires or used oil, but not 
including refuse-derived fuel) for the production of electric energy is 
not subject to this subpart if the owner or operator of the facility 
notifies the Administrator of this exemption and provides data 
documenting that the facility qualifies for this exemption.
    (f) A qualifying cogeneration facility, as defined in section 
3(18)(B) of the Federal Power Act (16 U.S.C. 796(18)(B)), that burns 
homogeneous waste (such as automotive tires or used oil, but not 
including refuse-derived fuel) for the production of electric energy 
and steam or forms of useful energy (such as heat) that are used for 
industrial, commercial, heating, or cooling purposes, is not subject to 
this subpart if the owner or operator of the facility notifies the 
Administrator of this exemption and provides data documenting that the 
facility qualifies for this exemption.
    (g) Any unit combusting a single-item waste stream of tires is not 
subject to this subpart if the owner or operator of the unit:
    (1) Notifies the Administrator of an exemption claim; and
    (3) Provides data documenting that the unit qualifies for this 
exemption.
    (h) Any unit required to have a permit under section 3005 of the 
Solid Waste Disposal Act is not subject to this subpart.
    (i) Any materials recovery facility (including primary or secondary 
smelters) that combusts waste for the primary purpose of recovering 
metals is not subject to this subpart.
    (j) Any cofired combustor, as defined under Sec. 60.51b, located at 
a plant that meets the capacity specifications in paragraph (a) of this 
section is not subject to this subpart if the owner or operator of the 
cofired combustor:
    (1) Notifies the Administrator of an exemption claim;
    (2) Provides a copy of the federally enforceable permit (specified 
in the definition of cofired combustor in this section); and
    (3) Keeps a record on a calendar quarter basis of the weight of 
municipal solid waste combusted at the cofired combustor and the weight 
of all other fuels combusted at the cofired combustor.
    (k) Air curtain incinerators, as defined under Sec. 60.51b, located 
at a plant that meet the capacity specifications in paragraph (a) of 
this section and that combust a fuel stream composed of 100 percent 
yard waste are exempt from all provisions of this subpart except the 
opacity limit under Sec. 60.56b, the testing procedures under 
Sec. 60.58b(l), and the reporting and recordkeeping provisions under 
Sec. 60.59b (e) and (i).
    (l) Air curtain incinerators located at plants that meet the 
capacity specifications in paragraph (a) of this section combusting 
municipal solid waste other than yard waste are subject to all 
provisions of this subpart.
    (m) Pyrolysis/combustion units that are an integrated part of a 
plastics/rubber recycling unit (as defined in Sec. 60.51b) are not 
subject to this subpart if the owner or operator of the plastics/rubber 
recycling unit keeps records of the weight of plastics, rubber, and/or 
rubber tires processed on a calendar quarter basis; the weight of 
chemical plant feedstocks and petroleum refinery feedstocks produced 
and marketed on a calendar quarter basis; and the name and address of 
the purchaser of the feedstocks. The combustion of gasoline, diesel 
fuel, jet fuel, fuel oils, residual oil, refinery gas, petroleum coke, 
liquified petroleum gas, propane, or butane produced by chemical plants 
or petroleum refineries that use feedstocks produced by plastics/rubber 
recycling units are not subject to this subpart.
    (n) The following authorities shall be retained by the 
Administrator and not transferred to a State: None.
    (o) This subpart shall become effective June 19, 1996.

Sec. 60.51b  Definitions.

    Air curtain incinerator means an incinerator that operates by 
forcefully projecting a curtain of air across an open chamber or pit in 
which burning occurs. Incinerators of this type can be constructed 
above or below ground and with or without refractory walls and floor.
    Batch municipal waste combustor means a municipal waste combustor 
unit designed so that it cannot combust municipal solid waste 
continuously 24 hours per day because the design does not allow waste 
to be fed to the unit or ash to be removed while combustion is 
occurring.
    Bubbling fluidized bed combustor means a fluidized bed combustor in 
which the majority of the bed material remains in a fluidized state in 
the primary combustion zone.
    Calendar quarter means a consecutive 3-month period 
(nonoverlapping) beginning on January 1, April 1, July 1, and October 
1.
    Calendar year means the period including 365 days starting January 
1 and ending on December 31.
    Chief facility operator means the person in direct charge and 
control of the operation of a municipal waste combustor and who is 
responsible for daily onsite supervision, technical direction, 
management, and overall performance of the facility.
    Circulating fluidized bed combustor means a fluidized bed combustor 
in which the majority of the fluidized bed material is carried out of 
the primary combustion zone and is transported back to the primary zone 
through a recirculation loop.
    Clean wood means untreated wood or untreated wood products 
including clean untreated lumber, tree stumps (whole or chipped), and 
tree limbs (whole or chipped). Clean wood does not include yard waste, 
which is defined elsewhere in this section, or construction, 
renovation, and demolition wastes (including but not limited to 
railroad ties and telephone poles), which are exempt from the 
definition of municipal solid waste in this section.
    Cofired combustor means a unit combusting municipal solid waste 
with nonmunicipal solid waste fuel (e.g., coal, industrial process 
waste) and subject to a federally enforceable permit limiting the unit 
to combusting a fuel feed stream, 30 percent or less of the weight of 
which is comprised, in aggregate, of municipal solid waste as measured 
on a calendar quarter basis.

[[Page 65421]]

    Continuous emission monitoring system means a monitoring system for 
continuously measuring the emissions of a pollutant from an affected 
facility.
    Dioxin/furan means tetra- through octa- chlorinated dibenzo-p-
dioxins and dibenzofurans.
    Federally enforceable means all limitations and conditions that are 
enforceable by the Administrator including the requirements of 40 CFR 
parts 60, 61, and 63, requirements within any applicable State 
implementation plan, and any permit requirements established under 40 
CFR 52.21 or under 40 CFR 51.18 and 40 CFR 51.24.
    First calendar half means the period starting on January 1 and 
ending on June 30 in any year.
    Four-hour block average or 4-hour block average means the average 
of all hourly emission concentrations when the affected facility is 
operating and combusting municipal solid waste measured over 4-hour 
periods of time from 12:00 midnight to 4 a.m., 4 a.m. to 8 a.m., 8 a.m. 
to 12:00 noon, 12:00 noon to 4 p.m., 4 p.m. to 8 p.m., and 8 p.m. to 
12:00 midnight.
    Large municipal waste combustor plant means a municipal waste 
combustor plant with a municipal waste combustor aggregate plant 
capacity for affected facilities that is greater than 225 megagrams per 
day of municipal solid waste.
    Mass burn refractory municipal waste combustor means a field-
erected combustor that combusts municipal solid waste in a refractory 
wall furnace. Unless otherwise specified, this includes combustors with 
a cylindrical rotary refractory wall furnace.
    Mass burn rotary waterwall municipal waste combustor means a field-
erected combustor that combusts municipal solid waste in a cylindrical 
rotary waterwall furnace.
    Mass burn waterwall municipal waste combustor means a field-erected 
combustor that combusts municipal solid waste in a waterwall furnace.
    Materials separation plan means a plan that identifies both a goal 
and an approach to separate certain components of municipal solid waste 
for a given service area in order to make the separated materials 
available for recycling. A materials separation plan may include 
elements such as dropoff facilities, buy-back or deposit-return 
incentives, curbside pickup programs, or centralized mechanical 
separation systems. A materials separation plan may include different 
goals or approaches for different subareas in the service area, and may 
include no materials separation activities for certain subareas or, if 
warranted, an entire service area.
    Maximum demonstrated municipal waste combustor unit load means the 
highest 4-hour arithmetic average municipal waste combustor unit load 
achieved during four consecutive hours during the most recent dioxin/
furan performance test demonstrating compliance with the applicable 
limit for municipal waste combustor organics specified under 
Sec. 60.52b(c).
    Maximum demonstrated particulate matter control device temperature 
means the highest 4-hour arithmetic average flue gas temperature 
measured at the particulate matter control device inlet during four 
consecutive hours during the most recent dioxin/furan performance test 
demonstrating compliance with the applicable limit for municipal waste 
combustor organics specified under Sec. 60.52b(c).
    Modification or modified municipal waste combustor unit means a 
municipal waste combustor unit to which changes have been made after 
June 19, 1996 if the cumulative cost of the changes, over the life of 
the unit, exceed 50 percent of the original cost of construction and 
installation of the unit (not including the cost of any land purchased 
in connection with such construction or installation) updated to 
current costs; or any physical change in the municipal waste combustor 
unit or change in the method of operation of the municipal waste 
combustor unit increases the amount of any air pollutant emitted by the 
unit for which standards have been established under section 129 or 
section 111. Increases in the amount of any air pollutant emitted by 
the municipal waste combustor unit are determined at 100-percent 
physical load capability and downstream of all air pollution control 
devices, with no consideration given for load restrictions based on 
permits or other nonphysical operational restrictions.
    Modular excess-air municipal waste combustor means a combustor that 
combusts municipal solid waste and that is not field-erected and has 
multiple combustion chambers, all of which are designed to operate at 
conditions with combustion air amounts in excess of theoretical air 
requirements.
    Modular starved-air municipal waste combustor means a combustor 
that combusts municipal solid waste and that is not field-erected and 
has multiple combustion chambers in which the primary combustion 
chamber is designed to operate at substoichiometric conditions.
    Municipal solid waste or municipal-type solid waste or MSW means 
household, commercial/retail, and/or institutional waste. Household 
waste includes material discarded by single and multiple residential 
dwellings, hotels, motels, and other similar permanent or temporary 
housing establishments or facilities. Commercial/retail waste includes 
material discarded by stores, offices, restaurants, warehouses, 
nonmanufacturing activities at industrial facilities, and other similar 
establishments or facilities. Institutional waste includes material 
discarded by schools, nonmedical waste discarded by hospitals, material 
discarded by nonmanufacturing activities at prisons and government 
facilities, and material discarded by other similar establishments or 
facilities. Household, commercial/retail, and institutional waste does 
not include used oil; sewage sludge; wood pallets; construction, 
renovation, and demolition wastes (which includes but is not limited to 
railroad ties and telephone poles); clean wood; industrial process or 
manufacturing wastes; medical waste; or motor vehicles (including motor 
vehicle parts or vehicle fluff). Household, commercial/retail, and 
institutional wastes include:
    (1) Yard waste;
    (2) Refuse-derived fuel; and
    (3) Motor vehicle maintenance materials limited to vehicle 
batteries and tires except as specified in Sec. 60.50b(g).
    Municipal waste combustor, MWC, or municipal waste combustor unit: 
(1) Means any setting or equipment that combusts solid, liquid, or 
gasified municipal solid waste including, but not limited to, field-
erected incinerators (with or without heat recovery), modular 
incinerators (starved-air or excess-air), boilers (i.e., steam 
generating units), furnaces (whether suspension-fired, grate-fired, 
mass-fired, air curtain incinerators, or fluidized bed-fired), and 
pyrolysis/combustion units. Municipal waste combustors do not include 
pyrolysis/combustion units located at a plastics/rubber recycling unit 
(as specified in Sec. 60.50b(m) of this section). Municipal waste 
combustors do not include internal combustion engines, gas turbines, or 
other combustion devices that combust landfill gases collected by 
landfill gas collection systems.
    (2) The boundaries of a municipal solid waste combustor are defined 
as follows. The municipal waste combustor unit includes, but is not 
limited to, the municipal solid waste fuel feed system, grate system, 
flue gas system, bottom ash system, and the combustor water system. The 
municipal waste combustor boundary starts at the 

[[Page 65422]]
municipal solid waste pit or hopper and extends through:
    (i) The combustor flue gas system, which ends immediately following 
the heat recovery equipment or, if there is no heat recovery equipment, 
immediately following the combustion chamber,
    (ii) The combustor bottom ash system, which ends at the truck 
loading station or similar ash handling equipment that transfer the ash 
to final disposal, including all ash handling systems that are 
connected to the bottom ash handling system; and
    (iii) The combustor water system, which starts at the feed water 
pump and ends at the piping exiting the steam drum or superheater.
    (3) The municipal waste combustor unit does not include air 
pollution control equipment, the stack, water treatment equipment, or 
the turbine-generator set.
    Municipal waste combustor acid gases means all acid gases emitted 
in the exhaust gases from municipal waste combustor units including, 
but not limited to, sulfur dioxide and hydrogen chloride gases.
    Municipal waste combustor metals means metals and metal compounds 
emitted in the exhaust gases from municipal waste combustor units.
    Municipal waste combustor organics means organic compounds emitted 
in the exhaust gases from municipal waste combustor units and includes 
tetra-through octa- chlorinated dibenzo-p-dioxins and dibenzofurans.
    Municipal waste combustor plant means one or more municipal waste 
combustor units at the same location for which construction, 
modification, or reconstruction is commenced after September 20, 1994.
    Municipal waste combustor plant capacity means the aggregate 
municipal waste combustor unit capacity of all municipal waste 
combustor units at a municipal waste combustor plant for which 
construction, modification, or reconstruction of the units commenced 
after September 20, 1994. Any municipal waste combustor units for which 
construction, modification, or reconstruction is commenced on or before 
September 20, 1994 are not included for determining applicability under 
this subpart.
    Municipal waste combustor unit capacity means the maximum charging 
rate of a municipal waste combustor unit expressed in megagrams per day 
of municipal solid waste combusted, calculated according to the 
procedures under Sec. 60.58b(j). Section 60.58b(j) includes procedures 
for determining municipal waste combustor unit capacity for continuous 
and batch feed municipal waste combustors.
    Municipal waste combustor unit load means the steam load of the 
municipal waste combustor unit measured as specified in 
Sec. 60.58b(i)(6).
    Particulate matter means total particulate matter emitted from 
municipal waste combustor units as measured by EPA Reference Method 5 
(see Sec. 60.58b(c)).
    Plastics/rubber recycling unit means an integrated processing unit 
where plastics, rubber, and/or rubber tires are the only feed materials 
(incidental contaminants may be included in the feed materials) and 
they are processed into a chemical plant feedstock or petroleum 
refinery feedstock, where the feedstock is marketed to and used by a 
chemical plant or petroleum refinery as input feedstock. The combined 
weight of the chemical plant feedstock and petroleum refinery feedstock 
produced by the plastics/rubber recycling unit on a calendar quarter 
basis shall be more than 70 percent of the combined weight of the 
plastics, rubber, and rubber tires processed by the plastics/rubber 
recycling unit on a calendar quarter basis. The plastics, rubber, and/
or rubber tire feed materials to the plastics/rubber recycling unit may 
originate from the separation or diversion of plastics, rubber, or 
rubber tires from MSW or industrial solid waste, and may include 
manufacturing scraps, trimmings, and off-specification plastics, 
rubber, and rubber tire discards. The plastics, rubber, and rubber tire 
feed materials to the plastics/rubber recycling unit may contain 
incidental contaminants (e.g., paper labels on plastic bottles, metal 
rings on plastic bottle caps, etc.).
    Potential hydrogen chloride emission concentration means the 
hydrogen chloride emission concentration that would occur from 
combustion of municipal solid waste in the absence of any emission 
controls for municipal waste combustor acid gases.
    Potential mercury emission concentration means the mercury emission 
concentration that would occur from combustion of municipal solid waste 
in the absence of any mercury emissions control.
    Potential sulfur dioxide emissions means the sulfur dioxide 
emission concentration that would occur from combustion of municipal 
solid waste in the absence of any emission controls for municipal waste 
combustor acid gases.
    Pulverized coal/refuse-derived fuel mixed fuel-fired combustor 
means a combustor that fires coal and refuse-derived fuel 
simultaneously, in which pulverized coal is introduced into an air 
stream that carries the coal to the combustion chamber of the unit 
where it is fired in suspension. This includes both conventional 
pulverized coal and micropulverized coal.
    Pyrolysis/combustion unit means a unit that produces gases, 
liquids, or solids through the heating of municipal solid waste, and 
the gases, liquids, or solids produced are combusted and emissions 
vented to the atmosphere.
    Reconstruction means rebuilding a municipal waste combustor unit 
for which the reconstruction commenced after June 19, 1996, and the 
cumulative costs of the construction over the life of the unit exceed 
50 percent of the original cost of construction and installation of the 
unit (not including any cost of land purchased in connection with such 
construction or installation) updated to current costs (current 
dollars).
    Refractory unit or refractory wall furnace means a combustion unit 
having no energy recovery (e.g., via a waterwall) in the furnace (i.e., 
radiant heat transfer section) of the combustor.
    Refuse-derived/fuel means a type of municipal solid waste produced 
by processing municipal solid waste through shredding and size 
classification. This includes all classes of refuse-derived fuel 
including low-density fluff refuse-derived fuel through densified 
refuse-derived fuel and pelletized refuse-derived fuel.
    Refuse-derived fuel stoker means a steam generating unit that 
combusts refuse-derived fuel in a semisuspension firing mode using air-
fed distributors.
    Same location means the same or contiguous property that is under 
common ownership or control including properties that are separated 
only by a street, road, highway, or other public right-of-way. Common 
ownership or control includes properties that are owned, leased, or 
operated by the same entity, parent entity, subsidiary, subdivision, or 
any combination thereof including any municipality or other 
governmental unit, or any quasi-governmental authority (e.g., a public 
utility district or regional waste disposal authority).
    Second calendar half means the period starting July 1 and ending on 
December 31 in any year.
    Shift supervisor means the person who is in direct charge and 
control of the operation of a municipal waste combustor and who is 
responsible for onsite supervision, technical direction, management, 
and overall performance of the facility during an assigned shift.
    Small municipal waste combustor plant means a municipal waste 
combustor plant with a municipal waste combustor plant capacity for 
affected 

[[Page 65423]]
facilities that is greater than 35 megagrams per day but equal to or 
less than 225 megagrams per day of municipal solid waste.
    Spreader stoker coal/refuse-derived fuel mixed fuel-fired combustor 
means a combustor that fires coal and refuse-derived fuel 
simultaneously, in which coal is introduced to the combustion zone by a 
mechanism that throws the fuel onto a grate from above. Combustion 
takes place both in suspension and on the grate.
    Standard conditions means a temperature of 20 deg. C and a pressure 
of 101.3 kilopascals.
    Total mass dioxin/furan or total mass means the total mass of 
tetra- through octa- chlorinated dibenzo-p-dioxins and dibenzofurans, 
as determined using EPA Reference Method 23 and the procedures 
specified under Sec. 60.58b(g).
    Twenty-four hour daily average or 24-hour daily average means 
either the arithmetic mean or geometric mean (as specified) of all 
hourly emission concentrations when the affected facility is operating 
and combusting municipal solid waste measured over a 24-hour period 
between 12:00 midnight and the following midnight.
    Untreated lumber means wood or wood products that have been cut or 
shaped and include wet, air-dried, and kiln-dried wood products. 
Untreated lumber does not include wood products that have been painted, 
pigment-stained, or ``pressure-treated.'' Pressure-treating compounds 
include, but are not limited to, chromate copper arsenate, 
pentachlorophenol, and creosote.
    Waterwall furnace means a combustion unit having energy (heat) 
recovery in the furnace (i.e., radiant heat transfer section) of the 
combustor.
    Yard waste means grass, grass clippings, bushes, shrubs, and 
clippings from bushes and shrubs that are generated by residential, 
commercial/retail, institutional, and/or industrial sources as part of 
maintenance activities associated with yards or other private or public 
lands. Yard waste does not include construction, renovation, and 
demolition wastes, which are exempt from the definition of municipal 
solid waste in this section. Yard waste does not include clean wood, 
which is exempt from the definition of municipal solid waste in this 
section.

Sec. 60.52b  Standards for municipal waste combustor metals, acid 
gases, organics, and nitrogen oxides.

    (a) The limits for municipal waste combustor metals are specified 
in paragraphs (a)(1) through (a)(5) of this section.
    (1) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from that affected facility any gases 
that contain particulate matter in excess of 24 milligrams per dry 
standard cubic meter, corrected to 7 percent oxygen.
    (2) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from that affected facility any gases 
that exhibit greater than 10 percent opacity (6-minute average).
    (3) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from that affected facility any gases 
that contain cadmium in excess of 0.020 milligrams per dry standard 
cubic meter, corrected to 7 percent oxygen.
    (4) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from the affected facility any gases 
that contain lead in excess of 0.20 milligrams per dry standard cubic 
meter, corrected to 7 percent oxygen.
    (5) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from the affected facility any gases 
that contain mercury in excess of 0.080 milligrams per dry standard 
cubic meter or 15 percent of the potential mercury emission 
concentration (85-percent reduction by weight), corrected to 7 percent 
oxygen, whichever is less stringent.
    (b) The limits for municipal waste combustor acid gases are 
specified in paragraphs (b)(1) and (b)(2) of this section.
    (1) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from that affected facility any gases 
that contain sulfur dioxide in excess of 30 parts per million by volume 
or 20 percent of the potential sulfur dioxide emission concentration 
(80-percent reduction by weight or volume), corrected to 7 percent 
oxygen (dry basis), whichever is less stringent. The averaging time is 
specified under Sec. 60.58b(e).
    (2) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from that affected facility any gases 
that contain hydrogen chloride in excess of 25 parts per million by 
volume or 5 percent of the potential hydrogen chloride emission 
concentration (95-percent reduction by weight or volume), corrected to 
7 percent oxygen (dry basis), whichever is less stringent.
    (c) The limits for municipal waste combustor organics are specified 
in paragraphs (c)(1) and (c)(2) of this section.
    (1) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant for which 
construction, modification, or reconstruction commences after September 
20, 1994, but on or before November 20, 1997 shall cause to be 
discharged into the atmosphere from that affected facility any gases 
that contain dioxin/furan emissions that exceed 30 nanograms per dry 
standard cubic meter (total mass), corrected to 7 percent oxygen, for 
the first 3 years following the date of initial startup. After the 
first 3 years following the date of initial startup, no owner or 
operator shall cause to be discharged into the atmosphere from that 
affected facility any gases that contain dioxin/furan total mass 
emissions that exceed 13 nanograms per dry standard cubic meter (total 
mass), corrected to 7 percent oxygen.
    (2) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant for which 
construction, 

[[Page 65424]]
modification, or reconstruction commences after November 20, 1997 shall 
cause to be discharged into the atmosphere from that affected facility 
any gases that contain dioxin/furan total mass emissions that exceed 13 
nanograms per dry standard cubic meter (total mass), corrected to 7 
percent oxygen.
    (d) The limits for nitrogen oxides are specified in paragraphs 
(d)(1) and (d)(2) of this section.
    (1) During the first year of operation after the date on which the 
initial performance test is completed or is required to be completed 
under Sec. 60.8 of subpart A of this part, no owner or operator of an 
affected facility located within a large municipal waste combustor 
plant shall cause to be discharged into the atmosphere from that 
affected facility any gases that contain nitrogen oxides in excess of 
180 parts per million by volume, corrected to 7 percent oxygen (dry 
basis). The averaging time is specified under Sec. 60.58b(h).
    (2) After the first year of operation following the date on which 
the initial performance test is completed or is required to be 
completed under Sec. 60.8 of subpart A of this part, no owner or 
operator of an affected facility located within a large municipal waste 
combustor plant shall cause to be discharged into the atmosphere from 
that affected facility any gases that contain nitrogen oxides in excess 
of 150 parts per million by volume, corrected to 7 percent oxygen (dry 
basis). The averaging time is specified under Sec. 60.58b(h).

Sec. 60.53b  Standards for municipal waste combustor operating 
practices.

    (a) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged into the atmosphere from that affected facility any gases 
that contain carbon monoxide in excess of the emission limits specified 
in table 1 of this subpart.

         Table 1.--Municipal Waste Combustor Operating Standards        
------------------------------------------------------------------------
                                       Carbon monoxide                  
                                       emission limit                   
Municipal waste combustor technology     (parts per      Averaging time 
                                         million by          (hours)    
                                          volume) a                     
------------------------------------------------------------------------
Mass burn waterwall.................               100                 4
Mass burn refractory................               100                 4
Mass burn rotary waterwall..........               100                24
Modular starved air.................                50                 4
Modular excess air..................                50                 4
Refuse-derived fuel stoker..........               150                24
Bubbling fluidized bed combustor....               100                 4
Circulating fluidized bed combustor.               100                 4
Pulverized coal/refuse-derived fuel                                     
 mixed fuel-fired combustor.........               150                 4
Spreader stoker coal/refuse-derived                                     
 fuel mixed fuel-fired combustor....               150                24
------------------------------------------------------------------------
a Measured at the combustor outlet in conjunction with a measurement of 
  oxygen concentration, corrected to 7 percent oxygen (dry basis). The  
  averaging times are specified in greater detail in Sec.  60.58b(i).   

    (b) No owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall cause such 
facility to operate at a load level greater than 110 percent of the 
maximum demonstrated municipal waste combustor unit load as defined in 
Sec. 60.51b, except as specified in paragraphs (b)(1) and (b)(2) of 
this section. The averaging time is specified under Sec. 60.58b(i).
    (1) During the annual dioxin/furan performance test and the 2 weeks 
preceding the annual dioxin/furan performance test, no municipal waste 
combustor unit load limit is applicable.
    (2) The municipal waste combustor unit load limit may be waived in 
accordance with permission granted by the Administrator or delegated 
State regulatory authority for the purpose of evaluating system 
performance, testing new technology or control technologies, diagnostic 
testing, or related activities for the purpose of improving facility 
performance or advancing the state-of-the-art for controlling facility 
emissions.
    (c) No owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall cause such 
facility to operate at a temperature, measured at the particulate 
matter control device inlet, exceeding 17  deg.C above the maximum 
demonstrated particulate matter control device temperature as defined 
in Sec. 60.51b, except as specified in paragraphs (c)(1) and (c)(2) of 
this section. The averaging time is specified under Sec. 60.58b(i). The 
requirements specified in this paragraph apply to each particulate 
matter control device utilized at the affected facility.
    (1) During the annual dioxin/furan performance test and the 2 weeks 
preceding the annual dioxin/furan performance test, no particulate 
matter control device temperature limitations are applicable.
    (2) The particulate matter control device temperature limits may be 
waived in accordance with permission granted by the Administrator or 
delegated State regulatory authority for the purpose of evaluating 
system performance, testing new technology or control technologies, 
diagnostic testing, or related activities for the purpose of improving 
facility performance or advancing the state-of-the-art for controlling 
facility emissions.

Sec. 60.54b  Standards for municipal waste combustor operator training 
and certification.

    (a) No later than the date 6 months after the date of startup of an 
affected facility located within a small or large municipal waste 
combustor plant or on December 19, 1996, whichever is later, each chief 
facility operator and shift supervisor shall obtain and maintain a 
current provisional operator certification from either the American 
Society of Mechanical Engineers [QRO-1-1994 (incorporated by 
reference--see Sec. 60.17 of subpart A of this part)] or a State 
certification program.
    (b) Not later than the date 6 months after the date of startup of 
an affected facility located within a small or large municipal waste 
combustor plant or on December 19, 1996, whichever is later, each chief 
facility operator and shift 

[[Page 65425]]
supervisor shall have completed full certification or shall have 
scheduled a full certification exam with either the American Society of 
Mechanical Engineers [QRO-1-1994 (incorporated by reference--see 
Sec. 60.17 of subpart A of this part)] or a State certification 
program.
    (c) No owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall allow the facility 
to be operated at any time unless one of the following persons is on 
duty and at the affected facility: A fully certified chief facility 
operator, a provisionally certified chief facility operator who is 
scheduled to take the full certification exam according to the schedule 
specified in paragraph (b) of this section, a fully certified shift 
supervisor, or a provisionally certified shift supervisor who is 
scheduled to take the full certification exam according to the schedule 
specified in paragraph (b) of this section.
    (i) The requirement specified in paragraph (c) of this section 
shall take effect 6 months after the date of startup of the affected 
facility or on December 19, 1996, whichever is later.
    (ii) If one of the persons listed in paragraph (c) of this section 
must leave the affected facility during their operating shift, a 
provisionally certified control room operator who is onsite at the 
affected facility may fulfill the requirement in paragraph (c) of this 
section.
    (d) All chief facility operators, shift supervisors, and control 
room operators at affected facilities located within a small or large 
municipal waste combustor plant must complete the EPA or State 
municipal waste combustor operator training course no later than the 
date 6 months after the date of startup of the affected facility or by 
December 19, 1996, whichever is later.
    (e) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall develop and update 
on a yearly basis a site-specific operating manual that shall, at a 
minimum, address the elements of municipal waste combustor unit 
operation specified in paragraphs (e)(1) through (e)(11) of this 
section.
    (1) A summary of the applicable standards under this subpart;
    (2) A description of basic combustion theory applicable to a 
municipal waste combustor unit;
    (3) Procedures for receiving, handling, and feeding municipal solid 
waste;
    (4) Municipal waste combustor unit startup, shutdown, and 
malfunction procedures;
    (5) Procedures for maintaining proper combustion air supply levels;
    (6) Procedures for operating the municipal waste combustor unit 
within the standards established under this subpart;
    (7) Procedures for responding to periodic upset or off-
specification conditions;
    (8) Procedures for minimizing particulate matter carryover;
    (9) Procedures for handling ash;
    (10) Procedures for monitoring municipal waste combustor unit 
emissions; and
    (11) Reporting and recordkeeping procedures.
    (f) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall establish a 
training program to review the operating manual according to the 
schedule specified in paragraphs (f)(1) and (f)(2) of this section with 
each person who has responsibilities affecting the operation of an 
affected facility including, but not limited to, chief facility 
operators, shift supervisors, control room operators, ash handlers, 
maintenance personnel, and crane/load handlers.
    (1) Each person specified in paragraph (f) of this section shall 
undergo initial training no later than the date specified in paragraph 
(f)(1)(i), (f)(1)(ii), or (f)(1)(iii) of this section whichever is 
later.
    (i) The date 6 months after the date of startup of the affected 
facility;
    (ii) The date prior to the day the person assumes responsibilities 
affecting municipal waste combustor unit operation; or
    (iii) December 19, 1996.
    (2) Annually, following the initial review required by paragraph 
(f)(1) of this section.
    (g) The operating manual required by paragraph (e) of this section 
shall be kept in a readily accessible location for all persons required 
to undergo training under paragraph (f) of this section. The operating 
manual and records of training shall be available for inspection by the 
EPA or its delegated enforcement agency upon request.

Sec. 60.55b  Standards for municipal waste combustor fugitive ash 
emissions.

    (a) On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, no owner or operator of an affected facility located 
within a small or large municipal waste combustor plant shall cause to 
be discharged to the atmosphere visible emissions of combustion ash 
from an ash conveying system (including conveyor transfer points) in 
excess of 5 percent of the observation period (i.e., 9 minutes per 3-
hour period), as determined by EPA Reference Method 22 observations as 
specified in Sec. 60.58b(k), except as provided in paragraphs (b) and 
(c) of this section.
    (b) The emission limit specified in paragraph (a) of this section 
does not cover visible emissions discharged inside buildings or 
enclosures of ash conveying systems; however, the emission limit 
specified in paragraph (a) of this section does cover visible emissions 
discharged to the atmosphere from buildings or enclosures of ash 
conveying systems.
    (c) The provisions specified in paragraph (a) of this section do 
not apply during maintenance and repair of ash conveying systems.

Sec. 60.56b  Standards for air curtain incinerators.

    On and after the date on which the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, the owner or operator of an air curtain incinerator 
located at a plant with a plant capacity to combust greater than 35 
megagrams per day of municipal solid waste and that combusts a fuel 
feed stream composed of 100 percent yard waste and no other municipal 
solid waste materials shall at no time cause to be discharged into the 
atmosphere from that incinerator any gases that exhibit greater than 
10-percent opacity (6-minute average), except that an opacity level of 
up to 35 percent (6-minute average) is permitted during startup periods 
during the first 30 minutes of operation of the unit.

Sec. 60.57b  Siting requirements.

    (a) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant, for which the initial 
application for a construction permit under 40 CFR part 51, subpart I, 
or part 52, as applicable, is submitted after December 19, 1995, shall 
prepare a materials separation plan, as defined in Sec. 60.51b, for the 
affected facility and its service area, and shall comply with the 
requirements specified in paragraphs (a)(1) through (a)(10) of this 
section. The initial application is defined as representing a good 
faith submittal for complying with the requirements under 40 CFR part 
51, subpart I, or part 52, as applicable, as determined by the 
Administrator.
    (1) The owner or operator shall prepare a preliminary draft 
materials separation plan and shall make the plan available to the 
public as specified in 

[[Page 65426]]
paragraphs (a)(1)(i) and (a)(1)(ii) of this section.
    (i) The owner or operator shall distribute the preliminary draft 
materials separation plan to the principal public libraries in the area 
where the affected facility is to be constructed.
    (ii) The owner or operator shall publish a notification of a public 
meeting in the principal newspaper(s) serving the area where the 
affected facility is to be constructed and where the waste treated by 
the affected facility will primarily be collected. As a minimum, the 
notification shall include the information specified in paragraphs 
(a)(1)(ii)(A) through (a)(1)(ii)(D) of this section.
    (A) The date, time, and location of the public meeting.
    (B) The location of the public libraries where the preliminary 
draft materials separation plan may be found, including normal business 
hours of the libraries.
    (C) An agenda of the issues to be discussed at the public meeting.
    (D) The dates that the public comment period on the preliminary 
draft materials separation plan begins and ends.
    (2) The owner or operator shall conduct a public meeting, accept 
comments on the preliminary draft materials separation plan, and comply 
with the requirements specified in paragraphs (a)(2)(i) through 
(a)(2)(iv) of this section.
    (i) The public meeting shall be conducted in the county where the 
affected facility is to be located.
    (ii) The public meeting shall be scheduled to occur 30 days or more 
after making the preliminary draft materials separation plan available 
to the public as specified under paragraph (a)(1) of this section.
    (iii) Suggested issues to be addressed at the public meeting are 
listed in paragraphs (a)(2)(iii)(A) through (a)(2)(iii)(H) of this 
section.
    (A) The expected size of the service area for the affected 
facility.
    (B) The amount of waste generation anticipated for the service 
area.
    (C) The types and estimated amounts of materials proposed for 
separation.
    (D) The methods proposed for materials separation.
    (E) The amount of residual waste to be disposed.
    (F) Alternate disposal methods for handling the residual waste.
    (G) Identification of the location(s) where responses to public 
comment on the preliminary draft materials separation plan will be 
available for inspection, as specified in paragraphs (a)(3) and (a)(4) 
of this section.
    (H) Identification of the locations where the final draft materials 
separation plan will be available for inspection, as specified in 
paragraph (a)(7).
    (iv) Nothing in this section shall preclude an owner or operator 
from combining this public meeting with any other public meeting 
required as part of any other Federal, State, or local permit review 
process except the public meeting required under paragraph (b)(4) of 
this section.
    (3) Following the public meeting required by paragraph (a)(2) of 
this section, the owner or operator shall prepare responses to the 
comments received at the public meeting.
    (4) The owner or operator shall make the document summarizing 
responses to public comments available to the public (including 
distribution to the principal public libraries used to announce the 
meeting) in the service area where the affected facility is to be 
located.
    (5) The owner or operator shall prepare a final draft materials 
separation plan for the affected facility considering the public 
comments received at the public meeting.
    (6) As required under Sec. 60.59b(a), the owner or operator shall 
submit to the Administrator a copy of the notification of the public 
meeting, a transcript of the public meeting, the document summarizing 
responses to public comments, and copies of both the preliminary and 
final draft materials separation plans on or before the time the 
facility's application for a construction permit is submitted under 40 
CFR part 51, subpart I, or part 52, as applicable.
    (7) As part of the distribution of the siting analysis required 
under paragraph (b)(3) of this section, the owner or operator shall 
make the final draft materials separation plan required under paragraph 
(a)(5) of this section available to the public, as specified in 
paragraph (b)(3) of this section.
    (8) As part of the public meeting for review of the siting analysis 
required under paragraph (b)(4) of this section, the owner or operator 
shall address questions concerning the final draft materials separation 
plan required by paragraph (a)(5) of this section including discussion 
of how the final draft materials separation plan has changed from the 
preliminary draft materials separation plan that was discussed at the 
first public meeting required by paragraph (a)(2) of this section.
    (9) If the owner or operator receives any comments on the final 
draft materials separation plan during the public meeting required in 
paragraph (b)(4) of this section, the owner or operator shall respond 
to those comments in the document prepared in accordance with paragraph 
(b)(5) of this section.
    (10) The owner or operator shall prepare a final materials 
separation plan and shall submit, as required under 
Sec. 60.59b(b)(5)(ii), the final materials separation plan as part of 
the initial notification of construction.
    (b) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant, for which the initial 
application for a construction permit under 40 CFR part 51, subpart I, 
or part 52, as applicable, is submitted after December 19, 1995 shall 
prepare a siting analysis in accordance with paragraphs (b)(1) and 
(b)(2) of this section and shall comply with the requirements specified 
in paragraphs (b)(3) through (b)(7) of this section.
    (1) The siting analysis shall be an analysis of the impact of the 
affected facility on ambient air quality, visibility, soils, and 
vegetation.
    (2) The analysis shall consider air pollution control alternatives 
that minimize, on a site-specific basis, to the maximum extent 
practicable, potential risks to the public health or the environment.
    (3) The owner or operator shall make the siting analysis and final 
draft materials separation plan required by paragraph (a)(5) of this 
section available to the public as specified in paragraphs (b)(3)(i) 
and (b)(3)(ii) of this section.
    (i) The owner or operator shall distribute the siting analysis and 
final draft materials separation plan to the principal public libraries 
in the area where the affected facility is to be constructed.
    (ii) The owner or operator shall publish a notification of a public 
meeting in the principal newspaper(s) serving the area where the 
affected facility is to be constructed and where the waste treated by 
the affected facility will primarily be collected. As a minimum, the 
notification shall include the information specified in paragraphs 
(b)(3)(ii)(A) through (b)(3)(ii)(D) of this section.
    (A) The date, time, and location of the public meeting.
    (B) The location of the public libraries where the siting analyses 
and final draft materials separation plan may be found, including 
normal business hours.
    (C) An agenda of the issues to be discussed at the public meeting.
    (D) The dates that the public comment period on the siting analyses 
and final draft materials separation plan begins and ends. 

[[Page 65427]]

    (4) The owner or operator shall conduct a public meeting and accept 
comments on the siting analysis and the final draft materials 
separation plan required under paragraph (a)(5) of this section. The 
public meeting shall be conducted in the county where the affected 
facility is to be located and shall be scheduled to occur 30 days or 
more after making the siting analysis available to the public as 
specified under paragraph (b)(3) of this section.
    (5) The owner or operator shall prepare responses to the comments 
on the siting analysis and the final draft materials separation plan 
that are received at the public meeting.
    (6) The owner or operator shall make the document summarizing 
responses to public comments available to the public (including 
distribution to all public libraries) in the service area where the 
affected facility is to be located.
    (7) As required under Sec. 60.59b(b)(5), the owner or operator 
shall submit a copy of the notification of the public meeting, a 
transcript of the public meeting, the document summarizing responses to 
public comments, and the siting analysis as part of the initial 
notification of construction.
    (c) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant, for which construction 
is commenced after September 20, 1994 shall prepare a siting analysis 
in accordance with 40 CFR part 51, Subpart I, or part 52, as 
applicable, and shall submit the siting analysis as part of the initial 
notification of construction. Affected facilities subject to paragraphs 
(a) and (b) of this section are not subject to this paragraph.

Sec. 60.58b  Compliance and performance testing.

    (a) The provisions for startup, shutdown, and malfunction are 
provided in paragraphs (a)(1) and (a)(2) of this section.
    (1) Except as provided by Sec. 60.56b, the standards under this 
subpart apply at all times except during periods of startup, shutdown, 
or malfunction. Duration of startup, shutdown, or malfunction periods 
are limited to 3 hours per occurrence.
    (i) The startup period commences when the affected facility begins 
the continuous burning of municipal solid waste and does not include 
any warmup period when the affected facility is combusting fossil fuel 
or other nonmunicipal solid waste fuel, and no municipal solid waste is 
being fed to the combustor.
    (ii) Continuous burning is the continuous, semicontinuous, or batch 
feeding of municipal solid waste for purposes of waste disposal, energy 
production, or providing heat to the combustion system in preparation 
for waste disposal or energy production. The use of municipal solid 
waste solely to provide thermal protection of the grate or hearth 
during the startup period when municipal solid waste is not being fed 
to the grate is not considered to be continuous burning.
    (2) The opacity limits for air curtain incinerators specified in 
Sec. 60.56b apply at all times as specified under Sec. 60.56b except 
during periods of malfunction. Duration of malfunction periods are 
limited to 3 hours per occurrence.
    (b) The owner or operator of a small or large municipal waste 
combustor plant shall install, calibrate, maintain, and operate a 
continuous emission monitoring system and record the output of the 
system for measuring the oxygen or carbon dioxide content of the flue 
gas at each location where carbon monoxide, sulfur dioxide, or nitrogen 
oxides emissions are monitored and shall comply with the test 
procedures and test methods specified in paragraphs (b)(1) through 
(b)(7) of this section.
    (1) The span value of the oxygen (or carbon dioxide) monitor shall 
be 25 percent oxygen (or carbon dioxide).
    (2) The monitor shall be installed, evaluated, and operated in 
accordance with Sec. 60.13 of subpart A of this part.
    (3) The initial performance evaluation shall be completed no later 
than 180 days after the date of initial startup of the municipal waste 
combustor, as specified under Sec. 60.8 of subpart A of this part.
    (4) The monitor shall conform to Performance Specification 3 in 
appendix B of this part except for section 2.3 (relative accuracy 
requirement).
    (5) The quality assurance procedures of appendix F of this part 
except for section 5.1.1 (relative accuracy test audit) shall apply to 
the monitor.
    (6) If carbon dioxide is selected for use in diluent corrections, 
the relationship between oxygen and carbon dioxide levels shall be 
established during the initial performance test according to the 
procedures and methods specified in paragraphs (b)(6)(i) through 
(b)(6)(iv) of this section. This relationship may be reestablished 
during performance compliance tests.
    (i) The emission rate correction factor and the integrated bag 
sampling and analysis procedure of EPA Reference Method 3B shall be 
used to determine the oxygen concentration at the same location as the 
carbon dioxide monitor.
    (ii) Samples shall be taken for at least 30 minutes in each hour.
    (iii) Each sample shall represent a 1-hour average.
    (iv) A minimum of three runs shall be performed.
    (7) As required by Sec. 60.59b(f)(5), the relationship between 
carbon dioxide and oxygen concentrations that is established in 
accordance with paragraph (b)(6) of this section shall be submitted to 
the EPA as part of the initial performance test report.
    (c) The procedures and test methods specified in paragraphs (c)(1) 
through (c)(11) of this section shall be used to determine compliance 
with the emission limits for particulate matter and opacity under 
Sec. 60.52b(a)(1) and (a)(2).
    (1) The EPA Reference Method 1 shall be used to select sampling 
site and number of traverse points.
    (2) The EPA Reference Method 3 shall be used for gas analysis.
    (3) The EPA Reference Method 5 shall be used for determining 
compliance with the particulate matter emission limit. The minimum 
sample volume shall be 1.7 cubic meters. The probe and filter holder 
heating systems in the sample train shall be set to provide a gas 
temperature no greater than 160plus-minus14  deg.C. An oxygen or 
carbon dioxide measurement shall be obtained simultaneously with each 
Method 5 run.
    (4) An owner or operator may request that compliance with the 
particulate matter emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (5) As specified under Sec. 60.8 of subpart A of this part, all 
performance tests shall consist of three test runs. The average of the 
particulate matter emission concentrations from the three test runs is 
used to determine compliance.
    (6) In accordance with paragraphs (c)(7) and (c)(11) of this 
section, EPA Reference Method 9 shall be used for determining 
compliance with the opacity limit except as provided under 
Sec. 60.11(e) of subpart A of this part.
    (7) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall conduct an initial 
performance test for particulate matter emissions and opacity as 
required under Sec. 60.8 of subpart A of this part.
    (8) The owner or operator of an affected facility shall install, 
calibrate, maintain, and operate a continuous 

[[Page 65428]]
opacity monitoring system for measuring opacity and shall follow the 
methods and procedures specified in paragraphs (c)(8)(i) through 
(c)(8)(iv) of this section.
    (i) The output of the continuous opacity monitoring system shall be 
recorded on a 6-minute average basis.
    (ii) The continuous opacity monitoring system shall be installed, 
evaluated, and operated in accordance with Sec. 60.13 of subpart A of 
this part.
    (iii) The continuous opacity monitoring system shall conform to 
Performance Specification 1 in appendix B of this part.
    (iv) The initial performance evaluation shall be completed no later 
than 180 days after the date of the initial startup of the municipal 
waste combustor unit, as specified under Sec. 60.8 of subpart A of this 
part.
    (9) Following the date that the initial performance test for 
particulate matter is completed or is required to be completed under 
Sec. 60.8 of subpart A of this part for an affected facility located 
within a large municipal waste combustor plant, the owner or operator 
shall conduct a performance test for particulate matter on an annual 
basis (no more than 12 calendar months following the previous 
performance test).
    (10) Following the date that the initial performance test for 
particulate matter is completed or is required to be completed under 
Sec. 60.8 of subpart A of this part for an affected facility located 
within a small municipal waste combustor plant, the owner or operator 
shall conduct a performance test for particulate matter on an annual 
basis (no more than 12 calendar months following the previous 
performance test). If all performance tests over a 3-year period 
indicate compliance with the particulate matter emission limit, the 
owner or operator may elect not to conduct a performance test for the 
subsequent 2 years. At a minimum, a performance test for particulate 
matter shall be conducted every third year (no more than 36 months 
following the previous performance test) at a small municipal waste 
combustor plant. If a performance test conducted every third year 
indicates compliance with the particulate matter emission limit, the 
owner or operator may elect not to conduct a performance test for an 
additional 2 years. If any performance test indicates noncompliance 
with the particulate matter emission limit, performance tests shall be 
required annually until all annual performance tests over a 3-year 
period indicate compliance with the particulate matter emission limit.
    (11) Following the date that the initial performance test for 
opacity is completed or is required to be completed under Sec. 60.8 of 
subpart A of this part for an affected facility located within a small 
or large municipal waste combustor plant, the owner or operator shall 
conduct a performance test for opacity on an annual basis (no more than 
12 calendar months following the previous performance test) using the 
test method specified in paragraph (c)(6) of this section.
    (d) The procedures and test methods specified in paragraphs (d)(1) 
and (d)(2) of this section shall be used to determine compliance with 
the emission limits for cadmium, lead, and mercury under 
Sec. 60.52b(a).
    (1) The procedures and test methods specified in paragraphs 
(d)(1)(i) through (d)(1)(ix) of this section shall be used to determine 
compliance with the emission limits for cadmium and lead under 
Sec. 60.52b(a) (3) and (4).
    (i) The EPA Reference Method 1 shall be used for determining the 
location and number of sampling points.
    (ii) The EPA Reference Method 3 shall be used for flue gas 
analysis.
    (iii) The EPA Reference Method 29 shall be used for determining 
compliance with the cadmium and lead emission limits.
    (iv) An oxygen or carbon dioxide measurement shall be obtained 
simultaneously with each Method 29 test run for cadmium and lead 
required under paragraph (d)(1)(iii) of this section.
    (v) An owner or operator may request that compliance with the 
cadmium or lead emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (vi) All performance tests shall consist of a minimum of three test 
runs conducted under representative full load operating conditions. The 
average of the cadmium or lead emission concentrations from three test 
runs or more shall be used to determine compliance.
    (vii) Following the date of the initial performance test or the 
date on which the initial performance test is required to be completed 
under Sec. 60.8 of subpart A of this part, the owner or operator of an 
affected facility located within a large municipal waste combustor 
plant shall conduct a performance test for compliance with the emission 
limits for cadmium and lead on an annual basis (no more than 12 
calendar months following the previous performance test).
    (viii) Following the date that the initial performance test for 
cadmium is completed or is required to be completed under Sec. 60.8 of 
subpart A of this part for an affected facility located within a small 
municipal waste combustor plant, the owner or operator shall conduct a 
performance test for cadmium emissions on an annual basis (no more than 
12 calendar months following the previous performance test). If all 
performance tests over a 3-year period indicate compliance with the 
cadmium emission limit, the owner or operator may elect not to conduct 
a performance test for the subsequent 2 years. At a minimum, a 
performance test for cadmium shall be conducted every third year (no 
more than 36 months following the previous performance test) at a small 
municipal waste combustor plant. If a performance test conducted every 
third year indicates compliance with the cadmium emission limit, the 
owner or operator may elect not to conduct a performance test for an 
additional 2 years. If any performance test indicates noncompliance 
with the cadmium emission limit, performance tests shall be conducted 
annually until all annual performance tests over a 3-year period 
indicate compliance with the cadmium emission limit.
    (ix) Following the date that the initial performance test for lead 
is completed or is required to be completed under Sec. 60.8 of subpart 
A of this part for an affected facility located within a small 
municipal waste combustor plant, the owner or operator shall conduct a 
performance test for lead emissions on an annual basis (no more than 12 
calendar months following the previous performance test). If all three 
performance tests over a 3-year period indicate compliance with the 
lead emission limit, the owner or operator may elect not to conduct a 
performance test for the subsequent 2 years. At a minimum, a 
performance test for lead shall be conducted every third year (no more 
than 36 months following the previous performance test) at a small 
municipal waste combustor plant. If a performance test conducted every 
third year indicates compliance with the lead emission limit, the owner 
or operator may elect not to conduct a performance test for an 
additional 2 years. If any performance test indicates noncompliance 
with the lead emission limit, performance tests shall be conducted 
annually until all annual performance tests over a 3-year period 
indicate compliance with the lead emission limit. 

[[Page 65429]]

    (2) The procedures and test methods specified in paragraphs 
(d)(2)(i) through (d)(2)(xi) of this section shall be used to determine 
compliance with the mercury emission limit under Sec. 60.52b(a)(5).
    (i) The EPA Reference Method 1 shall be used for determining the 
location and number of sampling points.
    (ii) The EPA Reference Method 3 shall b
FR Doc. 95-30257 Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources
e used for flue gas 
analysis.
    (iii) The EPA Reference Method 29 shall be used to determine the 
mercury emission concentration. The minimum sample volume when using 
Method 29 for mercury shall be 1.7 cubic meters.
    (iv) An oxygen (or carbon dioxide) measurement shall be obtained 
simultaneously with each Method 29 test run for mercury required under 
paragraph (d)(2)(iii) of this section.
    (v) The percent reduction in the potential mercury emissions (%PHg) 
is computed using equation 1:
[GRAPHIC][TIFF OMITTED]TR19DE95.001

where:

%PHg = percent reduction of the potential mercury emissions 
achieved.
Ei = potential mercury emission concentration measured at the 
control device inlet, corrected to 7 percent oxygen (dry basis).
Eo = controlled mercury emission concentration measured at the 
mercury control device outlet, corrected to 7 percent oxygen (dry 
basis).

    (vi) All performance tests shall consist of a minimum of three test 
runs conducted under representative full load operating conditions. The 
average of the mercury emission concentrations or percent reductions 
from three test runs or more is used to determine compliance.
    (vii) An owner or operator may request that compliance with the 
mercury emission limit be determined using carbon dioxide measurements 
corrected to an equivalent of 7 percent oxygen. The relationship 
between oxygen and carbon dioxide levels for the affected facility 
shall be established as specified in paragraph (b)(6) of this section.
    (viii) The owner or operator of an affected facility located within 
a small or large municipal waste combustor plant shall conduct an 
initial performance test for mercury emissions as required under 
Sec. 60.8 of subpart A of this part.
    (ix) Following the date that the initial performance test for 
mercury is completed or is required to be completed under Sec. 60.8 of 
subpart A of this part, the owner or operator of an affected facility 
located within a large municipal waste combustor plant shall conduct a 
performance test for mercury emissions on a annual basis (no more than 
12 calendar months from the previous performance test).
    (x) Following the date that the initial performance test for 
mercury is completed or is required to be completed under Sec. 60.8 of 
subpart A of this part for an affected facility located within a small 
municipal waste combustor plant, the owner or operator shall conduct a 
performance test for mercury emissions on an annual basis (no more than 
12 calendar months following the previous performance test). If all 
three performance tests over a 3-year period indicate compliance with 
the mercury emission limit, the owner or operator may elect not to 
conduct a performance test for the subsequent 2 years. At a minimum, a 
performance test for mercury shall be conducted every third year (no 
more than 36 months following the previous performance test) at a small 
municipal waste combustor plant. If a performance test conducted every 
third year indicates compliance with the mercury emission limit, the 
owner or operator may elect not to conduct a performance test for an 
additional 2 years. If any performance test indicates noncompliance 
with the mercury emission limit, performance tests shall be conducted 
annually until all annual performance tests over a 3-year period 
indicate compliance with the mercury emission limit.
    (xi) The owner or operator of an affected facility where activated 
carbon injection is used to comply with the mercury emission limit 
shall follow the procedures specified in paragraph (m) of this section 
for measuring and calculating carbon usage.
    (e) The procedures and test methods specified in paragraphs (e)(1) 
through (e)(14) of this section shall be used for determining 
compliance with the sulfur dioxide emission limit under 
Sec. 60.52b(b)(1).
    (1) The EPA Reference Method 19, section 4.3, shall be used to 
calculate the daily geometric average sulfur dioxide emission 
concentration.
    (2) The EPA Reference Method 19, section 5.4, shall be used to 
determine the daily geometric average percent reduction in the 
potential sulfur dioxide emission concentration.
    (3) An owner or operator may request that compliance with the 
sulfur dioxide emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (4) The owner or operator of an affected facility shall conduct an 
initial performance test for sulfur dioxide emissions as required under 
Sec. 60.8 of subpart A of this part. Compliance with the sulfur dioxide 
emission limit (concentration or percent reduction) shall be determined 
by using the continuous emission monitoring system specified in 
paragraph (e)(5) of this section to measure sulfur dioxide and 
calculating a 24-hour daily geometric average emission concentration or 
a 24-hour daily geometric average percent reduction using EPA Reference 
Method 19, sections 4.3 and 5.4, as applicable.
    (5) The owner or operator of an affected facility shall install, 
calibrate, maintain, and operate a continuous emission monitoring 
system for measuring sulfur dioxide emissions discharged to the 
atmosphere and record the output of the system.
    (6) Following the date that the initial performance test for sulfur 
dioxide is completed or is required to be completed under Sec. 60.8 of 
subpart A of this part, compliance with the sulfur dioxide emission 
limit shall be determined based on the 24-hour daily geometric average 
of the hourly arithmetic average emission concentrations using 
continuous emission monitoring system outlet data if compliance is 
based on an emission concentration, or continuous emission monitoring 
system inlet and outlet data if compliance is based on a percent 
reduction.
    (7) At a minimum, valid continuous monitoring system hourly 
averages shall be obtained as specified in paragraphs (e)(7)(i) and 
(e)(7)(ii) for 75 percent of the operating hours per day for 90 percent 
of the operating days per calendar quarter that the affected facility 
is combusting municipal solid waste.
    (i) At least two data points per hour shall be used to calculate 
each 1-hour arithmetic average.
    (ii) Each sulfur dioxide 1-hour arithmetic average shall be 
corrected to 7 percent oxygen on an hourly basis using the 1-hour 
arithmetic average of the oxygen (or carbon dioxide) continuous 
emission monitoring system data.
    (8) The 1-hour arithmetic averages required under paragraph (e)(6) 
of this section shall be expressed in parts per million corrected to 7 
percent oxygen (dry basis) and used to calculate the 24-hour daily 
geometric average emission concentrations and daily geometric average 
emission percent reductions. The 1-hour arithmetic averages shall be 
calculated using the data points 

[[Page 65430]]
required under Sec. 60.13(e)(2) of subpart A of this part.
    (9) All valid continuous emission monitoring system data shall be 
used in calculating average emission concentrations and percent 
reductions even if the minimum continuous emission monitoring system 
data requirements of paragraph (e)(7) of this section are not met.
    (10) The procedures under Sec. 60.13 of subpart A of this part 
shall be followed for installation, evaluation, and operation of the 
continuous emission monitoring system.
    (11) The initial performance evaluation shall be completed no later 
than 180 days after the date of initial startup of the municipal waste 
combustor as specified under Sec. 60.8 of subpart A of this part.
    (12) The continuous emission monitoring system shall be operated 
according to Performance Specification 2 in appendix B of this part.
    (i) During each relative accuracy test run of the continuous 
emission monitoring system required by Performance Specification 2 in 
appendix B of this part, sulfur dioxide and oxygen (or carbon dioxide) 
data shall be collected concurrently (or within a 30- to 60-minute 
period) by both the continuous emission monitors and the test methods 
specified in paragraphs (e)(12)(i)(A) and (e)(12)(i)(B) of this 
section.
    (A) For sulfur dioxide, EPA Reference Method 6, 6A, or 6C shall be 
used.
    (B) For oxygen (or carbon dioxide), EPA Reference Method 3A or 3B 
shall be used.
    (ii) The span value of the continuous emissions monitoring system 
at the inlet to the sulfur dioxide control device shall be 125 percent 
of the maximum estimated hourly potential sulfur dioxide emissions of 
the municipal waste combustor unit. The span value of the continuous 
emission monitoring system at the outlet of the sulfur dioxide control 
device shall be 50 percent of the maximum estimated hourly potential 
sulfur dioxide emissions of the municipal waste combustor unit.
    (13) Quarterly accuracy determinations and daily calibration drift 
tests shall be performed in accordance with procedure 1 in appendix F 
of this part.
    (14) When sulfur dioxide emissions data are not obtained because of 
continuous emission monitoring system breakdowns, repairs, calibration 
checks, and zero and span adjustments, emissions data shall be obtained 
by using other monitoring systems as approved by the Administrator or 
EPA Reference Method 19 to provide, as necessary, valid emissions data 
for a minimum of 75 percent of the hours per day that the affected 
facility is operated and combusting municipal solid waste for 90 
percent of the days per calendar quarter that the affected facility is 
operated and combusting municipal solid waste.
    (f) The procedures and test methods specified in paragraphs (f)(1) 
through (f)(8) of this section shall be used for determining compliance 
with the hydrogen chloride emission limit under Sec. 60.52b(b)(2).
    (1) The EPA Reference Method 26 or 26A, as applicable, shall be 
used to determine the hydrogen chloride emission concentration. The 
minimum sampling time for Method 26 shall be 1 hour.
    (2) An oxygen (or carbon dioxide) measurement shall be obtained 
simultaneously with each Method 26 test run for hydrogen chloride 
required by paragraph (f)(1) of this section.
    (3) The percent reduction in potential hydrogen chloride emissions 
(% PHCl) is computed using equation 2:
[GRAPHIC][TIFF OMITTED]TR19DE95.002

where:

%PHCl=percent reduction of the potential hydrogen chloride 
emissions achieved.
Ei=potential hydrogen chloride emission concentration measured 
at the control device inlet, corrected to 7 percent oxygen (dry 
basis).

Eo=controlled hydrogen chloride emission concentration measured 
at the control device outlet, corrected to 7 percent oxygen (dry 
basis).
    (4) An owner or operator may request that compliance with the 
hydrogen chloride emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (5) As specified under Sec. 60.8 of subpart A of this part, all 
performance tests shall consist of three test runs. The average of the 
hydrogen chloride emission concentrations or percent reductions from 
the three test runs is used to determine compliance.
    (6) The owner or operator of an affected facility shall conduct an 
initial performance test for hydrogen chloride as required under 
Sec. 60.8 of subpart A of this part.
    (7) Following the date that the initial performance test for 
hydrogen chloride is completed or is required to be completed under 
Sec. 60.8 of subpart A of this part, the owner or operator of an 
affected facility located within a large municipal waste combustor 
plant shall conduct a performance test for hydrogen chloride emissions 
on an annual basis (no more than 12 calendar months following the 
previous performance test).
    (8) Following the date that the initial performance test for 
hydrogen chloride is completed or is required to be completed under 
Sec. 60.8 of this part, the owner or operator of an affected facility 
located within a small municipal waste combustor plant shall conduct a 
performance test for hydrogen chloride emissions on an annual basis (no 
more than 12 calendar months following the previous performance test). 
If all performance tests over a 3-year period indicate compliance with 
the hydrogen chloride emission limit, the owner or operator may elect 
not to conduct a performance test for the subsequent 2 years. At a 
minimum, a performance test for hydrogen chloride shall be conducted 
every third year (no more than 36 months following the previous 
performance test) at a small municipal waste combustor plant. If a 
performance test conducted every third year indicates compliance with 
the hydrogen chloride emission limit, the owner or operator may elect 
not to conduct a performance test for an additional 2 years. If any 
performance test indicates noncompliance with the hydrogen chloride 
emission limit, performance tests shall be conducted annually until all 
annual performance tests over a 3-year period indicate compliance with 
the hydrogen chloride emission limit.
    (g) The procedures and test methods specified in paragraphs (g)(1) 
through (g)(9) of this section shall be used to determine compliance 
with the limits for dioxin/furan emissions under Sec. 60.52b(c).
    (1) The EPA Reference Method 1 shall be used for determining the 
location and number of sampling points.
    (2) The EPA Reference Method 3 shall be used for flue gas analysis.
    (3) The EPA Reference Method 23 shall be used for determining the 
dioxin/furan emission concentration.
    (i) The minimum sample time shall be 4 hours per test run.
    (ii) An oxygen (or carbon dioxide) measurement shall be obtained 
simultaneously with each Method 23 test run for dioxins/furans.
    (4) The owner or operator of an affected facility shall conduct an 
initial performance test for dioxin/furan emissions in accordance with 
paragraph (g)(3) of this section, as required under Sec. 60.8 of 
subpart A of this part. 

[[Page 65431]]

    (5) Following the date that the initial performance test for 
dioxins/furans is completed or is required to be completed under 
Sec. 60.8 of subpart A of this part, the owner or operator of an 
affected facility located within small and large municipal waste 
combustor plants shall conduct performance tests for dioxin/furan 
emissions in accordance with paragraph (g)(3) of this section, 
according to one of the schedules specified in paragraphs (g)(5)(i) 
through (g)(5)(iii) of this section.
    (i) For affected facilities located within small and large 
municipal waste combustor plants, performance tests shall be conducted 
on an annual basis (no more than 12 calendar months following the 
previous performance test.)
    (ii) For affected facilities located within small municipal waste 
combustor plants where all performance tests for an affected facility 
over a 3-year period indicate compliance with the dioxin/furan emission 
limit, the owner or operator may elect not to conduct a performance 
test for the subsequent 2 years for that affected facility. At a 
minimum, a performance test for dioxin/furan emissions shall be 
conducted every third year (no more than 36 months following the 
previous performance test) for each affected facility. If a performance 
test conducted every third year indicates compliance with the dioxin/
furan emission limit, the owner or operator may elect not to conduct a 
performance test on the affected facility for an additional 2 years. If 
any performance test indicates noncompliance with the dioxin/furan 
emission limit, performance tests shall be conducted annually until all 
annual performance tests for the affected facility over a 3-year period 
indicate compliance with the dioxin/furan emission limit.
    (iii) For affected facilities located within small or large 
municipal waste combustor plants where all performance tests for all 
affected facilities over a 2-year period indicate that dioxin/furan 
emissions are less than or equal to 7 nanograms per dry standard cubic 
meter (total mass) for all affected facilities located within a 
municipal waste combustor plant, the owner or operator of the municipal 
waste combustor plant may elect to conduct annual performance tests for 
one affected facility (i.e., unit) per year at the municipal waste 
combustor plant. At a minimum, a performance test for dioxin/furan 
emissions shall be conducted annually (no more than 12 months following 
the previous performance test) for one affected facility at the 
municipal waste combustor plant. Each year a different affected 
facility at the municipal waste combustor plant shall be tested, and 
the affected facilities at the plant shall be tested in sequence (e.g., 
unit 1, unit 2, unit 3, as applicable). If each annual performance test 
continues to indicate a dioxin/furan emission level less than or equal 
to 7 nanograms per dry standard cubic meter (total mass), the owner or 
operator may continue conducting a performance test on only one 
affected facility per year. If any annual performance test indicates a 
dioxin/furan emission level greater than 7 nanograms per dry standard 
cubic meter (total mass), performance tests thereafter shall be 
conducted annually on all affected facilities at the plant until and 
unless all annual performance tests for all affected facilities at the 
plant over a 2-year period indicate a dioxin/furan emission level less 
than or equal to 7 nanograms per dry standard cubic meter (total mass).
    (6) The owner or operator of an affected facility that selects to 
follow the performance testing schedule specified in paragraph 
(g)(5)(iii) of this section shall follow the procedures specified in 
Sec. 60.59b(g)(4) for reporting the selection of this schedule.
    (7) The owner or operator of an affected facility where activated 
carbon is used to comply with the dioxin/furan emission limits 
specified in Sec. 60.52b(c) or the dioxin/furan emission level 
specified in paragraph (g)(5)(iii) of this section shall follow the 
procedures specified in paragraph (m) of this section for measuring and 
calculating the carbon usage rate.
    (8) An owner or operator may request that compliance with the 
dioxin/furan emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (9) As specified under Sec. 60.8 of subpart A of this part, all 
performance tests shall consist of three test runs. The average of the 
dioxin/furan emission concentrations from the three test runs is used 
to determine compliance.
    (h) The procedures and test methods specified in paragraphs (h)(1) 
through (h)(12) of this section shall be used to determine compliance 
with the nitrogen oxides emission limit for municipal waste combustors 
located at large municipal waste combustor plants under Sec. 60.52b(d) 
(no nitrogen oxides performance tests are required for affected 
facilities located within small municipal waste combustor plants).
    (1) The EPA Reference Method 19, section 4.1, shall be used for 
determining the daily arithmetic average nitrogen oxides emission 
concentration.
    (2) An owner or operator may request that compliance with the 
nitrogen oxides emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (3) The owner or operator of an affected facility located within a 
large municipal waste combustor plant subject to the nitrogen oxides 
limit under Sec. 60.52b(d) shall conduct an initial performance test 
for nitrogen oxides as required under Sec. 60.8 of subpart A of this 
part. Compliance with the nitrogen oxides emission limit shall be 
determined by using the continuous emission monitoring system specified 
in paragraph (h)(4) of this section for measuring nitrogen oxides and 
calculating a 24-hour daily arithmetic average emission concentration 
using EPA Reference Method 19, section 4.1.
    (4) The owner or operator of an affected facility located within a 
large municipal waste combustor plant subject to the nitrogen oxides 
emission limit under Sec. 60.52b(d) shall install, calibrate, maintain, 
and operate a continuous emission monitoring system for measuring 
nitrogen oxides discharged to the atmosphere, and record the output of 
the system.
    (5) Following the date that the initial performance test for 
nitrogen oxides is completed or is required to be completed under 
Sec. 60.8 of subpart A of this part, compliance with the emission limit 
for nitrogen oxides required under Sec. 60.52b(d) shall be determined 
based on the 24-hour daily arithmetic average of the hourly emission 
concentrations using continuous emission monitoring system outlet data.
    (6) At a minimum, valid continuous emission monitoring system 
hourly averages shall be obtained as specified in paragraphs (h)(6)(i) 
and (h)(6)(ii) of this section for 75 percent of the operating hours 
per day for 90 percent of the operating days per calendar quarter that 
the affected facility is combusting municipal solid waste.
    (i) At least 2 data points per hour shall be used to calculate each 
1-hour arithmetic average.
    (ii) Each nitrogen oxides 1-hour arithmetic average shall be 
corrected to 7 percent oxygen on an hourly basis using the 1-hour 
arithmetic average of the oxygen (or carbon dioxide) 

[[Page 65432]]
continuous emission monitoring system data.
    (7) The 1-hour arithmetic averages required by paragraph (h)(5) of 
this section shall be expressed in parts per million by volume (dry 
basis) and used to calculate the 24-hour daily arithmetic average 
concentrations. The 1-hour arithmetic averages shall be calculated 
using the data points required under Sec. 60.13(e)(2) of subpart A of 
this part.
    (8) All valid continuous emission monitoring system data must be 
used in calculating emission averages even if the minimum continuous 
emission monitoring system data requirements of paragraph (h)(6) of 
this section are not met.
    (9) The procedures under Sec. 60.13 of subpart A of this part shall 
be followed for installation, evaluation, and operation of the 
continuous emission monitoring system. The initial performance 
evaluation shall be completed no later than 180 days after the date of 
initial startup of the municipal waste combustor unit, as specified 
under Sec. 60.8 of subpart A of this part.
    (10) The owner or operator shall operate the continuous emission 
monitoring system according to Performance Specification 2 in appendix 
B of this part and shall follow the procedures and methods specified in 
paragraphs (h)(10)(i) and (h)(10)(ii) of this section.
    (i) During each relative accuracy test run of the continuous 
emission monitoring system required by Performance Specification 2 of 
appendix B of this part, nitrogen oxides and oxygen (or carbon dioxide) 
data shall be collected concurrently (or within a 30- to 60-minute 
period) by both the continuous emission monitors and the test methods 
specified in paragraphs (h)(10)(i)(A) and (h)(10)(i)(B) of this 
section.
    (A) For nitrogen oxides, EPA Reference Method 7, 7A, 7C, 7D, or 7E 
shall be used.
    (B) For oxygen (or carbon dioxide), EPA Reference Method 3A or 3B 
shall be used.
    (ii) The span value of the continuous emission monitoring system 
shall be 125 percent of the maximum estimated hourly potential nitrogen 
oxide emissions of the municipal waste combustor unit.
    (11) Quarterly accuracy determinations and daily calibration drift 
tests shall be performed in accordance with procedure 1 in appendix F 
of this part.
    (12) When nitrogen oxides continuous emissions data are not 
obtained because of continuous emission monitoring system breakdowns, 
repairs, calibration checks, and zero and span adjustments, emissions 
data shall be obtained using other monitoring systems as approved by 
the Administrator or EPA Reference Method 19 to provide, as necessary, 
valid emissions data for a minimum of 75 percent of the hours per day 
for 90 percent of the days per calendar quarter the unit is operated 
and combusting municipal solid waste.
    (i) The procedures specified in paragraphs (i)(1) through (i)(12) 
of this section shall be used for determining compliance with the 
operating requirements under Sec. 60.53b.
    (1) Compliance with the carbon monoxide emission limits in 
Sec. 60.53b(a) shall be determined using a 4-hour block arithmetic 
average for all types of affected facilities except mass burn rotary 
waterwall municipal waste combustors and refuse-derived fuel stokers.
    (2) For affected mass burn rotary waterwall municipal waste 
combustors and refuse-derived fuel stokers, compliance with the carbon 
monoxide emission limits in Sec. 60.53b(a) shall be determined using a 
24-hour daily arithmetic average.
    (3) The owner or operator of an affected facility shall install, 
calibrate, maintain, and operate a continuous emission monitoring 
system for measuring carbon monoxide at the combustor outlet and record 
the output of the system and shall follow the procedures and methods 
specified in paragraphs (i)(3)(i) through (i)(3)(iii) of this section.
    (i) The continuous emission monitoring system shall be operated 
according to Performance Specification 4A in appendix B of this part.
    (ii) During each relative accuracy test run of the continuous 
emission monitoring system required by Performance Specification 4A in 
appendix B of this part, carbon monoxide and oxygen (or carbon dioxide) 
data shall be collected concurrently (or within a 30- to 60-minute 
period) by both the continuous emission monitors and the test methods 
specified in paragraphs (i)(3)(ii)(A) and (i)(3)(ii)(B) of this 
section.
    (A) For carbon monoxide, EPA Reference Method 10, 10A, or 10B shall 
be used.
    (B) For oxygen (or carbon dioxide), EPA Reference Method 3A or 3B 
shall be used.
    (iii) The span value of the continuous emission monitoring system 
shall be 125 percent of the maximum estimated hourly potential carbon 
monoxide emissions of the municipal waste combustor unit.
    (4) The 4-hour block and 24-hour daily arithmetic averages 
specified in paragraphs (i)(1) and (i)(2) of this section shall be 
calculated from 1-hour arithmetic averages expressed in parts per 
million by volume corrected to 7 percent oxygen (dry basis). The 1-hour 
arithmetic averages shall be calculated using the data points generated 
by the continuous emission monitoring system. At least two data points 
shall be used to calculate each 1-hour arithmetic average.
    (5) An owner or operator may request that compliance with the 
carbon monoxide emission limit be determined using carbon dioxide 
measurements corrected to an equivalent of 7 percent oxygen. The 
relationship between oxygen and carbon dioxide levels for the affected 
facility shall be established as specified in paragraph (b)(6) of this 
section.
    (6) The procedures specified in paragraphs (i)(6)(i) through 
(i)(6)(v) of this section shall be used to determine compliance with 
load level requirements under Sec. 60.53b(b).
    (i) The owner or operator of an affected facility with steam 
generation capability shall install, calibrate, maintain, and operate a 
steam flow meter or a feedwater flow meter; measure steam (or 
feedwater) flow in kilograms per hour (or pounds per hour) on a 
continuous basis; and record the output of the monitor. Steam (or 
feedwater) flow shall be calculated in 4-hour block arithmetic 
averages.
    (ii) The method included in the ``American Society of Mechanical 
Engineers Power Test Codes: Test Code for Steam Generating Units, Power 
Test Code 4.1--1964 (R1991)'' section 4 (incorporated by reference, see 
Sec. 60.17 of subpart A of this part) shall be used for calculating the 
steam (or feedwater) flow required under paragraph (i)(6)(i) of this 
section. The recommendations in ``American Society of Mechanical 
Engineers Interim Supplement 19.5 on Instruments and Apparatus: 
Application, Part II of Fluid Meters, 6th edition (1971),'' chapter 4 
(incorporated by reference--see Sec. 60.17 of subpart A of this part) 
shall be followed for design, construction, installation, calibration, 
and use of nozzles and orifices except as specified in (i)(6)(iii) of 
this section.
    (iii) Measurement devices such as flow nozzles and orifices are not 
required to be recalibrated after they are installed.
    (iv) All signal conversion elements associated with steam (or 
feedwater flow) measurements must be calibrated according to the 
manufacturer's instructions before each dioxin/furan 

[[Page 65433]]
performance test, and at least once per year.
    (a) [Reserved].
    (7) To determine compliance with the maximum particulate matter 
control device temperature requirements under Sec. 60.53b(c), the owner 
or operator of an affected facility shall install, calibrate, maintain, 
and operate a device for measuring on a continuous basis the 
temperature of the flue gas stream at the inlet to each particulate 
matter control device utilized by the affected facility. Temperature 
shall be calculated in 4-hour block arithmetic averages.
    (8) The maximum demonstrated municipal waste combustor unit load 
shall be determined during the initial performance test for dioxins/
furans and each subsequent performance test during which compliance 
with the dioxin/furan emission limit specified in Sec. 60.52b(c) is 
achieved. The maximum demonstrated municipal waste combustor unit load 
shall be the highest 4-hour arithmetic average load achieved during 
four consecutive hours during the most recent test during which 
compliance with the dioxin/furan emission limit was achieved.
    (9) For each particulate matter control device employed at the 
affected facility, the maximum demonstrated particulate matter control 
device temperature shall be determined during the initial performance 
test for dioxins/furans and each subsequent performance test during 
which compliance with the dioxin/furan emission limit specified in 
Sec. 60.52b(c) is achieved. The maximum demonstrated particulate matter 
control device temperature shall be the highest 4-hour arithmetic 
average temperature achieved at the particulate matter control device 
inlet during four consecutive hours during the most recent test during 
which compliance with the dioxin/furan limit was achieved.
    (10) At a minimum, valid continuous emission monitoring system 
hourly averages shall be obtained as specified in paragraphs (i)(10)(i) 
and (i)(10)(ii) of this section for 75 percent of the operating hours 
per day for 90 percent of the operating days per calendar quarter that 
the affected facility is combusting municipal solid waste.
    (i) At least two data points per hour shall be used to calculate 
each 1-hour arithmetic average.
    (ii) At a minimum, each carbon monoxide 1-hour arithmetic average 
shall be corrected to 7 percent oxygen on an hourly basis using the 1-
hour arithmetic average of the oxygen (or carbon dioxide) continuous 
emission monitoring system data.
    (11) All valid continuous emission monitoring system data must be 
used in calculating the parameters specified under paragraph (i) of 
this section even if the minimum data requirements of paragraph (i)(10) 
of this section are not met. When carbon monoxide continuous emission 
data are not obtained because of continuous emission monitoring system 
breakdowns, repairs, calibration checks, and zero and span adjustments, 
emissions data shall be obtained using other monitoring systems as 
approved by the Administrator or EPA Reference Method 10 to provide, as 
necessary, the minimum valid emission data.
    (12) Quarterly accuracy determinations and daily calibration drift 
tests for the carbon monoxide continuous emission monitoring system 
shall be performed in accordance with procedure 1 in appendix F of this 
part.
    (j) The procedures specified in paragraphs (j)(1) and (j)(2) of 
this section shall be used for calculating municipal waste combustor 
unit capacity as defined under Sec. 60.51b.
    (1) For municipal waste combustor units capable of combusting 
municipal solid waste continuously for a 24-hour period, municipal 
waste combustor unit capacity, in megagrams per day of municipal solid 
waste combusted, shall be calculated based on 24 hours of operation at 
the maximum charging rate. The maximum charging rate shall be 
determined as specified in paragraphs (j)(1)(i) and (j)(1)(ii) of this 
section as applicable.
    (i) For combustors that are designed based on heat capacity, the 
maximum charging rate shall be calculated based on the maximum design 
heat input capacity of the unit and a heating value of 10,500 
kilojoules per kilogram.
    (ii) For combustors that are not designed based on heat capacity, 
the maximum charging rate shall be the maximum design charging rate.
    (2) For batch feed municipal waste combustor units, municipal waste 
combustor unit capacity, in megagrams per day of municipal solid waste 
combusted, shall be calculated as the maximum design amount of 
municipal solid waste that can be charged per batch multiplied by the 
maximum number of batches that could be processed in a 24-hour period. 
The maximum number of batches that could be processed in a 24-hour 
period is calculated as 24 hours divided by the design number of hours 
required to process one batch of municipal solid waste, and may include 
fractional batches (e.g., if one batch requires 16 hours, then 24/16, 
or 1.5 batches, could be combusted in a 24-hour period). For batch 
combustors that are designed based on heat capacity, the design heating 
value of 10,500 kilojoules per kilogram for all municipal solid waste 
shall be used in calculating the municipal waste combustor unit 
capacity in megagrams per day of municipal solid waste.
    (k) The procedures specified in paragraphs (k)(1) through (k)(3) of 
this section shall be used for determining compliance with the fugitive 
ash emission limit under Sec. 60.55b.
    (1) The EPA Reference Method 22 shall be used for determining 
compliance with the fugitive ash emission limit under Sec. 60.55b. The 
minimum observation time shall be a series of three 1-hour 
observations. The observation period shall include times when the 
facility is transferring ash from the municipal waste combustor unit to 
the area where ash is stored or loaded into containers or trucks.
    (2) The average duration of visible emissions per hour shall be 
calculated from the three 1-hour observations. The average shall be 
used to determine compliance with Sec. 60.55b.
    (3) The owner or operator of an affected facility shall conduct an 
initial performance test for fugitive ash emissions as required under 
Sec. 60.8 of subpart A of this part.
    (l) The procedures specified in paragraphs (l)(1) through (l)(3) of 
this section shall be used to determine compliance with the opacity 
limit for air curtain incinerators under Sec. 60.56b.
    (1) The EPA Reference Method 9 shall be used for determining 
compliance with the opacity limit.
    (2) The owner or operator of the air curtain incinerator shall 
conduct an initial performance test for opacity as required under 
Sec. 60.8 of subpart A of this part.
    (3) Following the date that the initial performance test is 
completed or is required to be completed under Sec. 60.8 of subpart A 
of this part, the owner or operator of the air curtain incinerator 
shall conduct a performance test for opacity on an annual basis (no 
more than 12 calendar months following the previous performance test).
    (m) The owner or operator of an affected facility where activated 
carbon injection is used to comply with the mercury emission limit 
under Sec. 60.52b(a)(5), or the dioxin/furan emission limits under 
Sec. 60.52(b)(c), or the dioxin/furan emission level specified in 
Sec. 60.58b(g)(5)(iii) shall follow the procedures specified in 
paragraphs (m)(1) through (m)(3) of this section.
    (1) During the performance tests for dioxins/furans and mercury, as 

[[Page 65434]]
applicable, the owner or operator shall estimate an average carbon mass 
feed rate based on carbon injection system operating parameters such as 
the screw feeder speed, hopper volume, hopper refill frequency, or 
other parameters appropriate to the feed system being employed, as 
specified in paragraphs (m)(1)(i) and (m)(1)(ii) of this section.
    (i) An average carbon mass feed rate in kilograms per hour or 
pounds per hour shall be estimated during the initial performance test 
for mercury emissions and each subsequent performance test for mercury 
emissions.
    (ii) An average carbon mass feed rate in kilograms per hour or 
pounds per hour shall be estimated during the initial performance test 
for dioxin/furan emissions and each subsequent performance test for 
dioxin/furan emissions.
    (2) During operation of the affected facility, the carbon injection 
system operating parameter(s) that are the primary indicator(s) of the 
carbon mass feed rate (e.g., screw feeder setting) must equal or exceed 
the level(s) documented during the performance tests specified under 
paragraphs (m)(1)(i) and (m)(1)(ii) of this section.
    (3) The owner or operator shall estimate the total carbon usage of 
the plant (kilograms or pounds) for each calendar quarter by two 
independent methods, according to the procedures in paragraphs 
(m)(3)(i) and (m)(3)(ii) of this section.
    (i) The weight of carbon delivered to the plant.
    (ii) Estimate the average carbon mass feed rate in kilograms per 
hour or pounds per hour for each hour of operation for each affected 
facility based on the parameters specified under paragraph (m)(1) of 
this section, and sum the results for all affected facilities at the 
plant for the total number of hours of operation during the calendar 
quarter.

Sec. 60.59b  Reporting and recordkeeping requirements.

    (a) The owner or operator of an affected facility located at a 
municipal waste combustor plant with a capacity to combust greater than 
35 megagrams per day shall submit, on or before the date the 
application for a construction permit is submitted under 40 CFR part 
51, subpart I, or part 52, as applicable, the items specified in 
paragraphs (a)(1) through (a)(4) of this section.
    (1) The preliminary and final draft materials separation plans 
required by Sec. 60.57b(a)(1) and (a)(5).
    (2) A copy of the notification of the public meeting required by 
Sec. 60.57b(a)(1)(ii).
    (3) A transcript of the public meeting required by 
Sec. 60.57b(a)(2).
    (4) A copy of the document summarizing responses to public comments 
required by Sec. 60.57b(a)(3).
    (b) The owner or operator of an affected facility located at a 
municipal waste combustor plant with a capacity to combust greater than 
35 megagrams per day shall submit a notification of construction, which 
includes the information specified in paragraphs (b)(1) through (b)(5) 
of this section.
    (1) Intent to construct.
    (2) Planned initial startup date.
    (3) The types of fuels that the owner or operator plans to combust 
in the affected facility.
    (4) The municipal waste combustor unit capacity, municipal waste 
combustor plant capacity, and supporting capacity calculations prepared 
in accordance with Sec. 60.58b(j).
    (5) Documents associated with the siting requirements under 
Sec. 60.57b (a) and (b), as specified in paragraphs (b)(5)(i) through 
(b)(5)(v) of this section.
    (i) The siting analysis required by Sec. 60.57b (b)(1) and (b)(2).
    (ii) The final materials separation plan for the affected facility 
required by Sec. 60.57b(a)(10).
    (iii) A copy of the notification of the public meeting required by 
Sec. 60.57b(b)(3)(ii).
    (iv) A transcript of the public meeting required by 
Sec. 60.57b(b)(4).
    (v) A copy of the document summarizing responses to public comments 
required by Sec. 60.57b (a)(9) and (b)(5).
    (c) The owner or operator of an air curtain incinerator subject to 
the opacity limit under Sec. 60.56b shall provide a notification of 
construction that includes the information specified in paragraphs 
(b)(1) through (b)(4) of this section.
    (d) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant and subject to the 
standards under Secs. 60.52b, 60.53b, 60.54b, 60.55b, and 60.57b shall 
maintain records of the information specified in paragraphs (d)(1) 
through (d)(15) of this section, as applicable, for each affected 
facility for a period of at least 5 years.
    (1) The calendar date of each record.
    (2) The emission concentrations and parameters measured using 
continuous monitoring systems as specified under paragraphs (d)(2)(i) 
and (d)(2)(ii) of this section.
    (i) The measurements specified in paragraphs (d)(2)(i)(A) through 
(d)(2)(i)(D) of this section shall be recorded and be available for 
submittal to the Administrator or review onsite by an inspector.
    (A) All 6-minute average opacity levels as specified under 
Sec. 60.58b(c).
    (B) All 1-hour average sulfur dioxide emission concentrations as 
specified under Sec. 60.58b(e).
    (C) All 1-hour average nitrogen oxides emission concentrations as 
specified under Sec. 60.58b(h) (large municipal waste combustor plants 
only).
    (D) All 1-hour average carbon monoxide emission concentrations, 
municipal waste combustor unit load measurements, and particulate 
matter control device inlet temperatures as specified under 
Sec. 60.58b(i).
    (ii) The average concentrations and percent reductions, as 
applicable, specified in paragraphs (d)(2)(ii)(A) through (d)(2)(ii)(D) 
of this section shall be computed and recorded, and shall be available 
for submittal to the Administrator or review on-site by an inspector.
    (A) All 24-hour daily geometric average sulfur dioxide emission 
concentrations and all 24-hour daily geometric average percent 
reductions in sulfur dioxide emissions as specified under 
Sec. 60.58b(e).
    (B) All 24-hour daily arithmetic average nitrogen oxides emission 
concentrations as specified under Sec. 60.58b(h) (large municipal waste 
combustor plants only).
    (C) All 4-hour block or 24-hour daily arithmetic average carbon 
monoxide emission concentrations, as applicable, as specified under 
Sec. 60.58b(i).
    (D) All 4-hour block arithmetic average municipal waste combustor 
unit load levels and particulate matter control device inlet 
temperatures as specified under Sec. 60.58b(i).
    (3) Identification of the calendar dates when any of the average 
emission concentrations, percent reductions, or operating parameters 
recorded under paragraphs (d)(2)(ii)(A) through (d)(2)(ii)(E) of this 
section, or the opacity levels recorded under paragraph (d)(2)(i)(A) of 
this section are above the applicable limits, with reasons for such 
exceedances and a description of corrective actions taken.
    (4) For affected facilities that apply activated carbon for mercury 
or dioxin/furan control, the records specified in paragraphs (d)(4)(i) 
through (d)(4)(v) of this section.
    (i) The average carbon mass feed rate (in kilograms per hour or 
pounds per hour) estimated as required under Sec. 60.58b(m)(1)(i) of 
this section during the initial mercury performance test and all 
subsequent annual performance tests, with supporting calculations.
    (ii) The average carbon mass feed rate (in kilograms per hour or 
pounds per hour) estimated as required under 

[[Page 65435]]
Sec. 60.58b(m)(1)(ii) of this section during the initial dioxin/furan 
performance test and all subsequent annual performance tests, with 
supporting calculations.
    (iii) The average carbon mass feed rate (in kilograms per hour or 
pounds per hour) estimated for each hour of operation as required under 
Sec. 60.58b(m)(3)(ii) of this section, with supporting calculations.
    (iv) The total carbon usage for each calendar quarter estimated as 
specified by paragraph 60.58b(m)(3) of this section, with supporting 
calculations.
    (v) Carbon injection system operating parameter data for the 
parameter(s) that are the primary indicator(s) of carbon feed rate 
(e.g., screw feeder speed).
    (5) [Reserved]
    (6) Identification of the calendar dates for which the minimum 
number of hours of any of the data specified in paragraphs (d)(6)(i) 
through (d)(6)(v) of this section have not been obtained including 
reasons for not obtaining sufficient data and a description of 
corrective actions taken.
    (i) Sulfur dioxide emissions data;
    (ii) Nitrogen oxides emissions data (large municipal waste 
combustor plants only);
    (iii) Carbon monoxide emissions data;
    (iv) Municipal waste combustor unit load data; and
    (v) Particulate matter control device temperature data.
    (7) Identification of each occurrence that sulfur dioxide emissions 
data, nitrogen oxides emissions data (large municipal waste combustors 
only), or operational data (i.e., carbon monoxide emissions, unit load, 
and particulate matter control device temperature) have been excluded 
from the calculation of average emission concentrations or parameters, 
and the reasons for excluding the data.
    (8) The results of daily drift tests and quarterly accuracy 
determinations for sulfur dioxide, nitrogen oxides (large municipal 
waste combustors only), and carbon monoxide continuous emission 
monitoring systems, as required under appendix F of this part, 
procedure 1.
    (9) The test reports documenting the results of the initial 
performance test and all annual performance tests listed in paragraphs 
(d)(9)(i) and (d)(9)(ii) of this section shall be recorded along with 
supporting calculations.
    (i) The results of the initial performance test and all annual 
performance tests conducted to determine compliance with the 
particulate matter, opacity, cadmium, lead, mercury, dioxins/furans, 
hydrogen chloride, and fugitive ash emission limits.
    (ii) For the initial dioxin/furan performance test and all 
subsequent dioxin/furan performance tests recorded under paragraph 
(d)(9)(i) of this section, the maximum demonstrated municipal waste 
combustor unit load and maximum demonstrated particulate matter control 
device temperature (for each particulate matter control device).
    (10) [Reserved]
    (11) For each municipal waste combustor subject to the siting 
provisions under Sec. 60.57b, the siting analysis, the final materials 
separation plan, a record of the location and date of the public 
meetings, and the documentation of the responses to public comments 
received at the public meetings.
    (12) The records specified in paragraphs (d)(12)(i) through 
(d)(12)(iii) of this section.
    (i) Records showing the names of the municipal waste combustor 
chief facility operator, shift supervisors, and control room operators 
who have been provisionally certified by the American Society of 
Mechanical Engineers or an equivalent State-approved certification 
program as required by Sec. 60.54b(a) including the dates of initial 
and renewal certifications and documentation of current certification.
    (ii) Records showing the names of the municipal waste combustor 
chief facility operator, shift supervisors, and control room operators 
who have been fully certified by the American Society of Mechanical 
Engineers or an equivalent State-approved certification program as 
required by Sec. 60.54b(a) including the dates of initial and renewal 
certifications and documentation of current certification.
    (iii) Records showing the names of the municipal waste combustor 
chief facility operator, shift supervisors, and control room operators 
who have completed the EPA municipal waste combustor operator training 
course or a State-approved equivalent course as required by 
Sec. 60.54b(d) including documentation of training completion.
    (13) Records showing the names of persons who have completed a 
review of the operating manual as required by Sec. 60.54b(f) including 
the date of the initial review and subsequent annual reviews.
    (14) For affected facilities that apply activated carbon for 
mercury or dioxin/furan control, identification of the calendar dates 
when the average carbon mass feed rates recorded under (d)(4)(iii) of 
this section were less than either of the hourly carbon feed rates 
estimated during performance tests for mercury or dioxin/furan 
emissions and recorded under paragraphs (d)(4)(i) and (d)(4)(ii) of 
this section, respectively, with reasons for such feed rates and a 
description of corrective actions taken.
    (15) For affected facilities that apply activated carbon for 
mercury or dioxin/furan control, identification of the calendar dates 
when the carbon injection system operating parameter(s) that are the 
primary indicator(s) of carbon mass feed rate (e.g., screw feeder 
speed) recorded under paragraph (d)(4)(v) of this section are below the 
level(s) estimated during the performance tests as specified in 
Sec. 60.58b(m)(1)(i) and Sec. 60.58b(m)(1)(ii) of this section, with 
reasons for such occurrences and a description of corrective actions 
taken.
    (e) The owner or operator of an air curtain incinerator subject to 
the opacity limit under Sec. 60.56b shall maintain records of results 
of the initial opacity performance test and subsequent performance 
tests required by Sec. 60.58b(l) for a period of at least 5 years.
    (f) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall submit the 
information specified in paragraphs (f)(1) through (f)(6) of this 
section in the initial performance test report.
    (1) The initial performance test data as recorded under paragraphs 
(d)(2)(ii)(A) through (d)(2)(ii)(D) of this section for the initial 
performance test for sulfur dioxide, nitrogen oxides, carbon monoxide, 
municipal waste combustor unit load level, and particulate matter 
control device inlet temperature.
    (2) The test report documenting the initial performance test 
recorded under paragraph (d)(9) of this section for particulate matter, 
opacity, cadmium, lead, mercury, dioxins/furans, hydrogen chloride, and 
fugitive ash emissions.
    (3) The performance evaluation of the continuous emission 
monitoring system using the applicable performance specifications in 
appendix B of this part.
    (4) The maximum demonstrated municipal waste combustor unit load 
and maximum demonstrated particulate matter control device inlet 
temperature(s) established during the initial dioxin/furan performance 
test as recorded under paragraph (d)(9) of this section.
    (5) For affected facilities that apply activated carbon injection 
for mercury control, the owner or operator shall submit the average 
carbon mass feed rate recorded under paragraph (d)(4)(i) of this 
section.
    (6) For those affected facilities that apply activated carbon 
injection for dioxin/furan control, the owner or 

[[Page 65436]]
operator shall submit the average carbon mass feed rate recorded under 
paragraph (d)(4)(ii) of this section.
    (g) Following the first year of municipal combustor operation, the 
owner or operator of an affected facility located within a small or 
large municipal waste combustor plant shall submit an annual report 
including the information specified in paragraphs (g)(1) through (g)(4) 
of this section, as applicable, no later than February 1 of each year 
following the calendar year in which the data were collected (once the 
unit is subject to permitting requirements under Title V of the Act, 
the owner or operator of an affected facility must submit these reports 
semiannually).
    (1) A summary of data collected for all pollutants and parameters 
regulated under this subpart, which includes the information specified 
in paragraphs (g)(1)(i) through (g)(1)(v) of this section.
    (i) A list of the particulate matter, opacity, cadmium, lead, 
mercury, dioxins/furans, hydrogen chloride, and fugitive ash emission 
levels achieved during the performance tests recorded under paragraph 
(d)(9) of this section.
    (ii) A list of the highest emission level recorded for sulfur 
dioxide, nitrogen oxides, carbon monoxide, municipal waste combustor 
unit load level, and particulate matter control device inlet 
temperature based on the data recorded under paragraphs (d)(2)(ii)(A) 
through (d)(2)(ii)(D) of this section.
    (iii) List the highest opacity level measured, based on the data 
recorded under paragraph (d)(2)(i)(A) of this section.
    (iv) The total number of days that the minimum number of hours of 
data for sulfur dioxide, nitrogen oxides, carbon monoxide, municipal 
waste combustor unit load, and particulate matter control device 
temperature data were not obtained based on the data recorded under 
paragraph (d)(6) of this section.
    (v) The total number of hours that data for sulfur dioxide, 
nitrogen oxides, carbon monoxide, municipal waste combustor unit load, 
and particulate matter control device temperature were excluded from 
the calculation of average emission concentrations or parameters based 
on the data recorded under paragraph (d)(7) of this section.
    (2) The summary of data reported under paragraph (g)(1) of this 
section shall also provide the types of data specified in paragraphs 
(g)(1)(i) through (g)(1)(vi) of this section for the calendar year 
preceding the year being reported, in order to provide the 
Administrator with a summary of the performance of the affected 
facility over a 2-year period.
    (3) The summary of data including the information specified in 
paragraphs (g)(1) and (g)(2) of this section shall highlight any 
emission or parameter levels that did not achieve the emission or 
parameter limits specified under this subpart.
    (4) A notification of intent to begin the reduced dioxin/furan 
performance testing schedule specified in Sec. 60.58b(g)(5)(iii) of 
this section during the following calendar year.
    (h) The owner or operator of an affected facility located within a 
small or large municipal waste combustor plant shall submit a 
semiannual report that includes the information specified in paragraphs 
(h)(1) through (h)(5) of this section for any recorded pollutant or 
parameter that does not comply with the pollutant or parameter limit 
specified under this subpart, according to the schedule specified under 
paragraph (h)(6) of this section.
    (1) The semiannual report shall include information recorded under 
paragraph (d)(3) of this section for sulfur dioxide, nitrogen oxides, 
carbon monoxide, municipal waste combustor unit load level, particulate 
matter control device inlet temperature, and opacity.
    (2) For each date recorded as required by paragraph (d)(3) of this 
section and reported as required by paragraph (h)(1) of this section, 
the semiannual report shall include the sulfur dioxide, nitrogen 
oxides, carbon monoxide, municipal waste combustor unit load level, 
particulate matter control device inlet temperature, or opacity data, 
as applicable, recorded under paragraphs (d)(2)(ii)(A) through 
(d)(2)(ii)(D) and (d)(2)(i)(A) of this section, as applicable.
    (3) If the test reports recorded under paragraph (d)(9) of this 
section document any particulate matter, opacity, cadmium, lead, 
mercury, dioxins/furans, hydrogen chloride, and fugitive ash emission 
levels that were above the applicable pollutant limits, the semiannual 
report shall include a copy of the test report documenting the emission 
levels and the corrective actions taken.
    (4) The semiannual report shall include the information recorded 
under paragraph (d)(15) of this section for the carbon injection system 
operating parameter(s) that are the primary indicator(s) of carbon mass 
feed rate.
    (5) For each operating date reported as required by paragraph 
(h)(4) of this section, the semiannual report shall include the carbon 
feed rate data recorded under paragraph (d)(4)(iii) of this section.
    (6) Semiannual reports required by paragraph (h) of this section 
shall be submitted according to the schedule specified in paragraphs 
(h)(6)(i) and (h)(6)(ii) of this section.
    (i) If the data reported in accordance with paragraphs (h)(1) 
through (h)(5) of this section were collected during the first calendar 
half, then the report shall be submitted by August 1 following the 
first calendar half.
    (ii) If the data reported in accordance with paragraphs (h)(1) 
through (h)(5) of this section were collected during the second 
calendar half, then the report shall be submitted by February 1 
following the second calendar half.
    (i) The owner or operator of an air curtain incinerator subject to 
the opacity limit under Sec. 60.56b shall submit the results of the 
initial opacity performance test and all subsequent annual performance 
tests recorded under paragraph (e) of this section. Annual performance 
tests shall be submitted by February 1 of the year following the year 
of the performance test.
    (j) All reports specified under paragraphs (a), (b), (c), (f), (g), 
(h), and (i) of this section shall be submitted as a paper copy, 
postmarked on or before the submittal dates specified under these 
paragraphs, and maintained onsite as a paper copy for a period of 5 
years.
    (k) All records specified under paragraphs (d) and (e) of this 
section shall be maintained onsite in either paper copy or computer-
readable format, unless an alternative format is approved by the 
Administrator.
    (l) If an owner or operator would prefer to select a different 
annual or semiannual date for submitting the periodic reports required 
by paragraphs (g), (h) and (i) of this section, then the dates may be 
changed by mutual agreement between the owner or operator and the 
Administrator according to the procedures specified in Sec. 60.19(c) of 
subpart A of this part.

[FR Doc. 95-30257 Filed 12-18-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-30254 Standards of Performance for Municipal Waste Combustors
[Federal Register Volume 60, Number 243 (Tuesday, December 19, 1995)]
[Rules and Regulations]
[Pages 65382-65387]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-30254]

[[Page 65381]]

_______________________________________________________________________

Part II

Environmental Protection Agency

_______________________________________________________________________

40 CFR Part 60

Standards of Performance for Municipal Waste Combustors and Emission 
Guidelines; Final Rules, Proposed Rule and Notice

Federal Register / Vol. 60, No. 243 / Tuesday, December 19, 1995 / 
Rules and Regulations

[[Page 65382]]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 60

[AD-FRL-5327-3]

Standards of Performance for Municipal Waste Combustors

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: This action amends the ``Standards of Performance for 
Municipal Waste Combustors'' (subpart Ea). These amendments are being 
made to improve the clarity of subpart Ea and to make subpart Ea 
consistent with subparts Eb and Cb.

DATES: The direct final rule Secs. 60.17, 60.50a, 60.51a, 60.56a, 
60.58a, and 60.59a will be effective January 29, 1996 unless 
significant adverse comments are received by January 18, 1996. If 
significant adverse comments are received on any amendment in this 
rule, that amendment will be withdrawn by timely publication in the 
Federal Register. The incorporation by reference of certain 
publications listed in this regulation is approved by the Director of 
the Federal Register as of January 29, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Walter Stevenson at (919) 541-5264 
or Mr. Fred Porter at (919) 541-5251, Combustion Group, Emission 
Standards Division (MD-13), U.S. Environmental Protection Agency, 
Research Triangle Park, North Carolina 27711.

SUPPLEMENTARY INFORMATION: If significant adverse comments are received 
on any amendment of this direct final rule, the comments will be 
addressed in a subsequent rulemaking in the Federal Register based on 
those provisions of the proposed rule contained in the Proposed Rules 
Section of this Federal Register that is identical to this direct final 
rule. The amendments in question will be withdrawn from this direct 
final rule. Amendments of the direct final rule that do not receive any 
significant adverse comments will become final 40 days from today's 
Federal Register notice. If no significant adverse comments are filed 
on any provision of this direct final rule, then the entire direct 
final rule will become effective 40 days from today's Federal Register 
notice and no further action is contemplated on the parallel proposal 
published today.
    On February 11, 1991 (56 FR 5488), the EPA promulgated in the 
Federal Register new source performance standards (NSPS) for municipal 
waste combustors (MWC's) for which construction, modification, or 
reconstruction is commenced after December 20, 1989. The regulations 
were promulgated as subpart Ea in 40 CFR part 60.
    Today's action modifies the applicability and definitions sections 
of the final regulation to improve clarity and make them consistent 
with those of subparts Eb (standards of performance for new MWC's for 
which construction commenced after September 20, 1994 or modification 
or reconstruction commenced after June 19, 1996, and Cb (emission 
guidelines for existing MWC's for which construction commenced on or 
before September 20, 1994) that are being promulgated in a separate 
section of today's Federal Register. Today's changes do not 
significantly modify the requirements of the regulation. The revisions 
are discussed in the order in which they appear in the subpart Ea 
regulation.
    Preamble Outline: The following outline is provided to aid in 
locating information in this preamble.

I. Description of Changes
    A. Dates of Applicability
    B. Applicability of Cofired Combustors and Tire-Burning 
Facilities
    C. Applicability of Subpart Ea to Certain Other Facilities
    D. Definitions
    1. Definitions of Modification and Reconstruction
    2. Definition of MSW and Calculation of MWC Unit Capacity
    3. Definition of an MWC
    E. Clarification of the Carbon Monoxide Standard
    F. Update of Operator Training Specifications
    G. Clarification of MWC Unit Load Measurement
II. Judicial Review
III. Administrative
    A. Paperwork Reduction Act
    B. Executive Order 12291 Review
    C. Regulatory Flexibility Act

I. Description of Changes

A. Dates of Applicability

    Subpart Ea is applicable to MWC units with capacities greater than 
225 megagrams per day (Mg/day) of municipal solid waste (MSW) for which 
construction, modification, or reconstruction was commenced after 
December 20, 1989. To avoid overlap with the subpart Eb NSPS, the dates 
for applicability for subpart Ea specified in Sec. 60.50a(a) are being 
changed to apply to MWC's (1) commencing construction after December 
20, 1989 and on or before September 20, 1994 or (2) commencing 
modification or reconstruction after December 20, 1989 and on or before 
June 19, 1996. The MWC plants that commence construction after 
September 20, 1994 or that commence modification or reconstruction 
after June 19, 1996 are subject to subpart Eb, which is more stringent 
than subpart Ea. The change is also being made to subpart Ea to avoid 
the same MWC plant being subject to duplicative requirements under two 
NSPS (subparts Ea and Eb). This change is reflected in the definitions 
for ``MWC plant'' and ``MWC plant capacity'' in Sec. 60.51a. It should 
be noted that plants that are subject to subpart Ea will also be 
subject to the emission guidelines contained in subpart Cb, which apply 
to plants constructed on or before September 20, 1994.

B. Applicability to Cofired Combustors and Tire-Burning Facilities

    The wording in Sec. 60.50a (c), (d), and (e) is being changed so 
that cofired facilities and facilities that only burn tires are clearly 
defined as not being subject to any sections of subpart Ea. Currently, 
they are exempt from all requirements of subpart Ea except 
recordkeeping requirements. This change will make subpart Ea consistent 
with subparts Eb and Cb. It will also clarify that, for purposes of the 
title V operating permits program, such facilities are not considered 
subject to subpart Ea. In addition, because the applicability to 
cofired combustors has been clarified, the definition of ``cofired 
combustor'' has been revised in Sec. 60.51a. Relative to these changes, 
Sec. 60.58(j)(3) is being removed and items in Sec. 60.59a (a)(1), 
(b)(14), and (m) are being moved to Sec. 60.50a(d).

C. Applicability of Subpart Ea to Certain Other Facilities

    Section 129 of the Clean Air Act (Act) specifies that qualifying 
cogeneration facilities, qualifying small independent power producers, 
Solid Waste Disposal Act section 3005 permitted facilities, and 
materials recovery facilities recovering metals are not MWC's and are 
not regulated under section 129. Subparts Eb and Cb specify that these 
units are not subject to subparts Eb and Cb. Additionally, subparts Eb 
and Cb specify that pyrolysis/combustion units that are an integrated 
part of a plastics/ rubber processing unit are not subject to the MWC 
regulations. These exemptions are being incorporated into subpart Ea 
(Sec. 60.50a (g), (h), (i), (j), and (k)) to be consistent with 
subparts Eb and Cb.

D. Definitions

    Revisions are being made to 13 definitions, 13 new definitions are 
being added, and 2 are being deleted to clarify subpart Ea and make it 
consistent with 

[[Page 65383]]
the terms defined in subpart Eb. Several of these definitions are 
discussed below.
1. Definitions of Modification and Reconstruction
    Two new terms, ``modification'' (or ``modified municipal waste 
combustor'') and ``reconstruction'', are being added to Sec. 60.51a to 
incorporate the section 129 definition of ``modified solid waste 
incineration unit.'' These definitions are very similar to the 
definitions of these two terms in Secs. 60.14 and 60.15 of 40 CFR 60 
subpart A (the NSPS general provisions). The addition of these 
definitions will clarify subpart Ea and make the terms used in subparts 
Ea, Eb, Cb, and section 129 relating to modification and reconstruction 
consistent with each other.
2. Definition of MSW and Calculation of MWC Unit Capacity
    To avoid confusion and possible conflict with the pending medical 
waste incinerator (MWI) regulations which were proposed in February 
1995 and are scheduled to be promulgated in the near future, the 
definition of MSW in Sec. 60.51a of subpart Ea is being revised to be 
consistent with subparts Eb and Cb. Additionally, the determination of 
``MWC unit capacity'' in Sec. 60.58a(j)(4) and its definition in 
Sec. 60.51a are being revised so that only a single heat input value is 
used for MSW. This change is being made so that subpart Ea will be 
consistent with subparts Eb and Cb. Section 60.59a(b)(15) is also being 
deleted.
    In addition to the clarification concerning medical waste, the 
definition of MSW in Sec. 60.51a is being revised to specify that 
``clean wood'' is excluded, while refuse-derived fuel (RDF) and yard 
waste are included. To ensure clarity, definitions for ``clean wood'', 
``untreated lumber'', and ``yard waste'' are being added to 
Sec. 60.51a. Because the definition of MSW is being revised to clarify 
that RDF is a type of preprocessed MSW and not a different type of 
waste, the phrase ``MSW or RDF'' in several paragraphs is being 
replaced with ``MSW'' to avoid redundancy. These clarifications are 
consistent with the intent of subpart Ea, and will make the definition 
of MSW consistent with subparts Eb and Cb.
3. Definition of an MWC
    The definition of an MWC in Sec. 60.51a is being revised to be 
consistent with that in subpart Eb. The most significant difference is 
the addition of a description of the physical boundaries of an MWC. The 
clarification of the boundaries of the affected facility will assist in 
considering cost for making reconstruction determinations.

E. Clarification of the Carbon Monoxide Standard

    The specifications for the carbon monoxide (CO) standards in 
Secs. 60.56a(a) and 60.58(a) (h)(1) and (h)(2) are being revised to 
clarify the EPA's intent as to which standard applies to which 
combustor type. It was intended that the mass burn refractory unit CO 
standard apply to both mass burn refractory units and rotary mass burn 
refractory units. This was not clear in the promulgated regulation 
because the definition in Sec. 60.51a of mass burn refractory units 
excluded rotary mass burn refractory units. In order to clarify this, 
the definition of mass burn refractory unit is being clarified to 
include rotary mass burn rotary refractory units.
    It was also intended that the CO standard for coal/RDF mixed fuel-
fired units be applicable to pulverized coal-type units, as opposed to 
spreader stoker-type units that would fall under the RDF stoker 
standard. Accordingly, the coal/RDF mixed fuel-fired combustor CO 
standard is being renamed the pulverized coal/RDF mixed fuel-fired 
combustor CO standard, and a CO standard for spreader stoker coal/RDF 
mixed fuel-fired combustors equivalent to the RDF stoker standard is 
being listed separately. Corresponding definitions are being added and 
revised in Sec. 60.51a.

F. Update of Operator Training Specifications

    The operator training requirements in Sec. 60.56a(d) specify that 
provisional or operator certification shall be obtained in accordance 
with the American Society of Mechanical Engineers (ASME) QRO-1-1989 
requirements or an equivalent State-approved certification program. The 
ASME standard was updated in 1994 and so, to be consistent with 
subparts Eb and Cb, the reference is being updated to QRO-1-1994.

G. Clarification of MWC Unit Load Measurement

    The MWC unit load measurement specified in Sec. 60.58a(h)(6) is 
being modified to include feedwater flow monitoring as an alternative 
to steam flow measurement. The wording of this section is being revised 
to match the wording in subparts Eb and Cb and a definition of ``MWC 
unit load'' is being added to Sec. 60.51a.

II. Judicial Review

    Under section 307(b)(1) of the Act, judicial review of the actions 
taken by this final rule is available only on the filing of a petition 
for review in the U.S. Court of Appeals for the District of Columbia 
Circuit within 60 days of today's publication of this action. Under 
section 307(b)(2) of the Act, the requirements that are subject to 
today's rule may not be challenged later in civil or criminal 
proceedings brought by the EPA to enforce these requirements.

III. Administrative

A. Paperwork Reduction Act

    The information collection requirements of the previously 
promulgated NSPS were submitted to and approved by the Office of 
Management and Budget (OMB). A copy of this Information Collection 
Request (ICR) document (the ICR number is 1506.4, with an OMB approval 
number 2060-0210) may be obtained from Sandy Farmer, Regulatory 
Information Division (Code 2136), U.S. Environmental Protection Agency, 
401 M Street, SW, Washington, DC 20460 or by calling (202) 260-2740.
    Today's changes to the NSPS will have no significant impact on the 
information collection burden estimates made previously. The burden 
will be reduced slightly. Consequently, the ICR has not been revised.

B. Executive Order 12291 Review

    The MWC NSPS promulgated on February 11, 1991 was considered a 
``major rule'' under Executive Order 12291 and a regulatory impact 
analysis (RIA) was prepared. The amendments issued today clarify the 
rule and do not add any additional control requirements. The EPA 
concludes these amendments would have a negligible impact on the 
results of the RIA and the change is considered to be within the 
flexibility of the analysis.

C. Regulatory Flexibility Act

    The Regulatory Flexibility Act of 1980 requires the identification 
of potentially adverse impacts of Federal regulations upon small 
business entities. The Act specifically requires the completion of a 
regulatory flexibility analysis in those instances where small business 
impacts are possible. Because this rulemaking imposes no adverse 
economic impacts, a regulatory flexibility analysis has not been 
prepared.

List of Subjects in 40 CFR Part 60

    Environmental protection, Air pollution control, Incorporation by 
reference, Reporting and recordkeeping requirements.

[[Page 65384]]

    Dated: October 31, 1995.
Carol M. Browner,
Administrator.

    For reasons set out in the preamble, title 40, chapter I, part 60, 
subpart Ea of the Code of Federal Regulations is corrected as follows:

PART 60--[AMENDED]

    1. The authority citation for part 60 is revised to read as 
follows:

    Authority: 42 U.S.C. 7401, 7411, 7414, 7416, 7429, and 7601.

Subpart Ea Heading--[Revised]

    2. The heading for subpart Ea is revised to read as follows:

Subpart Ea--Standards of Performance for Municipal Waste Combustors 
for which Construction is Commenced after December 20, 1989 and on 
or before September 20, 1994

    3. Section 60.17 of subpart A of part 60 is amended by revising 
paragraphs (h)(1), (h)(2), and (h)(3) to read as follows:

Sec. 60.17  Incorporation by reference.

* * * * *
    (h) * * *
    (1) ASME QRO-1-1994, Standard for the Qualification and 
Certification of Resource Recovery Facility Operators, IBR approved for 
Sec. 60.56a.
    (2) ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test 
Code for Steam Generating Units (with 1968 and 1969 Addenda), IBR 
approved for Secs. 60.46b and 60.58a(h)(6)(ii).
    (3) ASME Interim Supplement 19.5 on Instruments and Apparatus: 
Application, Part II of Fluid Meters, 6th Edition (1971), IBR approved 
for Sec. 60.58a(h)(6)(ii).
* * * * *
    4. Section 60.50a is amended by revising paragraphs (a), (c), (d), 
(e), and (f), removing paragraph (g), redesignating paragraph (h) as 
paragraph (l), redesignating paragraph (i) as paragraph (m), and adding 
new paragraphs (g), (h), (i), (j), and (k) to read as follows:

Sec. 60.50a  Applicability and delegation of authority.

    (a) The affected facility to which this subpart applies is each 
municipal waste combustor unit with a municipal waste combustor unit 
capacity greater than 225 megagrams per day (250 tons per day) of 
municipal solid waste for which construction, modification, or 
reconstruction is commenced as specified in paragraphs (a)(1) and 
(a)(2) of this section.
    (1) Construction is commenced after December 20, 1989 and on or 
before September 20, 1994.
    (2) Modification or reconstruction is commenced after December 20, 
1989 and on or before June 19, 1996.
* * * * *
    (c) Any unit combusting a single-item waste stream of tires is not 
subject to this subpart if the owner or operator of the unit:
    (1) Notifies the Administrator of an exemption claim; and
    (2) Provides data documenting that the unit qualifies for this 
exemption.
    (d) Any cofired combustor, as defined under Sec. 60.51a, located at 
a plant that meets the capacity specifications in paragraph (a) of this 
section is not subject to this subpart if the owner or operator of the 
cofired combustor:
    (1) Notifies the Administrator of an exemption claim;
    (2) Provides a copy of the federally enforceable permit (specified 
in the definition of cofired combustor in this section); and
    (3) Keeps a record on a calendar quarter basis of the weight of 
municipal solid waste combusted at the cofired combustor and the weight 
of all other fuels combusted at the cofired combustor.
    (e) Any cofired combustor that is subject to a federally 
enforceable permit limiting the operation of the combustor to no more 
than 225 megagrams per day (250 tons per day) of municipal solid waste 
is not subject to this subpart.
    (f) Physical or operational changes made to an existing municipal 
waste combustor unit primarily for the purpose of complying with 
emission guidelines under subpart Cb are not considered a modification 
or reconstruction and do not result in an existing municipal waste 
combustor unit becoming subject to this subpart.
    (g) A qualifying small power production facility, as defined in 
section 3(17)(C) of the Federal Power Act (16 U.S.C. 796(17)(C)), that 
burns homogeneous waste (such as automotive tires or used oil, but not 
including refuse-derived fuel) for the production of electric energy is 
not subject to this subpart if the owner or operator of the facility 
notifies the Administrator of an exemption claim and provides data 
documenting that the facility qualifies for this exemption.
    (h) A qualifying cogeneration facility, as defined in section 
3(18)(B) of the Federal Power Act (16 U.S.C. 796(18)(B)), that burns 
homogeneous waste (such as automotive tires or used oil, but not 
including refuse-derived fuel) for the production of electric energy 
and steam or forms of useful energy (such as heat) that are used for 
industrial, commercial, heating, or cooling purposes, is not subject to 
this subpart if the owner or operator of the facility notifies the 
Administrator of an exemption claim and provides data documenting that 
the facility qualifies for this exemption.
    (i) Any unit required to have a permit under section 3005 of the 
Solid Waste Disposal Act is not subject to this subpart.
    (j) Any materials recovery facility (including primary or secondary 
smelters) that combusts waste for the primary purpose of recovering 
metals is not subject to this subpart.
    (k) Pyrolysis/combustion units that are an integrated part of a 
plastics/rubber recycling unit (as defined in Sec. 60.51a) are not 
subject to this subpart if the owner or operator of the plastics/rubber 
recycling unit keeps records of: the weight of plastics, rubber, and/or 
rubber tires processed on a calendar quarter basis; the weight of 
chemical plant feedstocks and petroleum refinery feedstocks produced 
and marketed on a calendar quarter basis; and the name and address of 
the purchaser of the feedstocks. The combustion of gasoline, diesel 
fuel, jet fuel, fuel oils, residual oil, refinery gas, petroleum coke, 
liquified petroleum gas, propane, or butane produced by chemical plants 
or petroleum refineries that use feedstocks produced by plastics/rubber 
recycling units are not subject to this subpart.
* * * * *
    5. Section 60.51a is amended:
    a. by removing the definitions of ``coal/RDF mixed fuel fired 
combustor'', ``large MWC plant'', ``mass burn refractory MWC'', ``mass 
burn rotary waterwall MWC'', ``mass burn waterwall MWC'', ``maximum 
demonstrated MWC unit load'', ``medical waste'', ``municipal-type solid 
waste or MSW'', ``municipal waste combustor or MWC unit'', ``MWC 
plant'', ``MWC plant capacity'', and ``MWC unit capacity'', and;
    b. by revising the definitions for ``cofired combustor'', ``maximum 
demonstrated particulate matter control device temperature'', and 
``standard conditions'', and;
    c. by adding new entries to the section. The revised entries and 
the new entries are set out to read as follows:

Sec. 60.51a  Definitions.

* * * * *
    Calendar quarter means a consecutive 3-month period 
(nonoverlapping) beginning on January 1, April 1, July 1, and October 
1.
* * * * * 

[[Page 65385]]

    Clean wood means untreated wood or untreated wood products 
including clean untreated lumber, tree stumps (whole or chipped), and 
tree limbs (whole or chipped). Clean wood does not include yard waste, 
which is defined elsewhere in this section, or construction, 
renovation, and demolition wastes (which includes but is not limited to 
railroad ties and telephone poles), which are exempt from the 
definition of municipal solid waste in this section.
    Cofired combustor means a unit combusting municipal solid waste 
with nonmunicipal solid waste fuel (e.g., coal, industrial process 
waste) and subject to a federally enforceable permit limiting the unit 
to combusting a fuel feed stream, 30 percent or less of the weight of 
which is comprised, in aggregate, of municipal solid waste as measured 
on a calendar quarter basis.
* * * * *
    Large municipal waste combustor plant means a municipal waste 
combustor plant with a municipal waste combustor aggregate plant 
capacity for affected facilities that is greater than 225 megagrams per 
day (250 tons per day) of municipal solid waste.
    Mass burn refractory municipal waste combustor means a field-
erected combustor that combusts municipal solid waste in a refractory 
wall furnace. Unless otherwise specified, this includes combustors with 
a cylindrical rotary refractory wall furnace.
    Mass burn rotary waterwall municipal waste combustor means a field-
erected combustor that combusts municipal solid waste in a cylindrical 
rotary waterwall furnace.
    Mass burn waterwall municipal waste combustor means a field-erected 
combustor that combusts municipal solid waste in a waterwall furnace.
    Maximum demonstrated municipal waste combustor unit load means the 
highest 4-hour arithmetic average municipal waste combustor unit load 
achieved during four consecutive hours during the most recent dioxin/
furan performance test demonstrating compliance with the applicable 
limit for municipal waste combustor organics specified under 
Sec. 60.53a.
    Maximum demonstrated particulate matter control device temperature 
means the highest 4-hour arithmetic average flue gas temperature 
measured at the particulate matter control device inlet during four 
consecutive hours during the most recent dioxin/furan performance test 
demonstrating compliance with the applicable limit for municipal waste 
combustor organics specified under Sec. 60.53a.
* * * * *
    Modification or modified municipal waste combustor unit means a 
municipal waste combustor unit to which changes have been made if the 
cumulative cost of the changes, over the life of the unit, exceed 50 
percent of the original cost of construction and installation of the 
unit (not including the cost of any land purchased in connection with 
such construction or installation) updated to current costs; or any 
physical change in the municipal waste combustor unit or change in the 
method of operation of the municipal waste combustor unit increases the 
amount of any air pollutant emitted by the unit for which standards 
have been established under section 129 or section 111. Increases in 
the amount of any air pollutant emitted by the municipal waste 
combustor unit are determined at 100-percent physical load capability 
and downstream of all air pollution control devices, with no 
consideration given for load restrictions based on permits or other 
nonphysical operational restrictions.
* * * * *
    Municipal solid waste or municipal-type solid waste or MSW means 
household, commercial/retail, and/or institutional waste. Household 
waste includes material discarded by single and multiple residential 
dwellings, hotels, motels, and other similar permanent or temporary 
housing establishments or facilities. Commercial/retail waste includes 
material discarded by stores, offices, restaurants, warehouses, 
nonmanufacturing activities at industrial facilities, and other similar 
establishments or facilities. Institutional waste includes material 
discarded by schools, nonmedical waste discarded by hospitals, material 
discarded by nonmanufacturing activities at prisons and government 
facilities, and material discarded by other similar establishments or 
facilities. Household, commercial/retail, and institutional waste does 
not include used oil; sewage sludge; wood pallets; construction, 
renovation, and demolition wastes (which includes but is not limited to 
railroad ties and telephone poles); clean wood; industrial process or 
manufacturing wastes; medical waste; or motor vehicles (including motor 
vehicle parts or vehicle fluff). Household, commercial/retail, and 
institutional wastes include:
    (1) Yard waste;
    (2) Refuse-derived fuel; and
    (3) Motor vehicle maintenance materials limited to vehicle 
batteries and tires except as specified in Sec. 60.50a(c).
    Municipal waste combustor, MWC, or municipal waste combustor unit: 
(1) Means any setting or equipment that combusts solid, liquid, or 
gasified MSW including, but not limited to, field-erected incinerators 
(with or without heat recovery), modular incinerators (starved-air or 
excess-air), boilers (i.e., steam-generating units), furnaces (whether 
suspension-fired, grate-fired, mass-fired, air curtain incinerators, or 
fluidized bed-fired), and pyrolysis/combustion units. Municipal waste 
combustors do not include pyrolysis/combustion units located at 
plastics/ rubber recycling units (as specified in Sec. 60.50a(k) of 
this section). Municipal waste combustors do not include internal 
combustion engines, gas turbines, or other combustion devices that 
combust landfill gases collected by landfill gas collection systems.
    (2) The boundaries of an MWC are defined as follows. The MWC unit 
includes, but is not limited to, the MSW fuel feed system, grate 
system, flue gas system, bottom ash system, and the combustor water 
system. The MWC boundary starts at the MSW pit or hopper and extends 
through:
    (i) The combustor flue gas system, which ends immediately following 
the heat recovery equipment or, if there is no heat recovery equipment, 
immediately following the combustion chamber;
    (ii) The combustor bottom ash system, which ends at the truck 
loading station or similar ash handling equipment that transfer the ash 
to final disposal, including all ash handling systems that are 
connected to the bottom ash handling system; and
    (iii) The combustor water system, which starts at the feed water 
pump and ends at the piping exiting the steam drum or superheater.
    (3) The MWC unit does not include air pollution control equipment, 
the stack, water treatment equipment, or the turbine generator set.
* * * * *
    Municipal waste combustor plant means one or more MWC units at the 
same location for which construction, modification, or reconstruction 
is commenced after December 20, 1989 and on or before September 20, 
1994.
    Municipal waste combustor plant capacity means the aggregate MWC 
unit capacity of all MWC units at an MWC plant for which construction, 
modification, or reconstruction of the units commenced after December 
20, 

[[Page 65386]]
1989 and on or before September 20, 1994. Any MWC units for which 
construction, modification, or reconstruction is commenced on or before 
December 20, 1989 or after September 20, 1994 are not included for 
determining applicability under this subpart.
    Municipal waste combustor unit capacity means the maximum design 
charging rate of an MWC unit expressed in megagrams per day (tons per 
day) of MSW combusted, calculated according to the procedures under 
Sec. 60.58a(j). Municipal waste combustor unit capacity is calculated 
using a design heating value of 10,500 kilojoules per kilogram (4,500 
British thermal units per pound) for MSW. The calculational procedures 
under Sec. 60.58a(j) include procedures for determining MWC unit 
capacity for continuous and batch feed MWC's.
    Municipal waste combustor unit load means the steam load of the MWC 
unit measured as specified in Sec. 60.58a(h)(6).
* * * * *
    Plastics/rubber recycling unit means an integrated processing unit 
where plastics, rubber, and/or rubber tires are the only feed materials 
(incidental contaminants may be included in the feed materials) and 
they are processed into a chemical plant feedstock or petroleum 
refinery feedstock, where the feedstock is marketed to and used by a 
chemical plant or petroleum refinery as input feedstock. The combined 
weight of the chemical plant feedstock and petroleum refinery feedstock 
produced by the plastics/rubber recycling unit on a calendar quarter 
basis shall be more than 70 percent of the combined weight of the 
plastics, rubber, and rubber tires processed by the plastics/rubber 
recycling unit on a calendar quarter basis. The plastics, rubber, and/
or rubber tire feed materials to the plastics/rubber recycling unit may 
originate from the separation or diversion of plastics, rubber, or 
rubber tires from MSW or industrial solid waste, and may include 
manufacturing scraps, trimmings, and off-specification plastics, 
rubber, and rubber tire discards. The plastics, rubber, and rubber tire 
feed materials to the plastics/rubber recycling unit may contain 
incidental contaminants (e.g., paper labels on plastic bottles, metal 
rings on plastic bottle caps, etc.).
* * * * *
    Pulverized coal/refuse-derived fuel mixed fuel-fired combustor or 
pulverized coal/RDF mixed fuel-fired combustor means a combustor that 
fires coal and RDF simultaneously, in which pulverized coal is 
introduced into an air stream that carries the coal to the combustion 
chamber of the unit where it is fired in suspension. This includes both 
conventional pulverized coal and micropulverized coal.
    Pyrolysis/combustion unit means a unit that produces gases, 
liquids, or solids through the heating of MSW, and the gases, liquids, 
or solids produced are combusted and emissions vented to the 
atmosphere.
    Reconstruction means rebuilding an MWC unit for which the 
cumulative costs of the construction over the life of the unit exceed 
50 percent of the original cost of construction and installation of the 
unit (not including any cost of land purchased in connection with such 
construction or installation) updated to current costs (current 
dollars).
    Refractory unit or refractory wall furnace means a combustion unit 
having no energy recovery (e.g., via a waterwall) in the furnace (i.e., 
radiant heat transfer section) of the combustor.
* * * * *
    Spreader stoker coal/refuse-derived fuel mixed fuel-fired combustor 
or spreader stoker coal/RDF mixed fuel-fired combustor means a 
combustor that fires coal and refuse-derived fuel simultaneously, in 
which coal is introduced to the combustion zone by a mechanism that 
throws the fuel onto a grate from above. Combustion takes place both in 
suspension and on the grate.
    Standard conditions means a temperature of 20  deg.C (68  deg.F) 
and a pressure of 101.3 kilopascals (29.92 inches of mercury).
* * * * *
    Untreated lumber means wood or wood products that have been cut or 
shaped and include wet, air-dried, and kiln-dried wood products. 
Untreated lumber does not include wood products that have been painted, 
pigment-stained, or ``pressure-treated.'' Pressure-treating compounds 
include, but are not limited to, chromate copper arsenate, 
pentachlorophenol, and creosote.
    Waterwall furnace means a combustion unit having energy (heat) 
recovery in the furnace (i.e., radiant heat transfer section) of the 
combustor.
    Yard waste means grass, grass clippings, bushes, shrubs, and 
clippings from bushes and shrubs that are generated by residential, 
commercial/retail, institutional, and/or industrial sources as part of 
maintenance activities associated with yards or other private or public 
lands. Yard waste does not include construction, renovation, and 
demolition wastes, which are exempt from the definition of MSW in this 
section. Yard waste does not include clean wood, which is exempt from 
the definition of MSW in this section.
    6. Section 60.56a, paragraph (a), Table 1, is amended by removing 
the entry for ``Coal/RDF mixed fuel-fired combustors'' and adding 
entries for ``Pulverized coal/RDF mixed fuel-fired combustor'' and 
``Spreader stoker coal/RDF mixed fuel-fired combustor'' to the end of 
the table; by revising paragraph (d); and by removing and reserving 
paragraph (f)(9) to read as follows:

Sec. 60.56a  Standards for municipal waste combustor operating 
practices.

    (a) * * *

                    Table 1.--MWC Operating Standards                   
------------------------------------------------------------------------
                                                         Carbon monoxide
                                                         emission limit 
                    MWC technology                         (parts per   
                                                           million by   
                                                           volume)\1\   
------------------------------------------------------------------------
                                                                        
*                  *                  *                  *              
                  *                  *                  *               
Pulverized coal/RDF mixed fuel-fired combustor........               150
Spreader stoker coal/RDF mixed fuel-fired combustor...              150 
------------------------------------------------------------------------
\1\ Measured at the combustor outlet in conjunction with a measurement  
  of oxygen concentration, corrected to 7 percent oxygen (dry basis).   
  The averaging times are specified in Sec.  60.58a(h).                 

* * * * *
    (d) Within 24 months from the date of start-up of an affected 
facility or before February 11, 1993, whichever is later, each chief 
facility operator and shift 

[[Page 65387]]
supervisor of an affected faciltiy located within a large MWC plant 
shall obtain and keep current either a provisional or operator 
certification in accordance with ASME QRO-1-1994 (incorporated by 
reference, see Sec. 60.17) or an equivalent State-approved 
certification program.
* * * * *
    (f) * * *
    (9) [Reserved]
* * * * *
    7. Section 60.58a is amended by revising paragraphs (h)(1), (h)(2), 
(h)(6)(i), (h)(6)(ii), and (h)(10), redesignating paragraph (h)(6)(iii) 
as paragraph (h)(6)(v), adding new paragraphs (h)(6)(iii) and 
(h)(6)(iv), removing and reserving paragraph (j)(3), and revising 
paragraph (j)(4), to read as follows:

Sec. 60.58a  Compliance and performance testing.

* * * * *
    (h) * * *
    (1) Compliance with the carbon monoxide emission limits in 
Sec. 60.56a(a) shall be determined using a 4-hour block arithmetic 
average for all types of affected facilities except mass burn rotary 
waterwall MWC's, RDF stokers, and spreader stoker/RDF mixed fuel-fired 
combustors.
    (2) For affected mass burn rotary waterwall MWC's, RDF stokers, and 
spreader stoker/RDF mixed fuel-fired combustors, compliance with the 
carbon monoxide emission limits in Sec. 60.56a(a) shall be determined 
using a 24-hour daily arithmetic average.
* * * * *
    (6) * * *
    (i) The owner or operator of an affected facility with steam 
generation capability shall install, calibrate, maintain, and operate a 
steam flow meter or a feedwater flow meter; measure steam or feedwater 
flow in kilograms per hour (pounds per hour) on a continuous basis; and 
record the output of the monitor. Steam or feedwater flow shall be 
calculated in 4-hour block arithmetic averages.
    (ii) The method included in ``American Society of Mechanical 
Engineers Power Test Codes: Test Code for Steam Generating Units, Power 
Test Code 4.1--1964'', Section 4 (incorporated by reference, see 
Sec. 60.17) shall be used for calculating the steam (or feedwater flow) 
required under paragraph (h)(6)(i) of this section. The recommendations 
of ``American Society of Mechanical Engineers Interim Supplement 19.5 
on Instruments and Apparatus: Application, Part II of Fluid Meters, 6th 
edition (1971),'' chapter 4 (incorporated by reference, see Sec. 60.17) 
shall be followed for design, construction, installation, calibration, 
and use of nozzles and orifices except as specified in (h)(6)(iii) of 
this section.
    (iii) Measurement devices such as flow nozzles and orifices are not 
required to be recalibrated after they are installed.
    (iv) All signal conversion elements associated with steam (or 
feedwater flow) measurements must be calibrated according to the 
manufacturer's instructions before each dioxin/furan compliance and 
performance test, and at least once per year.
* * * * *
    (10) At a minimum, valid CEMS data for carbon monoxide, steam or 
feedwater flow, and particulate matter control device inlet temperature 
shall be obtained 75 percent of the hours per day for 75 percent of the 
days per month the affected facility is operated and combusting MSW.
* * * * *

    (j) * * *

    (3) [Reserved]

    (4) The MWC unit capacity shall be calculated using a design 
heating value of 10,500 kilojoules per kilogram (4,500 British thermal 
units per pound) for all MSW.

* * * * *

Sec. 60.59a  [Amended]

    8. Section 60.59a is amended by removing paragraphs (a)(1), 
(b)(14), (b)(15), and (m), and removing the third sentence of paragraph 
(e).

[FR Doc. 95-30254 Filed 12-18-95; 8:45 am]

BILLING CODE 6560-50-P

Complete official Federal Register PDF

Setzen Sie Ihre Recherche in ChatGPT oder Claude fort

Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.