Federal Register final rules — 1996-04-30

issue-1996-04-30Federal Register final rules — 1996-04-30Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-10701 Temporary Establishment of Class D Airspace; Anchorage International Airport, Alaska (AK)
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 19152-19153]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10701]

[[Page 19151]]

_______________________________________________________________________

Part IV

Department of Transportation

_______________________________________________________________________

Federal Aviation Administration

_______________________________________________________________________

14 CFR Part 71

Temporary Establishment of Class D Airspace; Anchorage International 
Airport, Alaska; Final Rule

Federal Register / Vol. 61, No. 84 / Tuesday, April 30, 1996 / Rules 
and Regulations

[[Page 19152]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 71

[Airspace Docket No. 96-AAL-1]

Temporary Establishment of Class D Airspace; Anchorage 
International Airport, Alaska (AK)

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action establishes a temporary Class D airspace area east 
of the Anchorage International Airport, AK, while Runway 14/32 is 
closed for construction. During this closure, heavy or large commercial 
aircraft will be departing to the east from Runway 06L/06R or arriving 
from the east to land on Runway 24L/24R. The intended effect of this 
action is to enhance safety by reducing the possibility of small 
general aviation aircraft encountering wake turbulence from, or 
conflicting with, heavy or large aircraft departing or arriving 
Anchorage International Airport.

DATES: Effective date: 0901 UTC, May 1, 1996. Expiration Date: 0901 
UTC, July 16, 1996.

FOR FURTHER INFORMATION CONTACT:
 Robert C. Durand, System Management Branch, AAL-530, Air Traffic 
Division, Federal Aviation Administration, 222 West 7th Avenue #14, 
Anchorage, AK 99513-7587; telephone number: (907) 271-5898.

SUPPLEMENTARY INFORMATION:

Background

    Normally, heavy or large aircraft depart on Runway 32 to the north 
and arrive on Runway 06 from the west at Anchorage International 
Airport. The Anchorage International Airport Manager has informed the 
Federal Aviation Administration (FAA) that starting in May 1996, Runway 
14/32 will be closed for construction through the middle of July 1996. 
This closure will necessitate that heavy or large aircraft operating to 
or from Anchorage International Airport arrive from or depart to the 
east. Part of this airspace is a transition area used by small general 
aviation aircraft operating under visual flight rules (VFR) to or from 
Lake Hood, Merrill Field, and Anchorage International airports. The FAA 
has received letters from the National Transportation Safety Board, Air 
Transport Association of America, Federal Express, and Northwest 
Airlines, expressing concerns, specifically, about heavy jet departures 
off Runway 06 conflicting with VFR traffic east of Anchorage 
International Airport.

The Rule

    This amendment to part 71 of the Federal Aviation Regulations 
establishes a Temporary Class D airspace area from the surface to 4,100 
feet mean sea level (MSL) east of Anchorage International Airport, AK 
(see appendix). Pilots operating in this airspace will be required to 
be in radio contact with Anchorage Radar Approach Control air traffic 
controllers. These aircraft will be provided safety alerts and wake 
turbulence advisories. Additionally, controllers will provide 
separation services between special VFR operations and aircraft 
executing instrument approach procedures to the Anchorage International 
Airport. This action is intended to enhance safety by reducing the 
possibility of small general aviation aircraft encountering wake 
turbulence from, or conflicting with, heavy or large aircraft departing 
or arriving Anchorage International Airport.
    Because the circumstances described in this final rule warrant 
immediate action by the FAA to maintain the safety of flight, the FAA 
concludes that notice and public procedure under 5 U.S.C. section 
553(b) are impracticable and good cause, pursuant to 5 U.S.C. section 
553(d), exists for making this amendment effective in less than 30 
days.
    The coordinates for this airspace docket are based on North 
American Datum 83. Class D airspace area designations are published in 
paragraph 5000 of FAA Order 7400.9C dated August 17, 1995, and 
effective September 16, 1995, which is incorporated by reference in 14 
CFR 71.1. This Class D airspace area listed in this document will be 
published subsequently in the Order.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this regulation--(1) is not a ``significant regulatory 
action'' under Executive Order 12866; (2) is not a ``significant rule'' 
under DOT Regulatory Policies and Procedures (44 FR 11034; February 26, 
1979); and (3) does not warrant preparation of a Regulatory Evaluation 
as the anticipated impact is minimal. Since this is a routine matter 
that will only affect air traffic procedures and air navigation, it is 
certified that this rule will not have a significant economic impact on 
a substantial number of small entities under the criteria of the 
Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (Air).

Adoption of the Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration amends 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 5000--Class D Airspace

* * * * *

AAL AK D Temporary Anchorage, AK [New]

    That airspace extending upward from the surface to and including 
4,100 feet MSL within a line beginning at the intersection of the 
New Seward Highway and O'Malley Road, at lat. 61 deg.07'23'' N; 
long. 149 deg.51'23'' W; thence east to the intersection of O'Malley 
Road and Lake Otis Park Way at lat. 61 deg.07'23'' N; long 
149 deg.50'03'' W; thence north to the intersection of Lake Otis 
Park Way and Abbott Road at lat. 61 deg.08'14'' N; long. 
149 deg.50'03'' W; thence east to the intersection of Abbott Road 
and Abbott Loop Road at lat. 61 deg.08'14'' N; long. 149 deg.48'16'' 
W; thence due north to Tudor Road at lat. 61'10'51'' N; long. 
149 deg.48'16'' W; thence west to the intersection of Tudor Road and 
New Seward Highway at lat. 61 deg.10'51'' N; long. 149 deg.51'38'' 
W; thence south along the New Seward Highway to the point of 
beginning.
* * * * *
    Issued in Washington, D.C. April 24, 1996.
Harold W. Becker,
Acting Program Director for Air Traffic Airspace Management.

    Note: This appendix will not appear in the Code of Federal 
Regulations.

Appendix--Temporary Establishment of Class D Airspace; Anchorage 
International Airport, Alaska (AK)

BILLING CODE 4910-13-M

[[Page 19153]]

[GRAPHIC] [TIFF OMITTED] TR30AP96.001

[FR Doc. 96-10701 Filed 4-25-96; 4:29 pm]
BILLING CODE 4910-13-C

Complete official Federal Register PDF

FR Doc. 96-10677 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18942-18944]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10677]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28548; Amdt. No. 1724]

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of the 
adoption of new or revised criteria, or because of changes occurring in 
the National Airspace System, such as the commissioning of new 
navigational facilities, addition of new obstacles, or changes in air 
traffic requirements. These changes are designed to provide safe and 
efficient use of the navigable airspace and to promote safe flight 
operations under instrument flight rules at the affected airports.

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference-approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matters incorporated by reference in the 
amendment is as follows:
    For Examination--1. FAA Rules Docket, FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which the affected 
airport is located; or
    3. The Flight Inspection Area Office which originated the SIAP.
    For Purchase--Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or

[[Page 18943]]

    2. The FAA Regional Office of the region in which the affected 
airport is located.
    By Subscription--Copies of all SIAPs, mailed once every 2 weeks, 
are for sale by the Superintendent of Documents, U.S. Government 
Printing Office, Washington, DC 20402.

FOR FURTHER INFORMATION CONTACT: Paul J. Best, Flight Procedures 
Standards Branch (AFS-420), Technical Programs Division, Flight 
Standards Service, Federal Aviation Administration, 800 Independence 
Avenue, SW., Washington, DC 20591; telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description of each SIAP is contained in official FAA form 
documents which are incorporated by reference in this amendment under 5 
U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the Federal Aviation 
Regulations (FAR). The applicable FAA Forms are identified as AA Forms 
8260-3, 8260-4, and 8260-5. Materials incorporated by reference are 
available for examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction on charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.

The Rule

    This amendment to part 97 is effective upon publication of each 
separate SIAP as contained in the transmittal. Some SIAP amendments may 
have been previously issued by the FAA in a National Flight Data Center 
(FDC) Notice to Airmen (NOTAM) as an emergency action of immediate 
flight safety relating directly to published aeronautical charts. The 
circumstances which created the need for some SIAP amendments may 
require making them effective in less than 30 days. For the remaining 
SIAPs, an effective date at least 30 days after publication is 
provided.
    Further, the SIAPs contained in this amendment are based on the 
criteria contained in the U.S. Standard for Terminal Instrument 
Approach Procedures (TERPS). In developing these SIAPs, the TERPS 
criteria were applied to the conditions existing or anticipated at the 
affected airports. Because of the close and immediate relationship 
between these SIAPs and safety in air commerce, I find that notice and 
public procedure before adopting these SIAPs are impracticable and 
contrary to the public interest and, where applicable, that good cause 
exists for making some SIAPs effective in less than 30 days.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air Traffic Control, Airports, Navigation (Air).

    Issued in Washington, DC on April 19, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120, 44701; and 14 
CFR 11.49(b)(2).

    2. Part 97 is amended to read as follows:

Secs. 97.23, 97.25, 97.27, 97.29, 97.31, 97.33 and 97.35  [Amended]

    By amending: Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME or 
TACAN; Sec. 97.25 LOC, LOC/DME, LDA, LDA/DME, SDF, SDF/DME; Sec. 97.27 
NDB, NDB/DME; Sec. 97.29 ILS, ILS/DME, ISMLS, MLS, MLS/DME, MLS/RNAV; 
Sec. 97.31 RADAR SIAPs; Sec. 97.33 RNAV SIAPs; and Sec. 97.35 COPTER 
SIAPs, identified as follows:

* * * Effective May 23, 1996

Manchester, NH, Manchester, LOC RWY 17, Orig Liberty, TX Liberty 
Muni, GPS RWY 16, Orig

* * * Effective June 20, 1996

Selma, AL, Craig Field, VOR RWY 15, Orig
Selma, AL, Craig Field, VOR RWY 33, Orig
Selma, AL, Craig Field, VOR RWY 32, Amdt 3, CANCELLED
Koyuk, AK, Koyuk, NDB/DME RWY 36, Orig
St Paul Island, AK, St Paul Island, NDB/DME or GPS RWY 18, Amdt 2
St Paul Island, AK, St Paul Island, NDB-A, Orig
St Paul Island, AK, St Paul Island, NDB-3 or GPS RWY 36, Amdt 1, 
CANCELLED
 Tucson, AZ, Tucson Intl, ILS RWY 11L, Amdt 12
Lompoc, CA, Lompoc, NDB or GPS-B, Orig, CANCELLED
Rio Vista, CA, Rio Vista Muni, GPS RWY 25, Orig
Santa Monica, CA, Santa Monica Muni, LDA/DME RWY 21, Amdt 1, 
CANCELLED
Bridgeport, CT, Igor I. Sikorsky Memorial, GSP RWY 29, Amdt 1
Jekyll Island, GA, Jekyll Island, GPS RWY 36, Orig
Great Barrington, MA, Great Barrington, NDB or GPS-A, Amdt 5
Great Barrington, MA, Great Barrington, GPS RWY 11, Orig
Aitkin, MN, Aitkin Muni, NDB or GPS RWY 16, Amdt 4
Brainerd, MN, Brainerd-Crow Wing Co Regional, VOR/DME RWY 12, Amdt 9
Brainerd, MN, Brainerd-Crow Wing Co Regional, VOR or GPA RWY 30, 
Amdt 13
Brainerd, MN, Brainerd-Crow Wing Co Regional, NDB or GPS RWY 23, 
Amdt 5
Brainerd, MN, Brainerd-Crow Wing Co Regional, ILS RWY 23, Amdt 5
Little Falls, MN, Little Falls-Morrison County, NDB or GPS RWY 30, 
Amdt 5
Mora, MN, Mora Muni, NDB or GPS RWY 35, Amdt 3
Corinth, MS, Roscoe Turner, GPS RWY 17, Orig
Reno, NV, Reno/Tahoe Intl, LOC-2 RWY 16R, Amdt 6
Southport, NC, Brunswick County, NDB or GPS-A, AMDT 3B, CANCELLED
Fargo, ND, Hector International, RADAR-1, Amdt 10
Gage, OK, Gage, VOR or GPS-A, Amdt 9A, CANCELLED
Miami, OK, Miami Muni, NDB or GPS RWY 17, Amdt 1, CANCELLED
Abilene, TX, Abilene Regional, RADAR-1, Amdt 8
Angleton/Lake Jackson, TX, Brazoria County, GPS RWY 35, Orig

[[Page 18944]]

Ballinger, TX, Bruce Field, GPS RWY 35, Orig
Conroe, TX, Montgomery County, GPS RWY 32, Orig
Fort Stockton, TX, Fort Stockton-Pecos County, GPS RWY 30, Orig
Hereford, TX, Hereford Muni, GPS RWY 21, Orig
Houston, TX, Houston Gulf, GPS RWY 31, Orig
Livingston, TX, Livingston Muni, GPS RWY 30, Orig
Monahans, TX, Roy Hurd Memorial, GPS RWY 12, Orig
Monahans, TX, Roy Hurd Memorial, GPS RWY 30, Orig
Ozona, TX, Ozona Muni, GPS RWY 16, Orig
Palestime, TX, Palestine Muni, GPS RWY 35, Orig
Hayward, WI, Hayward Muni, VOR RWY 20, Amdt 6
Hayward, WI, Hayward Muni, VOR/DME or GPS RWY 2, Amdt 1
Hayward, WI, Hayward Muni, NDB or GPS RWY 20, Amdt 12

    The FAA published an amendment in Docket No. 28475, Amdt. No. 1712 
to Part 97 of the Federal Aviation Regulations, Vol 61, FR No. Page 
7698, dated February 29, 1996, Section 97.23 effective April 25, 1996, 
which is amended as follows:

Kokomo, IN, Kokomo Muni, VOR/DME or GPS RWY 23, Amdt 19 is amended 
to read:
Kokomo, IN, Kokomo Muni, VOR or GPS RWY 23, Amdt 19
[FR Doc. 96-10677 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-10676 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18941-18942]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10676]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28549; Amdt. No. 1725]

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of 
changes occurring in the National Airspace System, such as the 
commissioning of new navigational facilities, addition of new 
obstacles, or changes in air traffic requirements. These changes are 
designed to provide safe and efficient use of the navigable airspace 
and to promote safe flight operations under instrument flight rules at 
the affected airports.

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference-approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matter incorporated by reference in the 
amendment is as follows:
    For Examination--1. FAA Rules Docket, FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which affected airport 
is located; or
    3. The Flight Inspection Area Office which originated the SIAP.
    For Purchase--Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or
    2. The FAA Regional Office of the region in which the affected 
airport is located.
    By Subscription--Copies of all SIAPs, mailed once every 2 weeks, 
are for sale by the Superintendent of Documents, US Government Printing 
Office, Washington, DC 20402.

FOR FURTHER INFORMATION CONTACT:
Paul J. Best, Flight Procedures Standards Branch (AFS-420), Technical 
Programs Division, Flight Standards Service, Federal Aviation 
Administration, 800 Independence Avenue, SW., Washington, DC 20591; 
telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description on each SIAP is contained in the appropriate FAA 
Form 8260 and the National Flight Data Center (FDC)/Permanent (P) 
Notices to Airmen (NOTAM) which are incorporated by reference in the 
amendment under 5 U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the 
Federal Aviation Regulations (FAR). Materials incorporated by reference 
are available for examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction of charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.

The Rule

    This amendment to part 97 of the Federal Aviation Regulations (14 
CFR part 97) establishes, amends, suspends, or revokes SIAPs. For 
safety and timeliness of change considerations, this amendment 
incorporates only specific changes contained in the content of the 
following FDC/P NOTAM for each SIAP. The SIAP information in some 
previously designated FDC/Temporary (FDC/T) NOTAMs is of such duration 
as to be permanent.With conversion to FDC/P NOTAMs, the respective FDC/
T NOTAMs have been cancelled.
    The FDC/P NOTAMs for the SIAPs contained in this amendment are 
based on the criteria contained in the U.S. Standard for Terminal 
Instrument Approach Procedures (TERPS). In developing these chart 
changes to SIAPs by FDC/P NOTAMs, the TERPS criteria were applied to 
only these specific conditions existing at the affecting airports. All 
SIAP amendments in this rule have been previously issued by the FAA in 
a National Flight Data Center (FDC) Notice to Airmen (NOTAM) as an 
emergency action of immediate flight safety relating directly to 
published aeronautical charts. The circumstances which created the need 
for all these SIAP amendments requires making them effective in less 
than 30 days.
    Further, the SIAPs contained in this amendment are based on the 
criteria contained in the TERPS. Because of the close and immediate 
relationship between these SIAPs and safety in air commerce, I find 
that notice and public procedure before adopting these SIAPs are 
impracticable and contrary to the public interest and, where 
applicable, that good cause exists for making these SIAPs effective in 
less than 30 days.

Conclusion

    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air Traffic Control, Airports, Navigation (Air).

    Issued in Washington, DC on April 19, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 (CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

[[Page 18942]]

    Authority: 49 U.S.C. 40103, 40113, 40120, 44701; 49 U.S.C. 
106(g); and 14 CFR 11.49(b)(2).

    2. Part 97 is amended to read as follows:

Sec. Sec. 97.23, 97.25, 97.27, 97.29, 97.31, 97.33, 97.35   [Amended]

    By amending Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME or 
TACAN; Sec. 97.25 LOC, LOC/DME, LDA, LDA/DME, SDF, SDF/DME; Sec. 97.27 
NDB, NDB/DME; Sec. 97.29 ILS, ILS/DME, ISMLS, MLS, MLS/DME, MLS/RNAV; 
Sec. 97.31 RADAR SIAPs; Sec. 97.33 RNAV SIAPs; and Sec. 97.35 COPTER 
SIAPs, Identified as follows:

                                                               Effective upon Publication                                                               
--------------------------------------------------------------------------------------------------------------------------------------------------------
      FDC Date             State                City                  Airport                    FDC Number                           SIAP              
--------------------------------------------------------------------------------------------------------------------------------------------------------
04/03/96............  OK               Pauls Valley..........  Pauls Valley Muni....  FDC 6/2009                        GPS Rwy 35 Orig...              
04/04/96............  LA               Alexandria............  Alexandria Intl......  FDC 6/2028                        VOR or GPS Rwy 32, Orig...      
04/04/96............  OK               Pauls Valley..........  Pauls Valley Muni....  FDC 6/2026                        NDB Rwy 35, Amdt 3...           
04/04/96............  TN               Tullahoma.............  Tullahoma Regional/WM  FDC 6/2043                        VOR/DME or GPS-B, Amdt 3A...    
                                                                Northern Field.                                                                         
04/04/96............  TN               Tullahoma.............  Tullahoma Regional/WM  FDC 6/2045                        SDF Rwy 18, Amdt 3...           
                                                                Northern Field.                                                                         
04/05/96............  AR               Texarkana.............  Texarkana Regional-    FDC 6/2075                        VOR or GPS Rwy 13, Amdt 14...   
                                                                Webb Field.                                                                             
04/05/96............  AR               Texarkana.............  Texarkana Regional-    FDC 6/2078                        ILS Rwy 22, Amdt 14...          
                                                                Webb Field.                                                                             
04/05/96............  AR               Texarkana.............  Texarkana Regional-    FDC 6/2082                        NDB or GPS Rwy 22, Amdt 11...   
                                                                Webb Field.                                                                             
04/05/96............  AR               Texarkana.............  Texarkana Regional-    FDC 6/2084                        LOC BC Rwy 4, Amdt 11...        
                                                                Webb Field.                                                                             
04/08/96............  KS               Wichita...............  Wichita Mid-Continent  FDC 6/2116                        ILS Rwy 1R, Amdt 16...          
                                                                Airport.                                                                                
04/09/96............  VA               Petersburg............  Petersburg Muni......  FDC 6/2128                        LOC Rwy 5 Orig...               
04/09/96............  VA               Petersburg............  Petersburg Muni......  FDC 6/2130                        NDB or GPS Rwy 5 Amdt 4...      
04/09/96............  VA               Petersburg............  Petersburg Muni......  FDC 6/2132                        VOR or GPS Rwy 23 Amdt 3...     
04/15/96............  NE               Alliance..............  Alliance Muni........  FDC 6/2236                        VOR or GPS Rwy 12, Amdt 2...    
04/15/96............  TX               College Station.......  Easterwood Field.....  FDC 6/2223                        DEP PROC/TKOF MNMS, Orig...     
04/15/96............  TX               College Station.......  Easterwood Field.....  FDC 6/2224                        ILS Rwy 34, Amdt 10...          
04/15/96............  TX               College Station.......  Easterwood Field.....  FDC 6/2225                        LOC BC Rwy 16, Amdt 4...        
04/15/96............  TX               College Station.......  Easterwood Field.....  FDC 6/2226                        NDB or GPS Rwy 34, Amdt 11...   
04/15/96............  TX               College Station.......  Easterwood Field.....  FDC 6/2227                        VOR/DME or GPS Rwy 28, Amdt     
                                                                                                                         12...                          
04/15/96............  TX               College Station.......  Easterwood Field.....  FDC 6/2228                        VOR or TACAN or GPS Rwy 10, Amdt
                                                                                                                         18...                          
--------------------------------------------------------------------------------------------------------------------------------------------------------

[FR Doc. 96-10676 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-10673 Special Conditions; Cessna Model 425 Airplanes
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18939-18941]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10673]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 84 / Tuesday, April 30, 1996 / Rules 
and Regulations

[[Page 18939]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 23

[Docket No. 131CE, Special Condition 23-ACE-86]

Special Conditions; Cessna Model 425 Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final special conditions; request for comments.

-----------------------------------------------------------------------

SUMMARY: These special conditions are issued for the Cessna Model 425 
airplanes modified by Modern Avionics, Inc., Eden Prairie, Minnesota. 
These airplanes will have novel and unusual design features when 
compared to the state of technology envisaged in the applicable 
airworthiness standards. These novel and unusual design features 
include the installation of electronic displays for which the 
applicable regulations do not contain adequate or appropriate 
airworthiness standards for the protection of these systems from the 
effects of high intensity radiated fields (HIRF). These special 
conditions contain the additional safety standards that the 
Administrator considers necessary to establish a level of safety 
equivalent to the airworthiness standards applicable to these 
airplanes.

EFFECTIVE DATE: The effective date of these special conditions is on 
publication in the Federal Register. Comments must be received on or 
before May 30, 1996.

ADDRESSES: Comments may be mailed in duplicate to: Federal Aviation 
Administration, Office of the Assistant Chief Counsel, ACE-7, 
Attention: Rules Docket Clerk, Docket No. 131CE, Room 1558, 601 East 
12th Street, Kansas City, Missouri 64106. All comments must be marked: 
Docket No. 131CE. Comments may be inspected in the Rules Docket 
weekdays, except Federal holidays, between 7:30 a.m. and 4:00 p.m.

FOR FURTHER INFORMATION CONTACT:
Ervin Dvorak, Aerospace Engineer, Standards Office (ACE-110), Small 
Airplane Directorate, Aircraft Certification Service, Federal Aviation 
Administration, 601 East 12th Street, Kansas City, Missouri 64106; 
telephone (816) 426-6941.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Although this action is in the form of a final rule that involves 
requirements affecting flight safety, and, thus, was not preceded by 
notice and an opportunity for public comment, comments are invited on 
these special conditions.
    Interested persons are invited to submit such written data, views, 
or arguments as they may desire. Communications should identify the 
regulatory docket and special conditions number and be submitted in 
duplicate to the address specified above. All communications received 
on or before the closing date for comments will be considered by the 
Administrator. These special conditions may be changed in light of the 
comments received. All comments submitted will be available in the 
rules docket for examination by interested parties, both before and 
after the closing date for comments. A report summarizing each 
substantive public contact with FAA personnel concerning this 
rulemaking will be filed in the docket. Persons wishing the FAA to 
acknowledge receipt of their comments, submitted in response to this 
request, must include a self-addressed and stamped postcard on which 
the following statement is made: ``Comments to Docket No. 131CE.'' The 
postcard will be date stamped and returned to the commenter.

Background

    On March 8, 1996, Modern Avionics, Inc., 10000 Flying Cloud Drive, 
Eden Prairie, Minnesota 55347, made an application to the FAA for a 
supplemental type certificate (STC) for the Cessna Model 425 airplanes. 
The proposed modification incorporates a novel or unusual design 
feature, such as digital avionics consisting of an electronic flight 
instrument system (EFIS), that is vulnerable to HIRF external to the 
airplane.

Type Certification Basis

    The type certification basis for the Cessna Model 425 Airplanes is 
given in Type Certification Data Sheet No. A7CE plus the following:
    Sec. 23.1301 of Amendment 23-20; Secs. 23.1309, 23.1311, and 
23.1321 of Amendment 23-41; and Sec. 23.1322 of Amendment 23-43; 
exemptions, if any; and the special conditions adopted by this 
rulemaking action.

Discussion

    The FAA may issue and amend special conditions, as necessary, as 
part of the type certification basis if the Administrator finds that 
the airworthiness standards, designed according to Sec. 21.101(b), do 
not contain adequate or appropriate safety standards because of novel 
or unusual design features of an airplane. Special conditions are 
prescribed under the provisions of Sec. 21.16 to establish a level of 
safety equivalent to that established in the regulations. Special 
conditions are normally issued according to Sec. 11.49, effective 
October 25, 1989, after public notice, as required by Secs. 11.28 and 
11.29(b), and become a part of the type certification basis in 
accordance with Sec. 21.101(b)(2).
    Modern Avionics, Inc., plans to incorporate certain novel and 
unusual design features into an airplane for which the airworthiness 
standards do not contain adequate or appropriate safety standards for 
protection from the effects of HIRF. These features include electronic 
systems, which are susceptible to the HIRF environment, that were not 
envisaged by the existing regulations for this type of airplane.
    Protection of Systems from High Intensity Radiated Fields (HIRF): 
Recent advances in technology have given rise to the application in 
aircraft designs of advanced electrical and electronic systems that 
perform functions required for continued safe flight and landing. Due 
to the use of sensitive solid state advanced components in analog and 
digital electronics circuits, these advanced systems are readily 
responsive to the transient effects of induced electrical current and 
voltage caused by the HIRF. The HIRF can degrade electronic systems 
performance by damaging components or upsetting system functions.
    Furthermore, the HIRF environment has undergone a transformation 
that was

[[Page 18940]]

not foreseen when the current requirements were developed. Higher 
energy levels are radiated from transmitters that are used for radar, 
radio, and television. Also, the number of transmitters has increased 
significantly. There is also uncertainty concerning the effectiveness 
of airframe shielding for HIRF. Furthermore, coupling to cockpit-
installed equipment through the cockpit window apertures is undefined.
    The combined effect of the technological advances in airplane 
design and the changing environment has resulted in an increased level 
of vulnerability of electrical and electronic systems required for the 
continued safe flight and landing of the airplane. Effective measures 
against the effects of exposure to HIRF must be provided by the design 
and installation of these systems. The accepted maximum energy levels 
in which civilian airplane system installations must be capable of 
operating safely are based on surveys and analysis of existing radio 
frequency emitters. These special conditions require that the airplane 
be evaluated under these energy levels for the protection of the 
electronic system and its associated wiring harness. These external 
threat levels, which are lower than previous required values, are 
believed to represent the worst case to which an airplane would be 
exposed in the operating environment.
    These special conditions require qualification of systems that 
perform critical functions, as installed in aircraft, to the defined 
HIRF environment in paragraph 1 or, as an option to a fixed value using 
laboratory tests, in paragraph 2, as follows:
    (1) The applicant may demonstrate that the operation and 
operational capability of the installed electrical and electronic 
systems that perform critical functions are not adversely affected when 
the aircraft is exposed to the HIRF environment defined below:

                       Field Strength Volts/Meter                       
------------------------------------------------------------------------
                       Frequency                          Peak   Average
------------------------------------------------------------------------
10-100 KHz............................................       50       50
100-500...............................................       60       60
500-2000..............................................       70       70
2-30 MHz..............................................      200      200
30-70.................................................       30       30
70-100................................................       30       30
100-200...............................................      150       33
200-400...............................................       70       70
400-700...............................................     4020      935
700-1000..............................................     1700      170
1-2 GHz...............................................     5000      990
2-4...................................................     6680      840
4-6...................................................     6850      310
6-8...................................................     3600      670
8-12..................................................     3500     1270
12-18.................................................     3500      360
18-40.................................................     2100      750
------------------------------------------------------------------------

or,
    (2) The applicant may demonstrate by a system test and analysis 
that the electrical electronic systems that perform critical functions 
can withstand a minimum threat of 100 volts per meter, peak electrical 
field strength, from 10 KHz to 18 GHz. When using this test to show 
compliance with the HIRF requirements, no credit is given for signal 
attenuation due to installation.
    A preliminary hazard analysis must be performed by the applicant, 
for approval by the FAA, to identify electrical and/or electronic 
systems that perform critical functions. The term ``critical'' means 
those functions whose failure would contribute to, or cause, a failure 
condition that would prevent the continued safe flight and landing of 
the airplane. The systems identified by the hazard analysis that 
perform critical functions are candidates for the application of HIRF 
requirements. A system may perform both critical and non-critical 
functions. Primary electronic flight display systems, and their 
associated components, perform critical functions such as attitude, 
altitude, and airspeed indication. The HIRF requirements apply only to 
critical functions.
    Compliance with HIRF requirements may be demonstrated by tests, 
analysis, models, similarity with existing systems, or any combination 
of these. Service experience alone is not acceptable since normal 
flight operations may not include an exposure to the HIRF environment. 
Reliance on a system with similar design features for redundancy as a 
means of protection against the effects of external HIRF is generally 
insufficient since all elements of a redundant system are likely to be 
exposed to the fields concurrently.

Conclusion

    In view of the design features discussed for the Cessna Model 425 
Airplanes, the following special conditions are issued. This action is 
not a rule of general applicability and affects only those applicants 
who apply to the FAA for approval of these features on these airplanes.
    The substance of these special conditions has been subject to the 
notice and public comment procedure in several prior rulemaking 
actions. For example, the Dornier 228-200 (53 FR 14782, April 26, 
1988), the Cessna Model 525 (56 FR 49396, September 30, 1991), and the 
Beech Models 200, A200, and B200 airplanes (57 FR 1220, January 13, 
1992). It is unlikely that additional public comment would result in 
any significant change from those special conditions already issued and 
commented on. For these reasons, and because a delay would 
significantly affect the applicant's installation of the system and 
certification of the airplane, which is imminent, the FAA has 
determined that prior public notice and comment are unnecessary and 
impracticable, and good cause exists for adopting these special 
conditions without notice. Therefore, these special conditions are 
being made effective upon publication in the Federal Register. However, 
as previously indicated, interested persons are invited to comment on 
these special conditions if they so desire

List of Subjects in 14 CFR Part 23

    Aircraft, Aviation safety, Signs and symbols.

Citation

    The authority citation for these special conditions is as follows:

    Authority: 49 U.S.C. 106(g); 40113, 44701, 44702, and 44704; 14 
CFR 21.16 and 21.101; and 14 CFR 11.28 and 11.49.

 Adoption of Special Conditions

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the following special conditions are issued as part of 
the type certification basis for the modified Cessna Model 425 
Airplanes:
    1. Protection of Electrical and Electronic Systems from High 
Intensity Radiated Fields (HIRF). Each system that performs critical 
functions must be designed and installed to ensure that the operations, 
and operational capabilities of these systems to perform critical 
functions, are not adversely affected when the airplane is exposed to 
high intensity radiated electromagnetic fields external to the 
airplane.
    2. For the purpose of these special conditions, the following 
definition applies: Critical Functions: Functions whose failure would 
contribute to, or cause, a failure condition that would prevent the 
continued safe flight and landing of the airplane.

[[Page 18941]]

    Issued in Kansas City, Missouri on April 15, 1996.
Henry A. Armstrong,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-10673 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-10663 Foreign Fishing; Pacific Coast Groundfish Fishery; Annual Specifications; and Correction
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18988-18994]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10663]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Parts 611 and 663

[Docket No. 951227306-6117-02; I.D. 121295C]

Foreign Fishing; Pacific Coast Groundfish Fishery; Annual 
Specifications; and Correction

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Final 1996 groundfish fishery specifications for Pacific 
whiting and correction.

-----------------------------------------------------------------------

SUMMARY: NMFS announces the 1996 fishery specifications for Pacific 
whiting in the U.S. exclusive economic zone (EEZ) and state waters off 
the coasts of Washington, Oregon, and California as authorized by the 
Pacific Coast Groundfish Fishery Management Plan (FMP). The 
specifications include the level of the acceptable biological catch 
(ABC) and harvest guideline, including the distribution between 
domestic and foreign fishing operations. The intended effect of this 
action is to establish allowable harvest levels of Pacific whiting 
based on the best available scientific information. Corrections are 
also made to Table 1 in the annual specifications and management 
measures for the Pacific coast groundfish fishery.

EFFECTIVE DATE: May 15, 1996, until the effective date of the 1997 
annual specifications and management measures, which will be published 
in the Federal Register.

FOR FURTHER INFORMATION CONTACT: William L. Robinson (Northwest Region, 
NMFS) 206-526-6140; or Rodney R. McInnis (Southwest Region, NMFS) 310-
980-4040.

SUPPLEMENTARY INFORMATION: The FMP requires that fishery specifications 
for groundfish be evaluated each calendar year, that harvest guidelines 
or quotas be specified for species or species groups in need of 
additional protection, and that management measures designed to achieve 
the harvest guidelines or quotas be published in the Federal Register 
and made effective by January 1, the beginning of the fishing year. 
This was done for the 1996 groundfish fishery (61 FR 279, January 4, 
1996), with one exception, Pacific whiting (whiting). Final 
specifications for whiting were not announced because the Pacific 
Fishery Management Council (Council), which makes management 
recommendations to NMFS, decided to delay its consideration until 1995 
hydroacoustic survey information could be included in the assessment on 
whiting and the new results reviewed. Consequently, preliminary 
specifications for whiting were announced concurrent with the final 
specifications for other groundfish species. As in the past, the 
specifications include fish caught in state ocean waters (0-3 nautical 
miles (nm) offshore) as well as fish caught in the EEZ (3-200 nm 
offshore).
    In 1994, the ABC for whiting was substantially higher than in 
previous years, primarily because it was based on data from the 1992 
hydroacoustic survey that utilized new, more sensitive equipment, and 
extended farther offshore and farther north to encompass the species' 
range. To provide for cautious exploitation until the 1992 survey 
results could be confirmed, a conservative harvest rate policy was 
adopted in 1994 and 1995 to minimize the risk to the resource if the 
ABC is later found to be too high. Because initial results of the 
recent 1995 survey were favorable, the Council initially supported 
resumption of the moderate exploitation rate in 1996. When applied to 
the previous year's stock assessment, this resulted in a preliminary 
ABC recommendation of 123,000 metric tons (mt) for the U.S. and Canada 
combined. The Council also recommended that the preliminary U.S. 
harvest guideline continue at 80 percent (98,400 mt) of the ABC. When 
the preliminary specifications were announced, NMFS indicated that the 
final specifications could be higher or lower, depending on the 
information resulting from the new survey and stock assessment on 
whiting.
    At its March 1996 meeting in Portland, OR, the Council reviewed the 
new stock assessment, which indicated that the biomass of 3-year-old 
whiting was 60 percent greater than expected, and that a moderate 
abundance of 2-year-old fish will be recruited to the fishery in 1996. 
However, the Council recommended delaying the return to the moderate 
exploitation rate until resolution of new questions concerning the 
correct hydroacoustic target strength used in estimating biomass. The 
target strength calibrates the hydroacoustic survey data into absolute 
biomass of whiting. Even so, by applying the conservative exploitation 
rate to the new stock assessment, the Council's final ABC 
recommendation (U.S. and Canadian combined) of 265,000 mt is 42,000 mt 
higher than the 1995 ABC of 223,000 mt and more than double the 
preliminary ABC of 123,000 mt. (Under the new stock assessment, a 
moderate exploitation rate would have led to a 1996 ABC of 369,000 mt.)
    The Council also confirmed its preliminary recommendation to set 
the U.S. harvest guideline at 80 percent of the U.S.-Canadian ABC. 
Therefore, the final U.S. harvest guideline is 212,000 mt for 1996. If 
Canada adopts the same ABC and calculates its share as 30 percent of 
the total catch, as in the recent past, the U.S.-Canadian ABC will be 
exceeded by about 14 percent. These overages have not caused a 
biological problem, particularly given the large increase in the ABC in 
1994 and use of the conservative exploitation rate in 1994-96. The 
total harvest will not reach the overfishing level. Bilateral 
discussions with Canada are expected to continue.
    The whiting harvest guideline in 1996 is designated entirely for 
domestic harvesting and processing, and there is no surplus for joint 
venture or foreign fishing operations.
    Public comments on the preliminary whiting specifications were 
requested through February 5, 1996, but none were received. Whiting 
caught in 1996

[[Page 18989]]

before the effective date of this action will be counted toward the new 
harvest guideline.

Other Changes to the Whiting Fishery

    The start of the regular whiting season north of 42 deg. N. lat. is 
changed from April 15 to May 15 (61 FR 16402, April 15, 1996). In 
addition, NMFS has proposed a framework regulation for implementing the 
treaty rights of certain Washington State coastal treaty Indian tribes 
and presented options for an allocation to the Makah tribe in 1996 (61 
FR 10303, March 13, 1996). This proposal also appears in a separate 
Federal Register document, and is not yet approved. Other 
specifications and management measures announced at (61 FR 279, January 
4, 1996) or at 50 CFR part 663 are not changed by this action except as 
corrected.

Correction of Publication

    In the publication of the annual specifications and management 
measures on January 4, 1996 (I.D. 121295C), in the table on page 280, 
under ``roundfish,'' the entry for pacific whiting, under ``rockfish,'' 
the entries thornyheads, yellowtail, and the text of footnotes d and n 
at the end of the table are corrected as set forth. For the convenience 
of the user, the table is revised to include these changes to read as 
follows:
BILLING CODE 3510-22-W

[[Page 18990]]

[GRAPHIC] [TIFF OMITTED] TR30AP96.002

[[Page 18991]]

[GRAPHIC] [TIFF OMITTED] TR30AP96.003

[[Page 18992]]

[GRAPHIC] [TIFF OMITTED] TR30AP96.004

[[Page 18993]]

[GRAPHIC] [TIFF OMITTED] TR30AP96.005

BILLING CODE 3510-22-C

[[Page 18994]]

Classification

    The final specifications and management measures for 1996 are 
issued under the authority of the Magnuson Fishery Conservation and 
Management Act and are in accordance with 50 CFR parts 611 and 663, the 
regulations implementing the FMP.
    NMFS finds good cause, pursuant to 5 U.S.C. 553(d)(3), to waive a 
portion of the 30-day delay in effectiveness, so that this rule may 
become effective before the fishery begins on May 15, 1996. The initial 
whiting specifications were announced January 4, 1996 (61 FR 27), and 
explained clearly to the public that the harvest guideline might be 
adjusted later by notice in the Federal Register. This final rule is 
that notice. Since this action has been publicized widely through the 
Council process, the industry is aware of the increase and would be 
hurt if the final specifications were not effective on May 15. Since 
the at-sea processing sector is capable of taking its share of the 
harvest guideline within less than a month, delaying full releases of 
the harvest guideline may cause an unnecessary disruption in fishing. 
Therefore, it would be contrary to the public interest to delay the 
effectiveness of the rule beyond the start of the fishery.

    Dated: April 23, 1996.
Gary Matlock,
Program Management Officer, National Marine Fisheries Service.
[FR Doc. 96-10663 Filed 4-29-96; 8:45 am]
BILLING CODE 3510-22-W

Complete official Federal Register PDF

FR Doc. 96-10658 Drawbridge Operation Regulations; Manchester Harbor, MA
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18946-18948]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10658]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 117

[CGD01-96-035]
RIN 2115-AE47

Drawbridge Operation Regulations; Manchester Harbor, MA

AGENCY: Coast Guard, DOT.

ACTION: Temporary final rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is temporarily changing the operating rules 
that govern the Massachusetts Bay Transportation Authority (MBTA) 
Bridge at mile 1.0, in Manchester, Massachusetts. This change will 
require the bridge to be crewed for eight additional hours each day 
during the 1996 boating season and will modify the advance notice 
requirement for the 11 p.m. to 7 a.m. time period. This temporary final 
rule is based upon comments received as a result of a temporary 
deviation implemented by the Coast Guard during the 1994 boating season 
and a final temporary rule implemented for the 1995 boating season. The 
comments received from the mariners indicated their navigational needs 
require the bridge to be crewed from 7 a.m. to 11 p.m. during the 
boating season.

EFFECTIVE DATE: This temporary final rule is effective from May 27, 
1996, through September 30, 1996. Comments must be received on or 
before October 31, 1996.

ADDRESSES: Comments should be mailed to Commander (obr), First Coast 
Guard District, Captain John Foster Williams Federal Building, 408 
Atlantic Ave., Boston, Massachusetts 02110-3350. Comments also may be 
hand-delivered to room 628 at the same address between 6:30 a.m. and 3 
p.m., Monday through Friday, except federal holidays. The telephone 
number is (617) 223-8364. Comments will become part of this docket and 
will be available for inspection or copying at the above address.

FOR FURTHER INFORMATION CONTACT:
John W. McDonald, Project Officer, Bridge Branch, (617) 223-8364.

SUPPLEMENTARY INFORMATION:

Request for Comments

    Interested persons are invited to participate in this rulemaking by 
submitting written views, comments, data, or arguments. Persons 
submitting comments should include their names and addresses, identify 
this rulemaking (CGD01-95-052), the specific section of this rule to 
which each comment applies, and give reasons for each comment. The 
Coast Guard requests that all comments and attachments be submitted in 
an 8\1/2\'' x 11'' unbound format suitable for copying and electronic 
filing. If that is not practical, a second copy of any bound material 
is requested. Persons desiring acknowledgment that their comments have 
been received should enclose a stamped, self-addressed post card or 
envelope.
    The Coast Guard will consider all comments received during the 
comment period, and may change this proposal in light of comments 
received. The Coast Guard plans no public hearing. Persons may request 
a public hearing by writing to Commander (obr), First Coast Guard 
District at the address listed under ADDRESSES. The request should 
include reasons why a hearing would be beneficial. If it determines 
that the opportunity for oral presentations will aid this rulemaking, 
the Coast Guard will hold a public hearing at a time and place 
announced by a later notice in the Federal Register.
    In accordance with 5 U.S.C. 553(6) good cause exists for publishing 
a temporary final rule without a prior comment period. It is in the 
public interest to have a rule increasing the hours the bridge is 
operated in effect before the Memorial Day weekend, the beginning of 
the 1996 boating season. Delaying this rule to provide for a notice and 
comment period would be impracticable, unnecessary and contrary to the 
public interest. Due to the manner in which openings are conducted, a 
greater number of openings does not cause delays to the commuter trains 
using the bridge. The MBTA has been advised of the extra hours that the 
bridge will be required to be crewed during the 1996 boating season and 
the need for comprehensive record keeping. This test period will allow 
the Coast Guard to fully evaluate marine traffic patterns and costs to 
the MBTA. After this test period, the Coast Guard will evaluate the 
comments received and prepare a notice of proposed rulemaking to 
permanently change the operating schedule if appropriate.

Regulatory History

    On June 14, 1994, a temporary deviation effective during the 1994 
boating season from the operating regulations for the MBTA Bridge was 
published in the Federal Register (59 FR 30524; June 14, 1994). The 
Coast Guard received three letters and seven petitions. A public 
hearing was not requested and one was not held.
    On July 17, 1995, the Coast Guard implemented a temporary final 
rule (60 FR 36357; July 17, 1995) which was effective for the 1995 
boating season. The Coast Guard received 22 letters and three 
petitions. A public hearing was not requested and one was not held.

Background and Purpose

    The MBTA Bridge over Manchester Harbor has a vertical clearance of 
6' above mean high water (MHW) and 15' above mean low water (MLW). The 
existing operating regulations at 33 CFR 117.603 require that the 
bridge open on signal from 1 April through 1 November from 9 a.m. to 6 
p.m., with a one hour lunch closure between 1 p.m. and 2 p.m. daily.
    The Coast Guard received a request in May, 1994, from the 
Manchester Harbormaster/Chief of Police and several mariners located 
upstream of the bridge to extend the hours that the Manchester MBTA 
Bridge be required to open on signal during the peak boating season. On 
June 14, 1994, the Coast Guard published a temporary (90 day) deviation 
(59 FR 30524; June 14, 1994) from the operating regulations to evaluate 
changes to the operating rules during the 1994 boating season. The 
temporary deviation extend the hours that the bridge was crewed by an 
additional five hours a day, from June 3 through August 31, 1994. It 
required the bridge to be crewed from 8 a.m. to 9 p.m. daily and 
eliminated the one hour lunch hour closure from 1 p.m. to 2 p.m. each 
day.
    The Coast Guard received only one letter during the comment period 
that closed October 31, 1994. The MBTA, the bridge owner, opposed the 
proposal to extend the operating hours of the bridge. Their objection 
was based upon the

[[Page 18947]]

additional cost of $16,000 for crewing the bridge during the 1994 test 
period. The Coast Guard requested additional bridge log data from the 
MBTA to evaluate the impact of the deviation. The MBTA did not provide 
the requested data.
    The Coast Guard did not proceed with a permanent change to the 
regulations immediately after the temporary deviation expired since 
only one comment letter was received within the comment period. The 
mariners who originally requested the changes to the operating rules 
did not provide comments until March 15, 1995, well after the comment 
period for the temporary deviation ended. These comments included seven 
petition letters, one letter representing forty-five boat owners 
located upstream of the bridge at the Manchester Harbor Marina and one 
letter from the Manchester Harbormaster/Chief of Police. All these 
letters were in favor of increasing the operating hours for the bridge.
    During the summer of 1995, the Coast Guard implemented a temporary 
final rule (60 FR 36357; July 17, 1995) which tested an operating 
schedule from July 17, 1995, through September 30, 1995, which 
increased the period that the bridge opened on signal by three hours 
from 6 p.m. to 9 p.m. After the test period ended, the Coast Guard 
received 20 letters from mariners. Three petitions with a total of 40 
signatures, a letter from Manchester Harbor Marina, and a letter from 
the Manchester Harbor Boat Club with 200 members were received 
requesting that the operating rules be changed to require the bridge to 
open on signal from 7 a.m. to 11 p.m. each day, Memorial Day through 
the end of September. The mariners requested the extended bridge 
operating hours so that they could get underway at a reasonable time in 
the morning and also be able to return to their moorings in the evening 
after their evening racing or sailing. One letter requesting that the 
hours remain unchanged was received from the bridge owner, the MBTA. 
The MBTA objected to the extra operating hours based upon a $27,000 
additional cost to crew the bridge during the 1995 test period. As in 
1994, copies of the bridge logs were not submitted by the bridge owner 
as requested by the Coast Guard.
    The Coast Guard believes that there is good cause to test the hours 
of 7 a.m. to 11 p.m. based on the mariners comments and the fact that 
these hours have not been tested previously. Also, records of openings 
provided by the bridge owner regarding previous test periods have been 
incomplete and are therefore inconclusive. Complete records of openings 
during the scheduled test period will be considered by the Coast Guard 
for future rulemaking.
    This temporary final rule extends the operating hours requiring the 
bridge to open on signal from May 27, 1996, to September 30, 1996, from 
7 a.m. to 11 p.m. each day. Additionally, the advance notice 
requirement for openings from 11 p.m. to 7 a.m. is being changed from 
the existing two and five hour advance notice to a four hours advance 
notice from Memorial Day to the end of September. The existing 
requirement to provide two hours notice from 6:45 a.m. to 3:45 p.m. and 
at least five hours notice from 3:45 p.m. to 6:45 a.m. is confusing and 
difficult for mariners to recall while at sea or when they do not have 
access to a copy of the requirements. The Coast Guard will evaluate the 
effect of the four hour advance notice requirement during the 1996 
boating season and may propose a modification of the requirement as a 
result of comments received.

Discussion of Proposed Amendments

    This temporary final rule requires the bridge to open on signal 
from 7 a.m. to 11 p.m. from May 27, 1996, (Memorial Day) through 
September 30, 1996, an additional eight hours a day. In addition, a 
four hour advance notice for openings will be required from 11 p.m. to 
7 a.m. during this same test period.
    At present, mariners are forced either to return early after 
sailing or tie up at locations outside of the bridge (and the inner 
harbor where their moorings are located) if they return after 6 p.m. 
The harbormaster indicated that the increased operating hours would 
provide a safety advantage in the event of an emergency situation. 
Planned and emergency patrols would be able to transit through the 
bridge to the inner harbor on a more frequent basis in the event of a 
vessel in distress or a vessel on fire.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866, and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has not been reviewed by the Office of Management and Budget under that 
order. It is not significant under the regulatory policies and 
procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation, under 
paragraph 10e of the regulatory policies and procedures of DOT, is 
unnecessary.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this action will have a significant 
economic impact on a substantial number of small entities. ``Small 
entities'' include independently owned and operated small businesses 
that are not dominant in their field and that otherwise qualify as 
``small business concerns'' under section 3 of the Small Business Act 
(15 U.S.C. 632). Because of the reasons discussed in the Regulatory 
Evaluation above, the Coast Guard certifies under 5 U.S.C. 605(b) that 
this action, if adopted, will not have a significant economic impact on 
a substantial number of small entities. If, however, you think that 
your business or organization qualifies as a small entity and that this 
rule will have a significant economic impact on your business or 
organization, please submit a comment (see ADDRESSES) explaining why 
you think it qualifies and in what way and to what degree this rule 
will economically affect it.

Collection of Information

    This rule contains no collection of information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this rule in accordance with the 
principles and criteria contained in Executive Order 12612, and it has 
determined that this regulation does not have sufficient federalism 
implications to warrant preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this rule 
and concluded that, under section 2.B.2.e.(32)(e) of Commandant 
Instruction M16475.1B, this proposal is categorically excluded from 
further environmental documentation.

List of Subjects in 33 CFR Part 117

    Bridges.

Temporary Regulations

    For the reasons set out in the preamble, the Coast Guard amends 33 
CFR part 117 as follows:

PART 117--DRAWBRIDGE OPERATION REGULATIONS

    1. The authority citation for part 117 continues to read as 
follows:

    Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 
117.255 also issued under the authority of Pub. L. 102-587, 106 
Stat. 5039.

[[Page 18948]]

    2. Section 117.603 is suspended and a new 117.604 is added to read 
as follows:

Sec. 117.604   Manchester Harbor.

    The Massachusetts Bay Transportation Authority Bridge at mile 1.0, 
in Manchester, shall operate as follows:
    (a) The draw shall open on signal from 7 a.m. to 11 p.m. each day.
    (b) At all other times, at least four hours advance notice for 
openings is required by calling the number posted at the bridge.

    Dated: April 22, 1996.
J.L. Linnon,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 96-10658 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-10657 Clean Air Act Final Full Approval of Operating Permits Program; Knox County Department of Air Pollution Control, Knox County, Tennessee
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18966-18968]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10657]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 70

[TN-KNOX-95-01; FRL-5464-1]

Clean Air Act Final Full Approval of Operating Permits Program; 
Knox County Department of Air Pollution Control, Knox County, Tennessee

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final full approval.

-----------------------------------------------------------------------

SUMMARY: The EPA is promulgating full approval of the title V operating 
permits program submitted by the State of Tennessee on behalf of the 
Department of Air Pollution Control (``Knox County'' or ``the 
County''), located in the geographic area of Knox County. The County's 
program was submitted for the purpose of complying with Federal 
requirements which mandate that states or local authorities develop, 
and submit to EPA, programs for issuing operating permits to all major 
stationary sources, and to certain other sources.

EFFECTIVE DATE: May 30, 1996.

ADDRESSES: Copies of the Knox County submittal and other supporting 
information used in developing the final full approval are available 
for inspection during normal business hours at the following location: 
U.S. Environmental Protection Agency, Region 4, 345 Courtland Street 
NE, Atlanta, Georgia 30365, on the 3rd floor of the Tower Building. 
Interested persons wanting to examine these documents, contained in EPA 
docket number TN-KNOX-95-01, should make an appointment at least 24 
hours before the visiting day.

FOR FURTHER INFORMATION CONTACT: Gracy R. Danois, Title V Program 
Development Team, Air Programs Branch, Air, Pesticides & Toxics 
Management Division, U.S. Environmental Protection Agency, Region 4, 
345 Courtland Street, NE, Atlanta, Georgia 30365, (404) 347-3555, Ext. 
4150.

SUPPLEMENTARY INFORMATION:

I. Background and Purpose

A. Introduction

    Title V of the 1990 Clean Air Act Amendments (sections 501-507 of 
the

[[Page 18967]]

Clean Air Act (``the Act'')), and implementing regulations at 40 Code 
of Federal Regulations (CFR) part 70 require that states or authorized 
local agencies develop and submit operating permits programs to EPA by 
November 15, 1993, and that EPA act to approve or disapprove each 
program within one year after receiving the submittal. EPA's program 
review occurs pursuant to section 502 of the Act and the part 70 
regulations, which together outline criteria for approval or 
disapproval. Where a program substantially, but not fully, meets the 
requirements of part 70, EPA may grant the program interim approval for 
a period of up to two years. If EPA has not fully approved a program by 
November 15, 1995, or by the end of an interim program, it must 
establish and implement a Federal program.
    On November 8, 1995, EPA proposed full approval, or in the 
alternative, interim approval of the operating permits program for Knox 
County. See 60 FR 56281. The November 8, 1995, Federal Register 
document also proposed approval of the County's interim mechanism for 
implementing section 112(g) and for delegation of section 112 standards 
as promulgated. EPA did not receive any comments on the proposal. On 
March 6, 1996, the State of Tennessee submitted on behalf of Knox 
County a package containing revisions to the operating permits program, 
which addressed the deficiencies discussed in the full/interim approval 
document. As required in the November 8, 1995, Federal Register 
document, the County made the following revisions to the Knox County 
Air Pollution Control (K.C.A.P.C.) regulations:
    1. K.C.A.P.C. section 25.70.7.e.2.i.B was amended to include the 
following language: ``Notwithstanding paragraphs e.2.i.A and e.3.i. of 
this section, minor permit modification procedures may be used for 
permit modifications involving the use of economic incentives, 
marketable permits, emissions trading, and other similar approaches, to 
the extent that such minor permit modification procedures are 
explicitly provided for in an applicable implementation plan or in 
applicable requirements promulgated by EPA. The Department may 
establish additional requirements for such permit conditions.''
    2. K.C.A.P.C. section 30.1.D was amended to include the following 
statement: ``These penalties shall be recoverable in a maximum amount 
of $25,000 per day per violation as provided by state law.''
    3. K.C.A.P.C. section 30.1.G was amended to include the following 
language: ``The Director has the authority to restrain or enjoin 
immediately and effectively any person, by order or by suit in court, 
from engaging in any activity in violation of a permit or the Knox 
County Air Pollution Control Regulations that is presenting an imminent 
and substantial endangerment to the public health or welfare, or the 
environment.''
    4. K.C.A.P.C. section 30.1.F was amended to include the following 
statement at the end of the section: ``Such actions may be taken by the 
Director without the necessity of a prior revocation of any permit.''
    These changes and other minor revisions to the County's title V 
program became locally effective on January 10, 1996.
    In this action, EPA is promulgating full approval of the Knox 
County title V operating permits program, and approving the section 
112(g) and section 112(l) mechanisms noted above.

II. Final Action and Implications

A. Title V Operating Permits Program

    The EPA is promulgating full approval of the title V operating 
permits program submitted by the State of Tennessee, on behalf of Knox 
County, on November 12, 1993, and supplemented on August 24, 1994; 
January 6 and 19, 1995; February 6, 1995; May 23, 1995; September 18 
and 25, 1995; and March 6, 1996. The November 8, 1995, Federal Register 
notice established that Knox County would receive full approval of its 
program if the changes to the County's regulations described in the 
previous section were adopted prior to final promulgation. Knox County 
has demonstrated that the program is adequate to meet the minimum 
elements of a state or local operating permits program as specified in 
40 CFR part 70.
    The scope of the County's part 70 program approved in this document 
applies to all part 70 sources (as defined in the approved program) 
within Knox County, except any sources of air pollution over which an 
Indian Tribe has jurisdiction. See, e.g., 59 FR 55813, 55815-18 (Nov. 
9, 1994). The term ``Indian Tribe'' is defined under the Act as ``any 
Indian tribe, band, nation, or other organized group or community, 
including any Alaska Native village, which is Federally recognized as 
eligible for the special programs and services provided by the United 
States to Indians because of their status as Indians.'' See section 
302(r) of the CAA; see also 59 FR 43956, 43962 (Aug. 25, 1994); 58 FR 
54364 (Oct. 21, 1993).

B. Preconstruction Permit Program Implementing Section 112(g)

    EPA is approving the use of Knox County's preconstruction review 
program found in K.C.A.P.C. section 25.1 as a mechanism to implement 
section 112(g) during the transition period between promulgation of 
EPA's section 112(g) rule and the County's adoption of rules 
specifically designed to implement section 112(g). This approval is 
limited to the implementation of the 112(g) rule and is effective only 
during any transition time between the effective date of the 112(g) 
rule and the adoption of specific rules by Knox County to implement 
section 112(g). The duration of this approval is limited to 18 months 
following promulgation by EPA of section 112(g) regulations, to provide 
the County with adequate time to adopt regulations consistent with 
Federal requirements.

C. Program for Delegation of Section 112 Standards as Promulgated

    Requirements for approval, specified in 40 CFR 70.4(b), encompass 
section 112(l)(5) requirements for approval of a program for delegation 
of section 112 standards as promulgated by EPA as they apply to part 70 
sources. Section 112(l)(5) requires that the County's program contain 
adequate authorities, adequate resources for implementation, and an 
expeditious compliance schedule, which are also requirements under part 
70. Therefore, the EPA is also promulgating approval under section 
112(l)(5) and 40 CFR 63.91 of Knox County's program for receiving 
delegation of section 112 standards and programs that are unchanged 
from Federal rules as promulgated. In addition, EPA is approving the 
delegation of all existing standards and programs under 40 CFR parts 61 
and 63. This program for delegation applies to both part 70 sources and 
non-part 70 sources.

III. Administrative Requirements

A. Docket

    Copies of the Knox County submittal and other information relied 
upon for the final full approval are contained in docket number TN-
KNOX-95-01 maintained at the EPA Regional Office. The docket is an 
organized and complete file of all the information submitted to, or 
otherwise considered by, EPA in the development of this final full 
approval. The docket is available for public inspection at the location 
listed under the ADDRESSES section of this document.

[[Page 18968]]

B. Executive Order 12866

    The Office of Management and Budget has exempted this action from 
Executive Order 12866 review.

C. Regulatory Flexibility Act

    The EPA's actions under section 502 of the Act do not create any 
new requirements, but simply address operating permits programs 
submitted to satisfy the requirements of 40 CFR part 70. Because this 
action does not impose any new requirements, it does not have a 
significant impact on a substantial number of small entities.

List of Subjects in 40 CFR Part 70

    Environmental protection, Administrative practice and procedure, 
Air pollution control, Intergovernmental relations, Operating permits, 
Reporting and recordkeeping requirements.

    Dated: April 19, 1996.
A. Stanley Meiburg,
Acting Regional Administrator.

    Part 70, title 40 of the Code of Federal Regulations is amended as 
follows:

PART 70--[AMENDED]

    1. The authority citation for part 70 continues to read as follows:

    Authority: 42 U.S.C. 7401, et seq.

    2. Appendix A to part 70 is amended by adding paragraph (c) to the 
entry for Tennessee to read as follows:

Appendix A to Part 70--Approval Status of State and Local Operating 
Permits Programs

* * * * *
Tennessee
* * * * *
    (c) The Knox County Department of Air Pollution Control; submitted 
on November 12, 1993, and supplemented on August 24, 1994; January 6 
and 19, 1995; February 6, 1995; May 23, 1995; September 18 and 25, 
1995; and March 6, 1996; full approval effective on May 30, 1996, in 
the Federal Register.
* * * * *
[FR Doc. 96-10657 Filed 4-29-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-10600 Office of the Assistant Secretary for Housing-Federal Housing Commissioner; Revision of FHA Multifamily Processing and Fees; Technical Correction
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Page 18944]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10600]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Parts 200, 232, and 241

[Docket No. FR-3349-C-04]
RIN 2502-AF74

Office of the Assistant Secretary for Housing-Federal Housing 
Commissioner; Revision of FHA Multifamily Processing and Fees; 
Technical Correction

AGENCY: Office of the Assistant Secretary for Housing-Federal Housing 
Commissioner, HUD.

ACTION: Final rule; technical correction.

-----------------------------------------------------------------------

SUMMARY: This document contains a correction to the final rule which 
was published on Monday, April 1, 1996, (61 FR 14410). That final rule 
concerned FHA multifamily mortgage insurance.

EFFECTIVE DATE: May 1, 1996.

FOR FURTHER INFORMATION CONTACT: Jane Luton, Director, New Products 
Division, Office of Multifamily Housing Development, Room 6138, 
Department of Housing and Urban Development, 451 Seventh Street, SW, 
Washington, DC 20410-8000, telephone (202) 708-2556. (This is not a 
toll-free telephone number.) Hearing- or speech-impaired may access 
this number via TTY by calling the Federal Information Relay Service at 
1-800-877-8339.

SUPPLEMENTARY INFORMATION:

Background

    The final rule that is the subject of these corrections revised 24 
CFR 200.40 and 200.45 of the FHA multifamily mortgage insurance 
regulations to increase processing/commitment fees and to make certain 
changes in the stages of processing.

Need for Correction

    As published, the preamble to final regulations omitted a word 
which may prove to be misleading.
    Accordingly, FR Doc. 96-7640, a final rule published in the Federal 
Register on April 1, 1996 (61 FR 14410), is corrected as follows:
    On page 14411, in the preamble, in the first column, in the first 
paragraph under the heading ``4. Elimination of Conditional Commitment 
Stage,'' the third line is corrected by adding the word ``except'' 
after the word ``stage''.

    Dated: April 18, 1996.
Stephanie A. Smith,
Acting General Deputy, Assistant Secretary for Housing-Federal Housing 
Commissioner.
[FR Doc. 96-10600 Filed 4-29-96; 8:45 am]
BILLING CODE 4210-27-P

Complete official Federal Register PDF

FR Doc. 96-10568 Approval and Promulgation of Implementation Plans and Delegation of 112(l); State of Iowa
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18958-18959]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10568]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[IA 003-1003; FRL-5455-4]

Approval and Promulgation of Implementation Plans and Delegation 
of 112(l); State of Iowa

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: On August 4, 1995, the EPA published a proposed rulemaking to 
approve Iowa's voluntary operating permit program to serve as an 
alternative for sources otherwise subject to Title V of the Clean Air 
Act (the Act). No adverse comments were received on the proposed 
rulemaking. The EPA is now taking final action to approve this program.

EFFECTIVE DATE: This rule will become effective on May 30, 1996.

ADDRESSES: Copies of the documents relevant to this action are 
available for public inspection during normal business hours at the: 
Environmental Protection Agency, Air Planning and Development Branch, 
726 Minnesota Avenue, Kansas City, Kansas 66101; and EPA Air & 
Radiation Docket and Information Center, 401 M Street, SW., Washington, 
DC 20460.

FOR FURTHER INFORMATION CONTACT: Christopher D. Hess at (913) 551-7213.

SUPPLEMENTARY INFORMATION: At 60 FR 39907, dated August 4, 1995, the 
EPA published a proposed rulemaking to approve Iowa's voluntary 
operating permit program as part of the State Implementation Plan (SIP) 
and pursuant to section 112(l) of the Act. This program serves as an 
alternative for sources which might otherwise be subject to Title V. In 
Section V of the August 4, 1995, Federal Register document proposing 
approval of Iowa's program, the EPA cited four regulatory deficiencies 
for the state to correct in order for EPA to proceed with final 
rulemaking. These four deficiencies concerned the definition of 12-
month rolling period; fugitive emissions; eligibility for a voluntary 
permit; and a requirement that permit limitations, controls, and 
requirements be enforceable as a practical matter. The state adopted 
these changes and submitted them to the EPA under the signature of 
Larry Wilson, Director, Iowa Department of Natural Resources, on 
February 16, 1996. For further information on these items, the reader 
should consult the proposed rulemaking and the technical support 
document.

[[Page 18959]]

    In a subsequent matter not contemplated in the proposed rulemaking, 
the state has made one regulatory change concerning when a source shall 
apply for a voluntary operating permit. In the original rule, the date 
of March 1, 1995, was specified. However, due to the delay in receiving 
approval of the program, the state revised its rule at 22.203(1)a(1) to 
read that applications are due 90 days after approval of the state's 
Title V program (October 1, 1995).
    This change became effective on February 24, 1995, and was 
submitted to the EPA under the Director's signature on February 27, 
1996. This change is approvable by the EPA because it is 
noncontroversial and it precludes sources from the tenuous position of 
applying for a program not yet approved (which the original rule did 
not anticipate).

EPA Action

    The EPA is taking final action to approve revisions submitted on 
December 8, 1994; February 16, 1996; and February 27, 1996, for the 
state of Iowa. This action makes the state's program a federally 
enforceable part of the SIP, and also makes such permits federally 
enforceable for hazardous air pollutants by means of EPA's approval 
under section 112(l).
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any SIP. Each request for revision to the SIP shall be 
considered separately in light of specific technical, economic, and 
environmental factors, and in relation to relevant statutory and 
regulatory requirements.
    SIP approvals under section 110 and subchapter I, Part D of the 
Clean Air Act (CAA) do not create any new requirements, but simply 
approve requirements that the state is already imposing. Therefore, 
because the federal SIP approval does not impose any new requirements, 
the EPA certifies that it does not have a significant impact on any 
small entities affected. Moreover, due to the nature of the federal-
state relationship under the CAA, preparation of a regulatory 
flexibility analysis would constitute federal inquiry into the economic 
reasonableness of state action. The CAA forbids the EPA to base its 
actions concerning SIPs on such grounds (Union Electric Co. v. U.S. 
E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 42 U.S.C. 7410(a)(2)).
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 2214-2225), as revised by a 
July 10, 1995, memorandum from Mary Nichols, Assistant Administrator 
for Air and Radiation. The Office of Management and Budget has exempted 
this regulatory action from E.O. 12866 review.

Unfunded Mandates

    Under sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, the EPA must undertake various actions in association with 
proposed or final rules that include a federal mandate that may result 
in estimated costs of $100 million or more to the private sector, or to 
state, local, or tribal governments in the aggregate.
    Through submission of this SIP, the state has elected to adopt the 
program provided for under section 110 of the CAA. These rules may bind 
state and local governments to perform certain actions and also require 
the private sector to perform certain duties. To the extent that the 
rules being finalized for approval by this action will impose new 
requirements, sources are already subject to these regulations under 
state law. Accordingly, no additional costs to state or local 
governments, or to the private sector, result from this final action. 
The EPA has also determined that this final action does not include a 
mandate that may result in estimated costs of $100 million or more to 
state or local governments in the aggregate or to the private sector. 
The EPA has determined that these rules result in no additional costs 
to tribal government.
    Under section 307(b)(1) of the CAA, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by July 1, 1996. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this rule for the purposes of judicial review, nor does 
it extend the time within which a petition for judicial review may be 
filed, and shall not postpone the effectiveness of such rule or action. 
This action may not be challenged later in proceedings to enforce its 
requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Incorporation by reference, Intergovernmental relations, 
Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and 
recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

    Dated: March 25, 1996.
William Rice,
Acting Regional Administrator.
    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart Q--Iowa

    2. Section 52.820 is amended by adding paragraph (c)(63) to read as 
follows:

Sec. 52.820  Identification of plan.

* * * * *
    (c) * * *
    (63) On December 8, 1994; February 16, 1996; and February 27, 1996, 
the Director of the Iowa Department of Natural Resources submitted 
revisions to the State Implemenation Plan (SIP) to create a voluntary 
operating permit program as an alternative to Title V. These revisions 
strengthen maintenance of established air quality standards.
    (i) Incorporation by reference.
    (A) ``Iowa Administrative Code,'' sections 567-22.200-22.208, 
effective December 14, 1994. These rules create the voluntary operating 
permit program.
    (B) ``Iowa Administrative Code,'' sections 567-22.201(1)``a'' and 
22.206(1)``h'', effective January 11, 1995.
    (C) ``Iowa Administrative Code,'' section 567-22.203(1)``a''(1), 
effective February 24, 1995.
    (D) ``Iowa Administrative Code,'' sections 567-20.2; 22.200; 
22.201(1)``a'' and ``b''; 22.201(2)``a''; and 22.206(2)``c'', effective 
October 18, 1995.
    (ii) Additional material.
    (A) Letter from Allan E. Stokes, Iowa Department of Natural 
Resources, to William A. Spratlin, U.S. EPA, dated February 16, 1995. 
This letter outlines various commitments by the state to meet 
requirements outlined by the EPA.
[FR Doc. 96-10568 Filed 4-29-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-10566 Approval and Promulgation of Implementation Plans; California State Implementation Plan Revision; Ventura County Air Pollution Control District; Sacramento Metropolitan Air Quality Management Division; Placer County Air Pollution Control District
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18959-18962]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10566]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[CA153-2-7274a FRL-5459-3]

Approval and Promulgation of Implementation Plans; California 
State Implementation Plan Revision; Ventura County Air Pollution 
Control District; Sacramento Metropolitan Air Quality Management 
Division; Placer County Air Pollution Control District

AGENCY: Environmental Protection Agency (EPA).

[[Page 18960]]

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is taking direct final action on revisions to the 
California State Implementation Plan. The revisions concern rules from 
the Ventura County Air Pollution Control District (VCAPCD), the 
Sacramento Metropolitan Air Quality Management Division (SMAQMD), and 
the Placer County Air Pollution Control District (PCAPCD). This 
approval action will incorporate three rules into the federally 
approved SIP. The intended effect of approving these rules is to 
regulate emissions of oxides of nitrogen (NOX) in accordance with 
the requirements of the Clean Air Act, as amended in 1990 (CAA or the 
Act). The rules control NOX emissions from natural gas-fired 
central furnaces, stationary internal combustion engines, and biomass 
boilers.

DATES: This action is effective on July 1, 1996, unless adverse or 
critical comments are received by May 30, 1996. If the effective date 
is delayed, a timely notice will be published in the Federal Register.

ADDRESSES: Copies of the rules and EPA's evaluation report for each 
rule are available for public inspection at EPA's Region IX office 
during normal business hours. Copies of the submitted rules are 
available for inspection at the following locations:

Rulemaking Section (A-5-3), Air and Toxics Division, U.S. Environmental 
Protection Agency, Region IX, 75 Hawthorne Street, San Francisco, CA 
94105.
Environmental Protection Agency, Air Docket (6102), 401 ``M'' Street, 
S.W., Washington, D.C. 20460.
California Air Resources Board, Stationary Source Division, Rule 
Evaluation Section, 2020 ``L'' Street, Sacramento, CA 95814.
Ventura County Air Pollution Control District, Rule Development 
Section, 669 County Square Drive, Ventura, CA 93003.
Sacramento Metropolitan Air Quality Management District, Rule 
Development Section, 8411 Jackson Road, Sacramento, CA 95826.
Placer County Air Quality Management District, Rule Development, 11464 
B. Avenue, Auburn, CA 95603.

FOR FURTHER INFORMATION CONTACT: Wendy Colombo, Rulemaking Section (A-
5-3), Air and Toxics Division, U.S. Environmental Protection Agency, 
Region IX, 75 Hawthorne Street, San Francisco, CA 94105, Telephone: 
(415) 744-1202.

Applicability

    This notice addresses EPA's direct final action for the following 
rules:
     VCAPCD, Rule 74.22, Natural Gas-Fired, Central Fan- Type 
Furnaces;
     SMAQMD, Rule 412, Stationary Internal Combustion Engines 
Located at Major Stationary Sources; and
     PCAPCD, Rule 233, Biomass Boilers.
    The rules were adopted by the districts, submitted by the State of 
California, and found complete pursuant to EPA's completeness criteria 
set forth in 40 CFR Part 51 Appendix V \1\ on the following dates:
---------------------------------------------------------------------------

    \1\ EPA adopted the completeness criteria on February 16, 1990 
(55 FR 5830) and, pursuant to section 110(k)(1)(A) of the CAA, 
revised the criteria on August 26, 1991 (56 FR 42216).
---------------------------------------------------------------------------

     Rule 74.22--November 9, 1993; February 11, 1994; April 11, 
1994.
     Rule 412--June 1, 1995; June 23, 1995; June 30, 1995.
     Rule 233--October 6, 1994; October 19, 1994; October 21, 
1995.

Background:

    On November 15, 1990, the Clean Air Act Amendments of 1990 (CAA) 
were enacted. Pub. L. 101-549, 104 Stat. 2399, codified at 42 U.S.C. 
7401-7671q. The air quality planning requirements for the reduction of 
NOX emissions through reasonably available control technology 
(RACT) are set out in section 182(f) of the CAA. On November 25, 1992, 
EPA published a notice of proposed rulemaking entitled ``State 
Implementation Plans; Nitrogen Oxides Supplement to the General 
Preamble; Clean Air Act Amendments of 1990 Implementation of Title I; 
Proposed Rule,'' (the NOX Supplement) which describes the 
requirements of section 182(f). The NOX Supplement should be 
referred to for further information on the NOX requirements and is 
incorporated into this document by reference. Section 182(f) of the 
Clean Air Act requires States to apply the same requirements to major 
stationary sources of NOX (``major'' as defined in section 302 and 
section 182 (c), (d), and (e)) as are applied to major stationary 
sources of volatile organic compounds (VOCs), in moderate or above 
ozone nonattainment areas. The Sacramento Metropolitan Area (including 
part of Placer County) and the Ventura County Area are classified as a 
severe nonattainment areas for ozone.\2\. Both areas are subject to the 
RACT requirements of section 182(b)(2), cited above.
---------------------------------------------------------------------------

    \2\ The Sacramento Metropolitan (including Placer) and Ventura 
areas were designated nonattainment and classified by operation of 
law pursuant to sections 107(d) and 181(a) upon the date of 
enactment of the CAA. See 55 FR 56694 (November 6, 1991). The 
Sacramento Metropolitan Area was reclassified from serious to severe 
on June 1, 1995. See 60 FR 20237 (April 25, 1995).
---------------------------------------------------------------------------

    Section 182(b)(2) requires submittal of RACT rules for major 
stationary sources of VOC emissions (not covered by a pre-enactment 
control technique guidelines (CTG) document or a post-enactment CTG 
document) by November 15, 1992. There were no NOX CTGs issued 
before enactment and EPA has not issued a CTG document for any NOX 
category since enactment of the CAA. The RACT rules covering NOX 
sources and submitted as SIP revisions are expected to require final 
installation of the actual NOX controls by May 31, 1995 for those 
sources where installation by that date is practicable.
    NOX emissions contribute to the production of ground level 
ozone and smog. The three rules control emissions of NOX from 
various industries used in a wide variety of applications. The rules 
were adopted as part of the VCAPCD's, SMAQMD's, and PCAPCD's efforts to 
achieve and maintain the National Ambient Air Quality Standards (NAAQS) 
for ozone. All three rules are required to satisfy the mandates of the 
Clean Air Act requirements, and were submitted pursuant to the CAA 
requirements cited above.

EPA Evaluation and Action

    In determining the approvability of a NOX rule, EPA must 
evaluate the rule for consistency with the requirements of the CAA and 
EPA regulations, as found in section 110 and part D of the CAA and 40 
CFR part 51 (Requirements for Preparation, Adoption and Submittal of 
Implementation Plans). The EPA interpretations of these requirements, 
which form the basis for this action, appear in the NOX Supplement 
and various other EPA policy guidance documents.3 Among these 
provisions is the requirement that a NOX rule must, at a minimum, 
provide for the implementation of RACT for stationary sources of 
NOX emissions.
---------------------------------------------------------------------------

    \3\ Among other things, the pre-amendment guidance consists of 
those portions of the proposed post-1987 ozone and carbon monoxide 
policy that concern RACT, 52 FR 45044 (November 24, 1987); ``Issues 
Relating to VOC Regulation Cutpoints, Deficiencies, and Deviations, 
Clarification to Appendix D of November 24, 1987 Federal Register 
Notice'' (Blue Book) (notice of availability was published in the 
Federal Register on May 25, 1988).
---------------------------------------------------------------------------

    For the purposes of assisting state and local agencies in 
developing NOX RACT rules, EPA prepared the NOX Supplement to 
the General Preamble, cited above (57 FR 55620). In the NOX 
Supplement, EPA provides guidance on how RACT should be determined for 
major stationary sources of NOX emissions. The document sets RACT 
emission levels specifically for electric utility boilers. For all 
other source

[[Page 18961]]

categories, EPA expects States/Districts to establish RACT levels 
comparable to those levels for utility boilers taking into account 
cost, cost-effectiveness, and emission reductions.
    While most of the guidance issued by EPA (previous to the NOX 
Supplement) on what constitutes RACT for stationary sources has been 
directed towards application for VOC sources, much of the guidance is 
also applicable to RACT for stationary sources of NOX (see section 
4.5 of the NOX Supplement). In addition, pursuant to section 
183(c), EPA has issued alternative control techniques documents (ACTs), 
that identify alternative controls for most categories of stationary 
sources of NOX. The ACT documents provide information on control 
technology for stationary sources that emit or have the potential to 
emit 25 tons per year or more of NOX. While providing guidance and 
information for States to use in making RACT determinations, the ACTs 
do not establish a presumptive norm for what is considered RACT for 
stationary sources of NOX. In general, the guidance documents 
cited above, as well as other relevant and applicable guidance 
documents, have been issued by EPA to ensure that submitted NOX 
RACT rules are fully enforceable and strengthen or maintain the SIP.
    Placer Rule 233 sets NOX limits at 115 parts per million (ppm) 
corrected to 12% carbon dioxide (0.2096 pounds per million British 
Thermal Units (lb/MMBTU)). This limit corresponds to 162 ppm corrected 
to 3% oxygen. The district believes this limit meets RACT because it is 
similar to the RACT limits that EPA has set for electric utility 
boilers (0.20-0.50 lb/MMBTU). The district set the limits based on 
current emission limitations at existing facilities in Placer county, 
and is not expecting to achieve any further emissions reductions as a 
result of adopting this rule. Additionally, there will be no additional 
costs incurred by the sources subject to this rule as a result of its 
adoption.
    The California Air Resources Board RACT/BARCT Guidance 4 
document for institutional, commercial, and industrial boilers suggests 
a RACT limit of 70 ppm corrected to 3% O2 for such units fired 
with gaseous fuel and 115-150 ppm for units fired with fuels other than 
gas. EPA established RACT levels for electric utility boilers and 
recommended for other source categories that States/Districts make RACT 
determinations comparable to those EPA established for electric utility 
boilers. This comparability should be based on several factors 
including cost, cost-effectiveness, and emission reductions. Because of 
the variability in application, equipment, and input and output 
characteristics of different NOX source categories, comparability 
cannot easily be done solely by comparing the emissions rates. That is 
why EPA suggests that RACT levels should be made in comparison to the 
limits set for electric utility boilers using the factors cited above.
---------------------------------------------------------------------------

    \4\ Determination of Reasonably Available Control Technology and 
Best Available Retrofit Control Technology for Industrial, 
Institutional, and Commercial Boilers, Steam Generators, and Process 
Heaters (RACT/BARCT guidance for ICI boilers), California Air 
Resources Board, July 18, 1991.
---------------------------------------------------------------------------

    EPA does not necessarily agree that the limits in Rule 233 
represent what would generally be considered RACT for this source 
category, even though the emissions rates are similar to those set for 
utility boilers. However, EPA recognizes that the two sources covered 
by this rule are already applying NOX reduction technology 
according to their permits (district and federal). One source is 
permitted at 54 ppm at 12% CO2 and the other at 115 ppm at 12% 
CO2. Because these sources are currently utilizing NOX 
controls, EPA believes the cost of achieving additional small 
reductions of NOX to meet the general RACT limits would be cost 
prohibitive. In addition, PCAPCD is not claiming any emissions 
reductions in their Federal ozone attainment plan for Rule 233 and has 
submitted the rule for incorporation into the SIP to prevent any 
NOX emissions increases from this source category. Therefore, EPA 
agrees that in this circumstance the limits set in Rule 233 for these 
sources satisfies the RACT requirements of the CAA.
    Ventura Rule 74.22 sets NOX emission levels at 40 nanograms 
per joule of heat output (ng/J). This limit represents a 75% average 
reduction from typical natural-gas fired furnaces and will be achieved 
from new units being purchased and installed. The limit was chosen so 
as not to require homeowners or businesses to modify furnace enclosures 
when replacing existing furnaces in order to keep the costs 
appropriate. The VCAPCD estimates the cost of compliance at 
approximately $2.24 per pound of NOX reduced, and expects the rule 
to achieve reductions of 1.5 tons per day. Final compliance is required 
by May 31, 1994.
    Sacramento Rule 412 sets limits for RACT and BARCT in the rule. The 
RACT levels are set at 50/125/700 ppm for rich burn, lean burn, and 
diesel engines, respectively. The BARCT limits are set at 25/65/80 ppm 
for rich, lean, and diesel engines, respectively. The rule is 
structured to allow exemptions from compliance with the emissions 
limits for some units which operate at annual levels that the control 
of which would not be cost-effective. The rule is expected to achieve 
reductions of 2.2 tons per year. RACT is required to be implemented by 
July 1, 1995.
    EPA is incorporating these rules into the SIP because they 
strengthen the SIP through the addition of enforceable measures such as 
NOX emission limits, recordkeeping, test methods, definitions, and 
compliance tests. EPA believes all three rules for these source 
categories in each district satisfy the RACT requirements of the CAA. A 
more detailed discussion of the sources controlled, the controls 
required, and the analysis of how these controls meet RACT can be found 
in the Technical Support Document (TSD) and its attachments, dated 
November 1995.
    EPA has evaluated the submitted rules and has determined that they 
are consistent with the CAA, EPA regulations and EPA policy. All three 
rules are new rules establishing RACT for their particular category, 
and contain implementation dates consistent with the CAA and EPA's 
policy. Therefore, all three are being approved under section 110(k)(3) 
of the CAA as meeting the requirements of section 110(a) and Part D.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future implementation 
plan. Each request for revision to the state implementation plan shall 
be considered separately in light of specific technical, economic, and 
environmental factors and in relation to relevant statutory and 
regulatory requirements.
    EPA is publishing this document without prior proposal because the 
Agency views this as a noncontroversial amendment and anticipates no 
adverse comments. However, in a separate document in this Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed. This action will be 
effective July 1, 1996, unless, by May 30, 1996, adverse or critical 
comments are received.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent document that will 
withdraw the final action. All public comments received will then be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time. If no such comments are

[[Page 18962]]

received, the public is advised that this action will be effective July 
1, 1996.

Regulatory Process

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et. seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises and 
government entities with jurisdiction over population of less than 
50,000.
    SIP approvals under sections 110 and 301(a) and subchapter I, Part 
D of the CAA do not create any new requirements, but simply approve 
requirements that the State is already imposing. Therefore, because the 
Federal SIP-approval does not impose any new requirements, I certify 
that it does not have a significant impact on any small entities 
affected. Moreover, due to the nature of the Federal-state relationship 
under the CAA, preparation of a regulatory flexibility analysis would 
constitute Federal inquiry into the economic reasonableness of state 
action. The CAA forbids EPA to base its actions concerning SIPs on such 
grounds. Union Electric Co. v. U.S. E.P.A., 427 U.S. 246, 256-66 (S. 
Ct. 1976); 42 U.S.C. 7410(a)(2).

Unfunded Mandates

    Under Sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector or to 
State, local, or tribal governments in the aggregate.
    Through submission of this state implementation plan or plan 
revision, the State and any affected local or tribal governments have 
elected to adopt the program provided for under Part D of the Clean Air 
Act. These rules may bind State, local, and tribal governments to 
perform certain actions and also require the private sector to perform 
certain duties. The rules being approved by this action will impose no 
new requirements because affected sources are already subject to these 
regulations under State law. Therefore, no additional costs to State, 
local, or tribal governments or to the private sector result from this 
action. EPA has also determined that this final action does not include 
a mandate that may result in estimated costs of $100 million or more to 
State, local, or tribal governments in the aggregate or to the private 
sector.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from Executive Order 12866 review.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Hydrocarbons, 
Incorporation by reference, Intergovernmental relations, Oxides of 
nitrogen, Ozone, Reporting and recordkeeping requirements, Volatile 
organic compounds.
    Note: Incorporation by reference of the State Implementation 
Plan for the State of California was approved by the Director of the 
Federal Register on July 1, 1982.

    Dated: April 1, 1996.
Felicia Marcus,
Regional Administrator.

    Subpart F of Part 52, Chapter I, Title 40 of the Code of Federal 
Regulations is amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart F--California

    2. Section 52.220 is amended by adding paragraphs (c)(195)(i)(B), 
(202)(E)(i)(2), and (222)(i)(C)(3) to read as follows:

Sec. 52.220  Identification of plan.

* * * * *
    (c) * * *
    (195) * * *
    (i) * * *
    (B) Ventura County Air Pollution Control District.
    (1) Rule 74.22, adopted on November 9, 1993.
* * * * *
    (202) * * *
    (i) * * *
    (E) * * *
    (2) Rule 233, adopted on October 6, 1994.
* * * * *
    (222) * * *
    (i) * * *
    (C) * * *
    (3) Rule 412, adopted on June 1, 1995.
* * * * *
[FR Doc. 96-10566 Filed 4-29-96; 8:45 am]
BILLING CODE 6560-50-W

Complete official Federal Register PDF

FR Doc. 96-10563 Approval and Promulgation of Implementation Plans; California State Implementation Plan Revision, Placer County Air Pollution Control District, El Dorado County Air Pollution Control District, Ventura County Air Pollution Control District, Yolo-Solano Air Quality Management District, and Mojave Desert Air Quality Management District
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18962-18966]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10563]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[CA 095-0006a; FRL-5454-9]

Approval and Promulgation of Implementation Plans; California 
State Implementation Plan Revision, Placer County Air Pollution Control 
District, El Dorado County Air Pollution Control District, Ventura 
County Air Pollution Control District, Yolo-Solano Air Quality 
Management District, and Mojave Desert Air Quality Management District

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is taking direct final action on revisions to the 
California State Implementation Plan (SIP). The revisions concern rules 
from the following districts: Placer County Air Pollution Control 
District (PLCAPCD), El Dorado County Air Pollution Control District 
(EDCAPCD), Ventura County Air Pollution Control District (VTCAPCD), 
Yolo-Solano Air Quality Management District (YSAQMD), and Mojave Desert 
Air Quality Management District (MDAQMD). This approval action will 
incorporate these rules into the federally approved SIP. The intended 
effect of approving these rules is to regulate emissions of volatile 
organic compounds (VOCs) in accordance with the requirements of the 
Clean Air Act, as amended in 1990 (CAA or the Act). The revised rules 
control VOC emissions from automotive refinishing, solvent cleaning and 
degreasing, wood coating and graphic arts operations. Thus, EPA is 
finalizing the approval of these revisions into the California SIP 
under provisions of the CAA regarding EPA action on SIP submittal, SIPs 
for national primary and secondary ambient air quality standards and 
plan requirements for nonattainment areas.

DATES: This action is effective on July 1, 1996, unless adverse or 
critical comments are received by May 30, 1996. If the effective date 
is delayed, a timely notice will be published in the Federal Register.

ADDRESSES: Copies of the rule revisions and EPA's evaluation report for 
each rule are available for public inspection at EPA's Region IX office 
during normal business hours. Copies of the submitted

[[Page 18963]]

rule revisions are available for inspection at the following locations:

Rulemaking Section (A-5-3), Air and Toxics Division, U.S. 
Environmental Protection Agency, Region IX, 75 Hawthorne Street, San 
Francisco, CA 94105
Environmental Protection Agency, Air Docket (6102), 401 ``M'' 
Street, S.W., Washington, D.C. 20460
California Air Resources Board, Stationary Source Division, Rule 
Evaluation Section, 2020 ``L'' Street, Sacramento, CA 95812-2815
Placer County Air Pollution Control District, 11464 B Avenue, 
Auburn, CA 95603
El Dorado County Air Pollution Control District, 2850 Fairlane 
Court, Placerville, CA 95667
Ventura County Air Pollution Control District, 669 County Square 
Drive, Ventura, CA 93003
Yolo Solano Air Quality Management District, 1947 Galileo Court, 
Suite 103, Davis, CA 95616
Mojave Desert Air Quality Management District, 15428 Civic Drive, 
Suite 200, Victorville, CA 92392-2383

FOR FURTHER INFORMATION CONTACT: Daniel A. Meer, Chief Rulemaking 
Section (A-5-3), Air and Toxics Division, U.S. Environmental Protection 
Agency, Region 9, 75 Hawthorne Street, San Francisco, CA 94105-3901, 
Telephone: (415) 744-1185

SUPPLEMENTARY INFORMATION:

Applicability

    The rules being approved into the California SIP include: PLCAPCD's 
Rule 216, Organic Solvent Cleaning and Degreasing Operations, and Rule 
236, Wood Products Coating Operations; EDCAPCD's Rule 225, Organic 
Solvent Cleaning and Degreasing Operations, Rule 230, Motor Vehicle and 
Mobile Equipment Coating Operations and Rule 235, Surface Preparation 
and Cleanup; VTCAPCD's Rule 74.18 Motor Vehicle and Mobile Equipment 
Coating Operations and Rule 74.30, Wood Products Coatings; YSAQMD's 
Rule 2.13, Organic Solvents and Rule 2.26, Motor Vehicle and Mobile 
Equipment Coating Operations; MDAQMD's Rule 1104, Organic Solvent 
Degreasing Operations, Rule 1114, Wood Products Coating Operations and 
Rule 1117, Graphic Arts. These rules were submitted by the California 
Air Resources Board (CARB) to EPA on July 13, 1994 (Rules 74.30 and 
1117), November 30, 1994 (Rules 225, 230, 1104, and 2.13), February 24, 
1995 (Rule 74.18 and 2.26), March 31, 1995 (Rule 1114), May 24, 1995 
(Rule 236) and October 13, 1995 (Rules 216 and 235).

Background

    On March 3, 1978, EPA promulgated a list of ozone nonattainment 
areas under the provisions of the Clean Air Act, as amended in 1977 
(1977 Act or pre-amended Act), that included Ventura County, part of 
the Southeast Desert Air Basin, and the Sacramento Metro area, which 
includes portions of Placer, Yolo, and El Dorado County. See 43 FR 
8964, 40 CFR 81.305. On May 26, 1988, EPA notified the Governor of 
California, pursuant to section 110(a)(2)(H) of the 1977 Act, that the 
PLCAPCD, EDCAPCD, VTCAPCD, YSAQMD and the MDAQMD portions of the 
California SIP were inadequate to attain and maintain the ozone 
standard and requested that deficiencies in the existing SIP be 
corrected (EPA's SIP-Call). On November 15, 1990, the Clean Air Act 
Amendments of 1990 were enacted. Public Law 101-549, 104 Stat. 2399, 
codified at 42 U.S.C. 7401-7671q. In amended section 182 of the CAA, 
Congress statutorily adopted the requirements that nonattainment areas 
both fix their deficient reasonably available control technology (RACT) 
rules for ozone and submit RACT rules for other stationary sources of 
VOCs (the RACT fix-up and catch-up requirements). Congress established 
a deadline of May 15, 1991 for States to submit corrections to 
deficient rules and a deadline of November 15, 1992 for States to 
submit rules for other VOC source categories.
    Section 182 applies to areas designated as nonattainment prior to 
enactment of the amendments and classified as marginal or above as of 
the date of enactment. It requires such areas to adopt and correct RACT 
rules pursuant to pre-amended section 172 (b) as interpreted in pre-
amendment guidance.1 EPA's SIP-Call used that guidance to indicate 
the necessary corrections for specific nonattainment areas. Ventura 
County, a portion of the Southeast Desert Air Basin, the Sacramento 
Metro area, which includes portions of Placer, Yolo and El Dorado 
County are classified as severe;2 therefore, these areas were 
subject to the RACT fix-up and catch-up requirements and the deadlines 
cited above.3
---------------------------------------------------------------------------

    \1\ Among other things, the pre-amendment guidance consists of 
those portions of the proposed post-1987 ozone and carbon monoxide 
policy that concern RACT, 52 FR 45044 (November 24, 1987); ``Issues 
Relating to VOC Regulation Cutpoints, Deficiencies, and Deviations, 
Clarification to Appendix D of November 24, 1987 Federal Register 
Notice'' (Blue Book) (notice of availability was published in the 
Federal Register on May 25, 1988); and the existing control 
technique guidelines (CTGs).
    \2\ Ventura County and a portion of the Southeast Desert Air 
Basin retained their designation of nonattainment and were 
classified by operation of law pursuant to sections 107(d) and 
181(a) upon the date of enactment of the CAA. See 55 FR 56694 
(November 6, 1991). The Sacramento Metro Area was reclassified from 
serious to severe on June 1, 1995. See 60 FR 20237 (April 25, 1995)
    \3\ California did not make the required SIP submittal for 
Mojave Desert AQMD's Rule 1104, Graphic Arts, by November 15, 1992. 
On January 15, 1993, the EPA made a finding of failure to make a 
submittal pursuant to section 179(a)(1), which started an 18 month 
sanction clock. The rule being acted on in this direct final rule 
was submitted in response to the EPA finding of failure to submit.
---------------------------------------------------------------------------

    The State of California submitted many revised RACT rules for 
incorporation into its SIP on July 13, 1994, November 30, 1994, 
February 24, 1995, March 31, 1995, May 24, 1995, and October 13, 1995, 
including the rules being acted on in this document. This document 
addresses EPA's direct-final action for PLCAPCD's Rule 216, Organic 
Solvent Cleaning and Degreasing Operations, and 236, Wood Products 
Coating Operations; EDCAPCD's Rules 225, Organic Solvent Cleaning and 
Degreasing Operations, 230, Motor Vehicle and Mobile Equipment Coating 
Operations, and 235, Surface Preparation and Cleanup; VTCAPCD's Rules 
74.18 Motor Vehicle and Mobile Equipment Coating Operations, and 74.30, 
Wood Products Coatings; YSAQMD's Rules 2.13, Organic Solvents, and 
2.26, Motor Vehicle and Mobile Equipment Coating Operations; MDAQMD's 
Rules 1104, Organic Solvent Degreasing Operations, 1114, Wood Products 
Coating Operations and 1117, Graphic Arts. These submitted rules were 
found to be complete on July 22, 1994 (1117), September 12, 1994 
(74.30), January 3, 1995 (1104), January 30, 1995 (2.13, 225, and 230), 
March 10, 1995 (74.18, 2.26,), May 2, 1995 (1114), July 24, 1995 (236), 
and November 28, 1995 (216, 235) pursuant to EPA's completeness 
criteria that are set forth in 40 CFR part 51 Appendix V 4 and are 
being finalized for approval into the SIP.
---------------------------------------------------------------------------

    \4\ EPA adopted the completeness criteria on February 16, 1990 
(55 FR 5830) and, pursuant to section 110(k)(1)(A) of the CAA, 
revised the criteria on August 26, 1991 (56 FR 42216).
---------------------------------------------------------------------------

    VTCAPCD's Rule 74.18, EDCAPCD's Rule 230, and YSAQMD's Rule 2.26 
control emissions of VOCs from refinishing of motor vehicles and mobile 
equipment, YSAQMD's Rule 2.13 controls emissions of VOCs from the usage 
of organic solvents, EDCAPCD's Rule 235 controls emissions of VOCs from 
surface preparation and cleanup using organic solvents, EDAPCD's Rule 
225, PLCAPCD's Rule 216 and MDAQMD's Rule 1104 control emissions of 
VOCs from organic solvent degreasing operations, PLCAPCD's Rule 236, 
MDAQMD's Rule 1114 and VTCAPCD's Rule 74.30 control emissions of VOCs 
from coating of wood products and MDAQMD's Rule 1117

[[Page 18964]]

controls emissions of VOCs from graphic arts operations. VOCs 
contribute to the production of ground level ozone and smog. These 
rules were originally adopted by the respective districts as part of 
their effort to achieve the National Ambient Air Quality Standard 
(NAAQS) for ozone and in response to EPA's SIP-Call and the section 
182(a)(2)(A) CAA requirement. The following is EPA's evaluation and 
final action for these rules.

EPA Evaluation and Action

    In determining the approvability of a VOC rule, EPA must evaluate 
the rule for consistency with the requirements of the CAA and EPA 
regulations, as found in section 110 and part D of the CAA and 40 CFR 
part 51 (Requirements for Preparation, Adoption, and Submittal of 
Implementation Plans). The EPA interpretation of these requirements, 
which forms the basis for today's action, appears in the various EPA 
policy guidance documents listed in footnote 1. Among those provisions 
is the requirement that a VOC rule must, at a minimum, provide for the 
implementation of RACT for stationary sources of VOC emissions. This 
requirement was carried forth from the pre-amended Act.
    For the purpose of assisting state and local agencies in developing 
RACT rules, EPA prepared a series of Control Technique Guideline (CTG) 
documents. The CTGs are based on the underlying requirements of the Act 
and specify the presumptive norms for what is RACT for specific source 
categories. Under the CAA, Congress ratified EPA's use of these 
documents, as well as other Agency policy, for requiring States to 
``fix-up'' their RACT rules. See section 182(a)(2)(A). The CTG 
applicable to EDCAPCD's Rule 225, PLCAPCD's Rule 216 and MDAQMD's Rule 
1104 is entitled, Control of Volatile Organic Emissions From Solvent 
Metal Cleaning. EPA-450/2-77-022, U.S. Environmental Protection Agency, 
Office of Air Quality Planning and Standards, November 1977, and the 
CTG applicable to MDAQMD's Rule 1117 is entitled, Control of Volatile 
Organic Emissions from Stationary Sources--Volume VIII: Graphic Arts--
Rotogravure and Flexography, U.S. Environmental Protection Agency, 
Office of Air Quality And Standards, December 1978, EPA-450/2-78-033. 
MDAQMD's Rule 1114 and VTCAPCD's Rule 74.30 limit emissions from a 
source category for which EPA has published a draft CTG entitled, 
Control Techniques Guideline Document; Wood Furniture Finishing and 
Cleaning Operation, see 60 FR 46595, September 7, 1995, which was used 
as guidance in the evaluation. VTCAPCD's Rule 74.18, EDCAPCD's Rules 
230 and 235, and YSAQMD's Rule 2.26, and 2.13 are applicable to source 
categories for which EPA has not published a CTG. Accordingly, these 
rules were evaluated against the interpretation of EPA policy found in 
the Blue Book, referred to in Footnote 1 and against other EPA policy 
including the EPA Region 9/CARB document entitled: Guidance Document 
for correcting VOC rule deficiencies, (April 1991). In general, these 
guidance documents have been set forth to ensure that VOC rules are 
fully enforceable and strengthen or maintain the SIP.
    PLCAPCD's submitted Rule 216, Organic Solvent Cleaning and 
Degreasing Operations, includes the following significant changes from 
the current SIP:
     Updated format of rule to be consistent with other 
district rules, and to enhance clarity,
     Expanded section 200, to include definitions of exempt 
compounds, VOCs, leaks, wipe cleaning, stationary source and lip 
exhaust,
     Regrouped requirements and standards to enhance clarity 
and enforceability of the rule,
     Revised section 500, to cite test methods that have been 
approved by the EPA.
    PLCAPCD's submitted Rule 236, Wood Products Coating Operations, is 
a new rule containing the following significant provisions:
     Limits VOC emissions from coating and surface preparation 
of wood products including furniture, cabinets and custom replica 
furniture, but exempts application of coatings to wooden musical 
instruments, and exempts facilities using less than 20 gallons of 
coatings per year,
     The rule applies only to facilities located in the 
Sacramento Valley Air Basin portion of Placer County.
    EDCAPCD'S submitted Rule 225, Organic Solvent Cleaning and 
Degreasing Operations, includes the following significant changes from 
the current SIP:
     Corrected the deficiencies noted in EPA's SIP call of 
September 7, 1988 (53 FR 34500)
     Incorporates the provisions of the RACT/BARCT 
determination developed by the California Air Resources Board (CARB).
    EDCAPCD's submitted Rule 230, Automotive Refinishing Operations, is 
a new rule containing the following significant provisions:
     Limits the VOC contents of numerous coatings and solvents 
utilized in the automotive refinishing industry,
     Implements the provisions of RACT/BARCT developed by the 
California Air Resources Board,
     Requires the use of high efficiency transfer equipment for 
the application of all coatings, such as High Volume Low Pressure 
(HVLP), electrostatic or other coating application methods having a 
transfer efficiency of 65% or greater,
     Requires add-on abatement equipment when non-compliant 
coatings are being used,
     Specifies testmethods for analysis of samples, 
determination of emissions, transfer efficiency, capture efficiency, 
metallic particle content in metallic coatings and acid concentration 
in pretreatment wash primer,
     Defines recordkeeping requirements.
    EDCAPCD's submitted Rule 235, Surface Preparation and Cleanup is a 
new rule containing the following significant provisions:
     Limits the emissions of VOCs from solvent cleaning 
operations in production, repair, maintenance or servicing of parts, 
products, tools, machinery, equipment, or general work areas,
     Exempts facilities using less than 10 gallons of solvents 
in any one calendar year, provided that the daily use does not exceed 
one liter,
     Defines cleaning devices and methods to be used when 
performing solvent cleaning,
     Defines recordkeeping requirements and test methods.
    VTCAPCD's Rule 74.18, Motor Vehicles and Mobile Equipment Coatings 
Operations, includes the following significant changes from the current 
SIP:
     Sets the standard for pretreatment wash primer at 780 
grams of VOC per liter, and limits the use of this coating to 10% of 
all undercoats used, averaged over one month,
     Deletes the category of precoat,
     Changes the implementation date of the primer sealer VOC 
standard to January 1, 1997,
     Changes the implementation date of the multistage topcoat 
VOC limit to January 1, 1996,
     Limits the use of specialty coatings to no more than 5% of 
total coating usage.
    VTCAPCD's Rule 74.30, Wood Products Coatings, is a new rule 
containing the following significant provisions:
     Limits the VOC content of coatings applied to wood 
products,
     Establishes two categories of wood coating operations: new 
wood products and refinishing wood products,

[[Page 18965]]

     Allows add-on control equipment as an alternative to using 
low VOC coatings,
     Requires operators of wood coating facilities to use 
coating application methods yielding at least 65% transfer efficiency,
     Defines the test methods to be used and specifies 
recordkeeping provisions.
    YSAQMD's Rule 2.13, Organic Solvents, includes the following 
changes from the current SIP:
     Reformatting of the entire rule,
     Added section 101, Purpose
     Added section 102, Applicability
     Deleted the sections concerning asphalt paving and graphic 
arts. These sources are now covered in Rule 2.28 and 2.29 respectively,
     Added section 502, test methods.
    YSAQMD's Rule 2.26, Motor Vehicle and Mobile Equipment Coating 
Operations, is a new rule containing the following significant 
provisions:
     Limits the VOC content of coatings applied to group I and 
group II vehicles,
     Specifies the application method to be used to achieve a 
transfer efficiency of 65% or greater,
     Limits the VOC contents of surface preparation and clean-
up solvents,
     Limits use of specialty coatings to no more than 5% of all 
coatings applied, on a monthly basis,
     Limits use of precoat to no more than 25%, by volume, of 
the amount of primer surfacer used,
     Includes a prohibition of specification and sale clause,
     Defines test methods to be used and specifies records to 
be kept.
    MDAQMD's Rule 1104, Organic Solvent Degreasing Operations, is a new 
rule containing the following significant provisions:
     Limits emissions of VOCs from wipe cleaning and degreasing 
operations using organic solvents,
     Applies to any facility engaged in wipe cleaning, cold 
solvent cleaning (degreasing) operations for metal/non metal parts/
products or electronic circuit boards, which utilize organic solvents,
     Defines equipment requirements for remote reservoir 
cleaners, cold solvent degreasers, conveyorized cold solvent 
degreasers, batch loaded vapor degreasers, and conveyorized vapor 
degreasers,
     Defines operating requirements for all degreasers in 
general, and batch loaded, conveyorized degreasers, and remote 
reservoir degreasers specifically,
     Provides recordkeeping requirements and specifies test 
methods.
    MDAQMD's Rule 1114, Wood Products Coating Operations, is a new rule 
containing the following significant provisions:
     Limits emissions of VOCs from the coating operations of 
wood products,
     Provides limits of VOC content for topcoats, fillers 
stains, inks, mold-seal, multi-colored and pigmented coatings, sealers, 
strippers and adhesives.
     Defines application methods to be used when applying 
coatings to achieve a transfer efficiency of 65% or more,
     Defines the VOC limits of clean-up and equipment cleaning 
solvents,
     Allows the use of add-on control devices to comply with 
the rule,
     Exempts facilities using less than one gallon of coating 
material in any one day, or have maximum actual emissions of 3 lbs of 
VOCs per day and not more than 200 lbs of VOCs per calendar year,
     Specifies test methods to be used and records to be kept.
    MDAQMD's Rule 1117, Graphic Arts, is a new rule containing the 
following significant provisions:
     Applies to rotogravure and flexographic printing sources, 
but exempts facilities that emit less than 2500 pounds of VOC per 
month,
     Requires sources to maintain daily records of coatings, 
inks, and adhesives used by the facility. If an emission control system 
is used, the facility must continuously monitor its operating 
parameters,
     Limits VOC content of inks, coatings, and adhesives to 300 
grams per liter of coating as applied,
     Defines capture and control efficiency requirements of 75% 
by weight for publication rotogravure, of 65% by weight for packaging 
rotogravure, and of 60% by weight for flexographic printing,
     Defines test methods to be used and records to be kept.
    EPA has evaluated the submitted rules and has determined that they 
are consistent with the CAA, EPA regulations, and EPA policy. 
Therefore, PLCAPCD's Rules 216, Organic Solvent Cleaning and Degreasing 
Operations, and 236, Wood Products Coating Operations, EDCAPCD's Rules 
225, Organic Solvent Cleaning and Degreasing Operations, 230, Motor 
Vehicle and Mobile Equipment Coating Operations, and 235, Surface 
Preparation and Cleanup, VTCAPCD's Rules 74.18, Motor Vehicle and 
Mobile Equipment Coating Operations, and 74.30, Wood Products Coating, 
YSAQMD's Rules 2.13, Organic Solvents, and 2.26, Motor Vehicles and 
Mobile Equipment Coating Operations, and MDAQMD's Rules 1104, Organic 
Solvent Degreasing Operations, 1114, Wood Products Coating, and 1114, 
Graphic Arts, are being approved under section 110(k)(3) of the CAA as 
meeting the requirements of section 110(a) and part D.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future implementation 
plan. Each request for revision to the state implementation plan shall 
be considered separately in light of specific technical, economic, and 
environmental factors and in relation to relevant statutory and 
regulatory requirements.
    EPA is publishing this document without prior proposal because the 
Agency views this as a noncontroversial amendment and anticipates no 
adverse comments. However, in a separate document in this Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed. This action will be 
effective July 1, 1996, unless, by May 30, 1996, adverse or critical 
comments are received.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent document that will 
withdraw the final action. All public comments received will then be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time. If no such comments are received, the public is 
advised that this action will be effective July 1, 1996.

Regulatory Process

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises and 
government entities with jurisdiction over population of less than 
50,000.
    SIP approvals under sections 110 and 301(a) and subchapter I, Part 
D of the CAA do not create any new requirements, but simply approve 
requirements that the State is already imposing. Therefore, because the 
Federal SIP-approval does not impose any new requirements, I certify 
that it does not have a significant impact on any small entities 
affected. Moreover, due to the nature of the Federal-state relationship 
under the CAA, preparation of a regulatory flexibility analysis would

[[Page 18966]]

constitute Federal inquiry into the economic reasonableness of state 
action. The CAA forbids EPA to base its actions concerning SIPs on such 
grounds. Union Electric Co. v. U.S. E.P.A., 427 U.S. 246, 256-66 (S. 
Ct. 1976); 42 U.S.C. 7410 (a)(2).

Unfunded Mandates

    Under Sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector or to 
State, local, or tribal governments in the aggregate.
    Through submission of this state implementation plan or plan 
revision, the State and any affected local or tribal governments have 
elected to adopt the program provided for under Part D of the Clean Air 
Act. These rules may bind State, local, and tribal governments to 
perform certain actions and also require the private sector to perform 
certain duties. The rules being [proposed for approval/approved] by 
this action will impose no new requirements because affected sources 
are already subject to these regulations under State law. Therefore, no 
additional costs to State, local, or tribal governments or to the 
private sector result from this action. EPA has also determined that 
this [proposed or final] action does not include a mandate that may 
result in estimated costs of $100 million or more to State, local, or 
tribal governments in the aggregate or to the private sector.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from Executive Order 12866 review.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Hydrocarbons, 
Incorporation by reference, Intergovernmental relations, Ozone, 
Reporting and recordkeeping requirements, Volatile organic compounds.
    Note: Incorporation by reference of the State Implementation 
Plan for the State of California was approved by the Director of the 
Federal Register on July 1, 1982.

    Dated: March 26, 1996.
Felicia Marcus,
Regional Administrator.
    Subpart F of part 52, chapter I, title 40 of the Code of Federal 
Regulations is amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart F--California

    2. Section 52.220 is amended by adding paragraphs (c)(198)(i)(E)(2) 
and (i)(J)(2), (207)(i)(B)(4), (i)(C)(4) and (i)(D)(2),(215)(i)(B)(3) 
and (i)(D)(1), (216)(i)(A)(4), (220)(i)(B)(2) and (225)(i)(B)(5) and 
(i)(C)(2) to read as follows:

Sec. 52.220  Identification of plan.

* * * * *
    (c) * * *
    (198) * * *
    (i) * * *
    (E) * * *
    (2) Rule 1117 adopted June 22, 1994.
* * * * *
    (J) * * *
    (2) Rule 74.30 adopted May 17, 1994.
* * * * *
    (207) * * *
    (i) * * *
    (B) * * *
    (4) Rules 225 and 230 adopted September 27, 1994.
    (C) * * *
    (4) Rule 2.13 adopted May 25, 1994.
    (D) * * *
    (2) Rule 1104 adopted September 28, 1994.
* * * * *
    (215) * * *
    (i) * * *
    (B) * * *
    (3) Rule 74.18 adopted December 13, 1994.
* * * * *
    (D) * * *
    (1) Rule 2.26 adopted November 9, 1994.
* * * * *
    (216) * * *
    (i) * * *
    (A) * * *
    (4) Rule 1114 adopted February 22, 1995.
* * * * *
    (220) * * *
    (i) * * *
    (B) * * *
    (2) Rule 236 adopted on February 9, 1995.
* * * * *
    (225) * * *
    (i) * * *
    (B) * * *
    (5) Rule 216 adopted on June 8, 1995.
    (C) * * *
    (2) Rule 235 adopted on June 27, 1995.
* * * * *
[FR Doc. 96-10563 Filed 4-29-96; 8:45 am]
BILLING CODE 6560-50-W

Complete official Federal Register PDF

FR Doc. 96-10559 Safety Zone Regulations; Fort Vancouver Fourth of July Fireworks Display, Columbia River, Vancouver, WA
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18948-18949]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10559]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 165

[CGD13-95-055]
RIN 2115-AA97

Safety Zone Regulations; Fort Vancouver Fourth of July Fireworks 
Display, Columbia River, Vancouver, WA

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is adopting permanent safety zone regulations 
for the annual Fort Vancouver Fourth of July Fireworks Display in 
Vancouver, Washington. This event is held each year on the Fourth of 
July on the waters of the Columbia River. In the past, the Coast Guard 
has established a temporary safety zone each year to protect the safety 
of life on the navigable waters during this event. However, because the 
event occurs annually, the Coast Guard is adopting a permanent 
description of the event and permanent regulations to better inform the 
boating public.

EFFECTIVE DATE: This rule is effective on May 30, 1996.

ADDRESSES: Unless otherwise indicated, the documents referred to in 
this preamble are available for inspection or copying in the St. Helens 
Building, Waterways Management Section at the U.S. Coast Guard Group 
Portland, 6767 N. Basin Ave., Portland, OR 97217-3992. Normal office 
hours are between 7 a.m. and 4 p.m., Monday through Friday, except 
Federal holidays.

FOR FURTHER INFORMATION CONTACT:
Lieutenant (Junior Grade) C. A. Roskam, c/o Commander, U.S. Coast Guard 
Group Portland, 6767 N. Basin Ave., Portland, OR 97217-3992. 
(Telephone: (503) 240-9327).

SUPPLEMENTARY INFORMATION:

Regulatory History

    On February 9, 1996 the Coast Guard published a notice of proposed 
rulemaking entitled Safety Zone Regulations; Fort Vancouver Fourth of 
July Fireworks Display, Columbia River, Vancouver, WA, in the Federal 
Register (61 FR 4945). The Coast Guard received no letters commenting 
on the proposal. No public hearing was requested, and none was held. No 
changes were made to the regulation, and it is being adopted as 
initially proposed.

Background and Purpose

    The Coast Guard is adopting permanent safety zone regulations for 
the annual Fort Vancouver Fourth of July Fireworks Display in 
Vancouver, Washington. This event is held on the waters of Columbia 
River each year on July fourth from 10 p.m. to 10:30 p.m. (PDT). In the 
past, the Coast Guard has established a temporary safety zone each year 
to protect the safety of life on the navigable waters during the event. 
However, because the event occurs annually, the Coast Guard is adopting 
a permanent description of the event and permanent regulations in the 
Code of Federal Regulations (CFR) to better inform the boating public. 
The Coast Guard, through this action, intends to promote the safety of 
spectators and participants in this event. The Fort Vancouver Fourth of 
July Fireworks Display is being held as part of the celebration for the 
Fourth of July Independence Day in Vancouver, Washington. This event is 
sponsored by the Fort Vancouver Fourth of July Committee. The fireworks 
display is conducted from a barge located just offshore on the Columbia 
River.
    This one day event attracts a large number of spectators gathered 
on the waters near the fireworks display. Spectators who approach the 
fireworks barge at close range during the event may be struck by 
falling debris from the overhead fireworks display.

Discussion of Proposed Regulation

    To promote the safety of both the spectators and the participants 
of this event, this regulation establishes a permanent safety zone 
which would become effective each year during the event. Entry into 
this safety zone and the area surrounding the event will be prohibited. 
This safety zone will be enforced by representatives of the Captain of 
the Port, Portland, Oregon. The Captain of the Port may be assisted by 
other federal agencies.

Regulatory Evaluation

    This regulation is not a significant action under section 3(f) of 
Executive Order 12866 and does not require an assessment of potential 
costs and benefits under section 6(a)(3) of that order. It has been 
exempted from review by the Office of Management and Budget under that 
order. It is not significant under the regulatory policies and 
procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979).
    The Coast Guard expects the economic impact of this regulation to 
be so minimal that a full regulatory evaluation under paragraph 10e of 
the regulatory policies and procedures of DOT is unnecessary. The 
safety zone established by this regulation encompasses only one mile of 
the Columbia River adjacent to Vancouver, Washington. Entry into the 
safety zone will be restricted each year for only three hours on the 
day of the event. These restrictions would have little effect on 
maritime commerce in the area.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this regulation will have a 
significant economic impact on a substantial number of small entities. 
``Small entities'' may include (1) small businesses and not-for-profit 
organizations that are independently owned and operated and are not 
dominant in their fields and (2) governmental jurisdictions with 
populations of less than 50,000. Because it expects the impact of this 
regulation to be minimal, the Coast Guard certifies under 5 U.S.C. 
605(b) that this regulation will not have a significant economic impact 
on a substantial number of small entities.

Collection of Information

    This regulation contains no collection of information requirements 
under the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this action in accordance with the 
principles and criteria contained in Executive Order 12612 and has 
determined that this regulation does not have sufficient federalism 
implications to warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this 
regulation and concluded that, under paragraph 2.B.2 of Commandant 
Instruction

[[Page 18949]]

M16475.1B (as revised by 59 FR 38654; July 29, 1994), the regulation is 
categorically excluded from further environmental documentation. 
Appropriate environmental analysis of the Fort Vancouver Fourth of July 
Fireworks Display will be conducted in conjunction with the marine 
event permitting process each year. Any environmental documentation 
required under the National Environmental Policy Act will be completed 
prior to the issuance of a marine event permit for this event should 
such a permit be required.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reports and 
recordkeeping requirements, Security measures, Waterways.

Final Regulation

    For the reasons set out in the preamble, the Coast Guard amends 
Part 165 of Title 33, Code of Federal Regulations, as follows:

PART 165--[AMENDED]

    1. The authority citation for Part 165 continues to read as 
follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; CFR 1.05-1(g), 6.04-1, 
6.04-6 and 160.5; 49 CFR 1.46.

    2. A new section 165.1308 is added to read as follows:

Sec. 165.1308  Columbia River, Vancouver, WA.

    (a) Location. The following area is a safety zone: All waters of 
the Columbia River at Vancouver, Washington, bounded by a line 
commencing at the northern base of the Interstate 5 highway bridge at 
latitude 45 deg.37'17'' N, longitude 122 deg.40'22'' W; thence south 
along the Interstate 5 highway bridge to latitude 45 deg.37'03'' N, 
longitude 122 deg.40'32'' W; thence to latitude 45 deg.36'28'' N, 
longitude 122 deg.38'35'' W; thence to Ryan's Point at latitude 
45 deg.36'42'' N, longitude 122 deg.38'35'' W; thence along the 
Washington shoreline to the point of origin. [Datum: NAD 83].
    (b) Effective dates. This section is effective annually on July 
fourth from 9 p.m. to 11 p.m. (PDT) unless otherwise specified by 
Federal Register notice.
    (c) Regulation. In accordance with the general regulations in 
Sec. 165.23 of this part, entry into this safety zone is prohibited 
unless authorized by the Captain of the Port, Portland, Oregon.

    Dated: April 18, 1996.
C.E. Bills,
Captain, U.S. Coast Guard Captain of the Port.
[FR Doc. 96-10559 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-10557 Special Anchorage Areas; Herb River, Thunderbolt, GA; Bull River, Savannah, GA; South Channel Savannah River East, Savannah, GA; South Channel Savannah River West, Savannah, GA; Calibogue Sound, Hilton Head, SC; May River, Hilton Head, SC
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18944-18946]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10557]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 110

[CGD07-95-033]
RIN 2115-AA98

Special Anchorage Areas; Herb River, Thunderbolt, GA; Bull River, 
Savannah, GA; South Channel Savannah River East, Savannah, GA; South 
Channel Savannah River West, Savannah, GA; Calibogue Sound, Hilton 
Head, SC; May River, Hilton Head, SC

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing six temporary special 
anchorage areas during the 1996 Centennial Olympic Games. These special 
anchorage areas become effective on July 4, 1996, at 7 a.m. EDT 
(Eastern Daylight Time), and terminate on August 5, 1996, at 11 p.m. 
EDT. The Coast Guard expects a significant number of spectator vessels 
to participate in the festivities surrounding the 1996 Olympic Games. 
By designating special anchorage areas the Coast Guard expects to 
minimize the problems associated with a large congestion of boaters in 
the area.

EFFECTIVE DATES: This rule is effective at 7 a.m. EDT, on July 4, 1996, 
and terminates at 11 p.m. EDT, on August 5, 1996.

ADDRESSES: Copies of documents referenced in this document are 
available for inspection or copying from Marine Safety Office, 
Savannah, 222 W. Ogelthorpe Avenue, Suite 402, Savannah, Georgia 
between 9 a.m. and 3 p.m. EDT, Monday through Friday, except Federal 
holidays. A copy of the environmental assessment is available from CEU 
Miami, 909 S.E. 1st Ave., Miami, Florida 33131.

FOR FURTHER INFORMATION CONTACT:
LT J. Simmerman, project officer for the Captain of the Port, or BMC P. 
Webber, Marine Safety Office Savannah at Tel: (912) 652-4353, between 
the hours of 7:30 a.m. and 4 p.m. EDT, Monday through Friday, except 
holidays.

SUPPLEMENTARY INFORMATION: 

Regulatory History

    On October 13, 1995, the Coast Guard published a Notice of Proposed 
Rulemaking (NPRM) in the Federal Register (60 FR 53317) entitled 
``Special Anchorage Areas; Herb River, Thunderbolt, GA; Bull River, 
Savannah, GA; South Channel Savannah River East, Savannah, GA; South 
Channel Savannah River West, Savannah, GA; Calibogue Sound, Hilton 
Head, SC; May River, Hilton Head, SC'' (CGD07-95-033). Three comments 
were received in response to the NPRM.

Discussion of Comments and Changes

    All of the comments received addressed the proposed May River 
special anchorage area, proposed Sec. 110.T72e(f). These comments 
addressed concerns that establishment of the May River anchorage as 
proposed would not allow for safe navigation of recreational and 
commercial vessels by residents who live along the May River west of 
the proposed anchorage area. Based on these comments, proposed 
Sec. 110.T72e(f) has been modified in this final rule to decrease the 
anchorage area, restricting the anchorage area to the southern half of 
the May River. This change in area will allow for safe passage of 
commercial and recreational vessels in the northern side of the 
channel. The description of the May River anchorage area now appears in 
Sec. 110.72e(a)(6). Additionally, an

[[Page 18945]]

effective date paragraph has been added to the section to make it clear 
that these special anchorage areas will only be in effect from July 4, 
1996 until August 5, 1996.

Discussion of Regulations

    Approximately 1,000 to 2,000 spectator vessels are expected to 
arrive and participate in the festivities of the 1996 Olympic sailing 
competition. The Coast Guard is establishing six special anchorage 
areas to alleviate the problems of a large congestion of recreational 
boats in a small area. By designating these special anchorages, the 
Coast Guard anticipates minimizing the associated problems with 
security and pollution, as well as the commercial congestion that a 
large influx of boaters might cause in the area. Vessels no more than 
sixty-five feet in length when anchored at any special anchorage area 
are not required to carry or exhibit the white anchor lights normally 
required by the Navigation Rules. These special anchorage regulations 
will be effective from July 4, 1996, at 7 a.m. EDT, until August 5, 
1996, 11 p.m. edt.
    Six special anchorage areas are being established in the following 
locations: (1) Herb River; from the mouth of the Herb River to just 
before Country Club Creek. (2) Bull River; south from the Bull River 
Bridge to the mouth of Lazaretto Creek. (3) The South Channel of the 
Savannah River west; extending from Elba Island Cut southeast to the 
Fort Pulaski Bridge. (4) The South Channel of the Savannah River east; 
extending from Fort Pulaski Bridge east to the entrance of Lazaretto 
Creek. (5) Calibogue Sound; south of the entrance of Harbourtown to 
Braddock Point. (6) May River; west of buoy 4 in the vicinity of Bass 
Creek to buoy 5 prior to the mouth of Bull Creek.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation under paragraph 
10e of the regulatory policies and procedures of DOT is unnecessary.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard considered whether this rule will have a significant effect 
on a substantial number of small entities. ``Small entities'' may 
include (1) small businesses and not for profit organizations that are 
independently owned and operated and are not dominant in their fields 
and (2) governmental jurisdictions with populations of less than 
50,000.
    Over 1100 athletes and coaches representing over 80 countries, over 
300 competition vessesls, as well as approximately 1,000 to 2,000 
support and spectator vessels are expected to arrive and participate in 
the festivities of the 1996 Olympic yatching competition. The special 
anchorage areas described in this rule will be established for a 
limited time period to help accommodate this large volume of spectator 
vessels in the port of Savannah. The boundaries of the anchorage areas 
have been tailored to reduce congestion while still allowing for safe 
navigation of the waterways by commercial and recreational vessels.
    For the reasons discussed above, the Coast Guard certifies under 
section 605(b) of the Regulatory Flexibility Act (5 U.S.C. et seq.) 
that this rule will not have a significant economic impact on a 
substantial number of small entities.

Collection of Information

    This rule contains no collection-of-information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that the rulemaking does not have sufficient federalism implications to 
warrant the preparation of a Federalism Assessment.

Environmental Assessment

    The Coast Guard has considered the environmental impact of this 
action and has determined pursuant to Section 2.B.2. of Commandant 
Instruction M16475.1B, that this action is categorically excluded from 
further environmental documentation.
    A Categorical Exclusion Determination and Categorical Exclusion 
Checklist are available in the docket for inspection or copying at the 
location listed in ADDRESSES. In addition the environmental analysis 
above, an Environmental Assessment (EA) and Finding of No Significant 
Impact (FONSI) has been issued for the area during the 1996 Olympic 
Yachting Competition. A copy of the EA and FONSI is available for 
copying and inspection at the location listed in ADDRESSES.

List of Subjects in 33 CFR Part 110

    Anchorage grounds.

Final Regulations

    In consideration of the foregoing, Part 110 of Title 33, Code of 
Federal Regulations, is amended as follows:

PART 110--[AMENDED]

    1. The authority citation for Part 110 continues to read as 
follows:

    Authority: 33 U.S.C. 471, 2030, 2035, and 2071; 49 CFR 1.46 and 
33 CFR 1.05-1(g). Section 110.1a and each section listed in 110.1a 
are also issued under 33 U.S.C. 1223 and 1231.

    2. A new temporary Sec. 110.72e is added to read as follows:

Sec. 110.72e  Savannah Olympic Anchorage Areas, GA.

    (a) Anchorage Areas. The following locations are special anchorage 
areas (All coordinates referenced used Datum: NAD 1983):
    (1) Herb River Anchorage. The waters in Herb River within the area 
bounded at latitude 32 deg.01'.2'' N, extending south to a line at 
latitude 32 deg.00'.0'' N.
    (2) Bull River Anchorage. The waters of Bull River within the area 
bounded at latitude 32 deg.02'.2'' N, east to a line at latitude 
31 deg.59'.7'' N across Bull River.
    (3) South Channel of the Savannah River West Anchorage. The waters 
of the South Channel of the Savannah River lying between latitude 
32 deg.04'.1'' N, extending east to a line of longitude 080 deg.54'.9'' 
W in the vicinity of the Fort Pulaski Bridge.
    (4) South Channel of the Savannah River East Anchorage. The waters 
of the South Channel of the Savannah River lying east of the Fort 
Pulaski Bridge, beginning at longitude 080 deg.54'.9'' W, extending 
east to longitude 080 deg.53'.9'' W across South Channel.
    (5) Calibogue Sound Anchorage. The waters of Calibogue Sound lying 
within the following coordinates, the area west of the west shore of 
Hilton Head Island; starting at

32 deg.08'12.0'' N, 080 deg.48'55.0'' W; thence to,
32 deg.08'12.0'' N, 080 deg.49'13.0'' W; thence to,
32 deg.06'50.0'' N, 080 deg.49'55.0'' W; thence to,
32 deg.06'50.0'' N, 080 deg.49'43.0'' W; back north on the west shore 
of Hilton Head Island to the point of beginning.

    (6) May River Anchorage. The waters of May River within the 
following

[[Page 18946]]

coordinates, the area north of the north shore of Bull Island; 
beginning at

32 deg.11'45.0'' N, 080 deg.48'03.0'' W; thence to,
32 deg.11'52.0'' N, 080 deg.48'02.0'' W; thence to,
32 deg.12'00.0'' N, 080 deg.48'17.0'' W; thence to,
32 deg.12'19.0'' N, 080 deg.49'35.0'' W; thence to,
32 deg.12'09.0'' N, 080 deg.49'43.0'' W; back east along the north 
shore of Bull Island to the point of beginning.

    (b) Effective dates. This section is effective on July 4, 1996, at 
7 a.m. EDT, and terminates on August 5, 1996, at 11 p.m. EDT.

    Dated: April 23, 1996.
Roger T. Rufe, Jr.,
Rear Admiral, U.S. Coast Guard Commander, Seventh Coast Guard District.
[FR Doc. 96-10557 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-10556 Safety/Security Zone Regulations; Savannah, GA
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18949-18958]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10556]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 165

[CGD07-95-062]
RIN 2115-AA97

Safety/Security Zone Regulations; Savannah, GA

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing safety and security zones to 
protect life, property, and the environment during the 1996 Olympic 
Yachting Competition. The anticipated concentration of spectator and 
participant vessels associated with these races pose safety and 
security concerns. These regulations are intended to provide security 
for the Olympic participants and to insure safe navigation on the 
waters surrounding the Olympic Village located on the Savannah River, 
the two Olympic Marinas, the racing venues offshore, and the ferrying 
of athletes and officials between Olympic Marina locations.

EFFECTIVE DATES: This rule is effective from July 4, 1996 until August 
4, 1996.

ADDRESSES: Copies of documents referenced in this document are 
available for inspection or copying from Marine Safety Office, 
Savannah, 222 W. Ogelthorpe Avenue, Suite 402, Savannah, Georgia 
between 9 a.m. and 3 p.m. EDT (Eastern Daylight Time), Monday through 
Friday, except Federal holidays. A copy of the environmental assessment 
is available from CEU Miami, 909 S.E. 1st Ave., Miami, Florida 33131.

FOR FURTHER INFORMATION CONTACT:
BMC P.M. Webber or LT L.L. Fagan, Project Officer for Captain of the 
Port, Marine Safety Officer, Savannah at (912) 652-4353, between the 
hours of 7:30 a.m. and 4 p.m. EDT, Monday through Friday, except 
holidays.

SUPPLEMENTARY INFORMATION: Over 1100 athletes and coaches representing 
over 80 countries, over 300 competition vessels, as well as 
approximately 1,000 to 2,000 support and spectator vessels are expected 
to arrive and participate in the festivities of the 1996 Olympic 
yachting competition. To ensure the security of the athletes and to 
ensure the safety of the large volume of recreational vessels expected 
in the area, the Coast Guard is establishing these safety/security 
zones to provide for the safety and security of the Olympic 
participants and spectators.

Regulatory History

    On January 3, 1996, the Coast Guard published a Notice of Proposed 
Rulemaking (NPRM) entitled ``Safety/Security Zone Regulations; 
Savannah, GA'' (CGD 07-95-062) in the Federal Register (61 FR 136). Due 
to requests, a public meeting, announced in the February 16, 1996 
Federal Register (61 FR 6178), was held in Savannah by the Captain of 
the Port Savannah on February 29, 1996 to gather comments on the 
rulemaking. The meeting was attended by over 100 individuals. Twenty-
six people made comments during the meeting and 17 written comments 
were submitted prior to closure of the comment period on March 4, 1996. 
Copies of the comments and an audio tape of the meeting are available 
for inspection or copying where indicated under ADDRESSES. The Coast 
Guard published a related Notice of Proposed Rulemaking on October 10, 
1995 (60 FR 53317), which proposed anchorage areas in the same general 
area as the safety/security zones during the Olympic Yachting Event. 
The final rule on the anchorage areas is published elsewhere in today's 
Federal Register.

Discussion of Comments and Changes

    The Coast Guard received forty-three separate comments on the NPRM 
during the comment period. The commentors fit into the following 
general categories: concerns from businesses on Bull River, Turner 
Creek, or Half Moon River; concerns from citizens living on these 
waterways or with vessels moored in effected areas; and concerns 
registered by or on behalf of the Atlanta Committee for the Olympic 
Games (ACOG). The Coast Guard received two comments from private 
citizens who fully supported the safety/security zones as proposed, 
stating that the Coast Guard had achieved a good balance between 
navigational interests and interest in security for the Olympic 
athletes. The comments which addressed specific proposed safety/
security zones are discussed below by zone. General comments which 
pertain to all of the area are grouped by subject and are discussed 
following the discussion by specific zones.
    The environmentally based constraints that were proposed as part of 
the NPRM have been incorporated as conditions in the permit issued by 
the Coast Guard to the ACOG for the water events. As a result, 
therefore, these restrictions have been eliminated from

[[Page 18950]]

the final rule. The Coast Guard has completed an Environmental 
Assessment, with a finding of no significant impact, for all Olympic 
activities in the area as discussed in the ``Environmental Assessment'' 
section below.

Savannah River; Olympic Torch Moving Safety Zone (Proposed Section 
165.T07-077)

    No Comments specifically addressed the Olympic Torch proposed 
moving safety zone. The effective date of the moving safety zone has 
been changed from July 10 to July 9, 1996. The duration of the 
effective time of the zone has been reduced from the NPRM, which had 
proposed an effective zone that lasted from 8 a.m. to 10 p.m. EDT. The 
moving safety zone will instead be effective from 6 p.m. to 10 p.m. 
EDT. The exact route of the torch is uncertain at this time. The zone 
will commence either, on the Savannah River in the vicinity of Coast 
Guard Station Tybee and continue west up river to the Highway 17A 
bridge (Talmadge bridge), or at the mouth of the Wilmington River and 
proceed to the Savannah River via the Intracoastal Waterway (ICW) and 
thence to the Highway 17A bridge. The Captain of the Port Savannah will 
announce the exact route for the vessel and its moving safety zone via 
Broadcast Notice to Mariners prior to the establishment of the zone.

Savannah River: Fireworks Safety Zone (Proposed Section 165.T07-078)

    No comments were received on the proposed safety zone for the 
fireworks display. The effective time of the zone on July 4, 1996 has 
been moved up from the proposed starting time of 10 p.m. to 9:15 p.m. 
EDT. The zone will still terminate at 11 p.m. EDT.

Marriot Hotel/Olympic Village (Proposed Section 165.T07-062(1))

    No comments specifically addressed the Olympic Village proposed 
zone and therefore it is being adopted in this final rule as proposed 
with a minor change in coordinates required to accurately delineate the 
zone.

Olympic Marina; Wilmington River and Turner Creek (Proposed Section 
165.T07-062(2))

    The NPRM proposed a zone that included a portion of Turner Creek 
and extended out to the center of the Wilmington River, surrounding the 
Olympic Marina and its docks. Olympic athletes will board vessels at 
the Olympic Marina and be shuttled to the Day Marina in Wassaw Sound. 
The Day Marina is the staging area for all the yachting events and is 
the area where the vessels used in competition will be moored. As 
proposed, entry into the Olympic Marina zone, including portions of 
Turner Creek and the Wilmington River, would be prohibited unless 
permission was granted by the Captain of the Port. The Coast Guard had 
planned to grant permission for entry to groups of vessels and provide 
Coast Guard escorts for their transit through the zone, thereby 
allowing controlled access to the Wilmington River through Turner 
Creek.
    The Olympic Marina zone, as proposed, extended south of the Olympic 
Marina in the Wilmington River to encompass a number of private docks. 
To address the access problem this would have caused for the dock 
owners, the Coast Guard has modified the boundaries of the Olympic 
Marina zone so that the zone ends just north of the first private dock, 
thereby allowing free access from these docks to the Wilmington River.
    The Coast Guard received a number of comments concerning the 
anticipated effects of closing Turner Creek and parts of the Wilmington 
River and concerning the expected delays which would result from the 
plan to escort groups of vessels through the area. Commentors included 
two private individuals who live in homes with private docks on the 
Wilmington River that were encompassed within the proposed Olympic 
Marina zone and business owners along Turner Creek who were concerned 
with the impact the delays and lack of access would have on their 
business.
    In their comments, several business owners along Turner Creek 
expressed concerns with the Coast Guard's proposed plan to escort 
vessels in groups through Turner Creek to the Wilmington River. The 
commentors noted that this area experiences a heavy volume of vessel 
traffic and large delays were anticipated as a result of the 
restrictions. Based on these comments, and after consultation with the 
ACOG about the security concerns, the Coast Guard has decided not to 
escort vessels in groups through this zone. Instead, if vessels desire 
to transit through the Olympic Marina zone, a vessel may check in with 
the Coast Guard to receive permission to enter. The Captain of the Port 
(COTP) may grant permission for vessels to enter the Olympic Marina 
zone whenever circumstances allow. COTP permission will be granted with 
the condition that the vessels transit the zone without stopping within 
the zone.
    Two comments at the public meeting and one written comment 
concerned the designation of this area as a ``no wake zone.'' The 
declaration of an area as a ``no wake zone'' is done by the State of 
Georgia and not the Coast Guard. Therefore, those comments have been 
passed to the responsible state officials for their consideration.

Wilmington River and Wassaw Sound (Moving Security Zone) (Proposed 
Section 165.T07-062(3))

    No comments specifically addressed this proposed zone. The 
description of this zone has been modified to clarify the route that 
the vessels ferrying the athletes between the Olympic Marina and the 
Day Marina will take. These vessels will transit from the Olympic 
Marina in the Wilmington River to Tybee Cut, through Tybee Cut to Half 
Moon River and into Wassaw Sound were the Day Marina is located. The 
same route is planned for the return trip.

Bull River (Proposed Section 165.T07-062(4))

    This was the most commented on of the proposed zones. The zone, as 
proposed, would close the southern entrance to Bull River at Pa Cooper 
Creek and would close Tybee Cut in the event of adverse weather. The 
proposed zone encompassed the Day Marina and provided for a less 
crowded route for the ferries shuttling the athletes between the 
Olympic Marina and the Day Marina.
    The Coast Guard received eleven comments from business owners along 
the Bull River objecting to this proposed zone. These businesses fall 
into two primary categories; those that operate commercial vessels from 
dock facilities and those with fixed shore-based operations, such as 
restaurants or marinas. Most of the comments expressed concern that the 
Coast Guard was being overly restrictive with regard to access to 
Wassaw Sound and Bull River. The comments expressed a shared opinion 
that business in this area would be significantly affected by the 
proposed closing of the entrance to Bull River during the day. Fixed 
shore based operations expressed concerns that customers would not be 
able to reach the businesses and operators of commercial vessels moored 
at docks in the area expressed concern that they would have to leave 
the zone early in the day and not return until the evening. The 
comments pointed out that though there is an alternate route between 
this portion of the Bull River and Wassaw Sound via the Wilmington 
River, there are fixed span bridges over the Bull River which limits 
the size of vessels able to use this route. Hence, the only outlet for 
vessels with height

[[Page 18951]]

restrictions is out the mouth of the Bull River.
    Conversely, the ACOG also expressed concerns about the proposed 
Bull River zone, stating that the zone as proposed was not restrictive 
enough. The ACOG requested that the Coast Guard also close the Half 
Moon River northwest of Tybee Cut, thereby including all of Tybee Cut 
within the zone during all times that the zone was in effect, not just 
during adverse weather as proposed. In its comments, the ACOG noted 
that Tybee Cut was chosen for transiting athletes for a number of 
reasons. Tybee Cut provides a route which is more protected from 
adverse weather as well as providing a shorter transit that does not 
interfere with racing in the Alpha race course (located in Wassaw 
Sound). The ACOG also pointed out that the only alternate route 
available for ferrying athletes between the Olympic Marina and the Day 
Marina was down the Wilmington River and then through Wassaw Sound. 
This route is considered unacceptable by the ACOG. Not only is the 
route longer and more prone to adverse weather, but more importantly it 
dramatically increases the athletes' exposure to the large number of 
commercial and recreational vessels expected to be transiting through, 
and congregating at, the mouth of the Wilmington River. The comment 
from the ACOG also noted that the Coast Guard had proposed July 6, 1996 
as the starting date for the safety/security zones, but that in the 
ACOG's opinion, the zones would not be needed until July 8. The ACOG 
suggested that the Coast Guard delay the effective date for the Bull 
River zone to July 8, 1996.
    The Coast Guard has reviewed the concerns expressed by the 
businesses and individuals regarding access to Wassaw Sound and Bull 
River, but must balance their need for access with the need for Olympic 
athletes' security. The Bull River area will be heavily used by Olympic 
athlete shuttles and affiliated Olympic vessels. The security zone 
boundaries and effective dates have been carefully tailored to ensure 
the need for athlete security is met. The Coast Guard agrees with the 
ACOG's concerns for security in this area. The Day Marina, which is the 
center of activity for the Olympic yachting events, consists of a group 
of barges moored in the water and is exposed on all sides. The vessels 
participating in the Olympic yachting races will be moored at the 
marina and will be transiting between the Day Marina and the race 
courses throughout the day. Large concentrations of athletes will be 
present at the marina throughout the day as well. Additionally, as the 
ACOG commented, because of the high concentration of spectator and 
commercial vessels expected in the Wilmington River near Wassaw Sound, 
ferrying athletes out the Wilmington River and into Wassaw Sound from 
the south will expose the athletes to a higher security risk. The Coast 
Guard is also concerned with navigational safety in this area. Wassaw 
Sound consists primarily of shoal waters, which create extremely 
hazardous conditions if the area becomes congested with vessels. For 
these reasons it would be extremely difficult to allow unimpeded vessel 
traffic in this area while still ensuring the safety of the Olympic 
athletes and of boaters.
    In response to these comments, in the final rule the Coast Guard 
has modified the boundaries and the effective times of the Bull River 
zone to improve accessibility while still ensuring the need for athlete 
security is met. Based on the ACOG's concerns for athlete security, a 
security/safety zone will close all of Tybee Cut and a portion of the 
Half Moon River to unaffiliated vessels from July 6 until August 2, 
1996 from 8 a.m. to 7 p.m. EDT daily. Unaffilated vessels are defined 
as all vessels that are not registered with the ACOG or designated as 
an Official Vessel by the Coast Guard Captain of the Port. However, 
after internal discussions within the Coast Guard and in consultation 
with the ACOG, the Coast Guard has decided that from July 6 through 18, 
1996, Tybee Cut and parts of the Half Moon River is the only part of 
the proposed Bull River zone which will be in effect (Tybee Cut/Half 
Moon River zone). From July 19 through August 2, 1996, the safety/
security zone in this area will encompass all of the Tybee Cut/Half 
Moon River zone plus a portion of the Bull River. However, the boundary 
proposed in the NPRM across the Bull River has been shifted south in 
the final rule. The boundary of the proposed Bull River zone ran from 
Pa Cooper Creek due east to the marsh adjacent to the entrance to Bull 
River. The new boundary line spans the Bull River farther south, and 
provides a one hour window, for passage thru Tybee Cut from 1 p.m. to 2 
p.m. From July 19 to August 2, Wassaw Sound will be inaccessible from 
Bull River from 8 a.m. to 7 p.m. EDT daily. Tybee Cut will be used by 
the Athlete Shuttles and affiliated vessels from 8 a.m. to 1 p.m. EDT 
and from 2 p.m. to 7 p.m. EDT daily. Unaffiliated vessels will be 
allowed access to Tybee Cut, the Half Moon River, and the Bull River 
from 1 p.m. to 2 p.m. EDT daily. However, unaffiliated vessels will not 
be allowed to proceed south of the line described in section 165.T07-
062(a)(5). This one hour access window may slide to a later time if 
race delays occur. Additionally, from 7 p.m. to 8 a.m. EDT daily, 
unrestricted access to Tybee Cut, the Half Moon River and the Bull 
River will be allowed.
    The Olympic yachting events do not begin until July 19, though 
athletes will be in the area beginning July 6, 1996. The Coast Guard 
has decided that despite the ACOG's opinion that this zone need not be 
effective until July 8, it is necessary that a zone encompassing Tybee 
Cut be effective July 6. Beginning July 6, 1996, all of the waterside 
venues will be considered as being under the ``Olympic umbrella'' and 
athletes will have full access to all venues. Therefore, as athletes 
will be ferried through Tybee Cut beginning July 6, 1996, that date 
will remain as the effective date for the Tybee Cut/Half Moon River 
zone.
    Between July 6 and 19, 1996, the eastern boundary of the safety/
security zone closing Tybee Cut, the Tybee Cut/Half Moon River zone, 
will be the eastern entrance of the Half Moon River on the Wassaw 
Sound. This modification will allow vessels to navigate between the 
Bull River and Wassaw Sound west of Wassaw Breaker throughout that time 
period. Access between Bull River and Wassaw Sound, east of Wassaw 
Breaker, is restricted by the 200 yard fixed safety/security zone 
around the Day Marina. However, the Coast Guard notes that due to tidal 
changes in this area, the access between Bull River and Wassaw Sound 
west of Wassaw Breaker will be a viable alternative for vessel transit 
only at certain tides. As with the proposed Bull River zone, the Tybee 
Cut/Half Moon River zone will only be in effect from 8 a.m. to 7 p.m. 
EDT, thereby allowing free transit of vessels throughout almost all of 
this area during the evening. This zone is described in Sec. 165.T07-
062(a)(4).
    In light of the modifications to the proposed Bull River zone 
discussed above, and to address security concerns in the immediate 
vicinity of the Day Marina, this final rule contains a new safety/
security zone in Wassaw Sound, described in Sec. 165.T07-062(6), which 
extends in a radius of 200 yards around the Day Marina. This zone will 
be in effect twenty-four hours a day from 8 a.m. EDT July 6, 1996 
through 7 p.m. EDT August 2, 1996. The COTP anticipates granting 
permission for vessels to transit through this zone from 7 p.m. to 8 
a.m. EDT daily, under the condition that vessels remain at a

[[Page 18952]]

distance of at least 50 yards from the Day Marina.
    The Coast Guard received one comment seeking a dedicated small 
vessel viewing area within the Bull River zone to allow spectator 
vessels to view the races. In response to this comment as discussed 
above, the proposed security zone boundary across the Bull River has 
been shifted south in the final rule. This modification is in addition 
to the fact that, as discussed above, access to and from the Bull River 
west of Wassaw Breaker will not be effected until July 19. The new 
boundary line spans the Bull River farther south, though the resulting 
zone (termed the Tybee Cut/Bull River/Half Moon River zone) effectively 
closes the eastern and western entrance to Half Moon River in addition 
to closing off access to Tybee Cut. This zone is now described in 
Sec. 165.T07-062(a)(5). This southern shift in the zone boundary will 
allow small vessels to get closer to the racing areas without 
compromising safety or security. The Tybee Cut/Bull River/Half Moon 
River zone does not prevent small vessels from viewing the event from 
outside the security zone perimeter. Also as discussed above, Wassaw 
Sound will be inaccessible from Bull River from July 19 to August 2, 
1996, but unaffiliated vessels will be allowed access to Tybee Cut, the 
Half Moon River, and the Bull River from 1 p.m. to 2 p.m. EDT daily 
provided unaffiliated vessels do not proceed south of an alternate line 
described in section 165.T07-062(a)(5). This one hour access window may 
slide to a later time if race delays occur. The ACOG has agreed not to 
run ferries through Tybee Cut during this time to allow unimpeded 
access. This window should allow adequate time for vessels to transit 
without jeopardizing security. After the Olympic events are completed 
for the day, from 7 p.m. to 8 a.m. EDT daily, the zone will not be 
effective and therefore access to Tybee Cut, the Half Moon River and 
the Bull River will be allowed.
    A number of comments expressed concern about the closing of Tybee 
Cut and the effect on boating safety that may have in regard to vessels 
seeking to return to port in the case of adverse weather. The Coast 
Guard is concerned with ensuring vessel safety, but notes that access 
to Tybee Cut is not required to ensure vessels can reach a safe harbor 
in case of adverse weather. Although the Coast Guard recognizes that 
Wassaw Sound can get choppy in adverse weather, once a vessel reaches 
the vicinity of Cabbage Island, an area outside all of the safety/
security zones, calmer water can be found. There are also marinas 
available and accessible along the southern end of the Wilmington River 
at which vessels may moor. Therefore, it is the Coast Guard's opinion 
that due to available alternatives, Tybee Cut need not remain open to 
ensure the safety of vessels in the area.
    The Coast Guard received one comment from the owner of commercial 
towing business located on Half Moon River. This individual had 
purchased property on this waterway due to its proximity to the Olympic 
venues and was concerned that he would be unable to leave his property. 
The comment stated that the location was selected partially based on 
conversations with Coast Guard officials last year who had expressed a 
need for commercial towing assistance during the Olympics. The Coast 
Guard notes that the boundaries of the zones in this area, both the 
Tybee Cut/Half Moon River and Tybee Cut/Bull River/Half Moon River, are 
carefully tailored to meet the need for security for Olympic athletes 
and officials. The property which is the subject of the comment is a 
private residence which provides a convenient area for mooring a tow 
vessel. Although the Coast Guard realizes that mooring this vessel at 
another location may be inconvenient, there are a number of available 
marinas and other areas which may be used by this business as a staging 
area to provide commercial towing assistance. Access to half Moon River 
and Tybee Cut is not needed to tow any vessel for safety or repairs. As 
discussed above, and in part to provide this business with some 
flexibility while at the same time providing for navigational safety 
and security, the zones in the Half Moon River area, Sec. 165.T07-
062(a)(4), have been revised to open a one hour window of opportunity 
for accessibility via Tybee Cut and Half Moon River in addition to the 
7 p.m. to 8 a.m. EDT accessibility. Businesses with mobile assets such 
as this, or vessels with draft restrictions, are advised to seek other 
staging or embarkation points if additional flexibility is needed.
    The Coast Guard received several comments at the public meeting and 
seven written comments which addressed the perceived hardships the 
proposed zones would have on the charter boat industry and marinas 
which operate in and around the Bull River. These comments represented 
the interests of vessel owners whose primary business is fishing 
charters, vessels that have been chartered to carry spectators, and two 
marinas on the Bull River that cater to charter vessels and sailboats. 
The change in effective dates of the zone, specifically, the opening of 
access between the Bull River and Wassaw Sound between July 6 through 
July 18, 1996 should help alleviate many of these businesses concerns. 
For the period of time when access to the Bull River is closed off or 
tidal conditions make access between the Bull River and Wassaw Sound 
difficult for draft restricted vessels, as discussed above, there are 
several alternate routes vessels may take to transit between the Bull 
River and Wassaw Sound. The most direct route is directly out the mouth 
of the Bull River into the Sound, west of Wassaw Breaker. Subject to 
tidal state, this route will be available from July 6 through 18 as a 
result of the modifications in this final rule. Under both the proposed 
and final rule, this route is also available every evening from 7 p.m. 
to 8 a.m. EDT. A second route is up the Bull River to Turner Creek and 
then into the Wilmington River. The second option requires a vessel to 
clear the upstream fixed span Route 80 bridge, which has a vertical 
clearance of 20 feet spanning the Bull River, en route to the 
Wilmington River. Three comments noted that any non-direct route 
between the Bull River and Wassaw Sound would add significant time to 
each trip, with estimates ranging from one to three hours additional 
transit time in each direction for vessels transiting between the Bull 
River and Wassaw Island, a traditional fishing ground. Most of the 
vessels affected by this rule are either too tall to clear the bridge 
or can do so only during certain tidal conditions. Additionally, one 
comment noted that even for vessels that can clear the bridge, the 
added time would make the normal fishing charter trip, which travels to 
the southeast of Wassaw Island, unmanageable in a typical eleven hour 
fishing day. The problem is aggravated by the fact that July and 
August, the times when the Bull River zone will be effective, is the 
charter industry's peak season. The marinas also commented that they 
expected to lose revenues as a result of the loss of charter boat 
business, loss in fuel sales and loss in dockage fees from sailboats. 
Restaurants and marina operators also commented that they expect to 
lose business because of the restrictions imposed by the proposed Bull 
River zone. Additionally, the marinas anticipated that the loss in 
dockage fees would continue in the future, citing a perceived trend 
that once someone changed to a new marina, they seldom return the 
following year.
    The Coast Guard notes that portions of the Bull River, up river 
from the Tybee Cut/Bull River/Half Moon River

[[Page 18953]]

security/safety zone are being designated as a special anchorage area 
in a separate final rule. As a result, a large increase in smaller 
vessels and their passengers can be anticipated in the river. Many of 
these vessels will not be constrained by the limited clearance of the 
fixed span bridge and will be able to transit between the Bull River 
and Wilmington River during all times of the day. These vessels will be 
able to utilize any dock space vacated by the larger vessels. 
Additionally, the large number of people and vessels expected to use 
the anchorage area and the Bull River in general during the Olympics 
should help alleviate some of the lost revenue for businesses along 
Bull River. Any anticipated future losses are merely speculative. The 
Coast Guard estimates that overall in the Savannah area there will be 
an increase of 1000-2000 vessels during the time period when this rule 
is in effect. The ACOG estimates that each day its vessels and 
officials alone will use between 7,000 and 10,000 gallons of gasoline, 
two tons of ice, and eat over 1600 lunches. Those estimates are in 
addition to the need for similar items for the over 1500 volunteers who 
will be assisting with the events and for the support boats for the 
racing teams which will be used through July 19. It is inevitable that 
with all of the expected vessels, there will also be a large demand for 
vessel repairs.
    In regard to the larger vessels, the Coast Guard is aware of the 
inconveniences that the operation of the zone will cause, but notes 
that there are other locations where these vessels can dock or anchor 
that are not affected by any of the zones. The boundaries of the Tybee 
Cut/Bull River/Half Moon River zone, as well as all the safety/security 
zones being adopted by this final rule, have been narrowly tailored to 
provide adequate security while still providing for the interests of 
navigation. The Coast Guard notes that access from the Bull River to 
Wassaw Sound will only be restricted during the days and times that the 
majority of athletes and officials will be present. This will allow 
access between the Bull River and Wassaw Sound during the evening and 
from July 6 to July 18, 1996. Additionally, as discussed above, the 
Captain of the Port anticipates granting general permission for all 
vessels to transit between the Bull River and Half Moon River and 
through Tybee Cut for an hour each afternoon, usually from 1 to 2 p.m. 
EDT, to allow greater accessibility between Bull River and Wassaw 
Sound.

Atlantic Ocean and Wassaw Sound Zone (Proposed Section 165.T07-062(5))

    The Coast Guard received three comments concerning the Atlantic 
Ocean/Wassaw Sound zone. The first of these comments suggested that 
vessels and operators be allowed access to the Atlantic Ocean/Wassaw 
Sound zone after successfully undergoing a security screen. A second 
related comment sought access to the northern side of Wassaw Sound for 
a commercial charter business. The combination of security and safety 
concerns in the Atlantic Ocean/Wassaw Sound zone area combine to 
prohibit the entrance of any unaffiliated vessels into this zone. The 
implementation of a security screen by the Coast Guard would pose 
significant security and traffic management problems that would far 
outweigh any benefits that may result. Therefore, the Coast Guard is 
not adopting that suggestion and is not allowing access into this zone. 
Due to the over 280 competition vessels and 200 powered support vessels 
operating and racing in the area, this and the other safety/security 
zones are expected to experience a high degree of congestion during the 
Olympic races. The Coast Guard believes that to additionally allow the 
heavy concentration of recreational and commercial vessels expected as 
spectators into these zones would create an inherently unsafe 
condition. Therefore, even if all security concerns could be 
eliminated, which in and of itself would be a time consuming and 
intrusive task, the safety concerns are too great to allow this type of 
controlled access. The Atlantic Ocean/Wassaw Sound zone is located near 
both the Day Marina, where vessels ferrying Olympic athletes will be 
moored and race venue ``A'', where athletes and numerous vessels will 
be present. In addition, athlete shuttles will regularly transit the 
area. As proposed by the ACOG and as discussed below, the only 
spectator vessels allowed within the zones will be a controlled number 
of vessels carrying passengers with official Olympic tickets to view 
the yachting events (ticketed spectator vessels). Those vessels and the 
passengers on board will undergo extensive security screens prior to 
entry into the zone and their movement within the zone will be strictly 
controlled so as not to create a hazard to navigation.
    The Coast Guard also received one comment from the operator of a 
sea kayak business. The business launches kayaks from the south end of 
Tybee Island and the kayaks then proceed to Myrtle Island. Under the 
proposed Atlantic Ocean/Wassaw Sound zone, Myrtle Island and 
surrounding water would be inaccessible as the area would be 
encompassed within the zone. The commentor was concerned the impact of 
the zone would have on his business and asked that the zone be modified 
so that the zone ended fifty yards offshore off the beach of Myrtle 
Island. In response to this comment, the Atlantic Ocean/Wassaw sound 
zone has been slightly modified from the proposal to allow access to 
the marsh area within 50 yards of Myrtle Island, thereby providing a 
large area suitable for kayaking without compromising safety or 
security. Additionally, due to the modifications to the proposed zones, 
the Atlantic Ocean/Wassaw Sound zone has been renumbered in the final 
rule and now is described in Sec. 165.T07-062(7).

Ticketed Vessels

    The Coast Guard received one comment that suggested the 
``ticketed'' vessels that will operate inside the safety/security zones 
appear to represent a privileged fleet, particularly given the high 
price of tickets. The Coast Guard notes that these vessels, as well as 
their passengers, will be subject to the same security measures that 
spectators attending shoreside events will undergo. These vessels are 
merely mobile ``bleachers'' that will operate within the security 
envelope subject to strict instructions from the ACOG and the Captain 
of the Port. Tickets are being sold to all other Olympic events; the 
yachting events are no different. The cost of these tickets is 
comparable to the price of tickets for other Olympic events. As noted 
above, limiting spectator vessel access is necessary to ensure 
navigational safety and the security of the Olympic athletes and 
associated vessels.

Impacts on Commercial Fishermen

    Several comments from commercial fisherman, commercial crab 
trappers and bait draggers in the area expressed concerns that they 
would be unduly impacted by the regulations due to the combination of 
the limited areas and times authorized for fishing by the safety and 
security zones and the limitations imposed by their state issued 
fishing licenses. Crab trappers commented on the inordinate number of 
buoys lost in the Wilmington River during last summer's regatta and 
were concerned that the high volume of traffic during the Olympics 
would result in the loss of large numbers of traps. A representative 
for commercial fishermen and shrimpers at the public meeting pointed 
out that there are usually 150-200 traps out during any given time and

[[Page 18954]]

that during a regatta last summer each boat lost nearly 50 traps. 
Concern was also expressed by a crab trapper on the effect of delays in 
entering Turner Creek and Wilmington River in combination with the 
summer heat, which could lead to loss of many crabs after harvesting.
    The Coast Guard has reviewed the problems raised by the commercial 
fishermen which will result from the combination of heavy vessel 
traffic and restrictions on access due to the safety/security zones. 
The Coast Guard must balance these concerns against concerns, discussed 
in detail above, for security and navigational safety. In trying to 
strike a balance, the Coast Guard has had discussions with the State of 
Georgia Marine Fisheries Branch of Georgia Department of Natural 
Resources (DNR) which has been made aware of the concerns of the 
fishermen. The DNR is giving consideration to changing the authorized 
locations and/or hours of operation during the period covered by the 
Olympics. These changes would help alleviate some of the problems 
mentioned by commercial fishermen by reducing the overlap in times when 
access to certain areas will be restricted by the safety/security zones 
and access is permitted by state fishing licenses.
    The ACOG has agreed to add a warning to its volunteer training 
program and to boating information given to the participants 
highlighting the need to be respectful of crabbers' traps. The Coast 
Guard also notes, though, that some disturbance of traps is unavoidable 
and that the representative at the public meeting noted that the 
impacts expected on trap loss during the Olympics is about the same as 
that expected on any busy weekend.
    Additionally, the Coast Guard notes that the changes in planned 
operation of the zone in the Turner Creek/Wilmington River area 
(Sec. 165.T07-062(2)) to allow direct transit through the zone, as 
opposed to making vessels wait and escorting those vessels in groups 
through the zone, should reduce the concerns about loss of crabs due to 
prolonged exposure to heat. Vessels will be denied immediate transit 
through this area only in cases of immediate safety or security 
concerns.

Discussion of Regulations

    These regulations are intended to promote secure and safe 
navigation on the waters surrounding the Olympic Village, Olympic 
ceremonies, Olympic Marinas, racing venue areas, and athlete waterborne 
transits, by controlling the traffic entering, exiting and traveling 
within these waters.
    Coast Guard and State Law Enforcement patrol vessels with a Coast 
Guard representative on board will be on scene to enforce the zones and 
direct traffic. No persons or vessels will be allowed to enter or 
operate within the zones while they are in effect, except as may be 
authorized by the Captain of the Port. These regulations are issued 
pursuant to 33 U.S.C. 1231 and 50 U.S.C. 191, as set out in the 
authority citation of all of Part 165.
    The effective dates of the individual safety/security zones vary, 
but overall the zones are in effect from July 6 to August 4, 1996.
    Six fixed and one moving safety/security zone are being established 
in the following areas: (1) Savannah River (Olympic Village area), all 
the waters around the Marriott Hotel-Olympic Village; (2) Wilmington 
River/Turner Creek (Olympic Marina area); (3) Wilmington River/Tybee 
Cut, moving safety/security zones will be placed around all Olympic 
Athlete Shuttle vessels with athletes on board while transiting between 
the Olympic Marina and the Day Marina; (4) Tybee Cut/Half Moon River, 
the western entrance to Tybee Cut and the western and eastern approach 
to Half Moon River (July 6-18); (5) Tybee Cut/Bull River/Half Moon 
River, the western entrance to Tybee Cut, the western approach to Half 
Moon River and southern entrance to the Bull River (July 19-August 2); 
(6) Wassaw Sound, a fixed security zone will be placed around the Day 
Marina; and (7) the Atlantic Ocean and Wassaw Sound offshore racing 
areas, which includes the area from Myrtle Island until the Wilmington 
River and the area from Wilmington Island until the junction of the 
Half Moon and Bull Rivers. The following is a detailed description of 
each zone and its effective times.
    Olympic Village: This zone will be in effect 24 hours a day from 8 
a.m. EDT July 6 to 12 p.m. EDT August 4, 1996 and will affect the 
entire width of the Savannah River for a distance of 1,000 yards 
centered on the Marriott Hotel. Vessels representing the Captain of the 
Port will be available to escort unaffiliated vessels desiring to 
transit the area. Unaffiliated vessels are defined as all vessels that 
are not registered with the ACOG or designated as an Official Vessel by 
the Coast Guard Captain of the Port. Vessels will be asked to transit 
along the Northern side of the channel. During periods of heavy 
recreational traffic, delays should be expected. Priority will be given 
to commercial traffic. On July 20th, July 29th and August 2nd the zone 
will be extended 500 yards to the west from 7:30 p.m. to 10:30 p.m. EDT 
for the opening, medal, and closing ceremonies. No vessels will be 
allowed to transit the zone during these times.
    Olympic Marina: This zone will be in effect 24 hours a day from 8 
a.m. EDT July 6 to 7 p.m. EDT August 2, 1996 and will extend across the 
mouth of Turner Creek, just east of Sail Harbor. The zone will extend 
200 yards west into the Wilmington River from Turner Rock and run south 
to a point due west of the first private dock, and then easterly to the 
shore. Vessels will need permission from a Coast Guard official acting 
for the COTP in the vicinity prior to transiting into or out of Turner 
Creek. Once permission is granted to transit the zone, unaffiliated 
vessels will not be allowed to stop or loiter in the vicinity of Sail 
Harbor or the Sheraton Complex. The COTP anticipates routinely granting 
permission to transit the zone, but should the number of vessels 
seeking to transit this area reach a number that compromises athlete 
security the Coast Guard may escort groups of vessels through the area, 
require one-way transits, or deny access for short time periods. Delays 
should be minimal.
    Wilmington River/Tybee Cut: A 75 yard moving safety/security zone 
will be enforced around Athlete Shuttles from 8 a.m. to 7 p.m. EDT 
daily from July 6 to August 2, 1996 as they transit from the Olympic 
Marina (Sheraton) to the Day Marina at Beach Hammock. Vessel operators 
will need to be alert for the approach of these vessels and stand 
clear. Athlete shuttle vessels will be in continuous operation from 8 
a.m. to 7 p.m. EDT and will proceed down the eastern side of the 
Wilmington River, through Tybee Cut, into Half Moon River and then to 
the Day Marina located in Wassaw Sound. The same route will be used for 
return trips.
    Tybee Cut/Half Moon River: This safety/security zone closes Tybee 
Cut to all unaffiliated vessels from 8 a.m. to 7 p.m. EDT daily from 
July 6 to July 18, 1996. From July 19 through August 2, 1996 the area 
encompassed by this becomes part of the Tybee Cut/Bull River/Half Moon 
River zone. As part of this zone, the entrance to the Half Moon River 
just west of the intersection with Tybee Cut will also be closed. The 
eastern boundary of this zone will be the eastern entrance of the Half 
Moon River on Wassaw Sound. Wassaw Sound, west of Wassaw Breaker will 
be open to vessel traffic during this time. Tybee Cut will be used by 
the Athlete Shuttles and affiliated vessels from 8 a.m. to 1 p.m. EDT 
and from 2 p.m. to 7 p.m. EDT. The Captain of the Port, via Broadcast 
Notice to Mariners, will grant general permission for all vessels to 
transit between the Bull River and Half

[[Page 18955]]

Moon River and between Tybee Cut and Wilmington River. This one hour 
access window may slide to a later time if race delays occur. 
Additionally from 7 p.m. to 8 a.m. EDT daily, unrestricted access to 
Tybee Cut, the Half Moon River and the Bull River will be allowed.
    Tybee Cut/Bull River/Half Moon River: This zone is effective from 
July 19 to August 2. The zone will encompass the entire area of the 
Tybee Cut/Half Moon River zone described above, including closing Tybee 
Cut, but the eastern boundary will shift to be across the Bull River at 
the Northern end of Wassaw Sound. As a result, from July 19 to August 
2, Wassaw Sound will be inaccessible from Bull River from 8 a.m. to 7 
p.m. EDT daily. Tybee Cut will continue to be used by the Athlete 
Shuttles and affiliated vessels from 8 a.m. to 1 p.m. EDT and from 2 
p.m. to 7 p.m. EDT. Unaffiliated vessels will be allowed access to 
Tybee Cut, the Half Moon River, and the Bull River from 1 p.m. to 2 
p.m. EDT daily. However, unaffiliated vessels will not be allowed to 
proceed south of an alternate line described in section 165.T07-
062(a)(5). This one hour access window may slide to a later time if 
race delays occur. Additionally from 7 p.m. to 8 a.m. EDT daily, 
unrestricted access to Tybee Cut, the Half Moon River and the Bull 
River will be allowed.
    Wassaw Sound: A 200 yard safety/security zone will be in effect 24 
hours a day form 8 a.m. EDT July 6 to 7 p.m. EDT August 2, 1996 around 
the Day Marina. No unaffiliated vessels will be allowed access to the 
zone from 8 a.m. to 7 p.m. EDT. Note that beginning July 19 when the 
Tybee Cut/Bull River/Half Moon River and Wassaw Sound/Atlantic Ocean 
safety/security zones are in effect this zone around the Day Marina, is 
fully encompassed by those zones. From 7 p.m. to 8 a.m. EDT all vessels 
will be granted permission to transit this zone between Wassaw Sound 
and the Bull River, under the condition that the vessels may not 
proceed closer than 50 yards to the Day Marina, and must obtain prior 
authorization from Coast Guard Vessels patrolling the zone.
    Wassaw Sound/Atlantic Ocean: The approximately 14 mile long safety/
security zone offshore will be established from July 19 to August 3, 
1996 and will be in effect 24 hours a day. From 8 a.m. to 7 p.m. EDT no 
unaffiliated vessels will be granted permission to enter this zone. 
Vessels desiring to transit the area from 7 p.m. to 8 a.m. EDT will 
need to check in with Coast Guard vessels in the vicinity for 
permission. The Coast Guard expects to grant such permission, provided 
there are no immediate safety or security concerns.
    The regulations for the offshore racing areas included within this 
zone will be enforced for the race venues which are located within the 
navigable waters of the United States. These regulations are necessary 
to minimize navigational dangers and to ensure the safety and security 
of Olympic athletes and affiliated vessels operating within the Olympic 
venue. Nonobligatory guidelines are included in the regulatory language 
for that portion of the racing venue which falls outside the navigable 
waters of the United States. Entry into this safety/security zone by 
other than affiliated vessels will be prohibited without permission of 
the Captain of the Port or the Olympic Patrol Commander.
    Olympic Torch: The Coast Guard is establishing a moving safety zone 
for the vessel which will carry the Olympic torch to the Savannah 
waterfront, prior to the commencement of the 1996 Olympic Games. The 
exact route of the torch is uncertain at this time. The zone will 
commence either, on the Savannah River in the vicinity of Coast Guard 
Station Tybee and continue west up river to the Highway 17A bridge 
(Talmadge bridge), or at the mouth of the Wilmington River and proceed 
to the Savannah River via the ICW and thence westerly to the Highway 
17A bridge. The safety zone is needed for the protection of the vessel 
carrying the Olympic torch. The Captain of the Port will provide escort 
vessels and restrict approaching vessel operations in support of the 
moving safety zone.
    Olympic Fireworks: Finally, the Coast Guard is establishing a 
safety zone for a fireworks display in connection with Olympic 
festivities, on the Savannah River in the vicinity of Rousakis Plaza. 
The safety zone is needed to protect vessels, facilities, and personnel 
from safety hazards associated with the storage, preparation, and 
launching of fireworks. The Captain of the Port is restricting vessel 
operations in the safety zone.

Regulatory Evaluation

    These regulations are not a significant regulatory action under 
section 3(f) of Executive Order 12866 and do not require an assessment 
of potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation under paragraph 
10e of the regulatory policies and procedures of DOT is unnecessary. As 
discussed in the preamble, the boundaries, effective dates and times of 
all of the safety/security zones in this rule have been carefully 
tailored to meet the needs of security for the Olympic athletes while 
still providing for navigational safety. The 1,000 to 2,000 extra 
vessels expected to be in the Savannah area for the Olympics will bring 
a large amount of extra business into the area for many of the 
businesses affected by this rule.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard considered whether this rule will have a significant effect 
on a substantial number of small entities. ``Small entities'' may 
include (1) small businesses and not for profit organizations that are 
independently owned and operated and are not dominant in their fields 
and (2) governmental jurisdictions with populations of less than 
50,000.
    Over 1,100 athletes and coaches representing over 80 countries, 
over 300 competition vessels, as well as approximately 1,000 to 2,000 
support and spectator vessels are expected to arrive and participate in 
the festivities of the 1996 Olympic yachting competition. To ensure the 
security of the Olympic athletes and support personnel and to ensure 
the safety of the large volume of recreational and spectator vessels 
expected in the area, the Coast Guard is establishing these safety/
security zones. The Coast Guard realizes that this rule will have some 
effect on some small entities, but the rule has been narrowly tailored 
to provide for security of the athletes and navigational safety on the 
waterways. The effective dates and times as well as the boundaries of 
the zones have been examined to ensure that they restrict movement only 
to the extent necessary to ensure security and navigational safety. 
Many of the zones are only in effect from 8 a.m. to 7 p.m. EDT when 
athletes are most likely to be in the areas, providing unlimited access 
to many areas each evening. As discussed in the preamble, alternate 
routes to those routes affected by this rule exist for many of the 
zones. If a vessel needs to transit through a zone, the COTP may grant 
permission for vessel transit even when the zone is in effect. To help 
vessels plan transits, the Coast Guard has provided details in this 
rule as to times and places when the COTP anticipates granting such 
permission and how vessels may request such

[[Page 18956]]

permission. As discussed in the preamble, the Olympic yachting events 
will bring large numbers of people and vessels into the area. Although 
the effect of this rule on small business is difficult to quantify, the 
Coast Guard expects that losses incurred by small entities as a result 
of this rule may be offset by a large increase in potential customers, 
albeit temporary.
    For the reasons discussed above, including the determination that 
this rule is not economically significant, the Coast Guard certifies 
under section 605(b) of the Regulatory Flexibility Act (5 U.S.C. et 
seq.) that this rule will not have a significant economic impact on a 
substantial number of small entities.

Collection of Information

    This rule contains no collection-of-information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that the rule does not have sufficient federalism implications to 
warrant the preparation of a Federalism Assessment.

Environmental Assessment

    The Coast Guard has considered the environmental impact of this 
rule consistent with Section 2.B.2. of Commandant Instruction 
M16475.1B. In accordance with that section, this action has been 
environmentally assessed (EA completed), and the Coast Guard has 
concluded that it will not significantly affect the quality of the 
human environment. An environmental assessment and finding of no 
significant impact has been prepared and is available for copying and 
inspection where indicated under the ADDRESSES section above.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

Final Regulations

    In consideration of the foregoing, Part 165 of Title 33, Code of 
Federal Regulations, the Coast Guard amends as follows:

PART 165--[AMENDED]

    1. The authority citation for Part 165 continues to read as 
follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1(g), 
6.04-1, 6.04-6, and 160.5; 49 CFR 1.46.

    2. A new Sec. 165.T07-062 is added to read as follows:

Sec. 165.T07-062  Safety/Security Zones: Savannah River, Wilmington 
River and Turner Creek, Bull River and Wassaw Sound, GA.

    (a) Safety/Security zones. The following areas are safety/security 
zones (all coordinates referenced use Datum: NAD 1983):
    (1) Marriott Hotel/Olympic Village. The safety/security zone is in 
the following area: from the Marriott Hotel Olympic Village on the 
Savannah River in position:
    32 deg. 04' 48'' N, 81 deg. 04' 54'' W; thence east to
    32 deg. 04' 45'' N, 81 deg. 04' 44'' W; thence west to
    32 deg. 04' 49'' N, 81 deg. 05' 05'' W.
    This zone includes all waters within the above noted area in the 
Savannah River from shore to shore. This zone is extended an additional 
500 yards to the west for opening (July 20, 1996) and closing 
ceremonies (August 2, 1996) as well as the award ceremonies (July 29, 
1996).
    (2) Olympic Marina; Wilmington River and Turner Creek. The safety/
security zone is in the following area for the Olympic Village: On the 
Wilmington River Commencing at position:
    32 deg. 00' 41'' N, 81 deg. 00' 16'' W; thence west 200 yards to
    32 deg. 00' 34'' N, 81 deg. 00' 22'' W; then southerly to
    32 deg. 00' 13'' N, 81 deg. 00' 12'' W; then east to the shore of 
Wilmington Island. Shoreside to the entrance of Turner Creek.
    The eastern boundary of this zone is established in the following 
position:
    32 deg. 00' 32'' N, 80 deg. 59' 55'' W; thence north to
    32 deg. 00' 37'' N, 80 deg. 59' 53'' W.
    (3) Wilmington River and Tybee Cut. A moving safety/security zone 
is in the following areas:
    All waters within a 75 yard radius around all Olympic athlete 
shuttle vessels with Olympic athletes and officials onboard. These 
vessels will be transiting the Wilmington River in the area between the 
Olympic Marina at position:
    32 deg. 00' 34'' N, 80 deg. 59' 55'' W; thence southeast via the 
Wilmington River and Tybee Cut to,
    31 deg. 56' 40'' N, 80 deg. 55' 46'' W; the Olympic Day Marina.
    (4) Tybee Cut/Half Moon River. This safety/security zone closes 
Tybee Cut and the eastern approach to the Half Moon River to all 
unaffiliated vessels, at the following positions:
    (i) Tybee Cut from shore to shore across the entrance at position:
    31 deg. 57' 06'' N, 80 deg. 59' 09'' W.
    (ii) Half Moon River (west) extending from shore to shore from 
position:
    31 deg. 58' 15'' N, 80 deg. 57' 46'' W; northeast to
    31 deg. 58' 16'' N, 80 deg. 57' 36'' W.
    (iii) Half Moon River (east) extending from shore to shore from 
position:
    31 deg. 57' 42'' N, 80 deg. 57' 05'' W; thence northerly to
    31 deg. 57' 53'' N, 80 deg. 57' 00'' W.
    This zone includes all of Tybee Cut.
    (5) Tybee Cut/Bull River/Half Moon River. This safety/security zone 
closes Tybee Cut, the southern entrance to the Bull River, and the 
eastern approach to the Half Moon River to all unaffiliated vessels, at 
the following positions:
    (i) Tybee Cut from shore to shore across the entrance at position:
    31 deg. 57' 06'' N, 80 deg. 59' 09'' W.
    (ii) Half Moon River extending from shore to shore from position:
    31 deg. 58' 15'' N, 80 deg. 57' 46'' W; northeast to
    31 deg. 58' 16'' N, 80 deg. 57' 36'' W.
    (iii) Primary Bull River the southern most tip of Wilmington Island 
at position:
    31 deg. 57' 50'' N, 80 deg. 56' 55'' W; east to Little Tybee Island
    31 deg. 57' 35'' N, 80 deg. 55' 55'' W.
    Alternate Bull River from the northeastern most point of Cabbage 
Island at position:
    31 deg. 57' 35'' N, 80 deg. 56' 55'' W; east to Little Tybee Island
    31 deg. 57' 35'' N, 80 deg. 55' 55'' W.
    This zone includes all of Tybee Cut and establishes the 
northwestern boundary of the Atlantic safety/security zone described in 
paragraph (a)(6).
    (6) Day Marina/Wassaw Sound. This safety/security zone extends in a 
radius of 200 yards around the Olympic Day Marina located in 
approximate position 32 deg. 56' 40'' N, 81 deg. 55' 52'' W.
    (7) Atlantic Ocean and Wassaw Sound. The following areas are a 
safety/security zone:
    (i) from a position in Wassaw Sound at:
    31 deg. 57' 32'' N, 80 deg. 56' 31'' W; thence east to Little Tybee 
Island, at 31 deg. 57' 30'' N, 80 deg. 51' 45'' W following the 
southern shoreline of Little Tybee Island to 31 deg. 58' 16'' N, 
80 deg. 51' 45'' W thence southeast.
    31 deg. 58' 00'' N, 80 deg. 50' 48'' W; thence southeast
    31 deg. 57 ' 45'' N, 80 deg. 50' 08'' W; thence southeast
    31 deg. 57' 27'' N, 80 deg. 49' 21'' W; thence south
    31 deg. 56' 21'' N, 80 deg. 48' 48'' W; thence southwest to
    31 deg. 55' 34'' N, 80 deg. 49' 11'' W; thence southwest to
    31 deg. 54' 45'' N, 80 deg. 49' 34'' W; thence

[[Page 18957]]

southwest to
    31 deg. 53' 58'' N, 80 deg. 49' 55'' W; thence southwest to
    31 deg. 53' 09'' N, 80 deg. 50' 19'' W; thence west to
    31 deg. 52' 45'' N, 80 deg. 52' 00'' W; thence northwest to
    31 deg. 53' 06'' N, 80 deg. 52' 30'' W; thence northwest to
    31 deg. 53' 36'' N, 80 deg. 53' 15'' W; thence northwest to
    31 deg. 54' 32'' N, 80 deg. 54' 27'' W; thence northwest to
    31 deg. 54' 48'' N, 80 deg. 54' 55'' W; thence west to
    31 deg. 55' 02'' N, 80 deg. 56' 20'' W; thence to a curved line 
following the outer edge of Race Course Circle A northwest to 31 deg. 
56' 11'' N, 80 deg. 58' 14'' W; east northeast to Cabbage Patch Island 
at position 31 deg. 56' 18'' N, 80 deg. 58' 04'' W following the 
southern shoreline of Cabbage Patch Island to 31 deg. 57' 30'' N, 
80 deg. 56' 57'' W thence east to 31 deg. 57' 32'' N, 80 deg. 56' 31'' 
W. (ii) In Wassaw Sound from the southern tip of Wilmington Island at 
the junction of the Half Moon and Bull Rivers at position:
    31 deg. 57' 47'' N, 80 deg. 56' 25'' W; thence southeast to
    31 deg. 57' 33'' N, 80 deg. 55' 55'' W; thence south including all 
the waters of Wassaw Sound.
    (b) Definitions.
    (1) Unaffiliated vessels. All vessels that are not registered with 
the Atlanta Committee on the Olympic Games (ACOG) or designated as an 
Official Vessel by the Coast Guard Captain of the Port are unaffiliated 
vessels.
    (2) The ACOG vessels. All vessels that are registered with the 
ACOG.
    (3) Olympic athlete shuttle vessels. The ACOG vessels ferrying 
Olympic athletes between the Olympic Marina and the Day Marina.
    (4) Participant. Any competition vessel or vessel directly 
supporting competition that is registered with the ACOG while in 
performance of its official function relative to a given race.
    (5) Competition Vessels. Any vessel approved and designated by the 
ACOG for participation in sanctioned racing.
    (6) Official Vessels. Official Vessels are all U.S. Coast Guard, 
U.S. Coast Guard Auxiliary, state and local law enforcement, and 
civilian vessels designated by the Coast Guard Captain of the Port.
    (7) Captain of the Port. A Captain of the Port has been designated 
by the Commander, Seventh Coast Guard District. The Captain of the Port 
has the authority to control the movement of all vessels operating in 
the regulated areas and may suspend the races at any time it is deemed 
necessary for the protection of life and property.

    Note: The Captain of the Port may be contacted during the 
regulatory periods on VHF/FM Channel 16 (156.8 MHZ) or Channel 22 
(157.1 MHZ) by calling ``Coast Guard Captain of the Port'' or 
``Coast Guard Marine Safety Office Savannah''.

    (8) Coast Guard Vessels. Any Coast Guard vessel or other vessel 
with a Coast Guard representative onboard.
    (c) Effective dates.
    (1) Marriott Hotel/Olympic Village. The safety/security zone is 
effective from 8 a.m. EDT July 6, 1996, and terminates at 12 p.m. EDT 
August 4, 1996. From 7:30 p.m. until 10:30 p.m. EDT on July 20, July 
29, and August 2, 1996 the zone is extended 500 yards west for the 
opening, medals, and closing ceremonies.
    (2) Olympic Marina; Wilmington River and Turner Creek. This safety/
security zone is effective from 8 a.m. EDT July 6, 1996, and terminates 
at 7 p.m. EDT August 2, 1996.
    (3) Wilmington River/Tybee Cut. This moving safety/security zone is 
effective from 8 a.m. to 7 p.m. EDT daily from July 6, 1996 until 
August 2, 1996.
    (4) Tybee Cut/Half Moon River. This safety/security zone is 
effective between 8 a.m. and 7 p.m. EDT daily from July 6, 1996 until 
July 18, 1996. The Captain of the Port may authorize access to Tybee 
Cut and Half Moon River between approximately 1 p.m. and 2 p.m. EDT 
daily.
    (5) Tybee Cut/Bull River/High Moon River. This safety/security zone 
is effective between 8 a.m. and 7 p.m. EDT daily from July 19, 1996 
until August 2, 1996. The alternate Bull River position granting access 
to Tybee Cut and Half Moon River is effective between approximately 1 
p.m. and 2 p.m. EDT daily, unless otherwise published by the Captain of 
the Port in the Local Notice to Mariners.
    (6) Day Marina/Wassaw Sound. This safety/security zone is effective 
from 8 a.m. EDT July 6, 1996 to 7 p.m. EDT August 2, 1996.
    (7) Atlantic Ocean and Wassaw Sound. This safety/security zone is 
effective between the hours of 10 a.m. and 7 p.m. EDT daily, commencing 
July 19, 1996 to August 2, 1996 on each race date.
    The Captain of the Port may elect not to implement the regulations 
on those race dates when the races are postponed or canceled; 
announcement to that effect will be made by Broadcast Notice to 
Mariners.
    (d) Regulations.
    (1) In accordance with the general regulations in Sec. 165.23 and 
Sec. 165.33 of this part, entry into the zones established by this 
regulation is prohibited unless authorized by the Captain of the Port 
or a Coast Guard commissioned, warrant, or petty officer designated by 
him. Section 165.33 also contains other general requirements.
    (2) For the Atlantic Ocean/Wassaw Sound security/safety zone, 
described in (a)(7), on those waters within the Olympic offshore race 
venue which fall within the navigable waters of the United States, 
i.e., those waters within three nautical miles of the baseline from 
which the territorial sea is measured, the following regulations apply:
    (i) Unaffiliated vessels shall remain outside the course perimeter, 
as marked by the ACOG vessels and Official Vessels.
    (ii) All vessels shall follow the instructions of any Coast Guard, 
Coast Guard Auxiliary or state law enforcement vessels.

    Note: The regulations specified in paragraph (d)(2) apply only 
within the navigable waters of the United States. In all waters 
within the Olympic offshore race venue which fall outside the 
navigable waters of the United States, during the specified dates 
and times, the following nonobligatory guidelines apply:

    (A) All unaffiliated vessels should remain clear of the race venue 
and avoid interfering with any participant, the ACOG or Official 
Vessel. Interference with race activities may constitute a safety 
hazard warranting cancellation or termination of all or part of the 
race activities by the Captain of the Port.
    (B) Any unauthorized entry within the race course perimeter, as 
marked by the ACOG and Official Vessels, by unaffiliated vessels 
constitutes a risk to the safety of marine traffic. Such entry will 
constitute a factor to be considered in determining whether a person 
has operated a vessel in a negligent manner in violation of 46 U.S.C. 
2302.
    3. A new temporary Sec. 165.T07-077 is added to read as follows:

Sec. 165.T07-077  Safety Zone: Savannah River, Savannah, GA.

    (a) Location. The following area is a moving safety zone: All 
waters within a 75 yard radius around the vessel that carries the 
Olympic torch to the Savannah waterfront. The exact route of the vessel 
carrying the torch will be announced via Broadcast Notice to Mariners 
before the zone is in effect. The zone commences either, on the 
Savannah River in the vicinity of Coast Guard Station Tybee 
(approximate position of 32 deg. 02' 10'' N, 80 deg. 54' 16'' W) and 
continue west up river to the Highway 17A bridge (Talmadge bridge) 
(approximate position 32 deg. 05' 13'' N, 81 deg.

[[Page 18958]]

05' 47'' W), or at the mouth of the Wilmington River and proceed to the 
Savannah River via the Intracoastal Waterway (ICW) and thence westerly 
to the Highway 17A bridge. All coordinates referenced use Datum: NAD 
1983.
    (b) Effective date. This section is effective at 6 p.m. and expires 
at 10 p.m. EDT on July 9, 1996, unless terminated sooner by the Captain 
of the Port, Savannah, GA.
    (c) Regulations. In accordance with the general regulations in 
Section 165.23 of this part, entry into the zone is subject to the 
following requirements:
    (1) This safety zone is closed to all marine traffic, except as may 
be permitted by the Captain of the Port or his representative.
    (2) The ``representative of the Captain of the Port'' is any Coast 
Guard commissioned, warrant or petty officer who has been designated by 
the Captain of the Port, Savannah, GA, to act on his behalf regardless 
of the support platform.
    (3) Vessel operators desiring to enter or operate within the safety 
zone shall contact the Captain of the Port or his representative to 
obtain permission to do so. Vessel operators given permission to enter 
or operate in the safety zone shall comply with all directions given 
them by the Captain of the Port or his Representative.
    (4) The Captain of the Port may be contacted by telephone via the 
Command Duty Officer at (912) 652-4353. Vessels assisting in the 
enforcement of the safety zone may be contacted on VHF-FM channels 16 
or 81, or vessel operators may determine the restrictions in effect for 
the safety zone by coming alongside a vessel patrolling the perimeter 
of the safety zone.
    (5) The Captain of the Port will issue a Marine Safety Information 
Broadcast Notice to Mariners to notify the maritime community of the 
safety zone and restrictions imposed. Coast Guard vessels enforcing the 
zones will have informational handouts. Information will also be 
available at local marinas.
    4. A new temporary Sec. 165.T07-078 is added to read as follows:

Sec. 165.T07-078  Safety Zone: Savannah River, Savannah, GA.

    (a) Location. The following area is a safety zone: All waters 
within a 50 yards radius around a fireworks barge in the vicinity of 
Rousakis Plaza, Savannah River, Savannah, GA at an approximate position 
of 32 deg.04'.55 N, 81 deg.05'.27 W. All coordinates referenced use 
Datum: NAD 1983. The Savannah River will be closed to all vessel 
transits, during the actual fireworks display.
    (b) Effective date. This section is effective at 9:15 p.m. and 
expires at 11 p.m. EDT on July 4, 1996, unless terminated sooner by the 
Captain of the Port, Savannah, GA.
    (c) Regulations. In accordance with the general regulations in 
Section 165.23 of this part, entry into the zone is subject to the 
following requirements:
    (1) This safety zone is closed to all marine traffic, except as may 
be permitted by the Captain of the Port or his representative.
    (2) The ``representative of the Captain of the Port'' is any Coast 
Guard commissioned, warrant or petty officer who has been designated by 
the Captain of the Port, Savannah, GA, to act on his behalf regardless 
of the support platform.
    (3) Vessel operators desiring to enter or operate within the safety 
zone shall contact the Captain of the Port or his representative to 
obtain permission to do so. Vessel operators given permission to enter 
or operate in the safety zone shall comply with all directions given 
them by the Captain of the Port or his representative.
    (4) The Captain of the Port may be contacted by telephone via the 
Command Duty Officer at (912) 652-4353. Vessels assisting in the 
enforcement of the safety zone may be contacted on VHF-FM channels 16 
or 81, or vessel operators may determine the restrictions in effect for 
the safety zone by coming alongside a vessel patrolling the perimeter 
of the safety zone.
    (5) The Captain of the Port will issue a Marine Safety Information 
Broadcast Notice to Mariners to notify the maritime community of the 
safety zone and restrictions imposed. Coast Guard vessels enforcing the 
zones will have informational handouts. Information will also be 
available at local marinas.

    Dated: April 23, 1996.
Roger T. Rufe, Jr.,
Rear Admiral, U.S. Coast Guard, Commander, Seventh Coast Guard 
District.
[FR Doc. 96-10556 Filed 4-29-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-10542 Defense Federal Acquisition Regulation Supplement; Pricing for Sales of Defense Articles
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18987-18988]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10542]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

48 CFR Part 225

[DFARS Case 96-D309]

Defense Federal Acquisition Regulation Supplement; Pricing for 
Sales of Defense Articles

AGENCY: Department of Defense (DoD).

ACTION: Interim rule with request for comment.

-----------------------------------------------------------------------

SUMMARY: The Director of Defense Procurement is amending the Defense 
Federal Acquisition Regulation Supplement (DFARS) to implement 
statutory provisions which require that foreign military sales wholly 
paid for from funds made available on a nonrepayable basis shall be 
priced on the same costing basis as is applicable to acquisitions of 
like items purchased by DoD for its own use.

DATES: Effective date: April 30, 1996.
    Comment date: Comments on the interim rule should be submitted in 
writing to the address shown below on or before July 1, 1996, to be 
considered in the formulation of the final rule.

ADDRESSES: Interested parties should submit written comments to: 
Defense Acquisition Regulations Council, Attn: Ms. Amy Williams, PDUSD 
(A&T) DP (DAR), IMD 3D139, 3062 Defense Pentagon, Washington, DC 20301-
3062. Telefax (703) 602-0350. Please cite DFARS Case 96-D309 in all 
correspondence related to this issue.

FOR FURTHER INFORMATION CONTACT:
Ms. Amy Williams, (703) 602-0131.

SUPPLEMENTARY INFORMATION:

A. Background

    This interim rule amends DFARS Subpart 225.73 to implement Section 
531A of the Fiscal Year 1996 Foreign Operations, Export Financing, and 
Related Programs Appropriations Act (Pub. L. 104-107), which amends 
Section 22 of the Arms Export Control Act (22 U.S.C. 2762) to require 
that foreign military sales of defense articles and defense services 
wholly paid for from funds made available on a nonrepayable basis shall 
be priced on the same costing basis as is applicable to like items 
purchased by DoD for its own use.

B. Regulatory Flexibility Act

    This rule is not expected to have a significant economic impact on 
a substantial number of small entities within the meaning of the 
Regulatory Flexibility Act, 5 U.S.C. 601 et seq., because DFARS Subpart 
225.73 already requires pricing of foreign military sales contracts 
using the same general principles as are used in pricing other defense 
contracts. The only significant change in this rule relates to the 
allowability of independent research and development and bid and 
proposal costs in accordance with the cost principle at FAR 31.205-18. 
This change is not expected to significantly impact small entities, as 
most contracts awarded to small entities are awarded on a competitive, 
fixed-price basis and do not require application of the FAR cost 
principles. An initial regulatory flexibility analysis has therefore 
not been performed. Comments are invited from small businesses and 
other interested parties. Comments from small entities concerning the 
affected DFARS subpart will be considered in accordance with 5 U.S.C. 
610. Such comments must be submitted separately and cite DFARS Case 96-
D309 in correspondence.

C. Paperwork Reduction Act

    This rule does not impose any new information collection 
requirements which require the approval of the Office of Management and 
Budget under 44 U.S.C. 3501, et seq.

D. Determination to Issue an Interim Rule

    A determination has been made under the authority of the Secretary 
of Defense that compelling reasons exist to promulgate this interim 
rule without prior opportunity for public comment. This action is 
necessary to implement Section 531A of the Fiscal Year 1996 Foreign 
Operations, Export Financing, and Related Programs Appropriations Act 
(Pub. L. 104-107), which became effective on April 12, 1996. Comments 
received in response to the publication of this interim rule will be 
considered in formulating the final rule.

List of Subjects in 48 CFR Part 225

    Government procurement.
Michele P. Peterson,
Executive Editor, Defense Acquisition Regulations Council.

    Therefore, 48 CFR Part 225 is amended as follows:

PART 225--FOREIGN ACQUISITION

    1. The authority citation for 48 CFR Part 225 continues to read as 
follows:

    Authority: 41 U.S.C. 421 and 48 CFR Chapter 1.
    2. Section 225.7303 is amended by revising the title to read as 
follows:

225.7303  Pricing acquisitions for foreign military sales (FMS).

    3. Section 225.7303-2 is amended by revising the introductory text 
of paragraphs (a) and (c) to read as follows:

225.7303-2  Cost of doing business with a foreign government or an 
international organization.

    (a) In pricing FMS contracts where non-U.S. Government prices as 
described in 225.7303-1 do not exist, except as provided in 225.7303-5, 
recognize the reasonable and allocable costs of doing business with a 
foreign government or international organization, even though such 
costs might not be recognized in the same amounts in pricing other 
defense contracts. Examples of such costs include, but are not limited 
to--
* * * * *
    (c) The provisions of 10 U.S.C. 2372 do not apply to contracts for 
foreign military sales. Therefore, the cost limitations on independent 
research and development and bid and proposal (IR&D/B&P) costs in FAR 
31.205-18 do not apply to such contracts, except as provided in 
225.7303-5. The allowability of IR&D/B&P costs on contracts for foreign 
military sales not wholly paid for from funds made available on a 
nonrepayable basis shall

[[Page 18988]]

be limited to the contract's allocable share of the contractor's total 
IR&D/B&P expenditures. In pricing contracts for such foreign military 
sales--
* * * * *
    4. Section 225.7303-5 is added to read as follows:

225.7303-5  Aquisitions wholly paid for from nonrepayable funds.

    (a) In accordance with 22 U.S.C. 2762(d), foreign military sales 
wholly paid for from funds made available on a nonrepayable basis shall 
be priced on the same costing basis with regard to profit, overhead, 
IR&D/B&P, and other costing elements, as is applicable to acquisitions 
of like items purchased by DoD for its own use.
    (b) Direct costs associated with meeting a foreign customer's 
additional or unique requirements will be allowable under such 
contracts. Indirect burden rates applicable to such direct costs shall 
be permitted at the same rates applicable to acquisitions of like items 
purchased by DoD for its own use.
    (c) A U.S. defense contractor may not recover costs incurred to 
implement its offset agreement with a foreign government or 
international organization if the organization if the foreign military 
sale Letter of Offer and Acceptance is financed with funds made 
available on a nonrepayable basis.

[FR Doc. 96-10542 Filed 4-29-96; 8:45 am]
BILLING CODE 5000-04-M

Complete official Federal Register PDF

FR Doc. 96-10498 Automatic Vehicle Monitoring
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18981-18987]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10498]

-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION
47 CFR Part 90

[PR Docket No. 93-61, FCC 96-115]

Automatic Vehicle Monitoring

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This Order on Reconsideration resolves issues raised by 
petitions for reconsideration of the Commission's Report and Order in 
PR Docket No. 93-61, which established rules governing the licensing of 
the Location and Monitoring Service (LMS) in the 902-928 MHz band. 
Specifically, the Order on Reconsideration resolves issues regarding 
existing LMS licensees that are being afforded grandfathered status. 
These issues involve interference testing, accommodation of secondary 
uses in the 902-928 MHz band, emission masks, frequency tolerance, type 
acceptance and site relocation, as well as extension of the 
construction deadline for grandfathered licensees to September 1, 1996. 
The actions taken in the Order on Reconsideration are needed to provide 
such grandfathered licensees with certainty as they construct their 
systems.

EFFECTIVE DATES: This final rule is effective May 30, 1996, except that 
Secs. 90.203(b)(7) and 90.363(d) became effective March 18, 1996.

FOR FURTHER INFORMATION CONTACT: Jane Hinckley Halprin, Wireless 
Telecommunications Bureau, Commercial Wireless Division, (202) 418-
0620.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Commission's Order 
on Reconsideration in PR Docket No. 93-61, adopted March 18, 1996, and 
released March 21, 1996. The complete text of this Order on 
Reconsideration is available for inspection and copying during normal 
business hours in the FCC Dockets Branch (Room 230), 1919 M Street, 
N.W., Washington, D.C., and also may be purchased from the Commission's 
copy contractor, ITS, Inc., 2100 M Street, N.W., Suite 140, Washington, 
D.C., (202) 857-3800.

Synopsis of Order on Reconsideration

I. Introduction and Background

    1. LMS encompasses both the Automatic Vehicle Monitoring (AVM) 
service established in 1974 and future advanced transportation-related 
services. Existing AVM systems were authorized in the 903-912 and 918-
927 MHz bands, as well as in several bands below 512 MHz. Existing LMS 
systems in these bands generally fall into one of two broad 
technological categories: multilateration systems and non-
multilateration systems. Multilateration systems use spread-spectrum 
technology to locate vehicles (and other moving objects) with great 
accuracy throughout a wide geographic area. Non-multilateration systems 
typically use narrowband technology to transmit data to and from 
vehicles passing through a particular location.
    2. LMS systems, both multilateration and non-multilateration, and 
Part 15 devices will play an important role in providing many valuable 
services to the public in the future. In Report and Order, PR Docket 
No. 93-61, 10 FCC Rcd 4695 (1995), 60 FR 15248 (March 23, 1995) (LMS 
Report and Order), the Commission developed a spectrum plan that is 
designed to accommodate these service providers' requirements to the 
extent possible. Aspects of the spectrum plan include: (1) continuing 
to permit secondary operations by unlicensed Part 15 devices across the 
entire band; (2) providing a ``safe harbor'' in which Part 15 devices 
may operate, along with a testing requirement to determine questions of 
interference from multilateration systems; (3) authorizing additional 
spectrum in the 902-928 MHz band in order to enable non-multilateration 
LMS systems to operate on spectrum separate from multilateration 
systems; and (4) permitting only one new multilateration provider in 
each sub-band of spectrum allocated for multilateration operations.
    3. In the LMS Report and Order, the Commission decided to stop 
accepting applications for the operation of multilateration LMS systems 
in the 904-912 and 918-926 MHz bands under our current rules as of 
February 3, 1995. In addition, the Commission adopted certain 
grandfathering provisions that allowed existing, operating 
multilateration LMS systems until April 1, 1998, to complete the 
transition to the rules adopted in the LMS Report and Order. These 
grandfathering provisions were adopted to prevent any undue hardship on 
existing, operating multilateration LMS systems. The Commission also 
conferred grandfathered status on multilateration LMS licensees who had 
not constructed their systems so that such licensees may construct and 
operate their licensed stations under the rules adopted in the LMS 
Report and Order. The Commission concluded, however, that such systems 
must be constructed and

[[Page 18982]]

operational by April 1, 1996, and must comply with the rules adopted in 
the LMS Report and Order by that date. The LMS Report and Order 
directed existing licensees to file applications to modify their 
licenses to reflect operations consistent with the new band plan for 
multilateration systems.
    4. In addition to adopting a new spectrum plan and grandfathering 
provisions, the Commission resolved other technical issues in the LMS 
Report and Order. The Commission established conditions under which 
Part 15 operations would not be considered to cause interference to 
multilateration licensees. It allowed multilateration licensees to 
commence operations only after demonstrating efforts to minimize 
interference with Part 15 operations.
    5. In the Order on Reconsideration, the Commission clarifies its 
decision in the LMS Report and Order regarding the treatment of 
grandfathered LMS systems with respect to Part 15 interference testing. 
In addition, it clarifies that the rule regarding non-interference by 
Part 15 devices set out in Sec. 90.361 applies to grandfathered LMS 
licensees that did not construct as of February 3, 1995, as well as 
future LMS licensees. It also considers modification of various 
technical rules, including emission mask specification, frequency 
tolerance, and site relocation, and we clarify our rules regarding type 
acceptance of LMS equipment. Any remaining issues raised in the 
petitions for reconsideration will be addressed in a later Memorandum 
Opinion and Order.
    6. The Order on Reconsideration also extends the build-out deadline 
for grandfathered LMS licensees by five months, to September 1, 1996. 
It also notes that because the 902-928 MHz frequency band is shared 
with federal government users, LMS operators are required to coordinate 
with the Interdepartmental Radio Advisory Committee (IRAC) concerning 
any proposed modifications to their systems. The Commission expresses 
concern that if existing licensees must await the completion of such 
frequency coordination process before commencing modifications to their 
systems, licensees may not have sufficient time to complete their 
system modifications by the build-out deadline. As a result, the 
Commission concludes that these licensees should be permitted to begin 
modifications to their systems provided they have initiated the 
frequency coordination process with IRAC and on the condition that the 
Commission's final approval of such modifications will be contingent 
upon the successful completion of such frequency coordination.
    7. In addition, On May 22, 1995, Southwestern Bell Mobile Systems 
(SBMS) filed a request for waiver of Section 90.363 of the Commission's 
Rules to grandfather SBMS applications that were pending as of the date 
the LMS Report and Order was adopted. The Commission concludes that 
pending LMS applications should not be eligible for grandfathering. The 
Commission notes that its stated purpose in adopting grandfathering 
provisions was ``[t]o ensure that our new licensing scheme does not 
impose undue hardship on existing, operating multilateration [LMS] 
systems,'' and to allow already-licensed systems the opportunity to 
construct and operate pursuant to the LMS rules adopted in the LMS 
Report and Order. LMS Report and Order, 10 FCC Rcd at 4728. The 
Commission concludes that if some licensees are warehousing spectrum, 
as alleged by SBMS, then they will likely not construct in the time 
allotted so as to attain grandfathered status. That spectrum will then 
be available for competitive bidding by all prospective licensees, 
including SBMS if they so choose.
    8. Further, the Commission notes the argument of SBMS that in the 
SMR context, the Commission adopted a grandfathering provision awarding 
certain secondary sites in the 900 MHz SMR service primary status so as 
to entitle them to full interference protection and decided to 
grandfather pending applications for these secondary sites, concluding 
that this would promote service to the public, that the additional 
amount of protected spectrum would be de minimis and that such action 
would be equitable in light of processing delays. The Commission 
distinguishes the SMR situation from the case of pending LMS 
applications in that the 900 MHz SMR secondary sites were extensions of 
primary sites that were already licensed and constructed, while the LMS 
facilities at issue are unbuilt. Thus, it is questionable how service 
to the public would be facilitated by extending grandfathered status to 
sites that have not even been licensed, much less constructed. 
Moreover, grant of the pending applications could materially alter the 
LMS landscape by adding a number of additional sites and would thus not 
be a de minimis change. Accordingly, the Commission declines SBMS's 
request and clarifies that LMS applications filed prior to February 3, 
1995, will not be eligible for grandfathering. SBMS also asks for an 
extension of the construction deadline for its pending applications. 
Because the Commission is not affording SBMS grandfathered status with 
respect to these applications, this issue is moot. In addition, SBMS 
seeks a waiver to permit relocation of grandfathered sites by more than 
two kilometers and to add sites within a 75-mile radius. This same 
suggestion was made by petitioners for reconsideration and, for the 
reasons discussed infra, the Commission denies SBMS's request.

II. Discussion

A. Multilateration System Operations (Part 15 Testing)

    9. In the LMS Report and Order, the Commission adopted a spectrum 
band plan and established technical criteria for the operators of the 
various systems designed to minimize the potential for interference and 
provide a more conducive environment for sharing of the band by 
disparate services. In an effort to ensure that the coexistence of the 
various services in the band would be as successful as possible, the 
Commission decided to condition the grant of each MTA multilateration 
license on the licensee's ability to demonstrate through actual field 
tests that their systems do not cause unacceptable levels of 
interference to Part 15 devices.
    10. On reconsideration, Part 15 users requested that grandfathered 
multilateration LMS systems be required to demonstrate through testing 
that their systems will not cause unacceptable interference to Part 15 
devices. Further, some Part 15 petitioners suggested that the 
Commission establish uniform guidelines for the testing of LMS systems 
and the demonstration of non-interference to Part 15 devices. Some LMS 
providers, on the other hand, argues that testing of LMS systems is not 
necessary. Further, some parties contended that the testing requirement 
violated the Administrative Procedure Act (APA) because testing 
procedures were not contemplated in the Notice of Proposed Rule Making 
in this proceeding, Notice of Proposed Rule Making, PR Docket No. 93-
61, 8 FCC Rcd 2502 (1993), 58 FR 21276 (April 20, 1993), and/or because 
testing requirements materially alter the Part 15 rules, which was not 
previously proposed.
    11. In the Order on Reconsideration, the Commission clarifies that 
as a condition of grandfathering, it will require all multilateration 
LMS operators who did not construct stations prior to February 3, 1995, 
to demonstrate through testing that their LMS systems will not cause 
unacceptable interference to Part 15

[[Page 18983]]

devices. The Commission reiterates that multilateration licensees may 
employ any one of a number of technical refinements, i.e., limiting 
duty cycle, pulse duration power, etc., to facilitate band sharing and 
minimize interference to Part 15 operations. Further, the Commission 
seeks to ensure not only that Part 15 operators refrain from causing 
harmful interference to LMS systems, but also that LMS systems are not 
operated in such a manner as to degrade, obstruct or interrupt Part 15 
devices to such an extent that Part 15 operations will be negatively 
affected.
    12. The Order on Reconsideration declines to establish specific 
guidelines for Part 15 testing at this time. The Commission states that 
it recognizes that LMS systems employ different methods to provide 
location and monitoring that are constantly changing to keep up with 
consumer demand. Moreover, the Part 15 industry has an even greater 
array of technologies that fluctuate in response to the needs of the 
public. It thus concludes that it would be inappropriate to apply 
uniform testing parameters to those varied technologies, as no one 
testing method would adequately address the needs of either LMS or Part 
15 operations. Instead, the Commission believes that the more prudent 
course of action would be for LMS and Part 15 operators to work closely 
together to reach consensus on testing guidelines that satisfy their 
respective requirements.
    13. Further, the Commission does not agree that its adoption of the 
testing requirement violated the APA. The Commission believes that the 
testing requirement was a logical outgrowth of the Notice of Proposed 
Rule Making in this proceeding, which sought comment on ways to 
accommodate the various users of the 902-928 MHz band. Moreover, it 
concludes that the rules adopted in the LMS Report and Order do not 
modify our Part 15 rules by elevating the status of Part 15 providers, 
as alleged by some petitioners. Part 15 operation remain secondary; the 
testing requirement is merely an attempt to achieve the most efficient 
coexistence possible among the various users of the band.

B. Accommodation of Secondary Users in the 902-928 MHz Band

    14. The LMS Report and Order affirmed that unlicensed Part 15 
devices in the 902-928 MHz band are secondary and, as in other bands, 
may not cause harmful interference to and must accept interference from 
all other operations in the band. To accommodate the concerns of Part 
15 users about their secondary status in light of multilateration LMS 
and our authorizing LMS to use the additional 8 MHz of the band (902-
903, 912-918 and 927-928 MHz), however, the Commission in the LMS 
Report and Order adopted rules that describe a ``safe harbor'' within 
which a Part 15 operation would be deemed not to cause interference to 
a multilateration LMS system.
    15. On reconsideration, many petitioners agreed that a safe harbor 
provision is necessary to provide Part 15 technologies protection 
against claims of interference from existing LMS licensees. On the 
other hand, most LMS petitioners argued that they should be able to 
rebut any presumption of non-interference by Part 15 operators. If not, 
they argued, a large class of Part 15 devices will be immune from 
complaints of interference to multilateration licensees. They also 
contended that such a result would be contrary to the secondary status 
of Part 15 devices.
    16. In the Order on Reconsideration, the Commission clarifies that 
if Part 15 devices operate within the ``safe harbor'' provision they 
will be deemed not to cause harmful interference to LMS operators. In 
addition, this provision applies to all LMS licensees, including 
existing and grandfathered licensees. The Commission notes that in the 
LMS Report and Order, it stated that a definition of what shall 
constitute harmful interference from amateur operations or unlicensed 
Part 15 devices to multilateration LMS systems would promote the 
cooperative use of the 902-928 MHz band. It also noted that this ``safe 
harbor'' approach would promote effective use of the 902-928 MHz band 
by the various services through establishing the parameters under which 
such devices may operate without risk of receiving complaints of 
interference from service providers with a higher allocation status. 
Based on the technical diversity of the numerous existing LMS systems 
and the multiplicity of Part 15 devices that eventually will be placed 
in operation, the Commission concluded in the LMS Report and Order that 
some interference problems would remain unresolved. As a result, the 
Commission determined that by providing multilateration LMS system 
operators a means of recourse by way of complaint to the Commission 
only when a Part 15 device is not operating in the ``safe harbor,'' the 
vast majority of equipment and services would be able to operate 
successfully in this band. The Commission concludes in the Order on 
Reconsideration that although the multilateration LMS system operators 
will not be able to file a complaint with the Commission where the Part 
15 user has satisfied the ``safe harbor'' provisions, the Commission 
encourages LMS operators to resolve the interference by modifying their 
systems or by obtaining the voluntary cooperation of the Part 15 user. 
The Commission disagrees that such a result is inconsistent with the 
secondary status of Part 15 devices under our Rules and believes that 
its approach will assure the efficient and equitable use of the 902-928 
MHz band.

C. Technical Issues

1. Emission Mask Specification
    In the LMS Report and Order, the Commission required that 
licensees' emissions be attenuated by at least 55 + 10 log(P) dB at the 
edges of the specified LMS subbands. The band edges for multilateration 
systems where emissions must be attenuated are 904, 909.75, 919.75, 
921.75, 927.50, 927.75 and 928 MHz. If the 919.75-921.75 and 921.75-
927.25 MHz subbands were aggregated by a single licensee, the emission 
mask limitations at the band edges at 921.75 and 927.50 MHz may be 
ignored. The band edges for non-multilateration systems where emissions 
must be attenuated are 902, 904, 909.75 and 921.75 MHz.
    18. On reconsideration, a group of LMS providers contended that the 
emission mask adopted in the LMS Report and Order is flawed. They 
propose a modification of the emission mask specification that they 
believe should not inhibit the operation of non-multilateration 
systems, and the emission levels outside of the multilateration LMS 
sub-bands would be below the field strength levels permitted under Part 
15 of the Commission's Rules for operation within the 902-928 MHz band. 
The proposed emission mask specification is as follows:

    For LMS wideband emissions, operating in the 902-928 MHz band, 
in any 100 kHz band, the center frequency of which is removed from 
the center of authorized sub-band(s) by more than 50 percent up to 
and including 250 percent of the authorized bandwidth: The mean 
power of emissions shall be attenuated below the maximum permitted 
output power, as specified by the following equation but in no case 
less than 31dB:

A=16+0.4 (P-50)+10logB (attenuation greater than 66dB is not 
required)
Where:

A=attenuation (in decibels) below the maximum permitted output power 
level
P=percent removed from the center of the authorized sub-band(s)
B=authorized bandwidth in megahertz

    19. On the other hand, CellNet, a Part 15 operator, objected to the 
relaxation of the emission mask specification,

[[Page 18984]]

contending that the potential for interference to Part 15 devices will 
be increased if the emission mask requirements are relaxed. Hughes 
contended that the attenuation used in the formula proposed by the LMS 
Providers would be insufficient to protect adequately against 
interference in the portion of the spectrum band set aside for non-
multilateration systems. Thus, Hughes proposed a variation of the LMS 
multilateration parties' formula that requires greater attenuation. The 
Part 15 Coalition contended that there is no justification for relaxing 
the emission mask standard. TIA opposed the justification used by the 
LMS Providers to modify the emission mask specification. TIA pointed 
out that the LMS Providers' proposal is very similar to Sections 
21.106(a)(2) and 94.71(c)(2) of our rules, which specify emission 
limits for the Domestic Public Fixed Radio Services and Private 
Operational Fixed Microwave Service, respectively. Further, TIA 
contended that in fixed services, the emission is but one of several 
ways to prevent interference, while in mobile services emission masks 
and power limits are the primary forms of interference control. It 
contended that while it may be appropriate to base the limits of LMS 
wideband emissions on the limits that apply to high-speed digital 
microwave transmissions, it is not reasonable that the LMS 
specification should be less strict than the fixed microwave 
specification.
    20. In the Order on Reconsideration, the Commission finds that the 
LMS providers have shown that the single emission mask adopted in the 
LMS Report and Order to cover all LMS operations in the 902-928 MHz 
band is not appropriate for multilateration LMS systems. It notes that 
the LMS providers stated that none of their various multilateration 
systems, either existing or proposed, can comply with the existing mask 
and still achieve a commercially marketable level of locating accuracy. 
Additionally, the Commission states that it is persuaded by the LMS 
providers that an emission mask similar to the one applicable to 
narrowband PCS channels is more appropriate for narrowband forward link 
equipment operating in the spectrum between 927.250 MHz and 928 MHz.
    21. Therefore, the Commission states that it will not apply the 
existing mask to equipment used for wideband multilateration links, 
either forward or reverse, in the three subbands 904-909.75 MHz, 
921.75-927.25 MHz and 919.75-921.75 MHz, or to equipment used for 
narrowband forward links in the spectrum between 927.25 and 928 MHz. 
Instead, it will adopt two additional emission masks, both essentially 
the same as proposed by the LMS providers, that will apply to this 
equipment. All other equipment to operate in the LMS will remain 
subject to the emission mask adopted in the Report and Order.
    22. Although these new emission masks are less stringent than the 
one adopted in the Report and Order, they do require a greater 
attenuation of out-of-band emissions than was considered to be required 
for multilateration systems operating under the interim rules. The 
Commission states its belief that these masks are adequate to prevent 
interference to non-multilateration systems. The Commission indicates 
that while TIA is correct that these new masks are less stringent than 
those for fixed microwave links, it does not agree with TIA that the 
masks for LMS multilateration systems must necessarily be more strict 
than for fixed microwave links. These two services are very different 
and the expectations of potential interference must also be 
considerably different--one is a highly coordinated fixed microwave 
service in exclusively allocated spectrum and the other is a mobile 
multilateration system operating in spectrum shared with a multitude of 
other users. Also, the Commission states that it is not persuaded that 
the refinement suggested by Hughes (increasing the slope of the 
wideband mask) is necessary to prevent interference, and that adopting 
it might unnecessarily preclude the use of some technologies or favor 
one type of system over another.
2. Frequency Tolerance
    23. In the LMS Report and Order, the Commission adopted a frequency 
tolerance of 0.00025 percent (2.5 parts per million (ppm)) for both 
multilateration and non-multilateration systems. It noted that tighter 
frequency tolerances were justified to help reduce the potential for 
interference to systems operating on adjacent frequencies.
    24. On reconsideration, Hughes, TI/MFS, and AMTECH requested that 
the Commission relax the frequency tolerance. Hughes argued that the 
0.00025 percent frequency tolerance is overly restrictive for non-
multilateration systems. It contended that a frequency tolerance of 2.5 
ppm does not add significantly to existing means of avoiding 
interference between non-multilateration systems within designated 
subbands. Hughes submitted that since non-multilateration systems 
operate over relatively short ranges, the instances of coverage overlap 
between facilities on adjacent channels will be rare.
    25. Hughes further alleged that the present frequency tolerance 
level would necessitate a significant and expensive design modification 
for their Vehicle to Roadside Communications (VRC) system readers. In 
addition, they contended that equipment changes required to conform 
their VRC mobile transponders to the present frequency tolerance level 
would be economically prohibitive. If the Commission decides to 
maintain the present frequency tolerance level for non-multilateration 
systems, Hughes requested that the Commission apply the frequency 
tolerance level only to the reader transmitters and not to the mobile 
transponders, which are designed to transmit with extremely low power 
and only while passing in close proximity to a reader.
    26. According to TI/MFS there are no current LMS non-
multilateration systems in operation that conform to the 2.5 ppm 
frequency tolerance. They noted that most of the non-multilateration 
technology operates at frequency tolerance levels no greater than 50 
ppm. TI/MFS stated its belief that the imposition of the present 
frequency tolerance level will have the negative effect of decreasing 
both available technology and potential players in the market.
    27. In response to the concerns raised by the non-multilateration 
system operators, the Commission in the Order on Reconsideration 
imposes the present frequency tolerance level of 2.5 ppm on high power 
fixed reader transmitters operating near the band edges, but not on 
mobile transponders or hand-held portable readers. The Commission is 
persuaded that the significant cost of tightening the frequency 
tolerance for mobile transponders and hand-held readers could severely 
raise the cost of the devices beyond the realm of economic feasibility. 
The Commission is not changing the tolerance requirement for other non-
multilateration LMS systems or for multilateration LMS systems.
3. Type Acceptance
    28. In the LMS Report and Order, the Commission determined that the 
mobile nature of most LMS transmitters and the new advanced technology 
that will be employed by this equipment justified strict regulatory 
oversight of having equipment type accepted rather than continuing to 
use the notification procedure. Therefore, it decided that all LMS 
equipment imported or marketed after April 1, 1996, including the 
``transmitting tags'' used in certain non-

[[Page 18985]]

multilateration systems, must be type accepted for use under Part 90. 
If, however, these units met the requirements under Part 15, they may 
have been authorized under that part and do not need to be type 
accepted.
    29. On reconsideration, the LMS providers requested that for 
systems constructed after February 3, 1995, that the type acceptance 
requirement for multilateration LMS be extended from the current date 
of April 1, 1996, until 12 months after any rule on reconsideration 
concerning the emission mask (the ``1996 Effective Date''). They also 
requested that all LMS transmitters imported or manufactured 
domestically prior to the 1996 Effective Date be exempt from type 
acceptance regardless of whether they are used before or after the 1996 
Effective Date. In addition, they asked the Commission to clarify that 
LMS providers may indefinitely continue to use equipment deployed prior 
to the 1996 Effective Date provided that it is not marketed after that 
date (whether the deadline is April 1, 1996 or a later date), unless 
the equipment is first type accepted.
    30. The LMS providers further requested that for systems 
constructed before February 3, 1995, the installation of non-type 
accepted multilateration LMS transmitters imported or manufactured 
domestically on or before the 1996 Effective Date should be permitted 
through April 1, 1998. They urged that such equipment need not be type-
accepted at any time unless such a step is necessary in order to 
resolve interference problems that cannot otherwise be accommodated, 
but that such equipment must comply with the emission mask requirements 
by April 1, 1998. In addition, for systems constructed and placed into 
operation before February 3, 1995, the LMS providers would mandate that 
transmitters imported or manufactured after the 1996 Effective Date 
must be type accepted. Similarly, AMTECH requests that the Commission 
delay the type-acceptance date at least until 12 months after final 
technical requirements have been adopted.
    31. In the Order on Reconsideration, the Commission states its 
belief that the type acceptance requirements it adopted in the LMS 
Report and Order are necessary to ensure efficient deployment of LMS to 
the public without causing significant interference. The Commission 
provides that it recognizes the concern of multilateration LMS 
operators that they may experience difficulty in meeting the 
construction deadline if they must comply with type acceptance 
requirements. To alleviate this concern, the Commission's Office of 
Engineering and Technology has committed to process type acceptance 
applications within 40 days of receipt. Further, the Commission notes 
that it has extended the construction deadline. The Commission 
therefore concludes that compliance with these type acceptance 
requirements should not impede a licensee's efforts to meet the build-
out deadline. It also notes that constructed multilateration LMS 
systems must also meet type acceptance requirements after September 1, 
1996.
    32. The Commission further notes that non-multilateration systems 
contain a substantial amount of embedded equipment with numerous users, 
particularly state and local governments. Thus, non-multilateration 
system operators will be able to continue operation of current 
equipment until replacement is needed. However, if non-multilateration 
system operators decide either to build new systems or replace existing 
equipment on or after September 1, 1996, the Commission states, the new 
equipment must comply with type acceptance by April 1, 1998.
4. Site Relocation
    33. In the LMS Report and Order, the Commission allowed LMS 
licensees to modify their applications to comply with the new band 
plan, and stated that an alternate site must be within two kilometers 
(km) of the site specified in the original license. On reconsideration, 
the LMS providers contended that the two kilometer restriction is 
unworkable due to the upcoming April 1, 1996, deadline for preserving 
grandfathered status. They argued that competition for wireless 
facilities has caused many sites to become unavailable or unsuitable 
for LMS use. They also noted that site surveys and negotiations are 
time-consuming and in many cases replacements within the 2 km radius 
either do not exist or are unavailable. Thus, the LMS providers 
proposed that the Commission instead allow replacement sites within a 
ten-mile radius.
    34. The Commission declines to modify the site relocation 
restriction in the Order on Reconsideration. It notes that the Third 
Report and Order in GN Docket No. 93-252 utilized two kilometers as the 
benchmark for determining whether an application for a site change of a 
CMRS facility is to be treated as a modification application or an 
``initial'' application for the purpose of determining eligibility for 
competitive bidding procedures. Implementation of Sections 3(n) and 332 
of the Communications Act--Regulatory Treatment of Mobile Services, 
Third Report and Order, GN Docket No. 93-252, 9 FCC Rcd 7988, 59 FR 
59945 (Nov. 21, 1994) (CMRS Third Report and Order). The Commission 
concludes that the LMS providers have failed to demonstrate adequately 
that a different benchmark should apply in the LMS context and that it 
will continue to place a 2 km restriction on replacement sites for LMS 
systems.

III. Procedural Matters and Ordering Clauses

    35. The Final Regulatory Flexibility Analysis, as required by 
Section 604 of the Regulatory Flexibility Act of 1980, 5 U.S.C. 
Sec. 604 is as follows:
    36. Need and Purpose of this Action: The rules adopted herein will 
enhance use of the 902-928 MHz band for location and monitoring 
systems. The new rules create a more stable environment for LMS system 
licensees and provides much needed flexibility for operators of such 
systems.
    37. Issues Raised in Response to the Initial Regulatory Flexibility 
Analysis: There were no comments submitted in response to the Initial 
Regulatory Flexibility Analysis.
    38. Significant Alternatives Considered and Rejected: All 
significant alternatives regarding grandfathering issues are discussed 
in this Order on Reconsideration. Other issues raised on 
reconsideration will be addressed in a forthcoming Memorandum Opinion 
and Order.
    39. It is ordered that, pursuant to the authority of Sections 4(i), 
302, 303(r), and 332(a)(2) of the Communications Act of 1934, as 
amended, 47 U.S.C. Secs. 154(i), 302, 303(r), and 332(a), the rule 
changes specified below are adopted.
    40. It is further ordered that the rule changes set forth below 
will become effective May 30, 1996, except for Secs. 90.203(b)(7) and 
90.363(d). Sections 90.203(b)(7) and 90.363(d) were effective March 18, 
1996.1
---------------------------------------------------------------------------

    \1\ Sections 90.203(b)(7) and 90.363(d) extend the type 
acceptance and construction deadlines, respectively, from April 1, 
1996, to September 1, 1996. As such, these rules relieve a 
restriction and are not subject to the 30 days' notice requirement 
of the Administrative Procedure Act (APA). See 5 U.S.C. 553(d)(1). 
Moreover, the Commission finds good cause to make these rules 
effective on less than 30 days' notice to prevent the former type 
acceptance and construction deadline of April 1, 1996, from taking 
effect. See 5 U.S.C. 553(d)(3).
---------------------------------------------------------------------------

    41. It is further ordered that the petitions for reconsideration 
filed by the parties listed in the attachment below are granted to the 
extent discussed herein, and denied to the extent discussed herein. 
Those issues not resolved by this Order on

[[Page 18986]]

Reconsideration will addressed in a future Memorandum Opinion and 
Order.

List of Subjects in 47 CFR Part 90

    Radio.

Federal Communications Commission.
William F. Caton,
Acting Secretary.

Rule Changes

    Part 90 of Chapter I of Title 47 of the Code of Federal Regulations 
is amended as follows:

PART 90--PRIVATE LAND MOBILE RADIO SERVICES

    1. The authority citation for Part 90 continues to read as follows:

    Authority: Secs. 4, 303, 48 Stat. 1066, 1082, as amended; 47 
U.S.C. 154, 303, and 332, unless otherwise noted.

    2. Section 90.203 is amended by revising paragraph (b)(7) to read 
as follows:

Sec. 90.203  Type acceptance required.

* * * * *
    (b) * * *
    (7) Transmitters imported and marketed prior to September 1, 1996 
for use by LMS systems.
* * * * *
    3. Section 90.210 is amended by revising paragraph (k) to read as 
follows:

Sec. 90.210  Emission masks.

* * * * *
    (k) Emission Mask K. (1) Wideband multilateration transmitters. For 
transmitters authorized under Subpart M to provide forward or reverse 
links in a multilateration system in the subbands 904-909.75 MHz, 
921.75-927.25 MHz and 919.75-921.75 MHz, and which transmit an emission 
occupying more than 50 kHz bandwidth: in any 100 kHz band, the center 
frequency of which is removed from the center of authorized sub-band(s) 
by more than 50 percent of the authorized bandwidth, the power of 
emissions shall be attenuated below the transmitter output power, as 
specified by the following equation, but in no case less than 31 dB:

A=16+0.4 (D-50)+10 log B (attenuation greater than 66 dB is not 
required)
Where:

A=attenuation (in decibels) below the maximum permitted output power 
level
D=displacement of the center frequency of the measurement bandwidth 
from the center frequency of the authorized sub-band, expressed as a 
percentage of the authorized bandwidth B
B=authorized bandwidth in megahertz.

    (2) Narrowband forward link transmitters. For LMS multilateration 
narrowband forward link transmitters operating in the 927.25-928 MHz 
frequency band the power of any emission shall be attenuated below the 
transmitter output power (P) in accordance with following schedule:
    On any frequency outside the authorized sub-band and removed from 
the edge of the authorized sub-band by a displacement frequency 
(fd in kHz): at least 116 log ((fd+10)/6.1) dB or 50 + 10 log 
(P) dB or 70 dB, whichever is the lesser attenuation.
    (3) Other transmitters. For all other transmitters authorized under 
Subpart M, the peak power of any emission shall be attenuated below the 
power of the highest emission contained within the authorized channel 
bandwidth in accordance with the following schedule:
    (i) On any frequency within the authorized bandwidth: Zero dB;
    (ii) On any frequency outside of the authorized bandwidth: 
55+10log(P) dB where (P) is the highest emission (watts) of the 
transmitter inside the authorized bandwidth.
    (4) The resolution bandwidth of the instrumentation used to measure 
the emission power shall be 100 kHz, except that, in regard to 
paragraph (2) of this section, a minimum spectrum analyzer resolution 
bandwidth of 300 Hz shall be used for measurement center frequencies 
within 1 MHz of the edge of the authorized subband. If a video filter 
is used, its bandwidth shall not be less than the resolution bandwidth.
    (5) Emission power shall be measured in peak values.
    4. Section 90.213 is amended by revising the entry for the 902-928 
MHz band and adding footnote 13 to the table in paragraph (a) to read 
as follows:

Sec. 90.213  Frequency stability.

    (a) * * *

                       Minimum Frequency Stability                      
                        [Parts per million (ppm)]                       
------------------------------------------------------------------------
                                                     Mobile stations    
                                    Fixed and  -------------------------
      Frequency range (MHz)            base       Over 2W     2W or less
                                     stations      output       output  
                                                   power        power   
------------------------------------------------------------------------
                                                                        
*                *                *                *                *   
                                   *              *                     
902-928 \13\.....................          2.5          2.5          2.5
                                                                        
*                *                *                *                *   
                                  *              *                      
------------------------------------------------------------------------
\13\ Fixed non-multilateration transmitters operating within 40 kHz from
  the band edge, intermittently operated hand-held readers, and mobile  
  transponders are not subject to frequency tolerance restrictions.     

* * * * *
    5. Section 90.363 is amended by revising paragraph (d) to read as 
follows:

Sec. 90.363  Grandfathering provisions for existing AVM Licensees.

* * * * *
    (d) Multilateration AVM licensees for stations that were not 
constructed and placed in operation on or before February 3, 1995 must 
construct their LMS systems and place them in operation on the spectrum 
identified in their LMS system license on or before September 1, 1996, 
or their licenses will cancel automatically (see Section 90.155 (e)). 
Also, these licenses will cancel automatically on July 1, 1996 unless 
timely modification applications are filed on or before this date (see 
paragraph (a) of this section).
* * * * *

Attachment--Petitions for Reconsideration

    Note: This attachment will not be published in the Code of 
Federal Regulations.

1. Ad Hoc Gas Distribution Utilities Coalition (Ad Hoc Gas)
2. AirTouch Teletrac (Teletrac)

[[Page 18987]]

3. The American Radio Relay League, Inc. (ARRL)
4. AMTECH Corporation (AMTECH)
5. CellNet Data Systems, Inc. (CellNet)
6. Connectivity for Learning Coalition
7. Hughes Transportation Management Systems (Hughes)
8. Intelligent Transportation Society of America (ITSA)
9. Metricom, Inc. and Southern California Edison Company (Metricom/
SCE)
10. MobileVision, L.P. (MobileVision)
11. The New Jersey Highway Authority, the New Jersey Turnpike 
Authority, the New York State Thruway Authority, the Pennsylvania 
Turnpike Commission, the Metropolitan Transportation Authority 
Bridges and Tunnels, the Port Authority of New York and New Jersey, 
the South Jersey Transportation Authority and the Delaware River 
Port Authority (``the Interagency Group'').
12. The Part 15 Coalition (Part 15 Coalition)
13. Pinpoint Communications (Pinpoint)
14. Rand McNally & Company (Rand McNally)
15. Safetran Systems Corporation (Safetran)
16. Southwestern Bell Mobile Systems, Inc. (SBMS)
17. Texas Instruments, Inc. and MFS Network Technologies, Inc. (TI/
MFS)
18. Uniplex Corporation (Uniplex)
19. UTC
20. Wireless Transactions Corporation (Wireless Transactions)

[FR Doc. 96-10498 Filed 4-29-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-10467 Office of the Secretary; Environmental Review Procedures for Entities Assuming HUD Environmental Responsibilities
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 19120-19132]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10467]

[[Page 19119]]

_______________________________________________________________________

Part II

Department of Housing and Urban Development

_______________________________________________________________________

24 CFR Part 58

Office of the Secretary; Environmental Review Procedures for Entities 
Assuming HUD Environmental Responsibilities; Final Rule

Federal Register / Vol. 61, No. 84 / Tuesday, April 30, 1996 / Rules 
and Regulations

[[Page 19120]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Part 58

[Docket No. FR-3514-F-04]
RIN 2501-AB67

Office of the Secretary; Environmental Review Procedures for 
Entities Assuming HUD Environmental Responsibilities

AGENCY: Office of the Secretary, HUD.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule makes final two rules, one interim and one proposed, 
which amended the existing environmental regulations in 24 CFR part 58, 
governing entities that assume HUD responsibilities, by making the 
environmental review procedures consistent under the various programs 
to which these regulations apply. This final rule takes into 
consideration the public comments received on both rules, and also 
makes streamlining and editorial changes to the existing environmental 
regulations governing entities that assume HUD responsibilities.

EFFECTIVE DATE: This rule becomes effective May 30, 1996, except for 
Sec. 58.1(b)(6)(i) and Sec. 58.2(a)(5)(v)(A), which pertain to public 
housing development and modernization programs. These sections will 
become effective on October 14, 1996, unless the Department publishes a 
document in the Federal Register that specifies a different effective 
date.

FOR FURTHER INFORMATION CONTACT: Richard H. Broun, Director, Office of 
Environment and Energy, Room 7240, Department of Housing and Urban 
Development, 451 Seventh Street, S.W., Washington, DC 20410, telephone 
(202) 708-2894. For telephone communication, contact Fred Regetz, 
Environmental Review Division at (202) 708-1201. Hearing or speech-
impaired individuals may call the Federal Information Relay Service 
number at 1-800-877-TTY (1-800-877-8339) and refer to (202) 708-1201.

SUPPLEMENTARY INFORMATION:

I. Background

    This final rule revises and restates the procedures for recipients 
of HUD assistance and other responsible entities in applicable HUD 
programs to carry out environmental reviews in accordance with the 
National Environmental Policy Act of 1969 (42 U.S.C. 4321-4347) 
(``NEPA''), the NEPA implementing regulations of the Council on 
Environmental Quality (CEQ), and other NEPA related federal laws. This 
rule makes final two rules, one interim rule and one proposed rule, 
which amended 24 CFR part 58. The interim rule was published on March 
13, 1995 (60 FR 13518), and the proposed rule was published on 
September 25, 1995 (60 FR 49466). This final rule takes into 
consideration the public comments received on both rules.
    Applicable HUD programs under 24 CFR part 58 include any program in 
which specific statutory authority allows the environmental review 
responsibilities to be assumed by responsible entities. Currently, 
applicable HUD programs, and therefore those covered by part 58, only 
include: (1) Title I Community Development Block Grant Programs, (2) 
the Rental Rehabilitation Program and the Housing Development Grant 
Program, (3) the HOME programs under the Cranston-Gonzalez National 
Affordable Housing Act (NAHA), (4) the homeless programs authorized by 
Title IV of the Stewart B. McKinney Homeless Assistance Act, (5) Grants 
to States and units of general local government for reduction and 
abatement of lead-based paint, (6) Indian Housing and most Section 8 
programs under Title I of the United States Housing Act of 1937, (7) 
Special projects appropriated under an appropriation Act of HUD, (8) 
the FHA Multifamily Housing Finance Agency Pilot Program under section 
542(c) of the Housing and Community Development Act of 1992, and (9) 
the Self-Help Homeownership Opportunity Program under section 11 of the 
Housing Opportunity Program Extension Act of 1996.
    The interim and proposed rules did not refer to the last program 
cited above, the Self-Help Homeownership Opportunity Program, because 
the Housing Opportunity Program Extension Act was approved on March 28, 
1996, after those rules were published. However, section 11(m) of that 
Act provides that a grant under that program shall be considered to be 
funds for a special project for purposes of section 305(c) of the 
Multifamily Housing Property Disposition Reform Act of 1994, which 
authorized the provisions in the current interim rule providing for 
States and units of general local government to assume environmental 
responsibilities for special projects under item (7) above. 
Accordingly, grants under the new Self-Help Homeownership Opportunity 
Program are already subject to the part 58 procedures, by being 
considered special project funds. The final rule adds specific 
references to the new program in order to provide a complete list of 
programs currently subject to part 58.

II. Discussion of Public Comments on the March 13, 1995 Interim Rule

    The Department received two comments on the March 13, 1995 interim 
rule--one from a State housing development authority and one from a 
national organization of State housing agencies.
    Both commenters requested, with respect to the FHA Multifamily 
Housing Finance Agency Pilot Program in particular, that the rule 
clarify that State housing finance agencies (HFAs) may assume 
environmental responsibilities. The Department has not changed the 
final rule in response to these comments. Section 542(c)(9) of the 
Housing and Community Development Act of 1992, as amended, provides 
that the Secretary of HUD may provide for agreements to endorse 
mortgages for insurance ``upon the request of qualified housing finance 
agencies * * *, if the State or unit of general local government, as 
designated by the Secretary in accordance with regulations, assumes'' 
environmental responsibilities.
    However, the Department agrees that a State HFA may assume the 
responsibility for environmental reviews on behalf of the State if the 
HFA is an agency of the State government and is given authority to do 
so by the State. If an official of the State HFA will act as the 
Certifying Officer for the State, section 542 (c) requires that the 
official must have the authority to certify, among other things, that 
he or she ``is authorized and consents on behalf of the State * * * and 
himself or herself'' to accept Federal court jurisdiction for 
enforcement of the environmental responsibilities (emphasis added). The 
Certifying Officer's responsibilities are set out in Sec. 58.13 of the 
rule, which indicates that he or she must represent the responsible 
entity, e.g., the State, rather than merely the State HFA.
    Even where the State's Certifying Officer is outside the HFA, the 
HFA may contribute information or prepare a draft environmental 
assessment for the State, but the Certifying Officer must evaluate this 
work and take responsibility for the review in accordance with 40 CFR 
1506.5 of the regulations of the Council on Environmental Quality.
    One of the commenters, citing statements in Secs. 58.4(b) and 58.10 
of the interim rule that responsible entities ``shall'' or ``must'' 
assume environmental review responsibilities, requested that the final 
rule clarify that

[[Page 19121]]

the assumption of environmental responsibilities is voluntary. The 
Department agrees that assumption of environmental responsibilities by 
non-recipient recipient responsible entities is voluntary. However, the 
Department has concluded that no change in the rule is necessary on 
this point. The cited language (which is similar in the final rule) 
must be read in conjunction with Sec. 58.11(d) of the interim and final 
rules. Section 58.11(d) indicates that if a responsible entity, other 
than a recipient, objects to performing an environmental review, or if 
HUD may designate another responsible entity to perform the review or 
may perform the review itself.

III. Discussion of Public Comments on the September 25, 1995 Proposed 
Rule

    The Department received 11 comments on the September 25, 1995 
proposed rule. The Department received four from local governments, 
three from county governments, two from State housing agencies, and two 
from special interest groups. As a result of these, the Department has 
made certain changes to the proposed rule which are incorporated into 
today's final rule. The following discussion summarizes and provides 
HUD responses to those comments. Every comment was reviewed and 
considered, although all comments may not be specifically addressed in 
this preamble.
    One city urged HUD to conduct a detailed federalism analysis in 
accordance with Executive Order 12612 on Federalism before taking any 
further action on this proposed rule. The charge is made that the 
proposed rule would constitute an unfunded mandate on local governments 
by transferring to States and local governments various environmental 
functions previously performed by HUD. This final rule does not change 
any requirements that were not in effect or put in effect by the 
interim rule, published in the Federal Register on March 13, 1995 (60 
FR 13518) that became effective on April 12, 1995.
    The second issue raised by this city was that the tenant-based 
Section 8 Existing Housing Program should be exempt from all 
environmental review requirements. Section 58.35(b)(1) makes all 
tenant-based rental assistance essentially exempt, except for 
extraordinary circumstances in which a categorically excluded activity 
may have a significant environmental effect.
    A second city requested that Sec. 58.34(a)(2) be more declarative 
with respect to environmental review requirements for payment of 
principal and/or interest to the Federal government. A change in 
Sec. 58.34(a) was made to preserve and make more generic the exemption 
for payments of principal and interest that is in the interim rule.
    A third city suggested that the final rule should make changes that 
would allow local communities more latitude in applying section 106 of 
the National Historic Preservation Act and applicable regulations in 36 
CFR part 800. The Department does not have the authority to effect 
changes in the procedures of the State Historic Preservation Officer 
(SHPO) or to allow local communities more autonomy in determining which 
resources are historically significant.
    A fourth city made a number of suggestions to be more specific and/
or carry over some specific language in the interim rule into this 
final rule. Some clarifications have been made in Sec. 58.35 of the 
final rule.
    One county housing agency wanted more clarification about what 
would be considered ``adequate local news media'' when disseminating 
information to the public. Adequate local news media would be 
considered to be at least a newspaper of general circulation in the 
affected community. A change has also been made in Sec. 58.21 to 
clarify that when there is no publication of Notices, the time periods 
start when there is a mailing and posting of a Finding of No 
Significant Impact (FONSI) or the Notice of Intent to Request Release 
of Funds (NOI/RROF). In addition, this county wanted a definition of 
``an individual action'' in reference to the categorical exclusion of 
one- to four-family dwellings. Some clarifications have been made to 
Sec. 58.35 to reflect current practices with respect to categorical 
exclusions.
    A second county agency felt there was a contradiction in the 
requirement for the responsible entity to address in the Environmental 
Review Record (ERR) its compliance with Sec. 58.6 while Sec. 58.34 of 
the proposed rule stated that the responsible entity does not have to 
comply with the environmental requirements of this part in the case of 
exempt activities. The requirements of Sec. 58.6 must be complied with 
and the responsible entity is required to address these requirements 
where applicable. These requirements apply to exempt activities, when 
there is no requirement for an environmental certification by the 
certifying officer that indicates that all environmental requirements 
have been met. A change has been made in Sec. 58.34 to remove this 
contradiction.
    A third county agency suggested that the Housing Opportunities for 
Persons With AIDS (HOPWA) program should be reviewed under part 58 
because HOPWA projects are often funded jointly with CDBG. HUD has no 
authority to assign this responsibility to local governments. However, 
part 50 and part 58 reviews should not be done in such a manner that 
there is duplication. If a review has already been made of a jointly 
funded proposal, the prior review can be referenced in subsequent 
reviews. The county agency suggested additions to Sec. 58.2 that would 
define in more detail ``financial services'' and when a decrease in 
unit density would require an environmental review.
    The Department feels that these terms are adequately defined in 
Secs. 58.34(a)(2) and 58.35(a) and that further detail would not be 
appropriate. The county agency also raised a question about the 
proposed deletion of the reference to Section 108 loans from 
Sec. 58.34(a) of the interim rule. The intent of this rule is to make 
requirements more generic and not be program specific. In response to 
comments, there is no change in the exempt classification of the 
repayment of Section 108 loans to the Federal government and the 
comment is addressed generically in Sec. 58.34(a)(11). This county 
suggested that changes be made in Sec. 58.47 to address a concern about 
when there is a need to re-evaluate an environmental finding. Changes 
have been made in Sec. 58.47 to expand the context when a change in 
conditions or a change in funding would require a re-evaluation.
    One State housing agency requested that Sec. 58.35(b)(5) be 
expanded to include homeownership assistance for new housing that is 
planned but may or may not yet be built. In response to this comment, 
the final rule expands this exclusion to cover assistance to homebuyers 
for units under construction as well as existing housing. However, 
housing that is not yet under construction cannot be covered by this 
exclusion because Sec. 58.53(b) does not require compliance with the 
environmental laws and authorities listed in Sec. 58.5. Assistance to 
purchase housing yet to be constructed, on a limited scale, as 
identified in Sec. 58.35(a)(4), can be determined to be categorically 
excluded, but it cannot be exempt from the requirements of Sec. 58.5.
    A second State agency suggested that environmental reviews 
conducted by other entities on co-funded projects should be used 
whenever possible. This final rule encourages combining reviews 
conducted by other entities for jointly funded projects.
    A national county association wanted to know what was meant by 
``broader review'' in Sec. 58.15 on Tiering. The tiering concept is 
explained very well in

[[Page 19122]]

the NEPA regulations of the Council on Environmental Quality but 
focuses on tiering in EIS situations. This final rule encourages the 
use of the tiering concept in non-EIS situations. Tiering, for HUD 
purposes, allows responsible entities that have assumed Federal 
environmental responsibilities to complete an environmental review and 
obtain a release of funds from HUD before the specific properties to be 
treated have been identified. Once the properties have been identified, 
the responsible entity must comply with environmental laws and 
authorities that could not be satisfied until the properties were 
identified. The responsible entity may use any available environmental 
information. Compliance with section 106 of the National Historic 
Preservation Act would normally occur when the properties to be treated 
have been identified.
    Another commenter requested that the proposed change to Sec. 58.22 
prohibiting recipients from committing local (non-HUD) funds before the 
approval of RROF be dropped in favor of the language in the present 
interim rule. This suggestion has not been adopted, since the language 
of proposed Sec. 58.22 better reflects the intent of the Council on 
Environmental Quality regulation.
    The Department also received a comment on the Home Investment 
Partnership Program interim rule published on July 12, 1995 (60 FR 
36020) that is relevant to this rule. The comment objected to the 
requirement contained in the Home environmental guidelines, and also 
contained in proposed Sec. 58.22, that options on property entered into 
before completion of the environmental review be refundable, since 
refundability is not generally a provision for refundable options in 
favor of options being limited to a nominal portion of the purchase 
price.

IV. Other Matters

Environmental Impact

    A Finding of No Significant Impact (FONSI) with respect to the 
environment was made in connection with development of the September 
25, 1995 proposed rule in accordance with HUD regulations in 24 CFR 
Part 50 which implement Section 102(2)(C) of the National Environmental 
Policy Act (NEPA). Since the changes made to the proposed rule in this 
final rule do not change the impact on the environment, the original 
Finding is still valid. The original Finding is available for public 
inspection during regular business hours in the Office of the General 
Counsel, Rules Docket Clerk, at the above address.

Executive Order 12612, Federalism

    The General Counsel, as the Designated Official under section 6(a) 
of Executive order 12612, Federalism, has determined that the policies 
contained in this rule will not have substantial direct effects on 
States or their political subdivisions, or the relationship between the 
Federal government and the States, or on the distribution of power and 
responsibilities among the various levels of government. As a result, 
the rule is not subject to review under the order. Specifically, this 
final rule modifies environmental requirements for recipients of HUD 
assistance and other entities that assume environmental review 
responsibilities for activities and projects where specific statutory 
authority exists to assign the environmental review responsibilities to 
the recipients or to allow States and local governments to assume those 
responsibilities on behalf of certain recipients.

Executive Order 12606, The Family

    The General Counsel, as the Designated Official under Executive 
Order, The Family, has determined that this final rule will not have 
potential for significant impact on family formation, maintenance, and 
general well-being, and, thus, is not subject to review under the 
order. No significant change in existing HUD policies or programs will 
result from promulgation of this final rule, as those policies and 
programs relate to family concerns.
    Regulatory Flexibility Act. The Secretary, in accordance with the 
Regulatory Flexibility Act (5 U.S.C. 605(b)) has reviewed and approved 
this rule, and in so doing certifies that this final rule will not have 
a significant economic impact on a substantial number of small 
entities. This final rule streamlines part 58 and carries out the 
statutory mandate of providing for the assumption of environmental 
review responsibilities by certain recipients of HUD assistance or 
other entities in accordance with section 104(g) of the Housing and 
Community Development Act of 1974 and similar statutory provisions.

List of Subjects in 24 CFR Part 58

    Environmental protection, Community Development Block Grants, 
Environmental impact statements, Grant programs--housing and community 
development, Reporting and recordkeeping requirements.

    Accordingly, 24 CFR part 58 is revised as follows:

PART 58--ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD 
ENVIRONMENTAL RESPONSIBILITIES

Subpart A--Purpose, Legal Authority, Federal Laws and Authorities

Sec.
58.1  Purpose, scope and applicability.
58.2  Terms, abbreviations and definitions.
58.4  Assumption authority.
58.5  Related Federal laws and authorities.
58.6  Other requirements.

Subpart B--General Policy: Responsibilities of Responsible Entities

58.10  Basic environmental responsibility.
58.11  Legal capacity and performance.
58.12  Technical and administrative capacity.
58.13  Responsibilities of the certifying officer.
58.14  Interaction with State, Federal and non-Federal entities.
58.15  Tiering.
58.17  Historic Preservation requirements for prior section 17 
grants.
58.18  Responsibilities of States Assuming HUD Responsibilities.

Subpart C--General Policy: Environmental Review Procedures

58.21  Time periods.
58.22  Limitations on activities pending clearance.
58.23  Financial assistance for environmental review.
Subpart D--Environmental Review Process: Documentation, Range of 
Activities, Project Aggregation and Classification
58.30  Environmental Review Process.
58.32  Project aggregation.
58.33  Emergencies.
58.34  Exempt activities.
58.35  Categorical exclusions.
58.36  Environmental assessments.
58.37  Environmental impact statement determinations.
58.38  Environmental review record.
Subpart E--Environmental Review Process: Environmental Assessments 
(EA's)
58.40  Preparing the environmental assessment.
58.43  Dissemination and/or publication of the findings of no 
significant impact.
58.45  Public comment periods.
58.46  Time delays for exceptional circumstances.
58.47  Re-evaluation of environmental assessments and other 
environmental findings.
Subpart F--Environmental Review Process: Environmental Impact Statement 
Determinations
58.52  Adoption of other agencies' EISs.
58.53  Use of prior environmental impact statements.
Subpart G--Environmental Review Process: Procedures for Draft, Final 
and Supplemental Environmental Impact Statements
58.55  Notice of intent to prepare an EIS.
58.56  Scoping process.

[[Page 19123]]

58.57  Lead agency designation.
58.59  Public hearings and meetings.
58.60  Preparation and filing of environmental impact statements.

Subpart H--Release of Funds for Particular Projects

58.70  Notice of intent to request release of funds.
58.71  Request for release of funds and certification.
58.72  HUD or State actions on RROFs and certifications.
58.73  Objections to release of funds.
58.74  Time for objecting.
58.75  Permissible bases for objections.
58.76  Procedure for objections.
58.77  Effect of approval of certification.

    Authority: 12 U.S.C. 1707 note; 42 U.S.C. 1437o(i)(1) and (2), 
1437x, 3535(d), 3547, 4332, 4852, 5304(g), 11402, and 12838; E.O. 
11514, 3 CFR, 1966-1970, Comp., p. 902, as amended by E.O. 11991, 3 
CFR, 1977 Comp., p.123.

Subpart A--Purpose, Legal Authority, Federal Laws and Authorities

Sec. 58.1  Purpose, scope and applicability.

    (a) Purpose. This part provides instructions and guidance to 
recipients of HUD assistance and other responsible entities for 
conducting an environmental review for a particular project or activity 
and for obtaining approval of a Request for Release of Funds.
    (b) Applicability. This part applies to activities and projects 
where specific statutory authority exists for recipients or other 
responsible entities to assume environmental responsibilities. Programs 
and activities subject to this part include:
    (1) Community Development Block Grant programs authorized by Title 
I of the Housing and Community Development Act of 1974, in accordance 
with section 104(g) (42 U.S.C. 5304(g));
    (2) The Rental Rehabilitation program and Housing Development Grant 
program authorized by section 17 of the United States Housing Act of 
1937, in accordance with sections 17(i)(1) and 17(i)(2) with respect to 
projects and programs for which binding commitments have been entered 
into prior to October 1, 1991, since section 17 was repealed by the 
Cranston-Gonzalez National Affordable Housing Act enacted November 28, 
1990 (42 U.S.C. 1437o(i)(1) and (2));
    (3) Grants to States and units of general local government under 
the Emergency Shelter Grant Program, Supportive Housing program (and 
its predecessors, the Supportive Housing Demonstration program (both 
Transitional Housing and Permanent Housing for Homeless Persons with 
Disabilities) and Supplemental Assistance for Facilities to Assist the 
Homeless), Shelter Plus Care program, Safe Havens for Homeless 
Individuals Demonstration Program, and Rural Homeless Housing 
Assistance, authorized by Title IV of the Stewart B. McKinney Homeless 
Assistance Act, in accordance with section 443 (42 U.S.C. 11402);
    (4) The HOME Investment Partnerships Program authorized by Title II 
of the Cranston-Gonzalez National Affordable Housing Act (NAHA), in 
accordance with section 288 (42 U.S.C. 12838);
    (5) Grants to States and units of general local government for 
abatement of lead-based paint and lead dust hazards pursuant to Title 
II of the Departments of Veterans Affairs and Housing and Urban 
Development and Independent Agencies Appropriations Act, 1992, and 
grants for lead-based paint hazard reduction under section 1011 of the 
Housing and Community Development Act of 1992, in accordance with 
section 1011(o) (42 U.S.C. 4852(o));
    (6)(i) Public Housing Programs under Title I of the United States 
Housing Act of 1937, in accordance with section 26 (42 U.S.C. 1437x);
    (ii) Indian Housing Programs under Title I of the United States 
Housing Act of 1937, including the Mutual Help Program, in accordance 
with section 26 (42 U.S.C. 1437x); and
    (iii) Assistance administered by a public housing agency or Indian 
housing authority under section 8 of the United States Housing Act of 
1937, except for assistance provided under 24 CFR part 886, in 
accordance with section 26 (42 U.S.C. 1437x);
    (7) Special Projects appropriated under an appropriation act for 
HUD, such as special projects under the heading ``Annual Contributions 
for Assisted Housing'' in Title II of various Departments of Veterans 
Affairs and Housing and Urban Development, and Independent Agencies 
Appropriations Acts, in accordance with section 305(c) of the 
Multifamily Housing Property Disposition Reform Act of 1994 (42 U.S.C. 
3547);
    (8) The FHA Multifamily Housing Finance Agency Pilot Program under 
section 542(c) of the Housing and Community Development Act of 1992, in 
accordance with section 542(c)(9)(12 U.S.C. 1707 note); and
    (9) The Self-Help Homeownership Opportunity Program under section 
11 of the Housing Opportunity Program Extension Act of 1996 (Pub. L. 
104-120, 110 Stat. 834), in accordance with section 11(m)).

Sec. 58.2  Terms, abbreviations and definitions.

    (a) For the purposes of this part, the following definitions 
supplement the uniform terminology provided in 40 CFR part 1508:
    (1) Activity means an action that a grantee or recipient puts forth 
as part of an assisted project, regardless of whether its cost is to be 
borne by the HUD assistance or is an eligible expense under the HUD 
assistance program.
    (2) Certifying Officer means the official who is authorized to 
execute the Request for Release of Funds and Certification and has the 
legal capacity to carry out the responsibilities of Sec. 58.13.
    (3) Extraordinary Circumstances means a situation in which an 
environmental assessment (EA) or environmental impact statement (EIS) 
is not normally required, but due to unusual conditions, an EA or EIS 
is appropriate. Indicators of unusual conditions are:
    (i) Actions that are unique or without precedent;
    (ii) Actions that are substantially similar to those that normally 
require an EIS;
    (iii) Actions that are likely to alter existing HUD policy or HUD 
mandates; or
    (iv) Actions that, due to unusual physical conditions on the site 
or in the vicinity, have the potential for a significant impact on the 
environment or in which the environment could have a significant impact 
on users of the facility.
    (4) Project means an activity, or a group of integrally related 
activities, designed by the recipient to accomplish, in whole or in 
part, a specific objective.
    (5) Recipient means any of the following entities, when they are 
eligible recipients or grantees under a program listed in Sec. 58.1(b):
    (i) A State that does not distribute HUD assistance under the 
program to a unit of general local government;
    (ii) Guam, the Northern Mariana Islands, the Virgin Islands, 
American Samoa, and Palau;
    (iii) A unit of general local government;
    (iv) An Indian tribe;
    (v) (A) With respect to Public Housing Programs under 
Sec. 58.1(b)(6)(i), a public housing agency;
    (B) With respect to Indian Housing Programs under 
Sec. 58.1(b)(6)(ii), an Indian housing authority;
    (C) With respect to section 8 assistance under 
Sec. 58.1(b)(6)(iii), a public housing agency or Indian housing 
authority;
    (vi) Any direct grantee of HUD for a special project under 
Sec. 58.1(b)(7);

[[Page 19124]]

    (vii) With respect to the FHA Multifamily Housing Finance Agency 
Pilot Program under Sec. 58.1(b)(8), a qualified housing finance 
agency; and
    (viii) With respect to the Self-Help Homeownership Opportunity 
Program under Sec. 58.1(b)(9), any direct grantee of HUD.
    (6) Release of funds. In the case of the FHA Multifamily Housing 
Finance Agency Pilot Program under Sec. 58.1(b)(8), Release of Funds, 
as used in this part, refers to HUD issuance of a firm approval letter, 
and Request for Release of Funds refers to a recipient's request for a 
firm approval letter.
    (7) Responsible Entity means:
    (i) With respect to environmental responsibilities under programs 
listed in Sec. 58.1(b)(1) through (5), a recipient under the program.
    (ii) With respect to environmental responsibilities under the 
programs listed in Sec. 58.1(b)(6) through (9), a State, unit of 
general local government, Indian tribe or Alaska native village, when 
it is the recipient under the program. Non-recipient responsible 
entities are designated as follows:
    (A) For qualified housing finance agencies, the State or a unit of 
general local government, Indian tribe or Alaska native village whose 
jurisdiction contains the project site;
    (B) For public housing agencies, the unit of general local 
government within which the project is located that exercises land use 
responsibility, or if HUD determines this infeasible, the county, or if 
HUD determines this infeasible, the State;
    (C) For non-profit organizations and other entities, the unit of 
general local government, Indian tribe or Alaska native village within 
which the project is located that exercises land use responsibility, or 
if HUD determines this infeasible, the county, or if HUD determines 
this infeasible, the State;
    (D) For Indian housing authorities (outside of Alaska), the Indian 
tribe in whose jurisdiction the project is located, or if the project 
is located outside of a reservation, the Indian tribe that established 
the authority; and
    (E) For Indian housing authorities in Alaska, the Alaska native 
village in whose community the project is located, or if HUD determines 
this infeasible, a unit of general local government or the State, as 
designated by HUD.
    (8) Unit Density refers to a change in the number of dwelling 
units. Where a threshold is identified as a percentage change in 
density that triggers review requirements, no distinction is made 
between an increase or a decrease in density.
    (9) Tiering means the evaluation of an action or an activity at 
various points in the development process as a proposal or event 
becomes ripe for an Environment Assessment or Review.
    (10) Vacant Building means a habitable structure that has been 
vacant for more than one year.
    (b) The following abbreviations are used throughout this part:

(1) CDBG--Community Development Block Grant;
(2) CEQ--Council on Environmental Quality;
(3) EA--Environmental Assessment;
(4) EIS--Environmental Impact Statement;
(5) EPA--Environmental Protection Agency;
(6) ERR--Environmental Review Record;
(7) FONSI--Finding of No Significant Impact;
(8) HUD--Department of Housing and Urban Development;
(9) NAHA--Cranston-Gonzalez National Affordable Housing Act of 1990;
(10) NEPA--National Environmental Policy Act of 1969, as amended;
(11) NOI/EIS--Notice of Intent to Prepare an EIS;
(12) NOI/RROF--Notice of Intent to Request Release of Funds;
(13) ROD--Record of Decision;
(14) ROF--Release of Funds; and
(15) RROF--Request for Release of Funds.

Sec. 58.4  Assumption authority.

    (a) Assumption authority for responsible entities: General. 
Responsible entities shall assume the responsibility for environmental 
review, decision-making, and action that would otherwise apply to HUD 
under NEPA and other provisions of law that further the purposes of 
NEPA, as specified in Sec. 58.5. Responsible entities that receive 
assistance directly from HUD assume these responsibilities by execution 
of a grant agreement with HUD and/or a legally binding document such as 
the certification contained on HUD Form 7015.15, certifying to the 
assumption of environmental responsibilities. When a State distributes 
funds to a responsible entity, the State must provide for appropriate 
procedures by which these responsible entities will evidence their 
assumption of environmental responsibilities.
    (b) Particular responsibilities of the States. (1) States are 
recipients for purposes of directly undertaking a State project and 
must assume the environmental review responsibilities for the State's 
activities and those of any non-governmental entity that may 
participate in the project. In this case, the State must submit the 
certification and RROF to HUD for approval.
    (2) States must exercise HUD's responsibilities in accordance with 
Sec. 58.18, with respect to approval of a unit of local government's 
environmental certification and RROF for a HUD assisted project funded 
through the State, except for projects assisted by Section 17 Rental 
Rehabilitation assistance and Housing Development Grants. Approval by 
the State of a unit of local government's certification and RROF 
satisfies the Secretary's responsibilities under NEPA and the related 
laws cited in Sec. 58.5.
    (3) For section 17 Rental Rehabilitation projects and Housing 
Development Grants, the State agency shall meet the responsibilities 
set forth in Sec. 58.18. However, for section 17 projects, the State 
lacks authority to approve RROFs and therefore must forward to the 
responsible HUD Field Office the local recipient's certification and 
RROF, any objections to the release of funds submitted by another 
party, and the State's recommendation as to whether HUD should approve 
the certification and the RROF.

Sec. 58.5  Related Federal laws and authorities.

    In accordance with the provisions of law cited in Sec. 58.1(b), the 
responsible entity must assume responsibilities for environmental 
review, decision-making and action that would apply to HUD under the 
following specified laws and authorities. The responsible entity must 
certify that it has complied with the requirements that would apply to 
HUD under these laws and authorities and must consider the criteria, 
standards, policies and regulations of these laws and authorities.
    (a) Historic properties. (1) The National Historic Preservation Act 
of 1966 as amended (16 U.S.C. 470 et seq.), particularly sections 106 
and 110 (16 U.S.C. 470 and 470h-2), except as provided in Sec. 58.17 
for Section 17 projects.
    (2) Executive Order 11593, Protection and Enhancement of the 
Cultural Environment, May 13, 1971 (36 FR 8921), 3 CFR 1971-1975 Comp., 
p. 559, particularly section 2(c).
    (3) Federal historic preservation regulations as follows:
    (i) 36 CFR part 800 with respect to HUD programs other than Urban 
Development Action Grants (UDAG); and
    (ii) 36 CFR part 801 with respect to UDAG.
    (4) The Reservoir Salvage Act of 1960 as amended by the 
Archeological and Historic Preservation Act of 1974 (16

[[Page 19125]]

U.S.C. 469 et seq.), particularly section 3 (16 U.S.C. 469a-1).
    (b) Floodplain management and wetland protection. (1) Executive 
Order 11988, Floodplain Management, May 24, 1977 (42 FR 26951), 3 CFR, 
1977 Comp., p. 117, as interpreted in HUD regulations at 24 CFR part 
55, particularly section 2(a) of the order (For an explanation of the 
relationship between the decision-making process in 24 CFR part 55 and 
this part, see Sec. 55.10 of this subtitle A.)
    (2) Executive Order 11990, Protection of Wetlands, May 24, 1977 (42 
FR 26961), 3 CFR, 1977 Comp., p. 121, particularly sections 2 and 5.
    (c) Coastal Zone Management. The Coastal Zone Management Act of 
1972 (16 U.S.C. 1451 et seq.), as amended, particularly section 307(c) 
and (d) (16 U.S.C. 1456(c) and (d)).
    (d) Sole source aquifers. (1) The Safe Drinking Water Act of 1974 
(42 U.S.C. 201, 300(f) et seq., and 21 U.S.C. 349) as amended; 
particularly section 1424(e)(42 U.S.C. 300h-3(e)).
    (2) Sole Source Aquifers (Environmental Protection Agency--40 CFR 
part 149).
    (e) Endangered species. The Endangered Species Act of 1973 (16 
U.S.C. 1531 et seq.) as amended, particularly section 7 (16 U.S.C. 
1536).
    (f) Wild and scenic rivers. The Wild and Scenic Rivers Act of 1968 
(16 U.S.C. 1271 et seq.) as amended, particularly section 7(b) and (c) 
(16 U.S.C. 1278(b) and (c)).
    (g) Air quality. (1) The Clean Air Act (42 U.S.C. 7401 et. seq.) as 
amended; particularly section 176(c) and (d) (42 U.S.C. 7506(c) and 
(d)).
    (2) Determining Conformity of Federal Actions to State or Federal 
Implementation Plans (Environmental Protection Agency-- 40 CFR parts 6, 
51, and 93).
    (h) Farmlands protection. (1) Farmland Protection Policy Act of 
1981 (7 U.S.C. 4201 et seq.) particularly sections 1540(b) and 1541 (7 
U.S.C. 4201(b) and 4202).
    (2) Farmland Protection Policy (Department of Agriculture--7 CFR 
part 658).
    (i) HUD environmental standards. Applicable criteria and standards 
specified in HUD environmental regulations (24 CFR part 51) (other than 
the runway clear zone and clear zone notification requirement in 24 CFR 
51.303 (a)(3)) and HUD Notice 79-33, Policy Guidance to Address the 
Problems Posed by Toxic Chemicals and Radioactive Materials, September 
10, 1979).
    (j) Environmental justice. Executive Order 12898--Federal Actions 
to Address Environmental Justice in Minority Populations and Low-Income 
Populations, February 11, 1994 (59 FR 7629), 3 CFR, 1994 Comp. p. 859.

Sec. 58.6  Other requirements.

    In addition to the duties under the laws and authorities specified 
in Sec. 58.5 for assumption by the responsible entity under the laws 
cited in Sec. 58.1(b), the responsible entity must comply with the 
following requirements. Applicability of the following requirements 
does not trigger the certification and release of funds procedure under 
this part or preclude exemption of an activity under Sec. 58.34(a)(11) 
and/or the applicability of Sec. 58.35(b). However, the responsible 
entity remains responsible for addressing the following requirements in 
its ERR and meeting these requirements, where applicable, regardless of 
whether the activity is exempt under Sec. 58.34 or categorically 
excluded under Sec. 58.35(a) or (b).
    (a)(1) Under the Flood Disaster Protection Act of 1973, as amended 
(42 U.S.C. 4001-4128), Federal financial assistance for acquisition and 
construction purposes (including rehabilitation) may not be used in an 
area identified by the Federal Emergency Management Agency (FEMA) as 
having special flood hazards, unless:
    (i) The community in which the area is situated is participating in 
the National Flood Insurance Program (see 44 CFR parts 59 through 79), 
or less than one year has passed since the FEMA notification regarding 
such hazards; and
    (ii) Flood insurance protection is to be obtained as a condition of 
the approval of financial assistance to the property owner.
    (2) Where a recipient provides financial assistance for acquisition 
or construction purposes (including rehabilitation) for property 
located in an area identified by FEMA as having special flood hazards, 
the responsible entity is responsible for assuring that flood insurance 
under the National Flood Insurance Program is obtained and maintained.
    (3) Paragraph (a) of this section does not apply to Federal formula 
grants made to a State.
    (b) Pursuant to the Coastal Barrier Resources Act, as amended by 
the Coastal Barrier Improvement Act of 1990 (16 U.S.C. 3501), HUD 
assistance may not be used for most activities proposed in the Coastal 
Barrier Resources System.
    (c) In all cases involving HUD assistance, subsidy, or insurance 
for the purchase or sale of an existing property in a Runway Clear Zone 
or Clear Zone, as defined in 24 CFR part 51, the responsible entity 
shall advise the buyer that the property is in a runway clear zone or 
clear zone, what the implications of such a location are, and that 
there is a possibility that the property may, at a later date, be 
acquired by the airport operator. The buyer must sign a statement 
acknowledging receipt of this information.

Subpart B--General Policy: Responsibilities of Responsible Entities

Sec. 58.10  Basic environmental responsibility.

    In accordance with the provisions of law cited in Sec. 58.1(b), the 
responsible entity must assume the environmental responsibilities for 
projects under programs cited in Sec. 58.1(b), and in doing so must 
comply with the provisions of NEPA and the CEQ regulations contained in 
40 CFR parts 1500 through 1508, including the requirements set forth in 
this part. This includes responsibility for compliance with the 
applicable provisions and requirements of the Federal laws and 
authorities specified in Sec. 58.5. The provisions of the CEQ 
regulations in 40 CFR parts 1500 through 1508 are applicable to this 
part.

Sec. 58.11  Legal capacity and performance.

    (a) A responsible entity which believes that it does not have the 
legal capacity to carry out the environmental responsibilities required 
by this part must contact the appropriate local HUD Office or the State 
for further instructions. Determinations of legal capacity will be made 
on a case-by-case basis.
    (b) If a public housing, Indian housing, special project or self-
help homeownership opportunity recipient objects to the non-recipient 
responsible entity conducting the environmental review on the basis of 
performance, timing, or compatibility of objectives, HUD will review 
the facts to determine who will perform the environmental review.
    (c) At any time, HUD may reject the use of a responsible entity to 
conduct the environmental review in a particular case on the basis of 
performance, timing or compatibility of objectives, or in accordance 
with Sec. 58.77(d)(1).
    (d) If a responsible entity, other than a recipient, objects to 
performing an environmental review, or if HUD determines that the 
responsible entity should not perform the environmental review, HUD may 
designate another responsible entity to conduct the review

[[Page 19126]]

in accordance with this part or may itself conduct the environmental 
review in accordance with the provisions of 24 CFR part 50.

Sec. 58.12  Technical and administrative capacity.

    The responsible entity must develop the technical and 
administrative capability necessary to comply with 40 CFR parts 1500 
through 1508 and the requirements of this part.

Sec. 58.13  Responsibilities of the certifying officer.

    Under the terms of the certification required by Sec. 58.71, a 
responsible entity's certifying officer is the ``responsible Federal 
official'' as that term is used in section 102 of NEPA and in statutory 
provisions cited in Sec. 58.1(b). The Certifying Officer is therefore 
responsible for all the requirements of section 102 of NEPA and the 
related provisions in 40 CFR parts 1500 through 1508, and 24 CFR part 
58, including the related Federal authorities listed in Sec. 58.5. The 
Certifying Officer must also:
    (a) Represent the responsible entity and be subject to the 
jurisdiction of the Federal courts. The Certifying Officer will not be 
represented by the Department of Justice in court; and
    (b) Ensure that the responsible entity reviews and comments on all 
EISs prepared for Federal projects that may have an impact on the 
recipient's program.

Sec. 58.14  Interaction with State, Federal and non-Federal entities.

    A responsible entity shall consult, as appropriate, environmental 
agencies, State, Federal and non-Federal entities and the public in the 
preparation of an EIS, EA or other environmental reviews undertaken 
under the related laws and authorities cited in Sec. 58.5 and 
Sec. 58.6. The responsible entity must also cooperate with other 
agencies to reduce duplication between NEPA and comparable 
environmental review requirements of the State (see 40 CFR 1506.2(b) 
and (c)). The responsible entity must prepare its EAs and EISs so that 
they comply with the environmental review requirements of both Federal 
and State laws unless otherwise specified or provided by law. State, 
Federal and local agencies may participate or act in a joint lead or 
cooperating agency capacity in the preparation of joint EISs (see 40 
CFR 1501.5(b) and 1501.6). A single EIS may be prepared and adopted by 
multiple users to the extent that the review addresses the relevant 
environmental issues and there is a written agreement between the 
cooperating agencies which sets forth the coordinated and overall 
responsibilities.

Sec. 58.15  Tiering.

    Responsible entities may tier their environmental reviews and 
assessments to eliminate repetitive discussions of the same issues at 
subsequent levels of review. Tiering is appropriate when there is a 
requirement to evaluate a policy or proposal in the early stages of 
development or when site-specific analysis or mitigation is not 
currently feasible and a more narrow or focused analysis is better done 
at a later date. The site specific review need only reference or 
summarize the issues addressed in the broader review. The broader 
review should identify and evaluate those issues ripe for decision and 
exclude those issues not relevant to the policy, program or project 
under consideration. The broader review should also establish the 
policy, standard or process to be followed in the site specific review. 
The Finding of No Significant Impact (FONSI) with respect to the 
broader assessment shall include a summary of the assessment and 
identify the significant issues to be considered in site specific 
reviews. Subsequent site-specific reviews will not require notices or a 
Request for Release of Funds unless the Certifying Officer determines 
that there are unanticipated impacts or impacts not adequately 
addressed in the prior review. A tiering approach can be used for 
meeting environmental review requirements in areas designated for 
special focus in local Consolidated Plans. Local and State Governments 
are encouraged to use the Consolidated Plan process to facilitate 
environmental reviews.

Sec. 58.17  Historic Preservation requirements for prior section 17 
grants.

    A recipient of a section 17 grant shall comply with the historic 
preservation requirements of this part and existing grant agreements.

Sec. 58.18  Responsibilities of States Assuming HUD Responsibilities.

    (a) States that elect to administer a HUD program shall ensure that 
the program complies with the provisions of this part. The State must:
    (1) Designate the State agency or agencies which will be 
responsible for carrying out the requirements and administrative 
responsibilities set forth in subpart H of this part and which will:
    (i) Develop a monitoring and enforcement program for post-review 
actions on environmental reviews and monitor compliance with any 
environmental conditions included in the award.
    (ii) Receive public notices, RROFs and certifications from 
recipients pursuant to Secs. 58.70 and 58.71; accept objections from 
the public and from other agencies (Sec. 58.73); and perform other 
related responsibilities regarding releases of funds.
    (2) Fulfill the State role in subpart H relative to the time period 
set for the receipt and disposition of comments, objections and appeals 
(if any) on particular projects.
    (b) States administering section 17 Programs shall assume the 
responsibilities set forth in this section for overseeing the State 
recipient's performance and compliance with NEPA and related Federal 
authorities as set forth in this part, including receiving RROFs and 
environmental certifications for particular projects from State 
recipients and objections from government agencies and the public in 
accordance with the procedures contained in subpart H of this part. The 
State shall forward to the responsible HUD Field Office the 
environmental certification, the RROF and any objections received, and 
shall recommend whether to approve or disapprove the certification and 
RROF.

Subpart C--General Policy: Environmental Review Procedures

Sec. 58.21  Time periods.

    All time periods in this part shall be counted in calendar days. 
The first day of a time period begins at 12:01 a.m. local time on the 
day following the publication or the mailing and posting date of the 
notice which initiates the time period.

Sec. 58.22  Limitations on activities pending clearance.

    (a) A recipient may not commit HUD assistance funds under a program 
listed in Sec. 58.1(b) on an activity or project until HUD or the State 
has approved the recipient's RROF and the related certification of the 
responsible entity. In addition, until the RROF and related 
certification has been approved, the recipient may not commit non-HUD 
funds on an activity or project under a program listed in Sec. 58.1(b) 
if the activity or project would have an adverse environmental impact 
or limit the choice of reasonable alternatives. If an activity is 
exempt under Sec. 58.34, or not subject to Sec. 58.5 under 
Sec. 58.35(b), no RROF is required and a recipient may undertake the 
activity immediately after the award of the assistance.
    (b) An option agreement on a proposed site or property is allowable 
prior to the completion of the environmental review if the option

[[Page 19127]]

agreement is subject to a determination by the recipient on the 
desirability of the property for the project as a result of the 
completion of the environmental review in accordance with this part and 
the cost of the option is a nominal portion of the purchase price. 
There is no constraint on the purchase of an option by third parties 
that have not been selected for HUD funding, have no responsibility for 
the environmental review and have no say in the approval or disapproval 
of the project.
    (c) Relocation. Funds may be committed for relocation assistance 
before the approval of the RROF and related certification for the 
project provided that the relocation assistance is required by 24 CFR 
part 42.

Sec. 58.23  Financial assistance for environmental review.

    The costs of environmental reviews, including costs incurred in 
complying with any of the related laws and authorities cited in 
Sec. 58.5 and Sec. 58.6, are eligible costs to the extent allowable 
under the HUD assistance program regulations.

Subpart D--Environmental Review Process: Documentation, Range of 
Activities, Project Aggregation and Classification

Sec. 58.30  Environmental Review Process.

    (a) The environmental review process consists of all the actions 
that a responsible entity must take to determine compliance with this 
part. The environmental review process includes all the compliance 
actions needed for other activities and projects that are not assisted 
by HUD but are aggregated by the responsible entity in accordance with 
Sec. 58.32.
    (b) The environmental review process should begin as soon as a 
recipient determines the projected use of HUD assistance.

Sec. 58.32  Project aggregation.

    (a) A responsible entity must group together and evaluate as a 
single project all individual activities which are related either on a 
geographical or functional basis, or are logical parts of a composite 
of contemplated actions.
    (b) In deciding the most appropriate basis for aggregation when 
evaluating activities under more than one program, the responsible 
entity may choose: functional aggregation when a specific type of 
activity (e.g., water improvements) is to take place in several 
separate locales or jurisdictions; geographic aggregation when a mix of 
dissimilar but related activities is to be concentrated in a fairly 
specific project area (e.g., a combination of water, sewer and street 
improvements and economic development activities); or a combination of 
aggregation approaches, which, for various project locations, considers 
the impacts arising from each functional activity and its 
interrelationship with other activities.
    (c) The purpose of project aggregation is to group together related 
activities so that the responsible entity can:
    (1) Address adequately and analyze, in a single environmental 
review, the separate and combined impacts of activities that are 
similar, connected and closely related, or that are dependent upon 
other activities and actions. (See 40 CFR 1508.25(a)).
    (2) Consider reasonable alternative courses of action.
    (3) Schedule the activities to resolve conflicts or mitigate the 
individual, combined and/or cumulative effects.
    (4) Prescribe mitigation measures and safeguards including project 
alternatives and modifications to individual activities.
    (d) Multi-year project aggregation. (1) Release of funds. When a 
recipient's planning and program development provide for activities to 
be implemented over two or more years, the responsible entity's 
environmental review should consider the relationship among all 
component activities of the multi-year project regardless of the source 
of funds and address and evaluate their cumulative environmental 
effects. The estimated range of the aggregated activities and the 
estimated cost of the total project must be listed and described by the 
responsible entity in the environmental review and included in the 
RROF. The release of funds will cover the entire project period.
    (2) When one or more of the conditions described in Sec. 58.47 
exists, the recipient or other responsible entity must re-evaluate the 
environmental review.

Sec. 58.33  Emergencies.

    (a) In the cases of emergency, disaster or imminent threat to 
health and safety which warrant the taking of an action with 
significant environmental impact, the provisions of 40 CFR 1506.11 
shall apply.
    (b) If funds are needed on an emergency basis and when adherence to 
separate comment periods would prevent the giving of assistance, the 
combined Notice of FONSI and the Notice of the Intent to Request 
Release of Funds may be disseminated and/or published simultaneously 
with the submission of the Request for Release of Funds (RROF). The 
combined Notice of FONSI and NOI/ROF shall state that the funds are 
needed on an immediate emergency basis due to a Presidentially declared 
disaster and that the comment periods have been combined. The Notice 
shall also invite commenters to submit their comments to both HUD and 
the responsible entity issuing the notice to assure that these comments 
will receive full consideration.

Sec. 58.34  Exempt activities.

    (a) Except for the applicable requirements of Sec. 58.6, the 
responsible entity does not have to comply with the requirements of 
this part or undertake any environmental review, consultation or other 
action under NEPA and the other provisions of law or authorities cited 
in Sec. 58.5 for the activities exempt by this section or projects 
consisting solely of the following exempt activities:
    (1) Environmental and other studies, resource identification and 
the development of plans and strategies;
    (2) Information and financial services;
    (3) Administrative and management activities;
    (4) Public services that will not have a physical impact or result 
in any physical changes, including but not limited to services 
concerned with employment, crime prevention, child care, health, drug 
abuse, education, counseling, energy conservation and welfare or 
recreational needs;
    (5) Inspections and testing of properties for hazards or defects;
    (6) Purchase of insurance;
    (7) Purchase of tools;
    (8) Engineering or design costs;
    (9) Technical assistance and training;
    (10) Assistance for temporary or permanent improvements that do not 
alter environmental conditions and are limited to protection, repair or 
restoration activities necessary only to control or arrest the effects 
from disasters, imminent threats or physical deterioration;
    (11) Payment of principal and interest on loans made or obligations 
guaranteed by HUD;
    (12) Any of the categorical exclusions listed in Sec. 58.35(a) 
provided that there are no circumstances which require compliance with 
any other Federal laws and authorities cited in Sec. 58.5.
    (b) A recipient does not have to submit an RROF and certification, 
and no further approval from HUD or the State will be needed by the 
recipient for the drawdown of funds to carry out exempt activities and 
projects. However, the responsible entity must document in writing its 
determination that each activity or project is exempt and meets the 
conditions specified for such exemption under this section.

[[Page 19128]]

Sec. 58.35  Categorical exclusions.

    Categorical exclusion refers to a category of activities for which 
no environmental impact statement or environmental assessment and 
finding of no significant impact under NEPA is required, except in 
extraordinary circumstances (see Sec. 58.2(a)(3)) in which a normally 
excluded activity may have a significant impact. Compliance with the 
other applicable Federal environmental laws and authorities listed in 
Sec. 58.5 is required for any categorical exclusion listed in paragraph 
(a) of this section.
    (a) Categorical exclusions subject to Sec. 58.5. The following 
activities are categorically excluded under NEPA, but may be subject to 
review under authorities listed in Sec. 58.5:
    (1) Acquisition, repair, improvement, reconstruction, or 
rehabilitation of public facilities and improvements (other than 
buildings) when the facilities and improvements are in place and will 
be retained in the same use without change in size or capacity of more 
than 20 percent (e.g., replacement of water or sewer lines, 
reconstruction of curbs and sidewalks, repaving of streets).
    (2) Special projects directed to the removal of material and 
architectural barriers that restrict the mobility of and accessibility 
to elderly and handicapped persons.
    (3) Rehabilitation of buildings and improvements when the following 
conditions are met:
    (i) In the case of multifamily residential buildings:
    (A) Unit density is not changed more than 20 percent;
    (B) The project does not involve changes in land use from 
residential to non-residential; and
    (C) The estimated cost of rehabilitation is less than 75 percent of 
the total estimated cost of replacement after rehabilitation.
    (ii) In the case of non-residential structures, including 
commercial, industrial, and public buildings:
    (A) The facilities and improvements are in place and will not be 
changed in size or capacity by more than 20 percent; and
    (B) The activity does not involve a change in land use, such as 
from non-residential to residential, commercial to industrial, or from 
one industrial use to another.
    (4) An individual action on a one- to four-family dwelling or an 
individual action on a project of five or more units developed on 
scattered sites when the sites are more than 2,000 feet apart and there 
are not more than four units on any one site.
    (5) Acquisition or disposition of an existing structure or 
acquisition of vacant land provided that the structure or land acquired 
or disposed of will be retained for the same use.
    (6) Combinations of the above activities.
    (b) Categorical exclusions not subject to Sec. 58.5. The Department 
has determined that the following categorically excluded activities 
would not alter any conditions that would require a review or 
compliance determination under the Federal laws and authorities cited 
in Sec. 58.5. When the following kinds of activities are undertaken, 
the responsible entity does not have to publish a NOI/RROF or execute a 
certification and the recipient does not have to submit a RROF to HUD 
(or the State) except in the circumstances described in paragraph (c) 
of this section. Following the award of the assistance, no further 
approval from HUD or the State will be needed with respect to 
environmental requirements, except where paragraph (c) of this section 
applies. The recipient remains responsible for carrying out any 
applicable requirements under Sec. 58.6.
    (1) Tenant-based rental assistance;
    (2) Supportive services including, but not limited to, health care, 
housing services, permanent housing placement, day care, nutritional 
services, short-term payments for rent/mortgage/utility costs, and 
assistance in gaining access to local, State, and Federal government 
benefits and services;
    (3) Operating costs including maintenance, security, operation, 
utilities, furnishings, equipment, supplies, staff training and 
recruitment and other incidental costs;
    (4) Economic development activities, including but not limited to, 
equipment purchase, inventory financing, interest subsidy, operating 
expenses and similar costs not associated with construction or 
expansion of existing operations;
    (5) Activities to assist homeownership of existing ``or new 
dwelling units not assisted with Federal funds'' including closing 
costs and down payment assistance to home buyers, interest buydowns and 
similar activities that result in the transfer of title to a property;
    (6) Affordable housing pre-development costs including legal, 
consulting, developer and other costs related to obtaining site 
options, project financing, administrative costs and fees for loan 
commitments, zoning approvals, and other related activities which do 
not have a physical impact.
    (c) Circumstances requiring NEPA review. If a responsible entity 
determines that an activity or project identified in paragraph (a) or 
(b) of this section, because of extraordinary circumstances and 
conditions at or affecting the location of the activity or project, may 
have a significant environmental effect, it shall comply with all the 
requirements of this part.
    (d) The Environmental Review Record (ERR) must contain a well 
organized written record of the process and determinations made under 
this section.

Sec. 58.36  Environmental assessments.

    If a project is not exempt or categorically excluded under 
Secs. 58.34 and 58.35, the responsible entity must prepare an EA in 
accordance with subpart E of this part. If it is evident without 
preparing an EA that an EIS is required under Sec. 58.37, the 
responsible entity should proceed directly to an EIS.

Sec. 58.37  Environmental impact statement determinations.

    (a) An EIS is required when the project is determined to have a 
potentially significant impact on the human environment.
    (b) An EIS is required under any of the following circumstances, 
except as provided in paragraph (c) of this section:
    (1) The project would provide a site or sites for, or result in the 
construction of, hospitals or nursing homes containing a total of 2,500 
or more beds.
    (2) The project would remove, demolish, convert or substantially 
rehabilitate 2,500 or more existing housing units (but not including 
rehabilitation projects categorically excluded under Sec. 58.35), or 
would result in the construction or installation of 2,500 or more 
housing units, or would provide sites for 2,500 or more housing units.
    (3) The project would provide enough additional water and sewer 
capacity to support 2,500 or more additional housing units. The project 
does not have to be specifically intended for residential use nor does 
it have to be totally new construction. If the project is designed to 
provide upgraded service to existing development as well as to serve 
new development, only that portion of the increased capacity which is 
intended to serve new development should be counted.
    (c) If, on the basis of an EA, a responsible entity determines that 
the thresholds in paragraph (b) of this section are the sole reason for 
the EIS, the responsible entity may prepare a FONSI pursuant to 40 CFR 
1501.4. In such cases, the FONSI must be made available for public 
review for at least 30 days before the responsible entity

[[Page 19129]]

makes the final determination whether to prepare an EIS.
    (d) Notwithstanding paragraphs (a) through (c) of this section, an 
EIS is not required where Sec. 58.53 is applicable.
    (e) Recommended EIS Format. The responsible entity must use the EIS 
format recommended by the CEQ regulations (40 CFR 1502.10) unless a 
determination is made on a particular project that there is a 
compelling reason to do otherwise. In such a case, the EIS format must 
meet the minimum requirements prescribed in 40 CFR 1502.10.

Sec. 58.38  Environmental review record.

    The responsible entity must maintain a written record of the 
environmental review undertaken under this part for each project. This 
document will be designated the ``Environmental Review Record'' (ERR), 
and shall be available for public review. The responsible entity must 
use the current HUD-recommended formats or develop equivalent formats.
    (a) ERR Documents. The ERR shall contain all the environmental 
review documents, public notices and written determinations or 
environmental findings required by this part as evidence of review, 
decisionmaking and actions pertaining to a particular project of a 
recipient. The document shall:
    (1) Describe the project and the activities that the recipient has 
determined to be part of the project;
    (2) Evaluate the effects of the project or the activities on the 
human environment;
    (3) Document compliance with applicable statutes and authorities, 
in particular those cited in Sec. 58.5 and 58.6; and
    (4) Record the written determinations and other review findings 
required by this part (e.g., exempt and categorically excluded projects 
determinations, findings of no significant impact).
    (b) Other documents and information. The ERR shall also contain 
verifiable source documents and relevant base data used or cited in 
EAs, EISs or other project review documents. These documents may be 
incorporated by reference into the ERR provided that each source 
document is identified and available for inspection by interested 
parties. Proprietary material and special studies prepared for the 
recipient that are not otherwise generally available for public review 
shall not be incorporated by reference but shall be included in the 
ERR.

Subpart E--Environmental Review Process: Environmental Assessments 
(EA's)

Sec. 58.40  Preparing the environmental assessment.

    The responsible entity may prepare the EA using the HUD recommended 
format. In preparing an EA for a particular project, the responsible 
entity must:
    (a) Determine existing conditions and describe the character, 
features and resources of the project area and its surroundings; 
identify the trends that are likely to continue in the absence of the 
project.
    (b) Identify all potential environmental impacts, whether 
beneficial or adverse, and the conditions that would change as a result 
of the project.
    (c) Identify, analyze and evaluate all impacts to determine the 
significance of their effects on the human environment and whether the 
project will require further compliance under related laws and 
authorities cited in Sec. 58.5 and Sec. 58.6.
    (d) Examine and recommend feasible ways in which the project or 
external factors relating to the project could be modified in order to 
eliminate or minimize adverse environmental impacts.
    (e) Examine alternatives to the project itself, if appropriate, 
including the alternative of no action.
    (f) Complete all environmental review requirements necessary for 
the project's compliance with applicable authorities cited in 
Secs. 58.5 and 58.6.
    (g) Based on steps set forth in paragraph (a) through (f) of this 
section, make one of the following findings:
    (1) A Finding of No Significant Impact (FONSI), in which the 
responsible entity determines that the project is not an action that 
will result in a significant impact on the quality of the human 
environment. The responsible entity may then proceed to Sec. 58.43.
    (2) A finding of significant impact, in which the project is deemed 
to be an action which may significantly affect the quality of the human 
environment. The responsible entity must then proceed with its 
environmental review under subpart F or G of this part.

Sec. 58.43  Dissemination and/or publication of the findings of no 
significant impact.

    (a) If the responsible entity makes a finding of no significant 
impact, it must prepare a FONSI notice, using the current HUD-
recommended format or an equivalent format. As a minimum, the 
responsible entity must send the FONSI notice to individuals and groups 
known to be interested in the activities, to the local news media, to 
the appropriate tribal, local, State and Federal agencies; to the 
Regional Offices of the Environmental Protection Agency having 
jurisdiction and to the HUD Field Office (or the State where 
applicable). The responsible entity may also publish the FONSI notice 
in a newspaper of general circulation in the affected community. If the 
notice is not published, it must also be prominently displayed in 
public buildings, such as the local Post Office and within the project 
area or in accordance with procedures established as part of the 
citizen participation process.
    (b) The responsible entity may disseminate or publish a FONSI 
notice at the same time it disseminates or publishes the NOI/RROF 
required by Sec. 58.70. If the notices are released as a combined 
notice, the combined notice shall:
    (1) Clearly indicate that it is intended to meet two separate 
procedural requirements; and
    (2) Advise the public to specify in their comments which ``notice'' 
their comments address.
    (c) The responsible entity must consider the comments and make 
modifications, if appropriate, in response to the comments, before it 
completes its environmental certification and before the recipient 
submits its RROF. If funds will be used in Presidentially declared 
disaster areas, modifications resulting from public comment, if 
appropriate, must be made before proceeding with the expenditure of 
funds.

Sec. 58.45  Public comment periods.

    (a) Notice of finding of no significant impact: 15 days from date 
of publication or if no publication, 18 days from the date of mailing 
and posting.
    (b) Notice of intent to request release of funds: 7 days from date 
of publication or if no publication, 10 days from date of mailing and 
posting.
    (c) Concurrent or combined notices: Same as FONSI notice.

Sec. 58.46  Time delays for exceptional circumstances.

    The responsible entity must make the FONSI available for public 
comments for 30 days before the recipient files the RROF when:
    (a) There is a considerable interest or controversy concerning the 
project;
    (b) The proposed project is similar to other projects that normally 
require the preparation of an EIS; or
    (c) The project is unique and without precedent.

[[Page 19130]]

Sec. 58.47  Re-evaluation of environmental assessments and other 
environmental findings.

    (a) A responsible entity must re-evaluate its environmental 
findings when:
    (1) The recipient proposes substantial changes in the nature, 
magnitude or extent of the project, including adding new activities not 
anticipated in the original scope of the project;
    (2) There are new circumstances and environmental conditions which 
may affect the project or have a bearing on its impact, such as 
concealed or unexpected conditions discovered during the implementation 
of the project or activity which is proposed to be continued; or
    (3) The recipient proposes the selection of an alternative not in 
the original finding.
    (b) The purpose of the responsible entity's re-evaluation is to 
determine if the original findings are still valid. If the original 
findings are still valid but the data or conditions upon which they 
were based have changed, the responsible entity must amend the original 
findings and update its ERR by including this re-evaluation and its 
determination based on its findings. If the responsible entity 
determines that the original findings are no longer valid, it must 
prepare an EA or an EIS if its evaluation indicates potentially 
significant impacts. Where the recipient is not the responsible entity, 
the recipient must inform the responsible entity promptly of any 
proposed substantial changes under paragraph (a)(1) of this section, 
new circumstances or environmental conditions under paragraph (a)(2) of 
this section, or any proposals to select a different alternative under 
paragraph (a)(3) of this section, and must then permit the responsible 
entity to re-evaluate the findings before proceeding.

Subpart F--Environmental Review Process: Environmental Impact 
Statement Determinations

Sec. 58.52  Adoption of other agencies' EISs.

    The responsible entity may adopt a draft or final EIS prepared by 
another agency provided that the EIS was prepared in accordance with 40 
CFR parts 1500 through 1508. If the responsible entity adopts an EIS 
prepared by another
FR Doc. 96-10467 Office of the Secretary; Environmental Review Procedures for Entities Assuming HUD Environmental Responsibilities
 agency, the procedure in 40 CFR 1506.3 shall be 
followed. An adopted EIS may have to be revised and modified to adapt 
it to the particular environmental conditions and circumstances of the 
project if these are different from the project reviewed in the EIS. In 
such cases the responsible entity must prepare, circulate, and file a 
supplemental draft EIS in the manner prescribed in Sec. 58.60(d) and 
otherwise comply with the clearance and time requirements of the EIS 
process, except that scoping requirements under 40 CFR 1501.7 shall not 
apply. The agency that prepared the original EIS should be informed 
that the responsible entity intends to amend and adopt the EIS. The 
responsible entity may adopt an EIS when it acts as a cooperating 
agency in its preparation under 40 CFR 1506.3. The responsible entity 
is not required to re-circulate or file the EIS, but must complete the 
clearance process for the RROF. The decision to adopt an EIS shall be 
made a part of the project ERR.

Sec. 58.53  Use of prior environmental impact statements.

    Where any final EIS has been listed in the Federal Register for a 
project pursuant to this part, or where an areawide or similar broad 
scale final EIS has been issued and the EIS anticipated a subsequent 
project requiring an environmental clearance, then no new EIS is 
required for the subsequent project if all the following conditions are 
met:
    (a) The ERR contains a decision based on a finding pursuant to 
Sec. 58.40 that the proposed project is not a new major Federal action 
significantly affecting the quality of the human environment. The 
decision shall include:
    (1) References to the prior EIS and its evaluation of the 
environmental factors affecting the proposed subsequent action subject 
to NEPA;
    (2) An evaluation of any environmental factors which may not have 
been previously assessed, or which may have significantly changed;
    (3) An analysis showing that the proposed project is consistent 
with the location, use, and density assumptions for the site and with 
the timing and capacity of the circulation, utility, and other 
supporting infrastructure assumptions in the prior EIS;
    (4) Documentation showing that where the previous EIS called for 
mitigating measures or other corrective action, these are completed to 
the extent reasonable given the current state of development.
    (b) The prior final EIS has been filed within five (5) years, and 
updated as follows:
    (1) The EIS has been updated to reflect any significant revisions 
made to the assumptions under which the original EIS was prepared;
    (2) The EIS has been updated to reflect new environmental issues 
and data or legislation and implementing regulations which may have 
significant environmental impact on the project area covered by the 
prior EIS.
    (c) There is no litigation pending in connection with the prior 
EIS, and no final judicial finding of inadequacy of the prior EIS has 
been made.

Subpart G--Environmental Review Process: Procedures for Draft, 
Final and Supplemental Environmental Impact Statements

Sec. 58.55  Notice of intent to prepare an EIS.

    As soon as practicable after the responsible entity decides to 
prepare an EIS, it must publish a NOI/EIS, using the HUD recommended 
format and disseminate it in the same manner as required by 40 CFR 
parts 1500 through 1508.

Sec. 58.56  Scoping process.

    The determination on whether or not to hold a scoping meeting will 
depend on the same circumstances and factors as for the holding of 
public hearings under Sec. 58.59. The responsible entity must wait at 
least 15 days after disseminating or publishing the NOI/EIS before 
holding a scoping meeting.

Sec. 58.57  Lead agency designation.

    If there are several agencies ready to assume the lead role, the 
responsible entity must make its decision based on the criteria in 40 
CFR 1501.5(c). If the responsible entity and a Federal agency are 
unable to reach agreement, then the responsible entity must notify HUD 
(or the State, where applicable). HUD (or the State) will assist in 
obtaining a determination based on the procedure set forth in 40 CFR 
1501.5(e).

Sec. 58.59  Public hearings and meetings.

    (a) Factors to consider. In determining whether or not to hold 
public hearings in accordance with 40 CFR 1506.6, the responsible 
entity must consider the following factors:
    (1) The magnitude of the project in terms of economic costs, the 
geographic area involved, and the uniqueness or size of commitment of 
resources involved.
    (2) The degree of interest in or controversy concerning the 
project.
    (3) The complexity of the issues and the likelihood that 
information will be presented at the hearing which will be of 
assistance to the responsible entity.
    (4) The extent to which public involvement has been achieved 
through other means.
    (b) Procedure. All public hearings must be preceded by a notice of 
public hearing, which must be published in the local news media 15 days 
before the hearing date. The Notice must:

[[Page 19131]]

    (1) State the date, time, place, and purpose of the hearing or 
meeting.
    (2) Describe the project, its estimated costs, and the project 
area.
    (3) State that persons desiring to be heard on environmental issues 
will be afforded the opportunity to be heard.
    (4) State the responsible entity's name and address and the name 
and address of its Certifying Officer.
    (5) State what documents are available, where they can be obtained, 
and any charges that may apply.

Sec. 58.60  Preparation and filing of environmental impact statements.

    (a) The responsible entity must prepare the draft environmental 
impact statement (DEIS) and the final environmental impact statements 
(FEIS) using the current HUD recommended format or its equivalent.
    (b) The responsible entity must file and distribute the (DEIS) and 
the (FEIS) in the following manner:
    (1) Five copies to EPA Headquarters;
    (2) Five copies to EPA Regional Office;
    (3) Copies made available in the responsible entity's and the 
recipient's office;
    (4) Copies or summaries made available to persons who request them; 
and
    (5) FEIS only--one copy to State, HUD Field Office, and HUD 
Headquarters library.
    (c) The responsible entity may request waivers from the time 
requirements specified for the draft and final EIS as prescribed in 40 
CFR 1506.6.
    (d) When substantial changes are proposed in a project or when 
significant new circumstances or information becomes available during 
an environmental review, the recipient may prepare a supplemental EIS 
as prescribed in 40 CFR 1502.9.
    (e) The responsible entity must prepare a Record of Decision (ROD) 
as prescribed in 40 CFR 1502.2.

Subpart H--Release of Funds for Particular Projects

Sec. 58.70  Notice of intent to request release of funds.

    The NOI/RROF must be disseminated and/or published in the manner 
prescribed by Sec. 58.43 and Sec. 58.45 before the certification is 
signed by the responsible entity.

Sec. 58.71  Request for release of funds and certification.

    (a) The RROF and certification shall be sent to the appropriate HUD 
Field Office (or the State, if applicable), except as provided in 
paragraph (b) of this section. This request shall be executed by the 
Certifying Officer. The request shall describe the specific project and 
activities covered by the request and contain the certification 
required under the applicable statute cited in Sec. 58.1(b). The RROF 
and certification must be in a form specified by HUD.
    (b) When the responsible entity is conducting an environmental 
review on behalf of a recipient, as provided for in Sec. 58.10, the 
recipient must provide the responsible entity with all available 
project and environmental information and refrain from undertaking any 
physical activities or choice limiting actions until HUD (or the State, 
if applicable) has approved its request for release of funds. The 
certification form executed by the responsible entity's certifying 
officer shall be sent to the recipient that is to receive the 
assistance along with a description of any special environmental 
conditions that must be adhered to in carrying out the project. The 
recipient is to submit the RROF and the certification of the 
responsible entity to HUD (or the State, if applicable) requesting the 
release of funds. The recipient must agree to abide by the special 
conditions, procedures and requirements of the environmental review, 
and to advise the responsible entity of any proposed change in the 
scope of the project or any change in environmental conditions.
    (c) If the responsible entity determines that some of the 
activities are exempt under applicable provisions of this part, the 
responsible entity shall advise the recipient that it may commit funds 
for these activities as soon as programmatic authorization is received. 
This finding shall be documented in the ERR maintained by the 
responsible entity and in the recipient's project files.

Sec. 58.72  HUD or State Actions on RROFs and certifications.

    The actions which HUD (or a State) may take with respect to a 
recipient's environmental certification and RROF are as follows:
    (a) In the absence of any receipt of objection to the contrary, 
except as provided in paragraph (b) of this section, HUD (or the State) 
will assume the validity of the certification and RROF and will approve 
these documents after expiration of the 15-day period prescribed by 
statute.
    (b) HUD (or the State) may disapprove a certification and RROF if 
it has knowledge that the responsible entity has not complied with the 
items in Sec. 58.75, or that the RROF and certification are inaccurate.
    (c) In cases in which HUD has approved a certification and RROF but 
subsequently learns (e.g., through monitoring) that the recipient 
violated Sec. 58.22 or the recipient or responsible entity otherwise 
failed to comply with a clearly applicable environmental authority, HUD 
shall impose appropriate remedies and sanctions in accord with the law 
and regulations for the program under which the violation was found.

Sec. 58.73  Objections to release of funds.

    HUD (or the State) will not approve the ROF for any project before 
15 calendar days have elapsed from the time of receipt of the RROF and 
the certification or from the time specified in the notice published 
pursuant to Sec. 58.70, whichever is later. Any person or agency may 
object to a recipient's RROF and the related certification. However, 
the objections must meet the conditions and procedures set forth in 
subpart H of this part. HUD (or the State) can refuse the RROF and 
certification on any grounds set forth in Sec. 58.75. All decisions by 
HUD (or the State) regarding the RROF and the certification shall be 
final.

Sec. 58.74  Time for objecting.

    All objections must be received by HUD (or the State) within 15 
days from the time HUD (or the State) receives the recipient's RROF and 
the related certification, or within the time period specified in the 
notice, whichever is later.

Sec. 58.75  Permissible bases for objections.

    HUD (or the State), will consider objections claiming a responsible 
entity's noncompliance with this part based only on any of the 
following grounds:
    (a) The certification was not in fact executed by the responsible 
entity's Certifying Officer.
    (b) The responsible entity has failed to make one of the two 
findings pursuant to Sec. 58.40 or to make the written determination 
required by Secs. 58.35, 58.47 or 58.53 for the project, as applicable.
    (c) The responsible entity has omitted one or more of the steps set 
forth at subpart E of this part for the preparation, publication and 
completion of an EA.
    (d) The responsible entity has omitted one or more of the steps set 
forth at subparts F and G of this part for the conduct, preparation, 
publication and completion of an EIS.
    (e) The recipient has committed funds or incurred costs not 
authorized by this part before release of funds and approval of the 
environmental certification by HUD or the State.

[[Page 19132]]

    (f) Another Federal agency acting pursuant to 40 CFR part 1504 has 
submitted a written finding that the project is unsatisfactory from the 
standpoint of environmental quality.

Sec. 58.76  Procedure for objections.

    A person or agency objecting to a responsible entity's RROF and 
certification shall submit objections in writing to HUD (or the State). 
The objections shall:
    (a) Include the name, address and telephone number of the person or 
agency submitting the objection, and be signed by the person or 
authorized official of an agency.
    (b) Be dated when signed.
    (c) Describe the basis for objection and the facts or legal 
authority supporting the objection.
    (d) State when a copy of the objection was mailed or delivered to 
the responsible entity's Certifying Officer.

Sec. 58.77  Effect of approval of certification.

    (a) Responsibilities of HUD and States. HUD's (or, where 
applicable, the State's) approval of the certification shall be deemed 
to satisfy the responsibilities of the Secretary under NEPA and related 
provisions of law cited at Sec. 58.5 insofar as those responsibilities 
relate to the release of funds as authorized by the applicable 
provisions of law cited in Sec. 58.1(b).
    (b) Public and agency redress. Persons and agencies seeking redress 
in relation to environmental reviews covered by an approved 
certification shall deal with the responsible entity and not with HUD. 
It is HUD's policy to refer all inquiries and complaints to the 
responsible entity and its Certifying Officer. Similarly, the State 
(where applicable) may direct persons and agencies seeking redress in 
relation to environmental reviews covered by an approved certification 
to deal with the responsible entity, and not the State, and may refer 
inquiries and complaints to the responsible entity and its Certifying 
Officer. Remedies for noncompliance are set forth in program 
regulations.
    (c) Implementation of environmental review decisions. Projects of a 
recipient will require post-review monitoring and other inspection and 
enforcement actions by the recipient and the State or HUD (using 
procedures provided for in program regulations) to assure that 
decisions adopted through the environmental review process are carried 
out during project development and implementation.
    (d) Responsibility for monitoring and training. (1) At least once 
every three years, HUD intends to conduct in-depth monitoring and 
exercise quality control (through training and consultation) over the 
environmental activities performed by responsible entities under this 
part. Limited monitoring of these environmental activities will be 
conducted during each program monitoring site visit. If through limited 
or in-depth monitoring of these environmental activities or by other 
means, HUD becomes aware of any environmental deficiencies, HUD may 
take one or more of the following actions:
    (i) In the case of problems found during limited monitoring, HUD 
may schedule in-depth monitoring at an earlier date or may schedule in-
depth monitoring more frequently;
    (ii) HUD may require attendance by staff of the responsible entity 
at HUD-sponsored or approved training, which will be provided 
periodically at various locations around the country;
    (iii) HUD may refuse to accept the certifications of environmental 
compliance on subsequent grants;
    (iv) HUD may suspend or terminate the responsible entity's 
assumption of the environmental review responsibility;
    (v) HUD may initiate sanctions, corrective actions, or other 
remedies specified in program regulations or agreements or contracts 
with the recipient.
    (2) HUD's responsibilities and action under paragraph (d)(1) of 
this section shall not be construed to limit or reduce any 
responsibility assumed by a responsible entity with respect to any 
particular release of funds under this part. Whether or not HUD takes 
action under paragraph (d)(1) of this section, the Certifying Officer 
remains the responsible Federal official under Sec. 58.13 with respect 
to projects and activities for which the Certifying Officer has 
submitted a certification under this part.

    Dated: March 27, 1996.
Henry G. Cisneros,
Secretary.
[FR Doc. 96-10467 Filed 4-29-96; 8:45 am]
BILLING CODE 4210-29-P

Complete official Federal Register PDF

FR Doc. 96-10173 Telecommunications Act of 1996
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Pages 18968-18981]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10173]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 76

[CS Docket No. 96-85, FCC 96-154]

Telecommunications Act of 1996

AGENCY: Federal Communications Commission.

ACTION: Interim and final rules.

-----------------------------------------------------------------------

SUMMARY: This Order implements sections of the Telecommunications Act 
of 1996 (``1996 Act''). The Order establishes rules conforming the 
Commission's rules to statutory mandates that became effective upon 
enactment of the 1996 Act. Although all rules promulgated pursuant to 
this Order are ``final,'' the Commission recognizes that some rules, 
apart from those implementing the explicit language of the 1996 Act, 
should be viewed as ``interim'' rules subject to revision in the near 
future based on comments and information received in an associated 
Notice of Proposed Rulemaking (``NPRM'') that has been released 
concurrently with this Order and published in this issue of the Federal 
Register. This Order implements rules related to the 1996 Act's cable 
reform provisions, including the definition of effective competition, 
the cable rate complaint process, the sunset of cable programming 
service tier regulation, small cable operators, uniform rate 
requirements, subscriber notice of service and rate changes, technical 
standards, cable system buy out restrictions, program access, the 
definitions of cable system and cable

[[Page 18969]]

service, operator refusals to carry indecent programming, and prior 
year losses. The intended effect of this action is to implement 
provisions of the 1996 Act that revised the Cable Television Consumer 
Protection and Competition Act of 1992.

DATES: The statutory requirements reflected in the final rules adopted 
in this Order were effective February 8, 1996, the date of enactment of 
the Telecommunications Act of 1996. The effective date for the final 
rule changes (47 C.F.R. 76.5 (a) and (ff), 76.309(c)(3)(i)(B), 76.505, 
76.605 Note 6, 76.701, 76.702, 76.905(b)(4), 76.933 (e) and (g)(5), 
76.950, 76.951, 76.953(a), 76.956(a), 76.964, 76.984(c) as established 
herein is April 30, 1996. The effective date of the interim rules (47 
C.F.R. 76.1400-76.1404) is April 30, 1996. Procedures for submitting 
comments can be found in the companion NPRM issued with this Order. The 
companion NPRM can be found elsewhere in this issue of the Federal 
Register.

FOR FURTHER INFORMATION CONTACT:
Tom Power, Paul Glenchur, Nancy Stevenson, Cable Services Bureau, (202) 
416-0800.

SUPPLEMENTARY INFORMATION: This is a synopsis of a Commission Order in 
CS Docket No. 96-85, FCC 96-154, adopted April 5, 1996 and released 
April 9, 1996. The complete text of this document is available for 
inspection and copying during normal business hours in the FCC 
Reference Center, 1919 M St., N.W., Washington, D.C., and also may be 
purchased from the Commission's copy contractor, International 
Transcription Services, Inc. at (202) 857-3800, 2100 M Street, N.W., 
Suite 140, Washington, D.C. 20017.

Synopsis of Order

Table of Contents

                                                                        
                                                              Paragraph 
                                                                        
I. Introduction............................................            1
II. Order..................................................            5
  A. Effective Competition.................................            5
  B. CPST Rate Complaints..................................           16
  C. Small Cable Operators.................................           20
  D. Uniform Rate Requirement..............................           30
  E. Subscriber Notice.....................................           34
  F. Technical Standards...................................           37
  G. Buy Out Prohibitions..................................           40
  H. Program Access........................................           43
  I. Sunset of Upper Tier Rate Regulation..................           46
  J. Definition of ``Cable System''........................           48
  K. Definition of ``Cable Service''.......................           55
  L. Cable Operator Refusal To Carry Certain Programming...           58
III. Regulatory Flexibility Analyses.......................           71
IV. Initial Paperwork Reduction Act of 1995 Analysis.......           75
V. Effective Date..........................................           76
VI. Ordering Clauses.......................................           77
                                                                        

I. Introduction

    1. In this item we amend the Commission's rules relating to cable 
television to conform them to changes in the Communications Act 
enacted, on February 8, 1996, in the Telecommunications Act of 1996 
(the ``1996 Act''). In addition, in an associated Notice of Proposed 
Rulemaking (``NPRM''), we propose further rules to the extent necessary 
to implement various provisions of the 1996 Act. Finally, because many 
of these statutory provisions were effective upon enactment, we 
establish interim rules to govern implementation of the 1996 Act 
pending adoption of final rules.
    2. Our intent in this item is to conform our rules promptly to 
statutory requirements that are already in effect, to bring certainty 
to cable operators and local regulators, and to achieve as quickly as 
possible the deregulation intended by Congress. Further, we seek to 
streamline our procedural regulations and, of course, to continue to 
protect consumers, consistent with congressional intent.
    3. Much of the 1996 Act consists of clear, self-effectuating 
revisions to prior federal statutory provisions. The Order portion of 
this item conforms our rules to meet these new statutory requirements. 
We are revising these rules without providing prior public notice and 
an opportunity for comment because the rule modifications are mandated 
by the applicable provisions of the 1996 Act. We find that notice and 
comment procedures are unnecessary, and that therefore this action 
falls within the ``good cause'' exception of the Administrative 
Procedure Act. 5 U.S.C. Sec. 553(b)(B). The final rules adopted in this 
Order do not involve discretionary action on the part of the 
Commission. Rather, they simply implement provisions of the 1996 Act 
according to the specific terms set forth in the legislation.
    4. Other provisions of the 1996 Act are already effective, but 
require further rulemaking in order to be fully and clearly 
implemented. The companion NPRM addresses these issues. We find it in 
the public interest to adopt interim rules immediately and find good 
cause to establish them without the benefit of the traditional notice 
and comment process. Of course, our final rules will be crafted to take 
into account public comment to the same extent as would be the case in 
a rulemaking that was not preceded by the adoption of interim policies. 
However, we intend the interim rules to create a safe harbor, i.e., 
operators can be assured that if they comply with these interim rules, 
their behavior will not later be subject to challenge based upon the 
ultimate outcome of the rulemaking.

II. Order

A. Effective Competition

1. Final Rule Change
    5. Since passage of the Cable Television Consumer Protection and 
Competition Act of 1992 (the ``1992 Cable Act''), regulation of cable 
television has been guided by Congress' intent to ``rely on the 
marketplace, to the maximum extent feasible . . . .'' The 1992 Cable 
Act required the Commission to prescribe rate regulations that protect 
subscribers from having to pay unreasonable rates by ensuring that 
rates for regulated services do not exceed rates that would be charged 
in the presence of effective competition. Thus, regulations governing 
the rates charged for cable services do not apply to cable systems that 
actually face effective competition. For a system that is not subject 
to effective competition, the Commission is obligated to ensure the 
reasonableness of rates charged for the basic service tier (``BST'') 
and for the cable programming service tier (``CPST''). The BST, which a 
subscriber must purchase in order to have access to any other tier of 
service, must include all of the local broadcast television stations 
that the operator offers over its system, plus any public, educational, 
or government access channels that the operator is required to provide 
to subscribers under the terms of its franchise. A CPST is any tier of 
programming, other than the basic service tier, that a cable operator 
offers. Where effective competition is present, certain other 
regulatory requirements also become inapplicable, including the uniform 
rate requirement, the ``tier buy through'' requirement, and certain of 
the ownership rules.
    6. Section 76.905(b) of our rules incorporates the statutory 
definition of ``effective competition'' as set forth in the 1992 Cable 
Act. Pursuant to that rule, a system is subject to effective 
competition in the area covered by its local franchise if any one of 
the following three tests are met:

[[Page 18970]]

    (1) Fewer than 30 percent of the households in its franchise 
area subscribe to the cable service of a cable system.
    (2) The franchise area is:
    (i) Served by at least two unaffiliated multichannel video 
programming distributors each of which offers comparable programming 
to at least 50 percent of the households in the franchise area; and
    (ii) the number of households subscribing to programming 
services offered by multichannel video programming distributors 
other than the largest multichannel video programming distributor 
exceeds 15% of the households in the franchise area.
    (3) A multichannel video programming distributor, operated by 
the franchising authority for that franchise area, offers video 
programming to at least 50 percent of the households in the 
franchise area.

    7. The three effective competition test categories described above 
are not altered by the 1996 Act. However, Section 301(b)(3) of the 1996 
Act creates a fourth test, finding that effective competition exists 
when video programming is offered by, or over the facilities of, a 
local exchange carrier (``LEC'') or its affiliate. Thus, effective 
competition now exists if a:

    Local exchange carrier or its affiliate (or any multichannel 
video programming distributor using the facilities of such carrier 
or its affiliate) offers video programming services directly to 
subscribers by any means (other than direct-to-home satellite 
services) in the franchise area of an unaffiliated cable operator 
which is providing cable service in that franchise area, but only if 
the video programming services so offered in that area are 
comparable to the video programming services provided by the 
unaffiliated cable operator in that area.

This provision was effective upon enactment. Therefore, we amend our 
rules to incorporate this additional prong of the definition of 
effective competition. Consistent with Section 623 of the statute, we 
seek to adopt interim and permanent rules that will allow the 
Commission to determine when the level of competition provided by a LEC 
or its affiliate is sufficient to have a restraining effect on cable 
rates.
2. Definitions of ``offer'' and ``in the franchise area''
    8.-9. The Commission's pre-existing definition of ``offer'' will 
apply under the new test for effective competition:

    Service of a multichannel video programming distributor will be 
deemed offered: (1) When the multichannel video programming 
distributor is physically able to deliver service to potential 
subscribers, with the addition of no or only minimal additional 
investment by the distributor, in order for an individual subscriber 
to receive service; and (2) When no regulatory, technical or other 
impediments to households taking service exist, and potential 
subscribers in the franchise area are reasonably aware that they may 
purchase the services of the multichannel video programming 
distributor.

    10. The legislative history to the 1996 Act indicates congressional 
intent to apply this definition of ``offer'' for purposes of the new 
test for effective competition.
    11. An operator should focus on each element of the ``offer'' 
definition, in the context of the new test for effective competition, 
when attempting to prove that the service offered by the LEC-affiliated 
multichannel video programming distributor (``MVPD'') is effective in 
restraining cable rates. For example, a cable operator seeking to prove 
effective competition will have to show that the competitor is 
``physically able'' to offer service to subscribers ``in the franchise 
area.'' Where the competitor's service area does not follow the borders 
of the local cable franchise areas, a cable operator should describe 
the extent of the overlap between its franchise area and the actual or 
planned service area of the competitor. With respect to multichannel 
multipoint distribution service (``MMDS''), for example, we previously 
have determined that the potential subscribers include only those who 
reside in ``areas to which the MMDS operator is capable of providing 
video programming.'' We note that the zone in which our rules protect a 
MMDS licensee from harmful electrical interference is a circle with a 
radius of 35 miles centered on the MMDS transmitter site. Thus, in 
seeking to establish effective competition from a LEC-affiliated MMDS 
operator, a cable operator should provide the location of the MMDS 
transmitter and the 35-mile protected zone. The cable operator also 
should provide any other reasonably available technical and geographic 
information, as well as information about the geographic scope of the 
competitor's marketing efforts, to help establish that service is being 
offered to subscribers in the franchise area. Such data, whether with 
respect to a MMDS operator or some other LEC-affiliated MVPD, will also 
be relevant to a showing that there are no technical or other 
impediments to households taking service from the MVPD. Where 
appropriate, we will request additional relevant information from the 
competing MVPD.
    12. In addition, the cable operator must establish that ``potential 
subscribers in the franchise area are reasonably aware'' that they may 
purchase the competitor's service. The marketing efforts of the LEC or 
its affiliate often will be directly related to this issue. As we 
previously have observed, ``potential subscribers may be made 
reasonably aware of the availability of a competing service, for 
example, through advertising in regional or local media, direct mail, 
or any other marketing outlet.'' (Rate Order), 58 FR 29736 (May 21, 
1993). Thus, cable operators may rely on marketing information to the 
extent necessary to show consumer perceptions of the availability and 
comparability of the competing service. Again, the Commission may seek 
information directly from the competitor in appropriate circumstances.
3. Definition of ``comparable programming''
    13. The legislative history reveals Congress's intent that video 
programming be deemed ``comparable'' for purposes of this test if the 
competing service ``includes access to at least 12 channels of 
programming, at least some of which are television broadcasting 
signals.'' On an interim basis we will require the broadcast 
programming to include the signals of local broadcasters. Broadcast 
programming delivered by satellite (e.g., ``superstations'') shall not 
be deemed broadcast programming for purposes of the interim application 
of the new effective competition test.
4. MMDS Provision of Local Broadcast Channels
    14. The definitions of ``offer'' and ``comparable programming'' 
require us to address a further question that arises specifically in 
the context of MMDS. An MMDS operator has two ways of ensuring that its 
subscribers receive local broadcast programming. The operator can pull 
in the broadcast signals itself via its own centrally located broadcast 
antenna and then retransmit the entire package of broadcast and non-
broadcast signals to the microwave antenna located at the subscriber's 
residence, or the operator can install a separate broadcast antenna to 
complement the microwave antenna at each subscriber location. We must 
determine whether the wireless cable operator should be deemed to be 
``offering'' broadcast programming in the latter situation, i.e., when 
the operator does not transmit the broadcast signals to the subscriber 
via microwave. In that situation, the operator must join the broadcast 
signals to the microwave signals at some point. One approach is to join 
those signals in a single cable that runs to the back of the customer's 
television set or to a settop converter box. Another approach is to run 
separate cable lines from each antenna to an A/B switch from which a 
single line is connected to the television set.

[[Page 18971]]

The subscriber pushes the switch back and forth between the A position 
and the B position, depending upon whether the subscriber wants to see 
the broadcast channels or the microwave channels.
    15. On an interim basis, we will resolve this issue as follows. If 
the broadcast channels are available to the subscriber without an A/B 
switch or similar device, the MMDS operator will be deemed to be 
offering them within the meaning of Section 301(b)(3) of the 1996 Act. 
If an A/B switch or similar device is required, we will still deem the 
broadcast stations offered if the MMDS operator is responsible for the 
installation. However, if the customer must install his or her own A/B 
switch to receive the broadcast channels, the MMDS operator will not be 
deemed to be offering those channels. Inclusion of broadcast channels 
on the MMDS operator's rate card, advertising, or other marketing 
materials may be evidence that the MMDS operator offers the broadcast 
channels in accordance with our definition of ``offer.'' We note the 
significance of marketing materials because it is arguable that an MMDS 
operator that markets itself as a provider of local broadcast channels 
will take the steps necessary to ensure that subscribers receive those 
channels. In those circumstances, the broadcast channels would seem to 
be a part of the programming package that the MMDS operator is offering 
and providing, regardless of the technical means employed.
5. Definition of ``affiliate''
    16. Under our interim rules implementing this statute, an entity 
will be considered affiliated with a LEC if it meets the definition of 
``affiliate'' set forth in Section 3 of the 1996 Act:

    The term ``affiliate'' means a person that (directly or 
indirectly) owns or controls, is owned or controlled by, or is under 
common ownership or control with another person. For purposes of 
this paragraph, the term ``own'' means to own an equity interest (or 
the equivalent thereof) of more than 10 percent.

    17. We note that this definition of ``affiliate,'' which has been 
incorporated in Title I of the Communications Act, does not strictly 
apply to matters under Title VI, since Title VI contains a separate 
definition of that term that does not set a percentage threshold as to 
what constitutes ownership. We believe this gives us discretion to 
establish an ownership threshold other than 10% for purposes of Title 
VI. However, because a determination of the precise threshold must 
await the rulemaking we initiate in the accompanying NPRM, on an 
interim basis we find it reasonable to use the Title I ownership 
threshold that Congress has prescribed for purposes of most other 
provisions of the Communications Act. Therefore, effective competition 
under the new test may be established when a LEC owns an active or 
passive equity interest, or the equivalent thereof, of more than 10% in 
the competing MVPD. We will determine what constitutes the 
``equivalent'' of an equity interest on a case-by-case basis. 
Affiliation also can be shown through de facto control, regardless of 
the actual ownership interest. The ownership threshold we adopt in the 
interim does not in any way preclude the establishment of a permanent 
rule that incorporates a different threshold.
6. Procedures
    18. A cable system that meets all of the relevant criteria in the 
new effective competition test is exempt from rate regulation as of 
February 8, 1996, the date the 1996 Act was enacted. Such an operator 
may file a petition for a determination of effective competition with 
the Commission. The petition should demonstrate that all the relevant 
criteria are satisfied. We note that, by necessity, we have adopted the 
substantive requirements discussed above on an interim basis without 
the usual notice and comment proceeding. Accordingly, petitioners 
seeking a declaration of effective competition under the new test are 
free to provide additional information, consistent with the statute, 
that the operator believes proves the existence of effective 
competition that must exist in order to exempt an operator from rate 
regulation.
    19. This petition may be filed with the Commission at any time, 
including in response to a notice from the local franchising authority 
(``LFA'') that it intends to file a CPST rate complaint. (A LFA 
certified to regulate rates can simply withdraw its certification at 
any time if it believes the cable operator is subject to effective 
competition, or for any other reason.) The operator shall provide a 
copy of the petition to the LFA. The Commission will provide public 
notice of the petition's filing to enable interested parties to file 
responses to the petition. Thereafter, we will determine whether 
effective competition exists and may issue an order granting the 
petition. As we have noted, the Commission may issue an order directing 
one or more persons to produce information relevant to the operator's 
petition. For example, the order may be directed to a LEC that is 
asserted to hold an interest in an MVPD sufficient to reach affiliation 
levels that would trigger a finding of effective competition. The 
Commission will act promptly on these petitions. A Commission 
determination regarding effective competition will be applicable to 
both the BST and CPST.

B. CPST Rate Complaints

    20. Under existing regulations, adopted pursuant to Section 
623(c)(1)(B) of the Communications Act as it existed prior to the 1996 
Act, subscribers were allowed to file complaints concerning CPST rates 
directly with the Commission. Section 301(b)(1)(C) of the 1996 Act 
alters the manner in which the Commission reviews complaints concerning 
rates charged for a CPST. In particular, that Section provides:

    The Commission shall review any complaint submitted by a 
franchising authority after the date of enactment of the 
Telecommunications Act of 1996 concerning an increase in rates for 
cable programming services and issue a final order within 90 days 
after it receives such a complaint, unless the parties agree to 
extend the period for such review. A franchising authority may not 
file a complaint under this paragraph unless, within 90 days after 
such increase becomes effective, it receives subscriber complaints.

    21. Accordingly, we amend our rule to incorporate the self-
effectuating language of Section 301(b)(1)(C). In addition, we have 
eliminated the requirement in Section 76.964 of our rules that 
operators notify subscribers of their right to file complaints with the 
Commission. Also in Section 76.964, we eliminate the requirement that 
operators notify subscribers of the Commission's address and phone 
number for purposes of filing rate complaints. Subscriber complaints 
received by the Commission after February 8, 1996 are being returned to 
the subscriber with a notice of this change.
    22. We also establish interim rules governing the filing of rate 
complaints by LFAs. Section 301(b)(a)(C) authorizes an LFA to file a 
rate complaint with the Commission if the LFA receives subscriber 
complaints within 90 days after an operator's rate increase becomes 
effective. Although the statute allows only LFAs to file rate 
complaints directly with the Commission, subscribers now have twice as 
long to complain about a rate increase as they did under our previous 
rules. We provide in this interim rule that an LFA may file rate 
complaints with the Commission when the LFA receives more than one 
subscriber complaint concerning an operator's rate increase. 
Modifications to the Commission cable rate complaint form, Form 329, 
will be made accordingly. The records

[[Page 18972]]

maintained by an LFA in accordance with its regular business practice 
should be sufficient to establish that the LFA received the subscriber 
complaints within 90 days of a rate increase.
    23. If the LFA receives more than one subscriber complaint within 
the 90-day period and decides to file its own complaint with the 
Commission, it must do so no more than 180 days after the rate increase 
became effective. Before filing a complaint with the Commission, the 
LFA shall first give the cable operator written notice of its intent to 
do so and give the operator a minimum of 30 days to file with the LFA 
the relevant FCC Forms used to justify a rate increase. The LFA shall 
then forward its complaint and the operator's response to the 
Commission within the 180 day deadline specified above. If the operator 
fails to respond, the LFA should file its complaint and specify that 
the operator has not filed a response. We will then decide the case 
based upon the information before us. This procedure shall not apply to 
LFA complaints filed on or before the 15th day following the release 
date of this item. We will address those complaints filed prior to such 
date on an individual basis.

C. Small Cable Operators

1. Final Rule Change
    24. The 1996 Act exempts certain smaller cable systems from certain 
provisions of Section 623 of the Communications Act that authorize the 
Commission and LFAs to regulate cable rates. Specifically, Section 
301(c) of the 1996 Act amends Section 623 of the Communications Act by 
adding the following subsection:
    (m) Special Rules For Small Companies.
    (1) In General. Subsections (a), (b), and (c) do not apply to a 
small cable operator with respect to--
    (A) cable programming services, or
(B) a basic service tier that was the only service tier subject to 
regulation as of December 31, 1994,
in any franchise area in which that operator services 50,000 or fewer 
subscribers.
    (2) Definition of Small Cable Operator. For purposes of this 
subsection, the term ``small cable operator'' means a cable operator 
that, directly or through an affiliate, serves in the aggregate fewer 
than 1 percent of all subscribers in the United States and is not 
affiliated with any entity or entities whose gross annual revenues in 
the aggregate exceed $250,000,000.
    25. We amend our rules, to reflect the exceptions to rate 
regulation created by section 301(c) of the 1996 Act.
    26. Because Section 301(c) was effective upon enactment of the 
statute, we will establish in this Order interim rules to apply pending 
adoption of final rules.
2. Definition of ``small cable operator''
    27. With respect to the definition of a small cable operator, and 
for interim purposes only, we find that there are 61,700,000 cable 
subscribers in the United States. Therefore, an operator serving fewer 
than 617,000 subscribers shall be deemed a small operator if its annual 
revenues, when combined with the total annual revenues of all of its 
affiliates, do not exceed $250 million in the aggregate. Further, to 
implement the small operator provisions pending adoption of final 
rules, we will use the definition of ``affiliate'' that we adopted last 
year for purposes of our small system cost-of-service rules. Therefore, 
an entity shall be deemed affiliated with a small cable operator if 
that entity has a 20% or greater equity interest in the operator 
(active or passive) or holds de jure or de facto control over the 
operator. In the present context, we believe it is reasonable to apply 
our definition of affiliation as it exists under our small system 
rules, given that those rules and the small cable operator provisions 
of the 1996 Act all have the same intent of minimizing regulation and 
ensuring access to needed capital for smaller cable entities.

3. Scope of Deregulation

    28. Assuming an operator is eligible for deregulation under the 
statutory subscriber and revenue criteria, the scope of deregulation 
will depend, at least on an interim basis, upon the number of tiers of 
service that were subject to rate regulation as of December 31, 1994. 
We believe it to be Congress's intent that any qualifying system that 
had only a single tier of cable service subject to regulation as of 
December 31, 1994 shall be exempt from rate regulation as to all of its 
programming services, regardless of the number of tiers it now offers. 
By contrast, a qualifying system that had more than one tier subject to 
regulation as of December 31, 1994 shall remain regulated on the BST.
4. Procedures
    29. A cable operator that satisfies all of the relevant criteria is 
exempt from rate regulation as to the extent provided above effective 
February 8, 1996, the date the 1996 Act was enacted. If such an 
operator had only a single tier as of December 31, 1994, and the LFA 
for the franchise area in which that operator offers service is 
certified to regulate cable rates under the 1992 Cable Act, the 
operator should certify in writing to such LFA that the operator meets 
all of the criteria for deregulation of the BST. It may make this 
certification at any time. Upon request of the LFA, the operator shall 
identify in writing all of its affiliates that provide cable service, 
the total cable subscriber base of itself and each affiliate, and the 
aggregate gross revenues of all its cable and non-cable affiliates. 
Within 90 days of the original certification, the LFA shall determine 
whether the operator qualifies for deregulation and shall notify the 
operator in writing of its decision, although this 90-day period shall 
be tolled for so long as it takes the operator to respond to a proper 
request for information by the LFA. If the LFA finds that the operator 
does not qualify for deregulation, its notice shall state the grounds 
for that decision. The operator may challenge that decision by filing 
an appeal with the Commission within 30 days.
    30. Once the operator has certified its eligibility for 
deregulation on the BST, the LFA shall not prohibit the operator from 
taking a rate increase and shall not order the operator to make any 
refunds, unless and until the LFA has rejected the certification in a 
final order that is no longer subject to appeal or that the Commission 
has affirmed. Thus, the operator may take rate increases while its 
certification is pending. However, the operator shall be liable for 
refunds for the revenues it gains (beyond those revenues that it could 
have gained under regulation) as a result of any rate increase taken 
during the period in which it claimed to be deregulated, plus interest, 
in the event it is later found not to be deregulated. In addition, the 
running of the standard one-year limitation on refund liability will be 
tolled during that period to ensure that the filing of an invalid small 
operator certification does not reduce any refund liability that the 
operator otherwise would incur.
    31. A system that qualifies under the new small operator subscriber 
and revenue requirements and that had more than one tier as of December 
31, 1994 is deregulated on all its CPSTs as of February 8, 1996. Within 
30 days of being served with a LFA's notice that it intends to file a 
CPST rate complaint, such an operator shall certify to the LFA that it 
meets the relevant small operator criteria, in accordance with the new 
CPST rate complaint procedure described above. This certification shall 
be in lieu of the rate justification that an operator otherwise would 
submit. The LFA may either resolve the issue itself in accordance with 
the procedures set

[[Page 18973]]

forth immediately above, or it may forward its notice and the 
operator's response for Commission review in accordance with the new 
procedures for CPST rate complaints. No certification is necessary if 
the operator does not receive notice that the LFA intends to file a 
CPST rate complaint. If a pending CPST rate complaint was filed with 
the Commission before the effective date of these interim rules, the 
operator should file its certification of small operator status 
directly with the Commission within 15 days of that effective date.
    32. We adopt these interim rules solely for the purpose of 
implementing Section 301(c) of the 1996 Act pending our adoption of 
final rules. These interim rules in no way alter or amend our small 
system cost-of-service rules or any other rules applicable to small 
systems or small cable companies, except to the extent such rules no 
longer apply to systems deregulated under Section 301(c) of the 1996 
Act.
4. Relationship With Preexisting Small System Rules
    33. In the interests of eliminating confusion and uncertainty, we 
will summarize the separate treatment available to small systems as 
defined by our preexisting rules. Last year, the Commission adopted 
rules streamlining cost-of-service rate regulation for any system 
serving fewer than 15,000 subscribers (a ``small system''), as long as 
the system is owned by an operator that serves no more than 400,000 
subscribers over all of its systems (a ``small cable company''). Once a 
system qualifies under these criteria, it remains subject to the 
relaxed rules for so long as the system serves fewer than 15,000 
subscribers, even if the company later exceeds 400,000 subscribers or 
if the small system is acquired by an operator with more than 400,000 
subscribers. When the system exceeds 15,000 subscribers, it may 
maintain its current rates but cannot seek an increase until such an 
increase is permitted under our standard rate rules applicable to 
systems generally. Our small system rules are unaffected by the 1996 
Act or this rulemaking.

D. Uniform Rate Requirement

    34. Prior to enactment of the 1996 Act, Section 623(d) of the 
Communications Act provided in full: ``A cable operator shall have a 
rate structure, for the provision of cable service, that is uniform 
throughout the geographic area in which cable service is provided over 
its cable system.'' Section 76.984 of the Commission's rules was 
adopted to implement this requirement. The Commission interpreted the 
rules (and the statutory requirement) as applying to systems not facing 
effective competition as well as to those facing effective competition. 
Upon review, the court in Time Warner Entertainment Co. v. FCC found 
this interpretation to be incorrect, holding that ``[a]pplication of 
the uniform rate provision to competitive systems violates 47 U.S.C. 
Sec. 543(a)(2). . . .''
    35. Section 301(b)(2) of the 1996 Act addresses the uniform rate 
structure through a statutory amendment which, in relevant part, is 
consistent with the action of the court. It amends the uniform rate 
provision by adding the following at the end of Section 623(d):

    This subsection does not apply to (1) a cable operator with 
respect to the provision of cable service over its cable system in 
any geographic area in which the video programming services offered 
by the operator in that area are subject to effective competition, 
or (2) any video programming offered on a per channel or per program 
basis. Bulk discounts to multiple dwelling units shall not be 
subject to this subsection, except that a cable operator of a cable 
system that is not subject to effective competition may not charge 
predatory prices to a multiple dwelling unit. Upon a prima facie 
showing by a complainant that there are reasonable grounds to 
believe that the discounted price is predatory, the cable system 
shall have the burden of showing that its discounted price is not 
predatory.

    36. Accordingly, we amend Section 76.984 of our rules to conform to 
the new statutory language.
    37. Until final rules are adopted, the complaint process 
established by Section 301(b)(2) of the 1996 Act shall be governed by 
the provisions of Section 76.7 of our rules applicable to petitions for 
special relief generally.

E. Subscriber Notice

    38. Section 301(g) of the 1996 Act adds a new subsection to Section 
632 of the Communications Act. The new subsection reads as follows:

    Subscriber Notice. A cable operator may provide notice of 
service and rate changes to subscribers using any reasonable written 
means at its sole discretion. Notwithstanding section 623(b)(6) or 
any other provision of this Act, a cable operator shall not be 
required to provide prior notice of any rate change that is the 
result of a regulatory fee, franchise fee, or any other fee, tax 
assessment, or charge of any kind imposed by any Federal agency, 
State, or franchising authority on the transaction between the 
operator and the subscriber.

    39. Accordingly, we modify our rules pursuant to Section 301(g) of 
the 1996 Act to provide that a cable operator may provide notice of 
service and rate changes to subscribers using any reasonable written 
means at its sole discretion, and that a cable operator shall not be 
required to provide prior notice of any rate change that is the result 
of a regulatory fee, franchise fee, or any other fee, tax assessment, 
or charge of any kind imposed by any Federal agency, State, or 
franchising authority on the transaction between the operator and the 
subscriber.
    40. We note that previously the Commission distinguished written 
notice sent to subscribers from written announcements on the cable 
system or in the newspaper. We made these distinctions in an effort to 
ensure that notice was adequate depending upon the circumstances. We 
now note the legislative history of the House amendment, which was 
ultimately adopted by the Conference Committee, states that ``[n]otice 
need not be inserted in the subscriber's bill.'' Given the cited 
statutory provision and its legislative history, a change in our 
current rules is justified so that notice provided through written 
announcements on the cable system or in the newspaper will be presumed 
sufficient. We believe this furthers Congressional intent regarding the 
adequacy of any required notice. We will address any disputes that may 
arise in this area on a case-by-case basis.

F. Technical Standards

    41. Pursuant to Section 624(e) of the Communications Act, the 
Commission has adopted technical standards that govern the picture 
quality performance of cable television systems. Prior to enactment of 
the 1996 Act, Section 624(e) provided, in part:

    A franchising authority may require as part of a franchise 
(including a modification, renewal, or transfer thereof) provisions 
for the enforcement of the standards prescribed under this 
subsection. A franchising authority may apply to the Commission for 
a waiver to impose standards that are more stringent than the 
standards prescribed by the Commission under this subsection.

    42. Section 301(e) of the 1996 Act strikes the above two sentences 
and adds the following:

    No State or franchising authority may prohibit, condition, or 
restrict a cable system's use of any type of subscriber equipment or 
any transmission technology.

    43. Thus, we eliminate the language in Note Six to Section 76.605 
of our rules which permitted a franchising authority to apply to the 
Commission for a waiver to impose cable technical standards that are 
more stringent than the standards prescribed by the Commission. We 
insert the new language from Section 301(e) in Note Six.

[[Page 18974]]

G. Buy Out Prohibitions

    44. Section 302(a) of the 1996 Act creates a new Section 652 of the 
Communications Act that provides as follows:

    (a) Acquisitions By Carriers. No local exchange carrier or any 
affiliate of such carrier owned by, operated by, controlled by, or 
under common control with such carrier may purchase or otherwise 
acquire directly or indirectly more than a 10 percent financial 
interest, or any management interest, in any cable operator 
providing cable service within the local exchange carrier's 
telephone service area.
    (b) Acquisitions By Cable Operators. No cable operator or 
affiliate of a cable operator that is owned by, operated by, 
controlled by, or under common ownership with such cable operator 
may purchase or otherwise acquire, directly or indirectly, more than 
a 10 percent financial interest, or any management interest, in any 
local exchange carrier providing telephone exchange service within 
such cable operator's franchise area.
    (c) Joint Ventures. A local exchange carrier and a cable 
operator whose telephone service area and cable franchise area, 
respectively, are in the same market may not enter into any joint 
venture or partnership to provide video programming directly to 
subscribers or to provide telecommunications services within such 
market.
    (d) Exceptions.
    (1) Rural Systems. Notwithstanding subsections (a), (b), and (c) 
of this section, a local exchange carrier (with respect to a cable 
system located in its telephone service area) and a cable operator 
(with respect to the facilities of a local exchange carrier used to 
provide telephone exchange service in its cable franchise area) may 
obtain a controlling interest in, management interest in, or enter 
into a joint venture or partnership with the operator of such system 
or facilities for the use of such system or facilities to the extent 
that--
    (A) such system or facilities only serve incorporated or 
unincorporated--
    (i) places or territories that have fewer than 35,000 
inhabitants; and
    (ii) are outside an urbanized area, as defined by the Bureau of 
the Census; and
    (B) in the case of a local exchange carrier, such system, in the 
aggregate with any other system in which such carrier has an 
interest, serves less than 10 percent of the households in the 
telephone service area of such carrier.
    (2) Joint Use. Notwithstanding subsection (c), a local exchange 
carrier may obtain, with the concurrence of the cable operator on 
the rates, terms, and conditions, the use of that part of the 
transmission facilities of a cable system extending from the last 
multi-user terminal to the premises of the end user, if such use is 
reasonably limited in scope and duration, as determined by the 
Commission.
    (3) Acquisitions in Competitive Markets. Notwithstanding 
subsections (a) and (c), a local exchange carrier may obtain a 
controlling interest in, or form a joint venture or other 
partnership with, or provide financing to, a cable system 
(hereinafter in this paragraph referred to as ``the subject cable 
system'') if--
    (A) the subject cable system operates in a television market 
that is not in the top 25 markets, and such market has more than 1 
cable system operator, and the subject cable system is not the cable 
system with the most subscribers in such television market;
    (B) the subject cable system and the cable system with the most 
subscribers in such television market held on May 1, 1995, cable 
television franchises from the largest municipality in the 
television market and the boundaries of such franchises were 
identical on such date;
    (C) the subject cable system is not owned by or under common 
ownership or control of any one of the 50 cable system operators 
with the most subscribers as such operators existed on May 1, 1995; 
and
    (D) the system with the most subscribers in the television 
market is owned by or under common ownership or control of any one 
of the 10 largest cable system operators as such operators existed 
on May 1, 1995.
    (4) Exempt Cable Systems. Subsection (a) does not apply to any 
cable system if--
    (A) the cable system serves no more than 17,000 cable 
subscribers, of which no less than 8,000 live within an urban area, 
and no less than 6,000 live within a nonurbanized area as of June 1, 
1995;
    (B) the cable system is not owned by, or under common ownership 
or control with, any of the 50 largest cable system operators in 
existence on June 1, 1995; and
    (C) the cable system operates in a television market that was 
not in the top 100 television markets as of June 1, 1995.
    (5) Small Cable Systems In Nonurban Areas. Notwithstanding 
subsections (a) and (c), a local exchange carrier with less than 
$100,000,000 in annual operating revenues (or any affiliate of such 
carrier owned by, operated by, controlled by, or under common 
control with such carrier) may purchase or otherwise acquire more 
than a 10 percent financial interest in, or any management interest 
in, or enter into a joint venture or partnership with, any cable 
system within the local exchange carrier's telephone service area 
that serves no more than 20,000 cable subscribers, if no more than 
12,000 of those subscribers live within an urbanized area, as 
defined by the Bureau of the Census.
    (6) Waivers. The Commission may waive the restrictions of 
subsections (a), (b), or (c) only if:
    (A) the Commission determines that, because of the nature of the 
market served by the affected cable system or facilities used to 
provide telephone exchange service--
    (i) the affected cable operator or local exchange carrier would 
be subjected to undue economic distress by the enforcement of such 
provisions;
    (ii) the system or facilities would not be economically viable 
if such provisions were enforced; or
    (iii) the anticompetitive effects of the proposed transaction 
are clearly outweighed in the public interest by the probable effect 
of the transaction in meeting the convenience and needs of the 
community to be served; and
    (B) the local franchising authority approves of such waiver.
    (e) Definition Of Telephone Service Area. For purposes of this 
section, the term ``telephone service area'' when used in connection 
with a common carrier subject in whole or in part to title II of 
this Act means the area within which such carrier provided telephone 
exchange service as of January 1, 1993, but if any common carrier 
after such date transfers its telephone exchange service facilities 
to another common carrier, the area to which such facilities provide 
telephone exchange service shall be treated as part of the telephone 
service area of the acquiring common carrier and not of the selling 
common carrier.

    45. Accordingly, we add a new section to our rules regarding the 
ownership of cable systems to incorporate the provisions of Section 
302(a) of the 1996 Act described above.
    46. With respect to the joint use provisions of Section 302(a), the 
Commission will make such determinations on a case-by-case basis using 
the following procedures in accordance with Section 76.7 of our rules. 
Within ten days of final execution of a contract permitting a local 
exchange carrier to use that part of the transmission facilities of a 
cable system extending from the last multi-user terminal to the 
premises of the end user, the parties shall submit a copy of such 
contract, along with an explanation of how such contract is reasonably 
limited in scope and duration, to the Commission for review. The 
parties shall serve a copy of this submission on the LFA, along with a 
notice of the deadline by which the LFA must file comments, if any, 
with the Commission. Based upon the record before it, the Commission 
shall then determine whether the local exchange carrier's use of that 
part of the transmission facilities of a cable system extending from 
the last multi-user terminal to the premises of the end user is 
reasonably limited in scope and duration. In determining whether such 
use is reasonably limited in scope and duration, the Commission will 
look to the underlying policy goals of the legislation: To promote 
competition in both services and facilities, and to encourage long-term 
investment in the infrastructure.

H. Program Access

    47. Section 628 of the Communications Act governs access to 
programming. These program access provisions are intended to eliminate 
unfair competitive practices and facilitate competition by providing 
competitive access to certain defined categories of programming. 
Generally speaking, the restrictions in Section 628 are applicable to 
cable operators, satellite cable programming vendors in which a cable 
operator has an attributable interest, and satellite broadcast 
programming vendors. The

[[Page 18975]]

Commission rules implementing Section 628 appear at Section 76.1000 et 
seq.

    48. Section 301(j) of the 1996 Act amends section 628 by adding 
the following: (j) Common Carriers.--Any provision that applies to a 
cable operator under this section shall apply to a common carrier or 
its affiliate that provides video programming by any means directly 
to subscribers. Any such provision that applies to a satellite cable 
programming vendor in which a cable operator has an attributable 
interest shall apply to any satellite cable programming vendor in 
which such common carrier has an attributable interest. For the 
purposes of this subsection, two or fewer common officers or 
directors shall not by itself establish an attributable interest by 
a common carrier in a satellite cable programming vendor (or its 
parent company).

    49. Accordingly, we add a new section to the program access rules 
to broaden their scope as described above. We also note that the 
meaning of the term ``attributable interest'' as defined in our program 
access rules shall also apply to common carriers, subject to the last 
sentence of Section 301(j) of the 1996 Act, for purposes of program 
access.

I. Sunset of Upper Tier Rate Regulation

    50. Consistent with the 1992 Cable Act, the Commission established 
rules to ensure that rates for cable programming services are not 
unreasonable. The 1996 Act adds a provision to the Communications Act 
that provides a sunset date for regulation of CPST rates. Specifically, 
rate regulation ``shall not apply to cable programming services 
provided after March 31, 1999.''
    51. Accordingly, to implement this mandate, we are amending our 
rules to include the statutory sunset provision.

J. Definition of ``Cable System''

    52. Prior to enactment of the 1996 Act, and subject to four 
specific exceptions, Section 602(7) of the Communications Act defined 
the term ``cable system'' to include:

    A set of closed transmission paths and associated signal 
generation, reception, and control equipment that is designed to 
provide cable service which includes video programming and which is 
provided to multiple subscribers within a community. . . .

    53. The four exceptions to this definition included

    . . . (B) a facility that serves only subscribers in 1 or more 
multiple unit dwellings under common ownership, control, or 
management, unless such facility or facilities uses any public right 
of way; [and] (C) a facility of a common carrier which is subject, 
in whole or in part, to the provisions of Title II of this Act, 
except that such facility shall be considered a cable system (other 
than for purposes of section 621(c)) to the extent such facility is 
used in the transmission of video programming directly to 
subscribers. . . .

    54. This statutory definition and the four exceptions were 
incorporated into Section 76.5(a) of the Commission's rules.
    55. The 1996 Act revises the definition of a cable system by 
amending the two exceptions cited above and by adding a third 
exception. Section 301 of the 1996 Act amends the first exception cited 
above, subsection (B), by striking the quoted language and inserting 
the following: ``(B) a facility that serves subscribers without using 
any public right-of-way.'' Section 302 of the 1996 Act amends the 
second exception quoted above, subsection (C), by adding the following 
clause at the end of that subsection: ``, unless the extent of such use 
is solely to provide interactive on-demand services.'' In addition, 
Section 302 creates a new exception to the cable systems definition as 
follows: ``(D) an open video system that complies with section 653 of 
this title.'' Finally, Section 302 of the 1996 Act moves what had been 
the fourth exception, subsection (D), to new subsection (E) of section 
602(7) of the Communications Act.
    56. In order to conform Section 76.5(a) to the new statutory 
definition, we amend our rules accordingly.
    57. Section 302 of the 1996 Act also adds the following definition 
corresponding to one of the exceptions to the cable system definition:

    The term ``interactive on-demand services'' means a service 
providing video programming to subscribers over switched networks on 
an on-demand, point-to-point basis, but does not include services 
providing video programming prescheduled by the programming 
provider;

    58. Section 76.5 of our rules is amended to add this definition.

K. Definition of ``Cable Service''

    59. Section 602(6) of the Communications Act defines the term 
``cable service.'' Cable service is also defined in Section 76.5(ff) of 
the rules. The 1996 Act amends that statutory definition by adding the 
bracketed words:

    (ff) Cable service. The one-way transmission to subscribers of 
video programming, or other programming service; and, subscriber 
interaction, if any, which is required for the selection [or use] of 
such video programming or other programming service. For the 
purposes of this definition, ``video programming'' is programming 
provided by, or generally considered comparable to programming 
provided by, a television broadcast station; and, ``other 
programming service'' is information that a cable operator makes 
available to all subscribers generally.

    60. According to the legislative history of this provision, it 
reflects the evolution of cable to include interactive services such as 
game channels, information services made available to subscribers by 
the cable operator, and enhanced services. This amendment is not 
intended to affect Federal or State regulations of telecommunications 
service offered through cable system facilities, or to cause dial-up 
access to information services over telephone lines to be classified as 
a cable service.
    61. Accordingly, we amend our rules to conform Section 76.5(ff) to 
the new statutory definition.

L. Cable Operator Refusal To Carry Certain Programming

    62. Sec. 506(a) of the 1996 Act amends Sec. 611(e) of the 
Communications Act, which governs public, educational, and governmental 
access channels, by providing that ``a cable operator may refuse to 
transmit any public access program or portion of a public access 
program which contains obscenity, indecency, or nudity.''
    63. Therefore, we amend the first sentence of Section 76.702 of the 
Commission's rules by adding the bracketed language:

    Any cable operator may prohibit the use on its system of any 
channel capacity of any public, educational, or governmental access 
facility for any programming which contains obscene material, 
indecent material as defined in Sec. 76.701(g), [nudity], or 
material soliciting or promoting unlawful conduct.

    64. The 1996 Act contains a similar provision concerning 
programming provided over leased access channels. Specifically, Section 
506(b) of the 1996 Act amends Section 612(c)(2) of the Communications 
Act, which restricts a cable operator's exercise of editorial control 
over leased access programming, to provide that ``a cable operator may 
refuse to transmit any leased access program or portion of a leased 
access program which contains obscenity, indecency, or nudity . . . .''
    65. However, the 1996 Act does not alter Section 612(h) of the 
Communications Act which permits a cable operator

    to enforce prospectively a written and published policy of 
prohibiting programming that the cable operator reasonably believes 
describes or depicts sexual or excretory activities of organs in a 
patently offensive manner as measured by contemporary community 
standards.

[[Page 18976]]

    66. Section 76.701(a) of the Commission's rules parallels Section 
612(h) of the 1996 Act. The remaining subsections of Section 76.701 
contain related provisions. Under sections 76.701(b) and (c), an 
operator that chooses to carry leased access programming falling within 
the description contained in Section 76.701(a) must place all such 
programming on channels made available only to subscribers who have 
made a written request for the program and have certified to being at 
least 18 years old. Subsections (d) and (e) require a person providing 
leased access programming to identify, upon request of the cable 
operator, any indecent programming or to certify that the programming 
is not indecent or obscene. Subsection (f) permits the cable operator 
to withhold access from a program provider that does not comply with an 
operator request made under this rule. Subsection (g) defines 
``indecent programming'' and subsection (h) requires operators to 
maintain records verifying their compliance with these rules.
    67. Reading the amended version of Section 612(c)(2) of the 
Communications Act together with the pre-existing provisions of Section 
612(h), we amend Section 76.701 such that its various subsections now 
apply to ``any leased access program or portion of a leased access 
program which the cable operator reasonably believes contains 
obscenity, indecency, or nudity.''
    68. The underlying Commission rules being amended here (Sections 
76.701 and 76.702, 47 CFR Secs. 76.701 and 76.702) were adopted to 
implement Section 10 of the 1992 Cable Act. These provisions are the 
subject of the litigation in Alliance for Community Media v. FCC. In 
that case, a panel of the D.C. Circuit Court of Appeals reversed and 
remanded the rules to the Commission on the grounds that Section 10 of 
the 1992 Act violated the First Amendment or raised serious 
constitutional questions that warranted Commission reconsideration. The 
full court vacated the panel's judgment and found the requirements 
constitutional. The rules were stayed after the initial decision 
finding them unconstitutional and that stay has been continued in force 
pending Supreme Court review. Oral argument before the Supreme Court 
took place on February 24, 1996. Nothing herein is intended to affect 
the status of that stay. Accordingly, these amendments are stayed for 
as long as the Alliance stay remains effective.

III. Regulatory Flexibility Analysis

    69. Pursuant to the Regulatory Flexibility Act of 1980, 5 U.S.C. 
Secs. 601-612, the Commission's Flexibility Analysis with respect to 
the Report and Order is as follows:
    70. Need and purpose of this action: The Commission issues this 
Report and Order to enact or revise rules in response to the 1996 Act.
    71. Significant Alternatives considered: Not applicable because 
action is taken pursuant to statutory directive.
    72. Federal rules that overlap, duplicate or conflict with these 
rules: None.

IV. Inital Paperwork Reduction Act of 1995 Analysis

    73. This Order contains modified information collection 
requirements. As part of our continuing effort to reduce paperwork 
burdens, we invite the general public and the Office of Management and 
Budget (``OMB'') to take this opportunity to comment on the information 
collections contained in this Order, as required by the Paperwork 
Reduction Act of 1995, Pub. L. No. 104-13. Public and agency comments 
are due at the same time as other comments on the NPRM; OMB comments 
are due 60 days from the date of publication of this Order in the 
Federal Register. Comments should address: (a) Whether the collection 
of information is necessary for the proper performance of the functions 
of the Commission, including whether the information shall have 
practical utility; (b) the accuracy of the Commission's burden 
estimates; (c) ways to enhance the quality, utility, and clarity of the 
information collected; and (d) ways to minimize the burden of the 
collection of information on the respondents, including the use of 
automated collection techniques or other forms of information 
technology.

V. Effective Date

    74. The statutory requirements reflected in the final rules adopted 
in the Order were effective February 8, 1996, the date of enactment of 
the 1996 Act. The interim rules adopted in the Order are effective upon 
publication of the Order in the Federal Register. We find good cause 
for making these rule changes effective upon publication in the Federal 
Register because the rules merely either implement statutory language 
from the 1996 Act, or establish interim procedures (pending the 
adoption of final rules) in response to immediately effective statutory 
provisions in the 1996 Act. We also find notice and comment is not 
necessary or in the public interest in this limited context. 
Accordingly, the Commission will forego notice and comment pursuant to 
the ``good cause'' exception of the Administrative Procedure Act. See 5 
U.S.C. Sec. 553(d).

VI. Ordering Clauses

    79. It is Ordered that pursuant to sections 4(i), 4(j) of the 
Communications Act of 1934, as amended, 47 U.S.C. Secs. 154(i), 154(j), 
303(r), and Telecommunications Act of 1996, Sec. 301, the Commission's 
Rules are amended as set forth below, effective April 30, 1996.
    80. It is further ordered that we are revising these rules without 
providing prior public notice and an opportunity for comment because 
the rule modifications are mandated by the applicable provisions of the 
1996 Act. We find that notice and comment procedures are unnecessary, 
and that therefore this action falls within the ``good cause'' 
exception of the Administrative Procedure Act. 5 U.S.C. Sec. 553(b)(B). 
The final rules adopted in this Order do not involve discretionary 
action on the part of the Commission. Rather, they simply implement 
provisions of the 1996 Act according to the specific terms set forth in 
the legislation, or establish interim procedures (pending the adoption 
of final rules) in response to immediately effective statutory 
provisions in the 1996 Act. For the same reasons, we find good cause to 
make the rules effective April 30, 1996.
    81. It is further ordered that the Secretary shall send a copy of 
this Order, including the IRFA, to the Chief Counsel for Advocacy of 
the Small Business Administration in accordance with paragraph 603(a) 
of the Regulatory Flexibility Act, Pub. L. No. 96-354, 94 Stat. 1164, 5 
U.S.C. Secs. 601, et seq. (1981).
    82. For additional information regarding this proceeding, contact 
Tom Power, Paul Glenchur, or Nancy Stevenson, Policy and Rules 
Division, Cable Services Bureau (202) 416-0800.

List of Subjects in 47 CFR Part 76

    Cable television.

Federal Communications Commission.
William F. Caton,
Acting Secretary.

 Rule Changes

    Part 76 of Title 47 of the Code of Federal Regulations is amended 
as follows:

[[Page 18977]]

PART 76--CABLE TELEVISION SERVICE

    1. The authority citation for Part 76 continues to read as follows:

    Authority: Secs. 2, 3, 4, 301, 303, 307, 308, 309, 48 Stat., as 
amended, 1064, 1065, 1066, 1081, 1082, 1083, 1084, 1085, 1101; 47 
U.S.C. Sec. 152, 153, 154, 301, 303, 307, 308, 309; Secs. 612, 614-
615, 623, 632 as amended, 106 Stat. 1460, 47 U.S.C. 532; Sec. 623, 
as amended, 106 Stat. 1460; 47 U.S.C. 532, 533, 535, 543, 552.

    2. Section 76.5 is amended by revising paragraphs (a) and (ff) to 
read as follows:

Sec. 76.5  Definitions.

    (a) Cable system or cable television system. A facility consisting 
of a set of closed transmission paths and associated signal generation, 
reception, and control equipment that is designed to provide cable 
service which includes video programming and which is provided to 
multiple subscribers within a community, but such term does not 
include:
    (1) A facility that services only to retransmit the television 
signals of one or more television broadcast stations;
    (2) A facility that serves subscribers without using any public 
right-of-way;
    (3) A facility of a common carrier which is subject, in whole or in 
part, to the provisions of Title II of the Communications Act of 1934, 
as amended, except that such facility shall be considered a cable 
system to the extent such facility is used in the transmission of video 
programming directly to subscribers, unless the extent of such use is 
solely to provide interactive on-demand services;
    (4) An open video system that complies with Section 653 of the 
Communications Act; or
    (5) Any facilities of any electric utility used solely for 
operating its electric utility systems.

    Note to paragraph (a): The provisions of Subparts D and F of this 
part shall also apply to all facilities defined previously as cable 
systems on or before April 28, 1985, except those that serve 
subscribers without using any public right-of-way.
* * * * *
    (ff) Cable service. The one-way transmission to subscribers of 
video programming, or other programming service; and, subscriber 
interaction, if any, which is required for the selection or use of such 
video programming or other programming service. For the purposes of 
this definition, ``video programming'' is programming provided by, or 
generally considered comparable to programming provided by, a 
television broadcast station; and, ``other programming service'' is 
information that a cable operator makes available to all subscribers 
generally.
* * * * *
    3. Section 76.309 is amended by revising paragraph (c)(3)(i)(B) to 
read as follows:

Sec. 76.309  Customer service obligations.

* * * * *
    (c) * * *
    (3) * * *
    (i) * * *
    (B) Customers will be notified of any changes in rates, programming 
services or channel positions as soon as possible in writing. Notice 
must be given to subscribers a minimum of thirty (30) days in advance 
of such changes if the change is within the control of the cable 
operator. In addition, the cable operator shall notify subscribers 
thirty (30) days in advance of any significant changes in the other 
information required by paragraph (c)(3)(i)(A) of this section. 
Notwithstanding any other provision of Part 76, a cable operator shall 
not be required to provide prior notice of any rate change that is the 
result of a regulatory fee, franchise fee, or any other fee, tax, 
assessment, or charge of any kind imposed by any Federal agency, State, 
or franchising authority on the transaction between the operator and 
the subscriber.
* * * * *
    4.-5. A new Sec. 76.505 is added to read as follows:

Sec. 76.505   Prohibition on buy outs.

    (a) No local exchange carrier or any affiliate of such carrier 
owned by, operated by, controlled by, or under common control with such 
carrier may purchase or otherwise acquire directly or indirectly more 
than a 10 percent financial interest, or any management interest, in 
any cable operator providing cable service within the local exchange 
carrier's telephone service area.
    (b) No cable operator or affiliate of a cable operator that is 
owned by, operated by, controlled by, or under common ownership with 
such cable operator may purchase or otherwise acquire, directly or 
indirectly, more than a 10 percent financial interest, or any 
management interest, in any local exchange carrier providing telephone 
exchange service within such cable operator's franchise area.
    (c) A local exchange carrier and a cable operator whose telephone 
service area and cable franchise area, respectively, are in the same 
market may not enter into any joint venture or partnership to provide 
video programming directly to subscribers or to provide 
telecommunications services within such market.
    (d) Exceptions:
    (1) Notwithstanding paragraphs (a), (b), and (c) of this section, a 
local exchange carrier (with respect to a cable system located in its 
telephone service area) and a cable operator (with respect to the 
facilities of a local exchange carrier used to provide telephone 
exchange service in its cable franchise area) may obtain a controlling 
interest in, management interest in, or enter into a joint venture or 
partnership with the operator of such system or facilities for the use 
of such system or facilities to the extent that:
    (i) Such system or facilities only serve incorporated or 
unincorporated :
    (A) Places or territories that have fewer than 35,000 inhabitants; 
and
    (B) Are outside an urbanized area, as defined by the Bureau of the 
Census; and
    (ii) In the case of a local exchange carrier, such system, in the 
aggregate with any other system in which such carrier has an interest, 
serves less than 10 percent of the households in the telephone service 
area of such carrier.
    (2) Notwithstanding paragraph (c) of this section, a local exchange 
carrier may obtain, with the concurrence of the cable operator on the 
rates, terms, and conditions, the use of that part of the transmission 
facilities of a cable system extending from the last multi-user 
terminal to the premises of the end user, if such use is reasonably 
limited in scope and duration, as determined by the Commission.
    (3) Notwithstanding paragraphs (a) and (c) of this section, a local 
exchange carrier may obtain a controlling interest in, or form a joint 
venture or other partnership with, or provide financing to, a cable 
system (hereinafter in this paragraph referred to as ``the subject 
cable system'') if:
    (i) The subject cable system operates in a television market that 
is not in the top 25 markets, and such market has more than 1 cable 
system operator, and the subject cable system is not the cable system 
with the most subscribers in such television market;
    (ii) The subject cable system and the cable system with the most 
subscribers in such television market held on May 1, 1995, cable 
television franchises from the largest municipality in the television 
market and the boundaries of such franchises were identical on such 
date;
    (iii) The subject cable system is not owned by or under common 
ownership or control of any one of the 50 cable system operators with 
the most subscribers as such operators existed on May 1, 1995; and

[[Page 18978]]

    (iv) The system with the most subscribers in the television market 
is owned by or under common ownership or control of any one of the 10 
largest cable system operators as such operators existed on May 1, 
1995.
    (4) Paragraph (a) of this section does not apply to any cable 
system if:
    (i) The cable system serves no more than 17,000 cable subscribers, 
of which no less than 8,000 live within an urban area, and no less than 
6,000 live within a nonurbanized area as of June 1, 1995;
    (ii) The cable system is not owned by, or under common ownership or 
control with, any of the 50 largest cable system operators in existence 
on June 1, 1995; and
    (iii) The cable system operates in a television market that was not 
in the top 100 television markets as of June 1, 1995.
    (5) Notwithstanding paragraphs (a) and (c) of this section, a local 
exchange carrier with less than $100,000,000 in annual operating 
revenues (or any affiliate of such carrier owned by, operated by, 
controlled by, or under common control with such carrier) may purchase 
or otherwise acquire more than a 10 percent financial interest in, or 
any management interest in, or enter into a joint venture or 
partnership with, any cable system within the local exchange carrier's 
telephone service area that serves no more than 20,000 cable 
subscribers, if no more than 12,000 of those subscribers live within an 
urbanized area, as defined by the Bureau of the Census.
    (6) The Commission may waive the restrictions of paragraphs (a), 
(b), or (c) of this section only if:
    (i) The Commission determines that, because of the nature of the 
market served by the affected cable system or facilities used to 
provide telephone exchange service:
    (A) The affected cable operator or local exchange carrier would be 
subjected to undue economic distress by the enforcement of such 
provisions;
    (B) The system or facilities would not be economically viable if 
such provisions were enforced; or
    (C) The anticompetitive effects of the proposed transaction are 
clearly outweighed in the public interest by the probable effect of the 
transaction in meeting the convenience and needs of the community to be 
served; and
    (ii) The local franchising authority approves of such waiver.
    (e) For purposes of this section, the term ``telephone service 
area'' when used in connection with a common carrier subject in whole 
or in part to title II of the Communications Act means the area within 
which such carrier provided telephone exchange service as of January 1, 
1993, but if any common carrier after such date transfers its telephone 
exchange service facilities to another common carrier, the area to 
which such facilities provide telephone exchange service shall be 
treated as part of the telephone service area of the acquiring common 
carrier and not of the selling common carrier.
    6. Section 76.605 is amended by revising paragraph (b) Note 6 to 
read as follows:

Sec. 76.605  Technical standards.

* * * * *
    Note 6: No State or franchising authority may prohibit, condition, 
or restrict a cable system's use of any type of subscriber equipment or 
any transmission technology.

    7. Section 76.701 is amended by adding new paragraph (i) to read as 
set forth below. Effective April 30, 1996, paragraph (i) is stayed.

Sec. 76.701  Leased access channels.

* * * * *
    (i) Paragraphs (a) through (h) of this section apply to any 
FR Doc. 96-10173 Telecommunications Act of 1996
leased 
access program or portion of a leased access program which the cable 
operator reasonably believes contains obscenity, indecency, or nudity.
    8. Section 76.702 is revised to read as set forth below. Effective 
April 30, 1996, Sec. 76.702 is stayed.

Sec. 76.702  Public, educational and governmental access.

    Any cable operator may prohibit the use on its system of any 
channel capacity of any public, educational, or governmental access 
facility for any programming which contains nudity, obscene material or 
indecent material as defined in Sec. 76.701(g), or material soliciting 
or promoting unlawful conduct. For purposes of this section, ``material 
soliciting or promoting unlawful conduct'' shall mean material that is 
otherwise proscribed by law. A cable operator may require any access 
user, or access manager or administrator agreeing to assume the 
responsibility of certifying, to certify that its programming does not 
contain any of the materials described in this section and that 
reasonable efforts will be used to ensure that live programming does 
not contain such material.
    9. Section 76.905 is amended by adding new paragraph (b)(4) to read 
as follows:

Sec. 76.905  Standards for identification of cable systems subject to 
effective competition.

* * * * *
    (b) * * *
    (4) A local exchange carrier or its affiliate (or any multichannel 
video programming distributor using the facilities of such carrier or 
its affiliate) offers video programming services directly to 
subscribers by any means (other than direct-to-home satellite services) 
in the franchise area of an unaffiliated cable operator which is 
providing cable service in that franchise area, but only if the video 
programming services so offered in that area are comparable to the 
video programming services provided by the unaffiliated cable operator 
in that area.
* * * * *
    10. Section 76.933 is amended by revising paragraphs (e) and (g)(5) 
to read as follows:

Sec. 76.933  Franchising authority review of basic cable rates and 
equipment costs.

* * * * *
    (e) Notwithstanding paragraphs (a) through (d) of this section, 
when the franchising authority is regulating basic service tier rates, 
a cable operator that sets its rates pursuant to the quarterly rate 
adjustment system pursuant to Sec. 76.922(d) may increase its rates for 
basic service to reflect the imposition of, or increase in, franchise 
fees or Commission cable television system regulatory fees imposed 
pursuant to 47 U.S.C. 159. For the purposes of paragraphs (a) through 
(c) of this section, the increased rate attributable to Commission 
regulatory fees or franchise fees shall be treated as an ``existing 
rate'', subject to subsequent review and refund if the franchising 
authority determines that the increase in basic tier rates exceeds the 
increase in regulatory fees or in franchise fees allocable to the basic 
tier. This determination shall be appealable to the Commission pursuant 
to Sec. 76.944. When the Commission is regulating basic service tier 
rates pursuant to Sec. 76.945 or cable programming service rates 
pursuant to Sec. 76.960, an increase in those rates resulting from 
franchise fees or Commission regulatory fees shall be reviewed by the 
Commission pursuant to the mechanisms set forth in Sec. 76.945. A cable 
operator must adjust its rates to reflect decreases in franchise fees 
or Commission regulatory fees within the periods set forth in 
Sec. 76.922(d)(3)(i),(iii).
* * * * *
    (g) * * *
    (5) Notwithstanding paragraphs (a) through (f) of this section, 
when the franchising authority is regulating basic service tier rates, 
a cable operator may increase its rates for basic service to reflect 
the imposition of, or increase in, franchise fees. The increased rate 
attributable to Commission regulatory

[[Page 18979]]

fees or franchise fees shall be subject to subsequent review and refund 
if the franchising authority determines that the increase in basic tier 
rates exceeds the increase in regulatory fees or in franchise fees 
allocable to the basic tier. This determination shall be appealable to 
the Commission pursuant to Sec. 76.944. When the Commission is 
regulating basic service tier rates pursuant to Sec. 76.945 or cable 
programming service rates pursuant to Sec. 76.960, an increase in those 
rates resulting from franchise fees or Commission regulatory fees shall 
be reviewed by the Commission pursuant to the mechanisms set forth in 
Sec. 76.945.
* * * * *
    11. Section 76.950 is revised to read as follows:

Sec. 76.950  Complaints regarding cable programming service rates.

    (a) A franchising authority may file with the Commission a 
complaint challenging the reasonableness of its cable operator's rate 
for cable programming service, or the reasonableness of the cable 
operator's charges for installation or rental of equipment used for the 
receipt of cable programming service. The franchise authority may file 
a complaint with the Commission only upon receipt of more than one 
subscriber complaint made to the franchise authority within 90 days 
after the effective date of the challenged rate increase.
    (b) The Commission shall not review any complaint with respect to 
cable programming services filed after March 31, 1999.
    12. Section 76.951 is revised to read as follows:

Sec. 76.951  Standard complaint form; other filing requirements.

    (a) Any complaint regarding a cable operator's rate for cable 
programming service or associated equipment must be filed using 
standard complaint form, FCC 329.
    (b) The following information must be provided on the standard 
complaint form:
    (1) The name, mailing address and phone number of the franchising 
authority that is filing the complaint;
    (2) The name, mailing address, and FCC community unit identifier of 
the relevant cable operator;
    (3) A description of the cable programming service or associated 
equipment involved and, if applicable, how the service or associated 
equipment has changed;
    (4) The current rate for the cable programming service or 
associated equipment at issue and, if the complainant is challenging 
the reasonableness of a rate increase, the most recent rate for the 
service or associated equipment immediately prior to the rate increase;
    (5) If the complainant is filing a corrected complaint, an 
indication of the date the complainant filed the prior complaint and 
the date the complainant received notification from the Commission that 
the prior complaint was defective;
    (6) A certification that a copy of the complaint, including all 
attachments, is being served contemporaneously via certified mail on 
the cable operator;
    (7) An indication that the complainant franchising authority 
received more than one subscriber complaint within 90 days of the 
operator's imposition of the rate in question; and
    (8) A certification that, to the best of the complainant's 
knowledge, the information provided on the form is true and correct.
    13. Section 76.953 is amended by revising paragraph (a) to read as 
follows:

Sec. 76.953  Limitation on filing a complaint.

    (a) Complaint regarding a rate change. A complaint alleging an 
unreasonable rate for cable programming service or associated equipment 
may be filed against a cable operator only in the event of a rate 
change, including an increase or decrease in rates, or a change in 
rates that results from a change in a system's service tiers. A rate 
change may involve an implicit rate increase (such as deleting channels 
from a tier without a corresponding lowering of the rate for that 
tier). A complaint regarding a rate change for cable programming 
service or associated equipment may be filed against a cable operator 
only in the event of a rate change.
 * * * * *
    14. Section 76.956 is amended by revising paragraph (a) to read as 
follows:

Sec. 76.956  Cable operator response.

    (a) Unless the Commission notifies a cable operator to the 
contrary, the cable operator must file with the Commission a response 
to the complaint filed on the applicable form, within 30 days of the 
date of service of the complaint. The response shall indicate when 
service occurred. Service by mail is complete upon mailing. See 
Sec. 1.47(f) of this chapter. The response shall include the 
information required by the appropriate FCC Form, including rate cards, 
channel line-ups, and an explanation of any discrepancy in the figures 
provided in these documents and the rate filing. The cable operator 
must serve its response on the complainant via first class mail.
* * * * *
    15. Section 76.964 is revised to read as follows:

Sec. 76.964  Written notification of changes in rates and services.

    (a) In addition to the requirement of Sec. 76.309(c)(3)(i)(B) 
regarding advance notification to customers of any changes in rates, 
programming services or channel positions, cable systems shall give 30 
days written notice to both subscribers and local franchising 
authorities before implementing any rate or service change. Such notice 
shall state the precise amount of any rate change and briefly explain 
in readily understandable fashion the cause of the rate change (e.g., 
inflation, changes in external costs or the addition/deletion of 
channels). When the change involves the addition or deletion of 
channels, each channel added or deleted must be separately identified. 
Notices to subscribers shall inform them of their right to file 
complaints about changes in cable programming service tier rates and 
services, shall state that the subscriber may file the complaint within 
90 days of the effective date of the rate change, and shall provide the 
address and phone number of the local franchising authority.
    (b) To the extent the operator is required to provide notice of 
service and rate changes to subscribers, the operator may provide such 
notice using any reasonable means at its sole discretion.
    (c) Notwithstanding any other provision of Part 76, a cable 
operator shall not be required to provide prior notice of any rate 
change that is the result of a regulatory fee, franchise fee, or any 
other fee, tax, assessment, or charge of any kind imposed by any 
Federal agency, State, or franchising authority on the transaction 
between the operator and the subscriber.
    16. Section 76.984 is amended by revising paragraph (c) to read as 
follows:

Sec. 76.984  Geographically uniform rate structure.

* * * * *
    (c) This section does not apply to:
    (1) A cable operator with respect to the provision of cable service 
over its cable system in any geographic area in which the video 
programming services offered by the operator in that area are subject 
to effective competition, or
    (2) Any video programming offered on a per channel or per program 
basis. Bulk discounts to multiple dwelling units shall not be subject 
to this section, except that a cable operator of a cable system that is 
not subject to effective

[[Page 18980]]

competition may not charge predatory prices to a multiple dwelling 
unit. Upon a prima facie showing by a complainant that there are 
reasonable grounds to believe that the discounted price is predatory, 
the cable system shall have the burden of showing that its discounted 
price is not predatory.
    17. A new Sec. 76.1004 is added to subpart O to read as follows:

Sec. 76.1004  Applicability of program access rules to common carriers 
and affiliates.

    Any provision that applies to a cable operator under Secs. 76.1000 
through 76.1003 shall also apply to a common carrier or its affiliate 
that provides video programming by any means directly to subscribers. 
Any such provision that applies to a satellite cable programming vendor 
in which a cable operator has an attributable interest shall apply to 
any satellite cable programming vendor in which such common carrier has 
an attributable interest. For the purposes of this section, two or 
fewer common officers or directors shall not by itself establish an 
attributable interest by a common carrier in a satellite cable 
programming vendor (or its parent company).
    18. A new subpart R is added to read as follows:

Subpart R--Telecommunications Act implementation

Sec. 76.1400  Purpose.
Sec. 76.1401  Effective competition and local exchange carriers.
Sec. 76.1402  CPST rate complaints.
Sec. 76.1403  Small cable operators.
Sec. 76.1404  Use of cable facilities by local exchange carriers.

Subpart R--Telecommunications Act implementation

Sec. 76.1400  Purpose.

    The rules and regulations set forth in this subpart provide 
procedures for administering certain aspects of cable regulation. These 
rules and regulations provide guidance for operators, subscribers and 
franchise authorities with respect to matters that are subject to 
immediate implementation under governing statutes but require specific 
regulatory procedures or definitions.

Sec. 76.1401   Effective competition and local exchange carriers.

    (a) As used in Sec. 76.905(b)(4), the term ``comparable'' 
programming means access to at least 12 channels of programming, at 
least some of which are local television broadcasting signals.
    (b) As used in Sec. 76.905(b)(4), the term ``affiliate'' means a 
person that (directly or indirectly) owns or controls, is owned or 
controlled by, or is under common ownership or control with another 
person. For purposes of the section, the term ``own'' means to own an 
equity interest (or the equivalent thereof) of more than 10 percent.
    (c) An operator meeting the relevant criteria under 
Sec. 76.905(b)(4), may, at any time, file a petition for a 
determination of effective competition with the Commission. The 
petition should set forth information supporting a determination that 
effective competition exists as defined in Sec. 76.905(d)(4).
    (d) Upon filing of a petition described in paragraph (c) of this 
section with the Commission, the operator filing the petition shall 
provide a copy of the petition to the local franchise authority. The 
Commission will issue a public notice of the petition's filing to allow 
interested parties to respond. The Commission may then issue an order 
granting or denying the petition. The Commission may issue an order 
directing one or more persons to produce information relevant to the 
petition's disposition.

Sec. 76.1402   CPST rate complaints.

    (a) A local franchise authority may file rate complaints with the 
Commission within 180 days of the effective date of a rate increase on 
the cable operator's cable programming services tier if within 90 days 
of that increase the local franchise authority receives more than one 
subscriber complaint concerning the increase.
    (b) Before filing a rate complaint with the Commission, the local 
franchise authority must first give the cable operator written notice, 
including a draft FCC Form 329, of the local franchise authority's 
intent to file the complaint. The local franchise authority must give 
an operator a minimum of 30 days to file with the local franchise 
authority the relevant FCC forms that must be filed to justify a rate 
increase or, where appropriate, certification that the operator is not 
subject to rate regulation. The operator must file a complete response 
with the local franchise authority within the time period specified by 
the local franchise authority. The local franchise authority shall file 
with the Commission the complaint and the operator's response to the 
Complaint. If the operator's response to the complaint asserts that the 
operator is exempt from rate regulation, the operator's response can be 
filed with the local franchise authority without filing specific FCC 
Forms.

Sec. 76.1403   Small cable operators.

    (a) Effective February 8, 1996, a small cable operator is exempt 
from rate regulation on its cable programming services tier, or on its 
basic service tier if that tier was the only service tier subject to 
rate regulation as of December 31, 1994, in any franchise area in which 
that operator services 50,000 or fewer subscribers.
    (b) A small cable operator is an operator who, directly or through 
an affiliate, serves in the aggregate fewer than 617,000 subscribers in 
the United States and whose annual revenues, when combined with the 
total annual revenues of all of its affiliates, do not exceed $250 
million in the aggregate.
    (c) As used in this section, an operator shall be deemed affiliated 
with another entity if that entity holds a 20 percent or greater equity 
interest, passive or active, in the operator or exercises de jure or de 
facto control over the operator.
    (d) Procedures. (1) If a small cable operator has only a single 
tier that is subject to regulation, the operator, at any time, may 
certify in writing to its local franchise authority that it meets all 
criteria necessary to qualify as a small operator. Upon request of the 
local franchising authority, the operator shall identify in writing all 
of its affiliates that provide cable service, the total subscriber base 
of itself and each affiliate, and the aggregate gross revenues of its 
cable and non-cable affiliates. Within 90 days of receiving the 
original certification, the local franchising authority shall determine 
whether the operator qualifies for deregulation and shall notify the 
operator in writing of its decision, although this 90-day period shall 
be tolled for so long as it takes the operator to respond to a proper 
request for information by the local franchising authority. If the 
local franchising authority finds that the operator does not qualify 
for deregulation, its notice shall state the grounds for that decision. 
The operator may appeal the local franchising authority's decision to 
the Commission within 30 days.
    (2) Once the operator has certified its eligibility for 
deregulation on the basic service tier, the local franchising authority 
shall not prohibit the operator from taking a rate increase and shall 
not order the operator to make any refunds unless and until the local 
franchising authority has rejected the certification in a final order 
that is no longer subject to appeal or that the Commission has 
affirmed. The operator shall be liable for refunds for revenues gained 
(beyond revenues that could be gained under regulation) as a result of 
any rate increase taken during the period in which it claimed to be 
deregulated, plus interest, in the event the operator is later

[[Page 18981]]

found not to be deregulated. The one-year limitation on refund 
liability will not be applicable during that period to ensure that the 
filing of an invalid small operator certification does not reduce any 
refund liability that the operator would otherwise incur.
    (3) Within 30 days of being served with a local franchising 
authority's notice that the local franchising authority intends to file 
a cable programming services tier rate complaint, an operator may 
certify to the local franchising authority that it meets the criteria 
for qualification as a small cable operator. This certification shall 
be filed in accordance with the cable programming services rate 
complaint procedure set forth in Sec. 76.1402. Absent a cable 
programming services rate complaint, the operator need not file for 
small cable operator certification in order to treat its cable 
programming services tier as deregulated.
    (4) If a pending CPST rate complaint was filed with the Commission 
before April 30, 1996 the operator should file its certification of 
small cable operator status directly with the Commission within 15 days 
of that date.

Sec. 76.1404   Use of cable facilities by local exchange carriers.

    For purposes of Sec. 76.505(d)(2), the Commission will determine 
whether use of a cable operator's facilities by a local exchange 
carrier is reasonably limited in scope and duration according to the 
following procedures:
    (a) Within 10 days of final execution of a contract permitting a 
local exchange carrier to use that part of the transmission facilities 
of a cable system extending from the last multi-user terminal to the 
premises of the end use, the parties shall submit a copy of such 
contract, along with an explanation of how such contract is reasonably 
limited in scope and duration, to the Commission for review. The 
parties shall serve a copy of this submission on the local franchising 
authority, along with a notice of the local franchising authority's 
right to file comments with the Commission consistent with Sec. 76.7.
    (b) Based on the record before it, the Commission shall determine 
whether the local exchange carrier's use of that part of the 
transmission facilities of a cable system extending from the last 
multi-use terminal to the premises of the end user is reasonably 
limited in scope and duration. In making this determination, the 
Commission will evaluate whether the proposed joint use of cable 
facilities promotes competition in both services and facilities, and 
encourages long-term investment in telecommunications infrastructure.

[FR Doc. 96-10173 Filed 4-26-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-10104 National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List
[Federal Register Volume 61, Number 84 (Tuesday, April 30, 1996)]
[Rules and Regulations]
[Page 18968]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10104]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300

[FRL-5461-3]

National Oil and Hazardous Substances Pollution Contingency Plan 
National Priorities List

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of Deletion Amnicola Dump Superfund Site Chattanooga, 
Tennessee from the National Priorities List.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) Region 4 announces 
the deletion of the Amnicola Dump Superfund Site from the National 
Priorities List (NPL), Appendix B of 40 CFR Part 300 which is the 
National Oil and Hazardous Substances Pollution Contingency Plan (NCP). 
EPA and the State have determined that all appropriate Fund-financed 
responses under the Comprehensive Environmental Response, Compensation, 
and Liability Act (CERCLA), as amended, have been implemented and that 
no further cleanup is appropriate. Moveover, EPA and the State have 
determined that remedial actions conducted at the site to date have 
been protective of public health, welfare and the environment. This 
deletion does not preclude future action under Superfund.

EFFECTIVE DATE: May 15, 1996.

FOR FURTHER INFORMATION CONTACT: Robert West, Remedial Project Manager, 
U.S. Environmental Protection Agency, Region 4, North Superfund 
Remedial Branch, 345 Courtland Street, N.E., Atlanta, Georgia 30365, 
(404) 347-7791, extension 2033.

SUPPLEMENTARY INFORMATION: The Site to be deleted from the NPL is: 
Amnicola Dump Superfund Site in Chattanooga, Tennessee.
    A Notice of Intent to Delete for this site was published on 
February 22, 1996, (FR-5436-5). The closing date for comments on the 
Notice of Intent to Delete was March 22, 1996. EPA received no 
comments.
    EPA identifies sites that appear to present a significant risk to 
the public health, welfare and the environment and it maintains the NPL 
as the list of those sites. Any site deleted from the NPL remains 
eligible for Fund-financed remedial actions in the future. Section 
300.425(e)(3) of the NCP states that Fund-financed actions may be taken 
at sites deleted from the NPL. Deletion of a site from the NPL does not 
affect responsible party liability or impede agency efforts to recover 
costs associated with response efforts.

List of Subjects in 40 CFR Part 300

    Environmental protection, Air pollution control, Chemicals, 
Hazardous Waste, Hazardous substances, Intergovernmental relations, 
Penalties, Reporting and recordkeeping requirements, Superfund, Water 
pollution control, and Water supply.

    Dated: April 4, 1996
Phyllis P. Harris,
Acting Deputy Regional Administrator, U.S. EPA Region 4.

    For reasons set out in the preamble, 40 CFR Part 300 is amended as 
follows:

PART 300--[AMENDED]

    The authority citation for Part 300 continues to read as follows:

    Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 
12777, 56 FR 54757, 3 CFR 1991 Comp., p 351; E.O. 12580, 52 FR 2923; 
3 CFR, 1987 Comp., p. 193.

Appendix B--[Amended]

    2. Table 1 of Appendix B to Part 300 is amended by removing the 
Amnicola Dump Superfund Site, Chattanooga, Tennessee.
[FR Doc. 96-10104 Filed 4-29-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

Setzen Sie Ihre Recherche in ChatGPT oder Claude fort

Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.