Part III - Administrative, Procedural, and Miscellaneous

Qualifying Advanced Coal Project Program

Notice 2007-52

SECTION 1. PURPOSE

This notice updates the procedures for the allocation of credits under the
qualifying advanced coal project program of § 48A of the Internal Revenue Code and
defines certain terms for purposes of § 48A. The purpose of the qualifying advanced
coal project program is the deployment of advanced coal-based generation
technologies. To further this purpose, the method of allocation is being modified for
allocation rounds after 2006. Under the modified method of allocation, the U.S.
Department of Energy (“DOE”) will rank a certified project relative to other certified
projects in each pool and credits will be allocated to projects based on the DOE ranking.
The modified allocation method will substantially favor projects that capture and
sequester carbon dioxide emissions and will favor to a lesser extent projects optimized
for future carbon dioxide capture.
SECTION 2. BACKGROUND AND CHANGES
.01 Section 46 provides that the amount of the investment credit for any taxable
year is the sum of the credits listed in § 46. That list includes the qualifying advanced
coal project credit.

2
.02 The qualifying advanced coal project credit is provided under § 48A.
Section 48A(a) provides that the qualifying advanced coal project credit for a
taxable year is an amount equal to (1) 20 percent of the qualified investment (as
defined in § 48A(b)) for that taxable year in certified qualifying advanced coal
projects (as defined in § 48A(c)(1) and (e)) using an integrated gasification
combined cycle (IGCC) (as defined in § 48A(c)(7)), and (2) 15 percent of the
qualified investment for that taxable year in other certified qualifying advanced
coal projects.
.03 Section 48A(d)(3)(A) provides that the aggregate credits allowed
under § 48A(a) may not exceed $1.3 billion. Section 48A(d)(3)(B) provides that
(i) $800 million of credits are to be allocated to IGCC projects, and (ii) $500
million of credits are to be allocated to projects that use other advanced coal-
based generation technologies (as defined in § 48A(c)(2) and (f)).
.04 Section 48A(e)(3)(A) provides that the credits for IGCC projects must
be allocated in accordance with the procedures set forth in § 48A(d), and in
relatively equal amounts to (i) projects using bituminous coal as a primary
feedstock, (ii) projects using subbituminous coal as a primary feedstock, and (iii)
projects using lignite as a primary feedstock. Further, § 48A(e)(3)(B) provides
that IGCC projects that include (i) greenhouse gas capture capability (as defined
in § 48A(c)(5)), (ii) increased by-product utilization, and (iii) other benefits must
be given high priority in the allocation of credits for IGCC projects.
.05 Section 48A(f) prescribes the requirements that must be satisfied to
qualify as an advanced coal-based generation technology. These include

3
requirements that the unit be designed to attain specified standards for emissions
or removal of certain pollutants. As originally enacted, § 48A(f) required that a
unit be designed to achieve 99-percent removal of sulfur dioxide. Section 203(a)
of the Tax Relief and Health Care Act of 2006, Pub. L. 109-432, 120 Stat. 2922
(December 20, 2006), modified this test for units designed for the use of
feedstock substantially all of which is subbituminous coal. Such a unit satisfies
the modified test if it achieves either 99-percent removal of sulfur dioxide or an
emission level of not more than 0.04 pounds of sulfur dioxide per million Btu,
determined on a 30-day average.
.06 The at-risk rules in § 49 and the recapture and other special rules in
§ 50 apply to the qualifying advanced coal project credit. Further, the qualifying
advanced coal project credit generally is allowed in the taxable year in which the
eligible property (as defined in § 48A(c)(3)) is placed in service (as defined in
section 3.04 of this notice) by the taxpayer. Pursuant to § 48A(d)(2)(E), a
taxpayer that receives a certification under § 48A(d)(2)(D) has 5 years from the
date of issuance of the certification to place the qualifying advanced coal project
in service.
.07 Section 48A(d)(1) provides that the Secretary, in consultation with the
Secretary of Energy, shall establish a qualifying advanced coal project program
for the deployment of advanced coal-based generation technologies. The
Treasury Department and the Internal Revenue Service established this program
in Notice 2006-24, 2006-11 I.R.B. 595.
.08 This notice modifies the qualifying advanced coal project program

4
established in Notice 2006-24 in a number of respects. The significant changes
made by this notice include the following:
(1) The Large and Mid-Size Business Division (LMSB) of the Service will
allocate the advanced coal project credits and issue the certification under
§ 48A(d)(2). The filing instructions in section 5.04 provide LMSB addresses to
reflect this change.
(2) Section 3 defines certain terms for purposes of § 48A.
(3) The method of allocation is modified for allocation rounds after 2006.
Under the modified method of allocation, the DOE will rank a certified project
relative to other certified projects in each pool and credits will be allocated to
projects based on the DOE ranking. The modified allocation method will
substantially favor projects that capture and sequester carbon dioxide emissions
and will favor to a lesser extent projects optimized for future carbon dioxide
capture. Sections 4.02(3) and (4) reflect this change in the method by which
credits under § 48A are allocated to projects.
(4) Section 4.02(8) provides that the period for submitting the application
for § 48A certification (i) ends on March 3, 2008, for the 2007-08 allocation round
and (ii) begins on March 4, 2008, and ends on March 2, 2009, for the 2008-09
allocation round. Changes also are made to the dates in sections 4.02(10) and
(11) for accepting or rejecting a taxpayer’s application for § 48A certification and
for executing closing agreements.
(5) Section 4.02(9) provides that the due date for the application for
DOE certification is October 31, that DOE will rank certified projects, and that the

5
due date for the DOE certification and ranking is March 1. Section 4.02(9) also
clarifies that the DOE certification and ranking (for projects determined to be
feasible) are provided to the Service.
(6) Section 4.02(11) provides that a successor in interest must execute a
new closing agreement with the Service no later than the due date (including
extensions) of the successor in interest’s Federal income tax return for the
taxable year in which the transfer occurs.
(7) The information required to be included in the application for DOE
certification is modified. Section 5.02 requires submission of additional
information regarding the number and types of turbines to be used in the project
and with respect to the sulfur dioxide removal. Appendix B provides additional
information regarding program policy factors. Applicants will no longer be
required to submit independent financial reports.
(8) Section 5.02(13) defines the term “substantially all” for purposes of
determining whether a project’s subbituminous coal usage qualifies it for the
modified sulfur dioxide removal test provided in § 48A(f)(1).
(9) Section 5.03 requests that a taxpayer submit with the application for
§ 48A certification a declaration consenting to the disclosure by the Service of
certain return information if the taxpayer is awarded an allocation of qualifying
advanced coal project credits. The form of the declaration is set forth in
Appendix C.
(10) Sections 5.03(1) and 5.04 require that a taxpayer submit one paper
copy and one electronic version on a floppy disc or a CD of the application for

6
§ 48A certification (including the application for DOE certification).
(11) Section 7.02 provides more details on who may sign the penalties
of perjury statement.
(12) Section 7.03 provides that the Service and the DOE must be
informed if the plans for the project change in any significant respect from the
plans set forth in the applications for § 48A and DOE certification, and also
provides the consequences of any significant change to the plans set forth in the
applications.
(13) Section 7.06 provides that the DOE will offer debriefings to
applicants that submitted an application for DOE certification.
(14) Section 10 provides guidance regarding Freedom of Information Act
requests for records relating to the qualifying advanced coal project program.
SECTION 3. DEFINITIONS
The following definitions apply for purposes of § 48A and this notice:
.01 Coal
. Section 48A(c)(4) defines the term “coal” as meaning anthracite,
bituminous coal, subbituminous coal, lignite, and peat. Coal includes waste coal
(that is, usable material that is a byproduct of the previous processing of
anthracite, bituminous coal, subbituminous coal, lignite, or peat). Examples of
waste coal include fine coal of any of the listed ranks, coal of any of the listed
ranks obtained from a refuse bank or slurry dam, anthracite culm, bituminous
gob, and lignite waste.
.02 Total Nameplate Generating Capacity
.
(1) Except as provided in section 3.02(2) of this notice, the total

7
nameplate generating capacity of a project is the aggregate of the numbers (in
megawatts) stamped on the nameplate of each generator to be used in the
project.
(2) If the number stamped on the nameplate of a generator is not
determined at the International Standard Organization (ISO) optimal conditions of
59 degrees Fahrenheit, 60% relative humidity, and 14.7 psia at sea level, the
number stamped on the nameplate is disregarded and the generator’s capacity
(in megawatts) determined at such optimal conditions is used in its place.
.03 Fuel Input
.
(1) In general. The term “fuel input” means, with respect to any type of
fuel, the amount of such fuel used during normal plant operations. The amounts
of the fuel used are measured (i) in British thermal units (Btus) on an energy
input basis and (ii) pursuant to applicable standards prescribed by the American
Society for Testing and Materials (ASTM). For example, § 48A(e)(1)(B) provides
that the fuel input for the project, when completed, must be at least 75 percent
coal. This requirement is satisfied if, after completion and during normal plant
operations, coal provides 75 percent of the project’s fuel measured in Btus on an
energy input basis and pursuant to applicable ASTM standards.
(2) Only normal plant operations taken into account
. Only fuel used
during normal plant operations is taken into account for purposes of § 48A and
sections 5.02(5) and 5.02(13) of this notice. Normal plant operations are
operations other than during periods of initial plant certification, plant startup,
plant shutdown, integrated gasifier shutdown for gasification system

8
maintenance, or interruption of the coal supply to the project resulting from an
event of force majeure (including an act of God, war, strike, or other similar event
beyond the control of the taxpayer). For example, the fuel input during the initial
plant certification may consist entirely of natural gas or other non-coal fuels
because fuel used during initial plant certification is disregarded in determining
whether the 75-percent coal usage requirement of § 48A(e)(1)(B) is satisfied.
.04 Placed In Service
. For purposes of § 48A, property is placed in
service in the taxable year in which the property is placed in a condition or state
of readiness and availability for a specifically assigned function. See
§ 1.46-
3(d)(1)(ii) of the Income Tax Regulations. Thus, a qualifying advanced coal
project or eligible property (as defined in § 48A(c)(3)) that is a part of the project
is placed in service in the taxable year in which the project is placed in a
condition or state of readiness and availability for producing electricity from coal.
SECTION 4. QUALIFYING ADVANCED COAL PROJECT PROGRAM
.01 In General
. The Service will consider a project under the qualifying
advanced coal project program only if the DOE provides a certification (“DOE
certification”) and ranking (if any) for the project. Accordingly, a taxpayer must
submit, for each qualifying advanced coal project: (1) an application for
certification by the DOE (“application for DOE certification”), and (2) an
application for certification under § 48A(d)(2) by the Service (“application for
§ 48A certification”). Both applications may be submitted only during the 3-year
period beginning on February 21, 2006. Certifications will be issued and credits
will be allocated to projects in annual allocation rounds. The initial allocation

9
round was conducted in 2006. Additional allocation rounds will be conducted in
2007-08 and, if necessary, in 2008-09.
.02 Program Specifications
.
(1) The Service determines the amount of the qualifying advanced coal
project credits allocated to a qualifying advanced coal project at the time the
Service accepts the application for § 48A certification for that project in
accordance with section 4.02(10) of this notice (see section 5 of this notice for
the requirements applicable to the application for DOE certification and the
application for § 48A certification).
(2) The qualifying advanced coal project credits of $1.3 billion and the
applications for certification are separated into the following four pools:
(a) Projects using an advanced coal-based generation technology
other than IGCC. The aggregate amount of qualifying advanced coal project
credit for this pool is $500 million. The maximum amount of credits that will be
allocated to a project is $125 million. In the 2006 allocation round, $250 million
of credits was allocated from this pool. Therefore, $250 million of credits is
available for allocation from this pool in 2007-08.
(b) IGCC projects using bituminous coal as a primary feedstock. The
aggregate amount of qualifying advanced coal project credit for this pool is $267
million. The maximum amount of credits that will be allocated to a project is
$133.5 million. In the 2006 allocation round, $267 million of credits (the entire
amount available) was allocated from this pool. Accordingly, no allocation round
for this pool will be conducted in 2007-08.

10
(c) IGCC projects using subbituminous coal as a primary feedstock.
The aggregate amount of qualifying advanced coal project credit for this pool is
$267 million. The maximum amount of credits that will be allocated to a project is
$133.5 million. In the 2006 allocation round, no credits were allocated from this
pool. Therefore, $267 million of credits is available for allocation from this pool in
2007-08.
(d) IGCC projects using lignite as a primary feedstock. The aggregate
amount of qualifying advanced coal project credit for this pool is $266 million.
The maximum amount of credits that will be allocated to a project is $133 million.
In the 2006 allocation round, $133 million of credits was allocated from this pool.
Accordingly, $133 million of credits is available for allocation from this pool in
2007-08.
(3) For projects using an advanced coal-based generation technology
other than IGCC, DOE will rank the certified projects in descending order (that is,
first, second, third, etc.) and the $250 million available for allocation will be
allocated as follows in the allocation round in 2007-08:
(a) If the requested allocation of credits for projects that DOE has
certified for this pool does not exceed the amount available for allocation, each
certified project will be allocated the full amount of credit requested.
(b) If the requested allocation of credits for projects that DOE has
certified for this pool exceeds the amount available for allocation, the amount
available for allocation will be allocated as follows:
(i) The project receiving the highest ranking (that is, first) will be

11
allocated the full amount of credit requested (but not exceeding the amount
available for allocation) before any credit is allocated to a lower-ranked project.
The amount available for allocation is reduced by the amount of credit so
allocated and only the remainder is available for allocation to a lower-ranked
project.
(ii) Second and lower-ranked projects will be entitled to similar
priority in the allocation of credits and allocations to such projects will similarly
reduce the remainder of the amount available for allocation until the amount
available for allocation from the pool is exhausted.
(4) For each IGCC pool described in section 4.02(2)(c) or (d) of this
notice, DOE will rank the certified projects in descending order (that is, first,
second, third, etc.) and the amount available for allocation from the pool will be
allocated as follows in the allocation round in 2007-08:
(a) If the requested allocation of credits for projects that DOE has
certified for an IGCC pool described in section 4.02(2)(c) or (d) of this notice
does not exceed the amount available for allocation from that pool, each certified
project will be allocated the full amount of credit requested.
(b) If the requested allocation of credits for projects that DOE has
certified for an IGCC pool described in section 4.02(2)(c) or (d) of this notice
exceeds the amount available for allocation from that pool, the amount available
for allocation will be allocated as follows:
(i) The project receiving the highest ranking (that is, first) will be
allocated the full amount of credit requested (but not exceeding the amount

12
available for allocation from the pool) before any credit is allocated to a lower-
ranked project. The amount available for allocation from the pool is reduced by
the amount of credit so allocated and only the remainder is available for
allocation to a lower-ranked project.
(ii) Second and lower-ranked projects will be entitled to similar
priority in the allocation of credits and allocations to such projects will similarly
reduce the remainder of the amount available for allocation from the pool until the
amount available for allocation from the pool is exhausted.
(5) If the amount available for allocation from a pool is not fully allocated
in the 2007-08 allocation round, a similar allocation round will be conducted in
2008-09. Generally, the results of each year will be announced. See section
5.03(2) of this notice for further information about this announcement.
(6) If the same project would otherwise be allocated credits under both
the qualifying advanced coal project program under this notice and the qualifying
gasification project program under Notice 2007-53, 2007-26 I.R.B. ___, the
following rules apply:
(a) The qualifying gasification project credit may not be allocated to the
project with respect to any qualified investment under § 48B for which a
qualifying advanced coal project credit is allowed under § 48A; and
(b) The qualifying gasification project credit may be allocated to the
project with respect to the qualified investment under § 48B for which a qualifying
advanced coal project credit is not allowed under § 48A.
(7) For each allocation round there will be an annual application period

13
during which a taxpayer may file its application for § 48A certification. The
Service will consider a project in an allocation round only if the application for
§ 48A certification for the project is submitted during the application period for
that round and the DOE provides the DOE certification and the DOE ranking (if
any) for the project before the end of the application period.
(8) For the allocation round conducted in 2007-08, the application period
begins on October 3, 2006, and ends on March 3, 2008, and any completed
application for § 48A certification received by the Service after October 2, 2006,
and before March 4, 2008, will be deemed to be submitted by the taxpayer on
March 3, 2008. For the allocation round to be conducted in 2008-09, the
application period begins on March 4, 2008, and ends on March 2, 2009, and any
completed application for § 48A certification received by the Service after March
3, 2008, and before March 3, 2009, will be deemed to be submitted by the
taxpayer on March 2, 2009. For purposes of this notice, an application that is
submitted by U.S. mail will be treated as received by the Service on the date of
the postmark and an application submitted by a private delivery service will be
treated as received by the Service on the date recorded or the date marked in
accordance with § 7502(f)(2)(C).
(9) See section 5.02 of this notice and Appendix B to this notice for the
information to be submitted to the DOE in an application for DOE certification.
Appendix B to this notice also provides the instructions and address for filing the
application for DOE certification. The DOE will determine the feasibility of the
project and, if the project is determined to be feasible, will provide a DOE

14
certification for the project to the Service. If the DOE certifies two or more
projects in a pool described in section 4.02(2) of this notice, the DOE also will
rank each of the projects it certifies (for example, first, second, third, etc.) relative
to other certified projects in the same pool. If an application for DOE certification
is postmarked on or before October 31 of a calendar year, the DOE will
determine the feasibility of the project and (for projects determined to be feasible)
provide the DOE certification and the DOE ranking (if any) to the Service by
March 1 of the year following that calendar year.
(10) By April 30 of the calendar year in which an application for § 48A
certification is deemed to be submitted (as determined under section 4.02(8) of
this notice), the Service will accept or reject the taxpayer’s application for § 48A
certification and will notify the taxpayer, by letter, of its decision.
(11) If the taxpayer’s application for § 48A certification is accepted, the
acceptance letter will state the amount of the credit allocated to the project. If a
credit is allocated to a taxpayer’s project, the taxpayer will be required to execute
a closing agreement in the form set forth in Appendix A to this notice. By June
30 of the calendar year in which an application for § 48A certification is accepted,
the taxpayer must execute and return the closing agreement to the Service at the
appropriate address listed in section 5.04 of this notice or listed in later guidance
published in the Internal Revenue Bulletin. The Service will execute and return
the closing agreement to the taxpayer by August 31 of such calendar year. The
executed closing agreement applies only to the accepted taxpayer. Accordingly,
any successor in interest must execute a new closing agreement with the Service

15
no later than the due date (including extensions) of the successor in interest’s
Federal income tax return for the taxable year in which the transfer occurs. If the
successor in interest does not execute a new closing agreement, the following
rules apply:
(a) In the case of an interest acquired at or before the time the
qualifying advanced coal project is placed in service, any credit allocated to the
project will be fully forfeited (and rules similar to the recapture rules of § 50(a)
apply with respect to qualified progress expenditures); and
(b) In the case of an interest acquired after the qualifying advanced
coal project is placed in service, the project ceases to be investment credit
property and the recapture rules of § 50(a) (and similar rules with respect to
qualified progress expenditures) apply.
SECTION 5. APPLICATIONS FOR CERTIFICATIONS
.01 In General
. An application for § 48A certification and a separate
application for DOE certification must be submitted for each qualifying advanced
coal project. If an application for DOE certification does not include all of the
information required by section 5.02 of this notice and meet the requirements in
sections 7.01 and 7.02 of this notice, the DOE may decline to accept the
application. If an application for § 48A certification does not include all of the
information listed in section 5.03(1) of this notice and meet the requirements in
sections 7.01 and 7.02 of this notice, the application will not be accepted by the
Service.
.02 Information Required in the Application for DOE Certification
. An

16
application for DOE certification must include all of the information requested in
Appendix B to this notice and all of the following:
(1) The name, address, and taxpayer identification number of the
taxpayer. If the taxpayer is a member of an affiliated group filing consolidated
returns, also provide the name, address, and taxpayer identification number of
the common parent of the group.
(2) The name and telephone number of a contact person.
(3) The name and address (or other unique identifying designation) of
the qualifying advanced coal project.
(4) A statement specifying whether the project is an IGCC project or a
qualifying advanced coal project that uses another advanced coal-based
technology.
(5) In the case of an IGCC project, a statement specifying the type of
coal (bituminous coal, subbituminous coal, or lignite) that will be the primary
feedstock. An application for DOE certification with respect to an IGCC project
will not be considered unless one of these types of coal is the primary feedstock.
For purposes of § 48A(e)(3)(A), a type of coal is the primary feedstock only if at
all times more than 50 percent of the cumulative total fuel input (coal and any
other fuel input) used in normal plant operations (as defined in section 3.03(2) of
this notice) of the project will consist of that type of coal.
(6) The estimated total cost of the project and the estimated total
qualified investment in the eligible property that will be part of the project.
(7) The amount of the qualifying advanced coal project credit requested

17
for the project. The amount requested must not exceed the maximum amount
provided in section 4.02(2) of this notice.
(8) If the taxpayer is or will be requesting an amount of the qualifying
gasification project credit under § 48B for the same project, a statement
specifying the amount of credit the taxpayer is or will be requesting under § 48B.
(9) A statement specifying whether the project is a new electric
generation unit (as defined in § 48A(c)(6)), a retrofit of an existing electric
generation unit, or a repower of an existing electric generation unit.
(10) In the case of an IGCC project, a statement specifying whether the
project is entitled to priority for greenhouse gas capture capability (as defined in
§ 48A(c)(5)) or increased by-product utilization and, if entitled to priority, a
statement identifying which of these priorities apply to the IGCC project.
(11) A statement specifying the number and types of generators to be
used in the project (for example, two combustion turbine generators and one
steam turbine generator).
(12) The exact total nameplate generating capacity (as defined in
section 3.02 of this notice) of the project.
(13) In the case of a project that will not achieve 99-percent removal of
sulfur dioxide, a statement that the project is designed for the use of a feedstock
substantially all of which is subbituminous coal and will achieve an emission level
of not more than 0.04 pounds of sulfur dioxide per million Btu, determined on a
30-day average. For this purpose, a project is designed for the use of feedstock
substantially all of which is subbituminous coal if at all times 80 percent or more

18
of the cumulative total fuel input (coal and any other fuel input) used in normal
plant operations (as defined in section 3.03(2) of this notice) of the project will be
subbituminous coal. Such a project meets the requirements in § 48A(f)(1) by
achieving either 99-percent removal of sulfur dioxide or an emission level of not
more than 0.04 pounds of sulfur dioxide per million Btu, determined on a 30-day
average. All other qualifying advanced coal projects must achieve 99-percent
removal of sulfur dioxide.
.03 Information To Be Included in the Application for § 48A Certification
.
(1) Information required in the application for § 48A certification.
Pursuant to § 48A(d)(2)(B), an application for § 48A certification must include all
of the following:
(a) The name, address, and taxpayer identification number of the
taxpayer. If the taxpayer is a member of an affiliated group filing consolidated
returns, also provide the name, address, and taxpayer identification number of
the common parent of the group.
(b) The name, telephone number, and fax number of a contact person.
For such person, attach a properly executed power of attorney, preferably on
Form 2848, Power of Attorney and Declaration of Representative
.
(c) One paper copy and one electronic version on a floppy disc or a
CD of the completed application for DOE certification submitted with respect to
the project in accordance with section 5.02 of this notice.
(2) Consent to disclosure of allocation
. In order to provide the public
with information on how the qualifying advanced coal project credits authorized

19
by Congress have been allocated and facilitate oversight of the qualifying
advanced coal project program, the Service intends to publish the results of the
allocation process. The Service expects that a list identifying the taxpayers and
projects to which credits are allocated and specifying the amount of credit
allocated to each would be of particular interest to the public. Pursuant to
§ 6103, consent is required in order to disclose any return information with
respect to taxpayers awarded an allocation. Therefore, the Service requests that
each taxpayer submit with the application for § 48A certification a declaration,
consenting to the disclosure by the Service of the following return information in
the event a qualifying advanced coal project credit is allocated to the taxpayer’s
project: (a) the name of the taxpayer; (b) if the taxpayer is a member of an
affiliated group filing consolidated returns, the name of the common parent of the
group; (c) the type and location of the project to which the application relates;
and (d) the amount of the qualifying advanced coal project credit allocated to the
project. To provide a valid consent, the declaration must be in the form set forth
in Appendix C. A taxpayer is not required to consent to disclosure of this
information in order to receive an allocation of the qualifying advanced coal
project credit, and neither the presence nor the absence of such a consent will be
taken into account in the evaluation of a taxpayer’s application. The Service will
not publish any return information relating to a taxpayer if the taxpayer does not
consent to disclosure of this information or does not receive an allocation of the
qualifying advanced coal project credit.
.04 Instructions and Address for Filing § 48A Application
. One paper

20
copy and one electronic version on a floppy disc or a CD of the application for
§ 48A certification must be submitted. Applications for § 48A certification should
be marked: SECTION 48A APPLICATION FOR CERTIFICATION. There is no
user fee for these applications.
(1) Applications submitted by U.S. mail must be sent to:

Internal Revenue Service
Industry Director, Natural Resources and Construction
Attn: Executive Assistant
1919 Smith Street
Stop HOU 1000
Houston, TX 77002

Applications submitted by a private delivery service must be sent to:
Internal Revenue Service
Industry Director, Natural Resources and Construction
Attn: Executive Assistant
1919 Smith Street, Floor P2
Stop HOU 1000
Houston, TX 77002

(2) Applications may also be hand delivered Monday through Friday
between the hours of 8 a.m. and 4 p.m. Central time to:
Internal Revenue Service
Industry Director, Natural Resources and Construction
Attn: Executive Assistant
1919 Smith Street, Floor P2
Stop HOU 1000
Houston, TX 77002

SECTION 6. ISSUANCE OF CERTIFICATION
.01 In General
. Section 48A(d)(2)(D) provides that a taxpayer shall have 2
years from the date of acceptance of the § 48A application during which to
provide evidence that the criteria set forth in § 48A(e)(2) have been met.
Pursuant to § 48A(e)(2), a project shall be eligible for certification only if (A) the

21
taxpayer has received all federal and state environmental authorizations or
reviews necessary to commence construction of the project, and (B) the
taxpayer, except in the case of a retrofit or repower of an existing generation unit,
has purchased or entered into a binding contract for the purchase of the main
steam turbine or turbines for the project, except that this contract may be
contingent upon receipt of a certification under § 48A(d)(2). Section 48A(d)(2)(E)
provides that a taxpayer that receives a certification has 5 years from the date of
issuance of the certification to place the project in service and that the
certification is void if the project is not placed in service by the end of that five-
year period.
.02 Requirements for Certification
. Within 2 years from the date that the
Service accepts the taxpayer’s application for § 48A certification under section
4.02(10) of this notice, the taxpayer must submit to the Service documentation
establishing that the requirements of § 48A(e)(2) are satisfied. See also sections
7.01 and 7.02 of this notice for other requirements that must be satisfied. The
taxpayer should mark the package “SECTION 48A CERTIFICATION
REQUIREMENTS” and send it to the appropriate address listed in section 5.04 of
this notice or listed in later guidance published in the Internal Revenue Bulletin.
.03 Service’s Action on Certification
. After receiving the material in section
6.02 of this notice, the Service will decide whether or not to certify the project and
will notify the taxpayer, by letter, of that decision. If the Service certifies the
project, the date of this letter is the date of issuance of the certification.
SECTION 7. OTHER REQUIREMENTS

22
.01 Signature. Each submission under sections 5 and 6 of this notice
must be signed and dated by the taxpayer. A stamped signature or faxed
signature is not permitted.
.02 Penalties of Perjury Statement
.
(1) Each submission under sections 5 and 6 of this notice must be
accompanied by the following declaration: “Under penalties of perjury, I declare
that I have examined this submission, including accompanying documents, and,
to the best of my knowledge and belief, all of the facts contained herein are true,
correct, and complete.”
(2) The declaration must be signed and dated by the taxpayer. The
person signing for the taxpayer must have personal knowledge of the facts.
Further, the declaration must be signed by an officer on behalf of a corporation, a
general partner on behalf of a state-law partnership, a member-manager on
behalf of a limited liability company, a trustee on behalf of a trust, and the
proprietor in the case of a sole proprietorship. If the taxpayer is a member of an
affiliated group filing consolidated returns, the declaration also must be signed by
a duly authorized officer of the common parent of the group. A stamped
signature or faxed signature is not permitted.
.03 Significant Change in Plans
. The Service and DOE must be informed
if the plans for the project change in any significant respect from the plans set
forth in the applications for § 48A and DOE certification. Any significant change
to the plans set forth in the applications will have the following effects:
(1) The Service will disregard any certification or ranking provided by

23
DOE unless DOE is informed of the change before the date on which DOE
provides the certification or ranking (that is, the Service will not consider the
project unless DOE provides a new, timely certification and ranking (if any) on or
after the date on which DOE is informed of the change); and
(2) Any acceptance provided by the Service and any allocation or
certification based on that acceptance will be void unless the Service is informed
of the change before the date on which the acceptance is provided under section
4.02(10) of this notice.
.04 Effect of an Acceptance, Allocation, or Certification
. An acceptance,
allocation, or certification by the Service under this notice is not a determination
that a project qualifies for the qualifying advanced coal project credit under
§ 48A. The Service may, upon examination (and after any appropriate
consultation with DOE), determine that the project does not qualify for this credit.
.05 No Right to a Conference or Appeal
. A taxpayer does not have a right
to a conference relating to any matters under this notice. Further, a taxpayer
does not have a right to appeal the decisions made under this notice (including
the acceptance or rejection of the application for DOE or § 48A certification, the
amount of credit allocated to the project, or whether or not to certify the project)
to an Associate Chief Counsel or any other official of the Service.
.06 DOE Debriefings
. Although a taxpayer does not have a right to a
conference relating to any matters under this notice, the DOE will offer
debriefings to all applicants that submitted an application for DOE certification.
This debriefing will be held by the DOE after the Service has accepted the

24
applications for § 48A certification (as determined under section 4.02(10) of this
notice). The sole purpose of the debriefing is to enable applicants to develop
better proposals in future allocation rounds by providing DOE’s review of the
strengths and weaknesses of their application for DOE certification.
SECTION 8. REVIEW AND REDISTRIBUTION
.01 In General
. Section 48A(d)(4)(A) provides that the credits allocated
under § 48A must be reviewed not later than August 8, 2011. Pursuant to
§ 48A(d)(4)(B), credits available under § 48A(d)(3)(B)(i) and (ii) may be
reallocated if (i) there is an insufficient quantity of qualifying applications for
certification pending at the time of the review; or (ii) any certification made
pursuant to § 48A(d)(2) has been revoked pursuant to § 48A(d)(2)(D). If credits
under § 48A(d)(3)(B)(i) and (ii) are available for reallocation, § 48A(d)(4)(C)
authorizes the conduct of an additional program for applications for certification.
.02 Review and Redistribution of Credits
.
(1) In general. If, after the allocation round in 2008-09, the entire credit
for a pool is not fully subscribed (that is, the aggregate credit for the pool has not
been fully allocated), the remaining credits from that pool will be reallocated to
pools that have been fully subscribed. Credits from pools not fully subscribed will
be reallocated to fully subscribed pools in proportion to the aggregate amounts of
credit specified for the fully subscribed pools in section 4.02(2) of this notice.
Future guidance will prescribe the procedures applicable to applications for
certification with respect to the reallocated credits.
(2) Reduction or forfeiture of allocated credits
. Under the closing

25
agreement set forth in Appendix A to this notice, the qualifying advanced coal
project credits allocated under section 4 of this notice will be reduced or forfeited
in certain situations. A taxpayer must notify the Service of the amount of any
reduction or forfeiture required under the closing agreement. This notification
must be sent to the appropriate address listed in section 5.04 of this notice or
listed in later guidance published in the Internal Revenue Bulletin.
The amount of any reduction or forfeiture of the allocated credits will be
returned to the appropriate allocation pool and included in the aggregate credit
remaining to be allocated in the allocation round following the reduction or
forfeiture. If the reduction or forfeiture occurs after the allocation round in 2008-
09, future guidance will prescribe procedures applicable to applications for
certification with respect to the returned credits.
SECTION 9. QUALIFIED PROGRESS EXPENDITURES
.01 Section 48A(b)(3) provides that rules similar to the rules of § 46(c)(4)
and (d) (as in effect on the day before the enactment of the Revenue
Reconciliation Act of 1990) shall apply for purposes of § 48A. Former §§ 46(c)(4)
and 46(d) provided the rules for claiming the investment credit on qualified
progress expenditures (as defined in former § 46(d)(3)) made by a taxpayer
during the taxable year for the construction of progress expenditure property (as
defined in former § 46(d)(2)).
.02 In the case of self-constructed property (as defined in former
§ 46(d)(5)(A)), former § 46(d)(3)(A) defined qualified progress expenditures to
mean the amount that is properly chargeable (during the taxable year) to capital

26
account with respect to that property. With respect to a qualifying advanced coal
project that is self-constructed property, amounts paid or incurred are chargeable
to capital account at the time and to the extent they are properly includible in
computing basis under the taxpayer’s method of accounting (for example, after
applying the requirements of § 461, including the economic performance
requirement of § 461(h)).
.03 To claim the qualifying advanced coal project credit on the qualified
progress expenditures paid or incurred by a taxpayer during the taxable year for
construction of a qualifying advanced coal project, the taxpayer must make an
election under the rules set forth in § 1.46-5(o) of the Income Tax Regulations. A
taxpayer may not make the qualified progress expenditures election for a
qualifying advanced coal project until the taxpayer has received an acceptance
letter for the project under section 4.02(10) of this notice.
.04 If a taxpayer makes the qualified progress expenditures election
pursuant to section 9.03 of this notice, rules similar to the recapture rules in
§ 50(a)(2)(A)-(D) apply. In addition to the cessation events listed in § 50(a)(2)(A),
examples of other events that will cause the project to cease being a qualifying
advanced coal project are:
(1) Failure to satisfy any of the certification requirements in § 48A(e)(2)
within 2 years from the date that the Service accepted the taxpayer’s application
for § 48A certification for the project under section 4.02(10) of this notice;
(2) Failure to receive a certification for the project in accordance with
section 6.03 of this notice;

27
(3) Failure to place the project in service within 5 years from the date of
issuance of the certification under section 6.03 of this notice; or
(4) A significant change to the plans for the project as set forth in the
applications for § 48A and DOE certification if, under section 7.03 of this notice,
the Service’s acceptance of the project is void as a result of the change.
SECTION 10. DISCLOSURE OF INFORMATION
.01 In general
. Any information contained in the application for DOE
certification, the application for § 48A certification, or the documentation
submitted by the taxpayer pursuant to section 6.02 of this notice is subject to
§ 6103 and to any other applicable exemption set forth in the Freedom of
Information Act (the FOIA). Examples of FOIA exemptions include the FOIA
trade secrets and commercial or financial information exemption of 5 U.S.C.
552(b)(4) and the FOIA personal privacy exemption of 5 U.S.C. 552(b)(6)).
.02 FOIA requests
. Anyone interested in submitting a request for records
under the FOIA with respect to the qualifying advanced coal project program
under § 48A (including a request for records relating to the application for DOE
certification) should direct a request that conforms to the Service’s FOIA
regulations, found at 26 C.F.R. § 601.702, to the following address:
IRS FOIA Request
Baltimore Disclosure Office
Room 940
31 Hopkins Plaza
Baltimore, MD 21201
SECTION 11. EFFECT ON OTHER DOCUMENTS
Notice 2006-24 is clarified, modified, amplified, and superseded.

28
SECTION 12. EFFECTIVE DATE
This notice is effective June 7, 2007.
SECTION 13. PAPERWORK REDUCTION ACT
The collection of information contained in this notice has been reviewed
and approved by the Office of Management and Budget in accordance with the
Paperwork Reduction Act (44 U.S.C. § 3507) under control number 1545-2003.
An agency may not conduct or sponsor, and a person is not required to
respond to, a collection of information unless the collection of information
displays a valid OMB control number.
The collections of information in this notice are in sections 4, 5, 6, 7, 8,
and Appendix B of this notice. This information is required to obtain an allocation
of qualifying advanced coal project credits. This information will be used by the
Service to verify that the taxpayer is eligible for the qualifying advanced coal
project credits. The collection of information is required to obtain a benefit. The
likely respondents are business or other for-profit institutions.
The estimated total annual reporting burden is 4,950 hours.
The estimated annual burden per respondent varies from 70 to 150 hours,
depending on individual circumstances, with an estimated average of 110 hours.
The estimated number of respondents is 45.
The estimated annual frequency of responses is on occasion.
Books or records relating to a collection of information must be retained as
long as their contents may become material in the administration of any internal
revenue law. Generally, tax returns and tax return information are confidential,

29
as required by 26 U.S.C. § 6103.
SECTION 14. DRAFTING INFORMATION

The principal author of this notice is Ruba Nasrallah of the Office of
Associate Chief Counsel (Income Tax & Accounting). For further information
regarding this notice, contact Jaime Park of the Office of Associate Chief
Counsel (Passthroughs & Special Industries) at (202) 622-3120 (not a toll-free
call). For further information regarding the application for § 48A certification, the
documentation to be submitted to the Service establishing that the requirements
of § 48A(e)(2) are satisfied, and the issuance of the certification that the
requirements of § 48A(e)(2) are satisfied, contact Kimberly Edwards, Executive
Assistant, Office of the Industry Director, Natural Resources and Construction, at
(713) 209-3615 (not a toll-free number).

30
APPENDIX A
CLOSING AGREEMENT

Under § 7121 of the Internal Revenue Code, [insert taxpayer’s name,
address, and identifying number] (“Taxpayer”) and the Commissioner of Internal
Revenue (“Commissioner”) make the following closing agreement:
WHEREAS:
1. On or before March [insert date and year], Taxpayer submitted to the
Internal Revenue Service (“IRS”), an application for certification under the
qualifying advanced coal project program described in Notice 2007-52
(“Application for § 48A Certification”);
2. Taxpayer’s Application for § 48A Certification is for the qualifying
advanced coal project (the “Project”) described below--
(1) The Project will use [insert either “an integrated gasification
combined cycle (as defined in § 48A(c)(7))” or “an advanced coal-based
technology (as defined in § 48A(c)(2) and (f)) other than an integrated
gasification combined cycle”];
(2) The Project will be located at [insert address or other identifying
designation];
(3) The Project is [insert either: “a new electric generation unit (as
defined in § 48A(c)(6))”; “a retrofit of an existing electric generation unit (as
defined in § 48A(c)(6))”; or “a repower of an existing electric generation unit (as
defined in § 48a(c)(6)”);

31
(4) The Project will have a total nameplate generating capacity (as
defined in section 3.02 of Notice 2007-52) of at least [insert number] megawatts;
[If the Project is an integrated gasification combined cycle project, insert:
(5) At all times more than 50 percent of the cumulative total fuel
input (as defined in section 3.03(1) of Notice 2007-52 and including coal and any
other fuel input) used during normal plant operations (as defined in section
3.03(2) of Notice 2007-52) for the Project will be [insert either: “bituminous coal”;
“subbituminous coal”; or “lignite”];] and
3. On [insert date of acceptance letter issued under section 4.02(10) of
Notice 2007-52], the IRS accepted Taxpayer’s Application for § 48A Certification
for the Project and allocated a qualifying advanced coal project credit under §
48A in the amount of $[insert number] to the Project.
NOW IT IS HEREBY DETERMINED AND AGREED FOR FEDERAL INCOME
TAX PURPOSES THAT:
1. The total amount of the qualifying advanced coal project credit to be
claimed for the Project under § 48A(a) must not exceed $[insert the number in
WHEREAS clause #3].
2. If Taxpayer fails to satisfy any of the certification requirements in
§ 48A(e)(2) within the time specified in § 48A(d)(2)(D) (2 years from [insert the
date in WHEREAS clause #3]), or if the IRS does not issue a certification for the
Project under Notice 2007-52, the qualifying advanced coal project credit in the
amount of $[insert the number in WHEREAS clause #3] allocated to the Project
is fully forfeited.

32
3. If the Project is not placed in service by Taxpayer within 5 years of the
date of issuance of the certification as determined under section 6.03 of Notice
2007-52, the qualifying advanced coal project credit in the amount of $[insert the
number in WHEREAS clause #3] allocated to the Project is fully forfeited.
4. If the plans for the Project change in any significant respect from the
plans set forth in the application for DOE certification (as defined in section 4.01
of Notice 2007-52) and the Application for § 48A Certification (as defined in
section 4.01 of Notice 2007-52) and, under section 7.03 of Notice 2007-52, the
acceptance of Taxpayer’s Application for § 48A Certification on [insert the date in
WHEREAS clause #3] is void, the qualifying advanced coal project credit in the
amount of $[insert the number in WHEREAS clause #3] allocated to the Project
is fully forfeited.
[If the Project is not an integrated gasification combined cycle project,
insert:
5. If the Project fails to satisfy any of the requirements in § 48A(e)(1)(A),
(C), (D), (E), and (F) for a qualifying advanced coal project or, during normal
plant operations (as defined in section 3.03(2) of Notice 2007-52), fails to satisfy
the requirement in § 48A(e)(1)(B) for a qualifying advanced coal project--
(1) at the time the Project is placed in service, the qualifying advanced
coal project credit in the amount of $[insert the number in WHEREAS clause #3]
allocated to the Project is fully forfeited; and
(2) after the Project is placed in service (and after satisfying all such
requirements at the time the Project is placed in service), the Project ceases to

33
be investment credit property and the recapture rules of § 50(a) apply.]
[If the Project is an integrated gasification combined cycle project, insert:
5. (1) If the Project fails to satisfy any of the requirements in §
48A(e)(1)(A), (C), (D), (E), and (F) for a qualifying advanced coal project or,
during normal plant operations (as defined in section 3.03(2) of Notice 2007-52),
fails to satisfy the requirement in § 48A(e)(1)(B) for a qualifying advanced coal
project--
(a) at the time the Project is placed in service, the qualifying
advanced coal project credit in the amount of $[insert the number in WHEREAS
clause #3] allocated to the Project is fully forfeited; and
(b) after the Project is placed in service (and after satisfying all such
requirements at the time the Project is placed in service), the Project ceases to
be investment credit property and the recapture rules of § 50(a) apply.
(2) If at any time more than 50 percent of the cumulative total fuel input
(as defined in section 3.03(1) of Notice 2007-52 and including coal and any other
fuel input) used during normal plant operations (as defined in section 3.03(2) of
Notice 2007-52) is not [insert the primary feedstock in WHEREAS clause #2(5)],
the Project ceases to be investment credit property and the recapture rules of
§ 50(a) apply.]
6. Taxpayer will not claim the qualifying gasification project credit under
§ 48B for any qualified investment for which the qualifying advanced coal project
credit is allowed under § 48A.
7. If Taxpayer elects to claim the qualifying advanced coal project credit

34
on the qualified progress expenditures paid or incurred by Taxpayer during the
taxable year(s) during which the Project is under construction and the Project
ceases to be a qualifying advanced coal project (whether before, at the time, or
after the Project is placed in service), rules similar to the recapture rules in §
50(a)(2)(A) through (D) apply.
8. This agreement applies only to Taxpayer. Any successor in interest
must execute a new closing agreement with the IRS. If the interest is acquired at
or before the time the Project is placed in service and the successor in interest
fails to execute a new closing agreement, the qualifying advanced coal project
credit in the amount of $[insert the number in WHEREAS clause #3] allocated to
the Project is fully forfeited. If the interest is acquired after the time the Project is
placed in service and the successor in interest fails to execute a new closing
agreement, the Project ceases to be investment credit property and the recapture
rules of § 50(a) apply.
THIS AGREEMENT IS FINAL AND CONCLUSIVE EXCEPT:
1. The matter it relates to may be reopened in the event of fraud,
malfeasance, or misrepresentation of a material fact;
2. It is subject to the Internal Revenue Code sections that expressly
provide that effect be given to their provisions (including any stated exception for
§ 7122) notwithstanding any law or rule of law; and
3. If it relates to a tax period ending after the date of this Closing
Agreement, it is subject to any law enacted after such date, which applies to the
tax period.

35

By signing, the parties certify that they have read and agreed to the terms of this
Closing Agreement.

Taxpayer: [insert name and identifying number]

By: __________________________________ Date Signed: ____________
[insert name]

Title: [insert title]
[insert taxpayer’s name]

Commissioner of Internal Revenue

By: _________________________________ Date Signed: ____________
[insert name]

Title: [insert title]

36

I have examined the specific matters involved and recommend the
acceptance of the proposed agreement.
(Receiving Officer) ......................................................................
(Title) .................................................
Date Signed ....................................................

I have reviewed the specific matters involved and recommend the
acceptance of the proposed agreement.

(Reviewing Officer) ....................................................................
(Title) ...............................................
Date Signed ....................................................

37
APPENDIX B

APPLICATION FOR DOE CERTIFICATION

REQUEST FOR SUPPLEMENTAL APPLICATION INFORMATION FOR DOE

The Internal Revenue Service (“IRS”) and the Department of Energy (“DOE”)
seek to certify applications that demonstrate a high likelihood of being
successfully implemented by the applicants. To qualify, projects must be
economically feasible and use the appropriate clean coal technology.

This request for submission of supplemental application information:

1. Describes the information to be provided by the applicant seeking a
certification of feasibility, and
2. Lists the evaluation criteria and Program Policy Factors to be used by
DOE in the evaluation of applications.

In conducting this evaluation, the DOE may utilize assistance and advice from
qualified personnel from other Federal agencies and/or non-conflicted
contractors. DOE will obtain assurances in advance from all evaluators that
application information shall be kept confidential and used only for evaluation
purposes. DOE reserves the right to request clarifications and/or supplemental
information from some or all applicants through written submissions and/or oral
presentations.

Notice is given that DOE may determine whether or not to provide a certification
to the IRS at any time after the application has been received, without further
exchanges or discussions. Therefore, all applicants are advised to submit their
most complete and responsive application.

Applications will not be returned.

SUBMISSION INFORMATION FOR DOE CERTIFICATION APPLICATION

A. General

This request, together with the information in sections 5.02, 7.01, and 7.02 of
Notice 2007-52 includes all the information needed to complete an application for
DOE certification. All applications shall be prepared in accordance with this
request in order to provide a standard basis for evaluation and to ensure that
each application will be uniform as to format and sequence.

Each application should clearly demonstrate the applicant’s capability,
knowledge, and experience in regard to the requirements described herein.

38

Applicants should fully address the requirements of Notice 2007-52 and this
request and not rely on the presumed background knowledge of reviewers.
DOE may reject an application that does not follow the instructions regarding the
organization and content of the application when the nature of the deviation
and/or omission precludes meaningful review of the application.

B. Unnecessarily Elaborate Applications

Unnecessarily elaborate brochures or other presentations beyond those sufficient
to present a complete and effective application are not desired. Elaborate art
work, graphics and pictures are neither required nor encouraged.

C. Application Submission for DOE Certification

The application submission to DOE must include the information and
documentation required by sections 5.02, 7.01, and 7.02 of Notice 2007-52.

An application to DOE will not be considered in the allocation round conducted in
2007-08 unless it is postmarked by October 31, 2007, and will not be considered
in the allocation round conducted in 2008-09 unless it is postmarked by October
31, 2008. Two paper copies and one electronic version on a floppy disc or a CD
of the Application must be submitted to:

Melissa Robe
National Energy Technology Laboratory
3610 Collins Ferry Road
Morgantown, WV 26507

Note that under section 5.03(1) of Notice 2007-52, one paper copy and one
electronic version must be sent to the IRS as part of the application for IRS
certification. The application for IRS certification will not be considered in the
allocation round conducted in 2007-08 unless it is submitted to the IRS by March
3, 2008, and will not be considered in the allocation round conducted in 2008-09
unless it is submitted to the IRS by March 2, 2009.

THE INFORMATION REQUIRED BY THIS REQUEST MUST BE SUBMITTED
USING THE FORMAT AND THE HEADINGS OF THE “PROJECT
INFORMATION MEMORANDUM” AS DESCRIBED BELOW.

To aid in evaluation, applications shall be clearly and concisely written and
logically assembled. All pages of each part shall be appropriately numbered and
identified with the name of the applicant and the date.

The application, including the Project Information Memorandum, MUST be
formatted in one of the following software applications:

39

Microsoft Word
tm
2002 or later edition
Microsoft Excel
tm
2002 or later edition
Adobe Acrobat
tm
PDF 6.0 or later edition

Financial models should be submitted using the Excel
tm
spreadsheet and must
include calculation formulas and assumptions.

The applicant is responsible for the integrity and structure of the electronic files.
The DOE will not be responsible for reformatting, restructuring or converting any
files submitted under this announcement.

The Project Information Memorandum, excluding Appendices
, shall not exceed
seventy-five (75) pages. Pages in excess of the page limitation will not be
considered for evaluation. All text shall be typed, single spaced, using 12 point
font, 1 inch margins, and unreduced 8-1/2-inch by 11-inch pages. Illustrations
and charts shall be legible with all text in legible font. Pages shall be sequentially
numbered. Except as otherwise noted herein the page guidelines previously set
forth constitute a limitation on the total amount of material that may be submitted
for evaluation. No material may be incorporated in any application by reference
as a means to circumvent the page limitation.

D. Form of Project Information Memorandum

PROJECT INFORMATION MEMORANDUM

I. SUMMARY AND INTRODUCTION

• Description of the Project
• Financing and Ownership Structure
• Describe the main parties to the project, including background,
ownership and related experience
• Current Project Status and Schedule to Beginning of Construction

II. TECHNOLOGY AND TECHNICAL INFORMATION

Provide a description of the proposed technology, including sufficient
supporting information (such as vendor guarantees, process flow
diagrams, equipment descriptions, information on each major process unit
and the total plant, compositions of major streams, and the technical plan
for achieving the goals proposed for the project) as would be needed to
allow DOE to confirm that the technical requirements of § 48A are met.
Specifically the applicant should:

• Provide evidence sufficient to demonstrate that the proposed
technology meets the definition of “Advanced Coal-Based Generation

40
Technology,” either as integrated gasification combined cycle (IGCC)
technology, or other advanced coal-based electric generation
technology meeting the heat rate requirement of 8530 Btu/kWh. For
advanced coal-based electric generation:
o The applicant must provide evidence sufficient to justify the
actual heat rate and heat rate corrected to conditions
specified in § 48A(f)(2)
o For projects including existing units, the applicant must
provide evidence sufficient to justify that the proposed
technology meets heat rate requirements specified in §
48A(f)(3)
• Provide evidence sufficient to justify that the proposed project is
designed to meet the following performance requirements:
o SO2 (subbituminous coal is 80 percent or more of fuel
input)........99 percent removal or emissions not more than
0.04 lbs/MMBTU
o SO2 (subbituminous coal is not more than 80 percent of fuel
input)............................99 percent removal
o SO2 (for all projects other than subbituminous coal
projects)........................99 percent removal
o NOx emissions...............0.07 lbs / MMBTU
o PM emissions.................0.015 lbs / MMBTU
o Hg percent removal..........90 percent
• Provide evidence sufficient to demonstrate that the project meets the
requirements for qualifying advanced coal projects as specified under
§ 48A(e)(1) including:
o The project will power a new electric generation unit or
retrofit/repower an existing electric generation unit. At least
50% of the useful output of the project is electrical power.
o The fuel for the project is at least 75% coal (as defined in
§ 48A(c)(4) and section 3.01 of Notice 2007-52), on an
energy input basis.
o The project is located at one site and has a total nameplate
electric power generating capacity (as defined in section
3.02 of Notice 2007-52) of at least 400 MW

III. APPLICANT’S CAPABILITY TO ACCOMPLISH THE TECHNICAL
OBJECTIVES

Provide a narrative supporting the Applicant’s capability to accomplish the
technical objectives of the proposed project, including supporting
documentation demonstrating that the applicant has assembled a team
that is formally committed to participate in the proposed project.

• Provide information to support that the applicant has assembled a
team with the skills and resources needed to implement the project as

41
proposed. Provide signed agreements or letters from team members
demonstrating that the proposed team members are fully committed to
the project.
• Provide information, including examples of prior similar projects
completed by applicant, EPC contractor, and suppliers of major
subsystems or equipment, which support the capabilities of the
applicant and its team members to design, construct, permit, and
operate the facility. The applicant should demonstrate that the team
members have a corporate history of successful completion of similar
projects.
• Provide information to support that key personnel of the applicant and
its team members have knowledge, experience, and adequate degree
of involvement to successfully implement the project.
• Include the project status and relevant information from ongoing
engineering activities. Also include in an appendix any engineering
report or reports used by the applicant to develop the project and to
estimate costs and operating performance. Include copies of any
signed agreements to support project status claims regarding
preliminary design studies, FEED, and EPC-type agreements.

IV. PRIORITY FOR INTEGRATED GASIFICATION COMBINED CYCLE
PROJECTS

For IGCC Projects, the applicant must submit information sufficient for
categorization and prioritization of projects for certification, including:

• Identification of the primary feedstock (as defined in section 5.02(5) of
Notice 2007-52), and all other feedstocks.
• If applicable, evidence demonstrating that the project will be capable of
adding components that can capture, separate and permanently
sequester greenhouse gases.
• A plan showing how project by-products will be marketed and utilized.
• Other benefits, if any.

V. SITE CONTROL AND OWNERSHIP

Provide evidence that demonstrates the overall feasibility of implementing
the project at the proposed site.

• Provide evidence that the applicant owns or controls a site in the
United States of sufficient size to allow the proposed project to be
constructed and operated on a long-term basis. Documentation such
as a deed demonstrating the applicant owns the project site, a signed
option to purchase the site from the site owner, or a letter of intent by
the site owner to sell the site to the applicant should be provided.

42
• Describe the current infrastructure at the site available to meet the
needs of the project.
• Provide documentation supporting applicant's conclusion that the
proposed site can fully meet all environmental, coal supply, water
supply, transmission interconnect, and public policy requirements.
Such documentation may include signed agreements, letters of intent,
or term sheets, such as coal supply, water supply, and product
transportation etc., and regulatory approvals supporting the key claims.
• Provide detailed plans, schedules and status updates, particularly, for
sites with pre-existing conditions that could impact the proposed
project. Pre-existing conditions may include, but are not limited to,
sites with mandated environmental remediation efforts; brown-field
sites that will require building demolition; or sites requiring substantial
rerouting of existing roads, railroads, transmission lines or pipelines
prior to the start of the project.
• Applicants must select one “proposed site.” However, projects with
key physical or logistical elements that require close integration with
another system for the project to succeed should provide information
on all integrated systems regardless of where they are located.
Example 1: a power plant designed to operate exclusively on coal from
a to-be-opened mine should provide supporting documentation for the
new mine. Example 2: an oxygen-blown IGCC plant planning to
purchase oxygen from a third party who will construct a plant
exclusively for this project should provide documentation for the
oxygen supplier.

VI. UTILIZATION OF PROJECT OUTPUT

Provide evidence that demonstrates that a majority of the project output is
reasonably expected to be acquired or utilized.

• Provide a projection of the anticipated costs of electricity and other
marketable by-products produced by the plant.
• Provide documentation establishing that a majority of the output of the
plant is reasonably expected to be acquired or utilized. Such
documentation should be signed by authorizing officials of both the
buyer and seller, and may include: Sales Agreements, Letters of Intent,
Memoranda of Understanding, Option Agreements, and Power
Purchase Agreements.
• Describe any energy sales arrangements that exist or that may be
contemplated (e.g., a Power Purchase Agreement or Energy Sales
Agreement) and summarize their key terms and conditions.
• Include as an appendix any independent Energy Price Market Study
that has been done in connection with this project, or if no independent

43
market study has been completed, provide a copy of the applicant-
prepared market study.
• Identify and describe any firm arrangements to sell non-power output,
and provide any evidence of such arrangements. If the project
produces a product in addition to power, include as an appendix any
related market study of price and volume of sales expected for that
product.

VII. PROJECT ECONOMICS

Describe the project economics and provide satisfactory evidence of
economic feasibility as demonstrated through the financial forecast and
the underlying project assumptions. The project economic and financial
assumptions should be clearly stated and explained.

Show calculation of the amount of tax credit applied for based on
allowable cost.

VIII. PROJECT DEVELOPMENT AND FINANCIAL PLAN

Provide the total project budget and major plant costs (e.g., development,
operating, capital, construction, and financing costs). Provide the
estimated annual budget for and source of project development costs from
the time of the application until the beginning of construction, including
legal, engineering, financial, environmental, overhead, and other
development costs. Describe the overall approach to project development
and financing sufficient to demonstrate project viability. Provide a
complete explanation of the source and amount of project equity. Provide
a complete explanation of the source and amount of project debt. Provide
the audited financial statements for the most recently ended three fiscal
years and quarterly interim financial statements for the current fiscal year
for (a) the applicant, (b) for any of the project parties providing funding,
and (c) for any third party funding source. If the applicant or another party
does not have audited financial statements, the applicant or the party
should provide equivalent financial statements prepared by the applicant
or the party, in accordance with Generally Accepted Accounting
Principles, and certified as to accuracy and completeness by the Chief
Financial Officer of the party providing the statements.

For internally financed projects, provide evidence that the applicant has
sufficient assets to fund the project with its own resources. Identify any
internal approvals required to commit such assets. Include in an appendix
copies of any board resolution or other approval authorizing the applicant
to commit funds and proceed with the project.

For projects financed through debt instruments either unsecured or

44
secured by assets other than the project, provide evidence that the
applicant has sufficient creditworthiness to obtain such financing along
with a discussion of the status of such instruments. Identify any internal
approvals required to commit the applicant to pursue such financing.
Include in an appendix copies of any board resolution or other approval
authorizing the applicant to commit to such financing.

For projects financed through investor equity contributions, describe the
source and status of each contribution. Discuss each investor’s financial
capability to meet its commitments. Include in an appendix, copies of any
executed investment agreements.

If financing through a public offering or private placement of either debt or
equity is planned for the project, provide the expected debt rating for the
issue and an explanation of applicant's justification for the rating.
Describe the status of any discussions with prospective investment
bankers or other financial advisors.

Include as an appendix copies of any existing funding commitments or
expressions of interest from funding sources for the project.

For projects employing non-recourse or limited recourse debt financing,
provide a complete discussion of the approach to, and status of, such
financing. In an appendix, provide an Excel based financial model of the
project, with formulas, so that review of the model calculations and
assumptions may be facilitated; provide pro-forma project financial,
economic, capital cost, and operating assumptions, including detail of all
project capital costs, development costs, interest during construction,
transmission interconnection costs, other operating expenses, and all
other costs and expenses.

IX. PROJECT CONTRACT STRUCTURE

Describe the current status of each of the agreements set forth below.
Include as an appendix copies of the contracts or summaries of the key
provisions of each of the following agreements:

• Power Purchase Agreement (if not fully explained in Section IV)
• Coal Supply: describe the source and price of coal supply for the project.
Include as an appendix any studies of coal supply price and amount that
have been prepared. Include a summary of the coal supply contract and a
signed copy of the contract.
• Coal Transportation: explain the arrangements for transporting coal,
including costs.

45
• Operations & Maintenance Agreement: include a summary of the terms
and conditions of the contract and a copy of the contract.
• Shareholders Agreement: summarize key terms and include the
agreement as an appendix.
• Engineering, Procurement and Construction Agreement: describe the key
terms of the existing or expected EPC contract arrangement, including
firm price, liquidated damages, hold-backs, performance guarantees, etc.
• Water Supply Agreement: confirm the amount, source, and cost of water
supply.
• Transmission Interconnection Agreement: explain the requirements to
connect to the system and the current status of negotiations in this
respect.

X. PERMITS INCLUDING ENVIRONMENTAL AUTHORIZATIONS

• Provide a complete list of all federal, state, and local permits, including
environmental authorizations or reviews, necessary to commence
construction of the project.
• Explain what actions have been taken to date to satisfy the required
authorizations and reviews, and the status of each.
• Provide a description of the applicant’s plan to obtain and complete all
necessary permits, and environmental authorizations and reviews.

XI. STEAM TURBINE PURCHASE

• If applicant plans to purchase a steam turbine or turbines for the project,
indicate the prospective vendors for the turbine and explain the current
status of purchase negotiations, and provide a timeline for negotiation and
purchase with expected purchase date.

XII. PROJECT SCHEDULE

• Provide an overall project schedule which includes technical, business,
financial, permitting and other factors to substantiate that the project will
meet the 2 year project certification and 5 year placed-in-service
requirement.

• The project schedule should be comprehensive and provide sufficient
detail to demonstrate how applicant will meet the certification and placed-
in-service requirements. The schedule should demonstrate that the
applicant understands the required tasks, and has allowed realistic times
for accomplishing the technical and financial tasks. The schedule should
include the milestone accomplishments needed to obtain the financing for
the project.

• Applicants should document their progress toward meeting the 2 year

46
completion of permitting deadline. Existing permits and permit
applications must be specific to the project proposed. If existing permits
are not specific for the proposed coal-based project (e.g.. the permits are
for oil-fired or natural gas-based units), specific plans, procedures and
schedules for reapplying, modifying and/or renegotiating permits should
be provided. Any local, state or federal permitting schedules which may
impact the overall project schedule should be included.

• Applicant should document their progress toward obtaining engineering
design information (FEED) to initiate permitting activities and to finalize the
turbine generator purchase specification within the 2 year window. Most
often, this requires final site, technology, process selection. Signed FEED
and/or EPC-type agreements, if available, should be provided.

APPENDICES

• Copy of internal or external engineering reports.
• Copy of site plan, together with evidence that applicant owns or controls a
site. Examples of evidence would include a deed, or an executed contract
to purchase or lease the site.
• Information supporting applicant's conclusion that the site is fully
acceptable as the project site with respect to environment, coal supply,
water supply, transmission interconnect, and public policy reasons.
• Power Purchase or Energy Sales Agreement.
• Energy Market Study.
• Market Study for non-power output.
• Financial Model of project.
• Financial statements for the applicant and other project funding sources
for the most recently ended three fiscal years, and the unaudited quarterly
interim financial statements for the current fiscal year.
• Expressions of interest or commitment letters from funding sources.
• For each project contract, if no contract currently exists, provide a
summary of the expected terms and conditions.
• List of all federal, state, and local permits, including environmental
authorizations or reviews, necessary to commence construction.

E. Evaluation Criteria

Advanced coal projects: will be evaluated on whether they meet all the
requirements of § 48A.

Technical: will be evaluated on whether the applicant has demonstrated the
capability to accomplish the technical objectives.

Site: will be evaluated on the basis that the site requirement for ownership or
control has been met, and that the site is suitable for the proposed project.

47

Economic: will be evaluated on whether the project has demonstrated economic
feasibility, taking into consideration the submitted financial and project
development and structural information and financial plan.

Schedule: will be evaluated on the applicant’s ability to meet the 2 year project
certification and the 5 year placed-in-service requirement.

F. Program Policy Factors to be used by DOE in the evaluation of
applications

Section 48A identifies minimum requirements for consideration for the qualifying
advanced coal project credit, including the project’s technical feasibility, cost, and
applicant’s ability. In the event that there are more qualified (certifiable)
applications than there are available tax credits, the DOE will apply additional
factors to rank eligible IGCC and non-IGCC projects based on their ability to
advance coal technology beyond its current state.

If there are more certified applications than available credits for a pool described
in section 4.02(2) of Notice 2007-52, DOE will rank the certified projects in
descending order (that is, first, second, third, etc.), based on evaluation of the
following Program Policy Factors. Factors 1, 2, and 3 are Primary Ranking
Factors. A certified project that satisfies one of these factors will be ranked
ahead of each project that satisfies only factors listed below that factor.
Specifically, all certified projects satisfying Factor 1 will be selected before any
project that does not satisfy Factor 1; all projects satisfying Factor 2 will be
ranked ahead of any project that satisfies only Factor 3 and/or one or more
Secondary Ranking Factors; and all projects satisfying Factor 3 will be ranked
ahead of any project that does not satisfy any Primary Ranking Factors.

Primary Ranking Factors:

1. Capture and sequestration of 50 percent or more carbon dioxide
emissions. Only projects capturing and sequestering 50 percent or more
of the plant’s carbon dioxide emissions will satisfy this factor. Within this
factor, higher rankings will be given to those projects capturing and
sequestering higher percentages of plant carbon dioxide emissions.

2. Use of advanced technologies that optimize the plant for future carbon
dioxide capture (for example, gasifier sizing and pressure, air separation
unit sizing, and quench system) as well as systems that are designed to
capture and sequester less than 50 percent of the carbon dioxide. Within
this factor, higher rankings will be given to those projects capturing and
sequestering higher percentages of plant carbon dioxide emissions and/or
requiring less retrofitting to implement greater than 50 percent carbon

48
capture and sequestration.

3. Location of the facility within 25 miles of potential carbon sequestration
locations and carbon dioxide (CO2) pipelines or pipeline easements.
Within this factor, higher rankings will be given to those projects with the
facility located closer to potential carbon sequestration locations and
carbon dioxide (CO2) pipelines or pipeline easements.

Secondary Ranking Factors:

• Location of the facility relative to potential carbon sequestration
locations and carbon dioxide (CO2) pipelines or pipeline easements
(for facilities not meeting Factor 3).

• Presentation of other environmental, economic, or performance
benefits (including, in the case of an IGCC project, priority factors that
are listed in section 5.02(10) of Notice 2007-52 and are not included in
the Primary Ranking Factors).

• Higher plant efficiency.

• Geographic distribution of potential markets.

• The ratio of total nameplate generating capacity (as defined in section
3.02 of Notice 2007-52) to requested tax credit.

• Diversity of technology approaches and methods.

G. Supplemental Technical and Financial Guidance for Section D
“Project Information Memorandum”

Technology and Technical Information

• It is important that the applicant select a specific gasification system for
their project. Without that decision, it is difficult to provide the necessary
specific design information needed for DOE to evaluate the project
feasibility with respect to performance, emissions, outputs of major
streams as well as capital and operating costs.

• The Applicant’s capability to meet the legislated heat rate and/or
environmental targets should be supported with design information, and or
vendor guarantees which are project, site and coal specific.

49
Project Economics

• Applicants should demonstrate the project’s economic feasibility and
financial viability by providing a clear statement and explanation of the
economic and financial assumptions made by the applicant, and a
financial forecast for the project. The financial forecast should flow
logically from the applicant’s assumptions and be consistent with them.
Applicants should include assumptions regarding financial and economic
issues that may not be included in the project costs but have a direct
impact on the project. The examples given in the “Site Control and
Ownership” section are relevant here and their impact on the project
economics should be discussed here.

Project Development and Financial Plan

• The information provided by the applicant in this section should
demonstrate that the applicant’s financial plan for developing the project is
feasible and that the applicant will have access to necessary financing.
The applicant should explain the source and timing for obtaining all
financing, including the project development costs. It is important that the
applicant explain and provide evidence that it has the capacity to fund the
pre-construction project development costs, together with a budget for and
description of those costs. Note that financial information is required for
the applicant and for any other funding source.

Project Contract Structure

• This section requires that the applicant demonstrate an understanding of
the commercial contracting process and show progress in establishing the
framework of contracts and agreements that a project typically requires.
Applicants should show that their intended contract structure is reasonable
and that their assumptions relative to price, terms, and conditions are
consistent with current market conditions. Evidence of final agreements,
agreements in principle, or summaries of terms and conditions between
the applicant and contract counterparties should be provided if available.

50
APPENDIX C

CONSENT TO PUBLIC DISCLOSURE
OF CERTAIN QUALIFYING ADVANCED COAL PROJECT PROGRAM
APPLICATION INFORMATION

In the event that the Application for § 48A Certification of [(Insert name of
applicant-taxpayer here): ____________________________] (the Applicant-
Taxpayer) for an allocation of qualifying advanced coal project credits under
section 48A of the Internal Revenue Code is approved, the undersigned
authorized representative of the Applicant-Taxpayer hereby consents to the
disclosure by the Internal Revenue Service through publication of a Notice in the
Internal Revenue Bulletin or a press release of: (1) the name of the Applicant-
Taxpayer; (2) if the Applicant-Taxpayer is a member of an affiliated group filing
consolidated returns, the name of the common parent of the group; (3) the type
and location of the project that is the subject of the Application for § 48A
Certification; and (4) the amount of the allocation, if any, of qualifying advanced
coal project credits for such project. The undersigned understands that this
information might be published, broadcast, discussed, or otherwise disseminated
in the public record.

This authorization shall become effective upon the execution thereof. Except to
the extent disclosure is authorized herein, the returns and return information of
the undersigned taxpayer are confidential and are protected by law under the
Internal Revenue Code.

I certify that I have the authority to execute this consent to disclose on behalf of
the taxpayer named below.

Date: __________________ Signature:
_________________________

Print name:
_________________________

Title:
_________________________

Name of Applicant-Taxpayer: ___________________________________

Taxpayer Identification Number: _________________________________

Taxpayer’s Address:
____________________________________________

51

____________________________________________

____________________________________________

Note: Treasury Regulations require that the Internal Revenue Service must
receive this consent within 60 days after it is signed and dated.

Setzen Sie Ihre Recherche in ChatGPT oder Claude fort

Verbinden Sie Omnilex, um den Rechtskorpus über Ihren KI-Assistenten zu durchsuchen.