Pennsylvania Act 1984-62 — CAPITAL BUDGET ACT OF 1983 - 1984, SUPPLEMENT

act-1984-0-621984 Pa. Act 62Law

Act text
CAPITAL BUDGET ACT OF 1983 - 1984, SUPPLEMENT
Act of May. 18, 1984, P.L. 263, No. 62Cl. 86

A SUPPLEMENT

To the act of July 11, 1983 (P.L.422, No.2A), entitled "An act providing for the capital budget for the fiscal year 1983-1984," itemizing public improvement projects, furniture and equipment projects, redevelopment assistance projects and transportation assistance projects to be constructed or acquired or assisted by the Department of General Services, the Department of Transportation, the Department of Community Affairs or the Pennsylvania Fish Commission, together with their estimated financial cost; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed or acquired or assisted by the Department of General Services, the Department of Transportation or the Department of Community Affairs; stating the estimated useful life of the projects; authorizing issuing officials to undertake limited temporary borrowing through negotiated settlements; and making an appropriation.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1. Total authorizations.

(a) The total authorization for the additional capital projects in the category of public improvement projects itemized in section 2 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, shall be $633,121,000.

(b) The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 3 and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, shall be $15,587,000.

(c) The total authorization for the capital project in the category of redevelopment assistance projects itemized in section 4 for capital grants by the Department of Community Affairs, its successors or assigns, and to be financed by the incurring of debt, shall be $44,165,000.

(d) The total authorization for the additional capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, shall be $11,408,000.

(e) The total authorization for the additional capital projects in the category of public improvement projects itemized in section 6 and to be acquired or constructed by the Pennsylvania Fish Commission, its successors or assigns and to be financed from the current revenues of the Fish Fund pursuant to executive authorization, shall be $2,498,000.

Compiler's Note: The Department of Community Affairs, referred to in subsec. (c), was abolished by Act 58 of 1996 and its functions were transferred to the Department of Community and Economic Development.

Compiler's Note: The name of the Pennsylvania Fish Commission, referred to in subsec. (e), was changed to the Pennsylvania Fish and Boat Commission by Act 39 of 1991. See 30 Pa.C.S. § 308 (relating to designation of commission).

Section 2. Itemization of public improvement projects.

Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

Project Base Design & Total

Project Contin- Project

Allocation gencies Allocation

(1) Department of

Agriculture $3,521,000 $703,000 $4,224,000

(i) Agriculture

Building - Harris-

burg

(A) Alterations to

Laboratory Venti-

lation and Drain-

age Systems 202,000 40,000 242,000

(ii) Farm Show Com-

plex - Harrisburg

(A) Livestock

Exhibition Hall 3,227,000 645,000 3,872,000

(iii) Summerdale

Laboratory

(A) Additional

funds for Pro-

ject No. DGS 700-24;

Air-Condition

Laboratory

Building 92,000 18,000 110,000

(2) Bureau of

Correction $58,585,000 $11,549,000 $70,134,000

(i) State Correc-

tional Institu-

tion - Camp Hill

(A) Perimeter

Security Fence 811,000 162,000 973,000

(B) Street and

Perimeter

Lighting 130,000 26,000 156,000

(C) Mental Health

Facility 490,000 98,000 588,000

(ii) State Correc-

tional Institu-

tion - Cresson

(A) Additional

funds for Project

No. DGS 1574-1;

Conversion of

Cresson State Center

to a State

Correctional

Institution 3,864,000 773,000 4,637,000

(iii) State Correc-

tional Institu-

tion - Graterford

(A) Expansion Pro-

gram - Phase II 14,463,000 2,893,000 17,356,000

(B) Additional

funds for Project

No. DGS 577-15;

Expansion of

Institution 1,969,000 393,000 2,362,000

(C) Additional

funds for Project

No. DGS 577-14;

New Boiler Plant 1,261,000 252,000 1,513,000

(D) Additional

funds for Expan-

sion of Project

No. DGS 577-10;

Improvements to

Sewage Treatment

System 6,166,000 1,067,000 7,233,000

(E) Additional

funds for Project

No. DGS 577-17;

Yard lighting 147,000 29,000 176,000

(F) Rehabilitation

of Existing

Buildings 5,000,000 1,000,000 6,000,000

(iv) State Correc-

tional Institution -

Dallas

(A) Additional

funds for Project

No. DGS 578-9;

Water Treatment

System 132,000 26,000 158,000

(B) Additional

Security and

Updating Lighting 1,500,000 300,000 1,800,000

(C) Guard Towers 200,000 40,000 240,000

(D) Mental Health

Facility 650,000 130,000 780,000

(v) State Correc-

tional Institution -

Luzerne

(A) Additional

funds for Project

No. DGS 1575-1;

Conversion of

Retreat State

Hospital to a

State Correction-

al Institution,

Including Expan-

sion of Capacity

from 356 to 500 5,000,000 1,000,000 6,000,000

(vi) State Correction-

al Institution -

Mercer

(A) Additional funds

for Project No.

DGS 1572-3;

Expansion of

Institution 2,571,000 514,000 3,085,000

(vii) State Correc-

tional Institution -

Pittsburgh

(A) Additional

funds for Project

No. DGS 570-21;

New Administration

Building, Central

Stores Building,

Replacement Housing

Units, and Expan-

sion of Utility

Systems 1,838,000 368,000 2,206,000

(B) Construction of

a Health Services

Building, including

up to 50 beds for

short-term treatment

of mentally ill

inmates 4,200,000 840,000 5,040,000

(viii) State Correc-

tional Institution -

Huntingdon County

(A) Additional

funds for Project

No. DGS 1573-1;

New Correctional

Institution 2,766,000 553,000 3,319,000

(ix) State Correc-

tional Institution -

Greensburg

(A) Additional

funds for Project

No. DGS 1570-3;

Expansion of

Institution 1,590,000 318,000 1,908,000

(x) State

Correctional

Institution -

Muncy

(A) Mental

Health Facility 420,000 84,000 504,000

(xi) State Correc-

tional Institution -

Schuylkill County

(A) Additional funds

for Project No. 1576-1;

New Correctional

Institution 3,417,000 683,000 4,100,000

(3) Department of

Education $278,998,560 $49,646,440 $328,645,000

(i) Bloomsburg

University

(A) Rehabilitation

and Renovation of

Science Hall 2,779,000 1,190,000 3,969,000

(ii) California

University

(A) Boiler Plant

Renovation

Phase II 1,575,000 235,000 1,810,000

(B) Renovation

of Old Science

Building 2,300,000 350,000 2,650,000

(C) Roof re-

placement 180,000 45,000 225,000

(D) Removal of

asbestos 154,000 38,000 192,000

(iii) Cheyney

University

(A) Improvement in

Internal Renovation

of Carver Science

Center 2,000,000 400,000 2,400,000

(B) Renovations

to Tubman Hall,

Robinson Hall,

Yarnall Hall,

King Hall and

Truth Hall 3,205,000 641,000 3,846,000

(C) Renovation

of and addition

to Cope Hall

Gymnasium 1,038,000 208,000 1,246,000

(D) Renovations

of walkways,

roadways,

parking lots

and install-

ation of

campus security

lighting 350,000 70,000 420,000

(E) Renovation

of Industrial

Arts Building 400,000 80,000 480,000

(F) Renovation

to Presi-

dential Home 100,000 100,000

(iv) Clarion Univer-

sity

(A) Rehabilitation

of Campus Fire

Protection System 933,000 187,000 1,120,000

(B) Construction

to comply with

handicapped care

standards,

Phase II 390,000 78,000 468,000

(C) Renovation

of lecture

hall in Chapel

Theatre 450,000 90,000 540,000

(D) Renovation

of stadium 250,000 50,000 300,000

(E) Venango

Campus:

Remodeling and

refurbishing of

Montgomery Hall 640,000 160,000 800,000

(v) East Strouds-

burg University

(A) Rehabilitation

of Campus Fire

Protection System 760,000 152,000 912,000

(B) Renovations

to Old Dining

Hall to Facilitate

Hotel and Resort

Management

Program 1,440,000 288,000 1,728,000

(vi) Edinboro Univer-

sity

(A) Rehabilitation

of Campus Fire

Protection System 760,000 152,000 912,000

(B) Maintenance

Repair Projects 3,749,000 768,000 4,517,000

(C) Roof re-

placement 644,000 161,000 805,000

(D) Replacement

of windows,

framing and

caulking 80,000 20,000 100,000

(vii) Indiana

University of

Pennsylvania

(A) Cogeneration

Facility 8,350,000 1,650,000 10,000,000

(viii) Kutztown Univer-

sity

(A) Renovation

of Old College 650,000 100,000 750,000

(B) Rehabilitation

of Campus Fire

Protection System 2,800,000 560,000 3,360,000

(C) Construction

of New Residence

Hall 3,892,000 779,000 4,671,000

(D) Renovation

and recondi-

tioning of

athletic

facility 3,000,000 600,000 3,600,000

(E) Repair to

top structure

for Old Main,

Section F 401,000 100,000 501,000

(ix) Lock Haven

University

(A) Demolition,

Grading and

Paving of the

Old Hospital Site 150,000 150,000

(B) Replacement

of Steam Lines 1,000,000 200,000 1,200,000

(C) Renovation

of Akeley 1,229,000 245,000 1,474,000

(D) Renovation of

Price Auditorium 1,584,000 317,000 1,901,000

(x) Mansfield Univer-

sity

(A) Renovation

and repair of

North Hall and

Psychology

Annex 5,750,000 250,000 6,000,000

(B) Phase II:

Renovation of

Steam Distribu-

tion System 750,000 150,000 900,000

(C) Roof

replacement 84,000 16,000 100,000

(D) Installation

of emergency

generator for

Renton Center

and Belknap 100,000 25,000 125,000

(E) Replacement

of piping for

showers for

Cedar Crest

Dormitory 83,000 17,000 100,000

(xi) Millersville

University

(A) Replacement of

Classroom and Office

Facilities in

Myers Hall 5,500,000 1,100,000 6,600,000

(B) Renovation of

the Present Boiler

House to Accommo-

date University

Central Services

Operations 1,500,000 300,000 1,800,000

(C) Renovation

of Byerly Hall 1,360,000 340,000 1,700,000

(xii) Shippensburg

University

(A) Rehabilitation

of Campus Fire

Protection System 1,814,000 363,000 2,177,000

(B) Roof

replacement 120,000 30,000 150,000

(C) Traffic and

pedestrian

safety improve-

ment for Adams

Drive 454,000 114,000 568,000

(xiii) Slippery Rock

University

(A) Rehabilitation

of Campus Fire

Protection System 2,108,000 422,000 2,530,000

(B) Replacement

of utility

structures

and renovation

of interior

structures 1,708,000 427,000 2,135,000

(xiv) West Chester

University

(A) Replacement

Stoker for Central

Boiler Plant 141,000 15,000 156,000

(B) Renovation of

Two Residence

Halls: Wayne Hall

and Goshen Hall 360,000 40,000 400,000

(C) Renovation of

Anderson Hall 2,900,000 500,000 3,400,000

(D) Replacement

of elevator

equipment in

Ramsey Hall 86,000 14,000 100,000

(E) Renovation

of top structure

of Main Hall 154,000 39,000 193,000

(xv) Pennsylvania

State University

(A) Renovation of

Laboratory Space

in Chandlee and

Mueller Buildings

at University

Park Campus 5,000,000 1,000,000 6,000,000

(B) Renovation to

Mechanical

Engineering

Building and

Electrical

Engineering - West

Building at

University Park

Campus 9,480,000 1,896,000 11,376,000

(C) Replacement

and Upgrading

of Scientific

and Engineering

Educational

Equipment in

Commonwealth

Projects at

University

Park Campus

and Commonwealth

Campuses - Phase

I 18,334,000 3,666,000 22,000,000

(D) Initial

Capital Outlay

for Computing,

Informational and

Telecommunications

Networks 8,334,000 1,666,000 10,000,000

(E) Main Campus

Acquisition and

installation of

an oil-fired

boiler and the

conversion of

that boiler to

operate on a

mixture of coal

and water 618,000 186,000 804,000

(F) Improvements

to buildings,

support systems

and grounds

at University

Park including

utilities distri-

bution overhaul,

improve steam

lines, manholes,

condensate lines,

air lines and

pumps 983,000 197,000 1,180,000

(G) Improvements

to waste water

treatment plant,

Phase III 2,675,000 535,000 3,210,000

(H) Additions

to Animal

Industries

Building and

renovation of

Borland

Laboratory 4,750,000 950,000 5,700,000

(I) Reconstruction

of electrical

distribution

system 2,950,000 590,000 3,540,000

(J) Improvements

of water supply

system 2,675,000 535,000 3,210,000

(K) Milton S.

Hershey Medical

Center, hospital

addition including

a center for reha-

bilitation,

physical and

neurological

disabilities and

facilities for an

inpatient geriatric

psychiatry unit as

a component in

the integrated

delivery system

for psychiatric

services 29,600,000 29,600,000

(L) Milton S.

Hershey Medical

Center, hospital

addition for an

inpatient

child psychiatry

unit as a com-

ponent in the inte-

grated delivery

system for

psychiatric

services 2,660,000 2,660,000

(M) Altoona

Campus, con-

struction of a

Community Arts

Center 1,000,000 1,000,000

(N) Behrend

College,

Academic and

Library

Buildings 7,360,000 1,840,000 9,200,000

(O) Behrend

College,

alterations

and additions

to the water

system 160,000 32,000 192,000

(P) Capitol

Campus, repair

and replacement

of heating

system 325,000 65,000 390,000

(Q) Fayette

Campus, repair

or replace

Library HVAC

System 160,000 32,000 192,000

(R) Hazleton

Campus, repair

structural

problems in

Physical

Education

Buildings 160,000 32,000 192,000

(S) McKeesport

Campus, replace

gym floor 110,000 22,000 132,000

(T) Ogontz

Campus, replace

gym floor 187,000 37,000 224,000

(U) Shenango

Valley Cam-

pus, construc-

tion of multi-

purpose in-

structional

building 5,000,000 1,000,000 6,000,000

(V) Worthing-

ton-Scranton

Campus,

replace

gym floor 120,000 24,000 144,000

(xvi) University of

Pittsburgh

(A) Multipurpose

Academic and

Residence

Complex 23,919,000 4,784,000 28,703,000

(B) Renewal

and replacement

of fixed

scientific

equipment in

Commonwealth

buildings 7,540,000 1,660,000 9,200,000

(C) Upgrading

and replacement

of equipment

for School of

Engineering 6,600,000 1,320,000 7,920,000

(D) Greens-

burg Campus

(I) Construction

of library

building 3,861,000 1,089,000 4,950,000

(II) Construction

of Common

Facilities

Building,

Project No.

DGS 1103-21 4,141,000 828,000 4,969,000

(E) Titusville

Campus

(I) Land Acquisi-

tion for Science

Building 500,000 50,000 550,000

(II) Construction

of Science

Building 4,300,000 860,000 5,160,000

(F) Bradford

Campus

(I) Renovation

of Swartz

Hall, Project

No. DGS 1103-A,

Fisher Hall,

Project No.

DGS 1103-20

and Common

Facilities

Building,

Project No.

DGS 1103-30 900,000 900,000

(xvii) Temple

University

(A) Replacement

and Upgrading

of Educational

Equipment in

Commonwealth

Projects 9,795,000 1,959,000 11,754,000

(B) Replacement

and Upgrading

of Equipment in

Engineering

Facilities 4,556,000 910,000 5,466,000

(C) Computing,

Informational

and Telecom-

munications

Network 11,000,000 2,200,000 13,200,000

(D) Hudson

Building

Renovations 3,500,000 700,000 4,200,000

(E) Baptist Temple

Renovation -

Project No. DGS

1104-42 - Addi-

tional funds 2,542,560 508,440 3,051,000

(F) Multipurpose

student facility -

Ambler Campus 6,300,000 1,260,000 7,560,000

(G) Armory Renova-

tion - Project

No. DGS

1104-41 - Addi-

tional funds 2,755,000 551,000 3,306,000

(xviii) Lincoln

University

(A) Computer

Center and

Social Sciences

Building 5,419,000 1,081,000 6,500,000

(xix) Thaddeus Stevens

State School of

Technology

(A) Expansion of

Shop #3 and

related parking

areas 1,840,000 460,000 2,300,000

(B) Remodel

Shop #1 1,440,000 360,000 1,800,000

(C) Install

Condensate

Return Pumps,

Temperature

Controls and

replace old

steam and

utility lines 240,000 60,000 300,000

(xx) Harrisburg

Area Community

College

(A) Construction

of a Public

Safety "Hands on"

Training Center

for fire, police,

emergency medical

services, rescue

services, industrial

fire and safety

programs and

community school

and business

service programs 985,000 197,000 1,182,000

(xxi) Lehigh County

Community College

(A) Construction

of a regional

emergency

training center 1,039,000 208,000 1,247,000

(xxii) Allegheny

County

Community College

(A) Construction of

training center

for emergency

services 800,000 200,000 1,000,000

(xxiii) Beaver County

Community College

(A) Rehabilita-

tion and renova-

tion of student

parking lot 80,000 20,000 100,000

(xxiv) Dropsie

College

(A) Building

Repairs 100,000 100,000

(4) Emergency Manage-

ment Agency $1,315,000 $240,000 $1,555,000

(i) State Fire Acad-

emy

(A) Fire Training

Liquid Fuels

System 125,000 25,000 150,000

(ii) Regional

emergency services

training center

in Bucks County

(A) Construction

of additional

structures and

renovations on

existing

structures 1,190,000 215,000 1,405,000

(5) Department of

Environmental Re-

sources $59,275,000 $11,218,000 $70,493,000

(i) Forest District

No.1

(A) Rehabilitate

State Forest

Roads 180,000 18,000 198,000

(ii) Forest Dis-

trict No.2

(A) Rehabilitate

State Forest

Roads 101,000 10,000 111,000

(iii) Forest Dis-

trict No.3

(A) Rehabilitate

State Forest

Roads 145,000 15,000 160,000

(iv) Forest Dis-

trict No.4

(A) Rehabilitate

State Forest

Roads 99,000 10,000 109,000

(v) Forest Dis-

trict No.5

(A) District

Forestry Office

(I) Construction 210,000 42,000 252,000

(II) Land Acqui-

sition 6,000 1,000 7,000

(B) Rehabilitate

State Forest

Roads 349,000 35,000 384,000

(vi) Forest Dis-

trict No.7

(A) Rehabilitate

State Forest

Roads, including

Tower Rd.

and Church

Mountain Rd. 372,000 37,000 409,000

(vii) Forest Dis-

trict No.9

(A) Rehabilitate

State Forest

Roads 211,000 21,000 232,000

(viii) Forest Dis-

trict No.10

(A) Rehabilitate

State Forest

Roads 357,000 36,000 393,000

(ix) Forest Dis-

trict No.12

(A) Rehabilitate

State Forest

Roads 305,000 31,000 336,000

(x) Forest Dis-

trict No.13

(A) Rehabilitate

State Forest

Roads 162,000 16,000 178,000

(xi) Forest Dis-

trict No.15

(A) Rehabilitate

State Forest

Roads 188,000 19,000 207,000

(xii) Forest Dis-

trict No.16

(A) Rehabilitate

State Forest

Roads 184,000 18,000 202,000

(xiii) Forest Dis-

trict No.19

(A) Rehabilitate

State Forest

Roads 95,000 10,000 105,000

(xiv) Forest Dis-

trict No.20

(A) Rehabilitate

State Forest

Roads 118,000 12,000 130,000

(xv) Danville Bor-

ough - Montour

County

(A) Flood Pro-

tection 1,512,000 302,000 1,814,000

(xvi) Catawissa

Borough - Columbia

County

(A) Flood Pro-

tection 189,000 38,000 227,000

(xvii) Huntingdon

Borough - Huntingdon

County

(A) Additional

funds for Project

DGS 181-2; Flood

Protection 900,000 180,000 1,080,000

(xviii) Blakely

Borough - Lacka-

wanna County

(A) Additional

funds for Flood

Protection 6,000,000 1,200,000 7,200,000

(xix) Bethel Park

Borough -

Allegheny County

(A) Flood

Protection 1,100,000 300,000 1,400,000

(xx) City of

Greensburg and

Hempfield Town-

ship - Westmore-

land County

(A) Flood pro-

tection; tri-

butary Jack's

Run; road

section 1:

Oxford Drive

to Crestview

Drive 298,000 298,000

(B) Flood pro-

tection; tribu-

tary Jack's

Run; Mt.

Pleasant Street

and Highland

Avenue 1,100,000 200,000 1,300,000

(C) Flood pro-

tection; trib-

utary Jack's

Run; North-

mont Street

area 250,000 50,000 300,000

(xxi) Hop Bottom

Borough - Susque-

hanna County

(A) Flood

protection 1,000,000 200,000 1,200,000

(xxii) Millvale

Borough -

Allegheny County

(A) Stream

wall replacement

on Girty's Run 312,000 62,000 374,000

(xxiii) Shaler

Township -

Allegheny

County

(A) Pine Creek

flood control

project on

Glenshaw and

Shaler Flats 1,250,000 250,000 1,500,000

(xxiv) City of

Scranton and

Dunmore Borough -

Lackawanna County

(A) Flood control

projects and re-

pairs including

Keyser Creek,

Lackawanna River,

Leach Creek,

Leggett's Creek,

Lendly Creek,

Lucky Run Creek,

Meadowbrook

Creek, Mountain

Lake, Mountain

Lake Creek,

Roaring Brook

Creek and

Stafford-Meadow-

brook Creek 5,000,000 1,000,000 6,000,000

(xxv) Dupont,

Avoca and

Duryea Boroughs -

Luzerne County

(A) Flood

control project

on Mill Creek 7,000,000 1,400,000 8,400,000

(xxvi) Moosic

Borough -

Lackawanna

County

(A) Flood

control

project on

Springbrook

Creek, land

acquisition

for levy

construction

at Belian

Village 500,000 500,000

(xxvii) City of

Wilkes-Barre -

Luzerne County

(A) Flood control

project on Laurel

Run Creek 320,000 80,000 400,000

(B) Flood control

project on Mill

Creek 320,000 80,000 400,000

(C) Flood control

project on

Solomon Creek 320,000 80,000 400,000

(D) Flood control

project on

Coalbrook Creek 320,000 80,000 400,000

(E) Flood control

project on

Bowman's Creek 320,000 80,000 400,000

(xxviii) Borough of

Turtle Creek -

Allegheny County

(A) Channel Rectifi-

cation on Saw Mill Run

(Relocation of

Utilities so

Project can

Proceed as

Previously

Authorized) 180,000 45,000 225,000

(xxix) Springfield

Township -

Delaware County

(A) Improvement

of hydraulic

characteristics

and erosion

stabilization on

Stoney Creek from

Providence Road

to Joseph Place 219,000 56,000 275,000

(xxx) Bald

Eagle State Park

(A) Campground

development 1,044,000 208,000 1,252,000

(xxxi) Cook Forest

State Park

(A) Sawmill Center

for the Arts,

expansion and

restoration,

including instal-

lation of theatre

stage lighting 80,000 20,000 100,000

(xxxii) Curwensville

State Park

(A) Establish-

ment of camping

grounds 95,000 15,000 110,000

(xxxiii) Denton

Hill State Park

(A) Renovation

and restora-

tion of ski

area 509,000 102,000 611,000

(xxxiv) Nescopeck

State Park

(A) Construc-

tion of a flood

control project

and dam on Nes-

copeck Creek

in Nescopeck

State Park,

Butler and

Dennison Town-

ships,

Luzerne County 4,500,000 900,000 5,400,000

(xxxv) Point

State Park

(A) Construction

of performing

arts stage 900,000 90,000 990,000

(xxxvi) Presque Isle

State Park

(A) Beach Erosion

Control 970,000 97,000 1,067,000

(B) Marina

Expansion,

Phase I 962,000 192,000 1,154,000

(C) Construction

of bicycle

facilities 583,000 117,000 700,000

(xxxvii) Prince

Gallitzin State

Park

(A) Updating pro-

posed plans and

construction

cost for the

Conservation

Education Area

known as Nature

Ealm 110,000 110,000

(B) For re-

habilitation

of the

marine

deck fa-

cilities

within

park 1,000,000 600,000 1,600,000

(xxxviii) Pymatun-

ing State Park

(A) Linesville

Livery, boating

facility

rehabilitation 574,000 111,000 685,000

(B) Espyville

Livery, boat-

ing facility

rehabilitation 400,000 80,000 480,000

(C) Jamestown

Livery, boat-

ing facility

rehabilitation 600,000 119,000 719,000

(xxxix) Raccoon

Creek State Park

(A) Park im-

provements 2,997,000 599,000 3,596,000

(B) Rehabili-

tation of flood

damage to dam,

roads, culverts

and bridges 232,000 232,000

(C) Additional

funds for Pro-

ject DGS 146-5;

park improve-

ments including

dredging

operations 500,000 100,000 600,000

(xl) Roosevelt

State Park

(A) Replacement

of Aqueduct and

Bridges 909,000 182,000 1,091,000

(B) Repair

Lodi lock

and bridge 720,000 180,000 900,000

(xli) Goddard

State Park

(A) Improve

Beach Area

and Facilities 1,300,000 260,000 1,560,000

(xlii) Canoe Creek

State Park

(A) Restoration

of lime kilns 100,000 25,000 125,000

(xliii) Ryerson

Station State

Park

(A) Construction

of an entrance

bridge to the

Main Day

Use Area 156,000 39,000 195,000

(xliv) Montgomery

County

(A) Upper Dublin

Township;

construction of

a demonstration

recycling trans-

fer station 1,500,000 300,000 1,800,000

(xlv) Allegheny

County

(A) Kilbuck

Township;

waterline

extension 80,000 20,000 100,000

(xlvi) Clearfield

County

(A) Beccoria

Village;

water supply

improvements 150,000 30,000 180,000

(B) Brisbin Boro;

dam improvements 75,000 25,000 100,000

(C) Houtzdale Boro;

water supply

improvements 450,000 90,000 540,000

(D) Pike Township;

water supply

improvements 200,000 40,000 240,000

(E) Development

of water supply

in Moshannon

Valley 447,000 53,000 500,000

(xlvii) ((xlvii) repealed July 11, 1989,

P.L.320, No.54)

(xlviii) Pennsylvania

Center for the

Performing Arts

(A) Design and

Construction of

a Concert Shell

in East

Stroudsburg 5,500,000 500,000 6,000,000

(6) Department of

General Services $68,106,240 $6,661,760 $74,768,000

(i) Capitol

Complex

(A) Water-

proofing of

underground

garage 2,200,000 440,000 2,640,000

(B) Renovation

and conversion

of Old Museum

Building for

Administrative

Offices, Pro-

ject DGS 946-2.

The base con-

struction

authorization

includes

$4,500,000

for support

systems and

plaza area

construction

tied into

Project DGS

948-12;

Capitol

Addition. This

project is

intended to

replace the

$5,604,031

previously

authorized

for the

renovation

and conversion

of the Old

Museum

Building 18,388,740 3,678,260 22,067,000

(ii) David

Lawrence

Convention Center,

Pittsburgh

(A) Improvements

to lobby and

all meeting

rooms 260,000 26,000 286,000

(iii) Environmen-

tal Resources

Harrisburg Re-

gional Office

and Laboratory

Building

(A) Construc-

tion of a Re-

gional Office

and Laboratory

Building,

Dauphin

County 5,600,000 1,400,000 7,000,000

(iv) Delaware County

(A) City of

Chester: State

Office Building,

Land Acquisi-

tion and Con-

struction 5,500,000 1,100,000 6,600,000

(v) County of

Allegheny

(A) Development

by the Board of

County Commissioners

of an adult

multipurpose vocational

and arts facility

with emphasis on

high technology

retraining 2,000,000 2,000,000

(vi) Cambria

County War Memorial,

Johnstown

(A) Renovation

and Repairs to

Memorial 157,500 17,500 175,000

(vii) City of

Scranton

(A) Steamtown

USA - land

acquisition,

site prepara-

tion and improve-

ments for railroad

exhibition 2,000,000 2,000,000

(B) Civic

arena - land

acquisition,

design, con-

struction and

startup costs 25,000,000 25,000,000

(viii) City of

Scranton and

County of

Lackawanna

(A) Sports

stadium -

land acquisi-

tion, design,

construction and

startup costs 7,000,000 7,000,000

(7) Department of

Health $21,500,000 $4,300,000 $25,800,000

(i) Diagnostic

and Rehabilitation

Center

(A) Additional

funds for

DGS 522-1 for

construction of

a residential

facility for

females 2,500,000 500,000 3,000,000

(ii) St. Christopher's

Hospital for

Children

(A) Site develop-

ment and construc-

tion of pediatric

treatment

and teaching

facilities 19,000,000 3,800,000 22,800,000

(8) Historical and

Museum

Commission $2,299,500 $687,500 $2,987,000

(i) Cornwall Iron

Furnace

(A) Restoration 146,000 48,000 194,000

(ii) Eckley Miners'

Village

(A) Structural

Stabilization and

Restoration 375,000 125,000 500,000

(iii) Ephrata

Cloister

(A) Structural

Restoration 75,000 25,000 100,000

(iv) Fort Pitt

Museum

(A) Wall and

Roof

Restoration 77,000 24,000 101,000

(v) Flagship Niagara

(A) Restoration of

Flagship Niagara 750,000 250,000 1,000,000

(vi) Railroad

Museum of

Pennsylvania

(A) Construc-

tion of Sheds

to Cover

Locomotive

Exhibits 500,000 125,000 625,000

(vii) Commonwealth

Conservation Center,

Dauphin County

(A) Renovation

of space for a

conservation

facility at

Tenth and

Market Streets

in Harrisburg 112,500 37,500 150,000

(viii) Washington

Crossing

Historic Park

(A) Additional

funds for

completion of

DGS 966-10 14,000 3,000 17,000

(ix) City of

Easton

(A) Construction

of a new facility

for the Easton

Canal Museum 250,000 50,000 300,000

(9) Department of

Military Affairs $2,111,000 $296,000 $2,407,000

(i) Lewisburg

National Guard

Armory

(A) Addition and

Renovation of

Armory 178,000 35,000 213,000

(ii) Norristown

(Belvoir Road)

National Guard

Armory

(A) Addition and

Renovation of

Armory 626,000 125,000 751,000

(iii) Pennsylvania

Soldiers' and

Sailors' Home

(A) Installation of

Air Conditioning in

Nursing Care Unit and

Domiciliary Dining

Room and Addition

of Steam Table

Unit and Hood in

Domiciliary Dining

Room 185,000 185,000

(iv) Hollidaysburg

Veterans' Home

(A) Air conditioning

of patient's

quarters 800,000 68,000 868,000

(v) Hollidaysburg

Veterans' Home

(A) Construction

of new parking

lot at Eisenhower

Hall and

resurfacing of

existing

blacktopping 72,000 18,000 90,000

(vi) Mansfield

National Guard

Armory

(A) Addition

and Renovation

of Armory 250,000 50,000 300,000

(10) Department of

Public Welfare $36,959,000 $8,605,000 $45,564,000

(i) Harrisburg

State Hospital

(A) Department

of Public Welfare

Computer Facility -

Phase II Construc-

tion 7,800,000 1,480,000 9,280,000

(ii) Allentown State

Hospital

(A) Sewage Lines 135,000 27,000 162,000

(iii) Farview State

Hospital

(A) Coal Bunker 486,000 97,000 583,000

(iv) Norristown

State Hospital

(A) Boiler Plant

Improvements -

Phase II 864,000 173,000 1,037,000

(v) Torrance State

Hospital

(A) Coal Storage

Area 108,000 22,000 130,000

(B) Additional

funds for Project

DGS 513-21; Alter-

ations to Boiler

Plant 273,000 27,000 300,000

(vi) Warren State

Hospital

(A) Renovate Bath-

Restroom Areas

in Main Building 324,000 65,000 389,000

(vii) Selinsgrove

Center

(A) Renovate Bath

Areas in Units 1

and 6 279,000 56,000 335,000

(viii) Eastern

Pennsylvania

Psychiatric

Institute

(A) Renovations of

Children's Unit 1,280,000 320,000 1,600,000

(B) Renovations

to research

space on

floors 6, 7

and 8 of

Main Tower

Building 2,320,000 580,000 2,900,000

(C) New Education

Facility 2,200,000 550,000 2,750,000

(D) Office and

Conference

Areas 280,000 70,000 350,000

(E) Expansion

of animal

facility 320,000 80,000 400,000

(ix) Western

Psychiatric Insti-

tute and Clinic -

Children and

Youth Center

(A) Construction

of a 100,000

square foot

building on top

of the current

garage 20,000,000 5,000,000 25,000,000

(x) Nanticoke

State Hospital

(A) Renovations,

Including the

Elevator System,

the Emergency

Entrance and

Updating the

Lighting System 290,000 58,000 348,000

(11) Pennsylvania

State Police $1,563,000 $212,000 $1,775,000

(i) Troop Headquar-

ters at Bethlehem

(A) Renovate and

Expand Headquar-

ters Building 478,000 96,000 574,000

(ii) Barracks at

Hollidaysburg

(A) Renovation

and expansion

of barracks 485,000 116,000 601,000

(iii) Substa-

tion in

Montgomery

County

(A) Additional

funds for

DGS 228-1 600,000 600,000

(12) Department of

Transportation $3,910,000 $859,000 $4,769,000

(i) Chester County

Highway Maintenance

Building

(A) Renovation and

Addition 170,000 34,000 204,000

(ii) Crawford

County

(A) Causeway

between Andover,

Ohio (T.R.85) and

Espyville,

Pennsylvania (T.R.285)

across the Pyma-

tuning Reservoir,

Shenango Town-

ship, Rip-Rap and

guide rail

installation 140,000 140,000

(iii) Rostraver

Township Airport,

Westmoreland

County

(A) Waterline

extensions and

sewer

facilities 1,300,000 325,000 1,625,000

(B) Improvements

to runways and

runway lighting 800,000 200,000 1,000,000

(iv) Westmoreland

County Airport

Authority

(A) Addition and

Expansion of

Airport System,

including ac-

quisition and

improvement 1,500,000 300,000 1,800,000

Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.

Compiler's Note: The Department of Environmental Resources, referred to in this section, was abolished by Act 18 of 1995. Its functions were transferred to the Department of Conservation and Natural Resources and the Department of Environmental Protection.

Section 3. Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

ProjectTotal
Project
Allocation
(1) Department of
Education$6,527,000
(i) Bloomsburg
University
(A) Human
Resources
Building
Furniture
and Equipment1,391,000
(ii) Indiana
University of
Pennsylvania
(A) Furniture
and Original
Equipment for
Safety Science
Building550,000
(iii) Shippensburg
University
(A) Renovation
of Old Main -
DGS 412-36
Original Fur-
nishings and
Equipment417,000
(iv) Temple
University
(A) Dental
School Phase
II - DGS
1104-32
Original
Equipment4,032,000
(v) University
of Pittsburgh
(A) Bradford
Campus, Project
No. DGS 1103-33
Library and Ad-
ministration
Building. In
addition to
funds previously
appropriated137,000
(2) Department of
General Services$5,500,000
(i) Capitol
Complex
(A) Original
Furnishings and
Equipment for
Project No.
DGS 948-12,
Capitol Addition
Building5,500,000
(3) Department of
Military Affairs$155,000
(i) Hollidaysburg
Veterans' Home
(A) Laundry
facilities;
original
equipment155,000
(4) Department of
Public Welfare$3,405,000
(i) Eastern
Pennsylvania
Psychiatric
Institute
(A) Original
furniture and
equipment for
the animal
facility and
the renovated
research
space in the
Main Tower
Building3,300,000
(ii) Ashland State
General Hospital
(A) Original
furniture and
equipment for
the Intensive
Care Unit Project105,000

Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.

Section 4. Itemization of redevelopment assistance project.

A capital project in the category of redevelopment assistance projects for capital grants by the Department of Community Affairs, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and to be financed by the incurring of debt, is hereby itemized, together with its estimated financial costs, as follows:

ProjectBase Project AllocationDesign & Contin- genciesTotal Project Allocation
(1) City of
Philadelphia
(A) Convention
Center - bounded
by Market, Race,
11th and 13th
Streets43,900,00043,900,000
(2) Easton
(A) Restoration
of Municipal Civic
and Exhibition
Center212,00053,000265,000

Compiler's Note: The Department of Community Affairs, referred to in this section, was abolished by Act 58 of 1996 and its functions were transferred to the Department of Community and Economic Development.

Section 5. Itemization of transportation assistance projects.

(a) Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

Base Land Design and Total

Project Project Acqui- Contingency Project

Allocation sition Allocation Allocation

(1) Depart-

ment of

Transporta-

tion

(i) Blair

County and

Centre County;

Acquisition

and Rehabili-

tation of the

Following

Rail Lines by

the SEDA -

COG Joint

Rail Authority:

Tyrone-

Milesburg,

Mile Post

3.00 to

32.00

Bellefonte

Secondary Line,

Mile Post

30.8 to 42.5

Pleasant

Gap Industri-

al Track $300,000 $350,000 $650,000

(ii) Northumberland,

Montour and

Columbia Counties:

(A) Acquisi-

tion and re-

habilitation

of the Conrail

Bloomsburg

Branch by the

SEDA - COG

Joint Rail

Authority,

Mile Post

177.5 to

213.45 150,000 200,000 350,000

(iii) Clinton

County:

(A) Wayne Twp.

Construction

of a rail

spur to

the Clinton

County In-

dustrial

Park by

the Clinton

County In-

dustrial

Development

Authority

at McElhat-

tan, Length

0.6 Mile 298,000 42,000 340,000

(B) Bald Eagle

and Cast-

anea Twps.

Capital acqui-

sition costs for

the Mill Hall

Branch Milepost

11.1 to Milepost

13.0 by

the Industrial

Development

Corporation of

Clinton

County 331,000 127,000 60,000 518,000

(iv) Erie, Forest,

Elk and Warren

Counties:

(A) Rehabilitation

and improvement

of the former

Conrail line

between Erie

and St. Marys

to FRA Class III

Standards 3,778,000 3,778,000

(v) Schuylkill

County:

(A) For acquisi-

tion, rehabilita-

tion and con-

struction of the

following adjoining

lines: Shimer

Running Track,

Milepost 148.3 to

Milepost 158.4;

Catawissa Branch

Line, Milepost

103.5 to Milepost

109.0; and Tamaqua,

Hazleton and

Northern Branch

Line, Milepost

109.0 to Milepost

109.5 2,000,000 500,000 2,500,000

(b) Additional capital projects in the category of transportation assistance projects with respect to which an interest is to be acquired in or constructed by the Pennsylvania Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, and the total additional amount authorized for the transportation assistance projects, as follows:

Base Design and Total

Project Project Contingency Project

Allocation Allocation Allocation

(1) Port Authority

of Allegheny County

(i) Provision of

commuter rail

service from

Pittsburgh through

Harrison Township

(A) Purchase of

rail cars $2,000,000 $400,000 $2,400,000

(B) Construction

of station stops 100,000 20,000 120,000

(2) City of

Philadelphia

(i) Eastwick Sta-

tion Project 752,000 752,000

This project is intended to replace the previously authorized projects; Eastwick High-Speed Surface Line in Act 1970-263; Eastwick High-Speed Subway-Surface Line Relocation in Act 1974-346; and additional funds for PT- , Eastwick High-Speed Line Relocation in Act 1976-138.

Section 6. Itemization of Fish Commission projects.

Additional capital projects in the category of public improvement projects, to be acquired or constructed by the Pennsylvania Fish Commission, its successors or assigns, and to be financed from the current revenues of the Fish Fund pursuant to executive authorizations, are hereby itemized, together with their respective estimated financial costs, as follows:

Base Design and Total

Project Project Contingency Project

Allocation Allocation Allocation

(1) Pennsylvania

Fish Commission $2,010,000 $488,000 $2,498,000

(i) Construction

of boat

launching

area in

North East

Township,

Erie County 1,525,000 381,000 1,906,000

(ii) Construction

of a boat

launching ramp

and access

area, including

stream bank

protection

adjacent to

the ramp and

two short

breakwaters or

parallel groins

with limited

amount of

channel dredging

at the Elk

Creek Access

Area in Girard

Township,

Erie County 285,000 57,000 342,000

(iii) Construction of a

fish hatchery on

land donated to the

Fish Commission by

the Port of Erie 200,000 50,000 250,000

Compiler's Note: The name of the Pennsylvania Fish Commission, referred to in subsec. (e), was changed to the Pennsylvania Fish and Boat Commission by Act 39 of 1991. See 30 Pa.C.S. § 308 (relating to designation of commission).

Section 7. Heating systems.

(a) Any heating system or heating unit installed as part of any of the public improvement projects itemized in section 2 shall be fueled by coal.

(b) Any heating system or heating unit shall be exempt from the requirement of subsection (a) if the Department of General Services determines that the application of subsection (a) to that heating system or heating unit would violate existing or reasonably anticipated environmental laws or regulations or would not be cost effective. The Department of General Services shall report to the House and Senate Appropriations Committees the basis for any determination that a heating system or heating unit shall be exempt from the requirement of subsection (a).

(c) This section shall not apply to the public improvement projects itemized in section 2 for cogeneration facilities at Indiana University of Pennsylvania and for the installation of an oil-fired boiler at the Main Campus of Pennsylvania State University and the boiler's conversion to operate on a mixture of coal and water. This section also shall not apply to any other public improvement project itemized in section 2 if the fuel to be used in that project is specified in section 2.

(d) For the purposes of this section, "coal" includes coal, a synthetic derived in whole or in part from coal, or a mixture which includes coal or is derived in whole or in part from coal.

Section 8. Transfer of prior authorization.

(a) In addition to the amount authorized in section 2(2)(xi), an additional $5,500,000 previously authorized for land acquisitions is also transferred to the construction authorization contained in section 2(2)(xi).

(b) The additional $600,000 for the project itemized in section 2(11)(iii)(A) includes $106,732 previously allocated by administrative action. The $493,268 balance shall be provided from excess funds available in the unallocated reserve of the Capital Facilities Fund.

Section 9. Debt authorizations.

(a) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $632,521,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.

(b) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $15,587,000 as may be found necessary to carry out the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.

(c) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $44,165,000 as may be found necessary to carry out the redevelopment assistance projects specifically itemized in a capital budget.

(d) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $11,408,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

Section 10. Issue of bonds.

The indebtedness herein authorized shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, Auditor General and State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 11.

Section 11. Estimated useful life of projects.

The General Assembly states that the estimated useful life of the public improvement projects heretofore itemized is as follows:

(1) Public Improvement Projects:

(i) Forest service roads, 10 years.

(ii) All other projects, 30 years.

(2) Furniture and Equipment Projects, 10 years.

(3) Redevelopment Assistance Projects, 30 years.

(4) Transportation Assistance Projects:

(i) Rolling stock, 15 years.

(ii) Passenger buses, 12 years.

(iii) Furniture and equipment, 10 years.

(iv) All others, 30 years.

The maximum term of the debt authorized to be incurred hereunder is 30 years.

Section 12. Appropriations.

(a) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $632,521,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(b) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $15,587,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(c) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $44,165,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.

(d) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Pennsylvania Department of Transportation in the maximum amount of $11,408,000 to be used by it exclusively to defray the financial costs of transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the Pennsylvania Department of Transportation the moneys as required and certified by it to be legally due and payable.

Compiler's Note: The Department of Community Affairs, referred to in subsec. (c), was abolished by Act 58 of 1996 and its functions were transferred to the Department of Community and Economic Development.

Section 13. Federal funds.

In addition to those funds appropriated in section 12, all moneys received from the Federal Government for the projects specifically itemized herein are also hereby appropriated for those projects.

Section 14. Temporary borrowing.

Notwithstanding any provision of this act or of the act of July 20, 1968 (P.L.550, No.217), known as the Capital Facilities Debt Enabling Act, issuing officials shall have the authority, under this act and any other capital budget act, to issue bonds or notes upon public or private sale or upon invitation at such prices and interest rates as the issuing authorities may in their discretion determine for a period or maturity not to exceed three months, in an amount not to exceed $15,000,000. For issuance of these bonds or notes, the issuing officials do not have to comply with the provisions of section 9 of the Capital Facilities Debt Enabling Act. The authority granted in this section shall expire four months from the effective date of the act providing for the capital budget for the fiscal year 1984-1985.

Section 15. Repeals.

Clause (8) of part VIII of section 2 of the act of August 14, 1963 (P.L.1032, No.451), entitled "An act amending the act of March 31, 1949 (P.L.372, No.34), entitled 'An act to promote the welfare of the people of the Commonwealth; creating The General State Authority as a body corporate and politic with power to construct, improve, equip, furnish, and operate projects, and to lease the same, and to fix fees, rentals, and charges for the use thereof; authorizing and regulating the issuance of bonds for said Authority, and providing for the payment of such bonds, and the rights of the holders thereof; and to enter into agreements with the Government of the United States or any Federal agency; and authorizing the Department of Property and Supplies to grant, assign, convey, or lease to the Authority lands of the Commonwealth and interests therein and to acquire lands therefor; granting the right of eminent domain; empowering The General State Authority to sell and convey projects and property to the Commonwealth; and providing that no debt of the Commonwealth shall be incurred in the exercise of any of the powers granted by this act,' increasing the powers and the borrowing capacity of the Authority, allocating the proceeds of such borrowing capacity, and regulating the leasing of projects constructed for State aided institutions," is hereby repealed. Any funds expended or encumbered under the authorization contained in the act of August 14, 1963, shall be transferred to the authorization in section 2(6)(B).

Project (49) of subdivision IX of clause A of section 2 of the act of November 27, 1970 (P.L.773, No.256), known as the Capital Budget Act for Fiscal Year 1969-1970, Public Improvement Project Itemization Supplement-General State Authority, is repealed.

Subproject (2) of project (k) of subclause III of clause B of section 1 of the act of December 18, 1980 (P.L.1252, No.228), entitled "A supplement to the act of October 6, 1980 (P.L.784, No.145), entitled 'An act providing for the capital budget for the fiscal year 1980-1981,' itemizing public improvement and furniture and equipment projects, to be constructed by the Department of General Services and transportation assistance projects to be acquired or constructed by the Pennsylvania Department of Transportation together with their estimated financial cost; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed by the Department of General Services or Department of Transportation, stating the estimated useful life of the projects; providing for the adoption of capital projects to be financed from current revenues of the Boating Fund and the Fish Fund and making an appropriation," is repealed.

Section 1.B.II(a)(1) and (2) of the act of December 6, 1982 (P.L.771, No.222), entitled "A supplement to the act of July 1, 1981 (P.L.142, No.47), entitled 'An act providing for the capital budget for the fiscal year 1981-1982,' itemizing public improvement and furniture and equipment projects to be constructed or acquired by the Department of General Services together with their estimated financial cost, authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed or acquired by the Department of General Services, stating the estimated useful life of the projects, repealing projects and making appropriations," are repealed.

Section 204(1)(ii) and (vi)(B) of the act of July 28, 1983 (P.L.141, No.38), entitled "An act providing for the adoption of capital projects to be financed from current revenues of the Game Fund; itemizing transportation assistance projects and highway projects to be acquired or constructed by the Department of Transportation together with its estimated financial cost; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects; stating the estimated useful life of the projects; itemizing a public improvement project to be constructed with its estimated financial cost and stating the estimated useful life of the project; and making appropriations," are repealed.

Section 16. Effective date.

This act shall take effect immediately.

VETOES

1984, MAY 18, P.L.263, NO.62

Act 62 was approved May 18, 1984, except as to the following:

Section 12. Appropriations.

(a) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $632,521,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

I approve this item in the amount of $310,907,000.

(b) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $15,587,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

I approve this item in the amount of $10,356,000.

(c) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $44,165,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.

I approve this item in the amount of $43,900,000.

I withhold my approval from the remainder of said appropriations and debt authorizations for the following reasons:

(1) Certain projects cannot be undertaken by the Commonwealth under provisions of the Capital Facilities Debt Enabling Act. These projects do not fall within the definitions of the various categories of capital projects contained therein. Some of these are worthy projects which are being funded through other mechanisms.

(2) Certain projects contained in the bill are maintenance or repair in nature. These projects are to preserve or restore existing assets rather than make an improvement or betterment, and as such cannot be bond funded.

(3) Certain projects contained in the bill have been authorized in previous capital acts so funding is already available for these projects.

(4) Certain projects are not of a sufficiently high priority to warrant the further indebtedness needed for their funding if we are to operate in a fiscally responsible manner. The unrestrained increase in the amount of bond funded authorizations could have a negative impact on the Commonwealth's bond rating thereby causing an increase in interest costs to the Commonwealth or limiting the availability of bond funds for high priority projects.

The projects to be deleted or reduced are as follows:

Section 2. Itemization of public improvement projects.


(3) Department of
Education
(i) Bloomsburg
University
(A) Rehabilitation
and Renovation of
Science Hall2,779,0001,190,0003,969,000

This item is approved in the sum of $3,335,000.

(ii) California
University
* * *
(B) Renovation
of Old Science
Building2,300,000350,0002,650,000

This item is to be deleted.

(C) Roof re-
placement180,00045,000225,000

This item is to be deleted.

(D) Removal of
asbestos154,00038,000192,000

This item is to be deleted.

(iii) Cheyney
University
* * *
(D) Renovations
of walkways,
roadways,
parking lots
and install-
ation of
campus security
lighting350,00070,000420,000
* * *

This item is to be deleted.

(iv) Clarion Univer-
sity
* * *
(D) Renovation
of stadium250,00050,000300,000

This item is to be deleted.

(E) Venango
Campus:
Remodeling and
refurbishing of
Montgomery Hall640,00060,000800,000

This item is to be deleted.

(v) East Strouds-
burg University
* * *
(B) Renovations
to Old Dining
Hall to Facilitate
Hotel and Resort
Management
Program1,440,000288,0001,728,000

This item is approved in the sum of $1,440,000.

(vi) Edinboro University
* * *
(B) Maintenance
Repair Projects3,749,000768,0004,517,000

This item is to be deleted.

(C) Roof re-
placement644,000161,000805,000

This item is to be deleted.

(D) Replacement
of windows,
framing and
caulking80,00020,000100,000

This item is to be deleted.

(vii) Indiana
University of
Pennsylvania
(A) Cogeneration
Facility8,350,0001,650,00010,000,000

This item is to be deleted.

(viii) Kutztown University
* * *
(C) Construction
of New Residence
Hall3,892,000779,0004,671,000
* * *

This item is to be deleted.

(E) Repair to
top structure
for Old Main,
Section F401,000100,000501,000
* * *

This item is to be deleted.

(x) Mansfield University
* * *
(C) Roof
replacement84,00016,000100,000
* * *

This item is to be deleted.

(E) Replacement
of piping for
showers for
Cedar Crest
Dormitory83,00017,000100,000

This item is to be deleted.

(xi) Millersville
University
(A) Replacement of
Classroom and Office
Facilities in
Myers Hall5,500,0001,100,0006,600,000
* * *

This item is to be deleted.

(xii) Shippensburg
University
* * *
(B) Roof replacement120,00030,000150,000
* * *

This item is to be deleted.

(xiii) Slippery Rock
University
* * *
(B) Replacement
of utility
structures
and renovation
of interior
structures1,708,000427,0002,135,000

This item is to be deleted.

(xiv) West Chester
University
(A) Replacement
Stoker for Central
Boiler Plant141,00015,000156,000

This item is to be deleted.

(B) Renovation of
Two Residence
Halls: Wayne Hall
and Goshen Hall360,00040,000400,000
* * *

This item is to be deleted.

(D) Replacement
of elevator
equipment in
Ramsey Hall86,00014,000100,000

This item is to be deleted.

(E) Renovation
of top structure
of Main Hall154,00039,000193,000

This item is to be deleted.

(xv) Pennsylvania
State University
(A) Renovation of
Laboratory Space
in Chandlee and
Mueller Buildings
at University
Park Campus5,000,0001,000,0006,000,000

This item is approved in the sum of $5,000,000.

(B) Renovation to
Mechanical
Engineering
Building and
Electrical
Engineering - West
Building at
University Park
Campus9,480,0001,896,00011,376,000

This item is approved in the sum of $9,480,000.

(C) Replacement
and Upgrading
of Scientific
and Engineering
Educational
Equipment in
Commonwealth
Projects at
University
Park Campus
and Commonwealth
Campuses - Phase I18,334,0003,666,00022,000,000

This item is to be deleted.

(D) Initial
Capital Outlay
for Computing,
Informational and
Telecommunications
Networks8,334,0001,666,00010,000,000
* * *

This item is to be deleted.

(F) Improvements
to buildings,
support systems
and grounds
at University
Park including
utilities distri-
bution overhaul,
improve steam
lines, manholes,
condensate lines,
air lines and
pumps983,000197,0001,180,000

This item is to be deleted.

(G) Improvements
to waste water
treatment plant,
Phase III2,675,000535,0003,210,000

This item is approved in the sum of $2,675,000.

(H) Additions
to Animal
Industries
Building and
renovation of
Borland
Laboratory4,750,000950,0005,700,000
* * *

This item is to be deleted.

(N) Behrend
College,
Academic and
Library
Buildings7,360,0001,840,0009,200,000
* * *

This item is to be deleted.

(P) Capitol
Campus, repair
and replacement
of heating
system325,00065,000390,000

This item is to be deleted.

(Q) Fayette
Campus, repair
or replace
Library HVAC
System160,00032,000192,000

This item is to be deleted.

(R) Hazleton
Campus, repair
structural
problems in
Physical
Education
Buildings160,00032,000192,000

This item is to be deleted.

(S) McKeesport
Campus, replace
gym floor110,00022,000132,000

This item is to be deleted.

(T) Ogontz
Campus, replace
gym floor187,00037,000224,000

This item is to be deleted.

(U) Shenango
Valley Campus,
construction of
multipurpose in-
structional
building5,000,0001,000,0006,000,000

This item is to be deleted.

(V) Worthington-
Scranton Campus,
replace gym floor120,00024,000144,000

This item is to be deleted.

(xvi) University of
Pittsburgh
(A) Multipurpose
Academic and
Residence
Complex23,919,0004,784,00028,703,000

This item is to be deleted.

(B) Renewal
and replacement
of fixed
scientific
equipment in
Commonwealth
buildings7,540,0001,660,0009,200,000

This item is to be deleted.

(C) Upgrading
and replacement
of equipment
for School of
Engineering6,600,0001,320,0007,920,000

This item is to be deleted.

(D) Greensburg
Campus
(I) Construction
of library
building3,861,0001,089,0004,950,000

This item is to be deleted.

(II) Construction
of Common
Facilities
Building,
Project No.
DGS 1103-214,141,000828,0004,969,000

This item is to be deleted.

(E) Titusville
Campus
(I) Land Acquisi-
tion for Science
Building500,00050,000550,000

This item is to be deleted.

(II) Construction
of Science
Building4,300,000860,0005,160,000

This item is to be deleted.

(F) Bradford
Campus
(I) Renovation
of Swartz
Hall, Project
No. DGS 1103-A,
Fisher Hall,
Project No.
DGS 1103-20
and Common
Facilities
Building,
Project No.
DGS 1103-30900,000900,000

This item is to be deleted.

(xvii) Temple
University
(A) Replacement
and Upgrading
of Educational
Equipment in
Commonwealth
Projects9,795,0001,959,00011,754,000

This item is to be deleted.

(B) Replacement
and Upgrading
of Equipment in
Engineering
Facilities4,556,000910,0005,466,000

This item is to be deleted.

(C) Computing,
Informational
and Telecom-
munications
Network11,000,0002,200,00013,200,000
* * *

This item is to be deleted.

(E) Baptist Temple
Renovation -
Project No. DGS
1104-42 - Addi-
tional funds2,542,560508,4403,051,000

This item is to be deleted.

(F) Multipurpose
student facility -
Ambler Campus6,300,0001,260,0007,560,000

This item is to be deleted.

(G) Armory Renova-
tion - Project
No. DGS
1104-41 - Addi-
tional funds2,755,000551,0003,306,000
* * *

This item is to be deleted.

(xxiii) Beaver County
Community College
(A) Rehabilita-
tion and renova-
tion of student
parking lot80,00020,000100,000

This item is to be deleted.

(xxiv) Dropsie
College
(A) Building
Repairs100,000100,000
* * *

This item is to be deleted.

(5) Department of
Environmental Re-
sources
* * *
(xx) City of
Greensburg and
Hempfield Town-
ship - Westmore-
land County
(A) Flood pro-
tection; tri-
butary Jack's
Run; road
section 1:
Oxford Drive
to Crestview
Drive298,000298,000
* * *

This item is to be deleted.

(xxii) Millvale
Borough -
Allegheny County
(A) Stream
wall replacement
on Girty's Run312,00062,000374,000

This item is to be deleted.

(xxiii) Shaler
Township -
Allegheny
County
(A) Pine Creek
flood control
project on
Glenshaw and
Shaler Flats1,250,000250,0001,500,000
* * *

This item is approved in the sum of $767,000.

(xxviii) Borough of
Turtle Creek -
Allegheny County
(A) Channel Rectifi-
cation on Saw Mill Run
(Relocation of
Utilities so
Project can
Proceed as
Previously
Authorized)180,00045,000225,000
* * *

This item is to be deleted.

(xxxix) Raccoon
Creek State Park
* * *
(B) Rehabili-
tation of flood
damage to dam,
roads, culverts
and bridges232,000232,000
(C) Additional
funds for Pro-
ject DGS 146-5;
park improve-
ments including
dredging
operations500,000100,000600,000
* * *

This item is to be deleted.

(xliv) Montgomery
County
(A) Upper Dublin
Township;
construction of
a demonstration
recycling trans-
fer station1,500,000300,0001,800,000

This item is to be deleted.

(xlv) Allegheny
County
(A) Kilbuck
Township;
waterline
extension80,00020,000100,000

This item is to be deleted.

(xlvi) Clearfield
County
(A) Beccoria
Village;
water supply
improvements150,00030,000180,000

This item is to be deleted.

(B) Brisbin Boro;
dam improvements75,00025,000100,000

This item is to be deleted.

(C) Houtzdale Boro;
water supply
improvements450,00090,000540,000

This item is to be deleted.

(D) Pike Township;
water supply
improvements200,00040,000240,000

This item is to be deleted.

(E) Development
of water supply
in Moshannon
Valley447,00053,000500,000

This item is to be deleted.

(xlvii) Mine
subsidence
(A) For grants
and loans
to those
persons eligible
to receive
assistance
pursuant to the
act of November 8,
1971 (P.L.532,
No.136), en-
titled "An
act providing
assistance
to persons
suffering damage
from mine
subsidence"250,000250,000
* * *

This item is to be deleted.

(6) Department of
General Services
* * *
(iii) Environmen-
tal Resources
Harrisburg Re-
gional Office
and Laboratory
Building
(A) Construc-
tion of a Re-
gional Office
and Laboratory
Building,
Dauphin
County5,600,0001,400,0007,000,000

This item is to be deleted.

(iv) Delaware County
(A) City of
Chester: State
Office Building,
Land Acquisi-
tion and Con-
struction5,500,0001,100,0006,600,000

This item is to be deleted.

(v) County of
Allegheny
(A) Development
by the Board of
County Commissioners
of an adult
multipurpose vocational
and arts facility
with emphasis on
high technology
retraining2,000,0002,000,000

This item is to be deleted.

(vi) Cambria
County War Memorial,
Johnstown
(A) Renovation
and Repairs to
Memorial157,50017,500175,000

This item is to be deleted.

(vii) City of
Scranton
(A) Steamtown
USA - land
acquisition,
site prepara-
tion and improve-
ments for railroad
exhibition2,000,0002,000,000

This item is to be deleted.

(B) Civic
arena - land
acquisition,
design, con-
struction and
startup costs25,000,00025,000,000

This item is to be deleted.

(viii) City of
Scranton and
County of
Lackawanna
(A) Sports
stadium -
land acquisi-
tion, design,
construction and
startup costs7,000,0007,000,000

This item is to be deleted.

(7) Department of
Health
(i) Diagnostic
and Rehabilitation
Center
(A) Additional
funds for
DGS 522-1 for
construction of
a residential
facility for
females2,500,000500,0003,000,000

This item is to be deleted.

(ii) St. Christopher's
Hospital for
Children
(A) Site develop-
ment and construc-
tion of pediatric
treatment
and teaching
facilities19,000,0003,800,00022,800,000

This item is to be deleted.

(8) Historical and
Museum Commission
* * *
(iii) Ephrata
Cloister
(A) Structural
Restoration75,00025,000100,000

This item is to be deleted.

(iv) Fort Pitt
Museum
(A) Wall and
Roof
Restoration77,00024,000101,000
* * *

This item is to be deleted.

(ix) City of Easton
(A) Construction
of a new facility
for the Easton
Canal Museum250,00050,000300,000

This item is to be deleted.

(9) Department of
Military Affairs
* * *
(v) Hollidaysburg
Veterans' Home
(A) Construction
of new parking
lot at Eisenhower
Hall and
resurfacing of
existing
blacktopping72,00018,00090,000
* * *

This item is to be deleted.

(10) Department of
Public Welfare
* * *
(viii) Eastern
Pennsylvania
Psychiatric
Institute
(A) Renovations of
Children's Unit1,280,00020,0001,600,000

This item is to be deleted.

(B) Renovations
to research space
on floors 6,7 and
8 of Main Tower
Building2,320,000580,0002,900,000

This item is to be deleted.

(C) New Education
Facility2,200,000550,0002,750,000

This item is to be deleted.

(D) Office and
Conference
Areas280,00070,000350,000

This item is to be deleted.

(E) Expansion of
animal facility320,00080,000400,000

This item is to be deleted.

(ix) Western
Psychiatric Insti-
tute and Clinic -
Children and
Youth Center
(A) Construction
of a 100,000
square foot
building on top
of the current
garage20,000,0005,000,00025,000,000
* * *

This item is to be deleted.

(12) Department
of Transportation
* * *
(ii) Crawford
County
(A) Causeway
between Andover,
Ohio (T.R.85) and
Espyville,
Pennsylvania (T.R.285)
across the Pyma-
tuning Reservoir,
Shenango Town-
ship, Rip-Rap and
guide rail
installation140,000140,000

This item is to be deleted.

(iii) Rostraver
Township Airport,
Westmoreland
County
(A) Waterline
extensions and
sewer
facilities1,300,000325,0001,625,000

This item is to be deleted.

(B) Improvements
to runways and
runway lighting800,000200,0001,000,000

This item is to be deleted.

(iv) Westmoreland
County Airport
Authority
(A) Addition and
Expansion of
Airport System,
including ac-
quisition and
improvement1,500,000300,0001,800,000

This item is to be deleted.

Section 3. Itemization of furniture and equipment projects

* * *
(1) Department of
Education
(i) Bloomsburg
University
(A) Human
Resources
Building
Furniture
and Equipment1,391,000

This item is approved in the sum of $882,000.

(ii) Indiana
University of
Pennsylvania
(A) Furniture
and Original
Equipment for
Safety Science
Building550,000

This item is approved in the sum of $325,000.

(iii) Shippensburg
University
(A) Renovation
of Old Main -
DGS 412-36
Original Fur-
nishings and
Equipment417,000

This item is approved in the sum of $360,000.

(iv) Temple
University
(A) Dental
School Phase
II - DGS 1104-32
Original
Equipment4,032,000

This item is approved in the sum of $3,132,000.

(v) University
of Pittsburgh
(A) Bradford
Campus, Project
No. DGS 1103-33
Library and Ad-
ministration
Building. In
addition to
funds previously
appropriated137,000
* * *

This item is approved in the sum of $52,000.

(3) Department of
Military Affairs
(i) Hollidaysburg
Veterans' Home
(A) Laundry
facilities;
original
equipment155,000

This item is to be deleted.

(4) Department of
Public Welfare
(i) Eastern
Pennsylvania
Psychiatric
Institute
(A) Original
furniture and
equipment for
the animal
facility and
the renovated
research space in
the Main Tower
Building3,300,000
* * *

This item is to be deleted.

Section 4. Itemization of redevelopment assistance project.

* * *
(2) Easton
(A) Restoration
of Municipal Civic
and Exhibition
Center212,00053,000265,000

This item is to be deleted.

DICK THORNBURGH