(Art. 8 para. 3 let. a WRFA)
- The operator must notify the supervisory authority of maintenance work in good time.
- During work on spillways and outlet works, the operator must:
- guarantee sufficient flood safety; and
- ensure that the level of the reservoir can be lowered again at short notice in the event of imminent danger.