814.201WPOFederal Council OrdinanceJan 1, 1999Original source
The cantons shall submit a plan to the FOEN of their measures to remediate the bed load budget in accordance with the procedure described in Annex 4a number 3.
The persons responsible for installations must allow access to the authority responsible for the plan and provide the required information, in particular on:
the details and the designation of the installations and in the case of hydropower plants the individual parts of the installation;
how the bed load is dealt with;
the measures carried out and the planned in order to improve the bed load budget;
the available results of the study of the bed load budget;
the planned structural and operational changes to the installation.