Whether the defendant must tolerate removal of the water connection pipe insofar as it is located on the plaintiff's property.
The defendant must tolerate removal of the pipe on the plaintiff's property.
18 C 563/94•Removal of a Shared Water Pipe and Duty to Connect
18 C 563/94Court of First InstanceMar 16, 1995Civil lawPartially granted
Extracted by Omnilex
In this first-instance civil judgment, the Bonn Local Court ordered the defendant to tolerate removal of the water connection pipe running between two semi-detached houses, to the extent that the pipe was on the plaintiff's property. The court also declared that the plaintiff was not required to arrange connection of the house in C to the public water network. It dismissed the remainder of the claim and ordered the defendant to bear the costs of the proceedings. The judgment followed an oral hearing held on 26 January 1995 and was provisionally enforceable against security of DM 9,500.
Entscheidungsdatum: 1995-03-16
Aktenzeichen: 18 C 563/94
ECLI: ECLI:DE:AGBN:1995:0316.18C563.94.00
Dokumenttyp: Urteil
Spruchkörper: 18 C
In dem Rechtsstreit
pp
hat das Amtsgericht Bonn
auf die mündliche Verhandlung vom 26.01.1995
für R e c h t erkannt:
Die Beklagte wird verurteilt, die Entfernung der zwischen den beiden Doppelhaushälften Mweg ## und Mweg ## verlaufenden Wasserverbindungsleitung zu dulden, soweit diese sich auf dem Grundstück des Klägers befindet.
2 .
Es wird festgestellt, daß der Kläger nicht verpflichtet ist, für einen Anschluß des Hauses Mweg ## in C an das öffentliche Leitungswassernetz zu sorgen.
Im übrigen wird die Klage abgewiesen.
,,,..... Die Kosten des Rechtsstreits werden der Beklagten auferlegt.
s.
Das Urteil ist gegen Sicherheitsleistung in Höhe von 9.500,00 DM vorläufig vollstreckbar.
Whether the defendant must tolerate removal of the water connection pipe insofar as it is located on the plaintiff's property.
The defendant must tolerate removal of the pipe on the plaintiff's property.
Whether the plaintiff is obliged to arrange connection of the house in C to the public water network.
The plaintiff is not obliged to arrange that connection.
The remaining part of the plaintiff's claim.
The remaining claim was dismissed.
Allocation of the costs of the proceedings.
The defendant must bear the costs of the proceedings.
Free consultation, no commitment
Describe your situation. Our team will contact you by email about your consultation.
Connect Omnilex to search the legal corpus from your AI assistant.