32007L0066•Directive 2007/66/EC of the European Parliament and of the Council of 11 December 2007 amending Council Directives 89/665/EEC and 92/13/EEC with regard to improving the effectiveness of review procedures concerning the award of public contracts (Text with EEA relevance )
32007L0066DirectiveJan 9, 2008
of 11 December 2007
amending Council Directives 89/665/EEC and 92/13/EEC with regard to improving the effectiveness of review procedures concerning the award of public contracts
(Text with EEA relevance)
THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty establishing the European Community, and in particular Article 95 thereof,
Having regard to the proposal from the Commission,
Having regard to the opinion of the European Economic and Social Committee 1 ,
Having regard to the opinion of the Committee of the Regions 2 ,
Acting in accordance with the procedure laid down in Article 251 of the Treaty 3 ,
Whereas:
(1) Council Directives 89/665/EEC of 21 December 1989 on the coordination of the laws, regulations and administrative provisions relating to the application of review procedures to the award of public supply and public works contracts 4 and 92/13/EEC of 25 February 1992 coordinating the laws, regulations and administrative provisions relating to the application of Community rules on the procurement procedures of entities operating in the water, energy, transport and telecommunications sectors 5 concern the review procedures with regard to contracts awarded by contracting authorities as referred to in Article 1(9) of Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts 6 and contracting entities as referred to in Article 2 of Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors 7 . Directives 89/665/EEC and 92/13/EEC are intended to ensure the effective application of Directives 2004/18/EC and 2004/17/EC.
(2) Directives 89/665/EEC and 92/13/EEC therefore apply only to contracts falling within the scope of Directives 2004/18/EC and 2004/17/EC as interpreted by the Court of Justice of the European Communities, whatever competitive procedure or means of calling for competition is used, including design contests, qualification systems and dynamic purchasing systems. According to the case law of the Court of Justice, the Member States should ensure that effective and rapid remedies are available against decisions taken by contracting authorities and contracting entities as to whether a particular contract falls within the personal and material scope of Directives 2004/18/EC and 2004/17/EC.
(3) Consultations of the interested parties and the case law of the Court of Justice have revealed a certain number of weaknesses in the review mechanisms in the Member States. As a result of these weaknesses, the mechanisms established by Directives 89/665/EEC and 92/13/EEC do not always make it possible to ensure compliance with Community law, especially at a time when infringements can still be corrected. Consequently, the guarantees of transparency and non-discrimination sought by those Directives should be strengthened to ensure that the Community as a whole fully benefit from the positive effects of the modernisation and simplification of the rules on public procurement achieved by Directives 2004/18/EC and 2004/17/EC. Directives 89/665/EEC and 92/13/EEC should therefore be amended by adding the essential clarifications which will allow the results intended by the Community legislature to be attained.
(4) The weaknesses which were noted include in particular the absence of a period allowing an effective review between the decision to award a contract and the conclusion of the contract in question. This sometimes results in contracting authorities and contracting entities who wish to make irreversible the consequences of the disputed award decision proceeding very quickly to the signature of the contract. In order to remedy this weakness, which is a serious obstacle to effective judicial protection for the tenderers concerned, namely those tenderers who have not yet been definitively excluded, it is necessary to provide for a minimum standstill period during which the conclusion of the contract in question is suspended, irrespective of whether conclusion occurs at the time of signature of the contract or not.
(5) The duration of the minimum standstill period should take into account different means of communication. If rapid means of communication are used, a shorter period can be provided for than if other means of communication are used. This Directive only provides for minimum standstill periods. Member States are free to introduce or to maintain periods which exceed those minimum periods. Member States are also free to decide which period should apply, if different means of communication are used cumulatively.
(6) The standstill period should give the tenderers concerned sufficient time to examine the contract award decision and to assess whether it is appropriate to initiate a review procedure. When the award decision is notified to them, the tenderers concerned should be given the relevant information which is essential for them to seek effective review. The same applies accordingly to candidates to the extent that the contracting authority or contracting entity has not made available in due time information about the rejection of their application.
(7) Such relevant information includes, in particular, a summary of the relevant reasons as set out in Article 41 of Directive 2004/18/EC and Article 49 of Directive 2004/17/EC. As the duration of the standstill period varies from one Member State to another, it is also important that the tenderers and candidates concerned should be informed of the effective period available to them to bring review proceedings.
(8)
(9) Finally, in cases of contracts based on a framework agreement or a dynamic purchasing system, a mandatory standstill period could have an impact on the efficiency gains intended by those tendering procedures. Member States should be able therefore, instead of introducing a mandatory standstill period, to provide for ineffectiveness as an effective sanction in accordance with Article 2d of both Directives 89/665/EEC and 92/13/EEC for infringements of the second indent of the second subparagraph of Article 32(4) and of Article 33(5) and (6) of Directive 2004/18/EC, and of Article 15(5) and (6) of Directive 2004/17/EC.
(10)
(11) When a Member State requires a person intending to use a review procedure to inform the contracting authority or contracting entity of that intention, it is necessary to make it clear that this should not affect the standstill period or any other period to apply for review. Furthermore, when a Member State requires that the person concerned has first sought a review with the contracting authority or contracting entity, it is necessary that this person should have a reasonable minimum period within which to refer to the competent review body before the conclusion of the contract, in the event that that person should wish to challenge the reply or lack of reply from the contracting authority or contracting entity.
(12) Seeking review shortly before the end of the minimum standstill period should not have the effect of depriving the body responsible for review procedures of the minimum time needed to act, in particular to extend the standstill period for the conclusion of the contract. It is thus necessary to provide for an independent minimum standstill period that should not end before the review body has taken a decision on the application. This should not prevent the review body from making a prior assessment of whether the review as such is admissible. Member States may provide that this period shall end either when the review body has taken a decision on the application for interim measures, including on a further suspension of the conclusion of the contract, or when the review body has taken a decision on the merits of the case, in particular on the application for the setting aside of an unlawful decision.
(13) In order to combat the illegal direct award of contracts, which the Court of Justice has called the most serious breach of Community law in the field of public procurement on the part of a contracting authority or contracting entity, there should be provision for effective, proportionate and dissuasive sanctions. Therefore a contract resulting from an illegal direct award should in principle be considered ineffective. The ineffectiveness should not be automatic but should be ascertained by or should be the result of a decision of an independent review body.
(14)
(15) Possible justifications for a direct award within the meaning of this Directive may include the exemptions in Articles 10 to 18 of Directive 2004/18/EC, the application of Article 31, Article 61 or Article 68 of Directive 2004/18/EC, the award of a service contract in accordance with Article 21 of Directive 2004/18/EC or a lawful ‘in-house’ contract award following the interpretation of the Court of Justice.
(16) The same applies to contracts which meet the conditions for an exclusion or special arrangements in accordance with Article 5(2), Articles 18 to 26, Articles 29 and 30 or Article 62 of Directive 2004/17/EC, to cases involving the application of Article 40(3) of Directive 2004/17/EC or to the award of a service contract in accordance with Article 32 of Directive 2004/17/EC.
(17) A review procedure should be available at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement.
(18) In order to prevent serious infringements of the standstill obligation and automatic suspension, which are prerequisites for effective review, effective sanctions should apply. Contracts that are concluded in breach of the standstill period or automatic suspension should therefore be considered ineffective in principle if they are combined with infringements of Directive 2004/18/EC or Directive 2004/17/EC to the extent that those infringements have affected the chances of the tenderer applying for review to obtain the contract.
(19) In the case of other infringements of formal requirements, Member States might consider the principle of ineffectiveness to be inappropriate. In those cases Member States should have the flexibility to provide for alternative penalties. Alternative penalties should be limited to the imposition of fines to be paid to a body independent of the contracting authority or entity or to a shortening of the duration of the contract. It is for Member States to determine the details of alternative penalties and the rules of their application.
(20) This Directive should not exclude the application of stricter sanctions in accordance with national law.
(21) The objective to be achieved where Member States lay down the rules which ensure that a contract shall be considered ineffective is that the rights and obligations of the parties under the contract should cease to be enforced and performed. The consequences resulting from a contract being considered ineffective should be determined by national law. National law may therefore, for example, provide for the retroactive cancellation of all contractual obligations ( ex tunc ) or conversely limit the scope of the cancellation to those obligations which would still have to be performed ( ex nunc ). This should not lead to the absence of forceful penalties if the obligations deriving from a contract have already been fulfilled either entirely or almost entirely. In such cases Member States should provide for alternative penalties as well, taking into account the extent to which a contract remains in force in accordance with national law. Similarly, the consequences concerning the possible recovery of any sums which may have been paid, as well as all other forms of possible restitution, including restitution in value where restitution in kind is not possible, are to be determined by national law.
(22) However, in order to ensure the proportionality of the sanctions applied, Member States may grant the body responsible for review procedures the possibility of not jeopardising the contract or of recognising some or all of its temporal effects, when the exceptional circumstances of the case concerned require certain overriding reasons relating to a general interest to be respected. In those cases alternative penalties should be applied instead. The review body independent of the contracting authority or contracting entity should examine all relevant aspects in order to establish whether overriding reasons relating to a general interest require that the effects of the contract should be maintained.
(23) In exceptional cases the use of the negotiated procedure without publication of a contract notice within the meaning of Article 31 of Directive 2004/18/EC or Article 40(3) of Directive 2004/17/EC is permitted immediately after the cancellation of the contract. If in those cases, for technical or other compelling reasons, the remaining contractual obligations can, at that stage, only be performed by the economic operator which has been awarded the contract, the application of overriding reasons might be justified.
(24) Economic interests in the effectiveness of a contract may only be considered as overriding reasons if in exceptional circumstances ineffectiveness would lead to disproportionate consequences. However, economic interests directly linked to the contract concerned should not constitute overriding reasons.
(25) Furthermore, the need to ensure over time the legal certainty of decisions taken by contracting authorities and contracting entities requires the establishment of a reasonable minimum period of limitation on reviews seeking to establish that the contract is ineffective.
(26)
(27) As this Directive strengthens national review procedures, especially in cases of an illegal direct award, economic operators should be encouraged to make use of these new mechanisms. For reasons of legal certainty the enforceability of the ineffectiveness of a contract is limited to a certain period. The effectiveness of these time limits should be respected.
(28) Strengthening the effectiveness of national review procedures should encourage those concerned to make greater use of the possibilities for review by way of interlocutory procedure before the conclusion of a contract. In those circumstances, the corrective mechanism should be refocused on serious infringements of Community law on public procurement.
(29) The voluntary attestation system provided for by Directive 92/13/EEC, whereby contracting entities have the possibility of having the conformity of their award procedures established through periodic examinations, has been virtually unused. It cannot thus achieve its objective of preventing a significant number of infringements of Community law on public procurement. On the other hand, the requirement imposed on Member States by Directive 92/13/EEC to ensure the permanent availability of bodies accredited for this purpose can represent an administrative maintenance cost which is no longer justified in the light of the lack of real demand by contracting entities. For these reasons, the attestation system should be abolished.
(30) Similarly, the conciliation mechanism provided for by Directive 92/13/EEC has not elicited any real interest from economic operators. This is due both to the fact that it does not of itself make it possible to obtain binding interim measures likely to prevent in time the illegal conclusion of a contract, and also to its nature, which is not readily compatible with observance of the particularly short deadlines applicable to reviews seeking interim measures and the setting aside of decisions taken unlawfully. In addition, the potential effectiveness of the conciliation mechanism has been weakened further by the difficulties encountered in establishing a complete and sufficiently wide list of independent conciliators in each Member State, available at any time and capable of dealing with conciliation requests at very short notice. For these reasons, the conciliation mechanism should be abolished.
(31) The Commission should be entitled to request Member States to provide it with information on the operation of national review procedures proportionate to the objective pursued by involving the Advisory Committee for Public Contracts in determining the extent and nature of such information. Indeed, only by making such information available will it be possible to assess correctly the effects of the changes introduced by this Directive at the end of a significant period of implementation.
(32) The Commission should review progress made in the Member States and report to the European Parliament and to the Council on the effectiveness of this Directive no later than three years after its deadline for implementation.
(33) The measures necessary for the implementation of Directives 89/665/EEC and 92/13/EEC should be adopted in accordance with Council Decision 1999/468/EC of 28 June 1999 laying down the procedures for the exercise of implementing powers conferred on the Commission 8 .
(34) Since, for the reasons stated above, the objective of this Directive, namely improving the effectiveness of review procedures concerning the award of contracts falling within the scope of Directives 2004/18/EC and 2004/17/EC, cannot be sufficiently achieved by the Member States and can therefore be better achieved at Community level, the Community may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty. In accordance with the principle of proportionality, as set out in that Article, this Directive does not go beyond what is necessary in order to achieve that objective, while respecting the principle of the procedural autonomy of the Member States.
(35) In accordance with point 34 of the Interinstitutional Agreement on better law-making 9 , Member States should draw up, for themselves and in the interests of the Community, their own tables illustrating the correlation between this Directive and the transposition measures, and make them public.
(36) This Directive respects fundamental rights and observes the principles recognised in particular by the Charter of Fundamental Rights of the European Union. In particular, this Directive seeks to ensure full respect for the right to an effective remedy and to a fair hearing, in accordance with the first and second subparagraphs of Article 47 of the Charter.
(37) Directives 89/665/EEC and 92/13/EEC should therefore be amended accordingly,
HAVE ADOPTED THIS DIRECTIVE:
Amendments to Directive 89/665/EEC
Directive 89/665/EEC is hereby amended as follows:
| 1. | Articles 1 and 2 shall be replaced by the following: ‘Article 1 Scope and availability of review procedures 1. This Directive applies to contracts referred to in Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts , unless such contracts are excluded in accordance with Articles 10 to 18 of that Directive. Contracts within the meaning of this Directive include public contracts, framework agreements, public works concessions and dynamic purchasing systems. Member States shall take the measures necessary to ensure that, as regards contracts falling within the scope of Directive 2004/18/EC, decisions taken by the contracting authorities may be reviewed effectively and, in particular, as rapidly as possible in accordance with the conditions set out in Articles 2 to 2f of this Directive, on the grounds that such decisions have infringed Community law in the field of public procurement or national rules transposing that law. 2. Member States shall ensure that there is no discrimination between undertakings claiming harm in the context of a procedure for the award of a contract as a result of the distinction made by this Directive between national rules implementing Community law and other national rules. 3. Member States shall ensure that the review procedures are available, under detailed rules which the Member States may establish, at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement. 4. Member States may require that the person wishing to use a review procedure has notified the contracting authority of the alleged infringement and of his intention to seek review, provided that this does not affect the standstill period in accordance with Article 2a(2) or any other time limits for applying for review in accordance with Article 2c. 5. Member States may require that the person concerned first seek review with the contracting authority. In that case, Member States shall ensure that the submission of such an application for review results in immediate suspension of the possibility to conclude the contract. Member States shall decide on the appropriate means of communication, including fax or electronic means, to be used for the application for review provided for in the first subparagraph. The suspension referred to in the first subparagraph shall not end before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contracting authority has sent a reply if fax or electronic means are used, or, if other means of communication are used, before the expiry of either at least 15 calendar days with effect from the day following the date on which the contracting authority has sent a reply, or at least 10 calendar days with effect from the day following the date of the receipt of a reply. Article 2 Requirements for review procedures 1. Member States shall ensure that the measures taken concerning the review procedures specified in Article 1 include provision for powers to: (a) take, at the earliest opportunity and by way of interlocutory procedures, interim measures with the aim of correcting the alleged infringement or preventing further damage to the interests concerned, including measures to suspend or to ensure the suspension of the procedure for the award of a public contract or the implementation of any decision taken by the contracting authority; (b) either set aside or ensure the setting aside of decisions taken unlawfully, including the removal of discriminatory technical, economic or financial specifications in the invitation to tender, the contract documents or in any other document relating to the contract award procedure; (c) award damages to persons harmed by an infringement. 2. The powers specified in paragraph 1 and Articles 2d and 2e may be conferred on separate bodies responsible for different aspects of the review procedure. 3. When a body of first instance, which is independent of the contracting authority, reviews a contract award decision, Member States shall ensure that the contracting authority cannot conclude the contract before the review body has made a decision on the application either for interim measures or for review. The suspension shall end no earlier than the expiry of the standstill period referred to in Article 2a(2) and Article 2d(4) and (5). 4. Except where provided for in paragraph 3 and Article 1(5), review procedures need not necessarily have an automatic suspensive effect on the contract award procedures to which they relate. 5. Member States may provide that the body responsible for review procedures may take into account the probable consequences of interim measures for all interests likely to be harmed, as well as the public interest, and may decide not to grant such measures when their negative consequences could exceed their benefits. A decision not to grant interim measures shall not prejudice any other claim of the person seeking such measures. 6. Member States may provide that where damages are claimed on the grounds that a decision was taken unlawfully, the contested decision must first be set aside by a body having the necessary powers. 7. Except where provided for in Articles 2d to 2f, the effects of the exercise of the powers referred to in paragraph 1 of this Article on a contract concluded subsequent to its award shall be determined by national law. Furthermore, except where a decision must be set aside prior to the award of damages, a Member State may provide that, after the conclusion of a contract in accordance with Article 1(5), paragraph 3 of this Article or Articles 2a to 2f, the powers of the body responsible for review procedures shall be limited to awarding damages to any person harmed by an infringement. 8. Member States shall ensure that decisions taken by bodies responsible for review procedures can be effectively enforced. 9. Where bodies responsible for review procedures are not judicial in character, written reasons for their decisions shall always be given. Furthermore, in such a case, provision must be made to guarantee procedures whereby any allegedly illegal measure taken by the review body or any alleged defect in the exercise of the powers conferred on it can be the subject of judicial review or review by another body which is a court or tribunal within the meaning of Article 234 of the Treaty and independent of both the contracting authority and the review body. The members of such an independent body shall be appointed and leave office under the same conditions as members of the judiciary as regards the authority responsible for their appointment, their period of office, and their removal. At least the President of this independent body shall have the same legal and professional qualifications as members of the judiciary. The independent body shall take its decisions following a procedure in which both sides are heard, and these decisions shall, by means determined by each Member State, be legally binding. OJ L 134, 30.4.2004, p. 114 . Directive as last amended by Council Directive 2006/97/EC ( OJ L 363, 20.12.2006, p. 107 ).’;" | (a) | take, at the earliest opportunity and by way of interlocutory procedures, interim measures with the aim of correcting the alleged infringement or preventing further damage to the interests concerned, including measures to suspend or to ensure the suspension of the procedure for the award of a public contract or the implementation of any decision taken by the contracting authority; | (b) | either set aside or ensure the setting aside of decisions taken unlawfully, including the removal of discriminatory technical, economic or financial specifications in the invitation to tender, the contract documents or in any other document relating to the contract award procedure; | (c) | award damages to persons harmed by an infringement. |
|---|---|---|---|---|---|---|---|
| (a) | take, at the earliest opportunity and by way of interlocutory procedures, interim measures with the aim of correcting the alleged infringement or preventing further damage to the interests concerned, including measures to suspend or to ensure the suspension of the procedure for the award of a public contract or the implementation of any decision taken by the contracting authority; | ||||||
| (b) | either set aside or ensure the setting aside of decisions taken unlawfully, including the removal of discriminatory technical, economic or financial specifications in the invitation to tender, the contract documents or in any other document relating to the contract award procedure; | ||||||
| (c) | award damages to persons harmed by an infringement. |
| 3. | Article 3 shall be replaced by the following: ‘Article 3 Corrective mechanism 1. The Commission may invoke the procedure provided for in paragraphs 2 to 5 when, prior to a contract being concluded, it considers that a serious infringement of Community law in the field of public procurement has been committed during a contract award procedure falling within the scope of Directive 2004/18/EC. 2. The Commission shall notify the Member State concerned of the reasons which have led it to conclude that a serious infringement has been committed and request its correction by appropriate means. 3. Within 21 calendar days of receipt of the notification referred to in paragraph 2, the Member State concerned shall communicate to the Commission: (a) its confirmation that the infringement has been corrected; (b) a reasoned submission as to why no correction has been made; or (c) a notice to the effect that the contract award procedure has been suspended either by the contracting authority on its own initiative or on the basis of the powers specified in Article 2(1)(a). 4. A reasoned submission communicated pursuant to paragraph 3(b) may rely among other matters on the fact that the alleged infringement is already the subject of judicial or other review proceedings or of a review as referred to in Article 2(9). In such a case, the Member State shall inform the Commission of the result of those proceedings as soon as it becomes known. 5. Where notice has been given that a contract award procedure has been suspended in accordance with paragraph 3(c), the Member State shall notify the Commission when the suspension is lifted or another contract procedure relating in whole or in part to the same subject matter is begun. That notification shall confirm that the alleged infringement has been corrected or include a reasoned submission as to why no correction has been made.’; | (a) | its confirmation that the infringement has been corrected; | (b) | a reasoned submission as to why no correction has been made; or | (c) | a notice to the effect that the contract award procedure has been suspended either by the contracting authority on its own initiative or on the basis of the powers specified in Article 2(1)(a). |
|---|---|---|---|---|---|---|---|
| (a) | its confirmation that the infringement has been corrected; | ||||||
| (b) | a reasoned submission as to why no correction has been made; or | ||||||
| (c) | a notice to the effect that the contract award procedure has been suspended either by the contracting authority on its own initiative or on the basis of the powers specified in Article 2(1)(a). |
5. Article 4 shall be replaced by the following: ‘Article 4 Implementation 1. The Commission may request the Member States, in consultation with the Committee, to provide it with information on the operation of national review procedures. 2. Member States shall communicate to the Commission on an annual basis the text of all decisions, together with the reasons therefor, taken by their review bodies in accordance with Article 2d(3).’;
6. the following article shall be inserted: ‘Article 4a Review No later than 20 December 2012, the Commission shall review the implementation of this Directive and report to the European Parliament and to the Council on its effectiveness, and in particular on the effectiveness of the alternative penalties and time limits.’.
Amendments to Directive 92/13/EEC
Directive 92/13/EEC is hereby amended as follows:
1. Article 1 shall be replaced by the following: ‘Article 1 Scope and availability of review procedures 1. This Directive applies to contracts referred to in Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors , unless such contracts are excluded in accordance with Article 5(2), Articles 18 to 26, Articles 29 and 30 or Article 62 of that Directive. Contracts within the meaning of this Directive include supply, works and service contracts, framework agreements and dynamic purchasing systems. Member States shall take the measures necessary to ensure that, as regards contracts falling within the scope of Directive 2004/17/EC, decisions taken by contracting entities may be reviewed effectively and, in particular, as rapidly as possible in accordance with the conditions set out in Articles 2 to 2f of this Directive, on the grounds that such decisions have infringed Community law in the field of procurement or national rules transposing that law. 2. Member States shall ensure that there is no discrimination between undertakings likely to make a claim in respect of harm in the context of a procedure for the award of a contract as a result of the distinction made by this Directive between national rules implementing Community law and other national rules. 3. Member States shall ensure that the review procedures are available, under detailed rules which the Member States may establish, at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement. 4. Member States may require that the person wishing to use a review procedure has notified the contracting entity of the alleged infringement and of his intention to seek review, provided that this does not affect the standstill period in accordance with Article 2a(2) or any other time limits for applying for review in accordance with Article 2c. 5. Member States may require that the person concerned first seek review with the contracting entity. In that case, Member States shall ensure that the submission of such an application for review results in immediate suspension of the possibility to conclude the contract. Member States shall decide on the appropriate means of communication, including fax or electronic means, to be used for the application for review provided for in the first subparagraph. The suspension referred to in the first subparagraph shall not end before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contracting entity has sent a reply if fax or electronic means are used, or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which the contracting entity has sent a reply or at least 10 calendar days with effect from the day following the date of the receipt of a reply. OJ L 134, 30.4.2004, p. 1 . Directive as last amended by Council Directive 2006/97/EC ( OJ L 363, 20.12.2006, p. 107 ).’;"
| 2. | (a): the title ‘Requirements for review procedures’ shall be inserted; | (a) | the title ‘Requirements for review procedures’ shall be inserted; | (b) | paragraphs 2 to 4 shall be replaced by the following: ‘2. The powers specified in paragraph 1 and Articles 2d and 2e may be conferred on separate bodies responsible for different aspects of the review procedure. 3. When a body of first instance, which is independent of the contracting entity, reviews a contract award decision, Member States shall ensure that the contracting entity cannot conclude the contract before the review body has made a decision on the application either for interim measures or for review. The suspension shall end no earlier than the expiry of the standstill period referred to in Article 2a(2) and Article 2d(4) and (5). 3a. Except where provided for in paragraph 3 and Article 1(5), review procedures need not necessarily have an automatic suspensive effect on the contract award procedures to which they relate. 4. Member States may provide that the body responsible for review procedures may take into account the probable consequences of interim measures for all interests likely to be harmed, as well as the public interest, and may decide not to grant such measures when their negative consequences could exceed their benefits. A decision not to grant interim measures shall not prejudice any other claim of the person seeking such measures.’; | (c) | paragraph 6 shall be replaced by the following: ‘6. Except where provided for in Articles 2d to 2f, the effects of the exercise of the powers referred to in paragraph 1 of this Article on a contract concluded subsequent to its award shall be determined by national law. Furthermore, except where a decision must be set aside prior to the award of damages, a Member State may provide that, after the conclusion of a contract in accordance with Article 1(5), paragraph 3 of this Article or Articles 2a to 2f, the powers of the body responsible for review procedures shall be limited to awarding damages to any person harmed by an infringement.’; | (d) | in the first subparagraph of paragraph 9, the words ‘court or tribunal within the meaning of Article 177 of the Treaty’ shall be replaced by the words ‘court or tribunal within the meaning of Article 234 of the Treaty’; |
|---|---|---|---|---|---|---|---|---|---|
| (a) | the title ‘Requirements for review procedures’ shall be inserted; | ||||||||
| (b) | paragraphs 2 to 4 shall be replaced by the following: ‘2. The powers specified in paragraph 1 and Articles 2d and 2e may be conferred on separate bodies responsible for different aspects of the review procedure. 3. When a body of first instance, which is independent of the contracting entity, reviews a contract award decision, Member States shall ensure that the contracting entity cannot conclude the contract before the review body has made a decision on the application either for interim measures or for review. The suspension shall end no earlier than the expiry of the standstill period referred to in Article 2a(2) and Article 2d(4) and (5). 3a. Except where provided for in paragraph 3 and Article 1(5), review procedures need not necessarily have an automatic suspensive effect on the contract award procedures to which they relate. 4. Member States may provide that the body responsible for review procedures may take into account the probable consequences of interim measures for all interests likely to be harmed, as well as the public interest, and may decide not to grant such measures when their negative consequences could exceed their benefits. A decision not to grant interim measures shall not prejudice any other claim of the person seeking such measures.’; | ||||||||
| (c) | paragraph 6 shall be replaced by the following: ‘6. Except where provided for in Articles 2d to 2f, the effects of the exercise of the powers referred to in paragraph 1 of this Article on a contract concluded subsequent to its award shall be determined by national law. Furthermore, except where a decision must be set aside prior to the award of damages, a Member State may provide that, after the conclusion of a contract in accordance with Article 1(5), paragraph 3 of this Article or Articles 2a to 2f, the powers of the body responsible for review procedures shall be limited to awarding damages to any person harmed by an infringement.’; | ||||||||
| (d) | in the first subparagraph of paragraph 9, the words ‘court or tribunal within the meaning of Article 177 of the Treaty’ shall be replaced by the words ‘court or tribunal within the meaning of Article 234 of the Treaty’; |
| 5. | Article 8 shall be replaced by the following: ‘Article 8 Corrective mechanism 1. The Commission may invoke the procedure provided for in paragraphs 2 to 5 when, prior to a contract being concluded, it considers that a serious infringement of Community law in the field of procurement has been committed during a contract award procedure falling within the scope of Directive 2004/17/EC, or in relation to Article 27(a) of that Directive in the case of contracting entities to which that provision applies. 2. The Commission shall notify the Member State concerned of the reasons which have led it to conclude that a serious infringement has been committed and request its correction by appropriate means. 3. Within 21 calendar days of receipt of the notification referred to in paragraph 2, the Member State concerned shall communicate to the Commission: (a) its confirmation that the infringement has been corrected; (b) a reasoned submission as to why no correction has been made; or (c) a notice to the effect that the contract award procedure has been suspended either by the contracting entity on its own initiative or on the basis of the powers specified in Article 2(1)(a). 4. A reasoned submission communicated pursuant to paragraph 3(b) may rely among other matters on the fact that the alleged infringement is already the subject of judicial review proceedings or of a review as referred to in Article 2(9). In such a case, the Member State shall inform the Commission of the result of those proceedings as soon as it becomes known. 5. Where notice has been given that a contract award procedure has been suspended in accordance with paragraph 3(c), the Member State concerned shall notify the Commission when the suspension is lifted or another contract procedure relating in whole or in part to the same subject matter is begun. That new notification shall confirm that the alleged infringement has been corrected or include a reasoned submission as to why no correction has been made.’; | (a) | its confirmation that the infringement has been corrected; | (b) | a reasoned submission as to why no correction has been made; or | (c) | a notice to the effect that the contract award procedure has been suspended either by the contracting entity on its own initiative or on the basis of the powers specified in Article 2(1)(a). |
|---|---|---|---|---|---|---|---|
| (a) | its confirmation that the infringement has been corrected; | ||||||
| (b) | a reasoned submission as to why no correction has been made; or | ||||||
| (c) | a notice to the effect that the contract award procedure has been suspended either by the contracting entity on its own initiative or on the basis of the powers specified in Article 2(1)(a). |
6. Articles 9 to 12 shall be replaced by the following: ‘Article 12 Implementation 1. The Commission may request the Member States, in consultation with the Committee, to provide it with information on the operation of national review procedures. 2. Member States shall communicate to the Commission on an annual basis the text of all decisions, together with the reasons therefor, taken by their review bodies in accordance with Article 2d(3). Article 12a Review No later than 20 December 2012, the Commission shall review the implementation of this Directive and report to the European Parliament and to the Council on its effectiveness, and in particular on the effectiveness of the alternative penalties and time limits.’;
7. the Annex shall be deleted.
Transposition
1. Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by 20 December 2009. They shall forthwith communicate to the Commission the text of those provisions. When Member States adopt those measures, they shall contain a reference to this Directive or shall be accompanied by such reference on the occasion of their official publication. The Member States shall determine how such reference is to be made.
2. Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.
Entry into force
This Directive shall enter into force on the 20th day following its publication in the Official Journal of the European Union .
Addressees
This Directive is addressed to the Member States.
Done at Strasbourg, 11 December 2007. For the European Parliament The President H.-G. PÖTTERING For the Council The President M. LOBO ANTUNES
2 OJ C 146, 30.6.2007, p. 69 .
3 Opinion of the European Parliament of 21 June 2007 (not yet published in the Official Journal) and Council Decision of 15 November 2007.
4 OJ L 395, 30.12.1989, p. 33 . Directive as amended by Directive 92/50/EEC ( OJ L 209, 24.7.1992, p. 1 ).
5 OJ L 76, 23.3.1992, p. 14 . Directive as last amended by Directive 2006/97/EC ( OJ L 363, 20.12.2006, p. 107 ).
6 OJ L 134, 30.4.2004, p. 114 . Directive as last amended by Directive 2006/97/EC.
7 OJ L 134, 30.4.2004, p. 1 . Directive as last amended by Directive 2006/97/EC.
8 OJ L 184, 17.7.1999, p. 23 . Decision as amended by Decision 2006/512/EC ( OJ L 200, 22.7.2006, p. 11 ).
9 OJ C 321, 31.12.2003, p. 1 .
{
"legislation": {
"id": "32007l0066",
"hash": "4818523efa78a218cd129e2520ddecafd89ce79673a7cc851c7a7ecf99b6481e",
"celex": "32007L0066",
"source": "eu-legislation",
"citation": null,
"languages": [
{
"title": "Directive 2007/66/CE du Parlement européen et du Conseil du 11 décembre 2007 modifiant les directives 89/665/CEE et 92/13/CEE du Conseil en ce qui concerne l’amélioration de l’efficacité des procédures de recours en matière de passation des marchés publics (Texte présentant de l'intérêt pour l'EEE )",
"summary": null,
"language": "fr",
"contentUrl": "http://publications.europa.eu/resource/cellar/c3c9c373-0f2f-41ff-8ee8-924dd53658c6.0010.03/DOC_1"
},
{
"title": "Directive 2007/66/EC of the European Parliament and of the Council of 11 December 2007 amending Council Directives 89/665/EEC and 92/13/EEC with regard to improving the effectiveness of review procedures concerning the award of public contracts (Text with EEA relevance )",
"summary": null,
"language": "en",
"contentUrl": "http://publications.europa.eu/resource/cellar/c3c9c373-0f2f-41ff-8ee8-924dd53658c6.0006.03/DOC_1"
},
{
"title": "Direttiva 2007/66/CE del Parlamento europeo e del Consiglio, dell’ 11 dicembre 2007 , che modifica le direttive 89/665/CEE e 92/13/CEE del Consiglio per quanto riguarda il miglioramento dell’efficacia delle procedure di ricorso in materia d’aggiudicazione degli appalti pubblici (Testo rilevante ai fini del SEE )",
"summary": null,
"language": "it",
"contentUrl": "http://publications.europa.eu/resource/cellar/c3c9c373-0f2f-41ff-8ee8-924dd53658c6.0012.03/DOC_1"
},
{
"title": "Richtlinie 2007/66/EG des Europäischen Parlaments und des Rates vom 11. Dezember 2007 zur Änderung der Richtlinien 89/665/EWG und 92/13/EWG des Rates im Hinblick auf die Verbesserung der Wirksamkeit der Nachprüfungsverfahren bezüglich der Vergabe öffentlicher Aufträge (Text von Bedeutung für den EWR )",
"summary": null,
"language": "de",
"contentUrl": "http://publications.europa.eu/resource/cellar/c3c9c373-0f2f-41ff-8ee8-924dd53658c6.0004.03/DOC_1"
}
],
"scrapedAt": "2026-06-17T09:47:26.813Z",
"sourceUrl": "https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32007L0066",
"adoptionDate": "2007-12-11",
"effectiveDate": "2008-01-09",
"expirationDate": "9999-12-31",
"lastAmendmentDate": null
},
"content": {
"celex": "32007L0066",
"contentUrl": "http://publications.europa.eu/resource/cellar/c3c9c373-0f2f-41ff-8ee8-924dd53658c6.0006.03/DOC_1",
"ojCitation": null
}
}