HQ 112444: Vessel Repair; Application for relief; M/V PRESIDENT LINCOLN, Voyage 87; Entry No. C27-0061057-2; Modifications; Inspection; Staging; Cleaning; Survey; Air Scavenger Space; Maintenance; Timeliness; 19 CFR 4.14(d); 19 U.S.C. 1466

us-cbp-cross-rulings-hq-112444HQ 112444: Vessel Repair; Application for relief; M/V PRESIDENT LINCOLN, Voyage 87; Entry No. C27-0061057-2; Modifications; Inspection; Staging; Cleaning; Survey; Air Scavenger Space; Maintenance; Timeliness; 19 CFR 4.14(d); 19 U.S.C. 1466Guidance

Native CBP ruling rendition. Applicability is fact-specific; modification/revocation relationships and original publisher date are retained. Publisher sentinel year0001 means unknown date, not a historical legal adoption.




                            HQ 112444

                           May 22, 1996

VES-13-18-RR:IT:EC 112444 BEW/PH

CATEGORY:   Carriers

Chief, Liquidation Section
U. S. Customs Service
P. O. Box 2450
San Francisco, California 94126 

RE:  Vessel Repair; Application for relief; M/V PRESIDENT
     LINCOLN, Voyage 87; Entry No. C27-0061057-2; Modifications;
     Inspection; Staging; Cleaning; Survey; Air Scavenger Space;
     Maintenance; Timeliness; 19 CFR 4.14(d); 19 U.S.C. 1466

Dear Sir:

This letter is in response to your memorandum dated August 25,
1992, which forwarded for our review an application for relief
from duties relating to the above-referenced vessel repair entry. 
Our ruling follows.

FACTS:

The vessel PRESIDENT LINCOLN, a United States-flag vessel owned
and operated by American President Lines (APL) of Oakland,
California, arrived at the port of San Pedro, California, on
November 26, 1991.  A vessel repair entry was timely filed
(November 27, 1991, according to Customs records).  According to
the vessel repair entry and other documents in the file, the
vessel underwent certain work at the China Shipbuilding
Corporation shipyard in Kaohsiung, Taiwan.

The vessel operator requested a 30 day extension to file an
application for relief (see 19 CFR 4.14(d)) and the extension was
granted until March 27, 1992.  On February 6, 1992, the vessel
operator submitted an application for remission of duty (dated
February 15, 1992) on the cleaning of scavenger spaces.  On March
26, 1992, the vessel operator submitted an application for
remission of duty (dated the same date) on other invoice items
listed below (except item 530)).  On April 7, 1992, the vessel
operator submitted an application for remission of duty (dated
April 2, 1992), stated to "supplement" the March 26, 1992,
application, for item 530 (bow thruster space piping
modification).

In the above-referenced applications, the applicant identified
certain items as non-dutiable modification work, and claimed that
certain other items were non-dutiable as consisting of staging,
inspection, or cleaning.  You requested that we review certain
items in the entry and provide you with our determination as to
the dutiability of those items.  Those items, with descriptions
and other information from the invoice and other materials in the
file, are listed below:

The following items have been referred for our review.

     Item no.     Invoice description, etc.

     509          Bow thruster survey.  The portions of this
                  item in controversy are stated to consist of:
                  (1) erection of and removal of staging; and
                  (2) opening and closing blade hatch for
                  working.  The remaining portions in this item
                  are conceded to be dutiable.  The time,
                  material, and cost for item (1) (staging) are
                  segregated from time, material, and costs for
                  the other items, but the remaining time,
                  material, and costs are not segregated. 
                  According to ABS Survey KS 7365-A, the
                  thrusters were cleaned as necessary, examined
                  and considered satisfactory.  There is no
                  indication in the ABS Surveys that the survey
                  was performed to ascertain the extent of
                  damages.

     509.3        Bow thruster tunnel bar removal.  This item is
                  stated to consist of the removal of bow
                  thruster tunnel bars from tunnel entrances,
                  the grounding of tunnel and hull surfaces
                  flush and smooth, and the carrying out of a
                  dye check for ABS inspection.  This item is
                  not referred to in the pertinent ABS Reports
                  (KS 7365-A and KS 7365-B).

     514          Installation of lashing padeyes.  This item is
                  stated to consist of cropping D-rings and
                  installation of new solid lashing padeyes as
                  per drawing 8616512-05-30 Alt. 2 (supplied
                  with the Application).  The padeyes are stated
                  to change the container lashing system to
                  increase the allowable stack weight of on-deck
                  containers, improve operating efficiency, and
                  reduce maintenance and repair of deck/pedestal
                  fittings.  This item is referred to in ABS
                  Report KS 7365-G as "Installation of Lashing
                  Padeyes."  In item 514 and many other items in
                  the invoice, it is stated that "[d]estroied
                  area were disc-grinded or sandsweeped then
                  applied the coats as the specification."

     515          Removal and replacement of hatch covers.  This
                  item is stated to consist of the handling and
                  crane service for inspection of the hatch
                  covers.  Included in this item are the
                  arrangement of blocks for each hatch cover,
                  the provision of riggers and crane to remove
                  the hatch covers, and the welding of temporary
                  "lifting pieces" for three of the hatch
                  covers.   ABS Report KS 7365-G reports on
                  "hatch covers and hatch coamings modification
                  and repair ..."

     515.1        Hatch coamings.  The portions of this item in
                  controversy ("modification of longitudinal
                  hatch coaming at expansion joint" and
                  "longitudinal hatch coaming repaired at row
                  12, aft (P/S)") are stated to consist of the
                  modification of the hatch coaming as per
                  drawing HEC8803-4 in the first case and the
                  cropping and renewal of the longitudinal hatch
                  coaming top plate as per drawing HEC9106-3 in
                  the second case.  In the case of row 12, this
                  work is described as repair in ABS Report KS
                  7365-G (hatch covers and hatch coamings
                  modification and repair survey) (this ABS
                  report distinguishes between repairs and
                  modifications).  In the same ABS Report, we
                  could find no reference to the work at the
                  expansion joint. 

     515.2        Hatch covers.  The portions of this item in
                  controversy ((1) modification of bearing pads,
                  (2) modification of cover no. 8 (referred to
                  in the invoice as "hatch cover #8(P/S)") in
                  way of 20 foot stowage outboard, (3)
                  modification of hatch covers 2 - 9 starboard
                  of sliding base socket, (4) modification of
                  hatch covers 10 and 11, (5) modifications to
                  hatch cover bearing pads) are stated to
                  consist of modifications for which drawings
                  are supplied ((1) - drawing 9106-5, (2) -
                  drawing 9106-7, (3) - drawing 9106-6, (4) -
                  drawing 9106-2) and, in the case of (5),
                  modifications to reinforce the hatch cover
                  bearing pad with additional "stifference"
                  behind the bearing pad.  In the case of the
                  bearing pads the ABS report describing this
                  work (ABS Report KS 7365-G) states that "[a]ll
                  bearing pads were re-positioned at this time
                  on hatch cover Nos. 1 [through] 9 to take over
                  existing worn down ones".  In the case of
                  cover no. 8, this work is described in ABS
                  Report KS 7365-G as modifications (adding two
                  new girders) and there is no reference to
                  repairs.  In the case of covers 2 - 9 (sliding
                  base sockets), this work is described in ABS
                  Report KS 7365-G as modifications
                  (installation of sliding twistlock
                  foundations) and there is no reference to
                  repairs.  In the case of hatch cover 10 and
                  11, this work is described in ABS Report KS
                  7365-G as "Modifications/Repairs" (as noted
                  above, the ABS Report distinguishes between
                  modifications and repairs).  In the case of
                  the reinforcement of the hatch cover bearing
                  pads, we could find no reference in the ABS
                  Report.

     516          Tailshaft survey.  The portions of this item
                  in controversy are stated to consist of (1)
                  erection and removal of staging and various
                  inspections; and (2) removal and
                  reinstallation of the rope guard, welding and
                  cutting lifting pieces for propeller removal,
                  disconnection of the propeller, certain tests
                  and checks, force fitting the propeller,
                  cleaning certain tanks, and other work (the
                  applicant concedes that the portion of this
                  item consisting of the grinding smooth of an
                  area of pitting and/or corrosion on the
                  tailshaft is dutiable, as repairs).  There is
                  no indication in the ABS Survey (KS 7365-B)
                  that the survey was performed to ascertain the
                  extent of damages.

     519          Modification at bulkhead at frame Nos. 59 &
                  61.  Both this item and item 519.1 (below) are
                  stated to be "modification[s] ... as a
                  consequence of failures arising from a basic
                  design deficiency[;] [the initial design is
                  stated to have] lacked the fundamental
                  requirement of structural continuity ..."  In
                  regard to this item and item 519.1, there are
                  references in the ABS Survey Reports to
                  repairs which appear to relate to these items
                  (Report KS 7365-G refers to "Repairs and
                  Modifications of Longitudinal Bulkhead
                  Transition Between Fr. 60 and Transverse
                  Bulkhead at Fr. 65; Report KS 7365-D notes
                  Report KS 7365-G for the detail of "repairs"
                  for transverse watertight bulkhead at fr. 65;
                  and there are references to the "buckled
                  transverse floor in way at fr. 61" in Report
                  KS 7365). 

     519.1        Modification at bulkhead at frame Nos. 61 &
                  65.  See item 519, above.

     520          Fuel oil tank cleaning.  This item is stated
                  to include the cleaning of the tanks to be
                  safe for men and surveys (disposal of oily
                  water or dead oil, removal of sludge, and
                  supplying of chemical cleaner).  The ABS
                  Report for this item (Report KS 7365-D) refers
                  to repairs to the following tanks among the
                  tanks enumerated in this item: fuel oil wing
                  tank 3A (starboard), fuel oil wing tank 1
                  (starboard), and fuel oil wing tank 1 (port). 
                  Report KS 7365-D refers to Report KS 7365-F
                  for details of the repairs.  There is no
                  reference to fuel oil wing tank 3A in Report
                  KS 7365-F, but the report describes the
                  finding of fractures and the repair thereof in
                  regard to fuel oil tank no. 1 on the port and
                  starboard side (the frames for these tanks
                  indicate that they are the same as cited
                  above).  Time, material, and costs are not
                  segregated in this item. 

     521          Relocate aft hose crane.  This item is stated
                  to consist of cutting off and removal of
                  table, locker, and support, draining and
                  renewal of hydraulic oil, removal and
                  installation of newly made handrail, filling
                  hydraulic oil (supplied by yard), and erection
                  and removal of staging (only the last portion
                  is segregated).  The reason given for the
                  relocation is "to improve the accessibility,
                  reliability and to extend the life of the
                  equipment [as] [i]t was an initial design
                  deficiency to place such equipment in an area
                  exposed to weather and exhaust stack gasses." 
                  We could find no reference related to this
                  item in the ABS Reports in the file.

     522          Stores & hose crane.  This item is stated to
                  consist of the replacement of the rubber hoses
                  on stores and hose cranes with stainless steel
                  tubing and fittings.  We could find no
                  reference related to this item in the ABS
                  Reports in the file.

     525          Ballast tank inspection & survey.  This item
                  is stated to consist of opening up bolted
                  manhole covers for the tanks, testing oxygen
                  contents, furnishing temporary lighting and
                  ventilator for one of the tanks, and providing
                  qualified inspectors to inspect the tanks. 
                  The ABS Report for this item (Report KS 7365-D) refers to repairs to the following tanks
                  among the tanks enumerated in this item: deep
                  water ballast tanks 6B (port and starboard). 
                  Report KS 7365-D refers to Report KS 7365 for
                  details of the repairs.  The latter report
                  refers to outstanding recommendation in a
                  November 8, 1989, report for this vessel and
                  describes the permanent "repairs" made to the
                  vessel "at this time."  Time, material, and
                  costs are not segregated in this item. 

     525.1        Ballast tank inspection.  The portions of this
                  item in controversy ((1), (2), and (3)) are
                  stated to consist of cleaning out, (disposing
                  of oily water, removal of sludge, and
                  supplying chemical cleaner, and other cleaning
                  operations) as well as replacement of broken
                  and missing cover studs and bolts (No. 6A D.B.
                  tank starboard) and replacement of new
                  grommets (66 pieces supplied by the yard). 
                  The ABS Report for this item (Report KS 7365-D) refers to repairs to deep upper fuel oil
                  tank No. 2 (port) among the tanks enumerated
                  in this item.  Report KS 7365-D refers to
                  Report KS 7365-F for details of the repairs. 
                  The latter report states that the tank top
                  plating for that tank "was found holed and
                  heavily wasted and was partly cropped and
                  renewed ...".  Time, material, and costs are
                  not segregated in this item. 

     530          Bow thruster space piping.  This item is
                  stated to consist of rerouting bilge piping. 
                  We could find no reference related to this
                  item in the ABS Reports.

     531          Anchor chain & chain locker.  The portions of
                  this item in controversy ((1) and (3)) are
                  stated to consist of (portion (1)) ranging out
                  anchor chains for examination, washing down
                  chain to removal scale and foreign materials
                  to allow for examination, calibration of
                  chains, restowing chains, and arranging crane
                  to chains; and (portion (3)) opening manhole
                  cover of chain lockers, cleaning chain
                  lockers, mud removal, and closing manhole
                  cover with new gaskets.  The applicant
                  concedes that portion (2) of this item is
                  dutiable.  ABS Reports KS 7365-A and KS 7365-D
                  pertain to this item.  There is no indication
                  in the Reports that the survey was performed
                  to ascertain the extent of damages.

     532          Main engine sump survey.  This item is stated
                  to consist of opening manhole covers, cleaning
                  and drying all engine parts and sump interior
                  (removal and disposal of dead oil, removal of
                  sludge, supplying chemical cleaner) and
                  closing manhole covers after survey.  The
                  foregoing is consistent with the ABS Report
                  pertaining to this item (Report KS 7365-E). 
                  There is no indication in the Report that the
                  survey was performed to ascertain the extent
                  of damages. 

     556          Salt water piping.  This item is stated to
                  consist of gauging and recording all overboard
                  pipes and all pipes below floor plating in
                  narrow spaces and tank.  In regard to this
                  item and item 561 (below), the only reference
                  we could find related to these items in the
                  ABS reports was for the survey of "[a]ll
                  openings to the sea ..." in Report KS 7365-E. 
                  No repairs are referred to in this regard in
                  that Report.

     561          No. 1, 2, & 3 sumps.  This item is stated to
                  consist of opening and closing manhole covers,
                  cleaning (removal of sludge and supplying
                  chemical cleaner) the tank to be safe for men
                  and surveys.

     8            Cleaning air scavenger space.  This item is
                  stated to consist of opening main engine
                  scavenger space access doors for complete
                  cleaning, removal of all oily deposits and
                  waste material, and (upon completion of
                  inspection by vessel engineers), closing up of
                  all access doors.  Also included are crating,
                  packing and shipment, tool rental, fees or
                  taxes, transportation of materials and men,
                  meals of labor crews, and materials and
                  equipment (rags and PVC bags).

ISSUES:

Whether the work described in the FACTS portion of this ruling is
dutiable under the vessel repair statute (19 U.S.C. 1466).

LAW AND ANALYSIS:

Initially we note, in regard to the timeliness of the application
for relief in this matter, that the Customs Regulations governing
such applications for relief (see 19 CFR 4.14(d)(1)(ii)), issued
under 19 U.S.C. 1466, require the application for relief, with
supporting evidence, to be filed within 90 days (with authority
for an extension of 30 additional days) from the first arrival of
the vessel.  As stated above, an extension of the 90-day period
was granted until March 27, 1992.  Therefore, the application for
relief (including the February 15 and March 26, 1992, letters and
materials submitted with them) was timely.  However, since the
cited Customs Regulation requires the application for relief,
with supporting evidence, to be filed within the time period, and
since there is no provision for supplementing the application for
relief after expiration of the time period in regard to an issue
not previously raised, the April 2, 1992, letter (filed April 7,
1992) was untimely and is not being considered (see ruling HQ
111688).

Under 19 U.S.C. 1466:

     The equipments, or any part thereof ... purchased for, or
     the repair parts or materials to be used, or the expenses of
     repairs made in a foreign country upon a vessel documented
     under the laws of the United States to engage in the foreign
     or coasting trade, or a vessel intended to be employed in
     such trade, shall, on the first arrival of such vessel in
     any port of the United States, be liable to entry and the
     payment of an ad valorem duty of 50 per centum on the cost
     thereof in such foreign country.

Section 1466 also provides, generally, for remission or refund of
such duties if it is established that the purchases or repairs
were compelled by stress of weather or other casualty, that the
equipments or repairs were manufactured or produced in the United
States and the labor necessary to install them or make the
repairs was performed by United States residents or members of
the regular crew of the vessel, or that the equipments or
materials or labor were used as dunnage for cargo, or similar
purposes.  In addition, section 1466 provides for the exemption
from vessel repair duties for certain materials with respect to a
vessel which arrives in a United States port two years or more
after its last departure from a United States port, and for
certain materials for LASH (Lighter Aboard Ship) barges, or
certain spare parts or materials subject to various specified
conditions.  The Customs Regulations issued under section 1466
are found in 19 CFR 4.14.

The Customs Service has issued many rulings applying and
interpreting 19 U.S.C. 1466.  See, e.g., HQ 112851, dated March
22, 1996.  Ruling HQ 112851, includes statements of the general
rules for the determination of what are modifications to the hull
and fittings of a vessel (held not to be dutiable under section
1466), and the dutiability under section 1466 of the cost of
inspections or surveys done by the American Bureau of Shipping
(ABS).  Generally, qualifying modifications to the hull and
fittings of a vessel involve a permanent incorporation into the
hull or superstructure of a vessel, provide an improvement or
enhancement in operation or efficiency of the vessel, and may not
involve the replacement of a current part, fitting, or structure
which is not in good working order.

In regard to surveys or inspections, the general rule is that a
survey undertaken to meet the specific requirements of a
governmental entity, classification society, or insurance carrier
is not dutiable even when dutiable repairs are effected as a
result of a survey.  When an inspection or survey is conducted to
ascertain the extent of damages sustained or whether repairs are
necessary, the costs are dutiable as part of the repairs which
are accomplished.  The LAW AND ANALYSIS portion of ruling HQ
112851 is incorporated by reference into this ruling, in regard
to its description of the interpretation of these issues (i.e.,
the dutiability of modifications to the hull and fittings of a
vessel and surveys or inspections).

Insofar as cleaning operations are concerned, Customs has held
that cleaning operations which remove rust and deterioration or
worn parts, and which are a necessary factor in the effective
restoration of a vessel to its former state of preservation,
constitute vessel repairs.  Analogous to Customs position
regarding the dutiability of surveys, Customs has long held that
the cost of cleaning is not dutiable unless it is performed as
part of, in preparation for, or in conjunction with dutiable
repairs or is an integral part of the overall maintenance of the
vessel (see C.I.E.'s 18/48; 125/48; 910/59; 820/60; 51/61;
569/62; and 698/62). 

Also pertinent in this case are Customs positions regarding the
segregation of dutiable and non-dutiable costs and the
dutiability of accessing work.  Pursuant to C.I.E. 1325/58 and
C.I.E. 565/55, duties may not be remitted where the invoice does
not segregate the dutiable costs from the non-dutiable costs.   
Where accessing work is integral to dutiable repairs, the
accessing work is also dutiable (see HQ ruling 108366). 

(As for the possible applicability of the decision in Texaco
Marine Services, Inc. v. United States, 44 F. 3d 1539 (Fed. Cir.
1994), to surveys or inspections (see above), we note that,
except for post-repair cleaning and protective coverings, the
decision in that case will not apply to vessel repair entries
filed prior to the date of that decision (December 29, 1994). 
Since the vessel repair entry under consideration was filed prior
to that date, Texaco would not affect Customs position regarding
surveys in the entry under consideration.)

The applicant claims that items 509.3, 514, 515.1 (portions
only), 515.2 (portions only), 519, 519.1, 521, 522, and 530 (as
noted, the application for item 530 was untimely; no relief may
be granted in regard to this item) are non-dutiable, as
modifications to the hull and fittings of the vessel.  Item 509.3
is non-dutiable on that basis (see rulings 111881 and 111884;
contrast to ruling 112864, in which the same work by the same
shipyard on the same class of vessel was held dutiable because
the work included a welding build-up of corroded areas, as
described in an invoice from the same shipyard as is involved in
this case).  Item 514 is non-dutiable on the same basis (see
rulings 112454 (invoice from same shipyard as in this case
relating to the same work on the same class of vessel) and
112851) (in the case of the work in this item and other items
described as "[d]estroied area were disc-grinded or sandsweeped
then applied the coats as the specification", we assume that this
work consists of restoring the area where the modifications were
made to its original condition so that it is not dutiable as
repairs (see C.I.E. 1043/60, see also, e.g., rulings 112851 and
112454)).  The portion of item 515.1 consisting of work on the
"longitudinal hatch coaming at expansion joint" is non-dutiable
as a modification (see ruling 112454 in which the same work on
the same class of vessel, described in an invoice from the same
shipyard as is involved in this case, was held non-dutiable). 
The portion of item 515.1 consisting of "longitudinal hatch
coaming repaired at row 12 ..." is dutiable as a repair (as
described in the invoice and ABS Report KS 7365-G).

The portions of item 515.2 under consideration are dutiable or
non-dutiable as follows.  The portion of item 515.2 consisting of
modification of bearing pads is dutiable (note that ABS Report
KS-7365-G describes the existing pads as "worn down" (see
discussion of modifications in ruling HQ 112851 - qualifying
modifications may not involve the replacement of a current part,
fitting, or structure which is not in good working order).  The
portions of item 515.2 consisting of work on (1) cover no. 8; and
(2) sliding base sockets are nondutiable as modifications (see
ruling HQ 112454 in which similar work on the same class of
vessel by the same shipyard as is involved in this case was held
non-dutiable (note also that the same drawing of the modification
(No. HEC9106-6 is referred to in both case and that the
applicable ABS Report describes the work as modifications)).  The
portion of item 515.2 consisting of work on hatch covers 10 and
11 is dutiable, on the basis of the description of the work as
"Modifications/Repairs" in ABS Report KS 7365-G (note that the
ABS report distinguishes between repairs and modifications).  The
portion of item 515.2 consisting of reinforcement of the bearing
pads (with the addition of "stifference") is dutiable in the
absence of satisfactory evidence to establish that it is a non-dutiable modification (we note that it is not referred to in the
ABS Reports).

In regard to items 519 and 519.1, as noted in the FACTS portion
of this ruling about these items, references to related areas
and/or work in the referenced ABS Reports appear to indicate that
this work may have involved the modification of structures of the
hull and fittings which were not in good working order.  We note
that in ruling HQ 112864 we held similar work to be non-dutiable,
as modifications, on the basis of communication between the
vessel operator and the ABS and the U.S. Coast Guard (the
communication referred to the vessel involved in that case as
well as the M/V PRESIDENT LINCOLN).  However, on the basis of the
above-described evidence indicating that this work may have
involved the modification of structures not in good working
order, we must hold this work to be dutiable.

Item 521, consisting of the relocation of the aft hose crane, and
item 522, consisting of the replacement of rubber hoses on stores
and hose cranes with stainless steel tubings and fittings, are
non-dutiable (see ruling HQ 112864; note that the work held non-dutiable in that case was the same work on the same class of
vessel in the same shipyard; note further that there is no
evidence of repairs regarding these items).

The applicant claims that items 509 (portions only), 515, 516
(portions only), 520, 525, 525.1 (portions only), 531 (portions
only), 532, and 561 are non-dutiable, as relating to surveys or
inspections.  In the case of item 509, the costs for staging are
segregated from the other costs but the costs for opening and
closing the blade hatch are not segregated from the costs
conceded by the applicant to be dutiable.  The costs for staging
are non-dutiable (see C.I.E. 1822/58).  The remaining costs are
dutiable (see the rulings cited above in this regard, C.I.E.
1325/58 and C.I.E. 565/55 (failure of an invoice to segregate
dutiable costs from non-dutiable costs) and HQ ruling 108366
(accessing work which is integral to dutiable repairs)).  Item
515 is dutiable, as involving unsegregated costs other than
transportation (see rulings HQ 112454, HQ 112864, and HQ 113085,
in which the same work by the same shipyard on the same class of
vessel was held dutiable on the same basis).

In the case of item 516, the costs for staging are segregated
from the other costs and are non-dutiable (see C.I.E. 1822/58). 
The costs for removing and reinstalling the rope guard,
disconnecting the propeller, and other work under the second
portion of this item are dutiable, as work performed, in part, in
preparation for repairs in the third portion of this item,
conceded by the applicant to be dutiable (see rulings HQ 112454,
HQ 112864, and HQ 113085, in which the same work by the same
shipyard on the same class of vessel was held dutiable on the
same basis).

Items 520, 525, and 525.1 are dutiable as including unsegregated
preparation for dutiable tank repairs (see ABS Reports describing
such repairs and referred to in the FACTS portion of this ruling)
(see rulings HQ 112454, HQ 112864, and HQ 113085, in which
similar work by the same shipyard on the same class of vessel was
held dutiable on the same basis; see also, above discussion of
cleaning and segregation of dutiable and non-dutiable work).  (In
regard to item 525.1, we note that part of the unsegregated costs
in this item were for the replacement of broken and missing cover
studs and bolts, which has been held dutiable (ruling HQ
112894).)

In item 531, the portion of that item including ranging out
anchor chains for examinations and other work is dutiable as
including preparation for repairs conceded to be dutiable by the
applicant (see rulings HQ 112454, HQ 112864, and HQ 113085, in
which the same work by the same shipyard on the same class of
vessel was held dutiable on the same basis; see also, above
discussion of cleaning and segregation of dutiable and non-dutiable work).  The portion of item 531 consisting of opening
the manhole cover of the chain lockers and related work is non-dutiable, as not done in conjunction with repair work (see
rulings HQ 112454, HQ 112864, and HQ 113085, in which the same
work by the same shipyard on the same class of vessel was held
non-dutiable on the same basis).

Items 532 and 561 are non-dutiable, as cleaning and preparation
for inspections (see ruling HQ 112454, in which similar work by
the same shipyard on the same class of vessel was held non-dutiable on the same basis; see also, above discussion of
cleaning and surveys or inspections).

In regard to item 556, we note that it is Customs position that
gauging for the purpose of ascertaining whether repairs are
required is considered an integral part of the repair work
performed and is dutiable (ruling HQ 109144).  When the result of
gauging is that all readings are satisfactory and no repairs are
connected with the gauging, the cost of gauging is non-dutiable
(see, e.g., rulings HQ 112756, HQ 112222).  In this case, the
invoice describes this item as "SALT WATER PIPING, REPAIRS ABS &
USCG INSPECTION" (emphasis added).  Since the invoice describes
the work as "repairs" (we note that the invoice describes other
gauging items without referring to repairs (see item 571)) and
since the ABS Reports in the file do not clarify this matter, we
are unable to grant relief for this item.  Item 556 is dutiable.

The dutiability of cleaning air scavenger spaces (item 8) has
been thoroughly considered by Customs (see, e.g., rulings HQ
111700 and HQ 112454).  It is Customs position that this
operation is the correction (by cleaning) of a deterioration (the
collection of carbon and oil deposits in air scavenger spaces). 
Therefore, this operation is a maintenance operation and is
dutiable.

HOLDING:

Among the items about which you requested advice, items 509
(staging), 509.3, 514, 515.1 (longitudinal hatch coaming at
expansion joint), 515.2 (cover no. 8), 515.2 (sliding base
sockets), 516 (staging), 521, 522, 531 (opening manhole cover of
chain lockers and related work), 532, and 561 are NON-DUTIABLE.  
Items 509 (portions other than staging), 515, 515.1 (longitudinal
hatch coaming repaired at row 12), 515.2 ("modification" of
bearing pads), 515.2 (hatch covers 10 and 11), 515.2
(reinforcement of bearing pads), 516 (portions other than
staging), 519, 519.1, 520, 525, 525.1, 530, 531 (ranging out
anchor chains for examinations and other work), 556, and 8
(cleaning air scavenger spaces) are DUTIABLE.

                         Sincerely,




                         William G. Rosoff                  Chief
                         Entry and Carrier Rulings Branch