100-06 Medicare Financial Management Manual: Chapter 1 - Budget Preparation - Intermediaries and Carriers

us-cms-medicare-manuals-pub-100-06-fin106c01100-06 Medicare Financial Management Manual: Chapter 1 - Budget Preparation - Intermediaries and CarriersGuidance

Medicare Financial Management
Chapter 1 - Budget Preparation - Intermediaries and
Carriers
Table of Contents
(Rev. 149, 03-27-09
Transmittals for Chapter 1
10 - General
10.1 - Budget Forms Supply
20 - The Budget Cycle
30 - Role of the Regional Offices (RO)
40 - Introduction of Activity Level Budget and Cost Reporting
50 - General CAFM II System Information
50.1 - Budget and Cost Reports
60 - List of Acronyms
70 - Exhibit of Administrative Budget and Cost Report, Activity Form
80 - Completing the Administrative Budget and Cost Report - Activity Form
90 - Explanation of Entries on the Activity Form
90.1 Title and Use
90.2 - Contractor Number
90.3 - Contractor Name
90.4 - Activity Code
90.5 - Funding FY
90.6 - Reporting FY
90.7 - Report Month
90.8 - Acceptance Date
90.9 - Cost Categories
90.10 - Allocation of Overhead and General and Administrative Costs
100 - Description of Operations
100.1 - Bills/Claims Payment Function (Summary Level Code 11000)
100.2 - Appeals Function (Summary Level Code 12000)
100.3 - Inquiries Function (Summary Level Codes 13000 and 33000)
100.4 - PM - Provider Education and Training (PET) Function (Summary Level
Code 14000)
100.5 - Provider Reimbursement Function (Summary Level Code 16000)
100.5.1 - Participating Physicians Function (Summary Code 15000)
100.6 - Productivity Investments (PI) Function (Summary Level Code 17000)
100.10 - Benefit Integrity (BI) Function (Summary Level Code 23000)
100.11 - MIP - Provider Education and Training (PET) Function (Summary Level
Code 24000)
100.12 - Audit Function (Summary Level Code 26000)
100.13 - MIP Productivity Investments Function (Summary Level Code 27000)
100.14 - MIP-Medicare Program Administration (Summary Level Code 29000)
110 - Exhibit of Special Projects Form
110.1 - Completing the Special Projects Form
120 - Exhibit of Schedule of Other Direct Costs (Schedule A)
120.1 - Completing the Schedule of Other Direct Costs (Schedule A)
130 - Exhibit of Schedule of Other Costs (Schedule B)
130.1 - Completing the Schedule of Other Costs (Schedule B)
140 - Exhibit of Schedule of Non-COB Credits (Schedule C)
140.1 - Completing the Schedule of Non-COB Credits (Schedule C)
150 - Exhibit of Schedule of Other Adjustments (Schedule D)
150.1 - Completing the Schedule of Other Adjustments (Schedule D)
160 - Exhibit of the Miscellaneous Cost Schedule
160.1 - Completing the Miscellaneous Cost Schedule
170 - Exhibit of Cost Classification Report, Form CMS-2580
180 - Completing the Cost Classification Report, Form CMS-2580
180.1 - Column A
180.2 - Column B
180.3 - Column C
180.4 - Column D
180.5 - Cost Classification Categories
180.6 - Total
180.7 - Pension Costs
180.8 - Remarks
190 - Exhibit of Certification Form
190.1 – Completing the Certification Form
200 - Exhibit of Schedule of Net Hours Available, Form CMS-3258
200.1 - Completing the Schedule of Net Hours Available
210 - Contractors Performing Services for Other Medicare Contractors
210.1 - Servicing Contractor
210.2 - Receiving Contractor
220 - Budget Justification
230 - Completing the Budget Request
230.1 - Transmittal
230.2 - Hard Copy Requirements
230.3 - Activities
230.4 - Hours
230.5 - Costs
230.6 - Workload
230.7 - Net Hours Available (Miscellaneous Section)
230.8 - Narrative and Financial Analysis Requirements
230.9 - Financial Information Survey
240 - Additional Instructions Pertaining To Supplemental Budget Requests (SBRs)
250 - The Notice of Budget Approval (NOBA) 250.1 - End of FY NOBA
250.2 - Cumulative Quarterly Distribution
250.3 - Certifying Official
270 - Budget Preparation Check List for Program Management And Medicare Integrity
Program
280 - Exhibit of Contractors Auditing and Settlement Reports Form CMS-1525A
300 - Exhibit of Audit Selection Criteria Report - Intermediaries Only
310 - Completing the Audit Selection Criteria Report (ASCR)
310.1 - Audit Selection Priorities
350 - Instructions for Using the System for Tracking Audit and Reimbursement (STAR)
370 - General
380 - Interest Rates In Calculating Debt Due To The Government
390 - Travel Costs
400 - Calculating Return on Investment Where the Contractor's Year for Insurance
Commission Filing Differs from the Medicare Contract Year 410 - Cost of Project
Exceeds Estimates
440 - Introduction to Financial Policies for Coordination of Medicare and Other
Insurance Programs
450 - Coordination of Medicare and Complementary Insurance Programs
460 - Coordination of Medicare with The Federal Grants-In-Aid Program (Medicaid)
460.1 - Furnishing Title XVIII Claims Information
460.2 - Treatment of Administrative Cost of Furnishing Information to State
Agencies
460.3 - Cost of a Separate Claims Process
460.4 - Integrated Claims Processing Systems
460.5 - Other Services
470 - Principles for Sharing Costs of Physician Profiles
470.1 - Release of Physician Profile Information to Title XIX Agencies and to
TRICARE Fiscal Intermediaries
470.2 - Principles for Sharing Costs of Physician Profiles When Used for Medicare and
the Carriers' Regular Business
480 - Coordination of Medicare and Medicare Supplemental (Medigap) Health Insurance
Policies
480.1 - Exhibits, Medigap Insurers
490 - Establishing a Common Provider Audit Program.490 - Establishing a
Common Provider Audit Program.
490.1 - Policies for Implementation of a Common Provider Audit Program for
Titles V, XVIII and XIX of the Social Security Act
490.2 - Cost Sharing
490.3 - Desk Review
490.4 - Field Audit
490.5 - Final Settlement
490.6 - Implementing a Common Audit Program
490.7 - Contacting State Agencies or Their Fiscal Agents
490.8 - Points to Remember in Discussions with Other Parties
490.9 - Release of Final Settlement Data for Periods Ending Prior to January l,
1970 to State Agencies Signing Agreements
490.10 - Release of Final Settlement Data for Periods Ending After December 31,
1969 to State Agencies Signing Agreements
490.11 - Treatment of Administrative Costs Accrued in the Operation of a
Common Audit Program
490.12 - Treatment of Receipts for Final Settlement Data Released to State
Agencies
500 - Coordination of Final Settlement Data Without A Common Audit Program
500.1 - Treatment of Administrative Costs and Receipts for Furnishing Settlement
Information Where There is No Common Audit Program
510 - Reporting Costs for Assistance Provided PROs
NOTE: Revision 1, the initial release of this chapter, includes a cross reference to the
source sections in current manuals. The manual is identified by A1, A2, A3, or A4 for
Intermediary Manual Parts 1 through 4; or by B1, B2, B3 or B4 for Carriers Manual Parts
1 through 4. This indicator is followed by a dash and the related section number.
10 - General - (Rev. 1, 08-30-02)
A1-1200, B1-4200
The Secretary is authorized to make funds available for administrative costs related to the
functions contractors perform as stipulated in the Agreement under the provisions of title
XVIII of the Social Security Act. Funds available for this purpose are in the DHHS
Appropriation Act. These funds are provided for a fiscal year (FY) beginning October 1.
They are not available for obligation and expenditure until released by the Office of
Management and Budget in an apportionment that is made on a quarterly basis to
preclude an expenditure rate that exceeds the appropriation. Medicare administrative
funds will be requested separately for program management (PM) and Medicare Integrity
Program (MIP). Contractors shall report this on CMS's activity level budget and cost
reporting system - Contractor Administrative-Budget and Financial Management System
(CAFM II).
The Anti-Deficiency Act, 31 USC 1341, provides that no government official or
employee may authorize or create an obligation, or make or cause to make an expenditure
in excess of an apportionment of appropriated funds. To enforce this prohibition, the Act
requires administrative discipline of government officials and employees who
inadvertently exceed their authority, and criminal penalties for those who do so
knowingly and willfully.
In order for the Secretary to ensure that adequate funds are available and trust funds are
efficiently used for the administration of the Federal Health Insurance Program, the
contractor shall submit an estimate of administrative costs that are anticipated for the
ensuing FY. Predicate the annual budget on the budget and performance requirements
(BPRs) issued by CMS and on its previous Medicare cost and productivity experience. It
shall consider unusual or non-recurring type activities that could be part of the historical
cost data.
The Secretary will pay contractors for necessary and proper costs of administration as
determined by the Principles of Reimbursement in Appendix B of the contract/agreement.
The amount of the settlement is subject to audit. Thus, the inclusion of funds in an
approved budget or in a subsequent cost statement does not constitute a final
determination as to the allowability of such costs. However, it is intended that a mutual
agreement on the estimate will facilitate fiscal planning by both the contractor and CMS,
and provide a basis for common understanding for determining administrative costs.
The Secretary may also enter into fixed price or other non-cost related agreements. The
instructions that follow do not pertain to non-cost related agreements, unless specifically
designated in the individual contract.
10.1 - Budget Forms Supply - (Rev. 1, 08-30-02)
A1-1200.1, B1-4200.1
Copies of all forms referred to in the ensuing sections can be obtained from the CAFM II
System.
20 - The Budget Cycle - (Rev. 1, 08-30-02)
A1-1201, B1-4201
The following annual budget calendar establishes approximate target dates for each phase
of the budget cycle to insure an orderly workflow during the planning, preparation, and
review of budgets. This calendar may be supplemented and revised in the annual BPRs
letter.
• 	The contractor shall submit workload estimates (if requested) - February/March.
• 	BPRs transmitted to contractor - May/June. (Included in the BPRs is information
relative to statement of work, level of effort, program emphases, new program
developments and specific recommendations regarding activities of individual
contractors.)
• 	Contractor shall submit budget requests (BRs) - June/July.
• 	Negotiations - July through September. Negotiations proceed directly between the
contractor and the RO. The RO reaches agreement with the contractor in regard to
date, time, and location for negotiations. The contractor shall conduct negotiations
by telephone, correspondence, on-site visits or at the RO.
• 	Notice of Budget Approvals (NOBA) sent to contractor - September/October. In
the absence of a NOBA, a continuing resolution letter will provide interim
funding.
• 	Budget distribution - 30 days after the contractor receives its initial annual
NOBA.
• 	Budget distribution approval - 30 days after distribution is received by the RO.
To aid the contractor in its preparation and timely submission of required budget
preparation reports, see §270 for a checklist of the due dates and material to submit.
30 - Role of The Regional Offices (RO) - (Rev. 1, 08-30-02)
A1-1202, B1-4202
The ROs have the responsibility of negotiating and approving contractor budgets. The
Office of Financial Management has the authority to negotiate and approve budgets for
the Blue Cross/Blue Shield Association.
40 - Introduction of Activity Level Budget and Cost Reporting - (Rev. 1,
08-30-02)
A1-1203, B1-4203
Costs are allocated and reported separately by PM and MIP functions and activities.
Contractors and CMS are not allowed to co-mingle the PM and MIP funding that is
appropriated separately by Congress. PM provides funding for claims processing
functions, and MIP provides funding for payment safeguard functions. A function is a
unique operation that is separately identifiable, such as Claims Payment or Appeals. An
activity is defined as a subcategory of a Medicare function. The activities available to a
contractor may vary depending upon the functions performed by that contractor. A listing
of activities is available within the CAFM II reporting system utilized for Medicare
contractor budget and cost reporting.
50 - General CAFM II System Information - (Rev. 1, 08-30-02)
A1-1204, B1-4204
The CAFM II is an integrated, mainframe based software system utilized by CMS for the
budget, cost, and funds disbursement reporting requirements for both local contractors
operating under the terms of the current Medicare contract and those contractors
operating under a standard government contract generally pursuant to a solicitation.
50.1 - Budget and Cost Reports - (Rev. 1, 08-30-02)
A1-1204.1, B1-4204.1
The same multi-purpose format is used for the BR, the supplemental budget request
(SBR), the Interim Expenditure Report (IER), and the final administrative cost proposal
(FACP). The NOBA will be issued on a FY basis, and will provide a cumulative,
quarterly distribution of the budgeted funds. Funds will be drawn, via Smartlink, in line
with anticipated expenses not to exceed the cumulative, quarterly distribution on the
NOBA.
The CAFM II requires contractors to identify and report costs on an activity level basis
with detailed cost reporting and will sum these costs by function. The system will then
generate a separate PM and/or MIP budget that the contractor will certify for accuracy of
costs requested. The CAFM II User Manual contains instructions for accessing and
inputting data into CAFM II and §§90 and 100 of this manual contain general instructions
for completing the screens.
60 - List of Acronyms
(Rev. 128; Issued: 07-13-07; Effective: 10-01-06; Implementation: 08-13-07)
The following are acronyms that are used frequently throughout the Budget Preparation
chapter:
Acronym 	Text
ABCR 	Administrative Budget and Cost Report
ALJ 	Administrative Law Judge
BI 	Benefits Integrity
BPRs 	Budget and Performance Requirements
BR 	Budget Request
CAFM II 	Contractor Administrative-Budget and Financial Management System
CCR 	Cost Classification Report
CMS 	Centers for Medicare & Medicaid Services
CFR 	Code of Federal Regulations
CO 	Central Office
COB 	Coordination of Benefits
CROWD 	Contractor Reporting of Operational and Workload Data
CWF 	Common Working File
EDP 	Electronic Data Processing
EMC 	Electronic Media Claims
FACP 	Final Administrative Cost Proposal
FAR 	Federal Acquisition Regulations
FM 	Facilities Management
FY 	Fiscal Year
G&A 	General and Administrative
IER 	Interim Expenditure Report
PM 	Program Management
MR 	Medical Review
MIP 	Medicare Integrity Program
MSP 	Medicare Secondary Payer
NOBA 	Notice of Budget Approval
OIG 	Office of Inspector General
PET 	Provider Education and Training
PI 	Productivity Investment
PRRB 	Provider Reimbursement Review Board
RO 	Regional Office
ROI 	Return on Investment
SBR 	Supplemental Budget Request
UPIN 	Unique Physician Identification Number
70 - Exhibit of Administrative Budget and Cost Report Activity Form -
(Rev. 1, 08-30-02)
A1-1210, B1-4210
Click here to view Exhibit of Administrative Budget and Cost Report Activity Form.
80 - Completing the Administrative Budget and Cost Report Activity
Form - (Rev. 1, 08-30-02)
A1-1211, B1-4211
A. General
The Administrative Budget and Cost Report (ABCR) is intended for multiple-use. It is
used for the following specific annual, periodic, and monthly reports the contractor
submits.
• 	Budget Request (BR). See §230;
• 	Supplemental Budget Request (SBR). See §240;
• 	Interim Expenditure Report (IER). See Chapter 2, §60; and
• 	Final Administrative Cost Proposal (FACP). See Chapter 2, §130.
For all of these uses, funding and costs are reported separately by PM and MIP functions
and activities. Funding and costs for PM and MIP must be kept separate and may not be
co-mingled.
The contractor shall transmit the ABCR form for all budget reports electronically using
the CAFM II System. See §§270 and Chapter 2, §180 for due dates.
B. Identification of Costs
The ABCR identifies activities within each Medicare function. For each activity, the
following costs are separately identified: salaries and wages, fringe benefits, Electronic
Data Processing (EDP) equipment, other direct costs, other costs, non-Coordination of
Benefits (COB) credits, overhead, general & administrative (G&A), fee/profit, total cost,
other adjustments, forward funding, and total adjusted cost. Each Activity Screen also
identifies up to three discrete workloads and direct, indirect, subcontract, and
overhead/G&A hours.
The contractor shall separately identify costs in the BR, IER, and FACP pending a
determination of allowability by CMS. It shall identify these costs in the remarks section.
The principles for determining allowable administrative costs are in Part 31 of the
Federal Acquisition Regulation (FAR), as codified in Title 48, and in the
contract/agreement. In accordance with the FAR, costs are directly charged, where it is
possible to do so, and are allocated where it is not. Costs are assigned to various
Medicare activities on this basis.
The identification of unallowable costs is in Chapter 2, Budget Execution, § 200.3. The
contractor shall treat them as follows:
• 	It shall not include costs that the Secretary has determined to be unallowable or
that it and CMS have mutually agreed are not allowable; and
• 	It shall separately identify costs in the BR, IER, and FACP that have been
previously withheld by CMS pending a final determination of allowability. It shall
identify these costs in the Remarks section.
NOTE: The contractor shall round all cost entries to the nearest hundred dollars in the
BR and SBR.
90 - Explanation of Entries on the Activity Form - (Rev. 1, 08-30-02)
A1-1212, B1-4212
90.1 Title and Use - (Rev. 1, 08-30-02)
A1-1212.1, B1-4212.1
The title of the report, ABCR, and the use, i.e., BR, SBR, IER, or FACP.
90.2 - Contractor Number - (Rev. 1, 08-30-02)
A1-1212.2, B1-4212.2
The five-digit Medicare number assigned.
90.3 - Contractor Name - (Rev. 1, 08-30-02)
A1-1212.3, B1-4212.3
The contractor organization's official name.
90.4 - Activity Code - (Rev. 1, 08-30-02)
A1-1212.4, B1-4212.4
A 5-digit code identifying each activity. A listing of codes is available within CAFM II.
The first digit of an activity code identifies the activity as a PM activity (odd numbers) or
a MIP activity (even numbers). The second digit identifies the Medicare function, e.g.,
claims processing, appeals, etc. The last three digits refer to the specific activity or
project within each function.
90.5 - Funding FY - (Rev. 1, 08-30-02)
A1-1212.5, B1-4212.5
The FY for which funds are requested or to which costs are being reported.
90.6 - Reporting FY - (Rev. 1, 08-30-02)
A1-1212.6, B1-4212.6
The FY during which the funds are requested or during which costs are being reported.
90.7 - Report Month - (Rev. 1, 08-30-02)
A1-1212.7, B1-4212.7
The calendar month during which costs are being reported.
90.8 - Acceptance Date - (Rev. 1, 08-30-02)
A1-1212.8, B1-4212.8
The date CAFM II accepts the report.
90.9 - Cost Categories - (Rev. 1, 08-30-02)
A1-1212.9, B1-4212.9
The contractor shall report costs as defined below unless defined differently in its
contract.
A. 	Salaries/Wages
It shall include salaries, wages, bonuses, and incentive compensation payments to
directors, officers, and employees. It shall include charges made by agencies furnishing
temporary help and premium pay for time worked; overtime premium including premium
for Saturdays, Sundays, and holidays; and shift premiums. It shall include pay for time
not worked, i.e., rest periods, lunch periods, jury, and voting allowance. It shall include
vacations, sick leave, holidays, and military leave. It shall report salaries and wages in
accordance with the FAR 52.216-7(b). It shall report fringe benefits on the fringe benefit
line. It shall include all employees' salaries and wages except as noted in §§90.9H
(Overhead), 90.9I (General and Administrative), and 90.9P (Hours-Direct, Indirect,
Subcontracts, and Overhead /G&A - Exception).
B. Fringe Benefits
It shall include payments made to, or for the benefit of, employees over and above
normal salaries and wages. For example, contributions to employee insurance and
pension plans, post retirement benefits other than pensions, payroll taxes, supplemental
unemployment benefit plans, death benefits, and separation pay allowances. It shall
include such costs for all employees except as noted in §§90.9H (Overhead), 90.9I
(General and Administrative), and 90.9P (Hours-Direct, Indirect, Subcontracts, and
Overhead/G&A - Exception).
C. 	Electronic Data Processing (EDP) Equipment
It shall include rental/leases, depreciation, or the cost of maintenance and repairs,
insurance (if separately identifiable), systems software charges, personal property taxes,
and use charges. It shall include costs of mainframe and mainframe peripherals, personal
computers, local area networks (LAN), imaging equipment, printers, optical discs, optical
character recognition (OCR) equipment, and lap top computers. It shall report facilities
management (FM) subcontracts under subcontracts.
D. 	Subcontracts
It shall include all subcontract costs such as those involving computer operations, EDP
software, data entry, and provider auditing which require notification per the Medicare
contract/agreement. In addition, it shall include subcontracts in excess of $25,000 for
services related to all functions and duties whether approval is required or not. It shall
exclude services for janitorial, cafeteria, maintenance and other subcontracts such as
leases and rentals (see Other Direct Costs). It shall exclude EDP equipment subcontracts
that are charged to EDP equipment but include FM subcontracts and shared processing
arrangements.
E. 	Other Direct Costs
It shall include all other costs not included in the categories described above. This
includes, but is not limited to: leases for space and equipment, depreciation for company
owned space and equipment (except EDP equipment), return on investment, taxes (except
personnel taxes reported in fringe benefits), insurance (other than that reported in fringe
benefits or EDP equipment), dues to professional, trade, and business associations, net
food service costs (cafeteria and subsidized eating facilities), travel, communications,
postage, office supplies, material, medical review consultants and other consultants under
$25,000, printing costs excluding equipment, and general maintenance, janitorial and
security activities.
F. Other Costs
It shall use this category only with the concurrence of CMS. Most contractors are not
required to use this category. This category may include other indirect costs, excluding
overhead and general and administrative costs that a contractor might propose.
G. 	Non-COB Credits
It shall include the applicable portion of any income, rebate, allowance, or other credits
related to total operations. It shall not report COB credits in this category (See §190,
Certification Form.)
H. 	Overhead
It shall include all personal and non-personal service costs related to service departments
and financial, accounting, and statistical activities as described below.
1. Service Departments
It shall include all data related solely to the following service areas which support other
operations:
• 	Personnel - Recruiting, testing, hiring, orientation, centralized training staff,
maintaining employment files, administration of employee services such as
library, recreation unit, cafeteria, health unit, and employee publications.
• 	Methods and Procedures - Review and analysis of manual (non-EDP)
systems.
• 	Storeroom - Receipt, maintenance, and issuance of materials and supplies. It
shall not include the cost of the materials or supplies. They are included in
the areas where used.
• 	Printing and Duplication - To the extent possible, it shall distribute the costs
related to printing to the appropriate line item responsible for the end
product.
• 	Purchasing - If a separate unit, it shall include all activities related to
procurement of materials, supplies, furniture, equipment, and services. This
involves only the purchasing activity, not the cost of the purchases.
• 	Switchboard - If a separate centralized unit, it shall not include the costs of
telephone service identified with other operations.
• 	Mailroom and Interoffice Messengers - It shall include the cost and other
data related to the activity, unless they can be directly assigned to specific
lines. It shall include the cost of activities such as incoming (receipt, open,
sort, batch, and deliver) as well as outgoing mail. It shall not include the cost
of postage identified with other operations.
• 	Word Processing Centers
2. Financial, Accounting, and Statistical Departments
Includes accounting for and control of benefits, record keeping, and other fiscal tasks.
• 	Accounting for and Control of Benefits - It shall include benefit
disbursements, reissued checks, bank reconciliations, postpayment review of
benefit disbursements for internal control purposes, and overpayment
recoupments relating to individual billings.
• 	Record Keeping Tasks - It shall include general and cost accounting, payroll,
inventories (financial, not bills), and receipt of other funds, maintenance of
petty cash, and other non-benefit-related disbursements.
• 	Other Fiscal Tasks - It shall include budget preparation and cost reporting,
internal fiscal audits, company wide audit by CPA firms, and statistics
maintained and reports prepared in this operation, and external audit liaison
with the OIG and GAO.
3. Legal
General corporate legal costs allowable and allocable to Medicare, excluding provider
cost report appeals, and other activities directly identifiable to other operations (e.g.,
reconsiderations, reviews and hearings).
I. 	General and Administrative
It shall include total cost allocated to Medicare for the following:
1. General Management
Individuals responsible for overall corporate or Medicare matters. It shall prorate the cost
of individuals responsible for more than one operation, but not responsible for overall
corporate or Medicare matters to the operations for which they are responsible. It shall
charge the Medicare Coordinator (the person responsible for the overall Medicare
operation) to General and Administrative.
2. Contractor Operations Specialist
It shall include the cost of contractor operations specialists, CMS on-site representatives,
including the cost of services and space furnished to CMS.
J. 	Fee/Profit
It shall include only if allowed by contract/agreement, but only when payable from the
Government. (Also see Other Adjustments below.)
K. 	Total Cost
The sum of A-J above. Total cost excludes those accruals included in Other Adjustments
and Forward Funding, as defined below.
L. 	Other Adjustments
It shall include items for which reimbursement is not yet due per 48 CFR 52.216-7(b),
but which should be accrued to the period being reported. For example, it shall include
subcontract costs for which services have been received, but payment has not been made
to the subcontractor or fees which have been earned (non-COB credits and fee/profit), but
for which payment is not payable by CMS. CMS will provide guidance as to which
activity to report for fee/profit.
M. 	Forward Funding
It shall include the outstanding costs to be incurred for CMS-approved items for which
funding has been received, but the services extend into the subsequent FY. As costs are
incurred, these costs should be reported in A through J thus reducing the forward funding
balance. This category is not applicable to the budget request. If CMS has approved
projects for forward funding, then costs must be reported on the September IER and the
FACP.
N. 	Total Adjusted Cost
The sum of K through M above. See Note in Chapter 2, §130 for instructions for
administrative draws.
O. 	Workloads 1-2-3
Some activities may not have discrete workloads; other activities may have several
workloads and some only one workload. The contractor shall not fill in unless directed by
CMS. Workloads for bills/claims, inquiries, and appeals will be pre-filled from workload
reporting data drawn from Contractor Reporting of Operational and Workload Data
(CROWD) reports. Other workloads will be input by the contractor as directed by CMS.
See §100 for specific workloads to report.
P. 	Hours-Direct, Indirect, Subcontracts, and Overhead/G&A
It shall separately identify productive hours associated with salaries and wages and
overhead/G&A. It shall compute estimated hours per employee in accordance with the
Schedule of Net Hours Available, Form CMS-3258. (See §200.) It shall round net
productive hours to the nearest hour. It shall use Indirect and Subcontracts Hours only
with the concurrence of CMS.
It shall include hours directly assigned or otherwise allocated to a particular activity
during the FY. It shall include or exclude, as appropriate, personnel hours loaned and
borrowed by each operation. It shall include hours incurred by temporary help furnished
by outside organizations. For this reporting requirement, temporary help must meet all
the following criteria:
• 	Directly supervised by contractor personnel;
• 	Services performed on contractor premises;
• 	Used for limited time periods; and
• 	Obtained from an outside agency.
The contractor shall distinguish between temporary help and certain types of
subcontractors, such as data entry, where the services are used as an interim measure to
alleviate peak period workloads. Subcontract personnel provide a product or service, but
do not meet the criteria for temporary help. Examples of subcontractors are: programmers
who contract to provide software, but are not under direct control of contractor personnel,
and clerical personnel working offsite.
Exception: The contractor shall not report hours for employees assigned to general
maintenance, janitorial and security activities as they relate to its facility's upkeep and
protection. It shall include related personal service costs (salaries, wages, and fringe
benefits) as part of Other Direct Costs.
90.10 - Allocation of Overhead and General and Administrative Costs
(Rev. 26, 12-08-03)
A1-1212.10, B1-4212.10
The contractor shall allocate overhead and general and administrative costs to all
activities. with the exception of productivity investment (PI) activities. Incremental
overhead and general and administrative costs attributable to PI projects should be
eliminated from the allocation pool and included in the overhead and general and
administrative cost line items of the PI project. These allocations should be based on the
ratio of each activity's total costs to the sum of all activity costs. Included in costs are
salaries and wages, fringe benefits, EDP Equipment, other direct costs, other costs (if
applicable), and non-COB credits. It shall exclude subcontract costs from the calculation.
For example, the only ongoing activities the contractor performs is for Bills/Claims
Payment and Appeals. The Total Costs prior to " other adjustments" of salaries and
wages, fringe benefits, EDP equipment, other direct costs, other costs, and non-COB
credits equals $1,000,000 for the Bills/Claims Payment and the Subcontract cost is
$100,000. The same costs are $250,000 and $25,000 for Appeals and $50,000 and
$75,000 for Productivity Investments. Overhead for this period totaled $77,000 and
general and administrative (G&A) costs totaled $26,000.
Subcontract costs, other adjustments and forward funding are not considered in this
allocation.
Salaries &
Wages,
etc.
Overhead
Allocated
Percent
Allocated
G&A
Allocated
Percent
Allocated
Sub-
contracts
Total
Cost
Bills/Claims
Payment
$1,000,000 	$60,000 	80% 	$20,000 	80% $100,000 $1,180,000
Appeals 	250,000 	15,000 	20% 	5,000 	20% 	25,000 	295,000
Prod.
Investments
(PI)
50,000 	2,000 	0% 	1,000 	0% 	75,000 	128,000
Total Cost 	$1,300,000 	$77,000 	100% 	$26,000 	100% $200,000 $1,603,000
Less PI 	(50,000)
Basis for
Allocation
1,250,000
Less PI
Overhead &
G&A
(2,000) 	(1,000)
Allocable
Overhead &
G&A
75,000
25,000
The basis for this allocation excludes the direct PI cost and the incremental Overhead and
G&A costs attributable to the PI. In this example, 80% of the non-incremental Overhead
and G&A were allocated to Bills/Claims Payment because this activity comprises 80% of
the cost the total allocation base for Salaries & Wages, etc. ($1,000,000/$1,250,000).
In this example, 80 percent of the overhead and 80 percent of the general and
administrative costs were allocated to Bills/Claims Payment because salaries & wages,
etc. are that percentage of the basis. Subcontract costs, other adjustments and forward
funding are not considered in this allocation.
100 - Description of Operations - (Rev. 1, 08-30-02)
A1-1213, B1-4213
The following provides short descriptions of each function. Operations are first separated
into PM or MIP and then by function into activities. Each function may include multiple
activities. A list of activity codes is available in CAFM II. The contractor shall always
refer to the General Instructions and/or the BPRs for the most current description of the
activities for each function.
Once operational costs are segregated into PM or MIP, activities may be reported as
either:
• 	An operational functional activity;
• 	A PI activity; or
• 	A special project activity.
In addition, as directed by CMS, certain specific costs must be identified and
accumulated from one or more of the activities and reported a second time for
informational purposes on the Miscellaneous Schedule. (See §160.1.)
After the appropriate activity is selected, cost items are reported in categories on the
Activity Form in CAFM II. See §90.9 for a description of cost categories. Each activity
includes the usual direct and indirect charges associated with it. When staff personnel
have more than one area of responsibility, the contractor shall allocate their time and cost
equitably to the operations involved.
A variety of notification methods will be used to update required cost reporting (i.e.,
CAFM II "News," the BPRs, and other performance instructions). CAFM II will have a
current list of updated activities, including additions or changes in the PI activities,
special project activities, functional activities, and informational reporting on the
Miscellaneous Schedule.
100.1 - Bills/Claims Payment Function (Summary Level Code 11000) -
(Rev. 1, 08-30-02)
A1-1213.1, B1-4213.1
The contractor shall include the following:
The bills/claims payment function includes the costs and workload(s) associated with
processing Medicare bills/claims. The activities included in this function range from
provider enrollment, the receipt of initial bills/claims to the production of check or EFT
payment and remittance advice and Medicare Summary Notice. This function also
includes the costs for the common working file host and the UPIN Registry.
100.2 - Appeals Function (Summary Level Code 12000) - (Rev. 1, 08-30-
02)
A1-1213.2, B1-4213.2
The appeals function includes the costs and workload(s) to efficiently and effectively
control and respond to requests for appeal of Medicare determinations. This includes all
Part A reconsiderations and ALJ hearings processed and all activities related to the Part B
review and hearing process. For intermediaries, the costs of provider appeals related to
cost report settlements should be included as part of the Provider Settlements activity in
the Audit function.
100.3 - Inquiries Function (Summary Level Codes 13000 and 33000) -
(Rev. 1, 08-30-02)
A1-1213.3, B1-4213.3
The inquiries function includes the costs and workload(s) associated with inquiries
including Medicare customer service or billing/claims inquiries from beneficiaries or
providers by telephone, correspondence, walk-in or on-line inquiry. The costs of inquiries
received in the medical review (MR), Medicare Secondary Payer (MSP), and Benefit
Integrity (BI) departments should be charged to those activities. The carrier shall charge
the cost of beneficiary inquiries to obtain participating physician/supplier information to
participating physicians. However, it shall charge the costs of toll-free lines and
equipment to receive phone or electronic inquiries relating to the participating physician
activity and the costs of general inquiries from physicians to Inquiries.
100.4 - PM - Provider Education and Training (PET) Function
(Summary Level Code 14000) - (Rev. 1, 08-30-02)
A1-1213.4, B1-4213.4
The PM - PET function includes the costs for education and training directed at
providers, groups of providers, and in some cases, individual providers depending on the
scope of the problems or need for education. Costs of PET are allocated to both PM and
to MIP. Refer to §100.11 for MIP PET discussion.
100.5 - Provider Reimbursement Function (Summary Level Code
16000) - (Rev. 1, 08-30-02)
A1-1213.5
See §340.3. The Provider Reimbursement function (intermediaries) includes costs and
workload(s) for establishing and maintaining providers' accounting systems, submitting
cost reports for quality assurance and provider audits, maintaining records and files for
hospital-based physicians, and performing hospital cost reporting activities.
100.5.1 - Participating Physicians Function (Summary Code 15000)
(Rev. 1, 08-30-02)
B1-4213.5
The participating physician function (carriers) includes the costs for the continuation of
the annual participating enrollment, limiting charge monitoring activities and the
dissemination of participation information.
100.6 - Productivity Investments (PI) Function (Summary Level Code
17000)
(Rev. 26, 12-08-03)
A1-1213.6
The contractor shall include the cost of activities related to the development and
implementation of approved PIs and administrative enhancements as directed by CMS.
A. 	Activity Codes for Pis
Activity codes for PIs will be assigned to approved projects. A list of approved PIs will
be available in CAFM II. The contractor shall use only approved PI codes. The
miscellaneous PI activity code may be used only on the initial BR and the SBR for
projects that have not been approved and do not have an assigned PI activity code. It shall
not use the miscellaneous PI Activity Code on an IER or FACP.
1. 	PIs include administrative enhancements and legislative mandates directed by CMS
that are considered essential for maintenance of effective program operations. They do
not necessarily generate program savings.
2. 	PIs may include activities that affect more than one Medicare function and are
administered as a PI.
3. 	PIs also include systems conversions and transitions. See D below.
B. 	PI Funding
The PI funding is generally for first year start up costs only. Funding for subsequent years
is generally treated as an ongoing cost, not a PI, and should be included as an ongoing
operational cost in the contractor's BR. If PI funding after the first year is requested, a
schedule with funding for each FY should be included in the initial request for funding. If
CMS determines that PI funding for subsequent FYs is authorized, the contractor should
include the PI funding authorized in its BR every year it is authorized.
C. 	PI Costs
The contractor shall report incremental direct costs and incremental overhead and general
and administrative costs. If some of the non-incremental direct costs are incurred due to
reallocation of staff time, document it but do not request funding. Incremental direct
costs and incremental overhead and general and administrative costs may include:
• 	Incremental personal service costs of staff and management directly involved in
the project (including programmers).
• 	Materials and supplies used for the project
• 	Subcontract services, such as feasibility studies done under contract.
• 	EDP costs including data conversion, computer time and EDP support services
that are incurred only if the project is done. These costs should be spread to the
appropriate cost categories on the Activity Form. See Section 90.9. Include
special charges under a facilities management contract for programming changes.
Depreciation on equipment purchased in conjunction with the project should be
shown in the EDP equipment cost category; and
• 	Incremental overhead and general and administrative costs caused by any
increase:
■ 	in the cost incurred for overhead or general and administrative functions
(described in 90.9.H and 90.9.I) as a result of the PI project
implementation , or
■ 	in the Medicare allocation from the corporate overhead or general and
administrative pool due to an increase in the cost allocation base
D. 	System Conversions and Transitions
The following costs are included in systems conversions and transitions and may also
apply to other projects:
• 	Project Management Costs - Costs of essential staff/management project support;
• 	Software Installation Costs - Costs for installing and testing the software;
• 	File Conversion Costs - Costs for converting to the new system including the
costs of mapping, software development and testing;
• 	Interface Development and Implementation Costs - Costs to interface with
external programs e.g., for electronic data interchange, check writing, 1099
preparation, other reports and forms;
• 	Training Costs - Costs of staff training including train the trainer, technical staff
and user staff training costs; and
• 	Other Costs - Costs of provider education, outreach, and post- implementation
problem resolution.
E. 	Cost-Benefit Documentation for PI Projects
1. 	General
Before funding will be approved for a project that is proposed by a contractor, it must be
demonstrated to be cost-beneficial. A project will generally only be approved if the net
present value (NPV) for the project is equal to or greater than zero. The present value of
the savings is at least equal to the costs of implementation when both are discounted to
the same start date. As a general rule, CMS will consider only projects having a positive
NPV over 2 years. However, the contractor shall provide probable costs and savings
taken over all years of the project.
This documentation does not supplant the existing prior approval process or the threshold
amounts specified in the Medicare contract/agreement for system enhancements and
subcontracts.
2. 	Applicability
The contractor shall include cost-benefit documentation with all requests for PI funds.
The amount of the documentation required depends on the estimated cost and complexity
of the project. Administrative enhancements and systems transitions directed by CMS are
not subject to this cost-benefit test unless specifically required by CMS.
3. 	Documentation
The contractor shall document cost-benefit analysis using NPV calculations of costs and
savings discounted to the start date. A narrative explanation of cost-benefit analysis
should identify the assumptions for the analysis such as the start date, discount rate, and
costs and savings in each fiscal year. The contractor shall include the following items in
documentation:
• 	Estimated Cost - The contractor shall show cost items in categories reported for
activities. See §90.9 for cost categories. It shall provide underlying cost details
and the assumptions on which they are based for each material cost item. It shall
include personnel, machine time, materials and outside services in the estimate of
costs. It shall also include EDP charges and overhead. For capital expenditures in
excess of $500, it shall use standard procedures for establishing the asset's useful
life and for the depreciation schedule. CMS pays expenses when incurred; the
contractor shall include the proper depreciation and return on investment for the
period before implementation in its analysis.
• 	Administrative Cost Savings - The contractor shall outline any savings in staff
time, postage, and computer time. It shall include only cost reductions, not cost
avoidance. It shall reduce these savings by increases in administrative costs
attributable to the project (e.g., temporary productivity losses due to learning
curve, "downtime" for problem resolution, and depreciation for equipment
purchased).
• 	Benefit Savings - The contractor shall estimate the amount of benefit savings, if
any, which result from preventing or recovering erroneous payments, based on
policy in effect at the time of the analysis.
• 	Discount Rate - The contractor shall use the interest rate applicable under the
Prompt Payment Act to discount both the savings and costs to the start date. The
interest rate is published in the "Federal Register."
• 	Start Date - This is the point in time where the project first incurs costs and is the
date in time used to determine the Net Present Value of the project.
F. 	PI Workload
The contractor shall report no workload unless directed by CMS.
100.7 - Provider Enrollment - Medicare Program Administration
Function (Summary Level Code 19000) - (Rev. 1, 08-30-02)
A1-1213.7, B1-4213.7
The contractor shall use this summary level code only with the concurrence of CMS.
100.8 - Medical Review (MR) Function (Summary Code 21000) - (Rev.
1, 08-30-02)
A1-1213.8, B1-4213.8
MR is the efforts taken to prevent, identify, and address claim errors made by providers
including manual or automated review of claims to ensure that payments are made for
services that are covered and correctly coded. (For further information see the Program
Integrity Manual)
100.9 - Medicare Secondary Payer (MSP) Function (Summary Level
Code 22000) - (Rev. 1, 08-30-02)
A1-1213.9, B1-4213.9
The MSP function includes the costs and workload(s) for recovery activities related to
working aged; disabled; ESRD; workers' compensation; auto/liability/no fault; and other
activities related to MSP and identified by CMS.
100.10 - Benefit Integrity (BI) Function (Summary Level Code 23000) -
(Rev. 1, 08-30-02)
A1-1213.10, B1-4213.10
The Benefit Integrity function includes the costs and workload(s) associated with
receiving and processing complaints or allegations of Medicare fraud and abuse and
maintenance of associated databases. BI also includes self-initiated data analysis to detect
potential fraud and maintenance of associated databases, and the development of cases
for referral or further action. See work specifically required in §3900.
100.11 - MIP - Provider Education and Training (PET) Function
(Summary Level Code 24000) - (Rev. 1, 08-30-02)
A1-1213.11, B1-4213.11
The MIP - PET function includes the costs for education and training directed at
providers, groups of providers and, in some cases, individual providers depending on the
scope of the problems or need for education to avoid and detect waste, fraud, and abuse.
Costs of PET are allocated to both PM and to MIP.
100.12 - Audit Function (Summary Level Code 26000) - (Rev. 1, 08-30-
02)
A1-1213.12
The Audit function (intermediaries) includes the costs and workload(s) for Provider Desk
Reviews, Audits and Settlements. See §290.
100.13 - MIP Productivity Investments Function (Summary Level Code
27000) - (Rev. 1, 08-30-02)
A1-1213.13, B1-4213.12
The contractor shall use these lines only with specific authorization by CMS for MIP PI.
See the see the Program Integrity Manual for discussion of the PI activities.
100.14 - MIP-Medicare Program Administration (Summary Level Code
29000) - (Rev. 1, 08-30-02)
A1-1213.14, B1-4213.13
The contractor shall use this summary level code only with the concurrence of CMS.
110 - Exhibit of Special Projects Form - (Rev. 1, 08-30-02)
A1-1214, B1-4214
Click here to view Exhibit of Special Projects Form.
110.1 - Completing the Special Projects Form - (Rev. 1, 08-30-02)
1214.1, B1-4214.1
A. 	General
This schedule is used to identify special project activities. Special projects are defined as
those activities which may be of critical importance from an operational standpoint but
which are not materially significant from a financial standpoint viewed in the context of
the contractor's contract/agreement and its requirements. Therefore, reduced budget and
cost reporting is required. Special projects may relate to any underlying Medicare
function and/or to a specific activity. Because of the non-material (financial) nature of the
activity, the contractor shall charge only direct costs and specifically identifiable and
incremental overhead/G&A costs to the activity.
B. 	Uses
The schedule will be used only if there are special project activities to report. It will
generally not be used for the BR but may be used for any or all of the following: SBR,
NOBA, IER, and FACP. It shall not be used for cost reporting purposes unless funds are
provided in the NOBA.
C. 	Explanation of Entries on Special Projects Schedule
1. 	Code - Special projects are assigned to the 18000 series for PM activities and to the
28000 series for MIP activities. See §90.4 for a further discussion of activity codes.
2. 	Description - Brief description of the activity.
3. 	Productive Hours -The contractor shall include all productive hours. (See §90.9P.)
4. 	Salaries/Fringe Benefits - The contractor shall include all salaries, wages and fringe
benefits. (See §90.9 A-B.)
5. 	Subcontracts - The contractor shall include all subcontract costs. (See §90.9D.)
6. 	Other Costs - The contractor shall include all costs and, if applicable, non-COB
credits not included in personal service costs and subcontracts. This may include: EDP
equipment, other direct costs, other costs, non-COB credits and incremental
overhead/G&A. It should not confuse this cost category with the "other costs" reported
on the Activity Screen. See §§90.9C and 90.9E-I. It shall also include any adjustments or
forward funding when appropriate on the FACP. (See §90.9L-M.)
7. 	Total Cost - The sum of salaries/fringe benefits, subcontract and all other costs above.
Note that special project activity costs are NOT included in any other activity and must
be separately reported on this schedule and that total costs should equate to total costs as
defined in §90.9K and not to Total Adjusted Cost as defined in §90.9N.
8. 	Workload - The contractor shall report the related workload if appropriate.
120 - Exhibit of Schedule of Other Direct Costs (Schedule A) - (Rev. 1,
08-30-02)
A1-1215, B1-4215
Click here to view Exhibit of Schedule of Other Direct Costs (Schedule A)
120.1 - Completing the Schedule of Other Direct Costs (Schedule A) -
(Rev. 1, 08-30-02)
A1-1215.1, B1-4215.1
A. 	General
The contractor shall use this schedule to identify specific other direct costs included in
the Other Direct Costs line of the Activity Screen as defined in §90.9 E. A separate
Schedule A is completed for each activity requiring the specific identification of Other
Direct Costs.
B. 	Uses
The contractor shall complete this schedule only with the concurrence of CMS. It may
not be required of all contractors. If required, the schedule may be used for the BR, SBR,
IER and/or FACP.
C. 	Explanation of Entries on the Schedule A
1. 	Code - A three-digit code identifying each cost item. The contractor shall use 999 to
identify all remaining costs not requiring specific identification.
2. 	Description - A brief description of the discrete cost item. Types of costs to be
reported are described in §90.9 E and may also include such items as consultant fees, cost
of money and travel depending on the nature of the contractor's contract. Those items
requiring identification will depend on contract needs, materiality and other
considerations. The classification of costs in the contractor's cost accounting system,
government regulations and the contract will determine whether the cost is classified as
an Other Direct Cost.
3. 	Total Cost - The contractor shall report the total cost for each item. The total for all
Other Direct Costs, including those reported under 999 if applicable, must agree with the
total reported on the Other Direct Costs line of the Activity Screen.
130 - Exhibit of Schedule of Other Costs (Schedule B) - (Rev. 1, 08-30-
02)
A1-1216, B1-4216
Click here to view exhibit of Schedule of Other Costs (Schedule B)
130.1 - Completing the Schedule of Other Costs (Schedule B) - (Rev. 1,
08-30-02)
A1-1216.1, B1-4216.1
A. General
The contractor shall use this schedule to identify specific other costs included in the
Other Costs line of the Activity Screen as defined in §90.9 F. A separate Schedule B is
completed for each activity requiring the specific identification of other costs.
B. Uses
The contractor shall complete this schedule only with the concurrence of CMS. It may
not be required of all contractors. If required, the schedule may be used for the BR, SBR,
IER and/or FACP.
C. Explanation of Entries on the Schedule B
1. Code - A three-digit code identifying each cost item. The contractor shall use 999 to
identify all remaining costs not requiring specific identification.
2. Description - A brief description of the discrete cost item. Types of costs to be
reported are described in §90.9 F. Those items requiring identification will depend on the
nature of the contractor's contract/agreement, materiality and other considerations. The
classification of costs in its cost accounting system, government regulations and the
contract/agreement will determine whether the cost is classified as an Other Cost.
3. Total Cost - The contractor shall report the total cost for each item. The total for all
Other Costs, including those reported under 999 if applicable, must agree with the total
reported on the Other Direct Costs line of the Activity Screen.
140 - Exhibit of Schedule of Non-COB Credits (Schedule C) - (Rev. 1,
08-30-02)
A1-1217, B1-4217
Click here to view exhibit of Schedule of Other Costs (Schedule C).
140.1 - Completing the Schedule of Non-COB Credits (Schedule C) -
(Rev. 1, 08-30-02)
A1-1217.1, B1-4217.1
A. 	General
The contractor shall use this schedule to identify specific Non-COB Credits included in
the Non-COB Credit line of the Activity Screen as defined in §90.9 G. A separate
Schedule C is completed for each activity requiring the specific identification of Non-
COB Credits.
B. 	Uses
The contractor shall complete this schedule only with the concurrence of CMS. It may
not be required of all contractors. If required, the schedule may be used for the BR, SBR,
IER and/or FACP.
C. 	Explanation of Entries on the Schedule C
1. 	Code - A three-digit code identifying each credit item. The contractor shall use 999 to
identify all remaining credits not requiring specific identification.
2. 	Description - A brief description of the discrete credit item. Types of credits to be
reported are described in §90.9 G. Those items requiring identification will depend on the
nature of the contractor's contract, materiality and other considerations.
3. 	Total Credits - The contractor shall report the total credit for each item. The total for
all Non-COB Credits, including those reported under 999 if applicable, must agree with
the total reported on the Non-COB Credits line of the Activity Screen.
150 - Exhibit of Schedule of Other Adjustments (Schedule D) - (Rev. 1,
08-30-02)
A1-1218, B1-4218
Click here to view exhibit of Schedule of Other Adjustments (Schedule D)
150.1 - Completing the Schedule of Other Adjustments (Schedule D) -
(Rev. 1, 08-30-02)
A1-1218.1, B1-4218.1
A. 	General
The contractor shall use this schedule to identify specific Other Adjustments included in
the Other Adjustments line of the Activity Screen as defined in §90.9L. A separate
Schedule D is completed for each activity requiring the specific identification of Other
Adjustments.
B. 	Uses
The contractor shall complete this schedule only with the concurrence of CMS. It may
not be required of all contractors. Although described in this section, the schedule will
not be used in budget preparation. It may be used for the IER and/or FACP.
C. 	Explanation of Entries on the Schedule D
1. 	Code - A three-digit code identifying each adjustment item. The contractor shall use
999 to identify all remaining adjustments not requiring specific identification.
2. 	Description - A brief description of the adjustment item. Types of adjustments to be
reported are described in §90.9 L. Those items requiring identification will depend on the
nature of the contractor's contract, materiality and other considerations.
3. 	Total Adjustments - The contractor shall report the total adjustment for each item.
The total for all Other Adjustments, including those reported under 999 if applicable,
must agree with the total reported on the Other Adjustments line of the Activity Screen.
160 - Exhibit of the Miscellaneous Cost Schedule - (Rev. 1, 08-30-02)
A1-1219, B1-4219
Click here to view exhibit of the Miscellaneous Cost Schedule
160.1 - Completing the Miscellaneous Cost Schedule - (Rev. 1, 08-30-02)
A1-1219.1, B1-4219.1
A. 	General
The contractor shall use this schedule to identify specific "miscellaneous cost items."
This is a single stand-alone schedule and it does NOT tie to any Activity Screen. CMS
will specify any miscellaneous cost items to be reported.
B. 	Uses
The schedule is for tracking ANY miscellaneous costs within one or more activities that
need to be separately identified but are already included in the total costs of those
activities. It is used for the following specific annual, periodic, and monthly reports the
contractor submits to CMS.
• 	Budget request - See §230
• 	Interim Expenditure Report - See Chapter 2, §60.
• 	Final Administrative Cost Report - See Chapter 2, §60.
C. 	Explanation of Entries
1. 	Code - A miscellaneous code is assigned within the 10000 series for PM activities,
the 20000 series for MIP activities, and the 51000 series if it pertains to both PM and
MIP. The code is followed by a 2-digit code to identify specific cost items. CMS will
identify miscellaneous codes to report. See §90.4 for further discussion of activity codes.
2. 	Description - Brief description of the activity.
3. 	Costs - The contractor shall include personal service, subcontract and all other costs
as appropriate. Miscellaneous costs should include accruals.
4. 	Workload - The contractor shall report the related workload if appropriate.
5. 	Net Hours Available - The contractor shall report the number of net hours available
per employee. (See §200.1.)
170 - Exhibit of Cost Classification Report, Form CMS-2580 - (Rev. 1,
08-30-02)
A1-1220, B1-4220
Click here to view exhibit of Cost Classification Report Form
180 - Completing the Cost Classification Report, Form CMS-2580 -
(Rev. 1, 08-30-02)
A1-1221, B1-4221
The contractor shall submit the Cost Classification Report (CCR), Form CMS-2580, with
estimated costs identified by major classifications. It shall submit it with both the BR and
the FACP.
NOTE: Only one combined PM/MIP CCR is required with the BR and the FACP.
The contractor shall round entries to the nearest $100 for the budget request and nearest
$1 for the FACP.
180.1 - Column A - (Rev. 1, 08-30-02)
A1-1221.1, B1-4221.1
This column will sum all activities to equal Total Adjusted Cost less Overhead, General
and Administrative and Other Adjustments. The following fields will be pre-filled:
Salaries and Wages, Fringe Benefits, EDP Equipment, Subcontracts, Credits and Forward
Funding. The contractor will identify and enter Other Direct Costs among the following
applicable cost classification categories: Facilities and Occupancy, Outside Professional
Services, Telephone and Telegraph, Postage and Express, Furniture and Equipment,
Materials and Supplies, Travel, Return on Investment, Miscellaneous and Other. See
§§90.9 and 180.5 for a description of each cost classification category.
180.2 - Column B - (Rev. 1, 08-30-02)
A1-1221.2, B1-4221.2
The contractor shall use this column to allocate total Overhead and General and
Administrative costs from all activity forms to the applicable cost classification
categories. See §§90.9 and 180.5.
180.3 - Column C - (Rev. 1, 08-30-02)
A1-1221.3, B1-4221.3
The contractor shall use this column to allocate total Other Adjustments from all Activity
Forms to the applicable cost classification categories. (See §§90.9 and 180.5.) It shall not
use this column in the budget request (BR).
180.4 - Column D - (Rev. 1, 08-30-02)
A1-1221.4, B1-4221.4
The sum of columns A-C to equal Total Adjusted Costs for all Activity Forms.
180.5 - Cost Classification Categories - (Rev. 1, 08-30-02)
A1-1221.5, B1-4221.5
A. 	Salaries and Wages 	See §90.9.
B. 	Fringe Benefits 	See §90.9. The contractor shall include the portion of
fringe benefits allocated for contributions to employee
pension plans. Also, it shall separately identify pension
plan expense.
C. 	Facilities and
Occupancy
The contractor shall include:
Rent-leasehold;
Amortization-leasehold improvements;
Depreciation or rental of company-owned buildings;
Real estate and property taxes;
Insurance on property;
Power, heat and light;
Personal service costs and/or facility service agreements
related to general maintenance, janitorial and security;
Repairs; and
Other - licenses or permits related to buildings or their
components.
D. 	EDP Equipment 	See §90.9.
E. 	Subcontracts 	See §90.9.
F. 	Outside Professional
Services
The contractor shall include charges for professional
services rendered by outside consultants. This includes
medical and management-type consultants.
G. 	Telephone and
Telegraph
Self explanatory
H. 	Postage and Express 	Self explanatory
I. 	Furniture and
Equipment, Other
Than EDP
The contractor shall include:
Rental or depreciation;
Expense items under $500;
Maintenance and repairs; and
Use charges.
Examples of items that fall within the category of
furniture and equipment are:
Desks and chairs;
Office machines--typewriters, calculators;
Filing cabinets; and
Microfilm equipment.
The contractor shall capitalize and depreciate furniture
and equipment costing $500 or more per item and with a
useful life of more than 1 year. It shall not include the
expense of leased and company-owned autos.
J. 	Materials and
Supplies
The contractor shall include all expendable items such as
general office supplies and EDP supplies.
K. 	Travel 	The contractor shall include costs for transportation,
meals, and lodging. It shall include the cost of leased
autos and all costs associated with company-owned
vehicles. It shall not include personal service costs related
to individuals in travel status.
L. 	Return on
Investment (ROI)
If applicable, the contractor shall include
charges related to application of the
investment rate of return to the average
undepreciated balance of capitalized assets
for the period. It shall calculate ROI using
the portfolio rate of return for the contract
period instead of the treasury rate. It shall
include the following ROI schedule.
ROI Calculations FY:
Average undepreciated balance of assets
allocable to Medicare. 	( $ A)
Contractor's portfolio rate of return for the
contract period 	(B) %
Total ROI (A x B). 	$ ______
M. Miscellaneous 	The contractor shall include:
Taxes, other than personnel and real property;
Insurance, other than that included in §§180.2, 180.3, and
180.4;
Dues to professional, trade, and business associations;
Net food service costs (cafeteria and subsidized eating
facilities); and
All other costs not specifically identified elsewhere.
Contractor shall specifically identify all other costs over
$2,500 in Remarks.
N. 	Other 	The contractor shall identify in Remarks Section.
This is reserved and should not be used without explicit approval of CMS.
O. 	Credits 	The contractor shall include the applicable portion of any
income, rebate, allowance, or other credits related to total
operations. This includes, but is not limited to, Medicare
data used for complementary health insurance and/or
Medicaid claims processing by it or another organization.
The credits reported must equal the total COB credits
reported on the certification schedule, plus the sum of
non-COB credits included on the activity forms. (See
§§90.9G and 190.C.)
P. 	Forward Funding 	See §90.9. The contractor shall use this category only
with the FACP.
180.6 - Total - (Rev. 1, 08-30-02)
A1-1221.6, B1-4221.6
The sum of the items on Form 2580. The amount in Column D must be identical to the
Total Cost of the Budget Request or Total Adjusted Costs of the FACP.
180.7 - Pension Costs - (Rev. 1, 08-30-02)
A1-1221.7, B1-4221.7
The contractor shall identify pension plan expenses included in fringe benefits, Column
D.
180.8 - Remarks - (Rev. 1, 08-30-02)
A1-1221.8, B1-4221.8
The contractor shall include any appropriate comments.
190 - Exhibit of Certification Form - (Rev. 1, 08-30-02)
A1-1222, B1-4222
Click here to view exhibit of Certification Form.
190.1 - Completing the Certification Form
(Rev. 149; Issued: 03-27-0; Effective Date: Upon the start of the contractor’s next
option year; Implementation Date: 04-27-09)
A. General
There are four sections that are utilized by the user to generate the PM certification. They
are: Credit, Activity Summary by Function, Administrative Funds Drawn and
Certification Screen. For MIP, there are three sections. They are: Activity Summary by
Function, Administrative Funds Drawn and Certification Screen.
For PM, the user will enter the COB credits. After the user has entered all COB credit
information, the system will sum the data to a "face sheet" amount by Medicare function,
for Total Cost and Total Adjusted Cost, including a separate line for COB credits. The
contractor will attest to the accuracy of the data included in the report by completing a
certification statement.
B. Uses
The form will be used for the BR, SBR, IER, and FACP.
C. Completing the Certification Section
1. Credit Amount
The contractor shall enter the separate cumulative amounts of cash received for
Complementary Credit and Medicaid to equal total credits. The user must also enter the
separate amounts of accrued credits in total. Accrued credits represent outstanding
receivables (invoices that have been billed but payments have not been received as of
report date). This section must be completed prior to generation of the Certification
Section.
The complementary credits shall be reported in the following manner:
Complementary Credit – Not applicable unless the Medicare contractor receives late
payment for a transitioned COBA trading partner.
Medigap – the contractor shall report all complementary credits received from trading
partners as a result of crossing over claim-based Medigap claims to trading partners. An
agreement may be in place for transmission purposes.
COB Credits – the contractor shall report only the cash received from the COBC for
claims crossed over in COBA production.
Accrued Credits – the contractor shall report all receivables due from trading partners
that the contractor invoiced for themselves.
Accrued COB Credits – the contractor shall report all receivables due from the COBC
for claims transmitted to the COBC for crossover in COBA production (adjusted by
reimbursement, error reports, including accepted trading partner disputes that were
returned to the contractors, and other adjustments reported on the contractor remittance
advice).
2. Activity Summary By Function Section
This is a system-generated area. The system will sum the data to a total face sheet by
Medicare function. No input is required by the user; however, the total must tie to
subsidiary records.
3. Administrative Funds Drawn Section
This section is completed only for the IER. (See Chapter 2, section 60.6.)
4. Certification Section
The contractor shall enter name of Certifying Official and Title. An authorized official
signs and dates the hard copy report and retains a copy in file.
5. Remarks Section
The contractor shall complete this section when appropriate.
Medicare Administrative Contractors and Durable Medical Equipment Medicare
Administrative Contractors ONLY
A. General
Contractors shall report all workloads, net errors reported to them by COBC via the
shared system for crossover claims to their respective project officers. Cash received
from the COBC shall be recorded in the Analysis Reporting and Tracking System (ARTs)
monthly.
Contractors shall utilize cash base accounting methodology to validate the COBC’s
complementary credit data effective with the start of contractor new option year.
200 - Exhibit of Schedule of Net Hours Available, Form CMS-3258 -
(Rev. 1, 08-30-02)
A1-1223, B1-4223
Click here to view exhibit of Schedule of Net Hours Available, Form CMS-3258.
200.1 - Completing the Schedule of Net Hours Available - (Rev. 1, 08-30-
02)
A1-1223.1, B1-4223.1
This form is not a required attachment to the initial Budget Request unless specifically
requested by the contractor's RO. It is provided here for illustration purposes since the net
hours available figure must appear on the BR. It is calculated as described below.
NOTE: The net hours available reported on each IER and the FACP will be based upon
the net hours available shown on the contractor's initial BR.
A. 	Contractor
Name and Address
Contractor enters the organization's official name and
address.
B 	Identification
Number
Contractor enters the five-digit Medicare-assigned
contractor number.
C. 	Fiscal Year 	Contractor enters the fiscal year that corresponds to
the administrative budget and cost report
D. 	Line 1 - Period 	Contractor indicates the months involved.
E. 	Line 2 - Cumulative Days
per Period
Contractor indicates the calendar count of days
involved
F. 	Line 3 - Weekends 	Contractor indicates the calendar count of weekend
days involved.
G. 	Line 4 - Holidays 	Contractor indicates the calendar count of holidays
involved.
H. 	Line 5 - Average
Vacation
Contractor indicates the average vacation per
employee based on personnel records.
I 	Line 6 - Average
Sick Days
Contractor indicates the average sick days per
employee based on personnel records.
J. 	Line 7 - Other Leave
Average
Contractor indicates the average days used for other
leave per employee based on personnel records.
K. 	Line 8 - Total Days Off 	Sum of lines 3, 4, 5, 6, and 7.
L. 	Line 9 - Days Available 	Line 2 minus Line 8
M. 	Line 10 - Working Hours
Per Day
Contractor enters the normal working hours per day.
N. 	Line 11 - Authorized Break-
time
Contractor enters the amount of time employees are
authorized to use for nonproductive purposes, e.g.,
coffee breaks.
O. 	Line 12 - Net
Cumulative Daily Hours
Available
Line 10 minus Line 11.
P. 	Line 13 - Net Hours
Available Per Employee
Line 12 multiplied by Line 9.
210 - Contractors Performing Services for Other Medicare Contractors
- (Rev. 1, 08-30-02)
A1-1230, B1-4230
Where services such as bill processing, EDP services, provider audit, or appeals
processing are performed by one contractor for another, the following budget preparation
procedures apply.
210.1 - Servicing Contractor - (Rev. 1, 08-30-02)
A1-1230.1, B1-4230.1
The servicing contractor furnishes the receiving contractor an appropriate estimate of the
costs described in §100 by activity.
The estimates are submitted on the Activity Form by cost category. For provider audit, it
furnishes the Contractor Auditing and Settlement Report with applicable activities and
columns completed. ( See §290.) The estimate for these services includes all direct, and
an equitable share of indirect, costs expected. All estimates are in accordance with the
principle that neither the contractor providing the service nor the contractor receiving the
service incurs a profit or loss on the transaction. The contractor shall not include related
estimated costs as part of its budget submission. It shall furnish this information to the
receiving contractor.
210.2 - Receiving Contractor - (Rev. 1, 08-30-02)
A1-1230.2, B1-4230.2
The receiving contractor includes the estimated costs, furnished by the servicing
contractor, as a subcontract cost and identifies the servicing contractor in the Remarks
section of that Activity Form.
220 - Budget Justification - (Rev. 1, 08-30-02)
A1-1240, B1-4240
The annual BPRs describes the statement of work and level of effort for each Medicare
function to which the contractor must adhere. The General Instructions section of the
BPRs details the narrative, analysis, worksheets and data requirements that constitute the
general instructions for the budget justification. Additional requirements may be
identified in each functional area. The contractor shall refer to the BPRs for the current
year's budget justification requirements.
230 - Completing the Budget Request - (Rev. 1, 08-30-02)
A1-1255, B1-4255
The contractor uses this basic document for submitting the annual estimate of costs for
administrative functions and duties related to the Medicare program. The format and
related explanations must furnish sufficient information to permit a meaningful review of
the estimates. The information requested and as supplemented by the BPRs form the
basis for the budget data for each FY.
The base period for preparation and comparison of the BR is the prior year's budget
unless otherwise stated in the BPRs. The contractor shall consider its most recent
experience in preparing financial cost estimates.
230.1 - Transmittal - (Rev. 1, 08-30-02)
A1-1255.1, B1-4255.1
The contractor shall transmit the complete BR consisting of the activity forms and
supporting schedules via CAFM II.
230.2 - Hard Copy Requirements - (Rev. 1, 08-30-02)
A1-1255.2, B1-4255.2
The contractor shall submit the original to the RO and one copy to CO of all forms, all
supporting schedules, and all narrative justifications that are not transmitted via CAFM
II. It shall address CO hard copies to:
Centers for Medicare & Medicaid Services
Division of Financial Operations, OFM
7500 Security Boulevard
Baltimore, Maryland 21244
230.3 - Activities - (Rev. 1, 08-30-02)
A1-1255.3, B1-4255.3
Descriptions of these items are in §§100.
230.4 - Hours - (Rev. 1, 08-30-02)
A1-1255.4, B1-4255.4
The contractor shall enter hours as developed using instructions in §90.9P. It shall round
to the nearest hour
230.5 - Costs - (Rev. 1, 08-30-02)
A1-1255.5, B1-4255.5
The contractor shall enter costs and credits as in §90.9. It shall round entries to the
nearest hundred dollars.
230.6 - Workload - (Rev. 1, 08-30-02)
A1-1255.6, B1-4255.6
The contractor shall enter the workloads for the budget period. (See §90.9O.)
230.7 - Net Hours Available (Miscellaneous Section) - (Rev. 1, 08-30-02)
A1-1255.7, B1-4255.7
The contractor shall enter the number of net productive hours required to convert total
productive hours to equivalent staff-years for the budget period. (See §200.)
230.8 - Narrative and Financial Analysis Requirements - (Rev. 1, 08-30-
02)
A1-1255.8, B1-4255.8
The contractor shall include a narrative analysis (budget justification) that summarizes
the funding and workload requested for each line of operation. The analysis shall provide
information that fully justifies its request, includes all required forms as defined herein,
and meets the requirements stated in the annual BPRs. Operations personnel should
actively participate in the development of the BR.
If CMS workload volumes are supplied and those volumes are acceptable, no volume
analysis is required. Requests for changes in workload from any CMS provided volumes
must be supported by a volume analysis that includes the historical data used to make the
projection, a description of the forecast methodology used and the actual forecast
computation. This applies to all line items with identifiable workload volumes.
230.9 - Financial Information Survey - (Rev. 1, 08-30-02)
A1-1255.9, B1-4255.9
This survey must be completed and submitted in hard copy as an attachment to the
contractor's initial BR.
If the contractor has a new severance policy in place or its previous severance policy has
been updated, it shall:
• 	State the effective date for the new or updated severance policy.
• 	Summarize its severance/separation pay policy including both management and
staff. State the length of service criteria, types of cost covered by the policy, the
effective date of the policy and any other criteria used in determining the amount
of payment. Identify and discuss any related benefits which may be payable to or
on behalf of the employee beyond the standard severance payment(s).
• 	Attach a dated extract of its corporate severance pay policy and any related
benefits payable to or on behalf of the employee related to the severance or
separation.
• 	If there is no change since the submission of the initial BR for last year, state "No
Change."
The contractor shall estimate the number of direct Medicare employees (excluding
temporaries) in this BR FY, the average number of years that staff and management have
been employed full time on the Medicare contract and average number of years each has
been with the corporation:
• 	No. of direct Medicare employees: 	Staff _____ 	Management _____
• 	Avg. yrs. employed Full Time with
Medicare: Staff _____ 	Management _____
• 	Avg. yrs. employed with corporation: 	Staff _____ 	Management _____
The contractor shall indicate whether, during the last two years or for this BR, it has
acquired or intends to acquire (through lease or purchase) any Electronic Data Processing
Equipment (as reported on the Cost Classification Report, see §180.4) or any EDP
operations change which will result in a TOTAL charge (not annual depreciation) to the
Medicare program exceeding $500,000?
Yes or No _________
If yes, it shall state the following:
• 	Month and year of acquisition:
• 	Type of acquisition (new lease, replacement lease, purchase):
• 	Reason for acquisition (obsolescence, overcapacity):
• 	Amount included in this BR for the equipment or operations change: $_______.
• 	Total number of depreciable years _________
• 	Number of depreciable years remaining:__________
NOTE: Any response to the above does not constitute prior notice/approval as required
by the contract.
The contractor shall provide a breakdown of the "average un-depreciated balance of
assets" allocated to Medicare as included in the Cost Classification Report (CCR) for this
BR (See §180.51.)
Facilities or Occupancy: 	$ ______
Furniture and Equipment: 	$ ______
Electronic Data Processing Equipment: 	$ ______
Other (specify): 	$ ______
Total (agree to CCR): 	$ ______
The contractor shall identify all leases or rentals in effect in this BR FY for
facilities/occupancy, furniture and equipment, EDP equipment, and Other where the
annual charge to Medicare for this BR FY will equal or exceed $500,000. It shall provide
the annual amount included in the FY BR and lease/rental expiration month and year. If
none, it shall state none.
NOTE: The contractor's RO may require a listing of all subcontracts/leases for review.
The contractor shall contact its RO if it is in doubt.
In conjunction with the facilities and occupancy costs, provided as Item 3 on the Cost
Classification Report, the contractor shall summarize the Medicare costs by general
categories below. It shall include base and budget period costs:
It shall complete the following information:
Indicate Base Period you are using: ___________
1. 	Depreciation and Rent or Lease:
• 	Depreciation Base Period:_______ 	Budget Year: _______
(Use when buildings and land are owned. Building costs are total costs excluding interest
expenses, but including parking lots, landscaping, etc.)
• 	Rent or Lease: Base Period: _______ 	Budget Year: _______
(Use when facilities are rented either from an outside source or an affiliate. These costs
include amortization of leasehold improvements.)
2. 	Utility Costs: 	Base Period: _______ 	Budget Year:________
(Report power, heat, and light for owned space and where not included in rental or lease
costs.)
3. 	Other Costs: 	Base Period: _______ 	Budget Year: _______
(This includes items such as janitorial services, security, carpentry, plumbing, electrical
and all work associated with non-permanent type partitioning and moving operations
within the building, if not included in the rental or lease cost.)
4. 	Total Costs: 	Base Period: _______ 	Budget Year: _______
(Total cost of 1 through 3 to agree with Facility and Occupancy costs reported on the
Cost Classification Report.)
5. 	Cost Per Net Usable Square Foot: See Appendix B, Article X.B. of the Medicare
contract/agreement for the definition of net usable space.
Base Year: 	Total Cost: ______ 	Square Feet: _____ 	Cost Per Sq. Foot: ____
Budget Year: 	Total Cost: ______ 	Square Feet: _____ 	Cost Per Sq. Foot: ____
240 - Additional Instructions Pertaining To Supplemental Budget
Requests (SBRs) - (Rev. 1, 08-30-02)
A1-1256, B1-4256
A. General
These instructions pertain to SBRs filed after action is taken on the initial BR discussed
in §230. An SBR is a contractor's request for additional funding after the FY has begun.
The SBR is a request for additional funding for one or more activities. To the extent that
the request, if approved, would result in a reclassification of the non-incremental costs
and hours charged to other activities/functions, the contractor shall submit a schedule of
non-incremental costs in accordance with §100.6C. It is not copied from either the
NOBA or the BR. The contractor shall use the BPRs as a basis for providing its SBR
justification. A SBR is generally filed after the contractor receives a NOBA for the full
FY and it determines that there are insufficient funds to perform the statement of work
outlined in the BPRs and the NOBA. A SBR may also be required if there is a special
project for which it would like to request funding. Refer to §100.6 regarding PIs.
An SBR may also be required in response to a CMS-generated request that a contractor
perform a specific task. Such a CMS-generated request should be in writing and may
include written procedures, manual issuances or any written request for work pertaining
to special projects.
A copy of the SBR, with rationale, must be sent to both the contractor's RO and CO at the
time the SBR is transmitted via CAFM II. It shall send a copy to CO to the same address
that it sends its BR. See §230.2 for address.
B. Definitions
The contractor shall base the SBR on the latest released NOBA or negotiated budget and
any outstanding SBRs. An SBR is appropriate if there is a need for a change in total
funding, a transfer of funds among functions, and/or a change in workload. The
contractor shall select the correct activity code and enter incremental costs including
hours and workload. It shall annotate in the Remarks section of the Activity Screen the
NOBA number on which the current SBR is based.
EXAMPLE: An SBR requesting additional claims funding of $200,000, workload of
150,000 along with additional telephone inquiries funding of $100,000 and workload of
25,000 would be transmitted as follows:
Activity Code 11001, (Bills/Claims Processing): 	$200,000 	Workload 150,000
Activity Code 13001, (Telephone Inquiries): 	$100,000 	Workload 25,000
Remarks: This SBR is based on NOBA #1.
The contractor shall not include funding previously requested and denied unless it is
specifically re-requesting funding for this item and has provided a revised budget
justification to support the request.
C. Shared Systems
The CMS requires that each user group designate one of its members to submit SBRs for
systems improvements on behalf of the group or, if the servicing subcontractor (the
subcontractor performing the systems improvement work) is also a Medicare contractor,
that the SBR be submitted by that Medicare contractor.
If the servicing subcontractor is a commercial vendor, the SBR must be submitted by the
designee on behalf of the group through the designee's parallel RO or the designated RO
with a copy to CO. If the servicing subcontractor is another Medicare contractor, that
contractor submits the SBR to its parallel RO or the designated RO with a copy to CO.
In all cases, the SBR submitted is consolidated to include the request for the servicing
subcontractor and any related funds requested by the other user group members.
However, the consolidated SBR will clearly state the amount(s) requested on behalf of
each user as well as the servicing subcontractor, any unique user expenses for each user
pertaining to the shared system activity, and delineate projected savings for each user.
All funding through the NOBA is to the designee or Medicare contractor. Cost reporting
corresponds to the NOBA. User unique expenses such as training and/or related travel are
funded directly to each user with costs reported accordingly. This applies even though the
requested funds are included in the consolidated SBR.
The designated contractor is responsible for amending its subcontract with the
maintenance vendor, requesting prior approval if the project costs exceed its threshold in
the prime contract and accounting for proper expenditure of the project funds.
D. Minimum Documentation Requirements – Justification
A complete SBR must include transmission on CAFM II and submission of a written
justification supporting the request. An appropriate official must submit the justification.
The justification must provide sufficient detail for each cost category (see §90.9 and
below) and explicitly link the request to the BPRs and/or general instructions that require
the work and cost.
If the request equals or exceeds the smaller of $100,000 or 5 percent of the total PM or
MIP NOBA, whichever is applicable, the contractor shall define the major steps
necessary to accomplish the proposed effort (at least 3 steps) and provide an operational
and financial rationale which addresses each of the cost categories for each step. If the
activity cannot be broken down into at least 3 steps, it shall explain why not.
The operational rationale should explain the scope and types of efforts contemplated. The
financial rationale should explain how the estimated funding needs were determined for
each cost category through the identification of assumptions, supporting information and
calculations used to arrive at the estimated amounts.
1. Salaries/Wages and Fringe Benefits
The contractor shall provide job classes, number of employees (actual or FTEs), rates,
period of work, major deliverables and/or milestones with dates. It shall discuss any
premium payments. (These two cost categories may be combined.)
2. EDP Equipment
The contractor shall discuss how the amount was determined or allocated and identify
any extraordinary items required. If any equipment is to be leased or purchased, it shall
provide details and, if appropriate, include a cost-benefit analysis.
3. Subcontracts
The contractor shall identify subcontractor, scope, major deliverables, period of work and
rates.
4. Other Direct Costs
The contractor shall discuss how the amount was determined or allocated and any
extraordinary items required. If any items are to be leased or purchased, it shall provide
details and, if appropriate, include a cost-benefit analysis.
5. Overhead/G&A
The contractor shall discuss how the amount was determined or allocated and any
extraordinary items required. (These two cost categories may be combined.)
6. Hours
The contractor shall identify and discuss both direct and subcontract hours.
7. Workloads
The contractor shall identify and discuss all significant workloads.
250 - The Notice of Budget Approval (NOBA) - (Rev. 1, 08-30-02)
A1-1261, B1-4261
A NOBA is issued by CMS to notify contractors of approved amounts for PM and MIP
administrative expenses for the FY, including the amount of funds certified to be
available. Contractors are not authorized to incur expenses in excess of the total certified
amount for PM or MIP. PM and MIP funding must not be co-mingled and this limitation,
therefore, applies to each separately. In addition, the contractor shall refer to the BPRs
and/or the contract/agreement for the authority to shift funds among PM or MIP
functions.
The first NOBA issued for a FY is given a supplemental number of "0". Subsequent
NOBAs are numbered sequentially. Where agreement on a budget cannot be reached,
CMS issues a NOBA for less than the full FY year pending completion of negotiations.
These NOBAs are annotated as a partial approval in the "Remarks" section and numbered
as above. CMS may issue NOBAs for less than a full FY when necessary.
All dollar amounts will be rounded to the nearest hundred, hours to the nearest hour, and
bills payment workload to the nearest hundred. The end of FY NOBA is not rounded.
There are separate summary screens and certifications for PM activities and MIP
activities.
The NOBA displays information by function and activity. See §100 for definitions of
functions and activities. For each function and activity, hours, total cost, and workload
will be displayed. The hours, total cost, and workload shown for a function is the sum of
the data input for the activities for that function.
250.1 - End of FY NOBA - (Rev. 1, 08-30-02)
A1-1261.1, B1-4261.1
When claimed costs are less than the total approved for the FY, CMS issues a revised
NOBA reducing the FY funding to the amount claimed on the FACP. This reduction
keeps the amount of obligated funds to a minimum, thereby permitting maximum
flexibility in the use of appropriated funds. If the contractor subsequently finds that not
all costs have been claimed, it submits a revised FACP.
If the administrative cost reported in the October - September IER or FACP exceeds the
total approved budget, the contractor shall justify the over expenditure to the RO with a
copy to CO. CMS reviews the over expenditure for adherence to contract provisions on
prior notice and abatement and other considerations and, where appropriate, issues a
revised NOBA that enables the contractor to draw additional funds.
The incidences of such end-of-year over-expenditures are few since notification is
necessary more than 60 days prior to the end of the FY if either CMS or the contractor
expects that the budgeted amounts are not sufficient to cover administrative costs.
250.2 - Cumulative Quarterly Distribution - (Rev. 1, 08-30-02)
A1-1261.2, B1-4261.2
This indicates the approved cumulative quarterly distribution for PM and/or MIP. Funds
should not be drawn in excess of the lesser of the quarterly distribution or the contractor's
expenses. The quarterly distributions for PM and MIP are separate.
The PM and MIP distributions and costs must be treated separately in determining the
amounts to draw for administrative expenses for each.
250.3 - Certifying Official - (Rev. 1, 08-30-02)
A1-1261.3, B1-4261.3
This signature indicates approval of the NOBA by the delegated RO official. In many
cases the contractor will not receive a signed copy of the NOBA. The RO will "release"
the NOBA within CAFM II, which signifies certification and will include the official's
name and title. An explanation of the nature of the NOBA will be included in the
Remarks section on this certification page. The RO will notify the contractor via phone or
e-mail when the NOBA has been certified and released in CAFM II.
Click here to view exhibit of Schedule of Net Hours Available, Form CMS-3258
270 - Budget Preparation Check List for Program Management And
Medicare Integrity Program
(Rev. 128; Issued: 07-13-07; Effective: 10-01-06; Implementation: 08-13-07)
FORM NAME 	DUE TO 	DUE DATE
Initial Budget Request - Activity Forms - (with
following attachments as required by CMS)
CMS 	June/July
Miscellaneous Schedule
Special Projects Schedule (if applicable)
Certification Schedule
Cost Classification Report (CMS-2580)
Other Information as Requested in the
BPRs
Notice of Budget Approval 	Contractor 	October 1 and
thereafter as
needed
Activity Summary Certification Schedule
Supplemental Budget Request - See §240
280 - Exhibit of Contractors Auditing and Settlement Reports Form
CMS-1525A
(Rev. 1, 08-30-02)
A1-1268
Click here to view exhibit of Schedule of Net Hours Available, Form CMS-3258.
300 - Exhibit of Audit Selection Criteria Report - Intermediaries Only -
(Rev. 1, 08-30-02)
A1-1270
Reserved for Audit Selection Criteria Report
310 - Completing the Audit Selection Criteria Report (ASCR) - (Rev. 1,
08-30-02)
A1-1271
A. 	General Instructions
Contractor shall use the report to show all the provider cost reports from high to low, by
Medicare dollars at risk. The ASCR will be extracted from the System Tracking for Audit
and Reimbursement (STAR) and submitted to the CMS BPO Bulletin Board 30 days
after the end of the fiscal year, i.e., October 30.
B. 	Specific Instructions
The contractor shall complete the columns on the ASCR as follows:
• 	Provider Number - It shall enter provider's number;
• 	FYE - It shall enter provider's year end;
• 	Provider Type - It shall enter appropriate STAR code and appropriate audit
selection criteria (ASC) code(s);
• 	POA Code - Indicates the designated activity; (P) problem resolution, (O) on-site
review, or (A) audit. A blank indicates desk reviewed only.
• 	Medicare Dollars Claimed - It shall enter the Medicare dollars claimed from the
audited cost report. Use DRG column for DRG and outlier benefit payments. It
shall use pass-through column for PPS pass-through costs, and Cost-Based
column for all other provider costs claimed;
• 	Utilization - It shall enter days or visits, as appropriate, for the total patient
population and for the Medicare population. It shall indicate the percent of
Medicare utilization;
• 	Notice of Amount of Program Reimbursement (NPR) Date - It shall enter date of
NPR; and
• 	Cost Savings/Dissavings - It shall enter the dollar amount of adjustments to
payment as a result of the NPR.
310.1 - Audit Selection Priorities - (Rev. 1, 08-30-02)
A1-1271.1
A. 	General
The contractor shall use the ASCR to decide which providers to audit. This determines
the audit matrix within the BPRs. It shall base audit decisions upon the results (problems
discovered) of its uniform desk review, professional surveys of filed cost reports, and
prior audit/review findings.
B. 	Audit Group
The audit group provides for planning audits/initiatives that must be performed either
because a special circumstance requires immediate audit attention, e.g., termination,
merger, fraud or abuse, new providers, or because of special CMS instructions. The audit
group is defined yearly in the CMS Budget Performance Requirements (BPR guidelines).
Generally, existence of a special circumstance dictates that an audit is necessary.
However, the contractor shall use discretion in this area, especially where there is a short
period cost report from a new provider, a relatively small amount of Medicare payment,
low Medicare utilization, or involvement of OIG or GAO, prohibiting an audit.
310.2 - Level of Audit Effort - (Rev. 1, 08-30-02)
A1-1271.2
Instructions require that the level of audit effort be determined by the results of the desk
review or professional survey process, taking into account the priority, audit cost-to-audit
savings ratio, and the level of budget resources available. In most situations, audits are
limited. However, compliance with the Government Auditing Standards must be
considered in all provider audits.
350 - Instructions for Using the System for Tracking Audit and
Reimbursement (STAR)
(Rev. 128; Issued: 07-13-07; Effective: 10-01-06; Implementation: 08-13-07)
A. 	General
The STAR is an automated system developed for the purpose of tracking the Medicare
cost reporting process. STAR captures historical and current Medicare provider
information for each cost report. The STAR User's Manual serves as the contractor's
instructions for implementing the program functions within the STAR system.
The CMS created the STAR Alert newsletter to clarify instructions in the STAR User's
Manual and the intermediary manual pertaining to output reports created by STAR. The
STAR Alert is issued several times a year and addresses concerns about various audit
issues that may arise during the fiscal year (FY).
B. 	STAR Time System (Not required by the MACs)
• 	All FIs must use the Time System;
• 	The FI enters time spent by employees on a particular administrative function,
e.g., desk reviews, field audits, and settlements, in accordance with the STAR
User's Manual; and
C. 	Required Fields in STAR
The FI completes the following screens, with their corresponding fields, in the STAR
program to ensure that all providers are properly documented in the system and that the
resulting reports and/or records are current and accurate:
1. 	Screen Number 1
Provider Number
Change of Ownership (COO) Code (assigned by system)
Long Name
Short Name
Provider Address
Provider Type
Control Type
Tax Number
Chain Number and Name (If Applicable)
Certification Date
Tie-In Date
Tie-Out date and reason (If Applicable)
Previous FI (if Known)
Transferred to FI (if Known)
Office Codes
2. 	Screen Number 2
Default Address
3. 	Screen Number 3
Interim Payment Pay Method
Periodic Interim Payment In and Out Dates
4. 	Screen Number 4
Cost Report Due
Cost Report Received
Cost Report Rejected
Refiled Cost Report Received
Desk Review Completed
Problem Resolution/Onsite/Audit (POA) Status Code
POA Start
POA Complete
Suspension by CMS
Reason of Suspension
Audit/No Audit Hours
Audit/Travel Hours
Audit/Travel Costs
FI Hearing Start
FI Hearing Complete
Provider Reimbursement Review Board (PRRB) Hearing Start
PRRB Hearing Complete
Tentative Date
Bill Date (If Applicable)
Amount Approved
5. 	Screen Number 5
FY Start (If not a full year)
Fiscal Year End Last Audited
Beds
Appeal Cost
Low/No Utilization
As Filed
Reimbursement Cost (All providers except Home Office (HO))
Total Cost (HO only)
6. 	Screen Number 6
Complete screen with DRGs, pass-thrus, and cost-based amounts for all PPS
hospitals and their excluded units (provider types 05,06, and 08), finalized after
10/1/90. Reopening information is required only if the Notice of Change-Program
Reimbursement (NOC-PR) is within same fiscal year as the original NPR.
7. 	Screen Number 7
PPS/Exempt/Waiver (PEW) Code 1234
Metropolitan Statistical Area (MSA) Area
(9999 if Rural--only Rural codes must be entered)
8. 	Screen 8
Finalized and Reopenings
Patient Days/Visits
Title 18 Days/Visits
Sequestration
Reimbursement Cost (All Providers except HO)
Total Cost (HO only)
Interim Payments
TEFRA Incentive
Notice of Program Reimbursement/Notice of Correction-Program Reimbursement
Reopening Letter Date
Reopening Reason
STAR Time Codes
The STAR Time System is mandated because time recorded in the STAR Time
System for providers is used by CASR, CRS and CPEP programs. Time codes are
stored in each user's lookup.dbf file.
D. 	Required Output Records in STAR
The FI produces the following output records using STAR:
1. 	Hearing and Reopening Log.
Due Upon request from Central Office (CMS).
2. 	Tentative Settlement Logs.
Due upon request from CMS.
3. 	Hearing and Reopening Aging Report.
Due upon request from CMS.
4. 	Cost Report Settlement Log (CRSXXXXX.DBF, where X is the FI's five digit
contractor number).
5. 	PRRB Negative Savings Audit Trail.
Due upon request from CMS.
6. 	Other Files as requested by CMS.
370 - General Principles of Reimbursement for Administrative Costs -
(Rev. 1, 08-30-02)
A1-1100, B1-4100
The principles for determining allowable administrative costs are listed in Part 31 of the
Federal Acquisition Regulation (FAR), as codified in Title 48 of the Code of Federal
Regulations (CFR), along with the contract as interpreted and modified in Appendix B.
Costs will be allocated separately by program management (PM) and Medicare integrity
program (MIP) functions and activities.
Notice is hereby given to all Medicare contractors that on-going operations and projects
should be completed at or under budget. If a contractor exceeds either its PM or its MIP
budget, the U.S. Government will be under no obligation to fund the cost overrun except
in strict accordance with the Medicare contract/agreement. Contractors are required to
provide CMS timely notice of at least 60 days prior to the date funds are exhausted, along
with a fully documented and justified Supplemental Budget Request that provides CMS
time to analyze and recommend action to avoid the projected cost overrun. In your
assessment of when funds will be exhausted, PM and MIP must be evaluated separately.
(See §240.)
380 - Interest Rates In Calculating Debt Due To The Government -
(Rev. 1, 08-30-02)
A1-1110, B1-4110
Notice of interest rates for debts due the government pursuant to Federal debt collection
procedures in the Prompt Payment Act are supplied to contractors by CMS for each rate
period and as published in the "Federal Register." Do not confuse these rates with those
for overpayment or underpayment determinations established under §117 of the Tax
Equity and Fiscal Responsibility Act.
390 - Travel Costs - (Rev. 1, 08-30-02)
A1-1120, B1-4120
Travel costs are generally limited to the rates as set forth in the Federal Travel
Regulations (FTR). See FAR 31.205-46 for complete information, limitations, and
exceptions. The FTR per diem limits from January 1995 to present can be found at the
GSA website: www.policyworks.gov under the Office of Government-wide Policy. Only
the most current mileage rate for use of privately owned automobiles is included on this
website. Mileage rates for prior periods are listed below:
Period 	Rate
September 17, 1989 to June 29, 1991 	24 cents per mile
June 30, 1991 to December 31, 1995 	25 cents per mile
January 1, 1995 to June 6, 1996 	30 cents per mile
June 7, 1996 to January 13, 2000 	31 cents per mile
January 14, 2000 	32 cents per mile
400 - Calculating Return on Investment Where the Contractor's Year
for Insurance Commission Filing Differs from the Medicare Contract
Year - (Rev. 1, 08-30-02)
A1-1130, B1-4130
The contractor shall compute the rate of return on investment in accordance with
Appendix B of the contract/agreement. If the contractor's accounting year is different
from its Medicare contract year, CMS recommends the following weighted average
calculation:
Assumption: 	Rate of return for October 1, 1998, to December 31, 1998, is 10
percent.
Rate of return for January 1, 1999, to September 30, 1999, is 8
percent.
Calculation of weighted average:
10 (Percent) x 3 (months) = 30%
8 (Percent) x 9 (months) = 72%
Total 102%
102% divided by 12 (months) = 8.5% (weighted average)
410 - Cost of Project Exceeds Estimates - (Rev. 1, 08-30-02)
A1-1140
Contractors are expected to complete productivity investment projects at, or under,
budget. In some cases (e.g., large consolidations) it may be appropriate for the regional
office (RO) to negotiate a Memorandum of Advance Agreement that sets out the
statement of work and sets an upper limit for allowable costs.
410.1 - Financial Policies for Coordination of Medicare and Other
Insurance Programs
(Rev. 1, 08-30-02)
440 - Introduction to Financial Policies for Coordination of Medicare
and Other Insurance Programs - (Rev. 1, 08-30-02)
A1-1600, B1-4600
This chapter sets forth the financial policies and principles used by Medicare contractors
furnishing title XVIII claims information for complementary health insurance or Federal
grants-in-aid program purposes and for integrating the Medicare program with these
programs.
450 - Coordination of Medicare and Complementary Insurance
Programs
(Rev. 135; Issued: 01-25-08; Effective: 10-01-07; Implementation: 02-01-08)
The release of title XVIII claims information for complementary health insurance
purposes is permitted (under specified conditions) by Regulation No. 1 (Disclosure of
Official Records and Information). This section establishes financial policies concerning
identification of costs related to the release of this information by the contractor.
Under the national Coordination of Benefits Agreement (COBA) crossover process, a
COBA trading partner must pay the required charges for the release of Medicare claims
information. The Medicare program absorbs charges for supplying duplicate Medicare
Summary Notice (MSN) or billing forms to beneficiaries, their authorized
representatives, and to SSOs. (See Medicare Bill Processing, Chapter 21, Medicare
Summary Notice).
On behalf of CMS, the Coordination of Benefits Contractor now signs national crossover
agreements, known as COBAs, and also invoices, collects, and reconciles fees arising
from the claims that it crosses over to trading partners. The COBC is also tasked with
distributing collected crossover fees to those Medicare contractors whose claims were
successfully transmitted and accepted by the COBA trading partner.
Effective with October 1, 2007, the COBC assumes responsibility for the Medigap claim-
based crossover process. At that time, it also assumes the foregoing responsibilities
associated with invoicing the affected Medigap insurers, collecting the crossover fees
from these entities, and distributing these fees to the affected Medicare contractors.
All Part B contractors, including Medicare Administrative Contractors (MACs), and
Durable Medical Equipment Medicare Administrative Contractors (DMACs) shall
invoice for the last claims files that they transmit to their associated Medigap insurers. In
addition, these affected contractors shall pursue unpaid balances with the Medigap
insurers following the conclusion of the Medigap claim-based crossover transition, which
included clearing all residual Medigap claim-based crossover claims from their payment
floors no later than October 31, 2007.
COBA Financial Management Processes
Contractors were instructed through Transmittal 130 (Change Request [CR] 3614), dated
December 17, 2004, to populate the 837 flat file with a 21-digit unique identifier in the
Beginning of Hierarchical Transaction (BHT03) segment. Transmittal 586 (CR 3906),
dated June 17, 2005, will add an additional digit to that BHT03 segment identifying the
file as Test (T) or Production (P). Contractors shall report only these “production” claims
sent to the COBC to their financial staff along with the unique value populated in the
BHT03 segment, to facilitate reconciliation of reimbursements due to the contractor and
related workload reporting. System reports shall include, at a minimum, formatted data
similar to those developed for the receipt of the COBC Detailed Error Report, created in
Transmittal 474 (CR 3709), dated February 11, 2005. It is possible for a claim to be
crossed over to more than one trading partner. System reports shall reflect those
situations when more than one Coordination of Benefits Agreement Identification
Number (COBA ID) is included in a Common Working File (CWF) response trailer (29).
Contractors shall decrease the number of claims from the reported amount on a particular
BHT03 segment (when the last digit of the segment is a “P”) to their financial staff based
on the receipt of a COBC Detailed Error Report. Contractor financial staff shall not
expect reimbursement for any claims that appear on the error report and shall adjust
financial records (accrued credits) accordingly. If a trading partner receives a paper
claim from a provider before it processes the electronic claim from the COBC, the
trading partner will still have payment responsibility for the claim crossed over by the
COBC. Therefore, the contractor financial staff shall expect payment for such claims.
For COBA IDs that fall in the range for Medicaid claims (70000-77999), contractors
shall not expect payment on these claims, and shall subtract that number of claims from
the amount reported to their contractor financial staff for a particular BHT03 segment
that contains a “P”. There are certain situations in which contractors will not be
reimbursed for production claims that did cross over and did not appear on a COBC
Detailed Error Report. These non-error report adjustments include (1) claims that may be
crossed by both the contractor and the COBC within the first thirty (30) days of
production; (2) write-offs that are approved by CMS; (3) claims that can’t be read by the
trading partner and, therefore, cannot be disputed at the Internal Control Number (ICN)
level; and (4) other as defined by CMS. The non-error report adjustments may or may
not identify the BHT03 number or the ICN, but will include a total count for the
situations listed above. The contractor’s financial contacts will be notified of these
adjustments monthly, no later than the same business day that reimbursements are
received. Contractors shall not expect reimbursement and adjust financial records
(accrued credits) accordingly.
Each contractor’s financial staff shall use the remittance advice accompanying a monthly
deposit, which links a specific BHT03 segment with how many claims were actually
crossed over on that file (and not rejected due to flat file errors, HIPAA validation errors,
trading partner accepted disputes, or non-error report adjustments), to reconcile the
reimbursement received against reimbursement expected for a particular BHT03 value.
Contractors shall not expect any claims that contain a Julian date in the BHT03 segment
that is within two (2) business days of the end of the month to be billed on that month’s
invoice to the trading partner. Those claims will be billed on the following month’s
invoice.
Contractors shall provide CMS with appropriate banking information to facilitate
payment via automatic funds transfer. (NOTE: The remittance advice for
reimbursement will be sent electronically to the contractor’s bank. If the contractor
would prefer a hard copy of the advice, they must request one by sending an e-mail to
COBAProcess@cms.hhs.gov). Contractors shall be responsible for notifying CMS of
any updates to their current banking information by sending an e-mail to
COBAProcess@cms.hhs.gov for the purpose of requesting a telephone call from CMS to
discuss the changes. Contractors will receive reimbursement into one bank account
associated to the contractor number used for Contractor Administrative-Budget and
Financial System (CAFM II) reporting. The contractor shall provide CMS with a list of
all contractor numbers that are combined for reporting purposes to the CAFM II
contractor number. A comparison and variance report is available in CAFM II for
reconciliation purposes. The contractor shall reconcile total credits received and total
accrued credits on the comparison and variance reports monthly.
Contractors shall send initial notification of financial contact information to
COBAProcess@cms.hhs.gov as well as updates to that contact information, as they
occur.
460 - Coordination of Medicare with The Federal Grants-In-Aid
Program (Medicaid)
(Rev. 33, 2-6-04)
A1-1602, B1-4602
The CMS furnishes Medicare billing information to State agencies or their fiscal agents
for Medicaid purposes at no charge to the State or claims submitter. This section
establishes the policy related to transmitting the Medicare billing information to
Medicaid. (See The Medicare Claims Processing Manual, Chapter 22, Medicare
Summary Notices and other Beneficiary Notices for requirements for disclosure.) Once
CMS implements the consolidated claims crossover process, it will furnish Medicare
billing information to State Medicaid agencies (SMAs) through its consolidated claims
crossover contractor, the COBC.
460.1 - Furnishing Title XVIII Claims Information
(Rev. 33, 2-6-04)
A1-1602.1, B1-4602.1
The contractor shall furnish Medicare billing information to Medicaid upon request of the
State agency or its fiscal agents. It shall provide it at no charge to Medicaid as long as the
information can be used in the format given by Medicare:
• 	A copy of the billing/claims form;
• 	A copy of the Medicare Summary Notice;
• 	A copy of the billing form and any attachments thereto; or
• 	Electronic transfer containing the information described in Medicare Claims
Processing Manual, chapter 28.
Where the State has the systems capacity to process data generated in electronic media,
the contractor shall provide the information at no charge. Where the State does not have
the capacity to process electronic data but must use hardcopy, there is no charge for the
information. If, however, the State or its fiscal agent has the capacity to process
electronic data, but requests the information on hardcopy, the contractor shall charge the
State $.30 per claim for the information furnished. The RO has the responsibility of
determining whether the States have the systems capacity.
Some State agencies may want the contractor to furnish the information in a format other
than the standard format described in Medicare Claims Processing Manual, chapter 28. If
the contractor is willing to undertake such additional services for the State, it shall
develop an agreement with the State. It shall include terms by which the State will
reimburse it on a reasonable cost basis for the additional service provided. The cost
includes both direct and indirect costs.
For more details regarding how the crossing over of claims to State Medicaid agencies
will be handled under the COBA process, refer to Pub.100-04, Chapter 28, §70.6
460.2 - Treatment of Administrative Cost of Furnishing Information to
State Agencies
(Rev. 33, 2-6-04)
A1-1602.2, 4602.2
Until CMS consolidates the Medicaid claims crossover process under its Coordination of
Benefits Contractor (COBC), the contractor shall charge the administrative costs incurred
in furnishing billing information for Federal grants-in-aid program purposes, including
the cost of transfer, to the title XVIII program in the appropriate departments.
It shall treat amounts collected from State agencies for information furnished on
hardcopy where the State has the systems capacity to process electronic data as a credit to
Medicare. It shall report this on Form CMS-1523B/1524B in the credit section.
The contractor shall deposit in its regular bank account amounts collected from State
agencies for additional services performed. It shall clearly identify those funds as to
source and purpose to facilitate auditing. The funds must be deposited in the regular bank
account because the cash outlay for the cost of furnishing billing/claims information
comes initially from this account.
460.3 - Cost of a Separate Claims Process - (Rev. 1, 08-30-02)
A1-1602.3, B1-4602.3
Where a State agency selects a Medicare contractor as its agent and a claims process
separate from the Medicare claims process is developed, the cost of all functions
performed in this separate process are a direct charge to the State agency. Arrangements
for billing State agencies for the cost of this claims process are the contractor's
responsibility. When Medicare billing information is transferred to the separate claims
process, the provisions of §460.1 apply.
It is possible that some operations for the separate title XVIII and medical assistance
claims may be performed in the same department, possibly by the same clerk. For
example, upon completion of the title XVIII claim and transfer of billing information, it
may be necessary to return the claim to the files maintenance section to determine
eligibility and status in the medical assistance program. Where common cost centers
exist, it is the contractor's responsibility to identify the effort expended for each program
and charge costs from these costs centers to the appropriate program. The cost includes
both direct and indirect costs.
460.4 - Integrated Claims Processing Systems - (Rev. 1, 08-30-02)
A1-1602.4, B1-4602.4
Where a State agency selects a Medicare contractor as its fiscal agent and the contractor
has an integrated claims processing system, Medicare pays the full cost of operations
which are required for processing title XVIII claims even though the operations benefit
both the title XVIII and State medical assistance programs. Integrated operations
generally include receiving, screening, determination of amount of payment, and portions
of the keypunching and data processing functions. The contractor shall analyze integrated
operations carefully in order to identify any functions that are not required under title
XVIII but have been superimposed on the normal title XVIII claims process. For
example, special coding required by the State agency, additional key punching and data
processing necessary as a result of this coding, preparation of a separate check, and other
similar activities are extra, identifiable functions not required in the title XVIII claims
process and are not reimbursable by Medicare. State agencies are responsible for
administrative costs of all extra, identifiable functions that the contractor performs while
processing combined claims.
The contractor shall furnish a letter of intent to the State agency. It shall clearly indicate
any extra, identifiable functions that are part of integrated operations and are performed
for medical assistance program purposes. It shall indicate any operations separate and
apart from the integrated claims process that are performed solely for the State agency.
The contractor and the State agency are responsible for establishing the terms of the
agreement and the method of reimbursement. When negotiations have been completed,
the contractor shall forward two copies to the servicing RO.
460.5 - Other Services - (Rev. 1, 08-30-02)
A1-1602.5, B1-4602.5
Where the contractor performs any other services for State agencies, which are not
related to the title XVIII claims process, the cost of such services cannot be charged to
title XVIII. The contractor shall identify these services and charge directly for them
where possible. It shall charge the full cost, rather than add-on cost, to the State agency.
The cost includes both direct and indirect costs. It shall have the State agency prepare a
letter of intent with which it clearly defines the services the contractor is to perform and
the method of reimbursement.
470 - Principles for Sharing Costs of Physician Profiles - (Rev. 1, 08-30-
02)
B1-4603
Section 470§§ applies to carriers only.
Carriers are authorized to release physician charge information to other parties under
certain circumstances. The purpose of this section is to establish the policy for the release
of this information.
470.1 - Release of Physician Profile Information to Title XIX Agencies
and to TRICARE Fiscal Intermediaries - (Rev. 1, 08-30-02)
B1-4603.1
Medicare carriers are authorized to release physician charge information to State agencies
that need this data to make medical assistance payments under title XIX, and to
TRICARE fiscal intermediaries for use in administering the Civilian Health and Medical
Program of the Uniformed Services. (See The Medicare General Information, Eligibility
and Entitlement Manual, Chapter 6, for disclosure requirements.)
The State agency and/or TRICARE fiscal intermediary should reach an agreement with
the Medicare carrier on the cost involved prior to furnishing the data. Extra and
identifiable costs associated with the retrieval and transfer of information include such
things as programming, assembling the data, handling, correspondence, files search and
copying. These costs will be charged to the State agency and to TRICARE. (In the Final
Administrative Cost Proposal, notation should be made if information was furnished to
title XIX agencies or the TRICARE fiscal intermediaries and the cost of retrieving and
furnishing the information should be shown.)
A carrier may have an integrated claims process; that is, it may process title XVIII and
title XIX claims concurrently and mutual benefit may be derived from various operations
in the claims process. In such cases, cost allocation is required in accordance with §470.2.
In any case in which determination of the actual cost of disclosing information would
interfere with efficient administration, such cost may be fixed at an amount estimated not
to exceed actual cost. The information may be released after payment of such amount. If
collection costs are disproportionately high or would interfere with efficient
administration, payment of up to $300 per annum may be waived.
470.2 - Principles for Sharing Costs of Physician Profiles When Used for
Medicare and the Carriers' Regular Business - (Rev. 1, 08-30-02)
B1-4603.2
Criteria for the determination of reasonable charges for the Part B program required
carriers to secure and maintain data. These criteria also emphasize that data supporting
the customary charge of the physician are to be obtained from all sources available to the
carrier so that the customary charge will reflect the charge made generally to the
physician's patients for a particular service.
Where several programs or lines of business derive mutual benefits from the use of
physician profile data, the following principle should be observed to assure equitable
distribution of costs:
Where physician profiles established on data derived in whole or in part from the
Medicare program are used by a carrier in any other program or business, cost sharing is
required. The cost chargeable to the Medicare program will be determined by the volume
of Medicare claims processed to the total claims processed for all lines of business using
the physician profile data.
The Secretary and the Secretary's delegated subordinates have a contractual right to
information necessary to insure program continuity and to insure maximum efficiency
and effectiveness. If a change of carriers in an area were to occur, it might be necessary
to transfer to the succeeding carrier appropriate data to assure that no disruption of
reasonable charge determinations would result. Such data would be protected from
unwarranted disclosure under Administration regulations on confidentiality.
480 - Coordination of Medicare and Medicare Supplemental (Medigap)
Health Insurance Policies
(Rev. 38, 04-09-04)
B1-4607
The transfer of title XVIII claims information to Medicare supplemental insurers is
required (under specified conditions) by §1842(h)(3)(B) of the Social Security Act, as
enacted by §4081 of OBRA 87.
• 	The physician or supplier involved must be a participating, physician or supplier,
• 	The beneficiary must assign Medigap benefits to the physician or supplier, and
• 	The policy named by the beneficiary must be a true Medigap policy to the
exclusion of employer coverage and plans operated by labor organizations.
Refer to Section 480.1 Exhibit for a list of Medigap insurers.
Carriers and DMERCs shall continue with claim-based Medigap crossovers until they
receive direction from CMS, via a future instruction, to do otherwise.
480.1 – Exhibits, Medigap Insurers - (Rev. 16, 04-11-03)
Refer to Section 480.1, Exhibits for a list of Medigap insurers.
490 - Establishing a Common Provider Audit Program. - (Rev. 1, 08-30-
02)
A1-1603
The following material (sections 490 through 500) applies to providers on prospective
payment or cost reimbursement.
Title XVIII of the Social Security Act requires that participating health care institutions
(providers) be reimbursed on a reasonable cost basis and to achieve this a comprehensive
provider audit program has been established. Some grant-in-aid programs, namely title V
(the maternal child health services and crippled children's programs) and title XIX
(Medicaid), also require that hospitals and possibly some other providers be reimbursed
on a reasonable cost basis. Other third party payers may also have the same requirement.
The common provider audit program is established to reduce the cost of provider auditing
to participating third party payers and avoid duplicate auditing effort. The purpose then is
to have one audit of a participating provider, which will serve the needs of all
participating programs reimbursing the provider for services rendered.
490.1 - Policies for Implementation of a Common Provider Audit
Program for Titles V, XVIII and XIX of the Social Security Act - (Rev.
1, 08-30-02)
A1-1603.1
Agreement has been reached between the Health Services and Mental Health
Administration, PHS (title V), the Medical Services Administration, SRS (title XIX), and
the Centers for Medicare & Medicaid Services, on basic policy governing the common
audit program. This common audit policy has four basic elements: (a) cost sharing, (b)
desk review, (c) field audit, and (d) final settlement.
490.2 - Cost Sharing - (Rev. 1, 08-30-02)
A1-1603.2
The costs incurred in auditing providers performing services for more than one of the
above programs are to be shared on the basis of the amount of reimbursement (benefits
paid) to individual providers by the respective programs.
Any proposed modification to this method of sharing costs of audit will be evaluated on
the basis of its merits. Alternative methods proposed should adhere to the basic principle
that audit dollars are expended to protect the integrity of benefits paid.
Costs to be shared include all costs incurred from the point of securing the cost report
from the provider through the publishing and distribution of the audit findings (or cost
settlement data where no audit is performed). If final settlement is included in the
common audit program, these costs should also be shared.
There have been some questions concerning the definition of reimbursement (benefits
paid). Reimbursement by the program means the dollar amounts of payments made from
program funds at final settlement and should include payments to providers for inpatient
and outpatient services and, if applicable, combined physician billing.
490.3 - Desk Review - (Rev. 1, 08-30-02)
A1-1603.3
The desk review capability of the intermediary will be used for the principal, intensive
review of the cost reports submitted by the providers. The purpose of the review will be
to determine (l) acceptability of the cost report, (2) need for a field audit, and (3) if an
audit is to be performed, the depth of the audit.
490.4 - Field Audit - (Rev. 1, 08-30-02)
A1-1603.4
The participants shall evaluate the existing field audit capability of intermediary in-house
staff, State audit staff, or a subcontracted audit firm, in regard to their past experience
with the audit capabilities to be used. Every effort should be made to utilize qualified
field audit capability available from the State agencies. CMS expects intermediaries to
avoid the more costly audit firm subcontracts wherever possible.
490.5 - Final Settlement - (Rev. 1, 08-30-02)
A1-1603.5
All participants in the common audit program are to receive copies of the audit findings
or cost settlement data where no audit is performed. The audit workpapers are also to be
available if needed to proceed with settlement. The final settlement may or may not be
undertaken jointly as agreed upon by the parties. Where independent settlements are to be
made, there should be coordination among the participants to review the findings, insure
consistent treatment, and discuss the effects of proposed settlements on each program.
490.6 - Implementing a Common Audit Program - (Rev. 1, 08-30-02)
A1-1603.6
The CMS has contracted with intermediaries to perform certain functions required under
title XVIII. The title V and XIX programs, which use State funds in conjunction with
Federal funds, are administered by the States; therefore, an agreement should be executed
between the intermediaries and the State agencies or their fiscal agents, whoever has the
responsibility for auditing providers under titles V and XIX, to delineate the procedures
to be followed, costs to be shared, method of payment for services, coordination
necessary, and such other items as may be necessary for a complete understanding of
what is expected of each party.
A model agreement (Exhibit l) is furnished as a guide in the preparation of the agreement.
Where the intermediary is also the fiscal agent for the State and responsible for the audit
of providers under title V and/or title XIX, a common audit agreement is still necessary
and should be submitted to CMS for review before being effectuated.
In all cases, two copies of the executed agreement should be forwarded to the CMS
regional office. The regional office will forward one of the copies to the Division of
Contractor Operations so the common audit program can be monitored on a nationwide
basis to assure consistent application of policy.
490.7 - Contacting State Agencies or Their Fiscal Agents - (Rev. 1, 08-
30-02)
A1-1603.7
In those instances where the intermediary is also the State's fiscal agent and responsible
for audit of the providers, there should be no difficulty working out an agreement which
would be acceptable to the State and CMS. Where the intermediary has established
contacts with the State agencies responsible for grants-in-aid programs, the feasibility for
a common audit program should be explored with them. If the intermediary has not
established contact with the State agencies, they should request assistance from their
CMS regional office of their progress toward the establishment of a common audit
program. Multi-State intermediaries should contact the appropriate fiscal specialist in the
CMS central office for assistance and reporting progress.
490.8 - Points to Remember in Discussions with Other Parties - (Rev. 1,
08-30-02)
A1-1603.8
Initially, we anticipate that State agencies will not be familiar with our comprehensive
desk review procedures and suggest that the intermediary arrange to meet with the State
agency to explain the title XVIII procedures. The intermediary should ask the Health
Insurance Regional Office to coordinate such a meeting with the titles V and XIX
Regional Offices.
In those instances where the intermediary is also the State's fiscal agent for one of the
titles other than title XVIII and also has the responsibility for auditing, there will be no
coordination problem. However, where the State agency does its own auditing or uses a
different fiscal agent, the State agency may decide to permit the intermediary to use the
title XVIII guides or they may wish, at least initially, to designate someone to review the
desk review determinations with the intermediary. In any event, the intermediary should
cooperate and attempt to resolve any conflict as to either the necessity or scope of audit
through explanation of the determination made. Note that any audit felt necessary should
benefit all titles in proportion to their share of the costs.
The agreement with the State agencies should specify that either party may request a
special audit of a provider or an abnormal exploration of a particular cost in a routine
audit, so long as the requesting party assumes responsibility for the additional cost.
490.9 - Release of Final Settlement Data for Periods Ending Prior to
January l, 1970 to State Agencies Signing Agreements - (Rev. 1, 08-30-
02)
A1-1603.9
Final settlement data, whether audited or based on the decision to not audit, pertaining to
cost reports for periods ending prior to January l, 1970, with the exception of those
audited cost reports based on combined reporting forms, can be released without charge
to State agencies signing an agreement for a common audit.
It is expected that any cost reports for periods prior to January l, 1970, not yet audited,
will have the title XIX or V information added and the cost reports will then be handled
as a common audit.
490.10 - Release of Final Settlement Data for Periods Ending After
December 31, 1969 to State Agencies Signing Agreements - (Rev. 1, 08-
30-02)
A1-1603.10
Final settlement data for periods ending after December 31, 1969,which contain only title
XVIII information will be released to States signing agreements as follows:
A. Data for final settlement based on comprehensive desk review information only
will be furnished with costs of acquiring and developing the information to be
shared on the basis of reimbursement by the respective programs.
B. Data for final settlement to be based on audited cost information will be furnished
with cost of the field audit only to be shared on the basis of reimbursement by the
respective programs. The desk review data will be included without charge.
490.11 - Treatment of Administrative Costs Accrued in the Operation of
a Common Audit Program - (Rev. 1, 08-30-02)
A1-1603.11
Administrative costs accrued in the operation of a common audit program are to be
shared as indicated in §490.2 above and only that portion of the cost for which Medicare
is responsible should be shown on the Interim Expenditure Report (Form CMS 1527) and
the Final Administrative Cost Proposal (Form CMS 1615).
490.12 - Treatment of Receipts for Final Settlement Data Released to
State Agencies - (Rev. 1, 08-30-02)
A1-1603.12
Amounts collected for furnishing final settlement data under Section 490.10 above are to
be deposited in the intermediary's Medicare bank account. Funds so deposited must be
clearly identified as to source and purpose to facilitate auditing. The funds must be
deposited in the Medicare account because the cash outlay for the cost of obtaining the
information was charged to Medicare. Funds received for this purpose should be shown
as a separate credit item on the Interim Expenditure Report (Form CMS-1527) and the
Final Administrative Cost Proposal (Form CMS 1615).
500 - Coordination of Final Settlement Data Without A Common Audit
Program - (Rev. 1, 08-30-02)
A1-1604
There may be instances where a State agency or their fiscal agents may not find it
feasible to participate in a common audit program, yet desire the title XVIII final
settlement information.
It is recognized that the title XVIII final settlement data (whether it be audited data or
comprehensive desk review data) will not contain all the data required by State agencies
or their fiscal agents to make settlements under their programs. Title XVIII final
settlement information may be released to State agencies or their agents with charges for
the information to be determined as follows:
1. 	Release of final settlement data based on comprehensive desk review only - The
cost of acquiring and developing the information is to be shared on the basis of
reimbursement to the individual provider by the respective programs. Our review
and appraisal reveals that in the comprehensive desk review process little effort is
expended in verifying strictly title XVIII information and that most of the effort
would benefit all programs equally.
2. 	Release of final settlement data based on audited cost information - The cost of
field audit only is to be shared on the basis of reimbursement to the individual
provider by the respective programs. The desk review data will be included
without charge.
500.1 - Treatment of Administrative Costs and Receipts for Furnishing
Settlement Information Where There is No Common Audit Program -
(Rev. 1, 08-30-02)
A1-1604.1
Administrative cost incurred in furnishing settlement information should be charged to
the title XVIII audits of providers' function. Amounts collected for furnishing this
information must be deposited in the intermediary's Medicare bank account. Funds so
deposited must be clearly identified as to source and purpose to facilitate auditing. The
funds must be deposited in the Medicare account because the cash outlay for the cost of
obtaining the information was charged to Medicare. Funds received for this purpose
should be shown as a separate credit item on the Interim Expenditure Report (Form
CMS-1527) and the Final Administrative Cost Proposal (Form CMS-1615).
510 - Reporting Costs for Assistance Provided QIOs - (Rev. 1, 08-30-02)
A3-1610
Section 249F of Public Law 92-603 provides for the establishment of Quality
Improvement Organizations. These organizations require varying amounts of assistance
from intermediaries.
Intermediaries incurring costs in providing assistance to QIOs (including planning,
conditional, and operating) should use the guidelines provided below in reporting costs
on their Estimate of Administrative Costs, Cumulative Interim Expenditure Report and
Budget, and Final Cost Proposals. Funds have not been included in CMS's allocation for
contractor operations to provide assistance to QIOs. Therefore, requests from QIOs for
data as described in B below should not be undertaken until agreement for reimbursement
of costs incurred has been reached with the QIO. It is suggested that this agreement be
included in the Memorandum of Understanding.
Assistance to QIOs will generally fall into two categories:
A. Activities Which Are to be Charged to Medicare
Incidental items will be charged to Medicare on regular lines. Such items include general
discussions on the Memorandum of Understanding, available data, operating procedures,
meetings to discuss specific agenda items, phone calls, etc. Similar items, but involving
more than an incidental amount of time, staff, or cost such as an all day meeting, a series
of meetings to discuss and explain available data, etc., should be identified, reported on
the PRO line and charged to Medicare.
B. Activities Which Are to be Charged to QIOs
This category consists of data requested by the QIO for use in carrying out their function
such as photocopying existing data, special computer runs, and other similar requests for
information. As indicated above, an agreement regarding requests and reimbursement for
costs incurred for completing the requests should be reached in advance and with CMS
RO concurrence, is to be incorporated in a Memorandum of Understanding. The costs for
this type of data are to be billed directly to the QIO and an informational report of the
costs incurred is to be attached to the Medicare fiscal reports to CMS. Costs for this type
of activity are not to be charged to Medicare.
520 - Exhibits - (Rev. 1, 08-30-02)
A1-1699
Exhibit l - Agreement for Common Audit Under Titles X, XVIII and XIX
EXHIBIT l
Agreement for Common Audit Under Titles V, XVIII and XIX
WHEREAS the Secretary of Health, Education and Welfare has the responsibility for the
administration of titles V, XVIII and XIX of the Social Security Act and has urged
coordination of these programs to the extent practicable;
WHEREAS it is required that under titles V, XVIII and XIX participating health care
institutions, hereinafter referred to as providers, are to be reimbursed for inpatient
services on a reasonable cost basis;
WHEREAS representatives of the Social Security Administration, the Medical Services
Administration and the Maternal and Child Health Services of the Department of Health,
Education, and Welfare have agreed that whatever audit of providers is required should
serve the purpose of the three programs;
WHEREAS the (name of intermediary or intermediaries), hereinafter referred to as the
intermediary, has entered into an agreement with the Secretary of Health, Education, and
Welfare to act as the fiscal intermediary under title XVIII, and that the intermediary is
contractually obligated to make such audit of records of providers of services as is
necessary to assure that the facilities are being reimbursed in accordance with the
provisions of the Act and the Regulations promulgated pursuant thereto;
WHEREAS the Secretary has authorized intermediaries and State agencies to enter into
agreements for use of common audit information under titles V, XVIII and XIX and
sharing of such audit costs;
THEREFORE, the intermediary and the (name of State agency or agencies), hereinafter
referred to as the ______________________________________, hereby agree to the
following:
1. 	The intermediary shall have responsibility for performance of desk reviews of
provider cost reports to determine their acceptability and for deciding the need for
and scope of field audits. It is expected that the intermediary will arrange for
appropriate consultation with the (name of State agency or agencies) in arriving at
its decision regarding need for or scope of any audit.
2. 	The intermediary and the (name of State agency or agencies), shall select a
mutually acceptable audit capability to be used in the conduct of field audits,
including the consideration of the intermediary's and the State agency's in-house
audit staff. The intermediary and the (name of State agency or agencies) shall
enter into any subcontracts which might be necessary to accomplish field audits
under the common audit program, in accordance with their responsibilities under
their agreements with the Secretary of Health, Education, and Welfare for
administration of their respective programs. (Administration of subcontracts will
be arranged between the intermediary and State agency.)
3. 	Cost sharing
a. 	The cost of common audits, including desk review, field audit activities,
and, if applicable, final settlement activities, will be shared by the
intermediary and the (State agency or agencies);
b. 	The cost to each party to this agreement will be based upon the ratio of
benefits paid to individual providers by titles V, XVIII, and XIX for the
period covered by the cost report;
c. 	(This provision will set forth the mutually satisfactory arrangements to be
reached whereby each party contributes its share of the audit costs on a
timely basis.)
4. 	This agreement shall begin on (date) and end on (date). It will automatically be
renewed for successive periods of one year unless the intermediary or the State
agency(s) gives written notice of intention not to renew the agreement at least 90
days before the end of the current period.
5. 	Any costs incurred as a result of termination of this agreement will be shared on
an equal basis.
6. 	Final settlement with the providers will be made (by the intermediary for all
parties/or separately). (If separate settlements are to be made, the following
should be added, "Coordination of settlements by the intermediary and the (State
agency or agencies) will be necessary to insure consistent treatment of questioned
items.")
7. 	The provisions of the Agreement shall be applicable only in connection with the
audit of those providers receiving reimbursement under title XVIII and at least
one of the other titles referred to in this agreement.
(Intermediary)
BY: __________________________
(name and title of Intermediary's authorized representative)
(State Agency)
BY :__________________________
(name and title of the authorized State representative)
Transmittals Issued for this Chapter
Rev # 	Issue Date 	Subject 	Impl Date 	CR#
R149FM 	03/27/2009 	Instruction for Credits for Medicare
Administrative /Cntractors on
Complementary Credit Reporting
04/27/2009 	6348
R135FM 	01/25/2008 	Clarification Regarding the
Coordination of Benefits Agreement
(COBA) Medigap Claim-Based
Crossover Process
02/01/2008 	5837
R128FM 	07/13/2007 	Revisions to Instructions on Chapter
1-Budget Preparation-Intermediaries
and Carriers and Chapter 2-Budget
Execution of the Medicare Financial
Management (Pub. 100-06)
08/13/2007 	5682
R114FM 	01/26/2007 	Reporting Requirements for
Crossover Claims Transmitted to the
Coordination of Benefits Contractor
(COBC) Under the Coordination of
Benefits Agreement (COBA) Process
02/26/2007 	5444
R78FM 	09/30/2005 	Coordination of Benefits Agreement
(COBA) Process for Contractor
Financial Staff Notification
10/31/2005 	4016
R62FM 	01/21/2005 	Timeframe for Continued Execution
of Crossover Agreements and
Updated on the Transition to the
National Coordination of Benefits
Agreement (COBA) Program
02/22/2005 	3658
R38FM 	04/09/2004 	Coordination of Medicare and
Complementary Insurance Programs
07/06/2004 	3218
R33FM 	02/06/2004 	Coordination of Medicare and
Complementary Insurance Programs
07/06/2004 	3109
R26FM 	12/08/2003 	Allocation of Overhead and General
and Administrative Costs
01/05/2004 	2885
R23FM 	10/24/2003 	Completing the Budget Distribution
(BD)
11/07/2003 	2876
R01FM 	08/30/2002 	Initial Publication of Chapter 	N/A 	N/A
Back to top of chapter