Federal Register final rules — 1994-01-05

issue-1994-01-05Federal Register final rules — 1994-01-05Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 94-98 Freedom of Information Regulations
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 531-536]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-98]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration

21 CFR Part 20

[Docket No. 92N-0244]

 

Freedom of Information Regulations

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is amending its public 
information regulations to reflect changes already adopted by the 
agency as a result of the 1986 amendments to the Freedom of Information 
Act (the FOIA), executive branch directives, and judicial standards 
governing disclosure of agency records under the FOIA. In practice, FDA 
modified its policies and procedures to comply with these changes as 
they became effective. The regulations are being updated to reflect 
these changes. The agency is also adding clarifying language to certain 
of its public information regulations and making technical changes 
necessary to update citations and cross-references.

DATES: Effective January 5, 1994. Written comments by March 7, 1994. As 
provided in Sec. 10.40(e) (21 CFR 10.40(e)), FDA is providing an 
opportunity for public comment on whether the regulations should 
subsequently be modified or revoked.

ADDRESSES: Submit written comments to the Dockets Management Branch 
(HFA-305), Food and Drug Administration, rm. 1-23, 12420 Parklawn Dr., 
Rockville, MD 20857.

FOR FURTHER INFORMATION CONTACT: Gerald H. Deighton, Freedom of 
Information Staff (HFI-30), Food and Drug Administration, 5600 Fishers 
Lane, Rockville, MD 20857, 301-443-6310.

SUPPLEMENTARY INFORMATION:

I. Background

    FDA's practice and policy under the FOIA have undergone a number of 
changes as a result of legislation, executive directives, and judicial 
precedents over the past years. FDA modified and updated its practices 
and policies to comply with these changes as they became effective. FDA 
is now formally amending its public information regulations to reflect 
changes that were required by law and which have already been put into 
effect. Specifically, FDA is updating its public information 
regulations to reflect provisions of the Omnibus Budget Reconciliation 
Act of 1990 (Pub. L. 101-508), the Freedom of Information Reform Act of 
1986 (Pub. L. 99-570), Executive Order 12600 (June 23, 1987) 
establishing predisclosure notification procedures, guidelines 
promulgated by the Office of Management and Budget (OMB) (52 FR 10012 
at 10018, March 27, 1987), the revised Department of Health and Human 
Services (DHHS) regulations at 45 CFR part 5, and the widely adopted 
District of Columbia (D.C.) Circuit Court of Appeals opinion in Public 
Citizen Health Research Group v. FDA, 704 F.2d 1280 (D.C. Cir. 1983). 
The agency is also adding language to Secs. 20.53 and 20.85 (21 CFR 
20.53 and 20.83) in order to clarify particular aspects of those 
regulations that have been the subject of some confusion. In addition, 
FDA is making technical revisions to certain public information 
regulations to update citations to cross-references that have changed 
since the last revision of part 20 (21 CFR part 20).

II. Procedural Amendments

A. Investigatory Records Compiled for Law Enforcement Purposes

    The language of Sec. 20.64, regarding records compiled for law 
enforcement purposes, is being changed to conform to the 1986 
amendments to the FOIA, which broadened the FOIA exemption 5 U.S.C. 
552(b)(7) that protects certain law enforcement records from mandatory 
public disclosure.

B. Disclosure to Congress

    Section 20.87 is being revised to reflect the provision of the 
Omnibus Budget Reconciliation Act of 1990 that removed the statutory 
barrier that previously prohibited FDA from disclosing certain trade 
secret information to Congress, (Pub. L. 101-508). Section 4755(c)(2) 
of the Omnibus Budget Reconciliation Act of 1990 amended section 301(j) 
of the Federal Food, Drug, and Cosmetic Act (the act) (21 U.S.C. 
331(j)) in order to permit FDA to disclose to Congress certain trade 
secret information that is otherwise prohibited from disclosure except 
to employees of DHHS or to the courts in relevant judicial proceedings. 
Such disclosures to Congress may only be pursuant to a request from the 
Senate, the House of Representatives, any committee or subcommittee 
with jurisdiction over the matter being investigated, or any joint 
committee of Congress or any subcommittee of such joint committee.

C. Trade Secret and Confidential Commercial Information

    Executive Order 12600, issued June 23, 1987, requires Federal 
agencies to establish predisclosure notification procedures in certain 
circumstances before releasing commercial information submitted by 
businesses. FDA has complied with the terms of the Executive Order 
since it became effective, and has followed the procedures adopted by 
DHHS in the regulations published in the Federal Register of November 
25, 1988 (53 FR 47697). To clarify these practices and for the 
convenience of the public, FDA is incorporating DHHS' regulations 
concerning predisclosure notification into FDA's regulations governing 
the disclosure of trade secret and confidential commercial information 
at Sec. 20.61. Accordingly, the standards and procedures promulgated by 
DHHS at 45 CFR 5.65(c), (d), and (e) are being added to FDA's public 
information regulations in Sec. 20.61(d), (e), and (f).
    Section 20.61 also is being amended to reflect the narrow 
definition of ``trade secret'' that was adopted by the D.C. Circuit 
Court of Appeals in Public Citizen Health Research Group v. FDA, 704 
F.2d 1280, 1288 (D.C. Cir. 1983). That definition requires a direct 
relationship between the information being protected and the productive 
process. The definition adopted by the D.C. Circuit in that case has 
become the most widely adopted judicial test for defining trade secret 
information under the FOIA and is already codified in the DHHS FOIA 
regulations at 45 CFR 5.65(a). This amendment to Sec. 20.61 will not 
affect agency practice because FDA has distinguished between trade 
secret and confidential commercial information in accordance with the 
definition in the Public Citizen Health Research Group v. FDA case 
since that case was decided.

D. Fees and Fee Waivers

    Sections 20.42 and 20.43 are being amended to reflect changes 
required by the 1986 amendments to the FOIA concerning fees and fee 
waivers and the OMB guidelines promulgated to implement those changes. 
FDA is adopting the standards and procedures promulgated by DHHS at 45 
CFR 5.41 through 5.45, except that 45 CFR 5.42(g) is excluded from 
Sec. 20.42 because 45 CFR 5.42(g) pertains only to the Social Security 
Administration. In general, the regulations being adopted codify the 
descriptions of categories of requesters, the new fee structure and fee 
limitations, and the revised standards for fee waivers or reductions 
established by the 1986 amendments to the FOIA.
    Section 20.41 is being amended to remove the paragraphs that refer 
to $25 as the amount that triggers a requirement for prepayment of FOIA 
fees. The guidelines promulgated by OMB and the DHHS regulations 
include an advance payment provision for fees that exceed $250. That 
requirement is being included in revised Sec. 20.42.

III. Clarifications

A. Indexing Trade Secrets and Confidential Commercial or Financial 
Information

    A recent report by the General Accounting Office (GAO) criticized 
FDA's regulation concerning Sec. 20.53 Indexing trade secrets and 
confidential or financial information. GAO believed that it would be an 
abrogation of the agency's responsibilities to disclose information in 
those circumstances when a submitter failed to intervene to defend 
against the release of its records. The report hypothesized 
circumstances in which a firm could suffer severe financial loss 
because it could not afford legal representation to defend the 
competitive value of its commercial information.
    Although the regulation has been in effect for almost two decades, 
such a situation has never materialized. The agency continues to 
believe that the burden of defending business related records should be 
borne by the owner and submitter of such information, who is in the 
best position to explain the competitive harm that may result from 
disclosure. A company's unwillingness to take steps to protect the 
information it has submitted to the agency and to index the records at 
issue is ordinarily evidence to FDA that disclosure of the information 
is not likely to cause the submitter substantial competitive harm.
    However, the agency has never and would not at any time abandon its 
responsibilities to protect information that is truly prohibited from 
release. Although the situation has never previously arisen, there may 
be exceptional circumstances that would make it unreasonable for FDA to 
expect a submitter to participate as an intervenor in defending the 
proprietary value of its records. Accordingly, the language of the 
regulation is being amended to clarify that a company's failure to 
intervene to defend the exempt status of its information and to itemize 
and index the disputed records is not treated as an automatic waiver of 
the submitter's interest in protection of the information.

B. Disclosure to Other Federal Agencies

    A 1991 contract report ``FDA Safeguards Against Improper Disclosure 
of Financially Sensitive Information,'' which was undertaken as part of 
the FDA Commissioner's integrity initiative, recommended that FDA 
obtain written pledges of confidentiality when it provides nonpublic 
information to other Federal agencies, such as the Securities Exchange 
Commission (SEC), as part of cooperative law enforcement efforts. FDA's 
regulations governing the disclosure of information to other Federal 
agencies, Sec. 20.85, is intended to require written commitments of 
confidentiality, and staff manual guides and internal agency guidance 
have consistently instructed personnel to obtain such written 
commitments. However, because the 1991 report named above suggested 
some confusion among FDA and other Department and Federal employees, 
FDA is adding the word ``written'' to Sec. 20.85 so that the regulation 
clearly states that such disclosures can only be made pursuant to a 
``written'' agreement.

IV. Technical Changes

    Section 20.100 is being revised to update cross-references that 
have changed because agency regulations have been amended or new 
regulations have been promulgated since the last revision of part 20.
    Because the agency's current practice with respect to disclosure of 
records will not change as a result of any of these amendments, and 
because the amendments set forth in section I. of this document are 
required either by statute, executive branch directives, or judicial 
decisions, FDA finds for good cause under Sec. 10.40(e) that notice and 
public procedure are unnecessary (5 U.S.C. 553(b)(3)(B) and (d)). 
However, under Sec. 10.40(e), FDA is providing an opportunity for 
comment to determine whether the regulations should subsequently be 
modified or revoked.

V. Request for Comments

    Interested persons may, on or before March 7, 1994 submit to the 
Dockets Management Branch (address above) written comments regarding 
this final rule. Two copies of any comments are to be submitted, except 
that individuals may submit one copy. Comments are to be identified 
with the docket number found in brackets in the heading of this 
document. Received comments may be seen in the office above between 9 
a.m. and 4 p.m., Monday through Friday.

VI. Environmental Impact

    The agency has determined under 21 CFR 25.24(a)(8) that this action 
is of a type that does not individually or cumulatively have a 
significant effect on the human environment. Therefore, neither an 
environmental assessment nor an environmental impact statement is 
required.

VII. Economic Impact

    FDA has examined the impacts of the final rule under Executive 
Order 12866 and the Regulatory Flexibility Act. Executive Order 12866 
directs agencies to assess all costs and benefits of available 
regulatory alternatives and, when regulation is necessary, to select 
regulatory approaches that maximize net benefits (including potential 
economic, environmental, public health and safety effects; distributive 
impacts; and equity). The Regulatory Flexibility Act (Pub. L. 96-354) 
requires analyzing options for regulatory relief for small businesses.
    This rule amends the regulations for FDA's practice and policy 
under the FOIA. Because the amendments merely update the regulations to 
reflect procedural changes already adopted by the agency as a result of 
legislation, executive branch directives, or legal precedents, no 
additional impact is anticipated. Accordingly, FDA finds that this 
final rule is not a significant regulatory action as defined by 
Executive Order 12866. In compliance with the Regulatory Flexibility 
Act, the agency certifies that the final rule will not have a 
significant impact on a substantial number of small businesses.

List of Subjects in 21 CFR Part 20

    Confidential business information, Courts, Freedom of information, 
Government employees.

    Therefore, under the Federal Food, Drug, and Cosmetic Act, the 
Public Health Service Act, and the Freedom of Information Act, and 
under the authority delegated to the Commissioner of Food and Drugs, 21 
CFR part 20 is amended as follows:

PART 20--PUBLIC INFORMATION

    1. The authority citation for 21 CFR part 20 continues to read as 
follows:

    Authority: Secs. 201-903 of the Federal Food, Drug, and Cosmetic 
Act (21 U.S.C. 321-393); secs. 301, 302, 303, 307, 310, 311, 351, 
352, 354-360F, 361, 362, 1701-1706, 2101 of the Public Health 
Service Act (42 U.S.C. 241, 242, 242a, 242l, 242n, 243, 262, 263, 
263b-263n, 264, 265, 300u-300u-5, 300aa-1); 5 U.S.C. 552; 18 U.S.C. 
1905.

Sec. 20.41  [Amended]

    2. Section 20.41 Time limitations is amended by removing paragraphs 
(b)(5), (c), and (d).
    3. Section 20.42 is revised to read as follows:

Sec. 20.42  Fees to be charged.

    (a) Categories of requests. Paragraphs (a)(1) through (3) of this 
section state, for each category of request, the type of fees that the 
Food and Drug Administration will generally charge. However, for each 
of these categories, the fees may be limited, waived, or reduced for 
the reasons given in paragraphs (b) and (c) of this section and in 
Sec. 20.43 or for other reasons.
    (1) Commercial use request. If the request is for a commercial use, 
the Food and Drug Administration will charge for the costs of search, 
review, and duplication.
    (2) Educational and scientific institutions and news media. If the 
request is from an educational institution or a noncommercial 
scientific institution, operated primarily for scholarly or scientific 
research, or a representative of the news media, and the request is not 
for a commercial use, the Food and Drug Administration will charge only 
for the duplication of documents. Also, the Food and Drug 
Administration will not charge the copying costs for the first 100 
pages of duplication.
    (3) Other requests. If the request is not the kind described in 
paragraph (a)(1) or (a)(2) of this section, then the Food and Drug 
Administration will charge only for the search and the duplication. 
Also, the Food and Drug Administration will not charge for the first 2 
hours of search time or for the copying costs of the first 100 pages of 
duplication.
    (b) General provisions. (1) The Food and Drug Administration may 
charge search fees even if the records found are exempt from disclosure 
or if no records are found.
    (2) If, under paragraph (a)(3) of this section, there is no charge 
for the first 2 hours of search time, and those 2 hours are spent on a 
computer search, then the 2 free hours are the first 2 hours of the 
operator's own operation. If the operator spends less than 2 hours on 
the search, the total search fees will be reduced by the average hourly 
rate for the operator's time, multiplied by 2.
    (3) If, under paragraph (a)(2) or (a)(3) of this section, there is 
no charge for the first 100 pages of duplication, then those 100 pages 
are the first 100 pages of photocopies of standard size pages, or the 
first 100 pages of computer printout. If this method to calculate the 
fee reduction cannot be used, then the total duplication fee will be 
reduced by the normal charge for photocopying a standard size page, 
multiplied by 100.
    (4) No charge will be made if the costs of routine collection and 
processing of the fee are likely to equal or exceed the amount of the 
fee.
    (5) If it is determined that a requester (acting either alone or 
together with others) is breaking down a single request into a series 
of requests in order to avoid (or reduce) the fees charged, all these 
requests may be aggregated for purposes of calculating the fees 
charged.
    (6) Interest will be charged on unpaid bills beginning on the 31st 
day following the day the bill was sent. Provisions in 45 CFR part 30, 
the Department of Health and Human Services regulations governing 
claims collection, will be used in assessing interest, administrative 
costs, and penalties, and in taking actions to encourage payment.
    (c) Fee schedule. The Food and Drug Administration charges the 
following fees:
    (1) Manual searching for or reviewing of records. When the search 
or review is performed by employees at grade GS-1 through GS-8, an 
hourly rate based on the salary of a GS-5, step 7, employee; when done 
by a GS-9 through GS-14, an hourly rate based on the salary of a GS-12, 
step 4, employee; and when done by a GS-15 or above, an hourly rate 
based on the salary of a GS-15, step 7, employee. In each case, the 
hourly rate will be computed by taking the current hourly rate for the 
specified grade and step, adding 16 percent of that rate to cover 
benefits, and rounding to the nearest whole dollar. As of January 1, 
1993, these rates were $12, $24, and $43 respectively. When a search 
involves employees at more than one of these levels, the Food and Drug 
Administration will charge the rate appropriate for each.
    (2) Computer searching and printing. The actual cost of operating 
the computer plus charges for the time spent by the operator, at the 
rates given in paragraph (c)(1) of this section.
    (3) Photocopying standard size pages. $0.10 per page. Freedom of 
Information Officers may charge lower fees for particular documents 
where:
    (i) The document has already been printed in large numbers;
    (ii) The program office determines that using existing stock to 
answer this request, and any other anticipated Freedom of Information 
requests, will not interfere with program requirements; and
    (iii) The Freedom of Information Officer determines that the lower 
fee is adequate to recover the prorated share of the original printing 
costs.
    (4) Photocopying odd-size documents (such as punchcards or 
blueprints), or reproducing other records (such as tapes). The actual 
costs of operating the machine, plus the actual cost of the materials 
used, plus charges for the time spent by the operator, at the rates 
given in paragraph (c)(1) of this section.
    (5) Certifying that records are true copies. This service is not 
required by the Freedom of Information Act. If the Food and Drug 
Administration agrees to provide certification, there is a $10 charge 
per certification.
    (6) Sending records by express mail, certified mail, or other 
special methods. This service is not required by the Freedom of 
Information Act. If the Food and Drug Administration agrees to provide 
this service, actual costs will be charged.
    (7) Performing any other special service in connection with a 
request to which the Food and Drug Administration has agreed. Actual 
costs of operating any machinery, plus actual cost of any materials 
used, plus charges for the time of the Food and Drug Administration's 
employees, at the rates given in paragraph (c)(1) of this section.
    (d) Procedures for assessing and collecting fees. (1) Agreement to 
pay. The Food and Drug Administration generally assumes that a 
requester is willing to pay the fees charged for services associated 
with the request. The requester may specify a limit on the amount to be 
spent. If it appears that the fees will exceed the limit, the Food and 
Drug Administration will consult the requester to determine whether to 
proceed with the search.
    (2) Advance payment. If a requester has failed to pay previous 
bills in a timely fashion, or if the Food and Drug Administration's 
initial review of the request indicates that the charges will exceed 
$250, the requester will be required to pay past due fees and/or the 
estimated fees, or a deposit, before the search for the requested 
records begins. In such cases, the requester will be notified promptly 
upon receipt of the request, and the administrative time limits 
prescribed in Sec. 20.41 will begin only after there is an agreement 
with the requester over payment of fees, or a decision that fee waiver 
or reduction is appropriate.
    (3) Billing and payment. Ordinarily, the requester will be required 
to pay all fees before the Food and Drug Administration will furnish 
the records. At its discretion, the Food and Drug Administration may 
send the requester a bill along with or following the records. For 
example, the Food and Drug Administration may do this if the requester 
has a history of prompt payment. The Food and Drug Administration may 
also, at its discretion, aggregate the charges for certain time periods 
in order to avoid sending numerous small bills to frequent requesters, 
or to businesses or agents representing requesters. For example, the 
Food and Drug Administration might send a bill to such a requester once 
a month. Fees should be paid in accordance with the instructions 
furnished by the person who responds to the request.
    4. Section 20.43 is revised to read as follows:

Sec. 20.43  Waiver or reduction of fees.

    (a) Standard. The Associate Commissioner for Public Affairs will 
waive or reduce the fees that would otherwise be charged if disclosure 
of the information meets both of the following tests:
    (1) Is in the public interest because it is likely to contribute 
significantly to public understanding of the operations or activities 
of the Government; and
    (2) It is not primarily in the commercial interest of the 
requester. These two tests are explained in paragraphs (b) and (c) of 
this section.
    (b) Public interest. Disclosure of information satisfies the first 
test only if it furthers the specific public interest of being likely 
to contribute significantly to public understanding of Government 
operations or activities, regardless of any other public interest it 
may further. In analyzing this question, the Food and Drug 
Administration will consider the following factors:
    (1) Whether the records to be disclosed pertain to the operations 
or activities of the Federal Government;
    (2) Whether disclosure of the records would reveal any meaningful 
information about Government operations or activities that is not 
already public knowledge;
    (3) Whether disclosure will advance the understanding of the 
general public as distinguished from a narrow segment of interested 
persons. Under this factor, the Food and Drug Administration may 
consider whether the requester is in a position to contribute to public 
understanding. For example, the Food and Drug Administration may 
consider whether the requester has such knowledge or expertise as may 
be necessary to understand the information, and whether the requester's 
intended use of the information would be likely to disseminate the 
information to the public. An unsupported claim to be doing research 
for a book or article does not demonstrate that likelihood, while such 
a claim by a representative of the news media is better evidence; and
    (4) Whether the contribution to public understanding will be a 
significant one, i.e., will the public's understanding of the 
Government's operations be substantially greater as a result of the 
disclosure.
    (c) Not primarily in the requester's commercial interest. If 
disclosure passes the test of furthering the specific public interest 
described in paragraph (b) of this section, the Food and Drug 
Administration will determine whether disclosure also furthers the 
requester's commercial interest and, if so, whether this effect 
outweighs the advancement of that public interest. In applying this 
second test, the Food and Drug Administration will consider the 
following factors:
    (1) Whether disclosure would further a commercial interest of the 
requester, or of someone on whose behalf the requester is acting. 
Commercial interests include interests relating to business, trade, and 
profit. Both profit and nonprofit-making corporations have commercial 
interests, as well as individuals, unions, and other associations. The 
interest of a representative of the news media in using the information 
for news dissemination purposes will not be considered a commercial 
interest.
    (2) If disclosure would further a commercial interest of the 
requester, whether that effect outweighs the advancement of the public 
interest as defined in paragraph (b) of this section.
    (d) Deciding between waiver and reduction. If the disclosure of the 
information requested passes both tests described in paragraphs (b) and 
(c) of this section, the Food and Drug Administration will normally 
waive fees. However, in some cases the Food and Drug Administration may 
decide only to reduce the fees. For example, the Food and Drug 
Administration may do this when disclosure of some but not all of the 
requested records passes the tests.
    (e) Procedure for requesting a waiver or reduction. A requester 
must request a waiver or reduction of fees at the same time as the 
request for records. The requester should explain why a waiver or 
reduction is proper under the factors set forth in paragraphs (a) 
through (d) of this section. Only the Associate Commissioner for Public 
Affairs may make the decision whether to waive or reduce the fees. If 
the Food and Drug Administration does not completely grant the request 
for a waiver or reduction, the denial letter will designate a review 
official. The requester may appeal the denial to that official. The 
appeal letter should address reasons for the Associate Commissioner's 
decision that are set forth in the denial letter.
    5. Section 20.53 is amended by revising the last sentence to read 
as follows:

Sec. 20.53  Indexing trade secrets and confidential commercial or 
financial information.

    * * * If the affected person fails to intervene to defend the 
exempt status of the records and to itemize and index the disputed 
records, the Food and Drug Administration will take this failure into 
consideration in deciding whether that person has waived such exemption 
so as to require the Food and Drug Administration to promptly make the 
records available for public disclosure.
    6. Section 20.61 is amended by revising paragraph (a) and by adding 
new paragraphs (d), (e), and (f) to read as follows:

Sec. 20.61  Trade secrets and commercial or financial information which 
is privileged or confidential.

    (a) A trade secret may consist of any commercially valuable plan, 
formula, process, or device that is used for the making, preparing, 
compounding, or processing of trade commodities and that can be said to 
be the end product of either innovation or substantial effort. There 
must be a direct relationship between the trade secret and the 
productive process.
* * * * *
    (d) A person who submits records to the Government may designate 
part or all of the information in such records as exempt from 
disclosure under exemption 4 of the Freedom of Information Act. The 
person may make this designation either at the time the records are 
submitted to the Government or within a reasonable time thereafter. The 
designation must be in writing. Where a legend is required by a request 
for proposals or request for quotations, pursuant to 48 CFR 352.215-12, 
then that legend is necessary for this purpose. Any such designation 
will expire 10 years after the records were submitted to the 
Government.
    (e) The procedures in this paragraph apply to records on which the 
submitter has designated information as provided in paragraph (d) of 
this section. These procedures also apply to records that were 
submitted to the Food and Drug Administration when the agency has 
substantial reason to believe that information in the records could 
reasonably be considered exempt under exemption 4 of the Freedom of 
Information Act. Certain exceptions to these procedures are set forth 
in paragraph (f) of this section.
    (1) When the Food and Drug Administration receives a request for 
such records and determines that disclosure may be required, the Food 
and Drug Administration will make reasonable efforts to notify the 
submitter about these facts. The notice will include a copy of the 
request, and it will inform the submitter about the procedures and time 
limits for submission and consideration of objections to disclosure. If 
the Food and Drug Administration must notify a large number of 
submitters, notification may be done by posting or publishing a notice 
in a place where the submitters are reasonably likely to become aware 
of it.
    (2) The submitter has 5 working days from receipt of the notice to 
object to disclosure of any part of the records and to state all bases 
for its objections.
    (3) The Food and Drug Administration will give consideration to all 
bases that have been stated in a timely manner by the submitter. If the 
Food and Drug Administration decides to disclose the records, the Food 
and Drug Administration will notify the submitter in writing. This 
notice will briefly explain why the agency did not sustain the 
submitter's objections. The Food and Drug Administration will include 
with the notice a copy of the records about which the submitter 
objected, as the agency proposes to disclose them. The notice will 
state that the Food and Drug Administration intends to disclose the 
records 5 working days after the submitter receives the notice unless a 
U.S. District Court orders the agency not to release them.
    (4) If a requester files suit under the Freedom of Information Act 
to obtain records covered by this paragraph, the Food and Drug 
Administration will promptly notify the submitter.
    (5) Whenever the Food and Drug Administration sends a notice to a 
submitter under paragraph (e)(1) of this section, the Food and Drug 
Administration will notify the requester that the Food and Drug 
Administration is giving the submitter a notice and an opportunity to 
object. Whenever the Food and Drug Administration sends a notice to a 
submitter under paragraph (e)(3) of this section, the Food and Drug 
Administration will notify the requester of this fact.
    (f) The notice requirements in paragraph (e) of this section do not 
apply in the following situations:
    (1) The Food and Drug Administration decided not to disclose the 
records;
    (2) The information has previously been published or made generally 
available;
    (3) Disclosure is required by a regulation issued after notice and 
opportunity for public comment, that specifies narrow categories of 
records that are to be disclosed under the Freedom of Information Act, 
but in this case a submitter may still designate records as described 
in paragraph (d) of this section, and in exceptional cases, the Food 
and Drug Administration may, at its discretion, follow the notice 
procedures in paragraph (e) of this section;
    (4) The information requested has not been designated by the 
submitter as exempt from disclosure when the submitter had an 
opportunity to do so at the time of submission of the information or 
within a reasonable time thereafter, unless the Food and Drug 
Administration has substantial reason to believe that disclosure of the 
information would result in competitive harm; or
    (5) The designation appears to be obviously frivolous, but in this 
case the Food and Drug Administration will still give the submitter the 
written notice required by paragraph (e)(3) of this section (although 
this notice need not explain our decision or include a copy of the 
records), and the Food and Drug Administration will notify the 
requester as described in paragraph (e)(5) of this section.
    7. Section 20.64 is amended by revising the section heading and 
paragraph (a), and by removing the word ``investigatory'' in paragraphs 
(b), (c) introductory text, (d) introductory text, and (e) to read as 
follows:

Sec. 20.64  Records or information compiled for law enforcement 
purposes.

    (a) Records or information compiled for law enforcement purposes 
may be withheld from public disclosure pursuant to the provisions of 
this section to the extent that disclosure of such records or 
information:
    (1) Could reasonably be expected to interfere with enforcement 
proceedings;
    (2) Would deprive a person to a right to a fair trial or an 
impartial adjudication;
    (3) Could reasonably be expected to constitute an unwarranted 
invasion of personal privacy;
    (4) Could reasonably be expected to disclose the identity of a 
confidential source, including a State, local, or foreign agency or 
authority or any private institution which furnished information on a 
confidential basis; and information furnished by a confidential source 
in the case of a record compiled by the Food and Drug Administration or 
any other criminal law enforcement authority in the course of a 
criminal investigation or by an agency conducting a lawful national 
security intelligence investigation;
    (5) Would disclose techniques and procedures for law enforcement 
investigations or prosecutions or would disclose guidelines for law 
enforcement investigations or prosecutions, if such disclosure could 
reasonably be expected to risk circumvention of the law; or
    (6) Could reasonably be expected to endanger the life or physical 
safety of any individual.
* * * * *

Sec. 20.81  [Amended]

    8. Section 20.81 Data and information previously disclosed to the 
public is amended in paragraph (a)(3) by removing the phrase ``part 312 
of this chapter or other''.

Sec. 20.85  [Amended]

    9. Section 20.85 Disclosure to other Federal government departments 
and agencies is amended in the last sentence by removing the words ``an 
agreement'' and adding in their place the words ``a written 
agreement''.
    10. Section 20.87 is amended by revising paragraph (a) to read as 
follows:

Sec. 20.87  Disclosure to Congress.

    (a) All records of the Food and Drug Administration shall be 
disclosed to Congress upon an authorized request.
* * * * *
    11. Section 20.100 is amended by revising paragraphs (c)(7), 
(c)(14), (c)(16), and (c)(17) and by adding new paragraphs (c)(35) 
through (c)(40) to read as follows:

Sec. 20.100  Applicability; cross-reference to other regulations.

* * * * *
    (c) * * *
* * * * *
    (7) Food additive petitions, in Secs. 171.1(h) and 571.1(h) of this 
chapter.
* * * * *
    (14) Investigational new drug notice, in Sec. 312.130 of this 
chapter.
* * * * *
    (16) Master file for a new drug application, in Sec. 312.420 of 
this chapter.
    (17) New drug application file, in Sec. 314.430 of this chapter.
* * * * *
    (35) Premarket approval application, in Sec. 814.9 of this chapter.
    (36) Report of certain adverse experiences with a medical device, 
in Sec. 803.9 of this chapter.
    (37) Disqualification determination of an institutional review 
board, in Sec. 56.122 of this chapter.
    (38) Disqualification determination of a nonclinical laboratory, in 
Sec. 58.213 of this chapter.
    (39) Minutes or records regarding a public advisory committee, in 
Sec. 14.65(c) of this chapter.
    (40) Data submitted regarding persons receiving an implanted 
pacemaker device or lead, in Sec. 805.25 of this chapter.

    Dated: December 23, 1993.
Michael R. Taylor,
Deputy Commissioner for Policy.
[FR Doc. 94-98 Filed 1-4-94; 8:45 am]
BILLING CODE 4160-01-P

Complete official Federal Register PDF

FR Doc. 94-76 Referral of Debts to the Internal Revenue Service for Tax Refund Offset
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 650-651]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-76]

[[Page Unknown]]

[Federal Register: January 5, 1994]

_______________________________________________________________________

Part II

Environmental Protection Agency

_______________________________________________________________________

40 CFR Part 13

Referral of Debts to Internal Revenue Service for Tax Refund Offset; 
Interim Final Rule
ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 13

[FRL-4818-2]

 

Referral of Debts to the Internal Revenue Service for Tax Refund 
Offset

AGENCY: Environmental Protection Agency.

ACTION: Interim rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA), as a participant in 
the Federal Tax Refund Offset Program, is issuing interim regulations 
to govern the referral of delinquent debts to the Internal Revenue 
Service (IRS) for offset against the income tax refunds of persons 
owing money to EPA. These regulations allow EPA to collect debts by 
means of offset from the income tax refunds of persons owing money to 
EPA provided certain conditions are met. This rule establishes 
procedures to be followed by EPA in requesting the IRS to offset tax 
refunds due to taxpayers who have past-due legally enforceable debt 
obligations to the EPA.

DATES: Interim rule is effective on January 5, 1994. Written comments 
must be received on or before March 7, 1994.

ADDRESSES: Send comments to: Stephen B. Hess, Claims and Property Law 
Branch (2376), Office of General Counsel, Environmental Protection 
Agency, 401 M Street, SW., Washington, DC 20460.

FOR FURTHER INFORMATION CONTACT: Stephen B. Hess, Office of General 
Counsel. Telephone 202-260-7512.

SUPPLEMENTARY INFORMATION: This interim rule provides procedures for 
EPA to refer past-due legally enforceable debts to the IRS for offset 
against the income tax refunds of persons owing debts to EPA. This rule 
is authorized by 31 U.S.C. 3720A, the purpose of which is to improve 
the ability of the government to collect money owed it while adding 
certain notice requirements and other protections applicable to the 
government's relationship to the debtor.
    This rule implements 31 U.S.C. 3720A, which directs any Federal 
agency that is owed a past-due legally enforceable debt by a named 
person to notify the Secretary of the Treasury in accordance with 
regulations issued by the Department of the Treasury at 26 CFR 
301.6402-6. Before a Federal agency may give such notice, however, it 
must first:
    (1) Notify the debtor that the agency proposes to refer the debt 
for a tax refund deduction;
    (2) Give the debtor 60 days from the date of the notification to 
present evidence that all or part of the debt is not past-due or 
legally enforceable;
    (3) Consider any evidence presented by the debtor and determine 
whether any amount of such debt is past-due and legally enforceable; 
and
    (4) Satisfy such other conditions as the Secretary of the Treasury 
may prescribe to ensure that the agency's determination is valid and 
that the agency has made reasonable efforts to obtain payment of the 
debt.
    This rule, in accordance with IRS regulations, provides that before 
EPA refers a debt to Treasury (through IRS), a notice of intention 
(Notice of Intent) will be sent to the debtor. This Notice of Intent 
will inform the debtor of the amount of the debt and that unless the 
debt is repaid within 60 days from the date of EPA's Notice of Intent, 
EPA intends to collect the debt by requesting the IRS to offset any tax 
refund payable to the debtor. In addition, the Notice of Intent will 
state that the debtor has a right, during such period, to present 
evidence that all or part of the debt is not past-due or legally 
enforceable. This rule also establishes procedures for the debtor to 
present such evidence.

Executive Order 12866

    Under Executive Order 12866 (58 FR 51735, October 4, 1993) the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to Office of Management and Budget (OMB) review 
and the requirements of the Executive Order. The Order defines 
``significant regulatory action'' as one that is likely to result in a 
rule that may: (1) Have an annual effect on the economy of $100 million 
or more or adversely affect in a material way the economy, a sector of 
the economy, productivity, competition, jobs, the environment, public 
health or safety, or State, local, or tribal governments or 
communities; (2) create a serious inconsistency or otherwise interfere 
with an action taken or planned by another agency; (3) materially alter 
the budgetary impact of entitlements, grants, user fees, or loan 
programs or the rights and obligations of recipients thereof; or (4) 
raise novel legal or policy issues arising out of legal mandates, the 
President's priorities, or the principles set forth in the Executive 
Order.
    It has been determined that this rule is not a ``significant 
regulatory action'' under the terms of Executive Order 12866 and is 
therefore not subject to OMB review.

Regulatory Flexibility Act Certification

    This rule does not have a significant impact on a substantial 
number of small entities (5 U.S.C. 601 et seq.).

Paperwork Reduction Act

    No additional information and record keeping requirements are 
imposed by this rule.

National Environmental Policy Act

    Promulgation of this rule does not represent a major Federal action 
with significant environmental impact. Therefore, preparation of an 
environmental assessment or environmental impact statement under the 
National Environmental Policy Act of 1969, as amended (42 U.S.C. 4321 
et seq.) is not required.

Public Comments

    Pursuant to an agreement between the IRS, the Financial Management 
Service, and EPA regarding EPA's participation in the Tax Refund Offset 
Program for 1994, EPA is required to have promulgated regulations 
regarding referral of debts to IRS for tax refund offset prior to EPA's 
participation in the program. EPA is issuing interim final regulations 
to take effect today in order to fulfill that requirement. Although EPA 
will respond to written comments on today's notice, EPA is not holding 
a hearing, providing an opportunity for prior comments, or delaying the 
effective date because this regulation is mostly procedural and because 
there are no significant issues of law or fact or relevant substantial 
impacts on the Nation or large numbers of persons of which EPA could 
take account consistent with law. Moreover, issuance of immediately 
effective interim final regulations does not prejudice the due process 
rights of debtors and is essential in order for EPA to participate in 
the 1994 program. Written comments are solicited for 60 days after 
publication of this document in the Federal Register. A final document 
discussing any comments received and revisions required will be 
published in the Federal Register as soon as possible after the close 
of the comment period.

Other Matters

    These procedures are being codified in the Agency's regulations 
pursuant to statutory requirements regarding publication of rules of 
procedure in the Federal Register, 5 U.S.C. 552(a)(1)(C). However, the 
procedures described in the rule will be utilized before it becomes 
effective with respect to persons who are provided actual notice of the 
procedures through the notices required under the procedures. See 5 
U.S.C. 552(a)(1).

List of Subjects in 40 CFR Part 13

    Environmental protection, Administrative practice and procedure, 
Claims, Government employees, Income taxes, Wages.

    Dated: December 28, 1993.
Carol M. Browner,
Administrator.

    In consideration of the foregoing, the Environmental Protection 
Agency hereby amends part 13 of title 40 of the Code of Federal 
Regulations as set forth below.

PART 13--[AMENDED]

    1. The authority citation for part 13 is revised to read as 
follows:

    Authority:5 U.S.C. 552a, 5512, and 5514; 31 U.S.C. 3711 et seq. 
and 3720A; 4 CFR parts 101-10.

    2. Subpart H is added to part 13 to read as follows:

Subpart H--Referral of Debts to IRS for Tax Refund Offset

Sec.
13.34  Purpose.
13.35  Applicability and scope.
13.36  Administrative charges.
13.37  Notice requirement before offset.
13.38  Review within the Agency.
13.39  Agency determination.
13.40  Stay of offset.

Supbart H--Referral of Debts to IRS for Tax Refund Offset

Sec. 13.34  Purpose.

    This subpart establishes procedures for the Environmental 
Protection Agency (EPA) to refer past-due debts to the Internal Revenue 
Service (IRS) for offset against the income tax refunds of persons 
owing debts to EPA. It specifies the Agency procedures and the rights 
of the debtor applicable to claims for the payment of debts owed to 
EPA.

Sec. 13.35  Applicability and scope.

    (a) This subpart implements 31 U.S.C. 3720A, which authorizes the 
IRS to reduce a tax refund by the amount of a past-due legally 
enforceable debt owed to the United States.
    (b) For purposes of this section, a past-due legally enforceable 
debt referable to the IRS is a debt which is owed to the United States 
and:
    (1) Except in the case of a judgment debt, has been delinquent for 
at least three months but has not been delinquent for more than ten 
years at the time the offset is made;
    (2) Cannot be currently collected pursuant to the salary offset 
provisions of 5 U.S.C. 5514(a)(1);
    (3) Is ineligible for administrative offset under 31 U.S.C. 3716(a) 
by reason of 31 U.S.C. 3716(c)(2) or cannot be collected by 
administrative offset under 31 U.S.C. 3716(a) by the Agency against 
amounts payable to or on behalf of the debtor by or on behalf of the 
Agency;
    (4) With respect to which EPA has given the taxpayer at least 60 
days from the date of notification to present evidence that all or part 
of the debt is not past-due or not legally enforceable, has considered 
evidence presented by such taxpayer, if any, and has determined that an 
amount of such debt is past-due and legally enforceable;
    (5) Has been disclosed by EPA to a consumer reporting agency as 
authorized by 31 U.S.C. 3711(f), unless a consumer reporting agency 
would be prohibited from using such information by 15 U.S.C. 1681c, or 
unless the amount of the debt does not exceed $100.00;
    (6) With respect to which EPA has notified or has made a reasonable 
attempt to notify the taxpayer that the debt is past-due and, unless 
repaid within 60 days thereafter, the debt will be referred to the IRS 
for offset against any overpayment of tax;
    (7) Is at least $25.00; and
    (8) All other requirements of 31 U.S.C. 3720A and the Department of 
the Treasury regulations at 26 CFR 301.6402-6 relating to the 
eligibility of a debt for tax return offset have been satisfied.

Sec. 13.36  Administrative charges.

    In accordance with Sec. 13.11, all administrative charges incurred 
in connection with the referral of a debt to the IRS shall be assessed 
on the debt and thus increase the amount of the offset.

Sec. 13.37  Notice requirement before offset.

    A request for reduction of an IRS tax refund will be made only 
after EPA makes a determination that an amount is owed and past-due and 
provides the debtor with 60 days written notice. EPA's notice of 
intention to collect by IRS tax refund offset (Notice of Intent) will 
state:
    (a) The amount of the debt;
    (b) That unless the debt is repaid within 60 days from the date of 
EPA's Notice of Intent, EPA intends to collect the debt by requesting 
the IRS to reduce any amounts payable to the debtor as refunds of 
Federal taxes paid by an amount equal to the amount of the debt and all 
accumulated interest and other charges;
    (c) That the debtor has a right to present evidence that all or 
part of the debt is not past-due or not legally enforceable; and
    (d) A mailing address for forwarding any written correspondence and 
a contact name and phone number for any questions.

Sec. 13.38  Review within the Agency.

    (a) Notification by debtor. A debtor who receives a Notice of 
Intent has the right to present evidence that all or part of the debt 
is not past-due or not legally enforceable. To exercise this right, the 
debtor must:
    (1) Send a written request for a review of the evidence to the 
address provided in the notice;
    (2) State in the request the amount disputed and the reasons why 
the debtor believes that the debt is not past-due or is not legally 
enforceable; and
    (3) Include in the request any documents which the debtor wishes to 
be considered or state that additional information will be submitted 
within the remainder of the 60-day period.
    (b) Submission of evidence. The debtor may submit evidence showing 
that all or part of the debt is not past-due or not legally enforceable 
along with the notification required by paragraph (a) of this section. 
Failure to submit the notification and evidence within 60 days will 
result in an automatic referral of the debt to the IRS without further 
action by EPA.
    (c) Review of the evidence. EPA will consider all available 
evidence related to the debt. Within 30 days, if feasible, EPA will 
notify the debtor whether EPA has sustained, amended, or cancelled its 
determination that the debt is past-due and legally enforceable.

Sec. 13.39  Agency determination.

    (a) Following review of the evidence, EPA will issue a written 
decision.
    (b) If EPA either sustains or amends its determination, it shall 
notify the debtor of its intent to refer the debt to the IRS for offset 
against the debtor's Federal income tax refund. If EPA cancels its 
original determination, the debt will not be referred to IRS.

Sec. 13.40  Stay of offset.

    If the debtor timely notifies the EPA that he or she is exercising 
the right described in Sec. 13.38(a) and timely submits evidence in 
accordance with Sec. 13.38(b), any notice to the IRS will be stayed 
until the issuance of a written decision which sustains or amends its 
original determination.

[FR Doc. 94-76 Filed 1-4-94; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 94-74 Asbestos NESHAP Clarification Regarding Analysis of Multi-layered Systems
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Page 542]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-74]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 61

[FRL-4821-7]

 

Asbestos NESHAP Clarification Regarding Analysis of Multi-layered 
Systems

AGENCY: Environmental Protection Agency.

ACTION: Notice of clarification to the final rule.

-----------------------------------------------------------------------

SUMMARY: This document provides clarification regarding the 
requirements of the National Emission Standards for Hazardous Air 
Pollutants (NESHAP) for asbestos. It is intended to address common 
questions regarding situations where one or more layers which may 
contain asbestos are present.

FOR FURTHER INFORMATION CONTACT: Mr. Chris Oh at (703) 308-8732 or Mr. 
Jeffery KenKnight at (703) 308-8728.

SUPPLEMENTARY INFORMATION: On November 20, 1990, the Federal Register 
published the Environmental Protection Agency's (the Agency's) revision 
of the National Emission Standards for Hazardous Air Pollutants for 
Asbestos (asbestos NESHAP), 40 CFR part 61, subpart M, 55 FR 48406. The 
asbestos NESHAP applies to any facility as defined in 40 CFR 61.141. 
The Agency has learned that some of the regulated community have 
questions concerning the analysis of samples which may contain multiple 
layers, any or all of which may be asbestos containing materials (ACM) 
under the asbestos NESHAP. Because these questions are frequently 
asked, EPA is making this clarification.
    This clarification does not supersede, alter, or in any way replace 
the existing asbestos NESHAP. This notice is intended solely as 
guidance and does not represent an action subject to judicial review 
under the section 307(b) of the Clean Air Act or section 704 of the 
Administrative Procedure Act.

I. Clarification of Multi-layered ACM System

    The Environmental Protection Agency has received many questions 
about analyzing multi-layered systems for asbestos content to determine 
the applicability of the asbestos NESHAP. This clarification reiterates 
EPA's position for analysis of multi-layered samples for applicability 
of the asbestos NESHAP.
    In general, when a sample consists of two or more distinct layers 
or materials, each layer should be treated separately and the results 
reported by layer (discrete stratum). Specific examples are given 
below.

Plaster/Stucco Systems

    If plaster and stucco wall or ceiling systems are layered, and the 
layers can be distinguished, then the layers must be analyzed 
separately. Where a plaster or stucco wall system is constructed in 
layers, and the asbestos-containing layer becomes a distinguishable but 
``non-separable'' component of the wall system, the results of the 
analysis of the individual layer(s) may include a small amount of the 
other layers when analyzed (e.g. a skim coat layer may contain a small 
amount of the base coat layer in the analysis of the skim coat layer).

Add-on Materials

    All materials ``added'' to wallboard or other base materials (e.g., 
sprayed-on materials, paint, ceiling or wall texture, etc.) must be 
analyzed separately, if possible. The results of the analysis of those 
individual layers of ``add-on'' material may not be averaged with the 
result of the analysis of wallboard for a composite result, but must be 
analyzed and reported separately. Where a thin coating of one material 
is applied over another material and the materials cannot be separated 
without compromising the layers, the analysis may include a small 
amount of the base layer. If for example, a paint layer containing 
asbestos is spread over a wallboard layer, and the paint layer cannot 
be separated from the wallboard, then a small amount of the wallboard 
layer may be included in the sample of the paint.
    If any of the ``add-on'' materials meet the definition of regulated 
asbestos-containing material (as defined in 40 CFR 61.141), and if at 
least 160 square feet of the material(s) are involved in demolition or 
renovation (whether planned or unplanned during a calendar year), then 
the project would be subject to the asbestos NESHAP.

Joint Compound/Wallboard

    When joint compound and/or tape is applied to wallboard it becomes 
an integral part of the wallboard and in effect becomes one material 
forming a wall system. Therefore, where a demolition or renovation 
impacts such a wall system, a composite analysis of the wall system 
(percent of asbestos in the joint compound, tape and wallboard) should 
be conducted. If the analysis shows an asbestos content of greater than 
one percent and at least 160 square feet of the wall system is involved 
in the demolition or renovation activities (whether planned or 
unplanned, during a calendar year), then the activities would be 
subject to the asbestos NESHAP.

    Dated: December 3, 1993.
John Rasnic,
Director, Stationary Source Compliance Division, Office of Air Quality 
Planning and Standards.
[FR Doc. 94-74 Filed 1-4-94; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 94-45 Standards For Electronic Bulletin Boards Required Under Part 284 of the Commission's Regulations
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 516-531]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-45]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 284

[Docket No. RM93-4-000; Order No. 563]

 

Standards For Electronic Bulletin Boards Required Under Part 284 
of the Commission's Regulations

Issued December 23, 1993.
AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission (Commission) is 
issuing a final rule adopting regulations to standardize the content 
of, and procedures for accessing, information relevant to the 
availability of service on interstate pipelines. The Commission's 
standards will require pipelines to make this information available on 
Electronic Bulletin Boards (EBBs) and through downloadable files and 
will detail procedures and protocols for EBB operation and file 
transfers.

DATES: February 4, 1994. Pipelines must implement the requirements of 
this rule by June 1, 1994, except where the procedures and protocols 
specify otherwise.

ADDRESSES: Federal Energy Regulatory Commission, 825 North Capitol 
Street, NE., Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:

Michael Goldenberg, Office of the General Counsel, Federal Energy 
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
20426, (202) 208-2294.
 Marvin Rosenberg, Office of Economic Policy, Federal Energy Regulatory 
Commission, 825 North Capitol Street, NE., Washington, DC 20426, (202) 
208-1283.
Brooks Carter, Office of Pipeline and Producer Regulation, Federal 
Energy Regulatory Commission, 825 North Capitol Street, NE., 
Washington, DC 20426, (202) 208-0666.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of 
this document in the Federal Register, the Commission also provides all 
interested persons an opportunity to inspect or copy the contents of 
this document during normal business hours in room 3104, 941 North 
Capitol Street NE., Washington DC 20426.
    The Commission Issuance Posting System (CIPS), an electronic 
bulletin board service, provides access to the texts of formal 
documents issued by the Commission. CIPS is available at no charge to 
the user and may be accessed using a personal computer with a modem by 
dialing (202) 208-1397. To access CIPS, set your communications 
software to use 300, 1200, or 2400 bps, full duplex, no parity, 8 data 
bits, and 1 stop bit. CIPS can also be accessed at 9600 bps by dialing 
(202) 208-1781. The full text of this notice will be available on CIPS 
for 30 days from the date of issuance. The complete text on diskette in 
WordPerfect format may also be purchased from the Commission's copy 
contractor, La Dorn Systems Corporation, also located in room 3104, 941 
North Capitol Street, NE., Washington DC 20426.

Table of Contents

I. Introduction
II. Reporting Requirements
III. Background
IV. Summary of the Final Rule
V. Discussion of the Proposed Regulation
    A. Need For A Flexible Mechanism To Make Revisions To The 
Standards And Protocols
    B. Exemptions For Small Pipelines
    C. Implementation Date
    D. Modifications To The Regulatory Provisions
VI. Discussion of Items Included in the Standardized Data Sets and 
Communications Protocols
    A. Standardized Data Sets
    1. Operation of the Data Sets
    2. Date and Time Stamps
    3. Operationally Available Capacity
    4. Disclosure of Minimum Conditions
    B. Communication Protocols
    1. Electronic Data Interchange
    a. ASC X12
    b. ASCII Downloads
    2. Protocols For Communications Software and Hardware, Access 
Requirements, and Log-On Procedures
    C. Common Codes
    1. Introduction
    2. The Proposal
    3. Comments on the Working Group Filing
    4. Commission Adoption of the Working Group Proposal
VII. Issues not Addressed in the Standardized Data Sets and 
Communication Protocols
    A. Proposed Additions To The Standardized Data Sets
    1. Index of Purchasers
    2. Nominations for Firm and Interruptible Capacity
    B. Communication Protocols For Uploading Files and Downloading 
Subsets Of Files
    C. Standardization Of Non-Capacity Release Business Transactions
    D. Policy Issues
    1. Costs of Standardization
    2. Liability
    3. Non-Price Considerations
    E. Gas Industry Standards Board
VIII. Environmental Analysis
IX. Regulatory Flexibility Act Certification
X. Information Collection Requirement
XI. Effective Date
Regulatory Text
Appendix A--Parties Filing Comments On The Notice Of Proposed 
Rulemaking

I. Introduction

    In Order No. 636,1 the Commission created a new operating 
environment for interstate pipelines and shippers on those pipelines by 
requiring pipelines to unbundle the sale of gas from the transportation 
of that gas and by introducing a mechanism permitting shippers to trade 
unneeded capacity through Electronic Bulletin Boards (EBBs) maintained 
by the pipelines. Because shippers will now be transporting gas over 
multiple pipelines, the Commission concluded that the development of 
uniform standards covering the content of, and methods for accessing, 
information relating to transportation would improve the efficiency of 
gas movement across the interstate pipeline grid. To begin the process 
of developing the needed standards, the Commission directed its staff 
to convene a series of informal conferences with all facets of the gas 
industry to consider standards relating to capacity allocation. As a 
result of these conferences, the industry reached consensus agreements 
on the information about available capacity that should be included on 
EBBs and the procedures and protocols for making that information 
available.
---------------------------------------------------------------------------

    \1\Pipeline Service Obligations and Revisions to Regulations 
Governing Self-Implementing Transportation; and Regulation of 
Natural Gas Pipelines After Partial Wellhead Decontrol, 57 FR 13267 
(Apr. 16, 1992), III FERC Stats. & Regs. Preambles 30,939 (Apr. 8, 
1992), order on reh'g, Order No. 636-A, 57 FR 36128 (August 12, 
1992), III FERC Stats. & Regs. Preambles 30,950 (August 3, 1992), 
order on reh'g, Order No. 636-B, 57 FR 57911 (Dec. 8, 1992), 61 FERC 
61,272 (1992), appeal pending sub nom., Atlanta Gas Light Co. and 
Chattanooga Gas Co. v. FERC, No. 92-8782 (11th Cir. Aug. 13, 1992).
---------------------------------------------------------------------------

    The Commission is adopting a final rule reflecting the consensus 
agreements reached by the industry. The rule amends the Commission's 
open access regulations by requiring pipelines to provide standardized 
information about the availability of service on their systems. This 
information will be provided both on the pipelines' EBBs and through 
files which users can download from the pipelines' computers to their 
own computers. The rule further requires pipelines to provide this 
information according to standardized procedures and protocols, which 
will be maintained in a document entitled ``Standardized Data Sets and 
Communication Protocols'' that can be obtained at the Commission. 
Pipelines must implement the requirements of this rule by June 1, 1994.
    The Commission also recognizes the standards and protocols it is 
adopting will need to be updated as more experience with capacity 
release and the transportation environment under Order No. 636 is 
obtained. The Commission, therefore, is proposing to continue the 
industry conferences to consider and propose modifications when needed.

II. Reporting Requirements

    The Commission estimates the public burden for the information 
requirement under this final rule--including the one-time start-up 
burden related to pipeline EBBs--will average 6,770 hours per company. 
The burden estimate includes the time required to review and implement 
the standards, develop the necessary software, search existing data 
sources, gather and maintain the data needed, create/validate common 
and proprietary codes/information and complete and review the 
information. The information/data elements required to be maintained on 
pipeline EBBs will be under a new information requirement, FERC-549(B), 
Gas Pipeline Rates: Capacity Release Information. The annual burden 
associated with the new FERC-549(B) information requirement will be 
528,060 hours based on the estimated initial EBB development burden and 
daily EBB informational updates by an anticipated 78 pipeline 
respondents.
    Included in the annual burden estimate are 40,560 hours (520 hours 
per company) attributable to the creation of common/proprietary codes 
to identify pipelines and common transaction points. The codification 
requirements were not part of the burden estimates contained in the 
Commission's Notice of Proposed Rulemaking (NOPR) issued July 29, 1993.
    Because the final rule contains new information and EBB 
requirements, many of which are one-time start-up activities, it is 
anticipated that FERC-549(B) burden will be reduced by 2,250 hours per 
respondent (for a total reduction of 175,500 hours for all respondents) 
the year following the implementation of the EBB systems.
    Arkla Energy Resources Company and Mississippi River Transmission 
Corporation state that providing comments on the burden estimate in the 
NOPR is difficult until final resolution of EBB issues. Interstate 
Natural Gas Association of American states the burden estimate in the 
NOPR is reasonable for the items included in the proposed rule, but 
would be too low if additional items, such as common codes are 
included. No party has submitted contrary data on a revised burden 
estimate for the requirements proposed in the NOPR. The only 
significant change from the NOPR is the requirement to create a common 
code data base and the Commission has revised its estimate to include 
the additional burden of this effort. Accordingly, the Commission finds 
its burden estimates reasonable.
    Interested persons may send comments regarding these burden 
estimates or any other aspect of this information requirement, 
including suggestions for reductions of the burden, to the Federal 
Energy Regulatory Commission, 941 North Capitol Street, NE., 
Washington, DC 20426 [Attention: Michael Miller, Information Services 
Division, (202) 208-1415, FAX (202) 208-2425]; and to the Office of 
Information and Regulatory Affairs, Office of Management and Budget, 
Washington, DC 20503 [Attention: Desk Officer for Federal Energy 
Regulatory Commission].

III. Background

    In Order No. 636, the Commission required pipelines to establish 
EBBs to provide shippers with equal and timely access to relevant 
information about the availability of service on their systems, 
including service available through capacity release transactions and 
firm and interruptible capacity available directly from the 
pipeline.2 The Commission recognized the efficiency of capacity 
allocation would be enhanced by standardizing both the content of 
capacity release information and the methods by which shippers could 
access that information.3 On February 26, 1993, the Commission 
held a technical conference to examine the industry's efforts in 
standardizing information content and communication procedures. The 
participants at the conference expressed a willingness to establish a 
broad industry-wide working group to reach consensus on standards 
governing capacity release transactions. The Commission subsequently 
established informal conferences with Commission staff and all 
interested members of the gas industry to facilitate the development of 
consensus standards.4
---------------------------------------------------------------------------

    \2\18 CFR 284.8(b)(3)(4), 284.9(3)(4).
    \3\Order No. 636-A, III FERC Stats. & Regs. Preambles at 30,549.
    \4\Notice Of Informal Conferences (March 10, 1993), 54 FR 14530 
(Mar. 18, 1993).
---------------------------------------------------------------------------

    A broad spectrum of firms and organizations participated in these 
Working Groups, including representatives from the major segments of 
the gas industry and other interested parties, such as computer and 
software firms. The participants at the conferences divided their 
efforts into five working groups covering different areas of 
standardization and, on July 1 and July 6, 1993, the Working Groups 
submitted reports on their deliberations. Working Groups 1 and 2 
reached consensus on proposed standardized data sets setting forth the 
information concerning available capacity. Working Group 4 agreed on a 
set of communication protocols governing the dissemination of the 
information. Working Group 5 proposed methods for developing codes to 
identify companies and common transaction points, but had not finalized 
standards in these areas. Working Group 3 reported on its progress in 
considering standards relating to business practices other than 
capacity release, but did not propose any standards. The Working Group 
reports included minority positions on several items. The Commission 
also provided an additional period for the public to comment on the 
Working Group proposals.
    On July 29, 1993, the Commission issued a Notice Of Proposed 
Rulemaking (NOPR) proposing to adopt standards reflecting the consensus 
agreements reached by the industry working groups.5 The NOPR also 
provided for the continuation of the Working Groups and set a number of 
items for further consideration, with reports generally due by February 
1, 1994.6
---------------------------------------------------------------------------

    \5\Notice Of Proposed Rulemaking, 58 FR 41647 (Aug. 5, 1993), IV 
FERC Stats. & Regs. Proposed Regulations 32,500 (July 29, 1993).
    \6\Working Group 5 was given an October 1, 1993 report date for 
its proposal dealing with common transaction point codes.
---------------------------------------------------------------------------

    Forty comments were received on the NOPR.7 In addition, on 
October 12, 1993, Working Group 5 filed its report containing a 
finalized proposal for providing common transaction point codes, and on 
November 3, 1993, Working Groups 1 and 2 filed revisions to the 
proposed capacity availability data sets. The Commission noticed both 
filings and provided the industry with an opportunity to submit 
comments on the filings and to discuss them at an informal 
conference.8
---------------------------------------------------------------------------

    \7\The commenters, and the abbreviations used for each, are 
listed in Appendix A. Con Edison and PSCW filed comments late. The 
Commission will consider these comments.
    \8\AER/MRT, IPAA, Gaslantic, National Registry, NYMEX/EnerSoft, 
Process Gas Consumers Group, and Transco submitted comments on the 
common code proposal. ANR submitted comments on the revised data 
sets.
---------------------------------------------------------------------------

IV. Summary of the Final Rule

    The final rule adopts the regulation and standards as proposed in 
the NOPR, with only slight modifications. The final rule adopts 
Sec. 284.8(b)(5) requiring pipelines to provide standardized 
information relevant to the availability of service on their systems. 
Under the rule, pipelines must provide the standardized information on 
their EBBs and provide users with the ability to download the 
standardized information in compliance with standardized procedures and 
protocols. The rule provides that the details of the required 
information, procedures, and protocols will be made available in a 
document entitled ``Standardized Data Sets and Communication 
Protocols,'' which would be available from the Commission's Public 
Reference and Files Maintenance Branch.9 Because the standardized 
information includes information relevant to the availability of 
interruptible transportation, the rule also revises Sec. 284.9(b)(4), 
which governs interruptible transportation, to cross-reference the 
standardization requirements in Sec. 284.8(b)(5).
---------------------------------------------------------------------------

    \9\This document will not be published in the Federal Register.
---------------------------------------------------------------------------

    In summary, the standardized data sets set forth the information 
concerning capacity availability that pipelines must provide both on 
their on-line EBBs and through downloadable files.10 This 
information includes offers to sell firm capacity (either by the 
pipeline or releasing shippers), bids for capacity, awards of capacity, 
withdrawals of capacity offers and bids, operationally available (i.e., 
interruptible) capacity, and system-wide notices. The protocols 
establish principles and procedures relating to the operation of 
pipeline EBBs and the provision of downloadable files to users. Under 
these protocols, pipelines will provide for file downloads in two 
formats: one that complies with standards for Electronic Data 
Interchange (EDI) promulgated by the American National Standards 
Institute (ANSI) Accredited Standards Committee (ASC) X12 and a second 
format that does not comply with ASC X12, but which provides files in 
standard flat ASCII format.11 The Commission is changing the 
implementation of the regulation from the April 1, 1994 date proposed 
in the NOPR to June 1, 1994, unless the standards and protocols specify 
a different compliance date.12
---------------------------------------------------------------------------

    \1\0On-line EBB refers to a continuous computer connection 
between a pipeline EBB and a user's computer in which the 
information from the pipeline's computer is displayed visually on 
the user's computer and the user can enter data directly to the 
pipeline's computer. File downloading refers to the transfer in 
computerized format of a file from the pipeline's computer to the 
user's computer. The user can use its own internal computer programs 
to manipulate the data.
    \1\1ASCII refers to the American Standard Code for Information 
Interchange, a code for character representation. The Commission 
recognizes the ASC X12 files also use ASCII characters. The 
Commission is using the term ASCII download to refer to standard 
flat file downloads that do not necessarily meet the requirements of 
the ASC X12 standards.
    \1\2The June 1, 1994 date will not apply to the requirement that 
pipelines provide a common code system. The date for implementation 
of this requirement is November 1, 1994.
---------------------------------------------------------------------------

    The comments addressed issues relating to the proposed regulation, 
the standards and protocols that were proposed for inclusion in the 
Standardized Data Sets and Communication Protocols, and the items which 
the Commission proposed not to include in the data sets and protocols. 
The Commission will address the issues raised in each area in turn.

V. Discussion of the Proposed Regulation

A. Need for a Flexible Mechanism To Make Revisions to the Standards and 
Protocols

    In the NOPR, the Commission proposed to proceed through rulemaking, 
rather than a policy statement, finding that the benefits of 
standardization can be achieved only when all pipelines provide the 
same information through the same procedures. The Commission concluded 
a rulemaking was the proper approach to issuing mandatory requirements.
    Several commenters support the Commission's issuance of a rule to 
ensure full compliance, but urge the Commission to commit itself to a 
process for revising the requirements.13 They maintain that once 
the industry obtains experience with capacity release, revisions may be 
needed. Natural supports the use of notice and comment rulemaking, but 
it requests clarification that, even though the referenced document of 
standards and protocols is not contained in the Code of Federal 
Regulations, any modifications to these standards or protocols will be 
made through rulemaking procedures. It maintains changes to this 
document could result in significant administrative burdens and costs 
and, therefore, contends the Administrative Procedure Act (APA) 
requires that such changes be made only through a notice and comment 
rulemaking. O&R and Williston urge the Commission to proceed using a 
policy statement to ensure the utmost flexibility for modifications.
---------------------------------------------------------------------------

    \1\3Power Generators, AGA, Columbia Distribution, Destec Energy, 
FMA, and UDC.
---------------------------------------------------------------------------

    The Commission adheres to its determination to proceed through 
rulemaking to ensure the uniformity standardization requires. 
Nevertheless, the Commission agrees with the commenters that revisions 
and modifications to the standards and protocols will need to be made 
on a regular basis as the industry obtains more experience with 
capacity release transactions and with the changed operating 
environment created by Order No. 636. For example, in the two months 
after issuance of the NOPR, Working Groups 1 and 2 already have 
proposed revisions to the standardized data sets to ensure that they 
function effectively and to clarify a number of items. The Commission 
proposes to continue the informal conferences and the Working Groups as 
the best means for monitoring the performance of the standards and 
proposing needed changes.
    To facilitate the Commission's ability to respond to the need for 
changes, it adopted only a general regulation requiring the pipelines 
to standardize their provision of capacity information, while the 
standards and protocols themselves were to be provided in a separate 
document not contained in the Code of Federal Regulations. The 
Commission is committed to making needed modifications and revisions to 
the standards and protocols as quickly as possible. Determining the 
appropriate mechanism for making such changes is premature, because the 
method should vary depending on the type of change contemplated; 
maintenance of the standards to correct problems or improve their 
functioning should be handled differently than significant substantive 
changes in the means of providing the information.
    In making changes to the data sets and protocols, the Commission 
intends to follow the APA and provide notice and an opportunity for 
comment, just as it has in the past with respect to proposed changes by 
the Working Groups. For example, when Working Groups 1 and 2 submitted 
their recent set of revisions, the Commission noticed the filing and 
provided an opportunity for written comments as well as for 
consideration of the revisions at one of the Commission's EBB 
conferences.
    Although the Commission is issuing the current data sets along with 
this rule, the Commission realizes that as pipelines begin the process 
of correlating the downloadable data sets with the information provided 
by offerors and bidders through their on-line EBBs, difficulties with 
the data sets may be identified. All pipelines immediately must begin 
the correlation process, so they can report any significant 
difficulties to Working Groups 1 and 2. The Commission is committed to 
implementing the data sets by June 1, 1994, and Working Groups 1 and 2, 
therefore, should ensure that they provide the Commission with any 
additional changes they believe are essential in sufficient time to 
permit implementation of the data sets, including ASC X12 
downloadability, by that date. The Commission recognizes that the data 
sets may not be perfect when implemented, but, as discussed above, the 
Commission is committed to a process for revising the data sets on a 
regular basis after implementation.

B. Exemptions for Small Pipelines

    Sabine maintains small pipelines may not be able to comply with the 
requirements outlined in the NOPR. It does not suggest a blanket 
exemption for small pipelines, but instead recommends they be afforded 
an opportunity to demonstrate that the costs of implementing the 
standards would outweigh the benefits of compliance.14
---------------------------------------------------------------------------

    \1\4It points out the Commission exempted it from compliance 
with the interactive EBB requirement in its restructuring order. 
Sabine Pipe Line Company, 63 FERC 61,010 (1993).
---------------------------------------------------------------------------

    The Commission recognizes small pipeline compliance with some of 
the requirements of the standards and protocols may not be cost 
justified or essential to obtain the benefits the Commission sought to 
achieve through standardization. The Commission cannot make a generic 
determination of the particular standards and protocols with which 
small pipelines should not have to comply; compliance with some of the 
standards may not involve as much added cost as compliance with others 
and partial compliance may still be of benefit to users.15 Small 
pipelines desiring an exemption should file a petition under Rule 207 
of the Commission's Rules of Practice and Procedure listing the 
specific requirements for which they seek exemption and explaining why 
the exemption is justified.16 Users will then be given an 
opportunity to comment on the proposed application.
---------------------------------------------------------------------------

    \1\5For example, provision of the data contained in the 
standardized data sets may not be unduly costly and would permit 
users to obtain the same information from all pipelines.
    \1\618 CFR 385.207.
---------------------------------------------------------------------------

C. Implementation Date

    In the NOPR, the Commission proposed an April 1, 1994 
implementation date, finding this date would provide pipelines with 
sufficient time to program their computers to incorporate the changes 
required and would permit final testing of the system during the off-
peak summer season. Many commenters support the April 1, 1994 
implementation date, some suggesting no extension be given.\17\ Peoples 
Gas, et al., and UDC state this date should not result in delay in 
implementing the on-line EBBs already required by Order No. 636. Some 
commenters contend the April 1, 1994 date is sufficient for the items 
included in the NOPR, but would not give sufficient time for 
implementation of additional requirements resulting from the Working 
Groups' February 1, 1994 reports on those items which the Commission 
set for further consideration.\18\ Other commenters contend the April 
1, 1994 date is too ambitious for all items and assert the Commission 
should not set an interim date, but should require full implementation 
by the fall of 1994.\19\ AER/MRT contends an April 1, 1994 
implementation date for the ASC X12 requirement, in particular, is 
unreasonably ambitious.
---------------------------------------------------------------------------

    \17\Power Generators, Con Edison, WEV, Destec Energy, NGSA, 
NYMEX/EnerSoft, O&R, Peoples Gas, et al., UDC, Process Gas Consumers 
Group (noting that capacity release transactions may be heaviest in 
the off-season), Transco (if development of ASC X12 not unduly 
delayed).
    \18\INGAA, Natural.
    \19\AER/MRT, Columbia Gas, Enron, KGPL.
---------------------------------------------------------------------------

    The Commission will agree to delay the implementation date to June 
1, 1994, to allow the Working Groups and the pipelines to make final 
revisions that will improve the functioning of the EBBs and the 
downloadable data sets. But, given this extension, the Commission 
expects the pipelines to have an operational set of standards fully 
implemented by June 1, 1994. At the same time, the June 1, 1994 date 
will permit capacity release transactions, which may be significant in 
the off-peak season, to benefit from the standards. The June 1, 1994 
date applies to the implementation of EDI, but not to the 
implementation of common codes, as discussed later.\20\ The Commission 
clarifies that this date applies only to the items included in this 
rule, not to further items resulting from the February 1, 1994 reports. 
The June 1, 1994 date also does not delay pipelines' compliance with 
the EBB requirements of Order No. 636; pipelines must comply with these 
requirements by the date specified in their restructuring orders.
---------------------------------------------------------------------------

    \20\See text accompanying notes 36 and 51, infra.
---------------------------------------------------------------------------

    The June 1 date is not an interim date, but the final date for 
compliance with these requirements. The reference in the NOPR to final 
testing during the off-peak season meant only that full scale operation 
would operate as the final check to uncover lacunae in operation not 
detected during routine small scale (or beta) testing of the 
system.\21\ As stated earlier, the Commission expects full 
implementation of the data sets and communication protocols by no later 
than the June 1, 1994 date.
---------------------------------------------------------------------------

    \21\By beginning full-scale operation during the summer, the 
standards will be in effect during the period when capacity release 
transactions may be significant, but, at the same time, any final 
problems with the system can be resolved when obtaining gas supplies 
is not as crucial as during the peak winter heating season.
---------------------------------------------------------------------------

    Williston Basin asserts the February 1, 1994 date for the Working 
Group reports is premature since the industry will not have sufficient 
experience with capacity release by then to make additional 
modifications. The Commission is not persuaded to change the February 1 
date for the Working Group reports. These reports are intended to cover 
the items on which the parties did not have the time to reach consensus 
in time for their July reports, but which the Commission found were 
susceptible to resolution given more time. As discussed earlier, the 
Commission is committed to updating these standards when necessary in 
light of experience. The timing of additional meetings or reports to 
consider further revisions are better made at a later point.

D. Modifications to the Regulatory Provisions

    NGSA and Process Gas Consumers Group suggest the rule should be 
revised to require each pipeline to submit a compliance filing 
specifying in its tariff the details of how it will supply the services 
required by the rule. UDC suggests the imposition of reporting 
requirements to permit the Commission and the public to monitor the 
initial operation of EBBs.
    The Commission perceives no need at this point for requiring 
compliance filings by pipelines or the submission of periodic reports. 
The requirements of the rule are straight-forward. The communication 
protocols require pipelines to provide users with scripts detailing the 
procedures for accessing (logging-on to) the pipelines' computer 
systems, and providing further detail through tariff filings seems 
unnecessary. Monitoring of the system can be better accomplished 
through Commission oversight of pipelines' compliance by accessing 
their EBBs and through the use of industry conferences than through 
tariff filings or inflexible periodic reporting requirements.
    Process Gas Consumers Group suggests the deletion of the phrase 
``on its Electronic Bulletin Board'' from the opening clause of the 
rule. It contends this phrase suggests the rule may not cover EDI 
access to data, may not apply to pipelines using third-party vendors to 
provide EBB services, and appears to require pipelines to provide 
information about accessing their EBB solely through their EBB, thereby 
creating a Catch-22 in which shippers can obtain information on how to 
access a pipeline's EBB only by knowing how to access the EBB.
    The Commission will not delete the reference to Electronic Bulletin 
Boards because pipelines must provide the required information on their 
EBBs as well as through downloadable files. The Commission, however, 
will modify the regulation slightly to make even more explicit that 
both modes of communication must be provided. The Commission expects 
pipelines to provide users with instructions for accessing their EBBs 
or using EDI transfers without having the user first access the 
pipelines' EBB.

VI. Discussion of Items Included in the Standardized Data Sets and 
Communication Protocols

    The Commission proposed to set forth the information on capacity 
availability and the protocols governing the dissemination of that 
information in a separate document entitled Standardized Data Sets and 
Communication Protocols that would be available at the Commission. The 
Commission included this document in the NOPR and commenters raised 
issues with respect to the proposed provisions.

A. Standardized Data Sets

1. Operation of the Data Sets
    El Paso requests clarification that a pipeline can leave fields in 
the data sets blank if the pipeline's tariff does not require the 
information to be provided. It cites, as an example, differences in 
pipelines' tariffs as to whether volumetric releases are subject to 
minimum quantity requirements.
    ANR contends the definitions of the terms mandatory and optional, 
as used for some fields in the data sets, are confusing. It submits 
mandatory refers to data fields that every pipeline must support, while 
optional refers to data fields pipelines may offer at their discretion, 
unless their individual tariffs require that those fields be supported. 
If optional means that all pipelines must support the field, thereby 
permitting releasing shippers or bidders with the option of including 
information in the field, ANR asserts it would have to incur added 
expense to redesign its EBB to include these fields.\22\
---------------------------------------------------------------------------

    \22\As an example of the difference in definition, an optional 
field is releaser contract number. Data Set I.1, line 6. Under ANR's 
definition, pipelines would have the discretion to include this 
field. Under the second interpretation, pipelines must provide the 
field so releasing shippers have the ability to include the 
information.
---------------------------------------------------------------------------

    In general, the Commission understands that El Paso's and ANR's 
interpretation of the manner in which the data sets are designed to 
operate accords with the intent of the Working Groups, and the 
Commission agrees with that approach. The Commission, however, sees a 
need to provide further clarification of the operation of the data sets 
and the mandatory and optional characterization of certain fields. At 
the outset, it is important to recognize that these data sets must 
apply to all pipelines, and, therefore, the Working Groups had to 
design them to be flexible enough to accommodate the different 
operational characteristics and information requirements of different 
pipelines. Implementation of the data sets perforce will differ across 
pipelines.
    The data sets are organized along the following lines. First, they 
are divided into generic groups for offers, bids, awards, withdrawals, 
operationally available capacity, and system wide notices. Some of 
these groups are then divided into specialized data sets, for example 
for receipt and delivery point information or for storage releases. 
Each of these subsets contain mandatory, optional, or contingent 
fields.
    All pipelines must support the six broad categories of data sets. 
Pipeline support of the subsets within each category, however, may 
depend on the operational characteristics of individual pipelines.\23\ 
For example, data sets are included for receipt and delivery point 
information and for segment information although not all pipelines are 
segment systems. Pipelines will choose from among the combination of 
these data sets the ones that best present the relevant information for 
their systems.
---------------------------------------------------------------------------

    \23\The easiest example is the storage data sets which obviously 
will not have to be supported by pipelines without storage fields.
---------------------------------------------------------------------------

    All pipelines choosing a particular data set will be required to 
support the mandatory fields in that data set. Pipelines are not 
required by this rule to support the optional fields. Some pipelines, 
however, may be required by their tariffs or other requirements, to 
support some of the optional fields.\24\ Moreover, pipelines must 
display all information, whether mandatory or optional, on their on-
line EBBs. For example, if a pipeline is not now displaying mandatory 
information on its on-line EBB, it must revise its display format to 
accommodate that information.
---------------------------------------------------------------------------

    \24\The contingent fields are filled only when a condition in 
another field is met.
---------------------------------------------------------------------------

    As mentioned earlier, the Working Groups are continuing to make 
refinements in the data sets. In making these refinements, they should 
make a further effort to clarify how pipelines must implement these 
requirements, such as which fields pipelines must support and which are 
optional.
    Enron suggests the standardized data sets should be minimum 
requirements that pipelines can supplement to accommodate tariff 
provisions. As an example, it claims the data sets do not accommodate 
Florida Gas' proposal to permit several shippers temporarily to combine 
their capacity rights to facilitate release transactions.
    The Commission is not sure what flexibility Enron is requesting. 
Pipelines cannot add or delete fields from the capacity data sets 
because standardization requires that all pipelines use the same 
structure for downloading, so shippers can process that information 
using the same computer software. For example, if pipelines could add 
new data fields, shippers' ASC X12 software might be unable to 
interpret the information because the software is keyed to the specific 
fields on the implementation guide. Moreover, the Working Groups 
anticipated the need to accommodate special release offers or unique 
circumstances and included special terms and miscellaneous note fields 
for providing such details.\25\ As discussed previously, the Commission 
recognizes that pipelines may uncover difficulties in correlating their 
information requirements with the downloadable data sets and the 
Commission anticipated possibly having to make corrections to the data 
sets. The best way for pipelines to avoid problems is to begin the 
implementation process immediately so they can report difficulties to 
the Working Groups for resolution prior to implementation.
---------------------------------------------------------------------------

    \25\Enron did not describe the specific problem created by 
combination offers, and the Commission cannot discern why it could 
not be accommodated within the prescribed data sets. For example, 
the combination offer could be assigned a single offer number (Data 
Set I.1, line 3) with any special circumstances described in the 
miscellaneous field (Data Set I.1, line 52).
---------------------------------------------------------------------------

2. Date and Time Stamps
    The proposal put forward by Working Groups 1 and 2 included fields 
identifying the date and time when release offers, bids, withdrawals of 
bids or offers, and capacity awards are posted on pipelines' EBBs. No 
consensus was reached over whether fields should be included to 
identify when pipelines actually received offers, bids, or withdrawals 
or made the determination to award capacity.
    The NOPR proposed to require the inclusion of fields for bid 
receipt date and time, but not for the date and time offers and 
withdrawals were received or capacity awarded. Since releasing shippers 
and pipelines may choose the first come, first served method to break 
ties, the Commission found that routine posting of the bid receipt date 
and time would permit shippers to verify the award of capacity without 
having to contact the pipeline. The Commission did not propose to 
include the date and time fields for receipt of offers and withdrawals 
or capacity awards, concluding this information was not as important to 
capacity release transactions as the bid information. The Commission 
stated, however, that information about the date and time offers and 
withdrawals were received and capacity awards determined must be 
provided by the pipelines upon request.
    Several commenters support the Commission's decision to include 
only the information about bid receipt in the standardized data 
sets.26 Some request clarification as to whether pipelines must 
include both the date and time bids are received and posted as 
mandatory fields.27 Process Gas Consumers Group contends the 
Commission should require inclusion of all the contested items. It 
contends the date and time for receipt of capacity withdrawals is 
particularly important because releasing shippers have only a limited 
right to withdraw offers; it maintains the date and time information is 
needed so bidders can determine whether that right has been exercised 
validly. It contends pipelines easily can make all the contested 
information available in electronic form. The National Registry 
requests that even if pipelines are not required to post information 
concerning the receipt of offers and withdrawals and determination of 
capacity awards, they should be required to provide this information in 
electronic form when requested.
---------------------------------------------------------------------------

    \2\6Power Generators, AER/MRT, Columbia Gas, Enron.
    \2\7KGPL (posting date and time should not be mandatory), NGSA 
(both should be required).
---------------------------------------------------------------------------

    The Commission adheres to its decision not to require pipelines 
routinely to post the receipt date and time for capacity offers and 
withdrawals and the date and time capacity awards are made. The Working 
Groups could not reach agreement on providing the additional 
information, and, as stated in the NOPR, the Commission does not find 
that this information is as crucial to capacity release, or will be 
needed as frequently, as the bid information. The Commission will not 
require pipelines to provide the additional information in electronic 
form, because such a requirement would not be significantly different 
than requiring the routine, electronic posting of this information, 
which the Commission has determined is not necessary. The ability of 
users to obtain the information for offers, withdrawals, and awards 
upon request appears sufficient. The Commission clarifies that both the 
bid receipt and bid posting data fields are mandatory.
    PEC Pipeline Group contends the date and time for bids should be 
the posting time, arguing if receipt date and time is used, the 
information would be unreliable because the bids would not have been 
verified for accuracy. It maintains only the date and time of verified 
bids should be used to break ties.
    The Commission agrees, in principle, that the appropriate 
information to include is the date and time used to break ties. 
However, in most instances, that will be the date and time bids are 
received, not when they are verified. For example, when bids are 
submitted near the end of bidding periods, the pipeline may not verify 
the bids until after the bid window closes. Under a first come, first 
served tie breaking system, capacity would be awarded to the highest 
bid received first in time even if the bid was not verified until 
later.
3. Operationally Available Capacity
    The Commission proposed to adopt the Working Group's consensus 
agreement that pipelines provide information on the amount of 
unscheduled capacity available at specific locations, such as receipt 
and delivery points, mainline, or mainline segments. This field serves 
to identify the capacity that would be available as interruptible 
service from the pipeline. Edison contends this definition would not 
allow shippers to determine whether firm or interruptible capacity is 
available. It suggests operationally available capacity be defined as 
the capacity a firm shipper can nominate at a point, asserting this 
definition would include interruptible capacity that can be displaced 
by a firm shipper. Transco contends the amount of unscheduled capacity 
is proprietary information that would not be provided in the free 
market. Williston Basin does not oppose this requirement, but states 
shippers may be able to use this information only for trend analysis, 
not for making decisions on a daily basis.
    The Commission finds the requirement to provide information on 
operationally available or unscheduled capacity is necessary to comply 
with the requirement that pipelines identify the interruptible capacity 
available on their systems.28 The unscheduled capacity at a point 
reveals the capacity available as interruptible service. In response to 
Edison's comment, the Commission finds that the consensus approach is 
adequate at this point to disclose both the firm and interruptible 
capacity available to potential shippers. The operationally available 
capacity reveals interruptible service and pipelines also are required 
to post the firm service they have available.29 The Working Groups 
still are considering issues relating to operationally available 
capacity, and the Commission will be open to modification of this 
definition if needed.30
---------------------------------------------------------------------------

    \2\8See 18 CFR 284.9(b)(3).
    \2\9See 18 CFR 284.8(b)(3). Pipelines would post this 
information under the capacity offer data set I.1.
    \3\0For example, the Commission is not certain whether Edison 
and Transco principally are concerned with the definition of 
operationally available (or unscheduled) capacity or with the 
different, albeit somewhat related, issue of whether additional 
fields are required to divide scheduled (or nominated) capacity into 
firm and interruptible components. The issue of identifying the firm 
and interruptible components of nominated capacity is still under 
deliberation by the Working Groups, and Edison and Transco will have 
a further opportunity to address these issues in the Working Group 
meetings.
---------------------------------------------------------------------------

    ANR asserts that the data field for operationally available 
capacity should indicate that the data may be estimates. It also 
suggests an additional data field to enable the pipeline to qualify the 
accuracy of any information. The Commission agrees with ANR that the 
information in this field may be estimates and leaves to the Working 
Groups the decision on whether another field is necessary to convey 
information about how the estimates are provided.
    As discussed earlier, NGSA suggested pipelines be required to make 
compliance filings and it submits that these filings include 
information on the locations at which operationally available 
information will be provided, the manner of display, and the timeliness 
of the data. WEV suggests generally that the information provided under 
the data sets be as current as the pipeline can provide. While 
pipelines will not be required to make compliance filings to implement 
this rule, they should provide users with adequate information about 
the locations at which they are reporting the information and the 
timeliness of the information, which should be as current as is 
possible. Since the Commission will have access to the pipelines' EBBs, 
it can monitor the adequacy of the information pipelines provide.
4. Disclosure of Minimum Conditions
    Hadson contends the Commission should eliminate the field providing 
for disclosure of minimum price terms (Data Set I.1, lines 23 and 24). 
It contends disclosure of this information while the market is open 
facilitates collusion among releasing shippers to maintain higher 
prices in a falling market. The Commission will not eliminate this 
field because it comports with the Commission's policy of providing 
releasing shippers with the option of having their minimum conditions 
posted on the EBB.31 This technical proceeding is not the proper 
forum to reexamine the Commission's policy in this regard. The 
Commission notes, however, that, in a free market, sellers can choose 
to disclose minimum price conditions if they find such disclosure 
beneficial. For example, stating a minimum price protects against the 
possibility a deal will fail simply because a buyer submits a bid lower 
than the minimum price even though it is willing to pay the minimum 
price if it had known this condition. Moreover, since minimum price 
terms are public, the Commission can monitor the situation, and 
eliminate this field, if experience shows it does facilitate collusion.
---------------------------------------------------------------------------

    \3\1See El Paso Natural Gas Company, 62 FERC 61,311 at 62,999-4 
(1993). Releasing shippers choosing not to post their minimum 
conditions disclose those conditions only to the pipeline which then 
uses those conditions in evaluating bids.
---------------------------------------------------------------------------

B. Communication Protocols

1. Electronic Data Interchange
    The Commission proposed to adopt the recommendation of Working 
Group 4 by requiring EBB operators32 to provide for electronic 
file downloading of the standardized data sets in compliance with ASC 
X12 EDI standards and an implementation guide to be developed by the 
Gas*Flow group.33 ASC X12 standards provides an electronic data 
submission capability that allows computers to exchange information 
over communication lines using standardized formats. To facilitate 
these transfers, the ASC X12 standards provide standardized transaction 
sets for different types of transactions, such as requests for 
quotations and responses to such requests.34 Since the ASC X12 
transaction sets provide generic data groups applicable to a range of 
potential applications, the transaction sets must be customized to 
individual applications by correlating or ``mapping'' the specific 
information to an ASC X12 transaction set through an implementation 
guide.
---------------------------------------------------------------------------

    \3\2The Commission is adopting Working Group 4's use of the 
phrase ``EBB operator'' in the protocols. An EBB operator is either 
a pipeline or a third-party vendor providing EBB services for a 
pipeline, and pipelines relying on third-party vendors must ensure 
they comply with these standards.
    \3\3Gas*Flow was organized to promote the acceptance of ASC X12 
EDI in the gas industry. It is composed of representatives from the 
gas industry, including local distribution companies, marketers, 
producers, shippers, and pipelines, and operates under guidance from 
the Natural Gas Review Committee.
    \3\4Because the ASC X12 transaction sets have been standardized, 
commercial software and consulting services are available to assist 
users in translating data from standard program files to the 
standardized ASC X12 formats and vice versa.
---------------------------------------------------------------------------

    The Commission anticipated Gas*Flow would be able to receive 
industry input and submit a final implementation guide to the 
Commission within a month after promulgation of the final data sets. 
The Commission also proposed to require file downloads in a flat ASCII 
format in accordance with documentation developed by Gas*Flow, but 
requested comments on whether requiring downloads in ASCII format was 
needed to supplement the downloads in ASC X12 format.35
---------------------------------------------------------------------------

    \3\5The flat ASCII files also could be transmitted 
electronically over communication lines.
---------------------------------------------------------------------------

    a. ASC X12. A few comments address the proposed implementation date 
for ASC X12. Tenneco asserts the April 1, 1994 implementation date 
should not include EDI compliance, because EDI should be implemented 
only when trading partners agree. AER/MRT suggest the date is too 
ambitious for ASC X12 implementation. PEC Pipeline Group maintains ANSI 
must approve the implementation guide developed by Gas*Flow and asserts 
obtaining this approval could affect the timing of ASC X12 
implementation as well as the commitment of ASC X12 software vendors to 
guarantee the use of their software with these data sets. Despite these 
concerns, PEC Pipeline Group is willing to go forward and implement ASC 
X12 based on Gas*Flow's recommendations.
    Working Group 4 found that ANSI approval of the data sets was not 
necessary to go forward with ASC X12 implementation, because the 
information could be mapped to an existing ASC X12 data set.36 
This is the task Gas*Flow will perform. Only one comment suggested that 
the April 1, 1994, date was too ambitious for ASC X12 implementation. 
Since the Commission has now extended the implementation date to June 
1, 1994, EBB operators should have sufficient time to program their 
computer systems to make ASC X12 downloads available by that 
date.37
---------------------------------------------------------------------------

    \3\6Working Group 4 Report at 9.
    \3\7ASC X12 downloads must be made available to any party, 
including a value added network (VAN). A VAN is a communications or 
information system providing an aggregation, routing, and delivery 
service. In effect, a VAN provides a user with an electronic mailbox 
for receiving information.
---------------------------------------------------------------------------

    Tenneco argues no implementation date for ASC X12 be set, 
contending implementation should occur when trading partners agree. As 
the comments suggest, EBB operators need lead time to modify their 
system to incorporate ASC X12 downloads. The Commission, therefore, 
concludes it needs to set a date by which ASC X12 downloads will be 
available to ensure that users wanting this service can obtain it 
expeditiously. As specified by Working Group 4, the details of any 
special arrangements for access to ASC X12 data between the pipeline 
and a trading partner would be worked out between those parties.
    Other commenters address the Commission's proposal to use Gas*Flow 
to prepare the implementation guide. UDC and Tenneco support the use of 
Gas*Flow, but Tenneco suggests the Gas*Flow documentation should be 
submitted to the Working Groups prior to submission to the Commission. 
Columbia Gas believes the Commission's estimate of one month for 
Gas*Flow to prepare the implementation guide is overly optimistic and 
provides too little opportunity for the industry to participate in 
development.
    The Commission expects Gas*Flow to continue its current procedure 
of receiving industry comment on its proposed implementation guide and 
to submit the guide to the Working Groups for their final approval. The 
extension of the implementation date until June 1, 1994, provides 
Gas*Flow with sufficient time to obtain industry input and still 
finalize the implementation guide in time for the industry to meet the 
June 1, 1994 date. Working Groups 1 and 2 and Gas*Flow should 
coordinate their efforts to ensure that any additional revisions made 
by the Working Groups in the data sets are made in sufficient time to 
ensure that EBB operators can implement the ASC X12 downloads by June 
1, 1994. Once the implementation guide is completed, the Commission 
will include the guide with its data sets.
    b. ASCII downloads. A number of commenters contend ASCII downloads 
are not needed to supplement ASC X12.38 They generally argue 
mandating a second download in ASCII format is not worth the increased 
expense and maintain the resources could be better devoted to 
development of ASC X12. They recommend ASCII downloads should remain a 
pipeline option, as proposed by Working Group 4. AER/MRT and Northwest, 
on the other hand, recommend ASCII downloads replace ASC X12, 
contending that ASCII is less costly, and faster and more efficient to 
implement than ASC X12 and that their customers prefer ASCII to ASC 
X12. Others support the Commission's proposal of maintaining ASCII as 
an adjunct to ASC X12 since some users may not have ASC X12 capability 
and ASCII would ensure those users could download the data.39
---------------------------------------------------------------------------

    \3\8Columbia Gas, El Paso (noting software can translate between 
ASCII and ASC X12); Enron, INGAA (ASC X12 is more comprehensive and 
ASCII might not be demanded after ASC X12); National (contending EDI 
software costs only $500), Natural, WEV, and NGSA (customers wanting 
ASCII should have to pay the costs).
    \3\9Brooklyn Union and Process Gas Consumers Group (but noting 
ASCII may be of limited value unless software developers or the 
users themselves develop programs to extract the needed 
information).
---------------------------------------------------------------------------

    The Commission will not substitute ASCII downloads for ASC X12 as 
suggested by Northwest and AER/MRT. Even if ASCII downloads would be 
less expensive to prepare initially, as Northwest and AER/MRT contend, 
the consensus of the industry was to provide for download capability 
using ASC X12 because it provided significant benefits when compared 
with downloads using ASCII format. Some of these benefits include the 
availability of already standardized and well-accepted procedures and 
the concomitant software and businesses available to implement the 
technology. The Commission anticipates that, as ASC X12 is more widely 
used in the gas industry, users will recognize the advantages to using 
ASC X12, as they have in other industries, and it will become the 
industry standard for communication. Nevertheless, to ease the 
transition to ASC X12 for those customers not yet familiar with the ASC 
X12 technology, the Commission will require EBB operators to provide 
for downloading capability in a flat ASCII format as well.
2. Protocols for Communications Software and Hardware, Access 
Requirements, and Log-On Procedures
    Commenters raise questions about the Commission's proposed 
protocols relating to the software and modem speeds used to access 
EBBs, the requirements for obtaining access to EBBs, and the procedures 
and principles for logging-on to computers. Columbia Distribution 
argues the Commission's proposed protocols fail to reflect two 
principles to which the pipelines agreed: the pipelines' recognition of 
the need to develop a mechanism under which users can log-on to 
multiple EBBs with one phone call; and their commitment to work in good 
faith to address other customer concerns, such as log-on procedures, 
additional file transfer options, and other logistical concerns. IPAA 
suggests a standardized basic user interface must be developed, as 
opposed to each pipeline specifying a different communications package.
    Because the statements mentioned by Columbia Distribution reflected 
a goal for future discussions, rather than a consensus on specific 
procedures or principles, the Commission did not include them in its 
current protocols. The Commission recognizes that further 
standardization of access requirements could reduce the burden on users 
which have to access many pipeline EBBs. But Working Group 4 concluded, 
from its review of pipeline EBBs, that adoption of one standard 
communication package for accessing EBBs was made impracticable at this 
time by the proliferation of different hardware and other operating 
considerations used by the various pipeline EBBs.40 Instead, it 
reached consensus on the principle that each EBB operator must provide 
a script detailing its log-on procedures which is compatible with the 
software package used to access the EBB and must provide for file 
downloads through VANs.41 The Commission, therefore, will not 
require further standardization in this area at this time, but will 
leave any such modifications to the continuing Working Group 
deliberations.
---------------------------------------------------------------------------

    \4\0Working Group 4 Report at 6.
    \4\1By using a VAN, a user could have files from multiple 
pipelines delivered to its electronic mailbox, obviating the need to 
log-on to each of the pipelines' EBBs individually.
---------------------------------------------------------------------------

    Columbia Distribution also asserts some pipelines are proposing to 
make electronic contracting mandatory for certain transactions; it 
contends electronic contracting raises legal and business practice 
issues that should be addressed by the Working Groups. Issues regarding 
electronic contracting are legal and policy concerns that have been 
addressed in restructuring or other proceedings42 and are beyond 
the scope of this rulemaking, which focuses on technical issues of how 
to exchange information. The Working Groups have more than enough 
technical issues to consider, and the expertise of these groups lies in 
the technical, not policy, arena.
---------------------------------------------------------------------------

    \4\2See Questar Pipeline Company, 62 FERC 61,192 at 62,307-08, 
aff'd, 64 FERC 61,157 at 62,283-84 (1993); Transcontinental Gas 
Pipe Line Corporation, 65 FERC 61,023 slip op. at 90-93 (1993).
---------------------------------------------------------------------------

    Northwest contends the Commission should not require pipelines to 
support the 2400 baud modem speed because any speed slower than 9600 
baud will place too great a burden on the EBB communication network. It 
recommends each pipeline be able to choose the appropriate modem speed 
so long as it identifies the hardware necessary to access the EBB. 
Working Group 4 reached consensus on the principle that pipelines must 
support a minimum modem speed so all potential users will have 
reasonable access to the EBBs.43 The Commission will not disturb 
the consensus, since Working Group 4's rationale is reasonable and the 
Commission has no data on the impact on user access of permitting 
pipelines to require higher modem speeds.
---------------------------------------------------------------------------

    \4\3Working Group 4 Report at 15.
---------------------------------------------------------------------------

    The Commission recognizes that modem speeds higher than 9600 are in 
use. The Commission is amending the protocols to provide that EBB 
operators supporting such higher modem speeds must comply with the 
recognized national or international standards governing modem 
communication.
    Transco recommends changes to three of the communication protocols. 
First, it argues the Commission should clarify that the requirement for 
24-hour EDI access (protocol ID) is subject to two separate 
contingencies, required periodic maintenance and unpredicted downtime. 
The Commission sees no need to change this language from what was 
proposed by Working Group 4; the possibility of unforseen events 
causing computer problems is well understood and need not be addressed 
separately. Second, Transco contends the Commission's proposed language 
on advance authorization for third-party access to commercially 
sensitive data (protocol IIIA) is unclear because it does not specify 
that the pipeline's customer must provide the authorization.44 The 
Commission agrees that the customer must authorize access to 
commercially sensitive data and will modify this principle accordingly. 
Third, Transco asserts the Commission's proposed language for log-on 
scripts (protocol IVB) does not reflect the principle put forward by 
Working Group 4, because it fails to make clear that the script for 
customized software packages is part of the customized package, not a 
separate software code. The Commission will modify this protocol to 
reflect this principle.
---------------------------------------------------------------------------

    \4\4A pipeline customer might want to authorize an agent to 
obtain commercially sensitive information about the customer, such 
as the customer's nominations, from the EBB.
---------------------------------------------------------------------------

C. Common Codes

1. Introduction
    In the NOPR, the Commission found the post-Order No. 636 business 
environment and the computerization of capacity release transactions 
required the development of common, standardized codes in two areas: 
Codes to identify companies; and common transaction point codes to 
enable shippers to use a single coding structure to identify pipeline 
points, particularly interconnect points between pipelines. Working 
Group 5 had identified, but had not finalized, a process for developing 
both sets of codes. In the NOPR, the Commission stated that it expected 
Working Group 5 to finalize its proposal for common company codes by 
February 1, 1994.
    For common transaction points, Working Group 5 proposed an approach 
in which a third-party (code assignor) would prepare a computerized 
cross-reference table correlating pipelines' proprietary codes (as 
verified and updated by the pipelines) to a common code. Those wanting 
to use the common code would maintain the cross-reference table on 
their computers and could convert proprietary pipeline codes to the 
common code, and vice versa. The Commission was concerned about the 
feasibility of this process, at least in the short term, because 
Working Group 5 had not worked out the details of the approach (such as 
how to select a code assignor, pay for the costs of the initial 
assignment and continued maintenance, or distribute the code) and had 
suggested this process be undertaken by a yet undeveloped gas industry 
standards board. Due to the importance of this issue, the Commission 
gave the Working Group until October 1, 1993, to finalize this approach 
or reach another consensus approach. If no consensus was reached, the 
Commission proposed to select a common code and require the pipelines 
to make the translation to the common code. The Commission requested 
comments on whether it should adopt the PI-GRID code developed by the 
Petroleum Information Corporation or another common code.
    Many commenters support the development of a common code and the 
selection of the PI-GRID code if consensus on an alternative is not 
reached.45 Columbia Distribution and Exxon contend the pipelines, 
not the users, should make the translation. Pipelines contend that 
requiring them to make the translation to the common code would 
increase costs significantly, because it would affect all their 
computer operations, such as those for accounting, scheduling, and 
management, which are based on the use of proprietary codes.46 
They assert Commission selection of the common code could impede the 
cooperative efforts of the industry to date and recommend the 
Commission permit Working Group 5 to continue its efforts.
---------------------------------------------------------------------------

    \4\5Power Generators, NYMEX/EnerSoft, WEV, IPAA, Destec Energy, 
FMA, NGSA, Edison, WEV.
    \4\6Columbia Gas, Enron, INGAA, KGPL, Natural, Transco, Tenneco.
---------------------------------------------------------------------------

    On October 12, 1993, Working Group 5 filed its report which 
detailed its consensus agreement on a code assignor process along the 
lines of its previous proposal. As discussed below, the Commission is 
adopting the Working Group's proposal.
2. The Proposal
    The common code structure proposed by the Working Group would 
consist of two components. The first would be the code number itself, a 
16 digit number, which according to the Working Group, would provide 
the user with some information about each point.47 The second is a 
common code data base consisting of data elements that will be 
associated with each common code. These data elements include such 
information as the name of the point, the owner operator of the point, 
a flow indicator showing the direction of gas flow at the point, and a 
point locator (e.g., geographic coordinates, survey coordinates, or 
line number or mile marker) to be provided when the information is 
available.
---------------------------------------------------------------------------

    \4\7For example, for each non-well facility point, the first two 
numbers indicate the state; the second three, the county; the next 
five a surface location within the state; the next two, the facility 
code; the next two, a sub number identifying components of certain 
types of facilities (e.g., gas plant inlets from tailgates); and the 
final two, a detail number identifying multiple facilities at the 
same location.
---------------------------------------------------------------------------

    Under the proposal, PI-GRID will be the code assignor and will 
provide a copy of the data base to any requestor at a price reflecting 
only its distribution and handling costs. The Working Group also 
proposes that various Code Distributors will enter into agreements with 
PI-GRID to distribute the code. These agreements would provide that the 
Code Distributors would not be able to charge for the data base itself, 
but would be able to charge for other ``value added'' services, such as 
selective extraction of information from the data base.48
---------------------------------------------------------------------------

    \4\8The Working Group envisions a series of contracts, beginning 
with a master agreement between PI-GRID and a consortium of the gas 
industry. If a gas industry standards board eventually is developed, 
it would then take over this contract. PI-GRID would enter into 
contracts based on the master agreement with Code Distributors, and 
the Code Distributors would enter into agreements with users 
specifying the services Distributor will provide.
---------------------------------------------------------------------------

    Based on discussions with PI-GRID, the Working Group anticipates 
six months will be required to establish and validate the common codes 
for a large majority of interstate pipelines. If the industry begins 
the coding process this winter, the Working Group expects the creation 
of a complete common code data base by the 1994-95 winter heating 
season.
    Under the proposal, all business will be transacted with pipelines 
using proprietary codes. Those wanting to use the common code will have 
to program their computers to translate between common and proprietary 
codes to communicate with pipelines. Pipelines will be required to 
verify and validate their proprietary code information to PI-GRID. The 
proposal also provides for ongoing assignment of new transaction points 
and modifications to existing points. The information for these 
revisions must be provided at least ten days before a new or modified 
code goes into effect.
    The Working Group states that, at this point, the demand for common 
codes is unknown; some parties using only one or a small number of 
pipelines may prefer to continue using proprietary codes. Given this 
level of uncertainty, the Working Group contends the code assignor 
process provides a number of benefits compared to a requirement that 
all pipelines adopt a common code. It provides a verified and validated 
common code system to those who need it, while ensuring that the costs 
of using common codes are borne by the users, not those still 
preferring to use proprietary codes. It will provide consistent 
communication between pipelines and customers using proprietary codes, 
avoiding the difficulties that would be created if business 
transactions and other customer contacts employed different coding 
systems. And, it will provide an initial first test of the level of 
demand for, and efficiency of using, a common code. Should a common 
code prove efficient, the Working Group expects the market to evolve to 
the point where common codes will be used for all communications.
3. Comments on the Working Group Filing
    Process Gas Consumers Group and NYMEX/Enersoft raise objections to 
the code assignor process. Process Gas Consumers Group objects to the 
shipper having the responsibility for maintaining a rather large data 
set on its computer and having to develop, or acquire from others, the 
``intelligence'' needed to compare capacity release offers among 
pipelines to identify possible alternative transportation paths.49 
It maintains that the most burdensome task facing pipelines is 
verifying their proprietary codes and that including the common code in 
the capacity release data sets would not be particularly burdensome. It 
emphasizes that including such codes in the data sets would be for 
informational purposes only, and would not require the pipelines to 
conduct business using the common codes.
---------------------------------------------------------------------------

    \4\9It also suggests that a common code system could include 
mile markers or other geographic location information so software 
could identify delivery points either upstream or downstream of a 
location.
---------------------------------------------------------------------------

    NYMEX/EnerSoft contend pipelines should not be able to require 
customers to communicate using proprietary codes, because users will 
then have to obtain translation software to convert the common codes to 
the proprietary codes. It maintains that having the pipelines perform 
the translation is preferable sinc
FR Doc. 94-45 Standards For Electronic Bulletin Boards Required Under Part 284 of the Commission's Regulations
e there are fewer pipelines than 
market participants.
    The other commenters support the code assignor process. AER/MRT 
supports the use of proprietary codes for communication between 
pipelines and users, because use of one code will minimize the 
likelihood of miscommunication. It also argues requiring shippers to 
perform the translation appropriately requires those using common codes 
to bear the costs of that use. Gaslantic contends the Commission should 
ensure that initial and updated common codes are distributed on an 
open-access basis, and IPAA similarly supports the provision of the 
data base without cost.
    The National Registry suggests two clarifications. It is concerned 
about the possibility that PI-GRID, as code assignor, might delay 
distribution of the code in order to degrade the value of services 
provided by competitors. It suggests PI-GRID should be required to file 
a letter with the Commission when it has completed more than 90% of the 
cross-referencing for each pipeline and provide the code to 
distributors at that point. It further contends that information on the 
location of points (such as geographic coordinates or pipeline line 
number of mile marker) is critical, but that the proposed data sets 
requires this information to be included only when available. It 
maintains the Commission should clarify when this information must be 
provided, suggesting it should be supplied for path pipelines, but not 
for point-to-point or network pipelines.50 In line with this 
request, it suggests the Commission require pipelines to include in 
their next Form 567 filing an identification of the proprietary point 
code associated with the points in the flow diagrams.51
---------------------------------------------------------------------------

    \5\0It similarly seeks clarification that available information 
will be validated and become part of the cross-reference table.
    \5\1Form No. 567 is diagram of the operating conditions on the 
pipeline's main transmission system for the prior year. 18 CFR 
260.8.
---------------------------------------------------------------------------

4. Commission Adoption of the Working Group Proposal
    Given the level of support for the code assignor process, the 
Commission accepts the Working Group proposal and will implement it by 
requiring pipelines to provide a mechanism through which any person can 
obtain a validated computerized data base that will provide the ability 
to convert from pipeline proprietary codes to a common code. The 
Working Group stated the code assignment process could be completed by 
the start of the 1994-95 winter heating season, and the Commission, 
therefore, will require the implementation of this approach by November 
1, 1994. The Commission also will require pipelines to ensure that the 
common codes and data base, and any updates, will be provided without 
charge, except for reasonable distribution and handling fees.
    The Commission will adopt the data sets as proposed by the Working 
Group with one modification. The Commission will require that the point 
locator information be mandatory. The Commission agrees with the 
commenters that the ability to locate pipeline points in relation to 
other points on the system is important if users are to use the common 
code data base to determine if a package of released capacity fits 
their needs. When pipelines verify their proprietary codes to PI-GRID, 
they must include information sufficient to enable users to locate a 
point on one pipeline in relation to other points. At this point, the 
pipelines can choose the method of locating the points, such as 
geographic coordinates, line number or line marker, but the Commission 
envisions that eventually all pipelines should move to using geographic 
coordinates so that points on different pipelines can be related to 
each other.
    Gaslantic and IPAA support the provision of the data base and 
updates at no cost to the user. The Working Group report states 
distributors cannot charge more than postage and handling costs for 
providing the code itself, but can charge for value added services. The 
Commission is requiring the pipelines to ensure that users can obtain 
the data base and any updates at a price that reflects only reasonable 
costs of distribution and handling. Additional charges, however, may be 
assessed for other value added services relating to updates.
    The requirement that point locator information be mandatory for all 
pipelines obviates the requests by the National Registry for a further 
definition of the term ``available'' to describe when point locator 
information will be provided and for requiring point location 
disclosure in Form 567 filings. The provision of point locator 
information also should satisfy Process Gas Consumers Group's request 
for geographic location points.
    The National Registry suggests that the Commission require PI-GRID 
to file a statement with the Commission when it has completed more than 
90% of the cross-referencing for each pipeline and provide the code to 
distributors at that point. The Commission has set a deadline for final 
dissemination of the common code data base and finds no reason to 
require filings as the data are compiled or piecemeal implementation.
    NYMEX/Enersoft contend pipelines should be required to conduct 
business using common codes. The Commission will not impose this 
requirement at this time, since it goes beyond the consensus agreement 
reached by Working Group 5. Shippers will be able to use the cross-
reference table to convert electronically from the common codes to the 
proprietary codes for communication with the pipeline.
    Process Gas Consumers Group maintains that including the common 
codes in the capacity release data sets would be more efficient, 
although they do not suggest pipelines be required to conduct business 
using the common code. This suggestion too goes beyond the consensus 
agreement reached by the Working Groups, and the Commission will not 
impose it.
    Moreover, even if the common code (consisting of 16 digits) was 
included in the capacity release data sets, the efficiency of the 
process might not be enhanced to a significant degree. The extensive 
data base that goes along with the common code would not be on the 
EBBs, and users may very well need the underlying data base to provide 
the information they require to perform an analysis of capacity paths. 
As described earlier, the sequence of numbers in the code itself 
provides users only with limited information, such as identifying the 
state and county of the point. But the entire common code data base 
provides additional information about points, such as the point locator 
information, that users may well need to use the common code 
effectively in comparing capacity releases over multiple pipelines. The 
Commission further notes that Working Groups 1 and 2 have included an 
optional field for common codes which pipelines may make available to 
their users. Use of this field may provide a test of whether bidders 
would derive value from access to the common code numbers, without also 
having the underlying data base available.
    In conclusion, the Commission finds that the industry has taken a 
positive step forward by designing a process that will ensure that 
those wanting to use common codes can do so effectively within a 
reasonable period of time. The Commission expects use of this system 
will prove to enhance efficiency by better enabling shippers to manage 
the transportation of gas supplies across the nationwide pipeline grid. 
As pipelines review and update their computer and financial systems in 
light of the changed business environment created by Order No. 636, the 
Commission expects them to incorporate the use of common codes. 
Ultimately, the Commission anticipates that the common codes ultimately 
will become the standard used for all transactions and communications 
between pipelines and their customers.

VII. Issues not Addressed in the Standardized Data Sets and 
Communication Protocols

    The Working Group reports included minority positions on some 
issues, and these issues also were addressed in the comments on the 
Working Group reports. On several issues, the Commission recommended 
that the Working Groups continue their efforts to seek resolution, with 
reports to be made by February 1, 1994. Others involved policy 
questions which the Commission found were beyond the scope of this 
proceeding and would be better examined in other fora.

A. Proposed Additions to the Standardized Data Sets

1. Index of Purchasers
    The National Registry proposed that an Index of Purchasers (Index), 
which would disclose a variety of information about the capacity rights 
of firm capacity holders, be available on EBBs and through downloadable 
files.52 It asserted this index could be used to establish the 
baseline contractual rights of current holders of pipeline capacity, 
information which it believed was needed so potential purchasers could 
determine the releasable rights of firm capacity holders. In the NOPR, 
the Commission did not propose to include the proposed Index because 
the proposal appeared too burdensome and costly. But the Commission 
stated it considered a more limited Index to have value in identifying 
firm shippers with releasable capacity. It suggested the Working Groups 
work on a cost-effective method of presenting such information.
---------------------------------------------------------------------------

    \5\2The Commission requires pipeline tariffs to include an index 
of firm capacity holders, with less detail than what was proposed by 
the National Registry. Tennessee Gas Pipeline Company, 65 FERC 
61,224 slip op. at 182 (1993); 18 CFR 154.41.
---------------------------------------------------------------------------

    Many commenters contend the benefits of an Index do not warrant the 
cost, since shippers willing to release capacity are free to post 
offers to sell and potential purchasers can post so-called want ads, 
advertising the capacity they want to acquire.53 INGAA suggests 
the Commission not prejudge the outcome of this issue, but instead 
permit the Working Group process to determine whether an Index in any 
form is appropriate.
---------------------------------------------------------------------------

    \5\3AER/MRT, Columbia Distribution, Con Edison (if Index is 
adopted, it should be operated independently and funded by 
subscribers), Enron (too costly and burdensome); KGPL, Natural, UDC, 
Williston Basin.
---------------------------------------------------------------------------

    Others contend an Index would be valuable in providing convenient 
access to baseline information on those holding firm service so buyers 
could determine whom to approach to negotiate prearranged deals for 
capacity.54 They contend the Index would replace the index of 
sales customers pipelines previously maintained and should not be 
difficult for pipelines to provide.
---------------------------------------------------------------------------

    \5\4FMA, IPAA, NGSA.
---------------------------------------------------------------------------

    The Commission will not decide this issue now because it is still 
being considered by the Working Groups. But the Commission continues to 
find merit in the concept of providing a cost-effective electronic 
Index of purchasers and expects the participants in the Working Groups 
to consider this issue in the same open-minded and conciliatory manner 
they used to build consensus on other issues in this proceeding.
    The Commission also did not propose to make data items for contract 
number and replacement contract number mandatory fields, finding that 
these items were tied to the proposed Index.\55\ The National Registry 
contends its request to make contract and replacement contract numbers 
mandatory fields is independent of the Index. It asserts these data are 
needed by the Commission, state commissions, and others to create an 
audit trail to verify the ownership of capacity being released and 
acquired.
---------------------------------------------------------------------------

    \55\The releaser's contract number is an optional field and so 
may be included by pipelines when they deem such information to be 
necessary for operation of their systems.
---------------------------------------------------------------------------

    Although the Commission will not require the inclusion of contract 
and replacement contract number in the data sets at this time, it does 
recognize that pipelines will need to maintain a correlation between 
release transactions and the contracts resulting from those 
transactions for Commission audit requirements if not also for the 
pipelines' own purposes. Since pipelines must maintain this information 
in any event, the Working Groups should consider making this 
information mandatory in the downloadable data sets to make access 
easier.
2. Nominations for Firm and Interruptible Capacity
    No consensus was reached in the Working Groups whether to include 
fields showing confirmed firm and interruptible nominations and a field 
showing whether no-notice service is available at a location. 
Proponents of providing this information contended it was needed for 
releasing shippers and bidders to assess the value of released 
capacity, while opponents maintained it is not needed to bid on 
capacity, but would unfairly tilt the market in favor of bidders. The 
parties also disagreed on the availability, and costs, of providing the 
information.
    In the NOPR, the Commission found that the available information 
did not permit it to resolve the issue. Moreover, the Commission 
recognized the Working Groups had little time to consider this matter 
fully and, therefore, strongly encouraged them to continue their 
discussions and to explore alternatives for providing information 
relevant to the purchasing of capacity that is operationally feasible 
to provide at reasonable cost.
    The comments on the NOPR essentially parallel the previous 
positions: proponents state the information is needed to make business 
judgments and is information that would be available in a free 
market;\56\ opponents contend it would undermine capacity release, is 
too costly to provide, would not be provided in a free market, and 
unfairly requires shippers to divulge competitive information that 
would be used against them.\57\ NGSA and Destec Energy comment that the 
Commission must be prepared to judge the merits of disputes, like this 
one, which are based on competing economic interests. FMA asserts that 
for unresolved disputes, special consideration should be given to the 
views of end-users, because they are the ones paying for natural gas 
and transportation.
---------------------------------------------------------------------------

    \56\Power Generators, Destec Energy, FMA, Edison.
    \57\Columbia Distribution, Con Edison, Enron, KGPL, National, 
Natural, Transco, and UDC.
---------------------------------------------------------------------------

    The Commission finds that the Working Groups should continue to 
examine and explore means of reaching a compromise on this issue. The 
Commission does not agree that the views of any one group should 
predominate over others. The parties should seek to accommodate each 
other's interests, as they have on other issues, a process more likely 
to produce a resolution preferable to both sides than if the Commission 
decides. Should agreement on whether to provide the information prove 
elusive, the parties should, at a minimum, seek to agree upon a cost 
effective method of providing the information if the Commission 
determines it is necessary.

B. Communication Protocols for Uploading Files and Downloading Subsets 
of Files

    In the NOPR, the Commission stated that development of standards 
permitting users to transmit (upload) files to the pipelines' computers 
as well as to download subsets of files could increase the efficiency 
of the capacity allocation mechanism. File upload capability, for 
example, would permit bidders to submit their bids electronically 
without having to sign-on to the pipelines' on-line EBBs. The ability 
to download a subset of a capacity release file, such as release 
information received after a certain date, would permit users to 
eliminate unneeded information from the files they download and also 
increase the efficiency of the communication process. The Commission 
endorsed Working Group 4's plan to continue its efforts to develop 
these capabilities.
    Many commenters support file uploading to provide efficient 
communication.\58\ Others, principally pipelines, raise questions about 
file uploading. They contend file uploading is not as well suited as 
on-line EBBs to handling bids submitted near the close of bidding 
periods, because, unlike EBBs, uploading is not an interactive system 
permitting immediate notification to bidders of errors in their 
bids.\59\
---------------------------------------------------------------------------

    \58\Power Generators, Columbia Distribution, Con Edison, NYMEX/
EnerSoft, Edison, Tenneco (noting effort should not be 
oversimplified), WEV, and Williston Basin (noting uploads must be 
coordinated with interactive EBBs, especially at the end of bidding 
periods when quick action is needed).
    \59\El Paso, Natural, Transco, Northwest, KGPL, National (also 
may expose pipelines' computers to security risks, such as viruses).
---------------------------------------------------------------------------

    Edison states downloading of file subsets should be a priority. 
Columbia Gas maintains downloads of subsets based on dates is 
reasonable, but adding other criteria could be burdensome, while 
Williston Basin contends any subset downloads would be too expensive. 
UDC suggests the Commission should not mandate file uploading or 
downloading of file subsets, but should trust the market to develop 
these capabilities if they are needed.
    The Commission is convinced that the development of effective file 
uploading and subset downloading capability would markedly enhance 
communication efficiency related to capacity release. Working Group 4 
should continue to assign a high priority to developing standards in 
this area. The Commission recognizes the concerns with uploads 
submitted close to the end of the bidding period, but is confident the 
Working Groups can develop the necessary standards to deal with this 
issue.\60\
---------------------------------------------------------------------------

    \60\For example, one possible approach the Working Groups could 
consider is whether all bids received within some time period prior 
to the close of the bidding period should be treated as having been 
received at the same time.
---------------------------------------------------------------------------

C. Standardization of Non-Capacity Release Business Transactions

    The industry established Working Group 3 to consider the 
development of standards relating to business practices, other than 
capacity release, resulting from the business changes fostered by 
pipeline restructuring under Order No. 636. In its report, the Working 
Group did not propose any standards; it outlined the areas of highest 
priority and its process for continuing to examine these issues. 
Several commenters support the continuation of these efforts, 
maintaining standardization of these business data is critically 
important to the industry.\61\ Vesta contends the Commission should 
require the pipelines now to provide the 16 data items tentatively 
established by Working Group 3 as being the most critical. Others 
oppose the continuation of Working Group 3's deliberations, arguing 
standards in these areas are not required by Order No. 636 and the 
Commission should limit its promulgation of standards to those 
essential for capacity release.\62\
---------------------------------------------------------------------------

    \61\Exxon, NGSA, O&R.
    \62\PEC Pipeline Group, UDC, Tenneco.
---------------------------------------------------------------------------

    The Commission has recognized the restructuring occasioned by Order 
No. 636 likely will result in changes to business practices, apart from 
capacity release, which could require further standardization.\63\ 
Standardizing capacity release information was the first step in this 
process, but now the Working Groups should turn their attention to 
standards for these other business transactions.
---------------------------------------------------------------------------

    \63\See Order No. 636-A, III FERC Stats. & Regs. Preambles at 
30,459 (standards may be needed to ensure efficient movement of gas 
across pipelines); March 10, 1993, Notice (capacity release 
standards first step in standardization).
---------------------------------------------------------------------------

    From over 66 items proposed for review, Working Group 3 found 33 to 
be of high priority, and of those 33, focused its initial review on ten 
elements.\64\ In the Commission's view, standardization of these ten, 
or most of them, would provide a good departure point for this effort. 
The Commission realizes all facets of the industry may not have equal 
need for all these elements, but these elements would appear to have 
wide enough coverage that the benefits from standardization will be 
widespread. Moreover, once standards are in place, those who may not 
now perceive a need for standards, may come to realize the standards 
will make their business more efficient, and even those who do not need 
the standards themselves, stand to benefit if other segments of the 
industry become more efficient.\65\ The Working Group should propose an 
appropriate implementation schedule for the ten identified data 
elements. The Working Group also should continue its efforts to 
identify which of the remaining 23 high priority data elements, as well 
as any others, require standardization and propose a schedule for 
implementation of standards for these elements as well.
---------------------------------------------------------------------------

    \64\The ten elements were: timely flowing volume; timely volume 
allocation reports; predetermined allocations and shipper ranking; 
imbalance status; customer scheduled receipts and deliveries; 
customer specific curtailment/interruption information; customer 
specific operational flow orders; daily nominated volume 
acknowledgement; customer penalty status; and input and modify gas 
nominations. Working Group 3 Report at 5-6.
    \65\For example, if standards reduce producers' costs or result 
in making gas a more viable option for fuel switchable users, all 
will benefit from lower prices and greater use of the gas 
transportation system.
---------------------------------------------------------------------------

D. Policy Issues

    The minority reports and initial comments raised questions about 
three policy issues: the method of recovering the costs of 
standardization, pipeline disclaimers of liability for EBB operation, 
and the disclosure of non-price considerations underlying capacity 
release transactions. The Commission stated in the NOPR that such 
substantive policy issues are beyond the scope of this proceeding and 
are more appropriately considered in individual proceedings.
1. Costs of Standardization
    In the NOPR, the Commission recognized the concern of firm shippers 
that the costs of compliance with the EBB standards should be spread 
equitably across all those benefitting from the standards. The 
Commission encouraged the industry to consider methods for ensuring 
equitable sharing of such costs, such as user or access fees.
    Many commenters support development of a fair and equitable method 
of allocating costs.\66\ Transco and Williston Basin maintain EDI, in 
particular, is not suitable for all customers and suggest the costs of 
implementing this technology should be borne by those benefitting from 
it. PSCW contends LDCs should not have to subsidize the costs of 
providing information benefitting other parties and suggests an 
incremental pricing system for all information beyond a basic level. A 
number of commenters are concerned about leaving the issue solely to 
rate cases.\67\ They maintain the policy needs to be consistent across 
pipelines and urge the Commission to decide on the method for 
allocating costs in this proceeding or in another generic proceeding, 
leaving implementation to individual rate cases. Power Generators 
opposes inclusion of this issue in the Working Groups, because the 
success of the Groups was due to their focus on technical issues.
---------------------------------------------------------------------------

    \66\AGA. UDC, WEV.
    \67\AER/MRT, Brooklyn Union, Columbia Distribution, UDC.
---------------------------------------------------------------------------

    El Paso, Tenneco, and INGAA contend user or access fees are not 
appropriate for recovery of upfront costs, and Natural expresses 
concern that access fees may not be sufficient to compensate 
pipelines.68 FMA suggests, in the absence of consensus on a new 
approach, the proper approach is to continue with the Order No. 636 
policy of recovering fixed costs through reservation charges and only 
variable costs through usage charges.
---------------------------------------------------------------------------

    \6\8INGAA suggests direct charges may be appropriate for 
additional services and features that go beyond the standards to be 
adopted by the Commission.
---------------------------------------------------------------------------

    In general, the Commission finds that its previous policy of 
permitting the pipelines to recover fixed costs through a reservation 
charge and only variable costs through a usage charge is appropriate 
for the basic EBB service. This basic service includes, at a minimum, 
the downloadable data sets and communication protocols established in 
this rule, which the Commission finds are necessary to promote a viable 
capacity release market and should provide generalized system-wide 
benefits to all users of the pipeline grid. Until additional standards 
are presented, the Commission cannot determine whether they provide 
sufficient benefits to the industry as a whole to warrant inclusion in 
the basic EBB package.
    For enhancements to the basic EBB service, which are not of general 
benefit, the Commission is open to considering cost recovery approaches 
that will recover fixed costs from the limited number of users deriving 
benefit from the service. The Commission encourages the industry to 
pursue such approaches.
    As an example, pipelines could consider using a process for 
recovering the costs of enhancements to the standard EBB package from 
only those customers that subscribe to the enhancements. The pipeline 
could explore with the users of its EBB the costs of providing a 
particular service or group of services and methods of recovering these 
costs from the subscribing users, such as through access fees, 
reservation charges, or direct charges. The pipeline and the users also 
could establish mechanisms for reimbursing the initial subscribers if 
additional users later evince an interest in obtaining the services. 
Once having obtained agreement from those customers desiring the 
service, the pipeline could make a tariff filing to establish the 
method of recovery or submit an application or petition for a 
declaratory order requesting advance Commission review of the proposed 
costs and charges.69
---------------------------------------------------------------------------

    \6\918 CFR 385.204, 385.207. This process would be similar to 
the advance approval for research, development, and demonstration 
projects. 18 CFR 154.38(d)(5).
---------------------------------------------------------------------------

2. Liability
    Several commenters suggest the liability standard for EBB 
operations should be the same across all pipelines and, therefore, 
should be resolved either in this proceeding or in another generic 
proceeding.70 Peoples Gas, et al., supports consideration of the 
issue in individual proceedings, but suggests the Commission restate 
here its standard that pipeline liability for EBB operations should be 
no different than for other operations. UDC asks the Commission to 
state that it will enforce its standard. Some parties contend the 
Commission should adopt a new standard, arguing EBBs are not like other 
pipeline operations since parties other than the pipeline are 
responsible for providing information.71 Because verification of 
such information is time consuming, they recommend each party ensure 
the accuracy of the information it provides. Con Edison, in contrast, 
argues that pipeline tariff provisions regarding EBB user 
indemnification of the pipeline are too onerous and hold the EBB user 
to a higher standard of responsibility than applies to the pipeline. 
Enron contends the issue is beyond the scope of this proceeding.
---------------------------------------------------------------------------

    \7\0Columbia Distribution, Con Edison, NGSA, NYMEX/EnerSoft.
    \7\1Tenneco, Con Edison, NYSEG, WEV (knowingly providing false 
information should subject provider to damages).
---------------------------------------------------------------------------

    The Commission agrees that this issue goes beyond the technical 
concerns with standards development which were the focus of this 
proceeding. The Commission can determine policy related issues in 
individual cases without having to establish a new generic proceeding 
and already has addressed this issue in restructuring orders. The 
Commission has adopted the principle that a pipeline's liability for 
EBB operations should be the same as for its other operations.72 
The Commission also has addressed user liability standards in 
individual restructuring orders based upon the specific pipeline EBB 
agreement.73 In general, the Commission has determined that a 
user's liability for unauthorized use of a customer identification 
number is limited to negligence or a wrongful act.
---------------------------------------------------------------------------

    \7\2Algonquin Gas Transmission Company, 65 FERC 61,019 slip op. 
at 23-24 (1993); Great Lakes Gas Transmission Limited Partnership, 
65 FERC 61,004 slip op. at 29-30 (1993).
    \7\3South Georgia Natural Gas Company, 64 FERC 61,251 slip op. 
11-12 (1993); East Tennessee Natural Gas Company, 65 FERC 61,223 
(1993).
---------------------------------------------------------------------------

3. Non-Price Considerations
    O&R contends standards are needed to guard against capacity 
releases involving deals for indirect consideration, such as capacity 
release transactions tied to gas supply arrangements. It asserts this 
issue is not better addressed in individual proceedings, but requires a 
definitive policy statement. The Commission adheres to its conclusion 
that this issue is outside the scope of this technical rulemaking and 
should not be an issue considered by the continuing Working Group 
sessions. The Commission has addressed this concern in individual 
restructuring proceedings based on the facts and circumstances in each 
case.74 As pointed out previously, should the Commission decide a 
general policy in this area is required in the future, the Commission 
need not articulate its policy through a generic proceeding, but can do 
so in individual proceedings.
---------------------------------------------------------------------------

    \7\4See Northwest Pipeline Corporation, 63 FERC 61,124 at 
61,803 (1993); Pacific Gas Transmission Company, 64 FERC  61,052 at 
61,455-56 (1993).
---------------------------------------------------------------------------

E. Gas Industry Standards Board

    Several of the Working Group reports, and initial comments, 
endorsed the development of a Gas Industry Standards Board (GISB) which 
ultimately would replace the Working Groups and continue the 
development and maintenance of industry-wide standards. In the NOPR, 
the Commission stated it was interested in this concept and invited 
submission of a proposal as to how it would operate.
    Many commenters support an industry standards board in concept as 
long as all industry segments are represented, but noted the concept is 
still in the planning phase so any detailed comments would be 
premature.75 A number of commenters emphasized that the GISB 
concept should not interfere with the on-going efforts of the Working 
Groups. El Paso did not support an industry standards board unless it 
was limited to communication format standards, and O&R contended such a 
board should be an advisory panel only. Con Edison, in contrast, 
contends the scope of the board should be extended beyond electronic 
communication to include standardization relating to pipeline 
operations, imbalances, and nominations.
---------------------------------------------------------------------------

    \7\5See Power Generators, Northwest, Tenneco, Williston Basin, 
AGA, AER/MRT, AGD, Brooklyn Union, Columbia Distribution, Columbia 
Gas, Destec Energy, Exxon, NGSA, Process Gas Consumers Group , IPAA, 
KGPL, Transco, UDC, Natural, Peoples Gas, et al., Edison, Texaco, 
PEC Pipeline Group.
---------------------------------------------------------------------------

    On November 2, 1993, the Commission met with representatives from 
the Natural Gas Council to hear a report on the progress of GISB. The 
Commission remains interested in this concept and looks forward to a 
detailed proposal. When the Commission receives a proposal, it will 
give close consideration to the effects of such an independent industry 
standardization effort on all facets of the gas industry, Commission 
regulation, and state regulation.
    In the meantime, the Working Group efforts should continue apace. 
The Working Groups should not defer or delay the development of 
standards in anticipation of the formation of a standards board. 
Moreover, they should ensure their proposals can stand alone and should 
not rely upon the eventual existence of a standards board as the means 
to administer the standards.

VIII. Environmental Analysis

    The Commission is required to prepare an Environmental Assessment 
or an Environmental Impact Statement for any action that may have a 
significant adverse effect on the human environment.76 The 
Commission has categorically excluded certain actions from these 
requirements as not having a significant effect on the human 
environment.77 The action taken here falls within the categorical 
exclusions in the Commission's regulations for rules that are 
clarifying or procedural and that relate to information gathering, 
analysis, and dissemination.78 Therefore, an environmental 
assessment is unnecessary and has not been prepared in this rulemaking.
---------------------------------------------------------------------------

    \7\6Order No. 486, Regulations Implementing the National 
Environmental Policy Act, 52 FR 47897 (Dec. 17, 1987), FERC Stats. & 
Regs. Preambles 1986-1990  30 (1987).
    \7\718 CFR 380.4.
    \7\8See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5).
---------------------------------------------------------------------------

IX. Regulatory Flexibility Act Certification

    The Regulatory Flexibility Act of 1980 (RFA)79 generally 
requires a description and analysis of final rules that will have 
significant economic impact on a substantial number of small entities. 
Pursuant to section 605(b) of the RFA, the Commission hereby certifies 
that the regulations proposed herein will not have a significant impact 
on a substantial number of small entities.
---------------------------------------------------------------------------

    \7\95 U.S.C. 601-612.
---------------------------------------------------------------------------

X. Information Collection Requirement

    Office of Management and Budget (OMB) regulations require approval 
of certain information collection requirements imposed by agency 
rules.80 The information/EBB requirements of this final rule are 
under FERC-549(B), Gas Pipeline Rates: Capacity Release Information, 
(OMB Control No. 1902-0169).
---------------------------------------------------------------------------

    \8\05 CFR 1320.14.
---------------------------------------------------------------------------

    The required information under FERC-549(A) enables the Commission 
to carry out its legislative mandate under the NGA and NGPA and will 
ensure a viable capacity release market under Commission Order No. 636. 
Specifically, the required information allows the Commission to review/
monitor capacity release transactions and firm and interruptible 
capacity made available directly from pipelines and to take appropriate 
action, where and when necessary.
    The Commission is submitting notification of these information/EBB 
requirements to OMB for its review and approval. Interested persons may 
send comments regarding the burden estimates or any other aspect of 
these EBB standards/information requirements, including suggestions for 
reducing the estimated burden, by contacting the Federal Energy 
Regulatory Commission, 941 North Capitol Street, NE., Washington, DC 
20426 [Attention: Michael Miller, Information Services Division, (202) 
208-1415]. Comments on the requirements of the subject final rule may 
also be sent to the Office of Information and Regulatory Affairs, 
Office of Management and Budget, Washington, DC 20503 [Attention: Desk 
Officer for Federal Energy Regulatory Commission].

XI. Effective Date

    This final rule shall take effect February 4, 1994.

List of Subjects in 18 CFR Part 284

    Continental shelf, Natural gas, Reporting and recordkeeping 
requirements.

    By the Commission.
Lois D. Cashell,
Secretary.

    In consideration of the foregoing, part 284, chapter I, title 18, 
Code of Federal Regulations, is amended as set forth below.

PART 284--CERTAIN SALES AND TRANSPORTATION OF NATURAL GAS UNDER THE 
NATURAL GAS POLICY ACT OF 1978 AND RELATED AUTHORITIES

    1. The authority citation for part 284 continues to read as 
follows:

    Authority: 15 U.S.C. 717-717w, 3301-3432; 42 U.S.C. 7101-7532; 
43 U.S.C. 1331-1356.

    2. In Sec. 284.8, paragraph (b)(5) is redesignated paragraph (b)(6) 
and new paragraph 284.8(b)(5) is added to read as follows:

Sec. 284.8  Firm transportation service.

* * * * *
    (b) * * *
    (5) Standardization of information provided on Electronic Bulletin 
Boards.
    (i) An interstate pipeline must provide access to standardized 
information relevant to the availability of service on its system on 
its Electronic Bulletin Board and through downloadable files in 
compliance with standardized communication protocols. The standardized 
information and the communication protocols are found in ``Standardized 
Data Sets And Communication Protocols,'' which can be obtained from the 
Public Reference and Files Maintenance Branch, Federal Energy 
Regulatory Commission, 941 North Capitol Street NE., Washington DC 
20426.
    (ii) An interstate pipeline must implement these standards, 
procedures, and protocols by June 1, 1994, unless the Standardized Data 
Sets And Communication Protocols specify an implementation date.
* * * * *
    3. In Sec. 284.9, paragraph (b)(4) is revised to read as follows:

Sec. 284.9  Interruptible transportation service.

* * * * *
    (b) * * *
    (4) The requirement of paragraph (b)(3) of this section must be 
implemented through the use of an Electronic Bulletin Board with the 
features required under Sec. 284.8(b)(4) and complying with 
Sec. 284.8(b)(5).
* * * * *
    Note: This Appendix will not appear in the Code of Federal 
Regulations.

Appendix A--Parties Filing Comments on the Notice of Proposed 
Rulemaking

Docket No. RM93-4-000

------------------------------------------------------------------------
                     Commenter                           Abbreviation   
------------------------------------------------------------------------
Ad Hoc Group of Power Generators\81\ and Edison      Power Generators.  
 Electric Institute.                                                    
American Gas Association...........................  AGA.               
ANR Pipeline Company and Colorado Interstate Gas     ANR/CIG.           
 Company.                                                               
Arkla Energy Resources Company and Mississippi       AER/MRT.           
 River Transmission Corporation.                                        
Associated Gas Distributors........................  AGD.               
Brooklyn Union Gas Company.........................  Brooklyn Union.    
Columbia Gas Distribution Companies\82\............  Columbia           
                                                      Distribution.     
Columbia Gas Transmission Corporation and Columbia   Columbia Gas.      
 Gulf Transmission Company.                                             
Consolidated Edison Company of New York, Inc.......  Con Edison.        
Destec Energy, Inc.................................  Destec Energy.     
El Paso Natural Gas Company........................  El Paso.           
Enron Interstate Pipelines (Northern Natural Gas     Enron.             
 Company, Transwestern Pipeline Company, and                            
 Florida Gas Transmission Company).                                     
Exxon Corporation..................................  Exxon.             
Fuel Managers Association..........................  FMA.               
Hadson Gas Systems, Inc............................  Hadson.            
Independent Petroleum Association of America.......  IPAA.              
Interstate Natural Gas Association of America......  INGAA.             
Koch Gateway Pipeline Company......................  KGPL.              
National Fuel Gas Supply Corporation...............  National.          
National Registry of Capacity Rights...............  National Registry. 
Natural Gas Pipeline Company of America............  Natural.           
Natural Gas Supply Association.....................  NGSA.              
New York Mercantile Exchange and Enersoft            NYMEX/EnerSoft.    
 Corporation.                                                           
New York State Electric & Gas Corporation..........  NYSEG.             
Northwest Pipeline Corporation.....................  Northwest.         
O&R Energy, Inc....................................  O&R.               
Peoples Gas Light and Coke Company, North Shore Gas  Peoples Gas, et al.
 Company, and Northern Illinois Gas Company.                            
Process Gas Consumers Group, American Iron and       Process Gas        
 Steel Institute, and Georgia Industrial Group.       Consumers Group.  
Public Service Commission of Wisconsin.............  PSCW.              
Sabine Pipe Line Company...........................  Sabine.            
Southern California Edison Company.................  Edison.            
Tenneco Gas........................................  Tenneco.           
Texaco, Inc........................................  Texaco.            
Texas Eastern Transmission Corporation, Panhandle    PEC Pipeline Group.
 Eastern Pipe Line Company, Trunkline Gas Company,                      
 and Algonquin Gas Transmission Company.                                
Transcontinental Gas Pipe Line Corporation.........  Transco.           
UGI Utilities, Inc.................................  UGI.               
United Distribution Companies......................  UDC.               
Vesta Energy Company...............................  Vesta.             
Williams Energy Ventures, Inc......................  WEV.               
Williston Basin Interstate Pipeline Company........  Williston Basin.   
------------------------------------------------------------------------
\81\This group includes American Electric Power Service Corporation,    
  Atlantic City Electric Company, Boston Edison Company, Energy Service,
  Inc., Fuel Managers Association, New England Power Service Company,   
  Northern States Power Company, Northeast Utilities, Potomac Electric  
  Power Company, Southern Company Services, Virginia Electric and Power 
  Company, West Texas Utilities Company, and Wisconsin Electric Power   
  Company.                                                              
\82\Columbia Gas of Kentucky, Inc., Columbia Gas of Maryland, Inc.,     
  Columbia Gas of Ohio, Inc., Columbia Gas of Pennsylvania, Inc., and   
  Commonwealth Gas Services, Inc.                                       

[FR Doc. 94-45 Filed 1-4-94; 8:45 am]
BILLING CODE 6717-01-P

Complete official Federal Register PDF

FR Doc. 94-29 Station Call Sign Administrators for Club and Military Recreation Stations
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 542-543]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-29]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 0, 1, and 97

[FCC 93-546]

 

Station Call Sign Administrators for Club and Military Recreation 
Stations

AGENCY: Federal Communications Commission.

ACTION: Final rules.

-----------------------------------------------------------------------

SUMMARY: This action vacates the rule provisions that established 
private entity club call sign administrators and reinstates prior 
rules. A new proposal regarding call signs will meet the need for 
persons interested in obtaining a club station license. Hence, it is 
not necessary to retain the club call sign administrator rules adopted 
in an earlier action.

EFFECTIVE DATE: February 4, 1994.

FOR FURTHER INFORMATION CONTACT:
Maurice J. DePont, Federal Communications Commission, Private Radio 
Bureau, Washington, DC 20554, (202) 632-4964.

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's 
Memorandum Opinion and Order, adopted December 13, 1993, and released 
December 29, 1993. The complete text of this Commission action, 
including the rule amendments, is available for inspection and copying 
during normal business hours in the FCC Reference Center (room 230), 
1919 M Street, NW., Washington, DC. The complete text of this 
Memorandum Opinion and Order, including the rule amendments, may also 
be purchased from the Commission's copy contractor, International 
Transcription Services, Inc., (ITS, Inc.), 2100 M Street, NW., suite 
140, Washington, DC 20037.

Summary of Memorandum Opinion and Order

    1. On May 11, 1993, final rules were adopted that established call 
sign administrators for club and military recreation stations in the 
amateur service. Subsequently, a petition for reconsideration was filed 
in which it was argued that the establishment of such administrators 
was not minor and non-controversial and that a notice and comment 
proceeding should have been held before final rules were adopted.
    2. Further, the Commission is activating a new automated licensing 
system that will enable it to perform, with minimal burden, the 
function that administrators in the private sector were going to 
perform without reimbursement. Also, a new proposal by the Commission 
regarding call signs will meet the need of persons interested in 
obtaining a club station license.
    3. Because there appears to be merit in the argument that the 
establishment of administrators is controversial, and because the new 
proposal will meet the need of persons interested in the club station 
licenses, the rule provisions that established private entity club call 
sign administrators can be vacated.
    4. Accordingly, by this action, the rules establishing 
administrators are vacated, the prior rules are reinstated, and the 
petition for reconsideration is granted.
    5. The amended rules are set forth at the end of this document.
    6. The amended rules have been analyzed with respect to the 
Paperwork Reduction Act of 1980, 44 U.S.C. 3501-3520, and found to 
contain no new or modified form, information collection and/or record 
retention requirements, and will not increase or decrease burden hours 
imposed on the public.
    7. This Memorandum Opinion and Order and the rule amendments are 
issued under the authority of 47 U.S.C. 154(i), 303(r), and 405(a).

List of Subjects

47 CFR Part 0

    Organization and functions.

47 CFR Part 1

    Radio.

47 CFR Part 97

    Applications, Club stations, Radio.

Federal Communications Commission.
William F. Caton,
Acting Secretary.

Amended Rules

    Parts 0, 1, and 97 of chapter 1 of title 47 of the Code of Federal 
Regulations are amended as follows:

PART 0--COMMISSION ORGANIZATION

    1. The authority citation for part 0 continues to read as follows:

    Authority: Sec. 5, 48 Stat. 1068, as amended; 47 U.S.C. 155, 
unless otherwise noted.

Sec. 0.131  [Amended]

    2. Section 0.131 is amended by removing paragraph (k).

Sec. 0.331  [Amended]

    3. Section 0.331 is amended by removing paragraph (d).

Sec. 0.486  [Removed]

    4. Section 0.486 is removed.

PART 1--PRACTICE AND PROCEDURE

    The authority citation for part 1 continues to read as follows:

    Authority: Secs. 4, 303, 48 Stat. 1066, 1082, as amended; 47 
U.S.C. 154, 303; Implement, 5 U.S.C. 552, unless otherwise noted.

    1. Section 1.912(a) is revised to read as follows:

Sec. 1.912  Where applications are to be filed.

    (a) Each application for a new amateur service operator/primary 
station license and each application involving a change in operator 
class must be submitted to the volunteer examiners (VEs) administering 
the qualifying examination. See Sec. 97.17(c) of this chapter. The VEs 
are required to submit the applications of persons passing their 
respective examinations for amateur operator licenses to the Volunteer-
Examiner Coordinator (VEC). All other applications for amateur service 
licenses must be submitted to FCC, 1270 Fairfield Road, Gettysburg, PA 
17325-7245.
* * * * *

PART 97--AMATEUR RADIO SERVICE

    The authority citation for part 97 continues to read as follows:

    Authority: 48 Stat. 1066, 1082, as amended; 47 U.S.C. 154, 303. 
Interpret or apply 48 Stat. 1064-1068, 1081-1105, as amended; 47 
U.S.C. 151-155, 301-609, unless otherwise noted.

    1. Section 97.17 is amended by revising paragraph (b) to read as 
follows. In addition, paragraph (g) is removed.

Sec. 97.17  Application for new license.

* * * * *
    (b) Each application for a new operator/primary station license 
must be made on FCC Form 610. Each application for a reciprocal permit 
for alien amateur licensee must be made on FCC Form 610-A. No new 
license for a club, military recreation, or RACES station will be 
issued.
* * * * *
    2. Paragraphs (a) and (b) of Sec. 97.19 are revised to read as 
follows:

Sec. 97.19  Application for a renewed or modified license.

    (a) Each application for a renewed or modified operator/primary 
station license must be made on FCC Form 610. Each application for a 
renewed or modified club, military recreation, or RACES station license 
must be made on FCC Form 610-B. A reciprocal permit for alien amateur 
licensee is not renewable. A new reciprocal permit may be issued upon 
proper application.
    (b) Each application for a renewed or modified amateur service 
license must be accompanied by a photocopy of the license document or 
the original document, unless it has been lost, mutilated, or 
destroyed. Each application for a modified operator license involving a 
change in operator class must be submitted to the VEs administering the 
qualifying examination. All other applications must be submitted to: 
FCC, 1270 Fairfield Road, Gettysburg, PA 17325-7245.
* * * * *

Sec. 97.29  [Removed]

    3. Section 97.29 is removed in its entirety.

[FR Doc. 94-29 Filed 1-4-94; 8:45 am]
BILLING CODE 6712-01-M

Complete official Federal Register PDF

FR Doc. 94-21 Airworthiness Directives; Airbus Industrie Model A310 and A300- 600 Series Airplanes
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 507-509]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-21]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 93-NM-208-AD; Amendment 39-8783; AD 93-24-51]

 

Airworthiness Directives; Airbus Industrie Model A310 and A300-
600 Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: This document publishes in the Federal Register an amendment 
adopting Airworthiness Directive (AD) T93-24-51 that was sent 
previously to all known U.S. owners and operators of all Airbus Model 
A310 and A300-600 series airplanes by individual telegrams. This AD 
requires repetitive operational tests of feel and limitation computers 
(FLC) 1 and 2. This amendment is prompted by a report that the pitch 
control on a Model A300-600 series airplane operated with stiffness. 
The actions specified by this AD are intended to prevent stiff 
operation of the pitch control and undetected loss of rudder travel 
limitation function.

DATES: Effective January 20, 1994, to all persons except those persons 
to whom it was made immediately effective by telegraphic AD T93-24-51, 
issued December 1, 1993, which contained the requirements of this 
amendment.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of January 20, 1994.
    Comments for inclusion in the Rules Docket must be received on or 
before March 7, 1994.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, ANM-103, 
Attention: Rules Docket No. 93-NM-208-AD, 1601 Lind Avenue, SW., 
Renton, Washington 98055-4056.
    The applicable service information may be obtained from Airbus 
Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France. 
This information may be examined at the FAA, Transport Airplane 
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the 
Office of the Federal Register, 800 North Capitol Street, NW., suite 
700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Stephen Slotte, Aerospace Engineer, 
Standardization Branch, ANM-113, FAA, Transport Airplane Directorate, 
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (206) 
227-2797; fax (206) 227-130.

SUPPLEMENTARY INFORMATION: On December 1, 1993, the FAA issued 
telegraphic airworthiness directive (AD) T93-24-51, which is applicable 
to all Airbus Model A310 and A300-600 series airplanes. That action was 
prompted by a report from an operator that the pitch control on a Model 
A300-600 series airplane operated with stiffness. Investigation into 
the cause of this stiffness revealed that the feel and limitation 
computer (FLC) failed and caused stiff operation of the pitch control. 
This condition, if not corrected, could result in stiff operation of 
the pitch control and undetected loss of rudder travel limitation 
function, which may adversely affect controllability of the airplane.
    Airbus Industrie has installed these computers on all Model A310 
and A300-600 series airplanes. Each airplane has two FLC's, designated 
FLC 1 and FLC 2. The FLC and the pitch feel fault lights are integral 
components of the pitch feel system. (The pitch feel fault lights 
indicate a failure of the FLC.)
    Currently, these airplanes are allowed to operate with one 
inoperative pitch feel system. If the airplane is operated with one 
inoperative pitch feel system, failure of the other FLC could result in 
stiff operation of the pitch control and undetected loss of rudder 
travel limitation function. This failure could also allow excessive 
elevator movement, which could expose the airplane structure to 
excessive air loads.
    Airbus Industrie has issued All Operator Telex (AOT) 27-14, dated 
November 2, 1993, applicable to all Airbus Model A310 and A300-600 
series airplanes, that describes procedures for performing repetitive 
operational tests to verify proper operation of FLC's 1 and 2. The 
Direction Generale de l'Aviation Civile (DGAC), which is the 
airworthiness authority for France, classified this AOT as mandatory 
and issued French telegraphic airworthiness directive 93-202-153(b), 
dated November 2, 1993, in order to assure the continued airworthiness 
of these airplanes in France.
    This airplane model is manufactured in France and is type 
certificated for operation in the United States under the provisions of 
Sec. 21.29 of the Federal Aviation Regulations and the applicable 
bilateral airworthiness agreement. Pursuant to this bilateral 
airworthiness agreement, the DGAC has kept the FAA informed of the 
situation described above. The FAA has examined the findings of the 
DGAC, reviewed all available information, and determined that AD action 
is necessary for products of this type design that are certificated for 
operation in the United States.
    Since the unsafe condition described is likely to exist or develop 
on other airplanes of the same type design registered in the United 
States, the FAA issued Telegraphic AD T93-24-51 to require repetitive 
operational tests to verify proper operation of FLC's 1 and 2. The 
actions are required to be accomplished in accordance with the AOT 
previously described. Any FLC that fails the operational test is 
required to be repaired or replaced in accordance with a method 
approved by the FAA.
    The AD also prohibits operation of any airplane with an inoperative 
pitch feel system or inoperative pitch feel fault lights.
    Since it was found that immediate corrective action was required, 
notice and opportunity for prior public comment thereon were 
impracticable and contrary to the public interest, and good cause 
existed to make the AD effective immediately by individual telegrams 
issued on December 1, 1993, to all known U.S. owners and operators of 
all Airbus Model A310 and A300-600 series airplanes. These conditions 
still exist, and the AD is hereby published in the Federal Register as 
an amendment to Sec. 39.13 of part 39 of the Federal Aviation 
Regulations (FAR) to make it effective as to all persons.
    This is considered to be interim action. The manufacturer has 
advised that it currently is developing a modification that will 
positively address the unsafe condition addressed by this AD. Once this 
modification is developed, approved, and available, the FAA may 
consider additional rulemaking.

Comments Invited

    Although this action is in the form of a final rule that involves 
requirements affecting flight safety and, thus, was not preceded by 
notice and an opportunity for public comment, comments are invited on 
this rule. Interested persons are invited to comment on this rule by 
submitting such written data, views, or arguments as they may desire. 
Communications shall identify the Rules Docket number and be submitted 
in triplicate to the address specified under the caption ``ADDRESSES.'' 
All communications received on or before the closing date for comments 
will be considered, and this rule may be amended in light of the 
comments received. Factual information that supports the commenter's 
ideas and suggestions is extremely helpful in evaluating the 
effectiveness of the AD action and determining whether additional 
rulemaking action would be needed.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the rule that might 
suggest a need to modify the rule. All comments submitted will be 
available, both before and after the closing date for comments, in the 
Rules Docket for examination by interested persons. A report that 
summarizes each FAA-public contact concerned with the substance of this 
AD will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket Number 93-NM-208-AD.'' The postcard will be date stamped and 
returned to the commenter.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    The FAA has determined that this regulation is an emergency 
regulation that must be issued immediately to correct an unsafe 
condition in aircraft, and is not a ``significant regulatory action'' 
under Executive Order 12866. It has been determined further that this 
action involves an emergency regulation under DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979). If it is determined 
that this emergency regulation otherwise would be significant under DOT 
Regulatory Policies and Procedures, a final regulatory evaluation will 
be prepared and placed in the Rules Docket. A copy of it, if filed, may 
be obtained from the Rules Docket at the location provided under the 
caption ``ADDRESSES.''

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends 14 CFR part 
39 of the Federal Aviation Regulations as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C. 
106(g); and 14 CFR 11.89.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

93-24-51  Airbus Industrie: Amendment 39-8783. Docket 93-NM-208-AD.

    Applicability: All Airbus Model A310 and A300-600 series 
airplanes, certificated in any category.
    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent stiff operation of the pitch control and undetected 
loss of rudder travel limitation function, which may adversely 
affect controllability of the airplane, accomplish the following:
    (a) Within 7 days after the effective date of this AD, perform 
an operational test to verify proper operation of feel and 
limitation computers (FLC) 1 and 2 in accordance with Airbus 
Industrie All Operator Telex 27-14, dated November 2, 1993. 
Thereafter repeat this test at intervals not to exceed 7 days.
    (b) If any FLC fails the test, prior to further flight, replace 
with a new or serviceable FLC, or repair the FLC in accordance with 
a method approved by the Manager, Standardization Branch, ANM-113, 
FAA, Transport Airplane Directorate.
    (c) As of the effective date of this AD, no airplane shall be 
operated with an inoperative pitch feel system or inoperative pitch 
feel fault lights.
    (d) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Standardization Branch, ANM-113. 
Operators shall submit their requests through an appropriate FAA 
Principal Maintenance Inspector, who may add comments and then send 
it to the Manager, Standardization Branch, ANM-113.

    Note: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Standardization Branch, ANM-113.

    (e) Special flight permits may be issued in accordance with FAR 
21.197 and 21.199 to operate the airplane to a location where the 
requirements of this AD can be accomplished.
    (f) The test shall be done in accordance with Airbus Industrie 
All Operator Telex 27-14, dated November 2, 1993. This incorporation 
by reference was approved by the Director of the Federal Register in 
accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be 
obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 
Blagnac Cedex, France. Copies may be inspected at the FAA, Transport 
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or 
at the Office of the Federal Register, 800 North Capitol Street, 
NW., suite 700, Washington, DC.
    (g) This amendment becomes effective on January 20, 1994, to all 
persons except those persons to whom it was made immediately 
effective by telegraphic AD T93-24-51, issued December 1, 1993, 
which contained the requirements of this amendment.

    Issued in Renton, Washington, on December 28, 1993.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 94-21 Filed 1-4-94; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 94-177 Federal Acquisition Regulation; Implementation of the North American Free Trade Agreement Implementation Act
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 544-549]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-177]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 5, 14, 15, 17, 25, and 52

[FAC 90-19; FAR Case 93-310]

 

Federal Acquisition Regulation; Implementation of the North 
American Free Trade Agreement Implementation Act

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule with request for comment.

-----------------------------------------------------------------------

SUMMARY: The Department of Defense, General Services Administration, 
and National Aeronautics and Space Administration have agreed to an 
interim rule implementing the North American Free Trade Agreement 
(NAFTA) Implementation Act.

DATES: Effective Date: January 1, 1994. This rule applies to 
solicitations issued on or after January 1, 1994.

    Comment Date: Comments should be submitted to the FAR Secretariat 
on or before March 7, 1994, to be considered in the formulation of a 
final rule.

ADDRESSES: Interested parties should submit written comments to: 
General Services Administration, FAR Secretariat (VRS), 18th & F 
Streets, NW., room 4037, Washington, DC 20405. Please cite FAC 90-19, 
FAR case 93-310 in all correspondence related to this case.

FOR FURTHER INFORMATION CONTACT:
Mr. Peter O'Such at (202) 501-1759 in reference to this FAR case. For 
general information, contact the FAR Secretariat, room 4037, GSA 
Building, Washington, DC 20405 (202) 501-4755. Please cite FAC 90-19, 
FAR case 93-310.

SUPPLEMENTARY INFORMATION:

A. Background

    Chapter Ten of NAFTA requires the three NAFTA countries (the United 
States, Canada, and Mexico) to eliminate ``buy national'' restrictions 
on non-defense related purchases, by their responsible Federal 
Governments, of goods and services provided by firms in North America. 
NAFTA applies to most United States Government agencies. The Canadian 
Free Trade Agreement is suspended while NAFTA remains in effect.
    As required by NAFTA, specified agencies must evaluate certain 
NAFTA country end products offers without regard to the restrictions of 
the Buy American Act or the Balance of Payments Program. This 
evaluation method will apply to offers of Canadian end products under 
supply contracts with an estimated value above $25,000 and Mexican end 
products under supply contracts with an estimated value of $50,000 or 
more, except for the Department of Energy's Power Marketing 
Administrations, where the estimated acquisition value is $250,000 or 
more. This evaluation method also will apply to construction contracts 
with an estimated acquisition value of $6,500,000 or more, except for 
the Department of Energy's Power Marketing Administration, where the 
estimated acquisition value is $8,000,000 or more.
    The applicable rule of origin for NAFTA country end products under 
the agreement is that of ``substantial transformation'', which means an 
article that is wholly the growth, product, or manufacture of a NAFTA 
country or has been substantially transformed in a NAFTA country into a 
new and different article may be offered.
    This rule also--
    (1) Designates NAFTA country end products as eligible products 
under the Trade Agreements Act, as implemented in Trade Agreements 
under the FAR;
    (2) Adds language to require that, when an overseas procurement for 
performance overseas is subject to NAFTA, it will be synopsized in 
accordance with agency procedures;
    (3) Revises the prescriptions for the provisions, Submission of 
Offers in the English Language, and Submission of Offers in U.S. 
Currency, to clarify and include NAFTA;
    (4) Updates the list of designated countries in FAR 25.401 to add 
``Portugal'' and revise ``Upper Volta'' to ``Burkina Faso'';
    (5) Includes the new threshold of $182,000 for application of the 
Trade Agreements Act and the European Community (EC) Agreement, which 
is effective January 1, 1994;
    (6) Updates FAR 25.407 list of agencies covered by the Agreements 
on EC and NAFTA; and
    (7) Makes clarifications to the interim rule published in FAC 90-18 
(58 FR 31140), at FAR 25.407, to implement the Memorandum of 
Understanding between the United States of America and the European 
Economic Community on Government Procurement and NAFTA.

B. Regulatory Flexibility Act

    The interim rule may have a significant economic impact on a 
substantial number of small entities within the meaning of the 
Regulatory Flexibility Act, 5 U.S.C. 601 et seq., because the rule 
waives the Buy American Act for certain Mexican and Canadian products. 
An Initial Regulatory Flexibility Analysis (IRFA) has been prepared and 
will be provided to the Chief Counsel for Advocacy for the Small 
Business Administration. A copy of the IRFA may be obtained from the 
FAR Secretariat. Comments are invited. Comments from small entities 
concerning the affected FAR subpart will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAR Case 93-310), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act (Pub. L. 96-511) is deemed to apply 
because the new provision at 52.225-20 requires offerors to list the 
line item number and country of origin for any end product other than a 
domestic end product. Accordingly, a request for clearance of a new 
information collection requirement concerning the NAFTA Act is being 
submitted to the Office of Management and Budget under 44 U.S.C. 3501, 
et seq. Public comments concerning this requirement are invited through 
an OMB clearance request appearing in the Federal Register at 58 FR 
68636, December 28, 1993.

D. Determination To Issue an Interim Rule

    A determination has been made under the authority of the Secretary 
of Defense (DOD), the Administrator of General Services (GSA), and the 
Administrator of the National Aeronautics and Space Administration 
(NASA) that compelling reasons exist to promulgate this interim rule 
without prior opportunity for public comment. This action is necessary 
because the NAFTA Implementation Act, signed into law on December 8, 
1993, becomes effective on January 1, 1994. However, pursuant to Public 
Law 98-577 and Federal Acquisition Regulation 1.501, public comments 
received in response to this interim rule will be considered in 
formulating the final rule.

List of Subjects in 48 CFR Parts 5, 14, 15, 17, 25, and 52

    Government procurement.

    Dated: December 30, 1993.
Shirley Scott,
Acting Director, Office of Federal Acquisition Policy.

    Unless otherwise specified, all Federal Acquisition Regulation 
(FAR) and other directive material contained in FAC 90-19 is effective 
January 1, 1994.

    Dated: December 21, 1993.
Eleanor R. Spector,
Director, Defense Procurement, Department of Defense (DOD).
    Dated: December 20, 1993.
Richard H. Hopf, III,
Associate Administrator for Acquisition Policy, General Services 
Administration.
    Dated: December 21, 1993.
Deidre A. Lee,
Associate Administrator for Procurement, NASA.
    Therefore, 48 CFR parts 5, 14, 15, 17, 25, and 52 are amended as 
set forth below:
    1. The authority citation for 48 CFR parts 5, 14, 15, 17, 25, and 
52 continues to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 5--PUBLICIZING CONTRACT ACTIONS

    2. Section 5.202 is amended in paragraph (a)(12) by adding a third 
sentence to read as follows:

5.202  Exceptions.

    (a) * * *
    (12) * * * This exception also does not apply to North American 
Free Trade Agreement contract actions, which will be synopsized in 
accordance with agency regulations.
* * * * *

PART 14--SEALED BIDDING

    3. Section 14.201-6 is amended by revising paragraphs (x) and (y) 
to read as follows:

14.201-6  Solicitation provisions.

* * * * *
    (x) The provision at 52.214-34, Submission of Offers in the English 
Language, is required in solicitations subject to the Trade Agreements 
Act or the North American Free Trade Agreement Implementation Act (see 
25.408(d)). It may be included in other solicitations when the 
contracting officer decides that it is necessary.
    (y) The provision at 52.214-35, Submission of Offers in U.S. 
Currency, is required in solicitations subject to the Trade Agreements 
Act or the North American Free Trade Agreement Implementation Act (see 
25.408(d)). It may be included in other solicitations when the 
contracting officer decides that it is necessary.
    4. Section 14.408-1 is amended by revising the introductory text of 
paragraph (a)(2) to read as follows:

14.408-1  Award of unclassified contracts.

    (a) * * *
    (2) For acquisitions subject to the Trade Agreements Act or the 
North American Free Trade Agreement (NAFTA) Implementation Act (see 
25.405(e)), agencies shall promptly, but in no event later than 7 
working days after award, give unsuccessful offerors from designated or 
NAFTA countries written notice stating--
* * * * *

PART 15--CONTRACTING BY NEGOTIATION

    5. Section 15.407 is amended by revising paragraphs (l) and (m) to 
read as follows:

15.407  Solicitation provisions.

* * * * *
    (l) The provision at 52.214-34, Submission of Offers in the English 
Language, is required in solicitations subject to the Trade Agreements 
Act or the North American Free Trade Agreement Implementation Act (see 
25.408(d)). It may be included in other solicitations when the 
contracting officer decides that it is necessary.
    (m) The provision at 52.214-35, Submission of Offers in U.S. 
Currency, is required in solicitations subject to the Trade Agreements 
Act or the North American Free Trade Agreement Implementation Act (see 
25.408(d)). It may be included in other solicitations when the 
contracting officer decides that it is necessary.
    6. Section 15.1001 is amended by revising paragraph (c)(2) to read 
as follows:

15.1001  Notifications to unsuccessful offerors.

* * * * *
    (c) * * *
    (2) For acquisitions subject to the Trade Agreements Act or the 
North American Free Trade Agreement (NAFTA) Implementation Act (see 
25.405(e)), the information in paragraph (c)(1) of this section shall 
be provided to unsuccessful offerors from designated or NAFTA countries 
promptly, but in no event later than seven working days after contract 
award.
* * * * *

PART 17--SPECIAL CONTRACTING METHODS

    7. Section 17.203 is amended by revising paragraph (h) to read as 
follows:

17.203  Solicitations.

* * * * *
    (h) See 25.402(a)(5) regarding use of options in calculating the 
estimated contract amount for application of the Trade Agreements Act 
and North American Free Trade Agreement thresholds.

PART 25--FOREIGN ACQUISITION

25.101  [Amended]

    8. Section 25.101 is amended in the definition Domestic end product 
by removing the last sentence.
    9. Section 25.109 is amended by revising paragraphs (d) and (f), 
redesignating paragraph (g)(2) as (g)(3), and adding a new paragraph 
(g)(2) to read as follows:

25.109  Solicitation provisions and contract clauses.

* * * * *
    (d) Except as provided in paragraph (g) of this section, or when 
the clause prescribed by paragraph (f) is used, or when the clause 
prescribed in 25.408(a)(4) is used, the contracting officer shall 
insert the clause at 52.225-3, Buy American Act-Supplies, in 
solicitations and contracts for the acquisition of supplies, or for 
services involving the furnishing of supplies, for use within the 
United States.
* * * * *
    (f) Except as provided in paragraph (g) of this section, the 
contracting officer shall insert the clause at 52.225-17, Buy American 
Act-Supplies under European Community Agreement, in solicitations and 
contracts for the acquisition of supplies, or for services involving 
the furnishing of supplies when the estimated acquisition value meets 
or exceeds $182,000 for the agencies listed at FAR 25.407, except for 
the Power Marketing Administrations' segment of the Department of 
Energy, where the estimated acquisition value is $450,000 of more.
    (g) * * *
    (2) The acquisition is made under the Trade Agreements Act (see 
subpart 25.4); or
* * * * *

25.202  [Amended]

    10. Section 25.202 is amended in paragraph (c) by removing 
``25.402(a)(4)'' and inserting ``25.402(a) (3) and (4)''.
    11. Section 25.205 is amended by revising paragraph (b) to read as 
follows:

25.205  Solicitation provision and contract clause.

* * * * *
    (b) For construction contracts with an estimated acquisition value 
of $6,500,000 ($8,000,000 for the Power Marketing Administrations) or 
more, to be awarded by agencies listed in 25.407, insert the clause at 
52.225-15, Buy American Act-Construction Materials under European 
Community and North American Free Trade Agreements, in solicitations 
and contracts for construction.
    12. Section 25.300 is amended by revising the second sentence to 
read as follows:

25.300  Scope of subpart.

    * * * The Balance of Payments Program restrictions have been waived 
with respect to the acquisition, in accordance with subpart 25.4, of 
certain products under the Trade Agreements Act of 1979 and the North 
American Free Trade Agreement (NAFTA) Implementation Act.

25.305  [Amended]

    13. Section 25.305 is amended in paragraphs (a) and (c) by adding 
``or NAFTA'' after ``1979''.
    14. Section 25.400 is amended by revising paragraph (c) to read as 
follows:

25.400  Scope of subpart.

* * * * *
    (c) Acquisitions involving offers of Canadian or Mexican end 
products under the North American Free Trade Agreement (NAFTA), as 
approved by Congress in the NAFTA Implementation Act (Pub. L. 103-182, 
107 Stat. 2057);
* * * * *
    15. Section 25.401 is amended by revising the definitions for 
``Canadian end product'' and ``Eligible product''; amending the 
``designated country'' list by removing ``Upper Volta'' and adding in 
alphabetical order ``Burkina Faso'' and ``Portugal''; and adding in 
alphabetical order the definitions ``Mexican end product'', ``North 
American Free Trade Agreement (NAFTA) country'', ``NAFTA country 
construction material'', and ``NAFTA country end product'' to read as 
follows:

25.401  Definitions.

    Canadian end product, as used in this subpart, means an article 
that (a) is wholly the growth, product, or manufacture of Canada, or 
(b) in the case of an article which consists in whole or in part of 
materials from another country or instrumentality, has been 
substantially transformed in Canada into a new and different article of 
commerce with a name, character, or use distinct from that of the 
article or articles from which it was transformed. The term includes 
services (except transportation services) incidental to its supply; 
provided, that the value of those incidental services does not exceed 
that of the product itself. It does not include service contracts as 
such.
* * * * *
    Eligible product, as used in this subpart, means a designated, 
North American Free Trade Agreement (NAFTA), or Caribbean Basin country 
end product.
* * * * *
    Mexican end product, as used in this subpart, means an article that 
(a) is wholly the growth, product, or manufacture of Mexico, or (b) in 
the case of an article which consists in whole or in part of materials 
from another country or instrumentality, has been substantially 
transformed in Mexico into a new and different article of commerce with 
a name, character, or use distinct from, that of the article or 
articles from which it was transformed. The term includes services 
(except transportation services) incidental to its supply; provided, 
that the value of those incidental services does not exceed that of the 
product itself. It does not include service contracts as such.
    North American Free Trade Agreement (NAFTA) country, as used in 
this subpart, means Canada or Mexico.
    NAFTA country construction material, means a construction material 
that (a) is wholly the growth, product, or manufacture of a NAFTA 
country or (b) in the case of a construction material which consists in 
whole or in part of materials from another country or instrumentality, 
has been substantially transformed in a NAFTA country into a new and 
different construction material distinct form the materials from which 
it was transformed.
    NAFTA country end product, as used in this subpart, means a 
Canadian end product or a Mexican end product.
    16. Section 25.402 is amended--
    (a) In paragraph (a)(1) by inserting a new sentence after the first 
sentence;
    (b) By revising paragraph (a)(3);
    (c) In the introductory text of paragraph (a)(4) by inserting 
``(European Community Agreement)'' after ``Procurement''; in (a)(4)(i) 
by revising ``25.406 or'' to read ``25.407''; and in (a)(4)(ii) by 
revising ``$176,000'' to read ``$182,000'';
    (d) In paragraphs (a)(5) introductory text and (a)(6) by inserting 
``or NAFTA'' after `'Act''; and
    (e) By removing ``country'' the first time it appears in the 
introductory text of paragraph (f) and the second time it appears in 
paragraph (f)(2) and inserting'', North American Free Trade 
Agreement,'' in their places.
    The revised text reads as follows:

25.402  Policy.

    (a)(1) * * * The current threshold is $182,000. * * *
* * * * *
    (3) As required by the North American Free Trade Agreement (NAFTA) 
Implementation Act (Pub. L. 103-182, 107 Stat. 2057), agencies shall 
evaluate offers of the following NAFTA country end products without 
regard to the restrictions of the Buy American Act (see subpart 25.1) 
or the Balance of Payments Program (see subpart 25.3):
    (i) NAFTA country construction materials under construction 
contracts with an estimated acquisition value of $6,500,000 or more for 
the agencies in 25.407, except for the Power Marketing Administration 
segments of the Department of Energy where the estimated acquisition 
value is $8,000,000 or more.
    (ii) Canadian end products under supply contracts with an estimated 
value above $25,000 and Mexican end products under supply contracts 
with an estimated value of $50,000 or more for the agencies in 25.407, 
except for the Power Marketing Administrations' segment of the 
Department of Energy, where the estimated acquisition value is $250,000 
or more.
* * * * *
    17. Section 25.403 is amended in paragraph (a) by removing ``Trade 
Agreements Act''; by revising paragraph (b); in paragraph (e) by 
inserting ``(3) and'' after ``25.402(a)''; in paragraph (h) by revising 
``25.402(a)(4)(ii)'' to read ``25.402(a)(3) and (4)''; and revising 
paragraph (l) to read as follows:

25.403  Exceptions.

* * * * *
    (b) Products of countries (1) not identified in 25.401 as 
designated, Caribbean Basin, or North American Free Trade Agreement 
countries, or (2) barred by 25.402(c);
* * * * *
    (l)(1) For purchases subject to North American Free Trade Agreement 
or the European Community Agreement, agencies not listed at 25.407;
    (2) For other purchases under this subpart, agencies not listed at 
25.406; or
* * * * *

25.405  [Amended]

    18. Section 25.405 is amended in the introductory text by inserting 
``or North American Free Trade Agreement (NAFTA)'' after ``Act''; in 
paragraph (d) by removing ``countries'' the first time it appears and 
inserting ``, NAFTA,'' in its place; and in paragraph (e) by inserting 
``or NAFTA'' after ``designated''.
    19. Section 25.406 is amended by revising the ``General Services 
Administration'' entry and adding in alphabetical order ``National 
Archives and Records Administration'' to read as follows:

25.406  Agencies covered by the Agreement on Government Procurement.

* * * * *
    General Services Administration (except Federal Supply Groups 51 
and 52 and Federal Supply Class 7340).
* * * * *
    National Archives and Records Administration.
* * * * *
    20. Section 25.407 is amended by revising the section heading; 
removing the introductory paragraph; redesignating paragraphs (a) thru 
(d) as (b) thru (e), and adding a new paragraph (a); changing ``is'' to 
``are'' in newly redesignated (d); and adding paragraphs (f) and (g) to 
read as follows:

25.407  Agencies covered by the European Community and North American 
Free Trade Agreements.

    (a) The agencies listed in 25.406.
* * * * *
    (f) Federal Housing Finance Board.
    (g) Office of Thrift Supervision.
    21. Section 25.408 is amended by removing ``Act'' following 
``Agreements'' from paragraph (a)(1) and (a)(2) the first time it 
appears; by removing ``and'' at the end of paragraph (a)(1); by 
removing the period at the end of paragraph (a)(2) and inserting a 
semicolon in its place; by adding new paragraphs (a)(3) and (a)(4); by 
revising paragraph (c); and in paragraph (d) by inserting ``or NAFTA'' 
following ``Act'' to read as follows:

25.408  Solicitation provision and contract clause.

    (a) * * *
    (3) The provision at 52.225-20, Buy American Act-North American 
Free Trade Agreement (NAFTA) Implementation Act-Balance of Payments 
Program Certificate, in solicitations containing the clause at 52.225-
21; and
    (4) The clause at 52.225-21, Buy American Act-North American Free 
Trade Agreement (NAFTA) Implementation Act-Balance of Payments Program, 
where the contracting officer has determined that the acquisition is 
not subject to the Trade Agreements Act but is subject to NAFTA.
* * * * *
    (c) The clause prescriptions at paragraph (a) of this section shall 
apply where any item under a multiple item solicitation is determined 
to be subject to the Trade Agreements Act or North American Free Trade 
Agreement Implementation Act. If the Acts do not apply to all of the 
items being solicited, the contracting officer shall indicate, in the 
schedule, those items that are exempt.
* * * * *

25.1003  [Amended]

    22. Section 25.1003 is amended in paragraphs (a)(2) and (b)(2) by 
revising ``$176,000'' to read ``$182,000''.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

52.225-3  [Amended]

    23. Section 52.225-3 is amended by revising the date of the clause 
to read ``(JAN 1994)''; by removing the last sentence from the 
definition ``Domestic end product''; and removing the parenthetical 
following paragraph (b)(4).
    24. Section 52.225-8 is amended in the section and clause headings 
by removing ``Act'' following ``Agreements'', and revising the date of 
the clause heading to read ``(JAN 1994)''; in paragraph (a) by removing 
``Act'' following ``Agreements'', and inserting ``a North American Free 
Trade Agreement (NAFTA) country,'' following ``designated country,''; 
by revising the introductory text of paragraph (c) and paragraph 
(c)(1); and in paragraph (c)(2) by removing ``Act'' following 
``Agreements''. The revised text reads as follows:

Sec. 52.225-8  Buy American Act--Trade Agreements--Balance of Payments 
Program Certificate.

* * * * *

Buy American Act--Trade Agreements--Balance of Payments Program 
Certificate (Jan 1994)

* * * * *
    (c) Offers will be evaluated by giving certain preferences to 
domestic end products, designated country end products, NAFTA 
country end products, and Caribbean Basin country end products over 
other end products. In order to obtain these preferences in the 
evaluation of each excluded end product listed in paragraph (b) of 
this provision, offerors must identify and certify below those 
excluded end products that are designated or NAFTA country end 
products, or Caribbean Basin country end products. Products that are 
not identified and certified below will not be deemed designated 
country end products, NAFTA country end products, or Caribbean Basin 
country end products. Offerors must certify by inserting the 
applicable line item numbers in the following:
    (1) The offeror certifies that the following supplies qualify as 
``designated or NAFTA country end products'' as those terms are 
defined in the clause entitled ``Buy American Act--Trade 
Agreements--Balance of Payments Program:''

(Insert line item numbers)

* * * * *
    25. Section 52.225-9 is amended in the section and clause headings 
by removing ``Act'' following ``Agreements'', and revising the date of 
the clause heading to read ``(JAN 1994)''; by revising the introductory 
text of paragraph (a) and adding in alphabetical order the definitions 
``NAFTA country'', and ``NAFTA country end product''; and revising 
paragraph (b) to read as follows:

Sec. 52.225-9  Buy American Act--Trade Agreements--Balance of Payments 
Program.

* * * * *

Buy American Act--Trade Agreements--Balance of Payments Program (Jan 
1994)

    (a) This clause implements the Buy American Act (41 U.S.C. 10), 
the Trade Agreements Act of 1979 (19 U.S.C. 2501-2582), the North 
American Free Trade Agreement (NAFTA) Implementation Act (Pub. L. 
103-182, 107 Stat. 2057) and the Balance of Payments Program by 
providing a preference for domestic end products over foreign end 
products, except for certain foreign end products which meet the 
requirements for classification as designated, NAFTA, or Caribbean 
Basin country end products.
* * * * *
    NAFTA country, as used in this clause, means Canada or Mexico.
    NAFTA country end product, as used in this clause, means an 
article that (1) is wholly the growth, product, or manufacture of a 
NAFTA country, or (2) in the case of an article which consists in 
whole or in part of materials from another country or 
instrumentality, has been substantially transformed in a NAFTA 
country into a new and different article of commerce with a name, 
character, or use distinct from that of the article or articles from 
which it was transformed. The term includes services (except 
transportation services) incidental to its supply; provided, that 
the value of those incidental services does not exceed that of the 
product itself. It does not include service contracts as such.
    (b) The Contracting Officer has determined that the Trade 
Agreements Act and NAFTA apply to this acquisition. Unless otherwise 
specified, the Acts apply to all items in the schedule. The 
Contractor agrees to deliver under this contract only domestic end 
products unless, in its offer, it specifies delivery of foreign end 
products in the provision entitled ``Buy American Act--Trade 
Agreements--Balance of Payments Program Certificate.'' An offer 
certifying that a designated, NAFTA, or Caribbean Basin country end 
product will be supplied requires the Contractor to supply a 
designated, NAFTA, or Caribbean Basin country end product or, at the 
Contractor's option, a domestic end product. Contractors may not 
supply a foreign end product for line items subject to the Trade 
Agreements Act unless the foreign end product is a designated, 
NAFTA, or Caribbean end product (see FAR 25.401), or unless a waiver 
is granted under section 302 of the Trade Agreements Act of 1979 
(see FAR 25.402(c)).
* * * * *
    26. Section 52.225-15 is amended in the section and clause headings 
by removing ``Agreement'' and inserting ``and North American Free Trade 
Agreements''; by revising the date of the clause heading to read ``(JAN 
1994)''; in paragraph (a) by adding in alphabetical order the 
definitions ``North American Free Trade Agreement (NAFTA) country'', 
and ``NAFTA country construction material''; and by revising paragraphs 
(b) and (c) to read as follows:

52.225-15  Buy American Act--Construction Materials under European 
Community and North American Free Trade Agreements.

* * * * *

Buy American Act--Construction Materials Under European Community and 
North American Free Trade Agreements (Jan 1994)

* * * * *
    North American Free Trade Agreement (NAFTA) country means Canada 
or Mexico.
    NAFTA country construction material means a construction 
material that (1) is wholly the growth, product, or manufacture of a 
NAFTA country, or (2) in the case of a construction material which 
consists in whole or in part of materials from another country or 
instrumentality, has been substantially transformed in a NAFTA 
country into a new and different construction material distinct from 
the materials from which it was transformed.
    (b) The Buy American Act (41 U.S.C. 10) provides that the 
Government give preference to domestic material. In addition, the 
Memorandum of Understanding between the United States of America and 
the European Economic Community on Government Procurement, and the 
North American Free Trade Agreement (NAFTA), provide that EC and 
NAFTA construction materials are exempted from application of the 
Buy American Act.
    (c) The Contractor agrees that only domestic construction 
materials, NAFTA country construction materials or EC construction 
materials will be used by the Contractor, subcontractors, 
materialmen and suppliers in the performance of this contract, 
except for other foreign construction materials, if any, listed in 
this contract.

(End of clause)

    27. Section 52.225-17 is amended in the clause heading by revising 
the date to read ``(JAN 1994)''; in the definition ``Domestic end 
product'' by removing the last sentence; by removing the parenthetical 
following paragraph (c)(4); and by adding paragraph (d) to read as 
follows:

52.225-17  Buy American Act--Supplies under European Community 
Agreement.

* * * * *

Buy American Act--Supplies Under European Community Agreement (Jan 
1994)

* * * * *
    (d) If this contract contains the clause at 52.225-21, Buy 
American Act--North American Free Trade Agreement (NAFTA) 
Implementation Act--Balance of Payments Program, the Contractor may 
deliver NAFTA country end products, notwithstanding the prohibition 
in paragraph (c).

(End of clause)

    28. Section 52.225-19 is amended in the clause heading by revising 
the date to read ``(JAN 1994)''; and by revising paragraph (b) to read 
as follows:

52.225-19  European Community Sanction for Services.

* * * * * *

European Community Sanction for Services (Jan 1994)

* * * * *
    (b) Agreement. The Contractor agrees not to perform services 
under this contract in a sanctioned member state of the EC. This 
does not apply to subcontracts.

(End of clause)

    29. Sections 52.225-20 and 52.225-21 are added to read as follows:

52.225-20  Buy American Act--North American Free Trade Agreement 
Implementation Act--Balance of Payments Program Certificate.

    As prescribed in 25.408(a)(3), insert the following provision:

Buy American Act--North American Free Trade Agreement Implementation 
Act--Balance of Payments Program Certificate (Jan 1994)

    (a) The offeror hereby certifies that each end product, except 
those listed in paragraph (b) of this provision, is a domestic end 
product (as defined in the clause entitled ``Buy American Act--North 
American Free Trade Agreement (NAFTA) Implementation Act--Balance of 
Payments Program'') and that components of unknown origin have been 
considered to have been mined, produced, or manufactured outside the 
United States.
    (b) Excluded End Products:

------------------------------------------------------------------------
           Line item No.                      Country of origin         
------------------------------------------------------------------------
                                                                        
                                                                        
                           (List as necessary)                          
                                                                        
------------------------------------------------------------------------

    (c) Offers will be evaluated by giving certain preferences to 
domestic end products or NAFTA country end products over other end 
products. In order to obtain these preferences in the evaluation of 
each excluded end product listed in paragraph (b) of this provision, 
offerors must identify and certify below those excluded end products 
that are NAFTA country end products. Products that are not 
identified and certified below will not be deemed NAFTA country end 
products. Offerors must certify by inserting the applicable line 
item numbers in the following:
    (1) The offeror certifies that the following supplies qualify as 
``NAFTA country end products'' as that term is defined in the clause 
entitled ``Buy American Act--North American Free Trade Agreement 
Implementation Act--Balance of Payments Program:''

----------------------------------------------------------------------
(Insert line item numbers)

    (d) Offers will be evaluated in accordance with FAR part 25.

(End of provision)

52.225-21  Buy American Act--North American Free Trade Agreement 
Implementation Act--Balance of Payments Program.

    As prescribed in 25.408(a)(4), insert the following clause:

Buy American Act--North American Free Trade Agreement Implementation 
Act--Balance of Payments Program (Jan 1994)

    (a) Definitions. As used in this clause--
    Components means those articles, materials, and supplies 
incorporated directly into the end products.
    Domestic end product means (1) an unmanufactured end product 
mined or produced in the United States, or (2) an end product 
manufactured in the United States, if the cost of its components 
mined, produced, or manufactured in the United States exceeds 50 
percent of the cost of all its components. A component shall also be 
considered to have been mined, produced, or manufactured in the 
United States (regardless of its source in fact) if the end product 
in which it is incorporated is manufactured in the United States and 
the component is of a class or kind (i) determined by the 
Government, to be not mined, produced, or manufactured in the United 
States in sufficient and reasonably available commercial quantities 
of a satisfactory quality, or (ii) to which the agency head 
concerned has determined that it would be inconsistent with the 
public interest to apply the restrictions of the Buy American Act.
    End products means those articles, materials, and supplies to be 
acquired under this contract for public use.
    Foreign end product means an end product other than a domestic 
end product.
    North American Free Trade Agreement (NAFTA) country means Canada 
or Mexico.
    NAFTA country end product means an article that (1) is wholly 
the growth, product, or manufacture of a NAFTA country, or (2) in 
the case of an article which consists in whole or in part of 
materials from another country or instrumentality, has been 
substantially transformed in a NAFTA country into a new and 
different article of commerce with a name, character, or use 
distinct from that of the article or articles from which it was 
transformed. The term includes services (except transportation 
services) incidental to its supply; provided, that the value of 
those incidental services does not exceed that of the product 
itself. It does not include service contracts as such.
    (b) This clause implements the Buy American Act (41 U.S.C. 10), 
the North American Free Trade Agreement Implementation Act (Pub. L. 
103-182, 107 Stat. 2057), and the Balance of Payments Program by 
providing a preference for domestic end products over foreign end 
products, except for certain foreign end products which meet the 
requirements for classification as NAFTA country end products.
    (c) The Contracting Officer has determined that the NAFTA 
applies to this acquisition. Unless otherwise specified, the Act 
applies to all items in the schedule. The Contractor agrees to 
deliver under this contract only domestic end products unless, in 
its offer, it specifies delivery of foreign end products in the 
provision entitled ``Buy American Act--North American Free Trade 
Agreement Implementation Act--Balance of Payments Program 
Certificate.'' An offer certifying that a NAFTA country end product 
will be supplied requires the Contractor to supply a NAFTA country 
end product or, at the Contractor's option, a domestic end product.
    (d) If the contract contains the clause at 52.225-17, Buy 
American Act--Supplies under European Community Agreement, the 
Contractor may deliver EC country end products notwithstanding the 
provisions of paragraph (c).
    (e) Offers will be evaluated in accordance with the policies and 
procedures of subpart 25.4 of the Federal Acquisition Regulation.

(End of clause)

[FR Doc. 94-177 Filed 1-4-94; 8:45 am]
BILLING CODE 6820-34-M

Complete official Federal Register PDF

FR Doc. 94-147 Lake Wisconsin Viticultural Area (92F-017P)
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 537-540]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-147]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Bureau of Alcohol, Tobacco and Firearms

27 CFR Part 9

[T.D. ATF-352; RE: Notice No. 781]
RIN 1512-AA07

 

Lake Wisconsin Viticultural Area (92F-017P)

AGENCY: Bureau of Alcohol, Tobacco and Firearms (ATF), Treasury.

ACTION: Final rule, Treasury decision.

-----------------------------------------------------------------------

SUMMARY: This final rule establishes a viticultural area in Columbia 
and Dane Counties, Wisconsin, to be known as Lake Wisconsin. The 
petition was submitted by Mr. Charles W. Dean, Viticultural Area 
Consultant, on behalf of Wollersheim Winery located near Prairie-du-
Sac, Wisconsin. The establishment of viticultural areas and the 
subsequent use of viticultural area names as appellations of origin in 
wine labeling and advertising will help consumers better identify the 
wines they may purchase, and will help winemakers distinguish their 
products from wines made in other areas.

EFFECTIVE DATE: February 4, 1994.

FOR FURTHER INFORMATION CONTACT: Robert White, Wine and Beer Branch, 
Bureau of Alcohol, Tobacco and Firearms, 650 Massachusetts Avenue, NW., 
Washington, DC 20226, (202-927-8230).

SUPPLEMENTARY INFORMATION:

Background

    On August 23, 1978, ATF published Treasury Decision ATF-53 (43 FR 
37672, 54624) revising regulations in 27 CFR part 4. These regulations 
allow the establishment of definite American viticultural areas. The 
regulations also allow the name of an approved viticultural area to be 
used as an appellation of origin in the labeling and advertising of 
wine.
    On October 2, 1979, ATF published Treasury Decision ATF-60 (44 FR 
56692) which added a new part 9 to 27 CFR, providing for the listing of 
American viticultural areas. Section 4.25a(e)(l), title 27, CFR, 
defines an American viticultural area as a delimited grape-growing 
region distinguishable by geographical features, the boundaries of 
which have been delineated in subpart C of part 9. Section 4.25a(e)(2) 
outlines the procedure for proposing an American viticultural area. Any 
interested person may petition ATF to establish a grape-growing region 
as a viticultural area. The petition should include:
    (a) Evidence that the name of the proposed viticultural area is 
locally and/or nationally known as referring to the area specified in 
the petition;
    (b) Historical or current evidence that the boundaries of the 
viticultural area are as specified in the petition;
    (c) Evidence relating to the geographical characteristics (climate, 
soil, elevation, physical features, etc.) which distinguish the 
viticultural features of the proposed area from surrounding areas;
    (d) A description of the specific boundaries of the viticultural 
area, based on features which can be found on United States Geological 
Survey (U.S.G.S.) maps of the largest applicable scale; and
    (e) A copy of the appropriate U.S.G.S. map(s) with the proposed 
boundaries prominently marked.

Petition

    ATF received a petition from Mr. Charles W. Dean, Viticultural Area 
Consultant, on behalf of Robert P. Wollersheim and JoAnn I. 
Wollersheim, proprietors and landowners of Wollersheim Winery near 
Prairie-du-Sac, Wisconsin, to establish a viticultural area in south-
central Wisconsin to be known as ``Lake Wisconsin.'' The viticultural 
area is bounded by the shoreline of Lake Wisconsin and the Wisconsin 
River on the north and west. Wollersheim Winery is the sole winery 
located in the 28,000 acre viticultural area and there are currently 
twenty-three acres planted to wine grapes.

Notice of Proposed Rulemaking

    In response to Mr. Wollersheim's petition, ATF published a notice 
of proposed rulemaking, Notice No. 781, in the Federal Register on 
September 24, 1993 (58 FR 49949), proposing the establishment of the 
Lake Wisconsin viticultural area. The notice requested comments from 
all interested persons by October 25, 1993.

Comments to Notice of Proposed Rulemaking

    Seven comments were received concerning the proposal to establish 
the Lake Wisconsin viticultural area. All seven commenters stated that 
they fully support the proposed area as delineated in Notice No. 781. 
One of the commenters was under the mistaken impression that this area 
had been proposed to be called the Roxbury Viticultural District. 
However, despite the misunderstanding about the name, this commenter 
stated in his letter that he heartily supports the establishment of a 
new viticultural area in this part of Wisconsin which includes the 
Wollersheim Winery.

Viticultural Area Name

    The place-name ``Lake Wisconsin'' was first used ca. 1917 to 
describe a widened section of the Wisconsin River that was submerged 
when the Baraboo hydroelectric dam was constructed one mile upriver 
from the town of Prairie-du-Sac. A travel brochure and map produced by 
the Lake Wisconsin Chamber of Commerce in 1989, entitled Lake Wisconsin 
Chamber Recreation Area Vacationland, shows various recreational and 
tourist facilities in the Lake Wisconsin viticultural area. The 
viticultural area has a long history of wine grape growing and wine 
making activity. Agoston Haraszthy, an immigrant from Hungary well 
known as an early pioneer in the American wine industry, first planted 
wine grapes on Wollersheim Winery property in 1847. Cold winter 
temperatures frustrated this early attempt to establish grapevines and 
two years later Haraszthy moved to California. However, wine grape 
growing and wine making continued in this area until 1900. Because of 
its role in the early history of Wisconsin, Wollersheim Winery and the 
adjacent homestead were listed on the National Register of Historic 
Places in 1976.

Evidence of Boundaries

    The boundaries of the Lake Wisconsin viticultural area are clearly 
shown on two U.S.G.S. quadrangle maps, Sauk City, Wisc. and Lodi, Wisc. 
The Sauk City, Wisc. quadrangle map shows the viticultural area to be 
bounded by the shoreline of Lake Wisconsin and the Wisconsin River on 
the north and west. The southern boundary is defined by Mack Road and 
State Highway Y, and the eastern boundary, shown on the Lodi, Wisc. 
quadrangle map, follows State Highway Y, State Highway 60, State 
Highway 113, and Spring Creek. The petitioner states that some of the 
natural boundary features, which closely approximate some of the roads 
and highways used as boundaries for this viticultural area, can be 
found on county maps, plat maps and county atlases dating back to 1861.

Geographical Features

    The Wisconsin River (of which Lake Wisconsin is a part) is a major 
natural feature of the State and of the region. It is the largest river 
in the State after the Mississippi River, of which it is a major 
tributary. Roads and highways define the southern boundary of the Lake 
Wisconsin viticultural area. The landscape of the viticultural area is 
comprised of discontinuous end moraines interspersed with ground 
moraines and occasional outwash plains. The landscape outside the 
southern boundary is of higher elevation and is comprised of rolling, 
hummocky upland with some outwash material. The eastern boundary, which 
closely approximates Spring Creek, identifies an area of low relief, 
continuous and intermittent stream drainage, and marsh. To the east of 
Spring Creek and outside the viticultural area is a glaciated upland 
plain where the landscape is generally of higher elevations and 
comprised of end moraines with little or no outwash material.

Topography and Elevation

    The vineyards in the viticultural area are located at an elevation 
of 800-900 feet along south and southwest facing slopes of 10-40 
percent gradient. This combination of elevation, aspect, and relief 
contributes to the well-drained quality of the vineyard soils, the free 
circulation of air in summer and winter, and the locally longer growing 
season. Outside the viticultural area to the north and west, higher 
elevations of 900-1,200 feet increase the risk of wind damage to 
grapevines, or the soils become too shallow for successful grape 
cultivation where bedrock is nearer the surface or exposed. Outside the 
viticultural area to the east, elevations between 720 feet (Wisconsin 
River level) and 800 feet are generally less well drained or are 
saturated during periods of rainfall or snowmelt.

Climate

    The Lake Wisconsin viticultural area benefits from the microclimate 
effects of the lower Wisconsin River valley. The river moderates winter 
temperatures in the viticultural area several degrees higher than areas 
north and west of the river or further south. Air circulation within 
the river valley helps prevent cold air accumulation and frost pockets 
from forming in the vineyards. In summer, the river valley and 
limestone bluffs along the river's edge serve to channel air currents 
and increase localized air circulation, protecting the vineyards from 
mildew and rot in hot, humid weather.
    The viticultural area has a mean precipitation of twenty-nine 
inches, one inch less than the average rainfall in the area north and 
east, three inches less than the average rainfall in the area to the 
west, and two inches less than the State average. The petitioner 
describes the viticultural area as an ``island'' of locally below-
average rainfall and drier soils conducive to the grapevines 
concentrating their vigor in ripening fruit. The viticultural area has 
a growing season of 140-160 days, ten to twenty days longer than across 
the river to the west and to the north. The additional frost-free 
period allows the grapes to reach maturity before the onset of winter 
cold.

Soil

    The Wisconsin River forms an approximate dividing line between the 
glaciated and unglaciated regions of south-central Wisconsin. Soils 
primarily of glacial till and outwash material are found east of the 
river valley and characterize the soils in the viticultural area. The 
unglaciated ``driftless'' soils west of the valley result from 
significant differences in soil parent materials, microrelief, and 
drainage. The soils that support viticulture within the viticultural 
area are Typic Hapludalfs of mixed mineral material and silty or loamy 
texture. All are underlain by gravelly or sandy loam glacial till or by 
dolomitic bedrock. The soils are typically well drained and about 36-60 
inches deep on slopes and rolling areas of 2-45 percent gradient. The 
soils outside the viticultural area to the north and west are 
predominately unglaciated, and so are not underlain by glacial till and 
contain less outwash material. The soils outside the area to the south 
and east, although glacially derived, are found on topography of 
rolling upland with fewer limestone outcrops and no outwash plains. The 
soils there have formed on slightly higher elevations over 
discontinuous end and ground moraines.

Viticultural Area Boundary

    The boundary of the Lake Wisconsin viticultural area may be found 
on two United States Geological Survey (U.S.G.S.) maps with a scale of 
1:24,000. The boundary is described in Sec. 9.146.

Executive Order 12866

    It has been determined that this rule is not a significant 
regulatory action, because
    (1) It will not have an annual effect on the economy of $100 
million or more or adversely affect in a material way the economy, a 
sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local or tribal 
governments or communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
Executive Order 12866.

Regulatory Flexibility Act

    It is hereby certified that this regulation will not have a 
significant economic impact on a substantial number of small entities. 
The establishment of a viticultural area is neither an endorsement nor 
approval by ATF of the quality of wine produced in the area, but rather 
an identification of an area that is distinct from surrounding areas. 
This process merely allows wineries to more accurately describe the 
origin of their wines to the consumers, and helps consumers identify 
the wines they purchase. Designation of a viticultural area itself has 
no significant economic impact because any commercial advantage can 
come only from consumer acceptance of wines made from grapes grown 
within the area. In addition, no new recordkeeping or reporting 
requirements are imposed. Accordingly, a regulatory flexibility 
analysis is not required.

Paperwork Reduction Act

    The provisions of the Paperwork Reduction Act of 1980, Public Law 
96-511, 44 U.S.C. Chapter 35, and its implementing regulations, 5 CFR 
Part 1320, do not apply to this final rule because no requirement to 
collect information is imposed.

Drafting Information

    The principal author of this document is Robert White, Wine and 
Beer Branch, Bureau of Alcohol, Tobacco and Firearms.

List of Subjects in 27 CFR Part 9

    Administrative practice and procedure, Consumer protection, 
Viticultural areas, and Wine.

Authority and Issuance

    Accordingly, Title 27, Code of Federal Regulations, part 9, 
American Viticultural Areas, is amended as follows:

PART 9--AMERICAN VITICULTURAL AREAS

    Paragraph 1. The authority citation for part 9 continues to read as 
follows:

    Authority: 27 U.S.C. 205.

    Par. 2. Subpart C is amended by adding Sec. 9.146 to read as 
follows:

Subpart C--Approved American Viticultural Areas

Sec. 9.146  Lake Wisconsin.

    (a) Name. The name of the viticultural area described in this 
section is ``Lake Wisconsin.''
    (b) Approved maps. The appropriate maps for determining the 
boundary of the ``Lake Wisconsin'' viticultural area are two U.S.G.S. 
7.5 minute series topographical maps of the 1:24,000 scale. They are 
titled:
    (1) ``Sauk City, Wis.,'' 1975; and
    (2) ``Lodi, Wis.,'' 1975.
    (c) Boundary. The Lake Wisconsin viticultural area is located in 
Columbia and Dane Counties, Wisconsin. The boundary is as follows:
    (1) The point of beginning is on the ``Lodi, Wisc.'' U.S.G.S. map 
in the northeast quarter-section of section 17, Lodi Township, Columbia 
County, where Spring Creek enters Lake Wisconsin;
    (2) From the point of beginning, follow the southern shoreline of 
Lake Wisconsin northwest to where Lake Wisconsin narrows and becomes 
the Wisconsin River on the map, in the vicinity of the town of 
Merrimac, Sauk County;
    (3) Then continue along the southern shoreline of the Wisconsin 
River, west and south past Goose Egg Hill, Columbia County, on the 
``Sauk City, Wisc.'' quadrangle map, and then west to a southwest bend 
in the shoreline opposite Wiegands Bay, Sauk County, where the 
Wisconsin River becomes Lake Wisconsin again on the map;
    (4) Then southwest and south along the eastern shoreline of Lake 
Wisconsin, to the powerplant that defines where Lake Wisconsin ends and 
the Wisconsin River begins again;
    (5) Then continuing south along the Wisconsin River shoreline to 
where it intersects with U.S. Highway 12 opposite Sauk City, Sauk 
County;
    (6) Then in a southeasterly direction on U.S. Highway 12 to the 
intersection at State Highway 188, just over one-half a mile;
    (7) Then in a northeasterly direction about 1,000 feet on State 
Highway 188, to the intersection of Mack Road;
    (8) Then east on Mack Road to the intersection of State Highway Y, 
about 3 miles;
    (9) Then follow State Highway Y in a generally northeasterly 
direction onto the ``Lodi, Wisc.'' quadrangle map and continue in a 
northeasterly direction to the intersection with State Highway 60;
    (10) Then in a northeasterly direction on State Highway 60 to the 
intersection with State Highway 113 in the town of Lodi;
    (11) Then in a northwesterly direction on State Highway 113 to 
where it crosses Spring Creek the second time just before Chrislaw 
Road;
    (12) Then follow Spring Creek in a northwesterly direction to where 
it enters Lake Wisconsin, the point of beginning.

    Dated: November 24, 1993.
Daniel R. Black,
Acting Director.
    Approved: December 17, 1993.
John P. Simpson,
Deputy Assistant Secretary, (Regulatory, Tariff and Trade Enforcement).
[FR Doc. 94-147 Filed 1-4-94; 8:45 am]
BILLING CODE 4810-31-U

Complete official Federal Register PDF

FR Doc. 94-131 Modifications to Fitness-For-Duty Program Requirements
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 502-507]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-131]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

10 CFR Part 26

RIN 3150-AE38

 

Modifications to Fitness-For-Duty Program Requirements

AGENCY: Nuclear Regulatory Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Nuclear Regulatory Commission (NRC) is amending its 
regulations governing fitness-for-duty (FFD) programs that are 
applicable to licensees who are authorized to construct or operate 
nuclear power reactors and to licensees authorized to possess, use, or 
transport formula quantities of strategic special nuclear material 
(SSNM). The amendment permits licensees to reduce the random testing 
rate for all persons covered by the fitness-for-duty regulations to an 
annual rate equal to 50 percent.

EFFECTIVE DATE: January 1, 1994.

ADDRESSES: Copies of the regulatory analysis, the comments received, 
and the Government Accounting Office (GAO) report (GAO/GGD-93-13) of 
November 1992 may be examined at the NRC Public Document Room, 2120 L 
Street NW, (Lower Level), Washington, DC.
    Copies of NUREG-1354, NUREG/CR-5758 (Volumes 1, 2, and 3), and 
NUREG/CR-5784 may be purchased from the Superintendent of Documents, 
U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20013-
7082. Copies are also available from the National Technical Information 
Service, 5282 Port Royal Road, Springfield, VA 22161. A copy is 
available for inspection and/or copying for a fee in the NRC Public 
Document Room, 2120 L Street NW, (Lower Level), Washington, DC.

FOR FURTHER INFORMATION CONTACT: Loren L. Bush, Jr., Safeguards Branch, 
Division of Radiation Safety and Safeguards, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555, 
telephone: (301) 504-2944.

SUPPLEMENTARY INFORMATION:

Background

    The NRC has reviewed experiences gained since publication of the 
current FFD rule on June 7, 1989 (54 FR 24468), and implementation by 
power reactor licensees on January 3, 1990, and determined that it may 
be appropriate to modify the random testing rate. Accordingly, on March 
24, 1993 (58 FR 15810), the Commission published a proposed 
modification to the FFD rule that would permit a reduction in the 
random testing rate for licensee employees, but maintain the 100-
percent random testing rate for contractors and vendors.

Summary of Public Comments

    The comment period expired on June 22, 1993. Forty comment letters 
were received. Twenty-eight were from power reactor licensees, six from 
unions, one from an industry association, one from a vendor, three from 
licensed reactor operators, and one from a private citizen. There was 
overwhelming support for the proposed reduction in the annual rate of 
random testing for licensee employees. Most of the commenters believed 
that the reduced rate also should apply to contractors and vendors, and 
several commenters proposed a flexible, performance-based rate. There 
was no support for excluding from any reduction in the random testing 
rate certain positions critical to the safe operation of a nuclear 
power plant, such as licensed reactor operators. A summary of the 
comments received and the NRC's responses are presented below.
    1. Comment. The random testing rate for licensee employees should 
be reduced to 50 percent.
    All of the 23 commenters submitting comments on the Commission's 
proposed reduction of the random testing rate to 50 percent for 
licensee employees supported the proposal. The reason most often 
expressed was the low rate of positive random test results experienced 
by licensee employees, particularly in comparison with other industries 
having significant safety concerns. These commenters believe that this 
low industry-wide positive rate justifies the lowering of the random 
testing rate to 50 percent. Some commenters stated that a 50-percent 
rate for licensee employees would make that rate consistent with the 
random testing rate currently required in the substance abuse programs 
mandated for entities regulated by the agencies within the Department 
of Transportation (DOT), including the Federal Aviation Administration 
and the Federal Highway Administration. They also noted that DOT is 
currently considering lowering its proposed random testing rate below 
50 percent even though Federal Highway Administration data, for 
example, indicate a significantly higher positive rate than that 
experienced among NRC licensee employees. Another commenter pointed out 
that the lowered random testing rate for licensee employees subject to 
the NRC's FFD rule also would be consistent with the random rate 
applied in the Commission's own internal drug testing program.
    Other commenters supported the reduction with the expectation of 
significant cost savings for licensees as a result of only testing 
approximately one-half the number of employees now being tested. In 
this regard, the Nuclear Management and Resources Council (NUMARC) made 
reference to the November 1992 GAO report, ``Employee Drug Testing: 
Opportunities Exist To Lower Drug-Testing Program Costs'' (GAO/GGD-93-
13), which suggests reduced random testing rates as a means of 
producing cost efficiencies in Federally mandated drug testing programs 
without adversely affecting program integrity.
    Concerning the relative effectiveness of alternative random testing 
rates, some commenters believe that a 50-percent random testing rate 
would produce satisfactory deterrence of drug and alcohol abuse. This 
is particularly true in light of the fact that other FFD program 
elements, such as program awareness training and behavioral 
observation, and the access authorization program will continue to 
inhibit such behavior. Two commenters also supported the proposed 
change because it would lessen the disruption of workers lives and 
reduce the invasion of privacy that random drug testing creates.

NRC Response

    The NRC concurs with those commenters who stated that a 50-percent 
random testing rate as applied to licensee employees can be expected to 
provide sufficient deterrence to justify lowering the rate at this 
time. It also agrees with the observation that the access authorization 
program and other FFD program elements, such as policy communications 
and awareness training, behavioral observation, for-cause testing, 
employee assistance programs, and the imposition of strict sanctions 
for violations of an FFD policy will continue to deter drug and alcohol 
abuse by most of the workforce. As some commenters noted, requiring 
fewer tests of licensee employees should decrease the privacy invasion 
experienced by some employees. It also should result in cost savings 
across the industry by reducing lost work hours and the number of tests 
to be administered.
    The Commission recognizes that positive results in the nuclear 
power industry's random testing are generally among the lowest of any 
U.S. industry. Nonetheless, it realizes that there are many variables 
that can affect the rate of positive testing results and that 
relatively low positive test results, by themselves, are not the only 
indicator of the effectiveness of a testing program either on an 
industry-wide or a licensee program level. Some of the variables that 
could affect the testing results are the propensity of the population 
being tested to use drugs and alcohol, the effectiveness of other 
program elements, and the extent to which tested employees have been 
successful in subverting the testing process and avoiding detection.
    The NRC does not have sufficient information about these or other 
factors that may influence testing results to be able to determine that 
the decreasing positive rates reported by licensees are an unqualified 
indication of FFD program effectiveness. Nonetheless, the Commission is 
gratified to observe the decreasing positive rates in licensee 
employees' random test results during the past three years. The 
recently published NUREG/CR-5758, Volume 3, ``Fitness for Duty in the 
Nuclear Power Industry: Annual Summary of Program Performance 
Reports,'' indicates that licensee employees' positive random testing 
rate in 1992 was 0.20 percent as compared to 0.28 percent in 1990 and 
0.22 percent in 1991. There also have been decreasing positive rates 
for random testing of contractor and vendor personnel, viz., 0.56 
percent in 1990, 0.55 percent in 1991, and 0.45 percent in 1992.
    In making its decision, the Commission has considered these testing 
results along with the apparent continuing strength of the other 
elements of most licensees' FFD programs, the reduced invasion of 
employees' privacy interests, and the potential for cost savings. In 
light of this industry experience and of these beneficial effects, the 
Commission has concluded that it is reasonable at this time to lower 
the random testing rate for licensee employees and contractor and 
vendor personnel to 50 percent. The response to Comment 4 discusses the 
Commission's reasons for allowing reduction in the random testing rate 
for contractor and vendor personnel.
    2. Comment. The random testing rate should be reduced to less than 
50 percent.
    Four commenters recommended that the random testing rate be reduced 
to less than 50 percent. The rates they recommended varied from 5 
percent to 25 percent. Their central argument was that the random 
testing rate can be lowered substantially without threatening the 
effectiveness of the program. The very low rates of drug and alcohol 
positive tests that have been recorded by the nuclear industry during 
the first two years of FFD program operations are the basis for their 
recommendation. One licensee stated that most chronic drug users 
probably have been eliminated and currently there is not a serious drug 
or alcohol abuse problem in the industry. This commenter and NUMARC 
also cited the GAO study that found that the percentage of positives 
does not vary significantly among Federal agency drug testing programs, 
regardless of what random rate is used. Another licensee emphasized 
that behavioral observation, not random testing, is the most potent 
tool in detecting drug abuse. Another commenter recommended that the 
NRC consider further reductions because the effectiveness of other 
program elements makes a random rate of even 50 percent unnecessarily 
high.
    Significant cost savings was given as the most compelling reason to 
reduce the random rate below 50 percent. One licensee estimated the 
industry would save up to $30 million annually without degradation of 
the overall program.

NRC Response

    As stated in the response to Comment 1 above, positive random 
testing results are not, by themselves, the only indicator of the FFD 
program's effectiveness in detecting substance abuse. The NRC does not 
have sufficient information about the many variables that could affect 
testing results to be able to determine that a lower random testing 
rate would maintain an acceptable level of program effectiveness. 
Therefore, the Commission believes that the industry's relatively low 
numbers of drug and alcohol positive random test results should not be 
used as the sole justification for lowering the random testing rate 
below 50 percent. While behavorial observation and for-cause testing 
are valuable program elements, there still must be a strong random 
testing program that provides an adequate level of detection and 
deterrence. The Commission continues to believe that it must choose a 
conservative and prudent random testing rate that maximizes both 
detection and deterrence of substance abuse while minimizing the 
monetary and social costs of such testing. The Commission believes that 
a 50-percent random testing rate will strike the proper balance between 
the dictates of public health and safety, the financial needs of 
licensees, and the privacy and other interests of workers subject to 
the testing requirement. Given the substantial unknowns currently 
associated with the true detection and deterrence effectiveness of 
alternative random testing rates as applied to the particular 
conditions of the nuclear power industry workforce, the Commission 
believes that it cannot establish a random testing rate lower than 50 
percent for any segment of the industry at this time.
    It should also be noted that relatively low positive test rates do 
not necessarily indicate that there is not a drug and alcohol abuse 
problem, as some commenters asserted. First, some users have become 
adept at avoiding detection, and the use of increasingly effective 
subversion techniques may be one reason why random testing results are 
decreasing. Second, while it may be that most of the chronic drug users 
who were in the industry when the program started have been detected or 
have left, there can be expected to be a continuing level of 
intermittent illegal drug use and alcohol abuse among industry 
employees; such use is difficult to detect. The Commission concludes 
that the low positive random test results do not indicate that there 
has ceased to be a drug and alcohol abuse problem and that further 
reduction in the random testing rate would not be appropriate at this 
time.
    In response to the commenters' reference to the GAO's observation 
that the percentage of positives does not vary significantly among 
Federal agency drug testing programs, the NRC notes that the GAO's 
objective in that report was to identify potential cost savings in 
Federal employee drug testing programs. Its objective did not include 
determination of the relative deterrent values of alternative random 
testing rates. In accomplishing its objective, the GAO properly 
concentrated on only the costs associated with Federal employee drug 
testing. It did not perform an indepth analysis of the several 
variables that influence testing results nor of the very complex 
relationship between those variables and the deterrence value of 
testing. Such variables would include the inclination for drug or 
alcohol abuse among the employees in the various industries in which 
the Federal testing programs operate, the extent to which the strength 
and effectiveness of other, non-testing program elements, such as drug 
awareness training, may affect testing results, and the relative 
stringency of sanctions imposed by the various Federal agencies 
following positive test results. Because the GAO's objective was to 
address the cost rather than the deterrence effectiveness of testing, 
the NRC does not consider the commenter's reference to the GAO's 
observation to be a persuasive argument for reduced random testing 
rates.
    The NRC will continue to monitor implementation of the rule and 
will modify the rule in response to industry experience, advances in 
technology, or other considerations to ensure that the rule is 
achieving the general performance objectives set forth in 10 CFR Part 
26.
    3. Comment. The random testing rate should be flexible and based on 
performance, such as the positive rate of random testing.
    Twelve commenters recommended that the Commission allow some form 
of performance-based approach to determine the random testing rate. 
Under such a system, the random testing rate would vary over time. This 
would depend on each licensee's or, alternatively, the industry's 
positive random test results from a previous period. One licensee, for 
example, suggested that each licensee's random testing rate should be 
based upon that particular licensee's previous 12-month testing 
results. Under this approach, a licensee would be subject to a minimum 
50-percent random testing rate if it experienced a positive rate of 
greater than 0.50 percent during the previous 12 months. That licensee 
could reduce its random rate to 25 percent if it subsequently had a 12-
month positive rate between 0.25 percent and 0.50 percent or to as low 
as 10 percent if its positive rate for the previous year was less than 
0.25 percent. Three other licensees recommended similar schemes whereby 
a licensee's random rate would be determined by its own record of 
positive test results. One of these recommendations based the rate on 
the results of the previous 2 years rather than those of the previous 
12 months.
    NUMARC proposed that the industry-wide random testing rate be 
determined by the industry-wide random testing results from the 
previous period. This recommendation was endorsed by five licensees. 
Under NUMARC's proposed approach, the industry would be allowed by 
regulation to adjust its random testing rate based on testing results 
from the previous reporting period. All licensees would be required to 
test at a 100-percent random rate if the industry-wide positive rate 
were greater than 1.0 percent in the previous period, at a 50-percent 
random rate if the positive rate was between 0.50 percent and 1.0 
percent, at a 25-percent random rate if the positive rate was between 
0.25 percent and 0.50 percent, and at a 10-percent random rate if the 
positive rate was less than 0.25 percent. Two of the eleven licensees 
favoring a performance-based testing system provided a general 
recommendation that did not specify whether the random testing rate 
should be based on the positive testing results of each individual 
licensee, or on the results of the industry as a whole.
    The commenters noted various potential advantages of adopting a 
performance-based approach to setting the random testing rate. One 
stated that adopting such an approach would be consistent with the 
NRC's initiative to identify performance-based programs that would be 
beneficial to the industry. Another listed cost savings, equity in that 
each licensee's random rate would be commensurate with its program 
performance, and an incentive for licensees to maximize program 
conformance with the FFD rule as advantages of such an approach.

NRC Response

    During development of 10 CFR part 26 in 1989, the Commission 
considered a variation of the flexible, performance-based random rate 
similar to the approaches recommended by these commenters. (See, for 
example, the NRC's response to Comment 7.4.2 in NUREG-1354, ``Fitness 
for Duty in the Nuclear Power Industry: Responses to Public 
Comments.'') At that time, the Commission decided against adopting a 
performance-based rate for various reasons. As stated above, positive 
random testing results are not the only indicator of detection and 
deterrence effectiveness or of overall random testing program 
performance to allow the testing rate to vary with testing results. 
Adopting a performance-based approach would tend to discourage the 
initiatives that the Commission is encouraging in 10 CFR 26.24(b) and 
in Section 2.1 of Appendix A to Part 26. In Sec. 26.24(b), the NRC 
allows licensees to implement programs with more stringent standards, 
for example, lower screening and confirmation cutoff levels and a 
broader panel of drugs than those specified in the rule. In Section 2.1 
of Appendix A, licensees are permitted to test for any illegal drugs 
during a for-cause test or analysis of specimens suspected of being 
adulterated or diluted. Program performance data for the first three 
years of FFD program implementation have shown that those licensees 
using screening cutoff levels for marijuana that are lower than the 
maximum allowed 100 nanograms per milliliter (ng/ml) have had a higher 
percentage of confirmed positive results than those screening at 100 
ng/ml. (See NUREG/CR-5758, Vols. 1-3.) Licensees that employ special 
measures to detect attempts to dilute specimens or flush metabolites 
from the body report that their positive rate is about doubled. This 
result is similar to data presented to the Department of Health and 
Human Services' Drug Testing Advisory Board on June 10, 1993, and 
reported in ``The National Report on Substance Abuse'' on June 18, 
1993. (The study is currently undergoing peer review before 
publication.) Adopting a performance-based approach that allowed 
licensees to reduce their random testing rates as positive testing 
results declined would likely discourage licensees from adopting lower 
screening cutoff levels and taking measures to detect attempts by users 
to avoid detection.
    Lastly, a performance-based approach would require the collection 
and analysis of performance data to provide the bases for adjustments 
to the random testing rate. Such data is not currently collected by the 
licensees or the NRC. Previous efforts known to the NRC staff to 
identify and analyze the many candidate performance indicators for 
measuring the effectiveness of random testing have been inconclusive, 
primarily because of the numerous variables. Furthermore, assuming that 
the proper performance indicators can be developed, it would appear 
that the collection and analysis of data to support a performance-based 
approach would add a considerable administrative burden to both 
licensees and the NRC.
    For all these reasons and until further experience is gained that 
would support a performance-based approach, the Commission declines to 
adopt such an approach to setting the random testing rate.
    4. Comment. The reduction in the random testing rate should be 
applied to all workers.
    Four of the 30 commenters on this issue--three unions and one 
licensee--supported the Commission's proposal that licensees maintain 
the 100-percent random testing rate for contractor and vendor 
employees. Their reasons included a concern for lack of commitment by 
contractor employees to maintaining the industry's high drug-free 
standard and the need for the higher testing rate to provide continued 
deterrence for contractor employees. One of the three unions 
recommended that long-term contractors should have the same lower 
random testing rate as that of licensee employees because test results 
of long-term contractors and licensee employees have been almost 
identical.
    There were several issues consistently mentioned by those 26 
commenters who opposed maintaining the 100-percent random testing rate 
for contractor and vendor employees. There was a general concern for 
unnecessary inconsistencies in random testing rates between Federal 
agencies. Commenters recommended that the NRC program be kept as 
consistent as possible with programs in other Federally regulated 
safety-related industries. These include the DOT programs that 
currently require contractors and vendors to be randomly tested at a 
50-percent rate.
    Various licensees cited the testing results from 1990 and 1991 
which, in their opinion, create no statistically sound rationale for 
testing contractor and vendor employees at a rate different from that 
of licensee employees. They argued that, while the contractor/vendor 
positive testing rate has been twice that of licensee employees, it is 
still low enough to make unnecessary the expenditure of the resources 
necessary to maintain two separate random testing pools.
    Various commenters noted that contractors and vendors are subject 
to the identical access authorization and other FFD program 
requirements as are licensee employees, including behavioral 
observation. These stringent requirements, in their view, obviate the 
need to keep the contractor/vendor random rate at 100 percent. Some 
also noted that the deterrent value of random testing is in the act of 
testing itself and not in what many consider to be a high rate of 
testing. Some commenters warned that keeping contractors and vendors at 
100 percent could be construed as discriminatory against those 
employees and may be perceived as punitive rather than as a corrective 
measure. Two licensees also cited a study of the detection 
effectiveness of nine random testing rates published in NUREG/CR-5784, 
``Fitness for Duty in the Nuclear Power Industry: A Review of the First 
Year of Program Performance and an Update of the Technical Issues,'' 
which indicates that a 100-percent testing rate is only a little more 
effective than a 50-percent rate for detecting occasional drug users.

NRC Response

    Although there is a difference between the positive results of 
random testing of licensee employees and those of contractor and vendor 
employees, the positive random testing rate of both groups has been 
less in each year since 1990, as stated in the response to Comment 1 
above. While the contractor/vendor random testing positive rates 
continue to be about twice the rate for licensee employees and 
statistical analysis of the data shows that the difference in 
proportion between the contractors' and licensees' employees is not 
explained within statistical fluctuations (therefore, differences in 
the rates are statistically significant), the Commission agrees that 
the absolute numbers of positive test results of all categories of 
nuclear power workers are low. Therefore, the Commission will permit 
its licensees to lower the random testing rate to 50 percent for all 
persons covered by 10 CFR part 26. However, the Commission will 
continue to monitor licensee program performance and effectiveness and 
will make program adjustments as necessary.
    In response to the comments regarding the study of the detection 
effectiveness of nine random testing rates published in NUREG/CR-5784, 
the Commission notes that the study explicitly dealt with only the 
hypothetical detection effectiveness of those alternatives. It did not 
address their relative deterrence effectiveness. While it may be that 
the effectiveness of a 100-percent random testing rate for deterring 
occasional drug users could be slightly higher than that of a 50-
percent rate, the Commission nonetheless believes that a 50-percent 
random testing rate will provide sufficient deterrence to drug and 
alcohol abuse by contractor and vendor employees.
    With respect to commenters' concerns about unnecessary 
inconsistencies in random testing rates between Federal agencies, the 
Commission continues to believe that the random test rate for employees 
in the nuclear power industry need not be similar to the rates applied 
to employees in all, or even most, other Federal agencies or Federally 
mandated programs. Not all Federal agencies have identical safety 
concerns or responsibilities.
    5. Comment. There should be no difference in the random testing 
rate for certain positions critical to the safe operation of a nuclear 
power plant.
    Seventeen commenters responded to the Commission's question as to 
whether certain positions critical to the safe operation of a nuclear 
power plant, such as licensed reactor operators, should be excluded 
from any reduction of the random testing rate. All these commenters 
recommended against such differentiation. Two licensees stated that 
treating people in positions critical to safety differently from other 
employees could have a negative effect on the morale, self-image, and 
motivation of this group of highly trained and dedicated specialists. 
Another stated that all plant employees are critical to safe operation. 
Therefore, a reduction in the random testing rate should apply to all 
employees. The potential for added record-keeping requirements creating 
unnecessary burdens for the industry was another reason for not making 
this distinction. In the opinion of one commenter, the 1990-1992 
industry-wide program performance data do not support testing people in 
positions critical to safety at a different rate than that applied to 
other licensee employees. Finally, one licensee cited potential 
problems getting union agreement to testing this classification of 
employees at a higher rate than other licensee personnel subject to the 
FFD rule.

NRC Response

    The essence and unanimity of these comments--that licensed 
operators and other employees in positions critical to the safe 
operation of a nuclear power plant should not be excluded from a 
reduction of the random testing rate--is not surprising. These 
particular members of the nuclear power industry's workforce have 
collectively demonstrated their dedication to safe and efficient plant 
operations. As at least one commenter noted, the industry's program 
performance data for the first three years of operation do not support 
differentiating between people in safety-critical positions and other 
licensee employees insofar as the random testing rate is concerned. The 
1992 program performance data, for example, show that eighteen of the 
industry's approximately 5,000 licensed operators tested positive for 
drugs or alcohol or otherwise violated the licensee's FFD policy; 
twelve of these were a result of random testing. When comparing these 
results to the 461 positive results out of 156,730 random tests 
administered to the industry workforce, the difference in proportion 
between the licensed operators and the industry workforce is within 
statistical fluctuations and the difference in the positive rates is 
not statistically significant. While the NRC expects licensees to 
continue to take action to drive this number of positives down even 
further, this record does not merit testing people in these positions 
at a rate different from that applied to other licensee employees. The 
Commission, therefore, concurs with the commenters' recommendation that 
certain positions critical to the safe operation of a nuclear power 
plant, such as licensed reactor operators, should not be excluded from 
a reduction of the random testing rate.
    6. Comment. Random testing is expensive and produces false 
positives. Furthermore, chronic users are able to avoid detection.
    Two commenters, a power plant worker and a union, argued against 
the usefulness of continued random testing. One of these commenters 
stated that random testing produces false positives. These cost the 
industry large amounts of money in settlements and damage the public's 
perception of licensees' fairness. As additional support for this 
position, this commenter warned that chronic drug abusers are 
particularly adept at escaping detection from random testing by 
subverting the testing process. The other commenter recommended that 
random testing be eliminated because it is not effective in identifying 
workers who are impaired at the time urine samples are collected. For-
cause testing, in this commenter's opinion, is more effective because 
it more accurately reflects a worker's present ability to perform his/
her job at the time he/she is tested. This commenter also stated that 
random testing appears to be a means of having the NRC enforce the 
Controlled Substances Act which is not the NRC's responsibility.

NRC Response

    The Commission has long been well aware of the types of FFD 
program-related concerns as addressed by these commenters. During the 
promulgation of 10 CFR part 26 in 1989, the Commission fully addressed 
these and many other such concerns. (See NUREG-1354, ``Fitness for Duty 
in the Nuclear Power Industry: Responses to Public Comments.'') At that 
time the NRC concluded, for example, that licensee FFD programs should 
be concerned not only with impairment, but also with worker reliability 
and trustworthiness. The NRC believes that any illegal drug use or 
alcohol abuse by a worker reflects upon his or her trustworthiness and 
reliability. Likewise, random testing is not intended, nor has it ever 
functioned, as a means to enforce the Controlled Substances Act. 
Section 26.29(b) provides that licensees, contractors, and vendors 
shall not disclose test results to law enforcement officials unless 
those officials request such information under court order. It also is 
noted that there is no requirement to routinely provide such officials 
with testing results.
    The Commission is well aware that there is a potential for false 
positive results and, therefore, has required numerous quality control 
measures and safeguards to prevent such occurrences. In Appendix D to 
NUREG/CR-5758, Volume 3, the testing process errors that were reported 
by licensees during the first three years under the FFD rule were 
analyzed. Of over 800,000 specimens tested, there were two false 
positives of personnel specimens reported by the laboratories, both due 
to administrative errors. In both cases, the quality assurance programs 
detected and corrected the problem.
    Because of the NRC's particular concern with the degree to which 
the testing process can be subverted, the Commission staff has 
continued to track the ways in which workers have subverted testing 
processes in industries across the country. These efforts have resulted 
in staff recommendations for amending 10 CFR part 26 to introduce 
various means for combatting subversion. Lastly, the Commission 
believes that the added protection of public health and safety that the 
FFD program provides is well worth the industry's costs of 
administering this program.
    7. Comment. Maintaining two separate populations of workers for 
random testing is an unnecessary and expensive burden.
    Some of the commenters stated that requiring two random testing 
rates would force licensees to develop two separate testing programs. 
The resulting additional administrative and financial burdens would 
cancel out any savings resulting from reducing the licensee employee 
rate to 50 percent. NUMARC stated that the industry would save 
approximately $4.1 million if the number of tests of contractor and 
vendor employees was cut in half.

NRC Response

    Some of the comments noted above asserted that separate random 
testing rates for licensee employees and contractors/vendors would 
create additional administrative and financial burdens for licensees. 
Although this issue is somewhat moot since the Commission will permit 
licensees to reduce the random testing rate to 50 percent per year for 
all persons covered by Part 26, the Commission does not concur that 
conducting random testing using two random rates would have caused 
appreciably higher administrative or operating costs. Presumably, most 
licensees' data bases already distinguish between licensee employees 
and contractor/vendor employees subject to testing. Numerous commenters 
on the initial rule in 1989 indicated that the workforce population 
should be separated so that permanent employees would not be tested at 
a much higher rate to make up for contractors who might not be on site 
when selected for testing (see comment/response 7.4.3 of NUREG-1354). 
The NRC staff understands that several licensees have divided their 
testing population as permitted by the rule. The number and identity of 
licensee employees in the testing pool remains rather constant over 
time. The number and identity of contractor/vendor employees in the 
testing pool, on the other hand, varies quite considerably over time 
depending on outages and other operational considerations. A licensee 
may choose to create more than one test population so that it may test 
portions of its workforce at a greater rate or reduce the burden on its 
employees from being tested at a higher rate to compensate for the 
testing of contractors and vendors not normally on site.
    8. Comment. The Commission should modify certain portions of 10 CFR 
part 26 based on industry experience and lessons learned and 
incorporate numerous program enhancements as discussed at various 
industry forums.
    Eight commenters recommended that the Commission make future 
modifications to certain portions of 10 CFR part 26 based on industry 
experience and lessons learned and incorporate numerous program 
enhancements as discussed at various industry forums.

NRC Response

    The specific recommendations for ways in which part 26 can be 
improved and numerous other program enhancements are currently being 
considered by the NRC in conjunction with a general package of rule 
revisions currently under development.

Environmental Impact: Categorical Exclusion

    The NRC has determined that this final rule is the type of action 
described in categorical exclusion 10 CFR 51.22(c)(2). Therefore, the 
NRC has not prepared an environmental impact statement, nor an 
environmental assessment for this final rule.

Paperwork Reduction Act Statement

    This final rule amends information collection requirements that are 
subject to the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) 
These requirements and amendments were approved by the Office of 
Management and Budget, approval number 3150-0146.
    Since the rule will permit licensees to reduce the random testing 
rate for their employees, the resulting reduction in the reporting and 
recordkeeping burden is expected to be an average of 223 hours per 
site, including the time for reviewing instructions, searching existing 
data sources, gathering and maintaining the data needed, and completing 
and reviewing the collection of information. Send comments regarding 
this burden estimate or any other aspect of this collection of 
information, including suggestions for reducing this burden, to the 
Information and Records Management Branch (MNBB-7714), U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001, and to the Desk 
Officer, Office of Information and Regulatory Affairs, NEOB-3019 (3150-
0146), Office of Management and Budget, Washington, DC 20503.

Regulatory Analysis

    The NRC has prepared a regulatory analysis for this regulation. The 
analysis examines the costs and benefits of the alternatives considered 
by the Commission. The analysis is available for inspection in the NRC 
Public Document Room, 2120 L Street NW (Lower Level), Washington, DC. 
Single copies of the analysis may be obtained from Loren L. Bush, Jr., 
Division of Radiation Safety and Safeguards, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555, 
telephone (301) 504-2944.

Regulatory Flexibility Act Certification

    In accordance with the Regulatory Flexibility Act of 1980 (5 U.S.C. 
605(b)), the Commission certifies that this rule will not have a 
significant economic impact on a substantial number of small entities. 
This rule affects only the licensing and operation of nuclear power 
plants and activities associated with the possession or transportation 
of Category I material. The companies that own these plants do not fall 
within the scope of the definition of ``small entities'' set forth in 
the Regulatory Flexibility Act or the Small Business Size Standards 
issued by the Small Business Administration in 13 CFR part 121.

Backfit Analysis

    The rule represents a relaxation from current part 26 requirements 
for drug testing since the rule permits (but does not require) 
licensees to reduce the random testing rate for all persons covered by 
the rule. Accordingly, the rule does not represent a backfit as defined 
in 10 CFR 50.109(a)(1), and a backfit analysis is not required for this 
rule.

List of Subjects in 10 CFR Part 26

    Alcohol abuse, Alcohol testing, Appeals, Chemical testing, Drug 
abuse, Drug testing, Employee assistance programs, Fitness for duty, 
Hazardous materials transportation, Management actions, Nuclear 
materials, Nuclear power plants and reactors, Penalties, Protection of 
information, Radiation protection, Reporting and recordkeeping 
requirements, Sanctions, Special nuclear materials.

    For the reasons set out in the preamble and under the authority of 
the Atomic Energy Act of 1954, as amended, the Energy Reorganization 
Act of 1974, as amended, and 5 U.S.C. 552 and 553, the NRC is adopting 
the following amendment to 10 CFR part 26.

PART 26--FITNESS FOR DUTY PROGRAMS

    1. The authority citation for part 26 continues to read as follows:

    Authority: Secs. 53, 81, 103, 104, 107, 161, 68 Stat. 930, 935, 
936, 937, 939, 948, as amended (42 U.S.C. 2073, 2111, 2112, 2133, 
2134, 2137, 2201); secs. 201, 202, 206, 88 Stat. 1242, 1244, 1246, 
as amended (42 U.S.C. 5841, 5842, 5846).

    2. In Sec. 26.24 paragraph (a)(2) is revised to read as follows:

Sec. 26.24  Chemical and alcohol testing

    (a) * * *
    (2) Unannounced drug and alcohol tests imposed in a statistically 
random and unpredictable manner so that all persons in the population 
subject to testing have an equal probability of being selected and 
tested. The tests must be administered so that a person completing a 
test is immediately eligible for another unannounced test. As a 
minimum, tests must be administered on a nominal weekly frequency and 
at various times during the day. Random testing must be conducted at an 
annual rate equal to at least 50 percent of the workforce.
* * * * *
    Dated at Rockville, Maryland, this 29th day of December, 1993.

    For the Nuclear Regulatory Commission.
John C. Hoyle,
Acting Secretary of the Commission.
[FR Doc. 94-131 Filed 1-4-94; 8:45 am]
BILLING CODE 7590-01-P

Complete official Federal Register PDF

FR Doc. 94-119 Arkansas' Abandoned Mine Land Reclamation Plan
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 540-542]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-119]

[[Page Unknown]]

[Federal Register: January 5, 1994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Office of Surface Mining Reclamation and Enforcement

30 CFR Part 904

 

Arkansas' Abandoned Mine Land Reclamation Plan

AGENCY: Office of Surface Mining Reclamation and Enforcement (OSM), 
Interior.

ACTION: Final rule; approval of amendment.

-----------------------------------------------------------------------

SUMMARY: OSM is approving an amendment to the Arkansas abandoned mine 
land reclamation plan (hereinafter referred to as the ``Arkansas 
plan'') under the Surface Mining Control and Reclamation Act of 1977 
(SMCRA). The amendment consists of revisions to the Arkansas statute 
pertaining to the eligibility of project sites for abandoned mined land 
(AML) funds. The amendment is intended to revise the Arkansas plan to 
be in compliance with SMCRA.

EFFECTIVE DATE: January 5, 1994.

FOR FURTHER INFORMATION CONTACT:
James H. Moncrief, Telephone: (918) 581-6430.

SUPPLEMENTARY INFORMATION:

I. Background on the Arkansas Plan
II. Submission of Amendment
III. Director's Findings
IV. Summary and Disposition of Comments
V. Director's Decision
VI. Procedural Determinations

I. Background on the Arkansas Plan

    On May 2, 1983, the Secretary of the Interior approved the Arkansas 
plan. General background information on the Arkansas plan, including 
the Secretary's findings, the disposition of comments, and the approval 
of the Arkansas plan can be found in the May 2, 1983, Federal Register 
(48 FR 19710).

II. Submission of Amendment

    By letter dated October 6, 1993 (Administrative Record No. AAML-
18), Arkansas submitted a proposed amendment to its plan pursuant to 
SMCRA. Arkansas submitted the proposed amendment in response to a 
required program amendment at 30 CFR 904.26(a) that was placed on the 
Arkansas plan when OSM approved Arkansas' March 31, 1993, plan 
amendment (58 FR 38532, July 19, 1993; Administrative Record No. AAML-
17). Arkansas intended that this amendment be in compliance with 
section 402 of SMCRA.
    Arkansas proposed to amend Arkansas Code Annotated (ACA) 15-58-
401(b)(2) that provides criteria for the determination of the 
eligibility of certain project sites for AML funding. Specifically, 
Arkansas proposed to require at ACA 15-58-401(b)(2) a finding that the 
surface coal mining operation occurred during the period beginning on 
August 4, 1977, and ending on November 5, 1990.
    OSM announced receipt of the proposed amendment in the November 1, 
1993, Federal Register (58 FR 58313; Administrative Record No. AAML-25) 
and in the same notice opened the public comment period and provided an 
opportunity for a public hearing on the substantive adequacy of the 
proposed amendment. The public comment period closed on December 1, 
1993. No substantive comments were received. The public hearing, 
scheduled for November 26, 1993, was not held because no one requested 
an opportunity to testify.

III. Director's Findings

    After a thorough review pursuant to SMCRA and the Federal 
regulations at 30 CFR 884.14 and 884.15, the Director finds, as 
discussed below, that Arkansas' October 6, 1993, proposed plan 
amendment is in compliance with SMCRA.
    OSM required at 30 CFR 904.26(a) that Arkansas submit a revision to 
ACA 15-58-401(b)(2) to limit operations eligible for AML funds because 
of insolvency of a surety company to those operations whose surety 
became insolvent during the time frame provided by section 
402(g)(4)(B)(ii) of SMCRA. Section 402(g)(4)(B)(ii) of SMCRA, as 
revised by the Abandoned Mine Land Reclamation Act of 1990 (Pub. L. 
101-508), provided that the period of time during which such an 
operation would be eligible for AML funds because of the insolvency of 
the surety company would begin on August 4, 1977, and end on the date 
of enactment of the revision to SMCRA, which was November 5, 1990. 
Because Arkansas revised ACA 15-58-401(b)(2) to specify a period of 
time beginning on August 4, 1977, and ending on November 5, 1990, ACA 
15-58-401(b)(2) is no less stringent than section 402(g)(4)(B)(ii) of 
SMCRA, as revised by the Abandoned Mine Land Reclamation Act of 1990.
    Therefore, the Director approves ACA 15-58-401(b)(2) and removes 
the required amendment at 30 CFR 904.26(a).

IV. Summary and Disposition of Comments

1. Public Comments

    The Director solicited public comments and provided an opportunity 
for a public hearing on the proposed amendment. No public comments were 
received, and because no one requested an opportunity to testify at a 
public hearing, no hearing was held.

2. Agency Comments

    Pursuant to 30 CFR 884.14(a)(2) and 884.15(a), the Director 
solicited comments from the heads of various other Federal agencies 
with an actual or potential interest in the Arkansas plan.
    By letter dated October 29, 1993, (Administrative Record No. AAML-
22), the U.S. Bureau of Mines responded that it had no comments.
    By letter dated October 29, 1993 (Administrative Record No. AAML-
23), the U.S. National Park Service (NPS) responded that the proposed 
amendment would not impact NPS program responsibilities.
    By letter dated November 8, 1993 (Administrative Record No. AAML-
24), the U.S. Bureau of Land Management responded with a recommendation 
that Arkansas be required to revise ACA 15-58-401(c) so that it would 
read as follows:

    In determining which sites to reclaim pursuant to paragraph (b) 
of this section, the Director shall follow the priorities stated in 
paragraphs (1) and (2) of 15-58-402. The Director shall ensure that 
priority is given to those sites which are in the immediate vicinity 
of a residential area or which have an adverse economic impact upon 
a community [once coal mining sites and toxic mining material sites 
on federal or state surface tracts have been reclaimed].

    BLM proposed the addition of the bracketed language and stated that 
its intent was to protect the public interest as a whole, particularly 
in the Ouachita National Forest, prior to focusing in on individual 
communities.
    Referenced ``paragraph (b) of this section'' in ACA 15-58-401, as 
revised by the amendment that is the subject of this notice, allows the 
reclamation under Arkansas' plan of certain surface coal mining 
operations that operated on or after August 7, 1977, and were abandoned 
or left in an inadequate reclamation status.
    Referenced ``paragraphs (1) and (2) of 15-58-402'' require that the 
expenditure of AML funds reflect the priorities of (1) the protection 
of public health, safety, general welfare, and property from extreme 
danger of adverse effects of coal mining practices and (2) the 
protection of public health, safety, and general welfare from adverse 
effects of coal mining practices. These State provisions are 
substantively identical to sections 403(a) (1) and (2) of SMCRA.
    ACA 15-58-401(c) is substantively identical to section 402(g)(4)(C) 
of SMCRA. In addition, section 411 of SMCRA provides for the use of AML 
funds for lands affected by noncoal mining only after a State has 
certified that all abandoned coal mines have been reclaimed. Arkansas 
has not yet made this certification.
    OSM cannot, as requested by BLM, require that Arkansas give higher 
priority to the reclamation of coal mining sites and toxic mining 
material sites on federal or state surface tracts because sections 
403(a), 402(g)(4)(C), and 411 of SMCRA do not do so.

V. Director's Decision

    Based on the above finding, the Director approves Arkansas' 
proposed plan amendment, as submitted on October 6, 1993.
    The Federal regulations at 30 CFR part 904, codifying decisions 
concerning the Arkansas plan, are being amended to implement this 
decision. This final rule is being made effective immediately to 
expedite the State plan amendment process and to encourage States to 
bring their plans into conformity with the Federal standards without 
undue delay. Consistency of State and Federal standards is required by 
SMCRA.

VI. Procedural Determinations

1. Executive Order 12866

    This final rule is exempted from review by the Office of Management 
and Budget (OMB) under Executive Order 12866 (Regulatory Planning and 
Review).

2. Executive Order 12778

    The Department of the Interior has conducted the reviews required 
by section 2 of Executive Order 12778 (Civil Justice Reform) and has 
determined that this rule meets the applicable standards of subsections 
(a) and (b) of that section. However, these standards are not 
applicable to the actual language of State abandoned mine land 
reclamation plans and revisions thereof since each such plan is drafted 
and promulgated by a specific State, not by OSM. Decisions on proposed 
State AML reclamation plans and revisions thereof submitted by a State 
are based on a determination of whether the submittal meets the 
requirements of Title IV of SMCRA (30 U.S.C. 1231-1243) and the 
applicable Federal regulations at 30 CFR parts 884 and 888.

3. National Environmental Policy Act

    No environmental impact statement is required for this rule since 
agency decisions on proposed State abandoned mine land reclamation 
plans and revisions thereof are categorically excluded from compliance 
with the National Environmental Policy Act of 1969 (42 U.S.C. 4332) by 
the Manual of the Department of the Interior (516 DM 6, appendix 8, 
paragraph 8.4B(29)).

4. Paperwork Reduction Act

    This rule does not contain information collection requirements that 
require approval by OMB under the Paperwork Reduction Act (44 U.S.C. 
3507 et seq.).

5. Regulatory Flexibility Act

    The Department of the Interior has determined that this rule will 
not have a significant economic impact on a substantial number of small 
entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). 
The State submittal which is the subject of this rule is based upon 
Federal regulations for which an economic analysis was prepared and 
certification made that such regulations would not have a significant 
economic effect upon a substantial number of small entities. 
Accordingly, this rule will ensure that existing requirements 
established by SMCRA or previously promulgated by OSM will be 
implemented by the State. In making the determination as to whether 
this rule would have a significant economic impact, the Department 
relied upon the data and assumptions in the analyses for the 
corresponding Federal regulations.

List of Subjects in 30 CFR Part 904

    Intergovernmental relations, Surface mining, Underground mining.

    Dated: December 28, 1993.
Raymond L. Lowrie,
Assistant Director, Western Support Center.

    For the reasons set out in the preamble, title 30, chapter VII, 
subchapter T of the Code of Federal Regulations is amended as set forth 
below:

PART 904--ARKANSAS

    1. The authority citation for part 904 continues to read as 
follows:

    Authority: 30 U.S.C. 1201 et seq.

    2. Section 904.25 is amended by adding paragraph (b) to read as 
follows:

Sec. 904.25  Approval of abandoned mine land reclamation plan 
amendments.

* * * * *
    (b) The following section of the Arkansas Code Annotated, title 15, 
pertaining to the Arkansas abandoned mine land reclamation plan, as 
submitted to OSM on October 6, 1993, is approved effective January 5, 
1994.

    Section 15-58-401(b)(2) of Arkansas Code Annotated--Lands 
Eligible.

    3. Section 904.26 is revised to read as follows:

Sec. 904.26  Required plan amendments.

    Pursuant to 30 CFR 884.15, Arkansas is required to submit for OSM's 
approval the following proposed plan amendment by the date specified.
    (a) [Reserved]
    (b) [Reserved]

[FR Doc. 94-119 Filed 1-4-94; 8:45 am]
BILLING CODE 4310-05-M

Complete official Federal Register PDF

FR Doc. 93-32115 Airworthiness Directives; Honeywell Traffic Alert and Collision Avoidance System II Computer Units, as Installed on Various Transport Category Airplanes
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 511-514]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 93-32115]

[[Page Unknown]]

[Federal Register: January 5, 1994]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 93-NM-68-AD; Amendment 39-8786; AD 94-01-04]

 

Airworthiness Directives; Honeywell Traffic Alert and Collision 
Avoidance System II Computer Units, as Installed on Various Transport 
Category Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD), 
applicable to all Honeywell Traffic Alert and Collision Avoidance 
System II (TCAS II) computer units installed on various transport 
category airplanes, that requires replacing certain TCAS II computer 
units with new units that incorporate updated collision avoidance 
system (CAS) logic, and modifying the computer surveillance logic. This 
amendment is prompted by the development of candidate enhancements to 
TCAS II logic that will improve its utility and increase its overall 
operational acceptance. The actions specified by this AD are intended 
to prevent collisions or near misses caused by incompatibility between 
the TCAS II processors and the current air traffic control system.

DATES: Effective February 4, 1994.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of February 4, 1994.

ADDRESSES: The service information referenced in this AD may be 
obtained from Honeywell Inc., Commercial Flight Systems Group, Air 
Transport Systems Division, P.O. Box 21111, Phoenix, Arizona 85036. 
This information may be examined at the Federal Aviation Administration 
(FAA), Transport Airplane Directorate, Rules Docket, 1601 Lind Avenue, 
SW., Renton, Washington; at the FAA, Transport Airplane Directorate, 
Los Angeles Aircraft Certification Office, 3229 East Spring Street, 
Long Beach, California; or at the Office of the Federal Register, 800 
North Capitol Street, NW., suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Abby Malmir, Aerospace Engineer, 
Systems and Equipment Branch, ANM-132L, FAA, Transport Airplane 
Directorate, Los Angeles Aircraft Certification Office, 3229 East 
Spring Street, Long Beach, California 90806-2425; telephone (310) 988-
5351; fax (310) 988-5210.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations to include an airworthiness directive (AD) that is 
applicable to all Honeywell Traffic Alert and Collision Avoidance 
System II (TCAS II) computer units installed on various transport 
category airplanes was published in the Federal Register on September 
9, 1993 (58 FR 47407). That action proposed to require replacing 
certain TCAS II computer units with new units that incorporate updated 
collision avoidance system (CAS) logic, and modifying the computer 
surveillance logic.
    Since the issuance of the notice, an additional change to Version 
6.04A collision avoidance system (CAS) logic was recommended at a 
meeting held to discuss the progress made in implementing logic 
modification 6.04A. Meeting attendees included representatives from the 
FAA and European civil aviation authorities, U.S. and European aviation 
industry, and U.S. operators. The logic change that was recommended 
involves reducing unnecessary crossing resolution advisories (RA). That 
change is included in a new enhanced software package (identified as 
Version 6.04A), specified in Mitre letter F046-L-0069, dated September 
21, 1993.
    Subsequently, Honeywell Inc. has issued Service Bulletin 4066010-
34-SW16, dated December 20, 1993. The service bulletin describes 
procedures for converting certain TCAS II computer units to new units 
(Version 6.04A). The new units incorporate all of the logic changes 
specified in the preamble to the notice, including updating CAS logic, 
modifying the computer surveillance logic to ensure that these units 
accommodate Mode C altitude input of 100-foot increments, and ensuring 
that the system will be tracked and coordinated by intruding aircraft 
when the Mode S transponder CA field is set at CA=7. The conversion is 
onboard-loadable, or it may be accomplished at a field repair shop. The 
first method involves data loading the TCAS II computer unit in the 
aircraft equipment bay using an ARINC 615 or 603 data loader. The 
second method entails performing a final test, and then programming the 
TCAS II computer unit to convert it to the latest enhanced version at a 
field repair shop.
    The notice proposed that operators accomplish the modification 
requirements of this AD in accordance with a method approved by the 
FAA. However, the FAA has reviewed and approved the Honeywell service 
bulletin discussed previously, and has determined that accomplishment 
of this service bulletin is an appropriate method of compliance. 
Consequently, the FAA has revised paragraph (a) of the final rule to 
cite the Honeywell service bulletin as the appropriate source of 
service information, and has removed the language referring to 
accomplishing the actions ``in accordance with a method approved by the 
FAA.'' Even though this language has been deleted from paragraph (a), 
operators may still be permitted to accomplish the actions in 
accordance with an FAA-approved method under the provisions of 
paragraph (c) of the final rule.
    In light of this new data and software developement, the FAA has 
revised the final rule by changing the reference to Mitre letter F046-
L-0056, dated July 20, 1993, which appeared in paragraph (a)(1) of the 
NPRM, to Mitre letter F046-L-0069, dated September 21, 1993, since the 
latter identifies the enhanced software package. Since the original 
Version 6.04A software was never issued, no operator could have 
installed that version. Therefore, no redundant actions would be 
required on the part of any operator as a result of this change.
    Since the enhanced Version 6.04A software introduces a change in 
the operation of the aircraft, the FAA also finds that a revision to 
the Airplane Flight Manual (AFM) is necessary as a conforming change to 
correspond with that new software configuration. The AFM revision is 
advisory only, and will ensure that the flight crew is aware of the 
changes associated with the new software installation. Consequently, 
paragraph (b) has been added to the final rule to reflect this 
informational AFM revision.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received in response to the notice:
    One commenter, Honeywell, objects to the proposed compliance date 
of December 30, 1993, and states that December 31, 1994, represents a 
more realistic compliance timeframe. Honeywell indicates that operators 
vary in their ability to load the updated software due to maintenance 
and aircraft schedules and data-load/test resources. Honeywell states 
that, although it has been working aggressively to implement the latest 
change, that change has resulted in a delay in the date operators will 
be able to implement the latest change.
    Several other commenters also request that the FAA extend the 
proposed compliance date from 3 to 18 months after the date specified 
in the proposal in order to accommodate implementation, verification, 
certification, and incorporation of the proposed software change into 
existing installations. One commenter, the Air Transport Association 
(ATA) of America, supports implementation of the latest enhanced 
Version 6.04A, and requests that the FAA issue a supplemental notice of 
proposed rulemaking (NPRM) to propose that this revised software be 
retrofitted by June 30, 1995. ATA contends that significant differences 
exist between Version 6.04A and the latest enhanced version. Another 
commenter requests that the FAA solicit comments from foreign agencies 
participating in TCAS evaluation and simulations to help ensure that 
the proposed Version 6.04A revision will be compatible and acceptable.
    The FAA concurs partially with these requests to extend the 
compliance time. The FAA has considered the safety implications, the 
time necessary for approval of the enhanced Version 6.04A software, the 
size of the fleet, and normal maintenance schedules for timely 
accomplishment of implementation of the modification. In light of these 
considerations, the FAA has determined that a compliance date of 
December 31, 1994, is appropriate. Paragraph (a) of the final rule has 
been revised to specify the revised compliance date.
    However, in response to the requests that a supplemental NPRM be 
issued and that further public comments be solicited, the FAA submits 
the following. Comments received in response to the proposal reflect 
unanimous support for implementation of the latest enhanced Version 
6.04A software. The FAA considers the logic change (reduction of 
unnecessary crossing RA's) incorporated in the enhanced software to be 
a minor change. The intent of this AD is to require that the addressed 
unsafe condition be corrected by installing modified TCAS II computer 
units that incorporate updated CAS logic. The FAA has determined that a 
requirement to implement Version 6.04A software, including the latest 
enhancement, will meet that intent, will not alter the substance of the 
rule, and will impose no additional burden on any member of the public. 
Additionally, issuance of a supplemental NPRM would necessitate (under 
the provisions of the Administrative Procedure Act) reissuing the 
notice, reopening the period for public comment, considering additional 
comments received, and eventually issuing a final rule; the time 
required for that procedure may be as long as four additional months. 
In light of this, and in consideration of the amount of time that has 
already elapsed since issuance of the original NPRM, the FAA concludes 
that solicitation of further public comment is not necessary and that 
further delay of this final rule action is not appropriate.
    One commenter requests that the FAA require Honeywell TCAS II 
processors that are already installed be operated in the ``traffic 
advisory (TA) only'' mode until the updated software package is 
installed. The commenter indicates that ``possible hidden problems'' 
could exist between the different versions of logic that are installed 
currently in the TCAS II processors.
    The FAA does not concur with the commenter's request. Operation of 
currently installed TCAS II processors in the ``TA only'' mode would 
impair the capability of those processors to alert the flight crew of 
appropriate aircraft maneuvers that must be taken to prevent mid-air 
collisions. Further, the FAA is unaware of any ``possible hidden 
problems'' between the different versions of logic installed currently 
in the TCAS II processors, as suggested by the commenter. Therefore, 
the FAA concludes that currently installed TCAS II processors should 
not be operated in the ``TA only'' mode until the updated software 
packaged is installed.
    One commenter requests clarification of the unsafe condition 
specified in the proposed rule. This commenter points out differences 
in the wording of the unsafe condition between this proposed rule and 
two existing proposals that address the same CAS logic change for 
Rockwell International/Collins Air Transport Division (Collins), and 
Allied Signal Aerospace Company/Air Transport Avionics (Allied Signal), 
TCAS II processors. From this comment, the FAA infers that the 
commenter requests that the proposed statement of unsafe condition more 
closely parallels the statement of unsafe condition in the other two 
proposals addressing the same subject.
    The FAA concurs. The FAA has revised the unsafe condition specified 
in this final rule to coincide with the proposals that address Collins 
and Allied Signal TCAS II processors to more explicitly reference 
safety considerations, as follows: ``* * * to prevent collisions or 
near misses caused by incompatibility between the TCAS II processors 
and the current air traffic control system.''
    One commenter, Falcon Jet Corporation, indicates that Honeywell 
TCAS II processors are installed on Mystere-Falcon Model 50 and 900 
series airplanes, and requests that these airplanes be included in the 
portion of the applicability of the AD that lists airplanes on which 
this TCAS II processor may be installed. The FAA concurs with the 
commenter's request and has revised the final rule accordingly. In 
addition, the FAA has become aware of other airplane models affected by 
this AD and has included those models in that portion of the 
applicability statement of the final rule. The FAA clarifies that, as 
stated in the preamble and the applicability of the proposal, the 
affected Honeywell TCAS II processors are installed on various 
transport category airplanes and are not limited only to those 
airplanes listed in the applicability of this AD.
    Several commenters request that the FAA revise the economic impact 
information specified in the proposal to reflect costs borne by 
suppliers, installers, and airline operators associated with 
development, testing, and certification of the modified processor.
    The FAA does not concur with the commenters' request to revise the 
economic impact information contained in this AD. The appropriate 
number of hours required to accomplish the required actions, specified 
as 3 in the economic impact information, below, was provided to the FAA 
by the processor manufacturer based on the best data available to date. 
This number represents the time required to gain access, remove the 
existing processor, install a diskette containing the revised software, 
and close up. The cost analysis in AD rulemaking actions typically does 
not include costs associated with development, testing, and 
certification of a modified processor, as suggested by the commenter.
    After careful review of the available data, including the comments 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule with the changes previously 
described. The FAA has determined that these changes will neither 
increase the economic burden on any operator nor increase the scope of 
the AD.
    There are approximately 2,700 transport category airplanes in the 
worldwide fleet on which the Honeywell TCAS II computer units may be 
installed. The FAA estimates that 1,150 airplanes of U.S. registry will 
be affected by this AD, that it will take approximately 3 work hours 
per airplane to accomplish the required actions, and that the average 
labor rate is $55 per work hour. Required parts will be supplied by the 
manufacturer at no cost to operators. Based on these figures, the total 
cost impact of the AD on U.S. operators is estimated to be $189,750, or 
$165 per airplane. This total cost figure assumes that no operator has 
yet accomplished the requirements of this AD.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends 14 CFR part 
39 of the Federal Aviation Regulations as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C. 
106(g); and 14 CFR 11.89.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

94-01-04  Honeywell: Amendment 39-8786. Docket 93-NM-68-AD.

    Applicability: Traffic Alert and Collision Avoidance System 
(TCAS) II computer units; part numbers 4066010-901, -902, and -903; 
as installed on, but not limited to, the following airplanes, 
certificated in any category:

Airbus Industrie Model A300-600, A310-200, A310-300, A320-200, and 
A340 series airplanes;
Boeing Model 727-100 and -200; 737-100, -200, -300, and -400; 747-
100, -200, -300, -400 and 747SP; 757-200 and -500; and 767-200 and -
300 series airplanes;
Cessna Citation Model C550 and C560 series airplanes, and Cessna 
Citation III and VII series airplanes;
Canadair Challenger Model CL-600-2B16 and -2A12 series airplanes;
British Aerospace Model 125-800A;
Gulfstream Model GII, GIIB, GIII, and GIV series airplanes;
Lockheed Model L-1011 series airplanes;
McDonnell Douglas Model DC-9-10, -20, -30-, -40, and -50; DC-10-10, 
-15, -30, and -40; MD-11; and DC-9-80 series airplanes; and Model 
MD-88 airplanes;
Dassault Aviation Model Mystere-Falcon 50 and 900 series airplanes;
Short Brothers Model SD3-60 series airplanes;
de Havilland Model DHC-8-100 and DHC-7 series airplanes;
Fokker Model F27 series airplanes; and
Corporate Jets Limited Model BAe 125-800A and BAe 125-1000A series 
airplanes.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent collisions or near misses caused by incompatibility 
between the TCAS II processors and the current air traffic control 
system, accomplish the following:
    (a) Before December 31, 1994, accomplish the requirements of 
paragraphs (a)(1) and (a)(2) of this AD in accordance with Honeywell 
Service Bulletin 4066010-34-SW16, dated December 20, 1993.
    (1) Remove existing Honeywell TCAS II computer units, part 
numbers 4066010-901, -902, and -903, and replace those units with 
new units that incorporate updated collision avoidance system (CAS) 
logic, identified as Version 6.04A in Mitre letter F046-L-0069, 
dated September 21, 1993.
    (2) Modify the computer surveillance logic on Honeywell TCAS II 
computer units, part numbers 4066010-901, -902, and -903, to ensure 
that these units accommodate Mode C altitude input of 100-foot 
increments and that the system will be tracked and coordinated by 
intruding aircraft when the Mode S transponder CA field is set at 
CA=7.
    (b) Prior to further flight after accomplishing the requirements 
of paragraph (a) of this AD, revise the Airplane Flight Manual (AFM) 
or AFM Supplement by accomplishing either paragraph (b)(1) or (b)(2) 
of this AD.
    (1) Revise the Normal Procedures Section of the AFM to include 
the appropriate TCAS operating characteristic relative to the 
modifications required by paragraph (a) of this AD, in accordance 
with a method approved by the Manager, Los Angeles Aircraft 
Certification Office (ACO), FAA, Transport Airplane Directorate; or
    (2) Revise the Normal Procedures Section of the AFM to include 
the following TCAS operating characteristic relative to the 
modification required by paragraph (a) of this AD. This may be 
accomplished by inserting a copy of this AD in the AFM or AFM 
Supplement.
    ``All Resolution Advisory (RA) and Traffic Advisory (TA) aural 
messages are inhibited at a radio altitude of less than 1,100 feet 
above ground level (AGL) climbing, and less than 900 feel AGL 
descending.''
    (c) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Los Angeles Aircraft Certification 
Office (ACO), FAA, Transport Airplane Directorate. Operators shall 
submit their requests through an appropriate FAA Principal Avionics 
Inspector, who may add comments and then send it to the Manager, Los 
Angeles ACO.

    Note: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Los Angeles ACO.

    (d) Special flight permits may be issued in accordance with FAR 
21.197 and 21.199 to operate the airplane to a location where the 
requirements of this AD can be accomplished.
    (e) The replacement and modification shall be done in accordance 
with Honeywell Service Bulletin 4066010-34-SW16, dated December 20, 
1993. This incorporation by reference was approved by the Director 
of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR 
part 51. Copies may be obtained from Honeywell Inc., Commercial 
Flight Systems Group, Air Transport Systems Division, P.O. Box 
21111, Phoenix, Arizona 85036. Copies may be inspected at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, 
Washington; at the FAA, Transport Airplane Directorate, Los Angeles 
Aircraft Certification Office, 3229 East Spring Street, Long Beach, 
California; or at the Office of the Federal Register, 800 North 
Capitol Street, NW., suite 700, Washington, DC.
    (f) This amendment becomes effective on February 4, 1994.

    Issued in Renton, Washington, on December 29, 1993.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 93-32115 Filed 12-30-93; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 93-32114 Airworthiness Directives: Rockwell International, Collins Air Transport Division, Traffic Alert and Collision Avoidance System II Processors
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 514-516]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 93-32114]

[[Page Unknown]]

[Federal Register: January 5, 1994]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 93-CE-47-AD; Amendment 39-8788; AD 94-01-06]

 

Airworthiness Directives: Rockwell International, Collins Air 
Transport Division, Traffic Alert and Collision Avoidance System II 
Processors

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD) that 
applies to certain Rockwell International, Collins Air Transport 
Division (Collins), Traffic Alert and Collision Avoidance System (TCAS) 
II processors that are installed on aircraft. This action requires 
replacing the existing TCAS II processor with a new processor that 
incorporates updated computer logic or reprogramming certain processors 
while they are still on board the aircraft. The development of 
candidate enhancements to TCAS II logic that improves its utility and 
increases its overall operational acceptance prompted the proposed 
action. The actions specified by this AD are intended to prevent 
collisions or near misses caused by incompatibility between the TCAS II 
processors and the current air traffic control system.

EFFECTIVE DATE: February 4, 1994.

ADDRESSES: Service information that is referenced in this AD may be 
obtained from Rockwell International/Collins Air Transport Division, 
400 Collins Road, NE; Cedar Rapids, Iowa 52498. Information that 
relates to this AD may be examined at the Federal Aviation 
Administration (FAA), Central Region, Office of the Assistant Chief 
Counsel, room 1558, 601 E. 12th Street, Kansas City, Missouri 64106.

FOR FURTHER INFORMATION CONTACT: Mr. Roger A. Souter, Aerospace 
Engineer, Wichita Aircraft Certification Office, 1801 Airport Road, 
room 100, Mid-Continent Airport, Wichita, Kansas 67209; telephone (316) 
946-4134; facsimile (316) 946-4407.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations to include an AD that applies to certain Collins 
TCAS II processors that are installed on aircraft was published in the 
Federal Register on September 9, 1993 (58 FR 47409). The action 
proposed to require (1) removing from service all processors that do 
not have computer logic ``Change 6.04A'' incorporated; and (2) 
mandatory incorporation of ``Change 6.04A'' into the TCAS II computer 
system.
    The affected TCAS II processors are not designed for a specific 
aircraft type. The Collins TCAS II processors are installed on, but not 
limited to the following:

General Aviation Airplanes

Astra Model 1125 airplanes
BAC Model 1-11 airplanes
British Aerospace Model 125-800 airplanes
Beech Models C90A, B200, 300, 350, and 400A airplanes
Canadair Models CL-600, CL-600-2B16, CL-601, CL-601-1A, and CL-601-
3A airplanes
Learjet Models 31, 55, and 60 airplanes
Falcon Models 20, 50, 200, and 900 airplanes
Gulfstream Models G2 and G3 airplanes
British Aerospace Models HS-125-700 airplanes and
Sabreliner Model 60 airplanes

Air Transport Airplanes

Aerospatiale Models ATR-42 and ATR-72 airplanes
Airbus Industries Models A300B2, A-300B, and A-320 airplanes
British Aerospace Models ATP and 146 airplanes
Boeing Models 707, 727, 737, 747, 757, and 767 airplanes
British Aerospace/Aerospatiale Model Concorde SST airplanes
de Havilland DHC-7 and DHC-8 series airplanes
McDonnell Douglas Models DC-8, DC-9, DC-10, MD-80, and MD-11 
airplanes
Ilyushin Model IL-86 airplanes
Lockheed Model L-1011 airplanes
SAAB Models SF340A and SF340B airplanes and
Shorts Models SD3-60-300 airplanes

    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received from 31 different owners, operators, 
manufacturers, and organizations.
    All commenters express their concern of the FAA's compliance date 
of December 30, 1993. The following summarizes the compliance times 
that the commenters recommended:
     21 recommended one year or less;
     3 recommended longer than one year; and
     7 recommended an extension without a proposed time.

The National Air Traffic Controllers Association and the Airline Pilots 
Association both recommend an ``aggressive implementation'' of ``Change 
6.04A''. The FAA has re-evaluated the December 30, 1993, compliance 
time and has determined that the compliance time should be changed to 
December 31, 1994. In addition, ``Change 6.04A'' has been upgraded to 
``Change 6.04A Enhanced'', which eliminates unnecessary non-crossing 
resolution advisories (RA's) included in ``Change 6.04A''. Collins has 
assured the FAA that (1) the upgrade to ``Change 6.04A Enhanced'' is 
minor and will be incorporated in the logic change for the TCAS II 
processor upgrades; and (2) this compliance time correlates with their 
schedule for disseminating service information and kits necessary to 
accomplish the incorporation of ``Change 6.04A Enhanced''. The proposed 
AD has been changed to reflect the compliance time change and logic 
change described above.
    One commenter states that the affected aircraft operators should 
operate their TCAS II units in the ``TA Mode Only'' until the new logic 
is incorporated because of possible hidden problems that could exist 
between different logic versions currently installed. The FAA does not 
concur that these TCAS II units should be operated in the ``TA Mode 
Only''. The information provided by an RA may prove to be useful to the 
pilot. The pilot has the option of whether to utilize the RA 
information. The proposed AD is unchanged as a result of this comment.
    A commenter recommends referencing Collins Service Bulletin (SB) 
No. 16, TTR-920-34-16, dated December 9, 1993, as a way of complying 
with the proposed AD. The FAA concurs that this service information is 
a way of complying with the proposed action, and has included a note in 
the final rule that so indicates this.
    Another commenter proposes a change to the proposed AD that would 
allow reprogramming the existing unit on board the aircraft as a method 
of compliance with the proposed action. The FAA concurs that certain 
existing TCAS II part numbers may be reprogrammed with the unit on 
board the aircraft. The proposed AD has been modified to include this 
method on the applicable TCAS II processor part numbers.
    One commenter states that reference to the SAAB 340B airplanes in 
the General Aviation Airplanes list should be deleted. This commenter 
also recommends that reference to the Aerospatiale ATR-42 and ATR-72 
airplanes be moved from the General Aviation Airplanes list to the Air 
Transport Airplanes list. The FAA concurs and has revised the proposed 
AD accordingly.
    One commenter, who supports the implementation of ``Change 6.04A 
Enhanced'', requests that the FAA issue a supplementary notice of 
proposed rulemaking (NPRM) to propose installing this revised software 
by June 30, 1995. This commenter states that significant differences 
exist between ``Change 6.04A'' and ``Change 6.04A Enhanced''. The FAA 
does not concur. Comments received in response to the proposed AD 
reflect unanimous support for implementing ``Change 6.04A Enhanced''. 
The FAA considers the logic change (which reduces non-crossing RA's) to 
be minor. The intent is to correct the unsafe condition by installing 
modified TCAS II computer units that incorporate updated logic. The FAA 
has determined that the requirement to implement Version 6.04A 
software, including the latest enhancement, will (1) correct the unsafe 
condition; (2) maintain the same intent originally proposed without 
altering the substance of the proposed rule; and (3) impose no 
additional burden on the public than was previously proposed.
    In addition, issuing a supplemental NPRM would necessitate (under 
the provisions of the Administrative Procedures Act) reissuing the 
notice, reopening the public comment period, considering any additional 
comments received, and eventually issuing a final rule. The time 
required for these procedures could take as long as four additional 
months. In light of this, and in consideration of the amount of time 
that has already elapsed since issuance of the original NPRM, the FAA 
concludes that soliciting further public comment is not necessary and 
that further delay of the final rule action is not appropriate.
    Several commenters request that the FAA revise the economic impact 
specified in the proposed AD to reflect costs associated with the 
development, testing prior to certification, and certification of the 
modified processor. These costs would be absorbed by suppliers, 
installers, and airline operators. The FAA does not concur that the 
economic impact statement include this information. The 5 workhours 
necessary to accomplish the proposed action was provided to the FAA by 
the TCAS II processor manufacturer based on the best data available to 
date. This number represents the time required to install the revised 
software and test for proper operation after installation. The cost 
analysis in AD rulemaking actions typically does not include costs 
associated with development, testing prior to certification, and 
certification of a modified processor. The proposed action remains 
unchanged as a result of these comments.
    After careful review of all available information including the 
comments noted above, the FAA has determined that air safety and the 
public interest require the adoption of the rule as proposed except for 
the change in compliance time, the logic reference change, the option 
of reprogramming certain units on board the aircraft, reference to 
Collins SB No. 16, TTR-920-34-16, dated December 9, 1993, and minor 
editorial corrections. The FAA has determined that these changes and 
corrections will not change the meaning of the AD nor add any 
additional burden upon the public than was already proposed.
    The FAA estimates that 1,995 TCAS II processors in the U.S. 
registry will be affected by this AD, that it will take approximately 5 
workhours per processor (1 workhour for installation and 4 workhours 
for operational testing) to accomplish the required action, and that 
the average labor rate is approximately $55 an hour. Based on these 
figures, the total cost impact of this AD on U.S. operators is 
estimated to be $548,625. These figures are based on the assumption 
that none of the operators of the airplanes equipped with the affected 
TCAS II processors have accomplished the actions specified in this AD.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A copy of the final evaluation prepared for this 
action is contained in the Rules Docket. A copy of it may be obtained 
by contacting the Rules Docket at the location provided under the 
caption ``ADDRESSES''.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends 14 CFR part 
39 of the Federal Aviation Regulations as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C. 
106(g); and 14 CFR 11.89.

39.13  [Amended]

    2. Section 39.13 is amended by adding the following new AD:

94-01-06  Rockwell International, Collins Air Transport Division: 
Amendment 39-8788; Docket No. 93-CE-47-AD.

    Applicability: Traffic Alert and Collision Avoidance System II 
processors that are installed on, but not limited to the following 
airplanes (all serial numbers), certificated in any category:

General Aviation Airplanes

Astra Model 1125 airplanes
BAC Model 1-11 airplanes
British Aerospace Model 125-800 airplanes
Beech Models C90A, B200, 300, 350, and 400A airplanes
Canadair Models CL-600, CL-600-2B16, CL-601, CL-601-1A, and CL-601-
3A airplanes
Learjet Models 31, 55, and 60 airplanes
Falcon Models 20, 50, 200, and 900 airplanes
Gulfstream Models G2 and G3 airplanes
British Aerospace Models HS-125-700 airplanes and
Sabreliner Model 60 airplanes

Air Transport Airplanes

Aerospatiale Models ATR-42 and ATR-72 airplanes
Airbus Industries Models A300B2, A-300B, and A-320 airplanes
British Aerospace Models ATP and 146 airplanes
Boeing Models 707, 727, 737, 747, 757, and 767 airplanes
British Aerospace/Aerospatiale Model Concorde SST airplanes
de Havilland DHC-7 and DHC-8 series airplanes
McDonnell Douglas Models DC-8, DC-9, and DC-10, MD-80, and MD-11 
airplanes
Ilyushin Model IL-86 airplanes
Lockheed Model L-1011 airplanes
SAAB Models SF340A and SF340B airplanes and
Shorts Models SD3-60-300 airplanes.

    Compliance: Prior to December 31, 1994, unless already 
accomplished.
    To prevent collisions or near misses caused by incompatibility 
between the traffic alert and collision avoidance system (TCAS) II 
processors and the current air traffic control system, accomplish 
the following:
    (a) Incorporate ``Change 6.04A Enhanced'' by accomplishing 
either (1) or (2) below, as applicable:
    (1) Remove any TCAS II processor with a part number (P/N) suffix 
listed in the ``Existing P/N Suffix'' column of the table below, and 
install a corresponding TCAS II processor with a P/N listed in the 
``New
P/N Suffix'' column of the table below: 

------------------------------------------------------------------------
                                                                 New P/N
                      Existing P/N suffix                         suffix
------------------------------------------------------------------------
-001, -002, -011,..............................................     -020
-012, or -612..................................................         
-102, -111, or -112............................................     -120
-014...........................................................     -320
------------------------------------------------------------------------

    Note 1: Collins SB No. 16, TTR-920-34-16, dated December 9, 
1993, specifies procedures for incorporating the referenced New P/N 
suffixes.

    (2) Change the part number of the TCAS II unit on board the 
aircraft by reprogramming the software with a data loader in order 
to obtain the New P/N Suffix as specified in the following table: 

------------------------------------------------------------------------
                                                                 New P/N
                      Existing P/N suffix                         suffix
------------------------------------------------------------------------
-012...........................................................     -020
-112...........................................................     -120
-014...........................................................     -320
------------------------------------------------------------------------

    Note 2: Units with P/N suffix of -001, -002, -011, -102, -11, 
and -612 cannot be reprogrammed on board the aircraft.
    Note 3: Operators are encouraged to update the Airplane Flight 
Manual (AFM) or AFM Supplement. Collins TTR-920 TCAS II Transmitter 
Receiver Service Information Letter 2-93, titled ``CAS Logic Change 
6.04A'' specifies the information needed for this update.

    (b) Special flight permits may be issued in accordance with FAR 
21.197 and 21.199 to operate the airplane to a location where the 
requirements of this AD can be accomplished.
    (c) An alternative method of compliance or adjustment of the 
compliance times that provides an equivalent level of safety may be 
approved by the Manager, Wichita Aircraft Certification Office, 1801 
Airport Road, Room 100, Mid-Continent Airport, Wichita, Kansas 
67209. The request shall be forwarded through an appropriate FAA 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Wichita Aircraft Certification Office (ACO).

    Note 4: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Wichita ACO.

    (d) Service information that is referenced in this AD may be 
obtained from Rockwell International/Collins Air Transport Division, 
400 Collins Road, NE; Cedar Rapids, Iowa 52498. This information may 
also be examined at the FAA, Central Region, Office of the Assistant 
Chief Counsel, room 1558, 601 E. 12th Street, Kansas City, Missouri 
64106.
    (e) This amendment (39-8788) becomes effective on February 4, 
1994.

    Issued in Kansas City, Missouri, on December 29, 1993.
Gerald W. Pierce,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 93-32114 Filed 12-30-93; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 93-32113 Airworthiness Directives: Allied Signal Aerospace Company, Air Transport Avionics (Formerly Bendix/King Air Transport Avionics Division) Traffic Alert and Collision Avoidance System II Processors
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 509-511]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 93-32113]

[[Page Unknown]]

[Federal Register: January 5, 1994]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 93-CE-46-AD; Amendment 39-8787; AD 94-01-05]

 

Airworthiness Directives: Allied Signal Aerospace Company, Air 
Transport Avionics (Formerly Bendix/King Air Transport Avionics 
Division) Traffic Alert and Collision Avoidance System II Processors

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD) that 
applies to certain Allied Signal Aerospace Company, Air Transport 
Avionics (Allied Signal) Traffic Alert and Collision Avoidance System 
(TCAS) II processors that are installed on aircraft. This action 
requires replacing the existing TCAS II processor with a new processor 
that incorporates updated computer logic. The development of candidate 
enhancements to TCAS II logic that improves its utility and increases 
its overall operational acceptance prompted the proposed action. The 
actions specified by this AD are intended to prevent collisions or near 
misses caused by incompatibility between the TCAS II processors and the 
current air traffic control system.

EFFECTIVE DATE: February 4, 1994.

ADDRESSES: Information that relates to this AD may be examined at the 
Federal Aviation Administration (FAA), Central Region, Office of the 
Assistant Chief Counsel, room 1558, 601 E. 12th Street, Kansas City, 
Missouri 64106.

FOR FURTHER INFORMATION CONTACT: Mr. A. E. Clark, Manager, Systems and 
Equipment Branch, FAA, Atlanta Aircraft Certification Office, 1669 
Phoenix Parkway, suite 210C, Atlanta, Georgia 30349; telephone (404) 
991-3020; facsimile (404) 991-3606.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations to include an AD that applies to certain Allied 
Signal TCAS II processors that are installed on aircraft was published 
in the Federal Register on September 9, 1993 (58 FR 47405). The action 
proposed to require (1) removing from service all processors that do 
not have computer logic ``Change 6.04A'' incorporated; and (2) 
mandatory incorporation of ``Change 6.04A'' into the TCAS II computer 
system.
    The affected TCAS II processors are not designed for a specific 
aircraft type. These Allied Signal TCAS II processors are installed on, 
but not limited to the following airplanes:
     Aerospatiale ATR-42;
     Airbus Industries A-340;
     Beech Model 65-A90 airplanes;
     Boeing 727-100, 727-200, 737-200, 737-300, 737-400, 737-
500, 747-100, 747-200, 747-300, 747-400, 747SP, 757-200, 767-200, and 
767-300 Series airplanes;
     de Havilland DHC-7 series and Model DHC-8-100 airplanes;
     Fokker Models F.28 Mark 1000 and Mark 4000 airplanes;
     General Dynamics Models Convair 340 and 440 airplanes;
     Gulfstream Models G-159 and G-IV airplanes;
     Lockheed L1011 series airplanes;
     McDonnell Douglas--DC-8-60, DC-9-31, DC-9-51, DC-10-10 DC-
10-30, DC-13-30F, MD-11, and MD-80 series airplanes; and
     Rockwell International NA-265-65 airplanes.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received from 33 different owners, operators, 
manufacturers, and organizations.
    All commenters express their concern of the FAA's compliance date 
of December 30, 1993, especially since Allied Signal's service bulletin 
will not be available until early 1994. The following summarizes the 
compliance times that the commenters recommended:
     18 recommended one year or less;
     5 recommended longer than one year; and
     10 recommended an extension without a proposed time.

The National Air Traffic Controllers Association and the Airline Pilots 
Association both recommend an ``aggressive implementation'' of ``Change 
6.04A''. The FAA has re-evaluated the December 30, 1993, compliance 
time and has determined that the compliance time should be changed to 
December 31, 1994. In addition, ``Change 6.04A'' has been upgraded to 
``Change 6.04A Enhanced'', which eliminates unnecessary non-crossing 
resolution advisories (RA's) included in ``Change 6.04A''. Allied 
Signal has assured the FAA that (1) the upgrade to ``Change 6.04A 
Enhanced'' is minor and will be incorporated in the logic change for 
the TCAS II processor upgrades; and (2) this compliance time correlates 
with their schedule for disseminating service information and kits 
necessary to accomplish the incorporation of ``Change 6.04A Enhanced''. 
The proposed AD has been changed to reflect the compliance time change 
and logic change described above.
    In addition, Allied Signal states that ``Change 6.04'', which is 
FAA-certified and is currently in service, accomplishes the major 
intent of ``Change 6.04A Enhanced'' and should be considered as an 
acceptable interim version to allow the eventual upgrade to ``Change 
6.04A Enhanced''. The FAA recognizes that ``Change 6.04'' incorporates 
several of the features of ``Change 6.04A Enhanced''. However, the FAA 
has determined that (1) ``Change 6.04'' does not provide an equivalent 
level of safety to that of ``Change 6.04A Enhanced''; and (2) ``Change 
6.04A Enhanced'' should be incorporated as a way to prevent collisions 
or near misses caused by incompatibility between the TCAS II processors 
and the current air traffic control system. Compliance time extension 
consideration will be given on a case-by-case basis to airlines or 
operators experiencing compliance difficulties that arise because of 
fleet size. The proposed AD remains unchanged as a result of this 
comment.
    Allied Signal also lists several additional aircraft that these 
TCAS II processor units are certified for installation. The FAA has 
incorporated these into the proposed AD.
    One commenter, who supports the implementation of ``Change 6.04A 
Enhanced'', requests that the FAA issue a supplementary notice of 
proposed rulemaking (NPRM) to propose installing this revised software 
by June 30, 1995. This commenter states that significant differences 
exist between ``Change 6.04A'' and ``Change 6.04A Enhanced''. The FAA 
does not concur. Comments received in response to the proposed AD 
reflect unanimous support for implementing ``Change 6.04A Enhanced''. 
The FAA considers the logic change (which reduces non-crossing RA's) to 
be minor. The intent is to correct the unsafe condition by installing 
modified TCAS II computer units that incorporate updated logic. The FAA 
has determined that the requirement to implement Version 6.04A 
software, including the latest enhancement, will (1) correct the unsafe 
condition; (2) maintain the same intent originally proposed without 
altering the substance of the proposed rule; and (3) impose no 
additional burden on the public than was previously proposed.
    In addition, issuing a supplemental NPRM would necessitate (under 
the provisions of the Administrative Procedures Act) reissuing the 
notice, reopening the public comment period, considering any additional 
comments received, and eventually issuing a final rule. The time 
required for these procedures could take as long as four additional 
months. In light of this, and in consideration of the amount of time 
that has already elapsed since issuance of the original NPRM, the FAA 
concludes that soliciting further public comment is not necessary and 
that further delay of the final rule action is not appropriate.
    Several commenters request that the FAA revise the economic impact 
specified in the proposed AD to reflect costs associated with the 
development, testing prior to certification, and certification of the 
modified processor. These costs would be absorbed by suppliers, 
installers, and airline operators. The FAA does not concur that the 
economic impact statement include this information. The 1 workhour 
necessary to accomplish the proposed action was provided to the FAA by 
the TCAS II processor manufacturer based on the best data available to 
date. This number represents the time required to install the revised 
software. The cost analysis in AD rulemaking actions typically does not 
include costs associated with development, testing prior to 
certification, and certification of a modified processor. The proposed 
action remains unchanged as a result of these comments.
    After careful review of all available information including the 
comments noted above, the FAA has determined that air safety and the 
public interest require the adoption of the rule as proposed except for 
the change in compliance time, the logic reference change, the 
incorporation of known aircraft that these TCAS II processor units are 
installed on, and minor editorial corrections. The FAA has determined 
that these changes and corrections will not change the meaning of the 
AD nor add any additional burden upon the public than was already 
proposed.
    The FAA estimates that 3,000 TCAS II processors in the U.S. 
registry will be affected by this AD, that it will take approximately 1 
workhour per processor to accomplish the required action, and that the 
average labor rate is approximately $55 an hour. Based on these 
figures, the total cost impact of this AD on U.S. operators is 
estimated to be $165,000. These figures are based on the assumption 
that none of the operators of the airplanes equipped with the affected 
TCAS II processors have accomplished the actions specified in this AD.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A copy of the final evaluation prepared for this 
action is contained in the Rules Docket. A copy of it may be obtained 
by contacting the Rules Docket at the location provided under the 
caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends 14 CFR part 
39 of the Federal Aviation Regulations as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C. 
106(g); and 14 CFR 11.89.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new AD:

93-01-05  Allied Signal Aerospace Company, Air Transport Avionics 
(formerly Bendix/King Air Transport Avionics Division): Amendment 
39-8787; Docket No. 93-CE-46-AD.

    Applicability: Traffic Alert and Collision Avoidance System II 
processors that are installed on, but not limited to the following 
airplanes (all serial numbers), certificated in any category:

Aerospatiale ATR-42;
Airbus Industries A-340;
Beech Model 65-A90 airplanes;
Boeing 727-100, 727-200, 737-200, 737-300, 737-400, 737-500, 747-
100, 747-200, 747-300, 747-400, 747SP, 757-200, 767-200, and 767-300 
Series airplanes;
de Havilland DHC-7 series and Model DHC-8-100 airplanes;
Fokker Models F.28 Mark 1000 and Mark 4000 airplanes;
General Dynamics Models Convair 340 and 440 airplanes;
Gulfstream Models G-159 and G-IV airplanes;
Lockheed L1011 series airplanes;
McDonnell Douglas--DC-8-60, DC-9-31, DC-9-51, DC-10-10 DC-10-30, DC-
13-30F, MD-11, and MD-80 series airplanes; and
Rockwell International NA-265-65 airplanes.

    Compliance: Prior to December 31, 1994, unless already 
accomplished.
    To prevent collisions or near misses caused by incompatibility 
between the traffic alert and collision avoidance system (TCAS) II 
processors and the current air traffic control system, accomplish 
the following:
    (a) Remove any TCAS II processor with a part number (P/N) suffix 
listed in the ``Existing P/N Suffix'' column of the table below, and 
install a corresponding TCAS II processor with a P/N listed in the 
``New P/N Suffix'' column of the table below: 

------------------------------------------------------------------------
                                                                 New P/N
                     Existing P/N suffix                         suffix 
------------------------------------------------------------------------
-0102 or -0107................................................     -0108
-0203 or -0207................................................     -0208
-0301, -0302, or -0307........................................     -0308
-0402, -0405, or -0407........................................     -0408
-0504 or -0507................................................     -0508
-0606 or -0607................................................     -0608
-8101.........................................................     -0108
------------------------------------------------------------------------

    (b) Special flight permits may be issued in accordance with FAR 
21.197 and 21.199 to operate the airplane to a location where the 
requirements of this AD can be accomplished.
    (c) An alternative method of compliance or adjustment of the 
compliance times that provides an equivalent level of safety may be 
approved by the Manager, Atlanta Aircraft Certification Office, 1669 
Phoenix Parkway, Suite 210C, Atlanta, Georgia 30349. The request 
shall be forwarded through an appropriate FAA Maintenance Inspector, 
who may add comments and then send it to the Manager, Atlanta 
Aircraft Certification Office (ACO).

    Note: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Atlanta ACO.

    (d) Information that relates to the proposed AD may be examined 
at the FAA, Central Region, Office of the Assistant Chief Counsel, 
Room 1558, 601 E. 12th Street, Kansas City, Missouri 64106.
    (e) This amendment (39-8787) becomes effective on February 4, 
1994.

    Issued in Kansas City, Missouri, on December 29, 1993.
Gerald W. Pierce,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 93-32113 Filed 12-30-93; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 93-32112 Misleading Containers; Nonfunctional Slack-Fill
[Federal Register Volume 59, Number 3 (Wednesday, January 5, 1994)]
[Rules and Regulations]
[Pages 536-537]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 93-32112]

[[Page Unknown]]

[Federal Register: January 5, 1994]

-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES
[Docket No. 93N-0439]

21 CFR Part 100

 

Misleading Containers; Nonfunctional Slack-Fill

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is revoking a 
regulation that implements section 403(d) of the Federal Food, Drug, 
and Cosmetic Act (the act) by defining the circumstances in which a 
food is misbranded, and that became final by operation of law on May 
10, 1993. In addition, the agency is replacing this revoked regulation 
with one that was included in a final rule that published in the 
Federal Register of December 6, 1993 (58 FR 64123).

EFFECTIVE DATE: January 5, 1994.

FOR FURTHER INFORMATION CONTACT: Michelle A. Smith, Center for Food 
Safety and Applied Nutrition (HFS-158), Food and Drug Administration, 
200 C St. SW., Washington, DC 20204, 202-205-5099.

SUPPLEMENTARY INFORMATION: The Nutrition Labeling and Education Act of 
1990 (the 1990 amendments) (Pub. L. 101-535) became law on November 8, 
1990. Section 6 of the 1990 amendments established a procedure under 
which FDA was given 30 months from the date of their enactment to 
promulgate final rules implementing that section. Pursuant to that 
procedure, FDA published a proposal on January 6, 1993 (58 FR 2957) 
(the misleading container proposal), to amend its regulations by 
implementing new Sec. 100.100 (21 CFR 100.100) to define the 
circumstances in which a food is misbranded under section 403(d) of the 
act (21 U.S.C. 343(d)).
    Section 6(b)(3)(D)(ii) of the 1990 amendments provides that, if the 
final rule to implement section 403(d) of the act is not promulgated 
within 30 months of the date of passage of the 1990 amendments 
(November 8, 1990), then the regulation proposed to implement that 
section is to be considered a final regulation. Further, section 6 
provides that States and their political subdivisions shall be 
preempted with respect to section 403(d) of the act at that time.
    The 30-month period established by the 1990 amendments expired on 
May 9, 1993. Because FDA was unable to publish a final rule, in the 
proceeding instituted in January 1993, by May 9, 1993, FDA published a 
document in the Federal Register of May 12, 1993 (58 FR 27932) (the May 
12, 1993, regulation), announcing that the regulation that FDA had 
proposed in the misleading container proposal was considered to be a 
final regulation by operation of law, effective May 10, 1993. This 
document did not conclude the rulemaking begun in January, 1993, 
however. Rather, the May 12, 1993, regulation was part of a separate 
proceeding that is compelled under section 6(b)(3)(D)(ii) of the 1990 
amendments (see H. Rept. 101-538, 101st Cong., 2d sess. 18 and 136 
Congressional Record 5842 on the effect of this ``hammer'' provision).
    In the Federal Register of December 6, 1993 (58 FR 64123), FDA 
published a final rule on the circumstances in which containers are 
misleading and thus would misbrand the food under section 403(d) of the 
act. This final rule concluded the proceeding that the agency 
instituted with the misleading container proposal. In the May 12, 1993, 
document, FDA stated that when it issued such a final rule, it would 
act to supersede the regulation that had become final by operation of 
law. Thus, the agency proposed to withdraw the May 10, 1993, regulation 
in the Federal Register of December 6, 1993 (58 FR 64208).
    FDA explained that it was proposing to do so for two reasons. 
First, the May 10, 1993, regulation did not have the benefit of public 
comment. Thus, the regulation included in the December 6, 1993, final 
rule (the December 6, 1993 regulation), which was the product of notice 
and comment rulemaking, is better able than the May 10, 1993, 
regulation to ensure adequate implementation of section 403(d) of the 
act and to facilitate compliance. Second, FDA tentatively found that 
because of the minor differences between the May 10, 1993, regulation 
and the December 6, 1993, regulation, replacing the former with the 
latter will not result in any hardship to manufacturers who have relied 
on the May 10, 1993, regulation.
    FDA gave interested persons 10 days to comment on its proposal to 
withdraw the May 10, 1993, regulation. It also proposed to make any 
final rule that issues in this proceeding effective on the date of its 
publication in order to ensure that the supersession of the May 10, 
1993, regulation proceeded as expeditiously as possible and with a 
minimum of confusion or ambiguity.
    The comment period on the proposal to withdraw the May 10, 1993, 
regulation closed on December 17, 1993. FDA received no comments on 
this proposed action. Therefore, FDA advises that the May 10, 1993, 
regulation, which became final by operation of law, is withdrawn. FDA 
advises that it is replacing that regulation with the December 6, 1993, 
regulation.

Environmental Impact

    In the December 6, 1993, proposal (58 FR 64208 at 64209), FDA 
stated that it had determined under 21 CFR 25.24(a)(ii) that this 
action is of a type that does not individually or cumulatively have a 
significant effect on the human environment, and that as a result, 
neither an environmental assessment nor an environmental impact 
statement is required. FDA received no comments on the conclusion; 
therefore FDA restates it here.

Economic Impact

    In the December 6, 1993, proposal (58 FR 64208 at 64209), FDA 
incorporated the conclusion from the December 6, 1993, final rule on 
slack-fill that the agency's action in replacing the May 10, 1993, 
regulation would not have any significant economic effects. The agency 
received no comments on this conclusion and consequently is restating 
it here.

List of Subject in 21 CFR Part 100

    Administrative practice and procedure, Food labeling, Foods.

    Therefore, under the Federal Food, Drug, and Cosmetic Act and under 
authority delegated to the Commissioner of Food and Drugs, 21 CFR part 
100 is amended as follows:

PART 100--GENERAL

    1. The authority citation for 21 CFR part 100 continues to read as 
follows:

    Authority: Secs. 201, 301, 307, 402, 403, 409, 701 of the 
Federal Food, Drug, and Cosmetic Act (21 U.S.C. 321, 331, 337, 342, 
343, 348, 371).

Sec. 100.100  [Removed]

    2. Subpart F consisting of Sec. 100.100 Misleading containers (as 
published in the Federal Register of May 12, 1993 (58 FR 27932), is 
removed.
    3. For the convenience of the reader, FDA is republishing without 
change new subpart F, consisting of Sec. 100.100 (as published in the 
Federal Register of December 6, 1993 (58 FR 64136) to read as follows:

Subpart F--Misbranding for Reasons Other Than Labeling

Sec. 100.100  Misleading containers.

    In accordance with section 403(d) of the act, a food shall be 
deemed to be misbranded if its container is so made, formed, or filled 
as to be misleading.
    (a) A container that does not allow the consumer to fully view its 
contents shall be considered to be filled as to be misleading if it 
contains nonfunctional slack-fill. Slack-fill is the difference between 
the actual capacity of a container and the volume of product contained 
therein. Nonfunctional slack-fill is the empty space in a package that 
is filled to less than its capacity for reasons other than:
    (1) Protection of the contents of the package;
    (2) The requirements of the machines used for enclosing the 
contents in such package;
    (3) Unavoidable product settling during shipping and handling;
    (4) The need for the package to perform a specific function (e.g., 
where packaging plays a role in the preparation or consumption of a 
food), where such function is inherent to the nature of the food and is 
clearly communicated to consumers;
    (5) The fact that the product consists of a food packaged in a 
reusable container where the container is part of the presentation of 
the food and has value which is both significant in proportion to the 
value of the product and independent of its function to hold the food, 
e.g., a gift product consisting of a food or foods combined with a 
container that is intended for further use after the food is consumed; 
or durable commemorative or promotional packages; or
    (6) Inability to increase level of fill or to further reduce the 
size of the package (e.g., where some minimum package size is necessary 
to accommodate required food labeling (excluding any vignettes or other 
nonmandatory designs or label information), discourage pilfering, 
facilitate handling, or accommodate tamper-resistant devices).
    (b) [Reserved]

    Dated: December 30, 1993.
 William K. Hubbard,
 Acting Deputy Commissioner for Policy.
[FR Doc. 93-32112 Filed 12-30-93; 2:40 pm]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.