Federal Register final rules — 1996-02-29

issue-1996-02-29Federal Register final rules — 1996-02-29Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-4706 National Emission Standards for Hazardous Air Pollutants for Source Categories: Gasoline Distribution (Stage I)
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7718-7724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4706]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 63

[AD-FRL-5432-3]

National Emission Standards for Hazardous Air Pollutants for 
Source Categories: Gasoline Distribution (Stage I)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule amendments.

-----------------------------------------------------------------------

SUMMARY: This action amends the ``National Emission Standards for 
Hazardous Air Pollutants for Source Categories: Gasoline Distribution 
(Stage I)'' (the ``Gasoline Distribution NESHAP''). These final 
amendments extend the initial compliance date for the equipment leak 
provisions applicable to existing sources to no later than December 15, 
1997, and amend the date by which an existing facility must provide an 
initial notification to December 16, 1996 or 1 year after a facility 
becomes subject to the Gasoline Distribution NESHAP, whichever is 
later.

DATES: Effective Date. February 29, 1996.
    Judicial Review. Under section 307(b)(1) of the Clean Air Act 
(Act), judicial review of NESHAP is available only by filing a petition 
for review in the U.S. Court of Appeals for the District of Columbia 
Circuit within 60 days of today's publication of these final 
amendments. Under section 307(b)(2) of the Act, the requirements that 
are the subject of this document may not be challenged later in civil 
or criminal proceedings brought by the EPA to enforce these 
requirements.

ADDRESSES: Docket. Docket No. A-92-38, Categories VI Reconsideration 
and VII Amendments, containing 

[[Page 7719]]
information considered by the EPA in developing the final amendments, 
is available for public inspection and copying between 8 a.m. and 5:30 
p.m., Monday through Friday, except Federal holidays, at the EPA's Air 
and Radiation Docket and Information Center, room M1500, U.S. 
Environmental Protection Agency, 401 M Street SW., Washington, DC 
20460; telephone (202) 260-7548. A reasonable fee may be charged for 
copying. This docket also contains information considered by the EPA in 
proposing and promulgating the Gasoline Distribution NESHAP.
    An electronic version of these final amendments and the proposal 
are available for download from the EPA Technology Transfer Network 
(TTN), a network of electronic bulletin boards developed and operated 
by the Office of Air Quality Planning and Standards. The TTN provides 
information and technology exchange in various areas of air pollution 
control. The service is free, except for the cost of a phone call. Dial 
(919) 541-5742 for data transfer of up to 14,400 bits per second. The 
TTN is also available on the Internet (access: TELNET 
ttnbbs.rtpnc.epa.gov). If more information on the operation of the TTN 
is needed, contact the systems operator at (919) 541-5384.

FOR FURTHER INFORMATION CONTACT: Mr. Stephen Shedd at telephone number 
(919) 541-5397 or at fax number (919) 541-3470, Emission Standards 
Division (MD-13), U.S. Environmental Protection Agency, Research 
Triangle Park, North Carolina 27711.

SUPPLEMENTARY INFORMATION: The information presented in this preamble 
is organized as follows:

I. Background and Final Amendments
    A. Background
    B. Summary of Amendments
II. Comments on the Proposed Amendments
    A. Public Participation
    B. Comments Received on the Proposed Amendments
    C. Summary of Comments and EPA Responses
    1. Opportunity for Comment
    2. Extension of Deadline for Initial Notification
    3. Extension of Initial Compliance Date for Leak Detection and 
Repair (LDAR)
    4. Potential to Emit (PTE)
    5. Risk
III. Administrative Requirements
    A. Paperwork Reduction Act
    B. Executive Order 12866
    C. Regulatory Flexibility Act
    D. Unfunded Mandates Act
    E. Regulatory Review

I. Background and Final Rule Amendments

A. Background

    On December 14, 1994 (59 FR 64303), the EPA promulgated the 
``National Emission Standards for Hazardous Air Pollutants for Source 
Categories: Gasoline Distribution (Stage I)'' (the ``Gasoline 
Distribution NESHAP''). The Gasoline Distribution NESHAP regulates all 
hazardous air pollutants (HAP) emitted from new and existing bulk 
gasoline terminals and pipeline breakout stations that are major 
sources of HAP emissions or are located at sites that are major sources 
of HAP emissions. Among the promulgated requirements for existing 
sources under this rule are the requirements that sources institute an 
equipment leak prevention program and provide an initial notification 
of regulatory status no later than December 14, 1995 (40 CFR 
Secs. 63.424(e) and 63.428(a)).
    On November 7, 1995 (60 FR 56133), the EPA proposed amendments to 
the Gasoline Distribution NESHAP. The EPA proposed to amend the initial 
compliance date for the equipment leak provisions applicable to 
existing sources from no later than December 14, 1995 to no later than 
December 15, 1997, and to amend the date by which an existing facility 
must provide an initial notification to December 16, 1996 or 1 year 
after a facility becomes subject to the Gasoline Distribution NESHAP, 
whichever is later. Those modifications were proposed because the 
compliance date for these provisions was approaching and the EPA 
believes that, under current circumstances, additional time will allow 
sources a better opportunity to establish major or area source status 
without forgoing quantifiable emissions reductions.
    On December 8, 1995 (60 FR 62991), the EPA issued a partial 3-month 
stay of the December 14, 1995 compliance date for equipment leak 
prevention provisions and providing an initial notification of 
regulatory status and use of a screening equation in the Gasoline 
Distribution NESHAP. The December 14, 1995 compliance date for leak 
detection and repair provisions and initial notifications was stayed 
for existing facilities until March 7, 1996. The EPA issued the stay 
pursuant to Clean Air Act section 307(d)(7)(B), 42 U.S.C. 
7607(d)(7)(B), which provides the Administrator authority to stay the 
effectiveness of a rule during reconsideration.

B. Summary of Amendments

    After considering all of the comments, both for and against the 
proposed amendments, the EPA is promulgating these rule amendments as 
they were proposed. The EPA consideration and response to all the 
comments are contained in the next section of this document. In 
summary, the final amendments consist of two new compliance dates in 
the promulgated rule: the initial compliance date for the equipment 
leak provisions (Sec. 63.424(e)) applicable to existing sources is no 
later than December 15, 1997, and the date by which an existing 
facility must provide an initial notification (Sec. 63.428(a)) is 
December 16, 1996 or 1 year after a facility becomes subject to the 
Gasoline Distribution NESHAP, whichever is later. This action also 
clarifies that all initial notifications are to be submitted by the 
same time (December 16, 1996) as intended at proposal and noted in the 
stay. The EPA is promulgating this related clarifying amendment that 
extends the notification for area source facilities using an emission 
screening equation (Sec. 63.428 (i)(1) and (j)(1)) to that same date. 
The EPA continues to believe that, under current circumstances, this 
additional time is needed to allow sources a better opportunity to 
establish major or area source status without forgoing quantifiable 
emissions reductions.

II. Comments on the Proposed Amendments

A. Public Participation

    These amendments were proposed in the Federal Register on November 
7, 1995 (60 FR 56133). Public comments were solicited at the time of 
proposal. Electronic versions of the preamble and proposed regulatory 
amendments were made available to interested parties immediately after 
signature (on November 2, 1995) via the TTN bulletin board (see 
ADDRESSES section of this preamble for more TTN information).
    The preamble to the proposed amendments provided the public the 
opportunity to request a public hearing. However, a public hearing was 
not requested. The public comment period for the proposed amendments 
was from November 7, 1995 until December 7, 1995 and the document was 
available to the public on the TTN even earlier, as of November 2, 
1995. In all, 13 comment letters were received. The comments have been 
carefully considered in arriving at the final amendments being 
promulgated in this document.

B. Comments Received on the Proposed Amendments

    Comments on the proposed amendments were received from 13 
commenters, consisting of oil 

[[Page 7720]]
companies (10), trade organizations (2), and one environmental 
organization. Most of the commenters were in general agreement with the 
proposed amendments. Due to the small number of comments received, and 
the fact that technical issues were not involved, no background 
information document (BID) was prepared to present more detailed 
comments and responses.
    However, the original comment letters have been placed in the 
docket, which is referred to in the ADDRESSES section of this preamble. 
For summary purposes, all of the comments have been grouped by the 
topic areas they address, and are discussed in the next section.

C. Summary of Comments and EPA Responses

    As mentioned in the previous section, all but one of the commenters 
expressed general agreement with the proposed amendments to the 
Gasoline Distribution (Stage I) NESHAP. A summary of the major comments 
and the EPA's responses is presented below.
(1) Opportunity for Comment
    One commenter considered the comment period for the proposal to be 
inadequate to allow most citizens to comment on the proposal, since it 
frequently requires a week or more for the Federal Register to arrive 
at public libraries, and another week or more for placement on library 
shelves. This leaves less than 2 weeks to research, write, edit, and 
mail comments. This commenter also felt that most citizens were 
unlikely to have learned of the opportunity to request a public hearing 
before the deadline for requesting such a hearing expired. However, the 
commenter did not request extension of the time to comment.
    The EPA placed the proposal preamble and amendments on the TTN on 
November 2, 1995, 1 day after it was signed by the Administrator. The 
TTN is an electronic (computer) bulletin board, free to users, and is 
available on the Internet for use by the public. The usual comment 
period (30 days beginning with publication of the proposal in the 
Federal Register) and opportunity for requesting a hearing were 
provided at the time of proposal. No person contacted the EPA to 
request more time to comment. The time period was consistent with the 
requirements of section 307 of the Act. The EPA did not provide a 
longer comment period due to the relative narrowness and simplicity of 
the proposal and the proximity of the compliance dates. For these 
reasons, the EPA believes that a reasonable amount of time was afforded 
the public for commenting on the proposal.
(2) Extension of Deadline for Initial Notification
    Twelve of the commenters expressed support for the proposed 
amendment to the initial notification date for existing sources. Most 
said that the change was essential to provide many bulk terminals and 
pipeline breakout stations a reasonable opportunity to calculate their 
potential to emit and to determine the applicability of the NESHAP. 
Four commenters supported the non-binding clause of the initial 
notification, feeling that such a clause will encourage would-be major 
sources to consider pollution prevention opportunities or additional 
controls prior to the December 15, 1997 compliance date. Commenters 
also pointed out that the amended notification date would not have any 
adverse impact on the environment. Potential negative consequences of 
not finalizing the amendment cited by commenters included the erroneous 
classification of many facilities as major sources due to the short 
time available to establish area source status, and the avoidance of 
these terminals by outside tank truck firms not wishing to incur the 
vapor tightness testing obligations associated with affected terminals.
    The EPA is promulgating the amendment to the initial notification 
deadline for existing sources as it was proposed: 1 year after an 
affected source becomes subject to the NESHAP or by December 16, 1996, 
whichever is later. In addition, the clause specifying that 
declarations of major source status submitted by this deadline will be 
considered non-binding for 1 year has been retained in the final 
amendments. This means that facilities that include in their 
notification a brief description and schedule for their planned actions 
for achieving area source status by December 15, 1997 can make a change 
to their status until this latter deadline. The EPA believes that 
although the information in the notifications may change, it provides 
necessary information for tank truck companies in planning their vapor 
tightness testing schedules and for Federal, State, and local air 
pollution control agencies in planning for rule implementation and 
compliance activities.
(3) Extension of Initial Compliance Date for Leak Detection and Repair 
(LDAR)
    Twelve of the commenters also supported the proposed amendment to 
the initial compliance date, which affects only periodic visual 
inspection programs for leaks from gasoline equipment components. These 
commenters said that the change was essential to provide many terminals 
and pipeline breakout stations a reasonable chance to demonstrate that 
they are not major sources subject to the NESHAP, and to allow time for 
the resolution of the potential to emit issue (see next comment topic). 
One commenter stated that this amendment would provide State and local 
agencies additional time to develop EPA-approved federally enforceable 
State operating permit (FESOP) programs and to complete permit 
processing. Another company said that EPA approvals of its 33 FESOP and 
15 Title V permit actions have been very slow and the company would not 
be able to obtain these permits by the promulgated first compliance 
date of December 14, 1995. The company felt that this date extension 
would give them a reasonable opportunity to obtain approval of 
artificial limits on potential to emit from most, if not all, of the 
appropriate State agencies. Commenters believed that having a common 
compliance date for all aspects of the regulation would allow more time 
for facility owners and operators to consider pollution prevention 
opportunities or additional controls. A number of commenters pointed 
out that equipment leak emissions represent a minor portion of a 
facility's total HAP emission inventory, and most facilities already 
have some type of routine visual inspection program. Therefore, the 
proposed change would have no long-term adverse impact on human health 
or the environment.
    One commenter, however, expressed concern that the EPA, by delaying 
the initial compliance date, would put citizens at risk on the basis of 
the already high levels of benzene and other gasoline components in the 
air around terminals.
    The EPA has considered all of these comments, including the comment 
opposing the compliance date extension. The EPA continues to believe 
that deferral of the compliance date for the equipment leak provisions 
for existing sources until December 15, 1997 is the most appropriate 
way to allow sources a better opportunity to establish major or area 
source status without forgoing quantifiable emissions reductions. The 
EPA also agrees with commenters that equipment leak emissions are 
relatively small under normal operations, and so delaying compliance 
with the visual inspection requirement for major source facilities will 
not produce any significant increase in risk to exposed populations. 
(See the more complete discussion of risk under section (5) Risk 
below.) 

[[Page 7721]]

(4) Potential to Emit (PTE)
    Several commenters took issue with the EPA's policy that only 
federally enforceable control standards or operating limitations would 
be considered in determining the potential to emit of facilities and, 
consequently, whether they would be a major source and subject to the 
NESHAP. Four commenters cited a decision by the U.S. Court of Appeals 
for the District of Columbia Circuit ruling that the EPA's stand on the 
issue is unlawful, which the commenters interpreted to indicate that 
the policy has been vacated and is no longer in effect. One commenter 
stated that the EPA's insistence on maintaining its policy on this 
matter creates confusion on the part of facilities potentially subject 
to this rule. Three other commenters said that requiring federally 
enforceable emission controls in determinations of potential to emit 
inflates emission estimates, which could cause area sources to be 
classified as major sources required to undertake unnecessary controls 
and programs. Two commenters concluded that the EPA should allow 
permitting authorities to take into account State and local controls 
that the permitting authority deems effective in limiting facilities' 
potential to emit.
    The EPA's proposal to amend the Gasoline Distribution NESHAP 
focused narrowly on the issue of modifying compliance dates for two 
provisions, the equipment leak inspection requirements and the 
notification of major source status, rather than the distinct issues of 
whether the emission screening equation and the emissions inventory 
methods of calculating potential to emit should be revised to reflect 
limitations on emissions that are not federally enforceable, and 
whether Federal enforceability should be a necessary criterion for 
determination of potential to emit under section 112 in general. Thus, 
comments regarding these latter two issues are outside the scope of the 
topics raised by the proposal. However, the EPA believes it is useful 
in response to these comments to summarize the impact of the court 
decision referenced by commenters, as well as related EPA guidance 
recognizing State-enforced PTE limits under section 112 during a 
transition period.
    The EPA interpreted the impact of the referenced court decision in 
a January 22, 1996 guidance memorandum, which is contained in the 
docket and is also available on the TTN (see ADDRESSES section). The 
memorandum stated that, in National Mining Association v. EPA, 59 F.3d 
1351 (D.C. Cir. 1995), the court addressed regulations under subpart A 
of 40 CFR part 63, the ``General Provisions'' of hazardous air 
pollutant programs under section 112. The court found that the EPA had 
not adequately explained why only federally enforceable measures should 
be considered as limits on a source's potential to emit. Accordingly, 
the court remanded the section 112 General Provisions regulation to the 
EPA for further proceedings. The EPA must either provide a better 
explanation as to why Federal enforceability promotes the effectiveness 
of State controls, or remove the exclusive Federal enforceability 
requirement. The court did not vacate the section 112 regulations; that 
is, the court did not declare the regulations null and void. The 
regulations remain in effect pending completion of new rulemaking.
    The EPA plans to hold discussions with stakeholders and propose 
rulemaking amendments by spring 1996, and to issue final rules by 
spring 1997, that would address the court decisions impacting 
regulations promulgated pursuant to section 112 as well as other air 
act provisions. The EPA currently plans to address the following 
options, after discussions with stakeholders:
    (a) An approach that would recognize ``effective'' State-
enforceable limits as an alternative to federally enforceable limits on 
a source's potential to emit. Under this option, a source whose maximum 
capacity to emit without pollution controls or operational limitations 
exceeds relevant major source thresholds may take a State or local 
limit on its potential to emit. In such circumstances, the source must 
be able to demonstrate that the State-enforceable limits are (1) 
enforceable as a practical matter, and (2) being regularly complied 
with by the facility.
    (b) An approach under which the EPA would continue to require 
Federal enforceability of limits on a source's potential to emit. Under 
this approach, in response to specific issues raised by the court in 
National Mining, the EPA would present further explanation regarding 
why the Federal enforceability requirement promotes effective controls. 
Under this approach, the EPA would propose simplifying changes to the 
administrative provisions of the current Federal enforceability 
regulations.
    Any method for limiting potential to emit made available as a 
result of the EPA's response to the NMA remand will be available to 
sources in the Gasoline Distribution (Stage I) source category. The EPA 
expects to respond to the remand in NMA with adequate time to allow 
such sources to seek any new methods developed.
    The EPA today reiterates that independent from the decision in 
National Mining, current EPA policy already recognizes State-
enforceable PTE limits under section 112 in many circumstances under a 
transition policy intended to provide for orderly implementation of 
these new programs under the Clean Air Act Amendments of 1990. This 
policy is set forth in a memorandum, ``Options for Limiting the 
Potential to Emit (PTE) of a Stationary Source Under Section 112 and 
Title V of the Clean Air Act'' (January 25, 1995), and has been amended 
in one significant way by the January 22, 1996 guidance memorandum as 
noted below. (Both memoranda are contained in the docket and are also 
available on the TTN, see ADDRESSES section.)
    Under the terms of the EPA's transition policy, the transition 
period is to end in January 1997. In addition, completion of the EPA's 
rulemaking in response to the recent court decisions, which the EPA 
anticipates will occur by early 1997, may render the transition policy 
unnecessary after that time. However, in conjunction with the 
rulemaking, the EPA will consider whether it is appropriate to extend 
the transition period beyond January 1997.
    In recognition of the absence in some States of suitable federally 
enforceable mechanisms to limit PTE applicable to sources that might 
otherwise be subject to section 112 or Title V, the EPA's policy 
provides for the consideration of State-enforceable limits as a gap-
filling measure during a transition period that extends until January 
1997. Under this policy, for the 2-year transition period, restrictions 
contained in State permits issued to sources that actually emit more 
than 50 percent, but less than 100 percent, of a relevant major source 
threshold are treated by the EPA as acceptable limits on potential to 
emit, provided: (a) the permit and the restriction in particular are 
enforceable as a practical matter, and (b) the source owner submits a 
written certification to the EPA accepting EPA and citizen enforcement. 
In light of National Mining, the EPA believes that the certification 
requirement is no longer appropriate as part of this policy. 
Accordingly, under the January 1996 guidance, the EPA amended the 
January 1995 transition policy by deleting the certification 
requirement.
    In addition, under the transition policy, sources with consistently 
low levels of actual emissions relative to major source thresholds can 
avoid major source requirements even absent any permit or other 
enforceable limit on PTE. Specifically, the policy provides 

[[Page 7722]]
that sources which maintain their emissions at levels that do not 
exceed 50 percent of any applicable major source threshold are not 
treated as major sources and do not need a permit to limit PTE, so long 
as they maintain adequate records to demonstrate that the 50 percent 
level is not exceeded.
    The EPA's action in this rule to extend the compliance dates for 
the two provisions will give more opportunities for sources to obtain 
potential to emit limits consistent with the EPA's guidance and hence 
avoid being subject to regulation as major sources.
    One commenter disagreed with the EPA's interpretation that if a 
facility does not demonstrate area source status by the first 
substantive compliance date, then the facility, regardless of actual 
emissions or any subsequent State operating permit limitation, would be 
permanently classified as a major source.
    The EPA's interpretation was explained in an EPA guidance 
memorandum from John S. Seitz, ``Potential to Emit for MACT Standards--
Guidance on Timing Issues'' (May 16, 1995), which is contained in the 
docket (item no. VI-B-6) and is also available on the TTN (see 
ADDRESSES section). The EPA notes that the commenter viewed finalizing 
the proposed amendments to the compliance dates as a ``critical need * 
* * [to] avoid unintended inclusion of area sources.'' For the 
facilities in this source category, the EPA and many commenters believe 
that delaying the first compliance date will provide the relief being 
sought by the above commenters.
    A number of commenters noted that the emission screening equation 
in the final rule cannot be used by bulk terminals because essentially 
all terminals handle non-gasoline products, such as diesel fuel or home 
heating oil, which makes them ineligible to use the equation. The 
commenters urged the EPA to reexamine the issue of which facilities are 
eligible to use the equation, pointing out that the HAP emitted from 
these products are ``de minimis'' and should not compel facilities to 
use the more cumbersome and costly emissions inventory mechanism for 
determining potential to emit.
    As discussed in the proposal preamble, the EPA is considering data 
and information submitted by the API (and available in the docket) in 
order to evaluate a possible expansion of the screening equation to 
include non-gasoline products that emit HAP, and will make a final 
decision about changes to the equation under a separate action. The EPA 
is still reviewing this information and is not prepared to discuss any 
specific changes to the equation at this time. Depending on the results 
of its review of the pertinent data, the EPA may propose changes to the 
equation and request comment in a forthcoming and separate action in 
the Federal Register.
(5) Risk
    One commenter opposed the proposal to delay the initial compliance 
date for the NESHAP on the grounds that the health risk to populations 
exposed to ambient HAP concentrations near terminals would be 
increased. The commenter expressed a belief that the language and 
legislative history of the Clean Air Act reflects a Congressional 
intent to limit public exposures to carcinogens to a level that will 
not produce a lifetime risk of cancer at a rate greater than one in a 
million. According to the commenter, a 50-year lifetime constant 
exposure to a gasoline vapor concentration of 0.639 part per billion 
(ppb) would correspond to the Act's one-in-a-million lifetime risk 
standard. The commenter cited a 1993 air quality study at the Paw Creek 
terminals in North Carolina that indicated a maximum benzene 
concentration of 2.2 ppb, which they claimed corresponds to a lifetime 
cancer risk of at least 131 per million. The commenter concluded that 
emission levels corresponding to such risks ought to be reduced as 
quickly as possible.
    The EPA has not performed a risk analysis to allow the EPA to 
verify the risk estimation results cited by the commenter, nor did the 
commenter include a copy of the study with their comments. However, in 
accordance with sections 112 (d)(6) and (f)(2) of the Act, the Gasoline 
Distribution NESHAP will be reviewed within 8 years after the date of 
promulgation (i.e., by December 14, 2002). This review may include an 
assessment of residual health risk, in addition to many other aspects 
of the regulation. As discussed above, the proposal and this final 
action only extend the compliance time for instituting programs to 
perform visual inspections and subsequent repair of equipment 
components in gasoline service at terminals and pipeline breakout 
stations. Most facilities are already carrying out similar informal 
programs and, furthermore, data show that the HAP emissions from this 
equipment in normal operation are very low. The compliance date of 
December 15, 1997 promulgated in the final rule for the remaining 
emission sources at bulk terminals will not be affected by this action. 
Due to these factors, the EPA believes that this action will not 
substantially change the emissions near major source gasoline 
distribution facilities. For these reasons, the EPA is finalizing the 
extension of the compliance date for LDAR until December 15, 1997 as 
proposed on November 7, 1995.

III. Administrative Requirements

A. Paperwork Reduction Act

    The information collection requirements of the previously 
promulgated NESHAP were submitted to and approved by the Office of 
Management and Budget (OMB). A copy of this Information Collection 
Request (ICR) document (OMB control number 2060-0325) may be obtained 
from Ms. Sandy Farmer, Information Policy Branch, Environmental 
Protection Agency, 401 M Street., S.W. (mail code 2136), Washington, DC 
20460, or by calling (202) 260-2740.
    Today's amendments to the Gasoline Distribution NESHAP have no 
impact on the information collection burden estimates made previously. 
No additional certifications or filings were promulgated. Therefore, 
the ICR has not been revised.

B. Executive Order 12866

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the EPA 
must determine whether a regulation is ``significant'' and therefore 
subject to OMB review and the requirements of the Executive Order. The 
criteria set forth in section 1 of the Order for determining whether a 
regulation is a significant rule are as follows:
    (1) Is likely to have an annual effect on the economy of $100 
million or more, or adversely and materially affect a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety, or State, local, or tribal government communities;
    (2) Is likely to create a serious inconsistency or otherwise 
interfere with an action taken or planned by another agency;
    (3) Is likely to materially alter the budgetary impact of 
entitlements, grants, user fees, or loan programs or the rights and 
obligations of recipients thereof; or
    (4) Is likely to raise novel or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    The Gasoline Distribution NESHAP promulgated on December 14, 1994, 
was treated as a ``significant regulatory action'' within the meaning 
of the Executive Order. An estimate of the cost and benefits of the 
NESHAP was prepared at proposal as part of the 

[[Page 7723]]
background information document (BID) and was updated in the BID for 
the final rule to reflect comments and changes to the final rule. The 
amendments issued today have no impact on the estimates in the BID. The 
EPA's earlier estimates of costs and emission reductions were based on 
the Gasoline Distribution NESHAP affecting only major sources and did 
not quantify the emission reductions associated with the visual 
equipment leak detection program; in any event, these emission 
reductions are small relative to the total reduction for the source 
category.
    Pursuant to the terms of Executive Order 12866, it has been 
determined that this action is a ``non-significant regulatory action'' 
within the meaning of the Executive Order. As such, this action was not 
submitted to OMB for review.

C. Regulatory Flexibility Act

    The Regulatory Flexibility Act (5 U.S.C. 601 et seq.) requires the 
EPA to consider potential impacts of regulations on small business 
entities. The Act specifically requires the preparation of a Regulatory 
Flexibility Analysis in those instances where small business impacts 
are possible. When the EPA promulgated the Gasoline Distribution 
NESHAP, it analyzed the potential impacts on small businesses, 
discussed the results of this analysis in the Federal Register, and 
concluded that the promulgated regulation would not result in financial 
impacts that significantly or differentially stress affected small 
companies. Since today's action imposes no additional impacts, a 
Regulatory Flexibility Analysis has not been prepared.
    Pursuant to the provisions of 5 U.S.C. 605(b), I hereby certify 
that this rule will not have a significant economic impact on a 
substantial number of small business entities.

D. Unfunded Mandates Act

    Under section 202 of the Unfunded Mandates Reform Act of 1995 
(Unfunded Mandates Act), signed into law on March 22, 1995, the EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate, or to 
the private sector, of $100 million or more. Under section 205, the EPA 
must select the most cost effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires the EPA to establish a 
plan for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    The EPA has determined that today's action does not include a 
Federal mandate that may result in estimated costs of $100 million or 
more to either State, local, or tribal governments in the aggregate, or 
to the private sector. Therefore, the requirements of the Unfunded 
Mandates Act do not apply to this action.

E. Regulatory Review

    In accordance with sections 112(d)(6) and 112(f)(2) of the Act, 
this regulation will be reviewed 8 years from the date of promulgation. 
This review may include an assessment of such factors as evaluation of 
the residual health risk, any overlap with other programs, the 
existence of alternative methods of control, enforceability, 
improvements in emission control technology and health data, and the 
recordkeeping and reporting requirements.

List of Subjects in 40 CFR Part 63

    Environmental protection, Air pollution control, Hazardous 
substances, Petroleum bulk stations and terminals, Reporting and 
recordkeeping requirements.

    1Dated: February 23, 1996.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, part 63 of chapter I of 
title 40 of the Code of Federal Regulations is amended as follows:

PART 63--NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS 
FOR SOURCE CATEGORIES

    1. The authority citation for part 63 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

    2. Section 63.424 is amended by revising paragraph (e) to read as 
follows:

Sec. 63.424  Standards: Equipment leaks.

* * * * *
    (e) Initial compliance with the requirements in paragraphs (a) 
through (d) of this section shall be achieved by existing sources as 
expeditiously as practicable, but no later than December 15, 1997. For 
new sources, initial compliance shall be achieved upon startup.
* * * * *
    3. Section 63.428 is amended by revising paragraph (a), the first 
sentence of paragraph (f)(1), paragraph (i)(1), and paragraph (j)(1) to 
read as follows:

Sec. 63.428  Reporting and recordkeeping.

    (a) The initial notifications required for existing affected 
sources under Sec. 63.9(b)(2) shall be submitted by 1 year after an 
affected source becomes subject to the provisions of this subpart or by 
December 16, 1996, whichever is later. Affected sources that are major 
sources on December 16, 1996 and plan to be area sources by December 
15, 1997 shall include in this notification a brief, non-binding 
description of and schedule for the action(s) that are planned to 
achieve area source status.
* * * * *
    (f) * * *
    (1) In the case of an existing source or a new source that has an 
initial startup date before the effective date, the report shall be 
submitted with the notification of compliance status required under 
Sec. 63.9(h), unless an extension of compliance is granted under 
Sec. 63.6(i). * * *
* * * * *
    (i) * * *
    (1) Document and report to the Administrator not later than 
December 16, 1996 for existing facilities, within 30 days for existing 
facilities subject to Sec. 63.420(c) after December 16, 1996, or at 
startup for new facilities the methods, procedures, and assumptions 
supporting the calculations for determining criteria in Sec. 63.420(c);
* * * * *
    (j) * * *
    (1) Document and report to the Administrator not later than 
December 16, 1996 for existing facilities, within 30 days for existing 
facilities subject to Sec. 63.420(d) after December 16, 1996, or at 
startup for new facilities the use of the emission screening equations 
in Sec. 63.420(a)(1) or (b)(1) and the calculated value of ET or 
EP;
* * * * *
    4. Table 1 to subpart R is amended by revising the entry 
``63.9(b)(2)'' to read as follows:
* * * * * 

[[Page 7724]]

                      Table 1 to Subpart R.--General Provisions Applicability to Subpart R                      
----------------------------------------------------------------------------------------------------------------
           Reference                   Applies to subpart R                           Comment                   
----------------------------------------------------------------------------------------------------------------
                                                                                                                
*                  *                  *                  *                  *                  *                
63.9(b)(2).....................  No.............................  Subpart R allows additional time for existing 
                                                                   sources to submit initial notification. Sec. 
                                                                   63.428(a) specifies submittal by 1 year after
                                                                   being subject to the rule or December 16,    
                                                                   1996, whichever is later.                    
                                                                                                                
*                  *                  *                  *                  *                  *                
                                                        *                                                       
----------------------------------------------------------------------------------------------------------------

[FR Doc. 96-4706 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-4704 Melons Grown in South Texas; Increased Expenses and Establishment of Assessment Rate
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7688-7690]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4704]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Agricultural Marketing Service

7 CFR Part 979

[Docket No. FV95-979-1FIR]

Melons Grown in South Texas; Increased Expenses and Establishment 
of Assessment Rate

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (Department) is adopting as a 
final rule, without change, the provisions of an amended interim final 
rule that increased the level of authorized expenses and established an 
assessment rate to generate funds to pay those expenses under Marketing 
Order No. 979 for the 1995-96 fiscal period. Authorization of this 
budget enables the South Texas Melon Committee (Committee) to incur 
expenses that are reasonable and necessary to administer the program. 
Funds to administer this program are derived from assessments on 
handlers.

EFFECTIVE DATE: October 1, 1995, through September 30, 1996.

FOR FURTHER INFORMATION CONTACT: Martha Sue Clark, Marketing Order 
Administration Branch, Fruit and Vegetable Division, AMS, USDA, P.O. 
Box 96456, room 2523-S, Washington, DC 20090-6456, telephone 202-720-
9918, or Belinda G. Garza, McAllen Marketing Field Office, Fruit and 
Vegetable Division, AMS, USDA, 1313 East Hackberry, McAllen, TX 78501, 
telephone 210-682-2833.

SUPPLEMENTARY INFORMATION: This rule is issued under Marketing 
Agreement No. 156 and Order No. 979 (7 CFR part 979), regulating the 
handling of melons grown in South Texas, hereinafter referred to as the 
``order.'' The order is effective under the Agricultural Marketing 
Agreement Act of 1937, as amended (7 U.S.C. 601-674), hereinafter 
referred to as the ``Act.''
    The Department is issuing this rule in conformance with Executive 
Order 12866.
    This rule has been reviewed under Executive Order 12778, Civil 
Justice Reform. Under the marketing order provisions now in effect, 
South Texas melons are subject to assessments. It is intended that the 
assessment rate as issued herein will be applicable to all assessable 
melons handled during the 1995-96 fiscal period, which began October 1, 
1995, and ends September 30, 1996. This rule will not preempt any State 
or local laws, regulations, or policies, unless they present an 
irreconcilable conflict with this rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and requesting a modification of the order or to be exempted 
therefrom. A handler is afforded the opportunity for a hearing on the 
petition. After the hearing the Secretary would rule on the 

[[Page 7689]]
petition. The Act provides that the district court of the United States 
in any district in which the handler is an inhabitant, or has his or 
her principal place of business, has jurisdiction in equity to review 
the Secretary's ruling on the petition, provided a bill in equity is 
filed not later than 20 days after the date of the entry of the ruling.
    Pursuant to the requirements set forth in the Regulatory 
Flexibility Act (RFA), the Administrator of the Agricultural Marketing 
Service (AMS) has considered the economic impact of this rule on small 
entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and the rules issued thereunder, are unique in 
that they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are approximately 30 producers of South Texas melons under 
this marketing order, and approximately 27 handlers. Since the amended 
interim final was issued, information regarding a decrease in the 
number of producers from approximately 40 to 30 and an increase in the 
number of handlers from approximately 19 to 27 was received. Small 
agricultural producers have been defined by the Small Business 
Administration (13 CFR 121.601) as those having annual receipts of less 
than $500,000, and small agricultural service firms are defined as 
those whose annual receipts are less than $5,000,000. The majority of 
South Texas melon producers and handlers may be classified as small 
entities.
    The budget of expenses for the 1995-96 fiscal period was prepared 
by the South Texas Melon Committee, the agency responsible for local 
administration of the marketing order, and submitted to the Department 
for approval. The members of the Committee are producers and handlers 
of South Texas melons. They are familiar with the Committee's needs and 
with the costs of goods and services in their local area and are thus 
in a position to formulate an appropriate budget. The budget was 
formulated and discussed in a public meeting. Thus, all directly 
affected persons have had an opportunity to participate and provide 
input.
    The assessment rate recommended by the Committee was derived by 
dividing anticipated expenses by expected shipments of South Texas 
melons. Because that rate will be applied to actual shipments, it must 
be established at a rate that will provide sufficient income to pay the 
Committee's expenses.
    Committee administrative expenses of $234,044 for personnel, 
office, and compliance expenses were recommended in a mail vote. The 
assessment rate and funding for research and promotion projects were to 
be recommended at a later Committee meeting. The Committee 
administrative expenses of $234,044 were published in the Federal 
Register as an interim final rule October 23, 1995 (60 FR 54294). That 
interim final rule added Sec. 979.218, authorizing expenses for the 
Committee, and provided that interested persons could file comments 
through November 22, 1995. No comments were filed.
    The Committee subsequently met on December 12, 1995, and 
unanimously recommended an increase of $1,000 for administrative 
expenses, plus $160,115 in research expenses, for a total budget of 
$395,159. Budget items for 1995-96 which have increased compared to 
those budgeted for 1994-95 (in parentheses) are: Manager's salary, 
$19,094 ($15,172), office salaries, $24,000 ($22,000), payroll taxes, 
$4,000 ($3,100), insurance, $8,000 ($6,250), rent and utilities, $6,500 
($6,000), supplies, $2,000 ($1,500), postage, $1,500 ($1,000), 
telephone and telegraph, $4,000 ($2,500), furniture and fixtures, 
$2,000 ($1,000), equipment rental and maintenance, $3,500 ($2,500), 
contingencies, $6,000 ($5,278), Committee expenses, $2,000 ($700), 
manager's travel, $5,000 ($3,000), variety evaluation, $10,875 
($9,186), and $3,750 for deferred compensation (manager's retirement), 
which was not a line item expense last year. Items which have decreased 
compared to the amount budgeted for 1994-95 (in parentheses) are: field 
travel, $4,000 ($5,000), and field salary, $5,500 ($8,000). All other 
items are budgeted at last year's amounts, including $86,716 for a 
disease management program, $18,700 for an insect management program, 
$32,674 for breeding and variety development, and $11,150 for control 
of melon diseases.
    The initial 1995-96 budget, published on October 23, 1995, did not 
establish an assessment rate. Therefore, the Committee also unanimously 
recommended an assessment rate of $0.07 per carton, the same as last 
year. This rate, when applied to anticipated shipments of approximately 
4,500,000 cartons, will yield $315,000 in assessment income, which, 
along with $80,159 from the reserve, will be adequate to cover budgeted 
expenses. Funds in the reserve as of December 31, 1995, were $398,821, 
which is within the maximum permitted by the order of two fiscal 
periods' expenses.
    An amended interim final rule was published in the Federal Register 
on January 4, 1996 (61 FR 248). That interim final rule amended 
Sec. 979.218 to increase the level of authorized expenses and establish 
an assessment rate for the Committee. That rule provided that 
interested persons could file comments through February 5, 1996. No 
comments were received.
    While this action will impose some additional costs on handlers, 
the costs are in the form of uniform assessments on handlers. Some of 
the additional costs may be passed on to producers. However, these 
costs will be offset by the benefits derived from the operation of the 
marketing order. Therefore, the Administrator of the AMS has determined 
that this action will not have a significant economic impact on a 
substantial number of small entities.
    After consideration of all relevant matter presented, including the 
information and recommendations submitted by the Committee and other 
available information, it is hereby found that this rule, as 
hereinafter set forth, will tend to effectuate the declared policy of 
the Act.
    It is further found that good cause exists for not postponing the 
effective date of this rule until 30 days after publication in the 
Federal Register (5 U.S.C. 553) because the Committee needs to have 
sufficient funds to pay its expenses which are incurred on a continuous 
basis. The 1995-96 fiscal period began on October 1, 1995. The 
marketing order requires that the rate of assessment for the fiscal 
period apply to all assessable melons handled during the fiscal period. 
In addition, handlers are aware of this rule which was recommended by 
the Committee at a public meeting and published in the Federal Register 
as an amended interim final rule.

List of Subjects in 7 CFR Part 979

    Marketing agreements, Melons, Reporting and recordkeeping 
requirements.

    For the reasons set forth in the preamble, 7 CFR part 979 is 
amended as follows:

PART 979--MELONS GROWN IN SOUTH TEXAS

    Accordingly, the amended interim final rule revising Sec. 979.218 
which was published at 61 FR 248 on January 4, 1996, is adopted as a 
final rule without change.

[[Page 7690]]

    Dated: February 23, 1996.
Martha B. Ransom,
Acting Deputy Director, Fruit and Vegetable Division.
[FR Doc. 96-4704 Filed 2-28-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-4689 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7699-7700]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4689]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28480; Amdt. No. 1714]

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of the 
adoption of new or revised criteria, or because of changes occurring in 
the National Airspace System, such as the commissioning of new 
navigational facilities, addition of new obstacles, or changes in air 
traffic requirements. These changes are designed to provide safe and 
efficient use of the navigable airspace and to promote safe flight 
operations under instrument flight rules at the affected airports.

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference-approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matters incorporated by reference in the 
amendment is as follows:

For Examination

    1. FAA Rules Docket, FAA Headquarters Building, 800 Independence 
Avenue, SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which the affected 
airport is located; or
    3. The Flight Inspection Area Office which originated the SIAP.

For Purchase

    Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or
    2. The FAA Regional Office of the region in which the affected 
airport is located.

By Subscription

    Copies of all SIAPs, mailed once every 2 weeks, are for sale by the 
Superintendent of Documents, U.S. Government Printing Office, 
Washington, DC 20402.

FOR FURTHER INFORMATION CONTACT: Paul J. Best, Flight Procedures 
Standards Branch (AFS-420), Technical Programs Division, Flight 
Standards Service, Federal Aviation Administration, 800 Independence 
Avenue, SW., Washington, DC 20591; telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description of each SIAP is contained in official FAA form 
documents which are incorporated by reference in this amendment under 5 
U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the Federal Aviation 
Regulations (FAR). The applicable FAA Forms are identified as FAA Form 
8260-5. Materials incorporated by reference are available for 
examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction on charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.
    This amendment to part 97 is effective upon publication of each 
separate SIAP as contained in the transmittal. The SIAPs contained in 
this amendment are based on the criteria contained in the United States 
Standard for Terminal Instrument Approach Procedures (TERPS). In 
developing these SIAPs, the TERPS criteria were applied to the 
conditions existing or anticipated at the affected airports.
    The FAA has determined through testing that current non-localizer 
type, non-precision instrument approaches developed using the TERPS 
criteria can be flown by aircraft equipped with 

[[Page 7700]]
Global Positioning System (GPS) equipment. In consideration of the 
above, the applicable Standard Instrument Approach Procedure (SIAPs) 
will be altered to include ``or GPS'' in the title without otherwise 
reviewing or modifying the procedure. (Once a stand alone GPS procedure 
is developed, the procedure title will be altered to remove ``or GPS'' 
from these non-localizer, non-precision instrument approach procedure 
titles.) Because of the close and immediate relationship between these 
SIAPs and safety in air commerce, I find that notice and public 
procedure before adopting these SIAPs are, impracticable and contrary 
to the public interest and, where applicable, that good cause exists 
for making some SIAPs effective in less than 30 days.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air traffic control, Airports, Navigation (air).

    Issued in Washington, DC, on February 23, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

    Authority: 49 U.S.C. 40103, 40113, 40120, 44701; 49 U.S.C. 
106(g); and 14 CFR 11.49(b)(2).

    2. Part 97 is amended to read as follows:

Secs. 97.23, 97.27, 97.33, 97.35  [Amended]

    By amending: Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME or 
TACAN; Sec. 97.27 NDB, NDB/DME; Sec. 97.33 RNAV SIAPs; and Sec. 97.35 
COPTER SIAPs, identified as follows:

* * * Effective APR 25, 1996

Stuttgart, AR, Stuttgart Muni, NDB or GPS RWY 18, Amdt 9 Cancelled
Stuttgart, AR, Stuttgart Muni, NDB RWY 18, Amdt 9
Boone, IA, Boone Muni, NDB or GPS RWY 14, Amdt 9 Cancelled
Boone, IA, Boone Muni, NDB RWY 14, Amdt 9
Clinton, IA, Clinton Muni, VOR/DME or GPS RWY 21, Amdt 8 Cancelled
Clinton, IA, Clinton Muni, VOR/DME RWY 21, Amdt 8
Clinton, IA, Clinton Muni, NDB or GPS RWY 14, Amdt 3 Cancelled
Clinton, IA, Clinton Muni, NDB or GPS RWY 14, Amdt 3
De Quincy, LA, De Quincy Industrial Airpark, VOR/DME or GPS RWY 33, 
Orig Cancelled
De Quincy, LA, De Quincy Industrial Airpark, VOR/DME RWY 33, Orig
De Quincy, LA, De Quincy Industrial Airpark, NDB or GPS RWY 15, Amdt 
1 Cancelled
De Quincy, LA, De Quincy Industrial Airpark, NDB RWY 15, Amdt 1
Opelousas, LA, St Landry Parish-Ahart Field, VOR/DME or GPS RWY 35, 
Orig-A Cancelled
Opelousas, LA, St Landry Parish-Ahart Field, VOR/DME RWY 35, Orig-A
Kaiser/Lake Ozark, MO, Lee C. Fine Memorial, NDB or GPS RWY 21, Amdt 
6 Cancelled
Kaiser/Lake Ozark, MO, Lee C. Fine Memorial, NDB RWY 21, Amdt 6
Albemarle, NC, Stanly County, NDB or GPS RWY 22, Orig.
Alamogordo, NM, Alamogordo-While Sands Regional, VOR or GPS RWY 3, 
Orig Cancelled
Alamogordo, NM, Alamogordo-While Sands Regional, VOR RWY 3, Orig
Las Vegas, NM, Las Vegas Muni, VOR or GPS RWY 2, Amdt 10A Cancelled
Las Vegas, NM, Las Vegas Muni, VOR RWY 2, Amdt. 10A
Las Vegas, NM, Las Vegas Muni, VOR or GPS RWY 20, Amdt 5A Cancelled
Las Vegas, NM, Las Vegas Muni, VOR RWY 20, Amdt 5A
Taos, NM, Taos Muni, NDB or GPS RWY 4, Orig-A Cancelled
Taos, NM, Taos Muni, NDB RWY 4, Orig-A
Zuni Pueblos, NM, Black Rock, VOR/DME or GPS RWY 7, Amdt 1 Cancelled
Zuni Pueblo, NM, Black Rock, VOR/DME RWY 7, Amdt 1
Burnet, TX, Burnet Muni Kate Craddock Field, NDB or GPS RWY 1, Amdt 
3 Cancelled
Burnet, TX, Burnet Muni Kate Craddock Field, NDB RWY 1, Amdt 3
Dumas, TX, Moore County, VOR/DME RNAV or GPS RWY 19, Amdt 3 
Cancelled
Dumas, TX, Moore County, VOR/DME RNAV RWY 19, Amdt 3
Houston, TX, Houston Intercontinental, NDB or GPS RWY 26, Amdt 1A 
Cancelled
Houston, TX, Houston Intercontinental, NDB RWY 26, Amdt 1A

[FR Doc. 96-4689 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-4688 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7700-7702]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4688]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28476; Amdt. No. 1713]

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of 
changes occurring in the National Airspace System, such as the 
commissioning of new navigational facilities, addition of new 
obstacles, or changes in air traffic requirements. These changes are 
designed to provide safe and efficient use of the navigable airspace 
and to promote safe flight operations under instrument flight rules at 
the affected airports.

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference--approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matter incorporated by reference in the 
amendment is as follows:

For Examination

    1. FAA Rules Docket, FAA Headquarters Building, 800 Independence 
Avenue. SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which affected airport 
is located; or
    3. The Flight Inspection Area Office which originated the SIAP.

For Purchase

    Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or
    2. The FAA Regional Office of the region in which the affected 
airport is located.

By Subscription

    Copies of all SIAPs, mailed once every 2 weeks, are for sale by the 

[[Page 7701]]
Superintendent of Documents, US Government Printing Office, Washington, 
DC 20402.

FOR FURTHER INFORMATION CONTACT:
Paul J. Best, Flight Procedures Standards Branch (AFS-420), Technical 
Programs Division, Flight Standards Service, Federal Aviation 
Administration, 800 Independence Avenue, SW., Washington, DC 20591; 
telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description on each SIAP is contained in the appropriate FAA 
Form 8260 and the National Flight Data Center (FDC)/Permanent (P) 
Notices to Airmen (NOTAM) which are incorporated by reference in the 
amendment under 5 U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the 
Federal Aviation Regulations (FAR). Materials incorporated by reference 
are available for examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction of charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.

The Rule

    This amendment to part 97 of the Federal Aviation Regulations (14 
CFR part 97) establishes, amends, suspends, or revokes SIAPs. For 
safety and timeliness of change considerations, this amendment 
incorporates only specific changes contained in the content of the 
following FDC/P NOTAM for each SIAP. The SIAP information in some 
previously designated FDC/Temporary (FDC/T) NOTAMs is of such duration 
as to be permanent. With conversion to FDC/P NOTAMs, the respective 
FDC/T NOTAMs have been cancelled.
    The FDC/P NOTAMs for the SIAPs contained in this amendment are 
based on the criteria contained in the U.S. Standard for Terminal 
Instrument Approach Procedures (TERPS). In developing these chart 
changes to SIAPs by FDC/P NOTAMs, the TERPS criteria were applied to 
only these specific conditions existing at the affected airports. All 
SIAP amendments in this rule have been previously issued by the FAA in 
a National Flight Data Center (FDC) Notice to Airmen (NOTAM) as an 
emergency action of immediate flight safety relating directly to 
published aeronautical charts. The circumstances which created the need 
for all these SIAP amendments requires making them effective in less 
than 30 days.
    Further, the SIAPs contained in this amendment are based on the 
criteria contained in the TERPS. Because of the close and immediate 
relationship between these SIAPs and safety in air commerce, I find 
that notice and public procedure before adopting these SIAPs are 
impracticable and contrary to the public interest and, where 
applicable, that good cause exists for making these SIAPs effective in 
less than 30 days.

Conclusion

    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air Traffic Control, Airports, Navigation (Air).

    Issued in Washington, DC on February 23, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

    Authority: 49 U.S.C. 40103, 40113, 40120, 44701; 49 U.S.C. 
106(g); and 14 CFR 11.49(b)(2).

    2. Part 97 is amended to reads as follows:

Secs. 97.23, 97.25, 97.27, 97.29, 97.31, 97.33, 97.35  [Amended]

    By amending: Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME or 
TACAN; Sec. 97.25 LOC, LOC/DME, LDA, LDA/DME, SDF, SDF/DME; Sec. 97.27 
NDB, NDB/DME; Sec. 97.29 ILS, ILS/DME, ISMLS, MLS, MLS/DME, MLS/RNAV; 
Sec. 97.31 RADAR SIAPs; Sec. 97.33 RNAV SIAPs; and Sec. 97.35 COPTER 
SIAPs, identified as follows:

* * * Effective Upon Publication

--------------------------------------------------------------------------------------------------------------------------------------------------------
       FDC date             State               City                 Airport                FDC No.                             SIAP                    
--------------------------------------------------------------------------------------------------------------------------------------------------------
02/09/96.............  TN               Memphis.............  Memphis Intl........  FDC 6/0926              ILS RWY 36L AMDT 11. . .                    
02/09/96.............  TX               Fort Worth..........  Fort Worth Meacham    FDC 6/0929              ILS RWY 16L, AMDT 5. . .                    
                                                               Intl.                                                                                    
02/10/96.............  WV               Lewisburg...........  Greenbrier Valley...  FDC 6/0955              ILS RWY 4 AMDT 7A. . .                      
02/12/96.............  TX               Fort Worth..........  Fort Worth Meacham    FDC 6/0973              NDB OR GPS RWY 16L, AMDT 3. . .             
                                                               Intl.                                                                                    
02/12/96.............  TX               Fort Worth..........  Fort Worth Meacham    FDC 6/0974              NDB OR GPS RWY 34R, AMDT 5. . .             
                                                               Intl.                                                                                    
02/13/96.............  MN               Brainerd............  Brainerd-Crow Wing    FDC 6/0999              ILS RWY 23 AMDT 4. . .                      
                                                               County Regional.                                                                         
02/13/96.............  MN               Brainerd............  Brainerd-Crow Wing    FDC 6/1000              VOR/DME RWY 12 AMDT 8. . .                  
                                                               County Regional.                                                                         
02/14/96.............  MN               Cambridge...........  Cambridge Muni......  FDC 6/1009              NDB OR GPS RWY 34 AMDT 6. . .               

[[Page 7702]]
                                                                                                                                                        
02/14/96.............  NE               Falls City..........  Brenner Field.......  FDC 6/1017              NDB OR GPS-A, AMDT 3. . .                   
02/14/96.............  TX               Fort Worth..........  Fort Worth Meacham    FDC 6/1023              LOC BC RWY 34R, AMDT 7. . .                 
                                                               Intl.                                                                                    
02/15/96.............  CA               Lakeport............  Lampson Field.......  FDC 6/1036              NDB OR GPS-A ORIG-A. . .                    
02/20/96.............  CA               Victorville.........  Southern California   FDC 6/1111              ILS RWY 17 ORIG. . .                        
                                                               Intl.                                                                                    
--------------------------------------------------------------------------------------------------------------------------------------------------------

FR Doc. 96-4688 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-4687 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7698-7699]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4687]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28475; Amdt. No. 1712]

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of the 
adoption of new or revised criteria, or because of changes occurring in 
the National Airspace System, such as the commissioning of new 
navigational facilities, addition of new obstacles, or changes in air 
traffic requirements. These changes are designed to provide safe and 
efficient use of the navigable airspace and to promote safe flight 
operations under instrument flight rules at the affected airports.

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference--approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matters incorporated by reference in the 
amendment is as follows:
    For Examination--
    1. FAA Rules Docket, FAA Headquarters Building, 800 Independence 
Avenue, SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which the affected 
airport is located; or
    3. The Flight Inspection Area Office which originated the SIAP.
    For Purchase--Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or
    2. The FAA Regional Office of the region in which the affected 
airport is located.
    By Subscription--Copies of all SIAPs, mailed once every 2 weeks, 
are for sale by the Superintendent of Documents, U.S. Government 
Printing Office, Washington, DC 20402.

FOR FURTHER INFORMATION CONTACT:
Paul J. Best, Flight Procedures Standards Branch (AFS-420), Technical 
Programs Division, Flight Standards Service, Federal Aviation 
Administration, 800 Independence Avenue SW., Washington, DC 20591; 
telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description of each SIAP is contained in official FAA form 
documents which are incorporated by reference in this amendment under 5 
U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the Federal Aviation 
Regulations (FAR). The applicable FAA Forms are identified as FAA Forms 
8260-3, 8260-4, and 8260-5. Materials incorporated by reference are 
available for examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction on charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.

The Rule

    The amendment to part 97 is effective upon publication of each 
separate SIAP as contained in the transmittal. Some SIAP amendments may 
have been previously issued by the FAA in a National Flight Data Center 
(FDC) Notice to Airmen (NOTAM) as an emergency action of immediate 
flight safety relating directly to published aeronautical charts. The 
circumstances which created the need for some SIAP amendments may 
require making them effective in less than 30 days. For the remaining 
SIAPs, an effective date at least 30 days after publication is 
provided.
    Further, the SIAPs contained in this amendment are based on the 
criteria contained in the U.S. Standard for Terminal Instrument 
Approach Procedures (TERPS). In developing these SIAPs, the TERPS 
criteria were applied to the conditions existing or anticipated at the 
affected airports. Because of the close and immediate relationship 
between these SIAPs and safety in air commerce, I find that notice and 
public procedure before adopting these SIAPs are impracticable and 
contrary to the public interest and, where applicable, that good cause 
exists for making some SIAPs effective in less than 30 days.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air Traffic Control, Airports, Navigation (Air).

    Issued in Washington, DC on February 23, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120, 44701; and 14 
CFR 11.49(b)(2).

    2. Part 97 is amended to read as follows:

Sec. 97.23, Sec. 97.25, Sec. 97.27, Sec. 97.29, Sec. 97.31, Sec. 97.33, 
Sec. 97.35--[Amended]

    By amending: Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME 

[[Page 7699]]
    or TACAN; Sec. 97.25 LOC, LOC/DME, LDA, LDA/DME, SDF, SDF/DME; 
Sec. 97.27 NDB, NDB/DME; Sec. 97.29 ILS, ILS/DME, ISMLS, MLS, MLS/DME, 
MLS/RNAV; Sec. 97.31 RADAR SIAPs; Sec. 97.33 RNAV SIAPs; and Sec. 97.35 
COPTER SIAPs, identified as follows:

* * * Effective April 25, 1996

Searcy, AR, Searcy Municipal, GPS RWY 19, Amdt 1
Mesa, AZ, Falcon Fld, GPS RWY 4R, Orig
Colorado Springs, CO, City of Colorado Springs Muni, GPS RWY 17L, 
Orig
Colorado Springs, CO, City of Colorado Springs Muni, GPS RWY 35L, 
Orig
Colorado Springs, CO, City of Colorado Springs Muni, GPS RWY 35R, 
Orig
Rifle, CO, Garfield County Regional, GPS RWY 8, Orig
Kokomo, IN, Kokomo Muni, VOR or GPS RWY 32, Amdt 19
Kokomo, IN, Kokomo Muni, VOR/DME or GPS RWY 23, Amdt 19
Kokomo, IN, Kokomo Muni, ILS RWY 23, Amdt 8
Kokomo, IN, Kokomo Muni, VOR/DME RNAV or GPS RWY 5, Amdt 5
De Quincy, LA, De Quincy Industrial Airpark, GPS RWY 15, Orig
De Quincy, LA, De Quincy Industrial Airpark, GPS RWY 33, Orig
Eunice, LA, Eunice, GPS RWY 34, Orig
Opelousas, LA, St Landry Parish-Ahart Field, GPS RWY 35, Orig
Winnfield, LA, David G. Joyce, GPS RWY 26, Orig
Big Rapids, MI, Roben-Hood, VOR/DME or GPS-A, Amdt 7
Winona, MN, Winona Muni-Max Conrad Field, GPS RWY 29, Orig
Lovelock, NV, Derby Field, GPS RWY 1, Orig
Alamogordo, NM, Alamogorado-White Sands Regional, GPS RWY 3, Orig
Clovis, NM, Clovis Muni, GPS RWY 30, Orig
Tucumcari, NM, Tucumcari Muni, GPS RWY 3, Orig
Zuni Pueblo, NM, Black Rock, GPS RWY 7, Orig
Portland, OR, Portland Intl, LOC/DME RWY 10L, Orig
Dayton, TN, Mark Anton, GPS RWY 21, Orig
Burnet, TX, Burnet Muni Kate Craddock Field, GPS RWY 1, Orig
Clarksville, VA, Marks Muni, VOR/DME-A, Orig
Fond Du Lac, WI, Fond Du Lac County, GPS RWY 36, Orig

* * * Effective Upon Publication

Hagerstown, MD, Washington County Regional, ILS RWY 27, Amdt 7
Santa Fe, NM, Santa Fe County Muni, VOR/DME-A, Amdt 1
Santa Fe, NM, Santa Fe County Muni, VOR OR GPS RWY 33, Amdt 9
Santa Fe, NM, Santa Fe County Muni, NDB RWY 2, Amdt 4
Santa Fe, NM, Santa Fe County Muni, ILS RWY 2, Amdt 5

    Note: The FAA published procedures in Docket No. 28461; Amdt. 
No. 1710 to Part 97 of the Federal Aviation Regulations (VOL. 61 FR 
No. 33 Page 6108; dated Feb. 16, 1996) under Section 97.31 which are 
hereby amended as follows:

Charlotte, NC, Charlotte/Douglas Intl, RADAR-1, Amdt 19A, CANCELLED; 
Effective 25 APR 96.
Gastonia, NC, Gastonia Muni, RADAR-1 Amdt 4A, CANCELLED; Effective 
28 MAR 96.

[FR Doc. 96-4687 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-4686 Medical Standards and Certification
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7695-7697]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4686]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 67
[Docket No. 27890]
RIN 2120-AF42

Medical Standards and Certification

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; disposition of comments.

-----------------------------------------------------------------------

SUMMARY: On September 9, 1994, the Federal Aviation Administration 
(FAA) issued an emergency final rule amending the general medical 
standard for first-, second-, and third-class airman medical 
certificates. The FAA, in the same document, sought public comment on 
the final rule. This document disposes of the comments received in 
response to that rule.

[[Page 7696]]

ADDRESSES: Comments submitted in response to this rulemaking may be 
examined at the Federal Aviation Administration, Office of the Chief 
Counsel, Rules Docket, room 915-G, 800 Independence Avenue SW., 
Washington, DC, weekdays (except Federal holidays) between 830 a.m. and 
5 p.m.

FOR FURTHER INFORMATION CONTACT:
Tina Lombard, Aeromedical Standards Branch, (AAM-210), Office of 
Aviation Medicine, Federal Aviation Administration, 800 Independence 
Avenue SW., Washington, DC 20591; telephone (202) 267-9655.

SUPPLEMENTARY INFORMATION:

Background

    The general medical standard for the three classes of airman 
medical certificates is detailed in part 67 of Title 14 of the Code of 
Federal Regulations (14 CFR part 67). A first-class medical certificate 
is required to exercise the privileges of an airline transport pilot 
certificate, while second- and third-class medical certificates are 
required to exercise the privileges of commercial and private pilot 
certificates, respectively. An applicant who is found to meet the 
appropriate medical standards is entitled to a medical certificate 
without restrictions other than the limit of its duration as prescribed 
in 14 CFR part 67.
    An applicant may be ineligible for certification under 
Secs. 67.13(f)(2), 67.15(f)(2), or 67.17(f)(2) if that person has an 
organic, functional, or structural disease, defect, or limitation that 
the Federal Air Surgeon finds: (1) makes the applicant unable to safely 
perform the duties or exercise the privileges of the airman certificate 
the applicant holds or for which the applicant is applying, or (2) may 
reasonably be expected within 2 years of Federal Air Surgeon's finding 
to make the applicant unable to safely perform those duties or exercise 
those privileges.
    Paragraph (f)(2) of Secs. 67.13, 67.15, and 67.17 provides the 
historical basis for denying medical certification in cases where the 
Federal Air Surgeon has determined that an applicant's medication or 
other treatment (including prescription, over-the-counter, and 
nontraditional medication or other treatment remedies) interferes with 
the applicant's ability to safely perform the duties, or exercise the 
privileges, of the airman certificate for which the airman is applying 
or holds.
    Notwithstanding the FAA's long-standing medical certification 
policy and practice regarding medication and other treatment, the U.S. 
Court of Appeals for the Seventh Circuit determined that paragraph 
(f)(2) did not provide a basis for denial of medical certification 
based on medication alone. Bullwinkel v. Federal Aviation 
Administration, 23 F.3d 167, (7th Cir., reh'g. denied). The Seventh 
Circuit's decision that medication alone was not covered by paragraph 
(f)(2) raised serious safety concerns within the FAA. As a result of 
those concerns, the FAA on September 9, 1994, promulgated an emergency 
final rule that was immediately effective to clarify and codify the 
FAA's policy regarding an individual who holds, or is applying for, an 
airman medical certificate in a case where medication or other 
treatment was found to interfere, or may reasonably be expected to 
interfere, with that individual's ability to safely perform airman 
duties (57 FR 46706).
    The September 9, 1994, emergency final rule amended paragraph (f) 
of Secs. 67.13, 67.15, and 67.17 by adding to each a new paragraph (3), 
which sets out the standard for certification where medication or other 
treatment is involved. Each paragraph (f)(3) made ineligible for 
unrestricted medical certification any applicant whose medication or 
other treatment is found by the Federal Air Surgeon to make, or may 
reasonably be expected to make with 2 years after the finding, that 
applicant unable to safely perform the duties or exercise the 
privileges of his or her airman certificate. The final rule did not 
change the FAA's current and long-standing application of the medical 
certification standards. Rather, its sole purpose was to expressly 
codify the agency's practice in light of the Bullwinkel decision.
    Also, for continuity with the current administration of other 
medical certification procedures, reference to this emergency final 
rule was added by revising Sec. 67.25, Delegation of authority, and 
Sec. 67.27, Denial of medical certificate.
    The FAA invited public comment on the final rule and established a 
60-day comment period, which closed on November 8, 1994.

Discussion of Comments

    The FAA received six comments in response to the emergency final 
rule; four comments opposed and two comments supported the rule. The 
commenters included five individuals and one association, the Aerospace 
Medical Association (ASMA).
    One commenter states that the FAA was wrong to amend the rules 
because of a single case. The commenter suggests that a better standard 
would be to list those drugs in the regulations that would be 
considered automatically disqualifying or potentially disqualifying.
    One commenter characterizes the rule as a major change and objects 
to it being issued as a final rule without prior public comment. He 
suggests that the FAA rescind the final rule and schedule the subject 
for a notice of proposed rulemaking.
    One commenter states that his third-class medical certificate was 
revoked because he was taking a medication to control symptoms of 
bipolar disorder. He contends that the matter of disqualification 
should be based solely on the underlying medical condition. He further 
contends that medication can control symptoms for approximately 80 
percent of people with the disorder. The commenter concludes that 
patients taking certain medications for bipolar disorder are 
``effectively cured'' of the underlying condition and should be 
eligible for medical certification.
    One commenter states that there was no cause for issuing an 
emergency rule and that the FAA's policy was shown in court to be 
contrary to law. He contends that the FAA's choice of rulemaking 
procedure was improper. Further, he objects that the September 9, 1994, 
final rule does not specify the names of all disqualifying medication 
or treatment which the rule encompasses. He states that the rule 
enables the FAA to make judgments which may be arbitrary or 
unreasonable. The commenter suggests that this rulemaking action should 
have been contained in an overall revision of parts 61 and 67.
    The ASMA states that it strongly supports the final rule. Further, 
the ASMA concurs with the dissenting opinion in the Bullwinkel case in 
that the general medical standard of the airman medical standards 
should be viewed as including all elements of medicine, i.e., 
medication and other treatments.
    One commenter agrees with the FAA's action but expresses concern 
about the change in the rules without benefit of prior public comment.

FAA Response

    The FAA's rationale for issuing this emergency final rule is fully 
set out in the preamble to the rule published at 59 FR 46706 on 
September 9, 1994.
    As stated in the preamble to the final rule, the FAA determined an 
emergency existed that required immediate action; that determination is 
unchanged by the comments. A delay could have had an adverse effect on 
aviation safety. Neither a notice of proposed rulemaking nor 
incorporation of the amendment into a possible part 67 revision, as 
proposed 

[[Page 7697]]
by commenters, was determined to be in the public interest.
    As to the commenters' call for a ``list'' of disqualifying 
medications, the Federal Air Surgeon has determined that an exhaustive 
``listing'' of specific medications or specific treatments to determine 
an airman's eligibility is not possible. All the positive and negative 
effects of any medication or treatment are rarely appreciated when 
first introduced. In some cases, substantial amounts of time may pass 
before a particular drug or treatment can be judged with confidence, 
particularly with its application to individuals in the aviation 
environment. Because of the continuous changes in the field of medicine 
and pharmacology, the FAA has determined that publishing a static list 
of disqualifying medication is not appropriate or practical.
    In case where an individual has been determined to have a 
disqualifying condition and/or use a disqualifying medication or other 
treatment and requests special issuance of a medical certificate, the 
Federal Air Surgeon considers not only all relevant scientific data on 
the particular condition and/or medication or other treatment but also 
the individual's particular situation and the role that he/she will 
perform in aviation. The case-by-case review can and does result in 
instances where the particular condition and/or medication or other 
treatment precludes the affected individual from receiving even an 
individually tailored special issuance medical certificate. Conversely, 
with the availability of new data and experience, some similarly 
affected individuals may, by adjustments in their medication dosage or 
other treatment, or restrictions in their privileges, for example, 
receive special issuance of medical certificates.
    Because this careful analysis of each special issuance case is 
frequently not fully appreciated, the perception exists that many 
conditions and/or medications or other treatment are always 
disqualifying. In fact, with the availability of new data and 
experience, the Federal Air Surgeon has found it safe to issue special 
medical certificates to the majority of those individuals who 
historically were always denied. But, as there are literally hundreds 
of diagnoses, medications, and other treatments, as well as thousands 
of combinations that frequently change over time, the FAA cannot, as a 
practical matter, produce a ``list'' of medications and/or treatments 
that would be considered disqualifying or, conversely, acceptable for 
airman medical certification.
    While at any point in time there may be treatment and medications 
that preclude the special issuance of a medical certificate, the FAA 
will continue to seek public comment, when appropriate, as it has done 
recently concerning insulin-using diabetics (see 59 FR 67426, September 
29, 1994), to assist the Federal Air Surgeon in formulating policy on 
the special issuance of medical certificates.
    Finally, the Bullwinkel decision highlighted a deficit in FAA 
procedures that the emergency final rule has now corrected; the agency 
does not view the decision as finding the policy and practice of the 
FAA to be ``contrary to law'' as characterized by one commenter. The 
rule change clarifies and resolves any previous ambiguity in FAA's 
medical standards regarding medication and/or other treatment.

Conclusion

    Accordingly, after careful consideration of all the comments 
submitted, the FAA has determined that no further rulemaking action is 
warranted.

    Issued in Washington, DC, on February 23, 1996.
Jon L. Jordan,
Federal Air Surgeon.
[FR Doc. 96-4686 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-4679 Streamlining Public Housing Maintenance and Operation Rules
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7966-7973]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4679]

      

[[Page 7965]]

_______________________________________________________________________

Part IX

Department of Housing and Urban Development

_______________________________________________________________________

Office of the Assistant Secretary for Community Planning and 
Development

_______________________________________________________________________

24 CFR Part 965

Streamlining Public Housing Maintenance and Operation Rules; Final Rule

Federal Register / Vol. 61, No. 41 / Thursday, February 29, 1996 / 
Rules and Regulations 

[[Page 7966]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Office of the Assistant Secretary for Public and Indian Housing

24 CFR Part 965

[Docket No. FR-3928-F-02]
RIN 2577-AB55

Streamlining Public Housing Maintenance and Operation Rules

AGENCY: Office of the Assistant Secretary for Public and Indian 
Housing, HUD.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule amends HUD's regulations in 24 CFR part 965 on 
public housing maintenance and operations to streamline and simplify 
necessary requirements and to eliminate unnecessary requirements. This 
final rule takes into consideration comments received on the September 
25, 1995 proposed rule.

EFFECTIVE DATE: April 29, 1996.

FOR FURTHER INFORMATION CONTACT: William C. Thorson, Director, 
Administration and Maintenance Division, Office of Public Housing 
Management, Room 4214, U.S. Department of Housing and Urban 
Development, 451 Seventh Street, SW, Washington, DC 20410. Telephone 
(202) 708-4703; Hearing- or speech-impaired persons may use the 
Telecommunications Devices for the Deaf (TDD) by contacting the Federal 
Information Relay Service on 1-800-877-TDDY (1-800-877-8339) or (202) 
708-9300. (Other than the ``800'' TDD number, the telephone numbers are 
not toll-free.)

SUPPLEMENTARY INFORMATION:

I. Background

    In accordance with President Clinton's regulatory reinvention 
efforts and Executive Order 12866 (Regulatory Planning and Review) 
issued by President Clinton on September 30, 1993, HUD commenced a 
comprehensive review of all of its regulations to determine which 
regulations could be eliminated and streamlined. One such review was 
with respect to 24 CFR 965, PHA-Owned or Leased Projects-Maintenance 
and Operation.
    HUD published a proposed rule on September 25, 1995 (60 FR 49480) 
announcing its intention to (1) eliminate one subpart F--Modernization 
of Oil Fired Heating Plants, (2) simplify and revise subpart C--Energy 
Audits and Energy Conservation Measures, subpart D--Individual Metering 
of Utilities for Existing PHA-Owned Projects, and subpart E--Tenant 
Allowances for Utilities, (3) consolidate two subparts, subpart A--
Preemption of State Prevailing Wage Requirements With Respect to 
Maintenance and Operation and subpart H--Lead- Based Paint Poisoning 
Prevention, applicable to other housing programs in a new ``general'' 
part that will be applicable to all programs, (4) revise subpart I--
Fire Safety at a later date to reflect new statutory requirements and 
(5) make only a minor technical change to subpart B--Required Insurance 
Coverage.

II. Differences Between This Final Rule and September 25, 1995 Proposed 
Rule

    Intervening events have changed the need for some of these changes. 
Subpart F was removed by another rulemaking that eliminated obsolete 
provisions, 61 FR 47263. Subpart A is being amended by a pending 
rulemaking that focuses primarily on streamlining public and Indian 
housing modernization regulations. Therefore, this final rule focuses 
on making the changes to simplify subparts C, D, and E.
    Four changes were made at this final rule stage to the revisions 
proposed in the rule published on September 25, 1995.
    1. The Department has revised Sec. 965.407 to require that PHAs 
with mastermeter systems must reevaluate these systems by making a 
cost-benefit analysis at least every 5 years. The final rule changes 
the period from 36 months to 5 years to be consistent with the energy 
audit and the Comprehensive Grant Program five year plan.
    2. The Department has revised Sec. 965.503 to streamline the 
paragraph by eliminating the unnecessary language in the last sentence 
which goes beyond the basic requirement.
    3. The Department has revised Sec. 965.504(b) to streamline the 
paragraph by eliminating unnecessary descriptive language beyond the 
basic requirement.
    4. The Department has revised Sec. 965.507(b) to clarify that 
increases in utility allowances due to rate changes are not subject to 
the 60-day notice requirement in Sec. 965.502(c).

III. Discussion of Public Comments on Proposed Rule

    The Department received public comments from ten organizations 
(seven public housing agencies (PHAs), one PHA trade organization and 
two labor organizations) in response to the September 25, 1995 proposed 
rule. One PHA commended HUD's efforts in simplifying part 965, 
recommending no revisions. The following discussion summarizes the 
remaining comments and provides HUD's responses to those comments.

Subpart A--Preemption of State Prevailing Wage Requirements With 
Respect to Maintenance and Operation of Projects

    Comment: While two PHAs concurred with the decision to retain this 
subpart, two labor organizations strongly objected. Both organizations 
cited their opposition to the rule when it was originally issued in 
1988. They contended that lower rates do not equate to lower project 
costs and that the capacity of the U.S. Department of Labor to produce 
timely and accurate wage reports is questionable because of budget 
cuts. One organization also suggested that the rule creates an unfunded 
mandate upon the States.
    Response: The Department appreciates the positions of the two labor 
organizations. However, the Department points out that this issue was 
the subject of considerable debate at the time the proposed and final 
rules were issued in 1987/1988. It was also, as one of the 
organizations correctly pointed out, challenged in the courts. The 
court found in favor of the Department. The Department continues to 
believe that the rule is in the best interest of the program and 
declines to eliminate this subpart.

Subpart C--Energy Audits and Energy Conservation Measures

    Comment: One PHA and a PHA trade organization suggested that HUD 
should not require all PHAs, regardless of size or performance, to 
conduct energy audits and undertake energy conservation measures. The 
commenter suggested that standard and high performing PHAs and PHAs 
with fewer than 250 units should be exempt unless there is evidence 
that intervention by HUD is required on energy conservation issues. 
Alternatively, it was recommended that if HUD requires all PHAs to 
conduct the described activities, it should guarantee funding. Another 
PHA raised similar concerns about funding of audits.
    Response: First, it should be noted that HUD pays operating 
subsidies through the Performance Funding System (PFS) (24 CFR part 
990) for HAs that are not able to cover all operating costs, including 
utilities, through rents charged to residents. Currently, the utility 
component of the operating subsidy now exceeds $1 billion annually. The 
appropriation for operating subsidy for Fiscal Years 1994 and 1995 was 
only sufficient to fund 

[[Page 7967]]
PHAs at 95 and 96 percent, respectively, of their eligibility level. It 
is not guaranteed that future appropriations will result in a higher 
percentage funding. Hence, the Department must ensure that PHAs conduct 
audits as one means of holding down operating costs, including the cost 
of utilities, and ensuring that the limited funds available for 
operations are used as efficiently as possible.
    It is erroneous to assume that a designation as a standard or high 
performer under the Public Housing Management Assessment Program 
automatically equates to having a good energy management program. HUD's 
Office of Inspector General (OIG) recently completed an Audit Report 
entitled ``Review of Opportunities To Reduce Utility Costs At Public 
Housing Authorities.'' The OIG report was based on visits to 
approximately 63 PHAs, which manage 41 percent of the 1.3 million 
public housing units nationally. The OIG indicated that despite past 
efforts:

    Opportunities for reducing utility costs continue to exist and 
are cost effective in many instances due to ongoing improvements in 
technology. Housing authority managers need to be aware of, 
evaluate, and give maximum consideration to these ongoing and new 
opportunities when managing their utility costs. Because of 
improvements in technology, managing utilities is a continuous 
process that requires an ongoing energy management program.

    The purpose of an energy audit is to identify the types and costs 
of energy use in order to understand how energy is being used and to 
identify and analyze alternatives that could substantially reduce 
costs. PHAs that are effectively managing their utility consumption are 
going through a dynamic process--evaluating current usage, implementing 
recommendations for energy cost savings, and monitoring the results. A 
good energy audit process can provide a PHA with many benefits and 
insights and does not have to be very complex. In fact, some utility 
companies do energy audits for free.
    The Department views a regularly scheduled audit to be an essential 
tool in reducing operating costs for PHAs and the Federal government. 
Since the Federal government is paying the cost of operations, 
including the utility costs, and the technology is constantly evolving, 
it is reasonable and cost effective to require periodic energy audits 
by all PHAs, regardless of size or performance. The Department 
considers five year intervals to be the maximum time between regularly 
scheduled audits, given the continuous changes that are occurring in 
the energy industry.
    It should be further noted that the requirement to perform an audit 
is not new. It has been in the existing regulation for more than a 
decade. The existing regulation required an audit within 36 months from 
the effective date of the regulation (which was published in 1980) and 
prior to a PHA's application for Comprehensive Modernization. The 
proposed rule simply updates the existing requirement for the audit to 
establish regular intervals when audits must be done.
    HUD has eliminated most of the process-oriented requirements (e.g., 
most of the requirements in the current Secs. 965.303 and 965.304) in 
favor of a results-oriented requirement (e.g., an audit performed in 
accordance with State requirements). HUD also has eliminated the 
provision in Sec. 965.302 of the proposed rule involving HUD approval 
of energy audit standards.
    A PHA can, as one commenter recommended, do the energy audit in 
conjunction with its five-year action plan which is required for the 
Comprehensive Grant Program. The modernization regulations are being 
amended to require the incorporation of the energy conservation 
measures resulting from an audit performed under this subpart.
    With regard to the funding of energy audits, the Department 
believes that a sound energy management program is fundamental to good 
property management and that energy audits are a cost of doing business 
that should be included as a part of an agency's operating budget. For 
that reason, the final rule, in keeping with the existing rule, 
provides that the audit is to be paid out of operating funds to the 
extent feasible, and, where operating funds are insufficient, the cost 
of the audit is an eligible cost for inclusion in a modernization 
program. The Department disagrees that this existing requirement 
represents an unfunded mandate.
    The Department recommends that PHAs give serious consideration to 
Secs. 965.305(b) and 965.308 of this rule. These sections, and the 
applicable sections of part 990, provide incentives for PHAs to 
undertake energy improvements through energy performance contracts 
using non-HUD financing. Under this arrangement, a PHA may contract 
with an energy service company to do an audit of its properties and 
submit a proposal for the installation of energy conservation measures 
using non-HUD financing. If the proposal is approved by HUD, HUD will 
freeze the three year rolling base in the utility component of the PFS 
for the utilities involved. The PHA must use at least 50 percent of the 
consumption savings to pay debt service on the non-HUD financing, 
retaining any balance.
    The PHA benefits three ways from such an arrangement: (1) It 
generates additional income from the savings not used for debt service 
payments; (2) energy improvements are shifted from the PHA's 
modernization program to non-HUD financing, thus, enabling the PHA to 
do more work with its limited modernization funds; and (3) the PHA is 
able to provide a better environment for its residents. As pointed out 
in the OIG report, ``energy efficiency can become a competitive 
advantage for housing authorities who want to attract residents through 
increased resident comfort and decreased operating costs.'' Effective 
energy use becomes a more critical issue as the public housing 
community faces drastic changes in the nature of how they are funded 
and operate. More information regarding energy performance contracting 
and incentives to reduce utility costs is contained in HUD Notice PIH 
95-26, issued April 28, 1995.
    Comment: The PHA trade organization suggested that if HUD continues 
to require energy audits of all PHAs, it should not require that HUD 
review and pre-approve all energy performance contracts, especially for 
standard and high-performing PHAs. Instead, the organization suggests 
that the review of such contracts should be part of the independent 
public accountant (IPA) process, as the Department proposes for the 
calculation of resident utility allowances.
    Response: Energy performance contracting is relatively new in the 
public housing community and involves a more sophisticated two-step 
procurement process that most PHAs have not used and are not familiar 
with. Further, HUD must agree that the proposed savings will 
materialize and be sufficient to amortize the debt service in order to 
commit the Department to freezing the utility component of the PFS for 
periods of up to 12 years. This represents a significant financial 
investment on the part of the government. For these reasons, the 
Department is retaining the pre-approval of energy performance 
contracts.
    Comment: One PHA recommended that HUD should develop criteria to 
determine which housing authorities are in need of an energy audit. HUD 
should evaluate a housing authority's energy performance by comparing 
consumption and cost to a standard. This evaluation would determine 
which housing 

[[Page 7968]]
authorities need to conduct an energy audit. The PHA contends that PHAs 
send in so many reports and information to HUD that the energy 
performance of a housing authority could be determined by HUD.
    Response: As noted above, energy audits are an essential part of an 
ongoing energy management system. Technology is constantly changing, 
and it is necessary to have properties reevaluated on a regular basis. 
The recommendation is to rely on HUD to make a determination after the 
PHA has been determined to be energy inefficient. The Department does 
not believe that this is an effective management approach, particularly 
given dwindling resources for PHAs and HUD.
    Further, the Department does receive consumption information for 
PHAs in conjunction with the PFS. The information reflects gross 
consumption and is not broken down by individual projects or buildings, 
both of which can vary significantly. HUD also requests utility 
information in conjunction with its routine monitoring. Such monitoring 
is done only on a limited basis. As noted above, the Department does 
not believe that it is a good management practice for PHAs to wait for 
HUD to determine energy efficiency. Given the cost to the Department 
for operations, including utilities, it will retain the audit 
requirement which has been in effect since 1980.

Subpart D--Individual Metering of Utilities for Existing PHA-Owned 
Projects

    Comment: One PHA indicated that residents should be required to pay 
for utilities and that the PHA should charge a modest rent based on the 
number of bedrooms in the unit.
    Response: The Department agrees that individual metering is an 
important component of a complete energy management system for property 
managers. However, conversions should only be mandatory if they are 
cost effective, and this subpart is written accordingly. The payment of 
rent by public housing residents is, by law, based on income and is not 
addressed by this rule.
    Comment: One PHA indicated that it agrees that individual metering 
is advisable, but that PHAs are capable of implementing these steps 
independent of HUD regulation. The PHA questions the change in the 
requirement in the existing rule which advises the PHA to consult with 
residents, whereas the proposed rule makes such consultation mandatory.
    Response: The Department agrees that many PHAs are capable of 
implementing the provisions contained in the rule. However, it is also 
true that many PHAs are reluctant to do so to avoid confrontational 
situations with the residents and the possibility of litigation which 
has accompanied such conversions in the past. Also, HUD pays the 
utility costs in these cases and needs to ensure that the conversions 
are accomplished where it is cost effective to do so. Because of the 
cost to the Federal government, the Department is retaining this 
requirement. With regard to consultation, residents are both the PHA's 
and the Department's ultimate customer. The Department believes the 
conversion to individual metering, while a good management practice, 
will nevertheless significantly impact the residents and, therefore, 
they must be consulted.
    Comment: One PHA noted the requirement in Sec. 965.407 for PHAs 
with mastermeter systems to reevaluate these systems by making a cost-
benefit analysis at least every 36 months. The PHA recommends a five-
year cycle to be consistent with the energy audit and the Comprehensive 
Grant Program five year plan.
    Response: The Department agrees with this recommendation and has 
made the revision in the final rule.

Subpart E--Resident Allowances for Utilities

    Comment: One PHA noted that a HUD Field Office did a Utility Review 
and made a finding because it was not surcharging residents for water 
for a washing machine. The PHA indicates that it felt that it had a 
right to determine what appliances required surcharges but notes that 
the regulation does not specifically mention washing machines. The PHA 
also recommended that we specifically exempt elderly high rises in the 
South from the requirement to charge residents for the energy to use a 
PHA-furnished air conditioner. In the instant case, the individual 
units had heat pumps for each unit which provide heat and air 
conditioning. The PHA did not think it was possible to establish fair 
surcharges because some run the air conditioning all the time while 
others only run the air conditioning occasionally.
    Response: The Department agrees that if laundromats are not 
available, washing machines in units are reasonable, but not without 
limitation. As has been described above, the amount of operating 
subsidies is limited. It is, therefore, essential that PHAs undertake 
measures to conserve energy. One such way is to establish an allowance 
``which reflects a reasonable consumption of utilities by an energy-
conservative household of modest circumstances * * *.'' If the utility 
is paid by the PHA and the resident exceeds the allowance, the resident 
must be surcharged for the excess consumption. The regulation provides 
PHAs with considerable latitude in the development of allowances, 
within the basic framework described above. The Department plans to 
issue a guidebook in the near future to assist PHAs in developing 
utility allowances.
    There is considerable debate as to the extent to which air 
conditioning should be considered an essential component. As noted 
earlier, the cost of utilities is in excess of $1 billion annually. 
Appropriations for the last two years have been, and for the 
foreseeable future, will be, insufficient to fund PHAs at 100 percent 
of their eligibility under the PFS. Including air conditioning in 
utility allowances beyond what is already specifically authorized would 
seriously and adversely impact the level of funding for other critical 
services such as maintenance. This will affect all PHAs around the 
nation, since it will reduce the overall amount of operating subsidy 
which is fixed. The Department's approach to this difficult issue is to 
allow the capital costs to be an eligible expense while requiring the 
resident to pay the costs of the energy associated with its use. The 
Department is retaining the language in Sec. 965.505(e) as described in 
the proposed rule.
    Comment: Two PHAs indicate that HUD's criteria for establishing 
utility allowances as required in Sec. 965.505(d)(1) through (9) should 
be simplified. One PHA indicated that the nine factors that must be 
taken into account have intimidated many PHAs into commissioning 
expensive engineering studies in an effort to comply. The PHA suggests 
that the language be simplified to allow for the use of previous 
consumption histories. Another PHA suggested that the factors be 
advisory.
    Response: As noted in Sec. 965.505(c), the Department leaves the 
complexity and elaborateness of the methods for establishing utility 
allowances to the discretion of the PHA. HUD believes that the choice 
in methodology is best handled at the local level where the PHA can use 
a procedure suitable to available data and local experience. As such, 
the rule does not intend to require only the use of the engineering 
method to establish allowances. While the Department believes that the 
engineering method will more closely approximate the objective stated 
in 

[[Page 7969]]
Sec. 965.505(a), the consumption method is acceptable and may be 
appropriate for some PHAs. The Department believes that the ``factors'' 
cited, which have been in effect for more than a decade, are reasonable 
and necessary to be ``considered'' regardless of the methodology used 
in order to meet the objective in Sec. 965.505(a).
    Comment: One PHA indicated that Sec. 965.507 states that utility 
allowances must be revised if the rate changes more than 10 percent 
between annual reviews. Utility rates can be volatile, particularly if 
a housing authority purchases a utility, such as natural gas, directly 
from the well-head. This could necessitate changing utility allowances 
several times during a twelve month period. The PHA recommends revision 
only on an annual basis. This PHA, along with others, indicated that if 
HUD wants PHAs to be competitive in the housing market, air 
conditioning must be considered a legitimate cost and should be 
included in the utility allowances.
    Response: To the extent that the market is volatile, any savings/
cost should be passed along to the resident. The Department previously 
discussed the financial impact of including air conditioning in utility 
allowances. No changes are being made to this section.
    Comment: One PHA noted an apparent inconsistency. Specifically, 
Sec. 965.502(c) requires residents to receive a 60-day notice of any 
change to the utility allowances. Section 965.507(b), on the other 
hand, requires that in cases of increases in utility allowances due to 
rate changes, adjustments shall be effective the first day of the month 
following the month in which the last rate change taken into account in 
such revision became effective. The PHA suggested that it appears that 
increases due to rate changes are not subject to the 60-day notice 
requirement contained in Sec. 965.502(c).
    Response: The PHA is correct that revisions due to rate changes 
pursuant to Sec. 965.507(b) are not subject to the 60 day notice 
requirement. The Department has added clarifying language.

Other Matters

Environmental Impact

    A Finding of No Significant Impact with respect to the environment 
for this rule was made at the proposed rule stage in accordance with 
HUD regulations at 24 CFR part 50, which implement section 102(2)(C) of 
the National Environmental Policy Act of 1969. The Finding of No 
Significant Impact remains applicable to this final rule and is 
available for public inspection between 7:30 a.m. and 5:30 p.m. 
weekdays in the Office of the Rules Docket Clerk, Office of the General 
Counsel, Department of Housing and Urban Development, Room 10276, 451 
Seventh Street, SW., Washington, DC 20410.

Regulatory Flexibility Act

    The Secretary, in accordance with the Regulatory Flexibility Act (5 
U.S.C. 605(b)), has reviewed this rule before publication and by 
approving it certifies that this rule would not have a significant 
economic impact on a substantial number of small entities because the 
rule reduces and streamlines existing requirements. PHAs will have 
fewer mandatory requirements. No new additional requirements are being 
imposed by this rule.

Executive Order 12612, Federalism

    The General Counsel, as the Designated Official under section 6(a) 
of Executive Order 12612, Federalism, has determined that this rule 
does not have ``federalism implications'' because it does not have 
substantial direct effect on the States (including their political 
subdivisions), or on the distribution of power and responsibilities 
among the various levels of government.

Executive Order 12606, The Family

    The General Counsel, as the Designated Official under Executive 
Order 12606, The Family, has determined that the rule will not have a 
significant impact on family formation, maintenance, and well being, 
and, therefore, is not subject to review under the order. No 
significant changes in existing HUD policies or programs will result 
from promulgation of this rule as those policies and programs relate to 
family concerns.

Catalog of Federal Domestic Assistance

    The Catalog of Federal Domestic Assistance Program number assigned 
to this program is 14.850.

List of Subjects in 24 CFR Part 965

    Energy conservation, Government procurement, Grant programs--
housing and community development, Lead poisoning, Loan programs--
housing and community development, Public housing, Reporting and 
recordkeeping requirements, Utilities.

    Accordingly, 24 CFR part 965 is amended as follows:

PART 965--PHA-OWNED OR LEASED PROJECTS--MAINTENANCE AND OPERATION

    1. The authority citation for part 965 continues to read as 
follows:

    Authority: 42 U.S.C. 1437, 1437a, 1437d, 1437g, and 3535(d). 
Subpart H is also issued under 42 U.S.C. 4821-4846.

Sec. 965.205  [Amended]

    2. In subpart B, in Sec. 965.205, paragraph (a) is amended by 
removing the parenthetical phrase ``(in section 305 of the ACC)'' from 
the first sentence that immediately follows the paragraph heading.
    3. Subpart C is revised to read as follows:

Subpart C--Energy Audits and Energy Conservation Measures

Sec.
965.301  Purpose and applicability.
965.302  Requirements for energy audits.
965.303  [Reserved].
965.304  Order of funding.
965.305  Funding.
965.306  Energy conservation equipment and practices.
965.307  Compliance schedule.
965.308  Energy performance contracts.

Subpart C--Energy Audits and Energy Conservation Measures

Sec. 965.301  Purpose and applicability.

    (a) Purpose. The purpose of this subpart C is to implement HUD 
policies in support of national energy conservation goals by requiring 
PHAs to conduct energy audits and undertake certain cost-effective 
energy conservation measures.
    (b) Applicability. The provisions of this subpart apply to all PHAs 
with PHA-owned housing, but they do not apply to Indian Housing 
Authorities. (For similar provisions applicable to Indian housing, see 
part 950 of this chapter.) No PHA-leased project or Section 8 Housing 
Assistance Payments Program project, including a PHA-owned Section 8 
project, is covered by this subpart.

Sec. 965.302  Requirements for energy audits.

    All PHAs shall complete an energy audit for each PHA-owned project 
under management, not less than once every five years. Standards for 
energy audits shall be equivalent to State standards for energy audits. 
Energy audits shall analyze all of the energy conservation measures, 
and the payback period for these measures, that are pertinent to the 
type of buildings and equipment operated by the PHA. 

[[Page 7970]]

Sec. 965.303  [Reserved]

Sec. 965.304  Order of funding.

    Within the funds available to a PHA, energy conservation measures 
should be accomplished with the shortest pay-back periods funded first. 
A PHA may make adjustments to this funding order because of 
insufficient funds to accomplish high-cost energy conservation measures 
(ECM) or where an ECM with a longer pay-back period can be more 
efficiently installed in conjunction with other planned modernization. 
A PHA may not install individual utility meters that measure the energy 
or fuel used for space heating in dwelling units that need substantial 
weatherization, when installation of meters would result in economic 
hardship for residents. In these cases, the ECMs related to 
weatherization shall be accomplished before the installation of 
individual utility meters.

Sec. 965.305  Funding.

    (a) The cost of accomplishing cost-effective energy conservation 
measures, including the cost of performing energy audits, shall be 
funded from operating funds of the PHA to the extent feasible. When 
sufficient operating funds are not available for this purpose, such 
costs are eligible for inclusion in a modernization program, for 
funding from any available development funds in the case of projects 
still in development, or for other available funds that HUD may 
designate to be used for energy conservation.
    (b) If a PHA finances energy conservation measures from sources 
other than modernization or operating reserves, such as a loan from a 
utility entity or a guaranteed savings agreement with a private energy 
service company, HUD may agree to provide adjustments in its 
calculation of the PHA's operating subsidy eligibility under the PFS 
for the project and utility involved based on a determination that 
payments can be funded from the reasonably anticipated energy cost 
savings (See Sec. 990.107(g) of this chapter).

Sec. 965.306  Energy conservation equipment and practices.

    In purchasing original or, when needed, replacement equipment, PHAs 
shall acquire only equipment that meets or exceeds the minimum 
efficiency requirements established by the U.S. Department of Energy. 
In the operation of their facilities, PHAs shall follow operating 
practices directed to maximum energy conservation.

Sec. 965.307  Compliance schedule.

    All energy conservation measures determined by energy audits to be 
cost effective shall be accomplished as funds are available.

Sec. 965.308  Energy performance contracts.

    (a) Method of procurement. Energy performance contracting shall be 
conducted using one of the following methods of procurement:
    (1) Competitive proposals (see 24 CFR 85.36(d)(3)). In identifying 
the evaluation factors and their relative importance, as required by 
Sec. 85.36(d)(3)(i) of this title, the solicitation shall state that 
technical factors are significantly more important than price (of the 
energy audit); or
    (2) If the services are available only from a single source, 
noncompetitive proposals (see 24 CFR 85.36(d)(4)(i)(A)).
    (b) HUD Review. Solicitations for energy performance contracting 
shall be submitted to the HUD Field Office for review and approval 
prior to issuance. Energy performance contracts shall be submitted to 
the HUD Field Office for review and approval before award.
    4. Subpart D is revised to read as follows:

Subpart D--Individual Metering of Utilities for Existing PHA-Owned 
Projects

Sec.
965.401  Individually metered utilities.
965.402  Benefit/cost analysis.
965.403  Funding.
965.404  Order of conversion.
965.405  Actions affecting residents.
965.406  Benefit/cost analysis for similar projects.
965.407  Reevaluations of mastermeter systems.

Subpart D--Individual Metering of Utilities for Existing PHA-Owned 
Projects

Sec. 965.401  Individually metered utilities.

    (a) All utility service shall be individually metered to residents, 
either through provision of retail service to the residents by the 
utility supplier or through the use of checkmeters, unless:
    (1) Individual metering is impractical, such as in the case of a 
central heating system in an apartment building;
    (2) Change from a mastermetering system to individual meters would 
not be financially justified based upon a benefit/cost analysis; or
    (3) Checkmetering is not permissible under State or local law, or 
under the policies of the particular utility supplier or public service 
commission.
    (b) If checkmetering is not permissible, retail service shall be 
considered. Where checkmetering is permissible, the type of individual 
metering offering the most savings to the PHA shall be selected.

Sec. 965.402  Benefit/cost analysis.

    (a) A benefit/cost analysis shall be made to determine whether a 
change from a mastermetering system to individual meters will be cost 
effective, except as otherwise provided in Sec. 965.405.
    (b) Proposed installation of checkmeters shall be justified on the 
basis that the cost of debt service (interest and amortization) of the 
estimated installation costs plus the operating costs of the 
checkmeters will be more than offset by reduction in future utilities 
expenditures to the PHA under the mastermeter system.
    (c) Proposed conversion to retail service shall be justified on the 
basis of net savings to the PHA. This determination involves making a 
comparison between the reduction in utility expense obtained through 
eliminating the expense to the PHA for PHA-supplied utilities and the 
resultant allowance for resident-supplied utilities, based on the cost 
of utility service to the residents after conversion.

Sec. 965.403  Funding.

    The cost to change mastermeter systems to individual metering of 
resident consumption, including the costs of benefit/cost analysis and 
complete installation of checkmeters, shall be funded from operating 
funds of the PHA to the extent feasible. When sufficient operating 
funds are not available for this purpose, such costs are eligible for 
inclusion in a modernization project or for funding from any available 
development funds.

Sec. 965.404  Order of conversion.

    Conversions to individually metered utility service shall be 
accomplished in the following order when a PHA has projects of two or 
more of the designated categories, unless the PHA has a justifiable 
reason to do otherwise, which shall be documented in its files.
    (a) In projects for which retail service is provided by the utility 
supplier and the PHA is paying all the individual utility bills, no 
benefit/cost analysis is necessary, and residents shall be billed 
directly after the PHA adopts revised payment schedules providing 
appropriate allowances for resident-supplied utilities.
    (b) In projects for which checkmeters have been installed but are 
not being utilized as the basis for determining utility charges to the 
residents, no benefit/cost analysis is necessary. The checkmeters shall 
be used as the basis for utility charges, and residents shall be 
surcharged for excess utility use.
    (c) Projects for which meter loops have been installed for 
utilization of 

[[Page 7971]]
checkmeters shall be analyzed both for the installation of checkmeters 
and for conversion to retail service.
    (d) Low- or medium-rise family units with a mastermeter system 
should be analyzed for both checkmetering and conversion to retail 
service, because of their large potential for energy savings.
    (e) Low- or medium-rise housing for the elderly should next be 
analyzed for both checkmetering and conversion to retail service, since 
the potential for energy saving is less than for family units.
    (f) Electric service under mastermeters for high-rise buildings, 
including projects for the elderly, should be analyzed for both use of 
retail service and of checkmeters.

Sec. 965.405  Actions affecting residents.

    (a) Before making any conversion to retail service, the PHA shall 
adopt revised payment schedules, providing appropriate allowances for 
the resident-supplied utilities resulting from the conversion.
    (b) Before implementing any modifications to utility services 
arrangements with the residents or charges with respect thereto, the 
PHA shall make the requisite changes in resident dwelling leases in 
accordance with 24 CFR part 966.
    (c) PHAs must work closely with resident organizations, to the 
extent practicable, in making plans for conversion of utility service 
to individual metering, explaining the national policy objectives of 
energy conservation, the changes in charges and rent structure that 
will result, and the goals of achieving an equitable structure that 
will be advantageous to residents who conserve energy.
    (d) A transition period of at least six months shall be provided in 
the case of initiation of checkmeters, during which residents will be 
advised of the charges but during which no surcharge will be made based 
on the readings. This trial period will afford residents ample notice 
of the effects the checkmetering system will have on their individual 
utility charges and also afford a test period for the adequacy of the 
utility allowances established.
    (e) During and after the transition period, PHAs shall advise and 
assist residents with high utility consumption on methods for reducing 
their usage. This advice and assistance may include counseling, 
installation of new energy conserving equipment or appliances, and 
corrective maintenance.

Sec. 965.406  Benefit/cost analysis for similar projects.

    PHAs with more than one project of similar design and utilities 
service may prepare a benefit/cost analysis for a representative 
project. A finding that a change in metering is not cost effective for 
the representative project is sufficient reason for the PHA not to 
perform a benefit/cost analysis on the remaining similar projects.

Sec. 965.407  Reevaluations of mastermeter systems.

    Because of changes in the cost of utility services and the periodic 
changes in utility regulations, PHAs with mastermeter systems are 
required to reevaluate mastermeter systems without checkmeters by 
making benefit/cost analyses at least every 5 years. These analyses may 
be omitted under the conditions specified in Sec. 965.406.
    5. Subpart E is revised to read as follows:

Subpart E--Resident Allowances for Utilities

Sec.
965.501  Applicability.
965.502  Establishment of utility allowances by PHAs.
965.503  Categories for establishment of allowances.
965.504  Period for which allowances aare established.
965.505  Standards for allowances for utilities.
965.506  Surcharges for excess consumption of PHA-furnished 
utilities.
965.507  Review and revision of allowances.
965.508  Individual relief.

Subpart E--Resident Allowances for Utilities

Sec. 965.501  Applicability.

    (a) This subpart E applies to public housing, including the Turnkey 
III Homeownership Opportunities program. This subpart E also applies to 
units assisted under sections 10(c) and 23 of the U. S. Housing Act of 
1937 (42 U.S.C. 1437 et seq.) as in effect before amendment by the 
Housing and Community Development Act of 1974 (12 U.S.C. 1706e) and to 
which 24 CFR part 900 is not applicable. This subpart E does not apply 
to Indian housing projects (see 24 CFR part 950).
    (b) In rental units for which utilities are furnished by the PHA 
but there are no checkmeters to measure the actual utilities 
consumption of the individual units, residents shall be subject to 
charges for consumption by resident-owned major appliances, or for 
optional functions of PHA-furnished equipment, in accordance with 
Sec. 965.502(e) and 965.506(b), but no utility allowance will be 
established.

Sec. 965.502  Establishment of utility allowances by PHAs.

    (a) PHAs shall establish allowances for PHA-furnished utilities for 
all checkmetered utilities and allowances for resident-purchased 
utilities for all utilities purchased directly by residents from the 
utilities suppliers.
    (b) The PHA shall maintain a record that documents the basis on 
which allowances and scheduled surcharges, and revisions thereof, are 
established and revised. Such record shall be available for inspection 
by residents.
    (c) The PHA shall give notice to all residents of proposed 
allowances, scheduled surcharges, and revisions thereof. Such notice 
shall be given, in the manner provided in the lease or homebuyer 
agreement, not less than 60 days before the proposed effective date of 
the allowances or scheduled surcharges or revisions; shall describe 
with reasonable particularity the basis for determination of the 
allowances, scheduled surcharges, or revisions, including a statement 
of the specific items of equipment and function whose utility 
consumption requirements were included in determining the amounts of 
the allowances or scheduled surcharges; shall notify residents of the 
place where the PHA's record maintained in accordance with paragraph 
(b) of this section is available for inspection; and shall provide all 
residents an opportunity to submit written comments during a period 
expiring not less than 30 days before the proposed effective date of 
the allowances or scheduled surcharges or revisions. Such written 
comments shall be retained by the PHA and shall be available for 
inspection by residents.
    (d) Schedules of allowances and scheduled surcharges shall not be 
subject to approval by HUD before becoming effective, but will be 
reviewed in the course of audits or reviews of PHA operations.
    (e) The PHA's determinations of allowances, scheduled surcharges, 
and revisions thereof shall be final and valid unless found to be 
arbitrary, capricious, an abuse of discretion, or otherwise not in 
accordance with the law.

Sec. 965.503  Categories for establishment of allowances.

    Separate allowances shall be established for each utility and for 
each category of dwelling units determined by the PHA to be reasonably 
comparable as to factors affecting utility usage.

Sec. 965.504  Period for which allowances are established.

    (a) PHA-furnished utilities. Allowances will normally be 
established on a quarterly basis; however, residents may be surcharged 
on a monthly basis. The allowances 

[[Page 7972]]
established may provide for seasonal variations.
    (b) Resident-purchased utilities. Monthly allowances shall be 
established. The allowances established may provide for seasonal 
variations.

Sec. 965.505  Standards for allowances for utilities.

    (a) The objective of a PHA in designing methods of establishing 
utility allowances for each dwelling unit category and unit size shall 
be to approximate a reasonable consumption of utilities by an energy-
conservative household of modest circumstances consistent with the 
requirements of a safe, sanitary, and healthful living environment.
    (b) Allowances for both PHA-furnished and resident-purchased 
utilities shall be designed to include such reasonable consumption for 
major equipment or for utility functions furnished by the PHA for all 
residents (e.g., heating furnace, hot water heater), for essential 
equipment whether or not furnished by the PHA (e.g., range and 
refrigerator), and for minor items of equipment (such as toasters and 
radios) furnished by residents.
    (c) The complexity and elaborateness of the methods chosen by the 
PHA, in its discretion, to achieve the foregoing objective will depend 
upon the nature of the housing stock, data available to the PHA and the 
extent of the administrative resources reasonably available to the PHA 
to be devoted to the collection of such data, the formulation of 
methods of calculation, and actual calculation and monitoring of the 
allowances.
    (d) In establishing allowances, the PHA shall take into account 
relevant factors affecting consumption requirements, including:
    (1) The equipment and functions intended to be covered by the 
allowance for which the utility will be used. For instance, natural gas 
may be used for cooking, heating domestic water, or space heating, or 
any combination of the three;
    (2) The climatic location of the housing projects;
    (3) The size of the dwelling units and the number of occupants per 
dwelling unit;
    (4) Type of construction and design of the housing project;
    (5) The energy efficiency of PHA-supplied appliances and equipment;
    (6) The utility consumption requirements of appliances and 
equipment whose reasonable consumption is intended to be covered by the 
total resident payment;
    (7) The physical condition, including insulation and 
weatherization, of the housing project;
    (8) Temperature levels intended to be maintained in the unit during 
the day and at night, and in cold and warm weather; and
    (9) Temperature of domestic hot water.
    (e) If a PHA installs air conditioning, it shall provide, to the 
maximum extent economically feasible, systems that give residents the 
option of choosing to use air conditioning in their units. The design 
of systems that offer each resident the option to choose air 
conditioning shall include retail meters or checkmeters, and residents 
shall pay for the energy used in its operation. For systems that offer 
residents the option to choose air conditioning, the PHA shall not 
include air conditioning in the utility allowances. For systems that 
offer residents the option to choose air conditioning but cannot be 
checkmetered, residents are to be surcharged in accordance with 
Sec. 965.506. If an air conditioning system does not provide for 
resident option, residents are not to be charged, and these systems 
should be avoided whenever possible.

Sec. 965.506  Surcharges for excess consumption of PHA-furnished 
utilities.

    (a) For dwelling units subject to allowances for PHA-furnished 
utilities where checkmeters have been installed, the PHA shall 
establish surcharges for utility consumption in excess of the 
allowances. Surcharges may be computed on a straight per unit of 
purchase basis (e.g., cents per kilowatt hour of electricity) or for 
stated blocks of excess consumption, and shall be based on the PHA's 
average utility rate. The basis for calculating such surcharges shall 
be described in the PHA's schedule of allowances. Changes in the dollar 
amounts of surcharges based directly on changes in the PHA's average 
utility rate shall not be subject to the advance notice requirements of 
this section.
    (b) For dwelling units served by PHA-furnished utilities where 
checkmeters have not been installed, the PHA shall establish schedules 
of surcharges indicating additional dollar amounts residents will be 
required to pay by reason of estimated utility consumption attributable 
to resident-owned major appliances or to optional functions of PHA-
furnished equipment. Such surcharge schedules shall state the resident-
owned equipment (or functions of PHA-furnished equipment) for which 
surcharges shall be made and the amounts of such charges, which shall 
be based on the cost to the PHA of the utility consumption estimated to 
be attributable to reasonable usage of such equipment.

Sec. 965.507  Review and revision of allowances.

    (a) Annual review. The PHA shall review at least annually the basis 
on which utility allowances have been established and, if reasonably 
required in order to continue adherence to the standards stated in 
Sec. 965.505, shall establish revised allowances. The review shall 
include all changes in circumstances (including completion of 
modernization and/or other energy conservation measures implemented by 
the PHA) indicating probability of a significant change in reasonable 
consumption requirements and changes in utility rates.
    (b) Revision as a result of rate changes. The PHA may revise its 
allowances for resident-purchased utilities between annual reviews if 
there is a rate change (including fuel adjustments) and shall be 
required to do so if such change, by itself or together with prior rate 
changes not adjusted for, results in a change of 10 percent or more 
from the rates on which such allowances were based. Adjustments to 
resident payments as a result of such changes shall be retroactive to 
the first day of the month following the month in which the last rate 
change taken into account in such revision became effective. Such rate 
changes shall not be subject to the 60 day notice requirement of 
Sec. 965.502(c).

Sec. 965.508  Individual relief.

    Requests for relief from surcharges for excess consumption of PHA-
purchased utilities, or from payment of utility supplier billings in 
excess of the allowances for resident-purchased utilities, may be 
granted by the PHA on reasonable grounds, such as special needs of 
elderly, ill or disabled residents, or special factors affecting 
utility usage not within the control of the resident, as the PHA shall 
deem appropriate. The PHA's criteria for granting such relief, and 
procedures for requesting such relief, shall be adopted at the time the 
PHA adopts the methods and procedures for determining utility 
allowances. Notice of the availability of such procedures (including 
identification of the PHA representative with whom initial contact may 
be made by residents), and the PHA's criteria for granting such relief, 
shall be included in each notice to residents given in accordance with 
Sec. 965.502(c) and in the information given to new residents upon 
admission.

[[Page 7973]]

    Dated: February 22, 1996.
MaryAnn Russ,
Acting Assistant Secretary for Public and Indian Housing.
[FR Doc. 96-4679 Filed 2-28-96; 8:45 am]
BILLING CODE 4210-33-P

Complete official Federal Register PDF

FR Doc. 96-4678 Regulatory Reinvention: Streamlining the Housing Opportunities for Persons With AIDS Program
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7962-7964]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4678]

[[Page 7961]]

_______________________________________________________________________

Part VIII

Department of Housing and Urban Development

_______________________________________________________________________

Office of the Assistant Secretary for Community Planning and 
Development

_______________________________________________________________________

24 CFR Part 574

Regulatory Reinvention: Streamlining the Housing Opportunities for 
Persons With AIDS Program; Final Rule

Federal Register / Vol. 61, No. 41 / Thursday, February 29, 1996 / 
Rules and Regulations 

[[Page 7962]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Office of the Assistant Secretary for Community Planning and 
Development

24 CFR Part 574

[Docket No. FR-4030-F-01]
RIN 2506-AB78

Regulatory Reinvention: Streamlining the Housing Opportunities 
for Persons With AIDS Program

AGENCY: Office of the Assistant Secretary for Community Planning and 
Development, HUD.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule amends HUD's regulations for the Housing 
Opportunities for Persons With AIDS (HOPWA) program. In an effort to 
comply with the President's regulatory reform initiatives, this rule 
will streamline the HOPWA regulations by eliminating provisions that 
are duplicative of statutes or are otherwise unnecessary. This final 
rule will make the regulations more concise.

EFFECTIVE DATE: April 1, 1996.

FOR FURTHER INFORMATION CONTACT: Fred Karnas, Jr., Director, Office of 
HIV/AIDS Housing, Room 7154, Department of Housing and Urban 
Development, 451 Seventh Street, SW, Washington, DC 20410, telephone 
number (202) 708-1934 (this is not a toll-free number). A 
telecommunications device for hearing- and speech-impaired persons 
(TDD) is available at 1-800-877-8339 (Federal Information Relay 
Service).

SUPPLEMENTARY INFORMATION: On March 4, 1995, President Clinton issued a 
memorandum to all Federal departments and agencies regarding regulatory 
reinvention. In response to this memorandum, the Department of Housing 
and Urban Development conducted a page-by-page review of its 
regulations to determine which can be eliminated, consolidated, or 
otherwise improved. HUD has determined that the regulations for the 
HOPWA Program can be improved and streamlined by eliminating 
unnecessary provisions.
    Several provisions in the regulations repeat statutory language 
from the AIDS Housing Opportunity Act (42 U.S.C. 12901). It is 
unnecessary to maintain statutory requirements in the Code of Federal 
Regulations (CFR), since those requirements are otherwise fully 
accessible and binding. Furthermore, if regulations contain statutory 
language, HUD must amend the regulations whenever Congress amends the 
statute. Therefore, this final rule removes repetitious statutory 
language and replaces it with a citation to the specific statutory 
section for easy reference.
    Similarly, the environmental review procedures section 
(Sec. 574.510) contains language that repeats requirements that are 
stated in 24 CFR 50.3. Therefore, that section is being revised to 
remove the repetitive language and substitute a cross-reference to the 
applicable provision in that existing rule. Removal of this language 
does not alter the procedures to be followed.
    In addition, some provisions in the regulations are not regulatory 
requirements. For example, several sections in the regulations contain 
nonbinding guidance or explanations. While this information is very 
helpful to recipients, HUD will more appropriately provide this 
information through handbook guidance or other materials rather than 
maintain it in the CFR.
    Lastly, two changes are being made to rectify an oversight when the 
part was recently revised as part of a larger rulemaking (see 61 FR 
5198, February 9, 1996). The waiver provision (Sec. 574.4) is removed, 
since Departmental waivers were consolidated at 24 CFR part 5. The 
section dealing with nondiscrimination (Sec. 574.603) is being revised 
to reinsert language limiting the application of the provision to 
persons who are otherwise eligible for the program, i.e., persons who 
have AIDS or related diseases and their families.

Justification for Final Rulemaking

    HUD generally publishes a rule for public comment before issuing a 
rule for effect, in accordance with its own regulations on rulemaking 
in 24 CFR part 10. However, part 10 provides for exceptions to the 
general rule if the agency finds good cause to omit advance notice and 
public participation. The good cause requirement is satisfied when 
prior public procedure is ``impracticable, unnecessary, or contrary to 
the public interest'' (24 CFR 10.1). HUD finds that good cause exists 
to publish this rule for effect without first soliciting public 
comment. This rule merely removes unnecessary regulatory provisions and 
does not establish or affect substantive policy. Therefore, prior 
public comment is unnecessary.

Other Matters

Regulatory Flexibility Act

    The Secretary, in accordance with the Regulatory Flexibility Act (5 
U.S.C. 605(b)), has reviewed and approved this final rule, and in so 
doing certifies that this rule will not have a significant economic 
impact on a substantial number of small entities. This rule merely 
streamlines regulations by removing unnecessary provisions. The rule 
will have no adverse or disproportionate economic impact on small 
businesses.

Environmental Impact

    This rulemaking does not have an environmental impact. This 
rulemaking simply amends an existing regulation by consolidating and 
streamlining provisions. It does not change the environmental review 
procedures or the physical impact of the program or the projects 
assisted under the regulations being amended. A Finding of No 
Significant Impact with respect to the environment was made in 
accordance with HUD regulations in 24 CFR part 50 that implement 
section 102(2)(C) of the National Environmental Policy Act of 1969 (42 
U.S.C. 4332) at the time of development of regulations implementing the 
HOPWA program. That finding remains applicable to this rule and is 
available for public inspection between 7:30 a.m. and 5:30 p.m. 
weekdays in the Office of the Rules Docket Clerk, Office of General 
Counsel, Room 10276, Department of Housing and Urban Development, 451 
Seventh Street, SW, Washington, DC.

Executive Order 12612, Federalism

    The General Counsel, as the Designated Official under section 6(a) 
of Executive Order 12612, Federalism, has determined that this rule 
will not have substantial direct effects on States or their political 
subdivisions, or the relationship between the Federal government and 
the States, or on the distribution of power and responsibilities among 
the various levels of government. No programmatic or policy changes 
will result from this rule that would affect the relationship between 
the Federal Government and State and local governments.

Executive Order 12606, The Family

    The General Counsel, as the Designated Official under Executive 
Order 12606, The Family, has determined that this rule will not have 
the potential for significant impact on family formation, maintenance, 
or general well-being, and thus is not subject to review under the 
Order. No significant change in existing HUD policies or programs will 
result from promulgation of this rule.

List of Subjects in 24 CFR Part 574

    AIDS, Community facilities, Disabled, Emergency shelter, Grant 
programs--health programs, Grant programs--housing and community 
development, 

[[Page 7963]]
Grant programs--social programs, Homeless, Housing, Low and moderate 
income housing, Nonprofit organizations, Rent subsidies, Reporting and 
recordkeeping requirements, Technical assistance.
    Accordingly, part 574 of title 24 of the Code of Federal 
Regulations is amended, as follows:

PART 574--HOUSING OPPORTUNITIES FOR PERSONS WITH AIDS

    1. The authority citation for part 574 continues to read as 
follows:

    Authority: 42 U.S.C. 3535(d) and 12901-12912.

Sec. 574.1  [Removed]

    2. Section 574.1 is removed.

Sec. 574.2  [Removed]

    3. Section 574.2 is removed.
    4. In Sec. 574.3, the definitions for ``City'', ``Low-income 
individual'', ``Metropolitan statistical area'', ``Project sponsor'', 
and ``State'' are revised to read as follows:

Sec. 574.3  Definitions.

* * * * *
    City has the meaning given it in section 102(a) of the Housing and 
Community Development Act of 1974 (42 U.S.C. 5302).
* * * * *
    Low-income individual has the meaning given it in section 853(3) of 
the AIDS Housing Opportunity Act (42 U.S.C. 12902).
    Metropolitan statistical area has the meaning given it in section 
853(5) of the AIDS Housing Opportunity Act (42.U.S.C. 12902).
* * * * *
    Project sponsor means any nonprofit organization or governmental 
housing agency that receives funds under a contract with the grantee to 
carry out eligible activities under this part. The selection of project 
sponsors is not subject to the procurement requirements of 24 CFR 
85.36.
* * * * *
    State has the meaning given it in section 853(9) of the AIDS 
Housing Opportunity Act (42 U.S.C. 12902).
* * * * *

Sec. 574.4  [Removed]

    5. Section 574.4 is removed.
    6. Section 574.110 is added, to read as follows:

Sec. 574.110  Overview of formula allocations.

    The formula grants are awarded upon submission and approval of a 
consolidated plan, pursuant to 24 CFR part 91, that covers the 
assistance to be provided under this part. Certain states and cities 
that are the most populous unit of general local government in eligible 
metropolitan statistical areas will receive formula allocations based 
on their State or metropolitan population and proportionate number of 
cases of persons with AIDS. They will receive funds under this part 
(providing they comply with 24 CFR part 91) for eligible activities 
that address the housing needs of persons with AIDS or related diseases 
and their families (see Sec. 574.130(b)).

Sec. 574.150  [Removed]

    7. Section 574.150 is removed.
    8. Section 574.200 is amended by adding paragraphs (c) and (d), to 
read as follows:

Sec. 574.200  Amounts available for competitive grants.

* * * * *
    (c) The competitive grants are awarded based on applications, as 
described in subpart C of this part, submitted in response to a Notice 
of Funding Availability published in the Federal Register. All States 
and units of general local government and nonprofit organizations are 
eligible to apply for competitive grants to fund projects of national 
significance. Only those States and units of general local government 
that do not qualify for formula allocations are eligible to apply for 
competitive grants to fund other projects.
    (d) If HUD makes a procedural error in a funding competition that, 
when corrected, would warrant funding of an otherwise eligible 
application, HUD will select that application for potential funding 
when sufficient funds become available.

Sec. 574.230  [Removed]

    9. Section 574.230 is removed.
    10. Section 574.240 is revised to read as follows:

Sec. 574.240  Application requirements.

    Applications must comply with the provisions of the Department's 
Notice of Funding Availability (NOFA) for the fiscal year published in 
the Federal Register in accordance with 24 CFR part 12. The rating 
criteria, including the point value for each, are described in the 
NOFA, including criteria determined by the Secretary.

Sec. 574.250  [Removed]

    11. Section 574.250 is removed.

Sec. 574.310  [Amended]

    12. In Sec. 574.310, paragraph (d) is amended by removing from the 
introductory text the words, ``determined in accordance with section 
3(a) of the United States Housing Act of 1937 and 24 CFR 813.106. Under 
these authorities, each resident must pay as rent'', and adding in 
their place the words, ``which is''.
    13. In Sec. 574.320, paragraph (b) is revised to read as follows:

Sec. 574.320  Additional standards for rental assistance.

* * * * *
    (b) With respect to shared housing arrangements, the rent charged 
for an assisted family or individual shall be in relation to the size 
of the private space for that assisted family or individual in 
comparison to other private space in the shared unit, excluding common 
space. An assisted family or individual may be assigned a pro rata 
portion based on the ratio derived by dividing the number of bedrooms 
in their private space by the number of bedrooms in the unit. 
Participation in shared housing arrangements shall be voluntary.
    14. Section 574.510 is revised to read as follows:

Sec. 574.510  Environmental procedures and standards.

    Before any amounts under this program are used to acquire, 
rehabilitate, convert, lease, repair or construct properties to provide 
housing, HUD shall perform a review in accord with 24 CFR part 50, 
which implements the National Environmental Policy Act and the related 
Federal environmental laws and authorities listed under 24 CFR 50.4. In 
performing its environmental review, HUD may use previously issued 
environmental reviews prepared by other local, State, or federal 
agencies for the proposed property. The grantee will cooperate in 
providing these documents. HUD must, however, conduct the environmental 
analysis and prepare the environmental review and be responsible for 
the required environmental findings. An environmental assurance shall 
be provided by an applicant for formula allocations or competitive 
awards in accordance with 24 CFR 50.3(i).
    15. Section 574.540 is revised to read as follows:

Sec. 574.540  Deobligation of funds.

    HUD may deobligate all or a portion of the amounts approved for 
eligible activities if such amounts are not expended in a timely 
manner, or the proposed activity for which funding was approved is not 
provided in accordance with the approved application or action plan and 
the requirements of this regulation. HUD may deobligate any 

[[Page 7964]]
amount of grant funds that have not been expended within a three-year 
period from the date of the signing of the grant agreement. The grant 
agreement may set forth other circumstances under which funds may be 
deobligated or sanctions imposed.
    16. Section 574.603 is amended by revising the introductory text, 
to read as follows:

Sec. 574.603  Nondiscrimination and equal opportunity.

    Within the population eligible for this program, the 
nondiscrimination and equal opportunity requirements set forth in 24 
CFR part 5 and the following requirements apply:
* * * * *
    Dated: February 21, 1996.
Andrew M. Cuomo,
Assistant Secretary for Community Planning and Development.
[FR Doc. 96-4678 Filed 2-28-96; 8:45 am]
BILLING CODE 4210-29-P

Complete official Federal Register PDF

FR Doc. 96-4666 Community Development Financial Institutions Program; Bank Enterprise Award Program; Correction
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Page 7690]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4666]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Community Development Financial Institutions Fund

12 CFR Parts 1805 and 1806

RIN 1505-AA72

Community Development Financial Institutions Program; Bank 
Enterprise Award Program; Correction

AGENCY: Community Development Financial Institutions Fund, Department 
of the Treasury.

ACTION: Correction to interim rule.

-----------------------------------------------------------------------

SUMMARY: This document contains corrections to the interim regulations 
that were published Tuesday, January 23, 1996 (61 FR 1699). The 
regulations relate to the Community Development Financial Institutions 
Program and the Bank Enterprise Award Program.

EFFECTIVE DATE: January 23, 1996.

FOR FURTHER INFORMATION CONTACT:
Kirsten S. Moy, Director, Community Development Financial Institutions 
Fund at (202) 343-0620. (This is not a toll free number.)

SUPPLEMENTARY INFORMATION: The interim regulations that are the subject 
of these corrections revised the interim regulations for the Community 
Development Financial Institutions Program and the Bank Enterprise 
Program that were published in the Federal Register on October 19, 1995 
(60 FR 54110). As published, the amendatory instructions contained 
errors which may prove to be misleading and are in need of 
clarification.
    Accordingly, the publication on January 23, 1996 of the interim 
regulations, which were the subject of FR Doc. 96-745, is corrected as 
follows:
    1. On page 1701, in the first column, amendatory instruction number 
4, in the first line, the citation ``1806.600'' is corrected to read 
``1805.600''.

Sec. 1806.202  [Corrected]

    2. On page 1702, in the second column, amendatory instruction 
number 5, in the third line, the citation ``(d)(2)'' is corrected to 
read ``(b)(2)'', and in the fourth line the citation ``(d)(3)'' is 
corrected to read ``(b)(3)''.
    3. On page 1702, in the third column, amendatory instruction number 
7 is correctly designated as amendatory instruction number 6.

    Dated: February 23, 1996.
Kirsten S. Moy,
Director, Community Development Financial Institutions Fund.
[FR Doc. 96-4666 Filed 2-28-96; 8:45 am]
BILLING CODE 4810-70-M

Complete official Federal Register PDF

FR Doc. 96-4651 Designation of Agencies To Receive and Investigate Reports Required Under the Victims of Child Abuse Act
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7704-7706]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4651]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF JUSTICE

Office of the Attorney General

28 CFR Part 81

[AG Order No. 2009-96]
RIN 1105-AA38

Designation of Agencies To Receive and Investigate Reports 
Required Under the Victims of Child Abuse Act

AGENCY: Department of Justice.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule carries out the Attorney General's responsibilities 
under the child abuse reporting provisions of the Victims of Child 
Abuse Act of 1990 (``VCAA''). The VCAA requires persons engaged in 
certain specified professions and activities on federal lands or 
facilities to report incidents of child abuse to the appropriate 
federal, state, or local agency designated by the Attorney General. In 
order to facilitate effective reporting, the VCAA requires the Attorney 
General to ``designate an agency'' to receive and investigate such 
reports of child abuse. This rule sets forth the Attorney General's 
designations and certain other matters covered by the VCAA's reporting 
requirements.

EFFECTIVE DATE: This rule is effective April 1, 1996.

[[Page 7705]]

FOR FURTHER INFORMATION CONTACT:
Terry R. Lord, Acting Chief, Child Exploitation and Obscenity Section, 
Criminal Division, Washington, D.C. 20530, (202) 514-5780.

SUPPLEMENTARY INFORMATION: 
I. Background
    The child abuse reporting provisions of the Victims of Child Abuse 
Act (VCAA) were enacted as section 226 of the Crime Control Act of 
1990, Pub. L. No. 101-647, 104 Stat. 4806, codified at 42 U.S.C. 13001-
13041, 3796aa-3796aa-8, and 18 U.S.C. 403, 2257, and 3509. As set forth 
at 42 U.S.C. 13031, the VCAA requires persons engaged in certain 
professional capacities or activities on federal lands or on federally 
operated facilities (as well as certain facilities covered by federal 
contracts) (``covered professional'') to report incidents of child 
abuse to an agency designated by the Attorney General to receive and 
investigate such reports. On January 3, 1994, the Department of Justice 
published a proposed rule promulgating the Attorney General's 
designation of the agencies to receive and investigate these reports of 
child abuse (59 FR 37). Having received and considered comments 
submitted in response to the proposed rule, the Attorney General is now 
promulgating a final rule on this subject.
    Under the provisions of 42 U.S.C. 13031(d), the Attorney General 
may designate non-federal agencies to receive and investigate the child 
abuse reports, provided that the designation is formalized by a written 
agreement. Under the rule, reports of child abuse made pursuant to 42 
U.S.C. 13031 are to be submitted to the federal, state, tribal or local 
law enforcement or child protective services agency that currently has 
jurisdiction to investigate reports of child abuse or protect child 
abuse victims in the federal land area or facility in question. Where 
no agency currently qualifies for designation under the rule, the rule 
designates the Federal Bureau of Investigation (``FBI'') to receive and 
investigate the reports of child abuse until another agency qualifies 
for such designation. If the child abuse reported by the covered 
professional pursuant to 42 U.S.C. 13031 occurred outside the federal 
area or facility in question, the designated agency receiving the 
report must forward the matter to the appropriate authority with 
jurisdiction over the potential offense. For example, a covered 
reporting professional may, while working on federal land or in a 
federally operated facility, learn of facts that give reason to suspect 
that a child has suffered abuse outside the federal area in question. 
In such a circumstance, the covered professional would report the abuse 
in the same manner as if the abuse occurred within the federal area in 
question. The rule contemplates that the designated agency receiving 
the report will immediately forward the matter to the appropriate 
authority with jurisdiction outside the federal area in question.
    In accordance with 5 U.S.C. 605(b), the Attorney General certifies 
that this rule will not have a significant adverse economic impact on a 
substantial number of small entities. This rule has not been reviewed 
by the Office of Management and Budget pursuant to Executive Order 
12866. This rule does not have federalism implications warranting the 
preparation of a Federalism Assessment in accordance with Executive 
Order 12612. This rule meets the applicable standards provided in 
sections 2(a) and 2(b) of Executive Order 12778. Notice of the proposed 
rule was published in the Federal Register on January 3, 1994, and 
comments were solicited (59 FR 37). A discussion of comments received 
pursuant to that notice follows.

II. Summary of Comments and Department's Responses

    Comments on the proposed rule were received from a number of 
affected federal and state agencies. Set forth below is a summary of 
those comments and the Department's response to them.
Comments from the New Jersey Division of Youth and Family Services:
    1. A distinction should be made between child abuse offenses 
committed against children by caregivers and child assault offenses 
committed by other adults.
    Response: Such a distinction is not contemplated or authorized by 
the underlying statutory requirement, 42 U.S.C. 13031. The statutory 
reporting requirement is not qualified by any distinction concerning 
the status of persons committing the abuse in question.
    2. The list of ``covered professionals'' mandated to report child 
abuse or neglect should be expanded to include additional employees on 
federal land.
    Response: This list cannot be expanded because to do so would 
exceed the scope permitted by the enabling statute. See 42 U.S.C. 
13031(b). The statute specifically designates the mandated reporters by 
their profession or activity.
    3. The proposed rule does not address the reporting of child abuse 
occurring off federal land or facilities, but which becomes known to 
mandated reporters employed at those locations.
    Response: The rule has been clarified to mandate that covered 
professionals report any incident of suspected child abuse as defined 
in the statute, regardless of where the abuse occurred. If the incident 
of suspected child abuse occurred outside the federal area or facility 
in question, the designated agency receiving the report must forward 
the matter to the appropriate authority with jurisdiction.
Comments from Family Advocacy Program, The Office of the Assistant 
Secretary of Defense:
    1. Federal ``covered professionals'' must be required to report 
incidents of abuse or neglect regardless of where the alleged abuse 
occurred.
    Response: As indicated in response to comment 3 from the New Jersey 
Division of Youth and Family Services, the rule has been clarified as 
requested.
    2. Amend Section 81.2 of the proposed rule so that the federal 
agencies or administrators on federal lands or federally operated or 
contracted facilities have ``primary responsibility'' for entering into 
a Memorandum of Understanding or other form of formal written agreement 
for the reporting of suspected cases of child abuse.
    Response: The rule contemplates that the United States will take 
the lead in initiating the written agreements where needed.
    3. Include a requirement that the FBI ``closely coordinate'' 
efforts with the local law enforcement or child protective services 
because the federal authorities do not have the authority to remove a 
child from the home to prevent further abuse.
    Response: It is contemplated that the FBI will closely coordinate 
with local law enforcement and child protective services since federal 
authorities usually have no jurisdiction to remove a child from the 
home to prevent further abuse.
Comments from the Diplomatic Security Service, the United States 
Department of State:
    1. Indicate that reports of child abuse arising at the United 
States diplomatic and consular posts abroad should be made to the 
appropriate Special Agent or Regional Security Officer of the 
Department of State's Diplomatic Security Service.
    Response: The requested amendment is not necessary because, under 
the current language of the proposed rule, the Diplomatic Security 
Service would constitute the ``designated agency'' to receive and 
investigate reports of child abuse under the circumstances described. 
Section 81.2 stipulates that ``[r]eports of child abuse required by 42

[[Page 7706]]

U.S.C. 13031 shall be made to the local law enforcement agency or local 
child protective services agency that has jurisdiction to investigate 
reports of child abuse or to protect child abuse victims in the land 
area or facility in question.'' The Diplomatic Security Service would 
therefore be the ``designated agency'' in the circumstances described 
in this comment, inasmuch as Section 81.5 defines local law enforcement 
agency to include ``the Federal * * * law enforcement agency that has 
the primary responsibility for the investigation of an instance of 
alleged child abuse* * *''
Comments from the Office of Enforcement and Security Management, United 
States Department of Interior:
    1. Eliminate from the last sentence of section 81.2 the following: 
``* * * or a Federal agency with jurisdiction for the area or facility 
in question,'' and omit the requirement for a formal written agreement 
with local law enforcement entities.
    Response: The provisions of the enabling statute, 42 U.S.C. 13031, 
preclude adoption of the suggested amendment. We understand that the 
underlying concern behind the Department of Interior request is 
apprehension that an administratively crippling number of agreements 
would be needed in Bureau of Land Management (``BLM'') areas. However, 
the Department does not interpret the term ``federal lands'' as used in 
42 U.S.C. 13031 to include those lands held by the United States merely 
as a proprietor as distinguished form those lands over which the United 
States is empowered to exercise legislative jurisdiction. See generally 
Adams v. United States, 319 U.S. 312 (1943); James v. Dravo Contracting 
Co., 302 U.S. 134, 139 (1937). It is our understanding that most land 
managed by BLM falls within the former category. Congress could not 
reasonably have intended to include such lands within the term 
``federal lands'' as used in the Victims of Child Abuse statute. 
Therefore, the mandates of the rule and enabling legislation do not 
apply to such merely proprietary lands managed by BLM.

List of Subjects in 28 CFR Part 81

    Child abuse, Federal buildings and facilities.

    For the reasons set forth in the preamble, and by virtue of the 
authority vested in me as Attorney General, including 28 U.S.C. 509 and 
510, 5 U.S.C. 301, and 42 U.S.C. 13031, and Public Law 101-647 (104 
Stat. 4806), part 81 of chapter I of title 28 of the Code of Federal 
Regulations is added as follows:

PART 81--CHILD ABUSE REPORTING DESIGNATIONS AND PROCEDURES

Sec.
81.1  Purpose.
81.2  Submission of reports; designation of agencies to receive 
reports of child abuse.
81.3  Designation of Federal Bureau of Investigation.
81.4  Referral of reports where designated agency is not a law 
enforcement agency.
81.5  Definitions.

    Authority: 28 U.S.C. 509, 510; 42 U.S.C. 13031.

Sec. 81.1  Purpose.

    The regulations in this part designate the agencies that are 
authorized to receive and investigate reports of child abuse under the 
provisions of section 226 of the Victims of Child Abuse Act of 1990, 
Public Law 101-647, 104 Stat. 4806, codified at 42 U.S.C. 13031.

Sec. 81.2  Submission of reports; designation of agencies to receive 
reports of child abuse.

    Reports of child abuse required by 42 U.S.C. 13031 shall be made to 
the local law enforcement agency or local child protective services 
agency that has jurisdiction to investigate reports of child abuse or 
to protect child abuse victims in the land area or facility in 
question. Such agencies are hereby respectively designated as the 
agencies to receive and investigate such reports, pursuant to 42 U.S.C. 
13031(d), with respect to federal lands and federally operated or 
contracted facilities within their respective jurisdictions, provided 
that such agencies, if non-federal, enter into formal written 
agreements to do so with the Attorney General, her delegate, or a 
federal agency with jurisdiction for the area or facility in question. 
If the child abuse reported by the covered professional pursuant to 42 
U.S.C. 13031 occurred outside the federal area or facility in question, 
the designated local law enforcement agency or local child protective 
services agency receiving the report shall immediately forward the 
matter to the appropriate authority with jurisdiction outside the 
federal area in question.

Sec. 81.3  Designation of Federal Bureau of Investigation.

    For federal lands, federally operated facilities, or federally 
contracted facilities where no agency qualifies for designation under 
Sec. 81.2, the Federal Bureau of Investigation is hereby designated as 
the agency to receive and investigate reports of child abuse made 
pursuant to 42 U.S.C. 13031 until such time as another agency qualifies 
as a designated agency under Sec. 81.2.

Sec. 81.4  Referral of reports where the designated agency is not a law 
enforcement agency.

    Where a report of child abuse received by a designated agency that 
is not a law enforcement agency involves allegations of sexual abuse, 
serious physical injury, or life-threatening neglect of a child, that 
agency shall immediately report such occurrence to a law enforcement 
agency with authority to take emergency action to protect the child.

Sec. 81.5  Definitions.

    Local child protective services agency means that agency of the 
federal government, of a state, of a tribe or of a local government 
that has the primary responsibility for child protection within a 
particular portion of the federal lands, a particular federally 
operated facility, or a particular federally contracted facility in 
which children are cared for or reside.
    Local law enforcement agency means that federal, state, tribal or 
local law enforcement agency that has the primary responsibility for 
the investigation of an instance of alleged child abuse occurring 
within a particular portion of the federal lands, a particular 
federally operated facility, or a particular federally contracted 
facility in which children are cared for or reside.

    Dated: February 18, 1996.
Janet Reno,
Attorney General.
[FR Doc. 96-4651 Filed 2-28-96; 8:45 am]
BILLING CODE 4410-01-M

Complete official Federal Register PDF

FR Doc. 96-4632 Toll Free Service Access Codes
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7737-7739]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4632]

=======================================================================
-----------------------------------------------------------------------

[[Page 7738]]

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 61

[CC Docket No. 95-155; DA 96-69]

Toll Free Service Access Codes

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Report and Order resolves certain issues essential to the 
industry opening the 888 toll free service access code (``SAC'') on 
March 1, 1996. The Report and Order adopted by the Common Carrier 
Bureau of the FCC, identifies which numbers in the 888 Service Access 
Code (``SAC'') will become generally available for reservation on 
February 10, 1996 and establishes limits on how many 888 and 800 
numbers each Responsible Organization (``RespOrg'') may reserve so as 
to not overload the system and interrupt the reservation process. For 
tariffing purposes, the Report and Order concludes that toll free 
service using the 888 SAC is functionally equivalent to toll free 
service that uses the 800 SAC. The introduction of the 888 SAC for toll 
free calling is determined to be an expansion of the universe of toll 
free numbers brought on by an increase in the demand for toll free 
services and is considered to be similar to an increase in network 
capacity. Local exchange carriers (``LECs'') are, therefore, not 
allowed to treat the costs and investments associated with the 
introduction of the 888 SAC exogenously under price caps.

EFFECTIVE DATE: January 25, 1996.

FOR FURTHER INFORMATION CONTACT: Irene Flannery, (202) 418-2373; Mary 
DeLuca (202) 418-2344; Bradley S. Wimmer (202) 418-2351 Network 
Services Division, Common Bureau.

SUPPLEMENTARY INFORMATION: This document summarizes the Bureau's Report 
and Order In the Matter of Toll Free Service Access Codes (CC Docket 
95-155, adopted January 24, 1996, and released January 25, 1996, DA 96-
69). The file is available for inspection and copying during the 
weekday hours of 9:00 a.m. to 4:30 p.m. in the Commission's Reference 
Center, room 239, 1919 M Street, N.W., Washington, D.C., or copies may 
be purchased from the Commission's duplicating contractor, ITS, Inc., 
2100 M Street, N.W., Suite 140, Washington, D.C. 20037, phone (202) 
857-3800.

Paperwork Reduction Act

    The Report and Order contains no requests for data and, therefore, 
does not require review by the Office of Management and Budget under 
the Paperwork Reduction Act of 1995.

Analysis of Proceeding

Background

    In October 1995, the Commission initiated a rulemaking proceeding 
to ensure that in the future, toll free numbers are allocated on a 
fair, equitable and orderly basis. Generally, the Notice sought comment 
on proposals to: (1) promote the efficient use of toll free numbers; 
(2) foster the fair and equitable reservation and distribution of toll 
free numbers; (3) smooth the transition period preceding introduction 
of a new toll free code; (4) guard against warehousing of toll free 
numbers; and (5) determine how toll free vanity numbers should be 
treated. (CC Docket No. 95-155, FCC 95-419, 60 FR 53157, October 12, 
1995) That Notice was issued in response to industry reports that the 
existing pool of toll free numbers were being consumed at a rate that 
would exhaust the supply of toll free numbers in the 800 Service Access 
Code (``SAC'') before the 888 SAC would be deployed. On January 24, 
1996, the Commission released an Order (CC Docket No. 95-155, adopted 
January 23, 1996, FCC 96-18) that delegated to the Chief of the Common 
Carrier Bureau (``Bureau'') the authority to resolve the issues 
essential to the industry opening the 888 toll free service access code 
(``SAC'') on schedule. Toll free service using the 888 SAC is currently 
scheduled to begin on March 1, 1996.

Summary

    1. The Report and Order resolves those issues essential to opening 
the 888 SAC for toll free calling according to schedule. Specifically, 
the Report and Order defers the issue of what permanent protection, if 
any, those subscribers with a commercial interest in preventing their 
800 number from being replicated in the 888 code will be afforded to 
the Commission; concludes that RespOrgs should determine which toll 
free subscribers using the 800 SAC will have their 800 numbers 
protected from replication in the 888 code during the initial 
reservation of 888 numbers; sets the date for which initial reservation 
of 888 numbers will begin; sets limitations on the number of numbers 
that RespOrgs will be allowed to reserve for both 800 and 888 numbers; 
and concludes that the costs incurred by LECs regulated under price 
caps to upgrade the 800 database will not be treated as exogenous.
    2. In this Order, the Bureau agrees with the SMS/800 Number 
Administration Committee (``SNAC'') that RespOrgs should poll their 800 
subscribers to determine which numbers subscribers may want replicated 
in 888. We expect that RespOrgs will continue this polling process 
until February 1, 1996. We direct Database Management Services, Inc. 
(``DSMI'') to set aside those 888 numbers identified by the RespOrgs by 
placing these ``vanity numbers'' in ``unavailable'' status until we 
resolve whether these numbers should be afforded any special right or 
protection on a permanent basis. We also conclude that the entire 
``888-555'' NXX should be designated as ``unavailable'' until the 
Commission resolves those issues that will permit competitive toll free 
directory assistance services.
    3. The Bureau concludes that first come, first served remains the 
most equitable, easily administered, and least expensive means of 
allocating toll free numbers. The Order sets February 10, 1996 as the 
date for which reservation of 888 toll free numbers will begin. The 888 
numbers will be rationed based on a version of the 800 number 
conservation plan initiated to delay the complete exhaust of toll free 
numbers in the 800 SAC until after the 888 SAC is in use for toll free 
calling. The Bureau implements a conservation plan in order to avoid a 
system overload that would temporarily interrupt the reservation 
process. According to the Bureau's conservation plan, up to 120,000 888 
numbers per week may be reserved. The Bureau does not, however, at this 
time discontinue the conservation of 800 numbers but, instead, 
increases the size of the allocation from 29,000 numbers a week to 
73,000 numbers a week for a three week period and then returns to the 
29,000 numbers a week allocation plan.
    4. For tariffing purposes, the Bureau concludes that toll free 
service using the 888 SAC is functionally equivalent to toll free 
service that uses the 800 code. Moreover, the Bureau concludes that the 
addition of 888 numbers to the universe of toll free numbers is 
comparable to an increase in network capacity and, therefore, will not 
allow the costs attributable to the implementation of 888 to be treated 
as exogenous by carriers regulated under price caps.

Ordering Clauses

    Accordingly, IT IS ORDERED that, pursuant to authority contained in 
Sections 1, 4, 5, and 201-205 of the Communications Act of 1934, as 
amended, 47 U.S.C. Secs. 151, 154, 155, and 201-205, Section 0.201(d) 
of the Commission's rules, 47 C.F.R. 

[[Page 7739]]
Sec. 0.201(d), this Report and Order is hereby ADOPTED.
    IT IS FURTHER ORDERED that, pursuant to 5 U.S.C. Sec. 554(d) and 47 
C.F.R. Sec. 1.103(a), this Report and Order shall take effect upon 
adoption.

List of Subjects in 47 CFR Part 61

    Communication common carriers.

Federal Communications Commission.
John S. Morabito,
Deputy Chief, Network Services Division, Common Carrier Bureau.
[FR Doc. 96-4632 Filed 2-28-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-4631 Radio Broadcasting Services; Copeland, KS
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Page 7739]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4631]

-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION
47 CFR Part 73

[MM Docket No. 95-85; RM-8518]

Radio Broadcasting Services; Copeland, KS

AGENCY: Federal Communications Commission.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This document contains a correction to the final regulation 
document which was published Friday, January 26, 1996 (61 FR 02453).

EFFECTIVE DATE: February 29, 1996.

FOR FURTHER INFORMATION CONTACT: Barbara Chappelle, Publications 
Branch, (202) 418-0310.

SUPPLEMENTARY INFORMATION:

Need of Correction

    As published, the final regulation document contains an error in 
the window period and closing date.

Correction of Publication

    Accordingly, the publication on January 26, 1996 of the final 
regulations, which were subject of FR Doc. 96-1420 is Corrected as 
follows:
    On page 02453, in the second column, In the DATES section, the 
window period closing date for filing applications should be April 4, 
1996 in lieu of March 19, 1996.

Federal Communications Commission.
William F. Caton,
Acting Secretary.
[FR Doc. 96-4631 Filed 2-28-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-4630 Radio Broadcasting Services; Grand Junction, CO
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Page 7739]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4630]

-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION
47 CFR Part 73

[MM Docket No. 95-43; RM-8580]

Radio Broadcasting Services; Grand Junction, CO

AGENCY: Federal Communications Commission.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This document contains a correction to the final regulation 
document which was published Friday, January 26, 1996 (61 FR 02453).

EFFECTIVE DATE: February 29, 1996.

FOR FURTHER INFORMATION CONTACT: Barbara Chappelle, Publications 
Branch, (202) 418-0310.

SUPPLEMENTARY INFORMATION:

Need of Correction

    As published, the final regulation document contains an error in 
the window period and closing date.

Correction of Publication

    Accordingly, the publication on January 26, 1996 of the final 
regulations, which were the subject of FR Doc. 96-1422 is corrected as 
follows:
    On page 02453, in the third column, in the DATES section, the 
window period closing date for filing applications should be April 4, 
1996 in lieu of March 19, 1996.

Federal Communications Commission.
William F. Caton,
Acting Secretary.
[FR Doc. 96-4630 Filed 2-28-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-4629 Direct Food Substances Affirmed as Generally Recognized as Safe; Lactase Enzyme Preparation From Candida Pseudotropicalis
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7702-7704]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4629]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration

21 CFR Part 184

[Docket No. 83G-0062]

Direct Food Substances Affirmed as Generally Recognized as Safe; 
Lactase Enzyme Preparation From Candida Pseudotropicalis

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is amending its 
regulations to affirm that lactase enzyme preparation derived from 
Candida pseudotropicalis for use in milk and milk-derived products to 
hydrolyze lactose is generally recognized as safe (GRAS). This action 
is in response to a petition submitted by Pfizer, Inc.

DATES: Effective February 29, 1996. The Director of the Office of the 
Federal Register approves the incorporation by reference in accordance 
with 5 U.S.C. 552(a) and 1 CFR part 51 of certain publications listed 
in new Sec. 184.1387, effective February 29, 1996.

FOR FURTHER INFORMATION CONTACT: Nega Beru, Center for Food Safety and 
Applied Nutrition (HFS-206), Food and Drug Administration, 200 C St. 
SW., Washington, DC 20204, 202-418-3097.

SUPPLEMENTARY INFORMATION:

I. Background

    In accordance with the procedures described in Sec. 170.35 (21 CFR 
170.35), Pfizer, Inc., 235 East 42d St., New York, NY 10017, submitted 
a petition (GRASP 2G0282) proposing that lactase enzyme preparation 
from C. pseudotropicalis be affirmed as GRAS for use as a direct human 
food ingredient. (Lactase, the enzyme, is to be distinguished from 
lactase enzyme preparation, which contains lactase as the principal 
active component but also contains other components derived from the 
production organism and fermentation media. This document will refer to 
the former as ``lactase'' and to the latter as ``lactase enzyme 
preparation.'') Lactase enzyme preparation is used to hydrolyze lactose 
in milk and milk products.
    FDA published a notice of filing of this petition in the Federal 
Register of March 29, 1983 (48 FR 13098), and gave interested persons 
an opportunity to submit comments to the Dockets Management Branch 
(HFA-305), Food and Drug Administration, 12420 Parklawn Dr., rm. 1-23, 
Rockville, MD 20857. FDA received no comments in response to that 
notice.

II. Standards for GRAS Affirmation

    Under Sec. 170.30 (21 CFR 170.30), general recognition of safety 
may be based only on the views of experts qualified by scientific 
training and experience to evaluate the safety of substances added to 
food. The basis of such views may be either: (1) Scientific procedures, 
or (2) in the case of a substance used in food prior to January 1, 
1958, experience based on common use in food (Sec. 170.30(a)). General 
recognition of safety based upon scientific procedures requires the 
same quantity and quality of scientific evidence as is required to 
obtain approval of a food additive and ordinarily is to be based upon 
published studies, which may be corroborated by unpublished studies and 
other data and information (Sec. 170.30(b)). General recognition of 
safety through experience based on common use in food prior to January 
1, 1958, may be determined without the quantity or quality of 
scientific procedures required for approval of a food additive, and 
ordinarily is to be based upon generally available data and information 
concerning the pre-1958 history of use of the food ingredient 
(Sec. 170.30(c)).
    The petition states that C. pseudotropicalis was isolated from 
dairy products prior to 1958 (Refs. 1 and 2). Therefore, the petition 
argues, lactase produced by the organism has been part of the human 
diet for many years and may be presumed to have been in common use in 
food prior to January 1, 1958. The petition also states that Pfizer, 
Inc., first began commercial production of lactase enzyme preparation 
derived from C. pseudotropicalis in 1982 for use in certain dairy 
products.
    The agency recognizes that C. pseudotropicalis was isolated from 
dairy products prior to 1958. However, lactase enzyme preparation 
derived from C. pseudotropicalis does not itself have a history of 
common use as an ingredient in food before 1958. Therefore, the enzyme 
preparation does not qualify for GRAS status based on a history of 
common use in food (Sec. 170.30(c)). Accordingly, FDA has evaluated the 
enzyme preparation on the basis of scientific procedures under 
Sec. 170.30(b).
    In evaluating this petition, the agency reviewed information 
concerning: (1) The identity and function of the enzyme, (2) the 
production and purification of the lactase enzyme preparation, and (3) 
the safety of the production organism and the finished lactase enzyme 
preparation.

III. Identity and Technical Effect

    Lactase is the accepted name for the enzyme -D-galactoside 
galactohydrolase (EC 3.2.1.23), which catalyzes the hydrolysis of the 
disaccharide lactose to its component monosaccharides, glucose and 
galactose. Lactase enzyme preparations may be produced by fermentation 
utilizing any of a large number of microorganisms. A typical example is 
the enzyme produced by the yeast Kluyveromyces lactis (Ref. 3).
    The lactase preparation that is the subject of this petition is a 
soluble enzyme preparation derived from the yeast C. pseudotropicalis 
and is composed of the enzyme lactase as the principal active 
ingredient, other components derived from the production organism and 
the fermentation media, residual amounts of processing aids, and 
substances added as stabilizers or diluents. The petitioned enzyme 
preparation meets the general and additional requirements for enzyme 
preparations found in the Food Chemicals Codex, 3d ed. (1981), which 
are incorporated by reference in Sec. 184.1387 (Ref. 4).
    Lactase enzyme preparation is intended for use in hydrolyzing 
lactose to reduce the lactose content of food products. The petitioner 
provided published information to demonstrate that lactase enzyme 
preparation from C. pseudotropicalis hydrolyzes lactose in milk and 
milk products.

[[Page 7703]]

IV. Production and Purification of Lactase Enzyme Preparation

    The lactase enzyme preparation that is the subject of this petition 
is produced by controlled aerobic fermentation using a pure culture of 
the food-derived yeast C. pseudotropicalis, aseptically grown in a 
medium containing suitable food-grade carbohydrates, proteins, mineral 
salts, and processing aids. The isolated cells are mixed with a warm 
buffer solution consisting of potassium phosphate (mono- and dibasic) 
and manganous sulfate and allowed to autolyze for up to 24 hours. The 
resulting material is clarified to remove cell debris and other 
insoluble solids, and the lactase-containing yeast extract is 
concentrated by processes appropriate for food use, including 
ultrafiltration. Glycerol and/or sorbitol may be added as stabilizers, 
and suitable preservatives may be incorporated during processing. The 
stabilized lactase preparation is adjusted to a standard potency using 
a combination of water mixed with glycerol or sorbitol.

V. Safety Information-

    In its petition, Pfizer, Inc., provided published information to 
document that the organism C. pseudotropicalis was isolated from dairy 
products as early as 1952 (Refs. 1 and 2). Pfizer, Inc., argues that 
since the organism is a copious producer of lactase (Ref. 5), both the 
organism and the lactase it produces have been ingested by man for many 
years. In addition, Pfizer, Inc., points out that C. pseudotropicalis 
resembles K. fragilis (a yeast, also known as Saccharomyces fragilis, 
that is approved as a direct food additive ((Sec. 172.896) (21 CFR 
172.896))) in all respects except that C. pseudotropicalis is unable to 
reproduce sexually (Refs. 1 and 6). K. fragilis, like C. 
pseudotropicalis, has been isolated from dairy products (Refs. 1 and 
7); in fact, the organisms are often found together in dairy foods 
(Ref. 5).
    Pfizer, Inc., presented published reports to establish the 
similarity between C. pseudotropicalis and K. fragilis. For example, in 
an electrophoretic comparison of enzymes, a method used to clarify the 
taxonomical and physiological relationships among strains, the 
enzymatic patterns of C. pseudotropicalis and its perfect state, K. 
fragilis, were shown to coincide (Ref. 8). Further, a study using a 
deoxyribonucleic acid (DNA) reassociation technique showed that, within 
the accuracy permitted by the technique, C. pseudotropicalis and K. 
fragilis have identical DNA sequences (Ref. 9).
    The close similarity between the source microorganism (C. 
pseudotropicalis) and K. fragilis, which FDA has determined is safe for 
use as a direct food additive (Sec. 172.896), supports the safety of 
the enzyme preparation (Refs. 10 and 11). Further, the information 
submitted by the petitioner establishes that lactase produced by both 
yeasts has been ingested by humans for many years with no reported 
adverse effects (Ref. 12).
    To further document the safety of C. pseudotropicalis, Pfizer, 
Inc., presented a published study which compared the pathogenic 
potential of several industrial yeasts with that of established 
pathogens. The study found that neither C. pseudotropicalis nor K. 
fragilis produced signs of tissue invasion or disease. The authors of 
the study categorized both organisms in a group of nonpathogenic 
organisms (Ref. 13). Finally, Pfizer, Inc., submitted unpublished 
corroborative studies conducted in mice to confirm the nonpathogenicity 
of C. pseudotropicalis.
    After conducting a review of the literature and evaluating these 
studies, the agency concludes that C. pseudotropicalis is neither 
pathogenic nor toxicogenic (Refs. 14 and 15). Furthermore, the agency 
has determined that the autolysis and filtration steps used in 
producing and purifying the lactase enzyme preparation effectively 
remove viable cells of the production organism (Ref. 15).
    Pfizer, Inc., also presented corroborative unpublished toxicity 
studies to establish the safety of lactase enzyme preparation derived 
from C. pseudotropicalis. These were: (1) An acute oral toxicity study 
in rats, (2) mutagenic and cytogenetic assays, and (3) 90-day oral 
toxicity studies in rats and dogs. The agency has evaluated the studies 
and concludes that the studies showed no evidence of toxicity or 
genotoxicity (Ref. 16).
    Finally, Pfizer, Inc., presented information regarding use levels 
of the enzyme preparation in milk and milk products. Based on this 
information, the agency concludes that the use of lactase enzyme 
preparation from C. pseudotropicalis would not add to the total 
consumption of lactase from all sources because the petitioned enzyme 
preparation will be substituted for other lactase enzyme preparations 
currently in use (Ref. 17).

VI. Conclusions-

    The agency has evaluated the information in the petition, along 
with other available information, and concludes that lactase enzyme 
preparation derived from C. pseudotropicalis is GRAS. This conclusion 
is based on published information, corroborated by unpublished data and 
information.
    Therefore, the agency is affirming that lactase enzyme preparation 
derived from C. pseudotropicalis is GRAS with no limits on its 
conditions of use other than current good manufacturing practice, in 
accordance with 21 CFR 184.1(b)(1). This GRAS affirmation is based on 
evaluation of the use of the enzyme preparation to reduce the lactose 
content of milk and milk-derived food products.
    The agency further finds that because the principal active 
ingredient of the enzyme preparation is safe and because expected 
impurities in the enzyme preparation do not provide any basis for a 
safety concern, the general requirements and additional requirements 
for enzyme preparations given in the Food Chemicals Codex, 3d ed. 
(1981), pp. 107-110, are adequate as minimum criteria for food-grade 
lactase enzyme preparations derived from C. pseudotropicalis.

VII. Environmental Impact

    The agency has determined under 21 CFR 25.24(b)(7) that this action 
is of a type that does not individually or cumulatively have a 
significant effect on the human environment. Therefore, neither an 
environmental assessment nor an environmental impact statement is 
required.

VIII. Analysis of Impacts

    FDA has examined the impact of this final rule under Executive 
Order 12866 and the Regulatory Flexibility Act (Pub. L. 96-354). 
Executive Order 12866 directs agencies to assess all costs and benefits 
of available regulatory alternatives and, when regulation is necessary, 
to select regulatory approaches that maximize net benefits (including 
potential economic, environmental, public health and safety effects; 
distributive impacts; and equity). According to Executive Order 12866, 
a regulatory action is significant if it meets any one of a number of 
conditions, including having an annual effect on the economy of $100 
million; adversely affecting in a material way a sector of the economy, 
competition, or jobs; or raising novel legal or policy issues. The 
Regulatory Flexibility Act requires analyzing options for regulatory 
relief for small businesses.
    FDA finds that this final rule is not a significant regulatory 
action as defined by Executive Order 12866. The final rule does not 
raise novel legal or policy 

[[Page 7704]]
issues. The compliance cost to firms currently in the industry is zero 
because the rule prohibits no current activity. Potential benefits 
include the wider use of the enzyme preparation because of reduced 
uncertainty concerning its regulatory status, and any resources saved 
by eliminating the need to prepare further petitions to affirm the GRAS 
status of this use of the enzyme preparation.
    Finally, in compliance with the Regulatory Flexibility Act, FDA 
certifies that the final rule will not have a significant impact on a 
substantial number of small businesses. The compliance cost to small 
businesses currently in the industry is zero because no current 
activity is prohibited under the rule.

IX. Effective Date-

    As this rule recognizes an exemption from the food additive 
definition in the Federal Food, Drug, and Cosmetic Act, and from the 
approval requirements applicable to food additives, no delay in 
effective date is required by the Administrative Procedure Act (5 U.S.C 
553(d)). The rule will therefore be effective immediately (5 U.S.C. 
553(d)(1)).

X. References

    The following references have been placed on display in the Dockets 
Management Branch (address above) and may be seen by interested persons 
between 9 a.m. and 4 p.m., Monday through Friday.
    1. Lodder, J., The Yeasts: A Taxonomic Study, 2d ed., pp. 345-
348, 1025-1027, North Holland Publishing Co., Amsterdam, 1970.
    2. Rose, A. H., and J. S. Harrison, The Yeasts, V 1, Biology of 
Yeasts, p. 139, Academic Press, New York, 1969.
    3. 21 CFR 184.1388.
    4. ``Monograph on Enzyme Preparations,'' in Food Chemicals 
Codex, 3d ed., National Academy Press, Washington, DC, pp. 107-110, 
1981.
    5. Schmidt, J. L., and J. Lenoir, ``Contribution to the Study of 
Yeast Flora in Camembert Cheese. Its Development During Ripening,'' 
Lait 58 (577):355-370, 1978.
    6. Kreger van Rij, N. J. W., ``The Yeasts: A Taxonomic Study,'' 
pp. 233-234, North Holland Pub. Co., Amsterdam, 1970.
    7. Lutwick, L. I., H. J. Phaff, and D. A. Stevens, 
``Kluyveromyces fragilis as an Opportunistic Fungal Pathogen in 
Man,'' Sabouraudia 18:69-73, 1980.
    8. Yamazaki, M., and K. Komagata, ``Asporogenous Yeasts and 
Their Supposed Ascosporogenous States: An Electrophoretic Comparison 
of Enzymes,'' Journal of General and Applied Microbiology, 28:119-
138, 1982.
    9. Letter from H. J. Phaff, University of California, Davis, to 
W. C. Wernau, Pfizer, Inc., February 13, 1980.
    10. Memorandum from T. J. McKay, FDA, to M. Custer, FDA, 
November 8, 1982.
    11. Memorandum from C. B. Johnson, FDA, to N. Beru, FDA, 
February 2, 1994.
    12. Memorandum from C. B. Johnson, FDA, to the Direct Additives 
Branch, FDA, December 6, 1988.
    13. Holzschu, D. L. et al., ``Evaluation of industrial yeast for 
pathogenicity,'' Sabouraudia 17:71-78, 1979.
    14. Memorandum from P. Mislivec, FDA, to M. Custer, FDA, October 
22, 1982.
    15. Memorandum from J. M. Madden, FDA, to M. Peiperl, FDA, 
November 5, 1993.
    16. Memorandum from A. N. Milbert, FDA, to V. Prunier, FDA, 
August 13, 1984.
    17. Memorandum from J. Modderman, FDA, to V. Prunier, FDA, 
November 7, 1984.

List of Subjects in 21 CFR Part 184

    Food ingredients, Incorporation by reference.
    Therefore, under the Federal Food, Drug, and Cosmetic Act and under 
authority delegated to the Commissioner of Food and Drugs and 
redelegated to the Director, Center for Food Safety and Applied 
Nutrition, 21 CFR part 184 is amended as follows:

PART 184--DIRECT FOOD SUBSTANCES AFFIRMED AS GENERALLY RECOGNIZED 
AS SAFE

    1. The authority citation for 21 CFR part 184 continues to read as 
follows:

    Authority: Secs. 201, 402, 409, 701 of the Federal Food, Drug, 
and Cosmetic Act (21 U.S.C. 321, 342, 348, 371).

    2. New Sec. 184.1387 is added to subpart B to read as follows:

Sec. 184.1387  Lactase enzyme preparation from Candida 
pseudotropicalis.

    (a) This enzyme preparation is derived from the nonpathogenic, 
nontoxicogenic yeast C. pseudotropicalis. It contains the enzyme 
lactase (-D-galactoside galactohydrolase, EC 3.2.1.23), which 
converts lactose to glucose and galactose. It is prepared from yeast 
that has been grown by a pure culture fermentation process.
    (b) The ingredient meets the general requirements and additional 
requirements for enzyme preparations in the Food Chemicals Codex, 3d 
ed. (1981), pp. 107-110, which are incorporated by reference in 
accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies are available 
from the National Academy Press, 2101 Constitution Ave. NW., 
Washington, DC 20418, or may be examined at the Center for Food Safety 
and Applied Nutrition's Library, 200 C St. SW., rm. 3321, Washington, 
DC, or at the Office of the Federal Register, 800 North Capitol St. 
NW., suite 700, Washington, DC.
    (c) In accordance with Sec. 184.1(b)(1), the ingredient is used in 
food with no limitations other than current good manufacturing 
practice. The affirmation of this ingredient as generally recognized as 
safe as a direct human food ingredient is based upon the following 
current good manufacturing practice conditions of use:
    (1) The ingredient is used as an enzyme, as defined in 
Sec. 170.3(o)(9) of this chapter, to convert lactose to glucose and 
galactose.
    (2) The ingredient is used in food at levels not to exceed current 
good manufacturing practice. Current good manufacturing practice is 
limited to use of this ingredient to reduce the lactose content in milk 
and milk-derived food products where food standards do not preclude 
such use.

    Dated: February 15, 1996.
Fred R. Shank,
Director, Center for Food Safety and Applied Nutrition.
[FR Doc. 96-4629 Filed 2-28-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-4628 Extension of Authority for Open-Head Fiber Drum Packaging for Liquid Hazardous Materials
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7958-7959]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4628]

[[Page 7957]]

_______________________________________________________________________

Part VII

Department of Transportation

_______________________________________________________________________

Research and Special Programs Administration

_______________________________________________________________________

49 CFR Part 171

Extension of Authority for Open-Head Fiber Drum Packaging for Liquid 
Hazardous Materials; Final Rule

Federal Register / Vol. 61, No. 41 / Thursday, February 29, 1996 / 
Rules and Regulations

[[Page 7958]]

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Part 171

[Docket No. HM-221A; Amdt. No. 171-139]
RIN 2137-AC77

Extension of Authority for Open-Head Fiber Drum Packaging for 
Liquid Hazardous Materials

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In accordance with Section 406 of the ``Interstate Commerce 
Commission Sunset Act'' (the Act), RSPA is extending the authority to 
ship certain liquid hazardous materials in open-head fiber drums that 
do not meet performance-oriented packaging standards for hazardous 
materials in Packing Group III. This extension expires on the later of 
September 30, 1997, or the date on which funds are authorized to be 
appropriated for the hazardous materials transportation program for 
fiscal years beginning after September 30, 1997.

EFFECTIVE DATE: This final rule is effective on October 1, 1996.

FOR FURTHER INFORMATION CONTACT: Frazer C. Hilder, Office of the Chief 
Counsel, Research and Special Programs Administration, U.S. Department 
of Transportation, 400 Seventh Street, SW, Washington, DC 20590-0001; 
telephone 202-366-4400.

SUPPLEMENTARY INFORMATION: On January 9, 1996, RSPA published a notice 
of proposed rulemaking (NPRM) under Docket No. HM-221A, Notice No. 96-1 
(61 FR 688), proposing to extend for one additional year, until 
September 30, 1997, authority for the transportation of certain liquid 
hazardous materials in non-specification open-head fiber drums that do 
not meet the performance-oriented packaging standards in the Hazardous 
Materials Regulations (HMR), 49 CFR Parts 171-180.
    In the absence of this extension, these open-head fiber drums would 
not be authorized for shipping these hazardous materials after 
September 30, 1996. See 49 CFR 171.14(a)(1)(iii). This is because, in a 
final rule in Docket No. HM-181 (56 FR 66124, Dec. 20, 1991), RSPA 
eliminated most instances where the HMR had previously authorized the 
use of non-specification packagings, including packagings for 
environmentally hazardous substances such as polychlorinated biphenyls. 
However, to allow for an orderly transition to the performance-oriented 
packaging standards for non-bulk packagings also adopted in HM-181, 
RSPA authorized packagings meeting the HM-181 performance standards to 
be used immediately but provided a five-year phase-out period ending on 
September 30, 1996, for previously authorized packagings.
    In the January 9, 1996 NPRM, RSPA proposed to add a new paragraph 
(a)(2)(iii) to 49 CFR 171.14 to carry out the mandate in paragraphs (a) 
and (b) of Section 406 of the Interstate Commerce Commission Sunset Act 
(Pub. L. 104-88, Dec. 29, 1995). Section 406 reads as follows:

Sec. 406. Fiber Drum Packaging.

    (a) In General.--In the administration of chapter 51 of title 
49, United States Code, the Secretary of Transportation shall issue 
a final rule within 60 days after the date of the enactment of this 
Act authorizing the continued use of fiber drum packaging with a 
removable head for the transportation of liquid hazardous materials 
with respect to those liquid hazardous materials transported by such 
drums pursuant to regulations in effect on September 30, 1991, if--
    (1) the packaging is in compliance with regulations of the 
Secretary under the Hazardous Materials Transportation Act as in 
effect on September 30, 1991; and
    (2) the packaging will not be used for the transportation of 
hazardous materials that include materials which are poisonous by 
inhalation or materials in Packing Groups I and II.
    (b) Expiration.--The regulation referred to in subsection (a) 
shall expire on the later of September 30, 1997, or the date on 
which funds are authorized to be appropriated to carry out chapter 
51 of title 49, United States Code (relating to transportation of 
hazardous materials), for fiscal years beginning after September 30, 
1997.
    (c) STUDY.--
    (1) IN GENERAL.--Within 90 days after the date of enactment of 
this Act, the Secretary shall contract with the National Academy of 
Sciences to conduct a study--
    (A) to determine whether the requirements of section 5103(b) of 
title 49, United States Code (relating to regulations for safe 
transportation), as they pertain to fiber drum packaging with a 
removable head can be met for the transportation of liquid hazardous 
materials (with respect to those liquid hazardous materials 
transported by such drums pursuant to regulations in effect on 
September 30, 1991) with standards (including fiber drum industry 
standards set forth in a June 8, 1992, exemption application 
submitted to the Department of Transportation), other than the 
performance-oriented packaging standards adopted under docket number 
HM-181 contained in part 178 of title 49, Code of Federal 
Regulations; and
    (B) to determine whether a packaging standard (including such 
fiber drum industry standards), other than performance-oriented 
packaging standards, will provide an equal or greater level of 
safety for the transportation of liquid hazardous materials than 
would be provided if such performance-oriented packaging standards 
were in effect.
    (2) COMPLETION.--The study shall be completed before March 1, 
1997, and shall be transmitted to the Committee on Commerce, 
Science, and Transportation of the Senate and the Transportation and 
Infrastructure Committee of the House of Representatives.
    (d) SECRETARIAL ACTION.--By September 30, 1997, the Secretary 
shall issue final regulations to determine what standards should 
apply to fiber drum packaging with a removable head for 
transportation of liquid hazardous materials (with respect to those 
liquid hazardous materials transported by such drums pursuant to 
regulations in effect on September 30, 1991) after September 30, 
1997. In issuing such regulations, the Secretary shall give full and 
substantial consideration to the results of the study conducted in 
subsection (c).
    In the NPRM, RSPA proposed an extension of the transition period 
for continued use of non-specification open-head fiber drums for 
certain liquid hazardous materials until September 30, 1997. 
Recognizing that the transition period might have to be extended beyond 
that date, RSPA stated its intention to revisit that issue in the 1997 
rulemaking required by section (d).
    RSPA requested comments on the proposed rule, including the 
possible extension of the transition period to the later of two dates, 
September 30, 1997, or the date on which funds are authorized to be 
appropriated to carry out the Federal hazardous materials 
transportation program for fiscal years beginning after September 30, 
1997. RSPA stated that it would ``consider alternatives that commenters 
wish to suggest for handling the uncertain length of this extended 
transition period * * *'' See 61 FR 689.
    In response to the NPRM, RSPA received 13 comments. Several 
industry commenters opposed the extension itself on safety, fairness 
and uniformity grounds. Those commenters, however, recognized that RSPA 
has no discretion and must grant the extension. Some commenters 
requested similar extensions beyond October 1, 1996, for use of other 
non-specification packagings (e.g., plastic or steel) for 
transportation of hazardous materials. Consideration of other 
extensions is beyond the scope of this rulemaking.
    Two of the commenters supported the proposed one-year extension of 
the transition period. Other commenters, including members of Congress, 
opposed the unqualified one-year extension and stated that RSPA should 
follow the mandate in section (c) and recognize an alternative to the 

[[Page 7959]]
September 30, 1997 date for termination of the fiber drum use 
extension.
    In light of these comments, RSPA is adopting the proposed rule with 
modifications. It is deleting the phrase, ``Until September 30, 1997,'' 
from the beginning of the extension language and adding the following 
separate sentence to address the duration of the extension: ``This 
authorization expires on the later of September 30, 1997, or the date 
on which funds are authorized to be appropriated to carry out chapter 
51 of title 49, United States Code (related to transportation of 
hazardous materials), for fiscal years beginning after September 30, 
1997.'' RSPA is adding the following language to provide a point of 
contact about the authorization date: ``Information concerning this 
funding authorization date may be obtained by contacting the Office of 
the Associate Administrator.''

Regulatory Analyses and Notices

A. Executive Order 12866 and DOT Regulatory Policies and Procedures

    This final rule is not considered a significant regulatory action 
under section 3(f) of Executive Order 12866 and was not reviewed by the 
Office of Management and Budget. This rule is not considered 
significant under the regulatory policies and procedures of the 
Department of Transportation (44 FR 11034; February 26, 1979). Because 
of the minimal economic impact of this final rule, preparation of a 
regulatory impact analysis or a regulatory evaluation is not warranted.

B. Executive Order 12612

    This final rule has been analyzed in accordance with the principles 
and criteria in Executive Order 12612 (``Federalism''). The Federal 
hazardous material transportation law (49 U.S.C. 5101-5127) contains an 
express preemption provision that preempts State, local and Indian 
tribe requirements on certain covered subjects. Covered subjects are:

    (i) the designation, description, and classification of 
hazardous material;
    (ii) the packing, repacking, handling, marking, and placarding 
of hazardous material;
    (iii) the preparation, execution, and use of shipping documents 
pertaining to hazardous material and requirements related to the 
number, contents, and placement of those documents;
    (iv) the written notification, recording, and reporting of the 
unintentional release in transportation; and
    (v) the design, manufacturing, fabricating, marking, 
maintenance, reconditioning, repairing, or testing of a packaging or 
a container represented, marked, certified, or sold as qualified for 
use in transporting hazardous material.

    This rule concerns the packaging authorized for certain hazardous 
materials and, therefore, preempts State, local, or Indian tribe 
requirements concerning this subject unless the non-Federal 
requirements are ``substantively the same as'' the Federal 
requirements. RSPA lacks discretion in this area, and preparation of a 
federalism assessment is not warranted.
    Section 5125(b)(2) of 49 U.S.C. provides that if DOT issues a 
regulation concerning any of the covered subjects after November 16, 
1990, DOT must determine and publish in the Federal Register the 
effective date of Federal preemption. That effective date may not be 
earlier than the 90th day, and not later than two years, following the 
date of issuance of the final rule. RSPA has determined that the 
effective date of Federal preemption for the continued authorization of 
these fiber drums will be October 1, 1996.

C. Regulatory Flexibility Act

    This final rule extends the authority for shipment of certain 
liquid hazardous materials in open-head fiber drums that do not meet 
the performance standards in the HMR. I certify that this rule will not 
have a significant economic impact on a substantial number of small 
entities.

D. Paperwork Reduction Act

    There are no information collection requirements in this final 
rule.

E. Regulation Identifier Number (RIN)

    A regulation identifier number (RIN) is assigned to each regulatory 
action listed in the Unified Agenda of Federal Regulations. The 
Regulatory Information Service Center publishes the Unified Agenda in 
April and October of each year. The RIN number contained in the 
handling of this document can be used to cross-reference this action 
with the Unified Agenda.

List of Subjects in 49 CFR Part 171

    Exports, Hazardous materials transportation, Imports, Reporting and 
recordkeeping requirements.

    In consideration of the foregoing, 49 CFR part 171 is amended as 
follows:

PART 171--GENERAL INFORMATION, REGULATIONS, AND DEFINITIONS

    1. The authority citation for part 171 continues to read as 
follows:

    Authority: 49 U.S.C. 5101-5127; 49 CFR 1.53.4
    2. In Sec. 171.14, a new paragraph (a)(2)(iii) is added to read as 
follows:

Sec. 171.14  Transitional provisions for implementing requirements 
based on the UN Recommendations.

* * * * *
    (a) * * *
    (2) * * *
    (iii) Non-specification fiber drums. A non-specification fiber drum 
with a removable head is authorized for a liquid hazardous material in 
Packing Group III that is not poisonous by inhalation for which the 
packaging was authorized under the requirements of Part 172 or Part 173 
of this subchapter in effect on September 30, 1991. This authorization 
expires on the later of September 30, 1997, or the date on which funds 
are authorized to be appropriated to carry out chapter 51 of title 49, 
United States Code (related to transportation of hazardous materials), 
for fiscal years beginning after September 30, 1997. Information 
concerning this funding authorization date may be obtained by 
contacting the Office of the Associate Administrator for Hazardous 
Materials Safety.
* * * * *
    Issued in Washington, DC, on February 22, 1996, under authority 
delegated in 49 CFR Part 1.
D.K. Sharma,
Administrator.
[FR Doc. 96-4628 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-60-M

Complete official Federal Register PDF

FR Doc. 96-4593 Groundfish of the Bering Sea and Aleutian Islands Area; Offshore Component Pollock in the Bering Sea Subarea
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7754-7755]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4593]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 675

[Docket No. 960129019-6019-01; I.D. 022396C]

Groundfish of the Bering Sea and Aleutian Islands Area; Offshore 
Component Pollock in the Bering Sea Subarea

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is prohibiting directed fishing for pollock by vessels 
catching pollock for processing by the offshore component in the Bering 
Sea subarea (BS) of the Bering Sea and Aleutian Islands management area 
(BSAI). This action is necessary to prevent exceeding the first 
seasonal allowance of the pollock total allowable catch (TAC) 
apportioned to vessels harvesting pollock for processing by the 
offshore component in the BS.

EFFECTIVE DATE: 12 noon, Alaska local time (A.l.t.), February 26, 1996, 
until 12 noon, A.l.t., April 15, 1996.

FOR FURTHER INFORMATION CONTACT: Mary Furuness, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by the NMFS according to the Fishery 
Management Plan for the Groundfish Fishery of the Bering Sea and 
Aleutian Islands Area (FMP) prepared by the North Pacific Fishery 
Management Council under authority of the Magnuson Fishery Conservation 
and Management Act. Fishing by U.S. vessels is governed by regulations 
implementing the FMP at 50 CFR parts 620 and 675.
    In accordance with Sec. 675.20(a)(7)(ii), the first seasonal 
allowance of pollock 

[[Page 7755]]
for vessels catching pollock for processing by the offshore component 
in the BS was established by the Final 1996 Harvest Specifications of 
Groundfish (61 FR 4311, February 5, 1996) as 295,864 metric tons (mt).
    The Director, Alaska Region, NMFS (Regional Director), has 
determined in accordance with Sec. 675.20(a)(8), that the first 
seasonal allowance of pollock TAC for vessels catching pollock for 
processing by the offshore component in the BS soon will be reached. 
Therefore, the Regional Director has established a directed fishing 
allowance of 273,864 mt with consideration that 22,000 mt will be taken 
as incidental catch in directed fishing for other species in the BS. 
Consequently, NMFS is prohibiting directed fishing for pollock by 
vessels catching pollock for processing by the offshore component in 
the BS. This closure is effective 12 noon, February 26, 1996, until 12 
noon, A.l.t., April 15, 1996. Under Sec. 675.20(a)(2)(ii), the second 
seasonal allowance will become available 12 noon, A.l.t., August 15 
through the end of the fishing year.
    Maximum retainable bycatch amounts for applicable gear types may be 
found in the regulations at Sec. 675.20(h).

Classification

    This action is taken under Sec. 675.20 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: February 23, 1996.
Donald J. Leedy,
Acting Director, Office of Fisheries Conservation and Management, 
National Marine Fisheries Service.
[FR Doc. 96-4593 Filed 2-26-96; 11:25 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-4592 Groundfish of the Bering Sea and Aleutian Islands Area; Species in the Rock Sole/Flathead Sole/``Other Flatfish'' Fishery Category by Vessels Using Trawl Gear
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Page 7755]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4592]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 675

[Docket No. 960129019-6019-01; I.D. 022396D]

Groundfish of the Bering Sea and Aleutian Islands Area; Species 
in the Rock Sole/Flathead Sole/``Other Flatfish'' Fishery Category by 
Vessels Using Trawl Gear

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is closing the directed fishery for species in the rock 
sole/flathead sole/``other flatfish'' fishery category by vessels using 
trawl gear in the Bering Sea and Aleutian Islands management area 
(BSAI). This action is necessary to prevent exceeding the first 
seasonal bycatch allowance of Pacific halibut apportioned to the trawl 
rock sole/flathead sole/``other flatfish'' fishery category in the 
BSAI.

EFFECTIVE DATE: 12 noon, Alaska local time (A.l.t.), February 26, 1996, 
until 12 noon, A.l.t., April 1, 1996.

FOR FURTHER INFORMATION CONTACT: Andrew N. Smoker, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for the Groundfish Fishery of the Bering Sea and Aleutian Islands 
Area (FMP) prepared by the North Pacific Fishery Management Council 
under authority of the Magnuson Fishery Conservation and Management 
Act. Fishing by U.S. vessels is governed by regulations implementing 
the FMP at 50 CFR parts 620 and 675.
    The first seasonal bycatch allowance of Pacific halibut for the 
BSAI trawl rock sole/flathead sole/``other flatfish'' fishery category, 
which is defined at Sec. 675.21(b)(1)(iii)(B)(2), was established by 
the Final 1996 Harvest Specifications of Groundfish (61 FR 4311, 
February 5, 1996) as 453 metric tons.
    The Director, Alaska Region, NMFS, has determined, in accordance 
with Sec. 675.21(c)(1)(iii), that the first seasonal bycatch allowance 
of Pacific halibut apportioned to the trawl rock sole/flathead sole/
``other flatfish'' fishery in the BSAI has been caught. Therefore, NMFS 
is prohibiting directed fishing for species in the rock sole/flathead 
sole/``other flatfish'' fishery category by vessels using trawl gear in 
the BSAI.
    Maximum retainable bycatch amounts for applicable gear types may be 
found in the regulations at Sec. 675.20(h).

Classification

    This action is taken under 50 CFR 675.21 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: February 23, 1996.
Donald J. Leedy,
Acting Director, Office of Fisheries Conservation and Management, 
National Marine Fisheries Service.
[FR Doc. 96-4592 Filed 2-26-96; 11:25 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-4587 Removal of U.S. Grade Standards
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7687-7688]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4587]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 41 /  Thursday, February 29, 1996 / 
Rules and Regulations

[[Page 7687]]

DEPARTMENT OF AGRICULTURE

Grain Inspection, Packers and Stockyards Administration

7 CFR Part 868

Removal of U.S. Grade Standards

AGENCY: Grain Inspection, Packers and Stockyards Administration.

ACTION: Interim final rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: This rule will remove the voluntary U.S. grade standards for 
Beans, Whole Dry Peas, Split Peas, and Lentils from the Code of Federal 
Regulations (CFR). These are an accumulation of regulations which have 
been developed for more than 75 years to facilitate the marketing of 
agricultural commodities by providing a uniform language which may be 
used to describe the quality of various agricultural commodities as 
valued in the marketplace. The voluntary standards and all subsequent 
revisions or new standards will be made available in a separate 
publication. This regulatory action is being taken as part of the 
National Performance Review program to eliminate unnecessary 
regulations and improve those that remain in force.
    In carrying out this responsibility, the Administrator of the Grain 
Inspection, Packers and Stockyards Administration (GIPSA), will ensure 
that proposed, new or revised voluntary standards will appear in the 
``Notices'' section of the Federal Register and that the public will 
have an opportunity to comment.

EFFECTIVE DATE: February 29, 1996. Comments must be received by April 
29, 1996.

ADDRESSES: Interested persons are invited to submit written comments 
concerning this interim final rule. Written comments may mailed or 
faxed to George Wollam, Regulatory Liaison, USDA, GIPSA, Room 0623-S, 
P.O. Box 96454, Washington, DC 20090-6454; FAX (202) 720-4628. Comments 
may also be sent by electronic mail or Internet to: 
[email protected].
    All comments received will be available for public inspection 
during regular business hours in Room 0623-South Building, 1400 
Independence Avenue, S.W., Washington, D.C. (7 CFR 1.27(b)).

FOR FURTHER INFORMATION CONTACT: George Wollam (202) 720-0292.

SUPPLEMENTARY INFORMATION: This regulatory action is being taken as 
part of the National Performance Review program to eliminate 
unnecessary regulations and improve those that remain in force.

Executive Order 12866

    The Department of Agriculture (Department) is issuing this rule in 
conformance with Executive Order 12866.

Executive Order 12778

    This rule has been reviewed under Executive Order 12778, Civil 
Justice Reform. This rule is not intended to have preemptive effect 
with respect to any State or local laws, regulations, or policies 
unless they present an irreconcilable conflict with this rule. This 
rule is not intended to have retroactive effect. There are no 
administrative procedures which must be exhausted prior to any judicial 
challenge to this rule or the application of its provisions.

Effect on Small Entities

    This action was reviewed under the Regulatory Flexibility Act (RFA) 
(5 U.S.C 601 et seq.). The Administrator of (GIPSA) has determined that 
this action will not have a significant economic impact on a 
substantial number of small entities. Although this action will remove 
provisions from the CFR, small entities should see no changes as the 
standards will be administered under the direction of the Administrator 
to ensure public input to their formulation and convenient availability 
to those who want copies of the standards.

Paperwork Reduction Act

    In accordance with the provisions of the Paperwork Reduction Act, 
the information collection requirements contained in the provisions to 
be amended have been previously approved by the Office of Management 
and Budget under control number 0580-0013.

Background

    The Grain Inspection, Packers and Stockyards Administration is 
delegated by the Secretary of Agriculture, under the Agricultural 
Marketing Act of 1946 (AMA), to provide programs for Federal grading/
certification services and to develop and establish efficient marketing 
methods and practices for designated agricultural commodities. For many 
years these agricultural programs have facilitated the marketing of 
agricultural commodities by developing official U.S. grade standards 
which provide uniform language that may be used to describe the 
characteristics of more than 19 commodities as valued by the market 
place. The AMA standards are widely used in private contracts, 
government procurement, marketing communication and, for some 
commodities, consumer information. The standards through the years have 
been promulgated as regulations and codified in the CFR.
    Rapid changes in consumer preferences, together with associated 
changes in commodity characteristics, processing technology, and 
marketing practices have out paced the revision or issuance of 
regulations. As a result, industry and the marketplace could be 
burdened with outdated trading language. The President's regulatory 
review initiative has provided the impetus to develop new approaches to 
develop new approaches to meet more effectively the needs of U.S. 
industry, government agencies, and consumers and still reduce the 
regulatory burden.
    To meet this initiative, regulations that are currently in the CFR 
which could be administered under the authority of GIPSA are being 
removed from the CFR. With respect to the official grade standards 
except those used to implement government price support. Therefore, the 
grade standards for Rice (7 CFR Secs. 868.201-316) will continue to 
appear in the CFR, although the text will also be available from GIPSA, 
along with other grade standards.
    This rule eliminates selected regulations which encompass 
approximately 22 pages of the CFR covering: Standards for Beans, Whole 
Dry Peas, Split Peas, and Lentils. 

[[Page 7688]]

    The following is an outline of those standards being removed from 
the CFR.

------------------------------------------------------------------------
  CFR section        Title of standards being  removed from the CFR     
------------------------------------------------------------------------
868.101-142...  Subpart B--United States Standards for Beans.           
868.401-410...  Subpart F--United States Standards for Whole Dry Peas.  
868.501-510...  Subpart G--United States Standards for Split Peas.      
868.601-611...  Subpart H--United States Standards for Lentils.         
------------------------------------------------------------------------

    To ensure that these standards will be developed, issued, and 
revised in accordance with procedures that continue to ensure a fair 
and open process, all new and proposed revisions to standards being 
removed from the CFR's will be published in the Federal Register as 
``Notice'' with adequate time for public comment. A final version of 
the standard will also be published in the Federal Register.
    In developing or revising existing grade standards, the 
Administrator must first determine that a new or revised standard is 
needed to facilitate trade in a particular commodity. Second, because 
use of the standards is voluntary, there must be demonstrated interest 
and support from the affected industry or other interested parties. And 
third, the standards must be practical to use.
    The initial requests for development or revision of a standard may 
come from the industry, trade or consumer groups, State departments of 
agriculture, the U.S. Department of Agriculture, or others. Once a 
request has been received, GIPSA will coordinate procedures to gather 
information needed to move forward with the new or revised standard. 
After this process is completed, a notice of proposed standards change 
will be published in the Federal Register to solicit comment from any 
interested parties (normally 30 to 60 days). After evaluating the 
comments received from interested parties, GIPSA will determine whether 
to proceed, develop a new proposal, or terminate the process. The 
public will be informed through a press release and notice in the 
Federal Register.
    In addition to publication in the Federal Register, GIPSA will 
distribute copies of each standard on request as a pamphlet or other 
means under the direction of the Administrator of GIPSA.
    Pursuant to 5 U.S.C. 553, it is also found and determined upon good 
cause that it is impracticable, unnecessary, and contrary to the public 
interest to give preliminary notice prior to putting this rule into 
effect and that good cause exists for not postponing the effective date 
of this rule until 30 days after publication in the Federal Register 
because: (1) The standards are voluntary; (2) no changes are being made 
to the standards by this docket, and (3) this is in-line with the 
President's regulatory review initiative.

List of Subjects in 7 CFR Part 868

    Administrative practice and procedures, Agricultural commodities, 
Beans, Whole Dry Peas, Split Peas, and Lentils.

    For the reasons set forth in the preamble, 7 CFR Part 868 is 
amended as follows:

PART 868--GENERAL REGULATIONS AND STANDARDS FOR CERTAIN 
AGRICULTURAL COMMODITIES

    1. The authority citation for Part 868 continues to read as 
follows:

    Authority: Secs. 202-208, 60 Stat. 1087, as amended (7 U.S.C. 
1621 et seq.).

Subpart B (Secs. 868.101-868.142)--[Removed and Reserved]

    2. In part 868, Subpart B (Secs. 868.101 through 868.142) is 
removed and reserved.

Subpart F (Secs. 868.401-868.410)--[Removed]

    3. In part 868, Subpart F (Secs. 868.401 through 868.410) is 
removed.

Subpart G (Secs. 868.501-868.510)--[Removed]

    4. In part 868, Subpart G (Secs. 868.501 through 868.510) is 
removed.

Subpart H (Secs. 868.601-868.611)--[Removed]

    5. In part 868, Subpart H (Secs. 868.601 through 868.611) is 
removed.
David R. Shipman,
Acting Administrator.
[FR Doc. 96-4587 Filed 2-28-96; 8:45 am]
BILLING CODE 3410-EN-P

Complete official Federal Register PDF

FR Doc. 96-4585 Elimination of Unnecessary Codifications
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7942-7944]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4585]

[[Page 7941]]

_______________________________________________________________________

Part IV

Department of Housing and Urban Development

_______________________________________________________________________

Office of the Secretary

_______________________________________________________________________

24 CFR Subtitle A, et al.

Elimination of Unnecessary Codifications; Final Rule

Federal Register / Vol. 61, No. 41 / Thursday, February 29, 1996 / 
Rules and Regulations 

[[Page 7942]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Office of the Secretary

24 CFR Subtitle A, Subtitle B, and Parts 200, 202a, 222, 233, 241, 
260, 266, 267 and 850

[Docket No. FR-3993-F-01]
RIN 2501-AC14

Elimination of Unnecessary Codifications

AGENCY: Office of the Secretary, HUD.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule removes from title 24 of the Code of Federal 
Regulations the Department's codified appendices, parts, subparts, and 
text which are unnecessary. Following a review of existing HUD 
regulations in accordance with the President's regulatory reinvention 
initiative, the Department has determined that the codified appendices, 
parts, subparts, and text identified in this rule are unnecessary to be 
retained in the Code of Federal Regulations because the programs will 
not receive additional funding; no regulatory requirements are included 
in the codifications and, therefore, the provisions need not be 
codified or can be provided through other non-rulemaking means; e.g., 
notices or handbooks; the regulatory text is duplicative and can be 
found elsewhere; the program has ended; or there are only a few 
outstanding mortgages or contracts under the program.
    This final rule also removes several provisions describing cross-
cutting definitions and HUD's waiver authority that were not addressed 
in the Department's final rule creating part 5, which was published on 
February 9, 1996. Part 5 was designed to set forth those definitions 
and program requirements which cut across several of the Department's 
programs.

EFFECTIVE DATE: April 1, 1996.

FOR FURTHER INFORMATION CONTACT: Camille E. Acevedo, Assistant General 
Counsel for Regulations, Department of Housing and Urban Development, 
Room 10276, 451 Seventh Street, SW, Washington, DC 20410. Telephone: 
(202) 708-3055; TDD: (202) 708-3259.

SUPPLEMENTARY INFORMATION:

A. Elimination of Unnecessary Codifications

    President Clinton's memorandum of March 4, 1995, titled 
``Regulatory Reinvention Initiative'' directed heads of Federal 
departments and agencies to review all existing regulations to 
eliminate those that are outdated and modify others to increase 
flexibility and reduce burden. As a part of HUD's overall effort to 
reduce regulatory burden and streamline the content of title 24 of the 
Code of Federal Regulations, this rule removes those appendices, parts, 
subparts, and text which are unnecessary. Guidance presently provided 
in these appendices codified will be available through other non-
rulemaking means.
    To the extent that regulations are needed to implement new 
legislation, they will be issued separately from this document. Any 
determination to issue new regulations will be carefully considered to 
ensure that it is consistent with the President's regulatory reform 
efforts and the principles in Executive Order 12866.
    Appendices unnecessary because the programs will not receive 
additional funding: 24 CFR Subtitle A, Appendices A and B. Appendices A 
and B of Subtitle A, which contain the program guidelines for the HOPE 
1 and HOPE 2 programs will be removed.

    Note: HOPE 1 (Appendix A) implementation and planning grantees 
will comply with the HOPE 1 program guidelines published in the 
Federal Register on January 14, 1992, at 57 FR 1527, as modified by 
any subsequent Federal statutory enactments or executive orders. 
HOPE 2 (Appendix B) implementation and planning grantees will comply 
with the HOPE 2 program guidelines published in the Federal Register 
on January 14, 1992, at 57 FR 1562, as modified by any subsequent 
Federal statutory enactments or executive orders. Grantees for both 
programs also remain subject to any requirements set forth in the 
implementation or planning grant agreement, as applicable, including 
HUD handbooks and notices.

    Appendices and subparts unnecessary because no regulatory 
requirements are included and the provisions need not be codified or 
can be provided through other non-rulemaking means; e.g., notices or 
handbooks: 24 CFR Subtitle B, Chapter I, Subchapter A, Appendices II, 
III and IV; 24 CFR part 200, subparts A, C, and D (except for 
Sec. 200.93); 24 CFR part 265.
    Removal of Appendices. Appendices II, III, and IV of Subtitle B, 
Chapter I, Subchapter II contain the Fair Housing Accessibility 
Guidelines, the preamble to the final Fair Housing Accessibility 
Guidelines, and a document entitled ``Questions and Answers about the 
Fair Housing Accessibility Guidelines. The Fair Housing Accessibility 
Guidelines are not mandatory, nor do they prescribe specific 
requirements which must be met and which if not met, would constitute 
unlawful discrimination under the Fair Housing Act. The purpose of the 
guidelines is to provide technical guidance on designing dwelling units 
as required by the Fair Housing Amendments Act. Removal of the 
Guidelines will make it easier for HUD to update the Guidelines, if 
necessary and appropriate, to address issues that may arise with 
respect to new types of designs for dwelling units (the CFR is updated 
only once a year).

    Note: Copies of the Fair Housing Accessibility Guidelines 
(Appendix II), the preamble to the final Fair Housing Act 
Accessibility Guidelines (Appendix III), and the document entitled 
``Questions and Answers about the Fair Housing Accessibility 
Guidelines'' (Appendix IV) are available from the Office of Fair 
Housing and Equal Opportunity, Department of Housing and Urban 
Development, Room 5230, 451 Seventh Street, SW, Washington, DC 
20410, telephone (202) 708-0288. Hearing or speech-impaired 
individuals may call HUD's TDD number (202) 708-0113 or 1-800-877-
8399 (Federal Information Relay Service TDD). Other than the 800 
number, these are not toll-free numbers.

    Removal of Subparts A, C and D from Part 200. Subparts A, C, and D 
of part 200 pertain to origin and establishment, organization and 
management, and delegations to particular positions, respectively. 
These provisions need not be codified (except for Sec. 200.93) and will 
be made available through non-rulemaking means. Section 200.93 
(presently contained in subpart D) pertains to the membership and 
functions of the Multifamily Participation Review Committee and is 
being retained as a new Sec. 200.227 within subpart H.
    Subpart unnecessary because the regulatory text is duplicative and 
can be found elsewhere by cross-reference: Subpart I of 24 CFR part 200 
is being removed except for Sec. 200.300, pertaining to 
nondiscrimination and fair housing policy, which is being retained with 
minor editorial revisions to maintain the cross-references to the 
controlling regulations.
    Part unnecessary because the program has ended or was never 
implemented: 24 CFR parts 202a and 260.
    Part 202a, which pertains to Title I Mortgage Insurance, is being 
removed because the program has expired. Part 260 pertains to Interest 
Subsidy Grants, for which regulations were promulgated, but the program 
was never implemented.
    Parts for expiring programs, under which there are only a few 
outstanding mortgages, contracts or grants: 24 CFR part 850.
    No new grants have been issued under part 850, the Housing 
Development Grants Program. This is an expiring program.

[[Page 7943]]

    Note: The grants associated with part 850 (Housing Development 
grants) will continue to be administered under the regulations that 
existed immediately before April 1, 1996.

    B. Cross-Cutting requirements. Continued consolidation of certain 
cross-cutting requirements.
    On February 9, 1996 (61 FR 5198), the Department published a final 
rule creating a new 24 CFR part 5. HUD established part 5 to set forth 
those requirements which are applicable to one or more program 
regulations. Consolidation of these requirements in part 5 will 
eliminate redundancy in title 24 and assist in the Department's overall 
efforts to streamline the content of its regulations.
    This rule removes Secs. 222.248, 233.248, 266.35, and 267.4 which 
set forth the Department's waiver authority. Further, this rule also 
removes the definition of the term ``Secretary'' in Sec. 241.1. HUD's 
waiver authority and the definition of ``Secretary'' are already set 
forth in 24 CFR part 5.

Justification for Final Rule

    In accordance with 24 CFR part 10, it is the practice of the 
Department to offer interested parties the opportunity to comment on 
proposed regulations. However, this rule merely removes unnecessary 
appendices, parts, subparts and text from title 24 of the Code of 
Federal Regulations. Removal of these codifications does not establish 
or affect substantive policy. Therefore, the Department has determined 
that public comment is unnecessary and contrary to the public interest.

Other Matters

Environmental Review

    This rulemaking does not have an environmental impact. This 
rulemaking simply amends existing regulations by removing unnecessary 
provisions and does not alter the environmental effect of the 
regulations being amended. Findings of No Significant Impact with 
respect to the environment were made in accordance with HUD regulations 
in 24 CFR part 50 that implement section 102(2)(C) of the National 
Environmental Policy Act of 1969 (42 U.S.C. 4332) at the time of 
development of the implementing regulations. Those Findings remain 
applicable to this rule and are available for public inspection between 
7:30 a.m. and 5:30 p.m. weekdays in the Office of the Rules Docket 
Clerk at the above address.

Regulatory Flexibility Act

    The Secretary, in accordance with the Regulatory Flexibility Act (5 
U.S.C. 605(b)), has reviewed this rule before publication and by 
approving it certifies that this rule does not have a significant 
economic impact on a substantial number of small entities because this 
rule pertains to the administrative matter of removing unnecessary 
codifications from the Code of Federal Regulations.

Executive Order 12612, Federalism

    The General Counsel, as the Designated Official under section 6(a) 
of Executive Order 12612, Federalism, has determined that this rule 
does not have ``federalism implications'' because it does not have 
substantial direct effects on the States (including their political 
subdivisions) or on the distribution of power and responsibilities 
among the various levels of government.

Executive Order 12606, The Family

    The General Counsel, as the Designated Official under Executive 
Order 12606, The Family, has determined that this rule does not have 
potential significant impact on family formation, maintenance, and 
general well-being.

List of Subjects

24 CFR Part 200

    Administrative practice and procedure, Claims, Equal employment 
opportunity, Fair housing, Home improvement, Housing standards, 
Incorporation by reference, Lead poisoning, Loan programs--housing and 
community development, Minimum property standards, Mortgage insurance, 
Organization and functions (Government agencies), Penalties, Reporting 
and recordkeeping requirements, Social security, Unemployment 
compensation, Wages.

24 CFR Part 202a

    Mortgage insurance.

24 CFR Part 222

    Condominiums, Military personnel, Mortgage insurance.

24 CFR Part 233

    Home improvement, Loan programs--housing and community development, 
Mortgage insurance, Reporting and recordkeeping requirements.

24 CFR Part 241

    Energy conservation, Home improvement, Loan programs--housing and 
community development, Mortgage insurance, Reporting and recordkeeping 
requirements, Solar energy.

24 CFR Part 260

    Grant programs--housing and community development, Low and moderate 
income housing.

24 CFR Part 266

    Aged, Fair housing, Intergovernmental relations, Mortgage 
insurance, Low and moderate income housing, Reporting and recordkeeping 
requirements.

24 CFR Part 267

    Appraisals, Mortgage insurance, Property valuation, Reporting and 
recordkeeping requirements.

24 CFR Part 850

    Grant programs--housing and community development, Low and moderate 
income housing, Reporting and recordkeeping requirements.

    Accordingly, pursuant to the Secretary's authority under 42 U.S.C. 
3535(d), subtitle A, subtitle B, and parts 200, 202a, 222, 233, 241, 
260, 266, 267, and 850 of title 24 of the Code of Federal Regulations 
are amended as follows:

Subtitle A--Office of the Secretary, Department of Housing and Urban 
Development

Appendices A and B of Subtitle A [Removed]

    1. Appendices A and B to subtitle A are removed.

Subtitle B--Regulations Relating to Housing and Urban Development

CHAPTER I--OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, 
DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Subchapter A--Fair Housing

Appendices II, III, and IV of Subtitle B, Chapter I, Subchapter A 
[Removed]

    2. Subtitle B, chapter I, subchapter A is amended by removing 
Appendices II, III, and IV.

PART 200--INTRODUCTION

    3. Part 200 is amended:

Subparts A and C  [Removed and Reserved]

    a. By removing and reserving subparts A (Secs. 200.1 through 200.4) 
and C (Secs. 200.40 through 200.44);

Sec. 200.93  [Redesignated as Sec. 200.27]

    b. By redesignating Sec. 200.93 as Sec. 200.227;

Subpart D  [Removed and Reserved]

    c. By removing and reserving subpart D (Secs. 200.50 through 
200.129); 

[[Page 7944]]

Sec. 200.224  [Amended]

    d. By amending Sec. 200.224 by removing the reference to 
``Sec. 200.93'', and adding in its place ``Sec. 200.227''; and
    e. By revising subpart I, to read as follows:

Subpart I--Nondiscrimination and Fair Housing

Sec. 200.300  Nondiscrimination and fair housing policy.

    Federal Housing Administration programs shall be administered in 
accordance with:
    (a) The nondiscrimination and fair housing requirements set forth 
in 24 CFR part 5; and
    (b) The affirmative fair housing marketing requirements in 24 CFR 
part 200, subpart M and 24 CFR part 108.

PART 202a [REMOVED]

    4. Part 202a is removed.

PART 222--SERVICEPERSON'S MORTGAGE INSURANCE

Sec. 222.248  [Removed]

    5. Section 222.248 is removed.

PART 233--EXPERIMENTAL HOUSING MORTGAGE INSURANCE

Sec. 233.248  [Removed]

    6. Section 233.248 and the undesignated heading preceding it are 
removed.

PART 241--SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES

Sec. 241.1  [Amended]

    7. Section 241.1 is amended by removing paragraph (j) and by 
redesignating paragraphs (k) and (l) and paragraphs (j) and (k), 
respectively.

PART 260 [REMOVED]

    8. Part 260 is removed.

PART 266--HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED 
AFFORDABLE MULTIFAMILY PROJECT LOANS

Sec. 266.35  [Removed]

    9. Section 266.35 is removed.

PART 267--APPRAISAL AND PROPERTY VALUATION

Sec. 267.4  [Removed]

    10. Section 267.4 is removed.

PART 850--HOUSING DEVELOPMENT GRANTS

    11. Section 850.1 is revised to read as follows:

Sec. 850.1  Applicability and savings clause.

    (a) Applicability. This part implements the Housing Development 
Grant Program contained in section 17 of the United States Housing Act 
of 1937 (42 U.S.C. 1437o). The Program authorized the Secretary to make 
housing development grants to support the new construction or 
substantial rehabilitation of real property to be used primarily for 
residential rental purposes. Section 289(b)(1) of the Cranston-Gonzalez 
National Affordable Housing Act (42 U.S.C. 12839) repealed section 17 
effective October 1, 1991. Section 289(a) prohibited new grants under 
the Housing Development Grant Program except for projects for which 
binding commitments had been entered into prior to October 1, 1991.
    (b) Savings clause. Any grant made pursuant to a binding commitment 
entered into before October 1, 1991 will continue to be governed by 
subparts A through E of this part in effect immediately before April 1, 
1996, and by subpart F of this part as currently in effect.

Sec. 850.3  [Removed]

    12. Section 850.3 is removed.

Subparts B, C, D, and E  [Removed and Reserved]

    13. Subparts B (Secs. 850.11 through 850.17), C (Secs. 850.31 
through 850.39), D (Secs. 850.61 through 850.79), and E (Secs. 850.101 
through 850.107) are removed and reserved.

    Dated: February 22, 1996.
Henry G. Cisneros,
Secretary.
[FR Doc. 96-4585 Filed 2-28-96; 8:45 am]
BILLING CODE 4210-32-P

Complete official Federal Register PDF

FR Doc. 96-4570 Approval and Promulgation of Implementation Plans; California State Implementation Plan Revision, Mojave Desert Air Quality Management District and Ventura County Air Pollution Control District
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7706-7709]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4570]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[CA 71-10-7281a; FRL-5422-9]

Approval and Promulgation of Implementation Plans; California 
State Implementation Plan Revision, Mojave Desert Air Quality 
Management District and Ventura County Air Pollution Control District

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is taking direct final action on revisions to the 
California State Implementation Plan. The revisions concern rules from 
the Mojave Desert Air Quality Management District (MDAQMD) and the 
Ventura County Air 

[[Page 7707]]
Pollution Control District (VCAPCD). This approval action will 
incorporate these rules into the federally approved SIP. The intended 
effect of approving these rules is to regulate emissions of volatile 
organic compounds (VOCs) in accordance with the requirements of the 
Clean Air Act, as amended in 1990 (CAA or the Act). The rules control 
VOC emissions from asphalt roofing operation, semiconductor 
manufacturing operations, and glycol dehydrators. Thus, EPA is 
finalizing the approval of these revisions into the California SIP 
under provisions of the CAA regarding EPA action on SIP submittals, 
SIPs for national primary and secondary ambient air quality standards 
and plan requirements for nonattainment areas.

DATES: This action is effective on April 29, 1996 unless adverse or 
critical comments are received by April 1, 1996. If the effective date 
is delayed, a timely notice will be published in the Federal Register.

ADDRESSES: Copies of the rule revisions and EPA's evaluation report for 
each rule are available for public inspection at EPA's Region IX office 
during normal business hours. Copies of the submitted rule revisions 
are available for inspection at the following locations:

Rulemaking Section (A-5-3), Air and Toxics Division, U.S. Environmental 
Protection Agency, Region IX, 75 Hawthorne Street, San Francisco, CA 
94105
Environmental Protection Agency, Air Docket (6102), 401 ``M'' Street, 
S.W., Washington, D.C. 20460
California Air Resources Board, Stationary Source Division, Rule 
Evaluation Section, 2020 ``L'' Street, Sacramento, CA 95814
Mojave Desert Air Quality Management District, 15428 Civic Drive, Suite 
200, Victorville, CA 92392
Ventura County Air Pollution Control District, 669 County Square Drive, 
Ventura, CA 93003

FOR FURTHER INFORMATION CONTACT: Patricia A. Bowlin, Rulemaking Section 
(A-5-3), Air and Toxics Division, U.S. Environmental Protection Agency, 
Region IX, 75 Hawthorne Street, San Francisco, CA 94105, Telephone: 
(415) 744-1188.

SUPPLEMENTARY INFORMATION:

Applicability

    The rules being approved into the California SIP include: MDAQMD 
Rule 471, Asphalt Roofing Operations; VCAPCD Rule 74.28, Asphalt 
Roofing Operations; VCAPCD Rule 74.21, Semiconductor Manufacturing; 
VCAPCD Rule 71.5, Glycol Dehydrators; and VCAPCD Rule 71, Crude Oil and 
Reactive Organic Compound Liquids. The California Air Resources Board 
submitted these rules to EPA on December 22, 1994; November 18, 1993; 
July 13, 1994; and February 24, 1995 (Rules 71 and 71.5) respectively.

Background

    On March 3, 1978, EPA promulgated a list of ozone nonattainment 
areas under the provisions of the Clean Air Act, as amended in l977 
(1977 Act or pre-amended Act), that included the Southeast Desert 
Modified AQMA Area 1 and the Ventura County Area. 43 FR 8964, 40 
CFR 81.305. On May 26, 1988, EPA notified the Governor of California, 
pursuant to section 110(a)(2)(H) of the 1977 Act, that the above 
districts' portions of the California SIP were inadequate to attain and 
maintain the ozone standard and requested that deficiencies in the 
existing SIP be corrected (EPA's SIP-Call). On November 15, 1990, the 
Clean Air Act Amendments of 1990 were enacted. Pub. L. 101-549, 104 
Stat. 2399, codified at 42 U.S.C. 7401-7671q. In amended section 
182(a)(2)(A) of the CAA, Congress statutorily adopted the requirement 
that nonattainment areas fix their deficient reasonably available 
control technology (RACT) rules for ozone and established a deadline of 
May 15, 1991 for states to submit corrections of those deficiencies.

    \1\ Portions of MDAQMD lie within the Southeast Desert Modified 
AQMA Area.
---------------------------------------------------------------------------

    Section 182(a)(2)(A) applies to areas designated as nonattainment 
prior to enactment of the amendments and classified as marginal or 
above as of the date of enactment. It requires such areas to adopt and 
correct RACT rules pursuant to pre-amended section 172(b) as 
interpreted in pre-amendment guidance.2 EPA's SIP-Call used that 
guidance to indicate the necessary corrections for specific 
nonattainment areas. The Southeast Desert Modified AQMA Area is 
classified as Severe-17, and the Ventura County Area is classified as 
Severe-15 3; therefore, these areas were subject to the RACT fix-
up requirement and the May 15, 1991 deadline.

    \2\ Among other things, the pre-amendment guidance consists of 
those portions of the proposed Post-1987 ozone and carbon monoxide 
policy that concern RACT, 52 FR 45044 (November 24, 1987); ``Issues 
Relating to VOC Regulation Cutpoints, Deficiencies, and Deviations, 
Clarification to Appendix D of November 24, 1987 Federal Register 
Notice'' (Blue Book) (notice of availability was published in the 
Federal Register on May 25, 1988); and the existing control 
technique guidelines (CTGs).
    \3\ Southeast Desert Modified AQMA Area and Ventura County Area 
retained their designations of nonattainment and were classified by 
operation of law pursuant to sections 107(d) and 181(a) upon the 
date of enactment of the CAA. See 55 FR 56694 (November 6, 1991).
---------------------------------------------------------------------------

    The State of California submitted many revised RACT rules for 
incorporation into its SIP on December 22, 1994; November 18, 1993; 
July 13, 1994; and February 24, 1995, including the rules being acted 
on in this notice. This notice addresses EPA's direct-final action for 
MDAQMD Rule 471, Asphalt Roofing Operations; VCAPCD Rule 74.28, Asphalt 
Roofing Operations; VCAPCD Rule 74.21, Semiconductor Manufacturing; 
VCAPCD Rule 71.5, Glycol Dehydrators; and VCAPCD Rule 71, Crude Oil and 
Reactive Organic Liquids. The MDAQMD adopted Rule 471 on December 21, 
1994. The VCAPCD adopted Rule 74.28 on May 10, 1994; Rule 74.21 on 
April 6, 1993; and Rules 71.5 and 71 on December 13, 1994. These 
submitted rules were found to be complete on January 3, 1995; September 
12, 1994; December 23, 1993; and March 10, 1995 pursuant to EPA's 
completeness criteria that are set forth in 40 CFR part 51 Appendix V 
4 and are being finalized for approval into the SIP.

    \4\ EPA adopted the completeness criteria on February 16, 1990 
(55 FR 5830) and, pursuant to section 110(k)(1)(A) of the CAA, 
revised the criteria on August 26, 1991 (56 FR 42216).
---------------------------------------------------------------------------

    The submitted rules control VOC emissions from the operation of 
roofing kettles, the manufacture of semiconductors, and the use of 
glycol dehydrators. VOCs contribute to the production of ground level 
ozone and smog. The rules were adopted as part of each district's 
efforts to achieve the National Ambient Air Quality Standard (NAAQS) 
for ozone and in response to EPA's SIP-Call and the section 
182(a)(2)(A) CAA requirement. The following is EPA's evaluation and 
final action for these rules.

EPA Evaluation and Action

    In determining the approvability of a VOC rule, EPA must evaluate 
the rule for consistency with the requirements of the CAA and EPA 
regulations, as found in section 110 and part D of the CAA and 40 CFR 
part 51 (Requirements for Preparation, Adoption, and Submittal of 
Implementation Plans). The EPA interpretation of these requirements, 
which forms the basis for today's action, appears in the various EPA 
policy guidance documents listed in footnote 2. Among those provisions 
is the requirement that a VOC rule must, at a minimum, provide for the 
implementation of RACT for stationary sources of VOC emissions. This 
requirement was carried forth from the pre-amended Act. 

[[Page 7708]]

    For the purpose of assisting state and local agencies in developing 
RACT rules, EPA prepared a series of Control Technique Guideline (CTG) 
documents. The CTGs are based on the underlying requirements of the Act 
and specify the presumptive norms for what is RACT for specific source 
categories. Under the CAA, Congress ratified EPA's use of these 
documents, as well as other Agency policy, for requiring States to 
``fix-up'' their RACT rules. See section 182(a)(2)(A). There is no CTG 
applicable to any of the rules being considered in this notice. For 
source categories that do not have an applicable CTG (such as asphalt 
roofing operations, semiconductor manufacturing, or glycol 
dehydrators), state and local agencies may determine what controls are 
required by reviewing the operation of facilities subject to the 
regulation and evaluating regulations for similar sources in other 
areas. Further interpretations of EPA policy are found in the Blue 
Book, referred to in footnote 2. In general, these guidance documents 
have been set forth to ensure that VOC rules are fully enforceable and 
strengthen or maintain the SIP.
    MDAQMD's revised Rule 471, Asphalt Roofing Operations, includes the 
following significant changes from the current SIP version:
     Added definitions for eight (8) rule-specific terms.
     Deleted requirement that vapors emitted from roofing 
kettles be incinerated, filtered, or processed.
     Added requirement that roofing kettles be equipped with 
close fitting lids.
     Added temperature limits for material in kettles.
     Added procedures for roofing kettle draining operations.
     Added requirement for kettle vents.
     Specified method to determine compliance with the 
temperature limits.
    VCAPCD Rule 74.28, Asphalt Roofing Operations, is a new rule that 
requires the following:
     Close fitting lids for roofing kettles.
     Temperature limits for material in kettles.
     Procedures for roofing kettle draining operations.
    VCAPCD Rule 74.21, Semiconductor Manufacturing, is a new rule that 
requires the following:
     Freeboard ratio for solvent cleaning station reservoirs 
and sinks.
     The use of low VOC solvents outside solvent cleaning 
stations.
     Solvent cleaning methods.
     Two-year recordkeeping.
    VCAPCD Rule 71.5, Glycol Dehydrators, is a new rule that requires 
the following:
     The use of VOC control system on glycol regenerator vents.
     Two-year recordkeeping.
     Glycol dehydrator vent and vapor disposal system testing 
methods.
    VCAPCD Rule 71, Crude Oil and Reactive Organic Compound Liquids, 
was revised to include new definitions needed to enforce Rule 71.5.
    EPA has evaluated the submitted rules and has determined that they 
are consistent with the CAA, EPA regulations, and EPA policy. 
Therefore, MDAQMD Rule 471, Asphalt Roofing Operations; VCAPCD Rule 
74.28, Asphalt Roofing Operations; VCAPCD Rule 74.21, Semiconductor 
Manufacturing; VCAPCD Rule 71.5, Glycol Dehydrators; and VCAPCD Rule 
71, Crude Oil and Reactive Organic Compound Liquids, are being approved 
under section 110(k)(3) of the CAA as meeting the requirements of 
section 110(a) and part D.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future implementation 
plan. Each request for revision to the state implementation plan shall 
be considered separately in light of specific technical, economic, and 
environmental factors and in relation to relevant statutory and 
regulatory requirements.
    EPA is publishing this document without prior proposal because the 
Agency views this as a noncontroversial amendment and anticipates no 
adverse comments. However, in a separate document in this Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed. This action will be 
effective April 29, 1996, unless, by April 1, 1996, adverse or critical 
comments are received.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent document that will 
withdraw the final action. All public comments received will then be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time. If no such comments are received, the public is 
advised that this action will be effective April 29, 1996.

Regulatory Process

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. Secs. 603 and 
604. Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises and 
government entities with jurisdiction over a population of less than 
50,000.
    SIP approvals under sections 110 and 301(a) and subchapter I, Part 
D of the CAA do not create any new requirements, but simply approve 
requirements that the State is already imposing. Therefore, because the 
Federal SIP-approval does not impose any new requirements, I certify 
that it does not have a significant impact on any small entities 
affected. Moreover, due to the nature of the Federal-state relationship 
under the CAA, preparation of a regulatory flexibility analysis would 
constitute Federal inquiry into the economic reasonableness of state 
action. The CAA forbids EPA to base its actions concerning SIPs on such 
grounds. Union Electric Co. v. U.S. EPA, 427 U.S. 246, 256-66 (S. Ct. 
1976); 42 U.S.C. 7410 (a)(2).

Unfunded Mandates

    Under Sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector or to 
State, local, or tribal governments in the aggregate.
    Through submission of this state implementation plan or plan 
revision, the State and any affected local or tribal governments have 
elected to adopt the program provided for under Part D of the Clean Air 
Act. These rules may bind State, local, and tribal governments to 
perform certain actions and also require the private sector to perform 
certain duties. The rules being approved by this action will impose no 
new requirements because affected sources are already subject to these 
regulations under State law. Therefore, no additional costs to State, 
local, or tribal governments or to the private sector result from this 
action. EPA has also determined that this final action does not include 
a mandate that may result in estimated costs of $100 million or more to 
State, local, or tribal governments in the aggregate or to the private 
sector.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, 

[[Page 7709]]
Assistant Administrator for Air and Radiation. The Office of Management 
and Budget (OMB) has exempted this regulatory action from Executive 
Order 12866 review.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Hydrocarbons, 
Incorporation by reference, Intergovernmental relations, Ozone, 
Reporting and recordkeeping requirements, Volatile organic compounds.

    Note: Incorporation by reference of the State Implementation 
Plan for the State of California was approved by the Director of the 
Federal Register on July 1, 1982.

    Dated: January 30, 1996.
Felicia Marcus,
Regional Administrator.

    Subpart F of part 52, chapter I, title 40 of the Code of Federal 
Regulations is amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart F--California

    2. Section 52.220(c) is amended by adding paragraphs 
(194)(i)(A)(4), (198)(i)(J), (210)(i)(C)(2), and (215)(i)(B)(2) to read 
as follows:

Sec. 52.220  Identification of plan.

* * * * *
    (c) * * *
    (194) * * *
    (i) * * *
    (A) * * *
    (4) Rule 74.21, adopted on April 6, 1993.
* * * * *
    (198) * * *
    (i) * * *
    (J) Ventura County Air Pollution Control District.
    (1) Rule 74.28, adopted on May 10, 1994.
* * * * *
    (210) * * *
    (i) * * *
    (C) * * *
    (2) Rule 471, adopted on December 21, 1994.
* * * * *
    (215) * * *
    (i) * * *
    (B) * * *
    (2) Rule 71 and Rule 71.5, adopted on December 13, 1994.
* * * * *
[FR Doc. 96-4570 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-W

Complete official Federal Register PDF

FR Doc. 96-4567 Approval of Discontinuation of Tail Pipe Lead and Fuel Inlet Test for Vehicle Antitampering Program for Oklahoma
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7709-7711]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4567]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[OK-11-1-6604a; FRL-5430-3]

Approval of Discontinuation of Tail Pipe Lead and Fuel Inlet Test 
for Vehicle Antitampering Program for Oklahoma

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: The EPA is approving the State Implementation Plan (SIP) 
revision submitted by the State of Oklahoma for the purpose of 
discontinuing the State's tail pipe lead and fuel inlet test in its 
vehicle antitampering program. The SIP revision also includes minor 
administrative changes related to the Oklahoma antitampering program. 
The SIP revision was submitted by the State in response to the dramatic 
diminished availability of leaded fuel which has resulted in a lack of 
a need for these tests, not only in Oklahoma but also nationwide. The 
rationale for the approval is set forth in this document; additional 
information is available at the address indicated in the ADDRESSES 
section.

DATES: This final rule will become effective on April 29, 1996 unless 
adverse or critical comments are received by April 1, 1996. If the 
effective date is delayed, timely notice will be published in the 
Federal Register.

ADDRESSES: Written comments on this action should be addressed to Mr. 
Thomas Diggs, Chief (6PD-L), Air Planning Section, at the EPA Regional 
Office listed below. Copies of the documents relevant to this action 
are available for public inspection during normal business hours at the 
following locations. Interested persons wanting to examine these 
documents should make an appointment with the appropriate office at 
least 24 hours before the visiting day.

U.S. Environmental Protection Agency, Region 6, Multimedia Planning & 
Permitting Division (6PD-L), 1445 Ross Avenue, Suite 700, Dallas, Texas 
75202-2733.
Air and Radiation Docket and Information Center, U.S. Environmental 
Protection Agency, 401 M Street SW., Washington, DC 20460.
Oklahoma Department of Environmental Quality, Air Quality Program, 4545 
North Lincoln Blvd., Suite 250, Oklahoma City, Oklahoma 73105-3483.

FOR FURTHER INFORMATION CONTACT: Mr. James F. Davis, Air Planning 
Section (6PD-L), Multimedia Planning & Permitting Division, U.S. 
Environmental Protection Agency, Region 6, 1445 Ross Avenue, Dallas, 
Texas 75202-2733, Telephone (214) 665-7584.

SUPPLEMENTARY INFORMATION:

I. Background

    The SIP revision, discussed in more detail in the Technical Support 
Document, dated May 24, 1995, is briefly outlined below.
    On May 16, 1994, the State of Oklahoma submitted to the U.S. 
Environmental Protection Agency (EPA) rules for Oklahoma SIP revisions 
allowing for the exclusions of the Plumbtesmo Lead Detection Test (LDT) 
and Fuel Inlet Restrictor (FIR) from the State Department of Public 
Safety's motor vehicle antitampering inspection procedures for Oklahoma 
City and Tulsa. In addition to the State regulations, Oklahoma 
submitted a summary and justification documenting the basis for this 
SIP revision.
    In the mid-1980s, EPA established test procedures and emission 
reduction credits for inspecting and requiring replacement of the 
catalytic converter when a tailpipe lead test revealed lead deposits in 
the tail pipe, or when the fuel inlet restrictor was found to be 
widened to permit refueling with a leaded nozzle. Since the mid-1980s, 
the availability of leaded fuel and the lead content in the fuel has 
diminished dramatically. In addition, leaded gasoline has been banned 
by the Clean Air Act Amendments of 1990 as of December 31, 1995, 
(Sec. 211(n)).

II. Analysis

A. Procedural Background

    The following criteria used to review the submitted SIP revision 
confirm that the State has demonstrated that the LDT and FIR check is 
no longer needed in Oklahoma: (1) proof that leaded gasoline is no 
longer generally available in the Emission Control Areas (ECA) of Tulsa 
and Oklahoma City, (2) verification that the local fleet has undergone 
more than one full inspection cycle with virtually no failures and, (3) 
completion of a State survey coordinated with EPA to determine that the 
fleet has failed the lead detection test less than 1 percent of the 
time. This Oklahoma SIP revision meets the criteria necessary for EPA 
to approve the SIP revision request.
    The State's SIP indicates that at the time of the State's Air 
Quality Council hearing, leaded fuel comprised less than 5 percent of 
the total fuel sales in Oklahoma, and where it was available it 

[[Page 7710]]
was more expensive, thus removing an incentive to misfuel. The State 
also cited a survey conducted in Tulsa in which only 26 of 269 service 
stations sold leaded gasoline. In addition, the SIP cites figures from 
the U.S. Department of Energy that show that leaded gasoline comprised 
about 1 percent of total sales.
    The vehicle antitampering program in Oklahoma City has been in 
place since 1978 to help control carbon monoxide and ozone pollution, 
and the program in Tulsa has been in place since 1986 to help control 
ozone pollution. The data submitted by the State showed that the 
numbers of vehicles failing LDT and FIR are below limits that make the 
benefit of the tests worthwhile. In 1992, the failure rate for the FIR 
was less than .06 percent while the failure rate for the LDT was less 
than .02 percent. In addition, to confirm these statistics the State 
conducted a survey of over 1,000 vehicles in Tulsa and Oklahoma County 
and found that no vehicles subject to the antitampering inspection 
failed the Plumbtesmo LDT.
    Also, EPA's Office of Mobile Sources recently issued a guidance 
memorandum dated September 16, 1994, entitled, ``Discontinuation of 
Tail Pipe Lead and Fuel Inlet Tests,'' which essentially allows the 
discontinuation of these tests without a State-submitted demonstration 
that these tests are no longer necessary. One condition of 
discontinuation stated in this policy to retain full credit is that the 
State has performed the tests for at least one test cycle and has 
required catalyst replacement upon failure. Oklahoma City and Tulsa 
meet these criteria as well as those discussed above. The EPA has 
reviewed the Oklahoma SIP revision submitted to the EPA, using the 
criteria stated above. The Oklahoma regulations represent an acceptable 
approach to the State's vehicle antitampering program.

III. Final Action

    In this action, the EPA is approving the SIP revision submitted by 
the State of Oklahoma for removing the Plumbtesmo LDT and FIR test from 
its vehicle antitampering program.
    Copies of the State's SIP revision and the Technical Support 
Document (TSD), detailing EPA's review of the SIP revision, are 
available at the address listed in the ADDRESSES section above. For a 
more detailed analysis of the SIP revision, the reader is referred to 
the TSD.
    The EPA is publishing this action without prior proposal because 
the Agency views this as a noncontroversial revision and anticipates no 
adverse comments. However, in a separate document in this Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed. Thus, today's direct 
final action will be effective April 29, 1996 unless, by April 1, 1996, 
adverse or critical comments are received.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent document that will 
withdraw the final action. All public comments received will then be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time. If no such comments are received, the public is 
advised that this action will be effective April 29, 1996.
    Nothing in this action should be construed as permitting, allowing 
or establishing a precedent for any future request for revision to any 
SIP. Each request for revision to a SIP shall be considered separately 
in light of specific technical, economic, and environmental factors and 
in relation to relevant statutory and regulatory requirements.
    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq, the EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities (5 U.S.C. 603 and 604). 
Alternatively, the EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations that are 
less than 50,000.
    The SIP revision approvals under section 110 and subchapter I, part 
D, of the Act do not create any new requirements, but simply approve 
requirements that the State is already imposing. Therefore, because the 
Federal SIP approval does not impose any new requirements, the EPA 
certifies that this proposed rule would not have a significant impact 
on any small entities affected. Moreover, due to the nature of the 
Federal-State relationship under the Act, preparation of a regulatory 
flexibility analysis would constitute Federal inquiry into the economic 
reasonableness of State actions. The Act forbids the EPA to base its 
actions concerning SIP's on such grounds. Union Electric Co. v. 
U.S.E.P.A., 427 U.S. 246, 256-266 (S. Ct. 1976); 42 U.S.C. section 
7410(a)(2).
    Under section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, the EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under section 205, the EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires the EPA to establish a 
plan for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    The EPA has determined that the approval action promulgated today 
does not include a Federal mandate that may result in estimated costs 
of $100 million or more to either State, local, or tribal governments 
in the aggregate, or to the private sector. This Federal action 
approves preexisting requirements under State or local law, and imposes 
no new Federal requirements. Accordingly, no additional costs to State, 
local, or tribal governments, or to the private sector, result from 
this action.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995, memorandum from Mary Nichols, Assistant Administrator 
for Air and Radiation. The Office of Management and Budget has exempted 
this regulatory action from Executive Order 12866 review.
    Under section 307(b)(1) of the Act, 42 U.S.C. 7607(b), petitions 
for judicial review of this action must be filed in the United States 
Court of Appeals for the appropriate circuit by April 29, 1996. Filing 
a petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review may be filed, and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements (See section 307(b)(2)).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Incorporation by reference, Nitrogen dioxide, Reporting 
and recordkeeping requirements, Volatile organic compounds.

[[Page 7711]]

    Note: Incorporation by reference of the SIP for the State of 
Oklahoma was approved by the Director of the Federal Register on 
July 1, 1982.

    Dated: January 12, 1996.
A. Stanley Meiburg,
Acting Regional Administrator (6A).
    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart LL--Oklahoma

    2. Section 52.1920 is amended by adding paragraph (c)(46) to read 
as follows:

Sec. 52.1920  Identification of plan.

* * * * *
    (c) * * *
    (46) A revision to the Oklahoma SIP to include revisions to 
Oklahoma Department of Public Safety regulation Title 595, Chapter 20, 
Subchapter 3--Emission and Mechanical Inspection of Vehicles, 
Subchapter 7--Inspection Stickers and Monthly Tab Inserts for 
Windshield and Trailer/Motorcycle, Subchapter 9--Class AE Inspection 
Station, Vehicle Emission Anti-tampering Inspection and Subchapter 11--
Annual Motor Vehicle Inspection and Emission Anti-Tampering Inspection 
Records and Reports, adopted by the State on April 6, 1994, effective 
May 26, 1994 and submitted by the Governor on May 16, 1994.
    (i) Incorporation by reference.
    (A) Revisions to Oklahoma Department of Public Safety regulation 
Title 595, Chapter 20: 3-1(2); 3-3; 3-5; 3-6; 3-12; 3-25; 3-26; 3-27; 
3-41(o); 3-42; 3-46(a) and (b); 3-61(a),(b),(e) and (f); 3-63(b) and 
(g); 7-1(c) and (f); 7-2(a); 7-3; 7-4(a); 7-5(a); 7-6(a); 7-7(a); 9-
1(a); 9-3(l) and (m); 9-7; 9-10(a),(b) and (c); 9-11(a); 9-12(a); 9-
13(a); 9-14(a) and (b); 9-15(a); 11-1; 11-2(a); 11-3(a); 11-4 effective 
May 26, 1994.
    (ii) Additional material.
    (A) State SIP revision entitled, ``Oklahoma Vehicle Anti-Tampering 
Program SIP Revision,'' which includes a completeness determination, 
SIP narrative, hearing records and other documentation relevant to the 
development of this SIP.

[FR Doc. 96-4567 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-4566 Approval and Promulgation of Implementation Plans; State of Missouri
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7714-7716]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4566]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[OAQPS 6542; FRL-5426-8]

Approval and Promulgation of Implementation Plans; State of 
Missouri

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The purpose of this revision to the Missouri State 
Implementation Plan (SIP) is to revise the Missouri Part D new source 
review (NSR) rules, update and add numerous definitions, revise the 
maximum allowable increase for particulate matter under the 
requirements for prevention of significant deterioration (PSD) of air 
quality, address emission statements under Title I of the Clean Air Act 
Amendments (CAAA), and generally enhance the SIP.
    The objective of this final rule is to approve into the Missouri 
SIP rules adopted by the state which meet the requirements of the Clean 
Air Act (CAA) as amended in 1990 with regard to NSR in areas that have 
not attained the national ambient air quality standard. This 
implementation plan revision was submitted by the state pursuant to 
Federal requirements for an approvable NSR SIP for Missouri.

EFFECTIVE DATE: This rule will be effective on April 1, 1996.

ADDRESSES: Copies of the documents relevant to this action are 
available for public inspection during normal business hours at the EPA 
Air, RCRA, and Toxics Division, 726 Minnesota Avenue, Kansas City, 
Kansas 66101; and at the EPA Air and Radiation docket and Information 
Center, 401 M Street, S.W., Washington, DC 20460.

FOR FURTHER INFORMATION CONTACT: Josh Tapp at (913) 551-7606.

SUPPLEMENTARY INFORMATION:

I. Background

    On April 3, 1995, at 60 FR 16824 the EPA proposed to approve the 
SIP revision by the state of Missouri that revises the Missouri Part D 
NSR rules, updates and adds numerous definitions, revises the maximum 
allowable increase for particulate matter under the requirements for 
PSD of air quality, addresses emission statements under Title I of the 
CAAA, and generally enhances the SIP.
    The Federal Register proposal provided that the final rule was 
contingent upon Missouri modifying the language in its definition of 
the term ``construction'' to prohibit major sources from commencing 
construction before a permit had been issued. The proposal also 
required the construction permit rule be modified to prohibit the 
taking of offset credits for emission reductions required under either 
Federal law or a Federally enforceable permit.
    The EPA is currently developing a proposed rule to assist the 
implementation of the changes under the amended Act in the NSR 
provisions in Parts C and D of Title I of the Act. EPA will refer to 
the proposed rule as the most authoritative guidance available 
regarding the approvability of submittals. Upon promulgation of the 
final regulations, EPA will review the NSR SIPs of all states to 
determine whether additional SIP revisions are necessary.

II. Construction Permits Required--10 CSR 10-6.060

A. General Nonattainment NSR Nonattainment Permit Requirements

    In the April 3, 1995, proposal to approve the SIP revision by the 
state of Missouri that revises the Missouri Part D NSR rules, 11 CAA 
requirements were addressed in detail. These requirements consist of 
the following and are discussed at 60 FR 16825-6: (1) Offset ratios, 
(2) geographical location of offsets, (3) timing of offsets, (4) actual 
emissions reductions, (5) NOX requirements, (6) creditable 
reductions, (7) prohibition on old growth allowances, (8) analysis of 
alternatives, (9) reasonable further progress, (10) reasonably 
available control technology/best available control technology/lowest 
achievable emission rate clearinghouse information, and (11) stationary 
source definition. Each of these requirements has been thoroughly 
addressed in the proposal and the reader is referred to that document 
for further discussion. Missouri has satisfied each of these Federal 
requirements. 

[[Page 7715]]

B. Missouri Construction Permit Program Corrections

1. Particulate Matter
    After the December 1993 rule adoption by the Missouri Air 
Conservation Commission (MACC), the Class I variance table found at 10 
CSR 10-6.060(12)(H)2 did not reflect the revised PM10 numerical 
maximum allowable increases as set forth at 40 FR Sec. 51.166(p)(4). In 
the April 3, 1995, proposal, EPA identified this omission as a 
correction to be made prior to EPA's final action to approve the rule. 
With the March 30, 1995, MACC rule adoption, the table at 10 CSR 10-
6.060(12)(H)2 now includes PM10 as a pollutant with numerical 
values at least as stringent as those found at 40 CFR 
Sec. 51.166(p)(4). Missouri's rule now satisfies the PM10 
requirement.
2. Waiver Policy
    Before the March 30, 1995, MACC rule adoption, the Missouri 
Construction Permits Required rule, 10 CSR 10-6.060, in conjunction 
with the definition of ``construction'' at 10 CSR 10-6.020(2)(C)22, 
could be interpreted as allowing major sources to commence construction 
without a permit in contravention of CAA and EPA regulations. That 
definition of ``construction'' allowed for synthetic minor sources, 
those that are major in reality but which seek Federally enforceable 
limitations to limit their potential to emit, to submit a waiver 
request to the Missouri Department of Natural Resources (MDNR) allowing 
the source to commence limited and specified construction activities. 
In the April 3, 1995, proposal, EPA stated that the waiver provision 
must be omitted before the rule could be approved. The recently adopted 
definition of ``construction'' at 10 CSR 10-6.020(2)(C)22 deletes the 
reference to authorization to construct if the applicant submits a 
signed waiver. This current definition of ``construction'' is 
approvable into the SIP.
3. Offset Credits
    At the time the proposed rulemaking (60 FR 16824, April 3, 1995) 
was published in the Federal Register, the Missouri construction rule, 
10 CSR 10-6.060, lacked a prohibition on taking offset credits for 
emission reductions which are required by Federal law or a Federally 
enforceable permit. The proposal identified this omission as a change 
to be made before EPA could approve the rule. The language at 10 CSR 
10-6.060(12)(C)4 has been modified by Missouri to include that 
prohibition. As regards offset credits, the Missouri rule now satisfies 
this requirement and is approvable into the SIP.

C. Commenced Construction

    Under the applicablity provisions of 10 CSR 10-6.060(1)(C), no 
owner or operator shall commence construction or modification of any 
installation subject to the construction permits rule, unless it meets 
certain threshold requirements set forth in the rule and it first 
obtains a permit. The Missouri rules define ``commenced'' at 10 CSR 10-
6.020(C)15 as ``an owner or operator has undertaken a continuous 
program of construction or modification or that an owner or operator 
has entered into a binding agreement or contractual obligation to 
undertake and complete within a reasonable time, a continuous program 
of construction or modification.'' When these two provisions are read 
together, the rules appear to prohibit a source from entering into a 
contractual relationship pertaining to construction before obtaining a 
permit. Since the Missouri provisions are at least as stringent as 
Federal law at 40 CFR Sec. 51.166(i)(1), they are approvable into the 
SIP.

III. Update to Definitions Found in 10 CSR 10-6.020

    There are many definitions which are being revised within or added 
to the SIP. Many of these definitions pertain to the Title V and 
asbestos programs. These definitions are being approved into the SIP 
because they provide overall consistency in the use of terms in the air 
program. Because many of these terms do pertain to Title V, it is 
important to recognize that EPA approval into the SIP of these 
definitions does not constitute approval with respect to the Title V 
submission. This approval of the definitions is only for purposes of 
the SIP in the context of the requirements of section 110 of the Act, 
and other provisions of the Act referenced in section 110. The reader 
is referred to the technical support document for clarification on 
changes to definitions and additions to the list of definitions.

IV. Confidential Information--10 CSR 10-6.210

    The information set forth in the April 3, 1995, proposed rule (60 
FR 16827) describes this rule and explains EPA's rationale for approval 
of the rule.

V. Emission Statement Rule--10 CSR 10-6.110

    The information set forth in the April 3, 1995, proposed rule (60 
FR 16827) describes this rule and explains EPA's rationale for approval 
of the rule.

EPA Action

    In this document, EPA takes final action on the rulemaking to 
provide clarification on offset requirements; provide for the treatment 
of economic development zones; and require that the relative benefits 
of alternative sites, production processes, and control steps must be 
considered prior to approval of a new source permit. In addition, the 
rulemaking addresses corrections to Missouri's definition rule; 
confidential information rule; and the rule pertaining to the 
submission of emission data, fees, and process information.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any SIP. Each request for revision to the SIP shall be 
considered separately in light of specific technical, economic, and 
environmental factors, and in relation to relevant statutory and 
regulatory requirements.
    SIP approvals under section 110 and subchapter I, Part D of the CAA 
do not create any new requirements, but simply approve requirements 
that the state is already imposing. Therefore, because the Federal SIP 
approval does not impose any new requirements, EPA certifies that it 
does not have a significant impact on any small entities affected. 
Moreover, due to the nature of the Federal-state relationship under the 
CAA, preparation of a regulatory flexibility analysis would constitute 
Federal inquiry into the economic reasonableness of state action. The 
CAA forbids EPA to base its actions concerning SIPs on such grounds 
(Union Electric Co. v. U.S. E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 
42 U.S.C. 7410(a)(2)).
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995, memorandum from Mary Nichols, Assistant Administrator 
for Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from E.O. 12866 review.
    Under sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector, or to 
state, local, or tribal governments in the 

[[Page 7716]]
aggregate. The Missouri revisions have no impact on tribal governments.
    Through submission of this plan revision, the state has elected to 
adopt the program provided for under section 110 of the CAA. These 
rules may bind state and local governments to perform certain actions 
and also require the private sector to perform certain duties. To the 
extent that the rules being finalized for approval by this action will 
impose new requirements, sources are already subject to these 
regulations under state law. Accordingly, no additional costs to state 
or local governments, or to the private sector, result from this final 
action. EPA has also determined that this final action does not include 
a mandate that may result in estimated costs of $100 million or more to 
state or local governments in the aggregate or to the private sector.
    Under section 307(b)(1) of the CAA, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by April 29, 1996. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this rule for the purposes of judicial review, nor does 
it extend the time within which a petition for judicial review may be 
filed, and shall not postpone the effectiveness of such rule or action. 
This action may not be challenged later in proceedings to enforce its 
requirements. (See section 307(b)(2).)
    The OMB has exempted these actions from review under Executive 
Order 12866.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Incorporation by reference, Intergovernmental relations, 
Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and 
recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

    Dated: December 6, 1995.
Dennis Grams,
Regional Administrator.
    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart AA--[Missouri]

    2. Section 52.1320 is amended by adding paragraph (c)(86) to read 
as follows:

Sec. 52.1320  Identification of plan.

* * * * *
    (c) * * *
    (86) A revision to the Missouri SIP to revise the Missouri part D 
NSR rules, update and add numerous definitions, revise the maximum 
allowable increase for particulate matter under the requirements for 
PSD of air quality, address emission statements under Title I of the 
CAA, and generally enhance the SIP.
    (i) Incorporation by reference.
    (A) Revision to rules 10 CSR 10-6.020, Definitions and Common 
Reference Tables, effective August 30, 1995; 10 CSR 10-6.060, 
Construction Permits Required, effective August 30, 1995; 10 CSR 10-
6.110, Submission of Emission Data, Emission Fees, and Process 
Information, effective May 9, 1994; and 10 CSR 10-6.210, Confidential 
Information, effective May 9, 1994.
    (ii) Additional material. None.
* * * * *
[FR Doc. 96-4566 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-4565 Approval and Promulgation of Implementation Plans; State of Missouri
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7711-7714]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4565]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[MO-29-1-7151a; FRL-5425-2]

Approval and Promulgation of Implementation Plans; State of 
Missouri

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: This document takes final action to approve the State 
Implementation Plans (SIP) submitted by the state of Missouri for the 
purpose of fulfilling the requirements set forth in EPA's 
Transportation Conformity rule. The SIPs were submitted by the state to 
satisfy the Federal requirements in 40 CFR 51.396.

DATES: This action is effective April 29, 1996 unless by April 1, 1996 
adverse or critical comments are received.

ADDRESSES: Copies of the documents relevant to this action are 
available for public inspection during normal business hours at the: 
Environmental Protection Agency, Air Branch, 726 Minnesota Avenue, 
Kansas City, Kansas 66101; and EPA Air & Radiation Docket and 
Information Center, 401 M Street, SW., Washington, DC 20460.

FOR FURTHER INFORMATION CONTACT: Lisa V. Haugen at (913) 551-7877.

SUPPLEMENTARY INFORMATION:

I. Background

    Section 176(c)(4) of the Clean Air Act, as amended (CAA), requires 
the EPA to promulgate criteria and procedures for demonstrating and 
ensuring conformity of Federal actions to an applicable implementation 
plan developed pursuant to section 110 and part D of the CAA. 
Conformity to an implementation plan is defined by the CAA as 
conformity to an implementation plan's purpose of eliminating or 
reducing the severity and number of violations of the National Ambient 
Air Quality Standards, and achieving expeditious attainment of such 
standards. On November 23, 1993, the EPA promulgated the final rule 
(hereafter referred to as the Transportation Conformity rule), which 
established the process by which the Federal Highway Administration 
(FHWA), the Federal Transit Administration (FTA), and metropolitan 
planning organizations (MPO) determine conformity of highway and 
transit projects.
    The Transportation Conformity rule also establishes the criteria 
for EPA approval of SIPs. See 40 CFR Sec. 51.396. These criteria 
provide that the state provisions must be at least as stringent as the 
requirements specified in EPA's Transportation Conformity rule, and 
that they can be more stringent only if they apply equally to 
nonfederally funded transportation projects as well as those using 
Federal funds (section 51.396(a)).
    The St. Louis area was designated nonattainment for ozone and 
carbon monoxide (CO) in 1978. On November 6, 1991, EPA promulgated a 
rule which classified the St. Louis area as a moderate ozone 
nonattainment area, and as an unclassified nonattainment area for CO. 
Kansas City was redesignated to attainment for ozone, and a maintenance 
plan was approved, in a June 23, 1992, Federal Register notice. Section 
51.396 of the Transportation Conformity rule requires that states with 
areas subject to the rule submit an SIP revision containing the 
criteria and procedures for FHWA, FTA, MPOs, and other state or local 
agencies to assess the conformity of transportation plans, 
Transportation Improvement Programs (TIP), and projects to the 
applicable SIP, within 12 months after November 23, 1993. As the rule 
applies to all ozone and CO nonattainment and maintenance areas, SIP 
revisions for the St. Louis and Kansas City areas, addressing the 
requirements of the Transportation Conformity rule, became due on 
November 24, 1994.

II. Review of State Submittal

    On February 14, 1995, the state of Missouri submitted 
Transportation Conformity SIP revisions for Kansas City and St. Louis. 
The submission included an SIP revision for Kansas City along with 
Missouri rule 10 CSR 10-2.390 (10-2.390), and an SIP revision, 
including Missouri rule 10 CSR 10-5.480 (10-5.480), which applies to 
St. Louis. Section 51.396 requires that, for the SIP revision to be 
approvable by EPA, certain sections of the Transportation Conformity 
rule be incorporated verbatim.
    The state of Missouri chose to use the model Transportation 
Conformity rule developed by the State and Territorial Air Pollution 
Program Administrators (STAPPA)/Association of Local Air Pollution 
Control Officials (ALAPCO). The STAPPA/ALAPCO model rule added 
clarifying changes consistent with the intent of the Federal rule. For 
instance, 10-5.480(10)(B) and 10-2.390(10)(B) include examples of the 
types of planning assumptions which must be considered in making 
conformity determinations. The examples are added to the language in 
section 51.412 of the Federal rule, but do not change the section's 
intent. The 

[[Page 7712]]
STAPPA/ALAPCO rule also contains ``more stringent'' and ``lateral'' 
options which change the substance of the Federal rule. Provisions in 
the STAPPA/ALAPCO rule which are more stringent than the Federal rule 
are identified as ``Optional More Stringent Version,'' ``Optional More 
Stringent Additional Provision,'' or ``Optional More Stringent and 
Potentially Discriminatory Versions.'' Options which address subjects 
not covered by the Federal Conformity rule, or which expand the 
coverage of the Federal rule's requirements, are identified as 
``Lateral Expansion Option'' in the STAPPA/ALAPCO rule. Missouri did 
not adopt any of these options from the model rule. Therefore, except 
as noted below, EPA finds that the Missouri submissions meet the 
criteria set forth in section 51.396 of the Transportation Conformity 
rule.
    On February 8, 1995, EPA published an interim final rule entitled, 
``Transportation Conformity Rule Amendments: Transition to the Control 
Strategy Period.'' This interim final rule, which modified the language 
in sections 51.448 and 93.128 of the Federal rule, was effective 
immediately and applied until August 8, 1995. A proposed rule for these 
language modifications was also published February 8, 1995, and a final 
rule was published on August 7, 1995. Missouri rules 10 CSR 10-
5.480(22) and 10-2.390(20) reflect the Federal rule requirements before 
the publication of the interim final rule. Specifically, the Missouri 
rule provides that conformity will lapse 12 months from the date of an 
EPA finding of specific SIP deficiencies. Therefore, EPA is approving 
the state's Transportation Conformity SIP revisions with the exception 
of the aforementioned portions of the Missouri rules. Section 93.128 of 
the Federal Transportation Conformity rule, as amended on August 7, 
1995, will remain in effect until the state of Missouri submits an SIP 
revision which incorporates the changes in the Federal rule. Section 
93.128, as amended, states that a conformity lapse resulting from a 
finding of certain SIP deficiencies is delayed until CAA section 179(b) 
highway sanctions for these deficiencies are applied.
    On August 29, 1995, EPA published an interim final rulemaking 
amending the November 24, 1993, final Transportation Conformity rule to 
remove the statutory reference relating to exempting certain areas from 
certain NOX provisions of the Transportation Conformity rule. 
Specifically, the interim final rule removed the reference to NOX 
waivers under Sec. 182(f) to ensure that the waivers had to be approved 
as part of the implementation plan revision process discussed in 
Sec. 182(b) of the CAA, in order to exempt areas from the requirement 
to make conformity determinations for NOX. Missouri rules 10 CSR 
10-2.390 and 10 CSR 10-5.480 specifically reference waivers approved 
under Sec. 182(f) as the statutory authority which would relieve areas 
from the NOX conformity requirements. In a letter dated December 
7, 1995, from David Shorr, Director, Missouri Department of Natural 
Resources to Dennis Grams, Regional Administrator, EPA, the state of 
Missouri confirms its understanding that, should EPA approve an 
NOX waiver under Sec. 182(f), this waiver does not relieve the 
state from the NOX conformity requirements in the Transportation 
Conformity rule. The letter further states that Missouri intends to 
implement its rule in a manner consistent with EPA's interim final 
rule, so that the conformity requirements will continue to apply until 
any NOX waiver request has undergone a public hearing, has been 
submitted to EPA, and has been subsequently approved as an SIP 
revision.
    On November 14, 1995, the EPA promulgated a final rule which 
amended certain provisions of the Federal Transportation Conformity 
rule. These changes include allowing any transportation control measure 
from an approved SIP to proceed during a conformity lapse; aligning the 
date of conformity lapses with the date of application of the CAA 
highway sanctions for any failure to submit or submission of an 
incomplete control strategy SIP; extension of the grace period before 
which areas must determine conformity to a submitted control strategy 
SIP; establishment of a grace period before which transportation plan 
and program conformity must be determined in newly designated 
nonattainment areas; and a correction of the nitrogen oxides provisions 
of the Transportation Conformity rule so they are consistent with the 
CAA and previous commitments made by EPA. As the state adopted and 
submitted its Transportation Conformity rules prior to the publication 
of the November 14, 1995, rule amendments, and a Transportation 
Conformity SIP revision consistent with these amendments must be 
submitted to EPA by 12 months from November 14, 1995, EPA believes it 
is reasonable to approve the state's submittal. EPA expects Missouri to 
amend its conformity rules consistent with the November 1995 rule 
amendments and submit the amendments to EPA for approval by November 
1996.
    The Missouri SIP revisions, including 10-2.390 and 10-5.480, were 
adopted by the Missouri Air Conservation Commission, after proper 
notice and public hearing, on January 12, 1995, and became effective on 
May 28, 1995. These rules apply in all nonattainment and maintenance 
areas for transportation-related criteria pollutants for which the area 
is designated nonattainment, or has a maintenance plan as required by 
sections 51.394 and 93.102 of the Transportation Conformity rule.
    Because the Missouri rules meet the substantive requirements of 
EPA's Transportation Conformity rule, EPA has determined that these 
submissions meet the requirements for an approvable Transportation 
Conformity SIP.

III. Specific Language Changes

    The Missouri Transportation Conformity rules include changes which 
clarify the text of the Federal rule, as explained below. Other changes 
reflect guidance issued by EPA in the Preamble of the final 
Transportation Conformity rule.
    A. The preamble to the November 1993 Transportation Conformity rule 
states that there must be consistency between the SIP and the 
conformity analysis regarding modeling parameters such as temperature, 
season, etc. This regulatory requirement is incorrectly stated only in 
sections 51.452(b)(5) and 93.130(b)(5), which apply to serious, severe, 
and extreme ozone nonattainment areas and serious carbon monoxide areas 
after January 1, 1995. In an October 14, 1994, EPA memorandum, it is 
indicated that it was EPA's intent for this requirement to apply to all 
areas. This memorandum also cited an incorrect reference in sections 
51.452(c)(1) and 93.130(c)(1) to paragraph (a) of the same section. The 
reference should have been to paragraph (b). The corrections are made 
in 10-2.390(24)(A)6., 10-2.390(24)(C)1., 10-5.480(26)(A)6., and 10-
5.480(26)(C)1. of the Missouri rules.
    B. Sections 51.458 and 93.133 require the Transportation Conformity 
SIP revisions to provide that written commitments to mitigation 
measures must be obtained prior to a positive conformity determination, 
and that project sponsors must comply with such commitments. The 
Missouri rules modify this language to make it appropriate for the 
state rules in 10-2.390(26)(C) and 10-5.480(29)(C).
    C. In part IV(L)(1) of the Preamble to the final Transportation 
Conformity 

[[Page 7713]]
rule, EPA stated that Transportation Conformity SIPs should specify 
what action by an affected recipient of funds designated under Title 23 
U.S.C. or the Federal Transit Act, constitutes adoption or approval of 
a nonfederal transportation project for inclusion in a regional 
emissions analysis. ``Adoption and approval'' are defined in 10-
2.390(5)(C)4.C. and 10-5.480(5)(C)3.D.
    D. Part IV(F)(1) of the Preamble to the final Transportation 
Conformity rule discusses the ``timely implementation'' of 
transportation control measures as being a criteria for a conformity 
determination. Specifically, EPA uses the term ``maximum priority.'' 
10-2.390(13)(C) and 10-5.480(13)(C) add language which clarifies the 
term ``maximum priority.''

IV. Consultation

    Section 51.402 (93.105) requires the state to include procedures 
for interagency consultation and resolution of conflicts in the 
Transportation Conformity SIPs. The SIPs are to provide ``well-defined 
consultation procedures whereby representatives of the MPOs, state and 
local air quality planning agencies, state and local transportation 
agencies * * * must consult with each other and with local or regional 
offices of EPA, FHWA, and FTA on the development of the implementation 
plan, the TIP, and associated conformity determinations.'' Both 10-
2.390(5) and 10-5.480(5) establish consultation procedures which meet 
EPA's consultation criteria.
    Both St. Louis and Kansas City are bistate areas. 10-2.390(5) and 
10-5.480(5) establish the consultation, conflict resolution and public 
participation procedures for conformity determinations, SIPs, 
transportation plans, and TIPs, and clearly state the agencies that 
will be involved in the consultation process in Kansas and Missouri for 
the Kansas City area, and in Illinois and Missouri for the St. Louis 
area. The roles and responsibilities of each agency are outlined in 
detail.
    The consultation process established in 10-2.390(5) and 10-5.480(5) 
incorporate the basic principle behind sections 51.402 and 93.105 in 
the Federal Transportation Conformity rule. Missouri has established a 
mechanism by which every agency with any responsibility for any key 
transportation or air quality decision must consult with every other 
agency with an interest in that decision. Each interested party is 
provided with all the necessary information needed for meaningful input 
and, prior to taking any action, the views of the party are considered 
and responded to in a substantive manner. The reader is referred to the 
Technical Support Document for information on specific processes within 
the interagency consultation procedures, including conflict resolution 
procedures and the public participation process. EPA has determined 
that sections 10-2.390(5) and 10-5.480(5) meet the requirements of 
52.402 and 93.105 of the Federal Transportation Conformity rule.
    EPA Action: The effect of this action is that EPA grants full 
approval of Missouri's February 14, 1995, submittals. These SIP 
revisions meet the requirements set forth in 40 CFR Sec. 51.396. As 
explained above, Missouri will be required to revise its rules 
consistent with revisions promulgated by EPA subsequent to Missouri's 
adoption of its rules.
    The EPA is publishing this action without prior proposal because 
the Agency views this as a noncontroversial amendment and anticipates 
no adverse comments. However, in a separate document in the Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent notice that will 
withdraw the final action. All public comments received will then be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any SIP. Each request for revision to the SIP shall be 
considered separately in light of specific technical, economic, and 
environmental factors, and in relation to relevant statutory and 
regulatory requirements.
    Under the Regulatory Flexibility Act, 5 U.S.C. Sec. 600 et seq., 
EPA must prepare a regulatory flexibility analysis assessing the impact 
of any proposed or final rule on small entities (5 U.S.C. Secs. 603 and 
604). Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    SIP approvals under section 110 and subchapter I, part D of the CAA 
do not create any new requirements, but simply approve requirements 
that the state is already imposing. Therefore, because the Federal SIP 
approval does not impose any new requirements, EPA certifies that it 
does not have a significant impact on any small entities affected. 
Moreover, due to the nature of the Federal-state relationship under the 
CAA, preparation of a regulatory flexibility analysis would constitute 
Federal inquiry into the economic reasonableness of state action. The 
CAA forbids EPA to base its actions concerning SIPs on such grounds 
(Union Electric Co. v. U.S. E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 
42 U.S.C. 7410(a)(2)).
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995, memorandum from Mary Nichols, Assistant Administrator 
for Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from E.O. 12866 review.

Unfunded Mandates

    Under sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector, or to 
state, local, or tribal governments in the aggregate.
    Through submission of this state implementation plan, the state has 
elected to adopt the program provided for under section 110 of the CAA. 
These rules may bind state and local governments to perform certain 
actions and also require the private sector to perform certain duties. 
To the extent that the rules being finalized for approval by this 
action will impose new requirements, sources are already subject to 
these regulations under state law. Accordingly, no additional costs to 
state or local governments, or to the private sector, result from this 
final action. EPA has also determined that this final action does not 
include a mandate that may result in estimated costs of $100 million or 
more to state or local governments in the aggregate or to the private 
sector. EPA has determined that these rules result in no additional 
costs to tribal government.
    Under section 307(b)(1) of the CAA, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by April 29, 1996. Filing a petition for 
reconsideration by the 

[[Page 7714]]
Administrator of this final rule does not affect the finality of this 
rule for the purposes of judicial review, nor does it extend the time 
within which a petition for judicial review may be filed, and shall not 
postpone the effectiveness of such rule or action. This action may not 
be challenged later in proceedings to enforce its requirements. (See 
section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Incorporation by reference, Intergovernmental relations, Ozone, 
Reporting and record keeping requirements, Volatile organic compounds.

    Dated: February 6, 1996.
Dennis Grams,
Regional Administrator.

    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart AA--Missouri

    2. Section 52.1320 is amended by adding paragraph (c)(92) to read 
as follows:

Sec. 52.1320  Identification of plan.

* * * * *
    (c) * * *
    (92) On February 14, 1995, the Missouri Department of Natural 
Resources submitted two new rules which pertain to transportation 
conformity in Kansas City and St. Louis.
    (i) Incorporation by reference.
    (A) New rule 10 CSR 10-2.390 (except section (20) Criteria and 
Procedures: Interim Period Reductions in Ozone Areas (TIP)) and 10 CSR 
10-5.480 (except section (22) Criteria and Procedures: Interim Period 
Reductions in Ozone Areas (TIP)), both entitled Conformity to State 
Implementation Plans of Transportation Plans, Programs, and Projects 
Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal 
Transit Act, effective May 28, 1995.
    (ii) Additional material.
    (A) Missouri's Air Pollution Control Plan, St. Louis Metropolitan 
Area Ozone and Carbon Monoxide Transportation Conformity, January 12, 
1995.
    (B) Missouri's Air Pollution Control Plan, Kansas City Metropolitan 
Area Ozone Transportation Conformity, January 12, 1995.
    (C) Policy agreement, entered into between the Missouri Department 
of Natural Resources, the Mid-America Regional Council, and the Highway 
and Transportation Commission of the state of Missouri, dated August 
31, 1993.
    (D) Letter from the state of Missouri to EPA, dated December 7, 
1995, in which the state commits to implementing its state rule 
consistent with the Federal Transportation Conformity rule, as amended 
on August 29, 1995, with regards to the granting of an NOx waiver 
and the NOx conformity requirements.

[FR Doc. 96-4565 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-4560 Amendment of Class E Airspace; Winnemucca, NV; Correction
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7697-7698]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4560]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-AWP-34]

Amendment of Class E Airspace; Winnemucca, NV; Correction

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This action corrects errors in the geographic coordinates of a 
final rule that was published in the Federal Register on January 10, 
1996, Airspace Docket No. 95-AWP-34, The Final Rule amended Class E 
airspace at Winnemucca, NV.

EFFECTIVE DATE: 0901 UTC February 29, 1996.

FOR FURTHER INFORMATION CONTACT: Scott Speer, Airspace Specialist, 
System Management Branch, AWP-530, Air Traffic Division, Western-
Pacific Region, Federal Aviation Administration, 15000 Aviation 
Boulevard, Lawndale, California 90261, telephone (310) 725-6533.

SUPPLEMENTARY INFORMATION: 

History

    Federal Register Document 96-377, Airspace Docket No. 95-AWP-34, 
published on January 10, 1996 (61 FR 693), revised the description of 
the Class E airspace area at Winnemucca, NV. An error was discovered in 
the geographic coordinates for the Winnemucca, NV, Class E airspace 
area. This action corrects that error.

Correction to Final Rule

    Accordingly, pursuant to the authority delegated to me, the 
geographic coordinates for the Class E airspace area at Winnemucca, NV, 
as published in the Federal Register on January 10, 1996 (61 FR 693), 
(Federal Register Document 96-377), are corrected as follows:

Sec. 71.1  [Corrected]

    On page 694, in the second and third columns, the airspace 
description for Winnemucca, NV, is corrected to read as follows:
* * * * *

AWP NV E5 Winnemucca, NV  [Corrected]

Winnemucca Municipal Airport, NV.
    (lat. 40 deg.53'47'' N, long. 117 deg.48'21'' W)
Winnemucca NDB
    (lat. 40 deg.57'48'' N, long. 117 deg.50'29'' W)
Battle Mountain VORTAC
    (lat. 40 deg.34'09'' N, long. 116 deg.55'20'' W)

    That airspace extending upward from 700 feet above the surface 
within a 4.3-mile radius of the Winnemucca Municipal Airport and 
within 7.8 miles northwest and 4.3 miles east of the Winnemucca NDB 
342 deg. and 162 deg. bearings, extended from the 4.3 miles south to 
8.7 miles north of the NDB. That airspace extending upward from 
1,200 feet above the surface within 4.3 miles northeast and 9.6 
miles southwest of the Winnemucca NDB 342 deg. and 162 deg. 
bearings, extending from the southeast edge of V-113 to 9.6 miles 
southeast of the NDB and within 4.3 miles each side of the 162 deg. 
bearing from the Winnemucca NDB, extending from 9.6 miles southeast 
of the NDB to the north edge of V-32 and within 4.3 miles each side 
of the Battle Mountain VORTAC 296 deg. radial extending from 10.4 
miles to 43.4 miles northwest of the Battle Mountain VORTAC and that 
airspace bounded by a line beginning at lat. 40 deg.33'00'' N, long. 
117 deg.52'00'' W; to lat. 40 deg.37'01'' N, long. 117 deg.47'32'' 
W; to lat. 40 deg.33'58'' N, long. 117 deg.46'15'' W, thence to the 
point of beginning and that airspace bounded by a line beginning at 
lat. 41 deg.05'00'' N, long. 118 deg.12'30'' W; to lat. 
41 deg.09'36'' N, long. 118 deg.08'50'' W; to lat. 41 deg.03'00'' N, 
long. 118 deg.06'00'' W, thence to the point of beginning and that 
airspace bounded by a line beginning at lat. 40 deg.45'38'' N, long. 
117 deg.39'23'' W; to lat. 40 deg.36'30'' N, long. 117 deg.15'15'' 
W; to lat. 40 deg.35'00'' N, long. 117 deg.34'30'' W, thence to the 
point of beginning.
* * * * *

[[Page 7698]]

    Issued in Los Angeles, California, on February 14, 1996.
Leonard A. Mobley,
Acting Manager, Air Traffic Division, Western-Pacific Region.
[FR Doc. 96-4560 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-4542 Regulatory Reinvention; Streamlining of Housing Finance Agency Risk-Sharing Program for Insured Affordable Multifamily Project Loans
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7946-7947]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4542]

[[Page 7945]]

_______________________________________________________________________

Part V

Department of Housing and Urban Development

_______________________________________________________________________

24 CFR Part 266

Regulatory Reinvention; Streamlining of Housing Finance Agency Risk-
Sharing Program for Insured Affordable Multifamily Project Loans; Final 
Rule

Federal Register / Vol. 61, No. 41 / Thursday, February 29, 1996 / 
Rules and Regulations 

[[Page 7946]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Office of the Assistant Secretary for Housing-Federal Housing 
Commissioner

24 CFR Part 266

[Docket No. FR-3981-F-01]
RIN 2502-AG60

Regulatory Reinvention; Streamlining of Housing Finance Agency 
Risk-Sharing Program for Insured Affordable Multifamily Project Loans

AGENCY: Office of the Assistant Secretary for Housing-Federal Housing 
Commissioner, HUD.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule streamlines HUD's regulations governing the 
Housing Finance Agency (HFA) Risk-Sharing program at 24 CFR part 266. 
Specifically, this rule removes regulatory provisions from part 266 
which are best set forth in non-regulatory guidance. Under the HFA 
Risk-Sharing Program, HFAs are permitted to originate and service 
mortgage loans that are fully insured by the Federal Housing 
Administration. Participating HFAs are required to share in the risk 
associated with monetary losses that may result from loan defaults. 
HUD's elimination of redundant or unnecessary language from part 266 
will increase program flexibility and assist in HUD's continuing 
efforts to streamline title 24.

EFFECTIVE DATE: April 1, 1996.

FOR FURTHER INFORMATION CONTACT: Jane Luton, Director, New Products 
Division, Office of Multifamily Housing Development, Room 6142, 
Department of Housing and Urban Development, 451 Seventh Street, SW, 
Washington, DC 20410, telephone number (202) 708-2556 (this is not a 
toll-free number). For hearing- and speech-impaired persons, this 
number may be accessed via TDD by calling the Federal Information Relay 
Service at 1-800-877-8339.

SUPPLEMENTARY INFORMATION:

I. Background

    On March 4, 1995, President Clinton issued a memorandum to all 
Federal departments and agencies regarding regulatory reinvention. In 
response to this memorandum, HUD conducted a page-by-page review of its 
regulations to determine which can be eliminated, consolidated, or 
otherwise improved. As part of this review, HUD reexamined its 
regulations governing the Housing Finance Agency (HFA) Risk-Sharing 
Program at 24 CFR part 266. Under the HFA Risk-Sharing Program, HFAs 
are permitted to originate and service mortgage loans that are fully 
insured by the Federal Housing Administration. Participating HFAs are 
required to share in the risk associated with monetary losses that may 
result from loan defaults.
    HUD has determined that the regulations for the HFA Risk-Sharing 
Program can be improved and streamlined by eliminating unnecessary 
provisions. After careful consideration, HUD has decided to retain most 
of part 266, inasmuch as the regulations are incorporated by reference 
in each approved HFA's Risk-Sharing Agreement. Since the Risk-Sharing 
Agreement forms the basis for operating the program, it is in HUD's 
interest, and that of program participants, to retain most sections of 
part 266. However, this final rule removes those sections of part 266 
concerning the application process and the contents of the Risk-Sharing 
Agreement.
    With respect to the section on application requirements, 
applications are solicited through publication of a notice in the 
Federal Register. Since that notice contains the requirements for 
submitting an application, including required exhibits, it is 
unnecessary to repeat such requirements in part 266. Therefore, this 
final rule revises Sec. 266.105, which concerns the application 
requirements, to simply state that HUD will identify all necessary 
requirements for the submission of an application through Federal 
Register notice.
    With respect to the section on the contents of the Risk-Sharing 
Agreement, an agreement for use by State and local HFAs participating 
in the program has been developed. Therefore, it is no longer necessary 
to list the items to be included in the Risk-Sharing Agreement. 
Accordingly, this final rule amends Sec. 266.15 to remove such a list.

II. Justification for Final Rulemaking

    HUD generally publishes a rule for public comment before issuing a 
rule for effect, in accordance with its own regulations on rulemaking 
in 24 CFR part 10. However, part 10 provides for exceptions to the 
general rule if the agency finds good cause to omit advance notice and 
public participation. The good cause requirement is satisfied when 
prior public procedure is ``impracticable, unnecessary, or contrary to 
the public interest'' (24 CFR 10.1). HUD finds that good cause exists 
to publish this rule for effect without first soliciting public 
comment. This final rule merely removes unnecessary provisions which 
can best be set forth in non-regulatory guidance. This rule does not 
establish or affect substantive policy. Therefore, prior public comment 
is unnecessary.

III. Other Matters

A. Regulatory Flexibility Act

    The Secretary, in accordance with the Regulatory Flexibility Act (5 
U.S.C. 605(b)), has reviewed and approved this final rule, and in so 
doing certifies that this rule will not have a significant economic 
impact on a substantial number of small entities. This rule merely 
streamlines 24 CFR part 266 by removing provisions which do not require 
regulatory codification. The rule will have no adverse or 
disproportionate economic impact on small businesses.

B. Environmental Impact

    This rulemaking does not have an environmental impact. This 
rulemaking simply amends an existing regulation by streamlining 
provisions and does not alter the environmental effect of the 
regulations being amended. A Finding of No Significant Impact with 
respect to the environment was made in accordance with HUD regulations 
in 24 CFR part 50 that implement section 102(2)(C) of the National 
Environmental Policy Act of 1969 (42 U.S.C. 4332) at the time of 
development of regulations implementing the HFA Risk-Sharing Program. 
That finding remains applicable to this rule and is available for 
public inspection between 7:30 a.m. and 5:30 p.m. weekdays in the 
Office of the Rules Docket Clerk, Office of General Counsel, Room 
10276, Department of Housing and Urban Development, 451 Seventh Street, 
SW, Washington, DC.

C. Executive Order 12612, Federalism

    The General Counsel, as the Designated Official under section 6(a) 
of Executive Order 12612, Federalism, has determined that this rule 
will not have substantial direct effects on States or their political 
subdivisions, or the relationship between the Federal government and 
the States, or on the distribution of power and responsibilities among 
the various levels of government. No programmatic or policy changes 
will result from this rule that would affect the relationship between 
the Federal Government and State and local governments.

D. Executive Order 12606, The Family

    The General Counsel, as the Designated Official under Executive 
Order 12606, The Family, has determined that this rule will not have 
the potential for significant impact on 

[[Page 7947]]
family formation, maintenance, or general well-being, and thus is not 
subject to review under the Order. No significant change in existing 
HUD policies or programs will result from promulgation of this rule.

List of Subjects in 24 CFR Part 266

    Aged, Fair housing, Intergovernmental relations, Mortgage 
insurance, Low and moderate income housing, Reporting and recordkeeping 
requirements.

    Accordingly, 24 CFR part 266 is amended as follows:

PART 266--HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED 
AFFORDABLE MULTIFAMILY PROJECT LOANS

    1. The authority citation for 24 CFR part 266 continues to read as 
follows:

    Authority: 12 U.S.C. 1707; 42 U.S.C. 3535(d).

    2. Section 266.15 is revised to read as follows:

Sec. 266.15  Risk-Sharing Agreement.

    Execution of a Risk-Sharing Agreement is a prerequisite to 
participation in this program. The Risk-Sharing Agreement shall be in a 
form acceptable to the Commissioner.
    3. Section 266.105 is revised to read as follows:

Sec. 266.105  Application requirements.

    (a) Applications for approval as a HUD-approved multifamily 
mortgagee. HFAs that are not HUD-approved mortgagees at the time of 
their application to participate in the program under this part must 
submit, concurrently, separate applications for approval to participate 
in the program and for approval to operate as a HUD-approved mortgagee. 
Application for approval as a HUD-approved mortgagee must be submitted 
to HUD in accordance with the applicable HUD requirements.
    (b) Applications for participation in program. Applications from 
HFAs for approval to participate in the program under this part will be 
submitted in response to a notice published in the Federal Register. 
The notice will include the required application exhibits and any other 
information or documentation necessary for approval for participation 
in the Risk-Sharing Program.

    Dated: February 22, 1996.
Nicolas P. Retsinas,
Assistant Secretary for Housing-Federal Housing Commissioner.
[FR Doc. 96-4542 Filed 2-28-96; 8:45 am]
BILLING CODE 4210-27-P

Complete official Federal Register PDF

FR Doc. 96-4507 Airworthiness Directives; Boeing Model 767 Series Airplanes
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7694-7695]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4507]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 96-NM-02-AD; Amendment 39-9526; AD 96-03-02 R1]

Airworthiness Directives; Boeing Model 767 Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This amendment clarifies information in an existing 
airworthiness directive (AD), applicable to certain Boeing Model 767 
series airplanes, that currently requires inspections to detect 
cracking and corrosion of the aft trunnion of the outer cylinder of the 
main landing gear (MLG) and various follow-on actions. That amendment 
also provides for termination of the inspections by repairing the outer 
cylinder and installing new aft trunnion bushings. The actions 
specified in that AD are intended to prevent the collapse of the MLG 
due to fracture of the aft trunnion outer cylinder. This amendment 
clarifies an inspection requirement of that AD. This amendment is 
prompted by communications received from affected operators that 
certain of the current requirements of the AD are unclear.

DATES: Effective February 16, 1996.
    The incorporation by reference of certain publications listed in 
the regulations was approved previously by the Director of the Federal 
Register as of February 16, 1996 (61 FR 3552, February 1, 1996).

ADDRESSES: The service information referenced in this AD may be 
obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, 
Washington 98124-2207. This information may be examined at the Federal 
Aviation Administration (FAA), Transport Airplane Directorate, 1601 
Lind Avenue, SW., Renton, Washington; or at the Office of the Federal 
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: James G. Rehrl, Aerospace Engineer, 
Airframe Branch, ANM-120S, FAA, Transport Airplane Directorate, Seattle 
Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, 
Washington 98055-4056; telephone (206) 227-2783; fax (206) 227-1181.

SUPPLEMENTARY INFORMATION: On January 22, 1996, the FAA issued AD 96-
03-02, amendment 39-9497 (61 FR 3552, February 1, 1996), which is 
applicable to certain Boeing Model 767 series airplanes. That AD 
requires various inspections to detect cracking and corrosion of the 
aft trunnion and various follow-on actions. That AD also provides 
operators with the option of terminating the requirement for the 
repetitive inspections by repairing the outer cylinder, and replacing 
the aft trunnion and crossbolt bushings with new bushings. That action 
was prompted by a report of the collapse of the right main landing gear 
(MLG) due to fracture of the aft trunnion outer cylinder. The actions 
required by that AD are intended to prevent the collapse of the MLG due 
to stress corrosion cracking of the aft trunnion of the outer cylinder.
    Since the issuance of that AD, the FAA has received communications 
from some affected operators questioning the inspection requirements of 
paragraph (a) of the AD. That paragraph states that operators are to 
perform the inspections described in ``Part 3 of the Accomplishment 
Instructions of Boeing Alert Service Bulletin 767-32A0151, dated 
November 30, 1995.'' The operators question whether ``Part 3'' is a 
typographical error that should have read ``paragraph III.''
    The FAA finds that clarification is necessary. Paragraph III of 
Boeing Alert Service Bulletin 767-32A0151 is entitled ``Accomplishment 
Instructions.'' Within paragraph III are five separate parts, entitled 
``Parts 1, 2, 3, 4, and 5,'' each of which describes various inspection 
procedures and follow-on actions.
    The FAA's intent in AD 96-03-02 was to require that operators 
perform all of the inspections (and follow-on actions) described in 
Parts 1, 2, 3, 4, and 5, of paragraph III, ``Accomplishment 
Instructions,'' of the referenced service bulletin. The Supplementary 
Information section of the preamble to that AD correctly described all 
of the inspections contained in Parts 1, 2, 3, 4, and 5, of paragraph 
III of the service bulletin, as those inspections that would be 
required by the AD. However, the wording of paragraph (a) of AD 96-03-
02 inadvertently was published as, ``Perform the inspections described 
in Part 3 of the Accomplishment Instructions of Boeing Alert Service 
Bulletin 767-32A0151 * * *'' With this wording, operators may 
incorrectly interpret paragraph (a) as requiring the accomplishment of 
only the inspections that are described in Part 3 of paragraph III of 
the service bulletin. Such misinterpretation could result in operators 
failing to perform the required inspections that are described in Parts 
1, 2, 4, and 5, of paragraph III.
    Since it is obvious that, currently, the requirements of AD 96-03-
02 are not clearly worded, the FAA has determined that the wording of 
paragraph (a) of the AD must be revised to clarify the required 
actions. This action revises paragraph (a) to state that operators must 
perform all of the inspections described in paragraph III, 
``Accomplishment Instructions,'' of the Boeing alert service bulletin.
    Action is taken herein to clarify these requirements of AD 96-03-02 
and to correctly add the AD as an amendment to section 39.13 of the 
Federal Aviation Regulations (14 CFR 39.13).
    The final rule is being reprinted in its entirety for the 
convenience of affected operators. The effective date remains February 
16, 1996.
    Since this action only clarifies a current requirement, it has no 
adverse economic impact and imposes no additional burden on any person. 
Therefore, notice and public procedures hereon are unnecessary.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Correction

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701. 
    
[[Page 7695]]

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing amendment 39-9497 (61 FR 
3552, February 1, 1996), and by adding a new airworthiness directive 
(AD), amendment 39-9526, to read as follows:

96-03-02 R1 Boeing: Amendment 39-9526. Docket 96-NM-02-AD. Revises 
AD 96-03-02, Amendment 39-9497.

    Applicability: Model 767 series airplanes having line numbers 
001 through 609, on which the terminating action described in 
paragraph (e) of this AD has not been accomplished; certificated in 
any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (g) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent the collapse of the main landing gear (MLG) due to 
stress corrosion cracking of the aft trunnion of the outer cylinder, 
accomplish the following:
    (a) Perform the inspections described in paragraph III, 
Accomplishment Instructions, of Boeing Alert Service Bulletin 767-
32A0151, dated November 30, 1995, to detect cracking and corrosion 
of the aft trunnion of the outer cylinder of the MLG at the time 
specified in paragraph (a)(1), (a)(2), or (a)(3) of this AD, as 
applicable. These inspections are to be accomplished in accordance 
with Figure 1 of that alert service bulletin. Repeat these 
inspections thereafter at the intervals specified in that alert 
service bulletin. To determine the category in which an airplane 
falls, the age of the outer cylinder of the MLG is to be calculated 
as of the effective date of this AD. For airplanes on which the age 
of the right MLG differs from the age of the left MLG, an operator 
may place the airplane into a category that is the higher 
(numerically) of the two categories to ease its administrative 
burden, and to simplify the recordkeeping requirements imposed by 
this AD. Once the category into which an airplane falls is 
determined, operators must obtain approval from the Manager, Seattle 
Aircraft Certification Office (ACO), FAA, Transport Airplane 
Directorate, to move that airplane into another category.

    Note 2: The broken (dash) lines used in Figure 1 of Boeing Alert 
Service Bulletin 767-32A0151, dated November 30, 1995, denote ``go 
to'' actions for findings of discrepancies detected during any of 
the inspections required by this AD.

    Note 3: Boeing Alert Service Bulletin 767-32A0151, dated 
November 30, 1995, refers to Boeing Alert Service Bulletin 767-
32A0148, dated December 21, 1995, for procedures to repair the outer 
cylinder and replace the bushings in the outer cylinder of the MLG 
with new bushings.

    (1) For airplanes identified as Category 3 in paragraph I.C. of 
Boeing Alert Service Bulletin 767-32A0151, dated November 30, 1995: 
Perform the initial inspections within 30 days after the effective 
date of this AD.
    (2) For airplanes identified as Category 2 in paragraph I.C. of 
Boeing Alert Service Bulletin 767-32A0151, dated November 30, 1995: 
Perform the initial inspections within 90 days after the effective 
date of this AD.
    (3) For airplanes identified as Category 1 in paragraph I.C. of 
Boeing Alert Service Bulletin 767-32A0151, dated November 30, 1995: 
Perform the initial inspections prior to the accumulation of 2\1/2\ 
years since the MLG outer cylinder was new or overhauled, or within 
150 days after the effective date of this AD, whichever occurs 
later.
    (b) If no cracking or corrosion is detected, accomplish the 
follow-on actions described in the Boeing Alert Service Bulletin 
767-32A0151, November 30, 1995, at the time specified in the alert 
service bulletin. These follow-on actions are to be accomplished in 
accordance with that alert service bulletin.
    (c) If any cracking is detected, prior to further flight, 
replace the outer cylinder with a new or serviceable outer cylinder 
in accordance with Boeing Alert Service Bulletin 767-32A0151, dated 
November 30, 1995.
    (d) If any corrosion is detected, accomplish the follow-on 
actions at the time specified in the ``Corrosion Flowchart,'' in 
Figure 1 of Boeing Alert Service Bulletin 767-32A0151, dated 
November 30, 1995. The follow-on actions are to be accomplished in 
accordance with that alert service bulletin.
    (e) Repair of the outer cylinder and replacement of the bushings 
in the aft trunnion and crossbolt of the MLG with new bushings in 
accordance with Boeing Alert Service Bulletin 767-32A0148, dated 
December 21, 1995, constitute terminating action for the inspection 
requirements of this AD, and for the requirements of AD 95-19-10, 
amendment 39-9372, and AD 95-20-51, amendment 39-9398. Boeing Alert 
Service Bulletin 767-32A0148, dated December 21, 1995, refers to 
Component Maintenance Manual (CMM) 32-11-40. Operators should note 
that, although the CMM specifies plugging the aft trunnion 
lubrication fitting with a rivet, this AD does not require plugging 
the lube fitting to terminate the requirement of this AD, AD 95-19-
10, or AD 95-20-51.
    (f) Accomplishment of the requirements of this AD is considered 
acceptable for compliance with AD 95-19-10, amendment 39-9372, and 
AD 95-20-51, amendment 39-9398.
    (g) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Seattle ACO. Operators shall submit 
their requests through an appropriate FAA Principal Maintenance 
Inspector, who may add comments and then send it to the Manager, 
Seattle ACO.

    Note 4: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Seattle ACO.

    (h) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (i) The actions shall be done in accordance with Boeing Alert 
Service Bulletin 767-32A0151, dated November 30, 1995, and Boeing 
Alert Service Bulletin 767-32A0148, dated December 21, 1995. This 
incorporation by reference was approved previously by the Director 
of the Federal Register, in accordance with 5 U.S.C. 552(a) and 1 
CFR part 51, as of February 16, 1996 (61 FR 3552, February 1, 1996). 
Copies may be obtained from Boeing Commercial Airplane Group, P.O. 
Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at 
the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., 
Renton, Washington; or at the Office of the Federal Register, 800 
North Capitol Street, NW., suite 700, Washington, DC.
    (j) This amendment is effective on February 16, 1996.

    Issued in Renton, Washington, on February 22, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-4507 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-4480 Defense Federal Acquisition Regulation Supplement; Miscellaneous Amendments
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7739-7751]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4480]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

48 CFR Parts 202, 204, 209, 213, 215, 216, 217, 223, 225, 228, 232, 
235, 236, 242, 246, 252, 253, and Appendix G to Chapter 2

[Defense Acquisition Circular (DAC) 91-10]

Defense Federal Acquisition Regulation Supplement; Miscellaneous 
Amendments

AGENCY: Department of Defense (DoD).

ACTION: Final rules.

-----------------------------------------------------------------------

SUMMARY: Defense Acquisition Circular (DAC) 91-10 amends the Defense 
Federal Acquisition Regulation Supplement (DFARS) to revise, finalize, 
or add language on undefinitized contract actions; warranties; 
institutions of higher education; should cost reviews; construction and 
architect-engineer contracts; sensitive conventional arms, ammunition, 
and explosives; international trade agreements; foreign offset 
agreements; tank and automotive forging items; progress payment rates; 
research and development contracting; contract administration; and 
foreign military sales.

EFFECTIVE DATE: February 29, 1996.

FOR FURTHER INFORMATION CONTACT:
Mrs. Susan Buckmaster, OUSD(A&T)DP(DAR), IMD 3D139, 3062 Defense 
Pentagon, Washington, DC 20301-3062. Telephone (703) 602-0131. Telefax 
(703) 602-0350.

SUPPLEMENTARY INFORMATION:

A. Background

    This Defense Acquisition Circular (DAC) 91-10 includes 17 rules and 
miscellaneous editorial amendments. Three of the rules in the DAC 
(Items VII, X, and XVII) were published previously in the Federal 
Register (61 FR 130, January 3, 1996; 61 FR 3600, February 1, 1996; and 
February 26, 1996; respectively) and thus are not included as part of 
this rulemaking notice. These three rules are being published in the 
DAC to conform the loose-leaf edition of DFARS to the previously 
published revisions.

B. Regulatory Flexibility Act

DAC 91-10, Items IV, XII, XIII, XIV, XV, and XVI

    The Regulatory Flexibility Act does not apply because these rules 
are not significant revisions within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601 et seq. However, comments from small 
entities will be considered in accordance with Section 610 of the Act. 
Please cite the applicable DFARS case number in correspondence.

DAC 91-10, Items I, III, V, VIII, IX, and XI

    DoD certifies that these rules will not have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act because:
    Item I--The rule primarily (1) pertains to internal Government 
considerations regarding use of warranties; and (2) consolidates and 
standardizes existing regulatory requirements pertaining to 
undefinitized contract actions.
    Item III--Contracts awarded to small entities normally are not 
subject to program or overhead should-cost reviews.
    Item V--The rule merely provides a standard method of implementing 
security requirements which already exist under DoD 5100.76-M.
    Item VIII--The rule retains the policy of acquiring tank and 
automotive forging items from domestic sources to the maximum extent 
practicable. The new exception only applies to forging items purchased 
as tank and automotive spare parts, when the end use of the spare parts 
is unknown.
    Item IX--The rule merely clarifies the scope of offset 
administrative costs that 

[[Page 7740]]
contractors may recover under foreign military sales contracts. Also, 
most companies involved in offset arrangements are not small 
businesses.
    Item XI--The reduction in the customary progress payment rate only 
applies to large businesses. While the rule also precludes the use of 
flexible progress payments for contracts resulting from solicitations 
issued on or after November 30, 1993, this change is not expected to 
have a significant economic impact on a substantial number of small 
entities, because the customary progress payment rates for small and 
small disadvantaged businesses generally are more favorable than a 
flexible progress payment rate with its associated terms and 
conditions.

DAC 91-10, Items II and VI

    The Regulatory Flexibility Act applies. A final regulatory analysis 
has been performed and is available by writing the Defense Acquisition 
Regulations Council, OUSD(A&T)DP(DAR), 3062 Defense Pentagon, 
Washington, DC 20301-3062

C. Paperwork Reduction Act

DAC 91-10, Items I, II, III, IV, VI, VIII, IX, XI, XII, XIII, XIV, XV, 
and XVI

    The Paperwork Reduction Act does not apply because these rules do 
not impose any information collection requirements which require the 
approval of OMB under 44 U.S.C. 3501 et seq.

DAC 91-10, Item V

    The Paperwork Reduction Act applies. OMB has approved the 
information collection requirement under OMB Control Number 0704-0385.
Michele P. Peterson,
Executive Editor, Defense Acquisition Regulations Council.

    Defense Acquisition Circular (DAC) 91-10 amends the Defense Federal 
Acquisition Regulation Supplement (DFARS) 1991 edition. The amendments 
are summarized as follows:

Item I--Contract Award (DFARS Case 95-D702)

    This final rule (1) amends DFARS Parts 216 and 217 to implement 
Section 1505 of Pub. L. 103-355 and to clarify guidance on 
undefinitized contract actions (UCAs); (2) amends the guidance on 
warranties at 246.770 to implement Section 2402 of Pub. L. 103-355; and 
(3) adds a new clause on definitization of UCAs at 252.217-7027. The 
new clause is similar to, and will be used instead of, the clause as 
FAR 52.216-25, Contract Definitization, which was designed for use in 
letter contracts only.

Item II--Institutions of Higher Education (DFARS Case 94-D310)

    The interim rule published as Item IX of DAC91-9 is revised and 
finalized. The rule implements Section 558 of the Fiscal Year 1995 
Defense Authorization Act (Pub. L. 103-337). Section 558 provides that 
no funds available to DoD may be provided by grant or contract to any 
institution of higher education that has a policy of denying, or which 
effectively prevents the Secretary of Defense from obtaining for 
military recruiting purposes, entry to campuses, access to students on 
campuses, or access to directory information pertaining to students. 
The final rule differs from the interim rule in that it makes 
clarifying revisions at 209.470-1 and 252.209-7005, and adds language 
at 209.470-1(c) to state that, when specific subordinate elements of an 
institution of higher education, rather than the institution as a 
whole, have a prohibited policy or practice, the prohibition on use of 
DoD funds applies only to those subordinate elements.

Item III--Overhead Should Cost Reviews (DFARS Case 92-D010

    This final rule revises DFARS 215.810 to specify when DoD 
activities should consider performing an overhead should cost review of 
a contractor business unit. This DFARS rule supplements the FAR rule 
published as Item VIII of Federal Acquisition Circular 90-37 on January 
26, 1996. Both the FAR and the DFARS rules become effective on March 
26, 1996.

Item IV--Cost-Plus-Fixed-Fee Contracts for Military Construction (DFARS 
Case 95-D024)

    This final rule adds new sections at DFARS 216.306 and 232.703-70 
and revises 236.271 to expand guidance on statutory restrictions 
pertaining to the use of cost-plus-fixed-fee contracts for military 
construction.

Item V--Safeguarding Sensitive Conventional Arms, Ammunition, and 
Explosives (DFARS Case 95-D001)

    This final rule adds a new subpart at DFARS 223.72 and a new 
contract clause at 252.223-7007 to provide guidance on physical 
security requirements for contracts involving sensitive conventional 
arms, ammunition, and explosives. Section 204.202 is amended to specify 
additional requirements for distribution of contracts containing the 
clause at 252.223-7007.

Item VI--Applicability of Trade Agreements (DFARS Case 95-D022)

    This final rule amends DFARS 225.402 to provide that the value of 
an acquisition for purposes of determining the applicability of both 
the North American Free Trade Agreement Act and the Trade Agreements 
Act is the total value of all end products subject to the acts.

Item VII--Uruguay Round (1996 Agreement) (DFARS Case 95-D306)

    This final rule was issued by Departmental Letter 95-019, effective 
January 1, 1996. The rule amends DFARS 225.402 and the clause at 
252.225-7007 to implement the DoD-unique requirements of the 
renegotiated General Agreement on Tariffs and Trade (GATT) Government 
Procurement Agreement (1996 Code) (Uruguay Round), which became 
effective January 1, 1996. This agreement is implemented in statute by 
the Uruguay Round Agreement Act, Pub. L. 103-465, which amends the 
Trade Agreements Act of 1979.

Item VIII--Tank and Automotive Forging Items (DFARS Case 95-D003)

    This final rule amends DFARS Subpart 225.71 to add an exception to 
the foreign source restrictions on the acquisition of forgings. The 
rule excludes forging purchases as tank and automotive spare parts from 
foreign source restrictions, except when it is known that the parts are 
for use in tanks only.

Item IX--Offset Implementation Costs (DFARS Case 95-D019)

    This final rule amends DFARS 225.7303-2 to clarify that, under a 
foreign military sales contract, a contractor may recover costs 
incurred to implement its offset agreement with a foreign government or 
international organization, if the foreign military sale Letter of 
Offer and Acceptance is financed wholly with customer cash or repayable 
foreign military finance credits.

Item X--Alternatives to Miller Act Bonds (DFARS Case 95-D305)

    This interim rule was issued by Departmental Letter 96-001, 
effective February 1, 1996. The rule revises the interim rule which was 
published as Item XXIII of DAC 91-9 to provide alternative payment 
protections for construction contracts between $25,000 and $100,000, 
pending implementation of Section 4104(b)(2) of the Federal Acquisition 
Streamlining Act of 1994 (Pub. L. 103-355) in the FAR. This interim 
rule amends the guidance at 

[[Page 7741]]
DFARS 228.171 to require the contracting officer to specify two or more 
alternative payment protections when using the clause at 252.228-7007, 
and to give particular consideration to use of an irrevocable letter of 
credit as one of the specified alternatives. This rule also amends the 
clause at 252.228-7007 to exclude payment bonds from the payment 
protections under which the contracting officer may access funds.

Item XI--Reduction in Progress Payment Rates (DFARS Case 93-D305)

    The interim rule published as Item XXVII of DAC 91-6 is revised and 
finalized. The rule implements Section 8155 of the Fiscal Year 1994 
Defense Appropriations Act (Pub. L. 103-139). Section 8155 requires DoD 
to reduce the customary progress payment rate for large business 
concerns from 85 percent to 75 percent for contracts resulting from 
solicitations issued on or after November 11, 1993. The final rule 
differs from the interim rule in that it makes an editorial change in 
the table at 232.502-1-71, and amends the clause at 252.232-7004 to 
state that the 75 percent customary progress payment rate for large 
business concerns also applies to progress payments made under 
undefinitized contract actions.

Item XII--Streamlined Research and Development (R&D) Update (DFARS Case 
95-D036)

    This final rule amends DFARS Subpart 235.70 to update 
administrative information pertaining to the streamlined R&D 
contracting test program, and to revise the list of clauses in the 
streamlined R&D contracting format to conform to FAR and DFARS 
revisions which occurred since initiation of the test program.

Item XIII--Performance Evaluations for Construction and Architect-
Engineer Contracts (DFARS Case 95-D034)

    This final rule amends DFARS 236.201 and 236.604 to prescribe use 
of DD Forms 2626 and 2631 in lieu of Standard Forms 1420 and 1421, 
respectively. The forms are used to document contractor performance 
under construction and architect-engineer contracts. Copies of DD Forms 
2626 and 2631 are added to Subpart 253.3.

Item XIV--Magnitude of Construction Projects (DFARS Case 95-D031)

    This final rule adds a new section at DFARS 236.204 to provide 
additional price ranges for identifying the magnitude of construction 
projects in advance notices and solicitations.

Item XV--Flexible Contract Administration Services (DFARS Case 95-
D030)

    This final rule amends DFARS 242.203 to expand the conditions under 
which the Defense Contract Management Command may perform contract 
administration services on a military installation.

Item XVI--Military Assistance Program Address (MAPAD) Codes (DFARS Case 
95-D032)

    This final rule amends DFARS 253./213-70 to clarify instructions 
for inclusion of foreign military sale shipment information in Block 14 
of DD Form 1155.

Item XVII--Allowability of Costs (DFARS Case 95-D309)

    This interim rule was issued by Departmental Letter 96-002, 
effective February 26, 1996. The rule adds language at DFARS 231.205-6 
to implememt Section 8122 of the Fiscal Year 1996 Defense 
Appropriations Act (Pub. L. 104-61). Section 8122 prohibits DoD from 
using fiscal year 1996 funds to reimburse a contractor for costs paid 
by the contractor to an employee for a bonus or other payment in excess 
of the normal salary paid to the employee, when such payment is part of 
restructuring costs associated with a business combination.

Item XVIII--Small Disadvantaged Business Utilization Program 
(Information Item)

    On October 23, 1995, the Under Secretary of Defense for Acquisition 
and Technology suspended those sections of the DFARS which prescribe 
set-aside of acquisitions for small disadvantaged businesses. This 
suspension takes account of the Supreme Court's decision in Adarand 
Constructors, Inc. v. Pena, 63 U.S.L.W. 4523 (U.S. June 12, 1995), 
while an interagency Government-wide review of affirmative action 
programs is conducted. The suspended DFARS sections are 219.501(S-70), 
219.502-2-70, 219.502-4, 219.504(b)(i), 219.506, 219.508(e), 219.508-
70, and 252.219-7002. Although these sections, and references thereto, 
still appear in the DFARS text, use of these sections is suspended 
until further notice.

Item XIX--Editorial Revisions

    (a) DFARS 202.101 and Appendix G are amended to update activity 
names and addresses.
    (b) DFARS Part 213 is amended to update statutory references and to 
conform to revisions to FAR Part 13 published in Federal Acquisition 
Circular 90-29.
    (c) DFARS 228.106-4, 228.106-4-70, 228.106-6, and 252.228-7006 are 
deleted. The guidance in these sections has been superseded by the 
guidance in FAR 28.106-4(b), 28.106-6(d), and 52.228-12, published in 
Federal Acquisition Circular 90-32.
    (d) DFARS Part 253 is amended to update DD Forms 375, 375c, 428, 
1659, 2222, 2222-2, and 2604. (This amendment is being made only in the 
loose-leaf edition of the DFARS.)

Interim Rules Adopted as Final With Changes

PARTS 209 AND 252--[AMENDED]

    The interim rule published at 60 FR 13073 on March 10, 1995, and 
amended at 60 FR 61593 and 61600 on November 30, 1995, is adopted as 
final with a revision at section 209.470-1 and amendments at section 
252.209-7005.

PARTS 232 AND 252--[AMENDED]

    The interim rule published at 58 FR 62045 on November 24, 1993, and 
corrected at 58 FR 64363 on December 6, 1993, is adopted as final with 
amendments at section 252.232-7004.

List of Subjects in 48 CFR Parts 202, 204, 209, 213, 215, 216, 217, 
223, 225, 228, 232, 235, 236, 242, 246, 252, 253, and Appendix G to 
Chapter 2

    Government procurement.

Amendments to 48 CFR Chapter 2 (Defense Federal Acquisition Regulation 
Supplement)

    48 CFR Chapter 2 (the Defense Federal Acquisition Regulation 
Supplement) is amended as set forth below.
    1. The authority for 48 CFR Parts 202, 204, 209, 213, 215, 216, 
217, 223, 225, 228, 232, 235, 236, 242, 246, 252, 253, and Appendix G 
to Chapter 2 continues to read as follows:

    Authority: 41 U.S.C. 421 and 48 CFR Chapter 1.

PART 202--DEFINITIONS OF WORDS AND TERMS

202.101  [Amended]

    2. Section 202.101 is amended in the definition entitled 
``Contracting activity'' under the heading ``NAVY,'' by removing the 
two entries ``Ships Parts Control Center'' and ``Navy Aviation Supply 
Office'', by adding the entry ``Naval Inventory Control Point'' after 
the entry ``Naval Facilities Engineering Command''; and by revising the 
entry ``U.S. Marine Corps Research, Development, and Acquisition 
Command'' to read ``Marine Corps Systems Command''.

[[Page 7742]]

PART 204--ADMINISTRATIVE MATTERS

    3. Section 204.202 is amended by removing in paragraph (1)(iii) the 
word ``and''; by removing in paragraph (1)(iv) the period and adding 
``; and''; and by adding a new paragraph (1)(v) to read as follows:

204.202  Agency distribution requirements.

    (1) * * * 
    (v) One copy, or an extract of the pertinent information, to the 
cognizant Defense Investigative Service office listed in DoD 5100.76-M, 
Physical Security of Sensitive Conventional Arms, Ammunition, and 
Explosives, when the clause at 252.223-7007, Safeguarding Sensitive 
Conventional Arms, Ammunition, and Explosives, is included in the 
contract.
* * * * *

PART 209--CONTRACTOR QUALIFICATIONS

    4. Section 209.470-1 is revised to read as follows:

209.470-1  Policy.

    (a) Section 558 of the National Defense Authorization Act for 
Fiscal Year 1995 (Public Law 103-337) provides that no funds available 
to DoD may be provided by grant or contract to any institution of 
higher education that has a policy of denying or that effectively 
prevents the Secretary of Defense from obtaining for military 
recruiting purposes--
    (1) Entry to campuses or access to students on campuses; or
    (2) Access to directory information pertaining to students.
    (b) Institutions of higher education that are determined under 32 
CFR part 216 to have the policy or practice in paragraph (a) of this 
subsection shall be listed as ineligible on the List of Parties 
Excluded from Federal Procurement Programs published by the General 
Services Administration (see FAR 9.404).
    (c) In cases where a determination is made under 32 CFR part 216 
that specific subordinate elements of an institution of higher 
education, rather than the institution as a whole, have the policy or 
practice in paragraph (a) of this subsection, 32 CFR part 216 provides 
that the prohibition on use of DoD funds applies only to those 
subordinate elements.
    5. Part 213 heading is revised to read as follows:

PART 213--SIMPLIFIED ACQUISITION PROCEDURES

213.000  [Amended]

    6. Section 213.000 is amended by revising the words ``small 
purchase'' to read ``simplified acquisition'' and by revising the 
threshold ``$100,000'' to read ``$200,000''.
    7. Section 213.101 is amended by revising the introductory text; by 
adding a comma in paragraph (1) between the word ``operations'' and the 
word ``or''; and by revising paragraph (2). The revisions read as 
follows:

213.101  Definitions.

    Contingency operation is defined in 10 U.S.C. 101(a)(13) as a 
military operation that--
* * * * *
    (2) Results in the call or order to, or retention on, active duty 
of members of the uniformed services under section 688, 12301(a), 
12302, 12304, 12305, or 12406 of Title 10, chapter 15 of Title 10, or 
any other provision of law during a war or during a national emergency 
declared by the President or Congress.

213.204  [Amended]

    8. Section 213.204 is amended by revising in paragraph (b) the 
phrase ``above the dollar threshold at FAR 13.000'' to read ``not using 
simplified acquisition procedures.''

213.402  [Amended]

    9. Section 213.402 is redesignated as 213.401.

213.403  [Amended]

    10. Section 213.403 is redesignated as 213.402.

213.404  [Amended]

    11. Section 213.404 is redesignated as 213.403. Newly designated 
Section 213.403 is amended by adding a period at the end of paragraph 
(c)(i)(B); and by revising in paragraph (c)(ii) the words ``small 
purchases'' to read ``simplified acquisitions.''

213.502-2  [Amended]

    12. Section 213.502-2 is redesignated as Section 213.505-1. Newly 
designated Section 213.505-1 is amended by revising the heading to read 
``Optional Form (OF) 347, Order for Supplies or Services, and Optional 
Form 348, Order for Supplies or Services Schedule-Continuation.''; by 
removing in the introductory text the hyphen between the words 
``Services'' and ``Schedule''; by adding a hyphen between the words 
``Schedule'' and ``Continuation'', by revising in paragraph (b)(i) the 
words ``small purchase'' to read ``simplified acquisition''; and by 
revising the sentence in paragraph (b)(i)(F)(3) to read ``A purchase 
order for acquisitions using simplified acquisition procedures.''
    13. Section 213.505-3 is amended by revising paragraph (b)(1) 
introductory text to read as follows:

213.505-3  Standard Form 44, Purchase Order-Invoice-Voucher.

    (b)(1) The micro-purchase limitation applies to all purchasers 
except that purchases up to the simplified acquisition threshold may be 
made for--
* * * * *
    14. Section 213.507 is amended by revising the heading; and by 
revising paragraph (a)(i) to read as follows:

213.507  Provisions and clauses.

    (a) * * *
    (i) Unilateral purchase orders--
    (A) FAR 52.252-2, Clauses Incorporated by Reference (required only 
if other clauses are incorporated by reference);
    (B) FAR 52.203-3, Gratuities;
    (C) FAR 52.211-16, Variation in Quantity;
    (D) FAR 52.222-3, Convict Labor (unless the order will be subject 
to the Walsh-Healey Public Contracts Act (see FAR subpart 22.6));
    (E) FAR 52.222-26, Equal Opportunity (unless exempt under FAR 
22.807);
    (F) FAR 52.225-3, Buy American Act-Supplies;
    (G) FAR 52.232,-1, Payments;
    (H) FAR 52.232-25, Prompt Payment;
    (I) FAR 52.232-28, Electronic Funds Transfer Payment Methods;
    (J) FAR 52.233-1, Disputes;
    (K) FAR 52.246-1, Contractor Inspection Requirements (except when 
an alternate level of quality assurance is necessary (see FAR 46.203 
and 46.204)); and
    (L) FAR 52.246-16, Responsibility for Supplies.
* * * * *

PART 215--CONTRACTING BY NEGOTIATION

    15. Section 215.810 is revised to read as follows:

215.810  Should-cost review.

    16. Section 215.810-2 is added to read as follows:

215.810-2  Program should-cost review.

    (b) DoD contracting activities should consider performing a program 
should-cost review before award of a definitive major systems contract 
exceeding $100 million.
    17. Section 215.810-3 is added to read as follows:
    
[[Page 7743]]

215.810-3  Overhead should-cost review.

    (a) Contact the DCMC/DLA Overhead Center, Fort Belvoir, VA 22060-
6221, at (703) 767-3387, for questions on overhead should-cost 
analysis.
    (b)(i) The Defense Contract Management Command/Defense Logistics 
Agency (DCMC/DLA), or the military department responsible for 
performing contract administration functions (e.g., Navy SUPSHIP), 
should consider, based on risk assessment, performing an overhead 
should-cost review of a contractor business unit (as defined in FAR 
31.001) when all of the following conditions exist:
    (A) Projected annual sales to DoD exceed $1 billion.
    (B) Projected DoD versus total business exceeds 30 percent;
    (C) Level of sole-source DoD contracts is high;
    (D) Significant volume of proposal activity is anticipated;
    (E) Production or development of a major weapon system or program 
is anticipated; and
    (F) Contractor cost control/reduction initiatives appear 
inadequate.
    (ii) The head of the contracting activity may request an overhead 
should-cost review for a business unit which does not meet the criteria 
in paragraph (b)(i) of this subsection.
    (iii) Overhead should-cost reviews are labor intensive. These 
reviews generally involve participation by the contracting, contract 
administration, and contract audit elements. The extent of availability 
of military department, contract administration, and contract audit 
resources to support DCMC/DLA-led teams should be considered when 
determining whether a review will be conducted. Overhead should-cost 
reviews generally shall not be conducted at a contractor business 
segment more frequently than every three years.

PART 216--TYPES OF CONTRACTS

    18. Section 216.306 is added to read as follows:

216.306  Cost-plus-fixed-fee contracts.

    (c) Limitations.
    (i) Annual military construction appropriations acts restrict the 
use of cost-plus-fixed-fee contracts that--
    (A) Are funded by a military construction appropriations act:
    (B) Are estimated to exceed $25,000; and
    (C) Will be performed within the United States, except Alaska.
    (ii) The Secretaries of the military departments are authorized to 
approve contracts described in paragraph (c)(i) of this section that 
are for environmental work only, provided the environmental work is not 
classified as construction, as defined by 10 U.S.C 2801.
    (iii) The Secretary of Defense or designee must specifically 
approve contracts described in paragraph (c)(i) of this section that 
are not environmental work only.
    19. Section 216.603-4 is revised to read as follows:

216.603-4  Contract clauses.

    (b)(2) See 217.7406(a) for additional guidance regarding use of the 
clause at FAR 52.216-24, Limitation of Government Liability.
    (3) Use the clause at 252.217-7027, Contract Definitization, in 
accordance with its prescription at 217.7406(b), instead of the clause 
at FAR 52.216-25, Contract Definitization.
    20. Section 216.703 is amended by revising paragraph (c) to read as 
follows:

216.703  Basic ordering agreements

    (c) Limitations. The period during which orders may be placed 
against a basis ordering agreement may not exceed three years. The 
contracting officer, with the approval of the chief of the contracting 
office, may grant extensions for up to two years. No single extension 
shall exceed one year. See subpart 217.74 for additional limitations on 
the use of undefinitized orders under basic ordering agreements.
* * * * *

PART 217--SPECIAL CONTRACTING METHODS

    21. Section 217.202 is amended by adding paragraph (3) to read as 
follows:

217.202  Use of options.

* * * * *
    (3) See subpart 217.74 for limitations on the use of undefinitized 
options.
    22. Section 217.7402 is amended by revising in the introductory 
text the term ``UCA's'' to read ``UCAs'' and by revising paragraph (b) 
to read as follows:

217.7402  Exceptions.

* * * * *
    (a) * * *
    (b) Purchases at or below the simplified acquisition threshold;
* * * * *

217.7404-3  [Amended]

    23. Section 217.7404-3 is amended by revising in the introductory 
text of paragraph (a) the word ``earliest'' to read ``earlier.''
    24. Section 217.7406 is revised to read as follows:

217.7406  Contract clauses.

    (a) Use the clause at FAR 52.216-24, Limitation of Government 
Liability, in all UCAs, solicitations associated with UCAs, basic 
ordering agreements, indefinite delivery contracts, and any other type 
of contract providing for the use of UCAs.
    (b) Use the clause at 252.217-7027, Contract Definitization, in all 
UCAs, solicitations associated with UCAs, basic ordering agreements, 
indefinite delivery contracts, and any other type of contract providing 
for the use of UCAs. Insert the applicable information in paragraphs 
(a), (b), and (d) of the clause. If, at the time of entering into the 
UCA, the contracting officer knows that the definitive contract action 
will meet the criteria of FAR 15.804-1 for not requiring submission of 
cost or pricing data, the words ``and cost or pricing data'' may be 
deleted from paragraph (a) of the clause.

PART 223--ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-
FREE WORKPLACE

    25. A new Subpart 223.72 is added to read as follows:
Subpart 223.72--Safeguarding Sensitive Conventional Arms, Ammunition, 
and Explosives
Sec.
223.7200  Definition.
223.7201  Policy.
223.7202  Preaward responsibilities.
223.7203  Contract clause.

Subpart 223.72--Safeguarding Sensitive Conventional Arms, 
Ammunition, and Explosives

223.7200  Definition.

    ``Arms, ammunition, and explosives (AA&E),'' as used in this 
subpart, means those items within the scope (chapter 1, paragraph B) of 
DoD 5100.76-M, Physical Security of Sensitive Conventional Arms, 
Ammunition, and Explosives.

223.7201  Policy.

    (a) The requirements of DoD 5100.76-M, Physical Security of 
Sensitive Conventional Arms, Ammunition, and Explosives, shall be 
applied to contracts when--
    (1) AA&E will be provided to the contractor or subcontractor as 
Government-furnished property; or
    (2) The principal development, production, manufacture, or purchase 
of AA&E is for DoD use.
    (b) The requirements of DoD 5100.76-M need not be applied to 
contracts when-- 

[[Page 7744]]

    (1) The AA&E to be acquired under the contract is a commercial item 
within the meaning of FAR 2.101; or
    (2) The contract will be performed in a Government-owned 
contractor-operated ammunition production facility. However, if 
subcontracts issued under such a contract will meet the criteria of 
paragraph (a) of this section, the requirements of DoD 5100.76-M shall 
apply.

223.7202  Preaward responsibilities.

    When an acquisition involves AA&E, technical or requirements 
personnel shall specify in the purchase request--
    (a) That AA&E is involved; and
    (b) Which physical security requirements of DoD 5100.76-M apply.

223.7203  Contract clause.

    Under the clause at 252.223-7007, Safeguarding Sensitive 
Conventional Arms, Ammunition, and Explosives, in all solicitations and 
contracts to which DoD 5100.76-M applies, in accordance with the policy 
at 223.7201. Complete paragraph (b) of the clause based on information 
provided by cognizant technical or requirements personnel.

PART 225--FOREIGN ACQUISITION

    26. Section 225.402 is amended by revising paragraph (a) to read as 
follows:

225.402  Policy.

    (a) To estimate the value of the acquisition, use the total 
estimated value of end products subject to trade agreement acts (see 
225.403-70).
    (1) See 225.105 for evaluation of eligible products and U.S. made 
end products.
* * * * *
    27. Section 225.7102 is amended by revising the introductory text 
to read as follows:

225.7102  Policy.

    DoD requirements for the following, including acquisitions for 
items containing the following, shall be acquired from domestic sources 
(as described in the clause at 252.225-7025) to the maximum extent 
practicable--
* * * * *
    28. Section 225.7103 is amended by revising paragraph (e)(1); 
redesignating paragraph (e)(2) as (e)(3); and adding paragraph (e)(2) 
to read as follows:

225.7103  Exceptions.

* * * * *
    (e) * * *
    (1) Used for commercial vehicles or noncombat support military 
vehicles;
    (2) Purchased as tank and automotive spare parts (except when it is 
known that the spare parts are for use in tanks only); or
* * * * *
    29. Section 225.7303-2 is amended by revising paragraph (a)(3) to 
read as follows:

225.7303-2  Cost of doing business with a foreign government or an 
international organization.

    (a) * * *
    (3) Offset implementation costs.
    (i) A U.S. defense contractor may recover costs incurred to 
implement its offset agreement with a foreign government or 
international organization if the foreign military sale Letter of Offer 
and Acceptance is financed wholly with customer cash or repayable 
foreign military finance credits.
    (ii) The U.S. Government assumes no obligation to satisfy or 
administer the offset requirement or to bear any of the associated 
costs.
* * * * *

PART 228--BONDS AND INSURANCE

228.106-4, 228.106-4-70, and 228.106-6  [Removed]

    30. Sections 228.106-4, 228.106-4-70, and 228.106-6 are removed.

PART 232--CONTRACT FINANCING

    31. Section 232.703-70 is added to read as follows:

232.703-70  Military construction appropriations act restriction.

    Annual military construction appropriations acts restrict the use 
of funds appropriated by the acts for payments under cost-plus-fixed-
fee contracts (see 216.306(c)).

PART 235--RESEARCH AND DEVELOPMENT CONTRACTING

    32. Section 235.7003 is amended by adding a new paragraph (c)(6) to 
read as follows:

235.7003  Reporting requirements.

* * * * *
    (c) * * *
    (6) Number of actions removed from the test due to inability to 
comply with RDSS/C procedures, with a brief description of the 
reasons(s) for the inability to comply.
* * * * *
    33. Section 235.7004-3(d) is amended by revising ``Alternate III'' 
to read ``Alternate II.''
    34. Section 235.7006, Exhibit--Research and Development Streamlined 
Contracting Format, Part I--The Schedule, Section H, Special Contract 
Requirements, is amended by revising the designation ``(H.4)*'' to read 
``(H.4)'' and by revising the address in (H.4) and by adding (H.6)* to 
read as follows:

235.7006--  The research and development streamlined contracting 
format.

Exhibit--Research and Development Streamlined Contracting format

Part I--The Schedule

    Section H * * *
    (H.4) * * * Defense Technical Information Center, Attn: 
Registration Section (DTIC-BCS), 8725 John J. Kingman Road, Suite 
0944, Fort Belvoir, VA 22060-6218,(703) 767-8273, or 1-800-CAL-DITC 
(225-3842), menu selection 2.
* * * * *
    *(H.6) (Insert nonstandard clause approved in accordance with 
235.7006(c), if applicable.)
* * * * *
    35. Section 235.7006, Exhibit--Research and Development Streamlined 
Contracting Format, Part II--Contract Clauses, and Part IV, 
Representations and Instructions, are revised to read as follows:

                                            Part II--Contract Clauses                                           
                                                                                                                
                                           Section I, Contract Clauses                                          
                                                                                                                
(I.1)............................  52.252-2...................................  Clauses Incorporated by         
                                                                                 Reference.                     
(I.2)............................  52.202-1...................................  Definitions.                    
(I.3)............................  Reserved...................................                                  
(I.4)............................  52.203-3...................................  Gratuities.                     
(I.5)............................  52.203-5...................................  Covenant Against Contingent     
                                                                                 Fees.                          
(I.6)............................  52.203-7...................................  Anti-Kickback Procedures.       
(I.7)............................  52.203-10..................................  Price or Fee Adjustment for     
                                                                                 Illegal or Improper Activity.  
                                                                                 (Except educational            
                                                                                 institutions.)                 
(I.8)............................  52.209-6...................................  Protecting the Government's     
                                                                                 Interest When Subcontracting   
                                                                                 with Contractors Debarred,     
                                                                                 Suspended, or Proposed for     
                                                                                 Debarment.                     
(I.9)............................  Reserved...................................                                  
(I.10)...........................  Reserved...................................                                  

[[Page 7745]]
                                                                                                                
(I.11)...........................  Reserved...................................                                  
(I.12)...........................  52.215-26..................................  Integrity of Unit Prices.       
(I.13)...........................  52.215-33..................................  Order of Precedence.            
(I.14)...........................  52.216-7...................................  Allowable Cost and Payment.     
                                                                                 (Modified in accordance with   
                                                                                 16.307 as applicable.)         
(I.15)...........................  Reserved...................................                                  
(I.16)...........................  Reserved...................................                                  
(I.17)...........................  Reserved...................................                                  
(I.18)...........................  Reserved...................................                                  
(I.19)...........................  52.222-3...................................  Convict Labor.                  
(I.20)...........................  52.222-26..................................  Equal Opportunity.              
(I.21)...........................  52.222-35..................................  Affirmative Action for Special  
                                                                                 Disabled and Vietnam Era       
                                                                                 Veterans.                      
(I.22)...........................  52.222-36..................................  Affirmative Action for          
                                                                                 Handicapped Workers.           
(I.23)...........................  52.222-37..................................  Employment Reports on Special   
                                                                                 Disabled Veterans and Veterans 
                                                                                 of the Vietnam Era.            
(I.24)...........................  52.223-6...................................  Drug-Free Workplace.            
(I.25)...........................  52.225-11..................................  Restrictions on Certain Foreign 
                                                                                 Purchases.                     
(I.26)...........................  52.227-1...................................  Authorization and Consent--     
                                                                                 Alternate I.                   
(I.27)...........................  52.227-2...................................  Notice and Assistance Regarding 
                                                                                 Patent and Copyright           
                                                                                 Infringement.                  
(I.28)...........................  52.228-7...................................  Insurance--Liability to Third   
                                                                                 Persons.                       
(I.29)...........................  52.232-9...................................  Limitation on Withholding of    
                                                                                 Payments.                      
(I.30)...........................  52.232-23..................................  Assignment of Claims.           
(I.31)...........................  52.232-25..................................  Prompt Payment.                 
(I.32)...........................  52.232-28..................................  Electronic Funds Transfer       
                                                                                 Payment Methods.               
(I.33)...........................  52.233-1...................................  Disputes.                       
(I.34)...........................  52.233-3...................................  Protest After Award--Alternate  
                                                                                 I.                             
(I.35)...........................  52.242-1...................................  Notice of Intent to Disallow    
                                                                                 Costs.                         
(I.36)...........................  52.242-13..................................  Bankruptcy.                     
(I.37)...........................  52.244-2...................................  Subcontracts (Cost-Reimbursement
                                                                                 and Letter Contracts) Alternate
                                                                                 I.                             
(I.38)...........................  52.244-5...................................  Competition in Subcontracting.  
(I.39)...........................  52.247-1...................................  Commercial Bill of Lading       
                                                                                 Notations.                     
(I.40)...........................  52.249-14..................................  Excusable Delays.               
(I.41)...........................  52.253-1...................................  Computer-Generated Forms.       
*(I.42)..........................  52.203-9...................................  Requirement for Certificate of  
                                                                                 Procurement Integrity-         
                                                                                 Modification.                  
*(I.43)..........................  52.203-12..................................  Limitation on Payments to       
                                                                                 Influence Certain Federal      
                                                                                 Transactions.                  
*(I.44)..........................  52.204-2...................................  Security Requirements.          
*(I.45)..........................  52.204-2...................................  Security Requirements-Alternate 
                                                                                 I. (For educational            
                                                                                 institutions.)                 
*(I.46)..........................  52.215-22..................................  Price Reduction for Defective   
                                                                                 Cost or Pricing Data.          
*(I.47)..........................  52.215-23..................................  Price Reduction for Defective   
                                                                                 Cost or Pricing Data           
                                                                                 Modications.                   
*(I.48)..........................  52.215-24..................................  Subcontractor Cost or Pricing   
                                                                                 Data.                          
*(I.49)..........................  52.215-25..................................  Subcontractor Cost or Pricing   
                                                                                 Data-Modifications.            
*(I.50)..........................  52.215-27..................................  Termination of Defined Benefit  
                                                                                 Pension Plans. (Except         
                                                                                 educational institutions.)     
*(I.51)..........................  52.215-31..................................  Waiver of Facilities Capital    
                                                                                 Cost of Money. (Except         
                                                                                 educational institutions.)     
*(I.52)..........................  52.215-39..................................  Reversion or Adjustment of Plans
                                                                                 for Postretirement Benefits    
                                                                                 Other than Pension (PRB).      
*(I.53)..........................  52.216-8...................................  Fixed Fee.                      
*(I.54)..........................  52.216-10..................................  Incentive Fee.                  
*(I.55)..........................  52.216-11..................................  Cost Contract--No Fee.          
*(I.56)..........................  52.216-11..................................  Cost Contract--No Fee-Alternate 
                                                                                 I.                             
*(I.57)..........................  52.216-12..................................  Cost-Sharing Contract--No Fee.  
*(I.58)..........................  52.216-12..................................  Cost-Sharing Contract--No Fee-  
                                                                                 Alternate I.                   
*(I.59)..........................  52.216-15..................................  Predetermined Indirect Cost     
                                                                                 Rates.                         
*(I.59A).........................  252.216-7002...............................  Alternate. (For educational     
                                                                                 institutions only.)            
*(I.60)..........................  52.219-6...................................  Notice of Total Small Business  
                                                                                 Set-Aside.                     
*(I.61)..........................  52.219-6...................................  Notice of Total Small Business  
                                                                                 Set-Aside--Alternate I.        
(I.63)...........................  Reserved...................................                                  
*(I.64)..........................  52.219-14..................................  Limitations on Subcontracting.  
*(I.65)..........................  52.219-16..................................  Liquidated Damages--Small       
                                                                                 Business Subcontracting Plan.  
(I.66)...........................  Reserved...................................                                  
*(I.67)..........................  52.222-1...................................  Notice to the Government of     
                                                                                 Labor Disputes.                
*(I.68)..........................  52.222-2...................................  Payment for Overtime Premiums.  
*(I.69)..........................  52.222-28..................................  Equal Opportunity Preaward      
                                                                                 Clearance of Subcontracts.     
*(I.70)..........................  52.223-2...................................  Clean Air and Water.            
*(I.71)..........................  52.223-3...................................  Hazardous Material              
                                                                                 Identification and Material    
                                                                                 Safety Data.                   
*(I.72)..........................  52.223-7...................................  Notice of Radioactive Materials 
                                                                                 (21 Days).                     
*(I.73)..........................  52.226-1...................................  Utilization of Indian           
                                                                                 Organizations and Indiane-Owned
                                                                                 Economic Enterprises.          
*(I.74)..........................  52.227-10..................................  Filing of Patent Applications-- 
                                                                                 Classified Subject Matter.     
*(I.75)..........................  52.227-11..................................  Patent Rights--Retention by the 
                                                                                 Contractor (Short Form).       
*(I.76)..........................  52.227-12..................................  Patent Rights--Retention by the 
                                                                                 Contractor (Long Form).        
*(I.77)..........................  52.227-13..................................  Patent Rights--Acquisition by   
                                                                                 the Government.                
*(I.78)..........................  52.228-7...................................  Insurance--Liability to Third   
                                                                                 Persons--Alternate I.          
*(I.79)..........................  52.228-7...................................  Insurance--Liability to Third   
                                                                                 Persons--Alternate II.         
*(I.80)..........................  52.229-8...................................  Taxes--Foreign Cost-            
                                                                                 Reimbursement Contracts.       
*(I.81)..........................  52.229-10..................................  State of New Mexico Gross       
                                                                                 Receipts and Compensating Tax. 
*(I.82)..........................  52.230-2...................................  Cost Accounting Standards.      
                                                                                 (Except if exempted.)          
*(I.83)..........................  52.230-3...................................  Disclosure and Consistency of   
                                                                                 Cost Accounting Practices.     
                                                                                 (Except if exempted.)          
*(I.84)..........................  52.230-5...................................  Administration of Cost          
                                                                                 Accounting Standards. (Except  
                                                                                 educational institutions.)     
*(I.85)..........................  52.232-17..................................  Interest.                       
*(I.86)..........................  52.232-20..................................  Limitation of Cost.             

[[Page 7746]]
                                                                                                                
*(I.87)..........................  52.232-22..................................  Limitation of Funds.            
*(I.88)..........................  52.232-23..................................  Assignment of Claims--Alternate 
                                                                                 I.                             
*(I.89)..........................  52.233-1...................................  Disputes--Alternate I.          
*(I.90)..........................  52.237-2...................................  Protection of Government        
                                                                                 Buildings, Equipment and       
                                                                                 Vegetation.                    
*(I.91)..........................  52.242-10..................................  F.O.B. Origin-Government Bills  
                                                                                 of Lading or Prepaid Postage.  
*(I.92)..........................  52.242-11..................................  F.O.B. Origin-Government Bills  
                                                                                 of Lading or Indicia Mail.     
*(I.93)..........................  52.242-12..................................  Report of Shipment (REPSHIP).   
*(I.94)..........................  52.243-2...................................  Changes--Cost-Reimbursement-    
                                                                                 Alternate V.                   
*(I.95)..........................  52.243-6...................................  Change Order Accounting.        
*(I.96)..........................  52.243-7...................................  Notification of Changes (30     
                                                                                 Calendar Days).                
*(I.97)..........................  52.245-5...................................  Government Property (Cost-      
                                                                                 Reimbursement, Time-and-       
                                                                                 Material, or Labor-Hour        
                                                                                 Contracts).                    
*(I.98)..........................  52.245-5...................................  Government Property (Cost-      
                                                                                 Reimbursement, Time-and-       
                                                                                 Material, or Labor-Hour        
                                                                                 Contracts-Alternate I. (For    
                                                                                 educational institutions and   
                                                                                 nonprofit organizations.)      
*(I.99)..........................  52.245-19..................................  Government Property Furnished   
                                                                                 ``As Is''.                     
*(I.100).........................  52.246-23..................................  Limitation of Liability.        
*(I.101).........................  52.246-24..................................  Limitation of Liability-High    
                                                                                 Value Items.                   
*(I.102).........................  52.246-24..................................  Limitation of Liability-High    
                                                                                 Value Items-Alternate I.       
*(I.103).........................  52.246-25..................................  Limitation of Liability-        
                                                                                 Services.                      
*(I.104).........................  52.247-63..................................  Preference for U.S.-Flag Air    
                                                                                 Carriers.                      
*(I.105).........................  52.247-66..................................  Returnable Cylinder.            
*(I.106).........................  52.249-5...................................  Termination for Convenience of  
                                                                                 the Government (Educational and
                                                                                 Other Nonprofit Institutions). 
*(I.107).........................  52.249-6...................................  Termination (Cost-              
                                                                                 Reimbursement).                
*(I.108).........................  52.251-1...................................  Government Supply Sources.      
*(I.109).........................  252.201-7000...............................  Contracting Officer's           
                                                                                 Representative.                
*(I.110).........................  252.203-7001...............................  Special Prohibition on          
                                                                                 Employment.                    
*(I.111).........................  Reserved...................................                                  
*(I.112).........................  Reserved...................................                                  
*(I.113).........................  52.204-7003................................  Control of Government Personnel 
                                                                                 Work Product.                  
*(I.114).........................  252.209-7000...............................  Acquisition from Subcontractors 
                                                                                 Subject to On-Site Inspection  
                                                                                 under the Intermediate-Range   
                                                                                 Nuclear Forces (INF) Treaty.   
*(I.115).........................  252.225-7012...............................  Preference for Certain Domestic 
                                                                                 Commodities.                   
*(I.116).........................  252.225-7031...............................  Secondary Arab Boycott of       
                                                                                 Israel.                        
*(I.117).........................  Reserved...................................                                  
*(I.118).........................  Reserved...................................                                  
*(I.119).........................  Reserved...................................                                  
*(I.120).........................  252.227-7030...............................  Technical Data-Withholding of   
                                                                                 Payment.                       
*(I.121).........................  252.227-7037...............................  Validation of Restrictive       
                                                                                 Markings on Technical Data.    
*(I.122).........................  252.231-7000...............................  Supplemental Cost Principles.   
*(I.123).........................  252.232-7006...............................  Reduction or Suspension of      
                                                                                 Contract Payments Upon Finding 
                                                                                 of Fraud.                      
*(I.124).........................  252.242-7000...............................  Postaward Conference.           
*(I.125).........................  Reserved...................................                                  
*(I.126).........................  252.247-7023...............................  Transportation of Supplies by   
                                                                                 Sea.                           
*(I.127).........................  252.203-7000...............................  Statutory Prohibition on        
                                                                                 Compensation to Former         
                                                                                 Department of Defense          
                                                                                 Employees.                     
*(I.128).........................  252.203-7002...............................  Display of DoD Hotline Poster.  
*(I.129).........................  252.204-7000...............................  Disclosure of Information.      
*(I.130).........................  252.204-7002...............................  Payment for Subline Items Not   
                                                                                 Separately Priced.             
*(I.131).........................  252.205-7000...............................  Provision of Information to     
                                                                                 Cooperative Agreement Holders. 
*(I.132).........................  252.215-7000...............................  Pricing Adjustments.            
*(I.133).........................  252.215-7002...............................  Cost Estimating System          
                                                                                 Requirements.                  
*(I.134).........................  252.219-7001...............................  Notice of Partial Small Business
                                                                                 Set-Aside with Preferential    
                                                                                 Consideration for Small        
                                                                                 Disadvantaged Business         
                                                                                 Concerns.                      
*(I.135).........................  252.219-7002...............................  Notice of Small Disadvantaged   
                                                                                 Business Set-Aside.            
*(I.136).........................  252.219-7003...............................  Small Business and Small        
                                                                                 Disadvantaged Business         
                                                                                 Subcontracting Plan (DoD       
                                                                                 Contracts).                    
*(I.137).........................  252.219-7004...............................  Small Business and Small        
                                                                                 Disadvantaged Business         
                                                                                 Subcontracting Plan (Test      
                                                                                 Program).                      
*(I.138).........................  252.219-7005...............................  Incentive for Subcontracting    
                                                                                 with Small Businesses, Small   
                                                                                 Disadvantaged Businesses,      
                                                                                 Historically Black Colleges and
                                                                                 Universities and Minority      
                                                                                 Institutions. (. . . To be     
                                                                                 negotiated ________ %.)        
*(I.139).........................  252.219-7005...............................  Incentive for Subcontracting    
                                                                                 with Small Businesses, Small   
                                                                                 Disadvantaged Businesses,      
                                                                                 Historically Black Colleges and
                                                                                 Universities and Minority      
                                                                                 Institutions-Alternate I. (. . 
                                                                                 . To be negotiated ________ %.)
*(I.140).........................  252.219-7006...............................  Notice of Evaluation Preference 
                                                                                 for Small Disadvantaged        
                                                                                 Business Concerns.             
*(I.141).........................  252.223-7001...............................  Hazard Warning Labels.          
*(I.142).........................  252.223-7002...............................  Safety Precautions for          
                                                                                 Ammunitions and Explosives.    
*(I.143).........................  252.223-7003...............................  Change in Place of Performance- 
                                                                                 Ammunition and Explosives.     
*(I.144).........................  252.223-7004...............................  Drug-Free Work Force.           
*(I.145).........................  252.225-7014...............................  Preference for Domestic         
                                                                                 Specialty Metals.              
*(I.146).........................  252.225-7016...............................  Restriction on Acquisition of   
                                                                                 Antifriction Bearings.         
*(I.147).........................  252.225-7025...............................  Foregin Source Restrictions.    
*(I.148).........................  252.225-7026...............................  Reporting of Contract Outside   
                                                                                 the United States.             
*(I.149).........................  252.225-7032...............................  Waiver of United Kingdom Levies.
*(I.150).........................  252.226-7000...............................  Notice of Historically Black    
                                                                                 College or University and      
                                                                                 Minority Institution Set-Aside.
*(I.151).........................  252.227-7026...............................  Deferred Delivery of Technical  
                                                                                 Data or Computer Software.     
*(I.152).........................  252.227-7027...............................  Deferred Ordering of Technical  
                                                                                 Data or Computer Software.     
(I.153)..........................  Reserved...................................                                  
*(I.154).........................  252.227-7034...............................  Patent--Subcontracts.           

[[Page 7747]]
                                                                                                                
*(I.155).........................  252.227-7036...............................  Certification of Technical Data 
                                                                                 Conformity.                    
*(I.156).........................  252.227-7039...............................  Patents--Reporting of Subject   
                                                                                 Inventions.                    
(I.157)..........................  Reserved...................................                                  
*(I.158).........................  252.232-7000...............................  Advance Payment Pool. (For      
                                                                                 educational institutions and   
                                                                                 nonprofit organizations.)      
*(I.159).........................  252.233-7000...............................  Certification of Claims and     
                                                                                 Requests for Adjustment or     
                                                                                 Relief.                        
*(I.160).........................  252.235-7002...............................  Animal Welfare.                 
*(I.161).........................  252.242-7002...............................  Submission of Commercial Freight
                                                                                 Bills for Audit.               
*(I.162).........................  252.242-7003...............................  Application for U.S. Government 
                                                                                 Shipping Documentation/        
                                                                                 Instructions.                  
*(I.163).........................  252.242-7004...............................  Material Management and         
                                                                                 Accounting System.             
*(I.164).........................  252.245-7001...............................  Reports of Government Property. 
*(I.165).........................  252.247-7024...............................  Notification of Transportation  
                                                                                 of Supplies by Sea.            
*(I.166).........................  252.249-7001...............................  Notification of Substantial     
                                                                                 Impact on Employment.          
*(I.167).........................  252.251-7000...............................  Ordering From Government Supply 
                                                                                 Sources.                       
*(I.168).........................  252.223-7006...............................  Prohibition on Disposal of Toxic
                                                                                 and Hazardous Materials.       
*(I.169).........................  252.249-7002...............................  Notification of Program         
                                                                                 Termination or Reduction.      
(I.170)..........................  52.204-4...................................  Printing/Copying Double-Sided on
                                                                                 Recycled Paper.                
*(I.171).........................  52.208-8...................................  Helium Requirement Forecast and 
                                                                                 Required Sources for Helium.   
(I.172)..........................  52.215-2...................................  Audit and Records--Negotiation. 
*(I.173).........................  52.215-2...................................  Audit and Records--Negotiation, 
                                                                                 Alternate II.                  
(I.174)..........................  52.215-40..................................  Notification of Ownership       
                                                                                 Changes.                       
*(I.175).........................  52.215-42..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other Than 
                                                                                 Cost or Pricing Data--         
                                                                                 Modifications.                 
*(I.176).........................  52.215-42..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other Than 
                                                                                 Cost or Pricing Data--         
                                                                                 Modifications, Alternate II.   
*(I.177).........................  52.215-42..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other Than 
                                                                                 Cost or Pricing Data--         
                                                                                 Modifications, Alternate III.  
(I.178)..............
FR Doc. 96-4480 Defense Federal Acquisition Regulation Supplement; Miscellaneous Amendments
............  52.219-8...................................  Utilization of Small, Small     
                                                                                 Disadvantaged and Women-Owned  
                                                                                 Small Business Concerns.       
*(I.179).........................  52.219-9...................................  Small, Small Disadvantaged and  
                                                                                 Women-Owned Small Business     
                                                                                 Subcontracting Plan.           
*(I.180).........................  52.242-3...................................  Penalties for Unallowable Costs.
(I.181)..........................  52.242-4...................................  Certification of Indirect Costs.
(I.182)..........................  52.244-6...................................  Subcontracts for Commercial     
                                                                                 Items and Commercial           
                                                                                 Components.                    
*(I.183).........................  52.247-67..................................  Submission of Commercial        
                                                                                 Transportation Bills to the    
                                                                                 General Services Administration
                                                                                 for Audit.                     
(I.184)..........................  52.223-14..................................  Toxic Chemical Release          
                                                                                 Reporting.                     
(I.185)..........................  252.235-7010...............................  Acknowledgement of Support and  
                                                                                 Disclaimer.                    
(I.186)..........................  252.235-7011...............................  Final Scientific or Technical   
                                                                                 Report.                        
*(I.187).........................  252.227-7013...............................  Rights in Technical Data--      
                                                                                 Noncommercial Items.           
*(I.188).........................  252.227-7013...............................  Rights in Technical Data--      
                                                                                 Noncommercial Items, Alternate 
                                                                                 I.                             
*(I.189).........................  252.227-7014...............................  Rights in Noncommercial Computer
                                                                                 Software and Noncommercial     
                                                                                 Computer Software              
                                                                                 Documentation.                 
*(I.190).........................  252.227-7014...............................  Rights in Nocommercial Computer 
                                                                                 Software and Noncommercial     
                                                                                 Computer Software              
                                                                                 Documentation, Alternate I.    
*(I.191).........................  252.227-7015...............................  Technical Data--Commercial      
                                                                                 Items.                         
*(I.192).........................  252.227-7016...............................  Rights in Bid or Proposal       
                                                                                 Information.                   
*(I.193).........................  252.227-7018...............................  Rights in Noncommercial         
                                                                                 Technical Data and Computer    
                                                                                 Software--Small Business       
                                                                                 Innovation Research Program.   
*(I.194).........................  252.227-7018...............................  Rights in Noncommercial         
                                                                                 Technical Data and Computer    
                                                                                 Software--Small Business       
                                                                                 Innovation Research Program,   
                                                                                 Alternate I.                   
*(I.195).........................  252.227-7019...............................  Validation of Asserted          
                                                                                 Restrictions--Computer         
                                                                                 Software.                      
*(I.196).........................  252.227-7025...............................  Limitations on the Use or       
                                                                                 Disclosure of Government-      
                                                                                 Furnished Information Marked   
                                                                                 with Restrictive Legends.      
*(I.197).........................  252.209-7005...............................  Military Recruiting on Campus   
                                                                                 (For educational institutions  
                                                                                 only.)                         
                                                                                                                
.                                                                                                               
                          *         *         *         *         *         *         *                         
                                    Part IV--Representations and Instructions                                   
                                                                                                                
             Section K. Representations, Certifications and Other Statements of Offerors or Quoters             
  The following solicitation provisions require representations, certifications or the submission of other      
information by offerors. They are mandatory, and are included by reference. Full text copies of these provisions
are available from the Contracting Officer and must be completed and certified before contract award.           
                                                                                                                
(K.1)............................  52.203-4...................................  Contingent Fee Representation   
                                                                                 and Agreement.                 
(K.2)............................  52.203-8...................................  Requirement for Certificate of  
                                                                                 Procurement Integrity-Alternate
                                                                                 I.                             
(K.3)............................  52.203-11..................................  Certification and Disclosure    
                                                                                 Regarding Payments to Influence
                                                                                 Certain Federal Transactions.  
(K.4)............................  52.204-3...................................  Taxpayer Identification.        
(K.5)............................  52.209-5...................................  Certification Regarding         
                                                                                 Debarment, Suspension, Proposed
                                                                                 Debarment, and Other           
                                                                                 Responsibility Matters.        
(K.6)............................  52.215-6...................................  Type of Business Organization.  
(K.7)............................  52.215-11..................................  Authorized Negotiators.         
(K.8)............................  52.215-20..................................  Place of Performance.           
(K.9)............................  52.215-30..................................  Facilities Capital Cost of Money
                                                                                 (Except educational            
                                                                                 institutions.)                 
(K.10)...........................  Reserved...................................                                  
(K.11)...........................  Reserved...................................                                  
(K.12)...........................  Reserved...................................                                  
(K.13)...........................  52.222-21..................................  Certification of Nonsegregated  
                                                                                 Facilities.                    
(K.14)...........................  52.222-22..................................  Previous Contracts and          
                                                                                 Compliance Reports.            
(K.15)...........................  52.222-25..................................  Affirmative Action Compliance.  

[[Page 7748]]
                                                                                                                
(K.16)...........................  52.223-1...................................  Clean Air and Water             
                                                                                 Certification.                 
(K.17)...........................  52.223-5...................................  Certification Regarding a Drug- 
                                                                                 Free Workplace.                
(K.18)...........................  52.227-6...................................  Royalty Information.            
(K.19)...........................  52.230-1...................................  Cost Accounting Standards       
                                                                                 Notices and Certification.     
(K.20)...........................  Reserved...................................                                  
(K.21)...........................  252.209-7002...............................  Disclosure of Ownership or      
                                                                                 Control by a Foreign           
                                                                                 Government.                    
(K.22)...........................  252.219-7000...............................  Small Disadvantaged Business    
                                                                                 Concern Representation (DOD    
                                                                                 Contracts).                    
(K.23)...........................  Reserved...................................                                  
(K.24)...........................  Reserved...................................                                  
(K.25)...........................  252.226-7001...............................  Hostirically Black College or   
                                                                                 University and Minority        
                                                                                 Institution Certification.     
(K.26)...........................  Reserved...................................                                  
(K.27)...........................  252.247-7022...............................  Representation of Extent of     
                                                                                 Transportation by Sea.         
(K.28)...........................  52.204-5...................................  Women-Owned Business.           
(K.29)...........................  252.209-7..................................  Organizational Conflicts of     
                                                                                 Interest Certificate--Marketing
                                                                                 Consultants.                   
(K.30)...........................  252.219-1..................................  Small Business Program          
                                                                                 Representation.                
(K.31)...........................  252.223-13.................................  Certification of Toxic Chemical 
                                                                                 Release Reporting.             
(K.32)...........................  252.209-7001...............................  Disclosure of Ownership or      
                                                                                 Control by the Government of a 
                                                                                 Terrorist Country.             
(K.33)...........................  252.209-7003...............................  Disclosure of Commercial        
                                                                                 Transactions with the          
                                                                                 Government of a Terrorist      
                                                                                 Country.                       
(K.34)...........................  252.209-7004...............................  Reporting of Commercial         
                                                                                 Transactions with the          
                                                                                 Government of a Terrorist      
                                                                                 Country.                       
(K.35)...........................  252.227-7017...............................  Identification and Assertion of 
                                                                                 Use, Release, or Disclosure    
                                                                                 Restrictions.                  
(K.36)...........................  252.227-7028...............................  Technical Data or Computer      
                                                                                 Software Previously Delivered  
                                                                                 to the Government.             
                                                                                                                
                     Section L. Instructions, Conditions, and Notices to Offerors or Quoters                    
                                                                                                                
(L.1)............................  52.252-1...................................  Solicitation Provisions         
                                                                                 Incorporated by Reference.     
(L.2)............................  Reserved...................................                                  
(L.3)............................  52.210-2...................................  Availability of Specifications  
                                                                                 and Standards Listed in the DoD
                                                                                 Index of Specifications and    
                                                                                 Standards (DODISS) and         
                                                                                 Descriptions Listed in DoD     
                                                                                 5010.12-L (Deviation).         
(L.4)............................  52.215-5...................................  Solicitation Definitions.       
(L.5)............................  52.215-7...................................  Unnecessarily Elaborate         
                                                                                 Proposals or Quotations.       
(L.6)............................  52.215-8...................................  Amendments to Solicitations.    
(L.7)............................  52.215-9...................................  Submission of Offers.           
(L.8)............................  52.215-10..................................  Late Submissions, Modifications,
                                                                                 and Withdrawals of Proposals.  
(L.9)............................  52.215-12..................................  Restriction on Disclosure and   
                                                                                 Use of Data.                   
(L.10)...........................  52.215-13..................................  Preparation of Offers.          
(L.11)...........................  52.215-14..................................  Explanation to Prospective      
                                                                                 Offerors.                      
(L.12)...........................  52.215-15..................................  Failure to Submit Offer.        
(L.13)...........................  52.215-16..................................  Contract Award.                 
(L.14)...........................  Reserved...................................                                  
(L.15)...........................  52.216-1...................................  Type of Contract (See           
                                                                                 235.7006(d)(B.1)).             
(L.16)...........................  52.222-24..................................  Preaward On-Site Equal          
                                                                                 Opportunity Compliance Review. 
(L.17)...........................  52.228-6...................................  Insurance-Immunity from Tort    
                                                                                 Liability.                     
(L.18)...........................  52.233-2...................................  Service of Protest (See         
                                                                                 235.7006(d)(A.1)(xvii)).       
(L.19)...........................  52.237-1...................................  Site Visit.                     
(L.20)...........................  52.252-5...................................  Authorized Deviations in        
                                                                                 Provisions.                    
(L.21)...........................  252.204-7001...............................  Commercial and Government Entity
                                                                                 (CAGE) Code Reporting.         
(L.22)...........................  Reserved...................................                                  
(L.23)...........................  52.215-16..................................  Contract Award--Alternate II.   
*(L.24)..........................  52.215-41..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other than 
                                                                                 Cost or Pricing Data.          
*(L.25)..........................  52.215-41..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other than 
                                                                                 Cost or Pricing Data, Alternate
                                                                                 I.                             
*(L.26)..........................  52.215-41..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other than 
                                                                                 Cost or Pricing Data, Alternate
                                                                                 II.                            
*(L.27)..........................  52.215-41..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other than 
                                                                                 Cost or Pricing Data, Alternate
                                                                                 III.                           
*(L.28)..........................  52.215-41..................................  Requirements for Cost or Pricing
                                                                                 Data or Information Other than 
                                                                                 Cost or Pricing Data, Alternate
                                                                                 IV.                            
(L.29 through L.100)  Reserved..................................................................................
(L.101) Government-Furnished Property.                                                                          
                                                                                                                
  No material, labor, or facilities will be furnished by the Government unless provided for in the solicitation.
                                                                                                                
(L.102) Proposal Preparation and Submission Instructions........................................................
                                                                                                                

[[Page 7749]]

    (i) Page limitation, format.
    (A) A proposal shall be prepared in separate volumes with the 
page limit and number of copies specified below. The table of 
contents and tabs are exempt from the page limits. No cross-
referencing between volumes for essential information is permitted 
except where specifically set forth herein. The following volumes of 
material will be submitted:

------------------------------------------------------------------------
                                                                 Maximum
             Title                           Copies                page 
                                                                  limits
------------------------------------------------------------------------
Cost...........................  As specified in solicitation        *50
                                  summary.                              
Technical......................  As specified in solicitation        100
                                  summary.                              
------------------------------------------------------------------------
*The 50-page cost proposal is a goal not a limit. The Contractor may use
  additional pages if necessary to comply with public law.              

    (B) Any technical proposal pages submitted which exceed the page 
limitations set forth above will not be read or evaluated. Proposal 
pages failing to meet paragraph D format will not be read or 
evaluated.
    (C) No program cost data or cross-reference to the cost proposal 
will be included in any other volume.
    (D) Format of the above proposal volumes shall be as follows:
    (1) Proposals will be prepared on 8\1/2\ x 11 inch paper except 
for foldouts used for charts, tables, or diagrams, which may not 
exceed 11 x 17 inches. Foldouts will not be used for text. Pages 
will have a one inch margin.
    (2) A page is defined as one face of a sheet of paper containing 
information. Two pages may be printed on one sheet.
    (3) Type size will be no smaller than 10 point character height 
(vertical size) and no more than an average 12 characters per inch. 
Use of type-setting techniques to reduce type size below 10 points 
or to increase characters beyond 12 per inch is not permitted. Such 
techniques are construed as a deliberate attempt to circumvent the 
intent of page limitations set forth above.
    (4) Proposal must lie flat when open, elaborate binding is not 
desirable.
    (5) No models, mockups or video tapes will be accepted.
    (6) Technical proposals will be prepared in the same sequence as 
the statement of work.
    (ii) Content.
    All proposals must be complete and respond directly to the 
requirements of the solicitation. The factors and subfactors listed 
in Section M of the solicitation shall be addressed. Cost and 
supporting data shall be included only in the cost volume. All other 
information shall be included in the technical volume.
* * * * *

PART 236--CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS

    36. Section 236.201 is amended by revising paragraph (a) to read 
as follows:

236.201  Evaluation of contractor performance.

    (a) Preparation of performance evaluation reports. Use DD Form 
2626, Performance Evaluation (Construction), instead of SF 1420.
* * * * *
    37. Section 236.204 is added to read as follows:

236.204  Disclosure of the magnitude of construction projects.

    Additional price ranges are--
    (i) Between $10,000,000 and $25,000,000;
    (ii) Between $25,000,000 and $100,000,000;
    (iii) Between $100,000,000 and $250,000,000;
    (iv) Between $250,000,000 and $500,000,000; and
    (v) Over $500,000,000.
    38. Section 236.271 is revised to read as follows:

236.271  Cost-plus-fixed-fee contracts.

    Annual military construction appropriations acts restrict the use 
of cost-plus-fixed-fee contracts (see 216.306(c)).
    39. Section 236.604 is amended by adding paragraph (a) introductory 
text to read as follows:

236.604  Performance evaluation.

    (a) Preparation of performance reports. Use DD Form 2631, 
Performance Evaluation (Architect-Engineer), instead of SF 1421.
    (2) * * *
* * * * *

PART 242--CONTRACT ADMINISTRATION

    40. Section 242.203 is amended by removing at the end of paragraph 
(a)(i)(P) the word ``and''; by removing at the end of paragraph 
(a)(i)(Q) the period and adding a semicolon and the word ``and''; by 
revising paragraph (a)(ii); by removing paragraph (a)(iii); and by 
redesignating paragraphs (a)(iv) and (a)(v) as (a)(iii) and (a)(iv) 
respectively. The revision reads as follows:

242.203  Retention of contract administration.

    (a)(i) * * *
    (ii) Contract administration functions for base, post, camp, and 
station contracts on a military installation are normally the 
responsibility of the installation or tenant commander. However, the 
Defense Contract Management Command (DCMC) shall, upon request of the 
military department, and subject to prior agreement, perform contract 
administration services on a military installation.
* * * * *

PART 246--QUALITY ASSURANCE

    41. Section 246.770-2 is amended by redesignating paragraphs (b) 
and (c) as paragraphs (c) and (d) respectively; by adding a new 
paragraph (b); and by revising the newly designated paragraph (c) to 
read as follows:

246.770-2  Policy.

    (a) * * *
    (b) Contracting officers and program managers shall consider the 
following when developing and negotiating weapon system warranty 
provisions:
    (1) Warranties may not be appropriate in all situations, and a 
waiver should be sought if a warranty would not be cost-effective or 
would otherwise be inconsistent with the national defense. In drafting 
warranty provisions, the drafters must ensure they understand the 
planned operational, maintenance, and supply concepts of the weapon 
system to be fielded, and must structure a warranty that matches those 
concepts. A warranty plan should be prepared in consonance with 
development of the warranty provision early in the weapon system's life 
cycle. The plan should contain program warranty strategy, terms of the 
warranty, administration and enforcement requirements, and should be 
coordinated with the user and support activities.
    (2) A cost/benefit analysis must be accomplished in support of each 
warranty (see 246.770-7). The cost/benefit analysis compares all costs 
associated with the warranty to the expected benefits. An estimate 
shall be made of the likelihood of defects and the estimated cost of 
correcting such defects. Also, if substantive changes are required to 
the planned operational, maintenance, or supply concepts, any increased 
costs should be weighed against the expected benefits in deciding 
whether a warranty is cost-effective.
    (3) The Warranty Guidebook prepared by the Defense Systems 
Management College, Fort Belvoir, VA 22060-5426, is a valuable 
reference that can assist in the development, negotiation, and 
administration of an effective weapon system warranty.
    (c) Contracting officers may require warranties that provide 
greater coverage and remedies than specified in paragraph (a) of this 
subsection.
* * * * *

[[Page 7750]]

    42. Section 246.770-8 is amended by revising the introductory text 
of paragraph (a); by removing paragraph (b)(2); by redesignating 
paragraph (b)(3) as paragraph (b)(2), and by revising the introductory 
text of paragraphs (c) and (c)(2). The revised text reads as follows:

246.770-8  Waiver and notification procedures.

    (a) The Secretary of Defense has delegated waiver authority within 
the limits specified in 10 U.S.C. 2403. The waiving authority for the 
defense agencies is the Under Secretary of Defense (Acquisition and 
Technology). Submit defense agency waiver requests to the Director, 
Defense Procurement, for processing. The waiving authority for the 
military departments is the Secretary of the department with authority 
to redelegate no lower than an Assistant Secretary. The waiving 
authority may waive one or more of the weapon system warranties 
required by 246.770-2 if--
* * * * *
    (c) Departments and agencies shall issue procedures for processing 
waivers and notifications to Congress.
    (1) * * *
    (2) Notifications shall include--
* * * * *

PART 252--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    43. Section 252.209-7005 is amended by revising the clause date to 
read ``(FEB 1996)''; and by revising paragraph (b) to read as follows:

252.209-7005  Military recruiting on campus.

* * * * *
    (b) General. An institution of higher education that has been 
determined, using procedures established by the Secretary of Defense 
at 32 CFR part 216: (1) to have a policy of denying, or (2) to 
effectively prevent the Secretary of Defense from obtaining for 
military recruiting purposes, entry to such institution's campuses, 
access to students on those campuses, or access to directory 
information pertaining to its students, is ineligible for contract 
award and payments under existing contracts. In addition, the 
Government shall terminate this contract for the Contractor's 
material failure to comply with the terms and conditions of award.
* * * * *
    44. Section 252.217-7027 is revised to read as follows:

252.217-7027  Contract Definitization.

    As prescribed in 217.7406(b), use the following clause:

CONTRACT DEFINITIZATION (FEB 1996)

    (a) A ______(insert specific type of contract action) is 
contemplated. The Contractor agrees to begin promptly negotiating 
with the Contracting Officer the terms of a definitive contract that 
will include (1) all clauses required by the Federal Acquisition 
Regulation (FAR) on the date of execution of the underfinitized 
contract action, (2) all clauses required by law on the date of 
execution of the definitive contract action, and (3) any other 
mutually agreeable clauses, terms, and conditions. The Contractor 
agrees to submit a ______(insert type of proposal; e.g., fixed-price 
or cost-and-fee) proposal and cost or pricing data supporting its 
proposal.
    (b) The schedule for definitizing this contract is as follows 
(insert target date for definitization of the contract action and 
dates for submission of proposed, beginning of negotiations, and, if 
appropriate, submission of the make-or-buy and subcontracting plans 
and cost or pricing data).

----------------------------------------------------------------------

----------------------------------------------------------------------

----------------------------------------------------------------------

----------------------------------------------------------------------

    (c) If agreement on a definitive contract action to supersede 
this undefinitized contract action is not reached by the target date 
in paragraph (b) of this clause, or within any extension of it 
granted by the Contracting Officer, the Contracting Officer may, 
with the approval of the head of the contracting activity, determine 
a reasonable price or fee in accordance with subpart 15.8 and part 
31 of the FAR, subject to Contractor appeal as provided in the 
Disputes clause. In any event, the Contractor shall proceed with 
completion of the contract, subject only to the Limitation of 
Government Liability clause.
    (1) After the Contracting Officer's determination of price or 
fee, the contract shall be governed by--
    (i) All clauses required by the FAR on the date of execution of 
this underfinitized contract action for either fixed-price or cost-
reimbursement contracts, as determined by the Contracting Officer 
under this paragraph (c);
    (ii) All clauses required by law as of the date of the 
Contracting Officer's determination; and
    (iii) Any other clauses, terms, and conditions mutually agreed 
upon.
    (2) To the extent consistent with paragraph (c)(1) of this 
clause, all clauses, terms, and conditions included in this 
undefinitized contract action shall continue in effect, except those 
that by their nature apply only to an undefinitized contract action.
    (d) The definitive contract resulting from this undefinitized 
contract action will include a negotiated ____________________ 
(insert ``cost/price ceiling'' or ``firm-fixed price'') in no event 
to exceed ____________________ (insert the not-to-exceed amount).

(End of clause)

    45. Section 252.223-7007 is added to read as follows:

252.223-7007  Safeguarding Sensitive Conventional Arms, Ammunition, and 
Explosives.

    As prescribed in 223.7203, use the following clause:

Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives 
(Feb. 1996)

    (a) Definition.
    ``Arms, ammunition, and explosives (AA&E),'' as used in this 
clause, means those items within the scope (chapter 1, paragraph B) 
of DoD 5100.76-M, Physical Security of Sensitive Conventional Arms, 
Ammunition, and Explosives.
    (b) The requirements of DoD 5100.76-M apply to the following 
items of AA&E being developed, produced, manufactured, or purchased 
for the Government, or provided to the Contractor as Government-
furnished property under this contract:

------------------------------------------------------------------------
                                                  National              
                 Nomenclature                      stock     Sensitivity
                                                   number      category 
------------------------------------------------------------------------
                                                                        
                                                                        
------------------------------------------------------------------------

    (c) The Contractor shall comply with the requirements of DoD 
5100.76-M, as specified in the statement of work. The edition of DoD 
5100.76-M in effect on the date of issuance of the solicitation for 
this contract shall apply.
    (d) The Contractor shall allow representatives of the Defense 
Investigative Service (DIS), and representatives of other 
appropriate offices of the Government, access at all reasonable 
times into its facilities and those of its subcontractors, for the 
purpose of performing surveys, inspections, and investigations 
necessary to review compliance with the physical security standards 
applicable to this contract.
    (e) The Contractor shall notify the cognizant DIS field office 
of any subcontract involving AA&E within 10 days after award of the 
subcontract.
    (f) The Contractor shall ensure that the requirements of this 
clause are included in all subcontracts, at every tier--
    (1) For the development, production, manufacture, or purchase of 
AA&E; or
    (2) When AA&E will be provided to the subcontractor as 
Government-furnished property.
    (g) Nothing in this clause shall relieve the Contractor of its 
responsibility for complying with applicable Federal, state, and 
local laws, ordinances, codes, and regulations (including 
requirements for obtaining licenses and permits) in connection with 
the performance of this contract.

(End of clause)

252.228-7006  [Removed and Reserved]

    46. Section 252.228-7006 is removed and reserved.

252.232-7004  [Amended]

    47. Section 252.232-7004 is amended by revising the clause date to 
read ``(FEB 1996)'' and by revising in paragraph (a), in the 
parenthetical phrase, the word 

[[Page 7751]]
``excepting'' to read ``including'' and the phrase ``Undefinitized 
Actions'' to read ``Undefinitized Contract Actions.''

PART 253--FORMS

    48. Section 253.213-70 is amended by revising paragraph (e)(14) to 
read as follows:

253.213-70--  Instructions for completion of DD Form 1155

* * * * *
    (e) * * *
    14  SHIP TO--
    If a single ship-to point applies to the entire order, enter the 
name and address of that point in this block and a DODAAD code in 
the code block. For FMS shipments, enter the MAPAD code in the code 
block and an instruction for the contractor to contact the 
transportation office of the administering activity to obtain a name 
and shipping address. Enter multiple ship-to points in the schedule 
and mark this block, ``See Schedule.''
* * * * *
    49. At the end of Part 253 ``253.303-2626, Performance Evaluation 
(construction)'' and ``253.303-2631, Performance Evaluation (Architect-
Engineer)'' are added to the DFARS Form List.

Appendix G to Chapter 2 [Amended]

    50-51. Appendix G to Chapter 2, Part 3, Navy Activity Address 
Numbers, is amended by revising activity address numbers N00019, 
N00023, N00024, N00030, N00039, N00104, N00383, and by adding activity 
address number N00391 to read as follows:

Appendix G--Activity Address Numbers

* * * * *

PART 3--NAVY ACTIVITY ADDRESS NUMBERS

* * * * *
N00019--Naval Air Systems Command
EF*, GU*--1421 Jefferson Davis Highway
EF0-9--Arlington, VA 22243-5120
* * * * *
N00023--Naval Supply Systems Command
4J*, L5*--1931 Jefferson Davis Highway
4J0-9--Arlington, VA 22241-5360
N00024--Naval Sea Systems Command
EH*, U0*--2531 Jefferson Davis Highway
EH0-9--Arlington, VA 22242-5160
* * * * *
N00030--Strategic Systems Programs
EK*--1931 Jefferson Davis Highway
EK0-9--Arlington, VA 22241-5362
* * * * *
N00039--Space and Naval Warfare Systems Command
NS*--2451 Crystal Drive
NS0-9--Arlington, VA 22245-5200
* * * * *
N00104--Naval Inventory Control Point
EP--5450 Carlisle Pike
EQ--Box 2020, Mechanicsburg, PA 17055-0788
* * * * *
N00383--Naval Inventory Control Point
GB--700 Robbins Avenue
GC--Philadelphia, PA 19111-5098
* * * * *
N00391--Naval Inventory Control Point
EP, EQ,--700 Robbins Avenue
GB, GC--Philadelphia, PA 19111-5098
* * * * *
    52. Appendix G to Chapter 2, Part 4, Marine Corps Activity Address 
Numbers, is amended by revising activity number M67854 to read as 
follows:

PART 4--MARINE CORPS ACTIVITY ADDRESS NUMBERS

* * * * *
M67854--Marine Corps Systems Command
(MAJ00027)--2033 Barnett Ave, Suite 315
MU6-9--Quantico, VA 22134-5010
* * * * *
    53. Appendix G, Chapter 2, Part 10, Miscellaneous Defense 
Activities Activity Address Numbers, is amended by revising activity 
number MDA946 to read as follows:

PART 10--MISCELLANEOUS DEFENSE ACTIVITIES ACTIVITY ADDRESS NUMBERS

* * * * *
MDA946--Real Estate and Facilities Directorate, Washington headquarters 
Services, 1155 Defense Pentagon, room 3C345, Washington, DC 20301-1155
* * * * *
[FR Doc. 96-4480 Filed 2-28-96; 8:45 am]
BILLING CODE 5000-04-M

Complete official Federal Register PDF

FR Doc. 96-4441 National Emission Standards for Hazardous Air Pollutants for Source Categories: Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry and Other Processes Subject to the Negotiated Regulation for Equipment Leaks
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7716-7718]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4441]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 63

[AD-FRL-5431-2]
RIN 2060-AC19

National Emission Standards for Hazardous Air Pollutants for 
Source Categories: Organic Hazardous Air Pollutants From the Synthetic 
Organic Chemical Manufacturing Industry and Other Processes Subject to 
the Negotiated Regulation for Equipment Leaks

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: On April 10, 1995, the EPA amended certain portions of the 
``National Emission Standards for Hazardous Air Pollutants for Source 
Categories: Organic Hazardous Air Pollutants from the Synthetic Organic 
Chemical Manufacturing Industry and Other Processes Subject to the 
Negotiated Regulation for Equipment Leaks.'' This rule is commonly 
known as the Hazardous Organic NESHAP or the HON. In that action, the 
EPA revised the rule to provide a deferral of HON requirements for 
source owners or operators who wish to make an area source 
certification and to establish minimum documentation requirements. This 
action revises the date for submittal of those area source 
certifications and clarifies the wording of the documentation 
requirements. This action is being taken because the EPA has learned 
that sufficient time was not provided to prepare the certifications and 
that some confusion exists regarding the required documentation.
    This action also extends the April 22, 1996 deadline for submittal 
of implementation plans for emission points not included in an 
emissions average to December 31, 1996. The deadline for submitting 
these plans is being extended because the EPA anticipates making 
further revisions to the rule in the near future that could affect the 
contents of the implementation plan. In light of this, the EPA thinks 
it is appropriate to delay this report until there is greater certainty 
regarding the compliance requirements.

DATES: The direct final rule will be effective April 19, 1996, unless 
significant, adverse comments are received by April 1, 1996. If 
significant, adverse comments are timely received on any portion of the 
direct final rule, that portion of the direct final rule will be 
withdrawn.

ADDRESSES: Comments should be submitted (in duplicate, if possible) to: 
Air and Radiation Docket and Information Center (6102), Attention 
Docket Number A-90-20, Room M-1500, U.S. Environmental Protection 
Agency, 401 M Street SW., Washington, DC 20460.

FOR FURTHER INFORMATION CONTACT: Dr. Janet S. Meyer, Emission Standards 
Division (MD-13), U.S. Environmental Protection Agency, Office of Air 
Quality Planning and Standards, Research Triangle Park, North Carolina 
27711, telephone number (919) 541-5254.

SUPPLEMENTARY INFORMATION: If significant adverse comments are timely 
received on any portion of this direct final rule, that portion of the 
direct final rule will be withdrawn and all such comments will be 
addressed in a subsequent final rule based on the proposed rule 
contained in the Proposed Rules Section of this Federal Register that 
is identical to this direct final rule. If no significant adverse 
comments are timely received on this direct final rule, then the direct 
final rule will become effective April 19, 1996, and no further action 
is contemplated on the parallel proposal published today.

I. Background and Summary of Changes to Rule

    On April 22, 1994 (59 FR 19402), and June 6, 1994 (59 FR 29196), 
the EPA promulgated in the Federal Register National Emission Standards 
for Hazardous Air Pollutants (NESHAP) for 

[[Page 7717]]
the Synthetic Organic Chemical Manufacturing Industry (SOCMI), and for 
several other processes subject to the equipment leaks portion of the 
rule. These regulations were promulgated as subparts F, G, H, and I in 
40 CFR Part 63, and are commonly referred to as the hazardous organic 
NESHAP, or the HON. Since the April 22, 1994 notice, there have been 
several amendments to clarify various aspects of the rule. Readers 
should see the following Federal Register notices for more information: 
September 20, 1994 (59 FR 48175); October 24, 1994 (59 FR 53359); 
October 28, 1994 (59 FR 54131); January 27, 1995 (60 FR 5321); April 
10, 1995 (60 FR 18020); April 10, 1995 (60 FR 18026); and December 12, 
1995 (60 FR 63624).

A. Area Source Certification

    On April 10, 1995, new paragraphs were added to Sec. 63.100(b) and 
Sec. 63.103(f) of subpart F and Sec. 63.190(b) of subpart I to provide 
procedures to certify and document that a source is operating below the 
thresholds for a major source. Those provisions specified that the 
certifications were to be submitted no later than May 10, 1995. This 
date was 30 days after the date of publication of the notice and 
consistent with the proposed requirement. Since the amendment was 
issued, the EPA has learned that there are a number of potential area 
source facilities whose owners learned of this amendment for the first 
time after May 10, 1995. The EPA believes that, in view of these 
circumstances, it is appropriate to provide additional time for 
submittal of the certifications. Therefore, this document revises the 
date for submittal of those certifications until May 14, 1996.
    The EPA has also learned that there are questions regarding the 
requirements for documentation that actual emissions are below the 
major source threshold. To address this confusion, the first sentence 
in Sec. 63.100(b)(4)(i)(B) is being revised to clarify that emissions 
are to be estimated for maximum expected operating conditions for the 
facility. This revision is necessary to make the rule consistent with 
the EPA's intent to allow sources with actual annual emissions less 
than major source thresholds the additional time necessary to obtain 
federally enforceable limits (59 FR 53393 and 60 FR 18021). The same 
revision is also being made to Sec. 63.190(b)(7)(i)(B) of subpart I.

B. Date for Submission of Implementation Plan

    The EPA is extending the April 22, 1996 deadline for submittal of 
implementation plans for emission points not included in an emissions 
average to December 31, 1996. The deadline for submitting these plans 
is being extended because there are uncertainties regarding the 
applicability of the rule to certain sources and there are 
uncertainties regarding the requirements of certain provisions. These 
uncertainties are caused by the existence of pending litigation on the 
final rule, the need to review and respond to several recent changes to 
the final rule, and the possibility of further changes being made to 
the final rule in the near future.
    Since the April 22, 1994 notice, there have been several amendments 
to clarify various aspects of the rule. The most recent of these 
notices was published on December 12, 1995. On April 10, 1995 (60 FR 
18071), the EPA proposed to remove three compounds from the list of 
chemical production processes regulated by the rule. The EPA 
anticipates issuing a final notice to complete that rulemaking in the 
near future. Additionally, the EPA anticipates that it is likely to 
propose at least one more set of additional changes to the rule in the 
near future. Since these changes may affect compliance planning for 
some sources, it is appropriate to delay this report until there is 
greater certainty regarding the compliance requirements.

II. Administrative

A. Paperwork Reduction Act

    The information collection requirements of the previously 
promulgated NESHAP were submitted to and approved by the Office of 
Management and Budget (OMB). A copy of this Information Collection 
Request (ICR) document (OMB control number 1414.02) may be obtained 
from Sandy Farmer, Information Policy Branch (PM-223Y); U.S. 
Environmental Protection Agency; 401 M Street, SW; Washington, DC 20460 
or by calling (202) 260-2740.
    Today's changes to the NESHAP should have no impact on the 
information collection burden estimates made previously. The change to 
the area source certification merely revises the date for submission of 
the certification and clarifies the documentation requirements. The 
change to the implementation plan requirements merely extends the date 
for submission of plans from existing sources. These changes do not 
impose new requirements. Consequently, the ICR has not been revised.

B. Executive Order 12866 Review

    Under Executive Order (E.O.) 12866, the EPA must determine whether 
the proposed regulatory action is ``not significant'' and therefore, 
subject to the Office of Management and Budget (OMB) review and the 
requirements of the Executive Order. The Order defines ``significant'' 
regulatory action as one that is likely to lead to a rule that may:
    (1) Have an annual effect on the economy of $100 million or more or 
adversely affect in a material way the economy, a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety in State, local, or tribal governments or communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    The HON rule promulgated on April 22, 1994 was considered 
``significant'' under Executive Order 12866 and a regulatory impact 
analysis (RIA) was prepared. The amendments issued today clarify the 
rule and do not add any additional control requirements. Therefore, 
this regulatory action is considered not significant.

C. Regulatory Flexibility Act

    The Regulatory Flexibility Act of 1980 requires the identification 
of potentially adverse impacts of Federal regulations upon small 
business entities. The Act specifically requires the completion of a 
Regulatory Flexibility Analysis in those instances where small business 
impacts are possible. Pursuant to section 605(b) of the Regulatory 
Flexibility Act, 5 U.S.C. 605(b), the Administrator certifies that this 
rule will not have a significant economic impact on a substantial 
number of small entities. Because this rulemaking imposes no adverse 
economic impacts, a Regulatory Flexibility Analysis has not been 
prepared.

D. Unfunded Mandates

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), the EPA must prepare a budgetary impact 
statement to accompany any proposed or final rule that includes a 
Federal mandate that may result in estimated 

[[Page 7718]]
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under Section 205, the EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires the EPA to establish a 
plan for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    The EPA has determined that the action promulgated today does not 
include a Federal mandate that may result in estimated costs of $100 
million or more to either State, local, or tribal governments in the 
aggregate, or to the private sector. Therefore, the requirements of the 
Unfunded Mandates Act do not apply to this action.

List of Subjects in 40 CFR Part 63

    Environmental protection, Air pollution control, Hazardous 
substances, Reporting and recordkeeping requirements.

    Dated: February 21, 1996.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, title 40, chapter I, part 
63, subparts F, G, and I, of the Code of Federal Regulations are 
amended as follows:

PART 63--[AMENDED]

    1. The authority citation for part 63 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart F--National Emission Standards for Organic Hazardous Air 
Pollutants From the Synthetic Organic Chemical Manufacturing 
Industry

    2. Section 63.100 is amended by revising paragraph (b)(4) 
introductory text and the first sentence in paragraph (b)(4)(i)(B) to 
read as follows:

Sec. 63.100  Applicability and designation of source.

* * * * *
    (b) * * *
    (4) The owner or operator of a chemical manufacturing processing 
unit is exempt from all requirements of subparts F, G, and H of this 
part until not later than April 22, 1997 if the owner or operator 
certifies, in a notification to the appropriate EPA Regional Office, 
not later than May 14, 1996, that the plant site at which the chemical 
manufacturing processing unit is located emits, and will continue to 
emit, during any 12-month period, less than 10 tons per year of any 
individual hazardous air pollutants (HAP), and less than 25 tons per 
year of any combination of HAP.
    (i) * * *
    (B) The owner or operator shall calculate the amount of annual HAP 
emissions released from each emission point at the plant site, using 
acceptable measurement or estimating techniques for maximum expected 
operating conditions at the plant site. * * *
* * * * *

Subpart G--National Emission Standards for Organic Hazardous Air 
Pollutants From the Synthetic Organic Chemical Manufacturing 
Industry for Process Vents, Storage Vessels, Transfer Operations, 
and Wastewater

    3. Section 63.151 is amended by revising paragraph (c)(1)(ii) to 
read as follows:

Sec. 63.151  Initial notification and implementation plan.

* * * * *
    (c) * * *
    (1) * * *
    (ii) Each owner or operator of an existing source subject to this 
subpart who elects to comply with Sec. 63.112 of this subpart by 
complying with the provisions of Secs. 63.113 to 63.148 of this 
subpart, rather than emissions averaging, for any emission points, and 
who has not submitted an operating permit application accompanied by 
the information specified in Sec. 63.152(e) by December 31,1996, shall 
develop an Implementation Plan. For an existing source, the 
Implementation Plan for those emission points that are not to be 
included in an emissions average shall be submitted to the 
Administrator no later than December 31, 1996.
* * * * *

Subpart I--National Emission Standards for Organic Hazardous Air 
Pollutants for Certain Processes Subject to the Negotiated 
Regulation for Equipment Leaks

    4. Section 63.190 is amended by revising paragraph (b)(7) 
introductory text and the first sentence in paragraph (b)(7)(i)(B) to 
read as follows:

Sec. 63.190  Applicability and designation of source.

* * * * *
    (b) * * *
    (7) The owner or operator of a plant site at which a process 
specified in paragraphs (b)(1) through (b)(6) of this section is 
located is exempt from all requirements of this subpart I until not 
later than April 22, 1997 if the owner or operator certifies, in a 
notification to the appropriate EPA Regional Office, not later than May 
14, 1996, that the plant site at which the process is located emits, 
and will continue to emit, during any 12-month period, less than 10 
tons per year of any individual HAP, and less than 25 tons per year of 
any combination of HAP.
    (i) * * *
    (B) The owner or operator shall calculate the amount of annual HAP 
emissions released from each emission point at the plant site, using 
acceptable measurement or estimating techniques for maximum expected 
operating conditions at the plant site. * * *
* * * * *
[FR Doc. 96-4441 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-4432 Reef Fish Fishery of the Gulf of Mexico; Revised 1996 Red Snapper Season
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7751-7754]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4432]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 641

[Docket No. 951221305-6038-02; I.D. 020296B]

Reef Fish Fishery of the Gulf of Mexico; Revised 1996 Red Snapper 
Season

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Emergency interim rule.

-----------------------------------------------------------------------

SUMMARY: NMFS issues this emergency interim rule to suspend 
implementation of the red snapper individual transferable quota (ITQ) 
system for the Gulf of Mexico, previously scheduled to begin April 1, 
1996, to make the entire 1996 commercial quota for red snapper 
available to the fishery which opened February 1, 1996, and to extend 
for the emergency period the red snapper trip limit and permit 
endorsement system. The intended effect is to respond to an emergency 
situation involving the commercial red snapper fishery by preventing 
adverse social and economic impacts on fishery participants while 
allowing a controlled harvest of fish for the 1996 season.

EFFECTIVE DATES: The amendments to Secs. 641.7 paragraphs (nn) through 
(pp) and 641.31 through 641.33 are effective February 23, 1996, through 
May 29, 1996.
    The removal of Secs. 641.34 and 641.7 paragraph (qq) is effective 
February 23, 1996.
    The April 1, 1996, effective date for the amendments to part 641 
listed in amendatory instruction 2 are delayed indefinitely.

ADDRESSES: Copies of documents supporting this action, including an 
environmental assessment, may be obtained from Robert Sadler, Southeast 
Regional Office, NMFS, 9721 Executive Center Drive N., St. Petersburg, 
FL 33702.

FOR FURTHER INFORMATION CONTACT: Robert Sadler, 813-570-5305.

SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf of Mexico 
is managed under the Fishery Management Plan for the Reef Fish 
Resources of the Gulf of Mexico (FMP). The FMP was prepared by the Gulf 
of Mexico Fishery Management Council (Council) and is implemented 
through regulations at 50 CFR part 641 under the authority of the 
Magnuson Fishery Conservation and Management Act (Magnuson Act).

Delayed Opening of the 1996 Commercial Red Snapper Fishery

    Under the provisions of an emergency interim rule (61 FR 17, 
January 2, 1996), requested by the Council and issued by NMFS, (1) the 
opening of the 1996 red snapper commercial fishery was delayed from 
January 1 until February 1, 1996; (2) an interim commercial quota of 
1.00 million lb (0.45 million kg) was established for the period 
February 1 through March 31, 1996; and (3) the red snapper trip limit 
and vessel permit endorsement system was continued 

[[Page 7752]]
through March 31, 1996. These measures were intended to allow a 
controlled commercial fishery for red snapper during the Lenten season, 
when demand for fish is high, prior to implementation of the ITQ system 
on April 1, 1996. (The ITQ system was contained in Amendment 8 to the 
FMP and was published as a final rule on November 29, 1995 (60 FR 
61200). Some paragraphs in that final rule pertaining to the ITQ system 
were recodified in the final rule to implement Amendment 11 (60 FR 
64350, December 15, 1995). Accordingly, this emergency interim rule 
contains references to both of those final rules.)
    In its request for these emergency management measures, the Council 
expressed its intent that should the ITQ system be disapproved by NMFS 
or its implementation be delayed by Congressional action (e.g., 
proposed Congressional moratoriums on ITQ systems), then the commercial 
fishery should remain open until the full annual commercial quota is 
taken under the red snapper trip limit and endorsement system that was 
in effect during 1995.

Delay in the Implementation of the ITQ System

    Because of the furlough of NMFS personnel in late December 1995 and 
early January 1996 and budget limitations under the continuing 
resolution that provides operating funds for the Department of 
Commerce, NMFS is unable to implement the red snapper ITQ system by 
April 1, 1996. As a result of the furlough, NMFS was unable to process 
fishermen's requests for appeals of NMFS' initial determinations 
regarding historical captain status and red snapper landings records. 
Final determinations through the appeals process are essential to 
establish finally who will be initial shareholders in the ITQ system 
and the amounts of their initial shares. In addition, NMFS concluded 
that it would be unreasonable to expect red snapper fishermen to pursue 
their appeals before the Council Appeals Board during February 1996 
when the commercial red snapper fishery is open and fishermen are busy 
with harvesting operations. Under the provisions of Amendment 8 and its 
implementing rule, the appeals process must be completed before NMFS 
can issue red snapper ITQ shares and coupons.

Period of Suspension

    NMFS issues this emergency interim rule, effective initially for 90 
days after its date of publication, as authorized by section 305(c) of 
the Magnuson Act. Should NMFS and the Council agree, this emergency 
interim rule may be extended for an additional period of 90 days. If 
the commercial quota for red snapper, currently 3.06 million pounds 
(1.39 million kg), has not been taken during the initial 90 days, such 
agreement and extension are expected. Since the entire commercial quota 
for 1996 is likely to have been taken under this emergency interim 
rule, or extension thereof, the earliest date that the ITQ system could 
begin operation is January 1, 1997 (beginning of a new fishing year), 
unless the 1996 commercial quota is increased through a separate 
regulatory action and the appeals process is completed.

Red Snapper Trip Limit and Endorsement System

    This rule extends for the emergency period the management regime 
for red snapper that was in effect for the 1995 fishing year and was 
previously extended by the January 2 emergency rule. Specifically, 
landings of red snapper are limited to 2,000 lb (907 kg) per trip or 
day for vessels with red snapper endorsements on their reef fish 
permits; other reef fish permitted vessels are limited to 200 lb (91 
kg) per trip or day. These measures are intended to spread out harvest 
over a longer period of time and avoid the negative social and economic 
impacts and potentially dangerous fishing conditions that would result 
from a derby fishery of very short duration. Monitoring of landings 
under an uncontrolled derby fishery would be difficult, increasing the 
likelihood that the quota would be exceeded. This might result in 
adverse effects on the recovery of the overfished red snapper resource. 
Red snapper permit endorsements that were in effect on December 31, 
1995, have been reissued by NMFS for the 1996 fishing year.

Compliance with NMFS Guidelines for Emergency Rules

    This emergency interim rule meets NMFS' policy guidelines for the 
use of emergency rules, published on January 6, 1992 (57 FR 375). The 
situation (1) results from recent, unforeseen events or recently 
discovered circumstances; (2) presents a serious management problem; 
and (3) realizes immediate benefits from the emergency interim rule 
that outweigh the value of prior notice, opportunity for public 
comment, and deliberative consideration expected under the normal 
rulemaking process.

Recent, Unforeseen Events or Recently Discovered Circumstances

    The furlough of NMFS personnel and curtailed agency operating funds 
under temporary funding bills (``continuing resolutions''), and the 
effects on NMFS' ability to carry out the provisions of Amendment 8 and 
its implementing rule, were unforeseen. As a result of the furlough, 
the Southeast Regional Office was unable to process the requests for 
appeals of its initial determinations regarding historical captain 
status and landings records in a timely manner. The appeals process 
must be completed before NMFS can issue red snapper ITQ shares and 
coupons.

Serious Management Problems in the Fishery

    NMFS believes that this emergency interim rule is necessary to 
address serious management problems with the fishery, which if 
unaddressed, could cause significant adverse social and economic 
impacts on fishery participants.
    If the combined emergency actions of the immediate availability of 
the entire 1996 red snapper commercial quota and the suspension of the 
ITQ system are not taken, then the commercial fishery would have to be 
closed for an indefinite period after the interim 1.00-million lb 
(0.45-million kg) quota is harvested. Since this closure would extend 
significantly beyond April 1, 1996, it would have severe negative 
economic effects, particularly for commercial fishermen who had planned 
to participate in the fishery under the ITQ program commencing April 1.
    Making the entire 1996 red snapper commercial quota immediately 
available for harvest under the trip limit and endorsement system has 
the effect of returning the red snapper management regime for this year 
to the regime that was in place from 1993 through 1995 under provisions 
of the FMP. This regime released the entire annual commercial quota at 
the start of the fishing season, which was timed to ensure that the 
fishery was open during Lent. The fishery remained open, under the 
vessel permit endorsement and trip limit program, until the quota was 
caught (usually sometime in April of each year). This management 
approach, while still presenting fishery problems intended to be 
addressed through the ITQ system, was based on the Council's and NMFS' 
determination that it offered greater social and economic benefits than 
provided by a split season or by a less restrictive harvest rate. The 
expected benefits of this emergency rule are the same as those intended 
from the 

[[Page 7753]]
previous management regime; they are described as follows.
    Traditionally, consumer demand for fresh red snapper is 
significantly higher during the Lenten season (February through March) 
than the rest of the year. The result is that the prices to fishermen 
for their catch are higher at this time than later in the year. 
Consequently, gross revenues to fishermen from taking the remaining 
commercial quota now are significantly higher (although difficult to 
quantify) than if these fish were caught later this year. As such, 
fishermen would suffer substantial economic loss if they were unable to 
continue fishing during this early spring period.
    A continuous commercial red snapper season in the Gulf in recent 
years has avoided or minimized market disruptions in the supply of 
fresh, high quality, fish. In the past, these market disruptions in the 
supply of fresh fish have been shown to have negative effects on 
fishermen's incomes. For example, without a steady supply of fresh 
fish, dealers turn to cheaper, frozen imports to satisfy the consumer 
demand; the result can include temporarily depressed prices and short-
term losses of market share for fresh fish until the dealers exhaust 
their inventories of frozen product. Also, an unstable domestic supply 
of red snapper usually results in wider fluctuations in ex-vessel 
prices for the same quality of product.
    Another benefit of a continuous season is minimizing the time and 
economic costs to fishermen associated with their changing fisheries. 
For example, if the red snapper fishery is opened, closed, and then 
reopened, it would require additional effort and costs for vessel 
owners to change fishing gear, related supplies, and crew each time 
they entered or left the snapper fishery. Also, since the red snapper 
fishery is considered more lucrative than most of the alternative 
fisheries, fishermen would make every effort to reenter this fishery 
when it opens, even after Lent. During a disrupted red snapper season, 
there are added difficulties of finding and keeping experienced, 
reliable crew. In summary, these additional costs/efforts required to 
fish for red snapper during a disrupted season can be particularly 
burdensome for a given vessel owner.
    Finally, a discontinuous red snapper commercial fishery with a 
reopening during late spring/early summer would require fishermen to 
forego their normal deeper water fisheries during that time (e.g., 
tilefish, snowy grouper, and tuna). In order to make a livelihood, most 
fishermen participate in several fisheries during the course of the 
year, and accordingly follow long established seasonal patterns of 
changing fisheries. The red snapper fishery is more readily prosecuted 
in late winter/early spring because the fish are located in near-shore, 
shallower water areas, where they are more concentrated than later in 
the year. There are also distinct safety benefits of being able to fish 
near shore during the bad weather that is common in winter and early 
spring. Other fisheries, particularly the deep water grouper fishery, 
are more readily prosecuted during late spring/early summer when 
weather conditions are more consistent and relatively better. A split 
commercial red snapper season during 1996 would disrupt these 
traditional fishing patterns without any compensatory benefits.
    Without the red snapper endorsement system, which includes vessel 
trip limits, permitted vessels would have no restrictions on landing 
levels. This would result in a derby fishery of very short duration. 
Monitoring of landings under these conditions would be difficult, 
increasing the likelihood that the quota would be exceeded. NMFS is 
concerned that this would adversely impact stock recovery. In addition, 
fishermen would suffer significant economic losses due to lower ex-
vessel prices, as occurred in fishing years before the endorsement and 
trip limit provisions were implemented. To avoid these problems, this 
emergency interim rule continues the trip limits, which will constrain 
vessel landings to the commercial quota, provide for better prices to 
fishermen, and increase the short-term economic yield in the fishery.

Immediate Benefits

    The immediate benefits of the emergency interim rule greatly 
outweigh the value of prior notice and opportunity for public comment 
which would occur under normal rulemaking.

Effect of this Emergency Interim Rule on Existing Regulations

    The emergency interim rule published on January 2, 1996 (61 FR 17) 
is superseded by this emergency interim rule.

Classification

    The Assistant Administrator for Fisheries, NOAA (AA), has 
determined that this rule is necessary to respond to an emergency 
situation and is consistent with the Magnuson Act and other applicable 
law.
    The AA finds that failure to implement the actions in this 
emergency interim rule would result in negative social and economic 
impacts described above and lead to fishing under potentially dangerous 
conditions. In addition, the uncontrolled harvest that would occur 
without these actions could contribute to overfishing of red snapper. 
The foregoing constitutes good cause to waive the requirement to 
provide prior notice and the opportunity for public comment, pursuant 
to authority set forth at 5 U.S.C. 553(b)(B), as such procedures would 
be contrary to the public interest. Similarly, the need to implement 
these measures in a timely manner to address the economic emergency and 
public safety considerations constitutes good cause under 5 U.S.C. 
553(d)(3) to waive the 30-day delay in effectiveness.
    This emergency interim rule has been determined to be significant 
for purposes of E.O. 12866, and has been reviewed and cleared by the 
Office of Management and Budget.
    This emergency interim rule is exempt from the procedures of the 
Regulatory Flexibility Act because this rule is not required to be 
issued with prior notice and opportunity for public comment.

List of Subjects in 50 CFR Part 641

    Fisheries, Fishing, Reporting and recordkeeping requirements.

    Dated: February 21, 1996.
Gary Matlock,
Program Management Officer, National Marine Fisheries Service.
    For the reasons set out in the preamble, 50 CFR part 641 is amended 
as follows:

PART 641--REEF FISH FISHERY OF THE GULF OF MEXICO

    1. The authority citation for part 641 continues to read as 
follows:

    Authority: 16 U.S.C. 1801 et seq.

Secs. 641.1,  641.4, 641.5, 641.7, 641.10, 641.24 [Amended]

    2. The April 1, 1996, effective date of the following amendments is 
delayed indefinitely:
    a. In Sec. 641.1, the revision of paragraph (b), published November 
29, 1995 (60 FR 61206).
    b. In Sec. 641.4, the revision to the third sentence of paragraph 
(i), published November 29, 1995 (60 FR 61207); and the revision to the 
first sentence of paragraph (a)(4) and the addition of paragraph (o), 
published December 15, 1995 (60 FR 64354).
    c. In Sec. 641.5, redesignation of paragraph (d)(3) as paragraph 
(d)(4), revision of paragraph (d)(2), and addition of paragraph (d)(3), 
published November 29, 1995 (60 FR 61207).

[[Page 7754]]

    d. In Sec. 641.7, revisions of paragraphs (g), (r), and (bb), 
published November 29, 1995 (60 FR 61207) and the superseding revisions 
published December 15, 1995 (60 FR 64354); and addition of paragraphs 
(ff) through (kk), published November 29, 1995 (60 FR 61207). [Note: 
The first revision to 641.7(bb) published on November 29, 1995 became 
effective January 1, 1996, and remains in effect.]
    e. In Sec. 641.10, addition of introductory text and paragraphs (a) 
and (b), published November 29, 1995 (60 FR 61207)
    f. In Sec. 641.24, redesignation of paragraphs (a)(2) and (a)(3) as 
paragraphs (a)(3) and (a)(4), respectively, revision of the reference 
in newly redesignated paragraph (a)(4), and addition of paragraph 
(a)(2), published on November 29, 1995 (60 FR 61209).
    3. In Sec. 641.7, paragraph (qq) is removed and paragraphs (nn) 
through (pp) are revised to read as follows. Paragraphs (nn) through 
(pp) are effective through May 29, 1996.

Sec. 641.7  Prohibitions.

* * * * *
    (nn) Exceed the vessel trip or landing limits for red snapper, as 
specified in Sec. 641.31(a) and (b).
    (oo) Transfer a red snapper at sea, as specified in Sec. 641.31(c).
    (pp) Purchase, barter, trade, or sell, or attempt to purchase, 
barter, trade, or sell, a red snapper possessed or landed in excess of 
a trip or landing limit, as specified in Sec. 641.31(d).

Sec. 641.34  [Removed]

    4. Section 641.34 is removed.
    4a. Sections 641.31 through 641.33 are revised to read as follows. 
Sections 641.31 through 641.33 are effective through May 29, 1996.

Sec. 641.31  Red snapper trip limits.

    (a) Except as provided in paragraph (b) of this section, a vessel 
that has on board a valid commercial reef fish permit may not possess 
on any trip or land in any day red snapper in excess of 200 lb (91 kg), 
whole or eviscerated.
    (b) A vessel that has on board a valid commercial reef fish permit 
and a valid red snapper endorsement may not possess on any trip or land 
in any day red snapper in excess of 2,000 lb (907 kg), whole or 
eviscerated.
    (c) A red snapper may not be transferred at sea from one vessel to 
another.
    (d) No person may purchase, barter, trade, or sell, or attempt to 
purchase, barter, trade, or sell, a red snapper possessed or landed in 
excess of the trip or landing limits specified in paragraphs (a) and 
(b) of this section.

Sec. 641.32  Red snapper endorsement.

    (a) As a prerequisite for exemption from the trip limit for red 
snapper specified in Sec. 641.31(a), a vessel for which a commercial 
reef fish permit has been issued under Sec. 641.4 must have a red 
snapper endorsement on such permit and such permit and endorsement must 
be aboard the vessel.
    (b) A red snapper endorsement is invalid upon sale of the vessel; 
however, an owner of a vessel with a commercial reef fish permit may 
transfer the red snapper endorsement to another vessel with a 
commercial reef fish permit owned by the same entity by returning the 
existing endorsement with an application for an endorsement for the 
replacement vessel.
    (c) The provisions of paragraph (b) of this section 
notwithstanding, special provisions apply in the event of the 
disability or death of the owner of a vessel with a red snapper 
endorsement or the disability or death of an operator whose presence 
aboard the vessel is a condition for the validity of a red snapper 
endorsement.
    (1) In the event that a vessel with a red snapper endorsement has a 
change of ownership that is directly related to the disability or death 
of the owner, the Regional Director may issue a red snapper 
endorsement, temporarily or permanently, with the commercial reef fish 
permit that is issued for the vessel under the new owner. Such new 
owner will be the person specified by the owner or his/her legal 
guardian, in the case of a disabled owner, or by the will or executor/
administrator of the estate, in the case of a deceased owner. (Change 
of ownership of a vessel with a commercial reef fish permit upon 
disability or death of an owner is considered a purchase of a permitted 
vessel and Sec. 641.4(m)(3) applies regarding a commercial reef fish 
permit for the vessel under the new owner.)
    (2) In the event of the disability or death of an operator whose 
presence aboard a vessel is a condition for the validity of a red 
snapper endorsement, the Regional Director may revise and reissue an 
endorsement, temporarily or permanently, to the permitted vessel. Such 
revised endorsement will contain the name of a substitute operator 
specified by the operator or his/her legal guardian, in the case of a 
disabled operator, or by the will or executor/administrator of the 
estate, in the case of a deceased operator. As was the case with the 
replaced endorsement, the presence of the substitute operator aboard 
and in charge of the vessel is a condition for the validity of the 
revised endorsement. Such revised endorsement will be reissued only 
with the concurrence of the vessel owner.

Sec. 641.33  Condition of a permit.

    As a condition of a commercial reef fish permit issued under 
Sec. 641.4, without regard to where red snapper are harvested or 
possessed, a vessel with such permit--
    (a) May not exceed the appropriate vessel trip or landing limit for 
red snapper, as specified in Sec. 641.31(a) and (b); and
    (b) May not transfer a red snapper at sea, as specified in 
Sec. 641.31(c).
[FR Doc. 96-4432 Filed 2-23-96; 11:41 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-4399 Nicosulfuron; Pesticide Tolerance
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7732-7734]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4399]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 180

[PP 4F4405/R2206; FRL-5350-8]
RIN 2070-AB78

Nicosulfuron; Pesticide Tolerance

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document establishes tolerances for residues of the 
herbicide nicosulfuron [3-pyridinecarboxamide, 2-((((4,6-
dimethoxypyrimidin-2-yl)aminocarbonyl)aminosulfonyl)-N,N-dimethyl] in 
or on the raw agricultural commodities (RACs) corn, sweet (kernals plus 
cobs with husks removed) at 0.1 part per million (ppm); corn, sweet, 
forage at 0.1 ppm and corn, sweet, fodder (stover) at 0.1 ppm. E.I. du 
Pont de Nemours and Company, Inc., requested these tolerances in a 
petition submitted to EPA pursuant to the Federal Food, Drug, and 
Cosmetic Act (FFDCA).

EFFECTIVE DATE: This regulation becomes effective February 29, 1996.

ADDRESSES: Written objections and hearing requests, identified by the 
document control number [PP4405/R2206], may be submitted to: Hearing 
Clerk (1900), Environmental Protection Agency, Rm. M3708, 401 M St., 
SW., Washington, DC 20460. Fees accompanying objections shall be 
labeled ``Tolerance Petition Fees'' and forwarded to: EPA Headquarters 
Accounting Operations Branch, OPP (Tolerance Fees), P.O. Box 360277M, 
Pittsburgh, PA 15251. A copy of any objections and hearing request 
filed with the Hearing Clerk should be identified by the document 
control number and submitted to: Public Response and Program Resources 
Branch, Field Operations Division (7506C), Office of Pesticide 
Programs, Environmental Protection Agency, 401 M St., SW., Washington, 
DC 20460. In person, bring copy of objections and hearing requests to: 
Rm 1132, CM #2, 1921 Jefferson Davis Hwy., Arlington, VA.
    A copy of objections and hearing requests filed with the Hearing 
Clerk may also be submitted electronically by sending electronic mail 
(e-mail) to: [email protected]. Copies of objections and 
hearing requests must be submitted as an ASCII file avoiding the use of 
special characters and any form of encryption. Copies of objections and 
hearing requests will also be accepted on disks in WordPerfect in 5.1 
file format or ASCII file format. All copies of objections and hearing 
requests in electronic form must be identified by the docket number 
[PP4F4405/R2206]. No Confidential Business Information (CBI) should be 
submitted through e-mail. Electronic copies of objections and hearing 
requests on this rule may be filed online at many Federal Depository 
Libraries. Additional information on electronic submissions can be 
found below in this document.

FOR FURTHER INFORMATION CONTACT: By mail, Robert J. Taylor, Product 
Manager (PM-25), Registration Division (7505C), Office of Pesticide 
Programs, Environmental Protection Agency, 401 M St., SW., Washington, 
DC 20460. Office location, telephone number, and e-mail address: Rm. 
241, CM #2, 1921 Jefferson Davis Hwy., Arlington, VA, (703) 305-6027; 
e-mail: [email protected].

SUPPLEMENTARY INFORMATION: In the Federal Register of February 8, 1995 
(60 FR 7540), EPA issued a notice announcing that Du Pont, Agricultural 
Products, Barley Mill, P.O. Box 80038, Wilmington, DE 19880-0038, had 
submitted a pesticide petition (PP4F4405) proposing to amend 40 CFR 
part 180 by establishing a regulation under section 408(d) of the 
Federal Food, Drug and Cosmetic Act (21 U.S.C. 346a(d) to permit 
residues of the herbicide nicosulfuron (3-pyridinecarboxamide, 2-
((((4,6-dimethoxypyrimidin-2-y1) aminocarbonyl)aminosulfonyl)-N,N-
dimethyl), in or on corn, sweet (kernals plus cobs with husks removed) 
at 0.1 part per million (ppm) and corn, sweet, forage at 0.1 ppm. There 
were no comments or requests for referral to an advisory committee 
received in response to the notice of filing.
    The petitioner subsequently amended the petition by submitting a 
revised Section F proposing to establish tolerances for nicosulfuron in 
or on the RACs corn, sweet (Kernels plus cobs with Husks Removed) at 
0.1 ppm; corn; sweet, forage at 0.1 ppm, and corn, sweet, fodder 
(stover) at 0.1 ppm. In the Federal Register of September 13, 1995 (60 
FR 47578), EPA issued an amended filing notice proposing these 
tolerances. The Agency received one comment opposing these tolerances. 
The commenter's opposition to the tolerance was based upon 
toxicological concerns including the concept of ``NOEL'' (No observed 
effect level); the use of animal testing to represent human reaction to 
potentially toxic substances (pesticides); the indications of a link 
between pesticide exposure and Parkinson's Disease (PD).
    The Agency has reviewed the comment and decided to proceed with 
these tolerances. The Agency, made the decision that a wide variety of 
toxicological studies would serve as the basis for determining if a 
pesticide could be registered and used without unreasonable risk. It is 
true that animal models do not and cannot predict every possible human 
reaction to pesticides, but the general consensus is that they offer 
the best information as to what a pesticide might do to humans. 
Usually, the Agency requires and reviews long-term studies in rodents 
and non-rodents to determine a dose which causes no apparent adverse 
effects. The NOEL is divided by an uncertainty factor - often at least 
100 - to arrive at doses or exposures that should not cause harmful 
effects on humans. In the Agency's regulation of pesticides, the Agency 
does not approve uses which will cause unreasonable adverse effects to 
humans or the environment.
    The Agency understands that the testing of one pesticide at a time 
does not predict all the possible adverse interactions with other 
pesticides - or for that matter other drugs or environmental 
pollutants. The Agency is exploring ways of testing for the 

[[Page 7733]]
interactions of pesticides having similar toxicity endpoint, but 
progress in that area is slow.
    With reference to the indications of a link between pesticide 
exposure and Parkinson's Disease, the Agency is aware that many 
researchers are investigating the potential reaction of pesticide 
exposures to chronic neurological diseases including Parkinson's 
Disease, and additional research is needed to study this important 
area. Available studies in humans or animals have not yet established 
any relationship between pesticide exposures and Parkinson's Disease.
    The data submitted in the petition and other relevant material have 
been evaluated. The toxicology data listed below were considered in 
support of this tolerance.
    1. Several acute toxicology studies placing the technical-grade 
herbicide in Toxicity Category III.
    2. A 1-year feeding study with dogs fed dosages of 0, 6.25, 125, 
and 500 mg/kg/day resulted in a systemic NOEL of 125 mg/kg/day in males 
based upon a decrease in body weight gains and a concomitant increase 
in relative liver and kidney weights in males. The NOEL for females was 
500 mg/kg/day, the highest dose tested (HDT).
    3. A 2-year chronic toxicity/carcinogenicity study with rats fed 
dosages of 0, 1.9/2.6, 58.1/77.1, 289/382, and 786/1,098 mg/kg/day 
(males/females demonstrated that no carcinogenic effects were observed 
under the conditions of the study at dose levels up to and including 
786/1,098 (males/females) mg/kg/day (HDT) and a systemic NOEL equal to 
or greater than 786 mg/kg/day (males) and 1,098 mg/kg/day (females), 
(HDT).
    4. An 18-month carcinogenicity study with mice fed dosages of 0, 
3.3/4.4, 32.7/44.8, 327/438, and 993/1,312 mg/kg/day (males/females) 
demonstrated that no carcinogenic effects were observed under the 
conditions of the study up to and including 993/1,312 (males/females) 
mg/kg/day (HDT) and a systemic NOEL of 993/1,312 (males/females) mg/kg/
day (HDT).
    5. A developmental toxicity study in rats fed dosages of 0, 200, 
1,000, 2,500, and 6,000 mg/kg/day had a developmental and maternal NOEL 
equal to or greater than 6,000 mg/kg/day, (HDT).
    6. A developmental toxicity study in rabbits fed dosages of 0, 100, 
500, 1,000, and 2,000 mg/kg/day had a maternal NOEL of 100 mg/kg/day 
based upon maternal toxicity occurring at 500 mg/kg/day. Maternal 
toxicity was demonstrated by an increase in clinical signs, gross 
pathological observations, abortions, postimplantation loss and 
decrease in body weight gain during the dosing period. The 
developmental NOEL was 500 mg/kg/day based upon developmental toxicity 
evidenced at 1,000 mg/kg/day in the form of reduced mean fetal body 
weights and the apparent increase in postimplantation loss at 500 mg/
kg/day and above.
    7. A multi-generation reproduction study in the rat administered 
dosages of 0, 12.5, 287, and 1,269 mg/kg/day had a systemic NOEL of 287 
mg/kg/day based upon F1 (first mating) females with a lower body weight 
gain during the final week of gestation and a similar pattern in the F0 
females during the same period of gestation at 1,269 mg/kg/day (HDT). 
The reproductive NOEL was 287 mg/kg/day based on a minimal reduction of 
litter size at birth and in pup weights at postpartum days 14 through 
21 in the F2a high-dose group at 1,269 mg/kg/day (HDT).
    8. A mutagenic test with Salmonella typhimurium did not show 
mutagenicity in four test strains (TA97A, TA98, TA100, and TA1535) with 
or without metabolic activation; in vitro chromosomal aberration test 
in cultured human lymphocytes indicated negative response at the 
concentrations of 40 to 470 ug/mL; an unscheduled DNA damage assay at 
the concentrations of 0.04 to 470 ug/mL was negative; in vitro gene 
mutation assay in Chinese hamster ovary cells was nonmutagenic at the 
concentrations of 4 to 465 ug/mL with or without metabolic activation; 
and a micronucleus assay in mouse bone marrow had negative responses at 
the dose levels of 500 to 5,000 mg/kg.
    The reference dose (RFD), based on a 1 year dog feeding study (NOEL 
of 125 mg/kg bwt/day) and using a hundred fold safety factor, is 
calculated to be 1.25 mg/kg bwt/day. The theoretical maximum residue 
contribution (TMRC) for the existing tolerances is 0.000034 mg/kg/day 
and utilizes 0.003% of the RFD. The current action will increase the 
TMRC by 0.000024 mg/kg/day. These tolerances and previously established 
tolerances will utilize a total of 0.005% of the RFD for the overall 
U.S. population. For U.S. subgroup populations nonnursing infants and 
children 1 to 6, the current action and previously established 
tolerances utilize 0.011% of the RFD, assuming that residue levels are 
at the established tolerances and 100% of the crop is treated.
    No desirable data are lacking. The pesticide is useful for the 
purpose for which the tolerance is sought. Adequate analytical 
methodology (liquid chromatography with ultraviolet detection) is 
available for enforcement purposes. The method is not yet published in 
the Pesticide Analytical Manual (PAM), but can be obtained as follows: 
by mail: Calvin Furlow, Public Information Branch, Field Operations 
Division (H7506C), Office of Pesticide Programs, Environmental 
Protection Agency, 401 M St., SW., Washington, DC 20460, Office 
location and telephone number: Crystal Mall #2, Rm 1130A, 1921 
Jefferson Davis Hwy., Arlington, VA, (703-305-5937).
    There are currently no actions pending against the registration of 
this chemical. No secondary residues are expected to occur in poultry, 
meat, meat byproducts, or eggs based on the proposed use on sweet corn, 
since sweet corn is not fed to poultry. No secondary residues are 
expected to occur in milk and the meat, and meat byproducts of cattle, 
goats, hogs, horses and sheep.
    Based on the information cited above, the Agency has determined 
that the establishment of the tolerances by amending 40 CFR part 180 
will protect the public health; therefore, the tolerances are 
established as set forth below. Any person adversely affected by this 
regulation may, within 30 days after publication of this document in 
the Federal Register, file written objections with the Hearing Clerk, 
at the address given above, 40 CFR 178.20. A copy of the objections 
and/or hearing requests filed with the Hearing Clerk should be 
submitted to the OPP docket for this rulemaking. The objections 
submitted must specify the provisions of the regulation deemed 
objectionable and the grounds for the objections (40 CFR 178.25). Each 
objection must be accompanied by the fee prescribed in 40 CFR 180.33 
(i). If a hearing is requested, the objections must include a statement 
of factual issue(s) on which a hearing is requested, the requestor's 
contentions on each such issue, and a summary of any evidence relied 
upon by the objector (40 CFR 178.27). A request for a hearing will be 
granted if the Administrator determines that the material submitted 
shows the following: There is a genuine and substantial issue of fact; 
there is a reasonable possibility that available evidence identified by 
the requestor would, if established, resolve one or more of such issues 
in favor of the requestor, taking into account uncontested claims or 
facts to the contrary; and resolution of the factual issue(s) in the 
manner sought by the requestor would be adequate to justify the action 
requested (40 CFR 178.32).
    A record has been established for this rulemaking under docket 
number [PP 4F4405/R2206] (including objections and hearing requests 
submitted 

[[Page 7734]]
electronically as described below). A public version of this record, 
including printed, paper versions of electronic comments, which does 
not include any information claimed as CBI, is available for inspection 
from 8 a.m. to 4:30 p.m., Monday through Friday, excluding legal 
holidays. The public record is located in Room 1132 of the Public 
Response and Program Resources Branch, Field Operations Division 
(7506C), Office of Pesticide Programs, Environmental Protection Agency, 
Crystal Mall #2, 1921 Jefferson Davis Highway, Arlington, VA.
    Written objections and hearing requests, identified by the docket 
control number [PP 4F4405/R2206] may be submitted to the Hearing Clerk 
(1900), Environmental Protection Agency, Rm. 3708, 401 M St., SW., 
Washington, DC 20460.
    A copy of electronic objections and hearing requests filed with the 
Hearing Clerk can be sent directly to EPA at: opp-
[email protected] A copy of electronic objections and hearing 
requests filed with the Hearing Clerk must be submitted as an ASCII 
file avoiding the use of special characters and any form of encryption.
    The official record for this rulemaking, as well as the public 
version, as described above will be kept in paper form. Accordingly, 
EPA will transfer any objections and hearing requests received 
electronically into printed, paper form as they are received and will 
place the paper copies in the official rulemaking record which will 
also include all objections and hearing requests submitted directly in 
writing. The official rulemaking record is the paper record maintained 
at the address in ``ADDRESSES'' at the beginning of this document.
    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to review by the Office of Management and Budget 
(OMB) and the requirements of the Executive Order. Under section 3(f), 
the order defines a ``significant regulatory action'' as an action that 
is likely to result in a rule: (1) Having an annual effect on the 
economy of $100 million or more, or adversely and materially affecting 
a sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities (also referred to as ``economically 
significant''); (2) creating serious inconsistency or otherwise 
interfering with an action taken or planned by another agency; (3) 
materially altering the budgetary impacts of entitlement, grants, user 
fees, or loan programs or the rights and obligation of recipients 
thereof: or (4) raising novel legal or policy issues arising out of 
legal mandates, the President's priorities, or the principles set forth 
in this Executive Order.
    Pursuant to the terms of the Executive Order, EPA has determined 
that this rule is not ``significant'' and is therefore not subject to 
OMB review. Pursuant to the requirements of the Regulatory Flexibility 
Act (Pub. L. 96-354, 94 Stat. 1164, 21 U.S.C. 601-612), the 
Administrator has determined that regulations establishing new 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant economic impact on a substantial number of 
small entities. A certification statement to this effect was published 
in the Federal Register of May 4, 1981 (46 FR 24950).

List of Subjects in 40 CFR Part 180

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Pesticides and pests, Reporting and 
recordkeeping requirements.

    Dated: February 20, 1996.
Stephen L. Johnson,
Director, Registration Division, Office of Pesticide Programs.
    Therefore, 40 CFR part 180 is amended as follows:

PART 180--[AMENDED]

    1. The authority citation for part 180 continues to read as 
follows:

    Authority: 21 U.S.C. 346a and 371.

    2. In section 180.454 by amending the table therein by adding and 
alphabetically inserting new entries for corn, sweet (kernals plus cobs 
with husks removed); corn, sweet, fodder (stover); and corn, sweet, 
forage; to read as follows:

Sec. 180.454   Nicosulfuron, [3-pyridinecarboxamide, 2-((((4,6-
dimethoxypyrimidin-2-yl)aminocarbonyl)aminosulfonyl)-N,N-dimethyl]; 
tolerances for residues.

    *    *    *    *    *

                                                                        
------------------------------------------------------------------------
                   Commodity                        Parts per million   
------------------------------------------------------------------------
                                                                        
              *        *        *        *        *                     
corn, sweet (kernals plus cobs with husks                               
 removed)......................................                      0.1
corn sweet, fodder (stover)....................                      0.1
corn, sweet, forage............................                      0.1
------------------------------------------------------------------------

[FR Doc. 96-4399 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-4396 Sethoxydim; Pesticide Tolerance
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7727-7729]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4396]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 180

[PP 4F4344/R2207; FRL-5350-7]
RIN 2070-AB78

Sethoxydim; Pesticide Tolerance

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document establishes a pesticide tolerance for the 
combined residues of the herbicide sethoxydim; 2-[1-
(ethoxyimino)butyl]-5-[2-(ethylthio)propyl]-3-hydroxy-2-cyclohexene-1-
one) and its metabolites containing the 2-cyclohexene-1-one moiety 
(calculated as the herbicide) in or on the raw agricultural commodities 
(RACs) corn, field, grain at 0.5 parts per million (ppm); corn, fodder 
at 2.5 ppm; and corn forage at 2.0 ppm. These tolerances replace 
current entries for field corn, grain; corn, fodder; and corn, forage. 
BASF Corporation requested these tolerances in a petition submitted to 
EPA pursuant to Federal Food, Drug, and Cosmetic Act (FFDCA).

EFFECTIVE DATE: February 29, 1996.

ADDRESSES: Written objections and hearing requests, identified by the 
docket control number, [PP 4F4344/R2207], may be submitted to: Hearing 
Clerk (1900), Environmental Protection Agency, Rm M3708, 401 M St., 
SW., Washington, DC 20460. Fees accompanying objections shall be 
labeled ``Tolerance Petition Fees'' and forwarded to EPA Headquarters 
Accounting Office Branch, OPP (Tolerance Fees), P.O. Box 360277M, 
Pittsburgh, PA 15251. A copy of any objections and hearing requests 
filed with the Hearing Clerk should be identified by the docket control 
number and submitted to: Public Response and Program Resources Branch, 
Field Operations Division (7506C), Office of Pesticide Programs, 
Environmental Protection Agency, 401 M St., SW., Washington, DC 20460. 
In person, bring copy of objections and hearing request to: Rm 1132, CM 
#2, 1921 Jefferson Davis Hwy., Arlington, VA.
    A copy of objections and hearing requests filed with the Hearing 
Clerk may also be submitted electronically by sending electronic mail 
(e-mail) to: [email protected]. Copies of objections and hearing 
request must submitted as an ACSII file avoiding the use of special 
characters and any firm of encryption. Copies of objections and hearing 
requests will also be accepted on disks in Word Perfect in 5.1 file 
format or ASCII file format. All copies of objections and hearing 
requests in electronic form must be identified by the docket number 
[4F4344/R2207]. No Confidential Business Information (CBI) should be 
submitted through e-mail. Electronic copies of objections and hearing 
requests on this rule may be filed online at many Federal Depository 
Libraries. Additional information on electronic submissions can be 
found below in this document.

FOR FURTHER INFORMATION CONTACT: By mail, Robert J. Taylor, Product 
Manager (PM 25), Registration Division (7505C), Office of Pesticide 
Programs, Environmental Protection Agency, 401 M St., SW., Washington, 
DC 20460. Office location, telephone number, and e-mail address: Rm. 
241, CM #2, 1921 Jefferson Davis Hwy., Arlington, VA, (703) 305-6027; 
e-mail: [email protected].
SUPPLEMENTARY INFORMATION: On August 17, 1995 (60 FR 42884), EPA issued 
a notice in the Federal Register announcing that BASF Corporation, P.O. 
Box 13528, Research Triangle Park, NC 27709-3528, had submitted a 
pesticide petition (PP 4F4344) to EPA proposing to amend 40 CFR part 
180 pursuant to section 408(d) of the Federal Food, Drug, and Cosmetic 
Act (FFDCA), 21 U.S.C. 346a(d), establishing regulations to permit the 
combined residues of the herbicide sethoxydim; 2-[1-
(ethoxyimino)butyl]-5-[2-(ethylthio)propyl]-3-hydroxy-2-cyclohexene-1-
one) and its metabolites containing the 2-cyclohexene-1-one moiety 
(calculated as the herbicide) in or on the raw agricultural commodities 
(RACs) corn, grain at 0.5 part per million (ppm); corn, fodder at 2.5 
ppm; corn, forage at 2.0 ppm, and corn, silage at 2.0 ppm.
    No comments were received in response to this notice of filing.
    The petitioner subsequently amended the petition by submitting a 
revised section F deleting the proposed tolerance for corn silage. 
Because this is a deletion of a previously proposed tolerance, no 
longer in Table 2 of the Residue Chemistry Guidelines, there is no 
potential risk to humans. Therefore an additional period of public 
comment is not necessary.
    The scientific data submitted in the petitions and other relevant 
material have been evaluated. The toxicological data considered in 
support of the proposed tolerances include:
    1. Several acute toxicology studies place technical sethoxydim in 
acute toxicity category IV for primary eye and dermal irritation and 
acute toxicity category III for acute oral, dermal, and inhalation. The 
dermal sensitization - guinea pig study was waived because no 
sensitization was seen in guinea pigs dosed with the end-use product 
Poast (18% a.i.).
    2. A 21-day dermal study with rabbits fed dosages of 0, 40, 200, 
and 1,000 mg/kg/day with a NOEL (no-observed adverse effect level) of 
greater than 1,000 mg/kg/day (limit dose).
    3. A 1-year feeding study with dogs fed dosages (based on 
consumption) of 0, 8.86/9.41, 17.5/19.9, and 110/129 mg/kg/day (males/
females) with a NOEL (no-observed effect level) of 8.86/9.41 mg/kg/day 
(males/ females) based on equivocal anemia in males and females at 
17.5/19.9 mg/kg/day, respectively.
    4. A 2-year chronic feeding/carcinogenicity study with mice fed 
dosages of 0, 6, 18, 54, and 162 mg/kg/day with no carcinogenic effects 
observed under the conditions of the study at dose levels up to and 
including 162 mg/kg/day (highest dose tested (HDT)) and a systemic NOEL 
of 18 mg/kg/day. A maximum tolerated dose (MTD) was not achieved for 
females in this study. A determination of the need for an additional 
study will be made once the replacement chronic feeding/carcinogenicity 
study in rats is evaluated.
    5. A 2-year chronic feeding/carcinogenic study with rats fed 
dosages of 0, 2, 6, and 18 mg/kg/day (HDT) with no carcinogenic effects 
observed under the conditions of the study at dosage levels up to and 
including 18 mg/kg/day (HDT) and a systemic NOEL greater than or equal 
to 18 mg/kg/day (HDT). This study was reviewed under current guidelines 
and was found to be unacceptable because the doses used were 
insufficient to induce a toxic response and a maximum tolerated dose 
(MTD) was not achieved. This study must be repeated.
    6. A chronic feeding/carcinogenic study with rats was submitted to 
supplement the above study. Rats in this study were fed dosages of 0, 
18.2/23.0, and 55.9/71.8 mg/kg/day (males/females) with no carcinogenic 
effects observed under the conditions of the study at dose levels up to 
and including 55.9/71.8 mg/kg/day (HDT) (males/females) and a systemic 
NOEL greater than or equal to 55.9/71.8 mg/kg/day (males/females). The 
doses used were insufficient to induce a toxic response and failed to 
achieve an MTD or define a Lowest Effect Level (LEL). Slight decreases 
in body weights in the final 

[[Page 7728]]
quarter of the study, although not biologically significant, can 
support a free standing NOEL of 55.9/71.8 mg/kg/day (males/females). A 
new study is necessary to replace both this study and the one discussed 
above.
    7. A developmental toxicity study in rats fed dosages of 0, 50, 
180, 650, and 1,000 11mg/kg/day with a maternal NOEL of 180 mg/kg/day 
and a maternal LEL of 650 mg/kg/day (irregular gait, decreased 
activity, excessive salivation, and anogenital staining); and a 
developmental NOEL of 180 mg/kg/day and a developmental LEL of 650 mg/
kg/day (21-22% decrease in fetal weights, filamentous tail and lack of 
tail due to the absence of sacral and/or caudal vertebrae, and delayed 
ossification in the hyoids, vertebral centrum and/or transverse 
processes, sternebrae and/or metatarsals, and pubes).
    8. A developmental toxicity study in rabbits fed doses of 0, 80, 
160, 320, and 400 mg/kg/day with a maternal NOEL of 320 mg/kg/day and a 
maternal lowest observable effect level (LOEL) of 400 mg/kg/day (37% 
reduction in body weight gain without significant differences in group 
mean body weights, and decreased food consumption during dosing); and a 
developmental NOEL greater than 400 mg/kg/day (HDT).
    9. A 2-generation reproduction study with rats fed dosage levels of 
0, 150, 600, and 3,000 ppm (approximately 0, 7.5, 30, and 150 mg/kg/
day) with no reproductive effects observed at 3,000 ppm (approximately 
150 mg/kg/day) (HDT). However, the Agency considers this study usable 
for regulatory purposes and has established a free-standing NOEL of 
3,000 ppm (approximately 150 mg/kg/ day).
    10. Mutagenicity studies included: Ames Assays which were negative 
for Salmonella typhimurium strains TA98, TA100, TA1535, and TA 1537, 
with and without metabolic activity; sethoxydim did not cause 
structural chromosomal aberrations at doses up to 5,000 mg/kg in 
Chinese hamster bone marrow cells in vivo; a Host Mediated Assay 
(mouse) with S. typhimurium was negative at 2.5 grams/kg/day of 
chemical, and recombinant assays and forward mutations in Bacillus 
subtilis, Escherichia coli, and S. typhimurium were all negative at 
concentrations of greater than or equal to 100%; an in vitro 
Unscheduled DNA Synthesis Assay in Primary Rat Hepatocytes had a 
negative response for DNA repair (UDS) in primary rat hepatocyte 
cultures exposed up to insoluble (>101 ug/ml) and cytotoxic (507 ug/ml) 
doses.
    11. In a rat metabolism study, excretion was extremely rapid and 
tissue accumulation was negligible, assuming DMSO vehicle does not 
affect excretion or storage of NP-55 (78% excreted into urine and 20.1% 
in feces).
    The reference dose (RFD) based on a NOEL of 8.86 mg/kg bwt/day in 
the 1-year feeding study in dogs, and an uncertainty factor of 100 was 
calculated to be 0.09 mg/kg bwt/day. The theoretical maximum residue 
contribution (TMRC) for existing tolerances for the overall U. S. 
population is 0.032767 mg/kg bwt/day or 35% of the RfD. The current 
action will increase the TMRC by 0.000134 mg/kg bwt/day. These 
tolerances and previously established tolerances utilize a total of 37 
percent of the RfD for the overall U.S. population. For U.S. subgroup 
populations, nonnursing infants and children aged 1 to 6, the current 
action and previously established tolerances utilize, respectively, a 
total of 63.5% and 74% of the ADI, assuming that residue levels are at 
the established tolerances and that 100% of the crop is treated. [These 
studies are also referenced in an EPA proposed rule on sethoxydim 
published elsewhere in this issue of the Federal Register.]
    Desirable data lacking based on review of data under current 
guidelines include a repeat of the chronic feeding/carcinogenicity 
study in rats. Once the rat study is evaluated, a repeat of the mouse 
carcinogenicity study may be needed. Because the current studies, 
although unacceptable by current guidelines, provide useful information 
and these tolerances utilize less than 1% of the RfD, the Agency 
believes there is little risk from establishment of these tolerances. 
Any additional tolerance proposals will be considered on a case-by-case 
basis.
    The pesticide is useful for the purposes for which these tolerances 
are sought and capable of achieving the intended physical or technical 
effect. The nature of the residue is adequately understood, and 
adequate analytical methods (gas chromatography using sulfur-specific 
flame photometric detection) are available for enforcement purposes. 
Previously approved versions of the analytical method are listed in the 
Pesticide Analytical Manual, Volume II (PAM II), as Method I. The 
analytical methods for corn grain, fodder, and forage are revisions of 
the above method. Because of the long lead time from establishing these 
tolerances until publication, the enforcement methodology for corn 
grain, fodder, and forage are being made available in the interim to 
anyone interested in pesticide enforcement when requested by mail from: 
Calvin Furlow, Public Response Resources Branch, Field Operations 
Division (7506C), Office of Pesticide Programs, Environmental 
Protection Agency, 401 M St., SW., Washington, DC 20460. Office 
location and telephone number; Rm 1130 A, CM #2, 1921 Jefferson Davis 
Hwy., Arlington, VA, (703) 305-6027.
    There are currently no actions pending against the registration of 
this chemical. Any expectation of residues occurring in eggs, milk, 
meat, fat or meat by-products of cattle, goats, hogs, horses, and sheep 
or poultry will be covered by existing tolerances.
    Based on the information and data considered, the Agency has 
determined that the tolerances established by amending 40 CFR part 180 
would protect the public health. Therefore, EPA is establishing the 
tolerances as set forth below.
    Any person adversely affected by this regulation may, within 30 
days after publication of this document in the Federal Register, file 
written objections with the Hearing Clerk, at the address given above 
(40 CFR 178.20). A copy of the objections and/or hearing requests filed 
with the Hearing Clerk should be submitted to the OPP docket for this 
rulemaking. The objections submitted must specify the provisions of the 
regulation deemed objectionable and the grounds for the objections (40 
CFR 178.25). Each objection must be accompanied by the fee prescribed 
by 40 CFR 180.33(i). If a hearing is requested, the objections must 
include a statement of the factual issue(s) on which a hearing is 
requested, the requestor's contentions on each such issue, and a 
summary of any evidence relied upon by the objector (40 CFR 178.27). A 
request for a hearing will be granted if the Administrator determines 
that the material submitted shows the following: There is a genuine and 
substantial issue of fact; there is a reasonable possibility that 
available evidence identified by the requestor would, if established, 
resolve one or more of such issues in favor of the requestor, taking 
into account uncontested claims or facts to the contrary; and 
resolution of the factual issue(s) in the manner sought by the 
requestor would be adequate to justify the action requested (40 CFR 
178.32).
    A record has been established for this rulemaking under docket 
number [PP 4F4344/R2207] (including objections and hearing requests 
submitted electronically as described below). A public version of this 
record, including printed, paper versions of electronic comments, which 
does not include any information claimed as CBI, is available for 
inspection from 8 a.m. to 4:30 pm., Monday through Friday, excluding 
legal 

[[Page 7729]]
holidays. The public record is located in Room 1132 of the Public 
Response and Program Resources Branch, Field Operations Division 
(7506C), Office of Pesticide Programs, Environmental Protection Agency, 
Crystal Mall #2, 1921 Jefferson Davis Highway, Arlington, VA.
    Written objections and hearing requests, identified by the docket 
control number [PP 4F4344/R2207], may be submitted to the Hearing Clerk 
(1900), Environmental Protection Agency, Rm 3708, 401 M St., SW., 
Washington, DC 20460.
    A copy of electronic objections and hearing requests filed with the 
Hearing Clerk can be sent directly to EPA at:
    [email protected]
    A copy of electronic objections and hearing requests filed with the 
Hearing Clerk must be submitted as an ASCII file avoiding the use of 
special characters and any form of encryption.
    The official record for this rulemaking, as well as the public 
version, as described above will be kept in paper form. Accordingly, 
EPA will transfer any objections and hearing requests received 
electronically into printed, paper form as they are received and will 
place the paper copies in the official rulemaking record which will 
also include all objections and hearing requests submitted directly in 
writing. The official rulemaking record is a paper record maintained at 
the address in ``ADDRESSES'' at the beginning of this document.
    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to review by the Office of Management and Budget 
(OMB) and the requirements of the Executive Order. Under section 3(f), 
the order defines a ``significant regulatory action'' as an action that 
is likely to result in a rule: (1) Having an annual effect on the 
economy of $100 million or more, or adversely and materially affecting 
a sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities (also referred to as ``economically 
significant''); (2) creating serious inconsistency or otherwise 
interfering with an action taken or planned by another agency; (3) 
materially altering the budgetary impacts of entitlement, grants, user 
fees, or loan programs or the rights and obligation of recipients 
thereof; or (4) raising novel legal or policy issues arising out of 
legal mandates, the President`s priorities, or the principles set forth 
in this Executive Order.
    Pursuant to the terms of the Executive Order, EPA has determined 
that this rule is not ``significant'' and is therefore not subject to 
OMB review. Pursuant to the requirements of the Regulatory Flexibility 
Act (Pub L. 96-354, 94 Stat. 1164, 5 U.S.C. 601-612), the Administrator 
has determined that regulations establishing new tolerances or raising 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant economic impact on a substantial number of 
small entities. A certification statement to this effect was published 
in the Federal Register of May 4, 1981 (46 FR 24950).

List of Subjects in 40 CFR Part 180

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Food additive, Pesticides and pests, 
Reporting and recordkeeping requirements.

    Dated: February 20, 1996.
Stephen L. Johnson,
Director, Registration Division, Office of Pesticide Programs.
    Therefore, 40 CFR part 180 is amended as follows:

PART 180--[AMENDED]

    1. The authority citation for part 180 continues to read as 
follows:

    Authority: 21 U.S.C. 346a and 371.

    2. In Sec. 180.412(a), by revising the entries for corn, field, 
grain; corn fodder; and corn forage to read as follows.

Sec. 180.412   2-[1-Ethoxyimino)butyl]-5-(2-ethylthio)propyl]-3-
hydroxy-2-cyclohexen-1-one; tolerances for residues.

    (a)  *    *    *

                                                                        
------------------------------------------------------------------------
                   Commodity                        Parts per million   
------------------------------------------------------------------------
                                                                        
                  *        *        *        *        *                 
corn, field, grain.............................                      0.5
corn fodder....................................                      2.5
corn forage....................................                      2.0
                                                                        
                  *        *        *        *        *                 
------------------------------------------------------------------------

    *      *      *      *      *      

[FR Doc. 96-4396 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-4395 Pesticide Tolerance for Glyphosate
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7729-7732]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4395]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 180

[PP 5F4493/R2205; FRL-5351-5]
RIN 2070-AB78

Pesticide Tolerance for Glyphosate

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule establishes a tolerance for residues of the 
herbicide glyphosate [N-(phosphonomethyl)glycine] in or on the raw 
agricultural commodity (RAC) cotton gin byproducts at 100 parts per 
million (ppm). Monsanto Company requested this tolerance in a petition 
submitted to EPA pursuant to the Federal Food, Drug, and Cosmetic Act 
(FFDCA).
EFFECTIVE DATE: These regulations become effective February 29, 1996.

ADDRESSES: Written objection and hearing requests, identified by the 
docket number, [PP 5F4493/R2205], may be submitted to: Hearing Clerk 
(1900), Environmental Protection Agency, Rm. M3708, 401 M St., SW., 
Washington, DC 20460. Fees accompanying objections shall be labeled 
``Tolerance Petition Fees'' and forwarded to: EPA Headquarters 
Accounting Operations Branch, OPP (Tolerance Fees), P.O. Box 360277M, 
Pittsburgh, PA 15251. A copy of any objections and hearing request 
filed with the Hearing Clerk should be identified by the docket number 
and submitted to: Public Response and Program Resources Branch, Field 
Operations Division (7506C), Office of Pesticide Programs, 
Environmental Protection Agency, 401 M St., SW., Washington, DC 20460. 
In person, bring a copy of objections and hearing requests to: Rm. 
1132, CM #2, 1921 Jefferson Davis Hwy., Arlington, VA 22202. A copy of 
objections and hearing requests filed with the Hearing Clerk may also 
be submitted electronically by sending electronic mail (e-mail) to: 
[email protected].
    Copies of objections and hearing requests must be submitted as an 
ASCII file avoiding the use of special characters and any form of 
encryption. Copies of objections and hearing requests will also be 
accepted on disks in WordPerfect 5.1 file format or ASCII file format. 
All copies of objections and hearing requests in electronic form must 
be identified by the docket number [PP 5F4493/R2205]. No Confidential 
Business Information (CBI) should be submitted through e-mail. 
Electronic copies of objections and hearing requests on this rule may 
be filed online 

[[Page 7730]]
at many Federal Depository Libraries. Additional information on 
electronic submission can be found below in this document.

FOR FURTHER INFORMATION CONTACT: By mail, Robert J. Taylor, Product 
Manager, Registration Division (H7505C), Office of Pesticide Programs, 
Environmental Protection Agency, 401 M St., SW., Washington, DC 20460. 
Office location and telephone number: Rm. 241, CM #2, 1921 Jefferson 
Davis Hwy., Arlington, VA, (703)-305-6027; e-mail: 
[email protected].
SUPPLEMENTARY INFORMATION: EPA issued a notice in the Federal Register 
of August 17, 1995 (60 FR 42884), which announced that Monsanto 
Company, 700 14th Street, NW., Suite #1100, Washington, DC 20005 had 
submitted a petition (5F4493) proposing to amend 40 CFR part 180 
pursuant to section 408 (d) of the Federal Food, Drug, and Cosmetic Act 
(FFDCA) 21 U.S.C. 346 (a), by establishing a regulation to permit 
residues of the herbicide glyphosate [N-(phosphonomethyl)glycine] 
resulting from the application of the isopropylamine salt and/or the 
monoammonium salt of glyphosate in or on the raw agricultural commodity 
(RAC) cotton gin byproducts at 100 parts per million (ppm).
    There were no comments or requests for referral to an advisory 
committee received in response to this notice of filing.
    The data submitted in the petitions and other relevant material 
have been evaluated. The glyphosate toxicological data listed below 
were considered in support of these tolerances.
    1. Several acute toxicology studies placing technical-grade 
glyphosate in Toxicity Category III and Toxicity Category IV.
    2. A 1-year feeding study with dogs fed dosage levels of 0, 20, 
100, and 500 milligrams/kilogram/day (mg/kg/day) with a no-observable-
effect level (NOEL) of 500 mg/kg/day.
    3. A 2-year carcinogenicity study in mice fed dosage levels of 0, 
150, 750, and 4,500 mg/kg/day with no carcinogenic effect at the 
highest dose tested (HDT) of 4,500 mg/kg/day.
    4. A chronic feeding/carcinogenicity study in male and female rats 
fed dosage levels of 0, 3, 10, and 31 mg/kg/day (males) and 0, 3, 11, 
or 34 mg/kg/day (females) with no carcinogenic effects observed under 
the conditions of the study at dose levels up to and including 31 mg/
kg/day (HDT) (males) and 34 mg/kg/day (HDT) (females) and a systemic 
NOEL of 31 mg/kg/day (HDT)(males) and 34 mg/kg/day (HDT) (females). 
Because a maximum tolerated dose (MTD) was not reached, this study was 
classified as supplemental for carcinogenicity.
    5. A chronic feeding/carcinogenicity study in male and female rats 
fed dosage levels of 0, 89, 362, and 940 mg/kg/day (males) and 0, 113, 
457, and 1,183 mg/kg/day (females) with no carcinogenic effects noted 
under the conditions of the study at dose levels up to and including 
940/1,183 mg/kg/day (males/females) (HDT) and a systemic NOEL of 362 
mg/kg/day (males) based on an increased incidence of cataracts and lens 
abnormalities, decreased urinary pH, increased liver weight and 
increased liver weight/brain ratio (relative liver weight) at 940 mg/
kg/day (males) (HDT) and 457 mg/kg/day (females) based on decreased 
body weight gain 1,183 mg/kg/day (females) (HDT).
    6. A developmental toxicity study in rats given doses of 0, 300, 
1,000, and 3,500 mg/kg/day with a developmental NOEL of 1,000 mg/kg/day 
based on an increase in number of litters and fetuses with unossified 
sternebrae, and decrease in fetal body weight at 3,500 mg/kg/day, and a 
maternal NOEL of 1,000 mg/kg/day based on decrease in body weight gain, 
diarrhea, soft stools, breathing rattles, inactivity, red matter in the 
region of nose, mouth, forelimbs, or dorsal head, and deaths at 3,500 
mg/kg/day (HDT).
    7. A developmental toxicity study in rabbits given doses of 0, 75, 
175, and 350 mg/kg/day with a developmental NOEL of 350 mg/kg/day 
(HDT); a maternal NOEL of 175 mg/kg/day based on increased incidence of 
soft stool, diarrhea, nasal discharge, and deaths at 350 mg/kg/day 
(HDT).
    8. A multigeneration reproduction study with rats fed dosage levels 
of 0, 3, 10, and 30 mg/kg/day with a developmental NOEL of 10 mg/kg/day 
based on increased incidence of focal tubular dilation of the kidney 
(both unilateral and bilateral combined) of male F3b pups.
    9. A two generation reproduction study with rats fed dosage levels 
of 0, 100, 500, and 1,500 mg/kg/day with a developmental NOEL of 500 
mg/kg/day based on decreased pup body weight and body weight gain on 
lactation days 14 and 21 at 1,500 mg/kg/day (HDT), a systemic NOEL of 
500 mg/kg/day based on soft stools in Fo and F1 males and females at 
1,500 mg/kg/day (HDT) and a reproductive NOEL of 1,500 mg/kg/day (HDT).
    10. Mutagenicity data included chromosomal aberration in vitro (no 
aberrations in Chinese hamster ovary cells were caused with and without 
S9 activation); DNA repair in rat hepatocyte; in vivo bone marrow 
cytogenic test in rats; rec-assay with B. subtilis; reverse mutation 
test with S. typhimurium; Ames test with S. typhimurium; and dominant-
lethal mutagenicity test in mice (all negative).
    The reference dose (RfD) based on a developmental study with 
rabbits (NOEL of 175 mg/kg/bwt/day) and using a hundred-fold safety 
factor is calculated to be 2.0 mg/kg/bwt/day. The theoretical maximum 
residue contribution (TMRC) for published tolerances and food and feed 
additive regulations is 0.02059 mg/kg/bwt/day or 1.0 percent of the RfD 
for the overall U.S. population. The current action on cotton gin 
byproducts will not increase the TMRC or percent of the RfD. 
Established tolerances utilize a total of 1.0 percent of the RfD for 
the overall U.S. population.
    For U.S. subgroup populations, nonnursing infants and children 1 to 
6 years of age, the current action and previously established 
tolerances and the food additive regulation utilize, respectively, a 
total of 2.4 and 2.3 percent of the RfD, assuming that residue levels 
are at the established tolerance levels and that 100 percent of the 
crop is treated.
    There are no desirable data lacking for this pesticide. There are 
currently no actions pending against the continued registration of this 
pesticide. No detectable residues of N-nitrosoglyphosate, a contaminant 
of glyphosate, are expected to be present in the commodities for which 
tolerances are established. The carcinogenic potential of glyphosate 
was first considered by a panel, then called the Toxicology Branch AD 
Hoc Committee, in 1985. The Committee, in a consensus review dated 
March 4, 1985, classified glyphosate as a Group C carcinogen based on 
an increased incidence of renal tumors in male mice. The Committee also 
concluded that dose levels tested in the 26-month rat study were not 
adequate for assessment of glyphosate's carcinogenic potential in this 
species. These findings, along with additional information, including a 
reexamination of the kidney slides from the long-term mouse study, were 
referred to the FIFRA Scientific Advisory Panel (SAP). In its report 
dated February 24, 1986, SAP classified glyphosate as a Group D 
Carcinogen (inadequate animal evidence of carcinogenic potential). SAP 
concluded that, after adjusting for the greater survival in the high-
dose mice compared to concurrent controls, that no statistically 
significant pairwise differences existed, although the trend was 
significant. 

[[Page 7731]]

    The SAP determined that the carcinogenic potential of glyphosate 
could not be determined from existing data and proposed that the rat 
and/or mouse studies be repeated in order to classify these equivocal 
findings. On reexamination of all information, the Agency classified 
glyphosate as a Group D Carcinogen and requested that the rat study be 
repeated and that a decision on the need for a repeat mouse study would 
be made upon completion of review of the rat study.
    Upon receipt and review of the second rat chronic feeding/
carcinogenicity study, all toxicological findings for glyphosate were 
referred to the Health Effects Division Carcinogenicity Peer Review 
Committee on June 26, 1991, for discussion and evaluation of the 
weight-of-evidence on glyphosate with particular emphasis on its 
carcinogenic potential. The Peer Review Committee classified glyphosate 
as a Group E (evidence of noncarcinogenicity for humans), based upon 
lack of convincing carcinogenicity evidence in adequate studies in two 
animal species. This classification is based on the following findings: 
(1) None of the types of tumors observed in the studies (pancreatic 
islet cell adenomas in male rat, thyroid c-cell adenomas and/or 
carcinomas in male and female rats, hepatocellular adenomas and 
carcinomas in male rats, and renal tubular neoplasms in male mice) were 
determined to be compound related; (2) glyphosate was tested up to the 
limit dose on the rat and up to levels higher than the limit dose in 
mice; and (3) there is no evidence of genotoxicity for glyphosate. 
Accordingly, EPA concludes that glyphosate has not been ``found to 
induce cancer when ingested by man or animal.'' 21 U.S.C. 348(c)(3).
    The nature of the residue in plants is adequately understood, 
adequate methodology (HPLC) with flurometric detection is available for 
enforcement purposes, and the methodology has been published in the 
Pesticide Analytical Manual (PAM), Vol. II. Any secondary residues 
occurring in the kidney and liver of cattle, goats, horses, hogs, and 
sheep and liver and kidney of poultry will be covered by existing 
tolerances. The pesticide is considered useful for the purpose for 
which the regulation is sought and is capable of achieving the intended 
physical or technical effect.
    Based on the information cited above, the Agency has determined 
that the establishment of this tolerance by amending 40 CFR part 180 
will protect the public health. Therefore, EPA is establishing this 
tolerance as set forth below.
    Any person adversely affected by this regulation may, within 30 
days after publication of this document in the Federal Register, file 
written objections with the Hearing Clerk, at the address given above. 
40 CFR 178.20. A copy of the objections and/or hearing requests filed 
with the Hearing Clerk should be submitted to the OPP docket for this 
rulemaking. The objections submitted must specify the provisions of the 
regulation deemed objectionable and the grounds for the objections. 40 
CFR 178.25. Each objection must be accompanied by the fee prescribed by 
40 CFR 180.33(i). If a hearing is requested, the objections must 
include a statement of the factual issue(s) on which the hearing is 
requested, the requestor`s contentions on each such issue, and a 
summary of any evidence relied upon by the objector. 40 CFR 178.27. A 
request for a hearing will be granted if the Administrator determines 
that the material submitted shows the following: There is a genuine and 
substantial issue of fact; there is a reasonable possibly that 
available evidence identified by the requestor would, if established, 
resolve one or more issues in favor of the requestor, taking into 
account uncontested claims or facts to the contrary; and resolution of 
the factual issue(s) in the manner sought by the requestor would be 
adequate to justify the action requested. 40 CFR 178.32.
    A record has been established for this rulemaking under docket 
number [PP 5F4493/R2205] (including objections and hearing requests 
submitted electronically as described below). A public version of this 
record, including printed, paper versions of electronic comments, which 
does not include any information claimed as CBI, is available for 
inspection from 8 a.m. to 4.30 p.m., Monday through Friday, excluding 
legal holidays. The public record is located in Room 1132 of the Public 
Response and Program Resources Branch, Field Operations Division 
(7506C), Office of Pesticide Programs, Environmental Protection Agency, 
Crystal Mall #2, 1921 Jefferson Davis Highway, Arlington, Va.
    Written objections and hearing requests, identified by the docket 
number [5F4493/R2205] may be submitted to the Hearing Clerk (1900), 
Environmental Protection Agency, Rm 3708, 401 M St. SW., Washington, DC 
20460. A copy of electronic objections and hearing requests filed with 
the Hearing Clerk can be sent directly to EPA at:
    opp-D[email protected]
    A copy of electronic objections and hearing requests filed with the 
Hearing Clerk must be submitted as an ASCII file avoiding the use of 
special characters and any form of encryption.
    The official record for this rulemaking, as well as the public 
version, as described above will be kept in paper form. Accordingly, 
EPA will transfer any objections and hearing requests received 
electronically into printed, paper form as they are received and will 
place the paper copies in the rulemaking record which will also include 
all objections and hearing requests submitted directly in writing. The 
official record is the paper record maintained at the address in 
``ADDRESSES'' at the beginning of this document.
    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to review by the Office of Management and Budget 
(OMB) and the requirements of the Executive Order. Under section 3(f), 
the order defines a ``significant regulatory action'' as an action that 
is likely to result in a rule (1) having an annual effect on the 
economy of $100 million or more, or adversely and materially affecting 
a sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities (also referred to as ``economically 
significant''); (2) creating serious inconsistency or otherwise 
interfering with an action taken or planned by another agency; (3) 
materially altering the budgetary impacts of entitlement, grants, user 
fees, or loan programs or the rights and obligation of recipients 
thereof; or (4) raising novel legal orpolicy issues arising out of 
legal mandates, the President`s priorities, or the principles set forth 
in this Executive Order.
    Pursuant to the terms of the Executive Order, EPA has determined 
that this rule is not ``significant'' and is therefore not subject to 
ORB review.
    Pursuant to the requirements of the Regulatory Flexibility Act 
(Pub. L. 96-354, 94 Stat. 1164, 5 U.S.C. 601-612), the Administrator 
has determined that regulations establishing new tolerances or raising 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant impact on a substantial number of small 
entities. A certification statement to this effect was published in the 
Federal Register of May 4, 1981 (46 FR 24950).

List of Subjects in 40 CFR Part 180

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Pesticides 

[[Page 7732]]
and pests, Reporting and recordkeeping requirements.

    Dated: February 20, 1996.

Stephen L. Johnson,

Director, Registration Division, Office of Pesticide Programs.

    Therefore, chapter I, part 180 of title 40 of the Code of Federal 
Regulations is amended as follows:

PART 180--[AMENDED]

    1. The authority citation for part 180 continues to read as 
follows:
    Authority: 21 U.S.C. a and 371.

    2. In Sec. 180.364, by amending the table in paragraph (d) by 
alphabetically adding the raw agricultural commodity ``cotton gin 
byproducts'' to read as follows:

Sec. 180.364  Glyphosate; tolerances for residues.

*    *    *    *    *
    (d) *  *  *

------------------------------------------------------------------------
                                                               Parts per
                          Commodity                             million 
------------------------------------------------------------------------
                                                                        
                  *        *        *        *        *                 
Cotton gin byproducts........................................    100.0  
                                                                        
                  *        *        *        *        *                 
------------------------------------------------------------------------

[FR Doc. 96-4395 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-4392 Imidacloprid; Pesticide Tolerances
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7734-7736]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4392]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 180 and 186

[PP 3F4169 and FAP 3H5655/R2200; FRL-4996-2]
RIN 2070-AC78

Imidacloprid; Pesticide Tolerances

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is establishing permanent tolerances for residues of the 
insecticide (1-[(6-chloro-3-pyridinyl)methyl]-N-nitro-2-
imidazolidinimine) (also known as imidacloprid) and it metabolites in 
or on cottonseed and cotton gin byproducts, revoking the existing feed 
additive tolerance for imidacloprid on cotton meal, and establishing a 
maximum residue limit for imidacloprid on cottonseed meal. Bayer 
Corporation (formerly Miles, Inc.) submitted petitions pursuant to the 
Federal Food, Drug and Cosmetic Act (FFDCA) requesting these 
regulations to establish certain maximum permissible levels for 
residues of the insecticide.
EFFECTIVE DATE: This regulation is effective on February 15, 1996.

ADDRESSES: Written objections and hearing requests, identified by the 
document control number, [PP 3F4169 and FAP 3H5655/R2200, may be 
submitted to: Hearing Clerk (1900), Environmental Protection Agency, 
Rm. M3708, 401 M St., SW., Washington, DC 20460. A copy of any 
objections and hearing requests filed with the Hearing Clerk should be 
identified by the document control number and submitted to: Public 
Response and Program Resources Branch, Field Operations Division 
(7506C), Office of Pesticide Programs, Environmental Protection Agency, 
401 M St., SW., Washington , DC 20460. In person, bring copy of 
objections and hearing requests to Rm. 1132, CM #2, 1921 Jefferson 
Davis Hwy., Arlington, VA 22202. Fees accompanying objections shall be 
labeled ``Tolerance Petition Fees'' and forwarded to: EPA Headquarters 
Accounting Operations Branch, OPP (Tolerance Fees), P.O. Box 360277M, 

[[Page 7735]]
Pittsburgh, PA 15251. An electronic copy of objections and hearing 
requests filed with the Hearing Clerk may be submitted to OPP by 
sending electronic mail (e-mail) to:[email protected]. Copies 
of electronic objections and hearing requests must be submitted as an 
ASCII file avoiding the use of special characters and any form of 
encryption. Copies of electronic objections and hearing requests will 
also be accepted on disks in WordPerfect 5.1 file format or ASCII file 
format. All copies of electronic objections and hearing requests must 
be identified by the docket number [PP 3F4169 and FAP 3H5655/R2200. No 
Confidential Business Information (CBI) should be submitted through e-
mail. Copies of electronic objections and hearing requests on this rule 
may be filed online at many Federal Depository Libraries. Additional 
information on electronic submissions can be found below in this 
document.

FOR FURTHER INFORMATION CONTACT: By mail: Dennis H. Edwards, Jr., 
Product Manager (PM) 19, Registration Division (7505C), Office of 
Pesticide Programs, Environmental Protection Agency, 401 M St., SW., 
Washington, DC 20460. Office location and telephone number: Rm. 207, CM 
#2, 1921 Jefferson Davis Hwy., Arlington, VA 22202, (703)-305-6386; 
email: [email protected].
SUPPLEMENTARY INFORMATION: In the Federal Register of December 6, 1995, 
(60 FR 62366), EPA issued a proposed rule pursuant to petitions from 
Bayer Corporation (formerly Miles, Inc.) to section 408 of the Federal 
Food, Drug and Cosmetic Act (FFDCA), 21 U.S.C. 346a(e). EPA proposed 
permanent tolerances for residues of the insecticide (1-[(6-chloro-3-
pyridinyl)methyl]-N-nitro-2-imidazolidinimine (also known as 
imidacloprid) and its metabolites in or on cottonseed and cotton gin 
byproduct, to revoke the existing feed additive tolerance for 
imidacloprid on cotton meal, and to establish a maximum residue limit 
for imidacloprid on cottonseed.
    There were no comments or request for referral to an advisory 
committee received in response to the proposed rule.
    This pesticide is considered useful for the purposes for which the 
tolerances are sought. Based on the information and data considered, 
the Agency has determined that the tolerances established by amending 
40 CFR part 180 would protect the public health. Therefore, the 
tolerances are established as set forth below.
    Any person adversely affected by this regulation may, within 30 
days after publication of this document in the Federal Register, file 
written objections and/or request a hearing with the Hearing Clerk, at 
the address given above (40 CFR 178.20). A copy of the objections and/
or hearing requests filed with the Hearing Clerk should be submitted to 
the OPP docket for this rulemaking. The objections submitted must 
specify the provisions of the regulation deemed objectionable and the 
grounds for the objections (40 CFR 178.25). Each objection must be 
accompanied by the fee prescribed by 40 CFR 180.33(i). If a hearing is 
requested, the objections must include a statement of the factual 
issue(s) on which a hearing is requested, the requestor's contentions 
on such issues, and a summary of any evidence relied upon by the 
objector (40 CFR 178.27). A request for a hearing will be granted if 
the Administrator determines that the material submitted shows the 
following: There is a genuine and substantial issue of fact; there is a 
reasonable possibility that available evidence identified by the 
requestor would, if established, resolve one or more of such issues in 
favor of the requestor, taking into account uncontested claims or facts 
to the contrary; and resolution of the factual issue(s) in the manner 
sought by the requestor would be adequate to justify the action 
requested (40 CFR 178.32).
     A record has been established for this rulemaking under docket 
number [PP 3F4169 and FAP 3H5655/R2200] (including any objections and 
hearing requests submitted electronically as described below). A public 
version of this record, including printed, paper versions of electronic 
comments, which does not include any information claimed as CBI, is 
available for inspection from 8 a.m. to 4:30 p.m., Monday through 
Friday, excluding legal holidays. The public record is located in Room 
1132 of the Public Response and Program Resources Branch, Field 
Operations Division (7506C), Office of Pesticide Programs, 
Environmental Protection Agency, Crystal Mall #2, 1921 Jefferson Davis 
Highway, Arlington, VA.
    Written objections and hearing requests, identified by the document 
control number [PP 3F4169 and FAP 3H5655/R2200], may be submitted to 
the Hearing Clerk (1900), Environmental Protection Agency, Rm. 3708, 
401 M St., SW., Washington, DC 20460.
    A copy of electronic objections and hearing requests filed with the 
Hearing Clerk can be sent directly to EPA at:
    opp-D[email protected]

    A copy of electronic objections and hearing requests filed with the 
Hearing Clerk must be submitted as an ASCII file avoiding the use of 
special characters and any form of encryption.
    The official record for this rulemaking, as well as the public 
version, as described above will be kept in paper form. Accordingly, 
EPA will transfer any objections and hearing requests received 
electronically into printed, paper form as they are received and will 
place the paper copies in the official rulemaking record which will 
also include all objections and hearing requests submitted directly in 
writing. The official rulemaking record is the paper record maintained 
at the address in ``ADDRESSES'' at the beginning of this document.
    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to all the requirements of the Executive Order 
(i.e., Regulatory Impact Analysis, review by the Office of Management 
and Budget (OMB)). Under section 3(f), the order defines 
``significant'' as those actions likely to lead to a rule (1) having an 
annual effect on the economy of $100 million or more, or adversely and 
materially affecting a sector of the economy, productivity, 
competition, jobs, the environment, public health or safety, or State, 
local, or tribal governments or communities (also known as 
``economically significant''); (2) creating serious inconsistency or 
otherwise interfering with an action taken or planned by another 
agency; (3) materially altering the budgetary impacts of entitlement, 
grants, user fees, or loan programs; or (4) raising novel legal or 
policy issues arising out of legal mandates, the President's 
priorities, or the principles set forth in this Executive Order.
    Pursuant to the terms of this Executive Order, EPA has determined 
that this rule is not ``significant'' and is therefore not subject to 
OMB review.
    Pursuant to the requirements of the Regulatory Flexibility Act 
(Pub. L. 96-354, 94 Stat. 1164, 5 U.S.C. 601-612), the Administrator 
has determined that regulations establishing new tolerances or raising 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant economic impact on a substantial number of 
small entities. A certification statement to this effect was published 
in the Federal Register of May 4, 1981 (46 FR 24950). 

[[Page 7736]]

List of Subjects in 40 CFR Parts 180 and 186

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Feed additives, Pesticides and pests, 
Reporting and recordkeeping requirements.

    Dated: February 15, 1996.

Stephen L. Johnson,

Director, Registration Division, Office of Pesticide Programs.

    Therefore, 40 CFR parts 180 and 186 are amended as follows:

PART 180--[AMENDED]

    1. In part 180:
    a. The authority citation for part 180 continues to read as 
follows:
    Authority: 21 U.S.C. 346a and 371.

    b. In Sec. 180.472, by amending the table in paragraph (a) by 
adding and alphabetically inserting the following new entries and by 
removing and reserving paragraph (b), to read as follows:

Sec. 180.472 1-[(6-Chloro-3-pyridinyl)methyl]-N-nitro-2-
imidazolidinimine; tolerances for residues.

    (a) *  *  *

------------------------------------------------------------------------
                                                              Parts per 
                         Commodity                             million  
------------------------------------------------------------------------
                                                                        
                     *    *    *    *    *    *    *                    
Cotton, gin byproducts.....................................          4.0
Cottonseed.................................................          6.0
                                                                        
                     *    *    *    *    *    *    *                    
------------------------------------------------------------------------

    (b) [Reserved]
*    *    *    *    *

PART 186--PESTICIDES IN ANIMAL FEED

    2. In part 186:
    a. By revising the heading of part 186 to read as set forth above.
    b. The authority citation for part 186 is revised to read as 
follows:
    Authority: 21 U.S.C. 342, 348, and 701.

    c. In Sec. 186.900, by revising paragraph (b), to read as follows:

Sec. 186.900  1-[(6-Chloro-3-pyridinyl)methyl]-N-nitro-2-
imidazolinimine; tolerances for residues.

*    *    *    *    *
    (b)(1) A maximum residue level regulation is established for 
residues of the insecticide 1-[(6-choro-3-pryidinyl)methyl]-N-nitro-2-
imidazolidinimine in or on the following feed resulting from 
application of the insecticide to cotton:

------------------------------------------------------------------------
                                                              Parts per 
                            Feed                               million  
------------------------------------------------------------------------
                                                                        
Cottonseed meal............................................          8.0
                                                                        
------------------------------------------------------------------------

    (2) The regulation in paragraph (b)(1) of this section reflects the 
maximum level of residues in cottonseed meal consistent with use of 1-
[(6-chloro-3-pyridinyl) methyl]-N-nitro-2-imidazolidinimine on cotton 
in conformity with Sec. 180.472 of this chapter and with the use of 
good manufacturing practices.
*    *    *    *    *

[FR Doc. 96-4392 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-4274 Response Plans for Marine Transportation-Related Facilities
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7890-7939]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4274]

[[Page 7889]]

_______________________________________________________________________

Part III

Department of Transportation

_______________________________________________________________________

Coast Guard

_______________________________________________________________________

33 CFR Parts 150 and 154

Response Plans for Marine Transportation-Related Facilities; Final Rule

Federal Register / Vol. 61, No. 41 / Thursday, February 29, 1996 / 
Rules and Regulations
=======================================================================
-----------------------------------------------------------------------

[[Page 7890]]

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Parts 150 and 154

[CGD 91-036]
RIN 2115-AD82

Response Plans for Marine Transportation-Related Facilities

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is adopting with some changes, as final, the 
interim final rule which establishes regulations requiring response 
plans for marine transportation-related (MTR) facilities including 
deepwater ports, certain Coast Guard regulated onshore facilities, 
marinas, tank trucks, and railroad tank cars. This final rule also 
adopts with some changes, as final, the interim final rule which 
establishes additional response plan requirements for facilities 
located in Prince William Sound, Alaska, permitted under the Trans-
Alaska Pipeline Authorization Act (TAPAA). These regulations are 
mandated by the Federal Water Pollution Control Act (FWPCA), as amended 
by the Oil Pollution Act of 1990 (OPA 90). The purpose of requiring 
facility response plans is to enhance private sector planning and 
response capabilities to minimize the environmental impact of spilled 
oil.

EFFECTIVE DATE: May 29, 1996.

ADDRESSES: Unless otherwise indicated, documents referred to in this 
preamble are available for inspection or copying at the office of the 
Executive Secretary, Marine Safety Council (G-LRA/3406) (CGD 91-036), 
U.S. Coast Guard Headquarters, 2100 Second Street SW., room 3406, 
Washington, DC 20593-0001, between 8 a.m. and 3 p.m., Monday through 
Friday, except Federal holidays. The telephone number is (202) 267-
1477.

FOR FURTHER INFORMATION CONTACT:
LCDR Walter (Bud) Hunt, Response Division (G-MEP), (202) 267-0441. This 
telephone is equipped to record messages on a 24-hour basis.

SUPPLEMENTARY INFORMATION:

Drafting Information

    The principal persons involved in drafting this document are LT 
Cliff Thomas, Project Manager, Standards Evaluation Branch (G-MES-2), 
and Jacqueline Sullivan, Project Counsel, Office of Chief Counsel (G-
LRA).

Regulatory History

    On March 11, 1992 the Coast Guard published an advance notice of 
proposed rulemaking (ANPRM) in the Federal Register (57 FR 8708) 
entitled ``Facility Response Plans.'' The ANPRM discussed the 
background, statutory requirements of section 311(j) of the FWPCA, and 
possible regulatory approaches. In addition, the ANPRM posed questions 
for public comment. The Coast Guard received 116 comments.
    On June 19, 1992, the Coast Guard published a notice of proposed 
rulemaking (NPRM) on the related rulemaking project Vessel Response 
Plans (VRP) (57 FR 27514). The Coast Guard also gathered public input 
on the proposed VRP rule through the Oil Spill Response Plan Negotiated 
Rulemaking Committee. Twenty-six organizations and the Coast Guard were 
members of the Committee. To maintain consistency between the two 
regulations, this rule uses certain concepts developed in the VRP NPRM 
and negotiated rulemaking committee.
    The Coast Guard released Navigation and Vessel Inspection Circular 
(NVIC) No. 7-92 on September 15, 1992. NVIC No. 7-92 provided immediate 
guidance to the marine industry for preparing facility response plans 
to meet the February 1993 deadline established by the Oil Pollution Act 
of 1990 (OPA 90).
    On February 5, 1993, the Coast Guard published an Interim Final 
Rule (IFR) entitled ``Response Plans for Marine Transportation-Related 
Facilities'' in the Federal Register (58 FR 7330). The Coast Guard 
received 55 comments on the IFR. These comments were considered in 
developing this final rule.

Background and Purpose

    In response to several recent major oil spills, Congress passed the 
Oil Pollution Act of 1990 (OPA 90) (Pub. L. 101-380). OPA 90 amended 
section 311(j) of the Federal Water Pollution Control Act (FWPCA) (33 
U.S.C. 1321(j)). It established requirements, and an implementation 
schedule, for facility response plans and periodic inspections of 
discharge-removal equipment.
    As amended by OPA 90, section 311(j)(5) directs the President to 
issue regulations implementing the new FWPCA requirements for facility 
response plans. The President delegated this authority, in part, to the 
Secretary of Transportation (DOT) by Executive Order 12777 (3 CFR, 1991 
Comp.; 56 FR 54757). The Secretary of Transportation, in 49 CFR 1.46(m) 
(57 FR 8581; March 11, 1992), further delegated, to the Commandant of 
the Coast Guard, the authority to regulate marine transportation-
related (MTR) onshore facilities, and deepwater ports subject to the 
Deepwater Ports Act of 1974, as amended (33 U.S.C. 1501, et seq.). This 
rule addresses only MTR facilities that handle, store, or transport 
oil. Oil spill response plan regulations for vessels are the subject of 
a separate rulemaking project (CGD 91-034).
    Section 311(a)(1) of the FWPCA defines oil as including, but not 
limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with 
waste other than dredge spoils (33 U.S.C. 1321(a)(1)). While the most 
common oils are the various petroleum oils (e.g., crude oil, gasoline, 
diesel, etc.), non-petroleum oils such as animal fats (e.g., tallow, 
lard, etc.), vegetable oils (e.g., corn oil, sunflower seed oil, palm 
oil, etc.), and other non-petroleum oils, such as turpentine, are 
included within the ambit of this regulation when handled, stored or 
transported by an MTR facility.
    A major objective of the OPA 90 amendments to the FWPCA was to 
create a national planning and response system. OPA 90 requires the 
President to develop nationwide criteria for determining those 
facilities which could reasonably be expected to cause substantial harm 
to the environment. The OPA 90 Conference Report (Report 101-653) 
states that the criteria should result in a broad requirement for 
facility owners or operators to prepare and submit response plans. 
Those facilities identified by the President are required to submit 
response plans.
    Section 311(j)(5) of the FWPCA requires the preparation and 
submission of response plans from all onshore facilities that could 
reasonably be expected to cause either ``substantial'' or ``significant 
and substantial'' harm to the environment by discharging oil into or on 
the navigable waters, adjoining shorelines, or exclusive economic zone 
of the United States. Response plans must also be consistent with the 
National Oil and Hazardous Substances Pollution Contingency Plan (NCP) 
(40 CFR part 300) and applicable Area Contingency Plans (ACPs).
    Section 311(j)(5) also requires that, in a facility response plan, 
an owner or operator identify and ensure by contract or other means 
approved by the President the availability of private personnel and 
equipment sufficient to remove, to the maximum extent practicable, a 
worst case discharge and to mitigate or prevent substantial threat of 
such a discharge.
    Section 311(j)(5)(F) of the FWPCA allows the Coast Guard to 
authorize an MTR facility requiring plan approval to 

[[Page 7891]]
operate for up to 2 years after a plan is submitted for approval. This 
provides an interim period in which the facility may continue to 
operate while the plan approval process is completed.
    Section 5005 of OPA 90 establishes requirements for response plans 
for MTR facilities located in Prince William Sound, Alaska, which are 
permitted under the Trans-Alaska Pipeline Authorization Act (TAPAA) (43 
U.S.C. 1651, et seq.). This section requires a higher level of 
preparedness for facilities in Prince William Sound in order to provide 
an even greater margin of safety.
    Although OPA 90 requires response plans for oil or hazardous 
substance spills, section 4202(b)(4) establishes an implementation 
schedule only for oil spill response plans. Response plans for 
hazardous substance spills will be the subject of a separate 
rulemaking.

Discussion of Comments and Changes

    The Coast Guard received 55 comments on the IFR. The following 
discussion summarizes the comments and explains substantive changes 
made to the regulation in response to the comments. Comments are 
categorized by the specific section of the IFR to which they apply. In 
addition to these changes, editorial changes have been made to clarify 
the rule or standardize terminology. The following sections have 
changes which are purely editorial: Secs. 154.1010, 154.1017, 154.1030, 
154.1047, 154.1050, 154.1070, 154.1075, 154.1125, and appendix C, 
sections 1, 3, 4, 5, 7, and 8. The following sections were not changed: 
Secs. 154.1028, 154.1029, 154.1041, 154.1057, 154.1115, 154.1130, 
154.1135, 154.1140 and appendix C, sections 6 and 9 and Tables 1-5. For 
the convenience of the public, the Coast Guard has reprinted subparts F 
and G of part 154 in their entirety, including both changed and 
unchanged sections. Two new subparts H and I have also been added to 
part 154.

General Comments

    One comment argued that the regulations do not consider economic 
reasonableness, overstep the intent of Congress in their scope and 
essentially place the entire burden for cleanup on owners and operators 
of facilities. The Coast Guard disagrees. The primary intent of the 
response planning portions of OPA 90 was to require that facility 
owners or operators identify and ensure, by contract or other approved 
means, the availability of private personnel and equipment to remove a 
worst case discharge. The Coast Guard has considered the economic costs 
of this final rule and they are summarized in this preamble in the 
section entitled ``Assessment.''
    Regulatory consistency. The Coast Guard received 16 comments urging 
regulatory consistency in the development of these regulations. All of 
these comments stated that there should be consistency with the other 
regulations issued under OPA 90. One of these comments also recommended 
the establishment of an interagency working group to identify which 
sections of rules should be consistent and work toward achieving that 
consistency. Another of these comments also urged that response plan 
requirements should be amended to resemble EPA's requirements more 
closely but that the Coast guard's requirements should have a much 
closer focus on emergency response. The Coast Guard, EPA, and other 
Federal agencies met repeatedly throughout the development of each 
agency's rules. This coordination has produced significant similarities 
between agencies issuing response plan rules. For example, the Coast 
Guard and EPA have adopted the same requirements with respect to 
planning volumes, amounts of response equipment, and the use of 
dispersants, and other similar new or unconventional spill mitigation 
techniques including mechanical dispersal.
    Public Participation. Six comments addressed concerns of public 
participation in the process of this rulemaking. Four comments argued 
that the Coast Guard should have issued an NPRM instead of an IFR to 
facilitate public comment. The IFR was issued to meet OPA 90's deadline 
for implementing these oil pollution rules. Public comment to the IFR 
has been considered in the development of this final rule.
    One comment argued that the IFR did not meet the requirements of 
OPA 90 for public input regarding the adequacy of the plans because it 
does not provide for notification of plan receipt by the Coast Guard; 
supplying copies of the plans to interested people; making copies of 
the plans available in a central location for public review; or 
allowing the public to appeal Coast Guard decisions on deficiencies or 
classification.
    The Coast Guard concludes that there is no requirement contained in 
OPA 90 for the public to determine the adequacy of individual response 
plans from onshore or offshore facilities. Along with Federal, state, 
and local government representatives who are responsible for 
coordinating environmental issues and emergency response operations, 
the Coast Guard has encouraged Area Committees to include environmental 
groups, representatives from academia, and concerned citizens. The 
Coast Guard concludes that this is an appropriate method for private 
citizens to provide advice, guidance, and expertise to the Area 
Committee and will result in a coordinated community response to an oil 
discharge.
    This same comment requested a public hearing and the establishment 
of a negotiated rulemaking committee for this regulation. The Coast 
Guard established an Oil Spill Response Plan Negotiated Rulemaking 
Committee (56 FR 58202, November 18, 1991). The Coast Guard used 
information in the final report provided by the Committee in the 
drafting of the VRP Rule (CGD 91-036) and this rule. The Coast Guard 
finds it unnecessary to conduct a separate negotiated rulemaking for 
the Facility Response Plan (FRP) rule.
    Clarification. Two comments requested general clarification of the 
IFR. One comment stated that the regulations must be clarified in many 
respects to avoid differences of interpretation. The other comment was 
concerned with words in the regulations having different meanings from 
their accepted meanings. The Coast Guard recognizes these concerns and 
has strived for clarity in this final rule. For example, in this final 
rule, the Coast Guard has added definitions of the terms ``complex'', 
``tier'', and ``fish and wildlife and sensitive environment''. It has 
also issued guidance to response plan reviewers to assure uniform 
understanding and enforcement of response plan requirements.
    Agency jurisdiction. Two comments addressed the issue of 
jurisdictional conflicts between agencies. One comment asserted that 
there is an overlap in Coast Guard and Research and Special Programs 
Administration (RSPA) authority over pipelines. This comment argued 
that pipelines used only for transporting fuel between tanks and 
vessels were previously subject only to Coast Guard jurisdiction. 
However, this comment argues, new RSPA regulations now apply to all 
pipelines. This comment contended that such regulation conflicts with 
the delegation of authority in E.O. 12777 giving RSPA authority over 
non-MTR pipelines only.
    Executive Order 12777 delegated to the Secretary of Transportation 
responsibility for the issuance of regulations requiring the owner or 
operator of a transportation-related onshore facility and deepwater 
ports to prepare and submit response plans. The Secretary delegated to 
the Commandant of the Coast Guard the responsibility for 

[[Page 7892]]
the issuance of regulations requiring the owner or operator of a marine 
transportation-related onshore facility and deepwater ports to prepare 
and submit response plans. The Secretary delegated to the Administrator 
of RSPA the same authority for non-marine transportation-related 
pipelines. The Coast Guard finds that there is no conflict over 
jurisdiction.

Section 150.129  Response Plans

    The Coast Guard received one comment on this section. The comment 
requested that the Coast Guard clarify the submission requirements for 
deepwater ports. Under the IFR, the Coast Guard determined that 
deepwater ports are significant and substantial harm facilities under 
Sec. 154.1015 and, therefore, are required to submit a response plan 
for review and approval. The Coast Guard finds that the submission 
requirements are clear and, therefore, has made no changes to the final 
rule on the classification of deepwater ports.

Section 154.106  Incorporation by Reference

    The Coast Guard received one comment on this section. The comment 
stressed that the Coast Guard should review the standard test methods 
developed by the American Society of Testing Materials (ASTM) that are 
incorporated by reference in this section as the standards are revised. 
The Coast Guard intends to review any revisions to these standards and 
will conduct appropriate rulemaking to revise this section if warranted 
by changes to these standards.

Section 154.1010  Purpose

    The Coast Guard received several comments requesting clarification 
of this section. In response to these comments, the Coast Guard has 
revised this section to clarify the purpose of response plans.

Section 154.1015  Applicability

    The Coast Guard received eight comments on this section of the IFR. 
Three comments argued that the classification of facilities should not 
be determined solely by the amount of oil that a facility is capable of 
transferring. The comments stated that other factors such as a 
facility's spill history, proximity to fish and wildlife and sensitive 
environments, presence of containment structures, and potential worst 
case discharge should be considered in the classification of 
facilities.
    The IFR reflects the Coast Guard determination that all MTR 
facilities that transfer oil to or from a vessel with a capacity of 250 
barrels or more could reasonably be expected to cause at least 
substantial harm to the environment, and that large fixed facilities 
and deepwater ports could reasonably be expected to cause significant 
and substantial harm to the environment in the case of an oil 
discharge. If a facility owner or operator believes that his or her 
facility should be reclassified from significant and substantial harm 
to substantial harm or excluded from the substantial harm category 
based on factors other than the facility's capacity for transferring 
oil, then under Sec. 154.1075 the facility owner or operator is 
permitted to appeal the classification to the COTP and then to the 
District Commander, and then to the Commandant. There have been no 
changes in these provisions in the final rule.
    Although the Coast Guard has not changed the final rule to reflect 
the consideration of factors other than the facility's type and its 
capacity for transferring oil in the classification of the facility, 
the Coast Guard has modified the threshold for the initial 
classification of significant and substantial harm facilities in the 
final rule, thereby decreasing the number of facilities which will be 
classified as significant and substantial harm facilities. The Coast 
Guard has identified several fixed MTR facilities which are segments of 
non-MTR facilities that have a total storage capacity of less than 
42,000 gallons. The Environmental Protection Agency (EPA) has 
determined that such non-transportation related facilities with a 
storage capacity of less than 42,000 gallons associated with a MTR 
facility are not considered as substantial harm facilities. However, 
these MTR facilities are capable of transferring oil to or from a 
vessel with a capacity of 250 barrels or more. The Coast Guard has 
determined that these facilities could reasonably be expected to cause 
substantial harm to the environment. These facilities must still submit 
response plans; however, they are no longer classified as ``significant 
and substantial harm'' facilities. Paragraph (c)(1) of Sec. 154.1015 
has been amended to incorporate this change.
    One comment suggested that facilities that transfer only oily water 
mixtures should be classified as substantial harm facilities. The Coast 
Guard disagrees. Although a facility may transfer only oil that is 
mixed with water, the facility may transfer enough oil to reasonably be 
expected to cause significant and substantial harm to the environment 
if a discharge were to occur.
    Another comment stated that the Coast Guard should clarify that 
mobile facilities are the only facilities that are not classified as 
significant and substantial harm facilities. Under the IFR, mobile 
facilities are the only facilities which initially are classified only 
as substantial harm facilities; however, under Sec. 154.1016, the COTP 
may determine that other facilities may reasonably be expected to cause 
substantial harm to the environment and may upgrade mobile MTR 
facilities to significant and substantial harm facilities. 
Additionally, the amended paragraph (c)(1) of Sec. 154.1015 of the 
final rule, which modifies the threshold for significant and 
substantial harm facilities, has increased the number of facilities 
that will initially be classified only as substantial harm facilities.
    One comment suggested that the Coast Guard provide guidance on how 
to determine whether a facility is part of a complex. A facility is 
part of a complex if the entire facility is regulated by more than one 
Federal agency under section 311(j) of the FWPCA. Most MTR facilities 
are part of a larger facility that has segments which are regulated by 
agencies such as EPA, RSPA or the Minerals Management Service (MMS). If 
a facility owner or operator is unable to determine whether his or her 
facility is part of a complex, he or she may request guidance from the 
COTP.
    Two comments contended that the regulation should not apply to non-
petroleum oils. One comment specifically stated that the regulation 
should not apply to facilities which handle animal and vegetable oils 
because these oils are not toxic to the environment. The Coast Guard 
disagrees. The response planning requirements of this regulation were 
developed to ensure that facility owners or operators are prepared to 
respond to an oil spill originating from their facility, regardless of 
the type of oil spilled. The Coast Guard recognizes that certain non-
petroleum oils, including certain animal fats and vegetable oils, are 
non-toxic in the marine environment; however, lethal acute aquatic 
toxicity is not the sole factor considered in determining harm to the 
environment. A discharge of animal fats or vegetable oils may cause 
chronic effects for waterfowl and aquatic organisms. Proper response 
planning for a discharge of non-petroleum oils will have a significant 
effect in limiting harm to the environment. Therefore, facility owners 
or operators handling non-petroleum oils at their facility are required 
to prepare response plans under this regulation.

[[Page 7893]]

    The Coast Guard has determined, based upon comments, that animal 
fats and vegetable oils, and other non-petroleum oils will be addressed 
separately from petroleum oils, and from one another, in the final 
rule. The final rule removes the response planning requirements for 
animal fats and vegetable oils, and other non-petroleum oils from 
Sec. 154.1049 in the IFR and establishes two new subparts H and I, 
containing requirements for these oils. Subpart H contains requirements 
for animal fats and vegetable oils, while subpart I contains 
requirements for other non-petroleum oils. Although new subparts have 
been established for animal fats and vegetable oils, and other non-
petroleum oils, the response planning requirements for these oils are 
not changed in the final rule.
    One comment stated that a facility that is capable of transferring 
oil to or from a vessel with a capacity of 250 barrels or more, but 
that does not transfer to a vessel of this size should not be required 
to submit a response plan. Although the Coast Guard has not lowered the 
threshold for substantial harm facilities in the final rule, the 
revised final rule permits the COTP to downgrade a facility. The COTP 
is in the position to evaluate the individual situation of each 
facility under his or her jurisdiction with respect to operational 
history and other factors which would affect the facility's 
classification. The COTP may downgrade a facility's classification, 
acting either on his own or upon request of the facility's owner or 
operator, if he finds that such action is warranted.

Section 154.1016  Facility Classification by COTP

    The Coast Guard received four comments on this section. One comment 
stated that the COTP should not be permitted to upgrade a facility 
based on the facility's proximity to areas of economic importance and 
environmental sensitivity. The comment contended that OPA 90 does not 
permit such an action. Another comment stated that a facility's spill 
history does not indicate that the facility is at greater risk for 
future spills and, therefore, spill history should not be considered in 
determining a facility's classification. The Coast Guard disagrees. OPA 
90 permits the Coast Guard to require response plans for facilities 
that could reasonably be expected to cause substantial harm and 
significant and substantial harm to the environment. OPA 90 does not 
define these terms; therefore, the Coast Guard must determine the 
criteria used to distinguish these facilities. The Coast Guard has 
adopted EPA's term ``fish and wildlife and sensitive environments'' to 
refer to areas of environmental sensitivity. The Coast Guard has 
concluded that a facility's proximity to fish and wildlife and 
sensitive environments and its spill history are relevant factors in 
determining whether a facility could reasonably be expected to cause 
substantial harm or significant and substantial harm to the environment 
in the case of an oil discharge.
    Two comments stated that a facility owner or operator should be 
permitted to appeal the COTP's decision to upgrade a facility. Under 
Sec. 154.1075 of the IFR, a facility owner or operator is permitted to 
request the COTP to review the initial facility classification. The 
owner or operator may submit relevant data to the COTP to support his 
or her argument. If the owner or operator is dissatisfied with the 
COTP's decision, the owner or operator may appeal the decision to the 
District Commander. The decision of the District Commander may be 
appealed to the Commandant. This appeals provision is unchanged in the 
final rule.
    Under the IFR, the COTP was permitted only to upgrade a facility's 
initial classification. Under the final rule, the COTP is permitted to 
upgrade or downgrade the facility's classification. Upon written 
request from the facility owner or operator to review the facility's 
classification, the COTP may downgrade a facility from significant and 
substantial harm to substantial harm or from substantial harm to a 
status in which it is exempt from the regulation. This provides the 
COTP with greater latitude to appropriately regulate his or her port 
area. This change has prompted the renaming of this section to 
``Facility Classification by COTP'' in the final rule.

Section 154.1017  Response Plan Submission Requirement

    The Coast Guard received many comments on this section of the IFR. 
Four comments requested the Coast Guard to clarify whether the FRP 
regulations apply to inactive facilities. Under Sec. 154.100(a), the 
applicability section for part 154, facilities in caretaker status are 
exempt from the requirements of this part, with the exception of 
certain safety requirements set out in Sec. 154.735.
    Two comments stated that facility complexes should not be required 
to submit response plans to more than one Federal agency for approval. 
The comments further stated that all facilities that transfer oil over 
water should be regulated exclusively by the Coast Guard. The Coast 
Guard recognizes that submitting plans to several agencies for approval 
may have been burdensome for those facilities whose options 
necessitated submission of response plans to more than one Federal 
agency. The initial delegation under Executive Order 12777 to issue 
regulations and review and approve response plan to multiple Federal 
agencies reflected agency expertise in the regulated industries and the 
traditional jurisdiction of Federal agencies under section 311 of the 
FWPCA. This delegation provided each agency with the opportunity to 
review response plans and to ensure that the plans reflected industry 
practices and were in compliance with statutory requirements.
    Today, virtually every facility required to submit response plans 
has already done so in compliance with the rules promulgated by the 
appropriate agency. It has become apparent that some response plans 
unnecessarily duplicate information contained in other plans. Federal 
agencies are interested in streamlining the response plan preparation 
and submission procedures to reduce significantly the burden when plan 
revision and resubmission is required. The Coast Guard believes that 
the ``One Plan'' or Integrated Contingency Planning concept has merit 
and discussions are ongoing between industry, the appropriate Federal 
agencies, and members of the National Response Team (NRT). The NRT is 
developing guidance for preparation of integrated response plans that 
will satisfy the regulatory requirements of various Federal agencies 
while avoiding unnecessary and confusing duplication of standard 
response procedures and organizational details. With the completion of 
guidance on Integrated Contingency Planning, the Coast Guard will 
accept plans developed in accordance with that guidance. The NRT is 
also examining the feasibility of vesting response plan review in the 
On Scene Coordinator. The NRT is discussing minimizing the number of 
Federal agencies involved in reviewing a response plan for those 
facilities that, due to their diverse nature, may have to prepare and 
submit a response plan to more than one Federal agency. The Coast Guard 
is committed to working with the NRT on these issues and working to 
minimize the regulatory burden on facilities that have marine 
transportation-related mode and non-transportation-related components.

[[Page 7894]]

Section 154.1020  Definitions

    The Coast Guard received many comments on the definitions of the 
terms used in the IFR. Some comments suggested clarification of certain 
terms while others suggested the addition of terms. The following 
discussion addresses only those definitions or issues on which the 
Coast Guard received comment or made significant revisions.
    Adverse weather. The Coast Guard received one comment on ``adverse 
weather'' which suggested that wind, tides, and the number of daylight 
hours be included as three additional environmental factors that 
contribute to adverse weather conditions for a spill response. The 
Coast Guard did not intend the listed conditions to be exclusive. To 
address this comment's concern, the Coast Guard is adding language to 
the definition of ``adverse weather'' to indicate that other relevant 
factors including wind, tides, etc., should also be taken into account 
when identifying response systems and equipment.
    Availability (of response resources). The Coast Guard received one 
comment which requested that this term be defined. The comment stated 
that the definition should indicate that response organizations often 
have contracts with many facilities and, as a result, there may be 
instances where the contractor's obligations to one facility may limit 
its ability to arrive at the scene of an oil spill at another facility 
within the specified times. The Coast Guard recognizes that actual 
availability of response resources may be limited by unforeseeable 
events such as multiple, simultaneous oil spills. The Coast Guard 
stresses that the requirements are not performance standards. They are 
intended to be used to develop a plan for responding to a discharge of 
oil to the maximum extent practicable in the existing conditions. The 
Coast Guard recognizes that actual conditions may not permit the 
arrival of resources within the prescribed timelines. The Coast Guard 
concludes that there is no need to provide a definition.
    Complex. The Coast Guard received one comment suggesting that it 
clarify the meaning of ``complex'' and that the Coast Guard definition 
be consistent with the definition in EPA regulations. A ``complex'' is 
composed of facilities regulated by two or more Federal agencies, and 
that are used, or intended to be used, to transfer oil to or from a 
vessel. A ``complex'' may include marine transportation-related 
portions and other non-marine transportation-related portions. The 
Coast Guard has included a definition that is consistent with the FWPCA 
and applicable EPA regulations.
    Consistency with EPA regulations. Two comments stated that the 
definitions in the Coast Guard regulation should be consistent with 
those in the EPA regulation. Wherever relevant, the Coast Guard has 
consulted other agencies and their regulations to ensure that the Coast 
Guard's OPA 90 regulations do not conflict with those of other 
agencies. Occasionally, the Coast Guard's definitions diverge from 
similar definitions of other agencies. In those cases, the Coast Guard 
has examined the other agency regulations and decided upon a different 
approach for legal, policy, or technical reasons.
    Environmentally Sensitive Area. The Coast Guard received one 
comment suggesting that it add a definition of the term 
``environmentally sensitive area'' to be consistent with EPA 
regulations, the NCP, and OPA 90. The EPA has adopted the term ``fish 
and wildlife and sensitive environment.'' For consistency, the Coast 
Guard is adopting EPA's term and its definition. However, the Coast 
Guard is adding economically important areas to the EPA definition. OPA 
90 requires that response plans be consistent with the applicable Area 
Contingency Plan (ACP). The ACPs are prepared by Area Committees 
composed of qualified personnel from Federal, State and local agencies. 
The Coast Guard has provided guidance to the Area Committees on the 
preparation of ACPs. Coastal ACPs have been prepared and are available 
for preparation of facility response plans. The Area Committees 
identify, and prioritize for protection, specific locations that fall 
under the category ``fish and wildlife and sensitive environments.'' 
The ACPs will be revised annually and will identify areas of economic 
importance. The completed fish and wildlife and sensitive environments 
plans will likely be geographic-specific annexes to the ACPs. The 
National Oceanic and Atmospheric Administration (NOAA) published a 
notice in the Federal Register on March 29, 1994 entitled ``Guidance 
for Facility and Vessel Response Plans Fish and Wildlife and Sensitive 
Environments.'' (59 FR 14714) NOAA's notice provides detailed guidance 
which facility and vessel owners may use to supplement the information 
contained in the applicable Coast Guard regulations. However, the ACP 
will still be used to make the final determination regarding fish and 
wildlife and sensitive environments.
    Full-scale. The Coast Guard received five comments suggesting the 
addition of the term ``full scale'' in order to clarify certain 
requirements for spill drills. The comments proposed that the term mean 
maximum participation by all levels of a facility's response 
organization to test major portions of the plan with a high degree of 
realism and extensive involvement. The Coast Guard extensively revised 
Sec. 154.1055 of subpart F to reflect concerns expressed by comments, 
as well as to bring the section into alignment with the vessel response 
plan final rule and the applicable EPA regulations. Section 154.1055 is 
now entitled ``Exercises'' and requires the owner or operator of a 
facility to conduct exercises that will test the entire response plan 
every 3 years. The requirements allow the owner or operator to exercise 
different elements of the plan (e.g. qualified individual notification, 
spill management team, equipment deployment) at different times. 
However, the exercises must still test every element of the plan every 
3 years and, in addition, an unannounced exercise must also be 
conducted every 3 years. The revised Sec. 154.1055 also allows owners 
or operators to fulfill the exercise requirements by complying with the 
National Preparedness for Response Exercise Program (PREP). In view of 
these changes, a definition of ``full scale'' is not necessary.
    Functional. The Coast Guard received five comments suggesting that 
the term ``functional'' be added to the definitions section in the 
final rule to clarify certain requirements for spill drills. The 
comments proposed that the term be defined as the limited exercising of 
specific functions, such as a command and control, internal 
coordination, external coordination, and tests of the functional 
planning and response capabilities of personnel and systems. In 
response to these, and other comments, the Coast Guard has extensively 
revised Sec. 154.1055 which was entitled ``Drills'' in the IFR and is 
now entitled ``Exercises.'' The Coast Guard concludes that the 
Exercises section now adequately addresses the meaning of the term 
functional. The functional areas are laid out in 
Sec. 154.1035(b)(3)(iii) of subpart F. Response plans must contain an 
organizational structure incorporating the listed functional areas. 
Section 154.1035(b)(3)(iv) requires response plans to also contain job 
descriptions for the spill management team members in each functional 
area identified in the organizational structure described in 
Sec. 154.1035(b)(3)(iii).
    Group IV oil. The Coast Guard received several comments indicating 
that the definition for Group IV oil included Group V oil. The Coast 
Guard has revised the definition of Group IV 

[[Page 7895]]
oil which is found in the definition of ``persistent oils'' to mean oil 
having a specific gravity equal to or greater than .95 and less than or 
equal to 1.0.
    Higher volume port areas. The Coast Guard received one comment 
which proposed to add Cook Inlet, Alaska to the list of higher volume 
port areas. The Coast Guard classified higher volume port areas based 
upon a study of the relative volumes of oil handled, stored or 
transported. The U.S. Army Corps of Engineers reports on ``Waterborne 
Commerce of the United States'' provided the statistics for 34 port 
areas. The decision to classify some ports as higher volume was based 
upon the Coast Guard's analysis of the data from the reports. The data 
revealed a distinct break point. Cook Inlet, Alaska falls below the 
break point and, as such, does not meet the criteria for designation as 
a higher volume port area.
    Marine transportation-related facility. The Coast Guard received 
three comments on the definition of MTR facility. One comment requested 
that the Coast Guard clarify the definition by citing specific types of 
facilities to which it refers. The Coast Guard gave examples of MTR 
facilities in the preamble to the IFR (e.g., fixed onshore MTR 
facilities include marinas; and mobile MTR facilities include tank 
trucks and railroad tank cars). Two other comments requested 
clarification of Coast Guard and RSPA jurisdiction over pipelines at 
MTR facilities. As stated in the preamble to the IFR, the definition of 
transportation-related and non-transportation-related facilities 
appeared in a 1971 Memorandum of Understanding (MOU) between the 
Environmental Protection Agency and the Department of Transportation. 
The MOU appears in the appendix to 40 CFR part 112. The Coast Guard 
definition of MTR is drawn directly from the MOU. The division point 
between the transportation-related portion of a pipeline, and the non-
transportation-related portion of a pipeline is the first design 
discontinuance (valve) inside the secondary containment surrounding the 
tanks in the non-transportation-related portion of the facility. The 
Coast Guard finds that MTR is clearly defined in accordance with the 
appropriate legal authority. In a particular situation, if the location 
of the division between the MTR portion and the non-MTR portion is 
unclear, then the appropriate Federal officials, including the Coast 
Guard COTP, should be consulted. As set forth in the definition, these 
officials may agree to a specific location for the separation.
    Maximum extent practicable. One comment asserted that the 
definition of ``maximum extent practicable'' is too rigid and does not 
allow for the flexibility that Congress intended. According to the 
comment, location, size, configuration, and other similar factors, 
should be considered in developing response plans. The Coast Guard has 
used a number of factors in determining the need to prepare and submit 
a response plan. The planning process also considers other factors as 
provided in Secs. 154.1035 and 154.1045.
    Maximum most probable discharge. The Coast Guard received four 
comments on the definition of maximum most probable discharge 
suggesting that the Coast Guard revise the maximum most probable 
discharge volume of 1,200 barrels or 10 percent of the volume of the 
worst case discharge to be consistent with the EPA maximum most 
probable discharge volume of 36,000 gallons. As stated in the preamble 
to the IFR, the Coast Guard based its maximum most probable discharge 
definition upon historical spill data which indicated that 99 percent 
of oil spills from coastal zone facilities were approximately 1,200 
barrels or less. The Coast Guard concludes that the existing definition 
is appropriate because it protects the environment while not overly 
burdening small volume facilities.
    Nearshore area. The Coast Guard received two comments on the 
definition of nearshore area. One comment stated that the definition 
should exclude areas which also meet the definition of rivers and 
canals. Another comment requested clarification of the relationship 
between nearshore areas and other terms such as ``close-to-shore'' in 
Appendix C and ``close to shore response activities in shallow water'' 
in Sec. 154.1045(e). The definition of ``Nearshore area'' does not 
presently include areas which meet the definition of rivers and canals 
because ``Rivers and canals'' is a subset of the definition of ``Inland 
areas'' not ``Nearshore areas.'' The precise meaning of ``close-to-
shore'' is specified at the point where the term is used. Close-to-
shore refers to waters six feet or less in depth.
    Notification drill. The Coast Guard received five comments that 
suggested the addition of the term ``notification drill'' to the 
definition section of the final rule. The comments suggested defining 
the term to mean a test of the facility's system of notifying or 
activating, according to the facility's response plan, appropriate 
agencies, the facility spill management team, the oil spill removal 
organization, and the next higher level of the facility owner's or 
operator's organization. A notification drill tests the facility's 
ability to start activation of its plan. To be successful, a 
notification drill need not result in calls to the top of the 
facility's response organization. The Coast Guard has extensively 
revised Sec. 154.1055 which was previously entitled ``Drills'' and is 
now entitled ``Exercises.'' The revised section includes a ``Qualified 
Individual notification exercise'' and specifies that compliance with 
the National Preparedness for Response Exercise Program (PREP) fulfills 
all exercise requirements. The Coast Guard concludes that these changes 
adequately address the points raised by the comments.
    Oil. The Coast Guard received seven comments on this definition. 
One comment requested that the Coast Guard narrow the definition of oil 
to exclude substances which contain small percentages of oil such as 
ship bilge and ballast water. One comment indicated that the definition 
of oil in the regulations should be consistent with the definition in 
OPA 90, which excludes hazardous substances subject to CERCLA. Four 
comments stated that oil should be limited only to petroleum oils which 
are liquid under the range of ambient conditions which exist at a 
facility and which are not considered CERCLA substances. OPA 90 did not 
amend the definition of oil in section 311 of the FWPCA. The Coast 
Guard's definition of ``oil'' is the same definition used by the FWPCA. 
The statutory definition refers to oil in any form. That includes oily 
bilge and ballast water because they have been shown to be sources of 
oil pollution and discharges may result in substantial harm to the 
environment. The Coast Guard has determined that it is appropriate for 
response plans to include provisions covering oils which may not be 
liquid in all conditions. Such oils may sink to the bottom or remain 
suspended in the water column. In either case, they may cause 
substantial harm to the environment if not cleaned up as soon as 
possible. The Coast Guard concludes that the current definition of oil 
meets both the letter and the spirit of the FWPCA and therefore is not 
changing the definition of oil.
    Another comment stated that the response plan regulations should 
not apply to edible oils. The comment contended that if edible oils 
were excluded from the regulations, the owner or operator of a facility 
handling edible oils still would be required to report and cleanup a 
spill under the Clean Water Act (CWA). The Coast Guard definition of 
``oil'' is the same definition that is used by the FWPCA. That 
definition includes edible oils. The 

[[Page 7896]]
Coast Guard has created new subparts in the final rule to distinguish 
non-petroleum oils, including edible oils such as animal fats and 
vegetable oils, from petroleum oils. The scientific data currently 
available to the Coast Guard strongly indicate that these oils may have 
an adverse impact upon the environment that is similar to the impact of 
petroleum oils. As a result, the Coast Guard is not exempting non-
petroleum oils from response planning in the final rule. The Coast 
Guard will continue to assess its position as further data become 
available on the subject.
    Oil spill removal organization. The Coast Guard received two 
comments on the definition of oil spill removal organization which 
suggested that the definition be revised to be more specific. The Coast 
Guard crafted the definition if oil spill removal organization to be 
flexible enough to apply to varying types of organizations which may be 
called upon to respond to a discharge of oil while complying with OPA 
90 requirements. A more specific definition, while useful to some in 
the industry, might exclude organizations which are able to provide 
useful and needed response capabilities. The Coast Guard is not 
changing the definition of oil spill removal organization and suggests 
that any questions regarding the suitability of a particular 
organization be directed to the COTP for the area in which the facility 
is located.
    Other non-petroleum oil. The Coast Guard has added a definition of 
``other non-petroleum oil.'' Other non-petroleum oil means a non-
petroleum oil of any kind that is not generally an animal fat or 
vegetable oil.
    Persistent oil. The Coast Guard received two comments on the 
definition of persistent oil. Both comments indicated that the 
definition proposed in the IFR does not account for oils that have a 
specific gravity greater than 1.0 that do not sink in salt water. The 
comments suggest that the definition be revised to include all products 
which could reasonably be expected to sink in the environment in which 
they are likely to be discharged. The definition of persistent oils is 
subdivided based upon specific gravity into Groups II, III, IV and V. 
The Coast Guard finds that further subdivision is unnecessary because 
the definition currently includes all oils with a specific gravity of 
greater than 1.0, regardless of whether or not they sink in salt water. 
Furthermore, the Coast Guard concludes that, in combination with other 
factors, even those oils referred to in the comments are very likely to 
sink in salt water.
    Private shore-based personnel. The Coast Guard received one comment 
suggesting the addition of this term to the regulation. The comment 
indicated that certain Occupational Safety and Health Administration 
(OSHA) standards are not enforced. The Coast Guard is not tasked with 
enforcement of OSHA standards except in very specific instances. In the 
context of pollution control regulations such as OPA 90, the Coast 
Guard is not responsible for enforcing OSHA standards. Therefore, it is 
unnecessary for the Coast Guard to add this term to the final rule.
    Rivers and canals. The Coast Guard received 8 comments on this 
definition. All eight comments questioned the use of the 12 foot 
project depth as a criterion for determining whether a waterway is a 
river or canal. One comment suggested that a project depth of 18 feet 
be applied as the standard. Four comments suggested that the COTP 
should be given the discretion to determine which waterways will be 
determined to be rivers or canals. The 4 comments also stated that the 
terms rivers and canals should be applied only to certain areas with 
definite geographical demarcations. Two comments requested 
clarification on whether the 12-foot project depth criterion applies 
only to artificially created waterways. Additionally, these 2 comments 
indicated that the definition of rivers and canals excludes certain 
rivers. The definition of rivers and canals applies to all waterways 
with a project depth of 12 feet or less including both naturally and 
artificially occurring ones. The Coast Guard finds that the 12-foot 
depth is appropriate to define the inland areas where shallow draft 
vessels may call at MTR facilities and has not changed it in the final 
rule. The COTP has the authority to redefine specific operating 
environments within his or her jurisdiction. This provisions is 
continued in the final rule.
    Specific gravity. Several comments encouraged the Coast Guard to 
define specific gravity in the final rule. The Coast Guard agrees and 
has used the definition of specific gravity found in ASTM Standard D 
1298 entitled ``Standard Practice for Density, Relative Density 
(Specific Gravity), or API Gravity of Crude Petroleum and Liquid 
Petroleum Projects by Hydrometer Method.''
    Spill management team. The Coast Guard received 5 comments on this 
definition. Four comments stated that the definition of spill 
management team should reflect the allowance for tiered spill 
management teams. Another comment indicated that the FRP regulation 
should be consistent with the VRP regulation which permits the spill 
management team function to be fulfilled by an organization outside the 
planning area of the spill. A ``tiered'' spill management team is not 
prohibited by the regulations as they appeared in the IFR and remain in 
the final rule. The definition is identical in both the VRP and FRP 
final rules to ensure consistency in spill management team 
requirements.
    The Coast Guard received 5 comments suggesting that it define the 
term ``corporate spill management team.'' One comment suggested that 
this term be defined to mean a national team of operational and 
functional experts and consultants responsible for moving quickly to a 
spill site to replace or support a facility response team in managing a 
response. The Coast Guard also received 5 comments requesting that it 
add the term ``facility spill management team'' to the regulation. The 
comments suggested that the term be defined to mean a team responsible 
for initiating and managing a response to a spill to its conclusion or 
until a team member from a higher tier in the overall response 
organization is activated and on-scene to support the facility team or 
manage the response until its conclusion.
    The Coast Guard concludes that the existing definition of ``spill 
management team'' already incorporates the elements that the comments 
suggest. The Coast Guard therefore finds that it is both unnecessary 
and undesirable to complicate the regulation by subdividing the 
definition of spill management team. Section 154.1035(b) contains 
detailed requirements regarding plan content including the spill 
management team. The spill management team may include all persons 
relevant to an effective spill response except Federal, State and local 
authorities. It may include local, as well as regional or national 
corporate officials, operational, as well as functional experts, and 
representatives of OSROs. The local or on-site spill response team 
members can, and should, be prepared to integrate other persons, such 
as regional and national corporate officials, into their spill response 
team structure.
    Table top. The Coast Guard received 5 comments requesting that it 
add the term ``table top'' to the final rule to clarify certain spill 
drill requirements. The comments suggested that the term be defined as 
a verbal walk-through to discuss action to be taken during simulated 
emergency situations, designed to elicit constructive discussion by the 
participants without time constraints. A table top drill does 

[[Page 7897]]
not involve the movement of equipment or people. The Coast Guard has 
extensively revised Sec. 154.1055 which was previously entitled 
``Drills'' and is now entitled ``Exercises.'' The revised section 
specifies that compliance with the National Preparedness for Response 
Exercise Program (PREP) fulfills all exercise requirements. The Coast 
Guard concludes that the changes adequately address the points raised 
by the comments.
    Tier. The Coast Guard received one comment which stated that the 
use of ``tier'' in the IFR was unclear, and suggested that the Coast 
Guard define the term in the final rule. The Coast Guard agrees and has 
defined ``tier'' in the final rule.
    The requirements for response to a worst case discharge to the 
maximum extent practicable are based on the tiering of response 
resources. The concept of ``tier'' has two primary components: The 
amount of equipment and personnel required for a response to a worst 
case discharge, and the amount of time in which these response 
resources are required to be on-scene from the time of discovery of an 
oil discharge. Tiering allows for the arrival of response resources at 
various stages of the response effort. Tiering the mobilization of 
response resources recognizes the need for a rapid initial response to 
an oil spill, yet allows for the identification of response resources 
from outside the area of the facility to meet the response resource 
planning requirements.
    Sections 154.1045(e) and 154.1047(a)(1) of subpart F of the final 
rule require a facility owner or operator to identify, by contract or 
other approved means, equipment and personnel to respond to the 
facility's worst case discharge for Group I-IV oils and Group V oils, 
respectively. Appendix C and especially Tables 2, 3, and 4 provide 
specific guidance on calculating the amount of response equipment 
required by these sections. Table 4 provides mobilization factors used 
to calculate the amount of response resources required for on-water 
recovery for each tier. Table 5 establishes caps to the amount of 
response resources for which a facility owner or operator must contract 
in advance. Caps have been established for response resources required 
for Tiers 1, 2, and 3. The caps recognize the current limits on 
technology and private removal capabilities. The caps are for planning 
purposes only; in no way do the caps limit the amount of resources 
which a facility owner or operator may be required to mobilize during 
an actual spill response.
    Section 154.1045(f) of subpart F establishes three time tiers for 
the on-scene arrival of response resources for the different operating 
environments for Group I-IV oils.

Section 154.1025  Operating Restrictions and Interim Operating 
Authorization

    The Coast Guard received 10 comments on this section of the 
regulation. One comment requested that the Coast Guard clarify the 
requirement for facilities to submit response plans meeting the 
requirements of Sec. 154.1030 for review and approval to the Coast 
Guard COTP and the requirement to operate in full compliance with the 
approved plans.
    Section 154.1017 requires all facilities which could reasonably be 
expected to cause at least substantial harm to the environment to 
prepare and submit response plans to the Coast Guard. Only facilities 
which could reasonably be expected to cause significant and substantial 
harm to the environment are required to submit response plans for 
review and approval by the Coast Guard. Section 154.1025(b) requires 
all facilities that are required to prepare response plans to operate 
in compliance with their plans.
    The Coast Guard has added to the final rule a provision that 
requires facility owners or operators making initial response plan 
submissions after May 29, 1996, to comply with the requirements of the 
final rule. The Coast Guard is not requiring facility owners or 
operators who submitted response plans under the IFR or NVIC to revise 
their response plans to conform with the requirements of the final rule 
until the plan's 5-year resubmission date. However, a facility owner or 
operator who has prepared a response plan under the NVIC or the IFR may 
comply with any of the provisions of this final rule by revising the 
appropriate section of the previously submitted plan in accordance with 
the revision and amendment procedures in Sec. 154.1065. An owner or 
operator who elects to comply with all of the requirements of the final 
rule must resubmit the entire plan for review and approval, if 
appropriate, in accordance with Sec. 154.1060.
    One comment suggested that Sec. 154.1025(d) be revised to give the 
Coast Guard authority to prohibit a facility from operating if the COTP 
determines that a previously approved plan has not been properly 
revised or updated. The Coast Guard finds that Sec. 154.1065 provides 
the COTP with adequate authority to enforce the requirements for 
response plan amendments and revisions. Under Sec. 154.1065(c), the 
COTP may require a facility owner or operator to revise a response plan 
at any time if the COTP determines that the plan does not meet the 
requirements of this regulation.
    Section 154.1025(d) provides four specific circumstances under 
which a facility may not handle, store, or transport oil including a 
COTP determination that owner-certified response resources or a 
submitted response plan do not meet the requirements of the subpart.
    One comment indicated that the Coast Guard should limit its review 
and approval of response plans to 30 days for those plans submitted by 
February 18, 1993, the deadline for plan submission under the IFR. 
Limited resources prevented the Coast Guard from guaranteeing a review 
of every submitted response plan within 30 days. However, to facilitate 
the operations of facilities requiring Coast Guard review and approval 
under Sec. 154.1025(c), the Coast Guard permitted these facilities to 
continue operations for up to 2 years from the date of plan submission. 
This procedure is in accordance with Sec. 311(j)(5)(F) of the FWPCA.
    The same comment suggested that a facility owner or operator should 
have no more than 30 days to make corrections to a plan if the plan is 
not approved by the COTP. Because of the varying degrees of plan 
deficiencies, the Coast Guard has determined that the COTP must have 
the flexibility to specify the period in which the facility owner or 
operator could reasonably be expected to correct the deficiencies.
    One comment stated that, to be consistent with EPA and RSPA 
regulations, the Coast Guard should not formally review the letter from 
a facility owner or operator certifying the availability of response 
resources. Conversely, another comment indicated that a facility owner 
or operator should be required to certify in writing not only that he 
or she has ensured the availability of the necessary response 
resources, but also that the response resources are capable of being 
on-scene within the specified response times. The Coast Guard has 
determined that, until it is able to complete the review of the 
submitted response plans, its review and acceptance of the 
certification letters is its primary means of ensuring that facilities 
are in compliance with the statutory provisions of OPA 90 requiring the 
identification of response resources. The Coast Guard requires facility 
owners or operators to indicate in the certification letter that the 
response resources identified are in compliance with subpart F, G, or H 
as appropriate. 

[[Page 7898]]
Section 154.1028(a) requires response resources to be capable of being 
on-scene within specified times.
    One comment indicated that response contractors probably would not 
have all of the spill response equipment in stock that is necessary to 
meet the August 18, 1993 deadline in the IFR, particularly the 
equipment used for recovering oil in shallow waters. The comment 
requested that the Coast Guard exempt this type of equipment from the 
response plan requirements. The Coast Guard found that at the time of 
the comment there was no evidence to indicate that facility owners or 
operators were unable to identify adequate response resources for 
recovering oil in shallow water.
    Another comment suggested that the Coast Guard clarify the language 
in Sec. 154.1025(c) permitting interim operating requirements prior to 
Coast Guard approval of a response plan. The Coast Guard has updated 
and clarified Sec. 154.1025(c). Additionally, the comment indicated 
that this paragraph should apply also to substantial harm facilities. 
Section 154.1025(c) applies only to the owners or operators of 
facilities for which the Coast Guard must review and approve response 
plans. Under section 311(j) of the FWPCA and 33 CFR 154.1017(b), only 
significant and substantial harm facilities are required to submit 
response plans for Coast Guard review and approval.

Section 154.1026  Qualified Individual and Alternate Qualified 
Individual

    The Coast Guard received 9 comments on this section of the IFR. 
Four of the comments contended that the Coast Guard should permit the 
qualified individual to be identified in the plan by his or her title, 
rather than his or her name. Two comments suggested that the Coast 
Guard establish a mechanism by which the qualified individual can be 
chosen from a group of individuals among whom the responsibility of the 
qualified individual rotates. Another comment stated that the facility 
owner or operator should not be required to provide documentation to 
the qualified individual in order to activate his or her authority as 
the qualified individual. The Coast Guard finds that the amount of 
authority vested in the qualified individual warrants that the response 
plan identify the specific individual(s) assuming this position. For 
this reason, the Coast Guard also requires the qualified individual to 
have documentation which clearly indicates his or her role in the 
facility's response activities.
    Five comments requested clarification on the responder immunity 
provisions in Sec. 154.1026 (e) and (f). Three of the comments 
specifically requested that the Coast Guard clarify who is immune from 
liability under the provisions. Two comments suggested that the Coast 
Guard address the immunity of the qualified individual in the 
regulatory text. One comment suggested that the potential liability for 
the qualified individual is too significant to attract many capable and 
qualified persons for the position.
    As discussed in the preamble to the IFR, section 311(c)(4) of the 
FWPCA provides that only a responsible party is liable for the removal 
costs or damages which result from actions taken or omitted in the 
course of rendering care, assistance, or advice consistent with the 
National Response Plan or as otherwise directed by the President. A 
person does not become a responsible party under section 311(c) of the 
FWPCA by being designated as a qualified individual for response plan 
purposes. However, a person whose acts or omissions are grossly 
negligent, or who engages in willful misconduct may, as a result, 
become liable for the resulting damages. The Coast Guard does not have 
the authority to grant immunity to the qualified individual and, 
therefore, cannot establish immunity provisions in the final rule. 
However, the Coast Guard does recognize that the qualified individual 
is not responsible for the adequacy of response plans, nor is he or she 
responsible for contracting response resources beyond the authority 
delegated from the facility owner or operator. These points are 
reflected in the regulatory text.
    Seven comments addressed the facility owner's or operator's ability 
to substitute a person from a higher level of management for the 
designated qualified individual. Four comments requested that the Coast 
Guard state this option in the regulatory text. Additionally, three 
comments questioned whether the person from a higher level of 
management who is assuming the responsibilities of the qualified 
individual is considered to be the qualified individual during an 
actual spill response. The Coast Guard does not intend to limit the 
discretion of the facility owner or operator to select any qualified 
person to assume the full range of responsibilities of the qualified 
individual. A facility owner or operator may, at any time, substitute 
the designated qualified individual or alternate qualified individual 
with a person from a higher organizational level who meets the 
requirements of Sec. 154.1026. In order for that person to be 
recognized as the qualified individual, the facility owner or operator 
must provide the individual with a document designating them as the 
qualified individual as required by Sec. 154.1026(c). The Coast Guard 
has changed the language in Sec. 154.1026 to clarify that the Qualified 
Individual or an Alternate Qualified Individual must be available on a 
24-hour basis and must be able to arrive at the facility within a 
reasonable time.
    One comment requested a more stringent English language requirement 
for the qualified individual and suggested that the qualified 
individual be required not only to speak fluent English, but also be 
required to read, comprehend, and write in English at a level of high 
school equivalency. Although the regulation states only that the 
qualified individual must speak fluent English, the Coast Guard 
concludes that this requirement will restrict the designation of the 
qualified individuals to persons who can communicate effectively with 
the On-Scene Coordinator during a response effort.
    One comment objected to the requirement that both the qualified 
individual and the alternate qualified individual be available on a 24-
hour basis. The preamble to the IFR stated that the Coast Guard's 
intent is to ensure that either the qualified individual or the 
alternate qualified individual be available to respond to an oil spill 
on a 24-hour basis. In response to this comment, the Coast Guard has 
reworded Sec. 154.1026(a) to make it clear that either the qualified 
individual or the alternate, but not both, must be available on a 24-
hour basis. This conforms with both the intent stated in the IFR 
preamble and the related section of the VRP rule.
    One comment stressed that the qualified individual should be 
knowledgeable about not only the financial aspect of an oil spill 
response, but also the technical issues pertaining to an oil spill 
response. The Coast Guard agrees that familiarity with response methods 
is an asset to a Qualified Individual and encourages facility owners or 
operators to designate such persons as qualified individuals; however 
the ability to commit response resources is the primary requirement.
    Under the regulations, the facility owner or operator is required 
to identify a qualified individual who is capable of arriving at the 
facility in a reasonable time. To ensure this, the Coast Guard has 
amended this section to require the qualified individual to be located 
in the United States. This issue was previously discussed in the 
preamble to the IFR.

[[Page 7899]]

Section 154.1028  Methods for Ensuring the Availability of Response 
Resources by Contract or Other Approved Means

    The Coast Guard received 11 comments on this section of the IFR. 
Four comments suggested that Sec. 154.1028(a)(1), the first means of 
identifying response resources by contract or other approved means, be 
revised to indicate that an oil spill removal organization is unable to 
guarantee the availability of identified response resources to respond 
to a spill at a facility. The regulations require the owner or operator 
of a facility to ``ensure'' the availability of response resources 
because this is the terminology used in the statute. The Coast Guard 
has emphasized that response plans are planning documents, not 
performance criteria, and that neither the owner or operator nor the 
spill removal organization can guarantee the availability of resources 
at all times. Acts of God, extremes of weather, labor disputes, the 
prior commitment of resources, and other events may preclude 
performance as planned. The Coast Guard also expects certain caveats to 
be placed in a contract indicating that the response resources 
identified are not guaranteed to perform response activities at a 
facility. The Coast Guard expects that the contract will provide for 
prompt notification of impaired ability to perform and that, when 
appropriate, facility owners and operators will seek alternate response 
resources. Notification of changes in response resources may be 
required under Sec. 154.1065(b)(3).
    Another comment stated the Coast Guard should require a facility 
owner or operator who ensures the availability of response resources by 
certifying his or her active membership in an oil spill removal 
organization under Sec. 154.1028(a)(3) also to certify that the oil 
spill removal organization has committed to respond to an oil spill 
from the facility. The Coast Guard finds that a facility's active 
membership in a spill removal organization that has identified 
specified personnel and equipment required by the regulation to arrive 
at the specified times is adequate assurance that the spill removal 
organization will respond to an oil spill at the facility.
    Four comments questioned whether an oil spill removal organization 
that has identified specific response resources to respond to an oil 
spill at one facility can list the same resources to respond to a spill 
at another facility. The Coast Guard recognizes that there are current 
limits on the amount of available response resources in the U.S.
    Facilities would be unable to operate due to their inability to 
identify available response resources which were not contracted for by 
other facilities. In addition, prohibiting oil spill removal 
organizations from contracting response resources for more than one 
facility is economically prohibitive for oil spill removal 
organizations.
    One comment suggested that the Coast Guard remove the fourth method 
of ensuring by contract or other approved means in Sec. 154.1028(a)(4). 
Section 154.1028(a)(4) permits the facility owner or operator to ensure 
the availability of response resources by providing a document that: 
(1) Identifies response resources to be provided by an oil spill 
removal organization in the stipulated response times in specific 
geographic areas; (2) sets out the parties' acknowledgment that the oil 
spill removal organization intends to commit the resources in the case 
of a spill; (3) permits the Coast Guard to verify the availability of 
the response resources through tests, inspections, and drills; and (4) 
is referenced in the response plan. The comment indicated that this 
provision is not necessary. The Coast Guard disagrees. Section 
154.1028(a)(4) provides the owner or operator of a facility with an 
alternate means of identifying and ensuring the availability of 
response resources. This flexibility may prove to be economically 
essential for certain facilities.
    Four comments stated that an oil spill removal organization should 
not be required to list the names of the response personnel who are 
identified to be available to respond to an oil spill. The comments 
contend that OSROs are responsible for maintaining sufficient numbers 
of trained personnel to respond to any potential spills to which it has 
committed to respond. The Coast Guard agrees. An OSRO is not required 
to list the names of persons who are identified to be available to 
respond to an oil spill; however, an oil spill removal organization 
must specify the response personnel available to respond to an oil 
spill.
    One comment indicated that a signed service agreement should be 
sufficient to meet the requirements of Sec. 154.1028(a)(5). As long as 
the ``signed service agreement'' meets the requirements of 
Sec. 154.1028 it is acceptable to the Coast Guard. Such an agreement, 
to be valid under Sec. 154.1028(a)(5), would need to identify specified 
equipment and personnel available within the applicable stipulated 
response times; and, the OSRO would need to consent to being identified 
in the plan.
    Another comment stated that the Coast Guard should require a 
facility owner or operator to ensure that identified response resources 
not only are available to arrive at stipulated times, but also are 
capable of sustaining a response effort. The comment indicated that the 
Coast Guard should analyze the adequacy of response resources on a 
systems basis to ensure that all identified resources are capable of 
functioning together. The Coast Guard finds that the response resource 
requirements are sufficient as set forth in this final rule. The 
requirements are for planning purposes only and are not intended to be 
performance standards. Where the Coast Guard has determined that it is 
both appropriate and necessary it has included times for sustained 
response effort (see Appendix C).
    One comment indicated that a facility that operates only on a 
seasonal basis should not be required to ensure the availab
FR Doc. 96-4274 Response Plans for Marine Transportation-Related Facilities
ility of 
response resources when it is not operating. Under the provisions of 
Sec. 154.100(a), a facility which is in caretaker status is exempt from 
the requirements of this regulation and, therefore, is not required to 
ensure the availability of response resources when it is in caretaker 
status.
    One comment suggested that the Coast Guard provide a mechanism for 
contractors to exercise some control over where they are named as 
response resources. This comment expanded upon its suggestion by 
stating that the Coast Guard should require some documentation which 
validates the relationship between the contractor and the owner or 
operator. Section 154.1028 provides for five methods of ensuring the 
availability of response resources, including OSROs, by contract or 
other approved means. At a minimum, the OSRO must provide written 
consent to being identified in a response plan. Under some conditions, 
a written contractual agreement must be executed between the OSRO and 
the owner or operator of the facility. These contracts must be made 
available for review upon request by the Coast Guard. The Coast Guard 
contends that this provides adequate documentation that the proper 
relationship exists between the OSRO and the owner or operator of the 
facility.
    One comment argued that contracts should be required as an 
outgrowth of comprehensive risk analyses at each potential spill site 
rather than the result of an intuitive need to have resources 
available. The Coast Guard disagrees. OPA 90 requires the preparation 
and submission of a response plan for an onshore facility that, because 
of its 

[[Page 7900]]
location, could reasonably be expected to cause substantial harm to the 
environment by discharging into or on the navigable waters or adjoining 
shorelines. The OPA 90 Conference Report (Report 101-653) states that 
even small onshore facilities could result in substantial harm under 
some circumstances. Therefore, the requirements to prepare and submit a 
response plan should be broadly applied. Along with other Federal 
agencies, the Coast Guard has established criteria to be considered in 
designating a facility as substantial harm. These factors include, but 
are not limited to: type and quantity of oils handled in bulk, facility 
spill history, proximity to public and commercial water supply intakes; 
proximity to navigable water and proximity to areas of economic 
importance.

Section 154.1029  Worst Case Discharge

    The Coast Guard received a total of 16 comments on this section of 
the IFR. Ten comments addressed the relationship between the Coast 
Guard's definition of worst case discharge and the term as it is 
defined by other Federal agencies. Four comments indicated that the 
Coast Guard's definition of worst case discharge should be the same as 
the definition found in EPA's response plan regulations. Five comments 
indicated the need for consistency among Coast Guard, EPA, and RSPA 
definitions of worst case discharge, and suggested that the Coast Guard 
adopt RSPA's definition. The Coast Guard disagrees with these comments. 
Because the Coast Guard, EPA, and RSPA regulate different portions of 
an oil complex, the amount of oil in a worst case discharge volume from 
each of these portions of the complex will vary depending on the nature 
of the facility's operations. Coast Guard regulations address only the 
MTR portion of the complex.
    Three comments indicated that the Coast Guard should adopt the EPA 
and RSPA policy of giving credit to the facility for the use of 
secondary containment and other preventive measures. Seven comments 
reiterated the point that Coast Guard regulations should encourage the 
use of preventive measures. The Coast Guard strongly encourages 
facilities to employ pollution prevention measures including secondary 
containment. However, the nature of MTR facilities makes secondary 
containment impractical in most cases and therefore very uncommon. For 
this reason, the Coast Guard does not require MTR facilities to have 
secondary containment. The Coast Guard does not give credit for such 
measures because, while these measures will reduce the risk to the 
environment from an oil spill, they will not eliminate it altogether. 
Subparts A and B of 33 CFR part 154 already contain pollution 
prevention regulations. The Coast Guard considers additional pollution 
prevention regulations to be outside the scope of this regulation.
    The Coast Guard received several comments on the amount of the 
worst case discharge volume. All comments indicated that the worst case 
discharge volume, as calculated using the formula in 
Sec. 154.1029(a)(2), should be reduced. Many of the comments stated 
that the Coast Guard's definition of worst case discharge should not 
include a total loss of a facility's oil storage capacity and suggested 
that it be based on factors such as spill history, the capacity of the 
largest single pipeline, or the capacity of pipelines to the single 
largest docking pier. Additionally, four comments indicated that the 
definition exceeded the congressional intent of this term--the largest 
foreseeable discharge from a facility. The Coast Guard disagrees. 
Section 4201(b) of OPA 90 defines a worst case discharge as the largest 
foreseeable discharge (from a facility) in adverse weather conditions. 
The Coast Guard has interpreted this to mean the largest probable 
discharge that could occur from a facility and has determined that the 
worst case discharge includes the volumes of oil from all pipelines 
between the dock and the storage tanks. Additionally, the formula for 
calculating the worst case discharge in Sec. 154.1029(a)(2) accounts 
for the time to detect a spill from the piping and the time to secure 
the operation.
    One comment contended that the Coast Guard should not deny the 
validity of a response time calculation without substantial evidence 
that it cannot be accomplished in the time stated. The Coast Guard 
disagrees. Section 154.1045 and appendix C of the final rule provide 
requirements on which to base on-water and on-land response times. A 
facility owner or operator proposing to use more rapid response times 
bears the burden of proving the validity of the alternate calculation.
    One comment suggested that both human and mechanical systems should 
be considered for detecting spills during transfer operations. The 
comment notes that, in the preamble to the IFR for this section, the 
Coast Guard referred only to ``fail-safe features designed into the 
operation such as leak detection and mechanical methods of isolating 
segments of the pipeline.''
    The Coast Guard is concerned that undue reliance on fail-safe 
features may lead to an underestimation of necessary response resources 
in the event of a discharge from the facility. The Coast Guard 
concludes that it is reasonable to base the worst case discharge 
planning volume on the failure of such fail-safe features since it has 
been the Coast Guard's experience that these features do not always 
work as expected.
    One comment argued that worst case discharge calculation methods 
should be maintained separate from the facility response plan to keep 
the document from becoming too bulky. The Coast Guard agrees. It is not 
required that the response plan contain the method or numbers used in 
calculating the worst case discharge. Only the volume of the average 
most probable, maximum most probable, and worst case discharges need be 
provided. However, providing the numbers used to arrive at the worst 
case discharge will facilitate review of the response plan.

Section 154.1030  General Response Plan Contents

    The Coast Guard received 10 comments on the requirements for 
general response plan contents. Two comments expressed approval of the 
plan format requirements established in the IFR and indicated that 
other Federal agencies should adopt these requirements. Another 
comment, however, expressed that the order of the sections required in 
the plan is inappropriate and should be changed. The Coast Guard has 
reviewed the response plan formatting requirements and has determined 
that the current response plan format facilitates easy use of the 
response plan; therefore, the Coast Guard has made no changes to the 
formatting requirements in the final rule. Section 154.1030(e), 
however, does permit a facility owner or operator to submit a response 
plan that does not follow the format specified in the regulation as 
long as the plan is supplemented with a detailed cross-reference 
section identifying the location of the applicable sections required by 
the regulation.
    One comment stated that a facility owner or operator should be 
permitted to reference previously established procedures in the plan's 
appendices rather than restating them in the plan. The Coast Guard 
disagrees. The Coast Guard intends for the response plan to serve as 
the primary document referenced by facility personnel during a spill 
response. In the event of an oil discharge, facility personnel should 
be required to refer to only one comprehensive manual for instruction 

[[Page 7901]]
on spill response activities and procedures. The regulation, however, 
does not preclude a facility owner or operator from referencing 
previously established material in the plan as long as the information 
required by the regulation is contained in the appropriate section on 
the response plan.
    Many comments addressed the requirements for response plan 
contents. One comment suggested that response plans be expanded to 
include measures for prevention, control, containment, and restoration 
as well as methods for cleanup and disposal. The regulation currently 
addresses these issues, with the exception of prevention and 
restoration methods. Section 4202 of OPA 90, the authorizing provision 
for response plan requirements, grants the Coast Guard authority to 
issue regulations addressing only spill response activities. It does 
not address spill prevention or restoration and, therefore, these 
issues are not addressed by this regulation.
    Four comments suggested that the plans address company or site-
specific information. Section 154.1035(g) requires facility specific 
information to be included as an appendix to the plan. A facility owner 
or operator may also include company specific information as a separate 
appendix to the plan.
    One comment suggested that the Coast Guard reduce the amount of 
information required in the plan and indicated that the Coast Guard 
should require only vital emergency response information in the plan to 
streamline the initial notification process. The regulations establish 
minimum content requirements for response plans and require information 
that the Coast Guard has determined to be essential for the plan to be 
of significant use by facility personnel. The Coast Guard, however, 
encourages facility owners or operators to develop response plans which 
incorporate flowcharts and checklists to facilitate the use of the plan 
in an emergency.
    Several comments addressed the requirement for response plans to be 
consistent with the NCP and the ACPs, particularly as it applies to the 
identification of sensitive areas under Sec. 154.1035(b)(4). Some 
comments pointed out the difficulties of developing response plans that 
are consistent with the ACPs when many of the ACPs are not yet 
published. In the preamble to the IFR, the Coast Guard recognized that 
many of the ACPs were not complete when the IFR was published. The 
Coast Guard indicated that, in these cases, the facility owner or 
operator would be required to identify the fish and wildlife and 
sensitive environments described in the applicable local contingency 
plans. Additionally, Appendix D of part 154 was developed to assist 
facility owners or operators in identifying fish and wildlife and 
sensitive environments which could be impacted by a worst case 
discharge from the facility. Because the coastal ACPs are now complete, 
in this final rule the Coast Guard has replaced appendix D of part 154 
which provided guidance in identifying fish and wildlife and sensitive 
environments with a new appendix D which covers training. On March 29, 
1994, the National Oceanic and Atmospheric Administration (NOAA) of the 
Department of Commerce published a notice establishing guidelines for 
the identification of fish and wildlife and sensitive environments to 
further assist facility owners or operators in identifying areas 
requiring additional protection from discharged oil (59 FR 14714). This 
interim guidance was to be used by a facility owner or operator until 
the applicable ACPs were completed.
    Since the publication of the NOAA guidance, all of the ACPs have 
been completed. Facility owners or operators must ensure that their 
response plans are in accordance with the ACP in effect 6 months prior 
to initial plan submission or the annual plan review required under 
Sec. 154.1065(a). The facility owner or operator who submits plan is 
not required to, but may, at the owner or operator's option, conform to 
an ACP which is less than 6 months old at the time of plan submission.
    One comment expressed that the ACPs should be open for public 
comment because of their impact on the response plans. Any member of 
the public may attend meetings held on the development of the ACP.
    One comment urged the Coast Guard to provide guidance as to how an 
owner or operator could cover more than one facility in a response 
plan. Facility response plans must be developed for a specific facility 
and it is not practical for a plan to cover more than one facility. 
Portions of a corporate response plan may be appropriate for inclusion 
in several facility response plans.
    Two comments urged that the facility response plan be part of a 
more comprehensive plan and not necessarily a stand-alone document. The 
Coast Guard disagrees. The facility response plan must be 
comprehensive. While it may reference other documents, it must 
demonstrate adequate response planning and outline facility response to 
a discharge from the facility.

Section 154.1035  Specific Requirements for Facilities That Could 
Reasonably be Expected to Cause Significant and Substantial Harm to the 
Environment

    The Coast Guard received 19 comments on the response plan 
requirements for significant and substantial harm facilities. The 
following discussion is divided to address the specific sections of the 
response plan on which comments were received.
    General. The Coast Guard received 2 comments addressing 
Sec. 154.1035(a), the response plan requirements for significant and 
substantial harm facilities, in general. One comment stated that the 
regulations require too much detail to be continued in the response 
plans. Another comment suggested that the response plans be required to 
address planning and prevention programs for spills that occur most 
frequently. The Coast Guard disagrees. As explained in the discussions 
on the requirements of Sec. 154.1030, the regulations require 
information that the Coast Guard has determined to be essential for a 
response plan to be of significant use to facility personnel for all 
reasonably foreseeable discharges. The plans address only spill 
response activities; they do not address spill prevention. Although the 
Coast Guard encourages facility owners or operators to establish spill 
prevention measures, they are beyond the scope of this regulation. The 
Coast Guard has issued pollution prevention regulations in 33 CFR part 
154.
    Notification procedures. Six comments addressed 
Sec. 154.1035(b)(1), requirements for notification procedures in the 
response plan. One comment suggested that the Coast Guard require the 
facility owner or operator to report to the initial notification if 
there was an early arrival of response equipment and whether response 
equipment was on-site during the transfer. The comment indicated that 
this would assist the Coast Guard On-Scene Coordinator (OSC) in 
assessing the need for additional response resources and in determining 
an appropriate response strategy for the spill.
    Under this section, the facility owner or operator is required to 
develop a notification sheet, which contains the information identified 
in Figure 1, to be transmitted to Federal, State, or local agencies in 
the initial and follow-up notifications of an oil discharges. The Coast 
Guard limited the required information to the minimum necessary. The 
facility owner or operator is not 

[[Page 7902]]
required to use the same format as Figure 1, but must develop a 
notification sheet that includes space for the information contained in 
Figure 1. The notification sheet may include any additional information 
that the facility owner or operator determines could be helpful to 
responding agencies. For this reason, the Coast Guard will not require 
additional information to be included on the notification sheet. The 
Coast Guard, however, urges the facility owner or operator to provide 
agency officials with any information that will assist them in 
developing appropriate spill response strategies.
    Five comments question whether the facility owner or operator is 
required to notify each individual in the spill management team and oil 
spill removal organization. This is not required. However, the facility 
owner or operator must notify someone in the management team and a 
representative of the oil spill removal organization. The Coast Guard 
encourage facility owners or operators to coordinate with the spill 
management team and oil spill removal organization to designate a 
primary, and an alternate, point-of-contact for notifications in each 
organization.
    Facility spill mitigation procedures. The Coast Guard received two 
comments on Sec. 154.1035(b)(2), facility spill mitigation procedures 
which addressed spill prevention measures, secondary containment, and 
requirements for complexes. These issues have been addressed in 
discussions on Secs. 154.1030, 154.1029, and 154.1017 respectively.
    Facility response activities. The Coast Guard received two comments 
on Sec. 154.1035(b)(3) which suggested that the Coast Guard require an 
OSRO to provide trained personnel necessary to continue operation not 
only for the first 7 days of the response, but for the total time 
needed to complete the spill response or until the OSRO is released 
from its response obligations by the COTP. The comments indicated that 
7 days is too short to complete response activities for a large oil 
spill. The Coast Guard agrees that 7 days is not long enough to 
complete a response to a large spill; however, the requirements of this 
section are for planning purposes only. The facility owner or operator 
is required only to identify resources for the first 7 days of the 
spill response; however, he or she is required to ensure that adequate 
response resources are available until all spill response activities 
are concluded and the resources are dismissed by the OSC.
    One of the comments also suggested that the Coast Guard require the 
use of the National Interagency Incident Management System (NIIMS) 
Incident Command System (ICS) to standardize incident command in the 
United States. Facility owners or operators should refer to the ACPs 
for guidance on the use of NIIMS ICS.
    The Coast Guard has revised Sec. 154.1035(b)(3)(iii) and (iv) of 
the final rule to be consistent with the language found in comparable 
sections of the VRP regulation. These revisions do not change the 
substantive requirements of this section.
    Sensitive environments. The Coast Guard received 14 comments 
addressing Sec. 154.1035(b)(4), requirements to protect sensitive 
environments.
    Two comments stated that the definition of sensitive environments 
should be the same in both the Coast Guard and EPA response plan 
regulations. As previously stated in the discussion on Sec. 154.1020, 
the Coast Guard has added the term ``fish and wildlife and sensitive 
environments'' to the definitions in the final rule. This term also has 
been adopted by EPA. Accordingly, this subsection has been renamed 
``Fish and Wildlife and Sensitive Environments'' in the final rule.
    Several comments addressed the identification of fish and wildlife 
and sensitive environments, particularly the requirement that these 
areas be consistent with those identified in the ACPs. These comments 
have been addressed in the preamble discussion on Sec. 154.1030.
    Many comments indicated that the requirement in the IFR to identify 
areas of economic importance results in the identification of certain 
areas that have no significant environmental sensitivity. As an 
example, one comment indicated that certain areas such as 
transportation routes are economically important, but not 
environmentally sensitive. As this comment illustrates, this 
requirement is not intended to result in the identification of every 
area of economic importance. It is, however, intended to protect those 
areas that are not otherwise identified as environmentally sensitive, 
such as recreational beaches, parks, and aquaculture sites, industrial 
water intakes and other areas important to the economic well-being of 
the surrounding community. These areas of economic importance will be 
identified by the ACPs.
    One comment suggested that the Coast Guard include water intakes 
within fish and wildlife and sensitive environments. The Coast Guard 
defers to the ACPs for such identifications.
    Two comments indicated that this section of the regulation does not 
provide enough guidance on determining the adequacy of the planning 
distances and the response equipment identified for the protection of 
fish and wildlife and sensitive environments. The comments recognized 
the utility of spill trajectory models, but indicated that they all are 
not equally reliable. Under the regulation, facility owners or 
operators are not limited to using spill trajectory models to determine 
the location of fish and wildlife and sensitive environments that may 
be affected by a discharge of oil from their facility.
    Section 154.1035(b)(4)(iii)(B)(1) of the final rule provides 
facility owners or operators with a basic formula for calculating the 
distances that discharged oil will flow from the facility under certain 
conditions at specified times. The Coast Guard recognizes that this 
formula may not take into account certain geographic and weather-
related conditions that normally exist in some ports which may affect 
the distances that discharged oil may travel from the facility; 
therefore, the COTP will determine whether the appropriate factors have 
been accounted for in the identification of fish and wildlife and 
sensitive environments. The adequacy of the identified resources also 
will be assessed by the COTP.
    The final rule also provides facility owners or operators with a 
third means of complying with the requirements of this section. In 
addition to using the formula in Sec. 154.1035(b)(4)(iii)(B)(1) or 
developing a spill trajectory model, facility owners or operators are 
permitted to use the formula in appendix C of Attachment C-III of EPA's 
FRP final rule that is most appropriate for the facility (59 FR 34070; 
July 1, 1994).
    Three comments addressed the planning distances required under the 
IFR. Two comments suggested that the Coast Guard expand the provision 
in Sec. 154.1035(b)(4)(iii)(B)(1) of the IFR, which requires the 
identification of response resources for areas that will be impacted in 
48 hours in non-tidal waters, to non-persistent oils. Because of the 
rapid rate at which non-persistent oils evaporate, the Coast Guard is 
only requiring facility owners or operators to plan to respond to areas 
reached by non-persistent oil in 24 hours in non-tidal waters at 
maximum current.
    Conversely, one comment stated that the planning distances required 
by this section are significantly greater than is warranted by the 
potential impact of the facility's worst case discharge. The Coast 
Guard disagrees and contends that the effects of tides and currents on 
discharged oil warrant these planning distances.

[[Page 7903]]

    Two comments addressed response activities for wildlife protection. 
One comment suggested that response plans be required to address issues 
such as wildlife dispersal, collection, cleaning, rehabilitation, and 
recovery. Another comment suggested that response personnel be required 
to undergo special training for wildlife response. Although the Coast 
Guard encourages facility owners or operators to identify resources for 
wildlife response, it will not require these resources to be identified 
by contract or other approved means. The applicable ACP identifies 
these private and public sector resources.
    One comment states that the facility owner or operator should be 
permitted to estimate the amount of shoreline requiring protection and 
suggested that the estimate be reviewed and approved by the COTP. The 
regulation requires the owner or operator to identify required 
quantities of boom for the protection of fish and wildlife and 
sensitive environments. Facility owners or operators will be expected 
to identify enough boom to adequately protect each of the fish and 
wildlife and sensitive environments identified in their plan.
    Another comment indicated that 1 day should be reduced from the 
planning requirement if the response equipment is determined to be 
capable of arriving in less than half of the maximum required arrival 
time. The Coast Guard encourages the early arrival of response 
resources; however, it does not plan to reduce the requirements of this 
section.
    Hazard Evaluation and Spill Scenarios. The Coast Guard received a 
total of four comments on these two topics. The comments indicated that 
the final rule should include information on hazard evaluations and 
spill scenarios. Sections 154.1035(c) and (d) has been reserved for 
these topics to ensure consistent formatting of Coast Guard and EPA 
response plan regulations and to prevent plans which contained 
information required by the EPA regulations from being rejected by the 
Coast Guard. However, because the Coast Guard does not intend to 
provide guidance on hazard evaluation or spill scenarios at this time, 
it has removed these reserved paragraphs from the final rule and has 
redesignated the remaining paragraphs of this section accordingly. It 
will continue to accept plans prepared to comply with both EPA and 
Coast Guard response plan regulations.
    Training and Exercises. The Coast Guard received one comment on 
Sec. 154.1035(c) of the regulation. It is addressed in the preamble 
discussion on Sec. 154.1055.
    Appendices. The Coast Guard received one comment on 
Sec. 154.1035(e) which contended that the information in the appendices 
is redundant with information found elsewhere in the plan and suggested 
that the appendices should not be required. The Coast Guard disagrees. 
However, it recognizes that some of the information in the appendices 
may be found in other sections of the plan; telephone numbers need not 
be listed elsewhere in the response plan if provided in the appendices.
    Facility specific information. The Coast Guard received three 
comments on Sec. 154.1035(e)(1). Two comments suggested that the Coast 
Guard should not require material safety data sheets for materials 
which are not handled by the MTR portion of the facility. The Coast 
Guard agrees and does not require this information for substances that 
are not handled by the MTR portion of the facility. The third comment 
addressed firefighting capabilities and is discussed in the appropriate 
section of Sec. 154.1045.
    Equipment lists and records. The Coast Guard received one comment 
on the Sec. 154.1035(e)(3) requirement to include equipment lists and 
records in the response plan. The comment stated that the Coast Guard 
should require the identification of equipment that would be used to 
respond to the maximum most probable discharge in addition to the 
equipment used to respond to the average most probable discharge, as 
currently required by the regulation. The Coast Guard agrees and, under 
the final rule, requires facility owners or operators to list all the 
major equipment belonging to the oil spill removal organization for 
response to a maximum most probable discharge.
    Four comments were received addressing the issue of contractor 
classification and one of these comments also addressed classification 
as outlined in NVIC 12-92. One comment urged the Coast Guard not to 
require plans to list specific quantities of equipment when listing a 
Coast Guard classified oil spill response organization (OSRO) for 
recovering volumes above the caps. This same comment urged that the 
Coast Guard and the EPA extend the classification program to include 
both coastal and inland contractors, arguing that this extension would 
enhance uniformity and improve response capabilities for large oil 
spills.
    Section 154.1035(g)(3)(iii) of the final rule states that it is not 
necessary to list response equipment from an OSRO when the OSRO has 
been classified by the Coast Guard and its capacity has been determined 
to equal or exceed the response capability needed by the facility. The 
Coast Guard will accept the listing of an appropriate OSRO for response 
resources up to and beyond the listed caps. The EPA has determined that 
it will utilize the OSRO classification system established by the Coast 
Guard. An OSRO may be classified for certain size discharges and 
operations in certain specified geographic areas. Both coastal and 
inland contractors may apply for classification by the Coast Guard.
    One comment argued that industry rather than the Coast Guard should 
certify contractors. The Coast Guard finds that this is impractical. 
The Coast Guard is concerned that inconsistencies may occur in the 
classification of OSROs unless it is conducted by one organization. At 
the present time, the Coast Guard is the appropriate agency to conduct 
on OSRO classification program. The Coast Guard plans to explore using 
third parties to inspect or approve OSROs.

Section 154.1040  Specific Requirements for Facilities That Could 
Reasonably be Expected to Cause Substantial Harm to the Environment

    The Coast Guard received 2 comments on this section of the IFR. One 
comment indicated that the requirement for significant and substantial 
harm facilities to identify a corporate organizational structure that 
would be used to manage the oil spill response under 
Sec. 154.1035(b)(3)(iii) should be applied to substantial harm 
facilities. Additionally, the comment suggested that the Coast Guard 
require contacts for wildlife response resources; however, another 
comment stated that these facilities should be required to use legally 
binding contracts for the identification of all responses resources. 
The Coast Guard disagrees. The requirements of this section were 
developed to lessen the regulatory burden and economic impact on 
substantial harm facilities. The Coast Guard has determined that the 
costs of identifying a corporate organizational structure and 
contracting for response resources outweigh the benefits for 
substantial harm facilities.
    The IFR required the owners or operators of substantial harm 
facilities to have at least 200 feet of containment boom immediately 
available to respond to the average most probable discharge. The IFR 
was unintentionally more stringent for substantial harm facilities than 
for significant and substantial harm facilities. However, under the 
final rule, the requirement has been reduced to permit facility owner 
or operators to identify 200 feet of boom and the means 

[[Page 7904]]
of deploying it that is capable of arriving at the spill site within 1 
hour of the detection of the spill.

Section 155.1041  Specific Response Information to be Maintained on 
Mobile MTR Facilities

    The Coast Guard received one comment on this section of the IFR 
which addresses contracts or training permits for wildlife response. 
This issue is addressed in the discussion of fish and wildlife and 
sensitive environment requirements in Sec. 154.1035.

Section 154.1045  Response Plan Development and Evaluation Criteria for 
Facilities That Handle, Store, or Transport Group I Through Group IV 
Petroleum Oils

    The Coast Guard received several comments addressing this section 
which concerns the inclusion of certain information in the response 
plans for facilities handling, storing, or transporting Group I through 
Group IV petroleum oils. Two of these comments addressed this section 
generally. One comment argued that the Coast Guard should require 
contracts or training and permits, for wildlife response. As indicated 
in the discussion on fish and wildlife and sensitive environments in 
Sec. 154.1035, the Coast Guard will not require these resources to be 
contracted for in the final rule.
    Another comment contended that the regulations should provide 
further guidance on matching response equipment with the grade of 
petroleum oil spilled, arguing that the groups of petroleum oil do not 
necessarily correspond to the grades of petroleum oil and that the 
grade spilled is not necessarily the grade recovered. Response 
equipment must be certified for the grade of oil handled, stored or 
transported by any facility for which the equipment is identified as a 
response resource. The Coast Guard expects that discharged petroleum 
oil will weather and that the grade of petroleum oil discharged will 
weather sufficiently to be recovered by response equipment.
    Reclassification of bodies of water. Six comments were received 
specifically addressing the COTP's reclassification of specific bodies 
of water as being operating environments needing more or less stringent 
response resource planning in Sec. 154.1045(a)(3). Four comments argued 
that significant wave height may be such that it is unsafe to conduct 
recovery operations, making more response equipment moot. These 
comments suggested that the regulation allow less response equipment if 
operation would be unsafe in wave conditions exceeding the significant 
wave height criteria during more than 35 percent of the year. The Coast 
Guard requires the facility owner or operator to plan to recover the 
oil in the operating environment in which the facility is located. As 
stated in Sec. 154.1010, the regulation establishes a planning standard 
and not a performance standard. Decisions on whether to deploy 
equipment at the time of a discharge will remain with the COTP in 
consultation with the responsible party and OSRO.
    Two comments argued that significant wave height is only one 
criterion which should be considered during the reclassification 
determination. These comments stated that the presence of debris, ice, 
currents, wind, and darkness should also be determining factors. These 
comments further argued that the standard for reducing classification 
should be the presence of prevailing wave conditions not exceeding the 
significant wave height criteria for the less stringent operating 
environment during 85 percent of the year while the standard for 
increasing classification should remain the presence of prevailing wave 
conditions exceeding the significant wave height criteria for more than 
35 percent of the year.
    The Coast Guard has retained the percentages from the IFR. The 35 
percent threshold provides balance between anticipated area 
environmental conditions and equipment available to operate in those 
conditions. Setting a lower threshold would require new areas to 
stockpile equipment with the capability of operating in unlikely 
conditions. The rule requires that ice conditions, debris, and other 
conditions as determined by the COTP must also be considered in the 
area where the facility operates.
    Requirements pertaining to average most probable discharges. The 
Coast Guard received one comment which responded to the requirements of 
Sec. 154.1045(c). It argued that the Coast Guard should clarify that 
facilities are not responsible or obligated to respond to spills from 
vessels they do not own or operate. While the Coast Guard requires the 
facility to plan for responding to an average most probable discharge 
at the facility, it remains the responsibility of the owner or operator 
of the source of the discharge to initiate effective response at the 
time of the discharge. The regulation does not require the facility to 
respond to a discharge from a vessel and the regulation has not been 
changed to state otherwise.
    Under Sec. 154.1045(c) (1) and (2) of the IFR, facility owners or 
operators are required to identify certain equipment such as 
containment boom and means of deploying and anchoring the boom, oil 
recovery devices, and recovered oil storage capacity that are capable 
of arriving at the facility within specified times to respond to the 
average most probable discharge. Upon review of the IFR, the Coast 
Guard determined that the phrase ``at the facility'' does not indicate 
that this response equipment must be available at the scene of the oil 
discharge in the specified times. Accordingly, the Coast Guard has 
revised these provisions of the final rule to require the 
identification of response equipment that is capable of arriving at the 
spill site within the times specified by this section. This change also 
applies to comparable sections in Sec. 154.1047 of subpart F, 
Sec. 154.1225 of subpart H, and Sec. 154.1325 of subpart I.
    Requirements pertaining to response to maximum most probable 
discharges. The Coast Guard received three comments in response to the 
requirements of Sec. 154.1045(d). One comment argued that the planned 
response time for possible spills in the Great Lakes should not be 
lower than it is for other bodies of water. The Coast Guard disagrees 
and has retained the 6-hour requirement for response to a maximum most 
probable discharge. The Great Lakes are unique, self-contained, bodies 
of fresh water especially vulnerable to spills. Because of this, it is 
especially important that the response capability be available to 
respond rapidly. The maximum most probable discharge response 
capability provides a base capability that can be deployed rapidly to 
the scene of a discharge to mitigate its effects.
    Several comments argued that the Coast Guard should allow resources 
located in one or more COTP zones to be moved to another zone as part 
of a response effort. The Coast Guard expects that response resources 
may be shifted in response to large pollution incidents. The rule does 
not prohibit this shifting of resources. It may be necessary for the 
facility owner or operator to confirm the availability of other 
response resources or those response resources identified in the 
response plan above the caps. The Coast Guard reserves the right to 
invalidate a plan due to the absence of available response resources to 
respond to a maximum most probable discharge or the worst case 
discharge. However, under the final rule, the COTP may impose 
operational restrictions on a case-by-case basis, such as limitations 
on the number of transfers at the facility, or, where appropriate, may 
permit the facility to operate with temporarily modified response plan 

[[Page 7905]]
development and evaluation criteria (e.g., modified response times, 
alternate response resources, etc.).
    The Coast Guard has made minor organizational changes to this 
section of the final rule to clarify the planning requirements for the 
maximum most probable discharge. These changes more clearly indicate 
that resources identified to respond to the maximum most probable 
discharge include all equipment and personnel identified to respond to 
the average most probable discharge.
    Requirements pertaining to response to a worst case discharge to 
the maximum extent practicable. The Coast Guard received 3 comments 
responding to the requirements of Sec. 154.1045(e). One comment argued 
that owners and operators should be required to plan only for a worst 
case discharge.
    The Coast Guard's authority to regulate is broader than OPA 90. 
Section 311(j)(1)(C) of the FWPCA authorizes the Coast Guard to require 
planning for discharges other than the worst case. Based on the 
recommendations of the Oil Spill Response Plan Negotiated Rulemaking 
Committee, the Coast Guard determined that the rule also should address 
operational discharges. The Coast Guard is using its FWPCA authority to 
require planning for spills other than a worst case discharge.
    Response times and tiers. The Coast Guard received 12 comments 
addressing the response time and tier requirements for worst case 
discharges (Sec. 154.1045(f)). Two of these comments dealt with the 
issue of giving credit for early arrival of response resources. One 
comment argued in favor of this proposal and suggested that such credit 
take the form of a reduction of monetary liability for a spill, a 
reduction in liability for natural resource damage assessments, or a 
reduction in drill requirements. One comment argued against issuing 
credit for early arrival. This comment specifically argued that credit 
should not be given for dispersants if such credit would result in 
planning to use a lesser amount of mechanical recovery equipment during 
a spill. The other comment argued that the Coast Guard should encourage 
early arrival of response equipment but that it should not issue credit 
for meeting an early or minimum arrival time.
    The rule is written to require the arrival of resources in a timely 
manner to contain and remove discharged oil before it has the 
opportunity for greater dispersal. The Coast Guard cannot lessen the 
monetary liability or the liability for damage to natural resources 
based on the arrival times of response resources. The early arrival of 
these resources will lessen the likelihood of damage to natural 
resources.
    The use of dispersants is a valid response technique in certain 
circumstances. A facility that handles, stores, or transports Group II 
or III petroleum oils can receive up to 25 percent credit against on-
water recovery capability in any environment with year-round 
preapproval for use of dispersants. The response plan must address the 
arrival of these dispersants within 12 hours. The Coast Guard's 
position is that the rule strikes a proper balance in planning for the 
use of dispersants and mechanical recovery.
    One comment addressed the tiering of response resources. The 
comment indicated that this approach is not useful because it does not 
allow for an initial response with all available resources. The tiering 
requirements provide a maximum time in which certain response resources 
are capable of arriving at the scene of a petroleum oil spill; they do 
not preclude the early arrival of response resources and, therefore, do 
not preclude an initial spill response with all available resources.
    The same comment also indicated that the evaluation of the 
equipment's recovery capacity should not be based on the equipment's 
operability in the different operating environments because those 
conditions may not exist during an actual spill response. The Coast 
Guard recognizes that the conditions and assumptions on which a 
response plan is based may not exist during an actual spill response. 
However, to develop an effective response plan, a facility owner or 
operator must identify and plan to respond in the conditions which 
normally exist in the port or at the facility. As Sec. 154.1010 
indicates, the regulation establishes a planning standard and not a 
performance standard. During an actual spill response, a final 
assessment as to the type of equipment to be deployed for response to a 
discharge will be made by the COTP in the consultation with the 
responsible party and OSRO.
    Eight comments addressed various issues concerning the amounts of 
time allotted for responding to an oil spill. Two comments argued that 
facilities in higher volume port areas and the Great Lakes should plan 
using 48-hour response times for Tier 3 response resources. Two 
comments urged the Coast Guard to increase the Tier 1 response time to 
12 hours as opposed to 6 hours for higher volume port areas. Four 
comments argued that the response times should be the same regardless 
of the location of the spill. These comments further contended that the 
major reason for requiring shorter times should be for fish and 
wildlife and sensitive environment purposes, which varies for vessels 
but seems irrelevant for stationary facilities. Two comments argued 
that the response times were too low in light of the levels agreed upon 
at the Negotiated Rulemaking meetings. One of these comments urged the 
Coast Guard to reconsider these response times because current response 
times are difficult and expensive to achieve. One comment urged the 
Coast Guard to review and revise the response times in light of 
response capability. This comment also urged the Coast Guard to clarify 
that response times apply to arrival on-scene rather than deployment of 
response resources and argued that the Coast Guard should only require 
first tier dispersants to be on-scene within 12 hours, with more 
dispersants being available as needed.
    The Coast Guard contends that the tiering concept is valid and 
adequately approximates the availability of response resources. The 
tiering process reflects the arrival of available response resources 
from nearby and more distant locations. The response times in this rule 
are different than those applicable to vessels. The response times for 
vessels are predicated on responding to an incident at the outermost 
boundaries of the applicable areas, including up to 6 hours on-water 
transit of response equipment. Since MTR facilities are located on or 
along the shoreline, it will not be necessary to account for extensive 
over-water transit times. The response times provided in the final rule 
are for the planned arrival of response resources at the MTR facility 
which is the likely site of the initial cleanup activity and does not 
account for on-water deployment time. Therefore, the transit times in 
this final rule are less than those provided for vessel response plans.
    One comment addressed the definition of tiers and urged the Coast 
Guard to adopt the EPA terminology and definitions of tiers to avoid 
confusion and duplication. The EPA and the Coast Guard have used the 
same approach to the concept of tiering response resources. Tier has 
been defined under Sec. 154.1020 of the final rule.
    Identification of firefighting capability. The Coast Guard received 
several comments on firefighting capability requirements 
(Sec. 154.1045(j)). Because many of the requirements for firefighting 
capability in this section also are contained in Secs. 154.1047 and 
154.1049, comments addressing those sections also will be discussed.

[[Page 7906]]

    Two comments suggested that the coordinator of firefighting 
activities for a facility should be extremely familiar with the 
facility and its operations. Additionally, one comment argued that 
``sufficient firefighting capacity'' would be difficult to define and 
should not be included in the rule. Another comment urged the Coast 
Guard to develop more specific firefighting requirements.
    The many variables involved in the design and construction of MTR 
facilities, the products handled, and the conditions encountered in an 
actual fire, preclude the development of a fixed definition or formula 
for calculating ``sufficient firefighting capacity.'' The IRF and the 
final rule require a facility owner or operator to provide an in-house 
expert to work with the local and facility firefighting resources. This 
in-house expert is responsible for verifying that the firefighting 
resources are sufficient to respond to a worst case scenario. The Coast 
Guard believes that this approach is flexible enough to be adapted to 
the peculiarities of different facilities, and at the same time, 
provides the best practical assurance that the firefighting resources 
identified in the plan will be able to handle a fire or explosion 
resulting in a facility's worst case discharge scenario.
    One comment argued that firefighting should be addressed by the 
facility itself along with its local fire department. As written, the 
rule requires a facility owner or operator to work with local fire 
departments through an in-house expert when developing and implementing 
response planning requirements. The rule requires additional 
firefighting capability, ensured by contract or other approved means, 
only when both the facility's firefighting resources and the local 
firefighting resources are inadequate.
    One comment argued that petroleum oil fires are so rare that 
firefighting contracts should not be required. The Coast Guard 
disagrees. A facility owner or operator must be prepared to respond to 
any situation which may cause or arise from a petroleum oil discharge 
into the marine environment. Section 311(j)(5)(C)(iii) of the FWPCA 
requires resources to remove, mitigate or prevent a discharge including 
one caused by fire. The Coast Guard has consistently interpreted this 
provision to authorize the requirement that response plans ensure the 
availability of firefighting resources by contract or other approved 
means.
    One comment suggested that the Coast Guard cross-reference other 
applicable firefighting sections of the regulation (Secs. 154.1047 and 
154.1049). The Coast Guard has determined that these requirements 
should be set out in each section for ease of reference.
    Consistency with ACP(s). The Coast Guard received one comment on 
Sec. 154.1045(k). This comment argued that according to the IFR, a 
response method not mentioned in the ACP would be considered 
appropriate to protect fish and wildlife and sensitive environments. 
This comment suggested that the Coast Guard change the language of the 
IFR to indicate that the response plan must be consistent with the 
appropriate ACP.
    The Coast Guard has revised this section of the final rule to state 
that any plan submitted 6 months or more after the appropriate ACP is 
published must be consistent with that ACP. A plan that is consistent 
with that ACP must at least identify the fish and wildlife and 
sensitive environments covered by the ACP; however, a facility owner or 
operator who has identified additional fish and wildlife and sensitive 
environments also may identify these areas in the plan. The IFR 
provision was developed so that the facility owner or operator who 
submitted a response plan prior to the publication of the ACP would not 
be required to resubmit or amend the plan once the ACP was published or 
at the time of each annual revision of the ACP. However, since the 
publication of the IFR, all of the ACPs have been published; therefore, 
all facility owners or operators making initial plan submissions under 
the final rule, the required annual update, or resubmitting plans at 
the plan's 5-year resubmission date will be required to submit plans 
which are consistent with the appropriate ACP.
    Future caps review process. The Coast Guard received seven comments 
which addressed the provisions of Sec. 154.1045(m) regarding the review 
of caps in the years 1998 and 2003. One comment argued that the Coast 
Guard should delete the 1998 cap increases until the need for such 
increases is assessed. This comment contended that the percentage 
increase as noted currently in the regulations is arbitrary and instead 
should be based on valid data.
    One important goal of OPA 90 is to increase the overall oil spill 
response capability in the United States. The Coast Guard believes that 
setting the 1998 cap now provides a clear upper target for which 
facility owners or operators and the oil spill response industry must 
plan. The Coast Guard, however, will conduct an evaluation of the 1998 
cap increase to determine if it remains practicable before it becomes 
effective.
    Four comments suggested that if the spill history of a facility 
between 1993 and 1998 is consistently better than required, then the 25 
percent increase in caps should not be required. These comments argued 
that such an exemption would encourage a quick response to an oil 
spill. Although the Coast Guard encourages rapid response to an oil 
spill, it does not believe that exempting certain facilities from the 
cap increases will expedite a facility's spill response. Additionally, 
this option does not move toward Congress's goal to increase the 
overall spill response capacity in the United States.
    One comment suggested that planning caps be increased when the plan 
is due for resubmission rather than in 1998. The Coast Guard has 
determined that the planning caps will be increased in 1998 provided 
that the required review confirms the practicability of the increases. 
A facility owner or operator will not be required to incorporate these 
caps into their plans until the Coast Guard completes the review.
    One comment suggested that the caps be rejected because the Coast 
Guard offers no rationale for the levels prescribed. This comment 
further suggested that the Coast Guard reevaluate its approach to caps 
and instead base it on an analysis of what would be a response to the 
maximum extent practicable. Alternatively, this comment suggested that 
the cap increases in Table 5 of the regulations would be acceptable if 
the amounts were doubled initially.
    As discussed in the VRP NPRM (57 FR 27514, June 19, 1992), the caps 
set out in the IFR were established by the Coast Guard upon 
recommendation by the Negotiated Rulemaking Committee. The Committee 
recognized that the current limits on response technologies would 
require a cap to be placed on the amount of response resources required 
to be identified for responding to a petroleum oil discharge to the 
maximum extent practicable. The caps established in the IFR reflect the 
Coast Guard's assessment of the overall response capability that can be 
achieved in the United States by 1998 taking into account factors such 
as anticipated advances in skimming efficiencies and technology, the 
development of high rate response techniques, and other applicable 
response technologies.
    Identification of equipment above Tier 3 cap. One comment was 
received addressing this provision. It argued that the capability may 
not exist to meet this requirement. Through its discussions with 
representatives of the spill response industry, the Coast Guard has 
determined that adequate response 

[[Page 7907]]
resources are currently available to enable facility owners or 
operators to meet this requirement. The final rule requires the 
identification of response equipment above the Tier 1 and 2 caps, as 
well as the Tier 3 cap. Since there is no requirement to contract for 
these resources, this is not a significant change. Response plans 
submitted prior to the IFR, following the guidance in NVIC 7-92, 
readily met this requirement.

Section 154.1047  Response Plan Development and Evaluation Criteria for 
Facilities That Handle, Store, or Transport Group V Petroleum Oils

    The Coast Guard received three comments on this section which 
requires the inclusion of certain information in response plans for 
facilities involving Group V petroleum oils. One comment addressed this 
section generally, asking for clarification of the term ``the impact of 
such discharges'' in paragraph (c)(4) of this section which requires 
the identification of equipment necessary to assess the impact of a 
worst case discharge of Group V petroleum oils to the maximum extent 
practicable. The physical characteristics of Group V petroleum oils 
make them likely to sink when spilled. As a result, traditional 
response techniques such as containing the spread of the oil on the 
surface of the water are often ineffective against these petroleum 
oils. The Coast Guard has required equipment to assess the impact of 
Group V petroleum oil discharges because that impact cannot be 
ascertained by the usual methods such as visual examination. The impact 
of discharges of Group V petroleum oil will only be detectable through 
the use of such methods as sonar or sampling equipment which can, for 
example, ascertain what petroleum oil has sunk to the bottom or remains 
suspended in the water column.
    Response time for deployment of response equipment. One comment was 
received which concerned the provisions in Sec. 154.1047(d) regarding 
the required response time for deployment of equipment. This comment 
argued that the 24-hour response time would not necessarily be the best 
for heavy petroleum oils since they are best recovered after hardening. 
This comment further argued that the Coast Guard should design more 
appropriate response times for Group V petroleum oils in general and 
asphalt in particular. The Coast Guard has designed the response times 
to ensure that an effective response is made while taking into account 
the different properties of the various petroleum oils, as well as the 
different natures of the MTR facilities and their operating 
environments. The Coast Guard recognizes that Group V petroleum oils 
react differently from other petroleum oils and this is why the Coast 
Guard separated these oils into a different category. The Coast Guard 
believes that the 24-hour response time is appropriate given the varied 
nature of Group V petroleum oils themselves, as well as the varied 
environments and conditions in which a discharge might occur.
    Firefighting capability. The Coast Guard received one comment 
addressing the requirements for firefighting capability contained 
within Sec. 154.1047(e). This comment argued that ``sufficient 
firefighting capacity'' would be difficult to define and should not be 
included in the rule. This comment further argued that firefighting 
should be addressed by the facility itself along with its local fire 
department. Identical comments were also made to Secs. 154.1045 and 
154.1049. See Sec. 154.1045 of this preamble for the Coast Guard 
response.

Section 154.1049  Response Plan Development and Evaluation Criteria for 
Facilities That Handle, Store, or Transport Non-Petroleum Oil

    Firefighting capability. The Coast Guard received one comment 
addressing the requirements for firefighting capability contained 
within Sec. 154.1049(e) of the IFR. This comment argued that 
``sufficient firefighting capacity'' would be difficult to define and 
should not be included in the rule. This comment further argued that 
firefighting should be addressed by the facility itself along with its 
local fire department. Identical comments also were made to 
Secs. 154.1045 and 154.1047. See Sec. 154.1045 of this preamble for the 
Coast Guard response.
    Non-Petroleum Oils. The Coast Guard received comments addressing 
the issue of whether the requirements set forth in the IFR for 
petroleum oils should apply to animal fats and vegetable oils and other 
non-petroleum oils. The comments proposed that animal fats and 
vegetable oils should be more clearly differentiated from petroleum 
based oils. The comments also suggested allowing unique response 
procedures for non-petroleum oil spills.
    In support of their proposals, the comments provided an industry 
sponsored study entitled ``Environmental Effects of Releases of Animal 
Fats and Vegetable Oils to Waterways'' and an associated study. The 
study claimed that the presence of these oils in the environment does 
not cause significant harm. The study reached its conclusion based upon 
its assertions that animal fats and vegetable oils are not toxic to the 
environment; are essential components of human and wildlife diets; 
readily biodegrade; and are not persistent in the environment like 
petroleum oils. The industry study also found that these oils can coat 
aquatic biota and foul wildlife, causing matting of fur or feathers 
which may lead to hypothermia; and that animal fats and vegetable oils 
in the environment have a high Biological Oxygen Demand which could 
result in oxygen deprivation where there is a large spill in a confined 
body of water that has a low flow and a low dilution rate.
    The comments acknowledged that the International Maritime 
Organization (IMO) Subcommittee on Bulk Chemicals recently recognized 
the potentially harmful effect on birds from contact with floating 
animal fats and vegetable oils discharged from vessels. The comments 
also conclude, based upon Coast Guard data, that the likelihood of a 
non-petroleum oil spill of a magnitude to cause environmental harm is 
extremely small. Additionally, the comments noted the differences in 
the average size of the vessels which carry petroleum and non-petroleum 
oils.
    In the preamble to the VRP IFR, the Coast Guard disagreed with 
comments on the VRP NPRM which claimed that edible oils pose less 
relative risk to the environment. The environmental effects of 
discharges of non-petroleum oils are clearly documented and in many 
respects are similar to the environmental effects of discharges of 
petroleum oils.
    In letters to the docket, the Department of the Interior (DOI), the 
National Oceanic and Atmospheric Administration (NOAA), and the U.S. 
Fish and Wildlife Service (FWS) discussed the environmental effects of 
discharges of animal fats and vegetable oils and other non-petroleum 
oils. DOI, NOAA and FWS all concluded that these oils pose risks to the 
marine environment when spilled.
    The agencies attributed the detrimental effects of non-petroleum 
oils to the similarity in physical properties between petroleum and 
non-petroleum oils. The effects outlined by DOI and NOAA include 
physical coating of bird feathers and mammal fur leading to 
hypothermia, a loss of buoyancy, and subsequent morality. All three 
agencies also confirmed the industry report's conclusion that 
discharges of non-petroleum oils can result in increased Biological 
Oxygen Demand in receiving waters, thereby decreasing available oxygen 
in the 

[[Page 7908]]
affected waterbody and often resulting in fishkills. NOAA also stated 
that coconut and palm oils are very viscous and when spilled in most 
coastal waters would behave like Crisco (a hydrogenated animal fat) 
probably persisting for over a decade.
    The Fish and Wildlife Service letter specifically responded to the 
industry sponsored study. The FWS expressed great concern over the 
veracity of many of the study's conclusions. The FWS characterized the 
industry study as ``misleading, weak and erroneous'' and stated that 
``key facts have been misrepresented, are incomplete or are omitted,'' 
and that ``[t]he biggest oversight of the (industry study) is the 
insignificance given to the fouling potential of the edible oils.''
    The FWS acknowledged that there are differences between petroleum 
and non-petroleum oils including different toxicity levels. It pointed 
out that physical fouling is similar for both petroleum and non-
petroleum oils, and additionally, that the removal of non-petroleum 
oils can be more difficult and strenuous for the wildlife because, in 
many instances, complete removal can only be accomplished with scalding 
hot water and excessive washing. The FWS also stated that wildlife 
rehabilitators consider edible oils and fats to be some of the most 
difficult substances to remove from wildlife because the low viscosity 
of these oils allows deeper penetration into the plumage of fur, 
creating a more thoroughly contaminated animal.
    The FWS was extremely critical of the industry study for suggesting 
that ingestion of edible oils is harmless to wildlife. The FWS stated 
that the study misleads uninformed readers by not clarifying that these 
oils, if consumed in large quantities, will cause harm to organisms 
through means other than toxicity. For example, according to the FWS, 
the ingestion of large quantities of non-petroleum oils can cause lipid 
pneumonia, diarrhea, and dehydration in birds or other wildlife which 
try to clean these oils from their feathers or coats by preening. This 
problem is magnified, also according to the FWS, by the fact that these 
oils do not have a repugnant smell or iridescent appearance to frighten 
wildlife away, therefore making it more likely that wildlife will come 
in contact with them during a spill.
    In addition to the agency letters, the Coast Guard has placed in 
the docket several studies attesting to the harmful effects of non-
petroleum oils in the environment. One such study, conducted by the 
International Maritime Organization (IMO) is titled ``Harmful Effects 
on Birds of Floating Lipophilic Substances Discharged from Ships.'' 
This study examined the literature concerning non-petroleum oils 
spilled into the environment and concluded that a number of lipophilic 
substances, including vegetable oils, cause lethal harm to birds as a 
specific group of marine life. The study found that lipophilic 
substances adhere to the feathers of seabirds due to the lipophilic 
character of the feathers' wax layer. This causes the grid structure of 
the plumage to be disrupted thereby destroying its insulating 
properties.
    The IMO study gives numerous examples of lethal contamination of 
seabirds by lipophilic substances spilled from ships. These examples 
include the death of thousands of seabirds because of a discharge of 
palm oil off the Netherlands coast; over 300 dead birds as a result of 
a 1,000-liter spill of rapeseed oil into the harbor of Vancouver, 
Canada; diseased gannets found along the Dutch coastline whose plumage 
was found to be coated with paraffin and consequently was no longer 
water repellent; and surveys of Dutch beaches in 1990 which found that 
25 percent of the dead birds washed ashore were at least partly 
contaminated with vegetable oils. The IMO study also warns that a 
serious discharge of lipophilic substances in the open sea would cause 
more harm to seabirds than a nearshore discharge because the birds in 
the open sea would be unable to rest on shore to clean their plumage.
    For these reasons, the Coast Guard has determined that a worst case 
discharge of animal fats or vegetable oils or other non-petroleum oils 
from an MTR facility could reasonably be expected to cause harm to the 
environment. Therefore, facilities that handle, store, or transport 
these oils, and meet the requirements of Sec. 154.1015(b), are required 
to prepare and submit response plans. If the facility meets the 
criteria in Sec. 154.1015(c) for a facility that could cause 
significant and substantial harm, the response plan must be approved by 
the Coast Guard.
    Because there is insufficient data to support a finding that a 
spill of a large quantity of animal fats or vegetable oils or other 
non-petroleum oils will have less adverse impact on the environment 
than a spill of other kinds of oil, the Coast Guard does not believe 
that a facility that handles, stores, or transports these oils should 
have reduced response requirements from those provided in the IFR. 
However, the Coast Guard does acknowledge that animal fats and 
vegetable oils or other non-petroleum oils may behave differently from 
petroleum or petroleum-based oils and has created new subparts H and I 
to address response plan requirements for these oils. For further 
information see the discussions of subparts H and I in this preamble.
    The Coast Guard received one comment which requested the suspension 
of the IFR's implementation until hearings can be held on amending the 
rule to exclude animal and vegetable fats from these regulations. The 
Coast Guard disagrees. Animal fats and vegetable oils are considered to 
be oils under the FWPCA. They are specifically defined as non-petroleum 
oils in the final rule and may result in serious harm to the 
environment in the event of a discharge to navigable waters. For 
additional information on this issue, see response to similar comments 
in Sec. 154.1015.

Section 154.1050  Training

    The Coast Guard received 15 comments on this section. The comments 
were not in agreement about whether the Coast Guard should include more 
specific training requirements in the final rule. Three comments stated 
they wanted more detailed standards to define the frequency of 
refresher courses and the minimum level of Occupational Safety and 
Health Administration (OSHA) training required. One comment suggested 
making training requirements compatible with EPA standards. Five 
comments were against developing any additional training requirements.
    The Coast Guard has not modified the training requirement of this 
section in the final rule; however, a new appendix D entitled 
``Training Elements for Oil Spill Response Plans'' has been added to 
subpart 154 to provide guidelines to facility owners or operators for 
the development of the training portions of their response plans. 
Additionally, training guidelines for facility response plans, 
including refresher training, are defined in OSHA standards for 
emergency response operations in 29 CFR part 1910, appendix D. As 
indicated in appendix D to part 154, the specifics of the training 
program should be determined by the facility owner or operator. On the 
job training and experience may cover parts or all of the training 
requirements, as appropriate.
    Many comments remarked that the responsibility of a facility owner 
or operator to ensure adequate training of all private response 
personnel in Sec. 154.1050(d) is inappropriate, costly, and possibly 
duplicative when an OSRO also is required to demonstrate training. One 
comment argued that the Coast Guard should require OSROs rather than 
the owners or operators to be 

[[Page 7909]]
responsible for training employees and maintaining proper records. The 
Coast Guard disagrees. While the owner or operator of the facility may 
shift training requirements to an OSRO through contract or agreement, 
the owner or operator of the facility remains responsible to ensure 
that adequate trained response resources are available.
    One comment suggested specifying that OSHA retains enforcement 
authority for working conditions not addressed by Coast Guard 
standards. The Coast Guard agrees, but does not find it necessary to 
state that enforcement of the OSHA standards remains with that agency.
    One comment mentioned that facilities handling only edible oils 
should be exempt from the training requirements. The Coast Guard 
believes training standards are necessary for MTR facilities regardless 
of the specific type of oil handled, stored, or transported. Therefore, 
the Coast Guard will not change the requirements.
    One comment remarked that it was not practical to ensure that 
volunteers and casual laborers have OSHA training. In Sec. 154.1050 
(a), the Coast Guard requires only that a ``method of training'' be 
identified to comply with the requirements of 29 CFR 1910.120. 
Volunteers and casual laborers who are not trained or familiar with 
hazards associated from contact with oil must be trained to meet OSHA 
requirements.

Section 154.1055  Exercises

    The Coast Guard has extensively revised Sec. 154.1055 which was 
previously entitled ``Drills'' and is now entitled ``Exercises.'' The 
changes make the terminology in the final rule consistent with the 
National Preparedness for Response Exercise Program (PREP). In response 
to the need to provide facility owners or operators with additional 
direction on conducting exercises, the Coast Guard has revised this 
section to specify that compliance with PREP fulfills all exercise 
requirements. However, participation in the PREP itself remains 
voluntary. If an owner or operator does not choose to participate in 
the PREP, they may develop their own program for compliance with the 
exercise requirements in this regulation.
    The National Preparedness for Response Exercise Program (PREP) was 
developed through a joint effort of the Federal agencies implementing 
OPA 90 response plan regulations and other Federal representatives 
(e.g., natural resource trustees), state agencies, members of the 
regulated community, and OSROs. Four public workshops were announced in 
the Federal Register and were conducted in Washington, DC, and Tampa, 
FL. These efforts resulted in the creation of unified requirements that 
reduce the possibility of owners and operators having to participate in 
numerous duplicative exercises. Following the PREP guidelines has been 
determined to be an acceptable means to satisfy the OPA 90 
requirements.
    Equipment. The Coast Guard received 16 comments on 
Sec. 154.1055(a)(3), equipment deployment drills. One comment argued 
that facility owners and operators should not be penalized when 
response resources are not available due to a real emergency. The Coast 
Guard recognizes that actual availability of response resources may be 
limited by unforeseeable events such as multiple simultaneous oil 
spills.
    Three comments requested additional information on equipment 
deployment. Another wanted specific information on equipment deployment 
drills for facilities that have no equipment of their own. One comment 
stated that the Coast Guard should remove mandatory equipment 
deployment for the entire plan drill. Two comments remarked that it 
would be better to require one major equipment deployment exercise in 
each COTP zone every 3 years. Another comment suggested that full scale 
drills should determine only the response time of contractors and test 
only strategic personnel, and not require equipment deployment. The 
Coast Guard's position is that equipment deployment exercises are vital 
for maintaining readiness and for testing the effectiveness of a 
facility's response plan. The revised Sec. 154.1055 continues to 
require semiannual equipment deployment exercises for facility owned or 
operated equipment and annual equipment deployment exercises for OSRO 
equipment. These standards are in accord with the requirements of the 
PREP program.
    Frequency. Several comments remarked that the costs of drills were 
excessive. Many suggested that the frequency of various drills should 
be decreased. Two comments requested additional details on frequency of 
drills and credit provisions for separate drill elements
FR Doc. 96-4274 Response Plans for Marine Transportation-Related Facilities
. Two comments 
also suggested that the number of drills required should be decreased 
over time because they lose effectiveness. As indicated earlier, the 
Coast Guard has revised the exercises section of the final rule to be 
in accordance with PREP. It has adjusted the frequency of some 
exercises. Qualified individual notification exercises are required 
quarterly instead of monthly and whole plan exercises may now be 
carried out in parts rather than all at once. The Coast Guard believes 
exercises continue to be effective over time as equipment and personnel 
change.
    A significant number of comments suggested that credit be given for 
equipment and personnel drill requirements when other drills provide 
adequate practice. The different kinds of required exercises test 
different aspects of a response plan. However, if an exercise includes 
components which fulfill the requirements for some other type of 
required exercise (e.g., an equipment deployment exercise that includes 
a qualified individual notification) then both requirements may be 
fulfilled by the single exercise.
    Two comments suggested that an actual response situation should 
credit some drills. In this final rule, the Coast Guard has made 
participation in the PREP program satisfy all exercise requirements. 
Under PREP, facilities which have an actual response situation may get 
exercise credit. For more detailed guidance the PREP guidelines should 
be consulted.
    Six comments remarked that participation in one drill by a spill 
management team (SMT) should meet the requirements for all facilities 
using that team. The PREP guidelines address this concern in detail; 
PREP allows multiple facilities using the same SMT to receive credit 
for a single exercise of that SMT as long as the specified criteria are 
met.
    Seven comments wanted other Federal, state, or local drills to 
credit Coast Guard drills where appropriate. The Coast Guard has no 
control over whether other agencies give credit for Coast Guard 
exercises.
    One comment suggested that the Coast Guard coordinate nationally to 
determine that credit be given only for personnel and equipment which 
actually participated in drills. The Coast Guard requires that the 
facility maintain records of exercises; and that these records be made 
available to the COTP upon request. A facility that lists an OSRO 
located outside the facility's COTP zone must still satisfy the 
facility's own COTP that the listed OSRO has fulfilled the applicable 
exercise requirements. Any facility which does not satisfy the 
applicable COTP that it has fulfilled its exercise requirements is 
subject to enforcement action by the COTP under this regulation. The 
Coast Guard believes that the existing requirements are sufficient to 
ensure that all personnel and equipment listed in facility response 
plans are exercised at the appropriate intervals.
    Details of plan. The Coast Guard received 6 comments suggesting 

[[Page 7910]]
    wording changes. One general comment was received discussing the need 
for more detailed guidance. Due to extensive revisions of this section, 
these changes would not be applicable and, therefore, will not be 
incorporated into the text.
    Unannounced drills. Some comments requested that the Coast Guard 
decrease the number of unannounced drills required by Sec. 154.1055(b) 
to one drill every 1, 2, or 5 years. Many argued that unannounced 
drills were too costly and should either be limited due to economic 
concerns or not required at all. Some also remarked that such drills 
were unnecessary due to the need for other drills. Some comments 
asserted that operations should not be disrupted by unannounced drills. 
Others wanted facility owners and operators to be compensated for the 
cost associated with unannounced drills. Two comments suggested that 
OSROs and SMTs should only be activated if experience and available 
resources were believed to be inadequate, two others remarked that only 
the SMT should be activated. One comment suggested focusing on the 
initial callout only. A few comments asked that the unannounced drills 
be limited in scope, kept short and only required after 24-hour 
notification. One comment suggested requiring notification of the Coast 
Guard during an unannounced drill and having the Coast Guard observe 
the drill rather than requesting their own drills separately. Finally, 
one comment questioned whether customers would be expected to 
participate in unannounced drills and wondered who would be liable for 
the costs incurred. The Coast Guard finds that unannounced exercises 
serve an important purpose in maintaining response resource readiness. 
The final rule states that annually one of the required exercises 
(spill management team tabletop, equipment deployment, or emergency 
procedures) must be conducted unannounced. Unannounced means that the 
personnel participating in the exercise must not be advised in advance 
of the exact date, time and scenario of the exercise. Additionally, the 
facility owner or operator may be required by the COTP to conduct an 
unannounced exercise at the facility. These COTP initiated exercises 
will be limited to average most probable discharge exercises as 
outlined in the facility's response plan. Such exercises involve 
notifications and equipment deployment. Each COTP will limit the number 
of COTP initiated unannounced exercises to no more than 4 per year. If 
a facility owner or operator participates in an unannounced exercise 
initiated by the COTP, the facility will be exempt from participating 
in a COTP initiated unannounced exercise for at least 3 years.
    Records. The Coast Guard received 5 comments on Sec. 154.1055(d), 
stating that the facility owner or operator should bear the 
responsibility for keeping and maintaining the records at the facility 
along with the plan. The comments asserted that it would suffice to 
have the records signed by an authorized federal representative at the 
drill site, rather than having the records sent to the Coast Guard. The 
Coast Guard has changed Sec. 154.1055 to reflect this comment. The 
section now requires records to be maintained at the facility for 3 
years and be made available to the Coast Guard upon request.

Section 154.1060  Submission and Approval Procedures

    The Coast Guard received 9 comments addressing the proposed 
requirement for a maximum validation period of up to 5 years. Three 
comments did not support having a plan expiration date at all, 
suggesting that the Coast Guard would not have sufficient time to 
approve the new plans. Four comments suggested that substantive changes 
as a result of major NCP or ACP revisions should not require plans to 
be resubmitted until the 5-year term is complete. Several comments did 
not want facility owners or operators to be required to resubmit plans 
when no substantive changes were made. One comment asked for 
clarification as to whether plans must be resubmitted to the Coast 
Guard 5 years from the date of COTP approval or every 5 years, 
regardless of whether there have been revisions.
    OPA 90 requires a facility owner or operator to resubmit response 
plans to the Coast Guard for information or approval, as appropriate. 
In the IFR, the Coast Guard required that response plans must be 
resubmitted every 5 years regardless of whether any revisions have been 
made. In his memorandum of April 21, 1995, President Clinton directed 
agencies to reduce by one-half the frequency of regularly scheduled 
reports that the public is required to provide to the Government. An 
exception to this requirement is provided when the agency head 
determines that such action would not adequately protect the 
environment or would impede the effective administration of the 
agency's program. The Coast Guard has reviewed the need for 
resubmission of response plans at 5-year intervals, and has concluded 
that extending this to 10 years would not ensure that plans were still 
viable and would not meet the goal of OPA 90, to improve the response 
to spills of oil. Changes in technology and in available response 
resources over a 5-year period may make a response plan fall below 
acceptable standards. To effectively administer an oversight program 
and ensure that the maximum practicable response capability is being 
utilized, review of response plans at 5-year intervals is considered to 
be an appropriate balance between program needs and reporting burden. 
The Secretary of Transportation has approved retaining the requirement 
to submit response plans at a maximum interval of 5 years.
    Although the plans need not be resubmitted until the end of the 5-
year term, major revisions to a response plan as set out in 
Sec. 154.1065(b) must be sent to the COTP within 30 days; and 
deficiencies in an originally submitted plan or a 5-year resubmission 
of a plan, must be corrected within the time specified by the COTP. NCP 
or ACP changes will not require resubmission of the plan until the 5-
year term is complete. The requirements for plan resubmission after the 
5-year term are set out in Sec. 154.1060 of the final rule. The COTP 
will notify the facility owner or operator in writing of the status of 
the plan.
    Another two comments requested 60 days rather than 30 days to 
forward major plan corrections to the COTP in response to COTP noted 
deficiencies in the originally submitted plan, or a 5-year plan 
resubmission. Several comments proposed that the COTP determine the 
time period for sending such plan corrections, but that the period be 
not less than 30 days. As a result of the comments on the 30-day time 
limit for sending plan corrections to the COTP in response to COTP 
noted deficiencies, the Coast Guard has changed this provision and now 
requires that a facility owner or operator correct noted deficiencies 
within the time period provided by the COTP. This adjustment allows for 
greater flexibility in determining an appropriate time period based on 
the corrections needed.
    Two comments expressed concern over the number of copies needed to 
review the facility response plan, and asserted that only one copy was 
needed by the COTP. The comment also argued that the COTP need not 
return the approved plan, but instead, that an approval notice would be 
sufficient. The Coast Guard has changed Sec. 154.1060 of the final rule 
to require only one copy of the plan to be submitted to the COTP. 
Additionally, one copy of the plan must be maintained at the facility 
in a 

[[Page 7911]]
position where the plan is readily available to persons in charge of 
conducting transfer operations.
    Two comments suggested that a copy of the plan should be forwarded 
to the state water pollution control agency and the emergency response 
organization's and be available to the local response organizations 
upon request. Any state agency which desires a copy of the response 
plan should request one from the facility owner or operator directly. 
The Coast Guard cannot involve itself in matters which would be largely 
governed by state statute. In order to fulfill the requirements for 
exercises under Sec. 154.1055, OSROs must be familiar with any response 
plans in which they are listed. The Coast Guard leaves to the owners or 
operators and their OSROs the specific method by which the OSROs will 
gain the needed familiarity with the plan.
    One comment stated that there should be an appeals process, 
allowing the facility owner or operator to contest the COTP decision. 
Both the IFR and the final rule already contain an appeal process 
located in Sec. 154.1075 and entitled ``Appeal process.''

Section 154.1065  Plan Review and Revision Procedures

    The Coast Guard received 6 comments on the revision of plans. Four 
comments requested that the facility owner or operator be given at 
least 6 months to incorporate major revisions into the plan. One 
comment suggested that the rule needed a better definition of which 
facilities are required to revise plans. Another comment requested 
clarification of which revisions to facility plans require notification 
of the Coast Guard.
    Section 154.1065 requires all facilities to review their plans 
annually and to send any revisions to the COTP for information or 
approval; or if no revisions are made during the course that year, the 
facility owner or operator must certify by letter to the COTP that the 
plan remains valid with no revisions. Revisions which must be submitted 
to the COTP for approval or inclusion in the plan are listed in 
Sec. 154.1065(b). Requirements for 5-year plan resubmission have been 
removed from Sec. 154.1065(b)(7) and now are specified in 
Sec. 154.1060(e) of the final rule.
    The Coast Guard received two comments recommending that plan 
revisions be sent to the COTP before planned actions occur, to ensure 
COTP approval. A 30-day period for approving a plan was also suggested. 
In order to meet the statutory requirements of OPA 90, facilities must 
operate in full compliance with their submitted response plan. the 
Coast Guard concludes that a 30-day period is appropriate for COTP 
action on submitted revisions(s); and as an effective date for 
submitted revision(s). This final rule provides that when revision(s) 
to a plan are necessary, the facility owner or operator must submit the 
proposed revision(s) to the COTP. The COTP will review the proposed 
revision(s) and will provide any necessary feedback to the facility 
owner or operator within 30 days. The revisions will become effective 
not later than 30 days from their submission to the COTP, unless the 
COTP indicates otherwise.
    Another comment argued that requiring annual certification by 
facility owners and operators was too administratively burdensome to 
the Coast Guard. Five comments suggested that it should only be 
necessary to notify the Coast Guard of significant changes to the plan. 
Two comments requested that facilities be allowed to file a letter at 
the facility instead of placing it with the plan itself to avoid 
unnecessary paper buildup. The Coast Guard has reviewed this 
requirement in light of these comments and the President's directive to 
reduce reporting requirements and has eliminated the requirement to 
submit an annual certification that the owner or operator has reviewed 
the facility response plan. The regulation has been modified to reflect 
that the owner or operator is still required to annually review the 
plan and notify the Coast Guard of changes; however, no report is 
required if changes are not needed.

Section 154.1070  Deficiencies

    The Coast Guard received 6 comments addressing this section. One 
comment stressed that the Coast Guard should allow 30 days, rather than 
7, to appeal a deficiency notice from the COTP. Another comment argued 
that 60 days minimum should be allowed to correct deficiencies. Other 
comments stated that the revised plan should be submitted within a time 
period provided by the COTP, after a minimum of 30 days. It has been 
the Coast Guard's experience that the 7 day appeal limit allows 
adequate time for a facility owner or operator to make an initial 
appeal of a COTP issued deficiency and it is not expected that a 
shorter time frame would be imposed unless a significant hazard exists. 
However, because these time requirements are relatively new, the Coast 
Guard will continue to monitor this time frame as well as other time 
limits contained in the FRP appeal process and may modify the time 
limits in the future.
    One comment urged the Coast Guard to provide more detail on 
enforcement mechanisms. The Coast Guard has provided guidance directly 
to the COTPs responsible for enforcing these regulations. This guidance 
will be updated as the Coast Guard gains more experience in the review 
and usefulness of response plans.

Section 154.1075  Appeal Process

    The Coast Guard received 6 comments concerning the appeal process. 
Four comments wanted the scope of appealable issues more clearly 
defined. Another comment stated that the Coast Guard should allow a 
time period to determine whether a facility is a substantial harm, or 
significant and substantial harm facility. The comment continued by 
arguing that notification to a facility owner or operator of 
reclassification should occur within 60 days. If no response is 
received within this time frame, then the facility owner or operator 
can assume that reclassification is accepted. The comment continued by 
stating that 30 days should be allowed to appeal the COTP's decision to 
the District Commander. Another comment agreed and stressed that 
facility owners and operators should be able to appeal the COTP's 
decision that a plan is not adequate. A facility owner or operator may 
appeal any initial determination made by a COTP regarding that 
facility's plan. This includes but is not limited to, classification 
decisions, reclassification decisions and deficiency decisions. The 
Coast Guard believes the present procedures give owners or operators 
sufficient time and opportunity to appeal a decision.

Subpart G--Additional Response Plan Requirements for a Trans-Alaska 
Pipeline Authorization Act (TAPAA) Facility Operating in Prince William 
Sound, Alaska

Section 154.1120  Operating Restrictions and Interim Operating 
Authorization

    The Coast Guard received one comment recommending that it establish 
a 4-day time limit in which a 200,000 barrel spill must be removed. The 
comment also suggested changing the wording in this section by 
replacing ``provided, through an oil spill removal organization 
required by Sec. 154.1125'' with ``ensured, by contract or other 
approved means.'' The Coast Guard concludes that the required response 
times are appropriate and will ensure that adequate response is made in 

[[Page 7912]]
Prince William Sound. A set 4-day time limit would be too inflexible 
and would not take into account varying conditions. Section 154.1110 of 
subpart G requires a TAPAA facility owner or operator to meet all 
requirements of subpart F in addition to the requirements of subpart G 
itself. Because subpart F includes requirements for ensuring by 
contract or other approved means any OSRO, a restatement of the 
requirement in subpart G is unnecessarily repetitive.
    The comment also recommended that the Coast Guard include a 
statement telling facility owners or operators that plan approval for 
Prince William Sound facilities is valid only as long as the Prince 
William Sound Regional Citizens Advisory Council is funded in 
accordance with OPA 90. The Coast Guard agrees with the comment and has 
added language to Sec. 154.1120 to that effect.

Section 154.1125  Additional Response Plan Requirements

    The Coast Guard received one comment on this section stating that 
additional communities should be included for training. The communities 
suggested are Seward, Seldovia, Homer, and Kodiak, Alaska. The comment 
also argued that a minimum of 2,000 trained personnel should be 
required to remove a 200,000 barrel discharge. The Coast Guard finds 
that the existing list of communities is currently sufficient and is 
not adding the communities suggested in the comment. However, should 
circumstances change, a COTP may recommend adding ports if the spill 
training requirements are deemed appropriate. This change would be 
subject to a notice and comment rulemaking project. There were no 
specific details included in this comment as to the basis for requiring 
2,000 personnel for a spill of 200,000 barrels. The COTP has a great 
deal of experience in this type of operation, and he or she is the one 
who makes the determination as to the number of personnel necessary for 
the cleanup of a spill.

Section 154.1130  Requirements for Prepositioned Response Equipment

    The Coast Guard received one comment on this section of the IFR. 
The comment agreed that an independent inspection or certification 
entity was a good idea. The comment also stated that the section should 
be revised to include the standard for response capabilities which is 
currently 200,000 barrels per day in the Prince William Sound to 
reflect the true maximum extent practicable. Maximum extent practicable 
is based upon the planned capability to respond to a worst case 
discharge in adverse weather. The standards set forth in the IFR, and 
continued in the final rule, include a daily recovery rate of 30,000 
barrels per day on scene within 2 hours, and a daily recovery rate of 
40,000 barrels on scene within 18 hours. In addition, Sec. 154.1130 
also requires on-water storage capability of 100,000 barrels to be on 
scene within 2 hours, and on-water storage capability of 300,000 
barrels to be on scene within 12 hours. The Coast Guard concludes that 
the standards set forth are sufficient to protect Prince William Sound 
and meet OPA 90's requirement of a response to the maximum extent 
practicable.

Section 154.1140  TAPAA Facility Contracting With a Vessel

    The Coast Guard received one comment that the section on TAPAA 
facility contracting with a vessel was unclear because it referred to 
subpart G of the VRP IFR, which does not exist. The Coast Guard has 
corrected the cross reference in this section of the FRP final rule to 
refer to subpart E of the VRP final rule.

Subpart H--Response Plan Requirements for Facilities That Handle, 
Store, or Transport Animal Fats and Vegetable Oils

    This subpart establishes oil spill response planning requirements 
for an owner or operator of a facility that handles, stores, or 
transports animal fats and vegetable oils. It requires such facilities 
to also meet the applicable requirements set forth in subpart F of this 
part. This subpart, and subpart I, were created to address concerns 
that some of the criteria proposed in subpart F of this part were not 
applicable to animal fats and vegetable oils, and other non-petroleum 
oils. The specific comments on non-petroleum oils which the Coast Guard 
received are addressed in this preamble under Sec. 154.1049 which was 
the non-petroleum oils section of the IFR.
    In the preamble to the VRP IFR, the Coast Guard stated that it had 
been unable to verify that the evaporation and emulsification factors 
in appendix B of the VRP IFR were applicable to both petroleum oils and 
non-petroleum oils. As a result of that determination, non-petroleum 
oils were divided from petroleum oils in both the Vessel and MTR 
Facility Response Plan regulations.
    In response to the comments to the IFR on this issue, the Coast 
Guard is creating two new subparts and further subdividing non-
petroleum oils into three categories. Subpart H covers animal fats and 
vegetable oils, and subpart I covers other non-petroleum oils.
    These new subparts and categories are intended to form the 
foundation of possible future rulemaking efforts in this area. The 
Coast Guard welcomes information that may be useful in determining the 
types and quantities of response equipment necessary to respond to a 
discharge of these oils, and information on new or innovative response 
techniques that will be appropriate for these oils. This information 
would be helpful in deciding whether additional rulemaking is 
appropriate.
    Section 154.1225 requires owners or operators of MTR facilities 
that handle, store, or transport animal fats and vegetable oils to 
identify the procedures and equipment necessary to respond to a worst 
case discharge of these oils to the maximum extent practicable. Animal 
fats include lard, tallow and other oils of animal origin. Vegetable 
oils include oils from seeds, nuts, kernels or fruits of plants such as 
corn oil, safflower oil, jojoba oil, coconut oil or palm oil. Subpart H 
allows the owner or operator of the facility to propose the amount of 
equipment needed to respond to a worst case discharge of animal fats or 
vegetable oils to the maximum extent practicable. It does not include 
specific requirements for identifying the amount of response resources. 
The Coast Guard will evaluate the information submitted by the owner or 
operator of the facility to determine if the resources identified are 
consistent with the volume of animal fats or vegetable oils that may be 
spilled as a result of the worst case discharge. This procedure was the 
same in the IFR.
    As with petroleum oils, the owner or operator must ensure the 
availability of removal equipment through contract or other approved 
means. At a minimum, the owner or operator of the facility must obtain 
a letter from an oil spill removal organization stating that it will 
respond to a worst case discharge from the facility. It is not intended 
that this letter imply a formal contractual agreement between the 
parties but that the owner or operator has identified specific response 
resources and that those resources will respond to a worst case 
discharge from the facility.
    Section 154.1225 also requires the owner or operator of an MTR 
facility that handles, stores, or transports animal fats and vegetable 
oils to contract for firefighting resources should the facility not 
have access to sufficient local firefighting resources. For further 
discussion of firefighting 

[[Page 7913]]
resources see the preamble discussion of Sec. 154.1045(j).
    The Coast Guard has included in subpart H, for animal fats and 
vegetable oils, Sec. 154.1225(f) on the use of dispersants, and other 
similar, new, or unconventional spill mitigation techniques including 
mechanical dispersal. Response plans for facilities located in 
environments with year-round preapproval for use of chemical 
dispersants will be allowed to receive credit up to 25 percent of the 
plan's required worst case planning volume. In all cases, the 
identified response measures must comply with the NCP and the 
applicable ACP.
    The Coast Guard has included in appendix C a new paragraph 2.8 
covering non-petroleum oils including animal fats and vegetable oils.

Subpart I--Response Plan Requirements for Facilities That Handle, 
Store, or Transport Other Non-petroleum Oils

    This subpart establishes oil spill response planning requirements 
for an owner or operator of a facility that handles, stores, or 
transports non-petroleum oils other than animal fats and vegetable 
oils. It requires such facilities to also meet the applicable 
requirements set forth in subpart F of this part. This subpart was 
created to address industry concerns with grouping animal fats and 
vegetable oils together with other non-petroleum oils. This separation 
of animal fats and vegetable oils from other non-petroleum oils 
recognizes that while animal fats and vegetable oils have harmful 
effects, they are not toxic to the marine environment as maybe other 
non-petroleum oils. The specific comments on non-petroleum oils which 
the Coast Guard received are addressed in this preamble under 
Sec. 154.1049 which was the non-petroleum oils section of the IFR.
    Section 154.1325 requires owners or operators of MTR facilities 
that handle, store, or transport other non-petroleum oils to identify 
the procedures and equipment necessary to respond to a worst case 
discharge of these oils to the maximum extent practicable. Other non-
petroleum oils include those that are not animal fats or vegetable oils 
such as essential oils, turpentine and tung oil.
    Section 154.1325 allows the owner or operator of the facility to 
propose the amount of equipment needed to respond to a worst case 
discharge of other non-petroleum oils to the maximum extent 
practicable. It does not include specific requirements for identifying 
the amount of response resources. The Coast Guard will evaluate the 
information submitted by the owner or operator of the facility to 
determine if the resources identified are consistent with the volume of 
other non-petroleum oils that may be spilled as a result of the worst 
case discharge. This procedure was the same in the IFR.
    As with petroleum oils, Sec. 154.1325 requires that the owner or 
operator must ensure the availability of removal equipment through 
contract or other approved means. At a minimum, the owner or operator 
of the facility must obtain a letter from an oil spill removal 
organization stating that it will respond to a worst case discharge 
from the facility. It is not intended that this letter imply a formal 
contractual agreement between the parties but that the owner or 
operator has identified specific response resources and that those 
resources will respond to a worst case discharge from the facility.
    Subpart I also requires the owner or operator of an MTR facility 
that handles, stores, or transports other non-petroleum oils to 
contract for firefighting resources should the facility not have access 
to sufficient local firefighting resources. For further discussion of 
firefighting resources see the preamble discussion of Sec. 154.1045(j).
    Under subpart I, a response plan may propose, for other non-
petroleum oils, the use of other spill mitigation techniques provided 
that the identified response measures comply with the NCP and the 
applicable ACP.
    The Coast Guard has included in appendix C a new paragraph 2.8 
covering the evaluation of response plans for non-petroleum oils 
including other non-petroleum oils.

Appendix C of Part 154. Guidelines for Determining and Evaluating 
Required Response Resources for Facility Response Plans

    The Coast Guard received one comment recommending that special 
allowance be made for harbors since they often have conditions similar 
to rivers and canals. The comment also recommended that such special 
allowance not be limited only to waterways having depths of 12 feet or 
less. The Coast Guard disagrees. The term harbor is a broad term and 
can be applied to a sheltered part of a body of water deep enough to 
provide anchorage for ships. In reality, a harbor may range from small 
embayments to large bodies of water. Under the final rule, a harbor 
could be considered as either being in a rivers and canals operating 
environment or an inland operating environment. The 12 feet project 
depth was selected as part of the rivers and canals operating 
environment to assist in establishing the ability of response resources 
to operate in specific water depths. The Coast Guard finds that the 
depth of 12 feet remains relevant in establishing the rivers and canals 
environment or the inland operating environment.

1. Purpose

    The Coast Guard did not receive comments to this section but has 
revised appendix C to reference the newly created subparts H and I and 
indicate the portions of appendix C which are applicable.

2. Equipment Operability and Readiness

    2.5  The Coast Guard received 2 comments on this paragraph. Both 
comments asked whether Table 1 adverse weather conditions can be 
reduced or increased if the Area Committee determines that the 
conditions listed in the table are not appropriate. Both comments also 
recommended that the local COTP be allowed to determine the applicable 
weather conditions until the ACP is finalized. The comments also 
requested a mechanism for input by the regulated community to the Area 
Committee before that committee's determinations are completed.
    The COTP may reclassify a specific body of water or location within 
the COTP zone. Section 154.1045 provides details on COTP 
reclassification to more or less stringent operating environments. The 
Coast Guard has issued guidance that strongly encourages Area 
Committees to solicit advice, guidance, and expertise from all 
appropriate sources including facility owners or operators, OSROs, 
environmental groups, members of academia, and concerned citizens.
    2.6  The Coast Guard received one comment on this paragraph. The 
comment noted that currently the Coast Guard, EPA and RSPA each have a 
different planning speed and recommended that a single standardized 
speed be adopted. The Coast Guard agrees and the Coast Guard, EPA, and 
RSPA will use the same planning speeds.
    2.7  The Coast Guard received one comment on this paragraph. The 
comment recommended that each type of boom only be required to have 
compatible connectors with the same type of boom because, for example, 
there would be no reason to connect high seas boom to harbor or river 
boom. This statement in the appendix is there only to remind facility 
owners or operators to ensure that the equipment on which they are 
going to rely in the event of an oil spill will be capable of 

[[Page 7914]]
carrying out the function for which it is intended. If boom of varying 
types will never be used together, the need for compatible connectors 
is moot.
    2.8  The Coast Guard has added paragraph 2.8 covering the newly 
created subparts H and I.

3. Determining Response Resources Required for the Average Most 
Probable Discharge

    3.1  The Coast Guard received one comment on this paragraph. The 
comment expressed concern that under the IFR's current language small 
facilities would be required to purchase booms and boats rather than 
contracting for them. It recommended that the language be amended to 
require only a ``means of initiating deployment.'' The Coast Guard 
disagrees. Section 154.1045(c) provides for the use of contracted 
response resources for an average most probable discharge provided that 
the responders can meet the stated response times.
    3.2.1  The Coast Guard received one comment on this paragraph. The 
comment proposed that the Coast Guard amend the language on required 
boom length to read: ``two times the length of the largest vessel * * * 
or the amount needed to contain a 50 barrel discharge during a transfer 
operation.'' The Coast Guard disagrees. Requiring an amount of boom to 
contain only a ``50 barrel discharge'' could result in many variations 
between facilities. Requiring a minimum of 1,000 feet creates a more 
uniform standard.
    3.2.2  The Coast Guard received one comment on this paragraph. The 
comment said that the Coast Guard should require a minimum level of 
sorbent material to support other recovery equipment. The Coast Guard 
disagrees. While sorbents are effective in certain circumstances, they 
are not considered major spill response equipment. They are expendable 
resources and may be used during routine facility operations. It is the 
responsibility of the owner or operator of the facility to make sure 
that adequate amounts of sorbent materials are available.

5. Determining Response Resources Required for the Worst Case Discharge 
to the Maximum Extent Practicable

    5.5  The Coast Guard received one comment on this paragraph. This 
comment recommended that the paragraph be amended by adding language 
which restricts the definition of shallow water resources to vessels 
with a fully loaded draft of not more than six feet. The Coast Guard 
concludes that the response plan must demonstrate that sufficient 
resourses are available to operate in shallow water. It may be 
necessary to operate vessels at less than their fully loaded draft. In 
that event, it may be necessary for the response plan to identify 
additional resources due to vessels not being able to operate at their 
fully loaded draft. However, ideally only those vessels which can be 
utilized in a full range of loading conditions in waters of 6 feet or 
less depth should be listed for use in close-to-shore response 
activities (10% of those to be used in the offshore areas and 20% of 
those to be used in the nearshore inland, Great Lakes, and rivers and 
canals).
    5.6  The Coast Guard received one comment on this paragraph. The 
comment suggested that a more specific planning standard be adopted for 
determining the required length of boom in order to avoid wide 
variations in interpretation. The Coast Guard disagrees. Environmental 
conditions vary at each recovery site and each fish and wildlife and 
sensitive environment that must be protected. The Coast Guard contends 
that there is sufficient guidance, ``rules of thumb'', and practical 
experience to be used in determining the quantities of boom necessary 
to contain oil or provide protective booming for fish and wildlife and 
sensitive environments. In addition, ACPs address the strategies to 
protect these areas.

7. Calculating Worst Case Discharge Planning Volumes

    7.2.2  The Coast Guard received one comment on this paragraph. The 
comment addressed the requirement that facilities which handle, store, 
or transport oils from different petroleum groups assume, for planning 
purposes, that the oil groups resulting in the largest on-water 
recovery volume will be stored in the tank or tanks identified as 
constituting the worst case discharge. The comment recommended that the 
oil groups resulting in the largest on-water recovery volume should 
apply only if the largest tank does, in fact, store the largest oil 
volume. The comment stated that if the product changed in a way that 
required more planning then the plan could be amended accordingly at 
that time. The marine transportation-related (MTR) facility pertains to 
the piping that conveys the oils between the vessel and the non-
transportation-related storage tanks. The MTR facility does not 
generally include the storage tanks and therefore the comment applies 
to the non-transportation related portion which is regulated by the 
EPA, not the Coast Guard. The EPA has addressed this comment in their 
final rule issued on July 1, 1994 (59 FR 34071).

8. Determining the Availability of Alternative Response Methods

    8.6  The Coast Guard received one comment on this paragraph. The 
comment encouraged the Coast Guard to credit a portion of the required 
on-water recovery capacity for in-situ burning similar to the credit 
allowed for dispersants. The comment asserted that in-situ burning is 
most effective early in a spill response and in order to use it as 
early as possible authority to use in-situ burning must be authorized 
ahead of time. The Coast Guard will not permit an owner or operator of 
a facility to use in-situ burning as a planning response strategy in 
the final rule. The use of in-situ burning is still being studied. As 
the effectiveness and environmental effects of non-mechanical methods 
of pollution recovery are studied, they may be included as alternate 
response strategies. The Coast Guard will evaluate in-situ burning as a 
permissible response strategy for capability increases in 1998.

9. Additional Equipment Necessary to Sustain Response Operations

    9.1  The Coast Guard received 1 comment on this paragraph. The 
comment expressed concern that the language of the IFR regarding 
additional equipment and personnel allows for varying interpretations. 
It recommended adoption of a planning standard using a ``systems'' 
approach to clarify the final rule. The Coast Guard agrees and 
concludes that the section reflects a ``systems'' approach to spill 
response. The equipment must be suitable for use with the primary 
equipment identified in the response plan. Section 2.4 of appendix C 
and Sec. 154.1045 require that equipment must be capable of operating 
in the applicable operating environment.
    9.2  The Coast Guard received 1 comment on this paragraph. The 
comment recommended using a 10-hour operating day in determining the 
level of adequate temporary storage capacity. The comment also asked 
for guidance from the Coast Guard in determining the time needed for 
transferring recovered oil to a temporary storage facility. The 
suggested guidance included pumping capacity, number of oil discharge 
stations, and any other pertinent factors. The Coast Guard disagrees 
and determines that the storage capacity should be based on the types 
and quantities of oil recovery identified in the plan. Pump capacities 
are variable and discharge stations are dependent on local factors. The 
owner or operator is 

[[Page 7915]]
best equipped to estimate and certify the availability of these 
resources.

Appendix C of Part 154. Tables 1-5

Table 1  Response Resource Operating Criteria

    The Coast Guard received two comments stating that Tables 1, 2 and 
3 are oversimplified because they do not take into account variables 
such as temperature and flow rate, which the comments claim affect 
dissipation and emulsification rates. Another comment recommended 
referencing the factors used to calculate the figures in the tables. 
That comment asked for clarification because it stated that the 3-day 
quick mobilization mentioned in the explanatory note is incompatible 
with the 3, 4, or 6-day sustainability requirements in Table 2. The 
comment also claimed that the 3-day quick mobilization is inconsistent 
with the tiering of response equipment which is required to be on-scene 
within 60 hours.
    The Coast Guard disagrees with these comments. Table 1 is based on 
information for equipment selection in the 1991 World Catalog of Oil 
Spill Response Products [Schulze, Robert, ed., 1991]. The American 
Society of Testing and Material (ASTM) used this resource as the 
starting point for its oil recovery equipment standard. The values in 
Table 2 were drawn from the deliberations among the Negotiated 
Rulemaking Committee. They are based on the general behavior of oil 
that has been observed during actual discharges. The variances in 
values reflect the amount of oil most likely to be available for 
recovery.
    The three days referred to by the comment appears in the preamble 
to the IFR. This reflects a desire for the planned mobilization of 
response resources within the first 3 days of the response. It should 
not be confused with the equipment sustainability listed in Table 2.

Table 2  Removal Capacity Planning Table

    The Coast Guard received one comment remarking that the values in 
Table 2 should not total over 100 percent. As was explained in the IFR, 
the Coast Guard recognizes that the percentages exceed 100 percent in 
the inland, nearshore, Great Lakes, and offshore areas. This reflects a 
desire to increase the quantity of response that are planned for 
mobilization within the first 3 days of a response.

Table 3  Emulsification Factors for Petroleum Oil Groups

    The Coast Guard received four comments on Table 3. One comment 
asserted that the entire amount of oil spilled will not emulsify 
because emulsification occurs over time, and therefore, the IFR's rapid 
spill response requirements will not allow the impact to be as 
extensive as suggested. The comment stated that emulsification factors 
are only appropriate for open ocean spills from vessels; and that the 
factors should not apply to the total worst case discharge in river/
nearshore areas. The comment also recommended that the regulations not 
use emulsification factors at all. Another comment pointed out that 
emulsification is already accounted for in the derating of recovery 
devices in paragraph 6.2 of appendix C. Two comments stated that Table 
3 is overly simple because it does not take into account other 
variables which affect emulsification such as flow rate and 
temperature. One comment recommended that the emulsification factor for 
Group III oil should be changed to 3.0 to better reflect the level of 
Alaskan crude oil.
    Emulsification factors vary considerably within an oil group and 
are dependent on many factors, such as temperature and weather 
conditions. The proposed Table 3 values were derived from ITOPF data 
and reflected the maximum amount of emulsification that could occur 
over a prolonged period of time in environmental conditions that favor 
the emulsification process. No other factors were proposed. The Coast 
Guard does not require that the entire amount of oil be emulsified. 
Rather the oil to be emulsified depends on the percentage of recovered 
floating oil taken from Table 2.
    The Coast Guard disagrees with the comment that the emulsification 
is accounted for in the derating of recovery devices. The 
emulsification factors listed in Table 3 are to account for actual 
emulsification that occurs to the oils prior to being encountered by 
the skimming equipment. The derating factor included, among other 
things, consideration of the actual skimming device to remove oily 
material from water, the two issues are unrelated.
    The emulsification factors in this final rule are the same as those 
in the VRP IFR. The factors in the VRP IFR were revised from the 
factors in the VRP NPRM. The factors were revised down because the 
Coast Guard was convinced that the original factors were too high.

Table 5  Response Capability Caps by Operating Area

    The Coast Guard received one comment on Table 5. The comment 
suggested that the 1998 caps be changed to ``To Be Determined'' because 
practical experience may demonstrate that the 1993 values may not need 
to be increased. The Coast Guard disagrees. The caps provided in Table 
5 reflect a 25 percent increase in response resources from 1993 to 
1998. Prior to these caps becoming effective, the Coast Guard will 
initiate a review of the cap increases. This review will determine if 
the scheduled increases for 1998 remain practicable and will also 
establish a specific cap for 2003.

Appendix D of Part 154. Interim Guidelines for Determining Economically 
Important and Environmentally Sensitive Areas for Facility Response 
Plans

    The Coast Guard received 12 comments to Appendix D--Guidelines for 
Determining Economically Important and Environmentally Sensitive Areas 
for Facility Response Plans. The Coast Guard reviewed the comments and 
provided them to the National Oceanic and Atmospheric Administration 
(NOAA). NOAA used the comments in drafting its Federal Register notice 
entitled ``Guidance for Facility and Vessel Response Plans Fish and 
Wildlife and Sensitive Environments.''
    The Coast Guard has adopted EPA's terminology in this final rule 
and therefore the term ``Environmentally Sensitive Areas'' has been 
changed to ``Fish and Wildlife and Sensitive Environments.'' The Coast 
Guard determined that Appendix D on sensitive areas is unnecessary 
because fish and wildlife and sensitive environments are identified in 
the Area Contingency Plans (ACPs) and all coastal ACPs are now 
complete. Since the ACPs identify fish and wildlife and sensitive 
environments for each area, there is no longer a need for the Coast 
Guard to provide the guidance that was contained in appendix D to the 
IFR. Therefore, the Coast Guard has removed appendix D on sensitive 
areas from the final rule and has replaced it with a new Appendix D 
entitled ``Training Elements for Oil Spill Response Plans.''

Appendix D to Part 154--Training Elements for Oil Spill Response Plans

    This appendix was added to the final rule to provide guidelines to 
facility owners and operators for the development of the training 
portions of their response plans. These guidelines were developed in 
the same manner as PREP, which is addressed in the preamble discussion 
on the revisions to Sec. 154.1055.

Assessment

    This final rule is a significant regulatory action under section 
3(f) of 

[[Page 7916]]
Executive Order 12866 and has been reviewed by the Office of Management 
and Budget (OMB) under that order. It requires an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It is 
significant under the regulatory policies and procedures of the 
Department of Transportation (44 FR 11040, February 26, 1979). An 
Assessment has been prepared and is available in the docket for 
inspection or copying where indicated under ADDRESSES. Seven public 
comments addressed the Regulatory Evaluation section of the IFR. The 
comments are discussed in the appropriate section of this discussion.

1. Facility Response Plan Costs and Benefits

    In the aggregate, the requirement for facility response plans will 
result in substantial costs to the facilities affected. If all the 
costs for MTR facilities affected by this rule are attributed to the 
Coast Guard's regulations, the present value cost of this regulation 
for the first 10 years is estimated at $305.9 million. In the first 
year, most of this cost is attributable to conducting training and 
exercise evaluations and arranging for or providing adequate response 
capability. In subsequent years, the majority of the cost is 
attributable to conducting exercising and retaining the response 
capability. The incremental cost of the entire regulation was $63 
million for 1992, but declined to $40 million annually in subsequent 
years. However, since many of these facilities are complexes which are 
being jointly regulated by the Coast Guard and the EPA and the total 
costs are already accounted for under EPA's facility response plan 
regulation (59 FR 34097, July 1, 1994), these costs could be reduced to 
reflect this fact. Thus, total present value costs for Coast Guard 
facility response plans will be $90 million and incremental costs will 
be $18.7 million for the first full year and $11.9 million for 
subsequent years.
    Four comments argued that the costs of this regulation are 
excessive and have not been thoroughly examined in the IFR. The Coast 
Guard disagrees with these comments. The Coast Guard has reexamined its 
cost data and concludes that costs are not excessive. Two comments 
argued that the $25,000 cost estimate for large facilities is much too 
low and does not take into consideration expenditures such as equipment 
purchases, costs of training, costs of exercises, and retainer fees. 
With regard to exercises, two comments argued that the costs would be 
prohibitive. The Coast Guard disagrees with these comments. The 
Regulatory Impact Analysis did take into consideration equipment 
purchases, costs of training, costs of exercises, and retainer fees. 
Facility owners or operators are already required to comply with 
existing pollution regulations which require them to prepare operations 
manuals and Spill Prevention Control and Countermeasures (SPCC) plans 
that address some elements of the facility response plan regulations. 
The Coast Guard assumed in its analysis that facility owners or 
operators would not be redundant when complying with requirements. The 
Coast Guard's analysis indicated that the requirements set forth are 
the most practical and least burdensome which give acceptable levels of 
planning for spill response.
    The benefit analysis indicates an incremental volume of 230,848 
discounted barrels of spilled oil (using a 7 percent discount rate) 
that will be recovered due to compliance with this regulation. The cost 
effectiveness ratio (costs divided by benefits) is $1,325 per barrel of 
oil recovered.
    A Regulatory Impact Analysis (RIA) is available in the docket for 
inspection or copying, as indicated under ADDRESSES. The RIA prepared 
for the IFR was reviewed based upon comments received and no changes 
made in the final rule caused a great enough impact on costs to require 
redrafting the RIA. It has also been placed in a separate docket (CGD 
91-047) established to facilitate review of the programmatic RIA for 
titles IV and V of OPA 90.
    One comment expressed concern that the RIA for the final rule would 
be different from the RIA on which the IFR was based and that an 
opportunity for comment would not be permitted before the rule would be 
finalized. While the costs and benefits in the RIA have changed from 
the IFR to the final rule, the change is the result of lowering the 
discount rate from 10 to 7 percent, reflecting a change in OMB guidance 
between publication of the IFR and publication of the final rule.

2. Additional Response Plans Requirements for Trans-Alaska Pipeline 
Authorization Act (TAPAA) Facilities Operating in Prince William Sound, 
Alaska

    At present, there is only one Trans-Alaska Pipeline (TAPAA) 
facility operating in Prince William Sound. This facility is the Valdez 
Marine Terminal which is operated by Alyeska Pipeline Service Company. 
This facility transfers approximately 700 million barrels annually to 
approximately 900 tank vessels.
    The increase in unit cost of handling, storing, and transporting 
crude oil to comply with section 5005 of OPA 90 is relatively small. 
This can easily be absorbed by the Alyeska Pipeline Service Company.
    Overall industry costs for complying with additional response 
planning requirements were previously discussed in the Draft Regulatory 
Evaluation for Prince William sound, Alaska referenced in the VRP NPRM 
published in the Federal Register on June 19, 1992 (57 FR 27514). While 
this specifically addressed requirements for certain vessels in Prince 
William Sound, Alaska, it also included the costs and benefits incurred 
by the sole TAPAA facility located in Prince William Sound. The costs 
of complying with section 5005 of OPA 90 are estimated to be $232 
million for the 10-year period, 1993 through 2002. The benefits include 
the quick recovery of spilled oil from the environment and subsequent 
reduction in net impact of the spill. The regulations for Prince 
William Sound are estimated to increase the volume of recovered oil by 
25 percent for crude oil.
    A copy of the Assessment for Prince William Sound is available in 
the docket for inspection or copying, as indicated under ``ADDRESSES.''

Small Entities

    The Coast Guard has examined the impact of this rule on small 
entities. Its analysis indicates that the majority of small businesses 
subject to this regulation should be able to absorb the estimated 
compliance costs without experiencing significant adverse economic 
effects. Therefore, the Coast Guard certifies under section 605(b) of 
the Regulatory Flexibility Act (5 U.S.C. 601 et seq.) that this rule 
will not have a significant economic impact on a substantial number of 
small entities.
    The Coast Guard received one comment to the IFR concerning the 
impact of the Facility Response Plan regulation on small businesses. 
The comment argued that smaller operators may not have the resources to 
comply with regulations as the Coast Guard has envisioned. The Coast 
Guard disagrees. The regulation may have a significant impact on a very 
few small facility operators. The impact on small entities of the 
changes in this final rule are not substantial.

Collection of Information

    This rule contains collection-of-information requirements. The 
Coast Guard previously submitted the requirements to the Office of 
Management and Budget (OMB) for 

[[Page 7917]]
review under section 3504(h) of the Paperwork Reduction Act (44 U.S.C. 
3501 et seq.) and OMB approved them. The Coast Guard has submitted 
revised requirements to OMB for renewed approval under the current OMB 
Control Number 2115-0595. For subpart F, the section numbers are 
Secs. 154.1025, 154.1030, 154.1050, 154.1055, 154.1060, and 154.1065, 
and the corresponding OMB approval number is OMB Control Number 2115-
0595. For subpart G, the section numbers are Secs. 154.1120 and 
154.1125, and the corresponding OMB approval number is OMB Control 
Number 2115-0595. Subparts H and I refer to subpart F for all 
collection-of-information requirements. Accordingly, additional OMB 
approval is not needed.
    The Coast Guard received one comment responding to this portion of 
the IFR, which contended that the estimated recordkeeping burden of 4.5 
hours annually is much too low. The Coast Guard disagrees. The Coast 
Guard has reexamined its recordkeeping analysis and has concluded that 
its estimate is accurate.

Federalism

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612 (October 26, 1987) and has 
determined that this rule does not have sufficient federalism 
implications to warrant the preparation of a Federalism Assessment.
    Executive Order 12612 and the FWPCA emphasize the President's and 
Congress' intent to preserve state authority to address matters of 
pollution prevention and response. Executive Order 12612 directs a 
Federal executive branch agency (which includes the Coast Guard) to 
encourage states to develop their own policies to achieve program 
objectives. Consequently, a Federalism Assessment would be necessary 
only if the facility response plan rule unduly impinged on a state's 
authority to establish its own regulatory structure, or imposed undue 
costs on a state.
    The FWPCA provides convincing evidence of Congress' intent that, 
within 3 miles of shore, the protection of the marine environment 
should be a collaborative Federal and state effort. Chevron v. 
Governor, State of Alaska, 726 F.2d 483 (9th Cir. 1984), cert. denied, 
471 U.S. 1140 (1985). For example, section 402 of the FWPCA (33 U.S.C. 
1342) establishes the National Pollutant Discharge Elimination System, 
a regulatory program for regulating the discharge of pollutants into 
U.S. navigable waters. Minimum Federal standards apply to the discharge 
of certain pollutants, but the States have authority to establish and 
administer their own permit systems and to set standards stricter than 
the Federal ones (33 U.S.C. 1342(b) and 1370). Further, in the 
Declaration of Goals and Policy contained in section 101 of the FWPCA 
(33 U.S.C. 1251), Congress states that it is the policy of the Congress 
to recognize, preserve, and protect the primary responsibilities and 
rights of States to prevent, reduce, and eliminate pollution of land 
and water resources.
    United States courts have long recognized the rights of States to 
make both U.S.-flag and foreign-flag vessels conform to ``reasonable, 
nondiscriminatory conservation and environmental protection measures * 
* * imposed by a State.'' Ray v. Atlantic Richfield, 435 U.S. 151, 164 
(1973). Also section 311(o)(3) of the FWPCA (33 U.S.C. 1321(o)(3)) 
contains express nonpreemption language. Therefore, a State standard 
setting more stringent planning requirements for facilities owners and 
operators in the regulating State's water is encouraged under the FWPCA 
and in valid as long as the State requirement does not preclude 
compliance with the Federal requirements. Similarly, if a State chose 
to establish performance requirements for response to an oil spill, the 
Federal facility response plan rules would not preclude that option. 
The Federal facility response plan rules preempt State rules only to 
the extent that State rules may make it impossible to comply with 
Federal requirements. Florida Lime and Avocado Growers v. Paul, 373 
U.S. 132 (1963).

Environment

    The Coast Guard considered the environmental impact of this final 
rule and prepared an Environmental Assessment (EA) under section 311(j) 
of the FWPCA (33 U.S.C. 1321(j)), and a separate EA for Prince William 
Sound under section 5005 of OPA 90. These documents were prepared in 
accordance with the Council on Environmental Quality regulations (40 
CFR parts 1500-1508) and Commandant Instruction M16475.1B implementing 
the provisions of the National Environmental Policy Act (NEPA).
    The EA prepared for section 311(j) requirements was amended when 
section 5209(b) of the Coast Guard Authorization Act of 1992 (Pub. L. 
102-587) declared offshore supply vessels and certain fishing vessels 
not to be ``tank vessels'' for purposes of implementing the VRP rule. 
The Prince William Sound EA was entirely revised when section 352 of 
the Department of Transportation Appropriations Act effectively made 
section 5005 of OPA 90 inapplicable to non-TAPS-trade vessels. The 
original language of section 5005 created special response plan 
provisions applicable to all tank vessels operating in Prince Williams 
Sound, including non-TAPS vessels. The Coast Guard received no comments 
on the EAs.
    The Coast Guard has identified and studies the relevant 
environmental issues and alternatives, and based on its assessment, 
does not expect this final rule to result in a significant impact on 
the quality of the human environment. Therefore, Findings of No 
Significant Impact (FONSIs) have been prepared. The revised and amended 
EAs and the FONSIs are available in the public docket where indicated 
under ADDRESSES.

List of Subjects

33 CFR Part 150

    Harbors, Marine safety, Navigation (water), Occupational safety and 
health, Oil pollution, Reporting and recordkeeping requirements.

33 CFR 154

    Fire prevention, Oil pollution, Hazardous substances, Incorporation 
by reference, Reporting and recordkeeping requirements.

    For the reasons set out in the preamble, the interim rule amending 
33 CFR parts 150 and 154 which was published at 58 FR 7330 on February 
5, 1993, is adopted as final except for changes to part 154 which are 
set forth below:

PART 154--FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK

    1. The authority citation for part 154 continues to read as 
follows:

    Authority: 33 U.S.C. 1231, 1321 (j)(1)(C), (j)(5), (j)(6) and 
(m)(2); sec. 2, E.O. 12777, 56 FR 54757; 49 CFR 1.46. Subpart F is 
also issued under 33 U.S.C. 2735.

    2. Subpart F of part 154 is revised to read as follows:

Subpart F--Response Plans for Oil Facilities

Sec.
154.1010  Purpose.
154.1015  Applicability.
154.1016  Facility Classification by COTP.
154.1017  Response plan submission requirements.
154.1020  Definitions.
154.1025  Operating restrictions and interim operating 
authorization.
154.1026  Qualified individual and alternate qualified individual.
154.1028  Methods of ensuring the availability of response resources 
by contract or other approved means.
154.1029  Worst case discharge.

[[Page 7918]]

154.1030  General response plan contents.
154.1035  Specific requirements for facilities that could reasonably 
be expected to cause significant and substantial harm to the 
environment.
154.1040  Specific requirements for facilities that could reasonably 
be expected to cause substantial harm to the environment.
154.1041  Specific response information to be maintained on mobile 
MTR facilities.
154.1045  Response plan development and evaluation criteria for 
facilities that handle, store, or transport Group I through Group IV 
petroleum oils.
154.1047  Response plan development and evaluation criteria for 
facilities that handle, store, or transport Group V petroleum oils.
154.1050  Training.
154.1055  Exercises.
154.1057  Inspection and maintenance of response resources.
154.1060  Submission and approval procedures.
154.1065  Plan review and revision procedures.
154.1070  Deficiencies.
154.1075  Appeal process.

Subpart F--Response Plans for Oil Facilities

Sec. 154.1010  Purpose.

    This subpart establishes oil spill response plan requirements for 
all marine transportation-related (MTR) facilities (hereafter also 
referred to as facilities) that could reasonably be expected to cause 
substantial harm or significant and substantial harm to the environment 
by discharing oil into or on the navigable waters, adjoining 
shorelines, or exclusive economic zone. The development of a response 
plan prepares the facility owner or operator to respond to an oil 
spill. These requirements specify criteria to be used during the 
planning process to determine the appropriate response resources. The 
specific criteria for response resources and their arrival times are 
not performance standards. The criteria are based on a set of 
assumptions that may not exist during an actual oil spill incident.

Sec. 154.1015  Applicability.

    (a) This subpart applies to all MTR facilities that because of 
their location could reasonably be expected to cause at least 
substantial harm to the environment by discharging oil into or on the 
navigable waters, adjoining shorelines, or exclusive economic zone.
    (b) The following MTR facilities that handle, store, or transport 
oil, in bulk, could reasonably be expected to cause substantial harm to 
the environment by discharging oil into or on the navigable waters or 
adjoining shorelines and are classified as substantial harm MTR 
facilities:
    (1) Fixed MTR onshore facilities capable of transferring oil to or 
from a vessel with a capacity of 250 barrels or more and deepwater 
ports;
    (2) Mobile MTR facilities used or intended to be used to transfer 
oil to or from a vessel with a capacity of 250 barrels or more; and
    (3) Those MTR facilities specifically designated as substantial 
harm facilities by the COTP under Sec. 154.1016.
    (c) The following MTR facilities that handle, store, or transport 
oil in bulk could not only reasonably be expected to cause substantial 
harm, but also significant and substantial harm, to the environment by 
discharging oil into or on the navigable waters, adjoining shorelines, 
or exclusive economic zone and are classified as significant and 
substantial harm MTR facilities:
    (1) Deepwater ports, and fixed MTR onshore facilities capable of 
transferring oil to or from a vessel with a capacity of 250 barrels or 
more except for facilities that are part of a non-transportation-
related fixed onshore facility with a storage capacity of less than 
42,000 gallons; and
    (2) Those MTR facilities specifically designated as significant and 
substantial harm facilities by the COTP under Sec. 154.1016.
    (d) An MTR facility owner or operator who believes the facility is 
improperly classified may request review and reclassification in 
accordance with Sec. 154.1075.

Sec. 154.1016  Facility classification by COTP.

    (a) The COTP may upgrade the classification of:
    (1) An MTR facility not specified in Sec. 154.1015 (b) or (c) to a 
facility that could reasonably be expected to cause substantial harm to 
the environment; or
    (2) An MTR facility specified in Sec. 154.1015(b) to a facility 
that could reasonably be expected to cause significant and substantial 
harm to the environment.
    (b) The COTP may downgrade, the classification of:
    (1) An MTR facility specified in Sec. 154.1015(c) to a facility 
that could reasonably be expected to cause substantial harm to the 
environment; or
    (2) An MTR facility specified in Sec. 154.1015(b) to a facility 
that could not reasonably be expected to cause substantial, or 
significant and substantial harm to the environment.
    (3) The COTP will consider downgrading an MTR facility's 
classification only upon receiving a written request for a downgrade of 
classification from the facility's owner or operator.
    (c) When changing a facility classification the COTP may, as 
appropriate, consider all relevant factors including, but not limited 
to: Type and quantity of oils handled in bulk; facility spill history; 
age of facility; proximity to public and commercial water supply 
intakes; proximity to navigable waters based on the definition of 
navigable waters in 33 CFR 2.05-25; and proximity to fish and wildlife 
and sensitive environments.

154.1017  Response plan submission requirements.

    (a) The owner or operator of an MTR facility identified only in 
Sec. 154.1015(b), or designated by the COTP as a substantial harm 
facility, shall prepare and submit to the cognizant COTP a response 
plan that meets the requirements of Secs. 154.1030, 154.1040, 154.1045, 
or Sec. 154.1047, as appropriate. This applies to:
    (1) A mobile MTR facility used or intended to be used to transfer 
oil to or from a vessel with a capacity of 250 barrels or more; and
    (2) A fixed MTR facility specifically designated as a substantial 
harm facility by the COTP under Sec. 154.1016.
    (b) The owner or operator of an MTR facility identified in 
Sec. 154.1015(c) or designated by the COTP as a significant and 
substantial harm facility shall prepare and submit for review and 
approval of the cognizant COTP a response plan that meets the 
requirements of Secs. 154.1030, 154.1035, 154.1045, or 154.1047, as 
appropriate. This applies to:
    (1) A fixed MTR facility capable of transferring oil, in bulk, to 
or from a vessel with a capacity of 250 barrels or more; and
    (2) An MTR facility specifically designated as a significant and 
substantial harm facility by the COTP under Sec. 154.1016.
    (c) In addition to the requirements in paragraphs (a) and (b) of 
this section, the response plan for a mobile MTR facility must meet the 
requirements of Sec. 154.1041 subpart F.

Sec. 154.1020  Definition.

    Except as otherwise defined in this section, the definition in 33 
CFR 154.105 apply to this subpart and subparts H and I.
    Adverse weather means the weather conditions that will be 
considered when identifying response systems and equipment in a 
response plan for the applicable operating environment. Factors to 
consider include, but are not limited to, significant wave height as 
specified in Secs. 154.1045, 154.1047, 154.1225, or 154.1325, as 
appropriate; 

[[Page 7919]]
ice conditions, temperatures, weather-related visibility, and currents 
within the COTP zone in which the systems or equipment are intended to 
function.
    Animal fat means a non-petroleum oil, fat, or grease derived from 
animals, and not specifically identified elsewhere in this part.
    Average most probable discharge means a discharge of the lesser of 
50 barrels or 1 percent of the volume of the worst case discharge.
    Captain of the Port (COTP) Zone means a zone specified in 33 CFR 
part 3 and, where applicable, the seaward extension of that zone to the 
outer boundary of the exclusive economic zone (EEZ).
    Complex means a facility possessing a combination of marine-
transportation related and non-transportation-related components that 
is subject to the jurisdiction of more than one Federal agency under 
section 311(j) of the Clean Water Act.
    Exclusive economic zone (EEZ) means the zone contiguous to the 
territorial sea of the United States extending to a distance up to 200 
nautical miles from the baseline from which the breadth of the 
territorial sea is measured.
    Facility that could reasonably be expected to cause significant and 
substantial harm means any MTR facility (including piping and any 
structures that are used for the transfer of oil between a vessel and a 
facility) classified as a ``significant and substantial harm'' facility 
under Sec. 154.1015(c) including a facility specifically designated by 
the COTP under Sec. 154.1016(a).
    Facility that could reasonably be expected to cause substantial 
harm means any MTR facility classified as a ``substantial harm'' 
facility under Sec. 154.1015(b) including a facility specifically 
designated by the COTP under Sec. 154.1016(a).
    Fish and Wildlife and Sensitive Environment means areas that may be 
identified by either their legal designation or by Area Committees in 
the applicable Area Contingency Plan (ACP) (for planning) or by members 
of the Federal On-Scene Coordinator's spill response structure (during 
responses). These areas may include: Wetlands, national and state 
parks, critical habitats for endangered or threatened species, 
wilderness and natural resource areas, marine sanctuaries and estuarine 
reserves, conservation areas, preserves, wildlife areas, wildlife 
refuges, wild and scenic rivers, areas of economic importance, 
recreational areas, national forests, Federal and state lands that are 
research areas, heritage program areas, land trust areas, and 
historical and archaeological sites and parks. These areas may also 
include unique habitats such as: aquaculture sites and agricultural 
surface water intakes, bird nesting areas, critical biological resource 
areas, designated migratory routes, and designated seasonal habitats.
    Great Lakes means Lakes Superior, Michigan, Huron, Erie, and 
Ontario, their connecting and tributary waters, the Saint Lawrence 
River as far as Saint Regis, and adjacent port areas.
    Higher volume port area means the following ports:
    (1) Boston, MA.
    (2) New York, NY.
    (3) Delaware Bay and River to Philadelphia, PA.
    (4) St. Croix, VI.
    (5) Pascagoula, MS.
    (6) Mississippi River from Southwest Pass, LA. to Baton Rouge, LA.
    (7) Louisiana Offshore Oil Port (LOOP), LA.
    (8) Lake Charles, LA.
    (9) Sabine-Neches River, TX.
    (10) Galveston Bay and Houston Ship Channel, TX.
    (11) Corpus Christi, TX.
    (12) Los Angeles/Long Beach harbor, CA.
    (13) San Francisco Bay, San Pablo Bay, Carquinez Strait, and Suisun 
Bay to Antioch, CA.
    (14) Straits of Juan De Fuca from Port Angeles, WA, to and 
including Puget Sound, WA.
    (15) Prince William Sound, AK.
    Inland area means the area shoreward of the boundary lines defined 
in 46 CFR part 7, except in the Gulf of Mexico. In the Gulf of Mexico, 
it means the area shoreward of the lines of demarcation (COLREG lines) 
defined in Secs. 80.740 through 80.850 of this chapter. The inland area 
does not include the Great Lakes.
    Marine transportation-related facility (MTR facility) means any 
onshore facility or segment of a complex regulated under section 311(j) 
of the Federal Water Pollution Control Act (FWPCA) by two or more 
Federal agencies, including piping and any structure used or intended 
to be used to transfer oil to or from a vessel, subject to regulation 
under this part and any deepwater port subject to regulation under part 
150 of this chapter. For a facility or segment of a complex regulated 
by two or more Federal agencies under section 311(j) of the FWPCA, the 
MTR portion of the complex extends from the facility oil transfer 
system's connection with the vessel to the first valve inside the 
secondary containment surrounding tanks in the non-transportation-
related portion of the facility or, in the absence of secondary 
containment, to the valve or manifold adjacent to the tanks comprising 
the non-transportation-related portion of the facility, unless another 
location has otherwise been agreed to by the COTP and the appropriate 
Federal official.
    Maximum extent practicable means the planned capability to respond 
to a worst case discharge in adverse weather, as contained in a 
response plan that meets the criteria in this subpart or in a specific 
plan approved by the cognizant COTP.
    Maximum most probable discharge means a discharge of the lesser of 
1,200 barrels or 10 percent of the volume of a worst case discharge.
    Nearshore area means the area extending seaward 12 miles from the 
boundary lines defined in 46 CFR part 7, except in the Gulf of Mexico. 
In the Gulf of Mexico, it means the area extending seaward 12 miles 
from the line of demarcation (COLREG lines) defined in Secs. 80.740-
80.850 of this chapter.
    Non-persistent or Group I oil means a petroleum-based oil that, at 
the time of shipment, consists of hydrocarbon fractio
FR Doc. 96-4274 Response Plans for Marine Transportation-Related Facilities
ns--
    (1) At least 50 percent of which by volume, distill at a 
temperature of 340 degrees C (645 degrees F); and
    (2) At least 95 percent of which by volume, distill at a 
temperature of 370 degrees C (700 degrees F).
    Ocean means the offshore area and nearshore area as defined in this 
subpart.
    Offshore area means the area beyond 12 nautical miles measured from 
the boundary lines defined in 46 CFR part 7 extending seaward to 50 
nautical miles, except in the Gulf of Mexico. In the Gulf of Mexico, it 
is the area beyond 12 nautical miles of the line of demarcation (COLREG 
lines) defined in Secs. 80.740-80.850 of this chapter extending seaward 
to 50 nautical miles.
    Oil means oil of any kind or in any form, including, but not 
limited to, petroleum, fuel oil, sludge, oil refuse, oil mixed with 
wastes other than dredge spoil.
    Oil spill removal organization (OSRO) means an entity that provides 
response resources.
    On-Scene Coordinator (OSC) means the definition in the National Oil 
and Hazardous Substances Pollution Contingency Plan (40 CFR part 300).
    Operating area means Rivers and Canals, Inland, Nearshore, Great 
Lakes, or Offshore geographic location(s) in which a facility is 
handling, storing, or transporting oil.

[[Page 7920]]

    Operating environment means Rivers and Canals, Inland, Great Lakes, 
or Ocean. These terms are used to define the conditions in which 
response equipment is designed to function.
    Operating in compliance with the plan means operating in compliance 
with the provisions of this subpart including, ensuring the 
availability of the response resources by contract or other approved 
means, and conducting the necessary training and drills.
    Other non-petroleum oil means a non-petroleum oil of any kind that 
is not generally an animal fat or vegetable oil.
    Persistent oil means a petroleum-based oil that does not meet the 
distillation criteria for a non-persistent oil. For the purposes of 
this subpart, persistent oils are further classified based on specific 
gravity as follows:
    (1) Group II--specific gravity of less than .85.
    (2) Group III--specific gravity equal to or greater than .85 and 
less than .95.
    (3) Group IV--specific gravity equal to or greater than .95 and 
less than or equal to 1.0.
    (4) Group V--specific gravity greater than 1.0.
    Qualified individual and alternate qualified individual means a 
person located in the United States who meets the requirements of 
Sec. 154.1026.
    Response activities means the containment and removal of oil from 
the land, water, and shorelines, the temporary storage and disposal of 
recovered oil, or the taking of other actions as necessary to minimize 
or mitigate damage to the public health or welfare or the environment.
    Response resources means the personnel, equipment, supplies, and 
other capability necessary to perform the response activities 
identified in a response plan.
    Rivers and canals means a body of water confined within the inland 
area, including the Intracoastal Waterways and other waterways 
artificially created for navigation, that has a project depth of 12 
feet or less.
    Specific gravity means the ratio of the mass of a given volume of 
liquid at 15 deg.C (60 deg.F) to the mass of an equal volume of pure 
water at the same temperature.
    Spill management team means the personnel identified to staff the 
organizational structure identified in a response plan to manage 
response plan implementation.
    Substantial threat of a discharge means any incident or condition 
involving a facility that may create a risk of discharge of oil. Such 
incidents include, but are not limited to storage tank or piping 
failures, above ground or underground leaks, fires, explosions, 
flooding, spills contained within the facility, or other similar 
occurrences.
    Tier means the combination of required response resources and the 
times within which the resources must arrive on scene.

    [Note: Tiers are applied in three categories:
    (1) Higher Volume Port Areas,
    (2) Great Lakes, and
    (3) All other operating environments, including rivers and 
canals, inland, nearshore, and offshore areas.
    Appendix C, Table 4 of this part, provides specific guidance on 
calculating response resources. Sections 154.1045(f) and 154.1135, 
set forth the required times within which the response resources 
must arrive on-scene.]

    Vegetable oil means a non-petroleum oil or fat derived from plant 
seeds, nuts, kernels or fruits, and not specifically identified 
elsewhere in this part.
    Worst case discharge means in the case of an onshore facility and 
deepwater port, the largest foreseeable discharge in adverse weather 
conditions meeting the requirements of Sec. 154.1029.

Sec. 154.1025  Operating restrictions and interim operating 
authorization.

    (a) The owner or operator of an MTR facility who submitted a 
response plan prior to May 29, 1996, may elect to comply with any of 
the provisions of this final rule by revising the appropriate section 
of the previously submitted plan in accordance with Sec. 154.1065. An 
owner or operator of an MTR facility who elects to comply with all 
sections of this final rule must resubmit the plan in accordance with 
Sec. 154.1060 of this part.
    (b) No facility subject to this subpart may handle, store, or 
transport oil unless it is operating in full compliance with a 
submitted response plan. No facility categorized under Sec. 154.1015(c) 
as a significant and substantial harm facility may handle, store, or 
transport oil unless the submitted response plan has been approved by 
the COTP. The owner or operator of each new facility to which this 
subpart applies must submit a response plan meeting the requirements 
listed in Sec. 154.1017 not less than 60 days prior to handling, 
storing, or transporting oil. Where applicable, the response plan shall 
be submitted along with the letter of intent required under 
Sec. 154.110.
    (c) Notwithstanding the requirements of paragraph (b) of this 
section, a facility categorized under Sec. 154.1015(c) as a significant 
and substantial harm facility may continue to handle, store, or 
transport oil for 2 years after the date of submission of a response 
plan, pending approval of that plan. To continue to handle, store, or 
transport oil without a plan approved by the COTP, the facility owner 
or operator shall certify in writing to the COTP that the owner or 
operator has ensured, by contract or other approved means as described 
in Sec. 154.1028(a), the availability of the necessary private 
personnel and equipment to respond, to the maximum extend practicable 
to a worst case discharge or substantial threat of such a discharge 
from the facility. Provided that the COTP is satisfied with the 
certification of response resources provided by the owner or operator 
of the facility, the COTP will provide written authorization for the 
facility to handle, store, or transport oil while the submitted 
response plan is being reviewed. Pending approval of the submitted 
response plan, deficiencies noted by the COTP must be corrected in 
accordance with Sec. 154.1070.
    (d) A facility may not continue to handle, store, or transport oil 
if--
    (1) The COTP determines that the response resources identified in 
the facility certification statement or reference response plan do not 
substantially meet the requirements of this subpart;
    (2) The contracts or agreements cited in the facility's 
certification statement or referenced response plans are no longer 
valid;
    (3) The facility is not operating in compliance with the submitted 
plan;
    (4) The response plan has not been resubmitted or approved within 
the last 5 years; or
    (5) The period of the authorization under paragraph (c) of this 
section has expired.

Sec. 154.1026  Qualified individual and alternate qualified individual.

    (a) The response plan must identify a qualified individual and at 
least one alternate who meet the requirements of this section. The 
qualified individual or alternate must be available on a 24-hour basis 
and be able to arrive at the facility in a reasonable time.
    (b) The qualified individual and alternate must:
    (1) Be located in the United States;
    (2) Speak fluent English;
    (3) Be familiar with the implementation of the facility response 
plan; and
    (4) Be trained in the responsibilities of the qualified individual 
under the response plan.
    (c) The owner or operator shall provide each qualified individual 
and alternate qualified individual identified in the plan with a 
document designating them as a qualified individual and specifying 
their full authority to:
    (1) Activate and engage in contracting with oil spill removal 
organization(s);

[[Page 7921]]

    (2) Act as a liaison with the predesignated Federal On-Scene 
Coordinator (OSC); and
    (3) Obligate funds required to carry out response activities.
    (d) The owner or operator of a facility may designate an 
organization to fulfill the role of the qualified individual and the 
alternate qualified individual. The organization must then identify a 
qualified individual and at least one alternate qualified individual 
who meet the requirements of this section. The facility owner or 
operator is required to list in the response plan the organization, the 
person identified as the qualified individual, and the person or 
person(s) identified as the alternate qualified individual(s).
    (e) The qualified individual is not responsible for--
    (1) The adequacy of response plans prepared by the owner or 
operator; or
    (2) Contracting or obligating funds for response resources beyond 
the authority contained in their designation from the owner or operator 
of the facility.
    (f) The liability of a qualified individual is considered to be in 
accordance with the provisions of 33 USC 1321(c)(4).

Sec. 154.1028  Methods of ensuring the availability of response 
resources by contract or other approved means.

    (a) When required in this subpart, the availability of response 
resources must be ensured by the following methods:
    (1) A written contractual agreement with an oil spill removal 
organization. The agreement must identify and ensure the availability 
of specified personnel and equipment required under this subpart within 
stipulated response times in the specified geographic areas;
    (2) Certification by the facility owner or operator that specified 
personnel and equipment required under this subpart are owned, 
operated, or under the direct control of the facility owner or 
operator, and are available within stipulated response times in the 
specified geographic areas;
    (3) Active membership in a local or regional oil spill removal 
organization that has identified specified personnel and equipment 
required under this subpart that are available to respond to a 
discharge within stipulated response times in the specified geographic 
areas;
    (4) A document which--
    (i) Identifies the personnel, equipment, and services capable of 
being provided by the oil spill removal organization within stipulated 
response times in the specified geographic areas;
    (ii) Sets out the parties' acknowledgment that the oil spill 
removal organization intends to commit the resources in the event of a 
response;
    (iii) Permits the Coast Guard to verify the availability of the 
identified response resources through tests, inspections, and drills; 
and
    (iv) Is referenced in the response plan; or
    (5) The identification of an oil spill removal organization with 
specified equipment and personnel available within stipulated response 
times in specified geographic areas. The organization must provide 
written consent to being identified in the plan.
    (b) The contracts and documents required in paragraph (a) of this 
section must be retained at the facility and must be produced for 
review upon request by the COTP.

Sec. 154.1029  Worst case discharge.

    (a) The response plan must use the appropriate criteria in this 
section to develop the worst case discharge.
    (b) For the MTR segment of a facility, not less than--
    (1) Where applicable, the loss of the entire capacity of all in-
line and break out tank(s) needed for the continuous operation of the 
pipelines used for the purposes of handling or transporting oil, in 
bulk, to or from a vessel regardless of the presence of secondary 
containment; plus
    (2) The discharge from all piping carrying oil between the marine 
transfer manifold and the non-transportation-related portion of the 
facility. The discharge from each pipe is calculated as follows: The 
maximum time to discover the release from the pipe in hours, plus the 
maximum time to shut down flow from the pipe in hours (based on 
historic discharge data or the best estimate in the absence of historic 
discharge data for the facility) multiplied by the maximum flow rate 
expressed in barrels per hour (based on the maximum relief valve 
setting or maximum system pressure when relief valves are not provided) 
plus the total line drainage volume expressed in barrels for the pipe 
between the marine manifold and the non-transportation-related portion 
of the facility; and
    (c) For a mobile facility it means the loss of the entire contents 
of the container in which the oil is stored or transported.

Sec. 154.1030  General response plan contents.

    (a) The plan must be written in English.
    (b) A response plan must be divided into the sections listed in 
this paragraph and formatted in the order specified herein unless noted 
otherwise. It must also have some easily found marker identifying each 
section listed below. The following are the sections and subsections of 
a facility response plan:
    (1) Introduction and plan contents.
    (2) Emergency response action plan:
    (i) Notification procedures.
    (ii) Facility's spill mitigation procedures.
    (iii) Facility's response activities.
    (iv) Fish and wildlife and sensitive environments.
    (v) Disposal plan.
    (3) Training and Exercises:
    (i) Training procedures.
    (ii) Exercise procedures.
    (4) Plan review and update procedures.
    (5) Appendices.
    (i) Facility-specific information.
    (ii) List of contacts.
    (iii) Equipment lists and records.
    (iv) Communications plan.
    (v) Site-specific safety and health plan.
    (vi) List of acronyms and definitions.
    (vii) A geographic-specific appendix for each zone in which a 
mobile facility operates.
    (c) The required contents for each section and subsection of the 
plan are contained in Secs. 154.1035, 154.1040, and 154.1041, as 
appropriate.
    (d) The sections and subsections of response plans submitted to the 
COTP must contain at a minimum all the information required in 
Secs. 154.1035, 154.1040, and 154.1041, as appropriate. It may contain 
other appropriate sections, subsections, or information that are 
required by other Federal, State, and local agencies.
    (e) For initial and subsequent submission, a plan that does not 
follow the format specified in paragraph (b) of this section must be 
supplemented with a detailed cross-reference section to identify the 
location of the applicable sections required by this subpart.
    (f) The information contained in a response plan must be consistent 
with the National Oil and Hazardous Substances Pollution Contingency 
Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) 
covering the area in which the facility operates. Facility owners or 
operators shall ensure that their response plans are in accordance with 
the ACP in effect 6 months prior to initial plan submission or the 
annual plan review required under Sec. 154.1065(a). Facility owners or 
operators are not required to, but may at their option, conform to an 
ACP which is less than 6 months old at the time of plan submission.

[[Page 7922]]

Sec. 154.1035  Specific requirements for facilities that could 
reasonably be expected to cause significant and substantial harm to the 
environment.

    (a) Introduction and plan content. This section of the plan must 
include facility and plan information as follows:
    (1) The facility's name, street address, city, county, state, ZIP 
code, facility telephone number, and telefacsimile number, if so 
equipped. Include mailing address if different from street address.
    (2) The facility's location described in a manner that could aid 
both a reviewer and a responder in locating the specific facility 
covered by the plan, such as, river mile or location from a known 
landmark that would appear on a map or chart.
    (3) The name, address, and procedures for contacting the facility's 
owner or operator on a 24-hour basis.
    (4) A table of contents.
    (5) During the period that the submitted plan does not have to 
conform to the format contained in this subpart, a cross index, if 
appropriate.
    (6) A record of change(s) to record information on plan updates.
    (b) Emergency Response Action Plan. This section of the plan must 
be organized in the subsections described in this paragraph:
    (1) Notification procedures. (i) This subsection must contain a 
prioritized list identifying the person(s), including name, telephone 
number, and their role in the plan, to be notified of a discharge or 
substantial threat of a discharge of oil. The telephone number need not 
be provided if it is listed separately in the list of contacts required 
in the plan. This Notification Procedures listing must include--
    (A) Facility response personnel, the spill management team, oil 
spill removal organizations, and the qualified individual(s) and the 
designated alternate(s); and
    (B) Federal, State, or local agencies, as required.
    (ii) This subsection must include a form, such as that depicted in 
Figure 1, which contains information to be provided in the initial and 
follow-up notifications to Federal, State, and local agencies. The form 
shall include notification of the National Response Center as required 
in part 153 of this chapter. Copies of the form also must be placed at 
the location(s) from which notification may be made. The initial 
notification form must include space for the information contained in 
Figure 1. The form must contain a prominent statement that initial 
notification must not be delayed pending collection of all information.

                  Figure 1.--Information on discharge *                 
                           [Involved Parties]                           
------------------------------------------------------------------------
        (A) Reporting party            (B) Suspected responsible party  
------------------------------------------------------------------------
Name                                 Name                               
Phones (    )     -                  Phones (    )     -                
Company                              Company                            
Position                             Organization Type:                 
Address                                Private citizen                  
Address                                Private enterprise               
                                       Public utility                   
                                       Local government                 
                                       State government                 
                                       Federal government               
City                                 City                               
State                                State                              
Zip                                  Zip                                
------------------------------------------------------------------------
* It is not necessary to wait for all information before calling NRC.   
  National Response Center--1-800-424-8802.                             

Were materials Discharged (Y/N)?                                        
Calling for Responsible Party (Y/N)                                     
                                                                        
------------------------------------------------------------------------
                          Incident Description                          
                                                                        
------------------------------------------------------------------------
Source and/or Cause of Incident                                         
                                                                        
------------------------------------------------------------------------
Date  -  -   Time:                                                      
Cause                                                                   
                                                                        
------------------------------------------------------------------------
Incident Address/Location          Nearest City                         
Distance from City                                                      
Storage Tank Container Type--Above ground (Y/N)          Below ground (Y/
 N)          Unknown                                                    
------------------------------------------------------------------------
                                                                        
                            Facility Capacity                           
                                                                        
------------------------------------------------------------------------
Tank Capacity                                                           
Latitude Degrees                                                        
Longitude Degrees                                                       
Mile Post or River Mile                                                 
                                                                        
------------------------------------------------------------------------
                                Materials                               
                                                                        
------------------------------------------------------------------------
Discharge Unit of Quantity      Measure      Discharged Material        
 Quantity in Water                                                      
                                                                        
------------------------------------------------------------------------

[[Page 7923]]
                                                                        
                             Response Action                            
                                                                        
------------------------------------------------------------------------
Actions Taken to Correct or Mitigate Incident                           
                                                                        
------------------------------------------------------------------------
                                 Impact                                 
                                                                        
------------------------------------------------------------------------
Number of Injuries          Number of Fatalities                        
Were there Evacuations (Y/N/U)?          Number Evacuated               
Was there any Damage (Y/N/U)?          Damage in Dollars                
                                                                        
------------------------------------------------------------------------
                         Additional Information                         
                                                                        
------------------------------------------------------------------------
Any information about the Incident not recorded elsewhere in the report 
                                                                        
------------------------------------------------------------------------
                          Caller Notifications                          
                                                                        
------------------------------------------------------------------------
USCG          EPA          State          Other                         
                                                                        

    (2) Facility's spill mitigation procedures. (i) This subsection 
must describe the volume(s) and oil groups that would be involved in 
the--
    (A) Average most probable discharge from the MTR facility;
    (B) Maximum most probable discharge from the MTR facility;
    (C) Worst case discharge from the MTR facility; and
    (D) Where applicable, the worst case discharge from the non-
transportation-related facility. This must be the same volume provided 
in the response plan for the non-transportation-related facility.
    (ii) This subsection must contain prioritized procedures for 
facility personnel to mitigate or prevent any discharge or substantial 
threat of a discharge of oil resulting from operational activities 
associated with internal or external facility transfers including 
specific procedures to shut down affected operations. Facility 
personnel responsible for performing specified procedures to mitigate 
or prevent any discharge or potential discharge shall be identified by 
job title. A copy of these procedures shall be maintained at the 
facility operations center. These procedures must address actions to be 
taken by facility personnel in the event of a discharge, potential 
discharge, or emergency involving the following equipment and 
scenarios:
    (A) Failure of manifold, mechanical loading arm, other transfer 
equipment, or hoses, as appropriate;
    (B) Tank overfill;
    (C) Tank failure;
    (D) Piping rupture;
    (E) Piping leak, both under pressure and not under pressure, if 
applicable;
    (F) Explosion or fire; and
    (G) Equipment failure (e.g. pumping system failure, relief valve 
failure, or other general equipment relevant to operational activities 
associated with internal or external facility transfers.)
    (iii) This subsection must contain a listing of equipment and the 
responsibilities of facility personnel to mitigate an average most 
probable discharge.
    (3) Facility's response activities. (i) This subsection must 
contain a description of the facility personnel's responsibilities to 
initiate a response and supervise response resources pending the 
arrival of the qualified individual.
    (ii) This subsection must contain a description of the 
responsibilities and authority of the qualified individual and 
alternate as required in Sec. 154.1026.
    (iii) This subsection must describe the organizational structure 
that will be used to manage the response actions. This structure must 
include the following functional areas.
    (A) Command and control;
    (B) Public information;
    (C) Safety;
    (D) Liaison with government agencies;
    (E) Spill Operations;
    (F) Planning;
    (G) Logistics support; and
    (H) Finance.
    (iv) This subsection must identify the oil spill removal 
organizations and the spill management team to:
    (A) Be capable of providing the following response resources:
    (1) Equipment and supplies to meet the requirements of 
Secs. 154.1045, 154.1047 or subparts H or I of this part, as 
appropriate; and
    (2) Trained personnel necessary to continue operation of the 
equipment and staff of the oil spill removal organization and spill 
management team for the first 7 days of the response.
    (B) This section must include job descriptions for each spill 
management team member within the organizational structure described in 
paragraph (b)(3)(iii) of this section. These job descriptions should 
include the responsibilities and duties of each spill management team 
member in a response action.
    (v) For mobile facilities that operate in more than one COTP zone, 
the plan must identify the oil spill removal organization and the spill 
management team in the applicable geographic-specific appendix. The oil 
spill removal organization(s) and the spill management team discussed 
in paragraph (b)(3)(iv)(A) of this section must be included for each 
COTP zone in which the facility will handle, store, or transport oil in 
bulk.
    (4) Fish and wildlife and sensitive environments. (i) This section 
of the plan must identify areas of economic importance and 
environmental sensitivity, as identified in the ACP, which are 
potentially impacted by a worst case discharge. ACPs are required under 
section 311(j)(4) of the FWPCA to identify fish and wildlife and 
sensitive environments. The applicable ACP shall be used to designate 
fish and wildlife and sensitive environments in the plan. Changes to 
the ACP regarding fish and wildlife and sensitive environments shall be 
included in the annual update of the response plan, when available.
    (ii) For a worst case discharge from the facility, this section of 
the plan must--
    (A) List all fish and wildlife and sensitive environments 
identified in the ACP which are potentially impacted by a discharge of 
persistent oils, non-persistent oils, or non-petroleum oils.
    (B) Describe all the response actions that the facility anticipates 
taking to protest these fish and wildlife and sensitive environments.
    (C) Contain a map or chart showing the location of those fish and 
wildlife and sensitive environments which are potentially impacted. The 
map or chart shall also depict each response action that the facility 
anticipates taking to protect these areas. A legend of 

[[Page 7924]]
activities must be included on the map page.
    (iii) For a worst case discharge, this section must identify 
appropriate equipment and required personnel, available by contract or 
other approved means as described in Sec. 154.1028, to protect fish and 
wildlife and sensitive environments which fall within the distances 
calculated using the methods outlined in this paragraph as follows:
    (A) Identify the appropriate equipment and required personnel to 
protect all fish and wildlife and sensitive environments in the ACP for 
the distances, as calculated in paragraph (b)(4)(iii)(B) of this 
section, that the persistent oils, non-persistent oils, or non-
petroleum oils are likely to travel in the noted geographic area(s) and 
number of days listed in Table 2 of appendix C of this part;
    (B) Calculate the distances required by paragraph (b)(4)(iii)(A) of 
this section by selecting one of the methods described in this 
paragraph;
    (1) Distances may be calculated as follows:
    (i) For persistent oils and non-petroleum oils discharged into non-
tidal waters, the distance from the facility reached in 48 hours at 
maximum current.
    (ii) For persistent and non-petroleum oils discharged into tidal 
waters, 15 miles from the facility down current during ebb tide and to 
the point of maximum tidal influence or 15 miles, whichever is less, 
during flood tide.
    (iii) For non-persistent oils discharged into non-tidal waters, the 
distance from the facility reached in 24 hours at maximum current.
    (iv) For non-persistent oils discharged into tidal waters, 5 miles 
from the facility down current during ebb tide and to the point of 
maximum tidal influence or 5 miles, whichever is less, during flood 
tide.
    (2) A spill trajectory or model may be substituted for the 
distances calculated under paragraph (b)(4)(iii)(B)(l) of this section. 
The spill trajectory or model must be acceptable to the COTP.
    (3) The procedures contained in the Environmental Protection's 
Agency's regulations on oil pollution prevention for non-
transportation-related onshore facilities at 40 CFR part 112, appendix 
C, Attachment C-III may be substituted for the distances listed in non-
tidal and tidal waters; and
    (C) Based on historical information or a spill trajectory or model, 
the COTP may require the additional fish and wildlife and sensitive 
environments also be protected.
    (5) Disposal Plan. This subsection must describe any actions to be 
taken or procedures to be used to ensure that all recovered oil and oil 
contaminated debris produced as a result of any discharge are disposed 
according to Federal, state, or local requirements.
    (c) Training and exercises. This section must be divided into the 
following two subsections:
    (1) Training procedures. This subsection must describe the training 
procedures and programs of the facility owner or operator to meet the 
requirements in Sec. 154.1050.
    (2) Exercise procedures. This subsection must describe the exercise 
program to be carried out by the facility owner or operator to meet the 
requirements in Sec. 154.1055.
    (d) Plan review and update procedures. This section must address 
the procedures to be followed by the facility owner or operator to meet 
the requirements of Sec. 154.1065 and the procedures to be followed for 
any post-discharge review of the plan to evaluate and validate its 
effectiveness.
    (e) Appendices. This section of the response plan must include the 
appendices described in this paragraph.
    (1) Facility-specific information. This appendix must contain a 
description of the facility's principal characteristics.
    (i) There must be a physical description of the facility including 
a plan of the facility showing the mooring areas, transfer locations, 
control stations, locations of safety equipment, and the location and 
capacities of all piping and storage tanks.
    (ii) The appendix must identify the sizes, types, and number of 
vessels that the facility can transfer oil to or from simultaneously.
    (iii) The appendix must identify the first valve(s) on facility 
piping separating the transportation-related portion of the facility 
from the non-transportation-related portion of the facility, if any. 
For piping leading to a manifold located on a dock serving tank 
vessels, this valve is the first valve inside the secondary containment 
required by 40 CFR part 112.
    (iv) The appendix must contain information on the oil(s) and 
hazardous material handled, stored, or transported at the facility in 
bulk. A material safety data sheet meeting the requirements of 29 CFR 
1910.1200, 33 CFR 154.310(a)(5) or an equivalent will meet this 
requirement. This information can be maintained separately providing it 
is readily available and the appendix identifies its location. This 
information must include--
    (A) The generic or chemical name;
    (B) A description of the appearance and odor;
    (C) The physical and chemical characteristics;
    (D) The hazards involved in handling the oil(s) and hazardous 
materials. This shall include hazards likely to be encountered if the 
oil(s) and hazardous materials come in contact as a result of a 
discharge; and
    (E) A list of firefighting procedures and extinguishing agents 
effective with fires involving the oil(s) and hazardous materials.
    (v) The appendix may contain any other information which the 
facility owner or operator determines to be pertinent to an oil spill 
response.
    (2) List of contacts. This appendix must include information on 24-
hour contact of key individuals and organizations. If more appropriate, 
this information may be specified in a geographic-specific appendix. 
The list must include--
    (i) The primary and alternate qualified individual(s) for the 
facility;
    (ii) The contact(s) identified under paragraph (b)(3)(iv) of this 
section for activation of the response resources; and
    (iii) Appropriate Federal, State, and local officials.
    (3) Equipment list and records. This appendix must include the 
information specified in this paragraph.
    (i) The appendix must contain a list of equipment and facility 
personnel required to respond to an average most probable discharge, as 
defined in Sec. 154.1020. The appendix must also list the location of 
the equipment.
    (ii) The appendix must contain a detailed listing of all the major 
equipment identified in the plan as belonging to an oil spill removal 
organization(s) that is available, by contract or other approved means 
as described in Sec. 154.1028(a), to respond to a maximum most probable 
or worst case discharge, as defined in Sec. 154.1020. The detailed 
listing of all major equipment may be located in a separate document 
referenced by the plan. Either the appendix or the separate document 
referenced in the plan must provide the location of the major response 
equipment.
    (iii) It is not necessary to list response equipment from oil spill 
removal organization(s) when the organization has been classified by 
the Coast Guard and their capacity has been determined to equal or 
exceed the response capability needed by the facility. For oil spill 
removal organization(s) classification by the Coast Guard, the 
classified must be noted in this section of the plan. When it is 
necessary for the appendix to contain a listing of response equipment, 
it shall include all of the following items that are identified in the 

[[Page 7925]]
response plan: Skimmers; booms; dispersant application, in-situ 
burning, bioremediation equipment and supplies, and other equipment 
used to apply other chemical agents on the NCP Product Schedule (if 
applicable); communications, firefighting, and beach cleaning 
equipment; boats and motors; disposal and storage equipment; and heavy 
equipment. The list must include for each piece of equipment--
    (A) The type, make, model, and year of manufacture listed on the 
nameplate of the equipment;
    (B) For oil recovery devices, the effective daily recovery rate, as 
determined using section 6 of Appendix C of this part;
    (C) For containment boom, the overall boom height (draft and 
freeboard) and type of end connectors;
    (D) The spill scenario in which the equipment will be used for or 
which it is contracted;
    (E) The total daily capacity for storage and disposal of recovered 
oil;
    (F) For communication equipment, the type and amount of equipment 
intended for use during response activities. Where applicable, the 
primary and secondary radio frequencies must be specified.
    (G) Location of the equipment; and
    (H) The date of the last inspection by the oil spill removal 
organization(s).
    (4) Communications plan. This appendix must describe the primary 
and alternate method of communication during discharges, including 
communications at the facility and at remote locations within the areas 
covered by the response plan. The appendix may refer to additional 
communications packages provided by the oil spill removal organization. 
This may reference another existing plan or document.
    (5) Site-specific safety and health plan. This appendix must 
describe the safety and health plan to be implemented for any response 
location(s). It must provide as much detailed information as is 
practicable in advance of an actual discharge. This appendix may 
reference another existing plan requiring under 29 CFR 1910.120.
    (6) List of acronyms and definitions. This appendix must list all 
acronyms used in the response plan including any terms or acronyms used 
by Federal, State, or local governments and any operational terms 
commonly used at the facility. This appendix must include all 
definitions that are critical to understanding the response plan.

Sec. 154.1040  Specific requirements for facilities that could 
reasonably be expected to cause substantial harm to the environment.

    (a) The owner or operator of a facility that, under Sec. 154.1015, 
could reasonably be expected to cause substantial harm to the 
environment, shall submit a response plan that meets the requirements 
of Sec. 154.1035, except as modified by this section.
    (b) The facility's response activities section of the response plan 
need not list the facility or corporate organizational structure that 
will be used to manage the response, as required by 
Sec. 154.1035(b)(3)(iii).
    (c) The owner or operator of a facility must ensure the 
availability of response resources required to be identified in 
Sec. 154.1035(b)(3)(iv) by contract or other approved means described 
in Sec. 154.1028.
    (d) A facility owner or operator must have at least 200 feet of 
containment boom and the means of deploying and anchoring the boom 
available at the spill site within 1 hour of the detection of a spill 
to respond to the average most probable discharge in lieu of the 
quantity of containment boom specified in Sec. 154.1045(c)(1). Based on 
site-specific or facility-specific information, the COTP may specify 
that additional quantities of containment boom are available within one 
hour. In addition, there must be adequate sorbent material for initial 
response to an average most probable discharge. If the facility is a 
fixed facility, the containment boom and sorbent material must be 
located at the facility. If the facility is a mobile facility, the 
containment boom and sorbent must be available locally and be at the 
site of the discharge within 1 hour of its discovery.

Sec. 154.1041  Specific response information to be maintained on mobile 
MTR facilities.

    (a) Each mobile MTR facility must carry the following information 
as contained in the response plan when performing transfer operations:
    (1) A description of response activities for a discharge which may 
occur during transfer operations. This may be a narrative description 
or a list of procedures to be followed in the event of a discharge.
    (2) Identity of response resources to respond to a discharge from 
the mobile MTR facility.
    (3) List of the appropriate persons and agencies (including the 
telephone numbers) to be contacted in regard to a discharge and its 
handling, including the National Response Center.
    (b) The owner or operator of the mobile facility must also retain 
the information in this paragraph at the principal place of business.

Sec. 154.1045  Response plan development and evaluation criteria for 
facilities that handle, store, or transport Group I through Group IV 
petroleum oils.

    (a) The owner or operator of a facility that handles, stores, or 
transports Group I through Group IV petroleum oils shall use the 
criteria in this section to evaluate response resources identified in 
the response plan for the specified operating environment.
    (1) The criteria in Table 1 of appendix C of this part are to be 
used solely for identification of appropriate equipment in a response 
plan. These criteria reflect conditions used for planning purposes to 
select mechanical response equipment and are not conditions that would 
limit response actions or affect normal facility operations.
    (2) The response resources must be evaluated considering 
limitations for the COTP zones in which the facility operates, 
including but not limited to--
    (i) Ice conditions;
    (ii) Debris;
    (iii) Temperature ranges;
    (iv) Weather-related visibility; and
    (v) Other appropriate environmental conditions as determined by the 
COTP.
    (3) The COTP may reclassify a specific body of water or location 
within the COTP zone. Any reclassifications will be identified by the 
COTP in the applicable ACP. Reclassifications may be to--
    (i) A more stringent operating environment if the prevailing wave 
conditions exceed the significant wave height criteria during more than 
35 percent of the year; or
    (ii) A less stringent operating environment if the prevailing wave 
conditions do not exceed the significant wave height criteria for the 
less stringent operating environment during more than 35 percent of the 
year.
    (b) Response equipment must--
    (1) Meet or exceed the operating criteria listed in Table 1 of 
appendix C of this part;
    (2) Function in the applicable operating environment; and
    (3) Be appropriate for the petroleum oil carried.
    (c) The response plan for a facility that handles, stores, or 
transports Group I through Group IV petroleum oils must identify 
response resources that are available, by contract or other approved 
means as described in Sec. 154.1028(a)(1)(4), to respond to the 
facility's average most probable discharge. The response resources must 
include, at a minimum--
    (1) 1,000 feet of containment boom or two times the length of the 
largest vessel 

[[Page 7926]]
that regularly conducts petroleum oil transfers to or from the 
facility, whichever is greater, and the means of deploying and 
anchoring the boom available at the spill site within 1 hour of the 
detection of a spill; and
    (2) Oil recovery devices and recovered oil storage capacity capable 
of being at the spill site within 2 hours of the discovery of a 
petroleum oil discharge from a facility.
    (d) The response plan for a facility that handles, stores, or 
transports Group I through Group IV petroleum oils must identify 
response resources that are available, by contract or other approved 
means as described in Sec. 154.1028(a)(1)(4), to respond to a discharge 
up to the facility's maximum most probable discharge volume.
    (1) The response resources must include sufficient containment 
boom, oil recovery devices, and storage capacity for any recovery of up 
to the maximum most probable discharge planning volume, as contained in 
appendix C.
    (2) The response resources must be appropriate for each group of 
petroleum oil identified in Sec. 154.1020 that is handled, stored, or 
transported by the facility.
    (3) These response resources must be positioned such that they can 
arrive at the scene of a discharge within the following specified 
times:
    (i) The equipment identified in paragraphs (c)(1) and (c)(2) of 
this section or in Sec. 154.1040(d) must arrive within the times 
specified in those paragraphs or that section, as appropriate.
    (ii) In higher volume port areas and the Great Lakes, response 
resources must be capable of arriving on scene within 6 hours of the 
discovery of an petroleum oil discharge from a facility.
    (iii) In all other locations, response resources must be capable of 
arriving on scene within 12 hours of the discovery of a petroleum oil 
discharge from a facility.
    (4) The COTP may determine that mobilizing response resources to an 
area beyond the response times indicated in this paragraph invalidates 
the response plan. In this event, the COTP may impose additional 
operational restrictions (e.g., limitations on the number of transfers 
at a facility), or, at the COTP's discretion, the facility may operate 
with temporarily modified response plan development and evaluation 
criteria (e.g., modified response times, alternate response resources, 
etc.).
    (e) The response plan for a facility that handles, stores, or 
transports Group I through Group IV petroleum oils must identify the 
response resources that are available, by contract or other approved 
means as described in Sec. 154.1028(a)(1)(4), to respond to the worst 
case discharge volume of petroleum oil to the maximum extent 
practicable.
    (1) The location of these response resources must be suitable to 
meet the response times identified in paragraph (f) of this section for 
the applicable geographic area(s) of operation and response tier.
    (2) The response resources must be appropriate for--
    (i) The volume of the facility's worst case discharge;
    (ii) Group(s) of petroleum oil as identified in Sec. 154.1020 that 
are handled, stored, or transported by the facility; and
    (iii) The geographic area(s) in which the facility operates.
    (3) The response resources must include sufficient boom, oil 
recovery devices, and storage capacity to recover the worst case 
discharge planning volumes.
    (4) The guidelines in appendix C of this part must be used for 
calculating the quantity of response resources required to respond at 
each tier to the worst case discharge to the maximum extent 
practicable.
    (5) When determining response resources necessary to meet the 
requirements of this section, a portion of those resources must be 
capable of use in close-to-shore response activities in shallow water. 
The following percentages of the response equipment identified for the 
applicable geographic area must be capable of operating in waters of 6 
feet or less depth.
    (i) Offshore--10 percent.
    (ii) Nearshore/inland/Great Lakes/rivers and canals--20 percent.
    (6) The COTP may determine that mobilizing response resources to an 
area beyond the response times indicated in this paragraph invalidates 
the response plan. In this event, the COTP may impose additional 
operational restrictions (e.g., limitations on the number of transfers 
at a facility), or, at the COTP's discretion, the facility may be 
permitted to operate with temporarily modified response plan 
development and evaluation criteria (e.g., modified response times, 
alternate response resources, etc.).
    (f) Response equipment identified in a response plan for a facility 
that handles, stores, or transports Group I through Group IV petroleum 
oils must be capable of arriving on scene within the times specified in 
this paragraph for the applicable response tier in a higher volume port 
area, Great Lakes, and in other areas. Response times for these tiers 
from the time of discovery of a discharge are--

------------------------------------------------------------------------
                                                Tier 1   Tier 2   Tier 3
                                                (hrs.)   (hrs.)   (hrs.)
------------------------------------------------------------------------
Higher volume port area (except for a TAPAA                             
 facility located in Prince William Sound,                              
 see Sec.  154.1135).........................        6       30       54
Great Lakes..................................       12       36       60
All other river and canal, inland, nearshore,                           
 and offshore areas..........................       12       36       60
------------------------------------------------------------------------

    (g) For the purposes of arranging for response resources for a 
facility that handles, stores, or transports Group I through Group IV 
petroleum oils, by contract or other approved means as described in 
Sec. 154.1028(a)(1)-(4), response equipment identified for Tier 1 plan 
credit must be capable of being mobilized and en route to the scene of 
a discharge within 2 hours of notification. The notification procedures 
identified in the plan must provide for notification and authorization 
of mobilization of identified Tier 1 response resources--
    (1) Either directly or through the qualified individual; and
    (2) Within 30 minutes of a discovery of a discharge or substantial 
threat of discharge.
    (h) Response resources identified for Tier 2 and Tier 3 plan credit 
must be capable of arriving on scene within the time specified for the 
applicable tier.
    (i) The response plan for a facility that is located in any 
environment with year-round preapproval for use of dispersants and that 
handles, stores, or transports Group II or III persistent petroleum 
oils may request a credit for up to 25 percent of the on-water recovery 
capability set forth by this part. To receive this credit, the facility 
owner or operator must identify in the plan and ensure, by contract or 
other approved means as described in Sec. 154.1028(a)(1)-(4), the 
availability of specified resources to apply the dispersants and to 
monitor their effectiveness. The extent of the credit will be based on 
the volumes of the dispersant available to sustain operations at the 
manufacturers' recommend dosage rates. Resources identified for plan 
credit should be capable of being on scene within 12 hours of a 
discovery of a discharge. Identification of these resources does not 
imply that they will be authorized for use. Actual authorization for 
use 

[[Page 7927]]
during a spill response will be governed by the provisions of the NCP 
and the applicable ACP.
    (j) A response plan for a facility that handles, stores, or 
transports Group I through Group IV petroleum oils must identify 
response resources with firefighting capability. The owner or operator 
of a facility that does not have adequate firefighting resources 
located at the facility or that can not rely on sufficient local 
firefighting resources must identify and ensure, by contract or other 
approved means as described in Sec. 154.1028(a)(1)-(4), the 
availability of adequate firefighting resources. The response plan must 
also identify an individual located at the facility to work with the 
fire department for petroleum oil fires. This individual shall also 
verify that sufficient well-trained firefighting resources are 
available within a reasonable time to respond to a worst case 
discharge. The individual may be the qualified individual as defined in 
Sec. 154.1020 and identified in the response plan or another 
appropriate individual located at the facility.
    (k) The response plan for a facility that handles, stores, or 
transports Groups I through IV petroleum oils must identify equipment 
and required personnel available, by contract or other approved means 
as described in Sec. 154.1028(a) (1)-(4), to protect fish and wildlife 
and sensitive environments.
    (1) Except as set out in paragraph (k)(2) of this section, the 
identified response resources must include the quantities of boom 
sufficient to protect fish and wildlife and sensitive environments as 
required by Sec. 154.1035(b)(4).
    (2) The resources and response methods identified in a facility 
response plan must be consistent with the required resources and 
response methods to be used in fish and wildlife and sensitive 
environments, contained in the appropriate ACP. Facility owners or 
operators shall ensure that their response plans are in accordance with 
the ACP in effect 6 months prior to initial plan submission or the 
annual plan review required under Sec. 154.1065(a). Facility owners or 
operators are not required to, but may at their option, conform to an 
ACP which is less than 6 months old at the time of plan submission.
    (l) The response plan for a facility that handles, stores, or 
transports Groups I through IV petroleum oils must identify an oil 
spill removal organization(s) with response resources that are 
available, by contract or other approved means as described in 
Sec. 154.1028(a) (1)-(4), to effect a shoreline cleanup operation 
commensurate with the quantity of emulsified petroleum oil to be 
planned for in shoreline cleanup operations.
    (1) Except as required in paragraph (l)(2) of this section, the 
shoreline cleanup response resources required must be determined as 
described in appendix C of this part.
    (2) The resources and response methods identified in a facility 
response plan must be consistent with the required shoreline cleanup 
resources and methods contained in the appropriate ACP. Facility owners 
or operators shall ensure that their response plans are in accordance 
with the ACP in effect 6 months prior to initial plan submission or the 
annual plan review required under Sec. 154.1065(a). Facility owners or 
operators are not required to, but may at their option, conform to an 
ACP which is less than 6 months old at the time of plan submission.
    (m) Appendix C of this part describes the procedures to determine 
the maximum extent practicable quantity of response resources that must 
be identified and available, by contract or other approved means as 
described in Sec. 154.1028(a) (1)-(4), for the maximum most probable 
discharge volume, and for each worst case discharge response tier.
    (1) Included in appendix C of this part is a cap that recognizes 
the practical and technical limits of response capabilities that an 
individual facility owner or operator can be expected to contract for 
in advance.
    (2) Table 5 in appendix C of this part lists the caps that apply in 
February 18, 1993, and February 18, 1998. Depending on the quantity and 
type of petroleum oil handled by the facility and the facility's 
geographic area of operations, the resource capability caps in this 
table may be reached. The owner or operator of a facility whose 
estimated recovery capacity exceeds the applicable contracting caps in 
Table 5 shall identify sources of additional equipment equal to twice 
the cap listed in Tiers 1, 2, and 3 or the amount necessary to reach 
the calculated planning volume, whichever is lower. The identified 
resources must be capable of arriving on scene not later than the Tier 
1, 2, and 3 response times in this section. No contract is required. 
While general listings of available response equipment may be used to 
identify additional sources, a response plan must identify the specific 
sources, locations, and quantities of equipment that a facility owner 
or operator has considered in his or her planning. When listing Coast 
Guard classified oil spill removal organization(s) which have 
sufficient removal capacity to recover the volume above the response 
capability cap for the specific facility, as specified in Table 5 in 
appendix C of this part, it is not necessary to list specific 
quantities of equipment.
    (n) The Coast Guard will initiate a review of cap increases and 
other requirements contained within this subpart that are scheduled to 
be phased in over time. Any changes in the requirements of this section 
will occur through a public notice and comment process.
    (1) During this review, the Coast Guard will determine if the 
scheduled increase for February 1998 remains practicable, and will also 
establish a specific cap for 2003. The review will include but is not 
limited to--
    (i) Increase in skimming efficiencies and design technology;
    (ii) Oil tracking technology;
    (iii) High rate response techniques;
    (iv) Other applicable response technologies; and
    (v) Increases in the availability of private response resources.
    (2) All scheduled future requirements will take effect unless the 
Coast Guard determines that they are not practicable. Scheduled changes 
will be effective in February 1998 and 2003 unless the review of the 
additional requirements has not been completed by the Coast Guard. If 
this occurs, the additional requirements will not be effective until 90 
days after publication of a Federal Register notice with the results of 
the review.

Sec. 154.1047  Response plan development and evaluation criteria for 
facilities that handle, store, or transport Group V petroleum oils.

    (a) An owner or operator of a facility that handles, stores, or 
transports Group V petroleum oils must provide information in his or 
her response plan that identifies--
    (1) Procedures and strategies for responding to a worst case 
discharge of Group V petroleum oils to the maximum extent practicable; 
and
    (2) Sources of the equipment and supplies necessary to locate, 
recover, and mitigate such a discharge.
    (b) An owner or operator of a facility that handles, stores, or 
transports Group V petroleum oil must ensure that any equipment 
identified in a response plan is capable of operating in the conditions 
expected in the geographic area(s) in which the facility operates using 
the criteria in Table 1 of appendix C of this part. When evaluating the 
operability of equipment, the facility owner or operator must consider 
limitations that are identified in the ACPs for the COTP 

[[Page 7928]]
zones in which the facility operates, including--
    (1) Ice conditions;
    (2) Debris;
    (3) Temperature ranges; and
    (4) Weather-related visibility.
    (c) The owner or operator of a facility that handles, stores, or 
transports Group V petroleum oil must identify the response resources 
that are available by contract or other approved means as described in 
Sec. 154.1028. The equipment identified in a response plan must 
include--
    (1) Sonar, sampling equipment, or other methods for locating the 
petroleum oil on the bottom or suspended in the water column;
    (2) Containment boom, sorbent boom, silt curtains, or other methods 
for containing the petroleum oil that may remain floating on the 
surface or to reduce spreading on the bottom;
    (3) Dredges, pumps, or other equipment necessary to recover 
petroleum oil from the bottom and shoreline;
    (4) Equipment necessary to assess the impact of such discharges; 
and
    (5) Other appropriate equipment necessary to respond to a discharge 
involving the type of petroleum oil handled, stored, or transported.
    (d) Response resources identified in a response plan for a facility 
that handles, stores, or transports Group V petroleum oils under 
paragraph (c) of this section must be capable of being at the spill 
site within 24 hours of discovery of a discharge.
    (e) A response plan for a facility that handles, stores, or 
transports Group V petroleum oils must identify response resources with 
firefighting capability. The owner or operator of a facility that does 
not have adequate firefighting resources located at the facility or 
that can not rely on sufficient local firefighting resources must 
identity and ensure, by contract or other approved means as described 
in Sec. 154.1028, the availability of adequate firefighting resources. 
The response plan must also identify an individual located at the 
facility to work with the fire department for petroleum oil fires. This 
individual shall also verify that sufficient well-trained firefighting 
resources are available within a reasonable response time to a worst 
case scenario. The individual may be the qualified individual as 
defined in Sec. 154.1020 and identified in the response plan or another 
appropriate individual located at the facility.

Sec. 154.1050  Training.

    (a) A response plan submitted to meet the requirements of 
Secs. 154.1035 or 154.1040, as appropriate, must identify the training 
to be provided to each individual with responsibilities under the plan. 
A facility owner or operator must identify the method to be used for 
training any volunteers or casual laborers used during a response to 
comply with the requirements of 29 CFR 1910.120.
    (b) A facility owner or operator shall ensure the maintenance of 
records sufficient to document training of facility personnel; and 
shall make them available for inspection upon request by the U.S. Coast 
Guard. Records for facility personnel must be maintained at the 
facility for 3 years.
    (c) Where applicable, a facility owner or operator shall ensure 
that an oil spill removal organization identified in a response plan to 
meet the requirements of this subpart maintains records sufficient to 
document training for the organization's personnel and shall make them 
available for inspection upon request by the facility's management 
personnel, the qualified individual, and U.S. Coast Guard. Records must 
be maintained for 3 years following completion of training.
    (d) The facility owner or operator remains responsible for ensuring 
that all private response personnel are trained to meet the 
Occupational Safety and Health Administration (OSHA) standards for 
emergency response operations in 29 CFR 1910.120.

Sec. 154.1055  Exercises.

    (a) A response plan submitted by an owner or operator of an MTR 
facility must include an exercise program containing both announced and 
unannounced exercises. The following are the minimum exercise 
requirements for facilities covered by this subpart:
    (1) Qualified individual notification exercises (quarterly).
    (2) Spill management team tabletop exercises (annually). In a 3-
year period, at least one of these exercises must include a worst case 
discharge scenario.
    (3) Equipment deployment exercises:
    (i) Semiannually for facility owned and operated equipment.
    (ii) Annually for oil spill removal organization equipment.
    (4) Emergency procedures exercises (optional).
    (5) Annually, at least one of the exercises listed in 
Sec. 154.1055(a)(2) through (4) must be unannounced. Unannounced means 
the personnel participating in the exercise must not be advised in 
advance, of the exact date, time and scenario of the exercise.
    (6) The facility owner or operator shall design the exercise 
program so that all components of the response plan are exercised at 
least once every 3 years. All of the components do not have to be 
exercised at one time; they may be exercised over the 3-year period 
through the required exercises or through an Area exercise.
    (b) A facility owner or operator shall participate in unannounced 
exercises, as directed by the COTP. The objectives of the unannounced 
exercises will be to test notifications and equipment deployment for 
response to the average most probable discharge. After participating in 
an unannounced exercise directed by a COTP, the owner or operator will 
not be required to participate in another COTP initiated unannounced 
exercise for at least 3 years from the date of the exercise.
    (c) A facility owner or operator shall participate in Area 
exercises as directed by the applicable On-Scene Coordinator. The Area 
exercises will involve equipment deployment to respond to the spill 
scenario developed by the Exercise Design Team, of which the facility 
owner or operator will be a member. After participating in an Area 
exercise, a facility owner or operator will not be required to 
participate in another Area exercise for at least 6 years.
    (d) The facility owner or operator shall ensure that adequate 
records of all required exercises are maintained at the facility for 3 
years. Records shall be made available to the Coast Guard upon request.
    (e) The response plan submitted to meet the requirements of this 
subpart must specify the planned exercise program. The plan must detail 
the exercise program, including the types of exercises, frequency, 
scope, objectives and the scheme for exercising the entire response 
plan every 3 years.
    (f) Compliance with the National Preparedness for Response Exercise 
Program (PREP) Guidelines will satisfy the facility response plan 
exercise requirements.

Sec. 154.1057  Inspection and maintenance of response resources.

    (a) A facility owner or operator required to submit a response plan 
under this part must ensure that--
    (1) Containment booms, skimmers, vessels, and other major equipment 
listed or referenced in the plan are periodically inspected and 
maintained in good operating condition, in accordance with 
manufacturer's recommendations, and best commercial practices; and
    (2) All inspection and maintenance is documented and that these 
records are maintained for 3 years.

[[Page 7929]]

    (b) For equipment which must be inspected and maintained under this 
section the Coast Guard may--
    (1) Verify that the equipment inventories exist as represented;
    (2) Verify the existences of records required under this section;
    (3) Verify that the records of inspection and maintenance reflect 
the actual condition of any equipment listed or referenced; and
    (4) Inspect and require operational tests of equipment.
    (c) This section does not apply to containment booms, skimmers, 
vessels, and other major equipment listed or referenced in the plan and 
ensured available from an oil spill removal organization through the 
written consent required under Sec. 154.1028(a)(5).

Sec. 154.1060  Submission and approval procedures.

    (a) The owner or operator of a facility to which this subpart 
applies shall submit one copy of a facility response plan meeting the 
requirements of this subpart to the COTP for initial review and, if 
appropriate, approval.
    (b) The owner or operator of a facility to which this subpart 
applies shall include a statement certifying that the plan meets the 
applicable requirements of subparts F, G, H, and I of this part, as 
appropriate.
    (c) For an MTR facility that is located in the inland response zone 
where the EPA Regional Administrator is the predesignated Federal On-
Scene Coordinator, the COTP may consult with the EPA Federal On-Scene 
Coordinator prior to any final approval.
    (d) For an MTR facility identified in Sec. 154.1015(c) of this 
subpart that is also required to prepare a response plan under 40 CFR 
part 112, if the COTP determines that the plan meets all applicable 
requirements and the EPA Regional Administrator raises no objection to 
the response plan contents, the COTP will notify the facility owner or 
operator in writing that the plan is approved.
    (e) The plan will be valid for a period of up to 5 years. The 
facility owner or operator must resubmit an updated plan every 5 years 
as follows:
    (1) For facilities identified in only Sec. 154.1015(b) of this 
subpart, the 5-year period will commence on the date the plan is 
submitted to the COTP.
    (2) For facilities identified in Sec. 154.1015(c) of this subpart, 
the 5-year period will commence on the date the COTP approves the plan.
    (3) All resubmitted response plans shall be accompanied by a cover 
letter containing a detailed listing of all revisions to the response 
plan.
    (f) For an MTR facility identified in Sec. 154.1015(c)(2) the COTP 
will notify the facility owner or operator in writing that the plan is 
approved.
    (g) If a COTP determines that a plan does not meet the requirements 
of this subpart either upon initial submission or upon 5-year 
resubmission, the COTP will return the plan to the facility owner or 
operator along with an explanation of the response plan's deficiencies. 
The owner or operator must correct any deficiencies in accordance with 
Sec. 154.1070 and return the plan to the COTP within the time specified 
by the COTP in the letter describing the deficiencies.
    (h) The facility owner or operator and the qualified individual and 
the alternative qualified individual shall each maintain a copy of the 
most current response plan submitted to the COTP. One copy must be 
maintained at the facility in a position where the plan is readily 
available to persons in charge of conducting transfer operations.

Sec. 154.1065  Plan review and revision procedures.

    (a) A facility owner or operator must review his or her response 
plan(s) annually. This review shall incorporate any revisions to the 
plan, including listings of fish and wildlife and sensitive 
environments identified in the ACP in effect 6 months prior to plan 
review.
    (1) For an MTR facility identified in Sec. 154.1015(c) of this 
subpart as a ``significant and substantial harm facility,'' this review 
must occur within 1 month of the anniversary date of COTP approval of 
the plan. For an MTR facility identified in Sec. 154.1015(b) of this 
subpart, as a ``substantial harm facility'' this review must occur 
within 1 month of the anniversary date of submission of the plan to the 
COTP.
    (2) The facility owner or operator shall submit any revision(s) to 
the response plan to the COTP and all other holders of the response 
plan for information or approval, as appropriate.
    (i) Along with the revisions, the facility owner or operator shall 
submit a cover letter containing a detailed listing of all revisions to 
the response plan.
    (ii) If no revisions are required, the facility owner or operator 
shall indicate the completion of the annual review on the record of 
changes page.
    (iii) The COTP will review the revision(s) submitted by the owner 
or operator and will give written notice to the owner or operator of 
any COTP objection(s) to the proposed revisions within 30 days of the 
date the revision(s) were submitted to the COTP. The revisions shall 
become effective not later than 30 days from their submission to the 
COTP unless the COTP indicates otherwise in writing as provided in this 
paragraph. If the COTP indicates that the revision(s) need to be 
modified before implementation, the owner or operator will modify the 
revision(s) within the time period set by the COTP.
    (3) Any required revisions must be entered in the plan and noted on 
the record of changes page.
    (b) The facility owner or operator shall submit revisions to a 
previously submitted or approved plan to the COTP and all other holders 
of the response plan for information or approval within 30 days, 
whenever there is--
    (1) A change in the facility's configuration that significantly 
affects the information included in the response plan;
    (2) A change in the type of oil (petroleum oil group) handled, 
stored, or transported that affects the required response resources;
    (3) A change in the name(s) or capabilities of the oil spill 
removal organization required by Sec. 154.1045;
    (4) A change in the facility's emergency response procedures;
    (5) A change in the facility's operating area that includes ports 
or geographic area(s) not covered by the previously approved plan. A 
facility may not operate in an area not covered in a plan previously 
submitted or approved, as appropriate, unless the revised plan is 
approved or interim operating approval is received under Sec. 154.1025; 
or
    (6) Any other changes that significantly affect the implementation 
of the plan.
    (c) Except as required in paragraph (b) of this section, revisions 
to personnel and telephone number lists included in the response plan 
do not require COTP approval. The COTP and all other holders of the 
response plan shall be advised of these revisions and provided a copy 
of the revisions as they occur.
    (d) The COTP may require a facility owner or operator to revise a 
response plan at any time as a result of a compliance inspection if the 
COTP determines that the response plan does not meet the requirements 
of this subpart or as a result of inadequacies noted in the response 
plan during an actual pollution incident at the facility.

Sec. 154.1070  Deficiencies.

    (a) The cognizant COTP will notify the facility owner or operator 
in writing of any deficiencies noted during review of a response plan, 
drills observed by the Coast Guard, or inspection of equipment or 
records maintained in connection with this subpart.

[[Page 7930]]

    (b) Deficiencies shall be corrected within the time period 
specified in the written notice provided by the COTP. The facility 
owner or operator who disagr
FR Doc. 96-4274 Response Plans for Marine Transportation-Related Facilities
ees with a deficiency issued by the COTP 
may appeal the deficiency to the cognizant COTP within 7 days or the 
time specified by the COTP to correct the deficiency, whichever is 
less. This time commences from the date of receipt of the COTP notice. 
The owner or operator may request a stay from the COTP decision pending 
appeal in accordance with Sec. 154.1075.
    (c) If the facility owner or operator fails to correct any 
deficiencies or submit a written appeal, the COTP may invoke the 
provisions of Sec. 154.1025 prohibiting the facility from storing, 
handling, or transporting oil.

Sec. 154.1075  Appeal process.

    (a) Any owner or operator of a facility who desires to appeal the 
classification that a facility could reasonably be expected to cause 
substantial harm or significant and substantial harm to the 
environment, shall submit a written request to the cognizant COTP 
requesting review and reclassification by the COTP. The facility owner 
or operator shall identify those factors to be considered by the COTP. 
The factors to be considered by the COTP regarding reclassification of 
a facility include, but are not limited to, those listed in 
Sec. 154.1016(b). After considering all relevant material presented by 
the facility owner or operator and any additional material available to 
the COTP, the COTP will notify the facility owner or operator of the 
decision on the reclassification of the facility.
    (b) Any facility owner or operator directly affected by an initial 
determination or action of the COTP may submit a written request to the 
cognizant COTP requesting review and reconsideration of the COTP's 
decision or action. The facility owner or operator shall identify those 
factors to be considered by the COTP in making his or her decision on 
reconsideration.
    (c) Within 10 days of the COTP's decision under paragraph (b) of 
this section, the facility owner or operator may appeal the decision of 
the COTP to the District Commander. This appeal shall be made in 
writing via the cognizant COTP to the District Commander of the 
district in which the office of the COTP is located.
    (d) Within 30 days of the District Commander's decision, the 
facility owner or operator may formally appeal the decision of the 
District Commander. This appeal shall be submitted in writing to 
Commandant (G-MEP) via the District Commander.
    (e) When considering an appeal, the COTP, District Commander, or 
Commandant may stay the effect of the decision or action being appealed 
pending the determination of the appeal.
    3. Subpart G is revised to read as follows:
Subpart G--Additional Response Plan Requirements for a Trans Alaska 
Pipeline Authorization Act (TAPAA) Facility Operating in Prince William 
Sound, Alaska
Sec. 154.1110 Purpose and applicability.
154.1115 Definitions.
154.1120 Operating restrictions and interim operating authorization.
154.1125 Additional response plan requirements.
154.1130 Requirements for prepositioned response equipment.
154.1135 Response plan development and evaluation criteria.
154.1140 TAPAA facility contracting with a vessel.

Subpart G--Additional Response Plan Requirements for a Trans-Alaska 
Pipeline Authorization Act (TAPAA) Facility Operating in Prince 
William Sound, Alaska

Sec. 154.1110  Purpose and applicability.

    (a) This subpart establishes oil spill response planning 
requirements for a facility permitted under the Tans-Alaska Pipeline 
Authorization Act (TAPAA), in addition to the requirements of subpart F 
of this part. The requirements of this subpart are intended for use in 
developing response plans and identifying response resources during the 
planning process. They are not performance standards.
    (b) The information required by this subpart must be included in 
the Prince William Sound facility-specific appendix to the facility 
response plan required by subpart F of this part.

Sec. 154.1115  Definitions.

    In addition to the definitions in this section, the definitions in 
Secs. 154.105 and 154.1020 apply to this subpart. As used in this 
subpart--
    Crude oil means any liquid hydrocarbon mixture occurring naturally 
in the earth, whether or not treated to render it suitable for 
transportation, and includes crude oil from which certain distillate 
fractions may have been removed, and crude oil to which certain 
distillate fractions may have been added.
    Non-crude oil means any oil other than crude oil.
    Prince William Sound means all State and Federal waters within 
Prince William Sound, Alaska, including the approach to Hinchinbrook 
Entrance out to and encompassing Seal Rocks.

Sec. 154.1120  Operating restrictions and interim operating 
authorization.

    (a) The owner or operator of a TAPAA facility may not operate in 
Prince William Sound, Alaska, unless the requirements of this subpart 
as well as Sec. 154.1025 have been met. The owner or operator of a 
TAPAA facility shall certify to the COTP that he or she has provided, 
through an oil spill removal organization required by Sec. 154.1125, 
the necessary response resources to remove, to the maximum extend 
practicable, a worst case discharge or a discharge of 200,000 barrels 
of oil, whichever is grater, in Prince William Sound.
    (b) Coast Guard approval of a TAPAA facility response plan is 
effective only so long as the appropriate Regional Citizens Advisory 
Council(s) is funded pursuant to the requirements of section 5002(k) of 
the Oil Pollution Act of 1990 (Pub. L. 101-380; 104 Stat. 484, 550).

Sec. 154.1125  Additional response plan requirements.

    (a) The owner or operator of a TAPAA facility shall include the 
following information in the Prince William Sound appendix to the 
response plan required by subpart F of this part:
    (1) Oil spill removal organization. Identification of an oil spill 
removal organization that shall--
    (i) Perform response activities;
    (ii) Provide oil spill removal and containment training, including 
training in the operation of prepositioned equipment for personnel, 
including local residents and fishermen, from the following locations 
in Prince William Sound:
    (A) Valdez;
    (B) Tatitlek;
    (C) Cordova;
    (D) Whittier;
    (E) Chenega; and
    (F) Fish hatcheries located at Port San Juan, Main Bay, Esther 
Island, Cannery Creek, and Solomon Gulch.
    (iii) Provide a plan for training, in addition to the personnel 
listed in paragraph (a)(1)(ii) of this section, sufficient numbers of 
trained personnel to remove, to the maximum extent practicable, a worst 
case discharge; and
    (iv) Address the responsibilities required in 
Sec. 154.1035(b)(3)(iii).
    (2) Exercises. Identification of exercise procedures that must--
    (i) Provide for two exercises of the oil spill removal organization 
each year that test the ability of the prepositioned equipment and 
trained personnel required under this subpart to perform effectively;
    (ii) Consist of both announced and unannounced drills; and
    
[[Page 7931]]

    (iii) Include design(s) for exercises that test either the entire 
appendix or individual components(s).
    (3) Testing, inspection, and certification. Identification of a 
testing, inspecting, and certification program for the prepositioned 
response equipment required in Sec. 154.1130 that must provide for--
    (i) Annual testing and equipment inspection in accordance with the 
manufacturer's recommended procedures, to include--
    (A) Start-up and running under load all electrical motors, pumps, 
power packs, air compressors, internal combustion engines, and oil 
recovery devices; and
    (B) Removal for inspection of no less than one-third of required 
boom from storage annually, such that all boom will have been removed 
and inspected within a period of 3 years; and
    (ii) Records of equipment tests and inspection.
    (iii) Use of an independent entity to certify that the equipment is 
on-site and in good operating condition and that required tests and 
inspection have been preformed. The independent entity must have 
appropriate training and expertise to provide this certification.
    (4) Prepositioned response equipment. Identification and location 
of the prepositioned response equipment required in Sec. 154.1130 
including the make, model, and effective daily recovery rate of each 
oil recovery resource.
    (b) The owner or operator of a TAPAA facility shall submit to the 
COTP a schedule for the training and drills required by the geographic-
specific appendix for Prince William Sound for the following calendar 
year.
    (c) All records required by this section must be available for 
inspection by the COTP.

Sec. 154.1130  Requirements for prepositioned response equipment.

    The owner or operator of a TAPAA facility shall provide the 
following prepositioned response equipment, located within Prince 
William Sound, in addition to that required by Secs. 154.1035, 
154.1045, or 154.1050:
    (a) On-water recovery equipment with a minimum effective daily 
recovery rate of 30,000 barrels capable of being a scene within 2 hours 
of notification of a discharge.
    (b) On-water storage capacity of 100,000 barrels for recovered oily 
material capable of being on scene within 2 hours of notification of a 
discharge.
    (c) On-water recovery equipment with a minimum effective daily 
recovery rate of 40,000 barrels capable of being on scene within 18 
hours of notification of discharge.
    (d) On-water storage capacity of 300,000 barrels for recovered oily 
material capable of being on scene within 12 hours of notification of a 
discharge.
    (e) On-water recovery devices and storage equipment located in 
communities at strategic locations.
    (f) Equipment as identified below, for the locations identified in 
Sec. 154.1125(a)(1)(ii) sufficient for the protection of the 
environment in these locations:
    (1) Boom appropriate for the specific locations.
    (2) Sufficient boats to deploy boom and sorbents.
    (3) Sorbent materials.
    (4) Personnel protective clothing and equipment.
    (5) Survival equipment.
    (6) First aid supplies.
    (7) Buckets, shovels, and various other tools.
    (8) Decontamination equipment.
    (9) Shoreline cleanup equipment.
    (10) Mooring equipment.
    (11) Anchored buoys at appropriate locations to facilitate the 
positioning of defensive boom.
    (12) Other appropriate removal equipment for the protection of the 
environment as identified by the COTP.

Sec. 154.1135  Response plan development and evaluation criteria.

    The following response times must be used in determining the on 
scene arrival time in Prince William Sound for the response resources 
required by Sec. 154.1045:

------------------------------------------------------------------------
                                                Tier 1   Tier 2   tier 3
                                                (hrs.)   (hrs.)   (hrs.)
------------------------------------------------------------------------
Prince William Sound Area....................       12       24       36
------------------------------------------------------------------------

Sec. 154.1140  TAPAA facility contracting with a vessel.

    The owner or operator of a TAPAA facility may contract with a 
vessel owner or operator to meet some of all of the requirements of 
subpart G of part 155 of this chapter. The extent to which these 
requirements are met by the contractual arrangement will be determined 
by the COTP.
    4. Subpart H, consisting of Secs. 154.1210 through 154.1228, is 
added to read as follows:

Subpart H--Response Plans for Animal Fats and Vegetable Oils Facilities

Sec.
154.1210  Purpose and applicability.
154.1220  Response plan submission requirements.
154.1225  Response plan development and evaluation criteria for 
facilities that handle, store, or transport animal fats and 
vegetable oils.
154.1228  Methods of ensuring the availability of response resources 
by contract or other approved means.
Subpart H--Response Plans for Animal Fats and Vegetable Oils 
Facilities
Sec. 154.1210  Purpose and applicability.

    This subpart establishes oil spill response planning requirements 
for an owner or operator of a facility that handles, stores, or 
transports animal fats and vegetable oils. The requirements of this 
subpart are intended for use in developing response plans and 
identifying response resources during the planning process. They are 
not performance standards.

Sec. 154.1220  Response plan submission requirements.

    An owner or operator of a facility that handles, stores, or 
transports animal fats and vegetable oils shall submit a response plan 
in accordance with the requirements of this subpart, and with all 
sections of subpart F of this part, except Secs. 154.1045 and 154.1047, 
which apply to petroleum oils.

Sec. 154.1225  Response plan development and evaluation criteria for 
facilities that handle, store, or transport animal fats and vegetable 
oils.

    (a) An owner or operator of a facility that handles, stores, or 
transports animal fats and vegetable oils must provide information in 
his or her plan that identifies--
    (1) Procedures and strategies for responding to a worst case 
discharge of animal fats and vegetable oils to the maximum extent 
practicable; and
    (2) Sources of the equipment and supplies necessary to locate, 
recover, and mitigate such a discharge.
    (b) An owner or operator of a facility that handles, stores, or 
transports animal fats and vegetable oils must ensure that any 
equipment identified in a response plan is capable of operating in the 
conditions expected in the geographic area(s) in which the facility 
operates using the criteria in section 2 and Table 1 of appendix C of 
this part. When evaluating the operability of equipment, the facility 
owner or operator must consider limitations that are identified in the 
ACPs for the COTP zone in which the facility is located, including--
    (1) Ice conditions;
    (2) Debris;
    (3) Temperature ranges; and
    (4) Weather-related visibility.
    
[[Page 7932]]

    (c) The owner or operator of a facility that handles, stores, or 
transports animal fats and vegetable oils must identify the response 
resources that are available by contract or other means as described in 
Sec. 154.1228(a). The equipment identified in a response plan must 
include--
    (1) Containment boom, sorbent boom, or other methods for containing 
oil floating on the surface or to protect shorelines from impact;
    (2) Oil recovery devices appropriate for the type of animal fats or 
vegetable oils handled; and
    (3) Other appropriate equipment necessary to respond to a discharge 
involving the type of oil handled.
    (d) Response resources identified in a response plan under 
paragraph (c) of this section must be capable of commencing an 
effective on-scene response within the times specified in this 
paragraph for the applicable operating area:

------------------------------------------------------------------------
                                              Tier 1                    
                                              (hrs.)   Tier 2    Tier 3 
------------------------------------------------------------------------
Higher volume port area....................        6      N/A       N/A 
Great Lakes................................       12      N/A       N/A 
All other river and canal, inland,                                      
 nearshore, and offshore areas.............       12      N/A       N/A 
------------------------------------------------------------------------

    (e) A response plan for a facility that handles, stores, or 
transports animal fats and vegetable oils must identify response 
resources with firefighting capability. The owner or operator of a 
facility that does not have adequate firefighting resources located at 
the facility or that can not rely on sufficient local firefighting 
resources must identify and ensure, by contract or other approved means 
as described in Sec. 154.1228(a), the availability of adequate 
firefighting resources. The response plan must also identify an 
individual located at the facility to work with the fire department on 
animal fats and vegetable oil fires. This individual shall also verify 
that sufficient well-trained firefighting resources are available 
within a reasonable response time to a worst case scenario. The 
individual may be the qualified individual as defined in Sec. 154.1020 
and identified in the response plan or another appropriate individual 
located at the facility.
    (f) The response plan for a facility that is located in any 
environment with year-round preapproval for use of dispersants and that 
handles, stores, or transports animal fats and vegetable oils may 
request a credit for up to 25 percent of the worst case planning volume 
set forth by subpart F of this part. To receive this credit, the 
facility owner or operator must identify in the plan and ensure, by 
contract or other approved means as described in Sec. 154.1228(a), the 
availability of specified resources to apply the dispersants and to 
monitor their effectiveness. The extent of the credit for dispersants 
will be based on the volumes of the dispersant available to sustain 
operations at the manufacturers' recommended dosage rates. Other spill 
mitigation techniques, including mechanical dispersal, may be 
identified in the response plan provided they are in accordance with 
the NCP and the applicable ACP. Resources identified for plan credit 
should be capable of being on scene within 12 hours of a discovery of a 
discharge. Identification of these resources does not imply that they 
will be authorized for use. Actual authorization for use during a spill 
response will be governed by the provisions of the NCP and the 
applicable ACP.

Sec. 154.1228  Methods of ensuring the availability of response 
resources by contract or other approved means.

    (a) When required in this subpart, the availability of response 
resources must be ensured by the following methods:
    (1) The identification of an oil spill removal organization with 
specified equipment and personnel available within stipulated response 
times in specified geographic areas. The organization must provide 
written consent to being identified in the plan;
    (2) A document which----
    (i) Identifies the personnel, equipment, and services capable of 
being provided by the oil spill removal organization within stipulated 
response times in the specified geographic areas;
    (ii) Sets out the parties' acknowledgment that the oil spill 
removal organization intends to commit the resources in the event of a 
response;
    (iii) Permits the Coast Guard to verify the availability of the 
identified response resources through tests, inspections, and drills;
    (iv) Is referenced in the response plan;
    (3) Active membership in a local or regional oil spill removal 
organization that has identified specified personnel and equipment 
required under this subpart that are available to response to a 
discharge within stipulated response times in the specified geographic 
areas;
    (4) Certification by the facility owner or operator that specified 
personnel and equipment required under this subpart are owned, 
operated, or under the direct control of the facility owner or 
operator, and are available within stipulated response times in the 
specified geographic areas; or
    (5) A written contractual agreement with an oil spill removal 
organization. The agreement must identify and ensure the availability 
of specified personnel and equipment required under this subpart within 
stipulated response times in the specified geographic areas.
    (b) The contracts and documents required in paragraph (a) of this 
section must be retained at the facility and must be produced for 
review upon request by the COTP.
    5. Subpart I, consisting of Secs. 154.1310 through 154.1325, is 
added to read as follows:

Subpart I--Response Plans for Other Non-Petroleum Oil Facilities

Sec.
154.1310  Purpose and applicability.
154.1320  Response plan submission requirements.
154.1325  Response plan development and evaluation criteria for 
facilities that handle, store, or transport other non-petroleum 
oils.

Subpart I--Response Plans for Other Non-Petroleum Oil Facilities

Sec. 154.1310  Purpose and applicability.

    This subpart establishes oil spill response planning requirements 
for an owner or operator of a facility that handles, stores, or 
transports other non-petroleum oils. The requirements of this subpart 
are intended for use in developing response plans and identifying 
response resources during the planning process. They are not 
performance standards.

Sec. 154.1320  Response plan submission requirements.

    An owner or operator of a facility that handles, stores, or 
transports other non-petroleum oils shall submit a response plan in 
accordance with the requirements of this subpart, and with all sections 
of subpart F of this part, except Secs. 154.1045 and 154.1047, which 
apply to petroleum oils.

Sec. 154.1325  Response plan development and evaluation criteria for 
facilities that handle, store, or transport other non-petroleum oils.

    (a) An owner or operator of a facility that handles, stores, or 
transports other non-petroleum oils must provide information in his or 
her plan that identifies--
    (1) Procedures and strategies for responding to a worst case 
discharge of other non-petroleum oils to the maximum extent 
practicable; and
    (2) Sources of the equipment and supplies necessary to locate, 
recover, and mitigate such a discharge.

[[Page 7933]]

    (b) An owner or operator of a facility that handles, stores, or 
transports other non-petroleum oils must ensure that any equipment 
identified in a response plan is capable of operating in the conditions 
expected in the geographic area(s) in which the facility operates using 
the criteria in Table 1 of appendix C of this part. When evaluating the 
operability of equipment, the facility owner or operator must consider 
limitations that are identified in the ACPs for the COTP zone in which 
the facility is located, including--
    (1) Ice conditions;
    (2) Debris;
    (3) Temperature ranges; and
    (4) Weather-related visibility.
    (c) The owner or operator of a facility that handles, stores, or 
transports other non-petroleum oils must identify the response 
resources that are available by contract or other approved means as 
described in Sec. 154.1028(a). The equipment identified in a response 
plan must include--
    (1) Containment boom, sorbent boom, or other methods for containing 
oil floating on the surface or to protect shorelines from impact;
    (2) Oil recovery devices appropriate for the type of other non-
petroleum oils handled; and
    (3) Other appropriate equipment necessary to respond to a discharge 
involving the type of oil handled.
    (d) Response resources identified in a response plan under 
paragraph (c) of this section must be capable of commencing an 
effective on-scene response within the times specified in this 
paragraph for the applicable operating area:

------------------------------------------------------------------------
                                                    Tier 1   Tier   Tier
                                                    (hrs.)    2      3  
------------------------------------------------------------------------
Higher volume port area...........................       6    N/A    N/A
Great Lakes.......................................      12    N/A    N/A
All other river and canal, inland, nearshore, and                       
 offshore areas...................................      12    N/A    N/A
------------------------------------------------------------------------

    (e) A response plan for a facility that handles, stores, or 
transports other non-petroleum oils must identify response resources 
with firefighting capability. The owner or operator of a facility that 
does not have adequate firefighting resources located at the facility 
or that cannot rely on sufficient local firefighting resources must 
identify and ensure, by contract or other approved means as described 
in Sec. 154.1028(a), the availability of adequate firefighting 
resources. The response plan must also identify an individual located 
at the facility to work with the fire department on other non-petroleum 
oil fires. This individual shall also verify that sufficient well-
trained firefighting resources are available within a reasonable 
response time to a worst case scenario. The individual may be the 
qualified individual as defined in Sec. 154.1020 and identified in the 
response plan or another appropriate individual located at the 
facility.
    (f) The response plan for a facility that is located in any 
environment with year-round preapproval for use of dispersants and that 
handles, stores, or transports other non-petroleum oils may request a 
credit for up to 25 percent of the worst case planning volume set forth 
by subpart F of this part. To receive this credit, the facility owner 
or operator must identify in the plan and ensure, by contract or other 
approved means as described in Sec. 154.1028(a), the availability of 
specified resources to apply the dispersants and to monitor their 
effectiveness. The extent of the credit will be based on the volumes of 
the dispersant available to sustain operations at the manufacturers' 
recommended dosage rates. Identification of these resources does not 
imply that they will be authorized for use. Actual authorization for 
use during a spill response will be governed by the provisions of the 
NCP and the applicable ACP.
    6. Appendix C is revised to read as follows:

Appendix C--Guidelines for Determining and Evaluating Required Response 
Resources for Facility Response Plans

1. Purpose

    1.1  The purpose of this appendix is to describe the procedures 
for identifying response resources to meet the requirements of 
subpart F of this part. These guidelines will be used by the 
facility owner or operator in preparing the response plan and by the 
Captain of the Port (COTP) when reviewing them. Response resources 
identified in subparts H and I of this part should be selected using 
the guidelines in section 2 and Table 1 of this appendix.

2. Equipment Operability and Readiness

    2.1  All equipment identified in a response plan must be 
designed to operate in the conditions expected in the facility's 
geographic area. These conditions vary widely based on location and 
season. Therefore, it is difficult to identify a single stockpile of 
response equipment that will function effectively in each geographic 
location.
    2.2  Facilities handling, storing, or transporting oil in more 
than one operating environment as indicated in Table 1 of this 
appendix must identify equipment capable of successfully functioning 
in each operating environment.
    2.3  When identifying equipment for response plan credit, a 
facility owner or operator must consider the inherent limitations in 
the operability of equipment components and response systems. The 
criteria in Table 1 of this appendix should be used for evaluating 
the operability in a given environment. These criteria reflect the 
general conditions in certain operating areas.
    2.3.1  The Coast Guard may require documentation that the boom 
identified in a response plan meets the criteria in Table 1. Absent 
acceptable documentation, the Coast Guard may require that the boom 
be tested to demonstrate that it meets the criteria in Table 1. 
Testing must be in accordance with ASTM F 715, ASTM F 989, or other 
tests approved by the Coast Guard.
    2.4  Table 1 of this appendix lists criteria for oil recovery 
devices and boom. All other equipment necessary to sustain or 
support response operations in the specified operating environment 
must be designed to function in the same conditions. For example, 
boats which deploy or support skimmers or boom must be capable of 
being safely operated in the significant wave heights listed for the 
applicable operating environment.
    2.5  A facility owner or operator must refer to the applicable 
local contingency plan or ACP, as appropriate, to determine if ice, 
debris, and weather-related visibility are significant factors in 
evaluating the operability of equipment. The local contingency plan 
or ACP will also identify the average temperature ranges expected in 
the facility's operating area. All equipment identified in a 
response plan must be designed to operate within those conditions or 
ranges.
    2.6  The requirements of subparts F, G, H and I of this part 
establish response resource mobilization and response times. The 
distance of the facility from the storage location of the response 
resources must be used to determine whether the resources can arrive 
on scene within the stated time. A facility owner or operator shall 
include the time for notification, mobilization, and travel time of 
response resources identified to meet the maximum most probable 
discharge and Tier 1 worst case discharge response time 
requirements. For subparts F and G, tier 2 and 3 response resources 
must be notified and mobilized as necessary to meet the requirements 
for arrival on scene in accordance with Secs. 154.1045 or 154.1047 
of subpart F, or Sec. 154.1135 of subpart G, as appropriate. An on 
water speed of 5 knots and a land speed of 35 miles per hour is 
assumed unless the facility owner or operator can demonstrate 
otherwise.
    2.7  For subparts F and G, in identifying equipment, the 
facility owner or operator shall list the storage location, 
quantity, and manufacturer's make and model. For oil recovery 
devices, the effective daily recovery capacity, as determined using 
section 6 of this appendix must be included. For boom, the overall 
boom height (draft plus freeboard) should be included. A facility 
owner or operator is responsible for ensuring that identified boom 
has compatible connectors.
    2.8  For subparts H and I, in identifying equipment, the 
facility owner or operator shall list the storage location, 
quantity, and manufacturer's make and model. For boom, 

[[Page 7934]]
the overall boom height (draft plus freeboard) should be included. A 
facility owner or operator is responsible for ensuring that 
identified boom has compatible connectors.

3. Determining Response Resources Required for the Average Most 
Probable Discharge

    3.1  A facility owner or operator shall identify sufficient 
response resources available, through contract or other approved 
means as described in Sec. 154.1028(a), to respond to the average 
most probable discharge. The equipment must be designed to function 
in the operating environment at the point of expected use.
    3.2  The response resources must include:
    3.2.1  1,000 feet of containment boom or two times the length of 
the largest vessel that regularly conducts oil transfers to or from 
the facility, whichever is greater, and a means deploying it 
available at the spill site within 1 hour of the discovery of a 
spill.
    3.2.2  Oil recovery devices with an effective daily recovery 
capacity equal to the amount of oil discharged in an average most 
probable discharge or greater available at the facility within 2 
hours of the detection of an oil discharge.
    3.2.3  Oil storage capacity for recovered oily material 
indicated in section 9.2 of this appendix.

4. Determining Response Resources Required for the Maximum Most 
Probable Discharge

    4.1  A facility owner or operator shall identify sufficient 
response resources available, by contract or other approved means as 
described in Sec. 154.1028(a), to respond to discharges up to the 
maximum most probable discharge volume for that facility. This will 
require response resources capable of containing and collecting up 
to 1,200 barrels of oil or 10 percent of the worst case discharge, 
whichever is less. All equipment identified must be designed to 
operate in the applicable operating environment specified in Table 1 
of this appendix.
    4.2  Oil recovery devices identified to meet the applicable 
maximum most probable discharge volume planning criteria must be 
located such that they arrive on scene within 6 hours in higher 
volume port areas (as defined in 154.1020) and the Great Lakes and 
within 12 hours in all other areas.
    4.3  Because rapid control, containment, and removal of oil is 
critical to reduce spill impact, the effective daily recovery 
capacity for oil recovery devices must equal 50 percent of the 
planning volume applicable for the facility as determined in section 
4.1 of this appendix. The effective daily recovery capacity for oil 
recovery devices identified in the plan must be determined using the 
criteria in section 6 of this appendix.
    4.4  In addition to oil recovery capacity, the plan must 
identify sufficient quantities of containment boom available, by 
contract or other approved means as described in Sec. 154.1028(a), 
to arrive within the required response times for oil collection and 
containment and for protection of fish and wildlife and sensitive 
environments. While the regulation does not set required quantities 
of boom for oil collection and containment, the response plan must 
identify and ensure, by contract or other approved means as 
described in Sec. 154.1028(a), the availability of the boom 
identified in the plan for this purpose.
    4.5  The plan must indicate the availability of temporary 
storage capacity to meet the guidelines of section 9.2 of this 
appendix. If available storage capacity is insufficient to meet this 
level, then the effective daily recovery capacity must be derated to 
the limits of the available storage capacity.
    4.6  The following is an example of a maximum most probable 
discharge volume planning calculation for equipment identification 
in a higher volume port area: The facility's worst case discharge 
volume is 20,000 barrels. Ten percent of this is 2,000 barrels. 
Since this is greater than 1,200 barrels, 1,200 barrels is used as 
the planning volume. The effective daily recovery capacity must be 
50 percent of this, or 600 barrels per day. The ability of oil 
recovery devices to meet this capacity will be calculated using the 
procedures in section 6 of this appendix. Temporary storage capacity 
available on scene must equal twice the daily recovery rate as 
indicated in section 9 of this appendix, or 1,200 barrels per day. 
This is the information the facility owner or operator will use to 
identify and ensure the availability of, through contract or other 
approved means as described in Sec. 154.1028(a), the required 
response resources. The facility owner will also need to identify 
how much boom is available for use.

5. Determining Response Resources Required for the Worst Case 
Discharge to the Maximum Extent Practicable

    5.1  A facility owner or operator shall identify and ensure 
availability of, by contract or other approved means, as described 
in Sec. 154.1028(a), sufficient response resources to respond to the 
worst case discharge of oil to the maximum extent practicable. 
Section 7 of this appendix describes the method to determine the 
required response resources.
    5.2  Oil spill response resources identified in the response 
plan and available through contract or other approved means, as 
described in Sec. 154.1028(a), to meet the applicable worst case 
discharge planning volume must be located such that they can arrive 
at the scene of a discharge within the times specified for the 
applicable response tiers listed in Sec. 154.1045.
    5.3  The effective daily recovery capacity for oil recovery 
devices identified in a response plan must be determined using the 
criteria in section 6 of this appendix. A facility owner or operator 
shall identify the storage locations of all response resources that 
must be used to fulfill the requirements for each tier. The owner or 
operator of a facility whose required daily recovery capacity 
exceeds the applicable response capability caps in Table 5 of this 
appendix shall identify sources of additional equipment, their 
locations, and the arrangements made to obtain this equipment during 
a response. The owner or operator of a facility whose calculated 
planning volume exceeds the applicable contracting caps in Table 5 
shall identify sources of additional equipment equal to twice the 
cap listed in Tiers 1, 2, and 3 or the amount necessary to reach the 
calculated planning volume, whichever is lower. The resources 
identified above the cap must be capable of arriving on scene not 
later than the Tiers 1, 2, and 3 response times in Sec. 154.1045. No 
contract is required. While general listings of available response 
equipment may be used to identify additional sources, a response 
plan must identify the specific sources, locations, and quantities 
of equipment that a facility owner or operator has considered in his 
or her planning. When listing Coast Guard classified oil spill 
removal organization(s) which have sufficient removal capacity to 
recover the volume above the response capability cap for the 
specific facility, as specified in Table 5 of this appendix, it is 
not necessary to list specific quantities of equipment.
    5.4  A facility owner or operator shall identify the 
availability of temporary storage capacity to meet the requirements 
of section 9.2 of this appendix. If available storage capacity is 
insufficient to meet this requirement, then the effective daily 
recovery capacity must be derated to the limits of the availabile 
storage capacity.
    5.5  When selecting response resources necessary to meet the 
response plan requirements, the facility owner or operator must 
ensure that a portion of those resources are capable of being used 
in close-to-shore response activities in shallow water. The 
following percentages of the on-water response equipment identified 
for the applicable geographic area must be capable of operating in 
waters of 6 feet or less depth:
    (i) Offshore--10 percent
    (ii) Nearshore/inland/Great Lakes/rivers and canals--20 percent.
    5.6  In addition to oil spill recovery devices, a facility owner 
or operator shall identify sufficient quantities of boom that are 
available, by contract or other approved means as described in 
Sec. 154.1028(a), to arrive on scene within the required response 
times for oil containment and collection. The specific quantity of 
boom required for collection and containment will depend on the 
specific recovery equipment and strategies employed. A facility 
owner or operator shall also identify sufficient quantities of oil 
containment boom to protect fish and wildlife and sensitive 
environments for the number of days and geographic areas specified 
in Table 2. Sections 154.1035(b)(4)(iii) and 154.1040(a), as 
appropriate, shall be used to determine the amount of containment 
boom required, through contract or other approved means as described 
in Sec. 154.1028(a), to protect fish and wildlife and sensitive 
environments.
    5.7  A facility owner or operator must also identify, through 
contract or other approved means as described in Sec. 154.1028(a), 
the availability of an oil spill removal organization capable of 
responding to a shoreline cleanup operation involving the calculated 
volume of oil and emulsified oil that might impact the affected 
shoreline. The volume of oil that must be planned for is calculated 
through the application of factors contained in Tables 2 and 3. The 
volume 

[[Page 7935]]
calculated from these tables is intended to assist the facility owner 
or operator in identifying a contractor with sufficient resources 
and expertise. This planning volume is not used explicitly to 
determine a required amount of equipment and personnel.

6. Determining Effective Daily Recovery Capacity for Oil Recovery 
Devices

    6.1  Oil recovery devices identified by a facility owner or 
operator must be identified by manufacturer, model, and effective 
daily recovery capacity. These rates must be used to determine 
whether there is sufficient capacity to meet the applicable planning 
critieria for the average most probable discharge, maximum most 
probable discharge, and worst case discharge to the maximum extent 
practicable.
    6.2  For the purpose of determining the effective daily recovery 
capacity of oil recovery devices, the formula listed in section 
6.2.1 of this appendix will be used. This method considers potential 
limitations due to available daylight, weather, sea state, and 
percentage of emulsified oil in the recovered material. The Coast 
Guard may assign a lower efficiency factor to equipment listed in a 
response plan if it determines that such a reduction is warranted.
    6.2.1  The following formula must be used to calculate the 
effective daily recovery capacity:

R=T x 24 hours x E

R=Effective daily recovery capacity
T=Throughout rate in barrels per hour (nameplate capacity)
E=20 percent Efficiency factor (or lower factor as determined by 
Coast Guard)

    6.2.2  For those devices in which the pump limits the throughput 
of liquid, throughput rate will be calculated using the pump 
capacity.
    6.2.3  For belt or mop type devices, the throughput rate will be 
calculated using the speed of the belt or mop through the device, 
assumed thickness of oil adhering to or collected by the device, and 
surface area of the belt or mop. For purposes of this calculation, 
the assumed thickness of oil will be 1/4 inch.
    6.2.4  Facility owners or operators including oil recovery 
devices whose throughput is not measurable using a pump capacity or 
belt/mop speed may provide information to support an alternative 
method of calculation. This information must be submitted following 
the procedures in paragraph 6.3.2 of this appendix.
    6.3  As an alternative to 6.2, a facility owner or operator may 
submit adequate evidence that a different effective daily recovery 
capacity should be applied for a specific oil recovery device. 
Adequate evidence is actual verified performance data in spill 
conditions or tests using ASTM F 631, ASTM F 808, or an equivalent 
test approved by the Coast Guard.
    6.3.1  The following formula must be used to calculate the 
effective daily recovery capacity under this alternative:

R=D x U

R=Effective daily recovery capacity
D=Average Oil Recovery Rate in barrels per hour (Item 26 in ASTM F 
808; Item 13.1.15 in ASTM F 631; or actual performance data)
U=Hours per day that a facility owner or operator can document 
capability to operate equipment under spill conditions. Ten hours 
per day must be used unless a facility owner or operator can 
demonstrate that the recovery operation can be sustained for longer 
periods.

    6.3.2  A facility owner or operator proposing a different 
effective daily recovery rate for use in a response plan shall 
provide data for the oil recovery devices listed. The following is 
an example of these calculations:
    A weir skimmer identified in a response plan has a 
manufacturer's rated throughput at the pump of 267 gallons per 
minute (gpm).

267 gpm=381 barrels per hour
R=381 x 24 x .2=1829 barrels per day

    After testing using ASTM procedures, the skimmer's oil recovery 
rate is determined to be 220 gpm. The facility owner of operator 
identifies sufficient response resources available to support 
operations 12 hours per day.

220 gpm=314 barrels per hour
R=314 x 12=3768 barrels per day

    The facility owner or operator will be able to use the higher 
rate if sufficient temporary oil storage capacity is available. 
Determinations of alternative efficiency factors under paragraph 6.2 
or alternative effective daily recovery capacities under paragraph 
6.3 of this appendix will be made by Commandant, (G-MEP-6), Coast 
Guard Headquarters, 2100 Second Street SW., Washington, DC 20593. 
Response contractors or equipment manufacturers may submit required 
information on behalf of multiple facility owners or operators 
directly in lieu of including the request with the response plan 
submission.

7. Calculating the Worst Case Discharge Planning Volumes

    7.1  The facility owner or operator shall plan for a response to 
a facility's worst case discharge. The planning for on-water 
recovery must take into account a loss of some oil to the 
environment due to evaporative and natural dissipation, potential 
increases in volume due to emulsification, and the potential for 
deposit of some oil on the shoreline.
    7.2  The following procedures must be used to calculate the 
planning volume used by a facility owner or operator for determining 
required on water recovery capacity:
    7.2.1  The following must be determined: The worst case 
discharge volume of oil in the facility; the appropriate group(s) 
for the type of oil handled, stored, or transported at the facility 
(non-persistent (Group I) or persistent (Groups II, III, or IV)); 
and the facility's specific operating area. Facilities which handle, 
store, or transport oil from different petroleum oil groups must 
calculate each group separately. This information is to be used with 
Table 2 of this appendix to determine the percentages of the total 
volume to be used for removal capacity planning. This table divides 
the volume into three categories: Oil lost to the environment; oil 
deposited on the shoreline; and oil available for on-water recovery.
    7.2.2  The on-water oil recovery volume must be adjusted using 
the appropriate emulsification factor found in Table 3 of this 
appendix. Facilities which handle, store, or transport oil from 
different petroleum groups must assume that the oil group resulting 
in the largest on-water recovery volume will be stored in the tank 
or tanks identified as constituting the worst case discharge.
    7.2.3  The adjusted volume is multiplied by the on-water oil 
recovery resource mobilization favor found in Table 4 of this 
appendix from the appropriate operating area and response tier to 
determine the total on-water oil recovery capacity in barrels per 
day that must be identified or contracted for to arrive on-scene 
with the applicable time for each response tier. Three tiers are 
specified. For higher volume port areas, the contracted tiers of 
resources must be located such that they can arrive on scene within 
6, 30, and 54 hours of the discovery of an oil discharge. For all 
other river, inland, nearshore, offshore areas, and the Great Lakes, 
these tiers are 12, 36, and 60 hours.
    7.2.4  The resulting on-water recovery capacity in barrels per 
day for each tier must be used to identify response resources 
necessary to sustain operations in the applicable operating area. 
The equipment must be capable of sustaining operations for the time 
period specified in Table 2 of this appendix. The facility owner or 
operator must identify and ensure the availability, through contract 
or other approved means as described in Sec. 154.1028(a), of 
sufficient oil spill recovery devices to provide the effective daily 
recovery oil recovery capacity required. If the required capacity 
exceeds the applicable cap specified in Table 5 of this appendix, 
then a facility owner or operator shall ensure, by contract or other 
approved means as described in Sec. 154.1028(a), only for the 
quantity of resources required to meet the cap, but shall identify 
sources of additional resources as indicated in Sec. 154.1045(m). 
The owner or operator of a facility whose planning volume exceeds 
the cap for 1993 must make arrangements to identify and ensure the 
availability, through contract or other approved means as described 
in Sec. 154.1028(a), of the additional capacity in 1998 or 2003, as 
appropriate. For a facility that handles, stores, or transports 
multiple groups of oil, the required effective daily recovery 
capacity for each group is calculated before applying the cap.
    7.3  The following procedures must be used to calculate the 
planning volume for identifying shoreline cleanup capacity:
    7.3.1  The following must be determined: The worst case 
discharge volume of oil for the facility; the appropriate group(s) 
for the type of oil handled, stored, or transported at the facility 
(non-persistent (Group I) or persistent (Groups II, III, or IV)); 
and the operating area(s) in which the facility operates. For a 
facility storing oil from different groups, each group must be 
calculated separately. Using this information, Table 2 of this 
appendix must be used to determine the percentages of the total 

[[Page 7936]]
planning volume to be used for shoreline cleanup resource planning.
    7.3.2  The shoreline cleanup planning volume must be adjusted to 
reflect an emulsification factor using the same procedure as 
described in section 7.2.2.
    7.3.3  The resulting volume will be used to identify an oil 
spill removal organization with the appropriate shoreline cleanup 
capability.
    7.3.4  The following is an example of the procedure described 
above: A facility receives oil from barges via a dock located on a bay 
and transported by piping to storage tanks. The facility handles Number 
6 oil (specific gravity .96) and stores the oil in tanks where it is 
held prior to being burned in an electric generating plant. The MTR 
segment of the facility has six 18-inch diameter pipelines running one 
mile from the dock-side manifold to several storage tanks which are 
located in the non-transportation-related portion of the facility. 
Although the facility piping has a normal working pressure of 100 
pounds per square inch, the piping has a maximum allowable working 
pressure (MAWP) of 150 pounds per square inch. At MAWP, the pumping 
system can move 10,000 barrels (bbls) of Number 6 oil every hour 
through each pipeline. The facility has a roving watchman who is 
required to drive the length of the piping every 2 hours when the 
facility is receiving oil from a barge. The facility operator estimates 
that it will take approximately 10 minutes to secure pumping operations 
when a discharge is discovered. Using the definition of worst case 
discharge provided in Sec. 154.1029(b)(ii), the following calculation 
is provided:

                                                                        
                                                                   bbls.
                                                                        
2 hrs + 0.17 hour  x  10,000 bbls per hour....................    21,700
Piping volume = 37,322 ft \3\  5.6 ft \3\/bbl.........    +6,664
                                                               ---------
Discharge volume per pipe.....................................    28,364
Number of pipelines...........................................       x 6
                                                               ---------
Worst case discharge from MTR facility........................   170,184
                                                                        

    To calculate the planning volumes for onshore recovery:

Worst case discharge: 170,184 bbls. Group IV oil
Emulsification factor (from Table 3): 1.4
Operating Area impacted: Inland
Planned percent oil onshore recovery (from Table 2): Inland 70%
Planning volumes for onshore recovery: Inland 170,184  x .7  x  1.4 
= 166,780 bbls.

    Conclusion: The facility owner or operator must contract with a 
response resource capable of managing a 166,780 barrel shoreline 
cleanup.
    To calculate the planning volumes for on-water recovery:

Worst case discharge: 170,184 bbls. Group IV oil
Emulsification factor (from Table 3): 1.4
Operating Area impacted: Inland
Planned percent oil on-water recovery (from Table 2): Inland 50%
Planning volumes for on-water recovery: Inland 170,184  x  .5  x  
1.4 = 119,128 bbls.

    To determine the required resources for on-water recovery for 
each tier, use the mobilization factors from Table 4:

------------------------------------------------------------------------
                                                Tier 1   Tier 2   Tier 3
------------------------------------------------------------------------
Inland = 119,128 bbls........................    x  .1                  
                                                     5    x  .2         
                                                              5    x  .4
                                                                       0
                                              --------------------------
Barrels per day (pbd)........................   17,869   29,782   47,652
------------------------------------------------------------------------

    Conclusion: Since the requirements for all tiers for inland 
exceed the caps, the facility owner will only need to contract for 
10,000 bpd for Tier 1, 20,000 bpd for Tier 2, and 40,000 bpd for 
Tier 3. Sources for the bpd on-water recovery resources above the 
caps for all three Tiers need only be identified in the response 
plan.
    Twenty percent of the capability for Inland, for all tiers, must 
be capable of operating in water with a depth of 6 feet or less.
    The facility owner or operator will also be required to identify 
or ensure, by contract or other approved means as described in 
Sec. 154.1028(a), sufficient response resources required under 
Secs. 154.1035(b)(4) and 154.1045(k) to protect fish and wildlife 
and sensitive environments identified in the response plan for the 
worst case discharge from the facility.
    The COTP has the discretion to accept that a facility can 
operate only a limited number of the total pipelines at a dock at a 
time. In those circumstances, the worst case discharge must include 
the drainage volume from the piping normally not in use in addition 
to the drainage volume and volume of oil discharged during discovery 
and shut down of the oil discharge from the operating piping.

8. Determining the Availability of Alternative Response Methods

    8.1  Response plans for facilities that handle, store, or 
transport Groups II or III persistent oils that operate in an area 
with year-round preapproval for dispersant use may receive credit 
for up to 25 percent of their required on-water recovery capacity 
for 1993 if the availability of these resources is ensured by 
contract or other approved means as described in Sec. 154.1028(a). 
For response plan credit, these resources must be capable of being 
on-scene within 12 hours of a discharge.
    8.2  To receive credit against any required on-water recover 
capacity a response plan must identify the locations of dispersant 
stockpiles, methods of shipping to a staging area, and appropriate 
aircraft, vessels, or facilities to apply the dispersant and monitor 
its effectiveness at the scene of an oil discharge.
    8.2.1  Sufficient volumes of dispersants must be available to 
treat the oil at the dosage rate recommended by the dispersant 
manufacturer. Dispersants identified in a response plan must be on 
the NCP Product Schedule that is maintained by the Environmental 
Protection Agency. (Some states have a list of approved dispersants 
and within state waters only they can be used.)
    8.2.2  Dispersant application equipment identified in a response 
plan for credit must be located where it can be mobilized to 
shoreside staging areas to meet the time requirements in section 8.1 
of this appendix. Sufficient equipment capacity and sources of 
appropriate dispersants should be identified to sustain dispersant 
application operations for at least 3 days.
    8.2.3  Credit against on-water recovery capacity in preapproved 
areas will be based on the ability to treat oil at a rate equivalent 
to this credit. For example, a 2,500 barrel credit against the Tier 
1 10,000 barrel on-water cap would require the facility owner or 
operator to demonstrate the ability to treat 2,500 barrel/day of oil 
at the manufacturers recommended dosage rate. Assuming a dosage rate 
of 10:1, the plan would need to show stockpiles and sources of 250 
barrels of dispersants at a rate of 250 barrels per day and the 
ability to apply the dispersant at that daily rate for 3 days in the 
geographic area in which the facility is located. Similar data would 
need to be provided for any additional credit against Tier 2 and 3 
resources.
    8.3  In addition to the equipment and supplies required, a 
facility owner or operator shall identify a source of support to 
conduct the monitoring and post-use effectiveness evaluation 
required by applicable regional plans and ACPs.
    8.4  Identification of the response resources for dispersant 
application does not imply that the use of this technique will be 
authorized. Actual authorization for use during a spill response 
will be governed by the provisions of the NCP and the applicable 
regional plan or ACP. A facility owner or operator who operates a 
facility in areas with year-round preapproval of dispersant can 
reduce the required on-water recovery capacity for 1993 up to 25 
percent. A facility owner or operator may reduce the required on 
water recovery cap increase for 1998 and 2003 up to 50 percent by 
identifying pre-approved alternative response methods.
    8.5  In addition to the credit identified above, a facility 
owner or operator that operates in a year-round area pre-approved 
for dispersant use may reduce their required on water recovery cap 
increase for 1998 and 2003 by up to 50 percent by identifying non-
mechanical methods.
    8.6  The use of in-situ burning as a non-mechanical response 
method is still being studied. Because limitations and uncertainties 
remain for the use of this method, it may not be used to reduce 
required oil recovery capacity in 1993.

9. Additional Equipment Necessary to Sustain Response Operations

    9.1  A facility owner or operator is responsible for ensuring 
that sufficient numbers of trained personnel and boats, aerial 
spotting aircraft, containment boom, sorbent materials, boom 
anchoring materials, and other supplies are available to sustain 

[[Page 7937]]
response operations to completion. All such equipment must be suitable 
for use with the primary equipment identified in the response plan. 
A facility owner or operator is not required to list these response 
resources, but shall certify their availability.
    9.2  A facility owner or operator shall evaluate the 
availability of adequate temporary storage capacity to sustain the 
effective daily recovery capacities from equipment identified in the 
plan. Because of the inefficiencies of oil spill recovery devices, 
response plans must identify daily storage capacity equivalent to 
twice the effective daily recovery rate required on scene. This 
temporary storage capacity may be reduced if a facility owner or 
operator can demonstrate by waste stream analysis that the 
efficiencies of the oil recovery devices, ability to decant waste, 
or the availability of alternative temporary storage or disposal 
locations will reduce the overall volume of oily material storage 
requirement.
    9.3  A facility owner or operator shall ensure that his or her 
planning includes the capability to arrange for disposal of 
recovered oil products. Specific disposal procedures will be 
addressed in the applicable ACP.

                       Table 1.--Response Resource Operating Criteria Oil Recovery Devices                      
                                                                                                                
            Operating environment                           Significant wave height \1\               Sea State 
Rivers and Canals............................  1 Foot...................................            1
Inland.......................................  3 feet...................................            2
Great Lakes..................................  4 feet...................................          2-3
Ocean........................................  6 feet...................................          3-4
                                                      BOOM                                                      

----------------------------------------------------------------------------------------------------------------
                                                                                    Use                         
                                                         -------------------------------------------------------
                      Boom property                        Rivers and                                           
                                                             canals        Inland      Great Lakes      Ocean   
----------------------------------------------------------------------------------------------------------------
Significant Wave Height \1\.............................  1  3  4  6
Sea State...............................................             1             2           2-3           3-4
Boom height--in. (draft plus freeboard).................          6-18         18-42         18-42  4
                                                                                                               2
Reserve Buoyancy to Weight Ratio........................           2:1           2:1           2:1    3:1 to 4:1
Total Tensile Strength--lbs.............................         4,500     15-20,000     15-20,000  2
                                                                                                           0,000
Skirt Fabric Tensile Strength--lbs......................           200           300           300           500
Skirt Fabric Tear Strength--lbs.........................           100           100           100           125
----------------------------------------------------------------------------------------------------------------
\1\ Oil recovery devices and boom must be at least capable of operating in wave heights up to and including the 
  values listed in Table 1 for each operating environment.                                                      

                                                        Table 2.--Removal Capacity Planning Table                                                       
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  Spill location                            Rivers and canals           Nearshore/inland Great Lakes                Offshore            
--------------------------------------------------------------------------------------------------------------------------------------------------------
      Sustainability of on-water oil recovery                    3 Days                            4 Days                            6 Days             
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                     %                                 %                                 %              
                                                     % Natural   Recovered  % Oil on   % Natural   Recovered  % Oil on   % Natural   Recovered  % Oil on
                     Oil group                      dissipation   floating    shore   dissipation   floating    shore   dissipation   floating    shore 
                                                                    oil                               oil                               oil             
--------------------------------------------------------------------------------------------------------------------------------------------------------
1  Non-persistent oils............................          80          10        10          80          20        10          95           5         /
2  Light crudes...................................          40          15        45          50          50        30          75          25         5
3  Medium crudes and fuels........................          20          15        65          30          50        50          60          40        20
4  Heavy crudes and fuels.........................           5          20        75          10          50        70          50          40        30
--------------------------------------------------------------------------------------------------------------------------------------------------------

        Table 3.--Emulsification Factors for Petroleum Oil Groups       
------------------------------------------------------------------------
                                                                        
------------------------------------------------------------------------
Non-Persistent Oil:                                                     
  Group I........................................................    1.0
Persistent Oil:                                                         
  Group II.......................................................    1.8
  Group III......................................................    2.0
  Group IV.......................................................    1.4
------------------------------------------------------------------------

      Table 4.--On Water Oil Recovery Resource Mobilization Factors     
------------------------------------------------------------------------
                                                      Tier   Tier   Tier
                   Operating Area                      1      2      3  
------------------------------------------------------------------------
Rivers & Canals....................................    .30    .40    .60
Inland/Nearshore/Great Lakes.......................    .15    .25    .40
Offshore...........................................    .10   .165    .21
------------------------------------------------------------------------
Note: These mobilization factors are for total response resources       
  mobilized, not incremental response resources.                        

                              Table 5.--Response Capability Caps by Operating Area                              
----------------------------------------------------------------------------------------------------------------
                                           Tier 1                     Tier 2                     Tier 3         
----------------------------------------------------------------------------------------------------------------
February 18, 1993:                                                                                              
    All except rivers and        10K bbls/day.............  20K bbls/day.............  40K bbls/day/            
     canals, Great Lakes.                                                                                       
    Great Lakes................  5K bbls/day..............  10K bbls/day.............  20K bbls/day.            
    Rivers and canals..........  1,500 bbls/day...........  3,000 bbls/day...........  6,000 bbls/day.          
February 18, 1998:                                                                                              
    All except rivers and        12.5K bbls/day...........  25K bbls/day.............  50K bbls/day.            
     canals, Great Lakes.                                                                                       

[[Page 7938]]
                                                                                                                
    Great Lakes................  6.35K bbls/day...........  12.3K bbls/day...........  25K bbls/day.            
    Rivers and canals..........  1,875 bbls/day...........  3,750 bbls/day...........  7,500 bbls/day.          
February 18, 2003:                                                                                              
    All except rivers and        TBD......................  TBD......................  TBD.                     
     canals, Great Lakes.                                                                                       
    Great Lakes................  TBD......................  TBD......................  TBD.                     
    Rivers and canals..........  TBD......................  TBD......................  TBD.                     
----------------------------------------------------------------------------------------------------------------
Note: The caps show cumulative overall effective daily recovery capacity, not incremental increases.            
TBD = To be determined.                                                                                         

    7. Appendix D is revised to read as follows:

Appendix D--Training Elements for Oil Spill Response Plans

1. General

    1.1  The portion of the plan dealing with training is one of the 
key elements of a response plan. This concept is clearly expressed 
by the fact that Congress, in writing OPA 90, specifically included 
training as one of the sections required in a vessel or facility 
response plan. In reviewing submitted response plans, it has been 
noted that the plans often do not provide sufficient information in 
the training section of the plan for either the user or the reviewer 
of the plan. In some cases, plans simply state that the crew and 
others will be trained in their duties and responsibilities, with no 
other information being provided. In other plans, information is 
simply given that required parties will receive the necessary worker 
safety training (HAZWOPER).
    1.2  The training section of the plan need not be a detailed 
course syllabus, but it must contain sufficient information to allow 
the user and reviewer (or evaluator) to have an understanding of 
those areas that are believed to be critical. Plans should identify 
key skill areas and the training that is required to ensure that the 
individual identified will be capable of performing the duties 
prescribed to them. It should also describe how the training will be 
delivered to the various personnel. Further, this section of the 
plan must work in harmony with those sections of the plan dealing 
with exercises, the spill management team, and the qualified 
individual.
    1.3  The material in this appendix D is not all-inclusive and is 
provided for guidance only.

2. Elements To Be Addressed

    2.1  To assist in the preparation of the training section of a 
facility response plan, some of the key elements that should be 
addressed are indicated in the following sections. Again, while it 
is not necessary that the comprehensive training program for the 
company be included in the response plan, it is necessary for the 
plan to convey the elements that define the program as appropriate.
    2.2  An effective spill response training program should 
consider and address the following:
    2.2.1  Notification requirements and procedures.
    2.2.2  Communication system(s) used for the notifications.
    2.2.3  Procedures to mitigate or prevent any discharge or a 
substantial threat of a discharge of oil resulting from failure of 
manifold, mechanical loading arm, or other transfer equipment or 
hoses, as appropriate;
    2.2.3.1  Tank overfill;
    2.2.3.2  Tank rupture;
    2.2.3.3  Piping rupture;
    2.2.3.4  Piping leak, both under pressure and not under 
pressure, if applicable;
    2.2.3.5  Explosion or fire;
    2.2.3.6  Equipment failure (e.g., pumping system failure, relief 
valve failure, or other general equipment relevant to operational 
activities associated with internal or external facility transfers).
    2.2.4  Procedures for transferring responsibility for direction 
of response activities from facility personnel to the spill 
management team.
    2.2.5  Familiarity with the operational capabilities of the 
contracted oil spill removal organizations and the procedures to 
notify the activate such organizations.
    2.2.6  Familiarity with the contracting and ordering procedures 
to acquire oil spill removal organization resources.
    2.2.7  Familiarity with the ACP(s).
    2.2.8  Familiarity with the organizational structures that will 
be used to manage the response actions.
    2.2.9  Responsibilities and duties of the spill management team 
members in accordance with designated job responsibilities.
    2.2.10  Responsibilities and authority of the qualified 
individual as described in the facility response plan and company 
response organization.
    2.2.11  Responsibilities of designated individuals to initiate a 
response and supervise response resources.
    2.2.12  Actions to take, in accordance with designated job 
responsibilities, in the event of a transfer system leak, tank 
overflow, or suspected cargo tank or hull leak.
    2.2.13  Information on the cargoes handled by the vessel or 
facility, including familiarity with--
    2.2.13.1  Cargo material safety data sheets;
    2.2.13.2  Chemical characteristic of the cargo;
    2.2.13.3  Special handling procedures for the cargo;
    2.2.13.4  Health and safety hazards associated with the cargo; 
and
    2.2.13.5  Spill and firefighting procedures for cargo.
    2.2.14  Occupational Safety and Health Administration 
requirements for worker health and safety (29 CFR 1910.120).

3. Further Considerations

    In drafting the training section of the facility response plan, 
some further considerations are noted below (these points are raised 
simply as a reminder):
    3.1  The training program should focus on training provided to 
facility personnel.
    3.2  An organization is comprised of individuals, and a training 
program should be structured to recognize this fact by ensuring that 
training is tailored to the needs of the individuals involved in the 
program.
    3.3  An owner or operator may identify equivalent work 
experience which fulfills specific training requirements.
    3.4  The training program should include participation in 
periodic announced and unannounced exercises. This participation 
should approximate the actual roles and responsibilities of 
individual specified in the plan.
    3.5  Training should be conducted periodically to reinforce the 
required knowledge and to ensure an adequate degree of preparedness 
by individuals with responsibilities under the facility response 
plan.
    3.6  Training may be delivered via a number of different means; 
including classroom sessions, group discussions, video tapes, self-
study workbooks, resident training courses, on-the-job training, or 
other means as deemed appropriate to ensure proper instruction.
    3.7  New employees should complete the training program prior to 
being assigned job responsibilities which require participation in 
emergency response situations.

4. Conclusion

    The information in this appendix is only intended to assist 
response plan preparers in reviewing the content of and in modifying 
the training section of their response plans. It may be more 
comprehensive than is needed for some facilities and not 
comprehensive enough for others. The Coast Guard expects that plan 
preparers have determined the training needs of their organizations 
created by the development of the response plans and the actions 
identified as necessary to increase the preparedness of the company 
and its personnel to respond to actual or threatened discharges of 
oil from their facilities.

[[Page 7939]]

    Dated: February 15, 1996.
A.E. Henn,
Vice Admiral, U.S. Coast Guard, Acting Commandant.
[FR Doc. 96-4274 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-4243 Airworthiness Directives; AlliedSignal Inc. TFE731 Series Turbofan Engines
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7690-7692]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4243]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 95-ANE-54; Amendment 39-9512; AD 96-04-01]

Airworthiness Directives; AlliedSignal Inc. TFE731 Series 
Turbofan Engines

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: This amendment supersedes an existing airworthiness directive 
(AD), applicable to AlliedSignal Inc. (formerly Garrett Engine 
Division) TFE731 series turbofan engines, that currently requires eddy 
current inspection of certain fan rotor disks for cracks, and 
replacement, if necessary, with serviceable parts. This amendment 
requires reinspection of 33 additional fan rotor disks, beyond the 
quantity of reinspections required by AD 93-25-16. This amendment is 
prompted by discrepancies in several magnetic tape records discovered 
as a result of recent improvements in the inspection tape review 
process. The actions specified by this AD are intended to prevent an 
uncontained failure of the fan rotor disk due to fatigue cracking in 
the dovetail slots, which can result in inflight engine shutdowns, 
severe secondary damage, and fan rotor assembly separation from the 
engine.

DATES: Effective March 15, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of March 15, 1996.
    Comments for inclusion in the Rules Docket must be received on or 
before April 29, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), New England Region, Office of the Assistant Chief 
Counsel, Attention: Rules Docket No. 95-ANE-54, 12 New England 
Executive Park, Burlington, MA 01803-5299.
    The service information referenced in this AD may be obtained from 
AlliedSignal Aerospace, Attn: Data Distribution, M/S 64-03/2101-201, 
P.O. Box 29003, Phoenix, AZ 85038-9003; telephone (602) 365-2493, fax 
(602) 365-5577. This information may be examined at the FAA, New 
England Region, Office of the Assistant Chief Counsel, Burlington, MA; 
or at the Office of the Federal Register, 800 North Capitol Street, 
NW., suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Joseph Costa, Aerospace Engineer, Los 
Angeles Aircraft Certification Office, FAA, Transport Airplane 
Directorate, 3960 Paramount Blvd., Lakewood, CA 90712-4137; telephone 
(310) 627-5246; fax (310) 627-5210.

SUPPLEMENTARY INFORMATION: On December 21, 1993, the Federal Aviation 
Administration (FAA) issued airworthiness directive (AD) 93-25-16, 
Amendment 39-8780 (59 FR 4, January 3, 1994), applicable to 
AlliedSignal Inc. (formerly Garrett Engine Division) TFE731-2, -3, and 
-3R series turbofan engines. That AD requires eddy current inspection 
of certain fan rotor disks for cracks, and replacement, if necessary, 
of these fan rotor disks. That action was prompted by reports of an 
uncontained failure of a fan rotor disk on an Allied Signal Inc. Model 
TFE731-3 turbofan engine. The FAA investigation determined that a 
fatigue crack originated in the aft acute corner of the dovetail slot. 
The fan rotor disk had accumulated a total of 5,291 cycles in service 
(CIS) at the time of the failure, and had been eddy current inspected 
in 1990 when the disk had accumulated 4,055 CIS. The fan rotor disk 
displayed evidence of broaching grooves produced during the manufacture 
of the blade dovetail slots. These machining grooves may have 
contributed to the fan rotor disk failure. From a metallurgical 
analysis, the FAA determined that the failed fan rotor disk had 
dovetail cracks which were not detected at the time of the eddy current 
inspection. A review of the eddy current inspection process used to 
inspect this fan rotor disk and all fan rotor disks inspected prior to 
May 1991 determined that the inspection process was not acceptable. 
Those fan rotor disk cracks, if not corrected, could result in an 
uncontained failure of the fan rotor disk due to fatigue cracking in 
the dovetail slots, which can result in inflight engine shutdowns, 
severe secondary damage, and fan rotor assembly separation from the 
engine.
    After 1991, the eddy current inspection process required magnetic 
tape records (henceforth referred to as tapes) of the eddy current 
inspection 

[[Page 7691]]
results for the fan rotor disk dovetail slots. These tapes can be 
reviewed at any time following the initial inspection without 
inconveniencing the operator. Since the issuance of that AD, through 
recent improvements in the inspection tape review process, and 
continued review of the tapes, the FAA has identified several tape 
records as having discrepancies. A discrepancy does not always indicate 
that a crack exists. This superseding AD requires a re-inspection of 33 
additional fan rotor disks, beyond the quantity of reinspections 
required by AD 93-25-16, to ensure that cracked fan rotor disks are 
removed from service. To date, eddy current inspections have detected 
fatigue cracks in the dovetail slots in approximately 176 (or 4%) 
TFE731-2, -2A, -3, and -3R fan rotor disks, and those fan rotor disks 
have been removed from service.
    The FAA has reviewed and approved the technical contents of 
AlliedSignal Alert Service Bulletin (ASB) No. TFE731-A72-3578, dated 
May 31, 1995, that describes procedures for an improved, more 
definitive eddy current inspection for fan rotor disk dovetail slot 
cracks.
    Since an unsafe condition has been identified that is likely to 
exist or develop on other engines of this same type design, this AD 
supersedes AD 93-25-16 to require reinspection of 33 additional fan 
rotor disks, beyond the quantity of reinspections required by AD 93-25-
16, to ensure that cracked fan rotor disks are removed from service. 
This action is required to be accomplished in accordance with the ASB 
described previously.
    Since a situation exists that requires the immediate adoption of 
this regulation, it is found that notice and opportunity for prior 
public comment hereon are impracticable, and that good cause exists for 
making this amendment effective in less than 30 days.

Comments Invited

    Although this action is in the form of a final rule that involves 
requirements affecting flight safety and, thus, was not preceded by 
notice and an opportunity for public comment, comments are invited on 
this rule. Interested persons are invited to comment on this rule by 
submitting such written data, views, or arguments as they may desire. 
Communications should identify the Rules Docket number and be submitted 
in triplicate to the address specified under the caption ADDRESSES. All 
communications received on or before the closing date for comments will 
be considered, and this rule may be amended in light of the comments 
received. Factual information that supports the commenter's ideas and 
suggestions is extremely helpful in evaluating the effectiveness of the 
AD action and determining whether additional rulemaking action would be 
needed.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the rule that might 
suggest a need to modify the rule. All comments submitted will be 
available, both before and after the closing date for comments, in the 
Rules Docket for examination by interested persons. A report that 
summarizes each FAA-public contact concerned with the substance of this 
AD will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket Number 95- ANE-54.'' The postcard will be date stamped and 
returned to the commenter.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    The FAA has determined that this regulation is an emergency 
regulation that must be issued immediately to correct an unsafe 
condition in aircraft, and is not a ``significant regulatory action'' 
under Executive Order 12866. It has been determined further that this 
action involves an emergency regulation under DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979). If it is determined 
that this emergency regulation otherwise would be significant under DOT 
Regulatory Policies and Procedures, a final regulatory evaluation will 
be prepared and placed in the Rules Docket. A copy of it, if filed, may 
be obtained from the Rules Docket at the location provided under the 
caption ``ADDRESSES.''

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing Amendment 39-8780, (59 FR 
4, January 3, 1994), and by adding a new airworthiness directive, 
Amendment 39-9512, to read as follows:

96-04-01  AlliedSignal Inc.: Amendment 39-9512. Docket 95- ANE-54. 
Supersedes AD 93-25-16, Amendment 39-8780.

    Applicability: AlliedSignal Inc. (formerly Garrett Engine 
Division) TFE731-2, -2A, -3, -3R series turbofan engines with fan 
rotor disks, part numbers (P/N's) 3072162-1 through -4, 3073436-1 
through -4, 3073539-2, and 3074529-2, installed on, but not limited 
to: Avions Marcel Dassault Falcon 10, 50, 100 series; Learjet 31, 
35, 36 series; Lockheed-Georgia 1329-23, -25 series; Israel Aircraft 
Industries 1124 series; Raytheon British Aerospace HS125 series; and 
Sabreliner NA-265-65 aircraft.

    Note: This airworthiness directive (AD) applies to each engine 
identified in the preceding applicability provision, regardless of 
whether it has been modified, altered, or repaired in the area 
subject to the requirements of this AD. For engines that have been 
modified, altered, or repaired so that the performance of the 
requirements of this AD is affected, the owner/operator must use the 
authority provided in paragraph (e) to request approval from the 
Federal Aviation Administration (FAA). This approval may address 
either no action, if the current configuration eliminates the unsafe 
condition, or different actions necessary to address the unsafe 
condition described in this AD. Such a request should include an 
assessment of the effect of the changed configuration on the unsafe 
condition addressed by this AD. In no case does the presence of any 
modification, alteration, or repair remove any engine from the 
applicability of this AD.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent an uncontained failure of the fan rotor disk due to 
fatigue cracking in the dovetail slots, which can result in inflight 
engine shutdowns, severe secondary damage, and fan rotor assembly 
separation from the engine, accomplish the following:
    (a) No further action is required for fan rotor disks previously 
eddy current inspected in accordance with the requirements of AD 92-
26-09 and AD 93-25-16.
    (b) Remove prior to further flight fan rotor disk, P/N 3073539-2 
or 3072162-2, with Serial Number (S/N) 8-18040-6300, in accordance 
with Allied-Signal Inc. Alert Service Bulletin (ASB) No. TFE731-A72-
3504, dated November 25, 1992, or AlliedSignal Inc. ASB No. TFE731-
A72-

[[Page 7692]]
3504, Revision 1, dated July 2, 1993, and replace with a serviceable 
fan rotor disk.
    (c) Incorporate new eddy current inspection procedures in 
accordance with ASB No. TFE731-A72-3578, dated May 31, 1995, within 
30 days after the effective date of this AD. Fan rotor disks 
requiring eddy current inspection, prior to the incorporation of the 
new eddy current procedure previously mentioned, may be inspected in 
accordance with AlliedSignal Inc. ASB No TFE731-A72-3504 dated 
November 25, 1992, or TFE731-A72-3504, Revision 1, dated July 2, 
1993.
    (d) Eddy current inspect fan rotor disks, P/N 3072162-1 through 
-4, 3073436-1 through -4, 3073539-2, and 3074529-2, in accordance 
with the Accomplishment Instructions of AlliedSignal Inc. ASB No. 
TFE731-A72-3578, dated May 31, 1995, and if necessary, replace with 
a serviceable disk, as follows:
    (1) For fan rotor disks listed by S/N in Table 2 of Allied-
Signal Inc. ASB No. TFE731-A72-3504, dated November 25, 1992, or 
AlliedSignal Inc. ASB No. TFE731-A72-3504, Revision 1, dated July 2, 
1993, inspect, and if necessary, replace with a serviceable fan 
rotor disk within 50 cycles in service (CIS) after April 9, 1993 
(effective date of AD 92-26-09).
    (2) For the 10 added fan rotor disks listed by S/N in Table 3 of 
AlliedSignal Inc. ASB No. TFE731-A72-3504, Revision 1, dated July 2, 
1993, with 5,000 or more CIS since new on January 18, 1994 
(effective date of AD 93-25-16), inspect, and if necessary, replace 
with a serviceable fan rotor disk, within the next 50 CIS after 
January 18, 1994 (effective date of AD 93-25-16).
    (3) For fan rotor disks listed by S/N in Table 3 of AlliedSignal 
Inc. ASB No. TFE731-A72-3504, Revision 1, dated July 2, 1993, other 
than the 10 added fan rotor disks, with 5,000 or more CIS since new 
on April 9, 1993, (effective date of AD 92-26-09), inspect, and if 
necessary, replace with a serviceable fan rotor disk, within the 
next 50 CIS after April 9, 1993 (effective date of AD 92-26-09).
    (4) For the 10 added fan rotor disks listed by S/N in Table 3 of 
AlliedSignal Inc. ASB No. TFE731-A72-3504, Revision 1, dated July 2, 
1993, with less than 5,000 CIS since new on January 18, 1994, 
(effective date of AD 93-25-16), inspect, and if necessary, replace 
with a serviceable fan rotor disk within the next 100 CIS after 
January 18, 1994, (effective date of AD 93-25-16) or prior to 
accumulating 5,050 CIS since new, whichever occurs first.
    (5) For fan rotor disks listed by S/N in Table 3 of AlliedSignal 
Inc. ASB No. TFE731-A72-3504, Revision 1, dated July 2, 1993, other 
than the 10 added fan rotor disks, with less than 5,000 CIS since 
new on April 9, 1993 (effective date of AD 92-26-09), inspect, and 
if necessary, replace with a serviceable fan rotor disk, within the 
next 100 CIS after April 9, 1993 (effective date of AD 92-26-09), or 
prior to accumulating 5,050 CIS since new, whichever occurs first.
    (6) For fan rotor disks listed by S/N in Table 4 of AlliedSignal 
Inc. ASB No. TFE731-A72-3504, Revision 1, dated July 2, 1993, 
inspect, and if necessary, replace with a serviceable fan rotor 
disk, within the next 100 CIS after January 18, 1994, (effective 
date of AD 93-25-16).
    (7) For fan rotor disks listed by S/N in Table 1 of AlliedSignal 
Inc. ASB No. TFE731-A72-3578, dated May 31, 1995, inspect, and if 
necessary, replace with a serviceable disk, within 50 CIS after the 
effective date of this AD.
    (e) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Los Angeles Aircraft Certification 
Office. The request should be forwarded through an appropriate FAA 
Principal Maintenance Inspector, who may add comments and then send 
it to the Manager, Los Angeles Aircraft Certification Office.

    Note: Information concerning the existence of approved 
alternative methods of compliance with this airworthiness directive, 
if any, may be obtained from the Los Angeles Aircraft Certification 
Office.

    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the aircraft to a location where 
the requirements of this AD can be accomplished.
    (g) The actions required by this AD shall be done in accordance 
with the following service documents:

------------------------------------------------------------------------
         Document No.            Pages     Revision           Date      
------------------------------------------------------------------------
AlliedSignal Inc. ASB No.         1-12  Original......  May 31, 1995.   
 TFE731-A72-3578.                                                       
Total pages: 12.                                                        
Allied-Signal Inc. ASB No.        1-24  Original......  November 25,    
 TFE731-A72-3504.                                        1992.          
Total pages: 24.                                                        
Allied-Signal Inc. ASB No.        1-28  Revision 1....  July 2, 1993.   
 TFE731-A72-3504.                                                       
Total pages: 28.                                                        
------------------------------------------------------------------------

    This incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. 
Copies may be obtained from AlliedSignal Aerospace, Attn: Data 
Distribution, M/S 64-03/2101-201, P.O. Box 29003, Phoenix, AZ 85038-
9003; telephone (602) 365-2493, fax (602) 365-5577. Copies may be 
inspected at the FAA, New England Region, Office of the Assistant Chief 
Counsel, 12 New England Executive Park, Burlington, MA; or at the 
Office of the Federal Register, 800 North Capitol Street, NW., suite 
700, Washington, DC.
    (h) This amendment becomes effective on March 15, 1996.

    Issued in Burlington, Massachusetts, on February 2, 1996.
Jay J. Pardee,
Manager, Engine and Propeller Directorate, Aircraft Certification 
Service.
[FR Doc. 96-4243 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-4242 Airworthiness Directives; AlliedSignal Inc., ALF502L Series Turbofan Engines
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7692-7694]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4242]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 94-ANE-56; Amendment 39-9513; AD 96-04-02]

Airworthiness Directives; AlliedSignal Inc., ALF502L Series 
Turbofan Engines

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD), 
applicable to AlliedSignal Inc. (formerly Textron Lycoming) ALF502L 
series turbofan engines, that establishes reduced retirement life 
limits for stage 1 and stage 3-7 compressors disks, and stage 2 turbine 
disks, and provides a drawdown schedule for disks already beyond the 
reduced retirement life limits. This amendment is prompted by new life 
analyses of these components. The actions specified by this AD are 
intended to prevent disk failure, which could result in an inflight 
engine shutdown and extensive engine damage.

DATES: Effective April 29, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of April 29, 1996.

ADDRESSES: The service information referenced in this AD may be 
obtained from AlliedSignal Engines, 111 South 34th Street, Phoenix, AZ 
85072; telephone (602) 365-2493, fax (602) 365-2210. This information 
may be examined at the Federal Aviation 

[[Page 7693]]
Administration (FAA), New England Region, Office of the Assistant Chief 
Counsel, 12 New England Executive Park, Burlington, MA; or at the 
Office of the Federal Register, 800 North Capitol Street, NW., suite 
700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Eugene Triozzi, Aerospace Engineer, 
Engine Certification Office, FAA, Engine and Propeller Directorate, 12 
New England Executive Park, Burlington, MA 01803-5299; telephone (617) 
238-7148, fax (617) 238-7199.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) to include an airworthiness 
directive (AD) that is applicable to AlliedSignal Inc. (formerly 
Textron Lycoming) ALF502L series turbofan engines was published in the 
Federal Register on February 28, 1995 (60 FR 10811). That action 
proposed to establish reduced retirement life limits for stage 1 and 
stage 3-7 compressors disks, and stage 2 turbine disks, and provide a 
drawdown schedule for disks already beyond the reduced retirement life 
limits. These actions must be performed in accordance with AlliedSignal 
Engines Service Bulletin (SB) No. ALF 502 72-0004, Revision 12, dated 
November 30, 1994, that describes reduced retirement lives for affected 
components; and AlliedSignal Engines SB No. ALF502L 72-281, dated 
November 30, 1994, that describes a drawdown schedule for disks already 
beyond the reduced retirement life limits.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. No comments were received on the 
proposal or the FAA's determination of the cost to the public. The FAA 
has determined that air safety and the public interest require the 
adoption of the rule as proposed.
    There are approximately 184 engines of the affected design in the 
worldwide fleet. The FAA estimates that 50 engines installed on 
aircraft of U.S. registry will be affected by this AD, and that the 
prorated reduced service life cost based on the cost of a new disk is 
approximately $16,400 per engine. Based on these figures, the total 
cost impact of the AD on U.S. operators is estimated to be $820,000.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air Transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

94-04-02 AlliedSignal Inc.: Amendment 39-9513. Docket 94- ANE-56.

    Applicability: AlliedSignal Inc. (formerly Textron Lycoming) 
ALF502L, L-2, L-2A, L-2C, and L-3 turbofan engines installed on but 
not limited to Canadair Challenger CL600 series aircraft.

    Note: This airworthiness directive (AD) applies to each engine 
identified in the preceding applicability provision, regardless of 
whether it has been modified, altered, or repaired in the area 
subject to the requirements of this AD. For engines that have been 
modified, altered, or repaired so that the performance of the 
requirements of this AD is affected, the owner/operator must use the 
authority provided in paragraph (c) to request approval from the 
Federal Aviation Administration (FAA). This approval may address 
either no action, if the current configuration eliminates the unsafe 
condition, or different actions necessary to address the unsafe 
condition described in this AD. Such a request should include an 
assessment of the effect of the changed configuration on the unsafe 
condition addressed by this AD. In no case does the presence of any 
modification, alteration, or repair remove any engine from the 
applicability of this AD.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent disk failure, which could result in an inflight 
engine shutdown and extensive engine damage, accomplish the 
following:
    (a) Remove from service stage 1 and stage 3-7 compressor disks, 
and stage 2 turbine disks, in accordance with the drawdown schedule 
and procedures described in AlliedSignal Engines Service Bulletin 
(SB) No. ALF502L 72- 281, dated November 30, 1994.
    (b) This AD establishes new, reduced retirement life limits for 
stage 1 and stage 3-7 compressor disks, and stage 2 turbine disks, 
in accordance with AlliedSignal Engines SB No. ALF 502 72-0004, 
Revision 12, dated November 30, 1994.
    (c) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Engine Certification Office. The 
request should be forwarded through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Engine Certification Office.
    Note: Information concerning the existence of approved 
alternative methods of compliance with this airworthiness directive, 
if any, may be obtained from the Engine Certification Office.

    (d) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the aircraft to a location where 
the requirements of this AD can be accomplished.
    (e) The actions required by this AD shall be done in accordance 
with the following AlliedSignal Engines SB's:

----------------------------------------------------------------------------------------------------------------
             Document No.                Pages          Revision                           Date                 
----------------------------------------------------------------------------------------------------------------
ALF502L 72-281........................     1-4  Original...............  November 30, 1994.                     
Total pages: 4.                                                                                                 
ALF 502 72-0004.......................    1-23  12.....................  November 30, 1994.                     
Total pages: 23.                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 7694]]

    This incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. 
Copies may be obtained from AlliedSignal Engines, 111 South 34th 
Street, Phoenix, AZ 85072; telephone (602) 365-2493, fax (602) 365-
2210. Copies may be inspected at the FAA, New England Region, Office of 
the Assistant Chief Counsel, 12 New England Executive Park, Burlington, 
MA; or at the Office of the Federal Register, 800 North Capitol Street 
NW., suite 700, Washington, DC.
    (f) This amendment becomes effective on April 29, 1996.

    Issued in Burlington, Massachusetts, on February 2, 1996.
Jay J. Pardee,
Manager, Engine and Propeller Directorate, Aircraft Certification 
Service.
[FR Doc. 96-4242 Filed 2-28-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-4038 Protection of Stratospheric Ozone: Direct-Final Rulemaking Temporarily Extend the Existing Requirements
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7724-7727]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-4038]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 82

[FRL-5428-6]
RIN 2060-AF36

Protection of Stratospheric Ozone: Direct-Final Rulemaking 
Temporarily Extend the Existing Requirements

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: Through this action EPA is amending the Clean Air Act section 
608 refrigerant recycling regulations to extend the effectiveness of 
the refrigerant purity requirements of Sec. 82.154 (g) and (h), which 
are currently scheduled to expire on March 18, 1996, until December 31, 
1996, or until EPA completes rulemaking to adopt revised refrigerant 
purity requirements based on industry guidelines, whichever comes 
first. EPA is extending the requirements in response to requests from 
the air-conditioning and refrigeration industry to avoid widespread 
contamination of the stock of chlorofluorocarbon (CFC) and 
hydrochlorofluorocarbon (HCFC) refrigerants that could result from the 
lapse of the purity standard. Such contamination would cause extensive 
damage to air-conditioning and refrigeration equipment, release of 
refrigerants, and refrigerant shortages with consequent price 
increases.
    EPA anticipates, before the close of the comment period for this 
direct final, publishing a proposal to adopt a more flexible approach 
to ensuring the purity of refrigerants and soliciting public comment on 
this approach. EPA requests that readers of this notice review that 
proposal, and consider providing comments.
    This temporary extension will not result in any additional burden 
on the regulated community. Moreover, the retention of the reclamation 
requirement will protect the environment, public health, and consumers 
by ensuring that contaminated refrigerants are not vented or charged 
into equipment.

EFFECTIVE DATE: The direct final rule will become effective on April 
15, 1996 unless significant adverse comments are received by April 1, 
1996. If significant adverse comments are timely received on this 
direct final rule, EPA will withdraw the direct final rule and timely 
notice to that effect will be published in the Federal Register. All 
comments will then be addressed in a subsequent final rule based on the 
proposed rule contained in the Proposed Rules section of this Federal 
Register that is identical to this direct final rule. If no significant 
adverse comments are timely received on this direct final rule then the 
direct final rule will become effective 45 days from today's Federal 
Register notice and no further action is contemplated on the parallel 
proposal.

ADDRESSES: Comments and materials supporting this rulemaking are 
contained in Public Docket No. A-92-01, Waterside Mall (Ground Floor) 
Environmental Protection Agency, 401 M Street SW., Washington, DC 20460 
in room M-1500. Dockets may be inspected from 8:00 a.m. until 5:30 
p.m., Monday through Friday. A reasonable fee may be charged for 
copying docket materials. Those wishing to notify EPA of their intent 
to submit adverse comments on this action should contact Cindy Newberg, 
Program Implementation Branch, Stratospheric Protection Division, 
Office of Atmospheric Programs, Office of Air and Radiation (6205-J), 
401 M Street SW., Washington, DC 20460, (Docket # A-92-01 VIII.G.) 
(202) 233-9729.

FOR FURTHER INFORMATION CONTACT: Cindy Newberg, Program Implementation 
Branch, Stratospheric Protection Division, Office of Atmospheric 
Programs, Office of Air and Radiation (6205-J), 401 M Street, SW., 
Washington, DC 20460. The Stratospheric Ozone Information Hotline at 1-
800-296-1996 can also be contacted for further information.

SUPPLEMENTARY INFORMATION: The contents of this preamble are listed in 
the following outline:

I. Overview
II. Background
III. Today's Action
IV. Effective Date
V. Summary of Supporting Analysis

I. Overview

    Paragraphs 82.154(g) and (h) of 40 CFR part 82, subpart F set 
requirements for sale of used refrigerant, mandating that it meet 
certain purity standards. These requirements will expire on March 18, 
1996. EPA is currently in the process of promulgating new, more 
flexible, requirements based on industry guidelines, but will be unable 
to complete the rulemaking prior to the expiration of the existing 
standards. A lapse in the standards could result in widespread 
contamination of the stock of CFC and HCFC refrigerants. Such 
contamination would cause extensive damage to air-conditioning and 
refrigeration equipment, release of refrigerants, and refrigerant 
shortages with consequent price increases. Release of CFC and HCFC 
refrigerants has been found to deplete stratospheric ozone, resulting 
in increased human and environmental exposure to ultraviolet radiation. 
Increased exposure to ultraviolet radiation in turn can lead to serious 
health and environmental effects.
    EPA is acting on requests from the air-conditioning and 
refrigeration industry to extend the effectiveness of the current 
refrigerant purity requirements, only until EPA can complete rulemaking 
to adopt more flexible requirements that will still ensure refrigerant 
purity.

II. Background

    On May 14, 1993, EPA published final regulations establishing a 
recycling program for ozone-depleting refrigerants recovered during the 
servicing and disposal of air-conditioning and refrigeration equipment 
(58 FR 28660). These regulations include evacuation requirements for 
appliances being serviced or disposed of, standards and testing 
requirements for used refrigerant sold to a new owner, certification 
requirements for refrigerant reclaimers, and standards and testing 
requirements for refrigerant recycling and recovery equipment. 

[[Page 7725]]

    When EPA promulgated the final rule, the Agency noted that further 
rulemaking would be required to address issues that had been raised 
during the comment period for the proposed rule (57 FR 58644). One of 
these issues was whether a standard for used refrigerant could be 
developed that would protect air-conditioning and refrigeration 
equipment, but would allow technicians to clean refrigerant themselves, 
rather than sending the refrigerant to an off-site reclaimer.
    The final rule published on May 14, 1993, requires that refrigerant 
sold to a new owner be reclaimed to the ARI Standard 700 of purity by a 
certified reclaimer (Sec. 82.154(g) and (h) referencing standard in 
Sec. 82.164 and the definition of reclaim found in Sec. 82.152). As 
discussed in the final rule, this requirement protects the purity of 
used refrigerant to prevent damage to air-conditioning and 
refrigeration equipment from the use of contaminated refrigerant. 
Equipment damage from contaminated refrigerant would result in costs to 
equipment owners, in releases of refrigerant from damaged equipment 
through increased leakage, servicing and replacement, and in reduction 
in consumer confidence in the quality of used refrigerant. This 
reduction in consumer confidence could lead to the premature retirement 
or retrofit of CFC or HCFC equipment since consumers would no longer 
believe that a sufficient stock of trustworthy refrigerants was 
available.
    Although the reclamation requirements contained in 82.154(g) and 
(h) would clearly protect equipment, EPA believed that a more flexible 
but as effective requirement should be developed, particularly for 
refrigerant transferred between owners whose equipment was similar and 
was serviced by the same contractor. However, the only existing 
standard at the time EPA promulgated the rule was ARI Standard 700, and 
the only agreed upon means of enforcing it was by limiting sale of used 
refrigerant to only certified reclaimers. Certified reclaimers, unlike 
contractors or technicians, are required to have the equipment 
available that can verify that the refrigerant meets the purity 
standards, thus ensuring its purity prior to selling the refrigerants.
    In order to encourage industry to explore the possibility of 
developing more flexible but still effective standards and technologies 
for purifying refrigerant, as well as more flexible means for ensuring 
compliance with purity standards, EPA adopted a commenter's suggestion 
and established an expiration date, or ``sunset,'' for the reclamation 
requirement. EPA accordingly made the reclamation requirements at 
Sec. 82.154 (g) and (h) effective until May 15, 1995, two years after 
publication of the final rule. EPA believed that this two-year period 
would be sufficient for industry to develop new guidelines for reuse of 
refrigerant and for EPA to complete a rulemaking to adopt them if EPA 
determined that they would continue to reduce emissions to the lowest 
achievable level and maximize the recapture and recycling of 
refrigerants (58 FR 28679).
    In December, 1994, a committee representing a wide range of 
interests within the air-conditioning and refrigeration industry 
published Industry Recycling Guide (IRG-2): Handling and Reuse of 
Refrigerants in the United States. This document establishes 
requirements and recommendations for the reuse of refrigerant in a 
number of different situations, including refrigerant transfers on the 
open market and between equipment owned by different people but 
serviced by the same contractor. Because EPA believes that these 
requirements would protect air-conditioning and refrigeration equipment 
while permitting technicians, contractors, and equipment owners more 
flexibility than the current requirements, EPA began pursuing a 
rulemaking to adopt the IRG-2 requirements. However, because the 
original sunset date was approaching, EPA also pursued a rulemaking to 
extend the effectiveness of Sec. 82.154(g) and (h) (60 FR 14608). That 
rulemaking extended the effectiveness of the provisions until March 18, 
1996. EPA believed that this extension would provide sufficient 
opportunity to develop and publish a proposed rule, take public 
comment, and develop and publish a final rule.
    EPA drafted a proposed rulemaking concerning the adoption of a more 
flexible approach for ensuring refrigerant purity. However, several 
events beyond the agency's control have delayed the EPA's ability to 
release this proposal. While EPA expects to publish the proposal in the 
Federal Register prior to the end of the comment period for this direct 
final rulemaking, EPA will not have an opportunity to consider comments 
and promulgate a final action concerning the IRG-2 requirements prior 
to the expiration of these provisions on March 18, 1996.
    Representatives of the air-conditioning and refrigeration industry 
expressed concern that any lapse in refrigerant purity requirements 
could result in a number of problems, including sloppy handling of 
refrigerant and dumping of contaminated refrigerant on the market. 
These problems would result in significant damage to equipment, release 
of refrigerant, and aggravated refrigerant shortages.
    Currently, the reclamation requirement encourages careful handling 
of refrigerant, because refrigerant that is irretrievably contaminated 
(for instance through mixture with other refrigerants) will not be 
accepted by any reclaimer, rendering it worthless. If this check is 
removed, sloppy handling may become widespread. This would not only 
lead to damage to equipment, but to the permanent loss of part of the 
stock of pure refrigerant through refrigerant mixture. Even in the best 
case in which the mixed refrigerant was properly disposed of, the 
limited supply of refrigerant would thereby be further reduced, 
necessitating more retrofit or replacement of existing equipment. 
Unfortunately, it is likely that the mixed refrigerant would often be 
used in air-conditioning and refrigeration equipment or vented rather 
than disposed of properly.
    The possibility of widespread dumping of refrigerant on the market 
has been raised by reports that contractors and ``recyclers'' are 
stockpiling used refrigerant. In some cases, dumping dirty refrigerant 
on the market might be attractive simply because it enables the seller 
of refrigerant to avoid the costs of reclamation; for others, it might 
be attractive because the refrigerant is unreclaimable and therefore 
worthless if analyzed or sent to a reclaimer. In either situation, such 
dumping would lead to widespread equipment damage and potential 
releases of refrigerant. In addition, since domestic CFC production 
ceased December 31, 1995, protecting the purity of the existing stock 
of CFC refrigerants is essential.

III. Today's Action

    In response to these concerns, EPA is extending the effectiveness 
of the current reclamation requirements until the Agency can adopt 
replacement requirements. It was never EPA's intent to leave air-
conditioning and refrigeration equipment and refrigerant supplies 
unprotected by a purity standard, but only to replace the existing 
standard with a more flexible standard when that was developed. As 
discussed above, EPA is currently undertaking rulemaking to adopt a 
more flexible standard. 

[[Page 7726]]

IV. Summary of Supporting Analysis

A. Executive Order 12866

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether this regulatory action is ``significant'' 
and therefore subject to OMB review and the requirements of the 
Executive Order. The Order defines ``significant'' regulatory action as 
one that is likely to lead to a rule that may:
    (1) Have an annual effect on the economy of $100 million or more, 
or adversely and materially affect a sector of the economy, 
productivity, competition, jobs, the environment, public health or 
safety, or State, local, or tribal governments or communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    It has been determined by OMB and EPA that this action to amend the 
final rule is not a ``significant regulatory action'' under the terms 
of Executive Order 12866 and is therefore not subject to OMB review 
under the Executive Order.

B. Unfunded Mandates Act

    Section 202 of the Unfunded Mandates Reform Act of 1995 (``Unfunded 
Mandates Act'') requires that the Agency prepare a budgetary impact 
statement before promulgating a rule that includes a Federal mandate 
that may result in expenditure by State, local, and tribal governments, 
in aggregate, or by the private sector, of $100 million or more in any 
one year. Section 203 requires the Agency to establish a plan for 
obtaining input from and informing, educating, and advising any small 
governments that may be significantly or uniquely affected by the rule.
    Under section 205 of the Unfunded Mandates Act, the Agency must 
identify and consider a reasonable number of regulatory alternatives 
before promulgating a rule for which a budgetary impact statement must 
be prepared. The Agency must select from those alternatives the least 
costly, most cost-effective, or least burdensome alternative that 
achieves the objectives of the rule, unless the Agency explains why 
this alternative is not selected or the selection of this alternative 
is inconsistent with law.
    Because this rulemaking is estimated to result in the expenditure 
by State, local, and tribal governments or private sector of less than 
$100 million in any one year, the Agency has not prepared a budgetary 
impact statement or specifically addressed the selection of the least 
costly, most cost-effective, or least burdensome alternative. Because 
small governments will not be significantly or uniquely affected by 
this rule, the Agency is not required to develop a plan with regard to 
small governments. As discussed in this preamble, this rule merely 
extends the current reclamation requirements during consideration of a 
more flexible approach that may result in reducing the burden of part 
82 Subpart F of the Stratospheric Protection regulations on regulated 
entities, including State, local, and tribal governments or private 
sector entities.

C. Paperwork Reduction Act

    There are no additional information collection requirements 
associated with this rulemaking. EPA has determined that the Paperwork 
Reduction Act does not apply. The initial Sec. 608 final rulemaking did 
address all recordkeeping associated with the refrigerant purity 
provisions. An Information Collection Request (ICR) document was 
prepared by EPA and approved by the Office of Management and Budget 
(OMB) under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. This 
ICR is contained in the public docket A-92-01.

D. Regulatory Flexibility Act

    The Regulatory Flexibility Act, 5 U.S.C. 601-602, requires that 
Federal agencies examine the impacts of their regulations on small 
entities. Under 5 U.S.C. 604(a), whenever an agency is required to 
publish a general notice of proposed rulemaking, it must prepare and 
make available for public comment an initial regulatory flexibility 
analysis (RFA). Such an analysis is not required if the head of an 
agency certifies that a rule will not have a significant economic 
impact on a substantial number of small entities, pursuant to 5 U.S.C. 
605(b).
    EPA believes that since this amendment merely extends a current 
requirement designed to protect purity of refrigerants temporarily, 
there will be no adverse effects for the regulated community, including 
small entities. An examination of the impacts of these provisions was 
discussed in the initial final rule promulgated under Sec. 608 (58 FR 
28660). That final rule assessed the impact the rule may have on small 
entities. A separate regulatory impact analysis was developed. That 
impact analysis accompanied the final rule and is contained in Docket 
A-92-01.
    I certify that this amendment to the refrigerant recycling rule 
will not have any additional negative economic impacts on any small 
entities.

List of Subjects in 40 CFR Part 82

    Environmental protection, Administrative practice and procedure, 
Air pollution control, Chemicals, Chlorofluorocarbons, 
Hydrochlorofluorocarbons, Interstate commerce, Reporting and 
reclamation, recordkeeping requirements, refrigerant purity, recycling, 
Stratospheric ozone layer.

    Dated: February 14, 1996.
Carol M. Browner,
Administrator.

    Part 82, chapter I, title 40, of the Code of Federal Regulations, 
is amended to read as follows:

PART 82--PROTECTION OF STRATOSPHERIC OZONE

    1. The authority citation for part 82 continues to read as follows:

    Authority: 42 U.S.C. 7414, 7601, 7671-7671q.

    2. Section 82.154 is amended by revising paragraphs (g) and (h) to 
read as follows:

Sec. 82.154  Prohibitions.

* * * * *
    (g) Effective until December 31, 1996, no person may sell or offer 
for sale for use as a refrigerant any class I or class II substance 
consisting wholly or in part of used refrigerant unless:
    (1) The class I or class II substance has been reclaimed as defined 
at Sec. 82.152;
    (2) The class I or class II substance was used only in an MVAC or 
MVAC-like appliance and is to be used only in an MVAC or MVAC-like 
appliance; or
    (3) The class I or class II substance is contained in an appliance 
that is sold or offered for sale together with the class I or class II 
substance.
    (h) Effective until December 31, 1996, no person may sell or offer 
for sale for use as a refrigerant any class I or class II substance 
consisting wholly or in part of used refrigerant unless:
    (1) The class I or class II substance has been reclaimed by a 
person who has been certified as a reclaimer pursuant to Sec. 82.164;
    (2) The class I or class II substance was used only in an MVAC or 
MVAC-like appliance and is to be used only in an MVAC or MVAC-like 
appliance; or
    (3) The class I or class II substance is contained in an appliance 
that is sold or 

[[Page 7727]]
offered for sale together with the class I or class II substance.
* * * * *
[FR Doc. 96-4038 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-3718 Washington; Final Authorization of State Hazardous Waste Management Program Revisions
[Federal Register Volume 61, Number 41 (Thursday, February 29, 1996)]
[Rules and Regulations]
[Pages 7736-7737]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-3718]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 271

[FRL-5423-2]

Washington; Final Authorization of State Hazardous Waste 
Management Program Revisions

AGENCY: Environmental Protection Agency.

ACTION: Immediate final rule.

-----------------------------------------------------------------------

SUMMARY: The State of Washington has applied for final authorization of 
revisions to its hazardous waste program under the Resource 
Conservation and Recovery Act (RCRA). The Environmental Protection 
Agency (EPA) has reviewed Washington's application and has made a 
decision, subject to public review and comment, that Washington's 
hazardous waste program revision satisfies all of the requirements 
necessary to qualify for final authorization. Thus, EPA intends to 
approve Washington's hazardous waste program revisions. Washington's 
application for program revision is available for public review and 
comment.

DATES: Final authorization for the State of Washington shall be 
effective April 29, 1996, unless EPA publishes a prior Federal Register 
action withdrawing this immediate final rule. All comments on the State 
of Washington's program revision application must be received by the 
close of business April 1, 1996.

ADDRESSES: Copies of the State of Washington's program revision 
application are available during normal business hours at the following 
addresses for inspection and copying: U.S. Environmental Protection 
Agency, Region 10, Library, 1200 Sixth Avenue, Seattle WA 98101, 
contact: (206) 553-1259; Washington Department of Ecology, 300 Desmond 
Drive, Lacey WA 98503, contact: Patricia Hervieux, (360) 407-6756; 
Washington Department of Ecology, Eastern Region, N. 4601 Monroe, Suite 
100, Spokane WA 99205, contact: Jim Malm, (509) 456-2725. Written 
comments should be sent to Patricia Springer, U. S. Environmental 
Protection Agency, Region 10, HW-105, 1200 Sixth Avenue, Seattle WA 
98101, Phone (206) 553-2858.

FOR FURTHER INFORMATION CONTACT: Patricia Springer, U. S. Environmental 
Protection Agency, Region 10, HW-105, 1200 Sixth Avenue, Seattle WA 
98101, Phone (206) 553-2858.

SUPPLEMENTARY INFORMATION:

Background

    States with final authorization under Section 3006(b) of the 
Resource Conservation and Recovery Act (``RCRA or ``the Act''), 42 
U.S.C. 6929(b), have a continuing obligation to maintain a hazardous 
waste program that is equivalent to, consistent with, and no less 
stringent than the Federal hazardous waste program. In addition, as an 
interim measure, the Hazardous and Solid Waste Amendments of 1984 
(Public Law 98-616, November 8, 1984, hereinafter ``HSWA'') allows 
States to revise their programs to become substantially equivalent 
instead of equivalent to RCRA requirements promulgated under HSWA 
authority. States exercising the latter option receive ``interim 
authorization'' for the HSWA requirements under Section 3006(g) of 
RCRA, 42 U.S.C. 6926(g), and later apply for final authorization for 
the HSWA requirements.
    Revisions to State hazardous waste programs are necessary when 
federal or state statutory or regulatory authority is modified or when 
certain other changes occur. Most commonly, state program revisions are 
necessitated by changes to EPA's regulations in 40 CFR Parts 124, 260-
266, 268, 270 and 279.

State of Washington

    The State of Washington initially received final authorization on 
January 31, 1986. Washington also received authorization for revisions 
to its program on November 23, 1987 (52 FR 35556, 9/22/87), October 16, 
1990 (55 FR 33695, 8/17/90), and November 4, 1994 (59 FR 55322, 11/4/
94). On November 9, 1995, Washington submitted a program revision 
application for additional program approvals. Today, Washington is 
seeking approval of its program revision in accordance with 40 CFR 
271.21(b)(3). 

[[Page 7737]]

    EPA has reviewed Washington's application, and has made an 
immediate final decision that the State's hazardous waste program 
revision satisfies all of the requirements necessary to qualify for 
final authorization. Consequently, EPA intends to grant final 
authorization for the additional program modifications to Washington's 
hazardous waste program. The public may submit written comments on 
EPA's immediate final decision up until (insert date at least 30 
calendar days after date of publication in Federal Register). Copies of 
the State of Washington's application for program revision are 
available for inspection and copying at the locations indicated in the 
Addresses section of this notice.
    Approval of the State of Washington's program revision shall become 
effective in 60 days unless an adverse comment pertaining to the 
State's revision discussed in this notice is received by the end of the 
comment period. If an adverse comment is received EPA will publish 
either (1) A withdrawal of the immediate final decision or (2) a notice 
containing a response to comments which either affirms that the 
immediate final decision takes effect or reverses the decision.
    The State of Washington has requested authorization for the 
following federal rules:

Non-HSWA Rules:
    Hazardous Waste Storage and Treatment Tank Systems, 51 FR 25422, 7/
14/86 (CL 28);
    Listing of Commercial Chemical Products and Appendix VIII 
Constituents--Correction, 51 FR 28296, 8/6/86 (CL 29);
    Revised Manual SW-846, 52 FR 8072, 3/16/87 (CL 35);
    Hazardous Waste Tank Systems--Correction, 51 FR 29430, 8/15/86 (CL 
28);
    Closure/Post-Closure Care for Interim Status Surface Impoundments, 
52 FR 8704, 3/19/87 (CL 36);
    Definition of Solid Waste--Technical Correction, 52 FR 21306, 6/5/
87 (CL 37);
    HW Constituents for Ground Water Monitoring (Phase I), 52 FR 25942, 
7/9/87 (CL 40);
    Listing of Hazardous Waste--Container/Inner Liner Correction, 52 FR 
26012, 7/10/87 (CL 41);
    Liability Requirements for HW Facilities--Corporate Guarantee, 52 
FR 44314, 11/18/87 (CL 43);
    Miscellaneous Units, 52 FR 46946, 12/10/87 (CL 45);
    Technical Correction--Listing of Hazardous Waste, 53 FR 13382, 4/
22/88 (CL 46);
    Treatability Studies Sample Exemption, 53 FR 27290, 7/19/88 (CL 
49);
    Storage and Treatment Tank Systems, 53 FR 34079, 9/2/88 (CL 52);
    Listing of Primary Metal Smelter Wastes--Spent Pot Liner, 53 FR 
35412, 9/13/88 (CL 53);
    Permit Modifications for HW Management Facilities, 53 FR 37912, 9/
28/88 and 53 FR 41649, 10/24/88 (CL 54);
    Statistical Methods for Evaluating Ground Water Monitoring Data, 53 
FR 39720, 10/11/88 (CL 55);
    Hazardous Waste Miscellaneous Units, 54 FR 615, 1/9/89 (CL 59);
    Incinerator Permits, 54 FR 4286, 1/30/89 (CL 60);
    Changes to Interim Status Facilities & Modifications to HW 
Management Permits; Procedures for Post-Closure Permitting, 54 FR 9596, 
3/7/89 (CL 61).
HSWA Rules:
    Dioxin Waste Listings, 50 FR 1978, 1/14/85 (CL 14);
    Paint Filter Test, 50 FR 18370, 4/30/85 (CL 16);
    Research and Development Permits, 50 FR 28702, 7/15/85 (CL 17Q);
    Used Oil and HW Burned as Fuels, 50 FR 49164, 11/29/85 and 52 FR 
11819, 4/13/87 (CL 19);
    Small Quantity Generator Requirements, 51 FR 10146, 3/24/86 (CL 
23);
    Codification Rule, Technical Correction, 51 FR 19176, 5/28/86 (CL 
25);
    Listing of EBDC, 51 FR 37725, 10/24/86 (CL 33);
    Toxicity Characteristic Revisions, 55 FR 11798, 3/29/90 and 55 FR 
26986, 6/29/90 (CL 74).

The CL numbers reference regulation-specific checklists in the 
application which identify the specific federal regulation citation and 
the state regulation analog.
    Some portions of Washington's revised program are broader in scope 
than the federal program, and thus are not federally enforceable. This 
action does not authorize the identified broader in scope provisions. 
Some portions of Washington's revised program are more stringent than 
the federal program. This action makes these more stringent provisions 
a part of the federally authorized RCRA program. Both the broader in 
scope and more stringent provisions are identified in the Checklists 
and discussed in the Attorney General's Statement accompanying the 
application.

Indian Lands

    Washington is not seeking authorization to operate on Indian lands.

Decision

    I conclude that the State of Washington's program revision 
application meets all of the statutory and regulatory requirements 
established by RCRA. Accordingly, Washington is granted final 
authorization to operate its hazardous waste program as revised. 
Washington now has responsibility for permitting treatment, storage, 
and disposal facilities within its borders and carrying out the aspects 
of the RCRA program described in its revised program application, 
subject to the limitations of the HSWA. The State of Washington also 
has primary enforcement responsibilities, although EPA retains the 
right to conduct inspections under Section 3007 of RCRA, 42 U.S.C. 
6927, and to take enforcement actions under Sections 3008, 3013 and 
7003 of RCRA, 42 U.S.C. 6928, 6934, and 6973.

Compliance With Executive Order 12866

    The Office of Management and Budget has exempted this rule from the 
requirements of Section 6 of Executive Order 12866.

Certification Under the Regulatory Flexibility Act

    Pursuant to the provisions of 4 U.S.C. 605(b), I hereby certify 
that this authorization will not have a significant economic impact on 
a substantial number of small entities. This authorization effectively 
suspends the applicability of certain Federal regulations in favor of 
the State of Washington's program, thereby eliminating duplicative 
requirements for handlers of hazardous waste in the State. It does not 
impose any new burdens on small entities. This rule, therefore, does 
not require a regulatory flexibility analysis.

Authority

    This notice is issued under the authority of Sections 2002(a), 3006 
and 7004(b) of the Solid Waste Disposal Act as amended 42 U.S.C. 
6912(a), 6926, 6974(b).

    Dated` February 8, 1996.
Chuck Clarke,
Regional Administrator.
[FR Doc. 96-3718 Filed 2-28-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.