Federal Register final rules — 1996-05-17

issue-1996-05-17Federal Register final rules — 1996-05-17Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-12497 Airworthiness Directives; Jetstream Aircraft Limited (Formerly British Aerospace, Regional Airlines Limited) HP137 Mk1, Jetstream Series 200, and Jetstream Model 3101 Airplanes
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24884-24887]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12497]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-CE-79-AD; Amendment 39-9627; AD 96-11-02]
RIN 2120-AA64

Airworthiness Directives; Jetstream Aircraft Limited (Formerly 
British Aerospace, Regional Airlines Limited) HP137 Mk1, Jetstream 
Series 200, and Jetstream Model 3101 Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD) that 
applies to Jetstream Aircraft Limited (JAL) HP137 Mk1, Jetstream series 
200, and Jetstream Model 3101 airplanes. This action requires 
repetitively inspecting the spigot housing plate for cracks at the 
wing/fuselage forward attachment sliding joint, replacing any cracked 
housing plate, repetitively inspecting the spigots and spigot posts for 
corrosion and installing improved spigots if corrosion is found that 
exceeds certain limits, and eventually installing improved spigots if 
corrosion that does not exceed certain limits is found. For certain 
affected airplanes, this action requires repetitively inspecting the 
spigot bushes for migration gaps, replacing the bushes with modified 
bushes if gaps are found that exceed 0.5 inch, and eventually replacing 
the bushes with modified bushes if migration gaps are not found. 
Reports of bush migration gaps found on three of the affected airplanes 
and another report of corrosion and several cracks found on the spigot 
housing plate on a Jetstream Model 3101 airplane prompted this action. 
The actions specified by this AD are intended to prevent structural 
failure of the wing/fuselage area caused by a cracked or corroded 
spigot housing assembly.

DATES: Effective July 2, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of July 2, 1996.

ADDRESSES: Service information that applies to this AD may be obtained 
from Jetstream Aircraft Limited, Prestwick International Airport, 
Ayrshire, KA9 2RW, Scotland, telephone (44-292) 79888; facsimile (44-
292) 79703; or Jetstream Aircraft Inc., Librarian, P.O. Box 16029, 
Dulles International Airport, Washington, D.C. 20041-6029; telephone 
(703) 406-1161; facsimile (703) 406-1469. This information may also be 
examined at the Federal Aviation Administration (FAA), Central Region, 
Office of the Assistant Chief Counsel, Attention: Rules Docket 95-CE-
79-AD, Room 1558, 601 E. 12th Street, Kansas City, Missouri 64106; or 
at the Office of the Federal Register, 800 North Capitol Street NW., 
suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Ms. Dorenda Baker, Program Manager, 
Brussels Aircraft Certification Office, FAA, Europe, Africa, and Middle 
East Office, c/o American Embassy, B-1000 Brussels, Belgium; telephone 
(32 2) 508.2715; facsimile (32 2) 230.6899; or Mr. Jeffrey Morfitt, 
Project Officer, Small Airplane Directorate, Aircraft Certification 
Service, FAA, 1201 Walnut, suite 900, Kansas City, Missouri 64105; 
telephone (816) 426-6932; facsimile (816) 426-2169.

SUPPLEMENTARY INFORMATION:

Events Leading to the AD

    A proposal to amend part 39 of the Federal Aviation Regulations (14 
CFR part 39) to include an AD that would apply to JAL HP137 Mk1, 
Jetstream series 200, and Jetstream Model 3101 airplanes was published 
in the Federal Register on January 19, 1996 (61 FR

[[Page 24885]]

1295). The action proposed to require repetitively inspecting the 
spigot housing plate for cracks at the wing/fuselage forward attachment 
sliding joint, replacing any cracked housing plate, repetitively 
inspecting the spigots and spigot posts for corrosion and installing 
improved spigots if corrosion is found, and eventually installing 
improved spigots if corrosion is not found. For certain affected 
airplanes, the proposed action would require repetitively inspecting 
the spigot bushes for migration gaps, replacing the bushes with 
modified bushes if gaps are found that exceed 0.5 inch, and eventually 
replacing the bushes with modified bushes if migration gaps are not 
found. Accomplishment of the proposed inspections would be in 
accordance with BAe Jetstream Alert Service Bulletin (ASB) 57-A-JA 
920640, dated February 19, 1993; and Jetstream Service Bulletin (SB) 
57-JA 930941, Revision 2, dated November 11, 1994. Accomplishment of 
the proposed modifications would be in accordance with BAe Jetstream SB 
57-JM 5259, dated February 5, 1993, and Erratum No. 1 to SB 57-JM 5259, 
dated February 8, 1993; and Jetstream SB 57-JM 5326, dated September 3, 
1993.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received from two different commenters. One of these 
commenters supports the proposal as written.

Comment Resolution

    JAL states that the corrosion limits specified in paragraphs (b)(1) 
and (b)(2) of the AD only specify the spigot posts. JAL further states 
that Jetstream SB 57-JA 930941, Revision No. 2, dated November 11, 
1994, also specifies corrosion limits for the spigots. JAL requests 
that these corrosion limits and applicable service bulletin 
instructions be added to the final rule. The FAA concurs and has 
revised the AD accordingly.
    JAL also recommends that the repetitive inspection interval be 
changed to 48 calendar months instead of 12 calendar months to coincide 
with Jetstream SB 57-JA 93041. The FAA established the initial 
inspection in the proposal at 12 calendar months and meant to establish 
the repetitive inspection interval at 48 calendar months, but 
inadvertently established the repetitive inspection interval at 12 
calendar months. The FAA's analysis of data initially submitted by JAL 
indicates that repetitively inspecting the spigot housing area for 
cracks and corrosion at 48 calendar month intervals provides the level 
of safety necessary to correct the unsafe condition. The final rule AD 
has been revised to reflect this change.
    JAL asks whether an owner/operator who found a cracked spigot 
housing plate could apply for an alternative method of compliance to 
allow 150 flight hours before installation rather than prior to further 
flight when a crack is found that is shorter than 0.2 inch. JAL states 
that this would allow the owner/operator of the affected airplane time 
to obtain the necessary parts, and also states that fatigue tests have 
demonstrated slow crack growth. The FAA allows any owner/operator to 
submit a request for an alternative method of compliance, including an 
extension of the compliance time. The owner/operator should submit the 
request with all substantiating data in accordance with the provisions 
in the AD. The FAA will evaluate each request to determine whether the 
alternative method of compliance establishes an equivalent level of 
safety to the actions of the AD, and then will either approve or reject 
the request accordingly.
    No comments were received regarding the FAA's estimate of the cost 
impact on the public.
    After careful review of all available information related to the 
subject presented above, the FAA has determined that air safety and the 
public interest require the adoption of the rule as proposed except for 
the changes previously discussed and minor editorial corrections. The 
FAA has determined that these changes and minor corrections will not 
change the meaning of the AD and will not add any additional burden 
upon the public than was already proposed.

Aspects of the Action

    The alternative to incorporating new modified spigots and bushes 
would be to require repetitive inspections. FAA aging commuter-class 
aircraft policy states that reliance on critical repetitive inspections 
carries an unnecessary safety risk when a design change exists that 
could eliminate or, in certain instances, reduce the number of those 
critical inspections. Therefore, the required spigot and bush 
replacements is consistent with the FAA's commuter-class aircraft 
policy.
    The compliance times of the repetitive inspections of the spigots 
and spigot posts for corrosion and subsequent replacement, if 
necessary, are presented in calendar time instead of hours time-in-
service (TIS). Corrosion can occur on airplanes regardless of whether 
the airplane is in service or in storage. Therefore, to ensure that 
corrosion is detected and corrected on all airplanes within a 
reasonable period of time without inadvertently grounding any 
airplanes, a compliance schedule based upon calendar time instead of 
hours TIS is utilized.

Cost Impact

    The FAA estimates that 143 airplanes in the U.S. registry will be 
affected by this AD, that it will take approximately 61 workhours per 
airplane to accomplish the inspections and modifications, and that the 
average labor rate is approximately $60 an hour. Parts cost 
approximately $320 per airplane. Based on these figures, the total cost 
impact of this AD on U.S. operators is estimated to be $569,140 or 
$3,980 per airplane. This figure only takes into account the cost of 
initial inspections and does not take into account repetitive 
inspection costs. The FAA has no way of determining the number of 
repetitive inspections each affected airplane owner/operator will incur 
over the life of the airplane.
    The approximately 61 workhours it will take to accomplish the 
required actions is based on each inspection and modification being 
accomplished separately. The FAA anticipates that many owners/operators 
of the affected airplanes will schedule all of the required actions to 
be accomplished at the same time, thereby reducing the labor costs 
associated with accomplishing these actions.
    In addition, Jetstream Aircraft Limited has informed the FAA that 
parts have been distributed to equip approximately 40 airplanes. 
Assuming that each set of parts is installed on an affected HP137 Mk1, 
Jetstream series 200, or Jetstream Model 3101 airplane, the cost impact 
of this AD upon U.S. operators is reduced $159,200 from $569,140 to 
$409,940.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a

[[Page 24886]]

substantial number of small entities under the criteria of the 
Regulatory Flexibility Act. A copy of the final evaluation prepared for 
this action is contained in the Rules Docket. A copy of it may be 
obtained by contacting the Rules Docket at the location provided under 
the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding a new airworthiness directive 
(AD) to read as follows:

96-11-02   Jetstream Aircraft Limited: Amendment 39-9627; Docket No. 
95-CE-79-AD.

    Applicability: HP137 Mk1, Jetstream series 200, and Jetstream 
Model 3101 airplanes (all serial numbers), certificated in any 
category.
    Compliance: Required as indicated in the body of this AD, unless 
already accomplished.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (g) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    To prevent structural failure of the wing/fuselage area caused 
by a cracked spigot housing assembly, accomplish the following:
    (a) For all affected airplanes, upon the accumulation of 7,200 
hours time-in-service (TIS) or within the next 1,200 hours TIS after 
the effective date of this AD, whichever occurs later, and 
thereafter at intervals not to exceed 7,200 hours TIS, accomplish 
the following:
    (1) Inspect the spigot housing plate at the wing/fuselage 
forward attachment sliding joint for cracks in accordance with Part 
1 of the ACCOMPLISHMENT INSTRUCTIONS section of Jetstream Service 
Bulletin (SB) 57-JA 930941, Revision No. 2, dated November 11, 1994.
    (2) If a cracked spigot housing plate is found, prior to further 
flight, replace the cracked spigot housing plate in accordance with 
Part 3 of the ACCOMPLISHMENT INSTRUCTIONS section of Jetstream SB 
57-JA 930941, Revision No. 2, dated November 11, 1994.
    (3) Replacing the spigot housing plate does not eliminate the 
7,200-hour TIS interval repetitive inspection requirement.
    (b) For all affected airplanes, within the next 12 calendar 
months after the effective date of this AD, and thereafter at 
intervals not to exceed 48 calendar months until Modification No. JM 
5326 and Modification No. JM 5259 (as applicable) are incorporated 
as required by paragraphs (d)(1) and (d)(2) of this AD, inspect the 
spigots and spigot posts for corrosion in accordance with Part 2 of 
the ACCOMPLISHMENT INSTRUCTIONS section of Jetstream SB 57-JA 
930941, Revision No. 2, dated November 11, 1994.
    (1) If corrosion damage is found in the spigot post that is 0.06 
inch (1.52 mm) or less deep and does not extend to within 0.9 inch 
(22.9 mm) from either end of the bore, prior to further flight, 
treat the corrosion in accordance with paragraph (8)(d) of the 
ACCOMPLISHMENT INSTRUCTIONS section of Jetstream SB 57-JA 930941, 
Revision No. 2, dated November 11, 1994.
    (2) If corrosion damage in the spigot post is found that is more 
than 0.06 inch (1.52 mm) or extends to within 0.9 inch (22.9 mm) 
from either end of the bore, prior to further flight, obtain a 
repair scheme from the manufacturer through the Brussels Aircraft 
Certification Office (ACO) at the address specified in paragraph (g) 
of this AD, and incorporate this repair scheme.
    (3) If corrosion damage in the spigot is found that penetrates 
the protective surface of the spigot, within four calendar months 
after finding the corrosion damage, replace both wing/fuselage 
spigots with new modified spigots (Modification No. JM 5326) in 
accordance with Jetstream SB 57-JM 5326, dated September 3, 1993. 
Modification No. JM 5326 incorporates a new P/N 13781B401 spigot 
assembly.
    (c) For all affected HP137 Mk1 airplanes and all affected 
Jetstream series 200 airplanes, and Jetstream Model 3101 airplanes 
with a serial number in the range of 601 through 702 (inclusive), 
within the next 1,200 hours TIS after the effective date of this AD, 
inspect the wing/fuselage forward attachment spigot bushes for 
migration gaps in accordance with the ACCOMPLISHMENT INSTRUCTIONS 
section of BAe Jetstream Alert SB 57-A-JA 920640, dated February 19, 
1993.
    (1) If no migration gaps are found, reinspect at intervals not 
to exceed 4,500 hours TIS until Modification No. JM 5259 is 
incorporated. If migration gaps are found upon reinspection, install 
modified bushes as specified in paragraph (c)(2) or (c)(3) of this 
AD.
    (2) If migration gaps are found that are 0.5 inch or less, 
reinspect at intervals not to exceed 900 hours TIS until 
Modification No. JM 5259 is incorporated. If migration gaps are 
found upon reinspection that are larger than .5 inch, accomplish 
paragraph (c)(3) of this AD, as applicable.
    (3) If migration gaps are found that are larger than 0.5 inch, 
within 150 hours TIS after the last inspection required by paragraph 
(c)(1) or (c)(2) of this AD, install modified bushes at the wing/
fuselage forward attachment spigots (Modification JM 5259) in 
accordance with the ACCOMPLISHMENT INSTRUCTIONS section of BAe 
Jetstream SB 57-JM 5259, dated February 5, 1993, and Erratum No. 1 
to SB 57-JM 5259, dated February 8, 1993.
    (d) Upon accumulating 25,000 hours TIS or within 1,000 hours TIS 
after the effective date of this AD, whichever occurs later, 
accomplish the following:
    (1) For all affected HP137 Mk1, Jetstream series 200, and 
Jetstream Model 3101 airplanes, replace both wing/fuselage spigots 
with new modified spigots (Modification No. JM 5326) in accordance 
with Jetstream SB 57-JM 5326, dated September 3, 1993; and
    (2) For all affected HP137 Mk1 airplanes and all affected 
Jetstream series 200 airplanes, and Jetstream Model 3101 airplanes 
with a serial number in the range of 601 through 702 (inclusive), 
install modified bushes at the wing/fuselage forward attachment 
spigots (Modification No. JM 5259) in accordance with the 
ACCOMPLISHMENT INSTRUCTIONS section of BAe Jetstream SB 57-JM 5259, 
dated February 5, 1993, and Erratum No. 1 to SB 57-JM 5259, dated 
February 8, 1993.
    (3) Incorporating Modification No. JM 5259 eliminates the 
requirement of repetitively inspecting the wing/fuselage forward 
attachment spigot bushes for migration gaps as required by all 
designations of paragraph (c) of this AD.
    (e) Incorporating both Modification No. JM 5326 and Modification 
No. JM 5259 eliminates the repetitive inspections required by all 
designations of paragraphs (b) and (c) of this AD. This does not 
eliminate the repetitive inspections of the spigot housing plate as 
required by paragraph (a) of this AD.
    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (g) An alternative method of compliance or adjustment of the 
initial or repetitive compliance times that provides an equivalent 
level of safety may be approved by the Manager, Brussels Aircraft 
Certification Office (ACO), Europe, Africa, Middle East office, FAA, 
c/o American Embassy, 1000 Brussels, Belgium. The request should be 
forwarded through an appropriate FAA Maintenance Inspector, who may 
add comments and then send it to the Manager, Brussels ACO.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Brussels ACO.

    (h) The inspections required by this AD shall be done in 
accordance with BAe Jetstream Alert Service Bulletin 57-A-JA 920640, 
dated February 19, 1993; and

[[Page 24887]]

Jetstream Service Bulletin 57-JA 930941, Revision 2, dated November 
11, 1994. The modifications required by this AD shall be done in 
accordance with BAe Jetstream Service Bulletin 57-JM 5259, dated 
February 5, 1993, and Erratum No. 1 to Service Bulletin 57-JM 5259, 
dated February 8, 1993; and Jetstream Service Bulletin 57-JM 5326, 
dated September 3, 1993. This incorporation by reference was 
approved by the Director of the Federal Register in accordance with 
5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from 
Jetstream Aircraft Limited, Manager Product Support, Prestwick 
Airport, Ayrshire, KA9 2RW Scotland; or Jetstream Aircraft Inc., 
Librarian, P.O. Box 16029, Dulles International Airport, Washington, 
DC, 20041-6029. Copies may be inspected at the FAA, Central Region, 
Office of the Assistant Chief Counsel, Room 1558, 601 E. 12th 
Street, Kansas City, Missouri, or at the Office of the Federal 
Register, 800 North Capitol Street NW., suite 700, Washington, DC.
    (i) This amendment (39-9627) becomes effective on July 2, 1996.

    Issued in Kansas City, Missouri, on May 10, 1996.
Michael Gallagher,
Manager, Small Airplane Directorate, Aircraft Certification Service.
[FR Doc. 96-12497 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12496 Airworthiness Directives; Jetstream Aircraft Limited; Jetstream Models 3101 and 3201 Airplanes
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24883-24884]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12496]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-CE-18-AD; Amendment 39-9626; AD 96-11-01]
RIN 2120-AA64

Airworthiness Directives; Jetstream Aircraft Limited; Jetstream 
Models 3101 and 3201 Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD) that 
applies to Jetstream Aircraft Limited (JAL) Jetstream Models 3101 and 
3201 airplanes. This action requires modifying the automatic airframe 
de-ice system to allow the wing and tail de-ice boots to automatically 
operate through one cycle. The present system repeats the wing de-ice 
boot inflation cycle before starting to inflate the tail de-ice boots. 
Reports of ice accumulating on the tail faster than the automatic tail 
de-ice boots inflate on the affected airplanes prompted this action. 
The actions specified by this AD are intended to prevent excessive ice 
accretion on the tail or wings of the affected airplanes, which could 
result in loss of control of the airplane.

DATES: Effective July 2, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of July 2, 1996.

ADDRESSES: Service information that applies to this AD may be obtained 
from Jetstream Aircraft Limited, Prestwick International Airport, 
Ayrshire, KA9 2RW, Scotland, telephone (44-292) 79888; facsimile (44-
292) 79703; or Jetstream Aircraft Inc., Librarian, P.O. Box 16029, 
Dulles International Airport, Washington, D.C. 20041-6029; telephone 
(703) 406-1161; facsimile (703) 406-1469. This information may also be 
examined at the Federal Aviation Administration (FAA), Central Region, 
Office of the Assistant Chief Counsel, Attention: Rules Docket 95-CE-
18-AD, Room 1558, 601 E. 12th Street, Kansas City, Missouri 64106; or 
at the Office of the Federal Register, 800 North Capitol Street NW., 
suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Ms. Dorenda Baker, Program Manager, 
Brussels Aircraft Certification Office, FAA, Europe, Africa, and Middle 
East Office, c/o American Embassy, B-1000 Brussels, Belgium; telephone 
(32 2) 508.2715; facsimile (32 2) 230.6899; or Mr. Jeffrey Morfitt, 
Project Officer, Small Airplane Directorate, Aircraft Certification 
Service, FAA, 1201 Walnut, suite 900, Kansas City, Missouri 64105; 
telephone (816) 426-6932; facsimile (816) 426-2169.

SUPPLEMENTARY INFORMATION:

Events Leading to the AD

    A proposal to amend part 39 of the Federal Aviation Regulations (14 
CFR part 39) to include an AD that would apply to JAL Jetstream Models 
3101 and 3201 airplanes was published in the Federal Register on 
February 21, 1996 (61 FR 6583). The action proposed to require 
modifying the automatic airframe de-ice system to allow the wing and 
tail de-ice boot systems to automatically operate through one cycle. 
Accomplishment of the proposed modification would be in accordance with 
Jetstream Service Bulletin 30-JK 12033, Revision No. 1, dated October 
20, 1995.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the one comment received.

Comment Resolution

    The commenter supports the proposal, but recommends that the final 
rule not become effective until after May 1, 1996. The commenter 
explains that this is necessary to ensure parts delivery and subsequent 
scheduling of the modification within the compliance time. The issuance 
of this AD is well after May 1, 1996, and the subsequent effective date 
of the final rule gives this commenter ample time to accomplish the 
modification.
    No comments were received regarding the FAA's determination of the 
cost impact on the public.
    After careful review of all available information related to the 
subject presented above, the FAA has determined that air safety and the 
public interest require the adoption of the rule as proposed except for 
minor editorial corrections. The FAA has determined that these minor 
corrections will not change the meaning of the AD and will not add any 
additional burden upon the public than was already proposed.

Cost Impact

    The FAA estimates that 260 airplanes in the U.S. registry will be 
affected by this AD, that it will take approximately 5 workhours per 
airplane to accomplish the required action, and that the average labor 
rate is approximately $60 an hour. Parts cost approximately $50 per 
airplane. Based on these figures, the total cost impact of the AD on 
U.S. operators is estimated to be $91,000. This figure is based on the 
assumption that no owner/operator of the affected airplanes has 
accomplished the required modification.
    Jetstream has informed the FAA that parts have been distributed to 
owners/operators to equip approximately 22 of the affected airplanes. 
Assuming that each set of parts is installed on an affected airplane, 
the cost impact of this AD upon U.S. owners/operators of the affected 
airplanes is reduced $7,700 from $91,000 to $83,300.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) Is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A copy of the final evaluation prepared for this 
action is contained in the Rules Docket. A copy of it may be obtained 
by contacting the

[[Page 24884]]

Rules Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding a new airworthiness directive 
(AD) to read as follows:

96-11-01  Jetstream Aircraft Limited: Amendment 39-9626; Docket No. 
95-CE-18-AD.

    Applicability: Jetstream Models 3101 and 3201 airplanes (all 
serial numbers), certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (c) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required within the next 1,000 hours time- in-
service after the effective date of this AD, unless already 
accomplished.
    To prevent excessive ice accretion on the tail or wings of the 
affected airplanes, which could result in loss of control of the 
airplane, accomplish the following:
    (a) Modify the automatic airframe de-ice system in accordance 
with the ACCOMPLISHMENT INSTRUCTIONS section of Jetstream Service 
Bulletin No. 30-JK 12033, Revision No. 1, dated October 20, 1995.
    (b) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (c) An alternative method of compliance or adjustment of the 
compliance time that provides an equivalent level of safety may be 
approved by the Manager, Brussels Aircraft Certification Office 
(ACO), Europe, Africa, Middle East office, FAA, c/o American 
Embassy, B-1000 Brussels, Belgium. The request should be forwarded 
through an appropriate FAA Maintenance Inspector, who may add 
comments and then send it to the Manager, Brussels ACO.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Brussels ACO.

    (d) The inspections required by this AD shall be done in 
accordance with Jetstream Service Bulletin No. 30-JK 12033, Revision 
No. 1, dated October 20, 1995. This incorporation by reference was 
approved by the Director of the Federal Register in accordance with 
5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from 
Jetstream Aircraft Limited, Manager Product Support, Prestwick 
Airport, Ayrshire, KA9 2RW Scotland; or Jetstream Aircraft Inc., 
Librarian, P.O. Box 16029, Dulles International Airport, Washington, 
DC, 20041-6029. Copies may be inspected at the FAA, Central Region, 
Office of the Assistant Chief Counsel, Room 1558, 601 E. 12th 
Street, Kansas City, Missouri, or at the Office of the Federal 
Register, 800 North Capitol Street NW., suite 700, Washington, DC.
    (e) This amendment (39-9626) becomes effective on July 2, 1996.

    Issued in Kansas City, Missouri, on May 10, 1996.
Michael Gallagher,
Manager, Small Airplane Directorate, Aircraft Certification Service.
[FR Doc. 96-12496 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12485 National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24894-24895]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12485]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300

[FRL-5507-3]

National Oil and Hazardous Substances Pollution Contingency Plan 
National Priorities List

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of deletion of the A.L. Taylor Superfund Site, Brooks, 
Kentucky from the National Priorities List.

-----------------------------------------------------------------------

SUMMARY: The U.S. Environmental Protection Agency (EPA) announces the 
deletion of the A.L. Taylor Superfund Site in Brooks, Kentucky, from 
the National Priorities List (NPL) (Appendix B of 40 CFR Part 300 which 
is the National Oil and Hazardous Substances Pollution Contingency Plan 
(NCP)). EPA and the Commonwealth of Kentucky have determined that all 
appropriate Fund-financed responses under the Comprehensive 
Environmental Response, Compensation and Liability Act (CERCLA), as 
amended, have been implemented and that no further cleanup is 
appropriate. Moreover, EPA and the Commonwealth of Kentucky determined 
that response actions

[[Page 24895]]

conducted at the site to date have been protective of public health, 
welfare, and the environment. This deletion does not preclude future 
action under Superfund.

EFFECTIVE DATE: June 1, 1996.

FOR FURTHER INFORMATION CONTACT: Liza Montalvo, Remedial Project 
Manager, U.S. Environmental Protection Agency, Region 4, North 
Superfund Remedial Branch, 345 Courtland Street NE., Atlanta, GA 30365, 
(404) 347-7791, extension 2030.

SUPPLEMENTARY INFORMATION: The site to be deleted from the NPL is: A.L. 
Taylor Superfund Site, Brooks, Kentucky.
    A Notice of Intent to Delete for this site was published in July, 
1988. A Revised Notice of Intent to Delete was published on March 8, 
1996 (FRL-5436-8). The closing date for comments on the Revised Notice 
of Intent to Delete was April 17, 1996. EPA received no comments.
    EPA identifies sites that appear to present a significant risk to 
public health, welfare, or the environment and it maintains the NPL as 
the list of those sites. Any site deleted from the NPL remains eligible 
for Fund-financed remedial actions in the unlikely event that 
conditions at the site warrant such action in the future. Section 
300.425(e)(3) of the NCP states that Fund-financed actions may be taken 
at sites deleted from the NPL. Deletion of a site from the NPL does not 
affect responsible party liability or impede agency efforts to recover 
costs associated with response efforts.
List of Subjects in 40 CFR Part 300
    Environmental protection, Air pollution control, Chemicals, 
Hazardous waste, Hazardous substances, Intergovernmental relations, 
Penalties, Reporting and recorkeeping requirements, Superfund, Water 
pollution control, Water supply.

    Dated: May 6, 1996.
A. Stanley Meiburg,
Acting Regional Administrator, USEPA Region 4.

    For reasons set out in the preamble, 40 CFR part 300 is amended as 
follows:
PART 300--[AMENDED]
    1. The authority citation for part 300 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 
12777, 56 FR 54757; 3 CFR 1991 Comp., p. 351; E.O. 12580, 52 FR 
2923; 3 CFR, 1987 Comp., p. 193.
Appendix B to Part 300--[Amended]
    2. Table 1 of Appendix B to part 300 is amended by removing the 
site A.L. Taylor, Brooks, Kentucky.

[FR Doc. 96-12485 Filed 5-16-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-12473 Scope of Rules: Prevention of Acts of Violence and Terrorism
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 25120-25121]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12473]

[[Page 25119]]

_______________________________________________________________________

Part VI

Department of Justice

_______________________________________________________________________

Bureau of Prisons

_______________________________________________________________________

28 CFR Parts 501 and 550

Scope of Rules: Prevention of Acts of Violence and Terrorism and Drug 
Abuse Treatment Programs: Early Release Consideration; Final Rules

Federal Register / Vol. 61, No. 97 / Friday, May 17, 1996 / Rules and 
Regulations

[[Page 25120]]

DEPARTMENT OF JUSTICE

Bureau of Prisons

28 CFR Part 501

[BOP-1059-I]
RIN 1120-AA54

Scope of Rules: Prevention of Acts of Violence and Terrorism

AGENCY: Bureau of Prisons, Justice.

ACTION: Interim rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: This document amends Bureau of Prisons regulations on 
institutional management with respect to special administrative 
measures that may be necessary to prevent acts of violence and 
terrorism that may be caused by contacts with certain inmates. The 
affected inmate must be notified in writing as promptly as possible of 
the restrictions to be imposed. Restrictions may be imposed initially 
for up to 120 days, and may be extended in further increments of 120 
days only upon additional written notification that the circumstances 
identified in the original certification continue to exist.

DATES: This rule shall take effect May 17, 1996; comments must be 
submitted by July 16, 1996.

ADDRESSES: Office of General Counsel, Bureau of Prisons, HOLC Room 754, 
320 First Street, NW., Washington, DC 20534.

FOR FURTHER INFORMATION CONTACT: Roy Nanovic, Office of General 
Counsel, Bureau of Prisons, phone (202) 514-6655.

SUPPLEMENTARY INFORMATION: The Bureau of Prisons (``Bureau'') is 
adopting interim regulations on the correctional management of inmates 
whose contacts with other persons present the potential for acts of 
violence and terrorism. Under these interim regulations, the Warden may 
implement administrative measures that are reasonably necessary to 
protect the public against such acts. Application of these measures is 
likely to affect only a minute portion of the inmate population; those 
inmates for whom there is an identified concern that the inmate's 
communications with other persons could serve as an instrumentality for 
acts of violence and terrorism. These measures will be subject to 
strict controls, as their implementation may occur only upon written 
notification by the Attorney General, the head of a federal law 
enforcement agency, or the head of a member agency of the United States 
intelligence community, that there is a substantial risk that a 
prisoner's communications or contacts with persons could result in 
death or serious bodily injury to persons, or substantial damage to 
property that would entail the risk of death or serious bodily injury 
to persons.
    It is not the intention of the Bureau that the restrictions imposed 
in these special cases routinely include complete curtailment of 
privileges. An inmate upon whom these special restrictions are imposed 
is entitled to notification in writing of the imposed restrictions and 
the basis for the restrictions. The affected inmate may appeal 
imposition of restrictions ordered under this section through the 
Bureau's Administrative Remedy Program, 28 CFR part 542.
    The Bureau is publishing this regulation as an interim rule under 
the ``good cause'' provision of 5 U.S.C. 553(b) in order to protect the 
public interest and to protect against the risk of acts of violence and 
terrorism. Members of the public may submit comments concerning this 
rule by writing to the previously cited address. These comments will be 
considered before the rule is finalized.
    The Bureau of Prisons has determined that this rule is not a 
significant regulatory action for the purpose of E.O. 12866, and 
accordingly this rule was not reviewed by the Office of Management and 
Budget. After review of the law and regulations, the Director, Bureau 
of Prisons, has certified that this rule, for the purpose of the 
Regulatory Flexibility Act (Pub. L. 96-354), does not have a 
significant economic impact on a substantial number of small entities. 
This rule will not have substantial direct effects on the states, on 
the relationship between the national government and the states, or the 
distribution of power and responsibilities among the various levels of 
government. Therefore, in accordance with section 6 of E.O. 12612, it 
is determined that this rule does not have sufficient federalism 
implications to warrant the preparation of a Federalism Assessment.

List of Subjects in 28 CFR Part 501

    Prisoners.
Kathleen M. Hawk,
Director, Bureau of Prisons.

    Accordingly, pursuant to the rulemaking authority vested in the 
Attorney General in 5 U.S.C. 552(a) and delegated to the Director, 
Bureau of Prisons, in 28 CFR 0.96(p), part 501 in subchapter A of 28 
CFR, chapter V is amended as set forth below:

SUBCHAPTER A--GENERAL MANAGEMENT AND ADMINISTRATION

PART 501--SCOPE OF RULES

    1. The authority citation for 28 CFR part 501 continues to read as 
follows:

    Authority: 5 U.S.C. 301; 18 U.S.C. 3621, 3622, 3624, 4001, 4042, 
4081, 4082 (Repealed in part as to offenses committed on or after 
November 1, 1987), 4161-4166 (Repealed as to offenses committed on 
or after November 1, 1987), 5006-5024 (Repealed October 12, 1984 as 
to offenses committed after that date), 5039; 28 U.S.C. 509, 510; 28 
CFR 0.95-0.99.

    2. Section 501.3 is added to part 501 to read as follows:

Sec. 501.3  Prevention of acts of violence and terrorism.

    (a) Upon direction of the Attorney General, the Director, Bureau of 
Prisons, may authorize the Warden to implement special administrative 
procedures that are reasonably necessary to protect persons against the 
risk of death or serious bodily injury. These procedures may be 
implemented upon written notification to the Director, Bureau of 
Prisons, by the Attorney General or, at the Attorney General's 
direction, by the head of a federal law enforcement agency, or the head 
of a member agency of the United States intelligence community, that 
there is a substantial risk that a prisoner's communications or 
contacts with persons could result in death or serious bodily injury to 
persons, or substantial damage to property that would entail the risk 
of death or serious bodily injury to persons. These special 
administrative measures ordinarily may include housing the inmate in 
administrative detention and/or limiting certain privileges, including, 
but not limited to, correspondence, visiting, interviews with 
representatives of the news media, and use of the telephone, as is 
reasonably necessary to protect persons against the risk of acts of 
violence or terrorism. The authority of the Director under this 
paragraph may not be delegated below the level of Acting Director.
    (b) Designated staff shall provide to the affected inmate, as soon 
as practicable, written notification of the restrictions imposed and 
the basis for these restrictions. The notice's statement as to the 
basis may be limited in the interest of prison security or safety or to 
protect against acts of violence or terrorism. The inmate shall sign 
for and receive a copy of the notification.
    (c) Initial placement of an inmate in administrative detention and/
or any limitation of the inmate's privileges in

[[Page 25121]]

accordance with paragraph (a) of this section may be imposed for up to 
120 days. Special restrictions imposed in accordance with paragraph (a) 
of this section may be extended thereafter by the Director, Bureau of 
Prisons, in 120-day increments upon receipt by the Director of 
additional written notification from the Attorney General, or, at the 
Attorney General's direction, from the head of a federal law 
enforcement agency, or the head of a member agency of the United States 
intelligence community, that the circumstances identified in the 
original notification continue to exist. The authority of the Director 
under this paragraph may not be delegated below the level of Acting 
Director.
    (d) The affected inmate may seek review of any special restrictions 
imposed in accordance with paragraph (a) of this section through the 
Administrative Remedy Program, 28 CFR part 542.

[FR Doc. 96-12473 Filed 5-16-96; 8:45 am]
BILLING CODE 4410-05-P

Complete official Federal Register PDF

FR Doc. 96-12472 Drug Abuse Treatment Programs: Early Release Consideration
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 25121-25122]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12472]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF JUSTICE

Bureau of Prisons

28 CFR Part 550

[BOP-1052-I]
RIN 1120-AA36

Drug Abuse Treatment Programs: Early Release Consideration

AGENCY: Bureau of Prisons, Justice.

ACTION: Further issuance of interim rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: In this document, the Bureau of Prisons is further amending 
its interim rule on Drug Abuse Treatment Programs which allows for 
consideration of early release of eligible inmates who complete a 
residential drug abuse treatment program, including a transitional 
treatment phase. Based upon initial public comment, the Bureau is 
adding to the interim regulations a requirement that an inmate seeking 
consideration for early release must complete transitional drug 
treatment services in a community-based program (i.e., in a Community 
Corrections Center or on home confinement). This further amendment is 
necessary to solicit additional comments from the public on this new 
requirement.

DATES: Effective May 17, 1996; comments are due July 16, 1996.

ADDRESSES: Office of General Counsel, Bureau of Prisons, HOLC Room 754, 
320 First Street NW., Washington, DC 20534.

FOR FURTHER INFORMATION CONTACT: Roy Nanovic, Office of General 
Counsel, Bureau of Prisons, phone (202) 514-6655.

SUPPLEMENTARY INFORMATION: The Bureau of Prisons is further amending 
its regulations on Drug Abuse Treatment Programs (28 CFR part 550, 
subpart F). An interim rule on this subject which implemented Section 
32001 of the Violent Crime Control and Law Enforcement Act of 1994 
(codified at 18 U.S.C. 3621(e)) was published in the Federal Register 
on May 25, 1995 (60 FR 27692).
    Public comment received on the interim rule, published May 25, 
1995, included comment from the American Psychiatric Association 
(Association). The Association stated that it believed the program was 
a good idea, but expressed concern about the adequacy of transitional 
drug treatment services offered at an institution. Bureau regulations 
in 28 CFR 550.59(a) require minimum participation of one hour per month 
for such transitional services. The Association stated that this 
minimum was probably not of sufficient intensity to facilitate a good 
outcome and recommended enhanced psychiatric consultation and the 
availability of a broad array of services.
    The Bureau recognizes the importance of transitional services in 
drug treatment programming and agrees with the Association that an 
enhanced transitional program, such as is available in a community-
based program, increases the opportunity for a good outcome. The Bureau 
recognizes that implementation of this requirement may preclude some 
inmates from participation in a community-based program. However, while 
the Bureau may be able to increase the availability of certain 
transitional services at an institution, it cannot duplicate within the 
institution the environment of community-based transitional services 
(i.e., the evaluation of the inmate in conditions where the inmate is 
reintegrating into the community). The Bureau, in exercising its 
discretion in determining the successful completion of a residential 
drug abuse treatment program under 18 U.S.C. 3621(e), is therefore 
requiring that consideration for early release be contingent upon the 
inmate's completion of transitional services in a community-based 
program (i.e., in a Community Corrections Center or on home 
confinement).
    Section 550.58 has accordingly been amended to reflect this 
addition. Inmates who will not be able to complete the community-based 
portion of treatment will be those whose placement in such programs is 
precluded due to custodial considerations. Such considerations would 
include the presence of a detainer or the possibility that the inmate's 
placement in a community-based program would pose a danger to the 
public. The decision to place an inmate in a community-based program is 
made by the Warden based on his or her professional discretion.
    As of August 17, 1995, approximately 160 inmates who had already 
qualified for early release consideration under the provisions of the 
May 25, 1995 interim rule (meaning they had completed the residential 
program or had been placed in the residential program with an adjusted 
release date to follow) would not be able to complete the community-
based portion of the program due to the exclusion from community-based 
programs as a result of a detainer. The Bureau has determined that this 
group of inmates will not be adversely affected by this new interim 
rule. They will be considered under the rules in effect at the time 
they entered the residential program. However, any inmate in this group 
who loses his or her eligibility for early release (due to expulsion 
from the program or for other reasons as provided by the regulations) 
must reenter the program and will then be governed by the eligibility 
requirements of this new interim rule. Any inmate with a detainer, 
however, who has not entered the residential drug treatment program by 
August 17, 1995 will be subject to the restrictions of the new interim 
rule.
    This exception from application of this new interim rule for 
inmates with detainers who had already entered the residential 
treatment program will not be extended to any other group of inmates. 
Inmates who are excluded for any other reasons from a community-based 
program, such as posing a danger to the public, are no longer eligible 
for an early release. The adjusted projected release dates for these 
inmates will revert to their prior status. This action is similar to 
the manner in which projected good time may be recomputed before it is 
vested.
    Additional changes to the introductory text have been made for the 
sake of clarity. For example, the introductory text more clearly 
emphasizes that early release consideration for inmates is applicable 
to inmates sentenced to a term of imprisonment pursuant to the 
provisions of 18 U.S.C. Chapter 227,

[[Page 25122]]

Subchapter D. Inmates sentenced under ``old law'' provisions are not 
eligible, regardless of their eligibility for parole. The restriction 
for inmates who have a prior federal and/or state conviction for 
homicide, forcible rape, robbery, or aggravated assault has been 
reworded to remove the phrase ``federal and/or state''. This is being 
done in order to include foreign convictions.
    The Bureau's response to other comments to the May 25, 1995 interim 
rule will be contained in a future Federal Register document.
    Interested persons may participate in this new interim rulemaking 
by submitting data, views, or arguments in writing to the Bureau of 
Prisons, 320 First Street, NW., HOLC Room 754, Washington, DC 20534. 
Comments received on the interim rule provisions during the comment 
period will be considered before final action is taken. All comments 
received remain on file for public inspection at the above address.
    The Bureau of Prisons has determined that this rule is not a 
significant regulatory action for the purpose of E.O. 12866, and 
accordingly this rule was not reviewed by the Office of Management and 
Budget. After review of the law and regulations, the Director, Bureau 
of Prisons has certified that this rule, for the purpose of the 
Regulatory Flexibility Act (Pub. L. 96-354), does not have a 
significant impact on a substantial number of small entities.

List of Subjects in 28 CFR Part 550

    Prisoners.
Kathleen M. Hawk,
Director, Bureau of Prisons.

    Accordingly, pursuant to the rulemaking authority vested in the 
Attorney General in 5 U.S.C. 552(a) and delegated to the Director, 
Bureau of Prisons in 28 CFR 0.96(p), part 550 in subchapter C of 28 
CFR, chapter V is amended as set forth below.

SUBCHAPTER C--INSTITUTIONAL MANAGEMENT

PART 550--DRUG PROGRAMS

    1. The authority citation for 28 CFR part 550 continues to read as 
follows:

    Authority: 5 U.S.C. 301; 18 U.S.C. 3621, 3622, 3624, 4001, 4042, 
4081, 4082 (Repealed in part as to offenses committed on or after 
November 1, 1987), 4251-4255, 5006-5024 (repealed October 12, 1984 
as to conduct occurring after that date), 5039; 28 U.S.C. 509, 510; 
28 CFR 0.95-0.99.

    2. In Sec. 550.58, the introductory text and paragraphs (a)(1)(iii) 
and (a)(2)(i) are revised to read as follows:

Sec. 550.58  Consideration for early release.

    Except as provided in this paragraph, an inmate who was sentenced 
to a term of imprisonment pursuant to the provisions of 18 U.S.C. 
Chapter 227, Subchapter D, and who completes a residential drug abuse 
treatment program including subsequent transitional services in a 
community-based program (i.e., in a Community Corrections Center or on 
home confinement) during his or her current commitment may be eligible, 
in accordance with paragraph (a) of this section, for early release by 
a period not to exceed 12 months. The following categories of inmates 
are not eligible: INS detainees, pretrial inmates, contractual boarders 
(for example, D.C., State, or military inmates), inmates whose current 
offense is determined to be a crime of violence as defined in 18 U.S.C. 
924(c)(3), inmates who have a prior conviction for homicide, forcible 
rape, robbery, or aggravated assault, and inmates who are not eligible 
for participation in a community-based program as determined by the 
Warden on the basis of his or her professional discretion.
    (a) Eligibility. (1) * * *
* * * * *
    (iii) The inmate completes a refresher treatment program and all 
applicable transitional services programs in a community-based program 
(i.e., in a Community Corrections Center or on home confinement); and
* * * * *
    (2) * * *
    (i) The inmate completes all applicable transitional services 
programs in a community-based program (i.e., in a Community Corrections 
Center or on home confinement); and
* * * * *
[FR Doc. 96-12472 Filed 5-16-96; 8:45 am]
BILLING CODE 4410-05-P

Complete official Federal Register PDF

FR Doc. 96-12454 Hazardous Materials in Intrastate Transportation; Extension of Comment Period
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24904-24905]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12454]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Parts 171, 173 and 180

[Docket No. HM-200; Notice No. 96-9]
RIN 2137-AB37

Hazardous Materials in Intrastate Transportation; Extension of 
Comment Period

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Supplemental notice of proposed rulemaking (SNPRM); extension 
of comment period.

-----------------------------------------------------------------------

SUMMARY: RSPA is extending for 60 days, until August 16, 1996, the 
period for submitting comments on its March 20, 1996 supplemental 
notice of proposed rulemaking (SNPRM) in this proceeding. In the SNPRM, 
RSPA proposed certain exceptions from requirements in the Hazardous 
Materials Regulations that would otherwise apply to: the transportation 
of small quantities of certain hazardous materials used by carriers, 
particularly private carriers, in the conduct of their businesses 
(``materials of trade''); smaller cargo tank motor vehicles (less than 
13,250 liters [3,500 gallons] capacity) used exclusively in intrastate 
transportation of flammable liquid petroleum products; and registered 
inspections of these smaller cargo tank motor vehicles used exclusively 
for transporting flammable liquid petroleum fuels.

DATES: Written comments: Comments must be received on or before August 
16, 1996.

ADDRESSES: Comments: Address comments to Dockets Unit, Research and 
Special Programs Administration, U.S. Department of Transportation, 
Washington, DC 20590-0001. Comments should identify the Docket (HM-200) 
and be submitted, if possible, in five copies. Persons wishing to 
receive confirmation of receipt of their comments should include a 
self-addressed stamped postcard showing the docket number. The Dockets 
Unit is located in Room 8421 of the Nassif Building, 400 Seventh 
Street, SW., Washington, DC 20590-0001. Telephone: 202-366-5046. Public 
dockets may be reviewed between the hours of 8:30 a.m. and 5:30 p.m.; 
Monday through Friday except Federal holidays.

FOR FURTHER INFORMATION CONTACT:
Jackie Smith or Diane LaValle, 202-366-8553, Office of Hazardous 
Materials Standards, RSPA, 400 Seventh Street, SW., Washington, DC 
20590-0001.

SUPPLEMENTARY INFORMATION: In July 1993, RSPA proposed to extend the 
application of the Hazardous Materials Regulations (HMR), 49 CFR Parts 
171-180, to all intrastate carriers of hazardous materials in commerce 
and their shippers. The notice of proposed rulemaking (NPRM), was 
published on July 9, 1993 (58 FR 36920), and a correction was published 
on July 15, 1993 (58 FR 38111). Based on comments to that NPRM, on 
March 20, 1996, RSPA published a supplemental notice proposing three 
additional changes to the HMR. See 61 FR 11481. These changes would 
provide: (1) An exception for ``materials of trade,'' certain small 
quantities of hazardous materials transported and used by carriers, 
particularly private carriers, in the conduct of their businesses; (2) 
an exception to permit the continued use of non-specification smaller 
cargo tank motor vehicles (i.e., less than 13,250 liters [3,500 
gallons] capacity) used exclusively in intrastate transportation of 
flammable liquid petroleum products; and (3) an exception from certain

[[Page 24905]]

requirements that address registered inspection of these smaller cargo 
tank motor vehicles that are used exclusively for transporting 
flammable liquid petroleum fuels. These proposals are aimed are 
reducing regulatory burdens on persons subject to the HMR where costs 
may be disproportionate to safety benefits.
    A number of interested parties have requested additional time for 
them to more fully consider these proposals. Farmers, farm suppliers, 
and agricultural transporters state that they are presently occupied 
with activities relating to planting this year's crop, and that they 
need an extension of the comment period so that they may participate in 
this important rulemaking. Because these parties' input to this 
rulemaking would be valuable, RSPA is extending the comment period for 
60 days, until August 16, 1996.

    Issued in Washington, DC, on May 14, 1996, under authority 
delegated in 49 CFR part 106, Appendix A.
Alan I. Roberts,
Associate Administrator for Hazardous Materials Safety.
[FR Doc. 96-12454 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-60-M

Complete official Federal Register PDF

FR Doc. 96-12448 Groundfish of the Bering Sea and Aleutian Islands Area; Reserve Apportionment
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24905-24906]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12448]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 675

[Docket No. 960129019-6091-01; I.D. 050396A]

Groundfish of the Bering Sea and Aleutian Islands Area; Reserve 
Apportionment

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

[[Page 24906]]

ACTION: Apportionment of reserve.

-----------------------------------------------------------------------

SUMMARY: NMFS is apportioning reserve to certain target species in the 
Bering Sea and Aleutian Islands management area (BSAI). This action is 
necessary to allow for ongoing harvest and account for previous harvest 
of the total allowable catch (TAC). It is intended to promote the goals 
and objectives of the North Pacific Fishery Management Council.

EFFECTIVE DATE: 12 noon, Alaska local time (A.l.t.), May 16, 1996,until 
12 midnight, A.l.t., December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Andrew N. Smoker, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the U.S. BSAI 
exclusive economic zone is managed by NMFS according to the Fishery 
Management Plan for the Groundfish Fishery of the Bering Sea and 
Aleutian Islands Area (FMP) prepared by the North Pacific Fishery 
Management Council under authority of the Magnuson Fishery Conservation 
and Management Act. Fishing by U.S. vessels is governed by regulations 
implementing the FMP at 50 CFR parts 620 and 675.
    The Director, Alaska Region, NMFS, has determined that the initial 
TACs specified for pollock in the Bering Sea subarea; for pollock in 
the Aleutian Islands subarea; for Atka mackerel in the combined Eastern 
Aleutian District and Bering Sea subarea; for Pacific ocean perch in 
the Eastern Aleutian District; for Atka mackerel and Pacific ocean 
perch in the Central and Western Aleutian Districts; and for Pacific 
cod, arrowtooth flounder, and the ``other species'' category in the 
BSAI; need to be supplemented from the non-specific reserve in order to 
continue operations and account for prior harvest.
    Therefore, in accordance with Sec. 675.20(b), NMFS is apportioning 
from the reserve to TACs for the following species: (1) for the Bering 
Sea subarea - 89,250 metric tons (mt) to pollock, (2) for the Aleutian 
Islands subarea - 2,670 mt to pollock, (3) for the combined Eastern 
Aleutian District and Bering Sea subarea - 4,005 mt to Atka mackerel; 
(4) for the Eastern Aleutian District- 454 mt to Pacific ocean perch; 
(6) for the Central Aleutian District - 5,040 mt to Atka mackerel, 454 
mt to Pacific ocean perch; (7) for the Western Aleutian District - 
6,879 mt to Atka mackerel; 907 mt to Pacific ocean perch and (6) for 
the BSAI - 40,500 mt to Pacific cod, 1,350 mt to arrowtooth flounder, 
and 3,019 mt to the ``other species'' category.
    These apportionments are consistent with Sec. 675.20(a)(2)(i) and 
do not result in overfishing of a target species or the ``other 
species'' category because the revised TACs are equal to or less than 
specifications of acceptable biological catch.
    Pursuant to Sec. 675.20(a)(3)(i), the apportionments of pollock are 
allocated between the inshore and offshore components:
    (1) for the Bering Sea subarea - 31,238 mt to vessels catching 
pollock for processing by the inshore component and 58,012 mt to 
vessels catching pollock for processing by the offshore component; (2) 
for the Aleutian Islands subarea - 935 mt to vessels catching pollock 
for processing by the inshore component and 1,735 mt to vessels 
catching pollock for processing by the offshore component.
    Pursuant to Sec. 675.20(a)(3)(iv), the apportionment of the BSAI 
Pacific cod TAC is allocated 810 mt to vessels using jig gear, 17,820 
mt to vessels using hook-and-line or pot gear, and 21,870 mt to vessels 
using trawl gear.
    In accordance with the 1996 final specifications for the Bering Sea 
and Aleutian Islands (61 FR 4311, February 5, 1996), the allocation to 
hook-and-line/pot gear will result in seasonal apportionments as 
follows: for the period January 1 through
    April 30 - 94,118 mt, for the period May 1 through August 31 - 
21,176 mt, and for the period September 1 through December 31 - 3,506 
mt.
    This apportionment was proposed in the Federal Register (61 FR 
16085, April 11, 1996) requesting public comment. The public comment 
period ended on April 25, 1996, and no comments were received.

Classification

    This action is taken under 50 CFR 675.20 and is in compliance with 
E.O. 12866.

List of Subjects in 50 CFR Part 675

    Fish, Fisheries, Reporting and recordkeeping requirements.

    Authority: 16 U.S.C. 1801, et seq.

    Dated: May 10, 1996.
Richard H. Schaefer,
Director, Office of Fisheries Conservation and Management, National 
Marine Fisheries Service.
[FR Doc. 96-12448 Filed 5-16-96; 8:45 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-12446 Groundfish of the Bering Sea and Aleutian Islands Area; Other Nontrawl Fisheries in the Bering Sea and Aleutian Islands Management Area
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Page 24905]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12446]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 675

[Docket No. 960129019-6091-01, I.D. 051396E]

Groundfish of the Bering Sea and Aleutian Islands Area; Other 
Nontrawl Fisheries in the Bering Sea and Aleutian Islands Management 
Area

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is closing the directed fishery for groundfish in the 
other nontrawl fishery in the Bering Sea and Aleutian Islands 
management area (BSAI). This action is necessary to prevent exceeding 
the 1996 bycatch allowance of Pacific halibut apportioned to the other 
nontrawl fishery category in the BSAI.

EFFECTIVE DATE: 12 noon, Alaska local time (A.l.t.), May 15, 1996, 
until 12 midnight, A.l.t., December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Andrew Smoker, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for the Groundfish Fishery of the Bering Sea and Aleutian Islands 
Area (FMP) prepared by the North Pacific Fishery Management Council 
under authority of the Magnuson Fishery Conservation and Management 
Act. Fishing by U.S. vessels is governed by regulations implementing 
the FMP at 50 CFR parts 620 and 675.
    The 1996 bycatch allowance of Pacific halibut apportioned to the 
other nontrawl fishery category, which is defined at 
Sec. 675.21(b)(2)(ii)(E), was established by the Final 1996 Harvest 
Specifications of Groundfish (61 FR 4311, February 5, 1996) as 100 
metric tons.
    The Director, Alaska Region, NMFS, has determined, in accordance 
with Sec. 675.21(d), that the 1996 bycatch allowance of Pacific halibut 
apportioned to the other nontrawl fishery category in the BSAI has been 
reached. Therefore, NMFS is closing the directed fishery for groundfish 
in the other nontrawl fishery category in the BSAI.
    Maximum retainable bycatch amounts for applicable gear types may be 
found in the regulations at Sec. 675.20(h).

Classification

    This action is taken under Sec. 675.21 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801, et seq.

    Dated: May 13, 1996.
Donald J. Leedy,
Acting Director, Office of Fisheries Conservation and Management, 
National Marine Fisheries Service.
[FR Doc. 96-12446 Filed 5-14-96; 3:07 pm]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-12445 Groundfish of the Bering Sea and Aleutian Islands Area; Pacific Cod by Vessels Using Hook-and-Line Gear in the Bering Sea and Aleutian Islands
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Page 24905]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12445]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 675

[Docket No. 960129019-6019-01; I.D. 051396D]

Groundfish of the Bering Sea and Aleutian Islands Area; Pacific 
Cod by Vessels Using Hook-and-Line Gear in the Bering Sea and Aleutian 
Islands

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is prohibiting directed fishing for Pacific cod by 
vessels using hook-and-line gear in the Bering Sea and Aleutian Islands 
management area (BSAI). This action is necessary because the second 
seasonal Pacific halibut bycatch mortality allowance apportioned to the 
Pacific cod hook-and-line fishery in the BSAI has been reached.

EFFECTIVE DATE: 12 noon, Alaska local time (A.l.t.), May 15, 1996, 
until 12 midnight, A.l.t., December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Mary Furuness, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for the Groundfish Fishery of the Bering Sea and Aleutian Islands 
Area (FMP) prepared by the North Pacific Fishery Management Council 
under authority of the Magnuson Fishery Conservation and Management 
Act. Fishing by U.S. vessels is governed by regulations implementing 
the FMP at 50 CFR parts 620 and 675.
    The second seasonal Pacific halibut bycatch mortality allowance for 
the hook-and-line Pacific cod fishery, which is defined at 
Sec. 675.21(b)(2)(ii)(A), is 40 metric tons (61 FR 4311, February 5, 
1996).
    The Director, Alaska Region, NMFS, has determined, in accordance 
with Sec. 675.21(d), that the second seasonal Pacific halibut bycatch 
mortality allowance for the Pacific cod hook-and-line fishery in the 
BSAI has been reached. Therefore, NMFS is prohibiting directed fishing 
for Pacific cod by vessels using hook-and-line gear in the BSAI.
    Maximum retainable bycatch amounts for applicable gear types may be 
found in the regulations at Sec. 675.20(h).

Classification

    This action is taken under Sec. 675.20 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: May 13, 1996.
Donald J. Leedy,
Acting Director, Office of Fisheries Conservation and Management, 
National Marine Fisheries Service.
[FR Doc. 96-12445 Filed 5-14-96; 3:07 pm]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-12434 Onions Grown in South Texas; Change in Regulatory Period
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24877-24878]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12434]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 97 / Friday, May 17, 1996 / Rules and 
Regulations

[[Page 24877]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 959

[Docket No. FV95-959-3FR]

Onions Grown in South Texas; Change in Regulatory Period

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule changes the end of the regulatory period for 
onions grown in South Texas under Marketing Order 959 from June 15 to 
June 4 of each year. Terminating the handling regulation on June 4 will 
relieve restrictions on handlers who ship late season onions and help 
them become more competitive with handlers from non-marketing order 
areas without diminishing South Texas marketing order objectives. A 
corresponding change in the dates for the import regulation also will 
be made in a second document. This final rule also includes a 
conforming change recognizing that the onions previously defined as 
``Extra large'' are now defined as ``Colossal'' under the U.S. grade 
standards for onions.

EFFECTIVE DATE: June 4, 1996.

FOR FURTHER INFORMATION CONTACT: Belinda G. Garza, Marketing Order 
Administration Branch, F&V, AMS, USDA, 1313 E. Hackberry, McAllen, TX 
78501; telephone: 210-682-2833; FAX 210-682-5942; or Robert F. 
Matthews, Marketing Specialist, Marketing Order Administration Branch, 
F&V, AMS, USDA, room 2523-S, P.O. Box 96456, Washington, DC 20090-6456; 
telephone: 202-690-0464; FAX 202-720-5698.

SUPPLEMENTARY INFORMATION: This final rule is issued under Marketing 
Agreement No. 143 and Marketing Order No. 959 (7 CFR part 959), as 
amended, regulating the handling of onions grown in South Texas, 
hereinafter referred to as the ``order.'' This order is effective under 
the Agricultural Marketing Agreement Act of 1937, as amended (7 U.S.C 
601-674), hereinafter referred to as the ``Act.''
    The Department of Agriculture (Department) is issuing this rule in 
conformance with Executive Order 12866.
    This final rule has been reviewed under Executive Order 12778, 
Civil Justice Reform. This rule is not intended to have retroactive 
effect. This final rule will not preempt any State or local laws, 
regulations, or policies, unless they present an irreconcilable 
conflict with this rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and request a modification of the order or to be exempted 
therefrom. A handler is afforded the opportunity for a hearing on the 
petition. After the hearing the Secretary will rule on the petition. 
The Act provides that the district court of the United States in any 
district in which the handler is an inhabitant, or has his or her 
principal place of business, has jurisdiction to review the Secretary's 
ruling on the petition, provided an action is filed not later than 20 
days after the date of the entry of the ruling.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this action on small entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and rules issued thereunder, are unique in that 
they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are 35 handlers of South Texas onions who are subject to 
regulation under the marketing order and 89 producers in the regulated 
area. Small agricultural service firms, which includes handlers, have 
been defined by the Small Business Administration (13 CFR 121.601) as 
those having annual receipts of less than $5,000,000, and small 
agricultural producers are defined as those having annual receipts of 
less than $500,000. The majority of handlers and producers of South 
Texas onions may be classified as small entities.
    At a public meeting on November 8, 1994, the South Texas Onion 
Committee (committee) unanimously recommended, under the authority of 
Sec. 959.52(c) of the order, changing the termination date of the 
regulatory period for all varieties of regulated onions from June 15 to 
June 4. Currently, order regulations are in effect from March 1 through 
June 15 each year. The early and mid-season crop is produced in the 
Lower Rio Grande Valley (District 1), which generally accounts for 
about 80 percent of the total. The remaining crop, generally 20 
percent, is produced in the Laredo-Winter Garden area of South Texas 
(District 2). These are the last regulated shipments to leave the 
production area each season.
    In April 1994, based on a committee recommendation, the regulatory 
period was extended from May 20 to June 15 (59 FR 17265; April 12, 
1994). At that time, the committee believed that the application of 
quality control requirements over a longer time was necessary to 
enhance the South Texas onion industry's market research and promotion 
efforts, and protect its quality image. The committee also believed 
that District 2 handlers should pay assessments on more of their 
shipments for the research and promotion programs that benefit the 
entire industry.
    After one season's experience, District 2 growers and handlers 
requested the committee to reconsider the regulatory extension. 
Shipments made from District 2 compete with onions produced in West 
Texas and other areas of the United States not regulated under Federal 
marketing orders. Onion prices are usually quite low during this period 
and unregulated areas have a competitive advantage over District 2 
because inspection costs for quality control purposes and 
administrative assessments are not incurred by shippers from these 
areas. Ending regulations on June 4, rather than June

[[Page 24878]]

15, will relieve restrictions on District 2 shippers and help them 
become more competitive with shippers from these production areas 
without diminishing program objectives.
    Section 8e provides that whenever certain specified commodities, 
including onions, are regulated under a Federal marketing order, 
imports of that commodity must meet the same or comparable grade, size, 
quality, and maturity requirements as those in effect for the 
domestically produced commodity, subject to concurrence by the United 
States Trade Representative. The Act further provides that when two or 
more marketing orders covering the same commodity are concurrently in 
effect, imports will be subject to the requirements established for the 
commodity grown in the area with which the imported commodity is in 
most direct competition. Because this rule changes the regulatory 
period under the South Texas onion marketing order, corresponding 
changes will be needed in the onion import regulations. Such changes 
are addressed in a separate onion import rule.
    The proposed rule concerning this action was published in the 
February 20, 1996, Federal Register (61 FR 6328), with a 30-day comment 
period ending March 21, 1996. One comment was received in opposition to 
the proposed rule from a packer. The commenter stated that both South 
Texas and Idaho-Eastern Oregon successfully compete with onion 
producing areas that are not regulated. He further stated that he 
believed that the order was necessary to improve quality and thus make 
the production area a stronger competitor in the onion industry. The 
committee contends that this competition tends to bring about low 
prices to the late producing areas, and sometimes the addition of an 
administrative assessment and inspection fee may leave the shipper of 
late season South Texas onions at a competitive disadvantage. Thus, the 
committee believes that removing inspection and assessment requirements 
for a very short period will help shippers of late onions meet the 
competition from production areas outside of South Texas without 
diminishing program objectives.
    After thoroughly analyzing the comment received and other available 
information, the Department has concluded that ending the regulatory 
period on June 4, rather than June 15, as recommended by the committee 
will reduce the regulatory burden on late season shippers and help them 
compete more effectively with shippers from unregulated areas in the 
United States without adversely affecting the overall objectives of the 
marketing order. As mentioned earlier, onion prices are usually quite 
low late in the season and unregulated areas have a competitive 
advantage over the late season shippers from South Texas because 
inspection costs for quality control purposes and administrative 
assessments are not incurred by shippers from many of these areas.
    This final rule also changes the name of the largest size 
classification of onions under the handling regulation (7 CFR 
959.322(b)(5)) from ``Extra large'' to ``Colossal'' to bring that 
designation into conformity with the designation used in the U.S. 
Standards for Grades of Bermuda-Granex-Grano Type Onions (7 CFR 
51.3195-51.3209), and the U.S. Standards for Grades of Onions (Other 
Than Bermuda-Granex-Grano and Creole Types) (7 CFR 51.2830-51.2854). 
The standards were revised effective October 10, 1995 (60 FR 46976). 
One of the revisions was the addition of a new size classification 
called ``Colossal'' for onions 3\3/4\ inches or larger in diameter. A 
conforming change failed to be made in the handling regulations and 
onions of this size continued to be referred to as ``Extra large'' in 
paragraph (b)(5) of section 959.322. Hence, this term should be changed 
to ``Colossal'' to bring the handling regulation into conformity with 
the standards. The committee recommended this minor conforming change.
    In accordance with section 8e of the Act, the United States Trade 
Representative has concurred with the issuance of this final rule.
    Based on the above, the AMS has determined that this action will 
not have a significant economic impact on a substantial number of small 
entities.
    After consideration of all relevant matter presented, including the 
information and recommendations submitted by the commenter, committee 
and other available information, it is hereby found that this rule, as 
hereinafter set forth, will tend to effectuate the declared policy of 
the Act.
    Pursuant to 5 U.S.C 553, it is further found that good cause exists 
for not postponing the effective date of this action until 30 days 
after publication in the Federal Register because: (1) This regulation 
relaxes restrictions on South Texas onion handlers by ending 
regulations on June 4 of each season rather than June 15 of each 
season; (2) the shipping season for South Texas onions has already 
begun and the committee would like this action effective for this 
season; (3) changing the ending date of the handling regulation was 
discussed at a public meeting, and all interested persons had an 
opportunity to provide input; and (4) there are no additional 
regulatory burdens imposed by this rule which require special 
preparations of handlers.

List of Subjects in 7 CFR Part 959

    Marketing agreements, Onions, Reporting and recordkeeping 
requirements.

    For the reasons set forth in the preamble, 7 CFR part 959 is hereby 
amended as follows:

PART 959--ONIONS GROWN IN SOUTH TEXAS

    1. The authority citation for 7 CFR part 959 continues to read as 
follows:

    Authority: 7 U.S.C. 601-674.

    2. In Sec. 959.322, the introductory text and paragraph (b)(5) are 
revised to read as follows:

Sec. 959.322  Handling regulation.

    During the period beginning March 1 and ending June 4, no handler 
shall handle any onions unless they comply with paragraphs (a) through 
(d), or (e), or (f) of this section. In addition, no handler may 
package or load onions on Sunday during the period March 1 through May 
20.
* * * * *
    (b) * * *
    (5) ``Colossal''--3\3/4\ inches or larger in diameter.
* * * * *
    Dated: May 14, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-12434 Filed 5-16-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-12427 Safety Zone; Long Beach Harbor, CA
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24892-24893]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12427]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 165

[COTP Los Angeles-Long Beach, CA 96-008]
RIN 2115-AA97

Safety Zone; Long Beach Harbor, CA

AGENCY: Coast Guard, DOT.

ACTION: Final rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a temporary safety zone in the 
navigable waters of the United States in the vicinity of the South East 
side of Pier ``J'' in the Long Beach Outer Harbor, California. The 
event requiring the establishment of this safety zone is the Pier ``J'' 
breakwater construction project. Duration of this project is estimated 
to be 11 months. A safety zone is necessary to safeguard recreational 
and commercial craft from the dangers of the construction project and 
to prevent interference with the vessels engaged in these operations. 
The safety zone includes all waters within the boundaries defined by 
the line connecting the following coordinates:

Latitude                             Longitude                          
                                                                        
33 deg. 44.5'N.                      118 deg. 11.2'W.                   
33 deg. 44.5'N.                      118 deg. 10.9'W.                   
33 deg. 44.3'N.                      118 deg. 10.8'W.                   
33 deg. 44.0'N.                      118 deg. 10.8'W.                   
33 deg. 44.0'N.                      118 deg. 11.1'W.                   
                                                                        

    Entry into, transit through, or anchoring within the safety zone by 
vessels or persons other than those engaged in the construction 
project, or vessels servicing the Maersk terminal is prohibited unless 
authorized by the Captain of the Port.

DATES:  Effective Date: This rule is effective at 12:01 a.m. PDT on 
April, 24, 1996 and will remain in effect until 12:01 a.m. PST on March 
31, 1997, unless cancelled earlier by the Captain of the Port Los 
Angeles-Long Beach, Ca.
    Comments: Comments on this regulation must be received by June 17, 
1996.

ADDRESSES: Comments should be mailed to Commanding Officer, Coast Guard 
Marine Safety Office, 165 N. Pico Avenue, Long Beach, Ca 90802. 
Comments received will be available for inspection and copying within 
the Port Safety Division at MSO Los Angeles-Long Beach. Normal office 
hours are between 8 a.m. and 4 p.m., Monday through Friday, except 
federal holidays.

FOR FURTHER INFORMATION CONTACT: Chief Petty Officer Daniel J. Walsh, 
Port Safety and Security Division, Marine Safety Office Los Angeles-
Long Beach, (310) 980-4454.

SUPPLEMENTARY INFORMATION: In accordance with 5 U.S.C. 553, a notice of 
proposed rulemaking was not published for this regulation and good 
cause exists for making it effective in less than 30 days after Federal 
Register publication. Following normal rulemaking procedures could not 
be done in a timely fashion in that the Coast Guard was not approached 
concerning the necessity for implementation of a safety zone until late 
in the planning process. The actual stipulations of the safety zone 
were not finalized until a date fewer than 30 days prior to the start 
of the project.
    Although this regulation is published as a final rule without prior 
notice, an opportunity for public comment is nevertheless desirable to 
ensure the regulation is both reasonable and workable. Accordingly, 
persons wishing to comment may do so by submitting written comments to 
the office listed under Addresses in this preamble. Those providing 
comments should identify the docket number (COTP Los Angeles-Long 
Beach, CA; 96-008) for the regulation and also include their name, 
address, and reason(s) for each comment presented. Persons wanting 
acknowledge of receipt of comments should enclose a stamped, self-
addressed postcard or envelope.
    Based upon the comments received, the scope of the regulation may 
be changed.

Discussion of Regulation

    The project to construct a breakwater around the Pier ``J'' Maersk 
terminal entrance has already been initiated. A safety zone is 
necessary to safeguard recreational and commercial craft from the 
dangers of the construction project and to prevent interference with 
vessels engaged in these operations. This safety zone will be enforced 
by U.S. Coast Guard personnel. The Coast Guard Auxiliary and the Long 
Beach Lifeguards will assist in the enforcement of the safety zone. 
Persons and vessels are prohibited from entering into, transiting 
through, or anchoring within the safety zone unless authorized by the 
Captain of the Port of his designated representative.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
regulation to be so minimal that a full Regulatory Evaluation under 
paragraph 10(e) of the regulatory policies and procedures of the 
Department of Transportation is unnecessary. The safety zone does not 
extend into the vessel traffic lanes. It will have little or no impact 
on commercial vessels transiting through the harbor.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this regulation will have a 
significant economic impact on a substantial number of small entities. 
``Small entities'' include independently owned and operated small 
businesses that are not dominant in their field and that otherwise 
qualify as ``small business concerns'' under Section 3 of the Small 
Business Act (15 U.S.C. 632). As discussed in the ``Regulatory 
Evaluation'' section, because it expects the impact of this regulation 
to be minimal, the Coast Guard certifies under 5 U.S.C. 605(b) that 
this regulation will not have a significant economic impact on a 
substantial number of small entities.

Collection of Information

    This regulation contains no collection of information requirements 
under the

[[Page 24893]]

Paperwork Reduction Act (44 U.S.C. 3501 et. seq.).

Federalism

    The Coast Guard has analyzed this regulation under the principles 
and criteria contained in Executive Order 12612, and has determined 
that this rule does not have sufficient federalism implications to 
warrant the preparation of a Federalism Assessment.

Environmental Assessment

    The Coast Guard has considered the environmental impact of this 
regulation and concluded that under section 2.B.2. of Commandant 
Instruction M16475.1B it will have no significant environmental impact 
and it is categorically excluded from further environmental 
documentation.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security Measures, Waterways.

Regulation

    In consideration of the foregoing, Subpart F of Part 165 of Title 
33, Code of Federal Regulations, is amended as follows:

PART 165--[AMENDED]

    1. The authority citation for 33 CFR part 165 continues to read as 
follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1(g), 
6.04-1, 6.04-6 and 160.5; 49 CFR 1.46.

    2. A new section 165.T11-058 is added to read as follows:

Sec. 165.T1158  Safety zone: Long Beach Harbor, CA

    (a) Location. All waters within the boundaries defined by the line 
connecting the following coordinates are established as a safety zone 
(Datum: NAD 83):

Latitude                             Longitude                          
                                                                        
33 deg. 44.5' N                      118 deg. 11.2' W.                  
33 deg. 44.5' N                      118 deg. 10.9' W.                  
33 deg. 44.3' N                      118 deg. 10.8' W.                  
33 deg. 44.0' N                      118 deg. 10.8' W.                  
33 deg. 44.0' N                      118 deg. 11.1' W.                  
                                                                        
                                                                        

    (b) Effective Date. This section is effective at 12:01 a.m. PDT on 
April 24, 1996. It will remain in effect until 12:01 a.m. PDT on March 
31, 1997 unless cancelled earlier by the Captain of the Port.
    (c) Regulations. The general regulations governing safety zones 
contained in 33 CFR 165.23 apply. No person or vessel may enter or 
remain within the designated zones without the permission of the 
Captain of the Port Los Angeles-Long Beach, California or his 
representative.

    Dated: April 24, 1996.
E.E. Page,
Captain, U.S. Coast Guard, Captain of the Port, Los Angeles-Long Beach, 
California.
[FR Doc. 96-12427 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-12425 Opportunities for Youth: Youthbuild Program
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 25124-25125]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12425]

[[Page 25123]]

_______________________________________________________________________

Part VII

Department of Housing and Urban Development

_______________________________________________________________________

24 CFR Part 585

Opportunities for Youth: Youthbuild Program; Interim Rule

Federal Register / Vol. 61, No. 97 / Friday, May 17, 1996 / Rules and 
Regulations

[[Page 25124]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Office of Assistant Secretary for Community Planning and Development

24 CFR Part 585

[Docket No. FR-4038-I-01]
RIN 2506-AB79

Opportunities for Youth: Youthbuild Program

AGENCY: Office of the Assistant Secretary for Community Planning and 
Development, HUD.

ACTION: Interim rule.

-----------------------------------------------------------------------

SUMMARY: The Youthbuild program is one of many HUD programs that 
directly invests in distressed communities, and opportunities to 
further the goals of the program and stimulate community investment and 
support for the Youthbuild program must be encouraged. This interim 
rule amends the regulations for the Youthbuild Program to define 
administrative costs for which Youthbuild funds may be expended.

DATES: Effective Date: June 17, 1996.
    Comments Due Date: July 1, 1996.

ADDRESSES: Interested persons are invited to submit comments regarding 
this interim rule to Rules Docket Clerk, Office of General Counsel, 
Room 10276, Department of Housing and Urban Development, 451 Seventh 
Street SW., Washington, D.C. 20410-0500.
    Communications should refer to the above docket number and title. 
Facsimile (FAX) comments are not acceptable. A copy of each 
communications submitted will be available for public inspection and 
copying between 7:30 a.m. and 5:30 p.m. weekdays at the above address.

FOR FURTHER INFORMATION CONTACT: The Office of Economic Development, 
Department of Housing and Urban Development, Room 7136, 451 Seventh 
Street SW., Washington, DC 20410. Telephone (202) 708-2035; TYY (202) 
708-1455. (These telephone numbers are not toll-free.)

SUPPLEMENTARY INFORMATION:

Background

    Section 164 of the Housing and Community Development Act of 1992 
(Pub.L. 102-550) amended title IV of the National Affordable Housing 
Act (42 U.S.C. 1437aaa) to add a new subtitle D which established the 
Youthbuild program. On February 21, 1995, the Department published a 
final rule at 60 FR 9734, which is codified at 24 CFR Part 585. This 
interim rule is intended to further address the use of Youthbuild funds 
for administrative costs, including overhead and salaries and wages 
associated with an implementation grant.
    The Department believes that the Youthbuild program is a valuable 
tool to promote job skills, neighborhood revitalization and economic 
self sufficiency and recognizes the need to staff these programs with 
competent personnel to provide education and training, and other 
support services to an ever growing population of disadvantaged youths. 
The Department and Youthbuild grantees now have valuable program 
experience in cost efficient ways of meeting the program's mission, 
delivering quality training and services, and serving more youth 
successfully. These times of shrinking Federal resources make it even 
more imperative that Youthbuild funds benefit the greatest number of 
youths. Examples of ways Youthbuild grantees have limited overhead 
expense include eliminating some administrative positions and assigning 
tasks to other personnel, physically locating the program in an 
existing facility, utilizing the expertise and experience of other 
programs and organizations, paying administrative costs with other 
funds, using existing equipment from other programs, and securing non-
federal matching funds to cover administrative costs. These examples 
demonstrate that partnerships with other public and private 
organizations in the community can be one of the keys to an effective 
program.
    The Youthbuild program is one of many HUD programs that directly 
invests in distressed communities, and opportunities to further the 
goals of the program and stimulate community investment and support for 
the Youthbuild program must be encouraged. Numerous Youthbuild grantees 
have been particularly innovative in establishing partnerships with 
local organizations such as educational institutions, training 
organizations, apprenticeship programs, social agencies, foundations 
and local governments, and adopting innovative and creative ways of 
delivering program services.
    This interim rule will affect only future grant awards.

Justification for Interim Rulemaking

    HUD generally publishes a rule for public comment before issuing a 
rule for effect, in accordance with HUD's own regulations on rulemaking 
in 24 CFR part 10. However, part 10 provides for exceptions to the 
general rule if the agency finds good cause to omit advance notice and 
public participation. The good cause requirement is satisfied when 
prior public procedure is ``impracticable, unnecessary, or contrary to 
the public interest'' (24 CFR 10.1). HUD finds that good cause exists 
to publish this rule for effect without first soliciting public 
comment, in that prior public comment is contrary to the public 
interest. This rule ensures direct program benefits for the maximum 
number of disadvantaged youths. Further, by letter dated December 6, 
1995, the Department asked all Youthbuild implementation grantees to 
describe innovative ways to limit overhead expenses as well as 
suggestions for measuring success. This rule takes into consideration 
those suggestions. Therefore, the Department believes that a 45-day 
public comment period is more than adequate in light of the compelling 
need to finalize the Department's policy for limiting overhead 
expenses.

Other Matters

    (a) Environmental Impact. A Finding of No Significant Impact with 
respect to the environment for this interim rule has been made in 
accordance with HUD regulations at 24 CFR part 50, which implement 
section 102(2)(C) of the National Environmental Policy Act of 1969. The 
Finding of No Significant Impact is available for public inspection 
between 7:30 a.m. and 5:30 p.m. weekdays in the Office of the Rules 
Docket Clerk, Office of the General Counsel, Department of Housing and 
Urban Development, Room 10276, 451 Seventh Street SW., Washington, D.C. 
20410.
    (b) Regulatory Flexibility Act. The Secretary, in accordance with 
the Regulatory Flexibility Act (5 U.S.C. 605(b)), has reviewed this 
interim rule before publication and by approving it certifies that this 
interim rule would not have a significant economic impact on a 
substantial number of small entities because the Youthbuild program 
affects primarily economically disadvantaged young adults by providing 
assistance for a wide range of multi-disciplinary activities to assist 
those young adults. The opportunities are designed to help 
disadvantaged young adults who have dropped out of high school to 
obtain the education and employment skills necessary to achieve 
economic self-sufficiency and develop leadership skills and a 
commitment to community development in low-income communities. It is 
anticipated that this interim rule will increase the number of young 
adults receiving assistance under federally-funded Youthbuild programs.

[[Page 25125]]

    (c) Executive Order 12612, Federalism. The General Counsel, as the 
Designated Official under section 6(a) of Executive Order 12612, 
Federalism, has determined that this interim rule does not have 
``federalism implications'' because it does not have substantial direct 
effects on the States (including their political subdivisions), or on 
the distribution of power and responsibilities among the various levels 
of government.
    (d) Executive Order 12606, The Family. The General Counsel, as the 
Designated Official under Executive Order 12606, The Family, has 
determined that some of the policies of this interim rule would have a 
potential significant impact on family formation, maintenance, and 
general well-being. The expected expansion of opportunities to 
economically disadvantaged young adults to enhance their education and 
employment skills will provide a positive impact on the family 
maintenance and general well-being. However since the impact on the 
family is beneficial and the interim rule involves very little HUD 
discretion, no further review is necessary.
    (e) Catalog of Federal Domestic Assistance. The Catalog of Federal 
Domestic Assistance Program number assigned to this program is 14.243.

List of Subjects in 24 CFR Part 585

    Grant programs--housing and community development, Homeless, Low- 
and very low-income families, Reporting and recordkeeping requirements.

    Accordingly, for the reasons set forth in the preamble, part 585 of 
title 24 of the Code of Federal Regulations is amended as follows:

PART 585--YOUTHBUILD PROGRAM

    1. The authority citation for part 585 continues to read as 
follows:

    Authority: 42 U.S.C. 3535(d) and 8011.

    2. In Sec. 585.305, paragraph (m) is amended to add new paragraphs 
(m)(1) and (m)(2), to read as follows:

Sec. 585.305  Eligible activities.

* * * * *
    (m) * * *
    (1) Administrative costs. The amount of Youthbuild funds used to 
pay the following costs, in whole or in part, must be charged as 
administrative costs:
    (i) Salaries, wages and related costs of the grantee's staff or 
other staff who are primarily engaged in general program administration 
and oversight. Youthbuild funded staff presumed to be primarily engaged 
in general program administration and oversight include the executive 
director, the program manager, the fiscal officer, the secretary and 
the administrative or program assistant. However, a grantee may provide 
evidence to rebut this presumption for an individual case.
    (ii) Other costs for goods and services required for the program, 
such as rental or purchase of vehicles, office supplies and equipment, 
utilities, insurance, legal, staff training, rental and maintenance of 
office space, mailing, advertising, technical assistance and fund 
raising.
    (2) Further restrictions on the use of Youthbuild funds. (i) 
Further restrictions may be imposed if the Department determines, based 
on information readily available that:
    (A) Costs are not sufficiently itemized;
    (B) The amount of program funds for trainee wages and benefits, 
including need-based stipends, benefits, incentives, tools and work 
clothes and/or the number of Youthbuild participants served are low in 
comparison to other comparable programs;
    (C) The participant training period is shorter than that in other 
comparable programs;
    (D) Alternative use of funds for eligible activities would be in 
the overall interest of the Youthbuild program.
    (ii) Restrictions include, but are not limited to, limitations on 
the use and availability of grant funds, reallocation of Youthbuild 
program budget, or cancellation of grant.

    Dated: April 24, 1996.
Andrew M. Cuomo,
Assistant Secretary for Community Planning and Development.
[FR Doc. 96-12425 Filed 5-16-96; 8:45 am]
BILLING CODE 4210-29-P

Complete official Federal Register PDF

FR Doc. 96-12390 Airworthiness Directives; The New Piper Aircraft, Inc. (Formerly Piper Aircraft Corporation) PA31, PA31P, and PA31T Series Airplanes
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24878-24881]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12390]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 90-CE-62-AD; Amendment 39-9621; AD 96-10-14]
RIN 2120-AA64

Airworthiness Directives; The New Piper Aircraft, Inc. (Formerly 
Piper Aircraft Corporation) PA31, PA31P, and PA31T Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment supersedes Airworthiness Directive (AD) 88-05-
05, which currently requires the following on certain The New Piper 
Aircraft, Inc. (Piper) PA31, PA31P, and PA31T series airplanes: 
repetitively inspecting both

[[Page 24879]]

the left and right main landing gear (MLG) forward sidebrace, and 
replacing any cracked MLG forward sidebrace. The Federal Aviation 
Administration's policy on aging commuter-class aircraft is to 
eliminate or, in certain instances, reduce the number of certain 
repetitive short-interval inspections when improved parts or 
modifications are available. This action retains the current repetitive 
inspection and necessary replacement requirements contained in AD 88-
05-05, and requires incorporating both a left and right MLG forward 
sidebrace of improved design as terminating action for the repetitive 
inspection requirement. The actions specified in this AD are intended 
to prevent the MLG from retracting because of a cracked MLG forward 
side brace, which, if not detected and corrected, could result in gear 
collapse and loss of control of the airplane during landing operations.

DATES: Effective June 27, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of June 27, 1996.

ADDRESSES: Service information that applies to this AD may be obtained 
from The New Piper Aircraft, Inc., Customer Services, 2926 Piper Drive, 
Vero Beach, Florida 32960. This information may also be examined at the 
Federal Aviation Administration (FAA), Central Region, Office of the 
Assistant Chief Counsel, Attention: Rules Docket 90-CE-62-AD, Room 
1558, 601 E. 12th Street, Kansas City, Missouri 64106; or at the Office 
of the Federal Register, 800 North Capitol Street NW., suite 700, 
Washington, DC.

FOR FURTHER INFORMATION CONTACT: Christina Marsh, Aerospace Engineer, 
FAA, Atlanta Aircraft Certification Office, Campus Building, 1701 
Columbia Avenue, suite 2-160, College Park, Georgia 30337-2748; 
telephone (404) 305-7362; facsimile (404) 305-7348.

SUPPLEMENTARY INFORMATION:

Events Leading to the AD

    A proposal to amend part 39 of the Federal Aviation Regulations (14 
CFR part 39) to include an AD that would apply to Piper PA31, PA31P, 
and PA31T series airplanes was published in the Federal Register on 
December 7, 1995 (60 FR 62776). The action proposed to supersede AD 88-
05-05 with a new AD that would (1) retain the requirement of 
repetitively inspecting both the left and right MLG forward sidebrace 
for cracks, and replacing any cracked MLG forward sidebrace; and (2) 
require replacing both the left and right MLG forward sidebrace with a 
part of improved design, part number (P/N) 85165-02 (left) and 85165-03 
(right) or P/N 85166-02 (left) and 85166-03 (right), as applicable, as 
terminating action for the repetitive inspection requirement. 
Accomplishment of the proposed inspections would be in accordance with 
Piper Service Bulletin No. 845A, dated October 9, 1987. The improved 
MLG forward sidebrace installations would be accomplished in accordance 
with the applicable maintenance manual.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. No comments were received on the 
proposed rule or the FAA's determination of the cost to the public.
    After careful review of all available information related to the 
subject presented above, the FAA has determined that air safety and the 
public interest require the adoption of the rule as proposed except for 
minor editorial corrections. The FAA has determined that these minor 
corrections will not change the meaning of the AD and will not add any 
additional burden upon the public than was already proposed.

Cost Impact

    The FAA estimates that 2,384 airplanes in the U.S. registry will be 
affected by this AD, that it will take approximately 8 workhours per 
airplane to accomplish the required replacement, and that the average 
labor rate is approximately $60 an hour. Parts cost approximately 
$1,000 per airplane (2 MLG forward sidebraces per airplane at 
approximately $500 per sidebrace). Based on these figures, the total 
cost impact of this AD on U.S. operators is estimated to be $3,528,320 
or $1,480 per airplane. This figure is based on the assumption that no 
affected airplane owner/operator has accomplished the required 
replacement.
    Piper has informed the FAA that parts have been distributed to 
owners/operators to equip 2,123 of the affected airplanes (4,246 MLG 
forward sidebraces of improved design). Assuming that each set of parts 
has been installed on an affected airplane, the cost impact of the 
required replacement upon U.S. owners/operators of the affected 
airplanes is reduced by $3,142,040 from $3,528,320 to $386,280.

The FAA's Aging Commuter Class Aircraft Policy

    This AD is part of the FAA's aging commuter class airplane policy, 
which briefly states that, when a modification exists that could 
eliminate or reduce the number of required critical inspections, the 
modification should be incorporated.
    The intent of the FAA's aging commuter airplane program is to 
ensure safe operation of commuter-class airplanes that are in 
commercial service without adversely impacting private operators. The 
FAA believes that a large number of the remaining 261 affected 
airplanes (2,384 affected airplanes - 2,123 airplanes with a set of 
parts distributed) that will be affected by this AD are operated in 
various types of air transportation. This includes scheduled passenger 
service, air cargo, and air taxi.
    This AD allows 1,200 hours time-in-service (TIS) after the 
effective date of the AD before mandatory accomplishment of the design 
modification. The average utilization of the fleet for those airplanes 
in air transportation is between 25 to 40 hours TIS per week. Based on 
these figures, operators of commuter-class airplanes involved in 
commercial operation will have to accomplish the required replacement 
within 7 to 12 months after the AD becomes effective. For private 
owners, who typically operate between 100 to 200 hours TIS per year, 
this allows 6 to 12 years before the required replacement will be 
mandatory.
    The FAA established the 1,200 hours TIS replacement compliance time 
based on its engineering evaluation of the problem. Among the issues 
examined during this engineering evaluation were analysis of service 
difficulty reports, the difficulty level of the inspection, and how 
critical the situation would be if cracks occurred in the subject area 
despite accomplishment of the repetitive inspections.
    Usually, the FAA establishes the mandatory design modification 
compliance time on AD's affecting aging commuter-class airplanes upon 
the accumulation of a certain number of hours TIS on the airplane. For 
this action, the FAA is mandating the replacement for all operators 
``within the next 1,200 hours TIS after the effective date of this 
AD.'' The total TIS levels of the airplane fleet vary from under 1,000 
hours TIS to over 5,000 hours TIS, and annual accumulation rates vary 
from 50 hours TIS to over 1,000 hours TIS. Establishing a long-term set 
compliance time of hours TIS accumulated on Piper PA31, PA31P, and 
PA31T series airplanes (such as 5,000 hours TIS) imposes an undue 
burden on the manufacturer of having to maintain a supply of 
replacement parts for the entire fleet when many airplanes in the fleet 
may never reach this compliance time.

[[Page 24880]]

    Instead, the FAA believes that Piper should maintain parts for 
several years; in this case about 12 years to allow low-usage airplanes 
time to accumulate the 1,200 hours TIS after the effective date of the 
AD. The FAA has determined that the compliance time of this AD provides 
the level of safety required for commuter air service while still 
minimizing the impact on the private airplane owners of Piper PA31, 
PA31P, and PA31T series airplanes.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A copy of the final evaluation prepared for this 
action is contained in the Rules Docket. A copy of it may be obtained 
by contacting the Rules Docket at the location provided under the 
caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing Airworthiness Directive 
(AD) 88-05-05, Amendment 39-5861, and by adding a new AD to read as 
follows:

96-10-14  The New Piper Aircraft, Inc. (formerly Piper Aircraft 
Corporation): Amendment 39-9621; Docket No. 90-CE-62-AD. Supersedes 
AD 88-05-05, Amendment 39-5861.

    Applicability: The following model and serial number airplanes, 
certificated in any category, that do not have left and right main 
landing gear (MLG) forward sidebraces of improved design installed, 
part numbers (P/N) 85165-02 (left) and 85165-03 (right) or P/N 
85166-02 (left) and 85166-03 (right).

------------------------------------------------------------------------
               Models                             Serial Nos.           
------------------------------------------------------------------------
PA31, PA31-300, and PA31-325........  31-2 through 31-8312019.          
PA31-350............................  31-5001 through 31-8553002.       
PA31P...............................  31P-2 through 31P-7730012.        
PA31P-350...........................  31P-8414001 through 31P-8414050.  
PA31T...............................  31T-7400002 through 31T-8120104.  
PA31T1..............................  31T-7804001 through 31T-8304003   
                                       and 31T-1104004 through 31T-     
                                       1104017.                         
PA31T2..............................  31T-8166001 through 31T-8166076   
                                       and 31T-1166001 through 31T-     
                                       1166008.                         
------------------------------------------------------------------------

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (g) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.
    Compliance: Required as indicated in the body of this AD, unless 
already accomplished.
    To prevent the MLG from retracting because of a cracked MLG 
forward side brace, which, if not detected and corrected, could 
result in gear collapse and loss of control of the airplane during 
landing operations, accomplish the following:
    (a) Within the next 100 hours time-in-service (TIS) after the 
effective date of this AD, unless already accomplished (compliance 
with AD 88-05-05), and thereafter at intervals not to exceed 100 
hours TIS until the modification required by paragraph (d) of this 
AD is incorporated, inspect (using dye penetrant methods) both the 
left and right MLG sidebraces for cracks. Accomplish the inspections 
in accordance with the INSTRUCTIONS section of Piper Service 
Bulletin No. 845A, dated October 9, 1987.
    (b) The initial dye penetrant inspection type must be utilized 
for all future repetitive inspections. Dye penetrant inspection 
types consist of Type I: fluorescent; Type II: non-fluorescent or 
visible dye; and Type III: dual sensitivity.
    (c) If cracks are found during any of the inspections required 
in paragraph (a) of this AD, prior to further flight, replace the 
cracked MLG sidebrace with a part of improved design, P/N 85165-02 
(left) or 85165-03 (right) or P/N 85166-02 (left) or 85166-03 
(right), as applicable. Accomplish this replacement in accordance 
with the applicable maintenance manual.
    (d) Within the next 1,200 hours TIS after the effective date of 
this AD, unless already accomplished as required by paragraph (c) of 
this AD, replace both the left and right MLG side braces with parts 
of improved design,   P/N 85165-02 (left) and 85165-03 (right) or   
P/N 85166-02 (left) and 85166-03 (right), as applicable. Accomplish 
these replacements in accordance with the applicable maintenance 
manual.
    (e) Installing both the left and right MLG side braces with 
parts of improved design,   P/N 85165-02 (left) and 85165-03 (right) 
or   P/N 85166-02 (left) and 85166-03 (right), as applicable, as 
required by paragraph (d) of this AD is considered terminating 
action for the repetitive inspection requirement of this AD.
    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (g) An alternative method of compliance or adjustment of the 
initial or repetitive compliance times that provides an equivalent 
level of safety may be approved by the Manager, Atlanta Aircraft 
Certification Office (ACO), Campus Building, 1701 Columbia Avenue, 
suite 2-160, College Park, Georgia 30337-2748. The request shall be 
forwarded through an appropriate FAA Maintenance Inspector, who may 
add comments and then send it to the Manager, Atlanta ACO.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Atlanta ACO.
    Note 3: Alternative methods of compliance approved in accordance 
with AD 88-05-05 (superseded by this AD) are not considered approved 
for this AD.

    (h) The inspection required by this AD shall be done in 
accordance with Piper Service Bulletin No. 845A, dated October 9, 
1987. This incorporation by reference was approved by the Director 
of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR 
part 51. Copies may be obtained from The New Piper Aircraft, Inc., 
2926 Piper Drive, Vero Beach, Florida 32960. Copies may be inspected 
at the FAA, Central Region, Office of the Assistant Chief Counsel, 
Room 1558, 601 E. 12th Street, Kansas City, Missouri, or at the 
Office of the Federal Register, 800 North Capitol Street NW., suite 
700, Washington, DC.
    (i) This amendment (39-9621) supersedes AD 88-05-05, Amendment 
39-5861.
    (j) This amendment (39-9621) becomes effective on June 27, 1996.

[[Page 24881]]

    Issued in Kansas City, Missouri, on May 8, 1996.
Henry A. Armstrong,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-12390 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12389 Airworthiness Directives; The New Piper Aircraft, Inc. (Formerly Piper Aircraft Corporation) Models PA31, PA31-300, PA31-325, and PA31- 350 Airplanes
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24881-24883]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12389]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 90-CE-63-AD; Amendment 39-9622; AD 96-10-15]
RIN 2120-AA64

Airworthiness Directives; The New Piper Aircraft, Inc. (Formerly 
Piper Aircraft Corporation) Models PA31, PA31-300, PA31-325, and PA31-
350 Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment supersedes Airworthiness Directive (AD) 80-14-
06, which currently requires the following on The New Piper Aircraft, 
Inc. (Piper) Models PA31, PA31-300, PA31-325, and PA31-350 airplanes: 
repetitively inspecting the outboard flap tracks, wing rib flanges, and 
the rear spar web at Wing Station (WS) 147.5 on each wing, and 
modifying the area at WS 147.5 on both wings if any cracks are found as 
terminating action for the repetitive inspection requirement. The 
Federal Aviation Administration's policy on aging commuter-class 
aircraft is to eliminate or, in certain instances, reduce the number of 
certain repetitive short-interval inspections when improved parts or 
modifications are available. This action retains the repetitive 
inspection requirement of AD 80-14-06, and requires modifying the area 
at WS 147.5 on both wings as terminating action for the repetitive 
inspection requirement. The actions specified in this AD are intended 
to prevent structural failure under certain load conditions caused by 
cracked areas at WS 147.5, which, if not detected and corrected, could 
result in loss of control of the airplane.

DATES: Effective June 27, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of June 27, 1996.

ADDRESSES: Service information that applies to this AD may be obtained 
from The New Piper Aircraft, Inc., Customer Services, 2926 Piper Drive, 
Vero Beach, Florida 32960. This information may also be examined at the 
Federal Aviation Administration (FAA), Central Region, Office of the 
Assistant Chief Counsel, Attention: Rules Docket 90-CE-63-AD, Room 
1558, 601 E. 12th Street, Kansas City, Missouri 64106; or at the Office 
of the Federal Register, 800 North Capitol Street NW., suite 700, 
Washington, DC.

FOR FURTHER INFORMATION CONTACT: Christina Marsh, Aerospace Engineer, 
FAA, Atlanta Aircraft Certification Office, Campus Building, 1701 
Columbia Avenue, suite 2-160, College Park, Georgia 30337-2748; 
telephone (404) 305-7362; facsimile (404) 305-7348.

SUPPLEMENTARY INFORMATION:

Events Leading to the AD

    A proposal to amend part 39 of the Federal Aviation Regulations (14 
CFR part 39) to include an AD that would apply to Piper Models PA31, 
PA31-300, PA31-325, and PA31-350 airplanes was published in the Federal 
Register on December 7, 1995 (60 FR 62779). The action proposed to 
supersede AD 80-14-06 with a new AD that would (1) retain the 
requirement of repetitively inspecting the outboard flap track, wing 
rib flanges, and the rear spar web at WS 147.5 for cracks, and, if any 
cracks are found, modifying the area at WS 147.5 by incorporating Piper 
Kit 763 986 as terminating action for the repetitive inspection 
requirement; and (2) require incorporating Piper Kit 763 986 at a 
specified hours TIS time-period for airplanes where no cracks were 
found during the inspections as terminating action for the repetitive 
inspection requirement. Accomplishment of the modification would be in 
accordance with the instructions included with Piper Kit 763 986, 
Revised April 15, 1991, as referenced in Piper SB No. 647A, dated 
November 24, 1980.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. No comments were received on the 
proposed rule or the FAA's determination of the cost to the public.
    After careful review of all available information related to the 
subject presented above, the FAA has determined that air safety and the 
public interest require the adoption of the rule as proposed except for 
minor editorial corrections. The FAA has determined that these minor 
corrections will not change the meaning of the AD and will not add any 
additional burden upon the public than was already proposed.

Cost Impact

    The FAA estimates that 2,906 airplanes in the U.S. registry will be 
affected by this AD, that it will take approximately 30 workhours per 
airplane to accomplish the required modification, and that the average 
labor rate is approximately $60 an hour. Parts cost approximately $468 
per airplane. Based on these figures, the total cost impact of the 
required modification on U.S. operators is estimated to be $6,590,808 
or $2,268 per airplane. This figure is based on the assumption that no 
affected airplane owner/operator has accomplished the required 
modification.
    Piper has informed the FAA that parts have been distributed to 
enough owners/operators to equip 234 of the affected airplanes. 
Assuming that each set of parts has been installed on an affected 
airplane, the cost impact of this AD upon U.S. owners operators of the 
affected airplanes is reduced by $530,712 from $6,590,808 to 
$6,060,096.

The FAA's Aging Commuter Class Aircraft Policy

    This AD is part of the FAA's aging commuter class airplane policy, 
which briefly states that, when a modification exists that could 
eliminate or reduce the number of required critical inspections, the 
modification should be incorporated.
    The intent of the FAA's aging commuter airplane program is to 
ensure safe operation of commuter-class airplanes that are in 
commercial service without adversely impacting private operators. The 
FAA believes that a large number of the remaining 2,672 affected 
airplanes (2,906 airplanes--234 sets of parts distributed) that will be 
affected by this AD are operated in various types of air 
transportation. This includes scheduled passenger service, air cargo, 
and air taxi.
    This AD allows 1,000 hours time-in-service (TIS) after the 
effective date of the AD before mandatory accomplishment of the design 
modification. The average utilization of the fleet for those airplanes 
in air transportation is between 25 to 40 hours TIS per week. Based on 
these figures, operators of commuter-class airplanes involved in 
commercial operation will have to accomplish the required modification 
within 6 to 10 months after this AD becomes effective. For private 
owners, who typically operate between 100 to 200 hours TIS per year, 
this allows 5 to 10 years before the required modification is 
mandatory.
    The FAA established the 1,000 hours TIS modification compliance 
time based on its engineering evaluation of the problem. Among the 
issues examined during this engineering evaluation were analysis of 
service difficulty reports, the

[[Page 24882]]

difficulty level of the inspection, and how critical the situation 
would be if cracks occurred in the subject area despite accomplishment 
of the repetitive inspections.
    Usually, the FAA establishes the mandatory design modification 
compliance time on AD's affecting aging commuter-class airplanes upon 
the accumulation of a certain number of hours TIS on the airplane. For 
this action, the FAA is mandating the modification for all operators 
``within the next 1,000 hours TIS after the effective date of this 
AD.'' The total TIS levels of the airplane fleet vary from under 1,000 
hours TIS to over 5,000 hours TIS, and annual accumulation rates vary 
from 50 hours TIS to over 1,000 hours TIS. Establishing a long-term set 
compliance time of hours TIS accumulated on a Piper Model PA31, PA31-
300, PA31-325, or PA31-350 airplane (such as 5,000 hours TIS) imposes 
an undue burden on the manufacturer of having to maintain a supply of 
replacement parts for the entire fleet when many airplanes in the fleet 
may never reach this compliance time.
    Instead, the FAA believes that Piper should maintain parts for 
several years; in this case about 10 years to allow low-usage airplanes 
time to accumulate the ``1,000 hours TIS after the effective date of 
the AD.'' The FAA has determined that the compliance time of this AD 
provides the level of safety required for commuter air service while 
still minimizing the impact on the private airplane owners of Piper 
Models PA31, PA31-300, PA31-325, and PA31-350 airplanes.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A copy of the final evaluation prepared for this 
action is contained in the Rules Docket. A copy of it may be obtained 
by contacting the Rules Docket at the location provided under the 
caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing Airworthiness Directive 
(AD) 80-14-06, Amendment 39-3805, and by adding a new AD to read as 
follows:

96-10-15  The New Piper Aircraft, Inc. (formerly Piper Aircraft 
Corporation): Amendment 39-9622; Docket No. 90-CE-63-AD. Supersedes 
AD 80-14-06, Amendment 39-3805.

    Applicability: The following model and serial number airplanes, 
certificated in any category, that do not have Piper Kit 763 986 
incorporated in the area of Wing Station (WS) 147.5:

------------------------------------------------------------------------
               Models                             Serial Nos.           
------------------------------------------------------------------------
PA31 and PA31-300...................  31-2 through 31-8012010.          
PA31-325............................  31-7512006 through 31-8012010.    
PA31-350............................  31-5001 through 31-8052025.       
------------------------------------------------------------------------

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (f) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated in the body of this AD, unless 
already accomplished.
    To prevent structural failure under certain load conditions 
caused by cracked areas at WS 147.5, which, if not detected and 
corrected, could result in loss of control of the airplane, 
accomplish the following:
    (a) Within the next 100 hours time-in-service (TIS) after the 
effective date of this AD, unless already accomplished (compliance 
with AD 80-14-06), and thereafter at intervals not to exceed 100 
hours TIS until the modification required by paragraph (b) or (c) of 
this AD is incorporated, inspect the outboard flap tracks, wing rib 
flanges, and the rear spar web on both wings in the area of WS 147.5 
by accomplishing the following:
    (1) Lower the flaps to 40 degrees.
    (2) Inspect the attachment of the flap track rib to the rear 
spar on the inboard and outboard sides of the flap track using 10-
power magnification.
    (3) Remove the rectangular access plate from the bottom wing 
skin. The rectangular access plate is located forward of the wing 
spar at WS 153.
    (4) Inspect the WS 147.5 rib attachment angle using 10-power 
magnification.

    Note 2: The 100-hour TIS repetitive inspection interval was 
established to coincide with regularly scheduled maintenance.

    (b) If cracks are found during any of the inspections required 
in paragraph (a) of this AD, prior to further flight, incorporate 
Piper Kit 763 986 in accordance with the instructions included with 
Piper Kit 763 986, Revised April 15, 1991, as referenced in Piper SB 
No. 647A, dated November 24, 1980.
    (c) Within the next 1,000 hours TIS after the effective date of 
this AD, unless already accomplished as required by paragraph (b) of 
this AD, incorporate Piper Kit 763 986 in the area of WS 147.5. 
Accomplish this action in accordance with the instructions included 
with Piper Kit 763 986, Revised April 15, 1991, as referenced in 
Piper SB No. 647A, dated November 24, 1980.
    (d) Incorporating Piper Kit 763 986 as required by paragraphs 
(b) and (c) of this AD is considered terminating action for the 
repetitive inspection requirement of this AD.
    (e) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (f) An alternative method of compliance or adjustment of the 
initial or repetitive compliance times that provides an equivalent 
level of safety may be approved by the Manager, Atlanta Aircraft 
Certification Office (ACO), Campus Building, 1701 Columbia Avenue, 
suite 2-160, College Park, Georgia 30337-2748. The request shall be 
forwarded through an appropriate FAA Maintenance Inspector, who may 
add comments and then send it to the Manager, Atlanta ACO.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Atlanta ACO.

    Note 4: Alternative methods of compliance approved in accordance 
with AD 80-14-06 (superseded by this action) are not considered 
approved as alternative methods of compliance with this AD.

[[Page 24883]]

    (g) The modification required by this AD shall be done in 
accordance with the instructions included with Piper Kit 763 986, 
Revised April 15, 1991. This incorporation by reference was approved 
by the Director of the Federal Register in accordance with 5 U.S.C. 
552(a) and 1 CFR part 51. Copies may be obtained from The New Piper 
Aircraft, Inc., 2926 Piper Drive, Vero Beach, Florida 32960. Copies 
may be inspected at the FAA, Central Region, Office of the Assistant 
Chief Counsel, Room 1558, 601 E. 12th Street, Kansas City, Missouri, 
or at the Office of the Federal Register, 800 North Capitol Street, 
NW., suite 700, Washington, DC.
    (h) This amendment (39-9622) supersedes AD 80-14-06, Amendment 
39-3805.
    (i) This amendment (39-9622) becomes effective on June 27, 1996.

    Issued in Kansas City, Missouri, on May 8, 1996.
Henry A. Armstrong,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-12389 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12373 Prohibited/Restricted Merchandise; Enforcement of Foreign Assets Control Regulations
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24888-24889]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12373]

-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY
19 CFR Parts 12, 145, and 161

[T.D. 96-42]
RIN 1515-AB91

Prohibited/Restricted Merchandise; Enforcement of Foreign Assets 
Control Regulations

AGENCY: Customs Service, Treasury.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document amends the Customs Regulations to more clearly 
provide that Customs enforces the laws and regulations of the Office of 
Foreign Assets Control (OFAC) of the Department of the Treasury 
regarding economic sanctions applicable to those countries that have 
been designated by the President as constituting a threat to the 
national security, foreign policy, or economy of the United States. 
Currently, the Customs Regulations refer to OFAC regulations only in 
the context of merchandise arriving by mail. This document clarifies 
that Customs enforces the laws and regulations administered by OFAC 
regardless of how subject merchandise, services, and technology arrive 
in or depart from the U.S.

EFFECTIVE DATE: May 17, 1996.

FOR FURTHER INFORMATION CONTACT: Louis Alfano, Office of Field 
Operations, Commercial Enforcement Branch, (202) 927-0005.

SUPPLEMENTARY INFORMATION:

Background

    As part of Customs continuing effort to ensure that its regulations 
are informative and up-to-date, Customs has determined that its 
regulations do not clearly set forth the fact that Customs enforces the 
laws and regulations administered by the Office of Foreign Assets 
Control (OFAC) of the Department of the Treasury (31 CFR Chapter V). 
These laws include the Trading With the Enemy Act (50 U.S.C. App. 1-
44), the National Emergencies Act (50 U.S.C. 1641 et seq.), the 
International Emergency Economic Powers Act (50 U.S.C. 1701-1706), and 
the International Security and Development Cooperation Act (22 U.S.C. 
2349aa8-9); the regulations are found at Chapter V of Title 31 of the 
Code of Federal Regulations (Money and Finance) (31 CFR Chapter V). 
These laws and regulations impose prohibitions or restrictions on 
importations, exportations, and other transactions involving funds, 
merchandise, services, and technology with and of those countries that 
have been designated by the President, pursuant to applicable statutory 
provisions. Currently, the Customs Regulations refer to OFAC 
regulations only in part 145 of the Customs Regulations (19 CFR Part 
145), the provisions of which apply only to merchandise arriving by 
mail. This document clarifies that Customs enforces the laws and 
regulations administered by OFAC regardless of how the subject 
merchandise, services, and technology arrive in or depart from the U.S. 
by amending three sections in as many parts to provide further notice 
to the public of Customs enforcement obligations concerning the 
application of economic sanctions to designated countries.
    In reviewing Sec. 145.56 of the Customs Regulations (19 CFR 
145.56), which concerns the applicability of OFAC controls on 
merchandise arriving by mail, Customs has determined that the listing 
of countries subject to controls administered by OFAC is not up-to-
date. (The list of countries in the section has not been updated since 
the section was promulgated in 1973 and is outdated and inconsistent 
with OFAC regulations: two of the four countries currently listed are 
no longer subject to OFAC's controls (North Vietnam (now Vietnam) and 
Rhodesia (now Zimbabwe)) and other countries that have since been 
designated by the President as subject to sanctions have not been added 
to the list). Each time the President sanctions and lifts sanctions on 
designated countries, OFAC amends its regulations accordingly. 
Repeating the list of sanctioned countries in the Customs Regulations 
merely duplicates the efforts of OFAC and, if not done timely, could 
result in future inconsistencies between OFAC and Customs Regulations. 
Accordingly, Customs has determined that to avoid the possibility of 
future inconsistencies between OFAC and Customs Regulations in the 
listing of sanctioned countries, Customs will no longer set forth such 
a list in its regulations, but will simply refer readers to the OFAC 
regulations. Thus, in amending Sec. 145.56, this document retains the 
procedural provisions, but removes the listing of countries subject to 
economic sanctions.
    This document also clarifies the extent of Customs responsibility 
in enforcing OFAC controls by adding sections regarding OFAC controls 
in both Part 12, which concerns regulations of various Federal agencies 
which Customs enforces and special classes of merchandise, and in Part 
161, which concerns general enforcement provisions. A new Sec. 12.150 
is added to Part 12, which cross-references OFAC regulations at 31 CFR 
Chapter V, explains how OFAC regulations work, and provides an address 
for further information from OFAC. Also, a specific authority citation 
is added to account for Customs import (19 U.S.C. 1595a(c)) and export 
(22 U.S.C 401) seizure authority and to account for the terms and 
conditions for release (19 U.S.C. 1618). Section 161.2 is amended to 
list OFAC as an agency whose laws are enforced by Customs. Also, the 
parenthetical legal authority citations at the end of Sec. 161.2 are 
amended to account for changes in the law since 1972, when the 
citations were first provided, and are placed under the general 
authority citation at the beginning of Part 161.

Inapplicability of Public Notice and Comment Requirements, Delayed 
Effective Date Requirements, the Regulatory Flexibility Act, and 
Executive Order 12866

    Because this amendment merely provides further notice to the public 
that Customs enforces the laws and regulations administered by the 
Office of Foreign Assets Control of the Department of the Treasury, 
pursuant to 5 U.S.C. 553(b)(B), good cause exists for dispensing with 
notice and public procedure thereon as unnecessary. For the same 
reasons, good cause exists for dispensing with a delayed effective date 
under 5 U.S.C. 553(d)(1) and (d)(3). Since this document is not subject 
to the notice and public procedure requirements of 5 U.S.C. 553, it is 
not subject to provisions of the Regulatory Flexibility Act (5 U.S.C. 
601 et seq.). This document does not meet the criteria for a 
``significant regulatory action'' as specified in E.O. 12866.

List of Subjects

19 CFR Part 12

    Customs duties and inspection, Economic sanctions, Imports, 
Licensing, Prohibited merchandise, Restricted merchandise, Reporting 
and recordkeeping requirements, Sanctions, Seizure and forfeiture.

[[Page 24889]]

19 CFR Part 145

    Customs duties and inspection, Imports, Mail, Postal service, 
Prohibited merchandise, Restricted merchandise, Reporting and 
recordkeeping requirements, Seizure and forfeiture.

19 CFR Part 161

    Customs duties and inspection, Imports, Law enforcement.

Amendments to the Regulations

    For the reasons stated above, parts 12, 145, and 161 of the Customs 
Regulations (19 CFR parts 12, 145, and 161), are amended as set forth 
below:

PART 12--SPECIAL CLASSES OF MERCHANDISE

    1. The general authority citation for Part 12 continues and a 
specific authority citation for new Sec. 12.150 is added to read as 
follows:

    Authority: 5 U.S.C. 301; 19 U.S.C. 66, 1202 (General Note 20, 
Harmonized Tariff Schedule of the United States (HTSUS)), 1624;
* * * * *
    Section 12.150 also issued under 19 U.S.C. 1595a and 1618; 22 
U.S.C. 401.

    2. Part 12 is amended by adding a centerheading and new Sec. 12.150 
to read as follows:

Merchandise Subject to Economic Sanctions

Sec. 12.150  Merchandise prohibited by economic sanctions; detention; 
seizure or other disposition; blocked property.

    (a) Generally. Merchandise from certain countries designated by the 
President as constituting a threat to the national security, foreign 
policy, or economy of the United States shall be detained until the 
question of its release, seizure, or other disposition has been 
determined under law and regulations issued by the Treasury 
Department's Office of Foreign Assets Control (OFAC) (31 CFR Chapter 
V).
    (b) Seizure. When an unlicensed importation of merchandise subject 
to OFAC's regulations is determined to be prohibited, no entry for any 
purpose shall be permitted and, unless the immediate reexportation or 
other disposition of such merchandise under Customs supervision has 
previously been authorized by OFAC, the merchandise shall be seized.
    (c) Licenses. OFAC's regulations may authorize OFAC to issue 
licenses on a case-by-case basis authorizing the importation of 
otherwise prohibited merchandise under certain conditions. If such a 
license is issued subsequent to the attempted entry and seizure of the 
merchandise, importation shall be conditioned upon the importer:
    (1) Agreeing in writing to hold the Government harmless, and
    (2) Paying any storage and other Customs fees, costs, or expenses, 
as well as any mitigated forfeiture amount or monetary penalty imposed 
or assessed by Customs or OFAC, or both.
    (d) Blocked property. Merchandise which constitutes property in 
which the government or any national of certain designated countries 
has an interest may be blocked (frozen) pursuant to OFAC's regulations 
and may not be transferred, sold, or otherwise disposed of without an 
OFAC license.
    (e) Additional information. For further information concerning 
importing merchandise prohibited under economic sanctions programs 
currently in effect, the Office of Foreign Assets Control of the 
Department of the Treasury should be contacted. The address of that 
office is 1500 Pennsylvania Ave., N.W., Annex 2nd Floor, Washington, 
D.C. 20220.

PART 145--MAIL IMPORTATIONS

    1. The general authority citation for Part 145 is revised to read 
as follows:

    Authority: 19 U.S.C. 66, 1202 (General Note 20, Harmonized 
Tariff Schedule of the United States), 1624;
* * * * *

Sec. 145.56  [Amended]

    2. Section 145.56 is amended by removing the words ``North Korea, 
North Vietnam, Cuba, or Rhodesia'' and adding, in their place, the 
words ``certain designated countries''; and by adding the parenthetical 
words ``(See also 19 CFR 12.150)'' at the end of the section before the 
period.

PART 161--GENERAL ENFORCEMENT PROVISIONS

    1. The general authority citation for Part 161 is revised, and a 
specific authority citation for section 161.2 is added, to read as 
follows:

    Authority: 5 U.S.C. 301; 19 U.S.C. 66, 1600, 1619, 1624, 1646a;
    Section 161.2 also issued under 12 U.S.C. 95a; 18 U.S.C. 545; 19 
U.S.C. 1595(a); 22 U.S.C. 401, 1934, 2349aa8-9;
    42 U.S.C. 1804, 1807; 50 U.S.C. 1641 et seq., 1701 et seq.;
    50 U.S.C. App. 1-44, 2411.
* * * * *
    2. Section 161.2 is amended by adding paragraph (a)(3) and removing 
the parenthetical authority citations at the end of the section. The 
revision reads as follows:

Sec. 161.2  Enforcement for other agencies.

    (a) * * *
    (1) * * *
    (2) * * *
    (3) Importations, exportations, and transactions involving 
identified goods, services, and technology with any of those countries 
designated as subject to economic sanctions under the laws and 
regulations administered by the Office of Foreign Assets Control of the 
Department of the Treasury.
* * * * *
Michael H. Lane,
Acting Commissioner of Customs.
    Approved: April 8, 1996.
John P. Simpson,
Deputy Assistant Secretary of the Treasury.
[FR Doc. 96-12373 Filed 5-16-96; 8:45 am]
BILLING CODE 4820-02-P

Complete official Federal Register PDF

FR Doc. 96-12372 Removal of Customs Regulations Relating to the Steel Voluntary Restraint Arrangement Program
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24887-24888]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12372]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Customs Service

19 CFR Part 10

[T.D. 96-41]
RIN 1515-AB04

Removal of Customs Regulations Relating to the Steel Voluntary 
Restraint Arrangement Program

AGENCY: U.S. Customs Service, Department of the Treasury.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: On September 13, 1990, T.D. 90-70 was published in the Federal 
Register (55 FR 37701) to set forth interim amendments to the Customs 
Regulations regarding the entry requirements applicable to imported 
steel products which are subject to voluntary restraint arrangements 
negotiated between the United States and certain steel-exporting 
countries. This document removes those interim regulations as a 
consequence of the expiration of the steel voluntary restraint 
arrangement program.

EFFECTIVE DATE: May 17, 1996.

FOR FURTHER INFORMATION CONTACT: Frank Crowe, Office of Field 
Operations (202-927-0164).

SUPPLEMENTARY INFORMATION:

Background

    On September 13, 1990, Customs published in the Federal Register 
T.D. 90-70, 55 FR 37701, which amended Part 10 of the Customs 
Regulations (19 CFR Part 10) by setting forth interim regulations 
concerning entry requirements applicable to imported steel products 
subject to voluntary restraint arrangements (VRAs) negotiated between 
the United States and certain steel-exporting countries and enforced 
under the Steel Import Stabilization Act (title VIII of Public Law 98-
573, codified at 19 U.S.C. 2253 note), as amended by the Steel Trade 
Liberalization Program Implementation Act (Public Law 101-221, 103 
Stat. 1886). The interim regulations consisted of new Secs. 10.321-
10.323 (19 CFR 10.321-10.323) and set forth, in Sec. 10.323, the basic 
requirement that a valid and properly executed original export 
certificate or export license, issued by the country of origin of the 
products, shall be submitted at the time of entry of each shipment of 
arrangement products. The interim regulations went into effect on the 
date of publication. On October 22, 1990, Customs published a document 
in the Federal Register at 55 FR 42556 to correct the interim 
regulations by removing paragraph (d) from new interim section 10.323, 
with effect from September 13, 1990. No document was ever published in 
the Federal Register adopting the interim regulations as a final rule.
    As noted in the background discussion set forth in T.D. 90-70, 
section 3(a) of the Steel Trade Liberalization Program Implementation 
Act, cited above, extended the President's authority to enforce the 
VRAs until March 31, 1992, and it was for this reason that 
Sec. 10.322(a) of the interim regulations, in defining the term 
``arrangement'' for purposes of Sec. 10.323, referred specifically to a 
period extending only through that date. Thus, in the absence of a 
further extension of the President's authority and a consequential 
amendment to the interim regulations, it was intended that those 
regulations would by their own terms cease to have effect after March 
31, 1992.
    Since no action was taken by Congress to extend the President's VRA 
enforcement authority beyond March 31, 1992, that authority, and thus 
in effect the VRA program itself, expired on that date and Customs 
thereafter ceased to enforce the interim regulatory provisions. 
Accordingly, because those interim regulations no longer have any 
purpose or effect, Customs believes that it is appropriate to remove 
them.

Inapplicability of Notice and Delayed Effective Date Requirements

    Since this amendment merely conforms the Customs Regulations to 
current legal requirements and has no substantive effect on the public, 
pursuant to the provisions of 5 U.S.C. 553(b)(B), it is determined that 
notice and public procedures thereon are unnecessary. For the same 
reasons, it is determined under the provisions of 5 U.S.C. 553(d)(3) 
that good cause exists for dispensing with a delayed effective date.

Executive Order 12866

    This document does not meet the criteria for a ``significant 
regulatory action'' as specified in Executive Order 12866.

Regulatory Flexibility Act

    Pursuant to the provisions of the Regulatory Flexibility Act (5 
U.S.C. 601 et seq.), it is certified that the amendment will not have a 
significant economic impact on a substantial number of small entities 
because the amendment merely removes regulatory provisions that have 
already ceased to have legal effect. Accordingly, the amendment is not 
subject to the regulatory analysis or other requirements of 5 U.S.C. 
603 and 604.

Drafting Information

    The principal author of this document was Francis W. Foote, Office 
of Regulations and Rulings, U.S. Customs Service. However, personnel 
from other offices participated in its development.

List of Subjects in 19 CFR Part 10

    Customs duties and inspections, Imports, Steel products.

Amendments to the Regulations

    Accordingly, for the reasons set forth above, Part 10, Customs 
Regulations (19 CFR Part 10), is amended as set forth below.

PART 10--ARTICLES CONDITIONALLY FREE, SUBJECT TO A REDUCED RATE, 
ETC.

    1. The general authority citation for Part 10 continues to read as 
follows, and the specific authority citation for Secs. 10.321 through 
10.323 is removed:

    Authority: 19 U.S.C. 66, 1202 (General Note 20, Harmonized 
Tariff Schedule of the United States), 1321, 1481, 1484, 1498, 1508, 
1623, 1624, 3314;
* * * * *

[[Page 24888]]

Sec. 10.321 through 10.323  [Removed]

    2. Sections 10.321 through 10.323 and their center heading are 
removed.
George J. Weise,
Commissioner of Customs.

    Approved: April 29, 1996.
John P. Simpson,
Deputy Assistant Secretary of the Treasury.
[FR Doc. 96-12372 Filed 5-16-96; 8:45 am]
BILLING CODE 4820-02-P

Complete official Federal Register PDF

FR Doc. 96-12351 Allyl Isothiocyanate as a Component of Food Grade Oil of Mustard; Exemption From the Requirement of a Tolerance
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24893-24894]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12351]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 180

[PP 5F4445/R2235; FRL-5366-4]

Allyl Isothiocyanate as a Component of Food Grade Oil of Mustard; 
Exemption From the Requirement of a Tolerance

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule establishes an exemption from the requirement for a 
tolerance for residues of the insecticide and repellent, Allyl 
isothiocyanate (as a component of food grade Oil of Mustard), in or on 
all raw agricultural commodities, when applied according to approved 
labeling. Champon 100% Natural Products, Inc. of Boca Raton, Florida, 
requested this exemption.

EFFECTIVE DATE: This regulation becomes effective May 17, 1996.

ADDRESSES:  Written objections and hearing requests, identified by the 
document control number, [[PP 5F4445/R2235], may be submitted to: 
Hearing Clerk (1900), Environmental Protection Agency, Rm. M3708, 401 M 
St., SW., Washington, DC 20460. Fees accompanying objections and 
hearing requests shall be labeled ``Tolerance Petition Fees'' and 
forwarded to: EPA Headquarters Accounting Operations Branch, OPP 
(Tolerance Fees), P.O. Box 360277M, Pittsburgh, PA 15251. A copy of any 
objections and hearing requests filed with the Hearing Clerk should be 
identified by the document control number and submitted to: Public 
Response and Program Resources Branch, Field Operations Division 
(7506C), Office of Pesticide Programs, Environmental Protection Agency, 
401 M St., SW., Washington, DC 20460. In person, bring copy of 
objections and hearing requests to: Rm. 1132, CM #2, 1921 Jefferson 
Davis Hwy., Arlington, VA 22202.
    A copy of objections and hearing requests filed with the Hearing 
Clerk may also be submitted electronically by sending electronic mail 
(e-mail) to: [email protected]. Copies of objections and 
hearing requests must be submitted as an ASCII file avoiding the use of 
special characters and any form of encryption. Copies of objections and 
hearing requests will also be accepted on disks in WordPerfect in 5.1 
file format or ASCII file format. All copies of objections and hearing 
requests in electronic form must be identified by the docket number [PP 
5F4445/R2235]. No Confidential Business Information (CBI) should be 
submitted through e-mail. Electronic copies of objections and hearing 
requests on this rule may be filed online at many Federal Depository 
Libraries. Additional information on electronic submissions can be 
found below in this document.

FOR FURTHER INFORMATION CONTACT: By mail: Robert Forrest, Product 
Manager (PM) 14, Registration Division (7505C), Environmental 
Protection Agency, 401 M St., SW., Washington, DC 20460. Office 
location and telephone number: Rm. 219, CM #2, 1921 Jefferson Davis 
Highway, Arlington, VA 22202. (703) [305-6600].

SUPPLEMENTARY INFORMATION: In the Federal Register of October 25, 1995, 
(60 FR 54689), EPA issued a notice that Champon 100% Natural Products, 
Inc., had submitted pesticide petition (PP) 5F4445 to EPA proposing to 
amend 40 CFR part 180 by establishing a regulation pursuant to section 
408 of the Federal Food, Drug, and Cosmetic Act (FFDCA), 21 U.S.C. 
346a(d), ``... to establish an exemption from the requirement of a 
tolerance for allyl isothiocyanate (a component of oil of mustard) in 
or on all fruits and vegetables, nuts, berries, and grains.'' There 
were no public comments received as a result of the publication of the 
notice of filing.
     Allyl isothiocyanate, the subject of this exemption request, is a 
component of Oil of Mustard. The Agency has registered this active 
ingredient as a dog or cat repellent since 1962. Then, in 1991, the 
Agency registered three products as an insecticide and repellent to 
Champon 100% Natural Products for non-food/non-feed uses. This 
exemption request expands the use of this active ingredient for food/
feed uses.
    The Agency has evaluated the data and other relevant material 
submitted with the petition or obtained from other sources. These data 
and material show that:
    1. Allyl isothiocyanate, as a component of oil of mustard, is on 
the Food and Drug Administration (FDA) Generally Recognized as Safe 
(GRAS) list (21 CFR 182.10, 182.20, 582.10 and 582.20).

[[Page 24894]]

    2. Oil of Mustard, as a component of household Yellow Mustard and 
Brown Mustard, has been used in a variety of food products [baked 
goods, oils, meats, processed vegetables, snack foods, soups, nut 
products, and gravies at concentrations up to 18,344 parts per million 
(ppm)], for a long time, without any known deleterious health effects.
    3. The Acute Oral LD50 for Allyl isothiocyanate, in rats, is 
339 mg/kg body weight (Toxicity Category II). An end-use formulation, 
as applied, contains only 0.2% Allyl isothiocyanate, which represents a 
500-fold dilution of active ingredient.
    4. The Acute Oral LD50 for Oil of Mustard, in rats, is 14.8 g/
kg body weight (Toxicity Category IV).
    The toxicology data and other information provided are sufficient 
to demonstrate that there are no foreseeable human health hazards 
likely to arise from the use of the insecticide, Allyl isothiocyanate 
(as a component of food grade Oil of Mustard), in or all raw 
agricultural commodities.
    This pesticide/repellent is considered useful for the purpose for 
which the exemption from tolerance is sought and capable of achieving 
its physical or technical effect.
    Based on the information considered, the Agency concludes that 
establishment of a tolerance is not necessary to protect the public 
health. Therefore, the exemption from tolerance is established as set 
forth below.
    Any person adversely affected by this regulation may, within 30 
days after publication of this document in the Federal Register, file 
written objections to the regulation and may also request a hearing on 
those objections. Objections and hearing requests must be filed with 
the Hearing Clerk, at the address given above (40 CFR 178.20). A copy 
of the objections and/or hearing requests filed with the Hearing Clerk 
should be submitted to the OPP docket for this rulemaking. The 
objections submitted must specify the provisions of the regulation 
deemed objectionable and the grounds for the objections (40 CFR 
178.25). Each objection must be accompanied by the fee prescribed by 40 
CFR 180.33(i). If a hearing is requested, the objections must include a 
statement of the factual issue(s) on which a hearing is requested, the 
requestor's contentions on such issues, and a summary of any evidence 
relied upon by the objector (40 CFR 178.27). A request for a hearing 
will be granted if the Administrator determines that the material 
submitted shows the following: There is genuine and substantial issue 
of fact; there is reasonable possibility that available evidence 
identified by the requestor would, if established, resolve one or more 
of such issues in favor of the requestor, taking into account 
uncontested claims or facts to the contrary; and resolution of the 
factual issue(s) in the manner sought by the requestor would be 
adequate to justify the action requested (40 CFR 178.32).
    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to all the requirements of the Executive Order 
(i.e., Regulatory Impact Analysis, review by the Office of Management 
and Budget (OMB)). Under section 3(f), the order defines 
``significant'' as those actions likely to lead to a rule (1) having an 
annual effect on the economy of $100 million or more, or adversely and 
materially affecting a sector of the economy, productivity, 
competition, jobs, the environment, public health or safety, or State, 
local or tribal governments or communities (also known as 
``economically significant''); (2) creating serious inconsistency or 
otherwise interfering with an action taken or planned by another 
agency; (3) materially altering the budgetary impacts of entitlement, 
grants, user fees, or loan programs; or (4) raising novel legal or 
policy issues arising out of legal mandates, the President's 
priorities, or the principles set forth in this Executive Order.
    Pursuant to the terms of this Executive Order, EPA has determined 
that this rule is not ``significant'' and is therefore not subject to 
OMB review. In addition, this action does not impose any enforceable 
duty, or contain any ``unfunded mandates'' as described in Title II of 
the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4), or require 
prior consultation as specified by Executive Order 12875 (58 FR 58093, 
October 28, 1993), entitled Enhancing the Intergovernmental 
Partnership, or special considerations as required by Executive Order 
12898 (59 FR 7629, February 16, 1994).
    Pursuant to the requirements of the Regulatory Flexibility Act 
(Pub. L. 96-354, 94 Stat. 1164, 5 U.S.C. 601-612), the Administrator 
has determined that regulations establishing new tolerances or raising 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant economic impact on a substantial number of 
small entities. A certification statement to this effect was published 
in the Federal Register of May 4, 1981 (46 FR 24950).

List of Subjects in 40 CFR Part 180

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Pesticides and pests, Reporting and 
recordkeeping requirements.

    Dated: May 8, 1996.

Daniel M. Barolo,
Director, Office of Pesticide Programs.

PART 180--[AMENDED]

    Therefore, 40 CFR Part 180 is amended as follows:

    1. The authority citation for part 180 continues to read as 
follows:

    Authority: 21 U.S.C. 346A and 371.

    2. By adding Sec. 180.1167 to subpart D to read as follows:

Sec. 180.1167   Allyl isothiocyanate as a component of food grade oil 
of mustard; exemption from the requirement of a tolerance.

    The insecticide and repellent Allyl isothiocyanate is exempt from 
the requirement of a tolerance for residues when used as a component of 
food grade oil of mustard, in or on all raw agricultural commodities, 
when applied according to approved labeling.
[FR Doc. 96-12351 Filed 5-16-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-12341 Capital Leases
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 25088-25090]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12341]

[[Page 25087]]

_______________________________________________________________________

Part III

Department of Transportation

_______________________________________________________________________

Federal Transit Administration

_______________________________________________________________________

49 CFR Part 639

Capital Leases; Final Rule

Federal Register / Vol. 61, No. 97 / Friday, May 17, 1996 / Rules and 
Regulations

[[Page 25088]]

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

49 CFR Part 639

[Docket No. FTA-96-1031]
RIN 2132-AA55

Capital Leases

AGENCY: Federal Transit Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule amends ``Capital Leases'' to treat maintenance 
costs under a commercial lease of a capital asset as an eligible 
capital expense. ``Capital Leases'' implements section 308 of the 
Surface Transportation and Uniform Relocation Assistance Act of 1987, 
which allows capital grants under the Federal transit laws to be used 
for leasing facilities or equipment if a lease is more cost effective 
than purchase or construction of such items. FTA believes that this 
amendment is consistent with industry practice and with recent Federal 
initiatives to streamline federally assisted procurement practices and 
to ensure that Federal investment in the nation's transportation 
infrastructure is properly protected.

EFFECTIVE DATE: June 17, 1996.

ADDRESS: United States Department of Transportation, Central Dockets 
Office, P-125, 400 Seventh Street, S.W., Washington, D.C. 20590.

FOR FURTHER INFORMATION CONTACT: Rita Daguillard, Deputy Assistant 
Chief Counsel, Office of Chief Counsel, (202) 366-1936, or Douglas 
Kerr, Office of Program Guidance and Support, (202) 366-1656.

I. Supplementary Information

A. -Background

    Under 49 U.S.C. 5307, Federal funds are provided to urbanized areas 
on the basis of a statutory formula. These funds are available for the 
acquisition or construction of mass transportation facilities and 
equipment (``capital assistance grants''), as well as for payment of a 
portion of the net operating cost of mass transportation facilities and 
equipment (``operating assistance grants'').
    Historically, Federal Transit Administration (FTA) recipients had 
the discretion to acquire capital assets by long-term or short-term 
lease, but few did so, since the significant portion of the lease cost 
(as much as forty percent) representing imputed interest was ineligible 
for reimbursement under Office of Management and Budget (OMB) cost 
principles (OMB Circular A-87, ``Cost Principles for State, Local, and 
Indian Tribal Governments'').
    In 1987, section 308 of the Surface Transportation and Uniform 
Relocation Assistance Act, Public Law 100-17 (STURAA), expressly 
authorized the use of section 5307 capital assistance funds to acquire 
facilities and equipment by lease where leasing is more cost effective 
than purchase or construction. As explained in the accompanying Senate 
Report, section 308

 -permits grantees to use [section 5307] grant funds to lease major 
capital cost items such as computers, maintenance of way and other 
heavy equipment, maintenance of effort rail equipment, radio 
equipment, bus garages, property or structures for park and ride, 
and other buildings or facilities used for mass transit purposes. 
The Committee recognizes that it is often more cost effective for 
grantees to lease rather than purchase major capital items. Leasing 
arrangements can also provide transit authorities with flexibility 
that is needed, for example, to maintain technological advance in 
their communications and computing equipment or to adapt buildings 
and other facilities to changing needs. By including this section, 
the Committee intends to help grantees better manage their 
operations and conduct long-term and short-term planning.

S. Rep. No. 3, 100th Cong., 1st Sess. 6 (1987).
    On October 15, 1991, FTA issued 49 CFR Part 639 (56 FR 51786), 
which implements section 308. The rule provides that capital grants 
under section 5307 may be used for leasing facilities or equipment if 
leasing is more cost effective than purchase or construction of such 
items. Section 639.27 lists maintenance costs among the factors that a 
recipient may consider in making its cost-effectiveness determination. 
Section 639.17, provides that ``only costs directly attributable to 
making a capital asset available to the lessee are eligible for capital 
assistance'' and cites as examples finance charges and ancillary costs 
such as delivery and installation charges.

B. -The Notice of Proposed Rulemaking

    On January 31, 1996, FTA issued a notice of proposed rulemaking 
(NPRM) that would amend section 639.17 to recognize maintenance costs 
as ``costs directly attributable to making a capital asset available to 
the lessee.'' In the NPRM, FTA stated that this amendment appeared to 
be consistent with common industry practice and Federal procurement 
streamlining measures.
    The NPRM pointed out that in reviewing the subject of capital 
leases, particularly vehicle leases, FTA had noted that maintenance and 
repair costs are often an integral component of standard commercial 
lease agreements and that use of capital assistance for such costs is 
expressly permitted under section 5307. Many commercial vehicle leases, 
for instance, state that the lessor will provide all maintenance, 
repairs, and replacement parts needed to keep the capital asset in good 
operating condition. These services are included in the overall lease 
cost, rather than being itemized as a separate charge. In such cases, 
it is not feasible for lessees to separate maintenance charges from the 
overall lease cost. The NPRM stated that requiring grantees to do so 
imposes an accounting burden that is inconsistent with Congress' 
recognition that leasing is often more cost effective and with its 
intention in section 308 to facilitate grantee operations.
    The NPRM moreover noted that since regular maintenance is necessary 
to ensure the availability and adequate functioning of a capital asset, 
FTA believes that it is an essential and inseparable element of the 
lease agreement. Congress has expressly recognized this relationship in 
allowing capital assistance to be used to acquire ``associated capital 
maintenance items'' under section 5307(b)(1), where such items would 
otherwise have to be funded under the operating assistance program. FTA 
therefore proposed to recognize maintenance charges as eligible capital 
costs under a commercial lease directly attributable to the lessee's 
use of the asset within the definition of section 639.17.
    The NPRM pointed out that this proposal is consistent with several 
recent initiatives, including the President's National Performance 
Review, Executive Order 12931 (Federal Procurement Reform), and the 
Federal Acquisition Streamlining Act of 1994 (FASA) (Pub. L. 103-355, 
108 Stat. 3243 (October 13, 1994)), which direct Federal agencies to 
remove administrative burdens in procurement processes. They encourage 
and facilitate the procurement of commercially available items by 
exempting agencies from unnecessarily burdensome government-unique 
certifications and accounting requirements that add costs and 
discourage companies from doing business with them. Section 8203 of 
FASA, for instance, requires that agencies use uniform, simplified 
contracts for the procurement of commercial items and that they revise 
all procurement procedures not required by law to eliminate impediments 
to use of such contracts. In the NPRM, FTA stated that requiring its 
recipients to account separately for maintenance costs under a 
commercial lease is

[[Page 25089]]

unnecessarily burdensome and makes such leases more costly and 
cumbersome to administer. Recognizing these costs explicitly in section 
639.17 should facilitate recipients' acquisition and maintenance of 
capital assets by allowing them to enter into standard commercial lease 
agreements more easily and at less cost.
    The NPRM stated that this proposal is consistent with FTA's 
recently issued Circular 4220.1C (``Third Party Contracting 
Requirements,'' October 1, 1995''), which reduces FTA requirements; 
provides grantees increased flexibility in soliciting, awarding, and 
administering contracts; reduces FTA's role in third party procurement 
activity; and allows recipients to use their own procurement practices 
that reflect State or local laws, provided that they conform to 
applicable Federal law. FTA noted that neither section 308 of the 
STURAA nor the accompanying Senate Report indicates that maintenance 
costs should not be treated as eligible capital expenses.
    In the NPRM, FTA sought comment on its proposal to recognize 
maintenance costs as eligible capital expenses under leasing 
agreements.

C. Comments on the NPRM

    FTA received ten comments in response to the NPRM: six from public 
transit agencies, two from State departments of transportation, one 
from a metropolitan planning organization, and one from an association 
representing local mass transit systems.
    All of the commenters strongly supported FTA's proposal to 
recognize maintenance costs as eligible capital expenses under leasing 
agreements. They pointed out that the proposed amendment would 
streamline the procurement process for transit managers and allow them 
to make contractual arrangements consistent with standard business 
practices. Two commenters opined that in the current climate of 
declining Federal operating assistance, the ability to charge 
maintenance costs as capital expenditures would somewhat ease the 
impact of these reductions. Overall, the commenters agreed that the 
amendment would be a positive step toward both increased flexibility in 
the use of grant funds and decreased administrative burdens on 
grantees.
    One commenter asked whether the costs of maintaining shared 
elements of a communications network could be eligible capital expenses 
under the amendment. The commenter noted that the capital items 
mentioned in the NPRM were for the exclusive use of the lessee, e.g., 
bus garages, computers, etc. Communications networks, on the other 
hand, include both shared elements and components that are used 
exclusively by the lessee. Both, however, are inseparable elements of 
the network, and maintenance of both is essential to its proper 
operation.
    As the NPRM indicated, the proposed amendment is intended to allow 
all maintenance services included in the overall lease cost of a 
capital item to be treated as an eligible capital expense. Therefore, 
any maintenance services charged to a grantee's capital lease would be 
eligible, whether they are for shared-use or exclusive-use segments of 
a system. Moreover, sections 639.25 and 639.27 of the regulation 
provide that estimated lease costs must be reasonable based on 
conditions applicable to the recipient, and that recipients are to use 
maintenance costs as a criterion in comparing leasing with purchasing 
or constructing an asset. Therefore, recipients may enter into leases 
of communications networks only if their share of the costs of 
maintaining common elements is reasonable, and if the cost of leasing, 
including the maintenance services, is more advantageous than purchase 
or construction. To the extent that these criteria are met, the cost of 
maintaining common elements of a communications or other network under 
a lease agreement would be an eligible capital expense.
    One commenter recommended extending the amendment to rural transit 
services using Federal funds under 49 U.S.C. 5311, since rural systems 
play an integral role in State transportation networks but lack 
adequate maintenance resources. As indicated above, under the OMB 
Circular A-87 requirements that were in effect at the time FTA's 
leasing regulation was initially promulgated, the portion of the lease 
cost representing imputed interest was ineligible for reimbursement 
unless expressly authorized by statute. Because section 308 of the 
STURAA applied specifically to the use of section 5307 funds, the 
leasing regulation covered only that program. However, in a recent 
revision of Circular A-87 (60 FR 26484, May 17, 1995), OMB changed its 
requirements to allow the reimbursement of interest payments under 
financing arrangements such as lease agreements. Therefore, specific 
statutory authorization is no longer required to permit capital 
reimbursement for the interest portion of any federally funded lease. 
Accordingly, 49 CFR Part 639 is now applicable to all FTA programs. -
    One commenter suggested that FTA allow all maintenance costs, 
including those that are not part of a lease agreement, to be treated 
as eligible capital expenses. The commenter stated that regular 
maintenance is necessary to ensure the availability and adequate 
functioning of all capital assets. Therefore, even in instances where 
maintenance expenses are paid separately by a recipient under either a 
lease or purchase arrangement, reimbursement at the capital rate should 
be allowed.
    The commenter's suggestion goes far beyond the scope of this 
proposed amendment, whose purpose is to facilitate recipient's entry 
into standard commercial leases that include maintenance and repair 
costs as integral components. Moreover, as noted above, neither section 
308 of the STURAA nor the accompanying Senate Report indicates that 
maintenance costs should not be treated as eligible capital expenses 
under a lease arrangement. FTA therefore believes that it has the 
statutory authority necessary to amend the regulation to allow the 
reimbursement as capital expenses of maintenance costs included in 
lease payments. However, FTA does not at the present time interpret its 
statutory authority to permit maintenance costs incurred outside of a 
lease agreement to be treated as capital expenses. In order to provide 
recipients with greater flexibility in their use of grant funds, FTA is 
considering seeking such authorization, and will amend its grant 
requirements accordingly at such time.
    Another commenter noted that under its Capital Cost of Contracting 
Policy (FTA Circular 7010.1, December 5, 1986), FTA must approve all 
leases for vanpool vehicles when section 5307 funds represent more than 
35 percent of the lease cost. The commenter proposed that this 
requirement be eliminated in the interest of streamlining the grant 
process and removing administrative burdens on acquisitions.
    First, the Capital Cost of Contracting Policy should not be 
confused with capital leasing under 49 CFR 639. Under the Capital Cost 
of Contracting Policy, a recipient contracts with a private carrier to 
provide mass transit service. The percentage of the service 
representing ``the capital consumed in the contract'' may be paid for 
with capital funds. Under the capital leasing rule, recipients may 
acquire tangible assets by lease, and all eligible lease costs may be 
reimbursed as capital expenses. Second, FTA has used industry studies 
and other objective data to determine which percentage of the service 
under a Capital Cost of Contracting arrangement

[[Page 25090]]

should be eligible for capital reimbursement. Until it receives 
information justifying another percentage, it will not amend its 
Capital Cost of Contracting Policy, and reserves the right to review 
all contracts in which reimbursement with section 5307 capital funds 
exceeds that percentage.
    Five commenters remarked that the language of section 639.17(b) as 
currently written contradicts the intent of the NPRM, since it could be 
construed to disqualify maintenance costs as eligible capital expenses. 
Section 639.17(b) now provides that ``the costs of materials, supplies 
and services provided under the terms of the lease may not be eligible 
for capital assistance, if they would not be eligible for capital 
assistance under a traditional purchase or construction grant.'' 
Maintenance costs have not been eligible for capital assistance under a 
traditional purchase or construction grant, and section 639.17(b) could 
be interpreted to preclude their reimbursement at the capital level. 
The commenters requested clarification of section 639.17(b), and one 
recommended revised language for that section providing such 
clarification.

D. FTA'S Final Action

    In keeping with the comments received, FTA will amend section 
639.17(a) to recognize maintenance costs as eligible capital expenses 
under a lease agreement. FTA believes that this action removes a 
significant impediment to capital leasing, and provides flexibility 
that can foster further innovations in the use of Federal funds.
    FTA is also revising section 639.17(b) to define eligibility for 
capital assistance in a manner that should not be construed to 
eliminate maintenance costs as an eligible capital expense.

II. Regulatory Impacts

A. -Executive Order 12866

    FTA has determined that this action is not significant under 
Executive Order 12866 or the regulatory policies and procedures of 
Department of Transportation regulatory policies and procedures. Since 
this final rule makes only a technical amendment to current regulatory 
language, it is anticipated that the economic impact of this rulemaking 
will be minimal; therefore, a full regulatory evaluation is not 
required.

B. -Regulatory Flexibility Act

    In accordance with 5 U.S.C. 603(a), as added by the Regulatory 
Flexibility Act, Pub. L. 96-354, FTA certifies that this rule will not 
have a significant impact on a substantial number of small entities 
within the meaning of the Act.

C. -Paperwork Reduction Act

    This action does not contain a collection of information 
requirement for purposes of the Paperwork Reduction Act of 1995.

D. -Executive Order 12612

    This action has been reviewed under Executive Order 12612 on 
Federalism and FTA has determined that it does not have implications 
for principles of federalism that warrant the preparation of a 
Federalism Assessment. If promulgated, this rule will not limit the 
policy making or administrative discretion of the States, nor will it 
impose additional costs or burdens on the States, nor will it affect 
the States' abilities to discharge the traditional governmental 
functions or otherwise affect any aspect of State sovereignty.

III. List of Subjects in 49 CFR Part 639

    Government contracts, Grant programs--Transportation, Mass 
transportation.

    Accordingly, for the reasons described in the Preamble of this 
document, FTA is proposing to amend Title 49, Code of Federal 
Regulations, Part 639 as follows:

PART 639--[AMENDED]

    1. The authority citation for Part 639 is revised to read as 
follows:

    Authority: 49 U.S.C. 5307; 49 CFR 1.51.

    2. Section 639.17 is revised to read as follows:

Sec. 639.17  Eligible lease costs.

    (a) All costs directly attributable to making a capital asset 
available to the lessee are eligible for capital assistance, including, 
but not limited to--
    (1) Finance charges, including interest;
    (2) Ancillary costs such as delivery and installation charges; and
    (3) Maintenance costs.
    (b) Any asset leased under this part must be eligible for capital 
assistance under a traditional purchase or construction grant.

    Issued on: May 13, 1996. ----------------
Gordon J. Linton,
Administrator.
[FR Doc. 96-12341 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-57-U

Complete official Federal Register PDF

FR Doc. 96-12217 Implementation of Section 273(d)(5) of the Communications Act of 1934, as Amended by the Telecommunications Act of 1996; Dispute Resolution Regarding Equipment Standards
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24897-24904]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12217]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 64

[GC Docket No. 96-42; FCC 96-205]

Implementation of Section 273(d)(5) of the Communications Act of 
1934, as Amended by the Telecommunications Act of 1996; Dispute 
Resolution Regarding Equipment Standards

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In order to implement a new statutory provision of the 
Telecommunications Act of 1996, the Commission adopts rules 
establishing a default dispute resolution process to be used when 
technical disputes arise between a non-accredited standards development 
organization (NASDO) and any party who funds the activities of the 
NASDO. Under the new rules, disputes will be resolved by a 
recommendation of a three-person expert panel, selected by both the 
disputing party and the NASDO, with the recommendation subject to 
disapproval by a vote of three-fourths of the other funding parties. As 
intended by Congress, this procedure ensures that disputes can be 
resolved in an open, non-discriminatory, and unbiased fashion within 30 
days, and it will be used only when all of the parties are unable to 
agree on a process for resolving their disputes. In addition, persons 
who willfully refer frivolous disputes will be subject to forfeiture 
pursuant to section 503(b) of the Communications Act.

EFFECTIVE DATE: June 17, 1996.

FOR FURTHER INFORMATION CONTACT: Sharon B. Kelley, Office of General 
Counsel, (202) 418-1720.

SUPPLEMENTARY INFORMATION:

    Adopted: May 7, 1996.
    Released: May 7, 1996.

I. Introduction

    1. The Telecommunications Act of 1996,1 amended the 
Communications Act by creating new sections 273 (d)(4) and (d)(5), 
which set forth procedures to be followed by non-accredited standards 
development organizations (NASDOs),2 such as Bellcore, when these 
organizations promulgate industry-wide 3 standards and generic 
requirements 4 for telecommunications equipment. Typically, as in 
the case of Bellcore, carriers fund these voluntary standard setting 
activities in order to assist the carriers in developing standards to 
guide their subsequent purchases of telecommunications equipment.
---------------------------------------------------------------------------

    \1\  Pub. L. 104-104, 110 Stat. 56 (1996).
    \2\  As defined in section 273(d)(8)(E), ``[t]he term 
`accredited standards development organization' means any entity 
composed of industry members which have been accredited by an 
institution vested with the responsibility for standards 
accreditation by the industry.'' 47 U.S.C. 273(d)(8)(E). Thus, for 
example, Bell Communications Research, Inc. (Bellcore) would not be 
an accredited standards development organization and is subject to 
the section 273 procedures. H.R. Cong. Rep. No. 230, 104th Cong., 2d 
Sess. 39 (1996).
    \3\  As defined in section 273(d)(8)(C), ``[t]he term `industry-
wide' means activities funded by or performed on behalf of local 
exchange carriers for use in providing wireline telephone exchange 
service whose combined total of deployed access lines in the United 
States constitutes at least 30 percent of all access lines deployed 
by telecommunications carriers in the United States as of the date 
of the enactment of the Telecommunications Act of 1996.'' 47 U.S.C. 
273(d)(8)(C).
    \4\  As defined in section 273(d)(8)(B), ``[t]he term `generic 
requirement' means a description of acceptable product attributes 
for use by local exchange carriers in establishing product 
specification for the purchase of telecommunications equipment, 
customer premises equipment, and software integral thereto.'' 47 
U.S.C. 273(d)(8)(B).
---------------------------------------------------------------------------

    2. In this Report and Order, the Commission adopts rules to 
implement new section 273(d)(5), which requires the Commission to 
prescribe a default dispute resolution process when technical disputes 
arise between the NASDO and any parties who fund the standards setting 
activities of the NASDO. In accordance with the statute, this 
``default'' procedure would be used only when all funding parties are 
unable to reach agreement as to a means for resolving technical 
disputes. As described below, we have decided that disputes governed by 
section 273(d)(5) should be resolved in accordance with the 
recommendation of a three-person

[[Page 24898]]

expert panel, selected by both the disputing party and the NASDO, with 
the recommendation subject to disapproval by a vote of three-fourths of 
the other funding parties.

II. Background

    3. As detailed in the Notice of Proposed Rulemaking (NPRM), 61 FR 
9966, March 12, 1996, the purpose of this proceeding is to establish 
dispute resolution procedures in accordance with new section 273(d)(5) 
of the Act.5 Section 273(d)(5) was enacted in conjunction with 
other procedures, set forth in section 273(d)(4), that impose new 
procedural requirements on voluntary standards setting activities by 
NASDOs, such as Bellcore, which is owned by the regional Bell operating 
companies (RBOCs). As indicated above, Bellcore sets voluntary 
standards to assist in the carriers' purchase of telecommunications 
equipment. The statutory procedures generally require more openness and 
fairness in the standards setting process, particularly in light of the 
potential that, under other provisions of the Telecommunications Act, 
the BOCs may be permitted to engage in the manufacture of 
telecommunications equipment.6
---------------------------------------------------------------------------

    \5\  61 FR 9966, at para. 2.
    \6\ 47 U.S.C. 273 (d)(4), (e).
---------------------------------------------------------------------------

    4. To foster more open procedures, under new section 273(d)(4), a 
NASDO is required to issue a public invitation to interested industry 
parties to fund and participate in setting any industry-wide standards 
or generic requirements. Further, such funding and participation must 
be allowed ``on a reasonable and nondiscriminatory basis, administered 
in such a manner as not to unreasonably exclude any interested industry 
party.'' 7 In the event of disputes on technical issues, the 
NASDOs and funding parties must also attempt to develop a dispute 
resolution process.8 Section 273(d)(5) requires the Commission to 
prescribe within 90 days of the section's enactment a dispute 
resolution process to be used if the parties cannot agree to a dispute 
resolution process.9
---------------------------------------------------------------------------

    \7\  Id.
    \8\  Id.
    \9\  47 U.S.C. 273(d)(5).
---------------------------------------------------------------------------

    5. Specifically, section 273(d)(5) provides:

    [W]ithin 90 days after the date of enactment of the 
Telecommunications Act of 1996, the Commission shall prescribe a 
dispute resolution process to be utilized in the event that a 
dispute resolution process is not agreed upon by all the parties 
when establishing and publishing any industry-wide standard or 
industry-wide generic requirement for telecommunications equipment 
or customer premises equipment pursuant to paragraph (4)(A)(v). The 
Commission shall not establish itself as a party to the dispute 
resolution process. Such dispute resolution process shall permit any 
funding party to resolve a dispute with the entity conducting the 
activity that significantly affects such funding party's interests, 
in an open, nondiscriminatory, and unbiased fashion, within 30 days 
after the filing of such dispute. Such disputes may be filed within 
15 days after the date the funding party receives a response to its 
comments from the entity conducting the activity. The Commission 
shall establish penalties to be assessed for delays caused by 
referral of frivolous disputes to the dispute resolution process.

    Thus, as described in new section 273(d)(5), the Commission's 
dispute resolution process must be conducted in an open, non-
discriminatory and unbiased fashion and so that disputes are resolved 
within 30 days of the filing of the dispute. The process is triggered 
only if all funding parties fail to agree to a process for resolving 
technical issues. Section 273(d)(5) also requires the Commission to 
establish penalties to be assessed for delays caused by referral of 
frivolous disputes to the dispute resolution process.10
---------------------------------------------------------------------------

    \10\ Id.
---------------------------------------------------------------------------

    6. In the NPRM, we invited members of the public to comment on our 
proposal to require binding arbitration as the dispute resolution 
process.11 We asked commenters to address the methods for 
selecting an arbitrator or neutral and whether the Commission should 
make its employees available to serve in that capacity.12 In 
addition, we invited commenters to submit alternative proposals to 
implement this statutory provision.13 Finally, the NPRM solicited 
proposals or recommendations concerning the types of penalties that 
should be assessed for delays caused by the referral of frivolous 
disputes to the dispute resolution process.14
---------------------------------------------------------------------------

    \11\  61 FR at 9966-9967, para.3-para.6.
    \12\ Id. at 9967, para.6.
    \13\ Id. at 9966, para.2.
    \14\ Id. at 9967, para.8.
---------------------------------------------------------------------------

    7. We received comments from the following entities: (1) Bell 
Atlantic; (2) Bellcore; (3) BellSouth Corporation and BellSouth 
Communications, Inc. (BellSouth); (4) Corning Incorporated (Corning); 
(5) Telecommunications Industry Association (TIA); and (6) U.S. West, 
Inc. (U.S. West). Reply comments were received from: (1) Ameritech; (2) 
American National Standards Institute (ANSI); (3) Alliance for 
Telecommunications Industry Solutions (ATIS); (4) Bellcore; (5) 
BellSouth; (6) Corning; (7) Northern Telecom, Inc. (Nortel); (8) 
Pacific Bell; (9) SBC Communications, Inc. (SBC); (10) SpecTran Corp; 
and (11) TIA. The Commission also received late-filed reply comments 
from MCI and ex parte submissions from Bellcore, Corning and Nortel.

III. Discussion

A. Commission's Binding Arbitration Proposal

    8. In the NPRM, we sought comment on a binding arbitration as a 
method that could be used to satisfy the statutory dispute resolution 
default provision requirement.15 We observed that this approach 
appeared consistent with the stated purpose of section 273(d)(5), set 
forth in the Conference Report, to ``enable all interested parties to 
influence the final resolution of the dispute without significantly 
impairing the efficiency, timeliness and technical quality of the 
activity.'' 16 In addition, the NPRM concluded that binding 
arbitration seemed to be the only feasible dispute resolution process 
in view of the 30 day deadline for completion of the process.17
---------------------------------------------------------------------------

    \15\  See note 10, supra.
    \16\  Id. at 9967, para.3.
    \17\  Id. at para.4.
---------------------------------------------------------------------------

    9. For a variety of reasons, the commenting parties overwhelmingly 
opposed the binding arbitration proposal set forth in the NPRM.18 
The parties generally agreed with Corning's view in its initial 
comments that binding arbitration would not adequately take into 
account the broad impact of standards-related disputes on industry 
participants other than the NASDO and the participating party who 
invokes the dispute resolution process.19 The commenters also 
indicated it would be difficult to identify a neutral arbitrator to 
resolve these highly technical issues and to arbitrate these issues 
within the 30-day time frame required by the law. TIA also stated that 
the use of arbitrators would lead to ``compromise'' solutions that were 
inappropriate in view of the technical nature of these disputes.20 
Others, including Bellcore and U.S. West, believed that imposing 
binding arbitration, without the consent of the parties, was 
inconsistent with the

[[Page 24899]]

voluntary nature of the underlying standards process.21
---------------------------------------------------------------------------

    \18\ See comments of Corning at ii, 6-7; comments of 
Telecommunications Industry Association (TIA) at 2-3; comments of 
Bellcore at i, 16-18; comments of Bell Atlantic at 2; comments of 
U.S. West at 2-3; comments of BellSouth at 2-3; comments of Nortel 
at 4; reply comments of Pacific Bell at 1; reply comments of 
Alliance for Telecommunications Industry Solutions (ATIS) at 2; 
reply comments of BellSouth at 1; reply comments of SBC at 2; reply 
comments of Corning at 2; reply comments of Bellcore at 1. But see 
late-filed comments of MCI at 1.
    \19\  Comments of Corning at 6.
    \20\  Comments of TIA at 2-3.
    \21\  Comments of Bellcore at i, 16; comments of U.S. West at 3.
---------------------------------------------------------------------------

    10. For example, as U.S. West observed, nothing in the 
Telecommunications Act alters the fact that standards setting 
activities by both accredited and non-accredited entities, continue to 
remain voluntary, depending almost entirely on the good faith of the 
individual funding entities for their ultimate success or 
failure.22 Bellcore further observed in its comments that generic 
requirements complement standards which by their very nature are not 
binding on anyone, vendors or purchasers.23 While noting that 
generic requirements provide valuable technical information to exchange 
carriers, Bellcore underscored the fact that such requirements ``only 
have meaning if exchange carriers choose to use them and if suppliers 
choose to conform their products to them.'' 24
---------------------------------------------------------------------------

    \22\  Comments of U.S. West at 2.
    \23\  Comments of Bellcore at 17.
    \24\  Id. at 5 and 17.
---------------------------------------------------------------------------

    11. In late-filed comments, one commenter, MCI, supported the 
Commission's binding arbitration proposal, finding it preferable to 
either of two alternative proposals, discussed more fully below, that 
had been submitted by Corning (Corning I) and Bellcore.25 As 
discussed below, however, we conclude that a second proposal submitted 
by Corning (Corning II) resolves many of the defects that had been 
evident in both the Corning I and Bellcore alternatives. This proposal 
also appears to be superior in some respects to the Commission's 
proposal to use binding arbitration. Therefore, as explained below, we 
have decided not to use binding arbitration as the default dispute 
mechanism under section 273(d)(5). We will instead use the alternative 
procedure proposed by Corning, the Corning II proposal, with some 
modifications.
---------------------------------------------------------------------------

    \25\  Late-filed reply comments of MCI at 1-3.
---------------------------------------------------------------------------

B. Commenters' Alternative Proposals

    12. In addition to proposing the use of binding arbitration, the 
NPRM invited commenters to submit alternative proposals. We noted that 
other methods of alternative dispute resolution included, for example, 
mediation, neutral evaluation, and hybrids of these methods.26 In 
response, two very different alternative proposals were initially 
submitted, one by Corning, a manufacturer of fiber optics equipment, 
and another by Bellcore.
---------------------------------------------------------------------------

    \26\ 61 FR at 9967,para.5.
---------------------------------------------------------------------------

    13. The Corning I proposal involved referral of the technical 
dispute to an accredited standards development organization (SDO). Many 
parties commented on this proposal. Although comment was somewhat 
divided, much of the comment was sharply critical of the proposal. For 
example, Bellcore and many of the BOCs believed that the Corning I 
proposal was inconsistent with congressional intent because it excluded 
the funding parties from participating in resolution of the technical 
dispute, even though the funders played a major role in funding the 
NASDO's work and would be most affected by any dispute 
resolution.27 They also pointed out that there was no assurance 
that the SDOs had procedures in place that would enable resolution of 
the dispute within the 30 day statutory time period. They further 
believed that the process would often lead to no resolution at all of 
key technical issues, thereby frustrating the essential purpose of 
NASDOs to create standards that lead to efficiencies and 
interoperability within the communications industry. Similarly, in its 
late filed comments, MCI opposed the Corning I proposal because it was 
unlikely to result in a binding decision.28
---------------------------------------------------------------------------

    \27\ Comments of Bellcore at 3-4, 7; comments of BellSouth at 4.
    \28\ Late-filed reply comments of MCI at 3.
---------------------------------------------------------------------------

    14. The two organizations representing relevant SDOs who commented 
were divided on the Corning I proposal. One of these, TIA, approved the 
proposal, but the other organization, ATIS, strongly criticized the 
proposal as promoting ``forum shopping.'' 29 ATIS further stated 
that its Committee T1, which develops standards for network interfaces, 
could not accommodate the statutorily mandated 30 day resolution 
period.30 Similarly, the two manufacturing companies who commented 
were divided, with one commenter, SpecTran Corp., supporting the 
Corning I proposal, and the other, Nortel, strongly disagreeing with it 
as inviting forum shopping and abuse.31
---------------------------------------------------------------------------

    \29\ Comments of TIA at 2-3; reply comments of ATIS at 4-5.
    \30\ Reply comments of ATIS at 4.
    \31\ Comments of Nortel at 2-3; comments of SpecTran at 1.
---------------------------------------------------------------------------

    15. Bellcore's original proposal is discussed below, in the context 
of modifications to it suggested by Corning. In response to the 
Bellcore proposal, Corning submitted a second proposal, which it 
characterized as a compromise proposal, and which incorporated many 
features of the dispute resolution proposal that had been submitted by 
Bellcore.32 For the reasons discussed below, we conclude that 
Corning's latest proposal, which we shall refer to as the Corning II 
proposal, is generally consistent with the dispute resolution procedure 
envisioned by Congress in section 273(d)(5). In addition, we believe 
the Corning II proposal avoids many of the practical and other problems 
associated with both the Corning I and Bellcore proposals. We have 
therefore decided to adopt, with some modifications, the Corning II 
proposal, which is described and discussed below.
---------------------------------------------------------------------------

    \32\ Ex Parte submission of Corning at 1.
---------------------------------------------------------------------------

C. The Corning II Proposal

    16. As indicated above, the dispute resolution rule we adopt in 
this proceeding is based on a proposal suggested by Bellcore that has 
been modified by Corning. The Corning II proposal retains many 
significant features of the original Bellcore proposal that were 
praised by those commenters who preferred Bellcore's proposal over 
Corning I. Most significantly, unlike the Corning I plan, the Corning 
II variation does not require that technical disputes be resolved in 
forums other than the NASDO. Bellcore's original plan, and the Corning 
II variation adopted here, permit the funding parties to resolve these 
disputes internally. To that extent, we believe that the Corning II 
proposal is consistent with Congress's intent that the process we 
select should enable all interested parties to influence the final 
resolution of the dispute.
    17. Corning, however, suggests several changes to Bellcore's 
proposal that we believe will better enable the resolution of disputes 
in an ``open, non-discriminatory and unbiased fashion,'' consistent 
with section 273(d)(5). For example, some commenters, primarily Corning 
and MCI, expressed concern that the Bellcore proposal afforded too much 
power to the BOCs and Bellcore in controlling resolution of any 
disputes.33 The Corning II variation makes five major changes to 
Bellcore's plan. Most of those changes, we believe, better promote the 
statutory objectives of fair, unbiased decisionmaking. In response to 
ex parte comments from Bellcore, however, we have modified some aspects 
of the Corning II proposal to develop the dispute resolution default 
process we now adopt.34
---------------------------------------------------------------------------

    \33\ Reply comments of Corning at 14-16; late-filed comments of 
MCI at 2.
    \34\ See generally, ex parte submission of Bellcore.
---------------------------------------------------------------------------

    18. Tri-Partite Panel. The Corning II proposal permits the 
disputant to select only one dispute resolution approach. Under the 
approach proposed by

[[Page 24900]]

Bellcore, the funding parties could, by majority vote, choose among 
several ``default'' options for resolving disputes. These options 
included ``escalating'' the dispute to higher decisionmaking bodies 
within the NASDO; resolution of the dispute by a majority of those 
funding the standards development effort; or, resolution of the dispute 
based on the recommendation of a three-party expert advisory panel. The 
Corning II variation, in contrast, retains only the option of using a 
three-party expert panel, with one panelist selected by the disputing 
party, another selected by the NASDO, and a third panelist selected 
jointly by the panelists representing the NASDO and disputing party. 
Persons who participated in the generic requirements or standards 
development process, including the disputing party and the NASDO, are 
eligible to serve on the panel. As with Bellcore's proposal, this 
three-member panel, by majority vote, would make a written 
recommendation concerning the dispute.
    19. Several parties, including MCI, criticized some of the dispute 
resolution options permitted under Bellcore's proposal, particularly 
the escalation and majority vote options, because these options 
appeared to give the BOCs undue power in resolving disputes.35 We 
agree that the Corning II proposal, which retains only the option of 
using a tri-partite expert panel, is superior in terms of avoiding the 
potential that the BOCs or Bellcore would unduly dominate 
decisionmaking.
---------------------------------------------------------------------------

    \35\ Late-filed reply comments of MCI at 2.
---------------------------------------------------------------------------

    20. In commenting on the Corning II proposal, however, Bellcore 
continues to believe that, while a tri-partite panel should be 
available as an option and as the fall-back in the event of a deadlock, 
the funding parties should also be able to use escalation and other 
procedures.36 We recognize that this variation on Bellcore's plan 
removes some of the flexibility that several commenters had applauded 
in commenting on Bellcore's proposal. We nevertheless conclude that the 
advantage of the Corning II proposal in terms of avoiding possible 
unfairness far outweighs any concern about loss of flexibility.
---------------------------------------------------------------------------

    \36\ April 18, 1996, ex parte letter from Bellcore at 1.
---------------------------------------------------------------------------

    21. Further, as reflected in Corning's comments and in the Corning 
II proposed rule, disputing parties and Bellcore are also permitted to 
agree to a means of dispute resolution other than the default procedure 
provided for in section 273(d)(5). The statutory dispute provision 
clearly is a remedial measure, which is designed to protect the 
interests of disputing parties. Hence, the statute merely provides that 
a disputing party has the option of using the section 273(d)(5) default 
procedure. Section 273(d)(4) thus states that a disputing party ``may 
utilize the dispute resolution procedures established pursuant to 
[section 273(d)(5)] * * *'' (Emphasis added.) 37 The default 
procedure therefore is not mandatory if the disputing party and 
Bellcore both agree to select another approach. Accordingly, we believe 
that parties will not be deprived of desirable flexibility even though 
we have decided to limit the default dispute resolution procedure to a 
single approach. We emphasize, as do many of the commenters, that 
funding parties should adopt their own dispute resolution procedures 
whenever possible.
---------------------------------------------------------------------------

    \37\ 47 U.S.C. 273(d)(4).
---------------------------------------------------------------------------

    22. Override Provision. A second major change to Bellcore's 
proposal involves the Bellcore provision that would have allowed a 
majority of the funding parties to reject the recommendation of the 
tri-partite expert panel. We are sympathetic to the argument that any 
dispute resolution procedure should permit the funding parties to 
participate in dispute resolution by having some final say in how the 
dispute is resolved. Nevertheless, we agree with Corning and other 
parties, such as MCI and Nortel, who believe that allowing 
``overrides'' by a simple majority of funders may afford too much power 
to particular blocks of funding parties, including the regional BOCs 
who currently own Bellcore.38
---------------------------------------------------------------------------

    \38\ Ex parte submission of Corning at 1, note 1; reply comments 
of Nortel at 7; late-filed comments of MCI at 2.
---------------------------------------------------------------------------

    23. To resolve this concern, the Corning II proposal would 
generally permit funding parties to override a panel recommendation by 
a vote of three-fourths of the funding parties, excluding the party who 
invoked the dispute resolution process and the NASDO. Each funding 
party would have one vote. However, when a funding party has an 
indirect equity interest in the NASDO or any ownership interest in 
intellectual property that would be advantaged by the final resolution 
of the dispute, a decision to reject the recommendation must be by a 
unanimous vote of the funding parties, again excluding the party which 
invoked the dispute resolution process and the NASDO.
    24. Presumably, due to the regional BOCs' ownership interests in 
Bellcore, the unanimous vote requirement would apply to Bellcore. 
Bellcore is concerned that requiring a unanimous vote would permit an 
affiliate of a disputing party, or another serving as its proxy, to 
veto the decision of all carriers. Bellcore also believes that Nortel 
has proposed a reasonable compromise in suggesting that a vote of two-
thirds of the funding parties voting be required to reject a panel 
recommendation.39
---------------------------------------------------------------------------

    \39\ Ex parte submission of Bellcore at 1.
---------------------------------------------------------------------------

    25. In contrast to the original Bellcore proposal, we think a more 
stringent ``override'' proposal offers better protection against biased 
decisionmaking. We agree with Bellcore that requiring a unanimous vote 
of funders may be too onerous. However, we think a fair compromise is 
to require a vote by three-fourths of the voting funders both to reject 
a panel's recommendation and to substitute another resolution of the 
dispute. The three-fourths proposal avoids Bellcore's concern that a 
unanimous vote requirement affords the disputing party the power to 
veto the decision of all the carriers. At the same time, the three-
fourths requirement also decreases Corning's fear that a simple 
majority--or possibly even a two-thirds vote--affords too much control 
to the RBOC's.
    26. Standard for Recommended Decision. The Corning II proposal has 
recommended a third change that improves upon the original Bellcore 
proposal. Bellcore proposed that the appropriate issue to be resolved 
by the recommending panel was ``whether there is a sound technical 
basis for the position of the [NASDO] * * *.'' That standard, we 
believe, unfairly disadvantages the disputant by placing upon it an 
undue burden to demonstrate that the NASDO's approach is not based on a 
sound technical basis, instead of focusing more on the relative merits 
of the two approaches. The Corning II proposal, in contrast, focuses 
more on the relative merits of the technical arguments by requiring the 
panel to choose ``the option that provides the most technically sound 
solution that is commercially viable* * *.'' 40 We recognize that 
the statutory 30-day deadline will create difficulties in resolving the 
technical merits. Bellcore, for example, objects to the standard 
proposed by Corning, believing that the panel will be unable to decide 
within the statutory timeline what is ``the most technically sound 
solution.'' 41 The statute, however, places no limitation on the 
types of technical disputes that may be raised by funding parties. We 
therefore do not believe that the standard for dispute resolution can 
be

[[Page 24901]]

limited to whether the NASDO's proposal can be reasonably supported by 
technical evidence, as Bellcore proposes.
---------------------------------------------------------------------------

    \40\ Ex parte submission of Corning at 3.
    \41\ Ex parte submission of Bellcore at 3.
---------------------------------------------------------------------------

    27. For the same reason, we do not agree with Bellcore's view that 
the panel should be precluded from deciding ``that a particular issue 
is not ready for a decision because there is insufficient technical 
evidence to support the soundness of any one proposal over any other 
proposal.'' 42 Moreover, such a recommendation would not 
necessarily lead to the absence of a decision on a standard, as 
Bellcore claims. As indicated above, even if that were the panel's 
recommendation, the funders would still be able to select a technical 
standard by a two-third's vote.
---------------------------------------------------------------------------

    \42\ Id.
---------------------------------------------------------------------------

    28. Finally, Bellcore believes that ``commercial viability'' should 
not be part of the decisional basis, claiming that such a basis may go 
beyond the technical matters contemplated by section 273(a)(5).43 
Bellcore also believes such a standard may involve economic analysis 
and competitively sensitive business information, data that may be 
difficult for the panel to obtain.44
---------------------------------------------------------------------------

    \43\ Id. at 4.
    \44\ Id.
---------------------------------------------------------------------------

    29. We think that in resolving technical disputes it may well be 
appropriate to consider the complexity and practical feasibility of 
particular technical solutions in some circumstances. However, we also 
believe that the decisional standard proposed by Corning places undue 
emphasis on commercial and cost-related issues not the technical 
issues.45 We shall therefore modify the standard to state that a 
panel is not precluded from taking into account the complexity of 
technical approaches and other practical considerations in deciding 
which option is most technically sound.
---------------------------------------------------------------------------

    \45\ Ex parte submission of Nortel.
---------------------------------------------------------------------------

    30. Disclosure Requirements. The Corning II proposal also includes 
a new disclosure provision requiring that any party in interest 
submitting information for consideration by the panel must disclose its 
ownership of intellectual property that may be advantaged or 
disadvantaged by the final decision, and that the panel must consider 
this information in making its recommendation.46 This provision 
seems designed to lead to decisionmaking that is more fully informed 
about the possible biases of commenting parties and to result in 
technical standards that may be met by a broader spectrum of equipment 
manufacturers. Bellcore objects to this proposal. It states that ANSI-
accredited standards development organizations encourage early 
disclosure of intellectual property rights, but do not require it. 
Bellcore also believes that requiring disclosure of intellectual 
property rights would inhibit funding and participation in the 
activities of the NASDO.
---------------------------------------------------------------------------

    \46\ Ex parte submission of Corning at 2.
---------------------------------------------------------------------------

    31. We believe the disclosure provisions suggested by Corning are 
generally consistent with requirements of ANSI-accredited standards 
organizations. The TIA Engineering Manual, for example, has a policy of 
encouraging early disclosure of essential patents, and requires its 
Committees to ask at the beginning of each meeting where a potential 
standard is being considered whether there is knowledge of essential 
patents, the use of which may be essential to the standard being 
developed. Moreover, the fact that the question was asked will be 
recorded in the meeting report, along with any affirmative responses. 
Similarly, ANSI's patent policy requires that, prior to approval of any 
proposed standard, any licenses will be made available to applicants 
without compensation or ``under reasonable terms and conditions.'' 
47
---------------------------------------------------------------------------

    \47\ Reply comments of ANSI at 4.
---------------------------------------------------------------------------

    32. We think that the Corning II proposal that parties submitting 
information to the panel disclose similar information is generally 
consistent with these ANSI requirements. However, we shall modify the 
Corning II proposal somewhat to make it more consistent with the rule 
followed by the TIA Engineering Manual. Specifically, the rule will 
require that the panel ask commenting parties whether there is 
knowledge of patents, the use of which may be essential to the standard 
or generic requirement being considered. In addition, the fact that the 
question was asked along with any affirmative responses may be recorded 
and considered in the panel's recommendation. We do not believe that 
such a requirement will affect funding and participation in NASDOs. The 
requirement applies only to those who submit comments to the expert 
panel, and moreover, such requirements have apparently not discouraged 
participation in ANSI accredited standards development organizations. 
In addition, Nortel points out that there appears to be no precedent 
for ANSI-accredited bodies to link voting rights to intellectual 
property interests. We see no reason, therefore, to disqualify the 
holders of such interests from voting on the recommendations of the 
tri-partite panel.
    33. Costs of Dispute Resolution. Finally, whereas the Bellcore 
proposal had required the disputing party to bear the entire cost of 
the default dispute resolution procedure, the Corning-Bellcore 
variation requires that the cost of resolving disputes be absorbed by 
all of the funding parties. This modification, in our view, better 
ensures that disputants are not unduly discouraged from raising 
technical issues. In addition, all of the funding parties should 
benefit from the fairer and more open resolution of these technical 
questions. It is therefore fitting that they should all share in the 
cost.
    34. In summary, we believe that the statutory objectives can be 
best fulfilled by the new Corning II approach, with some modifications. 
This approach incorporates the best aspects of the Bellcore proposal 
and modifies them to achieve the goal of unbiased decisionmaking. The 
proposal to utilize a tri-partite expert panel to make recommendations 
resolving disputes, with a provision that allows the funding parties to 
override the recommendation, also ensures that, as Congress intended, 
all of the funding parties are able to participate in influencing the 
final outcome. The approach is set out in detail in the Appendix of the 
Report and Order.

D. Funding Parties

    35. The commenters were divided over the meaning of the term 
``funding party.'' Corning and TIA take the position that Congress 
intended to allow any interested party access to the alternative 
dispute resolution process.48 While acknowledging that sections 
273(d)(4) and (d)(5) refer to ``funding parties,'' Corning argues that 
the clear intent of the statute was only to provide a basis for 
determining the legitimacy of parties interested in participating in 
NASDO processes.49
---------------------------------------------------------------------------

    \48\  Reply comments of TIA at 2.
    \49\  Reply comments of Corning at 12.
---------------------------------------------------------------------------

    36. To put this in perspective, Corning explained that the direct 
costs of Bellcore's generic requirements were traditionally borne by 
the affected carriers, with vendors generally making some form of ``in-
kind'' contributions, i.e., technical presentation or technical 
support.50 Corning also argues that, under the new statute, 
funding levels may not be used as an exclusionary device. In this same 
vein, TIA maintains that a funding party should not be defined by the 
amount that the party contributed to funding the standards

[[Page 24902]]

setting activities but rather, by ``any amount that demonstrates the 
party shows a responsible interest in the proceeding.'' 51 TIA 
suggests that parties could meet this requirement by posting a 
performance bond.52
---------------------------------------------------------------------------

    \50\ Id.
    \51\ Comments of TIA at 3-4.
    \52\ Id.
---------------------------------------------------------------------------

    37. In response, Bellcore and the RBOC's state that, since there 
was no congressional debate on section 273(d), the Commission must look 
to the plain language of the statute. As noted by Bellcore, section 
273(d)(4)(A)(v) provides that ``a funding party may utilize the dispute 
resolution procedures established pursuant to paragraph (5)'' and 
section 273(d)(5) states that ``[s]uch dispute resolution process shall 
permit any funding party to resolve a dispute .''* * * 53 Bellcore 
thus opposes TIA's performance bond proposal, concluding that if a 
vague genuine interest and not actual funding is to be the standard, 
this could open the door to a variety of ill-motivated though colorable 
``technical'' disputes that the section 273(d)(5) process should not 
promote.54
---------------------------------------------------------------------------

    \53\  Reply comments of Bellcore at 10-11.
    \54\  Id. at 7-9.
---------------------------------------------------------------------------

    38. We conclude that the language of the statute clearly supports 
that only a funding party is permitted to invoke the dispute resolution 
process contained in Section 273(d). The statute expressly provides 
that a party may become a funder after a public invitation is issued to 
interested industry parties ``to fund and to participate'' and that 
only a ``funding party'' may invoke dispute resolution. Moreover, 
consistent with the clear language of the statute, we think that only 
parties who are willing to provide actual funding to support the 
standards setting process may utilize the statutory dispute resolution 
process. We thus do not agree with TIA's suggestion that merely by 
posting a performance bond an entity may become a funding party, nor 
with Corning that ``in-kind'' contributions are necessarily adequate.
    39. At the same time, section 273(d)(4)(A)(2) of the statute 
expressly requires that funding and participation be allowed on ``a 
reasonable and nondiscriminatory basis, administered in such a manner 
as not to unreasonably exclude any interested industry party.'' We 
therefore believe that the statute requires that NASDOs must make 
reasonable and nondiscriminatory efforts to ensure that the funding 
requirement is not manipulated so as to unreasonably exclude outside 
participants.

E. Referral of Frivolous Disputes

    40. Section 273(d)(5) directs the Commission to establish penalties 
for delays caused by the referral of frivolous disputes to the 
Commission's default process. Both Bellcore and Corning endorsed the 
proposal made in our NPRM to rely on section 1.52 of the Commission's 
rules to define the term ``frivolous dispute.'' Section 1.52 requires 
that any document filed with the Commission be signed by the party or 
attorney and that such signature certifies that the person has read the 
document, that there is good ground to support it, and thus it is not 
filed for the purpose of delay.
    41. Other commenters either offered alternate suggestions or raised 
concerns with our proposal. For example, we were referred to the 
``sham'' exception to antitrust immunity enjoyed by parties under the 
Noerr-Pennington doctrine.55 Another party referred us to the 
standards used by federal courts to determine whether complaints are 
filed in good faith.56 Another commenter questioned whether we 
need to assess the motive of the disputant if the claim has no 
legitimate basis.57
---------------------------------------------------------------------------

    \55\  Comments of Corning at 13.
    \56\  See Rule 11 of the Federal Rules of Civil Procedure; 
comments of Bellcore at 23.
    \57\  Comments of Corning at 13.
---------------------------------------------------------------------------

    42. We recognize that any attempt to give meaning to the term 
``frivolous'' is inherently difficult, as reflected by attempts the 
courts have made to grapple with similar problems. We have decided, 
however, to be guided by our existing rule which appears to be as 
workable as any of the alternatives suggested. Thus, the party 
responsible for referring a dispute to our process does so with the 
understanding that the dispute, as defined in section 1.52, is not 
frivolous, is supported by good ground, and is not filed for the 
purpose of delay.
    43. In seeking comment on the penalties that should be assessed 
against delaying parties, the NPRM asked whether the Commission should 
rely on its forfeiture authority contained in section 503(b) of the 
Communications Act, or whether other penalties should be imposed ``such 
as barring the party from further participation in the standards 
development processes or the imposition of costs on the complainant if 
its complaint is found to be frivolous.'' 58 The NPRM also sought 
comment on whether procedural protections were necessary to protect the 
party subject to the dispute.59 In this connection, commenters 
were asked to consider whether there should be a citation and 
subsequent misconduct before the assessment of such forfeitures.60
---------------------------------------------------------------------------

    \58\  61 FR 9967 at para.8.
    \59\  Id.
    \60\  Id.
---------------------------------------------------------------------------

    44. U.S. West argued that ``punitive actions being taken to prevent 
frivolous invocation of the mediation process'' were unnecessary and 
emphasized that the Commission could later adopt rules if 
necessary.61 Bellcore argued against the imposition of penalties 
by the tri-partite panel, emphasizing that the panel's role is a 
``technical one, not a legalistic penalty-imposing one.'' 62 In 
addition, Bellcore proposes that the remedy of barring further 
participation should ``be reserved to address only a pattern of abuse, 
and not an isolated act'' 63 and Corning maintains that it ``could 
substantially impair the subject company's ability to compete in the 
manufacture and marketing of products which are the subject of the 
relevant NASDO activities'' and is ``neither required not authorized by 
the statute.'' 64 Finally, Bellcore advocates that, in cases where 
the Commission determines that a frivolous dispute was referred to the 
dispute resolution process, in addition to imposing forfeitures as 
proposed in the NPRM, we should require ``the party raising a frivolous 
claim to bear all costs of dispute resolution, and compensating the 
funding parties for delay.'' 65
---------------------------------------------------------------------------

    \61\ Comments of U.S. West at 8.
    \62\ Comments of Bellcore at 23.
    \63\ Id. at 23-24.
    \64\  Comments of Bellcore at 24; comments of Corning at 15.
    \65\  Comments of Bellcore at 23.
---------------------------------------------------------------------------

    45. We have concluded that, in light of the above comments, at this 
time, violations for filing frivolous disputes can be handled best 
pursuant to our forfeiture authority under section 503(b) of the 
Communications Act. While we clearly expect referrals of frivolous 
disputes to be rare occurrences, we will not hesitate to revisit this 
issue, if necessary, to determine whether more severe penalties should 
be imposed.

F. Sunset Provision

    46. In its initial comments, Corning urged the Commission to make 
clear that an applicant seeking removal of the requirements of sections 
273(d)(3) or 273(d)(4) provide appropriate documentary evidence to 
support such a request.66 Bellcore, in response, believes 
Corning's request is premature.67 We agree that adoption of 
evidentiary requirements at this time appears premature. The statute 
prescribes a public comment period on

[[Page 24903]]

any such application. We believe we will be in a better position to 
evaluate the adequacy of the support for any particular application 
after we have received comment on it.
---------------------------------------------------------------------------

    \66\  Comments of Corning at 16.
    \67\  Comments of Bellcore at 24.
---------------------------------------------------------------------------

IV. Procedural Matters

    47. Final Regulatory Flexibility Analysis. Pursuant to the 
Regulatory Flexibility Act of 1980, the Commission's final analysis is 
as follows:

Reason for Action

    The Telecommunications Act of 1996 permits a Bell Operating 
Company, through a separate subsidiary, to engage in the manufacture of 
telecommunications equipment and customer premises equipment after the 
Commission authorizes the company to provide in-region interLATA 
services. As one of the safeguards for the manufacturing process, the 
Telecommunications Act of 1996 amended the Communications Act by 
creating a new section 273, which sets forth procedures for a ``non-
accredited standards development organization,'' such as Bell 
Communications Research, Inc., to set industry standards for 
manufacturing such equipment. The statutory procedures allow outside 
parties to fund and participate in setting the organization's standards 
and require the organization and the funding parties to attempt to 
develop a process for resolving any technical disputes. Section 
273(d)(5) requires the Commission ``to prescribe a dispute resolution 
process'' to be used in the event that all parties cannot agree to a 
mutually satisfactory dispute resolution process. 47 U.S.C. 273(d)(5). 
The purpose of this Report and Order is to implement Congress's goal by 
prescribing a dispute resolution process which ``enable[s] all 
interested parties to influence the final resolution of the dispute 
without significantly impairing the efficiency, timeliness and 
technical quality of the activity.'' H.R. Conf. Rep. No. 230, 104th 
Cong., 2d Sess. 39 (1996).

Summary of the Issues Raised by the Public Comments in Response to the 
Initial Regulatory Flexibility Analysis

    There were no comments submitted in response to the Initial 
Regulatory Flexibility Analysis.

Significant Alternatives Considered

    The Notice of Proposed Rulemaking in this proceeding offered a 
binding arbitration proposal and solicited alternative proposals from 
the commenters. The commenters overwhelmingly opposed the binding 
arbitration proposal. Alternative proposals were also submitted by the 
commenters. The regulation selected, a tri-partite expert panel, 
fulfills the specific statutory parameters of section 273--that the 
process shall permit resolution ``in an open, non-discriminatory and 
unbiased fashion within 30 days after the filing of such dispute'' and 
that the process will ``enable all interested parties to influence the 
final resolution of the dispute without significantly impairing the 
efficiency, timeliness and technical quality of the activity.''
    48. Accordingly, it is ordered that Subpart Q, Part 64 of the 
Commission's rules is adopted effective June 17, 1996 as set forth 
below.
    49. The action taken herein is taken pursuant to sections 4(i), 
4(j), 273(d)(5), 303(r) and 403 of the Communications Act, 47 U.S.C. 
Secs. 154(i) and (j), 273(d)(5), 303(r) and 403.

List of Subjects in 47 CFR Part 64

    Communications common carriers, Dispute resolution process, 
Manufacturing by Bell Operating Companies, Non-accredited standards 
development organizations, Penalties for delaying parties.

Federal Communications Commission.
William F. Caton,
Acting Secretary.

Rule Changes

    Part 64 of Title 47 of the Code of Federal Regulations is amended 
as follows:

PART 64--MISCELLANEOUS RULES RELATING TO COMMON CARRIERS

    1. The authority citation for Part 64 is revised to read as 
follows:

    Authority: 47 U.S.C. 154, unless otherwise noted. Interpret or 
apply 47 U.S.C. 201, 218, 226, 228, 273(d)(5), unless otherwise 
noted.

    2. A new Subpart Q is added to Part 64 to read as follows:
Subpart Q--Implementation of Section 273(d)(5) of the Communications 
Act: Dispute Resolution Regarding Equipment Standards
Sec.
64.1700  Purpose and scope.
64.1701  Definitions.
64.1702  Procedures.
64.1703  Dispute resolution default process.
64.1704  Frivolous disputes/penalties.

Subpart Q--Implementation of Section 273(d)(5) of the Communiations 
Act: Dispute Resolution Regarding Equipment Standards

Sec. 64.1700  Purpose and scope.

    The purpose of this subpart is to implement the Telecommunications 
Act of 1996 which amended the Communications Act by creating section 
273(d)(5), 47 U.S.C. 273(d)(5). Section 273(d) sets forth procedures to 
be followed by non-accredited standards development organizations when 
these organizations set industry-wide standards and generic 
requirements for telecommunications equipment or customer premises 
equipment. The statutory procedures allow outside parties to fund and 
participate in setting the organization's standards and require the 
organization and the parties to develop a process for resolving any 
technical disputes. In cases where all parties cannot agree to a 
mutually satisfactory dispute resolution process, section 273(d)(5) 
requires the Commission to prescribe a dispute resolution process.

Sec. 64.1701  Definitions.

    For purposes of this subpart, the terms ``accredited standards 
development organization,'' ``funding party,'' ``generic requirement,'' 
and ``industry-wide'' have the same meaning as found in 47 U.S.C. 273.

Sec. 64.1702  Procedures.

    If a non-accredited standards development organization (NASDO) and 
the funding parties are unable to agree unanimously on a dispute 
resolution process prior to publishing a text for comment pursuant to 
47 U.S.C. 273(d)(4)(A)(v), a funding party may use the default dispute 
resolution process set forth in section 64.1703.

Sec. 64.1703  Dispute resolution default process.

    (a) Tri-Partite Panel. Technical disputes governed by this section 
shall be resolved in accordance with the recommendation of a three-
person panel, subject to a vote of the funding parties in accordance 
with paragraph (b) of this section. Persons who participated in the 
generic requirements or standards development process are eligible to 
serve on the panel. The panel shall be selected and operate as follows:
    (1) Within two (2) days of the filing of a dispute with the NASDO 
invoking the dispute resolution default process, both the funding party 
seeking dispute resolution and the NASDO shall select a representative 
to sit on the panel;
    (2) Within four (4) days of their selection, the two panelists 
shall select

[[Page 24904]]

a neutral third panel member to create a tri-partite panel;
    (3) The tri-partite panel shall, at a minimum, review the proposed 
text of the NASDO and any explanatory material provided to the funding 
parties by the NASDO, the comments and any alternative text provided by 
the funding party seeking dispute resolution, any relevant standards 
which have been established or which are under development by an 
accredited-standards development organization, and any comments 
submitted by other funding parties;
    (4) Any party in interest submitting information to the panel for 
consideration (including the NASDO, the party seeking dispute 
resolution and the other funding parties) shall be asked by the panel 
whether there is knowledge of patents, the use of which may be 
essential to the standard or generic requirement being considered. The 
fact that the question was asked along with any affirmative responses 
shall be recorded, and considered, in the panel's recommendation; and
    (5) The tri-partite panel shall, within fifteen (15) days after 
being established, decide by a majority vote, the issue or issues 
raised by the party seeking dispute resolution and produce a report of 
their decision to the funding parties. The tri-partite panel must adopt 
one of the five options listed below:
    (i) The NASDO's proposal on the issue under consideration;
    (ii) The position of the party seeking dispute resolution on the 
issue under consideration;
    (iii) A standard developed by an accredited standards development 
organization that addresses the issue under consideration;
    (iv) A finding that the issue is not ripe for decision due to 
insufficient technical evidence to support the soundness of any one 
proposal over any other proposal; or
    (v) Any other resolution that is consistent with the standard 
described in section 64.1703(a)(6).
    (6) The tri-partite panel must choose, from the five options 
outlined above, the option that they believe provides the most 
technically sound solution and base its recommendation upon the 
substantive evidence presented to the panel. The panel is not precluded 
from taking into account complexity of implementation and other 
practical considerations in deciding which option is most technically 
sound. Neither of the disputants (i.e., the NASDO and the funding party 
which invokes the dispute resolution process) will be permitted to 
participate in any decision to reject the mediation panel's 
recommendation.
    (b) The tri-partite panel's recommendation(s) must be included in 
the final industry-wide standard or industry-wide generic requirement, 
unless three-fourths of the funding parties who vote decide within 
thirty (30) days of the filing of the dispute to reject the 
recommendation and accept one of the options specified in paragraphs 
(a)(5) (i) through (v) of this section. Each funding party shall have 
one vote.
    (c) All costs sustained by the tri-partite panel will be 
incorporated into the cost of producing the industry-wide standard or 
industry-wide generic requirement.

Sec. 64.1704  Frivolous disputes/penalties.

    (a) No person shall willfully refer a dispute to the dispute 
resolution process under this subpart unless to the best of his 
knowledge, information and belief there is good ground to support the 
dispute and the dispute is not interposed for delay.
    (b) Any person who fails to comply with the requirements in 
paragraph (a) of this section, may be subject to forfeiture pursuant to 
section 503(b) of the Communications Act, 47 U.S.C. 503(b).

[FR Doc. 96-12217 Filed 5-16-96; 8:45 am]
BILLING CODE 6712-01-U

Complete official Federal Register PDF

FR Doc. 96-12188 Cargo PreferenceU.S.-Flag Vessels; Available U.S.-Flag Commercial Vessels
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24895-24897]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12188]

=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Maritime Administration
46 CFR Part 381
[Docket No. R-165]
RIN 2133-AB25

Cargo Preference--U.S.-Flag Vessels; Available U.S.-Flag 
Commercial Vessels
AGENCY: Maritime Administration, Department of Transportation.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment to the cargo preference regulations of the 
Maritime Administration (MARAD) provides that during the five year 
period beginning with the 1996 Great Lakes shipping season when the St. 
Lawrence Seaway is in use, MARAD will consider the legal requirement 
for the carriage of bulk agricultural commodity preference cargoes on 
privately-owned ``available'' U.S.-flag commercial vessels to have been 
satisfied where the cargo is initially loaded at a Great Lakes port on 
one or more U.S.-flag or foreign-flag vessels, transferred to a U.S.-
flag commercial vessel at a Canadian transshipment point outside the 
St. Lawrence Seaway, and carried on that U.S.-flag vessel to a foreign 
destination. This provision will allow U.S. Great Lakes ports to 
compete for certain bulk agricultural commodity preference cargoes 
under agricultural assistance programs administered by the U.S. 
Department of Agriculture (USDA) and the U.S. Agency for International 
Development (USAID). This rule will extend that policy for an 
additional five years, after which the Agency would assess the merits 
of making the rule permanent. MARAD issued substantially identical 
rules in 1994 and 1995 related to the Great Lakes Shipping season for 
each of those years, respectively.

EFFECTIVE DATE: May 17, 1996.

FOR FURTHER INFORMATION CONTACT: John E. Graykowski, Deputy Maritime 
Administrator for Inland Waterways and Great Lakes, Maritime 
Administration, Washington, DC, Telephone (202)366-1718.

SUPPLEMENTARY INFORMATION: United States law at sections 901(b) and 
901b, Merchant Marine Act, 1936, as amended (the ``Act''), 46 App. 
U.S.C. 1241(b) and 1241f, requires that at least 75 percent of certain 
agricultural product cargoes ``impelled'' by Federal programs 
(preference cargoes), and transported by sea, be carried on privately-
owned United States-flag commercial vessels, to the extent that such 
vessels ``are available at fair and reasonable rates for United States-
flag commercial vessels, in such manner as will insure a fair and 
reasonable participation of United States-Flag commercial vessels in 
such cargoes by geographical areas.'' The Secretary of Transportation 
wishes to administer that program so that all ports and port ranges, 
including U.S. Great Lakes ports, may participate in the carriage of 
preference cargoes under five programs administered by the United 
States Department of Agriculture (USDA) and United States Agency for 
International Development (USAID), pursuant to Titles I, II and III of 
the Agricultural Trade Development and Assistance Act of 1954, as 
amended; P.L. 480 (7 U.S.C. 1701-1727); the Agricultural Act of 1949, 
as amended (7 U.S.C. 2791(c)); and the Food for Progress Act of 1985, 
as amended (7 U.S.C. 1736).

Prior Rulemakings

    On August 18, 1994, MARAD published a final rule on this subject in 
the Federal Register (59 FR 40261). That rule stated that it was 
intended to allow U.S. Great Lakes ports to participate with ports in 
other U.S. port ranges in the carriage of bulk agricultural commodity 
preference cargoes. It stated that dramatic changes in shipping 
conditions have occurred since 1990, including the disappearance of any 
all-U.S.-flag commercial ocean-going bulk cargo service to foreign 
countries from U.S. Great Lakes ports. The static configuration of the 
St. Lawrence Seaway system and the evolving greater size of commercial 
vessels contributed to the disappearance of any all-U.S.-flag service.

    No bulk grain preference cargo has moved on U.S.-flag vessels out 
of the Great Lakes since 1989, with the exception of one trial shipment 
in 1993. Under the Food Security Act of 1985, Public Law 99-198, 
codified at 46 app. U.S.C. 1241f(c)(2), a certain minimum amount of 
Government-impelled cargo was required to be allocated to Great Lakes 
ports during the Great Lakes shipping seasons of 1986, 1987, 1988 and 
1989. That ``set-aside'' expired in 1989, and was not renewed by the 
Congress. The disappearance of

[[Page 24896]]

Government-impelled agricultural cargo flowing from the Great Lakes 
coincided with the expiration of the Great Lakes ``set-aside.''
    At the time of the opening of the 1994 Great Lakes shipping season 
on April 5, 1994, the Great Lakes did not have any all-U.S.-flag ocean 
freight capability for carriage of bulk preference cargo. The absence 
of any all-U.S.-flag ocean freight capability on the Great Lakes 
continues to this day. In contrast, the total export nationwide by non-
liner vessels of USDA and USAID agricultural assistance program cargoes 
subject to cargo preference in the 1994-1995 cargo preference year (the 
latest program year for which figures are available) amounted to 6.2 
million metric tons, of which 4.9 million (78 percent) was transported 
on U.S.-flag vessels.
    As predicted by numerous commenters, the timing of the 1994 final 
rule, published on August 18, 1994, did not allow for a true trial 
period since it actually extended for less than one-half of the 1994 
Great Lakes Shipping season. Because of the long lead time required for 
arranging shipments of bulk agriculture commodity preference cargoes, 
there apparently was no real opportunity for U.S.-flag vessel operators 
to make the necessary arrangements and bid on preference cargoes. 
Accordingly, MARAD proposed to extend this policy to the 1995 Great 
Lakes shipping season and issued a final rule that was published in the 
Federal Register on May 9, 1995 (60 FR 24560).
    Great Lakes participation in cargo preference shipments under the 
five programs administered by the USDA and USAID could be significantly 
improved if foreign-flag feeder vessels were authorized to transport 
bulk grain commodities from Great Lakes ports to Canadian transshipment 
points for export on oceangoing U.S.-flag bulk carriers to the final 
destination port. MARAD issued its 1994 and 1995 final rules to 
authorize the use of foreign-flag feeder vessels for the transportation 
of bulk agricultural commodities cargoes from the Great Lakes ports to 
Canadian transshipment ports outside the St. Lawrence Seaway during the 
1994 and 1995 Great Lakes shipping seasons, respectively. Outside the 
St. Lawrence Seaway, the cargo will be transferred to a U.S.-flag 
vessel for delivery to its foreign destination.
    Subsequently, USDA indicated that section 406(b)(4) of P.L. 480 
regulating the payment of freight by USDA for shipments under Title II, 
Section 416(b) and the Food For Progress Act of 1985, negatively 
impacted on suppliers that bid on Great Lakes cargoes to be transhipped 
to Canadian shipping points. USDA indicated that these provisions 
prevent them from paying for freight on commodities shipped from a 
Canadian port. The P.L. 480 Title I program is not affected by this 
provision. As a consequence, the Great Lakes region has been, in 
effect, prohibited from utilizing the rule and participating during the 
past two years in the shipment of bulk cargo under Title II of P.L. 
480, Section 416 of the Agricultural Act of 1949 and the Food for 
Progress Act of 1985 programs.
    USDA proposed an amendment to Section 406 in the 1996 Farm Bill 
which would allow USDA to pay the cost of the foreign-flag Great Lakes 
transit leg and for the transshipment from Canadian ports.
    MARAD proposed in a new NPRM to extend its policy stated in the 
1994 and 1995 rules for an additional five years, after which it would 
reassess the merits of making the rule permanent, consistent with the 
USDA legislative proposal (61 FR 9670; March 11, 1996). The amendment 
proposed by the USDA is included in the Federal Agriculture Improvement 
and Reform Act of 1966, Pub. L. 104-127, 110 Stat. 888. It amends 
Section 406(b)(4) of the Agricultural Trade, Development and Assistance 
Act of 1954, 7 U.S.C. 1736, to accomplish USDA's proposal, above.

Comments on 1996 NPRM

    MARAD received 12 comments on this NPRM from 11 commenters 
representing business, trade associations, State and local port 
authorities, and State Transportation Departments. All commenters were 
in favor of the policy stated in the NPRM, without reservation. One 
commenter supporting the proposal to establish a five-year trial period 
stated, ``Similar rulemakings in the 1994 and 1995 years provided too 
limited of a window of opportunity to truly test this concept.'' That 
commenter referred to the current common practice in the private sector 
of exporting bulk agricultural commodities from Great Lakes ports in 
foreign-flag feeder vessels to transshipment points east of the St. 
Lawrence Seaway, concluding that ``transshipping Government 
agricultural exports should, on occasion, be cost effective.''
    Another commenter stated that taxpayers, food aid recipient 
countries and vessel owners will benefit from this competition. From 
the perspective of U.S. maritime labor, one commenter stated, 
``International cargoes are the lifeblood of Great Lakes longshoremen 
and return of P.L. 480 cargoes to the Great Lakes will generate 
thousands of manhours for dockworkers in virtually every Great Lakes 
port.'' Another commenter was hopeful that the trend of increased 
international trade ``to the Lakes via the Seaway in the past three 
navigation seasons will continue because of this rulemaking.''
    One commenter, while acknowledging that the proposed rule offers 
some possible relief for Great Lakes-originated cargo, requested MARAD 
to issue a rule which allows shipment of bulk agricultural commodities 
from Great Lakes ports for the entire voyage from origin to destination 
on foreign-flag vessels where U.S.-flag vessels are not available for 
such voyages from Great Lakes ports. Unless U.S.-flag vessels are 
unavailable from any port range in the United States, MARAD lacks the 
authority to issue such a rule under the cargo preference laws of the 
United States.

Rulemaking Analyses and Notices

Executive Order 12866 (Regulatory Planning and Review)

    This rulemaking is not considered to be an economically significant 
regulatory action under section 3(f) of Executive Order 12866. Also, it 
is not a major rule under Pub. L. 104-121, 5 U.S.C. 804, or a 
significant rule under the Department's Regulatory Policies and 
Procedures. Accordingly, it has not been reviewed by the Office of 
Management and Budget.
    MARAD projects that this rule will allow the annual movement of up 
to 300,000 metric tons of agricultural commodities from Great Lakes 
ports, with a reduction in the shipping cost to sponsoring Federal 
agencies of up to $2 per metric ton ($600,000). MARAD will evaluate the 
results of this rulemaking over a five-year trial period before 
determining whether to issue a rule to make this provision permanent.
    Since the 1996 Great Lakes shipping season opened on March 29, 
1996, a delay in the effective date of this rule for 30 days would be 
conterproductive to the accomplishment of the purpose of this rule to 
allow U.S. Great Lakes ports to compete effectively for agricultural 
commodity preference cargo shipments. Accordingly, pursuant to section 
553(d) of the Administrative Procedure Act, 5 U.S.C. 553(d), MARAD 
finds that good cause exists for the rule to become effective on 
publication.

Federalism

    The Maritime Administration has analyzed this rulemaking in 
accordance with the principles and criteria contained in Executive 
Order 12612, and it has been determined that these regulations do not 
have sufficient

[[Page 24897]]

federalism implications to warrant the preparation of a Federalism 
Assessment.

Regulatory Flexibility Act

    The Maritime Administration certifies that this rulemaking will not 
have a significant economic impact on a substantial number of small 
entities.

Environmental Assessment

    The Maritime Administration has considered the environmental impact 
of this rulemaking and has concluded that an environmental impact 
statement is not required under the National Environmental Policy Act 
of 1969.

Paperwork Reduction Act

    This rulemaking contains no reporting requirement that is subject 
to OMB approval under 5 CFR Part 1320, pursuant to the Paperwork 
Reduction Act of 1980 (44 U.S.C. 3501, et seq.)

List of Subjects in 46 CFR Part 381

    Freight, Maritime carriers.

    Accordingly, MARAD hereby amends 46 CFR Part 381 as follows:

PART 381--[AMENDED]

    1. The authority citation for Part 381 continues to read as 
follows:

    Authority: 46 App. U.S.C. 1101, 1114(b), 1122(d) and 1241; 49 
CFR 1.66.

    2. Section 381.9 is revised to read as follows:

Sec. 381.9  Available U.S.-flag service.

    For purposes of shipping bulk agricultural commodities under 
programs administered by sponsoring Federal agencies from U.S. Great 
Lakes ports during the 1996-2000 Great Lakes shipping seasons, if 
direct all-U.S.-flag service, at fair and reasonable rates, is not 
available at U.S. Great Lakes ports, a joint service involving a 
foreign-flag vessel(s) carrying cargo no farther than a Canadian 
port(s) or other point(s) on the Gulf of St. Lawrence, with 
transshipment via a U.S.-flag privately-owned commercial vessel to the 
ultimate foreign destination, will be deemed to comply with the 
requirement of ``available'' commercial U.S.-flag service under the 
Cargo Preference Act of 1954. Shipper agencies considering bids 
resulting in the lowest landed cost of transportation based on U.S.-
flag rates and service shall include within the comparison of U.S.-flag 
rates and service, for shipments originating in U.S. Great Lakes ports, 
through rates (if offered) to a Canadian port or other point on the 
Gulf of St. Lawrence and a U.S.-flag leg for the remainder of the 
voyage. The ``fair and reasonable'' rate for this mixed service will be 
determined by considering the U.S.-flag component under the existing 
regulations at 46 CFR Part 382 or 383, as appropriate, and 
incorporating the cost for the foreign-flag component into the U.S.-
flag ``fair and reasonable'' rate in the same way as the cost of 
foreign-flag vessels used to lighten U.S.-flag vessels in the recipient 
country's territorial waters. Alternatively, the supplier of the 
commodity may offer the Cargo FOB Canadian transshipment point, and 
MARAD will determine fair and reasonable rates accordingly.

    Dated: May 10, 1996.

    By Order of the Maritime Administrator.
Joel Richard,
Secretary, Maritime Administration.
[FR Doc. 96-12188 Filed 5-16-96; 8:45 am]
BILLING CODE 4910-81-P

Complete official Federal Register PDF

FR Doc. 96-11799 United States Trustees; Guidelines Relating to the Bankruptcy Reform Act of 1994
[Federal Register Volume 61, Number 97 (Friday, May 17, 1996)]
[Rules and Regulations]
[Pages 24889-24892]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11799]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF JUSTICE
28 CFR Part 58

United States Trustees; Guidelines Relating to the Bankruptcy 
Reform Act of 1994
AGENCY: Department of Justice.

ACTION: Final internal procedural guidelines.

-----------------------------------------------------------------------

SUMMARY: The Department of Justice is establishing internal procedural 
guidelines for reviewing applications for compensation and 
reimbursement of expenses filed by case trustees and professionals 
under section 330 of Title 11, United States Code. These procedural 
guidelines are not intended to supersede local rules, but are to be 
read as complementing the procedures set forth in local rules.
    To keep all published rules, regulations, and guidelines pertaining 
to the United States Trustee Program in one section of the Code of 
Federal Regulations, the title to 28 CFR 58 will be amended to include 
the Bankruptcy Reform Act of 1994.

EFFECTIVE DATE: January 30, 1996.

FOR FURTHER INFORMATION CONTACT:
Martha L. Davis, General Counsel, or Kathleen Dunivin Schmitt, 
Attorney, (202) 307-1399. This is not a toll-free number.

SUPPLEMENTARY INFORMATION: This action is in response to the Bankruptcy 
Reform Act of 1994, which amended 28 U.S.C. 586(a)(3)(A) to direct 
United States Trustees to review applications for compensation and 
reimbursement of expenses in accordance with procedural guidelines 
adopted by the Executive Office for United States Trustees. The 
guidelines are to be applied uniformly by the United States Trustees, 
except when circumstances warrant different treatment.

[[Page 24890]]

Executive Order 12866

    These guidelines have been drafted and reviewed in accordance with 
Executive Order 12866, section 1(b), Principles of Regulation. The 
Director, Executive Office for United States Trustees, has determined 
that these guidelines are not a ``significant regulatory action'' under 
Executive Order 12866 section 3(f), Regulatory Planning and Review. 
These guidelines pertain to the internal management of the Department 
and as such are not subject to central Office of Management and Budget 
review pursuant to section 6 of Executive Order 12866. Accordingly, 
these guidelines have not been reviewed by the Office of Management and 
Budget pursuant to Executive Order 12866.

Regulatory Flexibility Act

    The Director, Executive Office for United States Trustees, in 
accordance with the Regulatory Flexibility Act (5 U.S.C. Sec. 605(b)), 
has reviewed these guidelines and by approving them certifies that 
these guidelines will not have a significant economic impact on a 
substantial number of small entities.

List of Subjects in 28 CFR Part 58

    Bankruptcy, Trusts, and Trustees.

    For the reasons set forth in the preamble, the Department of 
Justice proposes to amend 28 CFR part 58 as follows:

PART 58--REGULATIONS RELATING TO THE BANKRUPTCY REFORM ACTS OF 1978 
AND 1994

    1. The heading of Part 58 is revised to read as set forth above.
    2. The authority citation for Part 58 continues to read as follows:

    Authority: 28 U.S.C. 509, 510, 586(e), 588(d).

    3. Appendix A is added to Part 58 to read as follows:

Appendix A to Part 58--Guidelines for Reviewing Applications for 
Compensation and Reimbursement of Expenses Filed Under 11 U.S.C. 330

    (a) General Information. (1) The Bankruptcy Reform Act of 1994 
amended the responsibilities of the United States Trustees under 28 
U.S.C. 586(a)(3)(A) to provide that, whenever they deem appropriate, 
United States Trustees will review applications for compensation and 
reimbursement of expenses under section 330 of the Bankruptcy Code, 
11 U.S.C. 101, et seq. (``Code''), in accordance with procedural 
guidelines (``Guidelines'') adopted by the Executive Office for 
United States Trustees (``Executive Office''). The following 
Guidelines have been adopted by the Executive Office and are to be 
uniformly applied by the United States Trustees except when 
circumstances warrant different treatment.
    (2) The United States Trustees shall use these Guidelines in all 
cases commenced on or after October 22, 1994.
    (3) The Guidelines are not intended to supersede local rules of 
court, but should be read as complementing the procedures set forth 
in local rules.
    (4) Nothing in the Guidelines should be construed:
    (i) To limit the United States Trustee's discretion to request 
additional information necessary for the review of a particular 
application or type of application or to refer any information 
provided to the United States Trustee to any investigatory or 
prosecutorial authority of the United States or a state;
    (ii) To limit the United States Trustee's discretion to 
determine whether to file comments or objections to applications; or
    (iii) To create any private right of action on the part of any 
person enforceable in litigation with the United States Trustee or 
the United States.
    (5) Recognizing that the final authority to award compensation 
and reimbursement under section 330 of the Code is vested in the 
Court, the Guidelines focus on the disclosure of information 
relevant to a proper award under the law. In evaluating fees for 
professional services, it is relevant to consider various factors 
including the following: the time spent; the rates charged; whether 
the services were necessary to the administration of, or beneficial 
towards the completion of, the case at the time they were rendered; 
whether services were performed within a reasonable time 
commensurate with the complexity, importance, and nature of the 
problem, issue, or task addressed; and whether compensation is 
reasonable based on the customary compensation charged by comparably 
skilled practitioners in non-bankruptcy cases. The Guidelines thus 
reflect standards and procedures articulated in section 330 of the 
Code and Rule 2016 of the Federal Rules of Bankruptcy Procedure for 
awarding compensation to trustees and to professionals employed 
under section 327 or 1103. Applications that contain the information 
requested in these Guidelines will facilitate review by the Court, 
the parties, and the United States Trustee.
    (6) Fee applications submitted by trustees are subject to the 
same standard of review as are applications of other professionals 
and will be evaluated according to the principles articulated in 
these Guidelines. Each United States Trustee should establish 
whether and to what extent trustees can deviate from the format 
specified in these Guidelines without substantially affecting the 
ability of the United States Trustee to review and comment on their 
fee applications in a manner consistent with the requirements of the 
law.
    (b) Contents of Applications for Compensation and Reimbursement 
of Expenses. All applications should include sufficient detail to 
demonstrate compliance with the standards set forth in 11 U.S.C. 
Sec. 330. The fee application should also contain sufficient 
information about the case and the applicant so that the Court, the 
creditors, and the United States Trustee can review it without 
searching for relevant information in other documents. The following 
will facilitate review of the application.
    (1) Information about the Applicant and the Application. The 
following information should be provided in every fee application:
    (i) Date the bankruptcy petition was filed, date of the order 
approving employment, identity of the party represented, date 
services commenced, and whether the applicant is seeking 
compensation under a provision of the Bankruptcy Code other than 
section 330.
    (ii) Terms and conditions of employment and compensation, source 
of compensation, existence and terms controlling use of a retainer, 
and any budgetary or other limitations on fees.
    (iii) Names and hourly rates of all applicant's professionals 
and paraprofessionals who billed time, explanation of any changes in 
hourly rates from those previously charged, and statement of whether 
the compensation is based on the customary compensation charged by 
comparably skilled practitioners in cases other than cases under 
title 11.
    (iv) Whether the application is interim or final, and the dates 
of previous orders on interim compensation or reimbursement of 
expenses along with the amounts requested and the amounts allowed or 
disallowed, amounts of all previous payments, and amount of any 
allowed fees and expenses remaining unpaid.
    (v) Whether the person on whose behalf the applicant is employed 
has been given the opportunity to review the application and whether 
that person has approved the requested amount.
    (vi) When an application is filed less than 120 days after the 
order for relief or after a prior application to the Court, the date 
and terms of the order allowing leave to file at shortened 
intervals.
    (vii) Time period of the services or expenses covered by the 
application.
    (2) Case Status. The following information should be provided to 
the extent that it is known to or can be reasonably ascertained by 
the applicant:
    (i) In a chapter 7 case, a summary of the administration of the 
case including all moneys received and disbursed in the case, when 
the case is expected to close, and, if applicant is seeking an 
interim award, whether it is feasible to make an interim 
distribution to creditors without prejudicing the rights of any 
creditor holding a claim of equal or higher priority.
    (ii) In a chapter 11 case, whether a plan and disclosure 
statement have been filed and, if not yet filed, when the plan and 
disclosure statement are expected to be filed; whether all quarterly 
fees have been paid to the United States Trustee; and whether all 
monthly operating reports have been filed.
    (iii) In every case, the amount of cash on hand or on deposit, 
the amount and nature of accrued unpaid administrative expenses, and 
the amount of unencumbered funds in the estate.
    (iv) Any material changes in the status of the case that occur 
after the filing of the fee

[[Page 24891]]

application should be raised, orally or in writing, at the hearing 
on the application or, if a hearing is not required, prior to the 
expiration of the time period for objection.
    (3) Summary Sheet. All applications should contain a summary or 
cover sheet that provides a synopsis of the following information:
    (i) Total compensation and expenses requested and any amount(s) 
previously requested;
    (ii) Total compensation and expenses previously awarded by the 
court;
    (iii) Name and applicable billing rate for each person who 
billed time during the period, and date of bar admission for each 
attorney;
    (iv) Total hours billed and total amount of billing for each 
person who billed time during billing period; and
    (v) Computation of blended hourly rate for persons who billed 
time during period, excluding paralegal or other paraprofessional 
time.
    (4) Project Billing Format. (i) To facilitate effective review 
of the application, all time and service entries should be arranged 
by project categories. The project categories set forth in Exhibit A 
should be used to the extent applicable. A separate project category 
should be used for administrative matters and, if payment is 
requested, for fee application preparation.
    (ii) The United States Trustee has discretion to determine that 
the project billing format is not necessary in a particular case or 
in a particular class of cases. Applicants should be encouraged to 
consult with the United States Trustee if there is a question as to 
the need for project billing in any particular case.
    (iii) Each project category should contain a narrative summary 
of the following information:
    (A) a description of the project, its necessity and benefit to 
the estate, and the status of the project including all pending 
litigation for which compensation and reimbursement are requested;
    (B) identification of each person providing services on the 
project; and
    (C) a statement of the number of hours spent and the amount of 
compensation requested for each professional and paraprofessional on 
the project.
    (iv) Time and service entries are to be reported in 
chronological order under the appropriate project category.
    (v) Time entries should be kept contemporaneously with the 
services rendered in time periods of tenths of an hour. Services 
should be noted in detail and not combined or ``lumped'' together, 
with each service showing a separate time entry; however, tasks 
performed in a project which total a de minimis amount of time can 
be combined or lumped together if they do not exceed .5 hours on a 
daily aggregate. Time entries for telephone calls, letters, and 
other communications should give sufficient detail to identify the 
parties to and the nature of the communication. Time entries for 
court hearings and conferences should identify the subject of the 
hearing or conference. If more than one professional from the 
applicant firm attends a hearing or conference, the applicant should 
explain the need for multiple attendees.
    (5) Reimbursement for Actual, Necessary Expenses. Any expense 
for which reimbursement is sought must be actual and necessary and 
supported by documentation as appropriate. Factors relevant to a 
determination that the expense is proper include the following:
    (i) Whether the expense is reasonable and economical. For 
example, first class and other luxurious travel mode or 
accommodations will normally be objectionable.
    (ii) Whether the requested expenses are customarily charged to 
non-bankruptcy clients of the applicant.
    (iii) Whether applicant has provided a detailed itemization of 
all expenses including the date incurred, description of expense 
(e.g., type of travel, type of fare, rate, destination), method of 
computation, and, where relevant, name of the person incurring the 
expense and purpose of the expense. Itemized expenses should be 
identified by their nature (e.g., long distance telephone, copy 
costs, messengers, computer research, airline travel, etc,) and by 
the month incurred. Unusual items require more detailed explanations 
and should be allocated, where practicable, to specific projects.
    (iv) Whether applicant has prorated expenses where appropriate 
between the estate and other cases (e.g., travel expenses applicable 
to more than one case) and has adequately explained the basis for 
any such proration.
    (v) Whether expenses incurred by the applicant to third parties 
are limited to the actual amounts billed to, or paid by, the 
applicant on behalf of the estate.
    (vi) Whether applicant can demonstrate that the amount requested 
for expenses incurred in-house reflect the actual cost of such 
expenses to the applicant. The United States Trustee may establish 
an objection ceiling for any in-house expenses that are routinely 
incurred and for which the actual cost cannot easily be determined 
by most professionals (e.g., photocopies, facsimile charges, and 
mileage).
    (vii) Whether the expenses appear to be in the nature 
nonreimbursable overhead. Overhead consists of all continuous 
administrative or general costs incident to the operation of the 
applicant's office and not particularly attributable to an 
individual client or case. Overhead includes, but is not limited to, 
word processing, proofreading, secretarial and other clerical 
services, rent, utilities, office equipment and furnishings, 
insurance, taxes, local telephones and monthly car phone charges, 
lighting, heating and cooling, and library and publication charges.
    (viii) Whether applicant has adhered to allowable rates for 
expenses as fixed by local rule or order of the Court.

Exhibit A--Project Categories

    Here is a list of suggested project categories for use in most 
bankruptcy cases. Only one category should be used for a given 
activity. Professionals should make their best effort to be 
consistent in their use of categories, whether within a particular 
firm or by different firms working on the same case. It would be 
appropriate for all professionals to discuss the categories in 
advance and agree generally on how activities will be categorized. 
This list is not exclusive. The application may contain additional 
categories as the case requires. They are generally more applicable 
to attorneys in chapter 7 and chapter 11, but may be used by all 
professionals as appropriate.
    Asset Analysis and Recovery: Identification and review of 
potential assets including causes of action and non-litigation 
recoveries.
    Asset Disposition: Sales, leases (Sec. 365 matters), abandonment 
and related transaction work.
    Business Operations: Issues related to debtor-in-possession 
operating in chapter 11 such as employee, vendor, tenant issues and 
other similar problems.
    Case Administration: Coordination and compliance activities, 
including preparation of statement of financial affairs; schedules; 
list of contracts; United States Trustee interim statements and 
operating reports; contacts with the United States Trustee; general 
creditor inquiries.
    Claims Administration and Objections: Specific claim inquiries; 
bar date motions; analyses, objections and allowances of claims.
    Employee Benefits/Pensions: Review issues such as severance, 
retention, 401K coverage and continuance of pension plan.
    Fee/Employment Applicants: Preparation of employment and fee 
applications for self or others; motions to establish interim 
procedures.
    Fee/Employment Objections: Review of and objections to the 
employment and fee applications of others.
    Financing: Matters under Secs. 361, 363 and 364 including cash 
collateral and secured claims; loan document analysis.
    Litigation: There should be a separate category established for 
each matter (e.g., XYZ Litigation).
    Meetings of Creditors: Preparing for and attending the 
conference of creditors, the Sec. 341(a) meeting and other 
creditors' committee meetings.
    Plan and Disclosure Statement: Formulation, presentation and 
confirmation; compliance with the plan confirmation order, related 
orders and rules; disbursement and case closing activities, except 
those related to the allowance and objections to allowance of 
claims.
    Relief From Stay Proceedings: Matters relating to termination or 
continuation of automatic stay under Sec. 362.
    The following categories are generally more applicable to 
accountants and financial advisors, but may be used by all 
professionals as appropriate.
    Accounting/Auditing: Activities related to maintaining and 
auditing books of account, preparation of financial statements and 
account analysis.
    Business Analysis: Preparation and review of company business 
plan; development and review of strategies; preparation and review 
of cash flow forecasts and feasibility studies.

[[Page 24892]]

    Corporate Finance: Review financial aspects of potential 
mergers, acquisitions and disposition of company or subsidiaries.
    Data Analysis: Management information systems review, 
installation and analysis, construction, maintenance and reporting 
of significant case financial data, lease rejection, claims, etc.
    Litigation Consulting: Providing consulting and expert witness 
services relating to various bankruptcy matters such as insolvency, 
feasibility, avoiding actions, forensic accounting, etc.
    Reconstruction Accounting: Reconstructing books and records from 
past transactions and bringing accounting current.
    Tax Issues: Analysis of tax issues and preparation of state and 
federal tax returns.
    Valuation: Appraise or review appraisals of assets.

    Dated: April 25, 1996.
Joseph Patchan,
Director.
[FR Doc. 96-11799 Filed 5-16-96; 8:45 am]
BILLING CODE 4410-01-M

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.