Federal Register final rules — 1996-05-24

issue-1996-05-24Federal Register final rules — 1996-05-24Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-13404 Temporary Prohibition of Oxygen Generators as Cargo in Passenger Aircraft
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26418-26419]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13404]

[[Page 26417]]

_______________________________________________________________________

Part VII

Department of Transportation

_______________________________________________________________________

Research and Special Programs Administration

_______________________________________________________________________

49 CFR Parts 171 and 173

Temporary Prohibition of Oxygen Generators as Cargo in Passenger 
Aircraft; Interim Final Rule

Federal Register / Vol. 61, No. 102 / Friday, May 24, 1996 / Rules 
and Regulations

[[Page 26418]]

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Parts 171 and 173

[Docket No. HM-224, Amdt No. 171-146, 173-254]
RIN 2137-AC89

Temporary Prohibition of Oxygen Generators as Cargo in Passenger 
Aircraft

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Interim final rule.

-----------------------------------------------------------------------

SUMMARY: To protect life and property, RSPA is issuing an interim final 
rule temporarily prohibiting the offering for transportation and 
transportation of oxygen generators as cargo in passenger-carrying 
aircraft. This rule applies to both foreign and domestic passenger-
carrying aircraft entering, leaving or operating in the United States 
and to any person offering an oxygen generator for transportation on 
any passenger-carrying aircraft.

DATES: Effective date: This interim final rule is effective May 24, 
1996.
    Comment date: Comments must be received by July 23, 1996.

ADDRESSES: Address comments to the Dockets Unit, Research and Special 
Programs Administration, U.S. Department of Transportation, room 8421, 
400 Seventh Street, SW, Washington, DC 20590-0001. Comments should 
identify the docket number and be submitted in five copies. Persons 
wishing to receive confirmation of receipt of their comments should 
include a self-addressed, stamped postcard. The Dockets Unit is located 
in the Department of Transportation headquarters building (NASSIF 
Building) at the above address on the eighth floor. Public dockets may 
be reviewed there between the hours of 8:30 a.m. and 5 p.m., Monday 
through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: William E. Vincent, Acting Director, 
Office of Policy and Program Support, (202) 366-4831, Research and 
Special Programs Administration, U.S. Department of Transportation, 400 
Seventh Street SW, Washington DC 20590-0001.
SUPPLEMENTARY INFORMATION:

I. Background

    Under a Secretarial delegation (49 CFR 1.53(b)), the Research and 
Special Programs Administration (RSPA) is the administration within the 
Department of Transportation (DOT) primarily responsible for issuing 
regulations implementing the Federal hazardous material transportation 
law (Federal hazmat law), 49 U.S.C. 5101-5127. Under this delegated 
authority, RSPA has issued the Hazardous Materials Regulations (HMR), 
49 CFR Parts 171-180.
    Under delegations from the Secretary of Transportation (49 CFR Part 
1), the authority for enforcement under the Federal hazmat law is 
shared by RSPA and each of four modal administrations: the Federal 
Highway Administration, the Federal Railroad Administration, the 
Federal Aviation Administration (FAA), and the United States Coast 
Guard. FAA has primary enforcement authority concerning transportation 
and shipments of hazardous materials by air. 49 CFR 1.47(k).
    The National Transportation Safety Board and the FAA are 
investigating a recent accident involving a passenger-carrying 
aircraft. Preliminary evidence indicates that oxygen generators 
(chemical) were carried as cargo on board the aircraft and may have 
caused, or contributed to the severity, of the accident. Oxygen 
generators are safely installed inside thermal protective casings in 
the cabins of many passenger-carrying aircraft to provide oxygen in 
emergencies to passengers and certain crew members.
    Some persons have offered, and some air carriers have transported, 
uninstalled generators as cargo on passenger-carrying aircraft under 
authority in the HMR, including Secs. 175.10(a)(2) and 171.11 (which 
authorizes use of the International Civil Aviation Organization (ICAO) 
Technical Instructions).
    In order to preclude the possibility that an oxygen generator 
carried as cargo may cause or contribute to a future incident in air 
commerce, RSPA is issuing this interim final rule prohibiting until 
January 1, 1997, with one exception, transportation in passenger-
carrying aircraft, and offering for transportation in passenger-
carrying aircraft, any oxygen generator as cargo. This regulation 
applies to both foreign and domestic aircraft entering, leaving or 
operating in the United States and to any person offering an oxygen 
generator for transportation on any of those aircraft as cargo.
    This regulation applies to oxygen generators (chemical) and not to 
cylinders containing compressed oxygen. Unlike oxygen generators 
(chemical), compressed oxygen cylinders do not involve heat-producing 
mixing of chemicals to create oxygen. To clarify the applicability of 
the prohibition in this rule, RSPA is adding a definition of ``oxygen 
generator (chemical)'' to 49 CFR Sec. 171.8. That definition reads ``a 
device containing chemicals that upon activation release oxygen as a 
product of chemical reaction.''
    Exceptions to the prohibition are provided for an oxygen generator 
for medical use of a passenger that is carried in the passenger cabin 
and meets the specific safety requirements of Sec. 175.10(a)(7) and for 
a small oxygen generator for personal use that is transported as 
checked baggage and meets the specific safety requirements of 
Sec. 175.10(a)(24).
    Because of the potential safety risk posed by continued 
transportation of oxygen generators as cargo in passenger-carrying 
aircraft, RSPA has determined that good cause exists for making this 
rule effective less than 30 days from its issuance and that notice and 
comment is impractical and contrary to public interest.
    Based on currently available information, RSPA believes that at 
least a temporary ban on offering and transportation of the generators 
is justified on an emergency basis because of the potential for loss of 
life and damage to property. Although an opportunity for public comment 
on this rule has not been provided prior to issuance of this interim 
final rule, RSPA seeks public comment. Based on comments received, NTSB 
and FAA investigation, and RSPA and FAA joint inspection of contract 
maintenance vendors, RSPA may make the ban permanent, terminate or 
modify the ban, or otherwise amend the provisions of this rule. As an 
interim final rule, however, this regulation is in effect and binding 
upon publication in the Federal Register.
    RSPA encourages interested persons to participate in this 
rulemaking by submitting written views, data and information concerning 
this interim final rule. Commenters should provide a reason or basis 
for each comment. RSPA will consider all public comments and will make 
changes to this rule if public comments indicate a change is necessary.

II. Rulemaking Analyses and Notices

Executive Order 12866 and DOT Regulatory Policies and Procedures

    This final rule is considered a significant regulatory action under 
section 3(f) of Executive Order 12866 and therefore is subject to 
review by the Office of Management and Budget. The rule is significant 
according to the Regulatory Policies and Procedures of

[[Page 26419]]

the Department of Transportation (44 FR 11034).
    The changes adopted in this rule should not result in any 
significant additional costs to persons subject to the HMR. About 
150,000 of these oxygen generators are installed on about 1,000 U.S. 
passenger-carrying aircraft. Because of their typical effective life of 
about ten years, it is not necessary to frequently transport these 
generators as uninstalled or not-in-use materials. In addition, 
alternative transportation is available for these generators because 
this rule does not prohibit or inhibit their transportation by highway, 
rail, water or cargo aircraft. Because of the minimal economic impact 
of this rule, a full regulatory evaluation is not warranted.

Executive Order 12612

    This final rule has been analyzed in accordance with the principles 
and criteria in Executive Order 12612 (``Federalism'') and does not 
have sufficient Federalism impacts to warrant the preparation of a 
federalism assessment.

Regulatory Flexibility Act

    I certify that this final rule will not have a significant economic 
impact on a substantial number of small entities. This rule imposes a 
limited prohibition on certain persons subject to the HMR. However, 
there are limited adverse economic impacts on small businesses or other 
organizations.

Paperwork Reduction Act

    There are no information collection requirements in this final 
rule.

Regulation Identifier Number

    A regulation identifier number (RIN) is assigned to each regulatory 
action listed in the Unified Agenda of Federal Regulations. The 
Regulatory Information Service Center publishes the Unified Agenda in 
April and October of each year. The RIN number contained in the heading 
of this document can be used to cross-reference this action with the 
Unified Agenda.

List of Subjects

49 CFR Part 171

    Exports, Hazardous materials transportation, Hazardous waste, 
Imports, Reporting and recordkeeping requirements.

49 CFR Part 173

    Hazardous materials transportation, Packaging and containers, 
Radioactive materials, Reporting and recordkeeping requirements, 
Uranium.
    In consideration of the foregoing, 49 CFR Parts 171 and 173 are 
amended as follows:

PART 171--GENERAL INFORMATION, REGULATIONS, AND DEFINITIONS

    1. The authority citation for Part 171 continues to read as 
follows:

    Authority: 49 U.S.C. 5101-5127, 44701; 49 CFR 1.45, 1.53.

    2. In Sec. 171.8, a definition for ``oxygen generator (chemical)'' 
is added in alphabetical order to read as follows:

Sec. 171.8  Definitions and abbreviations.

* * * * *
    Oxygen generator (chemical) means a device containing chemicals 
that upon activation release oxygen as a product of chemical reaction.
* * * * *

PART 173--SHIPPERS--GENERAL REQUIREMENTS FOR SHIPMENTS AND PACKAGINGS

    3. The authority citation for Part 173 continues to read as 
follows:

    Authority: 49 U.S.C. 5101-5127, 44701; 49 CFR 1.45, 1.53.

    4. In Sec. 173.21, paragraph (k) is added to read as follows:

Sec. 173.21  Forbidden materials and packages.

* * * * *
    (k) Notwithstanding any other provision of this subchapter, 
including Secs. 171.11 and 175.10(a)(2) of this subchapter, an oxygen 
generator (chemical) as cargo on a passenger-carrying aircraft until 
January 1, 1997. This prohibition does not apply to an oxygen generator 
for medical or personal use of a passenger that meets the requirements 
of Sec. 175.10(a)(7) or Sec. 175.10(a)(24) of this subchapter.

    Issued in Washington, DC on May 23, 1996 under authority 
delegated in 49 CFR part 1.

D.K. Sharma,
Administrator, Research and Special Programs Administration.
[FR Doc. 96-13404 Filed 5-23-96; 12:31 pm]
BILLING CODE 4910-60-P

Complete official Federal Register PDF

FR Doc. 96-13165 Regulated Navigation Area: Boston Harbor, Long Island Bridge, Boston, MA
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26105-26106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13165]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 165

[CGD01-96-033]
RIN 2115-AE84

Regulated Navigation Area: Boston Harbor, Long Island Bridge, 
Boston, MA

AGENCY: Coast Guard, DOT.

ACTION: Temporary final rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a temporary Regulated 
Navigation Area (RNA) in the waters surrounding the Long Island Bridge, 
Boston Harbor, Boston, MA. Maintenance and repair work is being 
conducted to ensure bridge integrity. This RNA will increase safety by 
requiring all vessels in the regulated area to operate at a no-wake 
speed.

EFFECTIVE DATES: This temporary final rule is effective May 7, 1996, 
until October 31, 1996, Monday through Friday from 9:30 a.m. until 3:30 
p.m. Comments must be received on or before July 10, 1996.

ADDRESSES: Comments should be mailed to Commanding Officer, U.S. Coast 
Guard Marine Safety Office, 455 Commercial Street, Boston, MA 02109-
1045.

FOR FURTHER INFORMATION CONTACT:
LTJG John Buckley, Vessel Division, Coast Guard Captain of the Port 
Boston, 455 Commercial Street, Boston, MA 02109-1045, (617) 233-3000.

SUPPLEMENTARY INFORMATION:

Request for Comments

    The Coast Guard encourages interested persons to participate in 
this rulemaking by submitting written data, views or arguments. Persons 
submitting comments should include their names and addresses, identify 
this notice (CGD01-96-033) and the specific section of the rule to 
which their comments apply, and give reasons for each comment. Persons 
wanting

[[Page 26106]]

acknowledgment of receipt of comments should enclose a stamped, self-
addressed postcard or envelope.
    The Coast Guard will consider all comments received during the 
comment period and may change this section in view of the comments. The 
Coast Guard plans no public hearing; however, a public hearing may be 
requested by an interested person by writing to the Project Manager at 
the address under addresses. If it is determined that the opportunity 
for oral presentations at a public meeting will aid this rulemaking, 
the Coast Guard will hold such a public hearing at a time and place 
announced by a later notice in the Federal Register.

Background and Purpose

    PEER Consultants, P.C. is conducting repairs and maintenance on the 
Long Island Bridge, Boston Harbor, Boston, MA. Contract work is being 
conducted to ensure bridge integrity by replacing/repairing selected 
structural members of the Long Island Bridge. In order to provide for 
the safe repair and maintenance of the Long Island Bridge, the Coast 
Guard deems an RNA necessary.

Discussion of the Rule

    The RNA includes all waters of Boston Harbor within a 600  x  200 
yard rectangle bound by the following coordinates: 42 deg.18'26'' N, 
070 deg.59'12'' W; 42 deg.18'35'' N, 070 deg.58'51'' W; 42 deg.18'31'' 
N, 070 deg.58'49'' W; 42 deg.18'23'' N, 070 deg.59'09'' W. [Datum: NAD 
1983]. A barge mooring area will be located on the northwestern side of 
the bridge within the RNA boundaries. Also, several work boats and 
barges will be operating in the RNA. Vessels in the regulated area will 
be required to operate at a no-wake speed to protect contract workers 
aboard the work boats and barges. The repair work is scheduled to take 
place from May 7, 1996, until October 31, 1996. Repair work will be 
conducted from 9:30 a.m. to 3:30 p.m., Monday through Friday.
    Good cause exists for publishing a temporary final rule without 
notice and prior to opportunity for comment and without a delayed 
effective date because immediate action is needed to regulate traffic 
in the construction area. However, the Coast Guard is providing an 
opportunity for comment so that changes can be made to this final rule. 
It is in the public interest to have the Long Island Bridge repaired 
and to have a no-wake zone around the bridge during construction. 
Delaying this rule to provide for a notice and comment period would be 
impracticable, unnecessary, and contrary to the public interest. Other 
then commuter boats, this area receives minimal vessel traffic. Since 
repair work will commence at 9:30 a.m. and conclude at 3:30 p.m., 
Monday through Friday, commuter boat schedules will not be 
significantly effected. All commuter boat operators have been notified 
of the regulation.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has not been reviewed by the Office of Management and Budget under that 
order. It is not significant under the regulatory policies and 
procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
section to be so minimal that a full Regulatory Evaluation under 
paragraph 10e of the regulatory policies and procedures of DOT is 
unnecessary.
    The waters in the vicinity of the Long Island Bridge are used by 
commuter vessels, commercial fishing vessels, commercial lobster 
vessels and recreational vessels. Due to the minimal time delay caused 
by the requirement to proceed at a no-wake speed, this regulation is 
not expected to have a significant impact on these vessels.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider the economic impact on small entities of a 
rule for which a general notice of proposed rulemaking is required. 
``Small entities'' may include (1) small businesses and not-for-profit 
organizations that are independently owned and operated and are not 
dominant in their fields, and (2) governmental jurisdictions with 
populations of less than 50,000.
    For reasons set forth in the above Regulatory Evaluation, this rule 
will not have a significant economic impact on a substantial number of 
small entities.

Collection of Information

    This rule contains no information collection requirements under the 
Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612 and has determined that 
this proposal does not have sufficient federalism implications to 
warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this rule 
and concluded that, under paragraph 2.B.2(e)(34)(g) of Commandant 
Instruction M16475.1B, (as amended by 59 FR 38654, July 29, 1994), this 
rule is a Regulated Navigation Area and is categorically excluded from 
further environmental documentation. A written Categorical Exclusion 
Determination and checklist are included in the docket.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

Final Regulation

    For the reasons set out in the preamble, the Coast Guard is 
amending 33 CFR Part 165 as follows:

PART 165--[AMENDED]

    1. The authority citation for part 165 continues to read as 
follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1(g), 
6.04-1, 6.04-6, and 160.5; 49 CFR 1.46.

    2. A temporary Section, Sec. 165.T01-033, is added to read as 
follows:

Sec. 165.T01-033  Regulated Navigation Area; Long Island Bridge, Boston 
Harbor, Boston, MA.

    (a) Location. The following area is a Regulated Navigation Area: 
All waters surrounding the Long Island Bridge, Boston Harbor, Boston, 
MA bound by the following coordinates: 42 deg.18 deg.26'' N, 
070 deg.59'12'' W; 42 deg.18'35'' N, 070 deg.58'51'' W; 42 deg.18'31'' 
N, 070 deg.58'49'' W; 42 deg.18'23'' N, 070 deg.59'09'' W. [Datum: NAD 
1983]
    (b) Effective date. This section is effective Monday through Friday 
from 9:30 a.m. until 3:30 p.m., May 7, 1996, to October 31, 1996.
    (c) Regulations. All vessels shall operate at no-wake speed while 
with the Regulated Navigation Area.

    Dated: May 7, 1996.
J.L. Linnon,
Rear Admiral, U.S. Coast Guard Commander, First Coast Guard District.
[FR Doc. 96-13165 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-13164 Special Local Regulation: Revision to Special Local Regulations, 33 CFR Part 100
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26104-26105]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13164]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 100

[CGDO1-96-016]
RIN 2115-AE46

Special Local Regulation: Revision to Special Local Regulations, 
33 CFR Part 100

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is permanently amending a number of special 
local regulations governing marine events in the First Coast Guard 
District. This rule provides the effective dates for these events in 
1996 and provides that the effective dates for the following years will 
be published in a Federal Register notice.

EFFECTIVE DATE: This section is effective on June 24, 1996.

FOR FURTHER INFORMATION CONTACT:
Lieutenant (Junior Grade) Benjamin M. Algeo, Chief, Boating Affairs 
Branch, First Coast Guard District, (617) 223-8311.

SUPPLEMENTARY INFORMATION:

Regulatory History

    A notice of proposed rulemaking (NPRM) was published on March 22, 
1996, (61 FR 11796) in the Federal Register proposing a permanent 
change to a number of special local regulations governing marine events 
in the First Coast Guard District. No comments were received and no 
hearing was requested.

Background and Purpose

    The Coast Guard is permanently amending 33 CFR Part 100, sections 
100.103--National Sweepstakes Regatta, 100.107--Windjammer Days, 
100.108--Great Kennebec River Whatever Race, 100.111--Stonington 
Lobster Boat Races, 100.505--New Jersey Offshore Grand Prix, and 
removing section 100.109--Whatever Festival Hydroplanes. This final 
rule provides the effective dates for the 1996 events and eliminates 
the need to undergo the rulemaking process for each event annually by 
allowing the dates and times for events in later years to be published 
in a Federal Register notice. This rule varies from the NPRM in that it 
provides notice of the dates and times of the 1996 events, requires 
annual notice in the Federal Register rather than a Coast Guard Notice 
to Mariners, and provides rain dates for the Great Kennebec River 
Whatever Race, the Stonington Lobster Boat Races, and the New Jersey 
Offshore Grand Prix. It also removes section 100.109, the Whatever 
Festival Hydroplanes race, which has been canceled subsequent to the 
published NPRM.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866, and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of

[[Page 26105]]

Transportation (DOT) (44 FR 11040; February 26, 1979). The Coast Guard 
expects the economic impact of this rule to be so minimal that a full 
Regulatory Evaluation, under paragraph 10e of the regulatory policies 
and procedures of DOT, is unnecessary. This conclusion is based on the 
fact that no substantive changes are being made to the special local 
regulations and that notice of the events by a Federal Register notice 
and Coast Guard Notice to Mariners will provide sufficient notice to 
waterways users.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider the economic impact on small entities of a 
rule for which a general notice of proposed rulemaking is required. 
``Small entities'' may include (1) small businesses and not-for-profit 
organizations that are independently owned and operated and are not 
dominant in their fields and (2) governmental jurisdictions with 
populations of less than 50,000.
    For the reasons discussed in the Regulatory Evaluation, the Coast 
Guard certifies under 5 U.S.C. 605(b) that this rule will not have a 
significant economic impact on a substantial number of small entities. 
If, however, you think that your business or organization qualifies as 
a small entity and that this rule will have a significant economic 
impact on your business or organization, please submit a comment 
explaining why you think it qualifies and in what way and to what 
degree this rule will economically affect it.

Collection of Information

    This rule contains no collection of information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612 and has determined that 
this rule does not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.

Environment

    The Coast Guard has considered the environmental impacts of this 
rule and concluded that, under paragraph 2.B.2.e.34(h) of COMDTINST 
16475.1B (as revised by 61 FR 13563, March 27, 1996), this rule 
modifies special local regulations issued in conjunction with regattas 
or marine parades and is categorically excluded from further 
environmental documentation.

List of Subjects in 33 CFR Part 100

    Marine safety, Navigation (water), Reporting and recordkeeping 
requirements, Waterways.

Final Regulation

    For the reasons set out in the preamble, the Coast Guard is 
amending 33 CFR part 100 as follows:
    1. The authority citation for Part 100 continues to read as 
follows:

    Authority: 33 U.S.C. 1233; 49 CFR 1.46 and 33 CFR 100.35.

    2. Section 100.103 is amended by revising paragraph (b) as follows:

Sec. 100.103  National Sweepstakes Regatta, RedBank, NJ.

* * * * *
    (b) Effective period. This section is in effect from 8 a.m. to 6 
p.m. on July 20 and 21, 1996, and each year thereafter on dates and 
times specified in a Federal Register notice.
* * * * *
    3. Section 100.107 is amended by revising paragraph (c) as follows:

Sec. 100.107  Windjammer Days, Boothbay Harbor, ME.

* * * * *
    (c) Effective period. This section is in effect from 2 p.m. to 10 
p.m. on June 26 and 27, 1996, and each year thereafter on dates and 
times specified in a Federal Register notice.
    4. Section 100.108 is amended by revising paragraph (c) as follows:

Sec. 100.108  Great Kennebec River Whatever Race.

* * * * *
    (c) Effective period. This section is in effect from 6 a.m. to 6 
p.m. on June 30, 1996, and each year thereafter on a date and times 
specified in a Federal Register notice. If the event is canceled due to 
weather, this section is effective the following day.

Sec. 100.109  [Removed]

    5. Section 100.109 is removed.
    6. Section 100.111 is amended by revising paragraph (c) as follows:

Sec. 100.111  Stonington Lobster Boat Races, Stonington, ME.

* * * * *
    (c) Effective period. This section is in effect from 10 a.m. to 4 
p.m. on August 3, 1996, and each year thereafter on a date and times 
specified in a Federal Register notice. If the event is canceled due to 
weather, this section is effective the following day.
    7. Section 100.505 is amended by revising paragraph (b) as follows:

Sec. 100.505  New Jersey Offshore Grand Prix.

* * * * *
    (b) Effective period. This section is in effect from 8 a.m. to 5 
p.m. on July 17, 1996, and each year thereafter on a date and times 
specified in a Federal Register notice. If the event is canceled due to 
weather, this section is effective the following day.
* * * * *
    Dated: May 13, 1996.
J.L. Linnon,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 96-13164 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-13163 Special Local Regulation: Swim the Bay, Narragansett Bay, Narragansett, RI
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26103-26104]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13163]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 100

[CGD01-95-170]
RIN 2115-AE46

Special Local Regulation: Swim the Bay, Narragansett Bay, 
Narragansett, RI

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a permanent special local 
regulation for a swimming competition know as Swim the Bay. The event 
will be held on July 27, 1996, and each year thereafter on a date and 
times published in a Federal Register document. This regulation is 
needed to protect the participants from vessel traffic during the 
swimming competition.

EFFECTIVE DATE: This rule is effective on June 24, 1996.

FOR FURTHER INFORMATION CONTACT: Lieutenant (Junior Grade) Benjamin M. 
Algeo, Chief, Boating Affairs Branch, First Coast Guard District, (617) 
223-8311.

SUPPLEMENTARY INFORMATION:

Regulatory History

    A Notice of Proposed Rulemaking (NPRM) was published on March 20, 
1996, (61 FR 11353) proposing the establishment of a permanent special 
local regulation for the annual swimming competition Swim the Bay. The 
NPRM proposed to restrict vessels from approaching within 200 feet of 
any participating swimmer to ensure the safety of participants during 
the event. No comments were received and no hearing was requested.

Background and Purpose

    The annual Swim the Bay competition is a local, traditional event 
that has been held for many years in the East Passage of Narragansett 
Bay, Jamestown/Newport, RI. In the past, the Coast Guard has 
promulgated individual regulations for each year's race. Given the 
recurring nature of the event, the Coast Guard is establishing a 
permanent regulation. This rule establishes a regulated area in the 
East Passage of Narragansett Bay and provides specific guidance to 
control vessel movement during the race. This rule restricts vessels 
from approaching within 200 feet of participating competition swimmers.
    The event consists of two heats of approximately 100 swimmers 
racing 1.7 miles from Coasters Harbor Island beach, Newport, RI, to 
Potters Cove, Jamestown, RI. There will be approximately 25-30 support 
boats on scene to augment a Coast Guard patrol to alert boating traffic 
of the presence of the swimmers. The time period for the event is 
dictated by tidal conditions. Subject to Coast Guard approval, the 
sponsor selects a Saturday in July or August that most closely exhibits 
low tide 40 minutes after 8 a.m. Spectator craft are authorized to 
watch the race from any area as long as they remain 200 feet away from 
any participating swimmer. In emergency situations, provisions may be 
made to establish safe escort by a Coast Guard or Coast Guard 
designated vessel for vessels requiring transit within 200 feet of 
participating swimmers. This final rule varies from the NPRM in that it 
provides the exact date and times for this year's race and provides for 
the effective date and times for subsequent year's events to be 
published in a Federal Register document.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866, and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). Due to the short duration of the event and its 
limited restriction on vessel traffic transiting the East Passage of 
Narragansett Bay, the Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation, under

[[Page 26104]]

paragraph 10e of the regulatory policies and procedures of DOT, is 
unnecessary.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider the economic impact on small entities of a 
rule for which a general notice of proposed rulemaking is required. 
``Small entities'' may include (1) small businesses and not-for-profit 
organizations that are independently owned and operated and are not 
dominant in their fields and (2) governmental jurisdictions with 
populations of less the 50,000.
    For the reasons discussed in the Regulatory Evaluation, the Coast 
Guard certifies under 5 U.S.C. 605(b) that this rule will not have a 
significant economic impact on a substantial number of small entities. 
If, however, you think that your business or organization qualifies as 
a small entity and that this rule will have a significant economic 
impact on your business or organization, please submit a comment 
explaining why you think it qualifies and in what way and to what 
degree this rule will economically affect it.

Collection of Information

    This rule contains no collection of information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq).

Federalism

    The Coast Guard has analyzed this action in accordance with the 
principles and criteria contained in Executive Order 12612, and has 
determined that this rule does not raise sufficient federalism 
implications to warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard has considered the environmental impacts of this 
rule and concluded that, under paragraph 2.B.2.e.34(h) of COMDTINST 
16475.1B, (as revised by 61 FR 13563, March 27, 1996) this rule is a 
regulation issued in conjunction with a regatta or marine parade and is 
categorically excluded from further environmental documentation.

List of Subjects in 33 CFR Part 100

    Marine safety, Navigation (water), Reporting and recordkeeping 
requirements, Waterways.

Final Regulation

    For reasons set out in the preamble, the Coast Guard is amending 33 
CFR Part 100 as follows:
    1. The authority citation for Part 100 continues to read as 
follows:

    Authority: 33 U.S.C. 1233; 49 CFR 1.46 and 33 CFR 100.35.

    2. Section 100.112 is added to read as follows:

Sec. 100.112  Swim the Bay, Narragansett Bay, Narragansett, RI.

    (a) Regulated area. All waters of the East Passage of Narragansett 
Bay within 200 feet of participating competition swimmers.
    (b) Special local regulations. (1) The Coast Guard patrol commander 
may delay, modify, or cancel the race as conditions or circumstances 
require.
    (2) No person or vessel may enter, transit, or remain in the 
regulated area unless participating in the event or unless authorized 
by the Coast Guard patrol commander.
    (3) Vessels encountering emergencies which require transit through 
the regulated area should contact the Coast Guard patrol commander on 
VHF Channel 16. In the event of an emergency, the Coast Guard patrol 
commander may authorize a vessel to transit through the regulated area 
with the Coast Guard designated escort.
    (4) All persons and vessels shall comply with the instructions of 
the Coast Guard on-scene patrol commander. On-scene patrol personnel 
may include commissioned, warrant, and petty officers of the U.S. Coast 
Guard. Upon hearing five or more short blasts from a U.S. Coast Guard 
vessel, the operator of a vessel shall proceed as directed. Members of 
the Coast Guard Auxiliary may also be present to inform vessel 
operators of this regulation and other applicable laws.
    (c) Effective period. This section is effective on July 27, 1996, 
from 10:30 a.m. to 12:30 p.m., and each year thereafter on a date and 
times published in a Federal Register document.

    Dated: May 13, 1996.
J.L. Linnon,
Rear Admiral, U.S. Coast Guard Commander, First Coast Guard District.
[FR Doc. 96-13163 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-13162 Special Local Regulation; Quonset Open House, North Kingstown, RI
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26102-26103]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13162]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 100

[CGD01-96-017]
RIN 2115-AE46

Special Local Regulation; Quonset Open House, North Kingstown, RI

AGENCY: Coast Guard, DOT.

ACTION: Temporary final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a temporary special local 
regulation for an airshow known as the Quonset Open House. The Quonset 
Open House will be held on June 1 and 2, 1996, off Quonset Point, North 
Kingstown, RI. This regulation is needed to protect the boating public 
from the hazards associated with low flying aircraft in the vicinity of 
the airstrip.

EFFECTIVE DATE: This rule is effective on June 1 and 2, 1996, from 9 
a.m. to 4:30 p.m.

FOR FURTHER INFORMATION CONTACT:
Lieutenant (Junior Grade) Benjamin M. Algeo, Chief, Boating Affairs 
Branch, First Coast Guard District, (617) 223-8311.

SUPPLEMENTARY INFORMATION:

Regulatory History

    As authorized by 5 U.S.C. 553, a notice of proposed rulemaking 
(NPRM) was not published for this regulation. Good cause exists for not 
publishing an NPRM and for making this section effective less than 30 
days after Federal Register publication. The application for the event 
was received less than 30 days prior to the event date. Publishing a 
NPRM and delaying the event would be contrary to the public interest 
because the airshow is intended for viewing by the public. The sponsor 
was unable to provide more leadtime due to the difficulties in 
scheduling the participating aircraft.

Background and Purpose

    The Quonset Open House is a local, traditional airshow sponsored by 
the Rhode Island National Guard. Participating aircraft take off and 
land from an airstrip located on Quonset Point, North Kingstown, RI. 
Due to the aircrafts' low flight paths, close proximity to spectator 
vessels, and other water related events, a regulated area is needed to 
protect life and property during the event.
    This section establishes a regulated area in the West Passage of 
Rhode Island Sound, off Quonset Point. It prohibits vessels from 
entering the regulated area during the event. In emergency situations, 
provisions may be made to establish safe escort by a Coast Guard or 
designated Coast Guard vessel for vessels requiring transit through the 
regulated area.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866, and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review of the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation, under 
paragraph 10e of the regulatory policies and procedures of DOT, is 
unnecessary. The effect of this section will not be significant for 
several reasons: the regulated area includes less than half of one 
square nautical mile of Narragansett Bay; entry into the regulated area 
is restricted for a short duration; vessels may transit around the 
regulated area; and the extensive advance advisories which will be 
made.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider the economic impact on small entities of a 
rule for which a general notice of proposed rulemaking is required. 
``Small entities'' may include (1) small businesses and not-for-profit 
organizations that are independently owned and operated and are not 
dominant in their fields and (2) governmental jurisdictions with 
populations of less than 50,000.
    For the reasons discussed in the Regulatory Evaluation, the Coast 
Guard certifies under 5 U.S.C. 605(b) that this rule will not have a 
significant economic impact on a substantial number of small entities. 
If, however, you think that your business or organization qualifies as 
a small entity and that this rule will have a significant economic 
impact on your business or organization, please submit a comment 
explaining why you think it qualifies and in what way and to what 
degree this rule will economically affect it.

Collection of Information

    This rule contains no collection of information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.)

[[Page 26103]]

Federalism

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612 and has determined that 
this rule does not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.

Environment

    The Coast Guard has considered the environmental impacts of this 
rule and concluded that, under paragraph 2.B.2.e.34(h) of COMDTINST 
16475.1B, (as revised by 61 FR 13563, March 27, 1996) this is a 
regulation issued in conjunction with a regatta or marine parade and is 
categorically excluded from further environmental documentation.

List of Subjects in 33 CFR Part 100

    Marine safety, Navigation (water), Reporting and recordkeeping 
requirements, Waterways.

Final Regulation

    For the reasons set out in the preamble, the Coast Guard proposes 
to temporarily amend 33 CFR Part 100 as follows:
    1. The authority citation for Part 100 continues to read as 
follows:

    Authority: 33 U.S.C. 1233; 49 CFR 1.46 and 33 CFR 100.35.

    2. A temporary section, 100.T01-017, is added to read as follows:

Sec. 100.T01-017  Quonset Open House, North Kingstown, RI

    (a) Regulated area. The regulated area includes all waters of the 
West Passage of Rhode Island Sound within the following points (NAD 
83):

Latitude                          Longitude                             
                                                                        
41 deg.35'10'' N                  071 deg.24'29'' W                     
41 deg.34'54'' N                  071 deg.23'29'' W                     
41 deg.35'07'' N                  071 deg.23'29'' W                     
41 deg.36'42'' N                  071 deg.24'29'' W                     
                                                                        

    (b) Special local regulations. (1) The Coast Guard patrol commander 
may delay, modify, or cancel the event as conditions or circumstances 
require.
    (2) No person or vessel may enter, transit, or remain in the 
regulated area unless participating in the event or unless authorized 
by the Coast Guard patrol commander.
    (3) Vessels encountering emergencies which require transit through 
the regulated area should contact the Coast Guard patrol commander on 
VHF Channel 16. In the event of an emergency, the Coast Guard patrol 
commander may authorize a vessel to transit through the regulated area 
with a Coast Guard designated escort.
    (4) All persons and vessels shall comply with the instructions of 
the Coast Guard on-scene patrol commander. On-scene patrol personnel 
may include commissioned, warrant, and petty officers of the U.S. Coast 
Guard. Upon hearing five or more short blasts from a U.S. Coast Guard 
vessel, the operator of a vessel shall proceed as directed. Members of 
the Coast Guard Auxiliary may also be present to inform vessel 
operators of this regulation and other applicable laws.
    (c) Effective period. This section is effective on June 1 and 2, 
1996, from 9 a.m. to 4:30 p.m.

    Dated: May 10, 1996.
J.L. Linnon,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 96-13162 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-13157 Amendment to Class D and Class E Airspace; New England Region; Correction
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26094-26095]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13157]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-ANE-60]

Amendment to Class D and Class E Airspace; New England Region; 
Correction

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule, correction.

-----------------------------------------------------------------------

SUMMARY: This action corrects an error in the description of the Class 
E airspace areas at Beverly, MA (BVY), contained in final rule 
published in the Federal Register on February 15, 1996 (61 FR 5935), 
Airspace Docket No. 95-ANE-60. That final rule modified certain Class D 
and Class E airspace areas in the New England Region.

EFFECTIVE DATE: May 24, 1996.

FOR FURTHER INFORMATION CONTACT:
Raymond Duda, Operations Branch, ANE-530.3, Federal Aviation 
Administration, 12 New England Executive Park, Burlington, MA 01803-
5299; telephone (617) 238-7533; fax (617) 238-7596.

SUPPLEMENTARY INFORMATION:

History

    Federal Register Document 96-3492, Airspace Docket 95-ANE-60, 
published on February 15, 1996, (61 FR 5935) reduced the lateral limits 
of the Class D airspace areas at Beverly, MA (BVY); Bedford, MA (BED); 
Danbury, CT (DXR); Norwood, MA (OWD); Lebanon, NH (LEB); and Nashua, 
(ASH); and, as a consequence to those changes, made the necessary 
changes to the associated Class E airspace areas at Beverly (BVY), 
Lebanon (LEB), and Nashua (ASH). The description of the Class E 
airspace area at BVY, however, did not contain a geographic position 
for the Topfield non-directional beacon (NDB). This action corrects 
that error by including in the airspace description for the Class E 
airspace area at BVY, the geographic position of the Topfield NDB. 
Correction to the Final Rule.
    Accordingly, pursuant to the authority delegated to me, the 
description of class E airspace area at Beverly, MA, as published in 
the Federal Register on February 15, 1996 (61 FR 5935), Federal 
Register Document 96-3492; page 5937, column 1), and the description in 
FAA Order 7400.9C, dated August 17, 1995, and effective September 16, 
1995, which is incorporated by reference in 14 CFR 71.1, is corrected 
to read as follows:

Sec. 71.1  [Corrected]

Subpart E--Class E Airspace

* * * * *

[[Page 26095]]

ANE MA E4 Beverly, MA [Corrected]

Beverly Municipal Airport, MA
    (lat. 42 deg.53'03'' N, long. 70 deg.54'59'' W)
Topsfield NDB
    (lat. 42 deg.37'10'' N, long. 70 deg.57'25'' W)

    That airpace extending upward from the surface within 3.2 miles 
on each side of the Topsfield NDB 317 deg. bearing extending from a 
4.1-mile radius of Beverly Municipal Airport to 7 miles northwest of 
the Topsfiled NDB. This Class E airspace area is effective during 
the specific dates and times established in advance by a Notice to 
Airmen. The effective dates and times will thereafter be 
continuously published in the Airport/Facility Directory.
* * * * *
    Issued in Burlington, MA on May 17, 1996.
David J. Hurley,
Manager, Air Traffic Division, New England Region.
[FR Doc. 96-13157 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-13156 Revocation of Restricted Area R-5202, Gardiner's Island, NY
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Page 26095]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13156]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 73

[Airspace Docket No. 95-AEA-8]

Revocation of Restricted Area R-5202, Gardiner's Island, NY

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action revokes Restricted Area R-5202, Gardiner's Island, 
NY. The U. S. Navy has determined that this restricted airspace area is 
no longer necessary to support Department of Defense missions.

EFFECTIVE DATE: 0901 UTC, August 15, 1996.

FOR FURTHER INFORMATION CONTACT: Pete Magarelli, Airspace and Rules 
Division, ATA-400, Office of Air Traffic Airspace Management, Federal 
Aviation Administration, 800 Independence Avenue, SW., Washington, DC 
20591; telephone: (202) 267-3075.

SUPPLEMENTARY INFORMATION:

The Rule

    This amendment to part 73 of the Federal Aviation Regulations 
revokes Restricted Area R-5202, Gardiner's Island, NY. The U.S. Navy 
has determined that the restricted area airspace is no longer required 
to support Department of Defense missions. I find that notice and 
public procedure under 5 U.S.C. 553(b) are unnecessary because this 
action is a minor technical amendment in which the public would not be 
particularly interested. Section 73.52 of part 73 of the Federal 
Aviation Regulations was republished in FAA Order 7400.8C dated June 
29, 1995.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. Since this is a routine matter that 
will only affect air traffic procedures and air navigation, it is 
certified that this rule will not have a significant economic impact on 
a substantial number of small entities under the criteria of the 
Regulatory Flexibility Act.

Environmental Review

    This action is not subject to environmental assessments and 
procedures under FAA Order 1050.1D, ``Policies and Procedures for 
Considering Environmental Impacts,'' and the National Environmental 
Policy Act.

List of Subjects in 14 CFR Part 73

    Airspace, Navigation (air).

Adoption of the Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration amends 14 CFR part 73 as follows:

PART 73--[AMENDED]

    1. The authority citation for part 73 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 73.52  [Amended]

    2. Section 73.52 is amended as follows:

R-5202  Gardiner's Island, NY [Removed]

    Issued in Washington, DC, on May 13, 1996.
Harold W. Becker,
Acting Program Director for Air Traffic, Airspace Management.
[FR Doc. 96-13156 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-13154 Ocean Salmon Fisheries Off the Coasts of Washington, Oregon, and California; Cape Arago, OR, to Oregon-California Border
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Page 26125]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13154]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 661

[Docket No. 960126016-6121-04; I.D. 051796A]

Ocean Salmon Fisheries Off the Coasts of Washington, Oregon, and 
California; Cape Arago, OR, to Oregon-California Border

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Inseason adjustment.

-----------------------------------------------------------------------

SUMMARY: NMFS announces that the commercial salmon fishery in the area 
from Cape Arago, OR, to the Oregon-California border was opened 7 days 
a week effective midnight, May 18, 1996. This adjustment is intended to 
provide additional fishing opportunity to commercial fishermen.

DATES: Effective 2400 hours local time, May 18, 1996, through 2400 
hours local time, June 30, 1996. Comments will be accepted through June 
7, 1996.

ADDRESSES: Comments may be mailed to William Stelle, Jr., Director, 
Northwest Region, National Marine Fisheries Service, NOAA, 7600 Sand 
Point Way NE., BIN C15700-Bldg. 1, Seattle, WA 98115-0070. Information 
relevant to this notice has been compiled in aggregate form and is 
available for public review during business hours at the office of the 
Director, Northwest Region, NMFS (Regional Director).

FOR FURTHER INFORMATION CONTACT: William L. Robinson, 206-526-6140.

SUPPLEMENTARY INFORMATION: In the annual management measures for ocean 
salmon fisheries (61 FR 20175, May 6, 1996), NMFS announced that the 
1996 commercial fishery in the area between Cape Arago, OR, and the 
Oregon-California border would open on May 1 and fishing would follow a 
cycle of 4 days open and 3 days closed. The fishery would close the 
earlier of June 30 or attainment of the 5,300-chinook salmon quota. The 
open/closure cycle could be modified inseason as necessary to manage 
the fishery.
    The best available information on May 15 indicated that the 
commercial catch and effort rates were low during the first two open 
periods (May 1-4 and May 8-11), with catches totaling less than 200 
chinook salmon. The preseason objective for the open/closure cycle was 
to monitor catch levels. Opening the fishing season to 7 days per week 
would provide additional fishing opportunity to commercial fishermen 
without exceeding the share allocated to the commercial fishery in this 
area. Modification of the fishing season is authorized by the annual 
management measures and the regulations at 50 CFR 661.21(b)(1)(i). All 
other restrictions that apply to this fishery remain in effect as 
announced in the annual management measures.
    The Regional Director consulted with representatives of the Pacific 
Fishery Management Council and the Oregon Department of Fish and 
Wildlife regarding this adjustment. The State of Oregon will manage the 
commercial fishery in state waters adjacent to this area of the 
exclusive economic zone in accordance with this Federal action. As 
provided by the inseason notice procedures of 50 CFR 661.23, actual 
notice to fishermen of this action was given prior to midnight, May 18, 
1996, by telephone hotline number 206-526-6667 or 800-662-9825 and by 
U.S. Coast Guard Notice to Mariners broadcasts on Channel 16 VHF-FM and 
2182 kHz. Because of the need for immediate action to provide 
commercial fishermen with additional fishing opportunity, NMFS has 
determined that good cause exists for this notice to be issued without 
affording a prior opportunity for public comment.

Classification

    This action is authorized by 50 CFR 661.21 and 661.23 and is exempt 
from review under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: May 20, 1996.
Richard H. Schaefer,
Director, Office of Fisheries Conservation and Management, National 
Marine Services Division.
[FR Doc. 96-13154 Filed 5-23-96; 8:45 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-13148 Gifts From Foreign Governments; Removal of Part
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Page 26102]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13148]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Office of the Secretary

32 CFR Part 95

[DoD Directive 1005.13]

Gifts From Foreign Governments; Removal of Part

AGENCY: Department of Defense.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document removes the Department of Defense's rule 
concerning gifts from foreign governments. The part has served the 
purpose for which it was intended for the Code of Federal Regulations, 
and is no longer necessary.

EFFECTIVE DATE: May 24, 1996.

FOR FURTHER INFORMATION CONTACT:
Mr. R. Kennedy, 703-697-1142.

SUPPLEMENTARY INFORMATION: Paper copies of DoD Directive 1005.13 are 
available, at cost, from the National Technical Information Service, 
5285 Port Royal Road, Springfield, VA 22161. The Directive is also 
available on the World-Wide Web at URL address: http:\\www.dtic.mil/
adm.

List of Subjects in 32 CFR Part 95

    Foreign relations; Government employees; Government property.

PART 95--[REMOVED]

    Accordingly, by the authority of 10 U.S.C. 301, 32 CFR Part 95 is 
removed.

    Dated: May 21, 1996.
L.M. Bynum,
Alternate OSD Federal Register Liaison Officer, Department of Defense.
[FR Doc. 96-13148 Filed 5-23-96; 8:45 am]
BILLING CODE 5000-04-M

Complete official Federal Register PDF

FR Doc. 96-13107 Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26095-26096]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13107]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

15 CFR Part 24

RIN 0605-AA10

Uniform Administrative Requirements for Grants and Cooperative 
Agreements to State and Local Governments

AGENCY: Department of Commerce.

ACTION: Announcement regarding Grant and Cooperative Agreement Cost 
Principles for State, Local and Indian Tribal Governments.

-----------------------------------------------------------------------

SUMMARY: The Department of Commerce (Department) is announcing the 
applicability of the revised Office of Management and Budget (OMB) 
Circular A-87, ``Cost Principles for State, Local and Indian Tribal 
Governments,'' (60 FR 26484, May 17, 1995). This Circular establishes 
principles for determining the allowable costs incurred by State, 
local, and federally-recognized Indian tribal governments (governmental 
units) under grants, cost reimbursement contracts, and other agreements 
with the Federal Government.

DATES: This announcement is effective May 24, 1996.

FOR FURTHER INFORMATION CONTACT:
John J. Phelan, III, Director, Office of Executive Assistance 
Management, Room 6020, U.S. Department of Commerce, 14th Street and 
Constitution Avenue NW., Washington, DC 20230. Telephone Number 202-
482-4115.

SUPPLEMENTARY INFORMATION: On March 11, 1988, the Department joined 
other agencies in the Federal government in publishing in the Federal 
Register a final rule, ``Uniform Administrative Requirements for Grants 
and Cooperative Agreements to State and Local Governments,'' (53 FR 
8048) which was codified at 15 CFR Part 24 for the Department. Part 
24.22 established OMB Circular A-87 as the cost principles used by the 
Department for determining allowable costs of State and local 
governments under grants and cooperative agreements with the 
Department. In addition, recipients of the Department's financial 
assistance awards are given actual notice of which cost principles 
apply to the award on the face page of the award document, Commerce 
Department Form CD-450, ``Financial Assistance Award.''
    On May 17, 1995 the Office of Management and Budget (OMB) published 
a Final Revision to OMB Circular A-87, ``Cost Principles for State, 
Local and Indian Tribal Governments,'' and directed agencies to

[[Page 26096]]

issue codified regulations to implement the provisions of the Circular. 
This announcement notifies the public that the provisions of OMB 
Circular A-87 as published in the Federal Register on May 17, 1995 (60 
FR 26484) are applicable to 15 CFR Part 24.22.

Executive Orders 12866 and 12875

    This announcement has been determined to be ``not significant'' for 
purposes of Executive Order 12866, ``Regulatory Planning and Review.'' 
In addition, it has been determined that, consistent with the 
requirements of Executive Order 12875, ``Enhancing Intergovernmental 
Partnership,'' this announcement will not impose any unfunded mandates 
upon State, local, and tribal governments.

Administrative Procedures Act and Regulatory Flexibility Act

    Because notice and comment, and delayed effective date are not 
required under 5 U.S.C. 553, or any other law, for this announcement 
relating to public property, loans, grants, benefits, or contracts (5 
USC 553(a)), a Regulatory Flexibility Analysis is not required and has 
not been prepared for this announcement. As stated above, this 
announcement is based on the revised OMB Circular A-87 that was 
developed by an interagency task force and received extensive public 
comment. OMB has stipulated that Federal agencies responsible for 
administering programs that involve cost reimbursement contracts, 
grants, and other agreements with governmental units shall issue 
codified regulations to implement the provisions of OMB Circular A-87 
and its attachments.

Executive Order 12612 (Federalism Assessment)

    This action has been reviewed in accordance with the principles and 
criteria contained in Executive Order 12612. It has been determined 
that this proposal does not have sufficient Federalism implications to 
warrant a full Federalism Assessment under the principles and criteria 
contained in Executive Order 12612.

Paperwork Reduction Act

    This announcement does not contain any information collection 
requirements under the Paperwork Reduction Act.

Catalog of Federal Domestic Assistance

    This announcement affects all of the grant and cooperative 
agreement programs administered by DOC under which State, local, and 
Indian tribal governments may participate.

List of Subjects in 15 CFR Part 24

    Accounting, Grant programs, Grant administration, Insurance 
Reporting and recordkeeping requirements.
Sonya G. Stewart,
Director for Executive Budgeting and Assistance Management.
[FR Doc. 96-13107 Filed 5-23-96; 8:45 am]
BILLING CODE 3510-FA-M

Complete official Federal Register PDF

FR Doc. 96-13100 Vessel Traffic Services (VTS)
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26120-26121]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13100]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 80

[WT Docket No. 94-153; FCC 96-202]

Vessel Traffic Services (VTS)

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Commission has added Prince William Sound to the United 
States Coast Guard (Coast Guard) designated radio protection areas for 
mandatory VTS and establish marine VHF Channel 11 as the VTS frequency 
for Prince William Sound. This action is in response to a request from 
the Coast Guard. The designation of Prince William Sound as a VTS area 
will allow the Coast Guard to manage vessel traffic in a more efficient 
manner.

EFFECTIVE DATE: June 24, 1996.

FOR FURTHER INFORMATION CONTACT: James Shaffer, (202) 418-0680, Private 
Radio Bureau.

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's Report 
and Order, FCC 96-202, adopted May 2, 1996, and released May 9, 1996. 
The full text of this Report and Order is available for inspection and 
copying during normal business hours in the FCC Reference Center, Room 
239, 1919 M Street, N.W., Washington, D.C. The complete text may be 
purchased from the Commission's copy contractor, International 
Transcription Service, Inc., 2100 M Street, Suite 140, Washington, D.C. 
20037, telephone (202) 857-3800.

Summary of Report and Order

    1. The Coast Guard filed a petition (RM-8199), Public Notice No. 
1932, requesting that the Commission amend Part 80 of the Rules, 47 CFR 
Part 80, to add Prince William Sound to the Coast Guard designated 
radio protection areas for mandatory VTS and establish marine VHF 
Channel 11 (156.550 MHz) as the VTS frequency for Prince William Sound.
    2. As a result of the Oil Pollution Act of 1990, Public Law 101-
380, 104 Stat. 484, the Coast Guard plans to implement a mandatory 
Automated Dependent Surveillance (ADS) system for cargo ships, e.g. oil 
tankers, that operate in Prince William Sound. The ADS will operate as 
part of the proposed VTS system and is scheduled to begin operation in 
July 1994. An ADS system works as follows: the vessel determines its 
position using a highly accurate differential GPS receiver and 
automatically transmits its position, identification and the time of 
the position to the Coast Guard using digital selective calling (DSC) 
techniques on VHF marine Channel 70 (156.525 MHz). The Coast Guard 
needs Channel 11 to supplement Channel 70 ADS use and for voice VTS 
communications in support of vessel traffic control operations.
    3. Designating Prince William Sound as a VTS area will allow the 
Coast Guard to manage vessel traffic in that area more efficiently and 
protect the marine environment by preventing vessel collisions and 
groundings. Therefore, we are adding Prince William Sound to the 
Commission's list of designated radio protection areas for VTS systems 
specified in Section 80.383. The radio protection area will be defined 
as ``The rectangle between North latitudes 61 degrees 17 minutes and 59 
degrees 22 minutes and West longitudes 149 degrees 39 minutes and 145 
degrees 36 minutes.''
    4. Additionally, we will permit private coast stations currently 
authorized to operate on Channel 11 within the Prince William Sound VTS 
area to continue operation until the end of their current license terms 
on a noninterference basis. The staff will help affected licensees find 
suitable alternative channels. No fee will be charged for affected 
stations that apply for modification for an alternative channel before 
their next renewals.

List of Subjects in 47 CFR Part 80

    Communications equipment, Marine safety.

Federal Communications Commission.
William F. Caton,
Acting Secretary.

Rules Changes

    Title 47 of the Code of Federal Regulations, Part 80, is amended as 
follows:

PART 80--STATIONS IN THE MARITIME SERVICES

    1. The authority citation for Part 80 continues to read as follows:

    Authority: Secs. 4, 303, 48 Stat. 1066, 1082, as amended; 47 
U.S.C. 154, 303, unless otherwise noted. Interpret or apply 48 Stat. 
1064-1068, 1081-1105, as amended; 47 U.S.C. 151-155, 301-609; 3 UST 
3450, 3 UST 4726, 12 UST 2377.

    2. Section 80.383 is amended by revising the entry for 156.550 MHz 
in the table in paragraph (a), removing the final word ``and'' in 
paragraph (b)(4), removing the final ``.'' and adding in its place ``; 
and'' in paragraph (b)(5), and adding a new paragraph (b)(6) to read as 
follows:

Sec. 80.383  Vessel Traffic Services (VTS) system frequencies.

* * * * *
    (a) * * *

                   Vessel Traffic Control Frequencies                   
------------------------------------------------------------------------
         Carrier frequencies (MHz)                Geographic areas      
------------------------------------------------------------------------
                                                                        
                  *        *        *        *        *                 
156.550...................................   New York, New Orleans,\1\  
                                             Houston, Prince William    
                                             Sound.\3\                  
                                                                        
                  *        *        *        *        *                 
------------------------------------------------------------------------

[[Page 26121]]

    \1\ Until further notice, this frequency is available for use as 
permitted by Sec. 80.373(f), notwithstanding the provisions of 
footnote 3, that are applicable to the VTS system. Availability is a 
result of the closure of the VTS system for the port area of New 
Orleans. If the United States Coast Guard re-establishes this 
system, the Commission may require operations pursuant to such 
conditional licenses for this frequency to cease, or may choose not 
to renew such conditional licenses. All licenses for this frequency 
will be expressly conditioned upon the continued availability of the 
frequency for non-VTS use.
* * * * *
    \3\ Private coast station licenses for the use of this frequency 
in this area will expire at the end of the current license term or 
five years after the adopted date of the final rule, whichever comes 
first. Continued use until expiration must be on a noninterference 
basis to Coast Guard VTS communications.

    (b) * * *
    (6) Prince William Sound. The rectangle between North latitudes 61 
degrees 17 minutes and 59 degrees 22 minutes and West longitudes 149 
degrees 39 minutes and 145 degrees 36 minutes.
* * * * *
[FR Doc. 96-13100 Filed 5-23-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-13090 Albemarle Sound, Pamlico Sound, and adjacent waters, North Carolina; danger zones/restricted areas for naval aircraft operations.
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26106-26107]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13090]

=======================================================================
-----------------------------------------------------------------------

[[Page 26107]]

DEPARTMENT OF DEFENSE

Department of the Army
Corps of Engineers

33 CFR Part 334

Albemarle Sound, Pamlico Sound, and adjacent waters, North 
Carolina; danger zones/restricted areas for naval aircraft operations.

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Correction to final rule.

-----------------------------------------------------------------------

SUMMARY: This document contains a correction to the final rule which 
was published Tuesday, February 27, 1996 (61 FR 7214). The effective 
date was February 27, 1996. This rule re-established a danger zone as a 
restricted area in the waters off of Harvey Point, Perquimans County, 
North Carolina. This is an editorial correction and will not affect the 
restrictions placed on entry into the area.

DATES: Effective May 24, 1996.

ADDRESS: HQUSACE, CECW-OR, Washington, D.C. 20314-1000.

FOR FURTHER INFORMATION CONTACT:
Ms. Angie Yelverton of the Corps Wilmington District at (910) 251-4480, 
or Mr. Ralph Eppard, Regulatory Branch, CECW-OR at (202) 761-1783.

SUPPLEMENTARY INFORMATION: Pursuant to its authorities in Section 7 of 
the Rivers and Harbors Act of 1917 (40 Stat. 266; 33 U.S.C. 1) and 
Chapter XIX of the Army Appropriations Act of 1919 (40 Stat. 892; 33 
U.S.C. 3), the Corps promulgated a regulation under 33 CFR 334.412 
which re-established an area that was previously a danger zone, as a 
restricted area in the waters off of Harvey Point, Albemarle Sound, 
North Carolina.

Need for Correction

    As published, the final rules in Sec. 334.412(a) contain an 
incorrect bearing listed as ``southwesterly to latitude 36 deg. 
04'18'', which should have read ``northwesterly to latitude 36 deg. 
04'18''''

Correction of Publication

    Accordingly, the publication on February 27, 1996, of the final 
rule, which was the subject of 61 FR 7214-7215, is corrected as 
follows:

Sec. 334.412  [Corrected]

    On page 7215, in Sec. 334.412 in the second column, second line, 
remove ``southwesterly'' and replace it with ''northwesterly''.

    Dated: May 6, 1996.
    Approved;
Stanley G. Genega,
Major General, USA, Director of Civil Works.
[FR Doc. 96-13090 Filed 5-23-96; 8:45 am]
BILLING CODE 3710-92-M

Complete official Federal Register PDF

FR Doc. 96-13085 Nectarines and Peaches Grown in California; Relaxation of Quality Requirements for Fresh Nectarines and Peaches
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Page 26073]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13085]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 102 / Friday, May 24, 1996 / Rules 
and Regulations

[[Page 26073]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Parts 916 and 917

[Docket No. FV95-916-5C]

Nectarines and Peaches Grown in California; Relaxation of Quality 
Requirements for Fresh Nectarines and Peaches

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This document contains a correction to the final rule 
published on May 1, 1996 concerning nectarines and peaches grown in 
California.

EFFECTIVE DATES: May 2, 1996.

FOR FURTHER INFORMATION CONTACT: Kenneth Johnson, Marketing Specialist, 
Marketing Order Administration Branch, Fruit and Vegetable Division, 
AMS, USDA, P.O. Box 96456, Room 2523-S, Washington, DC 20090-6456; 
telephone: (202) 720-2861; or Terry Vawter, Marketing Specialist, 
California Marketing Field Office, Marketing Order Administration 
Branch, Fruit and Vegetable Division, AMS, USDA, 2202 Monterey Street, 
Suite 102B, Fresno, California, 93721; telephone: (209) 487-5901.

SUPPLEMENTARY INFORMATION:

Background

    This rule establishes a ``CA Utility'' quality requirement, based 
on minimum quality standards established under the California 
Agriculture Code, with a limitation on the amount of fruit meeting U.S. 
No. 1 or higher grade requirements that may be contained in the utility 
pack. This final rule also requires that containers of nectarines and 
peaches meeting the ``CA Utility'' quality requirement be clearly 
marked ``CA Utility.''

Need for Correction

    In the final rule, FR Doc. 96-10758, published May 1, 1996, the 
last sentence in section (a)(1)(ii) was inadvertently omitted, 
therefore, the existing language may prove to be misleading and is in 
need of clarification.

Correction of Publication

    Accordingly, in FR Doc. 96-10758, page 19164, second column section 
916.356, paragraph (a)(1)(ii) is corrected to read as follows:

Sec. 916.356  [Corrected]

    (a) * * *
    (ii) Free from serious damage due to skin breaks, cuts, growth 
cracks, bruises, or other causes. Damage to any nectarine is serious 
when it causes a waste of 10 percent or more, by volume, of the 
individual nectarine.
* * * * *
    Dated: May 20, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-13085 Filed 5-23-96; 8:45 am]
BILLING CODE 3410-02-M

Complete official Federal Register PDF

FR Doc. 96-13079 Delegations of Authority Concerning Discrimination or Reprisal
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Page 26107]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13079]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF VETERANS AFFAIRS

38 CFR Part 2

RIN 2900-AI12

Delegations of Authority Concerning Discrimination or Reprisal

AGENCY: Department of Veterans Affairs.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document sets forth delegations of authority to the 
General Counsel and certain subordinates to make the final decision on 
a complaint of discrimination on grounds of race, color, religion, sex, 
national origin, age, disability, or reprisal brought by an employee of 
the Department of Veterans Affairs or an applicant for employment. The 
effect of this action is to clarify and expand CFR material to specify 
all delegations of authority already made concerning this subject 
matter.

EFFECTIVE DATE: May 24, 1996.

FOR FURTHER INFORMATION CONTACT: Neal C. Lawson, Assistant General 
Counsel (024), Office of General Counsel, Department of Veterans 
Affairs, 810 Vermont Avenue, NW., Washington, DC 20420, (202) 273-6384.

SUPPLEMENTARY INFORMATION: This final rule consists of delegations of 
authority and, therefore, is not subject to the notice and comment and 
effective date provisions of 5 U.S.C. 553.
    The Secretary hereby certifies that this rule will not have a 
significant economic impact on a substantial number of small entities 
as they are defined in the Regulatory Flexibility Act, 5 U.S.C. 601-
612. This rule merely sets forth delegations of authority.
    There is no Catalog of Federal Domestic Assistance program number 
for this regulation.

List of Subjects in 38 CFR Part 2

    Authority delegations (government agencies).

    Approved: May 17, 1996.
Jesse Brown,
Secretary of Veterans Affairs.

    For the reasons set out in the preamble, 38 CFR part 2 is amended 
as set forth below:

PART 2--DELEGATIONS OF AUTHORITY

    1. The authority citation for part 2 is revised to read as follows:

    Authority: 5 U.S.C. 302; 38 U.S.C. 501,512; 44 U.S.C. 3702.

    2. In Sec. 2.6, paragraph (e)(6) is revised to read as follows:

Sec. 2.6   Secretary's delegations of authority to certain officials 
(38 U.S.C. 512).

* * * * *
    (e) * * *
    (6) Authority is delegated to the General Counsel and Deputy 
General Counsel and to the Assistant General Counsel and Deputy 
Assistant General Counsel of Professional Staff Group IV to make the 
final decision on a complaint of discrimination on grounds of race, 
color, religion, sex, national origin, age, disability, or reprisal 
brought by an employee of the Department of Veterans Affairs or an 
applicant for employment.

(Authority: 38 U.S.C. 512)
* * * * *
[FR Doc. 96-13079 Filed 5-23-96; 8:45 am]
BILLING CODE 8320-01-P

Complete official Federal Register PDF

FR Doc. 96-13047 State Safety Participation Regulations; Federal Regulatory Reform
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26124-26125]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13047]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration

49 CFR Part 212

[FRA Docket No. RSSP-3, Notice No. 5]
RIN AB08

State Safety Participation Regulations; Federal Regulatory Reform

AGENCY: Federal Railroad Administration (FRA), Department of 
Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In connection with the President's Regulatory Reform 
Initiative, the FRA has reviewed all of its existing regulations. This 
review identified a portion of the regulation governing state 
participation in the Federal Rail Safety Program that can be removed. 
FRA expects that this final rule will reduce the administrative burden 
to government and industry, reduce government printing costs, and 
provide a more concise and useful Title 49, Code of Federal 
Regulations.

EFFECTIVE DATE: The rule becomes effective June 24, 1996.

FOR FURTHER INFORMATION CONTACT: Cynthia Walters, Trial Attorney, 
Office of Chief Counsel, FRA, 400 Seventh Street, S.W., Washington, 
D.C. 20590, (202) 366-0621 or Mike Calhoun, Transportation Safety 
Program Specialist, Region 5 Hurst Regional Office, FRA, 8701 Bedford-
Euless Rd. Suite 425, Hurst, TX 76053, (817) 284-8142.

SUPPLEMENTARY INFORMATION: On March 4, 1995, the President issued a 
memorandum directing the heads of federal departments and agencies to 
conduct a page-by-page review of all agency regulations now in force 
and eliminate or revise those that are outdated or otherwise in need of 
reform. FRA has conducted a page-by-page review of all of its 
regulations and identified the following portion of FRA's state 
participation regulation, 49 CFR Part 212, Subpart D--Grants in Aid, 
and corresponding appendices for removal:
    FRA's Grants-in-Aid Program, 49 CFR Part 212, Subpart D, was 
established as part of the State Participation program by the Federal 
Railroad Safety Act of 1970. The State Participation Program allows 
states to conduct investigative and surveillance activities to enforce 
federal railroad safety regulations in conjunction with federal 
inspection efforts. The Grants in Aid program was intended to provide a 
transition to a uniform pattern of rail safety regulation and to 
provide a continuing state role in rail safety regulation. As 
originally conceived, the program allowed participating states to 
obtain federal reimbursement of up to 50 percent of a state's allowable 
cost.
    Once the goal of uniform rail safety regulation was realized, 
Congress elected to eliminate funding. Specifically, FRA's federal 
funding share of the program declined from the maximum of 50 percent in 
fiscal year 1985 to 39 percent in fiscal year 1986, 24 percent in 
fiscal year 1987, and 16 percent in fiscal year 1988, due to dwindling 
federal resources. There has been no federal funding available for the 
Grants-in-Aid program, since fiscal year 1989. Despite the lack of 
federal funds for the program, the State Participation has actually 
grown. In 1989, there were 110 participating state inspectors and 
currently there are 137 state inspectors participating in the program. 
In general, states have continued to participate as active partners in 
the program.
    Appendices A, B, and C are being removed, as well, because they 
were previously used to determine the levels of inspection effort and 
reimbursement for Track Safety Standards, Freight Car Safety Standards, 
and Operating Practices respectively.

Regulatory Impact

Executive Order 12866 and DOT Regulatory Policies

    This final rule has been evaluated in accordance with existing 
regulatory policies. The regulatory document is considered to be a 
nonsignificant regulatory action under section 3(f) of Executive Order 
12866 and does not require an assessment of costs and benefits under 
section 6(a)(3) of that Order. It has not been reviewed by the Office 
of Management and Budget under that Order. This rulemaking has been 
reviewed under DOT Regulatory Policies and Procedures [44 FR 11034, 
February 26, 1979] and found to be a nonsignificant rule.
    In its regulatory analysis, FRA has determined that this rulemaking 
presents no substantive issue which it could reasonably expect would 
produce meaningful public comment since it is merely removing, pursuant 
to Presidential directive, obsolete regulations, retention of which 
could serve no useful purpose. Accordingly, pursuant to 5 U.S.C. 553(c) 
and (d), the Administrative Procedure Act, FRA finds good cause exists 
to publish this as a final rule without opportunity for public comment.

Federalism

    FRA has analyzed this rulemaking in accordance with the principles 
and

[[Page 26125]]

criteria contained in Executive Order 12612 and has determined that 
this rule does not have sufficient implications for federalism to 
warrant the preparation of a Federalism Assessment.

Regulatory Flexibility Act

    The Regulatory Flexibility Act of 1980 (5 U.S.C. 601 et seq.) 
requires a review of rules to assess their impact on small entities. In 
reviewing the economic impact of the rule, FRA concluded that it will 
not have any measurable impact on small entities. There are no direct 
or indirect economic impacts for small units of government, businesses, 
or other organizations. Therefore, it is certified that this rule will 
not have a significant economic impact on a substantial number of small 
entities under the provisions of the Regulatory Flexibility Act.

Paperwork Reduction Act

    This rulemaking contains no reporting requirements that are subject 
to OMB approval under 5 CFR Part 1320, pursuant to the Paperwork 
Reduction Act of 1980 (44 U.S.C. 3501 et seq.)

Environmental Assessment

    This final rule meets the criteria that establish this as a non-
major action for environmental purposes.

List of Subjects in 49 CFR Part 212

    Railroad safety, State participation--Grants in aid and 
corresponding appendices.

    Accordingly, for the reasons set forth above, and under the 
authority of 49 U.S.C. 20103, 20105, 20106, and 20113 (formerly secs. 
202, 205, 206, and 208, of the Federal Railroad Safety Act of 1970, and 
amended (45 U.S.C. 431, 434, 435, and 436); and 49 CFR 1.49, FRA is 
taking the following action:

PART 212--[AMENDED]

    Part 212, is amended by deleting Sec. 212.301 Grant authority; 
Sec. 212.303 Annual funding process; Sec. 212.305 Reports; Sec. 212.307 
Maximum reimbursement levels; and Appendices A, B, and C in their 
entirety.

    Issued in Washington, D.C. on May 16, 1996.
Jolene M. Molitoris,
Administrator, Federal Railroad Administration.
[FR Doc. 96-13047 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-06-P

Complete official Federal Register PDF

FR Doc. 96-13046 Large Multiple-tube Fireworks Devices; Affirmation of Final Rule
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Page 26096]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13046]

=======================================================================
-----------------------------------------------------------------------

CONSUMER PRODUCT SAFETY COMMISSION

16 CFR Parts 1500 and 1507

Large Multiple-tube Fireworks Devices; Affirmation of Final Rule

AGENCY: Consumer Product Safety Commission.

ACTION: Affirmation of final rule.

-----------------------------------------------------------------------

SUMMARY: The Commission announces that it has received no objections to 
its final rule amending its fireworks regulations under the Federal 
Hazardous Substances Act that was published on March 26, 1996 (61 FR 
13084). Accordingly, the rule will go into effect on March 26, 1997, as 
originally provided. This final rule will require that large multiple-
tube fireworks devices that have any tube with an inner diameter of 1.5 
inches (3.8 cm) or greater pass a performance test for stability.

EFFECTIVE DATE: The rule published March 26, 1996 (61 FR 13084) is 
effective March 26, 1997.

FOR FURTHER INFORMATION CONTACT: Samuel B. Hall, Office of Compliance, 
Consumer Product Safety Commission, Washington, DC 20207-0001; 
telephone (301) 504-0400, ext. 1371.

SUPPLEMENTARY INFORMATION: On March 26, 1996, the Commission issued a 
final rule amending its fireworks regulations under the Federal 
Hazardous Substances Act. 61 FR 13084, corrected 61 FR 18245 (April 25, 
1996). This final rule will require that large multiple-tube fireworks 
devices that have any tube with an inner diameter of 1.5 inches (3.8 
cm) or greater pass a performance test for stability. Under the test, 
these devices may not tip over when inclined at an angle of 60 degrees 
from the horizontal. This requirement is intended to reduce the risk of 
injury posed when these fireworks devices tip over during firing. If 
they tip over, subsequent tubes may discharge in the direction of 
spectators or others in the vicinity.
    A proceeding to classify a substance as a banned hazardous 
substance under section 2(q)(1) of the FHSA is governed by sections 
3(f)-(i) of the FHSA, and by sections 701(e)-(g) of the Federal Food, 
Drug, and Cosmetic Act (``FDCA''), 21 U.S.C. 371(e)-(g). See 15 U.S.C. 
1261(q)(2). These procedures provide that once the Commission issues a 
final rule, persons who would be adversely affected by the rule have 30 
days in which to file objections with the Commission stating the 
grounds therefor, and to request a public hearing on those objections. 
21 U.S.C. 371(e). This period for objections expired on April 25, 1996.
    The Commission is required to publish a notice in the Federal 
Register specifying any parts of the regulation that have been stayed 
by the filing of proper objections or, if no objections have been 
filed, stating that fact. By this notice, the Commission states that no 
objections to the final rule were filed in this proceeding. 
Accordingly, the rule will go into effect on March 26, 1997, as 
originally provided. The rule will apply to the subject multiple-tube 
fireworks devices that first enter interstate commerce or are imported 
on or after the effective date.

    Dated: May 20, 1996.
Sadye E. Dunn,
Secretary, Consumer Product Safety Commission.
[FR Doc. 96-13046 Filed 5-23-96; 8:45 am]
BILLING CODE 6355-01-P

Complete official Federal Register PDF

FR Doc. 96-13021 Maleic Hydrazide, Oryzalin, Hexazinone, Streptomycin; Tolerance Actions
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26118-26120]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13021]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 180

[OPP-300405A; FRL-4996-1]
RIN 2070-AB78

Maleic Hydrazide, Oryzalin, Hexazinone, Streptomycin; Tolerance 
Actions

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is issuing a final tolerance rule for maleic hydrazide, 
oryzalin, hexazinone, and streptomycin. EPA has completed the 
reregistration process and issued a Reregistration Eligibility Decision 
(RED). In the reregistration process, all information to support a 
pesticide's continued registration is reviewed for adequacy and, when 
needed, supplemented with new scientific studies. Based on the RED 
tolerance assessments for the pesticide chemicals subject to this rule, 
EPA is revoking various tolerances for maleic hydrazide, oryzalin, and 
hexazinone. This rule also deletes as surplusage the term 
``negligible'' from a regulation on streptomycin.
EFFECTIVE DATES: This regulations is effective June 24, 1996.

ADDRESSES: Written objections and hearing requests, identified by the 
document control number, [OPP-300405A], may be submitted to: Hearing 
Clerk (1900), Environmental Protection Agency, Rm. M3708, 401 M St., 
SW., Washington, DC 20460. A copy of any objections and hearing 
requests filed with the Hearing Clerk should be identified by the 
document control number and submitted to: Public Response and Program 
Resources

[[Page 26119]]

Branch, Field Operations Division (7506C), Office of Pesticide 
Programs, Environmental Protection Agency, 401 M St., SW., Washington , 
DC 20460. In person, bring copy of objections and hearing requests to 
Rm. 1132, CM #2, 1921 Jefferson Davis Hwy., Arlington, VA 22202. Fees 
accompanying objections shall be labeled ``Tolerance Petition Fees'' 
and forwarded to: EPA Headquarters Accounting Operations Branch, OPP 
(Tolerance Fees), P.O. Box 360277M, Pittsburgh, PA 15251. An electronic 
copy of objections and hearing requests filed with the Hearing Clerk 
may be submitted to OPP by sending electronic mail (e-mail) to:opp-
[email protected].
    Copies of electronic objections and hearing requests must be 
submitted as an ASCII file avoiding the use of special characters and 
any form of encryption. Copies of electronic objections and hearing 
requests will also be accepted on disks in WordPerfect 5.1 file format 
or ASCII file format. All copies of electronic objections and hearing 
requests must be identified by the docket number [OPP-300405A] . No 
Confidential Business Information (CBI) should be submitted through e-
mail. Copies of electronic objections and hearing requests on this rule 
may be filed online at many Federal Depository Libraries. Additional 
information on electronic submissions can be found below in this 
document.

FOR FURTHER INFORMATION CONTACT: By mail: Jeff Morris, Special Review 
and Reregistration Division (7508W), Environmental Protection Agency, 
401 M St., SW., Washington, DC 20460. Office location: Special Review 
Branch, Crystal Station #1, 3rd Floor, 2800 Crystal Drive, Arlington, 
VA 22202. Telephone: (703)-308-8029; e-mail: 
[email protected].
SUPPLEMENTARY INFORMATION: In the Federal Register of December 6, 1995 
(60 FR 62361), EPA issued a proposed rule that gave notice that EPA 
intended to revoke various tolerances for maleic hydrazide, oryzalin, 
and hexazinone. EPA also proposed to delete as surplusage the term 
``negligible'' from a regulation on streptomycin.
    There were no comments or requests for referral to an advisory 
committee received in response to the proposed rule.
    The data submitted with the proposal and other relevant material 
have been evaluated and discussed in the proposed rule. Based on the 
data and information considered, the Agency concludes that the 
tolerances are not needed to protect the public health. Therefore, the 
tolerances are being removed as set forth below.
    Any person adversely affected by this regulation may, within 30 
days after publication of this document in the Federal Register, file 
written objections to the regulation and may also request a hearing on 
those objections. Objections and hearing requests must be filed with 
the Hearing Clerk, at the address given above (40 CFR 178.20). A copy 
of the objections and/or hearing requests filed with the Hearing Clerk 
should be submitted to the OPP docket for this rulemaking. The 
objections submitted must specify the provisions of the regulation 
deemed objectionable and the grounds for the objections (40 CFR 
178.25). Each objection must be accompanied by the fee prescribed by 40 
CFR 180.33(i). If a hearing is requested, the objections must include a 
statement of the factual issue(s) on which a hearing is requested, the 
requestor's contentions on such issues, and a summary of any evidence 
relied upon by the objector (40 CFR 178.27). A request for a hearing 
will be granted if the Administrator determines that the material 
submitted shows the following: There is genuine and substantial issue 
of fact; there is a reasonable possibility that available evidence 
identified by the requestor would, if established, resolve one or more 
of such issues in favor of the requestor, taking into account 
uncontested claims or facts to the contrary; and resolution of the 
factual issue(s) in the manner sought by the requestor would be 
adequate to justify the action requested (40 CFR 178.32).
    EPA has established a record for this rulemaking under docket 
number [OPP-300405A] (including any comments and data submitted 
electronically). A public version of this record, including printed, 
paper versions of electronic comments, which does not include any 
information claimed as CBI, is available for inspection from 8 a.m. to 
4:30 p.m., Monday through Friday, excluding legal holidays. The public 
record is located in Room 1132 of the Public Response and Program 
Resources Branch, Field Operations Division (7506C), Office of 
Pesticide Programs, Environmental Protection Agency, Crystal Mall #2, 
1921 Jefferson Davis Highway, Arlington, VA.
    Electronic comments may be sent directly to EPA at:
    [email protected].

    Electronic comments must be submitted as an ASCII file avoiding the 
use of special characters and any form of encryption.
    The official record for this rulemaking, as well as the public 
version, as described above will be kept in paper form. Accordingly, 
EPA will transfer any copies of objections and hearing requests 
received electronically into printed, paper form as they are received 
and will place the paper copies in the official rulemaking record which 
will also include all comments submitted directly in writing. The 
official rulemaking record is the paper record maintained at the 
address in ``ADDRESSES'' at the beginning of this document.
    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to all the requirements of the Executive Order 
(i.e., Regulatory Impact Analysis, review by the Office of Management 
and Budget (OMB)). Under section 3(f), the order defines 
``significant'' as those actions likely to lead to a rule (1) having an 
annual effect on the economy of $100 million or more, or adversely and 
materially affecting a sector of the economy, productivity, 
competition, jobs, the environment, public health or safety, or State, 
local or tribal governments or communities (also known as 
``economically significant''); (2) creating serious inconsistency or 
otherwise interfering with an action taken or planned by another 
agency; (3) materially altering the budgetary impacts of entitlement, 
grants, user fees, or loan programs; or (4) raising novel legal or 
policy issues arising out of legal mandates, the President's 
priorities, or the principles set forth in this Executive Order.
    Pursuant to the terms of this Executive Order, EPA has determined 
that this rule is not ``significant'' and is therefore not subject to 
OMB review.
    Pursuant to the requirements of the Regulatory Flexibility Act 
(Pub. L. 96-354, 94 Stat. 1164, 5 U.S.C. 601-612), the Administrator 
has determined that regulations establishing new tolerances or raising 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant economic impact on a substantial number of 
small entities. A certification statement to this effect was published 
in the Federal Register of May 4, 1981 (46 FR 24950).
    This final rule contains no Federal mandates under Title II of the 
Unfunded Mandates Reform Act of 1995, Pub. L. 104-4, for State, local, 
or tribal governments or the private sector, because it would not 
impose enforceable duties on them.

List of Subjects in 40 CFR Part 180

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Pesticides

[[Page 26120]]

and pests, Reporting and recordkeeping requirements.

    Dated: May 14, 1996.

Lois Rossi,
Director, Special Review and Reregistration Division, Office of 
Pesticide Programs.
    Therefore, 40 CFR part 180 is amended as follows:

PART 180--[AMENDED]

    1. The authority citation for part 180 continues to read as 
follows:
    Authority: 21 U.S.C. 346a and 371.

Sec. 180.175  [Amended]

    2. In Sec. 180.175 Maleic hydrazide; tolerances for residues; by 
removing and reserving paragraph (b).

Sec. 180.245  [Amended]

    3. By amending Sec. 180.245 Streptomycin; tolerances for residues; 
by removing the term ``negligible'' from the text.

Sec. 180.304  [Amended]

    4. In Sec. 180.304 Oryzalin; tolerances for residues; by amending 
paragraph (a) in the table therein by removing the entries for 
``cottonseed,'' ``grain, barley,'' ``grain, wheat,'' ``peas 
(succulent),'' ``potatoes,'' and ``soybeans.''

Sec. 180.396  [Amended]

    5. In Sec. 180.396 Hexazinone; tolerances for residues; by amending 
paragraph (a) in the table therein by removing the entries for 
``eggs,'' ``poultry, fat,'' ``poultry, mbyp,'' ``poultry, meat,'' 
``pineapple, fodder,'' and ``pineapple, forage.''

[FR Doc. 96-13021 Filed 5-23-96; 8:45 am]

BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-13019 Oxo-Alkyl Acetates; Tolerance Exemption
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26117-26118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-13019]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 180

[OPP-300412A; FRL-5359-4]
RIN 2070-AB78

Oxo-Alkyl Acetates; Tolerance Exemption

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document exempts from the requirements of a tolerance 
residues of a group of chemicals known as oxo-alkyl acetates [oxo-hexyl 
acetate (CAS Reg. No. 88230-35-7), oxo-heptyl acetate (CAS Reg. No. 
90438-79-2), oxo-octyl acetate (CAS Reg. No. 108419-32-5), oxo-nonyl 
acetate (CAS Reg. No.108419-34-7), oxo-decyl acetate (CAS Reg. No. 
108419-33-6), and oxo-tridecyl acetate (CAS Reg. No. 108419-35-8)] when 
used as a solvent in pesticide formulations. This regulation was 
requested by Exxon Chemical Co., Performance Products Group.

EFFECTIVE DATE: May 24, 1996.

ADDRESSES: Written objections and hearing requests, identified by the 
document control number, [OPP-300412A], may be submitted to: Hearing 
Clerk (1900), Environmental Protection Agency, Rm. M3708, 401 M St., 
SW., Washington, DC 20460. Fees accompanying objections and hearing 
requests shall be labeled ``Tolerance Petition Fees'' and forwarded to: 
EPA Headquarters Accounting Operations Branch, OPP (Tolerance Fees), 
P.O. Box 360277M, Pittsburgh, PA 15251. A copy of any objections and 
hearing requests filed with the Hearing Clerk should be identified by 
the document control number and submitted to: Public Response and 
Program Resources Branch, Field Operations Division (7506C), Office of 
Pesticide Programs, Environmental Protection Agency, 401 M St., SW., 
Washington, DC 20460. In person, bring copy of objections and hearing 
requests to: Rm. 1132, CM #2, 1921 Jefferson Davis Hwy., Arlington, VA 
22202.
    A copy of objections and hearing requests filed with the Hearing 
Clerk may also be submitted electronically by sending electronic mail 
(e-mail) to: [email protected]. Copies of objections and 
hearing requests must be submitted as an ASCII file avoiding the use of 
special characters and any form of encryption. Copies of objections and 
hearing requests will also be accepted on disks in WordPerfect in 5.1 
file format or ASCII file format. All copies of objections and hearing 
requests in electronic form must be identified by the docket number 
[OPP-300412A]. No Confidential Business Information (CBI) should be 
submitted through e-mail. Electronic copies of objections and hearing 
requests on this rule may be filed online at many Federal Depository 
Libraries. Additional information on electronic submissions can be 
found below in this document.

FOR FURTHER INFORMATION CONTACT: By mail: Amelia M. Acierto, 
Registration Support Branch, Registration Division (7505W), Office of 
Pesticide Programs, Environmental Protection Agency, 401 M St., SW., 
Washington, DC 20460. Office location, telephone number, and e-mail 
address: 2800 Crystal Drive, North Tower, Arlington, VA, 703-308-8375; 
e-mail: [email protected].
SUPPLEMENTARY INFORMATION: In the Federal Register of February 14, 1996 
(61 FR 5728), Exxon Chemical Co., Performance Products Group, Linden, 
NJ 07036, submitted pesticide petition (PP) 3E04267 to EPA requesting 
that the Administrator, pursuant to section 408(e) of the Federal Food, 
Drug, and Cosmetic Act (FFDCA), 21 U.S.C. 346a(e), propose to amend 40 
CFR 180.1001(d) by establishing an exemption from the requirement of a 
tolerance for oxo-alkyl acetates [oxo-hexyl acetate (CAS Reg. No. 
88230-35-7), oxo-heptyl acetate (CAS Reg. No. 90438-79-2), oxo-octyl 
acetate (CAS Reg. No. 108419-32-5), oxo-nonyl acetate (CAS Reg. No. 
108419-34-7), oxo-decyl acetate (CAS Reg. No. 108419-33-6), and oxo-
tridecyl acetate (CAS Reg. No. 108419-35-8)] when used as solvents in 
pesticide formulations applied to growing crops only.
    There were no comments received in response to the proposed rule.
    Based upon an evaluation of the toxicological data which shows no 
evidence of mutagenicity (Ames Test), and no significant acute and 
subchronic or developmental toxicity of the branched alkyl acetates in 
this molecular weight range (C8-C13 alkyl acetates), the 
Agency concludes that this chemical poses no significant risks under 
the conditions of use and that no further data are required.
    Based upon the toxicological data evaluated, the physico-chemical 
properties of oxo-alkyl acetates and information regarding their use, 
the Agency has found that, when used in accordance with good 
agricultural practice, these ingredients are useful and a tolerance is 
not necessary to protect the public health. Therefore, EPA is exempting 
oxo-alkyl acetates from the requirement of a tolerance as set forth 
below.
    Any person adversely affected by this regulation may, within 30 
days after publication of this document in the Federal Register, file 
written objections to the regulation and may also request a hearing on 
those objections. Objections and hearing requests must be filed with 
the Hearing Clerk, at the address given above (40 CFR 178.20). A copy 
of the objections and/or hearing requests filed with the Hearing Clerk 
should be submitted to the OPP docket for this rulemaking. The 
objections submitted must specify the provisions

[[Page 26118]]

of the regulation deemed objectionable and the grounds for the 
objections (40 CFR 178.25). Each objection must be accompanied by the 
fee prescribed by 40 CFR 180.33(i). If a hearing is requested, the 
objections must include a statement of the factual issue(s) on which a 
hearing is requested, the requestor's contentions on such issues, and a 
summary of any evidence relied upon by the objector (40 CFR 178.27). A 
request for a hearing will be granted if the Administrator determines 
that the material submitted shows the following: There is genuine and 
substantial issue of fact; there is a reasonable possibility that 
available evidence identified by the requestor would, if established, 
resolve one or more of such issues in favor of the requestor, taking 
into account uncontested claims or facts to the contrary; and 
resolution of the factual issue(s) in the manner sought by the 
requestor would be adequate to justify the action requested (40 CFR 
178.32).
    EPA has established a record for this rulemaking under docket 
number [OPP-300401A] (including any comments and data submitted 
electronically). A public version of this record, including printed, 
paper versions of electronic comments, which does not include any 
information claimed as CBI, is available for inspection from 8 a.m. to 
4:30 p.m., Monday through Friday, excluding legal holidays. The public 
record is located in Room 1132 of the Public Response and Program 
Resources Branch, Field Operations Division (7506C), Office of 
Pesticide Programs, Environmental Protection Agency, Crystal Mall #2, 
1921 Jefferson Davis Highway, Arlington, VA.
    Electronic comments may be sent directly to EPA at:
    [email protected].

    Electronic comments must be submitted as an ASCII file avoiding the 
use of special characters and any form of encryption.
    The official record for this rulemaking, as well as the public 
version, as described above will be kept in paper form. Accordingly, 
EPA will transfer any copies of objections and hearing requests 
received electronically into printed, paper form as they are received 
and will place the paper copies in the official rulemaking record which 
will also include all comments submitted directly in writing. The 
official rulemaking record is the paper record maintained at the 
address in ``ADDRESSES'' at the beginning of this document.
    The Office of Management and Budget has exempted this proposed rule 
from the requirements of section 3 of Executive Order 12866.
    Pursuant to the requirements of the Regulatory Flexibility Act 
(Pub. L. 96-354, 94 Stat. 1164, 5 U.S.C. 601-612), the Administrator 
has determined that regulations establishing new tolerances or raising 
tolerance levels or establishing exemptions from tolerance requirements 
do not have a significant economic impact on a substantial number of 
small entities. A certification statement to this effect was published 
in the Federal Register of May 4, 1981 (46 FR 24950).

List of Subjects in 40 CFR Part 180

    Environmental protection, Administrative practice and procedure, 
Agricultural commodities, Pesticides and pests, Recording and 
recordkeeping requirements.

Dated: May 10, 1996.

Peter Caulkins,

Acting Director, Registration Division, Office of Pesticide Programs.

    Therefore, 40 CFR part 180 is amended as follows:

PART 180--[AMENDED]

    1. The authority citation for part 180 continues to read as 
follows:
    Authority: 21 U.S.C. 346a and 371.

    2. In Sec. 180.1001(d) the table is amended by adding 
alphabetically the following inert ingredients, to read as follows:

Sec. 180.1001   Exemptions from the requirement of a tolerance.

*    *    *    *    *
    (d)  *  *  *

----------------------------------------------------------------------------------------------------------------
              Inert ingredients                           Limits                             Uses               
----------------------------------------------------------------------------------------------------------------
                                                                                                                
                             *        *        *        *        *        *        *                            
Oxo-decyl acetate (CAS reg. No. 108419-33-6)    ............................                             Solvent
Oxo-heptyl acetate (CAS Reg. No. 90438-79-2)    ............................                             Solvent
Oxo-hexyl acetate (CAS Reg. No. 88230-35-7).    ............................                             Solvent
Oxo-nonyl acetate (CAS Reg. No. 108419-34-7)    ............................                             Solvent
Oxo-octyl acetate (CAS Reg. No. 108419-32-5)    ............................                             Solvent
Oxo-tridecyl acetate (CAS Reg. No. 108419-35-   ............................                             Solvent
 8).                                                                                                            
                                                                                                                
                             *        *        *        *        *        *        *                            
----------------------------------------------------------------------------------------------------------------

[FR Doc. 96-13019 Filed 5-23-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-12965 Basic Permit Requirements Under the Federal Alcohol Administration Act, Nonindustrial Use of Spirits and Wine, Bulk Sales and Bottling of Distilled Spirits (95R-023P)
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26096-26102]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12965]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Bureau of Alcohol, Tobacco and Firearms

27 CFR Parts 1, 2, and 3

[T.D. ATF-373]
RIN 1512-AB43

Basic Permit Requirements Under the Federal Alcohol 
Administration Act, Nonindustrial Use of Spirits and Wine, Bulk Sales 
and Bottling of Distilled Spirits (95R-023P)

AGENCY: Bureau of Alcohol, Tobacco and Firearms (ATF), Department of 
the Treasury.

ACTION: Final Rule, Treasury decision.

-----------------------------------------------------------------------

SUMMARY: As part of a regulatory reform initiative, the Bureau of 
Alcohol, Tobacco and Firearms (ATF) is revising and recodifying the 
regulations covering the basic permit requirements, the nonindustrial 
use of spirits and wine, and the bulk sales and bottling of distilled 
spirits under the Federal Alcohol Administration Act. Changes include 
consolidating 27 CFR parts 1, 2, and 3 into a single part 1 for ease of 
use and minor technical corrections.

[[Page 26097]]

EFFECTIVE DATE: May 24, 1996.

FOR FURTHER INFORMATION CONTACT: David Brokaw, Wine, Beer and Spirits 
Regulations Branch, Bureau of Alcohol, Tobacco and Firearms, 650 
Massachusetts Avenue, NW., Washington, DC 20226 (202) 927-8230.

SUPPLEMENTARY INFORMATION:

Background

    The regulations in 27 CFR parts 1, 2, and 3 implement various 
provisions of the Federal Alcohol Administration Act (FAA Act), 27 
U.S.C. 201 et seq. The regulations in part 1 govern the issuance, 
amendment, denial, revocation, suspension, automatic termination, and 
annulment of basic permits. These regulations implement sections 103 
and 104 of the FAA Act, 27 U.S.C. 203 and 204, which requires basic 
permits of persons engaged in business as importers, producers, or 
wholesalers of distilled spirits, wine, or malt beverages. The FAA Act 
defines the terms ``distilled spirits'' and ``wine'' to include only 
products for ``nonindustrial'' use. The regulations in part 2 specify 
the uses of distilled spirits and wine that are deemed 
``nonindustrial,'' as that term is used in section 117 of the FAA Act, 
27 U.S.C. 211(a) (5) and (a) (6). Finally, section 106 of the FAA Act, 
27 U.S.C. 206, provides that bulk distilled spirits may only be sold to 
certain classes of persons, including distillers, winemakers for the 
fortification of wine, operators of class 8 Customs bonded warehouses, 
and agencies of the United States or any State. The regulations in part 
3 implement these provisions.
    On February 21, 1995, President Clinton announced a regulatory 
reform initiative. As part of this initiative, each Federal agency was 
instructed to conduct a page by page review of all agency regulations 
to identify those which are obsolete or burdensome and those whose 
goals could be better achieved through the private sector, self-
regulation or State and local governments. In cases where the agency's 
review disclosed regulations which should be revised or eliminated, the 
agency would, as soon as possible, propose administrative changes to 
the regulations. In addition, on April 13, 1995, the Bureau published 
Notice No. 809 (60 FR 18783), which requested comments from the public 
regarding which ATF regulations could be improved or eliminated.
    ATF did not receive any specific comments from the public regarding 
27 CFR parts 1, 2, and 3. However, in keeping with the President's 
regulatory reform initiative, the Bureau has decided to consolidate 
parts 1, 2, and 3 into a single part 1 for ease of use. This 
consolidation will eliminate some of the duplicative material, such as 
definitions of terms under the FAA Act which may be found in more than 
one part.
    ATF is also making certain minor technical corrections in the new 
part 1. References to sections of the FAA Act have been corrected to 
reflect the changes in section numbering arising out of the enactment 
of the Alcoholic Beverage Labeling Act of 1988, Pub.L. 100-690. 
Definitions of the terms ``distilled spirits'' and ``wine'' which refer 
to sections of the FAA Act have been clarified by adding citations to 
Title 27 of the United States Code. Conforming changes to the 
regulations which define the ``nonindustrial'' uses of distilled 
spirits and wines have been made to reflect technical amendments to the 
sections of the Internal Revenue Code of 1986 which set forth the 
conditions under which distilled spirits and wines may be withdrawn 
free of tax. See 26 U.S.C. 5214 (a) (2) and 5362 (c) (9). Finally, 
references in section 1.30 to the form for executing a power of 
attorney have been updated to refer to Form 5000.8 (1534), to reflect 
the new number for that form. ATF is making several other minor 
technical changes in the regulations.

Paperwork Reduction Act

    The provisions of the Paperwork Reduction Act of 1980, Pub. L. 96-
511, 44 U.S.C. Chapter 35, and its implementing regulations, 5 CFR Part 
1320, do not apply to this rule because no new requirement to collect 
information is imposed.

Regulatory Flexibility Act

    Because no notice of proposed rulemaking is required for this rule, 
the provisions of the Regulatory Flexibility Act (5 U.S.C. 601 et seq.) 
do not apply.

Executive Order 12866

    It has been determined that this rule is not a significant 
regulatory action because it will not, (1) Have an annual effect on the 
economy of $100 million or more or adversely affect in a material way 
the economy, a sector of the economy, productivity, competition, jobs, 
the environment, public health or safety, or State, local or tribal 
governments or communities; (2) Create a serious inconsistency or 
otherwise interfere with an action taken or planned by another agency; 
(3) Materially alter the budgetary impact of entitlements, grants, user 
fees, or loan programs or the rights and obligations of recipients 
thereof; or (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
Executive Order 12866.

Administrative Procedures Act

    Because this final rule merely makes technical amendments and 
conforming changes to improve the clarity of the regulations, it is 
unnecessary to issue this final rule with notice and public procedure 
under 5 U. S. C. 553(b). Similarly, it is unnecessary to subject this 
final rule to the effective date limitation of 5 U.S.C. 553(d).

Drafting Information

    The principal author of this document is David W. Brokaw, Wine, 
Beer, and Spirits Regulations Branch, Bureau of Alcohol, Tobacco, and 
Firearms.

List of Subjects in 27 CFR Part 1

    Administrative practices and procedures, Alcohol and alcoholic 
beverages, Authority delegations, Imports, Liquors, Warehouses, and 
Wine.

Authority and Issuance

PARTS 2 AND 3--[REMOVED]

    Paragraph 1. Title 27 Code of Federal Regulations parts 2 and 3 are 
removed and part 1 is revised as follows:

PART 1--BASIC PERMIT REQUIREMENTS UNDER THE FEDERAL ALCOHOL 
ADMINISTRATION ACT, NONINDUSTRIAL USE OF DISTILLED SPIRITS AND 
WINE, BULK SALES AND BOTTLING OF DISTILLED SPIRITS

Subpart A--Scope

Sec.
1.1  General.
1.2  Territorial extent.
1.3  Forms prescribed.

Subpart B--Definitions

1.4  Meaning of terms.

Subpart C--Basic Permits

When Required

1.20  Importers.
1.21  Domestic producers, rectifiers, blenders, and warehousemen.
1.22  Wholesalers.
1.23  State agencies.

Persons Entitled to Basic Permits

1.24  Qualifications of applicants.

Applications for Permits

1.25  General.
1.26  Incomplete or incorrectly executed applications.
1.27  Change in ownership, management, or control of the applicant.
1.29  Individual plant or premises.
1.30  Power of attorney; Form 5000.8 (1534).
1.31  Denial of permit applications.

[[Page 26098]]

Authorization

1.35  Authority to issue, amend, deny, suspend, revoke, or annul 
basic permits.

Amendment and Duration of Basic Permits

1.40  Change of name.
1.41  Change of address.
1.42  Change in ownership, management, or control of business.
1.43  Duration of permits.
1.44  Automatic termination of permits. Revocation, Suspension, or 
Annulment of Basic Permits
1.50  Revocation or suspension.
1.51  Annulment.
1.52  Disposition of stocks of alcoholic beverages upon revocation, 
annulment, or automatic termination of basic permit.

Miscellaneous

1.55  Recalling permits for correction.
1.56  Oaths and affirmations.
1.57  Procedure.
1.58  Filing of permits.
1.59  Public information as to applications acted upon.

Subpart D--Nonindustrial Use of Distilled Spirits and Wine

Uses Regarded as Industrial

1.60  Use of distilled spirits.
1.61  Use of wine.
1.62  Use of distilled spirits or wine for experimental purposes and 
in manufacture of nonbeverage products.

Uses Classed as Nonindustrial

1.70  General.
1.71  Distilled spirits in containers of a capacity of one gallon or 
less.

Subpart E--Bulk Sales and Bottling of Distilled Spirits

Bulk Sales and Bottling

1.80  Sales of distilled spirits in bulk.
1.81  Importation of distilled spirits in bulk.
1.82  Acquiring or receiving distilled spirits in bulk for 
redistillation, processing, rectification, warehousing, or 
warehousing and bottling.
1.83  Acquiring or receiving distilled spirits in bulk for addition 
to wine.
1.84  Acquisition of distilled spirits in bulk by Government 
agencies.

Warehouse Receipts

1.90  Distilled spirits in bulk.
1.91  Bottled distilled spirits.

Sales of Distilled Spirits for Industrial Use

1.95  General.

    Authority: 27 U.S.C. 203, 204, 206, 211 unless otherwise noted.

Subpart A--Scope

Sec. 1.1  General.

    (a) The regulations in this part relate to requirements governing 
the issuance, amendment, denial, revocation, suspension, automatic 
termination, and annulment of basic permits and the duration of 
permits, except that the provisions of part 200, Rules of Practice in 
Permit Proceedings, of this chapter are hereby made applicable to 
administrative proceedings with respect to the application for, and to 
the suspension, revocation, or annulment of, basic permits under the 
Federal Alcohol Administration Act.
    (b) The regulations in this part also specify what uses of 
distilled spirits and wine are ``nonindustrial,'' as that term is used 
in section 117 of the Federal Alcohol Administration Act (27 U.S.C. 
211). Finally, this part, in accordance with section 106 of the Federal 
Alcohol Administration Act (27 U.S.C. 206), contains the substantive 
requirements relative to bulk sales and bottling of distilled spirits 
under the Federal Alcohol Administration Act, including the terms of 
warehouse receipts for distilled spirits in bulk. No procedural 
requirements are prescribed.

Sec. 1.2  Territorial extent.

    The provisions of this part are applicable to the several States of 
the United States, the District of Columbia and Puerto Rico.

Sec. 1.3  Forms prescribed.

    (a) The Director is authorized to prescribe all forms required by 
this part. All of the information called for in each form shall be 
furnished as indicated by the headings on the form and the instructions 
on or pertaining to the form. In addition, information called for in 
each form shall be furnished as required by this part.
    (b) Requests for forms should be mailed to the ATF Distribution 
Center, PO Box 5950, Springfield, Virginia 22153-5950

Subpart B--Definitions

Sec. 1.4  Meaning of terms.

    As used in this part, unless the context otherwise requires, terms 
shall have the meaning ascribed in this part.
    Act. The Federal Alcohol Administration Act.
    Alcohol. Ethyl alcohol distilled at or above 190 deg. proof.
    Applicant. Any person who has filed with the regional director 
(compliance) an application for a basic permit under the Federal 
Alcohol Administration Act.
    ATF officer. An officer or employee of the Bureau of Alcohol, 
Tobacco and Firearms (ATF) authorized to perform any function relating 
to the administration and enforcement of this part.
    Basic permit. A formal document issued under the Act in the form 
prescribed by the Director, authorizing the person named therein to 
engage in the activities specified at the location stated.
    Brandy. Brandy or wine spirits for addition to wines as permitted 
by internal revenue law.
    Director. The Director, Bureau of Alcohol, Tobacco and Firearms, 
the Department of the Treasury, Washington, DC.
    Distilled spirits. Section 117(a) of the Federal Alcohol 
Administration Act (27 U.S.C. 211(a)) defines ``distilled spirits'' as 
ethyl alcohol, hydrated oxide of ethyl, spirits of wine, whiskey, rum, 
brandy, gin, and other distilled spirits, including all dilutions and 
mixtures thereof for nonindustrial use.
    In bulk. Distilled spirits in containers having a capacity in 
excess of one wine gallon.
    Other term. Any other term defined in the Federal Alcohol 
Administration Act and used in this part shall have the same meaning 
assigned to it by the Act.
    Permittee. Any person holding a basic permit issued under the 
Federal Alcohol Administration Act.
    Person. Any individual, partnership, joint-stock company, business 
trust, association, corporation, or other form of business enterprise, 
including a receiver, trustee, or liquidating agent.
    Regional director (compliance). The principal ATF regional official 
responsible for administering regulations in this part.
    Resale at wholesale. A sale to any trade buyer.
    Trade buyer. Any person who is a wholesaler or retailer of 
distilled spirits, wine, or malt beverages.
    Wine. Section 117(a) of the Federal Alcohol Administration Act (27 
U.S.C. 211(a)) defines ``wine'' as:
    (a) Wine as defined in section 610 and section 617 of the Revenue 
Act of 1918 (26 U.S.C. 5381-5392), as now in force or hereafter 
amended, and
    (b) Other alcoholic beverages not so defined, but made in the 
manner of wine, including sparkling and carbonated wine, wine made from 
condensed grape must, wine made from other agricultural products than 
the juice of sound, ripe grapes, imitation wine, compounds sold as 
wine, vermouth, cider, perry, and sake; in each instance, only if 
containing not less than 7 percent and not more than 24 percent of 
alcohol by volume, and if for nonindustrial use.
    Wine gallon. The liquid measure equivalent to the volume of 231 
cubic inches.

Subpart C--Basic Permits

When Required

Sec. 1.20  Importers.

    No person, except pursuant to a basic permit issued under the Act, 
shall:

[[Page 26099]]

    (a) Engage in the business of importing into the United States 
distilled spirits, wine, or malt beverages; or
    (b) While so engaged, sell, offer or deliver for sale, contract to 
sell, or ship, in interstate or foreign commerce, directly or 
indirectly or through an affiliate, distilled spirits, wine, or malt 
beverages so imported.

Sec. 1.21  Domestic producers, rectifiers, blenders, and warehousemen.

    No person, except pursuant to a basic permit issued under the Act, 
shall:
    (a) Engage in the business of distilling distilled spirits, 
producing wine, rectifying or blending distilled spirits or wine, or 
bottling, or warehousing and bottling, distilled spirits; or
    (b) While so engaged, sell, offer or deliver for sale, contract to 
sell, or ship, in interstate or foreign commerce, directly or 
indirectly or through an affiliate, distilled spirits or wine so 
distilled, produced, rectified, blended, or bottled, or warehoused and 
bottled.

Sec. 1.22  Wholesalers.

    No person, except pursuant to a basic permit issued under the Act, 
shall:
    (a) Engage in the business of purchasing for resale at wholesale, 
distilled spirits, wine, or malt beverages; or,
    (b) While so engaged, receive, sell, offer or deliver for sale, 
contract to sell, or ship in interstate or foreign commerce, directly 
or indirectly or through an affiliate, distilled spirits, wine, or malt 
beverages so purchased.

Sec. 1.23  State agencies.

    This subpart shall not apply to any agency of a State or political 
subdivision thereof or to any officer or employee of any such agency, 
and no such agency or officer or employee thereof shall be required to 
obtain a basic permit under this subpart.

Persons Entitled to Basic Permits

Sec. 1.24  Qualifications of applicants.

    The application of any person shall be granted and the permit 
issued by the regional director (compliance) if the applicant proves to 
the satisfaction of the regional director (compliance) that:
    (a) Such person (or in case of a corporation, any of its officers, 
directors, or principal stockholders) has not, within 5 years prior to 
the date of application, been convicted of a felony under Federal or 
State law, and has not, within 3 years prior to date of application, 
been convicted of a misdemeanor under any Federal law relating to 
liquor, including the taxation thereof; and
    (b) Such person, by reason of the person's business experience, 
financial standing or trade connections, is likely to commence 
operations as a distiller, warehouseman and bottler, rectifier, wine 
producer, wine blender, importer, or wholesaler, as the case may be, 
within a reasonable period and to maintain such operations in 
conformity with Federal law; and
    (c) The operations proposed to be conducted by such person are not 
in violation of the law of the State in which they are to be conducted.

Applications for Permits

Sec. 1.25  General.

    Applications for basic permits to engage in any of the operations 
set forth in Secs. 1.20 to 1.22 shall be made on the appropriate form 
prescribed by the Director, verified as required by Sec. 1.56, and 
shall be accompanied by such affidavits, documents, and other 
supporting data, as the Director or the regional director (compliance) 
shall require. All data, written statements, affidavits, documents, or 
other evidence submitted in support of the application, or upon hearing 
thereon, shall be deemed to be a part of the application. All 
applications shall be filed by mailing or delivering the same to the 
office of the regional director (compliance).

Sec. 1.26  Incomplete or incorrectly executed applications.

    Incomplete or incorrectly executed applications will not be acted 
upon, but the applicant shall be entitled to file a new application 
without prejudice, or to complete the application already filed.

Sec. 1.27  Change in ownership, management, or control of the 
applicant.

    In the event of any change in the ownership, management, or control 
of the applicant (in case of a corporation, any change in the officers, 
directors, or persons holding more than 10 percent of the corporate 
stock), after the date of filing of any application for a basic permit 
and prior to final action on such application, the applicant shall 
notify the regional director (compliance) immediately of such change.

Sec. 1.29

Individual plant or premises.

    An application for a basic permit must be filed, and permit issued, 
to cover each individual plant or premises where any of the businesses 
specified in section 103 of the Act is engaged in, such application to 
be filed with and permit issued by the regional director (compliance) 
for the region wherein such plant or premises is located.

Sec. 1.30  Power of attorney; Form 5000.8 (1534).

    If the application and other documents in support of such 
application are signed by an attorney in fact of an individual, 
partnership, association, or corporation, or by one of the members of a 
copartnership or association, or, in the case of a corporation by an 
officer or other person not authorized by the corporation's bylaws or 
by its board of directors to sign such applications and supporting 
documents, the applications must be supported by a duly authenticated 
copy of the power of attorney conferring authority upon the person 
signing the documents to execute the same. Such powers of attorney will 
be executed on Form 5000.8 (1534), in triplicate, and submitted to the 
regional director (compliance).

(Approved by the Office of Management and Budget under control 
number 1512-0079)

Sec. 1.31  Denial of permit applications.

    If, upon examination of any application for a basic permit, the 
regional director (compliance) has reason to believe that the applicant 
is not entitled to such a permit, the regional director (compliance) 
shall institute proceedings for the denial of the application in 
accordance with the procedure set forth in part 200 of this chapter.

Authorization

Sec. 1.35  Authority to issue, amend, deny, suspend, revoke, or annul 
basic permits.

    The authority and power of issuing, amending, or denying basic 
permits, or amendments thereof, is conferred upon the Director and 
(except as to agency initiated curtailment) upon the regional director 
(compliance). The authority and power of suspending, revoking, or 
annulling basic permits is conferred upon the Director, and upon the 
administrative law judges referred to in part 200 of this chapter. The 
Director, upon consideration of appeals on petitions for review, may 
order the regional director (compliance) to issue, deny, suspend, 
revoke, or annul basic permits.

Amendment and Duration of Basic Permits

Sec. 1.40  Change of name.

    In the event of any change in the name (trade or corporate name) of 
a permittee, or, in the event a permittee desires to engage in 
operations under an additional trade name, such permittee must file 
application Form 5100.18 (1643), with the regional director 
(compliance), for an amended basic

[[Page 26100]]

permit, which application must be approved, and amended permit issued, 
before operations may be commenced under the new name.

(Approved by the Office of Management and Budget under control 
number 1512-0090)

Sec. 1.41  Change of address.

    In the event of a change in address the permittee must file 
application Form 5100.18 (1643), with the regional director 
(compliance), for an amended basic permit.

Sec. 1.42  Change in ownership, management, or control of business.

    In the event of any change in the ownership, management, or control 
of any business operated pursuant to a basic permit (if the permittee 
is a corporation, if any change occurs in the officers, directors, or 
persons owning or controlling more than 10 percent of the voting stock 
of said corporation) the permittee shall immediately notify the 
regional director (compliance) of such change, giving the names and 
addresses of all new persons participating in the ownership, 
management, or control of such business, or in the case of a 
corporation, the names and addresses of such new officers, directors, 
or persons owning or controlling more than 10 percent of the voting 
stock. Notice to the regional director (compliance) of any such change 
shall be accompanied or supplemented by such data in reference to the 
personal or business history of such persons as the regional director 
(compliance) may require.

Sec. 1.43  Duration of permits.

    A basic permit shall continue in effect until suspended, revoked, 
annulled, voluntarily surrendered, or automatically terminated, as 
provided in the Act and in this part.

Sec. 1.44  Automatic termination of permits.

    No basic permit shall be leased, sold, or otherwise voluntarily 
transferred, and, in the event of such lease, sale, or other voluntary 
transfer, such basic permit shall automatically terminate thereupon. If 
any basic permit is transferred by operation of law or if actual or 
legal control of the permittee is acquired, directly or indirectly 
whether by stock ownership or in any other manner, by any person, then 
such permit shall be automatically terminated at the expiration of 30 
days thereafter: Provided, That if within such 30-day period 
application for a new basic permit is made by the transferee or 
permittee, respectively, then the outstanding basic permit shall 
continue in effect until such time as the application is finally acted 
upon.

Revocation, Suspension, or Annulment of Basic Permits

Sec. 1.50  Revocation or suspension.

    Whenever the regional director (compliance) has reason to believe 
that any permittee has willfully violated any of the conditions of the 
permittee's basic permit or has not engaged in the operations 
authorized by the permit for a period of more than two years, the 
regional director (compliance) shall institute proceedings for the 
revocation or suspension of such permit, in accordance with the 
procedure set forth in part 200 of this chapter, which part is made 
applicable to such proceedings.

Sec. 1.51  Annulment.

    Whenever the regional director (compliance) has reason to believe 
that any basic permit was procured through fraud, or misrepresentation 
or concealment of material fact, the regional director (compliance) 
shall institute proceedings for the annulment of such permit in 
accordance with the procedure set forth in part 200 of this chapter, 
which part is made applicable to such proceedings.

Sec. 1.52  Disposition of stocks of alcoholic beverages upon 
revocation, annulment, or automatic termination of basic permit.

    In the event of the revocation or annulment of a basic permit, 
pursuant to part 200 of this chapter, or in the event such permit is 
automatically terminated by operation of law (27 U.S.C. 204(g) and 
Sec. 1.44 of this part), the regional director (compliance) may 
authorize the orderly disposition of stocks of distilled spirits, 
wines, or malt beverages then held by the permittee or former permittee 
upon such conditions as may be considered proper.

Miscellaneous

Sec. 1.55  Recalling permits for correction.

    Whenever it shall be discovered that any basic permit has been 
issued authorizing acts, or combinations of acts, which may not 
properly, under the law and regulations, as of now or hereafter in 
force, be authorized, or that any material mistake has occurred in the 
issuance thereof, the holder of such permit shall forthwith surrender 
the same for correction or amendment upon demand of the regional 
director (compliance).

Sec. 1.56  Oaths and affirmations.

    Any document required by regulations or instructions of the 
Director to be verified, shall be so verified upon oath or affirmation 
taken before a person authorized by the laws of the United States or by 
State or local law to administer oaths or affirmations in the 
jurisdiction wherein such document is to be executed.

Sec. 1.57  Procedure.

    The procedures prescribed by the rules of practice in permit 
proceedings (part 200 of this chapter) are applicable to administrative 
proceedings for the issuance, amendment, denial, revocation, 
suspension, or annulment of basic permits, the issuance of subpoenas 
and the taking of depositions under the Act.

Sec. 1.58  Filing of permits.

    Every person receiving a basic permit under the provisions of this 
part must file the same, at the place of business covered by the basic 
permit, so that it may be examined by ATF officers.

Sec. 1.59  Public information as to applications acted upon.

    The regional director (compliance) shall cause to be maintained 
currently in the regional director's (compliance) office for public 
inspection, until the expiration of one year following final action on 
the application, the following information with respect to each 
application for basic permit filed:
    (a) The name, including trade name or names, if any, and the 
address of the applicant; the kind of permit applied for and the 
location of the business; whether the applicant is an individual, a 
partnership or a corporation; if a partnership, the name and address of 
each partner; if a corporation, the name and address of each of the 
principal officers and of each stockholder owning 10 percent or more of 
the corporate stock.
    (b) The time and place set for any hearing on the application.
    (c) The final action taken on the application. In the event a 
hearing is held upon an application for a basic permit, the regional 
director (compliance) shall make available for inspection at the 
regional director's (compliance) office, upon request therefor: The 
transcript of the hearing, a copy of the administrative law judge's 
recommended decision, a copy of the regional director's (compliance) 
decision and, in the event of an appeal to the Director, the decision 
on appeal with the reasons given in support thereof.

Subpart D--Nonindustrial Use of Distilled Spirits and Wine

Uses Regarded as Industrial

Sec. 1.60  Use of distilled spirits.

    The following uses of distilled spirits are regarded as 
``industrial'' and will be

[[Page 26101]]

excluded from any application of the term ``nonindustrial use.'' The 
use of distilled spirits:
    (a) Free of tax by, and for the use of, the United States or any 
governmental agency thereof, any State, any political subdivision of a 
State, or the District of Columbia, for nonbeverage purposes; or
    (b) Free of tax for nonbeverage purposes and not for resale or use 
in the manufacture of any product for sale:
    (1) For the use of any educational organization described in 26 
U.S.C. 170(b)(1)(A)(ii) which is exempt from income tax under 26 U.S.C. 
501(a), or for the use of any scientific university or college of 
learning;
    (2) For any laboratory for use exclusively in scientific research;
    (3) For use at any hospital, blood bank, or sanitarium (including 
use in making analysis or test at such hospital, blood bank, or 
sanitarium), or at any pathological laboratory exclusively engaged in 
making analyses, or tests, for hospitals or sanitariums; or
    (4) For the use of any clinic operated for charity and not for 
profit (including use in compounding of bona fide medicines for 
treatment outside of such clinics of patients thereof); or
    (c) Free of tax, after denaturation of such spirits in the manner 
prescribed by law for:
    (1) Use in the manufacture of ether, chloroform, or other definite 
chemical substance where such distilled spirits are changed into some 
other chemical substance and do not appear in the finished product; or
    (2) Any other use in the arts and industries (except for uses 
prohibited by 26 U.S.C. 5273 (b) or (d)) and for fuel, light, and 
power.

Sec. 1.61  Use of wine.

    The following uses of wine are regarded as ``industrial'' and will 
be excluded from any application of the term ``nonindustrial''. The use 
of wine:
    (a) Without payment of tax for use in the production of vinegar; or
    (b) Free of tax for experimental or research purposes by any 
scientific university, college of learning, or institution of 
scientific research; or
    (c) Free of tax for use by the United States or any agency thereof, 
and for use for analysis, testing, research, or experimentation by the 
governments of the several States and the District of Columbia or of 
any political subdivision thereof or by any agency of such governments; 
or
    (d) Which has been rendered unfit for beverage use.

Sec. 1.62  Use of distilled spirits or wine for experimental purposes 
and in manufacture of nonbeverage products.

    The use of distilled spirits or wine for experimental purposes and 
in the manufacture of (a) medicinal, pharmaceutical, or antiseptic 
products, including prescriptions compounded by retail druggists; (b) 
toilet preparations; (c) flavoring extracts, syrups, or food products; 
or (d) scientific, chemical, mechanical, or industrial products, 
provided such products are unfit for beverage use, is regarded as 
``industrial,'' and will be excluded from any application of the term 
``nonindustrial use.''

Uses Classed as Nonindustrial

Sec. 1.70  General.

    All uses of distilled spirits and wines, except as provided in 
Secs. 1.60, 1.61, and 1.62 of this part, are regarded as 
``nonindustrial.'' Such ``nonindustrial'' use shall include, but not be 
limited to, distilled spirits or wine used for beverage purposes, or in 
the manufacture, rectification, or blending of alcoholic beverages; or 
in the preparation of food or drink by a hotel, restaurant, tavern, or 
similar establishment; or for sacramental purposes; or as a medicine.

Sec. 1.71  Distilled spirits in containers of a capacity of one gallon 
or less.

    Distilled spirits in containers of a capacity of one wine gallon or 
less, except anhydrous alcohol and alcohol which may be withdrawn free 
of tax under the internal revenue laws, will be deemed to be for 
nonindustrial use.

Subpart E--Bulk Sales and Bottling of Distilled Spirits

Bulk Sales and Bottling

Sec. 1.80  Sales of distilled spirits in bulk.

    It is unlawful for any person to sell, offer to sell, contract to 
sell, or otherwise dispose of distilled spirits in bulk, for 
nonindustrial use, except for export or to the classes of persons 
enumerated in Secs. 1.82, 1.83, and 1.84.

Sec. 1.81  Importation of distilled spirits in bulk.

    It is unlawful for any person to import distilled spirits in bulk, 
for nonindustrial use, except for sale to or for use by the classes of 
persons enumerated in Secs. 1.82, 1.83 and 1.84.

Sec. 1.82  Acquiring or receiving distilled spirits in bulk for 
redistillation, processing, rectification, warehousing, or warehousing 
and bottling.

    (a) Proprietors of distilled spirits plants. Persons holding basic 
permits (issued under subpart B of this part) authorizing the 
distilling, processing, rectifying, or warehousing and bottling of 
distilled spirits, or operating permits (issued under Sec. 19.157 and 
succeeding sections of this chapter) may acquire or receive in bulk and 
redistill, warehouse, or process distilled spirits, so far as permitted 
by law.
    (b) Proprietors of class 8 customs bonded warehouses. If the 
permittee operates a class 8 customs bonded warehouse, the permittee 
may acquire or receive in bulk, and warehouse and bottle, imported 
distilled spirits, so far as permitted by the customs laws.

(26 U.S.C. 7805 (68A Stat. 917, as amended); 27 U.S.C. 205 (49 Stat. 
981, as amended))

Sec. 1.83  Acquiring or receiving distilled spirits in bulk for 
addition to wine.

    Persons holding permits as producers and blenders of wine, may, 
pursuant to such permit, acquire or receive in bulk alcohol or brandy 
for addition to wines.

Sec. 1.84  Acquisition of distilled spirits in bulk by Government 
agencies.

    Any agency of the United States, or of any State or political 
subdivision thereof, may acquire or receive in bulk, and warehouse and 
bottle, imported and domestic distilled spirits in conformity with the 
internal revenue laws.

Warehouse Receipts

Sec. 1.90  Distilled spirits in bulk.

    By the terms of the Act (27 U.S.C. 206), all warehouse receipts for 
distilled spirits in bulk must require that the warehouseman shall 
package such distilled spirits, before delivery, in bottles labeled and 
marked in accordance with law, or deliver such distilled spirits in 
bulk only to persons to whom it is lawful to sell or otherwise dispose 
of distilled spirits in bulk.

Sec. 1.91  Bottled distilled spirits.

    The provisions of the Act, which forbid any person to sell, offer 
to sell, contract to sell, or otherwise dispose of warehouse receipts 
for distilled spirits in bulk, do not apply to warehouse receipts for 
bottled distilled spirits.

    Cross Reference: For labeling of distilled spirits, see part 5 
of this chapter.

Sales of Distilled Spirits for Industrial Use

Sec. 1.95  General.

    Distillers, rectifiers, and other permittees engaged in the sale or 
other disposition of distilled spirits for nonindustrial use shall not 
sell or otherwise dispose of distilled spirits in bulk (other than 
alcohol) for industrial use, unless such distilled spirits are

[[Page 26102]]

shipped or delivered directly to the industrial user thereof.
Bradley A. Buckles,
Acting Director.

    Approved: April 29, 1996.
John P. Simpson,
Deputy Assistant Secretary (Regulatory, Tariff and Trade Enforcement).
[FR Doc. 96-12965 Filed 5-23-96; 8:45 am]
BILLING CODE 4810-31-P

Complete official Federal Register PDF

FR Doc. 96-12885 Assessments; Continuation of Adjusted Rate Schedule for BIF- Assessable Deposits
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26078-26082]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12885]

=======================================================================
-----------------------------------------------------------------------

FEDERAL DEPOSIT INSURANCE CORPORATION

12 CFR Part 327

Assessments; Continuation of Adjusted Rate Schedule for BIF-
Assessable Deposits

AGENCY: Federal Deposit Insurance Corporation (FDIC).

ACTION: Continuation of adjusted rate schedule.

-----------------------------------------------------------------------

SUMMARY: On May 14, 1996, the Board of Directors of the FDIC (Board) 
adopted a resolution to continue in effect the current downward 
adjustment to the assessment rate schedule applicable to deposits 
assessable by the Bank Insurance Fund (BIF). The continuation of the 
downward adjustment will apply to the semiannual assessment period 
beginning July 1, 1996. As a result, the BIF assessment rates will 
continue to range from 0 to 27 basis points. This rate schedule will 
result in an estimated average annual assessment rate of approximately 
0.29 basis points; the estimated annual revenue produced by this rate 
schedule will be $72 million.

EFFECTIVE DATE: July 1, 1996, through December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Frederick S. Carns, Assistant 
Director, Division of Insurance, (202) 898-3930; Christine E. Blair, 
Financial Economist, Division of Research and Statistics,

[[Page 26079]]

(202) 898-3936; James R. McFadyen, Senior Financial Analyst, Division 
of Research and Statistics, (202) 898-7027; Christopher L. Hencke, 
Counsel, Legal Division, (202) 898-8839; Federal Deposit Insurance 
Corporation, 550 17th Street, N.W., Washington, D.C., 20429.

SUPPLEMENTARY INFORMATION:

I. Continuation of Adjustment to Rate Schedule 2

    Section 7(b) of the Federal Deposit Insurance Act, 12 U.S.C. 
1817(b), provides that the Board shall set semiannual assessments for 
insured depository institutions. On August 8, 1995, the Board adopted a 
new assessment rate schedule for deposits subject to assessment by the 
BIF. 60 FR 42680 (August 16, 1995). The new schedule was codified as 
Rate Schedule 2 at 12 CFR 327.9(a). This schedule provided for an 
assessment-rate range of 4 to 31 basis points and became effective 
retroactively on June 1, 1995, the beginning of the month following the 
month in which the BIF reached its designated reserve ratio (DRR) of 
1.25 percent of total estimated insured deposits.
    In adopting Rate Schedule 2, the Board also amended the FDIC's 
assessment regulations to permit the Board to make limited adjustments 
to the schedule without notice-and-comment rulemaking. Any such 
adjustments can be made as the Board deems necessary to maintain the 
BIF reserve ratio at the DRR and can be accomplished by Board 
resolution. Under this provision, codified at 12 CFR 327.9(b), any such 
adjustment must not exceed an increase or decrease of 5 basis points 
and must be uniform across the rate schedule.
    The amount of an adjustment adopted by the Board under 12 CFR 
327.9(b) is to be determined by the following considerations: (1) the 
amount of assessment revenue necessary to maintain the reserve ratio at 
the DRR; and (2) the assessment schedule that would generate such 
amount of assessment revenue considering the risk profile of BIF 
members. In determining the relevant amount of assessment revenue, the 
Board is to consider BIF's expected operating expenses, case resolution 
expenditures and income, the effect of assessments on BIF members' 
earnings and capital, and any other factors the Board may deem 
appropriate.
    Having considered all of these factors, the Board decided on 
November 14, 1995, to adopt an adjustment factor of 4 basis points for 
the semiannual assessment period beginning January 1, 1996, with a 
resulting adjusted schedule ranging from 0 to 27 basis points. 60 FR 
63400 (December 11, 1995). The Board has now decided to adopt the same 
adjustments to Rate Schedule 2 for the upcoming semiannual period from 
July 1, 1996 to December 31, 1996. The adjusted rate schedule is set 
forth below.

 BIF Rate Schedule as Adjusted for the Second Semiannual Period of 1996 
------------------------------------------------------------------------
                                                  Supervisory subgroup  
                Capital group                 --------------------------
                                                  A        B        C   
------------------------------------------------------------------------
1............................................    \1\ 0        3       17
2............................................        3       10       24
3............................................       10       24      27 
------------------------------------------------------------------------
\1\ Subject to a statutory minimum assessment of $1,000 per semiannual  
  period (which also applies to all other assessment risk               
  classifications).                                                     

    The basis for the Board's decision is discussed below.

II. Basis for the Adjustment

A. Maintaining at the Designated Reserve Ratio

    In adopting a rate adjustment under 12 CFR 327.9(b), as mentioned 
above, the Board must consider the following: (1) the amount of 
assessment revenue necessary to maintain the reserve ratio at the DRR; 
and (2) the assessment schedule that would generate such amount of 
assessment revenue considering the risk profile of BIF members.
    The BIF reserve ratio stood at 1.30 percent as of December 31, 
1995, the latest date for which complete data are available. Assuming 
that insured deposit growth during the first half of 1996 falls within 
the range of 2 percent shrinkage to 6 percent growth annually, and 
assuming that insurance losses remain moderate as expected, the BIF 
ratio will range from 1.29 to 1.34 percent at midyear 1996 (Table 1).
    For the second half of 1996, insurance losses and operating 
expenses are expected to total under $350 million, while assessments 
plus investment income will exceed $650 million.
    Insured deposit growth for 1996 is subject to considerable 
uncertainty, as recent experience has been mixed. From 1991 through 
early 1995, the growth rate of BIF-insured deposits was essentially 
zero but, for the year ending in December 1995, BIF-insured deposits 
grew by 3 percent, with much of this growth occurring in the fourth 
quarter. In light of the 1995 experience, as well as considerable 
volatility in deposit growth experienced during the 1980s, the FDIC 
must consider the possibility that BIF-insured deposits could grow at a 
6 percent annual rate throughout 1996.
    Table 1 indicates the year-end 1996 range for the BIF reserve 
ratio, assuming a 6 percent upper bound for annual deposit growth in 
1996 and assuming that the values of other variables affecting the 
reserve ratio in the second semiannual period will fall within their 
historical ranges. While the lower bound on the year-end BIF reserve 
ratio is below the 1.25 percent target, this presumes an unexpected 
increase in insurance losses/provisions of $600 million. Such an 
increase is consistent with the historical experience of the FDIC, but 
it must be viewed as a remote possibility in light of the current 
economic environment and the near-term outlook.
    The stronger possibility is that insured-deposit growth rates could 
exceed forecasts based upon historical experience. While the 6 percent 
upper bound for deposit growth included in Table 1 is high relative to 
the experience of the 1990s, the FDIC cannot rule out such a rate of 
growth in response to the dramatic reductions in BIF assessment rates 
that were effected in the second half of 1995.
    Moreover, given the prospect of a continuing, large premium 
differential between the insurance funds, there is a realistic 
possibility of substantial deposit migration from the SAIF to the BIF. 
Though the law imposes constraints on at least some forms of deposit-
shifting from one fund to another, such constraints may be countered by 
adaptations in the marketplace. The relatively low rate of migration to 
date is not likely to be indicative of the rate to be expected going 
forward, given that many market participants may have delayed any plans 
to migrate deposits in anticipation of a legislative solution. In the 
absence of a legislative solution to date, the FDIC believes that there 
is a realistic possibility of a significant increase in deposit 
migration. However, the precise timing and ultimate magnitude of any 
increase is uncertain.
    For illustration, Table 2 examines the impact on the year-end BIF 
reserve ratio of alternative deposit migration rates during the second 
semiannual period of 1996. Columns 2 through 4 of the table indicate 
the impact of deposit migration rates under three different assumptions 
concerning ``normal'' growth of BIF-insured deposits (growth that is 
not due to migration) for 1996. For example, the ratios in the third 
column are derived under the assumption that normal deposit growth is 2 
percent for 1996 (full year); assuming also that no deposit migration 
occurs during the year, the

[[Page 26080]]

year-end BIF ratio would be 1.32 percent (the assumed values for all 
nondeposit factors affecting the reserve ratio are constant across 
columns 2-4). Table 2 indicates that, in general, each 5 percent 
increase in the annual rate of migration during the second half of 1996 
(to a maximum annual rate of 30 percent) would reduce the year-end 1996 
BIF ratio by approximately 1 basis point. If 30 percent annual 
migration in the second half of 1996 were to occur along with 6 percent 
``normal'' growth of BIF-insured deposits, the BIF ratio at year end 
would be 1.23 percent under the assumptions of Table 2.
    Given the uncertainties reviewed above, the possibility of a large 
increase in BIF-insured deposit growth during 1996 should be considered 
seriously. Despite this concern, it is the judgment of the Board that 
BIF assessment rates should not be changed at this time; rather, 
deposit flows and trends in deposit growth rates should be closely 
monitored in preparation for future decisions regarding BIF assessment 
rates.
    In summary, for the reasons discussed above, the Board believes 
that the assessment schedule for the current semiannual period will 
generate the revenue necessary to maintain the reserve ratio at the DRR 
in the next semiannual period.

B. The Long-Term Outlook

    The Board believes that an important consideration in setting rates 
is the long-term revenue needs of the BIF. A balance should exist 
between long-term BIF revenues and long-term BIF expenses (where 
expenses include monies needed to prevent dilution due to deposit 
growth). In August of 1995, the FDIC determined that an effective 
average BIF assessment rate of 4 to 5 basis points would be appropriate 
to achieve such balance. This determination was based on a thorough 
historical analysis of FDIC experience and consideration of recently 
enacted statutory provisions that may moderate deposit insurance losses 
going forward. 60 FR 42680 (August 16, 1995).
    The Board has not altered its view that, in setting rates, it 
should look beyond the immediate time frame in estimating the revenue 
needs of the BIF. Moreover, the Board continues to believe that an 
average annual assessment rate of 4 to 5 basis points would be 
appropriate to achieve a long-term balance between BIF revenues and 
expenses. As discussed in the preceding section, however, the current 
balance in the BIF also is directly relevant to determining the 
appropriate assessment level. In light of the favorable existing 
conditions and outlook for the next several months, it is anticipated 
that the current rate structure (with an assessment rate of zero for 
the least-risky institutions) will provide adequate assessment revenue 
over the near term to maintain the BIF reserve ratio at or above the 
target ratio of 1.25 percent.

C. Other Considerations

    In continuing the current adjustments to the assessment rate 
schedule, the Board has considered the effect on members' earnings and 
capital. In light of the fact that these adjustments represent a 
reduction in the rates set forth in Rate Schedule 2, the Board does not 
believe that the schedule will produce unwarranted adverse effects on 
members. Indeed, the rate for many institutions will be zero (with a 
minimum semiannual assessment of $1,000 mandated by the Federal Deposit 
Insurance Act).
    Another consideration is the statutory requirement under the 
Federal Deposit Insurance Act for a risk-based assessment system. To be 
effective, this system must incorporate a range of rates that provides 
an incentive for institutions to control risk-taking behavior while at 
the same time covering the long-term costs of the obligations borne by 
the deposit insurer. In the judgment of the Board, these goals will be 
achieved for the upcoming semiannual period by retaining the current 
spread of 27 basis points between the highest- and lowest-rated 
institutions.
    For the reasons discussed above, the Board has decided to continue 
in effect the current adjustment to the BIF assessment rate schedule 
with a range of 0 to 27 basis points for the semiannual period from 
July 1, 1996 through December 31, 1996.

    By order of the Board of Directors.

    Dated at Washington, DC, this 14th day of May, 1996.

Federal Deposit Insurance Corporation.
Robert E. Feldman,
Deputy Executive Secretary.

BILLING CODE 6714-01-P

[[Page 26081]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.107

[[Page 26082]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.108

[FR Doc. 96-12885 Filed 5-23-96; 8:45 am]
BILLING CODE 6714-01-C

Complete official Federal Register PDF

FR Doc. 96-12884 Assessments; Retention of Existing Assessment Rate Schedule for SAIF-Member Institutions
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26082-26088]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12884]

-----------------------------------------------------------------------

[[Page 26083]]

FEDERAL DEPOSIT INSURANCE CORPORATION
12 CFR Part 327

Assessments; Retention of Existing Assessment Rate Schedule for 
SAIF-Member Institutions

AGENCY: Federal Deposit Insurance Corporation (FDIC).

ACTION: Confirmation of assessment rate.

-----------------------------------------------------------------------

SUMMARY: On May 14, 1996, the Board of Directors of the FDIC (Board) 
adopted a resolution to retain the existing assessment rate schedule 
applicable to members of the Savings Association Insurance Fund (SAIF) 
for the semiannual period beginning July 1, 1996. As a result of this 
action, the SAIF assessment rates to be paid by depository institutions 
whose deposits are subject to assessment by the SAIF will continue to 
range from 23 cents per $100 of assessable deposits to 31 cents per 
$100 of assessable deposits, depending on risk classification.

EFFECTIVE DATE: July 1, 1996, through December 31, 1996.

FOR FURTHER INFORMATION CONTACT: James R. McFadyen, Senior Financial 
Analyst, Division of Research and Statistics, (202) 898-7027; Christine 
E. Blair, Financial Economist, Division of Research and Statistics, 
(202) 898-3936; Christopher L. Hencke, Counsel, Legal Division, (202) 
898-8839; Federal Deposit Insurance Corporation, 550 17th Street NW., 
Washington, D.C., 20429.

SUPPLEMENTARY INFORMATION:

I. Confirmation of Assessment Rate

    Section 7(b) of the Federal Deposit Insurance Act, 12 U.S.C. 
1817(b), provides that the Board shall set semiannual assessments for 
insured depository institutions. For members of the undercapitalized 
SAIF, the Board must set assessment rates to increase the reserve ratio 
of the SAIF to the designated reserve ratio (DRR) of 1.25 percent of 
estimated insured deposits. 12 U.S.C. 1817(b)(2)(A)(i). The Board must 
consider SAIF's expected operating expenses, case resolution 
expenditures and income, the effect of assessments on members' earnings 
and capital, and any other factors that the Board may deem appropriate. 
12 U.S.C. 1817(b)(2)(A)(ii).
    The minimum semiannual assessment for each member is $1,000. 12 
U.S.C. 1817(b)(2)(A)(iii). Moreover, the total amount raised by SAIF 
assessments must not be less than the total amount that would be raised 
by a rate of 18 basis points. 12 U.S.C. 1817(b)(2)(E). The assessment 
revenue is subject to a priority claim by the Financing Corporation 
(FICO). 12 U.S.C. 1817(b)(2)(D).
    In accordance with the statutory requirements above, the Board 
adopted the SAIF assessment rate schedule codified at 12 CFR 
327.9(d)(1). The Board has applied this schedule in previous assessment 
periods as well as the current period from January 1, 1996 through June 
30, 1996. 60 FR 63406 (December 11, 1995). The Board has now decided to 
retain this schedule for the upcoming semiannual period from July 1, 
1996 through December 31, 1996.

II. Basis for Confirmation

    In setting assessment rates, the Board must increase the reserve 
ratio of the SAIF to the DRR of 1.25 percent of estimated insured 
deposits. On December 31, 1995, the SAIF had a balance of nearly $3.4 
billion and a reserve ratio of 0.47 percent of insured deposits, about 
$5.5 billion below the amount needed to meet the DRR. The SAIF reserve 
ratio continues to rise, but the rate of progress is slowed by the 
diversion of assessment revenues to other statutory purposes. Since the 
inception of the SAIF in 1989, these diversions have totaled $7.7 
billion. Without these diversions, the SAIF would be fully capitalized 
today. Some of these demands on the SAIF have been fully satisfied, but 
FICO continues to have an annual draw of up to $793 million against 
SAIF assessments, until 2019.
    The SAIF grew by $1.4 billion in 1995, but a large share of that 
growth--$321 million--stemmed from the reduction in loss reserves for 
anticipated failures. These reductions in loss reserves reflect recent 
improvements in the health of the thrift industry and a decline in 
projected thrift failures. Further reductions in reserves of this 
magnitude will not happen again because the remaining loss reserves are 
now only approximately $111 million.
    At the present pace and under reasonably optimistic conditions, the 
SAIF is not expected to meet the DRR until 2001, which is slightly 
ahead of the capitalization date projected last year. The acceleration 
of the capitalization date is attributable to lower-than-expected loss 
experience in 1995 and the lowering of loss projections for 1996 and 
1997. The thrift industry is healthy today, and no large thrifts are 
expected to fail in the near future. Thrifts earned record profits of 
$7.6 billion in 1995, and the number and assets of ``problem'' thrifts 
continue to decline. Presently, 88 percent of all SAIF members qualify 
for the lowest premium under the FDIC's risk-based assessment system. 
However, it is not known how much longer the present favorable 
conditions can continue, and it would be prudent for the SAIF to be 
fully capitalized as quickly as possible to be prepared for future 
uncertainties.
    The Board has the option of lowering SAIF assessment rates to a 
minimum average annual assessment rate of 18 basis points until January 
1, 1998, at which time rates must return to a minimum average annual 
assessment rate of 23 basis points until the DRR is attained. However, 
the lowering of rates for this 18-month period would delay the SAIF 
from reaching full capitalization and could result in a FICO default in 
1997.
    Other developments have threatened the stability of the SAIF. Given 
the recapitalization of the Bank Insurance Fund (BIF) in 1995, the 
Board subsequently lowered BIF premiums to an average of just 0.3 basis 
points, compared to the average SAIF premium of 23.4 basis points. This 
disparity between BIF and SAIF premiums of about 23 basis points 
provides powerful economic incentives for SAIF-insured institutions to 
reduce their SAIF-assessable deposits. Despite a general ban on 
conversions between insurance funds, thrifts have developed and are 
pursuing means to transfer deposits from SAIF to BIF insurance or 
otherwise reduce their reliance on SAIF-assessable deposits. During 
1995, for example, one large SAIF member shifted an estimated $3.4 
billion in deposits to a BIF-member affiliate, and another thrift took 
advantage of an Oakar accounting anomaly that caused $3.3 billion of 
SAIF deposits to be reclassified as BIF deposits following the sale of 
BIF-insured deposits.
    The migration of deposits out of the SAIF deposit base would 
accelerate the capitalization of the SAIF (see Table 2), but it would 
exacerbate the problems facing the SAIF by reducing the fund's ability 
to diversify its risks. It is likely to be the stronger SAIF members 
that will be successful in shifting deposits to the BIF. As a result, 
weaker thrifts and the banks that own SAIF deposits would be more 
exposed to the losses of an insurance fund that will have a higher risk 
profile.
    If the Board were to lower SAIF assessment rates to 18 basis 
points, it would reduce the premium disparity from 23 basis points to 
18 basis points, but it is unlikely that a temporary reduction of 5 
basis points would temper the existing incentives to reduce reliance on 
SAIF-assessable deposits. Moreover, a reduction in assessment rates, in 
combination with a shrinking assessment base, would hasten a FICO 
shortfall (see Tables 3 and 4).

[[Page 26084]]

    In recommending that SAIF assessment rates remain unchanged, the 
Board has considered the impact on the earnings and capital of SAIF 
members and found no unwarranted adverse effects. As discussed earlier, 
the earnings and capital of SAIF members are satisfactory though the 
Board has recognized that the full impact of the premium disparity may 
not yet be realized.
    Pending enactment of a comprehensive legislative solution to the 
problems facing the SAIF, the FDIC must operate within the existing 
statutory framework. For the reasons discussed above, the Board has 
decided to retain the current SAIF assessment rate schedule of 23 to 31 
basis points in order to enable the SAIF to reach full capitalization 
as quickly as possible. The schedule to be applied for the semiannual 
period from July 1, 1996, through December 31, 1996, is codified at 12 
CFR 327.9(d)(1).

    By order of the Board of Directors.

    Dated at Washington, D.C., this 14th day of May, 1996.

Federal Deposit Insurance Corporation.
Robert E. Feldman,
Deputy Executive Secretary.

BILLING CODE 6714-01-P

[[Page 26085]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.109

[[Page 26086]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.110

[[Page 26087]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.111

[[Page 26088]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.112

[FR Doc. 96-12884 Filed 5-23-96; 8:45 am]
BILLING CODE 6714-01-C

Complete official Federal Register PDF

FR Doc. 96-12843 Periodic Updates to the Pipeline Safety Regulations
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26121-26124]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12843]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Parts 192, 193, and 195

[Docket No. PS-143]
RIN 2137-AC74

Periodic Updates to the Pipeline Safety Regulations

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule updates the references to voluntary 
specifications and standards to reflect more recently published 
editions of each document. This final rule enables pipeline operators 
to utilize current technology, materials, and practices, thereby 
reducing costs and enhancing economic growth. In addition, this final 
rule eliminates the requirements for odorization of hydrogen in 
transmission lines in instances where the hydrogen is intended for use 
as a feedstock in a manufacturing process. This eliminates a 
requirement that is costly, but not needed for safety. This final rule 
is consistent with the President's goals of regulatory reinvention and 
improvement of customer service.

EFFECTIVE DATE: June 24, 1996.

FOR FURTHER INFORMATION CONTACT: Eben M. Wyman, (202) 366-0918, 
regarding the subject matter of this Notice; or the Dockets Unit, (202) 
366-4453, for copies of this final rule or other material in the 
docket.

SUPPLEMENTARY INFORMATION:

Background

    In a March 1995 memorandum, President Clinton directed Federal 
regulatory agencies to, among other things, conduct a page-by-page 
review of all agency regulations, cutting or revising those that were 
obsolete, intrusive, or better handled by parties other than the 
Federal government (i.e., private business, State, or local 
government).
    In response to the President's directive, RSPA issued a Notice of 
Proposed Rulemaking (NPRM) in this docket on March 4, 1996 (61 FR 
8213). The NPRM proposed updating the references to voluntary 
specifications and standards and proposed elimination of the 
requirement to odorize hydrogen transmission pipelines.
    Eight parties submitted written comments on the NPRM.
    Commenters consisted of seven pipeline operators, two of which are 
hydrogen pipeline operators, and a standard setting organization. 
Comments were generally supportive of RSPA's efforts, although some 
commenters made additional suggestions.

Incorporation by Reference

    RSPA is adopting the proposal to incorporate by reference all or 
portions of over 40 different documents containing practices, codes, 
standards, and specifications developed and published by technical 
organizations, including the American Petroleum Institute, American Gas 
Association, American Society of Mechanical Engineers, American Society 
of Civil Engineers, American Concrete Institute, American Society for 
Testing and Materials, International Conference of Building Officials, 
Manufacturers Standardization Society of the Valve and Fittings 
Industry, and National Fire Protection Association. Many editions 
previously referenced in 49 CFR Parts 192, 193, and 195 are out of 
print or obsolete. Later published editions of these documents focus on 
up-to-date technology. Pipeline operators could be unnecessarily 
burdened with design and construction requirements that are referred to 
in earlier editions.
    To avoid these burdens and allow operators to benefit from 
technological improvements in materials and methods, this final rule 
updates those references for which the latest editions have been 
reviewed and accepted by OPS.
    All six commenters on the proposed updates of the voluntary 
consensus standards were supportive of the initiative. However, one 
commenter suggested that the regulatory language in Section 192.63 
should not make reference to the year of the latest edition of the 
standard in order to maintain consistency throughout the regulations. 
RSPA sees merit in this comment, and therefore has revised the final 
rule to cite the standard without reference to the year of the latest 
edition.
    One commenter suggested that RSPA eliminate the use of specific 
editions and dates for the referenced standards and refer instead to 
``the latest edition'' of each standard. This commenter believed that 
in some cases operators are burdened with unnecessary delays and 
additional costs to obtain pipe or components manufactured to an out-
of-date standard.
    RSPA will not adopt this proposal to revise the pipeline safety 
regulations to permanently reference ``the latest edition'' of the 
incorporated consensus standards. Before adopting any updated consensus 
standard RSPA first reviews the standard to determine whether it should 
be incorporated by reference into the regulations. RSPA then proposes 
to accept the document(s) through a Federal Register Notice, providing 
the public with an opportunity to comment on the proposal. It would be 
inconsistent with the Administrative Procedure Act for RSPA to announce 
that the latest editions of these documents will be accepted without 
RSPA review or opportunity for public comment.
    Three commenters suggested that RSPA review the standards at least 
annually. RSPA understands the benefits to operators of periodically 
updating the referenced standards. RSPA will try to revise them 
annually, as this will lessen burdens on pipeline operators.

Requirement to Odorize Hydrogen Transmission Pipelines

    In support of the President's goal to eliminate obsolete and 
unnecessary regulations, this final rule adopts the proposal to amend 
49 CFR 192.625 to eliminate the odorization requirement for hydrogen 
transmission lines in cases where its intended use is as a feedstock in 
a manufacturing process. Hydrogen pipelines that were operating without 
an odorant before May 5, 1975, were

[[Page 26122]]

already exempt from the odorization requirement.
    When used as an industrial feedstock, the hazard from hydrogen 
pipeline leaks is minimal. Hydrogen is much less dense than air and 
thus tends to dissipate rapidly. In addition, hydrogen has relatively 
low energy content for a given volume compared to natural gas. The 
ignition energy of hydrogen is so low that even static electricity can 
ignite the gas, making a build-up of gas to dangerous levels unlikely.
    Moreover, the costs of deodorization are substantial. Odorization 
renders hydrogen unfit for most of its industrial uses, as it can 
reduce the reactivity of catalysts, make the end product unfit for the 
purpose for which it is intended, or reduce the percentage completion 
of a chemical reaction. This means that the odorant needs to be 
removed, an expensive process, prior to its use in manufacture.
    Three commenters discussed RSPA's proposal to eliminate the 
requirements for odorization of hydrogen transmission pipelines. All 
comments were in full support of this initiative, and one commenter 
noted that the revised language in Section 192.625 is consistent with 
the President's goals of RRI, as it ``will serve to effectively 
eliminate a regulatory requirement that is both unnecessary and 
economically burdensome on industry.''

Advisory Committees

    The Technical Pipeline Safety Standards Committee (TPSSC) and the 
Technical Hazardous Liquid Pipeline Safety Standards Committee 
(THLPSSC) have been established by statute to evaluate proposed 
pipeline safety regulations. The committees are required to report on 
the technical feasibility, reasonableness, and practicability of the 
proposals.
    The NPRM was sent by mail to the committees for consideration. The 
proposal was unanimously accepted by 11 members of the THLPSSC. The 
comments of the TPSSC supported the proposal and generally were 
consistent with written comments filed by other commenters discussed 
above. Written comments of the TPSSC were similar, but a few members 
requested further information regarding the hydrogen transmission 
pipelines that would no longer be subject to the odorization 
requirement. A TPSSC member asked where these lines are located, and 
whether they would be tested or surveyed more extensively than other 
pipelines that are required to use odorant.
    The bulk of hydrogen transmission pipelines are operated by two 
companies and are located primarily in Texas and Louisiana. For the 
reasons discussed earlier in this final rule, relieving operators of 
hydrogen pipelines from the odorization requirement will not sacrifice 
safety and thus no additional testing or monitoring is needed.
    Because only 6 members of the TPSSC responded to the mail ballot, 
the TPSSC considered the proposal at its May 7, 1996 meeting. All 
twelve TPSSC members present voted in favor of the proposal.

Corrections

    In the NPRM, RSPA provided an incorrect address for the American 
Society for Testing and Materials (ASTM). The correct town is ``West 
Conshohocken, PA, `` not ``Conshohocken, PA,'' as noted in the NPRM. 
Thus, the correct address for ASTM is 100 Barr Harbor Drive, West 
Conshohocken, PA, 19428. The NPRM also incorrectly named the latest 
edition of NFPA-59A as the 1994 edition. The latest edition is the 1996 
edition. This information is incorporated in the final rule where 
appropriate. Finally, Section 192.189 is corrected to reflect the 
appropriate nomenclature of ANSI/NFPA 70 as the ``National Electrical 
Code,'' not ``National Electric Code'' as named in the NPRM.

Rulemaking Analyses

Executive Order 12866 and DOT Regulatory Policies and Procedures

    This final rule is not a significant regulatory action under 
section 3(f) of Executive Order 12866 and, therefore, was not subject 
to review by the Office of Management and Budget (OMB). The final rule 
is not significant under the Regulatory Policies and Procedures of the 
Department of Transportation (44 FR 11034).

Executive Order 12612

    The final rule has been analyzed with the principles and criteria 
in Executive Order 12612 (``Federalism''), and does not have sufficient 
federalism impacts to warrant the preparation of a federalism 
assessment.

Regulatory Flexibility Act

    Based on the facts available, I certify that this final rule will 
not, have a significant economic impact on a substantial number of 
small entities.

Paperwork Reduction Act

    There are no new information collection requirements in this final 
rule.

List of Subjects

49 CFR Part 192

    Incorporation by reference, Natural gas, Pipeline Safety.

49 CFR Part 193

    Incorporation by reference, Liquefied natural gas (LNG), Pipeline 
safety.

49 CFR Part 195

    Anhydrous ammonia, Carbon dioxide, Incorporation by reference, 
Petroleum, Pipeline safety.

    In consideration of the foregoing, RSPA to amends 49 CFR Parts 192, 
193, and 195 as follows:

PART 192--[AMENDED]

    1. The authority citation for Part 192 continues to read as 
follows:

    Authority: 49 U.S.C. 5103, 60102, 60104, 60108, 60109, 60110, 
60113, 60118; 49 CFR 1.53

    2. Paragraph (a)(1) of section 192.63 is revised to read as 
follows:

Sec. 192.63  Marking of materials.

    (a) * * *
    (1) As prescribed in the specification or standard to which it was 
manufactured, except that thermoplastic fitting must be marked in 
accordance with ASTM D 2513; or
* * * * *
    3. Paragraph (c) of section 192.189 is revised to read as follows:

Sec. 192.189  Vaults: Drainage and waterproofing.

* * * * *
    (c) Electrical equipment in vaults must conform to the applicable 
requirements of Class 1, Group D, of the National Electrical Code, 
ANSI/NFPA 70.
    4. Section 192.625 is amended by revising paragraphs (b)(2)(iv)(C) 
and (b)(3) and by adding paragraph (b)(4) to read as follows:

Sec. 192.625  Odorization of gas.

* * * * *
    (b) * * *
    (2) * * *
    (iv) * * *
    (C) Reduces the percentage completion of a chemical reaction;
    (3) In the case of a lateral line which transports gas to a 
distribution center, at least 50 percent of the length of that line is 
in a Class 1 or Class 2 location; or
    (4) The combustible gas is hydrogen intended for use as a feedstock 
in a manufacturing process.
* * * * *
    5. Appendix A of Part 192 is amended by revising paragraphs I. D, 
II. A (1), (3)

[[Page 26123]]

and (4), II. B, II. C (3)-(6), and II. E to read as follows:

Appendix A to Part 192--Incorporated by Reference

    I. List of organizations and addresses.
* * * * *
    D. American Society for Testing and Materials (ASTM), 100 Barr 
Harbor Drive, West Conshohocken, PA 19428.
* * * * *
    II. Documents incorporated by reference. (Numbers in parentheses 
indicate applicable editions.)
    A. * * *
    (1) API Specification 5L ``Specification for Line Pipe (41st 
edition, 1995).
* * * * *
    (3) API Specification 6D ``Specification for Pipeline Valves 
(Gate, Plug, Ball, and Check Valves)'' (21st edition, 1994).
    (4) API Standard 1104 ``Welding of Pipelines and Related 
Facilities'' (18th edition, 1994).
    B. American Society for Testing and Materials (ASTM):
    (1) ASTM Designation: A53 ``Standard Specification for Pipe, 
Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless'' 
(A53-95a).
    (2) ASTM Designation A 106 ``Standard Specification for Seamless 
Carbon Steel Pipe for High-Temperature Service'' (A 106- 94a).
    (3) ASTM Designation: A 333/A 333M ``Standard Specification for 
Seamless and Welded Steel Pipe for Low-Temperature Service'' (A 333/
A 333M-94).
    (4) ASTM Designation: A 372/A 372M ``Standard Specification for 
Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels'' 
(A 372/A 372M-95).
    (5) ASTM Designation: A 381 ``Standard Specification for Metal-
Arc-Welded Steel Pipe for Use With High-Pressure Transmission 
Systems (A 381-93).
    (6) ASTM Designation: A 671 ``Standard Specification for 
Electric-Fusion-Welded Steel Pipe for Atmospheric and Lower 
Temperatures'' (A 671-94).
    (7) ASTM Designation: A 672 ``Standard Specification for 
Electric-Fusion-Welded Steel Pipe for High-Pressure Service at 
Moderate Temperatures'' (A 672-94).
    (8) ASTM Designation A 691 ``Standard Specification for Carbon 
and Alloy Steel Pipe, Electric-Fusion-Welded for High- Pressure 
Service at High Temperatures'' (A 691-93).
    (9) ASTM Designation D 638 ``Standard Test Method for Tensile 
Properties of Plastics'' (D 638-95).
    (10) ASTM Designation D 2513 ``Standard Specification for 
Thermoplastic Gas Pressure Pipe, Tubing and Fittings'' (D 2513-87 
edition for Sec. 192.63(a)(1), otherwise D2513-95c).
    (11) ASTM Designation D 2517 ``Standard Specification for 
Reinforced Epoxy Resin Gas Pressure Pipe and Fittings'' (D 2517-94).
    C. * * *
    (3) ASME Boiler and Pressure Vessel Code, Section I ``Power 
Boilers'' (1995 edition with 1995 Addenda).
    (4) ASME Boiler and Pressure Vessel Code, Section VIII, Division 
1 ``Pressure Vessels'' (1995 edition with 1995 Addenda).
    (5) ASME Boiler and Pressure Vessel Code, Section VIII, Division 
2 ``Pressure Vessels: Alternative Rules'' (1995 edition with 1995 
Addenda).
    (6) ASME Boiler and Pressure Vessel Code, Section IX ``Welding 
and Brazing Qualifications'' (1995 edition with 1995 Addenda).
* * * * *
    E. National Fire Protection Association (NFPA):
    (1) ANSI/NFPA 30 ``Flammable and Combustible Liquids Code'' 
(1993).
    (2) ANSI/NFPA 58 ``Standard for the Storage and Handling of 
Liquefied Petroleum Gases'' (1995).
    (3) ANSI/NFPA 59 ``Standard for the Storage and Handling of 
Liquefied Petroleum Gases at Utility Gas Plants'' (1995).
    (4) ANSI/NFPA 70 ``National Electrical Code'' (1996).

PART 193--[AMENDED]

    1. The authority citation for Part 193 continues to read as 
follows:

    Authority: 49 U.S.C. 5103, 60102, 60103, 60104, 60108, 60109, 
60110, 60113, 60118; 49 CFR 1.53

    2. Appendix A to Part 193 is amended by revising paragraphs II. C, 
II D (1) and (3), II. E, II. F, and II. G, to read as follows:

Appendix A to Part 193--Incorporation by Reference

* * * * *
    II. Documents Incorporated by Reference. (Numbers in Parentheses 
Indicate Applicable Editions.)
* * * * *
    C. American Society of Civil Engineers (ASCE):
    1. ASCE 7-95 ``Minimum Design Loads for Buildings and Other 
Structures'' (1995)
    D. * * *
    1. API Specification 6D ``Specification for Pipeline Valves 
(Gate, Plug, Ball, and Check Valves)'' (21st edition, 1994).
    2. * * *
    3. API Standard 1104 ``Welding of Pipelines and Related 
Facilities'' (18th edition, 1994).
    E. American Society of Mechanical Engineers (ASME):
    1. ASME/ANSI B31.3 ``Chemical Plant and Petroleum Refinery 
Piping'' (1993 edition with ASME/ANSI B31.3a-1993, B31.b-1994 and 
B31.c-1995 Addenda).
    2. ASME/ANSI B31.5 ``Refrigeration Piping'' (1992 edition with 
ASME B31.5a-1994 Addenda).
    3. ASME/ANSI B31.8 ``Gas Transmission and Distribution Piping 
Systems'' (1995).
    4. ASME Boiler and Pressure Vessel Code, Section I ``Power 
Boilers'' (1995 edition with 1995 Addenda).
    5. ASME Boiler and Pressure Vessel Code, Section IV, ``Heating 
Boilers'' (1995 edition with 1995 Addenda).
    6. ASME Boiler and Pressure Vessel Code, Section VIII, Division 
1 ``Pressure Vessels'' (1995 edition with 1995 Addenda).
    7. ASME Boiler and Pressure Vessel Code, Section VIII, Division 
2, ``Pressure Vessels: Alternative Rules'' (1995 edition with 1995 
Addenda).
    8. ASME Boiler and Pressure Vessel Code, Section IX, ``Welding 
and Brazing Qualifications'' (1995 edition with 1995 Addenda).
    F. International Conference of Building Officials (ICBU):
    1. ``Uniform Building Code'' (UBC) (1994).
    G. National Fire Protection Association (NFPA):
    1. ANSI/NFPA 30 ``Flammable and Combustible Liquids Code'' 
(1993)
    2. ANSI/NFPA 37 ``Standard for the Installation and Use of 
Stationary Combustion Engines and Gas Turbines'' (1994).
    3. ANSI/NFPA 51B ``Standard for Fire Prevention in Use of 
Cutting and Welding Processes'' (1994).
    4. ANSI/NFPA 59A ``Standard for the Production, Storage, and 
Handling of Liquefied Natural Gas (LNG)'' (1972 edition for 
Sec. 193.2005(c), otherwise 1996 edition).
    5. ANSI/NFPA 70 ``National Electrical Code'' (1996).
* * * * *

PART 195--[AMENDED]

    1. The authority citation for Part 195 continues to read as 
follows:

    Authority: 49 U.S.C. 5103, 60102, 60104, 60108, 60109, 60118; 49 
CFR 1.53.

    2. Section 195.3 is amended by revising paragraph (b)(6) and 
paragraphs (c) introductory text and (c) (2) through (5) to read as 
follows:

195.3  Matter incorporated by reference.

* * * * *
    (b) * * *
    (6) American Society for Testing and Materials (ASTM), 100 Barr 
Harbor Drive, Conshohocken, PA 19428.
* * * * *
    (c) The full title for the publications incorporated by reference 
in this part are as follows. Numbers in parentheses indicate applicable 
editions:
* * * * *
    (2) American Petroleum Institute (API):
    (i) API Specification 5L ``Specification for Line Pipe'' (41st 
edition, 1995).
    (ii) API Specification 6D ``Specification for Pipeline Valves 
(Gate, Plug, Ball, and Check Valves)'' (21st Edition, 1994).
    (iii) API Specification 1104 ``Welding of Pipelines and Related 
Facilities'' (18th edition, 1994).
    (3) American Society of Mechanical Engineers (ASME):
    (i) ASME/ANSI B16.9 ``Factory-Made Wrought Steel Buttwelding 
Fittings'' (1993).

[[Page 26124]]

    (ii) ASME/ANSI B31.4 ``Liquid Transportation Systems for 
Hydrocarbons, Liquid Petroleum Gas, Anhydrous Ammonia, and Alcohols'' 
(1992 edition with ASME B31.4a-1994 Addenda).
    (iii) ASME/ANSI B31.8 ``Gas Transmission and Distribution Piping 
Systems'' (1995)
    (iv) ASME/ANSI B31G ``Manual for Determining the Remaining Strength 
of Corroded Pipelines'' (1991).
    (v) ASME Boiler and Pressure Vessel Code, Section VIII, Division 1 
``Pressure Vessels'' (1995 edition with 1995 Addenda).
    (vi) ASME Boiler and Pressure Vessel Code, Section IX ``Welding and 
Brazing Qualifications'' (1995 edition with 1995 Addenda).
    (4) Manufacturers Standardization Society of the Valve and Fittings 
Industry, Inc. (MSS):
    (i) MSS SP-75 ``Specification for High Test Wrought Butt Welding 
Fittings'' (1993).
    (ii) [Reserved]
    (5) American Society for Testing and Materials (ASTM):
    (i) ASTM Designation: A 53 ``Standard specification for Pipe, 
Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless'' (A 53-
95a).
    (ii) ASTM Designation: A 106 ``Standard Specification for Seamless 
Carbon Steel Pipe for High-Temperature Service'' (A 106-94a).
    (iii) ASTM Designation: A 333/A 333M ``Standard Specification for 
Seamless and Welded Steel Pipe for Low-Temperature Service''(A 333/A 
333M-94).
    (iv) ASTM Designation: A 381 ``Standard Specification for Metal-
Arc-Welded Steel Pipe for Use With High-Pressure Transmission Systems'' 
(A 381-93).
    (v) ASTM Designation: A 671 ``Standard Specification for Electric-
Fusion-Welded Steel Pipe for Atmospheric and Lower Temperatures'' (A 
671-94).
    (vi) ASTM Designation: A 672 ``Standard Specification for Electric-
Fusion-Welded Steel Pipe for High-Pressure Service at Moderate 
Temperatures'' (A 672-94).
    (vii) ASTM Designation: A 691 ``Standard Specification for Carbon 
and Alloy Steel Pipe Electric-Fusion-Welded for High- Pressure Service 
at High Temperatures'' (A 691-93).

    Issued in Washington, DC on May 16, 1996.
Rose A. McMurray,
Acting Deputy Administrator.
[FR Doc. 96-12843 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-60-P

Complete official Federal Register PDF

FR Doc. 96-12834 RUS Specification for Aerial Service Wires
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26073-26078]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12834]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Rural Utilities Service

7 CFR Part 1755

RUS Specification for Aerial Service Wires

AGENCY: Rural Utilities Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Rural Utilities Service (RUS) amends its regulations on 
Telecommunications Standards and Specifications for Materials, 
Equipment and Construction, by codifying the RUS Specification for 
Aerial Service Wires. The new specification sets forth the engineering 
and technical standards that are required by RUS in outside plant 
environments.

DATES: Effective date: June 24, 1996.
    Compliance date: Borrowers may purchase aerial wire service 
products already produced or currently in the process of manufacturing 
under previous Bulletin 345-36 until February 24, 1997.
    Incorporation by reference: Incorporation by reference of certain 
publications listed in this final rule is approved by the Director of 
the Federal Register as of June 24, 1996.

FOR FURTHER INFORMATION CONTACT: Charlie I. Harper, Jr., Chief, Outside 
Plant Branch, Telecommunications Standards Division, Rural Utilities 
Service, room 2844, AG Box 1598, South Building, U.S. Department of 
Agriculture, Washington, DC 20250-1598, telephone number (202) 720-
0667.

SUPPLEMENTARY INFORMATION:

Executive Order 12866

    This final rule has been determined to be not significant and 
therefore has not been reviewed by the Office of Management and Budget.

Executive Order 12778

    This final rule has been reviewed under Executive Order 12778, 
Civil Justice Reform. If adopted, this final rule will not:
    (1) Preempt any State or local laws, regulations, or policies;
    (2) Have any retroactive effect; and
    (3) Require administrative proceedings before parties may file suit 
challenging the provisions of this rule.

Regulatory Flexibility Act Certification

    The Administrator of RUS has determined that this final rule will 
not have a significant economic impact on a substantial number of small 
entities, as defined by the Regulatory Flexibility Act (5 U.S.C. 601 et 
seq.). This final rule involves standards and specifications, which may 
increase the direct short-term costs to RUS borrowers. However, the 
long-term direct economic costs are reduced through greater durability 
and lower maintenance cost over time.

Information Collection and Recordkeeping Requirements

    The reporting and recordkeeping requirements contained in the final 
rule were approved by the Office of Management and Budget (OMB) 
pursuant to the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35, 
as amended) under control number of 0572-0059.
    Send questions or comments regarding this burden or any other 
aspect of these collections of information, including suggestions for 
reducing the burden, to F. Lamont Heppe, Jr., Deputy Director, Program 
Support Staff, Rural Utilities Service, Ag Box 1522, Washington, DC 
20250-1522.

[[Page 26074]]

National Environmental Policy Act Certification

    The Administrator of RUS has determined that this final rule will 
not significantly affect the quality of the human environment as 
defined by the National Environmental Policy Act of 1969 (42 U.S.C. 
4321 et seq.) Therefore, this action does not require an environmental 
impact statement or assessment.

Catalog of Federal Domestic Assistance

    The program described by this final rule is listed in the Catalog 
of Federal Domestic Assistance programs under No. 10.851, Rural 
Telephone Loans and Loan Guarantees; and No. 10.852, Rural Telephone 
Bank Loans. This catalog is available on a subscription basis from the 
Superintendent of Documents, the United States Government Printing 
Office, Washington, DC 20402.

Executive Order 12372

    This final rule is excluded from the scope of Executive Order 
12372, Intergovernmental Consultation, which may require consultation 
with State and local officials. A Notice of Final Rule titled 
Department Programs and Activities Excluded from Executive Order 12372 
(50 FR 47034) exempts RUS and RTB loans and loan guarantees, and RTB 
bank loans, to governmental and nongovernmental entities from coverage 
under this Order.

Background

    RUS issues publications titled ``Bulletin'' which serve to guide 
borrowers regarding already codified policy, procedures, and 
requirements needed to manage loans, loan guarantee programs, and the 
security instruments which provide for and secure RUS financing. RUS 
issues standards and specifications for the construction of telephone 
facilities financed with RUS loan funds. RUS Bulletin 345-36, ``RUS 
Specification for Parallel Conductor Drop Wire,'' PE-7, dated January 
25, 1983, presently contains the engineering and technical requirements 
for aerial service wires that are considered necessary for satisfactory 
performance in outside plant environments. Because of the technological 
advancements made in aerial service wire designs over the past eleven 
years, RUS is rescinding Bulletin 345-36 and codifying these standards 
in 7 CFR part 1755.700 through 7 CFR part 1755.704, RUS Specification 
for Aerial Service Wires.
    The specification allows aerial service wire designs consisting of 
one pair through six pairs. The specification also allows aerial 
service wire designs containing copper coated steel and nonmetallic 
reinforcing members.
    The specification contains mechanical, electrical, and 
environmental requirements, and test methods for evaluation of these 
aerial service wire designs.
    This action establishes RUS requirements for a wider range of 
aerial service wires without affecting current designs or manufacturing 
techniques. This wider selection of aerial service wires will afford 
RUS telephone borrowers the opportunity to increase subscriber services 
in an economical and efficient manner through enhanced wire designs 
brought about by technological advancements made during the past eleven 
years.
    On December 29, 1995, RUS published a proposed rule (60 FR 67340) 
to codify the RUS Specification for Aerial Service Wires. Comments on 
this proposed rule were due January 29, 1996. No comments were received 
by this due date.

List of Subjects in 7 CFR Part 1755

    Incorporation by reference, Loan programs--communications, 
Reporting and recordkeeping requirements, Rural areas, Telephone.

    For the reasons set out in the preamble, RUS amends chapter XVII of 
title 7 of the Code of Federal Regulations as follows:

PART 1755--TELECOMMUNICATIONS STANDARDS AND SPECIFICATIONS FOR 
MATERIALS, EQUIPMENT AND CONSTRUCTION

    1. The authority citation for part 1755 continues to read as 
follows:

    Authority: 7 U.S.C. 901 et seq., 1921 et seq., 6941 et seq.

    2. Section 1755.98 is amended by adding a new entry to the table in 
numerical order to read as follows:

Sec. 1755.98  List of telephone standards and specifications included 
in other 7 CFR parts.

* * * * *

--------------------------------------------------------------------------------------------------------------------------------------------------------
               Section                                 Issue date                                                  Title                                
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                   *                  *                  *                  *                  *                  *                  *                  
1755.700 through 1755.704............  June 24, 1996.............................  RUS Specification for Aerial Service Wires.                          
                                                                                                                                                        
                                                                                                                                                        
                   *                  *                  *                  *                  *                  *                  *                  
--------------------------------------------------------------------------------------------------------------------------------------------------------

    3. Sections 1755.700 through 1755.704 are added to read as follows:

Sec. 1755.700  RUS specification for aerial service wires.

    Secs. 1755.701 through 1755.704 cover the requirements for aerial 
service wires.

Sec. 1755.701  Scope.

    (a) This section covers the requirements for aerial service wires 
intended for aerial subscriber drops.
    (b) The aerial service wires can be either copper coated steel 
reinforced or nonmetallic reinforced designs.
    (c) For the copper coated steel reinforced design, the reinforcing 
members are the conductors.
    (1) The conductors are solid copper-covered steel wires.
    (2) The wire structure is completed by insulating the conductors 
with an overall extruded plastic insulating compound.
    (d) For the nonmetallic reinforced design, the conductors are solid 
copper individually insulated with an extruded solid insulating 
compound.
    (1) The insulated conductors are either laid parallel (two 
conductor design only) or twisted into pairs (a star-quad configuration 
is permitted for two pair wires).
    (2) The wire structure is completed by the application of 
nonmetallic reinforcing members and an overall plastic jacket.
    (e) All wires sold to RUS borrowers for projects involving RUS loan 
funds under Secs. 1755.700 through 1755.704 must be accepted by RUS 
Technical Standards Committee ``A'' (Telecommunications). For wires 
manufactured to the specification of Secs. 1755.700 through 1755.704, 
all design changes to an accepted design must be submitted for 
acceptance. RUS will be the sole authority on what constitutes a design 
change.
    (f) Materials, manufacturing techniques, or wire designs not

[[Page 26075]]

specifically addressed by Secs. 1755.700 through 1755.704 may be 
allowed if accepted by RUS. Justification for acceptance of modified 
materials, manufacturing techniques, or wire designs must be provided 
to substantiate product utility and long term stability and endurance.

Sec. 1755.702  Copper coated steel reinforced (CCSR) aerial service 
wire.

    (a) Conductors. (1) Each conductor shall comply with the 
requirements specified in the American National Standard Institute/
Insulated Cable Engineers Association, Inc. (ANSI/ICEA) S-89-648-1993, 
paragraphs 2.1 through 2.1.5. The ANSI/ICEA S-89-648-1993 Standard For 
Telecommunications Aerial Service Wire, Technical Requirements 
(approved by ANSI July 11, 1994) is incorporated by reference in 
accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of ANSI/ICEA 
S-89-648-1993 are available for inspection during normal business hours 
at RUS, room 2845, U.S. Department of Agriculture, Washington, DC 
20250-1500 or at the Office of the Federal Register, 800 North Capitol 
Street, NW., suite 700, Washington, DC. Copies are available from ICEA, 
P. O. Box 440, South Yarmouth, MA 02664, telephone number (508) 394-
4424.
    (2) Factory joints in conductors shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 2.1.6.
    (b) Conductor insulation. (1) The raw materials used for the 
conductor insulation shall comply with the requirements specified in 
ANSI/ICEA S-89-648-1993, paragraph 3.1.1.
    (2) The raw materials shall be accepted by RUS prior to their use.
    (3) The finished conductor insulation shall be free from holes, 
splits, blisters, or other imperfections and shall be as smooth as is 
consistent with best commercial practice.
    (4) The finished conductor insulation shall comply with the 
requirements specified in ANSI/ICEA S-89-648-1993, paragraphs 3.1.5 
through 3.1.5.4.
    (5) The insulation shall have a minimum spot thickness of not less 
than 0.9 millimeters (mm) (0.03 inches (in.)) at any point.
    (c) Wire assembly. (1) The two conductors shall be insulated in 
parallel to form an integral configuration.
    (2) The finished wire assembly shall be either a flat or a notched 
oval. Other finished wire assemblies may be used provided that they are 
accepted by RUS prior to their use.
    (3) The overall dimensions of the finished wire assembly shall be 
in accordance with the following requirements:

------------------------------------------------------------------------
                                                    Dimensions          
                                         -------------------------------
                Diameter                    Minimum  mm     Maximum  mm 
                                               (in.)           (in.)    
------------------------------------------------------------------------
Major...................................      5.5 (0.22)      8.0 (0.31)
Minor...................................      3.0 (0.12)      5.0 (0.19)
------------------------------------------------------------------------

    (d) Conductor marking. The insulated conductors of a finished wire 
shall be marked in accordance with the requirements specified in ANSI/
ICEA S-89-648-1993, paragraph 3.1.4.
    (e) Electrical requirements. (1) Conductor resistance. The direct 
current (dc) resistance of each conductor in a completed CCSR aerial 
service wire shall comply with the requirement specified in ANSI/ICEA 
S-89-648-1993, paragraph 7.1.2.
    (2) Wet mutual capacitance. The wet mutual capacitance of the 
completed CCSR aerial service wire shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 7.1.3.
    (3) Wet attenuation. The wet attenuation of the completed CCSR 
aerial service wire shall comply with the requirement specified in 
ANSI/ICEA S-89-648-1993, paragraph 7.1.4.
    (4) Wet insulation resistance. The wet insulation resistance of the 
completed CCSR aerial service wire shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 7.1.5.
    (5) Dielectric strength. (i) The wet dielectric strength between 
conductors and between each conductor of the completed CCSR aerial 
service wire and the surrounding water shall comply with the 
requirement specified in ANSI/ICEA S-89-648-1993, paragraph 7.1.6.
    (ii) The dry dielectric strength between conductors of the 
completed CCSR aerial service wire shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 7.1.7.
    (6) Fusing coordination. The completed CCSR aerial service wire 
shall comply with the fusing coordination requirement specified in 
ANSI/ICEA S-89-648-1993, paragraph 7.1.8.
    (7) Insulation imperfections. Each length of completed CCSR aerial 
service wire shall comply with the requirement specified in ANSI/ICEA 
S-89-648-1993, paragraph 7.1.9.
    (f) Mechanical requirements. (1) Impact test. (i) All CCSR aerial 
service wires manufactured in accordance with this section shall comply 
with the unaged impact test specified in ANSI/ICEA S-89-648-1993, 
paragraph 8.1.2.
    (ii) All CCSR aerial service wires manufactured in accordance with 
this section shall comply with the aged impact test specified in ANSI/
ICEA S-89-648-1993, paragraph 8.1.3.
    (2) Abrasion resistance test. All CCSR aerial service wires 
manufactured in accordance with this section shall comply with the 
abrasion resistance test specified in ANSI/ICEA S-89-648-1993, 
paragraph 8.1.4.
    (3) Static load test. All CCSR aerial service wires manufactured in 
accordance with this section shall comply with the static load test 
specified in ANSI/ICEA S-89-648-1993, paragraph 8.1.5.
    (4) Plasticizer compatibility test. All CCSR aerial service wires 
manufactured in accordance with this section shall comply with the 
plasticizer compatibility test specified in ANSI/ICEA S-89-648-1993, 
paragraph 8.1.8.
    (g) Environmental requirements. (1) Cold temperature handling test. 
(i) All CCSR aerial service wires manufactured in accordance with this 
section shall comply with the unaged cold temperature handling test 
specified in ANSI/ICEA S-89-648-1993, paragraph 8.2.1.
    (ii) All CCSR aerial service wires manufactured in accordance with 
this section shall comply with the aged cold temperature handling test 
specified in ANSI/ICEA S-89-648-1993, paragraph 8.2.2.
    (2) Light absorption test. All CCSR aerial service wires 
manufactured in accordance with this section shall comply with the 
light absorption test specified in ANSI/ICEA S-89-648-1993, paragraph 
8.2.3.
    (3) Low temperature separation test. All CCSR aerial service wires 
manufactured in accordance with this section shall comply with the low 
temperature separation test specified in ANSI/ICEA S-89-648-1993, 
paragraph 8.2.4.
    (4) Flammability test. All CCSR aerial service wires manufactured 
in accordance with this section shall comply with the flammability test 
specified in ANSI/ICEA S-89-648-1993, paragraph 8.3.
    (5) Wire listing. All CCSR aerial service wires manufactured in 
accordance with this section shall comply with the listing requirements 
specified in ANSI/ICEA S-89-648-1993, paragraph 8.4.
    (h) Identification marker. Each length of CCSR aerial service wire 
shall be identified in accordance with ANSI/ICEA S-89-648-1993, 
paragraph 9.1.4. When surface marking is employed, the color of the 
initial marking shall be either white or silver.
    (i) Length marking (optional). (1) Sequentially numbered length 
marking of the completed CCSR aerial service

[[Page 26076]]

wire may be used at the option of the manufacturer unless specified by 
the end user.
    (2) When sequentially numbered length markings are used, the length 
markings shall be in accordance with ANSI/ICEA S-89-648-1993, paragraph 
9.1.5. The color of the initial marking shall be either white or 
silver.
    (j) Durability of marking. The durability of the marking of the 
CCSR aerial service wire shall comply with the requirements specified 
in ANSI/ICEA S-89-648-1993, paragraph 9.1.6.

Sec. 1755.703   Nonmetallic reinforced (NMR) aerial service wire.

    (a) Conductors. (1) Each conductor shall comply with the 
requirements specified in ANSI/ICEA S-89-648-1993, paragraphs 2.2 and 
2.2.1. The ANSI/ICEA S-89-648-1993 Standard For Telecommunications 
Aerial Service Wire, Technical Requirements (approved by ANSI July 11, 
1994) is incorporated by reference in accordance with 5 U.S.C. 552(a) 
and 1 CFR part 51. Copies of ANSI/ICEA S-89-648-1993 are available for 
inspection during normal business hours at RUS, room 2845, U.S. 
Department of Agriculture, Washington, DC 20250-1500 or at the Office 
of the Federal Register, 800 North Capitol Street, NW., suite 700, 
Washington, DC. Copies are available from ICEA, P. O. Box 440, South 
Yarmouth, MA 02664, telephone number (508) 394-4424.
    (2) Factory joints made in the conductors during the manufacturing 
process shall comply with the requirement specified in ANSI/ICEA S-89-
648-1993, paragraph 2.2.2.
    (b) Conductor insulation. (1) The raw materials used for the 
conductor insulation shall comply with the requirements specified in 
ANSI/ICEA S-89-648-1993, paragraphs 3.2 through 3.2.2.
    (2) The finished conductor insulation shall comply with the 
requirements specified in ANSI/ICEA S-89-648-1993, paragraph 3.2.3.
    (3) The dimensions of the insulated conductors shall comply with 
the requirements specified in ANSI/ICEA S-89-648-1993, paragraph 
3.2.3.1.
    (4) The colors of the insulation shall comply with the requirements 
specified in ANSI/ICEA S-89-648-1993, paragraph 3.2.3.2.
    (5) A permissible overall performance level of faults in conductor 
insulation shall comply with the requirement specified in ANSI/ICEA S-
89-648-1993, paragraph 3.2.4.6. The length count and number of faults 
shall be recorded. The information shall be retained for a period of 6 
months and be available for review by RUS when requested.
    (6) Repairs to the conductor insulation during manufacture are 
permissible. The method of repair shall be accepted by RUS prior to its 
use. The repaired insulation shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 3.2.3.3.
    (7) All repaired sections of insulation shall be retested in the 
same manner as originally tested for compliance with paragraph (b)(5) 
of this section.
    (8) The colored insulating material removed from or tested on the 
conductor, from a finished wire shall comply with the requirements 
specified in ANSI/ICEA S-89-648-1993, paragraphs 3.2.4 through 3.2.4.5.
    (c) Identification of pairs and layup of pairs. (1) The insulation 
shall be colored coded to identify:
    (i) The tip and ring conductor of each pair; and
    (ii) Each pair in the completed wire.
    (2) The colors to be used in the pairs together with the pair 
numbers shall be in accordance with the table specified in ANSI/ICEA S-
89-648-1993, paragraph 4.1.1.
    (3) The insulated conductors shall be either layed parallel (two 
conductor design only) or twisted into pairs.
    (4) When using parallel conductors for the two conductor design, 
the parallel conductors shall be designed to enable the wire to meet 
the electrical requirements specified in paragraph (g) of this section.
    (5) When twisted pairs are used, the following requirements shall 
be met:
    (i) The pair twists shall be designed to enable the wire to meet 
the electrical requirements specified in paragraph (g) of this section; 
and
    (ii) The average length of pair twists in any pair in the finished 
wire, when measured on any 3 meter (10 foot) length, shall not exceed 
the requirement specified in ANSI/ICEA S-89-648-1993, paragraph 4.1.
    (6) An alternative method of forming the two-pair wire is the use 
of a star-quad configuration.
    (i) The assembly of the star-quad shall be such as to enable the 
wire to meet the electrical requirements specified in paragraph (g) of 
this section.
    (ii) The star-quad configuration shall be assembled in accordance 
with ANSI/ICEA S-89-648-1993, paragraph 4.1.2.
    (iii) The average length of twist for the star-quad in the finished 
wire, when measured on any 3 meter (10 foot) length, shall not exceed 
the requirement specified in ANSI/ICEA S-89-648-1993, paragraph 4.1.
    (iv) The color scheme used to provide identification of the tip and 
ring conductors of each pair in the star-quad shall comply with the 
table specified in ANSI/ICEA S-89-648-1993, paragraph 4.1.2.
    (d) Strength members. The strength members shall comply with the 
requirements specified in ANSI/ICEA S-89-648-1993, paragraphs 6.1 and 
6.1.1.
    (e) Wire jacket. (1) The jacket shall comply with the requirements 
specified in ANSI/ICEA S-89-648-1993, paragraphs 5.1 and 5.1.1.
    (2) The jacket raw materials shall be accepted by RUS prior to 
their use.
    (f) Wire assembly. The finished wire assembly shall be in 
accordance with ANSI/ICEA S-89-648-1993, paragraph 5.1.3 and Figure 5-
1.
    (g) Electrical requirements. (1) Conductor resistance. The dc 
resistance of each conductor in a completed NMR aerial service wire 
shall comply with the requirement specified in ANSI/ICEA S-89-648-1993, 
paragraph 7.2.2.
    (2) Resistance unbalance. (i) The dc resistance unbalance between 
the two conductors of any pair in a completed NMR aerial service wire 
and the average resistance unbalance of all pairs in a Quality Control 
Lot shall comply with the requirements specified in ANSI/ICEA S-89-648-
1993, paragraph 7.2.3.
    (ii) The resistance unbalance between tip and ring conductors shall 
be random with respect to the direction of unbalance. That is, the 
resistance of the tip conductors shall not be consistently higher with 
respect to the ring conductors and vice versa.
    (3) Dry mutual capacitance. The dry mutual capacitance of the 
completed NMR aerial service wire shall comply with the requirements 
specified in ANSI/ICEA S-89-648-1993, paragraph 7.2.4, Type 1.
    (4) Pair-to-pair capacitance unbalance. The pair-to-pair 
capacitance unbalance as measured on the completed NMR aerial service 
wire shall comply with the requirements specified in ANSI/ICEA S-89-
648-1993, paragraph 7.2.5.
    (5) Attenuation. (i) The dry attenuation of the completed NMR 
aerial service wire shall comply with the requirement specified in 
ANSI/ICEA S-89-648-1993, paragraph 7.2.7.
    (ii) The wet attenuation of the completed NMR aerial service wire 
shall comply with the requirement specified in ANSI/ICEA S-89-648-1993, 
paragraph 7.2.8.
    (6) Insulation resistance. (i) The dry insulation resistance of the 
completed NMR aerial service wire shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 7.2.9.

[[Page 26077]]

    (ii) The wet insulation resistance of the completed NMR aerial 
service wire shall comply with the requirement specified in ANSI/ICEA 
S-89-648-1993, paragraph 7.2.10.
    (7) Wet Dielectric strength. The wet dielectric strength between 
conductors and between each conductor of the completed NMR aerial 
service wire and the surrounding water shall comply with the 
requirement specified in ANSI/ICEA S-89-648-1993, paragraph 7.2.11.
    (8) Fusing coordination. The completed NMR aerial service wire 
shall comply with the fusing coordination requirement specified in 
ANSI/ICEA S-89-648-1993, paragraph 7.2.13.
    (9) Crosstalk loss. (i) The output-to-output far-end crosstalk loss 
(FEXT) for any pair of completed NMR aerial service wire shall comply 
with the requirement specified in ANSI/ICEA S-89-648-1993, paragraph 
7.2.14.
    (ii) The input-to-input near-end crosstalk loss (NEXT) for any pair 
of completed NMR aerial service wire shall comply with the requirement 
specified in ANSI/ICEA S-89-648-1993, paragraph 7.2.14.
    (h) Mechanical requirements--(1) Impact test. (i) All NMR aerial 
service wires manufactured in accordance with this section shall comply 
with the unaged impact test specified in Sec. 1755.702(f)(1)(i).
    (ii) All NMR aerial service wires manufactured in accordance with 
this section shall comply with the aged impact test specified in 
Sec. 1755.702(f)(1)(ii).
    (2) Abrasion resistance test. All NMR aerial service wires 
manufactured in accordance with this section shall comply with the 
abrasion resistance test specified in Sec. 1755.702(f)(2).
    (3) Static load test. All NMR aerial service wires manufactured in 
accordance with this section shall comply with the static load test 
specified in Sec. 1755.702(f)(3).
    (4) Elongation test. All NMR aerial service wires manufactured in 
accordance with this section shall comply with the elongation test 
specified in ANSI/ICEA S-89-648-1993, paragraph 8.1.7.
    (5) Plasticizer compatibility test. All NMR aerial service wires 
manufactured in accordance with this section shall comply with the 
plasticizer compatibility test specified in Sec. 1755.702(f)(4).
    (i) Environmental requirements. (1) Cold temperature handling test. 
(i) All NMR aerial service wires manufactured in accordance with this 
section shall comply with the unaged cold temperature handling test 
specified in Sec. 1755.702(g)(1)(i).
    (ii) All NMR aerial service wires manufactured in accordance with 
this section shall comply with the aged cold temperature handling test 
specified in Sec. 1755.702(g)(1)(ii).
    (2) Light absorption test. All NMR aerial service wires 
manufactured in accordance with this section shall comply with the 
light absorption test specified in Sec. 1755.702(g)(2).
    (3) Flammability test. All NMR aerial service wires manufactured in 
accordance with this section shall comply with the flammability test 
specified in Sec. 1755.702(g)(4).
    (4) Wire listing. All NMR aerial service wires manufactured in 
accordance with this section shall comply with the listing requirements 
specified in Sec. 1755.702(g)(5).
    (j) Ripcord (optional). (1) A ripcord may be used in the NMR aerial 
service wire structure at the option of the manufacturer unless 
specified by the end user.
    (2) When a ripcord is used it shall comply with the requirements 
specified in ANSI/ICEA S-89-648-1993, paragraphs 4.2 through 4.2.3.
    (k) Identification marker. Each length of NMR aerial service wire 
shall be identified in accordance with ANSI/ICEA S-89-648-1993, 
paragraphs 9.1 through 9.1.4. When surface marking is employed, the 
color of the initial marking shall be either white or silver.
    (l) Length marking (optional). (1) Sequentially numbered length 
marking of the completed NMR aerial service wire may be used at the 
option of the manufacturer unless specified by the end user.
    (2) When sequentially numbered length markings are used, the length 
markings shall be in accordance with in accordance with 
Sec. 1755.702(i)(2).
    (m) Durability of marking. The durability of the marking of the NMR 
aerial service wire shall comply with the requirements specified in 
Sec. 1755.702(j).

Sec. 1755.704   Requirements applicable to both CCSR and NMR aerial 
service wires.

    (a) Acceptance testing. (1) The tests described in Secs. 1755.700 
through 1755.704 are intended for acceptance of wire designs and major 
modifications of accepted designs. What constitutes a major 
modification is at the discretion of RUS. These tests are intended to 
show the inherent capability of the manufacturer to produce wire 
products having long life and stability.
    (2) For initial acceptance, the manufacturer shall:
    (i) Certify that the product fully complies with each paragraph in 
Secs. 1755.700 through 1755.704;
    (ii) Agree to periodic plant inspections by RUS;
    (iii) Certify whether the product complies with the domestic origin 
manufacturing provisions of the ``Buy American'' requirements of the 
Rural Electrification Act of 1938 (7 U.S.C. 903 note), as amended (the 
``REA Buy-American provision'');
    (iv) Submit at least three written user testimonials concerning 
field performance of the product; and
    (v) Provide any other nonpropriety data deemed necessary by the 
Chief, Outside Plant Branch (Telecommunications).
    (3) In order for RUS to consider a manufacturer's request that a 
product be requalified, the manufacturer shall certify not later than 
June 30 of the year in which requalification is required, that the 
product:
    (i) Fully complies with each paragraph in Secs. 1755.700 through 
1755.704; and
    (ii) Does or does not comply with the domestic origin manufacturing 
provisions of the REA Buy American provisions.The required 
certifications shall be dated within 90 days of the submission.
    (4) Initial and requalification acceptance requests should be 
addresses to: Chairman, Technical Standards Committee ``A'' 
(Telecommunications), Telecommunications Standards Division, Rural 
Utilities Service, AG Box 1598, Washington, DC 20250-1598.
    (b) Extent of testing--(1) Tests on 100 percent of completed wire. 
(i) Each conductor in the completed CCSR and NMR aerial service wire 
shall be tested for continuity in accordance with ANSI/ICEA S-89-648-
1993, paragraphs 7.1.1 and 7.2.1, respectively. The ANSI/ICEA S-89-648-
1993 Standard For Telecommunications Aerial Service Wire, Technical 
Requirements (approved by ANSI July 11, 1994) is incorporated by 
reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies 
of ANSI/ICEA S-89-648-1993 are available for inspection during normal 
business hours at RUS, room 2845, U.S. Department of Agriculture, 
Washington, DC 20250-1500 or at the Office of the Federal Register, 800 
North Capitol Street, NW., suite 700, Washington, DC. Copies are 
available from ICEA, P. O. Box 440, South Yarmouth, MA 02664, telephone 
number (508) 394-4424.
    (ii) Each conductor in the completed CCSR and NMR aerial service 
wire shall be tested for shorts in accordance with ANSI/ICEA S-89-648-
1993, paragraphs 7.1.1 and 7.2.1, respectively.
    (iii) Each length of completed CCSR and NMR aerial service wire 
shall be

[[Page 26078]]

tested for insulation imperfections in accordance with 
Sec. 1755.702(e)(7) and Sec. 1755.703(b)(5), respectively.
    (2) Capability tests. Tests on a quality assurance basis shall be 
made as frequently as is required for each manufacturer to determine 
and maintain compliance with:
    (i) Performance of the conductors;
    (ii) Performance of the conductor insulation and jacket material;
    (iii) Sequential marking and lettering;
    (iv) Mutual capacitance, capacitance unbalance, attenuation, and 
crosstalk;
    (v) Conductor resistance, resistance unbalance, and insulation 
resistance;
    (vi) Dielectric strength and fusing coordination;
    (vii) Impact, abrasion, static load, elongation, and plasticizer 
compatibility tests; and
    (viii) Cold temperature handling, light absorption, low temperature 
separation, and flammability tests.
    (c) Summary of records of electrical and physical tests. (1) Each 
manufacturer shall maintain suitable summary records for a period of at 
least 3 years of all electrical and physical tests required on 
completed wire as set forth in paragraph (b) of this section. The test 
data for a particular lot of aerial service wire shall be in a form 
such that it may be readily available to the purchaser or to RUS upon 
request.
    (2) Measurements and computed values shall be rounded off to the 
number of places or figures specified for the requirement according to 
ANSI/ICEA S-89-648-1993, paragraph 1.3.
    (d) Manufacturing irregularities. (1) Repairs to the insulation of 
CCSR aerial service wires are not permitted in wires supplied to end 
users under Secs. 1755.700 through 1755.704.
    (2) Repairs to the jacket of NMR aerial service wires are not 
permitted in wires supplied to end users under Secs. 1755.700 through 
1755.704.
    (e) Splicing. Splicing of completed CCSR and NMR aerial service 
wires shall comply with the requirement specified in ANSI/ICEA S-89-
648-1993, paragraph 8.1.1.
    (f) Preparation for shipment. (1) CCSR and NMR aerial service wire 
shall be shipped either in coils or on reels.
    (2) When CCSR and NMR aerial service wires are shipped on reels the 
following provisions shall apply:
    (i) The diameter of the drum shall be large enough to prevent 
damage to the wire from reeling or unreeling. The reels shall be 
substantial and so constructed as to prevent damage to the wire during 
shipment and handling;
    (ii) A waterproof corrugated board or other suitable means of 
protection accepted by RUS prior to its use may be applied to the reel. 
If the waterproof corrugated board or other suitable material is used 
for protection, it shall be suitably secured in place to prevent damage 
to the wire during storage and handling. The use of the waterproof 
corrugated board or other suitable means of protection shall be at the 
option of the manufacturer unless specified by the end user;
    (iii) The outer end of the wire shall be securely fastened to the 
reel head so as to prevent the wire from becoming loose in transit. The 
inner end of the wire shall be securely fastened in such a way as to 
make it readily available if required for electrical testing. Spikes, 
staples, or other fastening devices which penetrate the conductor 
insulation of the CCSR aerial service wire and the jacket of the NMR 
aerial service wire shall not be used. The method of fastening the wire 
ends shall be accepted by RUS prior to their use;
    (iv) Each length of wire shall be wound on a separate reel;
    (v) Each reel shall be plainly marked to indicate the direction in 
which it should be rolled to prevent loosening of the wire on the reel; 
and
    (vi) Each reel shall be stenciled or labeled on either one or both 
sides with the following information:
    (A) Customer order number;
    (B) Manufacturer's name and product code;
    (C) Factory reel number and year of manufacture;
    (D) Gauge of conductors and pair size of wire;
    (E) Length of wire; and
    (F) RUS designation letter ``K.''
    (3) When CCSR and NMR aerial service wires are shipped in coils the 
following provisions shall apply:
    (i) The diameter of the coil shall be large enough to prevent 
damage to the wire from coiling or uncoiling;
    (ii) The nominal length of the wire in a coil shall be 305 meters 
(1,000 feet). No coil shall be less than 290 meters (950 feet) long or 
more than 460 meters (1,500 feet) long; however, 25 percent of the 
total number of coils may be less than 305 meters (1,000 feet);
    (iii) The coils of wire shall be wound securely with strong tape in 
four separate evenly spaced places;
    (iv) The coils may be protected from damage by wrapping the coil 
with heavy paper, burlap, or other suitable material accepted by RUS 
prior to its use. The use of the heavy paper, burlap, or other suitable 
means of protection shall be at the option of the manufacturer unless 
specified by the end user; and
    (v) Each coil shall be tagged with the following information:
    (A) Customer order number;
    (B) Manufacturer's name and product code;
    (C) Year of manufacture;
    (D) Gauge of conductors and pair size of wire;
    (E) Length of wire; and
    (F) RUS designation letter ``K.''
    (4) In lieu of wrapping the coil with heavy paper, burlap, or other 
suitable material, the coil may be packaged in a moisture resistant 
carton.
    (5) When the coils are shipped in moisture resistant cartons, each 
carton shall be marked with the information specified in paragraphs 
(f)(3)(v)(A) through (f)(3)(v)(F) of this section.
    (6) Other methods of shipment may be used if accepted by RUS prior 
to their use.
    (7) When NMR aerial service wire is shipped, the ends of the wire 
shall be sealed in accordance with ANSI/ICEA S-89-648-1993, paragraph 
9.2.

    Dated: May 10, 1996.
Jill Long Thompson,
Under Secretary, Rural Development.
[FR Doc. 96-12834 Filed 5-23-96; 8:45 am]
BILLING CODE 3410-15-P

Complete official Federal Register PDF

FR Doc. 96-12731 Airworthiness Directives; Airbus Industrie Model A300, A300-600, and A310 Series Airplanes
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26091-26094]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12731]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-85-AD; Amendment 39-9630; AD 96-11-05]
RIN 2120-AA64

Airworthiness Directives; Airbus Industrie Model A300, A300-600, 
and A310 Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD), 
applicable to certain Airbus Industrie Model A300, A300-600, and A310 
series airplanes, that requires inspections to detect cracks in the 
lower spar axis of the pylons between ribs 6 and 7, and repair, if 
necessary. This amendment is prompted by reports that fatigue cracking 
has been found on the lower spar of the pylon. The actions specified by 
this AD are intended to prevent such fatigue cracking, which could 
result in reduced structural integrity of the lower spar of the pylon.

DATES: Effective June 28, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of June 28, 1996.

ADDRESSES: The service information referenced in this AD may be 
obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 
Blagnac Cedex, France. This information may be examined at the Federal 
Aviation Administration (FAA), Transport Airplane Directorate, Rules 
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of 
the Federal Register, 800 North Capitol Street, NW., suite 700, 
Washington, DC.

FOR FURTHER INFORMATION CONTACT: Tim Backman, Aerospace Engineer, 
Standardization Branch, ANM-113, FAA, Transport Airplane Directorate, 
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (206) 
227-2797; fax (206) 227-1149.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) to include an airworthiness 
directive (AD) that is applicable to certain Airbus Industrie Model 
A300, A300-600, and A310 series airplanes was published in the Federal 
Register on March 6, 1996 (61 FR 8892). That action proposed to require 
inspections to detect cracks in the lower spar axis of the pylons 
between ribs 6 and 7, and repair, if necessary.
    Interested persons have been afforded an opportunity to participate 
in the

[[Page 26092]]

making of this amendment. Due consideration has been given to the 
comments received.

Support for the Proposal

    One commenter supports the proposed rule.

Request To Revise Compliance Threshold for Inspection

    One commenter requests that the inspection threshold specified in 
paragraph (h) of the proposal be revised from 14,500 landings to 17,000 
landings for consistency with the threshold provided in Airbus Service 
Bulletin A300-54-6014, Revision 1, dated March 28, 1994.
    The FAA concurs with the commenter's request. The FAA's intent is 
that the inspection threshold and repetitive inspection interval 
specified in paragraph (h) of this AD parallel the threshold and 
interval recommended in the Airbus service bulletin. The FAA has 
revised paragraph (h) of the final rule to specify an inspection 
threshold of 17,000 landings. The repetitive inspection interval of 
14,500 landings, which was recommended in the Airbus service bulletin, 
remains unchanged in this final rule.

Correction of Service Bulletin Number

    The FAA has revised the reference to a service bulletin number that 
appeared in paragraph (i) of the proposed AD as Airbus Industrie 
Service Bulletin A300-54-2017. The correct service bulletin number is 
A310-54-2017.

Conclusion

    After careful review of the available data, including the comments 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule with the changes previously 
described. The FAA has determined that these changes will neither 
increase the economic burden on any operator nor increase the scope of 
the AD.

Cost Impact

    The FAA estimates that 99 airplanes of U.S. registry will be 
affected by this AD, that it will take approximately 8 work hours per 
airplane to accomplish the required actions, and that the average labor 
rate is $60 per work hour. Based on these figures, the cost impact of 
the AD on U.S. operators is estimated to be $47,520, or $480 per 
airplane, per inspection cycle.
    The cost impact figure discussed above is based on assumptions that 
no operator has yet accomplished any of the requirements of this AD 
action, and that no operator would accomplish those actions in the 
future if this AD were not adopted.
    Should an operator of a Model A300 series airplane elect to 
accomplish the optional modification that is provided by this AD 
action, it will take approximately 100 work hours to accomplish, at an 
average labor rate of $60 per work hour. The cost of required parts 
will be approximately $1,500 per airplane. Based on these figures, the 
cost impact of the optional modification for Model A300 series 
airplanes is estimated to be $7,500 per airplane.
    Should an operator of a Model A300-600 or A310 series airplane 
elect to accomplish the optional modification that is provided by this 
AD action, it will take approximately 110 work hours to accomplish, at 
an average labor rate of $60 per work hour. The cost of required parts 
will be approximately $1,500 per airplane. Based on these figures, the 
cost impact of the optional modification for Model A300-600 and A310 
series airplanes is estimated to be $8,100 per airplane.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

96-11-05  Airbus Industrie: Amendment 39-9630. Docket 95-NM-85-AD.

    Applicability: Model A300, A300-600, and A310 series airplanes; 
as listed in Airbus Industrie Service Bulletins A300-54-0073, A300-
54-6014, and A310-54-2017, all Revision 1, all dated March 28, 1994; 
certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (k) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent reduced structural integrity of the lower spar, 
accomplish the following:
    (a) For Model A300 series airplanes equipped with General 
Electric CF6-50C engines, and having pylons that have not been 
modified in accordance with Airbus Industrie Service Bulletin A300-
54-0080, Revision 1, dated January 16, 1995: Prior to the 
accumulation of 10,900 total landings, or within 500 landings after 
the effective date of this AD, whichever occurs later, perform an 
internal eddy current inspection to detect cracks in the lower spar 
axis of the pylons between ribs 6 and 7, in accordance with Airbus 
Industrie Service Bulletin A300-54-0073, Revision 1, dated March 28, 
1994.
    (1) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 6,700 landings.
    (2) If any crack is found that is less than 35 mm, prior to 
further flight, stop-drill the crack in accordance with the 
procedures specified in Section 51-41-10 of the Structural Repair 
Manual (SRM). Thereafter, prior to the accumulation of 250 landings 
after crack discovery, repair in accordance with the service 
bulletin. Prior to the accumulation of 17,900 landings after 
accomplishing the repair, perform an eddy current inspection to 
detect cracks at the stiffener ends, ribs 6 and 7, at the edge of 
the holes made during the repair and on the fasteners located at the 
edge of the doubler, in accordance with the service bulletin.

[[Page 26093]]

    (i) If no crack is found, repeat the inspection required by 
paragraph (a)(2) of this AD thereafter at intervals not to exceed 
15,000 landings.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113, FAA, Transport Airplane Directorate.
    (3) If any crack is found that is greater than or equal to 35 
mm, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113.
    (b) For Model A300 series airplanes equipped with General 
Electric CF6-50C engines, and having pylons that have been modified 
in accordance with Airbus Industrie Service Bulletin A300-54-0080, 
Revision 1, dated January 16, 1995: Prior to the accumulation of 
30,300 landings since installation of the modification, or within 
500 landings after the effective date of this AD, whichever occurs 
later, perform an eddy current inspection to detect cracks in the 
lower spar axis of the pylons between ribs 6 and 7, in accordance 
with Airbus Industrie Service Bulletin A300-54-0073, Revision 1, 
dated March 28, 1994.
    (1) If no crack is found, repeat the eddy current inspection 
thereafter at intervals not to exceed 21,300 landings.
    (2) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (c) For Model A300 series airplanes equipped with Pratt & 
Whitney JT9D-59A engines, and having pylons that have not been 
modified in accordance with Airbus Industrie Service Bulletin A300-
54-0080, Revision 1, dated January 16, 1995: Prior to the 
accumulation of 8,600 total landings, or within 500 landings after 
the effective date of this AD, whichever occurs later, perform an 
internal eddy current inspection to detect cracks in the lower spar 
axis of the pylons between ribs 6 and 7, in accordance with Airbus 
Industrie Service Bulletin A300-54-0073, Revision 1, dated March 28, 
1994.
    (1) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 5,700 landings.
    (2) If any crack is found that is less than 35 mm, prior to 
further flight, stop-drill the crack in accordance with the 
procedures specified in Section 51-41-10 of the SRM. Thereafter, 
prior to the accumulation of 250 landings after crack discovery, 
repair in accordance with the service bulletin. Prior to the 
accumulation of 14,200 landings after accomplishing the repair, 
perform an eddy current inspection to detect cracks at the stiffener 
ends, ribs 6 and 7, at the edge of the holes made during the repair 
and on the fasteners located at the edge of the doubler, in 
accordance with the service bulletin.
    (i) If no crack is found, repeat the inspection required by 
paragraph (c)(2) of this AD thereafter at intervals not to exceed 
12,800 landings.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (3) If any crack is found that is greater than or equal to 35 
mm, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113. -
    (d) For Model A300 series airplanes equipped with Pratt & 
Whitney JT9D-59A engines, and having pylons that have been modified 
in accordance with Airbus Industrie Service Bulletin A300-54-0080, 
Revision 1, dated January 16, 1995: Prior to the accumulation of 
24,000 landings since installation of the modification, or within 
500 landings after the effective date of this AD, whichever occurs 
later, perform an eddy current inspection to detect cracks in the 
lower spar axis of the pylons between ribs 6 and 7, in accordance 
with Airbus Industrie Service Bulletin A300-54-0073, Revision 1, 
dated March 28, 1994.
    (1) If no crack is found, repeat the eddy current inspection 
thereafter at intervals not to exceed 18,200 landings.
    (2) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (e) For Model A300-600 series airplanes equipped with General 
Electric CF6-80C2 engines, and having pylons that have not been 
modified in accordance with Airbus Industrie Service Bulletin A300-
54-6020, dated February 22, 1994: Prior to the accumulation of 9,400 
total landings, or within 500 landings after the effective date of 
this AD, whichever occurs later, perform an internal eddy current 
inspection to detect cracks in the lower spar axis of the pylons 
between ribs 6 and 7, in accordance with Airbus Industrie Service 
Bulletin A300-54-6014, Revision 1, dated March 28, 1994.
    (1) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 6,100 landings.
    (2) If any crack is found that is less than or equal to 35 mm, 
prior to further flight, stop-drill the crack in accordance with the 
procedures specified in Section 51-41-10 of the SRM. Thereafter, 
prior to the accumulation of 250 landings after crack discovery, 
repair in accordance with the service bulletin. Prior to the 
accumulation of 15,600 landings after accomplishing the repair, 
perform an eddy current inspection to detect cracks at the stiffener 
ends, ribs 6 and 7, at the edge of the holes made during the repair 
and on the fasteners located at the edge of the doubler, in 
accordance with the service bulletin.
    (i) If no crack is found, repeat the inspection required by 
paragraph (e)(2) of this AD thereafter at intervals not to exceed 
13,600 landings.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (3) If any crack is found that is greater than or equal to 35 
mm, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113.
    (f) For Model A300-600 series airplanes equipped with General 
Electric CF6-80C2 engines, and having pylons that have been modified 
in accordance with Airbus Industrie Service Bulletin A300-54-6020, 
dated February 22, 1994: Prior to the accumulation of 26,400 
landings since installation of the modification, or within 500 
landings after the effective date of this AD, whichever occurs 
later, perform an eddy current inspection to detect cracks in the 
lower spar axis of the pylons between ribs 6 and 7, in accordance 
with Airbus Industrie Service Bulletin A300-54-6014, Revision 1, 
dated March 28, 1994.
    (1) If no crack is found, repeat the eddy current inspection 
thereafter at intervals not to exceed 19,400 landings.
    (2) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (g) For Model A300-600 series airplanes equipped with Pratt & 
Whitney JT9D-7R4 or PW 4000 engines, and having pylons that have not 
been modified in accordance with Airbus Industrie Service Bulletin 
A300-54-6020, dated February 22, 1994: Prior to the accumulation of 
5,700 total landings, or within 500 landings after the effective 
date of this AD, whichever occurs later, perform an internal eddy 
current inspection to detect cracks in the lower spar axis of the 
pylons between ribs 6 and 7, in accordance with Airbus Industrie 
Service Bulletin A300-54-6014, Revision 1, dated March 28, 1994.
    (1) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 4,400 landings.
    (2) If any crack is found that is less than 35 mm, prior to 
further flight, stop-drill the crack in accordance with the 
procedures specified in Section 51-41-10 of the SRM. Thereafter, 
prior to the accumulation of 250 landings after crack discovery, 
repair in accordance with the service bulletin. Prior to the 
accumulation of 10,100 landings after accomplishing the repair, 
perform an eddy current inspection to detect cracks at the stiffener 
ends, ribs 6 and 7, at the edge of the holes made during the repair 
and on the fasteners located at the edge of the doubler, in 
accordance with the service bulletin.
    (i) If no crack is found, repeat the inspection required by 
paragraph (g)(2) of this AD thereafter at intervals not to exceed 
10,000 landings.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (3) If any crack is found that is greater than or equal to 35 
mm, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113.
    (h) For Model A300-600 series airplanes equipped with Pratt & 
Whitney JT9D-7R4 or PW 4000 engines, and having pylons that have 
been modified in accordance with Airbus Industrie Service Bulletin 
A300-54-6020, dated February 22, 1994: Prior to the accumulation of 
17,000 landings since installation of the modification, or within 
500 landings after the effective date of this AD, whichever occurs 
later, perform an eddy current inspection to detect cracks in the 
lower spar axis of the pylons between ribs 6 and 7, in accordance 
with Airbus Industrie Service Bulletin A300-54-6014, Revision 1, 
dated March 28, 1994.

[[Page 26094]]

    (1) If no crack is found, repeat the eddy current inspection 
thereafter at intervals not to exceed 14,500 landings.
    (2) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (i) For Model A310 series airplanes equipped with General 
Electric CF6-80C2, or Pratt & Whitney JT9D-7R4, or Pratt & Whitney 
PW4000 engines: Prior to the accumulation of 36,700 total landings, 
or within 500 landings after the effective date of this AD, 
whichever occurs later, perform an internal eddy current inspection 
to detect cracks in the lower spar axis of the pylons between ribs 6 
and 7, in accordance with Airbus Industrie Service Bulletin A310-54-
2017, Revision 1, dated March 28, 1994.
    (1) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 15,000 landings.
    (2) If any crack is found that is less than 35 mm, prior to 
further flight, stop-drill the crack in accordance with the 
procedures specified in Section 51-41-10 of the SRM. Thereafter, 
prior to the accumulation of 250 landings after crack discovery, 
repair in accordance with the service bulletin. Prior to the 
accumulation of 40,000 landings after accomplishing the repair, 
perform an eddy current inspection to detect cracks at the stiffener 
ends, ribs 6 and 7, at the edge of the holes made during the repair 
and on the fasteners located at the edge of the doubler, in 
accordance with the service bulletin.
    (i) If no crack is found, repeat the inspection required by 
paragraph (i)(2) of this AD thereafter at intervals not to exceed 
33,000 landings.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (3) If any crack is found that is greater than or equal to 35 
mm, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113.
    (j) For Model A310 series airplanes equipped with General 
Electric CF6-80C2, or Pratt & Whitney JT9D-7R4, or Pratt & Whitney 
PW4000 engines: Accomplishment of the modification specified in 
Airbus Industrie Service Bulletin A310-54-2023, dated October 15, 
1993, constitutes terminating action for the inspections required by 
paragraph (i) of this AD.
    (k) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Standardization Branch, ANM-113. 
Operators shall submit their requests through an appropriate FAA 
Principal Maintenance Inspector, who may add comments and then send 
it to the Manager, Standardization Branch, ANM-113.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Standardization Branch, ANM-113.

    (l) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (m) The actions shall be done in accordance with the following 
Airbus Industrie service bulletins, which contain the specified 
effective pages:

----------------------------------------------------------------------------------------------------------------
Service bulletin referenced and                                 Revision level shown on                         
              date                         Page No.-                      page              Date shown on page  
----------------------------------------------------------------------------------------------------------------
A300-54-0073, Revision 1, March  1,5..........................  1......................  Mar. 28, 1994.         
 28, 1994.                                                                                                      
                                 2-4, 6-36....................  Original...............  Oct. 15, 1993.         
A300-54-6014, Revision 1, March  1-4, 13......................  1......................  Mar. 28, 1994.         
 28, 1994.                                                                                                      
                                 5-12, 14-44..................  Original...............  Oct. 15, 1993.         
A310-54-2017, Revision 1, March  1, 5,........................  1......................  Mar. 28, 1994.         
 28, 1994.                                                                                                      
                                 2-4, 6-48....................  Original...............  Oct. 15, 1993.         
A310-54-2023, October 15, 1993.  1-38.........................  Original...............  Oct. 15, 1993.         
----------------------------------------------------------------------------------------------------------------

This incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Copies may be obtained from Airbus Industrie, 1 Rond Point 
Maurice Bellonte, 31707 Blagnac Cedex, France. Copies may be 
inspected at the FAA, Transport Airplane Directorate, 1601 Lind 
Avenue, SW., Renton, Washington; or at the Office of the Federal 
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
    (n) This amendment becomes effective on June 28, 1996.

    Issued in Renton, Washington, on May 15, 1996.
S.R. Miller,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-12731 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12730 Airworthiness Directives; Learjet Model 31 and 35A Airplanes
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26090-26091]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12730]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-197-AD; Amendment 39-9632; AD 96-11-07]
RIN 2120-AA64

Airworthiness Directives; Learjet Model 31 and 35A Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD), 
applicable to certain Learjet Model 31 and 35A airplanes, that requires 
replacement of two segments of 16 American Wire Gauge (AWG) wire with 8 
AWG wire at the connector that is connected to the auxiliary cabin 
heater relay box. This amendment is prompted by a report that two 
segments of the 16 AWG wire in the auxiliary cabin heater that were 
spliced during production do not provide adequate current-carrying 
capacity. The actions specified by this AD are intended to prevent 
electrical arcing and a subsequent fire hazard that could result from 
wiring with inadequate current-carrying capacity.

DATES: Effective June 28, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of June 28, 1996.

ADDRESSES: The service information referenced in this AD may be 
obtained from Learjet, Inc., One Learjet Way, Wichita, Kansas 67209-
2942. This information may be examined at the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, Rules Docket, 
1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Wichita 
Aircraft Certification Office, Small Airplane Directorate, 1801 Airport 
Road, Room 100, Mid-Continent Airport, Wichita, Kansas; or at the 
Office of the Federal Register, 800 North Capitol Street, NW., suite 
700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Dale Bleakney, Aerospace Engineer, 
Flight Test Branch, ACE-117W, FAA, Small Airplane Directorate, Wichita 
Aircraft Certification Office, 1801 Airport Road, Room 100, Mid-
Continent Airport, Wichita, Kansas; telephone (316) 946-4135; fax (316) 
946-4407.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) to include an airworthiness 
directive (AD) that is applicable to certain Learjet Model 31 and 35A 
airplanes was published in the Federal Register on March 7, 1996 (61 FR 
9119). That action proposed to require replacement of two segments of 
16 AWG wire with 8 AWG wire at the P190 connector that is connected to 
the E33 auxiliary cabin heater relay box.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. No comments were submitted in response 
to the proposal or the FAA's determination of the cost to the public.

Conclusion

    The FAA has determined that air safety and the public interest 
require the adoption of the rule as proposed.

Cost Impact

    There are approximately 52 Learjet Model 31 and 35A airplanes of 
the affected design in the worldwide fleet. The FAA estimates that 44 
airplanes of U.S. registry will be affected by this AD, that it will 
take approximately 4 work hours per airplane to accomplish the required 
actions, and that the average labor rate is $60 per work hour. Required 
parts will be supplied by the manufacturer at no cost to the operators. 
Based on these figures, the cost impact of the AD on U.S. operators is 
estimated to be $10,560, or $240 per airplane.
    The cost impact figure discussed above is based on assumptions that 
no operator has yet accomplished any of the requirements of this AD 
action, and that no operator would accomplish those actions in the 
future if this AD were not adopted.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various

[[Page 26091]]

levels of government. Therefore, in accordance with Executive Order 
12612, it is determined that this final rule does not have sufficient 
federalism implications to warrant the preparation of a Federalism 
Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

96-11-07  Learjet, Inc.: Amendment 39-9632. Docket 95-NM-197-AD.

    Applicability: Model 31 airplanes having serial numbers 31-002 
through 31-029 inclusive, and Model 35A airplanes having serial 
numbers 35-647 through 35-670 inclusive; certificated in any 
category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (b) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent electrical arcing and subsequent fire hazard, 
accomplish the following:
    (a) Within 6 months after the effective date of this AD, replace 
two segments of 16 American Wire Gauge (AWG) wire with 8 AWG wire at 
the P190 connector that is connected to the E33 auxiliary cabin 
heater relay box, in accordance with Learjet Service Bulletin SB 31-
21-10, dated August 11, 1995 (for Model 31 airplanes), or Learjet 
Service Bulletin SB 35-21-24, dated August 11, 1995 (for Model 35A 
airplanes), as applicable.
    (b) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Wichita Aircraft Certification 
Office (ACO), FAA, Small Airplane Directorate. Operators shall 
submit their requests through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Wichita ACO.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Wichita ACO.

    (c) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (d) The replacement shall be done in accordance with Learjet 
Service Bulletin SB 31-21-10, dated August 11, 1995, or Learjet 
Service Bulletin SB 35-21-24, dated August 11, 1995, as applicable. 
This incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Copies may be obtained from Learjet, Inc., One Learjet Way, 
Wichita, Kansas 67209-2942. Copies may be inspected at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, 
Washington; or at the FAA, Wichita Aircraft Certification Office, 
Small Airplane Directorate, 1801 Airport Road, Room 100, Mid-
Continent Airport, Wichita, Kansas; or at the Office of the Federal 
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
    (e) This amendment becomes effective on June 28, 1996.

    Issued in Renton, Washington, on May 15, 1996.
S.R. Miller,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-12730 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12729 Airworthiness Directives; de Havilland Model DHC-7 Series Airplanes
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26088-26090]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12729]

=======================================================================
-----------------------------------------------------------------------

[[Page 26089]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 95-NM-110-AD; Amendment 39-9631; AD 96-11-06]
RIN 2120-AA64

Airworthiness Directives; de Havilland Model DHC-7 Series 
Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD), 
applicable to certain de Havilland Model DHC-7 series airplanes, that 
requires modification of the emergency lights circuitry. This amendment 
is prompted by reports of the emergency lights turning on inadvertently 
due to voltage spikes from other equipment; and reports that the 
existing emergency light switch arrangement allows the flight 
compartment and flight attendant's panel switches to override each 
other. The actions specified by this AD are intended to prevent such 
failures of the emergency light systems, which could prevent the use of 
the emergency lights in the event of an emergency.

DATES: Effective June 28, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of June 28, 1996.

ADDRESSES: The service information referenced in this AD may be 
obtained from Bombardier, Inc., Bombardier Regional Aircraft Division, 
Garratt Boulevard, Downsview, Ontario M3K 1Y5, Canada. This information 
may be examined at the Federal Aviation Administration (FAA), Transport 
Airplane Directorate, Rules Docket, 1601 Lind Avenue, SW., Renton, 
Washington; or at the FAA, Engine and Propeller Directorate, New York 
Aircraft Certification Office, 10 Fifth Street, Third Floor, Valley 
Stream, New York; or at the Office of the Federal Register, 800 North 
Capitol Street, NW., suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: Wing Chan, Aerospace Engineer, Systems 
and Flight Test Branch, ANE-172, FAA, Engine and Propeller Directorate, 
New York Aircraft Certification Office, 10 Fifth Street, Third Floor, 
Valley Stream, New York 11581; telephone (516) 256-7511; fax (516) 568-
2716.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) to include an airworthiness 
directive (AD) that is applicable to certain de Havilland Model DHC-7 
series airplanes was published in the Federal Register on January 9, 
1996 (61 FR 636). That action proposed to require modification of the 
emergency lights circuitry.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received.

Support for the Proposal

    Two commenters support the proposed rule.

Request To Include an Additional Modification Requirement

    One commenter requests that proposed rule be revised to include a 
requirement to install Modification 7/2622. This modification is 
described in de Havilland Service Bulletin 7-33-23 and also affects the 
emergency lighting system. The commenter mentions that this 
modification is mandated by Canadian airworthiness directive CF 95-03. 
The commenter states that, by including a requirement in the proposal 
to install Modification 7/2622, safety would be enhanced and 
unnecessary requests for alternate means of compliance would be 
avoided.
    The FAA does not concur with the commenter's request to revise this 
AD action to require installation of Modification 7/2622. The FAA finds 
that, although the unsafe condition that prompted the Transport Canada 
airworthiness action to mandate that modification concerns the failure 
of the emergency lighting systems, the cause of that failure is 
different from the causes of failure addressed in this AD. 
Additionally, the modification affects some airplanes other than those 
identified in the applicability of this AD.
    However, the FAA is considering separate rulemaking action to 
address the installation of Modification 7/2622 on applicable 
airplanes.

Conclusion

    After careful review of the available data, including the comments 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule as proposed.

Cost Impact

    The FAA estimates that 14 airplanes of U.S. registry will be 
affected by this AD, that it will take approximately 8 work hours per 
airplane to accomplish the required actions, and that the average labor 
rate is $60 per work hour. Required parts will be provided at no cost 
to the operators. Based on these figures, the cost impact of the AD on 
U.S. operators is estimated to be $6,720, or $480 per airplane.
    The cost impact figure discussed above is based on assumptions that 
no operator has yet accomplished any of the requirements of this AD 
action, and that no operator would accomplish those actions in the 
future if this AD were not adopted.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

[[Page 26090]]

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

96-11-06  De Havilland, Inc.: Amendment 39-9631. Docket 95-NM-110-
AD.

    Applicability: Model DHC-7 series airplanes, serial numbers 3 
through 27 inclusive, on which de Havilland Modification No. 7/1697 
has not been installed; certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
otherwise modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (c) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously. -
    To prevent failure of the emergency lighting system due to 
voltage spikes from other equipment or due to inadvertent override 
of the emergency lighting switches, accomplish the following:
    (a) Within 6 months after the effective date of this AD, modify 
the emergency lights circuitry by accomplishing de Havilland 
Modification No. 7/1697 (Emergency Lights- Revised Switching Logic), 
in accordance with the Accomplishment Instructions of de Havilland 
Service Bulletin No. 7-33-7, dated October 17, 1980.
    (b) As of the effective date of this AD, no person shall install 
an emergency light switch, part number MS24659-21A, on any airplane 
subject to this AD.
    (c) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, New York Aircraft Certification 
Office (ACO), FAA, Engine and Propeller Directorate. Operators shall 
submit their requests through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, New York ACO.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the New York ACO.

    (d) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (e) The modification shall be done in accordance with de 
Havilland Service Bulletin No. 7-33-7, dated October 17, 1980. This 
incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Copies may be obtained from Bombardier, Inc., Bombardier 
Regional Aircraft Division, Garratt Boulevard, Downsview, Ontario 
M3K 1Y5, Canada. Copies may be inspected at the FAA, Transport 
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or 
at the FAA, New York Aircraft Certification Office, Engine and 
Propeller Directorate, 10 Fifth Street, Third Floor, , Valley 
Stream, New York 11581; or at the Office of the Federal Register, 
800 North Capitol Street, NW., suite 700, Washington, DC.
    (f) This amendment becomes effective on June 28, 1996.

    Issued in Renton, Washington, on May 15, 1996.
S.R. Miller,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-12729 Filed 5-23-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-12647 Endangered and Threatened Wildlife and Plants; Final Designation of Critical Habitat for the Marbled Murrelet
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26256-26320]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12647]

[[Page 26255]]

_______________________________________________________________________

Part II

Department of the Interior

_______________________________________________________________________

Fish and Wildlife Service

_______________________________________________________________________

50 CFR Part 17

Endangered and Threatened Wildlife and Plants; Final Designation of 
Critical Habitat for the Marbled Murrelet; Final Rule

Federal Register / Vol. 61, No. 102 / Friday, May 24, 1996 / Rules 
and Regulations

[[Page 26256]]

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 17

RIN 1018-AC33

Endangered and Threatened Wildlife and Plants; Final Designation 
of Critical Habitat for the Marbled Murrelet

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The U.S. Fish and Wildlife Service originally proposed to 
designate critical habitat for the marbled murrelet (Brachyramphus 
marmoratus marmoratus) in Washington, Oregon, and California on January 
27, 1994 (59 FR 3811). Based on comments received on the original 
proposal and additional information, the Service published a 
supplemental proposed designation of critical habitat for the marbled 
murrelet on August 10, 1995 (60 FR 40892).
    The marbled murrelet is listed as a threatened species under the 
Endangered Species Act (Act). It is a small seabird of the Alcidae 
family that forages in the near-shore marine environment and nests in 
large trees in coniferous forests. Located primarily on Federal land, 
and to a lesser extent on State, county, city, and private lands, this 
final critical habitat rule would provide additional protection 
requirements under section 7 of the Act with regard to activities that 
are funded, authorized, or carried out by a Federal agency. Section 4 
of the Act requires the Service to designate critical habitat for 
listed species on the basis of the best scientific information 
available and to consider the economic and other relevant impacts of 
including particular areas in the designation.

EFFECTIVE DATE: June 24, 1996.

ADDRESSES: The complete file for this rule is available at the U.S. 
Fish and Wildlife Service, Oregon State Office, 2600 S.E. 98th Avenue, 
Suite 100, Portland, Oregon 97266. The file for this rule will be 
available for public inspection, by appointment, during normal business 
hours at the above address.

FOR FURTHER INFORMATION CONTACT: Mr. Russell D. Peterson, State 
Supervisor, U.S. Fish and Wildlife Service, see ADDRESSES section or 
telephone 503-231-6179 or FAX 503-231-6195.

SUPPLEMENTARY INFORMATION:

Background

Previous Federal Actions

    On January 15, 1988, the U.S. Fish and Wildlife Service (Service) 
received a petition to list the North American subspecies of the 
marbled murrelet (Brachyramphus marmoratus marmoratus) in Washington, 
Oregon, and California as a threatened species under the Endangered 
Species Act. On October 17, 1988, the Service published a finding that 
the petition had presented substantial information to indicate that the 
requested action may be warranted (53 FR 40479). Because of the 
increased research effort and new information available, the status 
review period was reopened, with the concurrence of the petitioners, 
from March 5, 1990, through May 31, 1990 (55 FR 4913).
    On June 20, 1991, the Service published a proposal to list the 
marbled murrelet in Washington, Oregon, and California as a threatened 
species (56 FR 28362). The comment period was reopened for 30 days on 
January 30, 1992, to gather the most updated information about the 
species (57 FR 3804). On October 1, 1992, following an order by the 
U.S. District Court for the Western District of Washington denying a 6-
month extension, the Service published the final rule listing the 
marbled murrelet in Washington, Oregon, and California as a threatened 
species (57 FR 45328). In February 1993, the Service appointed a 
Recovery Team to develop a recovery plan for the marbled murrelet.
    On November 2, 1993, the U.S. District Court for the Western 
District of Washington granted a motion by the plaintiffs in Marbled 
Murrelet v. Babbitt to compel a proposed designation of critical 
habitat. In the ruling, the court ordered the Secretary of the Interior 
to propose designating critical habitat for the marbled murrelet no 
later than January 21, 1994, and to make a final designation of 
critical habitat as soon as reasonably possible under applicable law.
    On January 27, 1994, the Service published a proposed rule for the 
designation of critical habitat for the marbled murrelet (59 FR 3811). 
Public comment was due by April 27, 1994. On March 14, 1994, the 
Service received a request for a public hearing. To allow additional 
comment, the public comment period was reopened for 30 days on May 9, 
1994. The public hearing was conducted on May 24, 1994, in North Bend, 
Oregon.
    Based on comments received from the Marbled Murrelet Recovery Team, 
other commenters, and additional information, the Service significantly 
amended its proposed critical habitat designation and published a 
supplemental proposed rule on August 10, 1995 (60 FR 40892). The 
Service held five public hearings on the supplemental proposed rule in 
Washington, Oregon, and California during the public comment period. 
Public comment was accepted through October 10, 1995.
    Based on the Service's interpretation of Public Law 104-6 as 
prohibiting the expenditure of funds for making a final determination 
of critical habitat, the record was closed and the comments archived at 
the end of the public comment period. On February 29, 1996, Judge 
Rothstein denied a motion to vacate her previous order on completion of 
the designation of critical habitat and ordered the Service to complete 
the final designation by May 15, 1996. This rule complies with that 
order.

Ecological Considerations

    The marbled murrelet is a small seabird of the Alcidae family. The 
North American subspecies ranges from the Aleutian Archipelago in 
Alaska, eastward to Cook Inlet, Kodiak Island, Kenai Peninsula and 
Prince William Sound, south along the coast through the Alexander 
Archipelago of Alaska, British Columbia, Washington, and Oregon to 
central California. Some wintering birds are found in southern 
California. A separate subspecies (Brachyramphus marmoratus perdix) 
occurs in Asia. Though recent genetic analysis indicates that the two 
subspecies may warrant full specific status (Friesen et al. 1994), a 
status change has not yet been recognized.
    Marbled murrelets spend most of their lives in the marine 
environment where they feed primarily on small fish and invertebrates 
in near-shore marine waters. They forage by pursuit diving in waters 
generally up to 80 meters (260 feet) deep and 0.3 to 2 kilometers (0.2 
to 1.2 miles) off-shore. Pairs are often seen diving simultaneously, 
which researchers suggest may increase foraging efficiency (Strachan et 
al. 1995). Courtship behaviors have been observed at sea although 
copulation rarely has been witnessed. Marbled murrelets also aggregate, 
loaf, preen, and exhibit wing-stretching behaviors on the water.
    Marbled murrelets nest inland in Washington, Oregon, and 
California, typically in large-diameter old-growth trees in low-
elevation forests with multi-layered canopies (Hamer and Nelson 1995b). 
Marbled murrelets have been found occasionally on rivers and

[[Page 26257]]

inland lakes (Carter and Sealy 1986; Strachan et al. 1995).
    Dispersal mechanisms are not well understood, however, social 
interactions may play an important role. The presence of marbled 
murrelets in a forest stand may attract other pairs to currently 
unoccupied habitat within the vicinity. This may be one of the reasons 
marbled murrelets have been observed in habitat not currently suitable 
for nesting, but in close proximity to known nesting sites (Hamer and 
Cummins 1990, Hamer et al. 1991, Suddjian 1995). Although marbled 
murrelets appear to be solitary in their nesting habits, they are 
frequently detected in groups in the forest (Nelson and Peck 1995; 
USFWS 1995a). Two nests discovered in Washington during 1990 were 
located within 46 meters (150 feet) of each other (Hamer and Cummins 
1990), and two nests discovered in Oregon during 1994 were located 
within 33 meters (100 feet) of each other (S. K. Nelson, Oregon 
Cooperative Wildlife Research Unit, pers. comm. 1995). Therefore, 
unoccupied habitat in the vicinity of occupied habitat may be more 
important for recovering the species than suitable habitat isolated 
from occupied habitat (USFWS 1995a). Similarly, murrelets are more 
likely to discover newly developing habitat in proximity to occupied 
sites.
    Nesting occurs over an extended period from late March to late 
September (Carter and Sealy 1987; Hamer and Nelson 1995b). During the 
breeding period, the female marbled murrelet lays a single egg in a 
tree containing a suitable nesting platform (e.g., large or forked 
limbs, dwarf mistletoe (Arceuthobium spp.) infections, witches' brooms, 
deformities, etc. (Hamer and Nelson 1995b). Both sexes incubate the egg 
in alternating 24-hour shifts for approximately 30 days, and the young 
fledge after an additional 27 to 40 days (Simons 1980; Hirsch et al. 
1981; Singer et al. 1991; Hamer and Nelson 1995a; Nelson and Hamer 
1995a). Adults feeding young fly from ocean feeding areas to nest sites 
at all times of the day, but most often at dusk and dawn (Nelson and 
Hamer 1995a). Chicks are fed at least once a day. The adults usually 
carry only one fish at a time to the young (Hamer and Cummins 1991; 
Singer et al. 1992; Nelson and Hamer 1995a). The young are semi-
precocial. Before leaving the nest, the young molt into a distinctive 
juvenile plumage. A fledgling's first flight is from the nest directly 
to the marine environment (Hamer and Cummins 1991).
    Marbled murrelets have been observed at some inland sites during 
all months of the year (Paton et al. 1987; Naslund 1993). Attendance at 
breeding sites during the non-breeding season may enhance pair bond 
maintenance, facilitate earlier breeding, or reinforce familiarity with 
flight paths to breeding sites (Naslund and O'Donnell 1995; O'Donnell 
et al. 1995).
    With respect to critical habitat, the Service considered two 
components of marbled murrelet habitat that are biologically 
essential--(1) terrestrial nesting habitat and associated forest 
stands, and (2) marine foraging habitat used during the breeding 
season. Forested areas with conditions that support nesting marbled 
murrelets are referred to as ``suitable nesting habitat.'' Marine areas 
with conditions that support foraging marbled murrelets are referred to 
as ``suitable foraging habitat.'' Because only terrestrial habitat is 
being designated as critical habitat, the primary focus of this 
description will be on the terrestrial environment.
    Throughout the forested portion of the species' range, marbled 
murrelets typically nest in forested areas containing characteristics 
of older forests (Binford et al. 1975; Hamer and Cummins 1991; Quinlan 
and Hughes 1990; Kuletz 1991; Singer et al. 1991, 1992; Hamer et al. 
1994; Hamer and Nelson 1995b; Ralph et al. 1995a). The marbled murrelet 
population in Washington, Oregon, and California nests in most of the 
major types of coniferous forests in the western portions of these 
states, wherever older forests remain inland of the coast. Although 
marbled murrelet nesting habitat characteristics are somewhat variable 
throughout the range of the species, some general habitat attributes 
are characteristic throughout its range, including the presence of 
nesting platforms, adequate canopy cover over the nest, landscape 
condition, and distance to the marine environment.
    Individual tree attributes that provide conditions suitable for 
nesting include large branches (average of 32 centimeters (13 inches), 
range of 10 to 81 centimeters (4 to 32 inches) in Washington, Oregon, 
and California) or forked branches, deformities (e.g., broken tops), 
dwarf mistletoe infections, witches' brooms, or other structures large 
enough to provide a platform for a nesting adult murrelet (Hamer and 
Cummins 1991; Singer et al. 1991, 1992; Hamer and Nelson 1995b). These 
structures are typically found in old-growth and mature forests, but 
may be found in a variety of forest types including younger forests 
containing remnant large trees.
    Northwestern forests and trees typically require 200 to 250 years 
to attain the attributes necessary to support marbled murrelet nesting, 
although characteristics of nesting habitat sometimes develop in 
younger coastal redwood (Sequoia sempervirens) and western hemlock 
(Tsuga heterophylla) forests. Forests with older residual trees 
remaining from previous forest stands may also develop into nesting 
habitat more quickly than those without residual trees. These remnant 
attributes can be products of fire, wind storms, or previous logging 
operations that did not remove all of the trees (Hansen et al. 1991; 
McComb et al. 1993). Other factors that may affect the time required to 
develop suitable nesting habitat characteristics include site 
productivity and microclimate.
    Through the 1995 nesting season, at least 95 active or previously 
used tree nests had been located in North America, including 9 in 
Washington, 41 in Oregon, and 12 in California (S. K. Nelson, pers. 
comm. 1996; W. Ritchie, Washington Dept. of Fish and Wildlife, pers. 
comm. 1996; Binford et al. 1975; Quinlan and Hughes 1990; Hamer and 
Cummins 1990, 1991; Kuletz 1991; Singer et al. 1991, 1992; Hamer and 
Nelson 1995b). All of the nests for which data are available in 
Washington, Oregon, and California were in large trees that were more 
than 81 centimeters (32 inches) diameter at breast height (dbh) (Hamer 
and Nelson 1995b). Of the 37 nests for which data were available, 70 
percent were on a moss substrate and 30 percent were on litter, such as 
bark pieces, conifer needles, small twigs, or duff. Fifty-nine percent 
of the nests were on large or deformed branches, 16 percent were on 
forked limbs, 6 percent were on a limb where it attached to the tree 
bole, 11 percent were on dwarf mistletoe, and 8 percent were on other 
structures (Hamer and Nelson 1995b; T. Hamer, Hamer Environmental, 
pers. comm. 1995).
    More than 94 percent of the nests for which data were available 
were in the top half of the nest trees, which may allow easy nest 
access and provide shelter from potential predators and weather. Canopy 
cover directly over the nests was typically high (average 84 percent; 
range 5 to 100 percent) in Washington, Oregon, and California (Hamer 
and Nelson 1995b; T. Hamer, pers. comm. 1995). This cover may provide 
protection from predators and weather. Such canopy cover may be 
provided by trees adjacent to the nest tree, and/or by the nest tree 
itself. Canopy closure of the nest stand/site varied between 12 and 99 
percent and averaged 48 percent (Hamer and Nelson 1995b; T. Hamer, 
pers. comm. 1995).

[[Page 26258]]

    Nests have been located in forested areas dominated by coastal 
redwood, Douglas-fir (Pseudotsuga menziesii), mountain hemlock (Tsuga 
mertensiana), Sitka spruce (Picea sitchensis), western hemlock, and 
western redcedar (Thuja plicata) (Binford et al. 1975; Quinlan and 
Hughes 1990; Hamer and Cummins 1991; Singer et al. 1991, 1992; Hamer 
and Nelson 1995b). Individual nests in Washington, Oregon, and 
California have been located in Douglas-fir, coastal redwood, western 
hemlock, western redcedar, and Sitka spruce trees.
    For nesting habitat to be accessible to marbled murrelets, it must 
occur close enough to the marine environment for murrelets to fly back 
and forth. The farthest inland distance for a known occupied site is 84 
kilometers (52 miles) in Washington. The farthest known inland occupied 
sites in Oregon and California are 61 and 56 kilometers (38 and 35 
miles), respectively. Occupied sites are defined as forest stands where 
marbled murrelets have been observed exhibiting behaviors associated 
with nesting. Additionally, detections (not occupied sites) have been 
documented farther inland in Oregon (S. K. Nelson, pers. comm. 1995) 
and California.
    Marbled murrelet nests are difficult to locate for several 
reasons--(1) nests are generally located high in the canopy; (2) adults 
and juveniles have cryptic plumage during most of the nesting season; 
(3) adults are often (but not always) extremely quiet in the vicinity 
of nests (Nelson and Peck 1995); and (4) adults may show activity near 
the nest only once per day, usually under low light conditions. 
Therefore, identification of occupied sites and suitable nesting 
habitat are the best indicators of potential nest sites. Indicators of 
occupied habitat include active nests; egg shell fragments; young found 
on the forest floor; marbled murrelets seen flying through the forest 
beneath the canopy, landing in trees, circling above the canopy, and 
calling from a stationary perch; or large numbers of murrelets heard 
calling from in and around a forest stand.
    Inland, marbled murrelets are generally easier to detect at high-
use sites during the spring and late summer when breeding activities 
peak (Paton and Ralph 1988; Nelson 1989). Inland detections of the 
species are less frequent during the early fall when murrelets have 
presumably completed breeding and are undergoing a flightless molt at 
sea. Similarly, murrelets may be more difficult to detect in areas that 
support low numbers of reproducing pairs, perhaps because birds 
occurring in lower densities appear to be less vocal (Rodway et al. 
1993; Dillingham et al. 1995).
    Marbled murrelets spend most of their lives in the marine 
environment where they consume a diversity of prey species. Areas that 
support populations of prey species juxtaposed with nesting areas are 
essential to maintaining successfully reproducing marbled murrelet 
populations (Burkett 1995). Murrelets often aggregate near local food 
concentrations, resulting in a clumped distribution in the marine 
environment (Sealy and Carter 1984). Prey breeding areas (e.g., near-
shore kelp beds, sand or gravel beaches, sand banks, etc.) and areas 
where prey may concentrate (e.g., near-shore upwellings, waters at the 
mouths of bays and coastal rivers, eddies in the vicinity of headlands, 
river mouths and associated plumes, and tidal rips, etc.) are likely 
the most important features determining murrelet foraging opportunities 
(Ainley et al. 1995; Hunt 1995). Human-caused disturbances (e.g., 
intense commercial or recreational fishing) may affect prey density or 
accessibility.
    Most of the information available about prey species of marbled 
murrelets is from the Gulf of Alaska and British Columbia, and is 
summarized by Burkett (1995). Marbled murrelets generally forage in 
near-shore marine waters at distances of 0.3 to 2 kilometers (0.2 to 
1.2 miles) from shore; however, they occur at distances up to 24 
kilometers (14 miles) from shore in reduced numbers. Marine systems 
producing sufficient prey to support marbled murrelets provide suitable 
foraging habitat for the species.
    Marbled murrelets have been reported feeding on a wide variety of 
small fish and invertebrates, indicating their flexibility and 
capability to use alternative prey sources. Prey include Pacific 
sandlance (Ammodytes hexapterus), Pacific herring (Clupea harengus), 
northern anchovy (Engraulis mordax), osmerids, sea perch (Cymatogaster 
aggregata), euphausiids (Euphausia pacifica and Thysanoessa spinifera), 
mysids (Neomysis spp.), and amphipods, among others (Sealy 1975; Sanger 
1987; Sanger and Jones 1981; Carter and Sealy 1990; Strong et al. 1993; 
Burkett 1995). Fish are an important component of the diet during the 
summer, which coincides with the nestling and fledgling periods, while 
euphausiids, mysids, and amphipods seem to be more important in the 
winter and spring in some areas (Munro and Clemens 1931; Sealy 1975; 
Krasnow and Sanger 1982; Sanger 1983, 1987; Carter 1984; Carter and 
Sealy 1990; Vermeer 1992; Burkett 1995).
    Prior to euroamerican settlement in the Pacific Northwest, nesting 
habitat for the marbled murrelet was well-distributed, particularly in 
the wetter portions of its range in Washington, Oregon, and California. 
This habitat was generally found in large, contiguous blocks (Ripple 
1994) as described under the Management Considerations section of this 
rule. The Recovery Team and others (Ralph et al. 1995b) considered the 
loss of nesting habitat to be one of the primary factors limiting 
current population size from British Columbia to California.
    Areas where marbled murrelets are concentrated at sea during the 
breeding season are likely determined by a combination of terrestrial 
and marine conditions. However, nesting habitat appears to be the most 
important factor affecting marbled murrelet distribution and numbers. 
Recent marine survey data confirm earlier conclusions (60 FR 40892) 
that marine observations of murrelets during the nesting season 
generally correspond to the largest remaining blocks of suitable forest 
nesting habitat (Nelson et al. 1992; Ralph et al. 1995b; Ralph and 
Miller 1995; Strong 1995; Varoujean et al. 1994). For example, suitable 
nesting habitat data from aggregated GIS databases (S. Holzman, U.S. 
Fish and Wildlife Service, pers. comm. 1996) were overlain on the 
aerial survey data provided by Varoujean et al. (1994) and the boat 
survey data provided by Strong (1995). Highest densities of murrelets 
seen in 1992, 1993, 1994, and 1995 closely corresponded with the 
presence of large blocks of suitable nesting habitat on the coasts of 
northern coastal Washington and central and southern coastal Oregon.
    Consistent with Varoujean et al.'s (1994) 1993 and 1994 aerial 
surveys, Thompson (1996) found murrelets to be more numerous along 
Washington's northern outer coast and less abundant along the southern 
coast. He reported that this distribution appears to be correlated with 
(1) proximity of old growth forest, (2) the distribution of rocky 
shoreline/substrate versus sandy shoreline/substrate, and (3) abundance 
of kelp; his analysis of these variables is continuing. In British 
Columbia, Rodway et al. (1995) observed murrelets aggregating on the 
water close to breeding areas at the beginning of the breeding season 
and, for one of their two study areas, again in July as young were 
fledging. Burger (1995) reported that the highest at-sea murrelet 
densities in both 1991 and 1993 were seen immediately adjacent to two 
tracts of old-growth forest, while areas with very

[[Page 26259]]

low densities of murrelets were adjacent to heavily logged watersheds.
    In contrast, where nesting habitat is limited in southwest 
Washington, northwest Oregon, and portions of California, few marbled 
murrelets are found at sea during the nesting season (Ralph and Miller 
1995; Ralph et al. 1995b; Strong 1995; Varoujean and Williams 1995; 
Thompson 1996). The area between the Olympic Peninsula in Washington 
and Tillamook County in Oregon (160 kilometers (100 miles)) has few 
occupied sites or sightings at sea of marbled murrelets. In California, 
approximately 480 kilometers (300 miles) separate the large breeding 
populations to the north in Humboldt and Del Norte Counties from the 
southern breeding population in San Mateo and Santa Cruz Counties. 
Currently this reach contains few marbled murrelets during the breeding 
season; however, the area likely contained significant numbers of 
marbled murrelets before extensive logging (Paton and Ralph 1988, 
Larsen 1991).
    In addition to the proximity of suitable nesting habitat, it is 
likely that marine factors such as prey abundance influence the local 
distribution of breeding murrelets (Ralph and Miller 1995; Strachen et 
al. 1995; Strong 1995). The influence of prey distribution and 
abundance on the distribution of other alcids has been well documented 
(Bradstreet and Brown 1985). In general, nesting murrelets, which must 
return to their nest at least once per day, must balance the energetic 
costs of foraging trips with the benefits for themselves and their 
young (Skutch 1979; Ydenberg 1989; USFWS 1995a). Therefore, breeding 
adults are energetically justified in taking relatively long foraging 
trips only when they can gain access to high quality foraging areas 
(Bradstreet and Brown 1985; Gaston 1985; Carter and Sealy 1990). 
Breeding murrelets are known to cover large areas at sea to take 
advantage of foraging opportunities (Carter and Sealy 1990; Ralph and 
Miller 1995; Rodway et al. 1995). Therefore, use of marine habitat is 
constrained during the breeding season by its distance from nesting 
habitat and the quality of forage resources available. This is 
consistent with the observed juxtaposition of suitable nesting habitat 
and distribution of murrelets during the breeding season described 
above, and it may explain the differences observed in marine 
distribution patterns between murrelets and other non-forest nesting 
seabirds (Varoujean et al. 1994). During years of low prey 
availability, the distance from nesting areas to adequate foraging 
areas is probably a critical determinant of reproductive success (USFWS 
1995a).
    Marbled murrelets can be adversely affected by impacts to their 
nesting habitat, marine foraging habitat, and food supply, as well as 
direct mortality from human activities such as oil spills and gillnet 
fisheries. These impacts, and the resulting decline from historical 
population levels, formed the basis for the listing of the species as 
threatened in 1992 (57 FR 45328). Based on an analysis of likely ranges 
of fecundity and survivorship of this species, Beissinger (1995) 
developed a population model that estimated that marbled murrelets in 
Washington, Oregon, and California may be declining at a rate between 4 
and 6 percent per year. These results are consistent with the evidence 
of a long-term decline from historical populations.
    This decline may be a result of several factors. In addition to 
habitat loss and fragmentation, which may reduce nesting success, 
declines may be exacerbated by high mortality rates of the young of the 
year prior to reaching the ocean, and high mortality rates of juveniles 
and adults in the marine and terrestrial environments.
    Marbled murrelets are believed to be highly vulnerable to predation 
when on the nesting grounds, and the species has evolved a variety of 
morphological and behavioral characteristics indicative of selection 
pressures from predation (Ralph et al. 1995b). For example, plumage and 
eggshells exhibit cryptic coloration, and adults fly to and from nests 
by indirect routes and often under low-light conditions (Nelson and 
Hamer 1995a). Potential nest predators include the common raven (Corvus 
corax), Steller's jay (Cyanocitta stelleri), American crow (Corvus 
brachyrhynchos), gray jay (Perisoreus canadensis), great horned owl 
(Bubo virginianus), sharp-shinned hawk (Accipiter striatus), Cooper's 
hawk (Accipiter cooperii), northern goshawk (Accipiter gentilis), 
raccoon (Procyon lotor), marten (Martes americana), Townsend chipmunk 
(Eutamias townsendii), northern flying squirrel (Glaucomys sabrinus), 
Douglas squirrel (Tamiasciurus douglasi), and fisher (Martes pennanti) 
(Marzluff et al. 1996). Ravens, Steller's jays, and possibly great 
horned owls are known predators of eggs or chicks (Nelson and Hamer 
1995b).
    From 1974 through 1993, of those marbled murrelet nests in 
Washington, Oregon, and California where success/failure was 
documented, approximately 64 percent of the nests failed. Of those 
nests, 57 percent failed due to predation (Nelson and Hamer 1995b). The 
relatively high predation rate could be biased because nests near 
forest edges may be more easily located by observers and more 
susceptible to predation and because observers may attract predators. 
Hamer and Nelson (1995b) believed that researchers had minimal impacts 
on predation in most cases because the nests were monitored from a 
distance and relatively infrequently, and precautions were implemented 
to minimize predator attraction.
    Several possible reasons exist for the high observed predation 
rates of marbled murrelet nests. The first possibility is that these 
high predation rates are normal, although it is unlikely that a stable 
population could have been maintained under the predation rates 
presently being observed (Beissinger 1995).
    Another reason could be that populations of marbled murrelet 
predators such as corvids (jays, crows, and ravens) and great horned 
owls are increasing in the western United States, largely in response 
to habitat changes and food sources provided by humans (Robbins et al. 
1986; Rosenberg and Raphael 1986; Johnson 1993; Marzluff et al. 1994, 
1996; National Biological Service 1996), resulting in increased 
predation rates on marbled murrelets. It has also been proposed that 
creation of excessive forest edge habitat may increase the 
vulnerability of murrelet nests to predation and ultimately lead to 
higher rates of predation. Edge effects have been implicated in 
increased forest bird nest predation rates for other species of birds 
(Chasko and Gates 1982; Yahner and Scott 1988).
    The potential relationship between forest fragmentation, edge, and 
adverse effects on forest nesting birds has received increased 
attention during the last few decades. In a comprehensive review of the 
many studies on this topic, Paton (1994) concluded that ``strong 
evidence exists that avian nest success declines near edges.'' Small 
patches of habitat have a greater proportion of edge than do large 
patches of the same shape (Schieck et al. 1995). However, Paton (1994) 
noted that many of these studies involved lands where forests and 
agricultural or urban areas interface, or they involved experiments 
with ground nests that are not readily applicable to canopy nesters 
such as marbled murrelets. Paton (1994) therefore stressed the need for 
studies specific to forests fragmented by timber harvest in the Pacific 
Northwest and elsewhere.
    Some research on this topic has been conducted in areas dominated 
by timber production and using nests located off the ground (Ratti and 
Reese 1988;

[[Page 26260]]

Rudnicky and Hunter 1993; Marzluff et al. 1996; Vander Haegen and 
DeGraaf in press). Vander Haegen and DeGraaf (in press) found that 
nests in shrubs less than 75 meters from an edge were three times as 
likely to be depredated than nests greater than 75 meters from an edge. 
Likewise, Rudnicky and Hunter (1993) found that shrub nests on the 
forest edge were depredated almost twice as much as shrub nests located 
in the forest interior. They also observed that shrub nests were taken 
primarily by avian predators such as crows and jays, which is 
consistent with the predators believed to be impacting murrelets, while 
ground nests were taken by large mammals such as raccoons and skunks. 
Ratti and Reese (1988) did not find the edge relationship documented by 
Rudnicky and Hunter (1993), Vander Haegen and DeGraaf (in press), and 
others cited in Paton (1994). However, Ratti and Reese (1988) did 
observe lower rates of predation near ``feathered edges'' compared to 
``abrupt'' edges (e.g., clearcut or field edges), and suggested that 
the vegetative complexity of the feathered edge may better simulate 
natural edge conditions than do abrupt edges. These authors also 
concluded that their observations were consistent with Gates and 
Gysel's (1978) hypothesis that birds are poorly adapted to predator 
pressure near abrupt artificial edge zones.
    Studies of artificial and natural nests conducted in Pacific 
Northwest forests also indicate that predation of forest bird nests may 
be affected by habitat fragmentation, forest management, and land 
development (Hansen et al. 1991; Vega 1993; Bryant 1994; C. Chambers, 
Oregon State University, pers. comm. 1994; Nelson and Hamer 1995b; 
Marzluff et al. 1996). Nelson and Hamer (1995b), in the only direct 
measure of marbled murrelet reproductive success, found that successful 
murrelet nests were further from edge than unsuccessful nests. Marzluff 
et al. (1996) are conducting the only experimental predation study that 
uses simulated marbled murrelet nests, and they have documented 
predation of artificial murrelet nests by birds and arboreal mammals. 
Although the study is still continuing, preliminary results indicate 
that proximity to human activity and landscape contiguity may interact 
to determine rate of predation (J. Marzluff, pers. comm. 1996). 
Interior forest nests in contiguous stands far from human activity 
appear to experience the least predation (Marzluff et al. 1996).
    In addition to studies of edge effects, some research has been 
initiated to look at the importance of stand size. Among all Pacific 
Northwest birds, the marbled murrelet is considered to be one of the 
most sensitive to forest fragmentation (Hansen and Urban 1992). 
Murrelet nest stand size in Washington, Oregon, and California varied 
between 3 and 1,100 hectares (7 and 2,717 acres) and averaged 206 
hectares (509 acres) (Hamer and Nelson 1995b). Nelson and Hamer (1995b) 
found that successful murrelets tended to nest in larger stands than 
did unsuccessful murrelets, but these results were not statistically 
significant. Miller and Ralph (1995) compared murrelet survey detection 
rates among four stand size classes in California. Recording a 
relatively consistent trend, they observed that a higher percentage of 
large stands (33.3 percent) had occupied detections when compared to 
smaller stands (19.8 percent), while a greater percentage of the 
smallest stands (63.9 percent) had no presence or occupancy detections 
when compared to the largest stands (52.4 percent) (Miller and Ralph 
1995). However, these results were not statistically significant, and 
the authors did not conclude that murrelets preferentially select or 
use larger stands. The authors suggested the effects of stand size on 
murrelet presence and use may be masked by other factors such as stand 
history and proximity of a stand to other old-growth stands. Schieck et 
al. (1995) found that murrelet presence and abundance was positively 
correlated with old-growth stand size in British Columbia, but their 
data were not statistically significant. Rodway et al. (1993) 
recommended caution when interpreting murrelet detection data, such as 
that used by Miller and Ralph (1995) and Schieck et al. (1995), because 
numbers of detections at different sites may be affected by variation 
caused by weather, visibility, and temporal shifts.
    In addition to stand size, general landscape condition may 
influence the degree to which marbled murrelets nest in an area. In 
Washington, marbled murrelet detections increased when old-growth/
mature forests comprised more than 30 percent of the landscape (Hamer 
and Cummins 1990). Hamer and Cummins (1990) found that detections of 
marbled murrelets decreased in Washington when the percentage of clear-
cut/meadow in the landscape increased above 25 percent. Additionally, 
Raphael et al. (1995) found that the percentage of old-growth forest 
and large sawtimber was significantly greater within 0.8-kilometer 
(0.5-mile) of sites (203-hectare (501-acre) circles) that were occupied 
by murrelets than at sites where they were not detected. Raphael et al. 
(1995) suggested tentative guidelines based on this analysis that sites 
with 35 percent old-growth and large sawtimber in the landscape are 
more likely to be occupied. In California, Miller and Ralph (1995) 
found that the density of old-growth cover and the presence of coastal 
redwood were the strongest predictors of murrelet presence.
    Although ongoing research should shed more light on the specific 
factors that affect murrelet nest predation and stand size preferences, 
the best available information strongly suggests that marbled murrelet 
reproductive success may be adversely affected by forest fragmentation 
associated with certain land management practices. Based on this 
information, the Service concludes that the maintenance and development 
of suitable habitat in relatively large contiguous blocks as described 
in this rule and the draft Marbled Murrelet (Washington, Oregon, and 
California Population) Recovery Plan (draft Recovery Plan) (USFWS 
1995a) will contribute to the recovery of the marbled murrelet. These 
blocks of habitat should contain the structural features and spatial 
heterogeneity naturally found at the landscape level, the stand level, 
and the individual tree level in Pacific Northwest forest ecosystems 
(Hansen et al. 1991; Hansen and Urban 1992; Ripple 1994; Bunnell 1995; 
Raphael et al. 1995; Schieck et al. 1995).
    In addition to predation at the nest, adult and juvenile murrelets 
are vulnerable elsewhere in the terrestrial and marine environments. 
For example, in the terrestrial environment adult marbled murrelets 
have been preyed upon by sharp-shinned hawks, peregrine falcons (Falco 
peregrinus), bald eagles (Haliaeetus leucocephalus), and possibly 
merlins (F. columbarius) (Marks and Naslund 1994).
    In the marine environment, oil spills and commercial net fisheries 
adversely affect marbled murrelets. Clean water is important for 
survival and completion of the murrelet's life cycle and for the 
conservation of the species. Clean, unpolluted water is essential for 
maintaining the health of individual marbled murrelets and prey 
species, and for providing areas for social interactions and other 
behaviors.
    Marbled murrelets have a high vulnerability to oiling, and oil 
spills have had catastrophic effects when large spills have occurred in 
the vicinity of murrelet concentrations. Impacts have been particularly 
severe in Prince William Sound in Alaska, western Washington, and 
central California (Carter and Kuletz 1995). The 45 marbled murrelets 
recovered after the

[[Page 26261]]

Tenyo Maru spill in 1991 at the mouth of the Strait of Juan de Fuca in 
Washington was the greatest number of murrelets recovered in any oil 
spill, with the exception of the Exxon Valdez oil spill, and 
represented a significant portion of the local population (Carter and 
Kuletz 1995). Oil spills may also affect forage fish populations (Irons 
1992; Oakley and Kuletz 1994; Piatt and Anderson In press), reduce 
reproductive success, and disrupt breeding activity (Carter and Kuletz 
1995). Chronic oil pollution can cause mortality through oiling and 
ingestion of oil. Other forms of pollution may also affect birds 
directly through toxic effects on their food supply.
    Mortality of marbled murrelets from entanglement and drowning in 
fishing nets has declined in recent years in Washington, Oregon, and 
California, as fishing effort has declined and regulations to reduce 
mortality have been implemented. However, mortality is still a concern, 
particularly in Washington. Gillnet fisheries are most significant as a 
threat to murrelets in the marine environment in Washington, although 
closures of some areas, specifically to protect marbled murrelets, were 
implemented in the 1995 season (USFWS 1995b, 1995c). Gillnet fisheries 
no longer occur in Oregon, with the exception of those in the Columbia 
River. In California, fishing regulations protect most murrelets from 
this type of mortality (Carter et al. 1995).
    Gillnet fisheries may occur at the mouth of the Columbia River, in 
Willapa Bay, Grays Harbor, the Strait of Juan de Fuca, and Puget Sound, 
although fishing efforts in coastal fisheries have been greatly reduced 
because of depressed salmon (Oncorhynchus spp.) runs. An observer 
program in 1994 in the all-citizens and Tribal sockeye salmon 
(Oncorhynchus nerka) drift gillnet fishery of north Puget Sound, which 
is the most significant fishery in Puget Sound, estimated an 
entanglement of 15 murrelets, with a range of 2 to 59 murrelets (Pierce 
et al. 1996). A National Marine Fisheries observer program for marine 
mammals on the outer coast fisheries of Washington, where low numbers 
of marbled murrelets are present, did not document marbled murrelet 
mortality (Jeffries and Brown 1993). However, a number of entangled 
birds of the Alcidae family were not identified to species. 
Entanglement in other Washington drift net and set gillnet fisheries 
has also been documented (Speich and Wahl 1989; Craig and Cave 1994; 
BIA 1994; J. Grettenberger, USFWS, pers. comm. 1995). Observer programs 
in 1993 and 1994 in Puget Sound salmon purse seine fisheries indicated 
that entanglement rates of marbled murrelets were much lower with this 
gear type (Natural Resources Consultants 1995). To date, there has not 
been any documented murrelet mortalities from gillnet fisheries at the 
mouth of the Columbia River.
    It is likely that marbled murrelets, like many other seabirds, are 
affected by fluctuations in marine environmental conditions such as El 
Nino events (USFWS 1995a). In general, increased mortality of adult 
seabirds and decreased reproductive efforts have been linked with El 
Nino episodes when food supplies are depressed (Schrieber and Schrieber 
1984; Hodder and Graybill 1985; Boekelheide et al. 1990), although 
there may be marked differences in effects across regions and among 
species with different foraging styles (Hatch 1987). Marbled murrelets 
are relatively opportunistic foragers and probably have a great 
flexibility in prey choice (USFWS 1995a). This capability may enable 
them to respond, to some degree, to changes in prey availability caused 
by fluctuating environmental conditions (USFWS 1995a). In general, 
unfavorable conditions can result in adult mortality and reduced 
productivity. However, a seabird's relatively long life span is an 
adaptation which allows an individual to reproduce successfully despite 
adverse conditions during its lifetime. This life history strategy 
serves to maintain a population despite environmental fluctuations 
(USFWS 1995a). However, cumulative impacts (including nest habitat 
loss, oil spills, etc.), in addition to repeated El Nino events in 
localized areas over a short time period could cause serious population 
declines or extirpations (USFWS 1995a).

Management Considerations

    Marbled murrelets are found in forests containing a variety of 
forest structure, which is in part the result of varied management 
practices and natural disturbance (Hansen et al. 1991; McComb et al. 
1993). In many areas, management practices have resulted in 
fragmentation of the remaining older forests and creation of large 
areas of younger forests that have yet to develop habitat 
characteristics suitable for marbled murrelet nesting (Hansen et al. 
1991). Past and current forest management practices have also resulted 
in a forest age distribution skewed toward younger even-aged stands at 
a landscape scale (Hansen et al. 1991; McComb et al. 1993).
    In many portions of the range of the marbled murrelet during the 
last 50-70 years, forest management has concentrated on clear-cut 
logging (Hansen et al. 1991). After forests are clear-cut, the sites 
are traditionally replanted to a single or few tree species and 
maintained as even-aged stands for maximum wood-fiber production. Site-
preparation and management activities may further decrease species 
diversity (Hansen et al. 1991). These methods include prescribed 
burning and the use of herbicides or mechanical methods to control 
competing vegetation.
    Prior to the widespread application of clearcut timber harvest, 
historical logging practices in some portions of the species' range 
consisted of more selective timber harvest, leaving remnant patches of 
forests of varying ages with older forest characteristics. The uneven-
aged management practices used in these areas usually resulted in more 
diverse forests that may currently provide some nesting habitat where a 
few trees containing suitable marbled murrelet nesting structure remain 
(Hansen et al. 1991).
    Current and historic loss of marbled murrelet nesting habitat is 
generally attributed to timber harvest and land conversion practices, 
although, in some areas, natural catastrophic disturbances such as 
forest fires have caused losses (Hansen et al. 1991; Ripple 1994; 
Bunnell 1995). Reduction of the remaining older forest has not been 
evenly distributed in western Washington, Oregon, and California. 
Timber harvest has been concentrated at lower elevations and in the 
Coast Ranges (Thomas et al. 1990), generally overlapping the range of 
the marbled murrelet.
    Habitat for marbled murrelets has been generally declining since 
the arrival of European settlers. Bolsinger and Waddell (1993) 
estimated that old-growth forest in Washington, Oregon, and California 
has declined by two-thirds statewide during the last five decades. 
Information specific to the range of the marbled murrelet is not 
available. Historic forest conditions have been estimated for western 
Washington and Oregon by several authors. Marbled murrelet habitat 
represents a significant portion of area included in these estimates; 
therefore, trends in habitat are assumed to follow the same general 
pattern identified for the larger area.
    Although the extent of mature and old-growth forest before the 
1800s is difficult to quantify, western Washington and Oregon are 
estimated to have been covered by approximately 9.7 to 12.8 million 
hectares (24 to 32 million acres) of forest at the time of euroamerican 
settlement in the early to

[[Page 26262]]

mid-1800s, of which about 5.6 to 7.9 million hectares (14 to 20 million 
acres) (60 to 70 percent) are estimated to have been old-growth 
(Society of American Foresters Task Force 1983; Spies and Franklin 
1988; Morrison 1988; Norse 1988; Booth 1991; Ripple 1994). As of 1991, 
there were approximately 1.4 million hectares (3.4 million acres) of 
old-growth forest remaining in western Washington and Oregon, an 82 
percent reduction from estimated prelogging levels (Booth 1991).
    Estimates for a similar time period in northwestern California are 
not as precise, but suggest there were between 526,000 and 1.3 million 
hectares (1.3 and 3.2 million acres) of old-growth Douglas-fir/mixed 
conifer forest and approximately 890,000 hectares (2.2 million acres) 
of old-growth coastal redwood forest (Society of American Foresters 
Task Force 1983; Laudenslayer 1985; Fox 1988; California Department of 
Forestry and Fire Protection 1988; Morrison 1988). Currently there are 
approximately 28,000 hectares (70,000 acres) of old-growth coastal 
redwood forest remaining in California (Larsen 1991).
    Some of the forests that were affected by past natural 
disturbances, such as forest fires and windthrow, currently provide 
suitable nesting habitat for marbled murrelets because they retain 
scattered individual or clumps of large trees that provide structure 
for nesting (Hansen et al. 1991; McComb et al. 1993; Bunnell 1995). 
This is particularly true in coastal Oregon where extensive fires 
occurred historically. Marbled murrelet nests have been found in 
remnant old-growth trees in mature forests in Oregon.
    Forests providing suitable nesting habitat and nest trees generally 
require 200 to 250 years to develop characteristics that supply 
adequate nest platforms for marbled murrelets. This time period may be 
shorter in redwood and western hemlock forests and in areas where 
significant remnants of the previous stand remain. Intensively managed 
forests in Washington, Oregon, and California have been managed on 
average cutting rotations of 70 to 120 years (USDI 1984; USDA 1988). 
Cutting rotations of 40 to 50 years are common for some private lands. 
Timber harvest strategies on Federal lands and some private lands have 
emphasized dispersed clear-cut patches and even-aged management. Forest 
lands that are intensively managed for wood fiber production are 
generally prevented from developing the characteristics required for 
marbled murrelet nesting. Suitable nesting habitat that remains under 
these harvest patterns is highly fragmented.

Previous Management Efforts

    Since 1990, several different approaches to management of older 
forests and their associated species (including marbled murrelets) have 
been developed through various Federal efforts. These include the 
Interagency Scientific Committee's Conservation Strategy for the 
Northern Spotted Owl (Thomas et al. 1990), the Scientific Panel on Late 
Successional Forest ecosystems commissioned by the U.S. House of 
Representatives (Johnson et al. 1991), the designation of spotted owl 
critical habitat by the Service (57 FR 1796), and the U.S. Forest 
Service's (Forest Service) Scientific Analysis Team Report (Thomas et 
al. 1993). All of these efforts would have provided some level of 
protection to marbled murrelets but most did not address murrelets 
specifically or provide a framework for a specific marbled murrelet 
management strategy.
    In July 1993, the Service, Forest Service, U.S. Bureau of Land 
Management, National Park Service, National Marine Fisheries Service, 
and U.S. Environmental Protection Agency released the Report of the 
Forest Ecosystem Management Assessment Team (FEMAT Report) (USDA et al. 
1993a). Information from this report was used in developing the Final 
Supplemental Environmental Impact Statement on Management of Habitat 
for Late-Successional and Old-Growth Forest Related Species Within the 
Range of the Northern Spotted Owl (USDA et al. 1993b) and the Record of 
Decision for Amendments to the Forest Service and Bureau of Land 
Management Planning Documents Within the Range of the Northern Spotted 
Owl (ROD). This ROD is referred to as the Northwest Forest Plan (USDA 
and USDI 1994). The FEMAT report and ROD provide a specific marbled 
murrelet management strategy for Federal lands.
    Within the range of the marbled murrelet, the Northwest Forest Plan 
designates a system of Late-Successional Reserves, which provides large 
areas expected to eventually develop into contiguous, unfragmented 
forest. In addition to Late-Successional Reserves, the Northwest Forest 
Plan designates a system of Adaptive Management Areas, where efforts 
focus on answering management questions, and matrix areas, where most 
forest production occurs. Administratively withdrawn lands, as 
described in the individual National Forest or Bureau of Land 
Management land use plans, are also part of the Northwest Forest Plan.
    Specific measures in the Northwest Forest Plan protect all occupied 
murrelet sites on Federal lands outside of the Federal reserve system. 
These measures include surveys prior to activities that may affect 
habitat and protection of contiguous marbled murrelet nesting and 
recruitment habitat (stands capable of becoming suitable nesting 
habitat within 25 years) within 0.8-kilometer (0.5-mile) of areas 
occupied by murrelets.
    An assessment of population viability of marbled murrelets was 
conducted by the FEMAT. The assessment group concluded that ``We 
believe there is only about a 60 percent likelihood (with a range of 50 
to 75 percent) that the marbled murrelet population on Federal lands 
would be stable and well distributed after 100 years, regardless of 
which option is selected.'' An additional assessment based only on the 
projected habitat condition at 100 years concluded that there was an 80 
percent likelihood that nesting habitat would be well distributed on 
Federal lands at 100 years under the option most similar to the current 
Northwest Forest Plan.
    The Service recognizes the value of the Northwest Forest Plan (USDA 
and USDI 1994) and acknowledges its integral role in marbled murrelet 
conservation. The Northwest Forest Plan complements this critical 
habitat designation by stressing the need for protection of large, 
unfragmented areas of suitable nesting habitat that are well-
distributed throughout the species' range, with special emphasis on 
areas close to the marine environment.
    Concurrently with the implementation of the Northwest Forest Plan, 
the Marbled Murrelet Recovery Team continues to work on a Recovery Plan 
that will outline a strategy for recovering the species. The Recovery 
Plan, which builds on the Northwest Forest Plan, also addresses 
management needs on non-Federal lands and in the marine environment.
    The Marbled Murrelet Recovery Team is completing a final Recovery 
Plan that will outline a strategy for recovering the species. The draft 
Recovery Plan (USFWS 1995a) suggested the establishment of six Marbled 
Murrelet Conservation Zones where viable populations of murrelets 
should be maintained in Washington, Oregon, and California. The 
Recovery Team would designate the Marbled Murrelet Conservation Zones 
to address differing needs for recovery actions in portions of the 
marbled murrelet's range and to maintain well-distributed populations. 
The zones are generally described as follows: (1) the Puget Sound 
Conservation Zone includes all the waters of Puget Sound, the eastern 
waters of the Strait of Juan de Fuca and

[[Page 26263]]

associated inland habitat extending 80 km (50 miles) from eastern Puget 
Sound and bisecting of the Olympic Peninsula; (2) the Western 
Washington Coast Range Conservation Zone includes the outer coast of 
Washington, the western waters of the Strait of Juan de Fuca and 
associated inland habitat extending inland to the midpoint of the 
Olympic Peninsula and in southwest Washington as far as 80 km (50 
miles) from the Pacific Ocean shoreline; (3) the Oregon Coast Range 
Conservation Zone includes most of the coastal waters of Oregon 
(between the Columbia River and Coos Bay) within 2 km (1.2 miles) of 
the shoreline and associated inland habitat extending inland a distance 
of 56 km (35 miles); (4) the Siskiyou Coast Range Conservation Zone 
includes a portion of the coastal waters of Oregon and California 
(between Coos Bay, Oregon and the southern boundary of Humboldt County, 
California) within 2 km (1.2 miles) of the shoreline and associated 
inland habitat extending inland a distance of 56 km (35 miles) from the 
Pacific Ocean shoreline; (5) the Mendocino Conservation Zone includes a 
portion of the California coastal waters (from the Humboldt County line 
to the mouth of San Francisco Bay) within 2 km (1.2 miles) of the 
shoreline and associated inland habitat extending inland a distance of 
up to 40 km (25 miles) from the Pacific Ocean shoreline; and (6) the 
Santa Cruz Mountains Conservation Zone includes a portion of the 
central California coastal waters (from the mouth of San Francisco Bay 
to Point Sur, Monterey County) within 2 km (1.2 miles) of the shoreline 
and associated inland habitat extending inland a distance of up to 24 
km (15 miles) from the Pacific Ocean shoreline (USFWS 1995a).
    In the marine environment, several laws apply that benefit 
murrelets directly or indirectly. The Oil Pollution Act of 1990 
addresses the development of a national planning and response system 
for spills in marine and freshwater environments. A variety of planning 
efforts are underway that address responses to worst-case discharges of 
oil or hazardous substances, and mitigation or prevention of a 
substantial threat of discharge from a vessel, offshore facility, or 
onshore facility. Planning efforts include the development of a 
national contingency plan, regional area contingency plans, and local 
geographic response plans. The Service has worked extensively with the 
U.S. Coast Guard, industry representatives, local response communities, 
and other State, Federal, and Tribal natural resource trustees to 
develop area contingency plans and geographic response plans for 
Pacific coastal areas. These plans address mechanical recovery, use of 
dispersants, in-situ burning, shoreline cleanup, protection of 
sensitive areas, and protection, rescue, and rehabilitation of fish and 
wildlife. These planning efforts and associated spill exercises should 
help prevent or minimize the impact of spills on natural resources.
    Several other marine laws address threats to murrelets. These 
include the Clean Water Act, which regulates the discharge of pollution 
into marine waters and establishes National Contingency plans to 
minimize damage from oil spills; the Coastal Zone Management Act, which 
establishes the Coastal Nonpoint Source Pollution Control Program; the 
Marine Protection, Research and Sanctuaries Act, which restricts ocean 
dumping of waste, including dredged materials, and establishes marine 
sanctuaries; and the Outer Continental Shelf Act, which regulates 
offshore oil development.
    Mortality of marbled murrelets in commercial net fisheries in 
Washington is being addressed through changes in State and Tribal 
regulations. In 1995, the State of Washington and the Tribes instituted 
area closures in a number of areas with high densities of marbled 
murrelets to reduce the potential for entanglement. In 1995, the first 
year of a 2-year study to evaluate modified gillnets designed to reduce 
seabird entanglement was completed, and the initial results were 
encouraging (Melvin and Conquest 1996). Research was also conducted in 
1995 to evaluate the extent of fisheries/murrelet overlap and factors 
that affect entanglement. Educational programs have been implemented 
that provide material to fishermen on marbled murrelet identification 
and distribution. As a result of section 7 consultation, observer 
programs were required in 1993 and 1994 to evaluate and quantify the 
extent of marbled murrelet mortality in purse seine and gillnet salmon 
fisheries (USFWS 1995b, 1995c).
    Finally, the Forest Service published the ``Ecology and 
Conservation of the Marbled Murrelet,'' a compilation of original 
studies and literature reviews that represents the most current 
treatise on marbled murrelets (Ralph et al. 1995a). The document is 
particularly valuable for management, because it has assembled and 
synthesized most of what is known about the marbled murrelet.

Critical Habitat

    Critical habitat is defined in section 3(5)(A) of the Act as ``(i) 
the specific areas within the geographical area occupied by the 
species, at the time it is listed * * * on which are found those 
physical or biological features (I) essential to the conservation of 
the species and (II) which may require special management 
considerations or protection; and (ii) specific areas outside the 
geographical area occupied by a species at the time it is listed * * * 
upon a determination * * * that such areas are essential for the 
conservation of the species.'' 16 U.S.C. 1532(5)(A). The term 
``conservation,'' as defined in section 3(3) of the Act, means ``* * * 
to use and the use of all methods and procedures which are necessary to 
bring any endangered species or threatened species to the point at 
which the measures provided pursuant to this Act are no longer 
necessary * * *'' 16 U.S.C. 1532(3).

Role in Species Conservation

    The use of the term ``conservation'' in the definition of critical 
habitat indicates that its designation would include habitat essential 
to a species' eventual recovery and delisting. However, when critical 
habitat is designated at the time a species is listed or before a 
recovery plan is completed, the Service frequently does not know all of 
the habitat areas that are essential for a species' recovery. Thus, the 
Act provides that critical habitat designations may be revised from 
time to time (16 U.S.C. 1533(a)(3)(B)).
    The designation of critical habitat is only one of several measures 
available to contribute to the conservation of a listed species. 
Critical habitat helps focus conservation activities by identifying 
areas that contain essential habitat features (primary constituent 
elements), thus alerting Federal agencies and the public to the 
importance of an area in the species' conservation. Critical habitat 
also identifies areas that may require special management or 
protection. The identification of these areas may be helpful in 
planning federally regulated land use activities. The added emphasis on 
these areas for conservation of the species may shorten the time needed 
to achieve recovery.
    Critical habitat receives consideration under section 7 of the Act 
with regard to actions carried out, authorized, or funded by a Federal 
agency. As such, designation may affect non-Federal lands only where 
such a Federal nexus exists. Federal agencies must insure that their 
actions are not likely to result in destruction or adverse modification 
of critical habitat. Aside from this added consideration under section 
7, the Act does not provide any additional protection to lands 
designated as critical

[[Page 26264]]

habitat. Designating critical habitat does not create a management plan 
for the areas; does not establish numerical population goals or 
prescribe specific management actions (inside or outside of critical 
habitat); and does not have a direct effect on areas not designated as 
critical habitat. Specific management recommendations for critical 
habitat are addressed in recovery plans, management plans, and in 
section 7 consultation.
    In Washington, specific State Forest Practices rules are triggered 
by Federal critical habitat designation covering private lands. Under 
Forest Practices rules, a forest management activity within designated 
critical habitat is classified as a ``Class IV--special'' forest 
practice. The applicant for the forest practices permit must submit, in 
addition to the usual information for the Forest Practices permit, an 
environmental checklist under the State Environmental Policy Act 
(SEPA). This checklist covers all resources, not just the species or 
critical habitat in question. The Washington Department of Natural 
Resources (WDNR) then makes a threshold determination from this 
information. The WDNR may make a determination of nonsignificance, 
mitigated determination of nonsignificance, or a determination of 
significance. If a determination of nonsignificance or mitigated 
determination of nonsignificance is reached, the action can proceed. If 
a determination of significance is made, preparation of an 
Environmental Impact Statement is required. This includes public 
involvement, and may involve significant time delays and costs. 
However, the State Forest Practices Board has the option to exclude any 
Federal critical habitat from this designation under a Class IV 
special. State regulations exclude from critical habitat, and Class 
IV--Special review requirements, areas covered by a conservation plan 
and permit approved the Service. State agencies are required to conduct 
SEPA review on all State land projects, so the designation of critical 
habitat designation will have less effect on their process.
    In Oregon, State laws and regulations do not recognize critical 
habitat. Therefore, no effect can be attributed to Federal critical 
habitat through Oregon State law for critical habitat designated on 
non-federal land.
    In California, the California Endangered Species Act (CESA) 
contains a similar concept to critical habitat called essential 
habitat. The State does not necessarily designate essential habitat in 
terms of mapped and described areas, as does critical habitat. Laws and 
regulations do not specifically defer to or recognize Federal critical 
habitat. California Department of Fish and Game biologists, in their 
normal CESA and California Environmental Quality Act (CEQA) review of 
proposed activities, may be aware of critical habitat and consider it 
in lieu of essential habitat. However, there is no requirement to do 
so, nor any prescribed manner for treating critical habitat. In the 
absence of critical habitat, State biologists continue to consider the 
concept of essential habitat. While State biologists may use Federal 
critical habitat during CESA and CEQA reviews, the impact is not 
expected to exceed impacts under the above laws in the absence of 
critical habitat.

Primary Constituent Elements

    A designation of critical habitat begins by identifying areas 
essential to conservation of a species. In determining which areas to 
designate as critical habitat, the Service considers those physical and 
biological features essential to a species' conservation and that may 
require special management considerations or protection. Such physical 
and biological features, as stated in 50 CFR 424.12, include, but are 
not limited to, the following:
    (1) Space for individual and population growth, and for normal 
behavior;
    (2) Food, water, air, light, minerals or other nutritional or 
physiological requirements;
    (3) Cover or shelter;
    (4) Sites for breeding, reproduction, rearing of offspring; and
    (5) Habitats that are protected from disturbance or are 
representative of the historic geographical and ecological 
distributions of a species.
    The Service is required to base critical habitat designations on 
the best scientific data available (16 USC 1533(b)(2)). In designating 
critical habitat for the marbled murrelet in Washington, Oregon, and 
California, the Service has reviewed its overall approach to the 
conservation of the species. For a thorough discussion of the ecology 
and life history of this subspecies, see the Service's Biological 
Report (Marshall 1988); the final listing rule published in the Federal 
Register on October 1, 1992 (57 FR 45328); The Status and Conservation 
of the Marbled Murrelet in North America (Carter and Morrison 1992); 
the Biology of the Marbled Murrelet: Inland and at Sea (Nelson and 
Sealy 1995); the draft Recovery Plan (USFWS 1995a); the Ecology and 
Conservation of the Marbled Murrelet (Ralph et al. 1995a); and the 
Ecological Considerations section of this rule.
    The Service has determined that the physical and biological habitat 
features (referred to as the primary constituent elements) associated 
with the terrestrial environment that support nesting, roosting, and 
other normal behaviors are essential to the conservation of the marbled 
murrelet and require special management considerations.
    Within areas essential for successful marbled murrelet nesting, the 
Service has focused on the following primary constituent elements: (1) 
individual trees with potential nesting platforms, and (2) forested 
areas within 0.8 kilometers (0.5 miles) of individual trees with 
potential nesting platforms, and with a canopy height of at least one-
half the site-potential tree height. This includes all such forest, 
regardless of contiguity. These primary constituent elements are 
essential to provide and support suitable nesting habitat for 
successful reproduction of the marbled murrelet.
    Individual nest trees include large trees, generally more than 81 
centimeters (32 inches) dbh with the presence of potential nest 
platforms or deformities such as large or forked limbs, broken tops, 
dwarf mistletoe infections, witches' brooms, or other formations 
providing platforms of sufficient size to support adult murrelets. 
Because marbled murrelets do not build nests, moss or detritus may be 
important to cushion or hold the egg. Platforms should have overhead 
cover for protection from predators and weather, which may be provided 
by overhanging branches, limbs above the nest area, or branches from 
neighboring trees. Based on current information from Washington, 
Oregon, and California, nests have been found in Douglas-fir, coastal 
redwood, western hemlock, western redcedar, or Sitka spruce (Hamer and 
Nelson 1995b).
    On a landscape basis, forests with a canopy height of at least one-
half the site-potential tree height in proximity to potential nest 
trees are likely to contribute to the conservation of the marbled 
murrelet. These forests may reduce the differences in microclimates 
associated with forested and unforested areas (Chen et al. 1992; Chen 
et al. 1993), reduce potential for windthrow during storms (Chen et al. 
1992), and provide a landscape that has a higher probability of 
occupancy by marbled murrelets (Raphael et al. 1995). The site-
potential tree height is the average maximum height for trees given the 
local growing conditions, and is based on species-specific site index 
tables. Nest trees may be scattered or clumped

[[Page 26265]]

throughout the area. Potential nesting areas may contain fewer than one 
suitable nesting tree per acre.
    Within the boundaries of designated critical habitat, only those 
areas that contain one or more primary constituent element are, by 
definition, critical habitat. Areas without any primary constituent 
elements are excluded by definition.

Criteria Used To Identify Critical Habitat

    Several qualitative criteria were considered in the selection of 
specific areas for inclusion in critical habitat. These criteria are 
similar to criteria used in the development of several recent Federal 
management proposals, such as the Scientific Panel (Johnson et al. 
1991) and Northwest Forest Plan (USDA and USDI 1994). The following is 
a description of the criteria considered:
    Suitable Nesting Habitat: The presence of suitable nesting habitat 
as defined in the previous section. Suitable habitat was located 
through the use of specific site knowledge, GIS data, remote sensing 
data, and aerial photos.
    Survey Data: Information about presence/absence and occupancy were 
used to indicate murrelet use areas. Critical habitat units include 
most of the known sites occupied by marbled murrelets on Federal, 
State, county, and private lands. However, known occupied sites may 
represent only a small portion of the population due to the limited 
coverage of past survey efforts.
    Proximity to Marine Foraging Habitat: During the nesting season, 
marbled murrelets forage in the marine environment and return to the 
nest at least once daily carrying a prey item to their young. Foraging 
and nesting habitat areas must be juxtaposed within the flight 
capabilities and energetic limits of the species. Critical habitat 
units were designated taking into account the distance of murrelet 
detections from the marine environment in a given area.
    Large, Contiguous Blocks of Nesting Habitat: In response to the 
problems of fragmentation of suitable habitat, potential increases in 
predation, and reduced reproductive success, the Service concentrated 
on defining critical habitat units in terms of large, contiguous blocks 
of late-successional forest. The Service used the Late-Successional 
Reserve system identified in the Northwest Forest Plan (USDA and USDI 
1994) to the extent possible to provide large blocks of habitat. 
Marbled murrelet locations and habitat were considered in the 
development of these reserves. State, county, private, and city lands 
were included where large blocks of Federal reserve areas were 
insufficient or not available, but where critical habitat was crucial 
to retaining distribution of the species.
    Rangewide Distribution: To maintain the current distribution of the 
species and reduce the impact of catastrophic losses of habitat or 
murrelets, critical habitat units were identified throughout the range 
of the species in the three states. Well distributed critical habitat 
reduces the probability that a natural or human-caused catastrophe 
would threaten the survival or recovery of the species in Washington, 
Oregon, and California. Catastrophes that might threaten the species 
include wildfires, windstorms or oil spills. Given the intense site 
fidelity of many alcid species, maintaining rangewide distribution may 
also be needed to provide potential source populations for the 
recolonization of future habitat.
    Adequacy of Existing Protection and Management: The Service 
considered the existing legal status of lands in designating areas as 
critical habitat. Areas with permanent legal protection of wildlife, 
such as congressionally designated wilderness areas, National Parks, 
and National Wildlife Refuges are not proposed unless specific threats 
were identified that are not addressed by existing management and 
protection. State park regulations vary, but are often more recreation 
oriented, and less restrictive or protective of wildlife.

Designated Areas Identified by Applying Criteria

    Application of the foregoing criteria and consideration of comments 
and information received as a result of the supplemental proposal has 
resulted in the designation of most of the Late-Successional Reserves 
(LSR), as described in the Northwest Forest Plan, on Federal lands 
within the range of the marbled murrelet in Washington, Oregon, and 
California. These areas, as managed under the Northwest Forest Plan, 
should develop into large blocks of suitable murrelet nesting habitat 
given sufficient time. However, LSRs are plan-level designations with 
less assurance of long-term persistence than areas designated by 
Congress. Designation of LSRs as critical habitat compliments and 
supports the Northwest Forest Plan and helps to ensure persistence of 
this management directive over time. In some areas, these large blocks 
of Federal land can provide the necessary contribution for recovery of 
the species. In other areas, Federal ownership is limited and Federal 
lands alone cannot meet recovery needs to reverse the current 
population decline in marbled murrelets and maintain a well-distributed 
population.
    The FEMAT report recognized the limited ability of Federal agencies 
to recover this species on Federal lands alone. ``Although the Forest 
Ecosystem Management Assessment was designed to address only Federal 
lands within the range of the northern spotted owl, the marbled 
murrelet is an example of a species whose life history requirements 
cannot be accommodated only on Federal lands. The marbled murrelet is a 
seabird that nests inland and therefore is influenced by both the 
marine and terrestrial environments. Its nesting range in the t
FR Doc. 96-12647 Endangered and Threatened Wildlife and Plants; Final Designation of Critical Habitat for the Marbled Murrelet
hree-
state area includes land that is south of the range of the northern 
spotted owl. In addition, several areas that are considered key to the 
recovery of the marbled murrelet involve private and state lands'' 
(FEMAT Report at IV-151 and IV-152, USDA et al. 1993a).
    Based on information provided in public comments, including the 
recommendations of the Marbled Murrelet Recovery Team in the draft 
Recovery Plan (USFWS 1995a), the Service is designating selected non-
Federal lands that meet the requirements identified in the Criteria for 
Identifying Critical Habitat section, where Federal lands alone are 
insufficient to provide suitable nesting habitat for the recovery of 
the species.
    Non-Federal lands are designated as critical habitat where Federal 
lands are limited or nonexistent, and where non-Federal lands are 
essential for maintaining marbled murrelet populations and nesting 
habitat. State lands are particularly important in southwestern 
Washington, northwestern Oregon, and California south of Cape 
Mendocino. Small segments of county lands are also included in 
northwestern Oregon and central California. This is consistent with the 
Memorandum of Understanding between the Service and the State of 
California signed in 1991.
    Some private lands are being designated as critical habitat because 
they provide essential elements and occur where Federal lands are very 
limited, although habitat availability on private land is typically 
much more limited than on public lands. These areas include the Arlecho 
Basin, which supports occupied sites in the lowlands of northern 
Washington; land supporting known occupied sites in southwestern 
Washington and in the Siletz River drainage in Oregon; nesting habitat 
and occupied sites for the at-sea murrelet population in the southern 
portion of the Draft Recovery Plan's proposed Marbled Murrelet 
Conservation Zone 4 in California,

[[Page 26266]]

including the Headwaters Forest area; and nesting habitat for the 
central California population. State, county, city, and private lands 
contain the last remnants of nesting habitat for the southern-most 
population of murrelets, which is the smallest, most isolated, and most 
susceptible to extirpation.

Areas Not Designated

    Not all suitable nesting habitat is included in the designated 
critical habitat units. Emphasis has been placed on those areas 
considered most essential to the species' conservation in terms of 
habitat, distribution, and ownership. That does not mean that lands 
outside of designated critical habitat units are not important to the 
marbled murrelet. Some Federal lands outside of designated critical 
habitat will receive additional protection from the marbled murrelet 
conservation measures outlined in the Northwest Forest Plan. Under the 
ROD, all marbled murrelet habitat will be surveyed prior to removal or 
degradation of habitat, and all occupied sites will be protected. The 
Adaptive Management Areas, matrix lands, and administratively withdrawn 
lands contain areas of occupied habitat that would be protected from 
timber harvest.
    Some areas outside this critical habitat designation may prove to 
contain elements important to the recovery of the species. This 
includes several areas recommended in public comment (see Issue 26). 
However, under the Administrative Procedure Act (5 U.S.C. 553), the 
Service cannot finally designate areas which were not included in a 
proposed rule; and the Service was under court order to finalize this 
designation by May 15, 1996. The Service will consider these areas for 
potential inclusion in any future revisions of marbled murrelet 
critical habitat.
    In considering whether tribal lands would be designated as critical 
habitat, the Service gave particular attention to the Federal 
government's trust responsibilities to Native Americans. The Hoopa 
Valley Indian Reservation (Reservation) was considered but not 
designated as critical habitat because no occupied sites have been 
documented after 3 years of surveys on various portions of the 
Reservation. The Reservation contains only a small quantity of 
fragmented marbled murrelet habitat and is surrounded by Federal lands. 
Some of those Federal lands contain high quality habitat supporting 
occupied sites and are either designated as critical habitat or 
protected as a Congressionally Withdrawn Area.
    Three other areas of Tribal land were considered for inclusion in 
critical habitat, including portions of the Quinault and Makah Indian 
Reservations in Washington and lands owned by the Siletz Tribe in 
Oregon. The Makah Indian Reservation was not designated because little 
suitable habitat remains in this area. The Siletz lands support marbled 
murrelets and contain suitable habitat. However, because these parcels 
are small, isolated, and relatively few, they have limited ability to 
contribute to recovery, especially considering the proximity of Federal 
land in the area. Many of these tribal lands contain murrelet occupied 
sites and activities on these areas undergo section 7 consultation 
through the Bureau of Indian Affairs, providing an option for achieving 
essential conservation contributions. Therefore, the Siletz lands were 
not included in the supplemental proposed rule, for any future 
revisions to critical habitat for the marbled murrelet.
    The Quinault lands are considered important to the conservation of 
the marbled murrelet. The North Boundary Area of the Quinault Indian 
Reservation contains large blocks of contiguous, old-growth habitat. 
Much of this habitat currently supports marbled murrelets. However, the 
Quinault lands were not included in the supplemental proposed rule 
after consideration of the Federal government's trust responsibilities 
and the options for achieving essential conservation contributions 
through other alternatives. The Service is still considering the 
appropriateness of designating critical habitat on Quinault lands, for 
any future revisions to critical habitat for the marbled murrelet.
    The Service considered including five marine areas in critical 
habitat. Clean water and accessible foraging opportunities are 
important life history requirements for the marbled murrelet. These 
five areas support the highest concentrations of murrelets during the 
breeding season in Washington, Oregon, and California. One area 
consisted of the waters of Puget Sound and the Strait of Juan de Fuca 
in Washington, including the waters surrounding the San Juan Islands. 
The Service also considered near shore waters (within 2 km (1.2 mi) of 
the shore) along the Pacific coast from Cape Flattery to Point 
Grenville in Washington, from Newport Bay to Coos Bay in Oregon, from 
the California State border to Cape Mendocino in northern California, 
and from Pillar Point to Davenport in central California.
    While these marine areas are very important to the conservation of 
marbled murrelets, the Service does not believe that they require 
special management consideration or protection at this time beyond that 
provided by the existing Federal laws and regulations discussed in the 
Previous Management Efforts section. These laws and regulations 
specifically address reducing the threats identified in the marine 
environment.
    While the draft Recovery Plan clearly indicates that marine habitat 
is important to the survival of marbled murrelets, it also indicates 
that the primary concern with respect to declining murrelet populations 
is loss of nesting habitat. The Service's evaluation of the effects of 
actions in the terrestrial environment focuses on the impacts to the 
species' nesting habitat, although take of murrelets is also addressed. 
With respect to the marine environment the Service is primarily 
concerned with mortality issues.
    Activities or events that adversely affect marbled murrelets at sea 
seem to be more associated with the mortality of individual birds than 
with long-term destruction or adverse modification of habitat. For 
example, gillnet fisheries result in incidental capture of murrelets, 
but may not significantly adversely affect the prey base. Murrelets 
appear to forage opportunistically on available fish, and are likely 
able to respond to minor changes in fish abundance and location.
    Murrelets are also adversely affected by spills of oil and other 
pollutants. Although these events undoubtedly harm the murrelet prey 
base, their principal adverse impact is the death of birds in the area 
of the event. The effects of these events on the murrelet prey base are 
somewhat more difficult to predict than are the effects on any 
murrelets that happen to be in the area. The Service's assessments of 
these events typically relies upon an assessment of the mortality issue 
rather than an assessment of habitat issues such as prey base.
    Many of the threats specifically result in the loss of individuals 
through death or injury. Such effects related to projects authorized, 
funded, or carried out by a Federal agency can and should be considered 
under section 7 of the Act. The Service will continue to monitor marine 
threats and may propose marine critical habitat in the future if 
warranted.

Changes From the Supplemental Proposal

    The Service reviewed public comments, information on forest stands 
provided by landowners during the public comment period, aerial 
photographs, and updated GIS data. The Service dropped areas and 
corrected

[[Page 26267]]

area descriptions accordingly. Generally, the corrections were 
relatively minor adjustments to boundary lines.
    A number of proposed units in southwest Washington on private and 
State lands were reduced in size if it was determined that: (1) primary 
constituent elements were not present or, (2) the area removed was not 
considered necessary for the conservation of the species. The north 
portion of Capital Forest (WA-04-a) was removed because of the lack of 
primary constituent elements, coupled with high levels of motorized 
recreational use that further reduce habitat potential.
    In Oregon, the Elliott State Forest was originally proposed for 
designation as critical habitat. The State of Oregon has since 
completed the Elliott State Forest Habitat Conservation Plan that 
includes provisions for the marbled murrelet and received an incidental 
take permit. This permit describes how the area will be managed for 
murrelets. Therefore, the Service has removed this area from the final 
designation.
    On Federal lands in Oregon, the Service included approximately 100 
acres and deleted approximately 300 acres of land on the Siuslaw 
National Forest at the request of the Forest Service. This change 
reflects a land exchange intended to protect marbled murrelet occupied 
sites. The Service deleted areas managed by the Siskiyou National 
Forest (portions of subunits OR-07-e and OR-07-f); and the Eugene, 
Roseburg and Medford Districts of the Bureau of Land Management 
(subunits OR-04-h, and portions of subunits OR-06-d, OR-04-f, and OR-
04-I) based on survey information provided by the agencies during the 
public comment period. Survey information included the location and 
results (positive and negative) of murrelet surveys in the eastern 
portion of these areas. The survey locations were based on planned 
timber sales and habitat-based surveys in many areas, rather than a 
statistically designed study to determine the inland distribution of 
marbled murrelets. Therefore, the Service was only able to utilize the 
survey information in critical habitat units where the survey effort 
was greatest. The Service interprets lack of detections or occupied 
sites, when coupled with habitat information, to indicate that these 
areas are currently likely to support much lower densities of murrelets 
than areas closer to the coast. The Service does not consider these 
survey data to be sufficient at this time to define the full inland 
distribution of murrelets in these areas and does not propose to change 
the murrelet zones used in the Northwest Forest Plan.
    In California, some portions of proposed critical habitat on 
private and Federal lands in the Siskiyou Coast Range Zone (unit CA-10-
b and the east half of unit CA-10-a) and on city and state lands in the 
Santa Cruz Mountains Zone were dropped based on information provided by 
the landowners and land management agencies or other new information 
available to the Service. These areas were dropped because the Service 
determined that they did not contain the primary constituent elements 
or were not considered essential to the conservation of the species. 
All of Golden Gate National Recreation Area was dropped based on 
information provided by the National Park Service indicating that the 
Federal government owns the timber rights to any potentially suitable 
murrelet habitat within the area. After reviewing this information, the 
Service has determined that Federal lands within the Golden Gate 
National Recreation Area do not require special management.
    Portions of primary constituent element (3) from the supplemental 
rule (forested areas of at least one-half the site-potential tree 
height regardless of the presence of potential nest platforms) have 
been incorporated into primary constituent element (2) in the final 
rule, and the remainder dropped. Forested areas surrounding nest trees 
were retained because they likely contribute to successful reproductive 
efforts by providing the microclimate suitable for maintaining nest 
tree characteristics and potentially reducing predation. The 
contribution of forested areas to successful reproduction likely 
decreases with increasing distance from the nest tree and at some 
distance the contribution becomes indistinguishable. Raphael et al. 
(1995) found an increased chance of occupancy in landscape conditions 
with increased amounts of large saw timber and old growth components 
within a 0.8 km (0.5 mile) radius circle. Specific studies are lacking 
to document the value of forested conditions to marbled murrelet 
nesting beyond the 0.8 km (0.5 mile) radius. Therefore, until these 
studies are completed, it is the best professional judgement of Service 
biologists that forested conditions within 0.8 km (0.5 mile) of a 
potential nest tree contribute more significantly to successful 
reproduction than those beyond this area and the Service has changed 
the primary constituent elements accordingly.

Congressionally Withdrawn Areas

    Congressionally Withdrawn Areas (e.g., wilderness areas and 
national parks) are limited in the range of the marbled murrelet in 
Washington, Oregon, and California. Few wilderness areas are within the 
flight distance of marbled murrelets from the marine environment, 
although those that are provide crucial contributions to the 
conservation of the species. Wilderness areas and national parks 
contain approximately 302,000 hectares (747,000 acres) of marbled 
murrelet nesting habitat, representing 29 percent of the suitable 
nesting habitat on Federal lands in the range of the marbled murrelet. 
However, a substantial portion of the remainder of these areas is 
incapable of producing marbled murrelet nesting habitat because of 
forest composition, lack of forest cover, elevation, and other 
constraints. By themselves, Congressionally Withdrawn Areas are 
incapable of supporting stable and interactive populations of marbled 
murrelets.
    Marbled murrelet habitat in congressionally designated wilderness 
areas, national parks, national monuments (natural areas), and national 
wildlife refuges is generally managed by statutory requirements to 
protect natural ecosystems and for the benefit of wildlife. Thus, 
habitat in these areas does not require special management 
consideration or protection. For example, a potential highway 
realignment through the Redwood National Park in northern California 
could result in the removal of occupied habitat. The Park's statutory 
authority and general management goals, however, are considered 
adequate to conserve the species without the additional designation of 
critical habitat.
    However, not all Congressionally Withdrawn Areas are managed in 
this manner. For example, some national recreation areas may not be 
managed to maintain older forest habitats or may face external actions 
(e.g., outside ownership of mineral or timber rights) which may 
threaten marbled murrelet habitat within the area. One congressionally 
withdrawn area in California, the Golden Gate National Recreation Area, 
was proposed for designation. Area staff indicated that potential 
marbled murrelet habitat within the area might still be subject to 
timber harvest and loss, because the National Park Service does not 
control rights to the standing timber on some parts of the recreation 
area. During the public comment period the National

[[Page 26268]]

Park Service was able to verify that any lands where timber rights may 
not be secure do not contain potentially suitable marbled murrelet 
habitat. Therefore the Recreation Area was dropped from designation 
because murrelet habitat within the area no longer needs special 
management consideration or protection beyond the area's existing 
statutory requirements.
    Several other congressionally designated areas were considered 
important to recovery of the marbled murrelet because of their location 
within the range of the species and presence of suitable nesting 
habitat, but are not designated because they do not require special 
management in light of their existing statutory requirements. These 
include: (1) North Cascades, Olympic, and Mount Rainier National Parks; 
Willapa National Wildlife Refuge; Mount Saint Helens National Volcanic 
Monument; Mount Baker, Noisy Diobsud, Glacier Peak, Boulder River, 
Henry M. Jackson, Alpine Lakes, Clearwater, Norse Peak, Glacial View, 
Tatoosh, Buckhorn, The Brothers, Mount Skokomish, Wonder Mountain, and 
Colonel Bob Wilderness Areas in Washington; (2) Drift Creek, Cummins 
Creek, Rock Creek, Grassy Knob, Wild Rogue, and Kalmiopsis Wilderness 
Areas in Oregon; and (3) the Kalmiopsis, Siskiyou, and Trinity 
Wilderness Areas; Muir Woods National Monument and Point Reyes National 
Seashore in California. Portions of the Smith River National Recreation 
Area in California were not included because they did not contain high-
quality nesting habitat. External threats in these areas are very 
limited, management goals are generally adequate to conserve the 
species, and these areas do not require special management 
consideration or protection beyond their individual statutory 
authorities.

Economic Analysis Summary

    Section 1(b)(2) of the Act requires the Service to consider the 
economic and other relevant impacts of specifying any particular area 
as critical habitat. The Secretary may exclude areas from critical 
habitat if the benefits of exclusion outweigh the benefits of including 
the area in critical habitat, unless failure to designate a specific 
area would result in extinction of the species. The Service contracted 
with ECONorthwest, a consulting firm in Eugene, Oregon, to conduct an 
economic analysis of the potential economic effects of designating 
critical habitat for the marbled murrelet. As required by the Act, the 
report addresses only the incremental economic consequences of the 
proposed critical habitat. It does not address the consequences of 
listing the species or other actions that have been proposed or taken 
to protect marbled murrelets prior to this designation.
    The habitat covered by the designation plays a complex role in the 
regional economy by producing multiple, valuable goods and services, 
including: the marbled murrelet itself; other species, including 
salmon; fresh water; recreational opportunities; and timber. The data 
regarding the designation's impacts on some of these goods and services 
are not sufficient to support a detailed conclusion about whether the 
proposed designation would result in net economic benefits or costs. 
Evidence indicates, however, that the designation's economic benefits 
largely offset, and may even outweigh, its economic costs. The overall 
net effect is expected to be close to zero.
    The designation will have few immediate and direct impacts on the 
economy. The primary effect of critical habitat is through the section 
7 requirement for Federal agencies to avoid the destruction or adverse 
modification of critical habitat through actions they fund, permit, or 
carry out. The Service, with information provided by the cooperating 
Federal agencies, has determined that the designation of critical 
habitat for the marbled murrelet is not likely to significantly 
restrict the activities of any Federal agency, whether on Federal or 
non-federal lands. In particular, although the designation will 
reinforce the efforts of the Forest Service and Bureau of Land 
Management to protect and enhance the terrestrial habitat of the 
marbled murrelet, it will not cause these agencies to manage Federal 
lands in a manner that will have immediate, direct impacts on the flow 
of timber and other goods and services from these lands.
    For non-federal landowners with lands included in this designation, 
the primary potential for an impact of critical habitat will be on 
actions that require a Federal permit or involve Federal funding. One 
of these activities is the issuance of incidental take permits under 
section 10(a) of the Act. The Service works with landowners, at their 
request, in the development of the HCP required for issuance of the 
permit to allow activities to proceed while minimizing and mitigating 
for impacts to listed species. The Service consults under section 7 on 
the issuance of the permit, to ensure the permit will not jeopardize 
the species or adversely modify critical habitat. The Service has 
defined critical habitat for marbled murrelets to exclude lands covered 
by a legally-operative incidental take permit for the species, 
including marbled murrelet incidental take permits that may be issued 
subsequent to the designation. Other permitting or funding agencies 
have indicated that they do not expect critical habitat to have a 
significant effect on permits or funding.
    The designation may, however, lead to changes in the actions of the 
Washington Department of Natural Resources (WDNR), which is required by 
State regulations to take Federal critical habitat designations into 
account when assessing applications for permits to conduct logging and 
other activities. These regulations require WDNR to scrutinize more 
thoroughly the potential impacts on all aspects of the environment--
natural, recreational, cultural, and infrastructural--when a proposed 
activity will occur inside designated critical habitat. However, 
marbled murrelet critical habitat is defined to exclude areas covered 
by marbled murrelet incidental take permits. Washington State Forest 
Practices regulations exclude areas covered by a marbled murrelet 
incidental take permit from this requirement.
    The economy most directly affected by the designation--western 
Washington, western Oregon, and northwestern California--is highly 
diversified and growing rapidly. Any potential loss of jobs should be 
compensated for by other employment opportunities as has happened over 
the last 15 years in this area. Markets are expected to respond 
quickly, whatever the designation's impacts on the timber industry. The 
designation is unlikely to cause any change in the prices of timber and 
derivative products.

Summary of the Exclusion Process

    Under section 4(b)(2) of the Act, the Secretary may exclude any 
area from critical habitat if he determines that the benefits of such 
exclusions outweigh the benefits of specifying such areas as part of 
the critical habitat, unless he determines that the failure to 
designate such areas will result in the extinction of the species 
concerned. To determine whether to include or exclude an area, the 
Service has analyzed the economic and conservation benefits of 
retaining or excluding critical habitat areas, and weighed those 
benefits.
    The economic analysis focused on Federal agencies because the 
primary impact of critical habitat occurs through a Federal nexus. For 
the supplemental proposed rule, the Service contacted all Federal 
agencies operating within the range of the murrelet in Washington, 
Oregon, and California. The Service

[[Page 26269]]

discussed the potential effects of critical habitat and the various 
regulatory activities of the agencies, to assist in determining whether 
the proposed designation would have a potential to affect the agency's 
actions, including funding and permitting activities on non-federal 
lands. Each agency contact was sent a questionnaire requesting 
information on the potential impacts of the designation on any projects 
or activities funded, permitted, or carried out by their agency, 
followed by personal contact. Follow-up contacts were made with the 
various agencies to answer any additional questions. For the final 
rule, updates were requested.
    Several portions of critical habitat were dropped from the proposed 
rule due to new information made available to the Service during the 
public comment period. Because the effects of critical habitat 
designation vary by ownership and State regulation, the Service 
evaluated the effect of the designation on areas defined by state and 
ownership, beginning with critical habitat areas on Federal land in the 
three States. Federal lands are managed under the same requirements, 
through the Northwest Forest Plan. Therefore, potential effects of 
critical habitat are similar for all these lands. Baseline condition of 
Federal lands was established in the Northwest Forest Plan.
    Within each state, the Service examined the potential effects of 
critical habitat on the various ownerships and areas defined by 
differences in the baseline condition. Effects examined included any 
potential effects where Federal permits or funding were involved. In 
addition, any effects of state regulations that tier to Federal 
critical habitat were examined.
    Based on the impacts revealed by the economic analysis summarized 
above, and careful examination of the conservation benefits of the 
critical habitat units, the Service has determined that the overall 
conservation and other benefits to be gained from the designation 
outweigh the benefits of excluding any remaining areas. Therefore, the 
Service did not exclude any areas during this process and has made a 
final determination to designate critical habitat for the marbled 
murrelet. A copy of the economic analysis and description of the 
exclusion process with supporting documents are included in the 
Service's administrative record.

Effects of the Designation

    This designation of critical habitat for the marbled murrelet 
identifies 32 critical habitat units encompassing approximately 
1,573,340 hectares (3,887,800 acres) of Federal and non-Federal lands 
based on information available in the Interagency Geographic 
Information System (GIS). Twenty-two critical habitat units include 
State, county, city, or private lands. See Table 1.

   Table 1.--Designated Critical Habitat by State, Ownership, and Land  
                               Allocation                               
------------------------------------------------------------------------
                                             Hectares          Acres    
------------------------------------------------------------------------
Washington:                                                             
    Federal Lands:                                                      
        Congressionally Withdrawn Lands.             740           1,800
        Late-Successional Reserves......         485,680       1,200,200
    Non-Federal Lands:                                                  
        State Lands.....................         172,720         426,800
        Private Lands...................           1,020           2,500
Oregon:                                                                 
    Federal Lands:                                                      
        Late-Successional Reserves......         541,530       1,338,200
    Non-Federal Lands:                                                  
        State Lands.....................          70,880         175,100
        County Lands....................             440           1,100
        Private Lands...................             350             900
California (Northern):                                                  
    Federal Lands:                                                      
        Late-Successional Reserves......         193,150         477,300
    Non-Federal Lands:                                                  
        State Lands.....................          71,040         175,500
        Private Lands...................          16,360          40,400
California (Central):                                                   
        State Lands.....................          14,080          34,800
        County Lands....................           3,230           8,000
        City Lands......................             400           1,000
        Private Lands...................           1,720           4,200
------------------------------------------------------------------------

    Some small areas of naturally occurring or human-created unsuitable 
habitat (i.e., areas that have never been or will likely never be 
marbled murrelet nesting habitat, such as alpine areas, water bodies, 
serpentine meadows, lava flows, airports, roads, buildings, parking 
lots, etc.) are inside the boundaries of critical habitat units but are 
not affected by the designation because they do not contain primary 
constituent elements. Where possible, these areas were not included 
within the critical habitat boundaries and acreage totals were adjusted 
to reflect the exclusion of this non-suitable habitat. However, many of 
these areas are small and could not be physically identified on the GIS 
maps. Current mapping information does not allow precise identification 
of the location of all forest areas containing primary constituent 
elements. This is particularly true for potential nest trees. These 
trees are often a small component of the forest stands and are not 
recorded on many timber-oriented data systems. The Service used the 
best existing data to locate the forest areas most likely to contain 
the primary constituent elements. Where possible in the time frame 
available, the Service refined the boundaries of the critical habitat 
units to eliminate significant identified areas that do not contain one 
or more of the primary constituent elements based on the best data 
available.
    Efforts by Federal agencies to survey for marbled murrelets have 
been concentrated in areas of proposed

[[Page 26270]]

timber sales or limited research locations. A small fraction of 
suitable nesting habitat has been surveyed to date, and surveys have 
not been uniformly spread throughout the range of the species. 
Therefore, known occupied sites provide only a partial indication of 
the areas used by the species. In addition, there are a significant 
number of known occupied sites within Redwood National Park that are 
not currently on the database and are therefore not reported here. The 
designated critical habitat includes 695 (86 percent) of the 807 known 
occupied sites on Federal lands.
    The Service had limited information about the amount of suitable 
nesting habitat or habitat containing one or more of the primary 
constituent elements on non-Federal lands within the species' range. 
The Service relied on analysis of satellite imagery that does not 
identify small features such as potential nest trees. The Service is 
aware of at least 354 known occupied sites on non-Federal lands, of 
which 218 (61 percent) are included within critical habitat. Several of 
the occupied sites outside of critical habitat are within the Elliott 
State Forest, which is operating under an active incidental take permit 
for murrelets. The Service did receive specific and detailed 
information in the public comments from some non-Federal landowners 
relative to the forest condition on their lands. Based on this 
information, the Service has removed from the designation lands that 
are unlikely to contain either primary constituent element.

Available Conservation Measures

    Two of the principal purposes of the Act, as stated in section 
2(b), are to provide a means to conserve the ecosystems upon which 
endangered and threatened species depend and to provide a program for 
the conservation of listed species. The Act mandates the conservation 
of species through several different mechanisms, such as section 7 
(requiring Federal agencies to ensure that their actions will not 
likely jeopardize the continued existence of the listed species or 
result in the destruction or adverse modification of critical habitat); 
section 9 (prohibition of taking of listed species); section 10 
(habitat conservation plans); and section 6 (cooperative State and 
Federal grants).

Recovery Planning

    Designation of critical habitat does not offer specific direction 
for managing marbled murrelet nesting or foraging habitat and does not 
provide a management or conservation plan for the species. Guidance for 
conservation is generally provided in recovery plans, which usually 
include management recommendations for designated critical habitat. The 
Service continues to work closely with the Marbled Murrelet Recovery 
Team relative to critical habitat.
    Recovery planning is an ``umbrella'' that guides conservation 
activities under the Act and promotes a species' conservation. Recovery 
plans provide guidance, which may include population goals and 
identification of areas that are in need of protection or special 
management. Recovery plans also include management recommendations for 
areas proposed or designated as critical habitat. Critical habitat 
promotes recovery by highlighting areas that should be given additional 
consideration in local planning processes. Critical habitat helps focus 
conservation activities by identifying areas that contain essential 
habitat features (primary constituent elements) and that may require 
special management or protection. Critical habitat complements recovery 
plans by providing a regulatory mechanism when a Federal nexus is 
present to increase immediate protection of primary constituent 
elements and essential areas and preserve options for the long-term 
conservation of the species.

Section 7  Consultation

    Section 7(a)(2) of the Act requires Federal agencies to insure that 
activities they authorize, fund, or carry out are not likely to destroy 
or adversely modify designated critical habitat. This Federal 
responsibility accompanies, and is in addition to, the requirement in 
section 7(a)(2) of the Act that Federal agencies insure that their 
actions are not likely to jeopardize the continued existence of any 
listed species. A Federal agency must consult with the Service if its 
proposed action may affect a listed species or critical habitat. 
Regulations implementing this interagency cooperation provision of the 
Act are codified at 50 CFR 402.
    Destruction or adverse modification of critical habitat is defined 
as ``* * * a direct or indirect alteration that appreciably diminishes 
the value of critical habitat for both the survival and recovery of a 
listed species. Such alterations include, but are not limited to, 
alterations adversely modifying any of those physical or biological 
features that were the basis for determining the habitat to be 
critical.'' 50 CFR 402.02. Jeopardy is defined at 50 CFR 402.02 as any 
action that would be expected to reduce appreciably the likelihood of 
both the survival and recovery of a listed species in the wild. The 
scope of analysis for evaluating the impacts of an activity on marbled 
murrelet critical habitat is the broadly defined unit and conservation 
zone, not each individual acre. The designation of critical habitat 
does not create de facto wilderness or prohibit all human activities 
within the boundaries. Many activities may take place in critical 
habitat without resulting in the destruction or adverse modification of 
the critical habitat.

Section 10  Incidental Take Permits (Habitat Conservation Plans)

    Section 10(a) of the Act authorizes the Service to issue permits 
for the taking of listed species incidental to otherwise lawful 
activities. Incidental take permit applications must be supported by a 
habitat conservation plan (HCP) that identifies conservation measures 
that the permittee agrees to implement for the species to minimize and 
mitigate the impacts of the requested incidental take. The issuance of 
an incidental take permit is a Federal action and is subject to the 
consultation requirements of section 7 of the Act. The Service cannot 
issue an incidental take permit if the HCP would jeopardize any listed 
species, or destroy or adversely modify any critical habitat.
    The Service expects that critical habitat may be used as a tool to 
help identify areas within the range of the murrelet most critical for 
the conservation of the species and the Service will encourage 
development of HCPs for such areas on non-federal lands. The Service 
considers HCPs to be one of the most important methods through which 
non-Federal landowners can resolve endangered species conflicts. The 
Service provides technical assistance and works closely with applicants 
throughout the development of HCPs to help identify special management 
considerations for the murrelet. Several HCP efforts are currently 
underway in areas designated as murrelet critical habitat in 
Washington, Oregon, and California.
    HCPs, coupled with Federal management under the Northwest Forest 
Plan, provide an opportunity to develop a package of sufficient 
management considerations that meet or enhance the conservation of the 
species. Thus, they may remove the need for special management 
consideration or protection, thereby removing the need to designate 
such areas as critical habitat. Therefore, any lands within critical 
habitat that are covered by a legally-operative incidental take permit 
for marbled murrelets based on an approved HCP that addresses 
conservation of the marbled murrelet are excluded from the critical 
habitat

[[Page 26271]]

while the permit is active. The State of Oregon is currently operating 
under an incidental take permit for murrelets on the Elliott State 
Forest, therefore this area has been excluded from critical habitat.

Basis for Section 7 Analysis

    Designation of critical habitat focuses on the primary constituent 
elements within the designated habitat units and their contribution to 
the species' survival and recovery. The evaluation of actions that may 
affect critical habitat for the marbled murrelet would consider the 
effects of a Federal action on any of the factors that were the basis 
for determining the habitat to be critical, including the primary 
constituent elements of potential nest trees and surrounding forest.
    The range of the marbled murrelet has been subdivided by the 
Recovery Team into six Marbled Murrelet Conservation Zones (USFWS 
1995a), as discussed in the Previous Management Efforts section. These 
subdivisions were not based on identification of separate populations 
of marbled murrelets, but rather on the need for potentially different 
recovery actions in various portions of the marbled murrelet's range, 
and the need to maintain well-distributed populations. Marbled 
murrelets within the conservation zones are likely to interact across 
zone boundaries at some level.
    For a wide-ranging species such as the marbled murrelet, where 
multiple critical habitat units are designated, each unit has a 
regional (conservation zone) and range-wide role in contributing to the 
conservation of the species. The basis for an adverse modification 
opinion would be whether a proposed action appreciably reduces the 
ability of critical habitat to function in achieving the regional 
conservation zone goals. In evaluating the effect of a proposed action, 
the Service will analyze the impacts to individual units in light of 
their overall contribution to the survival and recovery of murrelets in 
the conservation zone described in the Previous Management Efforts 
section, and the overall range of the marbled murrelet in Washington, 
Oregon, and California. Thus, an adverse modification finding would be 
based upon a broader inquiry than the mere assessment of adverse 
effects at the local unit level. The loss of populations throughout one 
or more conservation zones, or even a major part of a conservation 
zone, could lead to genetic and demographic isolation of parts of the 
population.

Examples of Proposed Actions

    Section 4(b)(8) of the Act requires, for any proposed or final 
regulation concerning critical habitat, a brief description and 
evaluation of those activities (public or private) that may adversely 
modify such habitat or may be affected by the critical habitat 
designation. Regulations found at 50 CFR 402.02 define destruction or 
adverse modification of critical habitat as a direct or indirect 
alteration that appreciably diminishes the value of critical habitat 
for both the survival and recovery of a listed species. Such 
alterations include, but are not limited to, alterations adversely 
modifying any of those physical or biological features that were the 
basis for determining the habitat to be critical.
    A variety of ongoing or proposed activities that disturb or remove 
primary constituent elements may adversely affect, though not 
necessarily ``adversely modify'' marbled murrelet critical habitat as 
that term is used in section 7 consultations. Examples of such 
activities include, but are not limited to, (1) forest management 
activities which greatly reduce stand canopy closure, appreciably alter 
the stand structure, or reduce the availability of nesting sites; (2) 
land disturbance activities such as mining, sand and gravel extraction, 
construction of hydroelectric facilities and road building, and (3) 
harvest of certain types of commercial forest products (e.g. moss). 
These activities have the following effects on the primary constituent 
elements of murrelet critical habitat:
    (1) Removal or degradation of individual trees with potential 
nesting platforms, or the nest platforms themselves, that results in a 
significant decrease in the value of the trees for future nesting use. 
Moss may be an important component of nesting platforms in some areas.
    (2) Removal or degradation of trees adjacent to trees with 
potential nesting platforms that provide habitat elements essential to 
the suitability of the potential nest tree or platform, such as trees 
providing cover from weather or predators.
    (3) Removal or degradation of forested areas with a canopy height 
of at least one half the site-potential tree height and regardless of 
contiguity, within 0.8 km (0.5 mile) of individual trees containing 
potential nest platforms. This includes removal or degradation of trees 
currently unsuitable for nesting that contribute to the structure/
integrity of the potential nest area (i.e., trees that contribute to 
the canopy of the forested area). These trees provide the canopy and 
stand conditions important for marbled murrelet nesting.
    For a proposed action to result in the destruction or adverse 
modification of critical habitat, it must appreciably diminish the 
value of critical habitat for both the survival and recovery of a 
listed species in the affected conservation zone. Each proposed action 
requiring a section 7 consultation must be evaluated individually, in 
light of the baseline condition of the critical habitat unit and 
conservation zone, unique history of the area, and effect of the impact 
on the critical habitat unit in light of its regional and range-wide 
role in the conservation of the species. Activities that are acceptable 
in one critical habitat unit or conservation zone may cause serious 
effects in another, due to differences in current condition and 
conservation needs. Therefore, the Service cannot provide, in this 
rule, a detailed description of the threshold for future actions that 
would result in the destruction or adverse modification of critical 
habitat applicable throughout the range of the species.
    A variety of activities would not affect the primary constituent 
elements and therefore would not adversely modify critical habitat. 
Such activities would include, but are not limited to, certain 
recreational use and personal-use commodity production (e.g., mushroom 
picking, Christmas tree cutting, rock collecting, recreational fishing 
along inland rivers) and certain commercial commodity production (e.g., 
mushroom picking, brush picking). Actions that affect forest stands not 
within 0.8 km (0.5 miles) of individual trees with potential nesting 
platforms (are not primary constituent elements) also would not 
adversely modify critical habitat, even if they are within the 
boundaries of the area designated as critical habitat.
    Activities that do not affect the primary constituent elements in 
the forests are unlikely to be affected by the designation. However, 
even though an action may not adversely modify critical habitat, it may 
still affect marbled murrelets (e.g. through disturbance) and may, 
therefore, still be subject to consultation under section 7 of the Act.
    Activities conducted according to the standards and guidelines for 
Late-Successional Reserves, as described in the ROD for the Northwest 
Forest Plan would be unlikely to result in the destruction or adverse 
modification of marbled murrelet critical habitat. Activities in these 
areas would be limited to manipulation of young forest stands that are 
not currently marbled murrelet nesting habitat. These forest management 
activities would be

[[Page 26272]]

conducted in a manner that would not slow the development of these 
areas into future nesting habitat, and should speed the development of 
some characteristics of older forest.

Summary of Comments and Recommendations on the Supplemental Proposed 
Rule

    In the August 10, 1995, supplemental proposed rule for designation 
of marbled murrelet critical habitat, the Service requested all 
interested parties to submit information and comments concerning the 
proposal. Additional comments were received at five public hearings 
held on the supplemental proposed rule in Washington, Oregon, and 
California.
    During the public comment period, the Service received 339 written 
comments. In addition, 60 people testified at the public hearings. All 
comments received are part of the record for this designation and are 
available for public review. Issues raised during the public comment 
period that were not addressed in the body of the final rule are 
discussed next.

Legal/Policy

    Issue 1: Two commenters questioned whether the language of a 
temporary injunction granted by Judge Chesney of the United States 
District Court for the Northern District of California expanded the 
scope of activities subject to consultation under section 7 of the Act, 
and therefore the impact of critical habitat on non-federal lands.
    Service Response: Judge Chesney ruled that there was a serious 
question as to whether the Service's advice to a timber company, that 
proposed logging would not result in take of the marbled murrelet in 
violation of section 9 of the Act, was an action subject to section 7 
consultation. On May 7, 1996, the U.S. Court of Appeals for the Ninth 
Circuit reversed Judge Chesney's ruling and concluded that the 
Service's advice to a private entity on compliance with section 9 is 
not an action subject to section 7. Marbled Murrelet v. Babbitt, No. 
95-16945 (9th Cir.).
    A Federal nexus refers to a situation where a Federal agency 
authorizes, funds, or carries out an action.
    Issue 2: One commenter questioned whether the acceptance of Federal 
funding for a project on a portion of a State forest would create a 
Federal nexus for all activities on the forest.
    Service Response: The Federal nexus would apply only to the funded 
activity and related actions. Actions that are interrelated and 
interdependent with the federally-funded activity would be considered 
in the biological opinion and could be subject to modification. Any 
modifications suggested by the Service would, for a non-jeopardy/non-
adverse modification action, be confined to ``minor'' changes which 
would still allow the goals and intent of the project to be met. Other 
unrelated actions would not be covered in the consultation.
    Issue 3: Several commenters questioned the statement that critical 
habitat designation would not affect activities on State, local, or 
private lands unless there is a Federal permit, license, or funding 
involved, citing potential impacts of the designation through State 
laws.
    Service Response: During the public comment period, the Service 
sought and received additional information on the potential impact of 
critical habitat designation resulting from State laws and regulations. 
The potential impacts vary by state. See the Role in Species 
Conservation section for a detailed discussion of the effects by state.
    Issue 4: Several commenters recommended that the Service postpone 
issuing a final rule until additional studies are conducted and better 
information on the species' biology and threats is available. Other 
commenters suggested that the Service should seek new information 
before adopting a final rule.
    Service Response: The Service is required to use the best available 
information in designating critical habitat. The Service is under court 
order to complete the designation of murrelet critical habitat by May 
15, 1996. The Service did solicit new biological data and public 
participation during the comment period and public hearings on the 
revised proposed rule. The Service will continue to monitor and collect 
new information and may revise the critical habitat designation in the 
future if new information supports a change.
    Issue 5: Several commenters raised issues already addressed in the 
supplemental proposed rule for the designation of critical habitat for 
the marbled murrelet (60 FR 40892). These include issues related to the 
listing of the species, the potential for critical habitat to result in 
the ``take'' of private lands, access across critical habitat, the need 
for an Environmental Impact Statement, and questions on the 
prehistorical condition of habitat in the Oregon Coast Ranges.
    Service Response: The Service incorporates by reference its 
responses to these issues contained in the supplemental proposed rule 
(60 FR 40892). No new information was provided that would result in any 
significant changes to the responses in the supplemental proposed rule.
    Issue 6: One commenter maintained that the Service failed to 
distinguish recovery objectives from the designation of critical 
habitat.
    Service Response: In the revised proposed rule, the Service 
provided information on the link between recovery and critical habitat. 
The areas designated as murrelet critical habitat conform to the Act's 
requirements for critical habitat designations. Critical habitat 
includes the areas ``essential to the conservation of the species'' (16 
USC 1532(5)(A)). Conservation is defined in the Act as actions 
necessary to promote recovery of the species (16 USC 1532(3)). 
Therefore, critical habitat is linked to recovery.
    The commenter also confused the issuance of a ``no jeopardy'' 
biological opinion on the Northwest Forest Plan with conservation of 
the murrelet throughout three-state range. The biological opinion on 
the Northwest Forest Plan addressed only the impacts on Federal lands. 
Conservation of the murrelet has to be analyzed more broadly.
    Issue 7: One commenter maintained that the Service failed to 
provide reasoned explanation for changes between the first and second 
proposals.
    Service Response: The Service addressed the basis and rationale for 
the differences in the supplemental proposed rule (60 FR 40892). In the 
first proposal, the Service had indicated that some revisions might be 
necessary and had requested information to assist the Service in making 
changes.
    Issue 8: One commenter suggested that the Service provide a method 
to correct legal descriptions without going through the formal rule-
making process. Other commenters suggested that the Service specify 
that lands traded from public to private ownership be excluded from 
critical habitat once the trade is complete. Several commenters 
believed that failure to exclude traded areas would effectively halt 
the land exchanges.
    Service Response: A rule designating critical habitat is required 
to contain a sufficient description of areas designated to allow 
persons to determine whether a particular segment of land is included 
or excluded. If corrections or clarifications become necessary, the 
Service will make them.
    Areas were chosen because of their value to the conservation of the 
marbled murrelet. The Service conducts section 7 consultation on any 
land exchange that may affect critical habitat. During the consultation 
process, the Service considers the conservation value of the

[[Page 26273]]

areas acquired, as well as the potential effects of the lands traded in 
determining whether the action as a whole would destroy or adversely 
modify critical habitat. Even in the event that a proposed exchange 
would result in the destruction or adverse modification of critical 
habitat, the Service will work with the action agency and any 
applicants to craft reasonable and prudent alternatives that would 
allow the action to proceed.
    Changes in ownership do not by themselves change an area's status 
as critical habitat. If a portion of land is moved from Federal to non-
Federal ownership, the effects of the designation may change. 
Regardless of the original ownership, activities on non-Federal lands 
are likely to be affected by the designation only when there is a 
Federal nexus or where State law is triggered by the Federal 
designation.
    Issue 9: One commenter charged that the Service did not use the 
best scientific information. The commenter interpreted the Act to allow 
and require the use of only data, not theories or interpretations of 
the data.
    Service Response: The Service believes it has used the best 
scientific information available, and will continue to review new 
information as it arises. The Service reviewed all information provided 
by commenters on the supplemental rule to determine if it supported 
alternative conclusions. Science involves not only the use of raw data, 
but the hypotheses, theories, and interpretations derived from those 
data. Failure to use such information would be contrary to good 
scientific practice and would not satisfy the Act's requirements. The 
commenter provided several specific examples, which have been addressed 
in the ``Ecological Considerations'' section as well as the Biological 
Issues in this section of the rule.
    Issue 10: One commenter contends that the Service erred by 
designating areas not ``occupied by murrelets at the time of listing.'' 
The commenter asserts that on September 28, 1992 (the time of listing), 
the species had completed nesting and were all on the ocean, therefore 
no nesting habitat could be considered occupied at the time of listing.
    Service Response: The commenter's interpretation of ``geographical 
areas occupied by the species at the time of listing'' is erroneous. 
The commenter appears to have confused the definition of ``occupied'' 
in the Pacific Seabird Protocol (designed to determine potential 
breeding by birds located in a specific area in a specific year) with 
the biological determination of species occupancy. Biologists consider 
all areas used by members of a species, regardless of life stage or 
season, as within the occupied range of the species.
    Issue 11: One commenter suggested that the legal descriptions of 
critical habitat in areas of intermingled Federal ownership should 
specifically exclude the non-Federal lands through description, rather 
than by definition.
    Service Response: In the supplemental proposed rule, the Service 
specified the ownerships included in the designation for each area 
described. Within Federal LSRs, only Federal lands are included by 
definition, thereby excluding any non-federal lands. In addition, only 
lands that contain the primary constituent elements are included by 
definition. This approach satisfies the requirements of the Act. The 
Service continues to work on improving the descriptions of critical 
habitat units. We appreciate the specific information provided by 
private landowners on their ownerships within the Federal and State 
lands designated. However, in this court-ordered final designation, the 
Service has included and excluded areas by definition.
    Issue 12: One commenter maintained that the Service had ignored the 
presence of marbled murrelet habitat in Congressionally-withdrawn 
areas, thereby increasing the area of non-Federal lands designated as 
critical habitat.
    Service Response: The Service is cognizant of the murrelet habitat 
in lower-elevation, Congressionally-withdrawn areas, including Redwood 
National Park. The Service assumes these areas will retain murrelet 
habitat based on the statutory requirements applicable to these areas 
and considered this in its designation of murrelet critical habitat.
    Issue 13: Several commenters suggested that the rationale for 
excluding Congressionally-withdrawn lands from designation as critical 
habitat should also apply to the Late-Successional Reserves under the 
Northwest Forest Plan because these areas were being managed to provide 
old-growth habitat.
    Service Response: Congressionally-withdrawn lands are designated by 
statute, which secures their status. Any change to their management 
requires an act of Congress. Those areas designated for management in a 
manner consistent with murrelet conservation are expected to remain so. 
Therefore, there is no added value to designating them as critical 
habitat. In contrast, plan-level designations, such as Late-
Successional Reserves, are reviewed and revised periodically (at least 
every 10-15 years), and therefore do not have the secure status of 
Congressionally-withdrawn areas. Critical habitat designation serves to 
remind future planners of the importance of these areas to the 
conservation of the marbled murrelet. Therefore, designation of these 
areas as critical habitat is valuable, even if current management is 
consistent with murrelet conservation.
    Issue 14: Several commenters suggested that the explanation for the 
exclusion of Tribal lands, Congressionally-withdrawn areas, and marine 
habitat could also be applied to all terrestrial critical habitat.
    Service Response: The Service discussed of the reasons for each of 
these exclusions in the final rule. A major consideration in the 
exclusion of Tribal lands were factors related to the Federal 
government's trust responsibilities and government to government 
relationships with Native American tribes. Congressionally-withdrawn 
lands have special and statutory designations that provide management 
protection for wildlife.
    In examining the information provided on marine habitat, the 
Service identified two key components of the marine habitat that are 
essential to the conservation of the murrelet, clean water and food. 
Marine habitat is not generally subject to incremental and continuing 
losses or removal as terrestrial habitat is. Threats in the marine 
environment are often related to catastrophic events that cause loss of 
individuals, not habitat. The primary identified threats to marine 
murrelet habitat are pollution and toxic spills. Fishing does not 
appear to be a threat to habitat at this time. Several laws regulate 
activities that could result in pollution or toxic spills in the marine 
environment that have no counterparts in the terrestrial environment, 
and are briefly described in the Previous Management Efforts section. 
Other marine concerns, such as the effect of El Nino and ocean 
currents, are outside human control and would not be affected by the 
designation of critical habitat. The Service will continue to monitor 
the degree to which these and other regulatory measures ameliorate 
identified threats and the need for special management consideration or 
protection.
    Issue 15: A number of commenters identified areas that they thought 
should not be designated as critical habitat.
    Service Response: If site-specific documentation on a site was 
provided to the Service providing a rationale as to why an area should 
not be designated

[[Page 26274]]

critical habitat, that information was evaluated and a determination 
made as to whether modifications in the proposal were appropriate. For 
example, habitat maps were provided by State and private landowners in 
southwest Washington that allowed the Service to modify critical 
habitat boundaries due to the absence of primary constituent elements. 
Federal agencies in Oregon provided habitat and survey information that 
allowed the Service to modify boundaries.
    Issue 16: Some commenters suggested that the Service was breaching 
the Memorandum of Understanding with the State of California signed in 
1991 because the Service is designating non-Federal lands in 
California.
    Service Response: The Service chose non-Federal lands on the basis 
of limited amounts of Federal lands in the vicinity that could support 
a well-distributed population of marbled murrelets and on the basis of 
the non-Federal land's contribution to recovery.
    Issue 17: One commenter raised the question of the need to 
designate private lands when they would never provide the large, 
contiguous blocks of nesting habitat most desirable for marbled 
murrelets.
    Service Response: The Service acknowledges that private lands in 
general do not have, nor will they probably have in the future, the 
large contiguous blocks of habitat most desirable for the conservation 
of the marbled murrelet. However, Federal lands, where large, 
contiguous blocks of habitat could be developed, are lacking in 
portions of the marbled murrelet's range. In these areas, critical 
habitat units have been designated because smaller blocks of suitable 
habitat on non-Federal lands are essential for maintaining the species' 
range-wide distribution and numbers.
    Issue 18: One commenter requested that we be more specific about 
which, if any, gillnet fisheries create problems for marbled murrelets. 
The commenter specifically stated that the Columbia River gillnet 
fishery was not a fishery causing problems for marbled murrelets.
    Service Response: The Service presently considers the Columbia 
River gillnet fishery a very minor threat to marbled murrelets relative 
to other fisheries, such as the Puget Sound commercial salmon fishery. 
This is in part because of the very limited effort which now occurs in 
this fishery. It is also because the Service recognizes that there are 
currently few marbled murrelets present in the vicinity of the mouth of 
the Columbia, although their historic presence in the area is well-
documented. However, while the observer program conducted from 1991-
1993 (Jeffries and Brown 1993) did not specifically describe any 
entanglement of marbled murrelets, significant numbers of unidentified 
alcids were entangled. Therefore, it cannot be stated conclusively that 
the Columbia River gillnet fishery does not pose a threat to marbled 
murrelets, particularly if fishing effort were to increase 
dramatically.
    Issue 19: One commenter stated that the economic analysis was 
flawed because it failed to analyze the economic effects for each area 
separately.
    Service Response: The economic analysis for this critical habitat 
designation is sufficient for consideration of the relevant impacts of 
specifying particular areas as critical habitat.
    Issue 20: Several commenters expressed the opinion that the Service 
should consider the economic effects of critical habitat without 
adjusting for the effects of the listing or the Northwest Forest Plan.
    Service Response: The economic analysis is conducted to allow 
informed consideration of the impacts of designating particular areas 
as critical habitat. Areas may be excluded from critical habitat if the 
benefits of excluding the area outweigh the benefits of including the 
area, so long as the exclusion does not lead to the extinction of the 
species. For this, the Service needs to determine the incremental 
increase in economic effects from the designation. In the absence of 
critical habitat, the listing of the species, other laws, and existing 
Federal land management plans remain in effect. Therefore, to determine 
the actual impact of a designation, the Service must determine the 
effect that will occur with the designation above and beyond the 
existing requirements. To attribute all economic effects of murrelet 
conservation to critical habitat alone would not provide an accurate 
assessment of the impacts of the designation.
    Issue 21: Several commenters maintained that the removal of 4.4 
million acres from the timber base would have severe economic impacts. 
Other commenters addressed individual areas in a similar manner, making 
the assumption that designation would stop all harvest.
    Service Response: Critical habitat does not stop or prevent all 
timber harvest or other activities on designated lands. In the absence 
of a Federal nexus (funding, permitting, authorization, or action by a 
Federal agency) or State regulations tiered to a designation, there is 
no effect. Even with a Federal nexus, projects are not affected unless 
they would appreciably diminish the value of critical habitat for both 
the survival and recovery of the species. Whether a particular activity 
will appreciably diminish the value of critical habitat will depend on 
several factors, including the scope, magnitude, and location of the 
activities, as well as the condition of the critical habitat unit and 
the Marbled Murrelet Conservation Zone described by the Recovery Team 
(USFWS 1995a). If the critical habitat areas in a zone are generally in 
good condition, the potential for individual projects to diminish its 
value is lower than where critical habitat in a zone is in poor 
condition. Based on the application of previous designations, 
significant adverse impacts to individual critical habitat areas may 
not trigger the above threshold.
    In addition, timber harvest in accordance with an approved HCP that 
addresses marbled murrelets should also be unaffected by the present 
determination of critical habitat, given the Service's intention to 
defer to the special management considerations for the murrelet under 
the HCP and the Service's exclusion of lands covered by an HCP from 
critical habitat.
    Issue 22: Some commenters disagreed with the use of sites 
identified as occupied by marbled murrelets under the Pacific Seabird 
Group protocol as a criterion for critical habitat designation, because 
the commenters believe that some of the behaviors that resulted in 
occupied status were not indicative of nesting. One commenter suggested 
that ``the 1994 protocol dropped circling behavior from the definition 
of occupied behaviors.
    Service Response: The Service used all available information in the 
selection of areas for designation as critical habitat. Survey 
information was only one of the criteria considered in selecting areas 
for proposed critical habitat designation. Survey results (including 
occupied sites, marbled murrelet presence, and lack of detections) were 
used as indicators of the presence/absence of marbled murrelets in 
specific areas. However, survey efforts have been minimal in many 
areas, and coverage of areas is discontinuous. Such information was of 
limited use in designating critical habitat in portions of the range.
    The 1994 protocol did not remove circling behavior from the 
definition of occupied behaviors. In fact, both the 1993 (p. 11) (Ralph 
et al. 1993) and 1994 (p. 12) (Ralph et al. 1994) versions of the 
protocol include it under criteria indicating occupancy. This 
relationship

[[Page 26275]]

has been statistically analyzed and verified. Under ``occupied stands'' 
(p. 13 and again on pg. 21) in the 1994 protocol, Ralph et al. (1994) 
clearly state that birds circling above the canopy is a criterion 
indicating occupancy. This conclusion was affirmed in the March 8, 1995 
addendum to the 1995 protocol (Ralph et al. 1995c), as well as in a 
signed declaration prepared by Dr. C.J. Ralph on September 27, 1995 
(Ralph 1995).
    Issue 23: Some commenters suggested that the Service designate 
additional habitat to compensate for the loss of high quality occupied 
murrelet nesting habitat that may be harvested as a consequence of 
timber sales released by the so-called ``Salvage Rider'' (Public Law 
104-19, Section 2001).
    Service Response: The government's position is that section 
2001(k)(2) of P.L. 104-19 expressly forbids the harvest of identified 
nesting sites. The Federal District Court for the District of Oregon 
disagreed with the government's position and directed the government to 
release for harvest the majority of these sites. The Government has 
appealed this decision to the Ninth Circuit Court of Appeals, and as of 
this writing the harvest is temporarily stayed until the Ninth Circuit 
rules on the case. Therefore, the Service believes any compensatory 
designation of additional critical habitat is unwarranted at this time.
    Issue 24: Several commenters expressed concern that critical 
habitat is a disincentive to landowners contemplating developing 
habitat conservation plans (HCPs) within designated areas.
    Service Response: The Service does not intend to discourage HCPs 
with the designation of critical habitat. We expect that critical 
habitat may be used as a tool to help identify areas within the range 
of the murrelet more critical for the conservation of the species. The 
Service considers HCPs to be one of the most important methods by which 
non-Federal landowners can resolve endangered species conflicts.
    All HCPs are reviewed to determine whether they are likely to 
jeopardize the continued existence of the species or cause adverse 
modification to designated critical habitat. In most cases, the Service 
provides technical assistance and works closely with the applicant 
throughout the development of the HCP to reduce the probability of the 
applicant developing an HCP that would not meet these criteria. Well 
developed HCPs should be able to meet the section 7 requirement to 
avoid adverse modification of critical habitat by providing sufficient 
special management considerations for the constituent elements 
identified for murrelet critical habitat. The Service does not 
anticipate that the designation of critical habitat for the marbled 
murrelet will affect ongoing negotiations for HCPs with landowners like 
the State of Washington or various large timber companies.
    Issue 25: Several commenters disagreed with removing areas covered 
under an HCP from designation. Whereas in contrast, another commenter 
felt that planning approaches such as the development of multi-species 
HCPs were preferable to critical habitat designation.
    Service Response: The Service recognizes that critical habitat is 
only one of many conservation measures for federally-listed species. 
HCPs are perhaps one of the most important tools for reconciling land 
use with the conservation of listed species on non-Federal lands. Since 
HCPs can provide an alternative means of addressing the special 
management considerations necessary for the constituent elements of 
marbled murrelet critical habitat, those areas covered by a legally-
operative incidental take permit for marbled murrelets based on an 
approved HCP are excluded from critical habitat.
    Consistent with this approach, the Service has not designated the 
Elliott State Forest in Oregon as critical habitat based on the State 
completing an HCP for that forest. Other areas without completed HCPs 
have been included in this designation. When those HCPs are completed 
and incidental take permits for marbled murrelets issued, critical 
habitat will be lifted.
    Issue 26: Numerous commenters recommended that the Service 
designate marine critical habitat. Several commenters recommended 
addition of the following terrestrial areas as critical habitat:
    In California, commenters recommended inclusion of private lands in 
Del Norte, Humboldt, Mendocino, Sonoma, San Mateo, and Santa Cruz 
Counties. One private property owner requested designation of her 60 
acres in the Santa Cruz Mountains Zone. The Midpeninsula Regional Open 
Space District requested that the District's Purisima Creek Redwoods 
Open Space Preserve be designated in San Mateo County. Commenters also 
suggested inclusion of county parks along the Van Duzen River. State 
lands recommended for inclusion included Van Damme State Park and 
Navarro River Redwood State Park in the Mendocino Zone, and Nisene 
Marks State Park and Soquel State Demonstration Forest in the Santa 
Cruz Mountains Zone. In Washington, commenters recommended the 
inclusion of Washington Department of Natural Resource lands in the 
Clallam Bay block and the Chehalis State Forest, Deception Pass State 
Park, additional lands adjacent to Jim Creek, private lands in the 
Mineral block, and private lands with occupied sites in the north 
Cascades.
    Service Response: Under the Administrative Procedures Act (5 U.S.C. 
553), the Service cannot finally designate areas as critical habitat 
unless they were proposed for designation in a proposed rule. Further, 
the Service is under a court order to finalize this critical habitat 
designation by May 15, 1996. These recommendations will be considered 
in any future revisions of critic
FR Doc. 96-12647 Endangered and Threatened Wildlife and Plants; Final Designation of Critical Habitat for the Marbled Murrelet
al habitat for the marbled murrelet.

Biology

    Issue 27: Commenters suggested that prey distribution and 
abundance, rather than inland forest conditions, may dictate murrelet 
distributions at sea.
    Service Response: As described in the Ecological Considerations 
section, the Service agrees that prey distribution and abundance is an 
important ecological factor for murrelets at sea. However, particularly 
during the nesting season, marbled murrelets are found in high numbers 
in close proximity to areas where inland forested conditions are 
considered suitable for nesting throughout large portions of coastal 
Washington, Oregon, and California (Carter and Erickson 1992; Ralph and 
Miller 1995; Ralph et al. 1995b; Strong 1995, Varoujean and Williams 
1995). Conversely, marine concentrations tend to be low where on-shore 
habitat is limited. Concentrations of other alcids during the nesting 
season in 1994 did not correspond closely to murrelet distribution 
patterns (Varoujean et al. 1994), which one would expect if prey 
distribution was the single or most important determinant of seabird 
distribution.
    The distribution of marbled murrelets in the marine environment 
changes after the nesting season. This suggests that proximity to their 
nesting habitat is important for marbled murrelets during the breeding 
season even though food may be more abundant elsewhere (Ralph et al. 
1995b). However, changes in prey distribution and abundance may 
sometimes occur coincidentally with the end of the nesting season. 
Marbled murrelets have been documented to use a variety of prey 
species, which suggests that they are capable of exhibiting flexibility 
regarding food resources available to them during the nesting season. 
Therefore, the Service believes

[[Page 26276]]

that the condition of inland nesting habitat is an important factor 
explaining distributions in the marine environment during the nesting 
season.
    Issue 28: Some commenters disagreed with Service statements that 
marbled murrelets are found in high numbers at sea in close proximity 
to areas where inland forested conditions are considered suitable for 
nesting throughout large portions of coastal Washington, Oregon, and 
California. They contend that the 1994 and 1995 at-sea survey data did 
not support this assertion.
    Service Response: As described in the Ecological Considerations 
section, the Service believes murrelet concentrations at sea are likely 
to be determined by a combination of terrestrial and marine conditions. 
However, we believe that recent at-sea survey data support our earlier 
conclusions that marine observations during the nesting season 
generally correspond to the largest remaining blocks of suitable forest 
nesting habitat (Nelson et al. 1992; Varoujean et al. 1994; Ralph and 
Miller 1995; Ralph et al. 1995b; Strong 1995).
    Issue 29: One commenter stated that the proposed designation was 
premised on the incorrect assumption that the most important problem 
for marbled murrelet conservation was the availability of terrestrial 
nesting habitat. They stated that Beissinger's model, along with an 
additional modeling effort and other life-history information, shows 
that the marine environment is much more important than the terrestrial 
environment and, therefore, the Service should concentrate critical 
habitat designation on marine habitat features.
    Service Response: The Service agrees that the marine environment is 
very important to the murrelet, as discussed both in the supplemental 
critical habitat proposal (60 FR 40892) and the draft Recovery Plan 
(USFWS 1995a). However, there are a number of reasons why critical 
habitat is only being designated in the terrestrial environment. 
Currently, factors affecting the marine environment and murrelets while 
at-sea can be addressed through existing laws and regulations as 
discussed in this final rule (see Areas Not Designated section). In 
addition, numerous sources have stated the importance of nesting 
habitat as a major limiting factor in murrelet recovery. Although adult 
mortality does occur at-sea, it also has been documented in the 
terrestrial environment. Therefore, the designation of critical habitat 
in the terrestrial environment is appropriate at this time.
    Issue 30: Several commenters raised issues related to nest 
predation and predator numbers. These were primarily related to the 
effects of timber harvest and forest edge on predator numbers and 
marbled murrelet nest predation rates and the appropriateness of 
applying nest predation studies from other regions of the country to 
the Pacific Northwest. One commenter raised the potential use of 
predator control as a management tool. Several commenters suggested 
that predator numbers correlated with human use and therefore private 
lands may have fewer predators than public lands.
    Service Response: The Service has amended the final rule to reflect 
the comments and to provide additional documentation on statements 
related to predation. However, as discussed in the Ecological 
Considerations section, the Service believes that existing data 
strongly suggest that nest predation may be significantly higher for 
some forest birds nesting near artificially created edges, even if the 
exact causal mechanisms that affect the predation rates are unclear. 
The Service agrees with Paton (1994) and the commenters that research 
addressing this issue in Pacific Northwest forests is needed, and the 
Service is currently supporting such efforts (e.g., Marzluff et al. 
1996). However, the few completed studies addressing this issue in the 
Northwest or in commercial timberland areas elsewhere indicate the 
timber harvest in a forest can increase nest predation rates on forest 
birds under certain circumstances (Ratti and Reese 1988; Rudnicky and 
Hunter 1993; Vega 1993; Bryant 1994; Vander Haegen and DeGraaf, in 
press). In fact, Ratti and Reese (1988) found that abrupt forest edges 
created by commercial timber harvest could lead to increased nest 
predation rates, and they concluded that their data are consistent with 
the hypothesis that birds are poorly adapted to predator pressure near 
abrupt artificial edge zones.
    Some commenters failed to distinguish between the studies that 
address ground nesting birds (e.g., Small and Hunter 1988), and those 
cited by the Service that concern species that nest above the ground 
like the marbled murrelet. Small and Hunter (1988) investigated 
predation rates on ground nests and concluded that distance from edge 
was not related to nest predation (although they did conclude that 
nests in smaller forest fragments were more vulnerable than nests 
located in larger forest stands). They felt their results were due to 
the relatively high numbers of ground predators (i.e., fox, raccoon, 
and skunk) compared to low numbers of bird predators (corvids). These 
findings are consistent with the more recent work of Vander Haegen and 
DeGraaf (in press) and Rudnicky and Hunter (1993). Both of these 
studies found no edge effect for ground nests but a two- to three-fold 
increase in predation for above-ground nests near edges when compared 
to above-ground nests in the forest interior. Although not completely 
representative of the high canopy nesting situation of murrelets, these 
results are significant because they more closely approximate the 
potential impacts of the avian predators believed to be affecting 
murrelets.
    Predator control as a management tool to recover species has been 
used effectively only in very limited situations. It may serve as a 
short-term solution to address an immediate threat while long-term 
solutions are being formulated. The high cost, logistical difficulties 
and high probability that the predator control will be unsuccessful 
(Goodrich and Buskirk 1996), however, argue against the use of predator 
control for a wide-ranging species such as the marbled murrelet.
    Regarding the issue that levels of human activity on public lands 
may result in predation rates which are higher than on private lands, 
the Service agrees that public lands that are easily accessible have 
higher levels of human use, with resultant activities that are 
attractive to corvids. However, corvids have also been shown to travel 
significant distances to urban centers, dumps, etc. which are often as 
close or closer to private lands than to public lands (Marzluff et al. 
1996). The other factor which appears to increase predation rates is 
higher levels of landscape fragmentation (Marzluff et al. 1996), which 
is generally greater on private lands. Therefore, it is difficult to 
generalize about the relationship between land ownership and predation 
rates.
    Issue 31: One commenter suggested that the Service ignored the 
findings of Raphael et al. (1995) that occupied murrelet sites had more 
complex patterns with more edge, greater variety of cover types, and 
more complex shapes than unoccupied sites. The commenter indicated that 
these conclusions seem to contradict statements made by the Service 
concerning forest edge and landscape patterns.
    Service Response: The Service disagrees with this commenter's 
interpretation of Raphael et al. (1995). The most important and 
relevant conclusions of Raphael et al. (1995) (M. Raphael, pers. 
comm.), are: (1) proportions of old-growth and large saw

[[Page 26277]]

timber were greater among sites occupied by murrelets compared to 
unoccupied sites, and (2) mean size of patches of old-growth and large 
saw timber were also greater among occupied sites compared to 
unoccupied sites. As Raphael et al. (1995) state, these findings are 
consistent with earlier research documenting the value of large old-
growth stands to nesting murrelets.
    These findings support, rather than contradict, the hypothesis that 
murrelets are preferentially selecting larger stands of older trees for 
breeding because these stands and trees have the specific structural 
features the birds require. That the murrelets occur more often in 
larger patches (i.e., less edge relative to area) of old-growth 
compared to smaller patches is also consistent with the edge-effect 
concerns expressed in this rule. The Service believes that resident 
marbled murrelets may be made more vulnerable to predation associated 
with the newly created edges when existing old-growth stands are 
further fragmented into smaller patches.
    Issue 32: One commenter suggested that the Service conduct a 
population viability analysis (PVA) of the marbled murrelet before 
designating critical habitat.
    Service Response: This final rule is directly related to management 
directives that preceded or were developed simultaneously with the 
critical habitat rule. Of greatest significance were the draft Recovery 
Plan (USFWS 1995a) and the marbled murrelet viability panels of the 
FEMAT process (USDA et al. 1993a). It is the Service's opinion that 
these efforts incorporate many of the concepts which should be 
considered when a formal PVA is not conducted (Ruggiero et al. 1994), 
and provide the best guidance for management. The function of a PVA is 
to incorporate what is known about population dynamics of a species, 
and to analyze the effects of stochastic events and changes in 
parameters, as well as to identify factors for study, management and 
monitoring (Lacey in Press). However, PVA's can be compromised because 
of a lack of natural history data (Minta and Kareiva 1994). Therefore, 
the Service believes that a PVA developed based on current knowledge of 
the marbled murrelet would be premature, and is not a suitable tool for 
determining critical habitat.
    Issue 33: Several commenters suggested that the Service has 
dismissed natural marine phenomena as unimportant in affecting marbled 
murrelet population fluctuations and distributions. One commenter used 
the extinction of the Labrador duck (Camptorhynchus labradorus) as an 
example of how marine fluctuations can cause natural extinctions of 
marine birds, and suggested that the current decline of the marbled 
murrelet is analogous to the extinction of the Labrador duck.
    Service Response: As stated in the Ecological Considerations 
section and elsewhere, the Service appreciates the role that natural 
marine fluctuations play in the demography of the marbled murrelet. The 
murrelet, like many other seabirds, is affected by stochastic factors 
such as gross water temperature changes and shifting patterns of prey 
abundance. Likewise, it is affected by terrestrial stochastic factors 
such as fire and windthrow. It is a generally accepted tenet of 
conservation biology that extinction for a declining species becomes 
more likely due to natural stochastic factors as a population becomes 
smaller and more fragmented. Maintenance of high quality nesting 
habitat in key areas will better enable the species to successfully 
endure marine and terrestrial stochastic events when they do occur. For 
example, Clark et al. (1990) found that limited availability of 
suitable nest sites hindered the population growth and recovery of red-
tailed tropicbirds (Phaethon rubricauda) following catastrophic ocean 
events.
    The Service disagrees with the commenter's assertion that the 
Labrador duck went extinct solely from natural causes, and that this 
so-called natural decline is analogous to natural forces acting to 
depress the marbled murrelet population. Although the Labrador duck was 
never very abundant, the best available information suggests that over-
exploitation by humans caused the extinction of the species; the bird 
was hunted for market and for down, and its eggs were collected 
(Ehrlich et al. 1988; Terres 1980; Bellrose 1976).
    Issue 34: Some commenters questioned the quality of the data that 
the Service used to determine critical habitat. One commenter 
questioned the Service's use of satellite imagery to identify critical 
habitat.
    Service Response: The Act requires the Service to make biological 
decisions involving designation of critical habitat based on the best 
scientific and commercial data available. The Service utilized a number 
of sources to identify critical habitat including aerial photographs 
and personal knowledge. The Service maintains that sufficient data are 
available to warrant designation of critical habitat and that this 
final rule is based on the best information available.
    Issue 35: Two commenters suggested exclusion of the proposed 
critical habitat units that contain Bishop pine.
    Service Response: Two critical habitat units in California contain 
mature Bishop pine forests, Tomales Bay State Park and Salt Point State 
Park. These areas currently do not have any known records of murrelet 
detections; however, the Service is unaware of any surveys which have 
been conducted to determine if Bishop pine forests are used by marbled 
murrelets. The Service has determined that it is appropriate to 
designate these Bishop pine areas as critical habitat because of the 
lack of survey data, proximity of these areas to the ocean, 
availability of suitable nesting platforms, and high canopy cover. In 
the future, if surveys determine that murrelets are not nesting in 
these stands the boundaries of these critical habitat units may be 
revised.

National Environmental Policy Act

    The Service has determined that Environmental Assessments and 
Environmental Impact Statements, as defined under the authority of the 
National Environmental Policy Act of 1969, need not be prepared in 
conjunction with regulations adopted pursuant to section 4(a) of the 
Endangered Species Act of 1973, as amended. A notice outlining the 
Service's reasons for this determination was published in the Federal 
Register on October 25, 1983 (48 FR 49244).

Required Determinations

    The final rule has been reviewed by the Office of Management and 
Budget under Executive Order 12866. The Department of the Interior 
finds that timely compliance with the provisions of the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.) is impracticable in light of the 
emergency situation resulting from the court order requiring 
designation by May 15, 1996. Consequently, the completion of a 
Regulatory Flexibility Analysis is deferred at this time and will be 
completed within 180 days. Based on the information discussed in this 
final rule concerning public projects and private activities within 
critical habitat units, it is not clear whether significant economic 
impacts would result from the critical habitat designation. Also, no 
direct costs, enforcement costs, information collection, or record-
keeping requirements would be imposed on small entities by this 
designation. Further, the rule contains no record-keeping requirements 
as defined by the Paperwork Reduction Act of 1980.

[[Page 26278]]

    Finally, the Department has assessed the effects of this rule-
making action on State, local, and tribal governments, and the private 
sector. The Service has determined and certifies pursuant to the 
Unfunded Mandates Act, 16 U.S.C. 1502 et seq., that this rulemaking 
will not impose a cost of $100 million or more in any given year on 
local or State governments or private entities.

References Cited

    A compete list of all references cited herein is available upon 
request from the State Supervisor, U.S. Fish and Wildlife Service, 
Oregon State Office, 2600 SE 98th Avenue, Suite 100, Portland, Oregon, 
97266; telephone (503) 231-6179.

List of Subjects in 50 CFR Part 17

    Endangered and threatened species, Exports, Imports, Reporting and 
record keeping requirements, Transportation.

Regulation Promulgation

    Accordingly, the Service hereby amends part 17, subchapter B of 
chapter I, title 50 of the Code of Federal Regulations, as set forth 
below:

PART 17--[AMENDED]

    1. The authority citation for part 17 continues to read as follows:

    Authority: 16 U.S.C. 1361-1407; 16 U.S.C. 1531-1544; 16 U.S.C. 
4201-4245; Pub. L. 99-625, 100 Stat. 3500; unless otherwise noted.

Sec. 17.11   [Amended]

    2. Section 17.11(h) is amended by revising the ``Critical habitat'' 
entry for ``Murrelet, marbled'' under BIRDS to read: 17.95(b).
    3. Section 17.95(b) is amended by adding critical habitat for the 
marbled murrelet, in alphabetical order, as follows.

Sec. 17.95   Critical habitat--fish and wildlife

* * * * *
    (b) Birds
* * * * *
MARBLED MURRELET (Brachyramphus marmoratus marmoratus)
    1. Critical habitat units are depicted for the States of 
Washington, Oregon, and California on the maps below.
    2. The primary constituent elements: individual trees with 
potential nest platforms and forest lands of at least one half site-
potential tree height regardless of contiguity within 0.8 kilometers 
(0.5 miles) of individual trees with potential nesting platforms and 
that are used or potentially used by the marbled murrelet for nesting 
or roosting.
    3. A description of the critical habitat units follows. Where a 
critical habitat unit includes Federal lands within the boundaries of a 
Late Successional Reserve established by the Northwest Forest Plan, 
those boundaries include any minor adjustments. Critical habitat units 
do not include non-federal lands covered by a legally operative 
incidental take permit for marbled murrelets issued under section 10(a) 
of the Act.

BILLING CODE 4310-55-P

[[Page 26279]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.000

[[Page 26280]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.001

[[Page 26281]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.002

BILLING CODE 4310-55-P

[[Page 26282]]

    Map and description of WA-01-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Flattery, Forks, and Port Angeles, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.28N., R.10W. Willamette Meridian: W\1/2\ W\1/2\ Section 1; 
Sections 2-8; NW\1/4\, N\1/2\ SW\1/4\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/
4\ Section 9; N\1/2\ NW\1/4\, NE\1/4\ Section 10; W\1/2\ NW\1/4\, 
NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 11; NW\1/4\ NW\1/4\ Section 
12.
    T.28N., R.11W. Willamette Meridian: Sections 1-5; S\1/2\ SW\1/
4\, SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 6; Sections 7-
12; N\1/2\ NW\1/4\ Section 13; N\1/2\ Section 14; N\1/2\ N\1/2\ 
Section 15; N\1/2\ Section 16; N\1/2\, N\1/2\ SW\1/4\ Section 17; 
N\1/2\ N\1/2\ Section 18.
    T.28N., R.12W. Willamette Meridian: SW\1/4\ SW\1/4\ Section 1; 
SW \1/4\, S\1/2\ SE\1/4\ Section 2; S\1/2\ SW\1/4\, SE\1/4\ Section 
3; N\1/2\ N\1/2\ Section 10; N\1/2\ Section 11; Section 12 except 
SW\1/4\ SW\1/4\, N\1/2\ NE\1/4\ Section 13.
    T.29N., R.10W. Willamette Meridian: SW\1/4\ NW\1/4\, W\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\ Section 1; Section 2 except N\1/2\ NE\1/4\; 
Section 3 except N\1/2\ NE\1/4\; Sections 4-5; SE\1/4\ NW\1/4\, 
SW\1/4\ SW\1/4\, E\1/2\ Section 6; Sections 7-24; Section 25 except 
SE\1/4\ SE\1/4\; Sections 26-35; NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ 
SW\1/4\, W\1/2\ NE\1/4\ Section 36.
    T.29N., R.11W. Willamette Meridian: SE\1/4\ SW\1/4\, SE\1/4\, 
SE\1/4\ NE\1/4\ Section 12; Section 13; N\1/2\, N\1/2\ SW\1/4\, 
SE\1/4\ Section 14; E\1/2\ SE\1/4\ Section 22; S\1/2\, NE\1/4\ 
Section 23; Sections 24-27; S\1/2\, S\1/2\ NE\1/4\ Section 28; SE\1/
4\ Section 29; SE\1/4\ SE\1/4\ Section 31; S\1/2\ SW\1/4\, NE\1/4\ 
SW\1/4\, SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 32; 
Sections 33-36.
    T.30N., R.09W. Willamette Meridian: S\1/2\ SW\1/4\ Section 18; 
N\1/2\ NW\1/4\ Section 19.
    T.30N., R.10W. Willamette Meridian: E\1/2\ NW\1/4\, E\1/2\ SW\1/
4\, SW\1/4\ SW\1/4\, SE\1/4\, SW\1/4\ NE\1/4\ Section 1; S\1/2\ 
SW\1/4\, SW\1/4\ SE\1/4\ Section 2; Section 3 except NE\1/4\; 
Section 4; E\1/2\ NW\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, E\1/2\ 
Section 5; S\1/2\ Section 6; Sections 7-12; Section 13 except SW\1/
4\ SW\1/4\; NW\1/4\ NW\1/4\, NE\1/4\ Section 14; Section 15; N\1/2\, 
N\1/2\ SE\1/4\ Section 16; N\1/2\ Section 17; Section 18 except S\1/
2\ SE\1/4\; NW\1/4\ NW\1/4\ Section 19; SW\1/4\ SW\1/4\ Section 35.
    T.30N., R.11W. Willamette Meridian: Sections 1-2; Section 3 
except S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\; Section 4 except S\1/2\ 
SW\1/4\, SW\1/4\ SE\1/4\; NE\1/4\ NE\1/4\ Section 10; N\1/2\ NW\1/
4\, SE\1/4\ SE\1/4\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 11; 
NW\1/4\ NW\1/4\, S\1/2\, E\1/2\ NE\1/4\ Section 12; Sections 13-14; 
S\1/2\, S\1/2\ NE\1/4\ Section 15; S\1/2\ Section 17; SE\1/4\ 
Section 18; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ Section 20; 
N\1/2\, N\1/2\ SE\1/4\ Section 21; N\1/2\, N\1/2\ S\1/2\ Section 22; 
N\1/2\, N\1/2\ SW\1/4\ Section 23; NW\1/4\, W\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\ Section 24.
    T.30N., R.12W. Willamette Meridian: NW\1/4\ NW\1/4\ Section 2; 
W\1/2\, N\1/2\ NE\1/4\ Section 3; Section 4-5; Section 6 except W\1/
2\ NW\1/4\, NW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 7; Section 8 
except SW\1/4\ SW\1/4\; N\1/2\ N\1/2\, SE\1/4\ SE\1/4\ Section 9; 
S\1/2\ Section 10; S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 11; W\1/
2\ NW\1/4\ Section 13; N\1/2\, N\1/2\ SW\1/4\ Section 14; N\1/2\, 
NE\1/4\ SE\1/4\ Section 15; Section 17 except NW\1/4\ NW\1/4\, SE\1/
4\ SE\1/4\.
    T.31N., R.12W. Willamette Meridian: Section 30 except NE\1/4\; 
Section 31; Section 32 except NE\1/4\; S\1/2\ SW\1/4\ Section 33.

    Critical Habitat includes only State or County lands described 
within the following areas:

    T.30N., R.12W. Willamette Meridian: N\1/2\ Section 16.

    [GRAPHIC] [TIFF OMITTED] TR24MY96.003
    
    Map and description of WA-01-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Port Angeles, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.29N., R.07W. Willamette Meridian: N\1/2\ NW\1/4\ Section 1; 
NE\1/4\ Section 2.
    T.30N., R.07W. Willamette Meridian: NW\1/4\ SW\1/4\, SW\1/4\ 
SE\1/4\, SW\1/4\ NE\1/4\ Section 26; S\1/2\ SW\1/4\ Section 29; 
Section 30 except SE\1/4\ NE\1/4\, N\1/2\ NE\1/4\; Section 31 except 
SW\1/4\ SW\1/4\; W\1/2\ W\1/2\, NE\1/4\ NW\1/4\ Section 32; W\1/2\ 
NW\1/4\, N\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, N\1/2\ SE\1/4\, S\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\ Section 33; NW\1/4\, N\1/2\ SE\1/4\, W\1/2\ 
NE\1/4\, SE\1/4\ NE\1/4\ Section 34; Sections 35-36.
    T.30N., R.08W. Willamette Meridian: Section 25; Section 26 
except NW\1/4\ NE\1/4\; Sections 27-29; N\1/2\ N\1/2\ Section 32; 
N\1/2\, NE\1/4\ SE\1/4\ Section 33; N\1/2\, N\1/2\ SW\1/4\, SE\1/4\ 
Section 34; N\1/2\, W\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, N\1/2\ SE\1/4\ 
Section 35; N\1/2\, N\1/2\ S\1/2\ Section 36.

    Critical Habitat includes only State or County lands described 
within the following areas:
    T.30N., R.06W. Willamette Meridian: N\1/2\ SW\1/4\, NW\1/4\ 
SE\1/4\ Section 18; NW\1/4\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 
19; SW\1/4\ SW\1/4\ Section 20; SW\1/4\ SW\1/4\, E\1/2\ SW\1/4\ 
Section 21; SE\1/4\ SE\1/4\ Section 23; NW\1/4\ NW\1/4\, W\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\ Section 25; E\1/2\ Section 26; SE\1/4\ 
NW\1/4\, S\1/2\ Section 27; Section 28 except SE\1/4\ SW\1/4\, NE\1/
4\ NE\1/4\; Section 29; Section 30 except S\1/2\ SW\1/4\; Sections 
31-34; W\1/2\ W\1/2\, E\1/2\ E\1/2\ Section 35; Section 36.
    T.30N., R.07W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 9; 
S\1/2\ SW\1/4\ Section 10; S\1/2\ S\1/2\, NE\1/4\ SE\1/4\ Section 
13; SE\1/4\ SW\1/4\, SE\1/4\, SE\1/4\ NE\1/4\ Section 14; SW\1/4\ 
NW\1/4\, NE\1/4\ NW\1/4\, NW\1/4\ SW\1/4\, SE\1/4\ SE\1/4\ Section 
15; SW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, S\1/2\ NE\1/4\ Section 
16; S\1/2\, S\1/2\ N\1/2\, NW\1/4\ NE\1/4\ Section 17; NW\1/4\ NW\1/
4\, S\1/2\, E\1/2\ NE\1/4\ Section 18; W\1/2\ NW\1/4\, SE\1/4\ NW\1/
4\, SW\1/4\, N\1/2\ SE\1/4\ Section 19; SW\1/4\, SW\1/4\ SE\1/4\, 
E\1/2\ NE\1/4\ Section 20; NW\1/4\, SW\1/4\ SW\1/4\, NW\1/4\ NE\1/4\ 
Section 21; SE\1/4\ SW\1/4\, E\1/2\ E\1/2\ Section 22; S\1/2\ NW\1/
4\, NE\1/4\ NW\1/4\, SE\1/4\, SE\1/4\ SE\1/4\, W\1/2\ NE\1/4\, NE\1/
4\ NE\1/4\ Section 23; N\1/2\, NW\1/4\ SW\1/4\, N\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\ Section 24; S\1/2\ NW\1/4\, NE\1/4\ Section 25; N\1/
2\, NW\1/4\ SE\1/4\ Section 27.
    T.30N., R.08W. Willamette Meridian: S\1/2\ SW\1/4\ Section 4; 
Section 5 except E\1/2\ NE\1/4\; Section 6 except NW\1/4\ NW\1/4\; 
Section 7 except S\1/2\ SW\1/4\; Section 8; Section 9 except NW\1/4\ 
NE\1/4\; SW\1/4\ SW\1/4\, SE\1/4\ Section 10; W\1/2\ SW\1/4\, SE\1/
4\ SW\1/4\, SE\1/4\, SE\1/4\ NE\1/4\ Section 11; SW\1/4\ NW\1/4\, 
N\1/2\ S\1/2\, SE\1/4\ SE\1/4\, S\1/2\ NE\1/4\ Section 12; NW\1/4\ 
NW\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, SE\1/4\ SE\1/4\, NE\1/4\ 
NE\1/4\ Section 13; Section 14; Section 15 except N\1/2\ SE\1/4\, 
S\1/2\ NE\1/4\; Section 16 except SW\1/4\ SE\1/4\; E\1/2\ NW\1/4\, 
NW\1/4\ NW\1/4\, NE\1/4\ Section 17; NE\1/4\ NW\1/4\, N\1/2\ NE\1/
4\, SW\1/4\ NE\1/4\ Section 20; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, 
SW\1/4\ SE\1/4\, E\1/2\ SW\1/4\, NE\1/4\ Section 22; W\1/2\, N\1/2\ 
SE\1/4\, SW\1/4\ NE\1/4\ Section 23; SW\1/4\ NW\1/4\, NE\1/4\ NW\1/
4\, N\1/2\ S\1/2\, N\1/2\ NE\1/4\ Section 24.
    T.31N., R.08W. Willamette Meridian: E\1/2\ SE\1/4\ Section 31; 
W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\ Section 32.
[GRAPHIC] [TIFF OMITTED] TR24MY96.004

    Map and description of WA-02-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Flattery and Forks, Washington; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.28N., R.12W Willamette Meridian: S\1/2\, S\1/2\ N\1/2\ Section 
4; S\1/2\, S\1/2\ N\1/2\ Section 5; S\1/2\, NW\1/4\, S\1/2\ NE\1/4\, 
Section 6; Sections 7-9; Sections 16-21; Sections 28-33.
    T.29N., R.12W. Willamette Meridian: S\1/2\ Section 7; SW\1/4\, 
SW\1/4\ SE\1/4\ Section 8; S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 
9; NW\1/4\, W\1/2\ SW\1/4\, W\1/2\ NE\1/4\ Section 16; Section 17 
except SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\; Section 18; Section 19 
except W\1/2\ SE\1/4\; W\1/2\ W\1/2\ Section 20; W\1/2\ Section 30.
    T.29N., R.13W. Willamette Meridian: S\1/2\ S\1/2\, NE\1/4\ NE\1/
4\ Section 13; Section 23 except SW\1/4\ SW\1/4\; Sections 24-25; 
N\1/2\, N\1/2\ S\1/2\, SE\1/4\ SE\1/4\ Section 26, N\1/2\ N\1/2\ 
Section 36.

[[Page 26283]]

    Critical Habitat includes only State or County lands described 
within the following areas:
    T.27N., R.13W. Willamette Meridian: W\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, SW\1/4\ Section 2; Sections 3-11; Sections 14-18; N\1/2\, 
NE\1/4\ SW\1/4\, NW\1/4\ SE\1/4\ Section 19; Sections 20-23; 
Sections 26-28; N\1/2\, W\1/2\ SW\1/4\, E\1/2\ SE\1/4\ Section 29.
    T.28N., R.13W. Willamette Meridian: Sections 22-25; W\1/2\ NW\1/
4\, S\1/2\, E\1/2\ NE\1/4\ Section 26; N\1/2\, N\1/2\ SE\1/4\ 
Section 27; SW\1/4\ SW\1/4\ Section 28; Sections 31-32; W\1/2\ W\1/
2\ Section 33; E\1/2\ E\1/2\, W\1/2\ SE1/4 Section 35; Section 36.
    T.28N., R.14W. Willamette Meridian: E\1/2\ Section 36.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.005
    
    Map and description of WA-02-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Forks and Mt Olympus, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.25N., R.10W. Willamette Meridian: Sections 29-30; Section 31 
except SE\1/4\ SE\1/4\; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 32.

    Critical Habitat includes only State or County lands described 
within the following areas:

    T.24N., R.11W. Willamette Meridian: N\1/2\ N\1/2\ Section 1; 
N\1/2\, N\1/2\ SW\1/4\ Section 2; Sections 3-8; Section 9 except 
SE\1/4\; N\1/2\ NW\1/4\ Section 10; NW\1/4\ Section 16; NW\1/4\, 
NW\1/4\ SW\1/4\, W\1/2\ NE\1/4\ Section 17; Section 18 except SE\1/
4\ SE\1/4\; NW\1/4\ NW\1/4\ Section 19.
    T.24N., R.12W. Willamette Meridian: NW\1/4\ NW\1/4\, S\1/2\ 
NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, SW\1/4\ NE\1/4\ 
Section 1; SE\1/4\, NW\1/4\ NE\1/4\, E\1/2\ NE\1/4\ Section 2; W\1/
2\ SE\1/4\, NE\1/4\ SE\1/4\, S\1/2\ NE\1/4\ Section 10; Section 11; 
Section 12 except NE\1/4\ SE\1/4\; W\1/2\, W\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\ Section 13; N\1/2\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 
14; NE\1/4\ NW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 23; N\1/2\, 
N\1/2\ SW\1/4\ Section 24.
    T.25N., R.09W. Willamette Meridian: NW\1/4\, W\1/2\ SW\1/4\, 
N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 6.
    T.25N., R.10W. Willamette Meridian: Sections 1-11; W\1/2\ NW\1/
4\, NE\1/4\ NW\1/4\ Section 12; NW\1/4\, N\1/2\ SW\1/4\, N\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\ Section 14; Section 15 except SE\1/4\ SW\1/
4\, S\1/2\ SE\1/4\; Sections 16-20; N\1/2\ Section 21.
    T.25N., R.11W. Willamette Meridian: Section 1-19; Section 20 
except NE\1/4\ NW\1/4\; Sections 21-36.
    T.25N., R.12W. Willamette Meridian: Section 1 except N\1/2\ N\1/
2\; Section 2 except NE\1/4\ NE\1/4\; Section 3 except NE\1/4\ NW\1/
4\; E\1/2\ Section 4; SE\1/4\ Section 5; SE\1/4\ SW\1/4\ Section 6; 
Section 7; N\1/2\ Section 8; Section 9; Section 10 except NE\1/4\ 
NE\1/4\; SE\1/4\ NW\1/4\, S\1/2\ Section 11; Section 12; Section 13 
except S\1/2\ SW\1/4\; W\1/2\ W\1/2\, E\1/2\ Section 14; Sections 
15-16; W\1/2\ W\1/2\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/
4\ Section 17; Section 18; E\1/2\ NW\1/4\, N\1/2\ NE\1/4\, SW\1/4\ 
NE\1/4\ Section 19; N\1/2\ N\1/2\ Section 20; N\1/2\ N\1/2\ Section 
21; N\1/2\ N\1/2\ Section 22; NW\1/4\ NW\1/4\, NE\1/4\ NE\1/4\ 
Section 23; NE\1/4\ NW\1/4\, E\1/2\ SW\1/4\, NE\1/4\ Section 24; 
Section 25; Section 26 except W\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, NW\1/
4\ NE\1/4\; Sections 35-36.
    T.25N., R.13W. Willamette Meridian: Section 1 except NE\1/4\ 
SE\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\; Section 2 except NW\1/4\; 
NE\1/4\ NW\1/4\, S\1/2\ S\1/2\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ 
Section 11; Section 12; Section 13 except SW\1/4\ SW\1/4\; Section 
14; N\1/2\ NW\1/4\ Section 23; NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\ 
Section 24.
    T.26N., R.09W. Willamette Meridian: S\1/2\ NW\1/4\, SW\1/4\, 
W\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, SW\1/4\ NE\1/4\ Section 19; W\1/2\ 
Section 29; Sections 30-31; W\1/2\ W\1/2\ Section 32.
    T.26N., R.10W. Willamette Meridian: Sections 2-11; W\1/2\ SW\1/
4\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\ Section 13; Sections 14-36.
    T.26N., R.11W. Willamette Meridian: Sections 1-36.
    T.26N., R.12W. Willamette Meridian: Section 36.
    T. 27N., R. 10W. Willamette Meridian:
S\1/2\ Section 31; S\1/2\ Section 32; S\1/2\ Section 33; S\1/2\ 
Section 34; S\1/2\ Section 35.
    T. 27N., R. 11W. Willamette Meridian: SE\1/4\ Section 35; S\1/2\ 
Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.006

    Map and description of WA-02-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Forks and Mt Olympus, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T. 23N., R. 9W. Willamette Meridian: NW\1/4\, NW\1/4\ SW\1/4\, 
NW\1/4\ NE\1/4\ Section 6.
    T. 23N., R. 10W. Willamette Meridian: N\1/2\, N\1/2\ SW\1/4\, 
SW\1/4\ SW\1/4\, N\1/2\ SE\1/4\ Section 1; N\1/2\ N\1/2\, SE\1/4\ 
NE\1/4\ Section 2; NW\1/4\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 
3; E\1/2\ NW\1/4\, NE\1/4\ Section 4; N\1/2\, SW\1/4\ SW\1/4\, NE\1/
4\ SW\1/4\, SE\1/4\ SE\1/4\, NE\1/4\ SE\1/4\ Section 15; S\1/2\ 
NW\1/4\, NE\1/4\ SW\1/4\, SE\1/4\, NW\1/4\ NE\1/4\, S\1/2\ NE\1/4\ 
Section 16; NE\1/4\ NE\1/4\ Section 22.
    T. 23N., R. 11W. Willamette Meridian: E\1/2\ NW\1/4\, N\1/2\ 
SE\1/4\, NE\1/4\ Section 1.
    T. 24N., R. 09W. Willamette Meridian: S\1/2\ N\1/2\, S\1/2\ 
Section 3; Sections 4-10; Section 15 except SE\1/4\ SE\1/4\, NE\1/4\ 
NE\1/4\; Sections 16-21; Sections 28-33.
    T. 24N., R. 10W. Willamette Meridian: Sections 1-3; S\1/2\, 
NE\1/4\ Section 4; S\1/2\ Section 5; S\1/2\ Section 6; Sections 7-
30; N\1/2\, N\1/2\ S\1/2\, SE\1/4\ SE\1/4\ Section 31; Sections 32-
36.
    T. 24N., R. 10\1/2\W. Willamette Meridian: S\1/2\ SE\1/4\ 
Section 1; Section 12 except W\1/2\ W\1/2\; Section 13; Section 14 
except NW\1/4\ NW\1/4\; Sections 23-26; NW\1/4\, N\1/2\ SW\1/4\, 
N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 35; N\1/2\ NW\1/4\, NE\1/4\ 
Section 36.
    T. 25N., R. 09W. Willamette Meridian: S\1/2\, SE\1/4\ NW\1/4\, 
S\1/2\ NE\1/4\ Section 31; NW\1/4\ SW\1/4\, S\1/2\ SW\1/4\ Section 
32.
    T. 25N., R. 10W. Willamette Meridian: S\1/2\ SE\1/4\ Section 36.

    Critical Habitat includes only State or County lands described 
within the following areas:

    T. 24N., R. 11W. Willamette Meridian: S\1/2\ SW\1/4\, NE\1/4\ 
SW\1/4\, SE\1/4\ Section 12; Sections 13-14; SE\1/4\ SE\1/4\ Section 
15; S\1/2\ S\1/2\ Section 20; S\1/2\ Section 21; E\1/2\ NE\1/4\, 
S\1/2\ Section 22; Sections 23-29; Sections 32-36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.007

    Map and description of WA-02-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Forks, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.27N., R.11W. Willamette Meridian: N\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\, SW\1/4\ SE\1/4\ Section 27; S\1/2\ NW\1/4\, N\1/2\ SW\1/4\, 
SW\1/4\ SW\1/4\, SE\1/4\ Section 28; NE\1/4\ SE\1/4\, SE\1/4\ NE\1/
4\ Section 29; SW\1/4\ NE\1/4\ Section 34.

[[Page 26284]]

    Critical Habitat includes only State or County lands described 
within the following areas:

    T.27N., R.10W. Willamette Meridian: Section 19.
    T.27N., R.11W. Willamette Meridian: S\1/2\ Section 14; S\1/2\ 
Section 15; S\1/2\ Section 16; S\1/2\ Section 17; Sections 18-24; 
S\1/2\ SW\1/4\ Section 27; N\1/2\ NW\1/4\, NE\1/4\ SW\1/4\, NW\1/4\ 
SE\1/4\ Section 28; N\1/2\ N\1/2\ Section 29; NE\1/4\ NE\1/4\ 
Section 30.
    T.27N., R.12W. Willamette Meridian: S\1/2\ Section 10; SW\1/4\ 
Section 11; Sections 13-15; Section 22; Section 23 except SE\1/4\ 
SE\1/4\; Section 24; NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 25; 
N\1/2\ NW\1/4\ Section 26; Section 27 except E\1/2\ SE\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.008

    Map and description of WA-03-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Mt Olympus and Shelton, Washington; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.21N., R.07W. Willamette Meridian: N\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, NE\1/4\ SW\1/4\, W\1/2\ SE\1/4\ Section 3.
    T.21N., R.08W. Willamette Meridian: Sections 4-9; N\1/2\, SW\1/
4\, NW\1/4\ SE\1/4\ Section 16; Sections 17-18; NW\1/4\ NW\1/4\ 
Section 21.
    T.21N., R.09W. Willamette Meridian: Section 1; Section 2 except 
NW\1/4\ NW\1/4\; Section 3 except SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\; Section 4; E\1/2\ Section 5; N\1/2\ Section 6.
    T.22N., R.07W. Willamette Meridian: Section 1; NE\1/4\ NW\1/4\, 
E\1/2\ SE\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ Section 2; W\1/2\ Section 
3; Sections 4-5; SE\1/4\ NW\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, 
E\1/2\ Section 6; NW\1/4\, N\1/2\ NE\1/4\ Section 7; SE\1/4\ NW\1/
4\, NE\1/4\ SW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, NW\1/4\ NE\1/
4\, E\1/2\ NE\1/4\ Section 8; Section 9; W\1/2\, W\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\ Section 10; NE\1/4\ SE\1/4\, NE\1/4\ Section 11; 
NW\1/4\ NW\1/4\, S\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 12; 
N\1/2\ NW\1/4\, S\1/2\ SW\1/4\, W\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, 
W\1/2\ NE\1/4\ Section 13; SW\1/4\ NW\1/4\, SW\1/4\, SW\1/4\ SE\1/4\ 
Section 14; Section 15 except SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\, 
SW\1/4\ NE\1/4\; Section 16; Section 17 except W\1/2\ NW\1/4\, NE\1/
4\ NW\1/4\; SW\1/4\, E\1/2\ SE\1/4\, NE1/4 NE1/4 Section 19; Section 
20 except SE1/4; Section 21 except SE\1/4\ SE\1/4\; N\1/2\ Section 
22; N\1/2\, E\1/2\ SW\1/4\, W\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 
23; W\1/2\ NW\1/4\, NE\1/4\ NW\1/4\ Section 24; NW\1/4\ Section 26; 
S\1/2\ NW\1/4\, SW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 27; N\1/2\ 
NW\1/4\ Section 28; NW\1/4\, N\1/2\ NE\1/4\ Section 29; SW\1/4\ 
SW\1/4\ Section 30; W\1/2\, N\1/2\ SE\1/4\, W\1/2\ NE\1/4\ Section 
31; W\1/2\ Section 34.
    T.22N., R.08W. Willamette Meridian: E\1/2\ SE\1/4\ Section 1; 
N\1/2\ NW\1/4\, W\1/2\ SW\1/4\, NW\1/4\ NE\1/4\ Section 2; Sections 
3-9; W\1/2\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 10; SE\1/4\ 
NW\1/4\, S\1/2\, S\1/2\ NE\1/4\ Section 11; W\1/2\ SW\1/4\, NE\1/4\ 
NE\1/4\ Section 12; NW\1/4\ NW\1/4\, SW\1/4\ SE\1/4\ Section 13; 
NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 14; Section 15 except E\1/2\ 
SE\1/4\, NE\1/4\; Sections 16-21; Section 22 except E\1/2\ SE\1/4\, 
NE\1/4\; E\1/2\ SE\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ Section 24; SE\1/
4\ SE\1/4\, NE\1/4\ NE\1/4\ Section 25; Section 27 except E\1/2\ 
E\1/2\; Sections 28-33; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\, SE\1/4\ 
SW\1/4\, E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\, W\1/2\ NE\1/4\ Section 34; 
Section 35 except NW\1/4\ NW\1/4\; SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\, 
NE\1/4\ SE\1/4\, NE\1/4\ Section 36.
    T.22N., R.09N. Willamette Meridian: Sections 1-5; E\1/2\, E\1/2\ 
W\1/2\ Section 6; E\1/2\, E\1/2\ W\1/2\ Section 7; Sections 8-25; 
Section 26 except SW\1/4\; Sections 27-33; Section 34 except S\1/2\ 
SE\1/4\; Section 35 except N\1/2\ NW\1/4\, W\1/2\ SW\1/4\.
    T.22N., R.10W. Willamette Meridian: SE\1/4\ Section 13; SE\1/4\ 
NW\1/4\, SW\1/4\ SW\1/4\, E\1/2\ SW\1/4\, SE\1/4\, E\1/2\ NE\1/4\ 
Section 24; SE\1/4\ NW\1/4\, SW\1/4\, E\1/2\ Section 25; W\1/2\ 
SW\1/4\, SE\1/4\ SE\1/4\ Section 27; S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ 
Section 31; SW\1/4\ NW\1/4\, E\1/2\ NW\1/4\, S\1/2\, S\1/2\ NE\1/4\ 
Section 32; NW\1/4\ NW\1/4\, S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\, NE\1/
4\ SE\1/4\ Section 33; W\1/2\ NW\1/4\, N\1/2\ SW\1/4\, NW\1/4\ SE\1/
4\, SE\1/4\ SE\1/4\, NE\1/4\ NE\1/4\ Section 34; Section 35 except 
SW\1/4\ SW\1/4\; Section 36.
    T.23N., R.07W. Willamette Meridian: Sections 1-3; S\1/2\, S\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\ Section 4; SW\1/4\ SW\1/4\ Section 7; SE\1/
4\ SW\1/4\, SE\1/4\, SE\1/4\ NE\1/4\ Section 8; Sections 9-17; 
Section 18 except N\1/2\ NE\1/4\; Sections 19-30; N\1/2\, N\1/2\ 
SW\1/4\, SE\1/4\ Section 31; Section 32-33; Section 34 except S\1/2\ 
SE\1/4\; Sections 35-36.
    T.23N., R.08W. Willamette Meridian: S\1/2\ NW\1/4\, N\1/2\ SW\1/
4\, SE\1/4\ SW\1/4\, SE\1/4\, S\1/2\ NE\1/4\ Section 11; Section 12 
except N\1/2\ N\1/2\; Sections 13-14; S\1/2\, NE\1/4\ Section 15; 
S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 16; SE\1/4\ SE\1/4\ Section 
20; S\1/2\, NE\1/4\ Section 21; Sections 22-29; W\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, S\1/2\, SE\1/4\ NE\1/4\ Section 30; Sections 31-34; 
Section 35 except E\1/2\ SE\1/4\; N\1/2\, NE\1/4\ SE\1/4\ Section 
36.
    T.23N., R.09W. Willamette Meridian: E\1/2\ NW\1/4\, SW\1/4\, 
SW\1/4\ SE\1/4\, W\1/2\ NE\1/4\ Section 15; S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\ Section 16; SE\1/4\ SE\1/4\ Section 19; S\1/2\, S\1/2\ NE\1/
4\, NE\1/4\ NE\1/4\ Section 20; Sections 21-22; W\1/2\ NW\1/4\, 
SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 23; SW\1/4\ SW\1/4\ 
Section 24; Sections 25-29; SW\1/4\, SW\1/4\, E\1/2\ SW\1/4\, SE\1/
4\, S\1/2\ NE\1/4\ NE\1/4\ NE\1/4\ Section 30; E\1/2\ W\1/2\, E\1/2\ 
Section 31; Sections 32-36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.009

    Map and description of WA-03-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Mt Olympus and Shelton, Washington; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.21N., R.06W. Willamette Meridian: W\1/2\, NW1/4 NE\1/4\ 
Section 3; Sections 4-8; E\1/2\, NE\1/4\ Section 9; N\1/2\ NW\1/4\ 
Section 10.
    T.22N., R.05W. Willamette Meridian: Sections 1-4; S\1/2\, SW\1/
4\ NW\1/4\, E\1/2\ NW\1/4\, NE\1/4\ Section 5; Sections 6-10; 
Section 11 except SE\1/4\ SE\1/4\; W\1/2\ Section 14; N\1/2\ NW\1/
4\, W\1/2\ SW\1/4\ Section 15; Sections 16-18; N\1/2\, W\1/2\ SW\1/
4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 19; Sections 20-22; 
Section 26; Section 28 except SW\1/4\ SW\1/4\; N\1/2\ NW\1/4\, NE\1/
4\ SE\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 29; NW\1/4\ 
NW\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, W\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\, S\1/2\ NE\1/4\ Section 30; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, 
N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, NE\1/4\ Section 31; W\1/2\, SE\1/
4\, S\1/2\ NE\1/4\ Section 32; W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ 
Section 33; NE\1/4\ Section 34; W\1/2\ W\1/2\, NE\1/4\ SW\1/4\ 
Section 36.
    T.22N., R.06W. Willamette Meridian: N\1/2\, E\1/2\ SE\1/4\ 
Section 1; NW\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 2; N\1/
2\ NE\1/4\ Section 3; NW\1/4\, W\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, 
NW\1/4\ SE\1/4\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 5; Section 
6 except S\1/2\ SE\1/4\; N\1/2\ NW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\ Section 8; S\1/2\ Section 9; S\1/2\ NW\1/4\, NE\1/4\ NW\1/
4\, S\1/2\, W\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 10; SW\1/4\, 
SW\1/4\ SE\1/4\ Section 11; NE\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 
12; Section 13; NW\1/4\, N\1/2\ SW\1/4\ Section 14; Sections 15-16; 
E\1/2\ Section 17; N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, S\1/2\ NE\1/4\, 
NW\1/4\ NE\1/4\ Section 19; Sections 20-21; W\1/2\ NW\1/4\, NE\1/4\ 
NW\1/4\, W\1/2\ SW\1/4\, E\1/2\ SE\1/4\ Section 22; S\1/2\, SW\1/4\ 
NE\1/4\ Section 23; NE\1/4\ NW\1/4\, W\1/2\ SW\1/4\, E\1/2\ SE\1/4\, 
N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 24; S\1/2\ N\1/2\, NW\1/4\ 
NW\1/4\, N\1/2\ S\1/2\, SE\1/4\ SE\1/4\, NE\1/4\ NE\1/4\ Section 25; 
N\1/2\, SW\1/4\ SW\1/4\, NE\1/4\ SE\1/4\ Section 26; Section 27 
except NW\1/4\ NE\1/4\; Sections 28-29; E\1/2\ Section 30; Section 
31 except W\1/2\ NW\1/4\; Sections 32-34; NW\1/4\ Section 35.
    T.23N., R.05W. Willamette Meridian: W\1/2\ W\1/2\ Section 4; 
S\1/2\ N\1/2\, S\1/2\ Section 5; S\1/2\ N\1/2\, S\1/2\ Section 6; 
Sections 7-9; W\1/2\ SW\1/4\ Section 10; S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 14; NW\1/4\, NW\1/4\ SW\1/4\, S\1/2\ SW\1/4\, S\1/2\ 
SE\1/4\ Section 15; Sections 16-22; Section 23 except

[[Page 26285]]

SE\1/4\ NE\1/4\, N\1/2\ NE\1/4\; NW\1/4\ SW\1/4\, S\1/2\ SW\1/4\ 
Section 24; W\1/2\ Section 25; Sections 26-35; Section 36 except 
NE\1/4\.
    T.23N., R.06W. Willamette Meridian: SE\1/4\ NW\1/4\, S\1/2\, 
S\1/2\ NE\1/4\ Section 1; E\1/2\ SE\1/4\ Section 2; SW\1/4\ NW\1/4\, 
SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 4; Sections 5-9; 
NW\1/4\ NW\1/4\, S\1/2\ N\1/2\, S\1/2\ Section 10; Sections 11-32; 
Section 33 except SE\1/4\ SE\1/4\; Section 34 except SW\1/4\; 
Sections 35-36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.010

    Map and description of WA-04-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Shelton and Chehalis River, Washington; 
1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T.16N., R.03W. Willamette Meridian: NW\1/4\, W\1/2\ SW\1/4\, 
W\1/2\ NE\1/4\ Section 4; Sections 5-7; NW\1/4\, W\1/2\ SW\1/4\, 
W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 8; NW\1/4\ NW\1/4\; NW\1/4\ 
NW\1/4\ Section 16; W\1/2\, NE\1/4\ Section 17; Section 18; Section 
19 except S\1/2\ SE\1/4\.
    T.16N., R.04W. Willamette Meridian: Sections 1-17; Section 18 
except SW\1/4\; NE\1/4\ Section 19; Section 20 except W\1/2\ SW\1/
4\; Sections 21-23; N\1/2\ NW\1/4\ Section 26; Section 27 except 
E\1/2\ SE\1/4\; N\1/2\ NW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, 
NE\1/4\ Section 28; N\1/2\ NW\1/4\, W\1/2\ NE\1/4\ Section 33.
    T.16N., R.05W. Willamette Meridian: S\1/2\ SW\1/4\, SE\1/4\ 
Section 1; S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 2; N\1/2\, SW\1/
4\, NW\1/4\ SE\1/4\ Section 11; N\1/2\ Section 12; Section 13 except 
N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\.
    T.17N., R.03W. Willamette Meridian: Section 19; Sections 30-32; 
Section 33 except SE\1/4\ SE\1/4\.
    T.17N., R.04W. Willamette Meridian: Sections 14-36.
    T.17N., R.05W. Willamette Meridian: Section 13; E\1/2\ Section 
14; S\1/2\, NE\1/4\ Section 23; Sections 24-25; NW\1/4\ SW\1/4\, 
S\1/2\ S\1/2\ Section 26; S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ 
NE\1/4\ Section 27; Sections 35-36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.011

    Map and description of WA-05-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Chehalis River, Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T.12N., R.08W. Willamette Meridian: Section 2 except NE\1/4\ 
NE\1/4\; Sections 3-5; Section 9; Section 10 except NW\1/4\ NW\1/4\; 
W\1/2\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 11; W\1/2\, W\1/2\ 
NE\1/4\ Section 14; Sections 15-16.
    T.12N., R.09W. Willamette Meridian: N\1/2\, N\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\ Section 1.
    T.13N., R.08W. Willamette Meridian: SW\1/4\ SW\1/4\ Section 4; 
Section 5 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\; SE\1/4\ NW\1/4\, 
S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, S\1/2\ NE\1/4\ Section 6; Section 7 
except SE\1/4\ NW\1/4\; NW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, W\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\ Section 8; SW\1/4\ Section 14; NE\1/4\ 
SW\1/4\, SE\1/4\ Section 15; Sections 16-20; N\1/2\ Section 21; 
SW\1/4\ NW\1/4\, S\1/2\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 22; 
W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, SW\1/4\ Section 23; Section 28-29; 
Section 30 except N\1/2\ N\1/2\; Sections 32-33.
    T.13N., R.09W. Willamette Meridian: Section 16; S\1/2\ N\1/2\, 
S\1/2\, NE\1/4\ NE\1/4\ Section 24; E\1/2\ NW\1/4\, NW\1/4\ SE\1/4\, 
E\1/2\ SE\1/4\, NE\1/4\ Section 25; Section 36 except N\1/2\ NW\1/
4\.
    T.14N., R.09W. Willamette Meridian: Section 36 except NE\1/4\ 
NE\1/4\.
    T.14N., R.10W. Willamette Meridian: S\1/2\, S\1/2\ NE\1/4\ 
Section 25; S\1/2\ Section 26; SE\1/4\ Section 27; Section 34 except 
NW\1/4\ NW\1/4\; Section 35 except NW\1/4\ NE\1/4\, SE\1/4\ NE\1/4\; 
Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.012

    Map and description of WA-05-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Astoria, Oregon-Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T.10N., R.09W. Willamette Meridian: N\1/2\, N\1/2\ SE\1/4\, 
NE\1/4\ SW\1/4\ Section 3; N\1/2\ NE\1/4\ Section 4.
    T.11N., R.09W. Willamette Meridian: Sections 4-10; W\1/2\ 
Section 14; Sections 15-18; Section 19 except SW\1/4\ SW\1/4\; 
Sections 20-22; Sections 27-29; NW\1/4\, E\1/2\ Section 33; Section 
34 except SW\1/4\.
    T.11N., R.10W. Willamette Meridian: Section 1; E\1/2\ NW\1/4\, 
E\1/2\ Section 2; E\1/2\ E\1/2\ Section 11; Section 12; N\1/2\ NW\1/
4\, SE\1/4\ NW\1/4\, NW\1/4\ SE\1/4\, E\1/2\ SE\1/4\, NE\1/4\ 
Section 13; Section 36 except E\1/2\ NE\1/4\.
    T.12N., R.10W. Willamette Meridian: NW\1/4\, E\1/2\ NE\1/4\ 
Section 34; Section 36.

    Critical Habitat includes only Private lands described within the 
following areas:
    T.11N., R.10W. Willamette Meridian: S\1/2\ NW\1/4\, N\1/2\ SW\1/
4\, SW\1/4\ SW\1/4\, that portion of the SE\1/4\ SW\1/4\ west of 
Ellsworth Creek, NW\1/4\ SE\1/4\, SW\1/4\ NE\1/4\ Section 35.
    T.10N., R.10W. Willamette Meridian: NW\1/4\ NW\1/4\, NW\1/4\ 
NE\1/4\ Section 2; NE\1/4\ NE\1/4\ Section 3.
[GRAPHIC] [TIFF OMITTED] TR24MY96.013

    Map and description of WA-05-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Astoria, Oregon-Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T.10N., R.10W. Willamette Meridian: Section 36.

    Critical Habitat includes only Private lands described within the 
following areas:

    T.09N., R.09W. Willamette Meridian: NW1/4, W1/2 NE1/4 Section 5.
    T.10N., R.09W. Willamette Meridian: That portion of the S1/2 
SW1/4 Section 32 south of Bean Creek.

[[Page 26286]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.014

    Map and description of WA-05-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Flattery, Washington; Astoria, 
Oregon-Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T. 10N., R. 06W. Willamette Meridian: Sections 2-5; N\1/2\ 
Section 6; S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, N\1/2\ NE\1/4\, SE\1/4\ 
NE\1/4\ Section 7; Sections 8-10; Sections 14-17; E\1/2\ Section 18; 
Section 19; SW\1/4\ NW\1/4\, SW\1/4\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/
4\ Section 20; Section 21-27; S\1/2\ NW\1/4\, S\1/2\ Section 28; 
NE\1/4\ Section 29; NW\1/4\, W\1/2\ NE\1/4\ Section 30; N\1/2\, N\1/
2\ SW\1/4\ Section 33; N\1/2\, W\1/2\ SE\1/4\ Section 34; N\1/2\, 
SW\1/4\, NW\1/4\ SE\1/4\ Section 35; N\1/2\, NW\1/4\ SW\1/4\, S\1/2\ 
SE\1/4\, NE\1/4\ SE\1/4\ Section 36.
    T. 10N., R. 08W. Willamette Meridian: N\1/2\ NW\1/4\, NW\1/4\ 
NE\1/4\ Section 1; Section 2; NW\1/4\ Section 10; E\1/2\ NW\1/4\, 
N\1/2\ SE\1/4\, NE\1/4\ Section 11; W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, 
SW\1/4\ NE\1/4\ Section 12.
    T. 11N., R. 07W. Willamette Meridian: N\1/2\, SW\1/4\, W\1/2\ 
SE\1/4\ Section 8; Section 16 except SE\1/4\ SE\1/4\; Sections 17-
20; W\1/2\, SW\1/4\ SE\1/4\ Section 21; N\1/2\ Section 29; N\1/2\, 
SW\1/4\ Section 30; N\1/2\ NW\1/4\ Section 31; Section 36.
    T. 11N., R. 08W. Willamette Meridian: S\1/2\, S\1/2\ NE\1/4\ 
Section 21; NW\1/4\ NW\1/4\, S\1/2\ NW\1/4\, SE\1/4\ Section 22; 
Sections 24-28; E\1/2\ SE\1/4\, NE\1/4\ Section 33; N\1/2\, SE\1/4\ 
Section 34; Sections 35-36.

    Critical Habitat includes only Private lands described within the 
following areas:

    T. 10N., R. 07W. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\ Section 2; NE\1/4\ Section 3.
    T. 11N., R. 07W. Willamette Meridian: S\1/2\ SW\1/4\ Section 35.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.015
    
    Map and description of WA-05-e taken from United States Fish and 
Wildlife Service 1:100,000 map; Astoria, Oregon-Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T. 08N., R. 04W. Willamette Meridian: S\1/2\ Section 6; N\1/2\ 
Section 7.
    T. 08N., R. 05W. Willamette Meridian: Section 1; NE\1/4\ Section 
2; E\1/2\, W\1/2\ NE\1/4\ Section 3; Section 4; N\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\ Section 5; NW\1/4\, SE\1/4\, N\1/2\ NE\1/4\ Section 
9; SW\1/4\ Section 10; NE\1/4\ Section 12; Section 16; N\1/2\, N\1/
2\ SE\1/4\ Section 21.
    T. 09N., R. 04W. Willamette Meridian: Section 3; SE\1/4\ Section 
7; Sections 18-19; Sections 30-31.
    T. 09N., R. 05W. Willamette Meridian: Section 1; N\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 2; SW\1/4\ 
SE\1/4\, E\1/2\ SE\1/4\ Section 10; Section 11 except N\1/2\ NW\1/
4\; Sections 12-14; Section 15 except N\1/2\ NW\1/4\; S\1/2\ SE\1/4\ 
Section 16; SE\1/4\, SE\1/4\ NE\1/4\ Section 21; Sections 22-28; 
SE\1/4\ SE\1/4\ Section 29; W\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ 
SE\1/4\ SE\1/4\, E\1/2\ NE\1/4\ Section 33; Section 34 except NW\1/
4\; Sections 35-36.
    T.10N., R.04W. Willamette Meridian: Section 28 except NE\1/4\ 
NE\1/4\; W\1/2\, NE\1/4\ Section 32; Section 34.
[GRAPHIC] [TIFF OMITTED] TR24MY96.016

    Map and description of WA-05-f taken from United States Fish and 
Wildlife Service 1:100,000 map; Astoria, Oregon-Washington; 1995.
    Critical Habitat includes only Private lands described within the 
following areas:

    T.11N., R.05W. Willamette Meridian: E\1/2\ NW\1/4\, that portion 
of the NE\1/4\ west of the East Fork Chehalis River Section 15.
[GRAPHIC] [TIFF OMITTED] TR24MY96.017

    Map and description of WA-05-g taken from United States Fish and 
Wildlife Service 1:100,000 map; Astoria, Oregon-Washington; 1995.
    Critical Habitat includes only Private lands described within the 
following areas:

    T.11N., R.06W. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\ Section 5; SE\1/4\ NE\1/4\ Section 6.
    T.12N., R.07W. Willamette Meridian: N\1/2\ SW\1/4\ Section 28.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.018
    
    Map and description of WA-05-h taken from United States Fish and 
Wildlife Service 1:100,000 map; Chehalis River, Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T.12N, R.05W. Willamette Meridian: NW\1/4\ Section 6.
    T.12N, R.06W. Willamette Meridian: NE\1/4\ Section 1; N\1/2\, 
N\1/2\ S\1/2\ Section 3; N\1/2\ N\1/2\ Section 6.
    T.12N, R.07W. Willamette Meridian: N\1/2\, N\1/2\ SW\1/4\ 
Section 1; N\1/2\, N\1/2\ S\1/2\ Section 2, NE\1/4\ Section 3.

[[Page 26287]]

    T.12N, R.08W. Willamette Meridian: NE\1/4\ Section 1.
    T.13N, R.05W. Willamette Meridian: S\1/2\ S\1/2\ Section 7; 
NE\1/4\ SW\1/4\, S\1/2\ SW\1/4\, SE\1/4\ Section 8; S\1/2\ SW\1/4\, 
NE\1/4\ SW\1/4\ Section 9; S\1/2\ Section 10; Sections 15-21; 
Section 22 except SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\, E\1/2\ E\1/2\; 
N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 27; NE\1/4\ Section 28; 
Section 29-31; Section 32 except W\1/2\ SW\1/4\.
    T.13N, R.06W. Willamette Meridian: NW\1/4\, W\1/2\ SW\1/4\, 
NE\1/4\ SW\1/4\, W\1/2\ NE\1/4\ Section 5; Sections 6-7; W\1/2\ 
NW\1/4\ Section 8; S\1/2\ SE\1/4\ Section 10; S\1/2\ SW\1/4\, SE\1/
4\ Section 11; S\1/2\ Section 12; Sections 13-15; SE\1/4\ Section 
16; Sections 18-33; Section 34 except SW\1/4\ SW\1/4\; Section 35; 
N\1/2\, SW\1/4\ NW\1/4\, SW\1/4\ SW\1/4\, E\1/2\ SE\1/4\ Section 36.
    T.13N, R.07W. Willamette Meridian: Sections 1-2; Section 3 
except N\1/2\ NW\1/4\; N\1/2\, W\1/2\ SW\1/4\ Section 6; W\1/2\, 
SW\1/4\ SE\1/4\ Section 7; SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\ Section 
9; Section 10 except NE\1/4\; Sections 11-16; W\1/2\ SW\1/4\, SE\1/
4\ SW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ Section 17; 
NW\1/4\, E\1/2\ Section 18; S\1/2\ NW\1/4\, S\1/2\, E\1/2\ NE\1/4\ 
Section 19; N\1/2\, SE\1/4\ Section 20; Sections 21-24; Section 27; 
Section 29 except W\1/2\ NW\1/4\; S\1/2\ Section 30; W\1/2\ Section 
31; NW\1/4\, NW\1/4\ NE\1/4\, Section 32; Section 36.
    T.13N, R.08W. Willamette Meridian: S\1/2\ Section 1; S\1/2\ 
SE\1/4\ Section 2; N\1/2\ NW\1/4\, SE\1/4\ SW\1/4\, E\1/2\ Section 
12.
    T.14N, R.06W. Willamette Meridian: SW\1/4\ NW\1/4\, W\1/2\ SW\1/
4\ Section 31.
    T.14N, R.07W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 34; 
SW\1/4\ SW\1/4\, SE\1/4\ SE\1/4\ Section 35; Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.019

    Map and description of WA-06-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Port Angeles, Mt Olympus and Seattle, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.26N., R.02W. Willamette Meridian: W\1/2\ SW\1/4\, NE\1/4\ 
SE\1/4\, NE\1/4\ Section 2; Section 3 except E\1/2\ NE\1/4\; NW\1/
4\, E\1/2\ Section 4; W\1/2\, W\1/2\ SE\1/4\, N\1/2\ NE\1/4\ Section 
5; Sections 6-7; W\1/2\, S\1/2\ SE\1/4\ Section 8; S\1/2\ S\1/2\, 
NE\1/4\ NE\1/4\ Section 9; Section 10 except SW\1/4\ NW\1/4\; 
Section 14 except E\1/2\ SE\1/4\; N\1/2\ NW\1/4\, S\1/2\ SW\1/4\, 
NE\1/4\ SE\1/4\, E\1/2\ NE\1/4\, NW\1/4\ NE\1/4\ Section 15; Section 
16-21; W\1/2\, SW\1/4\ SE\1/4\ Section 22; Section 27 except NE\1/4\ 
NE\1/4\.
    T.26N., R.03W. Willamette Meridian: Sections 1-3; E\1/2\, E\1/2\ 
W\1/2\ Section 10; Sections 11-13; Section 14 except the SW\1/4\ 
SW\1/4\; S\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, SW\1/4\, SW\1/4\ SE\1/4\, 
NE\1/4\ Section 15; S\1/2\ Section 16; SE\1/4\ SE\1/4\ Section 17; 
S\1/2\ N\1/2\, N\1/2\ S\1/2\ Section 19; S\1/2\ NW\1/4\, NE\1/4\ 
NW\1/4\, N\1/2\ SW\1/4\, NE\1/4\ Section 20; NE\1/4\ Section 21; 
N\1/2\ NW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 22; Section 23 
except SW\1/4\ SW\1/4\, NE\1/4\ SE\1/4\; Section 24 except N\1/2\ 
SW\1/4\.
    T.26N., R.04W. Willamette Meridian: E\1/2\ NW\1/4\, NE\1/4\ 
SW\1/4\, NE\1/4\ Section 24.
    T.27N., R.02W. Willamette Meridian: SW\1/4\ SW\1/4\ Section 5; 
Section 6 except NE\1/4\ NE\1/4\; Section 7; W\1/2\ W\1/2\ Section 
8; W\1/2\, W\1/2\ SE\1/4\ Section 17; Sections 18-19; Section 20 
except the NE\1/4\ NE\1/4\; S\1/2\ NW\1/4\, SW\1/4\ Section 28; 
Sections 29-33; W\1/2\, N\1/2\ NE\1/4\ Section 34; N\1/2\ NW\1/4\, 
E\1/2\ Section 35.
    T.27N., R.03W. Willamette Meridian: Sections 1-2; N\1/2\ SE\1/
4\, SE\1/4\ SE\1/4\, NE\1/4\ Section 3; Section 11-13; Section 14 
except SW\1/4\ NW\1/4\; SE\1/4\ Section 15; E\1/2\, SE\1/4\ SW\1/4\ 
Section 22; Sections 23-26; Section 27 except NW\1/4\ NW\1/4\; S\1/
2\ Section 28; E\1/2\ NW\1/4\, NE\1/4\ Section 33; N\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, E\1/2\ Section 34; 
Sections 35-36.
    T.28N., R.02W. Willamette Meridian: N\1/2\ N\1/2\, SW\1/4\ NE\1/
4\ Section 5; SW\1/4\ SW\1/4\ Section 7; S\1/2\ SW\1/4\ Section 8; 
N\1/2\ NW\1/4\, NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 17; NW\1/4\, 
S\1/2\ NE\1/4\ Section 18; NW\1/4\, S\1/2\ SW\1/4\ Section 20; SW\1/
4\ Section 28; NW\1/4\, W\1/2\ NE\1/4\ Section 29; SE\1/4\ SW\1/4\, 
S\1/2\ SE\1/4\ Section 30; S\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\, 
N\1/2\ NE\1/4\ Section 31.
    T.28N., R.03W. Willamette Meridian: N\1/2\, W\1/2\ SE\1/4\, 
NE\1/4\ SE\1/4\ Section 1; W\1/2\, SW\1/4\ SE\1/4\, NE\1/4\ Section 
2; Sections 3-10; W\1/2\, NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 
11; S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, SE\1/4\, SE\1/4\ NE\1/4\ 
Section 12; Sections 13-23; N\1/2\, NW\1/4\ SW\1/4\, NE\1/4\ SE\1/4\ 
Section 24; N\1/2\ SW\1/4\, W\1/2\ NW\1/4\ Section 25; Sections 26-
29; N\1/2\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\, N\1/2\ SE\1/4\ Section 
30; NE\1/4\ NW\1/4\, E\1/2\ Section 32; Section 33 except S\1/2\ 
SW\1/4\, SW\1/4\ SE\1/4\; Section 34; Section 35 except NE\1/4\ 
SE\1/4\, SE\1/4\ NE\1/4\; SE\1/4\ Section 36.
    T.28N., R.04W. Willamette Meridian: NE\1/4\ NE\1/4\ Section 1; 
SE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ Section 12; S\1/2\ SW\1/4\, NE\1/4\ 
SW\1/4\, SE\1/4\, SW\1/4\ NE\1/4\, E\1/2\ NE\1/4\ Section 13; E\1/2\ 
SE\1/4\, SE\1/4\ NE\1/4\ Section 23; Sections 24-25; SE\1/4\ SW\1/
4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, E\1/2\ NE\1/4\ Section 26; E\1/
2\ W\1/2\, E\1/2\ Section 35; NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/
4\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 36.
    T.29N., R.02W. Willamette Meridian: W\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, S\1/2\, S\1/2\ NE\1/4\ Section 30; SW\1/4\ NW\1/4\, W\1/2\ 
SW\1/4\, NE\1/4\ SE\1/4\ Section 31; W\1/2\ NW\1/4\, SE\1/4\ NW\1/
4\, SW\1/4\, W\1/2\ SE\1/4\ Section 32.
    T.29N., R.03W. Willamette Meridian: Section 19; NW\1/4\, W\1/2\ 
SW\1/4\ Section 20; SE\1/4\ SE\1/4\ Section 22; SE\1/4\ NW\1/4\, 
S\1/2\, SW\1/4\ NE\1/4\, E\1/2\ NE\1/4\ Section 23; Section 24 
except NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; Section 25; N\1/2\, N\1/2\ 
SW\1/4\, E\1/2\ SE\1/4\ Section 26; S\1/2\, SW\1/4\ NE\1/4\, E\1/2\ 
NE\1/4\ Section 27; SE\1/4\ NW\1/4\, SW\1/4\ Section 28; Section 29 
except NE\1/4\ NE\1/4\; Sections 30-34; S\1/2\, SW\1/4\ NW\1/4\, 
NE\1/4\ NE\1/4\ Section 35; Section 36.
    T.29N., R.04W. Willamette Meridian: S\1/2\, S\1/2\ NW\1/4\, 
NW\1/4\ NW\1/4\, SW\1/4\ NE\1/4\ Section 19; S\1/2\ Section 20; S\1/
2\ Section 21; E\1/2\ W\1/2\, SW\1/4\ SW\1/4\, W\1/2\ SE\1/4\, NE\1/
4\ Section 22; E\1/2\ SW\1/4\, NW\1/4\ SW\1/4\, E\1/2\, NW\1/4\ 
NW\1/4\ Section 23; Section 24; Section 25 except NW\1/4\ NW\1/4\; 
W\1/2\ NW\1/4\, NE\1/4\ SW\1/4\, E\1/2\ Section 26; N\1/2\, N\1/2\ 
SE\1/4\ Section 27; Sections 28-30; N\1/2\ Section 32; N\1/2\ NW\1/
4\, SW\1/4\ NW\1/4\, NW\1/4\ NE\1/4\ Section 33; E\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\, NE\1/4\ SW\1/4\ Section 34; W\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, N\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, N\1/2\ SE\1/4\, S\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\ Section 35; Section 36 except SW\1/4\ SW\1/
4\.

    Critical Habitat includes only State or County lands described 
within the following areas:

    T.29N., R.03W. Willamette Meridian: W\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\, SW\1/4\ SE\1/4\ Section 4; S\1/2\ SW\1/4\, SE\1/4\, SW\1/4\ 
NE\1/4\ Section 5; SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, S\1/2\ SE\1/4\ 
Section 6; Section 7 except E\1/2\ NW\1/4\; Sections 8-9; W\1/2\ 
NW\1/4\, SE\1/4\ NW\1/4\, SW\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ Section 
10; NW\1/4\, E\1/2\ SW\1/4\, SE\1/4\, SE\1/4\ NE\1/4\ Section 11; 
NW\1/4\, E\1/2\ SW\1/4\ Section 13; Section 14 except W\1/2\ NW\1/
4\, SE\1/4\ NW\1/4\; N\1/2\ NW\1/4\ Section 15; W\1/2\, NW\1/4\ 
NE\1/4\, NW\1/4\ SE\1/4\ Section 16; Section 17; NW\1/4\ NW\1/4\, 
E\1/2\ NW\1/4\, NE\1/4\ SW\1/4\, E\1/2\ Section 18; S\1/2\ NW\1/4\, 
NE\1/4\ SE\1/4\, NE\1/4\ Section 21; NE\1/4\ NE\1/4\ Section 28.
    T.29N, R.04W. Willamette Meridian: E\1/2\ SE\1/4\, SW\1/4\ SE\1/
4\ Section 1; E\1/2\, SE\1/4\ SW\1/4\ Section 12; E\1/2\ NW\1/4\, 
NE\1/4\ SW\1/4\, N\1/2\ SE\1/4\, SW\1/4\ SE\1/4\, NE\1/4\ Section 
18.

[[Page 26288]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.020

    Map and description of WA-06-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Mt Olympus and Shelton, Washington; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.23N., R.04W. Willamette Meridian: NW\1/4\, N\1/2\ NE\1/4\ 
Section 3; Section 4 except SE\1/4\ SE\1/4\; Sections 5-6; N\1/2\ 
Section 7; N\1/2\ Section 8; NW\1/4\ Section 9.
    T.23N., R.05W. Willamette Meridian: E\1/2\ SW\1/4\, SE\1/4\ 
Section 3; NE\1/4\ NW\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ Section 10; 
S\1/2\ N\1/2\, N\1/2\ S\1/2\ Section 11; S\1/2\ NW\1/4\, NE\1/4\ 
NW\1/4\, NE\1/4\ Section 12.
    T.24N., R.03W. Willamette Meridian: Sections 5-6; NW\1/4\, NW\1/
4\ NE\1/4\ Section 7.
    T.24N., R.04W. Willamette Meridian: Sections 1-5; E\1/2\ E\1/2\ 
Section 6; Section 7 except NW\1/4\ NW\1/4\, SE\1/4\ SE\1/4\; 
Sections 8-16; SE\1/4\ SW\1/4\, E\1/2\ Section 17; N\1/2\ NW\1/4\ 
Section 18; N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\ Section 19; Sections 20-24; Section 25 except SE\1/4\ SE\1/
4\; Sections 26-29; SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 
30; Section 31 except NW\1/4\ NW\1/4\; Sections 32-35; N\1/2\ NW\1/
4\ Section 36.
    T.24N., R.05W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 12; 
N\1/2\ NW\1/4\, NE\1/4\ Section 13.
    T.25N., R.03W. Willamette Meridian: Section 1 except E\1/2\ 
SW\1/4\, W\1/2\ SE\1/4\; Sections 2-3; E\1/2\ E\1/2\ Section 4; E\1/
2\ E\1/2\ Section 9; Sections 10-12; N\1/2\, N\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\ Section 13; Sections 14-15; Section 16 except NW\1/4\ NW\1/
4\; SE\1/4\ NW\1/4\, S\1/2\, S\1/2\ NE\1/4\ Section 17; SE\1/4\ 
SE\1/4\ Section 18; E\1/2\ NW\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, 
E\1/2\ Section 19; Sections 20-21; Section 22 except S\1/2\ SE\1/4\; 
SE\1/4\ Section 23; S\1/2\ NW\1/4\, S\1/2\ Section 24; Section 25; 
S\1/2\ NW\1/4\, SW\1/4\, E\1/2\ SE\1/4\, SW\1/4\ NE\1/4\ Section 26; 
NW\1/4\, N\1/2\ S\1/2\, S\1/2\ NE\1/4\ Section 27; Sections 28-32; 
Section 33 except E\1/2\ E\1/2\, SW\1/4\ SE\1/4\; SE\1/4\ NW\1/4\, 
E\1/2\ SW\1/4\; NW\1/4\ SE\1/4\, NE\1/4\ Section 36.
    T.25N., R.04W. Willamette Meridian: E\1/2\ E\1/2\, SW\1/4\ SE\1/
4\ Section 25; SW\1/4\ Section 26; S\1/2\, S\1/2\ NE\1/4\ Section 
27; S\1/2\, NE\1/4\ Section 33; Sections 34-36.
    T.26N., R.02W. Willamette Meridian: Section 31.
    T.26N., R.03W. Willamette Meridian: Section 25; E\1/2\ Section 
26; S\1/2\ Section 34; Section 35 except W\1/2\ NW\1/4\; Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.021

    Map and description of WA-07-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Bellingham and Mt. Baker, Washington; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.37N., R.06E. Willamette Meridian: NE\1/4\ Section 1.
    T.37N., R.07E. Willamette Meridian: W\1/2\, W\1/2\ E\1/2\ 
Section 3; Sections 4-5; N\1/2\, N\1/2\ SE\1/4\ Section 6; NE\1/4\ 
NW\1/4\, N\1/2\ NE\1/4\ Section 8; NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\ 
Section 10.
    T.38N., R.06E. Willamette Meridian: Section 1; Sections 12-13; 
E\1/2\, E\1/2\ W\1/2\ Section 36.
    T.38N., R.07E. Willamette Meridian: NW\1/4\, N\1/2\ SW\1/4\, 
SW\1/4\ SW\1/4\ Section 3; Sections 4-8; Section 9 except S\1/2\ 
SE\1/4\; W\1/2\ NW\1/4\ Section 10; NW\1/4\ Section 16; Section 17 
except E\1/2\ SE\1/4\; Sections 18-19; NW\1/4\, W\1/2\ NE\1/4\, 
NW\1/4\ SW\1/4\ Section 20; SW\1/4\, W\1/2\ SE\1/4\ Section 27; E\1/
2\ SE\1/4\ Section 28; SW\1/4\ SW\1/4\ Section 29; Section 30 except 
NE\1/4\ SE\1/4\; Sections 31-33; W\1/2\ Section 34.
    T.39N., R.06E. Willamette Meridian: Section 25; Section 36.
    T.39N., R.07E. Willamette Meridian: Sections 1-4; Section 5 
except SW\1/4\ SW\1/4\, SE\1/4\ SE\1/4\; E\1/2\ Section 8; Sections 
9-12; Sections 14-15; N\1/2\, SE\1/4\ Section 16; NE\1/4\ Section 
17; Section 21 except NW\1/4\; W\1/2\ Section 22; NE\1/4\ NW\1/4\, 
N\1/2\ NE\1/4\ Section 23; W\1/2\, SW\1/4\ NE\1/4\ Section 27; 
Section 28; W\1/2\ SW\1/4\ Section 30; Sections 31-33; W\1/2\ 
Section 34.
    T.39N., R.08E. Willamette Meridian: Sections 1-12; W\1/2\ 
Section 15; Sections 16-17; SE\1/4\ SW\1/4\, SE\1/4\, S\1/2\ NE\1/
4\, NE\1/4\ NE\1/4\ Section 19; Sections 20-21; W\1/2\ Section 22.
    T.39N., R.09E. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\, NW\1/4\ SW\1/4\, S\1/2\ SW\1/4\, N\1/2\ NE\1/4\ Section 3; 
Sections 4-8; Section 9 except SW\1/4\ SE\1/4\; Section 10 except 
E\1/2\ E\1/2\; SW\1/4\ NW\1/4\, NW\1/4\ SW\1/4\ Section 14; NE\1/4\ 
NW\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ Section 15; W\1/2\ Section 16; 
Section 17; NE\1/4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 18; 
NE\1/4\ NW\1/4\, NE\1/4\ Section 20; NW\1/4\, N\1/2\ SW\1/4\, W\1/2\ 
NE\1/4\ Section 21.
    T.40N., R.07E. Willamette Meridian: Sections 1-4; E\1/2\, E\1/2\ 
W\1/2\ Section 5; E\1/2\ NW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 8; 
Section 9 except SW\1/4\ SW\1/4\; Sections 10-15; E\1/2\ NW\1/4\, 
E\1/2\ Section 16; SE\1/4\, E\1/2\ SW\1/4\ Section 20; SW\1/4\, E\1/
2\ Section 21; Sections 22-28; E\1/2\ W\1/2\, E\1/2\ Section 29; 
Sections 32-36.
    T.40N., R.08E. Willamette Meridian: Section 2 except NE\1/4\, 
NE\1/4\ NW\1/4\, NE\1/4\ SE\1/4\; Sections 3-10; Section 11 except 
S\1/2\ SE\1/4\; NW\1/4\ Section 12; NW\1/4\, N\1/2\ SW\1/4\, NW\1/4\ 
SE\1/4\, NE\1/4\ Section 15; Sections 16-20; NW\1/4\, W\1/2\ SW\1/
4\, NW\1/4\ NE\1/4\ Section 29; Sections 30-31; S\1/2\, W\1/2\ NW\1/
4\, S\1/2\ NE\1/4\ Section 32; Section 33 except NW\1/4\ NW\1/4\; 
Sections 34-36.
    T.40N., R.09E. Willamette Meridian: SE\1/4\ SE\1/4\ Section 19; 
S\1/2\ NW\1/4\, SW\1/4\, W\1/2\ E\1/2\ Section 20; Section 29 except 
E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, 
S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, E\1/2\ NE\1/4\ Section 30; Sections 
31-32; S\1/2\ S\1/2\, N\1/2\ SE\1/4\ Section 33; Section 34 except 
N\1/2\ N\1/2\; S\1/2\ N\1/2\, SW\1/4\, N\1/2\ SE\1/4\, SW\1/4\ SE\1/
4\ Section 35.
    T.41N., R.07E. Willamette Meridian: Sections 32-36.
    T.41N., R.08E. Willamette Meridian: Sections 31-34, W\1/2\ SW\1/
4\ Section 35.

[[Page 26289]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.022

    Map and description of WA-07-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Bellingham, Washington; 1995.
    Critical Habitat includes only State or County lands described 
within the following areas:

    T.37N., R.06E. Willamette Meridian: SW\1/4\ SW\1/4\ Section 20; 
NE\1/4\ NE\1/4\ Section 28.

    Critical Habitat includes only Private lands described within the 
following areas:

    T.37N., R.06E. Willamette Meridian: N\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\, SE\1/4\ Section 20; SW\1/4\ Section 21; Section 28 except 
NE\1/4\; N\1/2\ NE\1/4\ Section 29; N\1/2\ NW\1/4\ Section 33.
[GRAPHIC] [TIFF OMITTED] TR24MY96.023

    Map and description of WA-07-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Mt Baker and Sauk River, Washington; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.35N., R.09E. Willamette Meridian: Sections 1-2; E\1/2\ W\1/2\, 
E\1/2\ Section 11; Section 12; NE\1/4\ NE\1/4\ Section 13; NE\1/4\ 
NW\1/4\, N\1/2\ NE\1/4\ Section 14.
    T.35N., R.10E. Willamette Meridian: W\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, SW\1/4\, S\1/2\ SE\1/4\ Section 6; Section 7; Section 8 
except N\1/2\ NE\1/4\; W\1/2\ SW\1/4\ Section 9; N\1/2\ NW\1/4\ 
Section 17; N\1/2\ NE\1/4\, NW\1/4\ Section 18.
    T.36N., R.07E. Willamette Meridian: Section 1; E\1/2\ SE\1/4\, 
NE\1/4\ Section 2; Section 3; E\1/2\ E\1/2\ Section 4.
    T.36N., R.08E. Willamette Meridian: Section 5; W\1/2\ W\1/2\ 
Section 6.
    T.36N., R.09E. Willamette Meridian: Sections 1-4; E\1/2\ Section 
5; Section 8 except S\1/2\ SE1/4; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\, 
NE\1/4\ NE\1/4\ Section 9; N\1/2\ NW\1/4\, N\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\, NW\1/4\ NE\1/4\ Section 10; Section 11 except S\1/2\ NW\1/
4\, NE\1/4\ NW\1/4\; Sections 12-15; Sections 21-24; S\1/2\ NW\1/4\ 
Section 26; Section 27 except SW\1/4\ SW\1/4\; Section 28 except 
SE\1/4\ SE\1/4\; S\1/2\, S\1/2\ NE\1/4\, SE\1/4\ NW\1/4\ Section 33.
    T.36N., R.10E. Willamette Meridian: SW\1/4\ SW\1/4\ Section 5; 
S\1/2\ S\1/2\ Section 6; Section 7; W\1/2\ W\1/2\ Section 8; W\1/2\, 
W\1/2\ SE\1/4\ Section 17; Sections 18-20; SW\1/4\ Section 21; W\1/
2\ Section 28; Sections 29-30; N\1/2\, SW\1/4\ Section 31; N\1/2\ 
N\1/2\ Section 32; N\1/2\ NW\1/4\ Section 33.
    T.37N., R.07E. Willamette Meridian: S\1/2\ SE\1/4\ Section 9; 
S\1/2\, S\1/2\ NE\1/4\ Section 10; S\1/2\, NE\1/4\ Section 11; SW\1/
4\ NW\1/4\, NW\1/4\ SW\1/4\ Section 12; W\1/2\ NW\1/4\, W\1/2\ SW\1/
4\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\ Section 13; Sections 14-15; 
Section 16 except NW\1/4\ NW\1/4\; E\1/2\ SE\1/4\ Section 17; NE\1/
4\ NE\1/4\ Section 20; Sections 21-27; Section 28 except E\1/2\ E\1/
2\, SE\1/4\ SW\1/4\; E\1/2\, NE\1/4\ NW\1/4\ Section 33; Sections 
34-36.
    T.37N., R.08E. Willamette Meridian: Sections 1-3; N\1/2\ NW\1/
4\, SE\1/4\ NW\1/4\, N\1/2\ SE\1/4\ SE\1/4\ SE\1/4\, NE\1/4\ Section 
4; NE\1/4\ SW\1/4\, SE\1/4\, S\1/2\ NE\1/4\ Section 7; S\1/2\ 
Section 8; Section 9 except N\1/2\ NW\1/4\; Sections 10-16; N\1/2\, 
N\1/2\ SE\1/4\ Section 17; SW\1/4\ SW\1/4\, NE\1/4\ NE\1/4\ Section 
18; Section 19; Section 20 except NE\1/4\ NE\1/4\; Section 21 except 
NW\1/4\ NW\1/4\; Sections 22-36.
    T.37N., R.09E. Willamette Meridian: Sections 1-10; N\1/2\ N\1/
2\, SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 11; 
NE\1/4\ NE\1/4\ Section 12; N\1/2\ NW\1/4\, W\1/2\ SW\1/4\ Section 
14; Sections 15-22; W\1/2\ W\1/2\, SE\1/4\ SW\1/4\ Section 23; SW\1/
4\ SW\1/4\ Section 25; W\1/2\, SE\1/4\ Section 26; Sections 27-29; 
Section 30 except SW\1/4\ SW\1/4\; Section 31 except NW\1/4\ NW\1/
4\, S\1/2\ NW\1/4\, SW\1/4\ SW\1/4\; Sections 32-35; W\1/2\ Section 
36.
    T.37N., R.10E. Willamette Meridian: Section 6; N\1/2\ NW\1/4\, 
NW\1/4\ NE\1/4\ Section 7.
    T.38N., R.08E. Willamette Meridian: E\1/2\ SE\1/4\ Section 23; 
S\1/2\, S\1/2\ NE\1/4\ Section 24; Section 25; E\1/2\, E\1/2\ SW\1/
4\ Section 26; S\1/2\ SW\1/4\ Section 33; S\1/2\ S\1/2\ Section 34; 
Section 35 except W\1/2\ NW\1/4\; Section 36.
    T.38N., R.09E. Willamette Meridian: Sections 13-15; Section 16 
except W\1/2\ NW\1/4\; S\1/2\ SE\1/4\ Section 17; Section 19 except 
N\1/2\ N\1/2\; Section 20 except N\1/2\ NW\1/4\; Sections 21-31; 
Section 32 except NW\1/4\; Sections 33-36.
    T.38N., R.10E. Willamette Meridian: Section 18 except N\1/2\ 
NE\1/4\; Section 19; Sections 30-31.
[GRAPHIC] [TIFF OMITTED] TR24MY96.024

    Map and description of WA-07-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Flattery, Mt Baker and Sauk River, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.34N, R.12E. Willamette Meridian: Sections 1-3; NE\1/4\ NW\1/
4\, N\1/2\ NE\1/4\ Section 10; N\1/2\ N\1/2\ Section 11; N\1/2\ 
NW\1/4\, NW\1/4\ NE\1/4\ Section 12.
    T.34N, R.13E. Willamette Meridian: W\1/2\ Section 4; Sections 5-
6; N\1/2\ NW\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\ 
Section 8; NW\1/4\, W\1/2\ NE\1/4\ Section 9.
    T.35N, R.11E. Willamette Meridian: N\1/2\, N\1/2\ SE\1/4\ 
Section 1; N\1/2\, NW\1/4\ SW\1/4\ Section 2; N\1/2\, N\1/2\ SW\1/
4\, SW\1/4\ SW\1/4\ Section 3; Section 4.
    T.35N, R.12E. Willamette Meridian: S\1/2\ SW\1/4\, NW\1/4\ SW\1/
4\ Section 5; W\1/2\, SE\1/4\, S\1/2\ NE\1/4\ Section 6; Sections 7-
8; Section 9 except NE\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ NW\1/4\; SW\1/
4\ SW\1/4\ Section 10; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 13; 
Section 14 except S\1/2\ SE\1/4\; Sections 15-18; Section 19 except 
SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\; Sections 20-22; NW\1/4\, N\1/2\ 
SW\1/4\, SW\1/4\ SW\1/4\ Section 23; S\1/2\, S\1/2\ N\1/2\ Section 
25; S\1/2\, S\1/2\ N\1/2\, NW\1/4\ NW\1/4\ Section 26; Sections 27-
29; NE\1/4\, E\1/2\ SE\1/4\ Section 30; NE\1/4\ NW\1/4\ Section 31; 
Sections 32-36.
    T.35N, R.13E. Willamette Meridian: SW
FR Doc. 96-12647 Endangered and Threatened Wildlife and Plants; Final Designation of Critical Habitat for the Marbled Murrelet
\1/4\, SW\1/4\ SE\1/4\ 
Section 30; Section 31 except NE\1/4\ NE\1/4\; SW\1/4\, S\1/2\ SE\1/
4\ Section 32; S\1/2\ SW\1/4\ Section 33.
    T.36N, R.11E. Willamette Meridian: SE\1/4\ SW\1/4\, SE\1/4\ 
Section 23; SW\1/4\ SW\1/4\ Section 24; W\1/2\ Section 25; Section 
26; Section 27 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\; E\1/2\ SE\1/
4\ Section 28; Sections 33-35; Section 36 except E\1/2\ NE\1/4\.

[[Page 26290]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.025

    Map and description of WA-08-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Bellingham, Mt. Baker and Sauk River, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.32N., R.08E. Willamette Meridian: N\1/2\ Section 1; N\1/2\ 
Section 3; NW\1/4\ NW\1/4\, S\1/2\ NW\1/4\, NE\1/4\ Section 4; N\1/
2\ Section 5; N\1/2\ Section 6.
    T.33N., R.08E. Willamette Meridian: Sections 1-30; Section 31 
except S\1/2\ SE\1/4\; Section 32; Section 33 except S\1/2\ SE\1/4\; 
Section 34 except SE\1/4\ SW\1/4\; Section 35; Section 36 except 
N\1/2\ SE\1/4\, SE\1/4\ NE\1/4\.
    T.33N., R.09E. Willamette Meridian: W\1/2\, W\1/2\ E\1/2\ 
Section 2; Section 3 except S\1/2\ SW\1/4\; Sections 4-8; Section 9 
except E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; E\1/2\ E\1/2\, NW\1/4\ NE\1/
4\ Section 10; W\1/2\, NW\1/4\ SE\1/4\, W\1/2\ NE\1/4\ Section 11; 
NW\1/4\ NW\1/4\ Section 14; NE\1/4\ NE\1/4\ Section 15; W\1/2\ 
Section 16; Sections 17-20; Section 21 except NE\1/4\; S\1/2\ SW\1/
4\ Section 22; N\1/2\ NW\1/4\ Section 29; NW\1/4\, W\1/2\ SW\1/4\, 
N\1/2\ NE\1/4\ Section 30.
    T.34N., R.07E. Willamette Meridian: Sections 1-6; Section 7 
except N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\; Section 8 except SW\1/4\ 
SW\1/4\; Sections 9-15; Section 16 except W\1/2\ E\1/2\; Sections 
17-21; Section 22 except SW\1/4\; Sections 23-26; S\1/2\ Section 27; 
Sections 28-29; N\1/2\ NW\1/4\, S\1/2\, NW\1/4\ NE\1/4\ Section 32; 
Section 33; Section 34 except SW\1/4\ NE\1/4\.
    T.34N., R.08E. Willamette Meridian: Sections 2-11; Section 12 
except N\1/2\ NW1/4; Sections 13-28; Section 29 except S\1/2\ NW\1/
4\, N\1/2\ SW\1/4\; Section 30 except SE\1/4\ NW\1/4\, N\1/2\ SW\1/
4\, SW\1/4\ NE\1/4\; Sections 31-36.
    T.34N., R.09E. Willamette Meridian: Sections 19-22; Sections 27-
34.
    T.35N., R.07E. Willamette Meridian: S\1/2\ SW\1/4\, NE\1/4\ 
SW\1/4\ Section 27; S\1/2\ Section 28; Section 29 except NW\1/4\ 
NW\1/4\, NE\1/4\; SE\1/4\ SW\1/4\, SE\1/4\ Section 30; Sections 31-
34; S\1/2\ Section 35.
[GRAPHIC] [TIFF OMITTED] TR24MY96.026

    Map and description of WA-08-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Sauk River, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.33N., R.10E. Willamette Meridian: Section 1.
    T.33N., R.11E. Willamette Meridian: Section 5 except E\1/2\ 
SE\1/4\; Section 6.
    T.34N., R.10E. Willamette Meridian: SE\1/4\ NW\1/4\, NE\1/4\ 
SW\1/4\, E\1/2\ Section 10; Sections 11-14; NW\1/4\ NE\1/4\, E\1/2\ 
E\1/2\ Section 15; E\1/2\ SE\1/4\ Section 21; Section 22 except 
NW\1/4\, NW\1/4\ NE\1/4\; Sections 23-27; NW\1/4\ NE\1/4\, E\1/2\ 
E\1/2\ Section 28; NE\1/4\ SE\1/4\, E\1/2\ NE\1/4\ Section 33; 
Sections 34-36.
    T.34N., R.11E. Willamette Meridian: Section 5 except N\1/2\ 
NE\1/4\, NE\1/4\ NW\1/4\; Sections 6-8; W\1/2\ SW\1/4\ Section 9; 
S\1/2\ SE\1/4\, SE\1/4\ SW\1/4\ Section 10; SW\1/4\ SW\1/4\ Section 
11; W\1/2\ W\1/2\ Section 14; Section 15 except NW\1/4\ NW\1/4\; 
Section 16 except N\1/2\ NE\1/4\; Sections 17-22; W\1/2\ W\1/2\ 
Section 23; W\1/2\ W\1/2\ Sections 26-27 except W\1/2\ SW\1/4\; N\1/
2\ Section 28; W\1/2\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\, W\1/2\ SE\1/
4\ Section 29; Sections 30-31; Section 32 except NE\1/4\ NE\1/4\; 
NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 34; NW\1/4\ NW\1/4\ Section 
35.
[GRAPHIC] [TIFF OMITTED] TR24MY96.027

    Map and description of WA-09-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Sauk River, Washington; 1995.
    Critical Habitat includes only Federal lands described within the 
following areas:

    T.31N., R.07E. Willamette Meridian: W\1/2\, W\1/2\ NE\1/4\ 
Section 5; E\1/2\ E\1/2\ Section 6; SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\ Section 7; W\1/2\ Section 8; W\1/2\ Section 17; E\1/2\ E\1/
2\ Section 18.
    T.32N., R.07E. Willamette Meridian: SW\1/4\, SW\1/4\ SE\1/4\ 
Section 32.
[GRAPHIC] [TIFF OMITTED] TR24MY96.028

    Map and description of WA-09-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Sauk River, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.29N., R.09E. Willamette Meridian: Section 1; N\1/2\ Section 2; 
Sections 3-6; N\1/2\ Section 7; N\1/2\ Section 8; N\1/2\ Section 9; 
NW\1/4\ Section 10.
    T.29N., R.10E. Willamette Meridian: Sections 1-3; W\1/2\ Section 
6; Sections 11-13.
    T.29N., R.11E. Willamette Meridian: W\1/2\ NW\1/4\ Section 2; 
NE\1/4\, NE\1/4\ NW\1/4\ Section 3; NW\1/4\ NW\1/4\ Section 5; 
Sections 6-7; W\1/2\ NW\1/4\, SW\1/4\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/
4\ Section 17; Section 18; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\, 
N\1/2\ SE\1/4\ Section 19; N\1/2\, N\1/2\ SW\1/4\, NW\1/4\ SE\1/4\ 
Section 20.
    T.30N., R.08E. Willamette Meridian: Sections 1-3; N\1/2\ Section 
4; N\1/2\ Section 5; N\1/2\, SE\1/4\ Section 11; Sections 12-13; 
E\1/2\ Section 14; SW\1/4\ Section 15; Sections 16-17; Section 18 
except S\1/2\ NW\1/4\, N\1/2\ SW\1/4\; Sections 19-26; N\1/2\ 
Section 27; N\1/2\ Section 28; N\1/2\, SE\1/4\ Section 35.
    T.30N., R.09E. Willamette Meridian: NW\1/4\, SE\1/4\, N\1/2\ 
NE\1/4\, SW\1/4\ NE\1/4\ Section 1; E\1/2\ NE\1/4\ Section 2; W\1/
2\, SW\1/4\ SE\1/4\, N\1/2\ NE\1/4\ Section 6; Section 7; S\1/2\ 
NW\1/4\, S\1/2\, SW\1/4\ NE\1/4\ Section 8; S\1/2\ SE\1/4\ Section 
9; S\1/2\ SW\1/4\ Section 10; E\1/2\ NW\1/4\, NE\1/4\ Section 12; 
S\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 14; Section 15; 
Section 16 except NW\1/4\ NW\1/4\; SE\1/4\, S\1/2\ NE\1/4\ Section 
17; W\1/2\ Section 18; Section 19 except W\1/2\ NE\1/4\; Section 20 
except NE\1/4\ NW\1/4\, SW\1/4\; Sections 21-22; Section 23 except 
NE\1/4\ NE\1/4\; S\1/2\ NW\1/4\, S\1/2\, SE\1/4\ NE\1/4\ Section 24; 
Sections 25-36.
    T.30N., R.10E. Willamette Meridian: Sections 1-6; N\1/2\, NE\1/
4\ SE\1/4\ Section 7; Sections 8-17; E\1/2\ Section 18; Sections 19-

[[Page 26291]]

28; N\1/2\, N\1/2\ SE\1/4\ Section 29; Section 30 except SE\1/4\ 
SE\1/4\; Section 31 except N\1/2\ NE\1/4\; SW\1/4\ NW\1/4\, NW\1/4\ 
SW\1/4\ Section 32; NE\1/4\, E\1/2\ NW\1/4\, N\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\ Section 33; Sections 34-36.
    T.30N., R.11E. Willamette Meridian: SW\1/4\ SE\1/4\, S\1/2\ 
NW\1/4\, SW\1/4\ Section 5; Sections 6-8; SW\1/4\ NW\1/4\, NE\1/4\ 
SW\1/4\, SE\1/4\ Section 9; Section 10 except N\1/2\ NW\1/4\, SW\1/
4\ NW\1/4\, NW\1/4\ NE\1/4\; Section 15 except SE\1/4\ SE\1/4\; 
Sections 16-22; NW\1/4\ NW\1/4\ Section 27; Section 28 except E\1/2\ 
SE\1/4\, SE\1/4\ NE\1/4\; Sections 29-31; Section 32 except SE\1/4\; 
Section 33 except SW\1/4\ SW\1/4\; Section 34 except NE\1/4\, N\1/2\ 
NW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ SE\1/4\.
    T.31N., R.07E. Willamette Meridian: S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 1; Sections 12-13.
    T.31N., R.08E. Willamette Meridian: W\1/2\ SW\1/4\ Section 3; 
S\1/2\ Section 4; S\1/2\ Section 5; SE\1/4\ SE\1/4\ Section 6; 
Section 7; Section 8 except S\1/2\ SE\1/4\; N\1/2\, NW\1/4\ SW\1/4\ 
Section 9; W\1/2\ NW\1/4\ Section 10; W\1/2\, W\1/2\ SE\1/4\ Section 
17; Sections 18-21; Section 22 except NE\1/4\ NE\1/4\; S\1/2\ NW\1/
4\, SW\1/4\, W\1/2\ SE\1/4\ Section 23; Section 25 except N\1/2\ 
NE\1/4\, SE\1/4\ NE\1/4\; Sections 26-36.
    T.31N., R.09E. Willamette Meridian: Section 1; E\1/2\ E\1/2\, 
NW\1/4\ NE\1/4\ Section 2; E\1/2\, E\1/2\ SW\1/4\ Section 3; E\1/2\ 
NW\1/4\, NE\1/4\ SW\1/4\, W\1/2\ NE\1/4\ Section 10; NE\1/4\ NW\1/
4\, SE\1/4\ SW\1/4\, E\1/2\ Section 12; Section 13 except W\1/2\ 
NW\1/4\; Section 23 except N\1/2\ NW\1/4\; Sections 24-26; S\1/2\ 
Section 27; N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, S\1/2\ NE\1/4\ Section 
28; W\1/2\, SW\1/4\ SE\1/4\ Section 31; N\1/2\ NW\1/4\, E\1/2\ 
Section 35; Section 36.
    T.31N., R.10E. Willamette Meridian: Section 6 except E\1/2\ E\1/
2\; Sections 7-8; W\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 9; 
SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\ Section 10; Section 15 except E\1/
2\ E\1/2\; NW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 16; 
Sections 17-21; Section 22 except E\1/2\ NE\1/2\; SW\1/4\ SW\1/4\ 
Section 23; SW\1/4\, S\1/2\ SE\1/4\, SW\1/4\ NW\1/4\ Section 25; 
Section 26 except NE\1/4\ NE\1/4\; Sections 27-36.
    T.31N., R.11E. Willamette Meridian: W\1/2\ NW\1/4\, SW\1/4\ 
Section 31.
    T.32N., R.08E. Willamette Meridian: SW\1/4\ Section 14; S\1/2\ 
Section 15; E\1/2\ NE\1/4\ Section 21; N\1/2\, N\1/2\ SW\1/4\, SE\1/
4\ Section 22; Section 23 except NE\1/4\ NE\1/4\; W\1/2\ SW\1/4\, 
NW\1/4\ SE\1/4\, SW\1/4\ NE\1/4\ Section 24; W\1/2\ NW\1/4\ Section 
25; N\1/2\ N\1/2\ Section 26.
    T.32N., R.09E. Willamette Meridian: S\1/2\ Section 26; N\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\, SE\1/4\ Section 27; N\1/2\ SE\1/4\ Section 
28; E\1/2\ Section 34; E\1/2\, N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, 
NE\1/4\ SW\1/4\ Section 35; Section 36 except NE\1/4\, NE\1/4\ SE\1/
4\.
    T.32N., R.10E. Willamette Meridian: Section 31 except E\1/2\ 
E\1/2\, NW\1/4\ NE\1/4\, NE\1/4\ NW\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.029

    Map and description of WA-09-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Sauk River and Skykomish River, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.27N., R.09E. Willamette Meridian: E\1/2\ NW\1/4\, NE\1/4\ 
Section 1.
    T.27N., R.10E. Willamette Meridian: N\1/2\ N\1/2\ Section 6.
    T.28N., R.09E. Willamette Meridian: S\1/2\ S\1/2\ Section 23; 
S\1/2\ SW\1/4\ Section 24; Section 25; Section 26 except N\1/2\, 
SW\1/4\ SW\1/4\; SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, 
NE\1/4\ NE\1/4\ Section 36.
    T.28N., R.10E. Willamette Meridian: S\1/2\ Section 19; Section 
20 except NW\1/4\ NW\1/4\; SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\ Section 
21; SE\1/4\ SE\1/4\ Section 23; S\1/2\ SW\1/4\ Section 24; NW\1/4\, 
N\1/2\ SW\1/4\, W\1/2\ NE\1/4\ Section 25; S\1/2\ NW\1/4\, SW\1/4\, 
W\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ Section 26; S\1/2\ Section 
27; NW\1/4\, NW\1/4\ NE\1/4\ Section 29; N\1/2\, SW\1/4\ Section 30; 
Section 31 except SW\1/4\ NW\1/4\; Section 32 except E\1/2\ E\1/2\.
    T.29N., R.08E. Willamette Meridian: SE\1/4\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 22; NE\1/4\ SE\1/4\ Section 25; NW\1/4\, N\1/2\ 
NE\1/4\ Section 27; E\1/2\ NE\1/4\ Section 28.
    T.29N., R.09E. Willamette Meridian: Section 30 except N\1/2\ 
N\1/2\.

    Critical Habitat includes only State or County lands described 
within the following areas:

    T.27N., R.09E. Willamette Meridian: NW\1/4\ NW\1/4\, SW\1/4\ 
Section 2; N\1/2\, NE\1/4\ SW\1/4\, SE\1/4\ Section 3; NE\1/4\ NE\1/
4\ Section 4; N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 10; NW\1/4\, 
S\1/2\ SW\1/4\, SE\1/4\, S\1/2\ NE\1/4\ Section 11; Section 12; 
Section 13 except SE\1/4\ SE\1/4\; N\1/2\ NW\1/4\, N\1/2\ SE\1/4\, 
NE\1/4\ Section 14.
    T.27N., R.10E. Willamette Meridian: Section 7; S\1/2\ Section 8; 
Section 9 except N\1/2\ NW\1/4\; NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ 
SW\1/4\ Section 10; N\1/2\ NW\1/4\ Section 16; N\1/2\, NW\1/4\ SW\1/
4\ Section 17; Section 18 except W\1/2\ SW\1/4\, SE\1/4\ SE\1/4\.
    T.28N., R.08E. Willamette Meridian: Sections 1-2; Section 3 
except N\1/2\ NW\1/4\; Sections 4-5; W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ 
Section 6; Section 7; E\1/2\ SE\1/4\, NE\1/4\ Section 8; SE\1/4\ 
SW\1/4\, E\1/2\ E\1/2\, SW\1/4\ SE\1/4\, NW\1/4\ NE\1/4\ Section 9; 
Sections 10-12; N\1/2\ N\1/2\, NW\1/4\ SE\1/4\, S\1/2\ NE\1/4\ 
Section 13; N\1/2\ Section 14; Section 15; S\1/2\ S\1/2\, E\1/2\ 
NE\1/4\, NE\1/4\ SE\1/4\ Section 16; Section 17 except NW\1/4\ SW\1/
4\, NW\1/4\; Section 18 except SW\1/4\; W\1/2\ Section 20; N\1/2\ 
NW\1/4\ Section 21; NE\1/4\ NW\1/4\, NE\1/4\ Section 36.
    T.28N., R.09E. Willamette Meridian: Sections 1-4; S\1/2\ Section 
5; N\1/2\, SW\1/4\ Section 6; W\1/2\, W\1/2\ E\1/2\ Section 7; NE\1/
4\ Section 8; Sections 9-11; Section 12 except S\1/2\ SE\1/4\; S\1/
2\ S\1/2\, NE\1/4\ SE\1/4\ Section 13; Sections 14-16; N1/2 NW\1/4\, 
SE\1/4\ NW\1/4\, E\1/2\ Section 17; SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\ Section 20; Section 21; Section 27; Section 28 except E\1/2\ 
SW\1/4\; Section 29 except NW\1/4\; N\1/2\ NW\1/4\, N\1/2\ SE\1/4\, 
NE\1/4\ Section 31; N\1/2\ N\1/2\, S\1/2\ NW\1/4\ Section 32; N\1/2\ 
NW\1/4\, S\1/2\ Section 33; Section 34 except NE\1/4\ SE\1/4\; SW\1/
4\ Section 35.
    T.28N., R.10E. Willamette Meridian: W\1/2\ Section 2; Section 3; 
Section 4 except N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\; Sections 5-6; 
NW\1/4\ Section 7.
    T.29N., R.08E. Willamette Meridian: Sections 1-21; Section 22 
except SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\; Section 23 except SW\1/4\ 
SW\1/4\; Section 24; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\, S\1/
2\ S\1/2\ Section 25; SW\1/4\ NW\1/4\, SW\1/4\, S\1/2\ SE\1/4\, N\1/
2\ NE\1/4\ Section 26; Section 27 except NW\1/4\, N\1/2\ NE\1/4\; 
N\1/2\ NW\1/4\, SE\1/4\ Section 28; Sections 29-30; Sections 32-34; 
Section 35 except S\1/2\ SW\1/4\; Section 36.
    T.29N., R.09E. Willamette Meridian: S\1/2\ Section 2; S\1/2\ 
Section 7; S\1/2\ Section 8; S\1/2\ Section 9; S\1/2\, NE\1/4\ 
Section 10; Sections 11-12; W\1/2\ NW\1/4\, SE\1/4\ SW\1/4\, SE\1/
4\, E\1/2\ NE\1/4\ Section 13; Sections 14-19; Section 20 except 
S\1/2\ SW\1/4\; Section 21; Section 22 except S\1/2\ S\1/2\; Section 
23 except S\1/2\ S\1/2\; NE\1/4\ Section 24; Section 25; Section 26 
except NW\1/4\, N\1/2\ NE\1/4\; SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\ 
Section 27; S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 29; N\1/2\ N\1/
2\ Section 30; W\1/2\, NW\1/4\ SE\1/4\, W\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\ Section 31; Section 32 except W\1/2\ NW\1/4\, NW\1/4\ SW\1/
4\; Section 33 except NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\; Section 34 
except SW\1/4\ NW\1/4\, SW\1/4\ SE\1/4\; Sections 35-36.
    T.29N., R.10E. Willamette Meridian: Section 4 except W\1/2\ 
SW\1/4\; SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 6; 
Sections 7-8; S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 9; Section 10 
except SE\1/4\ SW\1/4\; Section 14; Section 15 except N\1/2\ NW\1/
4\, NW\1/4\ NE\1/4\; Sections 16-24; Section 25 except SE\1/4\ SE\1/
4\; Section 26 except NW\1/4\ SW\1/4\; Sections 28-33; SW\1/4\ NW\1/
4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\ Section 34; 
Section 36.
    T.30N., R.10E. Willamette Meridian: S\1/2\ Section 27; S\1/2\ 
Section 28; Sections 29-34; SW\1/4\ Section 35; Section 36.

[[Page 26292]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.030

    Map and description of WA-09-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Sauk River, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.29N., R.12E. Willamette Meridian: SW\1/4\ Section 3; Section 4 
except N\1/2\ NE\1/4\; Section 5; Sections 8-10; SW\1/4\, SW\1/4\ 
SE\1/4\ Section 11; Section 13 except E\1/2\, SE\1/4\ SW\1/4\; 
Sections 14-17; NE\1/4\ SE\1/4\ Section 18; NE\1/4\ Section 20; N\1/
2\, N\1/2\ N\1/2\ Section 21; N\1/2\, N\1/2\ SW\1/4\ Section 22; 
N\1/2\ Section 23; NW\1/4\ NW\1/4\ Section 24.
    T.30N., R.11E. Willamette Meridian: S\1/2\ SW\1/4\, SE\1/4\ 
Section 1; S\1/2\ S\1/2\ Section 2; Sections 11-12; N\1/2\ Section 
13; N\1/2\ Section 14.
    T.30N., R.12E. Willamette Meridian: S\1/2\ Section 6; Section 7; 
SW\1/4\ NW\1/4\, SW\1/4\, SW\1/4\ SE\1/4\ Section 8; SW\1/4\ NW\1/
4\, SW\1/4\ Section 16; Sections 17-18; N\1/2\ NW\1/4\, E\1/2\, 
SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\ Section 19; Section 20; NW\1/4\, 
NW\1/4\ SW\1/4\, W\1/2\ NE\1/4\ Section 21; Section 29 except E\1/2\ 
NE\1/4\; N\1/2\ NW\1/4\, E\1/2\ SW\1/4\, E\1/2\ Section 32; W\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\ Section 33.
[GRAPHIC] [TIFF OMITTED] TR24MY96.031

    Map and description of WA-09-e taken from United States Fish and 
Wildlife Service 1:100,000 map; Sauk River, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.31N., R.11E. Willamette Meridian: N\1/2\ Section 1; N\1/2\ 
NW\1/4\, SW\1/4\ NW\1/4\, SW\1/4\, N\1/2\ NE\1/4\ Section 2; Section 
3; Section 4 except SE\1/4\ SE\1/4\; E\1/2\ NW\1/4\, E\1/2\ Section 
5; N\1/2\ NW\1/4\, W\1/2\ NE\1/4\ Section 9; E\1/2\ NW\1/4\, E\1/2\ 
Section 10; W\1/2\, W\1/2\ SE\1/4\ Section 11; W\1/2\, W\1/2\ NE\1/
4\, SE\1/4\ Section 14; E\1/2\ SW\1/4\, E\1/2\ Section 15; E\1/2\ 
NW\1/4\, NE\1/4\ Section 22; N\1/2\ N\1/2\ Section 23.
    T.31N., R.12E. Willamette Meridian: N\1/2\ NE\1/4\ Section 4; 
NW\1/4\, W\1/2\ NE\1/4\ Section 5; N\1/2\, N\1/2\ SE\1/4\ Section 6.
    T.32N., R.10E. Willamette Meridian: Sections 1-3; Sections 10-
14; N\1/2\ N\1/2\, SE\1/4\ NE\1/4\ Section 15; Sections 23-25; N\1/
2\, SE\1/4\ Section 26; N\1/2\ NE\1/4\ Section 36.
    T.32N., R.11E. Willamette Meridian: NW\1/4\ NW\1/4\ Section 1; 
Section 2; E\1/2\ W\1/2\, E\1/2\ Section 3; Sections 5-8; W\1/2\ 
NW\1/4\, S\1/2\ Section 9; Section 10 except NW\1/4\ NW\1/4\; 
Section 11; W\1/2\ NW\1/4\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\ Section 
12; Sections 13-30; N\1/2\, NE\1/4\ SW\1/4\, SE\1/4\ Section 31; 
Section 32-36.
    T.32N., R.12E. Willamette Meridian: S\1/2\ S\1/2\, NE\1/4\ SE\1/
4\ Section 7; S\1/2\, S\1/2\ NE\1/4\ Section 8; Section 9 except 
N\1/2\ N\1/2\; SW\1/4\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ Section 10; 
S\1/2\ SW\1/4\ Section 13; W\1/2\, S\1/2\ SE\1/4\ Section 14; 
Sections 15-16; Section 17 except SE\1/4\ SE\1/4\; Sections 18-19; 
Section 20 except NE\1/4\ NE\1/4\; Sections 21-23; Section 24 except 
NE\1/4\ NE\1/4\; NW\1/4\, NW\1/4\ SW\1/4\, NW\1/4\ NE\1/4\ Section 
25; Sections 26-33; N\1/2\, W\1/2\ SW\1/4\, NE\1/4\ SW\1/4\ Section 
34; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 35.
    T.33N., R.11E. Willamette Meridian: S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 15; E\1/2\ SW\1/4\, SE\1/4\ Section 16; Sections 21-
22; S\1/2\ NW\1/4\, SW\1/4\, NW\1/4\ SE\1/4\, SW\1/4\ NE\1/4\ 
Section 23; W\1/2\, W\1/2\ E\1/2\ Section 25; Section 26 except 
NE\1/4\ NE\1/4\; Section 27; E\1/2\ NW\1/4\, E\1/2\ SE\1/4\, NE\1/4\ 
Section 28; Section 34 except W\1/2\ SW\1/4\; Section 35; NW\1/4\, 
W\1/2\ SW\1/4\ Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.032

    Map and description of WA-10-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Skykomish River, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.26N., R.10E. Willamette Meridian: W\1/2\ W\1/2\ Section 4; 
NW\1/4\ NW\1/4\, E\1/2\ NW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 5; 
Section 7 except NE\1/4\ NE\1/4\; S\1/2\ SW\1/4\, SE\1/4\ Section 8; 
Section 9 except N\1/2\ N\1/2\; W\1/2\ W\1/2\, SE\1/4\ SW\1/4\, S\1/
2\ SE\1/4\ Section 10; S\1/2\ SW\1/4\ Section 11; S\1/2\ Section 13; 
Section 14 except N\1/2\ NE\1/4\; Sections 15-19; N\1/2\ NW\1/4\, 
E\1/2\ Section 20; Sections 21-23; Section 24 except E\1/2\ NW\1/4\, 
NW\1/4\ SW\1/4\, NW\1/4\ NE\1/4\; N\1/2\ N\1/2\ Section 25; N\1/2\ 
N\1/2\ Section 26; N\1/2\ Section 27; N\1/2\ Section 28; N\1/2\ 
NE\1/4\ Section 29; W\1/2\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 
30.
    T.26N., R.11E. Willamette Meridian: Section 2; Sections 4-7; 
NW\1/4\, W\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, NW\1/4\ NE\1/4\ Section 8; 
NW\1/4\, N\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, N\1/2\ NE\1/4\ Section 18; 
E\1/2\ Section 19; SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\ Section 20; NW\1/
4\ NW\1/4\ Section 29; N\1/2\ N\1/2\ Section 30.
    T.27N., R.09E. Willamette Meridian: S\1/2\ SE\1/4\ Section 19; 
Section 30 except NW\1/4\ NW\1/4\; Section 31; W\1/2\, NW\1/4\ SE\1/
4\, W\1/2\ NE\1/4\ Section 32.
    T.27N., R.10E. Willamette Meridian: Section 1 except NW\1/4\ NW 
\1/4\; E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\ Section 2; E\1/2\, E\1/2\ 
SW\1/4\ Section 11; Sections 12-13; Section 14 except SW\1/4\; E\1/
2\ SE\1/4\ Section 15; NE\1/4\ NE\1/4\ Section 22; N\1/2\, N\1/2\ 
SW\1/4\, SE\1/4\ Section 23; Section 24; N\1/2\ N\1/2\, SE\1/4\ 
NE\1/4\ Section 25; SW\1/4\ SW\1/4\, E\1/2\ SW\1/4\, E\1/2\ Section 
26; E\1/2\ NW\1/4\, NE\1/4\ SW\1/4\, E\1/2\ Section 31; Section 32; 
Sections 35-36.
    T.27N., R.11E. Willamette Meridian: Sections 1-20; W\1/2\ NW\1/4\, 
N\1/2\ SW\1/4\, SE\1/4\ Section 21; Sections 22-36.
    T.27N., R.12E. Willamette Meridian: SW\1/4\ SW\1/4\ Section 2; 
Section 3 except N\1/2\ NE\1/4\; Sections 4-10; W\1/2\ W\1/2\, NW\1/
4\ SW\1/4\ Section 11; N\1/2\ N\1/2\ Section 15; N\1/2\, W\1/2\ 
SW\1/4\, NE\1/4\ SW\1/4\, NW\1/4\ SE\1/4\ Section 16; Sections 17-
19; W\1/2\ Section 20; W\1/2\ Section 29; Sections 30-31; NW\1/4\, 
N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ Section 32.
    T.28N., R.10E. Willamette Meridian: SW\1/4\ SE\1/4\, E\1/2\ 
SE\1/4\ Section 36.
    T.28N., R.11E. Willamette Meridian: S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 10; E\1/2\ SW\1/4\, SE\1/4\ Section 12; Section 13 
except W\1/2\ W\1/2\; Section 15 except NE\1/4\ NE\1/4\; Section 16; 
S\1/2\, SE\1/4\ NW\1/4\, S\1/2\ NE\1/4\ Section 17; E\1/2\ SE\1/4\ 
Section 18; E\1/2\ E\1/2\, SW\1/4\ SE\1/4\ Section 19; Sections 20-
29; E\1/2\ Section 30; Section 31 except NW\1/4\ NW\1/4\; Sections 
32-36.
    T.28N., R.12E. Willamette Meridian: S\1/2\ NW\1/4\, SW\1/4\, 
SW\1/4\ SE\1/4\ Section 3; SW\1/4\ SE\1/4\, E\1/2\ SE\1/4\ Section 
4; Section 7 except N\1/2\ N\1/2\; SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\ Section 8; Section 9 except NW\1/4\ NW\1/4\; Section 10; 
SW\1/4\ SW\1/4\ Section 11; W\1/2\, W\1/2\ SE\1/4\ Section 14; 
Sections 15-23; SW\1/4\ NW\1/4\ Section 25; N\1/2\ Section 26; N\1/
2\ Section 27; W\1/2\, NE\1/4\, SW\1/4\ SE\1/4\ Section 28; Sections 
29-32; W\1/2\, W\1/2\ E\1/2\ Section 33.

[[Page 26293]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.033

    Map and description of WA-10-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Skykomish River, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.25N., R.10E. Willamette Meridian: Sections 3-5; S\1/2\, SE\1/
4\ NE\1/4\ Section 6; Sections 7-8; W\1/2\, W\1/2\ SE\1/4\ Section 
9; NE\1/4\ Section 10; W\1/2\, S\1/2\ SE\1/4\ Section 16; Section 
17; N\1/2\, SE\1/4\, NE\1/4\ SW\1/4\ Section 18; NE\1/4\ Section 20; 
N\1/2\, N\1/2\ SE\1/4\ Section 21; W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, 
S\1/2\ Section 22; SW\1/4\ SW\1/4\ Section 23; W\1/2\ SW\1/4\, SE\1/
4\ SW\1/4\ Section 25; NW\1/4\, N\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, 
SE\1/4\, S\1/2\ NE\1/4\, NW\1/4\ NE\1/4\ Section 26; NE\1/4\ NW\1/
4\, N\1/2\ SE\1/4\, NE\1/4\ Section 27.
    T.25N., R.11E. Willamette Meridian: Sections 1-4; Sections 9-12; 
N\1/2\, N\1/2\ S\1/2\ Section 13; N\1/2\, N\1/2\ S\1/2\ Section 14; 
Section 15; N\1/2\, SW\1/4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 
16; SE\1/4\, SE\1/4\ SW\1/4\ Section 17; SE\1/4\, S\1/2\ NE\1/4\ 
Section 19; NW\1/4\, NW\1/4\ SW\1/4\, N\1/2\ NE\1/4\ Section 20; 
Section 22 except SW\1/4\ SW\1/4\; W\1/2\ W\1/2\ Section 23; NE\1/4\ 
SW\1/4\, NE\1/4\ SE\1/4\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 
27.
    T.25N., R.12E. Willamette Meridian: Sections 1-5; W\1/2\ Section 
6; Section 7; Section 8 except NE\1/4\ NW\1/4\; Sections 9-13; N\1/
2\ NW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 14; Sections 16-20; 
NW\1/4\, W\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, W\1/2\ NE\1/4\, NE\1/4\ 
NE\1/4\ Section 21; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 28; N\1/
2\, N\1/2\ S\1/2\ Section 29; NE\1/4\ SE\1/4\, NE\1/4\ Section 30.
    T.25N., R.13E. Willamette Meridian: W\1/2\ W\1/2\ Section 6; 
W\1/2\ Section 7; W\1/2\, W\1/2\ SE\1/4\, SW\1/4\ NE\1/4\ Section 
18; W\1/2\ Section 19.
    T.26N., R.11E. Willamette Meridian: S\1/2\ SW\1/4\ Section 27; 
SE\1/4\ SE\1/4\ Section 28; S\1/2\ SW\1/4\, E\1/2\ Section 32; N\1/
2\ SW\1/4\, NE\1/4\ Section 33; Sections 34-35; S\1/2\ Section 36.
    T.26N., R.12E. Willamette Meridian: Section 1; NW\1/4\, E\1/2\ 
Section 2; N\1/2\ NE\1/4\ Section 3; E\1/2\ E\1/2\ Section 11; 
Sections 12-13; E\1/2\ E\1/2\, NW\1/4\ SE\1/4\ Section 24; N\1/2\, 
N\1/2\ S\1/2\ Section 25; S\1/2\ NE\1/4\ Section 34; Sections 35-36
    T.26N., R.13E. Willamette Meridian: S\1/2\ S\1/2\, NE\1/4\ SE\1/
4\ Section 6; Section 8; S\1/2\ Section 10; Sections 18-19; W\1/2\ 
W\1/2\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\, E\1/2\ SE\1/4\ Section 20; 
S\1/2\, SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\ Section 21; W\1/2\ SW\1/4\ 
Section 22; W\1/2\ Section 27; Section 28 except SW\1/4\ SE\1/4\; 
N\1/2\, NW\1/4\ SW\1/4\, S\1/2\ S\1/2\ Section 29; N\1/2\, SW\1/4\ 
Section 30; E\1/2\ NE\1/4\, NW\1/4\ NE\1/4\, NE\1/4\ SE\1/4\ Section 
31; N\1/2\, N\1/2\ SW\1/4\ Section 32.
    T.27N., R.12E. Willamette Meridian: S\1/2\ S\1/2\ Section 13; 
NE\1/4\ SW\1/4\, S\1/2\ SW\1/4\, SE\1/4\ Section 22; Section 23 
except NW\1/4\ NW\1/4\; Sections 24-27; Section 34 except SW\1/4\ 
SW\1/4\; Sections 35-36.
    T.27N., R.13E. Willamette Meridian: SW\1/4\ SW\1/4\ Section 18; 
W\1/2\ Section 19; NW\1/4\, W\1/2\ SW\1/4\ Section 30.
[GRAPHIC] [TIFF OMITTED] TR24MY96.034

    Map and description of WA-10-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Flattery, Skykomish River and 
Snoqualmie Pass, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.20N., R.10E. Willamette Meridian: S\1/2\ N\1/2\, S\1/2\ 
Section 2.
    T.21N., R.10E. Willamette Meridian: NE\1/4\ NW\1/4\, N\1/2\ 
NE\1/4\ Section 36.
    T.22N., R.09E. Willamette Meridian: S\1/2\ S\1/2\ Section 2; 
N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ Section 11; W\1/2\ NW\1/4\, 
S\1/2\, NE\1/4\ NW\1/4\, SE\1/4\ NE\1/4\ Section 12.
    T.22N., R.10E. Willamette Meridian: S\1/2\, NE\1/4\, S\1/2\ 
NW\1/4\ Section 13; S\1/2\, SE\1/4\ NE\1/4\ Section 14; W\1/2\, 
SE\1/4\ Section 18; Section 20; S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, 
E\1/2\ NE\1/4\ Section 22; Sections 23-26; SE\1/4\ Section 28; NE\1/
4\ NE\1/4\ Section 34; N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\ Section 35; 
N\1/2\ N\1/2\ Section 36.

[[Page 26294]]

    T.22N., R.11E. Willamette Meridian: S\1/2\ SW\1/4\, SE\1/4\ 
Section 18; W\1/2\ W\1/2\, NE\1/4\ NW\1/4\, SE\1/4\ SW\1/4\ Section 
20.
    T.23N., R.10E. Willamette Meridian: NW\1/4\ NW\1/4\ Section 2; 
W\1/2\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 3; Sections 4-9; 
W\1/2\, SW\1/4\ SE\1/4\ Section 10; W\1/2\, W\1/2\ E\1/2\ Section 
15; Sections 16-21; Section 22 except NE\1/4\ SE\1/4\, E\1/2\ NE\1/
4\; Section 27; NW\1/4\ NW\1/4\, E\1/2\ SE\1/4\, NE\1/4\ Section 28; 
N\1/2\ N\1/2\ Section 29.
    T.23N., R.11E. Willamette Meridian: Section 6 except E\1/2\ 
NE\1/4\, NE\1/4\ SE\1/4\; Section 7; SW\1/4\ Section 8; W\1/2\ NW\1/
4\ Section 17; N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 18.
    T.24N., R.10E. Willamette Meridian: S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\, E\1/2\ NE\1/4\ Section 9; N\1/2\, N\1/2\ SW\1/4\, SE\1/4\ 
Section 10; SW\1/4\, SW\1/4\ NW\1/4\, SW\1/4\ SE\1/4\ Section 11; 
W\1/2\ W\1/2\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\, NE\1/4\ NE\1/4\ 
Section 15; N\1/2\, N\1/2\ SW\1/4\, SE\1/4\ Section 16; E\1/2\ NE\1/
4\, NE\1/4\ SE\1/4\ Section 17; SE\1/4\ SW\1/4\, SE\1/4\ Section 21; 
Section 22 except NE\1/4\ NE\1/4\; SW\1/4\, SW\1/4\ NW\1/4\, S\1/2\ 
SE\1/4\ Section 23; SW\1/4\ SW\1/4\ Section 24; Section 25 except 
E\1/2\ SE\1/4\, NE\1/4\; NE\1/4\ NW\1/4\, S\1/2\, NE\1/4\ Section 
26; Section 27; Section 28 except NW\1/4\; Section 29 except NW\1/4\ 
NW\1/4\; Sections 31-36.
    T.24N., R.11E. Willamette Meridian: W\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\, SW\1/4\ SE\1/4\ Section 31.
[GRAPHIC] [TIFF OMITTED] TR24MY96.035

    Map and description of WA-11-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Snoqualmie Pass and Mt Rainier, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.17N., R.10E. Willamette Meridian: Sections 1-3; E\1/2\ E\1/2\ 
Section 4.
    T.17N., R.11E. Willamette Meridian: W\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\ Section 6; NE\1/4\ NW\1/4\ Section 7.
    T.18N., R.08E. Willamette Meridian: Sections 1-2; NW\1/4\, E\1/
2\ Section 3; N\1/2\ Section 4; N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ 
Section 10; Section 11 except S\1/2\ SW\1/4\; Sections 12-13; S\1/2\ 
SW\1/4\, NE\1/4\ SW\1/4\, E\1/2\ Section 14; E\1/2\ E\1/2\ Section 
22; Sections 23-25; N\1/2\, N\1/2\ SE\1/4\ Section 26; E\1/2\ NE\1/
4\ Section 27; SE\1/4\ SW\1/4\, SE\1/4\ Section 36.
    T.18N., R.09E. Willamette Meridian: Sections 1-30; Section 31 
except NW\1/4\ NW\1/4\; Sections 32-36.
    T.18N., R.10E. Willamette Meridian: Sections 1-12; NW\1/4\, N\1/
2\ SW\1/4\, SW\1/4\ SW\1/4\, N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 
13; Sections 14-23; SW\1/4\ NW\1/4\, NW\1/4\ SW\1/4\, S\1/2\ S\1/2\ 
Section 24; Sections 25-35; Section 36 except SE\1/4\ NE\1/4\.
    T.18N., R.11E. Willamette Meridian: NW\1/4\ NW\1/4\ Section 2; 
N\1/2\ N\1/2\ Section 3; N\1/2\ NW\1/4\ Section 4; N\1/2\ NE\1/4\, 
SW\1/4\ NW\1/4\ Section 5; Section 6; NW\1/4\, N\1/2\ SW\1/4\, W\1/
2\ NE\1/4\ Section 7; W\1/2\ Section 30; N\1/2\ NW\1/4\ Section 31.
    T.19N., R.10E. Willamette Meridian: Section 4; Section 6; 
Section 8; W\1/2\, S\1/2\ SE\1/4\ Section 10; S\1/2\ SW\1/4\, SE\1/
4\ Section 12; Section 14; Section 16; Section 18; Section 20; 
Section 22; Sections 24-26; Section 28; W\1/2\, SE\1/4\ Section 30; 
Section 32; W\1/2\, SE\1/4\ Section 34; Section 36.
    T.19N., R.11E. Willamette Meridian: W\1/2\, SE\1/4\ Section 18; 
Section 20; Section 28; Sections 30-32, Section 34 except NW\1/4\ 
NE\1/4\.
    T.20N., R.10E. Willamette Meridian: W\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\ Section 28; Section 30; Section 32 except NW\1/4\ SE\1/4\, 
SW\1/4\ NE\1/4\, N\1/2\ NE\1/4\; Section 34 except SE\1/4\ SE\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.036

    Map and description of WA-11-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Snoqualmie Pass and Mt Rainier, 
Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.17N, R.07E. Willamette Meridian: S\1/2\ N\1/2\, S\1/2\, NE\1/
4\ NE/14 Section 4; E\1/2\ SE\1/4\ Section 5; Section 8 except W\1/
2\ NW\1/4\; Section 9; Sections 16-21; Section 28; N\1/2\ N\1/2\ 
Section 29; Section 30.
    T.18N, R.07E. Willamette Meridian: SW\1/4\, SW\1/4\ SE\1/4\ 
Section 12; NW\1/4\, W\1/2\ NE\1/4\ Section 13; SE\1/4\ NW\1/4\, 
SW\1/4\, N\1/2\ SE\1/4\, NE\1/4\ Section 14; E\1/2\ NW\1/4\, NE\1/4\ 
SW\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ Section 22; NW\1/4\ NW\1/4\ 
Section 23; Section 36 except W\1/2\ NW\1/4\, NE\1/4\ NW\1/4\.
    T.18N, R.08E. Willamette Meridian: SW\1/4\ Section 20; S\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\ Section 28; Section 29 except NE\1/4\; S\1/
2\ SW\1/4\, NE\1/4\ SW\1/4\, SE\1/4\ Section 30; Sections 31-34; 
SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 35.
[GRAPHIC] [TIFF OMITTED] TR24MY96.037

    Map and description of WA-11-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Tacoma and Centralia, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.13N., R.03E. Willamette Meridian: Section 2; Section 4; 
Section 8; Section 10; Section 12; Section 14; Section 16; N\1/2\ 
NW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ Section 22; Section 24.
    T.13N., R.04E. Willamette Meridian: NE\1/4\ Section 2; Sections 
4-8; Section 16; Section 18; N\1/2\, SE\1/4\ Section 20; N\1/2\ 
SE\1/4\, SE\1/4\ SE\1/4\, NE\1/4\ Section 28.
    T.14N., R.03E. Willamette Meridian: Section 22; Section 24; 
Section 26; Section 28; Section 30; Section 32; Section 34; Section 
36.
    T.14N., R.04E. Willamette Meridian: Sections 2-5; SE\1/4\ 
Section 6; Sections 8-10; W\1/2\ Section 11; W\1/2\ SE\1/4\, SE\1/4\ 
SE\1/4\ Section 12; Sections 13-23; Section 24 except NW\1/4\; 
Section 25 except SW\1/4\; N\1/2\ N\1/2\ Section 26; Sections 27-32; 
E\1/2\ SW\1/4\, E\1/2\ Section 36.
    T.15N., R.04E. Willamette Meridian: S\1/2\ Section 21; S\1/2\ 
Section 22; NW\1/4\ NW\1/4\, S\1/2\ NW\1/4\, SW\1/4\ Section 26; 
Sections 27-28; E\1/2\ E\1/2\ Section 29; E1/2 Section 32; Sections 
33-34; W\1/2\ Section 35.
[GRAPHIC] [TIFF OMITTED] TR24MY96.038

    Map and description of WA-11-d taken from United States Fish and

[[Page 26295]]

Wildlife Service 1:100,000 map; Mt. Rainier, Washington; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.13N., R.07E. Willamette Meridian: Section 10; Section 12; 
Section 14; Section 22.
    T.13N., R.08E. Willamette Meridian: Sections 1-8; Section 9 
except SE\1/4\ SE\1/4\; N\1/2\ N\1/2\ Section 10; N\1/2\ NW\1/4\ 
NE\1/4\ SE\1/4\, NE\1/4\ Section 11; N\1/2\, NW\1/4\ SW\1/4\ Section 
12; W\1/2\, NW\1/4\ SE\1/4\ Section 16; Section 17; Section 18 
except S\1/2\ S\1/2\; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, N\1/2\ SE\1/
4\, NE\1/4\ Section 20; NW\1/4\, N\1/2\ SW\1/4\ Section 21.
    T.13N., R.09E. Willamette Meridian: NW\1/4\ NW\1/4\ Section 3; 
Section 4 except S\1/2\ SE\1/4\; Sections 5-6; N\1/2\, N\1/2\ S\1/2\ 
Section 7; N\1/2\, N\1/2\ SW\1/4\ Section 8; N\1/2\ NW\1/4\ Section 
9.
    T.14N., R.07E. Willamette Meridian: SW\1/4\ NW\1/4\, S\1/2\ 
Section 1; Section 2 except N\1/2\ NE\1/4\; Section 3; S\1/2\ SW\1/
4\, SE\1/4\ Section 4; E\1/2\ SE\1/4\ Section 7; S\1/2\, S\1/2\ N\1/
2\ Section 8; Sections 9-17; N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 
18; Section 20 except SW\1/4\, S\1/2\ SE\1/4\; N\1/2\, N\1/2\ SW\1/
4\, SE\1/4\ Section 21; Sections 22-24; Section 25 except SW\1/4\ 
SW\1/4\; Section 26 except S\1/2\ S\1/2\; N\1/2\, N\1/2\ SE\1/4\ 
Section 27; NE\1/4\ NE\1/4\ Section 28; NE\1/4\ SE\1/4\, NE\1/4\ 
NE\1/4\ Section 36.
    T.14N., R.08E. Willamette Meridian: S\1/2\ SE\1/4\ Section 2; 
SW\1/4\, W\1/2\ SE\1/4\ Section 3; Section 4; Section 5 except NW\1/
4\ NW\1/4\; SW\1/4\ NW\1/4\, S\1/2\ Section 6; Sections 7-36.
    T.14N., R.09E. Willamette Meridian: Section 7; W\1/2\ W\1/2\ 
Section 8; W\1/2\, SW\1/4\ SE\1/4\ Section 17; Sections 18-19; 
Section 20 except NE\1/4\ NE\1/4\; W\1/2\ SW\1/4\ Section 21; W\1/
2\, W\1/2\ SE\1/4\ Section 28; Section 29-32; Section 33 except 
NE\1/4\ NE\1/4\; SW\1/4\ SW\1/4\ Section 34.
    T.15N., R.07E. Willamette Meridian: W\1/2\, W\1/2\ SE\1/4\ 
Section 5; E\1/2\ E\1/2\ Section 6; E\1/2\ E\1/2\ Section 7; W\1/2\, 
W\1/2\ E\1/2\ Section 8; SW\1/4\ SW\1/4\ Section 16; N\1/2\ NW\1/4\, 
NW\1/4\ NE\1/4\, E\1/2\ SE\1/4\ Section 17; S\1/2\ NW\1/4\, N\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\, E\1/2\ Section 20; W\1/2\ W\1/2\, SE\1/4\ 
SW\1/4\ Section 21; S\1/2\ S\1/2\ Section 34.
    T.16N., R.07E. Willamette Meridian: Section 32.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.039
    
    Map and description of OR-01-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Astoria, Nehalem River, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.05N., R.07W. Willamette Meridian: S\1/2\ SE\1/4\ Section 3; 
N\1/2\ NE\1/4\ Section 10.

    Critical Habitat includes only State lands described within the 
following areas:

    T.08N., R.06W. Willamette Meridian: W\1/2\ SW\1/4\, SW\1/4\ 
NW\1/4\ Section 17; Section 18 except NE\1/4\ NE\1/4\; Section 19; 
W\1/2\ W\1/2\ Section 20; W\1/2\ Section 28; E\1/2\ Section 29; 
NW\1/4\, N\1/2\ SW\1/4\ Section 30; W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ 
Section 31; E\1/2\ Section 32; W\1/2\ Section 33.
    T.08N., R.07W. Willamette Meridian: Section 13; E\1/2\ Section 
14; Section 23 except NW\1/4\; Section 24-26; Section 36.
    T.07N., R.06W. Willamette Meridian: N\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\ Section 2; W\1/2\ W\1/2\, SE\1/4\ SW\1/4\ Section 3; Section 
4; Sections 9-11; Sections 13-14; Section 16; Sections 25-36.
    T.07N., R.07W. Willamette Meridian: Sections 30-31; NW\1/4\, 
S\1/2\ SW\1/4\ Section 32.
    T.07N., R.08W. Willamette Meridian: Section 22 except N\1/2\ 
N\1/2\; Section 23 except N\1/2\ NW\1/4\; Section 24 except NE\1/4\; 
Section 25; Section 26 except S\1/2\ SW\1/4\; N\1/2\, N\1/2\ SW\1/
4\, SE\1/4\ SW\1/4\ Section 27; NE\1/4\ Section 28; S\1/2\, NE\1/4\ 
NW\1/4\ Section 35; Section 36.
    T.06N., R.06W. Willamette Meridian: Section 1 except N\1/2\ 
NE\1/4\; Sections 2-6; NE\1/4\ NE\1/4\ Section 7; Sections 8-10; 
S\1/2\, NW\1/4\ NW\1/4\, S\1/2\ NW\1/4\ Section 11; W\1/2\ SW\1/4\ 
Section 12; Section 13 except SW\1/4\, NE\1/4\ NE\1/4\; Section 14 
except S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\; Section 15; Section 16 
except SW\1/4\ SE\1/4\, SE\1/4\ SW\1/4\; Section 17 except N\1/2\ 
NW\1/4\; SE\1/4\ NE\1/4\ Section 18; S\1/2\ SE\1/4\, NE\1/4\ SE\1/
4\, S\1/2\ SW\1/4\ Section 19; E\1/2\ NE\1/4\ Section 21; N\1/2\ 
N\1/2\ Section 22; N\1/2\ NW\1/4\ Section 23; NE\1/4\ NW\1/4\, E\1/
2\ Section 24; W\1/2\ Section 28; SW\1/4\, W\1/2\ NW\1/4\, E\1/2\ 
NE\1/4\, SW\1/4\ SE\1/4\ Section 29; Sections 30-32; S\1/2\ NW\1/4\, 
W\1/2\ SW\1/4\, SW\1/4\ NE\1/4\ Section 33.
    T.06N., R.07W. Willamette Meridian: Sections 1-3; N\1/2\ NE\1/
4\, NE\1/4\ NW\1/4\ Section 4; NW\1/4\ NW\1/4\ Section 5; N\1/2\ 
NE\1/4\ Section 6; E\1/2\ SE\1/4\ Section 9; Sections 10-15; NE\1/4\ 
NE\1/4\, S\1/2\ SW\1/4\ Section 16; S\1/2\ S\1/2\ Section 17; W\1/2\ 
Section 18; S\1/2\, W\1/2\ NW\1/4\ Section 19; Sections 20-23; W\1/
2\ SW\1/4\ Section 24; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\, SE\1/4\ 
SE\1/4\ Section 25; Sections 26-28; S\1/2\, W\1/2\ NW\1/4\ Section 
29; Section 30; NE\1/4\, N\1/2\ NW\1/4\ Section 31; E\1/2\ SE\1/4\, 
N\1/2\ Section 32; Section 33; NE\1/4\, S\1/2\ SW\1/4\, SE\1/4\ 
SE\1/4\ Section 34; N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, E\1/2\ SW\1/4\, 
SW\1/4\ SW\1/4\ Section 35; E\1/2\, SW\1/4\ SW\1/4\, E\1/2\ SW\1/4\ 
Section 36.
    T.06N., R.08W. Willamette Meridian: NE\1/4\ Section 13; SE\1/4\, 
E\1/2\ SW\1/4\, S\1/2\ NE1/4 Section 24; E\1/2\ Section 25; SW\1/4\ 
Section 27; Section 28 except NE\1/4\; Section 29 except NW\1/4\; 
E\1/2\ Section 32; Sections 33-34.
    T.05N., R.06W. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\, NW\1/4\ SW\1/4\, NE\1/4\ SW\1/4\ Section 6.
    T.05N., R.07W. Willamette Meridian: E\1/2\ NW\1/4\, NW\1/4\ 
NW\1/4\, NE\1/4\, N\1/2\ SE\1/4\ Section 1; N\1/2\ NW\1/4\ Section 
3; NE\1/4\ NE\1/4\ Section 4.
[GRAPHIC] [TIFF OMITTED] TR24MY96.040

    Map and description of OR-01-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Nehalem River, Oregon; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.03N., R.08W. Willamette Meridian: Sections 6-7; Sections 16-
17; Section 18 south of Foss River; Sections 19-21; Sections 27-28.
    T.03N., R.09W. Willamette Meridian: Section 1 except W\1/2\ 
NW\1/4\; SE\1/4\ SW\1/4\, SE\1/4\ Section 2; NW\1/4\, W\1/2\ SW\1/4\ 
Section 3; E\1/2\, S\1/2\ SW\1/4\, NE\1/4\ NW\1/4\ Section 4; 
Section 5 except W\1/2\ NW\1/4\; Section 8 except SW\1/4\ NW\1/4\, 
NW\1/4\ SW\1/4\; Sections 9-16; Section 21 except W\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\; Section 23 lying N of Foss River; E\1/2\, NW\1/4\ 
Section 24 lying N of Foss River; Section 28.
    T.03N., R.10W. Willamette Meridian: W1/2 Section 1; Section 2 
except NW\1/4\; SW\1/4\, S\1/2\ SE\1/4\ Section 5; Section 6 except 
NW\1/4\ NW\1/4\, NE\1/4\ NE\1/4\; Section 7; N\1/2\ NE\1/4\, SE\1/4\ 
NE\1/4\, NW\1/4\ NW\1/4\ Section 8; W\1/2\ NE\1/4\ Section 11; 
Section 12 except E\1/2\ E\1/2\, W\1/2\ SW\1/4\; NW\1/4\ NE\1/4\ 
Section 13; S\1/2\, E\1/2\ NE\1/4\ Section 17; Section 18 except 
N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\.
    T.03N., R.11W. Willamette Meridian: S1/2 Section 1; Section 12.
    T.04N., R. 08W. Willamette Meridian: SW\1/4\, S\1/2\ NW\1/4\, 
NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 8; SE\1/4\ Section 10; S\1/
2\ S\1/2\, W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\ Section 14; Section 15 
except NW\1/4\; Section 17 except NW\1/4\ SW\1/4\; Sections 19-20; 
Section 21 except N\1/2\ NW\1/4\; Section 22 except S\1/2\ NE\1/4\, 
NW\1/4\ NE\1/4\; E\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, W\1/2\ NE\1/4\ 
Section 23; Section 27-29; SE\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\, 
NE\1/4\ NW\1/4\, E\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ Section 31; 
Sections 32-34.
    T.04N., R.09W. Willamette Meridian Section 10 except NW1/4; 
SW\1/4\ Section 11; Sections 13-14; NE\1/4\, S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\ Section 15; NE\1/4\, NW\1/4\ SE\1/4\ Section 22; Section 23 
except S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\; N\1/2\, NW\1/4\ SW\1/4\, 
NW\1/4\ SE\1/4\ Section 24; SW\1/4\ SW\1/4\ Section 28; Section 32 
except W\1/2\ W\1/2\, NE\1/4\ NW\1/4\; W\1/2\ W\1/2\, S\1/2\ SE\1/
4\, SE\1/4\ SW\1/4\ Section 33; Section 34 except N\1/2\, NE\1/4\ 
SW\1/4\; SW\1/4\ SW\1/4\ Section 35.
    T.04N., R.10W. Willamette Meridian: S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\, SE\1/4\ SE\1/4\ Section 30; E\1/2\ W\1/2\, NW\1/4\ NW\1/4\, 
W\1/2\ SW\1/4\ Section 31.

[[Page 26296]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.041

    Map and description of OR-01-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Nehalem River and Yamhill River, 
Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.01N., R.09W. Willamette Meridian: W\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\, SW\1/4\ NW\1/4\ Section 25; SE\1/4\, SE\1/4\ SW\1/4\, SE\1/
4\ NE\1/4\ Section 26; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 34; 
Section 35 except SW\1/4\.
    T.01S., R.08W. Willamette Meridian: Section 7 except E\1/2\ 
NE\1/4\, SE\1/4\; S\1/2\ Section 17; S\1/2\, SE\1/4\ NE\1/4\ Section 
18; N\1/2\ N\1/2\, SW\1/4\ NE\1/4\, SE\1/4\ NW\1/4\, SE\1/4\ SE\1/4\ 
Section 19; N\1/2\ N\1/2\, NE\1/4\ SW\1/4\, SW\1/4\ SW\1/4\ Section 
20; Section 21 except N\1/2\ NE\1/4\, S\1/2\ SW\1/4\; W\1/2\ Section 
22; S\1/2\ SW\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\, SW\1/4\ NE\1/
4\, W\1/2\ SE\1/4\ Section 27; S\1/2\ NW\1/4\, S\1/2\ SE\1/4\, N\1/
2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 28; S\1/2\ NE\1/4\, N\1/2\ SE\1/
4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\ Section 29; NE\1/4\, N\1/2\ 
NW\1/4\, SW\1/4\ NW\1/4\, SE\1/4\ SE\1/4\ Section 30; N\1/2\ NE\1/4\ 
Section 31.
    T.01S., R.09W. Willamette Meridian: Section 1 except E\1/2\ E\1/
2\; E\1/2\ E\1/2\, NW\1/4\ NE\1/4\ Section 2; N\1/2\ SW\1/4\ Section 
3; Section 4 except SE\1/4\ SE\1/4\; NE\1/4\, N\1/2\ SE\1/4\, E\1/2\ 
NW\1/4\ Section 5; S\1/2\ NE\1/4\, NW\1/4\ NE\1/4\, N\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, E\1/2\ SW\1/4\, E\1/2\ SE\1/4\ Section 9; S\1/2\, 
S\1/2\ NW\1/4\, SW\1/4\ NE\1/4\ Section 10; Section 11 except N\1/2\ 
NE\1/4\; NW\1/4\, W\1/2\ SW\1/4\, E\1/2\ NE\1/4\, Section 12; E\1/2\ 
NW\1/4\, SW\1/4\ NE\1/4\ Section 13; W\1/2\ NE\1/4\, NW\1/4\, NE\1/
4\ SW\1/4\, SW\1/4\ SW\1/4\ Section 14; N\1/2\ NW\1/4\, NE\1/4\ 
NE\1/4\ Section 15.
    T.01S., R.11W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 13.

    Critical Habitat includes only State lands described within the 
following areas:

    T.02N., R.09W. Willamette Meridian: Section 3; E\1/2\, NW\1/4\ 
Section 7; S\1/2\ Section 16; Section 18 except SW\1/4\ NW\1/4\, 
N\1/2\ NW\1/4\; Sections 19-22; Sections 29-32.
    T.02N., R.10W. Willamette Meridian: E\1/2\ E\1/2\, NW\1/4\ SE\1/
4\ Section 24; S\1/2\ SE\1/4\ Section 25; Section 36 except NW\1/4\ 
NW\1/4\, NW\1/4\ SW\1/4\.
    T.01N., R.09W. Willamette Meridian: Section 9; Section 16 except 
SW\1/4\; SW\1/4\, E\1/2\ SE\1/4\ Section 19; Section 20 except NE\1/
4\ NE\1/4\; S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\ Section 21; Section 26 
except SE\1/4\, SE\1/4\ SW\1/4\, SE\1/4\ NE\1/4\; Section 27; W\1/2\ 
Section 28; Section 29 except NW\1/4\; Section 30; NE\1/4\, N\1/2\ 
NW\1/4\, NE\1/4\ SE\1/4\ Section 31; N\1/2\, S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\ Section 32; S\1/2\ SW\1/4\, SE\1/4\, N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\, NW\1/4\ SW\1/4\ Section 33; Section 34 except E\1/2\ SE\1/
4\, SE\1/4\ NE\1/4\, S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ NW\1/
4\; NW\1/4\ NW\1/4\ Section 35; Section 36.

    T.01N., R.10W. Willamette Meridian: N\1/2\ NE\1/4\ Section 1; 
SW\1/4\ SW\1/4\ Section 2; SE\1/4\ SE\1/4\ Section 3; E\1/2\ NE\1/
4\, NE\1/4\ SE\1/4\ Section 10; W\1/2\, SE\1/4\ SE\1/4\ Section 11; 
Section 13 except N\1/2\ NE\1/4\; S\1/2\ SE\1/4\ Section 14; SE\1/
4\, SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\ Section 22; Section 23 except 
W\1/2\ NW\1/4\; Sections 24-26; E\1/2\, NW\1/4\, E\1/2\ SW\1/4\ 
Section 27; N\1/2\ NE\1/4\ Section 34; NE\1/4\, N\1/2\ SE\1/4\ 
Section 35; NE\1/4\ Section 36.
    T.01S., R.08W. Willamette Meridian: N\1/2\ Section 6; SE\1/4\ 
Section 7; SW\1/4\ Section 16; N\1/2\ S\1/2\, SE\1/4\ NW\1/4\ 
Section 17; NW\1/4\ NW\1/4\, SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\, NW\1/
4\ SE\1/4\ Section 18; Section 19 except SW\1/4\, SW\1/4\ NW\1/4\, 
SE\1/4\ NE\1/4\, N\1/2\ SE\1/4\, SW\1/4\ SE\1/4\; Section 20 except 
S\1/2\ S\1/2\, N\1/2\ N\1/2\, NE\1/4\ SW\1/4\; S\1/2\ SW\1/4\, 
Section 21; N\1/2\ N\1/2\, SW\1/4\ NE\1/4\ Section 28.
    T.01S., R.09W. Willamette Meridian: E\1/2\ E\1/2\ Section 1; 
Section 3 except N\1/2\ SW\1/4\; SE\1/4\ SE\1/4\ Section 4; S\1/2\ 
SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ SW\1/4\ Section 7; E\1/2\ SE\1/4\ 
Section 8; W\1/2\ SW\1/4\, W\1/2\ SE\1/4\ Section 9; Section 13 
except N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\; S\1/2\ 
SE\1/4\, SE\1/4\ SW\1/4\ Section 14; N\1/2\ NE\1/4\, NW\1/4\ Section 
16; N\1/2\, N\1/2\ SE\1/4\ Section 17; NE\1/4\, E\1/2\ NW\1/4\ 
Section 18; NW\1/4\, W\1/2\ NE\1/4\ Section 23; S\1/2\ SW\1/4\, 
NE\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 24; Section 25; NE\1/4\, 
E\1/2\ NW\1/4\, N\1/2\ SE\1/4\ Section 36.
    Critical Habitat includes only State owned and State managed lands 
described within the following areas:

    NE\1/4\, N\1/2\ SE\1/4\, NW\1/4\ SE\1/4\, E\1/2\ NW\1/4\ Section 
13.

    Critical Habitat includes only County lands described within the 
following areas:

    T.01N., R.09W. Willamette Meridian: SW\1/4\ Section 16; N\1/2\, 
SE\1/4\, NE\1/4\ SW\1/4\ Section 21; E\1/2\ Section 28; NE\1/4\ 
Section 33.
[GRAPHIC] [TIFF OMITTED] TR24MY96.042

    Map and description of OR-01-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Nehalem River, Oregon; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.04N., R.06W. Willamette Meridian: W\1/2\ NW\1/4\, NE\1/4\ 
NW\1/4\, NW\1/4\ NE\1/4\ Section 4; Section 5 except SW\1/4\; 
Section 30 except NE\1/4\; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\, NW\1/4\ 
NE\1/4\ Section 31.
    T.04N., R.07W. Willamette Meridian: SW\1/4\, S\1/2\ NW\1/4\ 
Section 1; Section 2 except NE\1/4\, SW\1/4\ NW\1/4\; N\1/2\ N\1/2\, 
SE\1/4\ NE\1/4\, S\1/2\ NE\1/4\ Section 3; SE\1/4\, S\1/2\ NE\1/4\, 
NW\1/4\ SW\1/4\ Section 9; N\1/2\ N\1/2\, S\1/2\ SW\1/4\, SE\1/4\ 
NE\1/4\, SE\1/4\ SE\1/4\ Section 10; Section 11 except N\1/2\ NE\1/
4\, SE\1/4\ NE\1/4\, SW\1/4\ SE\1/4\, NW\1/4\ SW\1/4\; Section 13 
except NW\1/4\ NE\1/4\, SE\1/4\ SE\1/4\; Section 14 except NW\1/4\ 
NE\1/4\; Section 15; Section 16 except E\1/2\ NE\1/4\, NE\1/4\ SE\1/
4\; Sections 21-22; Section 23 except S\1/2\ SE\1/4\; Section 24 
except E\1/2\ NE\1/4\, SW\1/4\ SW\1/4\; NE\1/4\, E\1/2\ NW\1/4\, 
E\1/2\ SE\1/4\ Section 25.
    T.05N., R.06W. Willamette Meridian: Section 1 except NE\1/4\; 
Sections 2-3; SE\1/4\, S\1/2\ SW\1/4\, S\1/2\ NE\1/4\ Section 7; 
Sections 8-18; Section 19 except E\1/2\ NE\1/4\; Section 20 except 
N\1/2\ NW\1/4\; Sections 21-22; Section 23 except SE\1/4\ SE\1/4\; 
Section 24; E\1/2\ NE\1/4\, NW\1/4\ NE\1/4\ Section 25; Sections 27-
30; Section 31 except W\1/2\ W\1/2\; Sections 32-33; Section 34 
except SE\1/4\.
    T.05N., R.07W. Willamette Meridian: E\1/2\ E\1/2\, SW\1/4\ SE\1/
4\, SE\1/4\ SW\1/4\ Section 13; Section 22 except S\1/2\ S\1/2\; 
N\1/2\ SW\1/4\ Section 23; Section 24 except NE\1/4\, NW\1/4\ NW\1/
4\; Sections 25-26; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 27; 
SE\1/4\ Section 33; E\1/2\ Section 34; Section 35 except N\1/2\ 
NE\1/4\, NE\1/4\ NW\1/4\; N\1/2\ Section 36.
    T.05N., R.08W. Willamette Meridian: S\1/2\ NW\1/4\ Section 25; 
SE\1/4\ NE\1/4\ Section 26.
    T.06N., R.06W. Willamette Meridian: S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 23; Section 26 except NE\1/4\; Section 35 except 
SW\1/4\ NE\1/4\; Section 36 except N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.043

    Map and description of OR-02-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Yamhill River, Oregon; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.02S., R.09W. Willamette Meridian: Section 22 except SW\1/4\, 
S\1/2\ NW\1/4\, S\1/2\

[[Page 26297]]

NE\1/4\, SW\1/4\ SE\1/4\; Sections 23-25; N\1/2\ Section 26; E\1/2\ 
NE\1/4\, SW\1/4\ NE\1/4\ Section 27.
    T.02S., R.08W. Willamette Meridian: SW\1/4\ Section 19; N\1/2\ 
SW\1/4\, NW\1/4\ Section 29; Section 30.
[GRAPHIC] [TIFF OMITTED] TR24MY96.044

    Map and description of OR-02-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Yamhill River, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.03S., R.09W. Willamette Meridian: SW\1/4\, W\1/2\ SE\1/4\, 
SW\1/4\ NW\1/4\ Section 3; S\1/2\, SW\1/4\ NW\1/4\, SE\1/4\ NE\1/4\, 
W\1/2\ NE\1/4\; Section 4; E\1/2\ SE\1/4\ Section 8; Section 9; 
Section 10 except N\1/2\ SE\1/4\; NW\1/4\ Section 15; N\1/2\ Section 
16; S\1/2\ NW\1/4\, N\1/2\ SW\1/4\ Section 19; S\1/2\ SW\1/4\ 
Section 32.
    T.03S., R.10W. Willamette Meridian: SE\1/4\, E\1/2\ SW\1/4\, 
S\1/2\ NE\1/4\ Section 22; Section 23 except N\1/2\ NW\1/4\; S\1/2\, 
E\1/2\ NE\1/4\, SW\1/4\ NW\1/4\ Section 24; W\1/2\ NW\1/4\ Section 
25; Section 26; Section 27 except SW\1/4\ NE\1/4\; E\1/2\, E\1/2\ 
W\1/2\ Section 28; Section 32 except N\1/2\ N\1/2\, W\1/2\ SW\1/4\; 
Section 33; N\1/2\ NE\1/4\, W\1/2\ SW\1/4\, NW\1/4\ Section 34; 
Section 35 except S\1/2\ S\1/2\, NW\1/4\ SW\1/4\.
    T.04S., R.09W. Willamette Meridian: S\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 4; W\1/2\, W\1/2\ E\1/2\, SE\1/4\ SE\1/4\ Section 5; 
Section 6 except W\1/2\ W\1/2\; Section 7 except W\1/2\ NW\1/4\; 
Sections 8-9; SW\1/4\, SW\1/4\ SE\1/4\, S\1/2\ NW\1/4\ Section 10; 
NW\1/4\, W\1/2\ NE\1/4\ Section 15; N\1/2\, SE\1/4\ Section 16; N\1/
2\ Section 17; N\1/2\ Section 18.
    T.04S., R.10W. Willamette Meridian: SW\1/4\, S\1/2\ NW\1/4\, 
NW\1/4\ NW\1/4\, W\1/2\ E\1/2\ Section 3; E\1/2\, N\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, SE\1/4\ Section 4; N\1/2\, SW\1/4\, W\1/2\ SE\1/4\ 
Section 5; E\1/2\ SW\1/4\, E\1/2\ Section 6; N\1/2\ NE\1/4\, NE\1/4\ 
NW\1/4\ Section 7; NE\1/4\ Section 9.
    T.05S., R.09W. Willamette Meridian: SW\1/4\ Section 5; SE\1/4\, 
SW\1/4\ NE\1/4\, E\1/2\ SW\1/4\ Section 6; Section 7; W\1/2\, S\1/2\ 
SE\1/4\, NW\1/4\ SE\1/4\ Section 8; NW\1/4\, SE\1/4\ SW\1/4\, W\1/2\ 
NE\1/4\, N\1/2\ SW\1/4\ Section 17; Section 18; N\1/2\ Section 19; 
NW\1/4\ NW\1/4\ Section 20.
    T.05S., R.10W. Willamette Meridian: Section 1; Section 2 except 
S\1/2\ S\1/2\, NE\1/4\ NE\1/4\; NE\1/4\, E\1/2\ NW\1/4\, SE\1/4\ 
SW\1/4\, SW\1/4\ NW\1/4\, SW\1/4\ SE\1/4\, NE\1/4\ SW\1/4\ Section 
3; S\1/2\ NE\1/4\ Section 4; N\1/2\ NE\1/4\, E\1/2\ NW\1/4\, NW\1/4\ 
NW\1/4\, SW\1/4\ SE\1/4\, SE\1/4\ SW\1/4\ Section 10; NW\1/4\ NW\1/
4\, SE\1/4\ NW\1/4\, NW\1/4\ SW\1/4\ Section 11; E\1/2\, E\1/2\ 
NW\1/4\, SW\1/4\ NW\1/4\, NE\1/4\ SW\1/4\ Section 12; NE\1/4\ NW\1/
4\, E\1/2\ Section 13; SW\1/4\ Section 14; SW\1/4\, SW\1/4\ NW\1/4\ 
Section 17; Section 20 except W\1/2\ W\1/2\, SE\1/4\ NE\1/4\; NW\1/
4\, E\1/2\ SE\1/4\ Section 22; SE\1/4\ NW\1/4\, NW\1/4\ SE\1/4\, 
SW\1/4\ NE\1/4\, SW\1/4\ SW\1/4\, SE\1/4\ SE\1/4\, NW\1/4\ SE\1/4\, 
N\1/2\ N\1/2\ Section 23; NW\1/4\ NE\1/4\, E\1/2\ NW\1/4\ Section 
24; N\1/2\ N\1/2\ Section 26; S\1/2\ Section 32; S\1/2\ S\1/2\, 
NE\1/4\ SE\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\, SE\1/4\ NE\1/4\ 
Section 33; W\1/2\ SE\1/4\ Section 34.
    T.06S., R.10W. Willamette Meridian: Section 2; W\1/2\ W\1/2\, 
SE\1/4\ SE\1/4\, NE\1/4\ SW\1/4\ Section 3; Section 4; N\1/2\ S\1/
2\, N\1/2\ Section 5; W\1/2\ W\1/2\, E\1/2\ SW\1/4\, E\1/2\ SE\1/4\ 
Section 6; Section 7; Section 8 except N\1/2\ NE\1/4\; Section 9 
except NW\1/4\ NW\1/4\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\; Section 10; 
Section 11 except NE\1/4\, SE\1/4\ SE\1/4\; SW\1/4\ Section 12; S\1/
2\, NW\1/4\ NE\1/4\ Section 14; W\1/2\, SE\1/4\ Section 15; Section 
16 except N\1/2\ NE\1/4\; Section 17-18; NW\1/4\, W\1/2\ SW\1/4\, 
W\1/2\ E\1/2\ Section 19; W\1/2\ NE\1/4\, E\1/2\ NW\1/4\ Section 20; 
Sections 21-22; W\1/2\, W\1/2\ E\1/2\ Section 23; S\1/2\ NW\1/4\, 
S\1/2\ SW\1/4\ Section 26; W\1/2\ W\1/2\, NE\1/4\, NE\1/4\ NW\1/4\, 
SE\1/4\ SE\1/4\ Section 27; Section 28 except SW\1/4\ NW\1/4\; NE\1/
4\, NW\1/4\ SE\1/4\ Section 30.
    T.06S., R.11W. Willamette Meridian: Section 1-2; Section 11; 
Section 12; Section 13 except SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\; 
NE\1/4\, N\1/2\ SE\1/4\ Section 14; Section 24 except SE\1/4\ SE\1/
4\, N\1/2\ NW\1/4\.

    Critical Habitat includes only State lands described within the 
following areas:

    T.05S., R.10W. Willamette Meridian: S\1/2\ NE\1/4\, E\1/2\ SE\1/
4\ Section 10; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 11.
[GRAPHIC] [TIFF OMITTED] TR24MY96.045

    Map and description of OR-02-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Yamhill River and Corvallis, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.06S., R.10W. Willamette Meridian: SE\1/4\ Section 32.
    T.07S., R.09W. Willamette Meridian: SW\1/4\, W\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, SW\1/4\ SE\1/4\ Section 3; SE\1/4\, E\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\, NE\1/4\ SW\1/4\ Section 4; W\1/2\ NW\1/4\ Section 
5; Section 8 except S\1/2\ SW\1/4\ SW\1/4\ SE\1/4\; Section 9 except 
N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ NW\1/4\, SW\1/4\ SE\1/4\, 
SE\1/4\ SW\1/4\; Section 16 except E\1/2\ E\1/2\, NE\1/4\ NW\1/4\; 
S\1/2\, E\1/2\ NE\1/4\ Section 17; Section 18 except NE\1/4\ NE\1/
4\; SW\1/4\, S\1/2\ NW\1/4\ Section 19; NE\1/4\, NW\1/4\ SE\1/4\ 
Section 20; W\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, S\1/2\ SW\1/4\ Section 
21; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 28; SE\1/4\ NE\1/4\ 
Section 29; N\1/2\ NW\1/4\ Section 30.
    T.07S., R.10W. Willamette Meridian: SW\1/4\, NW\1/4\ SE\1/4\ 
Section 3; Section 4 except E\1/2\ NE\1/4\; Section 5; Sections 7-9; 
Section 10 except E\1/2\ NW\1/4\, NE\1/4\; N\1/2\ S\1/2\, E\1/2\ 
NE\1/4\, SW\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ Section 11; Section 12 
except S\1/2\ NW\1/4\, N\1/2\ SW\1/4\, E\1/2\ NE\1/4\; Section 13; 
Section 14 except N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, 
NE\1/4\ NE\1/4\; Section 15 except S\1/2\ S\1/2\; Section 16 except 
SE\1/4\ SE\1/4\; Section 17; N\1/2\ Section 18; S\1/2\ S\1/2\ 
Section 20; NE\1/4\, SW\1/4\ Section 21; Sections 22-23; Section 24 
except NW\1/4\ SE\1/4\, SW\1/4\ NE\1/4\, NE\1/4\ SW\1/4\; Section 25 
except NW\1/4\; Section 26 except NW\1/4\; Sections 27-29; Section 
31 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\; Sections 32-35.
    T.08S., R.10W. Willamette Meridian: Sections 1-5; Section 6 
except NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\; Section 7 except NW\1/4\ 
SW\1/4\, S\1/2\ SW\1/4\, S\1/2\ SE\1/4\ S\1/2\ NE\1/4\; Section 8 
except S\1/2\ S\1/2\; Sections 9-14; Section 15 except SE\1/4\ SE\1/
4\; E\1/2\ E\1/2\, NW\1/4\ NE\1/4\, SW\1/4\ SE\1/4\ Section 16; 
SW\1/4\ SE\1/4\ Section 22; Sections 23 except SW\1/4\ NW\1/4\, 
NW\1/4\ SW\1/4\; Section 24 except SE\1/4\ SE\1/4\; NE\1/4\ NW\1/4\, 
NW\1/4\ NE\1/4\ Section 25; Section 26 except SE\1/4\, E\1/2\ NE\1/
4\; W\1/2\ NE\1/4\ Section 28.
[GRAPHIC] [TIFF OMITTED] TR24MY96.046

    Map and description of OR-02-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Corvallis, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.07S., R.06W. Willamette Meridian: SW\1/4\ Section 4; Section 5 
except N\1/2\ NE\1/4\, NW\1/4\ NW\1/4\; Section 6 except NE\1/4\, 
N\1/2\ NW\1/4\, NW\1/4\ SE\1/4\; Section 7; S\1/2\ S\1/2\, NE\1/4\ 
SW\1/4\, N\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 9; Section 17 
except NW\1/4\, W\1/2\ NE\1/4\, NW\1/4\ SW\1/4\.
    T.07S., R.07W. Willamette Meridian: Section 1 except N\1/2\ 
NE\1/4\; Sections 2-3;

[[Page 26298]]

Section 4 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\; Section 5; Section 
7; N\1/2\ Section 8; Section 9; Section 11 except SE\1/4\ SW\1/4\, 
SW\1/4\ SE\1/4\; Section 13 except NE\1/4\ SE\1/4\; Section 15; 
Section 17; N\1/2\ Section 18; Section 19; Section 21; Section 23; 
N\1/2\ Section 25; N\1/2\ Section 26; Section 27; Section 29; 
Section 31; Section 33; NW\1/4\ Section 34.
    T.07S., R.08W. Willamette Meridian: Section 1; SE\1/4\ Section 
12; Section 13; S\1/2\, S\1/2\ N\1/2\ Section 14; Section 15 except 
W\1/2\ W\1/2\; Section 17; Section 18 except W\1/2\ W\1/2\; Section 
19 except W\1/2\ W\1/2\; W\1/2\ Section 20; Section 23; Section 25; 
Section 27; Section 28 except E\1/2\ SW\1/4\, S\1/2\ NW\1/4\; 
Section 29 except SE\1/4\; Section 30 except W\1/2\ W\1/2\; Section 
31 except W\1/2\ W\1/2\, E\1/2\ SE\1/4\; Section 32 except NE\1/4\; 
N\1/2\, N\1/2\ SW\1/4\, NW\1/4\ SE\1/4\ Section 33; Section 35.
    T.08S., R.07W. Willamette Meridian: NE\1/4\ Section 3; SW\1/4\ 
SE\1/4\, N\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 4; Section 5; NE\1/
4\ NE\1/4\ Section 17.
    T.08S., R.08W. Willamette Meridian: Section 1 except SE\1/4\; 
Section 3 except W\1/2\ W\1/2\.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.07S., R.06W. Willamette Meridian: SE\1/4\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 4; E\1/2\ NW\1/4\ Section 9.
[GRAPHIC] [TIFF OMITTED] TR24MY96.047

    Map and description of OR-02-e taken from United States Fish and 
Wildlife Service 1:100,000 map; Yamhill River, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.01S., R.05W. Willamette Meridian: Section 19 except NW\1/4\.
    T.02S., R.05W. Willamette Meridian: N\1/2\ N\1/2\ Section 3; 
SW\1/4\ NE\1/4\ Section 5; SW\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ Section 
7.
    T.02S., R.06W. Willamette Meridian: S\1/2\ NW\1/4\ Section 25; 
S\1/2\ NW\1/4\, NE\1/4\, S\1/2\ S\1/2\ Section 26; Section 35.
    T.02S., R.08W. Willamette Meridian: Section 31 except W\1/2\ 
NW\1/4\, E\1/2\ SE\1/4\; NW\1/4\, SW\1/4\ NE\1/4\, SE\1/4\, N\1/2\ 
SW\1/4\ Section 32; Section 33 except NW\1/4\ NW\1/4\; W\1/2\ NW\1/
4\, NW\1/4\ SW\1/4\ Section 34.
    T.03S., R.06W. Willamette Meridian: N\1/2\ NW\1/4\ Section 1; 
Section 7; SE\1/4\, NE\1/4\ SW\1/4\ Section 13; S\1/2\ SW\1/4\ 
Section 16; Sections 17-20; W\1/2\, W\1/2\ E\1/2\ Section 21; SE\1/
4\ SE\1/4\ Section 27; SW\1/4\, S\1/2\ NW\1/4\, NW\1/4\ SE\1/4\, 
SW\1/4\ NE\1/4\ Section 28; Section 29; Section 30 except NE\1/4\; 
Section 31; W\1/2\ Section 32; Section 33 except SW\1/4\; SE\1/4\ 
Section 36.
    T.03S., R.07W. Willamette Meridian: S\1/2\ Section 5; Section 7; 
S\1/2\ NE\1/4\, W\1/2\ NW\1/4\, N\1/2\ SW\1/4\, N\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\ Section 8; Section 9; Section 10 except N\1/2\ NE\1/
4\, NW\1/4\ NW\1/4\; Section 11; Section 12 except E\1/2\ E\1/2\, 
SW\1/4\ NE\1/4\; Sections 13-15; S\1/2\ Section 16; Section 17; 
SW\1/4\, N\1/2\ NE\1/4\, W\1/2\ NW\1/4\ Section 18; Section 19; 
Section 20 except W\1/2\ W\1/2\, SE\1/4\ SW\1/4\; Sections 21-25; 
E\1/2\ Section 26; Sections 27-29; E\1/2\ Section 30; Section 31; 
Section 32 except S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\; Section 33 except 
NW\1/4\ NW\1/4\, SW\1/4\ SW\1/4\; N\1/2\, SE\1/4\ Section 34; 
Section 35; W\1/2\ Section 36.
    T.03S., R.08W. Willamette Meridian: SW\1/4\, S\1/2\ SE\1/4\ 
Section 1; SW\1/4\ SE\1/4\ Section 2; Section 3; NW\1/4\, S\1/2\ 
SE\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 4; Section 5 except 
NW\1/4\, SW\1/4\ NE\1/4\; N\1/2\ NW\1/4\, SE\1/4\ Section 6; Section 
7 except N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, E\1/2\ NW\1/4\; Section 8 
except S\1/2\ SE\1/4\; Section 9; Section 10 except N\1/2\ NW\1/4\, 
NW\1/4\ NE\1/4\; Section 11; Section 13; NE\1/4\, N\1/2\ NW\1/4\, 
SE\1/4\ SW\1/4\ Section 14; Section 15 except SW\1/4\; W\1/2\ SW\1/
4\ Section 16; SW\1/4\ SE\1/4\, NW\1/4\ NW\1/4\ Section 17; Section 
18 except S\1/2\ SE\1/4\; Section 19 except N\1/2\ NE\1/4\; NE\1/4\ 
Section 20; Section 21 except NW\1/4\, N\1/2\ NE\1/4\; Section 22 
except SW\1/4\ NE\1/4\, SE\1/4\ NW\1/4\; Section 23; Section 24 
except N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\; Section 25 except NE\1/4\ 
SW\1/4\, SW\1/4\ NE\1/4\, NW\1/4\ SE\1/4\, SE\1/4\ NW\1/4\; N\1/2\ 
NE\1/4\, NW\1/4\ NW\1/4\, SE\1/4\ SE\1/4\; Section 26; Section 27 
except NE\1/4\ SW\1/4\, SW\1/4\ NE\1/4\, NW\1/4\ SE\1/4\, SE\1/4\ 
NW\1/4\; S\1/2\ S\1/2\, NW\1/4\ NW\1/4\ Section 29; S\1/2\, W\1/2\ 
NW\1/4\ Section 31; Section 32 except SW\1/4\, SW\1/4\ NW\1/4\, W\1/
2\ SE\1/4\; Sections 33-34; S\1/2\ Section 35; W\1/2\ NE\1/4\ 
Section 36.
    T.03S., R.09W. Willamette Meridian: Section 1 except S\1/2\ 
SE\1/4\, NE\1/4\ SE\1/4\, SW\1/4\ NW\1/4\; SE\1/4\ SE\1/4\ Section 
2; SE\1/4\ SE\1/4\ Section 10; Section 11 except NW\1/4\; Section 12 
except NE\1/4\ NE\1/4\; Section 13 except W\1/2\ NW\1/4\, E\1/2\ 
NE\1/4\; Section 14 except SW\1/4\; NE\1/4\ NE\1/4\ Section 15; 
NE\1/4\ Section 23; E\1/2\ NW\1/4\, NE\1/4\ Section 24.
    T.04S., R05W. Willamette Meridian: NW\1/4\ SE\1/4\ Section 19.
    T.04S., R.06W. Willamette Meridian: Section 5 except E\1/2\ E\1/
2\, SW\1/4\ SE\1/4\; Sections 6-7; S\1/2\ SW\1/4\, W\1/2\ SE\1/4\ 
Section 18.
    T.04S., R.07W. Willamette Meridian: Section 1 except NE\1/4\; 
W\1/2\, N\1/2\ NE\1/4\ Section 2; Section 3 except NW\1/4\; E\1/2\ 
E\1/2\, NW\1/4\ NE\1/4\, NE\1/4\ NW\1/4\, SE\1/4\ SW\1/4\, SW\1/4\ 
SE\1/4\ Section 4; N\1/2\, E\1/2\ SE\1/4\, SW\1/4\ SW\1/4\ Section 
5; Section 6 except NE\1/4\, W\1/2\ SE\1/4\; Section 7; SW\1/4\, 
NE\1/4\ SE\1/4\ Section 8; Section 9; N\1/2\ Section 10; Section 11; 
Section 12 except SE\1/4\ SW\1/4\; Section 13; Section 14 except 
N\1/2\ NW\1/4\, S\1/2\ NE\1/4\, E\1/2\ SE\1/4\; Section 15 except 
SW\1/4\ SW\1/4\; E\1/2\ E\1/2\, NW\1/4\ NE\1/4\ Section 16; Section 
17 except N\1/2\ S\1/2\; Section 18 except NW\1/4\.
    T.04S., R.08W. Willamette Meridian: SE\1/4\ NE\1/4\, SE\1/4\, 
Section 1; NW\1/4\ NE\1/4\, N\1/2\ NW\1/4\, E\1/2\ SW\1/4\, SE\1/4\ 
Section 2; N\1/2\ N\1/2\, S\1/2\ S\1/2\ Section 3; Section 4 except 
S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ SW\1/4\; Sections 5-8; 
Section 9 except NW\1/4\ NE\1/4\, NE\1/4\ NW1/4; Section 10; Section 
11 except SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\; Section 12 except NE\1/
4\ SE\1/4\, E\1/2\ NE\1/4\; Sections 13-14; Section 15 except N\1/2\ 
NE\1/4\; Section 16; Sections 17-25; Section 26 except W\1/2\ SW\1/
4\; Section 27 except E\1/2\ SE\1/4\; Section 28-35; N\1/2\ Section 
36.
    T.04S., R.09W. Willamette Meridian: SE\1/4\, SE\1/4\ NE\1/4\ 
Section 1; SE\1/4\, E\1/2\ SW\1/4\ Section 11; Section 12 except 
NW\1/4\; Section 13; E\1/2\, E\1/2\ NW\1/4\ Section 14; SE\1/4\ 
SE\1/4\ Section 22; Section 23 except N\1/2\ NW\1/4\, SW\1/4\ NW\1/
4\; Sections 24-26; SE\1/4\, E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, SE\1/
4\ NW\1/4\ Section 27; NE\1/4\, SE\1/4\ SE\1/4\ Section 34; N\1/2\ 
N\1/2\, S\1/2\ S\1/2\, SW\1/4\ NW\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ 
SE\1/4\ Section 35; Section 36.
    T.05S., R.09W. Willamette Meridian: Sections 1-2; NE\1/4\ NE\1/
4\, SW\1/4\, SE\1/4\, SW\1/4\ NW\1/4\ Section 3; Section 4 except 
N\1/2\ N\1/2\, SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\; W\1/2\, NE\1/4\ 
NW\1/4\ Section 9; Section 10-15; Section 16 except W\1/2\ W\1/2\, 
NE\1/4\ NW\1/4\; Section 21 except W\1/2\ W\1/2\, SE\1/4\ SW\1/4\ 
\1/4\; Section 22; Section 23 except SE\1/4\, SW\1/4\ NW\1/4\; 
Section 24 except SW\1/4\; NE\1/4\ NE\1/4\ Section 25; Section 26 
except E\1/2\ E\1/2\; Section 27 except E\1/2\ NE\1/4\, SW\1/4\, 
NW\1/4\ NW\1/4\; Section 31 except N\1/2\ NW\1/4\; Section 32; 
Section 33 except E\1/2\ E\1/2\; Section 34 except W\1/2\; Section 
35.
    T.06S., R.09W. Willamette Meridian: N\1/2\ SW\1/4\, NW\1/4\ 
NE\1/4\, NW\1/4\ Section 2; N\1/2\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ 
Section 3; Section 4 except SE\1/4\ SE\1/4\, SW\1/4\ NW\1/4\, W\1/2\ 
SW\1/4\; N\1/2\ Section 5; N\1/2\ N\1/2\ Section 6; NE\1/4\, E\1/2\ 
NW\1/4\ Section 9.

    Critical Habitat includes only State lands described within the 
following areas:

    T.03S., R.07W. Willamette Meridian: N\1/2\ Section 16.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.048
    
    Map and description of OR-02-f taken from United States Fish and 
Wildlife Service 1:100,000 map; Yamhill River, Oregon; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

[[Page 26299]]

    T.06S., R.09W. Willamette Meridian: E\1/2\ SE\1/4\ Section 11; 
N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ Section 12; NW\1/4\ NW\1/4\ Section 
13; N\1/2\ NE\1/4\, NW\1/4\ Section 14; S\1/2\ NE\1/4\, S\1/2\ NW\1/
4\, N\1/2\ SW\1/4\, NE\1/4\ NE\1/4\, SW\1/4\ SW\1/4\ Section 15; 
S\1/2\ SW\1/4\, SE\1/4\, NE\1/4\ SW\1/4\ Section 16; E\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\, SE\1/4\, SE\1/4\ SW\1/4\ Section 20; W\1/2\ NW\1/
4\, NE\1/4\ NW\1/4\ Section 21; W\1/2\ NE\1/4\, E\1/2\ NW\1/4\ 
Section 29.
[GRAPHIC] [TIFF OMITTED] TR24MY96.049

    Map and description of OR-03-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Corvallis, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.09S., R.09W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 33; 
SW\1/4\ SW\1/4\ Section 34.
    T.10S., R.10W. Willamette Meridian: NW\1/4\ SE\1/4\ Section 2.

    Critical Habitat includes only State lands described within the 
following areas:

    T.09S., R.09W. Willamette Meridian: E\1/2\ SW\1/4\, W\1/2\ SE\1/
4\, NE\1/4\ SE\1/4\ Section 34.
    T.10S., R.09W. Willamette Meridian: NW\1/4\, W\1/2\ NE\1/4\ 
Section 16; N\1/2\ NE\1/4\, NE\1/4\ NW\1/4\ Section 17.

    Critical Habitat includes only County lands described within the 
following areas:

    T.10S., R.10W. Willamette Meridian:SW\1/4\ SE\1/4\ Section 2.

    Critical Habitat includes only Private lands described within 
the following areas:

    T.09S., R.09W. Willamette Meridian: S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\ Section 23; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 25; 
NE\1/4\ Section 26; W\1/2\ SW\1/4\ Section 34.
    T.10S., R.09W. Willamette Meridian: SW\1/4\ Section 15.
    T.10S., R.10W. Willamette Meridian: SE\1/4\ Section 14.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.050
    
    Map and description of OR-03-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Corvallis, Oregon; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.10S., R.06W. Willamette Meridian: W\1/2\ SW\1/4\ Section 30.
    T.10S., R.07W. Willamette Meridian: S\1/2\ Section 25; N\1/2\ 
Section 36.
    T.11S., R.07W. Willamette Meridian: S\1/2\ N\1/2\, SE\1/4\ 
Section 16; N\1/2\ Section 21; S\1/2\, NW\1/4\ Section 29; Section 
31; Section 32 except E\1/2\ SE\1/4\, NE\1/4\ SE\1/4\.
    T.11S., R.08W. Willamette Meridian: W\1/2\ SW\1/4\ Section 14; 
Section 15 except N\1/2\ NE\1/4\; Section 16 except S\1/2\ SW\1/4\; 
SW\1/4\, W\1/2\ SE\1/4\ Section 17; S\1/2\ SE\1/4\, E\1/2\ SW\1/4\ 
Section 18; Sections 19-21; W\1/2\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, 
NE\1/4\ NE\1/4\ Section 22; SW\1/4\, NW\1/4\ NW\1/4\ Section 23; 
SW\1/4\, NW\1/4\ SE\1/4\, S\1/2\ N\1/2\ Section 26; Section 27 
except SW\1/4\, NE\1/4\ NE\1/4\; N\1/2\ NW\1/4\ Section 28; Sections 
29-31; Section 32 except SE\1/4\; N\1/2\ NW\1/4\ Section 35.
    T.11S., R.09W. Willamette Meridian: S\1/2\ Section 7; NW\1/4\ 
NW\1/4\ Section 17; SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\, SE\1/
4\ NW\1/4\ Section 18; Section 23 except NW\1/4\; S\1/2\, NW\1/4\ 
NW\1/4\ Section 24; Section 25; Section 26 except S\1/2\ NW\1/4\, 
N\1/2\ SW\1/4\; NE\1/4\ Section 27; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ 
Section 34; Section 35.
    T.12S., R.07W. Willamette Meridian: Section 5 except S\1/2\, 
SW\1/4\ NW\1/4\.
    T.12S., R.08W. Willamette Meridian: NW\1/4\ Section 5; E\1/2\ 
E\1/2\, SW\1/4\ NE\1/4\ Section 6.
    T.12S., R.09W. Willamette Meridian S\1/2\ SW\1/4\, N\1/2\ NW\1/
4\, SE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\ Section 1; E\1/2\, E\1/2\ NW\1/
4\ Section 2.
[GRAPHIC] [TIFF OMITTED] TR24MY96.051

    Map and description of OR-03-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Corvallis, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.08S., R.06W. Willamette Meridian: SE\1/4\ NE\1/4\, NE\1/4\ 
NE\1/4\, SW\1/4\ NE\1/4\, S\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, S\1/2\ 
SE\1/4\, SW\1/4\ Section 31; W\1/2\ NW\1/4\ Section 33.
    T.08S., R.07W. Willamette Meridian: Section 31 except S\1/2\ 
SE\1/4\.
    T.09S., R.06W. Willamette Meridian: N\1/2\ NE\1/4\, NW\1/4\ 
Section 5; NE\1/4\, NW\1/4\, N\1/2\ SE\1/4\ Section 7.
    T.09S., R.07W. Willamette Meridian: Section 1 except NW\1/4\ 
NW\1/4\; Section 3 except NE\1/4\; Section 9 except SE\1/4\ SE\1/4\; 
Section 11; Section 13; W\1/2\, W\1/2\ NE\1/4\, NW\1/4\ SE\1/4\ 
Section 15; SE\1/4\, E\1/2\ SW\1/4\ Section 17; NW\1/4\, NW\1/4\ 
SW\1/4\ Section 21; E\1/2\ NE\1/4\, NE\1/4\ SE\1/4\ Section 23; 
Section 29 except SE\1/4\; Section 31; S\1/2\, SE\1/4\ NW\1/4\ 
Section 33; W\1/2\ W\1/2\, NE\1/4\ NE\1/4\ Section 35.
    T.09S., R.08W. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\, W\1/2\ SW\1/4\ Section 11; Section 27 except N\1/2\ NE\1/
4\; Section 35.
    T.10S., R.05W. Willamette Meridian: SW\1/4\ NE\1/4\, W\1/2\ 
SE\1/4\, SW\1/4\, SE\1/4\ NW\1/4\ Section 29.
    T.10S., R.07W. Willamette Meridian: N\1/2\ Section 1; W\1/2\ 
NW\1/4\ Section 4; N\1/2\ Section 5.

    Critical Habitat includes only State lands described within the 
following areas:

    T.08S., R.07W. Willamette Meridian: SE\1/4\ Section 11; SE\1/4\ 
\1/4\ Section 12; N\1/2\, N\1/2\ SE\1/4\ Section 13; E\1/2\, SW\1/4\ 
Section 14.
    T.09S., R.08W. Willamette Meridian: Section 28 except N\1/2\ 
N\1/2\; S\1/2\, NW\1/4\, S\1/2\ NE\1/4\ Section 29; SE\1/4\ Section 
32; NE\1/4\ Section 33; Section 34 except NW\1/4\; Section 36 except 
N\1/2\ N\1/2\.
    T.10S., R.07W. Willamette Meridian: Section 6; N\1/2\ N\1/2\ 
Section 7; NW\1/4\, SW\1/4\, SE\1/4\ SE\1/4\, NW\1/4\ NE\1/4\ 
Section 18; Section 19 except W\1/2\ SW\1/4\.
    T.10S., R.08W. Willamette Meridian: Section 1 except SE\1/4\; 
Section 2; NE\1/4\, NW\1/4\, NW\1/4\ SW1\1/4\, SW\1/4\ SW\1/4\, 
NE\1/4\ SE\1/4\, NW\1/4\ SE\1/4\ Section 3; Section 4 except SW\1/4\ 
SE\1/4\, SE\1/4\ SW\1/4\; Section 5; E\1/2\

[[Page 26300]]

Section 6; NE\1/4\ Section 7; NE\1/4\, E\1/2\ NW\1/4\, NW\1/4\ NW\1/
4\ Section 8; NW\1/4\, NE\1/4\ NE\1/4\ Section 9; NW\1/4\, NE\1/4\ 
Section 10; N\1/2\ N\1/2\ Section 11; Section 12; Section 13 except 
S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\; Section 19; E\1/2\ NE\1/4\, N\1/2\ 
SE\1/4\ Section 24.

    Critical Habitat includes only Private lands described within the 
following areas:

    T.09S., R.08W. Willamette Meridian: S\1/2\ SW\1/4\ Section 29.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.052
    
    Map and description of OR-04-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Corvallis, Waldport and Eugene, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.11S., R.10W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 35.
    T.12S., R.09W. Willamette Meridian: N\1/2\ N\1/2\ Section 6; 
Section 7 except NW\1/4\ NE\1/4\; Section 8 except NE\1/4\ NW\1/4\, 
W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\; SE\1/4\ SE\1/4\ Section 14; S\1/2\ 
NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 15; S\1/2\, S\1/2\ N\1/2\ 
Section 16; Sections 17-18; Section 19 except W\1/2\ W\1/2\, NE\1/4\ 
NE\1/4\, SE\1/4\ SW\1/4\; Section 20 except SE\1/4\ NW\1/4\, S\1/2\ 
NE\1/4\; Section 21; Section 22 except NE\1/4\ NE\1/4\; Section 23 
except NW\1/4\ NW\1/4\; Section 26 except NE\1/4\ NE\1/4\, SE\1/4\ 
SE\1/4\; Sections 27-28; N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\ Section 29; 
W\1/2\ Section 33.
    T.12S., R.10W. Willamette Meridian: Sections 1-2; Section 3 
except E\1/2\ NW\1/4\, S\1/2\ NE\1/4\; Section 4; S\1/2\, E\1/2\ 
NE\1/4\, SW\1/4\ NW\1/4\ Section 5; SE\1/4\ SE\1/4\ Section 6; 
Sections 7-8; N\1/2\, N\1/2\ SE\1/4\ Section 9; N1\1/2\ Section 10; 
Section 11 except SW\1/4\ SW\1/4\; Section 12; W\1/2\ NE\1/4\, E\1/
2\ NW\1/4\, NE\1/4\ NE\1/4\ Section 13; Sections 16-17; Section 18; 
Sections 19-21; Section 25 except S\1/2\ S\1/2\, N\1/2\ NW\1/4\; 
S\1/2\ SE\1/4\ Section 26; Section 28; Section 29 except SW\1/4\, 
NW\1/4\ SE\1/4\; Section 30 except S\1/2\ S\1/2\; E\1/2\ SE\1/4\ 
Section 31; Section 32 except W\1/2\ NW\1/4\; Section 33 except 
SW\1/4\ SE\1/4\; N\1/2\ SE\1/4\, NE\1/4\ Section 35.
    T.12S., R.11W. Willamette Meridian: S\1/2\ NW\1/4\, S\1/2\ SW\1/
4\, NE\1/4\ SW\1/4\, W\1/2\ SE\1/4\, SW\1/4\ NE\1/4\ Section 9; 
SE\1/4\, S\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ Section 11; S\1/2\ Section 
12; Section 13 except S\1/2\ S\1/2\; Section 14 except N\1/2\ SW\1/
4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\; NE\1/4\ Section 22; Sections 
23-24; Section 25 except W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\; Section 26 
except SE\1/4\ NE\1/4\; E\1/2\ Section 27; Section 35; Section 36 
except E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\.
    T.13S., R.09W. Willamette Meridian: Section 2 except SE\1/4\; 
NE\1/4\ Section 4; SW\1/4\ Section 5; Section 6-7; W\1/2\ Section 8; 
Sections 18-19; N\1/2\ SW\1/4\, E\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ 
Section 20; SW\1/4\ SW\1/4\ Section 21; Section 28 except N\1/2\ 
NE\1/4\, NE\1/4\ NW\1/4\; Section 29 except NW\1/4\ SW\1/4\; Section 
30; Section 31 except N\1/2\ SW\1/4\, S\1/2\ NW\1/4\; Section 32-33; 
W\1/2\ W\1/2\, E\1/2\ SW\1/4\, SE\1/4\ Section 34; SW\1/4\ SE\1/4\, 
SE\1/4\ SW\1/4\ Section 35.
    T.13S., R.10W. Willamette Meridian: Section 1; Section 2; E\1/2\ 
E\1/2\ Section 3; S\1/2\ SW\1/4\, SW\1/4\ NE\1/4\, W\1/2\ SE\1/4\ 
Section 7; E\1/2\ SE\1/4\ Section 9; Section 10 except SW\1/4\ NW\1/
4\; Sections 11-15; Section 16 except N\1/2\ NW\1/4\; Section 17 
except N\1/2\, NW\1
FR Doc. 96-12647 Endangered and Threatened Wildlife and Plants; Final Designation of Critical Habitat for the Marbled Murrelet
/4\ SW\1/4\; Section 18; Sections 19-25; Section 
26 except SW\1/4\ SW\1/4\, SE\1/4\ SE\1/4\; N\1/2\ NE\1/4\, SE\1/4\ 
NE\1/4\, Section 27; SE\1/4\ SW\1/4\, NW\1/4\ Section 28; Section 
29; N\1/2\, N\1/2\ SE\1/4\, NE\1/4\ SW\1/4\, SW\1/4\ SW\1/4\ Section 
30; S\1/2\, E\1/2\ NE\1/4\ Section 31; E\1/2\ SE\1/4\, S\1/2\ SW\1/
4\, NW\1/4\ SW\1/4\, NW\1/4\, NW\1/4\ NE\1/4\ Section 32; W\1/2\ 
Section 33; E\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ NE\1/4\ Section 
34; Section 35 except SE\1/4\ NE\1/4\, NE\1/4\ NW\1/4\.
    T.13S., R.11W. Willamette Meridian: Section 1 except SE\1/4\ 
SE\1/4\; Section 2; Section 11 except W\1/2\ SW\1/4\, SE\1/4\ SW\1/
4\; NW\1/4\, W\1/2\ NE\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SE\1/4\ Section 
12; Section 13 except W\1/2\ W\1/2\, NE\1/4\ NW\1/4\, S\1/2\ SE\1/
4\; N\1/2\ N\1/2\, SW\1/4\ NW\1/4\, S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\, 
SE\1/4\ SW\1/4\ Section 14; Section 15 except N\1/2\ NW\1/4\, SW\1/
4\ NW\1/4\, NW\1/4\ SW\1/4\; NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 
22; NW\1/4\, SW\1/4\ NE\1/4\ Section 23; S\1/2\ NE\1/4\, S\1/2\, 
NW\1/4\ NW\1/4\ Section 24; Section 25 except S\1/2\ N\1/2\, N\1/2\ 
SE\1/4\; S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\, SE\1/4\ Section 26; E\1/
2\, E\1/2\ W\1/2\ Section 34; Section 35; Section 36 except SE\1/4\, 
E\1/2\ NE\1/4\.
    T.14S., R.09W. Willamette Meridian: Section 2 except NE\1/4\ 
NE\1/4\, S\1/2\ S\1/2\; Section 3 except S\1/2\ S\1/2\, N\1/2\ SW\1/
4\; Section 4 except S\1/2\ S\1/2\, N\1/2\ SE\1/4\; Section 5 except 
S\1/2\ SE\1/4\, N\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, NW\1/4\ SE\1/4\; 
E\1/2\, S\1/2\ SW\1/4\ Section 6; Section 7 except S\1/2\ SW\1/4\, 
NW\1/4\ SE\1/4\, NE\1/4\ SW\1/4\; N\1/2\ NW\1/4\, SE\1/4\, S\1/2\ 
SW\1/4\, SE\1/4\ NE\1/4\ Section 8; Section 9 except NW\1/4\ NW\1/
4\; Section 10 except N\1/2\ NE\1/4\; Section 11 except N\1/2\ NW\1/
4\, NE\1/4\, N\1/2\ SE\1/4\, SW\1/4\ SE\1/4\; S\1/2\ S\1/2\ Section 
12; SW\1/4\, S\1/2\ SE\1/4\, N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\ Section 
13; Sections 14 except NW\1/4\ NE\1/4\, SE\1/4\ NW\1/4\, N\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\; Sections 15-16; S\1/2\ NE\1/4\, N\1/2\ 
SW\1/4\, SE\1/4\ NW\1/4\, SW\1/4\ SW\1/4\ Section 18; N\1/2\ NW\1/
4\, NE\1/4\, SW\1/4\ NW\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ SW\1/4\ 
Section 19; S\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 20; N\1/2\ NE\1/
4\, NE\1/4\ NW\1/4\ Section 21; NW\1/4\ NW\1/4\ Section 22; E\1/2\, 
E\1/2\ NW\1/4\ Section 23; W\1/2\ W\1/2\ Section 24; W\1/2\, W\1/2\ 
E\1/2\ Section 25; E\1/2\ Section 26; S\1/2\ NW\1/4\, NW\1/4\ NW\1/
4\ Section 36.
    T.14S., R.10W. Willamette Meridian: Section 1 except N\1/2\ 
SE\1/4\, E\1/2\ NE\1/4\; Section 2; Section 3 except SW\1/4\; 
Section 4; Section 5 except W\1/2\ NE\1/4\, SE\1/4\ NW\1/4\; Section 
6; N\1/2\ Section 7; Section 8 except SW\1/4\; Section 9 except S\1/
2\ SW\1/4\; Sections 10-13; Section 14; Section 15; N\1/2\, N\1/2\ 
SE\1/4\, SE\1/4\ SE\1/4\, NE\1/4\ SW\1/4\ Section 16; Section 17 
except N\1/2\ NW\1/4\; N\1/2\ Section 20; E\1/2\, E\1/2\ NW\1/4\, 
NW\1/4\ SW\1/4\ Section 23; Section 24 except E\1/2\ NE\1/4\, NE\1/
4\ SE\1/4\; NW\1/4\ Section 25.
    T.14S., R.11W. Willamette Meridian: Sections 1-2; SE\1/4\ NW\1/
4\, SW\1/4\ SE\1/4\; Section 3; N\1/2\ NE\1/4\, NE\1/4\ NW\1/4\, 
W\1/2\ NW\1/4\ Section 4; S\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, SW\1/4\ 
SE\1/4\, NE\1/4\, S\1/2\ SW\1/4\ Section 5; NE\1/4\, SE\1/4\ NW\1/4\ 
Section 6; Section 7; Section 8 except NE\1/4\ NE\1/4\; S\1/2\ SE\1/
4\, NE\1/4\ SE\1/4\, SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\ Section 9; 
Section 10 except W\1/2\ W\1/2\, NE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\, 
NE\1/4\ NE\1/4\; Section 11; W\1/2\, NW\1/4\ NE\1/4\ Section 12; 
W\1/2\ W\1/2\, NE\1/4\ NW\1/4\ Section 13; Section 14; Section 15 
except NE\1/4\ SE\1/4\; Section 16 except NW\1/4\ NW\1/4\; Section 
17 except SE\1/4\ NE\1/4\; Sections 18-21; Section 22 except S\1/2\ 
N\1/2\, N\1/2\ SW\1/4\, N\1/2\ NE\1/4\; Section 23; Section 24 
except NE\1/4\; Section 25 except W\1/2\ NW\1/4\; Section 26 except 
NE\1/4\ NE\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SW\1/4\; Sections 27-30; 
N\1/2\, NE\1/4\ SW\1/4\ Section 31; NW\1/4\, N\1/2\ NE\1/4\, N\1/2\ 
SW\1/4\ Section 32; N\1/2\ Section 33; N\1/2\ N\1/2\, SW\1/4\ NW\1/
4\ Section 34; N\1/2\ NW\1/4\ Section 35.
    T.14S., R.12W. Willamette Meridian: S\1/2\ SE\1/4\, SE\1/4\ 
SW\1/4\ Section 1; Section 12 except W\1/2\ W\1/2\; Section 13 
except NW\1/4\ NW\1/4\; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 14; 
SE\1/4\, E\1/2\ NE\1/4\, W\1/2\ SW\1/4\ Section 23; Sections 24-25.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.14S., R.09W. Willamette Meridian: E\1/2\ NW\1/4\, W\1/2\ NE\1/
4\ Section 8.
[GRAPHIC] [TIFF OMITTED] TR24MY96.053

    Map and description of OR-04-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Waldport, Eugene, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

[[Page 26301]]

    T.14S., R.09W. Willamette Meridian: SE\1/4\, S\1/2\ SW\1/4\, 
NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\ Section 28; Section 29 except N\1/
2\ NE\1/4\; S\1/2\, S\1/2\ N\1/2\ Section 30; Section 31; Section 
32; Section 33 except SE\1/4\ NE\1/4\, NE\1/4\ SW\1/4\; Section 34 
except W\1/2\ NW\1/4\, W\1/2\ NE\1/4\; S\1/2\ S\1/2\, SW\1/4\ NW\1/
4\, E\1/2\ NW\1/4\, N\1/2\ SW\1/4\ Section 35.
    T.14S., R.10W. Willamette Meridian: SE\1/4\ NE\1/4\, E\1/2\ 
SE\1/4\ Section 25; Section 29 except NE\1/4\ NE\1/4\; Sections 30-
32.
    T.14S., R.11W. Willamette Meridian: SE\1/4\, S\1/2\ SW\1/4\ 
Section 35; Section 36 except NW\1/4\, N\1/2\ NE\1/4\.
    T.15S., R.09W. Willamette Meridian: W\1/2\ W\1/2\ Section 1; 
Sections 2-5; Section 6 except S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\; E\1/
2\ NE\1/4\, SW\1/4\ NE\1/4\, SW\1/4\, W\1/2\ SE\1/4\, W\1/2\ NW\1/4\ 
Section 7; N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\, E\1/2\ SE\1/4\, SW\1/4\ 
SE\1/4\, SE\1/4\ SW\1/4\ Section 8; Section 9 except S\1/2\ SW\1/4\; 
Section 10 except SE\1/4\; Section 11; N\1/2\ SW\1/4\, S\1/2\ NW\1/
4\, NW\1/4\ NW\1/4\ Section 12; E\1/2\, E\1/2\ SW\1/4\, SW\1/4\ 
SW\1/4\, NW\1/4\ NW\1/4\, SE\1/4\ NW\1/4\ Section 13; Section 14 
except NE\1/4\ SE\1/4\; Section 15; E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, 
S\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, SE\1/4\, E\1/2\ SW\1/4\ Section 16; 
E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, W\1/2\ SW\1/4\ Section 17; Section 
18 except NE\1/4\ NE\1/4\; Section 19; SE\1/4\, NW\1/4\ NW\1/4\, 
S\1/2\ NE\1/4\ Section 20; Section 21; Section 22 except E\1/2\ 
SW\1/4\; Sections 23-26; E\1/2\, E\1/2\ SW\1/4\, SW\1/4\ SW\1/4\, 
SE\1/4\ NW\1/4\ Section 27; Section 28; E\1/2\, E\1/2\ NW\1/4\, 
SE\1/4\ SW\1/4\ Section 29; N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\ Section 
30; Section 32 except W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\; Sections 33-
36.
    T.15S., R.10W. Willamette Meridian: Section 1 except N\1/2\ 
NW\1/4\, SE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\, SE\1/4\; E\1/2\ SE\1/4\ 
Section 2; W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 4; Sections 5-8; 
W\1/2\, W\1/2\ SE\1/4\, SW\1/4\ NE\1/4\ Section 9; NE\1/4\ NE\1/4\ 
Section 11; NW\1/4\, E\1/2\ Section 12; E\1/2\ NE\1/4\, NW\1/4\ 
NE\1/4\, S\1/2\ SW\1/4\ Section 13; SW\1/4\, SW\1/4\ NW\1/4\, SE\1/
4\ SE\1/4\ Section 14; SW\1/4\ SW\1/4\, E\1/2\ SW\1/4\, E\1/2\ NW\1/
4\, E\1/2\ Section 15; S\1/2\ S\1/2\ Section 16; Sections 17-22; 
E\1/2\, SE\1/4\ SW\1/4\, NW\1/4\ NW\1/4\ Section 23; Section 24 
except NE\1/4\ NE\1/4\, SW\1/4\ SE\1/4\; SW\1/4\ Section 25; Section 
26 except NE\1/4\; Sections 27-34; E\1/2\, N\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, NE\1/4\ SW\1/4\ Section 35; NE\1/4\ NW\1/4\ Section 36.
    T.15S., R.11W. Willamette Meridian: Section 1; N\1/2\ N\1/2\, 
SE\1/4\ NE\1/4\, SW\1/4\ SW\1/4\, SE\1/4\ SE\1/4\ Section 2; E\1/2\ 
SE\1/4\, SW\1/4\ SE\1/4\, S\1/2\ SW\1/4\ Section 3; Section 4 except 
N\1/2\ NW\1/4\; NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\ Section 5; SW\1/4\, 
W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, S\1/2\ NE\1/4\, SE\1/4\ Section 6; 
W\1/2\ Section 7; NE\1/4\, S\1/2\ NW\1/4\, NE\1/4\ SW\1/4\, N\1/2\ 
SE\1/4\, NE\1/4\ NW\1/4\ Section 8; Section 9 except SW\1/4\ SW\1/
4\, NW\1/4\ NE\1/4\, NE\1/4\ NW\1/4\; Section 10-11; Section 12 
except SE\1/4\ SW\1/4\; Section 13 except N\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\; Section 14; Section 15 except SW\1/4\; NE\1/4\ NE\1/4\ 
Section 16; E\1/2\ SE\1/4\ Section 21; E\1/2\ E\1/2\, W\1/2\ SE\1/
4\, SW\1/4\ Section 22; Sections 23-27; Section 28 except N\1/2\ 
N\1/2\; S\1/2\, SE\1/4\ NE\1/4\ Section 29; S\1/2\, S\1/2\ NW\1/4\, 
SW\1/4\ NE\1/4\ Section 30; Section 31 except N\1/2\ NW\1/4\, NW\1/
4\ NE\1/4\, SE\1/4\ NE\1/4\; Section 32 except S\1/2\ N\1/2\, NE\1/
4\ SE\1/4\; Section 33 except S\1/2\ SE\1/4\; Section 34 except S\1/
2\ S\1/2\, NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; Section 35 except SW\1/
4\ NW\1/4\, NW\1/4\ NE\1/4\, NW\1/4\ SW\1/4\, S\1/2\ SW\1/4\; 
Section 36.
    T.15S., R.12W. Willamette Meridian: Section 1 except NW\1/4\; 
Section 2; E\1/2\, E\1/2\ NW\1/4\ Section 3; N\1/2\ NE\1/4\, SE\1/4\ 
NE\1/4\, NE\1/4\ NW\1/4\ Section 10; Section 11 except SE\1/4\ SE\1/
4\; Section 12 except S\1/2\ S\1/2\; SE\1/4\ Section 22; Section 25 
except NE\1/4\ NE\1/4\; S\1/2\, NE\1/4\, S\1/2\ NW\1/4\ Section 26; 
E\1/2\ E\1/2\ Section 27; E\1/2\ Section 34; Section 35; Section 36 
except N\1/2\ N\1/2\.
    T.16S., R.09W. Willamette Meridian: Section 1 except N\1/2\ S\1/
2\, SE\1/4\ SE\1/4\; Section 2 except E\1/2\ SE\1/4\; Sections 3-5; 
Section 6 except N\1/2\ N\1/2\, SW\1/4\ NE\1/4\; Section 7 except 
E\1/2\ NE\1/4\; Sections 8-15; Section 16 except SE\1/4\; Section 
17; Section 18 except SW\1/4\ SW\1/4\; Section 19; NW\1/4\ NW\1/4\, 
NW\1/4\ SW\1/4\, N\1/2\ NE\1/4\ Section 20; Section 21 except SW\1/
4\ SW\1/4\; Sections 22-24; N\1/2\ NW\1/4\, NW\1/4\ SW\1/4\, W\1/2\ 
NE\1/4\, SW\1/4\ NW\1/4\ Section 25; Section 26 except S\1/2\ SE\1/
4\; Sections 27-28; Section 29 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/
4\; Section 30; W\1/2\ Section 31; Sections 32-34; Section 35 except 
NE\1/4\, S\1/2\ SW\1/4\, E\1/2\ NW\1/4\.
    T.16S., R.10W. Willamette Meridian: SE\1/4\, S\1/2\ NE\1/4\ 
Section 1; SW\1/4\ SE\1/4\, SW\1/4\ Section 2; Section 3 except E\1/
2\ NE\1/4\, NE\1/4\ SE\1/4\, NW\1/4\ SW\1/4\; SW\1/4\, NW\1/4\ NW\1/
4\, S\1/2\ SE\1/4\, NE\1/4\ NE\1/4\ Section 4; Section 5 except 
SE\1/4\ NE\1/4\; Sections 6-9; Section 10 except SE\1/4\ NE\1/4\, 
SW\1/4\ SW\1/4\; N\1/2\, NW\1/4\ SE\1/4\, NE\1/4\ SE\1/4\, SW\1/4\ 
SW\1/4\ Section 11; Section 12 except SW\1/4\ NE\1/4\, NW\1/4\; 
Section 13 except S\1/2\ SE\1/4\, SE\1/4\ SW\1/4\; Section 14; 
Section 15 except W\1/2\ W\1/2\, SE\1/4\ SW\1/4\, NE\1/4\ NW\1/4\; 
Section 16 except N\1/2\ NE\1/4\, S\1/2\ SE\1/4\; Section 17-21; 
Section 22 except W\1/2\ E\1/2\, NE\1/4\ NE\1/4\; Section 23; 
Section 24 except NW\1/4\ NE\1/4\, E\1/2\ NW\1/4\, NE\1/4\ SW\1/4\; 
N\1/2\ NW\1/4\, NE\1/4\ NE\1/4\, E\1/2\ SE\1/4\, W\1/2\ SW\1/4\ 
Section 25; Section 26 except S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\; 
Section 27 except S\1/2\ NE\1/4\, E\1/2\ SE\1/4\, NW\1/4\ SE\1/4\; 
Section 28; Section 29 except SW\1/4\ SE\1/4\, SE\1/4\ SW\1/4\; 
Section 30 except NW\1/4\ SE\1/4\, NE\1/4\ SW\1/4\; Section 31; 
Section 32 except N\1/2\ N\1/2\; Section 33 except W\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\; NW\1/4\ NE\1/4\, 
NW\1/4\, W\1/2\ SW\1/4\ Section 34; NE1/4 Section 35.
    T.16S., R.11W. Willamette Meridian: E\1/2\, E\1/2\ NW\1/4\ 
Section 1; Section 2 except SW\1/4\ NW\1/4\; W\1/2\ Section 3; 
Section 4-6; N\1/2\ N\1/2\, S\1/2\ NE\1/4\ Section 8; N\1/2\ Section 
9; Section 10 except SE\1/4\ SE\1/4\; Section 11 except S\1/2\ SW\1/
4\, SW\1/4\ SE\1/4\; Section 12 except NE\1/4\ NW\1/4\; Section 13; 
Section 14 except N\1/2\ NW\1/4\; S\1/2\ NE\1/4\, SE\1/4\ Section 
15; Section 19 except N\1/2\ N\1/2\, SE\1/4\ NE\1/4\, NE\1/4\ SE\1/
4\; S\1/2\ SW\1/4\, NE\1/4\ SE\1/4\, W\1/2\ SE\1/4\ Section 20; S\1/
2\ SE\1/4\, SW\1/4\ Section 21; Section 22 except NW\1/4\ NW\1/4\; 
Sections 23-27; Section 28 except NW\1/4\ NW\1/4\; Section 29 except 
NE\1/4\ NE\1/4\; Sections 30-36.
    T.16S., R.12W. Willamette Meridian: Sections 1 except S\1/2\ 
S\1/2\; Section 2; E\1/2\ Section 3; NE\1/4\, N\1/2\ SE\1/4\, SW\1/
4\ SE\1/4\, E\1/2\ SW\1/4\ Section 10; N\1/2\ Section 11; S\1/2\ 
S\1/2\ Section 14; W\1/2\, SE\1/4\ SE\1/4\ Section 15; N\1/2\ NE\1/
4\ Section 22; Section 23 except N\1/2\ NE\1/4\; Sections 24-26; 
Sections 35-36.
    T.17S., R.08W. Willamette Meridian: N\1/2\ SE\1/4\ Section 18.
    T.17S., R.09W. Willamette Meridian: Section 1 except E\1/2\ 
SE\1/4\, SW\1/4\ SE\1/4\; Section 2 except E\1/2\ W\1/2\, S\1/2\ 
NE\1/4\; Section 3 except S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ 
NE\1/4\; Section 4 except S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\; Section 
5; Section 6 except NW\1/4\; Section 7; Section 8; W\1/2\ Section 9; 
N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\ Section 10; W\1/2\ NE\1/4\, E\1/2\ 
NW\1/4\, NE\1/4\ NE\1/4\, S\1/2\ SW\1/4\ Section 11; SE\1/4\ SE\1/4\ 
Section 14; W\1/2\ W\1/2\ Section 16; Section 17 except W\1/2\ SE\1/
4\, SE\1/4\ SW\1/4\; Sections 18-19; Section 20 except E\1/2\ E\1/
2\, NW\1/4\ NE\1/4\; NW\1/4\ NW\1/4\ Section 21; S\1/2\ SW\1/4\ 
Section 25; S\1/2\ SE\1/4\ Section 26; W\1/2\ NW\1/4\ Section 28; 
N\1/2\ Section 29; N\1/2\ N\1/2\, W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\, 
SE\1/4\ SW\1/4\ Section 30; Section 31 except S\1/2\ NE\1/4\, NE\1/
4\ SE\1/4\; E\1/2\ NE\1/4\, NW\1/4\ NE\1/4\, S\1/2\ SE\1/4\, SW\1/4\ 
NW\1/4\ Section 32; S\1/2\ SE\1/4\ Section 33; S\1/2\ S\1/2\, N\1/2\ 
SE\1/4\ Section 34; S\1/2\ SE\1/4\, SE\1/4\ SW\1/4\ Section 35.
    T.17S., R.10W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 1; 
Section 3 except E\1/2\, NE\1/4\ NW\1/4\; Section 4; Section 5 
except SW\1/4\ NW\1/4\; Section 6 except S\1/2\ NE\1/4\, NW\1/4\ 
SE\1/4\; Section 7-9; N\1/2\, NW\1/4\ SE\1/4\, W\1/2\ SW\1/4\ 
Section 10; SW\1/4\ NW\1/4\ Section 11; E\1/2\ E\1/2\, NE\1/4\ NW\1/
4\, NW\1/4\ NE\1/4\, SW\1/4\ SE\1/4\, S\1/2\ SW\1/4\ Section 12; 
Section 13; S\1/2\, SE\1/4\ NE\1/4\, SW\1/4\ NW\1/4\ Section 14; 
SE\1/4\, NW\1/4\ NW\1/4\, SE\1/4\ NE\1/4\ Section 15; Section 16 
except W\1/2\ NE\1/4\, NE\1/4\ SE\1/4\; Sections 17-18; Section 19 
except SW\1/4\ NW\1/4\, SW\1/4\ SE\1/4\, S\1/2\ SW\1/4\; Section 20-
21; Section 22 except N\1/2\ NW\1/4\; Section 23 except N\1/2\ SW\1/
4\, S\1/2\ SE\1/4\; NW\1/4\, N\1/2\ NE\1/4\, N\1/2\ SW\1/4\ Section 
24; Section 25 except N\1/2\ NE\1/4\; Section 26; Section 27 except 
SW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\, NE\1/4\ NW\1/4\; Section 28 except 
SE\1/4\ SE\1/4\; Section 29 except S\1/2\ SW\1/4\; Sections 30-31; 
Section 32 except N\1/2\ NW\1/4\, NE\1/4\ NW\1/4\ ; Section 33 
except NE\1/4\ NE\1/4\; NE\1/4\, SW\1/4\, SW\1/4\ NW\1/4\, SW\1/4\ 
SE\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ NW\1/4\ Section 34; Section 35 
except SW\1/4\ SW\1/4\, SW\1/4\ SE\1/4\.
    T.17S., R.11W. Willamette Meridian: Section 1 except SE\1/4\ 
SW\1/4\, S\1/2\ SE\1/4\; Section 2; S\1/2\, E\1/2\ NE\1/4\, NW\1/4\ 
NW\1/4\, S\1/2\ NW\1/4\ Section 3; Sections 4-5; Section 6 except 
S\1/2\ SE\1/4\; S\1/2\ NE\1/4\, S\1/2\, NE\1/4\ NW\1/4\, S\1/2\ 
NW\1/4\ Section 7; Sections 8-9; NW\1/4\, NW\1/4\ SW\1/4\ Section 
10; Section 11 except SE\1/4\ NW\1/4\, W\1/2\ NW\1/4\, SW\1/4\; 
Section 12; SE\1/4\ NE\1/4\, N\1/2\ N\1/2\ Section 13; NE\1/4\ NE\1/
4\, SW\1/4\ SE\1/4\, E\1/2\ SW\1/4\ Section 14; Section 16 except 
E\1/2\ E\1/2\; W\1/2\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ Section 17; 
Section 18; Section 19 except NW\1/4\ NW\1/4\, SW\1/4\ SW\1/4\; 
Section 20; W\1/2\, SW\1/4\ NE\1/4\, NW\1/4\ SE\1/4\ Section 21; 
E\1/2\ NE\1/4\ Section 22; NW\1/4\, W\1/2\ NE\1/4\, N\1/2\ S\1/2\ 
Section 23; SE\1/4\ SE\1/4\ Section 24; Section 25 except N\1/2\ 
NW\1/4\; E\1/2\ SE\1/4\ Section 26; W\1/2\ Section 28; Section 29; 
S\1/2\ NW\1/4\, NE\1/4\, N\1/2\ SE\1/4\, E\1/2\ SW\1/4\, NE\1/4\ 
NW\1/4\ Section 30; Section 31 except NW\1/4\, NW\1/4\ NE\1/4\, 
NW\1/4\ SW\1/4\; Section 32; W\1/2\ Section 33; SE\1/4\, SE\1/4\ 
NE\1/4\ Section 34; Section 35 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/
4\; Section 36.
    T.17S., R.12W. Willamette Meridian: Section 1; Section 2 except 
W\1/2\ NW\1/4\; SE\1/4\, NE\1/4\ SW\1/4\ Section 3; NE\1/4\, NE\1/4\ 
SE\1/4\ Section 10; N\1/2\ Section 11; Section 12 except S\1/2\ 
SW\1/4\, NW\1/4\ SW\1/4\; E\1/2\ Section 13; E\1/2\ NE\1/4\, E\1/2\ 
SE\1/4\, NW\1/4\ SE\1/4\ Section 24.
    T.18S., R.09W. Willamette Meridian: W\1/2\ NE\1/4\, E\1/2\ NW\1/
4\, NW\1/4\ NW\1/4\ Section 1; Section 2 except S\1/2\ SE\1/4\, 
NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; Section 3; Section 4 except W\1/2\ 
SW\1/4\; N\1/2\ NE\1/4\ Section 5; N\1/2\ NE\1/4\, NE\1/4\ SE\1/4\, 
SE\1/4\ NE\1/4\ Section 7; Section 8 except S\1/2\ S\1/2\, N\1/2\ 
NW\1/4\; N\1/2\ N\1/2\, SW\1/4\ NE\1/4\ Section 9; E\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\ Section 10; NE\1/4\ NW\1/4\ Section 11.

[[Page 26302]]

    T.18S., R.10W. Willamette Meridian: N\1/2\ NE\1/4\, SW\1/4\ 
NE\1/4\, NE\1/4\ NW\1/4\ Section 4; N\1/2\ NE\1/4\, NW\1/4\, W\1/2\ 
SW\1/4\ Section 5; Section 6; N\1/2\ NE\1/4\ Section 7; NW\1/4\ 
NW\1/4\ Section 8.
    T.18S., R.11W. Willamette Meridian: Section 1 except SW\1/4\ 
SW\1/4\, SE\1/4\ SE\1/4\; N\1/2\, NW\1/4\ SE\1/4\ Section 2; NE\1/
4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 3; NW\1/4\ NW\1/4\ 
Section 4; W\1/2\ NW\1/4\, NE\1/4\ NE\1/4\, NE\1/4\ NW\1/4\ Section 
5; Section 6 except SW\1/4\ SW\1/4\.

    Critical Habitat includes only State lands described within the 
following areas:

    T.17., R.08W. Willamette Meridian: S\1/2\ SE\1/4\, NE\1/4\ SE\1/
4\ Section 18; NE\1/4\, NW\1/4\ SE\1/4\ Section 19.
    T.17., R.09W. Willamette Meridian: N\1/2\ SW\1/4\, SW\1/4\ NE\1/
4\, S\1/2\ NW\1/4\ Section 25; SE\1/4\ NE\1/4\, N\1/2\ SE\1/4\ 
Section 26; Section 32 except N\1/2\ S\1/2\, E\1/2\ NE\1/4\, SW\1/4\ 
NW\1/4\; S\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\, NE\1/4\ 
SW\1/4\, S\1/2\ SW\1/4\ Section 33.
    T.18S., R.09W. Willamette Meridian: W\1/2\ SW\1/4\ Section 4; 
SE\1/4\, S\1/2\ NE\1/4\, N\1/2\ NW\1/4\ Section 5; N\1/2\ SE\1/4\, 
SE\1/4\ NE\1/4\ Section 9.
[GRAPHIC] [TIFF OMITTED] TR24MY96.054

    Map and description of OR-04-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Reedsport, Eugene and Cottage Grove, 
Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.18S., R.09W. Willamette Meridian: SE\1/4\ Section 23; Section 
25; S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ SE\1/4\ Section 26; 
Section 27 except N\1/2\, NW\1/4\ SW\1/4\; S\1/2\ SE\1/4\ Section 
28; S\1/2\ Section 32; Section 33 except NW\1/4\ NW\1/4\; Sections 
34-36.
    T.18S., R.10W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 8; 
Section 9 except NE\1/4\ SE\1/4\, N\1/2\; NW\1/4\ NW\1/4\ Section 
10; Section 15 except N1/2 NE\1/4\, SE\1/4\ NE\1/4\; SW\1/4\ SW\1/4\ 
Section 16; Section 17 except NE1/4 NE\1/4\; Section 18; Sections 
19-20; E\1/2\ NE\1/4\, SW\1/4\ NW\1/4\ Section 21; Section 22 except 
E\1/2\ NE\1/4\, NW\1/4\ NE\1/4\, NE\1/4\ SE\1/4\; Section 23 except 
NE\1/4\, N\1/2\ NW\1/4\, NW\1/4\ SE\1/4\; Section 25; Section 26; 
Section 27 except SE\1/4\ SW\1/4\, N\1/2\ SW\1/4\; W\1/2\ W\1/2\, 
E\1/2\ E\1/2\ Section 28; Section 29-32; Section 33 except E\1/2\ 
W\1/2\, NW\1/4\ SW\1/4\, SW\1/4\ SE\1/4\; Section 34 except SW\1/4\, 
NE\1/4\ NW\1/4\, S\1/2\ NW\1/4\, NW\1/4\ SE\1/4\; Section 35 except 
NE\1/4\ NW\1/4\.
    T.18S., R.11W. Willamette Meridian: S\1/2\ S\1/2\ Section 11; 
S\1/2\ S\1/2\ Section 12; Section 13; Section 14 except NW\1/4\ 
NW\1/4\; Section 22 except N\1/2\ NW\1/4\, SW\1/4\ SW\1/4\; Sections 
23-26; E\1/2\, E\1/2\ NW\1/4\ Section 27; S\1/2\ SW\1/4\, W\1/2\ 
SE\1/4\ Section 28; SE\1/4\, NE\1/4\ NE\1/4\, S\1/2\ NE\1/4\ Section 
29; NE\1/4\ NE\1/4\ Section 32; Section 33-36.
    T.19S., R.09W. Willamette Meridian: Sections 1-2; Section 3 
except S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\; Section 4; Section 5 except 
NE\1/4\ SW\1/4\; Section 6 except N\1/2\ NW\1/4\, E\1/2\ SE\1/4\, 
S\1/2\ SW\1/4\; Section 7 except N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\, 
W\1/2\ SW\1/4\; Sections 8-9; E\1/2\ Section 11; E\1/2\ NW\1/4\, 
NE\1/4\ Section 12; Section 13; Section 15; Section 17; Section 18 
except W\1/2\ SW\1/4\; Sections 19-23; Section 24 except S\1/2\ 
SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; Section 25; N1/2 N1/2, 
SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, S\1/2\ SE\1/4\ Section 26; Sections 
27-33; N\1/2\ NE\1/4\, W\1/2\ W\1/2\ Section 34; Section 35; Section 
36 except E\1/2\ NW\1/4\, W\1/2\ NE\1/4\, NE\1/4\ SW\1/4\.
    T.19S., R.10W. Willamette Meridian: Section 1; Section 2 except 
W\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; Section 3; Section 4 except S\1/2\ 
SE\1/4\; Sections 5-8; Section 9 except E\1/2\ NE\1/4\; Section 10 
except N\1/2\ N\1/2\, SW\1/4\ NW\1/4\, SE\1/4\ NE\1/4\; Section 11 
except N\1/2\ N\1/2\, SW\1/4\ NW\1/4\; Section 12 except E\1/2\ 
SE\1/4\; Section 13 except S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\; Sections 
14-23; Section 24 except N\1/2\ NE\1/4\, NE\1/4\ NW\1/4\; Sections 
25-26; Section 27 except SE\1/4\ SE\1/4\; Section 28; Section 29 
except W\1/2\ SW\1/4\; N\1/2\ Section 30; E\1/2\ SE\1/4\ Section 31; 
Section 32 except S\1/2\ SE\1/4\, SE\1/4\ SW\1/4\; Section 33-36.
    T.19S., R.11W. Willamette Meridian: Section 1; N\1/2\ N\1/2\, 
W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ Section 2; Section 3 except SW\1/4\ 
SW\1/4\; Section 4; Section 9 except E\1/2\ NE\1/4\, S\1/2\ SW\1/4\, 
NW\1/4\ SW\1/4\, SE\1/4\, SE\1/4\ SE\1/4\; Section 10 except S\1/2\, 
W\1/2\ NW\1/4\; Section 12 except N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\; 
Section 13; E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\ Section 14; SW\1/4\ 
SE\1/4\, SW\1/4\ Section 15; SE\1/4\ SE\1/4\ Section 16; Section 21 
except N\1/2\ NW\1/4\; Section 22 except E\1/2\ NE\1/4\; Section 23 
except S1/2 SW\1/4\; Section 24; NE\1/4\, N\1/2\ NW\1/4\ Section 25; 
NE\1/4\ NE\1/4\ Section 26; N\1/2\, W\1/2\ SW\1/4\ Section 27; 
Section 28 except NE\1/4\ SW\1/4\; N\1/2\ NE\1/4\, SE\1/4\ NW\1/4\, 
SW\1/4\ NE\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ SW\1/4\ Section 33.
    T.20S., R.09W. Willamette Meridian: Section 1 except SE\1/4\ 
SW\1/4\; Section 2 except SW\1/4\ SW\1/4\; Section 3 except S\1/2\ 
SE\1/4\; Sections 4-6; Section 7 except W\1/2\ W\1/2\; Section 8; 
Section 9 except SE\1/4\ SE\1/4\; SE\1/4\, S\1/2\ NW\1/4\ Section 
10; Section 11 except NW\1/4\ NW\1/4\; Section 12 except NE\1/4\ 
NW\1/4\, NW\1/4\ SW\1/4\; N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\ Section 
13; NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 14.
    T.20S., R.10W. Willamette Meridian: N\1/2\ Section 1; N\1/2\ 
NW\1/4\ Section 5; Section 6 except NW\1/4\ NW\1/4\; W\1/2\, N\1/2\ 
NE\1/4\, NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 7; Section 18 
except SE\1/4\ SW\1/4\, E\1/2\ SE\1/4\; SW\1/4\, NW\1/4\ SE\1/4\, 
W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\ Section 19; W\1/2\ 
Section 30.
    T.20S., R.11W. Willamette Meridian: Section 10 except S\1/2\ 
SW\1/4\, NW\1/4\ SW\1/4\; Sections 11-14; E\1/2\ Section 15; NE\1/4\ 
Section 22; Section 23 except SW\1/4\; Section 24-25; NE\1/4\, E\1/
2\ SE\1/4\ Section 26; N\1/2\ SE\1/4\, S\1/2\ NE\1/4\ Section 35; 
NW\1/4\, N\1/2\ NW\1/4\, N\1/2\ NE\1/4\ Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.055

    Map and description of OR-04-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Reedsport and Cottage Grove, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.20S., R.10W. Willamette Meridian: S\1/2\ Section 11; W\1/2\ 
SW\1/4\ Section 12; NW\1/4\ SW\1/4\ Section 13; NE\1/4\, N\1/2\ 
SE\1/4\, N\1/2\ NW\1/4\ Section 14; SE\1/4\ SE\1/4\ Section 22; W\1/
2\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\, W\1/2\ NE\1/4\ Section 23; 
SW\1/4\ NW\1/4\ Section 25; Section 26; Section 27 except W\1/2\ 
W\1/2\, E\1/2\ SW\1/4\; NE\1/4\ Section 34; Section 35.
    T.21S., R.09W. Willamette Meridian: S\1/2\ SW\1/4\, NE\1/4\ 
SW\1/4\ Section 2; Section 3 except NW\1/4\ NE\1/4\; E\1/2\ E\1/2\, 
NE\1/4\ SW\1/4\, SW\1/4\ SW\1/4\ Section 5; SE\1/4\, SW\1/4\ NE\1/
4\, E\1/2\ SW\1/4\, SE\1/4\ NW\1/4\ Section 6; Sections 7-8; Section 
9 except S\1/2\ NE\1/4\; SW\1/4\, SE\1/4\ NW\1/4\ Section 10; 
Section 11; Section 14 except E\1/2\ E\1/2\; Section 15; Sections 
17-19; NW\1/4\ Section 20; Section 21; W\1/2\ NE\1/4\ Section 22; 
Section 23; Section 29; Sections 31-33.
    T.21S., R.10W. Willamette Meridian: Section 2-3; NE\1/4\ NE\1/4\ 
Section 4; SW\1/4\, S\1/2\ SE\1/4\, S\1/2\ NW\1/4\ Section 6; 
Section 7; Section 8 except NE\1/4\; W\1/2\ SW\1/4\ Section 9; N\1/
2\ E\1/2\ Section 10; Sections 11-14; Section 15 except W\1/2\ NW\1/
4\; NW\1/4\ NW\1/4\ Section 16; Sections 17-21; Section 22 except 
NW\1/4\; Sections 23-35.
    T.21S., R.11W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 1; 
E\1/2\ NE\1/4\ Section 12; S\1/2\ NE\1/4\, S\1/2\ SW\1/4\, NW\1/4\, 
S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ Section 23; Sections 24-25; Section 
26 except N\1/2\ NW\1/4\; Section 27 except N\1/2\ N\1/2\; Section 
28 except N\1/2\ N\1/2\, N\1/2\ SW\1/4\; NW\1/4\, N\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\ Section 33; N\1/2\, N\1/2\ SE\1/4\ Section 34; 
Section 35 except S\1/2\ NW\1/4\, SW\1/4\, S\1/2\ SE\1/4\; Section 
36 except SW\1/4\ SW\1/4\.
    T.22S., R.09W. Willamette Meridian: NE\1/4\ NE\1/4\, N\1/2\ 
NW\1/4\, SW\1/4\ NW\1/4\, SW\1/4\ Section 4; Section 5 except SW\1/
4\, S\1/2\ NW\1/4\; Section 6 except SE\1/4\, S\1/2\ NE \1/4\; 
Section 7

[[Page 26303]]

except E\1/2\ SE\1/4\; Section 9 W\1/2\ SW\1/4\; NW\1/4\ SW\1/4\, 
NW\1/4\ NW\1/4\ Section 17.
    T.22S., R.10W. Willamette Meridian: Sections 1-5; E\1/2\ Section 
6; Section 8 except W\1/2\ W\1/2\; Sections 9-12; N\1/2\ Section 13; 
N\1/2\ N\1/2\, SE\1/4\ NE\1/4\, SW\1/4\ NW\1/4\, NE\1/4\ SE\1/4\ 
Section 14; NW\1/4\, W\1/2\ NE\1/4\, NW\1/4\ SW\1/4\ Section 15; 
NE\1/4\ Section 17.
    T.22S., R.11W. Willamette Meridian: NE\1/4\ Section 1.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.22S., R.11W. Willamette Meridian: SE\1/4\ NE\1/4\ Section 1.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.056
    
    Map and description of OR-04-e taken from United States Fish and 
Wildlife Service 1:100,000 map; Cottage Grove and Roseburg, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.23S., R.08W. Willamette Meridian: Section 3 except NW\1/4\ 
NW\1/4\; Section 5; S\1/2\, SE\1/4\ NE\1/4\, SW\1/4\ NW\1/4\ Section 
6; Section 7; Section 9; NW\1/4\, S\1/2\ S\1/2\, NW\1/4\ SW\1/4\ 
Section 11; Section 13 except N\1/2\ NE\1/4\; Section 14 except N\1/
2\ NE\1/4\, NE\1/4\ NW\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, S\1/2\ 
SE\1/4\; Section 15; Section 17-19; Section 20 except N\1/2\ NE\1/
4\, SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\; Section 21; Section 23 except 
S\1/2\ NE\1/4\, SW\1/4\ NW\1/4\; Section 27; Section 28 except N\1/
2\ NE\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ NW\1/4\; Sections 29-33; 
Section 35 except E\1/2\ NE\1/4\.
    T.23S., R.09W. Willamette Meridian: Section 3 except NE\1/4\; 
Sections 7-8; Section 13 except NE\1/4\ SW\1/4\, NW\1/4\ SE\1/4\; 
Sections 14-17; Section 20 except S\1/2\ N\1/2\; Sections 21-22; 
N\1/2\ Section 23; Sections 24-25; Section 26 except NW\1/4\; 
Section 27; Section 28 except E\1/2\ SE\1/4\; Section 29.
    T.23S., R.10W. Willamette Meridian: Section 1.
    T.24S., R.07W. Willamette Meridian: SE\1/4\ NW\1/4\ Section 6; 
Section 7; E\1/2\ Section 18; Section 19 except E\1/2\ E\1/2\, SW\1/
4\ SE\1/4\.
    T.24S., R.08W. Willamette Meridian: Section 1; Section 3; E\1/
2\, E\1/2\ SW\1/4\ Section 9; Sections 10-11; Section 13; Section 
15; SW\1/4\ NE\1/4\, SE\1/4\ Section 17; Section 20 except NW\1/4\; 
Section 21; SE\1/4\ Section 22; Section 23; Section 25; Sections 27-
29; Section 33; Section 35.
    T.25S., R.07W. Willamette Meridian: S\1/2\ S\1/2\, NW\1/4\ SE\1/
4\ Section 6; S\1/2\ S\1/2\ Section 7; S\1/2\ SW\1/4\ Section 9; 
NW\1/4\ NW\1/4\ Section 15; Section 17; Section 18 except W\1/2\ 
W\1/2\; Section 19; NE\1/4\ NW\1/4\ Section 20; S\1/2\ S\1/2\, NW\1/
4\ SE\1/4\ NE\1/4\ SW\1/4\ Section 21; Section 27 except NE\1/4\ 
NE\1/4\, E\1/2\ SE\1/4\; SW\1/4\ Section 28; SE\1/4\, S\1/2\ NE\1/
4\, NE\1/4\ NE\1/4\, E\1/2\ SW\1/4\ Section 29; NW\1/4\ NW\1/4\ 
Section 30; E\1/2\, E\1/2\ SW\1/4\ Section 31; W\1/2\ Section 32; 
W\1/2\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\, NW\1/4\ SE\1/4\ Section 33; 
NW\1/4\ NW\1/4\ Section 34.
    T.25S., R.08W. Willamette Meridian: Section 1; Sections 3-4; 
E\1/2\ E\1/2\ Section 5; Section 8 except W\1/2\; Section 9; N\1/2\ 
NE\1/4\, NE\1/4\ NW\1/4\, NW\1/4\ SW\1/4\ Section 10; Section 11; 
NE\1/4\ NE\1/4\ Section 12; Section 13; S\1/2\ SW\1/4\, NE\1/4\ 
NW\1/4\ Section 14; N\1/2\ N\1/2\, SW\1/4\, SW\1/4\ NW\1/4\, SE\1/4\ 
SE\1/4\ Section 15; Section 20; Section 23; Section 24 except SE\1/
4\, W\1/2\ NW\1/4\; Section 25; Section 30 except SW\1/4\, W\1/2\ 
NW\1/4\; Section 32 except SE\1/4\.
    T.26S., R.07W. Willamette Meridian: Section 5; Section 6 except 
NW\1/4\; Section 7 except NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\; N\1/2\ 
NE\1/4\, SE\1/4\ NE\1/4\, E\1/2\ SE\1/4\, N\1/2\ SW\1/4\, NW\1/4\ 
NW\1/4\ Section 8; Section 9 except N\1/2\ NW\1/4\.
    T.26S., R.08W. Willamette Meridian: W\1/2\, E\1/2\ SE\1/4\, 
SE\1/4\ NE\1/4\ Section 1; NW\1/4\ SE\1/4\, SE\1/4\ NW\1/4\ Section 
12.
[GRAPHIC] [TIFF OMITTED] TR24MY96.057

    Map and description of OR-04-f taken from United States Fish and 
Wildlife Service 1:100,000 map; Cottage Grove and Roseburg, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.22S., R.06W. Willamette Meridian: S\1/2\, S\1/2\ NE\1/4\ 
Section 17; Section 19; Section 21; Section 29; Section 30 except 
W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, NW\1/4\ SW\1/4\; Section 31; NW\1/
4\ NE\1/4\, NE\1/4\ NW\1/4\ Section 32.
    T.23S., R.06W. Willamette Meridian: W\1/2\ W\1/2\ Section 4; 
Section 5; N\1/2\ NE\1/4\, NE\1/4\ NW\1/4\ Section 8; NW\1/4\ NW\1/
4\ Section 9; Section 19; Section 31; W\1/2\ NW\1/4\, NW\1/4\ SW\1/
4\ Section 32.
    T.23S., R.07W. Willamette Meridian: N\1/2\ NW\1/4\, S\1/2\ NE\1/
4\, N\1/2\ SW\1/4\, NW\1/4\ SE\1/4\ Section 3; NE\1/4\ NE\1/4\ 
Section 4; SE\1/4\ SE\1/4\ Section 14; E\1/2\ NW\1/4\, S\1/2\ NE\1/
4\, NE\1/4\ SE\1/4\ Section 15; Section 23 except N\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, W\1/2\ NE\1/4\, SW\1/4\ SW\1/4\; Section 25; S\1/2\ 
S\1/2\ Section 27; S\1/2\ S\1/2\ Section 33.
    T.24S., R.07W. Willamette Meridian: N\1/2\ NW\1/4\ Section 2; 
S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ 
Section 3; Section 11 except NE\1/4\, NE\1/4\ NW\1/4\; N\1/2\ N\1/
2\, W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ Section 15; E\1/2\ SE\1/4\, 
SE\1/4\ NE\1/4\, SW\1/4\ SW\1/4\ Section 21; Section 23; Section 25; 
Section 27 except SW\1/4\, S\1/2\ NW\1/4\; SE\1/4\ SW\1/4\, NW\1/4\ 
SW\1/4\, SW\1/4\ NW\1/4\ Section 28; Section 35.
    T.25S., R.07W. Willamette Meridian: Section 1; NE\1/4\ Section 
2; Section 3; Section 11 except N\1/2\ NW\1/4\; NW\1/4\ SW\1/4\ 
Section 12.
[GRAPHIC] [TIFF OMITTED] TR24MY96.058

    Map and description of OR-04-g taken from United States Fish and 
Wildlife Service 1:100,000 map; Cottage Grove, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.21S., R.06W. Willamette Meridian: Section 31.
    T.21S., R.07W. Willamette Meridian: W\1/2\ Section 7; Section 16 
except NW\1/4\; Section 17; N\1/2\ Section 18; Section 19; NW\1/4\, 
N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, NE\1/4\ SW\1/4\, NW\1/4\ SE\1/4\ 
Section 20; Section 21; Section 25; NE\1/4\ Section 28; Section 29; 
N\1/2\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\, NE\1/4\ SE\1/4\ Section 30; 
Section 31; Section 33; Section 35.
    T.21S., R.08W. Willamette Meridian: Section 1; Section 2 except 
W\1/2\ SW\1/4\; Section 10 except N\1/2\ NE\1/4\; Section 11; 
Section 12 except S\1/2\ SW\1/4\, NE\1/4\ NE\1/4\; Section 13; 
Section 23; E\1/2\ Section 24; Section 25; N\1/2\ N\1/2\ Section 26; 
Section 35 except SW\1/4\ NW\1/4\, E\1/2\ NE\1/4\, SE\1/4\ SE\1/4\, 
NW\1/4\ SW\1/4\.
    T.22S., R.06W. Willamette Meridian: Section 5; NW\1/4\, N\1/2\ 
NE\1/4\, N\1/2\ SW\1/4\ Section 7.
    T.22S., R.07W. Willamette Meridian: Section 1; W\1/2\ Section 6; 
Section 7 except W\1/2\ NW\1/4\; Section 11 except NW\1/4\; NW\1/4\, 
N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, NE\1/4\ SW\1/4\ Section 15.

[[Page 26304]]

    T.22S., R.08W. Willamette Meridian: Section 1; NE\1/4\, S\1/2\ 
NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ Section 5; NE\1/4\ SE\1/4\ 
Section 12.
[GRAPHIC] [TIFF OMITTED] TR24MY96.059

    Map and description of OR-04-i taken from United States Fish and 
Wildlife Service 1:100,000 map; Eugene and Cottage Grove, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.17S., R.06W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 35; 
SW\1/4\ SW\1/4\ Section 36.
    T.17S., R.07W. Willamette Meridian: Section 11; S\1/2\, SW\1/4\ 
NW\1/4\ Section 13; Section 15; NW\1/4\, S\1/2\ S\1/2\, NW\1/4\ 
NE\1/4\ Section 19; SE\1/4\ Section 25; Section 29 except E\1/2\ 
W\1/2\, W\1/2\ NE\1/4\.
    T.17S., R.08W. Willamette Meridian: Section 13 except N\1/2\ 
NW\1/4\; Section 17 except SW\1/4\, NE1/ 4 NE\1/4\, NW\1/4\ NW\1/4\; 
Section 21; S\1/2\ SW\1/4\, NW\1/4\ NW\1/4\ Section 22; Section 23; 
Section 25; Section 27; NE\1/4\ SW\1/4\ Section 28; E\1/2\ E\1/2\ 
Section 33; Section 35.
    T.18S., R.06W. Willamette Meridian: Section 5 except SW\1/4\ 
SW\1/4\; SE\1/4\ Section 11; Section 19; Section 21 except E\1/2\ 
SE\1/4\, SE\1/4\ NE\1/4\; SW\1/4\ Section 23; Section 27 except S\1/
2\ NE\1/4\; Section 31; NE\1/4\, W\1/2\ SE\1/4\, E\1/2\ SW\1/4\ 
Section 35.
    T.18S., R.07W. Willamette Meridian: Section 1; N\1/2\ Section 7; 
Section 17 except SE\1/4\ SW\1/4\, NW\1/4\ SW\1/4\; Section 19; 
Section 21; Section 25; Section 27; Section 29; Section 31; Section 
33 except NE\1/4\ SW\1/4\, NW\1/4\ SE\1/4\; Section 35.
    T.18S., R.08W. Willamette Meridian: E\1/2\ NW\1/4\, NW\1/4\ 
NE\1/4\ Section 1; E\1/2\ NE\1/4\ Section 2; Section 3; Section 4 
except NE\1/4\, NW\1/4\ NW\1/4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\; 
Section 9; Section 11 except E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\, SE\1/
4\ SW\1/4\; Section 13 except N\1/2\ NE\1/4\, E\1/2\ NW\1/4\, W\1/2\ 
SW\1/4\; N\1/2\ N\1/2\, S\1/2\ SW\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ 
NE\1/4\, SW\1/4\ NW\1/4\ Section 15; Section 19; Section 21 except 
E\1/2\ NW\1/4\, NW\1/4\ SE\1/4\; S\1/2\, SE\1/4\ NE\1/4\, SW\1/4\ 
NW\1/4\ Section 23; Section 25; Section 27; SE\1/4\ Section 28; 
Section 29 except E\1/2\ NE\1/4\; Section 31; NW\1/4\ NE\1/4\ 
Section 32; Section 33 except NE\1/4\; Section 35 except S\1/2\ 
SW\1/4\, SW\1/4\ SE\1/4\.
    T.19S., R.06W. Willamette Meridian: Section 1 except N\1/2\ 
NW\1/4\, SW\1/4\ NW\1/4\; Section 3; Section 5; Section 7 except 
N\1/2\ NE\1/4\; NW\1/4\ SW\1/4\, W\1/2\ NW\1/4\ Section 8; E\1/2\, 
S\1/2\ SW\1/4\, SE\1/4\ NW\1/4\ Section 15; Section 17 except NE\1/
4\ NE\1/4\, SW\1/4\ NW\1/4\; Section 19 except SE\1/4\ SE\1/4\; E\1/
2\ NW\1/4\, SW\1/4\ NE\1/4\ Section 20; Section 21; Section 23; 
Section 25; Section 27; Section 29; Section 31; Section 33; SE\1/4\ 
NE\1/4\ Section 34; Section 35.
    T.19S., R.07W. Willamette Meridian: Section 1 except S\1/2\ 
SE\1/4\, SE\1/4\ SW\1/4\; Section 3 except SW\1/4\ SE\1/4\, SW\1/4\ 
SW\1/4\; S\1/2\, E\1/2\ NE\1/4\, NW\1/4\ NW\1/4\ Section 5; Section 
7; Section 9 except N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\; Section 11 
except N\1/2\ N\1/2\, SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\; Section 13; 
Section 15; Section 17; Section 19 except N\1/2\ SW\1/4\; Section 
21; Section 23; N\1/2\ NE\1/4\, S\1/2\ SE\1/4\ Section 25; Section 
27; Section 29; S\1/2\, W\1/2\ NW\1/4\ Section 30; Section 31; W\1/
2\ NW\1/4\ Section 32; Section 33; Section 35 except NW\1/4\ NE\1/
4\.
    T.19S., R.08W. Willamette Meridian: Section 1; Section 5; N\1/2\ 
NW\1/4\ Section 6; Section 7; SW\1/4\, W\1/2\ SE\1/4\ Section 8; 
W\1/2\ Section 9; NE\1/4\, E\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, NE\1/4\ 
SE\1/4\ Section 13; Section 17; N\1/2\ S\1/2\, SE\1/4\ NE\1/4\, 
NW\1/4\ NW\1/4\ Section 18; Section 19; Section 21; SE\1/4\ SE\1/4\ 
Section 22; Section 23; SE\1/4\ SE\1/4\ Section 24; Section 25; 
NW\1/4\ Section 26; Section 27; SE\1/4\ SE\1/4\ Section 28; Section 
29; SE\1/4\, SW\1/4\ SW\1/4\ Section 30; Section 31; W\1/2\ W\1/2\ 
Section 32; Section 33; Section 35.
    T.20S., R.06W. Willamette Meridian: Section 1 except S\1/2\ 
SW\1/4\; Section 3 except E\1/2\ SW\1/4\, SW\1/4\ SW\1/4\; SE\1/4\ 
NE\1/4\ Section 4; Section 5; S\1/2\ S\1/2\ Section 6; Section 7; 
Section 9; Section 11 except W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\, SE\1/
4\ NE\1/4\; Section 13; Section 15; Section 17; W\1/2\ W\1/2\, E\1/
2\ SE\1/4\ Section 18; Section 19; Section 21; Section 23; N\1/2\ 
SE\1/4\, SW\1/4\ SE\1/4\ Section 26; Section 27; Section 29; Section 
31; E\1/2\ NE\1/4\ Section 32; SE\1/4\, NW\1/4\, NW\1/4\ NE\1/4\, 
S\1/2\ NE\1/4\, SE\1/4\ SW\1/4\ Section 33; Section 35 except S\1/2\ 
SW\1/4\.
    T.20S., R.07W. Willamette Meridian: Section 1; E\1/2\ E\1/2\ 
Section 2; Section 3 except NE\1/4\ NW\1/4\; Section 5; Section 6 
except N\1/2\ N\1/2\; N\1/2\ N\1/2\ Section 7; Section 11; Section 
12 except E\1/2\ E\1/2\, NW\1/4\ SE\1/4\, SW\1/4\ NE\1/4\; Section 
13-15; Section 21; Section 22 except SE\1/4\, SE\1/4\ NE\1/4\; 
Section 23 except W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\; Section 33 except 
E\1/2\ NE\1/4\; SW\1/4\ Section 34.
    T.20S. R.08W. Willamette Meridian: Section 1; SW\1/4\ Section 2; 
Section 3; SE\1/4\ SE\1/4\ Section 4; N\1/2\ NE\1/4\ Section 6; E\1/
2\ E\1/2\ Section 8; Section 9; Section 11; W\1/2\ W\1/2\ Section 
12.
    T.21S., R.06W. Willamette Meridian: Section 3; Section 5; W\1/2\ 
SW\1/4\, SW\1/4\ NW\1/4\, SE\1/4\ SW\1/4\ Section 6; Section 7; 
Section 8 except SE\1/4\; Section 9; Section 11; Section 14 except 
NE\1/4\; Sections 15-17; Section 18 except NW\1/4\ NW\1/4\, S\1/2\ 
NW\1/4\, NE\1/4\, NW\1/4\ SE\1/4\, E\1/2\ SW\1/4\, SW\1/4\ SW\1/4\; 
Section 19; NW\1/4\ NE\1/4\ Section 20; Section 21; S\1/2\ NE\1/4\, 
N\1/2\ SE\1/4\ Section 22; Section 23; Section 27.

    Critical Habitat includes only State lands described within the 
following areas:

    T.17S., R.08W. Willamette Meridian: SE\1/4\ NW\1/4\ Section 28.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.060
    
    Map and description of OR-04-j objective taken from United States 
Fish and Wildlife Service 1:100,000 map; Eugene, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.13S., R.06W. Willamette Meridian: S\1/2\ Section 31.
    T.14S., R.06W. Willamette Meridian: NW\1/4\, W\1/2\ SW\1/4\ 
Section 6; Section 7; W\1/2\ W\1/2\ Section 18; W\1/2\ W\1/2\ 
Section 19; W\1/2\ W\1/2\ Section 30; Section 31.
    T.14S., R.07W. Willamette Meridian: Section 1; Section 9; 
Section 11 except E\1/2\ SE\1/4\; Section 12 except S\1/2\ SW\1/4\; 
Section 13 except SW\1/4\, SW\1/4\ SE\1/4\; SE\1/4\ SW\1/4\ Section 
14; Section 17; Section 19; Section 20 except NW\1/4\ NW\1/4\, E\1/
2\ NW\1/4\, NE\1/4\, E\1/2\ SE\1/4\; Section 21 except W\1/2\ NW\1/
4\, NE\1/4\ NW\1/4\; Section 23 except SW\1/4\ SE\1/4\; S\1/2\ SE\1/
4\, NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ Section 24; Section 25; Section 
26 except N\1/2\ N\1/2\, SE\1/4\ SW\1/4\; Section 27; S\1/2\ Section 
28; Sections 29-34.
    T.14S., R.08W. Willamette Meridian: Section 19 except N\1/2\ 
N\1/2\, SW\1/4\ NE\1/4\, NW\1/4\ SE\1/4\; E\1/2\ SE\1/4\ Section 20; 
S\1/2\ SE\1/4\, SW\1/4\ Section 21; S\1/2\ SW\1/4\, W\1/2\ SE\1/4\ 
Section 22; S\1/2\ SW\1/4\ Section 23; E\1/2\ SE\1/4\, NE\1/4\ 
Section 25; NW\1/4\ Section 26; Section 27; E\1/2\ SW\1/4\ Section 
28; Section 29 except N\1/2\ N\1/2\; Section 30 except N\1/2\ NE\1/
4\, SE\1/4\ NE\1/4\, SE\1/4\, NE\1/4\ NW\1/4\; Section 31 except 
N\1/2\ S\1/2\; Section 32; Section 33 except S\1/2\ S\1/2\; NW\1/4\, 
N\1/2\ NE\1/4\, NW\1/4\ SW\1/4\ Section 34.
    T.15S., R.06W. Willamette Meridian: Section 29; Section 31; 
Section 33 except NE\1/4\, E\1/2\ SE\1/4\, SW\1/4\ NW\1/4\; SE\1/4\ 
SE\1/4\ Section 34; SW\1/4\ SW\1/4\ Section 35.
    T.15S., R.07W. Willamette Meridian: Section 3 except SW\1/4\ 
SW\1/4\; Section 4 except E\1/2\ NE\1/4\, N\1/2\ SE\1/4\; Sections 
5-6; Section 7 except S\1/2\ SW\1/4\, N\1/2\ SE\1/4\; NW\1/4\ NE\1/
4\ Section 8; Sections 18-21; Section 25 except SE\1/4\ NE\1/4\; 
Section 27; Section 29; Section 31; Section 33 except NE\1/4\; SE\1/
4\ NW\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\, SW\1/4\ SE\1/4\ 
Section 35.
    T.15S., R.08W. Willamette Meridian: Section 1; S\1/2\, NE\1/4\ 
NE\1/4\ Section 2; S\1/2\ SE\1/4\ Section 3; SW\1/4\ SW\1/4\ Section 
4; Section 5 except S\1/2\ NE\1/4\, SE\1/4\ NW\1/4\, SW\1/4\, N\1/2\ 
SE\1/4\; Section 6 except SE\1/4\

[[Page 26305]]

NW\1/4\, S\1/2\ SW\1/4\, SW\1/4\ NE\1/4\, SE\1/4\; Section 7 except 
N\1/2\ N\1/2\, SE\1/4\ NE\1/4\; Section 9 except E\1/2\ E\1/2\, 
SW\1/4\ SE\1/4\; Section 11; Sections 13-14; Section 15 except NW\1/
4\ NW\1/4\; Sections 16-20; Section 21 except SW\1/4\ NW\1/4\; 
Sections 22-27; N\1/2\ Section 28; Sections 29-31; N\1/2\, W\1/2\ 
SW\1/4\ Section 32; Section 33; Section 35; W\1/2\ Section 36.
    T.16S., R.06W. Willamette Meridian: SE\1/4\, E\1/2\ SW\1/4\, 
NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\ Section 3; Section 5 except S\1/2\ 
SW\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ NW\1/4\; Section 7 except S\1/2\ 
SE\1/4\, NE\1/4\ SE\1/4\; Section 9; SW\1/4\ NE\1/4\, NE\1/4\ NW\1/
4\ Section 12; NW\1/4\, N\1/2\ NE\1/4\, W\1/2\ SE\1/4\, SW\1/4\ 
SW\1/4\ Section 17; S\1/2\ S\1/2\ Section 33.
    T.16S., R.07W. Willamette Meridian: Section 1; Section 3 except 
S\1/2\ SW\1/4\; Section 5 except W\1/2\ SW\1/4\; S\1/2\ SW\1/4\ 
Section 6; Section 7 except NE\1/4\, S\1/2\ NW\1/4\, NE\1/4\ SE\1/
4\; NE\1/4\, N\1/2\ SE\1/4\, SE\1/4\ NW\1/4\ Section 11; Section 13; 
E\1/2\, SW\1/4\ Section 15; W\1/2\ NW\1/4\ Section 18; S\1/2\ 
Section 19; Section 21.
    T.16S., R.08W. Willamette Meridian: Section 1; Sections 3-4; 
Section 5 except S\1/2\ NW\1/4\, SW\1/4\ NE\1/4\, NW\1/4\ SW\1/4\; 
NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\, NW\1/4\ NE\1/4\ Section 6; 
Section 7 except W\1/2\, S\1/2\ NE\1/4\, N\1/2\ SE\1/4\; Sections 8-
9; W\1/2\ W\1/2\ Section 10; Section 11; Section 13 except S\1/2\ 
SE\1/4\; Section 15; Section 17 except SW\1/4\ NW\1/4\; Section 18 
except NW\1/4\, W\1/2\ E\1/2\, NE\1/4\ NE\1/4\, SE\1/4\ SW\1/4\; 
Section 19 except E\1/2\ SW\1/4\, S\1/2\ NE\1/4\, NW\1/4\ NE\1/4\, 
SE\1/4\ NW\1/4\; Section 20 except W\1/2\ SE\1/4\, S\1/2\ SW\1/4\; 
Sections 21-23; SW\1/4\ SW\1/4\, SW\1/4\ SE\1/4\ Section 24; Section 
25; N\1/2\ Section 26; Section 27; Section 28 except S\1/2\ SE\1/4\; 
Section 29 except NW\1/4\ NW\1/4\; S\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ 
Section 30; Section 31 except N\1/2\ NW\1/4\; Section 32 except 
SE\1/4\, Section 33; S\1/2\ Section 34; N\1/2\, NW\1/4\ SE\1/4\ 
Section 35.
    T.17S., R.08W. Willamette Meridian: Section 5; N\1/2\ NE\1/4\ 
Section 6.
[GRAPHIC] [TIFF OMITTED] TR24MY96.061

    Map and description of OR-04-k taken from United States Fish and 
Wildlife Service 1:100,000 map; Corvallis, Eugene, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.12S., R.07W. Willamette Meridian: SE\1/4\, S\1/2\ SW\1/4\, 
S\1/2\ NE\1/4\ Section 10; Section 11 except N\1/2\ N\1/2\; W\1/2\ 
W\1/2\ Section 13; Sections 14-15; Section 16 except NW\1/4\ NW\1/
4\; Section 19 except N\1/2\ N\1/2\; Section 20 except SW\1/4\ SW\1/
4\; Sections 21-23; W\1/2\, S\1/2\ SE\1/4\ Section 24; Section 25; 
Section 26 except SW\1/4\; Section 27; Section 28 except NE\1/4\ 
NW\1/4\; Sections 29-31; Section 32 except NW\1/4\, NW\1/4\ NE\1/4\; 
Sections 33-35; W\1/2\ W\1/2\, NE\1/4\ NW\1/4\ Section 36.
    T.12S., R.08W. Willamette Meridian: SW\1/4\, SW\1/4\ NW\1/4\, 
S\1/2\ SE\1/4\ Section 3; NE\1/4\, N\1/2\ SW\1/4\, S\1/2\ SE\1/4\ 
Section 5; N\1/2\ SE\1/4\ Section 8; Section 9 except NE\1/4\ NE\1/
4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, W\1/2\ SE\1/4\; SE\1/4\, NE\1/
4\ NE\1/4\ Section 10; Section 11 except N\1/2\ NE\1/4\, SE\1/4\ 
SE\1/4\; S\1/2\ Section 12; E\1/2\, E\1/2\ SW\1/4\ Section 13; N\1/
2\ NW\1/4\, NE\1/4\, SE\1/4\ SW\1/4\ Section 15; N\1/2\ NE\1/4\ 
Section 16; Section 17 except NW\1/4\, NW\1/4\ NE\1/4\; SW\1/4\, 
W\1/2\ SE\1/4\, SW\1/4\ NW\1/4\ Section 18; W\1/2\, SW\1/4\ SE\1/4\ 
Section 19; S\1/2\ NE\1/4\ Section 20; Section 21; Section 22 except 
NW\1/4\ NW\1/4\; SE\1/4\, S\1/2\ SW\1/4\ Section 23; W\1/2\ W\1/2\ 
Section 24; Section 25; N\1/2\ Section 26; Section 27; Section 29 
except NE\1/4\; W\1/2\ SW\1/4\, N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\, 
NE\1/4\ SE\1/4\ Section 30; Section 31; Section 33 except SE\1/4\, 
W\1/2\ NE\1/4\; Section 35 except SW\1/4\ NW\1/4\, NW\1/4\ SW\1/4\.
    T.12S., R.09W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 13; 
E\1/2\ E\1/2\ Section 24.
    T.13S., R.07W. Willamette Meridian: Section 2 except N\1/2\ 
NE\1/4\, NE\1/4\ NW\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\; Section 
3; Section 5; W\1/2\ Section 6; Section 7; Section 9; N\1/2\ NW\1/
4\, SW\1/4\ NW\1/4\ Section 15; Section 17; SW\1/4\ SW\1/4\ Section 
18; Section 19 except NE\1/4\ SE\1/4\; E\1/2\ NW\1/4\, NE\1/4\ SW\1/
4\, W\1/2\ NE\1/4\ Section 21; S\1/2\ SE\1/4\ Section 23; SW\1/4\, 
W\1/2\ SE\1/4\, SW\1/4\ NW\1/4\ Section 27; N\1/2\ SE\1/4\, SE\1/4\ 
NE\1/4\, NW\1/4\ NE\1/4\, E\1/2\ NW\1/4\ Section 35.
    T.13S., R.08W. Willamette Meridian: Section 1; NE\1/4\ Section 
2; Section 3 except N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\; Section 5; S\1/
2\ Section 6; Section 7; E\1/2\ SE\1/4\ Section 8; Section 9 except 
NW\1/4\ NE\1/4\; Section 11; W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, E\1/2\ 
SE\1/4\, NW\1/4\ SE\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ SW\1/4\ Section 
12; Section 13; E\1/2\, NE\1/4\ SW\1/4\ Section 14; Section 15; 
Section 17; Sections 19-21; Section 23; W\1/2\ W\1/2\, SE\1/4\ NW\1/
4\, SE\1/4\ NE\1/4\ Section 24; Section 25; W\1/2\ SE\1/4\, E\1/2\ 
SW\1/4\, SW\1/4\ SW\1/4\ Section 26; Section 27; Section 29; NW\1/
4\, SW\1/4\ SE\1/4\ Section 30; Section 31; SE\1/4\ SE\1/4\, SW\1/4\ 
NW\1/4\ Section 32; Section 33; SW\1/4\ NW\1/4\ Section 34; Section 
35 except E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\.
    T.13S., R.09W. Willamette Meridian: E\1/2\ E\1/2\ Section 25.
    T.14S., R.07W. Willamette Meridian: SW\1/4\ SW\1/4\ Section 5; 
NE\1/4\ NE\1/4\ Section 7.
    T.14S., R.08W. Willamette Meridian: N\1/2\ NE\1/4\, NE\1/4\ 
NW\1/4\ Section 3; Section 5 except S\1/2\ SE\1/4\; Section 7 except 
W\1/2\ W\1/2\, NE\1/4\ NW\1/4\, NE\1/4\ NE\1/4\; Section 11 except 
NW\1/4\, NW\1/4\ NE\1/4\, N\1/2\ SW\1/4\; N\1/2\ SW\1/4\, W\1/2\ 
NW\1/4\ Section 15.
[GRAPHIC] [TIFF OMITTED] TR24MY96.062

    Map and description of OR-06-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Coos Bay, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.25S., R.12W. Willamette Meridian: SE\1/4\ SE\1/4\ Section 35.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.063
    
    Map and description of OR-06-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Roseburg, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.25S., R.10W. Willamette Meridian: Section 31; Section 33.
    T.26S., R.09W. Willamette Meridian: SE\1/4\, E\1/2\ SW\1/4\ 
Section 9; Section 10 except NE\1/4\; Section 17; S\1/2\ S\1/2\ 
Section 18; Section 19; SW\1/4\ Section 20; Section 21; N\1/2\ N\1/
2\, S\1/2\ S\1/2\ Section 28; Section 29; Section 31 except N\1/2\ 
SW\1/4\, SW\1/4\ SW\1/4\; SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ NW\1/4\ 
Section 32; Section 33.
    T.26S., R.10W. Willamette Meridian: Sections 3-5; E\1/2\, SE\1/
4\ NW\1/4\ Section 6; Section 7; SW\1/4\, S\1/2\ NE\1/4\ Section 8; 
Section 9; Section 11; Section 13; N\1/2\ Section 14; Sections 15-
17; Section 19; SE\1/4\ Section 20; N\1/2\ Section 21; W\1/2\ 
Section 22; Section 23; N\1/2\ N\1/2\, N\1/2\ S\1/2\ Section 24; 
Section 25; Section 27; NE\1/4\ Section 28; Sections 29-31;

[[Page 26306]]

E\1/2\ Section 32; Section 33; Section 35 except SE\1/4\.
    T.27S., R.09W. Willamette Meridian: Sections 4-5; SE\1/4\, NE\1/
4\ NE\1/4\, SE\1/4\ SW\1/4\ Section 6; Section 7 except NW\1/4\ 
SW\1/4\; N\1/2\ NW\1/4\, W\1/2\ SW\1/4\ Section 8; Section 9; 
Section 17; Section 18 except SW\1/4\, SE\1/4\ SE\1/4\; Sections 19-
21; Sections 29-31; E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\ Section 33.
    T.27S., R.10W. Willamette Meridian: E\1/2\ E\1/2\, W\1/2\ SE\1/
4\ Section 1; Section 3; W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ Section 4; 
Section 5; S\1/2\ SE\1/4\ Section 6; Sections 7-9; NE\1/4\, SE\1/4\ 
SE\1/4\ Section 10; Section 11; S\1/2\ NW\1/4\, W\1/2\ SW\1/4\, 
SE\1/4\ SE\1/4\ Section 12; Sections 13-15; N\1/2\ Section 16; 
Sections 17-20; Sections 21-23; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ 
Section 24; Sections 25-29; NE\1/4\, SW\1/4\ SW\1/4\ Section 30; 
Section 31; W\1/2\ W\1/2\, SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\ Section 
32; Section 33; SW\1/4\ NW\1/4\ Section 34; Section 35.
    T.28S., R.09W. Willamette Meridian: SE\1/4\ SW\1/4\ Section 4; 
Section 5; Section 7; Section 9.
    T.28S., R.10W. Willamette Meridian: Section 1; Section 3 except 
E\1/2\ SE\1/4\; N\1/2\ SE\1/4\ Section 4; Section 5; N\1/2\ NE\1/4\, 
NE\1/4\ NW\1/4\, SE\1/4\ SE\1/4\ Section 6; Section 7 except W\1/2\ 
NW\1/4\, NW\1/4\ SW\1/4\; S\1/2\ N\1/2\, NE\1/4\ NW\1/4\ Section 8; 
Section 9 except NE\1/4\; N\1/2\ NE\1/4\, E\1/2\ NW\1/4\, E\1/2\ 
SE\1/4\ Section 11; NW\1/4\ NW\1/4\ Section 12.
[GRAPHIC] [TIFF OMITTED] TR24MY96.064

    Map and description of OR-06-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Roseburg and Canyonville, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:
    T.29S., R.10W. Willamette Meridian: S\1/2\ SE\1/4\, W\1/2\ SW\1/
4\ Section 11; SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ 
Section 12; Section 13; E\1/2\ W\1/2\, E\1/2\ Section 14; NE\1/4\ 
NE\1/4\ Section 20; Section 21; E\1/2\, W\1/2\ SW\1/4\ Section 23; 
Section 31.
    T.30S., R.11W. Willamette Meridian: E\1/2\, SE\1/4\ SW\1/4\ 
Section 1; E\1/2\ Section 12; E\1/2\, NW\1/4\ Section 13; N\1/2\ 
SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\, NE\1/4\ SW\1/4\, SE\1/4\ 
NW\1/4\ Section 35.
    T.31S., R.11W. Willamette Meridian: SW\1/4\ Section 2.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.065
    
    Map and description of OR-06-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Roseburg, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.28S., R.08W. Willamette Meridian: Section 3; Section 5; NE\1/
4\ Section 8; Section 9; N\1/2\ NW\1/4\ Section 10; NW\1/4\ NW\1/4\ 
Section 11; N\1/2\ NW\1/4\, W\1/2\ NE\1/4\, W\1/2\ SW\1/4\ Section 
15; Section 17; Section 27; Section 33.
    T.28S., R.09W. Willamette Meridian: Section 19; Section 21; 
SW\1/4\ Section 22; Section 23; Section 25; Section 27; Section 29; 
Section 31; Section 33; Section 35.
    T.28S., R.10W. Willamette Meridian: NE\1/4\ Section 24.
    T.29S., R.08W. Willamette Meridian: Section 5.
    T.29S., R.09W. Willamette Meridian: Section 1 except SE\1/4\; 
Section 3; Section 5; Section 11 except N\1/2\ NE\1/4\; Section 15; 
Section 23 except S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; 
Section 27 except S\1/2\ SE\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.066

    Map and description of OR-07-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Port Orford, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.31S., R.12W. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\ Section 5; SE\1/4\, E\1/2\ SW\1/4\, SW\1/4\ SW\1/4\, NE\1/4\ 
NW\1/4\ Section 15; Section 21; Section 22 except SE\1/4\; Section 
23 except E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\; W\1/2\ NW\1/4\ Section 
25; Section 27.
    T.32S., R.10W. Willamette Meridian: Section 2 except E\1/2\ E\1/
2\; Section 3 except E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, SW\1/4\ SW\1/
4\; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 4; S\1/2\ Section 7; 
SW\1/4\ SW\1/4\, E\1/2\ SE\1/4\, NE\1/4\ NE\1/4\, S\1/2\ NE\1/4\ 
Section 8; Section 9 except SE\1/4\, S\1/2\ NE\1/4\; Section 10; 
Section 11 except E\1/2\ E\1/2\, W\1/2\ SE\1/4\, E\1/2\ SW\1/4\; 
N\1/2\ NW\1/4\, W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ Section 15; Sections 
16-17; Section 18 except E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; Section 19 
except S\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\, E\1/2\ 
SE\1/4\, SW\1/4\ SE\1/4\; Section 20-21; W\1/2\ NW\1/4\ Section 22.
    T.32S., R.11W. Willamette Meridian: SE\1/4\ Section 1; N\1/2\ 
N\1/2\, SW\1/4\ NW\1/4\ Section 4; Section 5; N\1/2\, NE\1/4\ SE\1/
4\ Section 6; NE\1/4\ SE\1/4\ Section 7; Section 8 except SW\1/4\ 
NW\1/4\; W\1/2\ Section 9; Section 12 except SW\1/4\ SW\1/4\; 
Section 13; SE\1/4\, E\1/2\ SW\1/4\ Section 14; W\1/2\ Section 16; 
Section 17; Section 18 except N\1/2\ NW\1/4\, E\1/2\ SW\1/4\, NW\1/
4\ SE\1/4\; Section 19; Section 20 except S\1/2\ SE\1/4\; SE\1/4\ 
Section 22; Section 23 except SE\1/4\ NE\1/4\, NW\1/4\ NW\1/4\; 
Section 24 except S\1/2\ NW\1/4\, N\1/2\ SW\1/4\; Section 25 except 
E\1/2\ E\1/2\; Section 26; NE\1/4\ Section 27; E\1/2\, NE\1/4\ SW\1/
4\, S\1/2\ SW\1/4\ Section 28; S\1/2\ S\1/2\, NW\1/4\ NW\1/4\, NW\1/
4\ SW\1/4\ Section 29; Sections 30-34; Section 35 except NE\1/4\ 
NE\1/4\; W\1/2\ W\1/2\ Section 36.
    T.32S., R.12W. Willamette Meridian: E\1/2\ NE\1/4\, N\1/2\ SE\1/
4\, SW\1/4\ SE\1/4\ Section 1; W\1/2\ NW\1/4\ Section 2; Section 3; 
Section 10; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 13; W\1/2\, 
NW\1/4\ NE\1/4\ Section 15; Sections 19-20; W\1/2\, W\1/2\ NE\1/4\ 
Section 21; SE\1/4\ SE\1/4\ Section 23; E\1/2\ E\1/2\, S\1/2\ SW\1/
4\ Section 24; Section 25; Section 26 except N\1/2\ NW\1/4\; S\1/2\ 
S\1/2\, NE\1/4\ SW\1/4\ Section 27; SE\1/4\ SE\1/4\ Section 28; N\1/
2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 29; Section 30 except SE\1/4\ 
SE\1/4\; W\1/2\, W\1/2\ E\1/2\, S\1/2\ SE\1/4\ Section 31; E\1/2\, 
E\1/2\ SW\1/4\ Section 33; Sections 34-36.
    T.32S., R.13W. Willamette Meridian: Section 4 except N\1/2\ N\1/
2\; S\1/2\ Section 5; S\1/2\, SE\1/4\ NE\1/4\ Section 6; N\1/2\ N\1/
2\, SE\1/4\ NE\1/4\, S\1/2\ S\1/2\, NE\1/4\ SE\1/4\ Section 7; 
Section 8; Sections 22-23; S\1/2\, S\1/2\ N\1/2\ Section 24; 
Sections 25-27; E\1/2\ NE\1/4\, NE\1/4\ SE\1/4\ Section 31; Sections 
32-36.
    T.32S., R.14W. Willamette Meridian: N\1/2\ Section 17; W\1/2\ 
SW\1/4\, SE\1/4\ SW\1/4\ Section 19; NE\1/4\, N\1/2\ SE\1/4\ Section 
22; Section 23 except S\1/2\ S\1/2\, NE\1/4\ SE\1/4\; Section 24 
except W\1/2\ SW\1/4\, NW\1/4\ NE\1/4\, NE\1/4\ NW\1/4\; E\1/2\ 
NE\1/4\, NW\1/4\ NE\1/4\, NE\1/4\ SE\1/4\ Section 25; S\1/2\ Section 
29; SE\1/4\, SE\1/4\ SW\1/4\, SE\1/4\ NE\1/4\, NW\1/4\ NW\1/4\ 
Section 30; Section 31 except W\1/2\ W\1/2\, NE\1/4\ SW\1/4\, E\1/2\ 
NW\1/4\; Section 32 except SE\1/4\ SE\1/4\.
    T.33S., R.11W. Willamette Meridian: Sections 7-8; Section 9 
except E\1/2\ NW\1/4\, W\1/2\ NE\1/4\; Sections 10-11; W\1/2\ 
Section 12; N\1/2\ NE\1/4\ Section 13; Section 14 except SE\1/4\, 
SE\1/4\ SW\1/4\; Sections 15-20; Section 21 except SE\1/4\; Section 
22 except SE\1/4\ SE\1/4\; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 
23; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 27; S\1/2\ NE\1/4\, N\1/
2\ SE\1/4\, SE\1/4\ SW\1/4\ Section 28; W\1/2\, N\1/2\ NE\1/4\ 
Section 29; Sections 30-31; Section 32 except N\1/2\ NE\1/4\; NW\1/
4\ NW\1/4\ Section 33.

[[Page 26307]]

    T.33S., R.12W. Willamette Meridian: Section 7 except W\1/2\ 
SW\1/4\; Section 8; W\1/2\ SW\1/4\, SE\1/4\, W\1/2\ NW\1/4\ Section 
9; Section 10 except N\1/2\ NW\1/4\; Sections 11-32; Section 33 
except E\1/2\ SE\1/4\; Section 34 except N\1/2\ SW\1/4\; Sections 
35-36.
    T.33S., R.13W. Willamette Meridian: E\1/2\ Section 8; Sections 
9-11; Section 12 except SE\1/4\ SE\1/4\; Section 13 except N\1/2\ 
NE\1/4\, NE\1/4\ NW\1/4\, SW\1/4\ NW\1/4\, NW\1/4\ SW\1/4\; Section 
14 except S\1/2\ S\1/2\, NE\1/4\ SW\1/4\; SW\1/4\, E\1/2\ NE\1/4\, 
NW\1/4\ NW\1/4\ Section 15; S\1/2\, S\1/2\ NW\1/4\ Section 16; SE\1/
4\, SE\1/4\ NE\1/4\ Section 17; Sections 19-20; Section 21 except 
SE\1/4\; E\1/2\ NE\1/4\ Section 22; Section 23 except SW\1/4\ SW\1/
4\, N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\; Sections 24-25; S\1/2\ SE\1/4\, 
SE\1/4\ SW\1/4\ Section 26; NW\1/4\ Section 28; Section 29 except 
S\1/2\ SW\1/4\, SE\1/4\; Section 30 except S\1/2\ SE\1/4\; NW\1/4\, 
N\1/2\ SW\1/4\ Section 31; E\1/2\ NE\1/4\, SE\1/4\ Section 34; 
Sections 35-36.
    T.33S., R.14W. Willamette Meridian: Section 7 except N\1/2\ N\1/
2\, S\1/2\ NE\1/4\, E\1/2\ SE\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ NW\1/
4\; S\1/2\ SE\1/4\ Section 13; SW\1/4\ SW\1/4\ Section 15; S\1/2\ 
SE\1/4\, NW\1/4\, NW\1/4\ SW\1/4\, NW\1/4\ SE\1/4\ Section 17; SE\1/
4\ Section 18; NW\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 20; 
Section 21 except NW\1/4\ NW\1/4\, SW\1/4\; Section 22 except SW\1/
4\, E\1/2\ NE\1/4\; Section 23 except N\1/2\ N\1/2\, SW\1/2\ NE\1/
4\; Sections 24-28; Section 29 except NW\1/4\; Sections 32-35; 
Section 36 except NW\1/4\, E\1/2\ SE\1/4\.
    T.34S., R.11W. Willamette Meridian: NW\1/4\, NW\1/4\ NE\1/4\ 
Section 4; Sections 5-6; Section 7 except NE\1/4\ SE\1/4\; NW\1/4\ 
NW\1/4\, E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 8; W\1/2\ NW\1/4\ 
Section 9; NE\1/4\ Section 18; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\, 
NW\1/4\ SW\1/4\, SE\1/4\ Section 19; NE\1/4\, E\1/2\ NW\1/4\ Section 
30; W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ Section 31.
    T.34S., R.12W. Willamette Meridian: Sections 1-3; Section 4 
except W\1/2\ SW\1/4\; Section 5 except S\1/2\ S\1/2\; Section 6 
except N\1/2\ NE\1/4\; Section 7 except E\1/2\ NE\1/4\, SE\1/4\; 
SE\1/4\ Section 8; Sections 9-36.
    T.34S., R.13W. Willamette Meridian: Sections 1-2; NE\1/4\, N\1/
2\ SE\1/4\, E\1/2\ NW\1/4\ Section 3; Sections 11-14; E\1/2\ Section 
15; SW\1/4\, W\1/2\ SE\1/4\ Section 17; Section 20 except NW\1/4\ 
SW\1/4\, S\1/2\ SW\1/4\; Section 21 except NW\1/4\ NW\1/4\; Section 
22 except NW\1/4\ NE\1/4\; Section 23 except NW\1/4\ NW\1/4\; 
Sections 24-26; N\1/2\, NE\1/4\ SE\1/4\ Section 27.
    T.35S., R.11W. Willamette Meridian: SW\1/4\, W\1/2\ NW\1/4\ 
Section 6; NW\1/4\ Section 7; S\1/2\ SW\1/4\ Section 18; N\1/2\ 
NW\1/4\, NE\1/4\ SW\1/4\ Section 19; Section 31; W\1/2\ Section 32.
    T.35S., R.12W. Willamette Meridian: Sections 1-4; Section 5 
except SW\1/4\ SW\1/4\, NE\1/4\ SW\1/4\; Section 6 except SE\1/4\ 
SE\1/4\, SW\1/4\ SW\1/4\; SE\1/4\ SW\1/4\, E\1/2\ Section 7; 
Sections 8-9; N\1/2\, NW\1/4\ SW\1/4\ Section 10; N\1/2\ N\1/2\, 
SW\1/4\ NW\1/4\, SW\1/4\ SE\1/4\ Section 11; NE\1/4\ NE\1/4\ Section 
12; Section 13 except SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\, N\1/2\ N\1/
2\; Section 14; Section 15 except NW\1/4\; SE\1/4\ SE\1/4\, W\1/2\ 
NE\1/4\, NW\1/4\, N\1/2\ SW\1/4\ Section 16; Sections 17-19; Section 
20 except E\1/2\ NE\1/4\, N\1/2\ SE\1/4\; Section 21 except NW\1/4\, 
NW\1/4\ NE\1/4\, NW\1/4\ SW\1/4\; Sections 22-28; Section 29 except 
N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\, W\1/2\ NE\1/4\; Section 30 except 
SE\1/4\ NE\1/4\, SE\1/4\, SE\1/4\ SW\1/4\; Section 32 except SW\1/4\ 
SW\1/4\; Sections 33-36.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.32S., R.13W. Willamette Meridian: Sections 18-21; Sections 28-
29; N\1/2\, NW\1/4\ SW\1/4\ Section 30.
[GRAPHIC] [TIFF OMITTED] TR24MY96.067

[[Page 26308]]

    Map and description of OR-07-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Port Orford and Gold Beach, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.35S., R.12W. Willamette Meridian: Section 31 except E\1/2\ 
E\1/2\, N\1/2\ N\1/2\, SW\1/4\ NW\1/4\.
    T.35S., R.13W. Willamette Meridian: NW\1/4\, N\1/2\ NE\1/4\, 
S\1/2\ SE\1/4\, S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\ Section 31; N\1/2\ 
N\1/2\ Section 32; N\1/2\ Section 33; N\1/2\, NE\1/4\ SE\1/4\ 
Section 34; Section 35; W\1/2\, NW\1/4\ NE\1/4\ Section 36.
    T.36S., R.12W. Willamette Meridian: Sections 1-4; NE\1/4\, E\1/
2\ SE\1/4\, SE\1/4\ NW\1/4\, N\1/2\ NW\1/4\, NW\1/4\ SE\1/4\ Section 
5; E\1/2\ E\1/2\, W\1/2\ SE\1/4\, SW\1/4\ NE\1/4\ Section 8; 
Sections 9-17; S\1/2\ SE\1/4\ Section 18; NE\1/4\, E\1/2\ SE\1/4\ 
Section 19; Sections 20-23; Section 24 except SE\1/4\ SE\1/4\; N\1/
2\ NW\1/4\ Section 25; Section 26 except N1/2 SE1/4; Sections 27-29; 
NE\1/4\, E\1/2\ SE\1/4\, NW\1/4\ SE\1/4\, E\1/2\ NW\1/4\ Section 30; 
SE\1/4\, E\1/2\ SW\1/4\, E\1/2\ NE\1/4\, SW\1/4\ SW\1/4\ Section 31; 
Sections 32-35; SW\1/4\, W\1/2\ NW\1/4\ Section 36.
    T.36S., R.13W. Willamette Meridian: S\1/2\ S\1/2\, E\1/2\ NE\1/
4\, NE\1/4\ SE\1/4\, N\1/2\ NW\1/4\ Section 1; SW\1/4\, S\1/2\ SE\1/
4\, NE\1/4\ NE\1/4\ Section 2; Section 3; NE\1/4\, N\1/2\ SE\1/4\, 
N\1/2\ NW\1/4\ Section 4; Section 5; NW\1/4\, SE\1/4\, NE\1/4\ SW\1/
4\, E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 6; N\1/2\, SW\1/4\ SE\1/
4\, NW\1/4\ SW\1/4\ Section 7; Section 8 except SE\1/4\ NE\1/4\, 
NE\1/4\ SE\1/4\; Section 9 except NW\1/4\ NE\1/4\, NE\1/4\ NW\1/4\, 
SW\1/4\ NW\1/4\, NW\1/4\ SW\1/4\; Sections 10-11; Section 12 except 
E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; Section 13 except SE\1/4\, E\1/2\ 
SW\1/4\; Section 14 except SW\1/4\; Section 15 except W\1/2\ NW\1/
4\, NW\1/4\ SW\1/4\; N\1/2\ NE\1/4\, SW\1/4\, S\1/2\ SE\1/4\ Section 
17; E\1/2\, E\1/2\ SW\1/4\ Section 18; E\1/2\ SE\1/4\, NE\1/4\, S\1/
2\ SW\1/4\, NE\1/4\ NW\1/4\ Section 19; NW\1/4\, SW\1/4\ NE\1/4\ 
Section 20; E\1/2\, NE\1/4\ SW\1/4\ Section 22; Section 23; Section 
24 except NE\1/4\; Sections 25-26; Section 27 except N\1/2\ NW\1/4\, 
SW\1/4\ NW\1/4\; SE\1/4\ SE\1/4\, NW\1/4\ NW\1/4\ Section 28; 
Sections 29-32; W\1/2\ W\1/2\, E\1/2\ E\1/2\ Section 33; Section 34; 
N\1/2\, W\1/2\ SW\1/4\ Section 35; N\1/2\ N\1/2\ Section 36.
    T.36S., R.12 \1/2\W. Willamette Meridian: Section 1 except SE\1/
4\ NE\1/4\, SE\1/4\; S\1/2\, NW\1/4\ Section 12; NW\1/4\, N\1/2\ 
NE\1/4\ Section 13; W\1/2\ Section 24; W\1/2\ Section 25; W\1/2\ 
NW\1/4\ Section 36.
    T.37S., R.12W. Willamette Meridian: NW\1/4\ NW\1/4\ Section 1; 
Section 2 except SE\1/4\, SE\1/4\ SW\1/4\; Section 3 except NW\1/4\ 
SW\1/4\; Section 4 except NE\1/4\ SE\1/4\; N\1/2\ N\1/2\, S\1/2\ 
NW\1/4\ Section 5; Section 6 except S\1/2\, SE\1/4\ NW\1/4\; NE\1/
4\, E\1/2\ SE\1/4\, N\1/2\ NW\1/4\ Section 9; W\1/2\, NW\1/4\ NE\1/
4\ Section 10.
    T.37S., R.13W. Willamette Meridian: W\1/2\, N\1/2\ NE\1/4\ 
Section 5; Sections 6-8; W\1/2\ W\1/2\, NE\1/4\ SW\1/4\, SE\1/4\ 
NW\1/4\ Section 9; W\1/2\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\ Section 
17; Section 18; N\1/2\ NE\1/4\, NW\1/4\, W\1/2\ SW\1/4\ Section 19; 
NW\1/4\ NW\1/4\ Section 20; NW\1/4\ NW\1/4\ Section 30.
    T.37S., R.14W. Willamette Meridian: Section 1 except SW\1/4\ 
SW\1/4\; E\1/2\ SE\1/4\, NE\1/4\ Section 2; E\1/2\ Section 11; 
Section 12 except W\1/2\ NW\1/4\, N\1/2\ SW\1/4\; SE\1/4\, N\1/2\ 
N\1/2\ Section 13; Section 24 except NW\1/4\ NE\1/4\.
    T.37S., R.12 \1/2\W. Willamette Meridian: Section 1 except N\1/
2\ NW\1/4\, S\1/2\ SW\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.068

    Map and description of OR-07-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Gold Beach, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.37S., R.12W. Willamette Meridian: E\1/2\ SW\1/4\, W\1/2\ SE\1/
4\, SE\1/4\ SE\1/4\ Section 17; SE\1/4\ SE\1/4\ Section 18; Section 
19 except N\1/2\ NW\1/4\; Section 20; W\1/2\ W\1/2\ Section 21; S\1/
2\ SE\1/4\, SW\1/4\, NW\1/4\, NW\1/4\ SE\1/4\ Section 28; Sections 
29-33; W\1/2\, NW\1/4\ SE\1/4\, SW\1/4\ NE\1/4\ Section 34; S\1/2\ 
SE\1/4\, SE\1/4\ SW\1/4\ Section 35.
    T.37S., R.13W. Willamette Meridian: SE\1/4\, E\1/2\ SW\1/4\, 
S\1/2\ NE\1/4\ Section 24; Section 25; Section 26 except NE\1/4\ 
NW\1/4\, NW\1/4\ NE\1/4\; E\1/2\ E\1/2\ Section 27; SE\1/4\, E\1/2\ 
NE\1/4\, E\1/2\ SW\1/4\ Section 34; Sections 35-36.
    T.37S., R.12 \1/2\W. Willamette Meridian: Section 24 except 
NW\1/4\ NW\1/4\; Sections 24-25; Section 36.
    T.37 \1/2\S. R.11W. Willamette Meridian: W\1/2\ SW\1/4\, SW\1/4\ 
NW\1/4\ Section 31.
    T.37 \1/2\S. R.12.W. Willamette Meridian: Section 25 except E\1/
2\; Section 26 except E\1/2\ NW\1/4\; Sections 27-32; Section 33 
except S\1/2\ SW\1/4\; Sections 34-35; Section 36 except N\1/2\ 
NE\1/4\.
    T.38S., R.11W. Willamette Meridian: Section 6 except N\1/2\ 
NE\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\; W\1/2\, W\1/2\ SE\1/4\, 
Section 7; NW\1/4\, W\1/2\ SW\1/4\, NW\1/4\ NE\1/4\ Section 18.
    T.38S., R.12W. Willamette Meridian: Sections 1-2; Section 3 
except W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\; NE\1/4\ NE\1/4\ Section 4; 
NW\1/4\, W\1/2\ NE\1/4\ Section 5; Section 6; N\1/2\ NW\1/4\ Section 
7; S\1/2\ S\1/2\, NE\1/4\, N\1/2\ SE\1/4\, NE\1/4\ SW\1/4\ Section 
9; Sections 10-12; N\1/2\ N\1/2\, S\1/2\ NE\1/4\, NW\1/4\ SE\1/4\ 
Section 13; N\1/2\, N\1/2\ S\1/2\ Section 14; Sections 15-16; E\1/2\ 
SE\1/4\ Section 17; E\1/2\ E\1/2\ Section 20; Section 21; W\1/2\ 
W\1/2\, NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\ Section 22; W\1/2\ Section 
27; Section 28; Section 29 except NW\1/4\ NW\1/4\; S\1/2\ SE\1/4\ 
Section 30; N\1/2\ NE\1/4\ Section 31; Section 32; Section 33 except 
S\1/2\ SE\1/4\; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 34.
    T.38S., R.13W. Willamette Meridian: Sections 1-2; SE\1/4\ SE\1/
4\ Section 3; E\1/2\ E\1/2\, SW\1/4\ SE\1/4\ Section 10; Sections 
11-13; Section 14 except S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\; NE\1/4\ 
Section 15; N\1/2\ N\1/2\ Section 24.
    T.39S., R.12W. Willamette Meridian: N\1/2\ NW\1/4\, SE\1/4\ 
NW\1/4\, NE\1/4\ SW\1/4\, NE\1/4\ NE\1/4\ Section 5.
[GRAPHIC] [TIFF OMITTED] TR24MY96.069

    Map and description of OR-07-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Gold Beach and Grants Pass, Oregon; 
1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.38S., R.11W. Willamette Meridian: S\1/2\ SE\1/4\, NE\1/4\ 
SE\1/4\, SE\1/4\ NE\1/4\ Section 31.
    T.39S., R.11W. Willamette Meridian: SW\1/4\, SW\1/4\ SE\1/4\ 
Section 4; S\1/2\, S\1/2\ NW\1/4\ Section 5; E\1/2\, E\1/2\ W\1/2\ 
Section 6; Section 7 except NW\1/4\ NW\1/4\; Section 8 except SW\1/
4\ SW\1/4\; Section 9; W\1/2\ W\1/2\, E\1/2\ SW\1/4\ Section 10; 
NW\1/4\, SW\1/4\ SW\1/4\ Section 15; Section 16 except NW\1/4\ SW\1/
4\, SW\1/4\ NW\1/4\; N\1/2\ NE\1/4\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\ 
Section 17; Section 18 except N\1/2\ NE\1/4\; Sections 19-20; 
Section 21 except SE\1/4\ SE\1/4\; W\1/2\ NW\1/4\ Section 22; NW\1/
4\ NW\1/4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\ Section 
29; Sections 30-32; SW\1/4\, S\1/2\ NW\1/4\, W\1/2\ SE\1/4\ Section 
33.
    T.39S., R.12W. Willamette Meridian: S\1/2\ S\1/2\ Section 1; 
S\1/2\ S\1/2\, N\1/2\ SE\1/4\ Section 2; S\1/2\ Section 3; Section 
10 except SE\1/4\ SE\1/4\; Section 11 except S\1/2\ SW\1/4\; Section 
12; Section 13 except SW\1/4\, SW\1/4\ NW\1/4\; NE\1/4\ NE\1/4\ 
Section 14; W\1/2\, W\1/2\ E\1/2\, E\1/2\ SE\1/4\ Section 19; S\1/
2\, E\1/2\ NE\1/4\ Section 20; Section 21; S\1/2\ S\1/2\, NW\1/4\ 
SW\1/4\, W\1/2\ NW\1/4\, NE\1/4\ SE\1/4\ Section 22; S\1/2\, S\1/2\ 
N\1/2\ Section 23; Sections 24-36.
    T.39S., R.13W. Willamette Meridian: Section 33.
    T.40S., R.09W. Willamette Meridian: SW\1/4\ Section 4; S\1/2\, 
S\1/2\ NW\1/4\ Section 5; SE\1/4\, SE\1/4\ NE\1/4\ Section 6; 
Section 7 except S\1/2\ SE\1/4\; Section 8 except S\1/2\ S\1/2\; 
N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 9; W\1/2\ NW\1/4\, NE\1/4\ 
NW\1/4\ Section 18; Section 19 except E\1/2\ NW\1/4\, NE\1/4\ SW\1/
4\; SW\1/4\, S\1/2\ NW\1/4\ Section 20; S\1/2\ SE\1/4\ Section 21; 
Section 27 except NE\1/4\ NE\1/4\; Section 28; SE\1/4\, SE\1/4\ 
SW\1/4\, SE\1/4\ NE\1/4\, NE\1/4\ NW\1/4\ Section 29; Section 30 
except E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\, SW\1/4\ SE\1/4\, SE\1/4\ 
SW\1/4\; S\1/2\, W\1/2\ NW\1/4\ Section 31; Section 32 except NW\1/
4\ NW\1/4\; Section 33; Section 34 except E\1/2\ SE\1/4\, SE\1/4\ 
NE\1/4\, SW\1/4\ SE\1/4\.

[[Page 26309]]

    T.40S., R.10W. Willamette Meridian: SW\1/4\ SW\1/4\ Section 1; 
SE\1/4\, S\1/2\ SW\1/4\, E\1/2\ NE\1/4\ Section 2; S\1/2\ SW\1/4\ 
Section 3; SE\1/4\ SE\1/4\ Section 4; SE\1/4\, S\1/2\ NE\1/4\ 
Section 8; Section 9 except N\1/2\ NW\1/4\; Sections 10-11; Section 
12 except NW\1/4\ NE\1/4\; Sections 13-16; Section 17 except N\1/2\ 
NW\1/4\, SW\1/4\ NW\1/4\; Section 19 except NW\1/4\, NW\1/4\ SW\1/
4\, NW\1/4\ NE\1/4\; Sections 20-36.
    T.40S., R.11W. Willamette Meridian: N\1/2\ NW\1/4\, SW\1/4\ 
NW\1/4\, NW\1/4\ NE\1/4\ Section 4; Sections 5-8; W\1/2\ NW\1/4\, 
S\1/2\ SE\1/4\, SW\1/4\ Section 9; Section 16 except E\1/2\ E\1/2\; 
Sections 17-21; E\1/2\ SE\1/4\, SW\1/4\ SE\1/4\ Section 25; Section 
27 except E\1/2\, NE\1/4\ NW\1/4\; Sections 28-33; W\1/2\ Section 
34; SE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ Section 35; Section 36.
    T.40S., R.12W. Willamette Meridian: Sections 1-30; Section 31 
except W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\; Sections 32-36.
    T.40S., R.13W. Willamette Meridian: Section 4 except SE\1/4\ 
SE\1/4\; W\1/2\, NW\1/4\ NE\1/4\, S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\ 
Section 9; W\1/2\, NE\1/4\ Section 10; SE\1/4\ SW\1/4\ Section 12; 
N\1/2\ NW\1/4\ Section 13.
    T.41S., R.09W. Willamette Meridian: Sections 4-8; Sections 17-
18.
    T.41S., R.10W. Willamette Meridian: Sections 1-18.
    T.41S., R.11W. Willamette Meridian: Section 1; Section 2 except 
NW\1/4\ NE\1/4\, NE\1/4\ NW\1/4\; Sections 3-15; Sections 17-18.
    T.41S., R.12W. Willamette Meridian: Sections 1-4; Section 5 
except W\1/2\, SW\1/4\ SE\1/4\; Section 7 except NW\1/4\, W\1/2\ 
SW\1/4\, NW\1/4\ NE\1/4\; W\1/2\, S\1/2\ SE\1/4\ Section 8; Section 
9 except S\1/2\ S\1/2\, NW\1/4\ SW\1/4\; Section 10; Section 11 
except SE\1/4\ SW\1/4\, W\1/2\ SW\1/4\; Sections 12-13; Section 14 
except NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\; Section 15; Section 17; 
Section 18 except W\1/2\ W\1/2\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.070

    Map and description of OR-07-f taken from United States Fish and 
Wildlife Service 1:100,000 map; Port Orford, Canyonville, Gold Beach 
and Grants Pass, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.32S., R.09W. Willamette Meridian: Section 34.
    T.32S., R.10W. Willamette Meridian: Section 25; E\1/2\, NE\1/4\ 
NW\1/4\, SE\1/4\ SW\1/4\ Section 26; Section 35 except W\1/2\ NW\1/
4\; Section 36 except SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\.
    T.33S., R.09W. Willamette Meridian: Section 2; Sections 3-4; 
Section 5 except SE\1/4\ NW\1/4\, E\1/2\ SW\1/4\; Section 6 except 
SE\1/4\; Section 7 except E\1/2\ NW\1/4\, W\1/2\ NE\1/4\; Section 8 
except NE\1/4\ NW\1/4\; Sections 9-10; Sections 17-19.
    T.33S., R.10W. Willamette Meridian: Section 1 except NE\1/4\, 
N\1/2\ SW\1/4\, S\1/2\ NW\1/4\; Section 2 except NE\1/4\ SE\1/4\; 
Section 3 except NW\1/4\, N\1/2\ NE\1/4\, SW\1/4\ SW\1/4\, N\1/2\ 
SW\1/4\; Section 9 except W\1/2\, N\1/2\ NE\1/4\, SW\1/4\ SE\1/4\; 
Section 10; Section 11 except NE\1/4\ NW\1/4\; Section 12 except 
NW\1/4\, SE\1/4\ NE\1/4\; Sections 13-14; Section 15 except W\1/2\ 
SW\1/4\; Section 21 except W\1/2\; Sections 22-24; Sections 26-27; 
Section 28 except N\1/2\ NW\1/4\; Section 29 except NW\1/4\ SW\1/4\; 
SE\1/4\ SE\1/4\ Section 30; Section 31 except W\1/2\, W\1/2\ SE\1/
4\; Sections 32-34.
    T.34S., R.10W. Willamette Meridian: Sections 4-5; Section 6 
except NW\1/4\ NE\1/4\, N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\; Sections 7-
8; Section 18.
    T.34S., R.10 \1/2\W. Willamette Meridian:S\1/2\ Section 7; 
Section 18 except NW\1/4\ NW\1/4\; Sections 19; Sections 30-31.
    T.34S., R.11W. Willamette Meridian: E\1/2\ SE\1/4\, SE\1/4\ 
NE\1/4\ Section 11; Section 12 except E\1/4\; Section 13 except 
NE\1/4\; E\1/2\ E\1/2\, SW\1/4\ SW\1/4\ Section 14; SE\1/4\ SE\1/4\ 
Section 15; Section 21 except N\1/2\, E\1/2\ SE\1/4\, NW\1/4\ SW\1/
4\; Section 22 except NW\1/4\, W\1/2\ NE\1/4\, NW\1/4\ SE\1/4\, N\1/
2\ SW\1/4\, SW\1/4\ SW\1/4\; Section 23 except NE\1/4\ NW\1/4\, 
NW\1/4\ NE\1/4\; Sections 24-28; S\1/2\ NE\1/4\, SE\1/4\ Section 31; 
Section 32 except N\1/2\ NW\1/4\; Sections 33-36.
    T.35S., R.10 \1/2\W. Willamette Meridian: Section 6; Section 7 
except E\1/2\ E\1/2\, W\1/2\ SE\1/4\, NE\1/4\ SW\1/4\; Section 18 
except E\1/2\, E\1/2\ SW\1/4\; NW\1/4\, W\1/2\ SW\1/4\, NW\1/4\ 
NE\1/4\ Section 19; W\1/2\ SW\1/4\ Section 30; Section 31.
    T.35S., R.11W. Willamette Meridian: Sections 1-4; Section 5 
except SW\1/4\ SW\1/4\; E\1/2\ NE\1/4\ Section 6; E\1/2\ E\1/2\ 
Section 7; Sections 8-15; Section 17; E\1/2\ NE\1/4\, NW\1/4\ NE\1/
4\ Section 18; Section 20 except SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\; 
Section 21 except SW\1/4\ NE\1/4\; Sections 22-28; NE\1/4\ NW\1/4\, 
E\1/2\ E\1/2\ Section 29; Section 33 except W\1/2\ SW\1/4\; Sections 
34-36.
    T.36S., R.11W. Willamette Meridian: Sections 2-3; N\1/2\ N\1/2\, 
SE\1/4\ NE\1/4\, E\1/2\ SE\1/4\ Section 4; NE\1/4\ NW\1/4\, N\1/2\ 
NE\1/4\ Section 5; E\1/2\ E\1/2\ Section 9; Sections 10-11; Section 
15; E\1/2\ E\1/2\ Section 16.
[GRAPHIC] [TIFF OMITTED] TR24MY96.071

    Map and description of OR-07-g taken from United States Fish and 
Wildlife Service 1:100,000 map; Canyonville, Oregon; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.31S., R.09W. Willamette Meridian: Section 19 except NW\1/4\ 
NW\1/4\, SW\1/4\ SW\1/4\, SW\1/4\ SE\1/4\; Section 29; Section 31; 
Section 33 except NE\1/4\ NE\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.072

    Map and description of CA-01-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Grants Pass, Oregon; Crescent City and 
Happy Camp, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.18N., R.01E. Humboldt Meridian: NW\1/4\ NW\1/4\ Section 1; 
W\1/2\, NE\1/4\, NW\1/4\ SE\1/4\ Section 2; Section 3; E\1/2\ 
Section 4; NE\1/4\, E\1/2\ SE\1/4\ Section 9; Section 10; W\1/2\ 
NE\1/4\, NW\1/4\, SW\1/4\, Section 11; W\1/2\ Section 
FR Doc. 96-12647 Endangered and Threatened Wildlife and Plants; Final Designation of Critical Habitat for the Marbled Murrelet
14; Section 
15; NE\1/4\ NE\1/4\ Section 16; Section 22; NW\1/4\, NW \1/4\ SW\1/
4\ Section 23; N\1/2\, N\1/2\ SW\1/4\, NW\1/4\ SE\1/4\ Section 27.
    T.19N., R.01E. Humboldt Meridian: Section 33 except W\1/2\ SW\1/
4\; Sections 34-35; Section 36 except SE\1/4\ SE\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.073

    Map and description of CA-01-b taken from United States Fish and

[[Page 26310]]

Wildlife Service 1:100,000 map; Crescent City and Happy Camp, 
California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.17N., R.02E. Humboldt Meridian: SW\1/4\ SE\1/4\, SE\1/4\ SW\1/
4\ Section 29; Section 31 except N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\; 
W\1/2\, W\1/2\ NE\1/4\ Section 32.
    T.17N., R.01E. Humboldt Meridian: S\1/2\ SW\1/4\ Section 35; 
SE\1/4\, SE\1/4\ SW\1/4\ Section 36.
    T.16N., R.03E. Humboldt Meridian: S\1/2\ SW\1/4\, NW\1/4\ SW\1/
4\, SW\1/4\ SE\1/4\ Section 17; SE\1/4\, E\1/2\ SW\1/4\, SW\1/4\ 
SW\1/4\, S\1/2\ NE\1/4\, SE\1/4\ NW\1/4\ Section 18; Sections 19-20; 
SW\1/4\, S\1/2\ NW\1/4\, Section 21; W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ 
Section 27; Section 28 except NE\1/4\ NE\1/4\; Sections 29-33; S\1/
2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 34.
    T.16N., R.02E. Humboldt Meridian: W\1/2\, SW\1/4\ SE\1/4\ 
Section 5; Sections 6-8; W\1/2\ Section 9; W\1/2\ NW\1/4\, SW\1/4\, 
S\1/2\ SE\1/4\ Section 16; Section 17; Section 18 except W\1/2\ 
NW\1/4\, SE\1/4\ NW\1/4\; Sections 19-21; Section 22 except N\1/2\ 
NE\1/4\, SE\1/4\ NE\1/4\; SW\1/4\ SW\1/4\ Section 23; S\1/2\, S\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\ Section 25; Section 26 except NE\1/4\ NE\1/
4\; Sections 27-29; N\1/2\ N\1/2\, SE\1/4\ NE\1/4\ Section 30; 
Section 32 except SW\1/4\; Sections 33-36.
    T.16N., R.01E. Humboldt Meridian: Sections 1-2; SE\1/4\, E\1/2\ 
NE\1/4\ Section 3; NE\1/4\, SW\1/4\ NW\1/4\, NE\1/4\ NW\1/4\ Section 
10; N\1/2\, SE\1/2\ SE\1/4\, N\1/2\ S\1/2\ Section 11; Section 12; 
S\1/2\ SE\1/4\ Section 13; NE\1/4\ Section 24.
    T.15N., R.03E. Humboldt Meridian: Sections 2-6; N\1/2\, N\1/2\ 
SW\1/4\ Section 7; SE\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\ Section 
8; Sections 9-10; W\1/2\, W\1/2\ NE\1/4\ Section 11; SW\1/4\ SW\1/4\ 
Section 13; Section 14 except N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\; 
Sections 15-17; Section 18 except NW\1/4\, NW\1/4\ SW\1/4\; NE\1/4\, 
NE\1/4\ NW\1/4\ Section 19; Section 20 except SW\1/4\; Sections 21-
23; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 24; Section 27 except 
E\1/2\ E\1/2\, SW\1/4\ SW\1/4\; Section 28 except S\1/2\, SW\1/4\ 
NE\1/4\, SE\1/4\ NW\1/4\; NE\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ SW\1/4\, 
E\1/2\ NW\1/4\ Section 29.
    T.15N., R.02E. Humboldt Meridian: Sections 1-3; N\1/2\ NW\1/4\, 
NE\1/4\, E\1/2\ SE\1/4\ Section 4; NE\1/4\ NE\1/4\ Section 5; 
Section 10 except W\1/2\ SW\1/4\; Sections 11-12; Section 13 except 
E\1/2\ NE\1/4\, SE\1/4\; Section 14; NE\1/4\, E\1/2\ SE\1/4\, NW\1/
4\ SE\1/4\ Section 15; E\1/2\ SE\1/4\ Section 22; Section 23 except 
SE\1/4\ NE\1/4\, SW\1/4\ SE\1/4\; SW\1/4\ Section 24; Section 25 
except E\1/2\ NE\1/4\; Section 26 except NE\1/4\ NE\1/4\; S\1/2\, 
S\1/2\ N\1/2\ Section 27; SE\1/4\, SE\1/4\ SW\1/4\, S\1/2\ NE\1/4\ 
Section 28; Section 33-34; Section 35 except E\1/2\ E\1/2\.
    T.14N., R.02E. Humboldt Meridian: N\1/2\ NW\1/4\, W\1/2\ W\1/2\, 
NW\1/4\ NE\1/4\ Section 2; Section 3; N\1/2\ N\1/2\, E\1/2\ E\1/2\ 
Section 4; E\1/2\ E\1/2\ Section 9; Section 10; NW\1/4\, N\1/2\ 
SW\1/4\, W\1/2\ NE\1/4\, NW\1/4\ SE\1/4\ Section 11; NW\1/4\ NW\1/4\ 
Section 14; N\1/2\ N\1/2\ Section 15.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.14N., R.03E. Humboldt Meridian: SE\1/4\ SE\1/4\ Section 21; 
SW\1/4\ SW\1/4\ Section 22; W\1/2\ SW\1/4\, W\1/2\ NE\1/4\, NW\1/4\ 
Section 27; Section 28 except NW\1/4\; SE\1/4\ SE\1/4\ Section 29; 
E\1/2\ Section 33 except W\1/2\ W\1/2\, E\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\; W\1/2\ W\1/2\ Section 34.
    T.13N., R.03E. Humboldt Meridian: NW\1/4\ NW\1/4\ Section 3.
    [GRAPHIC] [TIFF OMITTED] TR24MY96.074
    
    Map and description of CA-01-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Happy Camp and Hoopa, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T. 11N., R.06E. Humboldt Meridian: N\1/2\ NW\1/4\, SW\1/4\ NW\1/
4\, W\1/2\ SW\1/4\ Section 30.
    T. 11N., R.05E. Humboldt Meridian: W\1/2\ NE\1/4\, NW\1/4\, E\1/
2\ SW\1/4\, W\1/2\ SE\1/4\ Section 36.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T. 14N., R.05E. Humboldt Meridian: S\1/2\ Section 7; Section 18 
except E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; W\1/2\, NW\1/4\ NE\1/4\ 
Section 19; W\1/2\ SW\1/4\, NW\1/4\ NW\1/4\ Section 30; Section 31 
except NE\1/4\, NE\1/4\ NW\1/4\; SW\1/4\ SW\1/4\ Section 32.
    T. 14N., R.04E. Humboldt Meridian: SE\1/4\, SE\1/4\ SW\1/4\ 
Section 12; Section 13 except W\1/2\ W\1/2\, Sections 24-25; E\1/2\ 
NE\1/4\ Section 26; SE\1/4\, E\1/2\ NE\1/4\ Section 35; Section 36.
    T. 13N., R.05E. Humboldt Meridian: SW\1/4\, W\1/2\ NW\1/4\, 
NE\1/4\ NW\1/4\, W\1/2\ SE\1/4\ Section 5; Sections 6-7; Section 8 
except NE\1/4\, NE\1/4\ SE\1/4\; S\1/2\ S\1/2\ Section 9; E\1/2\ 
SW\1/4\, SW\1/4\ SW\1/4\, W\1/2\ SE\1/4\ Section 10; NW\1/4\, N\1/2\ 
SW\1/4\, W\1/2\ NE\1/4\, NW\1/4\ SE\1/4\, SE\1/4\ SE\1/4\ Section 
15; Section 16 except SE\1/4\ SE\1/4\; Sections 17-21; Section 22 
except SE\1/4\ SE\1/4\; N\1/2\ NW\1/4\ Section 27; N\1/2\ NW\1/4\, 
NW\1/4\ NE\1/4\ Section 28; Section 29 except E\1/2\ SE\1/4\; 
Sections 30-31, Section 32 except E\1/2\ NE\1/4\; S\1/2\ SE\1/4\ 
Section 35; SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 36.
    T. 13N., R.04E. Humboldt Meridian: Section 1; Section 2 except 
NW\1/4\; S\1/2\ SE\1/4\ Section 3; SE\1/4\ SE\1/4\ Section 9; 
Section 10 except NW\1/4\ NW\1/4\; Sections 11-15; E\1/2\ E\1/2\ 
Section 16; SE\1/4\, S\1/2\ NE\1/4\, NE\1/4\ NE\1/4\, S\1/2\ SW\1/4\ 
Section 21; Sections 22-28; Section 29 except N\1/2\ N\1/2\; Section 
30 except N\1/2\ N\1/2\; Sections 31-36.
    T. 13N., R.03E. Humboldt Meridian: S\1/2\ Section 25; S\1/2\ 
SE\1/4\ Section 26; Section 35 except W\1/2\ NW\1/4\; Section 36.
    T. 12N., R.06E. Humboldt Meridian: W1/2 SW\1/4\ Section 6; SW\1/
4\ Section 7; W\1/2\, W\1/2\ SE\1/4\ Section 18; N\1/2\ NW\1/4\, 
NW\1/4\ NE\1/4\ Section 19.
    T. 12N., R.05E. Humboldt Meridian: Section 1; Section 2 except 
NW\1/4\, NW\1/4\ SW\1/4\; S\1/2\ S\1/2\, NW\1/4\ SW\1/4\ Section 3; 
Section 4 except N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\; Sections 5-11; 
Section 12 except S\1/2\ NE\1/4\; Sections 13-23; Section 24 except 
E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; Section 25 except E\1/2\ NE\1/4\; 
Sections 26-36.
    T. 12N., R.04E. Humboldt Meridian: Sections 1-36.
    T. 12N., R.03E. Humboldt Meridian: Sections 1-2; Section 3 
except NW\1/4\, W\1/2\ SW\1/4\, W\1/2\ NE\1/4\, NE\1/4\ NE\1/4\; 
Section 10 except W\1/2\ W\1/2\, NE\1/4\ NW\1/4\; Sections 11-14, 
Section 15 except W\1/2\ W\1/2\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/4\; 
SW\1/4\ SE\1/4\ Section 22; Section 23 except SW\1/4\ SW\1/4\; 
Section 24; Section 25 except SW\1/4\ SE\1/4\; N\1/2\ NE\1/4\, SE\1/
4\ NE\1/4\ Section 26.
    T. 11N., R.06E. Humboldt Meridian: SW\1/4\, W\1/2\ NW\1/4\, 
Section 6; W\1/2\ Section 7; NW\1/4\ NW\1/4\ Section 18; SW\1/4\, 
SW\1/4\ NW\1/4\ Section 19.
    T. 11N., R.05E. Humboldt Meridian: Sections 1-25; Section 26 
except SW\1/4\, SW\1/4\ SE\1/4\; NE\1/4\ NE\1/4\, Section 27; 
Section 28 except SE\1/4\ SE\1/4\; Sections 29-32; Section 33 except 
NE\1/4\, E\1/2\ NW\1/4\; W\1/2\ SW\1/4\ Section 34.
    T. 11N., R.04E. Humboldt Meridian: Sections 1-30, Section 31 
except SW\1/4\, S\1/2\ NW\1/4\; Sections 32-36.
    T. 10N., R.05E. Humboldt Meridian: W\1/2\ SW\1/4\ Section 2; 
Section 3 except NE\1/4\, Sections 4-9, Section 10 except S\1/2\, 
SW\1/4\ NW\1/4\; N\1/2\ NW\1/4\ Section 11; Section 16 except SE\1/
4\, SE\1/4\ SW\1/4\; Section 17-18; Section 19 except SE\1/4\, SE\1/
4\ SW\1/4\, SE\1/4\ NE\1/4\; N\1/2\ NW\1/4\ Section 20; W\1/2\ W\1/
2\, SE\1/4\ SW\1/4\ Section 30.
    T. 10N., R.04E. Humboldt Meridian: Sections 1-3; Sections 10-15; 
Sections 22-27.

[[Page 26311]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.075

    Map and description of CA-01-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Happy Camp California; 1995.

    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:
    T.17N., R.03E. Humboldt Meridian: NE\1/4\, E\1/2\ SE\1/4\ 
Section 24; E\1/2\ NE\1/4\, SE\1/4\, Section 25; N\1/2\, E\1/2\ 
SE\1/4\ Section 36.
    T.16N., R.03E. Humboldt Meridian: S\1/2\ SW\1/4\, SE\1/4\, NE\1/
4\ SW\1/4\ Section 1; E\1/2\ E\1/2\ Section 11; Section 12; Section 
13 except W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\; NE\1/4\, E\1/2\ NW\1/4\, 
E\1/2\ SE\1/4\ Section 24; SE\1/4\, SE\1/4\ NE\1/4\ Section 25; 
Section 36 except SW\1/4\, NW\1/4\ NW\1/4\, W\1/2\ SE\1/4\.
    T.15N., R.07E. Humboldt Meridian: SW\1/4\ NW\1/4\, NW\1/4\ SW\1/
4\ Section 7.
    T.15N., R.06E. Humboldt Meridian: NW\1/4\ Section 13.
    T.15N., R.03E. Humboldt Meridian: E\1/2\ E\1/2\ Section 1; E\1/
2\, SE\1/4\ Section 12.
    T.14N., R.06E. Humboldt Meridian: N\1/2\ NW\1/4\, SW\1/4\ NW\1/
4\, W\1/2\ SE\1/4\ Section 4; Section 5; Section 8; SW\1/4\, S\1/2\ 
NW\1/4\, NW\1/4\ NW\1/4\ Section 9; W\1/2\ Section 16; Section 17; 
N\1/2\ Section 20; Section 21 except S\1/2\ SW\1/4\, N\1/2\ NE\1/4\ 
Section 21.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.18N., R.04E. Humboldt Meridian: SE\1/4\ SW\1/4\, SW\1/4\ SE\1/
4\ Section 33; E\1/2\ SE\1/4\ Section 35; SW\1/4\, SW\1/4\ SE\1/4\, 
S\1/2\ NW\1/4\ Section 36.
    T.17N., R.06E. Humboldt Meridian: S\1/2\ SW\1/4\, SW\1/4\ SE\1/
4\ Section 14; S\1/2\ SW\1/4\, NE\1/4\ SE\1/4\ Section 15; S\1/2\ 
SE\1/4\ Section 16; E\1/2\ Section 21; Section 22; Section 23 except 
NE\1/4\ NE\1/4\; W\1/2\ SW\1/4\ Section 24; Section 26 except E\1/2\ 
SE\1/4\; Section 27 except SW\1/4\, W\1/2\ SE\1/4\, SE\1/4\ NW\1/4\; 
NE\1/4\ NE\1/4\ Section 28.
    T.17N., R.05E. Humboldt Meridian: SW\1/4\, SW\1/4\ NW\1/4\ 
Section 4; Section 5 except N\1/2\ N\1/2\, SW\1/4\ NW\1/4\; Section 
6 except NE\1/4\; Section 7 except S\1/2\ SE\1/4\, SW\1/4\ SE\1/4\; 
Section 8 except SE\1/4\ SE\1/4\; W\1/2\ NW\1/4\ Section 9.
    T.17N., R.04E. Humboldt Meridian: Section 1 except SW\1/4\, 
SW\1/4\ NW\1/4\; Section 2 except NE\1/4\ NE\1/4\, N\1/2\ NW\1/4\, 
E\1/2\ SE\1/4\; Section 3 except N\1/2\ N\1/2\; Section 4; SE\1/4\ 
NE\1/4\, SE\1/4\ Section 5; Section 8 except NW\1/4\; Sections 9-10; 
NE\1/4\, NW\1/4\, NW\1/4\ SW\1/4\ Section 11; NE\1/4\ Section 12; 
Sections 16-17; W\1/2\, W\1/2\ E\1/2\ Section 20; SE\1/4\, NE\1/4\ 
SW\1/4\ Section 21; S\1/2\, S\1/2\ N\1/2\ Section 22; S\1/2\, S\1/2\ 
N\1/2\ Section 23; W\1/2\ SW\1/4\ Section 24; W\1/2\ NW\1/4\, NW\1/
4\ SW\1/4\ Section 25; Section 26; Section 27 except SW\1/4\; NE\1/
4\, SW\1/4\, SW\1/4\ SE\1/4\ Section 28; Section 29 except E\1/2\ 
NE\1/4\; SW\1/4\, W\1/2\ SE\1/4\ Section 32; Section 33; N\1/2\ 
NE\1/4\, SW\1/4\, SE\1/4\ Section 34; N\1/2\, N\1/2\ SE\1/4\, SW\1/
4\ SW\1/4\ Section 35.
    T.16N., R.04E. Humboldt Meridian: S\1/2\ SW\1/4\, W\1/2\ SE\1/4\ 
Section 1; Section 2 except NE\1/4\; Sections 3-4; Section 5 except 
N\1/2\ NW\1/4\; Section 8; W\1/2\ W\1/2\, NE\1/4\ NE\1/4\ Section 9; 
Section 10 except W\1/2\ SW\1/4\; Section 11 except SE\1/4\, S\1/2\ 
SW\1/4\; S\1/2\ Section 12; E\1/2\ E\1/2\ Section 17; E\1/2\ E\1/2\ 
Section 20; Section 29 except SE\1/4\, E\1/2\ NE\1/4\; W\1/2\ 
Section 32.
    T.15N., R.06E. Humboldt Meridian: W\1/2\ SW\1/4\ Section 2; S\1/
2\ Section 3; N\1/2\, E\1/2\ Section 4; SE\1/4\ Section 9; Section 
10 except W\1/2\ NW\1/4\, E\1/2\ SE\1/4\, S\1/2\ NW\1/4\ Section 11; 
NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\ Section 12; NW\1/4\ Section 13; 
SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\ Section 14; N\1/2\ NW\1/4\ Section 
15; NW\1/4\, N\1/2\ SW\1/4\, NW\1/4\ NE\1/4\ Section 16; NE\1/4\ 
NE\1/4\, N\1/2\ SE\1/4\, NE\1/4\, SE\1/4\ NW\1/4\ Section 17; SW\1/
4\, S\1/2\ NW\1/4\, NW\1/4\ SE\1/4\ Section 29; S\1/2\ SW\1/4\ 
Section 30.
    T.15N., R.05E. Humboldt Meridian: SE\1/4\ Section 20; S\1/2\ 
Section 21; S\1/2\ SW\1/4\ Section 22; S\1/2\ NE\1/4\, NE\1/4\ SW\1/
4\, SE\1/4\ Section 25; NW\1/4\ Section 27; Section 28 except E\1/2\ 
SE\1/4\; NW\1/4\, NW\1/4\ SW\1/4\ Section 29; SE\1/4\ SE\1/4\ 
Section 30; E\1/2\ NE\1/4\, SE\1/4\ Section 31; Sections 32-33; 
Section 34 except N\1/2\ N\1/2\, E\1/2\ NE\1/4\ Section 34; E\1/2\, 
SW\1/4\ SW\1/4\, E\1/2\ SW\1/4\ Section 35; Section 36.
    T.15N., R.04E. Humboldt Meridian: W\1/2\ Section 6; W\1/2\ NW\1/
4\ Section 7.
    T.14N., R.05E. Humboldt Meridian: Sections 1-4; E\1/2\ SE\1/4\, 
NE\1/4\, N\1/2\ NW\1/4\ Section 5; NE\1/4\, E\1/2\ NW\1/4\ Section 
6; NE\1/4\, NE\1/4\ NW\1/4\, N\1/2\ SE\1/4\ Section 8; Section 9 
except S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\; Section 10; Section 11 
except S\1/2\ SE\1/4\, SE\1/4\ SW\1/4\; Section 12 except W\1/2\ 
SW\1/4\; W\1/2\, NE\1/4\ NW\1/4\ Section 13; N\1/2\ NE\1/4\, NW\1/4\ 
Section 15; NE\1/4\ Section 24.
[GRAPHIC] [TIFF OMITTED] TR24MY96.076

    Map and description of CA-01-e taken from United States Fish and 
Wildlife Service 1:100,000 map; Grants Pass, Oregon; Happy Camp, 
California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.41S., R.07W. Willamette Meridian: S\1/2\ SW\1/4\, NW\1/4\ 
SW\1/4\ Section 6; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 7; SE\1/
4\, S\1/2\ NE\1/4\ Section 8; S\1/2\ SE\1/4\, W\1/2\ Section 9; 
Section 16; E\1/2\ E\1/2\ Section 17.
    T.41S., R.08W. Willamette Meridian: Section 1 except SE\1/4\ 
NW\1/4\, W\1/2\ SW\1/4\; Section 2 except SE\1/4\ SE\1/4\; Section 
4; Section 9 except W\1/2\ W\1/2\; Section 11 except NE\1/4\ NE\1/
4\; Section 12 except E\1/2\ SE\1/4\; Section 13 except NE\1/4\; 
Sections 14-16; E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 17.
    T.19N., R.06E. Humboldt Meridian: E\1/2\ SE\1/4\, SW\1/4\ SE\1/
4\ Section 31; Section 32 except NW\1/4\ NW\1/4\; NW \1/4\, W\1/2\ 
NE\1/4\, N\1/2\ SW\1/4\ Section 33.
    T.19N., R.05E. Humboldt Meridian: Section 32 except S\1/2\ SW\1/
4\; Section 33; Section 34 except E\1/2\ SE\1/4\; Section 35 except 
S\1/2\ SW\1/4\; W\1/2\ NW\1/4\ Section 36.
    T.19N., R.04E. Humboldt Meridian: Sections 32-34; SW\1/4\ SW\1/
4\ Section 35.
    T.18N., R.05E. Humboldt Meridian: Section 5 except NW\1/4\, W\1/
2\ NE\1/4\; SE\1/4\, E\1/2\ SW\1/4\ Section 6; Section 7 except S\1/
2\ S\1/2\, NW\1/4\ SW\1/4\; Sections 16-17; SE\1/4\, S\1/2\ N\1/2\, 
NW\1/4\ NW\1/4\, Section 18; N\1/2\ Section 19.
    T.18N., R.04E. Humboldt Meridian: W\1/2\ NW\1/4\ Section 2; 
Section 3 except SE\1/4\ SE\1/4\, Section 4; N\1/2\ N\1/2\, SW\1/4\ 
NE\1/4\ Section 9.
    T.18N., R.03E. Humboldt Meridian: Section 1; SE\1/4\, E\1/2\ 
NE\1/4\, NE\1/4\ NE\1/4\, SE\1/4\ SW\1/4\ Section 2; SE\1/4\ SE\1/4\ 
Section 10; Section 11 except NW\1/4\ NW\1/4\; NW\1/4\ NE\1/4\, 
NE\1/4\ NW\1/4\ Section 12; W\1/2\ NW\1/4\ Section 14; E\1/2\, E\1/
2\ SW\1/4\ Section 15; W\1/2\, NW\1/4\ SE\1/4\, N\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\ Section 22; W\1/2\ Section 27; SE\1/4\, S\1/2\ NE\1/
4\, NE\1/4\ NE\1/4\, E\1/2\ SW\1/4\ Section 28; E\1/2\ SE\1/4\, 
SE\1/4\ NE\1/4\ Section 32; Section 33; W\1/2\ Section 34.
    T.17N., R.03E. Humboldt Meridian: NW\1/4\, NW\1/4\ SW\1/4\ 
Section 3; Section 4 except S\1/2\ S\1/2\, NW\1/4\ SW\1/4\; NE\1/4\ 
NE\1/4\ Section 5.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.18N., R.06E. Humboldt Meridian: Section 5 except E\1/2\ E\1/
2\; E\1/2\ NE\1/4\; SE\1/4\ SW\1/4\, SE\1/4\ Section 6; Section 7; 
Section 8 except E\1/2\ NE\1/4\; Section 17 except E\1/2\ SE\1/4\; 
Sections 18-19; W\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, W\1/2\ SW\1/4\ 
Section 20; Section 30 except E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\; 
Section 31 except E\1/2\ E\1/2\, SW\1/4\ SE\1/4\.
    T.18N., R.05E. Humboldt Meridian: Section 1 except N\1/2\ NE\1/
4\; Sections 2-4; Sections 8-12; Section 13 except SW\1/4\, SW\1/4\ 
NW\1/4\, SW\1/4\ SE\1/4\; Section 14 except SE\1/4\, S\1/2\ NE\1/4\; 
Section 15; Section 20 except SW\1/4\; Section 21 except S\1/2\ SE 
\1/4\; Section 22 except SW\1/4\ SE\1/4\, S\1/2\ SW\1/4\;

[[Page 26312]]

NW\1/4\, NW\1/4\ SW\1/4\, SW\1/4\ SW\1/4\ Section 23; S\1/2\ SE\1/
4\, NE\1/4\ SE\1/4\, E\1/2\ NE\1/4\ Section 24; Section 25 except 
S\1/2\ SW\1/4\, NW\1/4\ NW\1/4\; W\1/2\ SW\1/4\, NW\1/4\, SE\1/4\ 
SW\1/4\ Section 28; E\1/2\ Section 29; E\1/2\ Section 32; NW\1/4\, 
N\1/2\ SW\1/4\ Section 33; E\1/2\, SE\1/4\ SW\1/4\ Section 36.
    T.18N., R.04E. Humboldt Meridian: Section 5; N\1/2\ N\1/2\ 
Section 8.
[GRAPHIC] [TIFF OMITTED] TR24MY96.077

    Map and description of CA-02-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Crescent City, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.14N., R.01E. Humboldt Meridian: S\1/2\ NE\1/4\, S\1/2\, SE\1/
4\ NW\1/4\ Section 21; W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\ Section 22; 
NW\1/4\, NW\1/4\, NW\1/4\ SW\1/4\ Section 27; Section 28 except W\1/
2\ SW\1/4\, SE\1/4\ SW\1/4\, S\1/2\ SE\1/4\.
    T.17N., R.01E. Humboldt Meridian: SW\1/4\ SW\1/4\ Section 21; 
W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 28; E\1/2\ NE\1/4\ Section 
29.

    Critical Habitat includes only State lands described within the 
following areas:

    T.14N., R.01W. Humboldt Meridian: Section 1 above Mean High 
Water (MHW).
    T.14N., R.01E. Humboldt Meridian: W\1/2\ Section 6; W\1/2\ 
Section 7; Sections 18-19 above MHW.
    T.15N., R.01E. Humboldt Meridian: S\1/2\ Section 7; W\1/2\ 
Section 8; NW\1/4\, W\1/2\ NE\1/4\ Section 17; Sections 18-19; W\1/
2\, N\1/2\ NE\1/4\ Section 30; W\1/2\ Section 31.
    T.15N., R.01W. Humboldt Meridian: SE\1/4\, S\1/2\ SW\1/4\ 
Section 1; Section 12 except W\1/2\ NE\1/4\; S\1/2\, NE\1/4\, NE\1/
4\ NW\1/4\ Section 13; Section 23 above MHW, Section 24, Sections 
25-26 above MHW; Section 36 above MHW.
    T.16N., R.01E. Humboldt Meridian: NW\1/4\ Section 4; Sections 5-
7; Section 8 except NE\1/4\ SE\1/4\; SW\1/4\ NW\1/4\ NW\1/4\ SW\1/4\ 
Section 9; NW\1/4\ Section 15; W\1/2\, NE\1/4\ Section 16; Sections 
17-20; W\1/2\, W\1/2\ SE\1/4\ Section 21.
    T.16N., R.01W. Humboldt Meridian: Section 1; SE\1/4\ SE\1/4\ 
Section 2; E\1/2\ NE\1/4\ Section 11; Sections 12-13; E\1/2\ E\1/2\ 
Section 14; SE\1/4\, E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, S\1/2\ NW\1/4\ 
Section 23; Section 24.
    T.17N., R.01E. Humboldt Meridian: SW\1/4\, W\1/2\ SE\1/4\ 
Section 30, Section 31 except E\1/2\ NE\1/4\, NE\1/4\ SE\1/4\.
    T.17N., R.01W. Humboldt Meridian: SE\1/4\ SE\1/4\ Section 25; 
S\1/2\, E\1/2\ NE\1/4\ Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.078

    Map and description of CA-02-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Orick and Hoopa, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.11N., R.01E. Humboldt Meridian: Sections 1-2 N\1/2\ N\1/2\ 
Section 3; Section 4 except E\1/2\ SE\1/4\; Section 9 except E\1/2\ 
E\1/2\, SW\1/4\ SW\1/4\; N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\, E\1/2\ 
NW\1/4\ Section 11; NW\1/4\ NW\1/4\ Section 12.
    T.12N., R.01E. Humboldt Meridian: W\1/2\ NW\1/4\, NE\1/4\ NW\1/
4\, S\1/2\ Section 3; Section 4 above MHW; Section 9 above MHW; 
Section 10 except SE\1/4\ NW\1/4\; S\1/2\ NW\1/4\, SW\1/4\ Section 
11; W\1/2\, NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 14; Section 15; 
Section 16 above MHW; Section 21 above MHW; Sections 22-23; SW\1/4\ 
Section 24; Sections 25-27; Section 28 above MHW; Section 33 above 
MHW; Section 34-36.
    T.13N., R.01E. Humboldt Meridian: SW\1/4\, E\1/2\ SE\1/4\ 
Section 33; SW\1/4\ SW\1/4\ Section 34.
[GRAPHIC] [TIFF OMITTED] TR24MY96.079

    Map and description of CA-02-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Orick, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.09N., R.01W. Humboldt Meridian: Section 23 above Mean High 
Water (MHW); Section 26 except SE\1/4\, SE\1/4\ SW\1/4\; Section 27 
above MHW; NE\1/4\ Section 34; NW\1/4\ NW\1/4\ Section 35.
    T.09N., R.01E. Humboldt Meridian: E\1/2\ NW\1/4\, E\1/2\ SW\1/
4\, W\1/2\ SE\1/4\ Section 6; W\1/2\ NE\1/4\, E\1/2\ NW\1/4\, W\1/2\ 
SE\1/4\, SE\1/4\ SE\1/4\ Section 7; E\1/2\ NE\1/4\, NE\1/4\ SE\1/4\ 
Section 18.
    T.10N., R.01E. Humboldt Meridian: SW\1/4\ SE\1/4\, SE\1/4\ SW\1/
4\ Section 8; W\1/2\ Section 17; Section 19 above MHW; E\1/2\ W\1/2\ 
W\1/2\ Section 20; Section 29 except SE\1/4\, SW\1/4\ NE\1/4\, E\1/
2\ SW\1/4\, SW\1/4\ SW\1/4\; Section 30 above MHW; W\1/2\, N\1/2\ 
NE\1/4\, E\1/2\ SW\1/4\, SE\1/4\ NW\1/4\ Section 31.
[GRAPHIC] [TIFF OMITTED] TR24MY96.080

    Map and description of CA-03-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Eureka and Hayfork, California; 1995.
    Critical Habitat includes only Private lands described within the 
following areas:

    T.02N., R.01E. Humboldt Meridian: Section 1-3; N\1/2\ Section 
10; Section 11-12.
    T.02N., R.02E. Humboldt Meridian: Section 3; W\1/2\ Section 4; 
Section 5-6; N\1/2\ Section 7; N\1/2\ Section 8; Section 9-11; 
Section 14; Section 15 except SW\1/4\; N\1/2\ Section 16; N\1/2\ 
Section 22; N\1/2\ Section 23.
    T.03N., R.01E. Humboldt Meridian: S\1/2\ Section 3; Section 4-
10; W\1/2\ Section 11; Section 13-18; W\1/2\ Section 19; Section 20-
26; E\1/2\ Section 27; W\1/2\ Section 28; Section 29-35; Section 36 
except NE\1/4\.
    T.03N., R.02E. Humboldt Meridian: Section 3 except NE\1/4\; 
Section 4; SE\1/4\ Section 5; S\1/2\ Section 6; Section 7; Section 
9; Section 10; W\1/2\ Section 16; Section 18-20; Section 21 except 
NE\1/4\; SW \1/4\ Section 22; W\1/2\ Section 27; Section 28 except 
SW\1/4\; Section 29-30; Section 31 except SW\1/4\; Section 32; 
Section 33 except NW\1/4\.
    T.04N., R.02E. Humboldt Meridian: S\1/2\ S\1/2\ Section 33; 
SW\1/4\ Section 34.

[[Page 26313]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.081

    Map and description of CA-04-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Mendocino and Garberville, 
California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.01N., R.01E. Humboldt Meridian: SW\1/4\ Section 23; S\1/2\ 
Section 24; SW\1/4\ NW\1/4\, N\1/2\ N\1/2\ Section 25; NE\1/4\, E\1/
2\ NW\1/4\ Section 26.
    T.01N., R.02E. Humboldt Meridian: E\1/2\ NE\1/4\, NE\1/4\ SE\1/
4\ Section 11; NW\1/4\ Section 12; S\1/2\ Section 19; W\1/2\ W\1/2\ 
Section 29; N\1/2\, N\1/2\ SE\1/4\, NE\1/4\ SW\1/4\ Section 30; 
NW\1/4\ NW\1/4\, S\1/2\ SE\1/4\, E\1/2\ SW\1/4\ Section 32.
    T.01S., R.01E. Humboldt Meridian: S\1/2\ S\1/2\ Section 13; S\1/
2\ NW\1/4\, S\1/2\ Section 14; E\1/2\ SE\1/4\ Section 15; E\1/2\ 
E\1/2\, SW\1/4\ SE\1/4\ Section 22; Sections 23-27; Section 28 
except W\1/2\ NW\1/4\; Section 33 except SW\1/4\ NW\1/4\, SW\1/4\; 
Sections 34-36.
    T.01S., R.02E. Humboldt Meridian: S\1/2\ NW\1/4\, NW\1/4\ SW\1/
4\, S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 3; Section 4 except 
SW\1/4\ NW\1/4\; NE\1/4\ NE\1/4\ Section 9; NW\1/4\, W\1/2\ NE\1/4\, 
E\1/2\ SE\1/4\ Section 10; SW\1/4\ SW\1/4\ Section 11; W\1/2\ 
Section 14; SE\1/4\, SW\1/4\ SW\1/4\ Section 15; S\1/2\ NW\1/4\, 
SW\1/4\, S\1/2\ SE\1/4\ Section 16; S\1/2\, SE\1/4\ NE\1/4\ Section 
17; S\1/2\ S\1/2\ Section 18; Sections 19-22; W\1/2\ Section 23; 
W\1/2\, SW\1/4\ SE\1/4\ Section 26; Sections 27-34; W\1/2\ NW\1/4\, 
SE\1/4\ NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\, SW\1/4\ NE\1/4\, 
S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ Section 35.
    T.02S., R.01E. Humboldt Meridian: Sections 1-3; E\1/2\ E\1/2\ 
Section 4; E\1/2\ E\1/2\ Section 9; Sections 10-14; Section 15 
except W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\; Section 22 except SW\1/4\, 
W\1/2\ NW\1/4\; Sections 23-25; Section 26 except, SW\1/4\, S\1/2\ 
NW\1/4\, SW\1/4\ NE\1/4\.
    T.02S., R.02E. Humboldt Meridian: SW\1/4\ Section 1; Section 2 
except NE\1/4\, E\1/2\ NW\1/4\, NE\1/4\ SE\1/4\; Sections 3-24; 
Section 25 except SW\1/4\ SW\1/4\; N\1/2\ Section 26; Section 27 
except S\1/2\ S\1/2\; Section 28 except S\1/2\ S\1/2\, NW\1/4\ SW\1/
4\; Section 29 except NE\1/4\ SE\1/4\, S\1/2\ SE\1/4\; Section 30 
except S\1/2\ SW\1/4\; NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\ Section 36.
    T.02S., R.03E. Humboldt Meridian: Section 7 except N\1/2\; SW\1/
4\ SW\1/4\ Section 8; Section 17 except NE\1/4\, E\1/2\ SE\1/4\; 
Sections 18-20; Section 21 except NW\1/4\ NE\1/4\, SE\1/4\ NE\1/4\, 
N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\; S\1/2\ S\1/2\, NW\1/4\ SW\1/4\, 
SW\1/4\ NW\1/4\ Section 27; Section 28 except NE\1/4\ NE\1/4\; 
Section 29 except W\1/2\ NW\1/4\; Section 30 except SE\1/4\ NE\1/4\, 
NE\1/4\ SE\1/4\; Section 31 except S\1/2\ S\1/2\, NW\1/4\ SE\1/4\; 
Section 32 except SE\1/4\ NE\1/4\, S\1/2\; N\1/2\ NE\1/4\, NE\1/4\ 
NW\1/4\ Section 33; E\1/2\, NW\1/4\ Section 34; SE\1/4\ NW\1/4\, 
NW\1/4\ NW\1/4\ Section 35.
    T.03S., R.03E. Humboldt Meridian: NW\1/4\ Section 3; E\1/2\ 
NE\1/4\ Section 11; N\1/2\, NW\1/4\ SW\1/4\, SE\1/4\ Section 12; 
SE\1/4\ SE\1/4\, Section 13.
    T.03S., R.04E. Humboldt Meridian: SW\1/4\ SW\1/4\ Section 18; 
NW\1/4\, NW\1/4\ SW\1/4\ Section 30.
[GRAPHIC] [TIFF OMITTED] TR24MY96.082

    Map and description of CA-04-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Garberville, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.04S., R.03E. Humboldt Meridian: SE\1/4\ SW\1/4\, S\1/2\ SE\1/
4\ Section 2; S\1/2\ SE\1/4\ Section 9; SW\1/4\, NW\1/4\ SE\1/4\ 
Section 10; E\1/2\ NW\1/4\, SW\1/4\ NE\1/4\, N\1/2\ NE\1/4\ Section 
11.
[GRAPHIC] [TIFF OMITTED] TR24MY96.083

    Map and description of CA-05-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Cape Mendocino, Garberville and Covelo, 
California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.02S., R.02E. Humboldt Meridian: SE\1/4\ SE\1/4\ Section 31; 
S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 32.
    T.03S., R.02W. Humboldt Meridian: SE\1/4\ NW\1/4\, E\1/2\ SW\1/
4\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ Section 12; Sections 13-14; 
Section 15-16 East of Mean High Water (MHW); Section 22-23 East of 
MHW; Section 24 except SE\1/4\; N\1/2\ NE\1/4\ Section 26 East of 
MHW.
    T.03S., R.01W. Humboldt Meridian: SW\1/4\ SW\1/4\ Section 9; 
NE\1/4\ SE\1/4\ Section 10; S\1/2\, SE\1/4\ NE\1/4\ Section 11; 
SW\1/4\ NW\1/4\, S\1/2\ Section 12; Sections 13-18; N\1/2\ NW\1/4\, 
SW\1/4\ NW\1/4\ Section 19; N\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, NE\1/
4\, N\1/2\ SE\1/4\, Section 20; Sections 21-26; N\1/2\, E\1/2\ SE\1/
4\ Section 27; N\1/2\ NE\1/4\ Section 28; NE\1/4\ NW\1/4\, NW\1/4\ 
NE\1/4\ Section 35; N\1/2\ NW\1/4\, NE\1/4\, E\1/2\ SW\1/4\ Section 
36.
    T.03S., R.01E. Humboldt Meridian: N\1/2\ SE\1/4\, SE\1/4\ SE\1/
4\, NE\1/4\ SW\1/4\ Section 12; N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\, 
SE\1/4\ NE\1/4\ Section 13; SW\1/4\ NW\1/4\, W\1/2\ SW\1/4\ Section 
18; W\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 19; SE\1/4\ 
NE\1/4\, NE\1/4\ SE\1/4\ Section 24; W\1/2\ SW\1/4\ Section 29; 
Section 30 except NE\1/4\ NE\1/4\; Section 31; W\1/2\ W\1/2\, NE\1/
4\ NW\1/4\, NE\1/4\ SW\1/4\ Section 32.
    T.03S., R.02E. Humboldt Meridian: W\1/2\ SW\1/4\, NW\1/4\, SE\1/
4\ NE\1/4\, SW\1/4\ SE\1/4\ Section 5; E\1/2\ SE\1/4\, SW\1/4\ SE\1/
4\ Section 6; Section 7 except SW\1/4\ NW\1/4\, SE\1/4\ SE\1/4\; 
W\1/2\ W\1/2\, SE\1/4\ NW\1/4\, SW\1/4\, W\1/2\ NE\1/4\, W\1/2\ 
SE\1/4\, SE\1/4\ SE\1/4\ Section 8; S\1/2\ SW\1/4\ Section 9; E\1/2\ 
SW\1/4\ Section 18; NE\1/4\ NW\1/4\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/
4\ Section 19; SE\1/4\ NE\1/4\ Section 20; NW\1/4\ NE\1/4\ Section 
22; NW\1/4\ NW\1/4\ Section 28; NW\1/4\ NE\1/4\ Section 30.
    T.04S., R.01W. Humboldt Meridian: S\1/2\ S\1/2\, Section 1; 
SE\1/4\ SE\1/4\ Section 2; SE\1/4\ SE\1/4\ Section 10; S\1/2\, NE\1/
4\ Section 11; N\1/2\, W\1/2\ SW\1/4\ Section 12; Section 14 east of 
MHW.
    T.04S., R.01E. Humboldt Meridian: SW\1/4\, W\1/2\ SE\1/4\, SE\1/
4\ SE\1/4\, S\1/2\ NE\1/4\ Section 4; Section 5; Section 6 except 
S\1/2\ SW\1/4\; NE\1/4\, E\1/2\ NW\1/4\, NE\1/4\ SE\1/4\ Section 7; 
N\1/2\ Section 8; Section 9 except N\1/2\ NW\1/4\, NE\1/4\ NE\1/4\; 
S\1/2\, E\1/2\ NE\1/4\ Section 10; SW\1/4\, SW\1/4\ NW\1/4\ Section 
11; Section 15; Section 16 except SW\1/4\ SW\1/4\; S\1/2\ SW\1/4\ 
Section 20; E\1/2\, S\1/2\ SW\1/4\ Section 21; Sections 22-23; S\1/
2\ NW\1/4\, NW\1/4\ NW\1/4\, SW\1/4\ Section 24; W\1/2\ Section 25; 
Section 26-27; Section 28 except NW\1/4\ NW\1/4\; N\1/2\, SE\1/4\ 
SE\1/4\ Section 29; N\1/2\ N\1/2\ Section 33; E\1/2\ Section 34; 
Section 35; W\1/2\ Section 36.
    T.04S., R.02E. Humboldt Meridian: S\1/2\ SW\1/4\, NE\1/4\ SW\1/
4\, NW\1/4\ SE\1/4\ Section 31.
    T.05S., R.01E. Humboldt Meridian: Section 1; Section 2 except 
N\1/2\ SW\1/4\; E\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 3; NE\1/4\, 
S\1/2\ SE\1/4\, NE\1/4\ NW\1/4\ Section 11; Section 12 except N\1/2\ 
NW\1/4\, NE\1/4\ SW\1/4\; Section 13 except W\1/2\ NE\1/4\, SE\1/4\ 
NE\1/4\, NE\1/4\ SE\1/4\; E\1/2\ Section 14; Section 23 East of MHW; 
Section 24; Section 25 East of MHW.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.05S., R.02E. Humboldt Meridian: Western \1/2\ of the Western 
\1/2\ of the Township T.05S., R.02E.

[[Page 26314]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.084

    Map and description of CA-05-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Covelo, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.24N., R.19W. Mt. Diablo Meridian: W\1/2\ W\1/2\ Section 2; 
Section 3 except E\1/2\ NW\1/4\; Section 4 except NE\1/4\ NE\1/4\; 
Section 5; Section 9 above MHW; Section 10; W\1/2\ W\1/2\, SE\1/4\ 
SW\1/4\ Section 11; W\1/2\ Section 14; Section 15 above MHW; Section 
22 above MHW; Section 23 except NE\1/4\, NE\1/4\ SE\1/4\; Section 24 
except NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\; Section 25 except SW\1/4\ 
SW\1/4\; Section 26 above MHW; Section 36 above MHW.
    T.24N., R.18W. Mt. Diablo Meridian: SW\1/4\ NW\1/4\, SE\1/4\ 
SW\1/4\, W\1/2\ SW\1/4\ Section 31.
    T.23N., R.19W. Mt. Diablo Meridian: Section 1 above MHW.
    T.23N., R.18W. Mt. Diablo Meridian: Section 5; Section 6 except 
E\1/2\ NE\1/4\ ; Section 7 above MHW; Section 8 except N\1/2\ NE\1/
4\, SE\1/4\ NE\1/4\, NE\1/4\ SE\1/4\; W\1/2\ SW\1/4\, S\1/2\ SE\1/4\ 
Section 15; Section 16 except NE\1/4\ NW\1/4\, NE\1/4\, Section 21 
above MHW; N\1/2\ Section 22.
    T.05S., R.02E. Humboldt Meridian: NW\1/4\ NW\1/4\, SE\1/4\ NW\1/
4\ Section 22; NE\1/4\ Section 27.
[GRAPHIC] [TIFF OMITTED] TR24MY96.085

    Map and description of CA-06-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Garberville and Covelo, California; 
1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.05S., R.03E. Humboldt Meridian: SE\1/4\ SE\1/4\ Section 10; 
SW\1/4\ SW\1/4\ Section 11; Section 13 except NE\1/4\; Section 14 
except NW\1/4\ NE\1/4\; Section 15 except SW\1/4\; NW\1/4\ NE\1/4\, 
NE\1/4\ NW\1/4\ Section 24.

    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.24N., R.15W. Mt. Diablo Meridian: SW\1/4\ NW\1/4\, W\1/2\ 
SE\1/4\, SW\1/4\ Section 4; Section 5 except W\1/2\ SW\1/4\; S\1/2\ 
NE\1/4\ Section 6.
    T.24N., R.16W. Mt. Diablo Meridian: N\1/2\ NE\1/4\, NE\1/4\ 
NW\1/4\ Section 3; W\1/2\ NW\1/4\, NW\1/4\ SE\1/4\, NE\1/4\ NW\1/4\, 
S\1/2\ SE\1/4\, Section 5; SE\1/4\ NE\1/4\, N\1/2\ NW\1/4\, Section 
6; W\1/2\ SE\1/4\ Section 7; SE\1/4\ SW\1/4\, W\1/2\ SE\1/4\, SE\1/
4\ SE\1/4\ Section 9; S\1/2\ SW\1/4\ Section 10.
    T.24N., R.17W. Mt. Diablo Meridian: Section 1 except S\1/2\ 
NE\1/4\, NW\1/4\ NW\1/4\, SE\1/4\ SE\1/4\; Section 2 except SE\1/4\ 
SW\1/4\; S\1/2\ S\1/2\, NE\1/4\ SE\1/4\, S\1/2\ N\1/2\, NE\1/4\ 
NE\1/4\ Section 3; SE\1/4\ SE\1/4\, NW\1/4\ SE\1/4\ Section 4; W\1/
2\ NW\1/4\ Section 10; NW\1/4\ NE\1/4\, W\1/2\ NW\1/4\ Section 11.
    T.05S., R.05E. Humboldt Meridian: N\1/2\ NW\1/4\ Section 2; N\1/
2\ N\1/2\, SW\1/4\ NW\1/4\ Section 3; E\1/2\ NE\1/4\ Section 4; 
SE\1/4\ SE\1/4\ Section 7; SW\1/4\ SW\1/4\ Section 8; SW\1/4\ NW\1/
4\, N\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, NE\1/4\ SE\1/4\, Section 15; 
NW\1/4\ SW\1/4\ Section 17; E\1/2\ E\1/2\ Section 18; NE\1/4\ NE\1/
4\, SE\1/4\ SE\1/4\ Section 19; NW\1/4\ SW\1/4\ Section 20; W\1/2\ 
NE\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\, N\1/2\ SE\1/4\, SW\1/4\ 
SE\1/4\ Section 22; NW\1/4\ SW\1/4\ Section 23; S\1/2\ NW\1/4\, N\1/
2\ SW\1/4\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ Section 25; NE\1/4\ 
NW\1/4\, NE\1/4\ SW\1/4\, W\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 
26; W\1/2\ W\1/2\, NE\1/4\ SW\1/4\ Section 28; S\1/2\ N\1/2\, E\1/2\ 
SW\1/4\, N\1/2\ SE\1/4\ Section 29; NE\1/4\, NE\1/4\ NW\1/4\ Section 
32; NW\1/4\ NE\1/4\, S\1/2\ NE\1/4\, NW\1/4\, NE\1/4\ SW\1/4\, SE\1/
4\ Section 33; SW\1/4\ NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ 
Section 34; NE\1/4\ NE\1/4\ Section 36.
    T.05S., R.06E. Humboldt Meridian: S\1/2\ NW\1/4\, SW\1/4\ 
Section 30; Section 31 except NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\, SE\1/
4\ NE\1/4\.
    T.04S., R.05E. Humboldt Meridian: SE\1/4\ SW\1/4\ Section 15; 
NW\1/4\, W\1/2\ NE\1/4\, NE\1/4\ SW\1/4\ Section 22; SE\1/4\ Section 
33; W\1/2\ W\1/2\, SE\1/4\ SW\1/4\ Section 34.
[GRAPHIC] [TIFF OMITTED] TR24MY96.086

    Map and description of CA-06-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Covelo, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.21N., R.15W. Mt. Diablo Meridian: W\1/2\ NW\1/4\ Section 5; 
Sections 6-7; NW\1/4\ NE\1/4\, N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\, N\1/
2\ S\1/2\, SW\1/4\ SW\1/4\ Section 8; W\1/2\ W\1/2\, SE\1/4\ SW\1/
4\, S\1/2\ SE\1/4\ Section 17; Section 18.
    T.21N., R.16W. Mt. Diablo Meridian: Section 1; N\1/2\ NE\1/4\, 
NE\1/4\ NW\1/4\, SE\1/4\ SE\1/4\ Section 2; E\1/2\ NE\1/4\ Section 
11; Section 12 except NW\1/4\ SW\1/4\ and S\1/2\ SW\1/4\; NE\1/4\, 
NE\1/4\ SE\1/4\ Section 13.
    T.22N., R.14W. Mt. Diablo Meridian: NW\1/4\ SW\1/4\, S\1/2\ 
SW\1/4\ Section 6; Section 7; Section 18 except E\1/2\ SE\1/4\; ; 
SE\1/4\ SE\1/4\ Section 20; SW\1/4\ SW\1/4\, NE\1/4\ SE\1/4\ Section 
21; E\1/2\ NE\1/4\, W\1/2\ NW\1/4\, NE\1/4\ SE\1/4\ Section 28; 
NE\1/4\, NE\1/4\ NW\1/4\, S\1/2\ NW\1/4\, SW\1/4\, NW\1/4\ SE\1/4\ 
Section 29; S\1/2\ NE\1/4\, N\1/2\ NW\1/4\, N\1/2\ SE\1/4\ Section 
32.
    T.22N., R.15W. Mt. Diablo Meridian: SW\1/4\ NE\1/4\, S\1/2\ 
Section 1; N\1/2\ Section 12; E\1/2\ Section 13; NE\1/4\ SW\1/4\, 
S\1/2\ SW\1/4\, W\1/2\ SE\1/4\ Section 19; NW\1/4\ NE\1/4\ Section 
24; SW\1/4\ NE\1/4\, W\1/2\ NW\1/4\, SW\1/4\, W\1/2\ SE\1/4\ Section 
30; SW\1/4\ NE\1/4\, NW\1/4\ NW\1/4\, S\1/2\ NW\1/4\, S\1/2\ Section 
31.
    T.22N., R.16W. Mt. Diablo Meridian: SW\1/4\, SW\1/4\ NW\1/4\, 
W\1/2\ W\1/2\ Section 3; Section 4; Section 5 except S\1/2\ SE\1/4\, 
NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; E\1/2\, E\1/2\ W\1/2\, S\1/2\ 
SW\1/4\, NE\1/4\ NW\1/4\ Section 6; E\1/2\ NE\1/4\, N\1/2\ NW\1/4\, 
SE\1/4\ SW\1/4\, SE\1/4\ Section 7; N\1/2\ NE\1/4\, E\1/2\ W\1/2\, 
S\1/2\ SE\1/4\, SW\1/4\ SW\1/4\ Section 8; Section 9 except N\1/2\ 
NW\1/4\ and SE\1/4\ NW\1/4\; SW\1/4\ NE\1/4\, W\1/2\, NW\1/4\ SE\1/
4\, S\1/2\ SE\1/4\ Section 10; W\1/2\ Section 17; Section 18 except 
N\1/2\ NW\1/4\, W\1/2\ SW\1/4\; S\1/2\ NE\1/4\, NW\1/4\ NE\1/4\ 
Section 19; NW\1/4\ SW\1/4\ Section 20; SE\1/4\ SE\1/4\ Section 21; 
S\1/2\ SW\1/4\, SW\1/4\ SE\1/4\ Section 22; SE\1/4\ SE\1/4\ Section 
23; Section 26; Section 27 except NE\1/4\ NE\1/4\, W\1/2\ SW\1/4\, 
S\1/2\ SE\1/4\, SE\1/4\ SW\1/4\; SE\1/4\ Section 34; Section 35.
    T.22N., R.17W. Mt. Diablo Meridian: NE\1/4\ NE\1/4\, SW\1/4\ 
NE\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ SW\1/4\, W\1/2\ SE\1/4\ Section 
12; S\1/2\ SE\1/4\ Section 13; N\1/2\ NE\1/4\ Section 24.
    T.23N., R.16W. Mt. Diablo Meridian: W\1/2\ NW\1/4\ Section 3; 
NE\1/4\ NE\1/4\ Section 4; SE\1/4\ SW\1/4\, E\1/2\ NE\1/4\, NW\1/4\ 
SE\1/4\ Section 5; W\1/2\ W\1/2\ Section 6; Section 7 except NW\1/
4\; NE\1/4\ NW\1/4\, SW\1/4\ NW\1/4\, SW\1/4\ SW\1/4\ Section 8; 
W\1/2\ Section 17; Section 18 except, N\1/2\ NW\1/4\, SW\1/4\ NW\1/
4\, W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\; S\1/2\ SE\1/4\, S\1/2\ SW\1/4\, 
NE\1/4\ SE\1/4\ Section 19; S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, N\1/2\ 
SE\1/4\, SE\1/4\ SE\1/4\ Section 20; NW\1/4\ NW\1/4\, S\1/2\ NW\1/
4\, SW\1/4\, SW\1/4\ SE\1/4\ Section 28; Section 29; Section 30 
except NW\1/4\ NW\1/4\; Section 31 except SW\1/4\ SW\1/4\; Section 
32 except SE\1/4\ NE\1/4\, SW\1/4\ SE\1/4\, E\1/2\ SE\1/4\; Section 
33 except NE\1/4\ NE\1/4\, S\1/2\ NW\1/4\; S\1/2\ NW\1/4\, N\1/2\ 
SW\1/4\ Section 34.
    T.23N., R.17W. Mt. Diablo Meridian: Section 1 except S\1/2\ 
SW\1/4\; NE\1/4\ SE\1/4\ Section 2.
    T.24N., R.16W. Mt. Diablo Meridian: SE\1/4\ NE\1/4\, SE\1/4\ 
NW\1/4\, NW\1/4\ SW\1/4\, SE\1/4\ SW\1/4\,

[[Page 26315]]

NE\1/4\ SE\1/4\ Section 17; W\1/2\ SE\1/4\, E\1/2\ SW\1/4\ Section 
18; Section 19 except SW\1/4\ SE\1/4\; W\1/2\ NE\1/4\, E\1/2\ NW\1/
4\ Section 20; S\1/2\ NW\1/4\, SW\1/4\ Section 27; Section 28 except 
N\1/2\ N\1/2\ and SE\1/4\ SW\1/4\; Section 29 except N\1/2\ NE\1/4\, 
NW\1/4\ NW\1/4\; Section 30 except N\1/2\ NE\1/4\; Section 31; 
Section 32 except SE\1/4\ NE\1/4\ and E\1/2\ SE\1/4\; N\1/2\ NE\1/
4\, NW\1/4\ NW\1/4\ Section 33; NW\1/4\ Section 34.
    T.24N., R.17W. Mt. Diablo Meridian: NE\1/4\ NE\1/4\ Section 23; 
Section 24 except NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\; E\1/2\, E\1/2\ 
NW\1/4\, NW\1/4\ NW\1/4\, SW\1/4\ SW\1/4\ Section 25, N\1/2\ SE \1/
4\ Section 26, Section 36.

    Critical Habitat includes only State lands described within the 
following areas:

    T.21N., R.16W. Mt. Diablo Meridian: SW\1/4\ NE\1/4\, S\1/2\ 
NW\1/4\ Section 26.
    T.23N., R.17W. Mt. Diablo Meridian: N\1/2\ SW\1/4\, S\1/2\ NW\1/
4\ Section 2; Section 3 except NE\1/4\, S\1/2\ SE\1/4\; E\1/2\ NW\1/
4\, SW\1/4\ NW\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ Section 4.
    T.24N., R.17W. Mt. Diablo Meridian: Section 28 except SW\1/4\ 
SW\1/4\; NW\1/4\ Section 27; W\1/2\ Section 33; SE\1/4\ SW\1/4\ 
Section 34.
[GRAPHIC] [TIFF OMITTED] TR24MY96.087

    Map and description of CA-07-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Ukiah, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.17N., R.14W. Mt. Diablo Meridian: W\1/2\ SW\1/4\, NE\1/4\ 
SW\1/4\ Section 6; W\1/2\ NW\1/4\, NW\1/4\ SW\1/4\ Section 7.
    T.17N., R.15W. Mt. Diablo Meridian: W\1/2\, SE\1/4\ Section 2; 
Sections 3-8; Section 9 except SE\1/4\ SE\1/4\ ; Section 10 except 
S\1/2\ S\1/2\; Section 11; Section 12 except SW\1/4\ SE\1/4\; N\1/2\ 
NE\1/4\ Section 14; Section 18 except SE\1/4\, W\1/2\ SW\1/4\.
    T.17N., R.16W. Mt. Diablo Meridian: N\1/2\ N\1/2\ Section 1; 
Section 3 except W\1/2\ W\1/2\; Sections 4-6; NE\1/4\, SW\1/4\ 
Section 7; N\1/2\, N\1/2\ SW\1/4\ Section 8; N\1/2\, N\1/2\ SE\1/4\, 
SE\1/4\ SE\1/4\ Section 9; Section 10 except NE\1/4\ NE\1/4\; 
Section 18 except SE\1/4\ SE\1/4\; NW\1/4\, W\1/2\ SW\1/4\ Section 
19; W\1/2\ NW\1/4\ Section 30.
    T.17N., R.17W. Mt. Diablo Meridian: Sections 1-3; NE\1/4\, SW\1/
4\ NW\1/4\, S\1/2\ Section 4; NE\1/4\, N\1/2\ NW\1/4\, SE\1/4\ NW\1/
4\, NE\1/4\ SE\1/4\, S\1/2\ S\1/2\ Section 5; N\1/2\ NE\1/4\ Section 
6; Section 8 except W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\, SW\1/4\ SE\1/
4\; Sections 9-15; SE\1/4\ NE\1/4\, N\1/2\ NE\1/4\, NE\1/4\ NW\1/4\, 
S\1/2\ Section 16; S\1/2\ Section 17; S\1/2\, S\1/2\ NE\1/4\ Section 
18; NW\1/4\ Section 19; N\1/2\ NE\1/4\ Section 20; Section 21 except 
SE\1/4\ SW\1/4\; Section 22 except E\1/2\ SW\1/4\ ; Section 23 
except NW\1/4\ SW\1/4\; Section 24; NE\1/4\ NW\1/4\, NW\1/4\ SW\1/4\ 
Section 26; Section 27 except SW\1/4\ NW\1/4\, SE\1/4\ SE\1/4\, N\1/
2\ NE\1/4\; Section 28 except NE\1/4\ NE\1/4\, SW\1/4\, S\1/2\ SE\1/
4\, W\1/2\ NW\1/4\.
    T.17N., R.18W. Mt. Diablo Meridian: SE\1/4\ SE\1/4\ Section 13.
    T.18N., R.15W. Mt. Diablo Meridian: SW\1/4\ Section 18; Section 
19; SE\1/4\ NE\1/4\, NE\1/4\ SW\1/4\, S\1/2\ SW\1/4\, SE\1/4\ 
Section 20; Section 21; Section 22 except NE\1/4\; Section 23 except 
N\1/2\ NW\1/4\; W\1/2\ W\1/2\, SE\1/4\ SW\1/4\ Section 24; W\1/2\ 
Section 25; Section 26 except E\1/2\ E\1/2\; Sections 27-34; Section 
35 except NE\1/4\ SE\1/4\.
    T.18N., R.16W. Mt. Diablo Meridian: S\1/2\ Section 13; SE\1/4\ 
Section 14; SW\1/4\, W\1/2\ SE\1/4\ Section 15; S\1/2\ N\1/2\, NW\1/
4\ NW\1/4\, S\1/2\ Section 16; Section 17 except NW\1/4\ NW\1/4\; 
S\1/2\ Section 18; Sections 19-33; Section 34 except E\1/2\ SE\1/4\; 
Section 35 except W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\; Section 36.
    T.18N., R.17W. Mt. Diablo Meridian: Section 20 except N\1/2\ 
N\1/2\, SW\1/4\ SW\1/4\; Section 21 except NW\1/4\ NE\1/4\, N\1/2\ 
NW\1/4\; NE\1/4\, NE\1/4\ SE\1/4\, SW\1/4\ SE\1/4\ Section 23; 
Section 24; Section 25 except S\1/2\ S\1/2\, N\1/2\ SE\1/4\ ; 
Section 26 except NW\1/4\ NW\1/4\; Section 27; NE\1/4\ NE\1/4\ 
Section 28; N\1/2\ NW\1/4\, SW\1/4\ NW\1/4\ Section 29; NW\1/4\ 
SW\1/4\, NE\1/4\ SE\1/4\, S\1/2\ S\1/2\ Section 31; S\1/2\ NE\1/4\, 
S\1/2\ Section 32; S\1/2\ N\1/2\, N\1/2\ S\1/2\, SE\1/4\ SE\1/4\ 
Section 33; Sections 34-36.
    T.18N., R.18W. Mt. Diablo Meridian: SW\1/4\ Section 25; W\1/2\, 
SE\1/4\ Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.088

    Map and description of CA-07-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Ukiah, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.14N., R.15W. Mt. Diablo Meridian: E\1/2\ SW\1/4\, SW\1/4\ 
SE\1/4\, SE\1/4\ NW\1/4\ Section 11; Section 13 except E\1/2\ E\1/
2\, NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\; E\1/2\ E\1/2\, NE\1/4\, NW\1/
4\, NW\1/4\ NE\1/4\ Section 14; NE\1/4\, NE\1/4\ NW\1/4\, N\1/2\ 
SE\1/4\ Section 24.
[GRAPHIC] [TIFF OMITTED] TR24MY96.089

    Map and description of CA-07-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Point Arena, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.12N., R.13W. Mt. Diablo Meridian: S\1/2\ NW\1/4\, SW\1/4\, 
N\1/2\ SE\1/4\, SW\1/4\ SE\1/4\, S\1/2\ NE\1/4\ Section 8.
[GRAPHIC] [TIFF OMITTED] TR24MY96.090

    Map and description of CA-07-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Ukiah, California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.16N., R.14W. Mt. Diablo Meridian: S\1/2\ S\1/2\ Section 14; 
E\1/2\ SE\1/4\, SE\1/4\ NE\1/4\ Section 15; E\1/2\ Section 22; 
Section 23 except E\1/2\ NE\1/4\; W\1/2\ NW\1/4\, SE\1/4\ NW\1/4\, 
NE\1/4\ SW\1/4\ Section 25; E\1/2\ NE\1/4\ Section 26.

[[Page 26316]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.091

    Map and description of CA-08-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Point Arena, California; 1995.
    Critical Habitat includes only State lands described within areas 
bounded by the following descriptions:
    (a) starting at Station H-34 on the easterly line of the German 
Rancho, South 33 deg. 50' West for 3,200 feet, South 86 deg. 20' West 
for 1,927 feet, North 53 deg. West for 1,372 feet, North 37 deg. West 
for 1,550.5 feet, North 48 deg. East for 1,720 feet, South 86 deg. 45' 
East for 2,203.5 feet, North 55 deg. East for 1,110.1 feet, South 
8 deg. 50' East for 653 feet; and (b) starting at the westernmost point 
of Kruse Rhododendron State Reserve proceeding North 48 deg. East along 
the Kruse Rhododendron State Reserve boundary to the intersection with 
Kruse Ranch Road, west on Kruse Ranch Road to the intersection with 
State Highway 1, north on State Highway 1 to Cannon Gulch, northeast 
along Cannon Gulch to the Rancho de German Spanish Land Grant boundary, 
northwest along the Rancho de German Spanish Land Grant boundary to the 
western edge of Range 13 West, South 29 deg. 30'' from this point to 
Mean High Water (MHW), southwest along the shoreline at MHW to the 
south boundary of the Rancho de German Spanish Land Grant, east along 
the Spanish Land Grant boundary to the southeast corner of the land 
grant, north on the eastern boundary of the land grant to the eastern 
corner of the Kruse Rhododendron State Reserve, south along the Kruse 
Rhododendron State Reserve boundary to the westernmost point of the 
reserve.
    Critical Habitat includes only State lands described within the 
following areas:

    T.09N., R.13W. Mt. Diablo Meridian: SW\1/4\, SW\1/4\ NW\1/4\, 
SW\1/4\ SE\1/4\ Section 18; NW\1/4\ Section 19.
[GRAPHIC] [TIFF OMITTED] TR24MY96.092

    Map and description of CA-08-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Point Arena and Healdsburg, California; 
1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.08N., R.10W. Mt. Diablo Meridian: NW\1/4\, S\1/2\ SW\1/4\ 
Section 5; Section 6 except N\1/2\ SE\1/4\; Section 7 except W\1/2\ 
W\1/2\; W\1/2\ W\1/2\ Section 8; W\1/2\ W\1/2\ Section 17; Section 
18 except W\1/2\ SW\1/4\.
    T.08N., R.11W. Mt. Diablo Meridian: Section 1 except N\1/2\ 
NE\1/4\; Section 2 except SW\1/4\ SE\1/4\; Section 3 except S\1/2\ 
NW\1/4\, SW\1/4\ NE\1/4\; NE\1/4\, N\1/2\ SE\1/4\, E\1/2\ NW\1/4\, 
NE\1/4\ SW\1/4\ Section 10; NW\1/4\, N\1/2\ SW\1/4\ Section 11; N\1/
2\ NE\1/4\, SW\1/4\ NE\1/4\ Section 13; NW\1/4\ NW\1/4\ Section 15.
    T.09N., R.11W. Mt. Diablo Meridian: SW\1/4\ SW\1/4\ Section 27; 
SE\1/4\ SE\1/4\ Section 28; E\1/2\ E\1/2\ Section 33; Section 34; 
SW\1/4\, S\1/2\ SE\1/4\ Section 35.
    T.09N., R.10W. Mt. Diablo Meridian: SW\1/4\, S\1/2\ SE\1/4\ 
Section 31; SW\1/4\ Section 32.
[GRAPHIC] [TIFF OMITTED] TR24MY96.093

    Map and description of CA-09-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Napa, California; 1995.
    Critical Habitat includes only State lands bounded by the following 
descriptions:
    (a) on the west by Point Reyes National Seashore, on the east by 
the shoreline of Tomales Bay at Mean High Water (MHW), on the south by 
a line beginning at the intersection of Pierce Point Road with Sir 
Francis Drake Highway proceeding North 75 deg. 07'03'' East for 
4,734.31 feet to the shoreline of Tomales Bay at MHW; (b) on the east 
and north by Sir Francis Highway, on the west by Point Reyes National 
Seashore, on the south by the southern boundary of the Punta De Los 
Reyes (Randall) Spanish Land Grant; (c) State lands within the Nicasio 
(Halleck) Spanish Land Grant west of State Highway 1 and east of the 
shoreline of Tomales Bay at MHW; and (d) State lands within the Nicasio 
(Frink and Reynolds) Spanish Land Grant.
[GRAPHIC] [TIFF OMITTED] TR24MY96.094

    Map and description of CA-09-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Napa and San Francisco, California; 
1995.
    Critical Habitat includes only State lands bounded by the following 
descriptions: (a) portions of Ranchos Nicasio, San Geronimo, and 
Tomales Y Baulines Spanish Land Grants bounded on the north, west, and 
south by Golden Gate National Recreation Area and on the east by a line 
122 deg. 41'33'' West; and (b) portions of Ranchos Tomales Y Bolinas, 
Las Baulines, and Sausalito Spanish Land Grants bounded by a line 
starting at the intersection of the Rancho Las Baulines Spanish Land 
Grant boundary line with McKinnan Gulch, west along McKinnan Gulch to 
the Pacific Ocean, south east along the Pacific Ocean at Mean High 
Water (MHW) to the intersection with Cold Stream, east along Cold 
Stream to the intersection with State Highway 1, south on State Highway 
1 to the intersection with the south end of the Panoramic Highway, 
following the Panoramic Highway to the intersection with Rattlesnake 
Creek, north along Rattlesnake Creek to the intersection with the 
Rancho Sausalito Spanish Land Grant line, southwest along the Spanish 
Land Grant boundary to the intersection

[[Page 26317]]

with the Rancho Las Baulines Spanish Land Grant line, north along the 
Rancho Las Baulines Spanish Land Grant boundary to the intersection 
with McKinnan Gulch.
[GRAPHIC] [TIFF OMITTED] TR24MY96.095

    Map and description of CA-10-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Grants Pass, Oregon; Happy Camp, 
California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.17N., R.07E. Humboldt Meridian: Section 1; Section 2 except 
NW\1/4\ SW\1/4\, S\1/2\ SW\1/4\; N\1/2\ Section 3; NE\1/4\ NE\1/4\ 
Section 4; NE\1/4\ SW\1/4\, E\1/2\ Section 11; N\1/2\ N\1/2\, SW\1/
4\ NW\1/4\, W\1/2\ SW\1/4\ Section 12; NW\1/4\, NW\1/4\ SW\1/4\ 
Section 13; NE\1/4\, N\1/2\ SE\1/4\ Section 14.
    T.17N., R.08E. Humboldt Meridian: Section 6 except E\1/2\ E\1/
2\, SW\1/4\ SE\1/4\.
    T.18N., R.07E. Humboldt Meridian: Section 30 except NW\1/4\; 
NE\1/4\, N\1/2\ NW\1/4\, Section 31; N\1/2\, NW\1/4\ SW\1/4\ Section 
32; Section 36.
    T.18N., R.08E. Humboldt Meridian: Section 31 except SE\1/4\ 
SE\1/4\.
    T.41S., R.06W. Willamette Meridian: Section 4 except N\1/2\ 
NE\1/4\; Section 5 except N\1/2\ NW\1/4\, NW\1/4\ NE\1/4\; SE\1/4\, 
S\1/2\ SW\1/4\ Section 6; Sections 7-8; Section 9 except N\1/2\ 
SW\1/4\, SE\1/4\ SE\1/4\; NW\1/4\ SW\1/4\, W\1/2\ NW\1/4\ Section 
10; S\1/2\, NW\1/4\ Section 16; Sections 17-18.
    T.41S., R.07W. Willamette Meridian: Section 10 except W\1/2\ 
NW\1/4\, NE\1/4\ NE\1/4\, NW\1/4\ SW\1/4\; Section 11 except NW\1/
4\; Section 12 except NE\1/4\ NW\1/4\, W\1/2\ NE\1/4\; Sections 13-
15.
Description of lands using protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.18N., R.07E. Humboldt Meridian: Section 1-4; E\1/2\ Section 5; 
NE\1/4\, E\1/2\ SE\1/4\ Section 8; Sections 9-16; E\1/2\ Section 17; 
SE\1/4\ SE\1/4\ Section 19; E\1/2\, S\1/2\ SW\1/4\ Section 20; 
Sections 21-29; E\1/2\, N\1/2\ NW\1/4\ Section 33; Sections 34-35.
    T.18N., R.08E. Humboldt Meridian: SW\1/4\, W\1/2\ NW\1/4\, S\1/
2\ SE\1/4\ Section 6; Section 7; Section 8 except N\1/2\ NE\1/4\, 
N\1/2\ NW\1/4\; W\1/2\ SW\1/4\ Section 9; W\1/2\, S\1/2\ SE\1/4\ 
Section 16; Sections 17-21; Section 28; Section 29 except SW\1/4\ 
SE\1/4\; Section 30; NW\1/4\ NW\1/4\ Section 32; N\1/2\ NW\1/4\, 
E\1/2\ Section 33.
    T.19N., R.07E. Humboldt Meridian: E\1/2\ Section 32; Sections 
33-36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.096

    Map and description of CA-11-a taken from United States Fish and 
Wildlife Service 1:100,000 map; Hoopa and Hayfork, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.07N., R.03E. Humboldt Meridian: E\1/2\ SE\1/4\, W\1/2\ SW\1/
4\, SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\ Section 1; E\1/2\ NE\1/4\, N\1/
2\ NW\1/4\, SE\1/4\ Section 2; N\1/2\ NE\1/4\, SW\1/4\ NE\1/4\ 
Section 3; SW\1/4\ SE\1/4\ Section 4; SE\1/4\ NE\1/4\ Section 5; 
NE\1/4\ NE\1/4\ Section 8; W\1/2\ NW\1/4\, NE\1/4\ NW\1/4\, NW\1/4\ 
NE\1/4\, SE\1/4\ NE\1/4\ Section 9; SE\1/4\ NW\1/4\ Section 10; E\1/
2\ E\1/2\, NW\1/4\ NE\1/4\, SW\1/4\ SE\1/4\ Section 11; W\1/2\ W\1/
2\, E\1/2\ E\1/2\, SW\1/4\ SE\1/4\ Section 12; W\1/2\ SW\1/4\ 
Section 13; E\1/2\ W\1/2\, W\1/2\ E\1/2\, NE\1/4\ NE\1/4\, SE\1/4\ 
SE\1/4\ Section 14; W\1/2\ NW\1/4\ Section 24.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.08N., R.03E. Humboldt Meridian: SE\1/4\, S\1/2\ NE\1/4\, SE\1/
4\ NW\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\ Section 22; SW\1/4\, 
SW\1/4\ NW\1/4\, E\1/2\ SE\1/4\ Section 23; W\1/2\, E\1/2\ SE\1/4\ 
Section 26; NE\1/4\ NW\1/4\, N\1/2\ NE\1/4\, SE\1/4\ NE\1/4\ Section 
27; NW\1/4\ SW\1/4\ Section 33; SE\1/4\ NE\1/4\, SE\1/4\ SE\1/4\, 
Section 34; Section 35.
[GRAPHIC] [TIFF OMITTED] TR24MY96.097

    Map and description of CA-11-b taken from United States Fish and 
Wildlife Service 1:100,000 map; Hayfork, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.03N., R.02E. Humboldt Meridian: SE\1/4\ NE\1/4\, SW\1/4\ NW\1/
4\, N\1/2\ N\1/2\ Section 1; NE\1/4\, E\1/2\ NW\1/4\, N\1/2\ SE\1/4\ 
Section 2.
    T.03N., R.03E. Humboldt Meridian: N\1/2\ NE\1/4\, SE\1/4\ NW\1/
4\, NE\1/4\ SW\1/4\, W\1/2\ SE\1/4\, Section 6.
    T.03N., R.04E. Humboldt Meridian: W\1/2\ NE\1/4\, NW\1/4\ 
Section 1; Section 2 except SE\1/4\ SE\1/4\; E\1/2\ NE\1/4\, SE\1/4\ 
SW\1/4\, SE\1/4\ Section 3; W\1/2\ NE\1/4\, NW\1/4\ Section 5; E\1/
2\ NE\1/4\ Section 6.
    T.03N., R.05E. Humboldt Meridian: NE\1/4\, N\1/2\ SE\1/4\ 
Section 6; SW\1/4\ NW\1/4\, N\1/2\ SW\1/4\, SW\1/4\ SW\1/4\ Section 
7; NW\1/4\ NW\1/4\ Section 18.
    T.04N., R.02E. Humboldt Meridian: S\1/2\ SE\1/4\ Section 25.
    T.04N., R.03E. Humboldt Meridian: S\1/2\ NW\1/4\, NW\1/4\ SE\1/
4\, SE\1/4\ SE\1/4\ Section 31.
    T.04N., R.04E. Humboldt Meridian: NE\1/4\ Section 1; E\1/2\ E\1/
2\ Section 12; S\1/2\ Section 25; SE\1/4\ NW\1/4\, NW\1/4\ SW\1/4\, 
SE\1/4\ Section 26; S\1/2\ NE\1/4\, NW\1/4\, N\1/2\ SE\1/4\ Section 
27; N\1/2\, S\1/2\ S\1/2\, NE\1/4\ SW\1/4\, NE\1/4\ SE\1/4\ Section 
28; SW\1/4\ NW\1/4\ Section 29; S\1/2\ NE\1/4\, SW\1/4\, W\1/2\ 
SE\1/4\ Section 30; W\1/2\ NE\1/4\, NW\1/4\, N\1/2\ SE\1/4\, NW\1/4\ 
SW\1/4\ Section 31; SE\1/4\ NW\1/4\, SW\1/4\ Section 32; N\1/2\ N\1/
2\, SE\1/4\ NE\1/4\, SE\1/4\ NW\1/4\, NE\1/4\ SE\1/4\ Section 33; 
Section 34 except N\1/2\ NE\1/4\, S\1/2\ SW\1/4\; Section 35 except 
N\1/2\ N\1/2\.
    T.04N., R.05E. Humboldt Meridian: Sections 1-7; S\1/2\ S\1/2\ 
Section 8; Sections 9-12; Section 13 except E\1/2\ NE\1/4\, E\1/2\ 
SE\1/4\; Section 14; Section 15 except W\1/2\ NW\1/4\ and SW\1/4\; 
NE\1/4\ NW\1/4\, NW\1/4\ NE\1/4\ Section 16; NW\1/4\ SW\1/4\ Section 
17; N\1/2\, N\1/2\ SE\1/4\ Section 18; Section 19 except W\1/2\ W\1/
2\; Section 20; NE\1/4\ NW\1/4\, SW\1/4\ Section 21; NE\1/4\, N\1/2\ 
SE\1/4\, E\1/2\ NW\1/4\ Section 22; Section 23; Section 24 except 
SE\1/4\ SE\1/4\; N\1/2\ NW\1/4\ Section 25; NW\1/4\ NE\1/4\, NW\1/
4\, NW\1/4\ SW\1/4\ Section 26; NW\1/4\ NW\1/4\ Section 28; Section 
29 except S\1/2\ NE\1/4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\; Section 
30; Section 31 except SW\1/4\ SW\1/4\; NW\1/4\, W\1/2\ SW\1/4\ 
Section 32.
    T.04N., R.06E. Humboldt Meridian: W\1/2\ W\1/2\ Section 6; W\1/
2\ Section 7.

[[Page 26318]]

    T.05N., R.04E. Humboldt Meridian: Sections 1-3; E\1/2\ NE\1/4\ 
Section 4; NE\1/4\, N\1/2\ NW\1/4\, E\1/2\ E\1/2\ Section 10; 
Sections 11-13; Section 14 except SW\1/4\, SW\1/4\ NW\1/4\; Section 
23 except W\1/2\ SW\1/4\, W\1/2\ SE\1/4\; Section 24; N\1/2\ NW\1/
4\, S\1/2\ SE\1/4\ Section 25; E\1/2\ NW\1/4\ Section 26.
    T.05N., R.05E. Humboldt Meridian: Section 4 except E\1/2\; 
Sections 5-8; Section 9 except E\1/2\; Section 16 except E\1/2\ E\1/
2\; Sections 17-20; Section 21 except E\1/2\ NE\1/4\; W\1/2\ SW\1/4\ 
Section 22; W\1/2\ SW\1/4\ Section 25; S\1/2\ Section 26; Section 27 
except NE\1/4\, N\1/2\ SE\1/4\; Sections 28-35; W\1/2\ W\1/2\, S\1/
2\ S\1/2\ Section 36.
    T.06N., R.04E. Humboldt Meridian: Sections 13-15; Sections 21-
27; Section 28 except SW\1/4\ NW\1/4\, NW\1/4\ SW\1/4\; Section 33 
except W\1/2\ NW\1/4\, SW\1/4\; Sections 34-35.
    T.06N., R.05E. Humboldt Meridian: W\1/2\, W\1/2\ SE\1/4\ Section 
18; Section 19 except E\1/2\ NE\1/4\; SW\1/4\ SW\1/4\ Section 29; 
Sections 30-31; Section 32 except NE\1/4\, NE\1/4\ SE\1/4\, NE\1/4\ 
NW\1/4\.
[GRAPHIC] [TIFF OMITTED] TR24MY96.098

    Map and description of CA-11-c taken from United States Fish and 
Wildlife Service 1:100,000 map; Garberville, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.02S., R.04E. Humboldt Meridian: E\1/2\ NE\1/4\, SW\1/4\, N\1/
2\ SE\1/4\, SW\1/4\ SE\1/4\ Section 10; SW\1/4\ NW\1/4\ Section 11; 
SE\1/4\ NE\1/4\ Section 15.
    T.01S., R.04E. Humboldt Meridian: SW\1/4\ NW\1/4\, SW\1/4\ SW\1/
4\ Section 1; Section 2 except NE\1/4\ NE\1/4\ and S\1/2\ SW\1/4\; 
NW\1/4\ NE\1/4\ Section 3; SE\1/4\ NW\1/4\ Section 30.
    T.01N., R.04E. Humboldt Meridian: S\1/2\ SE\1/4\ Section 17; 
E\1/2\, E\1/2\ SW\1/4\ Section 20; SW\1/4\ NE\1/4\, SW\1/4\ NW\1/4\, 
SW\1/4\, NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 21; S\1/2\ SW\1/4\ 
Section 22; SW\1/4\ NW\1/4\ Section 23; NW\1/4\ NW\1/4\ Section 27; 
S\1/2\ NE\1/4\, SE\1/4\ NW\1/4\, E\1/2\ SW\1/4\, SE\1/4\ Section 34; 
S\1/2\ NW\1/4\, SW\1/4\, SW\1/4\ SE\1/4\ Section 35.
[GRAPHIC] [TIFF OMITTED] TR24MY96.099

    Map and description of CA-11-d taken from United States Fish and 
Wildlife Service 1:100,000 map; Hoopa and Hayfork, California; 1995.
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.07N., R.05E. Humboldt Meridian: N\1/2\ NE\1/4\ Section 8; 
NE\1/4\, E\1/2\ SE\1/4\, NE\1/4\ NW\1/4\ Section 9; Section 24 
except W\1/2\ W\1/2\; NW\1/4\, NE\1/4\ SE\1/4\ Section 25 ; SW\1/4\ 
NW\1/4\, W\1/2\ SW\1/4\, NW\1/4\, NE\1/4\ SE\1/4\ Section 34.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only Federal lands designated as Late 
Successional Reserves described within the following areas:

    T.06N., R.06E. Humboldt Meridian: W\1/2\ W\1/2\ Section 1; 
Sections 2-3; Section 4 except W\1/2\ SW\1/4\, SE\1/4\ SW\1/4\; 
NE\1/4\ NE\1/4\ Section 9; SE\1/4\, N\1/2\, SE\1/4\ NE\1/4\ Section 
10; Section 11 except E\1/2\ E\1/2\, S\1/2\ SE\1/4\; NW\1/4\ NE\1/
4\, SW\1/4\ SW\1/4\, N\1/2\ SW\1/4\, NW\1/4\ Section 14; NE\1/4\ 
NE\1/4\, E\1/2\ SE\1/4\ Section 15.
    T.07N., R.05E. Humboldt Meridian: Sections 1-3; Section 4 except 
NW\1/4\ NW\1/4\; E\1/2\, Section 5; Sections 10-13; N\1/2\ N\1/2\, 
SE\1/4\ NE\1/4\ Section 14.
    T.07N., R.06E. Humboldt Meridian: W\1/2\ NE\1/4\, N\1/2\ SW\1/4\ 
NW\1/4\, NW\1/4\ SE\1/4\ Section 2; Section 3 except S\1/2\ SE\1/4\, 
SE\1/4\ SW\1/4\; Sections 4-8; NW\1/4\, S\1/2\ Section 9; SW\1/4\, 
NW\1/4\ SE\1/4\, S\1/2\ SE\1/4\ Section 10; SW\1/4\ SW\1/4\ Section 
11; SE\1/4\ SE\1/4\ Section 12; Section 13 except NW\1/4\ NW\1/4\; 
Sections 14-23; Section 24 except SE\1/4\ SE\1/4\; Section 25 except 
SE\1/4\ SE\1/4\; Sections 26-30; E\1/2\ E\1/2\, NW\1/4\ NE\1/4\ 
Section 31; Section 32 except SE\1/4\ SW\1/4\; Sections 33-35; W\1/
2\ SW\1/4\, NW\1/4\ Section 36.
    T.07N., R.07E. Humboldt Meridian: SW\1/4\ SE\1/4\, SW\1/4\ 
Section 6; SW\1/4\, NW\1/4\, W\1/2\ NE\1/4\ Section 7.
    T.08N., R.05E. Humboldt Meridian: E\1/2\, E\1/2\ NW\1/4\, NE\1/
4\ SW\1/4\ Section 1; E\1/2\ E\1/2\, E\1/2\ NW\1/4\ Section 12; 
NE\1/4\ NE\1/4\ Section 13; SE\1/4\ SE\1/4\ Section 25; SE\1/4\ 
SE\1/4\ Section 33; SE\1/4\ NE\1/4\, S\1/2\ Section 34; S\1/2\, S\1/
2\ N\1/2\ Section 35; Section 36 except NW\1/4\ NW\1/4\.
    T.08N., R.06E. Humboldt Meridian: W\1/2\ W\1/2\ Section 4; 
Sections 5-8; W\1/2\ W\1/2\ Section 9; S\1/2\ SW\1/4\, SW\1/4\ SE\1/
4\ Section 14; SW\1/4\, S\1/2\ SE\1/4\ Section 15; S\1/2\ Section 
16; Sections 17-18; Section 19 except W\1/2\ W\1/2\; Sections 20-22; 
W\1/2\, W\1/2\ NE\1/4\, NW\1/4\ SE\1/4\ Section 23; Sections 27-29; 
Section 30 except W\1/2\ NW\1/4\; Sections 31-34; W\1/2\ SE\1/4\, 
SE\1/4\ NW\1/4\, SW\1/4\ Section 35.
    T.09N., R.05E. Humboldt Meridian: Section 12; Section 13; E\1/2\ 
SE\1/4\, SE\1/4\ NE\1/4\ Section 14; E\1/2\ E\1/2\, W\1/2\ NE\1/4\, 
Sections 23-25; E\1/2\ NE\1/4\ Section 26; Section 36 except SW\1/4\ 
SW\1/4\.
    T.09N., R.06E. Humboldt Meridian: N\1/2\ SW\1/4\ Section 1; 
Section 2 except SE\1/4\ SE\1/4\; Section 3 except N\1/2\ NW\1/4\; 
N\1/2\ Section 4; SE\1/4\, E\1/2\ SW\1/4\ Section 5; SE\1/4\, SE\1/
4\ NE\1/4\, E\1/2\ SW\1/4\ Section 7; Sections 8-9; N\1/2\ NE\1/4\, 
SW\1/4\ NE\1/4\, W\1/2\ SE\1/4\, W\1/2\ Section 10; Section 16 
except SE\1/4\; Sections 17-20; W\1/2\ E\1/2\, W\1/2\ Section 21; 
NW\1/4\, W\1/2\ SW\1/4\ Section 28; Sections 29-32; W\1/2\ W\1/2\ 
Section 33.
    T.10N., R.06E. Humboldt Meridian: S\1/2\ S\1/2\, NE\1/4\ SW\1/
4\, NW\1/4\ SE\1/4\ Section 35; S\1/2\ S\1/2\ Section 36.
[GRAPHIC] [TIFF OMITTED] TR24MY96.100

    Map and description of CA-12 taken from United States Fish and 
Wildlife Service 1:100,000 map; California; 1995.
    Critical Habitat includes only City lands described within the 
following areas:

    T.04S., R.05W. Mount Diablo Meridian: N\1/2\ SE\1/4\ Section 32; 
S\1/2\ NW\1/4\, SE\1/4\, SW\1/4\ NE\1/4\, N\1/2\ SW\1/4\, SE\1/4\ 
SW\1/4\ Section 33; SW\1/4\ SW\1/4\ Section 34.
    T.05S., R.05W. Mount Diablo Meridian: NW\1/4\, NW\1/4\ SW\1/4\ 
Section 3; SE\1/4\ NE\1/4\, N\1/2\ N\1/2\, NE\1/4\ SE\1/4\ Section 
4.

[[Page 26319]]

[GRAPHIC] [TIFF OMITTED] TR24MY96.101

    Map and description of CA-13 taken from United States Fish and 
Wildlife Service 1:100,000 map; California; 1995.
    Critical Habitat includes only County lands bounded by the 
following description within Spanish Land Grant Canada de Raymundo:
    Starting at the intersection of West Union Creek with the San 
Francisco State Fish and Game Refuge boundary, west along the San 
Francisco State Fish and Game Refuge boundary to the intersection with 
State Highway 35, southeast on State Highway 35 to the intersection 
with the San Francisco State Fish and Game Refuge boundary, southeast 
along the San Francisco State Fish and Game Refuge boundary to Woodside 
City boundary, northeast along Woodside City boundary to the 
intersection with Greer Road, northwest on Greer Road to the 
intersection with West Union Creek, north along West Union Creek to the 
intersection with the San Francisco State Fish and Game Refuge 
boundary.
[GRAPHIC] [TIFF OMITTED] TR24MY96.102

    Map and description of CA-14-a taken from United States Fish and 
Wildlife Service 1:100,000 map; California; 1995.
    Critical Habitat includes only County lands described within the 
following areas:

    T.07S., R.03W. Mount Diablo Meridian: S\1/2\, SE\1/4\ NE\1/4\ 
Section 31; W\1/2\ SW\1/4\, SW\1/4\ NW\1/4\ Section 32.
    T.07S., R.04W. Mount Diablo Meridian: S\1/2\ NE\1/4\, SE\1/4\ 
Section 22; S\1/2\ SW\1/4\, NW\1/4\ SW\1/4\ Section 23; SW\1/4\, 
W\1/2\ SE\1/4\, S\1/2\ NW\1/4\, SW\1/4\ NE\1/4\ Section 25; Section 
26 except SW\1/4\, NE\1/4\ NE\1/4\, S\1/2\ SE\1/4\, W\1/2\ NW\1/4\; 
E\1/2\, SE\1/4\ NW\1/4\ Section 33; S\1/2\, SW\1/4\ NW\1/4\ Section 
34; Section 35 except N\1/2\ N\1/2\; Section 36 except E\1/2\ NE\1/
4\.
    T.08S., R.03W. Mount Diablo Meridian: Sections 6-7; S\1/2\ S\1/
2\ Section 8; SW\1/4\ SW\1/4\ Section 9; NW\1/4\ Section 16; N\1/2\ 
N\1/2\, SW\1/4\ NW\1/4\ Section 17; N\1/2\, N\1/2\ SE\1/4\ Section 
18.
    T.08S., R.04W. Mount Diablo Meridian: Sections 1-2; SE\1/4\ 
Section 3; NE\1/4\ NE\1/4\, N\1/2\ NW\1/4\ Section 10; NE\1/4\, N\1/
2\ NW\1/4\ Section 11; Section 12 except SW\1/4\ SW\1/4\.

    Critical Habitat includes only Private lands described within the 
following areas:

    T.07S., R.04W. Mount Diablo Meridian: N\1/2\ NE\1/4\ Section 35.
    T.08S., R.04W. Mount Diablo Meridian: S\1/2\ Section 4; SE\1/4\ 
Section 5; Sections 7-8; N\1/2\ Section 9; Section 16-18; Section 20 
except NW\1/4\, SE\1/4\ SE\1/4\; NW\1/4\ Section 21.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only State lands described within the 
following areas:

    T.07S., R03W. Mount Diablo Meridian: W\1/2\ SE\1/4\, SW\1/4\, 
SE\1/4\ NW\1/4\, SW\1/4\ NE\1/4\ Section 33.
    T.08S., R03W. Mount Diablo Meridian: N\1/2\ SW\1/4\ Section 2; 
S\1/2\ Section 3; E\1/2\ Section 4; S\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, 
SW\1/4\, W\1/2\ SE\1/4\ Section 5; Section 8 except SW\1/4\ SW\1/4\; 
Section 9 except S\1/2\ SE\1/4\, NE\1/4\ SE\1/4\, SE\1/4\ NE\1/4\; 
NW\1/4\ Section 10.
    T.08S., R04W. Mount Diablo Meridian: Section 19; S\1/2\ SE\1/4\ 
Section 20; Section 21 except NW\1/4\; Section 22 except SE\1/4\, 
E\1/2\ SW\1/4\; Section 23 except S\1/2\ S\1/2\; W\1/2\ SW\1/4\ 
Section 24; NW\1/4\, NW\1/4\ NE\1/4\ Section 28; Sections 29-30; 
N\1/2\ Section 32.

    Critical Habitat includes only State lands within Rancho Punta del 
Ano Nuevo Spanish Land Grant bounded by the following description:
    Starting at the intersection of Butano Park Road with Cloverdale 
Road, south along Cloverdale Road to the intersection with Gazos Creek 
Road, east along Gazos Creek Road to the intersection with Punta del 
Ano Nuevo Spanish Land Grant boundary, north along the Punta del Ano 
Nuevo Spanish Land Grant boundary to the intersection with Butano Park 
Road, west along Butano Park Road to the intersection of Butano Park 
Road with Cloverdale Road.
[GRAPHIC] [TIFF OMITTED] TR24MY96.103

    Map and description of CA-14-b taken from United States Fish and 
Wildlife Service 1:100,000 map; California; 1995.
Description of Lands Using Protracted Public Land Survey Lines
    Critical Habitat includes only State lands described within the 
following areas:

    T.08S., R.03W. Mount Diablo Meridian: SE\1/4\ SW\1/4\, S\1/2\ 
SE\1/4\ Section 19; S\1/2\ SW\1/4\ Section 20; NE\1/4\ NE\1/4\, 
SW\1/4\ SE\1/4\ Section 26, Section 29 ; Section 30 except NW\1/4\ 
NW\1/4\; Sections 31-33.
    T.08S., R.04W. Mount Diablo Meridian: SE\1/4\, S\1/2\ SW\1/4\ 
Section 25; S\1/2\ Section 35; Section 36.
    T.09S., R.03W. Mount Diablo Meridian: NW\1/4\ Section 3; 
Sections 4-8; SE\1/4\ NW\1/4\, SW\1/4\, N\1/2\ NE\1/4\, SE\1/4\ 
NE\1/4\, N\1/2\ SE\1/4\, SE\1/4\ SE\1/4\ Section 9; S\1/2\ SW\1/4\, 
NW\1/4\ SW\1/4\, Section 10; NW\1/4\ Section 15; NE\1/4\, N\1/2\ 
SE\1/4\ Section 16; W\1/2\ NW\1/4\ Section 17; Section 18; N\1/2\ 
NW\1/4\, SE\1/4\ NW\1/4\, N\1/2\ SW\1/4\ Section 19; S\1/2\ NE\1/4\, 
NW\1/4\ SE\1/4\, SE\1/4\ SE\1/4\ Section 30; S\1/2\ N\1/2\, NE\1/4\ 
NE\1/4\ Section 31.
    T.09S., R.04W. Mount Diablo Meridian: Sections 1-2; Section 3 
except N\1/2\ NW\1/4\, E\1/2\ SW\1/4\; NW\1/4\ NE\1/4\, SE\1/4\ 
NE\1/4\ Section 4; SE\1/4\, S\1/2\ SW\1/4\, NE\1/4\ SW\1/4\, S\1/2\ 
NE\1/4\ Section 9; Section 10 except NW\1/4\; Sections 11-12; 
Section 13 except SW\1/4\ SE\1/4\; Section 14; Section 15 except 
SE\1/4\ SE\1/4\; Section 16; NE\1/4\ NE\1/4\ Section 21; Section 22 
except SW\1/4\ SE\1/4\, SE\1/4\ SW\1/4\; Section 23; Section 24; 
N\1/2\ NW\1/4\, SE\1/4\ SE\1/4\, SE\1/4\ SW\1/4\ Section 25; W\1/2\, 
W\1/2\ E\1/2\ Section 26; Section 27 except NW\1/4\ NW\1/4\; Section 
34; NE\1/4\ NW\1/4\, W\1/2\ W\1/2\ SE\1/4\ SW\1/4\ Section 35.
    T.10S., R.04W. Mount Diablo Meridian: Sections 2-3.

    Critical Habitat includes only Private lands described within the 
following areas:

    T.09S., R.04W. Mount Diablo Meridian: Section 16; Section 21 
except S\1/2\, E\1/2\ NE\1/4\.

    Critical Habitat includes only State lands bounded by the following 
description within Spanish Land Grant Punta de Ano Nuevo:

[[Page 26320]]

    Starting at the intersection of the Spanish Land Grant boundary 
with Green Oaks Creek, north along the Spanish Land Grant boundary to 
the intersection with Gazos Creek, west along Gazos Creek to the 
intersection with State Highway 1, south on State Highway 1 to the 
intersection with Green Oaks Creek, and east along Green Oaks Creek to 
the Spanish Land Grant boundary.
[GRAPHIC] [TIFF OMITTED] TR24MY96.104

    Map and description of CA-14-c taken from United States Fish and 
Wildlife Service 1:100,000 map; California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.08S., R.02W. Mount Diablo Meridian: SW\1/4\, S\1/2\ SE\1/4\ 
Section 17; S\1/2\ Section 18; Section 19 except S\1/2\ SW\1/4\, 
NW\1/4\ SW\1/4\; Section 20 except SE\1/4\ SE\1/4\; N\1/2\ Section 
29.
[GRAPHIC] [TIFF OMITTED] TR24MY96.105

    Map and description of CA-15 taken from United States Fish and 
Wildlife Service 1:100,000 map; California; 1995.
    Critical Habitat includes only State lands described within the 
following areas:

    T.10S., R.02W. Mount Diablo Meridian: S\1/2\ S\1/2\, NW\1/4\ 
SW\1/4\ Section 6; Section 7 except S\1/2\ SW\1/4\, ; SW\1/4\, S\1/
2\ NW\1/4\, SW\1/4\ SE\1/4\, NW\1/4\ NW\1/4\ Section 8; SW\1/4\, 
S\1/2\ NW\1/4\, NW\1/4\ NW\1/4\, S\1/2\ SE\1/4\, NW\1/4\ SE\1/4\ 
Section 16; Section 17 except SW\1/4\ SW\1/4\; SE\1/4\ NE\1/4\, 
NE\1/4\ SE\1/4\ Section 18; N\1/2\ NW\1/4\ Section 20; NE\1/4\, E\1/
2\ NW\1/4\ Section 21.

    Critical Habitat includes only State lands within the following 
area:
    Spanish Land Grant Canada del Rincon en el Rio de San Lorenzo de 
Santa Cruz west of Graham Hill Road.
    Critical Habitat includes only State lands bounded by the following 
description within Spanish Land Grant Rancho Refugio:
    Starting at the intersection of State Highway 1 with the western 
boundary of the Rancho Refugio Spanish Land Grant, proceeding east on 
State Highway 1 to its intersection with Moore Creek, north along Moore 
Creek to the intersection with Empire Grade Road, northwest on Empire 
Grade Road to the intersection with the eastern boundary of the Rancho 
Refugio Spanish Land Grant, west and then southwest along the Rancho 
Refugio Spanish Land Grant boundary to the intersection with State 
Highway 1.
[GRAPHIC] [TIFF OMITTED] TR24MY96.106

* * * * *
    Dated: May 15, 1996.
George T. Frampton, Jr.,
Assistant Secretary for Fish and Wildlife and Parks.
[FR Doc. 96-12647 Filed 5-23-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

FR Doc. 96-12573 Personal Protective Equipment for Shipyard Employment (PPE)
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26322-26360]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12573]

      

[[Page 26321]]

_______________________________________________________________________

Part III

Department of Labor

_______________________________________________________________________

Occupational Safety and Health Administration

_______________________________________________________________________

29 CFR Part 1915

Personal Protective Equipment for Shipyard Employment; Final Rule

Federal Register / Vol. 61, No. 102 / Friday, May 24, 1996 / Rules 
and Regulations

[[Page 26322]]

DEPARTMENT OF LABOR

Occupational Safety and Health Administration

29 CFR Part 1915

[Docket No. S-045]
RIN 1218-AA74 (AB06)

Personal Protective Equipment for Shipyard Employment (PPE)

AGENCY: Occupational Safety and Health Administration, Department of 
Labor.

ACTION: Final Rule.

-----------------------------------------------------------------------

SUMMARY: The Occupational Safety and Health Administration (OSHA) is 
revising its standards for Personal Protective Equipment (PPE) for 
Shipyard Employment, 29 CFR part 1915, subpart I. The final rule 
updates, reorganizes, and simplifies shipyard employment PPE standards 
into a comprehensive framework that encompasses the shipbuilding, ship 
repair, and shipbreaking industries. Where appropriate, the final rule 
deletes existing specification-oriented provisions that limit employer 
innovation and incorporates performance-oriented language.

EFFECTIVE DATES: The final rule becomes effective August 22, 1996 
except for Secs. 1915.152(b), 1915.152(e), 1915.159(d), 1915.160(d), 
will not become effective until an Office of Management and Budget 
(OMB) Control number is received and displayed for these ``collections 
of information'' in accordance with the Paperwork Reduction Act of 1995 
(44 U.S.C. 3501 et seq.). The incorporations by reference of certain 
publications listed in this final rule is approved by the Director of 
the Federal Register as of August 22, 1996.
    Other Dates: Written comments on the paperwork requirements of this 
final rule must be submitted on or before July 23, 1996.

ADDRESSES: In compliance with 28 U.S.C. 2112(a), the Agency designates 
the Associate Solicitor for Occupational Safety and Health, Office of 
the Solicitor, Room S-4004, U.S. Department of Labor, 200 Constitution 
Avenue, N.W., Washington, D.C. 20210 for receipt of petitions for 
review of the standard.
    Comments on the paperwork requirements of this final rule are to be 
submitted to the Docket Office, Docket No. S-045, U.S. Department of 
Labor, Room N-2625, 200 Constitution Ave., NW., Washington, DC 202l0, 
telephone (202) 219-7894. Written comments limited to 10 pages or less 
in length may also be transmitted by facsimile to (202) 219-5046.

FOR FURTHER INFORMATION CONTACT: Ms. Anne C. Cyr, Acting Director, 
Office of Information, Division of Consumer Affairs, Room N-3647, U.S. 
Department of Labor, 200 Constitution Avenue, N.W., Washington, D.C. 
20210; Telephone (202) 219-8151.

SUPPLEMENTARY INFORMATION:

Table of Contents

I. Background
II. Workplace Hazards
III. Summary and Explanation of Final Rule
IV. Summary of Final Economic Analysis, Regulatory Flexibility 
Certification, and Environmental Impact Assessment
V. Paperwork Burden
VI. Statutory Considerations
VII. Federalism
VIII. State Plans
IX. Authority

I. Background

    In May 1971, the Occupational Safety and Health Administration 
(OSHA), under authority granted by section 6(a) of the Occupational 
Safety and Health Act of 1970 (29 U.S.C. 655), adopted Federal 
standards issued under section 41 of the Longshore and Harbor Workers' 
Compensation Act (33 U.S.C. 941), as standards applicable to ship 
repairing (29 CFR part 1915), shipbuilding (29 CFR part 1916), and 
shipbreaking (29 CFR part 1917) operations. OSHA also adopted other 
Federal standards and national consensus standards as general industry 
standards (29 CFR part 1910) and construction industry standards (29 
CFR part 1926), which apply to shipyard hazards and working conditions 
not specifically covered by standards in parts 1915, 1916, or 1917.
    On April 20, 1982 (47 FR 16984), the ship repairing, shipbuilding, 
and shipbreaking standards were consolidated into 29 CFR part 1915 
``Occupational Safety and Health Standards for Shipyard Employment.'' 
The purpose of the consolidation was to eliminate duplicative 
provisions. The consolidation did not alter substantive requirements of 
these standards, nor did it affect the applicability of the general 
industry and construction standards in 29 CFR parts 1910 and 1926, 
respectively, to hazards or conditions in shipyard employment not 
addressed in the consolidated part 1915.
    Later in 1982, the Shipbuilders Council of America (SCA) and the 
American Waterways Shipyard Conference (AWSC) requested that OSHA 
identify the specific provisions of the general industry standards that 
apply to shipyards and then consolidate them into the existing part 
1915 provisions, making one set of shipyard employment standards. OSHA 
agreed that such consolidation was appropriate, and decided to begin 
work on a subpart-by-subpart basis.
    As part of that effort, OSHA published a Notice of Proposed 
Rulemaking (NPRM) in the Federal Register for subpart I of part 1915 
(Personal Protective Equipment (PPE), November 29, 1988, 53 FR 48092). 
In particular, the proposed rule updated the pertinent references to 
national consensus standards, incorporated Sec. 1910.134 (respiratory 
protection) by reference to replace the less comprehensive provisions 
in Sec. 1915.152, and added requirements for hazard assessment, 
training, fall protection systems, and positioning device systems. OSHA 
received 10 comments in response to the NPRM. Those comments are 
discussed in the Summary and Explanation section of this document, 
below.
    A short time after the November 1988 publication of the proposed 
rule on PPE, the Shipyard Employment Standards Advisory Committee 
(SESAC) was established. SESAC was chartered to provide OSHA with 
guidance in revising, consolidating, and modernizing the varying sets 
of regulations that were being applied in the shipyard industry to 
produce a truly vertical standard for all shipyard employment. The 
intended result of this activity was the development of a single set of 
occupational safety and health standards for shipyard employment that 
would cover vessels, vessel sections and related activities. The newly 
developed shipyard employment standards would apply to all shipyard 
employment. SESAC provided OSHA with comments on PPE-related issues, 
and their comments are discussed in the Summary and Explanation below.
    Following publication of the proposed 1915 shipyard PPE standard, 
OSHA initiated two rulemakings to address General Industry Personal 
Protective Equipment (PPE) standards. The first of these PPE 
rulemakings (NPRM at 54 FR 33832, August 16, 1989) covered all PPE 
(such as eye, face, hand, and foot) other than respiratory protection, 
electrical protective equipment, personal protective systems, and 
positioning device systems. The Agency published the final rule for 
this rulemaking on April 6, 1994 (59 FR 16334). The Agency also 
initiated a second general industry rulemaking to add requirements for 
personal fall arrest systems and positioning systems to the general 
industry PPE standards (Docket S-057; NPRM at 55 FR 12323, April 10,

[[Page 26323]]

1990). This rulemaking had not yet been concluded.
    The Agency determined that the information in the above-noted 
rulemaking records was relevant to the issues raised in the Shipyard 
PPE proposal. Accordingly, on July 6, 1994, OSHA reopened the Shipyard 
PPE rulemaking record (59 FR 34586) to incorporate the General Industry 
PPE dockets and to allow the public an opportunity to comment. The 
Agency indicated that it was considering more detailed guidance 
regarding: Adequate training requirements; verification of the proposed 
hazard assessment and training requirements through written 
certification; and prohibition of the use of body belts and non-locking 
snaphooks. OSHA subsequently revised its requirements for fall 
protection in construction (final rule at 59 FR 40672, August 9, 1994). 
The final rule, containing requirements for personal fall protection 
equipment similar to those in the shipyard PPE proposal, prohibited the 
use of body belts in personal fall arrest systems (PFAS) 
(Sec. 1926.502(d) introductory text) and the use of non-locking 
snaphooks in PFAS (Sec. 1926.502(d)(5)) and in positioning systems 
(Sec. 1926.502(e)(7)). Those prohibitions take effect on January 1, 
1998.
    The shipyard PPE reopening comment period ended August 22, 1994. 
OSHA received 13 comments, including one hearing request. Those 
comments are discussed in the Summary and Explanation section below.
    In lieu of a hearing, OSHA agreed to hold an informal public 
meeting (59 FR 64173, December 13, 1994) to allow comments and 
testimony on the issues raised in the reopening. At the public meeting 
on January 25, 1995, there were five oral presentations and five 
written submissions, which are discussed in the Summary and Explanation 
section. The rulemaking record closed on February 28, 1995.

II. Workplace Hazards

    OSHA has determined that employees in shipyards are exposed to a 
significant risk of injury from hazards that can be mitigated by the 
use of suitable personal protective equipment. OSHA has also concluded 
that compliance with the final standard will substantially reduce 
employee exposure to PPE-related hazards.
    The shipyard industry has had one of the highest rates of injuries 
of any industry for many years. In 1992, the shipyard industry, SIC 
3731, had an injury rate of 34.2 per 100 full-time employees 
(``Occupational Injuries and Illnesses: Counts, Rates, and 
Characteristics, 1992,'' published by the Bureau of Labor Statistics in 
April, 1995). Approximately half of these injuries were severe enough 
to result in lost time from work. These numbers mean that a shipyard 
employee has about a 1 in 3 chance (34 percent) of experiencing an 
injury at work annually and a 1 in 10 chance every year of being 
injured seriously enough to require time away from work to recuperate.
    In comparison, the average annual risk of injury for all employees 
in the United States was about 9 per 100 full-time employees in 1992; 
for the manufacturing sector of the economy, the annual injury rate was 
about 11 per 100 full-time employees.
    Table 1 presents estimates of lost-workday injuries by body part 
based on 1992 Bureau of Labor Statistics (BLS) data. These estimates 
are consistent with injury data from a Department of Transportation 
Maritime Administration survey and the Agency's analysis of OSHA 200 
Forms (discussed further in the Benefits section of the summary of the 
Economic Analysis, presented later in this Preamble). Table 2 presents 
BLS lost workday injury data by nature of injury.

                Table 1.--BLS Estimates of Shipyard injuries involving Lost Workdays by Body Part               
----------------------------------------------------------------------------------------------------------------
                                                                                Number of                       
                      Body part                          Number of 1992     extrapolated 1994      Percent (%)  
                                                          injuries (a)         injuries (b)                     
----------------------------------------------------------------------------------------------------------------
Head, unspecified...................................                   73                   63               0.6
Ear(s)..............................................                    0                    0               0.0
Eyes(s).............................................                1,080                  925               9.4
Face................................................                   51                   44               0.4
Scalp...............................................                   91                   78               0.8
Neck................................................                  350                  300               3.0
Arm(s) unspecified..................................                   49                   42               0.4
Elbow...............................................                  265                  227               2.3
Forearm.............................................                  128                  110               1.1
Wrist...............................................                  478                  409               4.1
Hand(s).............................................                  508                  435               4.4
Finger(s)...........................................                  720                  617               6.2
Upper extremities, multiple.........................                    0                    0               0.0
Trunk, unspecified..................................                    0                    0               0.0
Abdomen.............................................                   88                   75               0.8
Back, unspecified...................................                  954                  817               8.3
Back, lumbar........................................                1,198                1,026              10.4
Back, thoracic......................................                  168                  144               1.5
Chest...............................................                  289                  247               2.5
Hip.................................................                  306                  262               2.7
Shoulder(s).........................................                  601                  515               5.2
Trunk, multiple parts...............................                    0                    0               0.0
Lower extremities, unspecified......................                    0                    0               0.0
Leg(s), unspecified.................................                   59                   51               0.5
Thighs..............................................                   89                   76               0.8
Knee(s).............................................                1,073                  919               9.3
Lower leg(s)........................................                  123                  105               1.1
Leg(s), multiple....................................                    0                    0               0.0
Ankle(s)............................................                  624                  534               5.4
Foot/feet...........................................                  488                  418               4.2
Toe(s)..............................................                  123                  105               1.1
Lower extremities, multiple.........................                    0                    0               0.0

[[Page 26324]]

                                                                                                                
Multiple body parts.................................                  674                  577               5.8
Circulatory system..................................                    0                    0               0.0
Digestive system....................................                    0                    0               0.0
Excretory system....................................                    0                    0               0.0
Nervous system......................................                    0                    0               0.0
Respiratory system..................................                    0                    0               0.0
Body parts, NEC.....................................                  163                  140               1.4
Not identified by body part.........................                  720                  617               6.2
                                                     -----------------------------------------------------------
    Total...........................................               11,533                9,876             100.0
----------------------------------------------------------------------------------------------------------------
(a) Bureau of Labor Statistics. Survey of Occupational injuries and illnesses, 1                                
(b) Extrapolation based on decline in shipyard employment of 14.4 percent bet 1992 and 1994.                    

            Table 2.--BLS Estimates of Shipyard Injuries Involving Lost Workdays, by Nature of Injury           
----------------------------------------------------------------------------------------------------------------
                                                                                Number of                       
                  Nature of injury                       Number of 1992     extrapolated 1994      Percent (%)  
                                                          injuries (a)         injuries (b)                     
----------------------------------------------------------------------------------------------------------------
Amputation..........................................                    0                    0               0.0
Burn (heat).........................................                  410                  351               3.6
Burn (chemical).....................................                   80                   69               0.7
Concussion..........................................                    0                    0               0.0
Infective/parasitic disease.........................                   NA                   NA                NA
Contusion/bruise....................................                2,085                1,785              18.1
Cut/laceration/puncture.............................                  622                  533               5.4
Dermatitis..........................................                    0                    0               0.0
Dislocation, unspecified............................                   88                   75               0.8
Electric shock......................................                    0                    0               0.0
Fracture............................................                  558                  478               4.8
Low temperature exposure............................                   NA                   NA                NA
Hearing loss or impairment..........................                    0                    0               0.0
Inflammation of joints..............................                  114                   98               1.0
Poisoning...........................................                  114                   98               1.0
Radiation effects...................................                  213                  182               1.8
Scratches/abrasions.................................                  728                  623               6.3
Sprains/strains, unspecified........................                5,044                4,319              43.7
Torn ligaments......................................                   NA                   NA                NA
Sprains/strains, NEC................................                   NA                   NA                NA
Multiple injuries...................................                  308                  264               2.7
Circulatory system condition........................                    0                    0               0.0
Eye diseases........................................                    0                    0               0.0
Nervous system condition............................                  255                  218               2.2
Respiratory system condition........................                    0                    0               0.0
Ill-defined condition...............................                    0                    0               0.0
Other injury, NEC...................................                  216                  185               1.9
Not identified by nature............................                  698                  598               6.1
    Total...........................................               11,533                9,876             100.0
----------------------------------------------------------------------------------------------------------------
(a) Bureau of Labor Statistics. Survey of Occupational Injuries and Illnesses, 19                               
(b) Extrapolation based on decline in shipyard employment of 14.4 percent between 1992 and 1994.                
NA: Not applicable. Nature of injury category not incuded in BLS tabulations.                                   

    Shipyard employment typically involves fabrication and repair of 
large steel plates, beams, and pipes as well as painting and coating 
operations and other outfitting activities such as electrical work, 
ventilation and sheet metal work, and work on propulsion systems. 
Welding is a common production technology, requiring grinding and 
chipping of welds and accounting for many eye injuries. Employees also 
frequently work in awkward positions, out-of-doors throughout the year, 
on scaffolds, and in enclosed or confined spaces. The shipyard 
industry's relatively high employment turnover rate contributes to the 
high rates of injuries, because newly hired workers tend to be less 
well trained and have a higher frequency of accidents.
    The Agency has concluded that PPE-related hazards pose a 
significant risk of serious injury to shipyard employees, and that 
compliance with the PPE standard is needed to substantially reduce that 
risk. The Agency has estimated that compliance with the final PPE 
regulation will significantly reduce the likelihood of an injury--from 
34.2 to 21 per 100 full-time employees per year.
    For a full discussion of the benefits of the final standard see the 
summary of the Economic Analysis presented below in this preamble or 
the full Economic Analysis, which is in the docket.

III. Summary and Explanation of Final Rule

    In this section of the preamble, OSHA explains how the final rule 
relates to the proposed and existing standards, and

[[Page 26325]]

how the comments and testimony presented on each provision influenced 
the drafting of the final rule. This section also addresses issues 
raised in the July 6, 1994, reopening notice and the December 13, 1994, 
public meeting notice. Except where otherwise indicated, proposed 
provisions that did not elicit comments are being promulgated as 
proposed, for reasons stated in the preamble to the proposed rule (53 
FR 48151-48158).
    As discussed above, on April 6, 1994, OSHA issued a final rule for 
its rulemaking on PPE used in general industry (59 FR 16334) (part 
1910, subpart I, Docket S-060). That document updated the regulation of 
PPE for eye and face (Sec. 1910.133), head (Sec. 1910.135) and foot 
protection (Sec. 1910.136), and added provisions for hazard assessment, 
PPE selection, disposal and training (Sec. 1910.132 (d)-(f)), and hand 
protection (Sec. 1910.138). The proposed rule (54 FR 33832, August 16, 
1989) was consistent with the corresponding proposed rule for shipyard 
PPE. However, based on the rulemaking record, OSHA revised the general 
industry proposal to address training and the documentation of 
compliance with the hazard assessment and training requirements in more 
detail. Given the similarity of the PPE used in general industry and 
shipyard employment, OSHA determined that the information generated in 
this general industry rulemaking was relevant to the drafting of the 
shipyard PPE standards, as well.
    Also, proposed part 1910 subpart I, PPE (Fall Protection Systems) 
(55 FR 13423, April 10, 1990) set criteria for the proper selection, 
use and maintenance of personal fall arrest systems (Secs. 1910.128, 
1910.129, and 1910.131) and positioning device systems (Secs. 1910.128 
and 1910.130) in general industry. The part 1910 subpart I proposal 
relied heavily on the approach taken by the Agency in its final rule on 
Powered Platforms for Exterior Building Maintenance, Sec. 1910.66 (54 
FR 31456, July 28, 1989, Docket S-700A). In the Preamble to the 1910 
subpart I proposal, OSHA determined that the requirements for personal 
fall arrest systems used by employees on powered platforms should be 
the same as those for personal fall arrest systems used by employees in 
other occupations (55 FR at 13430).
    Based on the record developed for the general industry fall 
protection PPE rulemaking (Docket S-057), OSHA decided that it was 
appropriate to consider prohibiting the use of non-locking snaphooks in 
personal fall arrest and positioning device systems and to consider 
prohibiting the use of body belts in personal fall arrest systems. 
Recently, the Agency included such prohibitions in the final rule for 
fall protection in construction (59 FR 40672, August 9, 1994). As 
stated above, the Agency has determined that OSHA's fall protection PPE 
standards should be consistent with each other.
    Therefore, based on its policy of promoting consistent regulation 
of PPE across industry lines, the Agency concluded that the information 
generated on PPE in general industry was relevant to the use of that 
PPE in shipyards, as well.
    Accordingly, OSHA incorporated Dockets S-057 and S-060 into the 
shipyard PPE rulemaking record and reopened the comment period for part 
1915 subpart I to provide an opportunity for public comment on the 
newly incorporated materials (59 FR 34586, July 6, 1994). The Agency 
provided additional opportunity for public input on these materials (59 
FR 64173, December 13, 1995) at an informal public meeting on January 
25, 1995.
    In addition, OSHA has added certain personal fall arrest criteria, 
Sec. 1910.159 (a)(4), (a)(5), (a)(7), (c)(2), (c)(3) and (c) (7) to the 
final rule, because the need for such requirements has been established 
through the corresponding General Industry and Construction rulemaking 
proceedings. These requirements are discussed further, below.
    OSHA has concluded that the PPE needed in shipyard employment does 
not differ markedly from that needed in general industry or in 
construction, and that the standards covering PPE should not differ 
markedly either. The final rule reflects this determination and 
incorporates OSHA's review of the existing rulemaking record, including 
the materials incorporated from other PPE-related dockets.

Section 1915.151  Scope, Application, and Definitions Applicable to 
This Subpart

    Final rule paragraph (a) sets forth the scope and application of 
Subpart I. This subpart applies to all work in shipyard employment, 
regardless of geographic location. This language is consistent with 
that in recently published part 1915 subpart B [Sec. 1915.11(a)][59 FR 
37816, July 25, 1994].
    Proposed paragraph (a)(1) stated that this subpart would cover PPE 
provided for and used by shipyard workplaces and operations (including 
shipbuilding, ship repairing, and shipbreaking), but would not apply to 
construction operations in shipyards covered by part 1926.
    Newport News Shipbuilding (NNS) stated [Ex. 6-2] that the term 
``provided'' should be changed to ``made available'' because the 
suggested language was consistent with that in existing Sec. 1915.153 
and with current industry practice. However, the Agency has deleted the 
proposed language, ``personal protective equipment to be provided for 
and used by employees'' because it believes that requirements for the 
provision and use of PPE are more appropriately addressed in 
Sec. 1915.152, General Requirements.
    The Shipbuilding Council of America (SCA) (Ex. 6-1) and NNS (Ex. 6-
2) stated that part 1926 (OSHA's construction industry standards) 
should not apply to employees of shipyards who perform construction 
work since one of the objectives of the rulemaking was to bring 
uniformity to the workplace by providing employees and employers with 
one set of safety standards to govern their work. SCA suggested that 
part 1926 apply only to construction work performed in shipyards by 
outside contractors (non-shipyard employees). OSHA believes, however, 
that it is inappropriate to distinguish between shipyard employees and 
contractor employees when setting requirements for worker protection. 
Therefore, OSHA is not making the suggested change.
    The Agency has consistently maintained that construction 
activities, such as the erection of building structures, are covered by 
the construction standards (29 CFR part 1926) and are not subject to 
the requirements of the shipyard standards (29 CFR part 1915). 
Furthermore, Sec. 1926.30, Shipbuilding and ship repairs, explicitly 
provides that shipyard employment is covered exclusively by the 
shipyard standards. Accordingly, the proposed paragraph (a)(1) language 
regarding the application for part 1926 in unnecessary and has been 
deleted.
    Proposed paragraph (a)(2) provided that subpart I of part 1910--
except Sec. 1910.134, Respiratory protection--would not apply to 
shipyard employment. Since OSHA has chosen to view respirators as a 
separate, full rulemaking [59 FR 58884 November 15, 1994] which will 
apply to shipyard employment as well as general industry, the final 
shipyard PPE standard will continue to reference existing Sec. 1910.134 
for respiratory PPE until the shipyard respirator rulemaking is 
complete. In all other respects, subpart I of part 1915 will be a self-
contained set of PPE standards for shipyard employment. It will not be

[[Page 26326]]

supplemented through reference to the General Industry standards.

Paragraph (b), Definitions

    Paragraph (b) defines the terms used in this standard.
    The proposed definitions paragraph did not include a number of 
terms and definitions that OSHA has used, or proposed to use, in other 
standards that address fall protection PPE [e.g., Powered Platforms for 
Building Maintenance 29 CFR 1910.66 (July 28, 1989 54 FR 31408); Fall 
Protection in Construction part 1926, subpart M (51 FR 42718, Aug. 9, 
1994); and General Industry PPE-Fall Protection, proposed 1910.128(b), 
subpart I (55 FR 13423 April 10, 1990)].
    The new terms and definitions included in paragraph (b) are: 
anchorage, connector, deceleration distance, equivalent, free fall, 
free-fall distance, lanyard, lifeline, lower levels, rope grab, and 
self-retracting lifeline/lanyard. Newly defined terms, revised terms, 
and proposed terms that elicited comments are discussed below. OSHA has 
determined that the inclusion of these definitions is appropriate for 
the purpose of clarity and to provide guidance consistent with that set 
in corresponding standards. In addition, as discussed further below, 
OSHA is adding a definition for the term ``qualified person.''
    The proposed term ``capable person'' will be replaced by the more 
familiar term ``qualified person'' in the final rule. SESAC also 
recommended using ``qualified person'' in the regulatory text (Tr. p. 
84-85, SESAC meeting, November 20, 1991).
    ``Deceleration device.'' This term describes equipment such as a 
rope grab, ripstitch lanyard, specially woven lanyard, tearing or 
deforming lanyard, and automatic self-retracting lifeline/lanyard, that 
serves to dissipate a substantial amount of energy during a fall arrest 
or otherwise limit the energy imposed on an employee during fall 
arrest. The proposed definition simply required that the device 
dissipate more energy than does a standard line or strap-webbing 
lanyard. After a careful review of the proposed definition, OSHA has 
revised the definition to indicate the extent to which a deceleration 
device must dissipate the energy imposed on an employee during fall 
arrest.
    ``Personal fall arrest system.'' This term means a system used to 
stop an employee's fall. The proposed definition, which was effectively 
identical, did not elicit comments.
    ``Positioning device system.'' This is a body belt or body harness 
system rigged so that an employee can work on an elevated, vertical 
working surface with both hands free while leaning. The proposed 
definition has been rewritten for clarity. OSHA did not receive any 
comments on the proposed definition.
    The proposed definition of ``strength factor'' has not been carried 
forward into the final rule because this term is not used in the final 
rule.

Section 1915.152  General Requirements

    Paragraph (a) of the final rule, Provision and use of equipment, 
requires that employers provide and ensure that employees use personal 
protective equipment for eyes, face, head, extremities, torso, and 
respiratory system, including such PPE as protective clothing, 
protective shields and barriers, personal fall protection equipment, 
and life saving equipment, whenever such PPE is necessary for employee 
protection. Except for some editorial changes, this provision is 
identical to that in the proposed rule.
    Paragraph (b) requires that employers assess the work activities in 
the shipyard to identify what hazards are present, or are likely to be 
present, which necessitate the use of PPE. OSHA is aware that many 
shipyard employers assess workplace hazards according to the trade or 
occupation of affected employees. The Agency believes that it is 
appropriate to allow employers flexibility in organizing their 
assessment efforts. Therefore, OSHA has added a note to the final rule 
which provides that a hazard assessment conducted according to the 
trade or occupation of affected employees will be considered to comply 
with paragraph (b), if the assessment addresses any PPE-related hazards 
to which employees are exposed in the course of their work activities.
    Where any such hazards are identified, the employer shall select 
the appropriate PPE for each affected employee (both in terms of type 
of PPE and fit), communicate selection decisions to affected employees, 
and document that the hazard assessment has been performed. After the 
assessment has been done, the standard does not expressly require the 
employer to review the hazard assessment on any periodic basis. 
However, it is the Agency's intent that hazard assessments be conducted 
at the intervals and on a schedule dictated by the risks in the 
workplace. For example, when there is a change in technology, 
production operations, or an occupation's task that has the potential 
to affect PPE-related hazards, the employer must review the 
appropriateness of the existing hazard assessment and the PPE being 
used and update the hazard assessment as necessary.
    In the proposal, this paragraph required that employers select PPE 
for their employees based on an assessment of workplace hazards. 
Commenters who responded to the July 6, 1994 notice (59 FR 3486) and 
participants at the January 25, 1995 public hearing stated that the 
term ``workplace'' that appeared in the requirement for hazard 
assessment in proposed section Sec. 1915.152(b) was not appropriate. 
They suggested that OSHA instead use the term ``trade'' or ``work 
activity.''
    For example, the South Tidewater Association of Ship Repairers, 
Inc. (Ex 9-3) recommended that OSHA change ``workplace to ``work 
activity'' or ``trade.'' Tampa Shipyards Incorporated (Ex. 9-8) stated:

    We would definitely agree that PPE used in general industry does 
not differ markedly from PPE used in the shipyards. We would point 
out the fact that work environment in shipyards is substantially and 
drastically different from general industry work environment. Most 
of the general industry work environment is a fixed work 
environment; manufacturing plant with assembly lines, consistent 
work processed, etc. The commercial shipyard work environment 
changes not only on a daily basis but sometimes on an hourly basis 
depending upon the size and configuration of a ship (or workplace) 
and the type of work to be accomplished on board that ship.

    The Shipbuilders Council of America (Ex. 9-7) stated:

    We believe that standards should be based on generic and uniform 
nature of the duties performed by specific categories of employees, 
rather than solely by the workplace * * * shipyard workplace that is 
neither fixed, nor constant, nor readily quantifiable like 
workplaces in all other industries.

    In addition, the Shipbuilders Council of America (Tr. pp. 8-9) 
testified that:

    The general industry standard is specifically targeted toward 
fixed facilities and processes, unlike commercial ship repair and 
ship building. Now the definition of workplace differs greatly from 
a manufacturing environment to a commercial ship repair facility. 
Workplace is used throughout the general industry PPE standard. By 
definition, workplace means, and I quote out of the Webster's 
dictionary, ``a place, shop or factory where work is done.''
    The commercial shipyard work environment changes not only on a 
daily basis * * * And from personal experience I can tell you it 
changes on an hourly basis and on a ship-to-shop basis which varies 
by size and configuration.

    OSHA acknowledges that shipyard employees--unlike general industry

[[Page 26327]]

employees--may work in several worksites during a shift. OSHA agrees 
with the commenters that the term ``workplace'' does not identify the 
appropriate source of PPE-related hazards in shipyards and believes 
that requiring hazard assessments by trade and related work activities 
effectively addresses the PPE-related risks in shipyards.
    The proposal also required employers to select PPE that would 
protect employees from the particular occupational hazards they were 
likely to encounter, to communicate their selection decisions to 
employees who would be obtaining their own PPE, and to have employees 
who obtain their own PPE follow the employers' selection decisions.
    The proposed rule assumed that some employees would be providing 
some of their own PPE. For that reason, OSHA specified, in the 
proposal, that employers would need to provide any such employees with 
PPE selection information and to make sure that their affected 
employees obtained the right PPE. This was intended to ensure that 
employees are properly protected by their PPE, regardless of who 
purchased it.
    Subsequently, the Agency determined that it was appropriate to 
provide additional guidance regarding when employers would be expected 
to pay for PPE and when employees would be expected to pay. On October 
18, 1994, OSHA issued a memorandum to its field offices which stated as 
follows:

    OSHA has interpreted its general PPE standard, as well as 
specific standards, to require employers to provide and to pay for 
personal protective equipment required by the company for the worker 
to do his or her job safely and in compliance with OSHA standards. 
Where equipment is very personal in nature and is usable by workers 
off the job, the matter of payment may be left to labor-management 
negotiations. Examples of PPE that would not normally be used away 
from the worksite include, but are not limited to: welding glasses, 
wire mesh gloves, respirators, hard hats, specialty glasses and 
goggles (designed for laser or ultraviolet radiation protection), 
specialty foot protection (such as metatarsal shoes and linemen's 
shoes with built in gaffs), face shields and rubber gloves, blankets 
and cover-ups and hot sticks and other live-line tools used by power 
generation workers. Examples of PPE that is personal in nature and 
often used away from the worksite include non-specialty safety 
glasses, safety shoes, and cold-weather outer wear of the type worn 
by construction workers. However, shoes or outer wear subject to 
contamination by carcinogens or other toxic or hazardous substances 
which cannot be safely worn off-site must be paid for by the 
employer. Failure of the employer to pay for PPE that is not 
personal and not used away from the job is a violation and shall be 
cited.

Although the equipment used in shipyard employment often differs from 
that mentioned in the October 18 memorandum, the same policy 
considerations apply in the Shipyard PPE context. Therefore, OSHA will 
apply the above-stated policy when determining who pays for the PPE 
required under Sec. 1915.152(a).
    In addition, the Agency has determined, after further 
consideration, that all affected employees need to be informed of PPE 
selection decisions in order to facilitate compliance with the 
standard. The proposed language that distinguishes between employees 
who pay for their own PPE and those who do not has been deleted and the 
provision has been revised accordingly. Paragraph (b) has also been 
editorially revised for clarity.
    In the proposal, paragraph (b) did not specifically address 
documentation of the hazard assessment. The recently revised PPE 
standard for General Industry (Sec. 1910.132(d)(2)), however, requires 
employers to verify through a written certification that a required 
hazard assessment has been performed. OSHA explained its decision (59 
FR 16336) to require such verification as follows:

    OSHA believes that some form of record is needed to provide OSHA 
compliance officers and affected employees with appropriate 
assurance that the required hazard assessment has been performed * * 
* It is not ``necessary for employers to prepare and retain a formal 
written hazard assessment.'' Given the performance-oriented nature 
of this rulemaking, OSHA has determined that the generation and 
review of extensive documentation would be unnecessarily burdensome.
    The Agency has found that a written certification is a 
reasonable means by which to establish accountability for 
compliance.
    Therefore, the Agency has determined that employers can 
adequately verify compliance with Sec. 1910.132(d) of the final rule 
through a written certification which identifies the workplace 
evaluated; the person certifying that the evaluation has been 
performed, the date(s) of the hazard assessment; and which 
identifies the document as a certification of hazard assessment.

    Taking into account the similarities between PPE used in General 
Industry and that used in Shipyard employment, OSHA reopened the 
Shipyard PPE rulemaking record (59 FR 34586, July 6, 1994) to provide 
public notice that the Agency was considering a requirement for 
shipyard employers to verify their compliance with the hazard 
assessment provision through a written certification. The notice of 
reopening solicited comments on the need for and impact of a 
certification requirement.
    The Preamble to the final rule for Fall Protection in Construction 
(part 1926, subpart M) (59 FR at 40721, August 9, 1994) underscored the 
flexibility employers have in complying with certification 
requirements, stating that a ``certification record can be prepared in 
any format an employer chooses, including reprinted forms, computer 
generated lists, or 3 x 5 cards.''
    Commenters to the shipyard PPE record (Exs. 9-3 and 9-7) stated 
that any requirement for the certification of hazard assessment should 
be focused on employee ``work activity'' or ``trade'' rather than on 
the ``workplace.'' For example, the South Tidewater Association of Ship 
Repairers (STASR)(Ex. 9-3) stated that ``[t]here is a constant 
transition of trades moving among various shops and vessels as well as 
a rotation of vessels. It is not feasible for designated shipyard 
employees to monitor continuously a ``workplace'' in constant change.'' 
In addition, STASR observed that it would be advantageous to identify 
``a universal requirement for trade-specific PPE as opposed to {a} 
site-specific requirement, peculiar to one location.'' The SCA (Ex. 9-
7) stated that shipyard work duties, unlike duties undertaken in a 
factory, are neither fixed, constant, nor readily quantifiable.
    Three other commenters (Exs. 9-6, 9-8 and 9-9) were particularly 
concerned that compliance with the certification requirement under 
consideration would necessitate continuous or repeated hazard 
assessment. These commenters, along with several others (Exs. 9-1, 9-4, 
9-5, 9-11 and 9-13), indicated that they have already implemented 
written programs to identify PPE needs, so that certifying performance 
of the hazard assessment would be redundant.
    In addition, commenters (Exs. 9-10 and 9-14) suggested that OSHA 
accept any form of documentation which provides the information needed 
to verify compliance. In particular, General Dynamics Electric Boat 
Division (EBDiv.) (Ex. 9-10) stated ``EBDiv. recommends that OSHA 
continue with its performance oriented approach and allow employers the 
flexibility in determining the most efficient and effective manner for 
documenting hazard assessments.''
    Based on the above-discussed comments, the notice of informal 
public meeting (59 FR 64173, December 13, 1994) solicited input 
regarding the means by which shipyard employers could adequately verify 
compliance with the requirement for hazard assessment. In particular, 
the notice stated that OSHA was ``considering the

[[Page 26328]]

extent to which current hazard assessments performed by trade or 
occupation provide the necessary information for selection of 
appropriate PPE'' and provided examples of trade-based formats (for 
welder and for yard maintenance worker) that the Agency might consider 
to be acceptable.
    In response, commenters (Exs. 11-2, 11-3, 11-6 and 11-8) stated 
that the shipyard industry already adequately documents its hazard 
assessment activities. NNS (Ex. 11-6) also expressed concern that the 
use of the term ``certify'' was unnecessary, stating that certification 
``does not contribute to improved safety and health. We suggest that 
certification should be replaced by a signature.'' In addition, NNS 
testified (Tr. 28-29, January 25, 1995), as follows:

    We still don't understand why the word ``certify'' can't be left 
behind in favor of the word ``document'' or ``signature'' or some 
other type of verbiage. We think that the word ``certify'' carries 
with it some connotations that will thwart, if you will, the 
employee involvement efforts that we're stepping forward trying to 
initiate.

    The SCA testified (Tr. 11-12) that:

    Where hazard assessment is already in place because of existing 
OSHA standards * * * we recommend that these assessments be allowed 
to meet the requirements of the portion of this standard.
    Where hazard assessment does not exist, and it would be hard for 
me to say where it doesn't in the shipyard industry, we'd recommend 
that an annual assessment be made of the affected craft, possibly of 
the machinery or pipefitting departments. Once the hazard assessment 
is conducted for these crafts, we recommend that the company safety 
representative be allowed to make these assessments and sign the 
assessment certifying his or her review and assessment. This 
assessment should be no more than listing the personal protective 
equipment required for that particular craft in all working 
circumstances.

    The UBC Health and Safety Fund of North America (Ex. 12-4) stated 
as follows: ``OSHA should require written certification of hazard 
assessment for employers to select the Personal Protective Equipment 
(PPE) that is necessary for work being performed by trades or 
occupations. This assessment should take into account the PPE necessary 
to protect employees performing specific work tasks.''
    OSHA has concluded that the documentation format described by 
commenters and meeting participants will provide adequate assurance 
that the required hazard assessment has been performed. The Agency 
agrees that a hazard assessment record which conveys the required 
information does not need to be called a ``certification.'' 
Accordingly, the Agency will use the term ``document'' rather than the 
term ``certification'' to describe these minimal written record 
required under final rule Sec. 1915.152(b)(4). Appendix A provides 
several acceptable ways of meeting the requirements, including some 
examples of the trade-based formats.
    Final rule paragraph (c) requires employers to ensure that 
defective or damaged PPE is not used. The proposed paragraph was 
essentially identical. This provision does not preclude the repair and 
reuse of PPE. OSHA recognizes that there are many situations where PPE 
can be removed from service, repaired, and then returned to service. 
There were no comments on the proposed paragraph, and OSHA therefore 
promulgates this provision as proposed, except for minor editorial 
changes.
    Final rule paragraph (d) requires that PPE that has been worn by 
workers and has become unsanitary be cleaned and disinfected before it 
is reissued. There were no comments on the proposed provision, and this 
paragraph is unchanged except for minor editorial changes.
    Final paragraph (e) sets the training requirements for users of 
PPE. OSHA has consistently maintained that employees must be properly 
trained in order to benefit from the use of PPE. The proposed part 1910 
and part 1915 PPE training provisions were identical, requiring simply 
that employees ``be trained in the proper use of their personal 
protective equipment.'' As discussed in the part 1910 subpart I final 
rule preamble (59 FR 16337-40, April 6, 1994), OSHA divided the 
training into four training elements: what affected employees must 
understand about their PPE; what PPE-related skills those employees 
must have; when affected employees would need retraining; and what 
documentation of training was needed.
    OSHA concluded that these training elements should also be 
considered for inclusion in the shipyard standard. Therefore, the July 
6, 1994, shipyard PPE notice discussed the general industry training 
provisions and solicited comments. In order to clarify the requirements 
for the shipyard industry and provide clear guidance for enforcement, 
the Agency has revised this provision (paragraph (e)(2)) to read: ``The 
employer shall ensure that each affected employee demonstrates the 
ability to use PPE properly before being allowed to perform work 
requiring the use of PPE.'' The Agency is not prescribing the means by 
which employers comply with this provision.
    The general industry PPE standard, Sec. 1910.132(f)(4), provides 
that: ``[t]he employer shall verify that each affected employee has 
received and understood the required training through a written 
certification that contains the name of each employee trained, the 
date(s) of training and that identifies the subject of the 
certification.''
    The comments received in response to the July 6 notice opposed a 
requirement for a written certification of compliance. For example, 
STASR (Ex. 9-3) commented that:

    Every shipyard in the Hampton Roads area has a safety program 
and a safety office. Every shipyard mandates usage of safety 
equipment for all employees. Those who do not comply are often sent 
home. STASR shipyards have safety programs with many of the PPE 
standards already in place. The PPE training and recordkeeping 
requirements are, in some cases, redundant.
    When an employee is hired and undergoes initial training, that 
employee can be given a list of equipment to wear while performing a 
specific task. This is far preferable to sending a monitor to 
evaluate a worksite on a continuous basis. The shipyard may then 
certify that an individual has been given the necessary training and 
the employee will certify understanding of the safety requirements 
for his or her trade.

    The SCA (Ex. 9-7) commented that:

    We support the general requirement for training as it does serve 
to enhance a safer working environment * * * we believe that 
training should be focused on trade specific duties of employees 
with the greatest emphasis being placed on orientation training at 
the outset. PPE serves a very useful purpose, and empirical data 
often establishes that causes of accident or occupational injuries 
are attributable to the fact that employees failed to comply with 
company PPE standards * * *. Additionally, documentation of all 
training should be in the form of training logs, which should be 
considered to be the equivalent of ``written certification'' in 
order to avoid the non value added redundance of record keeping.

    Tampa Shipyards Incorporated (Ex. 9-8) stated that:

    We are already complying with this proposed standard and we 
suspect many other shipyards are also complying with this standard.
    Verification through written certification should not be 
required if an employer can produce training logs with the 
employee's name, the date the training took place, type of training 
conducted and the name of the instructor. Training logs should be 
interpreted under this standard as ``written certification.''

    General Dynamics, Electric Boat Division (EBDiv) (Ex. 9-10) 
commented that:

    EBDiv agrees with OSHA that training is an essential element of 
a PPE program but does not agree that ``training'' as specified in 
the standard requires certification.

[[Page 26329]]

    EBDiv firmly believes training is a key and necessary component 
of safety and health programs. EBDiv provides extensive training to 
its employees on a variety of disciplines not mandated by OSHA in 
addition to training mandated by OSHA.

    Based on these comments, OSHA raised the issue of the need for 
documentation of training in the December 13, 1994, meeting notice (59 
FR 64173). AWH Corporation (Ex. 11-3) commented that training is 
provided when the employee is hired and at weekly ``gangbox'' safety 
meetings, and that training is periodically reinforced by including PPE 
as a topic at safety meetings.
    NNS responded (Ex. 11-6) that ``[t]he requirement to certify PPE 
training dictates recording specific information which can later be 
retrieved so as to prove training was conducted. We will provide 
samples of our existing system at the January 25 meeting.'' NNS 
provided copies of training documentation at the meeting (Ex. 12-2) and 
testified (Tr. 29-30) as follows:

    We've provided a recommended definition for the word 
``certify''* * *
    ``Certify'' means to evaluate subjectively, based on appearance 
and available information at that time. The certifying individual in 
a training session, for example, would verify that the trained 
individual was present during the stated training; he would ensure 
that required information was delivered to the target audience in 
what he believed to be an understandable fashion, and he would watch 
individuals perform activities which indicate that they have 
understood the training, and then use his judgment at that time to 
determine whether further instruction was needed or not.

    The SCA testified (Tr. 13-14, January 25, 1995) as follows:

    We would request that training certification requirements be met 
in the following manner. Number one, documented new hire orientation 
* * *. Secondly, we request that training certification requirements 
be met as documented annual refresher training.
    We'd recommend this documentation be in the form of training 
logs which many of us already keep on the computer * * *
    Some of our members suggest * * * giving a new employee a list 
of all required safety equipment that he or she should wear at the 
time they go through new-hire orientation, just as a reminder * * * 
this is already being done in many of our yards.

    In response to these submissions, OSHA emphasizes that any 
documentation of training that provides the specified information will 
provide adequate assurance that the training requirements have been 
satisfied. Therefore, Sec. 1915.152(e)(4) of the final rule requires 
employers to verify that each affected employee has received the 
required training with documentation that includes: employee(s) name; 
the date(s) of training, and type of training the employee received. In 
the case of an employee who has already been trained (either prior to 
the effective date of this standard or by another employer), OSHA will 
accept documentation dated as of the time the current employer 
determines that the employee has the requisite proficiency.
    As discussed above, the rulemaking record indicates that most 
shipyard employers are already documenting training in the form of a 
log, computer database, or some type of written document. Examples of 
acceptable documentation would be records of stand-up safety meetings 
and tool box meetings, or a tool room log (where an employee has 
checked out PPE such as safety glasses, hard hat, gloves, face shield). 
OSHA will accept any form of documentation that effectively 
communicates the required information.

Section 1915.153  Eye and Face Protection

    Final rule paragraph (a) sets out requirements for eye and face 
PPE. Paragraph (a)(1) requires employers to ensure that employees use 
eye and face PPE when employees are exposed to eye or face hazards from 
flying particles, molten metal, liquid chemicals, acid or caustic 
chemicals, chemical gases or vapors, or potentially injurious light 
radiation. This provision is based on the requirements in existing 
Sec. 1915.151 (b)(1) and (c)(1). This provision is essentially 
unchanged from that proposed. OSHA did not receive any comments on this 
provision.
    Final paragraph (a)(2) provides that front and side protection must 
be used when there is a hazard from flying objects. Detachable side 
protectors (for example clip-on or slide-on side shields) meeting the 
pertinent requirements of this section are acceptable.
    OSHA has determined that detachable side shields that meet the 
pertinent criteria (ANSI Z87.1-1989, as referenced by final rule 
Sec. 1915.153 (b)(1) and (b)(2)) will provide adequate protection from 
flying objects. Permitting detachable side shields will allow employers 
the flexibility to use this kind of protection when necessary, based on 
the working conditions at the employee's occupation or trade. The 
Agency has concluded that the same considerations that supported the 
adoption of such a requirement in other corresponding OSHA standards 
are relevant to shipyard employment.
    Employers should be aware that some PPE could create new hazards to 
employees. For example, allowing employees to wear wire-frame glasses 
(plano or prescription safety glasses) around energized electrical 
parts would increase the potential for electric shock.
    In the proposal, paragraph (a)(2) required that eye and face 
protective equipment properly fit employees. In the final rule 
Sec. 1915.152(b)(3) already requires that all PPE properly fit 
employees, and OSHA has therefore not included proposed paragraph 
(a)(2) in the final rule.
    Paragraph (a)(3) addresses appropriate eye PPE for employees who 
wear prescription lenses. This provision requires that employers 
provide each such employee either with eye protection that incorporates 
the prescription in its design or with PPE that can be worn over 
prescription lenses without disturbing the proper position of the 
lenses. The final provision, which is essentially the same as the 
proposed paragraph except for minor editorial changes, elicited no 
comments.
    Proposed paragraph (a)(3) required that protectors with tinted or 
variable tinted lenses not be worn when an employee was required in the 
course of work to pass from a brightly lit area, such as outdoors, into 
a dimly lit area, such as a vessel section. The Agency proposed this 
requirement to reduce the potential for extreme changes in lighting to 
temporarily impair an employee's vision.
    OSHA received four comments on this provision, all addressing the 
same point. The commenters (Exs. 6-5, 6-6, 6-9 and 6-10) opposed any 
prohibition on the use of tinted or variable tint lenses.
    Colonna's Shipyard, for example, stated that:

    The use of the terms ``well lighted'' and ``dimly lighted'' are 
vague. Tinted lenses, that primarily reduce glare, may not 
appreciably reduce the amount of light passing through the lenses. 
As technology improves, variable tint lenses have been shown to 
reduce the time it takes for the lenses to change from full shading 
to minimal shading. In fact, employees coming from an interior 
location into brilliant sunlight can be temporarily blinded by the 
sun's glare.

    In addition, two comments received on proposed subpart B of part 
1915 (Doc. S-505) (Ex. 6-15, Bay Shipbuilding Corp. (BSC) and Ex. 6-36, 
Peterson Builders, Inc. (PBI)), addressed this proposed provision. BSC 
stated that: ``Protectors with tinted or variable tint lenses should 
not be worn when an employee passes from a well lighted area into a 
dimly lighted area. Tinting over #2 shade is too dark, but #2 shade or 
under is felt to be acceptable and safe in most areas.''

[[Page 26330]]

    PBI stated that:

    We need the use of tinted lenses to protect our employees from 
stray ultraviolet rays from weld arc. We presently limit our 
employees to a 1.7 tint on safety glasses. We are also in favor of 
the use of the variable tint lenses. This standard is in 
contradiction to 1915.153A1, which requires us to protect employees 
from injurious light radiation. This has not been a problem for us 
in causing accidents.

    After evaluating the information in the record for this rulemaking 
(Doc. S-045), OSHA has concluded that the proposed requirement was too 
restrictive. The Agency has determined that the employer (for example, 
through the services of the company's safety professional) is in the 
best position to determine when tinted or variable tint lenses should 
be used, based on an awareness of working conditions. This approach is 
consistent with the current ANSI standard (ANSI Z87.1-1989, paragraph 
6.5.2), which is (as discussed below) being incorporated by reference 
in the final rule. Accordingly, proposed paragraph (a)(3) has not been 
retained in the final rule.
    Paragraph (a)(4) is essentially unchanged from the proposed 
paragraph. It requires employers to ensure that affected employees use 
equipment with filter lenses for protection against injurious light 
radiation and that the lenses have a shade number that is appropriate 
for the work being performed. Table I-1--Filter Lenses for Protection 
Against Radiant Energy--lists the necessary shade numbers for various 
operations. These provisions are consistent with other OSHA standards 
(existing Sec. 1915.151(c)(1) and Table I-1 in Sec. 1915.118).
    In addition, a note to this provision states that, when goggle 
lenses and a helmet lens are worn together, the shade value of the two 
lenses can be summed to satisfy the shade requirements of Table I-1, 
Sec. 1915.153. Bath Iron Works Corporation (BIWC) (Ex. 6-7) objected to 
this note, stating that the validity of the additive approach to filter 
lens selection has not been adequately demonstrated and violates 
accepted industry practice. OSHA disagrees with this view, because the 
technical experts responsible for the applicable consensus standard, 
ANSI Z87.1-1989, have indicated that the additive use of lenses is 
protective, provided that the combined values sum to the necessary 
value. Therefore, the note to Table I-1 has been retained.
    Paragraph (b) sets performance criteria for eye and face PPE. 
Paragraph (b)(1) provides that protective eye and face devices 
purchased after August 22, 1996 shall comply with ANSI Z87.1-1989, 
``American National Standard Practice for Occupational and Educational 
Eye and Face Protection,'' which is incorporated by reference, or shall 
be demonstrated by the employer to be equally effective. PPE which 
satisfies the criteria set by subsequent editions of the pertinent ANSI 
standard will be considered to comply with paragraph (b)(1) if the 
updated ANSI criteria are substantively unchanged or provide equivalent 
protection.
    In the proposal, this paragraph, which was designated paragraph 
(b)(1), required that the design of eye and face protection, in 
general, comply with the provisions of ANSI Z87.1-1979, while 
providing, in the alternative, that plano (non-prescription) spectacles 
comply with the performance-oriented criteria set out in proposed 
paragraph (b)(2). Shortly after the NPRM was issued, the 1979 edition 
of Z87.1 was superseded by the current 1989 edition. ANSI Z87.1-1989 is 
effectively identical to ANSI Z87.1-1979, except that the 1989 revision 
deleted design restrictive language that had limited the use of new 
technology in eye and face PPE. OSHA believes that performance-oriented 
regulatory language, such as that referenced from ANSI Z87.1-1989, will 
provide employers with appropriate flexibility to protect their 
employees while taking the particular circumstances of their workplaces 
into account. The Agency further believes that allowing employees to 
rely on the 1989 edition will facilitate compliance with the final 
rule, but will not prevent employers from using PPE that would have 
been allowed under proposed paragraph (b)(1).
    Final rule paragraph (b)(2) requires that eye and face PPE 
purchased before August 22, 1996 comply with ANSI Z87.1-1979 or be 
demonstrated by the employer to be equally effective. OSHA has 
determined that it is appropriate to allow the continued use of such 
PPE in order to avoid imposing unreasonable burdens on employers. As 
noted above, the substantive provisions of the 1979 and 1989 editions 
are effectively identical, so employee safety would not be furthered by 
requiring that employers remove PPE tested under ANSI Z87.1-1979 from 
service. In this way existing stocks of PPE can be depleted, and any 
replacement PPE must satisfy the criteria referenced in ANSI Z87.1-
1989.
    Proposed paragraph (b)(2) would have set performance-oriented 
criteria for plano spectacles, addressing impact protection, optical 
requirements, flammability resistance and radiant energy protection. 
This paragraph was included in the proposal because OSHA had determined 
that the design provisions (such as for minimum lens thickness or frame 
design) of the consensus standard referenced by existing 
Sec. 1915.151(a)(1) (ANSI Z2.1-1959) were outdated. The removal of the 
design restrictive language from ANSI Z87.1 when it was revised in 1989 
eliminated the need to address this problem in the final rule. 
Accordingly, no such provision appears in the final rule.

Section 1915.154  Respiratory Protection

    Final rule Sec. 1915.154 incorporates existing Sec. 1910.134, 
Respiratory protection, by reference, as was proposed. The shipyard 
industry has been complying for years with Sec. 1910.134 with regard to 
its respiratory protection programs. The two comments received on 
proposed Sec. 1915.154 (Exs. 6-1 and 6-2) agreed with OSHA's proposal 
to replace Sec. 1915.152, the existing shipyard respirator standard, 
with Sec. 1910.134. Both comments expressed the belief that 
Sec. 1910.134 is more protective and certainly more current than 
Sec. 1915.152.
    OSHA has published a proposed revision of Sec. 1910.134, 
Respiratory Protection, which covers general industry, construction and 
shipyard employment (59 FR 58884, Nov. 15, 1994). When the revised 
respiratory protection standard becomes a final rule, OSHA will apply 
that rule to shipyard employment.

Section 1915.155  Head Protection

    Final rule paragraph (a) addresses the use of protective helmets. 
Paragraph (a)(1) requires employers to ensure that affected employees 
wear protective helmets when they are working in areas where there is a 
potential for head injury from falling objects. This requirement is 
essentially the same as current Sec. 1915.153(a). The national 
consensus standard for protective headgear, ANSI Z89.1, referenced in 
final rule Sec. 1915.155(b), deals only with the head injury hazards 
posed by falling objects and high-voltage electric shock and burn. 
Therefore, this section of the final rule addresses PPE that is used to 
protect the head from these hazards.
    The proposed rule addressed the use of protective helmets where 
there was potential for injury to the head from falling or moving 
objects. The duty to protect employees from other hazards to the head, 
such as moving objects, may be invoked through the general requirements 
of final rule Sec. 1915.152(a) when such hazards are identified by the 
hazard assessment.

[[Page 26331]]

    Commenting on proposed subpart B of part 1915 (Doc. S-050, Ex. 6-15 
of Docket #S-050), BSC stated: ``The standard should reflect what is 
stated in the ANSI standard for head protection.'' As noted above, the 
ANSI standard addresses falling object, not moving object, hazards and 
proposed paragraph (a)(1) has been revised accordingly.
    Paragraph (a)(2) requires that affected employees wear protective 
helmets designed to reduce electric shock hazards when working in areas 
containing potential electrical hazards or energized conductors. This 
provision is essentially identical to the proposed provision and to 
other corresponding OSHA standards.
    Final rule paragraph (b) sets the performance criteria for 
protective helmets. This paragraph provides that protective helmets 
purchased after August 22, 1996 shall comply with ANSI Z89.1-1986, 
``Personnel Protection--Protective Headwear for Industrial Workers--
Requirements,'' which has been incorporated by reference, or shall be 
demonstrated by the employer to be equally protective. PPE which 
satisfies the criteria set by subsequent editions of the pertinent ANSI 
standard will be considered to comply with paragraph (b) if the updated 
ANSI criteria are substantively unchanged or provide equivalent 
protection. The Agency believes that this performance-oriented approach 
will encourage innovation and the use of improved equipment. The 
proposed rule also referenced the 1986 edition of ANSI Z89.1.
    The consensus standard (ANSI Z.2-1959) referenced by the existing 
rule (Sec. 1915.153(a)) has been superseded several times since the 
existing standards were adopted. OSHA does not expect that much, if 
any, head PPE which was produced to meet the 1959 requirements is still 
in use. Furthermore, the Agency has concluded that ANSI Z.2-1959 does 
not provide adequate guidance regarding the selection of appropriate 
head protection. Therefore, unlike final rule Sec. 1915.153, this 
section does not explicitly ``grandfather'' PPE which complies with the 
existing rule. Employers can continue to have their employees use head 
PPE which was produced to comply with a pre-1986 edition of ANSI Z89.1 
if the employer establishes that the equipment either satisfies the 
performance criteria of ANSI Z89.1-1986 or provides equivalent 
protection.
    The 1969 and 1986 editions of ANSI Z89.1 set essentially the same 
requirements, except with regard to electric insulation for Class B 
helmets. The Agency has concluded that Class B helmets already in use 
which satisfied the criteria set by the 1969 edition would also satisfy 
the 1986 criteria. Accordingly, final rule paragraph (b)(2) allows 
employers to continue to use protective helmets purchased before the 
effective date of the standard being published today provided that such 
helmets meet the criteria of ANSI Z.89.1-1969. This means that 
employers will not be required to replace protective helmets currently 
in use if they meet these criteria.

Section 1915.156  Foot Protection

    Final paragraph (a) requires that affected employees wear 
protective footwear when they are exposed to hazards from falling and 
rolling objects, electrical hazards, and objects that may pierce a shoe 
sole. This is consistent with requirements in other corresponding OSHA 
standards. This language, which is effectively identical to that in the 
proposal, differs from existing Sec. 1915.153(d), which requires 
employers only to make safety shoes available and ``encourage'' their 
use. OSHA believes that requiring employers to have affected employees 
wear protective footwear is necessary to protect their feet from the 
risk of serious injury. The AWSC (Ex. 6-4) commented that it would 
impose a cost burden on employers if they were required to purchase 
safety shoes for their employees. Therefore, they recommended that OSHA 
not require the employer to pay for foot protection, stating as 
follows:

    The current regulatory language concerning foot protection of 
employees requires the employer to encourage the use of and make 
available appropriate foot protection. The new language states that 
the employer ``shall ensure that employees wear protective 
footwear.'' AWSC does not object to the practice of wearing the 
correct protective footwear, and supports the use of this type of 
personal protective equipment. However, the new language indicates a 
dramatic shift from current shipyard operations.
    Shipyard facilities have instituted many different policies to 
provide protective footwear to the employee, including disallowing 
employees to work at the facility unless they are wearing the 
appropriate footwear and providing an allowance to purchase the 
footwear. Lists of available and appropriate suppliers are 
circulated to the employees as a guide.

    OSHA also received a comment on this subject from PBI (Docket S-
050, Ex. 6-36) that stated: ``This requirement is going to be cost 
prohibitive. We presently recommend safety shoes and contribute to 
their purchase. However, this standard would practically make them 
mandatory throughout the shipyard. Our injury experience does not 
indicate a need for mandatory safety shoes.''
    As discussed above in reference to the provision for hazard 
assessment, subpart I requires employers to identify the hazards to 
which their employees may be exposed and have those employees equipped 
accordingly
FR Doc. 96-12573 Personal Protective Equipment for Shipyard Employment (PPE)
. Therefore, employees would be required to wear protective 
footwear only when such protection was appropriate. In addition, as 
discussed above in reference to OSHA's 1994 Memorandum on PPE, OSHA 
interprets the part 1915 subpart I requirements for employers to 
provide PPE to mean that employers pay for PPE required by the company 
for the worker to do his or her job safely and in compliance with OSHA 
standards. The above discussed policy memorandum specifically indicates 
that employers should expect to pay for specialty foot protection. On 
the other hand, OSHA policy also provides that payment for PPE which is 
personal in nature and useable away from the workplace (such as safety 
shoes) is left to labor-management negotiations.
    Final rule paragraph (b) sets the performance criteria for 
protective footwear. Paragraph (b)(1) provides that protective footwear 
purchased after August 22, 1996 shall comply with ANSI Z41-1991, 
``American National Standard for Personal Protection-Protective 
Footwear,'' or shall be demonstrated by the employer to be equally 
protective.
    In addition, paragraph (b)(2) allows protective footwear purchased 
before August 22, 1996 to continue to comply with ANSI Z41-1983, 
Personal Protection-Protective Footwear, or footwear that the employer 
can demonstrate to be equally protective. PPE which satisfies the 
criteria set by subsequent editions of the pertinent ANSI standard will 
be considered to comply with paragraph (b) if the updated ANSI criteria 
are substantively unchanged or provide equivalent protection. The 
Agency believes that this performance-oriented approach will encourage 
innovation and the use of improved equipment. Proposed paragraph (b) 
referenced the 1983 edition of ANSI Z41 for all protective footwear.
    The 1991 edition of ANSI Z41, which has superseded the 1983 
edition, imposes essentially the same requirements as the 1983 edition, 
except that the 1991 edition provides more specific performance 
requirements for resistance to compressive forces and standardizes the 
puncture resistance testing methods. OSHA believes that referencing 
ANSI Z41-1991 for shoes

[[Page 26332]]

purchased after August 22, 1996 provides appropriate and up-to-date 
criteria for employers and employees seeking to buy protective 
footwear.
    OSHA has determined that it is appropriate to provide explicitly 
for the continued use of foot PPE purchased prior to the effective date 
of the final rule, as long as it complies with the pertinent provisions 
of the ANSI standard (ANSI Z41-1983) referenced by the proposed rule. 
In this way, the Agency avoids imposing unreasonable burdens on 
employers.

Section 1915.157  Hand and Body Protection

    Final rule Sec. 1915.157 addresses hand and body PPE. Paragraph (a) 
requires employers to ensure that affected employees use appropriate 
PPE when their hands or other parts of their bodies are exposed to 
hazards that could lead to injuries. The final rule identifies skin 
absorption of harmful substances, severe cuts or lacerations, severe 
abrasions, punctures, chemical burns, thermal burns, harmful 
temperature extremes, and sharp objects as examples of hazards that 
would require the use of PPE. The proposed provision was essentially 
identical to that in the final rule, except that it identified the 
hazards requiring protection in more general terms.
    Final rule paragraph (b) requires employers to ensure that no 
employee wears clothing impregnated or covered in part with flammable 
or combustible materials (such as grease or oil) while engaged in hot 
work operations or working near an ignition source. This requirement is 
necessary to protect workers in hot work operations from fire hazards.
    The proposed rule stated that employees shall not wear greasy 
clothing when performing hot work operations. Existing Sec. 1915.153(e) 
provides that employees shall not be permitted to wear ``excessively 
greasy'' clothing while performing hot work operations.
    The AWSC recommended (Ex. 6-4) that the word ``excessively'' be 
retained in the regulatory text of the final rule.

    Shipyard work by definition is not a clean activity. Employees' 
clothing will be dirty. However, the clothing may not be ``greasy'' 
or even excessively greasy. Deletion of the descriptive term 
``excessively'' will create rather than diminish compliance 
problems. We do not advocate that employees wear excessively greasy 
clothes when performing hot work operations, but without a proper 
explanation by OSHA as to the rationale for deleting the term, we 
advocate retention of the word ``excessively'' in the proposed 
language.

    In addition, BSC commented (Ex. 6-15 in Docket S-050) that the 
language of the proposed paragraph was unclear. BSC suggested that OSHA 
revise the proposed language to require that employees ``not wear 
clothing impregnated with flammable or combustible materials when 
performing hot work operations.''
    OSHA believes that retention of the term ``excessively,'' as 
suggested by the AWSC, could potentially complicate compliance because 
the Agency has not established a measurable, objective standard for 
determining what is excessive. Moreover, the risk of flammability 
exists when clothing is impregnated, or covered, even impart, with a 
flammable or combustible substance. Therefore, the Agency has concluded 
that it is appropriate to prohibit employees from wearing clothing 
impregnated or covered with a flammable or combustible substance during 
hot work operations. The Agency agrees with the BSC that the standard 
needs to address all flammable and combustible materials, not just 
grease, and that adding the term ``impregnated'' (in the sense of 
permeated, imbued, or saturated) will more clearly express OSHA's 
intent. The provision has been revised accordingly.
    Final rule paragraph (c) requires that the employer have employees 
wear protective electrical insulating gloves and sleeves, or other 
rubber protective equipment that provides equivalent protection when 
the employees are exposed to electrical shock hazards while working on 
electrical equipment. The proposed rule was effectively identical, 
except that it did not provide for the use of ``other electrical 
protective equipment.'' The Agency has determined that the addition of 
this performance-oriented revision will encourage innovation and 
facilitate compliance.

Section 1915.158  Lifesaving Equipment

    This section sets requirements for lifesaving equipment used in 
shipyard employment. Some of the language in the final rule has been 
editorially revised to reflect the language used in the U.S. Coast 
Guard's standard for approved lifesaving equipment (46 CFR part 160). 
OSHA's existing Sec. 1915.154(a) specifies that the above-cited U.S. 
Coast Guard requirements for this equipment shall be followed. The OSHA 
final rule provides clarification of acceptable personal flotation 
devices and uses terminology that is consistent with current Coast 
Guard requirements. Also, for Type IV PFDs, the U.S. Coast Guard 
regulations use the term ``ring life buoys'' rather than the term 
``life rings'' as proposed by OSHA. Therefore, OSHA has replaced ``life 
rings'' with ``ring life buoy'' wherever the term appeared in the 
proposal. The proposed language did not elicit any comments.
    Final rule paragraph (a)(1) requires that personal flotation 
devices (PFDs) worn by employees be approved by the U.S. Coast Guard as 
a Type I PFD, Type II PFD, Type III PFD, or Type V PFD, unless the 
employer provides employee worn equipment that is as effective as the 
types listed (e.g., a Coast Guard approved immersion suit). Any PFD 
which is U.S. Coast Guard approved and marked as a Type I PFD, Type II 
PFD or Type III PFD is acceptable to OSHA for use by employees. A Type 
V PFD, including Type V Hybrid PFDs, is acceptable to OSHA for use by 
employees if it is U.S. Coast Guard approved and marked for use as a 
work vest, for commercial use, or for use on vessels. The language of 
the proposed paragraph, which was based on existing Sec. 1915.154(a), 
has been editorially revised and clarified in the final rule.
    Final rule paragraph (a)(2), addressing the inspection of PFD's, 
was proposed by the Agency for deletion with the intent of covering 
defective PFD equipment under revised general requirements 
Sec. 1915.152(c), ``Defective and damaged equipment.'' After further 
consideration the Agency has concluded that a PFD is critical 
lifesaving equipment which requires specific inspection prior to each 
use for dry rot, chemical damage, or other defects (such as tears, 
punctures, missing or non- functioning components) which affect their 
strength and buoyancy. Therefore, the language of existing 
Sec. 1915.154(b) is being retained in the final rule.
    Paragraph (b) establishes requirements for ring life buoys and 
ladders. Paragraph (b)(1) requires that at least three 30-inch (0.78 m) 
U.S. Coast Guard approved ring life buoys with lines attached be kept 
in readily visible and accessible places when working on a floating 
vessel of 200 or more feet (61 meters). Ring life buoys must be located 
one forward, one aft, and one at the access to the gangway. Locating 
ring life buoys at these positions ensures that one will be readily 
available if a worker falls overboard at any point along the ship's 
length. This paragraph, which is based on existing Sec. 1915.154(c)(1), 
is essentially identical to the proposed paragraph.
    Paragraph (b)(2) requires floating vessels under 200 feet (61 m) in 
length to have at least one 30-inch (0.78 m) U.S. Coast Guard approved 
ring life buoy with line attached located at the gangway. The proposed 
paragraph,

[[Page 26333]]

based on existing Sec. 1915.154(c)(1), was essentially the same.
    Paragraph (b)(3) requires that at least one 30-inch (0.78 m) U. S. 
Coast Guard approved ring life buoy with a line attached be located on 
each staging float alongside the floating vessels from which work is 
being performed. The proposed paragraph, which was based on existing 
Sec. 1915.154(c)(2), is effectively identical to the final rule's 
provision.
    Paragraph (b)(4) requires at least 90 feet (27 m) of line to be 
attached to each ring life buoy. The proposed requirement, which was 
based on existing Sec. 1915.154(c)(3), was effectively identical to the 
final rule.
    Paragraph (b)(5) requires that at least one portable or permanently 
installed ladder be in the vicinity of each floating vessel on which 
work is being performed. The provision further requires that the 
ladder(s) be of sufficient length to assist employees to reach safety 
in the event that they fall into the water. The proposed paragraph, 
which was based on existing Sec. 1915.154(c)(4), was effectively 
identical to the final rule.

Section 1915.159  Personal Fall Arrest Systems

    This section sets performance criteria and other requirements for 
the use of personal fall arrest systems.
    The Agency has determined that the fall hazards encountered by 
shipyard employees correspond to those faced by employees in other 
industries, and that it is therefore appropriate for OSHA to consider 
the information generated in general industry fall protection PPE 
rulemakings when drafting the final rule for shipyard PPE. The fall 
protection PPE criteria in proposed Sec. 1915.159 were very similar to 
those in the corresponding proposed general industry standard (proposed 
Secs. 1910.128 and 1910.129).
    The record for the general industry fall protection PPE rulemaking 
(Docket S-057) indicated that the Agency should consider revising the 
proposed rule to prohibit the use of non-locking snaphooks and to 
disallow the use of body belts in personal fall arrest systems. This 
record, in turn, is directly relevant as the Agency considers 
corresponding changes in proposed Sec. 1915.159.
    To provide the public with notice and an opportunity to comment on 
the need for such revisions to the shipyard PPE proposed rule, the 
Agency solicited input through the July 6, 1994 notice of reopening (59 
FR 34586) and the December 13, 1994 meeting notice (59 FR 64173). The 
response to those notices is discussed below.
    OSHA obtained evidence (Docket S-057) in the General Industry 
rulemaking that employees who fall while wearing body belts are not 
protected as well as they would be if the fall occurred while the 
employee was wearing a body harness, and that the use of body belts has 
resulted in injuries to falling employees. A large number of rulemaking 
participants (Exs. 9-9, 9-10, 11-7, Tr. p. 23, Tr. pp. 59-61) supported 
prohibiting the use of body belts in fall protection systems. For 
example, Atlantic Marine (Ex. 9-9) endorsed the use of body harnesses 
as a safer method for employees, stating: ``While the cost of body 
harnesses is usually twice the amount of the body belts, the added 
safety factor to the employee is well worth the money, and in the long 
run, will save the company money in case of an accident.''
    General Dynamics, Electric Boat Division, (Ex. 9-10) stated that it 
utilizes body harnesses for all of its fall protection needs.
    Bath Iron Works Corporation/Local S6 (BIWC/Local S6) (Ex. 11-7) 
commented that they use only body harnesses in fall arrest systems and 
use either body harnesses or body belts in positioning device systems. 
BIW/Local S6 stated that it ``fully supports the implementation of the 
proposed changes to [part 1915] subpart I.''
    The SCA testified (Tr. 23) that its members support the use of body 
harnesses in personal fall arrest systems, stating ``many of our yards 
already use them. We find them to be very effective, and everybody 
seems to certainly feel a lot safer with them.''
    In addition, the Engineering and Safety Service (E&S) testified 
(Tr. 59-61) that ``body belts have no useful purpose in a personal fall 
arrest system. E&S believes that an effective personal fall arrest 
system must incorporate a full body harness to protect the worker from 
injury and to provide an opportunity for rescue.''
    However, NNS (Ex. 9-11) responded as follows:

    We reviewed all falls occurring at NNS since January 1, 1991. 
None of those occurring involved an injury which could have been 
prevented or mitigated by using a harness over a belt. NNS mostly 
uses belts with double acting clips. To replace all of our body 
belts with harnesses would cost in excess of $570,000. Clearly, this 
is another unwarranted cost adversely affecting our global 
competitiveness without enhancing the safety of our employees.

    The December 13, 1994 notice (59 FR 64173) solicited input 
regarding the extent to which a phased in ban on the use of body belts 
in personal fall arrest systems would be appropriate for shipyard 
employment.
    In their comments to this notice, NNS stated as follows:

    We now understand that OSHA will agree to a phased replacement 
of body belts to offset the initial cost of purchasing large 
quantities of body harnesses. We will provide life cycle and 
replacement information at the January 25 meeting which should help 
OSHA to determine what the phased replacement period should be.

    NNS subsequently testified (Tr. 34-35):

    We see body harnesses coming, and we need a significant period 
of phase-in time for this to have a minimal financial impact on our 
operations. We've got 4,000 some-odd body belts either on issue or 
available for issue. Replacing all of those at once would cost use 
some $570,000 * * * [W]e'd like a reasonable period of time to phase 
the harnesses in, and that reasonable period of time, based on our 
inventory and our estimated useful life of a body belt, is seven 
years.

    Based on the information in Docket S-057 and the shipyard industry 
input discussed above, OSHA has decided to bar the use of body belts in 
personal fall arrest systems. OSHA believes, however, that it is 
appropriate to allow a phase-out period, ending December 31, 1997, 
rather than to establish an immediate prohibition, so that shipyard 
employers can continue to use their body belts while they switch over 
to body harnesses. OSHA urges employers to phase out the use of body 
belts in personal fall arrest systems as soon as possible so that 
employees may be spared exposure to the increased risk of injuries from 
body belt use. It is important to note that body belts may continue to 
be used in positioning device systems even after they have been banned 
in fall arrest systems. OSHA has included paragraphs (b)(6)(i), 
(c)(1)(i), (c)(2), (c)(3), and (c)(8) in the final rule to provide 
criteria for any body belts that are used in personal fall arrest 
systems during the phase-out period.
    In addition, OSHA has determined that it is appropriate, given the 
dangers related to ``roll-out,'' to phase-out the use of non-locking 
connectors. The phase-out period will avoid imposing undue hardship on 
employers who currently use non-locking snaphooks. As discussed in the 
July 6, 1994 notice of reopening, the Agency has concluded that the 
same considerations which supported the adoption of such a requirement 
in other corresponding OSHA PPE standards apply to personal fall arrest 
system components used in shipyard employment. OSHA has

[[Page 26334]]

concluded that compliance with final rule paragraphs (a)(5) and (a)(6) 
will effectively minimize any problems related to the use of non-
locking snaphooks during the phase-out period.
    The input received in response to the July 6, 1994 reopening notice 
(59 FR 345860) and the December 13, 1994 meeting notice (59 FR 64173) 
indicated shipyard industry support for a ban on the use of non-locking 
snaphooks. For example, General Dynamics, Electric Boat Division (Ex. 
9-10) stated that it ``utilizes locking snaphooks and therefore takes 
no issue with the proposed * * * language.''
    NNS (Tr. 52) and the UBC Health and Safety Fund of North America 
(UBC) (Tr. 86) testified that OSHA should require the use of locking 
snaphooks. In particular, the UBC stated that ``OSHA should prohibit 
the use of non-locking snap hooks because of the recognized danger of 
roll-out and the resulting possibility of employee falls.'' 
Accordingly, Sec. 1915.159 of the final rule bans the use of non-
locking snaphooks in fall arrest systems, effective January 1, 1998.
    Final rule paragraph (a) sets criteria for connectors and 
anchorages used in personal fall arrest systems. Except where otherwise 
indicated, any final rule provisions which were not proposed have been 
added to the standard because the Agency has concluded that the same 
considerations which supported the adoption of such requirements in 
other corresponding PPE standards apply to personal fall arrest systems 
and components used in shipyard employment.
    Paragraph (a)(1), proposed as paragraph (a)(7), requires that 
connectors be made of drop forged, pressed, or formed steel or 
materials equivalent in strength. The connectors used in personal fall 
arrest systems must be made of steel or equivalent materials to 
withstand failure under fall conditions. As discussed above in relation 
to the definitions (Sec. 1915.151(b)), OSHA has replaced the proposed 
term ``hardware'' with the term ``connector.'' Otherwise, the proposed 
and final rule language are identical.
    Final rule paragraph (a)(2), proposed as paragraph (a)(8), requires 
that connectors have a corrosion-resistant finish and that all surfaces 
and edges be smooth to prevent damage to the interfacing parts of the 
system. The only difference between the final rule's provision and the 
proposed provision is the use of the term ``connector'' instead of 
``hardware.''
    Final rule paragraph (a)(3), proposed as paragraph (a)(14), 
requires that D-rings and snaphooks used in these systems be capable of 
sustaining a minimum tensile load of 5,000 pounds (22.2 kN). No 
comments were received on this paragraph.
    Final rule paragraph (a)(4), which is also a new provision, 
requires that D-rings and snaphooks be 100 percent proof tested to a 
minimum tensile load of 3,600 pounds (16 Kn) without cracking, 
breaking, or being permanently deformed. The provision is included to 
ensure the strength of all D-rings and snaphooks.
    Paragraph (a)(5), which was not proposed, provides that snaphooks 
shall either be sized so as to prevent unintentional disengagement of 
the snaphook or shall be of a locking type which is designed and used 
to prevent disengagement of the snaphook. This provision has been added 
to prevent ``rollout'' conditions in a personal fall arrest system 
during the phase-out period for non-locking snaphooks.
    Final rule paragraph (a)(6) requires that snaphooks, unless of a 
locking type designed and used to prevent disengagement from the 
following connections, must not be attached:
    (i) Directly to webbing, rope, or wire rope;
    (ii) To each other;
    (iii) To a D-ring to which another snaphook or other connector is 
attached;
    (iv) To a horizontal lifeline, or
    (v) To any other object that is shaped incompatibly or dimensioned 
in relation to the snaphook such that the connected object could 
depress the snaphook keeper a sufficient amount for release.

Proposed paragraphs (a)(15), (a)(16), and (a)(17), which set similar 
requirements, have been clarified and consolidated in final rule 
paragraph (a)(6).
    Final rule paragraph (a)(7), which is a new provision, requires 
that devices used for connection to the horizontal lifeline on 
suspended scaffolds, or to similar work platforms with horizontal 
lifelines that may become vertical lifelines, be capable of locking in 
any direction on the lifeline. Because a suspended scaffold or platform 
could lose its support at either end, the connection device must be 
able to lock on the lifeline regardless of which end goes down.
    Final rule paragraph (a)(8), requires that anchorages used for the 
attachment of personal fall arrest equipment be independent of any 
anchorage being used to support or suspend platforms. Final rule 
paragraph (a)(9) requires that anchorages either be capable of 
supporting at least 5,000 pounds (22.2 Kn) per employee attached or be 
designed, installed, and used as part of a complete personal fall 
arrest system that maintains a safety factor of at least two, and is 
used under the direction and supervision of a qualified person. Both 
provisions are based on proposed paragraph (a)(10).
    Proposed paragraph (a)(10) required that personal fall arrest 
systems be secured to an anchorage capable of supporting at least twice 
the potential impact load of an employee's fall. E&S testified (Tr. 63-
64) that it was ``concerned about the safety factor requirements for an 
anchorage in the proposed standard * * * [E&S] does not believe the 
average worker is capable of determining the safe limits of an 
anchorage.'' In the course of subsequent questioning (Tr. 70-71), E&S 
agreed that anchorages installed as part of a completely designed 
personal fall arrest system, and used under the supervision of a 
qualified person, would provide adequate support for employees. This 
approach, taken in the corresponding construction and general industry 
rulemakings, has been adopted in the shipyard PPE final rule. The final 
rule provisions, while reformatted for the sake of clarity, are 
essentially the same as the proposed provision.
    Final rule paragraph (b) sets criteria for lifelines, lanyards, and 
personal fall arrest systems. Paragraph (b)(1) requires that each 
employee be provided with a separate lifeline when vertical lifelines 
are used. Proposed paragraph (a)(9), which elicited no comments, was 
essentially identical to this provision of the final rule.
    Final rule paragraph (b)(2) requires vertical lifelines (droplines) 
and lanyards to have a minimum breaking strength of 5,000 pounds (22.2 
Kn). This provision of the final rule consolidates the strength 
requirements contained in proposed paragraphs (a)(11) and (a)(13). The 
elements of proposed paragraph (a)(11), which addressed self-retracting 
lifelines, have been redesignated final rule paragraphs (b)(3) and 
(b)(4), as discussed below. The ``exception'' to the 5000-pound 
strength requirements contained in proposed paragraph (a)(13) appears 
in the final rule as a separate provision, paragraph (b)(3), to more 
clearly express the Agency's intent. OSHA received no comments on the 
proposed paragraphs relating to lifelines, lanyards, and personal fall 
arrest systems. The Agency has determined that reformatting the 
proposed requirements will facilitate compliance efforts for employers 
whose employees use vertical lifelines or lanyards.
    Final rule paragraph (b)(3) requires that self-retracting lifelines 
and lanyards which automatically limit free fall to 2

[[Page 26335]]

feet (0.61 m) or less be capable of sustaining a minimum static tensile 
load of 3,000 pounds (13.3 Kn) applied to the device with the lifeline 
or lanyard in the fully extended position. Final rule paragraph (b)(4) 
requires that self-retracting lifelines and lanyards which do not limit 
free fall distances to 2 feet (0.61 m) or less (for example: ripstitch 
lanyards, tearing, and deforming lanyards) be capable of sustaining a 
minimum tensile load of 5,000 pounds (22.2 Kn) applied to the device 
(with the lifeline or lanyard in the fully extended position if such a 
condition can occur in use). As discussed above, final rule paragraphs 
(b)(3) and (b)(4), which are based on proposed paragraph (a)(11), have 
been included in the final rule as separate paragraphs for clarity.
    Final rule paragraph (b)(5) (revised from proposed paragraph 
(a)(12)) requires that horizontal lifelines to be used as part of a 
complete personal fall arrest system be designed and installed under 
the supervision of a qualified person and have a safety factor of at 
least two. The proposed provision required that horizontal lifelines 
have sufficient strength to support a fall impact force of at least 
5,000 pounds (22.2 Kn). As discussed above, the Agency has concluded 
that the same considerations which supported the adoption of such a 
requirement in the other corresponding OSHA standards apply to personal 
fall arrest system components used in shipyard employment. OSHA has 
revised the final rule accordingly.
    Final rule paragraph (b)(6) sets the systems performance criteria 
for personal fall arrest systems. These are new requirements, so OSHA 
is making this provision effective November 20, 1996 in order to allow 
employers a reasonable amount of time to attain compliance. The note to 
final rule paragraph (b)(6) indicates that Non-mandatory Appendix B 
provides examples of criteria and protocols for designing and testing 
personal fall arrest systems that OSHA would consider to comply with 
the standard.
    Proposed paragraph (a)(4) was similar to final rule paragraph 
(b)(6), except that the proposed rule set 1,800 pounds (rather than 900 
pounds) as the maximum arresting force limit for systems that used body 
belts and required that a system have a strength factor of two (based 
on a design weight of 250 pounds per employee). Also, as discussed 
below, the proposed requirement that free fall be limited to six feet 
has been redesignated as a separate provision, final rule paragraph 
(b)(7), for the sake of clarity. The note to proposed paragraph 
(a)(4)(iv) is essentially identical to that which appears in the final 
rule, except for editorial revisions. As discussed above, in reference 
to the July 6, 1994 notice (59 FR 34586), the Agency has concluded that 
the same considerations which supported the adoption of such 
requirements in the other corresponding OSHA standards apply to 
personal fall arrest system components used in shipyard employment. 
OSHA has revised the proposed rule accordingly.
    Final rule paragraph (b)(7), based on proposed paragraph (a)(4)(i), 
requires that personal fall arrest systems be rigged to prevent an 
employee from free falling more than 6 feet (1.8 m) or contacting any 
lower level.
    Final rule paragraph (c) sets criteria for the selection, use and 
care of personal fall arrest systems and system components. Paragraph 
(c)(1) (proposed as paragraph (a)(5)) of the final rule requires that 
the attachment point of a body belt be located in the center of the 
wearer's back. The attachment point of a body harness must be in the 
center of the wearer's back near shoulder level or above the wearer's 
head. The proposed rule provided that the connection point must be 
either above the wearer's head or above the waist in the back. Comments 
in the other rulemaking records supported allowing an attachment point 
at the chest position for limited free fall distances. The final rule, 
as regards body harnesses, has been revised accordingly.
    Paragraph (c)(2) of the final rule, which is a new provision, 
requires that ropes and straps (webbing) used in lanyards, lifelines, 
and strength components of body belts and body harnesses be made from 
synthetic fibers or wire rope. OSHA has determined, given the 
difficulty of evaluating the deterioration of natural fiber rope, that 
natural fiber rope is not reliable for use in a personal safety system.
    Final rule paragraph (c)(3), also a new provision, requires ropes, 
belts, harnesses and lanyards to be compatible with all hardware used. 
The use of incompatible equipment may cause a fall, or, during arrest 
of a fall, allow arresting forces which cause injury.
    Paragraph (c)(4), proposed as paragraph (a)(3), requires that 
lifelines and lanyards be protected against cuts, abrasions, burns from 
hot work operations, and deterioration by acids, solvents, and other 
chemicals. The proposed provision, which did not elicit comments, was 
identical.
    Final rule paragraph (c)(5), proposed as paragraph (a)(18), 
requires that personal fall arrest systems be visually inspected prior 
to each use for mildew, wear, damage, and any other deterioration. This 
inspection need not involve testing or impact loading of the system. If 
there is a reasonable basis to believe that the strength or integrity 
of the fall arrest system has been weakened, the employer shall remove 
defective or damaged equipment from service. No comments were received 
on the proposed provision, which was identical to the provision in the 
final rule except for minor editorial changes.
    Paragraph (c)(6), which was proposed as paragraph (a)(2), requires 
that personal fall arrest systems and components that have been 
subjected to impact loading be removed immediately from service and not 
be used again for employee protection until inspected and judged 
suitable for use by a qualified person. The proposed provision, which 
was effectively identical, elicited no comments and has been 
promulgated in the final rule with minor editorial changes.
    Paragraph (c)(7) of the final rule, a new provision, requires that 
the employer provide for prompt rescue of employees in the event of a 
fall or ensure that employees who have fallen can rescue themselves. 
This provision also appears in the proposed general industry rule and 
in the final rule for construction. OSHA anticipates that employers 
will evaluate the potential consequences of falls in personal fall 
arrest systems in their work environments and choose an appropriate 
means of rescue. OSHA recognizes that the rescue requirements for 
employees wearing body harnesses and body belts will differ. For 
example, the Agency anticipates that self-rescue will be more difficult 
for employees using body belts and that the acceptable rescue time for 
such employees will be shorter, because falls in body belts typically 
result in the employee hanging in a jack-knifed position. When it is 
not possible to evaluate the self-rescue capacity of employees in 
advance, prudent employers should assume that employees will need 
rescue assistance and, accordingly, be prepared to offer it. Paragraph 
(c)(8), proposed as paragraph (a)(6), requires that body belts be at 
least 1.625 inches (4.1-cm) wide. OSHA has determined that this minimum 
width will be acceptable for any body belts that are used in personal 
fall arrest systems during the phase-out period. No comments were 
received on this provision.
    Paragraph (c)(9), proposed as paragraph (a)(1), requires that 
personal fall arrest equipment be used exclusively for employee 
protection. For example, this equipment may not be used to hoist 
materials. This revision is intended to prevent the deterioration

[[Page 26336]]

potentially caused by improper uses and types of loads. The proposed 
provision, which was identical, elicited no comments.
    Final rule paragraph (d), Training, proposed as paragraph (a)(19), 
requires that employees be trained to understand the application limits 
of the equipment and the proper hook-up, anchoring, and tie-off 
techniques, before using any personal fall arrest equipment. Affected 
employees must also be trained so that they can demonstrate the proper 
methods of use, inspection, and storage of the equipment. OSHA believes 
that employees must know how their fall arrest equipment works in order 
to get the appropriate protection from it. No comments were received on 
the proposed provision, which was effectively identical to the final 
rule.

Section 1915.160  Positioning Device Systems

    Positioning device systems prevent falls by holding affected 
employees in place while they perform work on vertical surfaces at 
elevations. The provisions of proposed Sec. 1915.159(b) have been moved 
to final rule Sec. 1915.160, so there is a clear distinction between 
the requirements for personal fall arrest systems and those for 
positioning device systems.
    Final rule paragraph (a) sets criteria for connectors and 
anchorages used in positioning device systems. For the same reasons as 
provided in the introductory discussion of final rule Sec. 1915.159, 
the introductory text of final rule Sec. 1915.160 provides that the use 
of non-locking snaphooks will not be acceptable in positioning device 
systems after December 31, 1997. OSHA has included paragraph (a)(4) in 
the final rule to address any non-locking snaphooks that may remain in 
use during the phase-out period.
    Paragraph (a)(1), proposed as Sec. 1915.159(b)1), requires that all 
hardware have a corrosion-resistant finish and that all surfaces and 
edges be smooth to prevent damage to the attached belt or connecting 
assembly. Corrosion resistance is essential to retain the integrity of 
the hardware, while smooth edges and surfaces prevent cuts, tears, or 
other damage to system components. The proposed provision was 
identical, except that the proposed term ``hardware'' has been replaced 
by the term ``connector.'' As discussed above, OSHA has determined that 
it is appropriate to focus attention on the critical load-bearing 
hardware by adopting the term ``connector.''
    Final rule paragraph (a)(2), proposed as Sec. 1915.159(b)(2), 
provides that connecting assemblies, such as snaphooks or D-rings, have 
a minimum tensile strength of 5,000 pounds (22.2 Kn). The proposed 
provision, which did not elicit comments, was identical.
    Final rule paragraph (a)(3), proposed as Sec. 1915.159(b)(3), 
requires that anchorages for positioning device systems be capable of 
supporting twice the potential impact load of an employee's fall. The 
proposed provision, which did not elicit comments, was identical.
    Final rule paragraph (a)(4), proposed as Sec. 1915.159(b)(6)(i), 
provides that snaphooks, unless of a locking type designed and used to 
prevent disengagement, shall not be connected to each other. The 
proposed rule simply prohibited the connecting of snaphooks to each 
other. As discussed above, in reference to the introductory text of 
final rule Sec. 1915.160, the use of non-locking snaphooks is 
prohibited after December 31, 1997.
    Final rule paragraph (b) sets performance criteria for positioning 
device systems. Paragraph (b)(1), proposed as Sec. 1915.159(b)(4), 
requires that restraint (tether) lines have a minimum breaking strength 
of 3,000 pounds (13.3-Kn). This breaking strength is necessary to 
ensure that the line will hold under fall arrest conditions. The 
proposed provision, which did not elicit comments, was identical.
    Paragraph (b)(2), proposed as Sec. 1915.159(b)(5), provides the 
system performance criteria for the different types of positioning 
device systems. These are new performance requirements that are not in 
OSHA's current shipyard standards. In order to allow employers a 
reasonable amount of time to ensure that their equipment meets these 
requirements, OSHA is making this provision effective November 20, 
1996.
    Final rule paragraph (b)(2)(i) provides that window cleaner's 
positioning systems must be capable of withstanding a drop test 
involving a 6 foot (1.83 m) drop of a 250 pound (113 kg) weight. These 
systems must withstand a more rigorous drop test than other positioning 
device systems because of their potential for greater free fall 
distances.
    Final rule paragraph (b)(2)(ii) requires that all positioning 
device systems, other than window cleaners' positioning systems, be 
capable of withstanding a drop test of 4 feet (1.2 m) with a 250 pound 
(113 kg) weight. Positioning device systems which comply with the 
provisions of Section 2 of Appendix B will be deemed by OSHA to meet 
the requirements of this paragraph. The proposed provision, which 
elicited no comments, was identical.
    Final rule paragraph (c) sets criteria for the use and care of 
positioning device systems. Final rule paragraph (c)(1), proposed as 
Sec. 1915.159(b)(7), requires the inspection of positioning device 
systems before each workshift for mildew, wear, damage, and other 
deterioration. This provision further requires that defective 
components identified in such inspections be removed from service. The 
proposed language was nearly identical, except that it provided for 
removal of defective equipment ``if their functions or strength may 
have been adversely affected.'' OSHA has determined that the deletion 
of that language will make the rule easier to understand, because 
employers will simply remove components from service that are 
identified as defective without having to make a specific determination 
about strength or function.
    Final rule paragraph (c)(2), proposed as Sec. 1915.159(b)(6)(ii), 
requires that positioning device systems or components subjected to 
impact loading be removed immediately from service and not be used 
again for employee protection, unless inspected and determined by a 
qualified person to be undamaged and suitable for reuse. This 
requirement is necessary to ensure that systems used for employee 
protection still meet the performance criteria for such systems before 
they are reused for this purpose. The proposed provision, which did not 
elicit comments, was identical.
    Final rule paragraph (d), Training, proposed as 
Sec. 1915.159(b)(6)(iii), provides that employees must be trained in 
the application limits, proper hook-up, anchoring, and tie-off 
techniques, methods of use, inspection, and storage of positioning 
device systems before they may use those systems. This provision 
emphasizes the importance of employee training in the safe use of 
positioning device systems; for these systems to provide employee 
protection, two elements are essential. The systems must be designed 
and used in accordance with stated performance criteria, and the 
employee(s) using the system must be adequately trained in the safe use 
of the system. The proposed provision, which did not elicit comments, 
was identical.

Incorporation by Reference

    Another action in this document is the consolidation, within part 
1915, of OSHA's Incorporation by Reference (IBR) statements of 
approval, which indicate clearance by the Office of the Federal 
Register, into a single section,

[[Page 26337]]

Sec. 1915.5. Existing section 1915.5 is being updated and revised to 
accomplish this consolidation. This approach is consistent with that 
taken by other Federal agencies. As amended, Sec. 1915.5 contains the 
national consensus standard organizations' addresses and the IBR 
approval language. This approach saves text by cross-referencing from 
the regulatory text where an IBR is set out to the IBR section. Without 
such a section, the addresses of the standards organizations, the OSHA 
Docket Office address, and the IBR approval statement would need to be 
repeated with each incorporation by reference throughout the shipyard 
standards. A consolidated IBR Section will also be easier to update.

Appendices

    OSHA is including two non-mandatory appendices to final part 1915 
subpart I.

Appendix A

    Appendix A provides suggested guidelines for complying with the 
requirements for hazard assessment for the selection of personal 
protection equipment.
    In developing the final rule for this rulemaking, OSHA has 
determined that Appendix B of the corresponding General Industry 
standard (part 1910, subpart I) contains some useful information that 
would be helpful to shipyard employers. Therefore, OSHA has decided to 
add a detailed Appendix A to the shipyard PPE standard to provide some 
examples of guidelines which an employer may follow in complying with 
OSHA's performance-oriented final rule. Those guidelines include 
examples of hazard assessments performed by work activity.

Appendix B

    Appendix B contains testing methods and other information to assist 
employers in complying with the performance-oriented criteria for 
personal fall arrest systems and positioning device systems contained 
in this standard. Many revisions have been made to this appendix based 
on the comments received during the powered platform rulemaking (Docket 
No. S-700A). These changes are intended to clarify and simplify the 
information presented. A complete discussion of the comments and 
reasons for the changes are included in the Powered Platforms for 
Building Maintenance final rule (54 FR 31452).

Amendments to Other Subparts of the Shipyard Standards

    This final rule also revises cross references in subparts C and H 
of the shipyard standards, so that those provisions reference subpart 
I. The existing references would no longer identify the correct 
paragraphs in subpart I because of the reformatting of Subpart I. These 
revisions are editorial in nature and do not substantively change the 
current requirements in other subparts.

IV. Summary of Final Economic Analysis, Regulatory Flexibility 
Analysis, and Environmental Impact Assessment Summary

    In accordance with Executive Order 12866, OSHA has developed a 
final economic analysis to support the final standard for personal 
protective equipment (PPE) in the shipyard industry. The Agency has 
also analyzed the standard's impact on small entities, as required by 
the Regulatory Flexibility Act, and its potential to cause adverse 
environmental impacts, as required by the National Environmental Policy 
Act. The final rule, which will be codified as subpart I of the 
shipyard employment standards (29 CFR 1915), covers the use of personal 
protective equipment for the head (e.g., hard hats), eyes (e.g., 
goggles), feet and hands (e.g., shoes and gloves), and body (e.g., 
chemical protective clothing), contains the respirator requirements 
that have been part of OSHA's shipyard standards since 1971, and adds 
requirements for personal fall protection systems and positioning 
device systems.
    Injuries in the shipyard industry are frequent and severe. The 
shipyard industry (SIC 3731) has the second highest rate of lost 
workday injuries and illnesses (37.8 per 100 full-time workers), 
according to the BLS publication ``Occupational Injuries and Illnesses: 
Counts, Rates, and Characteristics, 1992'' (published in April 1995). 
The industry also has one of the highest average number of lost 
workdays per injury (more than 40 percent of lost workday injuries 
involve more than 10 days away from work, according to the same BLS 
publication).
    To address those shipyard injuries that result from the failure to 
use PPE or from the use of inadequate PPE, and to raise the minimum 
standard of PPE use in the industry to the level of technology 
currently available, OSHA has developed this final rule. The rule 
requires employers to meet minimum specifications for PPE employed to 
protect the eyes and face, hands and body, and feet, as well as those 
for respiratory protection, lifesaving, and personal fall protection 
equipment. In addition, the final rule requires employers to conduct 
hazard assessments, include specific elements related to PPE in the 
training they provide to their workers, document training and hazard 
assessments, require the use of body harnesses in place of body belts 
after a phase-in period, and ensure the use of locking snaphooks on 
personal fall protection equipment. Rulemaking participants from the 
shipyard industry report that most employers in the industry are 
already in compliance with the requirements of the final standard. For 
example, one industry representative stated ``* * * most shipyards 
require employees to wear personal protective equipment in all areas 
beyond the office doors. * * * We've already identified and protected 
our employees and our visitors because of the hazardous work 
environment'' [January 25, 1995 public meeting, Transcript page 9].
    The economic analysis identifies a number of benefits that 
employers and employees will experience as a result of compliance with 
the standard. For example, the Agency has concluded that the rule's 
requirements for body harnesses and locking snaphooks will reduce the 
risk of fatal falls, and these requirements will also reduce the 
severity of the injuries resulting from non-fatal falls. In addition, 
the final rule is estimated to prevent about 1,550 lost workday 
injuries annually and 12,650 non-lost workday injuries caused by the 
failure to use PPE or the use of inadequate PPE.
    The Agency estimates that employers in the affected industry will 
incur estimated annual costs of compliance of $163,000. These costs, 
which average about $2 per covered employee, will not impose 
substantial economic impacts on affected firms in any size-class. OSHA 
has also evaluated the impacts of compliance costs on the average small 
shipyard and has determined that, even under a no cost pass through 
assumption, worst case impacts on such establishments will average no 
more than $100 annually. OSHA has therefore concluded that this 
standard will not impose an undue burden on small firms; in addition, 
the standard will not have an adverse effect on the environment.

Introduction

    Executive Order 12866 requires the Agency to perform an analysis of 
the costs, benefits, and regulatory alternatives of its regulatory 
actions. If a regulation is deemed ``significant'' by the Administrator 
of OMB's Office of Information and Regulatory Affairs

[[Page 26338]]

(OIRA), OIRA reviews the regulation and OSHA's economic analysis. A 
regulatory action is considered significant if it imposes annual costs 
on the economy of $100 million or more or has an adverse effect on the 
economy, a sector of the economy, productivity, competition, jobs, the 
environment, public health or safety, or State, local, or tribal 
governments or communities. This final rule directly affects only one 
well-defined industry, the shipbuilding and ship repair industry, and 
the estimated costs of compliance are far below the $100 million 
threshold. OSHA has therefore concluded that the promulgation of this 
final standard for personal protective equipment in shipyard employment 
is not a significant action under the guidelines of E.O. 12866.
    As required by the OSH Act and its judicial interpretations, the 
Agency must demonstrate that all of its regulations are both 
technologically and economically feasible, and specifically that this 
is the case for this rule. The Agency has concluded that this standard 
meets both tests of feasibility. A summary of the Agency's feasibility 
assessment of the final rule is presented in the following section of 
the Economic Analysis.
    In addition, the Regulatory Flexibility Act of 1980 (5 U.S.C. 601 
et seq.) requires federal agencies to determine whether a regulation 
will have a significant economic impact on a substantial number of 
small entities. The Agency must also review this standard in accordance 
with the requirements of the National Environmental Policy Act (NEPA) 
of 1969 (42 U.S.C. 4321 et seq.), the Guidelines of the Council on 
Environmental Quality (CEQ) (40 CFR Part 1500), and OSHA's DOL NEPA 
Procedures (29 CFR Part 11).
    This summary of the economic analysis includes an overview of the 
affected industry and employees at risk, the estimated benefits of the 
rule, the technological feasibility of the standard, the estimated 
compliance costs shipyard employers will incur, the impact of those 
costs on firms in the shipyard industry, the results of the regulatory 
flexibility and economic analysis, and a discussion of regulatory and 
non-regulatory alternatives. The full text of the economic analysis is 
in the shipyard PPE docket (Docket S-045).

Industry Profile

    The American shipyard industry has been in a long-term decline 
since 1981 when the federal government ended subsidies for commercial 
ship construction. In the period 1976-1980 the industry built an 
average of 64 merchant vessels per year. Only five commercial ships 
have been built since 1988. The decline in merchant vessel construction 
in the 1980's was partially offset by a large increase in military ship 
construction. However, the end of the military competition with the 
former U.S.S.R. has resulted in a sharp drop in military ships on 
order. The ``bottom-up'' review of the armed forces called for a major 
reduction in the number of active combat ships, and consequently has 
caused a drop in the number of future orders. U.S. Navy orders, which 
averaged 19 per year in the 1980's, are projected to fall to 8 per year 
during the period 1994-1999. Ship repair and construction of inland 
vessels and barges has remained constant during the past five years.
    Recently American shipyards have received new orders for 
construction of commercial ships (Wall Street Journal Nov. 15, 1995). 
These orders result mainly from a new Federal loan guarantee program 
approved by Congress but also are due to exchange rates that have made 
American-made products cheaper relative to foreign-produced goods. Wage 
rates in American shipyards were already well below those of some 
important foreign competitors, such as Germany and Japan, whose 
governments heavily subsidize their shipbuilding industries. A new 
global trade accord that would end shipbuilding subsidies may be signed 
in the near future. This would allow American shipyards to compete 
internationally, increase commercial ship construction, and increase 
employment levels in the industry. The Agency estimates that employment 
in American shipyards will end its decline and level off or increase 
slightly for the next two to three years. Future employment levels 
depend on funding for the guaranteed loan program, exchange rates and 
the relative price of American versus foreign-built ships, foreign 
governments' level of subsidy to their shipyards, and the status and 
terms of a global accord to end subsidy programs.
    Employment in the shipbuilding industry declined from 177,000 in 
1984 to about 125,000 by 1987 and remained near that level until 1992. 
The Bureau of Labor Statistics estimates that employment in the 
industry was 106,000 by late 1993. The most recent BLS ``Employment and 
Earnings'' (May 1995) estimates the same level of employment and 
reports that about 79,000 of these employees are production workers. In 
1994, the value of output from American shipyards was approximately 
$9.5 billion (1994 Industrial Outlook estimate). Based on Dun & 
Bradstreet's estimated mean return for the shipyard industry of 2.9 
percent, the industry earned approximately $275 million in 1994.
    The Agency estimates that there are approximately 500 firms in SIC 
3731, and a majority of these have fewer than 50 employees. Employment 
in the shipyard industry is highly concentrated. The ten largest 
shipyards employ approximately 70 percent of all shipyard workers, and 
only the 100 largest firms have as many as 100 employees each. The 
Agency estimates that approximately 300 firms engaged in ship repair 
employ fewer than 20 employees. Many of these small firms perform 
contracting for larger firms; those that do so already follow the PPE 
guidelines of the employing shipyards.

Employees at Risk

    Numerous sources confirm that about 75 percent of shipyard 
employees are production workers, including the 1987 Census of 
Manufactures (Bureau of the Census 1990) and CONSAD Research 
Corporation (1986). The Agency thus concludes that an estimated 79,000 
production workers in this industry are now exposed to workplace 
hazards that may require the use of PPE of the types covered by the 
final rule.

Technological Feasibility

    Equipment to meet the final PPE standard, such as hard hats, 
gloves, and safety shoes, is readily available and widely used 
throughout the industry. Off-the-shelf safety programs that include 
guidance on the conduct of hazard assessments, as well as training 
program materials, are readily available, and these programs are also 
well established throughout the industry. ``Hazard assessments are a 
standard practice at EBDiv. [Electric Boat Division]'' [Ex. 9-10]. 
``Shipyards are safety conscious. Every shipyard in the Hampton Roads 
area has a safety program and a safety officer * * * STASR shipyards 
have safety programs with many of the PPE standards already in place. 
The [proposed standard's] PPE training and recordkeeping requirements 
are, in some cases, redundant'' [South Tidewater Association of Ship 
Repairers, Ex. 9-3].
    Training documentation is usually maintained by shipyard employers 
in a computer database. The Agency therefore concludes that the final 
PPE standard is technologically feasible. The performance-oriented 
criteria of the standard should also allow technological innovation to 
improve PPE protection in the future.

[[Page 26339]]

Costs

    The preliminary cost estimates prepared by OSHA to support the 
proposed shipyard PPE standard published in 1988 included compliance 
costs that shipyard employers would incur to comply with a number of 
proposed requirements for respirator use. However, the final standard 
does not include any new respirator requirements, because the Agency 
expects to publish a final rule addressing respirator use in all 
industries in the near future. Thus, this final rule includes only 
those respirator provisions that have been included in OSHA's shipyard 
rules since 1971.
    In response to the preliminary Regulatory Impact Analysis (1988), 
OSHA received only one comment on the costs of the proposed standard. 
Peterson Builders [Ex. 6-14], referring to the proposed requirement for 
foot protection in Section 1915.156, stated that buying protective 
footwear for all employees--which the commenter interpreted as being 
required by the proposed standard--would be costly and unnecessary. The 
Agency has recently clarified its policy on the purchase of PPE to make 
clear that employers do not have to purchase equipment that may also 
have personal use; OSHA believes that the costs of PPE will therefore 
be substantially less than this commenter expected. In addition, as 
noted above, OSHA's 1988 Preliminary Regulatory Impact Analysis (see 
Docket S-045) noted that the use of PPE in shipyards is already 
widespread.
    On April 6, 1994 OSHA published a final standard for PPE in general 
industry (59 Federal Register No. 66). On July 6, 1994, the Agency 
reopened the record for the shipyard PPE standard to incorporate the 
general industry PPE docket into the shipyard PPE docket and to propose 
the addition of several elements from the general industry standard to 
the shipyard standard. These elements included requirements for: 
certification of workplace hazard assessments; certification of 
training; specification of training elements; the phasing out of body 
belts in favor of body harnesses; and the replacement of non-locking 
snaphooks with locking snaphooks. The Agency's intent in taking this 
action was to make the PPE standard consistent where possible in both 
shipyards and the general industries. Following the comment period, a 
Federal Register notice announcing a public meeting and containing 
additional discussion of some of the issues raised by the reopening was 
published on December 13, 1994. A public meeting was held on January 
25, 1995 to hear testimony about the proposed changes to the shipyard 
standard introduced during the reopening of the record.
    Representatives of the shipyard industry and industry associations 
opposed the new requirements for work place hazard assessments and the 
certification of such assessments. First, the industry asserted that 
job-related activities in shipyards are unique because a shipyard is 
not a fixed ``workplace.'' Instead there is a constant shifting of 
trades between work locations as employees move among various shops and 
vessels; in addition, in ship repair and overhauling, the vessels being 
worked on constantly change. According to these commenters, it is not 
possible for designated shipyard employees to continuously assess the 
hazards of a ``workplace'' that is constantly changing. According to 
one participant, a better approach would be to perform hazard 
assessments by trade to determine the level of PPE required [South 
Tidewater Association of Ship Repairers, Ex. 9-3]. Numerous commenters 
agreed with this view [Exs. 9-1, 9-7 through 9-12].
    As discussed above in relation to final rule Sec. 1915.152(b), OSHA 
agrees that it is appropriate to allow employers flexibility in 
organizing their hazard assessment efforts. The Agency has underscored 
the performance-oriented nature of that provision by adding a note to 
the final rule which states that hazard assessments conducted according 
to the trade or occupation of affected employees are acceptable so long 
as they address any PPE-related hazards to which employees are exposed 
in the course of their work activities.
    The shipyard industry also opposed the requirement for 
certification of hazard assessments because, in the opinion of 
commenters, certification would require employers to expend resources 
for new paperwork activities ``for the convenience of the Agency'' that 
would not result in additional safety for production workers [Ex. 9-
11]. Industry commenters also were concerned that certification might 
increase their liability when injuries occur. Other shipyards that 
currently rely on worker involvement to analyze risks feared that 
certification would disrupt that process [January 25, 1995 public 
meeting transcript pages 28 and 41-47]. The shipyard industry also 
opposed the certification of hazard assessments on the grounds that 
these assessments would be redundant, since the industry already 
performs many PPE-related hazard assessments for individual health and 
safety standards such as hearing conservation, lead, confined spaces, 
respirator use, and other OSHA standards.
    In its Federal Register notice on December 13, 1994 announcing a 
public meeting on shipyard PPE issues, the Agency asked for information 
on whether simple documentation would suffice in place of 
certification. In testimony at the public meeting and in comments 
submitted following the meeting, industry representatives stated that 
they did not oppose documentation of hazard assessments. In fact, they 
reported that it is routine in the industry to conduct such assessments 
and to document them:

    * * * hearing conservation, respiratory protection, hazard 
communication, lockout/tagout, lead abatement, blood-borne 
pathogens, medical surveillance programs * * * [are] programs that 
are already in place that [require] us to do hazard assessments of 
the workplace in order that we provide PPE * * * Where hazard 
assessment does not exist, and it would be hard for me to say where 
it doesn't in the shipyard industry, we'd recommend that an annual 
assessment be made. [Shipbuilders Council, January 25, 1995 public 
meeting transcript page 11].

    Commenters within the shipyard industry also opposed the general 
industry PPE requirement to certify training, largely for the same 
reasons as those noted above for the certification of hazard 
assessments--the creation of potential new legal liability and 
unnecessary paperwork. In its December 13, 1994 announcement, the 
Agency suggested that simple documentation could be used in lieu of 
certification, and the final rule requires documentation rather than 
certification.
    Commenters were generally supportive of the standard's training 
requirements and the specific elements of training mandated by the 
rule. Commenters stated that the PPE training elements proposed by the 
Agency were practiced throughout the shipyard industry, as was the 
maintenance of training logs--usually in the form of a computer 
database:

    We support the general requirement for training as it does serve 
to enhance a safer working environment [Shipbuilders' Council [Ex. 
9-9]].
    We are already complying with this proposed standard [for 
training] and we suspect many other shipyards are also complying. * 
* * Our new hire orientation programs covers all areas of PPE and 
would meet the new requirements proposed in the standard [Tampa 
Shipyards, Ex. 9-8].
    We'd recommend this documentation [for training] be in the form 
of training logs, which most of us already keep on the computer 
[Shipbuilders' Council January 25, 1995 public meeting, Transcript 
page 13].

[[Page 26340]]

    There was widespread support among industry commenters for the use 
of body harnesses in place of body belts:

    Electric Boat Division utilizes body harnesses for all of its 
fall protection needs. * * * [Ex. 9-10].
    BIW/Local S6 has implemented a policy which is consistent with 
the construction industry standard in that only body harnesses may 
be used in fall arrest systems and body belts may be used in 
positioning device systems [Bath Iron Works Ex. 11-7].
    Without a doubt, the majority of our membership endorses the use 
of harnesses. Most of us already have those in place [Shipbuilders' 
Council January 25, 1995 public meeting, Transcript page 14].

    However, Newport News Shipbuilding (NNS), which employs about 20 
percent of all shipyard employees, opposed the phase-out of body belts 
in favor of harnesses. NNS relies almost completely on body belts for 
fall protection, although the shipyard did report using a small number 
of harnesses. Several small yards also still rely on body belts for 
fall protection and questioned the utility of changing to body 
harnesses since they had experienced no injuries due to the use of body 
belts [Exs. 9-1, 9-3 and 9-11]. At the public meeting, NNS stated that 
replacing over 4,700 body belts would be a burden and therefore that a 
seven-year phase-in period would be needed to reduce the economic 
impact. The company reported that a review of several years' accident 
records failed to show that falls of employees using body belts 
resulted in any severe injuries. NNS did not introduce its data on 
falls into the record, however. A cost analysis presented by NNS at the 
hearing showed that body belts cost NNS $43 each and, on average, 
lasted 7 years; harnesses cost $140 and have a working lifetime of 3 
years.
    Most other shipyards and industry associations reported that they 
had switched to harnesses from belts. These commenters reported that, 
although harnesses cost more than belts, they provide greater 
protection and are cost effective.

    We * * * endorse the use of body harnesses as a safety method 
for employees. While the cost of a body harness is usually twice the 
amount of body belts, the added safety factor to the employee is 
well worth the money, and in the long run will save the company 
money is case of an accident [Atlantic Marine Ex. 9-9].
    In fact many of our yards already use them [harnesses]. We find 
them to be very effective, and everybody seems to certainly feel a 
lot safer with them [Shipbuilders' Council January 25, 1995 public 
meeting, Transcript page 23].

    At the public meeting on January 25, 1995, representatives of the 
American Insurance Service [Tr. 59] stated that body harnesses would 
prevent injuries that could occur in falls involving employees wearing 
body belts. In addition, they said that it is difficult to rescue a 
worker in a body belt after a fall since he or she typically is hanging 
``nose to toes,'' or upside down. Several falls involving employees (in 
other industries) wearing body belts had resulted in fatalities when 
the fallen worker had slipped out of his/her body belt. The insurance 
representatives also asserted that the cost of harnesses should not 
preclude the inclusion of a harness requirement in the rule because 
industry has known that the change to harnesses was going to occur, 
body belts are usually ``expense'' items, and, if treated as a capital 
expense, will have been fully depreciated by the effective date of the 
regulation. The association did not provide any data demonstrating that 
the injuries associated with falls in body harnesses was less severe 
than those in belts. Belts were estimated to cost $35 each and 
harnesses $75 each. Harnesses were estimated to last an average of 2 to 
4 years.
    OSHA agrees with the assessment of most of the commenters from the 
shipyard industry and the insurance industry who supported the 
requirement for harnesses in lieu of belts, and the final rule thus 
contains such a requirement.
    Many commenters endorsed the adoption of locking snaphooks over 
non-locking snaphooks on lifelines [Ex. 9-10 and January 25, 1995 
public meeting, Transcript page 52]. Locking snaphooks are already in 
widespread use in shipyards. At the January 25, 1995 public meeting, 
representatives from the American Insurance Service demonstrated how, 
in a ``roll-out'' situation, lifelines can detach from non-locking 
snaphooks. Most industry commenters reported that snaphooks were used 
in their shipyard, and none opposed this change to the standard or 
raised it as a cost issue.
    Based on the record for this rulemaking, the Agency has concluded 
that the only provisions of the final PPE standard that will impose 
other than negligible costs on shipyard employers are: the replacement 
of body belts with body harnesses; the documentation of hazard 
assessments; the development of training for body harnesses in 
shipyards not already employing harnesses; and employee training for 
body harnesses. Only Newport News Shipbuilding (NNS) and a number of 
small shipyards reported that they still rely on body belts. (Very 
small shipyards specialize in trades and may not use body harnesses or 
body belts at all). OSHA has taken the concerns of these commenters 
into account in the final rule. NNS stated that it currently uses about 
4,700 body belts, although no information was available on the 
breakdown between belts used as positioning devices (this would not be 
affected by the final rule) and those used for fall protection. To the 
extent that some of these belts continue to be used for positioning 
devices, the 4700 figure overstates the number of harnesses to acquire. 
The Agency estimates that NNS will need to purchase no more than 3,000 
harnesses (about 1 for every 5 production workers). The Agency 
estimates that, in addition to NNS, some smaller employers in the 
industry may need to buy harnesses to replace body belts, and the 
Agency estimates that 1,000 harnesses would be purchased by these 
employers. Based on evidence in the record and information from 
suppliers, the Agency estimates that body belts cost about $50 and 
harnesses $100. Body belts are estimated to last an average of 7 years 
and harnesses 3 years. Thus, body belts supply fall protection at a 
cost of roughly $7 per year ($50/7 years), while harnesses do so at $33 
per year ($100/3 years). Harnesses therefore cost roughly $27 more per 
year than belts for each affected employee. Since body belts can still 
be used as positioning devices, the requirement that harnesses be used 
for fall protection will not end the useful life of these belts. Based 
on these estimates, OSHA concludes that replacing body belts with 
harnesses will result in a new annual cost to the industry of 
approximately $128,000 [(3,000 new harnesses for NNS+1,000 new 
harnesses for small shipyards) x $27]. Nevertheless, to allow 
additional time and reduce any potential impacts, the final rule 
permits shipyards to phase-in compliance with the body harness 
requirement over two years, which is consistent with the phase-out date 
in other OSHA standards.
    The hazard assessment documentation required by the standard 
consists of a record, either paper or on a computer or other storage 
medium, with the date of the hazard assessment, name of person 
performing the assessment, occupation or operations covered, and a list 
of the PPE required. Shipyards report that they already incorporate 
some of this information in their current training materials. The 
Agency has estimated that it would take each shipyard about an hour to 
develop a computer-based record format for this documentation and 
approximately five minutes to record the hazard assessment

[[Page 26341]]

for each occupation covered. Table 3 summarizes this information for 
the PPE standard. The total time expended by managers to document 
hazard assessments is estimated to be 781 hours, a one-time commitment 
of management resources.

  Table 3.--Estimate of Amount of Time To Document Hazard Assessments, Develop Training Programs for Body Harnesses, and Train in Use of Body Harnesses 
                                                         for OSHA's Standard on PPE in Shipyards                                                        
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                 Hazard assessment      Develop training for hamesses               Training            
                                                            --------------------------------------------------------------------------------------------
                                                  Number of                 Time to     Time to                Total                                    
         Firm Size (number of employees)           firms in   Number of     document    develop   Number of   time to    Training  Management  Number of
                                                     size       hazard       hazard     training  firms who   develop    sessions     time     employees
                                                   category  assessments  assessments   per firm   must do    program    per firm    (hours)    trained 
                                                               (trades)     (hours)     (hours)       so      (hours)                           (hours) 
--------------------------------------------------------------------------------------------------------------------------------------------------------
1000+...........................................         12          40           36   .........       none          0        150         150       3000
500-999.........................................         12          30           30           8          6         48          4          24        200
100-499.........................................         76          30          190           4         76        304          2         152        400
21-99...........................................        100          10          150           4        100        400          1         100        200
11-20...........................................        100           5          125           2         50        100          1          50        200
1-10............................................        200           5          250           2        100        200          1         100        150
                                                 -------------------------------------------------------------------------------------------------------
      Subtotals (hours).........................  .........  ...........     \1\ 781   .........  .........   \1\ 1052  .........         576       4150
                                                 =======================================================================================================
Total one-time, or first year, management                                                                                                               
 resources for hazard assessments and                                                                                                                   
 development of training........................  .........  ...........  ...........  .........  .........  .........  .........  ..........  \2\ 1,833
First year management resources to conduct                                                                                                              
 training.......................................  .........  ...........  ...........  .........  .........  .........  .........  ..........    \2\ 576
Total management time...........................  .........  ...........  ...........  .........  .........  .........  .........  ..........  \2\ 2,409
Total employee time.............................  .........  ...........  ...........  .........  .........  .........  .........  ..........  \2\ 4,150
--------------------------------------------------------------------------------------------------------------------------------------------------------
Source: Office of Regulatory Analysis.                                                                                              
FR Doc. 96-12573 Personal Protective Equipment for Shipyard Employment (PPE)
                    
                                                                                                                                                        
\1\ One-time.                                                                                                                                           
\2\ Hours.                                                                                                                                              

    The development of training materials for the use of personal fall 
arrest systems (body harnesses) imposes a one-time cost for shipyards 
that are not already using harnesses. Some of the very smallest 
shipyards who provide specialty trade work will not have or use any 
harnesses. All large shipyards already use harnesses to some extent, 
and the Agency has concluded that these shipyards also have developed 
training materials. Because training videos and written materials on 
the use of body harnesses are widely available, the Agency has 
concluded that the time required for establishing such a training 
program will be small. Table 3 presents the Agency's estimate of the 
time that firms will expend to develop training for the use of body 
harnesses; the estimate ranges from 8 hours for firms with more than 
500 employees to 2 hours for the smallest employers. The total time 
required to develop training for body harnesses is estimated to be 
1,052 hours of management time.
    Firms that do not currently use body harnesses must also train 
their employees as harnesses are substituted over time for body belts. 
The cost of this training consists of management or trainers' time to 
provide training to employees as well as the value of employee wages 
foregone while training. The Agency estimates a training session will 
take approximately one hour and that as many as 10 to 20 employees can 
receive training in a single session. Table 3 presents the Agency's 
estimate of the number of sessions by firm size that will be necessary 
for training in body harnesses and the number of employees trained. The 
Agency estimates that a higher fraction (10 percent or more) of smaller 
firms' employees will have to be trained due to the nature of their 
business--cleaning tanks, repairs over the ship's side, painting and 
maintenance--which require the use of harnesses. Among large firms only 
NNS relies primarily on body belts and uses only a few body harnesses. 
The Agency estimates that all of NNS's body belts (4,700) will not have 
to be replaced with harnesses, since compared with smaller yards less 
work conducted at large shipyards or in new ship construction requires 
a body harness (rather than a body belt). The Agency has estimated that 
NNS will replace 3,000 body belts with harnesses. Data for the cost of 
body harness training is included in Table 6. The Agency estimates that 
576 hours of management time and 4,150 hours of employee time will be 
required for training.
    The total one-time cost for documenting hazard assessments, 
developing harness training materials, and providing training is 2,409 
management hours and 4,150 employee hours. Average hourly employee 
wages for SIC 3731 are about $14.00 per hour (``Employment and 
Earnings'' Bureau of Labor Statistics October, 1994). The Agency 
estimates that the cost of wages plus benefits is $20 per hour for 
production employees and $30 per hour for managers.
    The total cost of these elements of the standard is approximately 
$155,000. Annualized over five years at 7 percent, this cost is about 
$35,000 per year. Added to the annual cost of body harnesses of 
$128,000, the Agency estimates that the total annualized cost of the 
PPE standard is $163,000 per year for the shipyard industry.

Economic Impacts

    With industry revenues exceeding $9 billion and an estimated profit 
of $275 million in 1994, the annual estimated compliance costs 
associated with the standard ($163,000) will not cause a significant 
impact on the revenues or profits of firms in the shipyard industry.

[[Page 26342]]

Benefits

    The final shipyard PPE standard will reduce the risk of injury or 
fatality confronting workers who fall while wearing body belts. After 
the phase-in period, shipyard workers who fall while wearing body 
harnesses will experience fewer fatalities or severe injuries as a 
result of these falls. Although industry and insurance representatives 
testified to the beneficial effects of harnesses, data in the record 
are not sufficiently detailed to quantify the magnitude of the reduced 
risk. Accordingly, OSHA has not quantified this risk reduction or the 
productivity gains associated with the use of harnesses compared with 
belts. In addition, the use of locking snaphooks, as required by the 
final rule, will prevent roll-out thus reducing the risk of fatality or 
severe injury.
    The Agency has also analyzed the more typical PPE-related injuries 
of lesser severity. OSHA estimates that compliance with the final 
shipyard personal protective equipment rule will potentially prevent 
about 1,550 lost workday injuries (15 percent of all shipyard PPE-
related lost workday injuries) and about 12,650 non-lost workday 
injuries (about 46 percent of all shipyard PPE-related non-lost workday 
injuries). To develop this estimate, the Agency analyzed a sample of 
over 1,700 shipyard injuries reported on OSHA Form 200's that were 
collected as part of recent OSHA survey efforts. For each injury or 
illness in the sample, OSHA judged whether the injury or illness was 
potentially preventable through the use of the appropriate type of 
protective equipment. These judgments were based on the injury and 
illness descriptions on the Form 200. OSHA considered the following 
types of PPE to be applicable: hard hats, safety glasses and goggles, 
welding goggles and helmets, face shields, safety shoes, work gloves 
and other forms of hand protection, and chemical protective gloves, 
aprons, and other clothing.
    To develop its estimate, OSHA first divided the sample injuries and 
illnesses by severity and estimated the fraction of cases that were 
judged to be potentially preventable by PPE use. Next, OSHA applied 
these preventability rates to Bureau of Labor Statistics employment 
levels for 1994 for the shipyard industry and calculated the number of 
cases that might be prevented through PPE use. The results of this 
analysis are shown in Table 4. Of 27,317 shipyard injuries and 
illnesses without lost-workdays, 12,665 (46.4 percent) were estimated 
to be potentially preventable through proper use of PPE. Of 9,876 cases 
involving days away from work, OSHA estimated that 1,549 (15.7 percent) 
were potentially preventable through compliance with OSHA's PPE 
requirements. These estimates indicate that over 10 percent of all 
shipyard injuries (both lost-time and non-lost work time) are 
potentially preventable through the proper use of safety glasses, while 
15 percent are potentially preventable through the use of work gloves 
or other appropriate forms of hand protection. This analysis of 
``typical'' PPE injuries parallels the benefits analysis performed for 
the general industry PPE standard, with one exception. In this shipyard 
analysis, the Agency has reduced its estimate of the number of eye 
injuries that could be prevented by the use of safety glasses to 50 
percent (a figure of about 99 percent was applied in the general 
industry analysis), because shipyard representatives and OSHA personnel 
report that the use of basic eye protection is standard practice in 
shipyards, which are widely recognized as being especially hazardous 
environments. The Agency concludes that fewer eye injuries occur in 
shipyards than general industry establishments because employees in 
shipyards, unlike those in general industry, are routinely required to 
wear safety glasses.

                       Table 4.--Preventability of Shipyard Injuries by Type of PPE (1994)                      
----------------------------------------------------------------------------------------------------------------
                                     Injuries without lost-      Injuries with lost-          All injuries      
                                            workdays                  workdays         -------------------------
  Injury preventability/PPE type   ----------------------------------------------------                         
                                       Number      Percent       Number      Percent       Number      Percent  
----------------------------------------------------------------------------------------------------------------
Preventable:                                                                                                    
    Hard hat......................          753          2.8          133          1.3          886          2.4
    Safety glasses \1\............        3,509         12.8          346          3.5        3,855         10.4
    Safety goggles................          422          1.5           88          0.9          510          1.4
    Welding goggles/helmet........          632          2.3          137          1.4          769          2.1
    Face shield...................        1,024          3.7           33          0.3        1,057          2.8
    Safety shoes (metatarsal                                                                                    
     guard).......................          392          1.4          237          2.4          628          1.7
    Safety shoes (toe protection).          361          1.3          109          1.1          470          1.3
    Safety shoes (sole protection)          151          0.6            0          0.0          151          0.4
    Work gloves...................        5,120         18.7          406          4.1        5,526         14.9
    Chemical protective gloves....            0          0.0           48          0.5           48          0.1
    Chemical protective clothing..          301          1.1           13          0.1          314          0.8
                                   -----------------------------------------------------------------------------
      Total preventable...........       12,665         46.4        1,549         15.7       14,214         38.2
Not Preventable...................       14,652         53.6        8,327         84.3       22,979         61.8
All injuries......................       27,317        100.0        9,876        100.0       37,193        100.0
----------------------------------------------------------------------------------------------------------------
\1\ Rate for eye injuries preventable by safety glasses adjusted downward by 50.0% due to current high rate of  
  safety glass use in shipyards.                                                                                
Source: Bureau of Labor Statistics. 1992. Survey of Occupational Injuries and Illnesses; OSHA estimates based on
  analysis of Form 200 Shipyard Injury Database. Estimates of the number of 1992 injuries and illnesses         
  extrapolated to 1994 based on decline in shipyard employment of 14.4 percent over this period.                

    OSHA also used data supplied by the BLS describing the distribution 
of shipyard lost-workday cases by body part injured to develop 
disaggregated estimates of the number of preventable injuries. These 
estimates are shown in Table 5. OSHA estimates that 90 percent of the 
head, scalp, and toe injuries are potentially preventable. OSHA also 
judged PPE to be effective, at lower rates, in preventing face, eye, 
foot, hand and finger injuries.

[[Page 26343]]

                 Table 5.--Preventable Shipyard Injuries and Illnesses by Severity and Body Part                
----------------------------------------------------------------------------------------------------------------
                                                                         Number of      Share of                
                                                           Number of   extrapolated     injuries      Number of 
                Injury severity/body part                     1992         1994        preventable     injuries 
                                                            injuries   injuries \3\        \4\        prevented 
--------------------------------------------------------------------------------------(percentage)--------------
Injuries and illnesses without lost workdays\1\.........       31,900        27,317           46.4        12,665
Lost-workday injuries and illnesses:\2\                                                                         
    Head, unspecified...................................           73            63          100.0            63
    Ear(s)..............................................            0             0            0.0             0
    Eye(s)..............................................        1,080           925       \5\ 61.7           571
    Face................................................           51            44           75.0            33
    Scalp...............................................           91            78       \6\ 90.0            70
    Neck................................................          350           300            0.0             0
    Arm(s), Unspecified.................................           49            42            0.0             0
    Elbow...............................................          265           227            0.0             0
    Forearm.............................................          128           110            0.0             0
    Wrist...............................................          478           409           12.5            51
    Hand(s).............................................          508           435           38.9           169
    Finger(s)...........................................          720           617           37.9           234
    Upper extremities, multiple.........................            0             0            0.0             0
    Trunk, unspecified..................................            0             0         \6\ NE             0
    Abdomen.............................................           88            75            0.0             0
    Back, Unspecified...................................          954           817            0.0             0
    Back, lumbar........................................        1,198         1,026            0.0             0
    Back, thoracic......................................          168           144            0.0             0
    Chest...............................................          289           247            5.3            13
    Hip.................................................          306           262            0.0             0
    Shoulder(s).........................................          601           515            0.0             0
    Trunk, Multiple parts...............................            0             0            0.0             0
    Lower extremities, multiple.........................            0             0            0.0             0
    Leg(s), unspecified.................................           59            51            0.0             0
    Thighs..............................................           89            76            0.0             0
    Knee(s).............................................        1,073           919            0.0             0
    Lower leg(s)........................................          123           105            0.0             0
    Leg(s), multiple....................................            0             0            0.0             0
    Ankle(s)............................................          624           534            0.0             0
    Foot/feet...........................................          488           418           60.0           251
    Toe(s)..............................................          123           105           90.0            95
    Lower extremities, multiple.........................            0             0            0.0             0
    Multiple body parts.................................          674           577            0.0             0
Lost workday injuries continued:                                                                                
    Circulatory system..................................            0             0            0.0             0
    Digestive system....................................            0             0          \7\NE             0
    Excretory system....................................            0             0            0.0             0
    Nervous system......................................            0             0            0.0             0
    Respiratory system..................................            0             0            0.0             0
    Body parts, NEC.....................................          163           140          \7\NE             0
    Unclassifiable......................................          720           617            0.0             0
                                                         -------------------------------------------------------
      Total lost-workday injury.........................       11,533         9,876           15.7         1,549
All injuries and Illnesses..............................       43,433        37,193           38.2        14,214
----------------------------------------------------------------------------------------------------------------
\1\ Bureau of Labor Statistics. 1992 Survey of Occupational Injuries and Illnesses.                             
\2\ Bureau of Labor Statistics. 1992 Survey of Occupational Injuries and Illnesses, unpublished data. Injury and
  illness data by body part available only for cases with lost workdays.                                        
\3\ Estimates of the number of 1992 injuries and illnesses extrapolated to 1994 based on decline in shipyard    
  employment of 14.4 percent over this period.                                                                  
\4\ OSHA estimates based on analysis of Form 200 Shipyard Injury Database. Estimate of preventable share for non
  lost-workday injuries based on the overall ratio of preventable non-lost-workday cases in the Form 200        
  database.                                                                                                     
\5\ Rate for eye injuries preventable by safety glasses adjusted downward by 50.0% due to current high rate of  
  safety glass use in shipyards.                                                                                
\6\ OSHA estimate. No observations for this injury category in Form 200 database.                               

Regulatory Alternatives

    The Agency concludes that the proposed rule is the most cost-
effective regulatory alternative for this industry. One alternative 
considered was to apply the general industry PPE standard to the 
shipyard industry. However, if the general industry PPE standard (29 
CFR 1910.132) were applied to the shipyard industry in its entirety, it 
would impose unnecessary costs in the form of paperwork because it 
could require shipyards to adopt new training and documentation 
programs. Shipyards have long had both comprehensive and specialized 
safety programs and their own databases for maintaining training logs, 
accident data, and other information. The final rule builds on the 
tools the industry has already developed and thus avoids imposing 
unnecessary costs and other burdens on shipyard employers.

Regulatory Flexibility

    As required by the Regulatory Flexibility Act of 1980 (as amended 
by Title II, Subtitle D of the Contract with America Advancement Act of 
1996),

[[Page 26344]]

OSHA assessed the economic burden faced by small establishments in 
complying with this final rule. In comments to the record for this 
standard, no comments specifically addressed either the Regulatory 
Flexibility Analysis or its conclusion that the standard would impose 
no significant impact on small firms. In that analysis, the Agency 
identified the increased use of respirators as the main source of new 
costs for all shipyards, but this element has been dropped in the final 
standard.
    The Agency has concluded that small shipyards in the industry have 
as much need of additional personal protective equipment as other 
shipyards. The industry has one of the highest injury and illness rates 
of any industry. Since the largest shipyards report injury and illness 
rates at or below the industry average, the Agency has concluded that 
the rate of preventable injuries and illnesses are at least as great in 
smaller yards. In addition, many of the production operations are the 
same for larger and smaller shipyards. Since the standard requires 
employers to identify and protect workers from risk by occupation or 
trade, the Agency concludes that the risks for each trade are similar 
irrespective of the size of the shipyard. The objectives of the 
standard are to reduce the risk of PPE-preventable injuries in 
shipyards.
    Although no public comments were specifically addressed to issues 
in the Regulatory Flexibility Analysis, many of the comments applied to 
situations faced by smaller shipyards. However, the Agency believes 
that smaller yards are not impacted in a significantly different manner 
or scale than larger shipyards. The comments by smaller shipyards about 
feasibility were similar to the larger yards: questioning the utility 
of body harnesses rather than body belts and the need to certify hazard 
assessments and training.
    The Agency considered applying the General Industry PPE standard as 
an alternative for small establishments in the shipyard industry, but 
testimony and comments in the docket support the Agency's decision that 
the final standard will more effectively meet the risk in shipyards at 
lowest cost.
    As can be seen in Table 3, the Agency estimates that there are 200 
firms in the shipyard industry with 10 or fewer employees, 100 firms 
with 11-20 employees, and 100 firms with 21-99 employees. The Agency 
believes that for the shipyard industry, firms with fewer than 100 
employees is a ``small'' firm. Therefore, for purposes of this 
Regulatory Flexibility Analysis, the Agency estimates that there are 
approximately 400 ``smaller'' businesses with an estimated 8,000 
employees. From data in Table 3, smaller firms will require 525 
management hours to document hazard assessments, 250 management hours 
to develop training for body harnesses, and 250 management hours to 
provide training, and 550 employee hours for training. Costs for these 
elements, which are a one-time cost, total $38,450, which is equivalent 
to an $8,700 annual cost (annualized over 5 years at 7 percent). Other 
new annual costs for small firms are estimated at $13,500 for 500 body 
harnesses to replace body belts. Total annual costs for smaller 
shipyards are then an estimated $22,200, or an average of about $55 per 
smaller shipyard. The Agency has provided a phase-in period of two 
years to allow smaller shipyards time to accomplish this shift.
    OSHA concludes that this standard will not impose a significant 
impact on a substantial number of small entities, and that the phase-in 
for body harnesses will further alleviate any impacts that do occur.

International Trade

    In accordance with Executive Order 12866, OSHA assessed the effects 
of the final standard on international trade. The shipyard industry 
actively competes with foreign shipyards for ship repair and 
shipbuilding orders. If this OSHA regulation significantly increased 
the price of products and services of domestic shipyards, foreign 
shipyards could benefit. OSHA believes, however, that there will be 
virtually no effect on the prices of products or services as a result 
of this regulation.

Environmental Impact

    The shipyard PPE standard has been reviewed in accordance with the 
requirements of the National Environmental Policy Act (NEPA) of 1969 
(42 U.S.C. 4321 et seq.), the regulations of the Council on 
Environmental Quality (CEQ) (40 CFR part 1500), and DOL NEPA Procedures 
(29 CFR part 11). There will be no additional incremental release 
quantities related to this standard. Releases of substances regulated 
under EPA's SARA Title III or EPA NESHAP standards are subject to 
reporting and control requirements.

Non-Regulatory Alternatives

    The primary objective of OSHA's standard for PPE is to minimize the 
number of shipyard employee injuries and risk of fatalities. The Agency 
examined non-regulatory approaches for promoting PPE use, including (1) 
incentives created by workers' compensation programs or the threat of 
private suits, and (2) requirements of the U.S. Navy and U.S. Coast 
Guard. Following this review, OSHA determined that the need for 
government regulation arises from the significant risk of job-related 
injury or death. Private markets fail to provide enough safety and 
health resources due to the externalization of part of the social cost 
of worker injuries and deaths. Workers' compensation systems do not 
offer an adequate remedy because premiums do not reflect specific 
workplace risk and liability claims are restricted by statutes 
preventing employees from suing their employers. The U.S. Navy and U.S. 
Coast Guard require shipyards to follow safe procedures when performing 
work for them or when constructing merchant vessels; however, most 
firms do not come under this scrutiny. Thus, OSHA has determined that a 
federal standard is necessary.

References

1. U.S. Department of Commerce. International Trade Administration. 
1994 U.S. Industrial Outlook.
2. U.S. Department of Transportation. Maritime Administration. 
Report on Survey of U.S. Shipbuilding and Repair Facilities, 1990.
3. U.S. Department of Commerce. Bureau of the Census. Preliminary 
Report Industry Service 1987 Census of Manufactures: Shipbuilding 
and Repairing (Industry 3731). Washington, D.C.: Government Printing 
Office, 1990.
4. U.S. Department of Commerce. Bureau of the Census. Preliminary 
Report Industry Service 1987 Census of Manufactures: Shipbuilding 
and Repairing (Industry 3731). Washington, D.C.: Government Printing 
Office, 1989.
5. CONSAD Research Corp. Data to Support a Regulatory Analysis of 
the Proposed Standard for Shipbuilding and Repairing. Final Report. 
Prepared for the U.S. Department of Labor, Occupational Safety and 
Health Administration, under Contract No. J-9-F-4-0024. Pittsburgh: 
CONSAD, November 1985.
6. CONSAD Research Corp. Data to Support A Regulatory Analysis of 
the Proposed Standard for Shipbuilding and Repairing: Subpart B. 
Prepared for the U.S. Department of Labor, Occupational Safety and 
Health Administration, under Contract No. J-9-F-4-0024. Pittsburgh: 
CONSAD, June 1986.
7. Commission on Merchant Marine and Defense. First Report of the 
Commission of Merchant Marine and Defense, Appendices. Washington, 
D.C., September 30, 1987.
8. Dun and Bradstreet Financial Data. 1989, 1991, 1994.
9. Bureau of Labor Statistics, Employment and Earnings, May, 1995.

[[Page 26345]]

10. Executive Office of the President. OMB. Standard Industrial 
Classification Manual. 1987.
11. Main Hurdman/KGM. Profile of the Shipbuilding and Repairing 
Industry. Prepared for the U.S. Department of Labor, Occupational 
Safety and Health Administration. Washington, D.C., October 1984. 62 
Pp.
12. Shipyard Council of America. ``Merchant Shipbuilding'' 
September, 1987; ``Naval Shipbuilding'' January, 1992; ``Ship 
Construction Report'' July, 1991.
13. American Waterways Shipyard Conference. 1989 and 1992 Annual 
Shipyard Survey. Arlington, Va.
14. Bureau of Labor Statistics, Occupational Injuries and Illnesses 
in the U.S. by Industry 1992.
15. Sulowski, Andrew, ``Selecting Fall Arresting Systems,'' National 
Safety News, Oct. 1979.
16. Hearon, Bernard F. and Brinkley, James W., ``Fall Arrest and 
Post-Fall Suspension: Literature Review and Direction for Further 
Research,'' Air Force Aerospace Medical Research Laboratory, 
Aerospace Medical Division, Air Force Systems Command, Wright-
Patterson Air Force Base, Ohio.
17. United States Technical Advisory Group, Ex. 9-33 submitted to 
the Powered Platform rulemaking, Docket S-700A.

V. Paperwork Reduction Act

    The Agency has estimated the paperwork burden of the shipyard PPE 
standard under the guidelines of the Paperwork Reduction Act of 1995. 
Under that Act, burden is defined as the total time, effort, or 
financial resources expended by persons to generate, maintain, retain, 
or disclose or provide information to or for a Federal Agency. The 
Agency has concluded that the following elements of the shipyard PPE 
standard potentially could create a paperwork burden for the shipyard 
industry:
For hazard assessments:
    performing a hazard assessment for each trade; documenting the 
hazard assessment;
For PPE training:
    developing training materials (or programs for PPE; training 
employees;
    documenting employee training.
For personal fall arrest system training:
    developing a training program; training employees.

For positioning device systems training:
    developing a training program; training employees.

    For most of these potential sources of burden, shipyards are 
already performing these information collection or disclosure 
functions. For these elements, the final rule will not therefore 
require shipyards to expend additional resources on paperwork.
    The Agency has concluded that only new burdens imposed specifically 
by new or revised provisions of a standard should be considered 
paperwork burdens attributable to that standard. In other words, it 
would be inappropriate to count as the burden actions that firms in the 
regulated community have already undertaken voluntarily.
    The record shows that shipyards are already complying with all of 
the paperwork burden elements listed above, except for documenting 
hazard assessments, developing training for personal fall arrest 
systems (body harnesses), and providing training to employees for 
personal fall arrest systems. Among large shipyards, only Newport News 
Shipbuilding (NNS) reported that it relies primarily on body belts 
rather than body harnesses.
    The hazard assessment documentation required by the standard 
consists of a record, either paper or on a computer or other storage 
medium, with the date of the hazard assessment, name of person 
performing the assessment, occupation or operations covered, and a list 
of the PPE required. Shipyards report that they already incorporate 
some of this information in their current training materials. The 
Agency has estimated that it would take each shipyard about an hour to 
develop a computer- based record format for this documentation and 
approximately five minutes to record the hazard assessment for each 
occupation covered. Table 6 summarizes this information for the PPE 
standard.
    Development of training materials for the use of personal fall 
arrest systems (body harnesses) is the second potential burden element. 
All large shipyards report that they already use harnesses to some 
extent. Because training videos and written materials on the use of 
body harnesses are widely available, the Agency has concluded that the 
time required for establishing such a training program will be small. 
Table 6 presents the Agency's estimate of the time that firms will 
expend to develop training for the use of body harnesses; the estimate 
ranges from 8 hours for firms with more than 500 employees to 2 hours 
for the smallest employers.
    Firms that do not currently use body harnesses must also train 
their employees as harnesses are substituted over time for body belts. 
The paperwork burden of this training consists of management or 
trainers' time to provide training to employees. The Agency estimates a 
training session will take approximately one hour and that as many as 
10 to 20 employees can receive training in a single session. Table 6 
presents the Agency's estimate of the number of sessions by firm size 
that will be necessary for training in body harnesses. The Agency 
estimates that a higher fraction (10 percent or more) of smaller firms' 
employees will have to be trained due to the nature of their business--
cleaning tanks, repairs over the ship's side, painting and 
maintenance--which require the use of harnesses. Among large firms, 
only NNS reported that they used very few harnesses. The Agency 
estimates that all of NNS's body belts (4,700) will not have to be 
replaced with harnesses, since relatively less work at large shipyards 
and new ship construction require a body harness (rather than a body 
belt). The Agency has estimated that NNS will replace 3,000 body belts 
with harnesses. Data for the paperwork burden of providing training to 
employees are also presented in Table 6.

 Table 6.--Estimate of Burden Hours to Document Hazard Assessments, to Develop Training Programs for Body Hamesses, and to Train in Use of Body Hamesses
                                                      for OSHA's page Standard on PPE in Shipyards.                                                     
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                           Hazard assessment        Develop training for hamessess        Training      
                                                                     -----------------------------------------------------------------------------------
                                                           Number of                    Time of       Time                                              
             Firm size [number of employees]                firms in    Number of      document     develop   Number of    Total     Training   Time to 
                                                              size        hazard        hazard      training  firms who   time to    sessions    train  
                                                            category   assessments   assessment's   per firm   must do    develop    per firm   [hours] 
                                                                      [occupations]     [hours]     [hours]       so      program                       
--------------------------------------------------------------------------------------------------------------------------------------------------------
1000+....................................................         12           40             36   .........          0          0        150        150
500-999..................................................         12           30             30           8          6         48          4         24
100-499..................................................         76           30            190           4         76        304          2        152
21-99....................................................        100           10            150           4        100        400          1        100

[[Page 26346]]

                                                                                                                                                        
11-20....................................................        100            5            125           2         50        100          1         50
1-10.....................................................        200            5            250           2        100        200          1        100
                                                          ----------------------------------------------------------------------------------------------
      Subtotals (hours)..................................  .........  .............          781   .........  .........       1052  .........        576
                                                          ==============================================================================================
Total estimated burden (first-year, one-time)............  .........  .............  ............  .........  .........  .........  .........  \1\ 2,409
Estimated annual burden 300 hours.                                                                                                                      
--------------------------------------------------------------------------------------------------------------------------------------------------------
Source: OSHA's Office of Regulatory Analysis.                                                                                                           
                                                                                                                                                        
\1\ Hours.                                                                                                                                              

    The Agency estimates that the shipyard PPE standard will result in 
about 2,409 paperwork burden hours being imposed on the shipyard 
industry the first year, most of it due to developing training 
materials in the use of body harnesses. However, these 2,409 hours are 
only an estimate of the first-year burden, a one-time claim on 
resources, not an annual burden. The future annual burden beginning in 
the second year, is estimated to be approximately 300 hours per year, 
which represents managers' time to train new employees resulting from 
employee turnover in firms not currently training employees in the use 
of harnesses.
Collections of Information: Request for Comments
    The Department of Labor, as part of its continuing effort to reduce 
paperwork and respondent burden, conducts a preclearance consultation 
program to provide the general public and Federal agencies with an 
opportunity to comment on proposed and/or continuing collections of 
information in accordance with the Paperwork Reduction Act of 1995 
(PRA95)(44 U.S.C. 3506(c)(2)(A)). This program helps to ensure that 
requested data can be provided in the desired format, reporting burden 
(time and financial resources) is minimized, collection instruments are 
clearly understood, and the impact of collection requirements on 
respondents can be properly assessed. Currently, OSHA is soliciting 
comments concerning the proposed approval for the paperwork 
requirements of 29 CFR 1915, subpart I, Personal Protective Equipment 
for Shipyard Employment (PPE). Written comments should:
     Evaluate whether the proposed collection of information is 
necessary for the proper performance of the functions of the agency, 
including whether the information will have practical utility;
     Evaluate the accuracy of the agency's estimate of the 
burden of the proposed collection of information, including the 
validity of the methodology and assumptions used;
     Enhance the quality, utility, and clarity of the 
information to be collected; and
     Minimize the burden of the collection of information on 
those who are to respond, including through the use of appropriate 
automated, electronic, mechanical, or other technological collection 
techniques or other forms of information technology, e.g., permitting 
electronic submissions of responses.
Background
    OSHA in its final rule for Personal Protective Equipment in 
Shipyard Employment is including two types of information collections. 
The first is a requirement for the employer to conduct a hazard 
assessment relative to PPE selection, and the second involves training 
requirements for PPE.
    OSHA believes that the information collection and documentation of 
the hazard assessment as outlined in the final standard is necessary so 
that situations where PPE should be used for employee protection can be 
identified, and the proper PPE selected. In addition, OSHA believes 
that the training requirements and documentation in the final standard 
are essential in providing employees with the information and practical 
knowledge needed to effectively use PPE. Documentation can be used by 
the employer to ensure that all of its employees using PPE are properly 
trained.
Current Actions
    This notice requests OMB approval of the paperwork requirements in 
Personal Protective Equipment for Shipyard Employment (29 CFR 1915, 
Subpart I).
    Type of Review: New.
    Agency: Occupational Safety and Health Administration, U.S. 
Department of Labor.
    Title: Personal Protective Equipment for Shipyard Employment (29 
CFR 1915, subpart I).
    OMB Number: 1218-AA74
    Agency: Docket No. S-045.
    Frequency: On occasion.
    Affected Public: Business or other for-profit, Federal government, 
State and Local governments.
    Number of respondents: 500.
    Estimated Time Per Respondent: Varies.
    Total Estimated Cost: $72,270 (First year only), $9,000 annual.
    Total Burden Hours: 2,409 (First year only), 300 annual, recurring.
    Comments submitted in response to this notice will be summarized 
and/or included in the request for Office of Management and Budget 
approval of the information collection request: they will also become a 
matter of public record.

VI. Statutory Considerations
Introduction
    OSHA has described PPE-related hazards and the measures required to 
protect affected employees from those hazards in Section I, Background; 
Section II, Hazards Involved; and Section III, Summary and Explanation 
of the Final Rule, above. The Agency is providing the following 
discussion of the statutory mandate for OSHA rulemaking activity to 
explain the legal

[[Page 26347]]

basis for its determination that the revised shipyard PPE standard, as 
promulgated, is reasonably necessary to protect affected employees from 
significant risks of injury and death.
    Section 2(b)(3) of the Occupational Safety and Health Act 
authorizes ``the Secretary of Labor to set mandatory occupational 
safety and health standards applicable to businesses affecting 
interstate commerce'', and section 5(a)(2) provides that ``[each] 
employer shall comply with occupational safety and health standards 
promulgated under this Act'' (emphasis added). Section 3(8) of the OSH 
Act (29 U.S.C. Sec. 652(8)) provides that ``the term `occupational 
safety and health standard' means a standard which requires conditions, 
or the adoption or use of one or more practices, means, methods, 
operations, or processes, reasonably necessary or appropriate to 
provide safe or healthful employment and places of employment.''
    In two recent cases, reviewing courts have expressed concern that 
OSHA's interpretation of these provisions of the OSH Act, particularly 
of section 3(8) as it pertains to safety rulemaking, could lead to 
overly costly or under-protective safety standards. In International 
Union, UAW v. OSHA, 938 F.2d 1310 (D.C. Cir. 1991), the District of 
Columbia Circuit rejected substantive challenges to OSHA's lockout/
tagout standard and denied a request that enforcement of that standard 
be stayed, but it also expressed concern that OSHA's interpretation of 
the OSH Act could lead to safety standards that are very costly and 
only minimally protective. The reviewing court conducted further 
proceedings and subsequently held that the OSH Act provides adequate 
constraints on the exercise of OSHA's regulatory authority (938 F.3d 
1310, D.C. Cir. 1994).
    In National Grain & Feed Ass'n v. OSHA, 866 F.2d 717 (5th Cir. 
1989), the Fifth Circuit concluded that Congress gave OSHA considerable 
discretion in structuring the costs and benefits of safety standards 
but, concerned that the grain dust standard might be under-protective, 
directed OSHA to consider adding a provision that might further reduce 
significant risk of fire and explosion.
    OSHA rulemakings involve a significant degree of agency expertise 
and policy-making discretion to which reviewing courts must defer. 
(See, for example, Building & Constr. Trades Dep't, AFL-CIO v. Brock, 
838 F.2d 1258, 1266 (D.C. Cir. 1988); Industrial Union Dep't, AFL-CIO 
v. American Petroleum Inst., 448 U.S. 607, 655 n. 62 (1980).) At the 
same time, the Agency's technical expertise and policy-making authority 
must be exercised within discernable limits. The lockout/tagout and 
grain handling standard decisions sought clarification of the Agency's 
view of the scope of its expertise and authority. In light of those 
decisions, the preamble to this safety standard states OSHA's views 
regarding the limits of its safety rulemaking authority and explains 
why the Agency is confident that its interpretive views have in the 
past avoided regulatory extremes and continue to do so in this rule.
    Stated briefly, the OSH Act requires that, before promulgating any 
occupational safety standard, OSHA demonstrate based on substantial 
evidence in the record as a whole that: (1) the proposed standard will 
substantially reduce a significant risk of material harm; (2) 
compliance is technologically feasible in the sense that the protective 
measures being required already exist, can be brought into existence 
with available technology, or can be created with technology that can 
reasonably be developed; (3) compliance is economically feasible in the 
sense that industry can absorb or pass on the costs without major 
dislocation or threat of instability; and (4) the standard is cost 
effective in that it employs the least expensive protective measures 
capable of reducing or eliminating significant risk. Additionally, 
proposed safety standards must be compatible with prior Agency action, 
must be responsive to significant comment in the record, and, to the 
extent allowed by statute, must be consistent with applicable Executive 
Orders. These elements limit OSHA's regulatory discretion for safety 
rulemaking and provide a decision-making framework for developing a 
rule.
    A. Congress concluded that OSHA regulations are necessary to 
protect workers from occupational hazards and that employers should be 
required to reduce or eliminate significant workplace health and safety 
threats. At section 2(a) of the OSH Act (29 U.S.C. Sec. 651(a)), 
Congress announced its determination that occupational injury and 
illness should be eliminated as much as possible: ``The Congress finds 
that occupational injury and illness arising out of work situations 
impose a substantial burden upon, and are a hindrance to, interstate 
commerce in terms of lost production, wage loss, medical expenses, and 
disability compensation payments.'' Congress therefore declared ``it to 
be its purpose and policy * * * to assure so far as possible every 
working man and woman in the Nation safe * * * working conditions [29 
U.S.C. Sec. 651(b)].''
    To that end, Congress instructed the Secretary of Labor to adopt 
existing federal and consensus standards during the first two years 
after the OSH Act became effective and, in the event of conflict among 
any such standards, to ``promulgate the standard which assures the 
greatest protection of the safety or health of the affected employees 
[29 U.S.C. Sec. 655(a)].'' Congress also directed the Secretary to set 
mandatory occupational safety standards [29 U.S.C. Sec. 651(b)(3)], 
based on a rulemaking record and substantial evidence [29 U.S.C. 
Sec. 655(b)(2)], that are ``reasonably necessary or appropriate to 
provide safe * * * employment and places of employment.'' When 
promulgating permanent safety or health standards that differ from 
existing national consensus standards, the Secretary must explain ``why 
the rule as adopted will better effectuate the purposes of this Act 
than the national consensus standard [29 U.S.C. Sec. 655(b)(8)].'' 
Correspondingly, every employer must comply with OSHA standards and, in 
addition, ``furnish to each of his employees employment and a place of 
employment which are free from recognized hazards that are causing or 
are likely to cause death or serious physical harm to his employees [29 
U.S.C. Sec. 654(a)].''
    ``Congress understood that the Act would create substantial costs 
for employers, yet intended to impose such costs when necessary to 
create a safe and healthful working environment. Congress viewed the 
costs of health and safety as a cost of doing business * * *. Indeed, 
Congress thought that the financial costs of health and safety problems 
in the workplace were as large as or larger than the financial costs of 
eliminating these problems [American Textile Mfrs. Inst. Inc. v. 
Donovan, 452 U.S. 490, 519-522 (1981) (ATMI); emphasis was supplied in 
original].'' ``[T]he fundamental objective of the Act [is] to prevent 
occupational deaths and serious injuries [Whirlpool Corp. v. Marshall, 
445 U.S. 1, 11 (1980)].'' ``We know the costs would be put into 
consumer goods but that is the price we should pay for the 80 million 
workers in America [S. Rep. No. 91-1282, 91st Cong., 2d Sess. (1970); 
H.R. Rep. No. 91-1291, 91st Cong., 2d Sess. (1970), reprinted in Senate 
Committee on Labor and Public Welfare, Legislative History of the 
Occupational Safety and Health Act of 1970, (Committee Print 1971) 
(``Leg. Hist.'') at 444 (Senator Yarborough)].'' ``Of course, it will 
cost a little more per item to produce a washing machine. Those of us 
who use

[[Page 26348]]

washing machines will pay for the increased cost, but it is worth it, 
to stop the terrible death and injury rate in this country [Id. at 324; 
see also 510-511, 517].''

    [T]he vitality of the Nation's economy will be enhanced by the 
greater productivity realized through saved lives and useful years 
of labor.
    When one man is injured or disabled by an industrial accident or 
disease, it is he and his family who suffer the most immediate and 
personal loss. However, that tragic loss also affects each of us. As 
a result of occupational accidents and disease, over $1.5 billion in 
wages is lost each year [1970 dollars], and the annual loss to the 
gross national product is estimated to be over $8 billion. Vast 
resources that could be available for productive use are siphoned 
off to pay workmen's compensation and medical expenses * * *.
    Only through a comprehensive approach can we hope to effect a 
significant reduction in these job death and casualty figures. [Id. 
at 518-19 (Senator Cranston)]

    Congress considered uniform enforcement crucial because it would 
reduce or eliminate the disadvantage that a conscientious employer 
might experience where inter-industry or intra-industry competition is 
present. Moreover, ``many employers--particularly smaller ones--simply 
cannot make the necessary investment in health and safety, and survive 
competitively, unless all are compelled to do so [Leg. Hist. at 144, 
854, 1188, 1201].''
    Thus, the statutory text and legislative history make clear that 
Congress conclusively determined that OSHA regulation is necessary to 
protect workers from occupational hazards and that employers should be 
required to reduce or eliminate significant workplace health and safety 
threats.
    B. As construed by the courts and by OSHA, the OSH Act sets clear 
and reasonable limits for Agency rulemaking action. OSHA has long 
followed the teaching that section 3(8) of the OSH Act requires that, 
before it promulgates ``any permanent health or safety standard, [it 
must] make a threshold finding that a place of employment is unsafe--in 
the sense that significant risks are present and can be eliminated or 
lessened by a change in practices [Industrial Union Dep't, AFL-CIO v. 
American Petroleum Inst., 448 U.S. 607, 642 (1980) (plurality) 
(Benzene); emphasis was supplied in original].'' Thus, the national 
consensus and existing federal standards that Congress instructed OSHA 
to adopt summarily within two years of the OSH Act's inception provide 
reference points concerning the least an OSHA standard should achieve 
(29 U.S.C. Sec. 655(a)). As a result, OSHA is precluded from regulating 
insignificant risks or from issuing standards that do not at least 
lessen risk in a significant way.
    The OSH Act also limits OSHA's discretion to issue overly 
burdensome rules, as the Agency also has long recognized that ``any 
standard that was not economically or technologically feasible would a 
fortiori not be `reasonably necessary or appropriate' under the Act. 
See Industrial Union Dep't v. Hodgson, [499 F.2d 467, 478 (D.C. Cir. 
1974)] (`Congress does not appear to have intended to protect employees 
by putting their employers out of business.') [American Textile Mfrs. 
Inst. Inc., 452 U.S. at 513 n. 31 (a standard is economically feasible 
even if it portends `disaster for some marginal firms,' but it is 
economically infeasible if it `threaten[s] massive dislocation to, or 
imperil[s] the existence of,' the industry)].''
    By stating the test in terms of ``threat'' and ``peril,'' the 
Supreme Court made clear in ATMI that economic unfeasibility begins 
short of industry-wide bankruptcy. OSHA itself has placed the line 
considerably below this level. (See for example, ATMI, 452 U.S. at 527 
n. 50; 43 FR 27,360 (June 23, 1978). Proposed 200 g/m\3\ PEL 
for cotton dust did not raise serious possibility of industry-wide 
bankruptcy, but impact on weaving sector would be severe, possibly 
requiring reconstruction of 90 percent of all weave rooms. OSHA 
concluded that the 200 g/m\3\ level was not feasible for 
weaving and that 750 g/m\3\ was all that could reasonably be 
required). See also 54 FR 29,245-246 (July 11, 1989); American Iron & 
Steel Institute, 939 F.2d at 1003. OSHA raised engineering control 
level for lead in small nonferrous foundries to avoid the possibility 
of bankruptcy for about half of small foundries even though the 
industry as a whole could have survived the loss of small firms.) All 
OSHA standards must also be cost-effective in the sense that the 
protective measures being required must be the least expensive measures 
capable of achieving the desired end (ATMI, at 514 n. 32; Building and 
Constr. Trades Dep't, AFL-CIO v. Brock, 838 F.2d 1258, 1269 (D.C. Cir. 
1988)). OSHA gives additional consideration to financial impact in 
setting the period of time that should be allowed for compliance, 
allowing as much as ten years for compliance phase-in. (See United 
Steelworkers of Am. v. Marshall, 647 F.2d 1189, 1278 (D.C. Cir. 1980), 
cert. denied, 453 U.S. 913 (1981).) Additionally, OSHA's enforcement 
policy takes account of financial hardship on an individualized basis. 
OSHA's Field Inspection Reference Manual provides for setting a 
``reasonable abatement date,'' based on careful consideration of an 
employer's particular circumstances, by which time a violation must be 
corrected (CPL. 2.103, Chapter IV, paragraph A2, September 26, 1994).
    To reach the necessary findings and conclusions, OSHA conducts 
rulemaking in accordance with the requirements of section 6 of the OSH 
Act. The rulemaking process enables the Agency to determine the 
qualitative and, if possible, the quantitative nature of the risk with 
(and without) regulation, the technological feasibility of compliance, 
the industry's profit history, the industry's ability to absorb costs 
or pass them on to the consumer, the impact of higher costs on demand, 
and the impact on competition with substitutes and imports. (See ATMI 
at 2501-2503; American Iron & Steel Institute generally.) Section 6(f) 
of the OSH Act further provides that, if the validity of a standard is 
challenged, OSHA must support its conclusions with ``substantial 
evidence in the record considered as a whole,'' a standard that courts 
have determined requires fairly close scrutiny of agency action and the 
explanation of that action. (See Steelworkers, 647 F.2d at 1206-1207.)
    OSHA's powers are further circumscribed by the independent 
Occupational Safety and Health Review Commission, which provides a 
neutral forum for employer contests of citations issued by OSHA for 
noncompliance with health and safety standards (29 U.S.C. Secs. 659-
661; noted as an additional constraint in Benzene at 652 n. 59). OSHA 
must also respond rationally to similarities and differences among 
industries or industry sectors. (See Building and Constr. Trades Dep't, 
AFL-CIO v. Brock, 838 F.2d 1258, 1272-73 (D.C. Cir. 1988).)
    OSHA rulemaking is thus constrained first by the need to 
demonstrate that the standard will substantially reduce a significant 
risk of material harm, and then by the requirement that compliance is 
technologically capable of being done and not so expensive as to 
threaten economic instability or dislocation for the industry. Within 
these bounds, further constraints such as the need to find cost-
effective measures and to respond rationally to all meaningful comment 
militate against regulatory extremes.
    D. The revised PPE standard complies with the statutory criteria 
described above and is not subject to the additional constraints 
applicable to section 6(b)(5) standards.

[[Page 26349]]

    Standards which regulate hazards that are frequently undetectable 
because they are subtle or develop slowly or after long latency 
periods, are frequently referred to as ``health'' standards. Standards 
that regulate hazards, such as falls, explosions or electrocutions, 
that cause immediately noticeable physical harm, are called ``safety'' 
standards. (See National Grain & Feed Ass'n v. OSHA (NGFA II), 866 F.2d 
717, 731, 733 (5th Cir. 1989). As noted above, section 3(8) provides 
that all OSHA standards must be ``reasonably necessary or 
appropriate.'' In addition, section 6(b)(5) requires that OSHA set 
health standards which limit significant risk ``to the extent 
feasible.'' OSHA has determined that the revised PPE standard is a 
safety standard, because the revised standard addresses hazards, such 
as flying particles, molten metal, electric shock, falling objects and 
falls from elevations that are immediately dangerous to life or health, 
not the longer term, less obvious hazards subject to section 6(b)(5).
    The OSH Act and its legislative history clearly indicate that 
Congress intended for OSHA to distinguish between safety standards and 
health standards. For example, in section 2(b)(6) of the OSH Act, 
Congress declared that the goal of assuring safe and healthful working 
conditions and preserving human resources would be achieved, in part:

    * * * by exploring ways to discover latent diseases, 
establishing causal connections between diseases and work in 
environmental conditions, and conducting other research relating to 
health problems, in recognition of the fact that occupational health 
standards present problems often different from those involved in 
occupational safety.
    The legislative history makes this distinction even clearer:
    [The Secretary] should take into account that anyone working in 
toxic agents and physical agents which might be harmful may be 
subjected to such conditions for the rest of his working life, so 
that we can get at something which might not be toxic now, if he 
works in it a short time, but if he works in it the rest of his life 
might be very dangerous; and we want to make sure that such things 
are taken into consideration in establishing standards. [Leg. Hist. 
at 502-503 (Sen. Dominick), quoted in Benzene at 648-49]

    Additionally, Representative Daniels distinguished between 
``insidious 'silent killers' such as toxic fumes, bases, acids, and 
chemicals'' and ``violent physical injury causing immediate visible 
physical harm'' (Leg. Hist. at 1003), and Representative Udall 
contrasted insidious hazards like carcinogens with ``the more visible 
and well-known question of industrial accidents and on-the-job injury'' 
(Leg. Hist. at 1004). (See also, for example, S. Rep. No. 1282, 91st 
Cong., 2d Sess 2-3 (1970), U.S. Code Cong. & Admin. News 1970, pp. 
5177, 5179, reprinted in Leg. Hist. at 142-43, discussing 1967 Surgeon 
General study that found that 65 percent of employees in industrial 
plants ``were potentially exposed to harmful physical agents, such as 
severe noise or vibration, or to toxic materials''; Leg. Hist. at 412; 
id. at 446; id. at 516; id. at 845; International Union, UAW at 1315.)
    In reviewing OSHA rulemaking activity, the Supreme Court has held 
that section 6(b)(5) requires OSHA to set ``the most protective 
standard consistent with feasibility'' (Benzene at 643 n. 48). As 
Justice Stevens observed:

    The reason that Congress drafted a special section for these 
substances * * * was because Congress recognized that there were 
special problems in regulating health risks as opposed to safety 
risks. In the latter case, the risks are generally immediate and 
obvious, while in the former, the risks may not be evident until a 
worker has been exposed for long periods of time to particular 
substances. [Benzene, at 649 n. 54.]

    Challenges to the grain dust and lockout/tagout standards included 
assertions that grain dust in explosive quantities and uncontrolled 
energy releases that could expose employees to crushing, cutting, 
burning or explosion hazards were harmful physical agents so that OSHA 
was required to apply the criteria of section 6(b)(5) when determining 
how to protect employees from those hazards. Reviewing courts have 
uniformly rejected such assertions. For example, the Court in 
International Union, UAW v. OSHA, 938 F.2d 1310 (D.C. Cir. 1991) 
rejected the view that section 6(b)(5) provided the statutory criteria 
for regulation of uncontrolled energy, holding that such a ``reading 
would obliterate a distinction that Congress drew between `health' and 
`safety' risks.'' The Court also noted that the language of the OSH Act 
and the legislative history supported the OSHA position (International 
Union, UAW at 1314). Additionally, the Court stated: ``We accord 
considerable weight to an agency's construction of a statutory scheme 
it is entrusted to administer, rejecting it only if unreasonable'' 
(International Union, UAW at 1313, citing Chevron U.S.A., Inc. v. NRDC, 
467 U.S. 837, 843 (1984)).
    The Court reviewing the grain dust standard also deferred to OSHA's 
reasonable view that the Agency was not subject to the feasibility 
mandate of section 6(b)(5) in regulating explosive quantities of grain 
dust (National Grain & Feed Association v. OSHA (NGFA II), 866 F.2d 
717, 733 (5th Cir. 1989)). It therefore applied the criteria of section 
3(8), requiring the Agency to establish that the standard is 
``reasonably necessary or appropriate'' to protect employee safety.
    As explained in Section I, Background, Section III, Summary and 
Explanation of the Standard, and in Section VI, Summary of the Final 
Economic Analysis and Regulatory Flexibility Analysis, above, OSHA has 
determined that the failure to protect employees from PPE-related 
hazards poses significant risks to employees and that the provisions of 
the final rule are reasonably necessary to protect affected employees 
from those risks. The Agency estimates that compliance with the revised 
PPE standard will cost $163,000 annually and will reduce the risk of 
the identified hazards, preventing 14,200 injuries annually (of which 
1,550 would be lost workday injuries and 12,650 would be non-lost 
workday injuries). This constitutes a substantial reduction of 
significant risk of material harm for the exposed population of 
approximately 79,000 shipyard production employees.
    The rulemaking record indicates that the measures required by the 
standard are already in general use throughout the shipyard industry. 
In addition, OSHA believes that compliance is economically feasible as 
documented in the Economic Analysis.
    As detailed in Table 7, below, the standard's estimated costs, 
benefits, and compliance requirements are consistent with estimates of 
other OSHA safety standards, such as the Hazardous Waste Operations and 
Emergency Response (HAZWOPER) standard.

                                                     Table 7                                                    
----------------------------------------------------------------------------------------------------------------
                                                 Number of    Number of                                         
                               Final rule date     deaths      Injuries    Annual cost first   Annual cost next 
     Standard (CFR cite)          (FR cite)      prevented    prevented     five yrs (mill)     five yrs (mill) 
                                                  annually     annually                                         
----------------------------------------------------------------------------------------------------------------
Grain handling (1910.272)....  12-31-87 (52 FR           18          394  5.9 to 33.4.......  5.9 to 33.4.      
                                49622).                                                                         

[[Page 26350]]

                                                                                                                
HAZWOPER (1910.120)..........  3-6-89 (54 FR             32       18,700  153...............  153.              
                                9311).                                                                          
Excavations (Subpt P)........  10-31-89 (54 FR           74          800  306...............  306.              
                                45,954).                                                                        
Process Safety Mgmt            2-24-92 57 FR            330        1,917  880.1.............  470.8.            
 (1910.119).                    6356.                                                                           
Permit-Required Confined       1-14-93 58 FR             54        5,041  202.4.............  202.4.            
 Spaces (1910.146).             4462.                                                                           
----------------------------------------------------------------------------------------------------------------

    OSHA assessed employee risk by evaluating exposure to PPE- related 
hazards throughout the shipyard industry. The Summary of the Final 
Economic Analysis and Regulatory Flexibility Analysis, Section IV, 
above, presents OSHA's estimate of the costs and benefits of the 
revised PPE standard in terms of the Standard Industrial Classification 
(SIC) code for the industry regulated.
    The record indicates clearly that employees in shipyard employment 
face significant risks related to PPE-related hazards, and that 
compliance with the revised PPE standard is reasonably necessary to 
protect affected employees from those risks.
    OSHA has considered and responded to all substantive comments 
regarding the proposed Shipyard PPE standard on their merits in the 
Section III, Summary and Explanation of the Standard, earlier in this 
preamble. In particular, OSHA evaluated all suggested changes to the 
proposed rule in terms of their impact on worker safety, their 
feasibility, their cost effectiveness, and their consonance with the 
OSH Act.

VII. Federalism

    This regulation has been reviewed in accordance with Executive 
Order 12612 (52 FR 41685, October 30, 1987) regarding Federalism. This 
Order requires that Agencies, to the extent possible, refrain from 
limiting state policy options, consult with states prior to taking any 
actions which would restrict State policy options, and take such 
actions only when there is clear constitutional authority and the 
presence of a problem of national scope. The Order provides for 
preemption of state law only if there is clear Congressional intent for 
the Agency to do so. Any such preemption is to be limited to the extent 
possible.
    Section 18 of the Occupational Safety and Health Act (OSH Act) 
expresses Congress' clear intent to preempt state laws relating to 
issues on which federal OSHA has promulgated occupational safety and 
health standards. Under the OSH Act, a state can avoid preemption only 
if it submits, and obtains Federal approval of a plan for the 
development of such standards and their enforcement. Occupational 
safety and health standards developed by such states must, among other 
things, be at least as effective in providing safe and healthful 
employment and places of employment as the federal standards. Where 
such standards are applicable to products distributed or used in 
interstate commerce, they may not burden commerce unduly and must be 
justified by compelling local conditions (see section 18(c)(2) of the 
OSH Act).
    The Federal standard on personal protective equipment addresses 
hazards which are not unique to any one state or region of the country. 
Nonetheless, states with occupational safety and health plans approved 
under section 18, of the OSH Act, will be able to develop their own 
state standards to deal with any special problems which might be 
encountered in a particular state. Moreover, this standard is written 
in general, performance-oriented terms. There is considerable 
flexibility for methods of compliance which are appropriate to the 
working conditions covered by the standard.
    In brief, this regulation addresses a clear national problem 
related to occupational safety and health in shipyard employment. Those 
states which have elected to participate under section 18, of the OSH 
Act are not preempted by this standard, and will be able to deal with 
any special conditions within the framework of the Federal Act, while 
ensuring that the state standards are at least as effective as that 
standard.

VIII. State Plan Standards

    The 25 States and territories having OSHA-approved occupational 
safety and health plans which cover the issues of maritime safety and 
health must revise their existing standards within six months of the 
publication date of a final standard, or show OSHA why there is no need 
for action because an existing state standard covering this area is 
already ``at least as effective'' as the revised Federal standard. 
Currently five states (California, Minnesota, Oregon, Vermont, and 
Washington) have their own state plans which cover the private sector 
on-shore maritime activities.
    Federal OSHA enforces maritime standards off shore in all states 
and provides on-shore coverage of maritime activities in Federal OSHA 
States and in the following State plan States and territories: Alaska, 
Arizona, Connecticut, (plan covers only State and local government 
employees), Hawaii, Indiana, Iowa, Kentucky, Maryland, Michigan, 
Nevada, New Mexico, New York, (plan covers only State and local 
government employees), North Carolina, Puerto Rico, South Carolina, 
Tennessee, Utah, Virginia, Virgin Islands, and Wyoming are All States 
with State plans also must extend coverage to state and local 
government employees engaged in maritime activities.

List of Subjects in 29 CFR Part 1915

    Eye protection, Face protection, Fall protection, Foot protection, 
Hazard assessment, Head protection, Hard hats, Incorporation by 
reference, Personal flotation devices, Marine safety, Occupational 
safety and health, Personal Fall Arrest Systems, Positioning Device 
Systems, Protective equipment, Respirators, Respiratory protection, 
Safety, Ship repair, Shipyards, Snaphooks, and Vessels.

IX. Authority

    This document has been prepared under the direction of Joseph A. 
Dear, Assistant Secretary of Labor for Occupational Safety and Health, 
U.S. Department of Labor, 200 Constitution Avenue NW., Washington, D.C. 
20210.
    Accordingly, pursuant to sections 4, 6, and 8 of the Occupational 
Safety and Health Act of 1970 (29 U.S.C. 653, 655, 657); section 41, of 
the Longshore and Harbor Workers Compensation Act as amended (33 U.S.C. 
941); Section 4 of the Administrative Procedure Act (5 U.S.C. 553); 
Secretary of Labor's Order No. 1-90 (55 FR 9033); and 29 CFR part 1911, 
29 CFR part 1915 is amended as set forth below.

[[Page 26351]]

    Signed at Washington, DC, this 15th day of April 1996.
Joseph A. Dear,
Assistant Secretary of Labor.

PART 1915--[AMENDED]

    1. The Authority citation for part 1915 continues to read as 
follows:

    Authority: Secs. 4, 6, and 8, Occupational Safety and Health Act 
of 1970 (29 U.S.C. 653, 655, 657); section 41, Longshore and Harbor 
Workers' Compensation Act (33 U.S.C. 941), Secretary of Labor's 
Order No. 8-76 (41 FR 25059), No. 9-83 (48 FR 35736), No. 1-90 (55 
FR 9033), and 29 CFR part 1911.

    2. Section 1915.32 is amended by revising paragraph (a)(3) to read 
as follows:

Sec. 1915.32  Toxic cleaning solvents.

    (a) * * *
    (3) Employees shall be protected against toxic vapors by suitable 
respiratory protective equipment in accordance with the requirements of 
subpart I of this Part and, where necessary, against exposure of skin 
and eye contact with toxic solvents and their vapors by suitable 
clothing and equipment.
* * * * *
    3. Section 1915.33 is amended by revising paragraph (a) to read as 
follows:

Sec. 1915.33  Chemical paint and preservative removers.

    (a) Employees shall be protected against skin contact during the 
handling and application of chemical paint and preservative removers 
and shall be protected against eye injury by goggles or face shields in 
accordance with the requirements of subpart I of this part.
* * * * *
    4. Section 1915.34 is amended by revising paragraphs (a)(1), 
(a)(4), (b)(1), (c)(3)(i), (c)(3)(ii), and (c)(3)(iii) to read as 
follows:

Sec. 1915.34  Mechanical paint removers.

    (a) * * *
    (1) Employees engaged in the removal of paints, preservatives, 
rusts, or other coatings by means of power tools shall be protected 
against eye injury by using goggles or face shields in accordance with 
the requirements of subpart I of this part.
* * * * *
    (4) In a confined space, mechanical exhaust ventilation sufficient 
to keep the dust concentration to a minimum shall be used, or employees 
shall be protected by respiratory protective equipment in accordance 
with the requirements of subpart I of this part.
    (b) * * *
    (1) Hardened preservative coatings shall not be removed by 
FR Doc. 96-12573 Personal Protective Equipment for Shipyard Employment (PPE)
flame in 
enclosed spaces unless the employees exposed to fumes are protected by 
air line respirators in accordance with the requirements of subpart I. 
Employees performing such an operation in the open air, and those 
exposed to the resulting fumes shall be protected by a fume filter type 
respirator in accordance with the requirements of subpart I of this 
part.
* * * * *
    (c) * * *
    (3) * * *
    (i) Abrasive blasters working in enclosed spaces shall be protected 
by hoods and air line respirators, or by air helmets of a positive 
pressure type in accordance with the requirements of subpart I of this 
part.
    (ii) Abrasive blasters working in the open shall be protected as 
indicated in paragraph (c)(3)(i) of this section except that when 
synthetic abrasive containing less than one percent free silica are 
used, filter type respirators approved jointly by the National 
Institute for Occupational Safety and Health and the Mine Safety and 
Health Administration for exposure to lead dusts, used in conjunction 
with the proper eye, face and head protection, may be used in 
accordance with subpart I of this part.
    (iii) Employees, other than blasters, including machine tenders and 
abrasive recovery men, working in areas where unsafe concentrations of 
abrasive materials and dusts are present shall be protected by eye and 
respiratory protective equipment in accordance with the requirements of 
subpart I of this part.
* * * * *
    5. Section 1915.35 is amended by revising paragraphs (a)(1)(i), 
(a)(1)(ii), (a)(1)(iii), (a)(2), (b)(13), and (b)(14) to read as 
follows:

Sec. 1915.35  Painting.

    (a) * * *
    (1) * * *
    (i) In confined spaces, employees continuously exposed to such 
spraying shall be protected by air line respirators in accordance with 
the requirements of subpart I of this part.
    (ii) In tanks or compartments, employees continuously exposed to 
such spraying shall be protected by air line respirators in accordance 
with the requirements of subpart I. Where mechanical ventilation is 
provided, employees shall be protected by respirators in accordance 
with the requirements of subpart I of this part.
    (iii) In large and well ventilated areas, employees exposed to such 
spraying shall be protected by respirators in accordance with the 
requirements of subpart I of this part.
    (2) Where brush application of paints with toxic solvents is done 
in confined spaces or in other areas where lack of ventilation creates 
a hazard, employees shall be protected by filter respirators in 
accordance with the requirements of subpart I of this part.
* * * * *
    (b) * * *
    (13) All employees continuously in a compartment in which such 
painting is being performed shall be protected by air line respirators 
in accordance with the requirements of Subpart I of this part and by 
suitable protective clothing. Employees entering such compartments for 
a limited time shall be protected by filter cartridge type respirators 
in accordance with the requirements of subpart I of this part.
    (14) All employees doing exterior paint spraying with such paints 
shall be protected by suitable filter cartridge type respirators in 
accordance with the requirements of subpart I of this part and by 
suitable protective clothing.
    6. Section 1915 would be amended by removing Table I-1 from 
Sec. 1915.118.
    7. Section 1915.134 is amended by revising paragraph (j) to read as 
follows:

Sec. 1915.134   Abrasive wheels.

* * * * *
    (j) All employees using abrasive wheels shall be protected by eye 
protection equipment in accordance with the requirements of Subpart I 
of this part except when adequate eye protection is afforded by eye 
shields which are permanently attached to the bench or floor stand.
    8. Section 1915.135 is amended by revising paragraph (b)(9) to read 
as follows:

Sec. 1915.135   Powder actuated fastening tools.

* * * * *
    (b) * * *
    (9) Employees using powder actuated fastening tools shall be 
protected by personal protective equipment in accordance with the 
requirements of subpart I of this part.
* * * * *
    9. Subpart I of Part 1915 is revised to read as follows:

Subpart I--Personal Protective Equipment (PPE)

Sec.
1915.151  Scope, application and definitions.
1915.152  General requirements.
1915.153  Eye and face protection.
1915.154  Respiratory protection.
1915.155  Head protection.
1915.156  Foot protection.
1915.157  Hand and body protection.
1915.158  Lifesaving equipment.

[[Page 26352]]

1915.159  Personal fall arrest systems (PFAS).
1915.160  Positioning device systems.

Appendix A to subpart I--Non-mandatory Guidelines for Hazard 
Assessment, Personal Protective Equipment (PPE) Selection, and PPE 
Training program.
Appendix B to subpart I-- General Testing Conditions and Additional 
Guidelines for Personal Fall Protection Systems.

Subpart I--Personal Protective Equipment (PPE)

Sec. 1915.151   Scope, application and definitions.

    (a) Scope and application. This subpart applies to all work in 
shipyard employment regardless of geographic location.
    (b) Definitions applicable to this subpart.
    Anchorage means a secure point of attachment for lifelines, 
lanyards, or deceleration devices.
    Body belt means a strap with means for both securing it about the 
waist and attaching it to a lanyard, lifeline, or deceleration device.
    Body harness means straps which may be secured about the employee 
in a manner that will distribute the fall arrest forces over at least 
the thighs, shoulders, chest and pelvis with means for attaching it to 
other components of a personal fall arrest system.
    Connector means a device which is used to couple (connect) parts of 
a personal fall arrest system or parts of a positioning device system 
together. It may be an independent component of the system, such as a 
carabiner, or it may be an integral component of part of the system 
(such as a buckle or D-ring sewn into a body belt or body harness or a 
snaphook spliced or sewn to a lanyard or self-retracting lanyard).
    Deceleration device means any mechanism, such as a rope grab, 
ripstitch lanyard, specially woven lanyard, tearing or deforming 
lanyard, or automatic self-retracting lifeline/lanyard, which serves to 
dissipate a substantial amount of energy during a fall arrest, or 
otherwise limit the energy imposed on an employee during fall arrest.
    Deceleration distance means the additional vertical distance a 
falling employee travels, excluding lifeline elongation and free fall 
distance, before stopping, from the point at which the deceleration 
device begins to operate. It is measured as the distance between the 
location of an employee's body belt or body harness attachment point at 
the moment of activation (at the onset of fall arrest forces) of the 
deceleration device during a fall, and the location of that attachment 
point after the employee comes to a full stop.
    Equivalent means alternative designs, materials, or methods to 
protect against a hazard which the employer can demonstrate will 
provide an equal or greater degree of safety for employees than the 
method or item specified in the standard.
    Free fall means the act of falling before a personal fall arrest 
system begins to apply force to arrest the fall.
    Free fall distance means the vertical displacement of the fall 
arrest attachment point on the employee's body belt or body harness 
between onset of the fall and just before the system begins to apply 
force to arrest the fall. This distance excludes deceleration distance, 
and lifeline/lanyard elongation, but includes any deceleration device 
slide distance or self-retracting lifeline/lanyard extension before the 
device operates and fall arrest forces occur.
    Lanyard means a flexible line of rope, wire rope, or strap which 
generally has a connector at each end for connecting the body belt or 
body harness to a deceleration device, lifeline, or anchorage.
    Lifeline means a component consisting of a flexible line for 
connection to an anchorage at one end to hang vertically (vertical 
lifeline), or for connection to anchorages at both ends to stretch 
horizontally (horizontal lifeline), and which serves as a means for 
connecting other components of a personal fall arrest system to the 
anchorage.
    Lower levels means those areas or surfaces to which an employee can 
fall. Such areas or surfaces include but are not limited to ground 
levels, floors, ramps, tanks, materials, water, excavations, pits, 
vessels, structures, or portions thereof.
    Personal fall arrest system means a system used to arrest an 
employee in a fall from a working level. It consists of an anchorage, 
connectors, body belt or body harness and may include a lanyard, a 
deceleration device, a lifeline, or a suitable combination of these. As 
of January 1, 1998, the use of a body belt for fall arrest is 
prohibited.
    Positioning device system means a body belt or body harness system 
rigged to allow an employee to be supported at an elevated vertical 
surface, such as a wall or window, and to be able to work with both 
hands free while leaning.
    Qualified person means a person who by possession of a recognized 
degree or certificate of professional standing, or who, by extensive 
knowledge, training, and experience, has successfully demonstrated the 
ability to solve or resolve problems related to the subject matter and 
work.
    Restraint (tether) line means a line from an anchorage, or between 
anchorages, to which the employee is secured in such a way as to 
prevent the employee from walking or falling off an elevated work 
surface. Note: A restraint line is not necessarily designed to 
withstand forces resulting from a fall.
    Rope grab means a deceleration device which travels on a lifeline 
and automatically, by friction, engages the lifeline and locks so as to 
arrest the fall of an employee. A rope grab usually employs the 
principle of inertial locking, cam/level locking or both.

Sec. 1915.152   General requirements.

    (a) Provision and use of equipment. The employer shall provide and 
shall ensure that each affected employee uses the appropriate personal 
protective equipment (PPE) for the eyes, face, head, extremities, 
torso, and respiratory system, including protective clothing, 
protective shields, protective barriers, personal fall protection 
equipment, and life saving equipment, meeting the applicable provisions 
of this subpart, wherever employees are exposed to work activity 
hazards that require the use of PPE.
    (b) Hazard assessment and equipment selection. The employer shall 
assess its work activity to determine whether there are hazards 
present, or likely to be present, which necessitate the employee's use 
of PPE.

    Note 1 to paragraph (b): A hazard assessment conducted according 
to the trade or occupation of affected employees will be considered 
to comply with paragraph (b) of this section, if the assessment 
addresses any PPE-related hazards to which employees are exposed in 
the course of their work activities. If such hazards are present, or 
likely to be present, the employer shall:
    (1) Select the type of PPE that will protect the affected 
employee from the hazards identified in the occupational hazard 
assessment;
    (2) Communicate selection decisions to affected employees;
    (3) Select PPE that properly fits each affected employee; and
    (4) Verify that the required occupational hazard assessment has 
been performed through a document that contains the following 
information: occupation, the date(s) of the hazard assessment, and 
the name of the person performing the hazard assessment.

    Note 2 to paragraph (b): Non-mandatory Appendix A to this 
subpart contains examples of procedures that will comply with the 
requirement for an occupational hazard assessment.

    (c) Defective and damaged equipment. Defective or damaged PPE shall 
not be used.

[[Page 26353]]

    (d) Reissued equipment. The employer shall ensure that all 
unsanitary PPE, including that which has been used by employees, be 
cleaned and disinfected before it is reissued.
    (e) Training. (1) The employer shall provide training to each 
employee who is required, by this section, to use PPE (exception: 
training in the use of personal fall arrest systems and positioning 
device systems training is covered in Sections 1915.159 and 1915.160). 
Each employee shall be trained to understand at least the following:
    (i) When PPE is necessary;
    (ii) What PPE is necessary;
    (iii) How to properly don, doff, adjust, and wear PPE;
    (iv) The limitations of the PPE; and,
    (v) The proper care, maintenance, useful life and disposal of the 
PPE.
    (2) The employer shall ensure that each effected employee 
demonstrates the ability to use PPE properly before being allowed to 
perform work requiring the use of PPE.
    (3) The employer shall retrain any employee who does not understand 
or display the skills required by paragraph (e)(2) of this section. 
Circumstances where retraining is required include, but are not limited 
to, situations where:
    (i) Changes in occupation or work render previous training 
obsolete; or
    (ii) Changes in the types of PPE to be used render previous 
training obsolete; or
    (iii) Inadequacies in an affected employee's knowledge or use of 
assigned PPE indicate that the employee has not retained the requisite 
understanding or skill.
    (4) The employer shall verify that each affected employee has 
received the required training through a document that contains the 
following information: name of each employee trained, the date(s) of 
training, and type of training the employee received.

Sec. 1915.153   Eye and face protection.

    (a) General requirements. (1) The employer shall ensure that each 
affected employee uses appropriate eye or face protection where there 
are exposures to eye or face hazards caused by flying particles, molten 
metal, liquid chemicals, acid or caustic liquids, chemical gases or 
vapors, or potentially injurious light radiation.
    (2) The employer shall ensure that each affected employee uses eye 
or face protection that provides side protection when there is a hazard 
from flying objects. Detachable side protectors (e.g., a clip-on or 
slide-on side shield) meeting the pertinent requirements of this 
section are acceptable.
    (3) The employer shall ensure that each affected employee who wears 
prescription lenses while engaged in operations that involve eye 
hazards wears eye protection that incorporates the prescription in its 
design, unless the employee is protected by eye protection that can be 
worn over prescription lenses without disturbing the proper position of 
either the PPE or the prescription lenses.
    (4) The employer shall ensure that each affected employee uses 
equipment with filter lenses that have a shade number that provides 
appropriate protection from injurious light radiation. Table I-1 is a 
listing of appropriate shade numbers for various operations. If filter 
lenses are used in goggles worn under a helmet which has a lens, the 
shade number of the lens in the helmet may be reduced so that the shade 
numbers of the two lenses will equal the value as shown in Table I-1, 
Sec. 1915.153.

                         Table I-1.--Filter Lenses for Protection Against Radiant Energy                        
----------------------------------------------------------------------------------------------------------------
                                                                                                       Minimum  
                Operations                  Electrode size \1/32\ in.           Arc current           protective
                                                                                                        shade   
----------------------------------------------------------------------------------------------------------------
Shielded metal arc welding...............  Less than 3................  Less than..................            7
                                           3-5........................  60.........................            8
                                           5-8........................  60-160.....................           10
                                           More than 8................  160-250....................           11
                                           ...........................  250-550....................  ...........
Gas metal arc welding and flux cored arc   ...........................  Less than..................            7
 welding.                                                                                                       
                                           ...........................  60.........................           10
                                           ...........................  60-160.....................           10
                                           ...........................  160-250....................           10
                                           ...........................  250-500....................  ...........
Gas Tungsten arc welding.................  ...........................  Less than..................            8
                                           ...........................  50.........................            8
                                           ...........................  50-150.....................           10
                                           ...........................  150-500....................  ...........
Air carbon...............................  (Light)....................  Less than..................           10
Arc cutting..............................  (Heavy)....................  500........................           11
                                                                        500-1000...................  ...........
Plasma arc welding.......................  ...........................  Less than..................            6
                                           ...........................  20.........................            8
                                           ...........................  20-........................           10
                                           ...........................  100........................           11
                                           ...........................  100-.......................  ...........
                                           ...........................  400........................  ...........
                                           ...........................  400-.......................  ...........
                                           ...........................  800........................  ...........
Plasma arc cutting.......................  (light)**..................  Less than 300..............            8
                                           (medium)**.................  300-400....................            9
                                           (heavy)**..................  400-800....................           10
Torch brazing............................  ...........................  ...........................            3
Torch soldering..........................  ...........................  ...........................            2
Carbon Arc welding.......................  ...........................  ...........................          14 
----------------------------------------------------------------------------------------------------------------
** These values apply where the actual arc is clearly seen. Lighter filters may be used when the arc is hidden  
  by the workpiece.                                                                                             

[[Page 26354]]

                               Filter Lenses for Protection Against Radiant Energy                              
----------------------------------------------------------------------------------------------------------------
                                                                                                       Minimum* 
                Operations                   Plate thickness-- inches       Plate thickness-- mm      protective
                                                                                                        shade   
----------------------------------------------------------------------------------------------------------------
Gas welding:                                                                                                    
    Light................................  Under \1/8\................  Under 3.2..................            4
    Medium...............................  \1/8\ to \1/2\.............  3.2 to 12.7................            5
    Heavy................................  Over \1/2\.................  Over 12.7..................            6
Oxygen cutting                                                                                                  
    Light................................  Under 1....................  Under 25...................            3
    Medium...............................  1 to 6.....................  25 to 150..................            4
    Heavy................................  Over 6.....................  Over 150...................           5 
----------------------------------------------------------------------------------------------------------------
* As a rule of thumb, start with a shade that is too dark to see the weld zone. Then go to a lighter shade which
  gives sufficient view of the weld zone without going below the minimum. In oxyfuel gas welding or cutting     
  where the torch produces a high yellow light, it is desirable to use a filter lens that absorbs the yellow or 
  sodium line in the visible light of the (spectrum) operation.                                                 

    (b) Criteria for Protective Eye and Face Devices
    (1) Protective eye and face devices purchased after (insert 
effective date of final rule) shall comply with the American National 
Standards Institute, ANSI Z87.1-1989, ``Practice for Occupational and 
Educational Eye and Face Protection,'' which is incorporated by 
reference as specified in Sec. 1915.5, or shall be demonstrated by the 
employer to be equally effective.
    (2) Eye and face protective devices purchased before (insert 
effective date of final rule) shall comply with ``American National 
Standard Practice for Occupational and Educational Eye and Face 
Protection, Z87.1 -1979,'' which is incorporated by reference as 
specified in Sec. 1915.5, or shall be demonstrated by the employer to 
be equally effective.

Sec. 1915.154  Respiratory protection.

    Respiratory protection for shipyard employment is covered by 29 CFR 
1910.134.

Sec. 1915.155  Head protection.

    (a) Use. (1) The employer shall ensure that each affected employee 
wears a protective helmet when working in areas where there is a 
potential for injury to the head from falling objects.
    (2) The employer shall ensure that each affected employee wears a 
protective helmet designed to reduce electrical shock hazards where 
there is potential for electric shock or burns due to contact with 
exposed electrical conductors which could contact the head.
    (b) Criteria for protective helmets. (1) Protective helmets 
purchased after August 22, 1996 shall comply with ANSI Z89.l-1986, 
``Personnel Protection--Protective Headwear for Industrial Workers-
Requirements,'' which is incorporated by reference, as specified in 
Sec. 1915.5, or shall be demonstrated by the employer to be equally 
effective.
    (2) Protective helmets purchased before August 22, 1996 shall 
comply with the ``American National Standard Safety Requirements for 
Industrial Head Protection, Z89.1-1969,'' which is incorporated by 
reference as specified in 1915.5, or shall be demonstrated by the 
employer to be equally effective.

Sec. 1915.156  Foot protection.

    (a) Use. The employer shall ensure that each affected employee 
wears protective footwear when working in areas where there is a danger 
of foot injuries due to falling or rolling objects or objects piercing 
the sole.
    (b) Criteria for protective footwear. (1) Protective footwear 
purchased after August 22, 1996 shall comply with ANSI Z41-1991, 
``American National Standard for Personal Protection-Protective 
Footwear,'' which is incorporated by reference, as specified in 
Sec. 1915.5, or shall be demonstrated by the employer to be equally as 
effective.
    (2) Protective footwear purchased before August 22, 1996 shall 
comply with the ``American National Standard for Personal Protection- 
Protective Footwear Z41-1983,'' which is incorporated by reference, as 
specified in Sec. 1915.5, or shall be demonstrated by the employer to 
be equally effective.

Sec. 1915.157  Hand and body protection.

    (a) Use. The employer shall ensure that each affected employee uses 
appropriate hand protection and other protective clothing where there 
is exposure to hazards such as skin absorption of harmful substances, 
severe cuts or lacerations, severe abrasions, punctures, chemical 
burns, thermal burns, harmful temperature extremes, and sharp objects.
    (b) Hot work operations. The employer shall ensure that no employee 
wears clothing impregnated or covered in full or in part with flammable 
or combustible materials (such as grease or oil) while engaged in hot 
work operations or working near an ignition source.
    (c) Electrical Protective Devices. The employer shall ensure that 
each affected employee wears protective electrical insulating gloves 
and sleeves or other electrical protective equipment, if that employee 
is exposed to electrical shock hazards while working on electrical 
equipment.

Sec. 1915.158  Lifesaving equipment.

    (a) Personal flotation devices. (1) Personal flotation devices 
(PFD) (life preservers, life jackets and work vests) worn by each 
affected employee shall be any United States Coast Guard (USCG) 
approved and marked Type I PFD, Type II PFD, or Type III PFD; or PFDs 
shall be a USCG approved Type V PFD which is marked for use as a work 
vest, for commercial use, or for use on vessels. USCG approval is 
pursuant to 46 CFR part 160, subpart Q, Coast Guard Lifesaving 
Equipment Specifications.
    (2) Prior to each use, personal floatation devices shall be 
inspected for dry rot, chemical damage, or other defects which may 
affect their strength and buoyancy. Defective personal floatation 
devices shall not be used.
    (b) Ring life buoys and ladders. (1) When work is being performed 
on a floating vessel 200 feet (61 m) or more in length, at least three 
30-inch (0.76 m) U.S. Coast Guard approved ring life buoys with lines 
attached shall be located in readily visible and accessible places. 
Ring life buoys shall be located one forward, one aft, and one at the 
access to the gangway.
    (2) On floating vessels under 200 feet (61 m) in length, at least 
one 30-inch (0.76 m) U.S. Coast Guard approved ring life buoy with line 
attached shall be located at the gangway.
    (3) At least one 30-inch (0.76 m) U. S. Coast Guard approved ring 
life buoy with a line attached shall be located on each staging 
alongside of a floating

[[Page 26355]]

vessel on which work is being performed.
    (4) At least 90 feet (27 m) of line shall be attached to each ring 
life buoy.
    (5) There shall be at least one portable or permanent ladder in the 
vicinity of each floating vessel on which work is being performed. The 
ladder shall be of sufficient length to assist employees to reach 
safety in the event they fall into the water.

Sec. 1915.159  Personal fall arrest systems (PFAS).

    The criteria of this section apply to PFAS and their use. Effective 
January 1, 1998, body belts and non-locking snaphooks are not 
acceptable as part of a personal fall arrest system.
    (a) Criteria for connectors and anchorages. (1) Connectors shall be 
made of drop forged, pressed, or formed steel or shall be made of 
materials with equivalent strength.
    (2) Connectors shall have a corrosion-resistant finish, and all 
surfaces and edges shall be smooth to prevent damage to the interfacing 
parts of the system.
    (3) D-rings and snaphooks shall be capable of sustaining a minimum 
tensile load of 5,000 pounds (22.2 Kn).
    (4) D-rings and snaphooks shall be proof-tested to a minimum 
tensile load of 3,600 pounds (16 Kn) without cracking, breaking, or 
being permanently deformed.
    (5) Snaphooks shall be sized to be compatible with the member to 
which they are connected to prevent unintentional disengagement of the 
snaphook caused by depression of the snaphook keeper by the connected 
member, or shall be of a locking type that is designed and used to 
prevent disengagement of the snap-hook by contact of the snaphook 
keeper by the connected member.
    (6) Snaphooks, unless of a locking type designed and used to 
prevent disengagement from the following connections, shall not be 
engaged:
    (i) directly to webbing, rope or wire rope;
    (ii) to each other;
    (iii) to a D-ring to which another snaphook or other connector is 
attached;
    (iv) to a horizontal lifeline; or
    (v) to any object that is incompatibly shaped or dimensioned in 
relation to the snaphook such that unintentional disengagement could 
occur by the connected object being able to depress the snaphook keeper 
and release itself.
    (7) On suspended scaffolds or similar work platforms with 
horizontal lifelines that may become vertical lifelines, the devices 
used for connection to the horizontal lifeline shall be capable of 
locking in any direction on the lifeline.
    (8) Anchorages used for attachment of personal fall arrest 
equipment shall be independent of any anchorage being used to support 
or suspend platforms.
    (9) Anchorages shall be capable of supporting at least 5,000 pounds 
(22.2 Kn) per employee attached, or shall be designed, installed, and 
used as follows:
    (i) as part of a complete personal fall arrest system which 
maintains a safety factor of at least two; and
    (ii) under the direction and supervision of a qualified person.
    (b) Criteria for lifelines, lanyards, and personal fall arrest 
systems.
    (1) When vertical lifelines are used, each employee shall be 
provided with a separate lifeline.
    (2) Vertical lifelines and lanyards shall have a minimum tensile 
strength of 5,000 pounds (22.2 Kn).
    (3) Self-retracting lifelines and lanyards that automatically limit 
free fall distances to 2 feet (0.61 m) or less shall be capable of 
sustaining a minimum tensile load of 3000 pounds (13.3 Kn) applied to a 
self-retracting lifeline or lanyard with the lifeline or lanyard in the 
fully extended position.
    (4) Self-retracting lifelines and lanyards which do not limit free 
fall distance to 2 feet (0.61 m) or less, ripstitch lanyards and 
tearing and deforming lanyards shall be capable of sustaining a minimum 
static tensile load of 5,000 pounds (22.2 Kn) applied to the device 
when they are in the fully extended position.
    (5) Horizontal lifelines shall be designed, installed, and used 
under the supervision of a qualified person, and shall only be used as 
part of a complete personal fall arrest system that maintains a safety 
factor of at least two.
    (6) Effective November 20, 1996, personal fall arrest systems 
shall:
    (i) limit the maximum arresting force on a falling employee to 900 
pounds (4 Kn) when used with a body belt;
    (ii) limit the maximum arresting force on a falling employee to 
1,800 pounds (8 Kn) when used with a body harness;
    (iii) bring a falling employee to a complete stop and limit the 
maximum deceleration distance an employee travels to 3.5 feet (1.07 m), 
and
    (iv) have sufficient strength to withstand twice the potential 
impact energy of an employee free falling a distance of 6 feet (1.8 m), 
or the free fall distance permitted by the system, whichever is less;

    Note to paragraph (b)(6) of this section: A personal fall arrest 
system which meets the criteria and protocols contained in Appendix 
B, is considered to comply with paragraph (b)(6). If the combined 
tool and body weight is 310 pounds (140 kg) or more, systems that 
meet the criteria and protocols contained in Appendix B will be 
deemed to comply with the provisions of paragraphs (b)(6) only if 
they are modified appropriately to provide protection for the extra 
weight of the employee and tools.

    (7) Personal fall arrest systems shall be rigged such that an 
employee can neither free fall more than 6 feet (1.8 m) nor contact any 
lower level.
    (c) Criteria for selection, use and care of systems and system 
components. (1) Lanyards shall be attached to employees using personal 
fall arrest systems, as follows:
    (i) The attachment point of a body harness shall be located in the 
center of the wearer's back near the shoulder level, or above the 
wearer's head. If the free fall distance is limited to less than 20 
inches, the attachment point may be located in the chest position; and
    (ii) The attachment point of a body belt shall be located in the 
center of the wearer's back.
    (2) Ropes and straps (webbing) used in lanyards, lifelines and 
strength components of body belts and body harnesses shall be made from 
synthetic fibers or wire rope.
    (3) Ropes, belts, harnesses, and lanyards shall be compatible with 
their hardware.
    (4) Lifelines and lanyards shall be protected against cuts, 
abrasions, burns from hot work operations and deterioration by acids, 
solvents, and other chemicals.
    (5) Personal fall arrest systems shall be inspected prior to each 
use for mildew, wear, damage, and other deterioration. Defective 
components shall be removed from service.
    (6) Personal fall arrest systems and components subjected to impact 
loading shall be immediately removed from service and shall not be used 
again for employee protection until inspected and determined by a 
qualified person to be undamaged and suitable for reuse.
    (7) The employer shall provide for prompt rescue of employees in 
the event of a fall or shall ensure that employees are able to rescue 
themselves.
    (8) Body belts shall be at least one and five eighths inches (4.1 
cm) wide.
    (9) Personal fall arrest systems and components shall be used only 
for employee fall protection and not to hoist materials.
    (d) Training. Before using personal fall arrest equipment, each 
affected employee shall be trained to understand the application limits 
of the equipment and proper hook-up, anchoring, and tie-off techniques. 
Affected employees shall also be trained so that they can demonstrate 
the proper use, inspection, and storage of their equipment.

[[Page 26356]]

Sec. 1915.160  Positioning device systems.

    Positioning device systems and their use shall conform to the 
following provisions:
    (a) Criteria for connectors and anchorages. (1) Connectors shall 
have a corrosion-resistant finish, and all surfaces and edges shall be 
smooth to prevent damage to interfacing parts of this system.
    (2) Connecting assemblies shall have a minimum tensile strength of 
5,000 pounds (22.2 Kn).
    (3) Positioning device systems shall be secured to an anchorage 
capable of supporting at least twice the potential impact load of an 
employee's fall.
    (4) Snaphooks, unless each is of a locking type designed and used 
to prevent disengagement, shall not be connected to each other. As of 
January 1, 1998, only locking type snaphooks shall be used in 
positioning device systems.
    (b) Criteria for positioning device systems. (1) Restraint (tether) 
lines shall have a minimum breaking strength of 3,000 pounds (13.3 Kn).
    (2) The following system performance criteria for positioning 
device systems are effective November 20, 1996:
    (i) A window cleaner's positioning system shall be capable of 
withstanding without failure a drop test consisting of a 6 foot (1.83 
m) drop of a 250 pound (113 kg) weight. The system shall limit the 
initial arresting force to not more than 2,000 pounds (8.89 Kn), with a 
duration not to exceed 2 milliseconds. The system shall limit any 
subsequent arresting forces imposed on the falling employee to not more 
than 1,000 pounds (4.45 Kn);
    (ii) All other positioning device systems shall be capable of 
withstanding without failure a drop test consisting of a 4- foot (1.2 
m) drop of a 250-pound (113 kg) weight.

    Note to paragraph (b)(2) of this section: Positioning device 
systems which comply with the provisions of Section 2 of Non-
mandatory Appendix B to this subpart shall be deemed to meet the 
requirements of this paragraph (b)(2).

    (c) Criteria for the use and care of positioning device systems. 
(1) Positioning device systems shall be inspected before each use for 
mildew, wear, damage, and other deterioration. Defective components 
shall be removed from service.
    (2) A positioning device system or component subjected to impact 
loading shall be immediately removed from service and shall not be used 
again for employee protection, unless inspected and determined by a 
qualified person to be undamaged and suitable for reuse.
    (d) Training. Before using a positioning device system, employees 
shall be trained in the application limits, proper hook-up, anchoring 
and tie-off techniques, methods of use, inspection, and storage of 
positioning device systems.

Appendix A to Subpart I--Non-mandatory Guidelines for Hazard 
Assessment, Personal Protective Equipment (PPE) Selection, and PPE 
Training Program

    This Appendix is intended to provide compliance assistance for 
hazard assessment, selection of personal protective equipment (PPE) 
and PPE training. It neither adds to or detracts from the employer's 
responsibility to comply with the provisions of this subpart.
    1. Controlling hazards. Employers and employees should not rely 
exclusively on PPE for protection from hazards. PPE should be used, 
where appropriate, in conjunction with engineering controls, guards, 
and safe work practices and procedures.
    2. Assessment and selection. Employers need to consider certain 
general guidelines for assessing the hazardous situations that are 
likely to arise under foreseeable work activity conditions and to 
match employee PPE to the identified hazards. The employer should 
designate a safety officer or some other qualified person to 
exercise common sense and appropriate expertise to assess work 
activity hazards and select PPE.
    3. Assessment guidelines. In order to assess the need for PPE 
the following steps should be taken:
    a. Survey. Conduct a walk-through survey of the area in question 
to identify sources of hazards.
    Categories for Consideration:

(1) Impact
(2) Penetration
(3) Compression (roll-over)
(4) Chemical
(5) Heat
(6) Harmful dust
(7) Light (optical) radiation
(8) Drowning
(9) Falling

    b. Sources. During the walk-through survey the safety officer 
should observe:
    (1) Sources of motion; for example, machinery or processes where 
any movement of tools, machine elements or particles could exist, or 
movement of personnel that could result in collision with stationary 
objects.
    (2) Sources of high temperatures that could result in burns, eye 
injury or ignition of protective equipment.
    (3) Types of chemical exposures.
    (4) Sources of harmful dust.
    (5) Sources of light radiation, for instance, welding, brazing, 
cutting, heat treating, furnaces, and high intensity lights.
    (6) Sources of falling objects or potential for dropping 
objects.
    (7) Sources of sharp objects which might pierce or cut the 
hands.
    (8) Sources of rolling or pinching objects which could crush the 
feet.
    (9) Layout of work place and location of co-workers.
    (10) Any electrical hazards.
    (11) Review injury/accident data to help identify problem areas.
    Organize data. Following the walk-through survey, it is 
necessary to organize the data and other information obtained. That 
material provides the basis for hazard assessment that enables the 
employer to select the appropriate PPE.
    d. Analyze data. Having gathered and organized data regarding a 
particular occupation, employers need to estimate the potential for 
injuries. Each of the identified hazards (see paragraph 3.a.) should 
be reviewed and classified as to its type, the level of risk, and 
the seriousness of any potential injury. Where it is foreseeable 
that an employee could be exposed to several hazards simultaneously, 
the consequences of such exposure should be considered.
    4. Selection guidelines. After completion of the procedures in 
paragraph 3, the general procedure for selection of protective 
equipment is to:
    (a) become familiar with the potential hazards and the types of 
protective equipment that are available, and what they can do; for 
example, splash protection, and impact protection;
    (b) compare the hazards associated with the environment; for 
instance, impact velocities, masses, projectile shapes, radiation 
intensities, with the capabilities of the available protective 
equipment;
    (c) select the protective equipment which ensures a level of 
protection greater than the minimum required to protect employees 
from the hazards; and
    (d) fit the user with the protective device and give 
instructions on care and use of the PPE. It is very important that 
users be made aware of all warning labels and limitations of their 
PPE.
    5. Fitting the device. Careful consideration must be given to 
comfort and fit. The employee will be most likely to wear the 
protective device if it fits comfortably. PPE that does not fit 
properly may not provide the necessary protection, and may create 
other problems for wearers. Generally, protective devices are 
available in a variety of sizes and choices. Therefore employers 
should be careful to select the appropriate sized PPE.
    6. Devices with adjustable features. (a) Adjustments should be 
made on an individual basis so the wearer will have a comfortable 
fit that maintains the protective device in the proper position. 
Particular care should be taken in fitting devices for eye 
protection against dust and chemical splash to ensure that the seal 
is appropriate for the face.
    (b) In addition, proper fitting of hard hats is important to 
ensure that the hard hat will not fall off during work operations. 
In some cases a chin strap may be necessary to keep the hard hat on 
an employee's head. (Chin straps should break at a reasonably low 
force to prevent a strangulation hazard). Where manufacturer's 
instructions are available, they should be followed carefully.
    7. Reassessment of hazards. Compliance with the hazard 
assessment requirements of Sec. 1915.152(b) will involve the 
reassessment of work activities where changing circumstances make it 
necessary. a. The

[[Page 26357]]

employer should have a safety officer or other qualified person 
reassess the hazards of the work activity area as necessary. This 
reassessment should take into account changes in the workplace or 
work practices, such as those associated with the installation of 
new equipment, and the lessons learned from reviewing accident 
records, and a reevaluation performed to determine the suitability 
of PPE selected for use.
    8. Selection chart guidelines for eye and face protection. 
Examples of occupations for which eye protection should be routinely 
considered are carpenters, engineers, coppersmiths, instrument 
technicians, insulators, electricians, machinists, mobile equipment 
mechanics and repairers, plumbers and ship fitters, sheet metal 
workers and tinsmiths, grinding equipment operators, machine 
operators, welders, boiler workers, painters, laborers, grit 
blasters, ship fitters and burners. This is not a complete list of 
occupations that require the use of eye protection. The following 
chart provides general guidance for the proper selection of eye and 
face protection to protect against hazards associated with the 
listed hazard ``source'' operations.

                                     Eye and Face Protection Selection Chart                                    
----------------------------------------------------------------------------------------------------------------
                 Source                        Assessment of hazard                     Protection              
----------------------------------------------------------------------------------------------------------------
Impact:                                                                                                         
    Chipping, grinding machining,         Flying fragments, objects,     Spectacles with side protection,       
     masonry work, woodworking, sawing,    large chips, particles,        goggles, face shields. See notes (1), 
     drilling, chiseling, powered          sand, dirt, etc.               (3), (5), (6), (10). For severe       
     fastening, riveting, and sanding.                                    exposure, use face shield.            
Heat:                                                                                                           
    Furnace operations, pouring,          Hot sparks...................  Face shields, goggles, spectacles with 
     casting, hot dipping, and welding.                                   side protection. For severe exposure  
                                                                          use face shield. See notes (1), (2),  
                                                                          (3).                                  
                                          Splash from molten metals....  Face shields worn over goggles. See    
                                                                          notes (1), (2), (3).                  
                                          High temperature exposure....  Screen face shields, reflective face   
                                                                          shields. See notes (1), (2), (3).     
Chemicals:                                                                                                      
    Acid and chemicals handling,          Splash.......................  Goggles, eyecup and cover types. For   
     degreasing, plating.                                                 severe exposure, use face shield. See 
                                                                          notes (3), (11).                      
                                          Irritating mists.............  Special-purpose goggles.               
Dust:                                                                                                           
    Woodworking, buffing, general dusty   Nuisance dust................  Goggles, eyecup and cover types. See   
     conditions.                                                          note (8).                             
Light and/or Radiation:                                                                                         
    Welding: Electric arc...............  Optical radiation............  Welding helmets or welding shields.    
                                                                          Typical shades: 10-14. See notes (9), 
                                                                          (12).                                 
    Welding: Gas........................  Optical radiation............  Welding goggles or welding face shield.
                                                                          Typical shades: gas welding 4-8,      
                                                                          cutting 3-6, brazing 3-4. See note    
                                                                          (9).                                  
    Cutting, Torch brazing, Torch         Optical radiation............  Spectacles or welding face-shield.     
     soldering.                                                           Typical shades, 1.5-3. See notes (3), 
                                                                          (9).                                  
    Glare...............................  Poor vision..................  Spectacles with shaded or special-     
                                                                          purpose lenses, as suitable. See notes
                                                                          (9), (10).                            
----------------------------------------------------------------------------------------------------------------

Notes to Eye and Face Protection Selection Chart

    (a) Care should be taken to recognize the possibility of 
multiple and simultaneous exposure to a variety of hazards. Adequate 
protection against the highest level of each of the hazards should 
be provided. Protective devices do not provide unlimited protection.
    (b) Operations involving heat may also involve light radiation. 
As required by the standard, protection from both hazards must be 
provided.
    (c) Face shields should only be worn over primary eye protection 
(spectacles or goggles).
    (d) As required by the standard, filter lenses must meet the 
requirements for shade designations in Sec. 1915.153(a)(4). Tinted 
and shaded lenses are not filter lenses unless they are marked or 
identified as such.
    (e) As required by the standard, persons whose vision requires 
the use of prescription (Rx) lenses must wear either protective 
devices fitted with prescription (Rx) lenses or protective devices 
designed to be worn over regular prescription (Rx) eye wear.
    (f) Wearers of contact lenses must also wear appropriate eye and 
face protection devices in a hazardous environment. It should be 
recognized that dusty and/or chemical environments may represent an 
additional hazard to contact lens wearers.
    (g) Caution should be exercised in the use of metal frame 
protective devices in electrical hazard areas.
    (h) Atmospheric conditions and the restricted ventilation of the 
protector can cause lenses to fog. Frequent cleansing may be 
necessary.
    (i) Welding helmets or face shields should be used only over 
primary eye protection (spectacles or goggles).
    (j) Non-side shield spectacles are available for frontal 
protection only, but are not acceptable eye protection for the 
sources and operations listed for ``impact.''
    (k) Ventilation should be adequate, but well protected from 
splash entry. Eye and face protection should be designed and used so 
that it provides both adequate ventilation and protects the wearer 
from splash entry.
    (l) Protection from light radiation is directly related to 
filter lens density. See note (d). Select the darkest shade that 
allows task performance.
    9. Selection guidelines for head protection. (a) Hard hats are 
designed to provide protection from impact and penetration hazards 
caused by falling objects. Head protection is also available which 
provides protection from electric shock and burn. When selecting 
head protection, knowledge of potential electrical hazards is 
important. Class A helmets, in addition to impact and penetration 
resistance, provide electrical protection from low-voltage 
conductors. (They are proof tested to 2,200 volts.) Class B helmets, 
in addition to impact and penetration resistance, provide electrical 
protection from high-voltage conductors. (They are proof tested to 
20,000 volts.) Class C helmets provide impact and penetration 
resistance. (They are usually made of aluminum, which conducts 
electricity and should not be used around electrical hazards.)
    (b) Where falling object hazards are present, head protection 
must be worn. Some examples of exposure include: working below other 
workers who are using tools and materials which could fall; working 
around or under conveyor belts which are carrying parts or 
materials; working below machinery or processes which might cause 
material or objects to fall; and working on exposed energized 
conductors.
    (c) Examples of occupations for which head protection should be 
considered are: carpenters, electricians, machinists, boilermakers, 
erectors, plumbers, coppersmiths, ship fitters, welders, laborers 
and material handlers.

[[Page 26358]]

    10. Selection guidelines for foot protection. (a) Safety shoes 
and boots must meet ANSI Z41-1991 and provide impact and compression 
protection to the foot. Where necessary, safety shoes can be 
obtained which provide puncture protection. In some work situations, 
metatarsal protection should be provided, and in some other special 
situations electrical conductive or insulating safety shoes would be 
appropriate.
    (b) Safety shoes or boots with impact protection would be 
required for carrying or handling materials such as packages, 
objects, parts or heavy tools, which could be dropped, and for other 
activities where objects might fall onto the feet. Safety shoes or 
boots with compression protection would be required for work 
activities involving skid trucks (manual material handling carts) 
around bulk rolls (such as paper rolls) and around heavy pipes, all 
of which could potentially roll over an employees' feet. Safety 
shoes or boots with puncture protection would be required where 
sharp objects such as nails, wire, tacks, screws, large staples, 
scrap metal etc., could be stepped on by employees, causing an 
injury.
    (c) Some occupations (not a complete list) for which foot 
protection should be routinely considered are: shipping and 
receiving clerks, stock clerks, carpenters, electricians, 
machinists, boiler makers, plumbers, copper smiths, pipe fitters, 
ship fitters, burners, chippers and grinders, erectors, press 
operators, welders, laborers, and material handlers.
    11. Selection guidelines for hand protection. (a) Gloves are 
often relied upon to prevent cuts, abrasions, burns, and skin 
contact with chemicals that are capable of causing local or systemic 
effects following dermal exposure. OSHA is unaware of any gloves 
that provide protection against all potential hand hazards, and 
commonly available glove materials provide only limited protection 
against many chemicals. Therefore, it is important to select the 
most appropriate glove for a particular application and to determine 
how long it can be worn, and whether it can be reused.
    (b) It is also important to know the performance characteristics 
of gloves relative to the specific hazard anticipated, e.g., 
chemical hazards, cut hazards, and flame hazards. These performance 
characteristics should be assessed by using standard test 
procedures. Before purchasing gloves, the employer should request 
documentation from the manufacturer that the gloves meet the 
appropriate test standard(s) for the hazard(s) anticipated.
    (c) other general factors to be considered for glove selection 
are:
    (A) As long as the performance characteristics are acceptable, 
in certain circumstances, it may be more cost effective to regularly 
change cheaper gloves than to reuse more expensive types; and,
    (B) The work activities of the employee should be studied to 
determine the degree of dexterity required, the duration, frequency, 
and degree of exposure to the hazard, and the physical stresses that 
will be applied.
    (d) With respect to selection of gloves for protection against 
chemical hazards:
    (A) The toxic properties of the chemical(s) must be determined; 
in particular, the ability of the chemical to cause local effects on 
the skin or to pass through the skin and cause systemic effects or 
both;
    (B) Generally, any ``chemical resistant'' glove can be used for 
dry powders;
    (C) For mixtures and formulated products (unless specific test 
data are available), a glove should be selected on the basis of the 
chemical component with the shortest breakthrough time, since it is 
possible for solvents to carry active ingredients through polymeric 
materials; and,
    (D) Employees must be able to remove the gloves in such a manner 
as to prevent skin contamination.
    12. Cleaning and maintenance. (a) It is important that all PPE 
be kept clean and be properly maintained. Cleaning is particularly 
important for eye and face protection where dirty or fogged lenses 
could impair vision.
    (b) For the purposes of compliance, PPE should be inspected, 
cleaned, and maintained at regular intervals so that the PPE 
provides the requisite protection.
    (c) It is important to ensure that contaminated PPE which cannot 
be decontaminated is disposed of in a manner that protects employees 
from exposure to hazards.
    13. Examples of work activities, trades and selection of basic 
PPE.
    Example 1: Welder. Based on an assessment of the work activity 
area hazards to which welders are exposed, the equipment listed 
below is the basic PPE required for this occupation. This does not 
take into account a job location in which additional PPE may be 
required, such as where the welder works from an elevated platform 
without guard rails. In this situation the welder must also wear the 
proper fall protection equipment, such as a body harness.

--Hard hat
--Welding Shield (Face)
--Welding Gloves
--Safety Glasses
--Safety Shoes
--Welding Sleeves (welding in the overhead position)
(Signed and dated)

    Example 2: Yard Maintenance Worker. Based on an assessment of 
the workplace hazards to which shipyard maintenance workers are 
exposed, the equipment listed below is the basic PPE required for 
this occupation. Where maintenance workers are exposed to other 
hazards, such as asbestos, the insulation on a pipe is being 
repaired, maintenance workers must be provided with the appropriate 
supplemental PPE (requirements for asbestos PPE are set out in 
1915.1001).

--Hard Hat
--Safety Glasses
--Work Gloves
--Safety Shoes
(Signed and Dated)

    Example 3: Chipper and Grinder Worker. Based on an assessment of 
the workplace hazards to which shipyard chipper and grinder workers 
are exposed, the equipment listed below is the basic PPE required 
for this occupation. Where workers are exposed to other hazards, 
such as hazardous dust from chipping or grinding operations, chipper 
and grinder workers must be provided with the appropriate 
supplemental PPE.

--Safety Glasses
--Transparent Face Shields
--Hearing Protection
--Foot Protection
--Gloves
(Signed and Dated)

    Example 4: Painter. Based on an assessment of the workplace 
hazards to which shipyard painters are exposed, the equipment listed 
below is the basic PPE required for this occupation. Where painters 
are exposed to other hazards, such as a fall from an elevation where 
no guardrails are present, painters must be provided with the 
appropriate supplemental PPE.

--Hard Hats
--Safety Glasses
--Disposable Clothing
--Gloves
--Respiratory Protection, including Airline Respirators when working 
in Confined Spaces
--Barrier Creams
(Signed and Dated)

    Example 5: Tank Cleaner. Tank cleaning operations and the basic 
PPE required for them depend largely upon the type of cargo shipped 
in the tank. Therefore, the following example is given for a tank in 
which gasoline has been shipped. Based on an assessment of the 
workplace hazards to which shipyard tank cleaners are exposed, 
specifically benzene and flammability hazards, the equipment listed 
below is the basic PPE required for this situation. Other tank 
cleaning operations will require variations in the PPE listed below.

--Respiratory Protection, Airline Respirators for working in 
confined spaces or where personal exposure limits could be exceeded.
--Chemically resistant clothing
--Face Shields
--Chemically resistant boots
--Chemically resistant gloves
--Fall Protection
--Non sparking tools and equipment
--Explosion-proof Lighting
(Signed and Dated)

Appendix B to Subpart I--General Testing Conditions and Additional 
Guidelines for Personal Fall Protection Systems (Non-mandatory)

    1. Personal fall arrest systems--(a) General test conditions. 
(1) Lifelines, lanyards, and deceleration devices should be attached 
to an anchorage and connected to the body-belt or body harness in 
the same manner as they would be when used to protect employees, 
except that lanyards should be tested only when connected directly 
to the anchorage, and not when connected to a lifeline.
    (2) The anchorage should be rigid, and should not have a 
deflection greater than .04 inches (1 cm) when a force of 2,250 
pounds (10 Kn) is applied.
    (3) The frequency response of the load measuring instrumentation 
should be 100 Hz.
    (4) The test weight used in the strength and force tests should 
be a rigid, metal cylindrical or torso-shaped object with a girth of 
38

[[Page 26359]]

inches plus or minus 4 inches (96.5 cm plus or minus 10 cm).
    (5) The lanyard or lifeline used to create the free fall 
distance should be the one supplied with the system, or in its 
absence, the least elastic lanyard or lifeline available to be used 
by the employee with the system.
    (6) The test weight for each test should be hoisted to the 
required level and should be quickly released without having any 
appreciable motion imparted to it.
    (7) The system's performance should be evaluated, taking into 
account the range of environmental conditions for which it is 
designed to be used.
    (8) Following the test, the system need not be capable of 
further operation.
    (b) Strength test. (1) During the testing of all systems, a test 
weight of 300 pounds plus or minus 5 pounds (136 kg plus or minus 
2.27 kg) should be used. (See paragraph (a)(4) above.)
    (2) The test consists of dropping the test weight once. A new 
unused system should be used for each test.
    (3) For lanyard systems, the lanyard length should be 6 feet 
plus or minus 2 inches (1.83 m plus or minus 5 cm) as measured from 
the fixed anchorage to the attachment on the body belt or harness.
    (4) For rope-grab-type deceleration systems, the length of the 
lifeline above the center line of the grabbing mechanism to the 
lifeline's anchorage point should not exceed 2 feet (0.61 m).
    (5) For lanyard systems, for systems with deceleration devices 
which do not automatically limit free fall distance to 2 feet (0.61 
m) or less, and for systems with deceleration devices which have a 
connection distance in excess of 1 foot (0.3 m) (measured between 
the centerline of the lifeline and the attachment point to the body 
belt or harness), the test weight should be rigged to free fall a 
distance of 7.5 feet (2.3 m) from a point that is 1.5 feet (46 cm) 
above the anchorage point, to its hanging location (6 feet (1.83 m) 
below the anchorage). The test weight should fall without 
interference, obstruction, or hitting the floor or the ground during 
the test. In some cases, a non-elastic wire lanyard of sufficient 
length may need to be added to the system (for test purposes) to 
create the necessary free fall distance.
    (6) For deceleration device systems with integral lifelines or 
lanyards which automatically limit free fall distance to 2 feet 
(0.61 m) or less, the test weight should be rigged to free fall a 
distance of four feet (1.22 m).
    (7) Any weight which detaches from the belt or harness should 
constitute failure for the strength test.
    (c) Force test general. The test consists of dropping the 
respective test weight once. A new, unused system should be used for 
each test.
    (1) For lanyard systems. (i) A test weight of 220 pounds plus or 
minus three pounds (100 kg plus or minus 1.6 kg) should be used (see 
paragraph (a)(4) above).
    (ii) Lanyard length should be 6 feet plus or minus 2 inches 
(1.83 m plus or minus 5 cm) as measured from the fixed anchorage to 
the attachment on the body belt or body harness.
    (iii) The test weight should fall free from the anchorage level 
to its handling location (a total of 6 feet (1.83 m) free fall 
distance) without interference, obstruction, or hitting the floor or 
ground during the test.
    (2) For all other systems. (i) A test weight of 220 pounds plus 
or minus 3 pounds (100 kg plus or minus 1.6 kg) should be used (see 
paragraph (a)(4) above).
    (ii) The free fall distance to be used in the test should be the 
maximum fall distance physically permitted by the system during 
normal use conditions, up to a maximum free fall distance for the 
test weight of 6 feet (1.83 m), except as follows:
    (A) For deceleration systems which have a connection link or 
lanyard, the test weight should free fall a distance equal to the 
connection distance (measured between the center line of the 
lifeline and the attachment point to the body belt or harness).
    (B) For deceleration device systems with integral life lines or 
lanyards which automatically limit free fall distance to 2 feet 
(0.61 m) or less, the test weight should free fall a distance equal 
to that permitted by the system in normal use. (For example, to test 
a system with a self-retracting lifeline or lanyard, the test weight 
should be supported and the system allowed to retract the lifeline 
or lanyard as it would in normal use. The test weight would then be 
released and the force and deceleration distance measured.)
    (3) Failure. A system fails the force test if the recorded 
maximum arresting force exceeds 1,260 pounds (5.6 Kn) when using a 
body belt, or exceeds 2,520 pounds (11.2 Kn) when using a body 
harness.
    (4) Distances. The maximum elongation and deceleration distance 
should be recorded during the force test.
    (d) Deceleration device tests--general. The device should be 
evaluated or tested under the environmental conditions (such as 
rain, ice, grease, dirt, type of lifeline, etc.) for which the 
device is designed.
    (1) Rope-grab-type deceleration devices. (i) Devices should be 
moved on a lifeline 1,000 times over the same length of line a 
distance of not less than 1 foot (30.5 cm), and the mechanism should 
lock each time.
    (ii) Unless the device is permanently marked to indicate the 
type of lifelines which must be used, several types (different 
diameters and different materials) of lifelines should be used to 
test the device.
    (2) Other-self-activating-type deceleration devices. The locking 
mechanisms of other self-activating-type deceleration devices 
designed for more than one arrest should lock each of 1,000 times as 
they would in normal service.
    2. Positioning device systems--(a) Test Conditions. (1) The 
fixed anchorage should be rigid and should not have a deflection 
greater than .04 inches (1 cm) when a force of 2,250 pounds (10 Kn) 
is applied.
    (2) For linemen's body belt and pole straps, the body belt 
should be secured to a 250 pound (113 kg) bag of sand at a point 
which simulates the waist of an employee. One end of the pole strap 
should be attached to the rigid anchorage and the other end to the 
body belt. The sand bag should be allowed to free fall a distance of 
4 feet (1.2 m). Failure of the pole strap and body belt should be 
indicated by any breakage or slippage sufficient to permit the bag 
to fall free to the ground.
    (3) For window cleaner's belts, the complete belt should 
withstand a drop test consisting of a 250 pound (113 kg) weight 
falling free for a distance of 6 feet (1.83 m). The weight should be 
a rigid object with a girth of 38 inches plus or minus four inches 
(97 cm plus or minus 10 cm). The weight should be placed in the 
waistband with the belt buckle drawn firmly against the weight, as 
when the belt is worn by a window cleaner. One belt terminal should 
be attached to a rigid anchor and the other terminal should hang 
free. The terminals should be adjusted to their maximum span. The 
weight fastened in the freely suspended belt should then be lifted 
exactly 6 feet (1.83 m) above its ``at rest'' position and released 
so as to permit a free fall of 6 feet (1.83 m) vertically below the 
point of attachment of the terminal anchor. The belt system should 
be equipped with devices and instrumentation capable of measuring 
the duration and magnitude of the arrest forces. Any breakage or 
slippage which permits the weight to fall free of the system 
constitutes failure of the test. In addition, the initial and 
subsequent arresting force peaks should be measured and should not 
exceed 2,000 pounds (8.9 Kn) for more than 2 milliseconds for the 
initial impact, nor exceed 1,000 pounds (4.45 Kn) for the remainder 
of the arrest time.
    (4) All other positioning device systems (except for restraint 
line systems) should withstand a drop test consisting of a 250 pound 
(113 kg) weight falling free for a distance of 4 feet (1.2 m). The 
weight should be a rigid object with a girth of 38 inches plus or 
minus 4 inches (96 cm plus or minus 10 cm). The body belt or harness 
should be affixed to the test weight as it would be to an employee. 
The system should be connected to the rigid anchor in the manner 
that the system would be connected in normal use. The weight should 
be lifted exactly 4 feet (1.2 m) above its ``at rest'' position and 
released so as to permit a vertical free fall of 4 feet (1.2 m ). 
Any breakage or slippage which permits the weight to fall free to 
the ground should constitute failure of the system.

    10. Section Sec. 1915.5 is revised as follows:

Sec. 1915.5  Incorporation by reference.

    (a) Specifications, standards, and codes of agencies of the U.S. 
Government, to the extent specified in the text, form a part of the 
regulations of this part. In addition, under the authority vested in 
the Secretary under the Act, the specifications, standards, and codes 
of organizations which are not agencies of the U.S. Government, in 
effect on the date of the promulgation of the regulations of this part 
as listed below, to the extent specified in the text, form a part of 
the regulations of this part.
    (b) The materials listed in paragraph (d) of this section are 
incorporated by reference in the corresponding sections noted as they 
exist on the date of the approval, and a notice of any change in

[[Page 26360]]

these materials will be published in the Federal Register. These 
incorporations by reference were approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.
    (c) Copies of the following standards that are issued by the 
respective private standards organizations may be obtained from the 
issuing organizations. The materials are available for purchase at the 
corresponding addresses of the private standards organizations noted 
below. In addition, all are available for inspection at the Office of 
the Federal Register, 800 North Capitol Street, NW., suite 700, 
Washington DC, and through the OSHA Docket Office, room N2625, U.S. 
Department of Labor, 200 Constitution Ave., NW, Washington, DC 20210, 
or any of its regional offices.
    (d)(1) The following material is available for purchase from the 
American National Standards Institute, 11 West 42nd Street, New York, 
NY 10036.
    (i) ANSI A14.1-1959 Safety Code for Portable Wood Ladders, IBR 
approved for Sec. 1915.72(a)(6)
    (ii) ANSI A14.2-1956 Safety Code for Portable Metal Ladders, IBR 
approved for Sec. 1995.72(a)(4)
    (iii) ANSI B7.1-1964 Safety Code for the Use, Care, and Protection 
of Abrasive Wheels, IBR approval for Sec. 1915.134(c)
    (iv) ANSI Z87.1-1989 Practice for Occupational and Educational Eye 
and Face Protection, IBR approved for Sec. 1915.153(b)(1).
    (v) ANSI 87.1-1979 Practice for Occupational and Educational Eye 
and Face Protection, IBR approved for Sec. 1915.153(b)(2)
    (vi) ANSI Z89.1-1986 Personnel Protection--Protective Headgear for 
Industrial Workers Requirements, IBR approved for Sec. 1915.155(b)(1)
    (vii) ANSI Z89.1-1969 Safety Requirement for Industrial Head 
Protection, IBR approved for Sec. 1915.155(b)(2).
    (viii) ANSI Z41-1991 Personal Protection--Protective Footwear, IBR 
approved for Sec. 1915.156(b)(1)
    (ix) ANSI Z41-1983 Personal Protection--Protective Footwear, IBR 
approved for Sec. 1915.156(b)(2).
    (2) The following material is available for purchase from the 
American Society of Mechanical Engineers, 345 East 47th Street, New 
York, New York 10017:
    (i) ASME Boiler and Pressure Vessel Code, Section VIII, Rules for 
Construction of Unfired Pressure Vessels, 1963, IBR approved for 
Sec. 1915.172(a).
    (3) The following material is available for purchase from the 
American Conference of Governmental Industrial Hygienists (ACGIH), 1014 
Broadway, Cincinnati, OH 45202:
    (i) Threshold limit values, 1970, IBR approved for Secs. 1915.12(b) 
and 1915.1000, table Z.

[FR Doc. 96-12573 Filed 5-23-96; 8:45 am]
BILLING CODE 4510-26-P

Complete official Federal Register PDF

FR Doc. 96-12548 Veterans and Dependents Education: Miscellaneous
[Federal Register Volume 61, Number 102 (Friday, May 24, 1996)]
[Rules and Regulations]
[Pages 26107-26117]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-12548]

-----------------------------------------------------------------------

DEPARTMENT OF VETERANS AFFAIRS
38 CFR Part 21

RIN 2900-AH60

Veterans and Dependents Education: Miscellaneous

AGENCY: Department of Veterans Affairs.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document amends the educational assistance regulations. 
It removes ``sunsetted'' provisions that had been authorized by the 
Vietnam Era GI Bill. Under the Vietnam Era GI Bill, no benefits can be 
authorized for training that occurred after December 31, 1989, and no 
educational loans can be authorized for training that occurred after 
December 31, 1991. Consequently, the provisions concerning such 
educational assistance are removed because they are no longer of any 
effect. This document also amends the educational assistance 
regulations by placing virtually all of the provisions relating solely 
to benefits under the Survivors' and Dependents' Educational Assistance 
program in one subpart, 38 CFR Part 21, Subpart C. Further, this 
document removes regulations in 38 CFR Part 21, Subpart E concerning 
civil rights matters since they are duplicative of provisions in 38 CFR 
Parts 18, 18a, and 18b. In addition, this document removes 38 CFR Part 
21, Subpart F-2 concerning special benefits for certain

[[Page 26108]]

former military officers since the deadline for applying for such 
benefits has expired and no further benefits can be paid. The 
educational assistance regulations are further amended by removing a 
number of other provisions that no longer apply or otherwise have no 
substantive effect and by making changes for purposes of clarification.

EFFECTIVE DATE: May 24, 1996.

FOR FURTHER INFORMATION CONTACT: June C. Schaeffer, Assistant Director 
for Policy and Program Administration, Education Service, Veterans 
Benefits Administration, 202-273-7187.

SUPPLEMENTARY INFORMATION: This document affects 38 CFR part 21, 
subparts B, C, D, E, F, F-2, and K. It removes provisions that are 
obsolete, duplicative, or without substantive effect; moves provisions 
from one subpart to another; and makes changes for clarification. This 
document makes no substantive changes. Accordingly, there is a basis 
for dispensing with prior notice and comment and delayed effective date 
provisions of 5 U.S.C. 552 and 553.
    The Secretary of Veterans Affairs hereby certifies that this final 
rule will not have a significant economic impact on a substantial 
number of small entities as they are defined in the Regulatory 
Flexibility Act, 5 U.S.C 601-612. This final rule makes no substantive 
changes. Pursuant to 5 U.S.C. 605(b), this final rule, therefore, is 
exempt from the initial and final regulatory flexibility analyses 
requirements of sections 603 and 604.
    The Catalog of Federal Domestic Assistance numbers for the programs 
affected by these regulations are 64.117 and 64.124.

List of Subjects in 38 CFR Part 21

    Administrative practice and procedure, Armed forces, Civil rights, 
Claims, Colleges and universities, Conflict of interests, Defense 
Department, Education, Employment, Grant programs-education, Grant 
programs-veterans, Health care, Loan programs-education, Loan programs-
veterans, Manpower training programs, Reporting and recordkeeping 
requirements, Schools, Travel and transportation expenses, Veterans, 
Vocational education, Vocational rehabilitation.

    Approved: May 13, 1996.
Jesse Brown,
Secretary of Veterans Affairs.

    For the reasons set out in the preamble, 38 CFR part 21 is amended 
as set forth below.

PART 21--VOCATIONAL REHABILITATION AND EDUCATION

Subpart B--Claims and Applications for Educational Assistance

    1. The authority citation for subpart B is revised to read as 
follows:

    Authority: 38 U.S.C. 501(a), ch. 51, unless otherwise noted.

    2. The heading for subpart B is revised to read as set forth above.
    3. The undesignated center heading preceding Sec. 21.1020, 
Secs. 21.1020 through 21.1022, Sec. 21.1025, the undesignated center 
heading preceding Sec. 21.1040, and Secs. 21.1040 through 21.1045 are 
removed.

Subpart C--Survivors' and Dependents' Educational Assistance under 
38 U.S.C. Chapter 35

    4. The authority citation for subpart C is revised to read as 
follows:

    Authority: 38 U.S.C. 501(a), 512, 3500-3566, unless otherwise 
noted.

    5. Sections 21.3001 and 21.3002 are added, to read as follows:

Sec. 21.3001  Delegation of authority.

    Except as otherwise provided, authority is delegated to the Under 
Secretary for Benefits and to supervisory or administrative personnel 
within the jurisdiction of the Education Service, Veterans Benefits 
Administration, designated by him or her to make findings and decisions 
under 38 U.S.C. chapter 35 and the applicable regulations, precedents 
and instructions, as to the program authorized by this subpart.

(Authority: 38 U.S.C. 512(a))

Sec. 21.3002  Administration of Survivors' and Dependents' Educational 
Assistance Program.

    Subpart D of this part applies to the Survivors' and Dependents' 
Educational Assistance Program, unless the provisions of a section in 
that subpart are explicitly limited to one or more of the other 
educational assistance programs VA administers.

(Authority: 38 U.S.C. 501, 3501-3566)

    6. In Sec. 21.3021, paragraphs (h), (i), (j), and (k) are added 
prior to the cross references, to read as follows:

Sec. 21.3021  Definitions.

* * * * *
    (h) Program of education. The term program of education means any 
curriculum or any combination of unit courses or subjects pursued at an 
educational institution which is generally accepted as necessary to 
fulfill the requirements for the attainment of a predetermined and 
identified educational, professional, or vocational objective.

(Authority: 38 U.S.C. 3501(a)(5))

    (i) Educational objective. An educational objective is one that 
leads to the awarding of a diploma, degree, or certificate which 
reflects educational attainment.

(Authority: 38 U.S.C. 3501(a)(5))

    (j) Professional or vocational objective. A professional or 
vocational objective is one that leads to an occupation. It may include 
educational objectives essential to prepare for the chosen occupation. 
When a program consists of a series of courses not leading to an 
educational objective, such courses must be directed toward attainment 
of a designated professional or vocational objective.

(Authority: 38 U.S.C. 3501(a)(5))

    (k) Additional definitions. The definitions in Sec. 21.4200 apply 
to subpart C of this part.

(Authority: 38 U.S.C. 501, 3501)
* * * * *
    7. Section 21.3025 is revised to read as follows:

Sec. 21.3025  Nonduplication; Federal programs.

    Payment of subsistence allowance and special training allowance is 
prohibited to an otherwise eligible person--
    (a) Who is on active duty and is pursuing a course of education 
which is being paid for by the Armed Forces (or by the Department of 
Health and Human Services in the case of the Public Health Service); or
    (b) For a unit course or courses which are being paid for under 5 
U.S.C. chapter 41.

(Authority: 38 U.S.C. 3681(a))

Sec. 21.3032  [Amended]

    8. In Sec. 21.3032, paragraph (a)(2) is amended by removing 
``Sec. 21.4105'' and adding, in its place, ``Sec. 21.3104''.
    9. In Sec. 21.3040, an authority citation is added following 
paragraph (d), to read as follows:

Sec. 21.3040  Eligibility; child.

* * * * *
    (d) * * *

(Authority: 38 U.S.C. 3512(a))

Sec. 21.3041  [Amended]

    10. In Sec. 21.3041, paragraph (d)(9)(iii) is amended by removing 
``eligibility'' and adding, in its place ``eligibility'' and by 
removing ``Sec. 21.4135(z)'' and adding, in its place, 
``Sec. 21.3135(g)''.

[[Page 26109]]

    11. In Sec. 21.3042, paragraph (d) is removed; and paragraph (a) is 
revised to read as follows:

Sec. 21.3042  Service with Armed Forces.

    (a) No educational assistance under 38 U.S.C. chapter 35 may be 
provided an otherwise eligible person during any period he or she is on 
duty with the Armed Forces. See Sec. 21.3021 (e) and (f). This does not 
apply to brief periods of active duty for training. See 
Sec. 21.3135(f).

(Authority: 38 U.S.C. 3501(d))
* * * * *

Sec. 21.3044  [Amended]

    12. In Sec. 21.3044, paragraph (c)(1) is amended by removing 
``Sec. 21.4237(d)'' and adding, in its place, ``Sec. 21.3344(d)''.

Sec. 21.3045  [Amended]

    13. In Sec. 21.3045, the introductory text of paragraph (b)(1) and 
the introductory text of paragraph (b)(2) are amended by removing 
``21.4235 of this part'' each time it appears and adding, in its place, 
``21.3344''; and paragraph (b)(2)(i) is amended by removing 
``21.4137(a)'' and adding, in its place, ``21.3131(a)''.
    14. An undesignated center heading and Secs. 21.3100, 21.3102, 
21.3103, 21.3104, and 21.3105 are added to read as follows:

Counseling

Sec. 21.3100  Counseling.

    (a) Purpose of counseling. The purpose of counseling is to assist:
    (1) In selecting an educational or training objective;

(Authority: 38 U.S.C. 3520)
    (2) In developing a suitable program of education or training;

(Authority: 38 U.S.C. 3520)

    (3) In selecting an educational institution or training 
establishment appropriate for the attainment of the educational or 
training objective;

(Authority: 38 U.S.C. 3561(a))

    (4) In resolving any personal problems which are likely to 
interfere with successful pursuit of a program;

(Authority: 38 U.S.C. 3561(a))

    (5) In selecting an employment objective for the eligible person 
that would be likely to provide the eligible person with satisfactory 
employment opportunities in light of his or her circumstances.

(Authority: 38 U.S.C. 3520, 3561(a))

    (b) Availability of counseling. Counseling assistance is available 
for--
    (1) Identifying and removing reasons for academic difficulties 
which may result in interruption or discontinuance of training; or
    (2) In considering changes in career plans, and making sound 
decisions about the changes.

(Authority: 38 U.S.C. 3520, 3561(a))

    (c) Provision of counseling. VA shall provide counseling as needed 
for the purposes identified in paragraphs (a) and (b) of this section 
upon the request of the eligible person.

(Authority: 38 U.S.C. 3520, 3561(a))

Sec. 21.3102  Required counseling.

    (a) Child. The VA counseling psychologist will provide counseling 
and assist in preparing the educational plan only if the eligible child 
or his or her parent or guardian requests assistance, except that 
counseling is required for an eligible child if--
    (1) The eligible child may require specialized vocational training 
or special restorative training; or
    (2) The eligible child has reached the compulsory school attendance 
age under State law, but has neither reached his or her 18th birthday, 
nor completed secondary schooling. See Sec. 21.3040(a).
    (b) Spouse or surviving spouse. Counseling is required for a spouse 
or surviving spouse only if he or she desires specialized vocational 
training.

(Authority: 38 U.S.C. 3520, 3536, 3541, 3561)

Sec. 21.3103  Failure to cooperate.

    VA will not act further on an eligible person's application for 
assistance under 38 U.S.C. chapter 35 when counseling is required for 
him or her and the eligible person--
    (a) Fails to report;
    (b) Fails to cooperate in the counseling process; or
    (c) Does not complete counseling to the extent required under 
Sec. 21.3102.

(Authority: 38 U.S.C. 3536, 3541, 3561(a))

Sec. 21.3104  Special training.

    (a) Initial counseling. A counseling psychologist in the Vocational 
Rehabilitation and Counseling Division will counsel a disabled child, 
spouse, or surviving spouse before referring the case to the Vocational 
Rehabilitation Panel (established under Sec. 21.60) for consideration 
as to the child's, spouse's or surviving spouse's need for a course of 
specialized vocational training or the child's need for special 
restorative training. After consulting with the panel, and considering 
the panel's report, the counseling psychologist will determine if the 
disabled child, spouse, or surviving spouse needs a course of 
specialized vocational training or the disabled child needs special 
restorative training, and where need is found to exist will prescribe a 
course which is suitable to accomplish the goals of 38 U.S.C. chapter 
35.

(Authority: 38 U.S.C. 3536, 3540-3543, 3561(a))

    (b) Counseling after special restorative training. When an eligible 
child completes or discontinues a course of special restorative 
training without having selected an objective and a program of 
education, a counseling psychologist in the Vocational Rehabilitation 
and Counseling Division will provide additional counseling to assist 
the child in selecting a program of education suitable to accomplish 
the purposes of 38 U.S.C. chapter 35.

(Authority: 38 U.S.C. 3561)

Sec. 21.3105  Travel expenses.

    (a) General. VA shall determine and pay the necessary expense of 
travel to and from the place of counseling for an eligible person who 
is required to receive counseling as provided under 38 U.S.C. 111 (a), 
(d), (e), and (g).

(Authority: 38 U.S.C. 111 (a), (d), (e), and (g))

    (b) Restriction. VA will not pay the necessary cost of travel to 
and from the place of counseling when counseling is not required, but 
is provided as a result of a voluntary request by the eligible person.

(Authority: 38 U.S.C. 111)

    15. Sections 21.3130 and 21.3131 are added following the 
undesignated center heading that precedes Sec. 21.3145, to read as 
follows:

Sec. 21.3130  Educational assistance.

    (a) Approval of a program of education. VA will approve a program 
of education selected by an eligible person if:
    (1) The program is described in Sec. 21.3021 (h) and (i) or (j);
    (2) The individual is not already qualified for the objective of 
the program of education;
    (3) The proposed educational institution or training establishment 
is in compliance with all the requirements of 38 U.S.C. chapters 35 and 
36; and
    (4) It does not appear that the enrollment in or pursuit of such 
person's program of education would violate any provision of 38 U.S.C. 
chapters 35 and 36.

(Authority: 38 U.S.C. 3521)
    (b) Payments. VA will pay educational assistance at the rate 
specified in Sec. 21.3131 (subject to the reductions required by 
Sec. 21.3132) while the eligible person is pursuing an approved program 
of education or training.

(Authority: 38 U.S.C. 3521, 3532)

[[Page 26110]]

    (c) No payment for excessive training. (1) VA will make no payment 
for:
    (i) Training in an apprenticeship or other on-job training program 
in excess of the number of hours approved by the State approving agency 
or VA; or
    (ii) Lessons completed in a correspondence course in excess of the 
number approved by the State approving agency.
    (2) A school's standards of progress may permit a student to repeat 
a course or portion of a course in which he or she has done poorly. VA 
considers the repeated courses to be part of the program of education. 
VA will make no payment for courses or training if the courses or 
training are not part of the eligible person's program of education.

(Authority: 38 U.S.C. 3501(a)(5), 3521)

    (d) Courses precluded. VA may not pay educational assistance:
    (1) For pursuit of a course if approval of the enrollment in the 
course is precluded by Sec. 21.4252;
    (2) For training in a foreign country unless the training is in the 
Philippines or is approved pursuant to the provisions of Sec. 21.4260; 
or
    (3) For pursuit of a course offered by open-circuit television, 
unless the eligible person's pursuit meets the requirements of 
Sec. 21.4233(c).

(Authority: 38 U.S.C. 3523)

    (e) Commencing date. In determining the commencing date of an award 
of educational assistance, VA will apply the provisions of 
Sec. 21.4131.

(Authority: 38 U.S.C. 5113)

Sec. 21.3131  Rates--educational assistance allowance--38 U.S.C. 
chapter 35.

    (a) Rates. Except as provided in Sec. 21.3132, educational 
assistance allowance is payable at the following rates effective 
January 1, 1990:

------------------------------------------------------------------------
              Type of courses                       Monthly rate        
------------------------------------------------------------------------
Institutional:                                                          
  Full time...............................  $404                        
  \3/4\ time..............................  304                         
  \1/2\ time..............................  202                         
  Less than \1/2\ but more than \1/4\ time  202                         
   \3\.                                                                 
  \1/4\ time or less \3\..................  101                         
  Cooperative (other than farm              $327                        
   cooperative) (Full time only).                                       
  Apprentice or On-Job (full time only,                                 
   but see footnote \1\)                                                
  First six months........................  $294                        
  Second six months.......................  220                         
  Third six months........................  146                         
  Fourth six months and thereafter........  73                          
Farm Cooperative:                                                       
  Full time...............................  $327                        
  \3/4\ time..............................  245                         
  \1/2\ time..............................  163                         
Correspondence............................  55 percent of the           
                                             established charge for the 
                                             number of lessons completed
                                             by the eligible spouse or  
                                             surviving spouse and       
                                             serviced by the school--   
                                             Allowance paid             
                                             quarterly.\2\              
------------------------------------------------------------------------
\1\ See footnote 5 of Sec.  21.4270(c) for measurement of full time and 
  Sec.  21.3132(c) for proportionate reduction in award for completion  
  of less than 120 hours per month.                                     
\2\ Established charge means the charge for the course or courses       
  determined on the basis of the lowest extended time payment plan      
  offered by the institution and approved by the appropriate State      
  approving agency or the actual cost to the eligible spouse or         
  surviving spouse, whichever is the lesser. VA considers the continuity
  of an enrollment broken when there are more than 6 months between the 
  servicing of the lessons.                                             
\3\ If an eligible person under chapter 35 pursuing independent study on
  a less than one-half-time basis completes his or her program before   
  the designated completion time, his or her award will be recomputed to
  permit payment of tuition and fees not to exceed $202 or $101 as      
  appropriate, per month, if the maximum allowance is not initially     
  authorized.                                                           

(Authority: 38 U.S.C. 3532, 3686)

    (b) Less than half time. The monthly rate for an eligible person 
who is pursuing an institutional course on less than one-half time 
basis may not exceed the monthly rate of the cost of the course 
computed on basis of the total cost for tuition and fees which the 
school requires similarly circumstanced individuals enrolled in the 
same course to pay. ``Cost of the course'' does not include the cost of 
books or supplies which the student is required to purchase at his or 
her own expense.

(Authority: 38 U.S.C. 3532(a)(2))

    (c) Courses leading to a secondary school diploma or equivalency 
certificate. The monthly rate of Survivors' and Dependents' Educational 
Assistance payable for an eligible person enrolled in a course leading 
to a secondary school diploma or equivalency certificate shall be the 
rate for institutional training stated in paragraph (a) of this 
section.

(Authority: 38 U.S.C. 3532(d), 3533)

    (d) Payments made to eligible persons in the Republic of the 
Philippines or to certain Filipinos. When the eligible person is 
pursuing training at an institution located in the Republic of the 
Philippines or when an eligible child's entitlement is based on the 
service of a veteran in the Philippine Commonwealth Army, or as a 
Philippine Scout as defined in Sec. 3.8 (b), (c), or (d) of this 
chapter, payments of educational assistance allowance made after 
December 31, 1994, will be made at the rate of 50 cents for each dollar 
authorized.

(Authority: 38 U.S.C. 3532(d), 3565)

Sec. 21.4137  [Redesignated as Sec. 21.3132]

Sec. 21.3132  [Amended]

    16. Section 21.4137 is redesignated as Sec. 21.3132; paragraphs (d) 
through (g) are removed; paragraph (h) is redesignated as paragraph 
(d); newly redesignated paragraph (d)(4) is amended by removing ``106'' 
and adding, in its place, ``1606''; newly redesignated paragraphs 
(d)(4) and (d)(5) are amended by removing ``(h)(1)(ii)'' in each place 
it appears and adding, in its place, ``(d)(1)(ii)''; paragraphs (i) 
through (o) are removed; and the section heading is revised, 
introductory text is added, and paragraphs (a) through (c) are revised, 
to read as follows:

Sec. 21.3132  Reductions in Survivors' and Dependents' Educational 
Assistance.

    The monthly rates established in Sec. 21.3131 shall be reduced as 
stated in this section whenever the circumstances described in this 
section arise.
    (a) No educational assistance allowance for some incarcerated 
eligible persons. VA will pay no educational assistance allowance to an 
eligible person who:
    (1) Is incarcerated in a Federal, State, or local penal institution 
for conviction of a felony; and
    (2) Is enrolled in a course:
    (i) For which there are no tuition or fees, or charges for books, 
supplies, and equipment; or
    (ii) For which tuition and fees are being paid by a Federal program 
(other than one administered by VA) or by a State or local program, and 
the eligible person is incurring no charge for the books, supplies, and 
equipment necessary for the course.

(Authority: 38 U.S.C. 3532(e))

    (b) Reduced educational assistance allowance for some incarcerated 
eligible persons--felony conviction. (1) VA will pay a reduced 
educational assistance allowance to an eligible person who:
    (i) Is incarcerated in a Federal, State, or local penal institution 
for conviction of a felony; and
    (ii) Is enrolled in a course:
    (A) For which the eligible person pays some (but not all) of the 
charges for tuition and fees; or
    (B) For which a Federal program (other than one administered by VA) 
or a State or local program pays all the

[[Page 26111]]

charges for tuition and fees, but which requires the eligible person to 
pay for books, supplies, and equipment.
    (2) The monthly rate of educational assistance allowance payable to 
such an eligible person who is pursuing a course on a half-time or 
greater basis shall be the lesser of the following:
    (i) The monthly rate of the portion of the tuition and fees that 
the eligible person must pay plus the monthly rate of the charge to the 
eligible person for the cost of necessary supplies, books, and 
equipment; or
    (ii) The monthly rate stated in Sec. 21.3131.
    (3) The monthly rate of educational assistance payable to such an 
eligible person who is pursuing the course on a less than half-time 
basis or on a one quarter-time basis shall be the lowest of the 
following:
    (i) The monthly rate of the tuition and fees charged for the 
course;
    (ii) The monthly rate of tuition and fees which the eligible person 
must pay plus the monthly rate of the charge to the eligible person for 
the cost of necessary supplies, books, and equipment; or
    (iii) The monthly rate stated in Sec. 21.3131.

(Authority: 38 U.S.C. 3482(g))

    (c) Reduction in training assistance allowance. (1) For any month 
in which an eligible person pursuing an apprenticeship or on-job 
training program fails to complete 120 hours of training, VA shall 
reduce the rate specified in Sec. 21.3131(a) proportionally. In this 
computation VA shall round the number of hours worked to the nearest 
multiple of eight.
    (2) For the purpose of this paragraph hours worked include only:
    (i) The training hours the eligible person worked; and
    (ii) All hours of the eligible person's related training which 
occurred during the standard workweek and for which the eligible person 
received wages.

(Authority: 38 U.S.C. 3687(b)(3))
* * * * *
    17. Section 21.3133 is added to read as follows:

Sec. 21.3133  Payment procedures.

    (a) Release of payments and payment procedures. In determining 
whether payments of educational assistance allowance may be made in a 
lump sum, in advance, for an interval or if a certification is required 
from an eligible person before a payment may be made, VA will apply the 
provisions of Sec. 21.4138.

(Authority: 38 U.S.C. 3680)

    (b) Payee. (1) VA will pay an educational assistance allowance to 
the eligible person if he or she has attained majority and has no known 
legal disability.
    (2) If an eligible person has not attained majority, VA will pay an 
educational assistance allowance directly to an eligible person, a 
relative, or some other person for the use and benefit of the eligible 
person notwithstanding a legal disability on the part of the eligible 
person when VA determines:
    (i) The best interest of the eligible person would be served;
    (ii) Undue delay in payment would be avoided; or
    (iii) Payment would otherwise not be feasible.

(Authority: 38 U.S.C. 3501(a)(4), 3501(c), 3531(a), 5502)

    (c) Payment of accrued benefits. Educational assistance remaining 
due and unpaid at the date of the eligible person's death is payable 
under the provisions of Sec. 3.1000 of this chapter.

(Authority: 38 U.S.C. 5121)

    (d) Tutorial assistance. An individual who is otherwise eligible to 
receive benefits under the Survivors' and Dependents' Educational 
Assistance program may receive supplemental monetary assistance to 
provide tutorial services. In determining whether VA will pay the 
individual this assistance, VA will apply the provisions of 
Sec. 21.4236.

(Authority: 38 U.S.C. 3492, 3533(b))

    (e) Offsets: 38 U.S.C. chapter 35, compensation, pension and 
dependency and indemnity compensation. Payment of dependents' 
educational assistance will be subject to offset of amounts of pension, 
compensation or dependency and indemnity compensation paid over the 
same period on behalf of a child based on school attendance.

(Authority: 38 U.S.C. 3562)

    (f) Final payment. VA may withhold final payment until VA receives 
proof of continued enrollment and adjusts the eligible person's 
account.

(Authority: 38 U.S.C. 3680)

    18. Section 21.3135 is added to read as follows:

Sec. 21.3135  Reduction or discontinuance dates for awards of 
educational assistance allowance.

    The reduction or discontinuance date of an award of educational 
assistance will be as stated in this section. If more than one basis 
for reduction or discontinuance is involved, the earliest date will 
control.
    (a) Ending date of course. Educational assistance allowance will be 
discontinued on the ending date of the course or period of enrollment 
as certified by the school.

(Authority: 38 U.S.C. 3531, 3680(a))

    (b) Ending date of eligibility. Educational assistance allowance 
will be discontinued on the ending date of the eligible person's 
eligibility as determined by Sec. 21.3041, Sec. 21.3042, Sec. 21.3043, 
or Sec. 21.3046.

(Authority: 38 U.S.C. 3512)

    (c) General reduction or discontinuance dates. Educational 
assistance allowance will be reduced or discontinued on the date 
specified in Sec. 21.4135.

(Authority: 38 U.S.C. 3482(g), 3531, 3671(g), 3672(a), 3680, 3683, 
3690, 5112, 5113, 6103, 6104, 6105)

    (d) Divorce. If the veteran and eligible spouse divorce, the 
discontinuance date for the eligible spouse's award of educational 
assistance will be:
    (1) The end of the quarter or semester if the school is operated on 
a quarter or semester system, and the divorce was without fault on the 
eligible spouse's part;
    (2) The end of the course or a 12-week period, whichever is 
earlier, if the school does not operate on a quarter or semester 
system, and the divorce was without fault on the eligible spouse's 
part; or
    (3) In all other instances, the date the divorce decree becomes 
final.

(Authority: 38 U.S.C. 3501(a)(1)(D), 3511(b))

    (e) Remarriage or other relationship of spouse or surviving spouse. 
(1) If an eligible surviving spouse remarries, the date of 
discontinuance of his or her award of educational assistance allowance 
will be the last date of attendance before remarriage.
    (2) If a spouse or surviving spouse begins a relationship by living 
with another person and holding himself or herself out openly to the 
public to be the spouse of the other person, the date of discontinuance 
of his or her award of educational assistance allowance will be the 
last date of the month before the spouse's or surviving spouse's 
relationship began.

(Authority: 38 U.S.C. 101(3), 3501(a)(1)(B))

    (f) Entrance on active duty (Sec. 21.3042). If an eligible person 
enters on active duty, VA will terminate his or her educational 
assistance allowance on the day before the day of entrance on active 
duty. Brief periods of active duty for training, if the school permits 
such an absence without interruption of

[[Page 26112]]

training, will not result in termination of the allowance under this 
paragraph.

(Authority: 38 U.S.C. 3501(d))

    (g) Eligible child ceases to be a stepchild. When an eligible child 
loses eligibility because he or she ceases to be the stepchild of the 
veteran, VA will discontinue the dependent's educational assistance 
allowance on the last day of the child's eligibility as determined by 
Sec. 21.3041(d)(9).

(Authority: 38 U.S.C. 101(4)(A), 3501)

    (h) Veteran no longer rated permanently and totally disabled. (1) 
If the veteran on whose service an eligible person's eligibility is 
based is no longer permanently and totally disabled, VA will 
discontinue the educational assistance allowance--
    (i) On the last date of the quarter or semester during which VA 
rated the veteran as no longer permanently and totally disabled if the 
eligible person's educational institution is organized on a quarter or 
semester basis; or
    (ii) On the earlier of the following dates when the eligible 
person's educational institution is not organized on a quarter or 
semester basis:
    (A) The last date of the course;
    (B) The end of a 12-week period beginning on the date VA rated the 
veteran as being no longer permanently and totally disabled.

(Authority: 38 U.S.C. 3511(b), 3512(a)(6)(A))

    (i) Serviceperson is removed from ``missing status'' listing. (1) 
If the serviceperson on whose service an eligible person's eligibility 
is based is removed from the ``missing status'' listing, VA will 
discontinue the educational assistance allowance--
    (i) On the last date of the quarter or semester during which the 
serviceperson was removed from the ``missing status'' listing if the 
eligible person's educational institution is organized on a quarter or 
semester basis; or
    (ii) On the earlier of the following dates when the eligible 
person's educational institution is not organized on a quarter or 
semester basis:
    (A) The last date of the course;
    (B) The end of a 12-week period beginning on the date the 
serviceperson was removed from the ``missing status'' listing.

(Authority: 38 U.S.C. 3512(a)(6)(A))

Sec. 21.3145  [Removed]

    19. Section 21.3145 is removed.
    20. In Sec. 21.3330, paragraph (a) is amended by removing 
``Sec. 21.4139'' and adding, in its place, ``Sec. 21.3133(b)''; and 
paragraph (c) is revised to read as follows:

Sec. 21.3330  Payments.

* * * * *
    (c) The provisions of Sec. 21.3133(e) apply to the payment of 
special restorative training allowance.

(Authority: 38 U.S.C. 3562)

Sec. 21.3331  [Amended]

    21. Section 21.3331 is amended by removing ``Sec. 21.4131'', and 
adding, in its place, ``Sec. 21.3130(c)''.

Sec. 21.3332  [Amended]

    22. Section 21.3332 is amended by removing ``Sec. 21.4135'', and 
adding, in its place, ``Sec. 21.3130(d)''.
    23. An undesignated center heading and Sec. 21.3344 are added to 
read as follows:

Special Assistance and Training

Sec. 21.3344  Special assistance for the educationally disadvantaged.

    (a) Enrollment. VA may approve the enrollment of an eligible person 
in an appropriate course or courses at the secondary school level. This 
approval may be made only if the eligible person--
    (1) Has not received a secondary school diploma (or an equivalency 
certificate);
    (2) Needs additional secondary school education, remedial, 
refresher, or deficiency courses, to qualify for admission to an 
appropriate educational institution in a State in order to pursue a 
program of education; and
    (3) Is to pursue the course or courses in a State.

(Authority: 38 U.S.C. 3491(a), 3533)

    (b) Measurement. VA will measure remedial, deficiency, or refresher 
courses offered at the secondary school level as provided in 
Secs. 21.4270(a)(2) and 21.4272(k).

(Authority: 38 U.S.C. 3533)

    (c) Educational assistance. VA will authorize educational 
assistance at the monthly rates specified in Sec. 21.3131.

(Authority: 38 U.S.C. 3491(a), 3533)

    (d) Entitlement charge. The provisions of Sec. 21.3045 will 
determine whether VA will make a charge against the period of the 
entitlement of the eligible person because of enrollment in a course 
under the provisions of this section.

(Authority: 38 U.S.C. 3533)

    (e) Certifications. (1) Certifications of the eligible person's 
need for deficiency or remedial courses in basic English language 
skills and mathematics skills may be made by:
    (i) A VA counseling psychologist in the Vocational Rehabilitation 
and Counseling Division;
    (ii) The educational institution administering the course; or
    (iii) The educational institution where the student has applied for 
admission.
    (2) Certification of need for other refresher, remedial or 
deficiency course requirements are to be made by the educational 
institution--
    (i) Administering the course which the eligible person is planning 
to enter; or
    (ii) Where the eligible person has applied for admission.

(Authority: 38 U.S.C. 3533)

    (f) Basic skills. Basic English language courses or mathematics 
courses will be authorized when it is found by accepted testing methods 
that the eligible person is lacking in basic reading, writing, 
speaking, or essential mathematics.

(Authority: 38 U.S.C. 3533)

Subpart D--Administration of Educational Assistance Programs

    24. The authority citation for subpart D is revised to read as 
follows:

    Authority: 10 U.S.C. ch. 1606; 38 U.S.C. 501(a), chs. 30, 32, 
34, 35, 36, unless otherwise noted.

    25. The heading for subpart D is revised to read as set forth 
above.

Sec. 21.4001  [Amended]

    26. In Sec. 21.4001, paragraph (a) is amended by removing ``Chief 
Benefits Director'' and adding, in its place, ``Under Secretary for 
Benefits''; by removing ``Vocational Rehabilitation and''; and by 
removing ``34, 35,'' and adding, in its place, ``34''; paragraph (b) is 
amended by removing ``Chief, Benefits Director'' and adding, in its 
place, ``Under Secretary for Benefits''; and by removing ``Vocational 
Rehabilitation and''; paragraph (c) introductory text is amended by 
removing ``Vocational Rehabilitation and''; paragraph (d) is amended by 
removing ``Chief Benefits Director'' and adding, in its place, ``Under 
Secretary for Benefits'', and by adding ``his or her'' immediately 
preceding ``designee''; paragraph (e) is amended by removing ``Chief 
Benefits Director'' and adding, in its place, ``Under Secretary for 
Benefits''; paragraph (f) is amended by removing ``Chief Benefits 
Director'' and adding, in its place, ``Under Secretary for Benefits''; 
and paragraph (g) is amended by removing ``Education'' and adding, in 
its place, ``Counseling''.

Sec. 21.4009  [Amended]

    27. In Sec. 21.4009, paragraph (a)(2)(i) is amended by removing 
``excessive absences from a course or''; and by removing ``veteran'' 
and adding, in its place, ``veteran, reservist''.

[[Page 26113]]

Sec. 21.4022  [Amended]

    28. In Sec. 21.4022, the heading for paragraph (a) is removed; 
paragraph (b) is removed; and paragraph (a) introductory text and 
paragraphs (a)(1), (a)(2), (a)(3), (a)(4), (a)(5), (a)(6), (a)(7), 
(a)(8), and (a)(9) are redesignated as introductory text and paragraphs 
(a), (b), (c), (d), (e), (f), (g), (h), and (i), respectively.

Sec. 21.4025  [Removed]

    29. Section 21.4025 is removed.

Secs. 21.4100 through 21.4105 and 21.4130  [Removed]

    30. The undesignated center heading which precedes Sec. 21.4100, 
and Secs. 21.4100 through 21.4105 and Sec. 21.4130 are removed.

Sec. 21.4131  [Amended]

    31. In Sec. 21.4131, paragraphs (e) and (j) are removed and 
reserved; the heading for paragraph (g) is amended by removing 
``(Secs. 21.1042(b), 21.3042(b))''; paragraph (g) is amended by 
removing ``veteran'' and adding, in its place, ``veteran or eligible 
person''; the authority citation for paragraph (g) is amended by 
removing ``3462(b)'' and adding, in its place, ``3462(b), 3501(d)''; 
and paragraph (h), introductory text, is amended by removing 
``Sec. 21.4136 (n), (o), (p), or (r) Sec. 21.4137 (j) or (l)'' and 
adding, in its place, ``Sec. 21.3132(a) or (b) or Sec. 21.5139''.

Sec. 21.4132  [Removed]

    32. Section 21.4132 is removed.
    33. In Sec. 21.4135, paragraphs (b), (c), (d), (n), (o), (v), and 
(z) are removed and reserved; paragraph (e)(2) introductory text is 
amended by removing ``as provided in Sec. 21.4136(k) or 21.4137(h),''; 
paragraph (m)(1) is amended by removing ``Sec. 21.4136(n), (o), (p), or 
(r) or Sec. 21.4137(j) or (l)'' and adding, in its place, 
``Sec. 21.3132(a) or (b) or Sec. 21.5139''; and in paragraph (e), the 
heading and paragraph (e)(1) are revised, to read as follows:

Sec. 21.4135  Discontinuance dates.

* * * * *
    (e) Course discontinued; course interrupted; course terminated; 
course not satisfactorily completed or withdrawn from. (1) If the 
individual receives all nonpunitive grades, or withdraws from all 
courses other than because of being ordered to active duty, and no 
mitigating circumstances are found, VA will terminate the individual's 
educational assistance allowance effective the first date of the term 
in which the withdrawal occurs.
* * * * *
    34. In Sec. 21.4136, paragraphs (a) through (j) are removed; 
paragraph (k) heading, paragraph (k)(1) introductory text, paragraphs 
(k)(1)(i), (k)(1)(ii) introductory text, (k)(1)(ii)(A), (k)(1)(ii)(B), 
(k)(1)(ii)(C), and (k)(2) through (k)(5) are redesignated as paragraph 
(a) heading, paragraph (a) introductory text, paragraphs (a)(1), (a)(2) 
introductory text, (a)(2)(i), (a)(2)(ii), (a)(2)(iii), and (b) through 
(e), respectively; newly redesignated paragraphs (a)(2)(ii) and 
(a)(2)(iii) are amended by removing ``veteran'' wherever it appears and 
adding, in its place, ``individual''; paragraphs (l) through (t) and 
the cross reference at the end of the section are removed; and the 
section heading, the heading and introductory text of newly 
redesignated paragraph (a), the authority citation at the end of newly 
redesignated paragraph (a), and newly redesignated paragraph (a)(1) and 
paragraphs (b) through (e) are revised to read as follows:

Sec. 21.4136  Withdrawals or nonpunitive grades may result in 
nonpayment.

    (a) General. VA will not pay benefits to an individual for a course 
from which the individual withdraws or receives a nonpunitive grade 
which is not used in computing the requirements for graduation unless:
    (1) The individual withdraws because he or she is ordered to active 
duty; or
* * * * *
(Authority: 38 U.S.C. 3680(a))

    (b) Representative mitigating circumstances. The following 
circumstances, which are not all inclusive, are representative of those 
that VA considers to be mitigating provided they prevent the individual 
from pursuing the program of education continuously:
    (1) An illness of the individual;
    (2) An illness or death in the individual's family;
    (3) An unavoidable geographical transfer resulting from the 
individual's employment;
    (4) An unavoidable change in the individual's conditions of 
employment;
    (5) Immediate family or financial obligations beyond the control of 
the individual that require him or her to suspend pursuit of the 
program of education to obtain employment;
    (6) Discontinuance of the course by the school;
    (7) Unanticipated active duty for training;
    (8) Unanticipated difficulties in caring for the individual's child 
or children.

(Authority: 38 U.S.C. 3680(a))

    (c) Failure to complete a course for the educationally 
disadvantaged. If the individual fails to satisfactorily complete a 
course under 38 U.S.C. 3491(a) without fault, VA will consider the 
circumstances that caused the failure to be mitigating. This will be 
the case even if the circumstances were not so severe as to preclude 
continuous pursuit of a program of education.
    (d) Withdrawals after May 31, 1989. In the first instance of a 
withdrawal after May 31, 1989, from a course or courses for which the 
individual received educational assistance under 38 U.S.C. chapter 32, 
VA will consider that mitigating circumstances exist with respect to 
courses totaling not more than six semester hours or the equivalent, 
and paragraphs (a)(2)(ii) and (a)(2)(iii) of this section will not 
apply.

(Authority: 38 U.S.C. 3680(a)(3))

    (e) Withdrawals during a drop-add period. If the individual 
withdraws from a course during a drop-add period, VA will consider the 
circumstances that caused the withdrawal to be mitigating, and 
paragraphs (a)(2)(ii) and (a)(2)(iii) of this section will not apply.

(Authority: 38 U.S.C. 3680(a))

Secs. 21.4139 through 21.4141  [Removed]

    35. Sections 21.4139 through 21.4141 are removed.
    36. In Sec. 21.4145, paragraph (b) is amended by removing 
``veteran'' wherever it appears, and adding, in its place, ``veteran, 
reservist, or eligible person'', and by removing ``veteran's'' and 
adding, in its place, ``veteran's, reservist's, or eligible person's''; 
paragraph (c) introductory text is amended by removing ``Veteran-
student'' and adding, in its place, ``Work-study''; the heading of 
paragraph (g) is amended by removing ``Veteran'' and adding, in its 
place, ``Veteran, reservist, or eligible person''; paragraphs (g) and 
(h) are amended by removing ``veteran'' wherever it appears, and 
adding, in its place, ``veteran, reservist, or eligible person''; 
paragraph (i) is amended by removing ``veterans'' and adding, in its 
place, ``veterans, reservists, or eligible persons''; and the section 
heading and paragraphs (a), (c)(3), (c)(4), (d), (e), and (f) are 
revised, and paragraph (c)(5) is added, to read as follows:

Sec. 21.4145  Work-study allowance.

    (a) Eligibility. (1) A veteran or reservist pursuing a program of 
education under either 38 U.S.C. chapter 30 or 32 or 10 U.S.C. chapter 
1606 at a rate of three-quarter time or full time is eligible to 
receive a work-study allowance.
    (2) An eligible person is eligible to receive a work-study 
allowance when-

[[Page 26114]]

    (i) The eligible person is pursuing a program of education under 38 
U.S.C. chapter 35 on at least a three-quarter-time basis;
    (ii) The eligible person is pursuing a program of education in a 
State; and
    (iii) The eligible person is not pursuing a program of special 
restorative training.

(Authority: 10 U.S.C. 16136; 38 U.S.C. 3034, 3241, 3485, 3537)
* * * * *
    (c) * * *
    (3) Hospital and domiciliary care and medical treatment at VA 
facilities;
    (4) For a reservist training under 10 U.S.C. chapter 1606, 
activities relating to the administration of 10 U.S.C. chapter 1606 at 
Department of Defense facilities, Coast Guard facilities, or National 
Guard facilities; and
    (5) Any other appropriate activity of VA.

(Authority: 10 U.S.C. 16136; 38 U.S.C. 3034, 3241, 3485, 3537)

    (d) Rate of payment. In return for the veteran's, reservist's, or 
eligible person's agreement to perform services for VA totaling not 
more than 25 hours times the number of weeks contained in an enrollment 
period, VA will pay an allowance in an amount equal to the higher of:
    (1) The hourly minimum wage in effect under section 6(a) of the 
Fair Labor Standards Act of 1938 (29 U.S.C. 206(a)) times the number of 
hours the veteran, reservist, or eligible person has agreed to work; or
    (2) The hourly minimum wage under comparable law of the State in 
which the services are to be performed times the number of hours the 
veteran, reservist, or eligible person has agreed to work.

(Authority: 10 U.S.C. 16136; 38 U.S.C. 3034, 3241, 3485, 3537)

    (e) Payment in advance. VA will pay in advance an amount equal to 
the lesser of the following:
    (1) 40 percent of the total amount payable under the contract; or
    (2) An amount equal to 50 times the applicable minimum hourly wage 
in effect on the date the contract is signed.

(Authority: 10 U.S.C. 16136; 38 U.S.C. 3034, 3241, 3485, 3537)

    (f) Veteran, reservist, or eligible person reduces rate of 
training. In the event the veteran, reservist, or eligible person 
reduces his or her training to less than three-quarter-time before 
completing an agreement, the veteran, reservist, or eligible person, 
with the approval of the Director of the VA field station, or designee, 
may be permitted to complete the portions of an agreement in the same 
or immediately following term, quarter, or semester in which the 
veteran, reservist, or eligible person ceases to be a three-quarter-
time student.

(Authority: 10 U.S.C. 16136; 38 U.S.C. 3034, 3241, 3485, 3537)
* * * * *

Sec. 21.4146  [Amended]

    37. In Sec. 21.4146, paragraph (a) is amended by removing 
``Chapters 34, 35 and 36, Title 38, U.S.C.'' and adding, in its place, 
``38 U.S.C. chapters 30, 32, 35, or 36, or 10 U.S.C. chapter 1606''; 
and paragraph (f) is removed.
    38. In Sec. 21.4153, paragraph (b) is amended by removing ``Chief 
Benefits Director'' and adding, in its place, ``Under Secretary for 
Benefits''; and by removing ``Vocational Rehabilitation and''; 
paragraph (c)(2)(i)(B) is amended by removing ``Vocational 
Rehabilitation and''; and paragraph (c)(3) is revised, to read as 
follows:

Sec. 21.4153  Reimbursement of expenses.

* * * * *
    (c) Reimbursable expenses. * * *
    (3) Administrative expenses. In determining the allowance for 
administrative expenses for which payment may be authorized, VA will 
apply the provisions of 38 U.S.C. 3674(b). In making that application, 
VA will determine reimbursable salary cost pursuant to paragraph (c)(1) 
of this section.
* * * * *
    39. In Sec. 21.4200, paragraph (v) is revised to read as follows:

Sec. 21.4200  Definitions.

* * * * *
    (v) Reservist. The term reservist means a member of the Selected 
Reserve of the Ready Reserve of any of the reserve components 
(including the Army National Guard of the United States and the Air 
National Guard of the United States) of the Armed Forces who is 
eligible to receive educational assistance under 38 U.S.C. chapter 30 
or 10 U.S.C. chapter 1606.

(Authority: 38 U.S.C. 3002)

Sec. 21.4201  [Amended]

    40. In Sec. 21.4201, paragraph (g)(6) is amended by removing ``in a 
course either before December 1, 1976 or after November 30, 1976,''.

Sec. 21.4204  [Amended]

    41. In Sec. 21.4204, paragraph (b)(2) is removed; and paragraphs 
(b)(3), (b)(4), (b)(5), and (b)(6) are redesignated as paragraphs 
(b)(2), (b)(3), (b)(4), and (b)(5), respectively.

Sec. 21.4205  [Removed]

    42. Section 21.4205 is removed.

Sec. 21.4209  [Amended]

    43. Section 21.4209 is amended in the heading of paragraph (c) by 
removing ``Below college level'' and adding, in its place, ``Noncollege 
degree''; in paragraph (c) by removing ``veterans or'' and adding, in 
its place, ``veterans, servicemembers, reservists, and/or''; by 
removing ``or courses which do'' and adding, in its place, ``that 
does''; and by removing ``which has enrolled veterans under Chapter 34 
or eligible persons under Chapter 35'' and adding, in its place, ``that 
has enrolled veterans under 38 U.S.C. chapter 30 or 32, reservists 
under 10 U.S.C. chapter 1606, or eligible persons under 38 U.S.C. 
chapter 35''; and, immediately after paragraph (c), by adding an 
authority citation to read

``(Authority: 10 U.S.C. 16136; 38 U.S.C. 3034, 3241, 3690(c))''.

Sec. 21.4230  [Removed]

    44. Section 21.4230 is removed.

Sec. 21.4235  [Removed]

    45. Section 21.4235 is removed.
    46. In Sec. 21.4236, the section heading, the authority citation 
following paragraph (b), and paragraphs (c) and (d) are revised, to 
read as follows:

Sec. 21.4236  Tutorial assistance.

* * * * *
    (b) * * *

(Authority: 10 U.S.C. 16131(h); 38 U.S.C. 3019, 3234, 3492, 3533(b))

    (c) Limits on tutorial assistance. (1) VA will authorize the cost 
of tutorial assistance in an amount not to exceed $100 per month.
    (2) The total amount of all tutorial assistance provided under this 
section will not exceed $1200.

(Authority: 38 U.S.C. 3019, 3492, 3533(b))

    (d) Entitlement charge. VA will make no charge against the 
veteran's or eligible person's entitlement to educational assistance 
for any amount of tutorial assistance authorized.

(Authority: 38 U.S.C. 3019, 3492, 3533(b))

Sec. 21.4237  [Removed]

    47. Section 21.4237 is removed.

Sec. 21.4252  [Amended]

    48. In Sec. 21.4252, the authority citation for paragraph (b)(3) is 
amended by removing ``3473(a), 3523(a)'' and adding, in its place, 
``3523(a), 3680A(b)''; paragraph (c)(1) is amended by removing 
``training under Chapter 34.'' and adding, in its place, ``training; 
or''; paragraph (c)(2) is removed; paragraph (c)(3) is redesignated as

[[Page 26115]]

paragraph (c)(2); and the authority citation for paragraph (c) is 
amended by removing ``Sec. 2003, Pub. L. 97-35'' and adding, in its 
place, ``10 U.S.C. 16131(g); 38 U.S.C. 3034(d), 3241(b), 3523(b), 
3680A(b)''.
Sec. 21.4260  [Amended]
    49. In Sec. 21.4260, paragraph (c)(1)(i) is amended by removing 
``Secs. 21.1040 through 21.1045,'' and paragraph (c)(1)(ii) is amended 
by removing ``21.4230 or Sec. 21.5230'' and adding, in its place, 
``21.3021(h) or Sec. 21.5021(q)''.
Sec. 21.4264  [Amended]
    50. In Sec. 21.4264, paragraph (b) is amended by removing ``a 
veteran or'' and adding, in its place, ``an''; and paragraph (d)(1) 
introductory text is amended by removing ``veterans,''.
Sec. 21.4266  [Amended]

    51. In Sec. 21.4266, paragraph (c)(1)(iii) is amended by removing 
``21.4203, 21.4204 and 21.4205''; and adding, in its place, ``21.4203 
and 21.4204''.
Sec. 21.4276  [Removed]

    52. Section 21.4276 is removed.
Subpart E--[Removed]
    53. Subpart E is removed.
Subpart F--Education Loans
    54. The authority citation for subpart F is revised to read as 
follows:

    Authority: 38 U.S.C. 501, 3537, 3698, 3699, unless otherwise 
noted.

    55. In Sec. 21.4500, paragraph (b) is amended by removing ``Veteran 
or person'' and adding, in its place, ``spouse or surviving spouse'', 
and by removing ``section 3698, Title 38, U.S.C.'' and adding, in its 
place, ``38 U.S.C. 3512(f) and 3698.''; paragraph (d)(2) introductory 
text is amended by removing ``a veteran or eligible person'' and 
adding, in its place, ``an eligible spouse or surviving spouse''; the 
authority citation following paragraph (d)(2) introductory text is 
amended by removing ``3698'' and adding, in its place, ``3512(f), 
3698''; paragraph (d)(2)(ii) is amended by removing ``Vocational 
Rehabilitation and'' in each place it appears; the authority citation 
for paragraph (d) is amended by removing ``3698(c)'' and adding, in its 
place, ``3512(f), 3698(c)''; paragraph (e)(1) is amended by removing 
``the veteran or other eligible person'' and adding, in its place, 
``the eligible spouse or surviving spouse''; paragraph (e)(2) is 
amended by removing ``the veteran or other eligible person'' and 
adding, in its place, ``the eligible spouse or surviving spouse''; 
paragraph (e)(3) is amended by removing ``the veteran or other eligible 
person'' and adding, in its place, ``the eligible spouse or surviving 
spouse''; paragraph (e)(4) is amended by removing ``the veteran or 
other eligible person under section 3231, 3461, or subchapter II of 
Chapter 35, Title 38 U.S.C., which applies solely to the veteran or 
eligible person'' and adding, in its place, ``the eligible spouse or 
surviving spouse under 38 U.S.C. chapter 35''; paragraph (e)(5) is 
amended by removing ``veteran or other eligible person'' and adding, in 
its place, ``eligible spouse or surviving spouse''; paragraph (e)(6) is 
amended by removing ``veteran under section 3485, Title 38 U.S.C.'' and 
adding, in its place, ``eligible spouse or surviving spouse under 38 
U.S.C. 3537''; paragraph (g) is amended by removing ``a veteran or 
eligible person'' and adding, in its place, ``an eligible spouse or 
surviving spouse''; and by removing ``Effective January 1, 1975, the'' 
and adding, in its place, ``The''; the authority citation following 
paragraph (h) is amended by removing ``3698(b)'' and adding, in its 
place, ``3512(f), 3698(b)''; and paragraph (f) is revised to read as 
follows:
Sec. 21.4500  Definitions.

* * * * *
    (f) Actual cost of attendance. The term actual cost of attendance 
means:
    (1) The actual charge per student for tuition, fees, and books;
    (2) An allowance for commuting (this allowance will be based on 
22.5 cents per mile for distances not exceeding normal commuting 
distance);
    (3) An allowance for other expenses reasonably related to 
attendance at the institution at which the eligible spouse or surviving 
spouse is enrolled; and
    (4) A room and board allowance that shall be determined as follows:
    (i) If the educational institution actually provides the eligible 
spouse or surviving spouse with room and board, the allowance shall 
equal the actual charges to him or her for room and board;
    (ii) If the educational institution provides some students with 
room and board, but does not provide room and board for the eligible 
spouse or surviving spouse, the room and board allowance shall equal 
either the actual expenses incurred by the eligible spouse or surviving 
spouse for room and board, or the amount for room and board that the 
educational institution would have charged the eligible spouse or 
surviving spouse, had the educational institution provided him or her 
with room and board, whichever is less; and
    (iii) If the educational institution does not provide any students 
with room and board, the room and board allowance shall equal either 
the actual expenses incurred by the eligible spouse or surviving spouse 
for room and board or the amount the eligible spouse or surviving 
spouse would have been charged for room and board had he or she been 
provided room and board by the nearest State college or State 
university that provides room and board, whichever is less.
* * * * *
    56. Section 21.4501 is revised to read as follows:

Sec. 21.4501  Eligibility.

    (a) General. Any eligible spouse or surviving spouse shall be 
eligible to receive an education loan if he or she meets the criteria 
of this section.

(Authority: 38 U.S.C. 3512(f), 3698)

    (b) Eligibility criteria. To qualify for an education loan--
    (1) The eligible spouse's or surviving spouse's delimiting period 
as determined by Sec. 21.3046 (a), (b), or (d) must have expired;
    (2) The eligible spouse or surviving spouse must--
    (i) Have financial resources that may reasonably be expected to be 
expended for education needs and which are insufficient to meet the 
actual costs of attendance;
    (ii) Execute a promissory note payable to the Department of 
Veterans Affairs, as provided by Sec. 21.4504;
    (iii) Have unused entitlement provided under 38 U.S.C. 3511;
    (iv) During the term, quarter, or semester for which the loan is 
granted, be enrolled on a full-time basis in pursuit of the approved 
program of education in which he or she was enrolled on the date his or 
her eligibility expired under Sec. 21.3046 (a), (b), or (d); and
    (v) Have been enrolled in a program of education on a full-time 
basis--
    (A) On the date his or her period of eligibility expired under 
Sec. 21.3046 (a), (b), or (d); or
    (B) On the last date of the ordinary term, semester or quarter 
preceding the date his or her eligibility expired under Sec. 21.3046 
(a), (b), or (d), if the delimiting date fell during a school break or 
summer term.

(Authority: 38 U.S.C. 3512(f), 3698)

    (c) Limitations. The period for which a loan may be granted shall 
not extend beyond the earliest of the following dates:
    (1) Two years after the expiration of the period of eligibility as 
determined by Sec. 21.3046(a), (b), or (d);
    (2) The date on which the eligible spouse's or surviving spouse's 
entitlement is exhausted; or

[[Page 26116]]

    (3) The date on which the eligible spouse or surviving spouse 
completes the approved program of education which he or she was 
pursuing on the date the delimiting period determined by Sec. 21.3046 
(a), (b), or (d) expired.

(Authority: 38 U.S.C. 3512(f), 3698)

    (d) Exclusions. No eligible spouse or surviving spouse shall be 
authorized an education loan if he or she has defaulted on a previous 
education loan and there is a remaining unliquidated payment due VA.

(Authority: 38 U.S.C. 3512(f), 3698)

Sec. 21.4502   [Amended]

    57. In Sec. 21.4502, paragraph (a) is amended by removing ``veteran 
or other eligible person'' and adding, in its place, ``spouse or 
surviving spouse''; paragraph (b)(2) is amended by removing ``veteran 
or other eligible person'' and adding, in its place, ``eligible spouse 
or surviving spouse''; paragraph (b)(3) is amended by removing 
``veteran or other eligible person'' and adding, in its place, 
``eligible spouse or surviving spouse''; and paragraph (b)(4) is 
amended by removing ``veteran or other eligible person'' wherever it 
appears, and adding, in its place, ``eligible spouse or surviving 
spouse''.
    58. In Sec. 21.4503, paragraph (a)(1) is amended by removing 
``veteran or other eligible person'' and adding, in its place, 
``eligible spouse or surviving spouse''; paragraphs (b)(4), (b)(5), 
(b)(10), and (b)(11) are removed; paragraphs (b)(6), (b)(7), (b)(8), 
and (b)(9) are redesignated as paragraphs (b)(4), (b)(5), (b)(6), and 
(b)(7), respectively; the authority citation following newly 
redesignated paragraph (b)(4) is amended by removing ``3698(b)'' and 
adding, in its place, ``3512(f), 3698(b)''; newly redesignated 
paragraph (b)(5) is amended by removing ``veteran or other eligible 
person'' and adding, in its place, ``eligible spouse or surviving 
spouse''; newly redesignated paragraph (b)(7) is amended by removing 
``veteran or other eligible person'' and adding, in its place, ``spouse 
or surviving spouse''; and paragraph (b)(2) and newly redesignated 
paragraph (b)(6) are revised to read as follows:

Sec. 21.4503   Determination of loan amount.

* * * * *
    (b) Amount. * * *
    (2) The aggregate of the amounts any eligible spouse or surviving 
spouse may borrow for an education loan may not exceed $2,500 in any 
one academic year. It also may not exceed an amount determined by 
multiplying the number of months of educational assistance to which the 
eligible spouse or surviving spouse would be entitled were it not for 
the expiration of his or her delimiting period under 38 U.S.C. 3511 
times $376.

(Authority: 38 U.S.C. 3512(f), 3698)
* * * * *
    (6) An eligible spouse or surviving spouse may receive more than 
one loan covering separate loan periods, subject to paragraphs (b)(3) 
and (b)(7) of this section.
* * * * *
    59. In Sec. 21.4504, paragraph (d) is amended by removing ``veteran 
or other eligible person'' each place it appears, and adding, in its 
place, ``spouse or surviving spouse'' and by removing ``veteran's or 
eligible person's'' and adding, in its place, ``eligible spouse's or 
surviving spouse's''; paragraph (e) is amended by removing ``veteran or 
eligible person'' and adding, in its place, ``spouse or surviving 
spouse''; paragraph (f) is amended by removing ``veteran or eligible 
person'' each place it appears, and adding, in its place, ``spouse or 
surviving spouse''; paragraph (g) is amended by removing ``A veteran or 
eligible person'' and adding, in its place, ``An eligible spouse or 
surviving spouse''; and paragraph (a) introductory text and paragraph 
(a)(3)(ii) are revised to read as follows:

Sec. 21.4504   Promissory note.

    (a) General. The agreement by VA to loan money pursuant to 38 
U.S.C. 3512(f) and 3698 to any eligible spouse or surviving spouse 
shall be in the form of a promissory note which shall include:
* * * * *
    (3) * * *
    (ii) For loans of less than $600, 1 year and 7 months after such 
date for the first $50 of the loan plus 1 additional month for each 
additional $5 of the loan.
* * * * *

Sec. 21.4505   [Amended]

    60. In Sec. 21.4505, paragraph (a) is amended by removing ``veteran 
or eligible person'' each place it appears, and adding, in its place, 
``eligible spouse or surviving spouse''; paragraph (b)(1) is amended by 
removing ``veteran or eligible person'' and adding, in its place, 
``eligible spouse or surviving spouse''; paragraph (b)(2) introductory 
text is amended by removing ``veterans and other eligible persons'',and 
adding, in its place, ``spouses or surviving spouses''; and the 
authority citation following paragraph (b) is amended by removing 
``3698'' and adding, in its place, ``3512(f), 3698''.

Sec. 21.4507   [Amended]

    61. In Sec. 21.4507, paragraph (a) is amended by removing 
``persons'' and adding, in its place, ``spouses and surviving 
spouses''; paragraph (b) is amended by removing ``veterans and other 
eligible persons'' and adding, in its place, ``spouses and surviving 
spouses''; and the authority citation is amended by removing ``3696'' 
and adding, in its place, ``3512(f), 3696''.

Subpart F-2--[Removed]

    62. Subpart F-2 is removed.

Subpart K--All Volunteer Force Educational Assistance Program 
(Montgomery GI Bill--Active Duty)

    63. The authority citation for subpart K continues to read as 
follows:

    Authority: 38 U.S.C. 501(a), chs. 30, 36, unless otherwise 
noted.

    64. The heading for subpart K is revised to read as set forth 
above.
    65. In Sec. 21.7000, paragraph (b) is revised to read as follows:

Sec. 21.7000  Establishment of educational assistance program.

* * * * *
    (b) Purpose. The purpose of this program is as stated in 38 U.S.C. 
3001.

(Authority: 38 U.S.C. 3001)

    66. In Sec. 21.7044, the section heading and paragraphs (a)(1) and 
(b)(1) are revised to read as follows:

Sec. 21.7044   Persons with eligibility under 38 U.S.C. chapter 34.

* * * * *
    (a) Eligibility based solely on active duty. * * *
    (1) The individual must have met the requirements of 38 U.S.C. 
chapter 34, as in effect on December 31, 1989, establishing eligibility 
for educational assistance allowance under that chapter;
* * * * *
    (b) Eligibility based on combined active duty service and service 
in the Selected Reserve. * * *
    (1) The individual must have met the requirements of 38 U.S.C. 
chapter 34, as in effect on December 31, 1989, establishing eligibility 
for educational assistance allowance under that chapter;
* * * * *

Sec. 21.7135   [Amended]

    67. In Sec. 21.7135, paragraph (f)(3) is amended by removing 
``21.7140(b) of this part'' and adding, in its place, ``21.7140(d)''; 
paragraph (i) is amended by removing ``of this part'' wherever it 
appears; paragraphs (j)(1), (k)(1), (n), and (o) are amended by 
removing ``of this part''; paragraph (p) is amended by

[[Page 26117]]

removing ``of this part'' each place it appears; paragraph (r) is 
amended by removing ``of this part'' each place it appears; and 
paragraph (t) is amended by removing ``of this part''.

Sec. 21.7140   [Amended]

    68. In Sec. 21.7140, paragraph (c)(1)(i) is amended by removing 
``of this part''; paragraph (c)(2) introductory text is amended by 
removing ``after-'' and adding, in its place, ``after--''; paragraph 
(c)(2)(i) is amended by removing ``of this part''; paragraph (c)(2)(ii) 
is amended by removing ``worked'' and adding, in its place, 
``worked.''; paragraph (d)(1) is amended by removing ``of this part'' 
wherever it appears; paragraphs (d)(2)(i) and (d)(2)(ii) are amended by 
removing ``Vocational Rehabilitation and'' wherever it appears; and 
paragraph (e)(2) is amended by removing ``of this part''.
    69. Section 21.7141 is revised to read as follows:

Sec. 21.7141   Tutorial assistance.

    An individual who is otherwise eligible to receive benefits under 
the Montgomery GI Bill - Active Duty may receive supplemental monetary 
assistance to provide tutorial services. In determining whether VA will 
pay the individual this assistance, VA will apply the provisions of 
Sec. 21.4236.

(Authority: 38 U.S.C. 3019, 3492)

Sec. 21.7145   [Removed]

    70. Section 21.7145 is removed.

Sec. 21.7154   [Amended]

    71. In Sec. 21.7154, paragraph (b) is removed, and paragraph (c) is 
redesignated as paragraph (b).

Sec. 21.7158   [Amended]

    72. In Sec. 21.7158, paragraph (b)(1) is amended by removing 
``21.744(b)'' and adding, in its place, ``21.7144(b)''.

[FR Doc. 96-12548 Filed 5-23-96; 8:45 am]
BILLING CODE 8320-01-P

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.