Federal Register final rules — 1996-06-20

issue-1996-06-20Federal Register final rules — 1996-06-20Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-15766 Groundfish of the Bering Sea and Aleutian Islands Area; Yellowfin Sole by Vessels Using Trawl Gear
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31463]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15766]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 675

[Docket No. 960129019-6019-01; I.D. 061496C]

Groundfish of the Bering Sea and Aleutian Islands Area; Yellowfin 
Sole by Vessels Using Trawl Gear

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is closing the directed fishery for yellowfin sole by 
vessels using trawl gear in the Bering Sea and Aleutian Islands 
management area (BSAI). This action is necessary to prevent exceeding 
the third seasonal bycatch allowance of Pacific halibut apportioned to 
the trawl yellowfin sole fishery in the BSAI.

EFFECTIVE DATE: 12 noon, Alaska local time (A.l.t.), June 17, 1996, 
until 12 noon, A.l.t., August 15, 1996.

FOR FURTHER INFORMATION CONTACT: Andrew N. Smoker, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the BSAI exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for the Groundfish Fishery of the Bering Sea and Aleutian Islands 
Area (FMP) prepared by the North Pacific Fishery Management Council 
under authority of the Magnuson Fishery Conservation and Management 
Act. Fishing by U.S. vessels is governed by regulations implementing 
the FMP at 50 CFR parts 620 and 675.
    The third seasonal bycatch allowance of Pacific halibut for the 
BSAI trawl yellowfin sole fishery, which is defined at 
Sec. 675.21(b)(1)(iii)(B)(1), was established by the Final 1996 Harvest 
Specifications of Groundfish (61 FR 4311, February 5, 1996) as 100 
metric tons.
    The Director, Alaska Region, NMFS, has determined, in accordance 
with Sec. 675.21(c)(1)(iii), that the third seasonal bycatch allowance 
of Pacific halibut apportioned to the trawl yellowfin sole fishery in 
the BSAI has been caught. Therefore, NMFS is prohibiting directed 
fishing for yellowfin sole by vessels using trawl gear in the BSAI.
    Maximum retainable bycatch amounts for applicable gear types may be 
found in the regulations at Sec. 675.20(h).

Classification

    This action is taken under 50 CFR 675.21 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: June 17, 1996.
Richard H. Schaefer,
Director, Office of Fisheries Conservation and Management, National 
Marine Fisheries Service.
[FR Doc. 96-15766 Filed 6-17-96; 2:58 pm]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-15760 Promoting Wholesale Competition Through Open Access Non- discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15760]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Parts 35 and 385

[Docket Nos. RM95-8-002 and RM94-7-003]

Promoting Wholesale Competition Through Open Access Non-
discriminatory Transmission Services by Public Utilities; Recovery of 
Stranded Costs by Public Utilities and Transmitting Utilities

Issued: June 14, 1996.
AGENCY: Federal; Energy Regulatory Commission.

ACTION: Final rule; notice of filing of motion for extension of time.

-----------------------------------------------------------------------

SUMMARY: On June 12, 1996, the American Public Power Association, the 
Electricity Consumers Resource Council, the National Rural Electric 
Cooperative Association and the Ohio Consumers' Counsel (Joint Movants) 
filed a joint request to extend the comment period for compliance 
filings made under this final rule (Order No. 888, 61 FR 21540, May 10, 
1996) from the 15-day comment period established in the final rule to a 
45-day comment period. Joint Movants also asked that the Commission 
require that the compliance tariff filings, as well as redline versions 
of those filings, be made in electronic format and posted on the FERC 
Bulletin Board. Copies of the motion are on file with the Commission 
and are available for public inspection.

DATES: Any person desiring to respond to the motion should file an 
answer on or before June 21, 1996.

ADDRESSES: Send answers to: Office of the Secretary, Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT: David D. Withnell, Federal Energy 
Regulatory Commission, Office of the General Counsel, 888 First St., 
NE., Washington, DC 20426, Telephone: (202) 208-2063.
Lois D. Cashell,
Secretary.
[FR Doc. 96-15760 Filed 6-19-96; 8:45 am]
BILLING CODE 6717-01-M

Complete official Federal Register PDF

FR Doc. 96-15759 Screening at Privately Owned Bird Quarantine Facilities
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31391-31392]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15759]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Animal and Plant Health Inspection Service

9 CFR Part 92

[Docket No. 94-132-2]

Screening at Privately Owned Bird Quarantine Facilities

AGENCY: Animal and Plant Health Inspection Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are amending the regulations that apply to privately owned 
quarantine facilities for imported birds to provide for the use of 
nylon screening and to clarify the meaning of ``double screened.'' 
These amendments will give facility operators a choice of screening 
materials and clarify the regulations.

EFFECTIVE DATE: July 22, 1996.

FOR FURTHER INFORMATION CONTACT: Dr. Tracye R. Butler, Staff 
Veterinarian, Import/Export Animals, National Center for Import and 
Export, VS, APHIS, 4700 River Road Unit 39, Riverdale, MD 20737-1231, 
(301) 734-5097.

SUPPLEMENTARY INFORMATION:

Background

    The regulations in 9 CFR part 92.100 through 92.107, ``Subpart 
ABirds'' (referred to below as ``the regulations''), govern the 
importation of certain birds to prevent the introduction of 
communicable diseases of livestock and poultry. As a condition of 
importation, all imported birds must be quarantined for a minimum of 30 
days upon their arrival in the United States. Under 
Sec. 92.101(c)(2)(ii), certain personal pet birds may remain in the 
owner's possession during the 30-day quarantine if kept separate from 
other birds. In all other cases, imported birds must be quarantined in 
either a U.S. Department of Agriculture quarantine facility or in a 
privately owned quarantine facility that meets standards set forth in 
Sec. 92.106(c).
    The standards for privately owned quarantine facilities for 
imported birds include installation of screening over all openings to 
the outside to prevent the entry of rodents and insects, which could 
transmit disease. The regulations require that all screening be metal 
and that all openings to the outside be double-screened (see 
Sec. 92.106(c)(2)(ii)(A)).
    On March 12, 1996, we published in the Federal Register (61 FR 
9957-9958, Docket No. 94-132-1) a proposal to amend the regulations by 
providing for the use of nylon screening and by clarifying the meaning 
of the term ``double screened.''

[[Page 31392]]

    We solicited comments concerning our proposal for 60 days ending 
May 13, 1996. We did not receive any comments. The facts presented in 
the proposed rule still provide the basis for this final rule.
    Therefore, based on the rationale set forth in the proposed rule, 
we are adopting the provisions of the proposal as a final rule without 
change.

Executive Order 12866 and Regulatory Flexibility Act

    This rule has been reviewed under Executive Order 12866. The rule 
has been determined to be not significant for the purposes of Executive 
Order 12866 and, therefore, has not been reviewed by the Office of 
Management and Budget.
    Our economic analysis indicates that the amendments will have 
little economic impact on privately owned bird quarantine facilities. 
Metal and nylon mesh are comparably priced. In addition, the rule adds 
nylon mesh as a screening option; it does not require quarantine 
facilities to be re-screened. We anticipate that the clarification 
concerning double screening will have no effect on facilities.
    Under these circumstances, the Administrator of the Animal and 
Plant Health Inspection Service has determined that this action will 
not have a significant economic impact on a substantial number of small 
entities.

Executive Order 12372

    This program/activity is listed in the Catalog of Federal Domestic 
Assistance under No. 10.025 and is subject to Executive Order 12372, 
which requires intergovernmental consultation with State and local 
officials. (See 7 CFR part 3015, subpart V.)

Executive Order 12778

    This rule has been reviewed under Executive Order 12778, Civil 
Justice Reform. This rule: (1) Preempts all State and local laws and 
regulations that are inconsistent with this rule; (2) has no 
retroactive effect; and (3) does not require administrative proceedings 
before parties may file suit in court challenging this rule.

Paperwork Reduction Act

    This rule contains no information collection or recordkeeping 
requirements under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 
et seq.).

List of Subjects in 9 CFR Part 92

    Animal diseases, Imports, Livestock, Poultry and poultry products, 
Quarantine, Reporting and recordkeeping requirements.

    Accordingly, 9 CFR part 92 is amended as follows:

PART 92--IMPORTATION OF CERTAIN ANIMALS AND POULTRY AND CERTAIN 
ANIMAL AND POULTRY PRODUCTS; INSPECTION AND OTHER REQUIREMENTS FOR 
CERTAIN MEANS OF CONVEYANCE AND SHIPPING CONTAINERS THEREON

    1. The authority citation for part 92 continues to read as follows:

    Authority: 7 U.S.C. 1662; 19 U.S.C. 1306; 21 U.S.C. 102-105, 
111, 114a, 134a, 134b, 134c, 134d, 134f, 135, 136, and 136a; 31 
U.S.C. 9701; 7 CFR 2.22, 2.80, and 371.2(d).

    2. In Sec. 92.106, paragraphs (c)(2)(ii)(A) and (c)(2)(ii)(P)(1) 
are revised to read as follows:

Sec. 92.106 Quarantine requirements.

* * * * *
    (c) * * *
    (2) * * *
    (ii) * * *
    (A) Be constructed only with material that can withstand continued 
cleaning and disinfection. All solid walls, floors, and ceilings must 
be constructed of impervious material. All openings to the outside must 
be double-screened, with an interior screen of metal or nylon mesh that 
is impervious to biting insects such as gnats or mosquitos, and an 
exterior metal screen that is rodent-proof and is made of wire, such as 
rabbit wire, hardware cloth, or smooth welded wire, with mesh size no 
larger than 1 inch x 1.5 inches (2.54 cm x 3.81 cm). The interior and 
exterior screens must be separated by at least 3 inches (7.62 cm);
* * * * *
    (P) * * *
    (1) Any of the exterior walls may be replaced by a double-screened 
wall set in a concrete or concrete-block curb. The double screening 
shall be of wire mesh or wire mesh and nylon mesh, as provided in 
paragraph (c)(2)(ii)(A) of this section, with the interior and exterior 
screens of the sun room wall separated by at least 3 inches (7.62 cm); 
the concrete or concrete block curb must be at least 12 inches high, 
impermeable to water, and able to prevent the escape of water, manure, 
and debris.
* * * * *
    Done in Washington, DC, this 14th day of June 1996.
Lonnie J. King,
Administrator, Animal and Plant Health Inspection Service.
[FR Doc. 96-15759 Filed 6-19-96; 8:45 am]
BILLING CODE 3410-34-P

Complete official Federal Register PDF

FR Doc. 96-15750 Replacement of CF 7506 by CF 7501
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31394-31395]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15750]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Customs Service

19 CFR PART 10

[T.D. 96-51]

Replacement of CF 7506 by CF 7501

AGENCY: U.S. Customs Service, Department of the Treasury.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document amends the Customs Regulations to replace a 
reference to Customs Form (CF) 7506 in Sec. 10.62(c)(2), Customs 
Regulations, with a reference to CF 7501. This change was inadvertently 
omitted from a final rule document published in the Federal Register on 
October 6, 1995 (60 FR 52294) which replaced all other references to CF 
7506 in the Customs Regulations with references to CF 7501.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Raymond Janiszewski, Office of Trade 
Compliance, (202)927-0380.

SUPPLEMENTARY INFORMATION:

Background

    Previously, CF 7506, Warehouse Withdrawal Conditionally Free of 
Duty and Permit, was the form used to make warehouse withdrawals for 
merchandise conditionally free of duty. The CF 7506 has now been 
eliminated, and the CF 7501 is to be used instead.
    In a final rule document published in the Federal Register (60 FR 
52294) on October 6, 1995, references to CF 7506 were deleted and 
replaced by reference to CF 7501. Inadvertently, the reference to CF 
7506 in Sec. 10.62(c)(2), Customs Regulations (19 CFR 10.62 (c)(2)), 
was not deleted in that document and replaced with a reference to CF 
7501. This document corrects that omission.

Regulatory Flexibility Act, Executive Order 12866, Inapplicability of 
Public Notice and Comment Requirements, and Delayed Effective Date 
Requirements

    Inasmuch as this amendment merely substitutes one Customs Form for 
another, pursuant to 5 U.S.C. 553 (a)(2) and (b)(B), good cause exists 
for

[[Page 31395]]

dispensing with notice and public procedure thereon as unnecessary. For 
the same reason, good cause exists for dispensing with the requirement 
for a delayed effective date, under 5 U.S.C. 553 (a)(2) and (d)(3). 
Also, for the same reason, it is certified that the amendments will not 
have a significant economic impact on a substantial number of small 
entities. Accordingly, the amendments are not subject to the regulatory 
analysis or other requirements of 5 U.S.C. 603 or 604.
    This document does not meet the criteria for a ``significant 
regulatory action'' as specified in Executive Order 12866.

Drafting Information

    The principal author of this document was Janet L. Johnson, 
Regulations Branch. However, personnel from other offices participated 
in its development.

List of Subjects in 19 CFR Part 10

    Caribbean Basin initiative, Customs duties and inspection, Exports, 
Reporting and recordkeeping requirements.

Amendment to the Regulations

    For the reasons set forth in the preamble, Part 10 of the Customs 
Regulations (19 CFR Part 10) is amended as set forth below.

PART 10--ARTICLES CONDITIONALLY FREE, SUBJECT TO A REDUCED RATE, 
ETC.

    1. The general authority citation for Part 10 continues to read as 
follows:

    Authority: 19 U.S.C. 66, 1202 (General Note 20, Harmonized 
Tariff Schedule of the United States), 1321, 1481, 1498, 1508, 1623, 
3314;
* * * * *

Sec. 10.62  [Amended]

    2. Section 10.62(c)(2) is amended by removing the reference 
``Customs Form 7506'' and by adding ``Customs Form 7501'' in its place.
George J. Weise,
Commissioner of Customs.
    Approved: May 30, 1996.
John P. Simpson,
Deputy Assistant Secretary of the Treasury.
[FR Doc. 96-15750 Filed 6-19-96; 8:45 am]
BILLING CODE 4820-02-P

Complete official Federal Register PDF

FR Doc. 96-15738 Addition of Ohio River Islands National Wildlife Refuge to the List of Open Areas for Sport Fishing in West Virginia, Pennsylvania, and Kentucky
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31459-31461]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15738]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 32

RIN 1018-AD43

Addition of Ohio River Islands National Wildlife Refuge to the 
List of Open Areas for Sport Fishing in West Virginia, Pennsylvania, 
and Kentucky

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The U.S. Fish and Wildlife Service (Service) adds Ohio River 
Islands National Wildlife Refuge to the list of areas open for sport 
fishing in West Virginia, Pennsylvania, and Kentucky, along with 
pertinent refuge-specific regulations for such activities. The Service 
has determined that such use will be compatible with the purposes for 
which the refuge was established. The Service has further determined 
that this action is in accordance with the provisions of all applicable 
laws, is consistent with principles of sound fish and wildlife 
management, helps implement Executive Order 12962, (Recreational 
Fisheries), and is otherwise in the public interest by providing 
additional recreational opportunities at a national wildlife refuge.

EFFECTIVE DATE: This rule is effective July 22, 1996.

ADDRESSES: Assistant Director--Refuges and Wildlife, U.S. Fish and 
Wildlife Service, 1849 C Street, NW., MS 670 ARLSQ, Washington, DC 
20240.

FOR FURTHER INFORMATION CONTACT: Stephen R. Vehrs, Division of Refuges, 
U.S. Fish and Wildlife Service, Washington, DC 20240; Telephone (703) 
358-2397.

SUPPLEMENTARY INFORMATION: National wildlife refuges generally are 
closed to hunting and sport fishing until opened by rulemaking. The 
Secretary of the Interior (Secretary) may open refuge areas to hunting 
and/or fishing upon a determination that such uses are compatible with 
the purpose(s) for which the refuge was established. The action also 
must be in accordance with provisions of all laws applicable to the 
areas, must be consistent with the principles of sound fish and 
wildlife management, and must otherwise be in the public interest. This 
rulemaking opens Ohio River Islands National Wildlife Refuge to sport 
fishing.
    In the November 29, 1995, issue of the Federal Register (60 FR 
61239-61240) the Service published a proposed rulemaking and invited 
public comment. A description of the refuge and the proposed fishing 
program was provided. No comments were received during the 60-day 
public comment period.

Statutory Authority

    The National Wildlife Refuge System Administration Act (NWRSAA) of 
1966, as amended (16 U.S.C. 668dd), and the Refuge Recreation Act of 
1962 (16 U.S.C. 460k) govern the administration and public use of 
national wildlife refuges. Specifically, Section 4(d)(1)(A) of the 
NWRSAA authorizes the Secretary of the Interior to permit the use of 
any area within the Refuge System for any purpose, including but not 
limited to, hunting, fishing and public recreation, accommodations and 
access, when he determines that such uses are compatible with the major 
purpose(s) for which the area was established.
    The Refuge Recreation Act (RRA) authorizes the Secretary to 
administer areas within the Refuge System for public recreation as an 
appropriate incidental or secondary use only to the extent that it is 
practicable and not inconsistent with the primary purpose(s) for which 
the areas were established. The NWRSAA and the RRA also authorize the 
Secretary to issue regulations to carry out the purposes of the Acts 
and regulate uses.
    In many cases, refuge-specific regulations are developed to ensure 
the compatibility of the programs with the purposes for which the 
refuge was established. Initial compliance with the NWRSAA and the RRA 
has been ensured for hunting and sport fishing on newly acquired 
refuges through an interim determination of compatibility made at the 
time of acquisition. This has ensured that the determinations required 
by these acts have been made prior to the addition of refuges to the 
lists of areas open to hunting and fishing in 50 CFR part 32. Continued 
compliance is ensured by the development of long-term hunting and sport 
fishing plans and by annual review of hunting and sport fishing 
programs and regulations.
    The Service has determined that this action is in accordance with 
the provisions of all applicable laws, is

[[Page 31460]]

consistent with principles of sound fish and wildlife management, helps 
implement Executive Order 12962 (Recreational Fisheries), and is 
otherwise in the public interest by providing additional recreational 
opportunities at national wildlife refuges. Sufficient funds will be 
available within the refuge budget to operate the hunting and sport 
fishing programs as proposed.

Ohio River Islands National Wildlife Refuge

    Established in 1990, the Ohio River Islands National Wildlife 
Refuge is located on the Ohio River from Shippingport, Pennsylvania to 
Manchester, Ohio. There are currently eighteen islands in the refuge 
totaling 1,020 acres. Through ongoing acquisition efforts, the refuge 
has the potential to include all, or a portion of, 38 islands located 
along 362 river miles encompassing up to 3,500 acres of wildlife 
habitat.
    The Ohio River islands and their back channels are recognized for 
high quality fish and wildlife, recreation, scientific, and natural 
heritage values. These areas provide some of the regions' highest 
quality riverine, wetland, and bottomland habitats, and are used by 
waterfowl, shorebirds, songbirds, warmwater fish, and freshwater 
mussels.
    The Ohio River Islands National Wildlife Refuge was established 
under the authority of the Fish and Wildlife Act of 1956 (16 U.S.C. 
742a-742j). The refuge's primary purposes are: ``* * * for the 
development, advancement, management, conservation and protection of 
fish and wildlife resources'', and ``for the benefit of the United 
States Fish and Wildlife Service, in performing its activities and 
services.'' The objectives of the sport fishing program are to:
    (1) Provide for the wise use of renewable natural resources;
    (2) provide an opportunity for sport fishing and minimal; 
interference from other anglers and freedom to participate in a natural 
setting; and
    (3) provide sport fishing opportunity when such use was not 
detrimental to the refuge's primary objective and is compatible with 
other wildlife-dependent recreation.
    A total of 55 species of fish were collected by the West Virginia 
Department of Natural Resources and the Service in the vicinity of the 
islands. The shallow water areas against the islands, particularly the 
back channels, are important nursery areas for a variety of game fish. 
Opening the refuge to sport fishing will have a negligible impact on 
the fishery resource.
    The 18 refuge islands comprise 1,020 acres, and State surveys of 
recreational fishing indicate little impact has been realized on the 
island habitats. The overwhelming majority of fish harvest occurs at 
dam tailwaters and main channel borders.
    Opening the refuge to fishing is compatible with refuge purposes. 
The fishing program will be reviewed, as appropriate, to ensure that 
sensitive habitats are protected from disturbance. Sufficient funds 
will be available within the refuge budget to operate this fishing 
program.

Paperwork Reduction Act

    The Service has examined this regulation under the Paperwork 
Reduction Act of 1995 and found it to contain no information collection 
requirements.

Economic Effect

    Service review has revealed that this rulemaking will increase 
fishermen visitation to the surrounding area of the refuge before, 
during or after recreational uses, compared to the refuge being closed 
to these recreational uses. When the Service acquired this land, all 
public use ceased under law until opened to the public in accordance 
with this rulemaking.
    This refuge is located away from large metropolitan areas. 
Businesses in the area consist primarily of small family owned stores, 
restaurants, gas stations and other small commercial enterprises. In 
addition, there are several small commercial and recreational fishing 
and hunting camps and marinas in the general area. This rule would have 
a positive effect on such entities; however, the amount of revenue 
generated is not large.
    Many area residents enjoy a rural lifestyle that includes frequent 
recreational use of the abundant natural resources of the area. A high 
percentage of the households enjoy hunting, fishing, and boating in 
area wetlands, rivers and lakes. Refuge lands were not generally 
available for general public use prior to government acquisition; 
however, they were fished and hunted upon by friends and relatives of 
the landowners, and some were under commercial hunting and fishing 
leases. Many nearby residents also participate in other forms of 
nonconsumptive outdoor recreation, such as biking, hiking, camping, 
birdwatching, canoeing, and other outdoor sports.
    Economic impacts of refuge hunting and fishing programs on local 
communities are calculated from average expenditures in the ``1995 
National Survey of Fishing, Hunting, and Wildlife-Associated 
Recreation''. In 1995, 42 million U.S. residents 16 years old and older 
hunted and/or fished. More specifically, 37 million fished and 14.5 
million hunted. Those who both fished and hunted account for the 9.5 
million overage. Nationwide expenditures by sportsmen totaled $42 
billion. Trip-related expenditures for food, lodging, and 
transportation were $16 billion or 37 percent of all fishing and 
hunting expenditures; equipment expenditures amounted to $19 billion, 
or 46 percent of the total; other expenditures such as those for 
magazines, membership dues, contributions, land leasing, ownership, 
licenses, stamps, tags, and permits accounted for $6.9 billion, or 16 
percent of all expenditures. Overall, anglers spent an average of $41 
per day. For each day of hunting, big game hunters averaged spending 
$40, small game hunters $20, and migratory bird hunters $33. Applying 
these national averages to projected visitation at Ohio River Islands 
NWR results in the following: 1200 fisherman are expected to spend 
$12,200 annually in pursuit of their sport.
    This rulemaking was not subject to review by the Office of 
Management and Budget under Executive Order 12866. A review under the 
Regulatory Flexibility Act of 1980 (5 U.S.C. 601 et seq.) has revealed 
that this rulemaking would not have a significant effect on a 
substantial number of small entities, which include businesses, 
organizations, or governmental jurisdictions. Hunters and/or fishermen 
increase visitation and expenditures in the surrounding area of the 
refuge and contribute in a positive manner, but the total amounts are 
not significant to the local area, therefore, this rule would have 
minimal effect on such entities.

Federalism

    This rule will not have substantial direct effects on the States, 
in their relationship between the Federal Government and the States, or 
on the distribution of power and responsibilities among the various 
levels of government. Therefore, in accordance with Executive Order 
12612, the Service has determined that this rule does not have 
sufficient Federalism implications to warrant the preparation of a 
Federalism Assessment.

Unfunded Mandates

    The Service has determined and certifies pursuant to the Unfunded 
Mandates Act, 2 U.S.C. 1502 et seq., that this rulemaking will not 
impose a cost

[[Page 31461]]

of $100 million or more in any given year on local or State governments 
or private entities.

Civil Justice Reform

    The Service has determined that these final regulations meet the 
applicable standards provided in Sections (a) and (b) of Executive 
Order 12988.

Environmental Effects

    Pursuant to the requirements of section 102(2)(C) of the National 
Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), an 
environmental assessment was prepared for this opening. Based upon the 
Environmental Assessment, the Service issued a Finding of No 
Significant Impact with respect to the opening. A Section 7 evaluation 
pursuant to the Endangered Species Act was conducted. The Service 
determined that this action will not affect any Federally listed or 
proposed for listing threatened or endangered species or their critical 
habitats. These documents are on file at the offices of the Service and 
may be reviewed by making preliminary arrangements with the primary 
author noted below.
    Primary Author: Stephen R. Vehrs, Division of Wildlife Refuges, 
U.S. Fish and Wildlife Service, Washington, DC, is the primary 
author of this rulemaking document.

List of Subjects in 50 CFR Part 32

    Fishing, Hunting, Reporting and recordkeeping requirements, 
Wildlife, Wildlife refuges.

    Accordingly, part 32 of chapter I of Title 50 of the Code of 
Federal Regulations is amended as follows:

PART 32--[AMENDED]

    1. The authority citation for Part 32 continues to read as follows:

    Authority: 5 U.S.C. 301; 16 U.S.C. 460k, 664, 668dd, and 715i.

Sec. 32.7  [Amended]

    2. Section 32.7, List of refuge units open to hunting and/or 
fishing, is amended by alphabetical adding ``Ohio River Islands 
National Wildlife Refuge'' to the States of Kentucky and Pennsylvania.
    3. Section 32.36 Kentucky is amended by adding ``Ohio River Islands 
National Wildlife Refuge'' in alphabetical order to read as follows:

Sec. 32.36  Kentucky.

* * * * *

Ohio River Islands National Wildlife Refuge

    A. Hunting of Migratory Game Birds. [Reserved]
    B. Upland Game Hunting. [Reserved]
    C. Big Game Hunting. [Reserved]
    D. Sport Fishing. Sport fishing is permitted on designated areas of 
the refuge under Kentucky's State fishing regulations and guidelines, 
unless otherwise posted on the refuge.
* * * * *
    4. Section 32.57, Pennsylvania is amended by adding ``Ohio River 
Islands National Wildlife'' alphabetically to read as follows:

Sec. 32.57  Pennsylvania.

* * * * *

Ohio River Islands National Wildlife Refuge

    A. Hunting of Migratory Game Birds. [Reserved]
    B. Upland Game Hunting. [Reserved]
    C. Big Game Hunting. [Reserved]
    D. Sport Fishing. Sport fishing is permitted on designated areas of 
the refuge under Pennsylvania's State fishing regulations and 
guidelines, unless otherwise posted on the refuge.
* * * * *
    5. Section 32.68, West Virginia is amended by revising paragraph D, 
under ``Ohio River Islands National Wildlife Refuge'' to read as 
follows:

Sec. 32.68  West Virginia.

* * * * *

Ohio River Islands National Wildlife Refuge

* * * * *
    D. Sport fishing. Sport fishing is permitted on designated areas of 
the refuge under West Virginia's State regulations and guidelines, 
unless otherwise posted on the refuge.
* * * * *
    Dated: April 16, 1996.
George T. Frampton, Jr.,
Assistant Secretary for Fish and Wildlife and Parks.
[FR Doc. 96-15738 Filed 6-19-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

FR Doc. 96-15737 Addition of Great Bay National Wildlife Refuge to the List of Open Areas for Hunting in New Hampshire
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31461-31463]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15737]

-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR
50 CFR Part 32

RIN 1018-AD44

Addition of Great Bay National Wildlife Refuge to the List of 
Open Areas for Hunting in New Hampshire

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The U.S. Fish and Wildlife Service (Service) adds Great Bay 
National Wildlife Refuge to the list of areas open for hunting in New 
Hampshire along with pertinent refuge-specific regulations for such 
activities. The Service has determined that such use will be compatible 
with the purposes for which the refuge was established. The Service has 
further determined that this action is in accordance with the 
provisions of all applicable laws, is consistent with principles of 
sound wildlife management, and is otherwise in the public interest by 
providing additional recreational opportunities at a national wildlife 
refuge.

EFFECTIVE DATE: This rule is effective July 22, 1996.

ADDRESSES: Assistant Director--Refuges and Wildlife, U.S. Fish and 
Wildlife Service, 1849 C Street, NW, MS 670 ARLSQ, Washington, DC 
20240.

FOR FURTHER INFORMATION CONTACT: Stephen R. Vehrs, at the address 
above; Telephone (703) 358-2397.

SUPPLEMENTARY INFORMATION: National wildlife refuges generally are 
closed to hunting until opened by rulemaking. The Secretary of the 
Interior (Secretary) may open refuge areas to hunting upon a 
determination that such uses are compatible with the purpose(s) for 
which the refuge was established. The action also must be in accordance 
with provisions of all laws applicable to the areas, must be consistent 
with the principles of sound wildlife management, and otherwise must be 
in the public interest. The Service opens Great Bay National Wildlife 
Refuge to hunting migratory birds, and big game.
    In the November 29, 1995, issue of the Federal Register (60 FR 
61237-61239) the Service published a proposed rulemaking and invited 
public comment. A description of the refuge and the proposed hunting 
program was provided. No comments were received during the 60-day 
public comment period.

Statutory Authority

    The National Wildlife Refuge System Administration Act (NWRSAA) of 
1966, as amended (16 U.S.C. 668dd), and the Refuge Recreation Act of 
1962 (16 U.S.C. 460k) govern the administration and public use of 
national wildlife refuges. Specifically, Section 4(d)(1)(A) of the 
NWRSAA authorizes the Secretary of the Interior to permit the use of 
any area within the Refuge System for any purpose, including but not 
limited to, hunting, fishing and public recreation, accommodations and 
access, when he determines that such uses are compatible with the major 
purpose(s) for which the area was established.
    The Refuge Recreation Act (RRA) authorizes the Secretary to 
administer areas within the Refuge System for

[[Page 31462]]

public recreation as an appropriate incidental or secondary use only to 
the extent that it is practicable and not inconsistent with the primary 
purpose(s) for which the areas were established. The NWRSAA and the RRA 
also authorize the Secretary to issue regulations to carry out the 
purposes of the Acts and regulate uses.
    In many cases, refuge-specific regulations are developed to ensure 
the compatibility of the programs with the purposes for which the 
refuge was established. Initial compliance with the NWRSAA and the RRA 
has been ensured for hunting and sport fishing on newly acquired 
refuges through an interim determination of compatibility made at the 
time of acquisition. This has ensured that the determinations required 
by these acts have been made prior to the addition of refuges to the 
lists of areas open to hunting and fishing in 50 CFR part 32. Continued 
compliance is ensured by the development of long-term hunting and sport 
fishing plans and by annual review of hunting and sport fishing 
programs and regulations.
    The Service has determined that this action is in accordance with 
the provisions of all applicable laws, is consistent with principles of 
sound wildlife management and is otherwise in the public interest by 
providing additional recreational opportunities at national wildlife 
refuges. Sufficient funds will be available within the refuge budget to 
operate the hunting programs as proposed.

Paperwork Reduction Act

    The Service has examined this regulation under the Paperwork 
Reduction Act of 1995 and has found it to contain no information 
collection requirements.

Economic Effect

    Service review has revealed that this rulemaking will increase 
hunter visitation to the surrounding area of the refuge before, during 
or after recreational uses, compared to the refuge being closed to 
these recreational uses. When the Service acquired this land, all 
public use ceased under law until opened to the public in accordance 
with this rulemaking.
    This refuge is located away from large metropolitan areas. 
Businesses in the area consist primarily of small family owned stores, 
restaurants, gas stations and other small commercial enterprises. In 
addition, there are several small commercial and recreational hunting 
camps and marinas in the general area. This final rule would have a 
positive effect on such entities; however, the amount of revenue 
generated is not large.
    Many area residents enjoy a rural lifestyle that includes frequent 
recreational use of the abundant natural resources of the area. A high 
percentage of the households enjoy hunting, fishing, and boating in 
area wetlands, rivers and lakes. Refuge lands were not generally 
available for general public use prior to government acquisition; 
however, they were fished and hunted upon by friends and relatives of 
the landowners , and some were under commercial hunting and fishing 
leases. Many nearby residents also participate in other forms of 
nonconsumptive outdoor recreation, such as biking, hiking, camping, 
birdwatching, canoeing, and other outdoor sports.
    Economic impacts of refuge fishing and hunting programs on local 
communities are calculated from average expenditures in the ``1995 
National Survey of Fishing, Hunting, and Wildlife-Associated 
Recreation''. In 1995, 42 million U.S. residents 16 years old and older 
hunted and/or fished. More specifically, 37 million fished and 14.5 
million hunted. Those who both fished and hunted account for the 9.5 
million overage. Nationwide expenditures by sportsmen totaled $42 
billion. Trip-related expenditures for food, lodging, and 
transportation were $16 billion or 37 percent of all fishing and 
hunting expenditures; equipment expenditures amounted to $19 billion, 
or 46 percent of the total; other expenditures such as those for 
magazines, membership dues, contributions, land leasing, ownership, 
licenses, stamps, tags, and permits accounted for $6.9 billion, or 16 
percent of all expenditures. Overall, anglers spent an average of $41 
per day. For each day of hunting, big game hunters averaged spending 
$40, small game hunters $20, and migratory bird hunters $33. Applying 
these national averages to projected visitation at Great Bay National 
Wildlife Refuge, 500 hunters are expected to spend $20,000 annually in 
pursuit of their sport.
    This rulemaking was not subject to review by the Office of 
Management and Budget under Executive Order 12866. A review under the 
Regulatory Flexibility Act of 1980 (5 U.S.C. 601 et seq.) has revealed 
that this rulemaking would not have a significant effect on a 
substantial number of small entities, which include businesses, 
organizations, or governmental jurisdictions. Hunters and or fishermen 
increase visitation and expenditures in the surrounding area of the 
refuge and contribute in a positive manner, but the total amounts are 
not significant to the local area, therefore, this rule would have 
minimal effect on such entities.

Federalism

    This rule will not have substantial direct effects on the States, 
in their relationship between the Federal Government and the States, or 
on the distribution of power and responsibilities among the various 
levels of government. Therefore, in accordance with Executive Order 
12612, the Service has determined that this rule does not have 
sufficient Federalism implications to warrant the preparation of a 
Federalism Assessment.

Unfunded Mandates

    The Service has determined and certifies pursuant to the Unfunded 
Mandates Act, 2 U.S.C. 1502 et seq., that this rulemaking will not 
impose a cost of $100 million or more in any given year on local or 
State governments or private entities.

Civil Justice Reform

    The Service has determined that these final regulations meet the 
applicable standards provided in Sections (a) and (b) of Executive 
Order 12988.

Environmental Considerations

    Pursuant to the requirements of section 102(2)(C) of the National 
Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), an 
environmental assessment was prepared for this opening. Based upon the 
Environmental Assessment, the Service issued a Finding of No 
Significant Impact with respect to the opening. A Section 7 evaluation 
pursuant to the Endangered Species Act was conducted. The Service 
determined that the final action will not affect any Federally listed 
or proposed for listing threatened or endangered species or their 
critical habitats. These documents are on file at the offices of the 
Service and may be reviewed by contacting the primary author.

Primary Author

    Stephen R. Vehrs, Division of Refuges, U.S. Fish and Wildlife 
Service, Washington, DC 20240, is the primary author of this rulemaking 
document.

List of Subjects in 50 CFR Part 32

    Fishing, Hunting, Reporting and recordkeeping requirements, 
Wildlife, Wildlife refuges.

    Accordingly, Part 32 of Chapter I of Title 50 of the Code of 
Federal Regulations is amended as follows:

PART 32--[AMENDED]

    1. The authority citation for Part 32 continues to read as follows:

[[Page 31463]]

    Authority: 5 U.S.C. 301; 16 U.S.C. 460k, 664, 668dd, and 715i.

Sec. 32.7  [Amended]

    2. Section 32.7, List of refuge units open to hunting and/or 
fishing, is amended to add the alphabetical listing of ``Great Bay 
National Wildlife Refuge'' under the State of New Hampshire.
    3. Section 32.48 New Hampshire is amended by adding the 
alphabetical listing of Great Bay National Wildlife Refuge to read as 
follows:

Sec. 32.48  New Hampshire.

Great Bay National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Hunting of migratory game birds 
is permitted on designated areas of the refuge subject to the following 
conditions:
    1. Waterfowl hunting will not require a permit. Hunting will be 
allowed only from the immediate shoreline of the Bay.
    2. Only portable blinds are permitted. All decoys, blinds, and 
boats must be removed after each day's hunt.
    3. Waterfowl hunters will access shorelines by boat only.
    B. Upland Game Hunting. [Reserved]
    C. Big Game Hunting. Hunting of deer is permitted on designated 
areas of the refuge subject to the following conditions:
    1. Refuge Permits are required for the deer hunt.
    2. Big game hunters are required to wear, in a conspicuous manner 
on the head, chest and back, a minimum of 400 square inches of solid-
colored blaze orange clothing or material.
    D. Sport Fishing. [Reserved]
* * * * *
    Dated: March 15, 1996.
George T. Frampton, Jr.,
Assistant Secretary for Fish and Wildlife and Parks.
[FR Doc. 96-15737 Filed 6-19-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

FR Doc. 96-15733 Book-entry Procedures for Federal Agricultural Mortgage Corporation Securities
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31392-31394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15733]

=======================================================================
-----------------------------------------------------------------------

FARM CREDIT ADMINISTRATION

12 CFR Part 615

RIN 3052-AB70

Book-entry Procedures for Federal Agricultural Mortgage 
Corporation Securities

AGENCY: Farm Credit Administration.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Farm Credit System Reform Act of 1996 (1996 act) provides 
that the Federal Agricultural Mortgage Corporation (Farmer Mac) shall 
have access to the Federal Reserve Banks' book-entry system (Fed book-
entry system). The Farm Credit Administration (FCA) is issuing a final 
rule authorizing the issuance of Farmer Mac securities in book-entry 
format. Farmer Mac will use the Fed book-entry system in connection 
with the issuance and settlement of its unsecured debt securities and 
its guaranteed securities using substantially the same procedures used 
by all other Government-sponsored enterprises (GSEs).

EFFECTIVE DATE: June 13, 1996.

FOR FURTHER INFORMATION CONTACT: Larry W. Edwards, Director, Office of 
Secondary Market Oversight, Farm Credit Administration, McLean, VA 
22102-5090, (703) 883-4051.

SUPPLEMENTARY INFORMATION:

I. Background

    Section 105 of the 1996 act amends sections 8.3(d) and (e) of the 
Farm Credit Act of 1971, as amended (act), to require that Farmer Mac 
have access to the Fed book-entry system and that the Federal Reserve 
Banks Act as depositories for, and as fiscal agents of, Farmer 
Mac.1 Congress mandated Farmer Mac's access to the Fed book-entry 
system as part of a broad-based reform of Farmer Mac's charter and 
statutory authority. Among other reform measures, the 1996 Act 
liberalized Farmer Mac's charter to allow it to pool loans in a fashion 
similar to such other GSEs as the Federal National Mortgage Association 
(Fannie Mae) and the Federal Home Loan Mortgage Corporation (Freddie 
Mac), which operate in the secondary market for mortgage-backed 
securities. To facilitate Farmer Mac's use of its new authority and to 
help it meet its new responsibilities, Congress amended the act to 
``streamline Farmer Mac's business operations,'' including ``providing 
for Farmer Mac's access to

[[Page 31393]]

the book-entry system of the Federal Reserve System.'' 2
---------------------------------------------------------------------------

    \1\ Pub. L. 104-105 (Feb. 10, 1996), 110 Stat. 163-64. 12 U.S.C. 
2279aa-3(d)-(e).
    \2\ H.R. Rep. No. 446, 104th Cong., 2d Sess., pt. 1, at 8 
(1996).
---------------------------------------------------------------------------

    Currently, all Farmer Mac securities (both debt and guaranteed) are 
issued, settled, and traded through the facilities of the Depository 
Trust Company (DTC), one of the private depositories available to 
issuers whose securities are not tradable on the Fed book-entry system. 
DTC's costs (and the costs of other private depositories) are higher 
than those of the Federal Reserve Banks, which results in higher costs 
for Farmer Mac and its investors. Furthermore, it appears that 
investors may differentiate adversely between Farmer Mac's securities 
and all other GSEs' securities because Farmer Mac securities are not 
issued through the Fed book-entry system. Access to the Fed book-entry 
system, therefore, is viewed as an important element in the 
Congressionally mandated effort to reform and revitalize Farmer Mac.

II. Implementing Regulations

    To implement Farmer Mac's new statutory authority to access the Fed 
book-entry system, regulations are necessary to establish a framework 
for issuance and subsequent disposition of Farmer Mac securities issued 
through the Fed book-entry system. Without such regulations, investors 
would not know what law governs the holding, transferring, and pledging 
of the Farmer Mac securities in which they have invested. This 
uncertainty could create a perception of market risk that could 
detrimentally affect investment in Farmer Mac securities and possibly 
could place Farmer Mac securities at a marketing disadvantage compared 
to the securities of other GSEs.3
---------------------------------------------------------------------------

    \3\ All other GSEs that utilize the Fed book-entry system, 
including the Farm Credit System, have regulations in place that 
govern their book-entry securities. See, e.g., 24 CFR part 81 
(Fannie Mae); 1 CFR part 462 (Freddie Mac); 31 CFR part 354 (Student 
Loan Marketing Association (Sallie Mae)).
---------------------------------------------------------------------------

    FCA regulations governing book-entry procedures with respect to 
Farm Credit System (FCS) securities were adopted in 1977 and are 
located at 12 CFR part 615, subpart O. The FCA's book-entry regulations 
are based on the Department of the Treasury's book-entry regulations at 
31 CFR part 357, subpart O. The regulations establish procedures that 
permit FCS banks to utilize the Fed book-entry system in the same way 
as do other GSEs. The FCA extended its book-entry regulations in 1988 
by adding a new subpart R to 12 CFR part 615 to cover securities issued 
by the FCS Financial Assistance Corporation. Rather than duplicating 
the basic book-entry regulations found in subpart O, subpart R 
incorporates by reference the pertinent book-entry provisions from 
subpart O and applies them to the Financial Assistance Corporation.
    The FCA is adopting the same abbreviated approach to applying book-
entry regulations to Farmer Mac in this rulemaking. The final rule 
creates a new subpart S in part 615 that authorizes the issuance of 
Farmer Mac securities in book-entry format pursuant to pertinent 
provisions of subpart O of part 615, which are incorporated by 
reference. The incorporated provisions of subpart O include: 
Secs. 615.5460 (definitions), 615.5465 (authority of Reserve Banks), 
615.5470 (scope and effect of book-entry procedure), 615.5475 (transfer 
or pledge), 615.5480 (withdrawal of securities), 615.5485 (delivery of 
securities), 615.5490 (classes of accounts), 615.5492 (identification 
of accounts), and 615.5494 (servicing book-entry securities, including 
payment of interest and payment at maturity or upon call).

III. Necessity for Immediate Regulatory Action

    In passing the 1996 act, Congress recognized the difficulties 
Farmer Mac has had in meeting its statutory mandate and the resulting 
deterioration in its core capital.4 In what the House Committee on 
Agriculture termed ``the most extensive attempt yet to make Farmer Mac 
a viable secondary market for agricultural real estate and moderate 
rural housing loans,'' 5 the 1996 act eases prior statutory 
operating requirements and expands the activities in which Farmer Mac 
can engage. It is clear that Congress also expects Farmer Mac to act 
quickly to stabilize its financial position and rebuild its core 
capital. Section 117 of the 1996 act requires that, if Farmer Mac does 
not complete mandatory recapitalization of its core capital within 2 
years, its activities will be critically restricted. If the 2-year goal 
is not met, Farmer Mac will not be allowed to purchase a new qualified 
loan or issue or guarantee a new loan-backed security.6
---------------------------------------------------------------------------

    \4\ H.R. Rep. No. 446, supra note 2, at 9.
    \5\ Id. at 8.
    \6\ Pub. L. 104-105, supra note 1, Sec. 117.
---------------------------------------------------------------------------

    In the very near future, Farmer Mac plans to issue debt securities 
backed by mortgages purchased by Farmer Mac pursuant to its new 
authority under the 1996 act. Farmer Mac intends to utilize the Fed 
book-entry system to issue the securities, as sanctioned by the 1996 
act. To avoid creating any ambiguities regarding Farmer Mac's authority 
to obtain access to the Fed book-entry system and to ensure that the 
book-entry treatment of Farmer Mac's securities will be the same as 
that of other GSEs, the FCA is taking expedited action to adopt book-
entry regulations covering Farmer Mac.
    In view of the clear Congressional mandate expressed in the 1996 
act that Farmer Mac have access to the Fed book-entry system and the 
equally clear Congressional intent that Farmer Mac utilize its new 
authorities to rebuild its core capital and meet its other statutory 
mandates as soon as possible, the FCA believes that expedited 
rulemaking action is warranted for book-entry regulations covering 
Farmer Mac. Moreover, the regulations adopted are minor, technical, and 
noncontroversial. For these reasons, the FCA finds good cause to omit 
notice and comment as impracticable, unnecessary, and contrary to the 
public interest pursuant to section 553(b)(B) of the Administrative 
Procedure Act, 5 U.S.C. 553-59 (APA). The same reasons and, in 
particular, the time limit Congress has imposed on Farmer Mac to 
recapitalize its core capital base, provide good cause to adopt an 
effective date for the regulations that is less than 30 days after 
publication in the Federal Register. 5 U.S.C. 553(d). The FCA's finding 
of good cause for expedited rulemaking action also supports specifying 
an effective date for the regulations that is prior to the date of 
filing of the report to Congress required by the Small Business 
Regulatory Enforcement Fairness Act, 5 U.S.C. 801-808. See 5 U.S.C. 
808. Finally, consistent with the reasons for its expedited actions 
under the APA, the FCA finds that, pursuant to section 5.17(c)(2) of 
the act, an emergency exists that requires that these regulations take 
effect prior to the expiration of the 30-day Congressional notice and 
waiting period for final agency regulatory action.
    The FCA notes that the U. S. Treasury Department recently proposed 
TRADES (Treasury/Reserve Automated Debt Entry System) regulations (61 
FR 8420, March 4, 1996), which will govern book-entry treatment of 
Treasury securities. Since FCA's book-entry regulations are based on 
the Treasury's book-entry regulations, the FCA expects to revise all of 
its book-entry regulations, including those covering Farmer Mac, to 
conform with the Treasury's TRADE regulations when they are finalized. 
Accordingly, there will be opportunity for public comment on FCA book-
entry regulations at that time.

[[Page 31394]]

List of Subjects in 12 CFR Part 615

    Accounting, Agriculture, Banks, banking, Government securities, 
Investments, Rural areas.
    For the reasons stated in the preamble, part 615 of chapter VI, 
title 12 of the Code of Federal Regulations is amended to read as 
follows:

PART 615--FUNDING AND FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, 
AND FUNDING OPERATIONS

    1. The authority citation for part 615 is revised to read as 
follows:

    Authority: Secs. 1.5, 1.7, 1.10, 1.11, 1.12, 2.2, 2.3, 2.4, 2.5, 
2.12, 3.1, 3.7, 3.11, 3.25, 4.3, 4.3A, 4.9, 4.14B, 4.25, 5.9, 5.17, 
6.20, 6.26, 8.0, 8.4, 8.6, 8.7, 8.8, 8.10, 8.12 of the Farm Credit 
Act (12 U.S.C. 2013, 2015, 2018, 2019, 2020, 2073, 2074, 2075, 2076, 
2093, 2122, 2128, 2132, 2146, 2154, 2154a, 2160, 2202b, 2211, 2243, 
2252, 2278b, 2278b-6, 2279aa, 2279aa-3, 2279aa-4, 2279aa-6, 2279aa-
7, 2279aa-8, 2279aa-10, 2279aa-12); sec. 301(a) of Pub. L. 100-233, 
101 Stat. 1568, 1608; sec. 105 of Pub. L. 104-105, 110 Stat. 162, 
163-64.

    2. Subpart S is added to read as follows:

Subpart S--Federal Agricultural Mortgage Corporation Securities

Sec.
615.5570  Book-entry procedures for Federal Agricultural Mortgage 
Corporation securities.

Subpart S--Federal Agricultural Mortgage Corporation Securities

Sec. 615.5570  Book-entry procedures for Federal Agricultural Mortgage 
Corporation Securities.

    (a) The Federal Agricultural Mortgage Corporation (Farmer Mac) is a 
Federally chartered instrumentality of the United States and an 
institution of the Farm Credit System, subject to the examination and 
regulation of the Farm Credit Administration.
    (b) Farmer Mac, either in its own name or through an affiliate 
controlled or owned by Farmer Mac, is authorized by section 8.6 of the 
Act:
    (1) To issue and/or guarantee the timely payment of principal and 
interest on securities representing interests in or obligations backed 
by pools of agricultural real estate loans (guaranteed securities); and
    (2) to issue debt obligations (which, together with the guaranteed 
securities described in paragraph (b)(1) of this section, are referred 
to as Farmer Mac securities). Farmer Mac may prescribe the forms, the 
denominations, the rates of interest, the conditions, the manner of 
issuance, and the prices of Farmer Mac securities.
    (c) Farmer Mac securities shall be governed by Secs. 615.5460, 
615.5465, 615.5470, 615.5475, 615.5480, 615.5485, 615.5490, 615.5492, 
and 615.5494. In interpreting those sections for purposes of this 
section, the term ``Farmer Mac securities'' shall be read for ``Farm 
Credit securities,'' and ``Farmer Mac'' shall be read for ``banks of 
the Farm Credit System'' and ``Farm Credit bank.''

    Dated: June 14, 1996.
Floyd Fithian,
Secretary, Farm Credit Administration.
[FR Doc. 96-15733 Filed 6-19-96; 8:45 am]
BILLING CODE 6705-01-P

Complete official Federal Register PDF

FR Doc. 96-15726 Indirect Food Additives: Adjuvants, Production Aids, and Sanitizers
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31395-31397]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15726]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration

21 CFR Part 178

[Docket No. 92F-0339]

Indirect Food Additives: Adjuvants, Production Aids, and 
Sanitizers

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule.

-----------------------------------------------------------------------

[[Page 31396]]

SUMMARY: The Food and Drug Administration (FDA) is amending the food 
additive regulations to provide for the safe use of an aqueous solution 
of chlorine dioxide and related oxychloro species, generated by 
acidification of an aqueous solution of sodium chlorite with a solution 
of sodium gluconate, citric acid, phosphoric acid, and sodium mono- and 
didodecylphenoxybenzenedisulfonate, as a sanitizing solution to be used 
on food-processing equipment and utensils, including dairy-processing 
equipment. This action responds to a petition filed by Rio Linda 
Chemical Co.

DATES: Effective June 20, 1996 written objections and requests for a 
hearing by July 22, 1996. The Director of the Office of the Federal 
Register approves the incorporation by reference in accordance with 5 
U.S.C. 552(a) and 1 CFR part 51 of a publication listed in 
Sec. 178.1010 (21 CFR 178.1010), effective June 20, 1996.

ADDRESSES: Submit written objections to the Dockets Management Branch 
(HFA-305), Food and Drug Administration, 12420 Parklawn Dr., rm. 1-23, 
Rockville, MD 20857.

FOR FURTHER INFORMATION CONTACT: Mitchell Cheeseman, Center for Food 
Safety and Applied Nutrition (HFS-217), Food and Drug Administration, 
200 C St. SW., Washington, DC 20204, 202-418-3083.

SUPPLEMENTARY INFORMATION: In a notice published in the Federal 
Register of September 22, 1992 (57 FR 43741), FDA announced that a food 
additive petition (FAP 2B4334) had been filed by Rio Linda Chemical 
Co., c/o 1414 Fenwick Lane, Silver Spring, MD 20910. The petition 
proposed that the food additive regulations be amended in Sec. 178.1010 
Sanitizing solutions (21 CFR 178.1010) to provide for the safe use of 
an aqueous solution of chlorine dioxide and related oxychloro species, 
generated by acidification of an aqueous solution of sodium chlorite 
with sodium gluconate, citric acid, phosphoric acid, and sodium 
alkylphenoxybenzenedisulfonate, as a sanitizing solution to be used on 
food-contact surfaces, food-processing equipment, and utensils. Based 
on information in the food additive petition, FDA has determined that a 
more specific and therefore more appropriate name for the form of 
sodium alkylphenoxybenzenedisulfonate used to generate the subject 
sanitizing solution is sodium mono- and 
didodecylphenoxybenzenedisulfonate. This more specific name will be 
used throughout the remainder of this document.

I. Safety and Functional Effect of Petitioned Use of the Additive

    -Sanitizing solutions are mixtures of chemicals that function 
together to sanitize food-contact surfaces and are regulated as such. 
Each listed component in a sanitizing solution has a functional effect, 
and the agency evaluates the data submitted in support of the efficacy 
of the entire sanitizing solution. The subject sanitizing solution is 
an aqueous solution of chlorine dioxide and related oxychloro species, 
generated by acidification of an aqueous solution of sodium chlorite 
with a solution of sodium gluconate, citric acid, phosphoric acid, and 
sodium mono- and didodecylphenoxybenzenedisulfonate. The functions of 
these components, and the basis for FDA's determination of the safety 
of these components in the subject sanitizer, are described below.

A. Chlorine Dioxide

     Chlorine dioxide functions as an antimicrobial agent in the 
subject sanitizing solution. Chlorine dioxide is regulated for use in 
sanitizing solutions under Sec. 178.1010(b)(34) and is regulated for 
use as an antimicrobial agent in water used in poultry processing under 
21 CFR 173.69. On the basis of the data submitted in support of the 
already-regulated uses of chlorine dioxide, the data contained in the 
food additive petition submitted in support of this sanitizing 
solution, and studies in the scientific literature, FDA finds that the 
use of chlorine dioxide in the subject sanitizing solution is safe 
(Ref. 1).

B. Sodium Gluconate

    -Sodium gluconate functions as a sequestering agent in the subject 
sanitizing solution. Sodium gluconate is listed as GRAS for use in food 
as a sequestering agent under 21 CFR 182.6757. In addition, FDA 
regulations permit the addition to a sanitizing solution of any 
substance that is GRAS for use in food (Sec. 178.1010(b)). On the basis 
of the data supporting the GRAS status of sodium gluconate, FDA finds 
that the use of sodium gluconate in the subject sanitizing solution is 
safe (Ref. 1).

 C. Citric Acid

    Citric acid functions as a sequestering agent in the subject 
sanitizing solution. Citric acid is affirmed as GRAS for use in food 
under 21 CFR 184.1033. In addition, as stated in the previous 
paragraph, FDA regulations permit the addition to a sanitizing solution 
of any substance that is GRAS for use in food. On the basis of the data 
supporting the GRAS status of citric acid, FDA finds that the use of 
citric acid in the subject sanitizing solution is safe (Ref. 1).

D. Phosphoric Acid

    -Phosphoric acid functions as an activator in the subject 
sanitizing solution. Phosphoric acid is listed as GRAS for use in food 
under 21 CFR 182.1073. In addition, FDA regulations permit the addition 
to a sanitizing solution of any substance that is GRAS for use in food. 
On the basis of the data supporting the GRAS status of phosphoric acid, 
FDA finds that the use of phosphoric acid in the subject sanitizing 
solution is safe (Ref. 1).

 E. Sodium Mono- and Didodecylphenoxybenzenedisulfonate

    -Sodium mono- and didodecylphenoxybenzenedisulfonate functions as a 
surfactant in the subject sanitizing solution. Sodium mono- and 
didodecylphenoxybenzenedisulfonate is regulated for use as an 
emulsifier and surface active agent in the manufacture of food-contact 
materials under the listing for sodium mono- and 
dialkylphenoxybenzenedisulfonate in 21 CFR 178.3400(c). On the basis of 
the data submitted in support of the already-regulated use of sodium 
mono- and didodecylphenoxybenzenedisulfonate and the data contained in 
the food additive petition submitted in support of this sanitizing 
solution, FDA finds that the use of sodium mono- and 
didodecylphenoxybenzenedisulfonate in the subject sanitizing solution 
is safe (Ref. 1).

 F. Conclusion on Safety

    -As discussed above, FDA has evaluated data on the antimicrobial 
efficacy of the entire sanitizing solution and data in the petition and 
other relevant materials on the safety of each of the components of the 
sanitizing solution. On the basis of this evaluation, the agency 
concludes that these data and materials establish the safety and 
efficacy of the additive for use as a sanitizing solution on food-
processing equipment and utensils including dairy-processing equipment, 
and that the regulations should be amended in Sec. 178.1010 as set 
forth below.
    In accordance with Sec. 171.1(h) (21 CFR 171.1(h)), the petition 
and the documents that FDA considered and relied upon in reaching its 
decision to approve the petition are available for inspection at the 
Center for Food Safety and Applied Nutrition by appointment with the 
information contact person listed above. As provided in 21 CFR 
171.1(h), the agency will delete from the documents any materials that 
are not

[[Page 31397]]

available for public disclosure before making the documents available 
for inspection.

II. Environmental Impact

    The agency has carefully considered the potential environmental 
effects of this action. FDA has concluded that the action will not have 
a significant impact on the human environment, and that an 
environmental impact statement is not required. The agency's finding of 
no significant impact and the evidence supporting that finding, 
contained in an environmental assessment, may be seen in the Dockets 
Management Branch (address above) between 9 a.m. and 4 p.m., Monday 
through Friday.

III. Reference

    The following reference has been placed on display in the Dockets 
Management Branch (address above) and may be seen by interested persons 
between 9 a.m. and 4 p.m., Monday through Friday.

     1. Memorandum entitled ``FOAM ADD 10--A terminal no-rinse 
sanitizer--Manufactured by Rio Linda Chemical Corp.,'' dated June 
10, 1994.

 IV. Filing of Objections

    Any person who will be adversely affected by this regulation may at 
any time on or before July 22, 1996 file with the Dockets Management 
Branch (address above) written objections thereto. Each objection shall 
be separately numbered, and each numbered objection shall specify with 
particularity the provisions of the regulation to which objection is 
made and the grounds for the objection. Each numbered objection on 
which a hearing is requested shall specifically so state. Failure to 
request a hearing for any particular objection shall constitute a 
waiver of the right to a hearing on that objection. Each numbered 
objection for which a hearing is requested shall include a detailed 
description and analysis of the specific factual information intended 
to be presented in support of the objection in the event that a hearing 
is held. Failure to include such a description and analysis for any 
particular objection shall constitute a waiver of the right to a 
hearing on the objection. Three copies of all documents shall be 
submitted and shall be identified with the docket number found in 
brackets in the heading of this document. Any objections received in 
response to the regulation may be seen in the Dockets Management Branch 
between 9 a.m. and 4 p.m., Monday through Friday.

-List of Subjects in 21 CFR Part 178

    -Food additives, Food packaging, Incorporation by reference.
    -Therefore, under the Federal Food, Drug, and Cosmetic Act and 
under authority delegated to the Commissioner of Food and Drugs and 
redelegated to the Director, Center for Food Safety and Applied 
Nutrition, 21 CFR part 178 is amended as follows:

-PART 178--INDIRECT FOOD ADDITIVES: ADJUVANTS, PRODUCTION AIDS, AND 
SANITIZERS

     1. The authority citation for 21 CFR part 178 continues to read as 
follows:

    -Authority: Secs. 201, 402, 409, 721 of the Federal Food, Drug, 
and Cosmetic Act (21 U.S.C. 321, 342, 348, 379e).

     2. Section 178.1010 is amended by adding new paragraphs (b)(46) 
and (c)(40) to read as follows:

Sec. 178.1010  Sanitizing solutions.

 * * * * *
     (b) * * *
     (46) An aqueous solution of chlorine dioxide and related oxychloro 
species generated by acidification of an aqueous solution of sodium 
chlorite with a solution of sodium gluconate, citric acid, phosphoric 
acid, and sodium mono- and didodecylphenoxybenzenedisulfonate. In 
addition to use on food-processing equipment and utensils, this 
solution may be used on dairy-processing equipment.
 * * * * *
    (c) * * *
    (40) The solution identified in paragraph (b)(46) of this section 
shall provide, when ready for use, at least 100 parts per million and 
not more than 200 parts per million of chlorine dioxide as determined 
by the method developed by Bio-cide International, Inc., entitled, 
``Iodometric Method for the Determination of Available Chlorine Dioxide 
(50-250 ppm Available ClO2),'' dated June 11, 1987, which is 
incorporated by reference in accordance with 5 U.S.C. 552(a) and 1 CFR 
part 51. Copies of this method are available from the Division of 
Petition Control, Center for Food Safety and Applied Nutrition (HFS-
215), Food and Drug Administration, 200 C St. SW., Washington, DC 
20204, and may be examined at the Center for Food Safety and Applied 
Nutrition's Library, Food and Drug Administration, 200 C St. SW., rm. 
3321, Washington, DC, or at the Office of the Federal Register, 800 
North Capitol St. NW., suite 700, Washington, DC; at least 380 parts 
per million and not more than 760 parts per million of sodium 
gluconate; and at least 960 parts per million and not more than 1,920 
parts per million of sodium mono- and 
didodecylphenoxybenzenedisulfonate. Other components listed under 
paragraph (b)(46) of this section shall be used in the minimum amount 
necessary to produce the intended effect.
 * * * * *

    Dated: June 7, 1996.
Fred R. Shank,
Director, Center for Food Safety and Applied Nutrition.
[FR Doc. 96-15726 Filed 6-19-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-15724 Animal Drugs, Feeds, and Related Products; Neomycin Sulfate Soluble Powder
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31398-31399]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15724]

-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES
21 CFR Parts 520 and 556

Animal Drugs, Feeds, and Related Products; Neomycin Sulfate 
Soluble Powder

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is amending the animal 
drug regulations to reflect approval of a supplemental new animal drug 
application (NADA) filed by The Upjohn Co. and two supplemental 
abbreviated new animal drug applications (ANADA's), one filed by 
Pfizer, Inc., and the other filed by Rhone Merieux, Inc. The 
applications provide for use of neomycin sulfate soluble powder in 
drinking water or in milk for cattle (excluding veal calves), swine, 
sheep, and goats for the treatment and control of colibacillosis. The 
supplements provide for revised preslaughter withdrawal times following 
use of the drug and revised tolerances for neomycin residues in edible 
tissues of treated animals.

EFFECTIVE DATE: June 20, 1996.
FOR FURTHER INFORMATION CONTACT: Melanie R. Berson, Center for 
Veterinary Medicine (HFV-135), Food and Drug Administration, 7500 
Standish Pl., Rockville, MD 20855, 301-594-1643.

SUPPLEMENTARY INFORMATION: The Upjohn Co., Agricultural Division, 
Kalamazoo, MI 49001-0199, filed supplemental NADA 11-315; Pfizer, Inc., 
235 East 42d St., New York, NY 10017, filed supplemental ANADA 200-046; 
Rhone Merieux, Inc., 7101 College Blvd., Overland Park, KS 66210, filed 
supplemental ANADA 200-050. The supplements provide for revised 
withdrawal times for use of neomycin sulfate soluble powder in drinking 
water or in milk for cattle (excluding veal calves), swine, sheep, and 
goats for the treatment and control of colibacillosis (bacterial 
scours) caused by Escherichia coli susceptible to neomycin sulfate. The 
supplements are approved as of April 3, 1996, and Sec. 520.1484(c)(3) 
(21 CFR 520.1484(c)(3)) is amended to reflect the approvals. The basis 
for approval is discussed in the freedom of information summary as 
indicated below. Also, the firms sponsored studies which provided data 
to support revised tolerances for residues of neomycin in the edible 
tissues of cattle, swine, sheep, and goats. Based on evaluation of the 
data as provided in the General Principles for Evaluating the Safety of 
Compounds Used in Food-Producing Animals Guidelines, tolerances of 1.2 
parts per million (ppm) in muscle, 3.6 ppm in liver, and 7.2 ppm in 
kidney and fat, and withdrawal times of 1 day for cattle, 2 days for 
sheep, and 3 days for swine and goats, are established. The revised 
withdrawal times are provided in Sec. 520.1484(c)(3). The revised 
tolerances for neomycin residues are established in amended 21 CFR 
556.430.
    In accordance with the freedom of information provisions of part 20 
(21 CFR part 20) and Sec. 514.11(e)(2)(ii) (21 CFR 514.11(e)(2)(ii)), a 
summary of safety and effectiveness data and information submitted to 
support approval of this application may be seen in the Dockets 
Management Branch (HFA-305), Food and Drug Administration, 12420 
Parklawn Dr., rm. 1-23, Rockville, MD 20857, between 9 a.m. and 4 p.m., 
Monday through Friday.
    Under section 512(c)(2)(F)(iii) of the Federal Food, Drug, and 
Cosmetic Act (21 U.S.C. 360b(c)(2)(F)(iii)), these approvals do not 
qualify for marketing exclusivity because the applications do not 
contain reports of new clinical or field investigations (other than 
bioequivalence or residue studies) or new human food safety studies 
(other than bioequivalence or residue studies) essential to the 
approvals and conducted or sponsored by the applicants.
    The agency has determined under 21 CFR 25.24(d)(1)(i) that this 
action is of a type that does not individually or cumulatively have a 
significant effect on the human environment. Therefore, neither an 
environmental assessment nor an environmental impact statement is 
required.

List of Subjects

21 CFR Part 520

    Animal drugs.

21 CFR Part 556

    Animal drugs, Foods.
    Therefore, under the Federal Food, Drug, and Cosmetic Act and under 
authority delegated to the Commissioner of Food and Drugs and 
redelegated to the Center for Veterinary Medicine, 21 CFR parts 520 and 
556 are amended as follows:

PART 520--ORAL DOSAGE FORM NEW ANIMAL DRUGS

    1. The authority citation for 21 CFR part 520 continues to read as 
follows:

    Authority: Sec. 512 of the Federal Food, Drug, and Cosmetic Act 
(21 U.S.C. 360b).

    2. Section 520.1484 is amended in paragraph (c)(3) by revising the 
last sentence to read as follows:

[[Page 31399]]

Sec. 520.1484  Neomycin sulfate soluble powder.

* * * * *
    (c) *  *  *
    (3) *  *  * Discontinue treatment prior to slaughter as follows: 
For sponsor 059130--cattle and goats, 30 days; swine and sheep, 20 
days; for sponsors 000009, 000069, 050604--cattle (not for use in veal 
calves), 1 day; sheep, 2 days; swine and goats, 3 days.

PART 556--TOLERANCES FOR RESIDUES OF NEW ANIMAL DRUGS IN FOOD

    3. The authority citation for 21 CFR part 556 continues to read as 
follows:

    Authority: Secs. 402, 512, 701 of the Federal Food, Drug, and 
Cosmetic Act (21 U.S.C. 342, 360b, 371).

    4. Section 556.430 is revised to read as follows:

Sec. 556.430  Neomycin.

    A tolerance of 7.2 parts per million (ppm) is established for 
residues of parent neomycin (marker residue) in uncooked edible kidney 
(target tissue), 7.2 ppm in fat, 3.6 ppm in liver, 1.2 ppm in muscle of 
cattle, swine, sheep, and goats. A tolerance of 0.15 ppm is established 
for neomycin in milk.

    Dated: May 31, 1996.
Stephen F. Sundlof,
Director, Center for Veterinary Medicine.
[FR Doc. 96-15724 Filed 6-19-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-15705 Railroad Employers' Reports and Responsibilities
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31395]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15705]

=======================================================================
-----------------------------------------------------------------------

RAILROAD RETIREMENT BOARD

20 CFR Part 209

RIN 3220-AB16

Railroad Employers' Reports and Responsibilities

AGENCY: Railroad Retirement Board.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Railroad Retirement Board (Board) hereby amends its 
regulations to add sections to permit employers to dispose of payroll 
records after five years, and for the utilization of payroll records to 
credit service under the Railroad Retirement Act in the case of 
employers that have ceased operations. These amendments will alleviate 
needless record retention and ease reporting requirements for employers 
that have permanently ceased operations.

EFFECTIVE DATE: June 20, 1996.

ADDRESSES: Secretary to the Board, Railroad Retirement Board, 844 Rush 
Street, Chicago, Illinois 60611.

FOR FURTHER INFORMATION CONTACT: Thomas W. Sadler, Assistant General 
Counsel, Railroad Retirement Board, 844 Rush Street, Chicago, Illinois 
60611, (312) 751-4513, TDD (312) 751-4701.

SUPPLEMENTARY INFORMATION: Employer reports are used to establish 
employee compensation and service records. These reports are based on 
payroll records. The Board's rules and procedures regarding the 
authorization of disposal of these records and the utilization of 
payroll records of employers who have abandoned service in lieu of 
employer reports are presently contained in Board Orders, which are not 
readily available to the public. Accordingly, the Board adopts 
regulations specifying that railroad employers may dispose of payroll 
records more than five years old where there is no dispute pending as 
to the compensation reported for the periods covered by those records. 
The Board also to amends its regulations to provide that the Board will 
accept payroll records in lieu of prescribed reports if there is no 
official of the employer available to prepare and certify to the 
accuracy of such reports and if the tax liability involved has been 
discharged.
    On February 15, 1996, the Board published this rule as a proposed 
rule (61 FR 5970) inviting comments on or before April 15, 1996. No 
comments were received. No changes have been made to the proposed rule. 
The Board, with the concurrence of the Office of Management and Budget, 
has determined that this is not a significant regulatory action under 
Executive Order 12866; therefore, no regulatory impact analysis is 
required. There are no information collections associated with this 
rule.

List of Subjects in 20 CFR Part 209

    Railroad employees, Railroad retirement, Railroads.

    For the reasons set out in the preamble, title 20, chapter II, part 
209 of the Code of Federal Regulations is amended as follows:

PART 209--RAILROAD EMPLOYERS' REPORTS AND RESPONSIBILITIES

    1. The authority citation for part 209 continues to read as 
follows:

    Authority: 45 U.S.C. 231f.

    2. Part 209 is amended by adding Secs. 209.16 and 209.17 to read as 
follows:

Sec. 209.16  Disposal of payroll records.

    Employers may dispose of payroll records for periods subsequent to 
1936, provided that the payroll records are more than five years old 
and that there is no dispute pending pertaining to the compensation 
reported for the period of those records.

Sec. 209.17  Use of payroll records as returns of compensation.

    Payroll records of employers which have permanently ceased 
operations may be accepted in lieu of prescribed reports provided that 
there is no official of the employer available to prepare and certify 
to the accuracy of such reports and, provided further that any employer 
and employee tax liability incurred under the Railroad Retirement Tax 
Act has been discharged.

    Dated: June 11, 1996.

    By Authority of the Board.

    For the Board.
Beatrice Ezerski,
Secretary to the Board.
[FR Doc. 96-15705 Filed 6-19-96; 8:45 am]
BILLING CODE 7905-01-P

Complete official Federal Register PDF

FR Doc. 96-15680 Drawbridge Operation Regulations; Atlantic Intracoastal Waterway, Sunset Beach, NC
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31434-31435]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15680]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 117

[CGD5-95-084]
RIN 2115-AE47

Drawbridge Operation Regulations; Atlantic Intracoastal Waterway, 
Sunset Beach, NC

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: At the request of the North Carolina Department of 
Transportation, the Coast Guard is changing the regulations that govern 
the operation of the drawbridge across the Atlantic Intracoastal 
Waterway, mile 337.9, at Sunset Beach, North Carolina, by extending the 
hours on weekends and holidays during the summer months during which 
the bridge may open only on the hour. This rule is intended to provide 
regularly scheduled drawbridge openings to help reduce motor vehicle 
traffic delays and congestion on the roads and highways linked by this 
drawbridge while providing for the reasonable needs of navigation.

EFFECTIVE DATE: This rule is effective on July 22, 1996.
FOR FURTHER INFORMATION CONTACT: Ann B. Deaton, Bridge Administrator, 
Fifth Coast Guard District, at (804) 398-6222.

SUPPLEMENTARY INFORMATION:

Regulatory History

    On January 23, 1996, the Coast Guard published a Notice of Proposed 
Rulemaking (NPRM) entitled ``Drawbridge Operation Regulations; Atlantic 
Intracoastal Waterway, Sunset Beach, North Carolina'' in the Federal 
Register (61 FR 1725). In addition to publishing the NPRM, the Coast 
Guard also announced the proposed changes in Public Notice 5-881. The 
comment period ended March 8, 1996. One comment was received. A public 
hearing was not requested and one was not held.

Background and Purpose

    The Sunset Beach drawbridge crosses the Atlantic Intracoastal 
Waterway at mile 337.9. The proposed changes were requested by the 
North Carolina Department of Transportation on behalf of the Town of 
Sunset Beach in order to alleviate delays to vehicle traffic caused by 
opening of the draw for passage of recreational vessels after 7 p.m. on 
the weekends and holidays.

Discussion of Comments and Changes

    The NPRM proposed changes to 33 CFR 117.821(b)(6), regulations 
governing operation of a drawbridge across the Atlantic Intrascoastal 
Waterway at Sunset Beach, North Carolina. The proposed changes include 
extending the hours on weekends and holidays to include 7 p.m. to 9 
p.m. during the summer months when the bridge may open only on the 
hour.
    One comment was received on the proposed change to 33 CFR 
117.821(b)(6) from a recreational boater opposing the extension of the 
hourly openings during the weekends and holidays. The recreational 
boater stated that extending the hourly openings was an unreasonable 
burden to pleasure boaters and was particularly bad for those who are 
out on the water returning late in the day. He also stated that the 
present hourly openings of the bridge during weekends was an 
unreasonable burden to pleasure boats, and that North Carolina should 
consider increasing the number of openings for all its regulated 
bridges. The Coast Guard does not agree. All presently regulated 
bridges in North Carolina crossing the Atlantic Intracoastal Waterway 
have schedules which take into consideration the highway traffic 
volumes at those particular locations, keeping in mind the steady flow 
of vessel traffic on this waterway during the summer months. With 
respect to Sunset Beach, the North Carolina Department of 
Transportation has advised the Coast Guard that maintaining the 
existing hourly opening restrictions and extending them by hours in the 
evenings on the weekends and Federal holidays is critical in order to 
avoid severe traffic congestion to and from the island. Vehicular 
traffic is at its highest peak on the island during the summer season, 
and, in particular, on weekends and holidays. This increase in 
vehicular traffic is due to vacationers and residents of surrounding 
communities coming to Sunset Beach to enjoy the ocean and beaches. 
Those from the surrounding communities usually do not leave the island 
until sunset which extends the evening hours that SR 1172 is congested 
with cars. The increase in traffic also places a strain on the local 
streets in the Town of Sunset Beach. The need to free up traffic 
congestion coming from the island supports the request to extend hourly 
openings on weekends and holidays. Recreational boaters can plan their 
transits around the hourly schedule, as they do now. After 9 p.m., the 
drawbridge will revert back to opening on demand, so boasters may plan 
to

[[Page 31435]]

come and go as early or late as they desire, with minimal delays. The 
purpose of the proposed change is to establish a schedule that balances 
the reasonable needs of waterway and vehicular traffic. The Coast Guard 
believes this schedule will help alleviate seasonal highway traffic 
congestion on weekends and holidays at this bridge without placing any 
undue hardship on waterway users since the change is minimal.
    This final rule adopts the changes proposed in the NPRM. It extends 
the hourly opening of the drawbridge from 7 p.m. to 9 p.m. on 
Saturdays, Sundays, and Federal holidays from June 1 to September 30. 
The draw will continue to open on signal for commercial vessels. It 
will also continue to open on signal for passage of vessels in 
emergencies involving danger to life or property. The Coast Guard 
believes this final rule will not unduly restrict navigation by 
pleasure vessels, which may plan their transits to coincide with 
scheduled hourly openings.

Regulatory Evaluation

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(1)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation under paragraph 
10e of the regulatory policies and procedures of DOT is unnecessary.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this final rule will have a 
significant economic impact on a substantial number of small entities. 
``Small entities'' include independently owned and operated small 
businesses that are not dominant in their field and that otherwise 
qualify as ``small business concerns'' under section 3 of the Small 
Business Act (15 U.S.C. 632). Because it expects the impact of this 
rule to be minimal, the Coast Guard certifies under 5 U.S.C. 605(b) 
that this rule will not have a significant economic impact on a 
substantial number of small entities.

Collection of Information

    This rule contains no collection of information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism Assessment

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that this rule will not have sufficient federalism implications to 
warrant preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this rule 
and concluded that under section 2.B.2.e.(32)(e) of Commandant 
Instruction M16475.1B (as amended, 59 FR 38654, July 29, 1994), this 
rule is categorically excluded from further environmental 
documentation.

List of Subjects in 33 CFR Part 117

    Bridges.

Regulations

    In consideration of the foregoing, the Coast Guard is amending part 
117 of title 33, Code of Federal Regulations, as follows:

PART 117--DRAWBRIDGE OPERATION REGULATIONS

    1. The authority citation for part 117 continues to read as 
follows:

    Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 
117.255 also issued under the authority of Pub. L. 102-587, 106 
Stat. 5039.

    2. In Sec. 117.821, paragraph (b)(6) is revised to read as follows:

Sec. 117.821  Atlantic Intracoastal Waterway, Albemarle Sound to Sunset 
Beach.

* * * * *
    (b) * * *
    (6) S.R. 1172 bridge, mile 337.9, at Sunset Beach, NC, shall open 
on the hour on signal between 7 a.m. and 7 p.m., April 1 through 
November 30, except that on Saturdays, Sundays and Federal holidays, 
from June 1 through September 30, the bridge shall open on signal on 
the hour between 7 a.m. and 9 p.m.
* * * * *
    Dated: May 15, 1996.
W.J. Ecker,
Rear Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.
[FR Doc. 96-15680 Filed 6-19-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-15671 Radio Broadcasting Services; Cadiz and Oak Grove, KY
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31449]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15671]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 73

[MM Docket No. 93-314; RM-8396]

Radio Broadcasting Services; Cadiz and Oak Grove, KY

AGENCY: Federal Communications Commission.

ACTION: Final rule; petition for reconsideration.

-----------------------------------------------------------------------

SUMMARY: The Chief, Policy and Rules Division, denied the petition for 
reconsideration filed by Southern Broadcasting Corporation of the 
Chief, Allocations Branch's Report and Order, 60 FR 52105, October 5, 
1995, substituting Channel 293C3 for Channel 292A at Cadiz, reallotting 
Channel 293C3 from Cadiz to Oak Grove, Kentucky, and modifying Station 
WKDZ-FM's license accordingly. The Commission denied the petition 
because it failed to present new facts or arguments that were not 
considered in the Report and Order that would warrant a contrary 
decision. With this action, this proceeding is terminated.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Bruce Romano, Mass Media Bureau, (202) 
418-2120.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Commission's 
Memorandum Opinion and Order, MM Docket No. 93-314, adopted May 24, 
1996 and released June 7, 1996. The full text of this Commission 
decision is available for inspection and copying during normal business 
hours in the FCC Reference Center (Room 239), 1919 M Street, NW., 
Washington, DC. The complete text of this decision may also be 
purchased from the Commission's copy contractors, International 
Transcription Service, Inc. (202) 857-3800, 2100 M Street, NW., Suite 
140, Washington, DC 20037.

List of Subjects in 47 CFR Part 73

    Radio broadcasting.

Federal Communications Commission.
Douglas W. Webbink,
Chief, Policy and Rules Division, Mass Media Bureau.
[FR Doc. 96-15671 Filed 6-19-96; 8:45 am]
BILLING CODE 6712-01-F

Complete official Federal Register PDF

FR Doc. 96-15628 Nectarines and Peaches Grown in California; Revision of Handling Requirements for Fresh Nectarines and Peaches
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31387-31391]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15628]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 120 / Thursday, June 20, 1996 / Rules 
and Regulations

[[Page 31387]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Parts 916 and 917

[Docket No. FV95-916-4-FIR]

Nectarines and Peaches Grown in California; Revision of Handling 
Requirements for Fresh Nectarines and Peaches

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture is adopting as a final rule, 
with appropriate modifications, the provisions of an interim final rule 
which revised the handling requirements for California nectarines and 
peaches by modifying the grade, size, maturity, container, and pack 
requirements for fresh shipments of these fruits, beginning with 1996 
season shipments. This rule enables handlers to continue shipping fresh 
nectarines and peaches meeting consumer needs in the interest of 
producers, handlers, and consumers of these fruits.

EFFECTIVE DATE: July 22, 1996.

FOR FURTHER INFORMATION CONTACT: Terry Vawter, Marketing Specialist, 
California Marketing Field Office, Marketing Order Administration 
Branch, Fruit and Vegetable Division, AMS, USDA, 2202 Monterey Street, 
Suite 102B, Fresno, California, 93721; telephone: (209) 487-5901; or 
Kenneth Johnson, Marketing Specialist, Marketing Order Administration 
Branch, Fruit and Vegetable Division, AMS, USDA, P.O. Box 96456, Room 
2523-S, Washington, DC 20090-6456; telephone: (202) 720-2861.

SUPPLEMENTARY INFORMATION: This rule is issued under Marketing 
Agreement and Marketing Order Nos. 916 and 917 [7 CFR Parts 916 and 
917] regulating the handling of nectarines and peaches grown in 
California, hereinafter referred to as the orders. The orders are 
effective under the Agricultural Marketing Agreement Act of 1937, as 
amended [7 U.S.C. 601-674], hereinafter referred to as the Act.
    The Department is issuing this rule in conformance with Executive 
Order 12866.
    This rule has been reviewed under Executive Order 12778, Civil 
Justice Reform. This rule is not intended to have retroactive effect. 
This rule will not preempt any State or local laws, regulations, or 
policies, unless they present an irreconcilable conflict with this 
rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and request a modification of the order or to be exempted 
therefrom. A handler is afforded the opportunity for a hearing on the 
petition. After the hearing the Secretary would rule on the petition. 
The Act provides that the district court of the United States in any 
district in which the handler is an inhabitant, or has his or her 
principal place of business, has jurisdiction to review the Secretary's 
ruling on the petition, provided an action is filed not later than 20 
days after the date of the entry of the ruling.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this action on small entities. The purpose of the 
RFA is to fit regulatory actions to the scale of business subject to 
such actions in order that small businesses will not be unduly or 
disproportionately burdened. Marketing orders issued pursuant to the 
Act, and rules issued thereunder, are unique in that they are brought 
about through group action of essentially small entities acting on 
their own behalf. Thus, both statutes have small entity orientation and 
compatibility.
    There are about 300 California nectarine and peach handlers subject 
to regulation under the orders covering nectarines and peaches grown in 
California, and about 1,800 producers of these fruits in California. 
Small agricultural producers have been defined by the Small Business 
Administration [13 CFR 121.601] as those having annual receipts of less 
than $500,000, and small agricultural service firms are defined as 
those whose annual receipts from all sources are less than $5,000,000. 
A majority of these handlers and producers may be classified as small 
entities. In recent years, average combined sales of peaches and 
nectarines per handler have been about $600,000. Typically, about 
three-fourths of peach and nectarine handlers have sales of less than 
the average for the industry.
    The Nectarine Administrative Committee (NAC) and the Peach 
Commodity Committee (PCC) met December 7, 1995, and unanimously 
recommended that the handling requirements for California nectarines 
and peaches, respectively, be revised. These committees meet prior to 
and during each season to review the rules and regulations effective on 
a continuous basis for California nectarines and peaches under the 
orders. These committee meetings are open to the public, and interested 
persons may express their views at these meetings. The Department 
reviews committee recommendations and information, as well as 
information from other sources, and determines whether modification, 
suspension, or termination of the rules and regulations would tend to 
effectuate the declared policy of the Act.
    This rule finalizes an interim final rule that revised the handling 
requirements for nectarines in Sec. 916.350 California Nectarine 
Container and Pack Regulation (7 CFR 916.350), and in Sec. 916.356 
California Nectarine Grade and Size Regulation (7 CFR 916.356); as well 
as for peaches in Sec. 917.442 California Peach Container and Pack 
Regulation (7 CFR 917.442) and in Sec. 917.459 California Peach Grade 
and Size Regulation (7 CFR 917.459). The interim final rule was issued 
on March 21, 1996, and published in the Federal Register (61 FR 13386, 
March 27, 1996).
    The interim final rule provided a 30-day comment period which ended 
on April 26, 1996. One comment was received from Gary W. Van Sickle, 
Field Director for the NAC and the PCC requesting changes in the 
dimensions and display panel of the new reusable

[[Page 31388]]

and recyclable container. He noted that the size of the box was more 
accurately 12 x 19\3/4\, rather than 12 x 20. He also stated that with 
regard to some styles of the new reusable and recyclable container, the 
lid was not the only display panel upon which a label could be affixed. 
Therefore, he suggested that either the lid or the outside end would be 
appropriate for the new containers.
    Mr. Van Sickle also requested a correction in the size requirement 
for Nectarine 23, a nectarine variety recommended to be removed from 
the variety-specific size requirements and placed in the blanket size 
requirements. Mr. Van Sickle noted that since the December 7, 1995, 
meeting of the NAC, additional information had been received which 
indicated that the Nectarine 23 variety should remain in the variety-
specific requirements. The NAC, as well as the PCC, has a policy of 
recommending the deletion of varieties from the variety-specific 
requirements when shipments of the variety fall below 5,000 packages. 
After receipt of all information, it was determined that the shipments 
of the Nectarine 23 variety for the 1995 season totaled 24,104 
packages, well above the 5,000 package threshold. For that reason, the 
Nectarine 23 variety should remain in the variety-specific size 
requirements for the 1996 season.
    The Department finds that Mr. Van Sickle's suggestions are well 
founded and are incorporated within this rule.

Container and Pack Requirements (Nectarines)

    Section 916.350 specifies container and pack requirements for fresh 
nectarine shipments. Paragraph (a)(4)(iv) of Sec. 916.350 specifies the 
tray-pack size designations which must be marked on loose-filled or 
tight-filled containers, depending on the size of the fruit. The size 
designations specify the maximum number of nectarines in a 16-pound 
sample for each tray-pack size designation. This rule revises paragraph 
(a)(4)(iv) of Sec. 916.350 by modifying one size designation for the 
weight-count standards in Column B of Table 1 for early-season and mid-
season nectarine varieties and one size designation for the weight-
count standards in Column B of Table 2. Continuing research conducted 
by the NAC indicate that early-season and mid-season fruit weighs less 
than late-season fruit and the weight-count standards were, therefore, 
modified for the past two seasons based on that consideration. Results 
from the 1995 season suggest that a minor modification of Table 1 and 
Table 2 is necessary to provide more accurate weight-count standards 
for early-season and mid-season nectarines, and late-season nectarines.
    The NAC recommended these revised weight-count standards for 
nectarines after a comprehensive review of the appropriate 
relationships between the tray-pack containers and loose-filled or 
tight-filled containers for early-season and mid-season nectarine 
varieties, as well as late-season varieties. Specifically, the NAC's 
recommendation provides that the maximum number of nectarines of size 
50 in a 16-pound sample of early-season and mid-season fruit is more 
appropriately 39 rather than 38. Also the maximum number of nectarines 
of size 50 in a 16-pound sample of late-season fruit is more 
appropriately 37 rather than 36.
    Pack regulations provide for uniform packing practices. In 
particular, weight-count standards provide for equality between fruit 
packed in loose-filled or tight-filled containers and fruit packed in 
tray-pack styles.
    According to the NAC, packers occasionally moved fruit from tray-
pack styles of pack to loose-filled or tight-filled pack styles. This 
activity has led to an awareness that fruit which was of proper size 
when tray-packed exceeded the maximum number of nectarines for the 16-
pound sample for corresponding loose-filled or tight-filled pack size. 
In some instances, these samples required an additional piece of fruit 
to meet the 16-pound weight requirement, thus causing the pack to be 
``marked'' smaller than its equivalent tray-pack size. When packs are 
``marked'' smaller this causes the container to be sold for a lower 
price.
    Revised and refined weight-count standards should provide for more 
accurate marking of sizes when packed in loose-filled or tight-filled 
pack styles compared to equivalent sizes that are tray packed. These 
regulations provide for uniformly packed containers of nectarines. 
These regulations also attempt to assure equivalent returns for growers 
based on style of pack used.
    This rule also further clarifies the definition of ``tree ripe'' 
added to Sec. 916.350 paragraph (b) for the 1995 season. According to 
the NAC, ``tree ripe'' is an optional marking with regard to maturity 
that is stamped on containers of nectarines. Currently, the definition 
of tree ripe is based on the California Well Matured maturity 
requirement and is intended to be used for fruit which has been allowed 
to ripen naturally by remaining longer on the tree. California Well 
Matured means that fruit has been picked at a maturity level distinctly 
more advanced than ``mature.'' The definition of ``tree ripe'' was 
added in 1995 so that its meaning was consistent with other descriptive 
markings and provided a consistent minimum maturity level throughout 
the industry to the benefit of consumers. However, during the 1995 
season, some handlers marked their boxes of fruit as ``tree ripened.'' 
It has been recommended by the NAC that the terms ``tree ripe'', and 
``tree ripened'', and other terms which denote an advanced level of 
maturity due to the fruit remaining on the tree for a longer period, 
are interchangeable terms indicative of the enhanced maturity of the 
fruit inside the box. Requiring containers of nectarines to be at a 
minimum California Well Matured in order to be marked ``tree ripe'' or 
``tree ripened'', or other interchangeable terms such as ``ripened on 
the tree'', or ``ripened on tree'' will clarify the current regulation 
by specifying when the ``tree ripe'' or some similar marking using the 
words ``tree'' and ``ripe'', can be used and help to ensure that buyer 
expectations are met.
    The NAC also recommended that a new container, that also allows for 
markings on the lid of the container, be approved for nectarine 
shipments for the 1996 season only. The NAC will review the impact of 
the use of this container with shippers prior to the 1997 season.
    The marketing order, under Sec. 916.350, requires that all 
containers be marked with specific information (e.g. handler, grade, 
size, and variety) and that all such markings on nectarine containers 
have to be applied to the outside end of the container. This has been 
defined as any of the four sides of the container, but not on the lid. 
Currently, there is interest by handlers in containers that are 
reusable thus creating financial savings for handlers. There is now a 
reusable and recyclable container, a single layer, plastic, 12 x 19 \3/
4\ inch box, that is available for use with nectarines. However, the 
design of some styles of the container, which has cooling slots in all 
of its sides, is such that the markings cannot easily be placed on the 
outside end of the container.
    The NAC believes that allowing for markings to be placed on the 
container lid or on the outside end of the container will facilitate 
the use of all styles of this plastic, reusable and recyclable 
container in compliance with marketing order requirements. Authorizing 
the use of this new container will allow handlers to reduce their 
container costs through the continued reuse of the container.

[[Page 31389]]

Maturity Requirements (Nectarines)

    Section 916.356 specifies maturity requirements for fresh 
nectarines in paragraphs (a)(1) and (a)(1)(i), including Table 1. For 
fruit being inspected and certified as meeting the maturity 
requirements for ``well matured'', determinations are generally in 
terms of maturity guides (e.g., color chips) specified in Table 1.
    This rule revises paragraph (a)(1) by exempting certain nectarine 
varieties from the requirement that a blush or red color be present on 
the skin of the nectarines. By their nature, some newer yellow 
nectarine varieties fail to attain any color other than yellow on the 
skin of the fruit. The U. S. Standards for Grades of Nectarines 
requires that a blush or red color be present on the skin of the fruit 
in order for the fruit to be considered as U. S. No. 1 grade.
    This rule also revises Table 1 of paragraph (a)(1)(I) of 
Sec. 916.356 for nectarines to add the maturity guides for four 
nectarine varieties. Specifically, an addition to the maturity guides 
was recommended for Grand Diamond, King Jim, and Spring Brite at a 
maturity guide of L, and Rose Diamond at a maturity guide of J.
    The NAC recommended these maturity requirement changes for these 
nectarine varieties based on a continuing review by the Shipping Point 
Inspection Service of their individual maturity characteristics, and 
the identification of the appropriate color chip corresponding to the 
``well matured'' level of maturity for such variety.

Size Requirements (Nectarines)

    Section 916.356 specifies size requirements for fresh nectarines in 
paragraphs (a)(2) through (a)(9). This rule revises Sec. 916.356 to 
establish variety-specific size requirements for six nectarine 
varieties that were produced in commercially significant quantities of 
more than 10,000 packages for the first time during the 1995 season. 
This rule also modifies the variety-specific size requirements for two 
varieties of nectarines by reassigning those varieties.
    Size regulations are put in place to improve fruit quality by 
allowing fruit to stay on the tree for a greater length of time. This 
increased growing time not only improves maturity and, therefore, the 
quality of the product, but also the size of the fruit. Increased size 
results in increases in the number of packed boxes of nectarines per 
acre. This provides greater consumer satisfaction, more repeat 
purchases, and, therefore, increases returns to growers. Varieties 
recommended for specific size regulation have been reviewed and 
recommendations are based on the characteristics of the variety to 
attain minimum size.
    Paragraph (a)(3) is revised to include the Johnny's Delight and May 
Jim varieties; paragraph (a)(4) is revised to include the Arctic Rose 
variety; and paragraph (a)(6) in Sec. 916.356 is revised to include the 
Flame Glo, Prima Diamond III, Prima Diamond IV, Prima Diamond VIII, and 
the White Jewels nectarine varieties.
    This rule also revises Sec. 916.356 to remove eleven nectarine 
varieties from the variety-specific size requirements specified in the 
section because less than 5,000 packages of each of these varieties 
were produced during the 1995 season. Paragraph (a)(2) of that section 
is revised to remove the Royal Delight nectarine variety. Paragraph 
(a)(4) is revised to remove the Sunfre variety, and paragraph (a)(4) is 
also revised to delete the May Jim variety. This variety was placed in 
this paragraph prior to the 1995 season. The variety matures to a 
smaller-than-average size when compared to other varieties in this 
paragraph. Based upon its sizing characteristics from the 1995 season, 
removal of the May Jim variety from this paragraph was recommended. 
Paragraph (a)(6) is revised to remove the Del Rio Rey, Independence, La 
Pinta, Late Le Grand, Royal Red, Son Red, Sun Grand, and 181-119 
(Sierra Star) nectarine varieties. Paragraph (a)(6) is also revised to 
remove the Arctic Rose variety. This variety was placed in this 
paragraph prior to the 1995 season. The variety matures to a smaller-
than-average size when compared to other varieties in this paragraph. 
Based upon its sizing characteristics from the 1995 season, removal of 
the Arctic Rose variety from this paragraph was recommended.
    Nectarine varieties removed from the nectarine variety-specific 
list become subject to the non-listed variety size requirements 
specified in paragraphs (a)(7), (a)(8), and (a)(9) of Sec. 916.356.
    The NAC recommended these changes in the minimum size requirements 
based on a continuing review of the sizing and maturity relationships 
for these nectarine varieties, and consumer acceptance levels for 
various sizes of fruit. This rule is designed to establish minimum size 
requirements for fresh nectarines consistent with expected crop and 
market conditions.

Container and Pack Requirements (Peaches)

    Section 917.442 currently specifies container and pack requirements 
for fresh peach shipments. Paragraph (a)(4)(iv) of Sec. 917.442 
specifies the tray-pack size designations which must be marked on 
loose-filled or tight-filled containers, depending on the size of the 
fruit. The size designations specify the maximum number of peaches in a 
16-pound sample for each tray pack size designation. This rule revises 
paragraph (a)(4)(iv) of Sec. 917.442 by modifying one size designation 
for the weight-count standards in Column B of Table 1 for early-season 
and mid-season peach varieties. Research conducted by the PCC indicated 
that early-season and mid-season fruit weighs less than late-season 
fruit and the weight-count standards were, therefore, modified for the 
past two seasons based on that consideration. Results from the 1995 
season suggest that a minor modification of Table 1 is necessary to 
provide more accurate weight-count standards for early-season and mid-
season peaches.
    The PCC recommended the revised container marking requirement 
changes for peaches after a comprehensive review of the appropriate 
relationships between the tray-pack containers and loose-filled or 
tight-filled containers for early-season and mid-season peach varieties 
prior to the 1996 season. Specifically, the PCC's recommendation 
provides that the maximum number of peaches of size 54 in a 16-pound 
sample of early-season and mid-season fruit is more appropriately 44 
rather than 43.
    Pack regulations provide for uniform packing practices. In 
particular, weight-count standards provide for equality between fruit 
packed in loose-filled or tight-filled containers and fruit packed in 
tray-pack styles.
    According to the PCC, packers occasionally moved fruit from tray-
pack styles of pack to loose-filled or tight-filled pack styles. This 
activity has led to an awareness, especially in regard to early-season 
varieties, that fruit which was of proper size when tray-packed 
exceeded the maximum number of peaches for the 16-pound sample for 
corresponding loose-filled or tight-filled pack size. In some 
instances, these samples needed an additional piece of fruit to meet 
the 16-pound weight requirement, thus causing the pack to be ``marked'' 
smaller than its equivalent tray-pack size. When packs are ``marked'' 
smaller this causes the container to be sold for a lower price. During 
the 1994 season, new weight-count assignments for early varieties

[[Page 31390]]

were in place. Research continued with the purpose of possible 
refinement of those weight-count assignments.
    Revised and refined weight-count standards for early varieties 
should provide for more accurate marking of size when packed in loose-
filled or tight-filled pack styles compared to equivalent sizes that 
are tray packed. These regulations provide for uniformly packed 
containers of peaches. These regulations also attempt to assure 
equivalent returns for growers based on style of pack used.
    This rule also further clarifies the definition of ``tree ripe'' 
added to Sec. 917.442 paragraph (b) for the 1995 season. According to 
the PCC, ``tree ripe'' is an optional marking with regard to maturity 
that is stamped on containers of peaches. Currently the definition of 
tree ripe is based on the California Well Matured maturity requirement 
and is intended to be used for fruit which has been allowed to ripen 
naturally by remaining longer on the tree. California Well Matured 
means that fruit has been picked at a maturity level distinctly more 
advanced than ``mature.'' The definition of ``tree ripe'' was added in 
1995 so that its meaning was consistent with other descriptive markings 
and provided a consistent minimum maturity level throughout the 
industry to the benefit of consumers. However, during the 1995 season, 
some handlers marked their boxes of fruit as ``tree ripened.'' It has 
been recommended by the PCC that the terms ``tree ripe'' and ``tree 
ripened'' and other terms which denote an advanced level of maturity 
due to the fruit remaining on the tree for a longer period, are 
interchangeable terms indicative of the enhanced maturity of the fruit 
inside the box. Requiring containers of peaches to be at a minimum 
California Well Matured in order to be marked ``tree ripe'' or ``tree 
ripened'', or other interchangeable terms such as ``ripened on the 
tree'', or ``ripened on tree'' will clarify the current regulation by 
specifying when the ``tree ripe'' or some similar marking using the 
words ``tree'' and ``ripe'' can be used and help to ensure that buyer 
expectations are met.
    The PCC also recommended that a new container, that also allows for 
markings on the container lid, be approved for peach shipments for the 
1996 season only. The PCC will review the impact of this container with 
shippers prior to the 1997 season.
    The marketing order, under Sec. 917.442, requires that all 
containers be marked with specific information (e.g. handler, grade, 
size, and variety) and that all such markings on peach containers have 
to be applied to the outside end of the container. This has been 
defined as any of the four sides of the container, but not on the lid. 
Currently, there is interest by handlers in containers that are 
reusable thus creating financial savings for handlers. There is now a 
reusable and recyclable container, a single layer, plastic, 12  x  
19\3/4\ inch box, that is available for use with peaches. However, the 
design of some styles of the container, which has cooling slots in all 
of its sides, is such that the markings cannot easily be placed on the 
outside end of the container.
    The PCC believes that allowing for markings to be placed on the 
container lid or on the outside end of the container will facilitate 
the use of all styles of this plastic, reusable and recyclable 
container in compliance with marketing order requirements. Authorizing 
the use of this new container will allow handlers to reduce their 
container costs through the continued reuse of the container.

Maturity Requirements (Peaches)

    Section 917.459 specifies maturity requirements for fresh peaches 
in paragraph (a)(1), including TABLE 1. For fruit being inspected and 
certified as meeting the maturity requirements for ``well matured'', 
maturity determinations are generally in terms of maturity guides 
(e.g., color chips) specified in Table 1. This rule revises Table 1 of 
paragraph (a)(1)(ii) of Sec. 917.459 for peaches to change the maturity 
guide for the Elegant Lady peach variety from a maturity guide M to a 
maturity guide L. It also adds two peach varieties for which color 
chips had not been established previously. The Early Delight peach 
variety has been recommended to be added with a maturity guide H and 
the May Sun variety has been recommended to be added with a maturity 
guide I.
    The PCC recommended these maturity requirement changes for these 
peach varieties based on a continuing review by the Shipping Point 
Inspection Service of their individual maturity characteristics, and 
the identification of the appropriate color chip corresponding to the 
``well matured'' level of maturity for such varieties.

Size Requirements (Peaches)

    Section 917.459 specifies size requirements for fresh peaches in 
paragraphs (a)(2) through (a)(6), and paragraphs (b) and (c). This rule 
also revises Sec. 917.459 to establish variety-specific size 
requirements for six peach varieties that were produced in commercially 
significant quantities of more than 10,000 packages for the first time 
during the 1995 season.
    Size regulations are put in place to improve fruit quality by 
allowing fruit to stay on the tree for a greater length of time. This 
increased growing time not only improves maturity, and, therefore, the 
quality of the product, but also size of the fruit. Increased size 
results in increases in the number of packed boxes of peaches per acre. 
This provides greater consumer satisfaction, more repeat purchases, 
and, therefore, increases returns to growers. Varieties recommended for 
specific size regulation have been reviewed and recommendations are 
based on the characteristics of the variety to attain minimum size.
    In Sec. 917.459 paragraph (a)(5) is revised to include the May Sun 
peach variety; and paragraph (a)(6) is revised to include the July Sun, 
Kaweah, Snow Giant, Snow King, and Sugar Giant peach varieties.
    This rule also revises Sec. 917.459 to remove eleven peach 
varieties from the variety-specific size requirements specified in that 
section, because less than 5,000 packages of each of these varieties 
were produced during the 1995 season. In Sec. 917.459 paragraph (a)(2) 
of Sec. 917.459 is revised to remove the Flordaprince peach variety; 
paragraph (a)(5) is revised to remove the First Lady, Merrill Gem, 
Royal May, Sierra Crest, Summer Crest, and 50-178 peach varieties; and 
paragraph (a)(6) is revised to remove the Angelus, August Delight, 
Parade, and Scarlet Lady peach varieties. Peach varieties removed from 
the variety-specific list become subject to the non-listed variety size 
requirements specified in paragraphs (b) and (c) of Sec. 917.459.
    The removal of the Flordaprince variety from paragraph (a)(2) 
results in there being no varieties regulated within size 96 for the 
1996 season. Since the variety-specific list is subject to change from 
one season to another, the Department wishes to reserve paragraph 
number (a)(2) for future regulation of peaches at size 96.
    The PCC recommended these changes in the minimum size requirements 
based on a continuing review of the sizing and maturity relationships 
for these peach varieties, and the consumer acceptance levels for 
various sizes fruit. This rule is designed to establish minimum size 
requirements for fresh peaches consistent with expected crop and market 
conditions.
    In addition, this rule revises paragraph (a)(6) of Sec. 917.459 by 
adding three peach varieties which were inadvertently removed from this 
paragraph, and deleting three varieties which were left in this 
paragraph. Those peach varieties which are being added

[[Page 31391]]

to paragraph (a)(6) of Sec. 917.459 include the Fancy Lady, Snow Ball, 
and Sugar Lady peach varieties. Those peach varieties which were 
inadvertently left in the variety-specific size requirement at 
paragraph (a)(6) of Sec. 917.459 and are being removed include the July 
Lady, Red Cal, and Redglobe peach varieties. The Sugar Giant peach 
variety should also be added to the variety-specific size requirement 
in paragraph (a)(6) of Sec. 917.459. This variety was recommended to be 
added by the PCC in 1996 and was inadvertently left out of the interim 
final rule.
    Further, this rule revises paragraph (a)(6) of Sec. 917.459 by 
changing the name of the peach variety, Red Boy. The exclusive handler 
of this peach variety changed the name in the 1995 season. For that 
reason, the name of the Red Boy peach variety is changed to Red Dancer.
    This rule reflects the committees' and the Department's appraisal 
of the need to revise the handling requirements for California 
nectarines and peaches, as specified. The Department's determination is 
that this rule will have a beneficial impact on producers, handlers, 
and consumers of California nectarines and peaches.
    This rule establishes handling requirements for fresh California 
nectarines and peaches consistent with expected crop and market 
conditions, and will help ensure that all shipments of these fruits 
made each season will meet acceptable handling requirements established 
under each of these orders. This rule will also help the California 
nectarine and peach industries provide fruit desired by consumers. This 
rule is designed to establish and maintain orderly marketing conditions 
for these fruits in the interest of producers, handlers, and consumers. 
Therefore, the Administrator of the AMS has determined that this rule 
will not have a significant economic impact on a substantial number of 
small entities.
    After consideration of all relevant matters presented, the 
information and recommendations submitted by the committees, and other 
information, it is found that the rule, as hereinafter set forth, will 
tend to effectuate the declared policy of the Act.

List of Subjects

7 CFR Part 916

    Marketing agreements, Nectarines, Reporting and recordkeeping 
requirements.

7 CFR Part 917

    Marketing agreements, Peaches, Pears, Reporting and recordkeeping 
requirements.

    Accordingly, the interim final rule amending 7 CFR parts 916 and 
917 which was published at 61 FR 13386 on March 27, 1996, is adopted as 
a final rule with the following changes:

PART 916--NECTARINES GROWN IN CALIFORNIA

    1. The authority citation for 7 CFR Part 916 continues to read as 
follows:

    Authority: 7 U.S.C. 601-674.

Sec. 916.350  [Amended]

    2. In Sec. 916.350, paragraph (c) is revised to read as follows:

Sec. 916.350  California Nectarine Container and Pack Regulation.

* * * * *
    (c) Each container of nectarines in plastic, 12  x  19\3/4\ inch 
reusable and recyclable containers shall meet and bear, on the 
container lid or on the outside end, all applicable marking 
requirements under the order.

Sec. 916.356  [Amended]

    3. In Sec. 916.356, paragraph (a)(6) is amended by adding the name 
``Nectarine 23''.

PART 917--FRESH PEARS AND PEACHES GROWN IN CALIFORNIA

    1. The authority citation for 7 CFR Part 917 continues to read as 
follows:

    Authority: 7 U.S.C. 601-674.

Sec. 917.442  [Amended]

    2. In Sec. 917.442, paragraph (c) is revised to read as follows:

Sec. 917.442  California Peach Container and Pack Regulation.

* * * * *
    (c) Each container of peaches in plastic, 12  x  19\3/4\ inch 
reusable and recyclable containers shall meet and bear, on the 
container lid or on the outside end, all applicable marking 
requirements under the order.

Sec. 917.459  [Amended]

    3. In Sec. 917.459, paragraph (a)(6) is amended by adding the names 
``Fancy Lady,'' ``Red Dancer'', ``Snow Ball'', ``Sugar Giant'', and 
``Sugar Lady'', and removing the names ``July Lady'', ``Red Boy'', 
``Red Cal'', and ``Redglobe''.

    Dated: June 13, 1996.
Sharon Bomer Lauritsen,
Acting Director, Fruit and Vegetable Division.
[FR Doc. 96-15628 Filed 6-19-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-15621 Clean Air Act Final Interim Approval of Operating Permits Program; Delegation of Section 112 Standards; State of Massachusetts; Correction
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31442-31443]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15621]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 70

[AD-FRL-5522-9]

Clean Air Act Final Interim Approval of Operating Permits 
Program; Delegation of Section 112 Standards; State of Massachusetts; 
Correction

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final interim approval; Correction.

-----------------------------------------------------------------------

SUMMARY: On May 15, 1996 (61 FR 24460), EPA promulgated interim 
approval of the 40 CFR Part 70 Operating Permits Program for the 
Commonwealth of Massachusetts. The document correctly identified the 
effective date as May 15, 1996. However, the language to amend 40 CFR 
Part 70 listed an incorrect effective date and an incorrect expiration 
date for the interim approval of this program.

EFFECTIVE DATE: May 15, 1996.

FOR FURTHER INFORMATION CONTACT: Ida E. Gagnon, Air Permits Program, 
CAP, U.S. Environmental Protection Agency, Region 1, JFK Federal 
Building, Boston, MA 02203-2211, (617) 565-3500.

SUPPLEMENTARY INFORMATION: In the document published on May 15, 
1996 at 61 FR 24461, column 3, the effective date and expiration 
date were incorrect. This final rule corrects the language to amend 
40 CFR Part 70 in a manner which is consistent with the May 15, 
1996 rule. The correct effective date of this interim approval is 
May 15, 1996, and the correct expiration date of this interim 
approval is May 15, 1998.

    The EPA regrets any inconvenience the earlier information has 
caused.

List of Subjects in 40 CFR Part 70

    Administrative practice and procedure, Air pollution control, 
Environmental Protection, Intergovernmental relations, Operating 
permits, Reporting and recordkeeping requirements.

    Dated: May 30, 1996.
John P. DeVillars,
Regional Administrator, Region I.
    Part 70, title 40 of the Code of Federal Regulations is amended as 
follows:

[[Page 31443]]

PART 70--[AMENDED]

    1. The authority citation for part 70 continues to read as follows:

    Authority: 42 U.S.C. 7401, et seq.

    2. Appendix A to part 70 is amended by revising the entry for 
Massachusetts to read as follows:

Appendix A to Part 70--Approval Status of State and Local Operating 
Permits Programs

* * * * *

Massachusetts

    (a) Department of Environmental Protection: submitted on April 
28, 1995; interim approval effective on May 15, 1996; interim 
approval expires May 15, 1998.
    (b) (Reserved).
* * * * *
[FR Doc. 96-15621 Filed 6-19-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-15617 Operating Permits Program Interim Approval Criteria
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31443-31449]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15617]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 70

[FRL-5521-4]
RIN 2060-AF70

Operating Permits Program Interim Approval Criteria

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The EPA is promulgating revisions to the interim approval 
criteria within the regulations in part 70, chapter I, title 40, of the 
Code of Federal Regulations (CFR). Part 70 contains regulations 
requiring States to develop, and submit to EPA for approval, programs 
for issuing operating permits to major, and certain other, stationary 
sources of air pollution as required by title V of the Clean Air Act 
(Act). Two changes to the interim approval criteria were proposed on 
August 29, 1994 to address difficulties in program development that 
have occurred since promulgation of part 70. Today's action finalizes 
one of those changes; the other will be finalized in a subsequent 
action.
    As a result of today's revision to part 70, certain State operating 
permit programs will become eligible for interim program approval. 
Without today's changes, these programs would not have been eligible 
for interim program approval under the part 70 regulations. 
Specifically, interim approval may now be granted for programs which do 
not provide for the incorporation of terms contained in permits issued 
under EPA-approved minor source preconstruction permit programs into 
corresponding part 70 permits.
    To be eligible for this interim approval, such programs would have 
to show compelling reasons for the interim approval and meet certain 
other requirements regarding the content of part 70 permits that 
exclude these applicable preconstruction permit terms during the 2-year 
interim period. After 2 years, interim approval expires and the State 
must have revised its program to address the exclusion of these terms, 
and any other deficiencies, in order to receive full approval.

EFFECTIVE DATE: July 22, 1996.

FOR FURTHER INFORMATION CONTACT: Michael Ling (telephone number 919-
541-4729), U. S. Environmental Protection Agency, Office of Air Quality 
Planning and Standards, Information Transfer and Program Integration 
Division, Mail Drop 12, Research Triangle Park, North Carolina 27711.

SUPPLEMENTARY INFORMATION:

Regulated Entities

    Entities potentially regulated by this action are those State, 
local, or tribal governments who seek approval of their part 70 
operating permit programs, but whose programs do not include minor 
preconstruction permit terms in their part 70 permits. Regulated 
categories include:

------------------------------------------------------------------------
                                                Examples of regulated   
                 Category                             entities          
------------------------------------------------------------------------
State/Local/Tribal Government.............  Governments who have        
                                             developed operating permit 
                                             programs that exclude minor
                                             NSR terms from title V     
                                             permits and who seek EPA   
                                             approval of such programs  
                                             under the part 70          
                                             regulations.               
------------------------------------------------------------------------

This table is not intended to be exhaustive, but rather provides a 
guide for readers regarding entities likely to be regulated by this 
action. This table lists the types of entities that EPA is now aware 
could potentially be affected by this action. If you have questions 
regarding the applicability of this action to a particular entity, 
consult the person listed in the preceding FOR FURTHER INFORMATION 
CONTACT section.

Docket

    Supporting information used in developing the part 70 rules, 
including today's promulgated change, is contained in docket number A-
93-50. This docket is available for public inspection and copying 
between 8:30 a.m. and 3:30 p.m. Monday through Friday, at EPA's Air 
Docket, Room M-1500, Waterside Mall, 401 M Street SW, Washington, D.C. 
20460. A reasonable fee may be charged for copying.

I. Background and Purpose

A. Introduction

    Title V of the Clean Air Act Amendments of 1990 (1990 Amendments), 
Public Law 101-549, requires EPA to promulgate regulations establishing 
the requirements for development and submittal of State operating 
permit programs and the minimum elements these programs must contain to 
be approvable. On July 21, 1992, EPA published regulations meeting 
these requirements in the Federal Register (57 FR 32250).
    Title V and the part 70 regulations require States and local 
agencies to submit operating permit programs to EPA within 3 years of 
enactment of the 1990 Amendments, and require EPA to take action within 
1 year of program submittal to approve or disapprove these programs. 
Section 502(g) of the Act allows EPA to grant interim approval to a 
program if it ``substantially meets'' the requirements of title V but 
is not fully approvable. Interim approval may be granted for a period 
of up to 2 years and may not be renewed. The interim approval provision 
allows permitting authorities time to correct the program deficiencies 
preventing full approval. The minimum elements that a program must 
contain to be eligible for interim approval are contained in 
Sec. 70.4(d).
    The EPA proposed two changes to the interim approval criteria on 
August 29, 1994 (59 FR 44571). The first change would allow interim 
approval for part 70 programs which allow permits to be revised through 
the minor permit modification procedure to reflect those changes at a 
facility which is subject to EPA-approved minor source preconstruction 
permit requirements, commonly referred to as ``minor new source 
review'' (minor NSR) changes. Because this proposal is linked to 
proposed changes to the permit revision system, which EPA is not yet 
ready to finalize, and because current EPA policy already allows for 
approval of programs which allow changes established through minor NSR 
to be addressed using minor permit modification procedures, EPA is not 
taking final action on this proposed change in today's rulemaking.
    The second proposed change to the interim approval criteria 
addresses programs that do not incorporate terms and conditions into a 
source's part 70 permit which are established through an EPA-approved 
minor NSR program.

[[Page 31444]]

Title V and part 70 require a permit to contain provisions which assure 
compliance with all applicable requirements (section 502(b)(5)(A) of 
the Act, 40 CFR 70.6(a)). The definition of the term ``applicable 
requirement'' in part 70 includes requirements established through 
minor NSR permitting procedures (Sec. 70.2). The proposed change to 
part 70 would, for the period of interim approval, allow part 70 
permits to be issued and revised without incorporating those terms and 
conditions that are applicable requirements solely because they are 
established through minor NSR. These minor NSR terms and conditions 
would still remain federally enforceable through the provisions of the 
minor NSR program. In today's notice, EPA is taking final action on 
this proposed rule change.

B. Summary of Proposed Changes Addressing Applicable Requirements

    The August 29, 1994 proposal noted that, in order to be eligible 
for interim approval, a program must contain adequate authority to 
issue permits that assure compliance with all applicable requirements 
including all applicable requirements under title I of the Act [see 
Sec. 70.4(d)(3)(ii) and Sec. 70.4(c)(1)]. The proposal explained that 
EPA believes the term ``applicable requirements'' clearly includes all 
terms and conditions of minor NSR permits. Therefore, a part 70 program 
that would not provide for incorporating into permits those 
requirements established through the EPA-approved minor NSR program 
would be prohibited by Sec. 70.4(d)(3)(ii) from receiving interim 
approval.
    One State, Texas, argued that there are compelling reasons 
supporting its exclusion of minor NSR requirements as title V 
applicable requirements, and that its submitted part 70 program should 
thus be eligible for approval. Although EPA reads Sec. 70.2 and 
Sec. 70.6(a)(1) to unequivocally require minor NSR terms to be 
applicable requirements (meaning that the submitted Texas program could 
not obtain full approval), the Agency proposed that Texas' 
demonstration of compelling reasons warranted further consideration of 
the submitted program for interim approval on the basis that it 
substantially meets the requirements of title V. Texas' demonstration 
of compelling reasons included the following arguments: (1) Texas' 
existing minor NSR program is so stringent that the integration of all 
its minor NSR terms would be infeasible and unnecessary for 
environmental protection; (2) Texas has an exceptionally large number 
of part 70 sources which are candidates for minor NSR, making part 70 
permitting difficult and time-consuming; and (3) Texas believes that 
its system of cross-referencing minor NSR permits in part 70 permits 
will serve essentially the same program purposes as inclusion of the 
minor NSR requirements themselves, rendering direct inclusion of these 
requirements unnecessary from Texas' viewpoint.
    On the basis of this type of showing, EPA proposed to consider 
interim approval for programs facing significant minor NSR/part 70 
integration difficulties. The proposal further provided that, for a 
program operating under this type of interim approval: (1) Each part 70 
permit issued during the interim approval must (if applicable) state 
that applicable minor NSR requirements are not included; (2) each minor 
NSR permit containing requirements applicable to the source must be 
cross-referenced in the source's part 70 permit so that citizens may 
access and review those requirements; (3) excluded minor NSR 
requirements would not be eligible for the permit shield under 
Sec. 70.6(f); and (4) upon conversion to full approval, all permits 
issued during the interim approval period that excluded minor NSR terms 
would have to be reopened to include these terms.
    Although the exclusion of minor NSR means that important title V 
compliance measures (e.g., compliance certification, public review, 
etc.) will be deferred for 2 years for minor NSR terms, the proposed 
provisions would limit the scope and duration of the effects of this 
deferral, and would assure that the public could examine, in federally-
enforceable NSR permits, any terms which are not subject to title V's 
compliance measures during the interim period. This helps strengthen 
the proposal's position that programs which exclude minor NSR terms 
could ``substantially meet'' the requirements of part 70 and receive 
interim approval. However, EPA reiterates that all compliance measures 
contained in title V must be applied to all applicable requirements, 
including minor NSR terms, before a part 70 program can receive full 
approval.

II. Discussion of Today's Action

A. Summary of Changes Since Proposal

    In response to comments, EPA is making three minor rule changes to 
clarify the requirements discussed in the proposal preamble. These 
include: (1) Adding rule language clarifying that any excluded NSR 
permits must be cross-referenced in the applicable part 70 permit; (2) 
adding rule language clarifying that excluded NSR requirements would 
not be eligible for the permit shield under Sec. 70.6(f); and (3) 
adding rule language clarifying that, upon conversion to full approval, 
permits issued during the interim period would have to be revised or 
reopened to include any excluded minor NSR terms. Regarding reopening, 
today's rule also provides for a streamlined reopening process for 
excluded minor NSR terms that does not require the full permit issuance 
process. The rule provisions are also being rearranged into separate 
paragraphs in the final rule for clarity. In addition to these rule 
clarifications, the EPA also reiterates in today's preamble its 
position that minor NSR is an applicable requirement for part 70 
purposes. Additional discussion is also provided on the proposed 
``compelling reasons'' demonstration requirement being promulgated 
today.

B. Significant Comments and Responses

    The August 29, 1994 proposal concerning interim approval criteria 
was grouped with a larger proposal revising the part 70 permit revision 
system (published separately at 59 FR 44459). The EPA received a total 
of 246 comment letters on these two proposals, some of which addressed 
each action separately and some of which addressed both actions 
together. This section addresses only the major comments received on 
the proposed revision to the interim approval criteria regarding minor 
NSR as an applicable requirement. Discussion of additional issues 
raised by the commenters related to today's action is contained in the 
technical support document for this rule, which is included in the 
docket for today's rulemaking. Comments on other proposed changes to 
the interim approval criteria not addressed by today's rule change, 
including comments on other aspects of the August 1994 proposals (as 
well as the August 31, 1995 proposal which supplemented the August 1994 
notice on permit revisions), will be addressed in a future rulemaking.
1. Minor NSR as an Applicable Requirement
    Several commenters asserted that revisions to the interim approval 
criteria are unnecessary because minor NSR is not an ``applicable 
requirement'' under part 70. The EPA notes that it has the authority to 
promulgate this revision to the interim approval criteria regardless of 
the correctness of the assertion that minor NSR is not an applicable 
requirement. However, EPA also

[[Page 31445]]

disagrees with the commenters' assertion, and stands by the position 
and the rationale articulated in the proposal, that minor NSR is an 
applicable requirement. Key points of this rationale are reiterated 
below in response to comments received, and are discussed further in 
the technical support document found in the docket.
    One commenter disagreed with EPA's reading of the part 70 
definition of ``applicable requirement,'' noting that something is not 
necessarily an ``applicable requirement'' simply because it is a 
requirement of the Act. The EPA agrees with this broad statement, 
noting--for example--that requirements of title II are not ``applicable 
requirements.'' However, EPA sees no basis for concluding that minor 
NSR permits issued under a State implementation plan (SIP) approved 
program are not applicable requirements. Furthermore, as explained in 
the proposal preamble, EPA believes the part 70 rule is clear in 
defining ``applicable requirements'' to include minor NSR. A challenge 
to this point should have been raised in the context of the July 21, 
1992 promulgation of part 70.
    Another commenter argued more broadly that the intent of the Act is 
to regulate major sources while allowing States to regulate minor 
sources through minor NSR programs. The EPA disagrees. Section 
110(a)(2)(c) of the Act and EPA's regulations at 51.161 clearly 
establish Federal requirements for preconstruction review of activities 
below the NSR major source applicability thresholds. The EPA further 
disagrees with this commenter's assertion that its argument is 
supported by EPA's proposed resolution of the ``title I modifications'' 
issue. A determination by EPA that ``title I modifications'' do not 
include minor NSR actions does not mean that minor NSR programs are 
optional under the Act.
    A commenter also noted that many State minor NSR programs go beyond 
the Federal minimum, and that a detailed analysis would be necessary to 
determine the precise extent to which a minor NSR program is necessary 
to attain and maintain the national ambient air quality standards 
(NAAQS). The EPA disagrees that any such analysis is necessary or 
appropriate. A State that submitted a minor NSR program for approval 
into the SIP presumably did so because it believed that the submitted 
program was necessary to attain and maintain the NAAQS. The EPA 
believes this is the only reasonable presumption that can be made in 
retrospect.
    Although EPA reiterates that minor NSR terms are applicable 
requirements, EPA also recognizes that certain terms found in existing 
NSR permits (including minor NSR permits) may be obsolete, extraneous, 
environmentally insignificant, or otherwise not required as part of the 
SIP or a federally-enforceable NSR program. Inclusion of these terms in 
a part 70 permit could present program implementation difficulties and 
is not needed to fulfill the purposes of the Act. Noting this, EPA 
issued a policy addressing incorporation of these permit terms into 
part 70 permits. This policy is described in ``White Paper for 
Streamlined Development of Part 70 Permit Applications, July 10, 1995'' 
(White Paper). The White Paper states that, although minor NSR permit 
terms are applicable requirements, the permitting authority may use a 
joint title V/NSR ``parallel process'' to make appropriate revisions to 
an NSR permit to exclude NSR terms which are obsolete, unrelated to 
attainment and maintenance of a NAAQS, extraneous, or otherwise 
environmentally insignificant. By revising the underlying NSR permit to 
delete, revise, or designate as State-only these unnecessary minor NSR 
permit terms, the permit authority has discretion to exclude these 
terms from the set of federally-enforceable minor NSR conditions, and 
thus from the definition of ``applicable requirement'' for part 70 
purposes.
    The EPA notes that programs which exclude minor NSR as an 
applicable requirement under today's approach to interim approval, and 
which seek to streamline minor NSR permits using a White Paper 
approach, would not need to have revised existing minor NSR permits in 
this way until conversion to full approval, because these programs will 
not include minor NSR terms in part 70 permits until that time. 
However, programs considering this type of parallel processing are 
encouraged to consult the White Paper and begin this permit revision 
process, so that the task of streamlining minor NSR permits does not 
conflict with other permit authority responsibilities at the time full 
approval is received.
2. Demonstration of ``Compelling Reasons''
    The proposal allows EPA to grant interim approval to part 70 
programs that do not include minor NSR as an applicable requirement 
upon a showing by the permitting authority of ``compelling reasons'' 
which support the interim approval. One commenter stated that the 
requirement for compelling reasons is unworkable and should be deleted, 
and that EPA does not provide guidance on what constitutes compelling 
reasons. The EPA disagrees that the compelling reasons requirement 
should be deleted, and does not believe that additional guidance on 
compelling reasons is necessary for reasons explained below.
    The EPA believes it is important to include a requirement that a 
State demonstrate compelling reasons to grant interim approval if a 
part 70 program excludes minor NSR from the definition of ``applicable 
requirement.'' The EPA believes, in general, that an interim approval 
on this basis is undesirable because it delays the implementation of 
title V for a large number of Act requirements at a large number of 
sources, and is a significant departure from the part 70 regulations. 
The Agency believes that this type of departure should be made only for 
those programs that demonstrate a strong need for the interim exclusion 
of minor NSR. Therefore, the Agency is requiring that such programs 
demonstrate compelling reasons for granting the interim approval.
    Two commenters also asserted that EPA has no basis under the Act to 
require States to show compelling reasons for granting interim 
approval; EPA disagrees. Section 502(g) of the Act gives EPA broad 
discretion as to when and how it grants interim approval. This 
discretion includes requiring that a State show compelling reasons 
before making significant departures from part 70. The commenters 
presented no basis, nor does EPA see any reason, to remove the 
``compelling reasons'' requirement.
    The ``compelling reasons'' demonstration should be based primarily 
on a showing that extraordinary difficulties would be encountered in 
incorporating minor NSR terms into initial title V permits. It is also 
appropriate to include in the demonstration any measures the State is 
taking in its interim part 70 program to support the implementation of 
the excluded minor NSR program. The EPA reserves its discretion to 
evaluate demonstrations of compelling reasons on a case-by-case basis, 
with consideration given to the degree of the minor NSR/title V 
integration difficulties and the extent to which the State part 70 
program addresses minor NSR implementation in the interim. Because of 
the case-by-case nature of such decisions, EPA cannot provide 
prescriptive criteria for the compelling reasons demonstration.
    The Texas demonstration of compelling reasons, described in the 
August 1994 proposal, is an example of

[[Page 31446]]

the type of demonstration that could be considered for interim approval 
under today's rule. Texas argued that: (1) Its minor NSR program is so 
stringent that integration of all minor NSR terms would be infeasible; 
(2) it has an exceptionally large number of part 70 sources which 
receive minor NSR; and (3) its part 70 program would cross-reference 
minor NSR permits in part 70 permits (i.e., identifies in each part 70 
permit the applicable minor NSR permits, but does not incorporate by 
reference the requirements of minor NSR into the part 70 permit).
    Although EPA does not believe that the existence of a stringent 
minor NSR program justifies exclusion of minor NSR from a title V 
program, the Agency acknowledges that a program such as Texas' does 
produce an extremely large number of minor NSR permits, because of both 
its inclusive applicability provisions and because of the large number 
of facilities statewide. Thus, integration of minor NSR permits into 
initial title V permits presents significant difficulty in Texas. 
Similarly, although EPA does not believe that simply cross-referencing 
minor NSR permits satisfies title V, EPA acknowledges that the cross-
referencing requirement in Texas' part 70 program serves to provide 
additional notice in part 70 permits when minor NSR applies to a 
facility. Although this measure falls short of the permit content 
requirements of a fully-approvable title V program, EPA believes it is 
appropriate for a State to reference such measures in its compelling 
reasons demonstration. Therefore, because of the combination of 
integration difficulties and program measures, EPA would consider such 
a program for interim approval. The EPA notes that today's notice is 
not intended to present the Agency's position as to whether Texas' 
compelling reasons demonstration (together with the rest of its 
program) warrants interim approval under the revised criteria. Rather, 
today's rule simply provides for the possibility that such a program 
could be considered for interim approval in light of the fact that it 
excludes minor NSR terms from part 70 permits.
    In addition to requiring a showing of compelling reasons, the 
proposal preamble noted that EPA will consider the following as factors 
against this type of interim approval: (1) Whether a program's 
exclusion of minor NSR terms will diminish the effectiveness of the 
State's minor NSR program during the interim period; and (2) whether 
the State has already submitted a part 70 program that included minor 
NSR as an applicable requirement. It is recommended that States 
considering excluding minor NSR as an applicable requirement carefully 
consider whether, in light of these factors, its reasons for the 
exclusion truly constitute a compelling need. Such States should also 
consider whether the time delays in program approval associated with 
necessary program changes and the development of a case-by-case 
analysis of compelling reasons are worth the interim relief that may be 
achieved through the temporary exclusion of minor NSR from title V 
permitting.
3. Incorporation of Minor NSR on Transition to Full Approval
    The proposal preamble noted that a part 70 program which does not 
incorporate minor NSR as an applicable requirement must, upon 
conversion from interim to full approval, provide for the reopening of 
permits issued during the interim period in order to include the 
excluded minor NSR requirements in each part 70 permit. Three 
commenters stated that such a reopening would be unnecessary and 
impractical. The commenters were concerned about the timing and impact 
of the resource burden imposed on sources and on permitting authorities 
by the reopening process, which, in accordance with Sec. 70.7(f)(2), 
must follow the same procedural requirements as permit issuance. They 
felt that reopening was an unnecessary procedural burden with little 
environmental benefit and believed that minor NSR terms could be 
included at renewal, rather than reopening, with little adverse impact.
    While EPA is sensitive to resource concerns, the Agency does not 
agree that these concerns should result in exclusion of minor NSR terms 
from title V permits until renewal. The EPA, in proposing to allow this 
type of interim approval, did not contemplate that minor NSR applicable 
requirements could be excluded until renewal, which could be up to 5 
years after full program approval. Furthermore, part of the rationale 
for granting interim approval is that the excluded minor NSR terms are 
subject to other safeguards in the part 70 regulations. One such 
safeguard is the reopening of permits when interim approval expires to 
incorporate excluded applicable requirements. Without such a safeguard, 
minor NSR terms would not be subject to key provisions of title V, such 
as annual compliance certification, recordkeeping and reporting, and 
other similar requirements, for up to 5 years.
    The EPA does agree that, if reopenings to incorporate excluded 
minor NSR permits must follow the same procedural requirements as full 
permit issuance, the process of reopening each permit issued during the 
interim approval period could impose considerable administrative burden 
at a time when the permitting authority is still also processing 
initial permit applications. This burden is greatly mitigated in Texas 
where the earliest permits, and hence the ones requiring reopening, are 
for the simplest sources and source categories. The EPA believes that 
remaining concerns over the resource burden associated with reopenings 
will be reasonably addressed by the provisions discussed below.
    The EPA reiterates that any permit issued during the interim period 
must, upon transition to full approval, assure compliance with the 
permit content requirements of title V (i.e., Secs. 70.6 (a) and (c)) 
for all applicable requirements, including the previously excluded 
minor NSR terms. However, the Act does not specifically require a full 
reopening when interim approval expires as the only means to achieve 
this end. The EPA believes that excluded minor NSR applicable 
requirements may be brought on to the title V permit prior to or upon 
full program approval using procedures more streamlined than full 
reopening. This is because some of the excluded minor NSR requirements 
have already been subjected to some title V procedural requirements 
(e.g., public review) during issuance of the NSR permit. The EPA 
recognizes that under this approach, other excluded minor NSR terms 
will be incorporated into part 70 permits without an opportunity for 
public comment, EPA objection, or citizen petition until renewal. 
However, EPA believes that deferral of these title V requirements until 
renewal is appropriate for excluded minor NSR applicable requirements. 
A minor NSR permit that is newly issued during the permit term would be 
incorporated into the permit through procedures that are less than 
those required for permit issuance. The EPA believes it is reasonable 
to allow for equitable treatment of pre-existing minor NSR permits that 
were initially excluded from the permit in the same manner, 
particularly since the permit shield will not apply until the minor NSR 
permit undergoes full title V procedures at renewal.
    The EPA is adding language at Sec. 70.3(d)(3)(ii)(D) allowing this 
streamlined reopening approach for excluded minor NSR terms. The EPA 
notes that any such process should at least meet the part 70 permit 
revision requirements for changes subject to minor NSR. This would 
include any

[[Page 31447]]

minimum requirements for public notice and access to records contained 
in the part 70 regulations in effect at the time of program transition 
to full approval. The EPA is further allowing permitting authorities to 
dispense with the need to give each source a 30-day notice of its 
intent to revise the permit to incorporate previously-excluded minor 
NSR permits. The EPA believes this individual notice is unnecessary 
because sources, by virtue of this action and actions taken by the 
State to implement this approach, will have ample notice of the fact 
that permits excluding minor NSR permits will need to be reopened.
    As an alternative to the streamlined reopening described above, EPA 
believes that an interim program that does not include minor NSR terms 
in title V permits can be designed in such a way that it provides in 
advance for the inclusion of minor NSR terms upon transition to full 
approval. This can be accomplished by providing that each part 70 
permit issued during the interim period contains a condition that 
automatically incorporates, at the date of transition to full approval, 
the terms and conditions of any minor NSR permits referenced in the 
facility's title V permit. This would not simply be cross-referencing, 
but would be advance incorporation of the NSR requirements by 
reference, which would subject them to title V requirements such as the 
requirement for an annual compliance certification. This approach would 
provide in advance for a streamlined transition to full approval 
without any need for reopening.
    The EPA believes that the allowance for more streamlined procedures 
for incorporating excluded applicable requirements, together with the 
advance incorporation approach described above, provide less burdensome 
alternatives to full reopening. Interim programs that exclude minor NSR 
are encouraged to adopt one, or a combination, of these streamlined 
approaches to assure that title V is met for excluded minor NSR terms 
prior to or upon conversion to full approval, thus avoiding the need 
for full reopening. However, EPA notes that, in the absence of any 
other assurance that Secs. 70.6 (a) and (c) are met for any applicable 
requirements, including minor NSR terms, the reopening provisions under 
Secs. 70.7 (f) and (g), including full issuance process, would apply if 
and when EPA grants full approval, as noted in the preamble to the 
proposal.
4. Cross-Referencing of Minor NSR Permits Under Interim Program
    The preamble to the proposed revision provided that each part 70 
permit issued by an interim program that does not include minor NSR as 
an applicable requirement must state that applicable minor NSR 
requirements are not included in the permit, and must cross-reference 
any excluded minor NSR permits so that citizens may access and review 
those permits. One commenter noted that, while the preamble asserts 
that such cross-referencing is required, the corresponding rule 
language is ambiguous with respect to this requirement. Another 
commenter felt that if EPA does require such cross-referencing, 
specific criteria regarding what constitutes adequate cross-referencing 
should also be provided.
    The EPA agrees that there is a need to clarify the rule language 
regarding cross-referencing. Therefore, EPA is adding a sentence to the 
proposed rule language in Sec. 70.4(d)(3)(ii) to clarify that a 
facility's part 70 permit must contain a list of all minor NSR permits 
that contain excluded applicable requirements for that facility. Most 
States have a numbering system for minor NSR permits, so a listing in 
the part 70 permit of the permit numbers for each minor NSR permit 
applicable to that facility would fulfill the cross-referencing 
requirement.
    For similar reasons, EPA is adding language clarifying the proposal 
preamble discussion of the permit shield. The preamble stated that the 
permit shield would not apply to the excluded minor NSR terms. Rule 
language is being added to codify this requirement in parallel with the 
other requirements for the interim program.

III. Administrative Requirements

A. Docket

    The docket for this regulatory action is number A-93-50. All the 
documents referenced in this preamble fall into one of two categories. 
They are either reference materials that are considered to be generally 
available to the public, or they are memoranda and reports prepared 
specifically for this rulemaking. Both types of documents can be found 
in docket number A-93-50.

B. Executive Order (E.O.) 12866

    Under E.O. 12866 (58 FR 51735, October 4, 1993), the Agency must 
determine whether each regulatory action is ``significant,'' and 
therefore subject to the Office of Management and Budget (OMB) review 
and the requirements of the Order. The Order defines ``significant'' 
regulatory action as one that is likely to lead to a rule that may:
    (1) Have an annual effect on the economy of $100 million or more, 
adversely and materially affecting a sector of the economy, 
productivity, competition, jobs, the environment, public health or 
safety, or State, local, or tribal governments or communities.
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency.
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan program or the rights and obligation of recipients 
thereof.
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
E.O. 12866.
    Pursuant to the terms of E.O. 12866, it has been determined that 
this rule is not a ``significant'' regulatory action because it does 
not substantially change the existing part 70 requirements for States 
or sources--requirements which have already undergone OMB review. 
Rather than impose any new requirements, this rule removes an 
obstruction to part 70 program approval for a small number of State 
programs, allowing them to implement their own part 70 programs. In the 
absence of today's rule, EPA would implement its part 71 program in 
such States, which, as noted in the Information Collection Request 
(ICR) for the part 71 rule, would be more burdensome in a given State 
than a part 70 program for both the sources and the applicable 
permitting authority. Thus, not only does the rule avoid new direct 
costs, it leads indirectly to a savings. As such, this action was 
exempted from OMB review.

C. Regulatory Flexibility Act Compliance

    Under the Regulatory Flexibility Act, whenever an Agency publishes 
any proposed or final rule in the Federal Register, it must prepare a 
Regulatory Flexibility Analysis (RFA) that describes the impact of the 
rule on small entities (i.e., small businesses, organizations, and 
governmental jurisdictions). The EPA has established guidelines which 
require an RFA if the proposed rule will have any economic impact, 
however small, on any small entities that are subject to the rule, even 
though the Agency may not be legally required to develop such an 
analysis.
    The original part 70 rule was determined to not have a significant 
and disproportionate adverse impact on small entities. Similarly, a 
regulatory flexibility screening analysis of the

[[Page 31448]]

impacts of the proposed part 70 revisions determined that the proposed 
revisions (a subset of which constitutes today's action) would likewise 
not have a significant and disproportionate adverse impact on small 
entities. Consequently, the Administrator certified that the part 70 
regulations would not have a significant and disproportionate impact on 
small entities. Because today's rule does not substantially alter the 
part 70 regulations as they pertain to small entities, and does not 
necessitate changes to the part 70 RFA, these changes to part 70 will 
not have a significant and disproportionate impact on small entities, 
and a new RFA is not needed for this action.

D. Submission to Congress and the General Accounting Office

    Under section 801(a)(1)(A) of the Administrative Procedures Act 
(APA) as amended by the Small Business Regulatory Enforcement Fairness 
Act of 1996, EPA submitted a report containing this rule and other 
required information to the U.S. Senate, the U.S. House of 
Representatives and the Comptroller General of the General Accounting 
Office prior to publication of the rule in today's Federal Register. 
This rule is not a ``major rule'' as defined by section 804(2) of the 
APA as amended.

E. Paperwork Reduction Act

    The OMB has approved the information collection requirements 
contained in this rule under the provisions of the Paperwork Reduction 
Act, 44 U.S.C. 3501 et seq. and has assigned OMB control number 2060-
0243. The ICR prepared for the part 70 rule is not affected by today's 
action because the part 70 ICR determined burden on a nationwide basis, 
assuming all part 70 sources were included without regard to the 
approval status of individual programs. Today's rule, which simply 
provides for the interim approval of certain programs which would have 
otherwise not been eligible for such approval, does not alter the 
assumptions of the approved part 70 ICR used in determining the burden 
estimate. Furthermore, today's action does not impose any additional 
requirements which would add to the information collection requirements 
for sources or permitting authorities.
    Send comments on the Agency's need for this information, the 
accuracy of the provided burden estimates, and any suggested methods 
for minimizing respondent burden, including through the use of 
automated collection techniques, to:

Director, Regulatory Information Division, Office of Policy, Planning, 
and Evaluation (2136), U.S. Environmental Protection Agency, 401 M 
Street, SW., Washington, DC 20460

      and

Office of Information and Regulatory Affairs, Office of Management and 
Budget, Attention: Desk Officer for EPA, 725 17th Street, NW., 
Washington, DC 20503.

    Include the ICR number in any correspondence.

F. Unfunded Mandates Reform Act

    Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), P.L. 
104-4, establishes requirements for Federal agencies to assess the 
effects of their regulatory actions on State, local, and tribal 
governments and the private sector. Under section 202 of the UMRA, EPA 
generally must prepare a written statement, including a cost-benefit 
analysis, for proposed and final rules with Federal mandates that may 
result in expenditures to State, local, and tribal governments, in the 
aggregate, or to the private sector, of $100 million or more in any 1 
year.
    The EPA has determined that today's rule does not contain a Federal 
mandate that may result in expenditures of $100 million or more for 
State, local, and tribal governments, in the aggregate, or the private 
sector, in any 1 year. Although the part 70 regulations governing State 
operating permit programs impose significant Federal mandates, today's 
action does not amend the part 70 regulations in a way that 
significantly alters the expenditures resulting from these mandates. 
Therefore, the Agency concludes that it is not required by section 202 
of the UMRA of 1995 to provide a written statement to accompany this 
regulatory action.

List of Subjects in 40 CFR Part 70

    Environmental protection, Air pollution control, Carbon monoxide, 
Fugitive emissions, Hydrocarbons, Lead, New source review, Nitrogen 
dioxide, Operating permits, Particulate matter, Prevention of 
significant deterioration, Volatile organic.

    Dated: June 11, 1996.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, 40 CFR part 70 is amended 
as follows.

PART 70--[AMENDED]

    1. The authority citation for part 70 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

    2. Section 70.4 is amended by revising paragraphs (d)(3) 
introductory text and (d)(3)(ii) to read as follows:

Sec. 70.4  State program submittals and transition.

* * * * *
    (d) * * *
    (3) The EPA may grant interim approval to any program if it meets 
each of the following minimum requirements and otherwise substantially 
meets the requirements of this part:
* * * * *
    (ii) Applicable requirements.
    (A) The program must provide for adequate authority to issue 
permits that assure compliance with the requirements of paragraph 
(c)(1) of this section for those major sources covered by the program.
    (B) Notwithstanding paragraph (d)(3)(ii)(A) of this section, where 
a State or local permitting authority lacks adequate authority to issue 
or revise permits that assure compliance with applicable requirements 
established exclusively through an EPA-approved minor NSR program, EPA 
may grant interim approval to the program upon a showing by the 
permitting authority of compelling reasons which support the interim 
approval.
    (C) Any part 70 permit issued during an interim approval granted 
under paragraph (d)(3)(ii)(B) of this section that does not incorporate 
minor NSR requirements shall:
    (1) Note this fact in the permit;
    (2) Indicate how citizens may obtain access to excluded minor NSR 
permits;
    (3) Provide a cross reference, such as a listing of the permit 
number, for each minor NSR permit containing an excluded minor NSR 
term; and
    (4) State that the minor NSR requirements which are excluded are 
not eligible for the permit shield under Sec. 70.6(f).
    (D) A program receiving interim approval for the reason specified 
in (d)(3)(ii)(B) of this section must, upon or before granting of full 
approval, institute proceedings to reopen part 70 permits to 
incorporate excluded minor NSR permits as terms of the part 70 permits, 
as required by Sec. 70.7(f)(1)(iv). Such reopening need not follow full 
permit issuance procedures nor the notice requirement of 
Sec. 70.7(f)(3), but may instead follow the permit revision procedure 
in effect under the State's

[[Page 31449]]

approved part 70 program for incorporation of minor NSR permits.
* * * * *
[FR Doc. 96-15617 Filed 6-19-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-15616 National Emission Standards for Hazardous Air Pollutants for Source Categories: Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry and Other Processes Subject to the Negotiated Regulation for Equipment Leaks; Clarifications
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31435-31442]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15616]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 63

[AD-FRL-5521-7]
RIN 2060-AC19

National Emission Standards for Hazardous Air Pollutants for 
Source Categories: Organic Hazardous Air Pollutants From the Synthetic 
Organic Chemical Manufacturing Industry and Other Processes Subject to 
the Negotiated Regulation for Equipment Leaks; Clarifications

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule: Amendments.

-----------------------------------------------------------------------

SUMMARY: On April 10, 1995, the EPA proposed amendments to certain 
portions of the ``National Emission Standards for Hazardous Air 
Pollutants from the Synthetic Organic Chemical Manufacturing Industry 
and Other Processes Subject to the Negotiated Regulation for Equipment 
Leaks'' (collectively known as the ``hazardous organic NESHAP'' or the 
``HON''). This action announces the EPA's final decisions on those 
proposed amendments.
    The rule is being revised to remove three compounds (glycerol tri-
(polyoxypropylene)ether, polyethylene glycol, and polypropylene glycol) 
from the list of chemical production processes regulated by the HON. 
The production of these compounds is also included in the source 
category ``Polyether Polyols Production'' and will be regulated by that 
national emission standards for hazardous air pollutants (NESHAP). The 
equipment leak requirements in the rule are also being revised to 
clarify the intent of certain provisions, to correct oversights, and to 
simplify demonstration of compliance with the regulation. These changes 
are being made to ensure that the rule is implemented as intended.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Dr. Janet S. Meyer, Coatings and 
Consumer Products Group, Emission Standards Division (MD-13), U.S. 
Environmental Protection Agency, Research Triangle Park, North Carolina 
27711, telephone number (919) 541-5254.

SUPPLEMENTARY INFORMATION:

I. Regulated Entities and Background Information

    The regulated category and entities affected by this action 
include:

[[Page 31436]]

------------------------------------------------------------------------
        Category                  Examples of regulated entities        
------------------------------------------------------------------------
Industry................  Synthetic organic chemical manufacturing      
                           industry (SOCMI) units--e.g., producers of   
                           benzene, toluene, or any other chemical      
                           listed in Table 1 of 40 CFR Part 63, subpart 
                           F.                                           
                          Styrene-butadiene rubber producers.           
                          Polybutadiene rubber production.              
                          Producers of Captafol;              
                           Captan; Chlorothalonil; Dacthal;   
                           and TordonTM acid.                           
                          Producers of Hypalon;               
                           Oxybisphenoxarsine/1,3-diisocyanate          
                           (OBPA); Polycarbonates; Polysulfide
                           rubber; Chlorinated paraffins; and           
                           Symmetrical tetrachloropyridine.             
                          Pharmaceutical producers.                     
                          Producers of Methylmethacrylate-butadiene-    
                           styrene resins (MBS); Butadiene-furfural     
                           cotrimer; Methylmethacrylate-acrylonitrile-  
                           butadiene-styrene (MABS) resins; and         
                           Ethylidene norbornene.                       
------------------------------------------------------------------------

    This table is not intended to be exhaustive, but rather provides a 
guide for readers regarding entities likely to be interested in the 
revisions to the regulation affected by this action. Entities 
potentially regulated by the HON are those which produce as primary 
intended products any of the chemicals listed in Table 1 of 40 CFR Part 
63, subpart F and are located at facilities that are major sources as 
defined in Section 112 of the Clean Air Act (CAA). Processes subject to 
the negotiated regulation for equipment leaks are also potentially 
affected by this action. Processes subject to 40 CFR Part 63, subpart I 
are producers of any of the products listed in 40 CFR Part 63, subpart 
I that are located at facilities that are major sources as defined by 
Section 112 of the CAA. To determine whether your facility is regulated 
by this action, you should carefully examine all of the applicability 
criteria in 40 CFR Sec. 63.100 and 40 CFR Sec. 63.190. If you have 
questions regarding the applicability of this action to a particular 
entity, consult the person listed in the preceding FOR FURTHER 
INFORMATION CONTACT section.
    On April 22, 1994 (59 FR 19402), and June 6, 1994 (59 FR 29196), 
the EPA promulgated in the Federal Register the NESHAP for the SOCMI, 
and for several other processes subject to the equipment leaks portion 
of the rule. These regulations were promulgated as subparts F, G, H, 
and I in 40 CFR Part 63, and are commonly referred to as the hazardous 
organic NESHAP, or the HON. Since the April 22, 1994 notice, there have 
been several amendments to clarify various aspects of the rule. Readers 
should see the following Federal Register notices for more information: 
September 20, 1994 (59 FR 48175); October 24, 1994 (59 FR 53359); 
October 28, 1994 (59 FR 54131); January 27, 1995 (60 FR 5321); April 
10, 1995 (60 FR 18020); April 10, 1995 (60 FR 18026); December 12, 1995 
(60 FR 63624); and February 29, 1996 (61 FR 7716).
    On April 10, 1995 (60 FR 18071-18078), the EPA also proposed to 
remove three compounds from the list of chemical production processes 
regulated by the rule as well as proposed clarifying changes and 
corrections to certain provisions in subparts H and I. This action 
announces the EPA's final decisions on those proposed amendments.

II. Public Comment on the April 10, 1995 Proposal

    Nine comment letters were received on the April 10, 1995 notice of 
proposed changes to the rule. All comment letters received were from 
industry representatives, and were supportive of the proposed changes 
to subparts H and I. A few comment letters also included 
recommendations for further clarification of some of the proposed 
amendments or expansion of compliance options. The EPA considered these 
suggestions and, where appropriate, made changes to the proposed 
amendments. The significant issues raised and the changes to the 
proposed amendments are summarized in this preamble. A memorandum 
containing the EPA's responses to all comments can be found in Docket 
A-90-20, subcategory VI-B. The response to comments may also be 
obtained from the EPA's Technology Transfer Network (TTN), a network of 
electronic bulletin boards developed and operated by the Office of Air 
Quality Planning and Standards. The service is free, except for the 
cost of a phone call. Dial (919) 541-5742 for up to a 14,400 bits per 
second modem. Select TTN Bulletin Board: Clean Air Act Amendments and 
select menu item Recently Signed Rules. If more information on TTN is 
needed, contact the systems operator at (919) 541-5384.

III. Summary of Amendments to Rule

A. Removal of Polyols From Table 1 of Subpart F

    The EPA is removing three chemicals--glycerol tri-
(polyoxypropylene)ether, polyethylene glycol, and polypropylene 
glycol--from the list of SOCMI chemicals, located in Table 1 of 40 CFR 
Part 63, subpart F. These production processes will be addressed under 
the NESHAP for the polyether polyols production source category.

B. Changes to Subpart H

1. Consolidation of Equipment Leak Programs
    The EPA is amending subpart H by adding a new paragraph 
Sec. 63.160(c), which will allow an owner or operator to elect to 
comply with subpart H for all volatile organic compounds (VOC) 
containing process equipment in the process unit in lieu of compliance 
with other Federal equipment leak regulations. This option is available 
for equipment subject to 40 CFR Part 60 subparts VV, GGG, or KKK, to 40 
CFR Part 61 subparts F or J, or to 40 CFR Part 264 subpart BB or Part 
265 subpart BB.
2. Sampling Connection Systems
    Section 63.166 is amended to allow treatment of collected purge 
material: (1) At permitted treatment, storage, or disposal facilities 
(TSDF); (2) at solid waste treatment facilities; or (3) using waste 
management units complying with Secs. 63.133 through 63.138 of subpart 
G of Part 63 when the purge material contains any of the chemicals 
listed in Table 9 of 40 CFR Part 63, subpart G. The final Sec. 63.166 
also clarifies that if the purge material does not contain any of the 
compounds listed in Table 9 of subpart G, then the owner or operator 
may use any waste management unit regardless of whether the unit is in 
compliance with the requirements of Secs. 63.133 through 63.138 as long 
as the facility has a national pollution discharge elimination system 
(NPDES) permit or sends the wastewater to a NPDES permitted facility. 
The EPA is also adding to Sec. 63.161 a definition for the term 
``sampling connection system.''
3. Less Frequent Monitoring of Valves in Phase III
    The proposed provisions to allow use of data collected before April 
22, 1994 are being added to Sec. 63.168 and Sec. 63.174. The final 
amendments also

[[Page 31437]]

add a new paragraph Sec. 63.180(b)(6) that allows use of data collected 
before April 22, 1994 and clarifies that this data may have minor 
deviations from the requirements in Sec. 63.180 (b)(1) through (b)(5). 
The conditions for allowance of data that do not meet the criteria of 
Sec. 63.180 (b)(1) through (b)(5) are specified in Sec. 63.180 
(b)(6)(i) and (b)(6)(ii).
4. Flow Indicators
    The EPA is amending subpart H by adding a definition for ``flow 
indicator'' and by revising paragraph (j)(1) of Sec. 63.172. These 
revisions expand the definition of flow indicator to include reference 
to devices that do not measure flow and remove the reference to the 
presence of flow from the by-pass monitoring requirement.
5. Safety Issues With Sec. 63.163 and Sec. 63.167
    The proposed exemptions are being added to the final rule without 
change. Pumps in unsafe locations will be exempt from routine 
monitoring requirements, but are required to be monitored during safe-
to-monitor periods. Pumps that are unsafe-to-monitor are pumps that are 
located in an area that presents an imminent danger to personnel due to 
the presence of toxic materials, explosive process conditions, or high 
pressure. Open-ended lines or valves containing materials that 
represented a safety or explosion hazard are exempt from the 
requirement to equip the line with a cap or plug.
6. Inaccessible and Difficult-to-Monitor Agitators
    Provisions are being added to subpart H to exempt inaccessible and 
unsafe-to-monitor agitators from monitoring requirements and to provide 
consideration for difficult-to-monitor agitators. Recordkeeping 
requirements for difficult-to-monitor and unsafe-to-monitor equipment 
are added to Sec. 63.181(b)(7).
7. Porcelain Connectors
    Section 63.174(h)(1) is revised to refer to the more generic 
terminology ``ceramic or ceramic-lined'' connectors instead of glass or 
glass-lined connectors.
8. Pressure Test for Batch Process Equipment
    The EPA is revising Sec. 63.180(f)(1) to allow pressurization of 
equipment to less than the set pressure of any pressure relief device 
or to within the safety limits of the operating equipment. The EPA is 
also adding provisions to Sec. 63.180(f)(4) to allow alternative 
procedures for cases where a pressure gauge with a precision of 
 2.5 milimeters mercury in the range of the test pressure 
is not reasonably available. For those cases, the new provision in 
Sec. 63.180 (f)(4) allows the use of a pressure gauge with a precision 
of  10 percent of the test pressure and extends the 
duration of the test for the time necessary to detect a pressure loss 
(or rise) that equals a rate of one pressure per square inch gauge per 
hour (psig/hr).
9. Clarification of Calibration Requirements for Instrument Monitoring
    Several editorial revisions were proposed to clarify the instrument 
calibration requirements specified in Secs. 63.180 (b)(2) and 
(b)(4)(iii). In addition to the proposed changes, these revisions also 
clarify that an owner or operator need only calibrate those instrument 
scales that will be used in the monitoring.

C. Changes to Subpart I

1. Notification and Compliance Dates for Process Changes
    The EPA is amending subpart I to specify procedures to establish 
compliance dates for additions of equipment to units subject to subpart 
I as well as to specify compliance dates for process units or equipment 
affected by operational changes. These provisions are being added as 
Secs. 63.190 (g)(3), (g)(4), and (j).
2. Definitions
    The EPA is adding definitions for the terms ``process unit'', 
``source'', and ``bench-scale batch process.'' The definition for 
``pharmaceutical production process'' is revised to clarify that 
solvent recovery operations and waste treatment operations are not 
subject to the provisions of subpart I.
    The EPA is also adding a new provision to Sec. 63.192, as paragraph 
(a)(2), to allow owners or operators of pharmaceutical production 
processes the option to designate all equipment in a building or 
structure as a process unit or to designate all equipment at the source 
as the process unit. The owner or operator may still define a process 
unit as the equipment used to produce a specific set of pharmaceutical 
intermediate or final products.
3. Bench-Scale Batch Process Equipment
    The EPA is revising Sec. 63.190(f) of subpart I to clarify that 
bench-scale batch processes are not subject to the provisions of 
subparts I or H. This exemption is also being added to subpart H in 
Sec. 63.160 (f).

III. Summary of Major Comments and Changes to the Proposed 
Amendments

A. Consolidation of Equipment Leak Programs

    One commenter suggested that the EPA allow consolidation of 
equipment leak programs promulgated under the Resource Conservation and 
Recovery Act (RCRA) air standards (40 CFR Part 264 subparts AA, BB, and 
CC and 40 CFR Part 265 subparts AA, BB, and CC) with the equipment leak 
programs required under the CAA in addition to Part 60, subparts VV, 
GGG, and KKK, and Part 61 subparts F and J as proposed. The commenter 
stated that at their facilities the same personnel conduct the leak 
detection and repair programs, regardless of whether the program is 
required by RCRA or the CAA. Consolidating those regulatory programs 
would reduce the compliance burden without reducing protection of the 
environment.
    The EPA revised proposed Sec. 63.160 (c) to allow an owner or 
operator to elect to comply with subpart H for all VOC containing 
equipment in lieu of compliance with 40 CFR Part 264 subpart BB or 40 
CFR Part 265 subpart BB in addition to the proposed subparts in Parts 
60 and 61. The RCRA equipment leak standards were based on the 
equipment leak standards developed under Sections 111 and 112 of the 
CAA. The two RCRA equipment leak standards were drafted to incorporate 
the provisions in 40 CFR Part 60 subpart VV. This was done to eliminate 
cross-referencing and to consolidate the RCRA requirements in Parts 264 
and 265. Thus, there is no substantive difference between the RCRA and 
CAA equipment leak standards, and allowing compliance with subpart H 
reduces burden and complexity without reducing environmental 
protection.

B. Sampling Connection Systems

    Two commenters suggested clarification of the proposed provisions 
to expand the compliance options for sampling connection systems. One 
commenter requested clarification of whether purged material had to be 
sent directly to a treatment facility or if temporary storage at an 
accumulation site subject to 40 CFR Part 262 would be permissible. 
Another commenter was concerned that purges of certain materials would 
have to be treated as if they were process wastewater, yet if these 
purges were evaluated as process wastewater there would be no 
requirement to control them. This

[[Page 31438]]

commenter noted that requiring control of materials not regulated in 
the wastewater provisions appears to go beyond the intent of the rule.
    The EPA revised the wording in Sec. 63.166 (b)(4) to clarify that 
material may be stored before it is transferred to a permitted TSDF. 
The EPA agrees that, as drafted, the proposed language could have been 
misconstrued to forbid temporary storage of the purged material. The 
EPA also agrees with the second commenter's concern that, for some 
chemicals, it is not appropriate to require that the purged material be 
managed in waste management units subject to the requirements in 
Secs. 63.133 through 63.138. The provisions in Sec. 63.166(b)(4)(i) 
were revised to clarify that purge materials that do not contain any of 
the chemicals listed in Table 9 of subpart G are not required to be 
managed and treated in units in compliance with Secs. 63.133 through 
63.138 as long as the facility has an NPDES permit or sends the 
wastewater to an NPDES permitted facility. The requirement that the 
wastewater go to an NPDES permitted facility is being imposed to ensure 
that this provision does not result in increased pollution in another 
media and is therefore consistent with the requirement of Section 
112(d)(2) that standards be set taking nonair quality effects into 
account.

C. Process Unit Definition for Subpart I

    One commenter expressed concerns with the proposed definition of 
the term ``process unit'' as applied to pharmaceutical processes 
subject to subpart I. The commenter stated that the concept of process 
unit is not particularly appropriate for the pharmaceutical industry 
because most pharmaceutical operations do not fit the conceptual 
design. This commenter identified three areas where the concept was 
unclear and presented implementation problems. The first source of 
ambiguity cited by the commenter was that the term ``process unit'' is 
defined as a fixed set of equipment used to manufacture a product. The 
commenter noted that a flexible pharmaceutical operation may produce 
numerous products in a year and that the boundaries of the process unit 
could vary from week to week depending on what product is being made. 
The commenter suggested that the EPA address this problem by revising 
the definition of pharmaceutical process unit to be a set of equipment 
that manufactures one or more pharmaceutical intermediates or final 
products. The second ambiguity noted by the commenter was that 
equipment in pharmaceutical production may not be connected by pipes or 
ducts; materials may be transferred in closed containers. The commenter 
suggested that the EPA revise the definition of process unit to include 
all equipment collocated in the same building or structure, regardless 
of whether the equipment is connected by pipes or ducts. The third 
ambiguity cited by the commenter occurs in application of the proposed 
definition of ``process unit'' to a plant site with several buildings 
all served by a single solvent storage facility. The commenter 
questioned whether multiple process units served by a common solvent 
distribution system would be considered to be a single process unit. 
The commenter requested that the EPA clarify the relationship between 
the solvent distribution system and the process unit.
    Since publication of the April 10, 1995 proposal, the EPA has 
received additional information, through the public comment process, on 
the diversity of operations and equipment used in pharmaceutical 
production. Considering this information, the EPA believes that 
additional options for definition of a process unit are necessary to 
permit efficient management of equipment leak programs at 
pharamceutical processes and to reflect actual design of facilities. 
Therefore, several changes were made to the proposed provisions. First, 
the definition of ``process unit'' was revised to eliminate the 
reference to pipes and ducts as the means for connecting equipment. 
Second, a new provision was added to Sec. 63.192 (as paragraph (a)(2)) 
that will allow an owner or operator of a pharmaceutical production 
process several alternatives for defining a process unit for purposes 
of compliance with subpart I. The new provisions allow a pharmaceutical 
production process owner or operator to define the process unit as the 
equipment dedicated to the production of one or more products, as all 
operations located within a building or structure, or as all operations 
within a source. This change does not revise any control requirements 
for pharmaceutical processes. This change will provide the flexibility 
necessary for development of workable equipment leak programs for 
pharmaceutical processes. Third, the definition for pharmaceutical 
production process was revised to clarify that the process may make one 
or more pharmaceutical intermediate or final products. This additional 
flexibility was limited to pharmaceutical processes because that was 
the only category where the EPA has information that indicates this 
flexibility is necessary.

V. Administrative Requirements

A. Paperwork Reduction Act

    The information collection requirements of the previously 
promulgated NESHAP were submitted to and approved by the Office of 
Management and Budget (OMB). A copy of this Information Collection 
Request (ICR) document (OMB control number 1414.02) may be obtained 
from Sandy Farmer, Information Policy Branch (2136); U.S. Environmental 
Protection Agency; 401 M Street, SW; Washington, DC 20460 or by calling 
(202) 260-2740.
    Today's changes to the NESHAP should have no impact on the 
information collection burden estimates made previously. The changes 
consist of new definitions, alternative test procedures, and 
clarifications of requirements; not additional requirements. 
Consequently, the ICR has not been revised.

B. Executive Order 12866 Review

    Under Executive Order 12866, the EPA must determine whether the 
proposed regulatory action is ``not significant'' and therefore, 
subject to the OMB review and the requirements of the Executive Order. 
The Order defines ``significant'' regulatory action as one that is 
likely to lead to a rule that may:
    (1) Have an annual effect on the economy of $100 million or more or 
adversely affect in a material way the economy, a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety in State, local, or tribal governments or communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan programs, or the rights and obligations of 
recipients thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    The HON rule promulgated on April 22, 1994 was considered 
``significant'' under Executive Order 12866 and a regulatory impact 
analysis (RIA) was prepared. The amendments issued today clarify the 
rule and do not add any additional control requirements. Therefore, 
this regulatory action is considered not significant.

C. Regulatory Flexibility Act

    Consistent with the Regulatory Flexibility Act of 1980, EPA 
considers

[[Page 31439]]

the potentially adverse impacts of its regulations upon small business 
entities. Because this rulemaking imposes no adverse economic impacts, 
a regulatory flexibility analysis has not been prepared.

D. Submission to Congress and the General Accounting Office

    Under section 801(a)(1)(A) of the Administrative Procedures Act 
(APA) as amended by the Small Business Regulatory Enforcement Fairness 
Act of 1996, EPA submitted a report containing this rule and other 
required information to the U.S. Senate, the U.S. House of 
Representatives and the Comptroller General of the General Accounting 
Office prior to publication of the rule in today's Federal Register. 
This rule is not a ``major rule'' as defined by section 804(2) of the 
APA as amended.

E. Unfunded Mandates

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), the EPA must prepare a budgetary impact 
statement to accompany any proposed or final rule that includes a 
Federal mandate that may result in estimated costs to State, local, or 
tribal governments in the aggregate; or to the private sector, of $100 
million or more. Under Section 205, the EPA must select the most cost-
effective and least burdensome alternative that achieves the objectives 
of the rule and is consistent with statutory requirements. Section 203 
requires the EPA to establish a plan for informing and advising any 
small governments that may be significantly or uniquely impacted by the 
rule.
    The EPA has determined that the action promulgated today does not 
include a Federal mandate that may result in estimated costs of $100 
million or more to either State, local, or tribal governments in the 
aggregate, or to the private sector. Therefore, the requirements of the 
Unfunded Mandates Act do not apply to this action.

List of Subjects in 40 CFR Part 63

    Environmental protection, Air pollution control, Hazardous 
substances, Reporting and recordkeeping requirements.

    Dated: June 11, 1996.
Carol M. Browner,
Administrator.
    For the reasons set out in the preamble, Title 40, Chapter I, part 
63, subparts F, H and I, of the Code of Federal Regulations are amended 
as follows:

PART 63--[AMENDED]

    1. The authority citation for Part 63 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart F--National Emission Standards for Organic Hazardous Air 
Pollutants From the Synthetic Organic Chemical Manufacturing 
Industry

Table 1 of Subpart F--[Amended]

    2. Table 1 of subpart F is amended by removing the entries for 
``Glycerol tri-(polyoxypro-pylene)ether,'' ``Polyethylene glycol,'' and 
``Polypropylene glycol'' and their associated chemical abstract service 
number and group number.

Subpart H--National Emission Standards for Organic Hazardous Air 
Pollutants for Equipment Leaks

    3. Section 63.160 is amended by adding paragraphs (c) and (f) to 
read as follows:

Sec. 63.160  Applicability and designation of source.

* * * * *
    (c) If a process unit subject to the provisions of this subpart has 
equipment to which this subpart does not apply, but which is subject to 
a standard identified in paragraph (c)(1), (c)(2), or (c)(3) of this 
section, the owner or operator may elect to apply this subpart to all 
such equipment in the process unit. If the owner or operator elects 
this method of compliance, all VOC in such equipment shall be 
considered, for purposes of applicability and compliance with this 
subpart, as if it were organic hazardous air pollutant (HAP). 
Compliance with the provisions of this subpart, in the manner described 
in this paragraph, shall be deemed to constitute compliance with the 
standard identified in paragraph (c)(1), (c)(2), or (c)(3) of this 
section.
    (1) 40 CFR part 60, subpart VV, GGG, or KKK; (2) 40 CFR part 61, 
subpart F or J; or (3) 40 CFR part 264, subpart BB or 40 CFR part 265, 
subpart BB.
* * * * *
    (f) The provisions of this subpart do not apply to research and 
development facilities or to bench-scale batch processes, regardless of 
whether the facilities or processes are located at the same plant site 
as a process subject to the provisions of this subpart.
    4. Section 63.161 is amended by adding in alphabetical order the 
definitions ``bench-scale batch process,'' ``flow indicator,'' and 
``sampling connection system'' to read as follows:

Sec. 63.161  Definitions.

* * * * *
    Bench-scale batch process means a batch process (other than a 
research and development facility) that is operated on a small scale, 
such as one capable of being located on a laboratory bench top. This 
bench-scale equipment will typically include reagent feed vessels, a 
small reactor and associated product separator, recovery and holding 
equipment. These processes are only capable of producing small 
quantities of product.
* * * * *
    Flow indicator means a device which indicates whether gas flow is, 
or whether the valve position would allow gas flow to be, present in a 
line.
* * * * *
    Sampling connection system means an assembly of equipment within a 
process unit used during periods of representative operation to take 
samples of the process fluid. Equipment used to take non-routine grab 
samples is not considered a sampling connection system.
* * * * *
    5. Section 63.163 is amended by adding paragraph (j) to read as 
follows:

Sec. 63.163  Standards: Pumps in light liquid service.

* * * * *
    (j) Any pump that is designated, as described in 
Sec. 63.181(b)(7)(i) of this subpart, as an unsafe-to-monitor pump is 
exempt from the requirements of paragraphs (b) through (e) of this 
section if:
    (1) The owner or operator of the pump determines that the pump is 
unsafe to monitor because monitoring personnel would be exposed to an 
immediate danger as a consequence of complying with paragraphs (b) 
through (d) of this section; and
    (2) The owner or operator of the pump has a written plan that 
requires monitoring of the pump as frequently as practical during safe-
to-monitor times, but not more frequently than the periodic monitoring 
schedule otherwise applicable.
    6. Section 63.166 is amended by revising paragraphs (a) and (b) to 
read as follows:

Sec. 63.166  Standards: Sampling connection systems.

    (a) Each sampling connection system shall be equipped with a 
closed-purge, closed-loop, or closed-vent system, except as provided in 
Sec. 63.162(b) of this subpart. Gases displaced during filling of the 
sample container are not required to be collected or captured.

[[Page 31440]]

    (b) Each closed-purge, closed-loop, or closed-vent system as 
required in paragraph (a) of this section shall:
    (1) Return the purged process fluid directly to the process line; 
or
    (2) Collect and recycle the purged process fluid to a process; or
    (3) Be designed and operated to capture and transport the purged 
process fluid to a control device that complies with the requirements 
of Sec. 63.172 of this subpart; or
    (4) Collect, store, and transport the purged process fluid to a 
system or facility identified in paragraph (b)(4)(i), (ii), or (iii) of 
this section.
    (i) A waste management unit as defined in Sec. 63.111 of subpart G 
of this part, if the waste management unit is subject to, and operated 
in compliance with the provisions of subpart G of this part applicable 
to group 1 wastewater streams. If the purged process fluid does not 
contain any organic HAP listed in Table 9 of subpart G of part 63, the 
waste management unit need not be subject to, and operated in 
compliance with the requirements of 40 CFR part 63, subpart G 
applicable to group 1 wastewater streams provided the facility has an 
NPDES permit or sends the wastewater to an NPDES permitted facility.
    (ii) A treatment, storage, or disposal facility subject to 
regulation under 40 CFR part 262, 264, 265, or 266; or
    (iii) A facility permitted, licensed, or registered by a State to 
manage municipal or industrial solid waste, if the process fluids are 
not hazardous waste as defined in 40 CFR part 261.
* * * * *
    7. Section 63.167 is amended by revising paragraph (a)(1) and by 
adding paragraph (e) to read as follows:

Sec. 63.167  Standards: Open-ended valves or lines.

    (a)(1) Each open-ended valve or line shall be equipped with a cap, 
blind flange, plug, or a second valve, except as provided in 
Sec. 63.162(b) of this subpart and paragraphs (d) and (e) of this 
section.
* * * * *
    (e) Open-ended valves or lines containing materials which would 
autocatalytically polymerize or, would present an explosion, serious 
overpressure, or other safety hazard if capped or equipped with a 
double block and bleed system as specified in paragraphs (a) through 
(c) of this section are exempt from the requirements of paragraph (a) 
through (c) of this section.
    8. Section 63.168 is amended by adding a new paragraph (a)(3) to 
read as follows:

Sec. 63.168  Standards: Valves in gas/vapor service and in light liquid 
service.

    (a) * * *
    (3) The use of monitoring data generated before April 22, 1994 to 
qualify for less frequent monitoring is governed by the provisions of 
Sec. 63.180(b)(6) of this subpart.
* * * * *
    9. Section 63.172 is amended by revising the first sentence of 
paragraph (j)(1) to read as follows:

Sec. 63.172  Standards: Closed-vent systems and control devices.

* * * * *
    (j) * * *
    (1) Install, set or adjust, maintain, and operate a flow indicator 
that takes a reading at least once every 15 minutes. * * *
* * * * *
    10. Section 63.173 is amended by adding paragraphs (h), (i) and (j) 
to read as follows:

Sec. 63.173  Standards: Agitators in gas/vapor service and in light 
liquid service.

* * * * *
    (h) Any agitator that is difficult-to-monitor is exempt from the 
requirements of paragraphs (a) through (d) of this section if:
    (1) The owner or operator determines that the agitator cannot be 
monitored without elevating the monitoring personnel more than two 
meters above a support surface or it is not accessible at anytime in a 
safe manner;
    (2) The process unit within which the agitator is located is an 
existing source or the owner or operator designates less than three 
percent of the total number of agitators in a new source as difficult-
to-monitor; and
    (3) The owner or operator follows a written plan that requires 
monitoring of the agitator at least once per calendar year.
    (i) Any agitator that is obstructed by equipment or piping that 
prevents access to the agitator by a monitor probe is exempt from the 
monitoring requirements of paragraphs (a) through (d) of this section.
    (j) Any agitator that is designated, as described in 
Sec. 63.181(b)(7)(i) of this subpart, as an unsafe-to-monitor agitator 
is exempt from the requirements of paragraphs (b) through (d) of this 
section if:
    (1) The owner or operator of the agitator determines that the 
agitator is unsafe to monitor because monitoring personnel would be 
exposed to an immediate danger as a consequence of complying with 
paragraphs (a) through (d) of this section; and
    (2) The owner or operator of the agitator has a written plan that 
requires monitoring of the agitator as frequently as practical during 
safe-to-monitor times, but not more frequently than the periodic 
monitoring schedule otherwise applicable.
    11. Section 63.174 is revised by adding a new paragraph (b)(4) and 
by revising the first sentence of paragraph (h)(1) introductory text to 
read as follows:

Sec. 63.174  Standards: Connectors in gas/vapor service and in light 
liquid service.

* * * * *
    (b) * * *
    (4) The use of monitoring data generated before April 22, 1994 to 
qualify for less frequent monitoring is governed by the provisions of 
Sec. 63.180(b)(6).
* * * * *
    (h)(1) Any connector that is inaccessible or is ceramic or ceramic-
lined (e.g., porcelain, glass, or glass-lined), is exempt from the 
monitoring requirements of paragraphs (a) and (c) of this section and 
from the recordkeeping and reporting requirements of Sec. 63.181 and 
Sec. 63.182 of this subpart. * * *
* * * * *
    12. Section 63.180 is amended by redesignating paragraph (b)(2) as 
(b)(2)(i) and revising the first sentence of newly designated paragraph 
(b)(2)(i), by adding a paragraph (b)(2)(ii), by revising paragraph 
(b)(4)(iii), by revising paragraph (b)(6), by revising paragraph 
(f)(1), and by adding a sentence to the end of paragraph (f)(4) to read 
as follows:

Sec. 63.180  Test methods and procedures.

* * * * *
    (b) * * *
    (2)(i) Except as provided for in paragraph (b)(2)(ii) of this 
section, the detection instrument shall meet the performance criteria 
of Method 21 of 40 CFR part 60, appendix A, except the instrument 
response factor criteria in Section 3.1.2(a) of Method 21 shall be for 
the average composition of the process fluid not each individual VOC in 
the stream. * * *
    (ii) If no instrument is available at the plant site that will meet 
the performance criteria specified in paragraph (b)(2)(i) of this 
section, the instrument readings may be adjusted by multiplying by the 
average response factor of the process fluid, calculated on an inert-
free basis as described in paragraph (b)(2)(i) of this section.
* * * * *
    (4) * * *
    (iii) The instrument may be calibrated at a higher methane 
concentration than the concentration specified for that piece of 
equipment. The concentration

[[Page 31441]]

of the calibration gas may exceed the concentration specified as a leak 
by no more than 2,000 parts per million. If the monitoring instrument's 
design allows for multiple calibration scales, then the lower scale 
shall be calibrated with a calibration gas that is no higher than 2,000 
parts per million above the concentration specified as a leak and the 
highest scale shall be calibrated with a calibration gas that is 
approximately equal to 10,000 parts per million. If only one scale on 
an instrument will be used during monitoring, the owner or operator 
need not calibrate the scales that will not be used during that day's 
monitoring.
* * * * *
    (6) Monitoring data that do not meet the criteria specified in 
paragraphs (b)(1) through (b)(5) of this section may be used to qualify 
for less frequent monitoring under the provisions in Sec. 63.168(d)(2) 
and (d)(3) or Sec. 63.174(b)(3)(ii) or (b)(3)(iii) of this subpart 
provided the data meet the conditions specified in paragraphs (b)(6)(i) 
and (b)(6)(ii) of this section.
    (i) The data were obtained before April 22, 1994.
    (ii) The departures from the criteria specified in paragraphs 
(b)(1) through (b)(5) of this section or from the specified monitoring 
frequency of Sec. 63.168(c) are minor and do not significantly affect 
the quality of the data. Examples of minor departures are monitoring at 
a slightly different frequency (such as every six weeks instead of 
monthly or quarterly), following the performance criteria of section 
3.1.2(a) of Method 21 of appendix A of 40 CFR part 60 instead of 
paragraph (b)(2) of this section, or monitoring at a different leak 
definition if the data would indicate the presence or absence of a leak 
at the concentration specified in this subpart. Failure to use a 
calibrated instrument is not considered a minor departure.
* * * * *
    (f) * * *
    (1) The batch product-process equipment train shall be pressurized 
with a gas to a pressure less than the set pressure of any safety 
relief devices or valves or to a pressure slightly above the operating 
pressure of the equipment, or alternatively, the equipment shall be 
placed under a vacuum.
* * * * *
    (4) * * * If such a pressure measurement device is not reasonably 
available, the owner or operator shall use a pressure measurement 
device with a precision of at least +10 percent of the test pressure of 
the equipment and shall extend the duration of the test for the time 
necessary to detect a pressure loss or rise that equals a rate of one 
psig per hour.
* * * * *
    13. Section 63.181 is amended by revising the introductory text in 
paragraph (b)(7) and by revising paragraph (b)(7)(ii) to read as 
follows:

Sec. 63.181  Recordkeeping requirements.

* * * * *
    (b) * * *
    (7) The following information pertaining to all pumps subject to 
the provisions of Sec. 63.163(j), valves subject to the provisions of 
Sec. 63.168(h) and (i) of this subpart, agitators subject to the 
provisions of Sec. 63.173(h) through (j), and connectors subject to the 
provisions of Sec. 63.174(f) through (h) of this subpart shall be 
recorded:
* * * * *
    (ii) A list of identification numbers for the equipment that is 
designated as difficult to monitor, an explanation of why the equipment 
is difficult to monitor, and the planned schedule for monitoring this 
equipment.
* * * * *

Subpart I--National Emission Standards for Organic Hazardous Air 
Pollutants for Certain Processes Subject to the Negotiated 
Regulation for Equipment Leaks

    14. Section 63.190 is amended by revising paragraph (f), paragraphs 
(g)(1) introductory text and (g)(2) introductory text, by adding 
paragraphs (g)(3) and (g)(4), and by adding a new paragraph (j) to read 
as follows:

Sec. 63.190  Applicability and designation of source.

* * * * *
    (f) The provisions of subparts I and H of this part do not apply to 
research and development facilities or to bench-scale batch processes, 
regardless of whether the facilities or processes are located at the 
same plant site as a process subject to the provisions of subpart I and 
H of this part.
    (g)(1) If an additional process unit specified in paragraph (b) of 
this section is added to a plant site that is a major source as defined 
in Section 112(a) of the CAA, the addition shall be subject to the 
requirements for a new source in subparts H and I of this part if:
* * * * *
    (2) If any change is made to a process subject to this subpart, the 
change shall be subject to the requirements for a new source in 
subparts H and I of this part if:
* * * * *
    (3) If an additional process unit is added to a plant site or a 
change is made to a process unit and the addition or change is 
determined to be subject to the new source requirements according to 
paragraphs (g)(1) or (g)(2) of this section:
    (i) The new or reconstructed source shall be in compliance with the 
new source requirements of subparts H and I of this part upon initial 
start-up of the new or reconstructed source or by April 22, 1994, 
whichever is later; and
    (ii) The owner or operator of the new or reconstructed source shall 
comply with the reporting and recordkeeping requirements in subparts H 
and I of this part that are applicable to new sources. The applicable 
reports include, but are not limited to:
    (A) Reports required by Sec. 63.182(b), if not previously 
submitted, Sec. 63.182 (c) and (d) of subpart H of this part; and
    (B) Reports and notifications required by sections of subpart A of 
this part that are applicable to subparts H and I of this part, as 
identified in Sec. 63.192(a) of this subpart.
    (4) If an additional process unit is added to a plant site, if a 
surge control vessel or bottoms receiver becomes subject to Sec. 63.170 
of subpart H, or if a compressor becomes subject to Sec. 63.164 of 
subpart H, and if the addition or change is not subject to the new 
source requirements as determined according to paragraphs (g)(1) or 
(g)(2) of this section, the requirements in paragraphs (g)(4)(i) 
through (g)(4)(iii) of this section shall apply. Examples of process 
changes include, but are not limited to, changes in production 
capacity, feedstock type, or catalyst type, or whenever there is 
replacement, removal, or addition of recovery equipment. For purposes 
of this paragraph, process changes do not include: process upsets, 
unintentional temporary process changes, and changes that are within 
the equipment configuration and operating conditions documented in the 
Notification of Compliance Status required by Sec. 63.182(c) of subpart 
H of this part.
    (i) The added emission point(s) and any emission point(s) within 
the added or changed process unit are subject to the requirements of 
subparts H and I of this part for an existing source;
    (ii) The added emission point(s) and any emission point(s) within 
the added or changed process unit shall be in compliance with subparts 
H and I of this part by the dates specified in paragraphs (g)(4)(ii)(A) 
or (g)(4)(ii)(B) of this section, as applicable.
    (A) If a process unit is added to a plant site or an emission 
point(s) is added to an existing process unit, the

[[Page 31442]]

added process unit or emission point(s) shall be in compliance upon 
initial start-up of the added process unit or emission point(s) or by 
April 22, 1997, whichever is later.
    (B) If a surge control vessel or bottoms receiver becomes subject 
to Sec. 63.170 of subpart H, if a compressor becomes subject to 
Sec. 63.164 of subpart H, or if a deliberate operational process change 
causes equipment to become subject to subpart H of this part, the owner 
or operator shall be in compliance upon initial start-up or by April 
22, 1997, whichever is later, unless the owner or operator demonstrates 
to the Administrator that achieving compliance will take longer than 
making the change. The owner or operator shall submit to the 
Administrator for approval a compliance schedule, along with a 
justification for the schedule. The Administrator shall approve the 
compliance schedule or request changes within 120 calendar days of 
receipt of the compliance schedule and justification.
    (iii) The owner or operator of a process unit or emission point 
that is added to a plant site and is subject to the requirements for 
existing sources shall comply with the reporting and recordkeeping 
requirements of subparts H and I of this part that are applicable to 
existing sources, including, but not limited to, the reports listed in 
paragraphs (g)(4)(iii)(A) and (g)(4)(iii)(B) of this section.
    (A) Reports required by Sec. 63.182 of subpart H of this part; and
    (B) Reports and notifications required by sections of subpart A of 
this part that are applicable to subparts H and I of this part, as 
identified in Sec. 63.192(a) of this subpart.
* * * * *
    (j) If a change that does not meet the criteria in paragraph (g)(4) 
of this section is made to a process unit subject to subparts H and I 
of this part, and the change causes equipment to become subject to the 
provisions of subpart H of this part, then the owner or operator shall 
comply with the requirements of subpart H of this part for the 
equipment as expeditiously as practical, but in no event later than 
three years after the equipment becomes subject.
    (1) The owner or operator shall submit to the Administrator for 
approval a compliance schedule, along with a justification for the 
schedule.
    (2) The Administrator shall approve the compliance schedule or 
request changes within 120 calendar days of receipt of the compliance 
schedule and justification.
    15. Section 63.191(b) is amended by adding in alphabetical order 
definitions for ``bench-scale batch process,'' ``process unit,'' and 
``source'' to paragraph (b) and revising the definition of 
``pharmaceutical production process'' to read as follows:

Sec. 63.191  Definitions.

    (b) * * *
    Bench-scale batch process means a batch process (other than a 
research and development facility) that is operated on a small scale, 
such as one capable of being located on a laboratory bench top. This 
bench-scale equipment will typically include reagent feed vessels, a 
small reactor and associated product separator, recovery and holding 
equipment. These processes are only capable of producing small 
quantities of product.
* * * * *
    Pharmaceutical production process means a process that synthesizes 
one or more pharmaceutical intermediate or final products using carbon 
tetrachloride or methylene chloride as a reactant or process solvent. 
Pharmaceutical production process does not mean process operations 
involving formulation activities, such as tablet coating or spray 
coating of drug particles, or solvent recovery or waste management 
operations.
* * * * *
    Process Unit means the group of equipment items used to process raw 
materials and to manufacture a product. For the purposes of this 
subpart, process unit includes all unit operations and associated 
equipment (e.g., reactors and associated product separators and 
recovery devices), associated unit operations (e.g., extraction 
columns), any feed and product storage vessels, and any transfer racks 
for distribution of final product.
* * * * *
    Source means the collection of equipment listed in Sec. 63.190(d) 
to which this subpart applies as determined by the criteria in 
Sec. 63.190. For purposes of subparts H and I of this part, the term 
affected source as used in subpart A of this part has the same meaning 
as the term source defined here.
* * * * *
    16. Section 63.192 is amended by redesignating paragraph (a) as 
(a)(1) and by adding paragraph (a)(2) to read as follows:

Sec. 63.192  Standard.

    (a)(1) * * *
    (2) The owner or operator of a pharmaceutical production process 
subject to this subpart may define a process unit as a set of 
operations, within a source, producing a product, as all operations 
collocated within a building or structure or as all affected operations 
at the source.
* * * * *
[FR Doc. 96-15616 Filed 6-19-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-15566 Oral Dosage Form New Animal Drugs; Neomycin Sulfate Oral Solution
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31397-31398]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15566]

-----------------------------------------------------------------------

21 CFR Part 520

Oral Dosage Form New Animal Drugs; Neomycin Sulfate Oral Solution

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is amending the animal 
drug regulations to reflect approval of an abbreviated new animal drug 
application (ANADA) filed by Rhone Merieux, Inc. The ANADA provides for 
the use of a generic neomycin sulfate oral solution in drinking water 
or in milk for cattle (excluding veal calves), swine, sheep, and goats 
for the treatment and control of colibacillosis.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Melanie R. Berson, Center for 
Veterinary Medicine (HFV-135), Food and Drug Administration, 7500 
Standish Pl., Rockville, MD 20855, 301-594-1643.

SUPPLEMENTARY INFORMATION: Rhone Merieux, Inc., 7101 College Blvd., 
Overland Park, KS 66210, filed ANADA 200-153, which provides for the 
use of neomycin sulfate oral solution in drinking water or in milk of 
cattle (excluding veal calves), swine, sheep, and goats for the 
treatment and control of colibacillosis (bacterial scours) caused by 
Escherichia coli susceptible to neomycin. ANADA 200-153 is approved as 
a generic copy of The Upjohn Co.'s NADA 11-035. The ANADA is approved 
as of May 8, 1996, and the regulations are amended in 21 CFR 
520.1485(b) and (d)(3) to reflect the approval. The basis for approval 
is discussed in the freedom of information summary.
    In accordance with the freedom of information provisions of part 20 
(21

[[Page 31398]]

CFR part 20) and Sec. 514.11(e)(2)(ii) (21 CFR 514.11(e)(2)(ii)), a 
summary of safety and effectiveness data and information submitted to 
support approval of this application may be seen in the Dockets 
Management Branch (HFA-305), Food and Drug Administration, 12420 
Parklawn Dr., rm. 1-23, Rockville, MD 20857, between 9 a.m. and 4 p.m., 
Monday through Friday.
    The agency has carefully considered the potential environmental 
effects of this action. FDA has concluded that the action will not have 
a significant impact on the human environment, and that an 
environmental impact statement is not required. The agency's finding of 
no significant impact and the evidence supporting that finding, 
contained in an environmental assessment, may be seen in the Dockets 
Management Branch (address above) between 9 a.m. and 4 p.m., Monday 
through Friday.

List of Subjects in 21 CFR Part 520

    Animal drugs.
    Therefore, under the Federal Food, Drug, and Cosmetic Act and under 
authority delegated to the Commissioner of Food and Drugs and 
redelegated to the Center for Veterinary Medicine, 21 CFR part 520 is 
amended as follows:

PART 520--ORAL DOSAGE FORM NEW ANIMAL DRUGS

    1. The authority citation for 21 CFR part 520 continues to read as 
follows:

    Authority: Sec. 512 of the Federal Food, Drug, and Cosmetic Act 
(21 U.S.C. 360b).

    2. Section 520.1485 is amended by revising paragraph (b) and the 
last sentence of paragraph (d)(3) to read as follows:

Sec. 520.1485  Neomycin sulfate oral solution.

*- * * * *
    (b) Sponsors. See Nos. 000009, 050604, and 059130 in 
Sec. 510.600(c) of this chapter.
* * * * * -
    (d) * * *
    (3) * * * Discontinue treatment prior to slaughter as follows: For 
sponsors 000009 and 059130: 30 days for cattle and goats, and 20 days 
for swine and sheep; for sponsor 050604: 1 day for cattle (not for use 
in veal calves), 2 days for sheep, and 3 days for swine and goats.

    Dated: June 10, 1996.
Shephen F. Sundlof,
Director, Center for Veterinary Medicine.
[FR Doc. 96-15566 Filed 6-19-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-15564 Excess Flow ValvePerformance Standards
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31449-31459]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15564]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Part 192

[Docket No. PS-118; Amendment 192-79]
RIN 2137-AB97

Excess Flow Valve--Performance Standards

AGENCY: Research and Special Programs Administration, (RSPA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In the process of routine excavation activities, excavators 
often sever gas service lines causing loss of life, injury, or property 
damage by fire or explosion. Excess flow valves (EFVs) restrict the 
flow of gas by closing automatically when a line is severed, thus 
mitigating the consequences of service line failures. In this final 
rule, RSPA has developed standards for the performance of EFVs used to 
protect single-residence service lines. If an EFV is installed on such 
a line, it must meet these performance standards.

DATES: This final rule takes effect July 22, 1996.

FOR FURTHER INFORMATION CONTACT: Mike Israni (202) 366-4571, regarding 
the subject matter of this final rule, or the Dockets Unit, (202) 366-
4453, regarding copies of this final rule or other material in the 
docket that is referenced in this rule.

SUPPLEMENTARY INFORMATION:

Statutory Mandate

    In 49 U.S.C. 60110 Congress directs the Department of 
Transportation to issue regulations prescribing the circumstances under 
which operators of natural gas distribution systems must install EFVs. 
If the Department determines that there are no circumstances under 
which EFVs should be installed, the Department is to report this 
determination, and the reasons for the decision, to Congress. RSPA, on 
behalf of the Department, has determined that there are no 
circumstances under which the Department should require the 
installation of EFVs, primarily because the costs far exceed the 
benefits of such installation. RSPA has sent the report of its reasons 
for this determination to Congress. The report to Congress (April 4, 
1995) and the cost/benefit analysis of mandatory EFV installation are 
available in the docket. Costs and benefits are also discussed later in 
this document under ``Cost/Benefit Analysis.''
    49 U.S.C. 60110 further requires the Department to develop 
standards for the performance of EFVs used to protect service lines in 
a natural gas distribution system. The development of these standards 
is the subject of this rulemaking.
    The statute also requires the Department to issue a rule requiring 
operators to notify customers about EFV availability and to offer to 
install EFVs that meet the performance standards, if the customer pays 
for the installation. RSPA will initiate a separate notice of proposed 
rulemaking for customer notification.

The Problem

    Despite efforts, such as damage prevention programs, to reduce the 
frequency of excavation-related service line incidents on natural gas 
distribution service lines, such incidents persist and continue to 
result in death, injury, fire, or explosion. During the period from 
March 1991 through February 1994, 30 incidents with consequences that 
might have been mitigated by an EFV were reported to RSPA. These 
incidents, mostly excavation-related, resulted in 2 fatalities, 16 
injuries, and an estimated $3,249,595 in property damage. Incident 
history is explained in the November 1991 and January 1995 cost/benefit 
studies evaluating mandatory EFV installation. Because damage 
prevention measures are not foolproof, RSPA has sought to identify ways 
to mitigate the consequences of these incidents. The National 
Transportation Safety Board (NTSB) and others have proposed EFVs as a 
means of mitigation.

NTSB Recommendations

    NTSB has recommended EFVs as a means of reducing or preventing 
injury or death from incidents resulting from service line breaks or 
ruptures. Since 1971, NTSB has issued seven recommendations regarding 
the use of EFVs in service lines. NTSB's recommendations are summarized 
and discussed in the Notice of Proposed Rulemaking on this rulemaking 
(58 FR 21524; April 21, 1993).

The Advance Notice of Proposed Rulemaking (ANPRM)

    RSPA issued an ANPRM (55 FR 52188; December 20, 1990) seeking 
information on the desirability of requiring the installation of EFVs 
on gas distribution service lines to reduce the damage from service 
line ruptures. The ANPRM also contained a questionnaire to collect 
current operational data on the use of EFVs by natural gas distribution 
operators. The results of the

[[Page 31450]]

ANPRM were summarized in the NPRM and are available in the docket.

The Notice of Proposed Rulemaking (NPRM)

    In 1993, RSPA published an NPRM (Notice 2: 58 FR 21524; April 21, 
1993), titled ``Excess Flow Valve Installation on Service Lines,'' that 
proposed to amend 49 CFR Part 192 to require installation of EFVs on 
new and replaced single residence service lines operating at a pressure 
of 10 psig or more. This NPRM also proposed performance standards for 
EFVs and conditions under which EFVs must be installed. The initial 
comment period for this NPRM closed June 21, 1993. The NPRM is 
available in the docket.
    RSPA received 140 written comments in response to the NPRM: 14 from 
industry associations, 1 from an EFV manufacturer, 102 from local 
distribution companies, 2 from consultants, 17 from Congress, state 
agencies, and regulatory associations, 3 from transmission companies, 
and 1 from a group of commenters, designated hereafter as the Joint 
Commenters (see below).

The Public Meeting

    RSPA held a public meeting on June 18, 1993 (58 FR 33064; June 15, 
1993) to enable interested parties to present additional comments on 
several of the issues presented in the NPRM. In the notice announcing 
the public meeting, RSPA also extended the comment period to July 6, 
1993, to allow those not able to attend the meeting to have access to 
the transcript. Representatives of the American Gas Association (AGA), 
UMAC (an EFV manufacturer), the Gas Safety Action Council (GASAC), the 
National Association of Pipeline Safety Representatives (NAPSR), and 
NTSB spoke at the meeting. The AGA representative objected to the 
proposed rule, especially to the expected benefits estimated in the 
cost/benefit study. GASAC, NTSB, and UMAC supported an EFV rule, but 
not as proposed. The NAPSR representative noted that in NAPSR's 
experience EFVs have not been cost beneficial.

The Joint Commenters

    On December 20, 1993, a group, designating itself as the Joint 
Commenters, filed comments that recommended language to include in an 
EFV rule. The Joint Commenters included GASAC, EFV manufacturers, and 
two gas pipeline distribution associations. Although not a signatory to 
the comments, NTSB sent two letters to a pipeline association 
supporting the Joint Commenters' recommendations. The NTSB letters are 
available in the docket.
    The Joint Commenters did not include representatives from the two 
major state pipeline safety associations, NAPSR, and the National 
Association of Regulatory Utility Commissioners (NARUC). NAPSR 
originally participated in discussions with the Joint Commenters but 
later dropped out because NAPSR members oppose a federal requirement to 
install EFVs. The comments from NAPSR are available in the docket.
    The Joint Commenters recommended regulatory language that their 
signatories would support if RSPA were to adopt this recommendation as 
a final rule. In a Notice of Reopening Comment Period, RSPA reopened 
the comment period to solicit comment on the safety merits of the Joint 
Commenters' recommended language (59 FR 39319; August 2, 1994). The 
reopened comment period closed October 3, 1994. In addition to seeking 
comments on the safety merits of the recommendation, RSPA also sought 
comment on: whether to allow EFVs with a bypass feature; whether, and 
to what extent, the presence of contaminants in the gas stream should 
preclude installation of an EFV; and whether RSPA should delay issuing 
a rule until industry performance standards for EFVs are developed.
    An additional 70 comments were received in response to the Notice 
of Reopening Comment Period: 7 from industry associations, 1 from an 
EFV manufacturer, 56 from local distribution companies, 5 from 
Congress, state agencies, and regulatory associations, and 1 from a 
transmission company. A discussion of the 140 comments to the NPRM and 
70 comments to the Notice of Reopening Comment Period and RSPA 
disposition of these comments is found below.

Advisory Committee Review

    The Technical Pipeline Safety Standards Committee (TPSSC) was 
established by statute to evaluate the technical feasibility, 
reasonableness, and practicability of proposed regulations. The TPSSC 
met on August 3, 1993, in Washington, DC, to consider the EFV standards 
proposed in the April 1993 NPRM. The TPSSC voted 11 to 0 against 
adopting the proposed rule as written. In addition, the TPSSC voted 10 
to 1 against RSPA issuing any rule on EFVs. However, the TPSSC voted 10 
to 1 to respect the wishes of Congress and to provide support for the 
Congressional mandate as implemented by RSPA. RSPA addresses each of 
the TPSSC's recommendations in the discussion of comments below.

Petition for Rulemaking

    On July 14, 1995, AGA submitted a petition for rulemaking on EFV 
performance standards and customer notification requirements. In this 
petition, AGA urged OPS to adopt industry performance and manufacturing 
standards as soon as they are available and, in the interim, to adopt 
the performance standards recommended by the Joint Commenters. RSPA is 
not required to consider those comments in the petition pertaining to 
performance standards since the comments were received well after the 
close of the re-opened comment period. However, RSPA notes that those 
comments do not raise any issues not already raised in prior comments 
and addressed in this rule.
    RSPA will consider the bulk of AGA's petition dealing with customer 
notification requirements in the customer notification rulemaking.

Cost/Benefit Analysis (Mandating EFV installation)

    RSPA recognizes the beneficial safety effects of EFVs. However, 
after extensive study and rulemaking, RSPA has decided not to require 
the installation of EFVs, primarily because the costs far exceed the 
benefits of such installation.
    Many comments to the NPRM and Notice of Reopening Comment Period 
cited the need for RSPA to redo the cost/benefit study that had been 
prepared to accompany the NPRM. Commenters said incident frequency, 
fire and police response costs, and property damage costs were 
overstated. The most frequent objection was that RSPA overestimated 
property loss and fire fighting costs for incidents with less than 
$5,000 in property damage. Commenters pointed out that leaks occur with 
greater frequency than incidents and that, by equating leak repair 
reports with incident reports, RSPA overstated the benefits to be 
gained. Many commenters also said that the $20 estimated cost to 
install an EFV was too low.
    In light of the commenters' criticisms, RSPA thoroughly reexamined 
the cost/benefit study. The revised study included updated data 
regarding service line incidents and revised information on related 
costs and anticipated benefits. In the most significant benefit change, 
RSPA reduced its estimate of the number of nonreportable incidents that 
could have benefitted from an EFV installation. Criticisms of its 
estimates on nonreportable incidents led RSPA to conclude that the 
original estimate, over

[[Page 31451]]

143 thousand per year, significantly overstated the number of 
nonreportable incidents whose consequences might be mitigated by EFVs. 
RSPA used a different approach to develop a more reasonable estimate, 
approximately 13 thousand per year, for the final study. This revised 
number of nonreportable incidents is largely responsible for the 
decrease in the present value of the benefits from $21.02-$35.00 per 
service in the draft study to $7.42 per service in the final study.
    In other changes, RSPA revised its cost estimate by using the mid-
point of the cost-range in EFVs. The original estimate looked only at 
the EFV cost to the largest current installers of EFVs, whereas the 
revised estimate considered the EFV cost to all current installers of 
EFVs. RSPA also used newer incident data to develop better estimates of 
the consequences of incidents before and after an EFV installation.
    As a result of RSPA's reexamination of the cost/benefit study, the 
present value of costs changed from the draft study figure of $20.20 
per installed EFV with a bypass to a final study figure of $30.29. In 
addition, in the final study, the present value of costs for an EFV 
with positive shutoff was estimated to be $37.09 per installed EFV.
    The final cost/benefit study found the cost of installing an EFV to 
exceed the benefits by a 4.5:1 ratio. This result, along with 
consideration of other criticisms of a rule requiring installation, 
discussed in more detail below, led RSPA to determine that it would not 
require installation but would require that any EFV installed meet 
certain performance criteria. The final cost/benefit study explains in 
detail how each cost and benefit was calculated. Both the draft and 
final cost/benefit studies examining EFV installation are available in 
the docket.

The Final Rule

    The final rule establishes a new section in the pipeline safety 
regulations, Sec. 192.381, ``Service lines: Excess flow valve 
performance standards.'' For the reasons previously explained, the 
final rule does not require installation of EFVs. In accordance with 49 
U.S.C. 60110, the rule sets performance standards for any EFV that will 
be used in a single-residence gas service line operating continuously 
at not less than 10 psig. The final rule incorporates almost all the 
performance standards that the Joint Commenters recommended, rather 
than those RSPA proposed in the NPRM.
    An EFV will have to be manufactured and tested by the manufacturer 
according to an industry specification or a manufacturer's written 
specification to ensure that the EFV will function properly up to its 
rated maximum operating pressure and at all temperatures expected in 
the service line's operating environment. An EFV, like any other valve, 
will have to comply with subparts B and D of Part 192. The required 
tolerance has been raised so that an EFV will be required to close at, 
or not more than 50 percent above the rated flow, instead of at the 
proposed 10 percent. As commenters requested, an operator will have the 
choice of using an EFV with either a positive shutoff or bypass 
feature. Upon closure an EFV must reduce the gas flow to no more than 5 
percent of the manufacturer's specified minimum flow rate, up to a 
maximum of 20 cubic feet per hour for a bypass-type EFV or 0.4 cubic 
feet per hour for a positive shut off-type EFV. An operator will have 
to mark or otherwise identify the presence of an EFV in the service 
line.
    Several proposed performance requirements have not been adopted. An 
EFV will not have to comply with the requirements of Secs. 192.363 and 
192.365 that apply to other service line valves. Service line capacity 
will not have to exceed the manufacturer's EFV flow rating by 50 
percent. An EFV will not be required to be tested upon installation and 
each time a customer's meter is removed or replaced, or to close 
automatically if the customer's meter, regulator or service valve is 
sheared off. Furthermore, an operator will not be required to verify 
the rated flow or replace an EFV that does not close automatically.
    The final rule recommends that an operator locate an EFV beyond the 
hard surface and as near as practical to the fitting connecting the 
service line to its source of gas supply to ensure that the EFV 
protects the maximum length of service line and to assist in locating 
the EFV. The final rule also recommends that to augment performance 
reliability, an operator not install an EFV where the contaminants in 
the gas stream will cause the valve to malfunction or interfere with 
necessary operation and maintenance activities on the service line, 
such as blowing liquids from the line.

Discussion of Comments

    Although comments were submitted in response to the proposal to 
require installation of EFVs, these comments were also relevant to 
developing a performance standards rule. Many of the comments focussed 
on the performance criteria RSPA included in the proposal.
    General Comments--Except for NTSB, valve manufacturers, and GASAC, 
virtually all of the 140 commenters to the NPRM objected to the 
proposed rule on installation. The major objections were that EFV 
installation should not be federally mandated, that each state pipeline 
authority should be allowed to establish the rules for its state; that 
a positive shutoff EFV should not be required; that testing an EFV 
while in service is unnecessary and overly expensive; that EFV 
installation should be delayed until industry standards are developed; 
and, that the cost/benefit study supporting the proposed rule is 
flawed. The majority of commenters also maintained that EFV 
installation should not be required where contaminants could cause the 
EFV to malfunction and inadvertently shutoff service to the customer.
    Nearly all of the 70 commenters responding to the Notice of 
Reopening Comment Period proposed that RSPA adopt the Joint Commenters' 
recommendations on performance language because the recommended 
language was less objectionable than the NPRM's proposed language. The 
commenters also favored giving an operator the option to install either 
a bypass or positive shutoff EFV. Overall, because of concerns about 
EFV reliability, gas distribution operators favored waiting until 
industry standards are developed and accepted before requiring 
installation of EFVs. Many commenters restated their objection to the 
findings of the cost/benefit study.
    Six large operators operating at least 9 million service lines (18 
percent of all U.S. service lines) opposed both the NPRM's proposal and 
the Joint Commenters' recommendations. The operators' major objections 
were that the cost/benefit study grossly overstated benefits, that 
industry standards are needed because EFVs do not operate reliably, and 
that costs to remove EFVs after a malfunction are high.
    Comments about the cost/benefit study have previously been 
discussed. Other general comments are discussed below, as well as 
specific comments about each RSPA-proposed performance standard and the 
associated Joint Commenters' recommendation. To avoid repetition, 
similar comments are discussed in only one section.

Discussion on State vs. Federal Mandate

    Comments--NAPSR expressed opposition to any federal mandate to 
install EFVs, arguing that any such regulatory requirements should be 
at the state level. On two occasions NARUC passed resolutions proposing 
that any requirement for EFVs be determined by

[[Page 31452]]

the individual state pipeline safety agencies. The NARUC Subcommittee 
for Pipeline Safety polled the state regulatory agencies, gathered 
data, and prepared a report of its findings. NARUC found that only two 
states, Massachusetts and New York, favored a federal mandate to 
install EFVs.
    Six major operators (three operating in California) opposed any 
federal requirement to install EFVs, arguing that states should be 
allowed to determine the need for EFVs based on state- developed 
criteria.
    Response--Because of RSPA's decision not to issue a rule requiring 
the installation of EFVs, each state will be able to determine if it 
should require such installation based on circumstances unique to that 
state.

Industry Standards

    In the absence of standards by an industry-sponsored safety 
standards committee, RSPA proposed several requirements for the 
manufacture and operation of any EFV that would be installed in a 
single-residence gas service line. The Joint Commenters' recommendation 
also included performance standards for single- residence gas service 
lines.
    Comments on NPRM--Many commenters said RSPA should not issue a 
final rule until industry manufacturing and performance safety 
standards are prepared and adopted. The TPSSC recommended that RSPA 
initiate the development of standards by The American National 
Standards Institute (ANSI), American Society of Testing Materials 
(ASTM), or other nationally recognized and accredited organization for 
the manufacture, testing, and operation of EFVs. The TPSSC further 
recommended that when such standards are enacted, RSPA should issue an 
NPRM for EFVs incorporating such standards for TPSSC review. The Gas 
Piping Technology Committee (GPTC) commented that its ANSI/GPTC Z380 
committee was developing performance, operating, and installation 
guidelines for EFVs. GPTC said guidance will be offered on choosing 
operating pressure ranges, flow rates, bleed-by, and reset 
characteristics, length and diameter of service piping, inline 
contaminants, purging procedures, joining methods, and service line 
locations.
    Comments to Notice of Reopening Comment Period--Many commenters 
said RSPA should take no final action until industry standards are 
available because standards would assure EFV reliability. Many others 
said RSPA should issue a final rule but grant a one year delay in 
implementation to give the industry committees time to complete 
manufacturing and operational standards. Several commenters said the 
ASTM F17 committee is preparing testing standards and the ANSI/GPTC 
Z380 committee is preparing guidelines that should be completed in 
1995.
    Response--RSPA agrees that to achieve performance reliability and 
the desired safety benefits, specifications are necessary to ensure 
uniformity among EFVs installed in service lines. Because the NPRM 
proposing required installation only sought comment on performance 
standards applicable to EFVs installed in single-residence service 
lines, this final rule limits EFV performance standards to that 
application. Once industry standards are developed for EFVs used in 
other applications, such as multiple residences and commercial 
enterprises, RSPA will consider seeking comment on proposed performance 
standards for those applications.
    The final rule requires that when an EFV is installed in a single 
residence service line, the EFV must be manufactured and tested by the 
manufacturer according to an industry specification, or to a 
manufacturer's written specification to ensure the EFV performs 
specified minimum functions. These specifications will ensure that an 
EFV functions properly up to the maximum operating pressure at which it 
is rated and at all temperatures reasonably expected in the service 
line's operating environment. These specifications will further ensure 
that an EFV is sized to close within 50 percent of the rated closure 
rate, to reduce gas flow upon closure to specified rates, and to not 
close when the pressure and flow rates are less than the manufacturer's 
specified minimums.
    In addition, an EFV must comply with the general requirements of 
Subparts B and D of part 192. While subparts B and D do not include 
operational requirements specific to an EFV, they do include general 
material and design standards applicable to any valve in a pipeline 
system.
    Many commenters, including several industry committees, indicated 
that EFV standards are forthcoming. However, until industry finalizes 
EFV standards, the requirement that an EFV perform specified functions 
according to a manufacturer's written specifications will ensure that 
an EFV performs reliably and safely. Moreover, final industry 
performance specifications are likely to be similar to manufacturers' 
specifications, because valve manufacturers are often members of the 
industry organizations that develop such specifications.
    Proposed Section 192.381(a)--(regarding Secs. 192.363 and 192.365 
gas pipeline valve requirements)--RSPA proposed in the NPRM that EFVs 
must comply with the requirements of Secs. 192.363 and 192.365. These 
existing sections establish requirements for all valves in gas service 
lines.
    Comments--Several commenters stated that Secs. 192.363 and 192.365 
should not apply to EFVs. Commenters pointed out that these 
requirements apply to the design of service line manual shut-off valves 
and would conflict with the proposed EFV requirements. For example, 
commenters noted that the Sec. 192.365(c) requirement to locate valves 
in a covered durable box or standpipe is intended to allow for ready 
operation of a service line manual shut-off valve. Therefore, it would 
be unnecessary and costly to apply this requirement to an EFV, which is 
an automatic valve not requiring access for manual operation.
    Response--After further study, RSPA agrees that valve requirements 
concerning the use of a durable box or standpipe do not apply to EFVs, 
and the other requirements of Secs. 192.363 and 192.365 apply only to 
manual shut-off type valves, not EFVs. Accordingly, the proposed 
requirement that EFVs comply with Secs. 192.363 and 192.365 has not 
been adopted.
    Proposed Section 192.381(a)--(10 psig requirement)-RSPA proposed 
that an EFV be installed on each newly installed or replaced single 
residence service line that operates at a pressure not less than 10 
psig.
    Comments--Many commenters to both the NPRM and the Notice of 
Reopening Comment Period requested clarification of the 10 psig 
threshold. Many commenters asked if the requirement would apply if 
pressure in the pipeline system drops below 10 psig at any time during 
the year.
    Response--RSPA is not requiring operators to install EFVs on any 
single-residence service line, whatever its operating pressure. 
However, RSPA does not want an EFV, if installed, to cause a loss in 
service, especially at a time when the service is most needed by the 
consumer, such as during the winter heating season. Thus, the 
performance standards have been established for EFVs that are installed 
on a service line that operates at or above 10 psig continuously during 
the year. Setting the performance standards at this threshold is 
influenced by two of the largest users of EFVs who, as standard 
practice, limit EFV installation to service lines in systems where 
service line inlet pressure does not drop below 10 psig during the 
year.

[[Page 31453]]

    Because service line pressure will most likely be at its lowest 
level during the coldest weather, especially in colder climates, an 
operator should consider the pressure drop in the service line due to 
the restriction of gas flow caused by an EFV. If pressure drop is 
considered, an EFV should not cause a reduction in safety or loss of 
service in any service line.
    Proposed Section 192.381(a)--(replaced service lines)--RSPA 
proposed that EFVs be installed on certain new and replaced service 
lines.
    Response--This proposal is no longer relevant since EFV 
installation is not being required.
    Proposed Section 192.381(b)(1)--(installation)--RSPA proposed in 
the NPRM that an EFV be installed as close to the main or transmission 
line as practicable. The Joint Commenters recommended installation in 
or as near as practicable to the service line fitting connecting the 
service line to its gas supply.
    Comments--Many commenters suggested RSPA remove any reference to 
transmission lines in the rule. Several commenters said EFVs are not 
available that will withstand transmission line pressures. Others 
stated that the statutory mandate was intended to apply only to 
distribution systems. The TPSSC voted 7 to 4 that all references to 
transmission lines be dropped from the proposed rule.
    A few commenters objected to what they thought was the proposed 
requirement to install EFVs immediately downstream of the service-to-
main connection when the line serves more than one residence (branch 
service). Other commenters were concerned that the proposed rule would 
require EFV installation below hard surfaces such as asphalt or 
concrete, making installation very costly.
    Response--In the NPRM, RSPA intended that all new and replaced 
service lines, whether from a main or transmission line, where the 
source of gas supply consistently operates above 10 psig, be required 
to have an EFV installed. The reference to ``main'' and 
``transmission'' lines was intended to cover farm taps, as farm taps 
are also subject to the type of incident that could benefit from an 
EFV. The final rule deletes the reference to ``main'' and 
``transmission'' and sets performance standards for EFVs installed on 
single-residence gas service lines. By referring to ``service'' line, 
RSPA intends for the standards to apply if an EFV is installed on a 
farm tap. A farm tap operates as a service line when a local 
distribution company operates a metered farm tap on a transmission line 
delivering gas to a farmer or other landowner. Accordingly, although 
the rule does not require installation on any single-residence service 
line, an EFV that meets the required performance standards can be 
installed on a service line from a main or a branch off a transmission 
line.
    RSPA never intended that an EFV serve more than one family 
residence. RSPA recognizes that an EFV would be difficult to size when 
the gas supply is serving multiple residences because of widely varying 
gas volume through the EFV. Because of this difficulty, the performance 
standards in this final rule are limited to EFVs that are installed on 
single-residence service lines.
    RSPA agrees that removing an EFV under a hard surface would be 
overly expensive if an EFV failed to function. Therefore, RSPA 
recommends that an EFV be located beyond the hard surface and as near 
as practical to the fitting connecting the service line to its source 
of gas supply.
    Proposed Section 192.381(b)(2)--(Section 192 Subparts B & D)--As 
noted above, the NPRM proposed and the Joint Commenters recommended 
that EFVs meet the applicable requirements of subparts B and D of part 
192.
    Comments--No substantive comments were received on this proposal.
    Response--Subpart B establishes minimum requirements for selection 
and qualification of materials to be used in pipelines. Subpart D 
prescribes minimum requirements for the design and installation of 
pipeline components and facilities. Since these requirements are 
general performance requirements that apply to all valves, they are 
included in the performance requirements applicable to EFVs.
    Proposed Section 192.381(b)(3)--(bypass)--RSPA proposed that an EFV 
be designed to prevent pressure equalization across the EFV after the 
EFV closes, thereby prohibiting an operator from installing an EFV with 
a bypass feature. The bypass feature allows pressure to equalize and 
the EFV to automatically reopen after closure because it allows a small 
amount of gas to pass through the EFV. In contrast, a positive shutoff 
feature allows only minute amounts of gas to pass through the EFV after 
it closes, and requires backpressuring downstream to reset the EFV. The 
Joint Commenters' recommendation would allow either type of EFV.
    In the Notice of Reopening Comment Period, RSPA sought comment on 
the safety of using EFVs with or without the bypass feature and gave 
two examples, provided by two large local distribution operators, of 
potential dangers that might be caused by the bypass feature. RSPA also 
asked for comments on the conditions under which automatically 
resetting EFVs should or should not be required in residential service 
lines and on the linkage between the bypass feature and unauthorized 
repairs to damaged service lines.
    Comments to NPRM--Many commented on the proposal prohibiting the 
use of EFVs with a bypass feature. Commenters, including several at the 
public meeting, were virtually unanimous in favor of an operator having 
the option to select an EFV with either the bypass or positive shutoff 
feature. Similarly, the TPSSC voted 9 to 2 in favor of an operator 
having this option.
    Various reasons were given for not prohibiting the installation of 
bypass EFVs. Several commenters, including an industry association, 
complained that RSPA proposed the positive shutoff requirement without 
sufficient justification in the cost/benefit study. One commenter said 
that additional costs of at least $250 per utility crew would be 
incurred to provide backpressure downstream of the EFV to equalize the 
pressure and reset the valve. This commenter said these services would 
necessitate extra equipment, including a compressed natural gas tank or 
portable natural gas compressor, and additional piping, fittings, and 
hoses. Other commenters mentioned additional hazards to personnel in 
hauling and connecting compressed natural gas. Another commenter was 
concerned with customer inconvenience because a service call would be 
necessary to backpressure the EFV, delaying restoration of service.
    Many commenters argued that bypass-type EFVs do not pose a 
significant safety risk. Commenters maintained that operators that 
regularly install EFVs have had no incidents resulting from use of 
bypass-type EFVs. Three of the largest voluntary users of EFVs (with 
over 300,000 EFVs in service) commented that their data did not show an 
incident having occurred due to a bypass- type EFV. An EFV manufacturer 
commented that it has no knowledge of bypass gas ever contributing to a 
natural gas incident. NTSB and many operators echoed these assurances.
    Several commenters, including EFV users, said RSPA's concern that 
the bypass feature would allow irresponsible excavators to make repairs 
is unfounded. A few commenters said that positive shutoff EFVs would 
cause more safety problems than bypass-type EFVs because an excavator 
could sever a service line unknowingly if the

[[Page 31454]]

positive shutoff were to completely stop the gas flow and any released 
odor from reaching the atmosphere. Conversely, these commenters argued 
that a failed service line with a bypass would continuously release gas 
and leave a readily detectable odor. Commenters noted other potential 
problems with positive shutoff EFVs. For example, a commenter in Alaska 
pointed out that an earthquake in the winter could cause EFVs to engage 
and, if positive shutoff EFVs were used, each would have to be 
backpressured and each customer's appliance re-lighted. During an 
Alaskan winter this could take days.
    The Gas Research Institute (GRI) stated that its tests of EFV 
models showed all the tested models were affected by pressure surges of 
5 psi or more and that opening, closing, or throttling a main line 
valve could activate an EFV, causing a false closure. The research 
organization said RSPA could infer from these results that the use of 
EFVs without the bypass could cause extended distribution service 
outages. GRI further stated that it knows of no reports of bypass flow 
in an EFV having led to or increased the severity of an accident.
    GASAC commented that RSPA should allow each operator to determine 
the type of valves for its system. Other commenters echoed this 
statement. Even among those operators opposed to a mandatary rule, most 
said that if a rule were issued, the choice of which type of EFV to use 
should be left to the operator.
    Comments on the Joint Commenters' Recommendation - Many commenters 
supported the Joint Commenters' recommendation to allow the use of a 
bypass-type EFV. Many commenters said it is not appropriate to depend 
on an EFV's design to prevent unauthorized repairs. Rather, 
unauthorized repairs should be controlled by stiffer penalties and 
better enforcement of damage prevention laws. These commenters 
maintained that EFVs are used to provide safety when a service line is 
severed, and should not be expected to perform functions beyond their 
intended purpose.
    Many commenters said excavators who damage service lines may make 
unauthorized repairs regardless of whether a bypass-type EFV, a 
positive shutoff EFV, or no EFV is installed. RSPA recognizes the 
validity of this statement and that EFVs with either feature are not 
likely to have a substantial effect in either reducing or increasing 
the frequency of unauthorized repairs on a broken service line.
    To dispel RSPA's concern about the potential danger of bypass- type 
EFVs and gas discharge into a residence, an operator explained that 
since natural gas is only about 0.6 times the density of air, any raw 
gas passing through a vented appliance would exhaust to the atmosphere 
through the chimney. The operator concluded that household gas ranges 
(or space heaters) without burner safety pilots are the only paths for 
raw gas to disperse through a building. The operator cited a recent 
study by NOVA, a Canadian chemical and pipeline company, that 
demonstrated that a rate of raw gas buildup in a small residence (300 
square feet) would have to be about 60 cubic feet per hour to reach an 
ignitable level in five hours. This allows a five hour period for 
someone to discover the gas release before the ignitable level is 
reached. A bypass-type EFV allows 20 cubic feet of gas per hour. 
Therefore, natural gas that is passing through an EFV with a bypass 
would take several hours to accumulate to the ignitable range in a 
building.
    Response--RSPA has been concerned that excavators could repair a 
service line break equipped with an EFV with a bypass feature, the EFV 
would automatically reset, and service would be restored without the 
operator knowing that the line had been damaged. Consequently, gas 
could then pass into and accumulate in a residence where the pilot 
light on a gas appliance had been extinguished during the service line 
break.
    RSPA was also concerned that restoration of gas service with 
unvented appliances would cause a rapid buildup of the gas/air mixture 
to an ignitable level. Commenters have posed circumstances under which 
such a buildup could occur. However, in response to its questions about 
this problem, RSPA did not receive any information that such an 
incident has actually occurred. Furthermore, an EFV manufacturer and 
AGA have assured RSPA that bypass-type EFVs operate properly to avoid 
unintended gas buildup within a building. An operator with 20,000 
installed bypass-type EFVs stated that bypass gas from a tripped EFV 
had never caused or contributed to an unsafe situation on its system. 
Other operators made comparable statements. The NOVA study, described 
above, further allays RSPA's concern. Therefore, based on the record in 
this rulemaking, RSPA accepts the premise that EFVs with a bypass 
feature are safe.
    RSPA also finds acceptable the Joint Commenters' recommendation to 
limit gas flow to 20 cubic feet per hour for bypass-type EFVs and to 
0.4 cubic feet per hour for positive shutoff-type EFVs. Because EFVs 
with positive shutoff features were proposed in the NPRM, RSPA did not 
propose EFV flow limits. However, RSPA agrees that the limits 
recommended by the Joint Commenters are reasonable and feasible design 
requirements.
    Accordingly, the final rule allows either bypass or positive 
shutoff EFVs. Closure flow rates will be limited to 20 cubic feet per 
hour for the bypass-type EFV and 0.4 cubic feet per hour for the 
positive shutoff EFV.
    Proposed Section 192.381(b)(4)--(installation testing)--RSPA 
proposed that upon original installation of an EFV and each time the 
meter is removed or replaced, the EFV be tested to determine if it 
closes automatically. The Joint Commenters' recommendation deleted the 
requirement.
    Comments--All 37 commenters on this proposed requirement asked that 
it be deleted. Most commenters stated that the test would require that 
the service line be disconnected from the meter set, the service valve 
at the meter opened, and gas vented to the atmosphere to trip the EFV. 
Many commenters said that venting of the gas near the residence, or 
inside the residence when the meter is indoors, would be hazardous and 
would needlessly release methane into the atmosphere contrary to the 
goals of the Clean Air Act.
    An EFV user stated that it does not test the EFV when replacing 
meters. This commenter stated that it replaces one-tenth of its meters 
annually and provided RSPA a summary of the steps involved in testing 
an EFV when a meter is replaced on an existing service. This commenter 
further stated it would take a two person crew a full day to test an 
EFV, resulting in substantial cost with no corresponding benefit. The 
American Public Gas Association (APGA) commented that the proposed 
testing would add significantly to the costs of using EFVs with no 
corresponding safety benefits and noted that these costs were not 
included in the cost/benefit analysis.
    Several other commenters also noted that this proposed requirement 
had not been covered in the cost/benefit analysis and provided data on 
the costs that would be incurred for such tests. AGA estimated that 3 
million services have meters removed each year, so that the tests could 
cost $100 million per year, doubling RSPA's estimated installation cost 
of $20 per EFV (with bypass feature). These same commenters contended 
that testing positive shutoff EFVs would cost even more.
    AGA and other commenters concluded that such tests would require 
removing the service regulator or

[[Page 31455]]

installing a fitting to allow gas to be vented upstream of the service 
regulator because the flow of gas passing through a service regulator 
may be too small to cause the EFV to trip. These commenters said that 
such a fitting would invite a resident to bypass the meter and steal 
gas.
    The TPSSC voted 8 to 2 that no in-service testing of an EFV be 
required.
    Response--Based on the comments about problems and costs of 
installation testing, the final rule will not require an operator to 
test the EFV when the EFV is installed or when the meter is removed or 
replaced. However, the requirement that the EFV must be manufactured 
and tested to an industry specification or manufacturer's written 
specification to ensure that the EFV functions properly up to the rated 
maximum operating pressure will certainly require random sample testing 
at the manufacturer's plant. Such sample testing is routinely conducted 
for all other valves in accordance with manufacturing standards.
    Proposed Section 192.381(b)(5)--(automatic closure)--RSPA proposed 
that an EFV must close automatically if the service line is severed or 
if the customer's meter, regulator, or service valve is sheared off. 
The Joint Commenters' recommendation did not include such a 
requirement.
    Comments--All seventeen commenters on this proposed requirement 
argued that it should be deleted. Most commenters stated that operators 
cannot guarantee that an EFV will perform as designed and warranted by 
the manufacturer. One commenter said that it would be difficult to 
comply with such a requirement because EFVs often fail to activate (due 
to fluid friction) in longer service line lengths of \1/2\-inch pipe. 
Also, even if the meter set is sheared off, the flow rate may not 
exceed the EFV activation flow rate because the pipe may be squeezed 
off at the point where it is sheared, or because there are other 
restrictions in the line.
    One EFV user stated that costs for assuring that an EFV closes 
automatically would approach $1,000 per installation. This commenter 
reasoned that an EFV is intended to help reduce the effects of dig-ins 
on a service line in the area of the street, where most excavation 
takes place, and requiring the EFV to do more than intended will 
increase costs.
    The TPSSC voted 7 to 3 that the proposed requirement be changed so 
that an EFV ``be designed to close automatically if the service line is 
ruptured downstream of the valve.''
    Response--RSPA agrees with the commenters that flow rate may not 
always exceed an EFV's activation flow rate because a long service line 
could cause excessive pressure drop, or a line could be squeezed off at 
the point where it is sheared, or there could be other restrictions in 
the line. Therefore, RSPA is not including proposed Sec. 192.381(b)(5) 
in the performance standards. However, the final rule (Sec. 192.381(c)) 
requires that an EFV be manufactured according to an industry 
specification or manufacturer's written specification that will 
establish shutoff requirements for conditions comparable to a service 
line being severed or a meter set being sheared off.
    Proposed Section 192.381(b)(6)--(sizing)--RSPA proposed that an EFV 
be sized to close within 10 percent of the rated flow specified by the 
manufacturer. The Joint Commenters recommended a closure rate not less, 
and not more than 50 percent higher, than the manufacturer's specified 
closure flow rate.
    Comments to NPRM--The 32 commenters objected to this requirement. 
Most commenters suggested that the proposed 10 percent tolerance be 
raised to 50 percent because EFVs are not precision instruments. Some 
commenters suggested a 25 percent tolerance. Most commenters said that 
EFVs with 10 percent tolerance are not commercially available and would 
be significantly more expensive. GASAC also opposed the requirement as 
excessive.
    AGA provided exhaustive information showing that EFVs with a 10 
percent tolerance are not commercially available and may not be 
possible to mass produce. AGA suggested a 50 percent tolerance and 
cited a Gas Research Institute (GRI) study regarding EFV performance 
repeatability. In 1985, GRI tested seven EFV models and found that 
closure flows of a single copy were repeatable within a range of 6.4 
percent to 20.8 percent, whereas closure flows between two arbitrary 
copies of the EFVs were repeatable within the range of 15.4 percent and 
87.9 percent. None of these models would have met the RSPA proposed 
requirements. AGA provided an EFV manufacturer's graphs showing that 
none of the currently available EFVs tested by that manufacturer closed 
within 10 percent of the rated closure.
    Comments on Joint Commenters' recommendation--A member of the Joint 
Commenters said its analysis of service ruptures found that EFVs could 
close as much as 50 percent over specified closure flow and still 
reliably close in the type of accident EFVs are meant to address. Three 
other commenters agreed with the Joint Commenters' recommendation.
    The TPSSC voted 7 to 4 that the rule specify that an EFV must close 
no lower than its rated flow and not more than 50 percent above rated 
closure flow.
    Response--Although no EFV is currently available at an acceptable 
cost that will conform to a 10 percent tolerance, RSPA believes that 
distribution operators must have a specified closure range for an EFV 
that is reliable. The requirement that an EFV activate at, or 50 
percent above, a specified flow level provides an acceptable closure 
range in accordance with currently available EFVs. Accordingly, RSPA 
will require an EFV be sized to close at or 50 percent above the rated 
closure flow rate specified by the manufacturer.
    Proposed Section 192.381(c)--(flow rate verification)--RSPA 
proposed that the operator verify the manufacturer's rated flow for the 
EFV by testing at a pressure of 10 psig for the gas to be transported 
in the service line. The Joint Commenters recommended that the 
manufacturer certify the EFV meets the manufacturer's written 
performance specifications, rather than place this responsibility on 
the operator.
    Comments to NPRM--Thirty six commenters responded to RSPA's 
proposed requirement. Virtually all commenters objected to any operator 
responsibility for testing and suggested the requirement be deleted. 
Most commenters contended that operators cannot guarantee the 
performance of an EFV, but should be able to rely on the manufacturer 
to certify that EFVs meet the applicable standards--the approach 
allowed for other valves used in gas distribution systems. An EFV 
manufacturer also agreed that it should be the manufacturer's 
responsibility to test and certify EFVs. Most commenters stated that 
the proposed requirement would significantly increase an operator's 
costs.
    Comments on Joint Commenters' recommendation--An industry 
association agreed with the recommendation to allow an operator to rely 
on the manufacturer's certification that EFVs meet performance 
standards rather than have the operator test each EFV. The association 
pointed out that RSPA allows such a procedure under Sec. 192.145.
    Response--RSPA agrees with the commenters that the flow rate 
verification test should be an EFV manufacturer's responsibility, not 
the operator's. Thus, the final rule requires that an EFV be 
manufactured and tested by the manufacturer according to an industry 
specification, or

[[Page 31456]]

manufacturer's written specification to ensure that each valve will 
perform specified minimum functions. This requirement should lead to a 
random EFV testing program by the manufacturer, similar to testing for 
other system valves. Currently, certain valves (cast iron and plastic) 
are installed that meet the specified manufacturing tests in 
Sec. 192.145. All other valves must be manufactured according to 
specifications in American Petroleum Institute (API) Standard 6D, which 
also requires random testing by the manufacturer.
    Proposed Section 192.381(d)--(replacement)--RSPA proposed that if 
an EFV does not close automatically during installation testing or when 
the service line is severed, it must be replaced with an EFV that 
closes as required. The Joint Commenters' approach would remove any 
requirement to assure that an EFV closes after installation.
    Comments--None of those commenting on RSPA's proposal was entirely 
satisfied with it. Seven commenters suggested changes that included 
permitting the operator the option to repair or replace an EFV that 
doesn't close. These commenters further proposed exempting a location 
from the installation requirement after two EFVs do not perform 
properly at that location.
    One operator questioned what constitutes satisfactory closure by 
explaining that minor accumulations of dust and dirt can interfere with 
an absolute 100 percent shutoff. This commenter said that RSPA should 
conduct additional studies to ascertain what long-term performance 
characteristics can be expected and include acceptable criteria in the 
rulemaking.
    Eight commenters said the requirement was not needed or questioned 
the apparent intent to require the operator to keep replacing an EFV 
until one performs as required. Several said that the requirement 
assumed that an EFV's failure to close is always the valve's fault. 
Commenters explained that many factors influence the operation or 
performance of an EFV, including changes in operating pressures and the 
type of gaseous mixtures flowing through the service line. They 
suggested the practical approach would be to allow the utility to 
repair and replace an EFV at its own discretion as it does with other 
valves in its system.
    Response--RSPA's proposed requirement that an operator replace an 
installed EFV if it fails during installation testing or during a 
service line break, is no longer applicable since on-site testing and 
mandatory EFV installation are not being required in this final rule. 
Instead, an EFV must be manufactured and tested by the manufacturer 
according to an industry specification or manufacturer's written 
specification to ensure that the valve will function properly. 
Furthermore, replacement or removal of a defective EFV will be left to 
agreement between the customer and operator.
    Section 192.381(e)--(manufacturing specifications)--RSPA proposed 
that each EFV must be manufactured in accordance with written 
specifications that assure the EFV meets the manufacturer's published 
pressure and flow rate criteria. The Joint Commenters recommended that, 
instead, an EFV be manufactured and tested by the manufacturer 
according to a written specification to ensure that the EFV will 
function properly up to the maximum rated operating pressure and at all 
temperatures reasonably expected. The Joint Commenters further 
recommended that an EFV not close when pressures are below the 
manufacturer's minimum pressure.
    Comments--Fourteen of the fifteen commenters responding to RSPA's 
proposed requirement were dissatisfied with the wording and recommended 
changes. These commenters stated that this provision appeared to shift 
responsibility for quality assurance from the manufacturer to the gas 
distribution operator who cannot assure that the manufacturer will 
produce valves meeting the manufacturer's published pressure and flow 
rate criteria. Commenters further stated that because of liability 
concerns there should be an industry EFV standard by which the valves 
should be manufactured. APGA also argued that manufacturers, not gas 
distribution operators, should be responsible for assuring that EFVs 
meet the necessary performance criteria.
    Response--RSPA agrees that the proposed requirement was unclear as 
to who would be responsible for assuring that an EFV meets the 
specified performance requirements. Accordingly, the final rule 
clarifies that an EFV will have to be manufactured and tested by the 
manufacturer according to an industry specification or manufacturer's 
written specification to ensure that each valve meets the specified 
minimum performance standards.
    Proposed Section Sec. 192.381(f)--(service line capacity)--RSPA 
proposed that service line capacity must exceed the EFV manufacturer's 
flow rating by 50 percent. The Joint Commenters' approach did not 
include a similar requirement.
    Comments on NPRM--Thirty three commenters responded to this 
proposed requirement. Five commenters said that maintaining a flow rate 
at least 50 percent over the rating of the EFV would severely restrict 
an operator and increase costs. These commenters explained that such a 
high flow rate would, in many cases, require the installation of 
service lines larger in diameter than required for a customer's load 
and also preclude the insertion of plastic tubing. These persons 
recommended reducing the flow rate margin to 25 percent.
    Most commenters opposed establishing arbitrary excess flow 
capacity. These commenters stated that the sizing of service lines is 
the operator's responsibility and that many factors must be considered, 
such as costs, current and future loads, the possibility of future 
insertions, and future maintenance requirements.
    Response--RSPA agrees that a requirement to design a service line 
with excess capacity is not necessary for an EFV to function properly 
and would add unnecessary expense. Thus, the final rule does not 
require that service line capacity exceed the EFV manufacturer's flow 
rating by 50 percent. This approach is consistent with Part 192, which 
does not require installation of service lines larger than required to 
meet the customer's load.
    Proposed Section 192.381(g)--(Marking)--RSPA proposed that each 
service line with an EFV be physically marked or labeled in the field, 
so that the label would be readily visible to gas company employees.
    Comments on NPRM--Twelve commenters said that requiring service 
lines with EFVs to be identified is unnecessary and is of little 
benefit. One commenter, currently using EFVs and marking those service 
lines, said it does not believe that marking should be required. 
Several commenters stated that marking service lines is futile due to 
customers painting the meter set, weather deterioration, and vandalism. 
A few commenters suggested that the operator have the option to mark or 
record the location of these valves. However, eight commenters 
supported the requirement, saying it is a good safety practice for gas 
company operator personnel, when arriving at a residence, to know if an 
EFV is installed in that service line.
    Comments on Joint Commenters' Recommendation--The Joint Commenters' 
recommendation did not include a requirement to mark services in the 
field. An industry association supported the Joint Commenters' approach 
and further recommended that

[[Page 31457]]

the operator be allowed the option to mark services in the field or 
record EFV installation on its maps and records.
    Response--RSPA believes it is helpful for operating personnel to 
know if an EFV is installed in a service line. In a service outage or 
emergency, service personnel arriving at a residence might respond 
differently depending on whether or not an EFV is installed. For 
example, if service personnel find that a service line has been severed 
and the line is marked or otherwise identified as having an EFV, 
service personnel should recognize that the small amount of gas 
escaping from the severed line is from an EFV with a bypass feature and 
not from a pinched service line that could suddenly release a hazardous 
flow of gas. With this knowledge, service personnel can initiate 
correct repair procedures.
    Accordingly, the rule will require that an operator must mark or 
otherwise identify the presence of an EFV in the service line.
    Proposed Section 192.381(h)--(Contaminants)--RSPA proposed that EFV 
installation not be required on a service line where the operator can 
demonstrate that contamination in the gas stream will cause an EFV to 
malfunction. The Joint Commenters' approach eased the operator's burden 
of proof by allowing the operator to document, rather than demonstrate, 
an unsatisfactory level of contamination.
    The Joint Commenters also recommended that EFV installation not be 
required where the EFV would interfere with operation and maintenance 
activities, such as blowing liquids from the line.
    Comments on NPRM--Twenty-four commenters supported the proposal to 
except EFV installation where prior experience indicates contaminants 
will cause a malfunction. Several commenters stated, however, that it 
is unclear how an operator could make such a demonstration. NTSB said 
RSPA should state the requirements necessary to claim the exemption. 
Several commenters said they hoped that an operator would not have to 
install an EFV and wait for it to fail before being able to demonstrate 
that contaminants should preclude installation. Two commenters argued 
that if an operator has experience with clogging of valves, regulators, 
or meters from liquids or solids in certain areas of its system, such 
experience should be sufficient to demonstrate that an EFV should not 
be installed on that part of the system.
    An EFV manufacturer agreed that an EFV should not be installed 
where contaminants would interfere with the proper operation of an EFV, 
but based on its experience felt it unlikely that many systems have 
sufficient contaminants to cause an EFV to malfunction. GASAC commented 
that requests for an exemption should be subject to public disclosure 
and a formal review process to prevent unwarranted exemptions.
    Comments on Joint Commenters' recommendation--AGA argued that the 
operator should determine whether to use EFVs in contaminated areas. 
AGA said a company might cite previous experience with service lines 
plugging with liquids or solids, plugging of other valves or service 
regulators, or knowledge of liquids or solid debris in certain parts of 
the system to justify not installing EFVs.
    Another commenter said that iron oxide rouge from steel pipe mixed 
with tiny amounts of compressor fluids forms a sticky residue and 
prevented early model EFVs from successfully resetting following 
closure. The commenter said it is likely that no EFV on the market 
today is robust enough to withstand such contaminants and operate 
properly for the minimum expected life of 50 years estimated in the 
NPRM.
    Response--RSPA agrees that an EFV is not recommended on a service 
line where the operator has prior experience with contaminants in the 
gas stream that could interfere with the EFV, cause loss of service to 
a residence, or cause an operator to incur undue expense in removing an 
inoperative EFV. An operator should, based on its previous history of 
service line or equipment problems from contaminants, decide whether it 
is appropriate to install an EFV. An operator should also consider if 
an EFV installed on a service line could interfere with the operator's 
operation and maintenance procedures.

Regulatory Notices and Analyses

Executive Order 12866 and DOT Regulatory Policies and Procedures

    This final rule is a significant regulatory action under Executive 
Order 12866. Therefore, it was reviewed by the Office of Management and 
Budget. In addition, the final rule is significant under DOT's 
regulatory policies and procedures (44 FR 11034; February 26, 1979) 
because it concerns a matter of substantial interest to the public and 
Congress.

Cost/Benefit Analysis (EFV--Performance Standards)

    Since the final rule does not require mandatory installation of 
EFVs, the performance requirements of this rule will not impact gas 
distribution systems not currently installing EFVs unless they begin 
installing EFVs. This rule will impact manufacturers of EFVs. As 
previously mentioned, OPS will be initiating a separate rulemaking to 
propose that customers be notified that EFVs are available for 
installation and will be installed at customer expense. This means that 
all gas distribution systems may soon be installing EFVs, and, thus, 
may be impacted by the new EFV performance standards.
    The new EFV performance standards will help ensure that gas 
distribution companies that currently install EFVs, as well as those 
that begin to install EFVs on their own or because of a new 
notification rule, properly install these EFVs. Furthermore, these 
standards, by helping to ensure that newly installed EFVs are 
manufactured to function properly (e.g., close when they are supposed 
to and not close when they are not supposed to), will reduce the cost 
of improper closure to both gas distribution system operators and the 
general public. The standards will also help keep substandard valves 
from entering the marketplace, thereby providing some assurance of 
reliability to both operators and customers. As a further result of 
these standards, reliable EFVs installed on compatible service lines 
will help mitigate the consequences of incidents on service lines.
    The cost/benefit study accompanying this rule estimates and 
compares the benefits and costs of the EFV performance standards to 
determine whether the standards, taken as a whole, would be cost 
beneficial. This study estimates the expected benefits and costs of 
installing one EFV and uses these estimates to calculate a benefit/cost 
ratio. This approach yields the same benefit/cost ratio as an approach 
considers the number of EFVs installed in each year, but is less 
complicated and cumbersome, since it does not require the estimation of 
(1) the number of services expected to be renewed each year, (2) the 
number of new services expected to be installed each year, and (3) the 
number of existing services that will be discontinued each year.
    The primary sources of EFV data used in the analysis were (1) the 
written submissions to the Docket for this rulemaking made by gas 
distribution companies, EFV manufacturers, and other interested parties 
and (2) direct contacts with gas distribution companies, EFV 
manufacturers, and other interested parties.
    The pipeline incident data used in this analysis was taken 
primarily from the incident and annual report submissions made to OPS 
by gas distribution companies. These

[[Page 31458]]

submissions are required under the Federal pipeline safety regulations.
    All dollar figures in the study are given in nominal dollars, 
unless otherwise indicated. Where deflation of nominal dollar figures 
has been performed, the Producer Price Index, All Commodities, with 
1993 as the base, has been used.
    As summarized below, benefits, costs, and net benefits were 
developed for (1) the standards for EFV installation, (2) marking 
requirements, and (3) the performance requirements. The complete 
Benefit/Cost Analysis for EFV Performance Standards, dated August 1995, 
is available in the Docket.

Standards for EFV Installation

    The final rule requires that an EFV installed on a single-family 
residential gas service that always operates at 10 psig or greater (1) 
must be rated by the manufacturer for use at the pressure and flow rate 
anticipated on the service line and (2) must meet the applicable 
requirements of Subparts B and D of Part 192. The final rule also 
recommends that an installed EFV be placed as near as practical to the 
main. Although this rule specifies standards for EFV installation, the 
installation of EFVs is not mandatory. However, if an EFV is installed, 
the regulatory standards will help ensure the EFV performs as expected 
and protects the maximum length of the most vulnerable portion of a 
service line.
    The standards for EFV installation appear to be consistent with 
current industry practice. Consequently, the benefits, costs, and net 
benefits of the requirements are all expected to be $0 per EFV per 
year.

Marking Requirements

    The new marking requirement will enable gas distribution system 
operating and service personnel to know if a service line has an EFV 
installed when responding to a service outage or other service line 
call. This will make it possible for the personnel to safely initiate 
correct repair procedures. The new marking requirement is expected to 
reduce deaths and injuries to gas distribution system personnel, and to 
reduce damage to the system and nearby property.
    The requirement to mark or otherwise identify services with EFVs is 
consistent with current industry practice. As a consequence, the 
benefits, costs, and net benefits are all expected to be $0 per EFV per 
year.

Performance Requirements

    The final rule sets performance requirements for all newly 
installed EFVs on single-family residential services operating at 10 
psig or greater. These performance requirements are to be ensured 
through design, manufacturing, and testing by EFV manufacturers in 
accordance with an industry specification or with the manufacturer's 
written specifications.
    The performance requirements will help ensure the reliability of 
EFVs. Greater reliability will result in (1) the replacement of fewer 
EFVs by gas distribution systems and (2) an increase in the number of 
EFV actuations when there are catastrophic service line breaks. The 
primary benefit of the new performance requirements will be an 
increased average reliability of the EFVs on the market. This assumes 
that all EFVs currently on the market are not fully consistent with the 
new requirements, which appears to be the case. A secondary benefit 
will be the assurance that the quality of EFVs will not degrade (with 
respect to the performance characteristics covered by the new 
performance requirements) in the future.
    The new performance requirements for EFVs cover (1) rated maximum 
operating pressure, (2) the impact of external temperature, (3) sizing, 
(4) reduction in gas flow upon closure, and (5) inappropriate closure. 
The requirements for rated maximum operating pressure, the impact of 
external temperature, and sizing appear to be consistent with current 
industry practice. The benefits of the new performance requirements are 
expected to be between $15,675 and $1,254 per year. The costs are 
expected to be $0 per year. Consequently, the net benefits are expected 
to be between $15,675 and $1,254 per year.
    The net benefits calculated for the performance requirements do not 
include (1) the costs related to the redesign of EFVs, (2) the full 
monetary value of the benefits accruing to gas distribution companies 
that currently install EFVs, and (3) the monetary value of the benefits 
that will accrue to gas distribution companies that install EFVs in the 
future.

Present Value of the Net Benefits

    The net benefits for the new performance requirements are the sum 
of the net benefits of (1) EFV installation standards, (2) the marking 
requirements, and (3) the EFV performance requirements. Since the net 
benefits for the EFV installation standards and for the marking 
requirements are expected to be greater than $0 per year, while the net 
benefits for the new performance requirements are expected to be 
between $15,674 and $1,254 per year, the total net benefits for the EFV 
requirements specified in the final rule will be, at most, greater than 
$15,674, and, at least, greater than $1,254 per year. Discounted over 
50 years (the life of an EFV assumed by OPS) using a 7 percent discount 
rate, the present value of the total net benefits is expected to be, at 
most, greater than $223,768, and, at least, greater than $17,901. Since 
costs are $0, their present value is also $0 and the cost-to-benefit 
ratio is 0 at both the upper and lower bounds of the benefits.

Conclusion

    The positive present value of the expected net benefits, as well as 
the cost-to-benefit ratio of 0 at both the upper and lower bounds on 
the benefits, indicate that the performance standards presented in the 
final rule will be cost beneficial.

Regulatory Flexibility Act

    Based on costing assumptions discussed in the Cost/Benefit 
Analysis, this rule will not have an undue impact on small operators. 
Therefore, I certify under section 605 of the Regulatory Flexibility 
Act that the action will not have a significant economic impact on a 
substantial number of small entities.

E.O. 12612

    This rulemaking action will not have substantial direct effects on 
states, on the relationship between the federal government and the 
states, or on the distribution of power and responsibilities among the 
various levels of government. Therefore, in accordance with E.O. 12612 
(52 FR 41685; October 30, 1987), RSPA has determined that this final 
rule does not have sufficient federalism implications to warrant 
preparation of a Federalism Assessment.

National Environmental Policy Act

    RSPA has analyzed this action for purposes of the National 
Environmental Policy Act (42 U.S.C. 4321 et seq.) and has determined 
that this action would not significantly affect the quality of the 
human environment. An Environmental Assessment and a Finding of No 
Significant Impact are in the docket.

List of Subjects in 49 CFR Part 192

    Pipeline safety, Reporting and recordkeeping requirements.
    In consideration of the foregoing, Part 192 is amended as follows:

PART 192--[AMENDED]

    1. The authority citation for Part 192 continues to read as 
follows:

[[Page 31459]]

    Authority: 49 U.S.C. 5103, 60102, 60104, 60108, 60109, 60110, 
60113 and 60118; 49 CFR 1.53.
* * * * *
    2. Part 192 is amended by adding Sec. 192.381 to subpart H to read 
as follows:

Sec. 192.381  Service lines: Excess flow valve performance standards.

    (a) Excess flow valves to be used on single residence service lines 
that operate continuously throughout the year at a pressure not less 
than 10 psig must be manufactured and tested by the manufacturer 
according to an industry specification, or the manufacturer's written 
specification, to ensure that each valve will:
    (1) Function properly up to the maximum operating pressure at which 
the valve is rated;
    (2) Function properly at all temperatures reasonably expected in 
the operating environment of the service line;
    (3) At 10 psig:
    (i) Be sized to close at, or not more than 50 percent above the 
rated closure flow rate specified by the manufacturer; and
    (ii) Upon closure, reduce gas flow--
    (A) For an excess flow valve designed to allow pressure to equalize 
across the valve, to no more than 5 percent of the manufacturer's 
specified closure flow rate, up to a maximum of 20 cubic feet per hour; 
or
    (B) For an excess flow valve designed to prevent equalization of 
pressure across the valve, to no more than 0.4 cubic feet per hour; and
    (4) Not close when the pressure is less than the manufacturer's 
minimum specified operating pressure and the flow rate is below the 
manufacturer's minimum specified closure flow rate.
    (b) An excess flow valve must meet the applicable requirements of 
Subparts B and D of this part.
    (c) An operator must mark or otherwise identify the presence of an 
excess flow valve in the service line.
    (d) An operator should locate an excess flow valve beyond the hard 
surface and as near as practical to the fitting connecting the service 
line to its source of gas supply.
    (e) An operator should not install an excess flow valve on a 
service line where the operator has prior experience with contaminants 
in the gas stream, where these contaminants could be expected to cause 
the excess flow valve to malfunction or where the excess flow valve 
would interfere with necessary operation and maintenance activities on 
the service, such as blowing liquids from the line.

    Issued in Washington, DC, on June 14, 1996.
D.K. Sharma,
Administrator, Research and Special Programs Administration.
[FR Doc. 96-15564 Filed 6-19-96; 8:45 am]
BILLING CODE 4910-60-P

Complete official Federal Register PDF

FR Doc. 96-15299 Grade Crossing Signal System Safety
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31802-31812]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15299]

[[Page 31801]]

_______________________________________________________________________

Part XI

Department of Transportation

_______________________________________________________________________

Federal Railroad Administration

_______________________________________________________________________

49 CFR Part 234

Grade Crossing Signal System Safety; Interim Final Rule

Federal Register / Vol. 61, No. 120 / Thursday, June 20, 1996 / Rules 
and Regulations

[[Page 31802]]

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

49 CFR Part 234

[FRA Docket No. RSGC-5; Notice No. 8l
RIN 2130-AA97

Grade Crossing Signal System Safety

AGENCY: Federal Railroad Administration (FRA), Department of 
Transportation (DOT).

ACTION: Interim final rule amendments.

-----------------------------------------------------------------------

DATES: This interim final rule is effective August 19, 1996.
    Written comments concerning this rule must be filed no later than 
July 22, 1996.

SUMMARY: FRA is amending the final rule requiring that railroads comply 
with specific maintenance, inspection, and testing requirements for 
active highway-rail grade crossing warning systems. The final rule 
being amended also requires that railroads take specific and timely 
actions to protect the traveling public and railroad employees from the 
hazards posed by malfunctioning highway-rail grade crossing warning 
systems. The amendments issued today are technical corrections which 
clarify the rule which was published on September 30, 1994.

FOR FURTHER INFORMATION CONTACT: William Goodman, Staff Director, 
Signal and Train Control, Office of Safety, FRA, 400 Seventh Street, 
S.W. Washington, D.C. 20590 (telephone 202-366-2231), or Mark Tessler, 
Office of Chief Counsel, FRA, 400 Seventh Street, S.W., Washington, 
D.C. 20590 (telephone 202-366-0628) (e-mail address: 
[email protected]) .

SUPPLEMENTARY INFORMATION:

Background

    On September 30, 1994, FRA published a final rule (59 FR 50086) 
requiring that railroads comply with specific maintenance, inspection, 
and testing requirements for active highway-rail grade crossing warning 
systems. The final rule also requires that railroads take specific and 
timely actions to protect the traveling public and railroad employees 
from the hazards posed by malfunctioning highway-rail grade crossing 
warning systems.
    Because maintenance, inspection, and testing and timely response to 
warning device malfunctions is a new regulatory field, actual 
experience under the new final regulations is invaluable in determining 
where the regulations are working and where they need to be clarified 
or revised. Shortly after the regulations were issued, an FRA Technical 
Resolution Committee (TRC) met to discuss the regulations, their 
interpretation and implementation. Included in the TRC were FRA signal 
and train control specialists from across the country along with 
headquarters staff. Representatives from labor and management (which 
had earlier in the regulatory process submitted a proposal which became 
the basis for the maintenance and inspection portion of the final rule) 
were invited to attend certain sessions as non-voting members to offer 
their perspective and expertise to the group, together with 
representatives of two States active in the State Participation 
Program. Although the purpose of this TRC was to develop the 
appropriate application and interpretation of the final rule, the 
discussion, together with other lessons learned during implementation, 
also indicated the need to clarify certain portions of the regulatory 
text. Additionally, the American Short Line Railroad Association, the 
Brotherhood of Railroad Signalmen, and the Association of American 
Railroads jointly filed a Petition for Reconsideration with FRA 
requesting that FRA stay enforcement of certain sections of the final 
rule (Secs. 234.215 and 234.223) pending further consideration of those 
provisions. Subsequent to the joint filing, FRA issued and Interim 
Policy Manual addressing, among others, the issues and questions raised 
by the petitioners. FRA granted the petition for reconsideration 
although it did not agree to stay enforcement since enforcement issues 
had been addressed in the Interim Policy Manual. This notice is in part 
a response to the joint petition for reconsideration.
    FRA has not provided prior notice and request for public comment 
prior to making the amendments contained in this rule. FRA has 
concluded that such notice and comment are impracticable, unnecessary 
and contrary to the public interest under 5 U.S.C. 553 since FRA is 
either making minor technical changes in response to the past year's 
operational experience of railroads and employees working under the 
provisions of the final rule or the amendments are purely 
``housekeeping''. Additionally, all issues addressed by these 
amendments were previously the subject of detailed notice and extensive 
comment in the development of the initial final rule in this 
proceeding. However, interested parties may comment on this rule and 
FRA will consider those comments. For this reason, FRA has issued this 
as an interim final rule so that it can take effect while any comments 
are being considered. If comments persuade FRA that further amendments 
are necessary, it will address them in a subsequent notice. As noted 
above, comments must be submitted no later than July 22, 1996.

Section-by-Section Amendments

Sec. 234.1 (``Scope'')

    In order to correct a typographical error, the first sentence of 
this section is being amending by adding ``for'' between ``testing 
standards'' and ``highway-rail grade crossing.''

Sec. 234.3 (``Application'')

    This section is not being changed, however, despite the attempt in 
the preamble to the final rule to fully explain the type of rail 
operations which are covered by these regulations, based on the number 
of questions that have been posed, it has become clear that we were not 
entirely successful. As stated in the rule, this part applies to all 
railroads except (1) a railroad that exclusively operates freight 
trains only on track which is not part of the general railroad system 
of transportation, (2) rail rapid transit operations conducted over 
track that is used exclusively for that purpose and that is not part of 
the general railroad system of transportation, or (3) a passenger 
railroad that operates trains only on track inside an installation that 
is insular. Part 209 of title 49 of the Code of Federal Regulations 
defines a railroad as any form of non-highway ground transportation 
that runs on rails or electromagnetic guideways, excluding rapid 
transit operations not connected to the general railroad system of 
transportation. The following discussion addresses specific types of 
rail operations and whether this rule applies to that operation.
    Rail rapid transit--this part does not apply to rail rapid transit 
operations conducted over track that is used exclusively for that 
purpose and that is not part of the general railroad system of 
transportation.
    Rail passenger operations--this part does apply to passenger 
railroad operations if any of the following exists on the line of 
railroad: (a) a public highway-rail crossing that is in use; (b) an at 
grade rail crossing that is in use; (c) a bridge over a public road or 
waters used for commercial navigation; (d) or its operations are within 
30 feet of those of any other railroad. If any of these conditions 
exist, all grade crossings over which the railroad operates, both 
public and private crossings, are subject to this rule. It is important 
to note that the fact that a passenger railroad is not

[[Page 31803]]

connected to the general railroad system does not in itself affect a 
railroad's duty to comply with this part. An analysis must be made as 
to the presence of the above mentioned factors.
    Rail freight operations--this part applies to all freight railroads 
which are part of the general railroad system of transportation. FRA's 
regulations generally exclude railroads whose entire operations are 
confined to an industrial installation, i.e., ``plant railroads'' such 
as those in steel mills that do not go beyond the plant's boundaries. 
However, even where a railroad operates outside of the general system, 
other railroads that are part of that system may have occasion to enter 
the first railroad's property. In that case the plant railroad would 
have to meet FRA's highway-rail grade crossing warning system standards 
if a general system railroad operated over the grade crossing. These 
regulations do not apply to a freight carrying railroad (and the grade 
crossings over which it operates ) which is not part of the general 
railroad system of transportation. Both public and private crossings 
that general system railroads operate over are covered by this part.

Sec. 234.5 (``Definitions'')

    A benefit of reviewing FRA's and railroads' experience with this 
new rule is that ``fine tuning'' can be accomplished based on real 
world experience. Shortly after the rule was implemented, it became 
clear that the rule did not adequately address those cases in which a 
portion of a warning system operated correctly while other portions or 
components did not perform as intended. FRA is revising the definition 
of ``activation failure'' and is newly defining ``partial activation'' 
to address those situations.
    The definition of ``activation failure'' is being revised to 
provide that activation failure includes the situation in which a grade 
crossing signal system does not indicate the approach of a train within 
the meaning of this paragraph if--(1) more than 50% of the flashing 
lights (not gate arm lights) on any approach lane to the crossing are 
not functioning as intended, or (2) in the case of an approach lane for 
which two or more pairs of flashing lights are provided, there is not 
at least one flashing light pair operating as intended. Back lights on 
the far side of the crossing are not considered in making these 
determinations. FRA believes that if more than half of the flashing 
lights directed to a motorist's approach are not operating properly, a 
motorist does not receive sufficient warning that a train is 
approaching. Similarly, if a motorist's approach is normally provided 
with one or more pairs of alternately flashing lights, if at least one 
pair is not operating properly, sufficient warning is not being 
provided.
    The definition of ``appropriately equipped flagger'' is being 
revised to leave greater discretion with railroads in determining the 
type of clothing to be worn by flaggers. The definition contained in 
the final rule was based on the Federal Highway Administration's 
standards pertaining to flaggers and flagging equipment for highway 
traffic control contained in the Manual on Uniform Traffic Control 
Devices (MUTCD). FRA has received information from manufacturers that 
the requirement for nighttime visibility of 1000 feet is not possible 
to meet under all conditions and therefore manufacturers can not 
certify to a purchaser that the clothing would comply with the 
regulatory requirement. FRA is thus deleting the 1000 feet requirement. 
While it is revising its requirements from those standards for highway 
construction flagging contained in the MUTCD, FRA recommends that 
railroads be aware of the standards and follow them to the greatest 
extent possible. Copies of the latest MUTCD provisions regarding 
flagging will be available from FRA, as well as FHWA, as changes are 
made in this area.
    FRA is clarifying this provision by redefining ``appropriately 
equipped flagger'' as ``a person other than a train crewmember who is 
equipped with a vest, shirt, or jacket of a color appropriate for 
daytime flagging such as orange, yellow, strong yellow green or 
fluorescent versions of these colors or other generally accepted high 
visibility colors. For nighttime flagging, similar outside garments 
shall be retro reflective. Acceptable hand signal devices for daytime 
flagging include `` STOP/SLOW'' paddles or red flags. For nighttime 
flagging, a flashlight, lantern, or other lighted signal shall be 
used.''
    Please note that this definition is also being clarified by 
replacing the ``and'' in ``STOP/SLOW paddles and red paddles'' with 
``or''. Additionally, this provision will now permit yellow-green 
clothing and other generally acceptable colors.
    As noted above, FRA is adding a definition of''partial 
activation''to address those situations in which the warning provided a 
motorist by a malfunctioning system is of a level that supplemental 
actions are necessary to provide an adequate level of safety. ``Partial 
activation'' means activation of a highway-rail grade crossing warning 
system indicating the approach of a train, however, the full intended 
warning is not provided due to one of the following conditions:
    (1) At non-gated crossings equipped with one pair of lights 
designed to flash alternately, one of the two lights does not operate 
properly (and approaching motorists can not clearly see flashing back 
lights from the warning lights on the other side of the crossing);
    (2) At gated crossings, the gate arm is not in a horizontal 
position; or
    (3) At gated crossings, any portion of a gate arm is missing if 
that portion had held a gate arm flashing light.

Sec. 234.6 (``Penalties'')

    This section is being clarified in two ways. First, a typographical 
error is corrected in the phrase ``imminent hazard of death of 
injury.'' That phrase should read ``imminent hazard of death or 
injury.'' Additionally, this section is being amended to ensure that 
the original intent of FRA is understood by the regulated community as 
well as by FRA and State inspectors enforcing this rule. Railroads can 
not be held responsible for conditions of non-compliance with the rule 
which are beyond their control. Actions of third parties can cause 
grade crossing warning systems to be in noncompliance. For instance, 
large motor vehicles may brush flashing lights, resulting in 
misalignment. Motorists often break off gates. Vandals sometimes break 
flashing light units. Railroads should not be liable under this rule 
for those conditions over which they have no control and which the 
railroad could not have prevented through the exercise of due 
diligence. The concept of due diligence includes the obligation to take 
appropriate action when a railroad discovers an instance of non-
compliance or when it receives sufficiently reliable information 
suggesting non-compliance that warrants investigation. Accordingly, 
this section is being clarified to include the following: ``The 
railroad is not responsible for compliance with respect to any 
condition inconsistent with the technical standards set forth in this 
part where such variance arises as a result of actions beyond the 
control of the railroad and the railroad could not have prevented the 
variance through the exercise of due diligence. The foregoing sentence 
does not excuse any instance of noncompliance resulting from the 
actions of the railroad's employees, agents, or contractors.'' This 
clarification as to the compliance obligations of railroads under Part 
234 is in no way intended to affect whatever common law liability the 
railroad may otherwise be subject to.

[[Page 31804]]

Sec. 234.9 (``Grade crossing system failure reports'')

    Paragraph ``a''. There appears to be some confusion as to where 
activation reports required by this paragraph are to be sent. This 
paragraph states that reports should be completed in accordance with 
instructions printed on the form. At the present time, the form 
requires that the report should be sent to the FRA's headquarters. FRA 
is in the process of amending the instructions to instruct railroads to 
send the forms to the FRA regional office in which the railroad 
headquarters is located. While we prefer that reports be sent to the 
regional offices, until the form is changed, a railroad may continue to 
send reports to Washington.
    Paragraph ``b''. This section relating to false activation reports, 
expired on April 1, 1994. This paragraph is therefore being deleted.

Sec. 234.11 (``Railroad rules'')

    This section, originally part of the 1991 reporting rule, was 
necessary to provide FRA with background information to assist FRA in 
formulating maintenance, inspection, and testing requirements. Inasmuch 
as the rules have been instituted, there is no further need for the 
information required by this section. This section was inadvertently 
retained in the final rule and is therefore now being deleted.

Sec. 234.13 (``Grade crossing signal systems information'')

    This section required that certain grade crossing information be 
filed with FRA by April 1, 1992. This section was inadvertently 
retained in the final rule and is therefore now being deleted.

Sec. 234.103 (``Timely response to reported malfunctions'').

    Paragraph ``b'' of this section requires that until repair or 
correction of the warning system is completed, the railroad shall 
provide alternative means of warning highway traffic and railroad 
employees in accordance with Secs. 234.105 (``activation failure'') and 
234.107 (``false activation''). This paragraph is being revised to 
include reference to new Sec. 234.106 (``partial activation'').

Sec. 234.106 (``Partial activation'')

    This new section clarifies the responsibilities of a railroad in 
the situation in which a grade crossing warning device provides some 
warning of an approaching train, but at a level less than that designed 
for the system. This section requires that upon receipt of a credible 
report of a partial activation, a railroad having maintenance 
responsibility for the warning system shall promptly initiate efforts 
to warn highway users and railroad employees at the subject crossing in 
the same manner as required for false activation in Sec. 234.107.

Sec. 234.207 (``Adjustment, repair, or replacement of component'')

    Paragraph ``b'' of this section is being amended to include 
Sec. 234.106 (partial activation) among those sections based upon which 
a railroad must take certain action until repair of an essential 
component is completed. Thus, until repair of an essential component is 
completed, a railroad shall take appropriate action under Sec. 234.105 
(``activation failure''), Sec. 234.106 (``partial activation''), or 
Sec. 234.107 (``false activation'').

Sec. 234.215 (``Standby power'')

    Under the provisions of the final rule, this section requires the 
railroad to provide a backup power source so that the warning system 
will continue to function normally until the primary source of power is 
restored. This section was the subject of the Petition for 
Reconsideration submitted by the Brotherhood of Railroad Signalmen, the 
American Short Line Railroad Association, and the Association of 
American Railroads in which they jointly requested reconsideration of 
certain aspects of the final rule. The petition for reconsideration 
requested that FRA stay enforcement of this section's requirement that 
a standby source of power ``be provided with sufficient capacity to 
operate the warning system during any period of primary power 
interruption.'' As noted above, FRA granted the petition for 
reconsideration.
    In its Interim Policy Manual issued on April 14, 1995, FRA 
indicated that ``this section requires the railroad to provide a backup 
power source so that the warning system will continue to function 
normally until the primary source of power is restored.'' This section 
is being revised to more clearly reflect the proper interpretation of 
the rule language. FRA is therefore amending this provision to provide 
that a railroad is required to install and properly maintain a standby 
power source in order to operate the system for a reasonable length of 
time during a primary power interruption. Determining the capacity of 
the standby power source will be at the discretion of each individual 
railroad. The designated capacity must be specified on the system plans 
required to be kept at each grade crossing warning system location. 
Factors which should be considered by the railroad are the power 
demands of particular location, the likelihood of discovery of the 
primary power outage (i.e., the presence of electronic notification 
devices, power off indicators, likelihood of employee discovery), the 
availability and proximity of maintenance employees, and the number of 
trains that are operated over the crossing.

Sec. 234.223 (``Gate arm'')

    This section is amended to clarify that the provision requiring 
that each gate arm shall assume the horizontal position at least five 
seconds before the arrival of any train at the crossing applies to 
normal train movements through the crossing. By adding ``normal train 
movement through the crossing'' we are making clear that the five 
second requirement does not apply when trains are performing switching 
operations or making station stops within the grade crossing approach 
circuit. This section was intended to ensure that when a train enters 
the approach circuit to the grade crossing without stopping, the gates 
will be down at least five seconds prior to the arrival of such train. 
While it is possible to design and install the approach circuits to 
activate the system in a predetermined amount of time for a train's 
entrance onto such approach circuit, it is not possible to ensure the 
timing of the warning system gates for train movements such as 
switching movements and passenger train stops made within the approach 
circuit. Train crews must adhere to railroad operating rules before 
entering a grade crossing while performing switching movements or 
departing from stations.

Sec. 234.225 (``Activation of warning system.'')

    This section requires that each highway-rail grade crossing warning 
system be maintained to activate in accordance with the design of the 
warning system, but in no event shall it provide less than 20 seconds 
warning time before the crossing is occupied by rail traffic. This 
section is being amended to clarify that the 20 second warning time 
requirement applies to normal through train operations rather than 
switching movements or train operations that require stopping short of 
the grade crossing. A crossing warning system is not designed for those 
situations in which a switching movement occupies a grade crossing 
approach circuit or trains stop short of a grade crossing. In those 
situations the warning system activates but if a train does not cross 
the grade crossing itself within a set period of time (or in newer

[[Page 31805]]

designs if the motion detector does not detect motion) the system will 
cease providing a warning (``time out''). When the train then occupies 
the crossing after the system has timed out, a full 20 seconds warning 
time may not be provided. In those cases, railroad operating rules 
require that alternative warning be provided the motorist.

Sec. 234.231 (``Fouling wires'')

    This section addressed the situation in which a turnout located 
within a grade crossing train detection circuit is equipped with 
fouling wires. This section is being revised to clarify that 
installation of a single duplex wire with a single plug acting as 
fouling wires is prohibited. The revised section provides that existing 
installations having single duplex wires with a single plug acting as 
fouling wires may be continued in use until they require repair or 
replacement.

Sec. 234.237 (``Switch equipped with circuit controller'')

    The heading for this section was ``Switch equipped with circuit 
controller.'' This heading is being changed to the more accurate and 
descriptive ``Reverse switch cut-out circuit.''

Sec. 234.239 (``Tagging of wires and interference of wires or tags with 
signal apparatus'')

    This section is being revised to clarify that its requirements 
apply to each wire at each terminal in all housings, including switch 
circuit controllers and terminal or junction boxes. This section does 
not apply to flashing light units, gate arm light units and other 
auxiliary light units. Further clarification is provided by stating 
that the local wiring on a solid state crossing controller rack will 
not require tags if the wiring is an integral part of the solid state 
equipment.

Sec. 234.247 (``Purposes of inspections and tests; removal from service 
of relay or device failing to meet test requirements'')

    This section addresses the purposes of inspections and tests and 
the removal from service of devices failing to meet test requirements. 
Subpart D of Part 234 (Maintenance, Inspection, and Testing) is not 
intended to apply to grade crossing warning systems on out of service 
track. To do otherwise would create a pointless regulatory requirement 
in which tests and inspections are performed to ensure the operability 
of a device that will not be operating. Accordingly, this section is 
being clarified to provide that the provisions of Subpart D apply only 
to active railroad tracks. If a railroad elects not to comply with the 
requirements of this subpart because a track is out of service, or the 
railroad suspends operations during a portion of the year, a full 
inspection and tests of all required components must be successfully 
completed before operations resume. FRA is therefore revising the first 
sentence and adding an additional sentence of this section to read: 
``The inspections and tests set forth in Secs. 234.249 through 234.271 
are required at highway-rail grade crossings located on in-service 
railroad tracks and shall be made to determine if the warning system 
and its component parts are maintained in a condition to perform their 
intended function. A railroad may elect not to comply with the 
requirements of these sections if tracks over the grade crossing are 
out of service or the railroad suspends operations during a portion of 
the year, and the grade crossing warning system is also temporarily 
taken out of service. A full inspection and all required tests must be 
successfully completed before railroad operations over the grade 
crossing resume.''

Sec. 234.259 (``Warning time'')

    This section is being amended to provide that, in addition to 
testing the warning system for the prescribed warning time every 12 
months, the system be tested whenever it is modified because of a 
change in train speeds. The preamble to the final rule noted that the 
labor/management group ``state that it would be more appropriate to 
test warning time once each year, or when the warning system is 
modified in connection with changes in authorized train speeds.'' FRA 
accepted this suggestion and extended the period between tests from 
three months to one year but inadvertently omitted the requirement that 
the system be tested whenever modified due to changes in authorized 
train speeds. Although the preamble to the final rule indicated FRA's 
intention to include this in the final rule, such language was not in 
fact included. This section is being revised to correct that oversight.

Sec. 234.263 (``Relays'')

    This section is being revised to add a new subsection ``c'' to 
provide a phase-in period for the industry to test relays, which, as of 
the effective date of the rule, had not been tested within the period 
required by this section. As it has in done in appropriate 
circumstances in the past, FRA is providing a ``phase-in'' period to 
allow railroads to come into compliance with certain provisions of the 
new rule. In situations such as this, when tests are required every 
one, two, or four years, or in the case of insulation resistance tests 
(Sec. 234.267), every ten years, FRA establishes a schedule by which a 
railroad must be in full compliance with a new testing requirement. To 
do otherwise would result in numerous violations immediately upon the 
effective date of a new rule. Such a result would be unfair and would 
not necessarily lead to improved safety. FRA is thus adding new 
subsection ``c'' to provide that not less than 50% of relays requiring 
testing on four year intervals shall be completed by the end of 
calendar year 1996, not less than a total of 75% by the end of calendar 
year 1997; and 100% by the end of calendar year 1998. New subsection 
``d'' provides that testing of relays requiring testing on two year 
intervals shall be completed by the end of calendar year 1996.

Sec. 234.265 (``Timing relays and timing devices'')

    This section requires that each timing relay and timing device be 
tested at least once every twelve months. It also requires that the 
timing be maintained at not less than 90% nor more than 110% of the 
predetermined time interval. The predetermined time interval must be 
shown on the plans or marked on the timing relay or timing device.
    This section is being revised to clarify that internal timing 
devices associated with motion detectors, motion sensors, and grade 
crossing predictors are not subject to the requirements of this 
section.

Sec. 234.267 (``Insulation resistance tests, wires in trunking and 
cables'')

    The heading for this section was accurate in the preamble of the 
final rule, but was incomplete in the actual body of the rule. 
Accordingly, the heading is being amended to add ``wires in trunking 
and cables'' to ``Insulation resistance tests.''
    As it has done with relay testing (Sec. 234.263), FRA is providing 
a ``phase-in'' period to allow railroads to come into compliance with 
the testing provisions of this new requirement. FRA is thus adding new 
section ``e'' to provide that not less than 50% of the required 
insulation resistance testing shall be completed by the end of calendar 
year 1996, not less than a total of 75% by the end of calendar year 
1997; and 100% by the end of calendar year 1998.

[[Page 31806]]

Sec. 234.273 (``Results of tests'')

    The language of this section is incomplete in that it excludes 
``inspections'' from both the title and the body of the rule, despite 
the clear understanding that Secs. 234.247 through 234.271 includes 
both inspections and tests. The TRC recommended that the language in 
this section be amended to more closely reflect the purpose of the 
rule. Therefore, this section is being amended to include 
``inspections'' together with ``tests.''

E.O. 12866 and DOT Regulatory Policies and Procedures

    These amendments have been evaluated in accordance with existing 
policies and procedures. Because these amendments are primarily 
technically oriented and generally reduce the regulatory burden on 
railroads, FRA has concluded that this revisions do not constitute a 
significant rule under either Executive Order 12866 or DOT's regulatory 
policies and procedures.

Regulatory Flexibility Act

    The Regulatory Flexibility Act of 1980 (5 U.S.C. 601 et seq.) 
requires a review of rules to assess their impact on small entities. 
FRA certifies that this rule will not have a significant impact on a 
substantial number of small entities. There are no substantial economic 
impacts for small units of government, businesses, or other 
organizations.

Paperwork Reduction Act

    These amendments to Part 234 do not change any information 
collection requirements.

Environmental Impact

    FRA has evaluated these regulations in accordance with its 
procedure for ensuring full consideration of the potential 
environmental impacts of FRA actions, as required by the National 
Environmental Policy Act and related directives.

  Federalism Implications

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive Order 12612, ``Federalism,'' and it has 
been determined that these amendments to Part 234 do not have 
federalism implications to warrant the preparation of a Federalism 
Assessment.
    Since a number of technical and clarifying changes are being made 
to this part, the entire part is being republished as amended. In that 
way interested parties do not need to wait for the next publication of 
the yearly codification of the Code of Federal Regulations for a 
complete current version of the rule.

List of Subjects in 49 CFR Part 234

    Railroad safety, Highway-rail grade crossings.

The Rule

    In consideration of the foregoing, 49 CFR part 234 is revised as 
follows:

PART 234--GRADE CROSSING SIGNAL SYSTEM SAFETY [AMENDED]

Subpart A--General

Sec.
234.1  Scope.
234.3  Application.
234.4  Preemptive effect.
234.5  Definitions.
234.6  Penalties.

Subpart B--Reports

234.7  Accidents involving grade crossing signal failure.
234.9  Grade crossing signal failure reports.

Subpart C-- Response to Reports of Warning System Malfunction

234.101  Employee notification rules.
234.103  Timely response to report of malfunction.
234.105  Activation failure.
234.107  False activation.
234.109  Recordkeeping

Subpart D--Maintenance, Inspection, and Testing

Maintenance Standards

234.201  Location of plans.
234.203  Control circuits.
234.205  Operating characteristics of warning system apparatus.
234.207  Adjustment, repair, or replacement of component.
234.209  Interference with normal functioning of system.
234.211  Locking of warning system apparatus.
234.213  Grounds.
234.215  Standby power system.
234.217  Flashing light units.
234.219  Gate arm lights and light cable.
234.221  Lamp voltage.
234.223  Gate arm.
234.225  Activation of warning system.
234.227  Train detection apparatus.
234.229  Shunting sensitivity.
234.231  Fouling wires.
234.233  Rail joints.
234.235  Insulated rail joints.
234.237  Reverse switch cut-out circuit.
234.239  Tagging of wires and interference of wires or tags with 
signal apparatus.
234.241  Protection of insulated wire; splice in underground wire.
234.243  Wire on pole line and aerial cable.
234.245  Signs.

Inspections and Tests

234.247  Purpose of inspections and tests; removal from service of 
relay or device failing to meet test requirements.
234.249  Ground tests.
234.251  Standby power.
234.253  Flashing light units and lamp voltage.
234.255  Gate arm and gate mechanism.
234.257  Warning system operation.
234.259  Warning time.
234.261  Highway traffic signal pre-emption.
234.263  Relays.
234.265  Timing relays and timing devices.
234.267  Insulation resistance tests, wires in trunking and cables.
234.269  Cut-out circuits.
234.271  Insulated rail joints, bond wires, and track connections.
234.273  Results of tests.
Appendix A--Schedule of Civil Penalties.
Appendix B--Alternate Methods of Protection under 49 CFR 234.105(c), 
234.106, and 234.107(c).

    Authority: 49 U.S.C.20103, 20107, 20108, 20111, 20112, 20114, 
21301, 21302, 21304, and 21311 (formerly Secs. 202, 208, and 209 of 
the Federal Railroad Safety Act of 1970, as amended (45 U.S.C. 431, 
437, and 438, as amended)); 49 U.S.C.20901 and 20102 (formerly the 
Accident Reports Act); 45 U.S.C. 38 and 42; and 49 CFR 1.49(f), (g), 
and (m).

Subpart A--General

Sec. 234.1  Scope.

    This part imposes minimum maintenance, inspection, and testing 
standards for highway-rail grade crossing warning systems. This part 
also prescribes standards for the reporting of failures of such systems 
and prescribes minimum actions railroads must take when such warning 
systems malfunction. This part does not restrict a railroad from 
adopting and enforcing additional or more stringent requirements not 
inconsistent with this part.

Sec. 234.3  Application.

    This part applies to all railroads except:
    (a) A railroad that exclusively operates freight trains only on 
track which is not part of the general railroad system of 
transportation;
    (b) Rapid transit operations within an urban area that are not 
connected to the general railroad system of transportation; and
    (c) A railroad that operates passenger trains only on track inside 
an installation that is insular; i.e., its operations are limited to a 
separate enclave in such a way that there is no reasonable expectation 
that the safety of the public--except a business guest, a licensee of 
the railroad or an affiliated entity, or a trespasser--would be 
affected by the operation. An operation will not be considered insular 
if one or more of the following exists on its line:
    (1) A public highway-rail crossing that is in use;
    (2) An at-grade rail crossing that is in use;

[[Page 31807]]

    (3) A bridge over a public road or waters used for commercial 
navigation; or
    (4) A common corridor with a railroad, i.e., its operations are 
within 30 feet of those of any railroad.

Sec. 234.4  Preemptive effect.

    Under 49 U.S.C. 20106 (formerly Sec. 205 of the Federal Railroad 
Safety Act of 1970 (45 U.S.C. 434)), issuance of these regulations 
preempts any State law, rule, regulation, order, or standard covering 
the same subject matter, except a provision directed at an essentially 
local safety hazard that is consistent with this part and that does not 
impose an undue burden on interstate commerce.

Sec. 234.5  Definitions.

    As used in this part:
    ``Activation failure'' means the failure of an active highway-rail 
grade crossing warning system to indicate the approach of a train at 
least 20 seconds prior to the train's arrival at the crossing, or to 
indicate the presence of a train occupying the crossing, unless the 
crossing is provided with an alternative means of active warning to 
highway users of approaching trains. (This failure indicates to the 
motorist that it is safe to proceed across the railroad tracks when, in 
fact, it is not safe to do so.) A grade crossing signal system does not 
indicate the approach of a train within the meaning of this paragraph 
if--more than 50% of the flashing lights (not gate arm lights) on any 
approach lane to the crossing are not functioning as intended, or in 
the case of an approach lane for which two or more pairs of flashing 
lights are provided, there is not at least one flashing light pair 
operating as intended. Back lights on the far side of the crossing are 
not considered in making these determinations.
    ``Appropriately equipped flagger'' means a person other than a 
train crewmember who is equipped with a vest, shirt, or jacket of a 
color appropriate for daytime flagging such as orange, yellow, strong 
yellow green or fluorescent versions of these colors or other generally 
accepted high visibility colors. For nighttime flagging, similar 
outside garments shall be retro reflective. Acceptable hand signal 
devices for daytime flagging include `` STOP/SLOW'' paddles or red 
flags. For nighttime flagging, a flashlight, lantern, or other lighted 
signal shall be used. Inasmuch as Part VI of the Federal Highway 
Administration's Manual on Uniform Traffic Control Devices addresses 
standards and guides for flaggers and flagging equipment for highway 
traffic control, FRA recommends that railroads be aware of the 
standards and follow them to the greatest extent possible. Copies of 
the latest MUTCD provisions regarding flagging will be available from 
FRA, as well as FHWA, as changes are made in this area.
    ``Credible report of system malfunction'' means specific 
information regarding a malfunction at an identified highway-rail 
crossing, supplied by a railroad employee, law enforcement officer, 
highway traffic official, or other employee of a public agency acting 
in an official capacity.
    ``False activation'' means the activation of a highway-rail grade 
crossing warning system caused by a condition that requires correction 
or repair of the grade crossing warning system. (This failure indicates 
to the motorist that it is not safe to cross the railroad tracks when, 
in fact, it is safe to do so.)
    ``Highway-rail grade crossing'' means a location where a public 
highway, road, street, or private roadway, including associated 
sidewalks and pathways, crosses one or more railroad tracks at grade.
    ``Partial activation'' means activation of a highway-rail grade 
crossing warning system indicating the approach of a train, however, 
the full intended warning is not provided due to one of the following 
conditions:
    (1) at non-gated crossings equipped with one pair of lights 
designed to flash alternately, one of the two lights does not operate 
properly (and approaching motorists can not clearly see flashing back 
lights from the warning lights on the other side of the crossing);
    (2) at gated crossings, the gate arm is not in a horizontal 
position; or
    (3) at gated crossings, any portion of a gate arm is missing if 
that portion normally had a gate arm flashing light attached.
    ``Train'' means one or more locomotives, with or without cars.
    ``Warning system malfunction'' means an activation failure, a 
partial activation, or a false activation of a highway-rail grade 
crossing warning system.

Sec. 234.6  Penalties.

    (a) Civil penalty. Any person (including but not limited to a 
railroad; any manager, supervisor, official, or other employee or agent 
of a railroad; any owner, manufacturer, lessor, or lessee of railroad 
equipment, track, or facilities; any employee of such owner, 
manufacturer, lessor, lessee, or independent contractor) who violates 
any requirement of this part or causes the violation of any such 
requirement is subject to a civil penalty of at least $500, but not 
more than $10,000 per violation, except that: penalties may be assessed 
against individuals only for willful violations, and where a grossly 
negligent violation or a pattern of repeated violations has created an 
imminent hazard of death or injury to persons, or has caused death or 
injury, a penalty not to exceed $20,000 per violation may be assessed. 
Each day a violation continues shall constitute a separate offense. 
Appendix A to this part contains a schedule of civil penalty amounts 
used in connection with this rule. The railroad is not responsible for 
compliance with respect to any condition inconsistent with the 
technical standards set forth in this part where such variance arises 
as a result of actions beyond the control of the railroad and the 
railroad could not have prevented the variance through the exercise of 
due diligence. The foregoing sentence does not excuse any instance of 
noncompliance resulting from the actions of the railroad's employees, 
agents, or contractors.
    (b) Criminal penalty. Whoever knowingly and willfully makes, causes 
to be made, or participates in the making of a false entry in reports 
required to be filed by this part, or files a false report or other 
document required to be filed by this part is subject to a $5,000 fine 
and 2 years imprisonment as prescribed by 49 U.S.C. 522(a) and section 
209(e) of the Federal Railroad Safety Act of 1970, as amended (45 
U.S.C. 438(e)).

Subpart B--Reports

Sec. 234.7  Accidents involving grade crossing signal failure.

    (a) Each railroad shall report to FRA every impact between on-track 
railroad equipment and an automobile, bus, truck, motorcycle, bicycle, 
farm vehicle, or pedestrian at a highway-rail grade crossing involving 
an activation failure. Notification shall be provided to the National 
Response Center within 24 hours of occurrence at (800) 424-0201. 
Complete reports shall thereafter be filed with FRA pursuant to 
Sec. 234.9 of this part (activation failure report) and 49 CFR 225.11 
(accident/ incident report).
    (b) Each telephone report must state the:
    (1) Name of the railroad;
    (2) Name, title, and telephone number of the individual making the 
report;
    (3) Time, date, and location of accident;
    (4) U. S. DOT-AAR Grade Crossing Identification Number;

[[Page 31808]]

    (5) Circumstances of the accident, including operating details of 
the grade crossing warning device;
    (6) Number of persons killed or injured, if any;
    (7) Maximum authorized train speed; and
    (8) Posted highway speed limit, if known.

Sec. 234.9  Grade crossing signal system failure reports.

    Each railroad shall report to FRA within 15 days each activation 
failure of a highway-rail grade crossing warning system. FRA Form No. 
6180-83, ``Highway-Rail Grade Crossing Warning System Failure Report,'' 
shall be used for this purpose and completed in accordance with 
instructions printed on the form.

Subpart C--Response to Reports of Warning System Malfunction

Sec. 234.101  Employee notification rules.

    Each railroad shall issue rules requiring its employees to report 
to persons designated by that railroad, by the quickest means 
available, any warning system malfunction.

Sec. 234.103  Timely response to report of malfunction.

    (a) Upon receipt of a credible report of a warning system 
malfunction, a railroad having maintenance responsibility for the 
warning system shall promptly investigate the report and determine the 
nature of the malfunction. The railroad shall take appropriate action 
as required by Sec. 234.207.
    (b) Until repair or correction of the warning system is completed, 
the railroad shall provide alternative means of warning highway traffic 
and railroad employees in accordance with Secs. 234.105, 234.106 or 
234.107 of this part.
    (c) Nothing in this subpart requires repair of a warning system, 
if, acting in accordance with applicable State law, the railroad 
proceeds to discontinue or dismantle the warning system. However, until 
repair, correction, discontinuance, or dismantling of the warning 
system is completed, the railroad shall comply with this subpart to 
ensure the safety of the traveling public and railroad employees.

Sec. 234.105  Activation failure.

    Upon receipt of a credible report of warning system malfunction 
involving an activation failure, a railroad having maintenance 
responsibility for the warning system shall promptly initiate efforts 
to warn highway users and railroad employees at the subject crossing by 
taking the following actions:
    (a) Prior to any train's arrival at the crossing, notify the train 
crew of the report of activation failure and notify any other railroads 
operating over the crossing;
    (b) Notify the law enforcement agency having jurisdiction over the 
crossing, or railroad police capable of responding and controlling 
vehicular traffic; and
    (c) Provide for alternative means of actively warning highway users 
of approaching trains, consistent with the following requirements (see 
Appendix B for a summary chart of alternative means of warning):
    (1)(i) If an appropriately equipped flagger provides warning for 
each direction of highway traffic, trains may proceed through the 
crossing at normal speed.
    (ii) If at least one uniformed law enforcement officer (including a 
railroad police officer) provides warning to highway traffic at the 
crossing, trains may proceed through the crossing at normal speed.
    (2) If an appropriately equipped flagger provides warning for 
highway traffic, but there is not at least one flagger providing 
warning for each direction of highway traffic, trains may proceed with 
caution through the crossing at a speed not exceeding 15 miles per 
hour. Normal speed may be resumed after the locomotive has passed 
through the crossing.
    (3) If there is not an appropriately equipped flagger or uniformed 
law enforcement officer providing warning to highway traffic at the 
crossing, each train must stop before entering the crossing and permit 
a crewmember to dismount to flag highway traffic to a stop. The 
locomotive may then proceed through the crossing, and the flagging 
crewmember may reboard the locomotive before the remainder of the train 
proceeds through the crossing.
    (d) A locomotive's audible warning device shall be activated in 
accordance with railroad rules regarding the approach to a grade 
crossing.

Sec. 234.106  Partial activation.

    Upon receipt of a credible report of a partial activation, a 
railroad having maintenance responsibility for the warning system shall 
promptly initiate efforts to warn highway users and railroad employees 
at the subject crossing in the same manner as required for false 
activations (Sec. 234.107).

Sec. 234.107  False activation.

    Upon receipt of a credible report of a false activation, a railroad 
having maintenance responsibility for the highway-rail grade crossing 
warning system shall promptly initiate efforts to warn highway users 
and railroad employees at the crossing by taking the following actions:
    (a) Prior to a train's arrival at the crossing, notify the train 
crew of the report of false activation and notify any other railroads 
operating over the crossing;
    (b) Notify the law enforcement agency having jurisdiction over the 
crossing, or railroad police capable of responding and controlling 
vehicular traffic; and
    (c) Provide for alternative means of actively warning highway users 
of approaching trains, consistent with the following requirements (see 
Appendix B for a summary chart of alternative means of warning).
    (1)(i) If an appropriately equipped flagger is providing warning 
for each direction of highway traffic, trains may proceed through the 
crossing at normal speed.
    (ii) If at least one uniformed law enforcement officer (including a 
railroad police officer) provides warning to highway traffic at the 
crossing, trains may proceed through the crossing at normal speed.
    (2) If there is not an appropriately equipped flagger providing 
warning for each direction of highway traffic, or if there is not at 
least one uniformed law enforcement officer providing warning, trains 
with the locomotive or cab car leading, may proceed with caution 
through the crossing at a speed not exceeding 15 miles per hour. Normal 
speed may be resumed after the locomotive has passed through the 
crossing. In the case of a shoving move, a crewmember shall be on the 
ground to flag the train through the crossing.
    (3) In lieu of complying with paragraphs (c) (1) or (2) of this 
section, a railroad may temporarily take the warning system out of 
service if the railroad complies with all requirements of Sec. 234.105, 
``Activation failure.''
    (d) A locomotive's audible warning device shall be activated in 
accordance with railroad rules regarding the approach to a grade 
crossing.

Sec. 234.109  Recordkeeping.

    (a) Each railroad shall keep records pertaining to compliance with 
this subpart. Records may be kept on forms provided by the railroad or 
by electronic means. Each railroad shall keep the following information 
for each credible report of warning system malfunction:
    (1) Location of crossing (by highway name and DOT/AAR Crossing 
Inventory Number);
    (2) Time and date of receipt by railroad of report of malfunction;

[[Page 31809]]

    (3) Actions taken by railroad prior to repair and reactivation of 
repaired system; and
    (4) Time and date of repair.
    (b) Each railroad shall retain for at least one year (from the 
latest date of railroad activity in response to a credible report of 
malfunction) all records referred to in paragraph (a) of this section. 
Records required to be kept shall be made available to FRA as provided 
by 49 U.S.C. 20107 (formerly 208 of the Federal Railroad Safety Act of 
1970 (45 U.S.C. 437)).

Subpart D--Maintenance, Inspection, and Testing

Maintenance Standards

Sec. 234.201  Location of plans.

    Plans required for proper maintenance and testing shall be kept at 
each highway-rail grade crossing warning system location. Plans shall 
be legible and correct.

Sec. 234.203  Control circuits.

    All control circuits that affect the safe operation of a highway-
rail grade crossing warning system shall operate on the fail-safe 
principle.

Sec. 234.205  Operating characteristics of warning system apparatus.

    Operating characteristics of electromagnetic, electronic, or 
electrical apparatus of each highway-rail crossing warning system shall 
be maintained in accordance with the limits within which the system is 
designed to operate.

Sec. 234.207  Adjustment, repair, or replacement of component.

    (a) When any essential component of a highway-rail grade crossing 
warning system fails to perform its intended function, the cause shall 
be determined and the faulty component adjusted, repaired, or replaced 
without undue delay.
    (b) Until repair of an essential component is completed, a railroad 
shall take appropriate action under Sec. 234.105, Activation failure, 
Sec. 234.106, Partial activation, or Sec. 234.107, False activation, of 
this part.

Sec. 234.209  Interference with normal functioning of system.

    (a) The normal functioning of any system shall not be interfered 
with in testing or otherwise without first taking measures to provide 
for safety of highway traffic that depends on normal functioning of 
such system.
    (b) Interference includes, but is not limited to:
    (1) Trains, locomotives or other railroad equipment standing within 
the system's approach circuit, other than normal train movements or 
switching operations, where the warning system is not designed to 
accommodate those activities.
    (2) Not providing alternative methods of maintaining safety for the 
highway user while testing or performing work on the warning systems or 
on track and other railroad systems or structures which may affect the 
integrity of the warning system.

Sec. 234.211  Security of warning system apparatus.

    Highway-rail grade crossing warning system apparatus shall be 
secured against unauthorized entry.

Sec. 234.213  Grounds.

    Each circuit that affects the proper functioning of a highway-rail 
grade crossing warning system shall be kept free of any ground or 
combination of grounds that will permit a current flow of 75 percent or 
more of the release value of any relay or electromagnetic device in the 
circuit. This requirement does not apply to: circuits that include 
track rail; alternating current power distribution circuits that are 
grounded in the interest of safety; and common return wires of grounded 
common return single break circuits.

Sec. 234.215  Standby power system.

    A standby source of power shall be provided with sufficient 
capacity to operate the warning system for a reasonable length of time 
during a period of primary power interruption. The designated capacity 
shall be specified on the aplans required by Sec. 234.201 of this part.

Sec. 234.217  Flashing light units.

    (a) Each flashing light unit shall be properly positioned and 
aligned and shall be visible to a highway user approaching the 
crossing.
    (b) Each flashing light unit shall be maintained to prevent dust 
and moisture from entering the interior of the unit. Roundels and 
reflectors shall be clean and in good condition.
    (c) All light units shall flash alternately. The number of flashes 
per minute for each light unit shall be 35 minimum and 65 maximum.

Sec. 234.219  Gate arm lights and light cable.

    Each gate arm light shall be maintained in such condition to be 
properly visible to approaching highway users. Lights and light wire 
shall be secured to the gate arm.

Sec. 234.221  Lamp voltage.

    The voltage at each lamp shall be maintained at not less than 85 
percent of the prescribed rating for the lamp.

Sec. 234.223  Gate arm.

    Each gate arm, when in the downward position, shall extend across 
each lane of approaching highway traffic and shall be maintained in a 
condition sufficient to be clearly viewed by approaching highway users. 
Each gate arm shall start its downward motion not less than three 
seconds after flashing lights begin to operate and shall assume the 
horizontal position at least five seconds before the arrival of any 
normal train movement through the crossing. At those crossings equipped 
with four quadrant gates, the timing requirements of this section apply 
to entrance gates only.

Sec. 234.225  Activation of warning system.

    A highway-rail grade crossing warning system shall be maintained to 
activate in accordance with the design of the warning system, but in no 
event shall it provide less than 20 seconds warning time for the normal 
operation of through trains before the grade crossing is occupied by 
rail traffic.

Sec. 234.227  Train detection apparatus.

    (a) Train detection apparatus shall be maintained to detect a train 
or railcar in any part of a train detection circuit, in accordance with 
the design of the warning system.
    (b) If the presence of sand, rust, dirt, grease, or other foreign 
matter is known to prevent effective shunting, a railroad shall take 
appropriate action under Sec. 234.105, ``Activation failure,'' to 
safeguard highway users.

Sec. 234.229  Shunting sensitivity.

    Each highway-rail grade crossing train detection circuit shall 
detect the application of a shunt of 0.06 ohm resistance when the shunt 
is connected across the track rails of any part of the circuit.

Sec. 234.231  Fouling wires.

    Each set of fouling wires in a highway-rail grade crossing train 
detection circuit shall consist of at least two discrete conductors. 
Each conductor shall be of sufficient conductivity and shall be 
maintained in such condition to ensure proper operation of the train 
detection apparatus when the train detection circuit is shunted. 
Installation of a single duplex wire with single plug acting as fouling 
wires is prohibited. Existing installations having single duplex wires 
with a single plug for fouling wires may be continued in use until they 
require repair or replacement.

Sec. 234.233  Rail joints.

    Each non-insulated rail joint located within the limits of a 
highway-rail grade crossing train detection circuit shall be

[[Page 31810]]

bonded by means other than joint bars and the bonds shall be maintained 
in such condition to ensure electrical conductivity.

Sec. 234.235  Insulated rail joints.

    Each insulated rail joint used to separate train detection circuits 
of a highway-rail grade crossing shall be maintained to prevent current 
from flowing between rails separated by the insulation in an amount 
sufficient to cause a failure of the train detection circuit.

Sec. 234.237  Reverse switch cut-out circuit.

    A switch, when equipped with a switch circuit controller connected 
to the point and interconnected with warning system circuitry, shall be 
maintained so that the warning system can only be cut out when the 
switch point is within one-half inch of full reverse position.

Sec. 234.239  Tagging of wires and interference of wires or tags with 
signal apparatus.

    Each wire shall be tagged or otherwise so marked that it can be 
identified at each terminal. Tags and other marks of identification 
shall be made of insulating material and so arranged that tags and 
wires do not interfere with moving parts of the apparatus. This 
requirement applies to each wire at each terminal in all housings 
including switch circuit controllers and terminal or junction boxes. 
This requirement does not apply to flashing light units, gate arm light 
units and other auxiliary light units. The local wiring on a solid 
state crossing controller rack does not require tags if the wiring is 
an integral part of the solid state equipment.

Sec. 234.241  Protection of insulated wire; splice in underground wire.

    Insulated wire shall be protected from mechanical injury. The 
insulation shall not be punctured for test purposes. A splice in 
underground wire shall have insulation resistance at least equal to 
that of the wire spliced.

Sec. 234.243  Wire on pole line and aerial cable.

    Wire on a pole line shall be securely attached to an insulator that 
is properly fastened to a cross arm or bracket supported by a pole or 
other support. Wire shall not interfere with, or be interfered with by, 
other wires on the pole line. Aerial cable shall be supported by 
messenger wire. An open-wire transmission line operating at voltage of 
750 volts or more shall be placed not less than 4 feet above the 
nearest cross arm carrying active warning system circuits.

Sec. 234.245  Signs.

    Each sign mounted on a highway-rail grade crossing signal post 
shall be maintained in good condition and be visible to the highway 
user.

Inspections and Tests

Sec. 234.247  Purpose of inspections and tests; removal from service of 
relay or device failing to meet test requirements.

    (a) The inspections and tests set forth in Secs. 234.249 through 
234.271 are required at highway-rail grade crossings located on in 
service railroad tracks and shall be made to determine if the warning 
system and its component parts are maintained in a condition to perform 
their intended function.
    (b) If a railroad elects not to comply with the requirements of 
these sections because all tracks over the grade crossing are out of 
service or the railroad suspends operations during a portion of the 
year, or the railroad suspends operations during a portion of the year, 
and the grade crossing warning system is also temporarily taken out of 
service a full inspection and all required tests must be successfully 
completed before railroad operations over the grade crossing resume.
    (c) Any electronic device, relay, or other electromagnetic device 
that fails to meet the requirements of tests required by this part 
shall be removed from service and shall not be restored to service 
until its operating characteristics are in accordance with the limits 
within which such device or relay is designed to operate.

Sec. 234.249  Ground tests.

    A test for grounds on each energy bus furnishing power to circuits 
that affect the safety of warning system operation shall be made when 
such energy bus is placed in service and at least once each month 
thereafter.

Sec. 234.251  Standby power.

    Standby power shall be tested at least once each month.

Sec. 234.253  Flashing light units and lamp voltage.

    (a) Each flashing light unit shall be inspected when installed and 
at least once every twelve months for proper alignment and frequency of 
flashes in accordance with installation specifications.
    (b) Lamp voltage shall be tested when installed and at least once 
every 12 months thereafter.
    (c) Each flashing light unit shall be inspected for proper 
visibility, dirt and damage to roundels and reflectors at least once 
each month.

Sec. 234.255  Gate arm and gate mechanism.

    (a) Each gate arm and gate mechanism shall be inspected at least 
once each month.
    (b) Gate arm movement shall be observed for proper operation at 
least once each month.
    (c) Hold-clear devices shall be tested for proper operation at 
least once every 12 months.

Sec. 234.257  Warning system operation.

    (a) Each highway-rail crossing warning system shall be tested to 
determine that it functions as intended when it is placed in service. 
Thereafter, it shall be tested at least once each month and whenever 
modified or disarranged.
    (b) Warning bells or other stationary audible warning devices shall 
be tested when installed to determine that they function as intended. 
Thereafter, they shall be tested at least once each month and whenever 
modified or disarranged.

Sec. 234.259  Warning time.

    Each crossing warning system shall be tested for the prescribed 
warning time at least once every 12 months and when the warning system 
is modified because of a change in train speeds. Electronic devices 
that accurately determine actual warning time may be used in performing 
such tests.

Sec. 234.261  Highway traffic signal pre-emption.

    Highway traffic signal pre-emption interconnections, for which a 
railroad has maintenance responsibility, shall be tested at least once 
each month.

Sec. 234.263  Relays.

    (a) Except as stated in paragraph (b) of this section, each relay 
that affects the proper functioning of a crossing warning system shall 
be tested at least once every four years.
    (b)(1) Alternating current vane type relays, direct current polar 
type relays, and relays with soft iron magnetic structure shall be 
tested at least once every two years.
    (2) Alternating current centrifugal type relays shall be tested at 
least once every 12 months.
    (c) Testing of relays requiring testing on four year intervals 
shall be completed in accordance with the following schedule:
    (1) Not less than 50% by the end of calendar year 1996;
    (2) Not less than a total of 75% by the end of calendar year 1997; 
and
    (3) One hundred percent by the end of calendar year 1998.
    (d) Testing of relays requiring testing on two year intervals shall 
be completed by the end of calendar year 1996.

[[Page 31811]]

Sec. 234.265  Timing relays and timing devices.

    Each timing relay and timing device shall be tested at least once 
every twelve months. The timing shall be maintained at not less than 90 
percent nor more than 110 percent of the 41 predetermined time 
interval. The predetermined time interval shall be shown on the plans 
or marked on the timing relay or timing device. Timing devices which 
perform internal functions associated with motion detectors, motion 
sensors, and grade crossing predictors are not subject to the 
requirements of this section.

Sec. 234.267  Insulation resistance tests, wires in trunking and 
cables.

    (a) Insulation resistance tests shall be made when wires or cables 
are installed and at least once every ten years thereafter.
    (b) Insulation resistance tests shall be made between all 
conductors and ground, between conductors in each multiple conductor 
cable, and between conductors in trunking. Insulation resistance tests 
shall be performed when wires, cables, and insulation are dry.
    (c) Subject to paragraph (d) of this section, when insulation 
resistance of wire or cable is found to be less than 500,000 ohms, 
prompt action shall be taken to repair or replace the defective wire or 
cable. Until such defective wire or cable is replaced, insulation 
resistance tests shall be made annually.
    (d) A circuit with a conductor having an insulation resistance of 
less than 200,000 ohms shall not be used.
    (e) Required insulation resistance testing that does not conform to 
the required testing schedule of this section shall be completed in 
accordance with the following schedule:
    (1) Not less than 50% by the end of calendar year 1996;
    (2) Not less than a total of 75% by the end of calendar year 1997; 
and
    (3) One hundred percent by the end of calendar year 1998.

Sec. 234.269  Cut-out circuits.

    Each cut-out circuit shall be tested at least once every three 
months to determine that the circuit functions as intended. For 
purposes of this section, a cut-out circuit is any circuit which 
overrides the operation of automatic warning systems. This includes 
both switch cut-out circuits and devices which enable personnel to 
manually override the operation of automatic warning systems.

Sec. 234.271  Insulated rail joints, bond wires, and track connections.

    Insulated rail joints, bond wires, and track connections shall be 
inspected at least once every three months.

Sec. 234.273  Results of inspections and tests.

    (a) Results of inspections and tests made in compliance with this 
part shall be recorded on forms provided by the railroad, or by 
electronic means, subject to approval by the Associate Administrator 
for Safety. Each record shall show the name of the railroad, AAR/DOT 
inventory number, place and date, equipment tested, results of tests, 
repairs, replacements, adjustments made, and condition in which the 
apparatus was left.
    (b) Each record shall be signed or electronically coded by the 
employee making the test and shall be filed in the office of a 
supervisory official having jurisdiction. Records required to be kept 
shall be made available to FRA as provided by 49 U.S.C. 20107 (formerly 
Sec. 208 of the Federal Railroad Safety Act of 1970 (45 U.S.C. 437)).
    (c) Each record shall be retained until the next record for that 
test is filed but in no case for less than one year from the date of 
the test.

        Appendix A to Part 234.--Schedule of Civil Penalties \1\        
------------------------------------------------------------------------
                                                               Willful  
                    Section                      Violation    violation 
------------------------------------------------------------------------
              Subpart B--Reports                                        
                                                                        
234.7  Accidents involving grade crossing                               
 signal failure...............................       $5,000       $7,500
234.9  Grade crossing signal system failure                             
 reports......................................        2,500        5,000
                                                                        
   Subpart C--Response to Reports of Warning                            
              System Malfunction                                        
                                                                        
Sec.                                                                    
234.101  Employee notification rules..........        2,500        5,000
234.103  Timely response to report of                                   
 malfunction..................................        2,500        5,000
    234.105  Activation failure                                         
        (a) Failure to notify--train crews....        5,000        7,500
            Other railroads...................        5,000        7,500
        (b) Failure to notify law enforcement                           
         agency...............................        2,500        5,000
        (c) Failure to comply with--flagging                            
         requirements.........................        5,000        5,000
            Speed restrictions................        5,000        7,500
        (d) Failure to activate horn or                                 
         whistle..............................        5,000        7,500
    234.106  Partial activation                                         
        (a) Failure to notify--train crews....        5,000        7,500
            Other railroads...................        5,000        7,500
        (b) Failure to notify law enforcement                           
         agency...............................        2,500        5,000
        (c) Failure to comply with--flagging                            
         requirements speed restrictions......        5,000        7,500
        (d) Failure to activate horn or                                 
         whistle..............................        5,000        7,500
    234.107  False activation                                           
        (a) Failure to notify--train crews....        5,000        7,500
            Other railroads...................        5,000        7,500
        (b) Failure to notify law enforcement                           
         agency...............................        2,500        5,000
        (c) Failure to comply with--flagging                            
         requirements.........................        5,000        7,500
            Speed restrictions................        5,000        7,500
        (d) Failure to activate horn or                                 
         whistle..............................        5,000        7,500
    234.109  Recordkeeping....................        1,000        2,000
                                                                        
    Subpart D--Maintenance, Inspection, and                             
                    Testing                                             
                                                                        
Maintenance Standards:                                                  
    234.201  Location of plans................        1,000        2,000
    234.203  Control circuits.................        1,000        2,000
    234.205  Operating characteristics of                               
     warning system apparatus.................        2,500        5,000

[[Page 31812]]

                                                                        
    234.207  Adjustment, repair, or                                     
     replacement of component.................        2,500        5,000
    234.209  Interference with normal                                   
     functioning of system....................        5,000        7,500
    234.211  Locking of warning system                                  
     apparatus................................        1,000        2,000
    234.213  Grounds..........................        1,000        2,000
    234.215  Standby power system.............        5,000        7,500
    234.217  Flashing light units.............        1,000        2,000
    234.219  Gate arm lights and light cable..        1,000        2,000
    234.221  Lamp voltage.....................        1,000        2,000
    234.223  Gate arm.........................        1,000        2,000
    234.225  Activation of warning system.....        5,000        7,500
    234.227  Train detection apparatus........        2,500        5,000
    234.229  Shunting sensitivity.............        2,500        5,000
    234.231  Fouling wires....................        1,000        2,000
    234.233  Rail joints......................        1,000        2,000
    234.235  Insulated rail joints............        1,000        2,000
    234.237  Switch equipped with circuit                               
     controller...............................        1,000        2,000
    234.239  Tagging of wires and interference                          
     of wires or tags with signal apparatus...        1,000        2,000
    234.241  Protection of insulated wire;                              
     splice in underground wire...............        1,000        2,000
    234.243  Wire on pole line and aerial                               
     cable....................................        1,000        2,000
    234.245  Signs............................        1,000        2,000
Inspections and Tests:                                                  
    234.247  Purpose of inspections and tests;                          
     removal from service of relay or device                            
     failing to meet test requirements........        2,500        5,000
    234.249  Ground tests.....................        2,500        5,000
    234.251  Standby power....................        5,000        7,500
    234.253  Flashing light units and lamp                              
     voltage..................................        1,000        2,000
    234.255  Gate arm and gate mechanism......        1,000        2,000
    234.257  Warning system operation.........        2,500        5,000
    234.259  Warning time.....................        1,000        2,000
    234.261  Highway traffic signal pre-                                
     emption..................................        1,000        2,000
    234.263  Relays...........................        1,000        2,000
    234.265  Timing relays and timing devices.        1,000        2,000
    234.267  Insulation resistance tests,                               
     wires in trunking and cables.............        2,500        5,000
    234.269  Cut-out circuits.................        1,000        2,000
    234.271  Insulated rail joints, bond                                
     wires, and track connections.............        2,500        5,000
    234.273  Results of tests.................        1,000       2,000 
------------------------------------------------------------------------
\1\ A penalty may be assessed against an individual only for a willful  
  violation. The Administrator reserves the right to assess a penalty of
  up to $20,000 for any violation where circumstances warrant. See 49   
  CFR Part 209, Appendix A.                                             

                        Appendix B to Part 234.--Alternate Methods of Protection Under 49 CFR 234.105(c), 234.106, and 234.107(c)                       
                                             [This is a summary--see body of text for complete requirements]                                            
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                     Flagger present, but not                           
                                     Flagger for each direction of      Police officer present      one for each direction of     No flagger/no police  
                                                traffic                                                      traffic                                    
--------------------------------------------------------------------------------------------------------------------------------------------------------
False Activation..................  Normal Speed..................  Normal Speed..................  Proceed with caution--     Proceed with caution--   
                                                                                                     maximum speed of 15 mph.   maximum speed of 15 mph.
Partial Activation*...............  Normal Speed..................  Normal Speed..................  Proceed with caution--     Proceed with caution--   
                                                                                                     maximum speed of 15 mph.   maximum speed of 15 mph.
Activation Failure**..............  Normal Speed..................  Normal Speed..................  Proceed with caution--     Stop: Crewmember flag    
                                                                                                     maximum speed of 15 mph.   traffic and reboard.    
--------------------------------------------------------------------------------------------------------------------------------------------------------
*Partial activiation--full warning not given.                                                                                                           
  Non-gated crossing with one pair of lights designed to flash alternatively, one light does not work (and back-lights from other side not visible).    
  Gated crossing--gate arm not horizontal; or any portion of a gate arm is missing if that portion had held a gate arm flashing light.                  
**Activitation failure includes--if more than 50% of the flashing lights on any approach lane not functioning; or if an approach lane has two or more   
  pairs of flashing lights, there is not at least one pair operating as intended.                                                                       

    Issued in Washington, D.C. on May 30, 1996.
Donald M. Itzkoff,
Deputy Administrator.
[FR Doc. 96-15299 Filed 6-19-96; 8:45 am]
BILLING CODE 4910-06-M

Complete official Federal Register PDF

FR Doc. 96-15051 Consolidation of Repetitive Provisions; Technical Amendments
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31427-31434]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15051]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Occupational Safety and Health Administration

29 CFR Parts 1910, 1915 and 1926

RIN 1218-AB53

Consolidation of Repetitive Provisions; Technical Amendments

AGENCY: Occupational Safety and Health Administration, Department of 
Labor.

ACTION: Final rule; technical amendments and recodifications.

-----------------------------------------------------------------------

SUMMARY: As part of a line-by-line review of its standards, the 
Occupational Safety and Health Administration (OSHA) is consolidating

[[Page 31428]]

repetitious provisions, removing duplicative pages, making corrections, 
and clarifying and reorganizing various sections of its standards in 
the Code of Federal Regulations (CFR). This action is being taken in 
response to a Presidential initiative begun in March 1995 to streamline 
Federal regulatory efforts. In addition, OSHA is removing certain fire 
protection standards from the Safety and Health Regulations for 
Construction that had inadvertently been identified as applicable to 
construction work. The document being published today does not make any 
changes to the substantive requirements of the standards.

EFFECTIVE DATE: June 30, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Anne Cyr, Office of Information 
and Consumer Affairs, OSHA, U.S. Department of Labor, Room N3647, 200 
Constitution Avenue, N.W., Washington, DC 20210; telephone: (202) 219-
8151.

SUPPLEMENTARY INFORMATION:

I. Background

    In March 1995, the President directed Federal agencies to undertake 
a line-by-line review of their rules and regulations to determine where 
they could be simplified or clarified. OSHA initiated such a review 
and, as a result, completed a document on May 31, 1995, entitled 
``OSHA's Regulatory Reform Initiatives.'' That document delineated 
those rules and regulations that could be deleted or revised to improve 
compliance by employers and, consequently, provide enhanced 
occupational safety and health protection to employees. This regulatory 
improvement process involves revocation of outdated and obsolete 
provisions, consolidation of repetitious provisions, and clarification 
of ambiguous requirements.
    The Agency began the process by issuing a final rule in the Federal 
Register on March 7, 1996 (61 FR 9228), which addressed minor 
clarifications, corrections, and technical amendments to OSHA 
standards. This notice is the second in a series of actions and is 
directed at consolidating repetitious provisions. More specifically, 
instead of repeating identical regulatory text in all three parts of 
the OSHA standards--general industry, shipyard employment, and 
construction standards (parts 1910, 1915, and 1926, respectively), OSHA 
will print the regulatory text that is common to all industries in its 
part 1910 volumes. OSHA has already accomplished this for its 
agricultural standards, which are codified in 29 CFR Part 1928, by 
publishing a Federal Register notice [61 FR 9228; March 7, 1996]. 
Appropriate references will be made in the construction and shipyard 
employment parts of the CFR to direct employers to the appropriate 
section of the part 1910 volumes.
    To assist employers and employees in the construction industry who 
prefer to have a single source that includes all of the standards that 
apply to their work, OSHA will publish a booklet in the near future 
that will contain all of the standards applicable to the construction 
industry.
    The Agency plans to undertake a number of additional regulatory 
reform initiatives. For example, OSHA is developing a proposed rule, 
which will be subject to public notice and comment, to make substantive 
changes in various standards to diminish regulatory burdens without 
reducing worker protections. OSHA also intends to take actions to 
reduce paperwork burdens, rewrite standards in ``plain English,'' and 
simplify its standards.

II. Summary and Explanation of the Changes

    In 1993, OSHA revised its part 1915 (shipyard) and part 1926 
(construction) standards in the Code of Federal Regulations (CFR) by 
adding to part 1915 and part 1926, respectively, those standards 
applicable to shipyards or construction that had formerly only been 
printed in part 1910 of the CFR. The added standards included their own 
part 1915 and part 1926 designations and duplicated all of the 
regulatory text. This nearly doubled the number of CFR pages in part 
1926 and added many CFR pages to part 1915 (see 58 FR 35076; June 30, 
1993, and 58 FR 35512; July 1, 1993). The majority of the standards 
that were duplicated were standards relating to occupational health 
hazards. Most of the general industry standards incorporated through 
this action had long been applied to construction and shipyard 
employments, with only a few exceptions.
    OSHA has found that printing the identical rules in three separate 
parts of its rules and regulations unnecessarily lengthens the CFR. As 
it eliminates these duplications, OSHA will provide taxpayers with a 
cost savings by reducing the number of pages in its CFR parts.
    Most of the changes being made occur in subpart Z of parts 1910, 
1915 and 1926. For example, many of the occupational health standards 
in subpart Z of the general industry standards (part 1910) apply to 
both shipyard employment (part 1915) and the construction industry 
(part 1926). Rather than printing subpart Z standards that applied to 
more than one industry in one place, OSHA printed the same standards in 
each of the three parts of its CFR. This has caused confusion when, for 
example, a construction employer who has projects in construction and 
general industry has employees who are exposed to a given air 
contaminant that is regulated both in subpart Z of the construction 
standards (part 1926) and in subpart Z of the general industry 
standards (part 1910). In such a case, an employer could mistakenly 
believe that two different permissible exposure limits apply to the 
same contaminant, since subpart Z of the construction standards and 
subpart Z of the general industry standards (part 1910) both have a 
limit for the contaminant. In this document, OSHA is eliminating such 
duplicative standards and replacing them with cross references to 
eliminate any possible confusion and to reduce the volume of the rules.
    OSHA is eliminating duplicate health standards from the shipyard 
(part 1915) and construction (part 1926) parts of the CFR and is 
replacing them with cross references to the identical text in subpart Z 
of part 1910. This action does not in any way change the burden on 
employers or lessen employee protection because the same standards will 
continue to apply to shipyard employment and the construction industry.
    For example, the requirements to protect workers from arsenic 
exposure in shipyards and construction are identical to those applying 
to general industry. Consequently, the regulatory text in 
Sec. 1915.1018, the arsenic standard applying to shipyards, and the 
requirements in Sec. 1926.1118, the arsenic standard applying to 
construction, are identical to the regulatory text in Sec. 1910.1018, 
the arsenic standard in general industry.
    The technical amendments issued today will retain the section 
number and heading for the arsenic standard in the shipyard standards 
(Sec. 1915.1018, Inorganic arsenic) and in the construction standards 
(Sec. 1926.1118, Inorganic arsenic) to remind employers searching for 
them of their new location, but will replace the duplicated regulatory 
text with a simple cross reference stating, ``Note: The requirements 
applicable to construction work under this section are identical to 
those set forth at 29 CFR 1910.1018.''
    Where a health standard in subpart Z of the general industry 
standards (1910) differs from the standard addressing the same hazard 
in shipyard employment or in the construction industry, the entire text 
of that health standard will remain

[[Page 31429]]

in the shipyard and construction standards. In other words, where OSHA 
has developed a health standard for shipyards or construction that 
differs substantially from the general industry standard for the same 
hazard, the industry-specific standard will remain in the part of the 
CFR devoted to that industry. For example, in the case of cadmium, the 
regulatory text differs for general industry and construction; 
therefore, the complete regulatory text is printed both at 
Sec. 1910.1017 and at 1926.1127, i.e., in the general industry and 
construction parts, respectively. However, the shipyard standard for 
cadmium, Sec. 1915.1017, is identical to the general industry cadmium 
standard, Sec. 1910.1017. The duplicative regulatory text is being 
deleted from part 1915 and replaced with an appropriate cross reference 
to Sec. 1910.1017. Similarly, appendices A to F of the standard are 
identical for all three parts. Therefore, the duplicative appendices 
are being deleted from part 1915 (shipyards) and part 1926 
(construction). These actions avoid the need to reprint 185 duplicative 
CFR pages.
    Another change being made involves moving two standards currently 
in subpart C of the general industry standards (part 1910) to subpart Z 
of those standards in an effort to locate virtually all of OSHA's 
health standards in one subpart and in one volume of the CFR. OSHA is 
redesignating Sec. 1910.20 (Access to employee exposure and medical 
records) as Sec. 1910.1020 and Sec. 1910.96 (Ionizing radiation) as 
Sec. 1910.1096. This will place virtually all of OSHA's general 
industry health standards in subpart Z of part 1910.
    Another change applies to OSHA's Commercial Diving Standard, which 
is currently codified both in the general industry and the construction 
standards. OSHA has received requests from industry representatives to 
locate the diving standard in one location, preferably in part 1910 
(general industry). Most diving contractors operate in all three 
industry areas (i.e., general industry, construction, and maritime), 
moving from one industry to another to perform their work. The 
Association of Diving Contractors (ADC) members and others, such as 
Seaward Marine Services, Inc., one of the largest diving companies in 
the Nation, have asked OSHA to maintain the requirements for commercial 
diving in part 1910 only. The diving industry reports that multiple 
diving standards are causing confusion in the issuance of diving 
contract specifications. The Diving Standards in Subpart Y of the 
construction standards are identical to the Diving Standards in Subpart 
T of the general industry standards. Rather than repeating the 
standards in both parts, OSHA is removing the regulatory text in its 
entirety from the construction standards and replacing that text with a 
cross reference to the Diving Standard in Subpart T of the general 
industry standards.
    Also, in the shipyard employment standards, OSHA is redesignating 
Sec. 1915.1120--Access to employee exposure and medical records, as 
Sec. 1915.1020. The purpose of this change is, as much as possible, to 
keep the section number designations--in this case .1020--the same for 
each part if a standard addressing the same topic and having the same 
name is codified both in the general industry and shipyard standards. 
OSHA is unable to follow this numbering scheme in the case of the 
construction standards, however, because vacant section numbers are not 
available in the construction industry CFR volume.
    In addition, in the 1993 recodification process described earlier, 
OSHA identified some provisions from its standards in Subpart L of Part 
1910 Fire Protection and Prevention (Sec. 1910.156 to 1910.165) as 
applicable to the construction industry. However, on further 
examination, this was an incorrect identification because OSHA's 
general industry standards for Subpart L state at Sec. 1910.155 Scope, 
application and definitions applicable to this subpart:
    (b) Application. This subpart applies to all employments except for 
maritime, construction, and agriculture.
    This final rule corrects this misidentification by removing the 
text of Secs. 1926.97, 1926.98; 1926.150(c)(1)(xi) to (c)(1)(xiv); and 
1926.156 through 1926.159, all of which were based on requirements in 
Secs. 1910.156 to 1910.165.
    Finally, as stated in the 1993 recodification, OSHA has made every 
effort to identify those standards published in part 1910, General 
Industry, which are most likely to be applicable to shipyard employment 
and construction work. OSHA notes, however, that other standards 
published in part 1910 may, under some circumstances, also be 
applicable.

III. Regulatory Flexibility Certification

    The Regulatory Flexibility Act of 1980 (5 U.S.C. 601 et seq.), as 
amended, requires that the Agency examine regulatory actions to 
determine if they would have a significant economic impact on a 
substantial number of small entities. The modifications being made in 
this final rule do not increase or reduce the regulatory burden on any 
employer, large or small. For that reason, the Agency hereby certifies 
that these changes will not have a significant economic impact on a 
substantial number of small entities.

IV. Exemption From Notice and Comment Procedures

    OSHA finds that there is good cause not to follow procedures for 
public notice and comment set forth in section 6(b) of the Occupational 
Safety and Health Act (29 U.S.C. 655 (b)) or under section 4 of the 
Administrative Procedure Act (5 U.S.C. 553). Notice is unnecessary 
pursuant to 5 U.S.C. 553 (b)(3)(B) because these actions are technical 
amendments that do not affect the substantive requirements or coverage 
of the standards themselves. This removal of duplicative provisions and 
reorganization of standards within the CFR does not modify or revoke 
existing rights or obligations, nor does it establish new ones.
    For the same reasons, OSHA also finds that, in accordance with 29 
CFR 1911.5, good cause exists for dispensing with the public notice and 
comment procedures prescribed in section 6(b) of the Occupational 
Safety and Health Act.
    OSHA also finds for the same reasons that there is good cause for 
an effective date of less than 30 days after publication pursuant to 5 
U.S.C. 553(d) and because the June 30, 1996, effective date will permit 
these changes to be reflected in the 1996 volumes of 29 CFR.

List of Subjects

29 CFR Part 1910

    Occupational safety and health.

29 CFR Part 1915

    Longshore and harbor workers, Occupational safety and health, 
Vessels.

29 CFR Part 1926

    Construction industry, Occupational safety and health.

    Signed at Washington, DC, this 10th day of June 1996.
Joseph A. Dear,
Assistant Secretary of Labor.
    Accordingly, pursuant to sections 4, 6 and 8 of the Occupational 
Safety and Health Act of 1970 (29 U.S.C. 653, 655 and 657); section 107 
of the Contract Work Hours and Safety Standards Act (Construction 
Safety Act) (40 U.S.C. 333); Sec. 41 of the Longshore and Harbor 
Workers' Compensation Act (33 U.S.C. 941), section 4 of the 
Administrative Procedure Act (5 U.S.C. 553); Secretary of Labor's Order 
1-90 (55 FR 9033); and 29 CFR part 1911, 29 CFR parts 1910, 1915 and 
1926 are amended as set forth below.

[[Page 31430]]

PART 1910--OCCUPATIONAL SAFETY AND HEALTH STANDARDS

Sec. 1910.20  [Redesignated as Sec. 1910.1020]

    1. Section 1910.20 is redesignated as new Sec. 1910.1020.

Subpart C--[Removed and Reserved]

    2. Subpart C is removed and reserved.

Subpart G--Occupational Health and Environmental Control

    3. The authority citation for subpart G of part 1910 continues to 
read as follows:

    Authority: Sections 4, 6, and 8 of the Occupational Safety and 
Health Act of 1970 (29 U.S.C. 653, 655, 657); Secretary of Labor's 
Order No. 12-71 (36 FR 8754), 8-76 (41 FR 25059), 9-83 (48 FR 
35736), or 1-90 (55 FR 9033), as applicable; 29 CFR part 1911.

Sec. 1910.96  [Redesignated as Sec. 1910.1096]

    4. Section 1910.96 is redesignated as new Sec. 1910.1096.

Subpart Z--Toxic and Hazardous Substances

    5. The authority citation for subpart Z of part 1910 is revised to 
read as follows:

    Authority: Sections 4, 6, and 8 of the Occupational Safety and 
Health Act of 1970 (29 U.S.C. 653, 655, and 657); Secretary of 
Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 25059), 9-83 (48 
FR 35736), of 1-90 (55 FR 9033), as applicable; and 29 CFR part 
1911.

    All of subpart Z issued under sec. 6(b) of the Occupational 
Safety and Health Act, except those substances that have exposure 
limits listed in Tables Z-1, Z-2, or Z-3 of 29 CFR 1910.1000. The 
latter were issued under sec. 6(a) (29 U.S.C. 655(a)).
    Section 1910.1000, Tables Z-1, Z-2, and Z-3 also issued under 5 
U.S.C. 553. Section 1910.1000, Tables Z-1, Z-2, and Z-3 not issued 
under 29 CFR part 1911 except for the arsenic (organic compounds), 
benzene, and cotton dust listings.
    Section 1910.1001 also issued under section 107 of the Contract 
Work Hours and Safety Standards Act (40 U.S.C. 333) and 5 U.S.C. 
553.
    Section 1910.1002 not issued under 29 U.S.C. 655 or 29 CFR part 
1911; also issued under 5 U.S.C. 553.
    Section 1910.1200 also issued under 5 U.S.C. 553.

    6. In Sec. 1910.1003, the heading is revised to read ``13 
Carcinogens (4-Nitrobiphenyl, etc.).''

PART 1915--OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD 
EMPLOYMENT

    1. The authority citation of part 1915 is revised to read as 
follows:

    Authority: Sec. 41, Longshore and Harbor Workers' Compensation 
Act (33 U.S.C. 941); secs. 4, 6, 8, Occupational Safety and Health 
Act of 1970 (29 U.S.C. 653, 655, 657); Secretary of Labor's Order 
No. 12-71 (36 FR 8754), 8-76 (41 FR 25059), 9-83 (48 FR 35736) or 1-
90 (55 FR 9033), as applicable; 29 CFR part 1911.

    Section 1915.100 also issued under Section 29, Hazardous 
Materials Transportation Uniform Safety Act of 1990 (49 U.S.C. 1801-
1819 and 5 U.S.C. 553).

Subpart Z--Toxic and Hazardous Substances

    2. Section 1915.1002 is revised to read as follows:

Sec. 1915.1002 Coal tar pitch volatiles; interpretation of term.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1002 of 
this chapter.

    3. Section 1915.1003 is revised to read as follows:

Sec. 1915.1003  13 carcinogens (4-Nitrobiphenyl, etc.).

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    4. Section 1915.1004 is revised to read as follows:

Sec. 1915.1004  alpha-Naphthylamine.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    5. Section 1915.1006 is revised to read as follows:

Sec. 1915.1006  Methyl chloromethyl ether.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    6. Section 1915.1007 is revised to read as follows:

Sec. 1915.1007  3,3'-Dichlorobenzidiene (and its salts).

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    7. Section 1915.1008 is revised to read as follows:

Sec. 1915.1008  bis-Chloromethyl ether.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    8. Section 1915.1009 is revised to read as follows:

Sec. 1915.1009  beta-Naphthylamine.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    9. Section 1915.1010 is revised to read as follows:

Sec. 1915.1010  Benzidine.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    10. Section 1915.1011 is revised to read as follows:

Sec. 1915.1011  4-Aminodiphenyl.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    11. Section 1915.1012 is revised to read as follows:

Sec. 1915.1012  Ethyleneimine.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    12. Section 1915.1013 is revised to read as follows:

Sec. 1915.1013  beta-Propiolactone.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    13. Section 1915.1014 is revised to read as follows:

Sec. 1915.1014  2-Acetylaminofluorene.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    14. Section 1915.1015 is revised to read as follows:

Sec. 1915.1015  4-Dimethylaminoazobenzene.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    15. Section 1915.1016 is revised to read as follows:

Sec. 1915.1016  N-Nitrosodimethylamine.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    16. Section 1915.1017 is revised to read as follows:

Sec. 1915.1017  Vinyl chloride.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1017 of 
this chapter.

    17. Section 1915.1018 is revised to read as follows:

[[Page 31431]]

Sec. 1915.1018  Inorganic arsenic.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1018 of 
this chapter.

    18. Section 1915.1025 is revised to read as follows:

Sec. 1915.1025  Lead.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1025 of 
this chapter.

    19. Section 1915.1027 is revised to read as follows:

Sec. 1915.1027  Cadmium.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1027 of 
this chapter.

    20. Section 1915.1028 is revised to read as follows:

Sec. 1915.1028  Benzene.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1028 of 
this chapter.

    21. Section 1915.1030 is revised to read as follows:

Sec. 1915.1030  Bloodborne pathogens.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1030 of 
this chapter.

    22. Section 1915.1044 is revised to read as follows:

Sec. 1915.1044  1,2-dibromo-3-chloropropane.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1044 of 
this chapter.

    23. Section 1915.1045 is revised to read as follows:

Sec. 1915.1045  Acrylonitrile.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1045 of 
this chapter.

    24. Section 1915.1047 is revised to read as follows:

Sec. 1915.1047  Ethylene oxide.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1047 of 
this chapter.

    25. Section 1915.1048 is revised to read as follows:

Sec. 1915.1048  Formaldehyde.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1048 of 
this chapter.

    26. Section 1915.1050 is revised to read as follows:

Sec. 1915.1050  Methylenedianiline.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1050 of 
this chapter.

Sec. 1915.1120  [Redesignated as Sec. 1915.1020]

    27. Section 1915.1120 is redesignated as Sec. 1915.1020 and revised 
to read as follows:

Sec. 1915.1020  Access to employee exposure and medical records.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1020 of 
this chapter.

    28. Section 1915.1200 is revised to read as follows:

Sec. 1915.1200  Hazard communication.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1200 of 
this chapter.

    29. Section 1915.1450 is revised to read as follows:

Sec. 1915.1450  Occupational exposure to hazardous chemicals in 
laboratories.

    Note: The requirements applicable to shipyard employment under 
this section are identical to those set forth at Sec. 1910.1450 of 
this chapter.

PART 1926--SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION

Subpart C--General Safety and Health Provisions

    1. The authority citation for Subpart C of part 1926 is revised to 
read as follows:
    Authority: Sec. 107, Contract Work Hours and Safety Standards 
Act (Construction Safety Act) (40 U.S.C. 333); secs. 4, 6, 8, 
Occupational Safety and Health Act of 1970 (29 U.S.C. 653, 655, 
657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 
25059), or 9-83 (48 FR 35736), as applicable.

    2. Section 1926.33 is revised to read as follows:

Sec. 1926.33  Access to employee exposure and medical records.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1020 of 
this chapter.

Subpart D--Occupational Health and Environmental Controls

    3. The general authority citation for subpart D of part 1926 is 
revised to read as follows:

    Authority: Sec. 107, Contract Work Hours and Safety Standards 
Act (Construction Safety Act) (40 U.S.C. 333); secs. 4, 6, and 8, 
Occupational Safety and Health Act of 1970 (29 U.S.C. 653, 655, 
657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 
25059), 9-83 (48 FR 35736), or 1-90 (55 FR 9033), as applicable.
* * * * *
    4. In Sec. 1926.53, paragraphs (c) through (r) are removed and 
reserved and a note is added at the end of the section to read as 
follows:

Sec. 1926.53  Ionizing radiation.

* * * * *
    (c) through (r) [Reserved]

    Note: The requirements applicable to construction work under 
paragraphs (c) through (r) of this section are identical to those 
set forth at paragraphs (a) through (p) of Sec. 1910.1096 of this 
chapter.

    5. Section 1926.59 is revised to read as follows:

Sec. 1926.59  Hazard communication.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1200 of 
this chapter.

    6. In Sec. 1926.60, Appendix A is revised to read as follows:

Sec. 1926.60  Methylenedianiline.

* * * * *

Appendix A to Sec. 1926.60--Substance Data Sheet, for 4-4' 
Methylenedianiline

    Note: The requirements applicable to construction work under 
this Appendix A are identical to those set forth in Appendix A to 
Sec. 1910.1050 of this chapter.
* * * * *
    7. In Sec. 1926.60, Appendix B is revised to read as follows:
* * * * *

Appendix B to Sec. 1926.60--Substance Technical Guidelines, MDA

    Note: The requirements applicable to construction work under 
this Appendix B are identical to those set forth in Appendix B to 
Sec. 1910.1050 of this chapter.

* * * * *
    8. In Sec. 1926.60, Appendix C is revised to read as follows:
* * * * *

Appendix C to Sec. 1926.60--Medical Surveillance Guidelines for MDA

    Note: The requirements applicable to construction work under 
this Appendix C are identical to those set forth in Appendix C to 
Sec. 1910.1050 of this chapter.
* * * * *
    9. In Sec. 1926.60, Appendix D is revised to read as follows:
* * * * *

[[Page 31432]]

Appendix D to Sec. 1926.60--Sampling and Analytical Methods for MDA 
Monitoring and Measurement Procedures

    Note: The requirements applicable to construction work under 
this Appendix D are identical to those set forth in Appendix D to 
Sec. 1910.1050 of this chapter.
* * * * *
    10. In Sec. 1926.60, Appendix E is revised to read as follows:
* * * * *

Appendix E to Sec. 1926.60--Qualitative and Quantitative Fit Testing 
Procedures

    Note: The requirements applicable to construction work under 
this Appendix E are identical to those set forth in Appendix E to 
Sec. 1910.1050 of this chapter.

    11. Section 1926.61 is revised to read as follows:

Sec. 1926.61  Retention of DOT markings, placards and labels.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1201 of 
this chapter.

Subpart E--Personal Protective and Lifesaving Equipment

    12. The authority citation for subpart E of part 1926 continues to 
read as follows:

    Authority: Sec. 107, Contract Work Hours and Safety Standards 
Act (Construction Safety Act) (40 U.S.C. 333); secs. 4, 6, and 8, 
Occupational Safety and Health Act of 1970 (29 U.S.C. 653, 655, 
657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 
25059), 9-83 (48 FR 35736), or 1-90 (55 FR 9033), as applicable; and 
29 CFR part 1911.

Sec. 1926.97 and 1926.98  [Removed and Reserved]

    14. Sections 1926.97 and 1926.98 are removed and reserved.

Subpart F--Fire Protection and Prevention

    15. The authority citation for subpart F of part 1926 continues to 
read as follows:

    Authority: Sec. 107, Contract Work Hours and Safety Standards 
Act (Construction Safety Act) (40 U.S.C. 333); secs. 4, 6, 8, 
Occupational Safety and Health Act of 1970 (29 U.S.C. 653, 655, 
657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 
25059), or 9-83 (48 FR 35736), as applicable.

Sec. 1926.150  [Amended]

    16. In Sec. 1926.150, paragraphs (c)(1)(xi) through (c)(1)(xiv) are 
removed.

Secs. 1926.156 through 1926.159  [Removed]

    17. The undesignated centerheadings preceding Secs. 1926.156 and 
1926.158 and Secs. 1926.156 through 1926.159 are removed.

Subpart Y--Diving

    18. The authority citation of subpart Y of part 1926 continues to 
read as follows:

    Authority: Sections 4, 6, and 8, Occupational Safety and Health 
Act of 1970 (29 U.S.C. 653, 655, 657); sec. 107, Contract Work Hours 
and Safety Standards Act (the Construction Safety Act) (40 U.S.C. 
333); sec. 41, Longshore and Harbor Workers' Compensation Act (33 
U.S.C. 941); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 
(41 FR 25059), 9-83 (48 FR 35736), or 1-90 (55 FR 9033), as 
applicable; 29 CFR part 1911.

    19. Section 1926.1071 is revised to read as follows:

Sec. 1926.1071  Scope and application.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.401 of 
this chapter.

    20. Section 1926.1072 is revised to read as follows:

Sec. 1926.1072  Definitions.

    Note: The provisions applicable to construction work under this 
section are identical to those set forth at Sec. 1910.402 of this 
chapter.

    21. Section 1926.1076 is revised to read as follows:

Sec. 1926.1076  Qualifications of dive team.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.410 of 
this chapter.

    22. Section 1926.1080 is revised to read as follows:

Sec. 1926.1080  Safe practices manual.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.420 of 
this chapter.

    23. Section 1926.1081 is revised to read as follows:

Sec. 1926.1081  Pre-dive procedures.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.421 of 
this chapter.

    24. Section 1926.1082 is revised to read as follows:

Sec. 1926.1082  Procedures during dive.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.422 of 
this chapter.

    25. Section 1926.1083 is revised to read as follows:

Sec. 1926.1083  Post-dive procedures.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.423 of 
this chapter.

    26. Section 1926.1084 is revised to read as follows:

Sec. 1926.1084  SCUBA diving.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.424 of 
this chapter.

    27. Section 1926.1085 is revised to read as follows:

Sec. 1926.1085  Surface-supplied air diving.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.425 of 
this chapter.

    28. Section 1926.1086 is revised to read as follows:

Sec. 1926.1086  Mixed-gas diving.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.426 of 
this chapter.

    29. Section 1926.1087 is revised to read as follows:

Sec. 1926.1087  Liveboating.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.427 of 
this chapter.

    30. Section 1926.1090 is revised to read as follows:

Sec. 1926.1090  Equipment.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.430 of 
this chapter.

    31. Section 1926.1091 is revised to read as follows:

Sec. 1926.1091  Recordkeeping requirements.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.440 of 
this chapter.

    32. Section 1926.1092 is revised to read as follows:

Sec. 1926.1092  Effective date.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.441 of 
this chapter.

    33. Appendix A to Subpart Y is revised to read as follows:

Appendix A to Subpart Y--Examples of Conditions Which May Restrict or 
Limit Exposure to Hyperbaric Conditions

    Note: The requirements applicable to construction work under 
this appendix A are identical to those set forth at Appendix A to 
Subpart T of part 1910 of this chapter.

[[Page 31433]]

    34. Appendix B to Subpart Y is revised to read as follows:

Appendix B to Subpart Y--Guidelines for Scientific Diving

    Note: The requirements applicable to construction work under 
this appendix B are identical to those set forth at Appendix B to 
Subpart T of part 1910 of this chapter.

Subpart Z--Toxic and Hazardous Substances

    35. The authority citation for subpart Z of part 1926 is revised to 
read as follows:

    Authority: Sections 4, 6 and 8, Occupational Safety and Health 
Act of 1970 (29 U.S.C. 653, 655 and 657); Secretary of Labor's Order 
No. 12-71 (36 FR 8754), 8-76 (41 FR 25059), or 1-90 (55 FR 9033), as 
applicable, 29 CFR Part 1911.

    Section 1926.1102 not issued under 29 U.S.C. 655 or 29 CFR part 
1911; also issued under 5 U.S.C. 553.

    36. Section 1926.1102 is revised to read as follows:

Sec. 1926.1102  Coal tar pitch volatiles; interpretation of term.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1002 of 
this chapter.

    37. Section 1926.1103 is revised to read as follows:

Sec. 1926.1103  13 carcinogens (4-Nitrobiphenyl, etc.).

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    38. Section 1926.1104 is revised to read as follows:

Sec. 1926.1104  alpha-Naphthylamine.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    39. Section 1926.1106 is revised to read as follows:

Sec. 1926.1106  Methyl chloromethyl ether.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    40. Section 1926.1107 is revised to read as follows:

Sec. 1926.1107  3,3'-Dichlorobenzidiene (and its salts).

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    41. Section 1926.1108 is revised to read as follows:

Sec. 1926.1108  bis-Chloromethyl ether.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    42. Section 1926.1109 is revised to read as follows:

Sec. 1926.1109  beta-Naphthylamine.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    43. Section 1926.1110 is revised to read as follows:

Sec. 1926.1110  Benzidine.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    44. Section 1926.1111 is revised to read as follows:

Sec. 1926.1111  4-Aminodiphenyl.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    45. Section 1926.1112 is revised to read as follows:

Sec. 1926.1112  Ethyleneimine.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    46. Section 1926.1113 is revised to read as follows:

Sec. 1926.1113  beta-Propiolactone.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    47. Section 1926.1114 is revised to read as follows:

Sec. 1926.1114  2-Acetylaminofluorene.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    48. Section 1926.1115 is revised to read as follows:

Sec. 1926.1115  4-Dimethylaminoazobenzene.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    49. Section 1926.1116 is revised to read as follows:

Sec. 1926.1116  N-Nitrosodimethylamine.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1003 of 
this chapter.

    50. Section 1926.1117 is revised to read as follows:

Sec. 1926.1117  Vinyl chloride.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1017 of 
this chapter.

    51. Section 1926.1118 is revised to read as follows:

Sec. 1926.1118  Inorganic arsenic.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1018 of 
this chapter.

    52. In Sec. 1926.1127, Appendix A is revised to read as follows:

Sec. 1926.1127  Cadmium.

* * * * *

Appendix A to Sec. 1926.1127--Substance Safety Data Sheet

    Note: The requirements applicable to construction work under 
this Appendix A are identical to those set forth in Appendix A to 
Sec. 1910.1027 of this chapter.
* * * * *
    53. In Sec. 1926.1127, Appendix B is revised to read as follows:
* * * * *

Appendix B to Sec. 1926.1127--Substance Technical Guidelines for 
Cadmium

    Note: The requirements applicable to construction work under 
this Appendix B are identical to those set forth in Appendix B to 
Sec. 1910.1027 of this chapter.
* * * * *
    54. In Sec. 1926.1127, Appendix C is revised to read as follows:
* * * * *

Appendix C to Sec. 1926.1127--Qualitative and Quantitative Fit Testing 
Procedures

    Note: The requirements applicable to construction work under 
this Appendix C are identical to those set forth in Appendix C to 
Sec. 1910.1027 of this chapter.
* * * * *
    55. In Sec. 1926.1127, Appendix D is revised to read as follows:
* * * * *

Appendix D to Sec. 1926.1127--Occupational Health History Interview 
With Reference to Cadmium Exposure

    Note: The requirements applicable to construction work under 
this Appendix D are identical to those set forth in Appendix D to 
Sec. 1910.1027 of this chapter.
* * * * *
    56. In Sec. 1926.1127, Appendix E is revised to read as follows:
* * * * *

[[Page 31434]]

Appendix E to Sec. 1926.1127--Cadmium in Workplace Atmospheres

    Note: The requirements applicable to construction work under 
this Appendix E are identical to those set forth in Appendix E to 
Sec. 1910.1027 of this chapter.
* * * * *
    57. In Sec. 1926.1127, Appendix F is revised to read as follows:
* * * * *

Appendix F to Sec. 1926.1127--Nonmandatory Protocol for Biological 
Monitoring

    Note: The requirements applicable to construction work under 
this Appendix F are identical to those set forth in Appendix F to 
Sec. 1910.1027 of this chapter.

    58. Section 1926.1128 is revised to read as follows:

Sec. 1926.1128  Benzene.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1028 of 
this chapter.

    59. Section 1926.1129 is revised to read as follows:

Sec. 1926.1129  Coke oven emissions.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1029 of 
this chapter.

    60. Section 1926.1144 is revised to read as follows:

Sec. 1926.1144  1,2-dibromo-3-chloropropane.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1044 of 
this chapter.

    61. Section 1926.1145 is revised to read as follows:

Sec. 1926.1145  Acrylonitrile.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1045 of 
this chapter.

    62. Section 1926.1147 is revised to read as follows:

Sec. 1926.1147  Ethylene oxide.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1047 of 
this chapter.

    63. Section 1926.1148 is revised to read as follows:

Sec. 1926.1148  Formaldehyde.

    Note: The requirements applicable to construction work under 
this section are identical to those set forth at Sec. 1910.1048 of 
this chapter.

[FR Doc. 96-15051 Filed 6-19-96; 8:45 am]
BILLING CODE 4510-26-P

Complete official Federal Register PDF

FR Doc. 96-14881 Taxpaid Distilled Spirits Used in Manufacturing Products Unfit for Beverage Use (73R-24P)
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31399-31427]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14881]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Bureau of Alcohol, Tobacco and Firearms

27 CFR Parts 17, 19, 70, 170, 194, 197, and 250

[T.D. ATF-379; Re Notice Nos. 634, 649, 748, and 758]
RIN 1512-AA20

Taxpaid Distilled Spirits Used in Manufacturing Products Unfit 
for Beverage Use (73R-24P)

AGENCY: Bureau of Alcohol, Tobacco and Firearms (ATF), Department of 
the Treasury.

ACTION: Final rule, Treasury decision.

-----------------------------------------------------------------------

SUMMARY: This final rule amends and recodifies the regulations on 
taxpaid distilled spirits used to manufacture nonbeverage products. The 
regulations formerly in 27 CFR part 197 (Drawback on Distilled Spirits 
Used in Manufacturing Nonbeverage Products) are recodified as a new 
part, designated 27 CFR part 17. In conjunction with the 
recodification, a number of changes to the drawback regulations have 
been made. Further, the regulations formerly in 27 CFR part 170, 
subpart U (Manufacture and Sale of Certain Compounds, Preparations, and 
Products Containing Alcohol) have been distributed between 27 CFR part 
19 and the new part 17; and conforming amendments have been made in 27 
CFR parts 70, 194, and 250. Significant changes from prior regulations 
are discussed below under SUPPLEMENTARY INFORMATION.

EFFECTIVE DATE: This Treasury decision is effective on August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Steve Simon, Wine, Beer, and Spirits 
Regulations Branch, Bureau of Alcohol, Tobacco and Firearms, 650 
Massachusetts Avenue NW, Washington, DC 20226; (202) 927-8210.

SUPPLEMENTARY INFORMATION:

Notices of Proposed Rulemaking

    On July 29, 1987, ATF published Notice No. 634 in the Federal 
Register (52 FR 28286). That notice proposed the recodification of 
regulations concerning nonbeverage drawback, including changes from the 
former regulations (27 CFR part 197). Public comment was requested 
concerning the proposed changes. A 90-day comment period was provided, 
which ended on October 27, 1987. In response to Notice No. 634, ATF 
received four written public comments. In addition, some review 
comments were received from ATF personnel after the publication of 
Notice No. 634.
    On December 8, 1987, ATF solicited additional public comments 
regarding the nonbeverage drawback regulations. On that date, ATF 
published Notice No. 649 (52 FR 46628), which requested comments 
specifically relating to drawback on nonbeverage products brought into 
the U.S. from Puerto Rico or the Virgin Islands. In conjunction, the 
comment period for Notice No. 634 was extended until January 8, 1988. 
No additional comments concerning Notice No. 634 were received pursuant 
to that extension.
    On August 31, 1992, ATF decided to republish the proposed 
recodification and amendment of 27 CFR part 197. Notice No. 748 was 
published in the Federal Register (57 FR 39536). Because more than 4 
years had elapsed since the end of the previous comment periods, the 
proposed regulations were republished in their entirety, with some 
additional changes, so that anyone else who wished to comment on them 
would have an opportunity to do so.
    Notice No. 748 prescribed a 30-day comment period, which was 
scheduled to end on September 30, 1992. On September 14, 1992, ATF was 
asked to extend this comment period for an additional 90 days. ATF 
partially granted this request. On October 1, 1992, Notice No. 758 (57 
FR 45357) extended the comment period for Notice No. 748 by an 
additional 30 days, until October 30, 1992. The full 90-day extension 
(as requested) was not granted, because most of the same regulatory 
issues had been previously aired for public comment during a sufficient 
length of time. Subsequent to the official ending of the comment 
period, comments that were received while it was still practicable to 
consider them were given consideration.
    In response to Notices No. 748 and 758, comments were received by 
letter, telephone, and personal visit from a total of twelve persons 
representing eleven entities (nine industry members and two industry 
groups). These comments are discussed carefully below, following the 
discussion of comments submitted previously under Notice No. 634.

Public Comments on Notice No. 634

    Comments relating to Notice No. 634 were received from four 
correspondents:
    1. One commenter proposed that Sec. 17.183 be liberalized to allow 
manufacturers to sell or transport byproducts from which alcohol may be 
recovered, without removing the alcohol or adding an appropriate 
substance to prevent the recovery of residual alcohol. The commenter 
was concerned particularly about economic loss from an inability to 
process ``spent'' vanilla beans for food use applications.
    ATF did not adopt this comment, because potable alcohol recovered 
from a nonbeverage manufacturer's byproduct would have been previously 
subject to drawback; thus less than 10% of the tax would remain paid. 
The possible recovery of such potable alcohol by unknown persons would 
present an unacceptable jeopardy to the revenue. Subject to formula 
approval and/or approval of an alternative procedure under Sec. 17.3, 
ATF could allow byproducts containing recoverable alcohol to be 
subjected to additional processing, on the manufacturer's premises, for 
food use applications.
    The basis for Sec. 17.183 in this final rule is ATF Ruling 81-8, 
1981-4 QB 24. That ruling provided a liberalized procedure for the 
disposition of spent vanilla beans, whereby they could be treated with 
any substance that the manufacturer deemed adequate to make

[[Page 31400]]

recovery of potable alcohol impractical. This procedure has been 
broadened in Sec. 17.183 to apply to the disposition of any byproduct 
from which alcohol can be recovered. However, under the broadened rule, 
prior approval from ATF must be obtained for treatment with substances 
not previously authorized.
    In Sec. 17.183(c), certain substances are authorized for treatment 
of spent vanilla beans. No further authorization is needed for the use 
of these substances, when disposing of spent vanilla beans. Approval is 
required if other substances will be added to such beans, or if other 
byproducts from which alcohol can be recovered will be disposed of. 
Manufacturers who have already received approval for other methods of 
disposal, not mentioned in Sec. 17.183, may continue to operate under 
such approval.
    2. Another commenter expressed support for some of the proposals of 
Notice No. 634, but he had reservations about several others. He 
requested that ATF review the nonbeverage industry's ``historical 
compliance track record'' before imposing new recordkeeping 
requirements concerning usage of finished products (Sec. 17.166); he 
questioned the revised definition of ``distilled spirits'' in 
Sec. 17.11 as being different from the definition of the same term in 
27 CFR part 5; and he sought a ``transition period'' for the 
implementation of new language in Sec. 17.161 (dealing with general 
requirements for records).
    ATF reviewed the compliance record of the nonbeverage manufacturing 
industry and determined that the new records in Sec. 17.166(b), 
concerning usage of nonbeverage products, are needed to verify that 
such products were manufactured in the amount claimed. The new records 
close a gap in the recordkeeping system of the former part 197. 
(However, see the further discussion of this issue below, in 
conjunction with a comment submitted pursuant to Notice No. 748.)
    The revised definition of ``distilled spirits'' was also kept 
unchanged, because the revised definition is consistent with the 
definition of ``distilled spirits'' in the Internal Revenue Code (26 
U.S.C. 5002(a)(8)). The nonbeverage drawback regulations are issued 
under the Internal Revenue Code, while 27 CFR part 5 is a regulation 
under the Federal Alcohol Administration Act. The revised definition in 
part 17 differs from the former definition in part 197 only by the 
deletion of the words ``fully taxpaid or tax determined at the 
distilled spirits rate.'' This change brings the definition closer both 
to 26 U.S.C. 5002(a)(8) and to the ordinary meaning of ``distilled 
spirits.'' Whenever taxpaid distilled spirits are specifically intended 
in part 17, the word ``taxpaid'' is stated. A new definition of 
``taxpaid'' is provided in Sec. 17.11.
    Finally, ATF determined that there is no need for a transition 
period for implementation of new language in Sec. 17.161, because the 
only substantive change brought about by that new language is 
liberalizing. That change makes it clear that normal business records, 
including invoices and cost accounting records, are adequate for 
regulatory purposes if they contain the required information. (ATF 
anticipates that ordinarily no records besides these normal business 
records need be maintained for purposes of compliance with the 
regulations.) Other new language in Sec. 17.161 does not impose a 
substantive requirement, but simply spells out the purposes of records.
    3. A third commenter pointed out what appeared to him to be 
contradictions in the proposed regulations. However, the apparent 
contradictions were actually the result of misunderstanding. In one 
instance, the commenter confused the terms ``eligible for drawback'' 
and ``subject to drawback.'' In order to prevent further confusion of 
this sort, definitions of both of these terms were included in Notice 
No. 748 and remain in this final rule (see Sec. 17.11).
    Another point of confusion concerned the difference between spirits 
contained in an intermediate product and spirits consumed in the 
manufacture of such a product. Spirits contained in an intermediate 
product are eligible for drawback, and become subject to drawback when 
the intermediate product is used in the manufacture of a nonbeverage 
product. However, spirits consumed in the manufacture of an 
intermediate product (which are not contained in that product when 
completed) never become subject to drawback. Drawback cannot be claimed 
on such spirits (see Secs. 17.154 and 17.155). Nevertheless, under 
Secs. 17.127 and 17.185, a manufacturer may treat the intermediate 
product as an unfinished nonbeverage product; then the consumed spirits 
may be included in a drawback claim.
    4. A fourth commenter took issue with the standard used by ATF to 
determine whether to grant drawback of tax on spirits used in 
nonbeverage products. He questioned the requirement that products 
produced with spirits must be ``unfit for beverage use.'' The commenter 
asked that this be changed to ``sale and use for (non) beverage 
purposes.''
    This commenter's requested change was not adopted, because the 
standard that must be met in order to receive drawback is expressly 
stated in the law (26 U.S.C. 5131(a)). Drawback may be granted only for 
``distilled spirits on which the tax has been determined, (used) in the 
manufacture or production of medicines, medicinal preparations, food 
products, flavors, flavoring extracts, or perfume, which are unfit for 
beverage purposes'' (emphasis added).

Public Comments on Notice No. 748

    The following paragraphs discuss the suggested changes that were 
submitted in response to Notice No. 748 (as amended by Notice No. 758). 
The comments are grouped topically, since in some cases several 
commenters proposed the same or similar recommendations.
    1. Section 17.136 states that ``A product is not a medicine, 
medicinal preparation, food product, flavor, flavoring extract, or 
perfume for nonbeverage drawback if its formula would violate a ban or 
restriction of the U.S. Food and Drug Administration (FDA) pertaining 
to such products.'' This reflects a longstanding ATF policy. See Rev. 
Rul. 58-350, 1958-2 CB 974; see also various regional industry 
memoranda in 1991 regarding FD&C Red No. 3, and the following Industry 
Circulars: 61-2, 62-33, 65-4, 70-12, 72-8, 72-28, 72-29, 73-6, and 76-
17.
    However, a group of commenters pointed out that the wording of 
Sec. 17.136 could be interpreted to prevent manufacturers from 
receiving drawback on products intended for export to countries with 
different food and drug requirements. Further, certain products for 
domestic use, such as tobacco flavors and animal feed flavors, are not 
subject to the same requirements as products intended for internal 
human consumption. Products may legally be made for such uses even 
though banned for human consumption.
    ATF appreciates this comment. Since the limitation of Sec. 17.136 
only applies to products that violate FDA bans or restrictions, it is 
not intended to prevent drawback in the situations mentioned by the 
commenters. In general, there would be no FDA violations in those 
situations. Therefore, language has been added to Sec. 17.136 in this 
final rule to clarify this point.
    2. Another suggestion pertained to Sec. 17.166(b). This new 
regulation requires records of ``other disposition'' of nonbeverage 
products--that is, disposition other than by sale. Former regulations 
in 27 CFR 197.130 only

[[Page 31401]]

required disposition records for products disposed of by sale; 
Sec. 17.166(b) closes this gap in the recordkeeping system.
    However, a change in Sec. 17.166(b)(1) introduced by Notice No. 
748, adding some language which had not been present in Notice No. 634, 
was a cause of concern for several commenters. This change added a 
proposed requirement that would have applied whenever a nonbeverage 
product is disposed of by being used as an ingredient in other 
products. The new language would have required disposition records, in 
such instances, to show the formula number of every other product in 
which the first product was used as an ingredient. The commenters 
stated that a requirement to show such formula numbers would be onerous 
for many flavor companies who frequently use their flavors as 
ingredients in many other flavors.
    The purpose of the proposed requirement added by Notice No. 748 was 
to enable an ATF inspector to follow the ``audit trail'' to the next 
product and compare its batch records, showing usage of the first 
product, with the first product's records of disposition. This 
inspection technique had been facilitated under the former regulations 
in part 197 by a requirement that supporting data (submitted with each 
claim) show, for each product manufactured, the formula number of each 
nonbeverage or intermediate product used as an ingredient. That 
requirement was eliminated from the simplified supporting data proposed 
by Notice No. 748 (and adopted by this final rule), but its absence 
would have been more than made up for by the proposed additional 
language in Sec. 17.166(b)(1).
    After carefully considering this public comment, ATF has decided 
that the benefits of the proposed additional requirement in 
Sec. 17.166(b)(1) may not be commensurate with the added burden to 
industry. Therefore, in this final rule, Sec. 17.166(b)(1) reads as it 
did in Notice No. 634, without the formula-number requirement added by 
Notice No. 748. However, ATF reserves the right to examine this issue 
further and possibly to propose another rulemaking, if experience shows 
that the formula-number requirement, or something similar, is needed 
for adequate administration of the law.
    3. Two commenters requested permission to continue using the old 
supporting data, as prescribed under Rev. Proc. 64-32, 1964-2 CB 951, 
and former regulations (27 CFR 197.110-197.119). Even though the new 
supporting data prescribed by this final rule is much simpler, some 
companies have computerized their system, and it would actually be a 
hardship for them to have to change.
    Section 17.147 allows modifications of the supporting data to be 
used without prior permission, if the modified form contains all of the 
required information. For the most part, the old supporting data 
contains all of the information required under this final rule. There 
are only a few new elements, which include: A certification that 
required physical inventories have been taken, separate data for 
different effective tax rates and for Puerto Rican and U.S. Virgin 
Islands spirits and imported rum, and certain explanatory information 
sometimes required in Part IV of the new form. Therefore, drawback 
claimants may continue to use the old supporting data as long as the 
new elements are included.
    4. Another comment stated an objection to the requirement for 
physical inventories (Sec. 17.167). The commenter claimed that physical 
inventories were not required under part 197. However, that is not so. 
Physical inventories were mentioned in Secs. 197.116-197.119, with the 
intent that they should be taken every claim period. Such inventories 
are necessary from time to time to ensure the accuracy of the book 
account. In line with the principles of the Administration's 
``Reinventing Government'' regulatory initiative, ATF has determined 
that claimants with bond coverage need not be required to take a 
physical inventory every month (as proposed in Notices No. 634 and 
748). Therefore, this final rule provides for quarterly physical 
inventories.
    5. Some other suggested improvements were related to the proposed 
revision of the formula form (previously numbered ATF F 1678, now ATF F 
5154.1). A draft version of this form was published in the same issue 
of the Federal Register as Notice No. 748 (see 57 FR 39564). First, the 
commenter requested additional space for addresses when a single form 
is filed for multiple plants; but this is not necessary, since adequate 
space is provided on the reverse of the form. (The reverse was not 
printed in the Federal Register, since it is virtually a blank page.) 
If the reverse is still not sufficient, a continuation on plain paper 
is acceptable.
    Also, the commenter suggested that ATF F 5154.1 be redesigned for 
computer-generated insertion of data. However, he did not propose any 
specific changes. If a claimant has a specific proposal for a computer-
generated form, it could be approved as an alternate procedure under 
Sec. 17.3. In a separate project, ATF has developed a computer program 
to facilitate the preparation of nonbeverage product formulas, which is 
available for use by industry members. For more information on this 
project, please contact the ATF Laboratory or the person listed above 
under FOR FURTHER INFORMATION CONTACT.
    6. Another suggestion proposed a simplified procedure for 
alternation of premises between a distilled spirits plant and a 
nonbeverage product manufacturing plant. This suggestion cannot be 
considered at this time, since it relates to other regulations that are 
not the subject of this rulemaking. This comment will be treated as a 
suggestion for future amendment of 27 CFR part 19.
    7. Another comment pointed out that the last sentence of 
Sec. 17.137 (requiring qualification as a distilled spirits plant) 
should be limited to products that are disapproved as ``fit for 
beverage use.'' This comment is well taken. Under Sec. 19.58, as 
amended by this final rule, exemption from qualification requirements 
is provided to manufacturers of various products that are unfit for 
beverage use, which nevertheless would not be approved for drawback 
because they are not medicines, medicinal preparations, flavors, 
flavoring extracts, food products, or perfume. Therefore, the suggested 
change has been made.
    8. Several comments addressed the procedure for determining whether 
products are fit or unfit for beverage use (Sec. 17.134). It was stated 
that the use of an organoleptic examination (taste test) performed by 
ATF is not sufficiently objective and ``can result in a very arbitrary 
tasting method with unpredictable results.''
    As an alternative to the method currently used, one commenter 
suggested the use of an independent testing panel funded by industry. 
The commenter opined that such a panel might be more ``objective'' and 
might alleviate the problem of delays in formula approvals caused by a 
backlog of submissions at the ATF Laboratory.
    Interestingly, this particular idea (absent the funding proposal) 
had been previously considered by ATF pursuant to a suggestion 
submitted by two ATF employees. At that time, ATF determined that the 
panel would have to be restricted to analysis of samples, since most 
industry members would be opposed to allowing an independent laboratory 
to see their formulas. Additionally, it was determined that training 
and certification by ATF would be necessary, thus minimizing any time 
and cost savings to the Government. These findings are still considered 
to be valid.

[[Page 31402]]

    Furthermore, ATF disagrees that a panel funded by industry would be 
any more objective than the taxpayer-funded ATF Laboratory. On the 
contrary, industry funding would seem to introduce a possibility for 
bias not currently present. ATF has no interest to be served by 
approving or disapproving any particular formula. Our only interest is 
to administer the law on an impartial basis. An element of subjectivity 
(but not bias) is unavoidably present due to the legal requirement that 
products be ``unfit for beverage use.'' This cannot be eliminated 
merely by shifting the responsibility for decision-making to another 
entity. Therefore, ATF has decided not to adopt this suggestion.
    Another commenter proposed a different alternative. This one 
suggested that ATF incorporate a ``standard reference method'' for 
organoleptic examination based on a method prescribed by the American 
Society for Testing and Materials (ASTM). The method recommended by the 
commenter is as follows:

    Samples: (1) Non-Beverage Test (NBT) sample(s)--Formulate six or 
fewer samples over a range of dilution levels of the NBT component 
in 15% ethanol. (2) Non-Beverage Reference (NBR) and Beverage 
Reference (BR) samples--From the list of ingredients and amounts in 
Table 1 (i.e. a table listing ingredients and their quantities 
recognized by ATF as usually sufficient to make products unfit for 
beverage use), select and formulate one sample for a NBR at 15% 
ethanol. Reduce the amount of the respective ingredient in the NBR 
sample to formulate a BR sample that would be deemed potable.
    Procedure: (1) Recruit a panel of at least 15 members previously 
screened as outlined below.
    (2) Each panelist is presented the NBR and BR samples as 
examples of a nonpotable and potable beverage, respectively.
    (3) Each panelist is then presented in random order each NBT 
sample for comparison in acceptablility to the NBR and BR sample.
    (4) Each panelist responds to the question, ``Is this sample 
more like the NBR or BR sample in acceptability?''
    (5) Count the number of panelists scoring each NBT sample as 
more like the BR sample in acceptability.
    (6) Use the statistical tables for the duo-trio difference test 
(from ASTM ``Manual on Sensory Testing Methods, STP 434'') to 
conclude which NBT samples are potable. Determine significance at 
the 95% confidence level.
    (7) Report the highest concentration of the nonbeverage 
component that is significant as an upper bound in concentration of 
the NBT component for potability.
    Panelist Screening: (1) Present both the NBR and BR samples to a 
prospective panelist.
    (2) Ask the question, ``Which sample is more acceptable to 
you?''
    (3) Screen out any panelists which select the NBR sample.

    ATF has reviewed this proposed method and finds it unacceptable for 
several reasons. First, the method does not test for the specific 
information needed for drawback determinations under 26 U.S.C. 5131. 
The proposal is, in effect, a test for determining what concentration 
of a single ``component'' is needed to render an ethanol solution 
nonpotable. However, in making drawback determinations, ATF is not just 
interested in the contribution to potability by a specific component; 
rather, ATF is interested in the resulting potability of a product, 
which may contain many components. Further, ATF is not interested in 
quantitating the level of concentration at which a solution becomes 
nonpotable; rather, ATF is just interested in determining, yes or no, 
whether a particular final product is fit for beverage use. In other 
words, the proposed method provides extraneous, unnecessary information 
while simultaneously failing to provide the particular information that 
ATF needs.
    Secondly, the proposed method does not even provide a definitive 
determination whether a particular sample is beverage or nonbeverage. 
It only provides a determination whether the sample is ``more like'' 
the ``beverage reference'' or the ``nonbeverage reference.'' If one of 
the two reference samples is closer than the other to the border 
separating beverage from nonbeverage, the test sample may in fact be 
``more like'' one of them even though it is on the opposite side of 
that border. For example, imagine that on a scale of 1-100, the 
separation between beverage and nonbeverage occurs at 50. If the 
beverage reference is at 40 and the nonbeverage reference is at 75, a 
test sample at 55 will taste ``more like'' the beverage reference even 
though the sample is in fact nonbeverage.
    Thirdly, the composition of the proposed panel would not be 
appropriate. As the example just given shows, it is important for the 
panel to understand the real difference between beverage and 
nonbeverage, not merely whether a sample is ``more like'' one or the 
other. This implies a panel with expertise, not just a panel of random 
individuals. Though not explicitly stated, it is implied that the 
proposed method would utilize randomly selected individuals. By 
contrast, the panelists used by ATF are all university-trained 
chemists, who receive a minimum of 1 year of special training at the 
ATF Laboratory before their vote is given full weight in drawback 
approval determinations. This ensures maximum consistency and 
continuity over time in application of the ``unfit for beverage use'' 
standard.
    Because ATF uses expert panelists, it is not necessary to empanel a 
minimum of 15. In most cases, a panel of two is sufficient for a 
definitive determination. If a sample is at all borderline, additional 
panelists are recruited up to a maximum of 12. At least \2/3\ of them 
must agree that the sample is unfit for beverage use. By this method, 
the eight chemists of the ATF Laboratory's Nonbeverage Section (aided 
when necessary by the eight chemists of the Beverage Alcohol Section) 
are able to examine about 2,400 samples per year. This is in addition 
to their other work, which includes chemical analyses and examination 
of thousands of formulas submitted without samples.
    Therefore, although ATF appreciates the effort put into devising 
the proposed new method, we have concluded that it is in no way 
superior to the method currently being used.
    Accordingly, Sec. 17.134 is adopted by this final rule without 
change from Notice No. 748. ATF hopes that the information in this 
section will be used by manufacturers to identify and ``weed out'' 
products that are clearly fit for beverage use.
    9. Finally, a commenter requested that ATF publish, in Sec. 17.137, 
a list of ingredients and their quantities that are recognized by the 
ATF Laboratory as usually sufficient to make products unfit for 
beverage use. The commenter was referring to the following Guidelines, 
which were distributed to attendees at an ATF-sponsored industry 
seminar:

----------------------------------------------------------------------------------------------------------------
                 Ingredient                                                 Amount                              
----------------------------------------------------------------------------------------------------------------
Citric Acid.................................  If ethanol less than 30%, acid = 0.1  x  ethanol content (% v/v) +
                                               0.5.                                                             
                                              If ethanol greater than 30%, acid = 0.1  x  ethanol content (% v/ 
                                               v).                                                              
Salt........................................  3.2 grams salt per 100 ml at 45% ethanol (more for greater        
                                               ethanol).                                                        
Vanillin....................................  1 oz. per gallon at 30% ethanol.                                  
Ethyl Vanillin..............................  0.4 oz. per gallon at 30% ethanol.                                

[[Page 31403]]

                                                                                                                
Propylene Glycol............................  Equal amounts by volume of propylene glycol and ethanol.          
Ethyl Acetate...............................  2.0% by volume at 90% ethanol.                                    
Maltol......................................  5% at 90% ethanol.                                                
Essential Oils..............................  Most are unfit at a level of 3% in 90% ethanol. An exception is   
                                               anise oil which needs 4.2%. Many 1% solutions of essential oils  
                                               are unfit.                                                       
Benzaldehyde................................  1.2 oz. benzaldehyde or bitter almond oil per gallon at 90%       
                                               ethanol.                                                         
----------------------------------------------------------------------------------------------------------------

    ATF agrees that this information should be widely distributed among 
nonbeverage industry members; however, the problem with publishing it 
in the regulations is that it can only be a guide, not applicable to 
all products. If it were contained in regulations, industry members 
would tend to assume that if their products met the guidelines, they 
would automatically be approved for drawback. No such guarantee can be 
provided. (For example, products meeting the citric acid guidelines may 
nonetheless be fit for beverage use if they contain sufficient sugar.) 
Therefore, ATF has decided to publish this information as a future 
Industry Circular, rather than as an amendment to the regulations.

Other Changes From Former Regulations

    Other changes, proposed in Notice No. 748, were not the subject of 
public comment. Except as noted, they have been adopted substantially 
as proposed.
    1. Adoption of Rulings. The holdings of certain Revenue Rulings and 
ATF Rulings are reflected in the final regulations, as follows: Rev. 
Rul. 55-689, 1955-2 CB 729 (Sec. 17.187); Rev. Rul. 56-239, 1956-1 CB 
715 (Sec. 17.135); Rev. Rul. 56-314, 1956-2 CB 1023 (Sec. 17.137); Rev. 
Rul. 56-335, 1956-2 CB 1024 (Sec. 17.181); Rev Rul. 56-336, 1956-2 CB 
1023 (Sec. 17.182); Rev. Rul. 56-367, 1956-2 CB 1026 
(Sec. 17.135(b)(2)); Rev. Rul. 56-394, 1956-2 CB 1021 (Sec. 17.152(c)); 
Rev. Rul. 56-395, 1956-2 CB 1025 (Sec. 17.186); Rev. Rul. 58-350, 1958-
2 CB 974 (Sec. 17.136); Rev. Rul. 63-87, 1963-1 CB 384 (Secs. 17.11: 
new definition of ``food products,'' and 17.133(d)); Rev. Rul. 69-138, 
1969-1 CB 327 (Secs. 17.126(b) and 17.152(a), (c), and (d)); ATF Rul. 
73-1, 1973 ATF CB 85 (Sec. 17.133(b)); ATF Rul. 74-2, 1974 ATF CB 27 
(Sec. 17.76); ATF Rul. 76-17, 1976 ATF CB 85 (Secs. 17.151 and 
17.152(b)); ATF Rul. 76-19, 1976 ATF CB 86 (Secs. 17.169 and 
17.185(b)); ATF Rul. 77-27, 1977 ATF CB 165 (Sec. 17.122); and ATF Rul. 
82-7, 1982-2 QB 46 (Sec. 17.11: new definition of ``medicines'').
    Rev. Rul. 57-369, 1957-2 CB 948, has been adopted in the 
instructions to the revised ATF Form 5154.1 (formerly Form 1678). Rev. 
Rul. 58-317, 1958-1 CB 586, is not reflected in the regulations; it is 
obsolete since iso-alcoholic elixir has been removed from the National 
Formulary. Rev. Rul. 58-428, 1958-2 CB 975, is also not reflected in 
the regulations, because the repeal of 26 U.S.C. 5082 has removed its 
authority. The holding of ATF Rul. 81-8, 1981-4 QB 24, has been 
modified in Sec. 17.183 (see discussion above, under ``Public Comments 
on Notice No. 634''). Revenue Procedure 64-32, 1964-2 CB 951, has been 
replaced by the new supporting data form (ATF Form 5154.2), per 
Sec. 17.147.
    2. Form number changes. The prescribed form entitled ``Formula and 
Process for Nonbeverage Products'' has been revised and renumbered from 
1678 to 5154.1. This will not require resubmission of any formulas 
previously approved on Form 1678. Similarly, the form number of the 
``Bond for Drawback Under 26 U.S.C. 5131'' is being changed from 1730 
to 5154.3, but this will not require resubmission of any bonds 
previously approved.
    3. Alternate methods or procedures. A new section (Sec. 17.3) has 
been added to provide for the employment of alternate methods or 
procedures, if approved by the Director pursuant to a showing of the 
conditions stated in the regulation.
    4. Incorporation by reference. Former Sec. 197.3 is not included in 
this final rule, because consultation with the Office of the Federal 
Register indicated that the use of the National Formulary, United 
States Pharmacopeia, and Homeopathic Pharmacopoeia of the United States 
does not amount to an incorporation by reference. Although Sec. 17.132 
makes a ``reference'' to these books, there is no ``incorporation'' of 
them into the regulations. There is merely an authorization, for 
manufacturers who so choose, to utilize formulas from them as approved 
formulas without the necessity of submitting ATF Form 5154.1.
    Incorporation by reference with the approval of the Director of the 
Federal Register under 5 U.S.C. 552(a)(1) is intended to be a 
substitute for the reprinting of material required to be published in 
the Federal Register under Sec. 552(a)(1)(A)-(E). However, the 
authorization for manufacturers to make use of the N.F., U.S.P., and 
H.P.U.S. on a voluntary basis does not entail a requirement for ATF to 
publish the contents of those books in the Federal Register. It is true 
that a manufacturer who has chosen to adopt a formula from the N.F., 
U.S.P., or H.P.U.S. may be subject to a $1,000 fine if he subsequently 
fails to follow it (Sec. 17.148). However, the enforcement of this 
requirement does not require publication of that formula, any more than 
similar enforcement of the manufacturer's own proprietary formulas 
requires their publication. The enforcement in each instance pertains 
to the manufacturer's choice of a formula, rather than to the contents 
of the N.F., U.S.P., and H.P.U.S. per se.
    5. Signature authority. Section 17.6, generalized from certain 
provisions in former Secs. 197.30 and 197.67(a), states the rule as to 
when evidence of signature authority is required.
    6. Delegations of authority. Authorities vested in the Director by 
part 17 may be delegated, through delegation orders, to subordinate 
officials. This possibility is reflected in the definition of 
``Director'' in Sec. 17.11 by addition of the words ``or his or her 
delegate.'' ATF's Alcohol and Tobacco Laboratory is specified in 
Secs. 17.121, 17.122, 17.126, 17.131, 17.132, and 17.136 as the 
recipient of certain documents, such as formulas. Accordingly, a new 
definition of ``Alcohol and Tobacco Laboratory,'' giving its address, 
is provided in Sec. 17.11.
    7. New and modified definitions. For clarity, some new definitions 
are added in Sec. 17.11. Besides those mentioned elsewhere in this 
preamble, there are new definitions of ``approved,'' ``CFR,'' 
``month,'' ``person,'' ``proof gallon,'' ``quarter,'' ``recovered 
spirits,'' and ``this chapter.'' With respect to the definitions of 
``month'' and ``quarter,'' claimants desiring to use slightly different 
time periods may apply under Sec. 17.3. (Existing approvals remain in 
effect.) The definitions of ``director of the service center,'' 
``district director'' (an I.R.S. official), ``total annual 
withdrawals,'' and ``year'' in former Sec. 197.5 have been deleted as 
unnecessary. The definitions of ``used'' and ``time distilled spirits 
are used'' are in regulations Secs. 17.151 and 17.152. The

[[Page 31404]]

definition of ``nonbeverage products'' in Sec. 17.11 has been modified 
to reflect the addition of perfume to the list of products that may be 
approved for drawback. (Pub. L. 103-465, Sec. 136(a).) Elsewhere in 
this final rule, wherever the types of nonbeverage products are listed, 
this addition of perfume is reflected as well. ATF is in the process of 
delegating authority under its new organizational structure; however, 
this process is not yet complete; therefore, the definition of 
``regional director (compliance)'' and the use of that term throughout 
this final rule are retained.
    8. Time for payment of special tax. A sentence has been added in 
Sec. 17.24 to clarify when a payment of special tax is considered late. 
Under 26 U.S.C. 5131, special tax is a prerequisite for drawback 
eligibility. Therefore, no penalty under 26 U.S.C. 5134(c) will be 
imposed as long as special tax is paid before completion of final 
action on the claim.
    9. Retention of special tax stamps. Former regulations did not 
specify a retention period for special tax stamps. These final 
regulations (Sec. 17.55) make the retention period the same as for 
other required records and documents (generally 3 years). The retention 
period for the list of multiple business locations, which was 2 years 
under former Sec. 197.28, has also been made the same as for other 
documents (Sec. 17.31).
    10. Reincorporation. A new Sec. 17.77 has been added, stating that 
when an existing corporation or corporations are reorganized into a new 
corporation, a new special tax must be paid. This new section is 
similar to regulations for liquor dealers in Sec. 194.163. Although 
Sec. 17.77 states the general rule, there may be exceptions. For 
instance, ATF has ruled that a reorganization under 26 U.S.C. 
368(a)(1)(F), consisting of a mere change in identity, form, or place 
of organization of one corporation, however effected, does not require 
a new special tax. If there is a question as to whether a new special 
tax is required, the ATF Tax Processing Center, (513) 684-6580, should 
be consulted.
    11. Amount of bond for monthly claims. The wording of former 
Sec. 197.107 allowed for the possibility that the amount (or ``penal 
sum'') of a bond might be reduced due to frequent on-site inspections. 
This concept has become obsolete, since today no claimant is regularly 
inspected as frequently as quarterly. Therefore, under these final 
regulations (Sec. 17.102), bonds for monthly claims must cover the 
total drawback claimed during any quarter. It is not anticipated that 
this change will affect the required bond coverage of any current 
monthly claimant.
    12. Time for filing formulas. Language in former Sec. 197.95, 
respecting time for filing formulas, has been revised in Sec. 17.121(b) 
to express more clearly the statutory requirement of 26 U.S.C. 5131-
5134. Both formula and claim must be filed within ``6 months next 
succeeding the quarter in which the distilled spirits covered by the 
claim were used'' (26 U.S.C. 5134(b)). However, if there is any doubt 
about a product's eligibility for drawback, it is preferable that the 
formula be filed and approved before commencement of manufacture.
    13. Formulas for use at multiple plants. The revised formula form 
(ATF F 5154.1) permits a manufacturer to file a single formula for use 
at more than one plant, if the plants at which the formula will be used 
are listed on the form. This change is reflected in Sec. 17.121(c).
    14. Adoption of predecessor's formulas. Former Sec. 197.99 allowed 
the adoption of a predecessor's formulas (for continued use at the same 
plant, when its ownership changes) by filing a notice listing the 
formulas' serial numbers, names, and dates of approval. This final rule 
(Sec. 17.125(a)) only requires the notice of adoption to list the names 
and serial numbers. The notice must be filed with the regional director 
(compliance). Further, since copies of the articles of incorporation or 
other documents are necessary to prove the change of ownership, a 
sentence has been added to include this general requirement.
    15. Adoption of manufacturer's own formulas from another plant. 
Adoption of a company's own formulas for use at another of its plants, 
including adoption by a parent company of formulas of its wholly owned 
subsidiary, and vice versa, is a new option provided by this final 
rule. (See Sec. 17.125(b).) Previous regulations did not provide for 
this. The procedure for this type of adoption is to submit a letterhead 
notice to the ATF Laboratory, accompanied by two photocopies of the 
formula to be adopted and some evidence of the relationship between the 
plants. After verifying the formulas, the ATF Laboratory will forward 
the notice to the regional director (compliance). The adopting plant is 
also required to reference the notice in its first claim relating to 
the adopted formula(s).
    16. Formulas for intermediate products. ATF needs to know all 
ingredients that will enter into the finished nonbeverage product. 
Therefore, these final regulations (Sec. 17.126) require the submission 
of formulas on ATF Form 5154.1 (formerly 1678) for intermediate 
products, unless the formula for an intermediate product is written as 
part of the approved formula for the nonbeverage product(s) in which 
the intermediate product will be used. (If the formula for the 
intermediate product is written as part of the nonbeverage product's 
formula, the intermediate product is treated as an unfinished 
nonbeverage product; see discussion below.)
    17. Self-manufactured ingredients optionally treated either as 
intermediate products or as unfinished nonbeverage products. Spirits 
consumed in the manufacture of intermediate products are not subject to 
drawback, both under former regulations (Sec. 197.119) and this final 
rule (Sec. 17.155). If spirits are recovered in the manufacture of 
intermediate products, drawback may be claimed, but only if and when 
the spirits are subsequently reused in the manufacture of a nonbeverage 
product (Sec. 197.118 in former regulations and Sec. 17.153(a) in this 
final rule). These restrictions are necessary for protection of the 
revenue, because when spirits are consumed or recovered in the 
manufacture of an intermediate product, it could be difficult or 
impossible to correlate the quantity of such spirits with the 
production of a batch of finished nonbeverage product in which the 
intermediate was used.
    However, in some instances, the manufacture of an intermediate 
product requires consumption of significant quantities of spirits that 
are not ultimately contained in that intermediate product. The 
inability to claim drawback on such spirits would be a hardship. 
Therefore, manufacturers have been permitted to resubmit their formulas 
to show production of the intermediate product as an integral part of 
the formula for the related nonbeverage product. If this is done, the 
former intermediate product is regarded instead as an unfinished 
nonbeverage product; consequently, spirits necessarily consumed (or 
recovered) in its manufacture are regarded as consumed (or recovered) 
in the manufacture of a nonbeverage product and are subject to 
drawback. This procedure protects the Federal revenue, because each 
batch of unfinished nonbeverage product is restricted to use in a 
specific batch of a predetermined finished product and must be so used 
within the time period specified in the approved nonbeverage product's 
formula.
    Although this procedure was available under former regulations, 
many manufacturers were not aware of it, because it was not described 
in the

[[Page 31405]]

regulations. In order to inform manufacturers of this procedure, it is 
described in Secs. 17.127 and 17.185 of these final regulations. 
Manufacturers are given the option to designate their self-manufactured 
alcoholic ingredients as either intermediate products or unfinished 
nonbeverage products. There are advantages and disadvantages that go 
with each choice.
    The advantage of designating an ingredient as an unfinished 
nonbeverage product is that spirits recovered or consumed in the 
manufacture of the ingredient are subject to drawback in the same way 
as other spirits recovered or consumed in the manufacture of 
nonbeverage products. The disadvantages of this designation are: (1) 
Each batch of the ingredient must be used within a limited time in a 
single batch of a predetermined nonbeverage product. (2) The ingredient 
cannot be transferred to another plant under Sec. 17.185(b). (This 
restriction is due to the necessity of a single, unified batch record, 
which must be maintained at the place of production.)
    Conversely, the advantages of designating an ingredient as an 
intermediate product are: (1) Several batches may be accumulated, 
stored indefinitely, and used in the manufacture of any nonbeverage 
product whose formula calls for their use. Less (or more) than a full 
batch of such a product may be used to produce a batch of a finished 
nonbeverage product. (2) Ingredients designated as intermediate 
products may be transferred to another branch or plant of the same 
manufacturer under Secs. 17.169 and 17.185. (3) For manufacturers who 
already have intermediate product formulas on file, another advantage 
of the ``intermediate product'' designation is that no new formula or 
procedural changes would be required. But the disadvantage of that 
designation is that spirits consumed or recovered in production of the 
intermediate product may not be claimed for drawback.
    18. Subpart U of 27 CFR part 170. Subpart U of 27 CFR part 170, 
which provided exemptions from special tax and qualification 
requirements for manufacturers and sellers of certain products that are 
unfit for beverage use, is being revoked, but the material from that 
subpart has not been entirely eliminated. Material related exclusively 
to drawback manufacturers has been incorporated in the new part 17. 
Some material has been eliminated, either as unnecessary or as covered 
by other regulations. The remaining material has been relocated into 
subpart D of part 19 (see new Sec. 19.58; this section is grouped under 
a new centerheading, ``Activities Not Subject to this Part,'' along 
with former Sec. 19.69, which is redesignated as Sec. 19.57). 
Conforming amendments have also been made in 27 CFR parts 70 and 194. 
Former Sec. 170.613(a)(6) (``Salted wines'') was previously 
incorporated into 27 CFR 24.215 by T.D. ATF-299 (55 FR 24974). Sections 
in part 17 containing language from former subpart U of part 170 are: 
Secs. 17.132, 17.133, and 17.168.
    19. Submission of quantitative formulas. This change strengthens 
requirements respecting submission of formulas for nonbeverage drawback 
products. Regulations allow formulas prescribed by the United States 
Pharmacopeia (U.S.P.), the National Formulary (N.F.), and the 
Homeopathic Pharmacopoeia of the United States (H.P.U.S.) to be used 
without the prior filing and approval of quantitative formulas. This 
procedure has been allowed because of the descriptive nature of these 
formulas and their consistency over the years. At present, however, the 
N.F. and U.S.P. are deleting their requirements for specific quantities 
of ingredients in some of their formulas, except for the active 
ingredients. Such non-descriptive formulas are not adequate for 
regulatory purposes, since alcohol is usually a vehicle rather than an 
active ingredient and is therefore not stated as a specific quantity 
within such formulas. Drawback of tax under 26 U.S.C. 5134 is claimed 
and allowed on exact amounts of alcohol used in the manufacture of 
nonbeverage products according to the quantity specified in the 
approved formula.
    Therefore, Sec. 17.132 in this final rule is worded so that ATF may 
require submission of quantitative formulas on ATF Form 5154.1 
(formerly 1678), Formula and Process for Nonbeverage Products, for 
preparations which appear in the N.F., U.S.P., or H.P.U.S. whenever it 
is determined that such submission is necessary to maintain control 
over alcohol used and to insure that the products meet the statutory 
requirements for drawback eligibility. It is expected that the list of 
preparations for which approval of quantitative formulas will be 
required under this regulation will be published as an ATF ruling in 
the ATF Bulletin.
    20. Drawback status of U.S.P., N.F., and H.P.U.S. preparations. 
Preparations listed in the U.S.P., N.F., and H.P.U.S. are generally 
exempt from the requirement to file quantitative formulas (former 
Sec. 197.96; Sec. 17.132 in this final rule), but this exemption does 
not necessarily entail approval for drawback. The statutory standard of 
``unfit for beverage purposes'' remains and must be enforced (26 U.S.C. 
5131(a)).
    Former regulations in part 197 were silent concerning the drawback 
status of U.S.P., N.F., and H.P.U.S. products. However, this issue 
should be addressed, so that manufacturers may properly plan. 
Therefore, Sec. 17.132 in this final rule states that formulas listed 
in the U.S.P., N.F. and H.P.U.S. are approved for drawback except as 
otherwise provided by regulation or ATF ruling. Alcohol, U.S.P. 
(including dehydrated alcohol and dehydrated alcohol injection), 
alcohol and dextrose injection, U.S.P., and tincture of ginger, 
H.P.U.S., are specifically declared in this regulation to be fit for 
beverage use.
    Similarly, H.P.U.S. preparations made at dilutions higher than 
``4X'' (i.e. one part in 10,000) are presumed to be fit for beverage 
use. Manufacturers of such products may contest this presumption by 
submitting appropriate evidence that a specific product is unfit for 
beverage use. The reason for the initial presumption is that the ATF 
Laboratory has determined that even for H.P.U.S. products containing 
certain poisonous materials, dilutions of greater than ``4X'' are fit 
for beverage use. ATF neither confirms nor disputes the medicinal value 
of such products, but the dilution one part of active ingredients in 
10,000 parts or more of alcohol and water has been found to result in a 
product that would be suitable for consumption as a beverage. 
Therefore, it has been ATF's position to deny drawback for H.P.U.S. 
products diluted to greater than ``4X.'' These final regulations 
reflect this position in Sec. 17.132(b).
    21. Liquor-filled candies. Paragraph (c) of Sec. 17.133 states 
ATF's longstanding policy that candies with alcoholic fillings may be 
regarded as nonbeverage products only if the fillings meet the 
requirements for alcoholic sauces, as stated in Sec. 17.133(a). Since 
some States may prohibit or restrict the manufacture or sale of liquor-
filled candies, a sentence in the introductory text of Sec. 17.133 
cautions applicants that formula approval does not authorize violation 
of State law.
    22. Use or sale of products for beverage purposes. The last 
sentence of Sec. 17.134 (adapted from former Secs. 170.615 and 170.618) 
makes it clear that drawback approval may be revoked if a product is 
found being used or sold for beverage purposes.
    23. Manufacturers who are also users of denatured alcohol. Since no 
tax is paid on denatured spirits, it would be conducive to fraud on the 
revenue for a single manufacturer to produce the same product out of 
both specially denatured alcohol and taxpaid alcohol

[[Page 31406]]

on which drawback may be claimed. Section 17.135(a) prohibits this 
practice.
    24. Claims for credit by manufacturers of nonbeverage products. 
Drawback manufacturers who also operate a distilled spirits plant may 
find it more convenient to claim nonbeverage drawback in the form of a 
credit to offset distilled spirits taxes owed by the distilled spirits 
plant. Therefore, Sec. 17.142(b) permits such a procedure.
    25. Changes in supporting data requirements. Under the regulations 
published in this document, the supporting data required to accompany 
claims has been simplified. The new supporting data is described by ATF 
Form 5154.2, which is authorized by these regulations. Use of this 
Government form is not mandatory; Sec. 17.147 permits the use of any 
alternative format that clearly shows all the required information.
    The new supporting data has eliminated material that is not 
necessary to the processing of drawback claims. Former Part II 
(``Distilled Spirits Received'') is gone. So is former Part V 
(``Intermediate Products Account'') except for the totals in column 
(i), which are incorporated into the Distilled Spirits Account. Part 
III has been shortened from 16 columns to 8, and is redesignated as 
``Production of Nonbeverage Products.'' Most of the simplification in 
Part III results from elimination of detailed information on use of 
specific finished products. Use of eligible spirits will be reported in 
three columns (``Kind,'' ``Drawback Rate,'' and ``Amount''), and use of 
ineligible spirits will not be reported, except for recovered spirits.
    Information no longer reported in the supporting data must still be 
recorded in the manufacturer's records, as prescribed in subpart H of 
part 17. The regional director (compliance) is authorized, under 
Secs. 17.147(a) and 17.123, to require additional supporting data if 
necessary in a particular case.
    Some new information has been added to the supporting data. 
Information about the place of origin of Puerto Rican and Virgin 
Islands spirits and other imported rum is required, because ATF needs 
this information in order to implement the Caribbean Basin Economic 
Recovery Act (Pub. L. 98-67, Title II). Separate reporting is required 
for spirits taxpaid at different effective tax rates through 
application of the wine and flavor tax credit of 26 U.S.C. 5010, 
because such spirits are subject to drawback at different rates. (The 
drawback rate is $1.00 less than the rate at which distilled spirits 
tax was paid, as provided in 26 U.S.C. 5134.)
    26. Public Law 98-369. This document reflects certain changes made 
by Public Law 98-369 (Deficit Reduction Act of 1984). Those changes 
are: (1) Addition of 26 U.S.C. 5206(d), relating to obliteration of 
marks, and (2) imposition of a $1,000 penalty for nonfraudulent 
violations of drawback law and regulations, unless the manufacturer 
establishes reasonable cause for a violation. Sections affected are: 
Secs. 17.148 and 17.184.
    With respect to the $1,000 penalty, the statute requires that the 
penalty be imposed ``for each failure to comply'' with law or 
regulations. This means that a separate penalty can be imposed for each 
product listed on a claim. For example, if several products were not 
manufactured according to formula, but were still unfit for beverage 
use, a $1,000 penalty could be imposed for each nonconforming product. 
If the amount claimed on any such product is less than $1,000, the 
penalty is limited to the amount claimed.
    Recordkeeping violations can also result in imposition of a penalty 
for each separate product. However, if the violations are so serious 
that they prevent the manufacturer from establishing either the 
unfitness of a product for beverage use or the quantity of the product 
that was made, then the penalty provision would not apply. Each claim 
must be considered on its own merits, and the burden of proving 
entitlement to drawback is always on the manufacturer. If this burden 
is not met with respect to any product, the claim for drawback relating 
to that product would be denied.
    The preceding comments also apply to products manufactured without 
submission of a formula. If the manufacturer can sustain the burden of 
proof, the claim would be approved subject to the penalty. However, 
without a formula, it is unlikely that this burden could be sustained 
other than by examination of batch records. ATF is not obliged to send 
an inspector to examine batch records when a manufacturer refuses to 
comply with the requirement to submit a formula.
    With respect to timely filing, a late-filed claim or formula counts 
as just one ``failure to comply.'' So if the only noncompliance is 
lateness in filing a claim, the maximum penalty would be $1,000. Late-
filed formulas result in a separate penalty for each late formula. 
Special tax paid subsequent to final action on a claim also results in 
a $1,000 penalty. It should be noted that in no case will a claim be 
paid more than 6 years after the quarter in which the products were 
manufactured, due to the statute of limitations of 28 U.S.C. 2401.
    Finally, the penalty provision does not apply in a case of fraud. 
Fraud is considered to be a deliberate violation with intent to 
deceive. If there is fraud, the entire claim will be denied, and the 
manufacturer may be subject to other civil and criminal penalties as 
well.
    27. Changes in recordkeeping requirements. Items deleted from the 
supporting data have been incorporated into the records required by 
subpart H of part 17 to be maintained at each nonbeverage premises. 
Certain formerly required records that are duplicative of the 
information provided by the supporting data have been deleted from 
subpart H. The holding of Industry Circular 79-5 with respect to 
records of raw materials and finished products has been clarified and 
incorporated in the regulations (see Secs. 17.164 and 17.165). An 
amendment to Sec. 19.780, specifying that the record required by that 
section must show the contents of each container, will facilitate the 
use of that record by nonbeverage manufacturers in complying with 
Sec. 17.162 in instances where a shipment consists of non-uniform 
containers.
    28. Gains in spirits received or on hand. This final rule requires 
gains in spirits received, as disclosed by the receiving gauge, and 
gains in spirits on hand, as disclosed by physical inventory, to be 
deducted from the claim covering the period in which the gain occurs. 
Deduction is appropriate in these circumstances, since a gain indicates 
either receipt of ineligible (untaxpaid) spirits or an excessive claim 
in a previous period. Regulations stating this requirement are in 
Secs. 17.147(d), 17.162(d), and 17.167(a).
    With respect to spirits received, Sec. 17.162(d) sometimes allows a 
gain to be avoided by recording the shipping plant's taxpayment gauge 
as the quantity received. For spirits received in a tank car or tank 
truck, this is only allowed when the drawback manufacturer's receiving 
gauge is within 0.2% of the taxpayment gauge. (This duplicates 
Sec. 197.130a(a) in former regulations.) If the taxpayment gauge was 
inaccurate within the 0.2% limitation, the discrepancy will tend to 
resolve itself as a gain or loss on the drawback manufacturer's next 
physical inventory.
    If the gauge of spirits received in a tank car or tank truck 
differs from the taxpayment gauge by more than 0.2%, the receiving 
gauge must be recorded in the manufacturer's records as the quantity 
received. This rule is based on the assumption that if the discrepancy 
is that great, the receiving gauge is more likely to be accurate. Under 
Sec. 17.162(d), any gain disclosed in such

[[Page 31407]]

circumstances must be immediately recorded as such and deducted from 
the manufacturer's next claim.
    29. Evidence of taxpayment. A new provision in Sec. 17.163 requires 
manufacturers to obtain commercial invoices or other documentation when 
spirits are purchased from wholesale and retail liquor dealers. This 
new requirement will help provide evidence of taxpayment of the 
spirits.
    In addition, Sec. 17.163 requires all manufacturers to obtain 
evidence of the effective tax rate paid on spirits other than alcohol, 
grain spirits, neutral spirits, distilled gin, and straight whisky. 
Spirits other than those kinds may contain wine and/or flavoring 
material that brings the effective tax rate below the normal distilled 
spirits rate ($13.50 per proof gallon). The effective tax rate is 
significant for nonbeverage drawback, because the drawback rate is $1 
less than the rate at which tax was paid or determined (26 U.S.C. 
5134(a)).
    For shipments received from a distilled spirits plant, an effective 
tax rate below $13.50 per proof gallon must be noted on the record of 
shipment required by Sec. 19.780 to be forwarded to the nonbeverage 
manufacturer. For spirits purchased from wholesale or retail liquor 
dealers, the drawback claimant must obtain the evidence of effective 
tax rate from the bottler, producer, or importer. If the required 
evidence is not obtained, drawback will only be allowed based on the 
lowest effective tax rate possible for the kind of distilled spirits 
product used.
    30. Production (batch) records. Under Sec. 17.164, the production 
records for nonbeverage and intermediate products generally must be 
kept by batch. To enable an ATF officer to compare the ingredients used 
in each batch with the ingredients listed in the product's formula, the 
records must refer to ingredients by the same names as are used for 
them in the product's formula. Synonymous names may additionally be 
shown. Alcohol usage may be shown by weight or by volume, and the proof 
of the spirits must also be shown.
    The alcohol content of nonbeverage products must be tested ``at 
representative intervals.'' This requirement is a variable, because the 
appropriate interval will vary to a great degree depending on the type 
of product and the frequency with which it is manufactured. The purpose 
of testing alcohol content is to verify the accuracy of the formula and 
to monitor compliance with it. If a manufacturer feels unsure of how 
frequently alcohol content should be tested to accomplish this purpose 
for a particular product, advice may be requested from ATF. Whenever 
the manufacturer does make a test, the results must be recorded in the 
production records.
    31. Specifications for physical inventories. These final 
regulations (Sec. 17.167) specify that the ``on hand'' figures in the 
supporting data must be verified by physical inventories ``as of the 
end of each quarter in which nonbeverage products were manufactured for 
purposes of drawback.'' The words ``as of'' indicate that the inventory 
need not be taken exactly at the end of the quarter; but if it is taken 
at a slightly different time, the data must be worked backward or 
forward to the end of the quarterly period. The regulations also 
authorize the regional director (compliance) to require physical 
inventories of nonbeverage products and raw ingredients whenever such 
inventories are deemed necessary to ensure compliance with regulations.
    32. Recovered alcohol. Recordkeeping requirements for recovered 
alcohol, formerly in Sec. 170.617(c), are incorporated in new 
Sec. 17.168. The regulations as proposed in Notice No. 748 did not 
provide for destruction of recovered alcohol, although permission for 
such destruction could be granted under Sec. 17.3, subject to such 
recordkeeping and other conditions as the approving official might have 
deemed appropriate. Since the need for destruction of recovered alcohol 
is an eventuality that can be expected to occur from time to time, this 
final rule provides a standard procedure to replace the need for an 
application under Sec. 17.3. Section 17.168 provides standard 
recordkeeping requirements and Sec. 17.183 requires a notification, 
which will give ATF the option of witnessing the destruction.
    33. Records retention. Section 17.170 (corresponding to former 
Sec. 197.133) extends the records retention period from 2 years to 3 
years, for consistency with other ATF regulations. This change will 
ensure the availability of records to support any action that may be 
taken within the period of the statute of limitations prescribed by 26 
U.S.C. 6531. This section of law prescribes a 3-year statute of 
limitations for most offenses; but for certain offenses involving fraud 
or willful violation, the statute of limitations is 6 years. Therefore, 
as in other ATF regulations, Sec. 17.170 contains a provision that 
permits the regional director (compliance) to require a longer records 
retention period, not to exceed an additional 3 years.
    34. Inspection of records. In addition to the records specifically 
required by regulations, ATF officers are authorized under 26 U.S.C. 
5133 (as delegates of the Secretary of the Treasury) to inspect any 
records ``bearing upon the matters required to be alleged'' in drawback 
claims. This authority is reiterated in Sec. 17.171.
    In carrying out this authority, ATF will continue to protect 
proprietary information. For example, the production records in 
Sec. 17.164 do not require greater detail as to ingredients than is 
shown on a product's formula. If some secret ingredients of a product 
are referred to in general terms, such as ``essential oils,'' on the 
formula, then the required production record for that product would 
only need to show the quantity of ``essential oils'' used in the 
production of each batch. The production record would not have to 
specify the secret ingredients. If unusual circumstances should require 
an ATF officer to examine other records, such as master formulas that 
do specify the secret ingredients, Sec. 17.171 does not provide 
authority for copies of such formulas to be made without the consent of 
the proprietor. (However, such copies could be required by the Director 
or a regional director (compliance) under Sec. 17.123.)
    The law, in 18 U.S.C. 1905 and 26 U.S.C. 7213, imposes criminal 
penalties on any ATF officer who makes unauthorized disclosure of 
confidential business information obtained in the course of his or her 
employment. Further restrictions on disclosure are found in 26 U.S.C. 
6103, which generally prohibits unauthorized disclosure of returns and 
return information. ``Returns'' and ``return information'' in that 
section include drawback claims and the records and reports which 
support them.
    35. Discontinuance of business. A requirement has been added, in 
Sec. 17.187, for notification to ATF when a manufacturer permanently 
discontinues business. This will enable ATF to manage its files, and it 
is reasonable in view of the conditional exemption from basic permit 
and special (occupational) tax requirements for the sale of alcohol 
remaining on hand.
    36. Nonbeverage products from Puerto Rico and the Virgin Islands. 
Amendments to 27 CFR 250.173 and 250.309 allow use of the new 
supporting data form (ATF F 5154.2) and specify that claims and bonds 
shall be filed with the Chief, Puerto Rico Operations, for nonbeverage 
products brought into the U.S. from Puerto Rico and the Virgin Islands. 
Although Notice No. 748 only proposed to amend the place for filing 
drawback claims, the place for filing bonds should be amended as well, 
since bonds and claims are filed at the same

[[Page 31408]]

place. Other changes in part 250 are miscellaneous technical and 
conforming changes.

                     Distribution Table for Part 197                    
------------------------------------------------------------------------
              Former section                         New section        
------------------------------------------------------------------------
                                Subpart A                               
                                                                        
Sec.  197.1...............................  Sec.  17.1.                 
Sec.  197.2...............................  Sec.  17.2.                 
Sec.  197.3...............................  Deleted.                    
                                                                        
                                Subpart B                               
                                                                        
Sec.  197.5: (generally)..................  Sec.  17.11.                
``Director of the Service Center''........  Deleted.                    
``District Director''.....................  Deleted.                    
``Time distilled spirits used''...........  Sec.  17.152(a).            
``Total annual withdrawals''..............  Deleted.                    
``Used''..................................  Sec.  17.151.               
``Year''..................................  Deleted.                    
                                                                        
                                Subpart C                               
                                                                        
Sec.  197.25..............................  Sec.  17.21 & Sec.  17.22.  
Sec.  197.25a.............................  Sec.  17.22.                
Sec.  197.26..............................  Sec.  17.23.                
Sec.  197.27..............................  Sec.  17.24.                
Sec.  197.28..............................  Sec.  17.31.                
Sec.  197.29..............................  Sec.  17.32.                
Sec.  197.29a(a)..........................  Sec.  17.41.                
Sec.  197.29a(b)..........................  Sec.  17.42.                
Sec.  197.29a(c)..........................  Sec.  17.43.                
Sec.  197.30 (except last sentence).......  Sec.  17.33.                
Sec.  197.30 (last sentence)..............  Covered by Sec.  17.6.      
Sec.  197.31..............................  Sec.  17.34.                
                                                                        
                                Subpart D                               
                                                                        
Sec.  197.40..............................  Sec.  17.51.                
Sec.  197.40a.............................  Sec.  17.52.                
Sec.  197.41..............................  Sec.  17.54.                
Sec.  197.42..............................  Sec.  17.53.                
Sec.  197.43..............................  Sec.  17.61.                
Sec.  197.46..............................  Sec.  17.62.                
Sec.  197.47..............................  Sec.  17.63.                
Sec.  197.47a.............................  Sec.  17.55.                
Sec.  197.48..............................  Sec.  17.71.                
Sec.  197.49..............................  Sec.  17.72.                
Sec.  197.50..............................  Sec.  17.73.                
Sec.  197.51..............................  Sec.  17.74.                
Sec.  197.52..............................  Sec.  17.81.                
Sec.  197.53..............................  Sec.  17.82.                
Sec.  197.54..............................  Sec.  17.83.                
Sec.  197.57..............................  Sec.  17.91.                
Sec.  197.58..............................  Sec.  17.92.                
Sec.  197.59..............................  Sec.  17.93.                
                                                                        
                                Subpart E                               
                                                                        
Sec.  197.65..............................  Sec.  17.101 (up to last    
                                             sentence).                 
Sec.  197.66..............................  Sec.  17.103.               
Sec.  197.67..............................  Secs.  17.105, 17.6.        
Sec.  197.68..............................  Sec.  17.104.               
Sec.  197.69..............................  Sec.  17.106.               
Sec.  197.70..............................  Sec.  17.144 (2nd sentence).
Sec.  197.71..............................  Sec.  17.101 (last          
                                             sentence).                 
Sec.  197.72..............................  Sec.  17.107.               
Sec.  197.73..............................  Sec.  17.108.               
Sec.  197.75..............................  Sec.  17.111.               
Sec.  197.76..............................  Sec.  17.112.               
Sec.  197.77 (except last sentence).......  Sec.  17.113.               
Sec.  197.77 (last sentence)..............  Covered by Sec.  17.108     
                                             (last sentence).           
Sec.  197.79..............................  Covered by Sec.  17.111.    
Sec.  197.80..............................  Sec.  17.114.               
                                                                        
                                Subpart F                               
                                                                        
Sec.  197.95 (sentences 1-2, 6, 8-9)......  Sec.  17.121.               
Sec.  197.95 (sentences 3 & 4)............  Sec.  17.131.               
Sec.  197.95 (5th sentence)...............  Sec.  17.137.               
Sec.  197.95 (7th sentence)...............  Sec.  17.122.               
Sec.  197.95 (last sentence)..............  Deleted.                    
Sec.  197.96..............................  Sec.  17.132(a).            
Sec.  197.97..............................  Sec.  17.123.               
Sec.  197.98..............................  Sec.  17.124.               
Sec.  197.99..............................  Sec.  17.125(a).            
                                                                        
                                Subpart G                               
                                                                        
Sec.  197.105.............................  
FR Doc. 96-14881 Taxpaid Distilled Spirits Used in Manufacturing Products Unfit for Beverage Use (73R-24P)
Sec.  17.141.               
Sec.  197.106 (up to proviso).............  Sec.  17.142(a).            
Sec.  197.106 (proviso, except next-to-     Sec.  17.143.               
 last sentence).                                                        
Sec.  197.106 (next-to-last sentence).....  Sec.  17.146(b).            
Sec.  197.107 (except first & last          Sec.  17.102.               
 sentences).                                                            
Sec.  197.107 (first & last sentences)....  Sec.  17.144 (first & last  
                                             sentences).                
Sec.  197.108.............................  Sec.  17.145.               
Sec.  197.109.............................  Sec.  17.146(a).            
Sec.  197.110.............................  Sec.  17.147.               
Sec.  197.111.............................  New supporting data form.   
Sec.  197.112-113.........................  Sec.  17.162(a).            
Sec.  197.114.............................  Sec.  17.162(b).            
Sec.  197.115.............................  Sec.  17.147 & new          
                                             supporting data form.      
Sec.  197.116 (except last sentence)......  New supporting data form.   
Sec.  197.116 (last sentence); also Sec.    Sec.  17.167(a).            
 197.117 (2nd sentence), Sec.  197.118                                  
 (2nd sentence), & Sec.  197.119 (2nd                                   
 sentence).                                                             
Sec.  197.117 (first sentence)............  New supporting data form.   
Sec.  197.117 (3rd & 4th sentences).......  Sec.  17.153(b).            
Sec.  197.117 (last sentence).............  Sec.  17.153(c).            
Sec.  197.118 (first sentence)............  New supporting data form.   
Sec.  197.118 (last sentence).............  Sec.  17.153(a).            
Sec.  197.119 (first sentence)............  Deleted; covered by new     
                                             supporting data form and   
                                             Sec.  17.164(b).           
Sec.  197.119 (last sentence).............  Sec.  17.155.               
                                                                        
                                Subpart H                               
                                                                        
Sec.  197.130 (introduction)..............  Sec.  17.161 (first         
                                             sentence).                 
Sec.  197.130(a)-(d)......................  Covered by Sec.  17.162(a)- 
                                             (c).                       
Sec.  197.130(e)-(g)......................  Sec.  17.164(b).            
Sec.  197.130(h)-(j)......................  Sec.  17.166(a).            
Sec.  197.130a(a).........................  Sec.  17.162(d).            
Sec.  197.130a(b).........................  Sec.  17.164(d).            
Sec.  197.130b............................  Sec.  17.163 (a) & (c).     
Sec.  197.131.............................  Sec.  17.166(c).            
Sec.  197.132 (except last clause)........  Sec.  17.161 (from 2nd      
                                             sentence to end).          
Sec.  197.132 (last clause)...............  Covered by Sec.  17.171.    
Sec.  197.133 (except last sentence)......  Sec.  17.170.               
Sec.  197.133 (last sentence).............  Sec.  17.171.               
------------------------------------------------------------------------

                      Derivation Table for Part 17                      
------------------------------------------------------------------------
                New section                            Source           
------------------------------------------------------------------------
                                Subpart A                               
                                                                        
Sec.  17.1................................  Sec.  197.1.                
Sec.  17.2................................  Sec.  197.2.                
Sec.  17.3................................  NEW.                        
Sec.  17.4................................  NEW.                        
Sec.  17.5................................  NEW.                        
Sec.  17.6................................  NEW (cf. Secs.  197.30 and  
                                             197.67(a)).                
                                                                        
                                Subpart B                               
                                                                        
Sec.  17.11: (generally)..................  Sec.  197.5.                
    ``Alcohol & Tobacco Laboratory''......  NEW.                        
    ``Approved''..........................  NEW.                        
    ``CFR''...............................  NEW.                        
    ``Eligible''..........................  NEW.                        
    ``Food products''.....................  Rev. Rul. 63-87.            
    ``Medicines''.........................  ATF Rul. 82-7.              
    ``Month''.............................  NEW.                        
    ``Person''............................  NEW.                        
    ``Proof gallon''......................  NEW.                        
    ``Quarter''...........................  NEW.                        
    ``Recovered spirits''.................  NEW.                        
    ``Subject to drawback''...............  NEW.                        
    ``Taxpaid''...........................  NEW.                        
    ``This chapter''......................  NEW.                        
                                                                        
                                Subpart C                               
                                                                        
Sec.  17.21...............................  Sec.  197.25.               
Sec.  17.22...............................  Sec.  197.25a.              
Sec.  17.23...............................  Sec.  197.26.               
Sec.  17.24...............................  Sec.  197.27.               
Sec.  17.31...............................  Sec.  197.28.               
Sec.  17.32...............................  Sec.  197.29.               
Sec.  17.33...............................  Sec.  197.30.               
Sec.  17.34...............................  Sec.  197.31.               
Sec.  17.41...............................  Sec.  197.29a(a).           
Sec.  17.42...............................  Sec.  197.29a(b).           
Sec.  17.43...............................  Sec.  197.29a(c).           
                                                                        
                                Subpart D                               
                                                                        
Sec.  17.51...............................  Sec.  197.40.               
Sec.  17.52...............................  Sec.  197.40a.              

[[Page 31409]]

                                                                        
Sec.  17.53...............................  Sec.  197.42.               
Sec.  17.54...............................  Sec.  197.41.               
Sec.  17.55...............................  Sec.  197.47a.              
Sec.  17.61...............................  Sec.  197.43.               
Sec.  17.62...............................  Sec.  197.46.               
Sec.  17.63...............................  Sec.  197.47.               
Sec.  17.71...............................  Sec.  197.48.               
Sec.  17.72...............................  Sec.  197.49.               
Sec.  17.73...............................  Sec.  197.50.               
Sec.  17.74...............................  Sec.  197.51.               
Sec.  17.75...............................  NEW.                        
Sec.  17.76...............................  ATF Rul. 74-2.              
Sec.  17.77...............................  NEW.                        
Sec.  17.81...............................  Sec.  197.52.               
Sec.  17.82...............................  Sec.  197.53.               
Sec.  17.83...............................  Sec.  197.54.               
Sec.  17.91...............................  Sec.  197.57.               
Sec.  17.92...............................  Sec.  197.58.               
Sec.  17.93...............................  Sec.  197.59.               
                                                                        
                                Subpart E                               
                                                                        
Sec.  17.101..............................  Secs.  197.65 & 197.71.     
Sec.  17.102..............................  Sec.  197.107 (except first 
                                             & last sentences).         
Sec.  17.103..............................  Sec.  197.66.               
Sec.  17.104..............................  Sec.  197.68.               
Sec.  17.105..............................  Sec.  197.67.               
Sec.  17.106..............................  Sec.  197.69.               
Sec.  17.107..............................  Sec.  197.72.               
Sec.  17.108..............................  Sec.  197.73.               
Sec.  17.111..............................  Secs.  197.75 & 197.79.     
Sec.  17.112..............................  Sec.  197.76.               
Sec.  17.113..............................  Sec.  197.77.               
Sec.  17.114..............................  Sec.  197.80.               
                                                                        
                                Subpart F                               
                                                                        
Sec.  17.121..............................  Sec.  197.95 (sentences 1-2,
                                             6, 8-9).                   
Sec.  17.122..............................  Sec.  197.95 (7th sentence) 
                                             & ATF Rul. 77-27.          
Sec.  17.123..............................  Sec.  197.97.               
Sec.  17.124..............................  Sec.  197.98.               
Sec.  17.125(a)...........................  Sec.  197.99.               
Sec.  17.125(b)...........................  NEW.                        
Sec.  17.126(a)...........................  NEW.                        
Sec.  17.126(b)...........................  Rev. Rul. 69-138.           
Sec.  17.127..............................  NEW.                        
Sec.  17.131..............................  Sec.  197.95 (3rd & 4th     
                                             sentences).                
Sec.  17.132(a)...........................  Sec.  197.96.               
Sec.  17.132(b)...........................  Sec.  170.616.              
Sec.  17.133..............................  Sec.  170.613(a) (7)-(9),   
                                             Rev. Rul. 63-87 & ATF Rul. 
                                             73-1.                      
Sec.  17.134..............................  NEW.                        
Sec.  17.135..............................  Rev. Ruls. 56-239 & 56-367. 
Sec.  17.136..............................  Rev. Rul. 58-350.           
Sec.  17.137..............................  Sec.  197.95 (5th sentence) 
                                             & Rev. Rul. 56-314.        
                                                                        
                                Subpart G                               
                                                                        
Sec.  17.141..............................  Sec.  197.105.              
Sec.  17.142(a)...........................  Sec.  197.106 (up to        
                                             proviso) & ATF Order       
                                             1100.95A.                  
Sec.  17.142(b)...........................  NEW.                        
Sec.  17.143..............................  Sec.  197.106 (proviso,     
                                             except next-to-last        
                                             sentence).                 
Sec.  17.144..............................  Secs.  197.70 & 197.107     
                                             (first & last sentence).   
Sec.  17.145..............................  Sec.  197.108.              
Sec.  17.146..............................  Secs.  197.106 (next-to-last
                                             sentence) & 197.109.       
Sec.  17.147(a)...........................  Sec.  197.110.              
Sec.  17.147(b)...........................  Sec.  197.115 (last         
                                             sentence).                 
Sec.  17.147 (c) & (d)....................  NEW.                        
Sec.  17.148..............................  NEW.                        
Sec.  17.151..............................  Sec.  197.11 (``Used'').    
Sec.  17.152(a)...........................  Sec.  197.11 (``Time        
                                             distilled spirits are      
                                             used'').                   
Sec.  17.152(b)...........................  ATF Rul. 76-17.             
Sec.  17.152(c)...........................  Rev. Ruls. 56-394 & 69-138. 
Sec.  17.152(d)...........................  Rev. Rul. 69-138.           
Sec.  17.153..............................  Secs.  197.117 (last three  
                                             sentences) & 197.118 (last 
                                             sentence).                 
Sec.  17.154..............................  Sec.  197.11 (``Intermediate
                                             products'').               
Sec.  17.155..............................  Sec.  197.119 (last         
                                             sentence).                 
                                                                        
                                Subpart H                               
                                                                        
Sec.  17.161..............................  Secs.  197.130              
                                             (introduction) & 197.132   
                                             (except last clause).      
Sec.  17.162(a)...........................  Secs.  197.112-113 & 197.130
                                             (a)-(d).                   
Sec.  17.162(b)...........................  Secs.  197.114 & 197.130 (a)-
                                             (d).                       
Sec.  17.162(c)...........................  NEW.                        
Sec.  17.162(d)...........................  Sec.  197.130a(a).          
Sec.  17.163 (a) & (c)....................  Sec.  197.130b.             
Sec.  17.163(b)...........................  NEW.                        
Sec.  17.164..............................  Secs.  197.130 (e)-(g) &    
                                             197.130a(b).               
Sec.  17.165..............................  Industry Circular 79-5.     
Sec.  17.166(a)...........................  Sec.  197.130 (h)-(j).      
Sec.  17.166(b)...........................  NEW.                        
Sec.  17.166(c)...........................  Sec.  197.131.              
Sec.  17.167(a)...........................  Secs.  197.116-119.         
Sec.  17.167(b)...........................  Industry Circular 79-5.     
Sec.  17.168..............................  Sec.  170.617(c).           
Sec.  17.169..............................  NEW.                        
Sec.  17.170..............................  Sec.  197.133 (except last  
                                             sentence).                 
Sec.  17.171..............................  Sec.  197.132 (last two     
                                             clauses), Sec.  197.133    
                                             (last sentence) & Industry 
                                             Circular 79-5.             
                                                                        
                                Subpart I                               
                                                                        
Sec.  17.181..............................  Rev. Rul. 56-335.           
Sec.  17.182..............................  Rev. Rul. 56-336.           
Sec.  17.183..............................  ATF Rul. 81-8 (modified).   
Sec.  17.184..............................  NEW.                        
Sec.  17.185 (a) & (c)....................  NEW.                        
Sec.  17.185(b)...........................  ATF Rul. 76-19.             
Sec.  17.186..............................  Rev. Rul. 56-395.           
Sec.  17.187..............................  Rev. Rul. 55-689.           
------------------------------------------------------------------------

Executive Order 12866

    It has been determined that this rule is not a significant 
regulatory action, because it will not: (1) Have an annual effect on 
the economy of $100 million or more or adversely affect in a material 
way the economy, a sector of the economy, productivity, competition, 
jobs, the environment, public health or safety, or State, local or 
tribal governments or communities; (2) Create a serious inconsistency 
or otherwise interfere with an action taken or planned by another 
agency; (3) Materially alter the budgetary impact of entitlements, 
grants, user fees, or loan programs or the rights and obligations of 
recipients thereof; or (4) Raise novel legal or policy issues arising 
out of legal mandates, the President's priorities, or the principles 
set forth in Executive Order 12866.

Paperwork Reduction Act

    The collections of information contained in this final regulation 
have been submitted to the Office of Management and Budget (OMB) in 
accordance with the Paperwork Reduction Act of 1980 (44 U.S.C. 3504(h)) 
and approved under control numbers 1512-0078, 1512-0079, 1512-0095, 
1512-0141, 1512-0188, 1512-0378, 1512-0379, 1512-0472, 1512-0492, 1512-
0500, and 1512-0514. The likely respondents and recordkeepers are 
businesses or other for-profit institutions, including small businesses 
or organizations.
    The collection of information under control number 1512-0078 is in 
Sec. 17.106. This information is required by ATF to obtain the surety's 
agreement to any changes in the terms of bonds. The collections of 
information under control number 1512-0079 are in Secs. 17.6 and 
17.105. This information is required when agents obtain authority to 
sign official documents on behalf of the principal.
    The collections of information under control number 1512-0095 are 
in Secs. 17.121, 17.126, 17.127, 17.132, and 17.136. This information 
is required by ATF to describe the formulas for nonbeverage and 
intermediate products. The information is used to ensure that drawback 
products meet the statutory requirements for approval as being 
medicines, medicinal preparations, food

[[Page 31410]]

products, flavors, flavoring extracts, or perfume that are unfit for 
beverage use.
    The collections of information under control number 1512-0141 are 
in Secs. 17.92, 17.93, 17.142, 17.145, and 17.146. The information on 
this claim form must be submitted to ATF by manufacturers claiming 
nonbeverage drawback or refund of special (occupational) tax. The 
information is used to determine whether the claim is valid.
    The collection of information under control number 1512-0188 is in 
Sec. 17.6. The information on this form provides ATF with notification 
of corporate officials authorized to sign documents on behalf of the 
corporation.
    The collections of information under control number 1512-0378 are 
in Secs. 17.3, 17.54, 17.111, 17.112, 17.122-17.125, 17.143, 17.168(a), 
17.183, and 17.187. This control number covers miscellaneous 
information required by ATF on an irregular basis to ensure compliance 
with law and regulations or to grant permission for the use of optional 
procedures.
    The collections of information under control number 1512-0379 are 
in Secs. 17.161-17.167, 17.168(b), 17.169, 17.170, 17.182, and 17.186. 
This information is required to support claims for drawback. The 
records kept by manufacturers at their plants are used by ATF 
inspectors conducting on-site inspections.
    The collections of information under control number 1512-0472 are 
in Secs. 17.31-17.34, 17.41, 17.53, 17.61, 17.63, 17.71, and 17.74. The 
information on this special tax return is required when paying special 
(occupational) tax. The collections of information under control number 
1512-0492 are in Secs. 17.42, 17.43, 17.52, and 17.55. This control 
number pertains to records associated with the preparation and filing 
of the special tax return. The collections of information under control 
number 1512-0500 are in Secs. 17.31-17.34, 17.41, and 17.53. This 
requirement is the same special tax return covered by control number 
1512-0472, except that the form is modified (simplified) for use by 
renewal taxpayers.
    The collection of information under control number 1512-0514 is in 
Secs. 17.147 and 17.182. This collection of information consists of 
supporting data required to accompany claims for drawback. The 
supporting data submitted to ATF is used to make a preliminary 
verification of claims before they are paid.
    The estimated total number of respondents and recordkeepers 
affected by these collections of information is 611. The estimated 
average annual burden is approximately 36 hours per respondent or 
recordkeeper. (This figure represents the additional time that would be 
required, beyond what a manufacturer would customarily spend on 
recordkeeping in the ordinary course of his business.) Comments on 
these collections of information, including comments relating to the 
accuracy of the burden estimate and suggestions for reducing this 
burden, were requested by Notices No. 634 and 748. Public comments 
pertaining to the collections of information prescribed by this final 
rule are discussed above, under the headings ``Public Comments on 
Notice No. 634'' and ``Public Comments on Notice No. 748.'' An agency 
may not conduct or sponsor, and a person is not required to respond to, 
a collection of information unless it displays a valid control number 
assigned by OMB.

Regulatory Flexibility Act

    The provisions of the Regulatory Flexibility Act relating to a 
final regulatory flexibility analysis (5 U.S.C. 603, 604) are 
applicable to this final rule. A final regulatory flexibility analysis 
has been prepared and reads as follows:

I. Rationale for Agency Action

    The law (26 U.S.C. 5131-5134) authorizes a drawback of internal 
revenue tax on alcohol used in the manufacture of certain nonbeverage 
products. This drawback shall be granted by the Department of the 
Treasury on receipt of a proper claim. To determine whether a claim is 
proper, regulations may require certain records to be kept and reports 
to be submitted by those claiming drawback, in order to establish their 
eligibility. That is, it must be shown that the alcohol on which 
drawback is claimed: (A) Was actually used, (B) was used in the 
manufacture of the particular products for which drawback is 
authorized, and (C) was originally taxpaid.
    The regulations dealing with nonbeverage drawback are therefore 
issued under this primary rationale: to protect the revenue. However, 
this rationale is modified by a secondary rationale, which is: to 
require only those items of information to be submitted or to be 
recorded which are actually necessary to establish eligibility for 
drawback. With respect to those items required to be submitted to the 
Bureau of Alcohol, Tobacco and Firearms (ATF), only those should be 
submitted which are actually used to maintain control over the approval 
of claims. With respect to those records required to be maintained at 
the claimant's premises, the claimant's own record system should be 
utilized at all possible times to avoid duplication.

II. Objective and Legal Basis for the Rule

    A. Objective basis. The objective basis of these regulations is 
that a dual control system is used to verify the propriety of claims: 
Initially, a sampling procedure in the regional office is used to 
screen the claims before they are paid; subsequently, periodic field 
inspections at the manufacturing premises provide the opportunity to 
audit more detailed records.
    At the regional offices, not every item on every report is checked 
every time; however, a sufficient number are checked in order to insure 
that there is no likelihood of fraud. Those reports which are checked 
must contain sufficient information to reveal undisguised fraud and/or 
honest mistakes. The information submitted should also permit detection 
of any problems which would result in scheduling an on-site inspection 
sooner than would otherwise be planned.
    During on-site inspections, ATF officers examine original batch 
records to verify compliance with approved formulas. A physical 
inventory is taken and records are examined to see whether they agree 
with the inventory. If necessary, a claim adjustment may be required.
    B. Legal basis. The legal basis of these regulations is found in 26 
U.S.C. 5131-5134 and 7805. These laws give the Secretary of the 
Treasury broad discretion to promulgate regulations, but the 
regulations must be limited to the function of revenue protection. 
Treasury Department Order No. 120-01 (dated June 6, 1972, effective 
July 1, 1972) delegated to the Bureau of Alcohol, Tobacco and Firearms 
the function of prescribing and administering such regulations.
    C. Estimate of number of small entities affected and types. It is 
estimated that this document will affect about 611 small entities which 
use taxpaid alcohol to manufacture nonbeverage products.

III. Detailed Estimate and Description of the Reporting, 
Recordkeeping and Compliance Requirements

    A. Reporting requirements. The most significant reporting 
requirements of this document pertain to the supporting data that is 
required to accompany each claim. The supporting data must include 
information regarding: the amount of taxpaid alcohol received, the 
amount of each product produced, the amount of taxpaid alcohol used and 
the

[[Page 31411]]

product in which used, the amount of alcohol recovered (if any), the 
amount of tax claimed as drawback, the amount of alcohol on hand at the 
beginning and end of each claim period, and an explanation of any 
discrepancies disclosed by physical inventory. Other reports which are 
required less frequently include: Statements of formula and process 
(which are necessary to establish that the products being manufactured 
are of the types for which drawback is authorized under law), bonds and 
consents of surety in the case of claimants filing monthly claims, 
samples of the product if needed to determine its nonbeverage 
character, a special tax return and registration (as required by law in 
26 U.S.C. 5131-5132), an application for an employer identification 
number in order to identify the special taxpayer, and information 
relating to any changes in the location or control of the business. If 
no drawback is claimed, then none of the requirements need be complied 
with. The reporting requirements affect all classes of nonbeverage 
drawback manufacturers. Some knowledge of chemistry is helpful in 
preparing the required formulas for submission, and an elementary 
knowledge of bookkeeping is needed to maintain the required accounts 
for submission.
    B. Recordkeeping requirements. The recordkeeping requirements of 
this regulation are designed to be supplementary to the reporting 
requirements. The records support and amplify the statements given in 
the required reports. Ultimately, the purpose is to facilitate 
verification of the amount of drawback claimed. No particular form of 
record is required; rather, the records may be kept in any format, so 
long as the information is clearly expressed. For the most part, these 
required records are merely ordinary business records which the 
manufacturer would normally maintain in the course of his business. 
However, it is still necessary for regulations to specify that these 
records must be kept; otherwise, a claimant under investigation might 
falsely deny keeping the records, and if there were no requirement that 
the records be kept, then it would be difficult to prove any violation 
against such a person. The records which this regulation requires 
claimants to keep are: Copies of the reports submitted, records of 
disposition of nonbeverage products, records of raw materials received, 
accounting for recovered alcohol, invoices of purchases, evidence of 
taxpayment, and batch records of ingredients used in each production 
batch. The regional director (compliance) may also require a 
manufacturer to keep inventory records of raw materials and nonbeverage 
products. All classes of nonbeverage drawback manufacturers are 
affected by these recordkeeping requirements. An elementary knowledge 
of bookkeeping is needed to prepare and record the prescribed accounts.
    C. Compliance requirements. The compliance requirements of this 
regulation are: To retain the special tax stamp at the place of 
business as evidence of payment of special tax; to observe the 
statutory time restrictions for filing of claims (six months following 
the close of the quarter within which the alcohol was used); to retain 
the required records for a period of at least 3 years; to obliterate 
taxpayment marks on emptied containers of distilled spirits (as 
required by 26 U.S.C. 5206); to use intermediate products, and alcohol 
recovered from nonbeverage products, for no purpose other than to 
manufacture nonbeverage products; to transfer intermediate products to 
no one except another branch or plant of the same manufacturer; to 
refrain from transferring unfinished nonbeverage products to any other 
premises; and to refrain from selling or transferring any recovered 
alcohol or material from which alcohol can be recovered, except as 
provided by regulation. All classes of nonbeverage drawback 
manufacturers are affected by these requirements. No special skills are 
needed for compliance.

IV. Conflicting, Duplicative or Overlapping Federal Rules

    Some of the requirements of these regulations may overlap 
requirements of the Internal Revenue Service (IRS). The reason for this 
is that the IRS requires certain financial and cost accounting records 
in order to establish income tax liability, and in some cases the same 
information may be required by this part in order to establish 
eligibility for drawback of excise tax. In case of such overlap, the 
proprietor would not be required to keep two separate sets of records; 
the same set of records could suffice to meet the requirements of both 
ATF and IRS regulations. There is no additional burden, because these 
records are merely those which anyone would keep in the ordinary course 
of business. The Food and Drug Administration (FDA) may also require 
certain records which duplicate or overlap the records required by 
these regulations. Such FDA records will also satisfy the ATF 
requirement, due to the fact that these regulations do not specify any 
particular format for the records, so long as the information is 
clearly presented and available to ATF inspectors.

V. Alternatives

    A. Multitiering. This concept is not used, because the large 
majority of manufacturers of nonbeverage products are small entities. 
Consequently, the regulatory requirements have been specifically 
designed in consideration of the needs of small establishments. Larger 
establishments should also be able to comply with these requirements 
without particular difficulties.
    B. Simplification of requirements. The requirements as they are 
established are felt to be at the minimum. These requirements are 
necessary in order to protect the revenue and detect fraud against the 
Treasury. In most cases, of course, no fraud exists. But the 
requirements must be imposed equally on all claimants, so that if and 
when fraud exists, it will be detected. This is the statutory mandate 
of 26 U.S.C. 5132.
    C. Performance standards. This concept was utilized as much as 
possible. For example, an ATF form for ``supporting data'' reports is 
provided--but the format presented on that form is not required. (Any 
desired format may be used if it provides the necessary information.) 
Similarly, the required records also may be kept in any convenient 
format. However, the needs of the Government, with respect to 
expeditious processing of claims and tax payments, mandate prescription 
of specific forms for submission of drawback claims and payment of 
special tax. A specific form is also prescribed for formula submission, 
in order to facilitate communication concerning the formula among the 
applicable ATF offices as well as between ATF and the claimant. A 
special regulations section authorizes variation from most requirements 
if good cause can be shown for a variation.
    D. Exemption of small entities. The law does not authorize 
exemption of any entity from the requirements.

VI. Issues Raised by Comments

    No comments directed to the issues addressed in the Initial 
Regulatory Flexibility Analyses of Notices No. 634 and 748 have been 
received from the public or the Chief Counsel for Advocacy of the Small 
Business Administration.

Drafting Information

    The principal drafter of this document was Steven C. Simon of the 
Wine, Beer, and Spirits Regulations Branch, Bureau of Alcohol, Tobacco 
and Firearms.

[[Page 31412]]

List of Subjects

27 CFR Parts 17 and 197

    Alcohol and alcoholic beverages, Authority delegations (Government 
agencies), Claims, Drugs, Excise taxes, Foods, Reporting and 
recordkeeping requirements, Spices and flavorings, Surety bonds.

27 CFR Part 19

    Administrative practice and procedure, Alcohol and alcoholic 
beverages, Authority delegations (Government agencies), Chemicals, 
Claims, Customs duties and inspection, Electronic fund transfers, 
Excise taxes, Exports, Gasohol, Imports, Labeling, Liquors, Packaging 
and containers, Puerto Rico, Reporting and recordkeeping requirements, 
Research, Security measures, Spices and flavorings, Stills, Surety 
bonds, Transportation, Vinegar, Virgin Islands, Warehouses, Wine.

27 CFR Part 70

    Administrative practice and procedure, Alcohol and alcoholic 
beverages, Authority delegations (Government agencies), Claims, Excise 
taxes, Firearms and ammunition, Government employees, Law enforcement, 
Law enforcement officers, Penalties, Seizures and forfeitures, Surety 
bonds, Tobacco.

27 CFR Part 170

    Alcohol and alcoholic beverages, Authority delegations (Government 
agencies), Claims, Customs duties and inspection, Disaster assistance, 
Excise taxes, Labeling, Liquors, Penalties, Reporting and recordkeeping 
requirements, Surety bonds, Wine.

27 CFR Part 194

    Alcohol and alcoholic beverages, Authority delegations (Government 
agencies), Beer, Claims, Excise taxes, Exports, Labeling, Liquors, 
Packaging and containers, Penalties, Reporting and recordkeeping 
requirements, Wine.

27 CFR Part 250

    Administrative practice and procedure, Alcohol and alcoholic 
beverages, Authority delegations (Government agencies), Beer, Claims, 
Customs duties and inspection, Drugs, Electronic funds transfers, 
Excise taxes, Foods, Liquors, Packaging and containers, Puerto Rico, 
Reporting and recordkeeping requirements, Spices and flavorings, Surety 
bonds, Transportation, Virgin Islands, Warehouses, Wine.

Issuance

    Accordingly, title 27 of the Code of Federal Regulations is amended 
as follows:
    Paragraph A. Title 27 CFR part 17 is added to read as follows:

PART 17--DRAWBACK ON TAXPAID DISTILLED SPIRITS USED IN 
MANUFACTURING NONBEVERAGE PRODUCTS

Subpart A--General Provisions

Sec.
17.1  Scope of regulations.
17.2  Forms prescribed.
17.3  Alternate methods or procedures.
17.4  OMB control numbers assigned under the Paperwork Reduction 
Act.
17.5  Products manufactured in Puerto Rico or the Virgin Islands.
17.6  Signature authority.

Subpart B--Definitions

17.11  Meaning of terms.

Subpart C--Special Tax

17.21  Payment of special tax.
17.22  Rate of special tax
17.23  Special tax for each place of business.
17.24  Time for payment of special tax.

Special Tax Returns

17.31  Filing of return and payment of special tax.
17.32  Completion of ATF Form 5630.5.
17.33  Signature on returns, ATF Form 5630.5.
17.34  Verification of returns.

Employer Identification Number

17.41  Requirement for employer identification number.
17.42  Application for employer identification number.
17.43  Preparation and filing of Form SS-4.

Subpart D--Special Tax Stamps

17.51  Issuance of stamps.
17.52  Distribution of stamps for multiple locations.
17.53  Correction of errors on stamps.
17.54  Lost or destroyed stamps.
17.55  Retention of special tax stamps.

Change in Location

17.61  General.
17.62  Failure to register.
17.63  Certificates in lieu of lost stamps.

Change in Control

17.71  General.
17.72  Right of succession.
17.73  Failure to register.
17.74  Certificates in lieu of lost stamps.
17.75  Formation of partnership or corporation.
17.76  Addition or withdrawal of partners.
17.77  Reincorporation.

Change in Name or Style

17.81  General.
17.82  Change in capital stock.
17.83  Sale of stock.

Refund of Special Tax

17.91  Absence of liability, refund of special tax.
17.92  Filing of refund claim.
17.93  Time limit for filing refund claim.

Subpart E--Bonds and Consents of Sureties

17.101  General.
17.102  Amount of bond.
17.103  Bonds obtained from surety companies.
17.104  Deposit of collateral.
17.105  Filing of powers of attorney.
17.106  Consents of surety.
17.107  Strengthening bonds.
17.108  Superseding bonds.

Termination of Bonds

17.111  General.
17.112  Notice by surety of termination of bond.
17.113  Extent of release of surety from liability under bond.
17.114  Release of collateral.

Subpart F--Formulas and Samples

17.121  Product formulas.
17.122  Amended or revised formulas.
17.123  Statement of process.
17.124  Samples.
17.125  Adoption of formulas and processes.
17.126  Formulas for intermediate products.
17.127  Self-manufactured ingredients treated optionally as 
unfinished nonbeverage products.

Approval of Formulas

17.131  Formulas on ATF Form 5154.1.
17.132  U.S.P., N.F., and H.P.U.S. preparations.
17.133  Food product formulas.
17.134  Determination of unfitness for beverage purposes.
17.135  Use of specially denatured alcohol (S.D.A.).
17.136  Compliance with Food and Drug Administration requirements.
17.137  Formulas disapproved for drawback.

Subpart G--Claims for Drawback

17.141  Drawback.
17.142  Claims.
17.143  Notice for monthly claims.
17.144  Bond for monthly claims.
17.145  Date of filing claim.
17.146  Information to be shown by the claim.
17.147  Supporting data.
17.148  Allowance of claims.

Spirits Subject to Drawback

17.151  Use of distilled spirits.
17.152  Time of use of spirits.
17.153  Recovered spirits.
17.154  Spirits contained in intermediate products.
17.155  Spirits consumed in manufacturing intermediate products.

Subpart H--Records

17.161  General.
17.162  Receipt of distilled spirits.
17.163  Evidence of taxpayment of distilled spirits.
17.164  Production record.
17.165  Receipt of raw ingredients.

[[Page 31413]]

17.166  Disposition of nonbeverage products.
17.167  Inventories.
17.168  Recovered spirits.
17.169  Transfer of intermediate products.
17.170  Retention of records.
17.171  Inspection of records.

Subpart I--Miscellaneous Provisions

17.181  Exportation of medicinal preparations and flavoring 
extracts.
17.182  Drawback claims by druggists.
17.183  Disposition of recovered alcohol and material from which 
alcohol can be recovered.
17.184  Distilled spirits container marks.
17.185  Requirements for intermediate products and unfinished 
nonbeverage products.
17.186  Transfer of distilled spirits to other containers.
17.187  Discontinuance of business.

    Authority: 26 U.S.C. 5010, 5131-5134, 5143, 5146, 5206, 5273, 
6011, 6065, 6091, 6109, 6151, 6402, 6511, 7011, 7213, 7652, 7805; 31 
U.S.C. 9301, 9303, 9304, 9306.

Subpart A--General Provisions

Sec. 17.1  Scope of regulations.

    The regulations in this part apply to the manufacture of medicines, 
medicinal preparations, food products, flavors, flavoring extracts, and 
perfume that are unfit for beverage use and are made with taxpaid 
distilled spirits. The regulations cover the following topics: 
obtaining drawback of internal revenue tax on distilled spirits used in 
the manufacture of nonbeverage products; the payment of special 
(occupational) taxes in order to be eligible to receive drawback; and 
bonds, claims, formulas and samples, losses, and records to be kept 
pertaining to the manufacture of nonbeverage products.

Sec. 17.2  Forms prescribed.

    (a) The Director is authorized to prescribe all forms, including 
bonds and records, required by this part. All of the information called 
for in each form shall be furnished as indicated by the headings on the 
form and the instructions on or pertaining to the form. In addition, 
information called for in each form shall be furnished as required by 
this part.
    (b) Requests for forms should be mailed to the ATF Distribution 
Center, PO Box 5950, Springfield, Virginia 22150-5950.

Sec. 17.3  Alternate methods or procedures.

    (a) General. The Director may approve the use of an alternate 
method or procedure in lieu of a method or procedure prescribed in this 
part if he or she finds that--
    (1) Good cause has been shown for the use of the alternate method 
or procedure;
    (2) The alternate method or procedure is within the purpose of, and 
consistent with the effect intended by, the method or procedure 
prescribed by this part, and affords equivalent security to the 
revenue; and
    (3) The alternate method or procedure will not be contrary to any 
provision of law, and will not result in any increase in cost to the 
Government or hinder the effective administration of this part.
    (b) Application. A letter of application to employ an alternate 
method or procedure shall be submitted to the regional director 
(compliance) for transmittal to the Director. The application shall 
specifically describe the proposed alternate method or procedure, and 
shall set forth the reasons therefor.
    (c) Approval. No alternate method or procedure shall be employed 
until the application has been approved by the Director. The Director 
shall not approve any alternate method relating to the giving of any 
bond or to the assessment, payment, or collection of any tax. The 
manufacturer shall, during the period of authorization, comply with the 
terms of the approved application and with any conditions thereto 
stated by the Director in the approval. Authorization for any alternate 
method or procedure may be withdrawn by written notice from the 
Director whenever in his or her judgment the revenue is jeopardized, 
the effective administration of this part is hindered, or good cause 
for the authorization no longer exists. The manufacturer shall retain, 
in the records required by Sec. 17.170, any authorization given by the 
Director under this section.

Sec. 17.4  OMB control numbers assigned under the Paperwork Reduction 
Act.

    (a) Purpose. This section collects and displays the control numbers 
assigned to the information collection requirements of this part by the 
Office of Management and Budget under the Paperwork Reduction Act of 
1980, Public Law 96-511.
    (b) OMB control number 1512-0078. OMB control number 1512-0078 is 
assigned to the following section in this part: Sec. 17.106.
    (c) OMB control number 1512-0079. OMB control number 1512-0079 is 
assigned to the following sections in this part: Secs. 17.6 and 17.105.
    (d) OMB control number 1512-0095. OMB control number 1512-0095 is 
assigned to the following sections in this part: Secs. 17.121, 17.126, 
17.127, 17.132, and 17.136.
    (e) OMB control number 1512-0141. OMB control number 1512-0141 is 
assigned to the following sections in this part: Secs. 17.92, 17.93, 
17.142, 17.145, and 17.146.
    (f) OMB control number 1512-0188. OMB control number 1512-0188 is 
assigned to the following section in this part: Sec. 17.6.
    (g) OMB control number 1512-0378. OMB control number 1512-0378 is 
assigned to the following sections in this part: Secs. 17.3, 17.54, 
17.111, 17.112, 17.122, 17.123, 17.124, 17.125, 17.143, 17.168(a), 
17.183, and 17.187.
    (h) OMB control number 1512-0379. OMB control number 1512-0379 is 
assigned to the following sections in this part: Secs. 17.161, 17.162, 
17.163, 17.164, 17.165, 17.166, 17.167, 17.168(b), 17.169, 17.170, 
17.182, and 17.186.
    (i) OMB control number 1512-0472. OMB control number 1512-0472 is 
assigned to the following sections in this part: Secs. 17.31, 17.32, 
17.33, 17.34, 17.41, 17.53, 17.61, 17.63, 17.71, and 17.74.
    (j) OMB control number 1512-0492. OMB control number 1512-0492 is 
assigned to the following sections in this part: Secs. 17.42, 17.43, 
17.52, and 17.55.
    (k) OMB control number 1512-0500. OMB control number 1512-0500 is 
assigned to the following sections in this part: Secs. 17.31, 17.32, 
17.33, 17.34, 17.41, and 17.53.
    (l) OMB control number 1512-0514. OMB control number 1512-0514 is 
assigned to the following sections in this part: Secs. 17.147 and 
17.182.

Sec. 17.5  Products manufactured in Puerto Rico or the Virgin Islands.

    For additional provisions regarding drawback on distilled spirits 
contained in medicines, medicinal preparations, food products, flavors, 
flavoring extracts, or perfume which are unfit for beverage purposes 
and which are brought into the United States from Puerto Rico or the 
U.S. Virgin Islands, see part 250, subparts I and Ob, of this chapter.

Sec. 17.6  Signature authority.

    No claim, bond, tax return, or other required document executed by 
a person as an agent or representative is acceptable unless a power of 
attorney or other proper notification of signature authority has been 
filed with the ATF office where the required document must be filed. 
The ATF officer with whom the claim or other required document is filed 
may, when he or she considers it necessary, require additional evidence 
of the authority of the agent or representative to execute the 
document. Except as otherwise provided by this part, powers of

[[Page 31414]]

attorney shall be filed on ATF Form 1534 (5000.8), Power of Attorney. 
Notification of signature authority of partners, officers, or employees 
may be given by filing a copy of corporate or partnership documents, 
minutes of a meeting of the board of directors, etc. For corporate 
officers or employees, ATF Form 5100.1, Signing Authority for Corporate 
Officials, may be used. For additional provisions regarding powers of 
attorney, see Sec. 17.105 and 26 CFR part 601, subpart E.

Subpart B--Definitions

Sec. 17.11  Meaning of terms.

    As used in this part, unless the context otherwise requires, terms 
have the meanings given in this section. Words in the plural form 
include the singular, and vice versa, and words indicating the 
masculine gender include the feminine. The terms ``includes'' and 
``including'' do not exclude things not listed which are in the same 
general class.
    Alcohol and Tobacco Laboratory. The Alcohol and Tobacco Laboratory, 
Bureau of Alcohol, Tobacco and Firearms, 1401 Research Boulevard, 
Rockville, Maryland 20850.
    Approved, or approved for drawback. When used with reference to 
products and their formulas, this term means that drawback may be 
claimed on eligible spirits used in such products in accordance with 
this part.
    ATF officer. An officer or employee of the Bureau of Alcohol, 
Tobacco and Firearms (ATF) authorized to perform any function relating 
to the administration or enforcement of this part.
    CFR. The Code of Federal Regulations.
    Director. The Director, Bureau of Alcohol, Tobacco and Firearms, 
the Department of the Treasury, Washington, DC 20226; or his or her 
delegate.
    Distilled spirits, or spirits. That substance known as ethyl 
alcohol, ethanol, spirits, or spirits of wine in any form (including 
all dilutions and mixtures thereof, from whatever source or by whatever 
process produced).
    Effective tax rate. The net tax rate, after reduction for any 
credit allowable under 26 U.S.C. 5010 for wine and flavor content, at 
which the tax imposed on distilled spirits by 26 U.S.C. 5001 or 7652 is 
paid or determined. For distilled spirits with no wine or flavors 
content, the effective tax rate equals the rate of tax imposed by 26 
U.S.C. 5001 or 7652.
    Eligible, or eligible for drawback. When used with reference to 
spirits, this term designates taxpaid spirits which have not yet been 
used in nonbeverage products.
    Filed. Subject to the provisions of Secs. 70.305 and 70.306 of this 
chapter, a claim for drawback or other document or payment submitted 
under this part is generally considered to have been ``filed'' when it 
is received by the office of the proper Government official; but if an 
item is mailed timely with postage prepaid, then the United States 
postmark date is treated as the date of filing.
    Food products. Includes food adjuncts, such as preservatives, 
emulsifying agents, and food colorings, which are manufactured and 
used, or sold for use, in food.
    Intermediate products. Products to which all three of the following 
conditions apply: they are made with taxpaid distilled spirits, they 
have been disapproved for drawback, and they are made by the 
manufacturer exclusively for its own use in the manufacture of 
nonbeverage products approved for drawback. However, ingredients 
treated as unfinished nonbeverage products under Sec. 17.127 are not 
considered to be intermediate products.
    Medicines. Includes laboratory stains and reagents for use in 
medical diagnostic procedures.
    Month. A calendar month.
    Nonbeverage products. Medicines, medicinal preparations, food 
products, flavors, flavoring extracts, or perfume, which are 
manufactured using taxpaid distilled spirits, and which are unfit for 
use for beverage purposes.
    Person. An individual, trust, estate, partnership, association, 
company, or corporation.
    Proof gallon. A gallon of liquid at 60 degrees Fahrenheit, which 
contains 50 percent by volume of ethyl alcohol having a specific 
gravity of 0.7939 at 60 degrees Fahrenheit (referred to water at 60 
degrees Fahrenheit as unity), or the alcoholic equivalent thereof.
    Quarter. A 3-month period beginning January 1, April 1, July 1, or 
October 1.
    Recovered spirits. Taxpaid spirits that have been salvaged, after 
use in the manufacture of a product or ingredient, so that the spirits 
are reusable.
    Regional director (compliance). The principal ATF regional official 
responsible for administering regulations in this part, or his or her 
delegate.
    Special tax. The special (occupational) tax on manufacturers of 
nonbeverage products, imposed by 26 U.S.C. 5131.
    Subject to drawback. This term is used with reference to spirits. 
Eligible spirits become ``subject to drawback'' when they are used in 
the manufacture of a nonbeverage product. When spirits have become 
``subject to drawback,'' they may be included in the manufacturer's 
claim for drawback of tax covering the period in which they were first 
used.
    Tax year. The period from July l of one calendar year through June 
30 of the following year.
    Taxpaid. When used with respect to distilled spirits, this term 
shall mean that all taxes imposed on such spirits by 26 U.S.C. 5001 or 
7652 have been determined or paid as provided by law.
    This chapter. Chapter I of title 27 of the Code of Federal 
Regulations.
    U.S.C. The United States Code.

Subpart C--Special Tax

Sec. 17.2l  Payment of special tax.

    Each person who uses taxpaid distilled spirits in the manufacture 
or production of nonbeverage products shall pay special tax as 
specified in Sec. 17.22 in order to be eligible to receive drawback on 
the spirits so used. Special tax shall be paid for each tax year during 
which spirits were used in the manufacture of a product covered by a 
drawback claim. If a claim is filed covering taxpaid distilled spirits 
used during the preceding tax year, and special tax has not been paid 
for the preceding tax year, then special tax for the preceding tax year 
shall be paid. Regardless of the portion of a tax year covered by a 
claim, the full annual special tax shall be paid. The manufacturer is 
not required to pay the special tax if drawback is not claimed.

Sec. 17.22  Rate of special tax.

    Effective January 1, 1988, the rate of special tax is $500 per tax 
year for all persons claiming drawback on distilled spirits used in the 
manufacture or production of nonbeverage products.

Sec. 17.23  Special tax for each place of business.

    A separate special tax shall be paid for each place where distilled 
spirits are used in the manufacture or production of nonbeverage 
products, except for any such place in a tax year for which no claim is 
filed, or no drawback is paid, on spirits used at that place.

Sec. 17.24  Time for payment of special tax.

    Special tax may be paid in advance of actual use of distilled 
spirits. Special tax shall be paid before a claimant may receive 
drawback. Special tax may be paid without penalty under 26 U.S.C. 
5134(c) at any time prior to completion of final action on the claim.

[[Page 31415]]

Special Tax Returns

Sec. 17.31  Filing of return and payment of special tax.

    Special tax shall be paid by return. The prescribed return is ATF 
Form 5630.5, Special Tax Registration and Return. Special tax returns, 
with payment of tax, shall be filed with ATF in accordance with 
instructions on the form.

(26 U.S.C. 609l, 6151)

Sec. 17.32  Completion of ATF Form 5630.5.

    (a) General. All of the information called for on Form 5630.5 shall 
be provided, including:
    (1) The true name of the taxpayer.
    (2) The trade name(s) (if any) of the business(es) subject to 
special tax.
    (3) The employer identification number (see Secs. 17.41-43).
    (4) The exact location of the place of business, by name and number 
of building or street, or if these do not exist, by some description in 
addition to the post office address. In the case of one return for two 
or more locations, the address to be shown shall be the taxpayer's 
principal place of business (or principal office, in the case of a 
corporate taxpayer).
    (5) The class of special tax to which the taxpayer is subject.
    (6) Ownership and control information: The name, position, and 
residence address of every owner of the business and of every person 
having power to control its management and policies with respect to the 
activity subject to special tax. ``Owner of the business'' shall 
include every partner if the taxpayer is a partnership, and every 
person owning 10% or more of its stock if the taxpayer is a 
corporation. However, the ownership and control information required by 
this paragraph need not be stated if the same information has been 
previously provided to ATF, and if the information previously provided 
is still current.
    (b) Multiple locations. A taxpayer subject to special tax for the 
same period at more than one location or for more than one class of tax 
shall--
    (1) File one special tax return, ATF Form 5630.5, with payment of 
tax, to cover all such locations and classes of tax; and
    (2) Prepare, in duplicate, a list identified with the taxpayer's 
name, address (as shown on the Form 5630.5), employer identification 
number, and period covered by the return. The list shall show, by 
States, the name, address, and tax class of each location for which 
special tax is being paid. The original of the list shall be filed with 
ATF in accordance with instructions on the return, and the copy shall 
be retained at the taxpayer's principal place of business (or principal 
office, in the case of a corporate taxpayer) for the period specified 
in Sec. 17.170.

(26 U.S.C. 6011, 7011)

Sec. 17.33  Signature on returns, ATF Form 5630.5.

    The return of an individual proprietor shall be signed by the 
proprietor; the return of a partnership shall be signed by a general 
partner; and the return of a corporation shall be signed by a corporate 
officer. All signatures must be original; photocopies are not 
acceptable. In each case, the person signing the return shall designate 
his or her capacity, as ``individual owner,'' ``member of 
partnership,'' or, in the case of a corporation, the title of the 
officer. Receivers, trustees, assignees, executors, administrators, and 
other legal representatives who continue the business of a bankrupt, 
insolvent, deceased person, etc., shall indicate the fiduciary capacity 
in which they act.

Sec. 17.34  Verification of returns.

    ATF Forms 5630.5 shall contain or be verified by a written 
declaration that the return is made under the penalties of perjury.

(68A Stat. 749 (26 U.S.C. 6065))
Employer Identification Number

Sec. 17.41  Requirement for employer identification number.

    The employer identification number (defined in 26 CFR 301.7701-12) 
of the taxpayer who has been assigned such a number shall be shown on 
each special tax return (ATF Form 5630.5), including amended returns 
filed under this subpart. Failure of the taxpayer to include the 
employer identification number on Form 5630.5 may result in assertion 
and collection of the penalty specified in Sec. 70.113 of this chapter.

(Secs. 1(a), (b), Pub. L. 87-397, 75 Stat. 828 (26 U.S.C. 6109, 
6723))

Sec. 17.42  Application for employer identification number.

    (a) An employer identification number is assigned pursuant to 
application on IRS Form SS-4, Application for Employer Identification 
Number, filed by the taxpayer. Form SS-4 may be obtained from any 
office of the Internal Revenue Service.
    (b) Each taxpayer who files a return on ATF Form 5630.5 shall make 
application on IRS Form SS-4 for an employer identification number, 
unless he or she has already been assigned such a number or made 
application for one. The application on Form SS-4 shall be filed on or 
before the seventh day after the date on which the first return on Form 
5630.5 is filed.
    (c) Each taxpayer shall make application for and shall be assigned 
only one employer identification number, regardless of the number of 
places of business for which the taxpayer is required to file Form 
5630.5.

(Sec. 1(a), Pub. L. 87-397, 75 Stat. 828 (26 U.S.C. 6109))

Sec. 17.43  Preparation and filing of Form SS-4.

    The taxpayer shall prepare and file the application on IRS Form SS-
4, together with any supplementary statement, in accordance with 
instructions on the form or issued in respect to it.

(Sec. 1(a), Pub. L. 87-397, 75 Stat. 828 (26 U.S.C. 6109))

Subpart D--Special Tax Stamps

Sec. 17.51  Issuance of stamps.

     Each manufacturer of nonbeverage products, upon filing a properly 
executed return on ATF Form 5630.5, together with the proper tax 
payment in the full amount due, shall be issued a special tax stamp 
designated ``Manufacturer of Nonbeverage Products.'' This special tax 
stamp shall not be sold or otherwise transferred to another person 
(except as provided in Secs. 17.71 and 17.72). If the Form 5630.5 
submitted with the tax payment covers multiple locations, the taxpayer 
shall be issued one appropriately designated stamp for each location 
listed in the attachment to Form 5630.5 required by Sec. 17.32(b)(2), 
but showing, as to name and address, only the name of the taxpayer and 
the address of the taxpayer's principal place of business (or principal 
office in the case of a corporate taxpayer).

Sec. 17.52  Distribution of stamps for multiple locations.

    On receipt of the special tax stamps, the taxpayer shall verify 
that a stamp has been obtained for each location listed on the retained 
copy of the attachment to ATF Form 5630.5 required by Sec. 17.32(b)(2). 
The taxpayer shall designate one stamp for each location and shall type 
on it the trade name (if different from the name in which the stamp was 
issued) and address of the business conducted at the location for which 
the stamp is designated. The taxpayer shall then forward each stamp to 
the place of business designated on the stamp.

Sec. 17.53  Correction of errors on stamps.

    (a) Single location. On receipt of a special tax stamp, the 
taxpayer shall

[[Page 31416]]

examine it to ensure that the name and address are correctly stated. If 
an error has been made, the taxpayer shall return the stamp to ATF at 
the address shown thereon, with a statement showing the nature of the 
error and setting forth the proper name or address. On receipt of the 
stamp and statement, the data shall be compared with that on ATF Form 
5630.5, and if an error on the part of ATF has been made, the stamp 
shall be corrected and returned to the taxpayer. If the Form 5630.5 
agrees with the data on the stamp, the taxpayer shall be required to 
file a new Form 5630.5, designated ``Amended Return,'' disclosing the 
proper name and address.
    (b) Multiple locations. If an error is discovered on a special tax 
stamp obtained under the provisions of Sec. 17.32(b), relating to 
multiple locations, and if the error concerns any of the information 
contained in the attachment to Form 5630.5, the taxpayer shall return 
the stamp, with a statement showing the nature of the error and the 
correct data, to his or her principal office. The data on the stamp 
shall then be compared with the taxpayer's copy of the attachment to 
Form 5630.5, retained at the principal office. If the error is in the 
name and address and was made by the taxpayer, the taxpayer shall 
correct the stamp and return it to the designated place of business. If 
the error was made in the attachment to Form 5630.5, the taxpayer shall 
file with ATF an amended Form 5630.5 and an amended attachment with a 
statement showing the error.

Sec. 17.54  Lost or destroyed stamps.

    If a special tax stamp is lost or accidentally destroyed, the 
taxpayer shall immediately notify the regional director (compliance). 
On receipt of this notification, the regional director (compliance) 
shall issue to the taxpayer a ``Certificate in Lieu of Lost or 
Destroyed Special Tax Stamp.'' The taxpayer shall keep the certificate 
available for inspection in the same manner as prescribed for a special 
tax stamp in Sec. 17.55.

Sec. 17.55  Retention of special tax stamps.

    Taxpayers shall keep their special tax stamps at the place of 
business covered thereby for the period specified in Sec. 17.170, and 
shall make them available for inspection by any ATF officer during 
business hours.

(Title II, sec. 201, Pub. L. 85-859, 72 Stat. 1348 (26 U.S.C. 5146))
Change in Location

Sec. 17.61  General.

    A manufacturer who, during a tax year for which special tax has 
been paid, moves its place of manufacture to a place other than that 
specified on the related special tax stamp, shall register the change 
with ATF within 90 days after the move to the new premises, by 
executing a new return on ATF Form 5630.5, designated as ``Amended 
Return.'' This Amended Return shall set forth the time of the move and 
the address of the new location. The taxpayer shall also submit the 
special tax stamp to ATF, for endorsement of the change in location.

(Title II, sec. 201, Pub. L. 85-859, 72 Stat. 1374 (26 U.S.C. 5143))

Sec. 17.62  Failure to register.

    A manufacturer who fails to register a change of location with ATF, 
as required by Sec. 17.61, shall pay a new special tax for the new 
location if a claim for drawback is filed on distilled spirits used at 
the new location during the tax year for which the original special tax 
was paid.

Sec. 17.63  Certificates in lieu of lost stamps.

    The provisions of Secs. 17.61 and 17.62 apply to certificates 
issued in lieu of lost or destroyed special tax stamps.
Change in Control

Sec. 17.71  General.

    Certain persons, other than the person who paid the special tax, 
may qualify for succession to the same privileges granted by law to the 
taxpayer, to cover the remainder of the tax year for which the special 
tax was paid. Those who may qualify are specified in Sec. 17.72. To 
secure these privileges, the successor or successors shall file with 
ATF, within 90 days after the date on which the successor or successors 
assume control, a return on ATF Form 5630.5, showing the basis of the 
succession.

Sec. 17.72  Right of succession.

    Under the conditions set out in Sec. 17.71, persons listed below 
have the right of succession:
    (a) The surviving spouse or child, or executor, administrator, or 
other legal representative of a taxpayer.
    (b) A husband or wife succeeding to the business of his or her 
living spouse.
    (c) A receiver or trustee in bankruptcy, or an assignee for the 
benefit of creditors.
    (d) The members of a partnership remaining after the death or 
withdrawal of a general partner.

Sec. 17.73  Failure to register.

    A person eligible for succession to the privileges of a taxpayer, 
in accordance with Secs. 17.71 and 17.72, who fails to register the 
succession with ATF, as required by Sec. 17.71, shall pay a new special 
tax if a claim for drawback is filed on distilled spirits used by the 
successor during the tax year for which the original special tax was 
paid.

Sec. 17.74  Certificates in lieu of lost stamps.

    The provisions of Secs. 17.71-73 apply to certificates issued in 
lieu of lost or destroyed special tax stamps.

Sec. 17.75  Formation of partnership or corporation.

    If one or more persons who have paid special tax form a partnership 
or corporation, as a separate legal entity, to take over the business 
of manufacturing nonbeverage products, the new firm or corporation 
shall pay a new special tax in order to be eligible to receive 
drawback.

Sec. 17.76  Addition or withdrawal of partners.

    (a) General partners. When a business formed as a partnership, 
subject to special tax, admits one or more new general partners, the 
new partnership shall pay a new special tax in order to be eligible to 
receive drawback. Withdrawal of general partners is covered by 
Sec. 17.72(d).
    (b) Limited partners. Changes in the membership of a limited 
partnership requiring amendment of the certificate but not dissolution 
of the partnership are not changes that incur liability to additional 
special tax.

Sec. 17.77  Reincorporation.

    When a new corporation is formed to take over and conduct the 
business of one or more corporations that have paid special tax, the 
new corporation shall pay special tax and obtain a stamp in its own 
name.
Change in Name or Style

Sec. 17.81  General.

    A person who paid special tax is not required to pay a new special 
tax by reason of a mere change in the trade name or style under which 
the business is conducted, nor by reason of a change in management 
which involves no change in the proprietorship of the business.

Sec. 17.82  Change in capital stock.

    A new special tax is not required by reason of a change of name or 
increase in the capital stock of a corporation, if the laws of the 
State of incorporation provide for such changes without creating a new 
corporation.

Sec. 17.83  Sale of stock.

    A new special tax is not required by reason of the sale or transfer 
of all or a controlling interest in the capital stock of a corporation.

[[Page 31417]]

Refund of Special Tax

Sec. 17.91  Absence of liability, refund of special tax.

    The special tax paid may be refunded if it is established that the 
taxpayer did not file a claim for drawback for the period covered by 
the special tax stamp. If a claim for drawback is filed, the special 
tax may be refunded if no drawback is paid or allowed for the period 
covered by the stamp.

Sec. 17.92  Filing of refund claim.

    Claim for refund of special tax shall be filed on ATF Form 2635 
(5620.8), Claim--Alcohol, Tobacco and Firearms Taxes. The claim shall 
be filed with the Chief, Tax Processing Center, PO Box 145433, 
Cincinnati, OH 45203. The claim shall set forth in detail sufficient 
reasons and supporting facts to inform the regional director 
(compliance) of the exact basis of the claim. The special tax stamp 
shall be attached to the claim.

(68A Stat. 791 (26 U.S.C. 6402))

Sec. 17.93  Time limit for filing refund claim.

    A claim for refund of special tax shall not be allowed unless filed 
within three years after the payment of the tax.

(68A Stat. 808 (26 U.S.C. 6511))

Subpart E--Bonds and Consents of Sureties

Sec. 17.101  General.

    A bond shall be filed by each person claiming drawback on a monthly 
basis. Persons who claim drawback on a quarterly basis are not required 
to file bonds. Bonds shall be prepared and executed on ATF Form 5154.3, 
Bond for Drawback Under 26 U.S.C. 5131, in accordance with the 
provisions of this part and the instructions printed on the form. The 
bond requirement of this part shall be satisfied either by bonds 
obtained from authorized surety companies or by deposit of collateral 
security. Regional directors (compliance) are authorized to approve all 
bonds and consents of surety required by this part.

Sec. 17.102  Amount of bond.

    The bond shall be a continuing one, in an amount sufficient to 
cover the total drawback to be claimed on spirits used during any 
quarter. However, the amount of any bond shall not exceed $200,000 nor 
be less than $1,000.

 Sec. 17.103  Bonds obtained from surety companies.

    (a) The bond may be obtained from any surety company authorized by 
the Secretary of the Treasury to be a surety on Federal bonds. Surety 
companies so authorized are listed in the current revision of 
Department of the Treasury Circular 570 (Companies Holding Certificates 
of Authority as Acceptable Sureties on Federal Bonds and as Acceptable 
Reinsuring Companies), and subject to such amendatory circulars as may 
be issued from time to time. Bonds obtained from surety companies are 
also governed by the provisions of 31 U.S.C. 9304, and 31 CFR part 223.
    (b) A bond executed by two or more surety companies shall be the 
joint and several liability of the principal and the sureties; however, 
each surety company may limit its liability, in terms upon the face of 
the bond, to a definite, specified amount. This amount shall not exceed 
the limitations prescribed for each surety company by the Secretary, as 
stated in Department of the Treasury Circular 570. If the sureties 
limit their liability in this way, the total of the limited liabilities 
shall equal the required amount of the bond.
     (c) Department of the Treasury Circular No. 570 is published in 
the Federal Register annually on the first workday in July. As they 
occur, interim revisions of the circular are published in the Federal 
Register. Copies of the circular may be obtained from: Surety Bond 
Branch, Financial Management Service, Department of the Treasury, 
Washington, DC 20227.

(Sec. 1, Pub. L. 97-258, 96 Stat. 1047 (31 U.S.C. 9304))

Sec. 17.104  Deposit of collateral.

    Except as otherwise provided by law or regulations, bonds or notes 
of the United States, or other obligations which are unconditionally 
guaranteed as to both interest and principal by the United States, may 
be pledged and deposited by principals as collateral security in lieu 
of bonds obtained from surety companies. Deposit of collateral security 
is governed by the provisions of 31 U.S.C. 9303, and 31 CFR part 225.

(Sec. 1, Pub. L. 97-258, 96 Stat. 1046 (31 U.S.C. 9301, 9303))

Sec. 17.105  Filing of powers of attorney.

    (a) Surety companies. The surety company shall prepare and submit 
with each bond, and with each consent to changes in the terms of a 
bond, a power of attorney in accordance with Sec. 17.6, authorizing the 
agent or officer who executed the bond or consent to act in this 
capacity on behalf of the surety. The power of attorney shall be 
prepared on a form provided by the surety company and executed under 
the corporate seal of the company. If other than a manually signed 
original is submitted, it shall be accompanied by certification of its 
validity.
    (b) Principal. The principal shall execute and file with the 
regional director (compliance) a power of attorney, in accordance with 
Sec. 17.6, for every person authorized to execute bonds on behalf of 
the principal.

(Sec. 1, Pub. L. 97-258, 96 Stat. 1047 (31 U.S.C. 9304, 9306))

Sec. 17.106  Consents of surety.

    The principal and surety shall execute on ATF Form 1533 (5000.18), 
Consent of Surety, any consents of surety to changes in the terms of 
bonds. Form 1533 (5000.18) shall be executed with the same formality 
and proof of authority as is required for the execution of bonds.

Sec. 17.107  Strengthening bonds.

    Whenever the amount of a bond on file and in effect becomes 
insufficient, the principal may give a strengthening bond in a 
sufficient amount, provided the surety is the same as on the bond 
already on file and in effect; otherwise a superseding bond covering 
the entire liability shall be filed. Strengthening bonds, filed to 
increase the bond liability of the surety, shall not be construed in 
any sense to be substitute bonds, and the regional director 
(compliance) shall not approve a strengthening bond containing any 
notation which may be interpreted as a release of any former bond or as 
limiting the amount of either bond to less than its full amount.

Sec. 17.108  Superseding bonds.

    (a) The principal on any bond filed pursuant to this part may at 
any time replace it with a superseding bond.
    (b) Executors, administrators, assi
FR Doc. 96-14881 Taxpaid Distilled Spirits Used in Manufacturing Products Unfit for Beverage Use (73R-24P)
gnees, receivers, trustees, or 
other persons acting in a fiduciary capacity continuing or liquidating 
the business of the principal, shall execute and file a superseding 
bond or obtain the consent of the surety or sureties on the existing 
bond or bonds.
    (c) When, in the opinion of the regional director (compliance), the 
interests of the Government demand it, or in any case where the 
security of the bond becomes impaired in whole or in part for any 
reason whatever, the principal shall file a superseding bond. A 
superseding bond shall be filed immediately in case of the insolvency 
of the surety. If a bond is found to be not acceptable or for any 
reason becomes invalid or of no effect, the principal shall immediately 
file a satisfactory superseding bond.
    (d) A bond filed under this section to supersede an existing bond 
shall be marked by the obligors at the time of execution, ``Superseding 
Bond.'' When

[[Page 31418]]

such a bond is approved, the superseded bond shall be released as to 
transactions occurring wholly subsequent to the effective date of the 
superseding bond, and notice of termination of the superseded bond 
shall be issued, as provided in Sec. 17.111.
Termination of Bonds

Sec. 17.111   General.

    (a) Bonds on ATF Form 5154.3 shall be terminated by the regional 
director (compliance), as to liability on drawback allowed after a 
specified future date, in the following circumstances:
    (1) Pursuant to a notice by the surety as provided in Sec. 17.112.
    (2) Following approval of a superseding bond, as provided in 
Sec. 17.108.
    (3) Following notification by the principal of an intent to 
discontinue the filing of claims on a monthly basis.
    (b) However, the bond shall not be terminated until all outstanding 
liability under it has been discharged. Upon termination, the regional 
director (compliance) shall mark the bond ``canceled,'' followed by the 
date of cancellation, and shall issue a notice of termination of bond. 
A copy of this notice shall be given to the principal and to each 
surety.

Sec. 17.112   Notice by surety of termination of bond.

    A surety on any bond required by this part may at any time, in 
writing, notify the principal and the regional director (compliance) in 
whose office the bond is on file that the surety desires, after a date 
named, to be relieved of liability under the bond. Unless the notice is 
withdrawn, in writing, before the date named in it, the notice shall 
take effect on that date. The date shall not be less than 60 days after 
the date on which both the notice and proof of service on the principal 
have been received by the regional director (compliance). The surety 
shall deliver one copy of the notice to the principal and the original 
to the regional director (compliance). The surety shall also file with 
the regional director (compliance) an acknowledgment or other proof of 
service on the principal.

Sec. 17.113   Extent of release of surety from liability under bond.

    The rights of the principal as supported by the bond shall cease as 
of the date when termination of the bond takes effect, and the surety 
shall be relieved from liability for drawback allowed on and after that 
date. Liability for drawback previously allowed shall continue until 
the claims for such drawback have been properly verified by the 
regional director (compliance) according to law and this part.

Sec. 17.114   Release of collateral.

    The release of collateral security pledged and deposited to satisfy 
the bond requirement of this part is governed by the provisions of 31 
CFR part 225. When the regional director (compliance) determines that 
there is no outstanding liability under the bond, and is satisfied that 
the interests of the Government will not be jeopardized, the security 
shall be released and returned to the principal.

(Sec. 1, Pub. L. 97-258, 96 Stat. 1046 (31 U.S.C. 9301, 9303))

Subpart F--Formulas and Samples

Sec. 17.121   Product formulas.

    (a) General. Except as provided in Secs. 17.132 and 17.182, 
manufacturers shall file quantitative formulas for all preparations for 
which they intend to file drawback claims. Such formulas shall state 
the quantity of each ingredient, and shall separately state the 
quantity of spirits to be recovered or to be consumed as an essential 
part of the manufacturing process.
    (b) Filing. Formulas shall be filed with the Alcohol and Tobacco 
Laboratory on ATF Form 5154.1, Formula and Process for Nonbeverage 
Products. Filing shall be accomplished no later than 6 months after the 
end of the quarter in which taxpaid distilled spirits were first used 
to manufacture the product for purposes of drawback. If a product's 
formula is disapproved, no drawback shall be allowed on spirits used to 
manufacture that product, unless it is later used as an intermediate 
product, as provided in Sec. 17.137.
    (c) Numbering. The formulas shall be serially numbered by the 
manufacturer, commencing with number 1 and continuing thereafter in 
numerical sequence. However, a new formula for use at several plants 
shall be given the highest number next in sequence at any of those 
plants. The numbers that were skipped at the other plants shall not be 
used subsequently.
    (d) Distribution and retention of approved formulas. One copy of 
each approved Form 5154.1 shall be returned to the manufacturer. The 
formulas returned to manufacturers shall be kept in serial order at the 
place of manufacture, as provided in Sec. 17.170, and shall be made 
available to ATF officers for examination in the investigation of 
drawback claims.

Sec. 17.122  Amended or revised formulas.

    Except as provided in this section, amended or revised formulas are 
considered to be new formulas and shall be numbered accordingly. Minor 
changes may be made to a current formula on ATF Form 5154.1 with 
retention of the original formula number, if approval is obtained from 
the Director. In order to obtain approval to make a minor formula 
change, the person holding the Form 5154.1 shall submit a letter of 
application to the Alcohol and Tobacco Laboratory, indicating the 
formula change and requesting that the proposed change be considered a 
minor change. Each such application shall clearly identify the original 
formula by number, date of approval, and name of product. The 
application shall indicate whether the product is, has been, or will be 
used in alcoholic beverages, and shall specify whether the proposed 
change is intended as a substitution or merely as an alternative for 
the original formula. No changes may be made to current formulas 
without specific ATF approval in each case.

Sec. 17.123  Statement of process.

    Any person claiming drawback under the regulations in this part may 
be required, at any time, to file a statement of process, in addition 
to that required by ATF Form 5154.1, as well as any other data 
necessary for consideration of the claim for drawback. When pertinent 
to consideration of the claim, submission of copies of the commercial 
labels used on the finished products may also be required.

Sec. 17.124  Samples.

    Any person claiming drawback or submitting a formula for approval 
under the regulations in this part may be required, at any time, to 
submit a sample of each nonbeverage or intermediate product for 
analysis. If the product is manufactured with a mixture of oil or other 
ingredients, the composition of which is unknown to the claimant, a 1-
ounce sample of the mixture shall be submitted with the sample of 
finished product when so required.

Sec. 17.125  Adoption of formulas and processes.

    (a) Adoption of predecessor's formulas. If there is a change in the 
proprietorship of a nonbeverage plant and the successor desires to use 
the predecessor's formulas at the same location, the successor may, in 
lieu of submitting new formulas in its own name, adopt any or all of 
the formulas of the predecessor by filing a notice of

[[Page 31419]]

adoption with the regional director (compliance). The notice shall be 
filed with the first claim relating to any of the adopted formulas. The 
notice shall list, by name and serial number, all formulas to be 
adopted, and shall state that the products will be manufactured in 
accordance with the adopted formulas and processes. The notice shall be 
accompanied by a certified copy of the articles of incorporation or 
other document(s) necessary to prove the transfer of ownership. The 
manufacturer shall retain a copy of the notice with the related 
formulas.
    (b) Adoption of manufacturer's own formulas from a different 
location. A manufacturer's own formulas may be adopted for use at 
another of the manufacturer's plants. Further, a wholly owned 
subsidiary may adopt the formulas of the parent company, and vice 
versa. The procedure for such adoption shall be by filing a letterhead 
notice, accompanied by two photocopies of each formula to be adopted, 
with the Alcohol and Tobacco Laboratory for transmittal to the regional 
director (compliance). The notice shall list the numbers of all 
formulas to be adopted and shall indicate the plant where each was 
originally approved and the plant(s) where each is to be adopted. Some 
evidence of the relationship between the plants involved in the 
adoption shall be attached to the notice. The notice shall be 
referenced in Part IV of the supporting data (ATF Form 5154.2) filed 
with the first claim relating to the adopted formula(s).

Sec. 17.126  Formulas for intermediate products.

    (a) The manufacturer shall submit a formula on ATF Form 5154.1 to 
the Alcohol and Tobacco Laboratory for each self-manufactured 
ingredient made with taxpaid spirits and intended for the 
manufacturer's own use in nonbeverage products, unless the formula for 
any such ingredient is fully expressed as part of the approved formula 
for each nonbeverage product in which that ingredient is used, or 
unless the formula for the ingredient is contained in one of the 
pharmaceutical publications listed in Sec. 17.132.
    (b) Upon receipt of Form 5154.1 covering a self-manufactured 
ingredient made with taxpaid spirits, the formula shall be examined 
under Sec. 17.131. If the formula is approved for drawback, the 
ingredient shall be treated as a finished nonbeverage product for 
purposes of this part, rather than as an intermediate product, 
notwithstanding its use by the manufacturer. (For example, see 
Sec. 17.152(d).) If the formula is disapproved for drawback, the 
ingredient may be treated as an intermediate product in accordance with 
this part. Requirements pertaining to intermediate products are found 
in Sec. 17.185(b).
    (c) If there is a change in the composition of an intermediate 
product, the manufacturer shall submit an amended or revised formula, 
as provided in Sec. 17.122.

Sec. 17.127  Self-manufactured ingredients treated optionally as 
unfinished nonbeverage products.

    A self-manufactured ingredient made with taxpaid spirits, which 
otherwise would be treated as an intermediate product, may instead be 
treated as an unfinished nonbeverage product, if the ingredient's 
formula is fully expressed as a part of the approved formula for the 
nonbeverage product in which the ingredient will be used. A 
manufacturer desiring to change the treatment of an ingredient from 
``intermediate product'' to ``unfinished nonbeverage product'' (or vice 
versa) may do so by resubmitting the applicable formula(s) on ATF Form 
5154.1. Requirements pertaining to unfinished nonbeverage products are 
found in Sec. 17.185(c).
Approval of Formulas

Sec. 17.131  Formulas on ATF Form 5154.1.

    Upon receipt by the Alcohol and Tobacco Laboratory, formulas on ATF 
Form 5154.1 shall be examined and, if found to be medicines, medicinal 
preparations, food products, flavors, flavoring extracts, or perfume 
which are unfit for beverage purposes and which otherwise meet the 
requirements of law and this part, they shall be approved for drawback. 
If the formulas do not meet the requirements of the law and regulations 
for drawback products, they shall be disapproved.

Sec. 17.132  U.S.P., N.F., and H.P.U.S. preparations.

    (a) General. Except as otherwise provided by paragraph (b) of this 
section or by ATF ruling, formulas for compounds in which alcohol is a 
prescribed quantitative ingredient, which are stated in the current 
revisions or editions of the United States Pharmacopoeia (U.S.P.), the 
National Formulary (N.F.), or the Homeopathic Pharmacopoeia of the 
United States (H.P.U.S.), shall be considered as approved formulas and 
may be used as formulas for drawback products without the filing of ATF 
Form 5154.1.
    (b) Exceptions. Alcohol (including dehydrated alcohol and 
dehydrated alcohol injection), U.S.P.; alcohol and dextrose injection, 
U.S.P.; and tincture of ginger, H.P.U.S., have been found to be fit for 
beverage use and are disapproved for drawback. All attenuations of 
other H.P.U.S. products diluted beyond one part in 10,000 (``4 x '') 
are also disapproved for drawback, unless the manufacturer receives 
approval for a formula submitted on Form 5154.1 in accordance with this 
subpart. The formula for such attenuations shall be submitted with a 
sample of the product and a statement explaining why it should be 
classified as unfit for beverage use.

Sec. 17.133  Food product formulas.

    Formulas for nonbeverage food products on ATF Form 5154.1 may be 
approved if they are unfit for beverage purposes. Approval does not 
authorize manufacture or sale contrary to State law. Examples of food 
products that have been found to be unfit for beverage purposes are 
stated below:
    (a) Sauces or syrups. Sauces, or syrups consisting of sugar 
solutions and distilled spirits, in which the alcohol content is not 
more than 12 percent by volume and the sugar content is not less than 
60 grams per 100 cubic centimeters.
    (b) Brandied fruits. Brandied fruits consisting of solidly packaged 
fruits, either whole or segmented, and distilled spirits products not 
exceeding the quantity and alcohol content necessary for flavoring and 
preserving. Generally, brandied fruits will be considered to have met 
these standards if the container is well filled, the alcohol in the 
liquid portion does not exceed 23 percent by volume, and the liquid 
portion does not exceed 45 percent of the volume of the container.
    (c) Candies. Candies with alcoholic fillings, if the fillings meet 
the standards prescribed for sauces and syrups by paragraph (a) of this 
section.
    (d) Other food products. Food products such as mincemeat, plum 
pudding, and fruit cake, where only sufficient distilled spirits are 
used for flavoring and preserving; and ice cream and ices where only 
sufficient spirits are used for flavoring purposes. Also food adjuncts, 
such as preservatives, emulsifying agents, and food colorings, that are 
unfit for beverage purposes and are manufactured and used, or sold for 
use, in food.

Sec. 17.134  Determination of unfitness for beverage purposes.

    The Director has responsibility for determining whether products 
are fit or unfit for beverage purposes within the meaning of 26 U.S.C. 
5131. This determination may be based either on the content and 
description of the

[[Page 31420]]

ingredients as shown on ATF Form 5154.1, or on organoleptic 
examination. In such examination, samples of products may be diluted 
with water to an alcoholic concentration of 15% and tasted. Sale or use 
for beverage purposes is indicative of fitness for beverage use.

Sec. 17.135  Use of specially denatured alcohol (S.D.A.).

    (a) Use of S.D.A. in nonbeverage or intermediate products--(1) 
General. Except as provided in paragraph (b) of this section, the use 
of specially denatured alcohol (S.D.A.) and taxpaid spirits in the same 
product by a nonbeverage manufacturer is prohibited where drawback of 
tax is claimed.
    (2) Alternative formulations. No formula for a product on ATF Form 
5154.1 shall be approved for drawback under this subpart if the 
manufacturer also has on file an approved ATF Form 1479-A or Form 
5150.19, Formula for Article Made With Specially Denatured Alcohol or 
Rum, pertaining to the same product.
    (b) Use of S.D.A. in ingredients--(1) Purchased ingredients. 
Generally, purchased ingredients containing S.D.A. may be used in 
nonbeverage or intermediate products. However, such ingredients shall 
not be used in medicinal preparations or flavoring extracts intended 
for internal human use, where any of the S.D.A. remains in the finished 
product.
    (2) Self-manufactured ingredients. Self-manufactured ingredients 
may be made with S.D.A. and used in nonbeverage or intermediate 
products, provided--
    (i) No taxpaid spirits are used in manufacturing such ingredients; 
and
    (ii) All S.D.A. is recovered or dissipated from such ingredients 
prior to their use in nonbeverage or intermediate products. (Recovery 
of S.D.A. shall be in accordance with subpart K of part 20 of this 
chapter; recovered S.D.A., with or without its original denaturants, 
shall not be reused in nonbeverage or intermediate products.)

(Sec. 201, Pub. L. 85-859, 72 Stat. 1372, as amended (26 U.S.C. 
5273))

Sec. 17.136  Compliance with Food and Drug Administration requirements.

    A product is not a medicine, medicinal preparation, food product, 
flavor, flavoring extract, or perfume for nonbeverage drawback if its 
formula would violate a ban or restriction of the U.S. Food and Drug 
Administration (FDA) pertaining to such products. If FDA bans or 
restricts the use of any ingredient in such a way that further 
manufacture of a product in accordance with its formula would violate 
the ban or restriction, then the manufacturer shall change the formula 
and resubmit it on ATF Form 5154.1 to the Alcohol and Tobacco 
Laboratory. This section does not preclude approval for products 
manufactured solely for export or for uses other than internal human 
consumption (e.g. tobacco flavors or animal feed flavors) in accordance 
with laws and regulations administered by FDA. Under Sec. 17.123, 
manufacturers may be required to demonstrate compliance with FDA 
requirements applicable to this section.

Sec. 17.137  Formulas disapproved for drawback.

    A formula may be disapproved for drawback either because it does 
not prescribe appropriate ingredients in sufficient quantities to make 
the product unfit for beverage use, or because the product is neither a 
medicine, a medicinal preparation, a food product, a flavor, nor a 
flavoring extract. The formula for a disapproved product may be used as 
an intermediate product formula under Sec. 17.126. No drawback will be 
allowed on distilled spirits used in a disapproved product, unless that 
product is later used in the manufacture of an approved nonbeverage 
product. In the case of a product that is disapproved because it is fit 
for beverage use, any further use or disposition of such a product, 
other than as an intermediate product in accordance with this part, 
subjects the manufacturer to the qualification requirements of parts 1 
and 19 of this chapter.

Subpart G--Claims for Drawback

Sec. 17.141  Drawback.

    Upon the filing of a claim as provided in this subpart, drawback 
shall be allowed to any person who meets the requirements of this part. 
Drawback shall be paid at the rate specified by 26 U.S.C. 5134 on each 
proof gallon of distilled spirits on which the tax has been paid or 
determined and which have been used in the manufacture of nonbeverage 
products. The drawback rate is $1.00 less than the effective tax rate. 
Drawback shall be allowed only to the extent that the claimant can 
establish, by evidence satisfactory to the regional director 
(compliance), the actual quantity of taxpaid or tax-determined 
distilled spirits used in the manufacture of the product, and the 
effective tax rate applicable to those spirits. Special tax as a 
manufacturer of nonbeverage products shall be paid before drawback is 
allowed.

Sec. 17.142  Claims.

    (a) General. The manufacturer shall file claim for drawback with 
the regional director (compliance) for the region in which the place of 
manufacture is located. A separate claim shall be filed for each place 
of business. Each claim shall pertain only to distilled spirits used in 
the manufacture or production of nonbeverage products during any one 
quarter of the tax year. Unless the manufacturer is eligible to file 
monthly claims (see Secs. 17.143 and 17.144), only one claim per 
quarter may be filed for each place of business. The regional director 
(compliance) has the authority to approve or disapprove claims. Claims 
shall be filed on ATF Form 2635 (5620.8), Claim--Alcohol and Tobacco 
Taxes.
    (b) Manufacturers who are also proprietors of distilled spirits 
plants. If a manufacturer of nonbeverage products is owned and operated 
by the same business entity that owns and operates a distilled spirits 
plant, the manufacturer's claim for drawback may be filed for credit on 
Form 2635 (5620.8). After the claim is approved, the distilled spirits 
plant may use the claim as an adjustment decreasing the taxes due in 
Schedule B of ATF Form 5000.24, Excise Tax Return. Adjustments 
resulting from an approved drawback claim are not subject to interest. 
This procedure may be utilized only if the manufacturer of nonbeverage 
products and the distilled spirits plant have the same employer 
identification number.

Sec. 17.143  Notice for monthly claims.

    If the manufacturer has notified the regional director 
(compliance), in writing, of an intention to file claims on a monthly 
basis instead of a quarterly basis, and has filed a bond in compliance 
with the provisions of this part, claims may be filed monthly instead 
of quarterly. The election to file monthly claims shall not preclude a 
manufacturer from filing a single claim covering an entire quarter, or 
a single claim covering just two months of a quarter, or two claims 
(one of them covering one month and the other covering two months). An 
election for the filing of monthly claims may be withdrawn by the 
manufacturer by filing a notice to that effect, in writing, with the 
regional director (compliance).

Sec. 17.144  Bond for monthly claims.

    Each person intending to file claims for drawback on a monthly 
basis shall file with the regional director (compliance) an executed 
bond on ATF Form 5154.3, conforming to the provisions of subpart E of 
this part. A

[[Page 31421]]

monthly drawback claim shall not be allowed until bond coverage in a 
sufficient amount has been approved by the regional director 
(compliance). When the limit of liability under a bond given in less 
than the maximum amount has been reached, further drawback on monthly 
claims may be suspended until a strengthening or superseding bond in a 
sufficient amount is furnished.

Sec. 17.145  Date of filing claim.

    Quarterly claims for drawback shall be filed with the regional 
director (compliance) within six months after the quarter in which the 
distilled spirits covered by the claim were used in the manufacture of 
nonbeverage products. Monthly claims for drawback may be filed at any 
time after the end of the month in which the distilled spirits covered 
by the claim were used in the manufacture of nonbeverage products, but 
shall be filed not later than the close of the sixth month succeeding 
the quarter in which the spirits were used.

Sec. 17.146  Information to be shown by the claim.

    The claim shall set forth the following:
    (a) Whether the special tax has been paid.
    (b) That the distilled spirits on which drawback is claimed were 
fully taxpaid or tax-determined at the effective tax rate applicable to 
the distilled spirits.
    (c) That the distilled spirits on which the drawback is claimed 
were used in the manufacture of nonbeverage products.
    (d) Whether the nonbeverage products were manufactured in 
compliance with quantitative formulas approved under subpart F of this 
part. (If not, attach explanation.)
    (e) That the data submitted in support of the claim are correct.

Sec. 17.147  Supporting data.

    (a) Each claim for drawback shall be accompanied by supporting data 
presented according to the format shown on ATF Form 5154.2, Supporting 
Data for Nonbeverage Drawback Claims (or according to any other 
suitable format which provides the same information). Modifications of 
Form 5154.2 may be used without prior authorization, if the modified 
format clearly shows all of the required information that is pertinent 
to the manufacturing operation. Under Sec. 17.123, the regional 
director (compliance) may require additional supporting data when 
needed to determine the correctness of drawback claims.
    (b) Separate data shall be shown for eligible distilled spirits 
taxpaid at different effective tax rates. This requirement applies to 
all eligible spirits, including eligible recovered alcohol and eligible 
spirits contained in intermediate products.
    (c) Separate data shall be shown for imported rum, spirits from 
Puerto Rico containing at least 92% rum, and spirits from the U.S. 
Virgin Islands containing at least 92% rum. The total number of proof 
gallons of each such category used subject to drawback during the claim 
period shall also be shown, with separate totals for each effective tax 
rate. These amounts shall include eligible spirits and rum from 
intermediate products or recovered alcohol.
    (d) Any gain in eligible distilled spirits reported in the 
supporting data shall be reflected by an equivalent deduction from the 
amount of drawback claimed. Gains shall not be offset by known losses.

Sec. 17.148  Allowance of claims.

    (a) General. Except in the case of fraudulent noncompliance, no 
claim for drawback shall be denied for a failure to comply with either 
26 U.S.C. 5131-5134 or the requirements of this part, if the claimant 
establishes that spirits on which the tax has been paid or determined 
were in fact used in the manufacture of medicines, medicinal 
preparations, food products, flavors, flavoring extracts, or perfume, 
which were unfit for beverage purposes.
    (b) Penalty. Noncompliance with the requirements of 26 U.S.C. 5131-
5134 or of this part subjects the claimant to a civil penalty of $1,000 
for each separate product, reflected in a claim for drawback, to which 
the noncompliance relates, or the amount claimed for that product, 
whichever is less, unless the claimant establishes that the 
noncompliance was due to reasonable cause. Late filing of a claim 
subjects the claimant to a civil penalty of $1,000 or the amount of the 
claim, whichever is less, unless the claimant establishes that the 
lateness was due to reasonable cause.
    (c) Reasonable cause. Reasonable cause exists where a claimant 
establishes it exercised ordinary business care and prudence, and still 
was unable to comply with the statutory and regulatory requirements. 
Ignorance of law or regulations, in and of itself, is not reasonable 
cause. Each case is individually evaluated.

(Sec. 452, Pub. L. 98-369, 98 Stat. 819 (26 U.S.C. 5134(c))
Spirits Subject to Drawback

Sec. 17.151  Use of distilled spirits.

    Distilled spirits are considered to have been used in the 
manufacture of a product under this part if the spirits are consumed in 
the manufacture, are incorporated into the product, or are determined 
by ATF to have been otherwise utilized as an essential part of the 
manufacturing process. However, spirits lost by causes such as 
spillage, leakage, breakage or theft, and spirits used for purposes 
such as rinsing or cleaning a system, are not considered to have been 
used in the manufacture of a product.

Sec. 17.152  Time of use of spirits.

    (a) General. Distilled spirits shall be considered used in the 
manufacture of a product as soon as that product contains all the 
ingredients called for by its formula.
    (b) Spirits used in an ion exchange column. Distilled spirits used 
in recharging an ion exchange column, the operation of which is 
essential to the production of a product, shall be considered to be 
used when the spirits are entered into the manufacturing system in 
accordance with the product's formula.
    (c) Products requiring additional processing or treatment. Further 
manipulation of a product, such as aging or filtering, subsequent to 
the mixing together of all of its ingredients, shall not postpone the 
time when spirits are considered used, as determined under paragraph 
(a) of this section. This is true even if at the time of use there has 
not yet been a final determination of alcoholic content by assay. If, 
however, it is later found necessary to add more distilled spirits to 
standardize the product, such added spirits shall be considered as used 
in the period during which they were added.
    (d) Nonbeverage products used to manufacture other products. 
Nonbeverage products may be used to manufacture other nonbeverage (or 
intermediate) products. However, such subsequent usage of a nonbeverage 
product shall not affect the time when the distilled spirits contained 
therein are considered used. When distilled spirits are used in the 
manufacture of a nonbeverage product, the time of use shall be the 
point at which that product first contains all of its prescribed 
ingredients, and such use shall not be determined by the time of any 
subsequent usage of that product in another product.

Sec. 17.153  Recovered spirits.

    (a) Recovery from intermediate products. Eligible spirits recovered 
in the manufacture of intermediate products are not subject to drawback 
until such recovered spirits are used in the manufacture of a 
nonbeverage

[[Page 31422]]

product. (However, see Sec. 17.127 with respect to optional treatment 
of ingredients as unfinished nonbeverage products, rather than as 
intermediate products.) Spirits recovered in the manufacture of 
intermediate products shall be reused only in the manufacture of 
intermediate or nonbeverage products.
    (b) Recovery from nonbeverage products. Distilled spirits recovered 
in the manufacture of a nonbeverage product are considered as having 
been used in the manufacture of that product. If the spirits were 
eligible when so used, they became subject to drawback at that time. 
Upon recovery, such spirits may be reused in the manufacture of 
nonbeverage products, but shall not be reused for any other purpose. 
When reused, such recovered spirits are not again eligible for drawback 
and shall not be used in the manufacture of intermediate products.
    (c) Cross references. For additional provisions respecting the 
recovery of distilled spirits and related recordkeeping requirements, 
see Secs. 17.168 and 17.183.

Sec. 17.154  Spirits contained in intermediate products.

    Spirits contained in an intermediate product are not subject to 
drawback until that intermediate product is used in the manufacture of 
a nonbeverage product.

Sec. 17.155  Spirits consumed in manufacturing intermediate products.

    Spirits consumed in the manufacture of an intermediate product--
which are not contained in the intermediate product at the time of its 
use in nonbeverage products--are not subject to drawback. Such spirits 
are not considered to have been used in the manufacture of nonbeverage 
products. However, see Sec. 17.127 with respect to optional treatment 
of ingredients as unfinished nonbeverage products, rather than as 
intermediate products.

Subpart H--Records

Sec. 17.161  General.

    Each person claiming drawback on taxpaid distilled spirits used in 
the manufacture of nonbeverage products shall maintain records showing 
the information required in this subpart. No particular form is 
prescribed for these records, but the data required to be shown shall 
be clearly recorded and organized to enable ATF officers to trace each 
operation or transaction, monitor compliance with law and regulations, 
and verify the accuracy of each claim. Ordinary business records, 
including invoices and cost accounting records, are acceptable if they 
show the required information or are annotated to show any such 
information that is lacking. The records shall be kept complete and 
current at all times, and shall be retained by the manufacturer at the 
place covered by the special tax stamp for the period prescribed in 
Sec. 17.170.

Sec. 17.162  Receipt of distilled spirits.

    (a) Distilled spirits received in tank cars, tank trucks, barrels, 
or drums. For distilled spirits received in tank cars, tank trucks, 
barrels, or drums, the manufacturer shall record, with respect to each 
shipment received--
    (1) The date of receipt;
    (2) The name and address of the person from whom received;
    (3) The serial number or other identification mark (if any) of each 
tank car, tank truck, barrel, or drum;
    (4) The name of the producer or warehouseman who paid or determined 
the tax;
    (5) The effective tax rate (if other than the rate prescribed by 26 
U.S.C. 5001); and
    (6) The kind, quantity, and proof (or alcohol percentage by volume) 
of the spirits.
    (b) Distilled spirits received in bottles. For distilled spirits 
received in bottles, the manufacturer shall record--
    (1) The date of receipt;
    (2) The name and address of the seller;
    (3) The serial number of each case, if the bottles are received in 
cases;
    (4) The name of the bottler;
    (5) The effective tax rate (if other than the rate prescribed by 26 
U.S.C. 5001); and
    (6) The kind, quantity, and proof (or alcohol percentage by volume) 
of the spirits.
    (c) Distilled spirits received by pipeline. For distilled spirits 
received by pipeline, the manufacturer shall record--
    (1) The date of receipt;
    (2) The name of the producer or warehouseman who paid or determined 
the tax;
    (3) The effective tax rate (if other than the rate prescribed by 26 
U.S.C. 5001); and
    (4) The kind, quantity, and proof (or alcohol percentage by volume) 
of the spirits.
    (d) Determination of quantity. At the time of receipt, each 
manufacturer shall determine (preferably by weight) and record the 
exact number of proof gallons of distilled spirits received. The amount 
received in bottles may be determined by the required statements on the 
labels. The amount received in sealed drums with no evidence of leakage 
may be determined from the record of shipment, which is required by 
Sec. 19.780 of this chapter to accompany spirits received from a 
distilled spirits plant. If spirits are received in a tank car or tank 
truck, and the result of the manufacturer's gauge of the spirits is 
within 0.2 percent of the number of proof gallons reported on the 
record of shipment required by Sec. 19.780, then the number of proof 
gallons reported on that record may be recorded as the quantity 
received. Nevertheless, the receiving gauge shall be noted on the 
record of receipt. If, for any shipment, the amount recorded in the 
manufacturer's records as the quantity received is greater than the 
amount shown as taxpaid on the record required by Sec. 19.780, a 
deduction equivalent to the excess shall be made from the amount of 
drawback claimed in the manufacturer's claim covering that period. If 
no claim is filed for that period, then the deduction shall be made in 
the manufacturer's next claim. Losses in transit that exceed the 0.2 
percent limitation provided in this paragraph shall be determined and 
noted on the record of receipt. Such losses shall not be recorded as 
distilled spirits received.
    (e) Receipt of imported rum, or spirits from Puerto Rico or the 
Virgin Islands. If spirits are received which contain at least 92% rum, 
and which originate from Puerto Rico or the U.S. Virgin Islands, the 
record of receipt shall indicate the place of origin. If rum is 
received, the record shall indicate whether it is from Puerto Rico, 
from the U.S. Virgin Islands, imported from other countries, or 
domestic.
    (f) Shipments from distilled spirits plants. If spirits are 
received directly from the distilled spirits plant that paid or 
determined the tax, the manufacturer shall retain the record of 
shipment required by Sec. 19.780 of this chapter. To the extent that 
the information on that record duplicates the requirements of this 
section, retention of that record shall satisfy those requirements. If 
there are differences between the information on the record of shipment 
and the information required to be recorded by this section, the 
requirements of this section may be met by appropriate annotations on 
the record of shipment.

Sec. 17.163   Evidence of taxpayment of distilled spirits.

    (a) Shipments from distilled spirits plants. For each shipment of 
taxpaid spirits from the bonded premises of a distilled spirits plant, 
the manufacturer shall obtain the record of shipment prepared by the 
supplier under Sec. 19.780 of this chapter. This record shall be 
retained with the commercial invoice (if

[[Page 31423]]

the latter is a separate document) as evidence of taxpayment of the 
spirits. The record shall show the effective tax rate(s) (if other than 
the rate prescribed by 26 U.S.C. 5001) applicable to the shipment.
    (b) Purchases from wholesale and retail liquor dealers. 
Manufacturers shall obtain commercial invoices or other documentation 
pertaining to purchases of distilled spirits from wholesale and retail 
liquor dealers (including such dealership operations when conducted in 
conjunction with a distilled spirits plant). For spirits other than 
alcohol, grain spirits, neutral spirits, distilled gin, or straight 
whisky (as defined in the standards of identity prescribed by Sec. 5.22 
of this chapter), the manufacturer of nonbeverage products shall obtain 
evidence, from the producer or bottler of the spirits, as to the 
effective tax rate paid thereon.
    (c) Imported spirits. For imported spirits that were taxpaid 
through Customs, evidence of such taxpayment (such as Customs Forms 
7501 and 7505, receipted to indicate payment of tax, and the 
certificate of effective tax rate computation, if applicable) shall be 
secured from the importer and retained by the manufacturer.
    (d) Evidence of effective tax rate. If the evidence of effective 
tax rate, required by this section for distilled spirits products that 
may contain wine or flavors, is not obtained, drawback shall only be 
allowed based on the lowest effective tax rate possible for the kind of 
distilled spirits product used.

Sec. 17.164   Production record.

    (a) General. Each manufacturer shall keep a production record for 
each batch of intermediate product and for each batch of nonbeverage 
product. The production record shall be an original record made at the 
time of production by a person (or persons) having actual knowledge 
thereof. If any product is produced by a continuous process rather than 
by batches, the production record shall pertain to the total quantity 
of that product produced during each claim period.
    (b) Information to be shown. The record shall show the name and 
formula number of the product, the actual quantities of all ingredients 
used in the manufacture of the batch (including the proof or alcohol 
percentage by volume of all spirits), the date when eligible spirits 
were considered used (see Sec. 17.152), the effective tax rate 
applicable to those spirits (if other than the rate prescribed by 26 
U.S.C. 5001), and the quantity of product produced. The alcohol content 
of the product shall be shown if a test of alcohol content was made 
(see paragraph (e) of this section). Usage of eligible and ineligible 
spirits shall be shown separately. If spirits from Puerto Rico or the 
U.S. Virgin Islands, containing at least 92% rum, were used, the record 
shall indicate their place of origin. If rum was used, the record shall 
indicate whether it was from Puerto Rico, from the U.S. Virgin Islands, 
imported from other countries, or domestic. If spirits were recovered, 
the production record shall so indicate, and the record required by 
Sec. 17.168 shall be kept. If drawback is claimed on spirits consumed 
as an essential part of the manufacture of a nonbeverage product, which 
were not contained in that product at its completion, then the 
production record shall show the quantity of spirits so consumed in the 
manufacture of each batch.
    (c) Specificity of information. The production record shall refer 
to ingredients by the same names as are used for them in the product's 
formula. This includes formulas submitted to ATF and formulas contained 
in the publications listed in Sec. 17.132. Other names for the 
ingredients may be added in the production record, if necessary for the 
manufacturer's operations. Usage of ingredients (including spirits) may 
be shown in units of weight or volume.
    (d) Determining quantity of distilled spirits used. Each 
manufacturer shall accurately determine, by weight or volume, and 
record in the production records the quantity of all distilled spirits 
used. When the quantity used is determined by volume, adjustments shall 
be made if the temperature of the spirits is above or below 60 degrees 
Fahrenheit. A table for correction of volume of spirituous liquors to 
60 degrees Fahrenheit, Table 7 of the ``Gauging Manual,'' is available. 
See subpart E of part 30 of this chapter and Sec. 30.67. Losses after 
receipt due to leakage, spillage, evaporation, or other causes not 
essential to the manufacturing process shall be accurately recorded in 
the manufacturer's permanent records at the time such losses are 
determined.
    (e) Tests of alcohol content. At representative intervals, the 
manufacturer shall verify the alcohol content of nonbeverage products. 
The results of such tests shall be recorded.

Sec. 17.165   Receipt of raw ingredients.

    For raw ingredients destined to be used in nonbeverage or 
intermediate products, the manufacturer shall record, for each shipment 
received--
    (a) The date of receipt;
    (b) The quantity received; and
     (c) The identity of the supplier.

Sec. 17.166   Disposition of nonbeverage products.

    (a) Shipments. For each shipment of nonbeverage products, the 
manufacturer shall record--
    (1) The formula number of the product;
    (2) The date of shipment;
    (3) The quantity shipped; and
    (4) The identity of the consignee.
    (b) Other disposition. For other dispositions of nonbeverage 
products, the manufacturer shall record--
    (1) The type of disposition;
    (2) The date of disposition; and
    (3) The quantity of each product so disposed of.
    (c) Exception. The manufacturer need not keep the records required 
by paragraphs (a) and (b) of this section for any nonbeverage product 
which either contains less than 3 percent of distilled spirits by 
volume, or is sold by the producer directly to the consumer in retail 
quantities. However, when needed for protection of the revenue, the 
regional director (compliance) may at any time require the keeping of 
these records upon giving at least five days' notice to the 
manufacturer.

Sec. 17.167   Inventories.

    (a) Distilled spirits. The ``on hand'' figures reported in Part II 
of ATF Form 5154.2 shall be verified by physical inventories taken as 
of the end of each quarter in which nonbeverage products were 
manufactured for purposes of drawback. Spirits taxpaid at different 
effective tax rates shall be inventoried separately. The inventory 
record shall show the date inventory was taken, the person(s) by whom 
it was taken, subtotals for each product inventoried, and any gains or 
losses disclosed; and shall be retained with the manufacturer's 
records. The manufacturer shall explain in Part IV of the supporting 
data (Form 5154.2) any discrepancy between the amounts on hand as 
disclosed by physical inventory and the amounts indicated by the 
manufacturer's records. Any gain in eligible spirits disclosed by 
inventory requires an equivalent deduction from the claim with which 
the inventory is reported. Gains shall not be offset by known losses. 
If no claim is filed for a quarter (nor for any monthly period 
therein), then no physical inventory is required for that quarter.
    (b) Raw ingredients and nonbeverage products. When necessary for 
ensuring compliance with regulations and protection of the revenue, the 
regional director (compliance) may require a manufacturer to take 
physical inventories of finished nonbeverage products, and/or raw 
ingredients

[[Page 31424]]

intended for use in the manufacture of nonbeverage or intermediate 
products. The results of such inventories shall be recorded in the 
manufacturer's records. Any discrepancy between the amounts on hand as 
disclosed by physical inventory and such amounts as indicated by the 
manufacturer's records shall also be recorded with an explanation of 
its cause.

Sec. 17.168   Recovered spirits.

    (a) Each manufacturer intending to recover distilled spirits under 
the provisions of this part shall first notify the regional director 
(compliance). Any apparatus used to separate alcohol is subject to the 
registration requirements of 26 U.S.C. 5179 and subpart C of part 170 
of this chapter. Recovery operations shall only be conducted on the 
premises covered by the manufacturer's special tax stamp.
    (b) The manufacturer shall keep a record of the distilled spirits 
recovered and the subsequent use to which such spirits are put. The 
record shall show--
    (1) The date of recovery;
    (2) The commodity or process from which the spirits were recovered;
    (3) The amount in proof gallons, or by weight and proof (or alcohol 
percentage by volume) of distilled spirits recovered;
    (4) The amount in proof gallons, or by weight and proof (or alcohol 
percentage by volume) of recovered distilled spirits reused;
    (5) The commodity in which the recovered distilled spirits were 
reused; and
    (6) The date of reuse.
    (c) Whenever recovered spirits are destroyed (see Sec. 17.183), the 
record shall further show--
    (1) The reason for the destruction;
    (2) The date, time, location, and manner of destruction;
    (3) The number of proof gallons destroyed; and
    (4) The name of the individual who accomplished or supervised the 
destruction.

Sec. 17.169   Transfer of intermediate products.

    When intermediate products are transferred as permitted by 
Sec. 17.185(b), supporting records of such transfers shall be kept at 
the shipping and receiving plants, showing the date and quantity of 
each product transferred.

Sec. 17.170  Retention of records.

    Each manufacturer shall retain for a period of not less than 3 
years all records required by this part, a copy of all claims and 
supporting data filed in support thereof, all commercial invoices or 
other documents evidencing taxpayment or tax-determination of domestic 
spirits, all documents evidencing taxpayment of imported spirits, and 
all bills of lading received which pertain to shipments of spirits. In 
addition, a copy of each formula submitted on ATF Form 5154.1 shall be 
retained at each factory where the formula is used, for not less than 3 
years from the date of filing of the last claim for drawback under the 
formula. A copy of an approval to use an alternate method or procedure 
shall be retained as long as the manufacturer employs the method or 
procedure, and for 3 years thereafter. Further, the regional director 
(compliance) may require these records, forms, and documents to be 
retained for an additional period of not more than 3 years in any case 
where he or she deems such retention to be necessary or advisable for 
protection of the revenue.

Sec. 17.171  Inspection of records.

    All of the records, forms, and documents required to be retained by 
Sec. 17.170 shall be kept at the place covered by the special tax stamp 
and shall be readily available during the manufacturer's regular 
business hours for examination and copying by ATF officers. At the same 
time, any other books, papers, records or memoranda in the possession 
of the manufacturer, which have a bearing upon the matters required to 
be alleged in a claim for drawback, shall be available for inspection 
by ATF officers.

(Sec. 5133, 68A Stat. 623 (26 U.S.C. 5133); sec. 201, Pub. L. 85-
859, 72 Stat. 1348 (26 U.S.C. 5146)).

Subpart I--Miscellaneous Provisions

Sec. 17.181  Exportation of medicinal preparations and flavoring 
extracts.

    Medicinal preparations and flavoring extracts, approved for 
drawback under the provisions of this part, may be exported subject to 
19 U.S.C. 1313(d), which authorizes export drawback equal to the entire 
amount of internal revenue tax found to have been paid on the domestic 
alcohol used in the manufacture of such products. (Note: Export 
drawback is not allowed for imported alcohol under this provision of 
customs law.) Claims for such export drawback shall be filed in 
accordance with the applicable regulations of the U.S. Customs Service. 
Such claims may cover either the full rate of tax which has been paid 
on the alcohol, if no nonbeverage drawback has been claimed thereon, or 
else the remainder of the tax if nonbeverage drawback under 26 U.S.C. 
5134 has been or will be claimed.

Sec. 17.182  Drawback claims by druggists.

    Drawback of tax under 26 U.S.C. 5134 is allowable on taxpaid 
distilled spirits used in compounding prescriptions by druggists who 
have paid the special tax prescribed by 26 U.S.C. 5131. The 
prescriptions so compounded shall be shown in the supporting data by 
listing the first and last serial numbers thereof. The amount of 
taxpaid spirits used in each prescription need not be shown, but such 
prescriptions shall be made available for examination by ATF officers. 
If refills have been made of prescriptions received in a previous claim 
period, their serial numbers shall be recorded separately. Druggists 
claiming drawback as authorized by this section are subject to all the 
applicable requirements of this part, except those requiring the filing 
of quantitative formulas.

Sec. 17.183  Disposition of recovered alcohol and material from which 
alcohol can be recovered.

    (a) Recovered alcohol. Manufacturers of nonbeverage products shall 
not sell or transfer recovered spirits to any other premises without 
ATF authorization under Sec. 17.3. If recovered spirits are stored 
pending reuse, storage facilities shall be adequate to protect the 
revenue. If recovered spirits are destroyed, the record required by 
Sec. 17.168(c) must be kept. Spirits recovered from intermediate 
products may be destroyed without notice to ATF. Spirits recovered from 
nonbeverage products may be destroyed pursuant to a notice filed with 
the regional director (compliance) at least 12 days prior to the date 
of destruction. The notice shall state the reason for the destruction, 
the intended date of destruction, and the approximate quantity 
involved. The regional director (compliance) may impose specific 
conditions, including requiring that the destruction be witnessed by an 
ATF officer. Unless the manufacturer is otherwise advised by the 
regional director (compliance) before the date specified in the notice, 
the destruction may proceed as planned.
    (b) By-product material (general). By-product material from which 
alcohol can be recovered shall not be sold or transferred unless the 
alcohol has been removed or an approved substance has been added to 
prevent recovery of residual alcohol. Material from which alcohol can 
be recovered may also be destroyed on the manufacturer's premises by a 
suitable method. Except as provided in paragraph (c) of this section, 
prior written approval shall be obtained from the regional director 
(compliance) as to the adequacy, under this section, of any substance 
proposed

[[Page 31425]]

to be added to prevent recovery of alcohol, or of any proposed method 
of destruction.
    (c) Spent vanilla beans. Specific approval from the regional 
director (compliance) is not required when spent vanilla beans 
containing residual alcohol are destroyed on the manufacturer's 
premises by burning, or when they are removed from those premises after 
treatment with sufficient kerosene, mineral spirits, rubber hydrocarbon 
solvent, or gasoline to prevent recovery of residual alcohol.

Sec. 17.184  Distilled spirits container marks.

    All marks required by Part 19 of this chapter shall remain on 
containers of taxpaid distilled spirits until the contents are emptied. 
Whenever such a container is emptied, such marks shall be completely 
obliterated.

(Sec. 454, Pub. L. 98-369, 98 Stat. 820 (26 U.S.C. 5206(d)))

Sec. 17.185  Requirements for intermediate products and unfinished 
nonbeverage products.

    (a) General. Self-manufactured ingredients made with taxpaid 
spirits may be accounted for either as intermediate products or as 
unfinished nonbeverage products. The manufacturer may choose either 
method of accounting for such self-manufactured ingredients (see 
Sec. 17.127). However, the method selected determines the requirements 
that will apply to those ingredients, as prescribed in paragraphs (b) 
and (c) of this section.
    (b) Intermediate products. Intermediate products shall be used 
exclusively in the manufacture of nonbeverage products. Intermediate 
products may be accumulated and stored indefinitely and may be used in 
any nonbeverage product whose formula calls for such use. Intermediate 
products shall be manufactured by the same entity that manufactures the 
finished nonbeverage products. Intermediate products shall not be sold 
or transferred between separate and distinct entities. However, they 
may be transferred to another branch or plant of the same manufacturer, 
for use there in the manufacture of approved nonbeverage products. (See 
Sec. 17.169 for recordkeeping requirement.) For the purposes of this 
section, the phrase ``separate and distinct entities'' includes parent 
and subsidiary corporations, regardless of any corporate (or other) 
relationship, and even if the stock of both the manufacturing firm and 
the receiving firm is owned by the same persons.
    (c) Unfinished nonbeverage products. An unfinished nonbeverage 
product shall only be used in the particular nonbeverage product for 
which it was manufactured, and shall be entirely so used within the 
time limit stated in the approved ATF Form 5154.1. Spirits dissipated 
or recovered in the manufacture of unfinished nonbeverage products 
shall be regarded as having been dissipated or recovered in the 
manufacture of nonbeverage products. Spirits contained in such 
unfinished products shall be accounted for in the supporting data under 
Sec. 17.147 and inventoried under Sec. 17.167 as ``in process'' in 
nonbeverage products. Production of unfinished nonbeverage products 
shall be recorded as an integral part of the production records for the 
related nonbeverage products. Unfinished nonbeverage products shall not 
be transferred to other premises.

Sec. 17.186  Transfer of distilled spirits to other containers.

    A manufacturer may transfer taxpaid distilled spirits from the 
original package to other containers at any time for the purpose of 
facilitating the manufacture of products unfit for beverage use. 
Containers into which distilled spirits have been transferred under 
this section shall bear a label identifying their contents as taxpaid 
distilled spirits, and shall be marked with the serial number of the 
original package from which the spirits were withdrawn.

Sec. 17.187  Discontinuance of business.

    The manufacturer shall notify ATF when business is to be 
discontinued. Upon discontinuance of business, a manufacturer's entire 
stock of taxpaid distilled spirits on hand may be sold in a single sale 
without the necessity of qualifying as a wholesaler under part 1 of 
this chapter or paying special tax as a liquor dealer under part 194 of 
this chapter. The spirits likewise may be returned to the person from 
whom purchased, or they may be destroyed or given away.

PART 19--[AMENDED]

    Paragraph B. The regulations in 27 CFR part 19 are amended as 
follows:
    1. The authority citation for part 19 continues to read as follows:

    Authority: 19 U.S.C. 81c, 1311; 26 U.S.C. 5001, 5002, 5004-5006, 
5008, 5010, 5041, 5061, 5062, 5066, 5081, 5101, 5111-5113, 5142, 
5143, 5146, 5171-5173, 5175, 5176, 5178-5181, 5201-5204, 5206, 5207, 
5211-5215, 5221-5223, 5231, 5232, 5235, 5236, 5241-5243, 5271, 5273, 
5301, 5311-5313, 5362, 5370, 5373, 5501-5505, 5551-5555, 5559, 5561, 
5562, 5601, 5612, 5682, 6001, 6065, 6109, 6302, 6311, 6676, 6806, 
7011, 7510, 7805; 31 U.S.C. 9301, 9303, 9304, 9306.

    2. Part 19, subpart D, is amended to add Secs. 19.57-19.58 grouped 
under an undesignated center heading, to read as follows:
* * * * *

Subpart D--Administrative and Miscellaneous Provisions

Sec.

Activities Not Subject to This Part

19.57  Recovery and reuse of denatured spirits in manufacturing 
processes.
19.58  Use of taxpaid distilled spirits to manufacture products 
unfit for beverage use.
* * * * *

Subpart D--Administrative and Miscellaneous Provisions

Activities Not Subject to This Part

Sec. 19.57  Recovery and reuse of denatured spirits in manufacturing 
processes.

    The following persons are not, by reason of the activities listed 
below, subject to the provisions of this part, but they shall comply 
with the provisions of part 20 of this chapter relating to the use and 
recovery of spirits or denatured spirits:
    (a) Manufacturers who use denatured spirits, or articles or 
substances containing denatured spirits, in a process wherein any part 
or all of the spirits, including denatured spirits, are recovered.
    (b) Manufacturers who use denatured spirits in the production of 
chemicals which do not contain spirits but which are used on the permit 
premises in the manufacture of other chemicals resulting in spirits as 
a by-product.
    (c) Manufacturers who use chemicals or substances which do not 
contain spirits or denatured spirits (but which were manufactured with 
specially denatured spirits) in a process resulting in spirits as a by-
product.

(Sec 201, Pub. L. 85-859, 72 Stat. 1372, as amended (26 U.S.C. 
5273))

Sec. 19.58  Use of taxpaid distilled spirits to manufacture products 
unfit for beverage use.

    (a) General. Apothecaries, pharmacists, and manufacturers are not 
required to qualify as processors under 26 U.S.C. 5171 before 
manufacturing or compounding the following products, if the tax has 
been paid or determined on all of the distilled spirits contained 
therein:
    (1) Medicines, medicinal preparations, food products, flavors, 
flavoring extracts, and perfume, conforming to the standards for 
approval of nonbeverage drawback products found in Secs. 17.131-17.137 
of this chapter, whether or not drawback is

[[Page 31426]]

actually claimed on those products. Except as provided in paragraph (c) 
of this section, a formula need not be submitted if drawback is not 
desired.
    (2) Patented, patent, and proprietary medicines that are unfit for 
use for beverage purposes.
    (3) Toilet, medicinal, and antiseptic preparations and solutions 
that are unfit for use for beverage purposes.
    (4) Laboratory reagents, stains, and dyes that are unfit for use 
for beverage purposes.
    (5) Flavoring extracts, syrups, and concentrates that are unfit for 
use for beverage purposes.
    (b) Exceptions; products classed as beverages. Products specified 
under part 17 of this chapter as being fit for beverage use are 
alcoholic beverages. Bitters, patent medicines, and similar alcoholic 
preparations which are fit for beverage purposes, although held out as 
having certain medicinal properties, are also alcoholic beverages. Such 
products are required to be manufactured on the bonded premises of a 
distilled spirits plant, and are subject to the provisions of this 
part.
    (c) Formulas and samples; when required. On request of the 
Director, or when in doubt as to the classification of a product, the 
manufacturer shall submit to the Director the formula for and a sample 
of the product for examination to verify the manufacturer's claim of 
exemption from qualification requirements.
    (d) Change of formula; when required. If the regional director 
(compliance) finds at any time that any product manufactured under 
paragraph (a) of this section is being used for beverage purposes, or 
for mixing with beverage spirits other than by a processor, he or she 
shall notify the manufacturer to desist from manufacturing the product 
until the formula is changed to make the product not susceptible of 
beverage use and the change is approved by the Director. (However, the 
provisions of this paragraph shall not prohibit such products, which 
are unfit for beverage use, from being used in small quantities for 
flavoring drinks at the time of serving for immediate consumption.) 
Where, pursuant to notice, the manufacturer does not desist, or the 
formula is not so modified as to make the product unsusceptible of 
beverage use, the manufacturer shall immediately qualify as a 
processor.

(Sec. 805, Pub. L. 96-39, 93 Stat. 275, 278 (26 U.S.C. 5002, 5171))

Sec. 19.69  [Removed]

    3. Section 19.69 is removed.
    4. Section 19.780(c) (4) and (5) are revised to read as follows:

Sec. 19.780  Record of distilled spirits shipped to manufacturers of 
nonbeverage products.

* * * * *
    (c) * * *
    (4) Kind, proof, and quantity of distilled spirits in each 
container;
    (5) Number of containers of each size;
* * * * *

PART 70--[AMENDED]

    Paragraph C. The regulations in 27 CFR part 70 are amended as 
follows:
    1. The authority citation for part 70 is revised to read as 
follows:

    Authority: 5 U.S.C. 301 and 552; 26 U.S.C. 4181, 4182, 5146, 
5203, 5207, 5275, 5367, 5415, 5504, 5555, 5684(a), 5741, 5761(b), 
5802, 6020, 6021, 6064, 6102, 6155, 6159, 6201, 6203, 6204, 6301, 
6303, 6311, 6313, 6314, 6321, 6323, 6325, 6326, 6331-6343, 6401-
6404, 6407, 6416, 6423, 6501-6503, 6511, 6513, 6514, 6532, 6601, 
6602, 6611, 6621, 6622, 6651, 6653, 6656-6658, 6665, 6671, 6672, 
6701, 6723, 6801, 6862, 6863, 6901, 7011, 7101, 7102, 7121, 7122, 
7207, 7209, 7214, 7304, 7401, 7403, 7406, 7423, 7424, 7425, 7426, 
7429, 7430, 7432, 7502, 7503, 7505, 7506, 7513, 7601-7606, 7608-
7610, 7622, 7623, 7653, 7805.

    2. The concluding text of Sec. 70.321(a) is amended to read as 
follows:

Sec. 70.321  Registration of persons paying a special tax.

    (a) Persons required to register. * * *
* * * * *
    For provisions with respect to the registration of persons subject 
to the special tax imposed by section 5131, relating to the tax on 
persons claiming drawback on distilled spirits used in the manufacture 
of certain nonbeverage products, see section 5132 of the Internal 
Revenue Code and 27 CFR part 17 (Drawback on Taxpaid Distilled Spirits 
Used in Manufacturing Nonbeverage Products).
* * * * *

Sec. 70.411  [Amended]

    3. Section 70.411 is amended by removing paragraphs (c)(2)(v) and 
(c)(2)(vii), redesignating existing paragraph (c)(2)(vi) as paragraph 
(c)(2)(v), and by adding a new paragraph (c)(2)(vi) to read as follows:
* * * * *
    (c) * * *
    (2) * * *
    (vi) Floor stocks tax on alcoholic beverages and imported perfumes 
held for sale on January 1, 1991.
* * * * *
    4. Section 70.411(c)(17) is amended by replacing the words ``Part 
197'' with the words ``part 17''.
    5. Section 70.414(j) is revised to read as follows:

Sec. 70.414  Preparation and filing of claims.

* * * * *
    (j) Distilled spirits used in nonbeverage products. Procedural 
instructions in respect of claims for drawback of excise tax and claims 
for refund of special (occupational) tax, submitted by persons using 
distilled spirits in the manufacture of medicines, medicinal 
preparations, food products, flavors, flavoring extracts, or perfume, 
which are unfit for beverage purposes, are contained in part 17 of 
title 27 CFR.
* * * * *

PART 170--[AMENDED]

    Paragraph D. The regulations in 27 CFR part 170 are amended as 
follows:
    1. The authority citation for part 170 is revised to read as 
follows:

    Authority: 26 U.S.C. 5001, 5002, 5064, 5101, 5102, 5179, 5291, 
5301, 5362, 5601, 5615, 5687, 7805; 31 U.S.C. 9304, 9306.

Secs. 170.611-170.618  Subpart U [Removed and reserved]

    2. Subpart U is removed and reserved.

PART 194--[AMENDED]

     Paragraph E. The regulations in 27 CFR part 194 are amended as 
follows:
    1. The authority citation for part 194 is revised to read as 
follows:

    Authority: 26 U.S.C. 5001, 5002, 5111-5117, 5121-5124, 5142, 
5143, 5145, 5146, 5206, 5207, 5301, 5352, 5555, 5613, 5681, 5691, 
6001, 6011, 6061, 6065, 6071, 6091, 6109, 6151, 6311, 6314, 6402, 
6511, 6601, 6621, 6651, 6657, 7011, 7805.

    2. Section 194.33(b) is revised to read as follows:

Sec. 194.33  Sales of alcoholic compounds, preparations, or mixtures 
containing distilled spirits, wines, or beer.

* * * * *
    (b) Products unfit for beverage use. Products meeting the 
requirements for exemption from qualification under the provisions of 
Sec. 19.58 of this chapter shall be deemed to be unfit for beverage 
purposes for the purposes of this part.

Sec. 194.191  [Amended]

    3. Section 194.191(a) is amended by replacing the words ``Part 
170'' with the words ``Sec. 19.58''.

PART 197--[REMOVED]

    Paragraph F. Title 27 CFR part 197 is removed.

PART 250--[AMENDED]

    Paragraph G. The regulations in 27 CFR part 250 are amended as 
follows:
    1. The authority citation for part 250 continues to read as 
follows:

[[Page 31427]]

    Authority: 19 U.S.C. 81c; 26 U.S.C. 5001, 5007, 5008, 5010, 
5041, 5051, 5061, 5081, 5111, 5112, 5114, 5121, 5122, 5124, 5131-
5134, 5141, 5146, 5207, 5232, 5271, 5276, 5301, 5314, 5555, 6001, 
6301, 6302, 6804, 7101, 7102, 7651, 7652, 7805; 27 U.S.C. 203, 205; 
31 U.S.C. 9301, 9303, 9304, 9306.

Sec. 250.11  [Amended]

    2. The definition of ``Chief, Puerto Rico Operations'' in 
Sec. 250.11 is amended by replacing the words ``Room 329'' with the 
words ``Room 659''.
    3. The definition of ``Eligible article'' in Sec. 250.11 is amended 
by replacing the words ``flavor or flavoring extract'' with the words 
``flavor, flavoring extract or perfume''.

Sec. 250.51  [Amended]

    4. Paragraph (a) of Sec. 250.51 is amended by replacing the words 
``part 197'' with the words ``part 17''.
    5. Paragraph (c) of Sec. 250.51 is amended by replacing the words 
``5530.5 (1678)'' with the words ``5154.1 (formerly 1678)''.

Sec. 250.171  [Amended]

    6. The second sentence of Sec. 250.171 is amended by replacing the 
words ``part 197'' with the words ``part 17''.
    7. Section 250.172 is revised to read as follows:

Sec. 250.172  Bonds.

    (a) General. Persons bringing eligible articles into the United 
States from Puerto Rico and intending to file monthly claims for 
drawback under the provisions of this subpart shall obtain a bond on 
Form 5154.3. When the limit of liability under a bond given in less 
than the maximum amount has been reached, further drawback on monthly 
claims may be suspended until a strengthening or superseding bond in a 
sufficient amount has been furnished. For provisions relating to 
bonding requirements, subpart E of part 17 of this chapter is 
incorporated in this part, but references therein to a regional 
director (compliance) shall apply, for purposes of this part, to the 
Chief, Puerto Rico Operations.
    (b) Approval required. No person bringing eligible articles into 
the United States from Puerto Rico may file monthly claims for drawback 
under the provisions of this subpart until bond on Form 5154.3 has been 
approved by the Chief, Puerto Rico Operations. Bonds approved by a 
regional director (compliance) prior to the effective date of this 
provision shall remain in effect.
    8. In Sec. 250.173, the first sentence of paragraph (a), the 
introductory text of paragraph (c), and the first sentence of paragraph 
(d) are revised to read as follows:

Sec. 250.173  Claims for drawback.

    (a) General. Persons bringing eligible articles into the United 
States from Puerto Rico shall file claim for drawback on Form 2635 
(5620.8) with the Chief, Puerto Rico Operations. * * *
* * * * *
    (c) Supporting data. Each claim shall be accompanied by supporting 
data as specified in this paragraph. ATF Form 5154.2, Supporting Data 
for Nonbeverage Drawback Claims, may be used, or the claimant may use 
any suitable format that provides the following information:
* * * * *
    (d) Date of filing claim. Quarterly claims for drawback shall be 
filed with the Chief, Puerto Rico Operations, within the 6 months next 
succeeding the quarter in which the eligible products covered by the 
claim were brought into the United States. * * *

Sec. 250.221  [Amended]

    9. Paragraph (a) of Sec. 250.221 is amended by replacing the words 
``part 197'' with the words ``part 17''.
    10. Paragraph (c) of Sec. 250.221 is amended by replacing the words 
``5530.5 (1678)'' with the words ``5154.1 (formerly 1678)''.

Sec. 250.307  [Amended]

    11. The second sentence of Sec. 250.307 is amended by replacing the 
words ``Part 197'', wherever they occur, with the words ``part 17''.
    12. Section 250.308 is revised to read as follows:

Sec. 250.308  Bonds.

    (a) General. Persons bringing eligible articles into the United 
States from the Virgin Islands and intending to file monthly claims for 
drawback under the provisions of this subpart shall obtain a bond on 
Form 5154.3. When the limit of liability under a bond given in less 
than the maximum amount has been reached, further drawback on monthly 
claims may be suspended until a strengthening or superseding bond in a 
sufficient amount has been furnished. For provisions relating to 
bonding requirements, subpart E of part 17 of this chapter is 
incorporated in this part, but references therein to a regional 
director (compliance) shall apply, for purposes of this part, to the 
Chief, Puerto Rico Operations.
    (b) Approval required. No person bringing eligible articles into 
the United States from the Virgin Islands may file monthly claims for 
drawback under the provisions of this subpart until bond on Form 5154.3 
has been approved by the Chief, Puerto Rico Operations. Bonds approved 
by a regional director (compliance) prior to the effective date of this 
provision shall remain in effect.
    13. In Sec. 250.309, the first sentence of paragraph (a), the 
introductory text of paragraph (c), paragraph (c)(1) in its entirety, 
and the first sentence of paragraph (d) are revised to read as follows:

Sec. 250.309  Claims for drawback.

    (a) General. Persons bringing eligible articles into the United 
States from the Virgin Islands shall file claim for drawback on Form 
2635 (5620.8) with the Chief, Puerto Rico Operations. * * *
* * * * *
    (c) Supporting data. Each claim shall be accompanied by supporting 
data as specified in this paragraph. ATF Form 5154.2, Supporting Data 
for Nonbeverage Drawback Claims, may be used, or the claimant may use 
any suitable format that provides the following information:
    (1) The control number of the Special Tax Stamp and the tax year 
for which issued;
* * * * *
    (d) Date of filing claim. Quarterly claims for drawback shall be 
filed with the Chief, Puerto Rico Operations, within the 6 months next 
succeeding the quarter in which the eligible products covered by the 
claim were brought into the United States. * * *

    Signed: April 5, 1996.
Bradley A. Buckles,
Acting Director.
    Approved: May 9, 1996.
John P. Simpson,
Deputy Assistant Secretary, (Regulatory, Tariff and Trade Enforcement).
[FR Doc. 96-14881 Filed 6-19-96; 8:45 am]
BILLING CODE 4810-31-P

Complete official Federal Register PDF

FR Doc. 96-14636 List of Regulated Substances and Thresholds for Accidental Release Prevention; Final RuleStay of Effectiveness
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31730-31732]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14636]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 68

[FRL-5516-6]

List of Regulated Substances and Thresholds for Accidental 
Release Prevention; Final Rule--Stay of Effectiveness

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: On April 15, 1996, the Environmental Protection Agency (EPA) 
proposed several modifications to provisions of the rule listing 
regulated substances and establishing threshold quantities under 
section 112(r) of the Clean Air Act as amended (List Rule Amendments). 
The proposed List Rule Amendments, if promulgated in a final rule, 
would clarify or establish that part 68 does not apply to several types 
of processes and sources. In addition, EPA proposed, pursuant to Clean 
Air Act section 301(a)(1), 42 U.S.C. 7601(a)(1), to stay the 
effectiveness of provisions that would be affected by the proposed List 
Rule Amendments, for so long as necessary to take final action on the 
proposed List Rule Amendments. EPA received no adverse public comment 
on the short-term stay. Today EPA is amending part 68 to promulgate the 
stay, under which owners and operators of processes and sources that 
EPA has proposed not be subject to part 68 would not become subject to 
part 68 until EPA has determined whether to proceed with the List Rule 
Amendments. The effect of today's action will be to give owners and 
operators of sources affected by the proposed List Rule Amendments the 
same amount of time to achieve compliance with the requirements of part 
68 as owners and operators of other sources in the event that EPA does 
not proceed with the List Rule Amendments as proposed.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Vanessa Rodriguez, Chemical Engineer, 
Chemical Emergency Preparedness and Prevention Office, Environmental 
Protection Agency (5101), 401 M St. SW., Washington, DC 20460, (202) 
260-7913.

SUPPLEMENTARY INFORMATION:

I. Background and Discussion

    On April 15, 1996, EPA proposed amendments to regulations in 40 CFR 
part 68 that, inter alia, list regulated substances and establish 
threshold quantities for the accident prevention provisions under Clean 
Air Act section 112(r). 61 FR 16598. Readers should refer to that 
document for a complete discussion of the background of the rule 
affected. The amendments proposed in that document (``List Rule 
Amendments'') would, if promulgated, delete explosives from the list of 
regulated substances, modify threshold provisions to exclude flammable 
substances in gasoline and in naturally occurring hydrocarbon mixtures 
prior to entry into a processing unit or plant, modify the threshold 
provisions for other flammable mixtures, and clarify the definition of 
stationary source with respect to transportation, storage incident to 
transportation, and naturally occurring hydrocarbon reservoirs.
    On the same date, EPA proposed to stay provisions of part 68 that 
were affected by the proposed List Rule Amendments until such time as 
EPA takes final action on the proposed List Rule Amendments. 61 FR 
16606. EPA proposed a stay of 18 months because it believed such a 
period would be sufficient to take final action on the List Rule 
Amendments and believed that owners and operators affected by the List 
Rule Amendments should have the same certainty about whether they are 
subject to part 68 as owners and operators of other sources have when 
they begin their regulatory compliance planning. In general, owners and 
operators of sources subject to the ``Risk Management Program'' final 
rule promulgated elsewhere in today's Federal Register, have three 
years from today to achieve compliance with part 68.

[[Page 31731]]

    EPA received seven comment letters on the proposed stay; all 
generally supported EPA's action. The Agency's response to comments is 
contained below. Three commenters suggested that EPA should promulgate 
a stay for so long as it takes the Agency to take final action on the 
List Rule Amendments rather than for a certain (18 month) time period. 
The 18 month time period was selected to be consistent with the time 
period provided for final action on amendments discussed in the 
settlement of litigation concerning the List Rule. EPA believes this 
time will be sufficient to take any necessary action. Another commenter 
expressed concern that the stay would not affect statutory deadlines 
for seeking judicial review of the final Risk Management Program rule. 
EPA has not taken final action on the Risk Management Program rule's 
applicability to stationary sources, mixtures containing regulated 
flammable substances, and regulated explosive substances that are 
subject to today's stay. In the event that the Agency does not 
promulgate the List Rule Amendments, the Agency intends to take final 
action on applying the Risk Management Program to the sources, 
mixtures, and substances to be regulated. In the absence of final 
action on the Risk Management Program rule as it applies to these 
sources, mixtures, and substances, a petition seeking review of that 
rule would be premature.
    Under the provisions of section 307(b)(1) of the Clean Air Act, a 
petition for judicial review of this stay may only be filed in the 
United States Court of Appeals for District of Columbia Circuit within 
60 days of today's publication of this action.

II. Required Analyses

A. E.O. 12866

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), the 
Agency must judge whether the regulatory action is ``significant,'' and 
therefore subject to Office of Management and Budget (OMB) review and 
the requirements of the Executive Order. The Order defines a 
``significant regulatory action'' as one that is likely to result in a 
rule that may:
    (1) Have an annual effect on the economy of $100 million or more or 
adversely affect in a material way the economy, a sector of the 
economy, productivity, jobs, the environment, public health or safety, 
or state, local, or tribal government or communities;
    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.
    It has been determined this final rule is not a ``significant 
regulatory action'' under the terms of Executive Order 12866 and 
therefore is not subject to OMB review.

B. Regulatory Flexibility Act

    In accordance with the Regulatory Flexibility Act of 1980, Federal 
agencies must evaluate the effects of this final rule on small entities 
and examine alternatives that may reduce these effects. EPA has 
examined this final rule's potential effects on small entities as 
required by the Regulatory Flexibility Act. It has determined that this 
rule will have no adverse effect on small entities because it defers 
the need for stationary sources to comply with current rule provisions 
that EPA has proposed to amend; the amendments, if adopted, likely 
would reduce the number of stationary sources subject to the accidental 
release prevention requirements. Therefore, I certify that today's 
final stay of effectiveness rule will not have a significant economic 
effect on a substantial number of small entities.

C. Paperwork Reduction Act

    This final rule does not include any information collection 
requirements for OMB to review under the provisions of the Paperwork 
Reduction Act of 1980, 44 U.S.C. 3501 et seq.

D. Unfunded Mandates

    Under section 202 of the Unfunded Mandates Reform Act of 1995, 
signed into law on March 22, 1995, EPA must prepare a statement to 
accompany any rule where the estimated costs to State, local, or tribal 
governments in the aggregate, or to the private sector, will be $100 
million or more in any one year. Under section 205, EPA must select the 
most cost-effective and least burdensome alternative that achieves the 
objective of the rule and is consistent with statutory requirements. 
Section 203 requires EPA to establish a plan for informing and advising 
any small governments that may be significantly impacted by the rule.
    EPA has estimated that this rule does not include a Federal mandate 
that may result in estimated costs of $100 million or more to either 
State, local, or tribal governments in the aggregate, or to the private 
sector.

E. Submission to Congress and the General Accounting Office

    Under section 801(a)(1)(A) of the Administrative Procedures Act 
(APA) as amended by the Small Business Regulatory Enforcement Fairness 
Act of 1996, EPA submitted a report containing this rule and other 
required information to the U.S. Senate, the U.S. House of 
Representatives and the Comptroller General of the General Accounting 
Office prior to publication of the rule in today's Federal Register. 
This rule is not a ``major rule'' as defined by section 804(2) of the 
APA as amended.

List of Subjects in 40 CFR Part 68

    Environmental protection, Chemicals, Chemical accident prevention, 
Clean Air Act, Extremely hazardous substances, Intergovernmental 
relations, Hazardous substances, Reporting and recordkeeping 
requirements.

    Dated: May 24, 1996.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, Title 40, Chapter I, 
Subchapter C, Part 68 of the Code of Federal Regulations is amended to 
read as follows:

PART 68--ACCIDENTAL RELEASE PREVENTION PROVISIONS

    1. The authority citation for Part 68 continues to read as follows:

    Authority: 42 U.S.C. 7412(r), 7601.

    2. In Subpart A, Sec. 68.2 is added to read as follows:

Sec. 68.2  Stayed Provisions.

    (a) Notwithstanding any other provision of this part, the 
effectiveness of the following provisions is stayed from March 2, 1994 
to December 22, 1997.
    (1) In Sec. 68.3, the definition of ``stationary source,'' to the 
extent that such definition includes naturally occurring hydrocarbon 
reservoirs or transportation subject to oversight or regulation under a 
state natural gas or hazardous liquid program for which the state has 
in effect a certification to DOT under 49 U.S.C. 60105;
    (2) Section 68.115(b)(2) of this part, to the extent that such 
provision requires an owner or operator to treat as a regulated 
flammable substance:
    (i) Gasoline, when in distribution or related storage for use as 
fuel for internal combustion engines;
    (ii) Naturally occurring hydrocarbon mixtures prior to entry into a 
petroleum refining process unit or a natural gas processing plant. 
Naturally occurring hydrocarbon mixtures include any of

[[Page 31732]]

the following: condensate, crude oil, field gas, and produced water, 
each as defined in paragraph (b) of this section;
    (iii) Other mixtures that contain a regulated flammable substance 
and that do not have a National Fire Protection Association 
flammability hazard rating of 4, the definition of which is in the NFPA 
704, Standard System for the Identification of the Fire Hazards of 
Materials, National Fire Protection Association, Quincy, MA, 1990, 
available from the National Fire Protection Association, 1 Batterymarch 
Park, Quincy, MA 02269-9101; and
    (3) Section 68.130(a).
    (b) From March 2, 1994 to December 22, 1997, the following 
definitions shall apply to the stayed provisions described in paragraph 
(a) of this section:
    Condensate means hydrocarbon liquid separated from natural gas that 
condenses because of changes in temperature, pressure, or both, and 
remains liquid at standard conditions.
    Crude oil means any naturally occurring, unrefined petroleum 
liquid.
    Field gas means gas extracted from a production well before the gas 
enters a natural gas processing plant.
    Natural gas processing plant means any processing site engaged in 
the extraction of natural gas liquids from field gas, fractionation of 
natural gas liquids to natural gas products, or both. A separator, 
dehydration unit, heater treater, sweetening unit, compressor, or 
similar equipment shall not be considered a ``processing site'' unless 
such equipment is physically located within a natural gas processing 
plant (gas plant) site.
    Petroleum refining process unit means a process unit used in an 
establishment primarily engaged in petroleum refining as defined in the 
Standard Industrial Classification code for petroleum refining (2911) 
and used for the following: Producing transportation fuels (such as 
gasoline, diesel fuels, and jet fuels), heating fuels (such as 
kerosene, fuel gas distillate, and fuel oils), or lubricants; 
separating petroleum; or separating, cracking, reacting, or reforming 
intermediate petroleum streams. Examples of such units include, but are 
not limited to, petroleum based solvent units, alkylation units, 
catalytic hydrotreating, catalytic hydrorefining, catalytic 
hydrocracking, catalytic reforming, catalytic cracking, crude 
distillation, lube oil processing, hydrogen production, isomerization, 
polymerization, thermal processes, and blending, sweetening, and 
treating processes. Petroleum refining process units include sulfur 
plants.
    Produced water means water extracted from the earth from an oil or 
natural gas production well, or that is separated from oil or natural 
gas after extraction.

[FR Doc. 96-14636 Filed 6-19-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31668-31730]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14597]

[[Page 31667]]

_______________________________________________________________________

Part III

Environmental Protection Agency

_______________________________________________________________________

40 CFR Part 68

Accidental Release Prevention Requirements: Risk Management Programs 
Under the Clean Air Act, Section 112(r)(7); List of Regulated 
Substances and Thresholds for Accidental Release Prevention, Stay of 
Effectiveness; and Accidental Release Prevention Requirements: Risk 
Management Programs Under Section 112(r)(7) of the Clean Air Act as 
Amended, Guidelines; Final Rules and Notice

Federal Register / Vol. 61, No. 120 / Thursday, June 20, 1996 / Rules 
and Regulations

[[Page 31668]]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 68

[FRL-5516-5]
RIN 2050-AD26

Accidental Release Prevention Requirements: Risk Management 
Programs Under Clean Air Act Section 112(r)(7)

AGENCY: Environmental Protection Agency.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Clean Air Act requires EPA to promulgate regulations to 
prevent accidental releases of regulated substances and reduce the 
severity of those releases that do occur. EPA is promulgating rules 
that apply to all stationary sources with processes that contain more 
than a threshold quantity of a regulated substance. Processes will be 
divided into three categories based on: the potential for offsite 
consequences associated with a worst-case accidental release; accident 
history; or compliance with the prevention requirements under OSHA's 
Process Safety Management Standard. Processes that have no potential 
impact on the public in the case of an accidental release will have 
minimal requirements. For other processes, sources will implement a 
risk management program that includes more detailed requirements for 
hazard assessment, prevention, and emergency response. Processes in 
industry categories with a history of accidental releases and processes 
already complying with OSHA's Process Safety Management Standard will 
be subject to a prevention program that is identical to parallel 
elements of the OSHA Standard. All other processes will be subject to 
streamlined prevention requirements. All sources must prepare a risk 
management plan based on the risk management programs established at 
the source. The source must submit the plan to a central point 
specified by EPA; the plan will be available to state and local 
governments and the public. These regulations will encourage sources to 
reduce the probability of accidental releases of substances that have 
the potential to cause immediate harm to public health and the 
environment and will stimulate the dialogue between industry and the 
public to improve accident prevention and emergency response practices.

DATES: The rule is effective August 19, 1996.

ADDRESSES: Supporting material used in developing the proposed rule, 
supplemental notice, and final rule is contained in Docket No. A-91-73. 
The docket is available for public inspection and copying between 8:00 
a.m. and 5:30 p.m., Monday through Friday (except government holidays) 
at Room 1500, 401 M St. SW, Washington, DC 20460. A reasonable fee may 
charged for copying.

FOR FURTHER INFORMATION CONTACT: Craig Matthiessen at (202) 260-8600, 
Chemical Emergency Preparedness and Prevention Office, U.S. 
Environmental Protection Agency, 401 M St. SW, Washington, DC 20460, or 
the Emergency Planning and Community Right-to-Know Hotline at 1-800-
424-9346 (in the Washington, DC, metropolitan area, (703) 412-9810).

SUPPLEMENTARY INFORMATION: Judicial Review. Accidental Release 
Prevention Requirements: Risk Management Programs Under Clean Air Act 
Section 112(r)(7) were proposed in the Federal Register on October 20, 
1993 (58 FR 54190). A supplemental notice was issued on March 13, 1995 
(60 FR 13526). This Federal Register action announces the EPA's final 
decisions on the rule. Under section 307(b)(1) of the Act, judicial 
review of the Accidental Release Prevention Requirements: Risk 
Management Programs is available only by the petition for review in the 
U.S. Court of Appeals for the District of Columbia Circuit within 60 
days of today's publication of this final rule. Under section 307(b)(2) 
of the Act, the requirements that are the subject of today's notice may 
not be challenged later in civil or criminal proceedings brought by the 
EPA to enforce these requirements.

Regulated Entities

    Entities potentially regulated by this action are those stationary 
sources that have more than a threshold quantity of a regulated 
substance in a process. Regulated categories and entities include:

------------------------------------------------------------------------
             Category                  Examples of regulated entities   
------------------------------------------------------------------------
Chemical Manufacturers............  Industrial organics & inorganics,   
                                     paints, pharmaceuticals, adhesives,
                                     sealants, fibers                   
Petrochemical.....................  Refineries, industrial gases,       
                                     plastics & resins, synthetic rubber
Other Manufacturing...............  Electronics, semiconductors, paper, 
                                     fabricated metals, industrial      
                                     machinery, furniture, textiles     
Agriculture.......................  Fertilzers, pesticides              
Public Sources....................  Drinking and waste water treatment  
                                     works                              
Utilities.........................  Electric and Gas Utilities          
Others............................  Food and cold storage, propane      
                                     retail, warehousing and wholesalers
Federal Sources...................  Military and energy installations   
------------------------------------------------------------------------

    This table is not intended to be exhaustive, but rather provides a 
guide for readers regarding entities likely to be regulated by this 
action. This table lists the types of entities that EPA is now aware 
could potentially be regulated by this action. Other types of entities 
not listed in the table could also be regulated. To determine whether a 
stationary source is regulated by this action, carefully examine the 
provisions associated with the list of substances and thresholds under 
Sec. 68.130 (59 FR 4478), the proposed modifications (61 FR 16598, 
April 15, 1996) and the stay of implementation of the affected 
provisions until the proposed modifications are final published 
elsewhere in today's Federal Register, and the applicability criteria 
in Sec. 68.10 of today's rule. If you have questions regarding the 
applicability of this action to a particular entity, consult the person 
listed in the preceding FOR FURTHER INFORMATION CONTACT section.
    The following outline is provided to aid in reading this preamble:

I. Introduction and Background
    A. Statutory Authority
    B. Background
II. Discussion of Final Rule
    A. Applicability
    B. Program Criteria and Requirements
    C. Hazard Assessment
    D. Prevention Programs
    E. Emergency Response
    F. Risk Management Plan (RMP)
    G. Air Permitting
    H. Other Issues
III. Discussion of Comments
    A. Tiering
    1. Rationale
    2. Program 1 vs. Program 2 and Program 3 Criteria

[[Page 31669]]

    a. Potential for Offsite Impact
    b. Accident History
    c. Other
    3. Program 2 vs. Program 3 Criteria
    a. Number of Employees
    b. SIC Code
    c. Site-specific, Risk-based Criteria
    d. Accident History
    e. Other
    4. Program 1 Requirements
    a. Certification of No Environmental Impact
    b. Signs
    c. Emergency Response Program
    d. Other
    5. Program 2 Requirements
    a. Streamlined Program
    b. Other Regulations
    c. Emergency Response Program
    B. Offsite Consequence Analysis
    1. Worst-Case Release Scenario
    2. Mitigation Systems
    a. Worst-Case Release Scenario
    b. Alternative Scenarios
    3. Populations Affected
    4. Number of Scenarios
    5. Technical Guidance
    6. Modeling Parameters
    a. Endpoints
    b. Meteorology
    C. Consideration of Environmental Impact
    1. Inclusion of Environmental Impacts
    2. Environments to be Considered
    3. Level of Analysis Required
    D. Program 3 Consistency with OSHA PSM Standard
    1. Prevention Program
    2. Enforcement
    3. Exemptions
    E. Relationship to Air Permits
    1. General Relationship between the Part 68 and Part 70 programs
    2. Impact of EPA's Proposal on Air Permitting Programs
    3. Part 68 as an ``Applicable Requirement'' under Part 70
    4. Role of the Air Permitting Authority
    5. Air Permit Application Contents
    6. Air Permit Contents
    7. Completeness Review
    8. Interaction of the Implementing Agency and the Permitting 
Authority
    9. Designated Agency
    10. Reopening Air Permits to Incorporate Section 112(r) 
Requirements
    11. Use of Air Funds
    12. Other Issues
    F. General Definitions
    1. Significant Accidental Release
    2. Stationary Source
    3. Process
    4. Offsite
    5. Other Definitions
    G. Risk Management Plan (RMP)
    1. Level of Detail
    2. RMP Content
    3. Submission
    4. Other Issues
    H. Prevention Program
    I. Accident History
    J. Emergency Response Program
    K. Registration
    L. Model Risk Management Programs
    M. Implementing Agency Audits
    N. Public Participation
    O. Inherently Safer Technologies
    P. Coverage by Other Regulations
    1. General Issues
    2. DOT Transportation Regulations
    3. Other EPA Regulations
    4. Other Federal Regulations
    5. State and Local Regulations
    Q. Industry-Specific Issues
    1. Oil and Gas Facilities
    2. Retail Facilities
    a. Propane Retailers
    b. Ammonia Retailers
    3. Refrigeration Systems
    4. Other Operations
    R. Implementing Agency Delegation
    S. Accident Reporting
    T. Other Issues
    1. OSHA VPP
    2. Qualified Third Party
    3. Documentation
IV. Section-by-Section Analysis of the Rule
V. Required Analyses
    A. E.O. 12866
    B. Regulatory Flexibility Act
    C. Unfunded Mandate Reform Act
    D. Paperwork Reduction Act
    E. Submission to Congress and the General Accounting Office

I. Introduction and Background

A. Statutory Authority

    This rule is promulgated under sections 112(r), 301(a)(1), Title V 
of the Clean Air Act (CAA) as amended (42 U.S.C. 7412(r), 7601(a)(1), 
7661-7661f).

B. Background

    The CAA Amendments of 1990 amend section 112 and add paragraph (r). 
The intent of section 112(r) is to prevent accidental releases to the 
air and mitigate the consequences of such releases by focusing 
prevention measures on chemicals that pose the greatest risk to the 
public and the environment. Section 112(r)(3) mandates that EPA 
promulgate a list of regulated substances, with threshold quantities; 
this list defines the stationary sources that will be subject to 
accident prevention regulations mandated by section 112(r)(7). EPA 
promulgated its list of substances on January 31, 1994 (59 FR 4478) 
(``List Rule'').
    As noted elsewhere in today's Federal Register, EPA has stayed 
certain provisions of part 68 that were promulgated as part of the List 
Rule. The stayed provisions are being addressed in amendments to the 
List Rule, which were proposed in 61 FR 16598 (April 15, 1996). 
Therefore, EPA has not taken final action on provisions of the Risk 
Management Program rule that apply to regulated substances, mixtures, 
and stationary sources addressed by the stayed provisions. Final action 
will be deferred until EPA takes final action on the proposed 
amendments to the List Rule.
    Section 112(r)(7) mandates that EPA promulgate regulations and 
develop guidance to prevent, detect, and respond to accidental 
releases. Stationary sources covered by these regulations must develop 
and implement a risk management program that includes a hazard 
assessment, a prevention program, and an emergency response program. 
The risk management program must be described in a risk management plan 
(RMP) that must be registered with EPA, submitted to state and local 
authorities, and made available to the public. On October 20, 1993, EPA 
published a Notice of Proposed Rulemaking (NPRM) for the section 
112(r)(7) regulations (58 FR 54190). (For a summary of the statutory 
requirements of section 112(r) and related statutory provisions, see 
the October 20, 1993, NPRM).
    Following publication of the proposed rule, EPA held four public 
hearings and received approximately 770 written comments. Because of 
these comments, EPA issued a supplemental notice of proposed rulemaking 
(SNPRM) on March 13, 1995 (60 FR 13526) for comment on: approaches for 
setting different requirements for sources that pose different levels 
of hazard (tiering); worst-case releases and other hazard assessment 
issues; accident information reporting; public participation; 
inherently safer approaches; and implementation and integration of 
section 112(r) with state programs, particularly state air permitting 
programs. EPA held a public hearing on March 31, 1995, in Washington, 
DC, and received more than 280 written comments. Today's rule reflects 
EPA's consideration of all comments; major issues raised by commenters 
and EPA's response are briefly discussed in Section III of this 
preamble. A summary of all comments submitted and EPA's response to 
them is available in the Docket (see ADDRESSES).
    EPA has proposed to delist explosives from Sec. 68.130. 
Consequently, explosives are not addressed in this rule. EPA had also 
requested at the time of the final List Rule comments on whether 
flammable substances, when used as fuel, posed a lesser intrinsic 
hazard than the same substance handled otherwise (59 FR 4500, January 
31, 1994). The comments submitted lacked data that would justify a 
lesser level of hazard consideration for flammable fuels; hence, the 
Agency will not adopt a fuel use exemption for purposes of threshold 
quantity determination.
    With today's rule, EPA continues the philosophy that the Agency 
embraced in implementing the Emergency Planning and Community Right-to-
Know Act of

[[Page 31670]]

1986 (EPCRA). Specifically, EPA recognizes that regulatory 
requirements, by themselves, will not guarantee safety. Instead, EPA 
believes that information about hazards in a community can and should 
lead public officials and the general public to work with industry to 
prevent accidents. For example, today's rule requires covered sources 
to provide information about possible worst-case scenarios. EPA intends 
that officials and the public use this information to understand the 
chemical hazards in the community and then engage in a dialogue with 
industry to reduce risk. In this way, accident prevention is focused 
primarily at the local level where the risk is found. Further, today's 
rule builds on existing programs and standards. For example, EPA has 
coordinated with Occupational Safety and Health Administration (OSHA) 
and the Department of Transportation (DOT) in developing this 
regulation. To the extent possible, covered sources will not face 
inconsistent requirements under these agencies' rules. EPA is 
encouraging sources to use existing emergency response programs, rather 
than develop a separate and duplicative program under this rule. In 
addition, today's rule scales requirements based on the potential risk 
posed by a source and the steps needed to address the risk, rather than 
imposing identical requirements on all sources.
    To accommodate the concerns of small businesses, EPA is providing 
guidance with reference tables that covered sources can use to model 
the offsite consequences of a release. EPA is providing a model RMP 
guidance for the ammonia refrigeration industry, and will develop 
similar guidance for propane handlers and drinking water systems. As 
today's rule is implemented, EPA hopes that other industry sectors will 
work with EPA to develop model RMPs for other processes, thereby 
reducing costs for individual sources. Finally, today's rule requires 
industry to submit RMPs centrally in a format and method to be 
determined by EPA. Working with stakeholders, EPA will develop 
mechanisms to allow industry to use appropriate electronic technology 
to register with EPA and submit RMPs. In turn, all interested parties 
will be able to access electronically the data in RMPs. This method of 
submission and access avoids a potentially significant amount of 
paperwork for all involved parties and promotes uniformity. Users will 
be able to develop databases for specific purposes and compare RMPs for 
various sites across the country. In turn, industries' use of the data 
will promote continuous improvement, for example, through new safety 
technologies. As the method for submitting RMPs is developed, EPA 
invites the participation of all stakeholders, including industry, 
state and local governments, local emergency planning committees, 
environmental groups, and the general public.

II. Discussion of Final Rule

A. Applicability

    The owner or operator of a stationary source that has more than a 
threshold quantity of a regulated substance in a process must comply 
with these requirements no later than June 21, 1999; three years after 
the date on which a regulated substance is first listed under 
Sec. 68.130; or the date on which a regulated substance is first 
present in more than a threshold quantity in a process, whichever is 
later.

B. Program Criteria and Requirements

    Under today's rule, processes subject to these requirements are 
divided into three tiers, labeled Programs 1, 2, and 3. EPA has adopted 
the term ``Program'' to replace the term ``Tier'' found in the SNPRM to 
avoid confusion with Tier I and Tier II forms submitted under EPCRA, 
also known as Title III of the Superfund Amendments and Reauthorization 
Act of 1986 (SARA Title III). Eligibility for any given Program is 
based on process criteria so that classification of one process in a 
Program does not influence the classification of other processes at the 
source. For example, if a process meets Program 1 criteria, the source 
need only satisfy Program 1 requirements for that process, even if 
other processes at the source are subject to Program 2 or Program 3. A 
source, therefore, could have processes in one or more of the three 
Programs.
    Program 1 is available to any process that has not had an 
accidental release with offsite consequences in the five years prior to 
the submission date of the RMP and has no public receptors within the 
distance to a specified toxic or flammable endpoint associated with a 
worst-case release scenario. Program 3 applies to processes in Standard 
Industrial Classification (SIC) codes 2611 (pulp mills), 2812 (chlor-
alkali), 2819 (industrial inorganics), 2821 (plastics and resins), 2865 
(cyclic crudes), 2869 (industrial organics), 2873 (nitrogen 
fertilizers), 2879 (agricultural chemicals), and 2911 (petroleum 
refineries). Program 3 also applies to all processes subject to the 
OSHA Process Safety Management (PSM) standard (29 CFR 1910.119), unless 
the process is eligible for Program 1. Owners or operators will need to 
determine individual SIC codes for each covered process to determine 
whether Program 3 applies. All other covered processes must satisfy 
Program 2 requirements. Program requirements and differences are 
illustrated on Tables 1 and 2:

                  Table 1--Program Eligibility Criteria                 
------------------------------------------------------------------------
          Program 1                 Program 2             Program 3     
------------------------------------------------------------------------
No offsite accident history.    ..................  Process is subject  
                                                     to OSHA PSM.       
No public receptors in worst- The process is not    Process is in SIC   
 case circle.                  eligible for          code 2611, 2812,   
                               Program 1 or 3.       2819, 2821, 2865,  
                                                     2869, 2873, 2879,  
                                                     or 2911.           
Emergency response              ..................                      
 coordinated with local                                                 
 responders.                                                            
------------------------------------------------------------------------

               Table 2--Comparison of Program Requirements              
------------------------------------------------------------------------
          Program 1                 Program 2             Program 3     
------------------------------------------------------------------------
Hazard Assessment:                                                      
Worst-case analysis.........  Worst-case analysis.  Worst-case analysis.
                              Alternative releases  Alternative         
                                                     releases.          
5-year accident history.....  5-year accident       5-year accident     
                               history.              history.           
Management Program:                                                     
                              Document management   Document management 
                               system.               system.            

[[Page 31671]]

                                                                        
Prevention Program:                                                     
Certify no additional steps   Safety Information..  Process Safety      
 needed.                                             Information.       
                              Hazard Review.......  Process Hazard      
                                                     Analysis.          
                              Operating Procedures  Operating           
                                                     Procedures.        
                              Training............  Training.           
                              Maintenance.........  Mechanical          
                                                     Integrity.         
                              Incident              Incident            
                               Investigation.        Investigation.     
                              Compliance Audit....  Compliance Audit.   
                                ..................  Management of       
                                                     Change.            
                                ..................  Pre-startup Review. 
                                ..................  Contractors.        
                                ..................  Employee            
                                                     Participation.     
                                ..................  Hot Work Permits.   
Emergency Response Program:                                             
Coordinate with local         Develop plan and      Develop plan and    
 responders.                   program.              program.           
Risk Management Plan                                                    
 Contents:                                                              
Executive Summary...........  Executive Summary...  Executive Summary   
Registration................  Registration........  Registration.       
Worst-case data.............  Worst-case data.....  Worst-case data.    
5-year accident history.....  Alternative release   Alternative release 
                               data.                 data.              
Certification...............  5-year accident       5-year accident     
                               history.              history.           
                              Prevention program    Prevention program  
                               data.                 data.              
                              Emergency response    Emergency response  
                               data.                 data.              
                              Certification.......  Certification.      
------------------------------------------------------------------------

    The owner or operator of a covered process must: (1) prepare and 
submit a single risk management plan (RMP), including registration that 
covers all affected processes and chemicals; (2) conduct a worst-case 
release scenario analysis, review accident history, ensure emergency 
response procedures are coordinated with community response 
organizations to determine eligibility for Program 1 and, if eligible, 
document the worst case and complete a Program 1 certification for the 
RMP; (3) conduct a hazard assessment, document a management system, 
implement a more extensive, but still streamlined prevention program, 
and implement an emergency response program for Program 2 processes; 
and (4) conduct a hazard assessment, document a management system, 
implement a prevention program that is fundamentally identical to the 
OSHA PSM Standard, and implement an emergency response program for 
Program 3 processes.
    Measures taken by sources to comply with OSHA PSM for any process 
that meets OSHA's PSM standard are sufficient to comply with the 
prevention program requirements of all three Programs. EPA will retain 
its authority to enforce the prevention program requirements and the 
general duty requirements of CAA Section 112(r)(1). EPA and OSHA are 
working closely to coordinate interpretation and enforcement of PSM and 
accident prevention programs. EPA will also work with state and local 
agencies to coordinate oversight of worker and public safety and 
environmental protection programs.

C. Hazard Assessment

    EPA has adopted the worst-case definition proposed in the SNPRM. 
For all substances, the worst-case release scenario will be defined as 
the release of the largest quantity of a regulated substance from a 
vessel or process line failure, including administrative controls and 
passive mitigation that limit the total quantity involved or the 
release rate. For most gases, the worst-case release scenario assumes 
that the quantity is released in 10 minutes. For liquids, the scenario 
assumes an instantaneous spill; the release rate to the air is the 
volatilization rate from a pool 1 cm deep unless passive mitigation 
systems contain the substance in a smaller area. For flammables, the 
worst case assumes an instantaneous release and a vapor cloud 
explosion.
    For the final rule, EPA has adopted the term ``alternative release 
scenarios'' to replace the term ``other more likely scenarios'' found 
in the NPRM and SNPRM. The non-worst-case accidental releases for the 
hazard assessment portion of the risk management plan were presumed 
``more likely to occur'' and ``more realistic'' than the worst case. 
EPA believes sources should have flexibility to select non-worst-case 
scenarios that are the most useful for communication with the public 
and first responders and for emergency response preparedness and 
planning. Catastrophic accidental releases are typically rare events; 
the words ``more likely'' suggests certainty of occurrence. 
Consequently, the scenarios other than worst case provided in the 
hazard assessment are called alternative release scenarios. For 
alternative scenarios, sources may consider the effects of both passive 
and active mitigation systems.
    One worst-case release scenario will be defined to represent all 
toxics, and one worst-case release scenario will be defined to 
represent all flammables held above the threshold at the source. 
Additional worst-case release scenario(s) must be analyzed and reported 
if such a release from another covered process at the source 
potentially affects public receptors that would not be potentially 
affected by the first scenario. EPA recognizes that this approach may 
be problematic for some sources such as batch processors and warehouses 
where use of listed substances or inventory may vary considerably 
within an RMP reporting period. EPA suggests that owners or operators 
of such processes develop a worst-case scenario for future chemical use 
and inventory based on past practices to minimize the need for frequent 
revision of their worst-case scenario. For alternative release 
scenarios, one scenario is required for each toxic substance and one to 
represent all flammable substances held in covered processes at the 
source.
    An endpoint is needed for the offsite consequence analysis. 
Appendix A of today's rule lists the endpoints for toxic substances 
that must be used in worst-

[[Page 31672]]

case and alternative scenario assessment. The endpoint for a toxic 
substance is its Emergency Response Planning Guideline level 2 (ERPG-2) 
developed by the American Industrial Hygiene Association (AIHA). If a 
substance has no ERPG-2, then the endpoint is the level of concern 
(LOC) from the Technical Guidance for Hazards Analysis, updated where 
necessary to reflect new toxicity data. EPA recognizes the limitations 
associated with ERPG-2 and LOC values and is working with other 
agencies to develop Acute Exposure Guideline Limits (AEGLs). When these 
values have been developed and peer-reviewed, EPA intends to adopt them 
through rulemaking as the toxic endpoints for this rule. For 
flammables, vapor cloud explosion distances will be based on an 
overpressure of 1 psi; for alternative flammable releases, radiant heat 
distances will be based on an exposure of 5 kW/m\2\ for 40 seconds. For 
vapor cloud fires and jet fires, the lower flammability limit provided 
by the National Fire Protection Association (NFPA) or other sources 
shall be used.
    EPA selected 1.5 meter per second (m/s) wind speed and F 
atmospheric stability class as the default worst-case scenario 
meteorological conditions. If the owner or operator has meteorological 
data that show that higher minimum wind speeds or less stable 
atmospheric class conditions existed at the source at all times in the 
previous three years, then the higher wind speed and different 
stability class may be used. Alternative release analyses may use site-
specific, typical meteorological conditions. If the owner or operator 
has no data on typical meteorological conditions, then conditions used 
in the RMP Offsite Consequence Analysis Guidance (3 m/s and D 
stability), may be used. Although EPA is providing technical guidance 
and reference tables for worst-case and alternative release scenario 
assessments, owners or operators may use any generally recognized, 
commercially or publicly available air dispersion modeling techniques, 
provided the modeling parameters specified in the rule are used.
    For the hazard assessment and the RMP, populations potentially 
affected are defined as those within a circle that has as its center 
the point of release and its radius the distance to the toxic or 
flammable endpoint. Owners or operators may use Census data to define 
this population, and may update those data if they are inaccurate. EPA 
suggests that owners or operators use LandView, an electronic 
publication of environmental, geographic and demographic information 
published by EPA and the Bureau of Census. The presence of schools, 
hospitals, other institutions, public arenas, recreational areas, and 
large commercial and industrial developments that can be identified on 
street maps within this circle must be noted in the RMP, but the number 
of people occupying them need not be enumerated. The presence of 
environmental receptors within this circle must also be listed. EPA has 
defined environmental receptors as natural areas such as national or 
state parks, forests, or monuments; officially designated wildlife 
sanctuaries, preserves, refuges, or areas; and Federal wilderness 
areas, that can be exposed to an accidental release. All of these can 
be identified on local U.S. Geological Survey maps or maps based on 
USGS data.
    The five-year accident history will cover all accidents involving 
regulated substances, but only from covered processes at the source 
that resulted in serious on site or certain known offsite impacts in 
the five years prior to the submission of each RMP. EPA has replaced 
the definition of significant accidental release with specific 
definitions of the types of releases to be covered under each of the 
specific requirements previously associated with this definition.

D. Prevention Programs

    EPA has retained the management system requirement proposed in the 
NPRM, but only for Program 2 and 3 processes. EPA has moved the 
management system requirement from the prevention program section to 
the general requirements section because it should be designed to 
oversee the implementation of all elements of the risk management 
program. The owner or operator must designate a qualified person or 
position with overall responsibility for the program and specify the 
lines of authority if responsibility for implementing individual 
requirements is assigned to other persons or positions.
    In the SNPRM, EPA proposed a Program 2 prevention program that 
covered training, maintenance, safety precautions, and monitoring, but 
did not specify any particular actions. EPA solicited comment on 
whether specific prevention activities should be required for Program 2 
sources, such as any of the specific activities initially proposed in 
the NPRM. For today's rule, EPA has developed seven specific elements 
for the Program 2 prevention program: safety information (Sec. 68.48), 
hazard review (Sec. 68.50), operating procedures (Sec. 68.52), training 
(Sec. 68.54), maintenance (Sec. 68.56), compliance audits (Sec. 68.58), 
and incident investigation (Sec. 68.60). Most Program 2 processes are 
likely to be relatively simple and located at smaller businesses. EPA 
believes owners or operators of Program 2 processes can successfully 
prevent accidents without a program as detailed as the OSHA PSM, which 
was primarily designed for the chemical industry. EPA combined and 
tailored elements common to OSHA's PSM and EPA's NPRM to generate 
Program 2 requirements and applied them to non-petrochemical industry 
processes. EPA is also developing model risk management programs (and 
RMPs) for several industry sectors that will have Program 2 processes. 
These model guidances will help sources comply by providing standard 
elements that can be adopted to a specific source. EPA expects that 
many Program 2 processes will already be in compliance with most of the 
requirements through compliance with other Federal regulations, state 
laws, industry standards and codes, and good engineering practices.
    The Program 3 prevention program includes the requirements of the 
OSHA PSM standard, 29 CFR 1910.119 (c) through (m) and (o), with minor 
wording changes to address statutory differences. This makes it clear 
that one accident prevention program to protect workers, the general 
public, and the environment will satisfy both OSHA and EPA. For 
elements that are in both the EPA and OSHA rules, EPA has used OSHA's 
language verbatim, with the following changes: the replacement of the 
terms ``highly hazardous substance,'' ``employer,'' ``standard'' and 
``facility'' with ``regulated substance,'' ``owner or operator,'' 
``part or rule,'' and ``stationary source''; the deletion of specific 
references to workplace impacts or to ``safety and health;'' changes to 
specific schedule dates; and changes to references within the standard. 
The ``safety and health'' and ``workplace impacts'' references occur in 
OSHA's PSM standard in process safety information (29 CFR 1910.119 
(d)(2)(E)), process hazards analysis (29 CFR 1910.119(e)(3)(vii)), and 
incident investigation (29 CFR 1910.119(m)(1)). These changes are 
designed to ensure that OSHA retains its oversight of actions designed 
to protect workers while EPA retains its oversight of actions to 
protect public health and the environment and to remove possible 
interpretations that certain elements of process safety management fail 
to account for offsite impacts. Commenters were particularly concerned 
about the phase-in of process hazard analyses

[[Page 31673]]

(PHAs). Under the final rule, PHAs conducted for OSHA are considered 
adequate to meet EPA's requirements. They will be updated on the OSHA 
schedule (i.e., by the fifth anniversary of their initial completion). 
This approach will eliminate any need for duplicative analyses. 
Documentation for the PHA developed for OSHA will be sufficient to meet 
EPA's purposes.
    EPA anticipates that sources whose processes are already in 
compliance with OSHA PSM will not need to take any additional steps or 
create any new documentation to comply with EPA's Program 3 prevention 
program. Any PSM modifications necessary to account for protection of 
public health and the environment along with protection of workers can 
be made when PSM elements are updated under the OSHA requirements. EPA 
has modified the OSHA definition of catastrophic release, which serves 
as the trigger for an incident investigation, to include events ``that 
present imminent and substantial endangerment to public health and the 
environment.'' As a result, this rule requires investigation of 
accidental releases that pose a risk to the public or the environment, 
whereas the OSHA rule does not. EPA recognizes that catastrophic 
accidental releases primarily affect the workplace and that this change 
will have little effect on incident investigation programs already 
established. However, EPA needs to ensure that deviations that could 
have had only an offsite impact are also addressed.

E. Emergency Response

    EPA has adopted the emergency response requirements found in the 
statute, without additional specific planning requirements beyond those 
necessary to implement the statute. This action is consistent with the 
Agency's effort to develop a single Federal approach for emergency 
response planning. The Presidential Review of Federal release 
prevention, mitigation, and response authorities (required under 
section 112(r)(10) of the Clean Air Act) found that there is seldom 
harmony in the required formats or elements of response plans prepared 
to meet various Federal regulations. Accordingly, EPA has committed not 
to specify new plan elements and/or a specific plan format in today's 
rule beyond those that are statutorily required. EPA believes that 
plans developed to comply with other EPA contingency planning 
requirements and the OSHA Hazardous Waste and Emergency Operations 
(HAZWOPER) rule (29 CFR 1910.120) will meet most of the requirements 
for the emergency response program. In addition, EPA and other National 
Response Team agencies have prepared Integrated Contingency Plan 
Guidance (``one plan'') (NRT, May 1996). The NRT and the agencies 
responsible for reviewing and approving federal response plans to which 
the one plan option applies agree that integrated response plans 
prepared in the format provided in this guidance will be acceptable and 
be the federally preferred method of response planning. An emergency 
response plan that includes the elements specified in this guidance can 
be used to meet the requirements in today's rule. The final rule also 
provides relief for sources that are too small to respond to releases 
with their own employees; these sources will not be required to develop 
emergency response plans provided that procedures for notifying non-
employee emergency responders have been adopted and that appropriate 
responses to their hazards have been addressed in the community 
emergency response plan developed under EPCRA (42 U.S.C. 11003) for 
toxics or coordinated with the local fire department for flammables.

F. Risk Management Plan (RMP)

    Owners or operators must submit their first RMP by the date 
specified in Sec. 68.10. After the RMP is submitted, changes at the 
source may require updates to the RMP other than the standard update 
every five years. If a new substance or new process is added, the RMP 
will need to be revised and submitted by the date the substance is 
first in the process above the threshold quantity. If changes to 
processes require revised hazard assessments or PHAs, or if a process 
changes Program level, the source must submit a revised RMP within six 
months.
    EPA intends that the RMP will be submitted in a method and format 
to a central point as specified by EPA. States, local entities 
including local emergency planning committees (LEPCs), and the public 
will be able to access all RMPs electronically. This process will 
relieve states and local entities of the burden of filing documents and 
providing public access to them without limiting these agencies' or the 
public's access to the information.
    The RMP is a multi-purpose document. The CAA requires that the RMP 
indicate compliance with the regulations and also include the hazard 
assessment, prevention program, and emergency response program. EPA is 
mandated to develop a program for auditing RMPs and requiring 
revisions, where appropriate. The RMP, therefore, must include enough 
data to allow the implementing agency to determine, through review of 
the RMP, whether the source is in compliance with the rule. EPA, 
however, believes that the RMP must serve another function; to provide 
information to the public in a form that will be understandable and 
will encourage the public to use the information to improve the 
dialogue with sources on issues related to prevention and preparedness.
    To meet both of these purposes, the RMP will consist of the 
source's registration; an executive summary that will provide a brief 
description of the source's activities as they relate to covered 
processes and program elements; and data elements that address 
compliance with each of the rule elements. While the public and 
implementing agencies could make use of all sections of the RMP, the 
executive summary will provide text descriptions and give the source a 
chance to explain its programs in a format that will be easy for 
communities to read and understand. The data elements will provide the 
implementing agency with the basic data it needs to assess compliance 
without asking for detailed documentation. The Agency is considering 
development of an RMP form where the data elements of the form would 
provide the implementing agency with the basic data it needs to assess 
compliance without asking for detailed documentation. All data elements 
would be checkoff boxes, yes/no answers, or numerical entries.
    This approach will provide data that anyone can download or search. 
States, communities, trade associations, or public interest groups may 
want to use the data or a subset of the data to create databases that 
allow them to compare sources in the same industry or same area. For 
example, a local entity will be able to download data from all 
reporting sources that are similar to ones in its community to 
determine whether the quantities stored and process controls used are 
typical. The information will provide the public with data that will 
enhance their dialogue with sources. It will also help sources and 
trade associations to understand practices in their industries and 
identify practices that could be used to reduce risks. The risk 
management program documentation will remain at the source and will be 
available for review by EPA and the implementing agency.

G. Air Permitting

    The SNPRM discussed the relationship between section 112(r) and CAA 
air permitting requirements for sources subject to both provisions. 
Under the CAA, air permitting authorities must ensure that sources are

[[Page 31674]]

in compliance with applicable requirements to issue a permit. Because 
section 112(r) is an applicable requirement, EPA has identified in the 
final rule the permit conditions and the actions owners or operators 
and air permitting authorities must take to ensure compliance. The 
permit must identify part 68 as an applicable requirement and establish 
conditions that require the owner or operator of the source to submit 
either a compliance schedule for meeting the requirements of part 68 by 
the date specified in Sec. 68.10(a) or, as part of the compliance 
certification submitted under 40 CFR 70.6(c)(5), a certification 
statement that, to the best of the owner or operator's knowledge, the 
source is in compliance with all requirements of this part, including 
the registration and submission of the RMP. The owner or operator must 
also submit any additional relevant information requested by the air 
permitting authority or designated agency to ensure compliance with the 
requirements of this section. If a permit is already issued that does 
not contain the provisions described above, then, the owner or operator 
or air permitting authority shall initiate permit revision or reopening 
according to the procedures in 40 CFR 70.7 or 71.7 to incorporate the 
terms and conditions as described above. EPA also allows the state to 
assign the authority to implement and enforce these requirements to 
another agency or agencies (the ``designated agency'') to take 
advantage of resources or accident prevention expertise that might be 
available in these other agencies. Finally, the air permitting 
authority or designated agency must: (1) Verify that the source owner 
or operator has registered and submitted an RMP or a revised plan when 
required; (2) verify that the source owner or operator has submitted 
the proper certification or compliance schedule; (3) for some or all 
sources, use one or more mechanisms such as, but not limited to, a 
completeness check, source audits, record reviews or facility 
inspections to ensure that permitted sources are in compliance; and (4) 
initiate enforcement action, based on the requirements of this section, 
as appropriate.

H. Other Issues

    In the SNPRM, EPA discussed three other issues raised by 
commenters: accident information reporting, public participation, and 
inherently safer technologies. EPA has decided not to develop any 
requirements related to these issues at this time. Although EPA 
continues to believe that accident reports that provide more detail on 
the causes and impacts of accidents could be useful, the Agency has 
decided to limit such reporting required under this rule to the five-
year accident history mandated by the CAA. When necessary, EPA will use 
its authority to investigate individual accidents and to seek 
additional information to the extent authorized by CAA section 114 
(i.e., to determine compliance with this rule and CAA section 
112(r)(1), to support further rule development, and to assist research 
on hazard assessment).
    Secondly, the Agency encourages sources, the public, and local 
entities to work together on accident prevention issues, but believes 
that the wide variety and large number of sources subject to this rule 
make any single mandatory approach to public participation 
inappropriate. RMP information should be used as the basis for dialogue 
between the community and sources on accidental release prevention, 
risk reduction and preparedness for emergency response. Industry and 
the public should continue to use the LEPC as a mechanism for this 
dialogue.
    Finally, EPA does not believe that a requirement that owners or 
operators conduct searches or analyses of alternative process 
technologies for new or existing processes will produce significant 
additional benefits. Many commenters, including those who support these 
analyses, indicated that an assessment of inherently safer design 
alternatives has the most benefit in the development of new processes. 
Industry generally examines new process alternatives to avoid the 
addition of more costly administrative or engineering controls 
associated with a design that may be more hazardous in nature. Although 
some existing processes may be judged to be inherently less safe than 
others, EPA believes most of these processes can be safely operated 
through management and control of the hazards without spending 
resources searching for unavailable or unaffordable new process 
technologies. Application of good PHA techniques often reveals 
opportunities for continuous improvement of existing processes and 
operations without a separate analysis of alternatives. EPA encourages 
owners or operators to continue to examine and adopt viable alternative 
processing technologies, system safeguards, or process modifications to 
make new and existing processes and operations inherently safer. 
Through the process and prevention program information in the RMP, 
sources can demonstrate, and users of the RMP information can observe 
and promote, progress toward safer processes and operations.
    EPA is considering the development of incentives and awards to 
stimulate inherently safer alternative research and development, public 
outreach and education, and risk communication efforts. The Agency 
welcomes ideas and participation in this effort.

III. Discussion of Comments

    EPA received 1220 comments, including 180 relevant comments 
submitted for the List Rule, 757 comments on the NPRM, and 283 comments 
on the SNPRM. The commenters represented 92 chemical manufacturers, 81 
other chemical users, 111 petroleum industry companies, 174 industry 
trade associations, 40 other trade associations, 58 agricultural supply 
retailers, 102 propane retailers, 132 explosives users, 29 water 
treatment facilities, 26 utilities, 66 state agencies, 63 local 
governments, 8 other Federal agencies, 52 academics and consultants, 61 
environmental groups, 6 labor unions, and 31 private citizens. The 
remaining 88 letters were requests for extensions of the comment 
period, interim or duplicate sets of comments, or had been sent to the 
incorrect docket. The major issues raised by the commenters are briefly 
addressed below; a complete presentation of the Agency's response to 
the comments received on this rulemaking is available in the Risk 
Management Program Rule: Summary and Response to Comments in the docket 
(see ADDRESSES).
    Many commenters requested that EPA's list be identical to OSHA's 
list of highly hazardous substances and no thresholds should be less 
than OSHA's. These comments were addressed in the final list rule (59 
FR 4478; January 21, 1994) and background material related to these 
issues is available in docket number A-91-74 (see ADDRESSES).

A. Tiering

    Commenters on the NPRM suggested that EPA create different levels 
of requirements for sources that pose different risks. In the SNPRM, 
EPA proposed three tiers: a low hazard tier for sources whose worst-
case release would not affect any public or environmental receptors of 
concern; a medium hazard tier for sources that were not eligible or 
covered by the low or high hazard tiers; and a high hazard tier based 
on either industry sector accident history and number of employees or 
simply based on the number of employees. Generally, commenters were 
concerned that all processes at a source would need to be eligible for 
Program 1 before any process could be. EPA has revised the rule to 
clarify that eligibility for any tier

[[Page 31675]]

(Program) is based on process criteria, not source. If a process meets 
Program 1 criteria, the owners or operators need only meet Program 1 
requirements for that process even if other processes at the source are 
subject to Program 2 or Program 3.
    1. Rationale. Only 2 of the 57 commenters opposed tiering arguing 
that the CAA mandates that all covered sources be required to complete 
a full prevention program and that Congress had considered and rejected 
exemptions. One commenter argued that EPA had already accounted for 
``differences in size, operations, processes, class and categories of 
sources'' in developing the list and thresholds. Most commenters 
supported tiering as an appropriate way to recognize different levels 
of risks and to allow sources and emergency responders to focus on the 
highest risk processes.
    EPA disagrees that the CAA requires all covered processes to comply 
with the same detailed risk management program. EPA listed regulated 
substances because of their inherent hazards, such as toxicity and 
volatility. EPA did not consider, nor does the CAA indicate that it may 
consider, ``differences in size, operations, processes, class and 
categories of sources'' in selecting chemicals or setting thresholds. 
In establishing section 112(r)(7) requirements, however, Congress 
clearly recognized that a ``one-size-fits-all'' approach may not be 
appropriate for these regulations and directed EPA to consider these 
factors in the development of the accident prevention regulations. 
Furthermore, EPA strongly disputes the assertion that it has exempted 
any source from regulation by creating different programs for different 
sources. As noted below, all covered processes will be addressed in 
RMPs that contain hazard assessment, prevention, and response 
information, as required by statute.
    2. Program 1 vs. Program 2 and Program 3 Criteria. Commenters 
generally supported Program 1 for low-risk sources, but argued that 
few, if any, sources would qualify because the requirements were too 
stringent.
    a. Potential for Offsite Impact. Commenters generally agreed that 
sources that can demonstrate no offsite impact should be eligible for 
Program 1, but only public health should be considered, not 
environmental impacts. Others stated that only sources posing a threat 
of ``considerable'' impacts should not be eligible for Program 1. One 
commenter stated that EPA's worst-case scenario is unrealistic and its 
use as a Program 1 trigger is unreasonable. Other commenters want EPA 
to allow site-specific modeling for the offsite consequence analysis, 
rather than look-up tables.
    In today's rule, EPA specifically allows owners or operators to use 
site-specific air dispersion modeling for their offsite consequence 
analyses. EPA disagrees that offsite impacts should be limited to 
``considerable'' impacts. When offsite impacts are possible, it may be 
reasonable to implement some additional measures to reduce accidental 
releases, especially when the burden of measures such as additional 
training or safety precautions is low. Programs 2 and 3 provide 
flexibility to allow source-specific consideration of the appropriate 
level of effort. Program 1 requires no additional prevention measures, 
which is only categorically justifiable if such measures would not 
reduce offsite impact. It is reasonable to couple a no impact criterion 
with a conservative worst-case scenario to conclude categorically the 
public would not benefit from additional prevention measures. If no 
impact can be demonstrated for a conservative worst-case release, then 
no impact is likely to occur for any other release event, and the 
process could be judged to pose a low threat to the surrounding area.
    EPA has decided that potential impact on environmental receptors 
resulting from a worst-case scenario will not be a criterion to 
determine eligibility for Program 1. EPA agrees that very little, if 
any, data exist on the potential acute environmental impacts or 
environmental endpoints associated with listed chemicals upon 
accidental release. In addition, the offsite consequence distances 
estimated using human acute toxicity or overpressure effects may not be 
directly relevant to environmental effects. However, owners or 
operators will be required to document in the RMP the presence of such 
receptors within the distance determined for the worst case. EPA 
believes that natural resource agencies and the public will be able to 
benefit from the environmental receptors information in the RMP in 
discussions with the source.
    b. Accident History for Program 1. Many commenters objected to 
accident history as a Program 1 criterion, arguing that a process that 
had a significant accidental release in the previous five years may 
have been changed to reduce or eliminate future events and public 
impact. Several commenters suggested that such processes that otherwise 
meet Program 1 criteria should remain eligible, but be required to 
justify and document the changes. Some commenters also objected to 
EPA's proposed definition of significant accidental release, arguing 
that many companies and emergency responders conservatively evacuate or 
shelter-in-place during minor incidents. Under the proposed definition, 
these actions disqualify a process from Program 1 even if there were no 
offsite impacts. Some commenters stated that the accident history 
provision was unnecessary because, by definition, a Program 1 process 
is not capable of an accidental release that could affect public 
receptors.
    EPA has decided to retain the accident history criterion for 
Program 1 processes, excluding events with evacuations and shelterings 
in place, and to drop the definition of significant accidental release. 
Program 1 eligibility is not a one-time exercise; owners or operators 
must certify in each RMP that no qualifying releases have occurred 
since the previous RMP submission and provide current worst-case 
release data indicating no offsite impacts are anticipated in the 
future. Program 1 criteria and accident history provide owners or 
operators an opportunity to demonstrate to the community ongoing 
excellence in accident prevention and an incentive to search for and 
implement ways, such as inventory reduction, to reduce the potential 
for offsite impacts associated with large scale accidental releases. 
Further, the unique circumstances surrounding past accidents can 
provide a reality check on the theoretical modeling and worst-case 
scenario claims used for the offsite consequence assessment and serve 
to verify that administrative controls and passive mitigation measures 
work as intended. EPA decided to delete public evacuations or 
shelterings-in-place as criteria for Program 1 eligibility. EPA is that 
inclusion of these criteria in Program 1 eligibility may create a 
perverse incentive not to report releases and it may encourage sources 
and local emergency officials to take more chances during an event when 
there may be potential exposures that do not rise to the endpoint 
specified in this rule but would otherwise be worthy of precautionary 
actions by the source or by local officials. If the evacuation or 
sheltering takes place because of a concern for public exposure to an 
endpoint as specified in this rule, then public receptors necessarily 
would be under the worst case distance and the process would not be 
eligible for Program 1 under the criteria of the rule. Owners or 
operators of processes that meet Program 1 eligibility requirements are 
required to report a 5 year accident history for that process. If local

[[Page 31676]]

emergency planners, first responders or the public have concerns about 
processes in Program 1 because of a past evacuation or sheltering-in-
place event, then mechanisms under EPCRA could be used to gather more 
information from the source about its prevention program (such as EPCRA 
sections 302(b)(2) [designation of a facility if it does not already 
handle extremely hazardous substances listed under section 302] and 
303(d)(3) [provision of information to the emergency planning 
committee]) and involve the source in emergency planning. Sources and 
local first responders should be discussing evacuation and sheltering-
in-place criteria and decisions as part of emergency response planning.
    c. Other. Many commenters asked that specific industries such as 
ammonia refrigeration, retail fertilizer outlets, all flammables, and 
all non-PSM sources be assigned to Program 1. EPA disagrees because 
each source has unique surroundings that must be considered in the 
worst-case assessment and each source must demonstrate favorable 
accident history. All ammonia refrigeration units covered by this rule 
are already subject to OSHA PSM; many of these have had accidents that 
affected the community and should be required to complete the 
requirements of the hazard assessment and emergency response program 
and provide the community with full RMP information. According to the 
industry, a typical ammonia fertilizer retailer handles 200 tons of 
ammonia. Some retailers may be very geographically isolated and can 
qualify for Program 1, but EPA expects that most will be subject to 
Program 2. Given the large quantity of ammonia involved, EPA considers 
it important that the community have information on offsite 
consequences from these sources and that the owner or operator takes 
the necessary steps to address accidental release prevention and 
emergency response.
    EPA expects that some sources handling flammables will qualify for 
Program 1 because the distance to a 1 psi overpressure is generally 
less than distances to toxic endpoints. Nonetheless, those sources 
handling flammables in sufficient quantity to generate a potential 
offsite impact should provide the community with information on hazards 
and address prevention and response steps. Many sources handling 
flammables are already subject to PSM; the only additional steps 
required under this rule are completion of the hazard assessment and 
emergency response programs and submission of an RMP.
    EPA does not agree that non-PSM sources should be assigned to 
Program 1. Many of these sources could have an accidental release that 
can affect the community. OSHA exempted retailers because they are 
covered by other OSHA or state regulations that address workplace 
safety, not because they are incapable of having offsite impacts. All 
retailers are in Program 2 unless they can meet Program 1 criteria; 
thus, they should be taking prevention steps and will be providing the 
community with information. Compliance with other existing Federal and 
state programs may satisfy many Program 2 prevention requirements, 
thereby limiting the burden. In addition, EPA expects to develop model 
risk management programs for these sectors. Public sources in states 
without delegated OSHA programs are not covered by OSHA PSM because 
OSHA is barred by law from regulating them. Nonetheless, these sources 
may pose a threat to the community. Today's rule places these sources 
in Program 2.
    3. Program 2 vs. Program 3 Criteria. In the SNPRM, EPA's preferred 
approach assigned sources to Program 3 based on SIC code and number of 
employees; sources in specified SIC codes with 100 or more full-time 
employees (FTE) would have been subject to the full program in 3 years; 
sources in a subset of these SIC codes with 20 to 99 FTEs would have 
been subject to the full program in 8 years. The alternative was to 
impose the full program on all sources with more than 100 FTEs. Most 
SNPRM commenters submitted suggestions and arguments about this 
approach.
    a. Number of Employees. Only two commenters supported using the 
number of employees as the sole criterion, arguing it would be the 
easiest approach to implement with the greatest amount of industry 
participation. Commenters opposed it because the number of employees 
proposed does not reliably correlate with risk, hazard, or quantity on 
site, and because it could act as an incentive to reduce employment. In 
addition, some commenters stated that smaller sources may have fewer 
resources to manage hazards and, therefore, may pose a greater risk to 
the public.
    EPA agrees and has deleted the number of employees as a Program 3 
criterion. Although size of a source in the manufacturing sectors may 
be related to the quantities on site and complexity of the processes, 
many other sources may have similar characteristics with fewer 
employees. Complexity is more directly associated with the type of 
industry (i.e., SIC code) than with number of employees; a highly 
automated process may involve fewer employees and be more complex than 
a more labor intensive process. Quantity, if relevant, can be directly 
measured rather than indirectly by number of employees. In addition, 
EPA was concerned that the data on which the Agency based its proposed 
approach may not be representative of all accidental releases. These 
data, drawn from reports to the National Response Center and EPA 
regions, appear to indicate that larger sources have more and larger 
accidental releases than do smaller sources. This finding, however, may 
in part reflect different levels of reporting, rather than different 
levels of accidents. Both Federal and state officials report that the 
number of releases has risen in recent years as more sources learn 
about their reporting obligations. EPA has decided that, because the 
processes within the SIC codes basically handle the same chemicals in 
the same way, smaller sources should not be moved to a different 
Program based on the number of employees.
    b. SIC Code. Fifty-seven commenters, particularly those in the oil 
industry, utilities, and public systems, supported the use of SIC codes 
based on accident history; 28 commenters opposed it. Supporters argued 
that industry accident records represented a reasonable criterion for 
identifying high-risk sources. If an entire industry has a long history 
without accidental release, it may indicate that the materials handled 
and handling conditions generate a smaller potential for serious 
releases or that the industry is effectively controlled by government 
or industry standards. Some commenters argued that industry accident 
histories reflect underlying risk better than individual source 
accident histories because accidents are rare events; a source with no 
accidental releases over the previous five years is not necessarily 
safe.
    Commenters opposing the use of SIC codes stated that the approach 
is arbitrary, that accidents with only onsite effects should not be 
used, that sources in other industry sectors handle similar quantities 
and pose similar risks, and that sources within an industry that have 
successful risk management practices are penalized by a few isolated 
sources within the industry.
    EPA has decided to retain the use of SIC codes, adding SIC 2865 
based on further review of accident histories, and to add coverage by 
the OSHA PSM standard as a separate criterion for Program 3. EPA 
selected the SIC codes by analyzing accident data filed by

[[Page 31677]]

sources in response to EPA's request for information in the Accidental 
Release Information Program (ARIP). ARIP collects data from certain 
sources that report releases under CERCLA section 103. EPA selected the 
SIC codes that showed a high frequency of the most serious accidents 
across a significant percentage of all sources within the SIC code to 
avoid mischaracterizing an industry based on isolated, problematic 
sources. Data on the selection criteria were summarized in the SNPRM 
and the docket at the time of the SNPRM. The accident history of the 
cyclic crudes industry (SIC code 2865) is similar to that of the 
categories selected. EPA disagrees that only offsite impacts should be 
considered; accidental releases that caused death, hospitalizations, or 
injuries on site are also of concern because they indicate significant 
safety problems that could lead to releases that cause impacts offsite. 
The SIC codes selected by EPA are basically the same ones OSHA selected 
for its PSM program inspection focus. EPA disagrees that sources are 
``penalized'' by this approach because owners or operators of processes 
in these SIC codes have an opportunity to present their safety record, 
demonstrate the success of their accident prevention programs, and 
communicate with the local community the basis for their risk 
management practices. Sources that receive Merit or Star status in the 
OSHA Voluntary Protection Program will be favorably distinguished from 
others in the same industry when implementing agencies are selecting 
sources for audits (see section III.T.1 below).
    EPA agrees that serious accidents occur infrequently even at 
sources with poor safety practices and that industry-wide accident 
records provide a better mechanism than the accident history at a 
single source for identifying those sectors whose chemicals and 
processes may lead to serious releases. A high proportion of the 
sources in some SIC codes reported releases; EPA's analysis 
specifically took into account the number of reports from individual 
sources to avoid selecting an SIC code because of a small number of 
sources with serious safety problems.
    The OSHA PSM already applies to most covered processes in the 
selected SIC codes. EPA expects that there will be fewer than 400 
additional processes assigned to Program 3 that are not already subject 
to the OSHA PSM standard at the approximately 1,400 sources in these 
SIC codes and that all of these sources will already have other 
processes covered by OSHA PSM. Consequently, fulfilling the RMP 
requirements imposes little additional burden.
    EPA decided to include all covered processes currently subject to 
the OSHA PSM standard in Program 3 to eliminate any confusion and 
inconsistency between the prevention requirements that the owners or 
operators of such processes must meet. EPA's Program 3 prevention 
program is identical to the OSHA PSM standard. Including OSHA PSM 
processes in Program 3, therefore, imposes no additional burden on 
these processes; the only new requirements for such processes are the 
hazard assessment, emergency response program, and the RMP, which are 
the same under Programs 2 and 3.
    c. Site-Specific, Risk-based Criteria. Many commenters stated that 
Program assignment should be based on site-specific risk-based 
criteria. Accident history is one such criterion and is discussed 
separately in Section III.A.3.d. Other criteria suggested include 
population density or proximity, quantity on site, number of substances 
held above the threshold, process conditions, toxicity, volatility, 
alternative release scenario results, or combinations of these factors 
as a risk index.
    EPA agrees with commenters that Program assignments should be risk-
based to the extent possible; however, as the variety of suggestions 
indicates, a considerable number of variables would need to be 
considered. EPA knows of no standard approach or equation that is used 
and generally accepted. The variety of suggestions indicate the 
likelihood that any proposed formula would meet opposition. No 
commenter provided a method to comprehensively address these factors on 
a nation-wide basis.
    An important consideration for EPA in developing the rule 
provisions for Program assignment was to avoid undue complexity, 
confusion, and resource expenditure by sources and implementing 
agencies implementing the rule's criteria. To some extent, EPA has 
incorporated risk factors, including site-specific factors, in 
determining which sources are eligible for which Program. For example, 
Program 1 eligibility already considers the potential for offsite 
impacts; any process for which there are no public receptors within the 
distance to an endpoint from a worst-case release may be eligible for 
Program 1, provided there have been no releases with certain offsite 
consequences within the previous five years. Today's rule allows 
sources to consider passive mitigation and administrative controls in 
conducting the worst-case release analysis. Such site-specific 
considerations affect the extent of potential exposure to a worst-case 
release, and thus are reflected in the Program 1 eligibility criteria. 
Elements of risk such as process complexity and accident history are 
also reflected the design of Program 2 and Program 3 requirements and 
the assignment of processes to these Programs. Program 2 sources 
generally handle and store regulated substances, but do not react or 
manufacture them. EPA believes Program 2 sources can take prevention 
steps that are less detailed than those in the OSHA PSM standard and 
still accomplish accident prevention that is protective of any 
population nearby. Program 3 is reserved for processes already subject 
to the OSHA PSM standard and processes with high accidental release 
histories. The SIC codes with an accident history selected by EPA for 
Program 3 are typically complex processes. The PSM standard was 
designed for, and is particularly appropriate for, these processes.
    EPA takes issue with the appropriateness of some of the suggested 
factors. Meteorological conditions vary too much to be considered in 
determining a risk level. Chemical quantity alone does not accurately 
relate to risk because the location and handling conditions can 
dramatically change the potential for exposures.
    In addition, EPA has implementation concerns about a detailed, 
national, multi-factor, risk-based approach, were it to be feasible. 
States such as Delaware have used a simple version of a risk-based 
approach and found that it created serious problems for the state and 
the sources. Smaller sources and those without technical staff have had 
great difficulty in implementing the approach and have had to rely on 
state officials to determine applicability for them. Delaware 
specifically recommended that EPA not attempt implementing a similar 
approach on a national basis because of the burden it imposes on the 
state and the confusion and uncertainty it creates for sources. 
Delaware has fewer than 100 sources; nationally, EPA estimates that 
66,000 sources will be subject to the rule, approximately 62,000 of 
which are outside of the chemical and refining sectors. If implementing 
agencies had to help most of these sources determine the index score 
and Program for each process, not only would the burden on the agencies 
be extreme, but implementation would also be delayed. Furthermore, were 
EPA to simply iden
FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
tify risk factors without an index and leave the 
determination of Program

[[Page 31678]]

level to sources or implementing agencies, the process for such site-
specific determinations would be even more complex and resource 
intensive for sources and implementing agencies; it would create 
disincentives for a state to become involved and to take on the role of 
an implementing agency. EPA believes it is better to have sources and 
agencies focus their resources on prevention activities.
    EPA considered, but decided against, a less comprehensive risk-
based approach using proximity or population density as criteria for 
distinguishing between Program 2 and 3. EPA recognizes that accidental 
releases from sources near or in densely populated areas may harm more 
individuals and be perceived to pose a greater risk than other sources. 
However, as stated above, EPA believes that the type of process, its 
complexity and accident history should be considered for Program 2 or 3 
assignment, regardless of the number of people potentially exposed. In 
other words, EPA does not believe the streamlined Program 2 prevention 
elements should apply to a complex Program 3 process just because fewer 
persons could be potentially exposed or that the Program 3 prevention 
elements should apply to a Program 2 process because more people could 
be potentially exposed. EPA believes that populations offsite should be 
protected from harm based on the type of process; the Program 2 
prevention elements, properly applied to the expected types of Program 
2 processes, serves to protect off-site populations, just as the 
Program 3 prevention elements for complex processes serves to protect 
offsite populations.
    If Program assignments were based on the alternative release 
scenario results, sources would not have the flexibility and latitude 
in today's rule for these scenarios because more definite criteria 
would need to be considered to ensure the proper scenarios and results 
are assessed. This places more emphasis and burden for sources on the 
offsite consequence assessment rather than on accident prevention and 
communication with the public and first responders. Furthermore, 
because active mitigation includes process and control equipment that 
may fail, considering such equipment in evaluating risk would not be 
appropriate without detailed review by the source and oversight by the 
implementing agency.
    Some commenters suggested yet another variation of a less 
comprehensive, ``risk''-based approach that would have EPA use a site-
specific analysis of likelihood of release to assign Program levels. 
Many of the same difficulties in developing a ``risk index'' for 
determining Program assignments would apply to an attempt to 
incorporate likelihood in a more sophisticated manner than EPA was able 
to do in its analysis of accident history by SIC code. In addition to 
the substance-specific properties considered as part of the chemical 
listing criteria, the site-specific likelihood of a release depends on 
a number of factors, including the appropriateness of the equipment in 
use, the maintenance of that equipment, operator performance, and 
safety systems and their performance. Evaluating site-specific 
likelihood of release requires data on each of these items; such data 
rarely exist especially for complex processes where a variety of 
equipment must be evaluated along with the performance of multiple 
operators and maintenance workers. Using surrogate data (e.g., 
manufacturer's failure rate data) introduces error of an unknown 
magnitude to the analysis. Such analyses are very costly and produce 
results that are, at best, questionable.
    EPA also believes that assessing the likelihood of a release at 
most sites for site-specific individualized Program-level 
determinations is neither technically feasible nor cost-effective. In 
most cases, the data do not exist to conduct a meaningful analysis; 
where they do exist, the cost of developing a defensible analysis and 
overseeing it could well exceed the cost of compliance with the rule. 
Such an approach would resemble a permit program, which would be 
resource-intensive for sources and implementing agencies. EPA 
determined that the simpler approach for assigning sources to Program 1 
would provide regulatory relief for those sources that could not affect 
the public while allowing other sources to devote their resources to 
prevention activities rather than to analyses that would be subject to 
legal challenges.
    EPA notes that sources have the flexibility to implement 
appropriate accident prevention measures based on the hazards and risks 
discovered in the hazard review or process hazard analysis. The 
structure of Programs 2 and 3, therefore, reflect site-specific risk 
criteria. Further, the purpose of the risk management program and RMP 
effort is to prevent accidents and facilitate local level dialogue 
about the risks, prevention measures, and emergency response effort in 
place at the source. The local community and first responders may have 
far different concerns that should, and can be addressed better through 
today's approach than those reflected by a risk index approach.
    d. Accident History. Some commenters argued that EPA should assign 
sources to Program 3 based on the accident history of the source. One 
commenter suggested that any source with no accidental release that 
exceeded a reportable quantity (as defined in CERCLA) for the previous 
five years should be in Program 2. Others argued that a source should 
be in Program 2 if it had no significant accidental release in the 
previous five years. Some commenters said that a one-release standard 
was too stringent and that two or more significant accidental releases 
should be allowed before a source was assigned to Program 3. Another 
commenter suggested that a source with no significant accidental 
releases in the past five years and with few potentially impacted 
neighbors should be placed in Program 2.
    Other commenters opposed this approach, arguing that, in many 
cases, sources take steps to prevent recurrences following a serious 
release. In some cases, the offsite impacts from releases are minor and 
would not justify assigning a source to a particular Program. Other 
commenters stated that the absence of an accidental release can be 
indicative of lower risk, but it can also simply mean that a release 
has not yet occurred. Several commenters noted that a five-year time 
period is statistically insignificant because accidental releases are 
infrequent events.
    EPA agrees that source-specific accident history is not a 
reasonable basis for assigning processes to Programs 2 and 3. Given the 
relative infrequency of serious accidents, a five- or even ten-year 
period without an accident may not be indicative of safe operations. In 
addition, the criteria necessary to define the types of past accidental 
release for the purposes of program classification would need to be 
based on a wide variety of variables and site-specific factors, which 
would lead to confusion and unnecessary complexity. Factors such as 
weather conditions at the time of the release, rather than the size of 
a source or its management practices, often determine whether a release 
has offsite consequences. EPA believes that accident history is 
appropriately used on an industry-wide basis as described above for 
selection of Program 3 sources. If accidental releases with 
consequences appear to occur at a large proportion of sources within an 
SIC code, where similar processes, equipment and chemicals are used, 
then it is reasonable to conclude that

[[Page 31679]]

processes in that SIC code pose a greater likelihood of a high hazard 
release than others. This approach removes the need for at least one 
accident to occur at every source that EPA believes ought to be 
assigned to a particular Program, especially when such accidents are 
rare events. EPA is also concerned that using source-specific accident 
history as a criterion would create an incentive for sources to fail to 
report releases. Finally, as EPA has stated, assignments to Program 2 
and 3 also consider the appropriateness of the prevention steps for the 
types of sources. EPA believes that both Programs move sources to 
greater accident prevention.
    e. Other. Some commenters asked that the implementing agency be 
given discretion to move a source into a different Program based on 
local concerns and knowledge. EPA notes that states have the authority, 
under the CAA, to impose more, but not less, stringent standards than 
EPA (see CAA section 112(r)(11)).
    A few commenters suggested that Program 2 be limited to sources for 
which a model risk management program had been developed. The models 
would be designed to reflect risks associated with categories of 
sources that all use the same type of equipment and handle the 
substances in the same way (e.g., propane retailers and users, ammonia 
retailers). EPA considered this approach and decided that the Program 2 
prevention program provides a better, generic prevention approach for 
processes for which the more detailed PSM program would be 
inappropriate. Limiting Program 2 to those industrial sectors where 
industry-specific models are feasible would place some manufacturing 
sources at a disadvantage simply because their chemical uses, 
processes, and equipment were too varied to allow development of a 
model or because there are too few sources to justify use of EPA or 
industry resources to develop a model. In addition, if EPA were to 
limit Program 2 to sources with model programs, Program 2 regulations 
would need sufficient specificity to enforce the use of these models; 
otherwise, sources would be able to ignore both PSM and the models. EPA 
is also concerned that codifying the model plans could stifle 
innovation in safety practices. If industry codes or other Federal 
regulations on which parts of the models may be based were updated, EPA 
would have to revise its models; given the time needed to propose and 
adopt regulations, sources might have to delay implementation of new 
systems and, in some cases, might be caught between complying with a 
revised EPA or OSHA regulation or state law or complying with the 
model. Consequently, EPA decided it was better to have models available 
as guidance, but not require compliance with them. Further, EPA 
believes that the key elements of good accident prevention practices 
are captured within the requirements of the Program 2 prevention 
program. Model programs and plans are likely to build on these 
approaches, making it easier for sources in Program 2 to use models 
that are later developed by others.
    EPA is working with industry to develop model risk management 
programs and RMPs for ammonia refrigeration systems, propane 
distributors and users, and water treatment systems. EPA also expects 
to develop models for ammonia retailers and wastewater treatment 
systems. EPA encourages other industrial sectors to work together on 
additional model development.
    4. Program 1 Requirements. Commenters were generally opposed to 
posting signs, and certification of no environmental impact.
    a. Certification of No Environmental Impact. Many commenters stated 
that it would be ``virtually impossible'' to certify ``no potential for 
environmental impacts,'' as required by the SNPRM. Commenters said that 
the definition of environmental impact was too vague, that the list of 
environments suggested in the SNPRM was too broad, and that the 
language seemed to require a full environmental consequence assessment, 
making the requirement impossible. One commenter noted that companies 
would find it difficult to assert that there could be ``no 
environmental impacts'' even after an environmental consequence 
assessment reveals insignificant impacts. Two commenters suggested that 
EPA substitute ``low potential for environmental impact'' or ``no 
potential for long-term, adverse environmental impact.'' Other 
commenters requested that environmental impact be dropped or that the 
requirement be changed to mirror the Program 1 eligibility criteria 
with an indication in the RMP that no environmental receptors of 
concern were within the worst-case distance to an endpoint.
    As described above in section III.A.2.a. Potential for Offsite 
Impact, EPA has decided not to make the presence of environmental 
receptors a part of the eligibility criteria for Program 1 and has 
deleted the certification requirement. Instead, owners or operators of 
all covered processes will have to identify in the RMP any 
environmental receptors that are within the distance potentially 
affected by the worst case.
    b. Signs. Commenters generally opposed the SNPRM requirement that 
sources with Program 1 processes post signs warning of the hazards on 
site if the only regulated substances present at the site above the 
threshold quantity were listed for flammability. Commenters stated that 
local and state fire and safety codes often already require such signs. 
In addition, sources are already required under EPCRA section 312 to 
file annual inventories with the LEPC and fire department that identify 
hazards on site. Signs would have fulfilled the emergency response 
program requirements for a source. Because Program 1 eligibility will 
now be determined on a by-process basis rather than by source-wide 
criteria and because EPA has revised the emergency response program 
provisions as noted below, EPA has dropped the requirement for signs.
    c. Emergency Response Program. In the SNPRM, EPA asked whether 
additional emergency response planning and coordination should be 
required for Program 1 processes. Some commenters supported this 
requirement, while others stated that most sources are already covered 
by EPCRA and participate in community response planning. Commenters 
stated that because the worst-case release could not reach public 
receptors, such efforts were not necessary.
    In the final rule, EPA is requiring the owner or operator of a 
Program 1 process to ensure that any necessary response actions have 
been coordinated with local response agencies. EPA believes that local 
responders may become involved in an incident, even if the public is 
not threatened. No additional CAA-related planning activities are 
required, however.
    d. Other. Many commenters stated that, since Program 1 processes 
generate no offsite impact, they should be exempt from this rule. One 
commenter objected to Program 1 because members of the public, 
particularly first responders and business visitors, could still be 
hurt by a release. Other commenters suggested that the annual EPCRA 
section 312 form could be amended to indicate that a source was covered 
by the rule, replacing the RMP registration form.
    The CAA requires that all sources with more than a threshold 
quantity of a listed substance register an RMP, perform a hazard 
assessment, and develop accidental release prevention and emergency 
response programs. Therefore, total exemption of processes that meet 
Program 1 criteria is not

[[Page 31680]]

possible. See S. Rep. No. 228, 101st Cong., 1st session, at 208 
(``Senate Report'') (precursor of RMP provision mandating hazard 
assessments for sources that exceed threshold for listed substance); 
136 Congressional Record S16927 (daily ed. October 27, 1990) (remarks 
of Sen. Durenburger, sources with more than a threshold quantity are 
subject to regulations); 136 Cong. Rec. H12879 (daily ed. Oct. 26, 
1990)(remarks of Rep. Barton)(all users of hazardous chemicals are 
required to plan for accidents). Moreover, even if an exemption for 
processes that exceed a threshold were permissible, the owner or 
operator would need to take steps that are equivalent to the hazard 
assessment to establish eligibility for the exemption. The offsite 
consequence analysis is the most significant burden for a Program 1 
process under this rule. The minimal additional actions required in 
today's rule for Program 1 simply establish a record of eligibility and 
a response coordination mechanism.
    EPA recognizes that emergency responders and site visitors could be 
hurt by an accidental release from any process, but notes that 
responder safety is covered by OSHA and EPA under the HAZWOPER 
regulations. It is the owners' or operators' responsibility to inform 
visitors about the hazards and the appropriate steps to take in the 
event of an accidental release from any process subject to today's 
rule.
    Finally, EPA has based the registration information requirements in 
today's rule on the EPCRA section 312 Tier II form. The CAA requires 
that the RMP be registered with EPA. Because the EPCRA form is not 
submitted to EPA, it would not substitute for registration with EPA 
either in its present or amended form. Completion of the registration 
portion of the RMP should impose little additional burden on owners or 
operators. However, EPA recognizes the information overlap between the 
Tier II form and the RMP registration and is considering use of the RMP 
registration for the Tier II reporting requirement.
    5. Program 2 Requirements. Commenters were generally concerned 
about the lack of specific requirements for the Program 2 streamlined 
prevention program and emergency response requirements, and how 
compliance with other regulations would be incorporated.
    a. Streamlined Program. Commenters stated that the Program 2 
prevention program does not provide much, if any, regulatory relief 
because sources would need to address most of the ten elements of the 
Program 3 prevention program. Others said that the majority of the 
sources affected by the rule are already covered by OSHA PSM and 
chemical industry standards, the Program 2 requirements do not satisfy 
the CAA mandate, and that only a full process hazard analysis would 
meet the hazard assessment requirements under section 112(r). Another 
commenter argued that EPA's statement that sources must comply with the 
CAA's general duty clause was inadequate because EPA has not used, and 
has no policy about, the clause.
    EPA agrees that the preferred approach in the SNPRM did not provide 
sufficient detail on Program 2 prevention requirements to distinguish 
it from Program 3. EPA solicited comments on whether Program 2 should 
require additional, specific prevention steps. Today's rule provides 
specific requirements as discussed in section I.D above and in Section 
IV below. In the RMP, the owner or operator will be required to report 
on other Federal or state regulations, industry codes, and standards 
used to comply with prevention elements as well as any major hazards, 
process controls, mitigation systems, monitoring and detection systems 
examined in the hazard review. This streamlined prevention program 
addresses many of the PSM elements as the basis for sound prevention 
practices, but is tailored to processes with less complex chemical 
uses; this program provides considerable regulatory relief by 
substantially reducing the documentation and recordkeeping burden of 
PSM. In addition, EPA will provide guidance and model risk management 
programs to further assist Program 2 processes in developing and 
maintaining good prevention program practices.
    EPA disagrees that only a full PHA would meet the requirements of 
the Act. Section 112(r) does not contain detailed requirements for the 
hazard assessment, beyond the key components of accidental release 
scenarios and a five-year accident history. EPA believes that a PHA is 
more appropriately considered an element of a prevention program, such 
as PSM. The statute does not mandate detailed PHA engineering analyses 
for all sources, whether as part of the hazard assessment or the 
prevention program. EPA believes PHAs involve a more detailed 
engineering analysis than is necessary to prevent accidents at Program 
2 sources. The ``hazard review'' provisions of Program 2 should be 
sufficient to detect process hazards at these simpler processes. EPA 
recognizes that although hazard assessments and PHAs or process hazard 
reviews are discreet elements that can be performed independently, 
hazard assessment results can enhance PHA or process hazards reviews 
and in turn, the results of the PHA or review can enhance the hazard 
assessment. EPA encourages owners or operators to make maximum use of 
the PHA or review and hazard assessment information to manage risks and 
prevent accidents.
    Finally, sources with Program 2 requirements, as well as sources 
with Program 1 or 3 requirements, must comply with the general duty 
clause of CAA Section 112(r)(1). The general duty clause provides that 
owners and operators have a general duty to identify hazards that may 
result from accidental releases, design and maintain a safe facility, 
and minimize the consequences of any releases that occur. The general 
duty clause is a self-executing statutory requirement: it requires no 
regulations or other EPA action to take effect. The clause provides a 
separate statutory mechanism that EPA will use in appropriate 
circumstances to ensure the protection of public health and the 
environment. To date, EPA has undertaken several inspections designed 
in part to determine compliance with Section 112(r)(1). As appropriate 
at a future date, EPA may issue policies or guidance on application of 
the general duty clause.
    b. Other Regulations. Commenters generally agree that OSHA PSM, 
HAZWOPER, the OSHA hazard communication standard (29 CFR 1910.1200), 
and NFPA-58 are examples of other regulations or voluntary industry 
standards that could be cited to meet the requirements of a Program 2 
prevention program. Commenters requested that EPA provide a matrix or 
crosswalk that indicates which other regulations, standards, and codes 
met specific requirements. One commenter opposed the use of other 
regulations or referencing of voluntary industry standards, stating 
that, other than OSHA PSM, no other OSHA standard addresses safety 
precautions or maintenance. Another commenter objected that this 
approach creates another documentation burden without any commensurate 
benefit.
    EPA agrees that the SNPRM preferred approach for Program 2 was not 
specific enough and has provided more detailed requirements in this 
rule as noted above. EPA continues to believe that many of the Program 
2 prevention requirements are already met through industry compliance 
with existing regulations and voluntary standards. For example, ammonia 
retailers whose processes are designed to meet the OSHA ammonia 
handling rule (29 CFR

[[Page 31681]]

1910.111) should be able to meet the Program 2 requirement that the 
process design meets good engineering practices. This effectively 
allows sources to cite compliance with these other regulations and 
standards instead of developing specific, duplicative elements solely 
to comply with Program 2. EPA will also use these existing regulations 
and standards as it develops model programs.
    c. Emergency Response Program. Commenters supported considering 
HAZWOPER programs as adequate to meet the Program 2 emergency response 
program. A few commenters said that HAZWOPER is inadequate because it 
does not consider offsite impacts or the environment. Some commenters 
also said that coverage of a source by an EPCRA community emergency 
response plan should be sufficient. Others said that any contingency 
plan developed under Federal or state law should be considered 
sufficient because the requirements under these programs are generally 
consistent with EPA's proposed emergency response program; one 
commenter noted that, for flammable processes, compliance with 29 CFR 
1910.38 should be adequate because the response is usually evacuation 
of employees. Five commenters opposed any requirement that sources with 
Program 2 processes conduct drills or exercises because they represent 
lower hazards.
    Consistent with its efforts to consolidate Federal emergency 
planning requirements, EPA has included language in the final rule that 
will allow any source in compliance with another Federal emergency 
response program that includes the elements specified in this rule to 
use that program to meet these requirements. In particular, this 
applies to response plans prepared in accordance with the National 
Response Team's Integrated Contingency Plan Guidance (``one plan'') 
(NRT, May 1996). EPA believes that sources should have a single 
response plan; creation of multiple response plans to meet slightly 
different Federal or state standards is counterproductive, diverting 
resources that could be used to develop better response capabilities.
    EPA recognizes that some sources will only evacuate their employees 
in the event of a release. For these sources, EPA will not require the 
development of emergency response plans, provided that appropriate 
responses to their hazards have been discussed in the community 
emergency response plan developed under 42 U.S.C. 11003 for toxics or 
coordinated with the local fire department for flammables.

B. Offsite Consequence Analysis

    1. Worst-Case Release Scenario. EPA proposed in the NPRM to define 
the worst-case release as the ``loss of all of the regulated substance 
from the process * * * that leads to the worst offsite consequences'' 
and that the scenario should assume ``instantaneous release.'' Hundreds 
of commenters stated that instantaneous loss of the total process 
contents is not technically feasible for complex systems and, 
therefore, represents a non-credible worst case that would provide no 
useful information to the public or the source for risk communication, 
accident prevention, and emergency preparedness. Many commenters also 
argued that this approach differed from the release modeling 
assumptions contained in EPA's Technical Guidance for Hazards Analysis, 
which has been the basis for community emergency planning activities 
under EPCRA. Although some commenters were generally opposed to the 
concept of worst case, most of the commenters were supportive of an 
approach similar to that taken in the Technical Guidance.
    In response to these comments, EPA proposed in the SNPRM to 
redefine a worst-case scenario as the release, over a 10-minute period, 
of the largest quantity of a regulated substance resulting from a 
vessel or process piping failure. The 10-minute release time is drawn 
from the Technical Guidance for Hazards Analysis. EPA believes this 
duration is reasonable and accounts for comments arguing that an 
``instantaneous'' release is unrealistic for large-scale releases.
    EPA has decided to adopt the SNPRM approach for worst-case toxic 
vapor releases in the final rule because most of the SNPRM comments 
agreed that the redefinition is generally more credible and that the 
10-minute time frame particularly applies to vapor releases. Although 
some commenters argued that this approach still does not account for 
all process-specific conditions, EPA believes it is reasonable and 
representative of accident history. EPA notes that owners or operators 
may use air dispersion modeling techniques that better account for 
site-specific conditions, provided modeling parameters as specified in 
the rule are applied. This release scenario will apply to substances 
that are gases at ambient conditions, including those liquefied under 
pressure. Gases liquefied by refrigeration only may be analyzed as 
liquids if the spill would be contained by passive mitigation systems 
to a depth greater than 1 cm.
    Under the SNPRM, worst-case liquid spills were assumed to form a 
pool in 10 minutes, with the release rate to the air determined by 
volatilization rate. EPA recognized that this approach differs from the 
use of an instantaneous release in the Technical Guidance, which EPA 
cited as an alternative to its favored approach. The few comments 
received were divided between support of this approach and arguments 
that the 10-minute time frame was unrealistic for liquid releases 
(particularly for pipelines and connected equipment) and thus did not 
properly account for process-specific conditions.
    EPA's approach for the liquid worst-case scenario in the final rule 
is similar to the Technical Guidance methodology, in which the total 
quantity of liquid in a vessel or pipeline is instantaneously spilled 
upon failure, considering administrative controls or passive mitigation 
discussed below. The rate of release to the air is not instantaneous; 
it is determined by the volatilization rate of the spilled liquid, 
which depends on the surface area of the pool formed after the spill. 
The pool surface area is determined by assuming the spilled liquid 
rapidly spreads out and forms a one-centimeter deep pool, unless 
passive mitigation systems contain the pool to a smaller area. EPA 
believes this approach is reasonable because total vessel or pipeline 
failure will generally lead to immediate and rapid spillage followed by 
pool volatilization. Further, if the liquid were assumed to spill over 
a particular time frame rather than instantaneously, owners or 
operators would need to calculate the amount of vapor emitted to the 
air as the liquid is spilled, in addition to the volatilization rate as 
the pool spreads out and reaches its maximum size. Computer-based 
models are available for such calculations, but they are complex and 
require considerable data input to use. EPA believes that liquid 
spillage from a worst-case scenario is likely to be extremely rapid 
such that the most significant portion of the release rate is given by 
pool volatilization; consequently, liquid release time is not 
necessary. Liquid spill rates and times could be reflected in 
alternative scenarios discussed below.
    As proposed, the worst-case for flammables assumes that the total 
quantity of the substance in the vessel or pipeline vaporizes, 
resulting in a vapor cloud explosion. If the vapor cloud explosion is 
modeled using a TNT-equivalent methodology, then a 10 percent yield 
factor must be used.
    EPA requested comment in the SNPRM on whether the worst-case 
scenario should include an additional

[[Page 31682]]

amount of substance that could potentially drain or flow from process 
equipment interconnected with the failed vessel or pipeline. Many 
commenters opposed this option, suggesting that it is technically 
uncertain and would have little value in terms of what they saw as 
EPA's intended purpose for the worst-case assessment. Other commenters 
requested that ``interconnected equipment'' be defined and clarified. 
Given the assumption of rapid release associated with initial equipment 
failure, EPA agrees that determination of the spill rate from connected 
piping and equipment is likely to be technically complex, very 
different from that of the quantity in the vessel or failed pipeline, 
and likely to extend the duration of volatilization rather than 
affecting the rate overall. Therefore, EPA has not included this 
requirement in the final rule.
    EPA also sought comment in the SNPRM on options for the 
determination of the relevant quantity of regulated substance in a 
vessel or process piping for a worst-case release scenario: the maximum 
possible vessel inventory (design capacity) at any time without regard 
for operational practices and administrative controls; the maximum 
possible vessel inventory unless there are internal administrative 
controls (written procedural restrictions) that limit inventories to 
less than the maximum; or historic or projected maximum operating 
inventories without regard to administrative controls. EPA preferred 
that the maximum vessel inventory including administrative controls 
that might limit or raise the vessel quantity to be used in the worst-
case assessment and reported in the worst-case release analysis section 
of the RMP. If the quantity used in the assessment were exceeded (e.g., 
an administrative control were ignored), then the source would be in 
violation of the rule (i.e., failure to perform a worst-case analysis) 
and RMP reporting unless the administrative control was revised, the 
worst-case analysis updated to reflect any changes in the analysis, and 
a revised RMP submitted. This approach acknowledges the efforts by 
sources to increase process safety by intentionally reducing the 
inventory of regulated substances (e.g., vessels kept at half capacity 
to allow for process upsets, emergency shutdowns, and deinventorying or 
maintenance turnarounds). EPA notes that at some sources, as a result 
of inventory reduction measures, the largest quantity may be held in a 
transportation container that is loaded or unloaded at the source (See 
section P.2).
    A few commenters supported the other options, noting that 
administrative controls may fail, potentially generating a larger 
scenario. However, the majority of commenters supported EPA's preferred 
approach based on the historical reliability of such controls at many 
sources and the role that such a provision could play in encouraging 
their use at additional locations. Other commenters asked whether 
mechanical controls, alone or in combination with administrative 
controls, should be incorporated into the proposal. Although mechanical 
controls may also serve to limit the quantity, EPA has decided not to 
include them in the quantity determination for the worst-case release 
scenario because the definition for administrative control as ``written 
procedural mechanisms used for hazard control'' provides a backup for 
possible failure of mechanical controls. For more discussion of 
mechanical controls, see section III(B)(2), mitigation systems, below.
    In the SNPRM, EPA considered providing the implementing agency with 
the discretion to determine the appropriate quantity for the worst-case 
release scenario on a site-specific or industry-specific basis. EPA 
noted in the SNPRM, and most of the few comments received on this issue 
agreed, that implementing agency discretion would result in increased 
administrative burden on the implementing agency and cross-
jurisdictional differences in the methodology used for the worst-case 
analyses. EPA has decided not to incorporate this approach in the final 
rule. States, however, may impose more stringent requirements, such as 
additional modeling, under state authority.
    In the NPRM worst-case definition, EPA did not specify what 
constitutes or how to determine the worst offsite consequences. Some 
commenters indicated that without clear direction, EPA's proposed worst 
case might not actually capture the scenario that leads to the most 
severe offsite impact. In the SNPRM, EPA indicated that the worst-case 
scenario should be the scenario that generates the greatest distance to 
a specified endpoint (i.e., the toxic vapor cloud or blast wave from a 
vapor cloud explosion that travels the farthest).
    EPA recognizes that there may be other release scenarios that could 
generate a greater distance than the release from the largest vessel or 
pipeline. Consequently, EPA has added paragraph (h) to Sec. 68.25 to 
require owners or operators to consider other scenarios if those 
scenarios generate greater distances to the endpoint than the distance 
generated by the largest vessel or pipeline scenario. Owners or 
operators need to consider releases from smaller vessels if those 
vessels contain the substance at higher temperature or pressures or if 
they are closer to public receptors. In some cases, the largest vessel 
will be a storage vessel where the substance is held at ambient 
conditions. A reactor vessel may hold a smaller quantity, but at high 
pressures and temperatures, generating a release that could travel 
farther offsite to an endpoint. Vessel location is important, 
especially at large sources. A smaller vessel located nearer to the 
stationary source boundary may generate a greater impact distance than 
a larger vessel farther away. This difference may be particularly 
important for flammables, because impact distances for flammables are 
generally shorter than those for toxic releases.
2. Mitigation Systems
    a. Worst-case scenario. In the NPRM worst-case scenario, EPA 
indicated that sources must assume that both active and passive systems 
fail to mitigate the release. Commenters were generally split between 
those who wanted passive (as well as certain redundant active) 
mitigation systems to be included and those who argued that historical 
evidence from catastrophic releases suggests that the worst case should 
assume the failure of all such systems. Those who supported mitigation 
argued that inclusion provides a more credible scenario for improved 
risk communication, accident prevention, and emergency planning.
    EPA proposed in the SNPRM to include passive mitigation systems in 
the worst-case release scenario as long as the system is capable of 
withstanding, and continuing to function as intended during and after a 
destructive event, such as an earthquake, storm, or explosion, which 
causes a vessel or pipeline to fail. Passive systems such as dikes, 
catch basins, and drains for liquids, and enclosures for both liquids 
and gases, could be assumed to mitigate the release. Some commenters 
opposed this approach, arguing again that the worst case should account 
for the possibility of passive mitigation failure. The majority 
supported this approach because the assumption that passive systems 
specifically designed and installed as protection against a potential 
catastrophe fail is unrealistic. Furthermore, the approach recognizes 
and encourages prevention through additional passive mitigation and 
supports more realistic emergency

[[Page 31683]]

planning. A few commenters also suggested that active mitigation 
measures that were unlikely to fail (e.g., redundant or backup systems) 
should be considered, for similar reasons. Historical data, however, 
indicate that certain events compromise active mitigation systems 
(e.g., explosions have destroyed fire water piping systems).
    For the final rule, EPA has decided to adopt the SNPRM approach. 
Passive mitigation systems would be defined as those systems that 
operate without human, mechanical, or other energy input and would 
include building enclosures, dikes, and containment walls. EPA also 
agrees that reservoirs or vessels sufficiently buried underground are 
passively mitigated or prevented from failing catastrophically. In this 
case, sources should evaluate the failure of piping connected to 
underground storage for the worst case or alternative case scenarios. 
In addition to the requirements outlined in Sec. 68.25, EPA provides 
guidance on how passive mitigation would affect release rate and 
distance to endpoints in its RMP Offsite Consequence Analysis Guidance.
    b. Alternative scenarios. EPA initially proposed that sources could 
include passive mitigation systems in their alternative scenario 
assessments, but that active mitigation systems (e.g., excess flow 
valves, fail-safe and automatic shutdown valves, scrubbers, flares, 
deluge systems, and water curtains) would be assumed to fail. Some 
commenters generally opposed inclusion of any mitigation systems in the 
hazard assessment, while other commenters noted that the alternative 
release scenario should recognize and encourage industry accident 
prevention efforts, specifically the installation of additional 
mitigation systems, and support more realistic emergency planning.
    EPA proposed in the SNPRM to allow sources to consider passive and 
active mitigation measures in the alternative release scenario 
assessment. Commenters supported this approach and EPA has decided to 
retain it in the final rule. EPA agrees that the assumption that both 
passive and active mitigation measures fail when such measures are 
specifically designed and installed to mitigate catastrophic releases 
is unrealistic for the alternative scenarios. Although not required, 
EPA notes that sources may choose to apply passive and active 
mitigation measures to a worst-case type scenario to illustrate the 
capabilities of such systems to reduce the potential impact of a worst-
case accidental release. In addition to the requirements outlined in 
Sec. 68.28, EPA provides guidance in its RMP Offsite Consequence 
Analysis Guidance on how passive and active mitigation would affect 
release rate and distance to endpoints.
    3. Populations Affected. EPA described in the NPRM preamble certain 
locations (e.g., schools and hospitals) where sensitive populations 
might be present and proposed in the rule that owners or operators 
identify potentially exposed populations as part of the offsite 
consequence assessment. Commenters generally opposed requirements for 
population surveys; several commenters suggested that Census data or 
other readily available population information should be sufficient, 
while other commenters indicated that the LEPC or other local planning 
entities were the appropriate entity to prepare these data.
    EPA believes owners or operators need to be aware of the magnitude 
of impact on populations associated with the worst-case and alternative 
scenarios. However, EPA learned that, although much of this information 
is readily available, identification of some sensitive populations 
could require considerable effort, especially if the distance to an 
endpoint generated in the offsite consequence assessment is large or 
crosses several jurisdictions. Consequently, EPA proposed in the SNPRM 
that offsite populations be defined using available Census data; 
information on the number of children and people over 65 could be 
considered a proxy for sensitive populations, thereby accomplishing the 
same objective as the proposed rule. EPA also indicated that it has 
developed a geographic information system, LandView, that will 
facilitate analysis of resident populations. (LandView can be ordered 
from the U.S. Bureau of the Census customer service at (301) 457-4100.) 
In general, commenters agreed with the SNPRM approach. However, some 
commenters questioned the accuracy of potentially ten-year-old Census 
data and requested additional flexibility, or a greater role for local 
government, in this analysis.
    EPA has decided to adopt the approach outlined in the SNPRM for the 
final rule. Sources will be allowed to use available Census data to 
estimate populations potentially affected. Sources may update these 
data if they believe the data are inaccurate, but are not required to 
do so. Populations shall be reported to two significant digits. Because 
Census data are limited to residential populations, sources will also 
have to note in the RMP whether other, non-residential populations, 
such as schools, hospitals, prisons, public recreational areas or 
arenas, and major commercial or industrial areas, are within the 
distance to an endpoint. These institutions and areas are those that 
can generally be found on local street maps. Sources will not be 
required to estimate the number of people who might be present at these 
locations. EPA provides further guidance on the identification of 
affected populations in its RMP Offsite Consequence Analysis Guidance.
    4. Number of Scenarios In the NPRM. EPA required a worst-case 
release scenario for each regulated substance. Commenters requested 
clarification, because one substance could be present in more than one 
process at the source and sources would need to select the ``worst'' 
worst case for substances in multiple processes. In addition, one 
process may have several, similar listed substances and multiple worst-
case analyses of similar substances (e.g., flammables) would not 
provide additional useful information to the public.
    EPA proposed in the SNPRM that sources report in the RMP one worst-
case release scenario representative of all toxic substances present at 
the source and one worst-case release scenario representative of all 
flammable substances present at the source. Even though additional 
screening analyses to determine the appropriate worst-case scenario 
might be necessary, this approach reduces to a maximum of two the 
number of worst-case analyses reported in the RMP by a source. In 
general, commenters favored this approach, particularly for flammables, 
which do not produce markedly different adverse effects. A few 
commenters argued that a single toxic substance should not be 
considered representative of all toxic substances at a source, since 
there are considerable differences in toxic endpoint and adverse 
affect.
    EPA has decided to adopt the approach outlined in the SNPRM for the 
final rule: report one worst-case release scenario for all flammables 
and one worst-case release scenario for all toxics at the source. EPA 
notes that the worst-case scenario is designed principally to support a 
dialogue between the source and the community on release prevention, 
and not to serve as the sole or primary basis for local emergency 
planning. The ``worst'' worst-case release scenario will inform the 
broadest range of individuals that they may be impacted by the source 
so that they may participate in dialogue with the source about 
prevention, preparedness, and emergency response actions. Lesser worst-
case release scenarios would not

[[Page 31684]]

inform any person not already within the range of the ``worst'' worst 
case even though the health effects may be different; consequently, EPA 
believes that only a single toxic worst case is necessary. However, 
sources must also analyze and report another worst-case release 
scenario (for flammables or toxics) if such a release from another 
location at the source potentially affects public receptors different 
from those potentially affected by the first scenario (e.g., if a 
large-sized source is located between two communities and has a covered 
process adjacent to each community).
    In the NPRM, EPA did not specify the number of alternative 
scenarios to be reported for each regulated substance. EPA noted in the 
preamble that this approach, while providing flexibility, may also 
create uncertainty about what EPA will consider to be an adequate 
number of scenarios. While a few commenters argued against scenarios 
beyond the worst case, many commenters supported a requirement for a 
maximum of two: the worst case plus one additional scenario; others 
supported a maximum of three. Many of the commenters noted that local 
entities could request further information under EPCRA section 
303(d)(3) authority if they desired. At the same time, a number of 
commenters suggested that this determination should be made by the 
source based on their scenario analysis, perhaps in coordination with a 
local agency.
    In the SNPRM, EPA proposed to require one alternative release 
scenario for all flammable substances at the source and one alternative 
scenario for each toxic substance at the source. As discussed above, 
the listed flammable substances behave similarly upon release and have 
the same endpoint, while each toxic substance has a different endpoint 
and different atmospheric behavior. EPA sought comment on whether one 
toxic substance alternative scenario could represent all toxic 
substances at a source or in a process. Although commenters generally 
agreed with the approach for flammables, only a few argued that a 
single alternative scenario for all toxics was also appropriate; most 
others supported EPA's proposal.
    Upon review of the comments, EPA has decided to adopt the approach 
outlined in the SNPRM: an alternative release scenario must be reported 
in the RMP for each toxic held above the threshold at the source, and 
one alternative scenario must be reported that represents all 
flammables held above the threshold. As EPA noted in the SNPRM preamble 
and commenters echoed, the differences in the hazards posed by 
individual toxic regulated substances are significant and should be 
reflected in the alternative scenarios. This information has 
significant value for emergency planning purposes and could increase 
public interest in prevention at the source.
    5. Technical Guidance The proposed rule required sources to 
evaluate the consequences (vapor cloud dispersion, blast wave, or 
radiant heat modeling calculations) associated with the worst-case and 
alternative release scenarios. EPA did not specify a methodology or 
models, expecting that sources would have, contract for, or find the 
expertise and modeling tools needed to perform potentially complex 
modeling calculations. Because of the potential burden associated with 
this approach, EPA began working on the development of a set of simple, 
generic tools that could provide useful results and become part of the 
technical guidance for the rule. Based on its experience in developing 
the Technical Guidance for Hazards Analysis and on advice from 
commenters, EPA understands that a generic methodology depends on 
approximations to capture a wide variety of situations, will likely 
ignore site-specific conditions, and potentially may generate overly 
conservative or less realistic estimates of offsite impacts. In spite 
of these limitations, EPA believes that generic modeling tools are 
capable of supporting greater understanding of the hazards posed by 
substances and emergency planning. Commenters agreed this approach 
would reduce the burden on smaller sources unfamiliar with such 
activities as long as use of the guidance was not mandatory, and the 
guidance addressed specific industry sectors or was used as part of a 
screening process to focus resources on significant problem areas. Many 
commenters recommended that sources be given the flexibility to use any 
appropriate modeling techniques for the offsite consequence analysis to 
take advantage of expertise and to apply site-specific considerations 
to the hazard assessment. Other commenters argued that EPA should 
establish mandatory guidelines or specify certain dispersion modeling 
tools to make release scenario results more comparable across sources. 
Some commenters were concerned about the development of modeling tools 
by EPA outside of the rulemaking process and requested the opportunity 
to participate in their development.
    In the SNPRM, EPA stated it would develop a generic methodology and 
reference tables in an offsite consequence assessment guidance to 
assist sources with the analyses required by the rule. EPA believed 
that the Technical Guidance could be revised, expanded, and updated to 
address the rule requirements. The methodologies and tables would be 
subject to public review prior to publication of the final rule; once 
finalized, the tables would replace the Technical Guidance. EPA added 
that sources that wish to conduct more sophisticated modeling could do 
so, provided the techniques used account for the modeling parameters 
described in the rule. Alternatively, EPA proposed that only Program 2 
sources use the guidance; Program 3 sources would be required to 
conduct their own dispersion modeling.
    Most commenters supported the SNPRM approach, especially if sources 
were given the option to use their own site-specific modeling. Some 
commenters argued that the generic methodology and reference tables and 
the option for site-specific modeling should be applied to processes in 
all three Programs, while others suggested that they be applied only to 
a specific Program. In recognition of these comments, EPA prepared 
draft modeling methodologies and reference tables, provided an 
opportunity for their review (see 61 FR 3031, January 30, 1996), and 
has published them as the RMP Offsite Consequence Analysis Guidance. 
EPA intends to conduct peer review of the RMP Offsite Consequence 
Analysis Guidance and will revise it as appropriate. For the final 
rule, EPA will allow sources in all Programs to use the guidance or 
conduct their own site-specific modeling, provided the modeling 
techniques used account for the parameters described in the rule. For 
example, EPA's Office of Air Quality Planning and Standards has 
prepared a publicly available modeling tool called TScreen that can 
assist owners and operators with consequence assessments. EPA also 
encourages local emergency planners, fire departments, and others who 
use tools such as CAMEO/ALOHA or other modeling techniques to assist 
businesses in their community who may need help in their modeling 
efforts. EPA believes the final rule approach takes advantage of the 
broad range of expertise and modeling tools already available and will 
provide more useful results at the local level for chemical emergency 
prevention, preparedness, and response. This approach will also 
stimulate accidental release modeling research, new and existing model 
development, and model validation to generate new tools for better 
understanding of hazards and the behavior of substances in accidental 
release situations.

[[Page 31685]]

    6. Modeling Parameters. a. Endpoints. In the NPRM, EPA did not 
specify toxic or flammable substance endpoints that must be used in the 
offsite consequence assessment modeling. Most commenters recommended 
that EPA specify endpoints to provide a consistent basis for modeling; 
many favored the use of existing standards or guidelines, primarily the 
emergency response planning guidelines (ERPGs) developed by the 
American Industrial Hygiene Association for toxic substances. For 
flammables, commenters suggested overpressure, heat radiation, and 
explosion or flammability limits. In addition to other specific 
standards, a few commenters recommended a hierarchy of values if 
certain levels for some chemicals were not available.
    In the SNPRM, EPA indicated that it would select one endpoint for 
each toxic substance for use in the offsite consequence assessment 
methodology and sought comment on whether it should use a single 
endpoint to the extent possible (e.g., the Immediately Dangerous to 
Life and Health (IDLH) value developed by the National Institute for 
Occupational Safety and Health (NIOSH), unless one does not exist for a 
substance), or a hierarchy of endpoints (e.g., ERPGs; if one does not 
exist, then the IDLH; and finally toxicity data if no other value is 
available). EPA also asked whether overpressure or both overpressure 
and radiant heat effects should be used for flammable substance 
endpoints. Some commenters supported the use of ERPG values for the 
toxic substance endpoint, or a hierarchy of values beginning with the 
ERPG. Others opposed IDLH or the IDLH divided by 10 for technical 
reasons.
    EPA agrees with commenters that one toxic endpoint should be set 
for each substance. The endpoint for each listed toxic substance is 
provided in Appendix A to the final rule. The endpoint, applicable 
whether the source uses the EPA guidance or conducts site-specific 
modeling described below, is the AIHA ERPG-2 or, if no ERPG-2 is 
available, the level of concern (LOC) developed for the Technical 
Guidance, corrected where necessary to account for new toxicity data. 
The LOCs that were based on IDLHs have been updated only if the IDLHs 
were revised between the original LOC listing in 1987 and the 1995 IDLH 
revisions. The most recent IDLH revisions were not used because they 
are based on a methodology that EPA has not reviewed; the previous IDLH 
methodology was reviewed by EPA's Science Advisory Board for use as 
LOCs. EPA chose the ERPG-2 first because ERPGs are subject to peer 
review and are specifically developed by a scientific committee for 
emergency planning to protect the general public in emergency 
situations. The ERPG-2 represents the maximum airborne concentration 
below which the committee judges that nearly all individuals could be 
exposed for up to an hour without experiencing or developing 
irreversible or other serious human health effects or symptoms that 
could impair their ability to take protective action. EPA rejected the 
ERPG-3, which is a lethal exposure level, because it is not protective 
enough of the public in emergency situations. About 30 listed toxic 
substances have ERPGs. EPA chose to use LOC levels for substances with 
no ERPG because LOCs have been peer reviewed by EPA's Science Advisory 
Board, they are intended to be protective of the general public for 
exposure periods of up to an hour, they are widely used by the 
emergency response planning community, and, for a majority of the 
listed toxic substances, there are no acceptable alternatives. EPA 
notes that, for substances with both values, the LOC is comparable to, 
and in some cases is identical to, the ERPG-2.
    EPA recognizes potential limitations associated with the ERPG and 
LOC and is working with other agencies to develop Acute Exposure 
Guideline Limits (AEGLs). See Establishment of a National Advisory 
Committee for Acute Exposure Guideline Levels (AEGLs) for Hazardous 
Substances, (60 FR 55376; October 31, 1995). When these values have 
been developed and peer-reviewed, EPA intends to adopt them, through 
rulemaking, as the toxic endpoint for substances under this rule.
    As proposed, vapor cloud explosion distances will be based on an 
overpressure of 1 psi, and for analysis of worst-case releases, a yield 
factor of 10 percent. Yield factors (the percentage of the available 
energy released in the explosion process) can vary considerably. EPA 
selected 10 percent to generate conservative worst-case consequences. 
For flammables, EPA selected a radiant heat exposure level of 5 kW/
m2 for 40 seconds as recommended by the commenters, and, for vapor 
cloud fire and jet fire dispersion analysis, the lower flammability 
limit (LFL) as specified by NFPA or other recognized sources.
    b. Meteorology. In the NPRM, EPA proposed that sources model the 
downwind dispersion of the worst-case release scenario using an F 
atmospheric stability class and 1.5 m/s wind speed and model the 
alternative release scenarios using both the worst-case conditions and 
the meteorological conditions prevailing at the source. EPA did not 
revise the meteorological assumptions in the SNPRM.
    Several commenters argued that the worst-case meteorological 
conditions were too conservative or not applicable on a national basis 
and that site-specific conditions should be used, while others agreed 
that for worst case, minimum wind speeds and the most stable 
atmospheric conditions should be used. In the final rule, EPA has 
decided that sources must conduct worst-case dispersion modeling using 
an F atmospheric stability class and a 1.5 m/s wind speed. A higher 
wind speed or less stable atmospheric stability class may be used if 
the owner or operator has local meteorological data applicable to the 
source that show that the lowest recorded wind speed was always greater 
or the atmospheric stability class was always less stable during the 
previous three years.
    In the final rule, EPA also requires sources to conduct alternative 
release scenario dispersion modeling using the typical meteorological 
conditions applicable to the source. If meteorological data are not 
available, typical conditions in the RMP Offsite Consequence Analysis 
Guidance may be used. EPA believes typical meteorological conditions 
should be used to generate realistic hazard assessments for 
communication with the public and first responders and for emergency 
planning.

C. Consideration of Environmental Impact

    The issue of whether and how environmental impacts should be 
addressed in the hazard assessment and the rule in general drew 
considerable comment. The comments divide into three questions: Should 
EPA consider environmental impacts from accidental releases? If so, 
which environments should be identified? What constitutes an 
environmental impact?
    1. Inclusion of Environmental Impacts. Environmental groups argued 
that the CAA requires assessment of potential impacts to the 
environment and that the environmental receptors listed in the SNPRM 
should be broadened. One commenter stated that since the CAA Amendments 
of 1990 strengthened limits of continuous air toxic emissions, wildlife 
is now threatened more by accidental releases. However, the majority of 
commenters on this issue, principally industry groups, opposed 
consideration of the environment because it is adequately protected by 
other environmental statutes, environmental protection in section 
112(r) relates only to emergency

[[Page 31686]]

response, and Congress intended in section 112(r) for the environment 
to be addressed only to the extent that human health is protected. 
Several commenters argued that flammable substances were unlikely to 
generate environmental impacts. Commenters also stated that many 
industries have voluntarily developed nature reserves around their 
sources, often at the urging of government agencies. Additional 
regulations based on ``environmental'' impact consideration would 
``penalize'' these sources for their efforts. Finally, two commenters 
noted that EPA's endpoints are based on acute human effects; applying 
these to the environment may not be valid.
    EPA disagrees that section 112(r) was not intended to protect the 
environment as well as human health. Although section 112(r)(5) links 
the threshold quantity to human health, section 112(r)(3) requires EPA 
to select substances that could impact human health and the 
environment. EPA agrees that the only time sections 112(r)(7)(B)(I) and 
(ii) mention protection of the environment is in conjunction with 
emergency response; however, this is also true for protection of human 
health. Congress did not intend to limit concern about either impact 
strictly to emergency response procedures; Congress may not have 
mentioned either impact relative to prevention because the act of 
preventing an accident eliminates the impact on both. When accidents 
occur, human health and the environment need protection. By mentioning 
both impacts in the response or post accident phase, Congress was 
stressing its concern for the environment as well as human health. 
Given the integrated nature of the RMP, it would be an inappropriately 
narrow reading of CAA section 112(r)(7)(B) to say environmental impacts 
must be ignored in hazard assessments and in the design of the 
prevention program, but must be accounted for in emergency response. In 
addition, section 112(r)(9) provides authority for EPA to take 
emergency action when an actual or threatened accidental release of a 
regulated substance may cause imminent and substantial endangerment to 
human health, welfare, or the environment. Clearly, section 112(r)(9) 
allows EPA to take action to prevent, as opposed to simply respond to, 
accidental releases to protect the environment. Because section 
112(r)(7) is intended to prevent situations that could lead to 
emergency orders under section 112(r)(9), it is logical to conclude 
that Congress meant EPA to develop regulations that would prevent 
accidental releases that could cause environmental damage. Although the 
consequences may not be precisely known, EPA believes that impacts 
could occur at environmental receptors located within the distance to a 
human acute exposure endpoint associated with a worst-case or 
alternative scenario because wildlife may be more sensitive or require 
less exposure to cause an adverse effect than humans.
    2. Environmental Receptors to Be Considered. In the SNPRM, EPA 
proposed that sources report in their RMP which sensitive environments 
listed by the National Oceanographic and Atmospheric Administration 
(NOAA) for the Clean Water Act are within the distance determined by 
the worst-case or alternative case scenario. A few commenters argued 
that the list should include state and local level analogues to Federal 
entities (e.g., state parks), all surface waters that are fishable or 
swimmable or supply drinking water, and ground water recharge areas. 
Many commenters opposed the NOAA list, arguing that the list is 
extremely broad, covers millions of acres in primarily rural areas, and 
contains areas that are difficult for both the regulated community and 
the government to clearly identify (e.g., habitat used by proposed 
threatened or endangered species, cultural resources, and wetlands). 
They stated that the NOAA list is not appropriate for this rule because 
it represents guidance applicable to offshore sources, and to a limited 
number of very large onshore sources, that could have catastrophic oil 
spills. A few commenters suggested limiting the list to Federal Class I 
areas designated under the CAA prevention of significant deterioration 
program, or reducing the list of sensitive areas to national parks and 
the designated critical habitat for listed endangered species, and 
limiting environmental concern to those accidents that generate a 
significant and long-term impact, such as an actual ``taking'' of an 
endangered species.
    For the final rule, EPA has not used the NOAA list. Instead EPA 
requires owners or operators to indicate in the RMP the environmental 
receptors located within circles whose radii are the distances to an 
endpoint for the worst-case and alternative release scenarios. EPA 
agrees with commenters that the locations of certain natural resources 
are difficult to identify. Consequently, EPA has defined environmental 
receptors as natural areas such as national or state parks, forests, or 
monuments; officially designated wildlife sanctuaries, preserves, 
refuges, or areas; and Federal wilderness areas, that can be exposed to 
an accidental release. All such receptors typically can be found on 
local U.S. Geological Survey (USGS) maps or maps based on USGS data. 
Habitats of endangered or threatened species are not included because 
the locations of these habitats are frequently not made public to 
protect the species. Natural resource agencies will have access to the 
RMP information and can raise concerns with local officials about 
potential harm to these habitats, as necessary. Local emergency 
planners and responders may want to consult with environmental 
management agencies as part of emergency preparedness.
    3. Level of Analysis Required. In the SNPRM, EPA proposed that 
sources only identify sensitive environments within the area of the 
worst-case release, rather than analyzing potential impacts. A few 
commenters opposed this approach, stating that the CAA requires that 
sources analyze impacts. Most commenters supported EPA's position 
because extensive expertise at considerable cost is required to 
adequately assess all environmental impacts associated with the 
environments list EPA provided. Commenters stated that this cost would 
make fewer resources available for prevention activities and providing 
no benefit. Other commenters noted that much of the data needed for 
such analyses is not available.
    EPA agrees that extensive environmental analysis is not justified. 
Irreversible adverse effect exposure level data for the wide variety of 
environmental species potentially exposed in an accidental release 
event are not available for most of the listed substances. EPA believes 
that identification of potentially affected environmental receptors in 
the RMP is sufficient for purposes of accident prevention, 
preparedness, and response by the source and at the local level.

D. Program 3 Consistency with OSHA PSM Standard

    1. Prevention Program. In EPA's original proposal, the prevention 
program requirements were based on the elements of OSHA's PSM standard 
(29 CFR 1910.119), and some commenters supported this approach. But EPA 
added a paragraph to each OSHA prevention program element to explain 
the purpose of the provision and, in some instances, added additional 
recordkeeping, reporting, or substantive provisions to ensure that 
statutory requirements were met. Several commenters argued that these 
additions cause confusion and appear to require sources to create two 
separate

[[Page 31687]]

prevention programs, which could cause conflicting inspection and 
enforcement actions and greater cost for sources that must comply with 
both the OSHA and EPA requirements. Many commenters suggested that EPA 
simply reference the OSHA requirements.
    EPA agrees that the Program 3 prevention program requirements 
should be identical to OSHA's PSM standard to avoid confusion and 
redundant requirements and to ensure that sources develop one 
accidental release prevention program that protects workers, the 
general public, and the environment. Therefore, EPA has moved the 
Management System requirement (see section I.D) supported by most 
commenters to a section separate from the Prevention Program and 
deleted the introductory paragraphs and modifications to the PSM 
language. The Agency recognizes that many workplace hazards also 
threaten public receptors and that the majority of accident prevention 
steps taken to protect workers also protect the general public and the 
environment; thus, a source owner or operator responsible for a process 
in compliance with the OSHA PSM standard should already be in 
compliance with the Program 3 prevention program requirements.
    EPA did not cross-reference sections of the PSM standard in today's 
rule because, under Office of Federal Register requirements at 1 CFR 
21.21(c)(2), EPA cannot adopt OSHA's requirements. EPA and OSHA have 
separate legal authority to regulate chemical process safety to prevent 
accidental releases. Furthermore, cross-referencing the OSHA standard 
would be tantamount to a delegation of authority to set standards in 
this area from the Administrator of EPA to the Secretary of Labor, 
because OSHA would be able to modify the PSM requirements without an 
EPA rulemaking under CAA Sec. 307(d). The Senate explicitly considered 
and rejected the possibility of the Administrator delegating to OSHA 
responsibility for hazard assessment. Senate Report at 226. As that 
term was used in the Senate bill, hazard assessment included many of 
the elements of PSM.
    With the exception of some key terms and phrases, the Program 3 
prevention program language in the final rule is identical to the OSHA 
standard language (the rulemaking docket contains a side-by-side 
analysis of the OSHA standard and EPA rule text with word differences 
highlighted). Most of the differences are terms based on specific 
legislative authorities given to OSHA or EPA that have essentially the 
same meaning:

------------------------------------------------------------------------
               OSHA term                             EPA term           
------------------------------------------------------------------------
Highly hazardous substance.............  Regulated substance.           
Employer...............................  Owner or operator.             
Facility...............................  Stationary source.             
Standard...............................  Rule or part.                  
------------------------------------------------------------------------

    EPA also agrees with commenters that sound process safety 
management systems ideally address chemical accident prevention in a 
way that protects workers, the public, and the environment. Since 
OSHA's responsibility is to protect workers, there are phrases in the 
OSHA standard that are designed to focus employer attention on 
accidents that affect the workplace. It could be argued that these 
phrases inadvertently exclude consideration of offsite impacts. EPA has 
deleted the phrases noted below to ensure that all sources implement 
process safety management in a way that protects not only workers, but 
also the public and the environment:

------------------------------------------------------------------------
          OSHA PSM requirement              EPA program 3 requirement   
------------------------------------------------------------------------
1910.119(d)(2)(E) An evaluation of the   68.65(c)(1)(v) An evaluation of
 consequences of deviations, including    the consequences of           
 those affecting the safety and health    deviations.                   
 of employees.                                                          
1910.119(e)(3)(ii) The identification    68.67(c)(2) The identification 
 of any previous incident which had a     of any previous incident which
 likely potential for catastrophic        had a likely potential for    
 consequences in the workplace.           catastrophic consequences.    
1910.119(e)(3)(vii) A qualitative        68.67(c)(7) A qualitative      
 evaluation of a range of the possible    evaluation of a range of the  
 safety and health effects of failure     possible safety and health    
 of controls on employees in the          effects of failure of         
 workplace.                               controls.                     
1910.119(m)(1) The employer shall        68.81(a) The owner or operator 
 investigate each incident which          shall investigate each        
 resulted in, or could reasonably have    incident which resulted in, or
 resulted in a catastrophic release of    could reasonably have resulted
 a highly hazardous chemical in the       in a catastrophic release of a
 workplace.                               regulated substance.          
------------------------------------------------------------------------

    EPA also made changes to specific schedule dates to coordinate with 
the OSHA PSM requirements, made internal references consistent, and 
added a provision to the PHA section specifically grandfathering all 
OSHA PHAs and allowing sources to update and revalidate these PHAs on 
their OSHA schedule. EPA believes these modifications do not cause 
source owners or operators to make major adjustments to their PSM 
systems established under OSHA. These minor modifications ultimately 
lead to the development of one comprehensive process safety management 
system satisfying both OSHA and EPA that works to prevent accidents 
affecting workers, the public, and the environment.
    EPA also modified the OSHA definition of catastrophic release, 
which serves as a trigger for an accident investigation, to include 
events ``that present imminent and substantial endangerment to public 
health and the environment.'' This modification, in combination with 
the changes noted above, ensure that sources covered by both OSHA and 
EPA requirements must investigate not only accidents that threate
FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
n 
workers, but also those that threaten the public or the environment. 
EPA agrees with commenters and recognizes that most catastrophic 
accidental releases affect workers first. However, the Agency also 
believes that there are accidental release situations where workers are 
protected but the public and the environment are threatened, e.g. 
vessel overpressurizations that cause emergency relief devices to work 
as designed and vent hazardous atmospheres away from the workplace and 
into the air where they are carried downwind. Although many sources 
through the PHA process will have recognized and addressed the 
potential impact offsite associated with safety measures that protect 
workers (e.g. an

[[Page 31688]]

emergency vent scrubber system), EPA believes that the requirements in 
today's rule ensure that all sources routinely consider such 
possibilities and integrate the protection of workers, the public, and 
the environment into one program.
    2. Enforcement. Many commenters expressed concern for conflicting 
audit procedures, interpretations, and enforcement actions when EPA and 
OSHA auditors inspect the same processes. EPA has no authority to 
exempt a source covered under the PSM standard and today's rule from 
any prospect of an EPA enforcement action for violations of section 
112(r) and EPA regulations issued under it. EPA and OSHA are working 
closely to ensure that enforcement actions are based on consistent 
interpretations and coordinated to avoid overlapping audits. Such 
coordination in enforcement was recognized as an appropriate method for 
exercising the Administrator's duty to coordinate the EPA program with 
OSHA (Senate Report at 244).
    3. Exemptions. Many commenters suggested that the Agency exempt 
small businesses or certain industry sectors because the rule is too 
costly, some industries are already subject to substantial regulation 
by other Federal or state agencies, OSHA exempts certain industries 
from the PSM standard, and some sources have effective self-policing 
regimes in place.
    Regardless of whether the source is covered under some other 
Federal, state, or local program, EPA has no authority to exempt a 
source that has more than a threshold quantity of a regulated substance 
from complying with the risk management program rule (CAA section 
112(r)(7)(B)(ii)). EPA established the tiered approach to acknowledge 
that different industries pose different potential risks to human 
health and the environment and that elements of other regulatory 
programs may serve to prevent accidents. EPA believes that owners or 
operators can indicate in their Program and RMP how compliance with 
other particular regulations and standards satisfies Program or RMP 
elements, thereby, avoid duplication. Only those processes in certain 
SIC codes or covered by OSHA's PSM standard must implement the full PSM 
program under Program 3. A source owner or operator can demonstrate 
compliance with the Program 2 or 3 prevention program under today's 
rule for a covered process by showing that it complies with the PSM 
standard. This approach is consistent with the authority to set 
different standards for different types of sources under CAA section 
112(r)(7)(B)(I).

E. Relationship to Air Permitting

    Several commenters on the NPRM requested that EPA clarify the 
relationship between the risk management program and the air permit 
program under Title V of the CAA for sources subject to both 
requirements. In the SNPRM, EPA indicated that in Title V, section 
502(b)(5)(A), Congress clearly requires that permitting authorities 
must have the authority to ``assure compliance by all sources required 
to have a permit under this title with each applicable standard, 
regulation or requirement under this Act.'' EPA further states in part 
70.2 that ``Applicable Requirement means * * * (4) Any standard or 
other requirement under section 112 of the Act, including any 
requirement concerning accident prevention under section 112(r)(7) of 
the Act; * * *'' Consequently, EPA must require that air permitting 
authorities implementing Title V permit programs be able to assure 
compliance with section 112(r). In the SNPRM, EPA attempted to identify 
the section 112(r) ``applicable requirements,'' clarify the minimum 
content of part 70 permits with respect to these requirements, and to 
specify the role and responsibilities of the part 70 permitting 
authority in assuring compliance with these requirements.
    The sections below address the major issue areas raised by 
commenters on the SNPRM. More detail can be found in the Risk 
Management Program Rule: Summary and Response to Comments in the 
Docket. The SNPRM also addressed the role and responsibilities of the 
implementing agency with respect to section 112(r). This issue is 
addressed separately in Section R below.
    1. General relationship between the part 68 and air permitting 
programs. Some commenters agreed with EPA's proposed role for the air 
permitting authority with respect to section 112(r), but encouraged EPA 
to avoid new, confusing, and duplicative state and source permitting 
requirements. A few commenters suggested that all part 68 requirements 
should become permit conditions, that it be fully enforced through the 
part 70 permitting program, and that anything less violates the CAA. 
Most commenters (state air permitting authorities and industry), 
opposed EPA's proposal stating that Congress did not intend, and 
legislative history does not support, section 112(r) to be implemented 
or enforced through the Title V permit program.
    EPA agrees that Congress did not intend for section 112(r) to be 
implemented and enforced primarily through Title V and recognizes the 
potential for confusion and burden on sources and air permitting 
authorities associated with section 112(r). EPA believes that the 
requirements in today's rule are flexible, impose minimal burden, 
address the concerns raised by commenters and satisfy the CAA 
requirement for assurance of compliance with section 112(r) as an 
applicable requirement for permitting. The requirements apply only to 
sources subject to both part 68 and parts 70 or 71; there are no 
permitting requirements on sources subject solely to part 68. EPA 
agrees that ideally, one authority should implement part 68 oversight; 
however, air permitting authorities should not be responsible for 
implementation just as implementing agencies should not be responsible 
for permitting (see implementing agency discussion in Section R, 
below). The air permitting authority has the flexibility under today's 
rule to obtain assistance, expertise or resources from other agencies 
in fulfilling its responsibilities with respect to section 112(r). This 
will foster interaction and coordination of air pollution, pollution 
prevention, public and worker safety and health and environmental 
programs at the state and local levels leading to more effective 
oversight.
    2. Impact of EPA's proposal on air permitting programs. Several 
commenters stated that EPA's proposal places an unreasonable burden on 
air permitting programs because states would need to amend or develop 
new legislative authority and implementing regulations which diverts 
limited state resources away from the development and operation of more 
important routine emissions permit programs.
    EPA disagrees that today's rule places an unreasonable burden on 
air permitting programs. Part of the approval process for a state air 
permitting program is confirmation that states have the authority to 
ensure that sources are in compliance with air toxics requirements 
under section 112 including section 112(r). The provisions of section 
68.215 are sufficient to meet the obligations under part 70. Thus, for 
state and local agencies that have approved part 70 programs, states 
would need to develop new legislative authorities only if they seek 
delegation to implement part 68 beyond the narrow responsibilities 
provided in Sec. 68.215 (see Section R, below). State obligations under 
Sec. 68.215, which should be covered by permit fees (see section E.11, 
below), should not impose a substantial burden on state resources 
because the rule streamlines the RMP requirements and establishes 
centralized recordkeeping for RMPs.

[[Page 31689]]

    3. Part 68 as an ``applicable requirement'' under part 70. As 
described above, the CAA requires that air permitting authorities 
ensure that sources are in compliance with applicable requirements as a 
condition of permitting. In the preamble of previous rulemakings for 
part 70 (57 FR 32301), EPA indicated that the definition of 
``applicable requirement'' under Title V includes ``any requirement 
under section 112(r) to prepare and register a risk management plan 
(RMP).'' This explanatory statement preceded development of part 68, 
which implements section 112(r)(7). In the SNPRM, EPA proposed more 
specific provisions to assure compliance with applicable requirements 
for section 112(r) than the part 70 preamble so that air permitting 
authority responsibility is clear. EPA believed that all elements of 
part 68 are applicable requirements; however, compliance with 
applicable requirements could be assured by including generic terms in 
permits and certain minimal oversight activities. Together, these steps 
ensure that permitted sources fulfill their accident prevention and 
information sharing responsibilities.
    EPA proposed standard permit conditions that would allow air 
permitting authorities to verify compliance with part 68. Commenters 
stated that alteration of the part 70 rule definition of the term 
`applicable requirement' under the part 68 rulemaking is inappropriate 
and that the role of the air permitting authority with respect to 
section 112(r) should be defined in part 70 rulemakings rather than in 
part 68.
    EPA's action today does not alter the definition of ``applicable 
requirements'' under 40 CFR 70.2, which already includes ``any 
requirement concerning accident prevention under section 112(r)(7).'' 
Rather, EPA is establishing very simple permit terms and flexible, 
minimal oversight responsibilities that will assure compliance with 
part 68. EPA disagrees that part 68 cannot establish more specific 
terms for permits than those given in part 70 or 71 with respect to 
section 112(r). As mentioned in the SNPRM preamble, part 70 does not 
preclude EPA from clarifying or even expanding air permitting 
responsibilities. Specific permit requirements are useful to clearly 
establish the minimum permit conditions and state responsibilities 
essential to ensuring compliance with part 68 and to reduce 
uncertainties that may lead to overly broad interpretations of the 
requirements. However, air permitting authorities still have the 
flexibility to establish additional terms for the permit if it so 
chooses.
    4. Role of the air permitting authority. In the SNPRM, EPA proposed 
certain air permitting authority responsibilities necessary to ensure 
that sources are in compliance with part 68 for purposes of permitting. 
Commenters stated that the role of the Title V permitting authority 
should be defined in part 70, not in part 68 and opposed EPA's proposal 
arguing that it causes unnecessary confusion for sources. Commenters 
also argued that air permitting authorities do not have the relevant 
expertise needed and that states should have the flexibility to 
implement risk management programs in whichever agency they see fit. 
Other commenters argued that air permitting authorities, without 
section 112(l) delegation, could not accept the responsibilities 
assigned by the SNPRM and that EPA was unlawfully attempting to 
delegate the responsibility for implementing section 112(r) to the 
state permitting authorities. Several commenters believed the 
permitting authority should have no responsibilities beyond those set 
forth in EPA's April 13, 1993, policy memorandum from John Seitz, 
Director of the Office of Air and Quality Planning and Standards 
(OAQPS), to EPA Regional Air Division Directors, available in the 
docket because states invested significant resources and effort into 
the development of their programs, guided by this EPA memorandum. 
However, a state permitting authority stated that the EPA memorandum 
did not account for many of the key program elements, including the 
necessary incorporation of standard permit conditions. Many commenters 
also opposed requiring extensive details or all aspects of part 68 
compliance in the permit, finding this approach excessive and overly 
burdensome on both state air permitting authorities and sources and 
contrary to the law and Congressional intent in that it would have 
required section 112(r)(7) to be fully implemented by state permit 
programs.
    Several commenters were concerned that a single violation of part 
68 could potentially be enforced by both the permitting authority and 
the implementing agency. One commenter suggested that the only case 
where a violation of a part 68 requirement should also be considered a 
violation of part 70 would be the failure to register an RMP on time 
under the requirements of Sec. 68.12. Another commenter requested that, 
at Sec. 68.58(b)(3), EPA should allow the state the discretion to 
determine whether a penalty should be assessed. Several commenters, 
uncertain how the Programs proposed by EPA in the SNPRM would affect 
the role of the permitting authority, suggested that EPA develop a 
process to inform states of the tiering approach and to exclude Program 
1 and 2 sources from additional permitting requirements.
    EPA believes that part 68 should more clearly define the role of 
the air permitting authority with respect to section 112(r). Part 70 
requirements were established well before part 68 and are therefore 
vague. Consequently, EPA is using part 68 to clarify the applicable 
requirements, to specify permit terms and to establish the minimum 
permit conditions and activities to avoid misinterpretations and to 
ensure compliance with part 68. EPA agrees that air permitting 
authorities may not have the expertise necessary with respect to part 
68; consequently, the requirements in today's rule only specify the 
actions the state must take to assure that sources have met their part 
68 responsibilities while giving the state flexibility to assign or 
designate by agreement entities other than the permitting authority to 
carry out these activities. The elements in today's rule are the 
minimal components of a successful compliance program; anything less 
falls short of the statutory requirements of assuring compliance with 
all applicable requirements. EPA also disagrees that it is forcing 
delegation on air permitting authorities to implement section 112(r). 
As described in the SNPRM and above, air permitting authorities must 
ensure that sources are in compliance with applicable requirements for 
purposes of permitting. This is not section 112(r) implementation (see 
section R below). EPA is merely specifying more clearly the 
requirements already upon air permitting authorities; without the 
specification given in today's rule, it could be argued that air 
permitting authorities are obligated to review and evaluate the 
adequacy of RMP submissions. EPA agrees that oversight of the adequacy 
of part 68 compliance, including RMPs, is not an appropriate activity 
for the air permitting authority and is more appropriately an 
implementing agency duty. Delegation of these implementing agency 
activities can only be accomplished through a delegation consistent 
with part 63, subpart E.
    EPA also maintains that the air permitting authority role should be 
more specifically defined than that offered by the April 13, 1993, 
memorandum. The April 1993 policy was prepared prior to the NPRM and 
SNPRM, it does not account for implementation of the risk management 
program by the source (as opposed to

[[Page 31690]]

implementation of the plan), and there is no mechanism, such as a 
review of the RMP by the permitting authority, to ensure that the plan 
contains the elements required by part 68. These deficiencies were 
previously indicated by EPA in a June 24, 1994, memorandum from John 
Seitz and Jim Makris, Director of the Chemical Emergency Preparedness 
and Prevention Office (CEPPO) to EPA Regional Division Directors, which 
stated that ``approval criteria in the April 13 memorandum may not be 
sufficient to ensure compliance with all `applicable requirements' 
established'' in the risk management program rule. EPA acknowledges 
that states may have invested considerable resources and effort in 
development of air permitting programs based on the April 13, 1993 
policy. However, EPA also believes that the minimum requirements and 
flexibility offered by today's rule allow air permitting authorities to 
fold these activities into their programs with minimal burden. EPA 
recognizes that there may be multiple agency oversight related to 
permitting and part 68. As mentioned above, today's rule allows the air 
permitting authority the flexibility to use other agencies, such as the 
implementing agency or a designated agency (upon agreement), to better 
coordinate at the state and local level. In addition, EPA must note 
that there is no `approval' of either initial or revised RMP 
submissions.
    EPA agrees that requiring the permit to contain extensive details 
of part 68 compliance goes well beyond the need for part 70 permits to 
assure compliance with applicable section 112(r) requirements and it 
would impose considerable resource and expertise burdens on the 
permitting authority. EPA has maintained that it is not appropriate to 
include risk management program elements as permit conditions since 
these elements will be highly source-specific and subject to change as 
the source develops and implements its programs.
    While enforcement would primarily occur using part 68 authority, 
EPA agrees that the permitting authority also has the authority to 
pursue violations under part 70 and sources could be subject to 
multiple violations. This is no different from any other standard 
promulgated by EPA that becomes an applicable requirement for 
permitting. EPA agrees that the air permitting authority has the 
discretion to coordinate with the implementing agency with respect to 
penalty assessment associated with Sec. 68.58(b)(3) in the SNPRM 
(Sec. 68.215(e)(4) under today's rule).
    Finally, the tiering (Program) approach benefits sources as well as 
air permitting authorities. EPA has simplified the tiering provisions 
so sources and air permitting authorities should be able to readily 
determine the Program requirements each process must satisfy, leading 
to more effective oversight. EPA has also streamlined the RMP reporting 
requirements and is working on electronic submission of RMP information 
which serve to reduce the burden on air permitting authorities and 
implementing agencies.
    5. Title V permit application contents. Many commenters stated that 
sources regulated under parts 70 or 71 and part 68 should only be 
required to certify whether they are subject to section 112(r) in their 
initial permit application to allow timely processing. Although EPA 
indicated that it did not want the RMP included in permit applications 
or in the permit, many commenters stated their opposition because the 
additional time required for RMP review could delay permit grants and, 
in some states, the RMP could be included in the source's permit. 
Several commenters suggested that the air permitting authority should 
decide whether it wants the RMP; one commenter stated that sources 
would have a significant incentive to comply with such a request, given 
the permitting authority's ability to withdraw an application shield. 
Others stated that the permitting authority should be prohibited from 
asking for the RMP as part of the permit application.
    As EPA has indicated, the RMP should not be submitted with the 
permit application or made part of the permit. EPA is working to 
streamline permit application requirements and has indicated that the 
minimum with respect to section 112(r) is a ``check box'' for the 
source to note whether it is subject to section 112(r), and either 
certification that the source is in compliance with part 68 or has a 
plan for achieving compliance. Any other requirements are up to the air 
permitting authority. All sources will be required to submit their RMP 
to a central point to be specified by EPA and will be immediately 
available to local responders and the state which may elect to make it 
available to air permitting authorities.
    6. Air permit contents. EPA proposed in the SNPRM that each permit 
contain standard conditions that address key compliance elements in 
part 68 and mechanisms for compliance plans, certifications and 
revisions. Although EPA indicated it did not believe the RMP should be 
part of the permit, two commenters suggested that it should be included 
while most others indicated that it should not or that the air 
permitting authority should decide. Several commenters supported no 
more than the four conditions proposed in the SNPRM while others 
suggested requirements including: prompt development and updating of a 
complete RMP; no conditions other than an indication that a source is 
subject to part 68; provisions stating the need to register according 
to Sec. 68.12; a condition stating that the source will comply with all 
part 68 requirements; and a standard provision recognizing that the 
implementing agency has the section 112(r) enforcement authority.
    Except for the provisions of Sec. 68.215(a), EPA does not believe 
that the RMP or all or any portion of the remainder of part 68 should 
become permit conditions because the RMP and part 68 elements will be 
highly source-specific and subject to frequent change introducing 
unnecessary complexity and delaying permit implementation. The 
provisions of Sec. 68.215 should allow the air permitting authority to 
implement the conditions in a standardized way across many sources with 
minimal burden. EPA has revised Sec. 68.215 to require that all permits 
contain a statement listing part 68 as an applicable requirement and 
that conditions shall be added that require the source to submit a 
compliance schedule for meeting the requirements of part 68 or, as part 
of the compliance certification all permitted sources must submit under 
40 CFR 70.6(c)(5), a certification statement that, to the best of the 
owner or operator's knowledge, the source is in compliance with all 
requirements of this part, including the registration and submission of 
the RMP. EPA had amended the authority citation for part 68 to include 
CAA Title V because EPA is promulgating permit terms and oversight 
duties. Consistent with parts 70 and 71, the permit shield provisions 
of parts 70 and 71 would not apply to the substantive requirements of 
part 68 because the detailed substantive requirements of part 68 are 
not addressed in the Title V permit or permit application. If a permit 
without these conditions has already been issued, then when the permit 
comes up for renewal under part 70 or 71 requirements (40 CFR Part 
70.7), the owner or operator shall submit an application for a revision 
to its permit to incorporate these conditions. The suggested 
alternative conditions, not adopted, generally help assure compliance 
only with portions of part 68, such as registration or the preparation 
of the RMP, or omit critical

[[Page 31691]]

information, such as whether the source is subject to part 68 or what 
its compliance status is. The implementing agency's enforcement 
authority is apparent on the face of the CAA.
    7. Completeness review. As part of ensuring compliance, EPA 
proposed in the SNPRM that within a certain time-frame the air 
permitting authority must verify that an RMP containing the required 
elements had been submitted and indicated in the preamble that it would 
assist air permitting authorities by developing a checklist. EPA stated 
that this review is independent of completeness reviews required for 
permit applications to avoid interfering with the permit process. 
Further, air permitting authorities could arrange for other agencies, 
including the implementing agency, to perform the completeness review. 
EPA also requested comment on whether the permitting authority should 
be able to require sources to make revisions to an RMP.
    Most commenters disagreed with this proposal arguing that if a 
completeness check is necessary, it should be performed by the 
implementing agency since most air permitting authorities will not have 
the technical expertise (e.g., chemical process safety) required to 
adequately review RMPs for technical completeness. Commenters also 
argued that a completeness review would be merely procedural, it 
duplicates effort without creating any real benefit, it consumes scarce 
resources, and it leads to inconsistent RMP review without ensuring the 
source is in compliance with risk management program requirements. Some 
commenters suggested that the completeness review could be better 
defined only as a review of source self-certification that a complete 
RMP was submitted rather than a substantive review. Some commenters 
generally agreed that completeness checks should be completed within 
sixty days. Finally, most commenters argued that only the implementing 
agency should be able to require revisions to the RMP. Otherwise, 
another revision review, appeal and verification process would be 
necessary, duplicating the process already established for the 
implementing agency.
    Based on these comments, EPA has decided not to require that air 
permitting authorities perform a completeness check as part of the 
verification of compliance with part 68. EPA has modified the rule 
requirements so that the air permitting authority may select for itself 
one or more appropriate mechanisms (such as source audits, record 
reviews, source inspections or completeness checks) and time-frame in 
conjunction with source certifications, to ensure that permitted 
sources are in compliance with the part 68 requirements. Without some 
kind of oversight, source self-certification is not a sufficient means 
of compliance assurance, given that an RMP contains information 
essential at the local level for emergency prevention, preparedness, 
and response and is not subject to routine, case-by-case review for 
quality. These oversight mechanisms do not need to be used on each 
source in order to be effective. EPA agrees that the review for quality 
or adequacy of the RMP is best accomplished by the implementing agency 
on a frequency and scope that may vary. EPA is willing to work with air 
permitting authorities on guidance, checklists or other tools to assist 
in the development of compliance mechanisms related to the RMP. In 
addition, EPA is willing to assist air permitting authorities in 
electronic checks once the electronic system for RMP submittal is 
developed. EPA emphasizes that if an RMP completeness check is used by 
the air permitting authority, it should remain independent of the 
completeness determination for the permit application. The RMP will 
most likely be submitted at a different time than a permit application, 
since almost all permit applications will have been submitted well in 
advance of the risk management program rule deadline. If the 
completeness check determines that an incomplete RMP has been 
submitted, the permitting authority can request additional information 
under Sec. 68.215(b) and should coordinate with the implementing agency 
on necessary RMP revisions. The completeness checks are facial reviews 
of RMPs to verify that there are no omissions. Such checks could be 
performed on a select basis and occasionally integrated with a multi-
purpose source inspection conducted to ensure that the air source is in 
compliance with its permit.
    8. Interaction of the implementing agency and the permitting 
authority. In the SNPRM, EPA attempted to delineate the specific 
requirements unique to the air permitting authority and the 
implementing agency. The role of the state is described in more detail 
in E.4 while the implementing agency is discussed in R. Commenters on 
the SNPRM suggested that EPA should require the implementing agency to 
certify to permitting authorities whether part 68 sources regulated 
under part 70 are in compliance with part 68 requirements. Such 
certification should be deemed sufficient to ``assure compliance'' with 
the applicable requirement under part 70. Other commenters suggested 
that the permitting authority could simply consult with the 
implementing agency when it believes there is a problem requiring 
attention or that the implementing agency should notify the permitting 
authority of any problems in part 68 compliance, so that the permitting 
authority may then expand the permit conditions accordingly.
    EPA does not believe it is necessary to define the interaction 
between the permitting authority and the implementing agency. Ideally, 
this coordination and interaction should occur at the state or local 
level. Coordination of other CAA programs (Title V, SBAP, and other 112 
programs) with the 112(r) program will ensure that the programs are 
more consistently implemented and enforced, while easing regulatory 
burden and providing the public greater access to information. However, 
when EPA is the implementing agency, it stands ready to work with air 
permitting authorities on oversight associated with permitting and 
enforcement of the part 68 requirements. Today's rule also provides the 
state the flexibility to assign some or all of its responsibilities by 
prior cooperative agreements or memoranda of understanding to the 
implementing agency or another state, local, or Federal ``designated 
agency.'' EPA recognizes that each state is structured differently and 
will have different impediments and opportunities; therefore each state 
has the flexibility to place the program in an appropriate agency or 
department, including the air permitting agency.
    9. The ``designated agency.'' In the SNPRM, EPA proposed to define 
the designated agency as the state or local agency designated by the 
air permitting authority as the agency responsible for the review of an 
RMP for completeness. This provision was designed to give the air 
permitting authority the flexibility to obtain expertise from other 
agencies to fulfill its responsibilities. Several commenters believed 
the SNPRM does not clearly allow the permitting authority to delegate 
tasks to a designated agency and the permitting authority should be 
able to delegate more than the completeness review, e.g., enforcement. 
Some commenters requested that EPA redefine the term to allow 
permitting authorities to delegate tasks to EPA or other Federal 
agencies; while one commenter argued that EPA should not allow the 
permitting authority to designate EPA as the designated agency.

[[Page 31692]]

    EPA agrees that the definition should be revised to give the air 
permitting authority more flexibility. EPA has dropped the mandatory 
completeness review, added broader implementation and enforcement 
activities, and included Federal agencies in the designated agency 
definition. Thus, a ``designated agency'' may be any state, local, or 
Federal agency designated by the state as the agency to carry out the 
provisions of Sec. 68.215, provided that such designation is in writing 
and, in the case of a Federal agency, consented to by the agency. The 
parties to any such designation should negotiate the terms and details 
of any agreements.
    10. Reopening part 70 permits to incorporate section 112(r) 
requirements. In the preamble to the SNPRM, EPA indicated that part 68 
requirements should be incorporated into part 70 or 71 permits using 
the part 70 administrative amendment process because of the timing 
difference between part 68 and air permitting. Most commenters agreed 
with this approach or indicated that permits should not be reopened at 
all; instead, sources that submitted permit applications prior to 
promulgation of the final section 112(r) regulations should not be 
subject to enforcement action under Title V until after the first 
renewal of the permit (i.e., after 5 years).
    As discussed under section E.6, if a permit without the necessary 
part 68 conditions has already been issued, then the owner or operator 
or air permitting authority shall initiate a permit revision or 
reopening according to the procedures detailed in 40 CFR 70.7 or 71.7 
to incorporate the terms and conditions under paragraph (a) of 
Sec. 68.215. Although EPA has not completed part 70 permit streamlining 
efforts, the requirements for permit revisions or reopenings should be 
complete by the time sources will be required to be in compliance with 
the part 68 requirements. Under the most recent part 70 proposal, the 
part 68 requirements would be classified as ``less environmentally 
significant'' and the associated procedures would be followed. Sources 
with such permits shall be subject to enforcement under authorities 
other than Title V.
    11. Use of Title V funds. In the SNPRM, EPA indicated that 
activities conducted by air permitting authorities should be covered by 
fees collected under part 70 since part 68 is an ``applicable 
requirement.'' EPA also acknowledged that air permitting authorities 
may not have planned for section 112(r) activities and requested input 
on alternative funding mechanisms or whether resources would need to be 
reduced in other programs to allow completion of part 68 
responsibilities.
    Several commenters raised concerns about the impact of the section 
112(r) requirements on state and local air permitting authorities 
because funding will be needed and it may not be possible in the 
current political climate for the permitting authorities to raise the 
necessary fees through Title V. Some commenters argued that funding 
decisions should be left up to the air permitting authorities.
    EPA agrees that funding decisions regarding the part 68 program 
should be made at the discretion of the state and local agencies. 
However, air permitting authorities need to be aware that the CAA 
requires states to impose permit fees that are sufficient to cover the 
direct and indirect costs of implementing the permit program, including 
part 68 activities and activities conducted by state designated 
agencies. EPA believes the straight-forward and flexible requirements 
established in today's rule impose minimal additional burden on air 
permitting authorities. Funding associated with section 112(r) 
implementation is addressed in section R, below.
    12. Other issues. In the SNPRM preamble, EPA stated that it worked 
closely with and directly involved several state and local air program 
officials and state emergency response and prevention representatives 
in the development of the preamble and regulatory language to prepare 
the approaches described. EPA stated that the proposed approaches 
``best reflect the concerns of the states about air permit program 
implementation and the needs for comprehensive participation in 
chemical accident prevention, preparedness, and response at the state 
and local level.'' Two commenters disagreed, arguing that in January 
1995, the National Governors Association (NGA) and ECOS (organization 
of state environmental officials) presented numerous recommendations to 
EPA Assistant Administrator Mary Nichols for changes in several clean 
air programs; regarding section 112(r), NGA/ECOS recommended that Title 
V permitting authorities be required only to certify that an RMP has 
been submitted. These commenters believe that the SNPRM fails to 
adequately address states' central concern; requiring permitting 
authorities to review RMPs will encumber an already overtaxed system.
    Although EPA disagrees that the proposal fails to adequately 
address states' concerns, EPA agreed that the air permitting authority 
requirements could be more sharply focused to minimize the burden. EPA 
believes that today's rule is the product of many hours of hard work 
with state and local air permitting authorities to recognize their 
concerns and to develop a rule that is effective, flexible and imposes 
the least economic burden possible.

F. General Definitions

    1. Significant Accidental Release. In the NPRM, EPA proposed to 
define significant accidental release as ``any release of a regulated 
substance that has caused or has the potential to cause offsite 
consequences such as death, injury, or adverse effects to human health 
or the environment or to cause the public to shelter in place or be 
evacuated to avoid such consequences.'' This definition was key to the 
applicability of a number of rule requirements, including hazard 
assessment, accident history, and accident investigation. Only four of 
more than 115 commenters supported this proposal arguing that the 
definition should be protective of the public and should consider 
inconvenience to the public and precautionary measures taken. Other 
commenters argued that Congress intended for the section 112(r) rules 
to address catastrophic releases, not those with minor impacts, and 
that this definition overly broadens the scope of the rule diverting 
resources and increasing cost for little additional benefit. Many 
commenters stated that ``injury'' and ``adverse effects'' are undefined 
and could mean any health impact from irreversible effects to minor 
irritation requiring no medical treatment. ``Potential to cause'' was 
also considered too vague. As discussed in Section III.C, many 
commenters objected to consideration of environmental impacts. 
Commenters also opposed sheltering-in-place and evacuation as criteria 
because these actions are often precautionary and, in many cases, are 
later viewed as unnecessary and may discourage owners or operators from 
making recommendations to evacuate or shelter-in-place. Several 
commenters submitted alternative definitions where injuries were 
limited to those that require hospitalization, adverse effects were 
limited to serious effects, and environmental effects were limited to 
those that generate human deaths or hospitalizations. Some suggested 
that all environmental effects be dropped.
    EPA agrees that the definition as proposed was too vague and 
subject to a wide variety of interpretations. In addition, EPA decided 
that a single definition does not adequately address

[[Page 31693]]

the criteria needed for all affected sections of the rule. For example, 
the five-year accident history requirement depends on the offsite 
impacts generated by the accident while endpoint criteria are used for 
the worst-case and alternate scenario offsite consequence assessments. 
Consequently, EPA has decided to drop the definition and instead 
identify the criteria for the types of releases or impacts that should 
be addressed by the appropriate requirement. EPA has considered the 
suggestions offered by commenters and added definitions of the terms 
``environmental receptor,'' ``injury,'' ``medical treatment,'' and 
``public receptor'' and adopted (with modifications as described above) 
the OSHA definition of catastrophic release. EPA notes that sources 
should be aware that within the definition of Injury, direct 
consequences include effects caused by shrapnel and debris set in 
motion by a vapor cloud explosion. EPA adopted its Medical Treatment 
definition from one OSHA uses for logging occupational injuries and 
illness. Finally, under the environmental and public receptor 
definitions, sources should note that certain parks and recreational 
areas may be both if the public could be exposed as a result of an 
accidental release.
    2. Stationary Source. Commenters requested that EPA state whether 
the term stationary source covers the entire ``facility'' or simply a 
single process and provide guidance on which requirements apply source-
wide and which are process-specific. EPA also received comments 
regarding the relationship or overlap between the stationary source 
definition and DOT regulations. These are discussed in section III.P.2 
below.
    In the List and Thresholds rule, EPA defined stationary source to 
include an entire ``facility.'' Sources will be required to submit one 
RMP and one registration as part of that RMP for all processes at the 
source with more than a threshold quantity of a regulated substance. 
Although the management system applies to all Program 2 and 3 
processes, the prevention program elements are process-specific. The 
hazard assessment requirements apply to the regulated substances, but 
only in covered processes. As a practical matter, the emergency 
response program will probably apply to the entire source although 
technically it applies only to covered processes.
    3. Process. Several commenters argued that the definition of 
process was susceptible to overly expansive interpretations and asked 
that certain activities such as storage at sources or distribution 
terminals be excluded. Many commenters sought clarification of ``close 
proximity'' and ``interconnected vessel.'' Commenters also wanted the 
definition to be consistent with OSHA.
    EPA adopted OSHA's definition of process in the original proposal 
and for the final rule. This definition specifically covers storage (as 
well as handling and processing) of regulated substances. EPA disagrees 
that storage-only sources are adequately covered by SPCC regulations 
since the regulations under SPCC and OPA-90 cover oil terminals and 
releases to water. This rule is directed at accidental releases of 
regulated substances (not including oil) to the ambient air. Generally, 
OSHA PSM also covers these chemical terminals; consequently, the only 
additional steps these sources will need to take will be to conduct the 
hazard assessment and submit the RMP, as existing emergency response 
plans may meet the emergency response program requirements.
    Since EPA's definition is identical to OSHA's, EPA will coordinate 
interpretations of the definition of process with OSHA to ensure that 
the rule is applied consistently. OSHA has stated that processes are in 
``close proximity'' if a release from one could lead to a release from 
the other. Owners or operators must be able to demonstrate that an 
``effective barrier'' exists to prevent a release from one process from 
affecting another. OSHA has interpreted ``interconnected vessel'' to 
mean vessels connected by any means, such as piping, valves or hoses, 
even if these are occasionally disconnected. EPA will also adhere to 
these interpretations.
    4. Offsite. One commenter stated that EPA's proposed definition of 
offsite should be expanded to include the air above and below the point 
of release to cover exposure to the upper atmosphere and groundwater. 
Another asked EPA to limit the definition to areas frequented by the 
public. Two commenters opposed including areas on site where the public 
has access because OSHA already covers these areas.
    In the final rule, EPA has retained a definition of offsite as 
``areas beyond the property boundary of the stationary source or areas 
within the property boundary to which the public has routine and 
unrestricted access during or outside business hours.'' OSHA's 
jurisdiction includes visitors that may be on the property of a 
facility who are conducting business as employees of other companies 
but does not necessarily extend to casual visitors or to areas within a 
facility boundary to which the public has routine and unrestricted 
access at any time.
    5. Other Definitions. Commenters raised questions about several 
other definitions. Three commenters suggested changes or clarifications 
to the definition of accidental release. EPA's definition is the 
statutory definition. Commenters also proposed modifications to the 
definition of ``analysis of offsite consequence.'' As noted above, EPA 
has determined that this definition is not needed and has deleted it 
from the final rule.
    Commenters sought clarification of the definition of mitigation 
systems and whether personnel should be considered an active mitigation 
system. Others asked for a list of passive mitigation systems and 
provided proposals. These commenters also objected to limiting passive 
systems to those that capture or control released substances; they 
suggested that systems that are designed to prevent releases or control 
the volume or rate of a release, such as vent/catch tanks, quench 
tanks, blowdown tanks, elevated stacks and high velocity stacks, 
adsorbents including carbon beds, neutralization tanks, double-walled 
vessels or pipelines, chemical sewers, closed drain header systems for 
flammables, vapor-liquid separators, fire barriers, explosion-resistant 
walls, isolation distances, barriers to prevent free access of air flow 
after a release, containment buildings, pre-charged water spray 
systems, closed vent systems, and filters should also be considered 
passive mitigation. One commenter suggested that active mitigation 
systems should be defined as those that require manual activation or an 
energy source (other than gravitational attraction) to perform their 
intended function.
    For the final rule, EPA has decided to define passive mitigation 
systems as those systems that operate without human, mechanical, or 
other energy input and would include building enclosures, dikes, and 
containment walls but excludes active mitigation systems such as excess 
flow valves, fail-safe systems, scrubbers, flares, deluge systems, and 
water curtains. In addition to the requirements outlined in Secs. 68.25 
and 68.28, EPA provides further guidance on the consideration of the 
effect of passive mitigation in its RMP Offsite Consequence Analysis 
Guidance. EPA does not believe that all systems designed to prevent 
releases or control the volume or rate of a release should be 
considered passive mitigation, consistent with its intent to reflect 
the potential for failure of any system that requires human, 
mechanical, or other energy inputs.

[[Page 31694]]

G. Risk Management Plan (RMP)

    In the NPRM, EPA proposed that owners or operators of stationary 
sources covered by the requirements submit an RMP summarizing the key 
elements of its risk management program. In the NPRM preamble, EPA 
indicated that summaries of the information requested (e.g., hazard 
assessment and emergency response program) would provide the most 
useful information to the public and local agencies without 
overburdening them with unneeded detailed information. EPA further 
stated that the RMP should serve to provide local and state agencies 
and the public with sufficient information to determine if additional 
details are needed. These details would be available, if needed, to 
implementing agency officials conducting audits or compliance 
inspections.
    1. Level of Detail. Most commenters agreed with EPA's proposal 
noting that the public should be able to identify key hazard and risk 
management information from the RMP without being overwhelmed by 
extraneous documentation that is more appropriately maintained on site. 
A detailed submission would not be cost-effective and could threaten 
plant security; these commenters expressed fears of terrorism, thieves, 
and saboteurs.
    Other commenters disagreed and argued that summaries would not 
provide enough information while ``full disclosure'' would support an 
informed public. Some commenters argued that the public could be misled 
by a summary derived from a ``full'' RMP withheld from the public by 
the source. Further, several commenters made the general argument that 
right-to-know provisions should be strengthened and that the public 
should be given full access to all risk management program information 
including PHAs and actual operating procedures. Individual commenters 
also requested public access to specific information regarding such 
details as worst-case scenarios and descriptions of chemical accidents. 
Some commenters argued that an informed public and public scrutiny, in 
general, can act as a powerful force in reducing risk and preventing 
accidents at stationary sources.
    EPA agrees that an informed public is a key element of sound 
chemical emergency prevention, preparedness, and response. However, EPA 
also believes that it is essential for the public to focus on the 
information essential at the local level for prevention, preparedness, 
and response and has decided to maintain its proposed requirement that 
the RMP provide certain information about the risk management programs 
at a source. EPA notes that its previous use of the word summary was 
not intended to imply that the source prepares a ``full'' RMP document 
from which a source extracts summary information that is shared with 
the public. Rather, the source is obligated to develop certain 
information about the hazards, prevention, and emergency response 
programs from the array of documentation at the source to prepare an 
RMP. EPA believes it would be impractical to require sources to share 
all documentation used for the safe operation of the processes at a 
source. Not only is much of this information likely to be confidential, 
but significant technical expertise and time are necessary to extract, 
understand, and to make meaningful judgments about the adequacy of the 
information. The RMP will consist of an executive summary and required 
data elements addressing all elements of the risk management program as 
described below. Detailed supporting documentation will be maintained 
on site available to the implementing agency for review.
    2. RMP Contents. Most commenters requested that EPA generally limit 
the level of detail required, the number of scenarios, or the number of 
pages in the RMP. Other commenters recommended EPA require submission 
of only information specified in the CAA and incorporate other detailed 
information by reference. Commenters also noted that documenting each 
action taken to address a hazard, the date on which the action started 
(or is scheduled to start), and the actual or scheduled completion date 
would prove impractical. EPA received many comments stating that the 
requirement that exact dates on which training, emergency exercises, or 
rescue drills, are conducted would be impractical and unnecessary.
    Commenters seeking more comprehensive RMPs argued in favor of 
requiring an index or bibliography of detailed information or a catalog 
of all available documents, an investigation and analysis of all other 
credible release scenarios, and submission of assumptions, methodology, 
and modeling methods used to determine worst-case accidents.
    As described above, EPA is considering development of a reporting 
mechanism and form to collect key data elements. As discussed below, 
this approach will foster electronic submission and immediate 
availability to Federal, state and local entities, and the public. To 
make such submission possible, EPA wants to collect data that generally 
can be reported by numerical information, yes/no answers, and check 
boxes. For the offsite consequence analyses, owners or operators will 
be asked to provide distance to the endpoint, populations and 
environments affected, and enough of the data used to determine these 
distances so that local entities and the public can check the distance 
against the distance derived from EPA's reference tables or a model 
identified in the RMP. If EPA's guidance was not used, sources will 
need to indicate which models were used. Many of the parameters for 
modeling are set in the rule and do not need to be respecified in the 
RMP. The rule requires only one alternative release scenario per toxic 
substance and one for all flammables; owners or operators may submit 
additional scenarios.
    For prevention programs, owners or operators must provide 
information (primarily dates) that will allow the implementing agency 
to assess whether the source is in compliance with the rule elements. 
For the PHA, owners or operators must state which technique was used 
for each covered process, the general hazards associated with the 
chemicals and process, the process controls in use, mitigation and 
monitoring or detection systems in use, and changes instituted since 
the last PHA (Program 3) or hazard review (Program 2) update. Through 
lists and checkoff boxes, EPA can collect a significant amount of 
information on current safety practices without requiring sources to 
develop lengthy documentation that would have proved a burden to both 
the source and any government or public data user and reduced the 
potential for electronic submission. EPA believes this approach 
provides the Agency and others with a mechanism for identifying 
industry practices and controls from almost 70,000 sources that would 
not be feasible otherwise. EPA notes that some of the largest chemical 
sources and refineries may be providing data on 30 or more processes. 
In the format proposed in the NPRM, these sources might have submitted 
several thousand pages each; analyzing such submissions would have been 
a daunting task for the implementing agencies and probably would have 
made it impossible for public interest groups to review an industry as 
a whole. With electronic submission, such reviews will be easier. The 
implementing agency or EPA can seek additional details from individual 
sources, as needed. EPA has eliminated the requirement to provide dates 
of training and emergency exercises or

[[Page 31695]]

drills because the Agency agrees that this amount of detail is 
unnecessary and impractical.
    3. Submission. In the NPRM preamble, EPA proposed that computer 
software be developed that would provide sources with a standard format 
for completing the information required in the RMP; that local 
authorities be allowed to designate the state as the receiving entity; 
or that RMPs be submitted only on request from the state, or local 
entity.
    Many commenters, particularly those in the potentially regulated 
community, supported submission of the RMP upon request or mandatory 
submission to the implementing agency with submission by request to 
other organizations. Others recommended submission to the LEPC and 
public with submission by request to the implementing agency, and SERC. 
Most commenters favored reducing the paperwork burden and electronic 
submission because it would reduce time and errors, provide more 
consistency, and make information more useful for the LEPC and 
regulatory agencies. Only two commenters opposed electronic filing 
because all sources may not have the computer capability.
    Commenters also supported the development of a standard RMP format 
regardless of whether the RMP is submitted electronically because 
standardization would ensure submissions were manageable and useful and 
would ease burdens on both regulated and reviewing entities.
    EPA has decided to work toward electronic submission of RMPs. The 
Agency believes this will meet numerous objectives of the program and 
will address several issues. First, electronic submission would reduce 
the burden on regulated and receiving entities. The Agency has noted 
that information management of regulatory documents is not a cost-free 
requirement, and that duplication of effort, including system 
development, personnel resources, and storage and maintenance efforts 
could be significant. Electronic submissions would reduce the paperwork 
burden on sources and state and local governments and would further 
serve to comply with the Paperwork Reduction Act of 1995, which 
supports the maximum feasible use of electronic submission. Second, EPA 
wishes to limit the information management burden on local entities so 
they can focus on the chemical safety issues raised by this rule.
    Third, electronic submissions would benefit affected communities 
and the general public. Besides having the RMP provide the statutorily 
required information on compliance with the regulations to the 
implementing agency, EPA believes the specific value of RMP information 
is for the local community to understand its community's risk from 
chemical accidents and to help them work with sources using these 
chemicals to reduce such risks. The Agency believes this objective 
would not be served well with a centralized paper information source 
and that using an electronic medium would support better access to 
information. With electronic submission of RMPs to a central point, 
states, local entities, and the public will have access to all RMPs 
electronically. RMP information may also be made available on-line via 
libraries and other institutions. Electronic submissions further 
address the issue of standardized RMPs. The RMP data elements included 
in the submission will be checkoff boxes, yes/no answers, or numerical 
entries to ease the burden of submission and reception and will promote 
consistency and uniformity. The Agency intends to develop technical 
guidance for the submission of the RMPs, which will provide for 
submission and receipt of an electronic formatted document containing 
the data elements outlined in Secs. 68.160 through 68.180.
    4. Other Issues. In the NPRM, EPA proposed that RMPs be resubmitted 
within six months of an information change. Several commenters argued 
it would generate a continual flow of paperwork and recommended an 
update frequency requirement of once a year.
    EPA has retained the requirement that the RMP be resubmitted within 
six months of the elimination of a substance in a process or at the 
source, a change in Program status for a process, or if a process 
change at the source requires a revised hazard assessment or hazard 
review/PHA. To be consistent with the statutory requirements for 
compliance, the RMP would also have to be updated on the date an 
already regulated substance becomes present in a process above the 
threshold or within three years of the date when EPA lists a new 
substance. EPA believes that with a standardized format and electronic 
filing, updates can be rapidly and easily made, and this information 
should be promptly shared. EPA changed the update schedule for hazard 
assessments to make them consistent with the RMP update. EPA also 
specified when offsite consequence analyses require update; the rule 
states that these analyses need to be reviewed and changed if on-site 
changes may be reasonably expected to change the distance to an 
endpoint by a factor of two or more. EPA notes that this change is 
likely to reduce the number of updates required. For PHAs, only major 
changes to a process or installation of new processes is likely to 
trigger a revised PHA. EPA expects that relatively few sources will 
need to update either their offsite consequence analyses or PHAs/hazard 
reviews more frequently than once every five years because the majority 
of sources have simple processes that do not change frequently. 
Chemical industry sources may need to submit more updates if processes 
are changing significantly. The RMP should reflect such significant 
changes.
    EPA proposed that RMPs be submitted to implementing agencies, 
SERCs, and LEPCs, and be made available to the public. Several 
commenters recommended that additional parties, local fire officials in 
particular, also receive RMPs. One commenter stated that EPCRA requires 
various reports go to local fire departments, and another commenter 
noted that RMP information may be better used by emergency management 
agencies, fire departments, and hazardous materials teams. Because EPA 
plans to have RMPs submitted to and available from a central point in 
electronic format, any agency that wants the information will be able 
to access it directly on-line. The RMP will be immediately available to 
local responders and the state. Thus, this manner of submission 
fulfills the requirements of CAA section 112(r)(7)(B)(iii). Additional 
submission requirements are, therefore, unnecessary.
    The Department of Defense (DOD) commented concerning the lack of a 
rule provision explicitly declaring that information that is classified 
under applicable laws and Executive Orders (E.O.s) is not to be 
included in the RMP. EPA is clarifying that such classified information 
is protected from disclosure by including a specific regulatory 
exemption for such information. Furthermore, EPA is clarifying that no 
provision of part 68 requires the disclosure of classified information 
in violation of Federal law, regulations, or E.O.s. Finally, EPA is 
also promulgating a definition of ``classified information'' that 
adopts the definition under the Classified Information Procedures Act.
    EPA has found no relevant statutory language superseding or 
impliedly repealing the Classified Information Procedures Act or 
applicable E.O.s regarding disclosure of classified information, nor 
has EPA found any legislative history indicating that Congress intended 
to supersede or repeal these provisions when it established the 
requirement to prepare

[[Page 31696]]

publicly-available RMPs. The provision for exemptions from standards 
and limitations established under CAA section 112 narrowly addresses 
the procedures for an exemption when ``the President determines that 
the technology to implement such standard is not available and * * * it 
is in the national security interests of the United States to do so.'' 
CAA Sec. 112(i)(4). The focus of section 112(i)(4) is on the technical 
capability to meet a limitation; for example, the provision would apply 
when an emission standard requires a control device that precludes 
national security-related equipment from functioning. Section 112(i)(4) 
does not consider or address the availability or distribution of 
classified information to the public, nor does the legislative history 
demonstrate that such disclosure was contemplated.
    The requirement of section 112(r)(7)(B)(iii) to make RMPs publicly 
available must read in congruence with the provisions prohibiting 
disclosure of classified information. ``Classified information,'' as 
defined by the Classified Information Procedures Act, 18 U.S.C. App. 3, 
section 1(a), is ``any information or material that has been determined 
by the United States Government pursuant to an Executive order, 
statute, or regulation, to require protection against unauthorized 
disclosure for reasons of national security. * * *'' ``National 
security * * * means the national defense and foreign relations of the 
United States'' 18 U.S.C. App. 3, section 1(b). Criminal penalties 
exist for unauthorized disclosure of classified information that has 
been designated by the Department of Defense or defense agencies for 
limited or restricted dissemination or distribution. 18 U.S.C. 793. It 
is not reasonable to interpret the CAA to require the disclosure of 
classified information in violation of criminal law. It has been EPA's 
long-standing policy to interpret information disclosure provisions in 
its statutes as being consistent with national security law to the 
maximum extent possible and to require such information to be 
maintained in accordance with the originating agency's requirements. 
Federal Facilities Compliance Strategy (November 1988), at page V-6. 
Therefore, EPA is promulgating language in Sec. 68.150(d) to clarify 
its intent with respect to the disclosure of classified information in 
RMPs by specifically exempting classified information from the RMP 
except by means of a classified annex submitted to appropriately 
cleared Federal or state representatives with proper security 
clearances. Furthermore, EPA is promulgating Sec. 68.210(b) to clarify 
that disclosure of classified information is controlled by the 
Classified Information Procedures Act, E.O.s 12958 and 12968, and other 
laws, regulations, and E.O.s applicable to classified information. 
Finally, in Sec. 68.3, EPA is defining classified information by 
promulgating the definition under the Classified Information Procedures 
Act.

H. Prevention Program

    In the NPRM preamble, EPA noted that the CAA requires the risk 
management program to include a prevention program that covers safety 
precautions and maintenance, monitoring, and employee training 
measures. Because OSHA PSM covers this same set of elements, EPA 
proposed a prevention program that adopted and built on OSHA PSM. The 
proposed requirements for EPA's prevention program included a 
management system requirement and sections covering nine elements: 
process hazard analysis, process safety information, operating 
procedures (SOPs), training, maintenance, pre-startup review, 
management of change, safety audits, and accident investigation.
    To assist in describing its prevention program, EPA included a 
section in its preamble comparing its prevention program to OSHA PSM 
standard. EPA noted that with the exception of the management system 
requirement, the proposed prevention program covered the same elements 
as OSHA's PSM and generally used identical language except where the 
statutory mandates of the two agencies dictated differences. EPA added 
introductory paragraphs to most sections to provide additional 
information. Further, in some of the sections, EPA proposed additional 
requirements and established different deadlines. The majority of 
comments EPA received concerned conflicts and differences between EPA's 
proposed requirements and OSHA PSM standard.
    In the final rule, the Program 3 prevention program is the OSHA PSM 
standard for parallel elements, with minor wording changes to address 
statutory differences. For elements that are in both the EPA and OSHA 
rules, EPA has used OSHA's language verbatim, changing only certain 
regulatory terms (e.g., highly hazardous chemical to regulated 
substance and employer to owner/operator) and dates. The sections of 
the OSHA PSM standard were not cross-referenced for the reasons 
discussed in section III.D of this preamble. Key issues under PSM are 
discussed below; the remainder are addressed in the Response to 
Comments Document.
    Management. In the NPRM preamble, EPA stated the purpose of its 
proposed management system is to ensure integration of all prevention 
program elements. EPA proposed that owners or operators identify a 
single person or position that has the overall responsibility for the 
development, implementation, and integration of the risk management 
program requirements. When responsibility for implementing individual 
requirements of the risk management program is assigned to persons 
other than the person designated, the names or positions of these 
people shall be documented and the lines of authority defined through 
an organization chart or similar document.
    Several commenters agreed with this approach because it serves a 
useful purpose and many PSM sources already implement management 
systems. Many commenters opposed the requirement for submission of an 
organization chart of their source because it would be of no value to 
EPA and that continual updating would waste company resources.
    EPA has decided to maintain its management system requirements in 
the final rule for sources with processes in Program 2 and 3, but has 
moved it to general requirements (Sec. 68.15) because it is the entire 
risk management program that should be managed, not just the prevention 
program. EPA has also revised the requirement to provide flexibility in 
indicating lines of authority; an organization chart is not absolutely 
required and is not included in the RMP.
    Management of Change. Some commenters objected to EPA's definition 
of replacement in kind, asking that EPA adopt the OSHA PSM definition. 
Other commenters stated that management of change procedures should 
only be implemented when the changes had the potential to increase the 
risk (e.g., an increase in inventory, an introduction of a new 
substance).
    As part of its efforts to strengthen coordination between the two 
programs, EPA will use the OSHA definition for ``replacements in 
kind'': ``a replacement which satisfies the design specification.'' 
OSHA defined this term to address a concern expressed by commenters on 
its standard that failing to define ``replacements in kind'' could 
result in misunderstandings such as employers believing that only a 
replacement with the same brand and model number could be characterized 
as a ``replacement in kind.'' OSHA promulgated a definition in 
recognition of these comments, and EPA

[[Page 31697]]

understands it to reflect a concept understood in industry.
    Further, EPA does not agree that management of change requirements 
should exclude changes that reduce the risk of an accidental release. 
The Agency does not believe that only changes to ``critical systems'' 
should be subject to management of change procedures. As EPA stated in 
the NPRM preamble, most process changes improve process safety or 
efficiency. However, even these changes may result in unintended 
effects when source owners and operators fail to evaluate the 
consequences of the change. Therefore, the Agency continues to believe 
that a change that reduces the risk of an accidental chemical release 
may, nonetheless, be an appropriate subject for a management of change 
procedure. Failure to subject such changes to a management of change 
process could inadvertently result in a change that was believed to 
lower risk when such a change, in fact, increases risk. Regarding the 
comment about critical systems, EPA notes that chemical processes are 
integrated systems, and that a change in one part of the process can 
have unintended effects in other parts of the system--irrespective of 
whether the system is ``critical.'' Consequently, EPA agrees with OSHA 
that source owners and operators must establish and implement written 
management of change procedures for any change to a regulated 
substance, process technology, or equipment and any change to a source 
that affects the covered process.
    Other Provisions. Several commenters stated that EPA should include 
in its risk management program the OSHA PSM provisions on contractors, 
employee participation, and hot work permits that EPA had not proposed 
in its prevention program. The NPRM solicited comment on whether to 
include these provisions (58 FR 54205; October 20, 1993). Commenters 
argued that contractors have been responsible for a number of accidents 
that have affected the public and the environment. Commenters presented 
the same argument to support inclusion of the hot work permit 
requirements. A substantial number of commenters also argued that 
employee participation is a key factor in successful implementation of 
PSM. A few commenters supported EPA's initial position that these 
requirements were more properly OSHA concerns.
    In response to the former commenters' arguments and to ensure 
consistency between the elements of the two rules, EPA has decided to 
add these sections to its Program 3 prevention program. EPA believes 
that each of these elements is important to the implementation of an 
effective prevention program. Worker participation in PHAs and other 
elements is critical to the success of process safety because workers 
are intimately familiar with the process and equipment operation, 
possible failure modes and consequences of deviations. It also serves 
as a mechanism for greater communication and understanding of specific 
process hazards (as opposed to the general chemical hazards) and the 
importance of developing and following proper procedures. Similarly, 
contract employees have been involved in a number of major accidents in 
recent years; for example, the explosion in Pasadena, Texas, in 1989, 
which killed 23 workers, has been attributed to improper maintenance 
practices by contractor employees. Oversight of contractors, therefore, 
can be critical for accident prevention. Finally, hot work permits 
ensure that use of flame or spark-producing equipment is carefully 
controlled. Not only are many of the listed substances highly 
flammable, but fires in the vicinity of vessels or pipes containing the 
toxic substances can lead to releases of these substances.

I. Accident History

    In the NPRM, EPA required sources to document a five-year history 
of releases that caused or had the potential to cause offsite 
consequences for each regulated substance handled at the source. EPA 
specified that the accident history should include the nature of any 
offsite consequences, such as deaths, injuries, hospitalizations, 
medical treatments, evacuations, sheltering-in-place, and major offsite 
environmental impacts such as soil, groundwater, or drinking water 
contamination, fish kills, and vegetation damage.
    A few commenters argued that releases with only the potential for 
offsite consequences should not be included, while other commenters 
were evenly divided on whether near-miss events should be included in 
the accident history. A number of commenters indicated that releases 
with on-site consequences should be added to the accident history. 
Several commenters requested that EPA clarify that the accident history 
applies only to covered processes.
    In recognition of these comments, in the final rule, only those 
accidents from covered processes that resulted in deaths, injuries, or 
significant property damage on-site, or known offsite deaths, injuries, 
evacuations, sheltering in place, property damage, or environmental 
damage need to be included in the five-year accident history. Near-miss 
accidents or accidents with only the potential for offsite consequences 
(that did not meet any of the previous criteria) would not need to be 
included. Because the accident history is, by statute, an aspect of the 
hazard assessment, and the hazard assessment provisions apply only to 
covered processes, EPA believes that requiring the accident history to 
address accidental releases from processes not covered by this rule 
would be inconsistent with the structure of part 68. EPA notes that 
such releases may be subject to reporting under other statutes; the 
Agency may investigate such releases to determine the need for a 
response action under CERCLA and to determine whether CAA section 
112(r)(1) has been violated.

J. Emergency Response Program

    In the
FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
 proposed rule, EPA required sources to develop an emergency 
response plan that defines the steps the source and each employee 
should take during an accidental release of a regulated substance. EPA 
noted that most sources are already required to have at least part of 
the emergency response plan in place as a result of other EPA (Spill 
Prevention, Control, and Countermeasures and Resource Conservation and 
Recovery Act) and OSHA (emergency action plans and HAZWOPER) 
regulations and requested comment on how the proposed requirements 
could best be integrated with these existing programs to minimize 
duplication. Many of the commenters were particularly concerned with 
the potential for increased duplication of emergency planning 
requirements at the state and Federal levels that would require 
expenditure of additional resources without improving source emergency 
response capabilities. Most of these commenters suggested that EPA 
allow compliance with other Federal regulatory programs to meet the 
mandate of the Clean Air Act for an emergency response program, while 
other commenters recommended that EPA work with other agencies to 
develop a format for a single, comprehensive response plan for the 
source. Some commenters addressed related concerns with respect to 
state program or voluntary initiatives.
    EPA has decided to adopt the emergency response requirements found 
in the statute, without additional specific planning requirements. This 
action is consistent with the Agency's effort to develop a single 
Federal approach for emergency response planning. The Review of Federal 
Authorities for Hazardous Materials Accident Safety, (required under 
section

[[Page 31698]]

112(r)(10) of the Clean Air Act) reported little harmony in the 
required formats or elements of response plans prepared to meet various 
Federal regulations. Accordingly, EPA has committed not to specify new 
plan elements or a specific plan format in today's rule. EPA believes 
that plans developed to comply with other EPA contingency planning 
requirements and the OSHA Hazardous Waste and Emergency Operations 
(HAZWOPER) rule (29 CFR 1910.120) will meet the requirements for the 
emergency response program provided that they address the elements in 
section 68.95(a). EPA believes that coordination of the emergency 
response plan with the community emergency response plan will help 
ensure that offsite response issues are addressed. In addition, EPA and 
other National Response Team agencies have prepared Integrated 
Contingency Plan Guidance (``one plan'') (NRT, May 1996). An emergency 
response plan that includes the elements specified in this guidance can 
be used to meet the requirements in today's rule. The final rule also 
provides relief for sources that are too small to respond to releases 
with their own employees; these sources will not be required to develop 
emergency response plans provided that appropriate responses to their 
hazards have been discussed in the community emergency response plan 
developed under EPCRA (42 U.S.C. 11003) for toxics or coordinated with 
the local fire department for flammables.

K. Registration

    In the NPRM, EPA proposed that sources register with the EPA 
Administrator by three years after the publication date of the final 
rule, or within three years of the date on which a source becomes 
subject to the risk management program requirements as mandated by the 
CAA. While a number of commenters agreed with this proposal, a greater 
number requested that EPA accelerate the registration to between six 
months and two years of promulgation of the rule so that implementing 
agencies could better determine resource allocation and conduct more 
extensive outreach and technical assistance to sources developing risk 
management programs and preparing RMPs.
    EPA agrees that earlier registration could aid outreach efforts and 
help implementing agencies focus resources. However, since the first 
RMP need not be submitted until June 21, 1999, an earlier, pre-
registration would impose an additional burden on sources. Some sources 
may reduce inventories, make process modifications or switch chemicals 
prior to the first RMP due date and, consequently, will not be subject 
to the rule. If EPA required a pre-registration, these sources would 
have to deregister at that time. Further, states and local agencies 
already have information gathered under EPCRA section 312 that could be 
used for early identification and outreach to sources covered by this 
rule. EPA is also working with trade associations and other 
representatives of affected industries to ensure that sources are aware 
of the rule. Instead, in today's rule, the registration is included as 
part of the RMP to limit the number of filings made by sources.
    EPA also proposed that sources submit written registration 
information. A number of commenters advocated either the modification 
of existing forms (e.g., the EPCRA Tier II form) or an electronic 
filing system for the submission of this information. Since the RMP and 
the registration are consolidated into one submission, this issue is 
addressed generally in Section III.G.
    Under the proposed rule sources would need to submit an amended 
notice to the Administrator and the implementing agency within 60 days 
if information in the registration is no longer accurate. Many 
commenters argued that six months or a year is needed to ensure 
compliance with the certification requirements. EPA agrees with 
commenters and in the final rule has lengthened the time for submission 
of an amended registration to six months which should be enough time to 
modify the information and to electronically resubmit the registration 
and RMP.

L. Model Risk Management Programs

    Commenters supported the development of model risk management 
programs and RMPs, stating that the models were needed by smaller 
businesses and public systems that lack the expertise to implement 
process safety management. Commenters specifically supported 
development of models for industries with well-understood processes and 
practices, such as chlorination systems, propane and ammonia retailers, 
and refrigeration systems. A few commenters asked that the models be 
made available for public review. Others said the models should be 
published as guidance, not regulations.
    EPA is working with industry groups to develop model programs for 
ammonia refrigeration, propane handling, and water treatment. After 
having provided the public with an opportunity to review a draft of the 
ammonia model program, EPA today is issuing a guidance on a model 
program for this industry (see Model Risk Management Program for 
Ammonia Refrigeration). EPA encourages other industry groups to work 
with the Agency to develop models for their sectors. EPA notes that the 
models are particularly relevant to sources with Program 2 processes. 
Because EPA has adopted the OSHA PSM standard, EPA has not provided an 
EPA guidance on PSM compliance. EPA will also publish general technical 
guidance to help sources understand and comply with the rule which will 
include Program 2 prevention program guidance. The RMP Offsite 
Consequence Analysis Guidance contains reference tables for the offsite 
consequence analysis, which can be used instead of site-specific 
modeling. EPA emphasizes that the models are guidance, not regulations; 
sources are not required to use them.

M. Implementing Agency Audits

    EPA originally proposed in Sec. 68.60 seven criteria an 
implementing agency could use to determine whether to audit a source's 
RMP. EPA also proposed that the implementing agency have the authority 
to determine whether an RMP should be revised and to direct the owner 
or operator to make revisions. Many commenters suggested that the 
Agency lacked statutory authority to specify measures to correct risk 
management program elements through the RMP, and that RMP changes based 
on implementing agency directives will be costly.
    EPA or other implementing agencies have general inspection and 
enforcement authority under CAA sections 112(r)(7)(E), 113, and 114 to 
compel source owners and operators to correct deficiencies in the risk 
management program. EPA intends to use the audit process as a way to 
verify the quality of the program summarized in the RMP. When it is 
reasonable, EPA will require modifications to the RMP that may lead to 
quality improvements in the underlying program.
    EPA notes that many commenters were uncertain of the distinction 
among audits conducted under Sec. 68.220, reviews by the permitting 
authority under Sec. 68.215, and inspections. CAA section 
112(r)(7)(B)(iii) requires EPA to develop, by regulation, a system for 
auditing RMPs. These audits will review the information submitted by 
sources to determine whether the source is in compliance with the rule 
elements. For example, the implementing agency will consider whether 
the dates for reviews and revisions of various elements are consistent 
with the steps sources are

[[Page 31699]]

required to take. If a source reported a major change on a date later 
than the last date on which safety information and operating procedures 
were reviewed, the implementing agency could seek further information 
about why such reviews had not been conducted and require updates if 
the agency determined that the source should have reviewed the 
documents. Audits may be detailed paper reviews or may be done at a 
source to confirm that on-site documentation is consistent with 
reported information.
    In contrast, the air permitting authority or its designated agency 
may be reviewing the RMP for completeness, rather that the quality of 
the RMP contents. Inspections are generally more extensive in scope 
than audits although they may include a review of the accuracy of the 
RMP information. Inspections will consider whether the source is in 
compliance with part 68 as a whole, not just with the RMP requirements, 
and may review both the documentation kept at the source and operating 
practices.
    Regarding comments that making changes to the RMP would be too 
costly, EPA has endeavored to ameliorate the cost burden of this rule 
by using a tiering approach to make the risk management program 
elements on which the RMP rests appropriate for sources of various 
sizes and complexity. In addition, EPA is considering development of a 
standard RMP reporting format and data elements, which should 
significantly reduce the time and effort necessary to revise the RMP. 
Any source owner or operator can further limit the costs associated 
with revising its RMP by submitting a timely, complete, and valid plan 
in the first instance.

N. Public Participation

    In the SNPRM, EPA requested comments on how public participation in 
the risk management program process might be encouraged. EPA's 
preferred approach was to encourage the public and sources to use 
existing groups, primarily the LEPC, as a conduit for communications 
between the source and the public throughout the RMP development 
process. A substantial number of commenters supported this approach, 
stating that the LEPC was well placed to interpret the RMP information 
for the public. Commenters said that LEPCs and their member 
organizations have considerable experience and have established rapport 
in dealing with the community. Others stated that this role is a 
logical extension of current LEPC responsibilities under EPCRA, 
although funding for LEPCs was a concern.
    A number of commenters opposed this approach because some LEPCs are 
not functional and that LEPCs are not a substitute for public 
participation. A few LEPCs also objected to assuming any additional 
role. Commenters suggested that EPA should require public participation 
in the development of the RMP and require all major sources to have a 
public participation strategy. Industry commenters generally opposed 
any mandated public participation requirements because direct 
involvement in risk management program development would delay the 
process and would represent an unwarranted and inappropriate 
interference in management and site control responsibilities. A few 
commenters supported the SNPRM suggestion that public participation be 
limited to sources with Program 3 processes because these sources 
represent the greatest risk. Other commenters opposed this idea, 
preferring the decision to be left to local authorities.
    EPA has not adopted any specific public participation requirements. 
EPA plans to make the RMP immediately available to any member of the 
public. LEPCs and others will be able to compare their sources with 
similar sources in other areas to determine whether quantities on 
sites, process controls, mitigation systems, and monitoring systems are 
significantly different. This information will give the public an 
opportunity to gain a better understanding of local industries and 
carry on a more informed dialogue with sources on their prevention 
practices. EPA continues to encourage sources to work with the LEPCs 
and other community groups to provide information to the public and 
ensure an on-going dialogue during and after RMP development and 
submission. The public is a valuable resource and a key stakeholder in 
chemical accident prevention, preparedness, and response at the local 
level.
    A number of commenters said that EPA should prohibit the public 
from triggering an audit through petitions because this approach would 
open the process to litigation; a petition process would be expensive, 
time-consuming, and increase the time needed to complete the RMP. Some 
commenters said it would impose an excessive burden on the implementing 
agency. Two commenters favored public petitions to trigger audits. One 
said that the audits should be conducted by qualified third parties, 
subject to community selection and supervision.
    EPA has not included public petitions as a mechanism for periodic 
audits of sources under Sec. 68.220. States, however, are able to adopt 
more stringent requirements.

O. Inherently Safer Technologies

    In response to the NPRM, a number of commenters stated that EPA 
should require sources to conduct ``technology options analyses'' to 
identify inherently safer technologies. In the SNPRM, EPA solicited 
comments on this issue, but did not propose a requirement for such 
analyses.
    A number of commenters stated that EPA should require analyses of 
inherently safer technologies, at least for sources with Program 3 
processes or new processes. Some commenters argued that inherent safety 
is primary prevention (directed at the source of the hazard), while 
EPA's proposed requirements are secondary prevention (control of the 
hazard). One commenter asked that sources be required to provide full 
economic and technical analyses of options. Commenters argued that 
without a technology options analysis requirement, industry will not 
conduct these analyses because, unlike its pollution prevention 
efforts, EPA has provided no incentive for safer plants.
    Other commenters strongly opposed any requirement for these 
analyses because PHA teams regularly suggest viable, effective (and 
inherently safer) alternatives for risk reduction, which may include 
features such as inventory reduction, material substitution, and 
process control changes. These changes are made as opportunities arise, 
without regulation or adopting of completely new and unproven process 
technologies. Commenters said that similar analyses are frequently 
conducted during the design phase of a process or source where there 
are sufficient economic incentives to design a process with as few 
costly additional safety features as possible without new EPA 
requirements. Commenters also said that a requirement would prove 
costly, without providing commensurate benefits.
    EPA has decided not to mandate inherently safer technology 
analyses. EPA does not believe that a requirement that sources conduct 
searches or analyses of alternative processing technologies for new or 
existing processes will produce additional benefits beyond those 
accruing to the rule already. As many commenters, including those that 
support such analyses, pointed out, an assessment of inherently safer 
design alternatives has the most benefit in the development of new 
processes. Industry generally

[[Page 31700]]

examines new process alternatives to avoid the addition of more costly 
administrative or engineering controls to mitigate a design that may be 
more hazardous in nature. Although some existing processes may be 
superficially judged to be inherently less safe than other processes, 
EPA believes these processes can be safely operated through management 
and control of the hazards without spending resources searching for 
unavailable or unaffordable new process technologies. Good PHA 
techniques often reveal opportunities for continuous improvement of 
existing processes and operations. EPA encourages sources to continue 
to examine and adopt viable alternative processing technologies, system 
safeguards, or process modifications to make new and existing processes 
and operations inherently safer. EPA included questions related to 
process modifications in the RMP so that sources can demonstrate, and 
users of the RMP information can observe, progress toward safer 
processes and operations.

P. Coverage by Other Regulations

    A large number of commenters expressed concerns about duplication 
between the risk management program rule and other Federal and state 
regulations. Issues related to overlap between this rule and OSHA PSM 
are discussed in Section III.D of this preamble; issues related to 
overlap between this rule and other emergency response planning 
regulations are discussed in Section III.J of this preamble.
    1. General Issues. A substantial number of commenters stated that 
EPA had failed to consider other regulations to which sources are 
subject that cover some of the same requirements as this rule. They 
noted that many sources are covered by DOT rules, other EPA rules, OSHA 
rules, and, in some cases, other agency or state rules. Some commenters 
argued that these other regulations essentially prevent accidents and, 
therefore, this rule is not needed. Commenters stated that EPA should 
define jurisdictional and enforcement boundaries so that sources 
subject to multiple regulations are not subjected to multiple 
enforcement actions for the same violation. Other commenters said that 
EPA should clearly identify which similar requirements imposed by other 
programs satisfy this rule and what additional steps are needed. Some 
commenters said that any source covered by another, similar rule should 
be excluded from this rule. Others suggested that EPA explicitly cross-
reference other applicable rules. A few commenters stated that EPCRA 
reporting requirements provide ample information to local entities and 
no further reporting is needed.
    EPA disagrees with some of these comments. Except for the OSHA PSM 
rule, no other rule cited by the commenters addresses accidental 
releases of regulated substances to the extent that today's rule does. 
Some Federal and state rules for certain industries provide design 
standards; compliance with these rules will satisfy parts of today's 
rule. For example, sources in compliance with 29 CFR 1910.111 for 
handling of anhydrous ammonia may not need to take additional steps to 
ensure the safe design of the process. These other standards generally 
do not cover training, maintenance, hazards analysis, and accident 
investigation, which are all key elements in process safety management. 
In addition, none of the Federal rules require offsite consequence 
analyses or reporting to the public on the results of these analyses 
and on prevention steps. Information submitted under EPCRA, which 
consists primarily of annual inventories, is not equivalent to the RMP 
information.
    Nevertheless, EPA agrees with commenters that duplication should be 
minimized, which is why the emergency response and Program 2 prevention 
program steps recognize that meeting other requirements will satisfy 
elements of this rule. The model risk management programs that EPA is 
developing with industry will explicitly cite other regulations, as 
well as codes and standards, that satisfy specific elements of this 
rule.
    2. DOT Transportation Regulations. Commenters concerned with 
overlap with DOT regulations focused on two issues: pipeline 
regulations, and loading/unloading and storage regulations. Commenters 
asked EPA to exclude pipelines and transportation containers connected 
for loading or unloading since these are adequately covered by DOT 
regulations. Some commenters disagreed and wanted loading and unloading 
of transportation containers to be included because many accidents 
occur during these procedures.
    In the final List Rule, EPA defined stationary source to include 
``transportation containers that are no longer under active shipping 
orders and transportation containers that are connected to equipment at 
the stationary source for the purposes of temporary storage, loading, 
or unloading.'' One commenter stated that the 1993 oleum release in 
Richmond, California, demonstrated that DOT regulations do not 
adequately address risk management of loading and unloading. The other 
commenters, however, said that loading and unloading were covered by 
DOT regulations and should not be subject to this rule. They noted that 
DOT has adopted regulations requiring training for anyone who loads or 
unloads hazardous materials. They further said that at distribution 
centers, regulated substances are not used or processed, and, if in 
packages, the containers are not opened.
    Several commenters were concerned that EPA regulation in this area 
could create problems with DOT's preemption of state rules. Under U.S. 
law, states may not adopt regulations in certain specified areas that 
are not substantively the same as DOT rules or in other areas that pose 
an obstacle to DOT goals under Federal Hazardous Materials 
Transportation Law. If state laws are authorized by Federal law, 
however, states could develop different requirements than DOT imposes. 
In this case, the commenter said, if EPA were to regulate loading and 
unloading under the CAA, the states would have the authority under the 
CAA to impose more stringent requirements on this activity.
    EPA disagrees with the commenters concerning the scope of the 
Hazardous Materials Transportation Act preemption authority in this 
area. EPA's definition of stationary source clearly covers 
transportation containers only when they are no longer in 
transportation in commerce and was addressed in the List Rule. EPA 
believes commenters have overstated the extent of any preemption 
problem. EPA's interpretation today is consistent with DOT's, as 
explained in ``California and Los Angeles County Requirements 
Applicable to the On-Site Handling and Transportation of Hazardous 
Materials--Preemption Determination'' (60 FR 8774, 8776-78, February 
15, 1995). EPA notes that in many cases warehouses and wholesalers take 
delivery of materials and resell them; EPA considers this storage to be 
covered by today's rule. EPA believes that DOT standards for container 
integrity satisfy process safety information requirements. The same 
applies to DOT standards for training requirements for loading and 
unloading; that training satisfies the training requirements of this 
rule for loading and unloading. Requirements for the PHA only apply to 
connections to transportation containers and for storage of containers.
    3. Other EPA Regulations. Many commenters stated that other EPA 
regulations cover the same activities and

[[Page 31701]]

should be deferred to or referenced to prevent duplicative requirements 
and enforcement. A number of commenters said that regulations under the 
Clean Water Act, specifically the Spill Prevention, Control, and 
Countermeasure (SPCC) and Oil Pollution Act of 1990 (OPA-90) rules, 
duplicate many of the provisions of this rule. Other commenters argued 
the Underground Storage Tank (UST) rules require sources to comply with 
requirements equivalent to many of the notification, prevention, and 
emergency response provisions. A few commenters stated that EPCRA 
already covers the right-to-know provisions; others stated that the 
risk management program regulations should support existing EPCRA 
rules. Three commenters said that EPA should exempt any source covered 
by the Resource Conservation and Recovery Act (RCRA) because the rules 
under that act already impose comprehensive risk management 
requirements.
    As discussed in Section III.J, emergency response plans developed 
under SPCC, OPA-90, or RCRA can be used to meet the emergency response 
requirements of this rule. EPA notes, however, that SPCC, OPA-90, and 
UST rules do not address storage, handling, and release prevention for 
regulated substances. SPCC and OPA-90 rules apply to oil; UST rules 
apply to oil and gasoline. The processes addressed by these rules, 
therefore, do not overlap with the processes covered by today's rule.
    RCRA requirements apply only to certain activities undertaken at 
sources that may be subject to the requirements of today's final rule. 
As noted above, EPA anticipates that emergency response plans developed 
under RCRA can be used to meet the emergency response requirements of 
this rule. In addition, certain training and other release prevention 
activities required under RCRA may satisfy certain of the prevention 
program requirements for Program 2 processes.
    4. Other Federal Regulations. A number of commenters stated that 
EPA should not cover outer continental shelf (OCS) sources because they 
are adequately regulated under the Marine Mineral Service, Pipeline 
Safety Act, and OPA-90. The mining industry said that they should not 
be covered because their handling of explosives is regulated in great 
detail by the Mine Safety and Health Administration and the Bureau of 
Alcohol, Tobacco, and Firearms. In its proposed rule (61 FR 16598, 
April 15, 1996), EPA has proposed to delist explosives and proposed a 
stay of the affected list provisions; elsewhere in today's Federal 
Register, EPA has stayed implementation of the affected provisions 
until these changes are finalized. OCS sources are not subject to part 
68 because the connection between this part and protection of ambient 
air quality is too remote; therefore, CAA section 328 proscribes EPA's 
jurisdiction.
    5. State and Local Regulations. Commenters sought clarification of 
how risk management programs implemented under state laws in Delaware, 
New Jersey, California, and Nevada would be treated. Some commenters 
said sources complying with these state rules should be grandfathered 
into EPA's rule for at least five years. California commenters asked 
that risk management prevention programs (RMPPs) developed and 
submitted under California's rule be considered in lieu of the required 
RMP. Some commenters asked that documentation created to meet the state 
requirements be considered adequate to meet EPA's program so that 
additional documentation need not be created just to meet slightly 
different rules. A few commenters suggested that EPA should explicitly 
preempt any state risk management program regulations that are not 
submitted to and approved by EPA. Other states said that EPA should 
defer to state rules on hydrogen sulfide and propane.
    None of the four state risk management program rules is identical 
to EPA's or each other. The Delaware, New Jersey, and Nevada programs 
closely parallel the OSHA PSM rule; the California program is less 
specific. EPA expects that sources in compliance with these state 
programs will have completed most of the steps required under EPA's 
rule. EPA notes that these sources are generally also covered by OSHA 
PSM and, therefore, should be in compliance with a significant portion 
of EPA's rule.
    In relation to the request for grandfathering, EPA does not have 
the authority to grandfather compliance with programs that the Agency 
has not reviewed and approved. EPA expects that these four states will 
seek delegation of the 112(r) program under CAA section 112(l). At that 
time, EPA will review the state programs and approve them if they are 
as stringent as EPA's rule and meet other section 112(l) requirements. 
If states are granted delegation, they will have the authority to 
grandfather previous compliance. Because the CAA specifically grants 
states the right to impose more stringent regulations, EPA cannot 
preempt state programs as one commenter requested.
    EPA believes that substitution of the RMPP for the RMP for 
California sources is not feasible. The California RMPPs are voluminous 
documents, submitted per process, not per source. These documents could 
not be submitted electronically. Because EPA is concentrating on 
submission of data elements, EPA believes that its RMP requirements can 
be met quickly by any source that has completed an RMPP. Completion of 
the RMP will not impose a large burden on sources. If the RMPP has 
summary sections, these may be directly transferable for use as the 
executive summary.
    In regard to other state laws, states may include them as part of 
their CAA section 112(l) submission for EPA's review and approval. 
These laws, however, must be as stringent as EPA's; that is, they must 
cover all elements of the rule with requirements that at least match 
EPA's. EPA notes that state propane laws are generally based on NFPA-
58, which EPA is using to help develop its model risk management 
program for propane distributors and users. Therefore, sources in 
compliance with NFPA-58 requirements may meet many of the requirements 
of Program 2, as defined in the model.

Q. Industry-Specific Issues

    A number of industries submitted comments on issues that were 
particular to them, in many cases seeking exemption from the rule.
    1. Oil and Gas Facilities. Industry commenters argued that 
components of the oil and gas industries should be excluded from EPA's 
risk management program; in particular, that EPA should exempt the 
following operations and facilities from RMP requirements:
     Atmospheric storage and transfer of flammable liquids;
     Retail facilities;
     Marketing terminals and bulk plants;
     Remote, low-risk petroleum operations;
     Oil and gas exploration, production and processing 
facilities;
     Crude oil separation, handling, and storage operations;
     Subsurface hydrocarbon reservoirs;
     All transportation and facilities incident to 
transportation; and
     Outer continental shelf facilities.

Commenters noted that these industries and facilities pose a low risk 
to the public for a number of reasons. Significant accidental releases 
are highly unlikely because these facilities handle materials which, 
given site conditions, have limited potential for release to the air or 
offsite impacts. Existing regulations reduce the potential

[[Page 31702]]

for significant accidental releases. Additionally, commenters argued 
that the RMP provisions extend beyond EPA's statutory authority and run 
counter to the Domestic Natural Gas and Oil Initiative established by 
President Clinton.
    Commenters stated that most of the exploration and production 
facilities are remotely located and argued that even the tiering 
approach that EPA proposed in the SNPRM did not provide adequate relief 
for these sources, which pose minimal risks. They noted that OSHA 
specifically excludes remotely located sources, retail facilities, DOT-
regulated sources, and atmospheric storage tanks. A number of 
commenters said that EPA had never included most of these sources in 
its economic analysis, implying that EPA did not intend to cover them 
in these regulations; they requested an explicit statement to that 
effect. One commenter opposed an exemption for oil and gas sources and 
pipeline and other transportation companies, arguing that these sources 
have some of the most common or worst accidents.
    EPA does not agree that marketing terminals or bulk plants should 
be excluded if there are regulated substances present above their 
threshold quantities. Although EPA did not specifically exempt gasoline 
and naturally occurring hydrocarbons (e.g., crude oil), it did not 
intend to cover regulated flammables in these mixtures. In its proposed 
rule (61 FR 16598, April 15, 1996), EPA has proposed to revise the 
criteria for flammable mixtures and to exclude naturally occurring 
hydrocarbons prior to processing at a gas processing plant or refinery. 
Flammable mixtures would be covered only if they met all of the NFPA-4 
criteria. Gasoline and crude oil are listed with NFPA 3 flammability 
ratings in NFPA 325 M, Fire Hazard Properties of Flammable Liquids, 
Gases, and Volatile Solids, 1991. Elsewhere in today's Federal 
Register, EPA has stayed implementation of the risk management program 
rule for substances and processes that would be affected by the 
proposed changes. As EPA explained in the preamble to the final list 
rule, the Agency has not adopted OSHA's exemption for atmospheric 
storage of flammables because, unlike OSHA, EPA has listed only 
flammable gases and highly volatile flammable liquids. EPA considers 
these substances to be intrinsically hazardous, regardless of storage 
conditions and, therefore, does not believe it is appropriate to 
provide an exemption for such tanks.
    2. Retail Facilities. The rule is expected to cover a substantial 
number of retail facilities, specifically those handling propane and 
ammonia as a fertilizer. Approximately 100 commenters requested that 
EPA exempt propane retailers from coverage under the risk management 
program, primarily due to the effectiveness of the existing regulatory 
structure for the industry (in particular, NFPA Standard 58). At the 
same time, more than 50 commenters requested that EPA exempt 
agricultural chemical retailers (with inventories of ammonia 
fertilizer) from coverage under the risk management program because of 
the existing state and Federal regulation of these operations.
    a. Propane Retailers. Commenters argued that the primary thrust of 
the proposed regulations is to preclude unwarranted risk to the 
surrounding community from an accidental failure of a storage tank. 
They stated that the basic purpose of NFPA 58, the Storage and Handling 
of Liquefied Petroleum Gases, is to prevent such releases through 
design and engineering. This standard requires fire safety analyses, 
distance separation between the storage tank and surrounding exposures, 
and approval of plans for new or existing facilities by local 
authorities. They noted that NFPA 58 has been adopted as state law in 
48 of the 50 states and that the two remaining states (California and 
Texas) have similar rules. They said that propane storage containers 
are manufactured strictly to the specifications of the American Society 
of Mechanical Engineers. According to commenters, emergency response 
planning is already covered by NFPA-58, OSHA, and DOT. Because of 
compliance with this standard and state law, commenters argued that the 
rule would not provide any improvement in safety. A number of 
commenters argued that propane was a heating fuel, not a chemical, and 
did not pose the same level of risk as larger quantities of propane 
held and used as a chemical feedstock. One commenter noted that OSHA 
had exempted retailers and propane when used as a fuel.
    In contrast, one state, which also regulates propane under its 
state risk management program law, argued that propane is not 
sufficiently regulated. It stated:
    Fire authorities inspect each new facility before propane is 
introduced. They concentrate on adequate fire water supply, electrical 
code compliance, and distance separation requirements. Some fire 
authorities are not technically capable of determining if the facility 
piping system complies with NFPA 58. There are no follow-up inspections 
to assure continuing compliance and no requirements under NFPA 58 for 
training distribution plant operators or mechanics, written maintenance 
programs, or procedures to control change. During our inspections, we 
have identified some facilities that were not in conformance with NFPA 
58.
    EPA does not agree with commenters who are seeking exemption of 
propane retailers and users. In a supplemental notice, EPA sought 
comment on whether flammable substances, when used as a fuel, posed a 
lesser intrinsic hazard than the same substances handled otherwise; no 
data were submitted to EPA to justify this position. Further, EPA has 
considerable accident data for propane that illustrates its potential 
to affect the public located nearby. As a result, EPA continues to 
believe that the hazard posed by propane is inherent and does not vary 
with its use. Because of a lack of data justifying a different level of 
hazard for flammables used as fuel, the Agency will not adopt a fuel 
use exemption similar to that provided by OSHA.
    Furthermore, EPA notes that many propane retailers are relatively 
close to other commercial buildings and the community. Should a fire or 
explosion occur, the community could be substantially impacted. EPA 
believes the community and sources need to be aware of the potential 
risk and understand the steps the source is taking to limit the 
potential for a release. Because EPA recognizes that the full PSM 
standard is not appropriate for propane retailers, EPA has assigned 
propane retailers and users to Program 2. Compliance with most aspects 
of Program 2 should be simple. For example, use of tanks that meet 
relevant ASME standards and retention of the material safety data 
sheets required by OSHA will satisfy the safety information 
requirements of Sec. 68.48. Furthermore, EPA is developing a model risk 
management program to help sources comply. This model is being based on 
NFPA-58 standards, where they apply, so that sources already in 
compliance with NFPA-58 will be in substantial compliance with Program 
2. The model will help sources comply with other elements in a cost-
effective manner.
    b. Ammonia Retailers. Ammonia is sold as a fertilizer from 
agricultural retailers, primarily in the Middle West, Great Plains, and 
West. Commenters stated that the retail fertilizer industry is already 
governed by OSHA's Health and Safety Standards, which are specifically 
applicable to the storage and handling of anhydrous ammonia. They noted 
that this standard (29 CFR 1910.111) is based on ANSI K61.1 and sets 
forth extensive

[[Page 31703]]

requirements applicable to the design, construction, location, 
installation, and operation of anhydrous ammonia facilities. Measures 
designed to adequately provide for the prevention of and response to 
accidental releases are an integral part of this standard. Some 
commenters said that if EPA did not exempt retail sources, ammonia 
retailers should be deemed to be in compliance with the prevention 
program. In addition, commenters said they are regulated under state 
laws and are subject to EPCRA reporting requirements. Many commenters 
argued that retail fertilizer sources have an excellent safety record. 
They stated that retail fertilizer facilities are limited in size, do 
not involve complex processing and manufacturing operations, and are 
located in rural areas; consequently, they present a low risk to the 
surrounding communities. Commenters objected to the regulations because 
they would impose a substantial burden on what are small operations. 
Some commenters argued that, because Congress had granted EPA the 
authority to exempt ammonia when held by a farmer for use as a 
fertilizer, EPA could grant retail ammonia sources the same exemption.
    Although EPA recognizes that other regulatory programs address 
safety for agricultural retailers and that such operations do not 
involve complex processing or manufacturing, EPA disagrees with the 
conclusions of these commenters. According to the industry, the typical 
ammonia retailer has 200 tons of ammonia on site at times. Even in 
rural areas, release of even a fraction of this quantity could affect 
the community. Sources constructed and operated consistent with the 
relevant ANSI standard will meet the EPA rule for subjects addressed by 
both. EPA recognizes the OSHA standard for anhydrous ammonia handling 
and hopes to work with the ammonia industry to develop a model risk 
management program for ammonia retailers. This model would be based on 
the OSHA standard, where applicable. The standard, however, does not 
include some elements mandated by the CAA as part of the prevention 
program, specifically training and maintenance programs. In addition, 
EPA believes that there is a further need to convey information on 
hazards and risk management practices of these operations to the public 
and local entities. The model will provide guidance to help sources 
comply with these elements in a cost-effective manner. Finally, EPA 
does not agree that the Congressionally allowed exemption of farmers 
can be extended to non-farmers. See 136 Cong. Rec. S2284 (March 7, 
1990) (colloquy between Sens. Kerrey and Chafee).
    3. Refrigeration Systems. A number of commenters stated that 
ammonia used in a refrigeration system should be exempted from this 
rule because these systems pose little risk to the public. One 
commenter said that EPA should exempt roof-mounted air handlers, pipes, 
and components. Some commenters said that the industry was already 
overregulated and the imposition of this rule would be a burden.
    The CAA requires EPA to impose this rule on any source with more 
than a threshold quantity of a regulated substance. Therefore, EPA 
cannot exempt ammonia refrigeration systems that contain more than 
10,000 pounds of ammonia. In addition, ammonia refrigeration plants 
have had a substantial number of accidents where the ammonia has 
migrated offsite, indicating that these systems do pose a risk to the 
public. At the same time, it should be noted that all of these 
refrigeration systems are already covered by the OSHA PSM standard. 
Consequently, the only additional steps sources will have to take are 
to conduct the hazard assessment, comply with the emergency response 
requirements, and file the RMP. EPA worked with the International 
Institute of Ammonia Refrigeration to develop a model risk management 
program that will facilitate compliance and reduce the burden on 
sources (Model Risk Management Program for Ammonia Refrigeration). For 
most of these sources, which have only one chemical, the RMP will be a 
very brief document.
    4. Other Operations. Comments were submitted on a range of other 
industries.
    The warehouse industry said that it should be exempted where 
material is received and shipped in packages that are not opened; 
commenters noted that they are covered by DOT packaging regulations. 
EPA believes that warehouses must be covered if they have more than a 
threshold quantity of a regulated substance. Under the OSHA definition 
of process, which EPA has adopted, packages of a substance stored in 
the same room may be counted toward the threshold quantity if the 
packages could release their contents in the same event. EPA notes that 
warehouse fires have created major incidents in the past 10 years, and 
the Agency believes that warehouses should take the steps necessary to 
prevent and mitigate such incidents. EPA is interested in working with 
the industry to create a model risk management program that would help 
sources develop a hazard assessment process that can account for 
potentially changing contents of a warehouse.
    Batch processors face related problems with changing chemicals on 
site. EPA is willing to work with industry to develop a generic 
approach to risk management programs. EPA believes, however, that most 
batch processors will already be covered by OSHA PSM. The RMP Offsite 
Consequence Analyses Guidance will reduce the burden of developing 
multiple release scenario analyses. To minimize the need for continual 
revision of their worst-case scenario to accommodate periodic inventory 
changes, sources such as warehouses and batch processors may want to 
analyze their expected chemical inventory in developing a scenario that 
represents the worst case for the foreseeable future, even if the 
substance is not currently in use at the source.
    A number of commenters raised questions about coverage of POTWs. A 
specific concern was EPA's statement in the NPRM that substances in 
waste streams would not be covered by the rule. This statement is based 
on the belief that the regulated toxic substances will not constitute 
more than one percent of any waste stream received by a POTW. 
Consequently, they will not be considered in calculations of threshold 
quantities. No waste stream is likely to meet EPA's flammability 
criteria. POTWs are likely, however, to be covered because of regulated 
substances they use to treat wastes.

R. Implementing Agency Delegation

    EPA received a number of comments to the NPRM regarding the role 
and potential burden on LEPCs, SERCs, and other local agencies that may 
result from implementation of the risk management program. In the SNPRM 
preamble, EPA indicated that EPA and the states share the 
responsibility for protecting public health and the environment and 
encouraged state and local agencies to seek delegation for this program 
because their participation is essential to successful chemical 
accident prevention, preparedness and response and recognized by the 
legislative history and the CAA section 112(r) requirements by 
requiring that RMPs be submitted to states and local planning entities. 
States are already involved in chemical emergency preparedness and 
planning through the requirements of EPCRA.
    Commenters on the SNPRM requested that the final rule clearly state 
that EPA is the implementing agency unless a state or local agency is 
granted a

[[Page 31704]]

delegation of authority under section 112(l). Several commenters 
indicated that EPA should allow states the flexibility to designate the 
most appropriate implementing agency, such as OSHA or the state agency 
that administers and enforces the OSHA PSM standard, rather than 
mandating the air permitting authority or a SERC agency in the final 
rule. A number of commenters on the SNPRM and NPRM suggested that 
existing local emergency planning agencies (e.g., LEPCs, fire 
departments) would be best suited to serve as implementing agencies, in 
part because they are closest to the communities at risk. However, many 
commenters (including LEPCs that commented) argued that LEPCs would be 
unprepared to take on such a burden and that even a minimal role in 
implementing section 112(r), including mere storage of RMPs, would 
overwhelm their limited resources and technical expertise. In addition, 
commenters indicated that LEPCs, as mostly volunteer agencies, would 
not and could not have the authority necessary to implement and enforce 
the RMP rule.
    The implementing agency is the state or local agency that obtains 
delegation of the section 112(r) program under section 112(l). As 
stated in the definition of Implementing Agency in today's rule, until 
a state or local agency is granted delegation of the risk management 
program under CAA section 112(l), EPA will serve as the implementing 
agency. States may select any state or local agency to implement this 
program, including an air permitting authority or a state OSHA program, 
provided the agency has the expertise, legal authority and resources to 
implement the program; the state must also have the authority to 
enforce the program. EPA realizes that, in most cases, LEPCs will not 
have the authority to be implementing agencies, but they should be 
involved as much as possible in the program.
    Commenters on the SNPRM suggested that EPA should avoid adding 
specific implementation details to the final rule so that states would 
have the flexibility to develop or continue programs that meet local 
needs. Other commenters, however, suggested that EPA should issue 
delegation guidance and to define the elements of an adequate state 
program to avoid inconsistent interpretations and implementation of the 
rule. Commenters representing companies that operate in several states 
were particularly concerned about maintaining uniform implementation.
    EPA has not added specific state or local implementation 
requirements to today's rule because the Agency already promulgated 
sufficient provisions for delegation of accident prevention programs 
under section 112(r) to states and local authorities under 40 CFR part 
63, subpart E, which implements CAA Sec. 112(l). As EPA discussed in 
the SNPRM, implementing agencies will be responsible for such tasks as 
reviewing RMP information, auditing and inspecting a percentage of 
sources annually, requiring revisions to the RMP as necessary, and 
assisting the permitting authority in ensuring compliance. States have 
the flexibility to implement their own programs, however the CAA 
requires that state or local program requirements must be as stringent 
as EPA's and must include EPA regulated substances and processes. This 
means that California, Delaware, Nevada, and New Jersey will need to 
revise their existing program requirements, substance lists, and in 
some cases, thresholds, to meet EPA's requirements and to obtain 
section 112(r) delegation. EPA intends to issue additional guidance 
that will help state and local agencies obtain program delegation. EPA 
must review delegation requests submitted under 40 CFR part 63, subpart 
E to ensure that state and local programs requirements are as stringent 
as EPA's. With respect to nationwide uniform implementation, EPA notes 
that the CAA specifically grants states the right to develop more 
stringent requirements; consequently, there may be state-to-state 
variations. Many states, however, are prohibited under their state laws 
from adopting regulations that are more stringent than Federal rules.
    One commenter on the NPRM indicated that EPA's estimation of the 
costs of implementing the section 112(r) program is extremely low, 
representing demands that are 65 to 75 percent lower than those 
experienced by states implementing similar programs. LEPCs and state 
governments were concerned about the imposition of section 112(r) 
requirements on state and local governments as an unfunded mandate. 
Several state agencies indicated that the considerable financial burden 
imposed by section 112(r) implementation would prohibit them from 
seeking section 112(l) delegation. Commenters encouraged EPA to develop 
guidance on potential funding mechanisms, including descriptions of the 
fee systems used by existing state programs for accidental release 
prevention. Several commenters indicated that the political climate at 
the state and local level would make it impossible to levy new, or 
raise existing, fees.
    Since states are not required to seek delegation of this program, 
it does not constitute an unfunded mandate (see also section V.C). 
Before EPA grants delegation, state or local agencies must show that 
they have the resources to implement and enforce the risk management 
program rules. EPA recognizes that there is no Federal funding 
associated with implementation of section 112(r) but believes that the 
tiered program levels and centralized electronic submission of RMPs in 
today's rule substantially reduces the cost and resource demand for 
state and local entities seeking delegation. State and local agencies 
that fully implement section 112(r) will be able to develop and operate 
a program that best fits their individual needs, resources, and 
structures. As part of consideration of the costs to implement section 
112(r), state and local agencies should also weigh the benefits of 
integrating accident prevention with pollution prevention, 
environmental protection, and worker and public health and safety at 
the state level, and the benefits to local industry associated with 
state, rather than Federal, implementation of this program. Many states 
and local agencies have established a close working relationship with 
the sources in their jurisdiction. In addition, a number of state and 
local publicly owned sources are covered by this rule; state 
implementation can serve to enhance compliance that may otherwise 
require increased coordination with EPA. Although other states have 
successfully ``self-funded'' their accident prevention programs with 
various state authorized fees, EPA recognizes that it may be difficult 
for state or local agencies to generate the resources necessary to fund 
full section 112(r) implementation.
    Several commenters on the SNPRM requested guidance and training for 
sources, local entities, and implementing agencies on understanding 
hazard assessments, and conducting program inspections, reviews, and 
audits. EPA recognizes the need for guidance and training for 
implementing agencies and sources. EPA plans to modify and to continue 
offering its four-day Chemical Safety Audit workshop to other federal 
agency representatives, state and local government officials, and 
industry representatives as an introduction to chemical process safety, 
current industry chemical accident prevention practices and 
understanding the elements of the risk management program. EPA is ready 
to assist state and local agencies through its regional offices to 
coordinate state and local

[[Page 31705]]

programs and to help in obtaining program delegation and development of 
resources to fund state or local programs. Region 4 in Atlanta, 
Georgia, for example, has developed an integrated section 112(r) work 
group of state and local air pollution control, SERC, and LEPC 
representatives who participate in workshops, seminars, and pilot 
studies designed to foster local program implementation and to build a 
support network. EPA also continues to work with NOAA to enhance 
modeling and information management tools contained in the Computer 
Aided Management of Emergency Operations (CAMEO) and Areal Locations of 
Hazardous Atmospheres (ALOHA) software for local emergency planners and 
responders.
    Two commenters on the NPRM requested that EPA address the issue of 
tort liability in the event that an accidental release occurs after an 
RMP has been submitted to the implementing agency. One other commenter 
believed that the implementing agency must be held accountable for RMP 
content while another believed that EPA must ensure that adequate 
limits to implementing agency liability exist.
    The primary responsibility for accident prevention rests with the 
owners or operators of sources. Section 112(r) does not create a basis 
for implementing agency tort liability under federal law. CAA 
Sec. 112(r)(1). When EPA is the implementing agency, it is immune from 
tort liability under state law. States that are implementing agencies 
generally will have protection from liability under their state laws. 
If a state has waived its sovereign immunity, EPA cannot take steps to 
alter that situation. EPA encourages states concerned about this issue 
to discuss the matter with their attorneys general to determine whether 
state law protects them from liability.

S. Accident Information Reporting

    In the SNPRM, EPA discussed the possibility of additional accident 
reporting to support a variety of future accident prevention 
activities. EPA proposed that sources either submit an OSHA PSM or 
Program 3 investigation report for certain accidental releases or a 
survey form that collects certain accident data. Otherwise EPA could 
use existing authorities to collect additional accident data from 
existing information, as needed.
    Most commenters opposed EPA's proposal for additional accident 
reporting requirements, especially the collection of accident 
investigations prepared under Program 3 or OSHA PSM, because it 
increases costs, it would have no benefit, it generates significant 
liability issues, and it would divert limited resources away from 
activities with greater public health benefit. Commenters supported the 
use of existing reports since this approach should not generate an 
additional burden, such reports are available through EPA and OSHA 
under other regulations and they should be adequate for the objectives 
outlined by EPA.
    EPA agrees with commenters and has decided not to adopt any 
additional accident reporting requirements. EPA will rely on the five-
year accident history for the immediate future and, based on that 
information, determine whether additional information and requirements 
are needed. EPA has the authority under CAA section 114 to investigate 
releases and seek additional information as needed.

T. Other Issues

    1. OSHA VPP. In the SNPRM, EPA asked whether the OSHA Voluntary 
Protection Program (VPP) protects public health and the environment and 
suggested that one approach to third party review (discussed below) 
would be to assign sources that participate in VPP to Program 2. Many 
commenters supported VPP participation as a criterion for assigning a 
source to Program 2. Several of these commenters noted, however, that 
because VPP sources are probably already covered by OSHA PSM, assigning 
them to Program 2 would provide no reduction in burden or regulatory 
relief. One commenter suggested that EPA could allow VPP sources the 
flexibility to determine, with the LEPC, what the offsite consequence 
analysis would cover. Seven commenters opposed VPP participation as a 
Program 2 criterion because VPP does not address offsite consequences, 
no evidence was presented that PSM is being carried out adequately at 
VPP sources, and this approach would discriminate against other 
voluntary programs.
    After consideration of the comments, EPA has decided not to use VPP 
participation as a Program 2 criterion, but has adopted language in the 
final rule to exempt sources with a Star or Merit ranking under OSHA's 
VPP from selection for audits based on the criteria in Sec. 68.220 
(b)(2) and (b)(7); such a source may be audited if it has an accidental 
release that requires an accident investigation under these 
regulations. This decision recognizes that such sources have active 
accident prevention programs and should not be regarded in the same way 
as other sources within the same industry or as other sources in 
general. In addition, it thus provides a similar degree of benefit with 
respect to EPA auditing as it does with respect to OSHA auditing. EPA 
agrees that VPP sources would gain no benefit by assignment to Program 
2. EPA does not believe it is appropriate to adjust the hazard 
assessment requirements for VPP sources; this information is essential 
to local emergency preparedness and response and for public dialogue.
    2. Qualified Third Party. In the SNPRM, EPA sought comments on 
whether sources should be allowed to have qualified third parties 
assist them in achieving and maintaining compliance. Eight commenters 
supported third party reviews as a way to reduce implementing agency 
efforts. One commenter stated that sources should be required to hire a 
qualified third party to assess their activities. Most commenters, 
however, expressed some reservations including greater cost if sources 
were required to hire third parties, when many sources already have 
staff qualified to implement the risk management program. Commenters 
said that a third party review would be particularly costly for 
retailers who will have model programs and stated that use of third 
parties would add another layer of bureaucracy to the process. A number 
of commenters said that EPA should fund third parties. Commenters also 
stated that use of third parties might confuse the issue of who was 
responsible for safety and for enforcement; they said that EPA must 
make it clear that the owner or operator of the source remains 
responsible for accidents and that the implementing agency retains 
enforcement authority. Finally, several commenters asked who would 
determine the qualifications of a qualified third party.
    EPA is not requiring use of qualified third parties in this rule. 
EPA, however, endorses the concept of offering sources the option of 
using third parties to assist owner/operators in meeting their 
obligations under the rule. Based on the comments, EPA recognizes that 
any third party proposal must:
     Not weaken the compliance responsibilities of source 
owner/operators;
     Offer cost savings and benefits to the industry, 
community, and implementing agencies that significantly exceed the cost 
of implementing the qualified third party approach;
     Lead to a net increase in process safety, particularly for 
smaller, less technically sophisticated sources; and
     Promote cost-effective agency prioritization of 
implementing agency oversight resources.

[[Page 31706]]

    Several key issues need further discussion before the use of a 
qualified third party may be offered as an option. These include 
qualification criteria, certification procedures, liability, and other 
critical issues associated with the use of a qualified third party. 
Therefore, following promulgation of this rule, EPA proposes to call a 
meeting to solicit input from trade associations, professional and 
technical societies, states, and other interested parties to address 
these issues and investigate the need for developing a process and a 
national exam to qualify third parties.
    3. Documentation. Commenters expressed a number of concerns about 
the level of recordkeeping and the availability of information. Some 
commenters stated that records need to be maintained for longer than 
five years; commenters suggested 10 years, 20 years, and the life of 
the source. One commenter suggested that records should be kept for the 
life of the process and then seven years thereafter to ensure that 
records would be available if a lawsuit was initiated. Industry 
commenters said that only current documents and data should be 
maintained to prevent confusion from having multiple versions of the 
same document. One commenter stated that policies and procedures should 
be kept until they are superseded, then they should be destroyed; 
retaining old, superseded information is unsafe and unacceptable and 
can result in accidents.
    One commenter said that sources should be required to develop and 
maintain a master index or catalogue of documents relevant to the 
proposed rule to support public access. Another commenter stated that, 
in addition to maintaining records supporting the implementation of the 
risk management program, the owner or operator should submit the 
records to the implementing agency. A third commenter said that the 
rule should require that all records supporting compliance with the 
rule be organized and readily available through the designated contact 
person at the source to the implementing agency for inspection.
    Other commenters said the proposed recordkeeping was excessive. One 
stated that EPA is forcing industries towards ``defensive universal 
recordkeeping,'' retaining mountains of documents because EPA has not 
specified what records need to be kept. Another commenter said that an 
examination of the proposal indicated that no fewer than about 22 
separate written documents are required to be maintained on site or 
submitted to the responsible regulatory agency and other parties. One 
commenter noted that more resources will be spent on filling out 
paperwork than on actual spill prevention.
    In the final rule, EPA has adopted the OSHA PSM language for 
Program 3 processes; therefore, documentation for PSM elements is 
dictated by that rule. For other elements of the risk management 
program and for processes in other tiers, EPA has set a period of five 
years for the maintenance of supporting documentation. EPA agrees with 
commenters that only current versions of documents and procedures 
should be retained. On the issue of records submitted to the 
implementing agency, EPA believes that the provisions outlined in the 
final rule (as described in Subpart G to part 68) will limit the volume 
of such documentation. The implementing agency and EPA will have access 
to all on-site documentation when needed. Much of the on-site 
documentation will be confidential and protected under Section 114(c) 
of the CAA. The burden on the implementing agency will be substantially 
reduced because it will not have to establish protected trade secret 
files and procedures.
    Finally, EPA agrees with commenters that level of recordkeeping 
should be kept as low as possible consistent with EPA's statutory 
mandate. EPA has reduced the documentation requirements for Program 2 
processes (particularly with respect to the prevention program) because 
it believes that for these sources, the benefit of the records does not 
offset the cost of creating and maintaining files.

IV. Section-by-Section Analysis of the Rule

    This section discusses specific changes to the rule that are not 
otherwise described in this preamble. The rule has been renumbered to 
include new sections and subparts. The hazard assessment requirements 
have been divided into separate sections in subpart B. The Program 2 
prevention program requirements are in subpart C; Program 3 prevention 
program elements are in Subpart D. Emergency response requirements are 
in subpart E, RMP requirements in subpart G. The registration 
requirement, proposed Sec. 68.12, has been moved to the RMP subpart. 
Tables 3 and 4 present the distribution of NPRM and SNPRM sections and 
derivation of final rule sections.

                      Table 3.--Distribution Table                      
------------------------------------------------------------------------
        NPRM and SNPRM citations               Final rule citations     
------------------------------------------------------------------------
68.3   Definitions.....................  68.3   Definitions.            
68.10  Applicability...................  68.10  Applicability.          
68.12  Registration....................  68.160  Registration.          
68.13  No Impact Sources (Tier 1)......  68.10(b)  Applicability.       
                                         68.12(b)  General Requirements.
68.14  Streamlined Risk Management       Subpart C Program 2 Prevention 
 Program (Tier 2).                        Program (68.48-68.60).        
68.15  Hazard Assessment...............  Subpart B Hazard Assessment    
                                          (68.20-68.42).                
68.20  Prevention Program--Purpose.....  Deleted.                       
68.22  Prevention Program--Management    68.15  Management.             
 System.                                                                
68.24  Prevention Program--Process       68.67  Process Hazard Analysis.
 Hazard Analysis.                                                       
68.26  Prevention Program--Process       68.65  Process Safety          
 Safety.                                  Information.                  
68.28  Prevention Program--Standard      68.69  Operating Procedures.   
 Operating Procedures.                                                  
68.30  Prevention Program--Training....  68.71  Training.               
68.32  Prevention Program--Maintenance   68.73  Mechanical Integrity.   
 (mechanical integrity).                                                
68.34  Prevention Program--Pre-Startup   68.77  Pre-Startup Review.     
 Review.                                                                
68.36  Prevention Program--Management    68.75  Management of Change.   
 of Change.                                                             
68.38  Prevention Program--Safety        68.58  Compliance Audits.      
 Audits.                                                                
                                         68.79  Compliance Audits.      
68.40  Prevention Program--Accident      68.60  Incident Investigation. 
 Investigation.                                                         
                                         68.81  Incident Investigation. 
68.45  Emergency Response Program......  68.95  Emergency Response      
                                          Program.                      

[[Page 31707]]

                                                                        
68.50  Risk Management Plan............  Subpart G Risk Management Plan 
                                          (68.150-68.190).              
68.55  Recordkeeping Requirements......  68.200  Recordkeeping.         
68.58  Permit Content and Air            68.215  Permit Content and Air 
 Permitting Authority Requirements.       Permitting Authority or       
                                          Designated Agency             
                                          Requirements.                 
68.60  Audits..........................  68.220  Audits.                
------------------------------------------------------------------------

                       Table 4.--Derivation Table                       
------------------------------------------------------------------------
          Final rule citations               NPRM and SNPRM citations   
------------------------------------------------------------------------
68.3   Definitions.....................  68.3   Definitions.            
68.10  Applicability...................  68.10  Applicability, SNPRM    
                                          68.13.                        
68.12  General Requirements............  SNPRM 68.13, 68.14.            
68.15  Management......................  68.22  Prevention Program--    
                                          Management.                   
68.20  Applicability (Hazard             68.10  Applicability.          
 Assessment).                                                           
68.22  Offsite Consequence Analysis      68.15(e) Hazard Assessment.    
 Parameters (Hazard Assessment).                                        
68.25  Worst-Case Release Analysis       68.15(c) Hazard Assessment.    
 (Hazard Assessment).                                                   
68.28  Alternative Release Analysis      68.15(d) Hazard Assessment.    
 (Hazard Assessment).                                                   
68.30  Defining Offsite Impacts--        68.15(e)(3) Hazard Assessment. 
 Population (Hazard Assessment).                                        
68.33  Defining Offsite Impacts--        68.15(e)(4) Hazard Assessment. 
 Environment (Hazard Assessment).                                       
68.36  Review and Update (Hazard         68.15(g) Hazard Assessment.    
 Assessment).                                                           
68.39  Documentation (Hazard             68.15(h) Hazard Assessment.    
 Assessment).                                                           
68.42  Five-year Accident History        68.15(f) Hazard Assessment.    
 (Hazard Assessment).                                                   
68.48  Safety Information (Program 2)..  68.14(b) Streamlined Risk      
                                          Management Program (Tier 2);  
                                          68.26 Process Safety          
                                          Information.                  
68.50  Hazard Review (Program 2).......  68.14(b) Streamlined Risk      
                                          Management Program (Tier 2);  
                                          68.24 PHA.                    
68.52  Operating Procedures (Program 2)  68.14(b) Streamlined Risk      
                                          Management Program (Tier 2);  
                                          68.28 SOPs.                   
68.54  Training (Program 2)............  68.14(b) Streamlined Risk      
                                          Management Program (Tier 2);  
                                          68.30 Training.               
68.56  Maintenance (Program 2).........  68.14(b) Streamlined Risk      
                                          Management Program (Tier 2);  
                                          68.32 Maintenance.            
68.58  Compliance Audits (Program 2)...  68.38  Prevention Program--    
                                          Safety Audits.                
68.60  Incident Investigation (Program   68.40  Prevention Program--    
 2).                                      Incident Investigation.       
68.65  Process Safety Information        68.26  Prevention Program--    
 (Program 3).                             Process Safety.               
68.67  Process Hazard Analysis (Program  68.24  Prevention Program--    
 3).                                      Process Hazard Analysis.      
68.69  Operating Procedures (Program 3)  68.28  Prevention Program--    
                                          Standard Operating Procedures.
68.71  Training (Program 3)............  68.30  Prevention Program--    
                                          Training.                     
68.73  Mechanical Integrity (Program 3)  68.32  Prevention Program--    
                                          Maintenance (mechanical       
                                          integrity).                   
68.75  Management of Change (Program 3)  68.36  Prevention Program--    
                                          Management of Change.         
68.77  Pre-Startup Review (Program 3)..  68.34  Prevention Program--Pre-
                                          Startup Review.               
68.79  Compliance Audits (Program 3)...  68.38  Prevention Program--    
                                          Safety Audits.                
68.81  Accident Investigation (Program   68.40  Prevention Program--    
 3).                                      Accident Investigation.       
68.83  Employee Participation (Program   68.24(f) Process Hazard        
 3).                                      Analysis.                     
68.85  Hot Work Permit (Program 3).....  NPRM Preamble (58 FR 54205).   
68.87  Contractors (Program 3).........  NPRM Preamble (58 FR 54205).   
68.90  Applicability (Emergency        
FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
  68.45(a) Emergency Response    
 Response).                               Program.                      
68.95  Emergency Response Program......  68.45(b)-(f) Emergency Response
                                          Program.                      
68.150  Submission (Risk Management      68.50(a) Risk Management Plan. 
 Plan).                                                                 
68.155  Executive Summary (Risk          68.50(a) Risk Management Plan. 
 Management Plan).                                                      
68.160  Registration (Risk Management    68.12  Registration.           
 Plan).                                                                 
68.165  Offsite Consequence Analysis     68.50(c) Risk Management Plan. 
 (Risk Management Plan).                                                
68.168  Five-Year Accident History       68.15(f) Hazard Assessment.    
 (Risk Management Plan).                                                
68.170  Prevention Program/Program 2     68.14(b) Streamlined Risk      
 (Risk Management Plan).                  Management Program (Tier 2);  
                                          68.50(g).                     
68.175  Prevention Program/Program 3     68.50(g) Risk Management Plan. 
 (Risk Management Plan).                                                
68.180  Emergency Response Program       68.50(e) Risk Management Plan. 
 (Risk Management Plan).                                                
68.185  Certification (Risk Management   68.50(g) Risk Management Plan. 
 Plan).                                                                 
                                         68.13(a) No Impact Sources.    
68.190  Updates (Risk Management Plan).  68.50(h) Risk Management Plan. 
68.200  Recordkeeping..................  68.55  Recordkeeping           
                                          Requirements.                 
68.210  Availability of Information to   42 U.S.C. 7412.                
 the Public.                                                            
68.215  Permit Content and Air           68.58  Permit Content and Air  
 Permitting Authority or Designated       Permitting Authority          
 Agency Requirements.                     Requirements.                 
68.220  Audits.........................  68.60  Audits.                 
Appendix A--Table of Toxic Endpoints...  68.15(h)(3)(iii) Hazard        
                                          Assessment.                   
------------------------------------------------------------------------

    Section 68.3, Definitions, has been revised to add or delete a 
number of definitions. A definition of administrative controls has been 
added that is derived from the definition used

[[Page 31708]]

by the Center for Chemical Process Safety (CCPS).
    The definition of analysis of offsite consequences has been 
deleted.
    A definition of catastrophic release has been added that is adapted 
from OSHA's definition of catastrophic release (29 CFR 1910.119); 
OSHA's language on danger to employees in the workplace has been 
changed to imminent and substantial endangerment to public health and 
the environment.
    A definition of classified information has been added. The 
definition is adopted from the Classified Information Procedures Act.
    The proposed definition of covered process is unchanged.
    The proposed definition of designated agency has been revised to 
indicate that the state, not the state air permitting authority, shall 
select an agency to conduct activities required by Sec. 68.215.
    As discussed above, a definition of environmental receptor has been 
added to list the receptors of concern.
    The definition of full-time employee has been deleted.
    A definition of hot work has been adopted verbatim from the OSHA 
PSM standard.
    The definition of implementing agency is adopted as proposed in the 
SNPRM.
    A definition of injury has been added.
    A definition of major change has been added to clarify the types of 
changes that necessitate actions to manage change. The definition will 
help sources understand when they are required to take steps to review 
their activities for new hazards.
    A definition of mechanical integrity has been added to clarify the 
requirements of maintenance sections.
    A definition of medical treatment has been added to clarify what 
constitutes an injury. The definition is adapted from an OSHA 
definition used by sources in logging occupational injuries and 
illnesses.
    The proposed definition of mitigation has been changed by adding a 
definition of active mitigation.
    A definition of offsite has been changed to clarify that areas 
within the source would be considered offsite if the public has routine 
and unrestricted access during or outside of business hours. Areas 
within a source's boundaries that may be considered offsite are public 
roads that pass through sections of the site and natural areas owned by 
the source to which the public has unrestricted access. For some sites, 
parking lots within the boundary may be offsite if the source cannot 
restrict access.
    A definition of population has been added. Population is defined as 
the public.
    A definition of public has been added to state that all persons 
except employees and contractors at the stationary source are members 
of the public. A number of commenters stated that employees at other 
facilities should not be considered part of the public. EPA disagrees 
because these employees may not be trained in protective actions or 
have protective equipment appropriate for releases from covered 
processes.
    A definition of public receptor has been added. Some commenters 
stated that EPA should include public roads within this definition. EPA 
decided that inclusion of public roads was unwarranted. EPA recognizes 
that people on public roads may be exposed during a release. In most 
cases, however, vehicles on public roads will be able to leave the area 
quickly and further access can be blocked, especially in isolated 
areas. If public roads were included, almost no sources would be 
eligible for Program 1 because there will be public roads leading to 
the source. In those cases where public roads are heavily traveled, 
there will be other public receptors near the source and, therefore, 
the source's processes will not qualify for Program 1.
    OSHA's definition of replacement in kind has been adopted.
    The definition of significant accidental release has been deleted.
    A definition of typical meteorological conditions has been added 
which means the temperature, wind speed, cloud cover, and atmospheric 
stability class prevailing at the source. Data on the first three of 
these are available from local meteorological stations (e.g., 
airports). Atmospheric stability class can be derived from cloud cover 
data.
    The definition of worst-case release has been revised to clarify 
that the release is the one that leads to the greatest distance to the 
applicable endpoint.
    Section 68.10, Applicability, has been revised to change the term 
``tier'' to ``Program.'' The section now details the eligibility 
criteria for all three programs. Paragraph (a) has been revised to be 
consistent with statutory language on compliance dates. Sources must 
comply with the requirements by June 21, 1999, three years after EPA 
first lists a substance, or the date on which a source first becomes 
subject to this part, whichever is latest. After June 21, 1999, sources 
that begin using a regulated substance that has been listed for at 
least three years must be in compliance with the requirements of part 
68 on the day they bring the substance on site above a threshold 
quantity.
    The Program 1 eligibility requirements have been revised to clarify 
that the criteria are applied to a process, not the source as a whole, 
as discussed above. EPA has deleted requirements for explosives because 
the Agency is proposing to delist explosives. The types of accidents 
that will disqualify a process from Program 1 are now specified in the 
rule as those accidental releases of a regulated substance that led to 
offsite exposure to the substance, its reaction products, overpressure 
generated by an explosion involving the substance, or radiant heat 
generated by a fire involving the substance which resulted in offsite 
death or injury (as defined by the rule), or response or restoration 
activities at an environmental receptor. These accidental release 
criteria eliminate the need for a definition of significant accidental 
release, which has been deleted. Offsite environmental response or 
restoration would include such activities as collection, treatment and 
disposal of soil, shutoff of drinking water, replacement of damaged 
vegetation, or isolation of a natural areas due to contamination 
associated with an accidental release. The distance calculation 
equation for flammables has been dropped, and the worst-case release 
endpoint for flammables is specified which allows the source to use the 
reference tables or their own methodology to determine the distance to 
the endpoint. The requirement that the community have an EPCRA 
emergency response plan has been replaced by a requirement that the 
source coordinate emergency response procedures with local community 
responders.
    As discussed above, the eligibility criteria for Program 2 and 3 
have been changed. Both apply to processes, not sources.
    Paragraph (e) states that if a process no longer meets the 
eligibility criteria of its Program level, the source must comply with 
the requirements of the new Program level and the update the RMP 
according to Sec. 68.190. This paragraph clarifies the responsibility 
of the source when a process becomes ineligible for a Program level 
(e.g., public receptors move within the distance to an endpoint for a 
Program 1 process or OSHA changes the applicability of its PSM 
standard).
    Proposed Sec. 68.12, Registration, has been dropped. Registration 
requirements are now part of the RMP requirements in subpart G, 
Sec. 68.160.
    New Sec. 68.12, General Requirements, has been added to provide a 
roadmap

[[Page 31709]]

for sources to use to identify the requirements that apply to processes 
in each of the three tiers. The Program 1 requirements, in proposed 
Sec. 68.13, have been included in this section. Owners or operators of 
Program 1 processes are required to analyze and document in the RMP the 
worst-case release to ensure that they meet the eligibility criteria of 
no public receptors within the distance to the endpoint. As discussed 
above, the requirement to post signs has been dropped. The 
certification statement has been revised to be consistent with the 
eligibility requirements. If a source has more than one Program 1 
process, a single certification may be submitted to cover all such 
processes.
    The Program 2 requirements specify the sections of the rule that 
apply to these processes.
    The Program 3 requirements specify the sections of the rule that 
apply to these processes.
    Proposed Sec. 68.22, Management, has been moved from the prevention 
program to Sec. 68.15 in subpart A-General. The section has been 
adopted as proposed except that the purpose sentence in paragraph (a) 
has been dropped and a phrase at the beginning of paragraph (b) has 
been deleted as unnecessary.
    A new subpart B has been created to cover the hazard assessment 
requirements. The proposed Sec. 68.15 has been divided into separate 
sections to cover the parameters, the different types of analyses, the 
identification of offsite populations and environments, documentation 
and updates, and the five-year accident history. EPA believes that 
limiting each section to a single topic will make the rule easier to 
understand.
    Section 68.20 has been added to specify which hazard assessment 
requirements apply to Program 1, 2, and 3 processes. All sources are 
required to complete a worst-case release analysis for regulated 
substances in covered processes, based on the requirements of 
Sec. 68.25. Program 2 and 3 processes must also perform alternative 
release analyses required by Sec. 68.28. All sources must complete the 
five-year accident history for all covered processes.
    A new Sec. 68.22 has been added to list the parameters to be used 
in the offsite consequence analyses. Owners or operators who choose to 
use their own air dispersion modeling tools must use the parameters 
specified in paragraphs (a), (e), (f), and (g) of this section; they 
must use the meteorological parameters specified in paragraph (b) of 
this section unless they can demonstrate that the conditions do not 
exist at their site. Paragraph (c) specifies the ambient temperature 
and humidity for worst case (highest daily maximum over the previous 
three years and average humidity); if a source uses the guidance, it 
may use average temperature and humidity (25 deg. C and 50 percent) as 
default values. EPA recognizes that these values are less conservative 
than the worst-case meteorological conditions, but determined that they 
represent a reasonable average to be used for developing tables. 
Providing tables for a variety of temperatures and humidity would have 
made the guidance much more voluminous and difficult to use. EPA is 
requiring sources that use dispersion models instead of the guidance to 
use actual temperature and humidity data applicable to the site. EPA 
believes this approach represents a reasonable tradeoff. The guidance 
generates conservative results even with the less conservative 
assumptions about temperature and humidity; air dispersion modeling 
will generally produce less conservative results and, therefore, should 
be based on actual data for these variables. Average data applicable to 
the source may be used for alternative scenarios. Paragraph (d) 
requires that the release height for worst-case be at ground level 
(zero feet). Paragraph (e) specifies that urban or rural topography be 
used as appropriate in modeling. Paragraph (f) requires sources to use 
models or tables appropriate for the density of the substance being 
released (e.g., dense gases must be modeled using tables or models that 
account for the behavior of dense gases). Dense gases are typically 
those that are heavier than air as well as those that form aerosols and 
behave as if they are heavier than air upon release. For worst-case 
releases, liquids (other than gases liquefied by refrigeration only) 
shall be considered to be released at the highest daily maximum 
temperature or at process temperature, whichever is higher. For 
alternative scenarios, substances may be considered to be released at 
ambient or process temperatures as appropriate. Owners or operators may 
choose to use EPA's RMP Offsite Consequence Analysis Guidance for their 
offsite consequence analyses. All of the parameters specified here are 
reflected in this guidance.
    A new Sec. 68.25 has been added on the worst-case release analysis. 
As discussed above, the section requires one worst-case release for 
toxics and one for flammables. If additional scenarios, for either 
class of substances, would potentially expose receptors not exposed by 
the worst-case release, the additional scenario shall be analyzed and 
reported. This provision is to take into account the possibility that 
at large sources, vessels at opposite ends of the source may expose 
different populations.
    The section specifies how maximum quantity in a vessel or pipe is 
to be determined, the scenarios to be considered for toxic gases, toxic 
gases liquefied by refrigeration only, toxic liquids, and flammables, 
the parameters to be used, consideration of passive mitigation, and 
factors to be considered in selecting the worst-case scenario. The 
section also specifies that sources may use proprietary models if the 
source provides the implementing agency access to the model and 
explains differences between the model and publicly available models, 
if requested. This approach will allow sources to use the most 
appropriate models available, while preserving the transparency of the 
results.
    A new Sec. 68.28 has been added on alternative release scenario 
analysis. As discussed above, the section requires one alternative 
release analysis for all flammables held above the threshold in 
processes at the source and one alternative release analysis for each 
toxic held above the threshold in processes. For each scenario, the 
owner or operator shall select a scenario that is more likely to occur 
than the worst case; and that will reach an endpoint offsite, unless no 
such scenario exists. The section includes a list of scenarios that 
owners/operators may want to consider, but does not dictate a 
particular scenario. EPA has provided additional direction and 
suggestions for defining these scenarios in the RMP Offsite Consequence 
Analysis Guidance. As noted above, the section references the 
parameters to be used and allows consideration of both passive and 
active mitigation systems. The section specifies factors to be 
considered in selecting alternative scenarios; specifically, sources 
shall consider releases that have been documented in the five-year 
accident history; or failure scenarios identified through the PHA or 
hazard review.
    A new Sec. 68.30 has been added on defining offsite impacts--
population. The section specifies that populations are to be defined 
for a circle with a radius that is the distance to the endpoint. Owners 
or operators are required only to estimate the residential population 
within the circle to two significant digits and may use Census data to 
make these estimates. Owners or operators are also required to note, in 
the RMP, the presence of any major institutions, such as schools, 
hospitals, prisons, public recreational areas, arenas, and major 
commercial and

[[Page 31710]]

industrial developments, but they are not required to estimate the 
number of people present at such sites. These additional locations are 
those that would normally be shown on area street maps.
    A new Sec. 68.33 has been added on defining offsite impacts to the 
environment. As discussed above, the owners or operators are required 
only to identify any environmental receptors within the circle with a 
radius determined by the distance to the endpoint. The owners or 
operators are not required to assess the potential types or degree of 
damage that might occur from a release of the substance. The 
environmental receptors are those that can be identified on U.S. 
Geological Survey local topographical maps or maps based on U.S.G.S. 
data.
    A new Sec. 68.36 has been added to list the requirements for 
reviewing and updating the offsite consequence analysis. As proposed, 
if no changes occur at the site, the analyses must be reviewed and 
updated at least once every five years. If changes at the site occur 
that would reasonably be expected either to increase or decrease the 
distance to the endpoint by a factor of two or more, owners/operators 
are required to update the offsite consequence analysis within six 
months. The time for the reanalysis has been changed to six months to 
make it consistent with the update requirements for the RMP. The 
proposed requirement for reviewing the analyses based on offsite 
changes has been deleted. A number of commenters objected to the 
requirement because it would have compelled them to track changes over 
very large areas. Because the distance to the endpoints, especially for 
toxics, may be as much as 40 km, the area affected could easily exceed 
1,000 square miles. EPA agreed with commenters that there was little 
benefit from requiring sources to track offsite changes and redo 
analyses because the public is aware of the changes.
    A new Sec. 68.39 has been added to list the documentation related 
to the offsite consequence analyses that must be retained on site. For 
both types of scenarios, the documentation shall include a description 
of the scenarios identified, assumptions and parameters used, the 
rationale for the selection of specific scenarios; assumptions shall 
include use of mitigation and any administrative controls that were 
assumed to limit the quantity that could be released. Documentation 
shall include the effect of the mitigation and controls on the release 
quantity. The documentation shall also include the estimated quantities 
released, release rates, and durations of release. The owners or 
operators shall also identify the methodology used to determine 
distance to endpoints (i.e., EPA's guidance or an air dispersion model) 
and the data used to estimate population and environmental receptors 
potentially affected. EPA has deleted the proposed requirement for 
documentation of endpoints because these are now dictated by the rule. 
EPA has also dropped the requirement for documentation of distance 
calculations; distances will either be determined from EPA's reference 
tables or by an air dispersion model.
    A new Sec. 68.42 has been added to detail the requirements for the 
five-year accident history. As discussed above, the accident history is 
limited to accidental releases of listed substances from covered 
processes only. The only accidental releases that must be included in 
the history are those that resulted in deaths, injuries, or significant 
property damage on site, or known offsite deaths, injuries, 
evacuations, sheltering in place, property damage, or environmental 
damage. Although language related to the types of environmental damage 
listed in the proposed rule has been dropped, EPA intends that 
environmental damage not be limited to environmental receptors; events 
where any known environmental impact of any kind (e.g., fish or animal 
kills, lawn, shrub, or crop damage), should be included in the history.
    The data required on each accident include date, time, and 
approximate duration of the release; chemical(s) released; estimated 
quantity in pounds; the type of release event and its source; weather 
conditions (if known); on-site impacts and known offsite impacts; the 
initiating event and contributing factors (if known); whether offsite 
responders were notified (if known); and operational or process changes 
that resulted from the release. Estimates may be provided to two 
significant digits. EPA expects that for accidents that occur after the 
publication of this rule, sources will be able to document weather 
conditions, initiating events and contributing factors, and 
notification of offsite responders as these items would be part of the 
incident investigation. The Agency recognizes, however, that for 
incidents that occur before the rule is final, sources may not have 
this information unless OSHA PSM already would require the source to 
gather such information (e.g., initiating event and contributing 
factors). EPA has dropped the requirement that the concentration of the 
released substance be reported. Concentration at the point of release 
is assumed to be 100 percent except for substances in solution, where 
the concentration at the point of release is assumed to be the 
percentage of the solution as held or processed. The data provided will 
allow the source or the public to estimate the concentration offsite.
    Because the five-year accident history will initially cover 
releases that occurred before this rule is promulgated, EPA is 
requiring reports on weather conditions only if the source has a 
record. For future releases, EPA encourages the owners or operators 
keep a record of wind speed and temperature if possible as these 
conditions have a significant impact on the migration of a release 
offsite. The rule specifies that the source must document known offsite 
impacts. The source is not required to conduct research on this 
subject, but must report impacts of which it is aware through direct 
reporting to the source or claims filed, or reasonably should have been 
aware of from publicly available information. The source is not 
required to verify the accuracy of public or media reports.
    A new subpart C has been created to include the requirements of the 
prevention program for Program 2 processes.
    New Sec. 68.48 details the safety information that sources will be 
required to develop. The information is a subset of the information 
required under the OSHA rule and is limited to those items that are 
likely to apply to Program 2 processes: MSDSs, maximum intended 
inventory, safe upper and lower process parameters, equipment 
specifications, and the codes and standards used to design, build, and 
operate the process. Because Program 2 processes are generally simple, 
EPA determined that items such as process chemistry, process flow 
diagrams, detailed drawings on equipment, and material and energy 
balances are not necessary for these processes. Evaluation of 
consequences of deviations will be handled under the process review and 
the offsite consequence analysis.
    Paragraph (b) of Sec. 68.48 requires owners or operators to ensure 
that the process is designed in compliance with good engineering 
practices. The paragraph states that compliance with Federal or state 
regulations that address industry-specific safe design or with 
industry-specific design codes may be used to demonstrate compliance. 
NFPA-58 for propane handlers and OSHA's rule for ammonia handling (29 
CFR 1910.111) are examples of such design codes.

[[Page 31711]]

    The final paragraph of Sec. 68.48 requires owners or operators to 
update the safety information if a major change makes it inaccurate.
    New Sec. 68.50 sets the requirements for a hazard review. The 
section lists the hazards and safeguards that the owners or operators 
must identify and review. The section states that owners or operators 
may use checklists, such as those provided in model risk management 
programs, to conduct the review. For processes that are designed to 
industry standards (e.g., NFPA-58) or Federal/state design rules, 
owners or operators need only check their equipment closely to ensure 
that it has been fabricated and installed according to the standards or 
rules and is being operated appropriately. In this case, the standard 
or rule-setting body has, in essence, conducted the hazard review and 
designed the equipment to reduce hazards. Like the PHA required under 
PSM, the hazard review must be documented and the findings resolved. 
The review must be updated at least once every five years or when a 
major change occurs. A streamlined version of the PHA requirement, the 
review recognizes that for simple processes some of the OSHA 
requirements, such as the requirement for a team and a person trained 
in the technique, may not be necessary. Most Program 2 processes will 
have model risk management programs that will assist owners or 
operators in conducting the review.
    New Sec. 68.52 covers operating procedures. The section allows 
owners or operators to use standardized procedures developed by 
industry groups or provided in model risk management programs as a 
basis for the SOPs. Owners or operators will need to review 
standardized SOPs to ensure that they are appropriate for their 
operations; some may need to be tailored. The steps covered in the SOP 
are adapted from the OSHA PSM standard. Certain elements of the PSM 
requirement (e.g., safety and health consideration) were dropped 
because they are generally covered in training provided under the OSHA 
hazard communication standard. Other elements were not included because 
they are covered by other OSHA rules or may not apply to the kinds of 
sources in Program 2. The section requires that the SOPs be updated 
whenever necessary.
    New Sec. 68.54 covers training and is a streamlined version of the 
OSHA PSM requirement. The primary difference with the OSHA PSM training 
element is that the documentation requirements have been dropped. EPA 
believes that for Program 2 sources, which generally will have simple 
processes and few employees involved in the process, the level of 
documentation required by OSHA PSM is not needed. The section 
specifically states that training conducted to comply with other 
Federal or state rules or industry codes may be used to demonstrate 
compliance with the section if the training covers the SOPs for the 
process. Workers must be retrained when SOPs change as a result of a 
major change.
    New Sec. 68.56 covers maintenance and requires owners or operators 
to prepare and implement procedures for maintenance and train workers 
in these procedures. The owners or operators are also required to 
inspect and test process equipment consistent with good engineering 
practices. The OSHA list of equipment has been dropped because it 
seemed too detailed for the simpler Program 2 processes. Similarly, the 
OSHA PSM requirements for documentation, equipment deficiencies, and 
quality assurance seem too burdensome given the type of processes in 
Program 2. EPA emphasizes that sources should address equipment 
deficiencies when they arise.
    New Secs. 68.58 and 68.60 on compliance audits and accident 
investigation are adopted directly from the OSHA PSM standard. EPA 
believes that these two elements are critical to good prevention 
practices and that no changes are needed from the OSHA requirements. 
EPA has added a provision to clearly indicate that audit reports more 
than five-years old need not be retained.
    The Program 3 prevention program is codified in new subpart D. As 
explained above, the subpart adopts the OSHA PSM standard with only 
minor editorial changes necessitated by the different statutory 
authorities of the two agencies. Throughout the subpart, ``employer'' 
has been changed to ``owner or operator,'' ``facility'' to ``stationary 
source,'' and ``highly hazardous chemical'' to ``regulated substance.'' 
EPA has reordered the elements somewhat so that the order reflects the 
progression in which sources will generally implement the program. For 
example, process safety information, which is needed for the PHA, now 
precedes that section. Pre-startup review, which is the last step of 
management of change procedures, now follows management of change. The 
reordering does not reflect any change in the content.
    Section 68.65, process safety information, is adopted directly from 
OSHA. The only changes are the following: references to other 
requirements have been changed to reflect the appropriate EPA section 
numbers; the phrase ``highly hazardous chemical'' has been changed to 
``regulated substance''; the word ``standard'' has been changed to 
``rule'' in paragraph (a); and the date when material and energy 
balances are needed for new processes has been changed to June 21, 
1999. The words ``including those affecting the safety and health of 
employees'' has been deleted from the requirement for the evaluation of 
the consequences of deviations (paragraph (c)(1)(v)) because EPA has no 
authority to regulate the workplace. Further, EPA believes this change 
reflects EPA's desire that sources implement one prevention program 
that protects the safety and health of workers, the public and the 
environment and should have no effect on sources already complying with 
the OSHA PSM rule.
    Section 68.67, process hazard analysis, has been adopted from the 
OSHA rule with a few changes. The OSHA schedule for completion of PHAs 
has been replaced with the compliance date of this rule; a new sentence 
has been added to state that PHAs conducted to comply with OSHA PSM are 
acceptable as the initial PHA under this rule. These PHAs shall be 
updated and revalidated based on their OSHA completion date. This 
provision will ensure that sources do not need to duplicate PHAs 
already completed or change their update schedule.
    In paragraph (c)(2), the phrase ``in the workplace'' has been 
deleted from the requirement to identify previous incidents with the 
potential for catastrophic consequences because EPA does not have the 
authority to regulate the work place. EPA believes that this change 
will have no effect on the rule; any incident with the potential for 
catastrophic consequences in the workplace will also have had the 
potential for catastrophic consequences offsite. Similarly, the phrase 
``on employees in the workplace'' has been deleted from paragraph 
(c)(7), which requires a qualitative evaluation of a range of the 
possible safety and health effects of failure of controls. By deleting 
the language, rather than changing it, EPA is consistent with its 
authority without imposing any new requirements on sources. A new 
sentence has been added to paragraph (f) to state that PHAs updated and 
revalidated under the OSHA rule are acceptable for EPA's purposes. 
Throughout this section, internal references have been changed.
    To maintain consistency with OSHA PSM, proposed paragraph (j), 
which would have required the evaluation of mitigation and detection 
systems, has been dropped, as have proposed

[[Page 31712]]

references to offsite consequences and public health and the 
environment. Evaluation of mitigation and detection systems is normally 
part of the PHA process and of management's decisions on implementing 
recommendations and, therefore, EPA decided that a separate requirement 
was not needed. EPA will collect information on monitoring, detection, 
and mitigation systems used in each Program 2 and 3 process as part of 
the RMP. Proposed paragraph (a), which was advisory, has been dropped.
    Section 68.69, Operating Procedures, has been adopted verbatim from 
OSHA except for changing ``employer'' to ``owner or operator.'' 
Proposed paragraph (a) has been deleted to ensure consistency with 
OSHA.
    Section 68.71, Training, has been adopted verbatim from OSHA except 
for changing ``employer'' to ``owner or operator'' and changes in 
referenced sections. Proposed paragraph (a) has been deleted to ensure 
consistency with OSHA, as has proposed paragraph (e).
    Section 68.73, Mechanical Integrity proposed as Maintenance, has 
been adopted verbatim from OSHA except for changing ``employer'' to 
``owner or operator.'' Proposed paragraph (a) has been deleted to 
ensure consistency with OSHA. The proposed requirements to develop a 
critical equipment list, document training, and ``maintain'' as well as 
inspect and test under paragraph (d) have been dropped to ensure 
consistency with OSHA.
    Section 68.75, Management of Change, has been adopted verbatim from 
OSHA except for changing ``employer'' to ``owner or operator'' and 
changes to referenced sections. Proposed paragraph (a) has been deleted 
to ensure consistency with OSHA. EPA's proposed paragraph (b), which 
defined changes not covered by the section, has also been dropped in 
favor of OSHA's definition of ``replacement in kind.''
    Section 68.77, Pre-Startup Review, has been adopted verbatim from 
OSHA except for changing ``employer'' to ``owner or operator'' and 
changes to referenced sections. Proposed paragraph (a) and the 
reference to emergency response training in proposed paragraph (c)(4) 
have been deleted to ensure consistency with OSHA.
    Section 68.79, Compliance Audits, has been adopted verbatim from 
OSHA except for changing ``employer'' to ``owner or operator'' and 
changes to referenced sections. Proposed paragraph (a) has been deleted 
to ensure consistency with OSHA.
    Section 68.81, Accident Investigation, has been adopted verbatim 
from OSHA except for changing ``employer'' to ``owner or operator'' and 
``highly hazardous chemical'' to ``regulated substance'' and changes to 
referenced sections. Proposed paragraphs (a) and (b), the latter of 
which would have required written procedures, have been deleted to 
ensure consistency with OSHA. References to significant accidental 
release have been dropped because the phrase is no longer used. 
Although EPA has adopted OSHA's language, EPA has changed the 
definition of catastrophic release. Consequently, this section requires 
owners or operators to investigate accidents that resulted in or could 
reasonably have resulted in a release that presented serious danger to 
public health or the environment. EPA does not believe that, except in 
isolated cases, the modification to this provision will require sources 
to investigate accidents that they would not investigate under the OSHA 
rule.
    Section 68.83, Employee Participation, has been adopted verbatim 
from OSHA except for changing ``employer'' to ``owner or operator.'' 
Although EPA did not propose adopting this section, the Agency 
solicited comments on this issue, and commenters convinced the Agency 
that employee participation is an important component of a complete 
prevention program.
    Section 68.85, Hot Work Permit, has been adopted verbatim from OSHA 
except for changing ``employer'' to ``owner or operator.'' Although EPA 
did not propose adopting this section, the Agency solicited comments on 
this provision and decided that it was valuable to maintain consistency 
with the OSHA PSM elements and that the hot work permit was important 
to good prevention practices.
    Section 68.87, Contractors, has been adopted verbatim from OSHA 
except for changing ``employer'' to ``owner or operator,'' changing to 
referenced sections, and deleting OSHA's paragraph 29 CFR 
1910.119(h)(2)(vi). Although EPA did not propose adopting this section, 
the Agency solicited comments on this issue. Commenters argued that 
contractor practices are an important component of a complete 
prevention program. A number of major accidents have resulted from 
contractor mistakes. EPA agrees with the commenters and has included 
the provision in the final rule. EPA has, however, deleted the 
requirement that employers maintain an occupational injury and illness 
log for contract employees because the Agency does not have the 
authority to impose this requirement.
    EPA has placed the emergency response requirements in a new Subpart 
E and divided the proposed emergency response section into two separate 
sections, an applicability section and a section to cover the emergency 
response program.
    A new Sec. 68.90, Applicability, has been added. Because many 
sources covered by this rule may be too small to handle emergency 
response themselves, EPA has provided, in this new section, the actions 
they must take if they will not respond to releases. Specifically, for 
sources with regulated toxic substances, the source must be addressed 
in the community emergency response plan developed under EPCRA section 
303. Sources with regulated flammable substances must coordinate 
response actions with the local fire department. These sources must 
also establish a mechanism to contact local emergency responders. 
Sources that do not meet these requirements must comply with EPA's 
emergency response program requirements.
    Section 68.95, Emergency Response Program, is adopted from 
Sec. 68.45 of the proposed rule. The program has four components: an 
emergency response plan, procedures for use of response equipment and 
its maintenance, training for employees, and procedures to update the 
plan after changes to the source. The required elements of the plan are 
those specified in CAA section 112(r)(7)(B)(ii): procedures for 
informing the public and local response agencies; documentation of 
emergency medical treatment; and procedures and measures for emergency 
response. As explained above, EPA decided that, to avoid inconsistency 
with other emergency response planning regulations, the rule would be 
limited to the statutory requirements. Consequently, EPA has deleted 
the following proposed requirements: documentation of evacuation routes 
(which should be covered under the emergency action plans required by 
OSHA under 29 CFR 1910.38); descriptions of all response and mitigation 
technologies available at the source; documentation of the maintenance 
and training programs; emergency response drills and exercises; 
revision of the plan based on the findings of the drills and exercises; 
and documentation of management's response to findings and a schedule 
for completion. EPA believes that these requirements are addressed in 
other Federal regulations and, therefore, sources are already doing 
them. By not including them, EPA, however, avoids the possibility that 
slightly different wording could lead to unnecessary additional effort 
on the part of sources.

[[Page 31713]]

    EPA has added a paragraph (b) to this section to state that 
compliance with other Federal contingency plan regulations or use of 
the National Response Team's Integrated Contingency Plan Guidance 
(``One Plan'') that results in a written plan that addresses the 
elements in paragraph (a) shall satisfy the requirements of the rule, 
provided that the owner or operator also complies with paragraph (c) of 
this section.
    Paragraph (c) is adopted from proposed paragraph Sec. 68.45(g) and 
requires coordination of the plan with the local community emergency 
response plan. References to the local emergency planning committee 
(LEPC) have been changed to `local emergency response officials' to 
recognize and include other local groups that may be in charge of 
coordinating emergency planning. LEPCs would be included in this 
category.
    A new Subpart G has been created to cover the Risk Management Plan. 
The Risk Management Plan includes three main sections, an executive 
summary, the registration, and data elements that provide information 
on the offsite consequence analyses, the five-year accident history, 
the prevention program, and the emergency response program. The subpart 
includes separate section to address each of these, plus sections on 
submission, certifications, and updates.
    New Sec. 68.150, Submission, has been added. As discussed above, an 
owner or operator shall submit a single RMP for the source, regardless 
of the number of covered processes or the tiers for which they are 
eligible. All RMPs will be submitted in a manner and method EPA will 
specify by the compliance date to a point designated by EPA; no other 
submission will be required because other agencies and the public will 
have access to the submissions on-line. As required by the CAA, the 
first RMP must be submitted by June 21, 1999, three years after EPA 
first lists a substance, or the date on which a source first becomes 
subject to this part, whichever is latest. As discussed above under 
applicability, after June 21, 1999, sources that begin using a 
substance that has been listed for at least three years will be 
required to submit their RMPs on the date the substance is first on 
site above the threshold quantity. Sources that begin using such a 
regulated substance prior to June 21, 1999 will need to be in 
compliance with the rule on June 21, 1999. The final paragraph states 
that, except for a classified annex that would not be publicly 
available, the RMP shall exclude classified information.
    New Sec. 68.155 details the requirements for the executive summary. 
The summary shall include brief descriptions of the following items: 
the source's prevention and emergency response approach; the stationary 
source and regulated substances; worst-case release scenario(s) and 
alternative release scenario(s), including any administrative controls 
applied to limit the release quantity; the general prevention program 
and chemical-specific prevention steps; the five-year accident history; 
the emergency response program; and planned changes to improve safety. 
EPA anticipates that none of these items should require more than a 
half page of text. Because this information may be filed 
electronically, EPA is not asking sources to submit maps of the worst-
case or alternative release scenario circles. The data submitted under 
each of these sections will allow state or local agencies and the 
public to map the circles.
    Section 68.160, Registration, replaces proposed Sec. 68.12. The 
registration shall include the following data: stationary source name, 
street, city, county, state, zip code, latitude, and longitude; the 
stationary source and corporate Dun and Bradstreet numbers; the name, 
telephone number, and mailing address of the owner/operator; the name 
and title of the person responsible for implementation of the risk 
management program; the name, title, telephone number, and 24-hour 
telephone number of the emergency contact; the stationary source EPA 
identifier; the number of full-time employees at the stationary source; 
whether the stationary source is subject to 29 CFR 1910.119; whether 
the stationary source is subject to 40 CFR part 355; and the date on 
which the stationary source last had a safety inspection by a Federal, 
state, or local government agency.
    For each covered process, the source must list the regulated 
substances present above a threshold quantity (name and CAS number), 
the maximum quantity of each substance in the process, the SIC code of 
the process, and the Program level that applies to the process. This 
process information provides a simple method for describing covered 
processes and identifying Program levels.
    The reporting of the quantity has been changed; rather than have 
sources report in ranges, the rule requires that the quantity be 
reported to two significant digits. EPA has found that the reporting 
ranges are so broad (generally an order of magnitude) that data 
analysis is extremely difficult. By limiting the reporting to two 
significant digits, EPA will allow sources to estimate quantities, but 
still provide more precise data than are currently available. EPA has 
added a requirement for reporting full-time employees. These data are 
easy for sources to provide and will enhance the Agency's ability to 
assess the impact of its rule on businesses of various sizes. The EPA 
identifier will be the unique number EPA will assign to each source and 
will allow EPA to cross reference other reporting to the Agency. Use of 
the identifier also means that EPA may not need to collect certain data 
on this form because they will be available from the identifier 
database; EPA may revise the requirements when the identifier rule is 
promulgated.
    EPA has deleted the certification statement proposed for the 
registration because the RMP as a whole will have a certification 
statement that will cover all elements, including registration. 
Corrections to the registration will be treated as corrections to the 
RMP and must be filed within six months of the change, rather than the 
60 days proposed for registration changes.
    The registration now requires the owners or operators to check off 
the agency that last conducted a safety inspection at the source and 
provide the date. The inspection does not need to have been related to 
prevention practices as defined in this rule, but may instead cover 
fire safety, workplace safety, etc.
    New Sec. 68.165 covers the requirements for reporting on the 
offsite consequence analysis. As discussed in Section III.B, the RMP 
shall include data on one worst case release scenario for each Program 
1 process; and, for Program 2 and 3 processes, one worst case release 
scenario for toxics and one for flammables (for sources with substances 
in both hazard classes). If additional worst-case release scenarios are 
required under Sec. 68.25 for either class, data on that scenario must 
also be reported. Sources with Program 2 and 3 processes will also 
provide data on one alternative release scenario to cover all 
flammables in covered processes and an alternative release scenario for 
each toxic substance held in covered processes.
    For each reported scenario, the owners or operators shall provide 
the following data: chemical name; physical state (toxics only); basis 
of results and model (if used); scenario; quantity released in pounds; 
release rate; duration; wind speed and stability (toxics only); 
topography (toxics only); distance to endpoint; public and 
environmental receptors within the distance; passive mitigation 
considered; and active mitigation (alternative releases only) 
considered. A number of the data elements are not relevant to all

[[Page 31714]]

flammable releases; for example, in the worst-case release flammables 
are assumed to be released and explode almost instantly so that release 
rate, duration, wind speed and stability, and topography are not 
factors in determining distances.
    The purpose of requiring these data elements, rather than the 
proposed summary of the assessment, is to provide the public with the 
essential estimates of distance to the endpoints and provide enough 
data on the release scenario to allow agencies or the public to confirm 
the distance estimate. With the data provided, a public agency will be 
able to use EPA's guidance to determine the distance for a particular 
chemical release and compare that distance with the one reported by the 
source. This ability will be particularly important when a source has 
chosen to use an air dispersion model rather than the reference table. 
The proposed rule approach, which required a summary of the assessment, 
would have resulted in considerable variation in the information 
submitted, as happened in the Kanawha Valley exercise. In that case, 
each source decided on the level of information to provide; although 
each provided maps, it was not possible, in many cases, to determine 
how the distances were estimated because much of the underlying data 
was not reported. EPA believes that these requirements will impose a 
minimal burden on sources, because they will already have the data from 
completing the analyses, will ensure that the same data are reported by 
all sources, and will provide enough data to evaluate the results using 
publicly available documents and models.
    New Sec. 68.168 on the five-year accident history simply references 
the data elements listed in Sec. 68.42(a). The data elements will be 
reported for each accidental release covered by the accident history 
requirement.
    New Sec. 68.170, Prevention Program/Program 2, requires owners or 
operators with Program 2 processes to list the name of chemical(s) in, 
and SIC code for, the Program 2 process; to provide the dates of the 
most recent revisions or reviews of the prevention program elements; to 
provide, based on the hazard review, information on the major hazards, 
process controls, mitigation systems, monitoring or detection systems, 
and changes since the last hazard review; to list any state or federal 
regulations of industry-specific design codes or standards being used 
to demonstrate compliance with prevention program elements; to list the 
type of training and competency testing used; to provide the date of 
the most recent change that triggered a review or revision of 
prevention elements; and to provide the date of the completion of any 
changes resulting from hazard reviews, audits, or incident 
investigations. EPA recognizes that not all recommendations resulting 
from hazard reviews, audits, or incident investigations result in 
changes; some or all may be resolved without changes. However, if any 
changes are made, the owners or operators shall report in the RMP the 
date when such changes are complete or expected to be complete.
    New Sec. 68.175, Prevention Program/Program 3, requires owners or 
operators with Program 3 processes to list the name of chemical(s) in, 
and SIC code for, the Program 3 process; to provide the dates of the 
most recent revisions or reviews of the prevention program elements; to 
provide, based on the PHA, information on the major hazards, process 
controls, mitigation systems, monitoring or detection systems, and 
changes since the last PHA; to list the type of training and competency 
testing used; to provide the date of the most recent change that 
triggered a review or revision of prevention elements; and to provide 
the date of the completion of any changes resulting from PHAs, audits, 
or incident investigations. As above, EPA recognizes that not all 
recommendations resulting from PHAs, audits, or incident investigations 
result in changes; some or all may be resolved without changes. 
However, if any changes are made, the owners or operators shall report 
in the RMP the date when such changes are complete or expected to be 
complete.
    New Sec. 68.180, Emergency Response Program, requires owners or 
operators to answer questions about the required content of the 
emergency response plan, providing the date of the most recent training 
of employees update of the plan, indicate whether the source emergency 
response plan has been coordinated with the LEPC plan, provide the name 
and telephone number of the local agency with which the plan has been 
coordinated, and list other Federal or state emergency planning 
requirements to which the source is subject.
    New Sec. 68.185, Certification, specifies the certification 
requirements that owners or operators must complete when the RMP is 
submitted.
    New Sec. 68.190 details the requirements for updating the RMP. The 
plan must be updated at least once every five years. If a new substance 
is added to an already covered process or a new covered process is 
added, the RMP must be updated on the date on which the regulated 
substance is first present above a threshold quantity. If EPA lists a 
new substance that the source has above a threshold quantity, the RMP 
must be updated within three years of the date of listing. If a change 
at the source leads to a revised offsite consequence analysis, process 
hazard analysis or review, or a process changes Program level, the RMP 
must be revised and resubmitted within six months of the change. 
Subsequent updates will be required within five years of the update.
    A new Subpart H, Other Requirements, has been added.
    New Sec. 68.200, Recordkeeping, simply states that records will be 
maintained for five years unless otherwise specified in the Program 3 
prevention program.
    New Sec. 68.210, Availability of information to the public, has 
been added and a paragraph included to provide that classified 
information is protected under applicable laws, regulations, and 
executive orders.
    New Sec. 68.215, Permit content and air permitting authority or 
designated agency requirements, has been added to define the 
requirements for including part 68 in Part 70 and 71 permits, as 
discussed above.
    Section 68.220, Audits, has been revised to change references in 
paragraph (a). A new paragraph (c) has been added to specify the 
sources that have achieved a star or merit rating under OSHA's VPP 
program will be exempt from audits if the audit program is based on 
industry accident history or on neutral random oversight and if the 
source has not had an accidental release that requires investigation 
under the rule. Paragraph (h) has been revised to clarify that the 
source must revise the RMP 30 days after completion of the actions 
detailed in the implementation plan, not 30 days after the issuance of 
the final determination.
    Appendix A has been added to provide the toxic endpoints.

V. Required Analyses

A. E.O. 12866

    Under Executive Order (E.O.) 12866 (58 FR 51735; October 4, 1993), 
EPA must determine whether a regulatory action is ``significant'' and, 
therefore, subject to OMB review and the requirements of the E.O. The 
Order defines ``significant regulatory action'' as one that is likely 
to result in a rule that may:
    (1) Have an annual effect on the economy of $100 million or more or 
adversely affect in a material way the economy, a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety, or state, local, or tribal government or communities.

[[Page 31715]]

    (2) Create a serious inconsistency or otherwise interfere with an 
action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, grants, 
user fees, or loan programs or the rights and obligations of recipients 
thereof; or
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the E.O.
    Under terms of E.O. 12866, EPA has determined that today's final 
rulemaking is a ``significant regulatory action.'' EPA, therefore, has 
developed an economic impact analysis for the final rule, (Economic 
Analysis in Support of Final Rule on Risk Management Program 
Regulations for Chemical Accidental Release Prevention), which is 
available in the docket.
    In developing the final rule, EPA notes that it has taken actions 
to streamline requirements whenever possible and has tailored the 
requirements through the use of Programs. This approach differed from 
the proposed rule, which imposed what are now Program 3 requirements on 
all sources and processes. EPA has also changed substantially the 
requirements for two elements of the rule, the offsite consequence 
analysis and the RMP. For the offsite consequence analysis, EPA decided 
to develop methodologies and look-up tables so sources would not need 
to spend resources obtaining air dispersion models; EPA also reduced 
the requirements to define offsite populations by allowing sources to 
use Census data and to identify only those institutions and 
developments that appear on local maps (as opposed to identifying day 
care centers and nursing homes). For the RMP, EPA has limited the 
requirements for information to that which can be reported as data 
elements. In contrast, the rule as proposed would have required sources 
to document for each process all major hazards, the consequences of 
each of these hazards, the risk reduction steps taken to address each 
hazard, and the consequences of each risk reduction step. The result 
would have been, for large, complex sources, documents of a 1,000 pages 
or more.
    To analyze the cost impacts of the various approaches, EPA 
considered three possible options in the final EIA: the final rule, an 
option that imposed final rule Program 3 requirements on all sources, 
and an option that imposed proposed rule requirements on all sources. 
The last of these options was considered to evaluate the impact of 
changing the requirements for the offsite consequence analysis and RMP.
    Based on the final list and thresholds, EPA estimates that 
approximately 66,100 sources will be affected by the rule. EPA expects 
that about 360 sources and approximately 410 processes will be eligible 
for Program 1. These sources are primarily gas processors that, because 
they are remote and unstaffed, are not covered by OSHA PSM. EPA also 
estimated that approximately 50 processes using toluene di-isocyanate 
(TDI) may qualify for Program 1 based on the relatively low volatility 
of TDI. Program 2 is expected to include 40,200 sources and 47,700 
processes; these sources include all retailers, propane users, public 
drinking water and wastewater systems and public electric utilities not 
subject to OSHA PSM, wholesalers, processes at Federal facility 
processes, and non-chemical manufacturers. Program 3 is expected to 
cover 25,500 sources and 43,800 processes. These sources include 
manufacturers, electric utilities, POTWs and drinking water sites 
covered by OSHA PSM, wholesalers, ammonia refrigeration systems, gas 
utilities, gas processors, and Federal facilities. All of these sources 
are already covered by OSHA PSM for at least one regulated substance; 
EPA estimates that about 370 non-OSHA Program 3 processes in the 
specified SIC codes will be covered.
    Sources that already have a high quality PSM program would not need 
to take any additional actions to satisfy EPA's Program 3 prevention 
program, but the analysis assumed that many sources may still be in the 
process of improving their PSM programs after achieving initial 
compliance. The public scrutiny expected to follow submission of the 
RMP is likely to encourage sources to ensure that their prevention 
efforts are fully implemented and effective. To account for these 
efforts, the analysis assumed that sources covered by OSHA would 
improve training, maintenance, and management oversight and, in some 
cases, institute additional capital improvements.
    The rule provides sources three years to come into compliance with 
the rule. The rule, however, will impose continuing costs as sources 
implement their risk management programs. Initial compliance, 
therefore, covers the cost of meeting the requirements of the rule by 
the three-year compliance date. These costs are presented as a single 
figure, but are assumed to be incurred over a three-year period. Total 
costs to industry were estimated by multiplying the estimated unit 
costs of compliance with the risk management program elements by the 
estimated number of affected sources. Because many sources already 
implement some of the risk management requirements (e.g., training), 
cost estimates were adjusted to account for the expected likelihood 
that a source is already human health (death or injury), responses to 
these threats (evacuations, sheltering in place) threats to the 
environment, and economic damages (lost production, property damages, 
and litigation). Additional benefits may be provided by making 
information available to the public in the RMP. These benefits, 
however, cannot be quantified.

B. Regulatory Flexibility Act

    In accordance with the Regulatory Flexibility Act of 1980, Federal 
agencies must evaluate the impacts of rules on small entities and 
consider less burdensome regulatory alternatives. As originally 
proposed in 1993, EPA believes that the rule would have created a 
severe, adverse impact on small manufacturers. In February 1995, EPA 
published a supplemenatal proposal which introduced a tiering approach 
for this regulation. By using the tiering approach and streamlining the 
Program 2 requirements, this final rule significantly reduces the 
impact on small businesses. The tiering approach also significantly 
reduces the impact on small communities.
    EPA has developed a Regulatory Flexibility Analysis for this final 
rule evaluating the effects on small entities, which is presented in 
Chapter 7 of the EIA. The number of small manufacturers was estimated 
to be 960 sources with fewer than 20 FTEs, and 2,000 sources with 
between 20 and 99 FTEs. The number of small non-manufacturers is more 
difficult to determine. Virtually all retailer and wholesalers have 
fewer than 100 FTEs. Industry estimates, however, indicate that about 
80 percent of the affected retailers may be owned by larger companies; 
the analysis assumed that 3,700 retailers were small businesses. No 
information was available to estimate the percentage of wholesalers 
that might be owned by large corporations. The analysis assumed that 
all wholesalers were small. The total number of small businesses, 
therefore, was estimated to be 8,160.
    Public drinking water and waste water systems affected by the rule 
generally serve a minimum of 10,000 people. Approximately 980 water 
systems are estimated to serve between 10,000 and 25,000 people. 
Approximately 500 water systems are estimated to serve between 25,000 
and 50,000 people. Consequently, 1,480 drinking water systems would be 
considered small governmental entities. The number of small POTWs was

[[Page 31716]]

estimated to include all systems treating less than 10 mgd and 59 
percent of those treating between 10 and 25 mgd (based on the ratio of 
drinking water systems in this category that serve populations below 
50,000). Approximately 2,600 POTWs were estimated to serve between 
10,000 and 25,000 people and 180 to serve between 25,000 and 50,000, 
for a total of 2,800 POTWs. A total of approximately 4,300 small 
governmental entities would be affected by this rule.
    The total number of small entities affected by this rule was 
estimated to be 12,500 or 19 percent of the affected universe. No 
detailed analysis of the impact on small entities was performed because 
of the relatively low cost of the rule for small entities. Initial 
costs are considerably less than one percent of sales for all small 
manufacturers. Subsequent year costs will be even lower. Costs for non-
manufacturers are very low (less than $1,000 per year for initial 
compliance). These sums do not impose a serious adverse burden on these 
sources. Only chemical manufacturers with complex processes and 20 to 
99 FTEs have initial costs that exceed $6,000 per year. The costs for 
these sources, $28,000 to $30,000 per year for the first three years, 
represent less than 0.5 percent of sales. It should be noted that all 
of the costs for small manufacturers assume that the sources will take 
additional efforts, above their actions to comply with the OSHA rule, 
to improve the quality of the risk management programs. If they do not 
take additional actions, their costs would be substantially lower.

C. Unfunded Mandates Reform Act

    Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public 
Law 104-4, establishes requirements for Federal agencies to assess the 
effects of their regulatory actions on state, local, and tribal 
governments and the private sector. Under section 202 of UMRA, EPA must 
generally prepare a written statement, including a cost-benefit 
analysis for proposed and final rules with ``Federal mandates'' that 
may result in expenditures to state, local, and tribal governments, in 
the aggregate, or to the private sector, of $100 million or more in any 
one year. Before promulgating an EPA rule for which a written statement 
is needed, section 205 of UMRA generally requires EPA to identify and 
consider a reasonable number of regulatory alternatives and adopt the 
least costly, most cost-effective, or least burdensome alternatives 
that achieves the objectives of the rule. The provisions of section 205 
do not apply when they are inconsistent with applicable law. Moreover, 
section 205 allows EPA to adopt an alternative other than the least 
costly, most cost-effective, or least burdensome alternative if the 
Administrator publishes with the final rule an explanation of why the 
alternative was not adopted. Before EPA establishes any regulatory 
requirements that significantly or uniquely affect small governments, 
including tribal governments, it must have developed under section 203 
of UMRA, a small government agency plan. The plan must provide for 
notifying potentially affected small governments, enabling officials of 
affected small governments to have meaningful and timely input into the 
development of the regulatory proposals with significant Federal 
intergovernmental mandates, and informing, educating, and advising 
small governments on compliance with the regulatory requirements.
    EPA has determined that this rule contains a Federal mandate that 
may result in expenditures of $100 million or more for state, local, 
and tribal governments, in the aggregate, or to the private sector, in 
any one year. Accordingly, EPA has prepared, under section 202 of the 
UMRA, a written statement which is summarized below.
    EPA is required to promulgate this rule under CAA section 112(r). 
In the first and third year of initial compliance, the cost of the rule 
to the regulated community will exceed $100 million; in all subsequent 
years the costs will be below $100 million. EPA has developed an 
economic impact analysis, discussed above, that evaluates several 
regulatory alternatives. EPA has adopted the least costly of these 
alternatives. EPA estimates that annualized costs for state and local 
governments will be $13 million; annualized costs for the private 
sector are estimated to be $72 million.
    Consistent with the intergovernmental consultation provisions of 
section 204 of the UMRA and Executive Order 12875 ``Enhancing the 
Intergovernmental Partnership,'' EPA has involved state, local and 
business representatives in focus groups to develop the rule. EPA 
included representatives of state government in the rulemaking 
workgroup process, available to the public under CAA section 114(c) and 
40 CFR part 2; EPA does not believe that any of the requested 
information will be considered confidential.
    The public reporting burden will depend on the regulatory program 
into which the 66,100 sources are placed. The public reporting burden 
for rule familiarization is estimated to range from 4 to 68 hours per 
source for all three program tiers. The public reporting burden to 
prepare and submit the registration and other RMP elements is estimated 
to be 0.5 hours for sources with only Program 1 processes, between 6.0 
and 11.25 hours for Program 2 sources, and between 6.25 and 30.5 hours 
for Program 3 sources. The RMP is submitted once, at the end of the 
three year compliance period. The public recordkeeping burden to 
maintain on-site documentation is estimated to range from 10 to 180 
hours for Program 2 sources and from 52 to 1,200 hours for Program 3 
sources. On-site documentation must be developed and maintained on an 
ongoing basis, which varies by rule element; based on the statute of 
limitation for this rule, documentation must generally be maintained 
for five years. The total annual public reporting burden for rule 
familiarization, to complete the RMP, and to maintain on-site 
documentation is estimated to be about 3.36 million hours over three 
years, or an annual burden of 1.119 million hours. No capital costs are 
expected to be incurred to maintain or submit this documentation.
    Burden means the total time, effort, or financial resources 
expended by persons to generate, maintain, retain, or disclose or 
provide information to or for a Federal agency. This includes the time 
needed to review instructions; develop, acquire, install, and use 
technology and systems for the purposes of collecting, validating, and 
verifying information, processing and maintaining information, and 
disclosing and providing information; adjust the existing ways to 
comply with any previously applicable instructions and requirements; 
train personnel to be able to respond to a collection of information; 
search data sources; complete and review the collection of information; 
and transmit or otherwise disclose the information.

E. Submission to Congress and the General Accounting Office

    Under section 801(a)(1)(A) of the Administrative Procedures Act 
(APA) as amended by the Small Business Regulatory Enforcement Fairness 
Act of 1996, EPA submitted a report containing this rule and other 
required information to the U.S. Senate, the U.S. House of 
Representatives and the Comptroller General of the General Accounting 
Office prior to publication of the rule in today's Federal Register. 
This rule is a ``major rule'' as defined by section 804(2) of the APA 
as amended.

[[Page 31717]]

List of Subjects in 40 CFR Part 68

    Environmental protection, Chemicals, Hazardous substances, 
Intergovernmental relations.

    Dated: May 24, 1996.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, 40 CFR Part 68 is amended 
as follows:

PART 68--[AMENDED]

    1. The authority citation for part 68 is revised to read as 
follows:

    Authority: 42 U.S.C. 7412(r), 7601(a)(1), 7661-7661f.

    2. Part 68 is amended by redesignating Subpart C (Secs. 68.100--
68.130) as Subpart F.

Subpart A--[Amended]

    4. Section 68.3 is amended to add the following definitions:

Sec. 68.3  Definitions.

    Act means the Clean Air Act as amended (42 U.S.C. 7401 et seq.)
* * * * *
    Administrative controls mean written procedural mechanisms used for 
hazard control.
    AIChE/CCPS means the American Institute of Chemical Engineers/
Center for Chemical Process Safety.
* * * * *
    API means the American Petroleum Institute.
    ASME means the American Society of Mechanical Engineers.
    Catastrophic release means a major uncontrolled emission, fire, or 
explosion, involving one or more regulated substances that presents 
imminent and substantial endangerment to public health and the 
environment.
    Classified information means ``classified information'' as defined 
in the Classified Information Procedures Act, 18 U.S.C. App. 3, section 
1(a) as ``any information or material that has been determined by the 
United States Government pursuant to an executive order, statute, or 
regulation, to require protection against unauthorized disclosure for 
reasons of national security.''
    Covered process means a process that has a regulated substance 
present in more than a threshold quantity as determined under 
Sec. 68.115.
    Designated agency means the state, local, or Federal agency 
designated by the state under the provisions of Sec. 68.215(d) .
* * * * *
    Environmental receptor means natural areas such as national or 
state parks, forests, or monuments; officially designated wildlife 
sanctuaries, preserves, refuges, or areas; and Federal wilderness 
areas, that could be exposed at any time to toxic concentrations, 
radiant heat, or overpressure greater than or equal to the endpoints 
provided in Sec. 68.22(a) , as a result of an accidental release and 
that can be identified on local U. S. Geological Survey maps.
    Hot work means work involving electric or gas welding, cutting, 
brazing, or similar flame or spark-producing operations.
    Implementing agency means the state or local agency that obtains 
delegation for an accidental release prevention program under subpart 
E, 40 CFR part 63. The implementing agency may, but is not required to, 
be the state or local air permitting agency. If no state or local 
agency is granted delegation, EPA will be the implementing agency for 
that state.
    Injury means any effect on a human that results either from direct 
exposure to toxic concentrations; radiant heat; or overpressures from 
accidental releases or from the direct consequences of a vapor cloud 
explosion (such as flying glass, debris, and other projectiles) from an 
accidental release and that requires medical treatment or 
hospitalization.
    Major change means introduction of a new process, process 
equipment, or regulated substance, an alteration of process chemistry 
that results in any change to safe operating limits, or other 
alteration that introduces a new hazard.
    Mechanical integrity means the process of ensuring that process 
equipment is fabricated from the proper materials of construction and 
is properly 
FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
installed, maintained, and replaced to prevent failures and 
accidental releases.
    Medical treatment means treatment, other than first aid, 
administered by a physician or registered professional personnel under 
standing orders from a physician.
    Mitigation or mitigation system means specific activities, 
technologies, or equipment designed or deployed to capture or control 
substances upon loss of containment to minimize exposure of the public 
or the environment. Passive mitigation means equipment, devices, or 
technologies that function without human, mechanical, or other energy 
input. Active mitigation means equipment, devices, or technologies that 
need human, mechanical, or other energy input to function.
    NFPA means the National Fire Protection Association.
    Offsite means areas beyond the property boundary of the stationary 
source, and areas within the property boundary to which the public has 
routine and unrestricted access during or outside business hours.
    OSHA means the U.S. Occupational Safety and Health Administration. 
Owner or operator means any person who owns, leases, operates, 
controls, or supervises a stationary source.
    Population means the public.
* * * * *
    Public means any person except employees or contractors at the 
stationary source.
    Public receptor means offsite residences, institutions (e.g., 
schools, hospitals), industrial, commercial, and office buildings, 
parks, or recreational areas inhabited or occupied by the public at any 
time without restriction by the stationary source where members of the 
public could be exposed to toxic concentrations, radiant heat, or 
overpressure, as a result of an accidental release.
* * * * *
    Replacement in kind means a replacement that satisfies the design 
specifications.
    RMP means the risk management plan required under subpart G of this 
part.
    SIC means Standard Industrial Classification.
* * * * *
    Typical meteorological conditions means the temperature, wind 
speed, cloud cover, and atmospheric stability class, prevailing at the 
site based on data gathered at or near the site or from a local 
meteorological station.
* * * * *
    Worst-case release means the release of the largest quantity of a 
regulated substance from a vessel or process line failure that results 
in the greatest distance to an endpoint defined in Sec. 68.22(a).
    5. Section 68.10 is added to subpart A to read as follows:

Sec. 68.10  Applicability.

    (a) An owner or operator of a stationary source that has more than 
a threshold quantity of a regulated substance in a process, as 
determined under Sec. 68.115, shall comply with the requirements of 
this part no later than the latest of the following dates:
    (1) June 21, 1999;
    (2) Three years after the date on which a regulated substance is 
first listed under Sec. 68.130; or
    (3) The date on which a regulated substance is first present above 
a threshold quantity in a process.
    (b) Program 1 eligibility requirements. A covered process is 
eligible for

[[Page 31718]]

Program 1 requirements as provided in Sec. 68.12(b) if it meets all of 
the following requirements:
    (1) For the five years prior to the submission of an RMP, the 
process has not had an accidental release of a regulated substance 
where exposure to the substance, its reaction products, overpressure 
generated by an explosion involving the substance, or radiant heat 
generated by a fire involving the substance led to any of the following 
offsite:
    (i) Death;
    (ii) Injury; or
    (iii) Response or restoration activities for an exposure of an 
environmental receptor;
    (2) The distance to a toxic or flammable endpoint for a worst-case 
release assessment conducted under Subpart B and Sec. 68.25 is less 
than the distance to any public receptor, as defined in Sec. 68.30; and
    (3) Emergency response procedures have been coordinated between the 
stationary source and local emergency planning and response 
organizations.
    (c) Program 2 eligibility requirements. A covered process is 
subject to Program 2 requirements if it does not meet the eligibility 
requirements of either paragraph (b) or paragraph (d) of this section.
    (d) Program 3 eligibility requirements. A covered process is 
subject to Program 3 if the process does not meet the requirements of 
paragraph (b) of this section, and if either of the following 
conditions is met:
    (1) The process is in SIC code 2611, 2812, 2819, 2821, 2865, 2869, 
2873, 2879, or 2911; or
    (2) The process is subject to the OSHA process safety management 
standard, 29 CFR 1910.119.
    (e) If at any time a covered process no longer meets the 
eligibility criteria of its Program level, the owner or operator shall 
comply with the requirements of the new Program level that applies to 
the process and update the RMP as provided in Sec. 68.190.
    6. Section 68.12 is added to subpart A to read as follows:

Sec. 68.12  General requirements.

    (a) General requirements. The owner or operator of a stationary 
source subject to this part shall submit a single RMP, as provided in 
Secs. 68.150 to 68.185. The RMP shall include a registration that 
reflects all covered processes.
    (b) Program 1 requirements. In addition to meeting the requirements 
of paragraph (a) of this section, the owner or operator of a stationary 
source with a process eligible for Program 1, as provided in 
Sec. 68.10(b), shall:
    (1) Analyze the worst-case release scenario for the process(es), as 
provided in Sec. 68.25; document that the nearest public receptor is 
beyond the distance to a toxic or flammable endpoint defined in 
Sec. 68.22(a); and submit in the RMP the worst-case release scenario as 
provided in Sec. 68.165;
    (2) Complete the five-year accident history for the process as 
provided in Sec. 68.42 of this part and submit it in the RMP as 
provided in Sec. 68.168;
    (3) Ensure that response actions have been coordinated with local 
emergency planning and response agencies; and
    (4) Certify in the RMP the following: ``Based on the criteria in 40 
CFR 68.10, the distance to the specified endpoint for the worst-case 
accidental release scenario for the following process(es) is less than 
the distance to the nearest public receptor: [list process(es)]. Within 
the past five years, the process(es) has (have) had no accidental 
release that caused offsite impacts provided in the risk management 
program rule (40 CFR 68.10(b)(1)). No additional measures are necessary 
to prevent offsite impacts from accidental releases. In the event of 
fire, explosion, or a release of a regulated substance from the 
process(es), entry within the distance to the specified endpoints may 
pose a danger to public emergency responders. Therefore, public 
emergency responders should not enter this area except as arranged with 
the emergency contact indicated in the RMP. The undersigned certifies 
that, to the best of my knowledge, information, and belief, formed 
after reasonable inquiry, the information submitted is true, accurate, 
and complete. [Signature, title, date signed].''
    (c) Program 2 requirements. In addition to meeting the requirements 
of paragraph (a) of this section, the owner or operator of a stationary 
source with a process subject to Program 2, as provided in 
Sec. 68.10(c), shall:
    (1) Develop and implement a management system as provided in 
Sec. 68.15;
    (2) Conduct a hazard assessment as provided in Secs. 68.20 through 
68.42;
    (3) Implement the Program 2 prevention steps provided in 
Secs. 68.48 through 68.60 or implement the Program 3 prevention steps 
provided in Secs. 68.65 through 68.87;
    (4) Develop and implement an emergency response program as provided 
in Secs. 68.90 to 68.95; and
    (5) Submit as part of the RMP the data on prevention program 
elements for Program 2 processes as provided in Sec. 68.170.
    (d) Program 3 requirements. In addition to meeting the requirements 
of paragraph (a) of this section, the owner or operator of a stationary 
source with a process subject to Program 3, as provided in 
Sec. 68.10(d) shall:
    (1) Develop and implement a management system as provided in 
Sec. 68.15;
    (2) Conduct a hazard assessment as provided in Secs. 68.20 through 
68.42;
    (3) Implement the prevention requirements of Secs. 68.65 through 
68.87;
    (4) Develop and implement an emergency response program as provided 
in Secs. 68.90 to 68.95 of this part; and
    (5) Submit as part of the RMP the data on prevention program 
elements for Program 3 processes as provided in Sec. 68.175.
    7. Section 68.15 is added to subpart A to read as follows:

Sec. 68.15  Management.

    (a) The owner or operator of a stationary source with processes 
subject to Program 2 or Program 3 shall develop a management system to 
oversee the implementation of the risk management program elements.
    (b) The owner or operator shall assign a qualified person or 
position that has the overall responsibility for the development, 
implementation, and integration of the risk management program 
elements.
    (c) When responsibility for implementing individual requirements of 
this part is assigned to persons other than the person identified under 
paragraph (b) of this section, the names or positions of these people 
shall be documented and the lines of authority defined through an 
organization chart or similar document.
    8. Subpart B--is added to read as follows:

Subpart B--Hazard Assessment

Sec.
68.20  Applicability.
68.22  Offsite consequence analysis parameters.
68.25  Worst-case release scenario analysis.
68.28  Alternative release scenario analysis.
68.30  Defining offsite impacts  population.
68.33  Defining offsite impacts  environment.
68.36  Review and update.
68.39  Documentation.
68.42  Five-year accident history.

Subpart B--Hazard Assessment

Sec. 68.20  Applicability.

    The owner or operator of a stationary source subject to this part 
shall prepare a worst-case release scenario analysis as provided in 
Sec. 68.25 of this part and complete the five-year accident history as 
provided in Sec. 68.42. The owner or

[[Page 31719]]

operator of a Program 2 and 3 process must comply with all sections in 
this subpart for these processes.

Sec. 68.22  Offsite consequence analysis parameters.

    (a) Endpoints. For analyses of offsite consequences, the following 
endpoints shall be used:
    (1) Toxics. The toxic endpoints provided in Appendix A of this 
part.
    (2) Flammables. The endpoints for flammables vary according to the 
scenarios studied:
    (i) Explosion. An overpressure of 1 psi.
    (ii) Radiant heat/exposure time. A radiant heat of 5 kw/m2 for 
40 seconds.
    (iii) Lower flammability limit. A lower flammability limit as 
provided in NFPA documents or other generally recognized sources.
    (b) Wind speed/atmospheric stability class. For the worst-case 
release analysis, the owner or operator shall use a wind speed of 1.5 
meters per second and F atmospheric stability class. If the owner or 
operator can demonstrate that local meteorological data applicable to 
the stationary source show a higher minimum wind speed or less stable 
atmosphere at all times during the previous three years, these minimums 
may be used. For analysis of alternative scenarios, the owner or 
operator may use the typical meteorological conditions for the 
stationary source.
    (c) Ambient temperature/humidity. For worst-case release analysis 
of a regulated toxic substance, the owner or operator shall use the 
highest daily maximum temperature in the previous three years and 
average humidity for the site, based on temperature/humidity data 
gathered at the stationary source or at a local meteorological station; 
an owner or operator using the RMP Offsite Consequence Analysis 
Guidance may use 25 deg.C and 50 percent humidity as values for these 
variables. For analysis of alternative scenarios, the owner or operator 
may use typical temperature/humidity data gathered at the stationary 
source or at a local meteorological station.
    (d) Height of release. The worst-case release of a regulated toxic 
substance shall be analyzed assuming a ground level (0 feet) release. 
For an alternative scenario analysis of a regulated toxic substance, 
release height may be determined by the release scenario.
    (e) Surface roughness. The owner or operator shall use either urban 
or rural topography, as appropriate. Urban means that there are many 
obstacles in the immediate area; obstacles include buildings or trees. 
Rural means there are no buildings in the immediate area and the 
terrain is generally flat and unobstructed.
    (f) Dense or neutrally buoyant gases. The owner or operator shall 
ensure that tables or models used for dispersion analysis of regulated 
toxic substances appropriately account for gas density.
    (g) Temperature of released substance. For worst case, liquids 
other than gases liquified by refrigeration only shall be considered to 
be released at the highest daily maximum temperature, based on data for 
the previous three years appropriate for the stationary source, or at 
process temperature, whichever is higher. For alternative scenarios, 
substances may be considered to be released at a process or ambient 
temperature that is appropriate for the scenario.

Sec. 68.25  Worst-case release scenario analysis.

    (a) The owner or operator shall analyze and report in the RMP:
    (1) For Program 1 processes, one worst-case release scenario for 
each Program 1 process;
    (2) For Program 2 and 3 processes:
    (i) One worst-case release scenario that is estimated to create the 
greatest distance in any direction to an endpoint provided in Appendix 
A of this part resulting from an accidental release of regulated toxic 
substances from covered processes under worst-case conditions defined 
in Sec. 68.22;
    (ii) One worst-case release scenario that is estimated to create 
the greatest distance in any direction to an endpoint defined in 
Sec. 68.22(a) resulting from an accidental release of regulated 
flammable substances from covered processes under worst-case conditions 
defined in Sec. 68.22; and
    (iii) Additional worst-case release scenarios for a hazard class if 
a worst-case release from another covered process at the stationary 
source potentially affects public receptors different from those 
potentially affected by the worst-case release scenario developed under 
paragraphs (a)(2)(i) or (a)(2)(ii) of this section.
    (b) Determination of worst-case release quantity. The worst-case 
release quantity shall be the greater of the following:
    (1) For substances in a vessel, the greatest amount held in a 
single vessel, taking into account administrative controls that limit 
the maximum quantity; or
    (2) For substances in pipes, the greatest amount in a pipe, taking 
into account administrative controls that limit the maximum quantity.
    (c) Worst-case release scenario--toxic gases.
    (1) For regulated toxic substances that are normally gases at 
ambient temperature and handled as a gas or as a liquid under pressure, 
the owner or operator shall assume that the quantity in the vessel or 
pipe, as determined under paragraph (b) of this section, is released as 
a gas over 10 minutes. The release rate shall be assumed to be the 
total quantity divided by 10 unless passive mitigation systems are in 
place.
    (2) For gases handled as refrigerated liquids at ambient pressure:
    (i) If the released substance is not contained by passive 
mitigation systems or if the contained pool would have a depth of 1 cm 
or less, the owner or operator shall assume that the substance is 
released as a gas in 10 minutes;
    (ii) If the released substance is contained by passive mitigation 
systems in a pool with a depth greater than 1 cm, the owner or operator 
may assume that the quantity in the vessel or pipe, as determined under 
paragraph (b) of this section, is spilled instantaneously to form a 
liquid pool. The volatilization rate (release rate) shall be calculated 
at the boiling point of the substance and at the conditions specified 
in paragraph (d) of this section.
    (d) Worst-case release scenario--toxic liquids.
    (1) For regulated toxic substances that are normally liquids at 
ambient temperature, the owner or operator shall assume that the 
quantity in the vessel or pipe, as determined under paragraph (b) of 
this section, is spilled instantaneously to form a liquid pool.
    (i) The surface area of the pool shall be determined by assuming 
that the liquid spreads to 1 centimeter deep unless passive mitigation 
systems are in place that serve to contain the spill and limit the 
surface area. Where passive mitigation is in place, the surface area of 
the contained liquid shall be used to calculate the volatilization 
rate.
    (ii) If the release would occur onto a surface that is not paved or 
smooth, the owner or operator may take into account the actual surface 
characteristics.
    (2) The volatilization rate shall account for the highest daily 
maximum temperature occurring in the past three years, the temperature 
of the substance in the vessel, and the concentration of the substance 
if the liquid spilled is a mixture or solution.
    (3) The rate of release to air shall be determined from the 
volatilization rate of the liquid pool. The owner or operator may use 
the methodology in the RMP Offsite Consequence Analysis Guidance or any 
other publicly available techniques that account for the modeling 
conditions and are recognized by industry as applicable as part of

[[Page 31720]]

current practices. Proprietary models that account for the modeling 
conditions may be used provided the owner or operator allows the 
implementing agency access to the model and describes model features 
and differences from publicly available models to local emergency 
planners upon request.
    (e) Worst-case release scenario--flammables. The owner or operator 
shall assume that the quantity of the substance, as determined under 
paragraph (b) of this section, vaporizes resulting in a vapor cloud 
explosion. A yield factor of 10 percent of the available energy 
released in the explosion shall be used to determine the distance to 
the explosion endpoint if the model used is based on TNT-equivalent 
methods.
    (f) Parameters to be applied. The owner or operator shall use the 
parameters defined in Sec. 68.22 to determine distance to the 
endpoints. The owner or operator may use the methodology provided in 
the RMP Offsite Consequence Analysis Guidance or any commercially or 
publicly available air dispersion modeling techniques, provided the 
techniques account for the modeling conditions and are recognized by 
industry as applicable as part of current practices. Proprietary models 
that account for the modeling conditions may be used provided the owner 
or operator allows the implementing agency access to the model and 
describes model features and differences from publicly available models 
to local emergency planners upon request.
    (g) Consideration of passive mitigation. Passive mitigation systems 
may be considered for the analysis of worst case provided that the 
mitigation system is capable of withstanding the release event 
triggering the scenario and would still function as intended.
    (h) Factors in selecting a worst-case scenario. Notwithstanding the 
provisions of paragraph (b) of this section, the owner or operator 
shall select as the worst case for flammable regulated substances or 
the worst case for regulated toxic substances, a scenario based on the 
following factors if such a scenario would result in a greater distance 
to an endpoint defined in Sec. 68.22(a) beyond the stationary source 
boundary than the scenario provided under paragraph (b) of this 
section:
    (1) Smaller quantities handled at higher process temperature or 
pressure; and
    (2) Proximity to the boundary of the stationary source.

Sec. 68.28  Alternative release scenario analysis.

    (a) The number of scenarios. The owner or operator shall identify 
and analyze at least one alternative release scenario for each 
regulated toxic substance held in a covered process(es) and at least 
one alternative release scenario to represent all flammable substances 
held in covered processes.
    (b) Scenarios to consider. (1) For each scenario required under 
paragraph (a) of this section, the owner or operator shall select a 
scenario:
    (i) That is more likely to occur than the worst-case release 
scenario under Sec. 68.25; and
    (ii) That will reach an endpoint offsite, unless no such scenario 
exists.
    (2) Release scenarios considered should include, but are not 
limited to, the following, where applicable:
    (i) Transfer hose releases due to splits or sudden hose uncoupling;
    (ii) Process piping releases from failures at flanges, joints, 
welds, valves and valve seals, and drains or bleeds;
    (iii) Process vessel or pump releases due to cracks, seal failure, 
or drain, bleed, or plug failure;
    (iv) Vessel overfilling and spill, or overpressurization and 
venting through relief valves or rupture disks; and
    (v) Shipping container mishandling and breakage or puncturing 
leading to a spill.
    (c) Parameters to be applied. The owner or operator shall use the 
appropriate parameters defined in Sec. 68.22 to determine distance to 
the endpoints. The owner or operator may use either the methodology 
provided in the RMP Offsite Consequence Analysis Guidance or any 
commercially or publicly available air dispersion modeling techniques, 
provided the techniques account for the specified modeling conditions 
and are recognized by industry as applicable as part of current 
practices. Proprietary models that account for the modeling conditions 
may be used provided the owner or operator allows the implementing 
agency access to the model and describes model features and differences 
from publicly available models to local emergency planners upon 
request.
    (d) Consideration of mitigation. Active and passive mitigation 
systems may be considered provided they are capable of withstanding the 
event that triggered the release and would still be functional.
    (e) Factors in selecting scenarios. The owner or operator shall 
consider the following in selecting alternative release scenarios:
    (1) The five-year accident history provided in Sec. 68.42; and
    (2) Failure scenarios identified under Secs. 68.50 or 68.67.

Sec. 68.30  Defining offsite impacts--population.

    (a) The owner or operator shall estimate in the RMP the population 
within a circle with its center at the point of the release and a 
radius determined by the distance to the endpoint defined in 
Sec. 68.22(a).
    (b) Population to be defined. Population shall include residential 
population. The presence of institutions (schools, hospitals, prisons), 
parks and recreational areas, and major commercial, office, and 
industrial buildings shall be noted in the RMP.
    (c) Data sources acceptable. The owner or operator may use the most 
recent Census data, or other updated information, to estimate the 
population potentially affected.
    (d) Level of accuracy. Population shall be estimated to two 
significant digits.

Sec. 68.33  Defining offsite impacts--environment.

    (a) The owner or operator shall list in the RMP environmental 
receptors within a circle with its center at the point of the release 
and a radius determined by the distance to the endpoint defined in 
Sec. 68.22(a) of this part.
    (b) Data sources acceptable. The owner or operator may rely on 
information provided on local U.S. Geological Survey maps or on any 
data source containing U.S.G.S. data to identify environmental 
receptors.

68.36  Review and update.

    (a) The owner or operator shall review and update the offsite 
consequence analyses at least once every five years.
    (b) If changes in processes, quantities stored or handled, or any 
other aspect of the stationary source might reasonably be expected to 
increase or decrease the distance to the endpoint by a factor of two or 
more, the owner or operator shall complete a revised analysis within 
six months of the change and submit a revised risk management plan as 
provided in Sec. 68.190.

Sec. 68.39  Documentation

    The owner or operator shall maintain the following records on the 
offsite consequence analyses:
    (a) For worst-case scenarios, a description of the vessel or 
pipeline and substance selected as worst case, assumptions and 
parameters used, and the rationale for selection; assumptions shall 
include use of any administrative

[[Page 31721]]

controls and any passive mitigation that were assumed to limit the 
quantity that could be released. Documentation shall include the 
anticipated effect of the controls and mitigation on the release 
quantity and rate.
    (b) For alternative release scenarios, a description of the 
scenarios identified, assumptions and parameters used, and the 
rationale for the selection of specific scenarios; assumptions shall 
include use of any administrative controls and any mitigation that were 
assumed to limit the quantity that could be released. Documentation 
shall include the effect of the controls and mitigation on the release 
quantity and rate.
    (c) Documentation of estimated quantity released, release rate, and 
duration of release.
    (d) Methodology used to determine distance to endpoints.
    (e) Data used to estimate population and environmental receptors 
potentially affected.

Sec. 68.42   Five-year accident history.

    (a) The owner or operator shall include in the five-year accident 
history all accidental releases from covered processes that resulted in 
deaths, injuries, or significant property damage on site, or known 
offsite deaths, injuries, evacuations, sheltering in place, property 
damage, or environmental damage.
    (b) Data required. For each accidental release included, the owner 
or operator shall report the following information:
    (1) Date, time, and approximate duration of the release;
    (2) Chemical(s) released;
    (3) Estimated quantity released in pounds;
    (4) The type of release event and its source;
    (5) Weather conditions, if known;
    (6) On-site impacts;
    (7) Known offsite impacts;
    (8) Initiating event and contributing factors if known;
    (9) Whether offsite responders were notified if known; and
    (10) Operational or process changes that resulted from 
investigation of the release.
    (c) Level of accuracy. Numerical estimates may be provided to two 
significant digits.
    9. Subpart C is added to read as follows:

Subpart C--Program 2 Prevention Program

Secs.
68.48 Safety information.
68.50 Hazard review.
68.52 Operating procedures.
68.54 Training.
68.56 Maintenance.
68.58 Compliance audits.
68.60 Incident investigation.

Subpart C--Program 2 Prevention Program

Sec. 68.48  Safety information.

    (a) The owner or operator shall compile and maintain the following 
up-to-date safety information related to the regulated substances, 
processes, and equipment:
    (1) Material Safety Data Sheets that meet the requirements of 29 
CFR 1910.1200(g);
    (2) Maximum intended inventory of equipment in which the regulated 
substances are stored or processed;
    (3) Safe upper and lower temperatures, pressures, flows, and 
compositions;
    (4) Equipment specifications; and
    (5) Codes and standards used to design, build, and operate the 
process.
    (b) The owner or operator shall ensure that the process is designed 
in compliance with recognized and generally accepted good engineering 
practices. Compliance with Federal or state regulations that address 
industry-specific safe design or with industry-specific design codes 
and standards may be used to demonstrate compliance with this 
paragraph.
    (c) The owner or operator shall update the safety information if a 
major change occurs that makes the information inaccurate.

Sec. 68.50  Hazard review.

    (a) The owner or operator shall conduct a review of the hazards 
associated with the regulated substances, process, and procedures. The 
review shall identify the following:
    (1) The hazards associated with the process and regulated 
substances;
    (2) Opportunities for equipment malfunctions or human errors that 
could cause an accidental release;
    (3) The safeguards used or needed to control the hazards or prevent 
equipment malfunction or human error; and
    (4) Any steps used or needed to detect or monitor releases.
    (b) The owner or operator may use checklists developed by persons 
or organizations knowledgeable about the process and equipment as a 
guide to conducting the review. For processes designed to meet industry 
standards or Federal or state design rules, the hazard review shall, by 
inspecting all equipment, determine whether the process is designed, 
fabricated, and operated in accordance with the applicable standards or 
rules.
    (c) The owner or operator shall document the results of the review 
and ensure that problems identified are resolved in a timely manner.
    (d) The review shall be updated at least once every five years. The 
owner or operator shall also conduct reviews whenever a major change in 
the process occurs; all issues identified in the review shall be 
resolved before startup of the changed process.

Sec. 68.52  Operating procedures.

    (a) The owner or operator shall prepare written operating 
procedures that provide clear instructions or steps for safely 
conducting activities associated with each covered process consistent 
with the safety information for that process. Operating procedures or 
instructions provided by equipment manufacturers or developed by 
persons or organizations knowledgeable about the process and equipment 
may be used as a basis for a stationary source's operating procedures.
    (b) The procedures shall address the following:
    (1) Initial startup;
    (2) Normal operations;
    (3) Temporary operations;
    (4) Emergency shutdown and operations;
    (5) Normal shutdown;
    (6) Startup following a normal or emergency shutdown or a major 
change that requires a hazard review;
    (7) Consequences of deviations and steps required to correct or 
avoid deviations; and
    (8) Equipment inspections.
    (c) The owner or operator shall ensure that the operating 
procedures are updated, if necessary, whenever a major change occurs 
and prior to startup of the changed process.

Sec. 68.54  Training.

    (a) The owner or operator shall ensure that each employee presently 
operating a process, and each employee newly assigned to a covered 
process have been trained or tested competent in the operating 
procedures provided in Sec. 68.52 that pertain to their duties. For 
those employees already operating a process on June 21, 1999, the owner 
or operator may certify in writing that the employee has the required 
knowledge, skills, and abilities to safely carry out the duties and 
responsibilities as provided in the operating procedures.
    (b) Refresher training. Refresher training shall be provided at 
least every three years, and more often if necessary, to each employee 
operating a process to ensure that the employee understands and adheres 
to the current operating procedures of the process. The owner or 
operator, in consultation with the employees operating the process, 
shall determine the appropriate frequency of refresher training.

[[Page 31722]]

    (c) The owner or operator may use training conducted under Federal 
or state regulations or under industry-specific standards or codes or 
training conducted by covered process equipment vendors to demonstrate 
compliance with this section to the extent that the training meets the 
requirements of this section.
    (d) The owner or operator shall ensure that operators are trained 
in any updated or new procedures prior to startup of a process after a 
major change.

Sec. 68.56  Maintenance.

    (a) The owner or operator shall prepare and implement procedures to 
maintain the on-going mechanical integrity of the process equipment. 
The owner or operator may use procedures or instructions provided by 
covered process equipment vendors or procedures in Federal or state 
regulations or industry codes as the basis for stationary source 
maintenance procedures.
    (b) The owner or operator shall train or cause to be trained each 
employee involved in maintaining the on-going mechanical integrity of 
the process. To ensure that the employee can perform the job tasks in a 
safe manner, each such employee shall be trained in the hazards of the 
process, in how to avoid or correct unsafe conditions, and in the 
procedures applicable to the employee's job tasks.
    (c) Any maintenance contractor shall ensure that each contract 
maintenance employee is trained to perform the maintenance procedures 
developed under paragraph (a) of this section.
    (d) The owner or operator shall perform or cause to be performed 
inspections and tests on process equipment. Inspection and testing 
procedures shall follow recognized and generally accepted good 
engineering practices. The frequency of inspections and tests of 
process equipment shall be consistent with applicable manufacturers' 
recommendations, industry standards or codes, good engineering 
practices, and prior operating experience.

Sec. 68.58  Compliance audits.

    (a) The owner or operator shall certify that they have evaluated 
compliance with the provisions of this subpart at least every three 
years to verify that the procedures and practices developed under the 
rule are adequate and are being followed.
    (b) The compliance audit shall be conducted by at least one person 
knowledgeable in the process.
    (c) The owner or operator shall develop a report of the audit 
findings.
    (d) The owner or operator shall promptly determine and document an 
appropriate response to each of the findings of the compliance audit 
and document that deficiencies have been corrected.
    (e) The owner or operator shall retain the two (2) most recent 
compliance audit reports. This requirement does not apply to any 
compliance audit report that is more than five years old.

Sec. 68.60  Incident investigation.

    (a) The owner or operator shall investigate each incident which 
resulted in, or could reasonably have resulted in a catastrophic 
release.
    (b) An incident investigation shall be initiated as promptly as 
possible, but not later than 48 hours following the incident.
    (c) A summary shall be prepared at the conclusion of the 
investigation which includes at a minimum:
    (1) Date of incident;
    (2) Date investigation began;
    (3) A description of the incident;
    (4) The factors that contributed to the incident; and,
    (5) Any recommendations resulting from the investigation.
    (d) The owner or operator shall promptly address and resolve the 
investigation findings and recommendations. Resolutions and corrective 
actions shall be documented.
    (e) The findings shall be reviewed with all affected personnel 
whose job tasks are affected by the findings.
    (f) Investigation summaries shall be retained for five years.
    10. Subpart D is added to read as follows:

Subpart D--Program 3 Prevention Program

Sec.
68.65  Process safety information.
68.67  Process hazard analysis.
68.69  Operating procedures.
68.71  Training.
68.73  Mechanical integrity.
68.75  Management of change.
68.77  Pre-startup review.
68.79  Compliance audits.
68.81  Incident investigation.
68.83  Employee participation.
68.85  Hot work permit.
68.87  Contractors.

Subpart D--Program 3 Prevention Program

Sec. 68.65  Process safety information.

    (a) In accordance with the schedule set forth in Sec. 68.67, the 
owner or operator shall complete a compilation of written process 
safety information before conducting any process hazard analysis 
required by the rule. The compilation of written process safety 
information is to enable the owner or operator and the employees 
involved in operating the process to identify and understand the 
hazards posed by those processes involving regulated substances. This 
process safety information shall include information pertaining to the 
hazards of the regulated substances used or produced by the process, 
information pertaining to the technology of the process, and 
information pertaining to the equipment in the process.
    (b) Information pertaining to the hazards of the regulated 
substances in the process. This information shall consist of at least 
the following:
    (1) Toxicity information;
    (2) Permissible exposure limits;
    (3) Physical data;
    (4) Reactivity data:
    (5) Corrosivity data;
    (6) Thermal and chemical stability data; and
    (7) Hazardous effects of inadvertent mixing of different materials 
that could foreseeably occur.

    Note to paragraph (b): Material Safety Data Sheets meeting the 
requirements of 29 CFR 1910.1200(g) may be used to comply with this 
requirement to the extent they contain the information required by 
this subparagraph.

    (c) Information pertaining to the technology of the process.
    (1) Information concerning the technology of the process shall 
include at least the following:
    (i) A block flow diagram or simplified process flow diagram;
    (ii) Process chemistry;
    (iii) Maximum intended inventory;
    (iv) Safe upper and lower limits for such items as temperatures, 
pressures, flows or compositions; and,
    (v) An evaluation of the consequences of deviations.
    (2) Where the original technical information no longer exists, such 
information may be developed in conjunction with the process hazard 
analysis in sufficient detail to support the analysis.
    (d) Information pertaining to the equipment in the process.
    (1) Information pertaining to the equipment in the process shall 
include:
    (i) Materials of construction;
    (ii) Piping and instrument diagrams (P&ID's);
    (iii) Electrical classification;
    (iv) Relief system design and design basis;
    (v) Ventilation system design;
    (vi) Design codes and standards employed;
    (vii) Material and energy balances for processes built after June 
21, 1999; and
    (viii) Safety systems (e.g. interlocks, detection or suppression 
systems).

[[Page 31723]]

    (2) The owner or operator shall document that equipment complies 
with recognized and generally accepted good engineering practices.
    (3) For existing equipment designed and constructed in accordance 
with codes, standards, or practices that are no longer in general use, 
the owner or operator shall determine and document that the equipment 
is designed, maintained, inspected, tested, and operating in a safe 
manner.

Sec. 68.67  Process hazard analysis.

    (a) The owner or operator shall perform an initial process hazard 
analysis (hazard evaluation) on processes covered by this part. The 
process hazard analysis shall be appropriate to the complexity of the 
process and shall identify, evaluate, and control the hazards involved 
in the process. The owner or operator shall determine and document the 
priority order for conducting process hazard analyses based on a 
rationale which includes such considerations as extent of the process 
hazards, number of potentially affected employees, age of the process, 
and operating history of the process. The process hazard analysis shall 
be conducted as soon as possible, but not later than June 21, 1999. 
Process hazards analyses completed to comply with 29 CFR 1910.119(e) 
are acceptable as initial process hazards analyses. These process 
hazard analyses shall be updated and revalidated, based on their 
completion date.
    (b) The owner or operator shall use one or more of the following 
methodologies that are appropriate to determine and evaluate the 
hazards of the process being analyzed.
    (1) What-If;
    (2) Checklist;
    (3) What-If/Checklist;
    (4) Hazard and Operability Study (HAZOP);
    (5) Failure Mode and Effects Analysis (FMEA);
    (6) Fault Tree Analysis; or
    (7) An appropriate equivalent methodology.
    (c) The process hazard analysis shall address:
    (1) The hazards of the process;
    (2) The identification of any previous incident which had a likely 
potential for catastrophic consequences.
    (3) Engineering and administrative controls applicable to the 
hazards and their interrelationships such as appropriate application of 
detection methodologies to provide early warning of releases. 
(Acceptable detection methods might include process monitoring and 
control instrumentation with alarms, and detection hardware such as 
hydrocarbon sensors.);
    (4) Consequences of failure of engineering and administrative 
controls;
    (5) Stationary source siting;
    (6) Human factors; and
    (7) A qualitative evaluation of a range of the possible safety and 
health effects of failure of controls.
    (d) The process hazard analysis shall be performed by a team with 
expertise in engineering and process operations, and the team shall 
include at least one employee who has experience and knowledge specific 
to the process being evaluated. Also, one member of the team must be 
knowledgeable in the specific process hazard analysis methodology being 
used.
    (e) The owner or operator shall establish a system to promptly 
address the team's findings and recommendations; assure that the 
recommendations are resolved in a timely manner and that the resolution 
is documented; document what actions are to be taken; complete actions 
as soon as possible; develop a written schedule of when these actions 
are to be completed; communicate the actions to operating, maintenance 
and other employees whose work assignments are in the process and who 
may be affected by the recommendations or actions.
    (f) At least every five (5) years after the completion of the 
initial process hazard analysis, the process hazard analysis shall be 
updated and revalidated by a team meeting the requirements in paragraph 
(d) of this section, to assure that the process hazard analysis is 
consistent with the current process. Updated and revalidated process 
hazard analyses completed to comply with 29 CFR 1910.119(e) are 
acceptable to meet the requirements of this paragraph.
    (g) The owner or operator shall retain process hazards analyses and 
updates or revalidations for each process covered by this section, as 
well as the documented resolution of recommendations described in 
paragraph (e) of this section for the life of the process.

Sec. 68.69  Operating procedures.

    (a) The owner or operator shall develop and implement written 
operating procedures that provide clear instructions for safely 
conducting activities involved in each covered process consistent with 
the process safety information and shall address at least the following 
elements.
    (1) Steps for each operating phase:
    (i) Initial startup;
    (ii) Normal operations;
    (iii) Temporary operations;
    (iv) Emergency shutdown including the conditions under which 
emergency shutdown is required, and the assignment of shutdown 
responsibility to qualified operators to ensure that emergency shutdown 
is executed in a safe and timely manner.
    (v) Emergency operations;
    (vi) Normal shutdown; and,
    (vii) Startup following a turnaround, or after an emergency 
shutdown.
    (2) Operating limits:
    (i) Consequences of deviation; and
    (ii) Steps required to correct or avoid deviation.
    (3) Safety and health considerations:
    (i) Properties of, and hazards presented by, the chemicals used in 
the process;
    (ii) Precautions necessary to prevent exposure, including 
engineering controls, administrative controls, and personal protective 
equipment;
    (iii) Control measures to be taken if physical contact or airborne 
exposure occurs;
    (iv) Quality control for raw materials and control of hazardous 
chemical inventory levels; and,
    (v) Any special or unique hazards.
    (4) Safety systems and their functions.
    (b) Operating procedures shall be readily accessible to employees 
who work in or maintain a process.
    (c) The operating procedures shall be reviewed as often as 
necessary to assure that they reflect current operating practice, 
including changes that result from changes in process chemicals, 
technology, and equipment, and changes to stationary sources. The owner 
or operator shall certify annually that these operating procedures are 
current and accurate.
    (d) The owner or operator shall develop and implement safe work 
practices to provide for the control of hazards during operations such 
as lockout/tagout; confined space entry; opening process equipment or 
piping; and control over entrance into a stationary source by 
maintenance, contractor, laboratory, or other support personnel. These 
safe work practices shall apply to employees and contractor employees.

Sec. 68.71  Training.

    (a) Initial training. (1) Each employee presently involved in 
operating a process, and each employee before being involved in 
operating a newly assigned process, shall be trained in an overview of 
the process and in the operating procedures as specified in Sec. 68.69. 
The training shall include emphasis on the specific safety and health 
hazards, emergency operations including shutdown, and safe work 
practices applicable to the employee's job tasks.

[[Page 31724]]

    (2) In lieu of initial training for those employees already 
involved in operating a process on June 21, 1999 an owner or operator 
may certify in writing that the employee has the required knowledge, 
skills, and abilities to safely carry out the duties and 
responsibilities as specified in the operating procedures.
    (b) Refresher training. Refresher training shall be provided at 
least every three years, and more often if necessary, to each employee 
involved in operating a process to assure that the employee understands 
and adheres to the current operating procedures of the process. The 
owner or operator, in consultation with the employees involved in 
operating the process, shall determine the appropriate frequency of 
refresher training.
    (c) Training documentation. The owner or operator shall ascertain 
that each employee involved in operating a process has received and 
understood the training required by this paragraph. The owner or 
operator shall prepare a record which contains the identity of the 
employee, the date of training, and the means used to verify that the 
employee understood the training.

Sec. 68.73  Mechanical integrity.

    (a) Application. Paragraphs (b) through (f) of this section apply 
to the following process equipment:
    (1) Pressure vessels and storage tanks;
    (2) Piping systems (including piping components such as valves);
    (3) Relief and vent systems and devices;
    (4) Emergency shutdown systems;
    (5) Controls (including monitoring devices and sensors, alarms, and 
interlocks) and,
    (6) Pumps.
    (b) Written procedures. The owner or operator shall establish and 
implement written procedures to maintain the on-going integrity of 
process equipment.
    (c) Training for process maintenance activities. The owner or 
operator shall train each employee involved in maintaining the on-going 
integrity of process equipment in an overview of that process and its 
hazards and in the procedures applicable to the employee's job tasks to 
assure that the employee can perform the job tasks in a safe manner.
    (d) Inspection and testing. (1) Inspections and tests shall be 
performed on process equipment.
    (2) Inspection and testing procedures shall follow recognized and 
generally accepted good engineering practices.
    (3) The frequency of inspections and tests of process equipment 
shall be consistent with applicable manufacturers' recommendations and 
good engineering practices, and more frequently if determined to be 
necessary by prior operating experience.
    (4) The owner or operator shall document each inspection and test 
that has been performed on process equipment. The documentation shall 
identify the date of the inspection or test, the name of the person who 
performed the inspection or test, the serial number or other identifier 
of the equipment on which the inspection or test was performed, a 
description of the inspection or test performed, and the results of the 
inspection or test.
    (e) Equipment deficiencies. The owner or operator shall correct 
deficiencies in equipment that are outside acceptable limits (defined 
by the process safety information in Sec. 68.65) before further use or 
in a safe and timely manner when necessary means are taken to assure 
safe operation.
    (f) Quality assurance. (1) In the construction of new plants and 
equipment, the owner or operator shall assure that equipment as it is 
fabricated is suitable for the process application for which they will 
be used.
    (2) Appropriate checks and inspections shall be performed to assure 
that equipment is installed properly and consistent with design 
specifications and the manufacturer's instructions.
    (3) The owner or operator shall assure that maintenance materials, 
spare parts and equipment are suitable for the process application for 
which they will be used.

Sec. 68.75  Management of change.

    (a) The owner or operator shall establish and implement written 
procedures to manage changes (except for ``replacements in kind'') to 
process chemicals, technology, equipment, and procedures; and, changes 
to stationary sources that affect a covered process.
    (b) The procedures shall assure that the following considerations 
are addressed prior to any change:
    (1) The technical basis for the proposed change;
    (2) Impact of change on safety and health;
    (3) Modifications to operating procedures;
    (4) Necessary time period for the change; and,
    (5) Authorization requirements for the proposed change.
    (c) Employees involved in operating a process and maintenance and 
contract employees whose job tasks will be affected by a change in the 
process shall be informed of, and trained in, the change prior to 
start-up of the process or affected part of the process.
    (d) If a change covered by this paragraph results in a change in 
the process safety information required by Sec. 68.65 of this part, 
such information shall be updated accordingly.
    (e) If a change covered by this paragraph results in a change in 
the operating procedures or practices required by Sec. 68.69, such 
procedures or practices shall be updated accordingly.

Sec. 68.77  Pre-startup review.

    (a) The owner or operator shall perform a pre-startup safety review 
for new stationary sources and for modified stationary sources when the 
modification is significant enough to require a change in the process 
safety information.
    (b) The pre-startup safety review shall confirm that prior to the 
introduction of regulated substances to a process:
    (1) Construction and equipment is in accordance with design 
specifications;
    (2) Safety, operating, maintenance, and emergency procedures are in 
place and are adequate;
    (3) For new stationary sources, a process hazard analysis has been 
performed and recommendations have been resolved or implemented before 
startup; and modified stationary sources meet the requirements 
contained in management of change, Sec. 68.75.
    (4) Training of each employee involved in operating a process has 
been completed.

Sec. 68.79  Compliance audits.

    (a) The owner or operator shall certify that they have evaluated 
compliance with the provisions of this section at least every three 
years to verify that the procedures and practices developed under the 
standard are adequate and are being followed.
    (b) The compliance audit shall be conducted by at least one person 
knowledgeable in the process.
    (c) A report of the findings of the audit shall be developed.
    (d) The owner or operator shall promptly determine and document an 
appropriate response to each of the findings of the compliance audit, 
and document that deficiencies have been corrected.
    (e) The owner or operator shall retain the two (2) most recent 
compliance audit reports.

Sec. 68.81  Incident investigation.

    (a) The owner or operator shall investigate each incident which 
resulted in, or could reasonably have resulted in a catastrophic 
release of a regulated substance.
    (b) An incident investigation shall be initiated as promptly as 
possible, but not later than 48 hours following the incident.
    (c) An incident investigation team shall be established and consist 
of at least one person knowledgeable in the

[[Page 31725]]

process involved, including a contract employee if the incident 
involved work of the contractor, and other persons with appropriate 
knowledge and experience to thoroughly investigate and analyze the 
incident.
    (d) A report shall be prepared at the conclusion of the 
investigation which includes at a minimum:
    (1) Date of incident;
    (2) Date investigation began;
    (3) A description of the incident;
    (4) The factors that contributed to the incident; and,
    (5) Any recommendations resulting from the investigation.
    (e) The owner or operator shall establish a system to promptly 
address and resolve the incident report findings and recommendations. 
Resolutions and corrective actions shall be documented.
    (f) The report shall be reviewed with all affected personnel whose 
job tasks are relevant to the incident findings including contract 
employees where applicable.
    (g) Incident investigation reports shall be retained for five 
years.

Sec. 68.83  Employee participation.

    (a) The owner or operator shall develop a written plan of action 
regarding the implementation of the employee participation required by 
this section.
    (b) The owner or operator shall consult with employees and their 
representatives on the conduct and development of process hazards 
analyses and on the development of the other elements of process safety 
management in this rule.
    (c) The owner or operator shall provide to employees and their 
representatives access to process hazard analyses and to all other 
information required to be developed under this rule.

Sec. 68.85  Hot work permit.

    (a) The owner or operator shall issue a hot work permit for hot 
work operations conducted on or near a covered process.
    (b) The permit shall document that the fire prevention and 
protection requirements in 29 CFR 1910.252(a) have been implemented 
prior to beginning the hot work operations; it shall indicate the 
date(s) authorized for hot work; and identify the object on which hot 
work is to be performed. The permit shall be kept on file until 
completion of the hot work operations.

Sec. 68.87  Contractors.

    (a) Application. This section applies to contractors performing 
maintenance or repair, turnaround, major renovation, or specialty work 
on or adjacent to a covered process. It does not apply to contractors 
providing incidental services which do not influence process safety, 
such as janitorial work, food and drink services, laundry, delivery or 
other supply services.
    (b) Owner or operator responsibilities. (1) The owner or operator, 
when selecting a contractor, shall obtain and evaluate information 
regarding the contract owner or operator's safety performance and 
programs.
    (2) The owner or operator shall inform contract owner or operator 
of the known potential fire, explosion, or toxic release hazards 
related to the contractor's work and the process.
    (3) The owner or operator shall explain to the contract owner or 
operator the applicable provisions of subpart E of this part.
    (4) The owner or operator shall develop and implement safe work 
practices consistent with Sec. 68.69(d), to control the entrance, 
presence, and exit of the contract owner or operator and contract 
employees in covered process areas.
    (5) The owner or operator shall periodically evaluate the 
performance of the contract owner or operator in fulfilling their 
obligations as specified in paragraph (c) of this section.
    (c) Contract owner or operator responsibilities. (1) The contract 
owner or operator shall assure that each contract employee is trained 
in the work practices necessary to safely perform his/her job.
    (2) The contract owner or operator shall assure that each contract 
employee is instructed in the known potential fire, explosion, or toxic 
release hazards related to his/her job and the process, and the 
applicable provisions of the emergency action plan.
    (3) The contract owner or operator shall document that each 
contract employee has received and understood the training required by 
this section. The contract owner or operator shall prepare a record 
which contains the identity of the contract employee, the date of 
training, and the means used to verify that the employee understood the 
training.
    (4) The contract owner or operator shall assure that each contract 
employee follows the safety rules of the stationary source including 
the safe work practices required by Sec. 68.69(d).
    (5) The contract owner or operator shall advise the owner or 
operator of any unique hazards presented by the contract owner or 
operator's work, or of any hazards found by the contract owner or 
operator's work.
    11. Subpart E is added to read as follows:

Subpart E--Emergency Response

Sec.
68.90  Applicability.
68.95  Emergency Response Program.

Subpart E--Emergency Response

Sec. 68.90  Applicability.

    (a) Except as provided in paragraph (b) of this section, the owner 
or operator of a stationary source with Program 2 and Program 3 
processes shall comply with the requirements of Sec. 68.95.
    (b) The owner or operator of stationary source whose employees will 
not respond to accidental releases of regulated substances need not 
comply with Sec. 68.95 of this part provided that they meet the 
following:
    (1) For stationary sources with any regulated toxic substance held 
in a process above the threshold quantity, the stationary source is 
included in the community emergency response plan developed under 42 
U.S.C. 11003;
    (2) For stationary sources with only regulated flammable substances 
held in a process above the threshold quantity, the owner or operator 
has coordinated response actions with the local fire department; and
    (3) Appropriate mechanisms are in place to notify emergency 
responders when there is a need for a response.

Sec. 68.95  Emergency response program.

    (a) The owner or operator shall develop and implement an emergency 
response program for the purpose of protecting public health and the 
environment. Such program shall include the following elements:
    (1) An emergency response plan, which shall be maintained at the 
stationary source and contain at least the following elements:
    (i) Procedures for informing the public and local emergency 
response agencies about accidental releases;
    (ii) Documentation of proper first-aid and emergency medical 
treatment necessary to treat accidental human exposures; and
    (iii) Procedures and measures for emergency response after an 
accidental release of a regulated substance;
    (2) Procedures for the use of emergency response equipment and for 
its inspection, testing, and maintenance;
    (3) Training for all employees in relevant procedures; and
    (4) Procedures to review and update, as appropriate, the emergency 
response plan to reflect changes at the stationary source and ensure 
that employees are informed of changes.
    (b) A written plan that complies with other Federal contingency 
plan

[[Page 31726]]

regulations or is consistent with the approach in the National Response 
Team's Integrated Contingency Plan Guidance (``One Plan'') and that, 
among other matters, includes the elements provided in paragraph (a) of 
this section, shall satisfy the requirements of this section if the 
owner or operator also complies with paragraph (c) of this section.
    (c) The emergency response plan developed under paragraph (a)(1) of 
this section shall be coordinated with the community emergency response 
plan developed under 42 U.S.C. 11003. Upon request of the local 
emergency planning committee or emergency response officials, the owner 
or operator shall promptly provide to the local emergency response 
officials information necessary for developing and implementing the 
community emergency response plan.
    12. Subpart G is added to read as follows:

Subpart G--Risk Management Plan

Sec.
68.150  Submission.
68.155  Executive summary.
68.160  Registration.
68.165  Offsite consequence analysis.
68.168  Five-year accident history.
68.170  Prevention program/Program 2.
68.175  Prevention program/Program 3.
68.180  Emergency response program.
68.185  Certification.
68.190  Updates.

Subpart G--Risk Management Plan

Sec. 68.150  Submission.

    (a) The owner or operator shall submit a single RMP that includes 
the information required by Secs. 68.155 through 68.185 for all covered 
processes. The RMP shall be submitted in a method and format to a 
central point as specified by EPA prior to June 21, 1999.
    (b) The owner or operator shall submit the first RMP no later than 
the latest of the following dates:
    (1) June 21, 1999;
    (2) Three years after the date on which a regulated substance is 
first listed under Sec. 68.130; or
    (3) The date on which a regulated substance is first present above 
a threshold quantity in a process.
    (c) Subsequent submissions of RMPs shall be in accordance with 
Sec. 68.190.
    (d) Notwithstanding the provisions of Secs. 68.155 to 68.190, the 
RMP shall exclude classified information. Subject to appropriate 
procedures to protect such information from public disclosure, 
classified data or information excluded from the RMP may be made 
available in a classified annex to the RMP for review by Federal and 
state representatives who have received the appropriate security 
clearances.

Sec. 68.155  Executive summary.

    The owner or operator shall provide in the RMP an executive summary 
that includes a brief description of the following elements:
    (a) The accidental release prevention and emergency response 
policies at the stationary source;
    (b) The stationary source and regulated substances handled;
    (c) The worst-case release scenario(s) and the alternative release 
scenario(s), including administrative controls and mitigation measures 
to limit the distances for each reported scenario;
    (d) The general accidental release prevention program and chemical-
specific prevention steps;
    (e) The five-year accident history;
    (f) The emergency response program; and
    (g) Planned changes to improve safety.

Sec. 68.160  Registration.

    (a) The owner or operator shall complete a single registration form 
and include it in the RMP. The form shall cover all regulated 
substances handled in covered processes.
    (b) The registration shall include the following data:
    (1) Stationary source name, street, city, county, state, zip code, 
latitude, and longitude;
    (2) The stationary source Dun and Bradstreet number;
    (3) Name and Dun and Bradstreet number of the corporate parent 
company;
    (4) The name, telephone number, and mailing address of the owner or 
operator;
    (5) The name and title of the person or position with overall 
responsibility for RMP elements and implementation;
    (6) The name, title, telephone number, and 24-hour telephone number 
of the emergency contact;
    (7) For each covered process, the name and CAS number of each 
regulated substance held above the threshold quantity in the process, 
the maximum quantity of each regulated substance or mixture in the 
process (in pounds) to two significant digits, the SIC code, and the 
Program level of the process;
    (8) The stationary source EPA identifier;
    (9) The number of full-time employees at the stationary source;
    (10) Whether the stationary source is subject to 29 CFR 1910.119;
    (11) Whether the stationary source is subject to 40 CFR part 355;
    (12) Whether the stationary source has a CAA Title V operating 
permit; and
    (13) The date of the last safety inspection of the stationary 
source by a Federal, state, or local government agency and the identity 
of the inspecting entity.

Sec. 68.165  Offsite consequence analysis.

    (a) The owner or operator shall submit in the RMP information:
    (1) One worst-case release scenario for each Program 1 process; and
    (2) For Program 2 and 3 processes, one worst-case release scenario 
to represent all regulated toxic substances held above the threshold 
quantity and one worst-case release scenario to represent all regulated 
flammable substances held above the threshold quantity. If additional 
worst-case scenarios for toxics or flammables are required by 
Sec. 68.25(a)(2)(iii), the owner or operator shall submit the same 
information on the additional scenario(s). The owner or operator of 
Program 2 and 3 processes shall also submit information on one 
alternative release scenario for each regulated toxic substance held 
above the threshold quantity and one alternative release scenario to 
represent all regulated flammable substances held above the threshold 
quantity.
    (b) The owner or operator shall submit the following data:
    (1) Chemical name;
    (2) Physical state (toxics only);
    (3) Basis of results (give model name if used);
    (4) Scenario (explosion, fire, toxic gas release, or liquid spill 
and vaporization);
    (5) Quantity released in pounds;
    (6) Release rate;
    (7) Release duration;
    (8) Wind speed and atmospheric stability class (toxics only);
    (9) Topography (toxics only);
    (10) Distance to endpoint;
    (11) Public and environmental receptors within the distance;
    (12) Passive mitigation considered; and
    (13) Active mitigation considered (alternative releases only);

Sec. 68.168  Five-year accident history.

    The owner or operator shall submit in the RMP the information 
provided in Sec. 68.42(b) on each accident covered by Sec. 68.42(a).

Sec. 68.170  Prevention program/Program 2.

    (a) For each Program 2 process, the owner or operator shall provide 
in the RMP the information indicated in paragraphs (b) through (k) of 
this section. If the same information applies

[[Page 31727]]

to more than one covered process, the owner or operator may provide the 
information only once, but shall indicate to which processes the 
information applies.
    (b) The SIC code for the process.
    (c) The name(s) of the chemical(s) covered.
    (d) The date of the most recent review or revision of the safety 
information and a list of Federal or state regulations or industry-
specific design codes and standards used to demonstrate compliance with 
the safety information requirement.
    (e) The date of completion of the most recent hazard review or 
update.
    (1) The expected date of completion of any changes resulting from 
the hazard review;
    (2) Major hazards identified;
    (3) Process controls in use;
    (4) Mitigation systems in use;
    (5) Monitoring and detection systems in use; and
    (6) Changes since the last hazard review.
    (f) The date of the most recent review or revision of operating 
procedures.
    (g) The date of the most recent review or revision of training 
programs;
    (1) The type of training provided--classroom, classroom plus on the 
job, on the job; and
    (2) The type of competency testing used.
    (h) The date of the most recent review or revision of maintenance 
procedures and the date of the most recent equipment inspection or test 
and the equipment inspected or tested.
    (i) The date of the most recent compliance audit and the expected 
date of completion of any changes resulting from the compliance audit.
    (j) The date of the most recent incident investigation and the 
expected date of completion of any changes resulting from the 
investigation.
    (k) The date of the most recent change that triggered a review or 
revision of safety information, the hazard review, operating or 
maintenance procedures, or training.

Sec. 68.175  Prevention program/Program 3.

    (a) For each Program 3 process, the owner or operator shall provide 
the information indicated in paragraphs (b) through (p) of this 
section. If the same information applies to more than one covered 
process, the owner or operator may provide the information only once, 
but shall indicate to which processes the information applies.
    (b) The SIC code for the process.
    (c) The name(s) of the substance(s) covered.
    (d) The date on which the safety information was last reviewed or 
revised.
    (e) The date of completion of the most recent PHA or update and the 
technique used.
    (1) The expected date of completion of any changes resulting from 
the PHA;
    (2) Major hazards identified;
    (3) Process controls in use;
    (4) Mitigation systems in use;
    (5) Monitoring and detection systems in use; and
    (6) Changes since the last PHA.
    (f) The date of the most recent review or revision of operating 
procedures.
    (g) The date of the most recent review or revision of training 
programs;
    (1) The type of training provided--classroom, classroom plus on the 
job, on the job; and
    (2) The type of competency testing used.
    (h) The date of the most recent review or revision of maintenance 
procedures and the date of the most recent equipment inspection or test 
and the equipment inspected or tested.
    (i) The date of the most recent change that triggered management of 
change procedures and the date of the most recent review or revision of 
management of change procedures.
    (j) The date of the most recent pre-startup review.
    (k) The date of the most recent compliance audit and the expected 
date of completion of any changes resulting from the compliance audit;
    (l) The date of the most recent incident investigation and the 
expected date of completion of any changes resulting from the 
investigation;
    (m) The date of the most recent review or revision of employee 
participation plans;
    (n) The date of the most recent review or revision of hot work 
permit procedures;
    (o) The date of the most recent review or revision of contractor 
safety procedures; and
    (p) The date of the most recent evaluation of contractor safety 
performance.

Sec. 68.180  Emergency response program.

    (a) The owner or operator shall provide in the RMP the following 
information:
    (1) Do you have a written emergency response plan?
    (2) Does the plan include specific actions to be taken in response 
to an accidental releases of a regulated substance?
    (3) Does the plan include procedures for informing the public and 
local agencies responsible for responding to accidental releases?
    (4) Does the plan include information on emergency health care?
    (5) The date of the most recent review or update of the emergency 
response plan;
    (6) The date of the most recent emergency response training for 
employees.
    (b) The owner or operator shall provide the name and telephone 
number of the local agency with which the plan is coordinated.
    (c) The owner or operator shall list other Federal or state 
emergency plan requirements to which the stationary source is subject.

Sec. 68.185  Certification.

    (a) For Program 1 processes, the owner or operator shall submit in 
the RMP the certification statement provided in Sec. 68.12(b)(4).
    (b) For all other covered processes, the owner or operator shall 
submit in the RMP a single certification that, to the best of the 
signer's knowledge, information, and belief formed after reasonable 
inquiry, the information submitted is true, accurate, and complete.

Sec. 68.190  Updates.

    (a) The owner or operator shall review and update the RMP as 
specified in paragraph (b) of this section and submit it in a method 
and format to a central point specified by EPA prior to June 21, 1999.
    (b) The owner or operator of a stationary source shall revise and 
update the RMP submitted under Sec. 68.150 as follows:
    (1) Within five years of its initial submission or most recent 
update required by paragraphs (b)(2) through (b)(7) of this section, 
whichever is later.
    (2) No later than three years after a newly regulated substance is 
first listed by EPA;
    (3) No later than the date on which a new regulated substance is 
first present in an already covered process above a threshold quantity;
    (4) No later than the date on which a regulated substance is first 
present above a threshold quantity in a new process;
    (5) Within six months of a change that requires a revised PHA or 
hazard review;
    (6) Within six months of a change that requires a revised offsite 
consequence analysis as provided in Sec. 68.36; and
    (7) Within six months of a change that alters the Program level 
that applied to any covered process.
    (c) If a stationary source is no longer subject to this part, the 
owner or operator shall submit a revised

[[Page 31728]]

registration to EPA within six months indicating that the stationary 
source is no longer covered.
    13. Subpart H is added to read as follows:

Subpart H--Other Requirements

Sec.
Sec. 68.200  Recordkeeping.
Sec. 68.210  Availability of information to the public.
68.215  Permit content and air permitting authority or designated 
agency requirements.
68.220  Audits.

Subpart H--Other Requirements

Sec. 68.200  Recordkeeping.

    The owner or operator shall maintain records supporting the 
implementation of this part for five years unless otherwise provided in 
Subpart D of this part.

Sec. 68.210  Availability of information to the public.

    (a) The RMP required under subpart G of this part shall be 
available to the public under 42 U.S.C. 7414(c).
    (b) The disclosure of classified information by the Department of 
Defense or other Federal agencies or contractors of such agencies shall 
be controlled by applicable laws, regulations, or executive orders 
concerning the release of classified information.

Sec. 68.215  Permit content and air permitting authority or designated 
agency requirements.

    (a) These requirements apply to any stationary source subject to 
this part 68 and parts 70 or 71 of this Chapter. The 40 CFR part 70 or 
par
FR Doc. 96-14597 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)
t 71 permit for the stationary source shall contain:
    (1) A statement listing this part as an applicable requirement;
    (2) Conditions that require the source owner or operator to submit:
    (i) A compliance schedule for meeting the requirements of this part 
by the date provided in Sec. 68.10(a) or;
    (ii) As part of the compliance certification submitted under 40 CFR 
70.6(c)(5), a certification statement that the source is in compliance 
with all requirements of this part, including the registration and 
submission of the RMP.
    (b) The owner or operator shall submit any additional relevant 
information requested by the air permitting authority or designated 
agency.
    (c) For 40 CFR part 70 or part 71 permits issued prior to the 
deadline for registering and submitting the RMP and which do not 
contain permit conditions described in paragraph (a) of this section, 
the owner or operator or air permitting authority shall initiate permit 
revision or reopening according to the procedures of 40 CFR 70.7 or 
71.7 to incorporate the terms and conditions consistent with paragraph 
(a) of this section.
    (d) The state may delegate the authority to implement and enforce 
the requirements of paragraph (e) of this section to a state or local 
agency or agencies other than the air permitting authority. An up-to-
date copy of any delegation instrument shall be maintained by the air 
permitting authority. The state may enter a written agreement with the 
Administrator under which EPA will implement and enforce the 
requirements of paragraph (e) of this section.
    (e) The air permitting authority or the agency designated by 
delegation or agreement under paragraph (d) of this section shall, at a 
minimum:
    (1) Verify that the source owner or operator has registered and 
submitted an RMP or a revised plan when required by this part;
    (2) Verify that the source owner or operator has submitted a source 
certification or in its absence has submitted a compliance schedule 
consistent with paragraph (a)(2) of this section;
    (3) For some or all of the sources subject to this section, use one 
or more mechanisms such as, but not limited to, a completeness check, 
source audits, record reviews, or facility inspections to ensure that 
permitted sources are in compliance with the requirements of this part; 
and
    (4) Initiate enforcement action based on paragraphs (e)(1) and 
(e)(2) of this section as appropriate.

Sec. 68.220  Audits.

    (a) In addition to inspections for the purpose of regulatory 
development and enforcement of the Act, the implementing agency shall 
periodically audit RMPs submitted under subpart G of this part to 
review the adequacy of such RMPs and require revisions of RMPs when 
necessary to ensure compliance with subpart G of this part.
    (b) The implementing agency shall select stationary sources for 
audits based on any of the following criteria:
    (1) Accident history of the stationary source;
    (2) Accident history of other stationary sources in the same 
industry;
    (3) Quantity of regulated substances present at the stationary 
source;
    (4) Location of the stationary source and its proximity to the 
public and environmental receptors;
    (5) The presence of specific regulated substances;
    (6) The hazards identified in the RMP; and
    (7) A plan providing for neutral, random oversight.
    (c) Exemption from audits. A stationary source with a Star or Merit 
ranking under OSHA's voluntary protection program shall be exempt from 
audits under paragraph (b)(2) and (b)(7) of this section.
    (d) The implementing agency shall have access to the stationary 
source, supporting documentation, and any area where an accidental 
release could occur.
    (e) Based on the audit, the implementing agency may issue the owner 
or operator of a stationary source a written preliminary determination 
of necessary revisions to the stationary source's RMP to ensure that 
the RMP meets the criteria of subpart G of this part. The preliminary 
determination shall include an explanation for the basis for the 
revisions, reflecting industry standards and guidelines (such as AIChE/
CCPS guidelines and ASME and API standards) to the extent that such 
standards and guidelines are applicable, and shall include a timetable 
for their implementation.
    (f) Written response to a preliminary determination.
    (1) The owner or operator shall respond in writing to a preliminary 
determination made in accordance with paragraph (e) of this section. 
The response shall state the owner or operator will implement the 
revisions contained in the preliminary determination in accordance with 
the timetable included in the preliminary determination or shall state 
that the owner or operator rejects the revisions in whole or in part. 
For each rejected revision, the owner or operator shall explain the 
basis for rejecting such revision. Such explanation may include 
substitute revisions.
    (2) The written response under paragraph (f)(1) of this section 
shall be received by the implementing agency within 90 days of the 
issue of the preliminary determination or a shorter period of time as 
the implementing agency specifies in the preliminary determination as 
necessary to protect public health and the environment. Prior to the 
written response being due and upon written request from the owner or 
operator, the implementing agency may provide in writing additional 
time for the response to be received.
    (g) After providing the owner or operator an opportunity to respond 
under paragraph (f) of this section, the implementing agency may issue 
the owner or operator a written final determination of necessary 
revisions to

[[Page 31729]]

the stationary source's RMP. The final determination may adopt or 
modify the revisions contained in the preliminary determination under 
paragraph (e) of this section or may adopt or modify the substitute 
revisions provided in the response under paragraph (f) of this section. 
A final determination that adopts a revision rejected by the owner or 
operator shall include an explanation of the basis for the revision. A 
final determination that fails to adopt a substitute revision provided 
under paragraph (f) of this section shall include an explanation of the 
basis for finding such substitute revision unreasonable.
    (h) Thirty days after completion of the actions detailed in the 
implementation schedule set in the final determination under paragraph 
(g) of this section, the owner or operator shall be in violation of 
subpart G of this part and this section unless the owner or operator 
revises the RMP prepared under subpart G of this part as required by 
the final determination, and submits the revised RMP as required under 
Sec. 68.150.
    (i) The public shall have access to the preliminary determinations, 
responses, and final determinations under this section in a manner 
consistent with Sec. 68.210.
    (j) Nothing in this section shall preclude, limit, or interfere in 
any way with the authority of EPA or the state to exercise its 
enforcement, investigatory, and information gathering authorities 
concerning this part under the Act.
    14. Part 68 Appendix A is added to read as follows:

                                 Appendix A to Part 68--Table of Toxic Endpoints                                
                                    [As defined in Sec.  68.22 of this part]                                    
----------------------------------------------------------------------------------------------------------------
                                                                                                        Toxic   
                   CAS No.                                        Chemical name                     endpoint (mg/
                                                                                                         L)     
----------------------------------------------------------------------------------------------------------------
107-02-8.....................................  Acrolein [2-Propenal]..............................       0.0011 
107-13-1.....................................  Acrylonitrile [2-Propenenitrile]...................       0.076  
814-68-6.....................................  Acrylyl chloride [2-Propenoyl chloride]............       0.00090
107-18-6.....................................  Allyl alcohol [2-Propen-1-ol]......................       0.036  
107-11-9.....................................  Allylamine [2-Propen-1-amine]......................       0.0032 
7664-41-7....................................  Ammonia (anhydrous)................................       0.14   
7664-41-7....................................  Ammonia (conc 20% or greater)......................       0.14   
7784-34-1....................................  Arsenous trichloride...............................       0.010  
7784-42-1....................................  Arsine.............................................       0.0019 
10294-34-5...................................  Boron trichloride [Borane, trichloro-].............       0.010  
7637-07-2....................................  Boron trifluoride [Borane, trifluoro-].............       0.028  
353-42-4.....................................  Boron trifluoride compound with methyl ether (1:1)        0.023  
                                                [Boron, trifluoro[oxybis[methane]]-, T-4.                       
7726-95-6....................................  Bromine............................................       0.0065 
75-15-0......................................  Carbon disulfide...................................       0.16   
7782-50-5....................................  Chlorine...........................................       0.0087 
10049-04-4...................................  Chlorine dioxide [Chlorine oxide (ClO2)]...........       0.0028 
67-66-3......................................  Chloroform [Methane, trichloro-]...................       0.49   
542-88-1.....................................  Chloromethyl ether [Methane, oxybis[chloro-].......       0.00025
107-30-2.....................................  Chloromethyl methyl ether [Methane, chloromethoxy-]       0.0018 
4170-30-3....................................  Crotonaldehyde [2-Butenal].........................       0.029  
123-73-9.....................................  Crotonaldehyde, (E)-, [2-Butenal, (E)-]............       0.029  
506-77-4.....................................  Cyanogen chloride..................................       0.030  
108-91-8.....................................  Cyclohexylamine [Cyclohexanamine]..................       0.16   
19287-45-7...................................  Diborane...........................................       0.0011 
75-78-5......................................  Dimethyldichlorosilane [Silane, dichlorodimethyl-].       0.026  
57-14-7......................................  1,1-Dimethylhydrazine [Hydrazine, 1,1-dimethyl-]...       0.012  
106-89-8.....................................  Epichlorohydrin [Oxirane, (chloromethyl)-].........       0.076  
107-15-3.....................................  Ethylenediamine [1,2-Ethanediamine]................       0.49   
151-56-4.....................................  Ethyleneimine [Aziridine]..........................       0.018  
75-21-8......................................  Ethylene oxide [Oxirane]...........................       0.090  
7782-41-4....................................  Fluorine...........................................       0.0039 
50-00-0......................................  Formaldehyde (solution)............................       0.012  
110-00-9.....................................  Furan..............................................       0.0012 
302-01-2.....................................  Hydrazine..........................................       0.011  
7647-01-0....................................  Hydrochloric acid (conc 30% or greater)............       0.030  
74-90-8......................................  Hydrocyanic acid...................................       0.011  
7647-01-0....................................  Hydrogen chloride (anhydrous) [Hydrochloric acid]..       0.030  
7664-39-3....................................  Hydrogen fluoride/Hydrofluoric acid (conc 50% or          0.016  
                                                greater) [Hydrofluoric acid].                                   
7783-07-5....................................  Hydrogen selenide..................................       0.00066
7783-06-4....................................  Hydrogen sulfide...................................       0.042  
13463-40-6...................................  Iron, pentacarbonyl- [Iron carbonyl (Fe(CO)5), (TB-       0.00044
                                                5-11)-].                                                        
78-82-0......................................  Isobutyronitrile [Propanenitrile, 2-methyl-].......       0.14   
108-23-6.....................................  Isopropyl chloroformate [Carbonochloride acid, 1-         0.10   
                                                methylethyl ester].                                             
126-98-7.....................................  Methacrylonitrile [2-Propenenitrile, 2-methyl-]....       0.0027 
74-87-3......................................  Methyl chloride [Methane, chloro-].................       0.82   
79-22-1......................................  Methyl chloroformate [Carbonochloridic acid,              0.0019 
                                                methylester].                                                   
60-34-4......................................  Methyl hydrazine [Hydrazine, methyl-]..............       0.0094 
624-83-9.....................................  Methyl isocyanate [Methane, isocyanato-]...........       0.0012 
74-93-1......................................  Methyl mercaptan [Methanethiol]....................       0.049  
556-64-9.....................................  Methyl thiocyanate [Thiocyanic acid, methyl ester].       0.085  
75-79-6......................................  Methyltrichlorosilane [Silane, trichloromethyl-]...       0.018  
13463-39-3...................................  Nickel carbonyl....................................       0.00067
7697-37-2....................................  Nitric acid (conc 80% or greater)..................       0.026  

[[Page 31730]]

                                                                                                                
10102-43-9...................................  Nitric oxide [Nitrogen oxide (NO)].................       0.031  
8014-95-7....................................  Oleum (Fuming Sulfuric acid) [Sulfuric acid,              0.010  
                                                mixture with sulfur trioxide].                                  
79-21-0......................................  Peracetic acid [Ethaneperoxoic acid]...............       0.0045 
594-42-3.....................................  Perchloromethylmercaptan [Methanesulfenyl chloride,       0.0076 
                                                trichloro-].                                                    
75-44-5......................................  Phosgene [Carbonic dichloride].....................       0.00081
7803-51-2....................................  Phosphine..........................................       0.0035 
10025-87-3...................................  Phosphorus oxychloride [Phosphoryl chloride].......       0.0030 
7719-12-2....................................  Phosphorus trichloride [Phosphorous trichloride]...       0.028  
110-89-4.....................................  Piperidine.........................................       0.022  
107-12-0.....................................  Propionitrile [Propanenitrile].....................       0.0037 
109-61-5.....................................  Propyl chloroformate [Carbonochloridic acid,              0.010  
                                                propylester].                                                   
75-55-8......................................  Propyleneimine [Aziridine, 2-methyl-]..............       0.12   
75-56-9......................................  Propylene oxide [Oxirane, methyl-].................       0.59   
7446-09-5....................................  Sulfur dioxide (anhydrous).........................       0.0078 
7783-60-0....................................  Sulfur tetrafluoride [Sulfur fluoride (SF4), (T-4)-       0.0092 
                                                ].                                                              
7446-11-9....................................  Sulfur trioxide....................................       0.010  
75-74-1......................................  Tetramethyllead [Plumbane, tetramethyl-]...........       0.0040 
509-14-8.....................................  Tetranitromethane [Methane, tetranitro-]...........       0.0040 
7750-45-0....................................  Titanium tetrachloride [Titanium chloride (TiCl4)         0.020  
                                                (T-4)-].                                                        
584-84-9.....................................  Toluene 2,4-diisocyanate [Benzene, 2,4-diisocyanato-      0.0070 
                                                1-methyl-].                                                     
91-08-7......................................  Toluene 2,6-diisocyanate [Benzene, 1,3-diisocyanato-      0.0070 
                                                2-methyl-].                                                     
26471-62-5...................................  Toluene diisocyanate (unspecified isomer) [Benzene,       0.0070 
                                                1,3-diisocyanatomethyl-].                                       
75-77-4......................................  Trimethylchlorosilane [Silane, chlorotrimethyl-]...       0.050  
108-05-4.....................................  Vinyl acetate monomer [Acetic acid ethenyl ester]..       0.26   
----------------------------------------------------------------------------------------------------------------

[FR Doc. 96-14597 Filed 6-19-96; 8:45 am]
BILLING CODE 6560-50-M

Complete official Federal Register PDF

FR Doc. 96-14548 Federal Acquisition Regulation; Termination for Convenience
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31665-31666]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14548]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 52

[FAC 90-39; FAR Case 91-102; Item XXXIII]
RIN 9000-AF55

Federal Acquisition Regulation; Termination for Convenience

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to clarify language in the 
``Termination for Convenience of the Government (Fixed-Price)'' clause. 
This regulatory action was not subject to Office of Management and 
Budget review under Executive Order 12866, dated September 30, 1993, 
and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 91-102.

SUPPLEMENTARY INFORMATION:

A. Background

    A proposed rule was published in the Federal Register at 58 FR 
64826, December 9, 1993. The proposed rule amended the clause at FAR 
52.249-2, Termination for Convenience of the Government (Fixed-Price), 
to clarify existing language. Changes were made to clarify that 
incremental payments may be involved in some instances, such as a 
partial termination action, and to clarify the two instances when the 
contractor forfeits its right of appeal. After evaluation of public 
comments, the Councils agreed to two changes in the proposal. The first 
change revises paragraph (e) of the clause by replacing the word 
``amended'' with the word ``modified.'' The second change revises 
paragraph (i) by deleting the phrase ``following a claim and final 
decision.''

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and

[[Page 31666]]

the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because it simply clarifies 
existing language pertaining to settlement of contract termination 
costs. No comments were received on the impact of this rule on small 
entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 52 is amended as set forth below:

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    1. The authority citation for 48 CFR Part 52 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 52.249-2 is amended by revising the date in the clause 
heading; and revising paragraphs (e) and (i) of the clause to read as 
follows:

Sec. 52.249-2  Termination for Convenience of the Government (Fixed-
Price).

* * * * *

TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (AUG 1996)

* * * * *
    (e) Subject to paragraph (d) of this clause, the Contractor and 
the Contracting Officer may agree upon the whole or any part of the 
amount to be paid or remaining to be paid because of the 
termination. The amount may include a reasonable allowance for 
profit on work done. However, the agreed amount, whether under this 
paragraph (e) or paragraph (f) of this clause, exclusive of costs 
shown in subparagraph (f)(3) of this clause, may not exceed the 
total contract price as reduced by (1) the amount of payments 
previously made and (2) the contract price of work not terminated. 
The contract shall be modified, and the Contractor paid the agreed 
amount. Paragraph (f) of this clause shall not limit, restrict, or 
affect the amount that may be agreed upon to be paid under this 
paragraph.
* * * * *
    (i) The Contractor shall have the right of appeal, under the 
Disputes clause, from any determination made by the Contracting 
Officer under paragraph (d), (f), or (k) of this clause, except that 
if the Contractor failed to submit the termination settlement 
proposal or request for equitable adjustment within the time 
provided in paragraph (d) or (k), respectively, and failed to 
request a time extension, there is no right of appeal.
* * * * *

(End of clause)

* * * * *
[FR Doc. 96-14548 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14547 Federal Acquisition Regulation; Inspection ClausesFixed Price
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31665]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14547]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 52

[FAC 90-39; FAR Case 92-001; Item XXXII]
RIN 9000-AG94

Federal Acquisition Regulation; Inspection Clauses--Fixed Price

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to clarify 
certain Federal Acquisition Regulation (FAR) Inspection clauses 
pertaining to quality assurance by replacing the words ``without 
additional charge'' with the words ``at no increase in contract 
price.'' This regulatory action was not subject to Office of Management 
and Budget review under Executive Order 12866, dated September 30, 
1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4035, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-001.

SUPPLEMENTARY INFORMATION:

A. Background

    An amendment to FAR 52.246-4 published in Federal Acquisition 
Circular 90-09 as FAR case 90-58 (see 56 FR 67135, December 27, 1991), 
included the addition of the phrase ``without additional charge'' in 
paragraph (d). A comment was received questioning the phrase ``without 
additional charge.'' As a result, this final rule replaces the phrase 
``without additional charge'' with the phrase ``at no increase in 
contract price'' in certain FAR Inspection clauses for clarity.

B. Regulatory Flexibility Act

    The final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comments is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected FAR subpart will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAC 90-39, FAR case 92-001), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because these final 
changes to the FAR do not impose recordkeeping or information 
collection requirements, or collections of information from offerors, 
contractors, or members of the public which require the approval of OMB 
under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 52 is amended as set forth below:

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    1. The authority citation for 48 CFR Part 52 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

Sec. 52.246-2, 52.246-4, 52.246-7, 52.246-12, and 52.246-13  [Amended]

    2. The clause dates in sections 52.246-2, 52.246-4, 52.246-7, 
52.246-12, and 52.246-13 are revised to read ``(AUG 1996)''; and 
sections 52.246-2(d), 52.246-4(d), 52.246-7(c), and 52.246-12(e) are 
amended by removing the words ``without additional charge'' and 
inserting ``at no increase in contract price'' in their place; and 
section 52.246-13(a) is amended by removing the words promptly and 
without additional charge'' and inserting ``promptly, and at no 
increase in contract price'' in its place.

[FR Doc. 96-14547 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14546 Federal Acquisition Regulation; Small Business Innovation Research Rights in Data
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31664-31665]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14546]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 52

[FAC 90-39; FAR Case 93-305; Item XXXI]
RIN 9000-AF54

Federal Acquisition Regulation; Small Business Innovation 
Research Rights in Data

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to convert the interim rule 
published at 59 FR 11386, March 10, 1994, to a final rule without 
change. The rule amends the Federal Acquisition Regulation (FAR) to 
implement Section 15(f) of the revised SBIR Program Policy Directive 
published by the Small Business Administration in the Federal Register 
on January 26, 1993 (58 FR 6144). The revision to the clause, Rights in 
Data--SBIR Program, increases the small business concern's data rights 
retention period from 2 to 4 years. This regulatory action was not 
subject to Office of Management and Budget review under Executive Order 
12866, dated September 30, 1993, and is not a major rule under 5 U.S.C. 
804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-305.

SUPPLEMENTARY INFORMATION:

A. Background

    This rule implements Section 15(f) of the revised SBIR Program 
Policy Directive published by the SBA in the Federal Register on 
January 26, 1993 (58 FR 6144). Section 15(f) implements Section 
103(f)(4) of Public Law 102-564, ``Small Business Research and 
Development Enhancement Act of 1992,'' which increases the small 
business concern's data rights retention period from 2 to 4 years.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the rule merely amends 
the FAR to conform to the requirements of the Small Business Innovation 
Research Program Policy Directive published by the Small Business 
Administration. No comments were received on the impact of this rule on 
small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors,

[[Page 31665]]

contractors, or members of the public which require the approval of the 
Office of Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 52

    Government procurement.

Interim Rule Adopted as Final Without Change

    Accordingly, the interim rule amending 48 CFR Part 52, which was 
published at 59 FR 11386, March 10, 1994 (FAC 90-20, Item XIX), is 
adopted as a final rule without change.
    The authority citation for 48 CFR Part 52 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14546 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14545 Federal Acquisition Regulation; Contract AwardSealed Bidding Construction
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31663-31664]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14545]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 52

[FAC 90-39; FAR Case 91-031; Item XXX]
RIN 9000-AE41

Federal Acquisition Regulation; Contract Award--Sealed Bidding--
Construction

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

[[Page 31664]]

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to inform offerors under 
construction solicitations that the Government may reject bids as 
nonresponsive if the prices are materially unbalanced. The proposed 
rule was published in the Federal Register at 56 FR 29539, June 27, 
1991. This regulatory action was not subject to Office of Management 
and Budget review under Executive Order 12866, dated September 30, 
1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 91-31.

SUPPLEMENTARY INFORMATION:

A. Background

    The FAR was previously amended to include unbalanced bidding 
provisions at 52.214-10, Contract Award--Sealed Bidding, and 52.215-16, 
Contract Award, for supplies and services procured under sealed bidding 
and negotiation procedures. At that time, the unbalanced bidding 
provisions were not made applicable to construction solicitations. 
However, the Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have decided that, for consistency, 
construction solicitations should include a similar provision to notify 
offerors that their bids may be rejected as nonresponsive if the prices 
are materially unbalanced.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because unbalanced bidding 
provisions have already been incorporated in solicitations, for other 
than construction, with no known impact on the small business 
community. No comments were received on the impact of this rule on 
small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of OMB under 44 
U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 52 is amended as set forth below:

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    1. The authority citation for 48 CFR Part 52 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 52.214-19 is amended by revising the date of the 
provision to read ``(AUG 1996)''; and by adding paragraph (d) to the 
provision to read as follows:

52.214-19  Contract Award--Sealed Bidding--Construction.

* * * * *

CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

* * * * *
    (d) The Government may reject a bid as nonresponsive if the 
prices bid are materially unbalanced between line items or subline 
items. A bid is materially unbalanced when it is based on prices 
significantly less than cost for some work and prices which are 
significantly overstated in relation to cost for other work, and if 
there is a reasonable doubt that the bid will result in the lowest 
overall cost to the Government even though it may be the low 
evaluated bid, or if it is so unbalanced as to be tantamount to 
allowing an advance payment.

[FR Doc. 96-14545 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14544 Federal Acquisition Regulation; Solicitation ProvisionsContract Clauses
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31663]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14544]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 52

[FAC 90-39; FAR Case 95-603; Item XXIX]
RIN 9000-AG98

Federal Acquisition Regulation; Solicitation Provisions--Contract 
Clauses

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend a 
Federal Acquisition Regulation (FAR) provision to delete the statement 
advising offerors to obtain copies of specifications from General 
Services Administration Business Service Centers. The substance of the 
provision is not changed. Specifications are no longer available at the 
Business Service Centers. This regulatory action was not subject to 
Office of Management and Budget review under Executive Order 12866, 
dated September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405, (202) 501-
4755. Please cite FAC 90-39, FAR case 95-603.

SUPPLEMENTARY INFORMATION:

A. Background

    This final rule amends the provision at FAR 52.211-1 to delete the 
statement that copies of specifications may be obtained from the 
General Services Administration Business Service Centers in Boston, New 
York, Philadelphia, Atlanta, Kansas City, and Fort Worth. Copies of 
specifications are no longer available at the Business Service Centers.

B. Regulatory Flexibility Act

    The final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comments is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected FAR subpart will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAC 90-39, FAR case 95-603), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 52 is amended as set forth below:

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    1. The authority citation for 48 CFR Part 52 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

52.211-1  [Amended]

    2. Section 52.211-1 is amended in the introductory paragraph by 
revising ``11.203(a)'' to read ``11.204(a)''; revising the date of the 
provision to read ``(AUG 1996)''; and in the first sentence of 
paragraph (a) of the provision by removing ``, or from any of the 
General Services Administration Business Service Centers which are 
located in Boston, MA; New York, NY; Philadelphia, PA; Atlanta, GA; 
Kansas City, MO; and Fort Worth, TX.'' and replacing it with a period.

52.211-2 and 52.211-3  [Amended]

    3. Section 52.211-2 is amended in the introductory paragraph by 
revising ``11.203(b)'' to read ``11.204(b)''.
    4. Section 52.211-3 is amended in the introductory paragraph by 
revising ``11.203(c)'' to read ``11.204(c)''.

[FR Doc. 96-14544 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14543 Federal Acquisition Regulation; Quality Assurance Nonconformances
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31662-31663]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14543]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 46

[FAC 90-39; FAR Case 92-027; Item XXVIII]
RIN 9000-AF80

Federal Acquisition Regulation; Quality Assurance Nonconformances

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to provide standardized 
definitions of the terms ``critical nonconformance,'' ``major 
nonconformance,'' and ``minor nonconformance,'' and make other 
conforming amendments as a result of recommendations made by the 
Department of Defense Inspector General. This regulatory action was not 
subject to Office of Management and Budget review under Executive Order 
12866, dated September 30, 1993, and is not a major rule under 5 U.S.C. 
804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-027.

SUPPLEMENTARY INFORMATION:

A. Background

    On September 27, 1990, the Department of Defense Inspector General 
(DoDIG) issued Audit Report 90-113, Nonconforming Products Procured by 
the Defense Industrial Supply Center. The report included 
recommendations that the DoD should use standardized terminology for a 
nonconformance, and that the DoD definition of a nonconformance should 
be in agreement with the FAR. On March 28, 1994 (59 FR 14466), the 
Civilian Agency Acquisition Council and the Defense Acquisition 
Regulations Council published a proposed rule implementing the DoDIG's 
recommendation.
    As a result of evaluating the comments received, changes were made 
to the proposed rule. The changes included deleting the words 
``judgment and experience indicate'' from the definition of ``critical 
nonconformance;'' and adding the words ``of the supplies or services,'' 
to the definition of ``major nonconformance'' after the word 
``failure.''

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the rule merely 
provides standard terminology and definitions and guidance to 
contracting officers pertaining to nonconforming supplies and services. 
No comments were received on the impact of this rule on small entities 
during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 46

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 46 is amended as set forth below:

PART 46--QUALITY ASSURANCE

    1. The authority citation for 48 CFR Part 46 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 46.101 is amended by adding in alphabetical order the 
definitions ``Critical nonconformance'', ``Major nonconformance'', and 
``Minor nonconformance'' to read as follows:

46.101 Definitions.

* * * * *
    Critical nonconformance means a nonconformance that is likely to 
result in hazardous or unsafe conditions for individuals using, 
maintaining, or depending upon the supplies or services; or is likely 
to prevent performance of a vital agency mission.
* * * * *
    Major nonconformance means a nonconformance, other than critical, 
that is likely to result in failure of the supplies or services, or to 
materially reduce the usability of the supplies or services for their 
intended purpose.

[[Page 31663]]

    Minor nonconformance means a nonconformance that is not likely to 
materially reduce the usability of the supplies or services for their 
intended purpose, or is a departure from established standards having 
little bearing on the effective use or operation of the supplies or 
services.
* * * * *
    3. Section 46.103 is amended at the end of paragraph (c) by 
removing ``and''; in paragraph (d) by removing the period and inserting 
``; and''; and by adding paragraph (e) to read as follows:

46.103  Contracting office responsibilities.

* * * * *
    (e) Ensuring that nonconformances are identified, and establishing 
the significance of a nonconformance when considering the acceptability 
of supplies or services which do not meet contract requirements.
    4. Section 46.407 is amended by revising the first sentence of 
paragraph (c)(1) introductory text, and in the third sentence by 
removing the comma after the word ``determination''; revising paragraph 
(d); and revising the first sentence of paragraph (f) to read as 
follows:

46.407  Nonconforming supplies or services.

* * * * *
    (c)(1) In situations not covered by paragraph (b) of this section, 
the contracting officer shall ordinarily reject supplies or services 
when the nonconformance is critical or major. * * *
* * * * *
    (d) If the nonconformance is minor, the cognizant contract 
administration office may make the determination to accept or reject, 
except where this authority is withheld by the contracting office of 
the contracting activity. To assist in making this determination, the 
contract administration office may establish a joint contractor-
contract administrative office review group. Acceptance of supplies and 
services with critical or major nonconformances is outside the scope of 
the review group.
* * * * *
    (f) Each contract under which supplies or services with critical or 
major nonconformances are accepted as authorized in paragraph (c) of 
this section shall be modified to provide for an equitable price 
reduction or other consideration. * * *
* * * * *
[FR Doc. 96-14543 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14542 Federal Acquisition Regulation; Quality Assurance Actions Electronic Screening
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31661-31662]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14542]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 46

[FAC 90-39; FAR Case 92-031; Item XXVII]
RIN 9000-AG06

Federal Acquisition Regulation; Quality Assurance Actions--
Electronic Screening

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to include definitions of the 
terms ``latent defect'' and ``patent defect.'' This regulatory action 
was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993, and is not a major 
rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-031.

SUPPLEMENTARY INFORMATION:

A. Background

    On June 8, 1992, the Department of Defense Inspector General issued 
Audit Report 92-099, Quality Assurance Actions Resulting from 
Electronic Component Screening, which included a recommendation that 
the Defense FAR Supplement be revised to include definitions of the 
terms ``latent defect'' and ``patent defect.'' Since both terms are 
used in the FAR, Part 46 of the FAR is being revised to include uniform 
definitions for use by all acquiring agencies. A proposed rule was 
published in the Federal Register at 59 FR 46386 on September 8, 1994. 
After evaluation of public comments, the Councils agreed to convert the 
proposed rule to a final rule without change.

[[Page 31662]]

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the revision merely 
provides uniform definitions for existing FAR terms. No comments were 
received on the impact of this rule on small entities during the public 
comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 46

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 46 is amended as set forth below:

PART 46--QUALITY ASSURANCE

    1. The authority citation for 48 CFR Part 46 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 46.101 is amended by adding in alphabetical order the 
definitions ``Latent defect'' and ``Patent defect'' to read as follows:

46.101  Definitions.

* * * * *
    Latent defect means a defect which exists at the time of acceptance 
but cannot be discovered by a reasonable inspection.
* * * * *
    Patent defect means any defect which exists at the time of 
acceptance and is not a latent defect.
* * * * *
[FR Doc. 96-14542 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14541 Federal Acquisition Regulation; Quick-Closeout Procedures
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31660-31661]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14541]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 42 and 52

[FAC 90-39; FAR Case 95-009; Item XXVI]
RIN 9000-AG57

Federal Acquisition Regulation; Quick-Closeout Procedures

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to ensure maximum use of the 
quick-closeout procedures. This regulatory action was not subject to 
Office of Management and Budget review under Executive Order 12866, 
dated September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 95-009.

SUPPLEMENTARY INFORMATION:

A. Background

    This final rule amends FAR 42.708, Quick-closeout procedure, the 
clause at FAR 52.216-7, Allowable Cost and Payment, and the clause at 
FAR 52.216-13, Allowable Cost and Payment--Facilities, to ease the 
restrictions and maximize the use of the quick-closeout procedure. This 
rule was based on the recommendations of the Interagency Process Action 
Team (PAT) sponsored by the Air Force Materiel Command. The PAT's 
rationale was that, by raising the dollar limitation of quick-closeout 
procedures to those contracts with total unsettled indirect costs not 
exceeding $1 million in lieu of $500,000, the number of contracts which 
could be closed using quick-closeout procedures would increase. Use of 
this procedure would benefit contractors by allowing them to invoice 
earlier and avoid the administrative costs which would otherwise be 
incurred for tracking these

[[Page 31661]]

contracts until final indirect cost rates are negotiated. In addition, 
the use of quick-closeout procedures is voluntary on the part of the 
contractor to ensure that the contractor does not suffer any loss. The 
final rule (1) revises FAR 42.708(a) by substituting the word ``shall'' 
for ``may''; (2) raises the limitation in FAR 42.708(a)(2)(i) for total 
unsettled indirect costs allocable to any one contract from $500,000 to 
$1 million; and (3) revises FAR 42.708(a)(2)(ii) to permit the 
contracting officer to waive the 15 percent restriction based upon a 
risk assessment that considers contractor's accounting, estimating, and 
purchasing systems; other concerns of the cognizant contract auditors; 
and any other pertinent information. Paragraph (f) of the clause at FAR 
52.216-7 and paragraph (e) of the clause at 52.216-13 have also been 
revised to be consistent with the revisions to 42.708 as outlined 
above.
    A proposed rule was published in the Federal Register on July 25, 
1995 (60 FR 38196). Five comments from two sources were received in 
response to the proposed rule. All comments were considered in the 
development of the final rule.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because most contracts awarded 
to small business are awarded on the basis of a firm-fixed price, and 
settlement of final indirect cost rates is, therefore, not an issue. No 
comments were received on the impact of this rule on small entities 
during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 42 and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Parts 42 and 52 are amended as set forth below:
    1. The authority citation for 48 CFR Parts 42 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 42--CONTRACT ADMINISTRATION

    2. Section 42.708 is amended in the introductory text of paragraph 
(a) by removing ``may'' and inserting ``shall''; and by revising 
paragraph (a)(2) (i) and (ii) to read as follows:

42.708   Quick-closeout procedure.

    (a) * * *
    (2) * * *
    (i) The total unsettled indirect cost to be allocated to any one 
contract does not exceed $1,000,000; and
    (ii) Unless otherwise provided in agency procedures, the cumulative 
unsettled indirect costs to be allocated to one or more contracts in a 
single fiscal year do not exceed 15 percent of the estimated, total 
unsettled indirect costs allocable to cost-type contracts for that 
fiscal year. The contracting officer may waive the 15 percent 
restriction based upon a risk assessment that considers the 
contractor's accounting, estimating, and purchasing systems; other 
concerns of the cognizant contract auditors; and any other pertinent 
information; and
* * * * *

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    3. Section 52.216-7 is amended by revising the date of the clause 
and paragraph (f) to read as follows:

52.216-7   Allowable Cost and Payment.

* * * * *

ALLOWABLE COST AND PAYMENT (AUG 1996)

* * * * *
    (f) Quick-closeout procedures. Quick-closeout procedures are 
applicable when the conditions in FAR 42.708(a) are satisfied.
* * * * *
    4. Section 52.216-13 is amended by revising the introductory 
paragraph, the date in the clause heading, and paragraph (e) to read as 
follows:

52.216-13   Allowable Cost and Payment--Facilities.

    As prescribed in 16.307(g), insert the following clause:

ALLOWABLE COST AND PAYMENT--FACILITIES (AUG 1996)

* * * * *
    (e) Quick-closeout procedures. Quick-closeout procedures are 
applicable when the conditions in FAR 42.708(a) are satisfied.
* * * * *
[FR Doc. 96-14541 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14540 Federal Acquisition Regulation; Child Care Services
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31660]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14540]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 37

[FAC 90-39; FAR Case 91-106; Item XXV]
RIN 9000-AF31

Federal Acquisition Regulation; Child Care Services

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to convert the interim rule 
published in the Federal Register at 59 FR 67050, December 28, 1994, to 
a final rule. The rule amends the Federal Acquisition Regulation (FAR) 
to add a definition of ``child care services'' and to require 
contracting officers to ensure that contracts for child care services 
include requirements for criminal history background checks of 
employees in accordance with 42 U.S.C. 13041. This regulatory action 
was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993, and is not a major 
rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 91-106.

SUPPLEMENTARY INFORMATION:

A. Background

    This rule implements Subtitle E, section 231 of the Crime Control 
Act of 1990 (Pub. L. 101-647), codified at 42 U.S.C. 13041, as amended 
by section 1094 of the Fiscal Year 1992 Defense Authorization Act 
(Public Law 102-190). The effective date for compliance with Public Law 
101-647 was May 29, 1991. Public Law 102-190 was effective upon 
enactment on December 5, 1991.
    In part, section 231 of Public Law 101-647 requires that child care 
employees, hired to provide child care services at a facility operated 
by the Government or under contract with the Government, undergo a 
criminal history background check. The statute broadly defines ``child 
care services'' as child protective services (including the 
investigation of child abuse and neglect reports), social services, 
health and mental health care, child day care, education (whether or 
not directly involved in teaching), foster care, residential care, 
recreational or rehabilitative programs, and detention, correctional, 
or treatment services. Subsequently, section 1094 of Public Law 102-190 
amended 42 U.S.C. 13041 to provide for the provisional supervised 
employment of child care employees prior to the completion of the 
required criminal history background check and specified additional 
safety measures for Federal child care service facilities.

B. Regulatory Flexibility Act

    Under the interim rule, because Subtitle E, Section 231 of the 
Crime Control Act of 1990, Public Law 101-647 (42 U.S.C. 13041), 
requires child care employees hired under contract to undergo a 
criminal history background check, an Initial Regulatory Flexibility 
Act Analysis was prepared. No comments were received.
    The Regulatory Flexibility Act, 5 U.S.C. 601, et seq., applies to 
this final rule and a Final Regulatory Flexibility Analysis (FRFA) has 
been prepared and will be provided to the Chief Counsel for Advocacy 
for the Small Business Administration. A copy of the FRFA may be 
obtained from the FAR Secretariat.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 37

    Government procurement.

Interim Rule Adopted as Final Without Change

    Accordingly, the interim rule amending 48 CFR Part 37, which was 
published at 59 FR 67050, December 28, 1994 (FAC 90-23, Item XXVII) is 
adopted as a final rule without change.
    The authority citation for 48 CFR Part 37 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14540 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14539 Federal Acquisition Regulation; Defense Production Act Amendments
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31659-31660]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14539]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 34 and 52

[FAC 90-39; FAR Case 93-304; Item XXIV]
RIN 9000-AG11

Federal Acquisition Regulation; Defense Production Act Amendments

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to convert the interim rule 
published in the Federal Register at 59 FR 67047, December 28, 1994, to 
a final rule. This rule amends the Federal Acquisition Regulation (FAR) 
to add policy and procedures for testing and qualification, and use of 
industrial resources manufactured or developed with assistance provided 
under Title III of the Defense Production Act (DPA) of 1950. This 
regulatory action was not subject to Office of Management and Budget 
review under Executive Order 12866, dated September 30, 1993, and is 
not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-304.

SUPPLEMENTARY INFORMATION:

A. Background

    Title III of the DPA authorizes various forms of Government 
assistance to encourage expansion of production of capacity and supply 
of industrial resources essential to national defense. The DPA 
Amendments of 1992 (Public Law 102-558) provide for the testing, 
qualification, and use of industrial resources manufactured or 
developed with assistance provided under Title III of the DPA. This 
rule expresses Government policy to pay for such testing, and provides 
definitions, procedures, and a contract clause to implement the policy. 
An interim rule was published in the Federal Register on December 28, 
1994 (59 FR 67047), with a request for public comments. No comments 
were received.

B. Regulatory Flexibility Act

    The addition of FAR Subpart 34.1 may have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because small 
entities are sometimes asked to perform the qualification testing 
required under the rule. A Final Regulatory Flexibility Analysis has 
been prepared and is summarized as follows:
    The change is required to implement amendments to the DPA made by 
Public Law 102-558. The DPA amendments provide for testing, 
qualification, and use of industrial resources manufactured or 
developed with assistance provided under Title III of the DPA. This 
rule expresses Government policy to pay for such testing, and provides 
definitions, procedures, and a contract clause to implement the policy. 
This rule will apply to any small entity that has Government contracts 
that require qualification testing under the Act. A reporting 
requirement is in the rule that requires contractors who perform this 
testing to provide the test results to the Government. No public 
comments were received in response to the statement in the interim rule 
regarding the Regulatory Flexibility Act. There are no alternatives 
that will accomplish the objectives of the rule.

C. Paperwork Reduction Act

    The Paperwork Reduction Act is deemed to apply because the final 
rule contains information collection requirements. Accordingly, a 
request for approval of a new information collection requirement 
concerning the DPA Amendments was submitted to the Office of Management 
and Budget under 44 U.S.C. 3501, et seq., and approved under OMB 
Control No. 9000-0133 effective through September 30, 1997. Public 
comments concerning this request were invited through a Federal 
Register notice at 59 FR 67047, December 28, 1994, and no comments were 
received.

List of Subjects in 48 CFR Parts 34 and 52

    Government procurement.

Interim Rule Adopted as Final Without Change

    Accordingly, the interim rule amending CFR Parts 34 and 52, which 
was published at 59 FR 67047, December 28, 1994 (FAC 90-23, Item XXIV), 
is adopted as a final rule without change.
    The authority citation for 48 CFR Parts 34 and 52 continues to read 
as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

[[Page 31660]]

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14539 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14538 Federal Acquisition Regulation; Alternate Dispute Resolution and Federal Courts Administration Act
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31658-31659]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14538]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 33, 42, and 52

[FAC 90-39; FAR Cases 91-062 and 92-301; Item XXIII]
RIN 9000-AE96/9000-AF35

Federal Acquisition Regulation; Alternate Dispute Resolution and 
Federal Courts Administration Act

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rules adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to adopt two interim rules 
as final: FAR Case 91-62, Alternative Dispute Resolution, published in 
the Federal Register (FR) at 56 FR 67416, December 30, 1991, and 92-
301, Federal Courts Administration Act, published at 59 FR 11380 on 
March 10, 1994. The rules amend the claim certification procedures and 
the Alternative Means of Dispute Resolution (ADR) procedures, and 
implement section 907(a) of the Federal Courts Administration Act of 
1992. These regulatory actions were not subject to Office of Management 
and Budget review under Executive Order 12866, dated September 30, 
1993, and are not major rules under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR cases 91-062 and 92-301.

SUPPLEMENTARY INFORMATION:

A. Background

    Upon passage of the Federal Courts Administration Act (Act) of 
1992, the Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council issued two interim rules implementing 
the changes made by the Act as well as changes to the Alternative 
Disputes Resolution procedures and claim certification procedures. Only 
three parties submitted comments in response to the interim rules. No 
issue was raised by the public comments that

[[Page 31659]]

necessitated changes to the interim rules. The interim rules are, 
therefore, being converted to final rules without change.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the rule simplifies 
policies and procedures for the certification of claims submitted by 
contractors and is intended to reduce the need for costly litigation 
which arose under previous regulations. No comments were received on 
the impact of this rule on small entities during the public comment 
period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 33, 42, and 52

    Government procurement.

Interim Rules Adopted as Final

    Accordingly, the interim rule amending 48 CFR parts 33and 52, which 
was published at 56 FR 67416, December 30, 1991, is adopted as final, 
as amended by the interim rule amending 48 CFR parts 33, 42 and 52, 
published at 59 FR 11380, March 10, 1994, which is hereby adopted as 
final without change.
    The authority citation for 48 CFR parts 33, 42, and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14538 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14537 Federal Acquisition Regulation; Prompt Payment Overseas
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31658]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14537]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 32 and 52

[FAC 90-39; FAR Case 92-046; Item XXII]
RIN 9000-AF41

Federal Acquisition Regulation; Prompt Payment Overseas

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to convert the interim rule 
published in the Federal Register at 59 FR 11379, March 10, 1994, and 
amended by FAR case 94-770 (60 FR 34741, July 3, 1995), to a final 
rule. This rule amends the Federal Acquisition Regulation (FAR) to 
reflect that the Prompt Payment Act applies to overseas contracts. This 
regulatory action was not subject to Office of Management and Budget 
review under Executive Order 12866, dated September 30, 1993, and is 
not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jeremy F. Olson at (202) 501-3221 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-046.

SUPPLEMENTARY INFORMATION:

A. Background

    On January 13, 1992, the Armed Services Board of Contract Appeals 
(ASBCA), in Held & Francke Baukittengesellschaft (ASBCA Nos. 42463 and 
42464), held that FAR 32.901 improperly excluded applicability of the 
Prompt Payment Act (31 U.S.C. 3901, et seq.) to contracts awarded to 
foreign contractors for work performed outside the United States. As a 
result of the ASBCA decision, an interim rule was issued which, in 
effect, makes the Government liable for payment of interest and 
interest penalties under the Act for contracts with foreign contractors 
for work performed or supplies delivered overseas.
    Section 32.901 and the clauses at 52.232-25, 52.232-26, and 52.232-
27 were amended by the interim rule to remove the statements that no 
interest penalty will be paid on contracts awarded to foreign vendors 
outside the United States for work performed outside the United States 
and to remove the definition of ``foreign vendor'' from the clauses. 
That interim rule, as amended on July 3, 1995, is now converted to a 
final rule without further change.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the rule only applies 
to contracts with foreign contractors for work performed overseas by 
extending the Government's liability to pay interest and penalties 
under the Prompt Payment Act to such entities. No comments were 
received on the impact of this rule on small entities during the public 
comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 32 and 52

    Government procurement.

Interim Rule Adopted as Final Without Change

    Accordingly, the interim rule amending CFR Parts 32 and 52, which 
was published at 59 FR 11379, March 10, 1994 (FAC 90-20, Item XIII), 
and further amended by FAR case 94-770 (60 FR 34741, July 3, 1995), is 
adopted as a final rule without further change.
    The authority citation for 48 CFR Parts 32 and 52 continues to read 
as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14537 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14536 Federal Acquisition Regulation; Travel Costs
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31657-31658]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14536]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 31

[FAC 90-39; FAR Case 93-022; Item XXI]
RIN 9000-AG00

Federal Acquisition Regulation; Travel Costs

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council (CAAC) and the Defense 
Acquisition Regulations Council (DARC) have agreed on a final rule to 
amend the Federal Acquisition Regulation (FAR) to specify the 
documentation required to support the allowability of contractors' 
claimed travel costs. This regulatory action was subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993. It is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jeremy F. Olson at (202) 501-3221 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-022.

SUPPLEMENTARY INFORMATION:

A. Background

    A proposed rule was published in the Federal Register at 59 FR 
47777, September 16, 1994, because the CAAC and the DARC determined 
that the FAR did not adequately specify what documentation is required 
to support travel costs incurred under Government contracts. The rule 
reflects a recommendation made by the Office of Federal Procurement 
Policy SWAT Team on Civilian Agency Contracting in its report of 
December 3, 1992, entitled ``Improving Contracting Practices and 
Management Controls on Cost-Type Federal Contracts,'' which found that 
agencies were having difficulty because the travel cost principle is 
silent on the documentation requirements.
    The rule amends FAR 31.205-46 by adding paragraph (a)(7) which sets 
forth specific documentation criteria for travel costs. The major 
difference between the final rule and the proposed rule is that the 
final rule strikes the reference to ``time'' and adds a parenthetical 
after ``place'' in (a)(7)(i) to make the rule consistent with similar 
requirements already imposed by section 274 of the Internal Revenue 
Code for claiming costs for Federal tax purposes (26 U.S.C. 274(d)). 
The final rule also coincides with guidance currently contained in the 
Defense Contract Audit Manual (CAM) at CAM 7-1002.2.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because most contracts awarded 
to small entities are awarded on a competitive, fixed-price basis and 
the cost principles do not apply. No comments were received on the 
impact of this rule on small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 31

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 31 is amended as set forth below:

PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES

    1. The authority citation for 48 CFR Part 31 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 31.205-46 is amended--
    (a) By adding a heading to paragraph (a) and by revising paragraph 
(a)(1);
    (b) By revising the first sentence of paragraph (a)(3)(iv); and
    (c) By adding paragraph (a)(7) immediately preceding paragraph (b) 
to read as follows:

31.205-46  Travel costs.

    (a) Costs for transportation, lodging, meals, and incidental 
expenses. (1) Costs incurred by contractor personnel on official 
company business are allowable, subject to the limitations contained in 
this subsection. Costs for transportation may be based on mileage 
rates, actual costs incurred, or on a combination thereof, provided the 
method used results in a reasonable charge. Costs for lodging, meals, 
and incidental expenses may be based on per diem, actual expenses, or a 
combination thereof, provided the method used results in a reasonable 
charge.
* * * * *
    (3) * * *
    (iv) Documentation to support actual costs incurred shall be in 
accordance with the contractor's established practices, subject to 
paragraph (a)(7) of this subsection, and provided that a receipt is 
required for each expenditure in excess of $25.00. * * *
* * * * *

[[Page 31658]]

    (7) Costs shall be allowable only if the following information is 
documented:
    (i) Date and place (city, town, or other similar designation) of 
the expenses;
    (ii) Purpose of the trip; and
    (iii) Name of person on trip and that person's title or 
relationship to the contractor.

[FR Doc. 96-14536 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14535 Federal Acquisition Regulation; Legislative Lobbying Costs
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31656-31657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14535]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 31

[FAC 90-39; FAR Case 93-006; Item XX]
RIN 9000-AF98

Federal Acquisition Regulation; Legislative Lobbying Costs

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) cost principles concerning 
lobbying costs. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jeremy F. Olson at (202) 501-3221 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-006.

SUPPLEMENTARY INFORMATION:

A. Background

    This FAR case was opened to address issues raised by the Office of 
Management and Budget SWAT team concerning the requirement to maintain 
records which are in addition to normal records maintained to record 
lobbying costs under FAR 31.205-22(f). The FAR rule deletes 31.205-
22(f) because it conflicts with the recordkeeping requirements in 
31.201-6(c), 31.205-22(e), and Cost Accounting Standards (CAS) 405, 
Accounting for Unallowable Costs (48 CFR 9904.405-50(a)). In addition, 
the Councils believe that 31.205-22(f) is inconsistent with the clause 
at 52.203-12, Limitation on Payments to Influence Certain Federal 
Transactions, which requires contractors to disclose lobbying 
activities. The reporting of such activities must necessarily be based 
upon certain contractor records which support the disclosures. The rule 
also removes the prohibition against reimbursing executive lobbying 
costs at 31.205-50 and adds it to the list of specifically unallowable 
lobbying costs at 31.205-22(a). A proposed rule was published in the 
Federal Register at 59 FR 47776 on September 16, 1994. After evaluation 
of public comments, the Councils agreed to convert the proposed rule to 
a final rule without further change.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the revisions clarify a 
condition of allowability for contractors who wish to be reimbursed 
under Government contracts. The revisions eliminate a subsection which 
may be misinterpreted in its application and more accurately describe 
the subject matter of the cost principle. Further, most contracts 
awarded to small entities are awarded on a competitive, fixed-price 
basis and the cost principles do not apply. No comments were received 
on the impact of this rule on small entities during the public comment 
period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors,

[[Page 31657]]

contractors, or members of the public which require the approval of the 
Office of Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 31

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 31 is amended as set forth below:

PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES

    1. The authority citation for 48 CFR Part 31 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 31.205-22 is amended by revising the section heading; at 
the end of paragraph (a)(4) by removing the word ``or''; at the end of 
paragraph (a)(5) by removing the period and inserting ``;or''; by 
adding paragraph (a)(6); and by removing paragraph (f) and 
redesignating paragraph (g) as (f) to read as follows:

31.205-22  Lobbying and political activity costs.

    (a) * * *
    (6) Costs incurred in attempting to improperly influence (see 
3.401), either directly or indirectly, an employee or officer of the 
Executive branch of the Federal Government to give consideration to or 
act regarding a regulatory or contract matter.
* * * * *

31.205-50  [Reserved]

    3. Section 31.205-50 is removed and reserved.

[FR Doc. 96-14535 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14534 Federal Acquisition Regulation; Records Retention
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31655-31656]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14534]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 31

[FAC 90-39; FAR Case 93-020; Item XIX]
RIN 9000-AF99

Federal Acquisition Regulation; Records Retention

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to explicitly state that 
contractors must maintain adequate cost records in order to be 
reimbursed for all claimed costs. This regulatory action was subject to 
Office of Management and Budget review under Executive Order 12866, 
dated September 30, 1993. It is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jeremy F. Olson at (202) 501-3221 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-020.

[[Page 31656]]

SUPPLEMENTARY INFORMATION:

A. Background

    The guidance for determining cost allowability at FAR 31.201-2 
previously did not explicitly state that contractors must maintain 
adequate cost records in order to be reimbursed for all claimed costs 
nor did it specifically state that the contracting officer has the 
authority to disallow costs which are determined to be inadequately 
supported. This requirement and authority have, heretofore, been 
considered to be implicit in the cost principles. However, the Councils 
are revising the FAR to explicitly address these issues because the 
Office of Federal Procurement Policy SWAT Team on Civilian Agency 
Contracting in its report of December 3, 1992, ``Improving Contracting 
Practices and Management Controls on Cost-Type Federal Contracts,'' 
found that agencies were having difficulty because the FAR was silent 
on these issues. A new paragraph (d) is added to FAR 31.201-2 to 
explicitly state that costs claimed for reimbursement must be 
adequately supported and that the contracting officer may disallow 
costs which are inadequately supported. A proposed rule was published 
in the Federal Register at 59 FR 47776 on September 16, 1994. After 
evaluation of public comments, the Councils agreed to convert the 
proposed rule to a final rule without further change.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because most contracts awarded 
to small entities are awarded on a competitive, fixed-price basis and 
the cost principles do not apply. No comments were received on the 
impact of this rule on small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 31

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 31 is amended as set forth below:

PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES

    1. The authority citation for 48 CFR Part 31 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 31.201-2 is amended by adding paragraph (d) to read as 
follows:

31.201-2  Determining allowability.

* * * * *
    (d) A contractor is responsible for accounting for costs 
appropriately and for maintaining records, including supporting 
documentation, adequate to demonstrate that costs claimed have been 
incurred, are allocable to the contract, and comply with applicable 
cost principles in this subpart and agency supplements. The contracting 
officer may disallow all or part of a claimed cost which is 
inadequately supported.

[FR Doc. 96-14534 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14533 Federal Acquisition Regulation; Part 31 Agency Supplements
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31655]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14533]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 31

[FAC 90-39; FAR Case 94-606; Item XVIII]
RIN 9000-AG93

Federal Acquisition Regulation; Part 31 Agency Supplements

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to remove the requirement for 
Civilian Agency Acquisition Council approval for agency supplements to 
FAR Part 31. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jeremy F. Olson at (202) 501-3221 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 94-606.

SUPPLEMENTARY INFORMATION:

A. Background

    The Department of Transportation recommended that FAR 31.101 be 
amended to remove the requirement for Civilian Agency Acquisition 
Council approval for agency supplements to FAR Part 31. The change does 
not amend the requirement for approval of class deviations. 
Accordingly, supplementary coverage will be consistent with the FAR 
Part 31 coverage, unless a class deviation is approved. Therefore, 
advance approval of supplements is considered to be unnecessary.

B. Regulatory Flexibility Act

    The final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comments is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected subpart will be considered in accordance with 5 
U.S.C. 610. Such comments must be submitted separately and cite 5 
U.S.C. 601, et seq. (FAC 90-39, FAR case 94-606), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 31

    Government procurement.
    Dated: June 4, 1996.

Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 31 is amended as set forth below:
    1. The authority citation for 48 CFR Part 31 continues to read as 
follows:

PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 31.101 is amended by removing the third and fourth 
sentences and replacing them with the following text to read as 
follows:

31.101   Objectives.

    * * * To achieve this uniformity, individual deviations concerning 
cost principles require advance approval of the agency head or 
designee. Class deviations for the civilian agencies require advance 
approval of the Civilian Agency Acquisition Council. Class deviations 
for the National Aeronautics and Space Administration require advance 
approval of the Associate Administrator for Procurement. Class 
deviations for the Department of Defense require advance approval of 
the Director of Defense Procurement, Office of the Under Secretary of 
Defense for Acquisition and Technology.

[FR Doc. 96-14533 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14532 Federal Acquisition Regulation; Irrevocable Letters of Credit and Alternatives to Miller Act Bonds
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31651-31655]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14532]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 28 and 52

[FAC 90-39, FAR Case 95-301, Item XVII]
RIN 9000-AG99

Federal Acquisition Regulation; Irrevocable Letters of Credit and 
Alternatives to Miller Act Bonds

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule with request for comment.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to an interim rule to amend 
the Federal Acquisition Regulation (FAR) to implement OFPP Policy 
Letter 91-4 (previously considered under FAR case 91-113, Irrevocable 
Letters of Credit) and provide alternatives to Miller Act Bonds, as 
required by Section 4104(b) of the Federal Acquisition Streamlining Act 
of 1994 (FASA) (Pub. L. 103-355). This regulatory action was not 
subject to Office of Management and Budget review under Executive Order 
12866, dated September 30, 1993, and is not a major rule under 5 U.S.C. 
804.

DATES: Effective Date: June 20,1996.
    Comment Date: Comments should be submitted to the FAR Secretariat 
at the address shown below on or before August 19, 1996 to be 
considered in the formulation of a final rule.

ADDRESSES: Interested parties should submit written comments to: 
General Services Administration, FAR Secretariat (MVRS), 18th & F 
Streets, NW, Room 4035, Attn: Ms. Beverly Fayson, Washington, DC 20405.
    Please cite FAC 90-39, FAR case 95-301 in all correspondence 
related to this case.

FOR FURTHER INFORMATION CONTACT: Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 95-301.

SUPPLEMENTARY INFORMATION:

A. Background

    This interim rule amends FAR Parts 28 and 52 to provide for use of 
Irrevocable Letters of Credit as an alternative to corporate or 
individual sureties as security for Miller Act bonds, and provides 
alternatives to Miller Act bonds for construction contracts valued at 
$25,000 to $100,000, which are no longer subject to the Miller Act, in 
accordance with Section 4104(b)(1) of FASA.

B. Regulatory Flexibility Act

    The interim rule may have a significant economic impact on a 
substantial number of small entities within the meaning of the 
Regulatory Flexibility Act, 5 U.S.C. 601 et seq., because the rule 
provides alternatives to Miller Act bonds for construction contracts 
valued at $25,000 to $100,000. In addition, it offers Irrevocable 
Letters of Credit as an alternative to surety on Miller Act bonds for 
construction contracts over $100,000. These alternatives may be helpful 
to both large and small construction contractors. An Initial Regulatory 
Flexibility Analysis (IRFA) has been prepared and will be provided to 
the Chief Counsel for Advocacy for the Small Business Administration. A 
copy of the IRFA may be obtained from the FAR Secretariat. Comments are 
invited. Comments from small entities concerning the affected FAR 
subpart will be considered in accordance with 5 U.S.C. 610. Such 
comments must be submitted separately and cite 5 U.S.C 601, et seq. 
(FAR Case 95-301), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of OMB under 44 
U.S.C. 3501, et seq.

D. Determination to Issue an Interim Rule

    A determination has been made under the authority of the Secretary 
of Defense (DOD), the Administrator of General Services (GSA), and the 
Administrator of the National Aeronautics and Space Administration 
(NASA) that compelling reasons exist to promulgate this interim rule 
without prior opportunity for public comment. This action is necessary 
because Section 4104(b) of the Federal Acquisition Streamlining Act of 
1994 (Public Law 103-355), regarding Irrevocable Letters of Credit and 
alternatives to Miller Act Bonds, requires immediate implementation. 
However, pursuant to Public Law 98-577 and FAR 1.501, public comments 
received in response to this interim rule will be considered in the 
formation of the final rule.

List of Subjects in 48 CFR Parts 28 and 52

    Government procurement.

[[Page 31652]]

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
    Therefore, 48 CFR parts 28 and 52 are amended as set forth below:
    1. The authority citation for 48 CFR parts 28 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 28--BONDS AND INSURANCE

    2. Section 28.001 is amended in the definition of ``Bond'' by 
revising the first sentence; and adding, in alphabetical order, the 
definition ``Irrevocable letter of credit'' to read as follows:

28.001  Definitions.

* * * * *
    Bond means a written instrument executed by a bidder or contractor 
(the ``principal''), and a second party (``the surety'' or 
``sureties'') (except as provided in 28.204), to assure fulfillment of 
the principal's obligations to a third party (the ``obligee'' or 
``Government''), identified in the bond. * * *
* * * * *
    Irrevocable letter of credit (ILC) means a written commitment by a 
federally insured financial institution to pay all or part of a stated 
amount of money on demand to the Government (the beneficiary) until the 
expiration date of the letter. The letter of credit cannot be revoked 
or conditioned.
* * * * *

28.102  Performance and payment bonds and alternative payment 
protections for construction contracts.

    3. The heading at section 28.102 is revised as set forth above.
    4. Section 28.102-1 is amended in paragraph (a) introductory text 
by revising ``$25,000'' to read ``$100,000''; redesignating paragraph 
(b) as (c) and adding after the word ``bonds'' the phrase ``or 
alternative payment protection''; and adding (b)(1) and (b)(2). The 
revised text reads as follows:

28.102-1   General.

* * * * *
    (b)(1) Pursuant to Section 4104(b)(2) of the Federal Acquisition 
Streamlining Act of 1994 (Public Law 103-355), for construction 
contracts greater than $25,000, but not greater than $100,000, the 
contracting officer shall select two or more of the following payment 
protections, giving particular consideration to inclusion of an 
irrevocable letter of credit as one of the selected alternatives:
    (i) A payment bond.
    (ii) An irrevocable letter of credit (ILC).
    (iii) A tripartite escrow agreement. The prime contractor 
establishes an escrow account in a federally insured financial 
institution and enters into a tripartite escrow agreement with the 
financial institution, as escrow agent, and all of the suppliers of 
labor and material. The escrow agreement shall establish the terms of 
payment under the contract and of resolution of disputes among the 
parties. The Government makes payments to the contractor's escrow 
account, and the escrow agent distributes the payments in accordance 
with the agreement, or triggers the disputes resolution procedures if 
required.
    (iv) Certificates of deposit. The contractor deposits certificates 
of deposit from a federally insured financial institution with the 
contracting officer, in an acceptable form, executable by the 
contracting officer.
    (v) A deposit of the types of security listed in 28.204-1 and 
28.204-2.
    (2) The contractor shall submit to the Government one of the 
payment protections selected by the contracting officer.
* * * * *
    5. Section 28.102-2 is amended by--
    (a) Revising the heading of paragraph (b) and (b)(1) introductory 
text;
    (b) In the last sentence of paragraph (b)(2) by removing 
``subparagraph (1) immediately above'' and inserting ``paragraph (b)(1) 
of this subsection'' in its place;
    (c) At the end of paragraph (b)(3) by removing the period and 
inserting ``, or to furnish additional alternative payment 
protection.'' in its place;
    (d) In paragraph (c)(1) and the first sentence of (c)(2) by 
inserting after the word ``bonds'' the phrase ``or alternative payment 
protection'';
    (e) In the second sentence of paragraph (c)(2) by removing the word 
``above'' and inserting ``of this subsection'' in its place;
    (f) Adding paragraph (d). The revised text reads as follows:

28.102-2  Amount required.

* * * * *
    (b) Payment bonds or alternative payment protection. (1) The penal 
amount of payment bonds or alternative payment protection shall equal--
* * * * *
    (d) Reducing amounts. The contracting officer has the discretion to 
reduce the amount of security to support a bond, subject to the 
conditions of 28.203-5(c) or 28.204(b).
    6. Section 28.102-3 is amended by revising the section heading; 
redesignating paragraphs (a), (b) and (c) as (a)(1), (a)(2) and (a)(3), 
respectively; redesignating the undesignated introductory paragraph as 
paragraph (a); and adding paragraph (b) to read as follows:

28.102-3   Solicitation requirements and contract clause.

* * * * *
    (b) Insert the clause at 52.228-13, Alternative Payment 
Protections, in solicitations and contracts for construction, when the 
estimated or actual value exceeds $25,000 but does not exceed $100,000. 
Complete the clause by specifying the payment protection or protections 
selected (see 28.102-1(b)(1)), the penal amount required, and the 
deadline for submission.
    7. Section 28.106-3 is amended by revising the section heading and 
adding paragraph (c) to read as follows:

28.106-3  Additional bond or security.

* * * * *
    (c) When an ILC is used as an alternative to corporate or 
individual sureties as security for a performance or payment bond and 
the contract performance period is extended, the contracting officer 
shall require the contractor to provide an ILC with an appropriately 
extended maturity that meets the requirements of 28.204-3(f).
    8. Section 28.106-5 is amended by redesignating paragraph (b) as 
(c); and adding a new paragraph (b) to read as follows:

Sec. 28.106-5  Consent of surety.

* * * * *
    (b) When a contract for which performance or payment is secured by 
any of the types of security listed in 28.204 is modified as described 
in paragraph (a) of this subsection, no consent of surety is required.
* * * * *
    9. Section 28.106-8 is added to read as follows:

28.106-8  Payment to subcontractors or suppliers.

    The contracting officer will only authorize payment from an ILC (or 
any other cash equivalent security) upon a judicial determination of 
the rights of the parties, a signed notarized statement by the 
contractor that the payment is due and owed, or a signed agreement 
between the parties as to amount due and owed.
    10. Section 28.203-5 is amended by redesignating paragraph (a)(2) 
as (a)(3) and revising the heading; adding a new

[[Page 31653]]

paragraph (a)(2); and in the second sentence of paragraph (c) by 
removing ``and (2)'' and inserting in its place ``through (3)''. The 
revised text reads as follows:

28.203-5  Release of lien.

* * * * *
    (a) * * *
    (2) Contracts subject to alternative payment protection (28.102-
1(b)(1)). The security interest shall be maintained for the full 
contract performance period plus one year.
    (3) Other contracts not subject to the Miller Act. * * *
* * * * *
    11. Section 28.204 is revised to read as follows:

28.204  Alternatives in lieu of corporate or individual sureties.

    (a) Any person required to furnish a bond to the Government may 
furnish any of the types of security listed in 28.204-1 through 28.204-
3 instead of a corporate or individual surety for the bond. When any of 
those types of security are deposited, a statement shall be 
incorporated in the bond form pledging the security. The contractor 
shall execute the bond forms as the principal. Agencies shall establish 
safeguards to protect against loss of the security and shall return the 
security or its equivalent to the contractor when the bond obligation 
has ceased.
    (b) Upon written request by any contractor securing a performance 
or payment bond by any of the types of security listed in 28.204-1 
through 28.204-3, the contracting officer may release a portion of the 
security only when the conditions allowing the partial release of lien 
in 28.203-5(c) are met. The contractor shall, as a condition of the 
partial release, furnish an affidavit agreeing that the release of such 
security does not relieve the contractor of its obligations under the 
bond(s).
    (c) The contractor may satisfy a requirement for bond security by 
furnishing a combination of the types of security listed in 28.204-1 
through 28.204-3 or a combination of bonds supported by these types of 
security and additional surety bonds under 28.202 or 28.203. During the 
period for which a bond supported by security is required, the 
contractor may substitute one type of security listed in 28.204-1 
through 28.204-3 for another, or may substitute, in whole or 
combination, additional surety bonds under 28.202 or 28.203.
    12. Sections 28.204-3 and 28.204-4 are added to read as follows:

28.204-3  Irrevocable letter of credit (ILC).

    (a) Any person required to furnish a bond has the option to furnish 
a bond secured by an ILC in an amount equal to the penal sum required 
to be secured (see 28.204). A separate ILC is required for each bond.
    (b) The ILC shall be irrevocable, unconditional, expire only as 
provided in paragraph (f) of this subsection, and be issued by an 
acceptable federally insured financial institution as provided in 
paragraph (g) of this subsection. ILCs over $5 million must be 
confirmed by another acceptable financial institution that had letter 
of credit business of at least $25 million in the past year.
    (c) To draw on the ILC, the contracting officer shall use the sight 
draft set forth in the clause at 52.228-14 and present it with the ILC 
to the issuing financial institution or the confirming financial 
institution (if any).
    (d) If the contractor does not furnish an acceptable replacement 
ILC, or other acceptable substitute, at least 30 days before an ILC's 
scheduled expiration, the contracting officer shall immediately draw on 
the ILC.
    (e) If, after the period of performance of a contract where ILCs 
are used to support payment bonds, there are outstanding claims against 
the payment bond, the contracting officer shall draw on the ILC prior 
to the expiration date of the ILC to cover these claims.
    (f) Expiration dates shall be established as follows:
    (1) If used as a bid guarantee, the ILC should expire no earlier 
than 60 days after the close of the bid acceptance period.
    (2) If used as an alternative to corporate or individual sureties 
as security for a performance or payment bond, the offeror/contractor 
may submit an ILC to cover the entire period of performance or an ILC 
with an initial expiration date which is a minimum period of one year 
from the date of issuance, with a provision which states that the ILC 
is automatically extended without amendment for one year from the 
expiration date, or any future expiration date, until the period of 
performance is completed. The final expiration date shall be:
    (i) For contracts subject to the Miller Act, the later of--
    (A) One year following the expected date of final payment;
    (B) For performance bonds only, until completion of any warranty 
period; or
    (C) For payment bonds only, until resolution of all claims filed 
against the payment bond during the one-year period following final 
payment.
    (ii) For contracts not subject to the Miller Act, the later of--
    (A) 90 days following final payment; or
    (B) Until completion of any warranty period for performance bonds 
only.
    (g) The ILC shall be issued or confirmed by a federally insured 
financial institution rated investment grade or higher.
    (1) The offeror/contractor shall provide the contracting officer a 
credit rating that indicates the financial institution has the required 
rating(s) as of the date of issuance of the ILC.
    (2) If the contracting officer learns that a financial 
institution's rating has dropped below the required level, the 
contracting officer shall give the contractor 30 days to substitute an 
acceptable ILC or shall draw on the ILC using the sight draft in 
paragraph (g) of the clause at 52.228-14.
    (h) Additional information on credit rating services and investment 
grade ratings, and a copy of the Uniform Customs and Practice (UCP) for 
Documentary Credits, 1983 Revision, International Chamber of Commerce 
Publication No. 400, is contained within the Office of Federal 
Procurement Policy Pamphlet No. 7, Use of Irrevocable Letters of 
Credit. This pamphlet may be obtained by calling the Office of 
Management and Budget's publications office at (202) 395-7332.

28.204-4  Contract clause.

    Insert the clause at 52.228-14, Irrevocable Letter of Credit, in 
solicitations and contracts for services, supplies, or construction, 
when a bid guarantee, or performance bonds, or performance and payment 
bonds are required.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    13. Section 52.228-2 is amended by revising the introductory text, 
the date in the clause heading, and paragraph (a) of the clause; in 
paragraph (b) by removing ``or''; at the end of paragraph (c) by 
removing the period and replacing it with ``; or''; and adding 
paragraph (d) to read as follows:

52.228-2  Additional Bond Security.

    As prescribed in 28.106-4, insert the following clause:

ADDITIONAL BOND SECURITY (JUN 1996)

* * * * *
    (a) Any surety upon any bond, or issuing financial institution 
for other security, furnished with this contract becomes 
unacceptable to the Government;
* * * * *
    (d) The contract performance period is extended and an 
irrevocable letter of credit (ILC) is used as security. If the 
Contractor

[[Page 31654]]

does not furnish an acceptable extension or replacement ILC, or 
other acceptable substitute, at least 30 days before an ILC's 
scheduled expiration, the Contracting Officer has the right to 
immediately draw on the ILC.

(End of clause)

    14. Sections 52.228-13 and 52.228-14 are added to read as follows:

52.228-13  Alternative Payment Protections.

    As prescribed in 28.102-3(b), insert the following clause:

ALTERNATIVE PAYMENT PROTECTIONS (JUN 1996)

    (a) The Contractor shall submit one of the following payment 
protections:

----------------------------------------------------------------------

----------------------------------------------------------------------

----------------------------------------------------------------------
    (b) The penal sum of the payment protection shall be in the 
amount of $ __________.
    (c) The submission of the payment protection is required by 
____________________.
    (d) The payment protection shall provide protection for the full 
contract performance period plus a one-year period.
    (e) Except for escrow agreements and payment bonds, which 
provide their own protection procedures, the Contracting Officer is 
authorized to access funds under the payment protection when it has 
been alleged in writing by a supplier of labor or material that a 
nonpayment has occurred, and to withhold such funds pending 
resolution by administrative or judicial proceedings or mutual 
agreement of the parties.
    (f) When a tripartite escrow agreement is used, the Contractor 
shall utilize only suppliers of labor and material who signed the 
escrow agreement.

(End of clause)

52.228-14  Irrevocable Letter of Credit.

    As prescribed in 28.204-4, insert the following clause:

IRREVOCABLE LETTER OF CREDIT (JUN 1996)

    (a) Irrevocable letter of credit (ILC), as used in this clause, 
means a written commitment by a federally insured financial 
institution to pay a stated amount of money on demand to the 
Government (the beneficiary), until the expiration date of the 
letter. Neither the financial institution nor the offeror/Contractor 
can revoke or condition the letter of credit.
    (b) If the offeror intends to use an ILC in lieu of a bid bond, 
or to support other types of bonds such as performance and payment 
bonds, the letter of credit and letter of confirmation formats in 
paragraphs (e) and (f) of this clause shall be used.
    (c) The letter of credit shall be irrevocable, unconditional, 
issued by an acceptable federally insured financial institution as 
provided in paragraph (d) of this clause, and--
    (1) If used as a bid guarantee, the ILC shall expire no earlier 
than 60 days after the close of the bid acceptance period;
    (2) If used to secure a performance or payment bond, the 
offeror/Contractor may submit an ILC to cover the entire period of 
performance or may submit an ILC with an initial expiration date 
which is a minimum period of one year from the date of issuance, 
with a provision which states that the ILC is automatically extended 
without amendment for one year from the expiration date, or any 
future expiration date, until the period of performance is 
completed. The final expiration date shall be:
    (i) For contracts subject to the Miller Act, the later of--
    (A) One year following the expected date of final payment;
    (B) For performance bonds only, until completion of any warranty 
period; or
    (C) For payment bonds only, until resolution of all claims filed 
against the payment bond during the one-year period following final 
payment.
    (ii) For contracts not subject to the Miller Act, the later of--
    (A) 90 days following final payment; or
    (B) Until completion of any warranty period for performance 
bonds only.
    (d) The ILC shall be issued or confirmed by a federally insured 
financial institution rated investment grade or higher. The offeror/
Contractor shall provide the Contracting Officer a credit rating 
that indicates the financial institution has the required rating(s) 
as of the date of issuance of the ILC. ILCs over $5 million must be 
confirmed by another acceptable financial institution that had 
letter of credit business of at least $25 million in the past year.
    (e) The following format shall be used by the issuing financial 
institution to create an ILC:

----------------------------------------------------------------------
[Issuing Financial Institution's Letterhead or Name and Address]

Issue Date-------------------------------------------------------------

Irrevocable Letter of Credit No.---------------------------------------
Account party's name---------------------------------------------------
Account party's address------------------------------------------------
For Solicitation No.---------------------------------------------------
(For reference only)
    TO: [U.S. Government agency]
    [U.S. Government agency's address]
    1. We hereby establish this irrevocable, unconditional, and 
transferable Letter of Credit in your favor for one or more drawings 
up to United States $__________. This Letter of Credit is payable at 
[issuing financial institution's and, if any, confirming financial 
institution's] office at [issuing financial institution's address 
and, if any, confirming financial institution's address] and expires 
with our close of business on __________, or any automatically 
extended expiration date.
    2. We hereby undertake to honor your or transferee's sight 
draft(s) drawn on issuing and, if any, confirming financial 
institution, for all or any part of this credit that is presented at 
the office specified in paragraph 1 of this Letter of Credit on or 
before the expiration date or any automatically extended expiration 
date.
    3. [This paragraph is omitted if used as a bid guarantee, and 
subsequent paragraphs are renumbered.] It is a condition of this 
Letter of Credit that it is deemed to be automatically extended 
without amendment for one year from the expiration date hereof, or 
any future expiration date, unless at least 60 days prior to any 
expiration date, we notify you or the transferee by registered mail, 
or other receipted means of delivery, that we elect not to consider 
this Letter of Credit renewed for any such additional period. At the 
time we notify you, we also agree to notify the account party (and 
confirming financial institution, if any) by the same means of 
delivery.
    4. This Letter of Credit is transferable. Transfers and 
assignments of proceeds are to be effected without charge to either 
the beneficiary or the transferee/assignee of proceeds.
    5. This Letter of Credit is subject to the Uniform Customs and 
Practice (UCP) for Documentary Credits, 1983 Revision, International 
Chamber of Commerce Publication No. 400, and to the extent not 
inconsistent therewith, to the laws of ____________ [state of 
confirming financial institution, if any, otherwise state of issuing 
financial institution].
    6. If this credit expires during an interruption of business of 
this financial institution as described in Article 19 of the UCP, 
the financial institution specifically agrees to effect payment if 
this credit is drawn against within 30 calendar days after the 
resumption of our business.

        Sincerely,

[Issuing financial institution]
    (f) The following format shall be used by the financial 
institution to confirm an ILC:

[Confirming Financial Institution's Letterhead or Name and Address]---

____________________, 19______

Our Letter of Credit
Advice Number----------------------------------------------------------
Beneficiary:-----------------------------------------------------------
[U.S. Government agency]
Issuing Financial Institution:-----------------------------------------
Issuing Financial Institution's LC No.:--------------------------------
    Gentlemen:
    1. We hereby confirm the above indicated Letter of Credit, the 
original of which is attached, issued by __________ [name of issuing 
financial institution] for drawings of up to United States dollars 
__________/U.S. $__________ and expiring with our close of business 
on __________ [the expiration date], or any automatically extended 
expiration date.
    2. Draft(s) drawn under the Letter of Credit and this 
Confirmation are payable at our office located at ____________.
    3. We hereby undertake to honor sight draft(s) drawn under the 
Letter of Credit and this Confirmation if presented at our offices 
as specified herein.
    4. [This paragraph is omitted if used as a bid guarantee, and 
subsequent paragraphs are renumbered.] It is a condition of this 
confirmation that it be deemed automatically extended without 
amendment for one year from the expiration date hereof, or any 
automatically extended expiration date, unless:
    (a) At least sixty (60) days prior to any such expiration date 
we shall notify the

[[Page 31655]]

Contracting Officer, or the transferee and the issuing financial 
institution, by registered mail or other receipted means of 
delivery, that we elect not to consider this confirmation extended 
for any such additional period; or
    (b) The issuing financial institution shall have exercised its 
right to notify you or the transferee, the account party, and 
ourselves, of its election not to extend the expiration date of the 
Letter of Credit.
    5. This confirmation is subject to the Uniform Customs and 
Practice (UCP) for Documentary Credits, 1983 Revision, International 
Chamber of Commerce Publication No. 400, and to the extent not 
inconsistent therewith, to the laws of __________ [state of 
confirming financial institution].
    6. If this confirmation expires during an interruption of 
business of this financial institution as described in Article 19 of 
the UCP, we specifically agree to effect payment if this credit is 
drawn against within 30 calendar days after the resumption of our 
business.
Sincerely,
----------------------------------------------------------------------
[Confirming financial institution]

    (g) The following format shall be used by the Contracting 
Officer for a sight draft to draw on the Letter of Credit:
SIGHT DRAFT

----------------------------------------------------------------------
[City, State]
____________________, 19______
[Name and address of financial institution]
Pay to the order of----------------------------------------------------
[Beneficiary Agency] __________

the sum of United States $ __________-------------------------
This draft is drawn under----------------------------------------------
Irrevocable Letter of Credit No.---------------------------------------
----------------------------------------------------------------------
[Beneficiary Agency]
By: ____________________
(End of clause)
[FR Doc. 96-14532 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14531 Federal Acquisition Regulation; Fluctuating Exchange Rates
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31650-31651]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14531]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 25 and 52

[FAC 90-39; FAR Case 92-048; Item XVI]
RIN 9000-AF83

Federal Acquisition Regulation; Fluctuating Exchange Rates

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to provide guidance and a 
solicitation provision regarding evaluation of foreign currency offers. 
This regulatory action was not subject to Office of Management and 
Budget review under Executive Order 12866, dated September 30, 1993, 
and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Peter O'Such at (202) 501-1759 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-048.

SUPPLEMENTARY INFORMATION:

A. Background

    An amendment to FAR Subpart 25.5 and a corresponding solicitation 
provision were published in the Federal Register as a proposed rule, 
with a request for comments (see 59 FR 16391, April 6, 1994). Two 
responses were received. The Council's analysis of those comments 
resulted in a revision to the rule to delete ``commercially available'' 
in the description of the current market exchange rate used in the 
evaluation of foreign currency offers. The final rule also adds 
language at 25.501(b) and 52.225-4 to address evaluation of offers in 
negotiated acquisitions, when award is based on initial offers 
received.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the rule pertains to 
contracts entered into and performed overseas and, with rare 
exceptions, will affect only foreign concerns. No comments were 
received on the impact of this rule on small entities during the public 
comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 25 and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Parts 25 and 52 are amended as set forth below:
    1. The authority citation for 48 CFR Parts 25 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 25--FOREIGN ACQUISITION

    2. In part 25, subpart 25.5, the heading is revised to read as 
follows:

Subpart 25.5--Use of Foreign Currency

    3. Section 25.501 is revised to read as follows:

25.501  Policy.

    (a) Unless a specific currency is required by international 
agreement or by the Trade Agreements Act (see 25.405(d)), contracting 
officers shall determine whether solicitations for contracts to be 
entered into and performed outside the United States will require 
submission of offers either in U.S. currency or in a specified foreign

[[Page 31651]]

currency. In unusual circumstances, the contracting officer may permit 
submission of offers in other than a specified currency.
    (b) To ensure a fair evaluation of offers, solicitations should 
generally require all offers to be priced in the same currency. 
However, if submission of offers in other than a specified currency is 
permitted, the contracting officer shall convert the offered prices to 
U.S. currency for evaluation purposes. The contracting officer shall 
use the current market exchange rate from a commonly used source in 
effect on the
    (1) Date of bid opening for sealed bid acquisitions,
    (2) Closing date for negotiated acquisitions when award is based on 
initial offers, or
    (3) Due date for receipt of best and final offers, for other 
negotiated acquisitions.
    (c) If contracts are priced in foreign currency, agencies must 
ensure that adequate funds are available to cover currency fluctuations 
in order to avoid a violation of the Anti-Deficiency Act.
    4. Section 25.502 is added to read as follows:

25.502  Solicitation provision. -

    The contracting officer shall insert the provision at 52.225-4, 
Evaluation of Foreign Currency Offers, in solicitations if the use of 
other than a specified currency is permitted. The contracting officer 
shall insert the source of the rate to be used in the evaluation of 
offers.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    5. Section 52.225-4 is added to read as follows:

52.225-4  Evaluation of Foreign Currency Offers.

    As prescribed in 25.502, insert the following provision:

EVALUATION OF FOREIGN CURRENCY OFFERS (AUG 1996)

    If offers are received in more than one currency, offers shall 
be evaluated by converting the foreign currency to United States 
currency using (insert source of rate) in effect on the (a) date of 
bid opening for sealed bid acquisitions, (b) closing date for 
negotiated acquisitions when award is based on initial offers, or 
(c) due date for receipt of best and final offers, for other 
acquisitions.

(End of provision)

[FR Doc. 96-14531 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14530 Federal Acquisition Regulation; Caribbean Basin Countries
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31649-31650]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14530]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 25

[FAC 90-39; FAR Case 95-030; Item XV]
RIN 9000-AG96

Federal Acquisition Regulation; Caribbean Basin Countries

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to implement the extension by 
the U.S. Trade Representative of the date of eligibility under the 
Trade Agreements

[[Page 31650]]

Act for products of Caribbean Basin countries. This regulatory action 
was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993, and is not a major 
rule under 5 U.S.C. 804.

EFFECTIVE DATE: September 30, 1995.

FOR FURTHER INFORMATION CONTACT: Mr. Peter O'Such at (202) 501-1759 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 95-030.

SUPPLEMENTARY INFORMATION:

A. Background

    This final rule amends FAR 25.402(b) by changing the date ``1995'' 
to ``1996.'' Products of Caribbean Basin countries were to be treated 
as eligible products until September 30, 1995, unless otherwise 
extended by the U.S. Trade Representative (USTR) by means of a Federal 
Register notice. On October 3, 1995, the USTR published an extension 
through September 30, 1996 (60 FR 51822).

B. Regulatory Flexibility Act

    The final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comments is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected FAR subpart will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAC 90-39, FAR case 95-030), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 25

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 25 is amended as set forth below:

PART 25--FOREIGN ACQUISITION

    1. The authority citation for 48 CFR Part 25 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

Sec. 25.402  [Amended]

    2. Section 25.402 is amended in the first sentence of paragraph (b) 
by removing ``(see 51 FR 6964-6965, February 27, 1986)''; and in the 
second sentence by revising ``1995'' to read ``1996''.
[FR Doc. 96-14530 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14529 Federal Acquisition Regulation; Implementation of the North American Free Trade Agreement Implementation Act
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31646-31649]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14529]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 25, 27, and 52

[FAC 90-39, FAR Case 93-310, Item XIV]
RIN 9000-AF60

Federal Acquisition Regulation; Implementation of the North 
American Free Trade Agreement Implementation Act

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Revised interim rule with request for comment.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to a revised interim rule 
implementing the North American Free Trade Agreement (NAFTA) 
Implementation Act. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993, and is not a major rule under 5 U.S.C. 804.

DATES: Effective Date: June 20, 1996.

    -Comment Date: Comments should be submitted to the FAR Secretariat 
at the address shown below on or before August 19, 1996, to be 
considered in the formulation of a final rule.

ADDRESSES: Interested parties should submit written comments to: -
General Services Administration, FAR Secretariat (MVRS), 18th & F 
Streets, NW., Room 4035, Attn: Ms. Beverly Fayson, Washington, DC 
20405. Please cite FAC 90-39, FAR case 93-310 in all correspondence 
related to this case.

FOR FURTHER INFORMATION CONTACT: Mr. Peter O'Such at (202) 501-1759 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-310.

SUPPLEMENTARY INFORMATION:

A. Background

    While the North American Free Trade Agreement (NAFTA) remains in 
effect, the Canadian Free Trade Agreement (CFTA) is suspended. The CFTA 
interim rule published December 30, 1988 (53 FR 53340, FAC 84-41, FAR 
case 88-070), which revised the FAR coverage

[[Page 31647]]

concerning Canadian products, has been revised and updated by FAR case 
93-310, which implements NAFTA. As a result, FAR case 88-070 was closed 
into FAR case 93-310.
    An interim rule was published January 5, 1994 (59 FR 544, FAC 90-
19, FAR case 93-310), to implement NAFTA. Based on the analysis of 
public comments, the interim rule has been revised to--
    (1) Add language to FAR 25.402 to address the applicability of 
NAFTA to services.
    (2) Implement Article 1709(10) of NAFTA and Section 6 of Executive 
Order 12889 of December 27, 1993. FAR 27.208 is added to make 
contracting personnel aware of the requirements to obtain authorization 
from the owner of technology covered by a valid patent prior to use by 
or for the Federal Government and of waivers permitted under Section 6 
of Executive Order 12889.
    (3) Revise 52.212-3 and 52.212-5 to reflect changes to 52.225-20 
and 52.225-21, accomplished in this revised interim rule.
    (4) Add alternates for the provision at 52.225-20 and the clause at 
52.225-21 for use in procurements between $25,000 and $50,000.
    (5) Add a new clause 52.225-22, ``Balance of Payments Program--
Construction Materials--NAFTA,'' for construction contracts awarded 
outside the United States with an estimated value over $6,500,000.

B. Regulatory Flexibility Act

    The amendments in this revised interim rule are not expected to 
have a significant economic impact on a substantial number of small 
entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 
601 et seq., because (1) the new clause, ``Balance of Payments 
Program--Construction Materials--NAFTA, is only for construction 
contracts awarded outside the United States; (2) the new coverage at 
27.208 pertains only to patents held by parties from NAFTA countries; 
and (3) other changes are primarily for clarification or editorial. An 
Initial Regulatory Flexibility Analysis (IRFA) was prepared and 
provided to the Chief Counsel for Advocacy for the Small Business 
Administration when the interim rule was issued in January 1994. A copy 
of the IRFA may be obtained from the FAR Secretariat. Comments are 
invited. Comments from small entities concerning the affected FAR 
subparts will be considered in accordance with 5 U.S.C. 610. Such 
comments must be submitted separately and cite 5 U.S.C. 601 et seq. 
(FAC 90-39, FAR case 93-310), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of OMB under 44 
U.S.C. 3501 et seq.

D. Determination to Issue an Interim Rule

    A determination has been made under the authority of the Secretary 
of Defense (DOD), the Administrator of General Services (GSA), and the 
Administrator of the National Aeronautics and Space Administration 
(NASA) that compelling reasons exist to promulgate this revised interim 
rule without prior opportunity for public comment. This action is 
necessary because the North American Free Trade Agreement 
Implementation Act, signed into law on December 8, 1993, became 
effective on January 1, 1994, and several substantive changes to the 
existing interim rule are needed to fully implement the Act. However, 
pursuant to Public Law 98-577 and FAR 1.501, public comments received 
in response to this interim rule will be considered in the formation of 
the final rule.

List of Subjects in 48 CFR Parts 25, 27, and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
    Therefore, 48 CFR parts 25, 27, and 52 are amended as set forth 
below:
    1. The authority citation for 48 CFR parts 25, 27, and 52 continues 
to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 25--FOREIGN ACQUISITION

    2. Section 25.305 is amended in the section heading and in the 
heading of paragraph (c) by revising the word ``clause'' to read 
``clauses''; designating the existing paragraph (c) as (c)(1); and 
adding paragraph (c)(2) to read as follows:

25.305   Solicitation provision and contract clauses.

* * * * *
    (c) * * *
    (2) For construction contracts outside the United States, with an 
estimated value of $6,500,000 or more, insert the clause at 52.225-22, 
Balance of Payments Program--Construction Materials-- NAFTA.
    3. Section 25.402 is amended by adding paragraph (g) to read as 
follows:

25.402   Policy.

* * * * *
    (g) The procedures in 25.405 apply to the acquisition of NAFTA 
country services. These are services provided by a firm established in 
a NAFTA country under service contracts with an estimated acquisition 
value of $50,000 or more ($6,500,000 or more for construction), except 
for the following excluded services (Federal Service Code or Category 
from the Federal Procurement Data System Product/Service Code Manual is 
indicated in parentheses):
    (1) Information processing and related telecommunications services 
(D):
    (i) Automated data processing (ADP) telecommunications and 
transmission services (D304).
    (ii) ADP teleprocessing and timesharing services (D305).
    (iii) Telecommunications network management services (D316).
    (iv) Automated news services, data services, or other information 
services (D317).
    (v) Other ADP and telecommunications services (D399).
    (2) Maintenance, repair, modification, rebuilding, and installation 
of equipment (J):
    (i) Maintenance, repair, modification, rebuilding, and installation 
of equipment related to ships (J019).
    (ii) Non-nuclear ship repair (J998).
    (3) Operation of Government-owned facilities (M):
    (i) All facilities operated by the Department of Defense, 
Department of Energy, and the National Aeronautics and Space 
Administration.
    (ii) Research and development facilities (M180).
    (4) Utilities--all classes (S).
    (5) Transportation, travel, and relocation services--all classes 
except V503 travel agent services (V).
    (6) All services purchased in support of military forces overseas.
    (7) Construction dredging services.
    4. Section 25.408 is amended by revising paragraphs (a)(3) and 
(a)(4) to read as follows:

25.408   Solicitation provisions and contract clauses.

    (a) * * *
    (3) The provision at 52.225-20, Buy American Act--North American 
Free Trade Agreement Implementation Act--Balance of Payments Program 
Provision, in solicitations containing the clause at 52.225-21. Use the 
provision with its

[[Page 31648]]

Alternate I if the acquisition value is between $25,000 and $50,000; 
and
    (4) The clause at 52.225-21, Buy American Act--North American Free 
Trade Agreement Implementation Act--Balance of Payments Program, in 
solicitations and contracts for supplies where the contracting officer 
has determined that the acquisition is not subject to the Trade 
Agreements Act but is subject to NAFTA. Use the clause with its 
Alternate I if the acquisition value is between $25,000 and $50,000.
* * * * *

PART 27--PATENTS, DATA, AND COPYRIGHTS

    5. Section 27.208 is added to read as follows:

27.208   Use of patented technology under the North American Free Trade 
Agreement.

    (a) The requirements of this section apply to the use of technology 
covered by a valid patent when the patent holder is from a country that 
is a party to the North American Free Trade Agreement (NAFTA).
    (b) Article 1709(10) of NAFTA generally requires a user of 
technology covered by a valid patent to make a reasonable effort to 
obtain authorization prior to use of the patented technology. However, 
NAFTA provides that this requirement for authorization may be waived in 
situations of national emergency or other circumstances of extreme 
urgency, or public noncommercial use.
    (c) Section 6 of Executive Order 12889 of December 27, 1993, waives 
the requirement to obtain advance authorization for--
    (1) An invention used or manufactured by or for the Federal 
Government, except that the patent owner must be notified whenever the 
agency or its contractor, without making a patent search, knows or has 
demonstrable reasonable grounds to know that an invention described in 
and covered by a valid U.S. patent is or will be used or manufactured 
without a license; and
    (2) The existence of a national emergency or other circumstances of 
extreme urgency, except that the patent owner must be notified as soon 
as it is reasonably practicable to do so.
    (d) Section 6(c) of Executive Order 12889 provides that the notice 
to the patent owner does not constitute an admission of infringement of 
a valid privately owned patent.
    (e) When addressing issues regarding compensation for the use of 
patented technology, Government personnel should be advised that NAFTA 
uses the term ``adequate remuneration.'' Executive Order 12889 equates 
``remuneration'' to ``reasonable and entire compensation'' as used in 
28 U.S.C. 1498, the statute which gives jurisdiction to the U.S. Court 
of Federal Claims to hear patent and copyright cases involving 
infringement by the U.S. Government.
    (f) Depending on agency procedures, either the technical/requiring 
activity or the contracting officer shall ensure compliance with the 
notice requirements of NAFTA Article 1709(10). A contract award should 
not be suspended pending notification to the right holder.
    (g) When questions arise regarding the notice requirements or other 
matters relating to this section, the contracting officer should 
consult with legal counsel.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    6. Section 52.212-3 is amended--
    (a) By revising the date of the provision to read ``(JUN 1996)'';
    (b) Redesignating paragraphs (g)(1) through (g)(4) as (g)(1)(i) 
through (g)(1)(iv) and redesignating paragraph (g) as ``(g)(1)''; 
removing ``(NAFTA)'' each time it appears (twice); and removing the 
word ``Certificate'';
    (c) Revising newly designated paragraphs (g)(1)(i), (g)(1)(iii), 
and (g)(1)(iv); and
    (d) Adding paragraph (g)(2) to read as follows:

52.212-3   Offeror Representations and Certifications--Commercial 
Items.

* * * * *

Offeror Representations and Certifications--Commercial Items (JUN 1996)

* * * * *
    (g)(1) * * *
    (i) Each end product being offered, except those listed in 
paragraph (g)(1)(ii) of this provision, is a domestic end product 
(as defined in the clause entitled ``Buy American Act--North 
American Free Trade Agreement Implementation Act--Balance of 
Payments Program.'' Components of unknown origin have been 
considered to have been mined, produced, or manufactured outside the 
United States.
* * * * *
    (iii) Offers will be evaluated by giving certain preferences to 
domestic end products or NAFTA country end products over other end 
products. In order to obtain these preferences in the evaluation of 
each excluded end product listed in paragraph (g)(1)(ii) of this 
provision, offerors must identify below those excluded end products 
that are NAFTA country end products. Products that are not 
identified below will not be deemed NAFTA country end products.
    The following supplies qualify as ``NAFTA country end products'' 
as that term is defined in the clause entitled ``Buy American Act--
North American Free Trade Agreement Implementation Act--Balance of 
Payments Program:''
----------------------------------------------------------------------
----------------------------------------------------------------------
----------------------------------------------------------------------
(Insert line item numbers)
    (iv) Offers will be evaluated in accordance with Part 25 of the 
Federal Acquisition Regulation. In addition, if this solicitation is 
for supplies for use outside the United States, an evaluation factor 
of 50 percent will be applied to offers of end products that are not 
domestic or NAFTA country end products.
    (2) Alternate I. If Alternate I to the clause at 52.225-21 is 
included in this solicitation, substitute the following paragraph 
(g)(1)(iii) for paragraph (g)(1)(iii) of this provision:
    (g)(1)(iii) Offers will be evaluated by giving certain 
preferences to domestic end products or Canadian end products over 
other end products. In order to obtain these preferences in the 
evaluation of each excluded end product listed in paragraph (b) of 
this provision, offerors must identify below those excluded end 
products that are Canadian end products. Products that are not 
identified below will not be deemed Canadian end products.
    The following supplies qualify as ``Canadian end products'' as 
that term is defined in the clause entitled ``Buy American Act--
North American Free Trade Agreement Implementation Act--Balance of 
Payments Program'':
----------------------------------------------------------------------
(Insert line item numbers)

    7. Section 52.212-5 is amended by revising the date of the clause 
to read ``(JUN 1996)''; paragraph (b)(15) is redesignated as 
(b)(15)(i); and (b)(15)(ii) is added to read as follows:

52.212-5  Contract Terms and Conditions Required To Implement Statutes 
or Executive Orders--Commercial Items.

* * * * *

Contract Terms and Conditions Required to Implement Statutes or 
Executive Orders--Commercial Items (Jun 1996)

* * * * *
    (b) * * *
    ____(15)(ii) Alternate I of 52.225-21.
* * * * *
    8. Section 52.225-20 is amended in the section heading and 
provision heading by revising the word ``Certificate'' to read 
``Provision''; revising the date of the provision to read ``(JUN 
1996)''; revising paragraphs (a), (c), and (d) of the provision; and 
adding Alternate I to read as follows:

52.225-20  Buy American Act--North American Free Trade Agreement 
Implementation Act--Balance of Payments Program Provision.

* * * * *

[[Page 31649]]

Buy American Act--North American Free Trade Agreement Implementation 
Act--Balance of Payments Program Provision (Jun 1996)

    (a) Each end product being offered, except those listed in 
paragraph (b) of this provision, is a domestic end product (as 
defined in the clause entitled ``Buy American Act--North American 
Free Trade Agreement Implementation Act--Balance of Payments 
Program''). Components of unknown origin have been considered to 
have been mined, produced, or manufactured outside the United 
States.
* * * * *
    (c) Offers will be evaluated by giving certain preferences to 
domestic end products or NAFTA country end products over other end 
products. In order to obtain these preferences in the evaluation of 
each excluded end product listed in paragraph (b) of this provision, 
offerors must identify below those excluded end products that are 
NAFTA country end products. Products that are not identified below 
will not be deemed NAFTA country end products.
    The following supplies qualify as ``NAFTA country end products'' 
as that term is defined in the clause entitled ``Buy American Act-- 
North American Free Trade Agreement Implementation Act--Balance of 
Payments Program'':

------------------------------------------------------------------------
             Line item no.----                    Country of origin     
------------------------------------------------------------------------
                                                                        
                                                                        
------------------------------------------------------------------------

(List as necessary)
    (d) Offers will be evaluated in accordance with Part 25 of the 
Federal Acquisition Regulation. In addition, if this solicitation is 
for supplies for use outside the United States, an evaluation factor 
of 50 percent will be applied to offers of end products that are not 
domestic or NAFTA country end products.

(End of provision)
    Alternate I (JUN 1996). As prescribed in 25.408(a)(3), 
substitute the following paragraph (c) for paragraph (c) of the 
basic provision:
    (c) Offers will be evaluated by giving certain preferences to 
domestic end products or Canadian end products over other end 
products. In order to obtain these preferences in the evaluation of 
each excluded end product listed in paragraph (b) of this provision, 
offerors must identify below those excluded end products that are 
Canadian end products. Products that are not identified below will 
not be deemed Canadian end products.
    The following supplies qualify as ``Canadian end products'' as 
that term is defined in the clause entitled ``Buy American Act--
North American Free Trade Agreement Implementation Act--Balance of 
Payments Program'':
----------------------------------------------------------------------
(Insert line item numbers)

    9. Section 52.225-21 is amended by revising the date of the clause 
to read ``(JUN 1996)''; in the fourth sentence of paragraph (c) by 
revising the word ``certifying'' to read ``specifying''; removing 
paragraph (d) of the clause; and by adding Alternate I to read as 
follows:

52.225-21  Buy American Act--North American Free Trade Agreement 
Implementation Act--Balance of Payments Program.

* * * * *

Buy American Act--North American Free Trade Agreement Implementation 
Act--Balance of Payments Program (Jun 1996)

* * * * *
    Alternate I (JUN 1996). As prescribed in 25.408(a)(4), add the 
following definition to paragraph (a) and substitute the following 
paragraph (c) for paragraph (c) of the basic clause:
    Canadian end product means an article that (1) is wholly the 
growth, product, or manufacture of Canada, or (2) in the case of an 
article which consists in whole or in part of materials from another 
country or instrumentality, has been substantially transformed in 
Canada into a new and different article of commerce with a name, 
character, or use distinct from that of the article or articles from 
which it was transformed. The term refers to a product offered for 
purchase under a supply contract, but for purposes of calculating 
the value of the end product includes services (except 
transportation services) incidental to its supply; provided, that 
the value of those incidental services does not exceed that of the 
product itself.
    (c) The Contracting Officer has determined that NAFTA applies to 
this acquisition. Unless otherwise specified, NAFTA applies to all 
items in the schedule. The Contractor agrees to deliver under this 
contract only domestic end products unless, in its offer, it 
specifies delivery of foreign end products in the provision entitled 
``Buy American Act--North American Free Trade Agreement 
Implementation Act--Balance of Payments Program Certificate.'' An 
offer specifying that a Canadian end product will be supplied 
requires the Contractor to supply a Canadian end product or, at the 
Contractor's option, a domestic end product.

    10. Section 52.225-22 is added to read as follows:

52.225-22 Balance of Payments Program--Construction Materials--NAFTA.

    As prescribed in 25.305(c)(2), insert the following clause:
Balance of Payments Program--Construction Materials--NAFTA (Jun 1996)
    (a) Definitions. As used in this clause--
    Components means those articles, materials, and supplies 
incorporated directly into construction materials.
    Construction material means an article, material, or supply 
brought to the construction site for incorporation into the building 
or work. Construction material also includes an item brought to the 
site pre-assembled from articles, materials, or supplies. However, 
emergency life safety systems, such as emergency lighting, fire 
alarm, and audio evacuation systems, which are discrete systems 
incorporated into a public building or work and which are produced 
as a complete system, shall be evaluated as a single and distinct 
construction material regardless of when or how the individual parts 
or components of such systems are delivered to the construction 
site.
    Domestic construction material means (1) an unmanufactured 
construction material mined or produced in the United States, or (2) 
a construction material manufactured in the United States, if the 
cost of its components mined, produced, or manufactured in the 
United States exceeds 50 percent of the cost of all its components. 
Components of foreign origin of the same class or kind as the 
construction materials determined to be unavailable pursuant to 
subparagraph 25.202(a)(3) of the Federal Acquisition Regulation 
shall be treated as domestic.
    NAFTA country construction material means a construction 
material that (1) is wholly the growth, product, or manufacture of a 
NAFTA country, or (2) in the case of a construction material which 
consists in whole or in part of materials from another country or 
instrumentality, has been substantially transformed in a NAFTA 
country into a new and different construction material distinct from 
the materials from which it was transformed.
    North American Free Trade Agreement (NAFTA) country means Canada 
and Mexico.
    (b) The Balance of Payments Program provides that the Government 
give preference to domestic construction material.
    (c) The Contractor agrees that only domestic construction 
material or NAFTA country construction material will be used by the 
Contractor, subcontractors, material men, and suppliers in the 
performance of this contract, except for other foreign construction 
materials, if any, listed in this contract.
(End of clause)

[FR Doc. 96-14529 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14528 Federal Acquisition Regulation; Uruguay Round (1996 Code)
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31646]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14528]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 25 and 52

[FAC 90-39; FAR Case 95-304; Item XIII]
RIN 9000-AG80

Federal Acquisition Regulation; Uruguay Round (1996 Code)

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council are finalizing without further change 
the interim rule on the renegotiated General Agreement on Tariffs and 
Trade (GATT) Government Procurement Agreement (1996 Code) (Uruguay 
Round). This regulatory action was not subject to Office of Management 
and Budget review under Executive Order 12866, dated September 30, 
1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Peter O'Such at (202) 501-1759 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 95-304.

SUPPLEMENTARY INFORMATION:

A. Background

    This rule finalizes without further change the interim rule, 
published in the Federal Register on December 29, 1995 (60 FR 67514), 
which implemented the Uruguay Round Agreement Act, Public Law 103-465. 
No public comments were received in response to the interim rule.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because the rule does not 
impose any new requirements on contractors, large or small. The rule 
primarily changes the list of designated foreign countries and extends 
applicability of the Trade Agreements Act to all agencies for supply 
and construction contracts over certain dollar thresholds. However, 
those contracts which are now subject to the Trade Agreements Act were 
already subject to the Memorandum of Understanding between the United 
States of America and the European Community on Government Procurement. 
This change will have minimal impact on U.S. firms. The rule does not 
diminish existing preferences for small businesses, because purchases 
under small and small disadvantaged business preference programs are 
exempted from the Trade Agreements Act.

C. Paperwork Reduction Act

    The final rule does not impose any new reporting or recordkeeping 
requirements which require OMB approval under 44 U.S.C. 3501, et seq. 
Contractors, which previously were required to respond to the now 
deleted provision at 52.225-16, Buy American Act--Supplies under 
European Community Agreement Certificate, will now be required to 
respond to the comparable provision at 52.225-8, Buy American Act--
Trade Agreements--Balance of Payments Program Certificate (OMB Control 
No. 9000-0046).

List of Subjects in 48 CFR Parts 25 and 52

    Government procurement.

Interim Rule Adopted as Final

    Accordingly, the interim rule amending 48 CFR Parts 25 and 52, 
which was published at 60 FR 67514, December 29, 1995, is adopted as 
final without further change.
    The authority citation for 48 CFR Parts 25 and 52 continues to read 
as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14528 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14527 Federal Acquisition Regulation; Ozone Executive Order
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31644-31646]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14527]

-----------------------------------------------------------------------

[[Page 31645]]

DEPARTMENT OF DEFENSE
48 CFR Parts 23 and 52

[FAC 90-39; FAR Case 93-307; Item XII]
RIN 9000-AG42

Federal Acquisition Regulation; Ozone Executive Order

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final with changes.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to convert the interim rule 
published at 60 FR 28500, May 31, 1995, to a final rule with changes to 
amend the Federal Acquisition Regulation (FAR) to provide policy for 
the acquisition of items that contain or are manufactured with ozone-
depleting substances. This regulatory action was not subject to Office 
of Management and Budget review under Executive Order 12866, dated 
September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Ralph De Stefano at (202) 501-1758 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-307.

SUPPLEMENTARY INFORMATION:

A. Background

    The Environmental Protection Agency (EPA) promulgated 40 CFR Part 
82, Subpart D, to satisfy EPA's obligation under Section 613, Title VI 
of the Clean Air Act Amendments of 1990. The EPA rule requires each 
department, agency, and instrumentality of the United States to conform 
its procurement regulations to the policies and requirements of Title 
VI of the Clean Air Act and to maximize the substitution of safe 
alternatives for ozone-depleting substances as identified under Section 
612 of the Act. The EPA rule complements Executive Order 12843, 
Procurement Requirements and Policies for Federal Agencies for Ozone-
Depleting Substances (58 FR 21881, April 23, 1993). Both the Executive 
Order and the EPA rule require that new contracts provide that any 
acquired products which contain or are manufactured with ozone-
depleting substances be labeled in the manner and to the extent 
required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, 
Subpart E. On May 31, 1995 (60 FR 28500), the Civilian Agency 
Acquisition Council and the Defense Acquisition Regulations Council 
published an interim rule to implement the EPA regulations and the 
Executive Order.
    This final FAR rule contains revisions resulting from public 
comments received in response to the interim rule. Several respondents 
questioned whether the interim rule went beyond the labeling 
requirements in Section 611 of the 1990 amendments to the Clean Air Act 
(42 U.S.C. 7671j) and its implementing EPA regulations at 40 CFR. This 
confusion has been resolved by replacing the definitions of ``Class I 
substance'' and ``Class II substance'' with a definition of ``ozone-
depleting substance'', and by revising the clause at 52.223-11 to 
clarify that labeling shall be in accordance with 42 U.S.C. 7671j and 
40 CFR Part 82. The intent of the rule is to stay within the bounds of 
the Clean Air Act and the EPA regulations.

B. Regulatory Flexibility Act

    The Regulatory Flexibility Act, 5 U.S.C. 601, et seq., applies to 
this final rule and a Final Regulatory Flexibility Analysis has been 
performed. A copy of the analysis may be obtained from the FAR 
Secretariat.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 23 and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

Interim Rule Adopted as Final With Changes

    Accordingly, the interim rule amending 48 CFR Parts 23 and 52 which 
was published at 60 FR 28500, May 31, 1995, is adopted as final with 
changes as set forth below:
    1. The authority citation for 48 CFR Parts 23 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 23--ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-
FREE WORKPLACE

23.800  [Amended]

    2. Section 23.800 is amended by removing the last sentence.
    3. Section 23.802 is revised to read as follows:

23.802  Definition.

    Ozone-depleting substance means--
    (a) Any substance designated as Class I by EPA (40 CFR part 82), 
including but not limited to chlorofluorocarbons, halons, carbon 
tetrachloride, and methyl chloroform; or
    (b) Any substance designated as Class II by EPA (40 CFR part 82), 
including but not limited to hydrochlorofluorocarbons.

23.803  [Amended]

    4. Section 23.803 is amended in paragraph (b)(2) by removing the 
period and inserting ``, except in the case of Class I substances being 
used for specified essential uses, as identified under 40 CFR 
82.4(r).''
    5. Section 23.804 is revised to read as follows:

23.804  Contract clauses.

    Except for contracts to be performed outside the United States, its 
possessions, and Puerto Rico, the contracting officer shall insert the 
clause at:
    (a) 52.223-11, Ozone-Depleting Substances, in solicitations and 
contracts for ozone-depleting substances or for supplies that may 
contain or be manufactured with ozone-depleting substances.
    (b) 52.223-12, Refrigeration Equipment and Air Conditioners, in 
solicitations and contracts for services when the contract includes the 
maintenance, repair, or disposal of any equipment or appliance using 
ozone-depleting substances as a refrigerant, such as air conditioners, 
including motor vehicles, refrigerators, chillers, or freezers.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    6. Section 52.223-11 is revised to read as follows:

52.223-11  Ozone-Depleting Substances.

    -As prescribed in 23.804(a), insert the following clause:

Ozone-Depleting Substances (Jun 1996)

    -(a) Definitions. Ozone-depleting substance, as used in this 
clause, means any substance designated as Class I by the 
Environmental Protection Agency (EPA) (40 CFR Part 82),

[[Page 31646]]

including but not limited to chlorofluorocarbons, halons, carbon 
tetrachloride, and methyl chloroform; or any substance designated as 
Class II by EPA (40 CFR Part 82), including but not limited to 
hydrochlorofluorocarbons.
    (b) The Contractor shall label products which contain or are 
manufactured with ozone-depleting substances in the manner and to 
the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR 
Part 82, Subpart E, as follows:
    ``WARNING: Contains (or manufactured with, if applicable)
*, a substance(s) which harm(s) public health and environment by 
destroying ozone in the upper atmosphere.''----------------------------
    * The Contractor shall insert the name of the substance(s).

(End of clause)

[FR Doc. 96-14527 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14526 Federal Acquisition Regulation; Use of Convict Labor
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31643-31644]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14526]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 22 and 52

[FAC 90-39; FAR Case 93-615; Item XI]
RIN 9000-AG02

Federal Acquisition Regulation; Use of Convict Labor

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to reflect changes in the 
statutory restrictions on employment of convict labor in the 
performance of Government contracts. This regulatory action was not 
subject to Office of Management and Budget review under Executive Order 
12866, dated September 30, 1993, and is not a major rule under 5 U.S.C. 
804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building,

[[Page 31644]]

Washington, DC 20405 (202) 501-4755. Please cite FAC 90-39, FAR case 
93-615.

SUPPLEMENTARY INFORMATION:

A. Background

    A proposed rule was published in the Federal Register on September 
6, 1994 (59 FR 46020). The proposed rule amended FAR Subpart 22.2 and 
the clause at 52.222-3 to (1) remove all references to 18 U.S.C. 
4082(c)(2), which now only applies to offenses committed prior to 
November 1, 1987; (2) reflect the addition of the Commonwealth of the 
Northern Mariana Islands to the jurisdictions covered by Executive 
Order 11755; and (3) include further information regarding the 
requirements of Executive Order 11755, as amended by Executive Order 
12608.
    No substantive comments were received on the proposed rule during 
the public comment period. The Councils, therefore, agreed to adopt the 
proposed rule as a final rule without change.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because it merely updates FAR 
language pertaining to the employment of convict labor to conform to 
current statutory requirements. No comments were received on the impact 
of this rule on small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 22 and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Parts 22 and 52 are amended as set forth below:
    1. The authority citation for 48 CFR Parts 22 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 22--APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS

    2. Section 22.201 is revised to read as follows:

Sec. 22.201   General.

    (a) Executive Order 11755, December 29, 1973, as amended by 
Executive Order 12608, September 9, 1987, and Executive Order 12943, 
December 13, 1994, states: ``The development of the occupational and 
educational skills of prison inmates is essential to their 
rehabilitation and to their ability to make an effective return to free 
society. Meaningful employment serves to develop those skills. It is 
also true, however, that care must be exercised to avoid either the 
exploitation of convict labor or any unfair competition between convict 
labor and free labor in the production of goods and services.'' The 
Executive order does not prohibit the contractor, in performing the 
contract, from employing--
    (1) Persons on parole or probation;
    (2) Persons who have been pardoned or who have served their terms;
    (3) Federal prisoners; or
    (4) Nonfederal prisoners authorized to work at paid employment in 
the community under the laws of a jurisdiction listed in the Executive 
order if--
    (i) The worker is paid or is in an approved work training program 
on a voluntary basis;
    (ii) Representatives of local union central bodies or similar labor 
union organizations have been consulted;
    (iii) Paid employment will not--
    (A) Result in the displacement of employed workers;
    (B) Be applied in skills, crafts, or trades in which there is a 
surplus of available gainful labor in the locality; or
    (C) Impair existing contracts for services;
    (iv) The rates of pay and other conditions of employment will not 
be less than those for work of a similar nature in the locality where 
the work is being performed; and
    (v) The Attorney General of the United States has certified that 
the work-release laws or regulations of the jurisdiction involved are 
in conformity with the requirements of Executive Order 11755, as 
amended.
    (b) Department of Justice regulations authorize the Director of the 
Bureau of Justice Assistance to exercise the power and authority vested 
in the Attorney General by the Executive order to certify and to revoke 
the certification of work-release laws or regulations (see 28 CFR 0.94-
1(b)).

22.202   [Amended]

    3. Section 22.202 is amended in the introductory paragraph by 
inserting after ``Samoa,'' ``the Commonwealth of the Northern Mariana 
Islands,''.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    4. Section 52.222-3 is revised to read as follows:

52.222-3   Convict labor.

    As prescribed in 22.202, insert the following clause:

Convict Labor (Aug 1996)

    The Contractor agrees not to employ in the performance of this 
contract any person undergoing a sentence of imprisonment which has 
been imposed by any court of a State, the District of Columbia, the 
Commonwealth of Puerto Rico, the Virgin Islands, Guam, American 
Samoa, the Commonwealth of the Northern Mariana Islands, or the 
Trust Territory of the Pacific Islands. This limitation, however, 
shall not prohibit the employment by the Contractor in the 
performance of this contract of persons on parole or probation to 
work at paid employment during the term of their sentence or persons 
who have been pardoned or who have served their terms. Nor shall it 
prohibit the employment by the Contractor in the performance of this 
contract of persons confined for violation of the laws of any of the 
States, the District of Columbia, the Commonwealth of Puerto Rico, 
the Virgin Islands, Guam, American Samoa, the Commonwealth of the 
Northern Mariana Islands, or the Trust Territory of the Pacific 
Islands who are authorized to work at paid employment in the 
community under the laws of such jurisdiction, if--
    (a)(1) The worker is paid or is in an approved work training 
program on a voluntary basis;
    (2) Representatives of local union central bodies or similar 
labor union organizations have been consulted;
    (3) Such paid employment will not result in the displacement of 
employed workers, or be applied in skills, crafts, or trades in 
which there is a surplus of available gainful labor in the locality, 
or impair existing contracts for services; and
    (4) The rates of pay and other conditions of employment will not 
be less than those paid or provided for work of a similar nature in 
the locality in which the work is being performed; and
    (b) The Attorney General of the United States has certified that 
the work-release laws or regulations of the jurisdiction involved 
are in conformity with the requirements of Executive Order 11755, as 
amended by Executive Orders 12608 and 12943.

(End of clause)

[FR Doc. 96-14526 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14525 Federal Acquisition Regulation; Small Business Competitiveness Demonstration Program
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31643]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14525]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 19

[FAC 90-39; FAR Case 92-302; Item X]
RIN 9000-AG10

Federal Acquisition Regulation; Small Business Competitiveness 
Demonstration Program

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to finalize without change 
the interim rule which was published at 59 FR 67036, December 28, 1994 
(FAC 90-23, Item XIII), amending the Federal Acquisition Regulation 
(FAR) Part 19 to (1) extend the Small Business Competitiveness 
Demonstration Program through September 30, 1996; (2) specify that 
agencies may reinstate the use of small business set-asides as 
necessary to meet assigned goals, but only within the organizational 
unit(s) that failed to meet the small business goals; and (3) revise 
the description of Architectual and Engineering services as a 
designated industry group. This regulatory action was not subject to 
Office of Management and Budget review under Executive Order 12866, 
dated September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-302.

SUPPLEMENTARY INFORMATION:

A. Background

    This rule finalizes the interim rule, which implements Title II of 
Public Law 102-366, the Small Business Credit and Business Opportunity 
Enhancement Act of 1992, which revised Title VII of Public Law 100-656, 
Small Business Competitiveness Demonstration Program. The Office of 
Federal Procurement Policy published an interim policy directive in the 
Federal Register at 58 FR 19849, April 16, 1993, revising the current 
directive dated August 31, 1989, to include revisions based on Title 
II.
    On December 28, 1994, the interim rule was published in the Federal 
Register with a request for comment. Two responses were received. No 
changes were made to the interim rule as a result of the responses. The 
interim rule has been adopted as a final rule without change.

B. Regulatory Flexibility Act

    The final rule implements statutory revisions included in the 
revisions to the OFPP policy directive. OFPP prepared the appropriate 
regulatory flexibility statements as part of the revisions to the OFPP 
policy directive published in the Federal Register.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 19

    Government procurement.

Interim Rule Adopted as Final Without Change

    Accordingly, the interim rule amending 48 CFR Part 19, which was 
published at 59 FR 67036, December 28, 1994 (FAC 90-23, Item XIII), is 
adopted as a final rule without change.
    The authority citation for 48 CFR Part 19 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14525 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14524 Federal Acquisition Regulation; Master Subcontracting Plans
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31642-31643]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14524]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 19 and 52

[FAC 90-39; FAR Case 92-039; Item IX]
RIN 9000-AG07

Federal Acquisition Regulation; Master Subcontracting Plans

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to permit master 
subcontracting plans to be written for a three-year period and to 
emphasize that it is incumbent upon contractors to maintain and update 
master plans. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-039.

SUPPLEMENTARY INFORMATION:

A. Background

    A proposed rule was published in the Federal Register on September 
8, 1994 (59 FR 46385). The proposed rule amended FAR 19.704(b) and 
52.219-9 to permit master subcontracting plans to be written for a 
three-year period with contractors making changes/updates to master 
subcontracting plans as necessary. After evaluating public comments, 
the Councils have agreed to add language at FAR 19.704(b) stating that 
changes required to update master subcontracting plans are not 
effective until approved by the contracting officer.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities within the meaning of the Regulatory 
Flexibility Act, 5 U.S.C. 601, et seq., because small businesses are 
exempt from subcontracting plan requirements, and the rule does not 
change the contractor's obligation to maximize subcontracting 
opportunities for small business concerns. No comments were received on 
the impact of this rule on small entities during the public comment 
period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act of 1995 (Public Law 104-13) is deemed 
to apply because the final rule contains information collection 
requirements. This final rule will result in an estimated reduction in 
the number of subcontract plans per year and associated hours. 
Consequently, a revised clearance for OMB Control Number 9000-0006 was 
submitted to OMB. The revised clearance has been approved through 
October 31, 1997. OMB Control Number 9000-0006 has recently been 
further revised by FAR case 94-780, and approval has been extended 
through March 31, 1998.

List of Subjects in 48 CFR Parts 19 and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Parts 19 and 52 are amended as set forth below:

[[Page 31643]]

    1. The authority citation for 48 CFR Parts 19 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 19--SMALL BUSINESS PROGRAMS

    2. Section 19.704 is amended in paragraph (b) by revising the 
second sentence and adding a third and fourth sentence to read as 
follows:

19.704   Subcontracting plan requirements.

* * * * *
    (b) * * * Master plans shall be effective for a 3-year period after 
approval by the contracting officer; however, it is incumbent upon 
contractors to maintain and update master plans. Changes required to 
update master plans are not effective until approved by the contracting 
officer. A master plan, when incorporated in an individual plan, shall 
apply to that contract throughout the life of the contract.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    3. Section 52.219-9 is amended by revising the date of the clause 
to read ``(AUG 1996)''; in paragraph (f) introductory text by removing 
``(d) above,'' and inserting ``paragraph (d) of this clause,'' in its 
place; and revising paragraph (f)(2) of the clause to read as follows:

52.219-9   Small, Small Disadvantaged and Women-Owned Small Business 
Subcontracting Plan.

* * * * *

Small, Small Disadvantaged and Women-Owned Small Business 
Subcontracting Plan (Aug 1996)

* * * * *
    (f) * * *
    (2) the offeror ensures that the master plan is updated as 
necessary and provides copies of the approved master plan, including 
evidence of its approval, to the Contracting Officer, and
* * * * *
[FR Doc. 96-14524 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14523 Federal Acquisition Regulation; Small Business Size Standards
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31622-31642]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14523]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 19

[FAC 90-39; FAR Case 94-600; Item VIII]

Federal Acquisition Regulation; Small Business Size Standards

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: Amendments in this document will bring the Federal Acquisition 
Regulation into conformance with revised small business size standards 
published by the Small Business Administration (SBA). This regulatory 
action was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993, and is not a major 
rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Ms. Linda Klein at (202) 501-3775. For 
general information, contact the FAR Secretariat, Room 4037, GS 
Building, Washington, DC 20405, (202) 501-4755. Please cite FAC 90-39 
(FAR case 94-600).

SUPPLEMENTARY INFORMATION:

A. Background

    SBA has revised its size standards regulations at 13 CFR Part 121 
(61 FR 3280, January 31, 1996), effective March 1, 1996. Corrections 
were published (61 FR 6412, February 20, 1996; 61 FR 7306, February 27, 
1996; and 61 FR 7986, March 1, 1996). As a result, the table of Size 
Standards shown in the FAR at 19.102 has been revised to reflect the 
changes made by SBA through March 1996.
    SBA currently has two size standards publications available via the 
Internet on SBA ONLINE. They are the table of Size Standards, which 
currently appears in the FAR, and a copy of 13 CFR 121, the Size 
Regulations, published in the Federal Register on January 31, 1996.

B. Regulatory Flexibility Act

    These changes derive directly from SBAs regulations, without 
substantive change. Therefore, the final rule does not constitute a 
significant FAR revision within the meaning of FAR 1.501 and Public Law 
98-577, and publication for public comments is not required. The 
Regulatory Flexibility Act does not apply. However, comments from small 
entities concerning the affected subpart will be considered in 
accordance with 5 U.S.C. 610. Such comments must be submitted 
separately and cite 5 U.S.C. 601, et seq. (FAC 90-39, FAR case 94-600), 
in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 19

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 19 is amended as set forth below:

PART 19--SMALL BUSINESS PROGRAMS

    1. The authority citation for 48 CFR Part 19 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 19.102 is amended by revising the table consisting of 
industry size standards and revising the footnotes to read as follows:

19.102  Size standards.

* * * * *

[[Page 31623]]

                                       Size Standards by SIC Industry 3/96                                      
----------------------------------------------------------------------------------------------------------------
                                       Description  (N.E.C. = Not elsewhere       Size standards in number of   
                 SIC                                classified)                employees or millions of dollars 
----------------------------------------------------------------------------------------------------------------
                                              See Footnotes on Menu                                             
                                  Division A--Agriculture, Forestry and Fishing                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                 Major Group 01--Agricultural Production--Crops                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
0111................................  Wheat.................................  $0.5                              
0112................................  Rice..................................  $0.5                              
0115................................  Corn..................................  $0.5                              
0116................................  Soybeans..............................  $0.5                              
0119................................  Cash Grains, N.E.C....................  $0.5                              
0131................................  Cotton................................  $0.5                              
0132................................  Tobacco...............................  $0.5                              
0133................................  Sugarcane and Sugar Beets.............  $0.5                              
0134................................  Irish Potatoes........................  $0.5                              
0139................................  Field Crops, Except Cash Grains,        $0.5                              
                                       N.E.C..                                                                  
0161................................  Vegetables and Melons.................  $0.5                              
0171................................  Berry Crops...........................  $0.5                              
0172................................  Grapes................................  $0.5                              
0173................................  Tree Nuts.............................  $0.5                              
0174................................  Citrus Fruits.........................  $0.5                              
0175................................  Deciduous Tree Fruits.................  $0.5                              
0179................................  Fruits and Tree Nuts, N.E.C...........  $0.5                              
0181................................  Ornamental Floriculture Nursery         $0.5                              
                                       Products.                                                                
0182................................  Food Crops Grown Under Cover..........  $0.5                              
0191................................  General Farms, Primarily Crop.........  $0.5                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                Major Group 02--Livestock and Animal Specialties                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
0211................................  Beef Cattle Feedlots (Custom).........  $1.5                              
0212................................  Beef Cattle, Except Feedlots..........  $0.5                              
0213................................  Hogs..................................  $0.5                              
0214................................  Sheep and Goats.......................  $0.5                              
0219................................  General Livestock, Except Dairy and     $0.5                              
                                       Poultry.                                                                 
0241................................  Dairy Farms...........................  $0.5                              
0251................................  Broiler, Fryer, and Roaster Chickens..  $0.5                              
0252................................  Chicken Eggs..........................  $9.0                              
0253................................  Turkeys and Turkey Eggs...............  $0.5                              
0254................................  Poultry Hatcheries....................  $0.5                              
0259................................  Poultry and Eggs, N.E.C...............  $0.5                              
0271................................  Fur-Bearing Animals and Rabbits.......  $0.5                              
0272................................  Horses and Other Equines..............  $0.5                              
0273................................  Animal Aquaculture....................  $0.5                              
0279................................  Animal Specialties, N.E.C.............  $0.5                              
0291................................  General Farms, Primarily Livestock and  $0.5                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Animal Specialties                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                      Major Group 07--Agricultural Services                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
0711................................  Soil Preparation Services.............  $5.0                              
0721................................  Crop Planting, Cultivating, and         $5.0                              
                                       Protecting.                                                              
0722................................  Crop Harvesting, Primarily by Machine.  $5.0                              
0723................................  Crop Preparation Service for Market,    $5.0                              
                                       Except Cotton Ginning.                                                   
0724................................  Cotton Ginning........................  $5.0                              
0741................................  Veterinary Services for Livestock.....  $5.0                              
0742................................  Veterinary Services for Animal          $5.0                              
                                       Specialties.                                                             
0751................................  Livestock Services, Except Veterinary.  $5.0                              
0752................................  Animal Specialty Services, Except       $5.0                              
                                       Veterinary.                                                              
0761................................  Farm Labor Contractors and Crew         $5.0                              
                                       Leaders.                                                                 
0762................................  Farm Management Services..............  $5.0                              
0781................................  Landscape Counseling and Planning.....  $5.0                              
0782................................  Lawn and Garden Services..............  $5.0                              
0783................................  Ornamental Shrub and Tree Services....  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                             Major Group 08--Forestry                                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
0811................................  Timber Tracts.........................  $5.0                              
0831................................  Forest Nurseries and Gathering of       $5.0                              
                                       Forest Products.                                                         

[[Page 31624]]

                                                                                                                
0851................................  Forestry Services.....................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                  Major Group 09--Fishing, Hunting, and Trapping                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
0912................................  Finfish...............................  $3.0                              
0913................................  Shellfish.............................  $3.0                              
0919................................  Miscellaneous Marine Products.........  $3.0                              
0921................................  Fish Hatcheries and Preserves.........  $3.0                              
0971................................  Hunting and Trapping, and Game          $3.0                              
                                       Propagation.                                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                                Division B--Mining                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                           Major Group 10--Metal Mining                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1011................................  Iron Ores.............................  500                               
1021................................  Copper Ores...........................  500                               
1031................................  Lead and Zinc Ores....................  500                               
1041................................  Gold Ores.............................  500                               
1044................................  Silver Ores...........................  500                               
1061................................  Ferroalloy Ores, Except Vanadium......  500                               
1081................................  Metal Mining Services.................  $5.0                              
1094................................  Uranium-Radium-Vanadium Ores..........  500                               
1099................................  Miscellaneous Metal Ores, N.E.C.......  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                           Major Group 12--Coal Mining                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1221................................  Bituminous Coal and Lignite Surface     500                               
                                       Mining.                                                                  
1222................................  Bituminous Coal Underground Mining....  500                               
1231................................  Anthracite Mining.....................  500                               
1241................................  Coal Mining Services..................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                     Major Group 13--Oil and Gas Extraction                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1311................................  Crude Petroleum and Natural Gas.......  500                               
1321................................  Natural Gas Liquids...................  500                               
1381................................  Drilling Oil and Gas Wells............  500                               
1382................................  Oil and Gas Field Exploration Services  $5.0                              
1389................................  Oil and Gas Field Services, N.E.C.....  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                   Major Group 14--Mining and Quarrying of Nonmetallic Minerals, Except Fuels                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1411................................  Dimension Stone.......................  500                               
1422................................  Crushed and Broken Limestone..........  500                               
1423................................  Crushed and Broken Granite............  500                               
1429................................  Crushed and Broken Stone, N.E.C.......  500                               
1442................................  Construction Sand and Gravel..........  500                               
1446................................  Industrial Sand.......................  500                               
1455................................  Kaolin and Ball Clay..................  500                               
1459................................  Clay, Ceramic, and Refractory           500                               
                                       Minerals, N.E.C..                                                        
1474................................  Potash, Soda, and Borate Minerals.....  500                               
1475................................  Phosphate Rock........................  500                               
1479................................  Chemical and Fertilizer Mineral         500                               
                                       Mining, N.E.C.                                                           
1481................................  Nonmetallic Minerals Services, Except   $5.0                              
                                       Fuels.                                                                   
1499................................  Miscellaneous Nonmetallic Minerals,     500                               
                                       Except Fuels.                                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                            Division C--Construction                                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                Major Group 15--Building Construction--General Contractors and Operative Builders               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1521................................  General Contractors--Single-Family      $17.0                             
                                       Houses.                                                                  
1522................................  General Contractors--Residential        $17.0                             
                                       Buildings, Other Than Single-Family.                                     
1531................................  Operative Builders....................  $17.0                             
1541................................  General Contractors--Industrial         $17.0                             
                                       Buildings and Warehouses.                                                
1542................................  General Contractors--Nonresidential     $17.0                             
                                       Buildings, Other Than Industrial                                         
                                       Buildings and Warehouses.                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 31625]]

                                                                                                                
                Major Group 16--Heavy Construction Other Than Building Construction--Contractors                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1611................................  Highway and Street Construction,        $17.0                             
                                       Except Elevated Highways.                                                
1622................................  Bridge, Tunnel, and Elevated Highway    $17.0                             
                                       Construction..                                                           
1623................................  Water, Sewer, Pipeline, and             $17.0                             
                                       Communications and Power Line                                            
                                       Construction.                                                            
1629................................  Heavy Construction, N.E.C.............  $17.0                             
Except,.............................  Dredging and Surface Cleanup            $13.5 \1\                         
                                       Activities.                                                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                            Major Group 17--Construction--Special Trade Contractors                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
1711................................  Plumbing, Heating, and Air-             $7.0                              
                                       Conditioning.                                                            
1721................................  Painting and Paper Hanging............  $7.0                              
1731................................  Electrical Work.......................  $7.0                              
1741................................  Masonry, Stone Setting, and Other       $7.0                              
                                       Stone Work.                                                              
1742................................  Plastering, Drywall, Acoustical and     $7.0                              
                                       Insulation Work.                                                         
1743................................  Terrazzo, Tile, Marble, and Mosaic      $7.0                              
                                       Work.                                                                    
1751................................  Carpentry Work........................  $7.0                              
1752................................  Floor Laying and Other Floor Work,      $7.0                              
                                       N.E.C..                                                                  
1761................................  Roofing, Siding, and Sheet Metal Work.  $7.0                              
1771................................  Concrete Work.........................  $7.0                              
1781................................  Water Well Drilling...................  $7.0                              
1791................................  Structural Steel Erection.............  $7.0                              
1793................................  Glass and Glazing Work................  $7.0                              
1794................................  Excavation Work.......................  $7.0                              
1795................................  Wrecking and Demolition Work..........  $7.0                              
1796................................  Installation or Erection of Building    $7.0                              
                                       Equipment, N.E.C..                                                       
1799................................  Special Trade Contractors, N.E.C......  $7.0                              
Except,.............................  Base Housing Maintenance..............  $7.0 \12\                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Division D--Manufacturing \2\                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 20--Food and Kindred Products                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2011................................  Meat Packing Plants...................  500                               
2013................................  Sausages and Other Prepared Meat        500                               
                                       Products.                                                                
2015................................  Poultry Slaughtering and Processing...  500                               
2021................................  Creamery Butter.......................  500                               
2022................................  Natural, Processed, and Imitation       500                               
                                       Cheese.                                                                  
2023................................  Dry, Condensed, and Evaporated Dairy    500                               
                                       Products.                                                                
2024................................  Ice Cream and Frozen Desserts.........  500                               
2026................................  Fluid Milk............................  500                               
2032................................  Canned Specialties....................  1,000                             
2033................................  Canned Fruits, Vegetables, Preserves,   500 \3\                           
                                       Jams, and Jellies.                                                       
2034................................  Dried and Dehydrated Fruits,            500                               
                                       Vegetables, and Soup Mixes.                                              
2035................................  Pickled Fruits and Vegetables,          500                               
                                       Vegetable Sauces and Seasonings, and                                     
                                       Salad Dressings.                                                         
2037................................  Frozen Fruits, Fruit Juices, and        500                               
                                       Vegetables.                                                              
2038................................  Frozen Specialties, N.E.C.............  500                               
2041................................  Flour and Other Grain Mill Products...  500                               
2043................................  Cereal Breakfast Foods................  1,000                             
2044................................  Rice Milling..........................  500                               
2045................................  Prepared Flour Mixes and Doughs.......  500                               
2046................................  Wet Corn Milling......................  750                               
2047................................  Dog and Cat Food......................  500                               
2048................................  Prepared Feeds and Feed Ingredients     500                               
                                       for Animals and Fowls, Except Dogs                                       
                                       and Cats.                                                                
2051................................  Bread and Other Bakery Products,        500                               
                                       Except Cookies and Crackers.                                             
2052................................  Cookies and Crackers..................  750                               
2053................................  Frozen Bakery Products, Except Bread..  500                               
2061................................  Cane Sugar, Except Refining...........  500                               
2062................................  Cane Sugar Refining...................  750                               
2063................................  Beet Sugar............................  750                               
2064................................  Candy and Other Confectionery Products  500                               
2066................................  Chocolate and Cocoa Products..........  500                               
2067................................  Chewing Gum...........................  500                               
2068................................  Salted and Roasted Nuts and Seeds.....  500                               
2074................................  Cottonseed Oil Mills..................  500                               
2075................................  Soybean Oil Mills.....................  500                               
2076................................  Vegetable Oil Mills, Except Corn,       1,000                             
                                       Cottonseed, and Soybean.                                                 
2077................................  Animal and Marine Fats and Oils.......  500                               
2079................................  Shortening, Table Oils, Margarine, and  750                               
                                       Other Edible Fats and Oils, N.E.C.                                       

[[Page 31626]]

                                                                                                                
2082................................  Malt Beverages........................  500                               
2083................................  Malt..................................  500                               
2084................................  Wines, Brandy, and Brandy Spirits.....  500                               
2085................................  Distilled and Blended Liquors.........  750                               
2086................................  Bottled and Canned Soft Drinks and      500                               
                                       Carbonated Waters.                                                       
2087................................  Flavoring Extracts and Flavoring        500                               
                                       Syrups, N.E.C.                                                           
2091................................  Canned and Cured Fish and Seafoods....  500                               
2092................................  Prepared Fresh or Frozen Fish and       500                               
                                       Seafoods.                                                                
2095................................  Roasted Coffee........................  500                               
2096................................  Potato Chips, Corn Chips, and Similar   500                               
                                       Snacks.                                                                  
2097................................  Manufactured Ice......................  500                               
2098................................  Macaroni, Spaghetti, Vermicelli, and    500                               
                                       Noodles.                                                                 
2099................................  Food Preparations, N.E.C..............  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                        Major Group 21--Tobacco Products                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2111................................  Cigarettes............................  1,000                             
2121................................  Cigars................................  500                               
2131................................  Chewing and Smoking Tobacco and Snuff.  500                               
2141................................  Tobacco Stemming and Redrying.........  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                     Major Group 22--Textile Mill Products                                      
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2211................................  Broadwoven Fabric Mills, Cotton.......  1,000                             
2221................................  Broadwoven Fabric Mills, Manmade Fiber  500                               
                                       and Silk.                                                                
2231................................  Broadwoven Fabric Mills, Wool           500                               
                                       (Including Dyeing and Finishing).                                        
2241................................  Narrow Fabric and Other Smallwares      500                               
                                       Mills: Cotton, Wool, Silk and Manmade                                    
                                       Fiber.                                                                   
2251................................  Women's Full-Length and Knee-Length     500                               
                                       Hosiery, Except Socks.                                                   
2252................................  Hosiery, N.E.C........................  500                               
2253................................  Knit Outerwear Mills..................  500                               
2254................................  Knit Underwear and Nightwear Mills....  500                               
2257................................  Weft Knit Fabric Mills................  500                               
2258................................  Lace and Warp Knit Fabric Mills.......  500                               
2259................................  Knitting Mills, N.E.C.................  500                               
2261................................  Finishers of Broadwoven Fabrics of      1,000                             
                                       Cotton.                                                                  
2262................................  Finishers of Broadwoven Fabrics of      500                               
                                       Manmade Fiber and Silk.                                                  
2269................................  Finishers of Textiles, N.E.C..........  500                               
2273................................  Carpets and Rugs......................  500                               
2281................................  Yarn Spinning Mills...................  500                               
2282................................  Yarn Texturizing, Throwing, Twisting,   500                               
                                       and Winding Mills.                                                       
2284................................  Thread Mills..........................  500                               
2295................................  Coated Fabrics, Not Rubberized........  1,000                             
2296................................  Tire Cord and Fabrics.................  1,000                             
2297................................  Nonwoven Fabrics......................  500                               
2298................................  Cordage and Twine.....................  500                               
2299................................  Textile Goods, N.E.C..................  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
          Major Group 23--Apparel and Other Finished Products Made From Fabrics and Similar Materials           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2311................................  Men's and Boys' Suits, Coats and        500                               
                                       Overcoats.                                                               
2321................................  Men's and Boys' Shirts, Except Work     500                               
                                       Shirts.                                                                  
2322................................  Men's and Boys' Underwear and           500                               
                                       Nightwear.                                                               
2323................................  Men's and Boys' Neckwear..............  500                               
2325................................  Men's and Boys' Separate Trousers and   500                               
                                       Slacks.                                                                  
2326................................  Men's and Boys' Work Clothing.........  500                               
2329................................  Men's and Boys' Clothing, N.E.C.......  500                               
2331................................  Women's, Misses', and Juniors' Blouses  500                               
                                       and Shirts.                                                              
2335................................  Women's, Misses', and Juniors' Dresses  500                               
2337................................  Women's, Misses', and Juniors' Suits,   500                               
                                       Skirts, and Coats.                                                       
2339................................  Women's, Misses', and Juniors'          500                               
                                       Outerwear, N.E.C.                                                        
2341................................  Women's, Misses', Children's, and       500                               
                                       Infants' Underwear and Nightwear.                                        
2342................................  Brassieres, Girdles, and Allied         500                               
                                       Garments.                                                                
2353................................  Hats, Caps, and Millinery.............  500                               
2361................................  Girls', Children's, and Infants'        500                               
                                       Dresses, Blouses, and Shirts.                                            
2369................................  Girls', Children's, and Infants'        500                               
                                       Outerwear, N.E.C..                                                       
2371................................  Fur Goods.............................  500                               
2381................................  Dress and Work Gloves, Except Knit and  500                               
                                       All-Leather.                                                             
2384................................  Robes and Dressing Gowns..............  500                               
2385................................  Waterproof Outerwear..................  500                               

[[Page 31627]]

                                                                                                                
2386................................  Leather and Sheep-Lined Clothing......  500                               
2387................................  Apparel Belts.........................  500                               
2389................................  Apparel and Accessories, N.E.C........  500                               
2391................................  Curtains and Draperies................  500                               
2392................................  Housefurnishings, Except Curtains and   500                               
                                       Draperies.                                                               
2393................................  Textile Bags..........................  500                               
2394................................  Canvas and Related Products...........  500                               
2395................................  Pleating, Decorative and Novelty        500                               
                                       Stitching, and Tucking for the Trade.                                    
2396................................  Automotive Trimmings, Apparel           500                               
                                       Findings, and Related Products.                                          
2397................................  Schiffli Machine Embroideries.........  500                               
2399................................  Fabricated Textile Products, N.E.C....  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                           Major Group 24--Lumber and Wood Products, Except Furniture                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2411................................  Logging...............................  500                               
2421................................  Sawmills and Planing Mills, General...  500                               
2426................................  Hardwood Dimension and Flooring Mills.  500                               
2429................................  Special Product Sawmills, N.E.C.......  500                               
2431................................  Millwork..............................  500                               
2434................................  Wood Kitchen Cabinets.................  500                               
2435................................  Hardwood Veneer and Plywood...........  500                               
2436................................  Softwood Veneer and Plywood...........  500                               
2439................................  Structural Wood Members, N.E.C........  500                               
2441................................  Nailed and Lock Corner Wood Boxes and   500                               
                                       Shook.                                                                   
2448................................  Wood Pallets and Skids................  500                               
2449................................  Wood Containers, N.E.C................  500                               
2451................................  Mobile Homes..........................  500                               
2452................................  Prefabricated Wood Buildings and        500                               
                                       Components.                                                              
2491................................  Wood Preserving.......................  500                               
2493................................  Reconstituted Wood Products...........  500                               
2499................................  Wood Products, N.E.C..................  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                     Major Group 25--Furniture and Fixtures                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2511................................  Wood Household Furniture, Except        500                               
                                       Upholstered.                                                             
2512................................  Wood Household Furniture, Upholstered.  500                               
2514................................  Metal Household Furniture.............  500                               
2515................................  Mattresses, Foundations, and            500                               
                                       Convertible Beds.                                                        
2517................................  Wood Television, Radio, Phonograph,     500                               
                                       and Sewing Machine Cabinets.                                             
2519................................  Household Furniture, N.E.C............  500                               
2521................................  Wood Office Furniture.................  500                               
2522................................  Office Furniture, Except Wood.........  500                               
2531................................  Public Building and Related Furniture.  500                               
2541................................  Wood Office and Store Fixtures,         500                               
                                       Partitions, Shelving, and Lockers.                                       
2542................................  Office and Store Fixtures, Partitions,  500                               
                                       Shelving, and Lockers, Except Wood.                                      
2591................................  Drapery Hardware and Window Blinds and  500                               
                                       Shades.                                                                  
2599................................  Furniture and Fixtures, N.E.C.........  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 26--Paper and Allied Products                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2611................................  Pulp Mills............................  750                               
2621................................  Paper Mills...........................  750                               
2631................................  Paperboard Mills......................  750                               
2652................................  Setup Paperboard Boxes................  500                               
2653................................  Corrugated and Solid Fiber Boxes......  500                               
2655................................  Fiber Cans, Tubes, Drums, and Similar   500                               
                                       Products.                                                                
2656................................  Sanitary Food Containers, Except        750                               
                                       Folding.                                                                 
2657................................  Folding Paperboard Boxes, Including     750                               
                                       Sanitary.                                                                
2671................................  Packaging Paper and Plastics Film,      500                               
                                       Coated and Laminated.                                                    
2672................................  Coated and Laminated Paper, N.E.C.....  500                               
2673................................  Plastics, Foil, and Coated Paper Bags.  500                               
2674................................  Uncoated Paper and Multiwall Bags.....  500                               
2675................................  Die-Cut Paper and Paperboard and        500                               
                                       Cardboard.                                                               
2676................................  Sanitary Paper Products...............  500                               
2677................................  Envelopes.............................  500                               
2678................................  Stationery, Tablets, and Related        500                               
                                       Products.                                                                
2679................................  Converted Paper and Paperboard          500                               
                                       Products, N.E.C.                                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 31628]]

                                                                                                                
                           Major Group 27--Printing, Publishing, and Allied Industries                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2711................................  Newspapers: Publishing, or Publishing   500                               
                                       and Printing.                                                            
2721................................  Periodicals: Publishing, or Publishing  500                               
                                       and Printing.                                                            
2731................................  Books: Publishing, or Publishing and    500                               
                                       Printing.                                                                
2732................................  Book Printing.........................  500                               
2741................................  Miscellaneous Publishing..............  500                               
2752................................  Commercial Printing, Lithographic.....  500                               
2754................................  Commercial Printing, Gravure..........  500                               
2759................................  Commercial Printing, N.E.C............  500                               
2761................................  Manifold Business Forms...............  500                               
2771................................  Greeting Cards........................  500                               
2782................................  Blankbooks, Looseleaf Binders and       500                               
                                       Devices.                                                                 
2789................................  Bookbinding and Related Work..........  500                               
2791................................  Typesetting...........................  500                               
2796................................  Platemaking and Related Services......  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                  Major Group 28--Chemicals and Allied Products                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2812................................  Alkalies and Chlorine.................  1,000                             
2813................................  Industrial Gases......................  1,000                             
2816................................  Inorganic Pigments....................  1,000                             
2819................................  Industrial Inorganic Chemicals, N.E.C.  1,000                             
2821................................  Plastics Materials, Synthetic Resins,   750                               
                                       and Nonvulcanizable Elastomers.                                          
2822................................  Synthetic Rubber (Vulcanizable          1,000                             
                                       Elastomers).                                                             
2823................................  Cellulosic Manmade Fibers.............  1,000                             
2824................................  Manmade Organic Fibers, Except          1,000                             
                                       Cellulosic.                                                              
2833................................  Medicinal Chemicals and Botanical       750                               
                                       Products.                                                                
2834................................  Pharmaceutical Preparations...........  750                               
2835................................  In Vitro and In Vivo Diagnostic         500                               
                                       Substances.                                                              
2836................................  Biological Products, Except Diagnostic  500                               
                                       Substances.                                                              
2841................................  Soap and Other Detergents, Except       750                               
                                       Specialty Cleaners.                                                      
2842................................  Specialty Cleaning, Polishing, and      500                               
                                       Sanitation Preparations.                                                 
2843................................  Surface Active Agents, Finishing        500                               
                                       Agents, Sulfonated Oils, and                                             
                                       Assistants.                                                              
2844................................  Perfumes, Cosmetics, and Other Toilet   500                               
                                       Preparations.                                                            
2851................................  Paints, Varnishes, Lacquers, Enamels,   500                               
                                       and Allied Products.                                                     
2861................................  Gum and Wood Chemicals................  500                               
2865................................  Cyclic Organic Crudes and               750                               
                                       Intermediates, and Organic Dyes and                                      
                                       Pigments.                                                                
2869................................  Industrial Organic Chemicals, N.E.C...  1,000                             
2873................................  Nitrogenous Fertilizers...............  1,000                             
2874................................  Phosphatic Fertilizers................  500                               
2875................................  Fertilizers, Mixing Only..............  500                               
2879................................  Pesticides and Agricultural Chemicals,  500                               
                                       N.E.C..                                                                  
2891................................  Adhesives and Sealants................  500                               
2892................................  Explosives............................  750                               
2893................................  Printing Ink..........................  500                               
2895................................  Carbon Black..........................  500                               
2899................................  Chemicals and Chemical Preparations,    500                               
                                       N.E.C..                                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                            Major Group 29--Petroleum Refining and Related Industries                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
2911................................  Petroleum Refining....................  1,500 \4\                         
2951................................  Asphalt Paving Mixtures and Blocks....  500                               
2952................................  Asphalt Felts and Coatings............  750                               
2992................................  Lubricating Oils and Greases..........  500                               
2999................................  Products of Petroleum and Coal, N.E.C.  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                           Major Group 30--Rubber and Miscellaneous Plastics Products                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3011................................  Tires and Inner Tubes.................  1,000 \5\                         
3021................................  Rubber and Plastics Footwear..........  1,000                             
3052................................  Rubber and Plastics Hose and Belting..  500                               
3053................................  Gaskets, Packing, and Sealing Devices.  500                               
3061................................  Molded, Extruded, and Lathe-Cut         500                               
                                       Mechanical Rubber Goods.                                                 
3069................................  Fabricated Rubber Products, N.E.C.....  500                               
3081................................  Unsupported Plastics Film and Sheet...  500                               
3082................................  Unsupported Plastics Profile Shapes...  500                               
3083................................  Laminated Plastics Plate, Sheet, and    500                               
                                       Profile Shapes.                                                          

[[Page 31629]]

                                                                                                                
3084................................  Plastics Pipe.........................  500                               
3085................................  Plastics Bottles......................  500                               
3086................................  Plastics Foam Products................  500                               
3087................................  Custom Compounding of Purchased         500                               
                                       Plastics Resins.                                                         
3088................................  Plastics Plumbing Fixtures............  500                               
3089................................  Plastics Products, N.E.C..............  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                  Major Group 31--Leather and Leather Products                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3111................................  Leather Tanning and Finishing.........  500                               
3131................................  Boot and Shoe Cut Stock and Findings..  500                               
3142................................  House Slippers........................  500                               
3143................................  Men's Footwear, Except Athletic.......  500                               
3144................................  Women's Footwear, Except Athletic.....  500                               
3149................................  Footwear, Except Rubber, N.E.C........  500                               
3151................................  Leather Gloves and Mittens............  500                               
3161................................  Luggage...............................  500                               
3171................................  Women's Handbags and Purses...........  500                               
3172................................  Personal Leather Goods, Except Women's  500                               
                                       Handbags and Purses.                                                     
3199................................  Leather Goods, N.E.C..................  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                           Major Group 32--Stone, Clay, Glass, and Concrete Products                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3211................................  Flat Glass............................  1,000                             
3221................................  Glass Containers......................  750                               
3229................................  Pressed and Blown Glass and Glassware,  750                               
                                       N.E.C..                                                                  
3231................................  Glass Products, Made of Purchased       500                               
                                       Glass.                                                                   
3241................................  Cement, Hydraulic.....................  750                               
3251................................  Brick and Structural Clay Tile........  500                               
3253................................  Ceramic Wall and Floor Tile...........  500                               
3255................................  Clay Refractories.....................  500                               
3259................................  Structural Clay Products, N.E.C.......  500                               
3261................................  Vitreous China Plumbing Fixtures and    750                               
                                       China and Earthenware Fittings and                                       
                                       Bathroom Accessories.                                                    
3262................................  Vitreous China Table and Kitchen        500                               
                                       Articles.                                                                
3263................................  Fine Earthenware (Whiteware) Table and  500                               
                                       Kitchen Articles.                                                        
3264................................  Porcelain Electrical Supplies.........  500                               
3269................................  Pottery Products, N.E.C...............  500                               
3271................................  Concrete Block and Brick..............  500                               
3272................................  Concrete Products, Except Block and     500                               
                                       Brick.                                                                   
3273................................  Ready Mixed Concrete..................  500                               
3274................................  Lime..................................  500                               
327
FR Doc. 96-14523 Federal Acquisition Regulation; Small Business Size Standards
5................................  Gypsum Products.......................  1,000                             
3281................................  Cut Stone and Stone Products..........  500                               
3291................................  Abrasive Products.....................  500                               
3292................................  Asbestos Products.....................  750                               
3295................................  Minerals and Earths, Ground or          500                               
                                       Otherwise Treated.                                                       
3296................................  Mineral Wool..........................  750                               
3297................................  Nonclay Refractories..................  750                               
3299................................  Nonmetallic Mineral Products, N.E.C...  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                     Major Group 32--Primary Metal Industries                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3312................................  Steel Works, Blast Furnaces (Including  1,000                             
                                       Coke Ovens), and Rolling Mills.                                          
3313................................  Electrometallurgical Products, Except   750                               
                                       Steel.                                                                   
3315................................  Steel Wiredrawing and Steel Nails and   1,000                             
                                       Spikes.                                                                  
3316................................  Cold-Rolled Steel Sheet, Strip, and     1,000                             
                                       Bars.                                                                    
3317................................  Steel Pipe and Tubes..................  1,000                             
3321................................  Gray and Ductile Iron Foundries.......  500                               
3322................................  Malleable Iron Foundries..............  500                               
3324................................  Steel Investment Foundries............  500                               
3325................................  Steel Foundries, N.E.C................  500                               
3331................................  Primary Smelting and Refining of        1,000                             
                                       Copper.                                                                  
3334................................  Primary Production of Aluminum........  1,000                             
3339................................  Primary Smelting and Refining of        750                               
                                       Nonferrous Metals, Except Copper and                                     
                                       Aluminum.                                                                
3341................................  Secondary Smelting and Refining of      500                               
                                       Nonferrous Metals.                                                       
3351................................  Rolling, Drawing, and Extruding of      750                               
                                       Copper.                                                                  
3353................................  Aluminum Sheet, Plate, and Foil.......  750                               
3354................................  Aluminum Extruded Products............  750                               

[[Page 31630]]

                                                                                                                
3355................................  Aluminum Rolling and Drawing, N.E.C...  750                               
3356................................  Rolling, Drawing, and Extruding of      750                               
                                       Nonferrous Metals, Except Copper and                                     
                                       Aluminum.                                                                
3357................................  Drawing and Insulating of Nonferrous    1,000                             
                                       Wire.                                                                    
3363................................  Aluminum Die-Castings.................  500                               
3364................................  Nonferrous Die-Castings, Except         500                               
                                       Aluminum.                                                                
3365................................  Aluminum Foundries....................  500                               
3366................................  Copper Foundries......................  500                               
3369................................  Nonferrous Foundries, Except Aluminum   500                               
                                       and Copper.                                                              
3398................................  Metal Heat Treating...................  750                               
3399................................  Primary Metal Products, N.E.C.........  750                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
            Major Group 34--Fabricated Metal Products, Except Machinery and Transportation Equipment            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3411................................  Metal Cans............................  1,000                             
3412................................  Metal Shipping Barrels, Drums, Kegs,    500                               
                                       and Pails.                                                               
3421................................  Cutlery...............................  500                               
3423................................  Hand and Edge Tools, Except Machine     500                               
                                       Tools and Handsaws.                                                      
3425................................  Saw Blades and Handsaws...............  500                               
3429................................  Hardware, N.E.C.......................  500                               
3431................................  Enameled Iron and Metal Sanitary Ware.  750                               
3432................................  Plumbing Fixture Fittings and Trim....  500                               
3433................................  Heating Equipment, Except Electric and  500                               
                                       Warm Air Furnaces.                                                       
3441................................  Fabricated Structural Metal...........  500                               
3442................................  Metal Doors, Sash, Frames, Molding,     500                               
                                       and Trim.                                                                
3443................................  Fabricated Plate Work (Boiler Shops)..  500                               
3444................................  Sheet Metal Work......................  500                               
3446................................  Architectural and Ornamental Metal      500                               
                                       Work.                                                                    
3448................................  Prefabricated Metal Buildings and       500                               
                                       Components.                                                              
3449................................  Miscellaneous Structural Metal Work...  500                               
3451................................  Screw Machine Products................  500                               
3452................................  Bolts, Nuts, Screws, Rivets, and        500                               
                                       Washers.                                                                 
3462................................  Iron and Steel Forgings...............  500                               
3463................................  Nonferrous Forgings...................  500                               
3465................................  Automotive Stampings..................  500                               
3466................................  Crowns and Closures...................  500                               
3469................................  Metal Stampings, N.E.C................  500                               
3471................................  Electroplating, Plating, Polishing,     500                               
                                       Anodizing, and Coloring.                                                 
3479................................  Coating, Engraving, and Allied          500                               
                                       Services, N.E.C..                                                        
3482................................  Small Arms Ammunition.................  1,000                             
3483................................  Ammunition, Except for Small Arms.....  1,500                             
3484................................  Small Arms............................  1,000                             
3489................................  Ordnance and Accessories, N.E.C.......  500                               
3491................................  Industrial Valves.....................  500                               
3492................................  Fluid Power Valves and Hose Fittings..  500                               
3493................................  Steel Springs, Except Wire............  500                               
3494................................  Valves and Pipe Fittings, N.E.C.......  500                               
3495................................  Wire Springs..........................  500                               
3496................................  Miscellaneous Fabricated Wire Products  500                               
3497................................  Metal Foil and Leaf...................  500                               
3498................................  Fabricated Pipe and Pipe Fittings.....  500                               
3499................................  Fabricated Metal Products, N.E.C......  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                   Major Group 35--Industrial and Commercial Machinery and Computer Equipment                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3511................................  Steam, Gas, and Hydraulic Turbines,     1,000                             
                                       and Turbine Generator Set Units.                                         
3519................................  Internal Combustion Engines, N.E.C....  1,000                             
3523................................  Farm Machinery and Equipment..........  500                               
3524................................  Lawn and Garden Tractors and Home Lawn  500                               
                                       and Garden Equipment.                                                    
3531................................  Construction Machinery and Equipment..  750                               
3532................................  Mining Machinery and Equipment, Except  500                               
                                       Oil and Gas Field Machinery and                                          
                                       Equipment.                                                               
3533................................  Oil and Gas Field Machinery and         500                               
                                       Equipment.                                                               
3534................................  Elevators and Moving Stairways........  500                               
3535................................  Conveyors and Conveying Equipment.....  500                               
3536................................  Overhead Traveling Cranes, Hoists, and  500                               
                                       Monorail Systems.                                                        
3537................................  Industrial Trucks, Tractors, Trailers,  750                               
                                       and Stackers.                                                            
3541................................  Machine Tools, Metal Cutting Types....  500                               
3542................................  Machine Tools, Metal Forming Types....  500                               
3543................................  Industrial Patterns...................  500                               
3544................................  Special Dies and Tools, Die Sets, Jigs  500                               
                                       and Fixtures, and Industrial Molds.                                      

[[Page 31631]]

                                                                                                                
3545................................  Cutting Tools, Machine Tool             500                               
                                       Accessories, and Machinists'                                             
                                       Precision Measuring Devices.                                             
3546................................  Power-Driven Handtools................  500                               
3547................................  Rolling Mill Machinery and Equipment..  500                               
3548................................  Electric and Gas Welding and Soldering  500                               
                                       Equipment.                                                               
3549................................  Metalworking Machinery, N.E.C.........  500                               
3552................................  Textile Machinery.....................  500                               
3553................................  Woodworking Machinery.................  500                               
3554................................  Paper Industries Machinery............  500                               
3555................................  Printing Trades Machinery and           500                               
                                       Equipment.                                                               
3556................................  Food Products Machinery...............  500                               
3559................................  Special Industry Machinery, N.E.C.....  500                               
3561................................  Pumps and Pumping Equipment...........  500                               
3562................................  Ball and Roller Bearings..............  750                               
3563................................  Air and Gas Compressors...............  500                               
3564................................  Industrial and Commercial Fans and      500                               
                                       Blowers and Air Purification                                             
                                       Equipment.                                                               
3565................................  Packaging Machinery...................  500                               
3566................................  Speed Changers, Industrial High-Speed   500                               
                                       Drives, and Gears.                                                       
3567................................  Industrial Process Furnaces and Ovens.  500                               
3568................................  Mechanical Power Transmission           500                               
                                       Equipment, N.E.C..                                                       
3569................................  General Industrial Machinery and        500                               
                                       Equipment, N.E.C..                                                       
3571................................  Electronic Computers..................  1,000                             
3572................................  Computer Storage Devices..............  1,000                             
3575................................  Computer Terminals....................  1,000                             
3577................................  Computer Peripheral Equipment, N.E.C..  1,000                             
3578................................  Calculating and Accounting Machines,    1,000                             
                                       Except Electronic Computers.                                             
3579................................  Office Machines, N.E.C................  500                               
3581................................  Automatic Vending Machines ...........  500                               
3582................................  Commercial Laundry, Drycleaning, and    500                               
                                       Pressing Machines.                                                       
3585................................  Air-Conditioning and Warm Air Heating   750                               
                                       Equipment and Commercial and                                             
                                       Industrial Refrigeration Equipment.                                      
3586................................  Measuring and Dispensing Pumps........  500                               
3589................................  Service Industry Machinery, N.E.C.....  500                               
3592................................  Carburetors, Pistons, Piston Rings,     500                               
                                       and Valves.                                                              
3593................................  Fluid Power Cylinders and Actuators...  500                               
3594................................  Fluid Power Pumps and Motors..........  500                               
3596................................  Scales and Balances, Except Laboratory  500                               
3599................................  Industrial and Commercial Machinery     500                               
                                       and Equipment, N.E.C.                                                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
      Major Group 36--Electronic and Other Electrical Equipment and Components, Except Computer Equipment       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3612................................  Power, Distribution, and Specialty      750                               
                                       Transformers.                                                            
3613................................  Switchgear and Switchboard Apparatus..  750                               
3621................................  Motors and Generators.................  1,000                             
3624................................  Carbon and Graphite Products..........  750                               
3625................................  Relays and Industrial Controls........  750                               
3629................................  Electrical Industrial Apparatus,        500                               
                                       N.E.C..                                                                  
3631................................  Household Cooking Equipment...........  750                               
3632................................  Household Refrigerators and Home and    1,000                             
                                       Farm Freezers.                                                           
3633................................  Household Laundry Equipment...........  1,000                             
3634................................  Electric Housewares and Fans .........  750                               
3635................................  Household Vacuum Cleaners.............  750                               
3639................................  Household Appliances, N.E.C. .........  500                               
3641................................  Electric Lamp Bulbs and Tubes.........  1,000                             
3643................................  Current-Carrying Wiring Devices.......  500                               
3644................................  Noncurrent-Carrying Wiring Devices....  500                               
3645................................  Residential Electric Lighting Fixtures  500                               
3646................................  Commercial, Industrial, and             500                               
                                       Institutional Electric Lighting                                          
                                       Fixtures.                                                                
3647................................  Vehicular Lighting Equipment..........  500                               
3648................................  Lighting Equipment, N.E.C.............  500                               
3651................................  Household Audio and Video Equipment...  750                               
3652................................  Phonograph Records and Prerecorded      750                               
                                       Audio Tapes and Disks.                                                   
3661................................  Telephone and Telegraph Apparatus.....  1,000                             
3663................................  Radio and Television Broadcasting and   750                               
                                       Communications Equipment.                                                
3669................................  Communications Equipment, N.E.C.......  750                               
3671................................  Electron Tubes........................  750                               
3672................................  Printed Circuit Boards................  500                               
3674................................  Semiconductors and Related Devices....  500                               
3675................................  Electronic Capacitors.................  500                               
3676................................  Electronic Resistors..................  500                               
3677................................  Electronic Coils, Transformers, and     500                               
                                       Other Inductors.                                                         

[[Page 31632]]

                                                                                                                
3678................................  Electronic Connectors.................  500                               
3679................................  Electronic Components, N.E.C..........  500                               
3691................................  Storage Batteries.....................  500                               
3692................................  Primary Batteries, Dry and Wet........  1,000                             
3694................................  Electrical Equipment for Internal       750                               
                                       Combustion Engines.                                                      
3695................................  Magnetic and Optical Recording Media..  1,000                             
3699................................  Electrical Machinery, Equipment, and    750                               
                                       Supplies, N.E.C..                                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 37--Transportation Equipment                                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3711................................  Motor Vehicles and Passenger Car        1,000                             
                                       Bodies.                                                                  
3713................................  Truck and Bus Bodies..................  500                               
3714................................  Motor Vehicle Parts and Accessories...  750                               
3715................................  Truck Trailers........................  500                               
3716................................  Motor Homes...........................  1,000                             
3721................................  Aircraft..............................  1,500                             
3724................................  Aircraft Engines and Engine Parts.....  1,000                             
3728................................  Aircraft Parts and Auxiliary            1,000 \9\                         
                                       Equipment, N.E.C.                                                        
3731................................  Shipbuilding and Repair of Nuclear      1,000                             
                                       Propelled Ships.                                                         
Except..............................  Shipbuilding of Nonnuclear Propelled    1,000                             
                                       Ships and Nonpropelled Ships.                                            
                                      Ship Repair (Including Overhauls and    1,000                             
                                       Conversions) Performed on Nonnuclear                                     
                                       Propelled and Nonpropelled Ships East                                    
                                       of the 108 Meridian.                                                     
                                      Ship Repair (Including Overhauls and    1,000                             
                                       Conversions) Performed on Nonnuclear                                     
                                       Propelled and Nonpropelled Ships West                                    
                                       of the 108 Meridian.                                                     
3732................................  Boat Building and Repairing...........  500                               
3743................................  Railroad Equipment....................  1,000                             
3751................................  Motorcycles, Bicycles, and Parts......  500                               
3761................................  Guided Missiles and Space Vehicles....  1,000                             
3764................................  Guided Missile and Space Vehicle        1,000                             
                                       Propulsion Units and Propulsion Unit                                     
                                       Parts.                                                                   
3769................................  Guided Missile and Space Vehicle Parts  1,000                             
                                       and Auxiliary Equipment, N.E.C.                                          
3792................................  Travel Trailers and Campers...........  500                               
3795................................  Tanks and Tank Components.............  1,000                             
3799................................  Transportation Equipment, N.E.C. .....  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
  Major Group 38--Measuring, Analyzing, and Controlling Instruments; Photographic, Medical, and Optical Goods;  
                                               Watches and Clocks                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3812................................  Search, Detection, Navigation,          750                               
                                       Guidance, Aeronautical, and Nautical                                     
                                       Systems and Instruments.                                                 
3821................................  Laboratory Apparatus and Furniture....  500                               
3822................................  Automatic Controls for Regulating       500                               
                                       Residential and Commercial                                               
                                       Environments and Appliances.                                             
3823................................  Industrial Instruments for              500                               
                                       Measurement, Display, and Control of                                     
                                       Process Variables; and Related                                           
                                       Products.                                                                
3824................................  Totalizing Fluid Meters and Counting    500                               
                                       Devices.                                                                 
3825................................  Instruments for Measuring and Testing   500                               
                                       of Electricity and Electrical Signals.                                   
3826................................  Laboratory Analytical Instruments.....  500                               
3827................................  Optical Instruments and Lenses........  500                               
3829................................  Measuring and Controlling Devices,      500                               
                                       N.E.C.                                                                   
3841................................  Surgical and Medical Instruments and    500                               
                                       Apparatus.                                                               
3842................................  Orthopedic, Prosthetic, and Surgical    500                               
                                       Appliances and Supplies.                                                 
3843................................  Dental Equipment and Supplies.........  500                               
3844................................  X-Ray Apparatus and Tubes and Related   500                               
                                       Irradiation Apparatus.                                                   
3845................................  Electromedical and Electrotherapeutic   500                               
                                       Apparatus.                                                               
3851................................  Ophthalmic Goods......................  500                               
3861................................  Photographic Equipment and Supplies...  500                               
3873................................  Watches, Clocks, Clockwork Operated     500                               
                                       Devices, and Parts.                                                      
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                              Major Group 39--Miscellaneous Manufacturing Industries                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
3911................................  Jewelry, Precious Metal...............  500                               
3914................................  Silverware, Plated Ware, and Stainless  500                               
                                       Steel Ware.                                                              
3915................................  Jewelers' Findings and Materials, and   500                               
                                       Lapidary Work.                                                           
3931................................  Musical Instruments...................  500                               
3942................................  Dolls and Stuffed Toys................  500                               
3944................................  Games, Toys, and Children's Vehicles,   500                               
                                       Except Dolls and Bicycles.                                               
3949................................  Sporting and Athletic Goods, N.E.C....  500                               
3951................................  Pens, Mechanical Pencils, and Parts...  500                               
3952................................  Lead Pencils, Crayons, and Artists'     500                               
                                       Materials.                                                               
3953................................  Marking Devices.......................  500                               

[[Page 31633]]

                                                                                                                
3955................................  Carbon Paper and Inked Ribbons........  500                               
3961................................  Costume Jewelry and Costume Novelties,  500                               
                                       Except Precious Metal.                                                   
3965................................  Fasteners, Buttons, Needles, and Pins.  500                               
3991................................  Brooms and Brushes....................  500                               
3993................................  Signs and Advertising Specialties.....  500                               
3995................................  Burial Caskets........................  500                               
3996................................  Linoleum, Asphalted-Felt-Base, and      750                               
                                       Other Hard Surface Floor Coverings,                                      
                                       N.E.C..                                                                  
3999................................  Manufacturing Industries, N.E.C.......  500                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                 Division E--Transportation, Communications Electric, Gas, and Sanitary Services                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                     Major Group 40--Railroad Transportation                                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4011................................  Railroads, Line-Haul Operating........  1,500                             
4013................................  Railroad Switching and Terminal         500                               
                                       Establishments.                                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
            Major Group 41--Local and Suburban Transit and Interurban Highway Passenger Transportation          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4111................................  Local and Suburban Transit............  $5.0                              
4119................................  Local Passenger Transportation, N.E.C.  $5.0                              
4121................................  Taxicabs..............................  $5.0                              
4131................................  Intercity and Rural Bus Transportation  $5.0                              
4141................................  Local Bus Charter Service.............  $5.0                              
4142................................  Bus Charter Service, Except Local.....  $5.0                              
4151................................  School Buses..........................  $5.0                              
4173................................  Terminal and Service Facilities for     $5.0                              
                                       Motor Vehicle Passenger                                                  
                                       Transportation.                                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                           Major Group 42--Motor Freight Transportation and Warehousing                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4212................................  Local Trucking Without Storage........  $18.5                             
Except..............................  Garbage and Refuse Collection, Without  $6.0                              
                                       Disposal.                                                                
4213................................  Trucking, Except Local................  $18.5                             
4214................................  Local Trucking With Storage...........  $18.5                             
4215................................  Courier Services, Except by Air.......  $18.5                             
4221................................  Farm Product Warehousing and Storage..  $18.5                             
4222................................  Refrigerated Warehousing and Storage..  $18.5                             
4225................................  General Warehousing and Storage.......  $18.5                             
4226................................  Special Warehousing and Storage,        $18.5                             
                                       N.E.C..                                                                  
4231................................  Terminal and Joint Terminal             $5.0                              
                                       Maintenance Facilities for Motor                                         
                                       Freight Transportation.                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                       Major Group 44--Water Transportation                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4412................................  Deep Sea Foreign Transportation of      500                               
                                       Freight.                                                                 
4424................................  Deep Sea Domestic Transportation of     500                               
                                       Freight.                                                                 
4432................................  Freight Transportation on the Great     500                               
                                       Lakes--St. Lawrence Seaway.                                              
4449................................  Water Transportation of Freight,        500                               
                                       N.E.C..                                                                  
4481................................  Deep Sea Transportation of Passengers,  500                               
                                       Except by Ferry.                                                         
4482................................  Ferries...............................  500                               
4489................................  Water Transportation of Passengers,     500                               
                                       N.E.C..                                                                  
4491................................  Marine Cargo Handling.................  $18.5                             
4492................................  Towing and Tugboat Services...........  $5.0                              
4493................................  Marinas...............................  $5.0                              
4499................................  Water Transportation Services, N.E.C..  $5.0                              
Except..............................  Offshore Marine Water Transportation    $20.5                             
                                       Services.                                                                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                      Major Group 45--Transportation by Air                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4512................................  Air Transportation, Scheduled.........  1,500                             
4513................................  Air Courier Services..................  1,500                             
4522................................  Air Transportation, Nonscheduled,.....  1,500                             
Except..............................  Offshore Marine Air Transportation      $20.5                             
                                       Services.                                                                
4581................................  Airports, Flying Fields, and Airport    $5.0                              
                                       Terminal Services.                                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                 Major Group 46--Pipelines, Except Natural Gas                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4612................................  Crude Petroleum Pipelines.............  1,500                             
4613................................  Refined Petroleum Pipelines...........  1,500                             

[[Page 31634]]

                                                                                                                
4619................................  Pipelines, N.E.C......................  $25.0                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 47--Transportation Services                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4724................................  Travel Agencies.......................  $1.0 \6\                          
4725................................  Tour Operators........................  $5.0                              
4729................................  Arrangement of Passenger                $5.0                              
                                       Transportation, N.E.C..                                                  
4731................................  Arrangement of Transportation of        $18.5                             
                                       Freight and Cargo.                                                       
4741................................  Rental of Railroad Cars...............  $5.0                              
4783................................  Packing and Crating...................  $18.5                             
4785................................  Fixed Facilities and Inspection and     $5.0                              
                                       Weighing Services for Motor Vehicle                                      
                                       Transportation.                                                          
4789................................  Transportation Services, N.E.C........  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Major Group 48--Communications                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4812................................  Radiotelephone Communications.........  1,500                             
4813................................  Telephone Communications, Except        1,500                             
                                       Radiotelephone.                                                          
4822................................  Telegraph and Other Message             $5.0                              
                                       Communications.                                                          
4832................................  Radio Broadcasting Stations...........  $5.0                              
4833................................  Television Broadcasting Stations......  $10.5                             
4841................................  Cable and Other Pay Television          $11.0                             
                                       Services.                                                                
4899................................  Communications Services, N.E.C........  $11.0                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                              Major Group 49--Electric, Gas, and Sanitary Services                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
4911................................  Electric Services.....................  4 million megawatt hrs.           
4922................................  Natural Gas Transmission..............  $5.0                              
4923................................  Gas Transmission and Distribution.....  $5.0                              
4924................................  Natural Gas Distribution..............  500                               
4925................................  Mixed, Manufactured, or Liquefied       $5.0                              
                                       Petroleum.                                                               
  ..................................  Gas Production and/or Distribution....                                    
4931................................  Electric and Other Services Combined..  $5.0                              
4932................................  Gas and Other Services Combined.......  $5.0                              
4939................................  Combination Utilities, N.E.C..........  $5.0                              
4941................................  Water Supply..........................  $5.0                              
4952................................  Sewerage Systems......................  $5.0                              
4953................................  Refuse Systems........................  $6.0                              
4959................................  Sanitary Services, N.E.C..............  $5.0                              
4961................................  Steam and Air-Conditioning Supply.....  $9.0                              
4971................................  Irrigation Systems....................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                          Division F--Wholesale Trade                                           
                                                                                                                
----------------------------------------------------------------------------------------------------------------
 (Not Applicable to Government procurement of supplies. The nonmanufacturer size standard of 500 employees shall
                          be used for purposes of Government procurement of supplies.)                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                 Major Group 50--Wholesale Trade--Durable Goods                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5012................................  Automobiles and Other Motor Vehicles..  100                               
5013................................  Motor Vehicle Supplies and New Parts..  100                               
5014................................  Tires and Tubes.......................  100                               
5015................................  Motor Vehicle Parts, Used.............  100                               
5021................................  Furniture.............................  100                               
5023................................  Homefurnishings.......................  100                               
5031................................  Lumber, Plywood, Millwork, and Wood     100                               
                                       Panels.                                                                  
5032................................  *Brick, Stone, and Related              100                               
                                       Construction Materials.                                                  
5033................................  Roofing, Siding, and Insulation         100                               
                                       Materials.                                                               
5039................................  Construction Materials, N.E.C.........  100                               
5043................................  Photographic Equipment and Supplies...  100                               
5044................................  Office Equipment......................  100                               
5045................................  Computers and Computer Peripheral       100                               
                                       Equipment and Software.                                                  
5046................................  Commercial Equipment, N.E.C...........  100                               
5047................................  Medical, Dental, and Hospital           100                               
                                       Equipment and Supplies.                                                  
5048................................  Ophthalmic Goods......................  100                               
5049................................  Professional Equipment and Supplies,    100                               
                                       N.E.C..                                                                  
5051................................  Metals Service Centers and Offices....  100                               
5052................................  Coal and Other Minerals and Ores......  100                               

[[Page 31635]]

                                                                                                                
5063................................  Electrical Apparatus and Equipment,     100                               
                                       Wiring Supplies, and Construction                                        
                                       Materials.                                                               
5064................................  *Electrical Appliances, Television and  100                               
                                       Radio Sets.                                                              
5065................................  Electronic Parts and Equipment, N.E.C.  100                               
5072................................  Hardware..............................  100                               
5074................................  Plumbing and Heating Equipment and      100                               
                                       Supplies (Hydronics).                                                    
5075................................  Warm Air Heating and Air-Conditioning   100                               
                                       Equipment and Supplies.                                                  
5078................................  Refrigeration Equipment and Supplies..  100                               
5082................................  Construction and Mining (Except         100                               
                                       Petroleum) Machinery and Equipment.                                      
5083................................  Farm and Garden Machinery and           100                               
                                       Equipment.                                                               
5084................................  Industrial Machinery and Equipment....  100                               
5085................................  Industrial Supplies...................  100                               
5087................................  Service Establishment Equipment and     100                               
                                       Supplies.                                                                
5088................................  Transportation Equipment and Supplies,  100                               
                                       Except Motor Vehicles.                                                   
5091................................  Sporting and Recreational Goods and     100                               
                                       Supplies.                                                                
5092................................  Toys and Hobby Goods and Supplies.....  100                               
5093................................  Scrap and Waste Materials.............  100                               
5094................................  Jewelry, Watches, Precious Stones, and  100                               
                                       Precious Metals.                                                         
5099................................  Durable Goods, N.E.C..................  100                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                Major Group 51--Wholesale Trade--Nondurable Goods                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5111................................  Printing and Writing Paper............  100                               
5112................................  Stationery and Office Supplies........  100                               
5113................................  Industrial and Personal Service Paper.  100                               
5122................................  Drugs, Drug Proprietaries, and          100                               
                                       Druggists' Sundries.                                                     
5131................................  Piece Goods, Notions, and Other Dry     100                               
                                       Goods.                                                                   
5136................................  Men's and Boys' Clothing and            100                               
                                       Furnishings.                                                             
5137................................  Women's, Children's, and Infants'       100                               
                                       Clothing and Accessories.                                                
5139................................  Footwear..............................  100                               
5141................................  Groceries, General Line...............  100                               
5142................................  Packaged Frozen Foods.................  100                               
5143................................  Dairy Products, Except Dried or Canned  100                               
5144................................  Poultry and Poultry Products..........  100                               
5145................................  Confectionery.........................  100                               
5146................................  Fish and Seafood......................  100                               
5147................................  Meats and Meat Products...............  100                               
5148................................  Fresh Fruits and Vegetables...........  100                               
5149................................  Groceries and Related Products, N.E.C.  100                               
5153................................  Grain and Field Beans.................  100                               
5154................................  Livestock.............................  100                               
5159................................  Farm-Product Raw Materials, N.E.C.....  100                               
5162................................  Plastics Materials and Basic Forms and  100                               
                                       Shapes.                                                                  
5169................................  Chemical and Allied Products, N.E.C...  100                               
5171................................  Petroleum Bulk Stations and Terminals.  100                               
5172................................  Petroleum and Petroleum Products        100                               
                                       Wholesalers, Except Bulk Stations and                                    
                                       Terminals.                                                               
5181................................  Beer and Ale..........................  100                               
5182................................  Wine and Distilled Alcoholic Beverages  100                               
5191................................  Farm Supplies.........................  100                               
5192................................  Books, Periodicals, and Newspapers....  100                               
5193................................  Flowers, Nursery Stock, and Florists'   100                               
                                       Supplies.                                                                
5194................................  Tobacco and Tobacco Products..........  100                               
5198................................  Paints, Varnishes, and Supplies.......  100                               
5199................................  Nondurable Goods, N.E.C...............  100                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                            Division G--Retail Trade                                            
                             (Not Applicable to Government procurement of supplies.                             
   The nonmanufacturer size standard of 500 employees shall be used for purposes of Government procurement of   
                                                   supplies.)                                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
               Major Group 52--Building Materials, Hardware, Garden Supply, and Mobile Home Dealers             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5211................................  Lumber and Other Building Materials     $5.0                              
                                       Dealers.                                                                 
5231................................  Paint, Glass, and Wallpaper Stores....  $5.0                              
5251................................  Hardware Stores.......................  $5.0                              
5261................................  Retail Nurseries, Lawn and Garden       $5.0                              
                                       Supply Stores.                                                           
5271................................  Mobile Home Dealers...................  $9.5                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 53--General Merchandise Stores                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5311................................  Department Stores.....................  $20.0                             

[[Page 31636]]

                                                                                                                
5331................................  Variety Stores........................  $8.0                              
5399................................  Miscellaneous General Merchandise       $5.0                              
                                       Stores.                                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                           Major Group 54--Food Stores                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5411................................  Grocery Stores........................  $20.0                             
5421................................  Meat and Fish (Seafood) Markets,        $5.0                              
                                       Including Freezer Provisioners.                                          
5431................................  Fruit and Vegetable Markets...........  $5.0                              
5441................................  Candy, Nut, and Confectionery Stores..  $5.0                              
5451................................  Dairy Products Stores.................  $5.0                              
5461................................  Retail Bakeries.......................  $5.0                              
5499................................  Miscellaneous Food Stores.............  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                         Major Group 55--Automotive Dealers and Gasoline Service Stations                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5511................................  Motor Vehicle Dealers (New and Used)..  $21.0                             
5521................................  Motor Vehicle Dealers (Used Only).....  $17.0                             
5531................................  Auto and Home Supply Stores...........  $5.0                              
5541................................  Gasoline Service Stations.............  $6.5                              
5551................................  Boat Dealers..........................  $5.0                              
5561................................  Recreational Vehicle Dealers..........  $5.0                              
5571................................  Motorcycle Dealers....................  $5.0                              
5599................................  Automotive Dealers, N.E.C.............  $5.0                              
Except..............................  Aircraft Dealers, Retail..............  $7.5                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                   Major Group 56--Apparel and Accessory Stores                                 
                                                                                                                
------------------------------------------------------------------------------
FR Doc. 96-14523 Federal Acquisition Regulation; Small Business Size Standards
----------------------------------
5611................................  Men's and Boys' Clothing and Accessory  $6.5                              
                                       Stores.                                                                  
5621................................  Women's Clothing Stores...............  $6.5                              
5632................................  Women's Accessory and Specialty Stores  $5.0                              
5641................................  Children's and Infants' Wear Stores...  $5.0                              
5651................................  Family Clothing Stores................  $6.5                              
5661................................  Shoe Stores...........................  $6.5                              
5699................................  Miscellaneous Apparel and Accessory     $5.0                              
                                       Stores.                                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                        Major Group 57--Home Furniture, Furnishings, and Equipment Stores                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5712................................  Furniture Stores......................  $5.0                              
5713................................  Floor Covering Stores.................  $5.0                              
5714................................  Drapery, Curtain, and Upholstery        $5.0                              
                                       Stores.                                                                  
5719................................  Miscellaneous Homefurnishings Stores..  $5.0                              
5722................................  Household Appliance Stores............  $6.5                              
5731................................  Radio, Television, and Consumer         $6.5                              
                                       Electronics Stores.                                                      
5734................................  Computer and Computer Software Stores.  $6.5                              
5735................................  Record and Prerecorded Tape Stores....  $5.0                              
5736................................  Musical Instrument Stores.............  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                   Major Group 58--Eating and Drinking Places                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5812................................  Eating Places.........................  $5.0                              
Except..............................  Food Service, Institutional...........  $15.0                             
5813................................  Drinking Places (Alcoholic Beverages).  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                      Major Group 59--Miscellaneous Retail                                      
                                                                                                                
----------------------------------------------------------------------------------------------------------------
5812................................  Drug Stores and Proprietary Stores....  $5.0                              
5821................................  Liquor Stores.........................  $5.0                              
5832................................  Used Merchandise Stores...............  $5.0                              
5841................................  Sporting Goods Stores and Bicycle       $5.0                              
                                       Shops.                                                                   
5842................................  Book Stores...........................  $5.0                              
5843................................  Stationery Stores.....................  $5.0                              
5844................................  Jewelry Stores........................  $5.0                              
5845................................  Hobby, Toy, and Game Shops............  $5.0                              
5846................................  Camera and Photographic Supply Stores.  $5.0                              
5847................................  Gift, Novelty, and Souvenir Shops.....  $5.0                              
5848................................  Luggage and Leather Goods Stores......  $5.0                              
5849................................  Sewing, Needlework, and Piece Goods     $5.0                              
                                       Stores.                                                                  

[[Page 31637]]

                                                                                                                
5861................................  Catalog and Mail-Order Houses.........  $18.5                             
5862................................  Automatic Merchandising Machine         $5.0                              
                                       Operators.                                                               
5863................................  Direct Selling Establishments.........  $5.0                              
5883................................  Fuel Oil Dealers......................  $9.0                              
5884................................  Liquefied Petroleum Gas (Bottled Gas)   $5.0                              
                                       Dealers...                                                               
5889................................  Fuel Dealers, N.E.C...................  $5.0                              
5892................................  Florists..............................  $5.0                              
5893................................  Tobacco Stores and Stands.............  $5.0                              
5894................................  News Dealers and Newsstands...........  $5.0                              
5895................................  Optical Goods Stores..................  $5.0                              
5899................................  Miscellaneous Retail Stores, N.E.C....  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                Division H--Finance, Insurance, and Real Estate                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 60--Depository Institutions                                     
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6021................................  National Commercial Banks.............  $100 Million in Assets\7\         
6022................................  State Commercial Banks................  $100 Million in Assets\7\         
6029................................  Commercial Banks, N.E.C...............  $100 Million in Assets\7\         
6035................................  Savings Institutions, Federally         $100 Million in Assets\7\         
                                       Chartered.                                                               
6036................................  Savings Institutions, Not Federally     $100 Million in Assets\7\         
                                       Chartered.                                                               
6061................................  Credit Unions, Federally Chartered....  $100 Million in Assets\7\         
6062................................  Credit Unions, Not Federally Chartered  $100 Million in Assets\7\         
6081................................  Branches and Agencies of Foreign Banks  $100 Million in Assets\7\         
6082................................  Foreign Trade and International Banks.  $100 Million in Assets\7\         
6091................................  Nondeposit Trust Facilities...........  $5.0                              
6099................................  Functions Related to Depositor          $5.0                              
                                       Banking, N.E.C..                                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 61--Nondepository Institution                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6141................................  Personal Credit Institutions..........  $5.0                              
6153................................  Short-Term Business Credit              $5.0 *                            
                                       Institutions, Except Agriculture.                                        
6158................................  Miscellaneous Business Credit           $5.0                              
                                       Institutions.                                                            
6162................................  Mortgage Bankers and Loan               $5.0                              
                                       Correspondents.                                                          
6163................................  Loan Brokers..........................  $5.0                              
                                                                                                                
                                                                                                                
                 Major Group 62--Security and Commodity Brokers, Dealers, Exchanges and Services                
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6211................................  Security Brokers, Dealers and           $5.0                              
                                       Flotation Companies.                                                     
6221................................  Commodity Contracts Brokers and         $5.0                              
                                       Dealers.                                                                 
6231................................  Security and Commodity Exchanges......  $5.0                              
6282................................  Investment Advice.....................  $5.0                              
6289................................  Services Allied With the Exchange of    $5.0                              
                                       Securities or Commodities, N.E.C..                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                       Major Group 63--Insurance Carriers                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6311................................  Life Insurance........................  $5.0                              
6321................................  Accident and Health Insurance.........  $5.0                              
6324................................  Hospital and Medical Service Plans....  $5.0                              
6331................................  Fire, Marine, and Casualty Insurance                                      
                                       1,500.                                                                   
6351................................  Surety Insurance......................  $5.0                              
6361................................  Title Insurance.......................  $5.0                              
6371................................  Pension, Health and Welfare Funds.....  $5.0                              
6399................................  Insurance Carriers, N.E.C.............  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 31638]]

                                                                                                                
                             Major Group 64--Insurance Agents, Brokers, and Service                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6411................................  Insurance Agents, Brokers, and Service  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                           Major Group 65--Real Estate                                          
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6512................................  Operators of Nonresidential Buildings.  $5.0                              
6513................................  Operators of Apartment Buildings......  $5.0                              
6514................................  Operators of Dwellings Other Than       $5.0                              
                                       Apartment Buildings.                                                     
6515................................  Operators of Residential Mobile Home    $5.0                              
                                       Sites,.                                                                  
Except..............................  Leasing of Building Space to Federal    $15.0 \8\                         
                                       Government by Owners.                                                    
6517................................  Lessors of Railroad Property..........  $5.0                              
6519................................  Lessors of Real Property, N.E.C.......  $5.0                              
6531................................  Real Estate Agents and Managers.......  $1.5 \6\                          
6541................................  Title Abstract Offices................  $5.0                              
6552................................  Land Subdividers and Developers,        $5.0                              
                                       Except Cemeteries.                                                       
6553................................  Cemetery Subdividers and Developers...  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                               Major Group 67--Holding and Other Investment Offices                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
6712................................  Offices of Bank Holding Companies.....  $5.0                              
6719................................  Offices of Holding Companies, N.E.C...  $5.0                              
6722................................  Management Investment Offices, Open-    $5.0                              
                                       End.                                                                     
6726................................  Unit Investment Trusts, Face-Amount     $5.0                              
                                       Certificate Offices, and Closed-End                                      
                                       Management Investment Offices.                                           
6732................................  Educational, Religious, and Charitable  $5.0                              
                                       Trusts.                                                                  
6733................................  Trusts, Except Educational, Religious,  $5.0                              
                                       and Charitable.                                                          
6792................................  Oil Royalty Traders...................  $5.0                              
6794................................  Patent Owners and Lessors.............  $5.0                              
6798................................  Real Estate Investment Trusts.........  $5.0                              
6799................................  Investors, N.E.C......................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                               Division I--Services                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                     Major Group 70--Hotels, Rooming Houses, Camps, and Other Lodging Places                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7011................................  Hotels and Motels.....................  $5.0                              
7021................................  Rooming and Boarding Houses...........  $5.0                              
7032................................  Sporting and Recreational Camps.......  $5.0                              
7033................................  Recreational Vehicle Parks and          $5.0                              
                                       Campsites.                                                               
7041................................  Organization Hotels and Lodging         $5.0                              
                                       Houses, on Membership Basis.                                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                        Major Group 72--Personal Services                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7211................................  Power Laundries, Family and Commercial  $10.5                             
7212................................  Garment Pressing, and Agents for        $5.0                              
                                       Laundries and Drycleaners.                                               
7213................................  Linen Supply..........................  $10.5                             
7215................................  Coin-Operated Laundries and             $5.0                              
                                       Drycleaning.                                                             
7216................................  Drycleaning Plants, Except Rug          $3.5                              
                                       Cleaning.                                                                
7217................................  Carpet and Upholstery Cleaning........  $3.5                              
7218................................  Industrial Launderers.................  $10.5                             
7219................................  Laundry and Garment Services, N.E.C...  $5.0                              
7221................................  Photographic Studios, Portrait........  $5.0                              
7231................................  Beauty Shops..........................  $5.0                              
7241................................  Barber Shops..........................  $5.0                              
7251................................  Shoe Repair Shops and Shoeshine         $5.0                              
                                       Parlors.                                                                 
7261................................  Funeral Service and Crematories.......  $5.0                              
7291................................  Tax Return Preparation Services.......  $5.0                              
7299................................  Miscellaneous Personal Services, N.E.C  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                        Major Group 73--Business Services                                       
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7311................................  Advertising Agencies..................  $5.0 \6\                          
7312................................  Outdoor Advertising Services..........  $5.0 \6\                          
7313................................  Radio, Television, and Publishers'      $5.0 \6\                          
                                       Advertising Representatives.                                             
7319................................  Advertising, N.E.C....................  $5.0 \6\                          
7322................................  Adjustment and Collection Services....  $5.0                              

[[Page 31639]]

                                                                                                                
7323................................  Credit Reporting Services.............  $5.0                              
7331................................  Direct Mail Advertising Services......  $5.0                              
7334................................  Photocopying and Duplicating Services.  $5.0                              
7335................................  Commercial Photography................  $5.0                              
7336................................  Commercial Art and Graphic Design.....  $5.0                              
7338................................  Secretarial and Court Reporting         $5.0                              
                                       Services.                                                                
7342................................  Disinfecting and Pest Control Services  $5.0                              
7349................................  Building Cleaning and Maintenance       $12.0                             
                                       Services, N.E.C.                                                         
7352................................  Medical Equipment Rental and Leasing..  $5.0                              
7353................................  Heavy Construction Equipment Rental     $5.0                              
                                       and Leasing.                                                             
7359................................  Equipment Rental and Leasing, N.E.C...  $5.0                              
7361................................  Employment Agencies...................  $5.0                              
7363................................  Help Supply Services..................  $5.0                              
7371................................  Computer Programming Services.........  $18.0                             
7372................................  Prepackaged Software..................  $18.0                             
7373................................  Computer Integrated Systems Design....  $18.0                             
7374................................  Computer Processing and Data            $18.0                             
                                       Preparation and Processing Services.                                     
7375................................  Information Retrieval Services........  $18.0                             
7376................................  Computer Facilities Management          $18.0                             
                                       Services.                                                                
7377................................  Computer Rental and Leasing...........  $18.0                             
7378................................  Computer Maintenance and Repair.......  $18.0                             
7379................................  Computer Related Services, N.E.C......  $18.0                             
7381................................  Detective, Guard, and Armored Car       $9.0                              
                                       Services.                                                                
7382................................  Security Systems Services.............  $9.0                              
7383................................  News Syndicates.......................  $5.0                              
7384................................  Photofinishing Laboratories...........  $5.0                              
7389................................  Business Services, N.E.C..............  $5.0                              
Except..............................  Map Drafting Services, Mapmaking        $3.5                              
                                       (Including Aerial) and                                                   
                                       Photogrammetric Mapping Services.                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                            Major Group 75--Automotive Repair, Services, and Parking                            
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7513................................  Truck Rental and Leasing, Without       $18.5                             
                                       Drivers.                                                                 
7514................................  Passenger Car Rental..................  $18.5                             
7515................................  Passenger Car Leasing.................  $18.5                             
7519................................  Utility Trailer and Recreational        $5.0                              
                                       Vehicle Rental.                                                          
7521................................  Automobile Parking....................  $5.0                              
7532................................  Top, Body, and Upholstery Repair Shops  $5.0                              
                                       and Paint Shops.                                                         
7533................................  Automotive Exhaust System Repair Shops  $5.0                              
7534................................  Tire Retreading and Repair Shops......  $10.5                             
7536................................  Automotive Glass Replacement Shops....  $5.0                              
7537................................  Automotive Transmission Repair Shops..  $5.0                              
7538................................  General Automotive Repair Shops.......  $5.0                              
7539................................  Automotive Repair Shops, N.E.C........  $5.0                              
7542................................  Carwashes.............................  $5.0                              
7549................................  Automotive Services, Except Repair and  $5.0                              
                                       Carwashes.                                                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                  Major Group 76--Miscellaneous Repair Services                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7622................................  Radio and Television Repair Shops.....  $5.0                              
7623................................  Refrigeration and Air-Conditioning      $5.0                              
                                       Service and Repair Shops.                                                
7629................................  Electrical and Electronic Repair        $5.0                              
                                       Shops, N.E.C..                                                           
7631................................  Watch, Clock, and Jewelry Repair......  $5.0                              
7641................................  Reupholstery and Furniture Repair.....  $5.0                              
7692................................  Welding Repair........................  $5.0                              
7694................................  Armature Rewinding Shops..............  $5.0                              
7699................................  Repair Shops and Related Services,      $5.0\9\                           
                                       N.E.C..                                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                         Major Group 78--Motion Pictures                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7812................................  Motion Picture and Video Tape           $21.5                             
                                       Production.                                                              
7819................................  Services Allied to Motion Picture       $21.5                             
                                       Production.                                                              
7822................................  Motion Picture and Video Tape           $21.5                             
                                       Distribution.                                                            
7829................................  Services Allied to Motion Picture       $5.0                              
                                       Distribution.                                                            
7832................................  Motion Picture Theaters, Except Drive-  $5.0                              
                                       In.                                                                      
7833................................  Drive-In Motion Picture Theaters......  $5.0                              
7841................................  Video Tape Rental.....................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------

[[Page 31640]]

                                                                                                                
                                Major Group 79--Amusement and Recreation Services                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
7911................................  Dance Studios, Schools, and Halls.....  $5.0                              
7922................................  Theatrical Producers (Except Motion     $5.0                              
                                       Picture) and Miscellaneous Theatrical                                    
                                       Services.                                                                
7929................................  Bands, Orchestras, Actors, and Other    $5.0                              
                                       Entertainers and Entertainment Groups.                                   
7933................................  Bowling Centers.......................  $5.0                              
7941................................  Professional Sports Clubs and           $5.0                              
                                       Promoters.                                                               
7991................................  Physical Fitness Facilities...........  $5.0                              
7993................................  Coin-Operated Amusement Devices.......  $5.0                              
7996................................  Amusement Parks.......................  $5.0                              
7997................................  Membership Sports and Recreation Clubs  $5.0                              
7999................................  Amusement and Recreation Services,      $5.0                              
                                       N.E.C..                                                                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                         Major Group 80--Health Services                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8011................................  Offices and Clinics of Doctors of       $5.0                              
                                       Medicine.                                                                
8021................................  Offices and Clinics of Dentists.......  $5.0                              
8031................................  Offices and Clinics of Doctors of       $5.0                              
                                       Osteopathy.                                                              
8041................................  Offices and Clinics of Chiropractors..  $5.0                              
8042................................  Offices and Clinics of Optometrists...  $5.0                              
8043................................  Offices and Clinics of Podiatrists....  $5.0                              
8049................................  Offices and Clinics of Health           $5.0                              
                                       Practitioners, N.E.C.                                                    
8051................................  Skilled Nursing Care Facilities.......  $5.0                              
8052................................  Intermediate Care Facilities..........  $5.0                              
8059................................  Nursing and Personal Care Facilities,   $5.0                              
                                       N.E.C.                                                                   
8062................................  General Medical and Surgical Hospitals  $5.0                              
8063................................  Psychiatric Hospitals.................  $5.0                              
8069................................  Specialty Hospitals, Except             $5.0                              
                                       Psychiatric.                                                             
8071................................  Medical Laboratories..................  $5.0                              
8072................................  Dental Laboratories...................  $5.0                              
8082................................  Home Health Care Services.............  $5.0                              
8092................................  Kidney Dialysis Centers...............  $5.0                              
8093................................  Specialty Outpatient Facilities,        $5.0                              
                                       N.E.C..                                                                  
8099................................  Health and Allied Services, N.E.C.....  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                         Major Group 81--Legal Services                                         
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8111................................  Legal Services........................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                      Major Group 82--Educational Services                                      
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8211................................  Elementary and Secondary Schools......  $5.0                              
8221................................  Colleges, Universities, and             $5.0                              
                                       Professional Schools.                                                    
8222................................  Junior Colleges and Technical           $5.0                              
                                       Institutes.                                                              
8231................................  Libraries.............................  $5.0                              
8243................................  Data Processing Schools...............  $5.0                              
8244................................  Business and Secretarial Schools......  $5.0                              
8249................................  Vocational Schools, N.E.C.............  $5.0                              
8299................................  Schools and Educational Services,       $5.0                              
                                       N.E.C..                                                                  
8299................................  Flight Training Services..............  $18.5                             
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                         Major Group 83--Social Services                                        
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8322................................  Individual and Family Social Services.  $5.0                              
8331................................  Job Training and Vocational             $5.0                              
                                       Rehabilitation Services.                                                 
8351................................  Child Day Care Services...............  $5.0                              
8361................................  Residential Care......................  $5.0                              
8399................................  Social Services, N.E.C................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                  Major Group 84--Museums, Art Galleries, and Botanical and Zoological Gardens                  
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8412................................  Museums and Art Galleries.............  $5.0                              
8422................................  Arboreta and Botanical or Zoological    $5.0                              
                                       Gardens.                                                                 
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                    Major Group 86--Membership Organizations                                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8611................................  Business Associations.................  $5.0                              

[[Page 31641]]

                                                                                                                
8621................................  Professional Membership Organizations.  $5.0                              
8631................................  Labor Unions and Similar Labor          $5.0                              
                                       Organizations.                                                           
8641................................  Civic, Social, and Fraternal            $5.0                              
                                       Associations.                                                            
8651................................  Political Organizations...............  $5.0                              
8661................................  Religious Organizations...............  $5.0                              
8699................................  Membership Organizations, N.E.C.......  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                     Major Group 87--Engineering, Accounting, Research, and Related Services                    
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8711................................  Engineering Services..................  $2.5                              
Except..............................  Military and Aerospace Equipment and    $20.0                             
                                       Military Weapons.                                                        
Except..............................  Contracts and Subcontracts for          $20.0                             
                                       Engineering Services Awarded Under                                       
                                       the National Energy Policy Act of                                        
                                       1992.                                                                    
Except..............................  Marine Engineering and Naval            $13.5                             
                                       Architecture.                                                            
8712................................  Architectural Services................  $2.5                              
8713................................  Surveying Services....................  $2.5                              
8721................................  Accounting, Auditing, and Bookkeeping   $6.0                              
                                       Services.                                                                
8731................................  Commercial Physical and Biological      500 \10\                          
                                       Research.                                                                
Except..............................  Aircraft..............................  1,500                             
Except..............................  Aircraft Parts, and Auxiliary           1,000                             
                                       Equipment, and Aircraft Engines and                                      
                                       Engine Parts.                                                            
Except..............................  Space Vehicles and Guided Missiles,     1,000                             
                                       their Propulsion Units, their                                            
                                       Propulsion Units Parts, and their                                        
                                       Auxiliary Equipment and Parts.                                           
8732................................  Commercial Economic, Sociological, and  $5.0                              
                                       Educational Research.                                                    
8733................................  Noncommercial Research Organizations..  $5.0                              
8734................................  Testing Laboratories..................  $5.0                              
8741................................  Management Services...................  $5.0                              
Except..............................  Conference Management Services........  $5.06                             
8742................................  Management Consulting Services........  $5.0                              
8743................................  Public Relations Services.............  $5.0                              
8744................................  Facilities Support Management Services  $5.0 \11\                         
Except..............................  Base Maintenance......................  $20.0 \12\                        
Except..............................  Environmental Remediation Services....  500 \13\                          
8748................................  Business Consulting Services, N.E.C...  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                               Major Group 89--Services, not Elsewhere Classified                               
                                                                                                                
----------------------------------------------------------------------------------------------------------------
8999................................  Services, N.E.C.......................  $5.0                              
                                                                                                                
----------------------------------------------------------------------------------------------------------------
                                   Division K--Nonclassifiable Establishments                                   
                                                                                                                
----------------------------------------------------------------------------------------------------------------
9999................................  Nonclassifiable Establishments........  $5.0                              
----------------------------------------------------------------------------------------------------------------
\1\ SIC code 1629--Dredging: To be considered small for purposes of Government procurement, a firm must perform 
  at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging 
  concern.                                                                                                      
\2\ SIC Division D--Manufacturing: For rebuilding machinery or equipment on a factory basis, or equivalent, use 
  the SIC code for a newly manufactured product. Concerns performing major rebuilding or overhaul activities do 
  not necessarily have to meet the criteria for being a ``manufacturer'' although the activities may be         
  classified under a manufacturing SIC code. Ordinary repair services or preservation are not considered        
  rebuilding.                                                                                                   
\3\ SIC code 2033: For purposes of Government procurement for food canning and preserving, the standard of 500  
  employees excludes agricultural labor as defined in 3306(k) of the Internal Revenue Code, 26 U.S.C. 3306(k).  
\4\ SIC code 2911: For purposes of Government procurement, the firm may not have more than 1,500 employees nor  
  more than 75,000 barrels per day capacity of petroleum-based inputs, including crude oil or bona fide         
  feedstocks. Capacity includes owned or leased facilities as well as facilities under a processing agreement or
  an arrangement such as an exchange agreement or a throughput. The total product to be delivered under the     
  contract must be at least 90 percent refined by the successful bidder from either crude oil or bona fide      
  feedstocks.                                                                                                   
\5\ SIC code 3011: For purposes of Government procurement, a firm is small for bidding on a contract for        
  pneumatic tires within Census Classification codes 30111 and 30112, provided that:                            
(1) The value of tires within Census Classification codes 30111 and 30112 which it manufactured in the United   
  States during the previous calendar year is more than 50 percent of the value of its total worldwide          
  manufacture,                                                                                                  
(2) the value of pneumatic tires within Census Classification codes 30111 and 30112 comprising its total        
  worldwide manufacture during the preceding calendar year was less than 5 percent of the value of all such     
  tires manufactured in the United States during that period, and                                               
(3) the value of the principal product which it manufactured or otherwise produced, or sold worldwide during the
  preceding calendar year is less than 10 percent of the total value of such products manufactured or otherwise 
  produced or sold in the United States during that period.                                                     
\6\ SIC codes 4724, 6531, 7311, 7312, 7313, 7319, and 8741 (part): As measured by total revenues, but excluding 
  funds received in trust for an unaffiliated third party, such as bookings or sales subject to commissions. The
  commissions received are included as revenue.                                                                 
\7\ A financial institution's assets are determined by averaging the assets reported on its four quarterly      
  financial statements for the preceding year.                                                                  
Assets for the purposes of this size standard means the assets defined according to the Federal Financial       
  Institutions Examination Council 034 call report form.                                                        
\8\ SIC code 6515: Leasing of building space to the Federal Government by Owners: For Government procurement, a 
  size standard of $15.0 million in gross receipts applies to the owners of building space leased to the Federal
  Government. The standard does not apply to an agent.                                                          
\9\ SIC codes 7699 and 3728: Contracts for the rebuilding or overhaul of aircraft ground support equipment on a 
  contract basis are classified under SIC code 3728.                                                            

[[Page 31642]]

                                                                                                                
\10\ SIC code 8731: For research and development contracts requiring the delivery of a manufactured product, the
  appropriate size standard is that of the manufacturing industry.                                              
(1) Research and Development means laboratory or other physical research and development. It does not include   
  economic, educational, engineering, operations, systems, or other nonphysical research; or computer           
  programming, data processing, commercial and/or medical laboratory testing.                                   
(2) For purposes of the Small Business Innovation Research (SBIR) program only, a different definition has been 
  established by law. See 121.701 of these regulations.                                                         
(3) Research and development for guided missiles and space vehicles includes evaluations and simulation, and    
  other services requiring thorough knowledge of complete missiles and spacecraft.                              
\11\ Facilities Management, a component of SIC code 8744, includes establishments, not elsewhere classified,    
  which provide overall management and the personnel to perform a variety of related support services in        
  operating a complete facility in or around a specific building, or within another business or Government      
  establishment. Facilities management means furnishing three or more personnel supply services which may       
  include, but are not limited to, secretarial services, typists, telephone answering, reproduction or          
  mimeograph service, mailing service, financial or business management, public relations, conference planning, 
  travel arrangements, word processing, maintaining files and/or libraries, switchboard operation, writers,     
  bookkeeping, minor office equipment maintenance and repair, or use of information systems (not programming).  
\12\ SIC code 8744: (1) If one of the activities of base maintenance, as defined below, can be identified with a
  separate industry and that activity (or industry) accounts for 50 percent or more of the value of an entire   
  contract, then the proper size standard is that of the particular industry, and not the base maintenance size 
  standard.                                                                                                     
(2) ``Base Maintenance'' requires the performance of three or more separate activities in the areas of service  
  or special trade construction industries. If services are performed, these activities must each be in a       
  separate SIC code including, but not limited to, Janitorial and Custodial Service, Fire Prevention Service,   
  Messenger Service, Commissary Service, Protective Guard Service, and Grounds Maintenance and Landscaping      
  Service. If the contract requires the use of special trade contractors (plumbing, painting, plastering,       
  carpentry, etc.), all such special trade construction activities are considered a single activity and         
  classified as Base Housing Maintenance. Since Base Housing Maintenance is only one activity, two additional   
  activities are required for a contract to be classified as ``Base Maintenance.''                              
\13\ SIC code 8744: (1) For SBA assistance as a small business concern in the industry of Environmental         
  Remediation Services, other than for Government procurement, a concern must be engaged primarily in furnishing
  a range of services for the remediation of a contaminated environment to an acceptable condition including,   
  but not limited to, preliminary assessment, site inspection, testing, remedial investigation, feasibility     
  studies, remedial design, containment, remedial action, removal of contaminated materials, storage of         
  contaminated materials and security and site closeouts. If one of such activities accounts for 50 percent or  
  more of a concern's total revenues, employees, or other related factors, the concern's primary industry is    
  that of the particular industry and not the Environmental Remediation Services Industry.                      
(2) For purposes of classifying a Government procurement as Environmental Remediation Services, the general     
  purpose of the procurement must be to restore a contaminated environment and also the procurement must be     
  composed of activities in three or more separate industries with separate SIC codes or, in some instances     
  (e.g., engineering), smaller sub-components of SIC codes with separate, distinct size standards. These        
  activities may include, but are not limited to, separate activities in industries such as: Heavy Construction;
  Special Trade Construction; Engineering Services; Architectural Services; Management Services; Refuse Systems;
  Sanitary Services, Not Elsewhere Classified; Local Trucking Without Storage; Testing Laboratories; and        
  Commercial, Physical and Biological Research. If any activity in the procurement can be identified with a     
  separate SIC code, or component of a code with a separate distinct size standard, and that industry accounts  
  for 50 percent or more of the value of the entire procurement, then the proper size standard is the one for   
  that particular industry, and not the Environmental Remediation Service size standard.                        

[FR Doc. 96-14523 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14522 Federal Acquisition Regulation; Predetermined Indirect Cost Rates
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31621-31622]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14522]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 16, 42, and 52

[FAC 90-39; FAR Case 94-011; Item VII]
RIN 9000-AG92

Federal Acquisition Regulation; Predetermined Indirect Cost Rates

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to implement revisions to OMB 
Circular A-21 that permit predetermined indirect cost rates for 
educational institutions to be established for periods of up to four 
years. This regulatory action was not subject to Office of Management 
and Budget review under Executive Order 12866, dated September 30, 
1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Ralph De Stefano at (202) 501-1758 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 94-011.

SUPPLEMENTARY INFORMATION:

A. Background

    On July 26, 1993, the Office of Management and Budget published 
revisions to OMB Circular A-21 (58 FR 39996) which include an increase 
in the period of time for which predetermined indirect cost rates for 
educational institutions may be applicable. The FAR is amended to 
permit use of predetermined indirect cost rates for educational 
institutions for periods of up to four years, in accordance with OMB 
circular A-21.

B. Regulatory Flexibility Act

    This final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comment is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected FAR subparts will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAC 90-39, FAR case 94-011), in correspondence.

C. Paperwork Reduction Act

    The final rule does not impose any additional information 
collection requirements which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq. However, a request 
for approval of an extension of the existing information collection 
requirement concerning 9000-0069, Indirect Cost Rates, is being 
submitted to the Office of Management and Budget under 44 U.S.C. 3501, 
et seq.

List of Subjects in 48 CFR Parts 16, 42, and 52

    Government procurement.

[[Page 31622]]

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Parts 16, 42, and 52 are amended as set forth 
below:
    1. The authority citation for 48 CFR Parts 16, 42, and 52 continues 
to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 16--TYPES OF CONTRACTS

    2. Section 16.307 is amended by adding a sentence to the end of 
paragraph (i) to read as follows:

16.307  Contract clauses.

* * * * *
    (i) * * * If the contract is a facilities contract, modify 
paragraph (c) by deleting the words ``Subpart 31.1'' and substituting 
for them ``section 31.106.''

PART 42--CONTRACT ADMINISTRATION

    3. Section 42.705-3 is amended by revising paragraphs (b)(4)(i) and 
(b)(6) to read as follows:

42.705-3  Educational institutions.

* * * * *
    (b) * * *
    (4)(i) If predetermined rates are to be used and no rates have been 
previously established for the institution's current fiscal year, the 
agency shall obtain from the institution a proposal for predetermined 
rates.
* * * * *
    (6) Predetermined indirect cost rates shall be applicable for a 
period of not more than four years. The agency shall obtain the 
contractor's proposal for new predetermined rates sufficiently in 
advance so that the new rates, based on current data, may be promptly 
negotiated near the beginning of the new fiscal year or other period 
agreed to by the parties (see paragraphs (b) and (d) of the clause at 
52.216-15, Predetermined Indirect Cost Rates).
* * * * *

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    4. Section 52.216-15 is amended by revising the introductory text 
and date of the clause; in the first sentence of paragraph (b) by 
removing the comma after the word ``year'' and adding ``(or other 
period specified in the Schedule),''; in the second sentence by 
revising the word ``rate'' to read ``rates'' and removing the period at 
the end of the sentence and inserting in its place ``or other period 
specified in the Schedule.''; in the third sentence by revising the 
word ``Negotiations'' to read ``Negotiation''; revising paragraph 
(d)(3); and in paragraph (g) by inserting after the word ``year'' the 
parenthetical ``(or other period specified in the Schedule)''. The 
revised text read as follows:

52.216-15  Predetermined Indirect Cost Rates.

    As prescribed in 16.307(i), insert the following clause:

PREDETERMINED INDIRECT COST RATES (AUG 1996)

* * * * *
    (d) * * *
    (3) the period for which the rates apply, and
* * * * *
[FR Doc. 96-14522 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14521 Federal Acquisition Regulation; Armed Services Pricing Manual
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31620-31621]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14521]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 15

[FAC 90-39; FAR Case 95-027; Item VI]
RIN 9000-AG97

Federal Acquisition Regulation; Armed Services Pricing Manual

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to replace the Armed Services 
Pricing Manual, as the reference guide for pricing and negotiation 
personnel, with five desk references jointly prepared by the Air Force 
Institute of Technology and the Federal Acquisition Institute.

[[Page 31621]]

This regulatory action was not subject to Office of Management and 
Budget review under Executive Order 12866, dated September 30, 1993, 
and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jeremy F. Olson at (202) 501-3221 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 95-027.

SUPPLEMENTARY INFORMATION:

A. Background

    This final rule amends FAR 15.805-1 to replace the Armed Services 
Pricing Manual, as the reference guide for pricing and negotiation 
personnel, with five desk references jointly prepared by the Air Force 
Institute of Technology and the Federal Acquisition Institute.

B. Regulatory Flexibility Act

    The final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comments is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected FAR subpart will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAC 90-39, FAR case 95-027), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 15

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
    Therefore, 48 CFR Part 15 is amended as set forth below:
    1. The authority citation for 48 CFR Part 15 continues to read as 
follows:

PART 15--CONTRACTING BY NEGOTIATION

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 15.805-1 is amended by revising paragraph (d) to read as 
follows:

15.805-1  General.

* * * * *
    (d) The Air Force Institute of Technology (AFIT) and the Federal 
Acquisition Institute (FAI) jointly prepared a series of five desk 
references to guide pricing and negotiation personnel. The five desk 
references are: Price Analysis, Cost Analysis, Quantitative Techniques 
for Contract Pricing, Advanced Issues in Contract Pricing, and Federal 
Contract Negotiation Techniques. The references provide detailed 
discussion and examples applying pricing policies to pricing problems. 
They are to be used for instruction and professional guidance. However, 
they are not directive and should be considered informational only. 
Copies of the desk references are available on CD-ROM which also 
contains the FAR, the FIRMR, the FTR and various other regulatory and 
training materials. The CD-ROM may be purchased by annual subscription 
(updated quarterly), or individually (reference ``List ID GSAFF,'' 
Stock No. 722-009-0000-2). The individual CD-ROMs or subscription to 
the CD-ROM may be purchased from the Superintendent of Documents, U.S. 
Government Printing Office, by telephone (202) 512-1800 or facsimile 
(202) 512-2550, or by mail order from the Superintendent of Documents, 
P.O. Box 371954, Pittsburgh, PA 15250-7954. Free copies of the desk 
references are available on the World Wide Web, Internet address: 
http://www.gsa.gov/staff/v/training.htm

[FR Doc. 96-14521 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14520 Federal Acquisition Regulation; Postponement of Bid Openings or Closing Dates
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31619-31620]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14520]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 14, 15, and 52

[FAC 90-39; FAR Case 91-095; Item V]
RIN 9000-AF48

Federal Acquisition Regulation; Postponement of Bid Openings or 
Closing Dates

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to clarify the time for 
receipt of bids or proposals when an emergency or unanticipated event 
interrupts normal processes at a Government installation on the date 
scheduled for receipt of bids or proposals. This regulatory action was 
not subject to Office of Management and Budget review under Executive 
Order 12866, dated September 30, 1993, and is not a major rule under 5 
U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Ralph De Stefano at (202) 501-1758 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 91-095.

SUPPLEMENTARY INFORMATION:

A. Background

    A proposed rule was published in the Federal Register on November 
9, 1993 (58 FR 59618). The proposed rule amended FAR 14.402-3, 15.411, 
15.412, 52.214-7, and 52.215-10 to clarify policy regarding 
rescheduling of the time for receipt of bids or proposals when an 
emergency or unanticipated event interrupts normal Government processes 
and urgent requirements do not allow time to formally extend the bid 
opening or solicitation closing date. One substantive comment was 
received in response to the proposed rule. After evaluation of this 
comment, the Councils agreed to finalize the amendments in the proposed 
rule and to make similar clarifying amendments at FAR 52.214-23, 
52.214-32, 52.214-33, and 52.215-36.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities under the Regulatory Flexibility Act, 5 U.S.C. 
601, et seq., because it merely clarifies policy regarding rescheduling 
of bid opening/solicitation closing dates when an emergency or 
unanticipated event occurs. No comments were received on the impact of 
this rule on small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 14, 15, and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
    Therefore, 48 CFR Parts 14, 15, and 52 are amended as set forth 
below:

    1. The authority citation for 48 CFR Parts 14, 15, and 52 continues 
to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 14--SEALED BIDDING

    2. Section 14.402-3 is amended by revising paragraph (c) to read as 
follows:

14.402-3  Postponement of openings.

* * * * *
    (c) In the case of paragraph (a)(2) of this section, and when 
urgent Government requirements preclude amendment of the solicitation 
as prescribed in 14.208, the time specified for opening of bids will be 
deemed to be extended to the same time of day specified in the 
solicitation on the first work day on which normal Government processes 
resume. In such cases, the time of actual bid opening shall be deemed 
to be the time set for bid opening for the purpose of determining 
``late bids'' under 14.304. A note should be made on the abstract of 
bids or otherwise added to the file explaining the circumstances of the 
postponement.

PART 15--CONTRACTING BY NEGOTIATION

    3. Section 15.411 is amended by revising paragraph (a) to read as 
follows:

15.411  Receipt of proposals and quotations.

    (a) The procedures for receipt and handling of proposals and 
quotations should be similar to those prescribed in 14.401. Proposals 
and quotations shall be marked with the date and time of receipt.
* * * * *
    4. Section 15.412 is amended by revising paragraph (b) to read as 
follows:

15.412  Late proposals, modifications, and withdrawals of proposals.

* * * * *
    (b) Offerors are responsible for submitting offers, and any 
modifications to them, so as to reach the Government office designated 
in the solicitation on time. If an emergency or unanticipated event 
interrupts normal Government processes so that proposals cannot be 
received at the office designated for receipt of proposals by the exact 
time specified in the solicitation, and urgent Government requirements 
preclude amendment of the solicitation closing date as usually 
prescribed by 15.410, the

[[Page 31620]]

time specified for receipt of proposals will be deemed to be extended 
to the same time of day specified in the solicitation on the first work 
day on which normal Government processes resume. If no time is 
specified in the solicitation, the time for receipt is 4:30 p.m., local 
time, for the designated Government office on the date that proposals 
are due.
* * * * *

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    5. Section 52.214-7 is amended in the provision by revising the 
date in the heading and adding paragraph (h) to read as follows:

52.214-7  Late Submissions, Modifications, and Withdrawals of Bids.

* * * * *

Late Submissions, Modifications, and Withdrawals of Bids (Aug 1996)

* * * * *
    (h) If an emergency or unanticipated event interrupts normal 
Government processes so as to cause postponement of the scheduled 
bid opening, and urgent Government requirements preclude amendment 
of the solicitation or other notice of an extension of the opening 
date, the time specified for receipt of bids will be deemed to be 
extended to the same time of day specified in the solicitation on 
the first work day on which normal Government processes resume.

(End of provision)

    6. Section 52.214-23 is amended in the provision by revising the 
date in the heading and adding paragraph (g) to read as follows:

52.214-23  Late Submissions, Modifications, and Withdrawals of 
Technical Proposals Under Two-Step Sealed Bidding.

* * * * *

Late Submissions, Modifications, and Withdrawals of Technical Proposals 
Under Two-Step Sealed Bidding (Aug 1996)

* * * * *
    (g) If an emergency or unanticipated event interrupts normal 
Government processes so that technical proposals cannot be received 
at the office designated for receipt of technical proposals by the 
exact time specified in the solicitation, and urgent Government 
requirements preclude amendment of the solicitation or other notice 
of an extension of the closing date, the time specified for receipt 
of technical proposals will be deemed to be extended to the same 
time of day specified in the solicitation on the first work day on 
which normal Government processes resume. If no time is specified in 
the solicitation, the time for receipt is 4:30 p.m., local time, for 
the designated Government office.

(End of provision)

    7. Section 52.214-32 is amended in the provision by revising the 
date in the heading and adding paragraph (f) to read as follows:

52.214-32  Late Submissions, Modifications, and Withdrawals of Bids 
(Overseas).

* * * * *

Late Submissions, Modifications, and Withdrawals of Bids (Overseas) 
(Aug 1996)

* * * * *
    (f) If an emergency or unanticipated event interrupts normal 
Government processes so as to cause postponement of the scheduled 
bid opening, and urgent Government requirements preclude amendment 
of the solicitation or other notice of an extension of the opening 
date, the time specified for receipt of bids will be deemed to be 
extended to the same time of day specified in the solicitation on 
the first work day on which normal Government processes resume.

(End of provision)

    8. Section 52.214-33 is amended in the provision by revising the 
date in the heading and adding paragraph (e) to read as follows:

52.214-33  Late Submissions, Modifications, and Withdrawals of 
Technical Proposals Under Two-Step Sealed Bidding (Overseas).

* * * * *

Late Submissions, Modifications, and Withdrawals of Technical Proposals 
Under Two-Step Sealed Bidding (Overseas) (Aug 1996)

* * * * *
    (e) If an emergency or unanticipated event interrupts normal 
Government processes so that technical proposals cannot be received 
at the office designated for receipt of technical proposals by the 
exact time specified in the solicitation, and urgent Government 
requirements preclude amendment of the solicitation or other notice 
of an extension of the closing date, the time specified for receipt 
of technical proposals will be deemed to be extended to the same 
time of day specified in the solicitation on the first work day on 
which normal Government processes resume. If no time is specified in 
the solicitation, the time for receipt is 4:30 p.m., local time, for 
the designated Government office.

(End of provision)

    9. Section 52.215-10 is amended by revising the date in the heading 
of the provision, and adding paragraph (i) to read as follows:

52.215-10  Late Submissions, Modifications, and Withdrawals of 
Proposals.

* * * * *

Late Submissions, Modifications, and Withdrawals of Proposals (Aug 
1996)

* * * * *
    (i) If an emergency or unanticipated event interrupts normal 
Government processes so that proposals cannot be received at the 
office designated for receipt of proposals by the exact time 
specified in the solicitation, and urgent Government requirements 
preclude amendment of the solicitation or other notice of an 
extension of the closing date, the time specified for receipt of 
proposals will be deemed to be extended to the same time of day 
specified in the solicitation on the first work day on which normal 
Government processes resume. If no time is specified in the 
solicitation, the time for receipt is 4:30 p.m., local time, for the 
designated Government office.

(End of provision)

    10. Section 52.215-36 is amended by revising the date in the 
heading of the provision, and adding paragraph (g) to read as follows:

52.215-36  Late Submissions, Modifications, and Withdrawals of 
Proposals (Overseas).

* * * * *

Late Submissions, Modifications, and Withdrawals of Proposals 
(Overseas) (Aug 1996)

* * * * *
    (g) If an emergency or unanticipated event interrupts normal 
Government processes so that proposals cannot be received at the 
office designated for receipt of proposals by the exact time 
specified in the solicitation, and urgent Government requirements 
preclude amendment of the solicitation or other notice of an 
extension of the closing date, the time specified for receipt of 
proposals will be deemed to be extended to the same time of day 
specified in the solicitation on the first work day on which normal 
Government processes resume. If no time is specified in the 
solicitation, the time for receipt is 4:30 p.m., local time, for the 
designated Government office.

(End of provision)

[FR Doc. 96-14520 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14519 Federal Acquisition Regulation; Implementation of Memorandum of Understanding Between the United States of America and the European Economic Community on Government Procurement and Sanctions Imposed on the European Community
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31618-31619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14519]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 14, 15, 17, 25, and 52

[FAC 90-39; FAR Case 93-606; Item IV]
RIN 9000-AF39

Federal Acquisition Regulation; Implementation of Memorandum of 
Understanding Between the United States of America and the European 
Economic Community on Government Procurement and Sanctions Imposed on 
the European Community

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to implement the Memorandum of 
Understanding Between the United States of America and the European 
Economic Community on Government Procurement (MOU) and to implement the 
sanctions imposed by the President on the European community (EC) 
prohibiting the award of certain contracts for EC products, services, 
and construction. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993, and is not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Peter O'Such at (202) 501-1759 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 93-606.

SUPPLEMENTARY INFORMATION:

A. Background

    An interim rule was published in the Federal Register on May 28, 
1993 (58 FR 31140) (FAC 90-18). Revisions based on the analysis of 
public comments were incorporated in the interim rule published in FAC 
90-19 as part of the implementation of the North American Free Trade 
Agreement Implementation Act (FAR case 93-310) (59 FR 544, January 5, 
1994). The rule was further amended by an interim rule published in FAC 
90-36 to implement the Uruguay Round Agreement Act (FAR case 95-304) 
(60 FR 67514, December 29, 1995).

B. Regulatory Flexibility Act

    The Regulatory Flexibility Act, 5 U.S.C. 601, et seq., applies to 
this final

[[Page 31619]]

rule, and a Final Regulatory Flexibility Analysis has been performed. A 
copy of the analysis may be obtained from the FAR Secretariat.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 14, 15, 17, 25, and 52

    Government procurement.

Interim Rule Adopted as Final

    Accordingly, the interim rule amending 48 CFR Parts 14, 15, 17, 25, 
and 52, which was published at 58 FR 31140, May 28, 1993, and amended 
at 59 FR 544, January 5, 1994, and 60 FR 67514, December 29, 1995, is 
adopted as final without further change.
    The authority citation for 48 CFR Parts 14, 15, 17, 25, and 52 
continues to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
[FR Doc. 96-14519 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14518 Federal Acquisition Regulation; Justification and Approval Thresholds
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31617-31618]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14518]

-----------------------------------------------------------------------

[[Page 31618]]

DEPARTMENT OF DEFENSE
48 CFR Part 6

[FAC 90-39; FAR Case 96-302; Item III]
RIN 9000-AH00

Federal Acquisition Regulation; Justification and Approval 
Thresholds

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to raise the dollar thresholds 
pertaining to approval for the use of other than full and open 
competition in the acquisition process. This regulatory action was not 
subject to Office of Management and Budget review under Executive Order 
12866, dated September 30, 1993, and is not a major rule under 5 U.S.C. 
804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Ralph De Stefano at (202) 501-1758 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 96-302.

SUPPLEMENTARY INFORMATION:

A. Background

    Section 4102 of the Fiscal Year 1996 Defense Authorization Act 
(Public Law 104-106) amends 10 U.S.C. 2304(f)(1)(B) and 41 U.S.C. 
253(f)(1)(B) to raise the dollar thresholds at which approval for the 
use of other than full and open competition must be obtained from the 
competition advocate, the head of the procuring activity, or the senior 
procurement executive. Section 4102 provides for approval of the 
justification for other than full and open competition by (1) the 
competition advocate, for proposed contracts over $500,000, but not 
exceeding $10,000,000; (2) the head of the procuring activity, or 
designee, for proposed contracts over $10,000,000, but not exceeding 
$50,000,000; and (3) the senior procurement executive, for proposed 
contracts over $50,000,000.

B. Regulatory Flexibility Act

    The final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comments is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected subpart will be considered in accordance with 5 
U.S.C. 610. Such comments must be submitted separately and cite 5 
U.S.C. 601, et seq. (FAC 90-39, FAR case 96-302), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Part 6

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Part 6 is amended as set forth below:

PART 6--COMPETITION REQUIREMENTS

    1. The authority citation for 48 CFR Part 6 continues to read as 
follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

    2. Section 6.304 is amended in paragraph (a)(1) by revising 
``$100,000'' to read ``$500,000''; in (a)(2) by revising ``$100,000'' 
to read ``$500,000'' and ``$1,000,000'' to read ``$10,000,000''; in 
(a)(3) introductory text by revising ``$1,000,000'' to read 
``$10,000,000'' and ``$10,000,000'' to read ``$50,000,000''; and 
revising (a)(4) to read as follows:

6.304   Approval of the justification.

    (a) * * *
    (4) For a proposed contract over $50,000,000, by the senior 
procurement executive of the agency designated pursuant to the OFPP Act 
(41 U.S.C. 414(3)) in accordance with agency procedures. This authority 
is not delegable except in the case of the Under Secretary of Defense 
(Acquisition and Technology), acting as the senior procurement 
executive for the Department of Defense.
* * * * *
[FR Doc. 96-14518 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14517 Federal Acquisition Regulation; National Industrial Security Program Operating Manual (NISPOM)
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Page 31617]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14517]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 4, 27, and 52

[FAC 90-39; FAR Case 95-004; Item II]
RIN 9000-AG95

Federal Acquisition Regulation; National Industrial Security 
Program Operating Manual (NISPOM)

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed on a final rule to amend 
the Federal Acquisition Regulation (FAR) to reflect the applicability 
of the National Industrial Security Program Operating Manual (NISPOM). 
The NISPOM updates and replaces the DOD Industrial Security Manual for 
Safeguarding Classified Information (DOD 5220.22-M). This regulatory 
action was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993, and is not a major 
rule under 5 U.S.C. 804.

EFFECTIVE DATE: August 19, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Jack O'Neill at (202) 501-3856 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 95-004.

SUPPLEMENTARY INFORMATION:

A. Background

    The National Industrial Security Program was established by 
Executive Order 12829, ``National Industrial Security Program'' (58 FR 
3479). Section 201 of the Executive order directs the Secretary of 
Defense, in consultation with all affected agencies and with the 
concurrence of the Secretary of Energy, the Chairman of the Nuclear 
Regulatory Commission, and the Director of Central Intelligence, to 
issue and maintain a National Industrial Security Program Operating 
Manual.

B. Regulatory Flexibility Act

    This final rule does not constitute a significant FAR revision 
within the meaning of FAR 1.501 and Public Law 98-577, and publication 
for public comment is not required. Therefore, the Regulatory 
Flexibility Act does not apply. However, comments from small entities 
concerning the affected FAR subparts will be considered in accordance 
with 5 U.S.C. 610. Such comments must be submitted separately and cite 
5 U.S.C. 601, et seq. (FAC 90-39, FAR case 95-004), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 4, 27, and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, 48 CFR Parts 4, 27, and 52 are amended as set forth 
below:
    1. The authority citation for 48 CFR Parts 4, 27, and 52 continues 
to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 4--ADMINISTRATIVE MATTERS

    2. Section 4.402 is amended by revising paragraphs (a) and (b); and 
in paragraph (c) by removing ``Section VIII of the ISR'' and inserting 
in its place ``Chapter 10 of the NISPOM''. The revised text reads as 
follows:

4.402  General.

    (a) Executive Order 12829, January 6, 1993 (58 FR 3479, January 8, 
1993), entitled ``National Industrial Security Program'' (NISP), 
establishes a program to safeguard Federal Government classified 
information that is released to contractors, licensees, and grantees of 
the United States Government. Executive Order 12829 amends Executive 
Order 10865, February 20, 1960 (25 FR 1583, February 25, 1960), 
entitled ``Safeguarding Classified Information Within Industry,'' as 
amended by Executive Order 10909, January 17, 1961 (26 FR 508, January 
20, 1961).
    (b) The National Industrial Security Program Operating Manual 
(NISPOM) incorporates the requirements of these Executive Orders. The 
Secretary of Defense, in consultation with all affected agencies and 
with the concurrence of the Secretary of Energy, the Chairman of the 
Nuclear Regulatory Commission, and the Director of Central 
Intelligence, is responsible for issuance and maintenance of this 
Manual. The following DOD publications implement the program:
    (1) National Industrial Security Program Operating Manual (NISPOM) 
(DOD 5220.22-M).
    (2) Industrial Security Regulation (ISR) (DOD 5220.22-R).
* * * * *

4.403 and 4.404  [Amended]

    3. Section 4.403 is amended in paragraphs (a)(1)(i), (b)(1), 
(c)(1), and (c)(2), by revising ``DISP'' to read ``NISP''; and section 
4.403(c)(1) is amended in the last sentence by removing ``Section VII 
of''.
    3a. Section 4.404(d) is amended by revising ``DISP'' to read 
``NISP''.

PART 27--PATENTS, DATA, AND COPYRIGHTS

27.207-1  [Amended]

    4. Section 27.207-1 is amended in the second sentence of paragraph 
(b) by removing ``Department of Defense Industrial Security Manual for 
Safeguarding Classified Security Information'' and inserting in its 
place ``National Industrial Security Program Operating Manual''.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

52.204-2  [Amended]

    5. Section 52.204-2 is amended by revising the introductory 
paragraph to read as set forth below; by revising the date of the 
clause to read ``(AUG 1996)''; and in paragraph (b)(1) of the clause by 
removing ``Department of Defense Industrial Security Manual for 
Safeguarding Classified Information'' and inserting in its place 
``National Industrial Security Program Operating Manual''. The revised 
text reads as follows:

52.204-2  Security requirements.

    As prescribed in 4.404(a), insert the following clauses:
* * * * *
[FR Doc. 96-14517 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14516 Federal Acquisition Regulation; Double-Sided Copying
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31616-31617]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14516]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Parts 4 and 52

[FAC 90-39; FAR Case 92-050; Item I]
RIN 9000-AG41

Federal Acquisition Regulation; Double-Sided Copying

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Interim rule adopted as final with changes.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council have agreed to a final rule which 
amends the Federal Acquisition Regulation (FAR) to encourage 
contractors to maximize the use of double-sided copying on recycled 
paper when submitting written documents related to an acquisition. This 
regulatory action was not subject to Office of Management and Budget 
review under Executive Order 12866, dated September 30, 1993, and is 
not a major rule under 5 U.S.C. 804.

EFFECTIVE DATE: June 20, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Ralph De Stefano at (202) 501-1758 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAC 90-39, FAR case 92-050.

SUPPLEMENTARY INFORMATION:

A. Background

    These revisions are based on a portion of Executive Order 12873, 
Federal Acquisition, Recycling, and Waste Prevention, dated October 20, 
1993 (58 FR 54911), which encourages the use of double-sided copying on 
recycled paper for documents printed within the Government and under 
Government contracts.
    An interim rule was published in the Federal Register at 60 FR 
28493, May 31, 1995, as Item I, FAC 90-27. This interim rule amended 
FAR Part 4 to add a new subpart 4.3--Paper Documents, and amended FAR 
Part 52 to add a clause at 52.204-4, Printing/Copying Double-Sided on 
Recycled Paper. An additional amendment to section 4.304 was published 
at 60 FR 34744 on July 3, 1995, to eliminate the requirement for use of 
the clause at 52.204-4 in solicitations and contracts valued at or 
below the simplified acquisition threshold. Further amendments have 
been made in the final rule to implement Executive Order 12995 of March 
25, 1996 (61 FR 13645, March 28, 1996), which amended Executive Order 
12873 to revise the minimum content standards for printing and writing 
paper.
    Seven comments from six sources were received in response to the 
interim rule. All comments were considered in developing the final 
rule.

B. Regulatory Flexibility Act

    The Department of Defense, the General Services Administration, and 
the National Aeronautics and Space Administration certify that this 
final rule will not have a significant economic impact on a substantial 
number of small entities under the Regulatory Flexibility Act, 5 U.S.C. 
601, et seq., because the rule contains no mandatory requirements for 
offerors or contractors. The rule encourages, but does not require, the 
use of double-sided copying on recycled paper when submitting written 
documents to the Government. No comments were received on the impact of 
this rule on small entities during the public comment period.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to 
the FAR do not impose recordkeeping or information collection 
requirements, or collections of information from offerors, contractors, 
or members of the public which require the approval of the Office of 
Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 4 and 52

    Government procurement.

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

Interim Rule Adopted as Final With Changes

    Accordingly, the interim rule amending CFR Parts 4 and 52, which 
was published at 60 FR 28493, May 31, 1995 (FAC 90-27, Item I), and 
amended at 60 FR 34744, July 3, 1995, is adopted as a final rule with 
amendments at sections 4.301 and 52.204-4.
    1. The authority citation for 48 CFR Parts 4 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 4--ADMINISTRATIVE MATTERS

4.301  [Amended]

    2. Section 4.301 is amended by removing the period at the end of 
the sentence and inserting in its place ``, as amended by Executive 
Order 12995, March 25, 1996.''

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    3. Section 52.204-4 is amended by revising the date of the clause 
to read ``(JUN 1996)''; in paragraph (a) of the clause by inserting 
after ``October 20, 1993,'' the phrase ``as amended by Executive Order 
12995, dated March 25, 1996,''; revising ``20%'' to read ``20 
percent''; and by revising paragraph (b) to read as follows:

52.204-4  Printing/Copying Double-Sided on Recycled Paper.

* * * * *

PRINTING/COPYING DOUBLE-SIDED RECYCLED PAPER (JUN 1996)

* * * * *
    (b) The 20 percent standard applies to high-speed copier paper, 
offset paper, forms

[[Page 31617]]

bond, computer printout paper, carbonless paper, file folders, white 
woven envelopes, and other uncoated printed and writing paper, such 
as writing and office paper, book paper, cotton fiber paper, and 
cover stock. An alternative to meeting the 20 percent postconsumer 
material standard is 50 percent recovered material content of 
certain industrial by-products.

(End of clause)

[FR Doc. 96-14516 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-14515 Federal Acquisition Circular 90-39 Introduction
[Federal Register Volume 61, Number 120 (Thursday, June 20, 1996)]
[Rules and Regulations]
[Pages 31612-31616]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-14515]

[[Page 31611]]

_______________________________________________________________________

Part II

Department of Defense

General Services Administration

National Aeronautics and Space Administration
_______________________________________________________________________

48 CFR Ch. 1

Federal Acquisition Regulation (FAR); Final Rules

Federal Register / Vol. 61, No. 120 / Thursday, June 20, 1996 / Rules 
and Regulations

[[Page 31612]]

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Chapter 1

Federal Acquisition Circular 90-39 Introduction

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Summary presentation of final and interim rules with request 
for comment.

-----------------------------------------------------------------------

SUMMARY: This document summarizes the Federal Acquisition Regulation 
(FAR) rules which follow it in the order listed below. The Civilian 
Agency Acquisition Council and the Defense Acquisition Regulations 
Council are issuing Federal Acquisition Circular (FAC) 90-39 to amend 
the FAR.

DATES: For effective dates and comment dates, see separate documents 
which follow. Please cite FAC 90-39 and the appropriate FAR case 
number(s) in all correspondence related to the following documents.

FOR FURTHER INFORMATION CONTACT: The analyst whose name appears (in the 
table below) in relation to each FAR case or subject area. For general 
information, contact the FAR Secretariat, Room 4037, GS Building, 
Washington, DC 20405, (202) 501-4755. Please cite FAC 90-39 and 
specific FAR case number(s).

SUPPLEMENTARY INFORMATION: Federal Acquisition Circular 90-39 amends 
the Federal Acquisition Regulation (FAR) as specified below:

------------------------------------------------------------------------
   Item-             Subject-             FAR case-          Analyst    
------------------------------------------------------------------------
I-.........  Double-Sided Copying-..           92-050-  De Stefano. -   
II-........  National Industrial               95-004-  O'Neill. -      
              Security Program                                          
              Operating Manual                                          
              (NISPOM) -.                                               
III-.......  Justification and                 96-302-  De Stefano. -   
              Approval Thresholds-.                                     
IV-........  Implementation of                 93-606-  O'Such. -       
              Memorandum of                                             
              Understanding Between                                     
              the United States of                                      
              America and the                                           
              European Economic                                         
              Community on                                              
              Government Procurement                                    
              and Sanctions Imposed                                     
              on the European                                           
              Community -.                                              
V-.........  Postponement of Bid               91-095-  De Stefano.     
              Openings or Closing                                       
              Dates.                                                    
VI-........  Armed Services Pricing            95-027-  Olson. -        
              Manual-.                                                  
VII-.......  Predetermined Indirect            94-011-  De Stefano. -   
              Cost Rates-.                                              
VIII-......  Small Business Size               94-600-  Klein. -        
              Standards-.                                               
IX-........  Master Subcontracting             92-039-  Klein. -        
              Plans-.                                                   
X-.........  Small Business                    92-302-  Klein. -        
              Competitiveness                                           
              Demonstration Program -                                   
              .                                                         
XI-........  Use of Convict Labor-..           93-615-  O'Neill.        
XII-.......  Ozone Executive Order-.           93-307-  De Stefano.     
XIII-......  Uruguay Round (1996               95-304-  O'Such. -       
              Code) -.                                                  
XIV-.......  Implementation of the             93-310-  O'Such. -       
              North American Free                                       
              Trade Agreement                                           
              Implementation Act -.                                     
XV-........  Caribbean Basin                   95-030-  O'Such. -       
              Countries -.                                              
XVI-.......  Fluctuating Exchange              92-048-  O'Such. -       
              Rates-.                                                   
XVII-......  Irrevocable Letters of            95-301-  O'Neill. -      
              Credit and                                                
              Alternatives to Miller                                    
              Act Bonds-.                                               
XVIII-.....  Part 31 Agency                    94-606-  Olson. -        
              Supplements -.                                            
XIX-.......  Records Retention-.....           93-020-  Olson.          
XX-........  Legislative Lobbying              93-006-  Olson. -        
              Costs -.                                                  
XXI-.......  Travel Costs-..........           93-022-  Olson           
XXII-......  Prompt Payment Overseas           92-046-  Olson. -        
              -.                                                        
XXIII-.....  Alternate Dispute          91-062/92-301-  O'Neill. --     
              Resolution/Federal                                        
              Courts Administration                                     
              Act -.                                                    
XXIV-......  Defense Production Act            93-304-  O'Neill. -      
              Amendments-.                                              
XXV-.......  Child Care Services-...           91-106-  Klein.          
XXVI-......  Quick-Closeout                    95-009-  Klein. -        
              Procedures-.                                              
XXVII-.....  Quality Assurance                 92-031-  Klein. -        
              Actions--Electronic -                                     
              Screening-.                                               
XXVIII-....  Quality Assurance                 92-027-  Klein. -        
              Nonconformances -.                                        
XXIX-......  Solicitation                      95-603-  O'Neill.        
              Provisions--Contract                                      
              Clauses-.                                                 
XXX-.......  Contract Award--Sealed            91-031-  O'Neill. -      
              Bidding--Construction -                                   
              .                                                         
XXXI-......  Small Business                    93-305-  O'Neill. -      
              Innovation Research                                       
              Rights in Data -.                                         
XXXII-.....  Inspection Clauses--              92-001-  Klein -         
              Fixed Price.                                              
XXXIII-....  Termination for                   91-102-  Klein. -        
              Convenience -.                                            
N/A-.......  Corrections and                                            
              Technical Amendments                                      
             (1) Revision to FAR               92-617-  O'Such. -       
              Utility Matrix (Loose-                                    
              leaf edition only) -.                                     
             (2) Table of Standard                N/A-  N/A.            
              Forms and OMB                                             
              Expiration Dates -.                                       
------------------------------------------------------------------------

 -Item I--Double-Sided Copying (FAR Case 92-050)

    The interim rule published as Item I of FAC 90-27, and amended by 
Item III of FAC 90-29, is revised and finalized. The interim rule added 
FAR Subpart 4.3 and a clause at 52.204-4 to encourage offerors and 
contractors to maximize the use of double-sided copying on recycled 
paper, in accordance with Executive Order 12873. FAC 90-29 amended FAR 
4.304 to eliminate the requirement for use of the clause at 52.204-4 in 
acquisitions at or below the simplified acquisition threshold. The 
final rule contains additional changes at 4.301 and 52.204-4 to 
implement Executive Order 12995, which amended Executive Order 12873 to 
revise the minimum recycled content standards for printing and writing 
paper.

[[Page 31613]]

Item II--National Industrial Security Program Operating Manual 
(NISPOM) (FAR Case 95-004)

    This final rule amends FAR Subparts 4.4 and 27.2 and the clause at 
52.204-2 to (1) replace references to the ``Defense Industrial Security 
Program'' with references to the ``National Industrial Security 
Program''; and (2) replace references to the ``DoD Industrial Security 
Manual for Safeguarding Classified Information'' with references to the 
``National Industrial Security Program Operating Manual.'' The National 
Industrial Security Program has been established in accordance with 
Executive Order 12829.

Item III--Justification and Approval Thresholds (FAR Case 96-302)

    This final rule amends FAR 6.304 to implement Section 4102 of the 
Fiscal Year 1996 Defense Authorization Act (Public Law 104-106). 
Section 4102 amends 10 U.S.C. 2304(f)(1)(B) and 41 U.S.C. 253(f)(1)(B) 
to raise the dollar thresholds at which approval for the use of other 
than full and open competition must be obtained from the competition 
advocate, the head of the procuring activity, or the senior procurement 
executive. Section 4102 provides for approval of the justification for 
other than full and open competition by (1) the competition advocate, 
for proposed contracts over $500,000, but not exceeding $10,000,000; 
(2) the head of the procuring activity, or designee, for proposed 
contracts over $10,000,000, but not exceeding $50,000,000; and (3) the 
senior procurement executive, for proposed contracts over $50,000,000.

Item IV--Implementation of Memorandum of Understanding Between the 
United States of America and the European Economic Community on 
Government Procurement and Sanctions Imposed on the European Community 
(FAR Case 93-606)

    The interim rule published in FAC 90-18, and amended in FACs 90-19 
and 90-36, is converted to a final rule without change. The rule 
amended FAR Parts 14, 15, 17, 25, and 52 to (1) implement Executive 
Order 12849 which, based on a Memorandum of Understanding between the 
United States and the European Community, waives the Buy American Act 
in certain situations; and (2) implement certain trade sanctions 
imposed on the European Community.

Item V--Postponement of Bid Openings or Closing Dates (FAR Case 91-
095)

    This final rule amends FAR 14.402-3, and 15.412 and the provisions 
at 52.214-7, 52.214-23, 52.214-32, 52.214-33, 52.215-10, and 52.215-36 
to clarify policy regarding rescheduling of the time for receipt of 
bids or proposals when an emergency or unanticipated event interrupts 
normal processes at a Government installation. An editorial revision is 
made at 15.411(a).

Item VI--Armed Services Pricing Manual (FAR Case 95-027)

    This final rule amends FAR 15.805-1 to replace the Armed Services 
Pricing Manual, as the reference guide for pricing and negotiation 
personnel, with five desk references jointly prepared by the Air Force 
Institute of Technology and the Federal Acquisition Institute.

Item VII--Predetermined Indirect Cost Rates (FAR Case 94-011)

    This final rule amends FAR 42.705-3 and the clause at 52.216-15 to 
implement revisions to OMB Circular A-21 that permit predetermined 
indirect cost rates for educational institutions to be established for 
periods of up to four years. An editorial revision is made at 
16.307(i).

Item VIII--Small Business Size Standards (FAR Case 94-600)

    This final rule revises the table at FAR 19.102 to reflect size 
standards published by the Small Business Administration.

Item IX--Master Subcontracting Plans (FAR Case 92-039)

    This final rule amends FAR 19.704 and the clause at 52.219-9 to 
permit master subcontracting plans to be written for a three-year 
period, and to emphasize that it is incumbent upon contractors to 
maintain and update master plans.

Item X--Small Business Competitiveness Demonstration Program (FAR 
Case 92-302)

    The interim rule published as Item XIII of FAC 90-23 is converted 
to a final rule without change. The rule amended FAR Subpart 19.10 to 
(1) extend the Small Business Competitiveness Demonstration Program 
through September 30, 1996; (2) specify that agencies may reinstate the 
use of small business set-asides as necessary to meet assigned goals, 
but only within the organizational unit(s) that failed to meet the 
small business goals; and (3) revise the description of architectural 
and engineering services as a designated industry group.

Item XI--Use of Convict Labor (FAR Case 93-615)

    This final rule amends FAR Subpart 22.2 and the clause at 52.222-3 
to reflect changes in the statutory restrictions on employment of 
convict labor in the performance of Government contracts. The 
amendments (1) remove all references to 18 U.S.C. 4082(c)(2), which now 
only applies to offenses committed prior to November 1, 1987; (2) 
reflect the addition of the Commonwealth of the Northern Mariana 
Islands to the jurisdictions covered by Executive Order 11755; and (3) 
include further information regarding the requirements of Executive 
Order 11755, as amended by Executive Order 12608.

Item XII--Ozone Executive Order (FAR Case 93-307)

    The interim rule published as Item III of FAC 90-27 is revised and 
finalized. The rule implements Executive Order 12843 and Environmental 
Protection Agency Clean Air Act regulations (40 CFR Part 82). The final 
rule differs from the interim rule in that it (1) amends FAR Subpart 
23.8 and the clause at 52.223-11 to replace the definitions of ``class 
I substance'' and ``class II substance'' with a definition of ``ozone-
depleting substance''; and (2) amends the clause at 52.223-11 to 
clarify that labeling of ozone-depleting substances shall be in 
accordance with 42 U.S.C. 7671j and 40 CFR Part 82.

Item XIII--Uruguay Round (1996 Code) (FAR Case 95-304)

    The interim rule published in FAC 90-36 is converted to a final 
rule without further change. The rule amends FAR Parts 25 and 52 to 
implement the renegotiated Government Procurement Agreement (1996 Code) 
(Uruguay Round). This agreement is implemented in statute by the 
Uruguay Round Agreement Act, Public Law 103-465, which amends the Trade 
Agreements Act of 1979 (19 U.S.C. 2501-2582).

Item XIV--Implementation of the North American Free Trade Agreement 
Implementation Act (FAR Case 93-310)

    This interim rule amends the rule published in FAC 90-19 to 
implement the North American Free Trade Agreement (NAFTA) 
Implementation Act. This interim rule (1) adds language at FAR 
25.402(g) to address the applicability of NAFTA to the acquisition of 
services; (2) adds language at 27.208 to address the use of patented 
technology when the patent holder is from a NAFTA country; (3) amends 
the provision at 52.225- 20 to clarify procedures for evaluation of

[[Page 31614]]

offers; (4) adds an alternate to the provision at 52.225-20 and the 
clause at 52.225-21 for use in acquisitions between $25,000 and 
$50,000; and (5) adds a new clause at 52.225-22 for use in construction 
contracts awarded outside the United States with an estimated value of 
$6,500,000 or more.

Item XV--Caribbean Basin Countries (FAR Case 95-030)

    This final rule amends FAR 25.402(b) to reflect the U.S. Trade 
Representative's extension, through September 30, 1996, of the 
designation of Caribbean Basin products as eligible products under the 
Trade Agreements Act.

Item XVI--Fluctuating Exchange Rates (FAR Case 92-048)

    This final rule revises FAR 25.501 and adds a new provision at 
52.225-4 to address procedures for evaluation of offers priced in a 
foreign currency.

Item XVII--Irrevocable Letters of Credit and Alternatives to Miller Act 
Bonds (FAR Case 95-301)

    This interim rule amends FAR Part 28 and the clause at 52.228-2, 
and adds new clauses at 52.228-13 and 52.228-14 to (1) provide for use 
of irrevocable letters of credit as an alternative to corporate or 
individual sureties as security for Miller Act bonds on construction 
contracts exceeding $100,000; and (2) provide alternative payment 
protections for construction contracts between $25,000 and $100,000, 
which are no longer subject to the Miller Act, in accordance with 
Section 4104(b) of the Federal Acquisition Streamlining Act of 1994 
(Public Law 103-355).

Item XVIII--Part 31 Agency Supplements (FAR Case 94-606)

    This final rule amends FAR 31.101 to remove the requirement for 
Civilian Agency Acquisition Council approval of agency supplements to 
FAR Part 31. Approval requirements for class deviations from Part 31 
remain unchanged.

Item XIX--Records Retention (FAR Case 93-020)

    This final rule amends the cost principle at 31.201-2 to explicitly 
state that contractors must maintain adequate cost records in order to 
be reimbursed for costs claimed.

Item XX--Legislative Lobbying Costs (FAR Case 93-006)

    This final rule amends FAR 31.205-22, and deletes 31.205-50, to 
clarify the cost principle pertaining to legislative lobbying costs.

Item XXI--Travel Costs (FAR Case 93-022)

    This final rule amends the cost principle at FAR 31.205- 46 to 
specify the documentation required to support travel costs incurred by 
contractors under Government contracts. These documentation 
requirements are consistent with similar requirements already imposed 
by Section 274 of the Internal Revenue Code for travel costs claimed 
for Federal tax purposes.

Item XXII--Prompt Payment Overseas (FAR Case 92-046)

    The interim rule published as Item XIII of FAC 90-20, and further 
amended by Item III of FAC 90-29, is converted to a final rule without 
change. The rule amended FAR 32.901 and the clauses at 52.232-25, 
52.232-26, and 52.232-27 to reflect the applicability of the Prompt 
Payment Act to contracts awarded and performed outside the United 
States.

Item XXIII--Alternate Dispute Resolution/Federal Courts Administration 
Act (FAR Cases 91-062 and 92-301)

    The interim rules are converted to final rules without change. The 
rules were published as Item XIV of FAC 90-20 and Item III of FAC 90-
10. The rules amend the claim certification procedures and the 
Alternative Means of Dispute Resolution (ADR) procedures in FAR Part 
33, and implement section 907(a) of the Federal Courts Administration 
Act of 1992 (Public Law 102-572).

Item XXIV--Defense Production Act Amendments (FAR Case 93-304)

    The interim rule published as Item XXIV of FAC 90-23 is converted 
to a final rule without change. The rule added FAR Subpart 34.1 and a 
clause at 52.234-1 to provide policy and procedures for the testing, 
qualification, and use of industrial resources manufactured or 
developed with assistance provided under Title III of the Defense 
Production Act of 1950.

Item XXV--Child Care Services (FAR Case 91-106)

    The interim rule published as Item XXVII of FAC 90-23 is converted 
to a final rule without change. The rule amended FAR Subpart 37.1 to 
require contracting officers to ensure that contracts for child care 
services include requirements for criminal history background checks of 
employees in accordance with 42 U.S.C. 13041.

Item XXVI--Quick-Closeout Procedures (FAR Case 95-009)

    This final rule amends FAR 42.708 and the clauses at 52.216-7 and 
52.216-13 to permit maximum use of quick contract closeout procedures. 
The rule (1) permits use of quick closeout procedures if total 
unsettled indirect costs allocable to any one contract do not exceed 
$1,000,000; (2) and permits contracting officers to waive the 15 
percent restriction on unsettled indirect costs, based upon a risk 
assessment that considers certain factors.

Item XXVII--Quality Assurance Actions--Electronic Screening (FAR Case 
92-031)

    This final rule amends FAR 46.101 to add definitions of ``latent 
defect'' and ``patent defect.''

Item XXVIII--Quality Assurance Nonconformances (FAR Case 92-027)

    This final rule amends FAR Subpart 46.1 to provide standard 
terminology and guidance pertaining to supplies and services that do 
not meet contract requirements.

Item XXIX--Solicitation Provisions--Contract Clauses (FAR Case 95-603)

    This final rule amends the provision at FAR 52.211-1 to delete the 
statement that copies of specifications may be obtained from General 
Services Administration Business Service Centers. Specifications are no 
longer available from these centers.

Item XXX--Contract Award--Sealed Bidding--Construction (FAR Case 91-
031)

    This final rule amends the provision at FAR 52.214-19 to advise 
offerors that, for construction solicitations, the Government may 
reject bids as nonresponsive if the prices are materially unbalanced. 
This amendment is consistent with the existing language in the 
provisions at 52.214-10 and 52.215- 16, which are used in solicitations 
for other than construction.

Item XXXI--Small Business Innovation Research Rights in Data (FAR Case 
93-305)

    The interim rule published as Item XIX of FAC 90-20 is converted to 
a final rule without change. The rule amended the clause at FAR 52.227-
20 to increase a small business concern's data rights retention period 
from two to four years, in accordance with the Small Business 
Innovation Research Program Policy Directive published by the Small 
Business Administration.

[[Page 31615]]

Item XXXII--Inspection Clauses--Fixed Price (FAR Case 92-001)

    This final rule amends the clauses at FAR 52.246-2, 52.246-4, 
52.246-7, 52.246-12, and 52.246-13 to replace the phrase ``without 
additional charge'' with the phrase ``at no increase in contract 
price'' for clarity.

Item XXXIII--Termination for Convenience (FAR Case 91-102)

    This final rule amends the clause at 52.249-2 to clarify language 
pertaining to settlement of contract termination costs and rights of 
appeal under the Disputes clause.

Corrections and Technical Amendments (Loose-leaf edition only)

Revisions to FAR Utility Matrix (FAR Case 92-617)

    Section 52.301, Solicitation provisions and contract clauses 
(Matrix), is amended in the Utility Services column. The matrix is not 
carried in the Code of Federal Regulations and, therefore, not 
published in the Federal Register. Subscribers to the loose-leaf 
edition will receive matrix changes in FAC 90-39.

Table of Standard Forms and OMB Expiration Dates

    Under the provisions of the Paperwork Reduction Act of 1995 (44 
U.S.C. Chapter 35), the Federal Acquisition Regulation (FAR) 
Secretariat has obtained Office of Management and Budget (OMB) 
clearance of all information collection requirements contained in the 
FAR. In lieu of reissuing Standard and Optional Forms to reflect 
extended OMB approval dates, and to reduce costs of reprinting forms, 
FAR users should make appropriate pen-and-ink changes on any listed 
forms containing expiration dates that differ from the entries 
published below:

            Table of Standard Forms and OMB Expiration Dates            
------------------------------------------------------------------------
                                                      OMB               
   Standard form               Edition              control   Expiration
                                                      No.        date   
------------------------------------------------------------------------
SF 24..............  Rev. 1/90..................   9000-0045     9/30/98
SF 25..............  Rev. 1/90..................   9000-0045     9/30/98
SF 25A.............  Rev. 1/90..................   9000-0045     9/30/98
SF 25B.............  Rev. 10/83.................   9000-0045     9/30/98
SF 28..............  Rev. 1/90..................   9000-0001     9/30/98
SF 34..............  Rev. 1/90..................   9000-0045     9/30/98
SF 35..............  Rev. 1/90..................   9000-0045     9/30/98
SF 119.............  Rev. 1/90..................   9000-0003     9/30/98
SF 129.............  Rev. 6/90..................   9000-0002    10/31/97
SF 254.............  Rev. 11/92.................   9000-0004     3/31/99
SF 255.............  Rev. 11/92.................   9000-0005     4/30/99
SF 273.............  Rev. 8/90..................   9000-0045     9/30/98
SF 274.............  Rev. 8/90..................   9000-0045     9/30/98
SF 275.............  Rev. 8/90..................   9000-0045     9/30/98
SF 294.............  Rev. 10/95.................   9000-0006     3/31/98
SF 295.............  Rev. 10/95.................   9000-0007     3/31/98
SF 1403............  Rev. 9/88..................   9000-0011    10/31/97
SF 1404............  Rev. 9/88..................   9000-0011    10/31/97
SF 1405............  Rev. 9/88..................   9000-0011    10/31/97
SF 1406............  Rev. 9/88..................   9000-0011    10/31/97
SF 1407............  Rev. 9/88..................   9000-0011    10/31/97
SF 1408............  Rev. 9/88..................   9000-0011    10/31/97
SF 1411............  Rev. 10/95.................   9000-0013     9/30/98
SF 1413............  Rev. 6/89..................   9000-0014     4/30/98
SF 1416............  Rev. 1/90..................   9000-0045     9/30/98
SF 1417............  Rev. 8/90..................   9000-0037     9/30/98
SF 1423............  Rev. 12/88.................   9000-0015     5/31/98
SF 1424............  Rev. 7/89..................   9000-0015     5/31/98
SF 1426............  Rev. 7/89..................   9000-0015     5/31/98
SF 1427............  Rev. 7/89..................   9000-0015     5/31/98
SF 1428............  Rev. 7/89..................   9000-0015     5/31/98
SF 1429............  Rev. 7/89..................   9000-0015     5/31/98
SF 1430............  Rev. 7/89..................   9000-0015     5/31/98
SF 1431............  Rev. 7/89..................   9000-0015     5/31/98
SF 1432............  Rev. 7/89..................   9000-0015     5/31/98
SF 1433............  Rev. 7/89..................   9000-0015     5/31/98
SF 1434............  Rev. 7/89..................   9000-0015     5/31/98
SF 1435............  Rev. 7/89..................   9000-0012     5/31/98
SF 1436............  Rev. 7/89..................   9000-0012     5/31/98
SF 1437............  Rev. 7/89..................   9000-0012     5/31/98
SF 1438............  Rev. 7/89..................   9000-0012     5/31/98
SF 1439............  Rev. 7/89..................   9000-0012     5/31/98
SF 1440............  Rev. 7/89..................   9000-0012     5/31/98
SF 1443............  Rev. 10/82.................   9000-0010     8/31/96
SF 1444............  Rev. 10/87.................   9000-0089     4/30/99
SF 1445............  Rev. 10/87.................   9000-0089     4/30/99
SF 1446............  Rev. 10/87.................   9000-0089     4/30/99
SF 1448............  10/95 edition..............   9000-0013     9/30/98
SF 1449............  10/95 edition..............   9000-0136     9/30/98
------------------------------------------------------------------------

[[Page 31616]]

    Dated: June 4, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

Federal Acquisition Circular Number 90-39

    Federal Acquisition Circular (FAC) 90-39 is issued under the 
authority of the Secretary of Defense, the Administrator of General 
Services, and the Administrator for the National Aeronautics and Space 
Administration.
    Unless otherwise specified, all Federal Acquisition Regulation 
(FAR) and other directive material contained in FAC 90-39 is effective 
August 19, 1996, except for Item XV which was effective September 30, 
1995, and Items I, IV, VI, VIII, X, XII through XIV, XVII, XXII through 
XXV, and XXXI, which are effective June 20, 1996.

    Dated: May 16, 1996.
Eleanor R. Spector,
Director, Defense Procurement.
    Dated: May 16, 1996.
Ida M. Ustad,
Deputy Associate Administrator for Acquisition Policy, General Services 
Administration.
    Dated: May 6, 1996.
L.W. Bailets,
Acting Associate Administrator for Procurement National Aeronautics and 
Space Administration.
[FR Doc. 96-14515 Filed 6-19-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF