Federal Register final rules — 1996-07-15

issue-1996-07-15Federal Register final rules — 1996-07-15Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-17994 Karnal Bunt; Public Forum
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36811-36812]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17994]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Animal and Plant Health Inspection Service

7 CFR Part 301

[Docket 96-016-9]

Karnal Bunt; Public Forum

AGENCY: Animal and Plant Health Inspection Service, USDA.

ACTION: Notice of public forum.

-----------------------------------------------------------------------

SUMMARY: We are advising the public that the Animal and Plant Health 
Inspection Service is hosting a public forum in Washington, DC, on the 
Agency's program to control and eradicate Karnal bunt. The forum will 
provide an additional opportunity for the public to comment on the 
regulations established and amended by a series of interim rules 
published in the Federal Register since March, 1996. The regulations 
quarantine portions of Arizona, California, New Mexico, and Texas 
because of infestations of Karnal bunt, restrict the movement of 
regulated articles from the quarantined areas, and provide compensation 
for certain individuals in order to mitigate losses and expenses 
incurred because of Karnal bunt. Comments will also be accepted 
addressing any aspect of the Karnal bunt program not included in the 
regulations, including control and survey activities conducted in the 
quarantined areas, the national Karnal bunt survey program, and the 
certification of wheat for export. Information gathered at the public 
forum will be considered by the Department in developing guidelines and 
procedures for conducting the Karnal bunt program for the 1996-97 wheat 
growing season. USDA intends to schedule additional public forums on 
the Karnal bunt program, to be held in Arizona, California, and Kansas 
over the next 2 months. We will give notice of these additional forums 
in the Federal Register.

DATES: The public forum will be held in Washington, DC, on Wednesday, 
July 17, 1996, from 9 a.m. until 5 p.m.
    Consideration will be given only to comments received on or before 
September 3, 1996.

ADDRESSES: The public forum will be held in room 107A, Jamie L. Whitten 
Federal Building, United States Department of Agriculture, 14th Street 
and Independence Avenue SW., Washington, DC. Persons attending the 
forum should use the entrance to the building facing the Mall, and will 
be required to show picture identification at the Guard Desk. Any 
persons who are unable to attend the forum, but who wish to comment on 
any aspect of the Karnal bunt program, may send written comments.
    Please send an original and three copies of written comments to 
Docket No. 96-016-9, Regulatory Analysis and Development, PPD, APHIS, 
Suite 3C03, 4700 River Road, Unit 118, Riverdale, MD 20737-1238. Please 
state that your comments refer to Docket No. 96-106-9. Comments 
received, including a transcript from the public forum, may be 
inspected at USDA, room 1141, South Building, 14th Street and 
Independence Avenue SW., Washington, DC, between 8 a.m. and 4:30 p.m., 
Monday through Friday, except holidays. Persons wishing to inspect 
comments are requested to call ahead on (202) 690-2817 to facilitate 
entry into the comment reading room.

FOR FURTHER INFORMATION CONTACT: Mr. Stephen Poe, Operations Officer, 
Domestic and Emergency Operations, PPQ, APHIS, 4700 River Road Unit 
134, Riverdale, MD 20737-1236, (301) 734-8247.

SUPPLEMENTARY INFORMATION: This public forum is being held concerning 
the Animal and Plant Health Inspection Service's (APHIS) program to 
control and eradicate Karnal bunt. Comments will be accepted on the 
regulations established and amended by a series of interim rules 
published by APHIS in the Federal Register since March, 1996. These 
interim rules were published on March 28, 1996 (61 FR 13649-13655, 
Docket No. 96-016-3), April 25, 1996 (61 FR 18233-18235, Docket No. 96-
016-5), and July 5, 1996 (61 FR 35107-35109, Docket No. 96-016-6 and 61 
FR 35102-35107, Docket No. 96-016-7). The public forum in Washington, 
DC, will be held on Wednesday, July 17, 1996, in room 107A, Jamie L. 
Whitten Federal Building, United States Department of Agriculture, 14th 
Street

[[Page 36812]]

and Independence Avenue SW., Washington, DC.
    Comments were required to be received on Docket No. 96-016-3 on or 
before May 28, 1996, and on Docket No. 96-016-5 on or before June 24, 
1996. We are reopening and extending the comment periods for both of 
these interim rules until September 3, 1996, in order to receive 
additional public comments at this forum, and at forums in Arizona, 
California, and Kansas to be scheduled over the next 2 months. We will 
give notice of these additional forums in the Federal Register. The 
comment periods for Docket No. 96-016-6 and Docket No. 96-016-7 are 
already scheduled to close on September 3, 1996.
    A representative of the United States Department of Agriculture 
(USDA) will preside at the public forum. Any interested person may 
appear and be heard in person, or through an attorney or other 
representative. Persons who wish to speak at the public forum will be 
asked to provide their names and affiliations. Parties wishing to make 
oral presentations may register in advance by calling the Legislative 
and Public Affairs staff of APHIS, USDA, at (202) 720-2511 before close 
of business on July 15, 1996. Registration will also be held at the 
hearing site on July 17, 1996, from 8 a.m. until 8:45 a.m. Speakers 
will be scheduled in the order their registration is received.
    The public forum will begin at 9 a.m. and is scheduled to end at 5 
p.m. local time. However, the forum may be terminated at any time after 
it begins if all persons desiring to speak have been heard. The 
presiding officer may limit the time for each presentation so that all 
interested persons have an opportunity to participate. Attendees who 
wish to speak but who did not register will be provided time to speak 
only after all registered speakers have been heard.
    The purpose of the forum is to give interested persons an 
opportunity for oral presentation of data, views, and information to 
the Department concerning APHIS' program to control and eradicate 
Karnal bunt. Questions about the content of the interim rules 
concerning Karnal bunt may be part of the commenters' oral 
presentations. However, neither the presiding officer nor any other 
representative of the Department will respond to the comments on the 
interim rules at the forum, except to clarify or explain provisions of 
the interim rules.
    We ask that anyone who reads a statement provide two copies to the 
presiding officer at the forum. A transcript will be made of the public 
forum and the transcript will be placed in the rulemaking record and 
will be available for public inspection.

    Done in Washington, DC, this 10th day of July 1996.
Terry L. Medley,
Administrator, Animal and Plant Health Inspection Service.
[FR Doc. 96-17994 Filed 7-11-96; 10:25 am]
BILLING CODE 3410-34-P

Complete official Federal Register PDF

FR Doc. 96-17919 Karnal Bunt; Removal of Quarantined Areas; Technical Amendment
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36812-36813]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17919]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
7 CFR Part 301

[Docket No. 96-016-8]

Karnal Bunt; Removal of Quarantined Areas; Technical Amendment

AGENCY: Animal and Plant Health Inspection Service, USDA.

ACTION: Interim rule; technical amendment.

-----------------------------------------------------------------------

SUMMARY: In an interim rule effective June 27, 1996, and published in 
the Federal Register on July 5, 1996, we amended the Karnal bunt 
regulations by removing certain areas in Arizona, New Mexico, and Texas 
from the list of areas quarantined because of infestations of Karnal 
bunt. We removed a portion of Mohave County, AZ, from the list of 
quarantined areas that should not have been removed. Therefore, we are 
amending the boundaries of the quarantined area in Mohave County, AZ, 
to add that portion of the county to the list of quarantined areas.

DATES: This amendment is effective July 9, 1996. We will consider 
written comments on the interim rule (Docket No. 96-016-6) published at 
61 FR 35107, as corrected by this document, received on or before 
September 3, 1996.

ADDRESSES: Please send an original and three copies of your comments to 
Docket No. 96-016-6, Regulatory Analysis and Development, PPD, APHIS, 
suite 3C03, 4700 River Road Unit 118, Riverdale MD 20737-1238. Please 
state that your comments refer to Docket No. 96-016-6. Comments 
received may be inspected at USDA, room 1141, South Building, 14th 
Street and Independence Avenue SW., Washington, DC, between 8 a.m. and 
4:30 p.m., Monday through Friday, except holidays. Persons wishing to 
inspect comments are requested to call ahead on (202) 690-2817 to 
facilitate entry into the comment reading room.

FOR FURTHER INFORMATION CONTACT: Mr. Michael B. Stefan, Operations 
Officer, Domestic and Emergency Operations, PPQ, APHIS, 4700 River 
Road, Unit 134, Riverdale, MD 20737-1236, (301) 734-8247; or e-mail: 
[email protected].

SUPPLEMENTARY INFORMATION: In an interim rule effective June 27, 1996, 
and published in the Federal Register on July 5, 1996 (Docket No. 96-
016-6) (61 FR 35107), we amended the Karnal bunt regulations in 7 CFR 
301.89-3(e) by removing areas in Arizona, New Mexico, and Texas from 
the list of areas quarantined because of infestations of Karnal bunt. 
We removed a portion of Mohave County, AZ, from the list of quarantined 
areas that should not have been removed. Therefore, we are amending the 
boundaries of the quarantined area in Mohave County, AZ, to add that 
portion of the county to the list of quarantined areas.
    Before the effective date of this document, the portion of Mohave 
County, AZ, that remained under quarantine for Karnal bunt was located 
in the western central region of the county and, therefore, was 
isolated from the larger, continuous area quarantined for infestations 
of Karnal bunt that includes counties, and portions of counties, in 
Arizona, California, New Mexico, and Texas. We are expanding the 
quarantined area in Mohave County, AZ, to include the portion of the 
county that connects the previously isolated quarantined area to the 
larger quarantined area. The portion of Mohave County, AZ, that we are 
adding to the list of quarantined areas does not produce wheat and has 
no association with Karnal bunt contaminated seed, but regulated 
articles from areas that are quarantined because of infestations of 
Karnal bunt are transported through this area. As amended by this 
document, the quarantined area of Mohave County, AZ, is that portion of 
the county bounded as follows: Beginning at the intersection of 
Arizona/Nevada State line and State Route 68; then east along State 
Route 68 to U.S. Highway 93; then southeast along U.S. Highway 93 to 
Interstate 40; then east along Interstate 40 to U.S. Highway 93; then 
south along U.S. Highway 93 to the Mohave/Yavapai County line; then 
south along the Mohave County line to the Mohave/La Paz County line; 
then west along the Mohave County line to the Arizona/California State 
line; then north along the State line to the point of beginning.
    This action prevents the artificial spread of Karnal bunt into 
noninfested areas of the United States while allowing the movement of 
regulated articles within the area quarantined for Karnal bunt, 
including counties, and portions of counties, in Arizona, California, 
New Mexico, and Texas.

List of Subjects in 7 CFR Part 301

    Agricultural commodities, Plant diseases and pests, Quarantine,

[[Page 36813]]

Reporting and recordkeeping requirements, Transportation.

    Accordingly, 7 CFR part 301 is amended as follows:

PART 301--DOMESTIC QUARANTINE NOTICES

    1. The authority citation for part 301 continues to read as 
follows:

    Authority: 7 U.S.C. 150bb, 150dd, 150ee, 150ff, 161, 162, and 
164-167; 7 CFR 2.22, 2.80, and 371.2(c).

    2. In Sec. 301.89-3, paragraph (e) is amended by revising the entry 
for Mohave, County, AZ, to read as follows:

Sec. 301.89-3   Quarantined areas.

* * * * *
    (e) * * *

Arizona

* * * * *
    Mohave County. Beginning at the intersection of Arizona/Nevada 
State line and State Route 68; then east along State Route 68 to U.S. 
Highway 93; then southeast along U.S. Highway 93 to Interstate 40; then 
east along Interstate 40 to U.S. Highway 93; then south along U.S. 
Highway 93 to the Mohave/Yavapai County line; then south along the 
Mohave County line to the Mohave/La Paz County line; then west along 
the Mohave County line to the Arizona/California State line; then north 
along the State line to the point of beginning.
* * * * *
    Done in Washington, DC, this 9th day of July 1996.
Terry L. Medley,
Administrator, Animal and Plant Health Inspection Service.
[FR Doc. 96-17919 Filed 7-12-96; 8:45 am]
BILLING CODE 3410-34-P

Complete official Federal Register PDF

FR Doc. 96-17917 Goats Imported From Mexico for Immediate Slaughter; Horse Quarantine Facilities
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36816-36817]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17917]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Animal and Plant Health Inspection Service

9 CFR Part 92

[Docket No. 91-101-2]

Goats Imported From Mexico for Immediate Slaughter; Horse 
Quarantine Facilities

AGENCY: Animal and Plant Health Inspection Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are amending the animal importation regulations to clarify 
the quarantine requirements for horses imported into the United States. 
We are not taking final action in this document to remove the 
requirements for a health certificate for goats imported into the 
United States from Mexico for immediate slaughter.

EFFECTIVE DATE: August 14, 1996.

FOR FURTHER INFORMATION CONTACT: Dr. David Vogt, Senior Staff 
Veterinarian, Import/Export Animals, National Center for Import and 
Export, VS, APHIS, 4700 River Road Unit 39, Riverdale, MD 20737-1228, 
(301) 734-8170, or e-mail: [email protected].

SUPPLEMENTARY INFORMATION:

Background

    The regulations in 9 CFR part 92 govern the importation into the 
United

[[Page 36817]]

States of certain animals and poultry and certain animal and poultry 
products. Section 92.308 establishes requirements for the quarantine of 
certain horses imported into the United States. Section 
92.308(c)(2)(ii)(B), which contains the physical requirements for a 
quarantine facility, provides that ``Doors, windows, and other openings 
of the facility shall be provided with double screens which will 
prevent insects from entering the facility.'' However, the preceding 
paragraph, Sec. 92.308(c)(2)(ii)(A) states that ``All walls, floors and 
ceilings shall be constructed of solid impervious material or be 
screened as provided in paragraph (c)(2)(ii)(B) of this section.'' The 
last phrase of this sentence has led some readers to believe that 
walls, floors, and ceilings, of quarantine facilities could somehow be 
constructed of screening. However, our intention is that if a 
facility's solid and impervious walls, floor or ceiling have openings, 
they must be screened in accordance with Sec. 92.308(c)(2)(ii)(B).
    On March 1, 1994, we published in the Federal Register (59 FR 9679-
9681, Docket No. 91-101-1) a proposal to amend the regulations by 
removing the last phrase of the misleading sentence in 
Sec. 92.308(c)(2)(ii)(A) to make it read ``All walls, floors and 
ceilings shall be constructed of solid impervious material.''
    We also proposed, in the same Federal Register document, to amend 
the regulations in Secs. 92.428 and 92.429, concerning importation of 
goats by allowing goats from Mexico to be imported into the United 
States without a health certificate if the goats were imported for 
immediate slaughter.
    We solicited comments concerning our proposal for 60 days ending 
May 2, 1994. We received one comment addressing this proposed change to 
Sec. 92.308(c)(2)(ii)(A), and the comment was supportive.
    Therefore, based on the rationale set forth in the proposed rule, 
we are adopting the portion of the proposal that pertained to horse 
quarantine facilities as a final rule without change.
    We received three comments on this proposed change to Secs. 92.428 
and 92.429 by the close of the comment period. They were from a 
research organization, a State agricultural department, and a goat 
industry representative. One was supportive; the other two expressed 
concern that the goats could present a disease risk.
    The proposed provisions concerning goats are not adopted by this 
document. At this time, we are considering major revisions to the 
regulations for importing ruminants, including goats, and to the 
regulations for importing swine and products of ruminants and swine. 
Interested persons should see Docket No. 94-106-1 (61 FR 16978-17105), 
a proposed rule published for comment on April 18, 1996. The three 
comments received on the proposed change to Secs. 92.428 and 92.429 
will be considered in conjunction with that rulemaking.

Executive Order 12866 and Regulatory Flexibility Act

    This rule has been reviewed under Executive Order 12866. The rule 
has been determined to be not significant for the purposes of Executive 
Order 12866 and, therefore, has not been reviewed by the Office of 
Management and Budget.
    This rule is making a minor change for clarity in our regulations 
concerning horses subject to quarantine after importation into the 
United States. Since this rule change is only a clarification, there 
will be no economic impact on any large or small entities.
    Under these circumstances, the Administrator of the Animal and 
Plant Health Inspection Service has determined that this action will 
not have a significant economic impact on a substantial number of small 
entities.

Executive Order 12778

    This rule has been reviewed under Executive Order 12778, Civil 
Justice Reform. This rule: (1) Preempts all State and local laws and 
regulations that are in conflict with this rule; (2) has no retroactive 
effect; and (3) does not require administrative proceedings before 
parties may file suit in court challenging this rule.

Paperwork Reduction Act

    This rule contains no new information collection or recordkeeping 
requirements under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 
et seq.).
    Accordingly, 9 CFR part 92 is amended as follows:

PART 92--IMPORTATION OF CERTAIN ANIMALS AND POULTRY AND CERTAIN 
ANIMAL AND POULTRY PRODUCTS; INSPECTION AND OTHER REQUIREMENTS FOR 
CERTAIN MEANS OF CONVEYANCE AND SHIPPING CONTAINERS THEREON

    1. The authority citation for part 92 continues to read as follows:

    Authority: 7 U.S.C. 1622; 19 U.S.C. 1306; 21 U.S.C. 102-105, 
111, 114a, 134a, 134b, 134c, 134d, 134f, 135, 136, and 136a; 31 
U.S.C. 9701; 7 CFR 2.22, 2.80, and 371.2(d).

Sec. 92.308  [Amended]

    2. In Sec. 92.308, paragraph (c)(2)(ii)(A) is amended by removing 
the phrase ``or be screened as provided in paragraph (c)(2)(ii)(B) of 
this section''.

    Done in Washington, DC, this 9th day of July 1996.
Terry L. Medley,
Administrator, Animal and Plant Health Inspection Service.
[FR Doc. 96-17917 Filed 7-12-96; 8:45 am]
BILLING CODE 3410-34-P

Complete official Federal Register PDF

FR Doc. 96-17886 Energy Conservation Program for Consumer Products: Procedures for Consideration of New or Revised Energy Conservation Standards for Consumer Products
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36974-36987]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17886]

[[Page 36973]]

_______________________________________________________________________

Part III

Department of Energy

_______________________________________________________________________

Office of Energy Efficiency and Renewable Energy

_______________________________________________________________________

10 CFR Part 430

Procedures for Consideration of New or Revised Energy Conservation 
Standards for Consumer Products; Final Rule

Federal Register / Vol. 61, No. 136 / Monday, July 15, 1996 / Rules 
and Regulations

[[Page 36974]]

DEPARTMENT OF ENERGY

Office of Energy Efficiency and Renewable Energy

10 CFR Part 430

RIN [1904-AA83]

Energy Conservation Program for Consumer Products: Procedures for 
Consideration of New or Revised Energy Conservation Standards for 
Consumer Products

AGENCY: Office of Energy Efficiency and Renewable Energy, Department of 
Energy (DOE).

ACTION: Notice of final rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Department of Energy (DOE or Department) today promulgates 
a rule to elaborate on the procedures, interpretations and policies 
that will guide the Department in establishing new or revised energy 
efficiency standards for consumer products. The process described in 
this rule provides for greatly enhanced opportunities for public input, 
improved analytical approaches, and encouragement of consensus-based 
standards. This enhanced approach was developed by the Department on 
the basis of extensive consultations with many stakeholders.

EFFECTIVE DATE: The procedures, interpretations and policies 
established in this rule take effect on August 14, 1996.

ADDRESSES: A copy of the report entitled ``Results of the Appliance 
Rulemaking Process Improvement Effort,'' from which much of the 
enhanced process described in this rule is derived, may be obtained 
from: U.S. Department of Energy, Office of Energy Efficiency and 
Renewable Energy, Forrestal Building, EE-43, 1000 Independence Avenue, 
SW, Washington, DC 20585, (202) 586-7574. This report may be read at 
the DOE Freedom of Information Reading Room, U.S. DOE, Forrestal 
Building, Room 1E-190, 1000 Independence Avenue, SW, Washington, DC 
20585, (202) 586-6020, between the hours of 9 a.m. and 4 p.m., Monday 
through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT:
Michael J. McCabe, Office of Energy Efficiency and Renewable Energy, 
U.S. Department of Energy, Mail Station EE-43, 1000 Independence 
Avenue, SW, Washington, DC 20585-0121, (202) 586-0371
Douglas W. Smith, Office of General Counsel, U.S. Department of Energy, 
Mail Station GC-70, 1000 Independence Avenue, SW, Washington, DC 20585-
0103, (202) 586-3410
Deborah E. Miller, Office of Energy Efficiency and Renewable Energy, 
U.S. Department of Energy, Mail Station EE-1, 1000 Independence Avenue, 
SW, Washington, DC 20585-0121, (202) 586-8888.

SUPPLEMENTARY INFORMATION:

I. Background on Appliance Standards Program
II. Process Leading to Development of this Rule
III. Description of Rule
    1. Objectives
    2. Scope
    3. Setting Priorities for Rulemaking Activity
    4. Process for Developing Efficiency Standards and Factors to be 
Considered
    5. Policies on Selection of Standards
    6. Effective Date of a Standard
    7. Test Procedures
    8. Joint Stakeholder Recommendations
    9. Principles for the Conduct of Engineering Analysis
    10. Principles for the Analysis of Impacts on Manufacturers
    11. Principles for the Analysis of Impacts on Consumers
    12. Consideration of Non-Regulatory Approaches
    13. Crosscutting Analytical Assumptions
    14. Deviations, Revisions, and Judicial Review
IV. Related DOE Actions to Implement Process Improvements
    1. Finalized process improvement report
    2. Process to develop rulemaking priorities
    3. Review of manufacturer impact analysis
    4. Review of non-regulatory approaches
    5. Creation of an advisory committee
V. Status of Ongoing Rulemakings
VI. Administrative Procedure
VII. Administrative Reviews

I. Background on Appliance Standards Program

    The Department of Energy's appliance standards program is conducted 
pursuant to Title III, Part B of the Energy Policy and Conservation Act 
(EPCA). 42 U.S.C. 6291-6309. In 1987, EPCA was amended to establish by 
law national efficiency standards for certain appliances and a schedule 
for DOE to conduct rulemakings to periodically review and update these 
standards. National Appliance Energy Conservation Act, Pub. L. 100-12 
(1987). The products covered by these standards included refrigerators 
and freezers, room air conditioners, central air conditioners and heat 
pumps, water heaters, furnaces, dishwashers, clothes washers and 
dryers, direct heating equipment, ranges and ovens, pool heaters, and 
fluorescent lamp ballasts. In conducting the rulemakings to update the 
standards, the Secretary of Energy is to set standards at levels that 
achieve the maximum improvement in energy efficiency that is 
technologically feasible and economically justified.
    The Energy Policy Act of 1992 (EPACT) further amended EPCA to 
expand the coverage of the standards program to include certain 
commercial and industrial equipment, including commercial heating and 
air-conditioning equipment, water heaters, certain incandescent and 
fluorescent lamps, distribution transformers, and electric motors. 
Energy Policy Act of 1992, Pub. L. 102-486 (1992). EPACT also 
established maximum water flow-rate requirements for certain plumbing 
products and provided for voluntary testing and consumer information 
programs for office equipment, luminaires, and windows.
    EPCA also provides for DOE to establish test procedures to be used 
in evaluating compliance with efficiency standards. These test 
procedures are revised periodically to reflect new product designs or 
technologies.
    As prescribed by EPCA, energy efficiency standards are established 
by a three-phase public process: Advance Notice of Proposed Rulemaking 
(ANOPR); Notice of Proposed Rulemaking (NOPR); and Final Rule. The 
process to develop test procedures is similar, except that an Advance 
Notice is not required.
    In updating standards as required by EPCA, DOE revised standards 
for refrigerators and freezers in November 1989, with those standards 
becoming effective in January 1993. 54 FR 47916 (Nov. 17, 1989). These 
standards resulted in an approximately 25 percent reduction in 
refrigerator energy use. In May 1991, DOE issued revised energy 
conservation standards for clothes washers, clothes dryers, and 
dishwashers which became effective on May 14, 1994. 56 FR 22250 (May 
14, 1991).
    DOE has published notices of proposed rulemaking on revised 
standards for a number of covered products. A NOPR for energy 
conservation standards for eight products (water heaters, room air-
conditioners, mobile-home furnaces, direct-heating equipment, pool 
heaters, kitchen ranges and ovens, fluorescent lamp ballasts, and 
televisions) was published in March 1994. 59 FR 10464 (March 4, 1994). 
DOE has since withdrawn the proposal to establish standards for 
television sets. 60 FR 32627 (June 23, 1995). With regard to ballasts 
and electric water heaters, DOE is gathering further inputs and 
conducting further analysis. 60 FR 5880 (Jan. 31, 1995). In July 1995, 
the Department issued a NOPR for energy conservation standards for 
refrigerator

[[Page 36975]]

products which was based largely on a proposal made by a coalition of 
refrigerator manufacturers, electric utilities, states and energy 
conservation advocates. 60 FR 37388 (July 20, 1995).
    The Department of the Interior and Related Agencies Appropriations 
Act for Fiscal Year 1996 included a moratorium on proposing or issuing 
energy conservation appliance standards for the remainder of Fiscal 
Year 1996. See Pub. L. 104-134. The Department is continuing to work on 
the analyses underlying proposed standards and on test procedure 
revisions during this fiscal year.
    The appliance standards program supports key objectives of the 
Administration's Sustainable Energy Strategy, which include: Increasing 
the efficiency of energy use in order to strengthen our economy and 
improve living standards; reducing the adverse environmental impacts 
associated with energy production, delivery and use; and keeping 
America secure by reducing our vulnerability to global energy market 
shocks. Although the Department recognizes that policies that rely on 
market forces or market-based incentives are preferable in many 
circumstances, appropriate regulatory intervention can achieve 
efficiency gains that will benefit consumers, businesses, and the 
Nation. Existing appliance standards are projected to save 23 
quadrillion BTUs of energy from 1993 to 2015, resulting in estimated 
consumer savings of $1.7 billion per year in 2000 and estimated annual 
emission reductions of 107 million tons of carbon dioxide and 280 
thousand tons on nitrogen oxides by 2000. An aggressive program for 
promoting the efficient use of energy resources, including appliance 
efficiency standards that are technically feasible and economically 
justified, is a critical element of the Sustainable Energy Strategy.

II. Process Leading to Development of This Rule

    Since the National Performance Review's recommendations on 
Regulatory Reform were issued over two years ago, the U.S. DOE has 
forged new ways of carrying out its appliance standards rulemaking 
responsibilities. To supplement the traditional rulemaking process 
established by law, the Department has encouraged consensus-based 
alternatives and invited interest group participation in the early 
stages of standards development with mechanisms such as technical 
sessions and workshops.
    In September 1995, the Department announced a formal effort to 
consider further improvements to the process used to develop appliance 
efficiency standards, calling on energy efficiency groups, 
manufacturers, trade associations, state agencies, utilities, and other 
interested parties to provide input to guide the Department's work. To 
date, the Department's process improvement effort has consisted of 
several elements:

--A series of preliminary meetings were held with interested parties to 
identify opportunities for improvement in the rulemaking process, 
standards priority setting, analysis methods and Department decision-
making;
--Interviews were conducted with thirty organizations that have 
participated in past appliance rulemakings to solicit information 
regarding the perceived strengths and weaknesses of the process;
--A preliminary draft ``Process Improvement Plan'' was developed from 
these initial meetings and interviews;
--A public workshop was held to obtain broad-based input on the 
Department's draft ``Process Improvement Plan'' and other elements of 
the Department's proposed new approach;
--A draft report entitled ``Results of the Appliance Rulemaking Process 
Improvement Effort'' was prepared and distributed for comment to the 
workshop participants;
--Follow-up meetings were held with interested parties on the issues 
raised in the draft report; and
--Several drafts of today's rule were shared with stakeholders, and the 
Department addressed numerous comments made by interested parties in 
written submissions and during two well-attended stakeholder workshops.

    The publication of this rule is an important step in 
institutionalizing the procedural improvements identified in this 
process. It is not, however, the only step. Other actions in the 
Department's process improvement effort include: A review of the 
manufacturing impact analysis model and methodologies; a review of non-
regulatory approaches; the prioritization of future rules; and the 
creation of an advisory committee consisting of a representative group 
of interested parties, to oversee the implementation of these 
commitments. (See section IV of the Supplementary Information.) The 
objective is to act quickly to implement this enhanced standards 
development process, and to continue to invite extensive stakeholder 
consultation in the implementation phase.
    The Department's many stakeholders have contributed tremendously to 
this effort to review the Department's procedures. The Department 
appreciates that sustained contribution, and is committed to implement 
a process that is more responsive to stakeholder concerns.

III. Description of Rule

1. Objectives

    Section 1 of the rule articulates the Department's major objectives 
for the enhanced process to be employed for considering new or revised 
appliance efficiency standards. The Department's objectives are to:
    (a) Provide for early input from stakeholders
    (b) Increase predictability of the rulemaking timetable
    (c) Increase use of outside technical expertise
    (d) Eliminate problematic design options early in the process
    (e) Fully consider non-regulatory approaches
    (f) Conduct thorough analysis of impacts
    (g) Use transparent and robust analytical methods
    (h) Articulate policies to guide selection of standards
    (i) Support efforts to build consensus on standards
    (j) Reduce time and cost of developing standards

2. Scope

    Section 2 describes the applicability of the enhanced process 
contained in the rule. The Department has adopted a common sense 
approach to the transition to this enhanced process.
    DOE will use the new approach for all new rulemakings. With regard 
to rulemakings that are already underway, DOE and interested parties 
have invested substantial effort and resources. In balancing whether 
the benefits of using this enhanced process justify the delay of 
starting these rulemakings anew, DOE has concluded that the new process 
will be used, from the start, with respect to rulemakings in which a 
NOPR has not yet been published. To the extent analytical work has 
already been done or public comment on an ANOPR has already been 
provided, such analysis and comment will be considered, as appropriate, 
in proceeding under the new process. A case-by-case review is needed to 
determine how to proceed (i.e., whether some or all of the analytical 
or procedural steps should be repeated) with respect to products for 
which a NOPR has been issued and the

[[Page 36976]]

analysis is nearly complete. DOE's intentions concerning how to proceed 
with those rulemakings that are beyond the NOPR stage are discussed in 
some detail in section V below. Note that the rulemakings beyond the 
NOPR stage include one rule based on a consensus stakeholder 
recommendation and others for which there has been shared analysis and 
public workshops consistent with the direction of this rule.

3. Setting Priorities for Rulemaking Activity

    Section 3 describes the process that will be used in developing 
rulemaking priorities, including factors to be considered. The annual 
process invites public input on the program's rulemaking agenda for the 
coming year, establishes factors to be considered in establishing 
priorities, and provides, in conjunction with the Department's 
Regulatory Agenda, a clear set of expectations about the scheduled 
rulemaking activities.

4. Process for Developing Efficiency Standards and Factors To Be 
Considered

    Section 4 establishes the process for developing efficiency 
standards. This process is designed to provide for greater, and more 
productive, interaction between the Department and interested parties 
throughout the process. It is also designed so that key analyses are 
performed earlier in the process, with early opportunities for public 
input to and comment on the analyses. The process is consistent with 
the procedural requirements of law, but adds some important steps to 
enhance the process.
    Building upon the National Performance Review's regulatory reform 
initiative, an effort has been underway at the Department to increase 
consultation with interested parties at every stage of the rulemaking 
process. In addition to holding the formal public hearings and 
soliciting written comments, the Department has increased its use of 
public workshops and other less formal tools to develop more effective 
standards. The Department has received broad support for its recent 
efforts to open the standards development process and its commitment to 
obtain input from interested parties early--well in advance of the 
ANOPR--and often in the rulemaking process.
    Section 4 also articulates factors that DOE will take into account 
in screening design options, selecting candidate standard levels, and 
selecting proposed and final standard levels.
(a) Pre-ANOPR Screening and Analysis of Design Options
    As described in section 4(a), the first step in a rulemaking will 
be a screening analysis that will identify the product categories and 
technologically feasible design options and then narrow the range of 
design options being considered for the development of candidate 
standard levels. This screening analysis, along with the engineering 
analysis and the selection of candidate standard levels, will occur 
before DOE publishes an ANOPR.
    Some manufacturers have expressed concern that the Department may 
devote too much attention to consideration of design options that: Are 
not practical to mass manufacture, install or service; have substantial 
impacts on consumer utility; or raise significant safety concerns. The 
screening step is designed to address these concerns. The Department 
will develop, with input from interested parties, a list of design 
options for further consideration. The Department will eliminate from 
further consideration a design option that: Is not technologically 
feasible; is not practicable to manufacture, install and service; has 
significant adverse impact on the utility of the product to consumers; 
or adversely affects health or safety. Consistent with Natural 
Resources Defense Council v. Herrington, 768 F.2d 1355 (D.C. Cir. 
1985), the Department will evaluate design options for technological 
feasibility on the basis of whether the options are in use by industry 
or research has progressed to the development of a prototype. However, 
consideration of practicability to manufacture, impacts on consumer 
utility and health and safety effects at this stage is designed to 
ensure that commercially impractical designs, even if technologically 
feasible, are screened out on the basis of other statutory criteria 
early in the process. This early screening approach should reduce 
uncertainty as to the direction of standards development.
    The Department will seek expert input to conduct the necessary 
analyses. The Department, with input from interested parties, will 
identify issues that will be examined in the engineering analysis and 
the types of specialized expertise that may be required. With these 
specifications, DOE will select appropriate contractors, 
subcontractors, and as necessary, expert consultants to perform the 
engineering analysis and the impact analysis. DOE, in consultation with 
interested parties, also will identify technology/industry experts who 
can provide independent, expert review of the results of the 
engineering analysis and the subsequent impact analysis. The Department 
will consider in the analyses, wherever feasible, data, information and 
analyses received from stakeholders.
    After the screening of design options, the DOE contractor will 
perform engineering and initial economic analysis of the design 
options. The results of this analysis will be distributed for review by 
experts and interested parties. If appropriate, a public workshop will 
be conducted to review these results.
    The process does not contemplate that the early screening process 
will be the final opportunity to gather and consider input on whether a 
design option is technologically feasible; is practicable to 
manufacture, install and service; has significant adverse impact on 
utility of the product to consumers; or adversely affects health or 
safety. Any new information on these issues that is provided in later 
stages of the rulemaking will be considered, as provided in sections 
4(b)(4) and 4(d)(7)(ix), and a preliminary determination to include or 
exclude consideration of a design option based on the screening 
analysis may be revised if supported by a reexamination of these 
factors based on new information.
    This emphasis on the early stages of the process is designed to 
enable interested parties and DOE to engage in a more productive, 
informative interaction on standards issues prior to the publication of 
the ANOPR, so that the standards development process starts with the 
best possible foundation of common understanding.
(b) Factors in Selection of Proposed Standard
    Section 4(c) provides that following review of comments on the 
ANOPR, DOE's contractor will conduct specified impact analyses to be 
used by DOE in selecting proposed standards. The factors to be 
considered by DOE in selection of proposed standard levels include:
    (i) Consensus stakeholder recommendations
    (ii) Impacts on manufacturers
    (iii) Impacts on consumers
    (iv) Impacts on competition
    (v) Impacts on utilities
    (vi) National energy, economic and employment impacts
    (vii) Impacts on the environment and energy security
    (viii) Impacts of non-regulatory approaches
    (ix) New information relating to factors use for screening design 
options.

[[Page 36977]]

    The Department's approach to analysis and consideration of several 
of these key factors is discussed in sections 10, 11, and 12 of the 
rule.
(c) Enhanced Opportunities for the Public to Receive Information and 
Provide Input
    Throughout the process, the Department will provide interested 
parties with opportunities to provide data, recommendations and other 
comments. DOE will share with the public both analyses and preliminary 
decisions to inform interested parties as to the progress of standards 
development. This information from the Department will enable the 
public to provide informed input to DOE at each step of the process.
    With the goal of better informing stakeholders about DOE rulemaking 
activities, the Department will use various methods, in addition to 
Federal Register notices, to notify interested parties of upcoming 
meeting and rulemaking notices, such as industry publications, Inside 
Energy, Air Conditioning News, Appliance Magazine, Product Safety 
Letter, and the Energy Efficiency and Renewable Energy Network (EREN) 
located on the Internet at http://www.eren.doe.gov.
(d) Timely Completion of Rulemakings
    The Department's intent is to use a process that will produce 
standards that have sound analytical grounding and have been subject to 
thorough review and comment without making the process unduly time-
consuming. The entire process provided for in section 4, from the date 
of issuance of the listing of priorities indicating that work is about 
to begin on the development of a new standard, to issuance of the final 
rule, should take no more than three years. The time required from 
issuance of an ANOPR to issuance of a final rule should be no more than 
18 months.
    Timely completion of rulemakings is essential. If experience 
demonstrates rulemakings are not being completed within a 3-year 
timeframe using this new process, DOE will reconsider this process to 
explore how changes can be made to expedite the process.

5. Policies on Selection of Standards

    Section 5 describes Department policies concerning the selection of 
new or revised standards, and decisions preliminary thereto. These 
policies are intended to provide guidance for making the determinations 
required by section 325 of the EPCA, 42 U.S.C. 6295.
    Section 5(b) states policy guidance for screening design options. 
In particular, it states that a design option will not be considered 
further if it is determined that the technology: is not incorporated in 
a commercial product or a working prototype; will not be capable of 
being mass produced and installed and serviced by persons serving the 
relevant market at the time a standard would take effect; will have 
significant adverse impact on the utility of the product to consumers, 
or result in the unavailability of any product type generally available 
in the U.S. market; or will have significant adverse impacts on health 
or safety.

    Section 5(c) and (d) describe the policies pertaining to the 
selection of candidate standard levels.

    Sections 5(e) and (f) describe Department policies guiding 
selection of proposed and final standard levels. Section 325(o)(2)(A) 
of EPCA provides that any new or revised standard must be designed to 
achieve the maximum improvement in energy efficiency that is determined 
to be technologically feasible and economically justified. A candidate 
standard level will not be proposed or promulgated if the Department 
determines that it is not technologically feasible and economically 
justified. See EPCA section 325(o)(3)(B). A standard level is 
economically justified if the benefits exceed the burdens. See EPCA 
section 325(o)(2)(B)(i).

    The Department encourages efforts to develop consensus among 
interested parties on proposals for new or revised standards as an 
effective mechanism for balancing the economic, energy, and 
environmental interests affected by standards. Thus, notwithstanding 
any other policy on selection of proposed standards, a consensus 
recommendation on an updated efficiency level submitted by a group that 
represents all interested parties will be proposed by the Department if 
it is determined to meet the statutory criteria.

    Section 5(e) articulates a number of policies to guide the 
application of EPCA's economic justification criterion in selecting a 
proposed standard. Although many factors are pertinent to the ultimate 
judgment about whether the benefits of a standard level exceed the 
burdens, these policies reflect special concern about particular types 
of significant adverse impacts on consumers and manufacturers in 
reaching that judgment.

    The policies articulated in section 5(e)(3)(i) are stated as 
rebuttable presumptions. Although these presumptions reflect the great 
significance DOE attaches to these factors, DOE will consider evidence 
that rebuts an applicable presumption that a standard level is not 
economically justified. Any applicable presumption will be rebutted if 
the Department determines that specifically identified expected 
benefits of the standard would outweigh the expected adverse effects.

6. Effective Date of a Standard

    Section 6 provides that the lead time between the publication of a 
final rule in the Federal Register and the effective date of the new or 
revised standard will be at least the period contemplated by the 
rulemaking schedules contained in EPCA. The Department will consider, 
on a case-by-case basis, further extending this lead time if the 
circumstances warrant. For instance, the lead time might be extended to 
mitigate the cumulative burden of implementing multiple product 
regulations or to permit time for market acceptance of new products. 
This section also provides that the period between the effective date 
of one standard and the effective date of any revision to that standard 
will be at least the period contemplated by the rulemaking schedules 
contained in EPCA. These policies will ensure that the time available 
for manufacturers to prepare for implementation of a new or revised 
standard and the time available for the amortization of any fixed costs 
associated with compliance will be no less than anticipated in the 
statute.

7. Test Procedures

    Section 7 states the Department's commitment to ensure that 
revisions to test procedure rules necessary to evaluate revisions to 
standards are developed and finalized in a timely fashion.
    Any necessary modifications in test procedures will be proposed 
before issuance of an ANOPR on revised standards and will be finalized 
prior to the issuance of a NOPR on revised standards. Where significant 
test procedure changes are needed, DOE will attempt to finalize test 
procedure revisions before the issuance of an ANOPR on revised 
standards.

8. Joint Stakeholder Recommendations

    Section 8 states that the Department supports efforts by groups of 
interested parties to develop and present consensus recommendations on 
standards to DOE. Throughout the standards development process, and 
especially following the issuance of the ANOPR, interested parties are 
welcome to develop common recommendations to the Department on product 
categories and standard levels as well as on more specific analytical 
issues. The

[[Page 36978]]

Department will seek to support these efforts in whatever way possible.

9. Principles for the Conduct of Engineering Analysis

    Section 9 states the Department's commitment to solicit input from 
interested parties and experts in conducting the engineering analysis. 
The Department will use this input to develop the design options to be 
considered in the subsequent analyses, identify any engineering models 
necessary, and estimate the likely cost and performance improvement 
potential of design options. The Department will use analytical methods 
that explicitly account for uncertainty.

10. Principles for the Analysis of Impacts on Manufacturers

    Section 10 describes the approach DOE will use in the analysis and 
consideration of impacts on manufacturers. The process addresses a 
number of concerns raised in the process improvement effort. First, the 
process provides opportunities for comments in the pre-ANOPR screening 
process and at the beginning of the impact assessment process. This 
will focus attention on items of specific concern to each individual 
regulatory proceeding. Discussions on what data are critical as well as 
the specific approaches for generating those data will be conducted in 
open proceedings. Second, the Department will utilize an annual cash 
flow approach to determine quantitative impacts on manufacturers 
including a short term assessment based on the cost and capital 
requirements during the period between the announcement of a regulation 
and the time when the regulation comes into effect. Third, with input 
from manufacturers and other interested parties, the Department will 
develop estimates of the critical variables affecting manufacturers 
(such as expected changes in product prices, sales, and possible fuel 
switching) drawing on multiple sources of data both quantitative and 
qualitative. Fourth, the Department will analyze the impacts of a 
standard on different types of manufacturers, with particular attention 
to impacts on small manufacturers. This will be done with scenario 
analysis or other appropriate methods. Fifth, the Department will use 
models that: are clear and understandable; feature accessible 
calculations; and recognize and report the range of uncertainty. 
Finally, the Department will assess and describe the effects on 
manufacturers of other significant product-specific regulations that 
will take effect within three years of the effective date of the 
standard under consideration and will affect significantly the same 
manufacturers. This assessment is intended to capture the impacts of 
different DOE standards affecting multiple products made by the same 
manufacturing division.
    With respect to overlapping efficiency standards on a product and 
components of the product, the Department will pay special attention to 
the cumulative regulatory burden being borne by the manufacturer of 
finished products containing that component. In such cases, the 
Department will specifically address the cost of potential component 
standards plus the overlapping costs of existing parallel standards on 
both the component and the system in which the component is installed.

11. Principles for the Analysis of Impacts on Consumers

    Section 11 describes the Department's approach to consideration of 
consumer impacts. First, in the very early stages of standard 
development, DOE will consider adverse impacts of design options on 
consumer utility and will identify other possible impacts on consumers 
of updated efficiency standards which may warrant closer examination 
during the standards development process. Second, DOE will determine, 
on the basis of any information submitted during the standard 
development process, whether a proposed standard is likely to result in 
the unavailability of any covered product type with performance 
characteristics, features, sizes, capacities, and volumes that are 
substantially the same as products generally available in the U.S. at 
the time. Consistent with EPCA, DOE will not promulgate a standard at a 
level where it concludes that it would result in such unavailability. 
Third, the Department will consider the views of the Department of 
Justice on any impacts of a proposed standard on competition, and will 
not issue a standard determined to have significant anticompetitive 
impacts. Fourth, the Department will use regional analysis and 
sensitivity analysis tools, as appropriate, to evaluate the potential 
distribution of impacts of candidate standards levels on consumers. The 
Department will consider impacts on significant segments of society in 
determining standards levels. Where significant subgroups would be 
expected to bear significant adverse impacts, DOE will place increased 
emphasis on voluntary programs to bring about additional potential 
energy savings.
    The Department will be sensitive to first cost increases and make 
greater use of sensitivity analysis and scenario analysis in reporting 
consumer Life-Cycle Cost, Payback Period and Cost of Conserved Energy. 
The Department expects that the use of these methods will result in 
more economically efficient standards than reliance on pay-back period 
alone, while achieving the similar result of avoiding negative impacts 
to identifiable population groups.
    Substantial increases in product prices may adversely affect low-
income households or cause shifts in product purchasing patterns. Thus, 
if a candidate standard level would cause a substantial increase in the 
product first costs to consumers or would not pay back such additional 
first costs through energy cost savings in less than three years, 
Department will specifically assess the likely impacts of such a 
standard on low-income households, product sales and fuel switching. 
The results of this assessment will be considered in the evaluation of 
consumer and manufacturer impacts.
    As noted during the process improvement effort, consumers have 
rarely participated directly in standards development. In order to 
address concerns about the lack of such direct participation, DOE will 
seek to strengthen its efforts to inform and involve consumers and 
consumer representatives in the process of developing standards. This 
will include expanded notification of consumer representatives during 
the process of developing updated efficiency standards and, where 
appropriate, DOE may seek the direct input of consumers.
    The Department is committed to improving the analysis of 
engineering issues and consumer and manufacturer impacts. The 
Department also is cognizant that using ever more elaborate 
quantitative approaches carries the risk of unacceptable delays and 
incomprehensible analysis and results. For these reasons, the 
Department will seek to balance appropriately the use of quantitative 
and qualitative approaches, with the goal of providing the most useful 
information upon which to make the required judgments.

12. Consideration of Non-Regulatory Approaches

    Section 12 states the Department's commitment to consider fully the 
likely effects of market forces and any non-regulatory initiatives in 
assessing the incremental benefits of efficiency standards. DOE 
considers voluntary ``market pull'' programs to be an

[[Page 36979]]

important complement to its standards program.

13. Crosscutting Analytical Assumptions

    Section 13 describes the principles the Department intends to 
follow in selecting the key assumptions which are critical to the 
quantitative analysis of the impacts of candidate standard levels, 
including rates of economic growth, energy price and demand trends, 
product specific energy efficiency trends, real discount rates and 
emission rates. These cross-cutting analytical assumptions will 
continue to be specifically identified in all notices of proposed 
rulemaking and will continue to be subject to public comment and review 
as part of each such rulemaking.
    Certain crosscutting analytical assumptions will change regularly 
as forecasts of economic growth, energy price, demand, efficiency and 
other trends are modified. In other cases, such as the real discount 
rates used to assess the present value of future costs or savings for 
consumers, commercial businesses, manufacturers or the Nation, the 
Department hopes that the crosscutting analytical assumptions will 
remain relatively stable. For residential consumers, the Department 
currently uses real discount rates of 2, 6 and 15% in the analysis of 
likely impacts of appliance standards. For commercial users, the 
Department currently uses 4, 8 and 12%. For manufacturers, the 
Department currently uses 12%, but is likely to develop a range of 
values for future use. For National benefits, the Department currently 
uses 7%.
    With respect to the consideration of the impacts of candidate 
standards on the environment and energy security, the Department can 
find no sound analytical method for accurately estimating the monetary 
value of such environmental or energy security benefits (or costs). 
Therefore, the Department will not attempt to incorporate the estimated 
monetary value of such externalities into its estimates of the national 
net present values of candidate standard levels. However, as required 
by the National Environmental Policy Act, the Department will continue 
to consider the likely effects of candidate standard levels on the 
environment and energy security in reaching a decision as to whether 
the benefits of the such standard levels exceed their burdens.
    EPCA provides that energy conservation standards prescribed under 
EPCA are to be based on energy consumption at the point of use (i.e., 
site energy). See EPCA sections 321 (4), (5) and (6). For purposes of 
estimating energy savings in evaluating the benefits of a proposed 
standard, DOE considers the energy savings associated with the 
production of the fuel used by the appliance covered by the standard 
(i.e., source energy).

14. Deviations, Revisions and Judicial Review

    The Department has crafted this rule to include procedures, 
interpretations and policies that it believes will be appropriate for 
general use in the future conduct of the appliance standards program. 
However, given the possibility of unanticipated circumstances affecting 
either particular rulemakings or the program generally, the rule 
includes provision for case-specific deviations and modifications of 
the generally applicable rule. If the Department concludes that 
elements of this rule are not appropriate in a particular standards 
rulemaking, DOE will provide interested parties with notice of the 
deviation and an explanation of why such a deviation was deemed 
appropriate. If the Department concludes, based on experience with this 
approach, that changes in this Appendix are appropriate, DOE will 
provide notice of such modifications to the rule with an accompanying 
explanation. DOE will consult with interested parties, probably through 
the advisory committee (described in section IV.5 of this Supplementary 
Information), prior to any such modification to the rule. The 
procedures, interpretations, and policies stated in this Appendix are 
not intended to establish any new cause of action or right to judicial 
review. Judicial review of final rules is provided for in section 336 
of EPCA.

IV. Related DOE Actions To Implement Process Improvements

    In addition to promulgation of this rule, DOE employed other 
activities to address some of the concerns raised by stakeholders 
during the process improvement. These activities are described below.

1. Finalized Process Improvement Report

    The Department will issue the final report on ``Results of the 
Appliance Rulemaking Process Improvement Effort'' in August 1996.

2. Process To Develop Rulemaking Priorities

    On June 14, 1996, the Department held a public workshop on 
priority-setting and DOE will make available a draft priority listing 
based on the results of our priority-setting analysis in late July. The 
draft rulemaking priority listing and the accompanying analysis will: 
Indicate for which covered products DOE is proposing to initiate or 
continue, during the next two years, the development of updated 
standards; document the priority-setting analysis which DOE used to 
develop the draft priority listing; indicate the next steps for all 
currently active rulemakings; describe any variations from the enhanced 
process that will be followed for specific products; and provide a 
schedule for completion of each rulemaking identified.
    The final list of rulemaking priorities will be available at the 
time that the Regulatory Agenda is published in the Federal Register in 
the fall of 1996. During the summer, the Department will obtain public 
comments on the draft listing of rulemaking priorities.

3. Review of Manufacturer Impact Analysis

    In order to initiate the process of developing new and 
substantially improved methods for assessing the impacts of standards 
on manufacturers, DOE will review in detail the existing analyses 
methodologies, develop a draft work plan for the development of new 
methods for assessing manufacturer impact, and invite comments and 
suggestions from interested parties.

4. Review of Non-Regulatory Approaches

    DOE has initiated a process for developing methods for comparing 
the likely benefits and costs of updated efficiency standards to 
various non-regulatory alternatives. For instance, DOE held a public 
workshop on June 20, 1996 which examined, among other issues, 
alternatives and complements to standards for fluorescent lamp 
ballasts. DOE expects to hold one or more similar workshops to examine 
these issues with regard to other products.

5. Creation of an Advisory Committee

    DOE is establishing an Advisory Committee on Appliance Energy 
Efficiency Standards. The Committee will provide an official, organized 
forum for interested parties to provide the Department with advice, 
information, and recommendations on the Appliance Efficiency Standards 
rulemaking process. Committee members will be chosen to ensure an 
appropriately balanced representation of various points of view and 
functions of interested parties and experts, such as manufacturer trade 
associations, manufacturers, energy efficiency groups, consumers, 
utilities, retailers, and state energy offices. The Assistant Secretary

[[Page 36980]]

for Energy Efficiency and Renewable Energy will chair the Committee.
    It is anticipated that this advisory committee will be a useful 
forum for obtaining advice on the desirability of making changes to the 
procedures, interpretations and policies set out in this rule, and on 
cross cutting analytical issues affecting all product standards. The 
Advisory Committee may recommend that DOE undertake generic proceedings 
relating to crosscutting analytical issues.

V. Status of Ongoing Rulemakings

    As stated in section 2 of the rule, the Department will apply the 
new process described in section 4 of the rule to all rulemakings for 
which a NOPR has not yet been published. To the extent analytical work 
has already been done, and public comment on an ANOPR already has been 
provided, such analysis and comment will be considered, as appropriate, 
in proceeding with the new process.
    The Department is precluded through September 1996 from using funds 
appropriated under the Fiscal Year 1996 Interior Appropriations Act to 
propose or promulgate new or revised efficiency standards. With respect 
to rulemakings for which a NOPR has already been published, DOE 
currently intends to proceed as follows:
    Refrigerators. The analysis of comments on the NOPR is complete. At 
this time, DOE believes that no major changes to the underlying 
analysis of the proposed refrigerator standards is necessary. However, 
the Department expects to consult further with interested parties to 
determine whether it is appropriate to make alterations to the proposed 
standards to take into account the interaction between the revised 
efficiency standards and Clean Air Act and Montreal Protocol on 
Substances that Deplete the Ozone Layer regulations relating to 
manufacture of HCFCs, which take effect in 2003, as suggested by some 
stakeholders. The Department expects that any further consideration of 
this issue would be consistent with the approach taken in today's rule 
on pertinent topics such as cumulative regulatory burden.
    Ballasts. The analysis underlying the previously proposed standards 
has been substantially revised and has been circulated for technical 
review by manufacturers and other interested parties. A public workshop 
to review this revised analysis was held on June 20, 1996.
    Cooking Products and Room Air Conditioners. The analyses underlying 
the proposed standards for these two product categories have been 
substantially revised and are now being circulated for technical review 
by manufacturers and other interested parties. On the basis of these 
analyses and any comments received on these analyses, the Department 
expects to proceed to issue a final rule after the current fiscal year 
1996 moratorium expires.
    Water Heaters. The analyses for gas, oil and electric water heaters 
are being revised and will be completed and made available for review 
depending on the priority given this product. A revised NOPR would be 
issued following the new procedure.
    Mobile Home Furnaces, Direct Heating Equipment and Pool Heaters. 
The analyses for these products have been revised and will be made 
available for review depending on the priority given them. Revised 
NOPRs would be issued following the new procedure.
    In the near term, DOE will consider these rulemakings among others 
in the upcoming priority setting effort, and will solicit and consider 
public comment on how to proceed with these rules in that process.

VI. Administrative Procedure

    The rule published today describes procedures, interpretations, and 
policies DOE will follow in conducting rulemakings on appliance 
standards. DOE is not required to provide for prior notice and 
opportunity for comment on today's final regulations because they fall 
within the Administrative Procedure Act's exception for 
``interpretative rules, general statements of policy, or rules of 
agency organization, procedure, or practice.'' 5 U.S.C. 553(b)(A). 
Moreover, these procedures, interpretations and policies were developed 
with extensive consultation with representatives of all of the 
interests that typically participate in standards rulemakings. The 
consultations to date are described in detail in section II of this 
Supplementary Information.

VII. Administrative Reviews

A. Review Under Executive Order 12866

    This regulatory action is not a significant regulatory action under 
Executive Order 12866, ``Regulatory Planning and Review,'' October 4, 
1993. Accordingly, this action was not subject to review under the 
Executive Order by the Office of Information and Regulatory Affairs.

B. Review Under Executive Order 12612

    Executive Order 12612 requires that regulations, rules, 
legislation, and any other policy actions be reviewed for any 
substantial direct effect on states, on the relationship between the 
National Government and states, or in the distribution of power and 
responsibilities among various levels of government. If there are 
substantial effects, then the Executive Order requires preparation of a 
federalism assessment to be used in all decisions involved in 
promulgating and implementing a policy action.
    The final rules published today do not regulate the states. They 
primarily will affect the manner in which DOE develops proposed rules 
to revise consumer product energy efficiency standards. Section 327 of 
the EPCA provides for preemption of state regulation in this area. The 
final rules published today do not alter the distribution of authority 
and responsibility to regulate in this area. Accordingly, DOE has 
determined that preparation of a federalism assessment is unnecessary.

C. Review Under Executive Order 12988

    With respect to the review of existing regulations and the 
promulgation of new regulations, section 3(a) of Executive Order 12988, 
``Civil Justice Reform,'' 61 FR 4729 (February 7, 1996), imposes on 
Executive agencies the general duty to adhere to the following 
requirements: (1) Eliminate drafting errors and ambiguity; (2) write 
regulations to minimize litigation; and (3) provide a clear legal 
standard for affected conduct rather than a general standard and 
promote simplification and burden reduction. With regard to the review 
required by section 3(a), section 3(b) of the Executive Order 
specifically requires that Executive agencies make every reasonable 
effort to ensure that the regulation: (1) Clearly specifies the 
preemptive effect, if any; (2) clearly specifies any effect on existing 
Federal law or regulation; (3) provides a clear legal standard for 
affected conduct while promoting simplification and burden reduction; 
(4) specifies the retroactive effect, if any; (5) adequately defines 
key terms; and (6) addresses other important issues affecting clarity 
and general draftsmanship under any guidelines issued by the Attorney 
General. Section 3(c) of the Executive Order requires Executive 
agencies to review regulations in light of applicable standards in 
section 3(a) and section 3(b) to determine whether they are met or it 
is unreasonable to meet one or more of them. DOE reviewed today's final 
regulations under the standards of section 3 of the Executive Order and 
determined that, to the extent permitted

[[Page 36981]]

by law, they meet the requirements of those standards.

D. Regulatory Flexibility Act

    If an agency is required by law to issue a general NOPR, and if a 
rule has, or is likely to have, a significant negative economic impact 
on a substantial number of small entities, then the Regulatory 
Flexibility Act, 5 U.S.C. 601 et seq., requires preparation of an 
initial and final regulatory flexibility analysis to accompany proposed 
and final rulemakings, respectively. Because the rule published today 
is exempt from notice and comment rulemaking under the Administrative 
Procedure Act, there is no requirement to prepare a regulatory 
flexibility analysis.

E. Review Under the National Environmental Policy Act

    The Department has concluded that this rule falls into a class of 
actions that are categorically excluded from review under the National 
Environmental Policy Act of 1969 (NEPA), 42 U.S.C. 4321, 4331-35, 4341-
47, because they would not individually or cumulatively have a 
significant impact on the human environment as determined by DOE's 
regulations. 10 CFR part 1021, subpart D. Therefore this rule does not 
require preparation of an environmental impact statement or 
environmental assessment pursuant to NEPA.

F. Review Under Unfunded Mandates Reform Act of 1995

    Title II of the Unfunded Mandates Reform Act of 1995, Pub.L. 104-4, 
requires each Federal agency to assess the possible effects of Federal 
regulatory action on state, local, and tribal governments, and the 
private sector of Federal mandates. If a Federal mandate is expected to 
have an impact of $100 million or more in any year, then the mandate is 
significant and the issuing agency is obliged to undertake a detailed 
assessment of costs and benefits. If the Federal mandate is a 
significant intergovernmental mandate, then the issuing agency is 
obliged to provide a meaningful and timely opportunity for affected 
governments to participate in the development of the rule. The final 
regulations in this notice apply only to the conduct of DOE officials 
and do not place regulatory obligations on anyone outside of DOE. 
Accordingly, there are no legal requirements under the Unfunded 
Mandates Reform Act of 1995 that apply to this rulemaking.

G. Review Under Small Business Regulatory Enforcement Fairness Act of 
1996

    Consistent with the Small Business Regulatory Enforcement Fairness 
Act of 1996, DOE will submit to Congress a report regarding the 
issuance of today's final rule prior to the effective date set forth at 
the outset of this notice. The report will note the Office of 
Management and Budget's determination that this rule does not 
constitute a ``major rule'' under that Act. 5 U.S.C. 801, 804.

List of Subjects in 10 CFR Part 430

    Administrative practice and procedure, Energy conservation, 
Household appliances.

    Issued in Washington, DC, on July 9, 1996.
Christine A. Ervin,
Assistant Secretary, Energy Efficiency and Renewable Energy.

    For the reasons set forth in the preamble, Part 430 of Chapter II 
of Title 10, Code of Federal Regulations, is amended as set forth 
below:

PART 430--ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS

    1. The authority cite continues to read as follows:

    Authority: 42 U.S.C. 6291-6309.

    2. Appendix A to Subpart C of Part 430--Procedures, Interpretations 
and Policies for Consideration of New or Revised Energy Conservation 
Standards for Consumer Products--is added as set forth below:

Appendix A to Subpart C of Part 430--Procedures, Interpretations and 
Policies for Consideration of New or Revised Energy Conservation 
Standards for Consumer Products

1. Objectives
2. Scope
3. Setting Priorities for Rulemaking Activity
4. Process for Developing Efficiency Standards and Factors to be 
Considered
5. Policies on Selection of Standards
6. Effective Date of a Standard
7. Test Procedures
8. Joint Stakeholder Recommendations
9. Principles for the Conduct of Engineering Analysis
10. Principles for the Analysis of Impacts on Manufacturers
11. Principles for the Analysis of Impacts on Consumers
12. Consideration of Non-Regulatory Approaches
13. Crosscutting Analytical Assumptions
14. Deviations, Revisions, and Judicial Review

1. Objectives

    This Appendix establishes procedures, interpretations and 
policies to guide the DOE in the consideration and promulgation of 
new or revised appliance efficiency standards under the Energy 
Policy and Conservation Act (EPCA). The Department's objectives in 
establishing these guidelines include:
    (a) Provide for early input from stakeholders. The Department 
seeks to provide opportunities for public input early in the 
rulemaking process so that the initiation and direction of 
rulemakings is informed by comment from interested parties. Under 
the guidelines established by this Appendix, DOE will seek early 
input from interested parties in setting rulemaking priorities and 
structuring the analyses for particular products. Interested parties 
will be invited to provide input for the selection of design options 
and will help DOE identify analysis, data, and modeling needs. DOE 
will gather input from interested parties through a variety of 
mechanisms, including public workshops.
    (b) Increase predictability of the rulemaking timetable. The 
Department seeks to make informed, strategic decisions about how to 
deploy its resources on the range of possible standards development 
activities, and to announce these prioritization decisions so that 
all interested parties have a common expectation about the timing of 
different rulemaking activities. The guidelines in this Appendix 
provide for setting priorities and timetables for standards 
development and test procedure modification and reflect these 
priorities in the Regulatory Agenda.
    (c) Increase use of outside technical expertise. The Department 
seeks to expand its use of outside technical experts in evaluating 
product-specific engineering issues to ensure that decisions on 
technical issues are fully informed. The guidelines in this Appendix 
provide for increased use of outside technical experts in 
developing, performing and reviewing the analyses. Draft analytical 
results will be distributed for peer and stakeholder review.
    (d) Eliminate problematic design options early in the process. 
The Department seeks to eliminate from consideration, early in the 
process, any design options that present unacceptable problems with 
respect to manufacturability, consumer utility, or safety, so that 
the detailed analysis can focus only on viable design options. Under 
the guidelines in this Appendix, DOE will eliminate from 
consideration design options if it concludes that manufacture, 
installation or service of the design will be impractical, or that 
the design option will adversely affect the utility of the product, 
or if the design has adverse safety or health impacts. This 
screening will be done at the outset of a rulemaking.
    (e) Fully consider non-regulatory approaches. The Department 
seeks to understand the effects of market forces and voluntary 
programs on encouraging the purchase of energy efficient products so 
that the incremental impacts of a new or revised standard can be 
accurately assessed and the Department can make informed decisions 
about where standards and voluntary ``market pull'' programs can be 
used most effectively. Under the guidelines in this

[[Page 36982]]

Appendix, DOE will solicit information on the effectiveness of 
market forces and non-regulatory approaches for encouraging the 
purchase of energy efficient products, and will carefully consider 
this information in assessing the benefits of standards. In 
addition, DOE will continue to support voluntary efforts by 
manufacturers, retailers, utilities and others to increase product 
efficiency.
    (f) Conduct thorough analysis of impacts. In addition to 
understanding the aggregate costs and benefits of standards, the 
Department seeks to understand the distribution of those costs and 
benefits among consumers, manufacturers and others, and the 
uncertainty associated with these analyses of costs and benefits, so 
that any adverse impacts on significant subgroups and uncertainty 
concerning any adverse impacts can be fully considered in selecting 
a standard. Under the guidelines in this Appendix, the analyses will 
consider the variability of impacts on significant groups of 
manufacturers and consumers in addition to aggregate costs and 
benefits, report the range of uncertainty associated with these 
impacts, and take into account cumulative impacts of regulation on 
manufacturers.
    (g) Use transparent and robust analytical methods.  The 
Department seeks to use qualitative and quantitative analytical 
methods that are fully documented for the public and that produce 
results that can be explained and reproduced, so that the analytical 
underpinnings for policy decisions on standards are as sound and 
well-accepted as possible. Under the guidelines in this Appendix, 
DOE will solicit input from interested parties in identifying 
analysis, data, and modeling needs with respect to measurement of 
impacts on manufacturers and consumers.
    (h) Articulate policies to guide selection of standards. The 
Department seeks to adopt policies elaborating on the statutory 
criteria for selecting standards, so that interested parties are 
aware of the policies that will guide these decisions. Under the 
guidelines in this Appendix, policies for screening design options, 
selecting candidate standard levels, selecting a proposed standard 
level, and establishing the final standard are established.
    (i) Support efforts to build consensus on standards. The 
Department seeks to encourage development of consensus proposals for 
new or revised standards because standards with such broad-based 
support are likely to balance effectively the economic, energy, and 
environmental interests affected by standards. Under the guidelines 
in this Appendix, DOE will support the development and submission of 
consensus recommendations for standards by representative groups of 
interested parties to the fullest extent possible.
    (j) Reduce time and cost of developing standards. The Department 
seeks to establish a clear protocol for initiating and conducting 
standards rulemakings in order to eliminate time-consuming and 
costly missteps. Under the guidelines in this Appendix, increased 
and earlier involvement by interested parties and increased use of 
technical experts should minimize the need for re-analysis. This 
process should reduce the period between the publication of an 
Advance Notice of Proposed Rulemaking (ANOPR) and the publication of 
a final rule to not more than 18 months, and should decrease the 
government and private sector resources required to complete the 
standard development process.

2. Scope

    (a) The procedures, interpretations and policies described in 
this Appendix will be fully applicable to:
    (1) Rulemakings concerning new or revised Federal energy 
conservation standards for consumer products initiated after August 
14, 1996, and
    (2) Rulemakings concerning new or revised Federal energy 
conservation standards for consumer products that have been 
initiated but for which a Notice of Proposed Rulemaking (NOPR) has 
not been published as of August 14, 1996.
    (b) For rulemakings described in paragraph (a)(2) of this 
section, to the extent analytical work has already been done or 
public comment on an ANOPR has already been provided, such analyses 
and comment will be considered, as appropriate, in proceeding under 
the new process.
    (c) With respect to incomplete rulemakings concerning new or 
revised Federal energy conservation standards for consumer products 
for which a NOPR was published prior to August 14, 1996, the 
Department will conduct a case-by-case review to decide whether any 
of the analytical or procedural steps already completed should be 
repeated. In any case, the approach described in this Appendix will 
be used to the extent possible to conduct any analytical or 
procedural steps that have not been completed.

3. Setting Priorities for Rulemaking Activity

    (a) Priority-setting analysis and development of list of 
priorities. At least once a year, the Department will prepare an 
analysis of each of the factors identified in paragraph (d) of this 
section based on existing literature, direct communications with 
interested parties and other experts, and other available 
information. The results of this analysis will be used to develop 
rulemaking priorities and proposed schedules for the development and 
issuance of all rulemakings. The DOE analysis, priorities and 
proposed rulemaking schedules will be documented and distributed for 
review and comment.
    (b) Public review and comment. Each year, DOE will invite public 
input to review and comment on the priority analysis.
    (c) Issuance of final listing of rulemaking priorities. Each 
fall, the Department will issue, simultaneously with the issuance of 
the Administration's Regulatory Agenda, a final set of rulemaking 
priorities, the accompanying analysis, and the schedules for all 
priority rulemakings that it anticipates within the next two years.
    (d) Factors for priority-setting. The factors to be considered 
by DOE in developing priorities and establishing schedules for 
conducting rulemakings will include:
    (1) Potential energy savings.
    (2) Potential economic benefits.
    (3) Potential environmental or energy security benefits.
    (4) Applicable deadlines for rulemakings.
    (5) Incremental DOE resources required to complete rulemaking 
process.
    (6) Other relevant regulatory actions affecting products.
    (7) Stakeholder recommendations.
    (8) Evidence of energy efficiency gains in the market absent new 
or revised standards.
    (9) Status of required changes to test procedures.
    (10) Other relevant factors.

4. Process for Developing Efficiency Standards and Factors to be 
Considered

    This section describes the process to be used in developing 
efficiency standards and the factors to be considered in the 
process. The policies of the Department to guide the selection of 
standards and the decisions preliminary thereto are described in 
section 5.
    (a) Identifying and screening design options. Once the 
Department has initiated a rulemaking for a specific product but 
before publishing an ANOPR, DOE will identify the product categories 
and design options to be analyzed in detail, and identify those 
design options eliminated from further consideration. Interested 
parties will be consulted to identify key issues, develop a list of 
design options, and to help the Department identify the expertise 
necessary to conduct the analysis.
    (1) Identification of issues for analysis. The Department, in 
consultation with interested parties, will identify issues that will 
be examined in the standards development process.
    (2) Identification of experts and other interested parties for 
peer review. DOE, in consultation with interested parties, will 
identify a group of independent experts and other interested parties 
who can provide expert review of the results of the engineering 
analysis and the subsequent impact analysis.
    (3) Identification and screening of design options. In 
consultation with interested parties, the Department will develop a 
list of design options for consideration. Initially, the candidate 
design options will encompass all those technologies considered to 
be technologically feasible. Following the development of this 
initial list of design options, DOE will review each design option 
based on the factors described in paragraph (a)(4) of this section 
and the policies stated in section 5(b). The reasons for eliminating 
any design option at this stage of the process will be fully 
documented and published as part of the ANOPR. The technologically 
feasible design options that are not eliminated in this screening 
will be considered further in the Engineering Analysis described in 
paragraph (b) of this section.
    (4) Factors for screening of design options. The factors for 
screening design options include:
    (i) Technological feasibility. Technologies incorporated in 
commercial products or in working prototypes will be considered 
technologically feasible.
    (ii) Practicability to manufacture, install and service. If mass 
production of a

[[Page 36983]]

technology in commercial products and reliable installation and 
servicing of the technology could be achieved on the scale necessary 
to serve the relevant market at the time of the effective date of 
the standard, then that technology will be considered practicable to 
manufacture, install and service.
    (iii) Adverse Impacts on Product Utility or Product 
Availability.
    (iv) Adverse Impacts on Health or Safety.
    (5) Selection of contractors. Using the specifications of 
necessary contractor expertise developed in consultation with 
interested parties, DOE will select appropriate contractors, 
subcontractors, and as necessary, expert consultants to perform the 
engineering analysis and the impact analysis.
    (b) Engineering analysis of design options and selection of 
candidate standard levels. After design options are identified and 
screened, DOE will perform the engineering analysis and the benefit/
cost analysis and select the candidate standard levels based on 
these analyses. The results of the analyses will be published in a 
Technical Support Document (TSD) to accompany the ANOPR.
    (1) Identification of engineering analytical methods and tools. 
DOE, in consultation with outside experts, will select the specific 
engineering analysis tools (or multiple tools, if necessary to 
address uncertainty) to be used in the analysis of the design 
options identified as a result of the screening analysis.
    (2) Engineering and life-cycle cost analysis of design options. 
The DOE and its contractor will perform engineering and life-cycle 
cost analyses of the design options.
    (3) Review by expert group and stakeholders. The results of the 
engineering and life-cycle cost analyses will be distributed for 
review by experts and interested parties. If appropriate, a public 
workshop will be conducted to review these results. The analyses 
will be revised as appropriate on the basis of this input.
    (4) New information relating to the factors used for screening 
design options. If further information or analysis leads to a 
determination that a design option, or a combination of design 
options, has unacceptable impacts based on the policies stated in 
section 5(b), that design option or combination of design options 
will not be included in a candidate standard level.
    (5) Selection of candidate standard levels. Based on the results 
of the engineering and life-cycle cost analysis of design options 
and the policies stated in section 5(c), DOE will select the 
candidate standard levels for further analysis.
    (c) Advance Notice of Proposed Rulemaking.
    (1) Documentation of decisions on candidate standard selection. 
(i) If the screening analysis indicates that continued development 
of a standard is appropriate, the Department will publish an ANOPR 
in the Federal Register and will distribute a draft TSD containing 
the analyses performed to this point. The ANOPR will specify 
candidate standard levels but will not propose a particular 
standard. The ANOPR will also include the preliminary analysis of 
consumer life-cycle costs, national net present value, and energy 
impacts for the candidate standard levels based on the engineering 
analysis.
    (ii) If the preliminary analysis indicates that no candidate 
standard level is likely to meet the criteria specified in law, that 
conclusion will be announced. In such cases, the Department may 
decide to proceed with a rulemaking that proposes not to adopt new 
or amended standards, or it may suspend the rulemaking and conclude 
that further action on such standards should be assigned a low 
priority under section 3.
    (2) Public comment and hearing. There will be 75 days for public 
comment on the ANOPR with at least one public hearing or workshop.
    (3) Revisions based on comments. Based on consideration of the 
comments received, any necessary changes to the engineering analysis 
or the candidate standard levels will be made.
    If major changes are required at this stage, interested parties 
and experts will be given an opportunity to review the revised 
analysis.
    (d) Analysis of impacts and selection of proposed standard 
level. After the ANOPR, economic analyses of the impacts of the 
candidate standard levels will be conducted. The Department will 
propose updated standards based on the results of the impact 
analysis.
    (1) Identification of issues for analysis. The Department, in 
consultation with interested parties, will identify issues that will 
be examined in the impacts analysis.
    (2) Identification of analytical methods and tools. DOE, in 
consultation with outside experts, will select the specific economic 
analysis tools (or multiple tools if necessary to address 
uncertainty) to be used in the analysis of the candidate standard 
levels.
    (3) Analysis of impacts. DOE will conduct the analysis of the 
impacts of candidate standard levels including analysis of the 
factors described in paragraphs (d)(7)(ii)-(viii) of this section.
    (4) Review by expert group and stakeholders. The results of the 
analysis of impacts will be distributed for review by experts and 
interested parties. If appropriate, a public workshop will be 
conducted to review these results. The analysis will be revised as 
appropriate on the basis of this input.
    (5) Efforts to develop consensus among stakeholders. If a 
representative group of interested parties undertakes to develop 
joint recommendations to the Department on standards, DOE will 
consider deferring its impact analysis until these discussions are 
completed or until participants in the efforts indicate that they 
are unable to reach a timely agreement.
    (6) Selection of proposed standard level based on analysis of 
impacts. On the basis of the analysis of the factors described in 
paragraph (d)(7) of this section and the policies stated in section 
5(e), DOE will select a proposed standard level.
    (7) Factors to be considered in selecting a proposed standard. 
The factors to be considered in selection of a proposed standard 
include:
    (i) Consensus stakeholder recommendations.
    (ii) Impacts on manufacturers. The analysis of manufacturer 
impacts will include: Estimated impacts on cash flow; assessment of 
impacts on manufacturers of specific categories of products and 
small manufacturers; assessment of impacts on manufacturers of 
multiple product-specific Federal regulatory requirements, including 
efficiency standards for other products and regulations of other 
agencies; and impact on manufacturing capacity, plant closures, and 
loss of capital investment.
    (iii) Impacts on consumers. The analysis of consumer impacts 
will include: Estimated impacts on consumers based on national 
average energy prices and energy usage; assessments of impacts on 
subgroups of consumers based on major regional differences in usage 
or energy prices and significant variations in installation costs or 
performance; sensitivity analyses using high and low discount rates 
and high and low energy price forecasts; consideration of changes to 
product utility and other impacts of likely concern to all or some 
consumers, based to the extent practicable on direct input from 
consumers; estimated life-cycle cost with sensitivity analysis; and 
consideration of the increased first cost to consumers and the time 
required for energy cost savings to pay back these first costs.
    (iv) I
FR Doc. 96-17886 Energy Conservation Program for Consumer Products: Procedures for Consideration of New or Revised Energy Conservation Standards for Consumer Products
mpacts on competition.
    (v) Impacts on utilities. The analysis of utility impacts will 
include estimated marginal impacts on electric and gas utility costs 
and revenues.
    (vi) National energy, economic and employment impacts. The 
analysis of national energy, economic and employment impacts will 
include: Estimated energy savings by fuel type; estimated net 
present value of benefits to all consumers; and estimates of the 
direct and indirect impacts on employment by appliance 
manufacturers, relevant service industries, energy suppliers and the 
economy in general.
    (vii) Impacts on the environment and energy security. The 
analysis of environmental and energy security impacts will include 
estimated impacts on emissions of carbon and relevant criteria 
pollutants, impacts on pollution control costs, and impacts on oil 
use.
    (viii) Impacts of non-regulatory approaches. The analysis of 
energy savings and consumer impacts will incorporate an assessment 
of the impacts of market forces and existing voluntary programs in 
promoting product efficiency, usage and related characteristics in 
the absence of updated efficiency standards.
    (ix) New information relating to the factors used for screening 
design options.
    (e) Notice of Proposed Rulemaking.
    (1) Documentation of decisions on proposed standard selection. 
The Department will publish a NOPR in the Federal Register that 
proposes standard levels and explains the basis for the selection of 
those proposed levels, and will distribute a draft TSD documenting 
the analysis of impacts. As required by Sec. 325(p)(2) of EPCA, the 
NOPR also will describe the maximum improvement in energy efficiency 
or

[[Page 36984]]

maximum reduction in energy use that is technologically feasible 
and, if the proposed standards would not achieve these levels, the 
reasons for proposing different standards.
    (2) Public comment and hearing. There will be 75 days for public 
comment on the NOPR, with at least one public hearing or workshop.
    (3) Revisions to impact analyses and selection of final 
standard. Based on the public comments received and the policies 
stated in section 5(f), DOE will review the proposed standard and 
impact analyses, and make modifications as necessary. If major 
changes to the analyses are required at this stage, interested 
parties and experts will be given an opportunity to review the 
revised analyses.
    (f) Notice of Final Rulemaking. The Department will publish a 
Notice of Final Rulemaking in the Federal Register that promulgates 
standard levels and explains the basis for the selection of those 
standards, accompanied by a final TSD.

5. Policies on Selection of Standards.

    (a) Purpose. (1) Section 4 describes the process that will be 
used to consider new or revised energy efficiency standards and 
lists a number of factors and analyses that will be considered at 
specified points in the process. Department policies concerning the 
selection of new or revised standards, and decisions preliminary 
thereto, are described in this section.
    These policies are intended to elaborate on the statutory 
criteria provided in section 325 of the EPCA, 42 U.S.C. 6295.
    (2) The policies described below are intended to provide 
guidance for making the determinations required by EPCA. This 
statement of policy is not intended to preclude consideration of any 
information pertinent to the statutory criteria. The Department will 
consider all pertinent information in determining whether a new or 
revised standard is consistent with the statutory criteria. 
Moreover, the Department will not be guided by a policy in this 
section if, in the particular circumstances presented, such a policy 
would lead to a result inconsistent with the criteria in section 325 
of EPCA.
    (b) Screening design options. Section 4(a)(4) lists factors to 
be considered in screening design options. These factors will be 
considered as follows in determining whether a design option will 
receive any further consideration:
    (1) Technological feasibility. Technologies that are not 
incorporated in commercial products or in working prototypes will 
not be considered further.
    (2) Practicability to manufacture, install and service. If it is 
determined that mass production of a technology in commercial 
products and reliable installation and servicing of the technology 
could not be achieved on the scale necessary to serve the relevant 
market at the time of the effective date of the standard, then that 
technology will not be considered further.
    (3) Impacts on product utility to consumers. If a technology is 
determined to have significant adverse impact on the utility of the 
product to significant subgroups of consumers, or result in the 
unavailability of any covered product type with performance 
characteristics (including reliability), features, sizes, 
capacities, and volumes that are substantially the same as products 
generally available in the U.S. at the time, it will not be 
considered further.
    (4) Safety of technologies. If it is determined that a 
technology will have significant adverse impacts on health or 
safety, it will not be considered further.
    (c) Identification of candidate standard levels. Based on the 
results of the engineering and cost and benefit analyses of design 
options, DOE will identify the candidate standard levels for further 
analysis. Candidate standard levels will be selected as follows:
    (1) Costs and savings of design options. Design options which 
have payback periods that exceed the average life of the product or 
which cause life-cycle cost increases relative to the base case, 
using typical fuel costs, usage and discount rates, will not be used 
as the basis for candidate standard levels.
    (2) Further information on factors used for screening design 
options. If further information or analysis leads to a determination 
that a design option, or a combination of design options, has 
unacceptable impacts under the policies stated in paragraph (b) of 
this section, that design option or combination of design options 
will not be included in a candidate standard level.
    (3) Selection of candidate standard levels. Candidate standard 
levels, which will be identified in the ANOPR and on which impact 
analyses will be conducted, will be based on the remaining design 
options.
    (i) The range of candidate standard levels will typically 
include:
    (A) The most energy efficient combination of design options;
    (B) The combination of design options with the lowest life-cycle 
cost; and
    (C) A combination of design options with a payback period of not 
more than three years.
    (ii) Candidate standard levels that incorporate noteworthy 
technologies or fill in large gaps between efficiency levels of 
other candidate standard levels also may be selected.
    (d) Advance notice of proposed rulemaking. New information 
provided in public comments on the ANOPR will be considered to 
determine whether any changes to the candidate standard levels are 
needed before proceeding to the analysis of impacts. This review, 
and any appropriate adjustments, will be based on the policies in 
paragraph (c) of this section.
    (e) Selection of proposed standard. Based on the results of the 
analysis of impacts, DOE will select a standard level to be proposed 
for public comment in the NOPR. Section 4(d)(7) lists the factors to 
be considered in selecting a proposed standard level. Section 
325(o)(2)(A) of EPCA provides that any new or revised standard must 
be designed to achieve the maximum improvement in energy efficiency 
that is determined to be technologically feasible and economically 
justified.
    (1) Statutory policies. The fundamental policies concerning 
selection of standards are established in the EPCA, including the 
following:
    (i) A candidate standard level will not be proposed or 
promulgated if the Department determines that it is not 
technologically feasible and economically justified. See EPCA 
section 325(o)(3)(B). A standard level is economically justified if 
the benefits exceed the burdens. See EPCA section 325(o)(2)(B)(i). A 
standard level is rebuttably presumed to be economically justified 
if the payback period is three years or less. See EPCA section 
325(o)(2)(B)(iii).
    (ii) If the Department determines that a standard level is 
likely to result in the unavailability of any covered product type 
with performance characteristics (including reliability), features, 
sizes, capacities, and volumes that are substantially the same as 
products generally available in the U.S. at the time, that standard 
level will not be proposed. See EPCA section 325(o)(4).
    (iii) If the Department determines that a standard level would 
not result in significant conservation of energy, that standard 
level will not be proposed. See EPCA section 325(o)(3)(B).
    (2) Selection of proposed standard on the basis of consensus 
stakeholder recommendations. Development of consensus proposals for 
new or revised standards is an effective mechanism for balancing the 
economic, energy, and environmental interests affected by standards. 
Thus, notwithstanding any other policy on selection of proposed 
standards, a consensus recommendation on an updated efficiency level 
submitted by a group that represents all interested parties will be 
proposed by the Department if it is determined to meet the statutory 
criteria.
    (3) Considerations in assessing economic justification.
    (i) The following policies will guide the application of the 
economic justification criterion in selecting a proposed standard:
    (A) If the Department determines that a candidate standard level 
would result in a negative return on investment for the industry, 
would significantly reduce the value of the industry, or would cause 
significant adverse impacts to a significant subgroup of 
manufacturers (including small manufacturing businesses), that 
standard level will be presumed not to be economically justified 
unless the Department determines that specifically identified 
expected benefits of the standard would outweigh this and any other 
expected adverse effects.
    (B) If the Department determines that a candidate standard level 
would be the direct cause of plant closures, significant losses in 
domestic manufacturer employment, or significant losses of capital 
investment by domestic manufacturers, that standard level will be 
presumed not to be economically justified unless the Department 
determines that specifically identified expected benefits of the 
standard would outweigh this and any other expected adverse effects.
    (C) If the Department determines that a candidate standard level 
would have a significant adverse impact on the environment or energy 
security, that standard level will be presumed not to be

[[Page 36985]]

economically justified unless the Department determines that 
specifically identified expected benefits of the standard would 
outweigh this and any other expected adverse effects.
    (D) If the Department determines that a candidate standard level 
would not result in significant energy conservation relative to non-
regulatory approaches, that standard level will be presumed not to 
be economically justified unless the Department determines that 
other specifically identified expected benefits of the standard 
would outweigh the expected adverse effects.
    (E) If the Department determines that a candidate standard level 
is not consistent with the policies relating to practicability to 
manufacture, consumer utility, or safety in paragraphs (b) (2), (3) 
and (4) of this section, that standard level will be presumed not to 
be economically justified unless the Department determines that 
specifically identified expected benefits of the standard would 
outweigh this and any other expected adverse effects.
    (F) If the Department determines that a candidate standard level 
is not consistent with the policies relating to consumer costs in 
paragraph (c)(1) of this section, that standard level will be 
presumed not to be economically justified unless the Department 
determines that specifically identified expected benefits of the 
standard would outweigh this and any other expected adverse effects.
    (G) If the Department determines that a candidate standard level 
will have significant adverse impacts on a significant subgroup of 
consumers (including low-income consumers), that standard level will 
be presumed not to be economically justified unless the Department 
determines that specifically identified expected benefits of the 
standard would outweigh this and any other expected adverse effects.
    (H) If the Department or the Department of Justice determines 
that a candidate standard level would have significant 
anticompetitive effects, that standard level will be presumed not to 
be economically justified unless the Department determines that 
specifically identified expected benefits of the standard would 
outweigh this and any other expected adverse effects.
    (ii) The basis for a determination that triggers any presumption 
in paragraph (e)(3)(i) of this section and the basis for a 
determination that an applicable presumption has been rebutted will 
be supported by substantial evidence in the record and the evidence 
and rationale for making these determinations will be explained in 
the NOPR.
    (iii) If none of the policies in paragraph (e)(3)(i) of this 
section is found to be dispositive, the Department will determine 
whether the benefits of a candidate standard level exceed the 
burdens considering all the pertinent information in the record.
    (f) Selection of a final standard. New information provided in 
the public comments on the NOPR and any analysis by the Department 
of Justice concerning impacts on competition of the proposed 
standard will be considered to determine whether any change to the 
proposed standard level is needed before proceeding to the final 
rule. The same policies used to select the proposed standard level, 
as described in section 5(e) above, will be used to guide the 
selection of the final standard level.

6. Effective Date of a Standard

    The effective date for new or revised standards will be 
established so that the period between the publication of the final 
rule and the effective date is not less than any period between the 
dates for publication and effective date provided for in EPCA. The 
effective date of any revised standard will be established so that 
the period between the effective date of the prior standard and the 
effective date of such revised standard is not less than period 
between the two effective dates provided for in EPCA.

7. Test Procedures

    (a) Identifying the need to modify test procedures. DOE, in 
consultation with interested parties, experts, and the National 
Institute of Standards and Technology, will attempt to identify any 
necessary modifications to established test procedures when 
initiating the standards development process.
    (b) Developing and proposing revised test procedures. Needed 
modifications to test procedures will be identified in consultation 
with experts and interested parties early in the screening stage of 
the standards development process. Any necessary modifications will 
be proposed before issuance of an ANOPR in the standards development 
process.
    (c) Issuing final test procedure modification. Final, modified 
test procedures will be issued prior to the NOPR on proposed 
standards.
    (d) Effective date of modified test procedures. If required only 
for the evaluation and issuance of updated efficiency standards, 
modified test procedures typically will not go into effect until the 
effective date of updated standards.

8. Joint Stakeholder Recommendations

    (a) Joint recommendations. Consensus recommendations, and 
supporting analyses, submitted by a representative group of 
interested parties will be given substantial weight by DOE in the 
development of a proposed rule. See section 5(e)(2). If the 
supporting analyses provided by the group addresses all of the 
statutory criteria and uses valid economic assumptions and 
analytical methods, DOE expects to use this supporting analyses as 
the basis of a proposed rule. The proposed rule will explain any 
deviations from the consensus recommendations from interested 
parties.
    (b) Breadth of participation. Joint recommendations will be of 
most value to the Department if the participants are reasonably 
representative of those interested in the outcome of the standards 
development process, including manufacturers, consumers, utilities, 
states and representatives of environmental or energy efficiency 
interest groups.
    (c) DOE support of consensus development, including impact 
analyses. In order to facilitate such consensus development, DOE 
will make available, upon request, appropriate technical and legal 
support to the group and will provide copies of all relevant public 
documents and analyses. The Department also will consider any 
requests for its active participation in such discussions, 
recognizing that the procedural requirements of the Federal Advisory 
Committee Act may apply to such participation.

9. Principles for the Conduct of Engineering Analysis

    (a) The purpose of the engineering analysis is to develop the 
relationship between efficiency and cost of the subject product. The 
Department will use the most appropriate means available to 
determine the efficiency/cost relationship, including an overall 
system approach or engineering modeling to predict the improvement 
in efficiency that can be expected from individual design options as 
discussed in the paragraphs below. From this efficiency/cost 
relationship, measures such as payback, life cycle cost, and energy 
savings can be developed. The Department, in consultation with 
interested parties, will identify issues that will be examined in 
the engineering analysis and the types of specialized expertise that 
may be required. With these specifications, DOE will select 
appropriate contractors, subcontractors, and expert consultants, as 
necessary, to perform the engineering analysis and the impact 
analysis. Also, the Department will consider data, information and 
analyses received from interested parties for use in the analysis 
wherever feasible.
    (b) The engineering analysis begins with the list of design 
options developed in consultation with the interested parties as a 
result of the screening process. In consultation with the 
technology/industry expert peer review group, the Department will 
establish the likely cost and performance improvement of each design 
option. Ranges and uncertainties of cost and performance will be 
established, although efforts will be made to minimize uncertainties 
by using measures such as test data or component or material 
supplier information where available. Estimated uncertainties will 
be carried forward in subsequent analyses. The use of quantitative 
models will be supplemented by qualitative assessments as 
appropriate.
    (c) The next step includes identifying, modifying or developing 
any engineering models necessary to predict the efficiency impact of 
any one or combination of design options on the product. A base case 
configuration or starting point will be established as well as the 
order and combination/blending of the design options to be 
evaluated. The DOE, utilizing expert consultants, will then perform 
the engineering analysis and develop the cost efficiency curve for 
the product. The cost efficiency curve and any necessary models will 
be subject to peer review before being issued with the ANOPR.

10. Principles for the Analysis of Impacts on Manufacturers

    (a) Purpose. The purpose of the manufacturer analysis is to 
identify the likely

[[Page 36986]]

impacts of efficiency standards on manufacturers. The Department 
will analyze the impact of standards on manufacturers with 
substantial input from manufacturers and other interested parties. 
The use of quantitative models will be supplemented by qualitative 
assessments by industry experts. This section describes the 
principles that will be used in conducting future manufacturing 
impact analysis.
    (b) Issue identification. In the impact analysis stage (section 
4(d)), the Department, in consultation with interested parties, will 
identify issues that will require greater consideration in the 
detailed manufacturer impact analysis. Possible issues may include 
identification of specific types or groups of manufacturers and 
concerns over access to technology. Specialized contractor 
expertise, empirical data requirements, and analytical tools 
required to perform the manufacturer impact analysis also would be 
identified at this stage.
    (c) Industry characterization. Prior to initiating detailed 
impact studies, the Department will seek input on the present and 
past industry structure and market characteristics. Input on the 
following issues will be sought:
    (1) Manufacturers and their relative market shares;
    (2) Manufacturer characteristics, such as whether manufacturers 
make a full line of models or serve a niche market;
    (3) Trends in the number of manufacturers;
    (4) Financial situation of manufacturers;
    (5) Trends in product characteristics and retail markets; and
    (6) Identification of other relevant regulatory actions and a 
description of the nature and timing of any likely impacts.
    (d) Cost impacts on manufacturers. The costs of labor, material, 
engineering, tooling, and capital are difficult to estimate, 
manufacturer-specific, and usually proprietary. The Department will 
seek input from interested parties on the treatment of cost issues. 
Manufacturers will be encouraged to offer suggestions as to possible 
sources of data and appropriate data collection methodologies. 
Costing issues to be addressed include:
    (1) Estimates of total cost impacts, including product-specific 
costs (based on cost impacts estimated for the engineering analysis) 
and front-end investment/conversion costs for the full range of 
product models.
    (2) Range of uncertainties in estimates of average cost, 
considering alternative designs and technologies which may vary cost 
impacts and changes in costs of material, labor and other inputs 
which may vary costs.
    (3) Variable cost impacts on particular types of manufacturers, 
considering factors such as atypical sunk costs or characteristics 
of specific models which may increase or decrease costs.
    (e) Impacts on product sales, features, prices and cost 
recovery. In order to make manufacturer cash flow calculations, it 
is necessary to predict the number of products sold and their sale 
price. This requires an assessment of the likely impacts of price 
changes on the number of products sold and on typical features of 
models sold. Past analyses have relied on price and shipment data 
generated by economic models. The Department will develop additional 
estimates of prices and shipments by drawing on multiple sources of 
data and experience including: actual shipment and pricing 
experience, data from manufacturers, retailers and other market 
experts, financial models, and sensitivity analyses. The possible 
impacts of candidate standard levels on consumer choices among 
competing fuels will be explicitly considered where relevant.
    (f) Measures of impact. The manufacturer impact analysis will 
estimate the impacts of candidate standard levels on the net cash 
flow of manufacturers. Computations will be performed for the 
industry as a whole and for typical and atypical manufacturers. The 
exact nature and the process by which the analysis will be conducted 
will be determined by DOE, in conjunction with interested parties. 
Impacts to be analyzed include:
    (1) Industry net present value, with sensitivity analyses based 
on uncertainty of costs, sales prices and sales volumes;
    (2) Cash flows, by year;
    (3) Other measures of impact, such as revenue, net income and 
return on equity, as appropriate;
    The characteristics of atypical manufacturers worthy of special 
consideration will be determined in consultation with manufacturers 
and other interested parties and may include: manufacturers 
incurring higher or lower than average costs; and manufacturers 
experiencing greater or fewer adverse impacts on sales. Alternative 
scenarios based on other methods of estimating cost or sales impacts 
also will be performed, as needed.
    (g) Cumulative impacts of other Federal regulatory actions. (1) 
The Department will recognize and seek to mitigate the overlapping 
effects on manufacturers of new or revised DOE standards and other 
regulatory actions affecting the same products. DOE will analyze and 
consider the impact on manufacturers of multiple product-specific 
regulatory actions. These factors will be considered in setting 
rulemaking priorities, assessing manufacturer impacts of a 
particular standard, and establishing the effective date for a new 
or revised standard. In particular, DOE will seek to propose 
effective dates for new or revised standards that are appropriately 
coordinated with other regulatory actions to mitigate any cumulative 
burden.
    (2) If the Department determines that a proposed standard would 
impose a significant impact on product manufacturers within three 
years of the effective date of another DOE standard that imposes 
significant impacts on the same manufacturers (or divisions thereof, 
as appropriate), the Department will, in addition to evaluating the 
impact on manufacturers of the proposed standard, assess the joint 
impacts of both standards on manufacturers.
    (3) If the Department is directed to establish or revise 
standards for products that are components of other products subject 
to standards, the Department will consider the interaction between 
such standards in setting rulemaking priorities and assessing 
manufacturer impacts of a particular standard. The Department will 
assess, as part of the engineering and impact analyses, the cost of 
components subject to efficiency standards.
    (h) Summary of quantitative and qualitative assessments. The 
summary of quantitative and qualitative assessments will contain a 
description and discussion of uncertainties. Alternative estimates 
of impacts, resulting from the different potential scenarios 
developed throughout the analysis, will be explicitly presented in 
the final analysis results.
    (i) Key modeling and analytical tools. In its assessment of the 
likely impacts of standards on manufacturers, the Department will 
use models which are clear and understandable, feature accessible 
calculations, and have assumptions that are clearly explained. As a 
starting point, the Department will use the Government Regulatory 
Impact Model (GRIM). The Department will consider any enhancements 
to the GRIM that are suggested by interested parties. If changes are 
made to the GRIM methodology, DOE will provide notice and seek 
public input. The Department will also support the development of 
economic models for price and volume forecasting. Research required 
to update key economic data will be considered.

11. Principles for the Analysis of Impacts on Consumers

    (a) Early consideration of impacts on consumer utility. The 
Department will consider at the earliest stages of the development 
of a standard whether particular design options will lessen the 
utility of the covered products to the consumer. See section 4(a).
    (b) Impacts on product availability. The Department will 
determine, based on consideration of information submitted during 
the standard development process, whether a proposed standard is 
likely to result in the unavailability of any covered product type 
with performance characteristics (including reliability), features, 
sizes, capacities, and volumes that are substantially the same as 
products generally available in the U.S. at the time. DOE will not 
promulgate a standard if it concludes that it would result in such 
unavailability.
    (c) Department of justice review. As required by law, the 
Department will solicit the views of the Justice Department on any 
lessening of competition that is likely to result from the 
imposition of a proposed standard and will give the views provided 
full consideration in assessing economic justification of a proposed 
standard. In addition, DOE may consult with the Department of 
Justice at earlier stages in the standards development process to 
seek to obtain preliminary views on competitive impacts.
    (d) Variation in consumer impacts. The Department will use 
regional analysis and sensitivity analysis tools, as appropriate, to 
evaluate the potential distribution of impacts of candidate 
standards levels among different subgroups of consumers. The 
Department will consider impacts on significant segments

[[Page 36987]]

of consumers in determining standards levels. Where there are 
significant negative impacts on identifiable subgroups, DOE will 
consider the efficacy of voluntary approaches as a means to achieve 
potential energy savings.
    (e) Payback period and first cost. (1) In the assessment of 
consumer impacts of standards, the Department will consider Life-
Cycle Cost, Payback Period and Cost of Conserved Energy to evaluate 
the savings in operating expenses relative to increases in purchase 
price. The Department intends to increase the level of sensitivity 
analysis and scenario analysis for future rulemakings. The results 
of these analyses will be carried throughout the analysis and the 
ensuing uncertainty described.
    (2) If, in the analysis of consumer impacts, the Department 
determines that a candidate standard level would result in a 
substantial increase in the product first costs to consumers or 
would not pay back such additional first costs through energy cost 
savings in less than three years, Department will specifically 
assess the likely impacts of such a standard on low-income 
households, product sales and fuel switching.

12. Consideration of Non-Regulatory Approaches

    (a) The Department recognizes that voluntary or other non-
regulatory efforts by manufacturers, utilities and other interested 
parties can result in substantial efficiency improvements. The 
Department intends to consider fully the likely effects of non-
regulatory initiatives on product energy use, consumer utility and 
life cycle costs, manufacturers, competition, utilities and the 
environment, as well as the distribution of these impacts among 
different regions, consumers, manufacturers and utilities. DOE will 
attempt to base its assessment on the actual impacts of such 
initiatives to date, but also will consider information presented 
regarding the impacts that any existing initiative might have in the 
future. Such information is likely to include a demonstration of the 
strong commitment of manufacturers, distribution channels, utilities 
or others to such voluntary efficiency improvements. This 
information will be used in assessing the likely incremental impacts 
of establishing or revising standards, in assessing appropriate 
effective dates for new or revised standards and in considering DOE 
support of non-regulatory initiatives.
    (b) DOE believes that non-regulatory approaches are valuable 
complements to the standards program. In particular, DOE will 
consider pursuing voluntary programs where it appears that highly 
efficient products can obtain a significant market share but less 
efficient products cannot be eliminated altogether because, for 
instance, of unacceptable adverse impacts on a significant subgroup 
of consumers. In making this assessment, the Department will 
consider the success more efficient designs have had in the market, 
their acceptance to date, and their potential market penetration.

13. Crosscutting Analytical Assumptions

    In selecting values for certain crosscutting analytical 
assumptions, DOE expects to continue relying upon the following 
sources and general principles:
    (a) Underlying economic assumptions. The appliance standards 
analyses will generally use the same economic growth and development 
assumptions that underlie the most current Annual Energy Outlook 
(AEO) published by the Energy Information Administration (EIA).
    (b) Energy price and demand trends. Analyses of the likely 
impact of appliance standards on typical users will generally adopt 
the mid-range energy price and demand scenario of the EIA's most 
current AEO. The sensitivity of such estimated impacts to possible 
variations in future energy prices are likely to be examined using 
the EIA's high and low energy price scenarios.
    (c) Product-specific energy-efficiency trends, without updated 
standards. Product specific energy-efficiency trends will be based 
on a combination of the efficiency trends forecast by the EIA's 
residential and commercial demand model of the National Energy 
Modeling System (NEMS) and product-specific assessments by DOE and 
its contractors with input from interested parties.
    (d) Discount rates. For residential and commercial consumers, 
ranges of three different real discount rates will be used. For 
residential consumers, the mid-range discount rate will represent 
DOE's approximation of the average financing cost (or opportunity 
costs of reduced savings) experienced by typical consumers. 
Sensitivity analyses will be performed using discount rates 
reflecting the costs more likely to be experienced by residential 
consumers with little or no savings and credit card financing and 
consumers with substantial savings. For commercial users, a mid-
range discount rate reflecting the DOE's approximation of the 
average real rate of return on commercial investment will be used, 
with sensitivity analyses being performed using values indicative of 
the range of real rates of return likely to be experienced by 
typical commercial businesses. For national net present value 
calculations, DOE would use the Administration's approximation of 
the average real rate of return on private investment in the U.S. 
economy. For manufacturer impacts, DOE plans to use a range of real 
discount rates which are representative of the real rates of return 
experienced by typical U.S. manufacturers affected by the program.
    (e) Environmental impacts. The emission rates of carbon, sulfur 
oxides and nitrogen oxides used by DOE to calculate the physical 
quantities of emissions likely to be avoided by candidate standard 
levels will be based on the current average carbon emissions of the 
U.S. electric utilities and on the projected rates of emissions of 
sulfur and nitrogen oxides. Projected rates of emissions, if 
available, will be used for the estimation of any other 
environmental impacts. The Department will consider the effects of 
the proposed standards on these emissions in reaching a decision 
about whether the benefits of the proposed standards exceed their 
burdens but will not determine the monetary value of these 
environmental externalities.

14. Deviations, Revisions, and Judicial Review

    (a) Deviations. This Appendix specifies procedures, 
interpretations and policies for the development of new or revised 
energy efficiency standards in considerable detail. As the approach 
described in this Appendix is applied to the development of 
particular standards, the Department may find it necessary or 
appropriate to deviate from these procedures, interpretations or 
policies. If the Department concludes that such deviations are 
necessary or appropriate in a particular situation, DOE will provide 
interested parties with notice of the deviation and an explanation.
    (b) Revisions. If the Department concludes that changes to the 
procedures, interpretations or policies in this Appendix are 
necessary or appropriate, DOE will provide notice in the Federal 
Register of modifications to this Appendix with an accompanying 
explanation. DOE expects to consult with interested parties prior to 
any such modification.
    (c) Judicial review. The procedures, interpretations, and 
policies stated in this Appendix are not intended to establish any 
new cause of action or right to judicial review.

[FR Doc. 96-17886 Filed 7-12-96; 8:45 am]
BILLING CODE 6450-01-P

Complete official Federal Register PDF

FR Doc. 96-17873 Personnel Appeals Board; Procedural Regulations
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36809-36811]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17873]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 136 / Monday, July 15, 1996 / Rules 
and Regulations

[[Page 36809]]

GENERAL ACCOUNTING OFFICE

4 CFR Parts 28 and 29

Personnel Appeals Board; Procedural Regulations

AGENCY: General Accounting Office Personnel Appeals Board.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The General Accounting Office Personnel Appeals Board is 
issuing a final rule to govern appeals of employees who are separated 
from employment as a result of a Reduction in Force (RIF) action. The 
rule is published according to the Board's authority under section 
753(d) of the General Accounting Office Personnel Act of 1980 (GAOPA). 
The revision provides affected employees with an optional streamlined 
process for pursuing appeals of RIF-based terminations.

EFFECTIVE DATE: July 15, 1996.

FOR FURTHER INFORMATION CONTACT: Catherine McNamara, Solicitor, 
Personnel Appeals Board, 202-512-6137.

SUPPLEMENTARY INFORMATION: The Personnel Appeals Board (PAB) authority 
with respect to employment practices within the General Accounting 
Office (GAO or the agency) includes authority over appeals from RIF 
actions taken by the agency. The GAO recently revised Order 2351.1, 
Reduction in Force, applicable to GAO employees.
    The PAB has long had published regulations which define the role of 
its Office of General Counsel (PAB/OGC) and the procedures to be 
followed in pursuing an appeal before the Board. See 4 CFR part 28. 
Previous regulations required that in all cases an individual obtain a 
Right to Appeal Letter from the PAB's Office of General Counsel before 
filing with the Board. See 4 CFR 28.18(a). The Board or an 
administrative judge can waive a PAB regulation in an individual case 
for good cause shown, consistent with the requirements of the GAOPA. 4 
CFR 28.16(b).
    On March 7, 1996, the Board adopted interim regulations (61 FR 
9089) to provide employees who are separated from employment as a 
result of a RIF action with the option of appealing directly to the PAB 
without first filing a charge with the Board's Office of General 
Counsel, as prescribed in Sec. 28.11 of this part, and obtaining a 
Right to Appeal Letter. This change was designed to expedite the appeal 
process, at the employee's option, in situations in which the RIF 
action results in separation from employment. Because of the need to 
have regulations in place prior to agency implementation of its RIF 
order, the revisions were made effective immediately on an interim 
basis. With several modifications as explained below, the regulations 
are adopted as final. Because the appeal period for recent RIF action 
at GAO is currently running, this final rule is made effective 
immediately.

Brief Summary of the Interim Regulations

    The interim regulations published by the Board on March 7, 1996, 
contained a new Sec. 28.13, defining a special procedure for actions 
challenging a RIF-based termination to bypass the PAB/OGC at the option 
of the employee. See 61 FR 9089 (March 7, 1996). In addition, the 
interim regulations amended Sec. 28.18, paragraphs (a) and (b), to 
specify that a person whose employment was terminated as a result of a 
RIF action may choose to file directly with the Board, and that such an 
action must be filed within 30 days of the effective date of the RIF 
action.
    The PAB invited comments from the public through May 31, 1996, and 
stated that it would carefully consider such comments before the 
regulations were adopted in final form. See 61 FR 9089. In addition to 
publishing the interim regulations in the Federal Register, the PAB 
also provided GAO employees with notice of the revised procedures, 
applicable to individuals separated from employment because of a RIF, 
by means of a summary of the changes in the ``GAO Management News.'' 
See GAO Management News, Vol. 23, No. 25 (Week of April 8-12, 1996).
    The Board received one comment concerning the interim regulations. 
That comment, submitted by Patricia Shahen, Acting Director of GAO's 
Affirmative Action/Civil Rights Office, addressed a perceived ambiguity 
in the regulations as revised. The perceived ambiguity involved whether 
an employee raising discrimination issues in challenging a RIF-based 
separation may bypass the Civil Rights Office as well as the PAB/OGC.
    In revised Sec. 28.13, the Board streamlined the appeal process for 
employees separated by a RIF by allowing them to file directly with the 
Board without first filing a charge with the PAB's Office of General 
Counsel. Ms. Shahen's comment pointed out that under 4 CFR 28.98(a), 
employees raising charges of prohibited discrimination are required to 
file a discrimination complaint with GAO's Civil Rights Office before 
filing such a complaint with the PAB General Counsel. Section 28.98(c) 
provides an exception to this rule for employees affected by a removal, 
suspension for more than 14 days, reduction in grade or pay, or 
furlough of not more than 30 days. If an employee alleges that the 
subject action was due at least in part to unlawful discrimination, he 
or she may elect to file a charge directly with the PAB General 
Counsel. The comment pointed out that the exception in Sec. 28.98(c) 
does not specifically refer to RIF actions.
    Ms. Shahen expressed concern that the revised regulations ``could 
be interpreted to mean that employees who allege discrimination because 
of a RIF, may go directly to the Board without going through the Civil 
Rights Office process; but if they want to go through the PAB General 
Counsel, they must first go through the Civil Rights Office process. 
This does not seem to be the intent of the proposed regulation.''

Summary of Changes

    After carefully considering the comment received, the Board has 
adopted several modifications to the regulations to clarify their 
effect on RIF-based termination actions raising discrimination claims. 
In addition, conforming changes were made to assure that the 
streamlined procedures would be available to Board employees, and 
several technical changes were made to reflect a revision to the 
Board's address.
    Section 28.13, added in the interim regulations, is revised to 
clarify that individuals raising discrimination issues in RIF-based 
actions may avail

[[Page 36810]]

themselves of the streamlined procedures which allow bypassing the PAB/
OGC. The revised section also specifies that, pursuant to Sec. 28.98, 
such individuals also may bypass the agency Civil Rights Office in the 
interest of reaching an expeditious resolution of their complaints.
    Section 28.98, which was not specifically addressed in the interim 
regulations, is amended to clarify that in RIF-based actions raising 
discrimination claims, an employee may elect to (1) file directly with 
the PAB/OGC, (2) proceed through the agency's discrimination complaint 
processing system, or (3) file directly with the PAB, thus bypassing 
both the PAB/OGC and the Civil Rights Office. The Board notes that when 
Sec. 28.98(c) was published for comment, the agency did not object to 
the change which gave employees a choice of procedures for adverse or 
performance-based actions alleged to be due to discrimination. See 58 
FR 61988, 61990-91 (November 23, 1993).
    In reconsidering the regulatory revisions, the Board also concluded 
that a further change was necessary to clarify that PAB personnel may 
avail themselves of the streamlined procedures for pursuing RIF-based 
termination appeals. Section 28.17(a) was revised to specify that Board 
employees, whether or not raising equal employment opportunity (EEO) 
claims, may choose to file an appeal of a RIF-based termination 
directly with the PAB.
    Several technical changes were made in 4 CFR parts 28 and 29 to 
reflect the Board's change of address. These sections specify where to 
file at the PAB or the PAB/OGC: Secs. 28.11(c) (1) and (2); 28.18(c) 
(1) and (2); 28.86(b) (1) and (2); 29.8(c) (1) and (2); and 29.10(c) 
(1) and (2).
    Accordingly, 4 CFR parts 28 and 29 are amended and the interim rule 
amending title 4, part 28, Code of Federal Regulations, which was 
published at 61 FR 9089 on March 7, 1996, is adopted as final, with 
changes as follows.

List of Subjects

4 CFR Part 28

    Administrative practice and procedure, Equal employment 
opportunity, Government employees, Labor-management relations, 
Reductions in force.

4 CFR Part 29

    Administrative practice and procedure, Equal employment 
opportunity, Government employees.

PART 28--GENERAL ACCOUNTING OFFICE PERSONNEL APPEALS BOARD; 
PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT PRACTICES AT 
THE GENERAL ACCOUNTING OFFICE

    1. The authority citation for part 28 continues to read as follows:

    Authority: 31 U.S.C. 753.

    2. Section 28.11, paragraph (c)(1) and the first sentence of 
paragraph (c)(2) are revised to read as follows:

Sec. 28.11  Filing a charge with the General Counsel.

* * * * *
    (c) * * *
    (1) Filing in person: A charge may be filed in person at the Office 
of the General Counsel, Suite 580, Union Center Plaza II, 820 First 
Street, NE., Washington, DC.
    (2) Filing by mail: A charge may be filed by mail addressed to the 
General Counsel, Personnel Appeals Board, Suite 580, Union Center Plaza 
II, 441 G Street, NW., Washington, DC 20548. * * *
* * * * *
    3. Section 28.13 is revised to read as follows:

Sec. 28.13  Special procedure for Reduction in Force.

    In the event of a Reduction in Force resulting in an individual's 
separation from employment, an aggrieved employee may choose to file an 
appeal directly with the Personnel Appeals Board, without first filing 
the charge with the PAB's Office of General Counsel pursuant to 
Sec. 28.11. This option is available to individuals raising 
discrimination issues in connection with a RIF action. Pursuant to 
Sec. 28.98, such individuals need not file a complaint with GAO's Civil 
Rights Office before pursuing a RIF challenge alleging discrimination, 
either by filing directly with the PAB or by filing a charge with the 
PAB's Office of General Counsel.
    4. In Sec. 28.17, paragraphs (a)(2) and (a)(3) are revised to read 
as follows:

Sec. 28.17  Internal appeals of Board employees.

    (a) * * *
    (1) * * *
    (2) When an employee of the Board believes that he or she has been 
denied his or her right to equal employment opportunity, the employee 
shall consult either with the Solicitor or with the General Counsel and 
seek advice on filing an EEO complaint. If the matter cannot be 
resolved within 10 days, the Solicitor or General Counsel shall notify 
the employee of his or her right to file an EEO complaint. The employee 
shall have 20 days from service of this notice to file an EEO complaint 
with the General Counsel. Upon receipt of an EEO complaint, the General 
Counsel shall arrange for processing in accordance with paragraph (b) 
of this section. If the EEO allegations involve challenge to a RIF-
based separation, the employee may choose to expedite the procedures by 
filing a charge directly with the Board.
    (3) When an employee of the Board wishes to raise any other issue 
that would be subject to the Board's jurisdiction, the employee shall 
file a charge with the General Counsel and the General Counsel shall 
arrange for processing in accordance with paragraph (b) of this 
section. If the challenged action is a RIF-based separation from 
employment, the employee may choose to expedite the procedures by 
filing a charge directly with the Board.
* * * * *
    5. Section 28.18, paragraph (c)(1) and the first sentence of 
paragraph (c)(2) are revised as follows:

Sec. 28.18  Filing a petition for review with the Board.

* * * * *
    (c) * * *
    (1) Filing in person: A petition may be filed in person at the 
office of the Board, Suite 560, Union Center Plaza II, 820 First Street 
NE., Washington, DC.
    (2) Filing by mail: A petition may be filed by mail addressed to 
the Personnel Appeals Board, Suite 560, Union Center Plaza II, 441 G 
Street NW., Washington, DC 20548. * * *
* * * * *
    6. Section 28.86, paragraph (b)(1) and the first sentence of 
paragraph (b)(2) are revised to read as follows:

Sec. 28.86  Board procedures; recommended decisions.

* * * * *
    (b) * * *
    (1) Filing by hand delivery: Exceptions may be filed by hand 
delivery at the office of the Board, Suite 560, Union Center Plaza II, 
820 First Street NE., Washington, DC.
    (2) Filing by mail: Exceptions may be filed by mail addressed to 
the Personnel Appeals Board, Suite 560, Union Center Plaza II, 441 G 
Street, NW., Washington DC 20548. * * *
* * * * *
    7. Section 28.98 is amended by redesignating paragraph (d) as 
(e)(1), by adding new paragraphs (d) and (e)(2), by revising the 
paragraph heading of

[[Page 36811]]

paragraph (c) and by revising newly redesignated paragraph(e)(1) as 
follows:

Sec. 28.98  Individual charges in EEO cases.

* * * * *
    (c) Special rules for adverse and performance based actions. * * *
    (d) Special rules for RIF based actions. An individual alleging 
discrimination issues in connection with a RIF-based separation may 
follow the procedures outlined above in paragraph (c) of this section 
for adverse and performance based actions, or may choose instead a 
third option. In accordance with the provisions of Sec. 28.13, such an 
individual may appeal that action by filing directly with the PAB, thus 
bypassing both the Civil Rights Office and the PAB's Office of General 
Counsel.
    (e)(1) The charging party shall file the charge with the General 
Counsel in accordance with Sec. 28.11. The General Counsel shall 
investigate the charge in accordance with Sec. 28.12.
    (2) A charging party challenging a RIF action by filing directly 
with the PAB shall follow the procedures prescribed in Sec. 28.13 and 
Sec. 28.18.
* * * * *

PART 29--GENERAL ACCOUNTING OFFICE PERSONNEL APPEALS BOARD; 
PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT AT THE 
ARCHITECT OF THE CAPITOL

    8. The authority citation for part 29 continues to read as follows:

    Authority: 31 U.S.C. 753.

    9. Section 29.8, paragraph (c)(1) and the first sentence of 
paragraph (c)(2) are revised to read as follows:

Sec. 29.8  Filing a charge with the General Counsel.

* * * * *
    (c) * * *
    (1) Filing in person: A charge may be filed in person at the Office 
of the General Counsel, Suite 580, Union Center Plaza II, 820 First St. 
NE., Washington, DC.
    (2) Filing by mail: A charge may be filed by mail addressed to the 
General Counsel, Personnel Appeals Board, Suite 580, Union Center Plaza 
II, 441 G Street, NW., Washington, DC 20548. * * *
* * * * *
    10. Section 29.10, paragraph (c)(1) and the first sentence of 
paragraph (c)(2) are revised to read as follows:

Sec. 29.10   Filing a petition for review with the Board.

* * * * *
    (c) * * *
    (1) Filing in person: A petition may be filed in person at the 
office of the Board, Suite 560, Union Center Plaza II, 820 First Street 
NE., Washington, DC.
    (2) Filing by mail: A petition may be filed by mail addressed to 
the Personnel Appeals Board, Suite 560, Union Center Plaza II, 441 G 
Street, NW., Washington DC 20548. * * *
* * * * *
Nancy A. McBride,
Chair, Personnel Appeals Board General Accounting Office.
[FR Doc. 96-17873 Filed 7-12-96; 8:45 am]
BILLING CODE 1610-01-P

Complete official Federal Register PDF

FR Doc. 96-17869 Raisins Produced From Grapes Grown in California; Final Free and Reserve Percentages for the 1995-96 Crop Year for Natural (Sun-Dried) Seedless, Zante Currant, and Other Seedless Raisins
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36814-36816]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17869]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
7 CFR Part 989

[FV96-989-1FIR]

Raisins Produced From Grapes Grown in California; Final Free and 
Reserve Percentages for the 1995-96 Crop Year for Natural (Sun-Dried) 
Seedless, Zante Currant, and Other Seedless Raisins

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (Department) is adopting as a 
final rule, without change, the provisions of an interim final rule 
which established final free and reserve percentages for 1995-96 crop 
Natural (sun-dried) Seedless (NS), Zante Currant (ZC), and Other 
Seedless (OS) raisins. The percentages are 79 percent free and 21 
percent reserve, 70 percent free and 30 percent reserve, and 51 percent 
free and 49 percent reserve for NS, ZC, and OS raisins, respectively. 
These percentages are intended to stabilize supplies and prices and to 
help counter the destabilizing effects of the burdensome oversupply 
situation facing the raisin industry. This rule was unanimously 
recommended by the Raisin Administrative Committee (Committee), the 
body which locally administers the marketing order.

EFFECTIVE DATE: August 14, 1996.

FOR FURTHER INFORMATION CONTACT: Richard P. Van Diest, Marketing 
Specialist, California Marketing Field Office, Fruit and Vegetable 
Division, AMS, USDA, 2202 Monterey Street, suite 102B, Fresno, 
California 93721; telephone: 209-487-5901 or Mark A. Slupek, Marketing 
Specialist, Marketing Order Administration Branch, Fruit and Vegetable 
Division, AMS, USDA, room 2523-S, P.O. Box 96456, Washington, DC 20090-
6456; telephone: 202-205-2830.

[[Page 36815]]

SUPPLEMENTARY INFORMATION: This final rule is issued under marketing 
agreement and Order No. 989 (7 CFR part 989), both as amended, 
regulating the handling of raisins produced from grapes grown in 
California, hereinafter referred to as the ``order.'' The order is 
effective under the Agricultural Marketing Agreement Act of 1937, as 
amended (7 U.S.C. 601-674), hereinafter referred to as the ``Act.''
    The Department of Agriculture (Department) is issuing this rule in 
conformance with Executive Order 12866.
    This rule has been reviewed under Executive Order 12778, Civil 
Justice Reform. Under the marketing order provisions now in effect, 
final free and reserve percentages may be established for raisins 
acquired by handlers during the crop year. This action finalizes final 
free and reserve percentages for NS, ZC, and OS raisins for the 1995-96 
crop year, beginning August 1, 1995, through July 31, 1996. This final 
rule will not preempt any State or local laws, regulations, or 
policies, unless they present an irreconcilable conflict with this 
rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and requesting a modification of the order or to be exempt 
therefrom. Such handler is afforded the opportunity for a hearing on 
the petition. After the hearing, the Secretary would rule on the 
petition. The Act provides that the district court of the United States 
in any district in which the handler is an inhabitant, or has his/her 
principal place of business, has jurisdiction to review the Secretary's 
ruling on the petition, provided an action is filed not later than 20 
days after the date of the entry of the ruling.
    An interim final rule was published in the Federal Register on 
February 26, 1996 (61 FR 7067), with an effective date of February 26, 
1996. That rule established final free and reserve percentages for NS, 
ZC, and OS raisins for the 1995-96 crop year. The percentages were 
established in a new section 989.249 of the rules and regulations in 
effect under the marketing order. That rule provided a 30-day comment 
period which ended March 27, 1996. No comments were received.
    The order prescribes procedures for computing trade demands and 
preliminary and final percentages that establish the amount of raisins 
that can be marketed throughout the season. The regulations apply to 
all handlers of California raisins. Raisins in the free percentage 
category may be shipped immediately to any market, while reserve 
raisins must be held by handlers in a reserve pool for the account of 
the Committee. Under the order, reserve raisins may be: Sold at a later 
date by the Committee to handlers for free use; used in diversion 
programs; exported to authorized countries; carried over as a hedge 
against a short crop the following year; or disposed of in other 
outlets noncompetitive with those for free tonnage raisins.
    While this rule continues in effect restrictions limiting the 
amount of NS, ZC, and OS raisins that enter domestic markets, final 
free and reserve percentages are intended to lessen the impact of the 
oversupply situation facing the industry and promote stronger marketing 
conditions, thus stabilizing prices and supplies and improving grower 
returns. In addition to the quantity of raisins released under the 
preliminary percentages and the final percentages, the order specifies 
methods to make available additional raisins to handlers by requiring 
sales of reserve pool raisins for use as free tonnage raisins under 
``10 plus 10'' offers, and authorizing sales of reserve raisins under 
certain conditions.
    The Department's ``Guidelines for Fruit, Vegetable, and Specialty 
Crop Marketing Orders'' specifies that 110 percent of recent years' 
sales should be made available to primary markets each season before 
recommendations for volume regulation are approved. This goal is met by 
the establishment of a final percentage which makes available 100 
percent of the computed trade demand and the additional offering of 
reserve raisins to handlers under ``10 plus 10'' offers. The ``10 plus 
10'' offers are two simultaneous offers of reserve pool raisins which 
are made available to handlers each season. For each such offer, a 
quantity of raisins equal to 10 percent of the prior year's shipments 
is made available for free use. A total of 62,578 tons of NS, 960 tons 
of ZC, and 638 tons of OS were purchased by handlers for free use 
pursuant to these offers.
    Pursuant to section 989.54(a) of the order, the Committee met on 
August 15, 1995, to review shipment and inventory data, and other 
matters relating to the supplies of raisins of all varietal types. The 
Committee computed a trade demand for each varietal type for which a 
free tonnage percentage might be recommended. The trade demand is 90 
percent of the prior year's shipments of free tonnage and reserve 
tonnage raisins sold for free use for each varietal type into all 
market outlets, adjusted by subtracting the carryin of each varietal 
type on August 1 of the current crop year and by adding to the trade 
demand the desirable carryout for each varietal type at the end of that 
crop year. As specified in section 989.154, the desirable carryout for 
each varietal type shall be equal to the shipments of free tonnage 
raisins of the prior crop year during the months of August, September, 
and one fourth of October. If the prior year's shipments are limited 
because of crop conditions, the total shipments during that period of 
time during one of the three years preceding the prior crop year may be 
used. In accordance with these provisions, the Committee computed and 
announced 1995-96 trade demands of 257,314 tons, 2,208 tons, and 1,047 
tons for NS, ZC, and OS raisins, respectively.
    As required under section 989.54(b) of the order, the Committee met 
on October 3, 1995, and computed and announced preliminary crop 
estimates and preliminary free and reserve percentages for NS and ZC 
raisins which released 65 percent of the trade demand since the field 
prices had not been established, and 85 percent of the trade demand for 
OS raisins because the field price had been established. The 
preliminary crop estimates and preliminary free and reserve percentages 
were as follows: 335,118 tons, 50 percent free, and 50 percent reserve 
for NS raisins; 3,696 tons, 39 percent free, and 61 percent reserve for 
ZC raisins; and 2,197 tons, 40 percent free, and 60 percent reserve for 
OS raisins. The Committee authorized the Committee staff to modify the 
preliminary percentages to release 85 percent of the trade demand when 
the field prices were established for NS and ZC raisins. The 
preliminary percentages for NS and ZC raisins were adjusted soon 
thereafter to 65 percent free, 35 percent reserve, and 51 percent free 
and 49 percent reserve, respectively.
    Also at that meeting, the Committee computed and announced 
preliminary crop estimates and preliminary free and reserve percentages 
for Dipped Seedless, Oleate and Related Seedless, Golden Seedless, 
Sultana, Muscat, and Monukka raisins. It determined that the supplies 
of these varietal types would be less than or close enough to the 
computed trade demands for each variety, and that volume control 
percentages would not be necessary to maintain market stability for 
these varietal types.

[[Page 36816]]

    On January 12, 1996, the Committee recommended final percentages of 
79 percent free, 21 percent reserve for NS raisins; 70 percent free, 30 
percent reserve for ZC raisins; and 51 percent free, 49 percent reserve 
for OS raisins.
    Pursuant to section 989.54(c), the Committee may adopt interim free 
and reserve percentages. Interim percentages may release less than the 
computed trade demand for each varietal type. The Committee also 
computed interim free and reserve percentages at the January 12, 1996, 
meeting. Interim percentages were announced as 78.75 percent free, 
21.25 percent reserve for NS raisins; 69.75 percent free, 30.25 percent 
reserve for ZC raisins; and 50.75 percent free, 49.25 percent reserve 
for OS raisins. That action released most, but not all, of the computed 
trade demand for NS, ZC, and OS raisins.
    Under section 989.54(d) of the order, the Committee is required to 
recommend to the Secretary, no later than February 15 of each crop 
year, final free and reserve percentages which, when applied to the 
final production estimate of a varietal type, will tend to release the 
full trade demand for any varietal type.
    The Committee's final estimate of 1995-96 production of NS raisins 
is 325,808 tons. Dividing the computed trade demand of 257,314 tons by 
the final estimate of production results in a final free percentage of 
79 percent and a final reserve percentage of 21 percent for NS raisins.
    The Committee's final estimate of 1995-96 production of ZC raisins 
is 3,158 tons. Dividing the computed trade demand of 2,208 tons by the 
final estimate of production results in a final free percentage of 70 
percent and a final reserve percentage of 30 percent for ZC raisins.
    The Committee's final estimate of 1995-96 production of OS raisins 
is 2,048 tons. Dividing the computed trade demand of 1,047 tons by the 
final estimate of production results in a final free percentage of 51 
percent and a final reserve percentage of 49 percent for OS raisins.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this action on small entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and rules issued thereunder, are unique in that 
they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are approximately 20 handlers of California raisins who are 
subject to regulation under the raisin marketing order, and 
approximately 4,500 producers in the production area. Small 
agricultural service firms have been defined by the Small Business 
Administration (13 CFR 121.601) as those whose annual receipts (from 
all sources) are less than $5,000,000, and small agricultural producers 
are defined as those having annual receipts of less than $500,000. No 
more than eight handlers, and a majority of producers, of California 
raisins may be classified as small entities. Twelve of the 20 handlers 
subject to regulation have annual sales estimated to be at least 
$5,000,000, and the remaining eight handlers have sales less than 
$5,000,000, excluding receipts from any other sources.
    In recent years, the California raisin industry has been faced with 
a burdensome oversupply. A major reason for its oversupply problem is 
that wineries have not been purchasing as many raisin variety grapes. 
Raisin variety grapes which wineries will not buy generally are dried 
into raisins. The volume control procedures specified in the order 
provide a means of lessening the impact of year-to-year variations in 
raisin supplies on producer prices. The percentages contribute toward 
orderly marketing and market stability.
    The free and reserve percentages established by the interim final 
rule, and continued in effect, without change, by this rule, apply 
uniformly to all handlers in the industry, whether small or large, and 
release the full trade demand. There are no known additional costs 
incurred by small handlers that are not incurred by large handlers. As 
the season progressed, additional quantities of the trade demand were 
released. For some varieties of raisins, no volume control was 
implemented.
    Although raisin markets are limited, they are available to all 
handlers, regardless of size. While the level of benefits of this 
action are difficult to quantify, the stabilizing effects of the 
percentages impact both small and large handlers positively by helping 
them maintain and expand markets even though raisin supplies fluctuate 
from season to season. Between the 1989-90 and 1994-95 crop years, 
total California raisin shipments increased by three percent, which 
benefitted both small and large handlers.
    Accordingly, the Agricultural Marketing Service has determined that 
the issuance of this final rule will not have a significant economic 
impact on a substantial number of small entities in the California 
raisin industry.
    After consideration of all relevant information presented, 
including the Committee's recommendations and other information, it is 
found that finalizing the interim final rule, without change, as 
published in the Federal Register on February 26, 1996 (61 FR 7067), 
will tend to effectuate the declared policy of the Act.

List of Subjects in 7 CFR Part 989

    Grapes, Marketing agreements, Raisins, Reporting and recordkeeping 
requirements.

PART 989--RAISINS PRODUCED FROM GRAPES GROWN IN CALIFORNIA

    Accordingly, the interim final rule amending 7 CFR part 989 which 
was published at 61 FR 7067 on February 26, 1996, is adopted as a final 
rule without change.

    Dated: July 8, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-17869 Filed 7-12-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-17867 Irish Potatoes Grown in Colorado; Assessment Rate
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36813-36814]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17867]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Agricultural Marketing Service

7 CFR Part 948

[Docket No. FV96-948-2IFR]

Irish Potatoes Grown in Colorado; Assessment Rate

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Interim final rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: This interim final rule establishes an assessment rate for the 
Colorado Potato Administrative Committee, San Luis Valley Office (Area 
II) (Committee) under Marketing Order No. 948 for the 1996-97 and 
subsequent fiscal periods. The Committee is responsible for local 
administration of the marketing order which regulates the handling of 
Irish potatoes grown in Colorado. Authorization to assess potato 
handlers enables the Committee to incur expenses that are reasonable 
and necessary to administer the program.

DATES: Effective on September 1, 1996. Comments received by August 14, 
1996, will be considered prior to issuance of a final rule.

ADDRESSES: Interested persons are invited to submit written comments 
concerning this rule. Comments must be sent in triplicate to the Docket 
Clerk, Fruit and Vegetable Division, AMS, USDA, P.O. Box 96456, room 
2523-S, Washington, DC 20090-6456, FAX 202-720-5698. Comments should 
reference the docket number and the date and page number of this issue 
of the Federal Register and will be available for public inspection in 
the Office of the Docket Clerk during regular business hours.

FOR FURTHER INFORMATION CONTACT: Martha Sue Clark, Program Assistant, 
Marketing Order Administration Branch, Fruit and Vegetable Division, 
AMS, USDA, P.O. Box 96456, room 2523-S, Washington, DC 20090-6456, 
telephone 202-720-9918, FAX 202-720-5698, or Dennis L. West, Marketing 
Specialist, Northwest Marketing Field Office, Fruit and Vegetable 
Division, AMS, USDA, Green-Wyatt Federal Building, room 369, 1220 
Southwest Third Avenue, Portland, OR 97204, telephone 503-326-2724, FAX 
503-326-7440.

SUPPLEMENTARY INFORMATION: This rule is issued under Marketing 
Agreement No. 97 and Order No. 948, both as amended (7 CFR part 948), 
regulating the handling of Irish potatoes grown in Colorado, 
hereinafter referred to as the ``order.'' The order is effective under 
the Agricultural Marketing Agreement Act of 1937, as amended (7 U.S.C. 
601-674), hereinafter referred to as the ``Act.''
    The Department of Agriculture (Department) is issuing this rule in 
conformance with Executive Order 12866.
    This rule has been reviewed under Executive order 12778, Civil 
Justice Reform. Under the marketing order now in effect, Colorado 
potato handlers are subject to assessments. Funds to administer the 
order are derived from such assessments. It is intended that the 
assessment rate as issued herein will be applicable to all assessable 
potatoes beginning September 1, 1996, and continuing until amended, 
suspended, or terminated. This rule will not preempt any State or local 
laws, regulations, or policies, unless they present an irreconcilable 
conflict with this rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and request a modification of the order or to be exempted 
therefrom. Such handler is afforded the opportunity for a hearing on 
the petition. After the hearing the Secretary would rule on the 
petition. The Act provides that the district court of the United States 
in any district in which the handler is an inhabitant, or has his or 
her principal place of business, has jurisdiction to review the 
Secretary's ruling on the petition, provided an action is filed not 
later than 20 days after the date of the entry of the ruling.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this rule on small entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and the rules issued thereunder, are unique in 
that they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are approximately 285 producers of Colorado Area II potatoes 
in the production area and approximately 118 handlers subject to 
regulation under the marketing order. Small agricultural producers have 
been defined by the Small Business Administration (13 CFR 121.601) as 
those having annual receipts of less than $500,000, and small 
agricultural service firms are defined as those whose annual receipts 
are less than $5,000,000. The majority of Colorado Area II potato 
producers and handlers may be classified as small entities.
    The Colorado potato marketing order provides authority for the 
Committee, with the approval of the Department, to formulate an annual 
budget of expenses and collect assessments from handlers to administer 
the program. The members of the Committee are producers and handlers of 
Colorado Area II potatoes. They are familiar with the Committee's needs 
and with the costs for goods and services in their local area and are 
thus in a position to formulate an appropriate budget and assessment 
rate. The assessment rate is

[[Page 36814]]

formulated and discussed in a public meeting. Thus, all directly 
affected persons have an opportunity to participate and provide input.
    In Colorado, both a State and a Federal marketing order operate 
simultaneously. The State order authorizes promotion, including paid 
advertising, which the Federal order does not. All expenses in this 
category are financed under the State order. The jointly operated 
programs consume about equal administrative time and the two orders 
continue to split administrative costs equally.
    The Committee met on May 23, 1996, and unanimously recommended 
1996-97 expenditures of $60,999 and an assessment rate of $0.0030 per 
hundredweight of potatoes. In comparison, last year's budgeted 
expenditures were $62,328. The assessment rate of $0.0030 is the same 
as last year's established rate. Major expenditures recommended by the 
Committee for the 1996-97 year include $34,624 for salaries for the 
Executive Director, Administrator, and Assistant Administrator, and 
$3,000 for utilities. Budgeted expenses for these items in 1995-96 were 
$36,978 and $3,000, respectively.
    The assessment rate recommended by the Committee was derived by 
dividing anticipated expenses by expected shipments of Colorado Area II 
potatoes. Potato shipments for the year are estimated at 16,500,000 
hundredweight which should provide $49,500 in assessment income. Income 
derived from handler assessments, along with funds from the Committee's 
authorized reserve, will be adequate to cover budgeted expenses. Funds 
in the reserve will be kept within the maximum permitted by the order.
    While this rule will impose some additional costs on handlers, the 
costs are in the form of uniform assessments on all handlers. Some of 
the additional costs may be passed on to producers. However, these 
costs will be offset by the benefits derived by the operation of the 
marketing order. Therefore, the AMS has determined that this rule will 
not have a significant economic impact on a substantial number of small 
entities. Interested persons are invited to submit information on the 
regulatory and informational impacts of this action on small 
businesses.
    The assessment rate established in this rule will continue in 
effect indefinitely unless modified, suspended, or terminated by the 
Secretary upon recommendation and information submitted by the 
Committee or other available information.
    Although this assessment rate is effective for an indefinite 
period, the Committee will continue to meet prior to or during each 
fiscal period to recommend a budget of expenses and consider 
recommendations for modification of the assessment rate. The dates and 
times of Committee meetings are available from the Committee or the 
Department. Committee meetings are open to the public and interested 
persons may express their views at those meetings. The Department will 
evaluate Committee recommendations and other available information to 
determine whether modification of the assessment rate is needed. 
Further rulemaking will be undertaken as necessary. The Committee's 
1996-97 budget and those for subsequent fiscal periods will be reviewed 
and, as appropriate, approved by the Department.
    After consideration of all relevant material presented, including 
the information and recommendation submitted by the Committee and other 
available information, it is hereby found that this rule, as 
hereinafter set forth, will tend to effectuate the declared policy of 
the Act.
    Pursuant to 5 U.S.C. 553, it is also found and determined upon good 
cause that it is impracticable, unnecessary, and contrary to the public 
interest to give preliminary notice prior to putting this rule into 
effect, because: (1) The Committee needs to have sufficient funds to 
pay its expenses which are incurred on a continuous basis; (2) the 
1996-97 fiscal period begins on September 1, 1996, and the marketing 
order requires that the rate of assessment for each fiscal period apply 
to all assessable potatoes handled during such fiscal period; (3) 
handlers are aware of this action which was unanimously recommended by 
the Committee at a public meeting and is similar to other assessment 
rate actions issued in past years; and (4) this interim final rule 
provides a 30-day comment period, and all comments timely received will 
be considered prior to finalization of this rule.

List of Subjects in 7 CFR Part 948

    Marketing agreements, Potatoes, Reporting and recordkeeping 
requirements.

    For the reasons set forth in the preamble, 7 CFR part 948 is 
amended as follows:

PART 948--IRISH POTATOES GROWN IN COLORADO

    1. The authority citation for 7 CFR part 948 continues to read as 
follows:

    Authority: 7 U.S.C. 601-674.

    2. A new Sec. 948.216 is added to read as follows:

    Note: This section will appear in the Code of Federal 
Regulations.

Sec. 948.216  Assessment rate.

    On and after September 1, 1996, an assessment rate of $0.0030 per 
hundredweight is established for Colorado Area II potatoes.

    Dated: July 8, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-17867 Filed 7-12-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-17794 Minnesota State Plan; Level of Federal Enforcement
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36824-36825]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17794]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Occupational Safety and Health Administration

29 CFR Part 1952

Minnesota State Plan; Level of Federal Enforcement

AGENCY: Occupational Safety and Health Administration, Labor.

ACTION: Final rule; change in level of Federal enforcement.

-----------------------------------------------------------------------

SUMMARY: This document gives notice of a change in the level of federal 
enforcement authority in Minnesota. The Minnesota Department of Labor 
and Industry is excluding coverage of tribal and private sector 
employment on Indian Reservations under its approved State plan. As a 
result, the U.S. Department of Labor, Occupational Safety and Health 
Administration (OSHA) is assuming coverage over tribal and private 
sector employment on Indian reservations. OSHA is hereby amending 
sections of its regulations to reflect this change in the level of 
enforcement authority.

EFFECTIVE DATE: July 15, 1996.

FOR FURTHER INFORMATION CONTACT: Anne Cyr, Acting Director, Office of 
Information and Consumer Affairs, Occupational Safety and Health 
Administration, U.S. Department of Labor, Room, N-3637, 200 
Constitution Avenue, NW., Washington, DC 20210, (202) 219-8148.

SUPPLEMENTARY INFORMATION:

A. Background

    Section 18 of the Occupational Safety and Health Act of 1970, 29 
U.S.C. 667, provides that States which wish to assume responsibility 
for developing and enforcing their own occupational safety and health 
standards, may do so by submitting, and obtaining Federal approval of, 
a State plan. State plan approval occurs in stages which include 
initial approval under section 18(b) of the Act and, ultimately, final 
approval under section 18(e).
    The Minnesota State plan was initially approved on May 29, 1973. On 
July 30, 1985, OSHA announced the final approval of the Minnesota State 
plan pursuant to section 18(e) and amended Subpart N of 29 CFR Part 
1952 to reflect the Assistant Secretary's decision. As a result, 
Federal OSHA relinquished its authority with regard to occupational 
safety and health issues covered by the Minnesota plan. Federal OSHA 
retained its authority over safety and health in private sector 
offshore maritime employment, employment at the Twin Cities Army 
Ammunition Plant, and with regard to Federal government employers and 
employees.
    29 CFR 1952.205 states that ``any hazard, industry, geographical 
area, operation or facility over which the State is unable to 
effectively exercise jurisdiction for reasons not related to the 
required performance or structure of the plan shall be deemed to be an 
issue not covered by the plan which has received final approval and 
shall be subject to Federal enforcement. Where enforcement jurisdiction 
is shared between Federal and State authorities for a particular area, 
project, or facility, in the interest or [sic] administrative 
practicability Federal jurisdiction may be assumed over the entire 
project or facility. In either of the two aforementioned circumstances, 
Federal enforcement may be exercised immediately upon agreement between 
Federal OSHA and the State designated agency.''
    On December 21, 1994 Darrell E. Anderson, Director, Minnesota OSHA 
Management Team, Minnesota Department of Labor and Industry, wrote that 
because of the many ``obstacles Minnesota OSHA faces in gaining access 
to Indian reservation worksites and tribal employers, and because 
Federal OSHA is not subject to the same limitations as the State . . 
.'' Minnesota will ``exclude Indian reservations from coverage under 
the Minnesota Occupational Safety and Health Act'' (December 21, 1994 
letter to Area Director Charles E. Burin).

B. Decision

    To assure worker protection under the OSH Act, Federal OSHA will 
assume coverage over tribal and private sector employment on Indian 
reservations. OSHA is hereby amending 29 CFR part 1952, Subpart N, to 
reflect this change in the level of Federal enforcement.

List of Subjects in 29 CFR Part 1952

    Intergovernmental relations, Law enforcement, Occupational safety 
and health, Reporting and recordkeeping requirements.

    Signed at Washington, DC, this 28th day of June 1996.
Joseph A. Dear,
Assistant Secretary.

    For the reasons set out in the preamble 29 CFR part 1952 is amended 
as set forth below:

PART 1952--APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS

    1. The authority citation for part 1952 continues to read as 
follows:

    Authority: Secs. 18, 84, Stat. 1608 (29 U.S.C. 667); 29 CFR part 
1902, Secretary of Labor's Order No. 1-90 (55 FR 9033).

    2. Section 1952.204 is amended by revising paragraph (b) to read as 
follows:

Sec. 1952.204  Final approval determination.

* * * * *
    (b) The plan which has received final approval covers all 
activities of employers and all places of employment in Minnesota 
except for private sector offshore maritime employment, employment at 
the Twin Cities Army Ammunition Plant, Federal government employers and 
employees, and any tribal or private sector employment

[[Page 36825]]

within any Indian reservation in the State.
* * * * *
    3. Section 1952.205 is amended by revising the first four sentences 
of paragraph (b) to read as follows:

Sec. 1952.205  Level of Federal enforcement.

* * * * *
    (b) In accordance with section 18(e), final approval relinquishes 
Federal OSHA authority only with regard to occupational safety and 
health issues covered by the Minnesota plan. OSHA retains full 
authority over issues which are not subject to State enforcement under 
the plan. Thus, Federal OSHA retains its authority relative to safety 
and health in private sector offshore maritime activities and will 
continue to enforce offshore all provisions of the Act, rules or 
orders, and all Federal standards, current or future, specifically 
directed to maritime employment (29 CFR Part 1915, shipyard employment; 
Part 1917, marine terminals; Part 1918, longshoring; Part 1919, gear 
certification) as well as provisions of general industry standards (29 
CFR Part 1910) appropriate to hazards found in these employments. 
Federal jurisdiction is also retained over the Twin Cities Army 
Ammunitions Plant, over Federal government employers and employees, and 
over any tribal or private sector employment within any Indian 
reservation in the State. * * *
* * * * *
    4. Section 1952.205 is further amended by removing the word ``or'' 
immediately preceding the words ``administrative practicability'' in 
the second to last sentence in paragraph (b) and adding the word ``of'' 
in its place.

[FR Doc. 96-17794 Filed 7-12-96; 8:45 am]
BILLING CODE 4510-26-P

Complete official Federal Register PDF

FR Doc. 96-17792 Allocation of Assets in Single-Employer Plans; Interest Rate for Valuing Benefits
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36968-36969]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17792]

[[Page 36967]]

_______________________________________________________________________

Part II

Pension Benefit Guaranty Corporation

_______________________________________________________________________

29 CFR Part 4044

Allocation of Assets in Single-Employer Plans; Interest Rates and 
Assumptions Used in Making Benefits Valuations; Final Rule and Notice

Federal Register / Vol. 61, No. 136 / Monday, July 15, 1996 / Rules 
and Regulations

[[Page 36968]]

PENSION BENEFIT GUARANTY CORPORATION

29 CFR Part 4044

Allocation of Assets in Single-Employer Plans; Interest Rate for 
Valuing Benefits

AGENCY: Pension Benefit Guaranty Corporation.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule amends the Pension Benefit Guaranty 
Corporation's regulation on Allocation of Assets in Single-Employer 
Plans. The regulation prescribes interest assumptions for valuing 
benefits under terminating single-employer plans. This rule adopts 
interest assumptions for plans with valuation dates in August 1996 and 
advises the public of the new assumptions. These interest assumptions 
are also used under the PBGC's regulation on Duties of Plan Sponsor 
Following Mass Withdrawal.

EFFECTIVE DATE: August 1, 1996.

FOR FURTHER INFORMATION CONTACT: Harold J. Ashner, Assistant General 
Counsel, Office of the General Counsel, Pension Benefit Guaranty 
Corporation, 1200 K Street, NW., Washington, DC 20005, 202-326-4024 
(202-326-4179 for TTY and TDD).

SUPPLEMENTARY INFORMATION: This rule adopts the August 1996 interest 
assumptions to be used in benefit valuations for terminating single-
employer plans. Before July 1996, the interest assumptions used for 
such benefit valuations were contained in PBGC regulations codified at 
29 CFR part 2619. In a final rule effective July 1, 1996 (61 FR 34001), 
the PBGC reorganized and renumbered its regulations. The single-
employer benefit valuation provisions are now codified in the PBGC's 
regulation on Allocation of Assets in Single-Employer Plans at 29 CFR 
part 4044, and this rule amends that regulation. As discussed in a 
notice published elsewhere in today's Federal Register, these interest 
assumptions are also used in valuations of multiemployer plans 
following mass withdrawal.
    Part 4044 prescribes actuarial assumptions for valuing plan 
benefits of terminating single-employer plans covered by title IV of 
the Employee Retirement Income Security Act of 1974. Under ERISA 
section 4041(c), a single-employer plan administrator wishing to 
terminate the plan in a distress termination must value guaranteed 
benefits and ``benefit liabilities'' (i.e., all benefits provided under 
the plan as of the plan termination date) in accordance with part 4044. 
(Benefit liabilities may also be valued in accordance with part 4044 
for purposes of the Standard Termination Notice filed with the PBGC by 
a plan terminating in a standard termination, although this is not 
required.) In addition, when the PBGC terminates an underfunded plan 
involuntarily pursuant to ERISA section 4042(a), it values benefits in 
accordance with part 4044 to determine the amount of the plan's 
underfunding.
    Among the actuarial assumptions prescribed in part 4044 are 
interest rates and factors, which are set forth in appendix B to part 
4044. Because these interest rates and factors are intended to reflect 
current conditions in the financial and annuity markets, it is 
necessary to update the rates and factors periodically.
    Two sets of interest rates and factors are prescribed, one set for 
the valuation of benefits to be paid as annuities and one set for the 
valuation of benefits to be paid as lump sums. This amendment adds to 
appendix B to part 4044 the two sets of interest rates and factors for 
valuing benefits in plans with valuation dates during August 1996.
    For annuity benefits, the interest rates will be 6.30 percent for 
the first 20 years following the valuation date and 4.75 percent 
thereafter. For benefits to be paid as lump sums, the interest 
assumptions to be used by the PBGC will be 5.25 percent for the period 
during which benefits are in pay status, 4.50 percent during the seven-
year period directly preceding the benefit's placement in pay status, 
and 4.00 percent during any other years preceding the benefit's 
placement in pay status. The annuity interest assumptions represent an 
increase (from those in effect for July 1996) of 0.10 percent for the 
first 20 years following the valuation date and are otherwise 
unchanged. The lump sum interest assumptions represent an increase 
(from those in effect for July 1996) of 0.25 percent for the period 
during which benefits are in pay status and the seven years directly 
preceding that period and are otherwise unchanged.
    Generally, the interest rates and factors under part 4044 are in 
effect for at least one month. However, the PBGC publishes its interest 
assumptions each month regardless of whether they represent a change 
from the previous month's assumptions. The assumptions are normally 
published in the Federal Register on or about the 15th of the preceding 
month.
    The PBGC has determined that notice and public comment on this 
amendment are impracticable and contrary to the public interest. This 
finding is based on the need to determine and issue new interest rates 
and factors promptly so that the rates and factors can reflect, as 
accurately as possible, current market conditions.
    Because of the need to provide immediate guidance for the valuation 
of benefits in plans with valuation dates during August 1996, the PBGC 
finds that good cause exists for making the rates and factors set forth 
in this amendment effective less than 30 days after publication.
    The PBGC has determined that this action is not a ``significant 
regulatory action'' under the criteria set forth in Executive Order 
12866.
    Because no general notice of proposed rulemaking is required for 
this amendment, the Regulatory Flexibility Act of 1980 does not apply. 
See 5 U.S.C. 601(2).

List of Subjects in 29 CFR Part 4044

    Pension insurance, Pensions.

    In consideration of the foregoing, part 4044 of chapter XL, title 
29, Code of Federal Regulations, is hereby amended as follows:

PART 4044--[AMENDED]

    1. The authority citation for part 4044 continues to read as 
follows:

    Authority: 29 U.S.C. 1301(a), 1302(b)(3), 1341, 1344, 1362.

Appendix B to Part 4044--[Amended]

    2. In appendix B, a new entry is added to Table I, and Rate Set 34 
is added to Table II, as set forth below. The introductory text of each 
table is republished for the convenience of the reader and remains 
unchanged.

Appendix B to Part 4044--Interest Rates Used to Value Annuities and 
Lump Sums

[[Page 36969]]

                                          Table I.--Annuity Valuations                                          
  [This table sets forth, for each indicated calendar month, the interest rates (denoted by i1, i2, * * *, and  
  referred to generally as it) assumed to be in effect between specified anniversaries of a valuation date that 
 occurs within that calendar month; those anniversaries are specified in the columns adjacent to the rates. The 
               last listed rate is assumed to be in effect after the last listed anniversary date]              
----------------------------------------------------------------------------------------------------------------
                                                                The values of it are:                           
 For valuation dates occurring in  -----------------------------------------------------------------------------
            the month--                  it         for t=         it         for t=         it         for t=  
----------------------------------------------------------------------------------------------------------------
                                                                                                                
*                  *                  *                  *                  *                  *                
August 1996.......................        .0630         1-20        .0475          >20          N/A          N/A
----------------------------------------------------------------------------------------------------------------

                                                             Table II.--Lump Sum Valuations                                                             
  [In using this table: (1) For benefits for which the participant or beneficiary is entitled to be in pay status on the valuation date, the immediate  
 annuity rate shall apply; (2) For benefits for which the deferral period is y years (where y is an integer and 0 < y  n1), interest rate i1 
   shall apply from the valuation date for a period of y years, and thereafter the immediate annuity rate shall apply; (3) For benefits for which the   
 deferral period is y years (where y is an integer and n1 < y  n1 + n2), interest rate i2 shall apply from the valuation date for a period of
y - n1 years, interest rate i1 shall apply for the following n1 years, and thereafter the immediate annuity rate shall apply; (4) For benefits for which
the deferral period is y years (where y is an integer and y > n1 + n2), interest rate i3 shall apply from the valuation date for a period of y - n1 - n2
  years, interest rate i2 shall apply for the following n2 years, interest rate i1 shall apply for the following n1 years, and thereafter the immediate 
                                                                annuity rate shall apply]                                                               
--------------------------------------------------------------------------------------------------------------------------------------------------------
                   For plans with a valuation date     Immediate                                 Deferred annuities (percent)                           
    Rate set     ----------------------------------   annuity rate  ------------------------------------------------------------------------------------
                    On or after         Before         (percent)            i1               i2               i3               n1               n2      
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                   *                  *                  *                  *                  *                  *                  *                  
34..............        08-1-96          09-1-96             5.25             4.50             4.00             4.00                7                8  
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Issued in Washington, DC, on this 5th day of July 1996.
Martin Slate,
Executive Director, Pension Benefit Guaranty Corporation.
[FR Doc. 96-17792 Filed 7-12-96; 8:45 am]
BILLING CODE 7708-01-P

Complete official Federal Register PDF

FR Doc. 96-17746 Elimination of Requirement for Proof of Service in Consented Requests for Extensions of Time To File a Notice of Opposition
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Page 36825]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17746]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

Patent and Trademark Office

37 CFR Part 2

[Docket No. 960621181-6181-01]
RIN 0651-AA89

Elimination of Requirement for Proof of Service in Consented 
Requests for Extensions of Time To File a Notice of Opposition

AGENCY: Patent and Trademark Office, Commerce.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule deletes the requirement for proof of service when a 
request for an extension of time to oppose registration of a trademark 
is based upon a statement that applicant has consented to the request. 
This rule will simplify opposition proceedings by eliminating an 
unnecessary requirement.

EFFECTIVE DATE: July 15, 1996. This rule will be applicable to all 
relevant correspondence filed with the Office on or after the effective 
date.

FOR FURTHER INFORMATION CONTACT: David Sams by telephone at (703) 308-
9330, by facsimile transmission at (703) 308-9333, or by mail marked to 
his attention and addressed to the Assistant Commissioner for 
Trademarks, Box TTAB, 2900 Crystal Drive, Arlington, Virginia 22202-
3513.

SUPPLEMENTARY INFORMATION: Section 2.102(c)(2), which provides for an 
extension of time for filing an opposition under 37 CFR Part 2, is 
revised to delete the requirement that proof of service be included in 
consented extension requests. This change permits potential opposers to 
request an extension of time to oppose aggregating more than 120 days 
from the date of publication based on a written statement that the 
applicant or its authorized representative has consented to the 
request. The Office believes that the requirement for proof of service 
is unnecessary when the applicant has assertedly consented to the 
filing of the extension request. The Trademark Trial and Appeal Board 
sends a copy of the request together with the Board's action thereon to 
the applicant, which may file a request for reconsideration of the 
Board's action if necessary.
    The Patent and Trademark Office has determined that this revision 
is procedural and remedial in nature, and this revision is therefore 
being published as a final rule. 5 U.S.C. 553(b)(3) (A) and (B). This 
rule is not a significant rule for the purposes of Executive Order 
12866. No notice of proposed rulemaking is required for this rule under 
5 U.S.C. 553 or any other law, so a regulatory flexibility analysis is 
not required and has not been prepared. 5 U.S.C. 603(a).

List of Subjects in 37 CFR Part 2

    Administrative practice and procedure, Conflicts of interest, 
Courts, Inventions and patents, Lawyers.

    For the reasons set forth in the preamble, and pursuant to the 
authority contained in 15 U.S.C. 1123 and 35 U.S.C. 6, part 2 of title 
37 of the Code of Federal Regulations is amended as set forth below:

PART 2--RULES OF PRACTICE IN TRADEMARK CASES

    1. The authority citation for 37 CFR Part 2 continues to read as 
follows:

    Authority: 15 U.S.C. 1123; 35 U.S.C. 6, unless otherwise noted.

    2. Section 2.102(c)(2) is revised to read as follows:

Sec. 2.102  Extension of time for filing an opposition.

* * * * *
    (c) * * * (2) a written request by the potential opposer or its 
authorized representative stating that the applicant or its authorized 
representative has consented to the request, or * * *

    Dated: July 2, 1996.
Bruce A. Lehman,
Assistant Secretary of Commerce and Commissioner of Patents and 
Trademarks.
[FR Doc. 96-17746 Filed 7-12-96; 8:45 am]
BILLING CODE 3510-16-P

Complete official Federal Register PDF

FR Doc. 96-17711 Service of Process; Production of Official Information; and Testimony of Agency Employees
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36820-36824]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17711]

=======================================================================
-----------------------------------------------------------------------

ARMS CONTROL AND DISARMAMENT AGENCY

22 CFR Part 608

Service of Process; Production of Official Information; and 
Testimony of Agency Employees

AGENCY: Arms Control and Disarmament Agency.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule establishes or clarifies policies, practices, 
responsibilities, and procedures for the service of legal process upon 
the United States Arms Control and Disarmament Agency (ACDA, the 
Agency), its officers, and employees, and the production of official 
ACDA information and the appearance of and testimony by ACDA employees 
as witnesses in connection with litigation. This rule is procedural in 
nature.

EFFECTIVE DATE: July 15, 1996.

FOR FURTHER INFORMATION CONTACT: Frederick Smith, Jr., United States 
Arms Control and Disarmament Agency, Room 5635, 320 21st Street, NW., 
Washington, DC 20451, telephone (202) 647-3596.

SUPPLEMENTARY INFORMATION:

General

    This rule is intended to clarify ACDA policies and practices 
regarding litigation-related matters such as service of process upon 
ACDA and ACDA

[[Page 36821]]

employees and the production of official ACDA information in 
litigation. ACDA anticipates that the rule will eliminate or reduce 
current ambiguities regarding such matters for ACDA employees, as well 
as for private attorneys and judicial and quasi-judicial authorities. 
ACDA also expects that this rule will promote consistency in ACDA's 
assertions of privileges and objections, thereby reducing the potential 
for both inappropriate, potentially harmful disclosure of protected 
information and wasteful or inappropriate allocation of Agency 
resources. Although the rule is largely self-explanatory, we describe 
the general scheme of the several subsections below for the readers' 
ease of reference.

Service of Process

    Part 604.4(b) of 22 CFR establishes the Agency's Office of the 
General Counsel as the designated office for the presentation of 
administrative claims asserted under the Federal Tort Claims Act (and 
22 CFR parts 602, 603, and 605 set forth procedures for administrative 
requests under the Freedom of Information Act, under the Privacy Act, 
and for declassification of national security information, 
respectively). However, until the present, the Agency has not had 
regulations establishing the Agency's General Counsel, or his/her 
delegate, as the sole Agency recipient for litigation-related demands, 
whether civil or criminal, for official Agency information, whether 
oral or documentary, or for other Agency action. The rule also 
clarifies that ACDA is not an agent for service on behalf of its 
employees in respect of purely private legal disputes and explains that 
ACDA will counsel its employees not to use their official positions to 
evade judicial process.

Compliance With Requests or Demands for Official Information

    Fundamentally, the compliance sections of the rule (Secs. 608.4-
608.9) simply track, to a greater or lesser degree, similar regulations 
which have been adopted by other federal agencies and which derive from 
the Supreme Court's decision in United States ex rel. Touhy v. Ragen, 
340 U.S. 462 (1951). Thus, the principal thrust of the compliance 
provisions of the rule is that Agency employees (including former 
employees) must obtain the approval of the Agency's General Counsel, or 
his/her delegate, prior to responding to any subpoenas or other 
litigation-related requests or demands for Agency information, whether 
classified or unclassified, that relate to the employee's official 
duties.
    Significantly, Sec. 608.5 requires the party who initiates a 
litigation-related request or demand for official ACDA information to 
provide a written statement providing specified information concerning 
the nature and scope of the demand.
    Finally, the rule describes factors, among others, that Agency 
officials shall take into consideration when considering litigation-
related requests or demands and specifies that Agency employees may 
ordinarily not provide expert or official testimony on behalf of 
private parties.
    On May 28, 1996, ACDA published a notice of proposed rulemaking (61 
FR 26474-26477) with a 31-day comment period. No comments were received 
during the comment period. Accordingly, the rule is adopted as 
proposed.

List of Subjects in 22 CFR Part 608

    Administrative practice and procedure, Classified information, 
Government employees.

    Chapter VI of title 22 of the Code of Federal Regulations is 
amended by adding a new part 608 to read as follows:

PART 608--SERVICE OF PROCESS; PRODUCTION OR DISCLOSURE OF OFFICIAL 
INFORMATION IN RESPONSE TO COURT ORDERS, SUBPOENAS, NOTICES OF 
DEPOSITIONS, REQUESTS FOR ADMISSIONS, INTERROGATORIES, OR SIMILAR 
REQUESTS OR DEMANDS IN CONNECTION WITH FEDERAL OR STATE LITIGATION; 
EXPERT TESTIMONY

Sec.
608.1  Purpose and scope; definitions.
608.2  Service of summonses and complaints.
608.3  Service of subpoenas, court orders, and other demands or 
requests for official information or action.
608.4  Testimony and production of documents prohibited unless 
approved by appropriate Agency officials.
608.5  Procedure when testimony or production of documents is 
sought--general.
608.6  Procedure when response to demand is required prior to 
receiving instructions.
608.7  Procedure in the event of an adverse ruling.
608.8  Considerations in determining whether the Agency will comply 
with a demand or request.
608.9  Prohibition on providing expert or opinion testimony.

    Authority: 22 U.S.C. 2581(j).

Sec. 608.1   Purpose and scope; definitions.

    (a) This part sets forth the procedures to be followed with respect 
to:
    (1) service of summonses and complaints or other requests or 
demands directed to the U.S. Arms Control and Disarmament Agency (ACDA, 
the Agency) or to any ACDA employee or former employee in connection 
with federal or state litigation arising out of or involving the 
performance of official activities of ACDA; and
    (2) the oral or written disclosure, in response to subpoenas, 
orders, or other requests or demands of federal or state judicial or 
quasi-judicial authority (collectively, ``demands''), whether civil or 
criminal in nature, or in response to requests for depositions, 
affidavits, admissions, responses to interrogatories, document 
production, or other litigation-related matters, pursuant to the 
Federal Rules of Civil Procedure, the Federal Rules of Criminal 
Procedure, or applicable state rules (collectively, ``requests''), of 
any material contained in the files of the Agency, any information 
relating to material contained in the files of the Agency, or any 
information acquired while the subject of the demand or request is or 
was an employee of the Agency as part of the performance of the 
person's duties or by virtue of the person's official status.
    (b) For purposes of this part, and except as ACDA may otherwise 
determine in a particular case, the term employee includes the Director 
of ACDA and former Directors of ACDA, and all employees and former 
employees of ACDA or other federal agencies who are or were appointed 
by, or subject to the supervision, jurisdiction, or control of the 
Director of ACDA, whether residing or working in the United States or 
abroad, including United States nationals, foreign nationals, and 
contractors.
    (c) For purposes of this part, the term litigation encompasses all 
pre-trial, trial, and post-trial stages of all judicial or 
administrative actions, hearings, investigations, or similar 
proceedings before courts, commissions, boards, or other judicial or 
quasi-judicial bodies or tribunals, whether criminal, civil, or 
administrative in nature. This part governs, inter alia, responses to 
discovery requests, depositions, and other pre-trial, trial, or post-
trial proceedings, as well as responses to informal requests by 
attorneys or others in situations involving litigation. However, this 
part shall not apply to any claims by ACDA employees (present or 
former), or applicants for Agency employment, for which

[[Page 36822]]

jurisdiction resides with the U.S. Equal Employment Opportunity 
Commission; the U.S. Merit Systems Protection Board; the Office of 
Special Counsel; the Federal Labor Relations Authority; the Foreign 
Service Labor Relations Board; the Foreign Service Grievance Board; or 
a labor arbitrator operating under a collective bargaining agreement 
between ACDA and a labor organization representing ACDA employees; or 
their successor agencies or entities.
    (d) For purposes of this part, official information means all 
information of any kind, however stored, that is in the custody and 
control of ACDA, relates to information in the custody and control of 
ACDA, or was acquired by ACDA employees as part of their official 
duties or because of their official status within ACDA while such 
individuals are employed by or served on behalf of ACDA.
    (e) Nothing in this part affects disclosure of information under 
the Freedom of Information Act (FOIA), 5 U.S.C. 552, the Privacy Act, 5 
U.S.C. 552a, Executive Order 12958, 3 CFR, 1995 Comp., p. 333, the 
Government in the Sunshine Act, 5 U.S.C. 552b, the Agency's regulations 
in 22 CFR chapter VI implementing any of the foregoing, or pursuant to 
congressional subpoena. Nothing in this part otherwise permits 
disclosure of information by ACDA or its employees except as provided 
by statute or other applicable law.
    (f) This part is intended only to inform the public about ACDA 
procedures concerning the service of process and responses to demands 
or requests and is not intended to and does not create, and may not be 
relied upon to create, any right or benefit substantive or procedural, 
enforceable at law by a party against ACDA or the United States.
    (g) Nothing in this part affects:
    (1) The disclosure of information during the course of legal 
proceedings in foreign courts, commissions, boards, or other judicial 
or quasi-judicial bodies or tribunals; or
    (2) The rules and procedures, under applicable U.S. law and 
international conventions, governing diplomatic and consular immunity.
    (h) Nothing in this part affects the disclosure of official 
information to other federal agencies or Department of Justice 
attorneys in connection with litigation conducted on behalf or in 
defense of the United States, its agencies, officers, and employees, or 
to federal, state, local, or foreign prosecuting and law enforcement 
authorities in conjunction with criminal law enforcement 
investigations, prosecutions, extradition, deportation or other 
proceedings.

Sec. 608.2  Service of summonses and complaints.

    (a) Only ACDA's General Counsel, or his/her delegate, is authorized 
to receive and accept summonses or complaints sought to be served upon 
ACDA or ACDA employees. All such documents should be delivered or 
addressed to General Counsel, U.S. Arms Control and Disarmament Agency, 
320 21st St. NW., Room 5635, Washington, DC 20451. Pursuant to 42 
U.S.C. 659(b) and 5 U.S.C. 5520a(c)(1), this same officer has been 
designated specifically to accept service of process for the 
enforcement of the legal obligation to provide child support or to make 
alimony payments by employees of the Agency and to accept service of 
process for the enforcement of the legal obligation to pay monies owed 
for other than child support or alimony by employees of the Agency, 
respectively.
    (b) In the event any summons or complaint described in 
Sec. 608.1(a) is delivered to an employee of ACDA other than in the 
manner specified in this part, such attempted service shall be 
ineffective, and the recipient thereof shall either decline to accept 
the proffered service or return such document under cover of a written 
communication which directs the person attempting to make service to 
the procedures set forth in this part.
    (c) Except as otherwise provided in Secs. 608.2(d) and 608.3(c), 
ACDA is not an authorized agent for service of process with respect to 
civil litigation against ACDA employees purely in their personal, non-
official capacity. Copies of summonses or complaints directed to ACDA 
employees in connection with legal proceedings arising out of the 
performance of official duties may, however, be served upon ACDA's 
General Counsel, or his/her delegate.
    (d) Although ACDA is not an agent for the service of process upon 
its employees with respect to purely personal, non-official litigation, 
ACDA recognizes that its employees stationed overseas should not use 
their official positions to evade their personal obligations and will, 
therefore, counsel and encourage ACDA employees to accept service of 
process in appropriate cases, and will waive applicable diplomatic or 
consular privileges and immunities when ACDA determines that it is in 
the interest of the United States to do so. Pursuant to section 302 of 
Executive Order 12953 (3 CFR, 1995 Comp., p. 325), ACDA's General 
Counsel has been designated in Appendix B to 5 CFR part 581 as the 
official to assist in the service of legal process in civil actions 
pursuant to orders of State courts to establish paternity and to 
establish or to enforce support obligations by making ACDA employees 
available for service of process, regardless of the location of the 
employee's workplace.
    (e) Documents for which ACDA's General Counsel, or his/her 
delegate, accepts service in official capacity only shall be stamped 
``Service Accepted in Official Capacity Only.'' Acceptance of service 
shall not constitute an admission or waiver with respect to 
jurisdiction, propriety of service, improper venue, or any other 
defense in law or equity available under the laws or rules applicable 
for the service of process.

Sec. 608.3  Service of subpoenas, court orders, and other demands or 
requests for official information or action.

    (a) Except in cases in which ACDA is represented by legal counsel 
who have entered an appearance or otherwise given notice of their 
representation, only ACDA's General Counsel, or his/her delegate, is 
authorized to receive and accept subpoenas, or other demands or 
requests directed to ACDA or any component thereof, or its employees, 
or former employees, whether civil or criminal in nature, for:
    (1) Material, including documents, contained in the files of the 
Agency;
    (2) Information, including testimony, affidavits, declarations, 
admissions, response to interrogatories, or informal statements, 
relating to material contained in the files of the Agency or which any 
Agency employee acquired in the course and scope of the performance of 
official duties;
    (3) Garnishment or attachment of compensation of current or former 
employees; or
    (4) The performance or non-performance of any official ACDA duty.
    (b) In the event that any subpoena, demand, or request is sought to 
be delivered to an Agency employee (including former employee) other 
than in the manner prescribed in paragraph (a) of this section, such 
attempted service shall be ineffective. Such employee shall, after 
consultation with the Office of the General Counsel, decline to accept 
the subpoena, demand, or request or shall return it to the server under 
cover of a written communication referring to the procedures prescribed 
in this part.
    (c) Except as otherwise provided in this part, ACDA is not an agent 
for service or otherwise authorized to accept on behalf of its 
employees any subpoenas, show-cause orders, or

[[Page 36823]]

similar compulsory process of federal or state courts, or requests from 
private individuals or attorneys, which are not related to the 
employees' official duties except upon the express, written 
authorization of the individual ACDA employee to whom such demand or 
request is directed.
    (d) Acceptance of such documents by ACDA's General Counsel, or his/
her delegate, does not constitute a waiver of any defenses that might 
otherwise exist with respect to service under the Federal Rules of 
Civil or Criminal Procedure or other applicable rules.

Sec. 608.4  Testimony and production of documents prohibited unless 
approved by appropriate Agency officials.

    (a) No employee of ACDA shall, in response to a demand or request 
in connection with any litigation, whether criminal or civil, provide 
oral or written testimony by deposition,declaration, affidavit, or 
otherwise concerning any information acquired while such person is or 
was an employee of ACDA as part of the performance of that person's 
official duties or by virtue of that person's official status, unless 
authorized to do so by ACDA's General Counsel, or his/her delegate.
    (b) No ACDA employee shall, in response to a demand or request in 
connection with any litigation, produce for use at such proceedings any 
document or any other material acquired as part of the performance of 
that employee's duties or by virtue of that employee's official status, 
unless authorized to do so by ACDA's General Counsel, or his/her 
delegate.

Sec. 608.5  Procedure when testimony or production of documents is 
sought--general.

    (a) If official ACDA information is sought, through testimony or 
otherwise, by a request or demand, the party seeking such release or 
testimony must (except as otherwise required by federal law or 
authorized by the Office of the General Counsel) set forth in writing 
and with as much specificity as possible, the nature and relevance of 
the official information sought. Where documents or other materials are 
sought, the party should identify the record or reasonably describe it 
in terms of date, format, subject matter, the office originating or 
receiving the record, and the names of all persons to whom the record 
is known to relate. Subject to Sec. 606.7, ACDA employees may produce, 
disclose, release, comment upon, or testify concerning only those 
matters that were specified in writing and properly approved by ACDA's 
General Counsel or his/her delegate. See United States ex rel. Touhy v. 
Ragen, 340 U.S. 462 (1951). The Office of the General Counsel may waive 
this requirement in appropriate circumstances.
    (b) To the extent it deems necessary or appropriate, ACDA may also 
require from the party seeking such testimony or documents a plan of 
all reasonably foreseeable demands, including but not limited to the 
names of all employees and former employees from whom discovery will be 
sought, areas of inquiry, expected duration of proceedings requiring 
oral testimony, and identification of potentially relevant documents.
    (c) ACDA's General Counsel, or his/her delegate, will notify the 
ACDA employee and such other persons as circumstances may warrant of 
the decision regarding compliance with the request or demand.
    (d) The Office of the General Counsel will consult with the 
Department of Justice regarding legal representation for ACDA employees 
in appropriate cases.

Sec. 608.6  Procedure when response to demand is required prior to 
receiving instructions.

    (a) If a response to a demand is required before ACDA's General 
Counsel, or his/her delegate, renders a decision, ACDA will request 
that either a Department of Justice attorney or an ACDA attorney 
designated for the purpose:
    (1) Appear with the employee upon whom the demand has been made;
    (2) Furnish the court or other authority with a copy of the 
regulations contained in this part;
    (3) Inform the court or other authority that the demand has been or 
is being, as the case may be, referred for the prompt consideration of 
ACDA's General Counsel, or his/her delegate; and
    (4) Respectfully request the court or authority to stay the demand 
pending receipt of the requested instructions.
    (b) In the event that an immediate demand for production or 
disclosure is made in circumstances that would preclude the proper 
designation or appearance of a Department of Justice or ACDA attorney 
on the employee's behalf, the employee shall respectfully request the 
demanding court or authority for a reasonable stay of proceedings for 
the purpose of obtaining instructions from ACDA.

Sec. 608.7  Procedure in the event of an adverse ruling.

    If the court or other judicial or quasi-judicial authority declines 
to stay the effect of the demand in response to a request made pursuant 
to Sec. 608.6, or if the court or other authority rules that the demand 
must be complied with irrespective of the Agency's instructions not to 
produce the material or disclose the information sought, the employee 
upon whom the demand has been made shall respectfully decline to comply 
with the demand, citing these regulations and United States ex rel. 
Touhy v. Ragen, 340 U.S. 463 (1951).

Sec. 608.8  Considerations in determining whether the Agency will 
comply with a demand or request.

    (a) In deciding whether to comply with a demand or request, ACDA 
officials and attorneys shall consider, among others:
    (1) Whether such compliance would be unduly burdensome or otherwise 
inappropriate under the applicable rules of discovery or the rules of 
procedure governing the case or matter in which the demand arose;
    (2) Whether compliance is appropriate under the relevant 
substantive law concerning privilege or disclosure of information;
    (3) The public interest;
    (4) The need to conserve the time of ACDA employees for the conduct 
of official business;
    (5) The need to avoid spending the time and money of the United 
States for private purposes;
    (6) The need to maintain impartiality between private litigants in 
cases where a substantial government interest is not implicated;
    (7) Whether compliance would have an adverse effect on performance 
by ACDA of its mission and duties; and
    (8) The need to avoid involving ACDA in controversial issues not 
related to its mission.
    (b) Among those demands and requests in response to which 
compliance will not ordinarily be authorized are those with respect to 
which, inter alia, any of the following factors exist:
    (1) Compliance would violate a statute or a rule of procedure;
    (2) Compliance would violate a specific regulation or executive 
order;
    (3) Compliance would reveal information properly classified in the 
interest of national security;
    (4) Compliance would reveal confidential commercial or financial 
information or trade secrets without the owner's consent;
    (5) Compliance would reveal the internal deliberative processes of 
the Executive Branch; or
    (6) Compliance would potentially impede or prejudice an on-going 
law enforcement investigation.

[[Page 36824]]

Sec. 608.9  Prohibition on providing expert or opinion testimony.

    (a) Except as provided in this section, and subject to 5 CFR 
2635.805, ACDA employees shall not provide opinion or expert testimony 
based upon information which they acquired in the scope and performance 
of their official ACDA duties, except on behalf of the United States or 
a party represented by the Department of Justice.
    (b) Upon a showing by the requester of exceptional need or unique 
circumstances and that the anticipated testimony will not be adverse to 
the interests of the United States, ACDA's General Counsel, or his/her 
delegate, may, consistent with 5 CFR 2635.805, in the exercise of 
discretion, grant special, written authorization for ACDA employees to 
appear and testify as expert witnesses at no expense to the United 
States.
    (c) If, despite the final determination of ACDA's General Counsel, 
a court of competent jurisdiction or other appropriate authority orders 
the appearance and expert or opinion testimony of an ACDA employee, 
such employee shall immediately inform the office of the General 
Counsel of such order. If the Office of the General Counsel determines 
that no further legal review of or challenge to the court's order will 
be made, the ACDA employee shall comply with the order. If so directed 
by the Office of the General Counsel, however, the employee shall 
respectfully decline to testify. See United States ex rel. Touhy v. 
Ragen, 340 U.S. 462 (1951).

    Dated: July 1, 1996.
Mary Elizabeth Hoinkes,
General Counsel.
[FR Doc. 96-17711 Filed 7-14-96; 8:45 am]
BILLING CODE 6820-32-M

Complete official Federal Register PDF

FR Doc. 96-17593 Modification of Class E Airspace; Rice Lake, WI
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Page 36820]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17593]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-AGL-19]

Modification of Class E Airspace; Rice Lake, WI

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This action corrects an error in the summary portion of the 
Rice Lake Regional-Carl's Field Airport, Rice Lake, WI, docket 
published in the final rule on April 24, 1996 (61 FR 18061). Airspace 
Docket Number 95-AGL-19. There is no change to the legal description of 
the airspace.

EFFECTIVE DATE: 0901 UTC, August 15, 1996.

FOR FURTHER INFORMATION CONTACT: John A. Clayborn, Air Traffic 
Division, Operations Branch, AGL-530, Federal Aviation Administration, 
2300 East Devon Avenue, Des Plaines, Illinois 60018, telephone (847) 
294-7568.

SUPPLEMENTARY INFORMATION:

History

    Federal Register Document 96-9997, Airspace Docket 95-AGL-19, 
published on April 24, 1996, (61 FR 18061), established the Class E5 to 
accommodate a Very High Frequency Omnidirectional Range (VOR) for 
runway 19 approach and a Nondirectional Radio Beacon (NDB) for runway 
1/19 approach at Rice Lake Regional-Carl's Field Airport, Rice Lake, 
WI.
    Upon review of the final rule errors were discovered in the summary 
portion of the airspace action.
    The correct summary should read as follows: This action modifies 
Class E5 airspace to accommodate a VOR approach to runway 01, a VOR 
approach to runway 19 and an NDB approach to runway 19 at Rice Lake 
Regional-Carl's Field Airport, Rice Lake, WI.
 * * * * *
    Issued in Des Plaines, Illinois, June 25, 1996.
Maureen Woods,
Manager, Air Traffic Division.
[FR Doc. 96-17593 Filed 7-12-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-17580 Periodic Updates to the Pipeline Safety Regulations
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36825-36826]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17580]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Parts 192, 193, and 195

[Docket No. PS-143; Amdts. 192-76; 193-11; 195-56]
RIN 2137-AC74

Periodic Updates to the Pipeline Safety Regulations

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Corrections to the final rule.

-----------------------------------------------------------------------

SUMMARY: On May 24, 1996, RSPA published a final rule in the Federal 
Register (61 FR 26121) titled ``Periodic Updates to the Pipeline Safety 
Regulations.'' This final rule updated the references to voluntary 
specifications and standards to reflect more recently published 
editions of each document, enabling pipeline operators to utilize 
current technology, materials, and practices, thereby reducing costs 
and enhancing economic growth. The final rule also eliminated the 
requirement for odorization of hydrogen transmission lines in cases 
where the odorization interferes with industrial end uses. Consistent 
with President Clinton's Regulatory Reinvention Initiative, these 
actions eliminated unnecessary regulatory burdens without compromising 
safety. This document makes minor corrections to the final rule to 
provide consistency in the regulations.

EFFECTIVE DATE: August 14, 1996.

[[Page 36826]]

FOR FURTHER INFORMATION CONTACT: Eben M. Wyman, (202) 366-0918, 
regarding the subject matter of this document; or the Dockets Unit, 
(202) 366-4453; for copies of this document or other materials in the 
docket.

SUPPLEMENTARY INFORMATION:

Need for Correction

    The final rule did not make note of amendment numbers to properly 
revise the pipeline safety laws. The amendment numbers for Docket No. 
PS-143 are ``Amdt. 192-76; 193-11; 195-56.''
    In Section 192.63(a)(1) of the final rule, the word ``fitting'' is 
improperly used in discussing the marking of thermoplastic fittings in 
accordance with ASTM D 2513. The word ``fittings'' should replace the 
word ``fitting.''
    The final rule also updated two references to the address of the 
American Society for Testing and Materials (ASTM). However, the correct 
address was not updated in the amended Section 195.3(b)(6). The address 
was listed as ``Conshohocken, PA'' not ``West Conshohocken, PA,'' as 
correctly noted in the amended Appendix A of Part 192. To provide 
consistency in the pipeline safety regulations, this document corrects 
section 195.3(b)(6) to reflect the accurate address for ASTM. The 
correct address is ``American Society for Testing and Materials (ASTM), 
100 Barr Harbor Drive, West Conshohocken, PA 19428.''
    Finally, the updated editions of voluntary consensus standards 
included in Appendix A of Part 192 were not updated in Appendix B--
``Qualification of Pipe.'' Appendix B lists the pipe specifications 
incorporated by reference in Part 192. For consistency, the 
specifications in Appendix B should accurately reflect the updated 
references in Appendix A. This document updates the specifications in 
Appendix B to match Appendix A.

Correction of Publication

    Accordingly, the publication on May 24, 1996, of the final rule (61 
FR 26121) is corrected as follows:

Sec. 192.63--[Corrected]

    On page 26122, in the third column, in Sec. 192.63, paragraph 
(a)(1), in line four, the word ``fitting'' is corrected to read 
``fittings.''

Appendix B to Part 192--[Revised]

    On page 26123, in the third column, a new amendatory instruction is 
added following amendment 5.
    6. Appendix B to Part 192, section I, is revised to read as 
follows:

Appendix B to Part 192--Qualification of Pipe

I. Listed Pipe Specifications (Numbers in Parentheses Indicate 
Applicable Editions)

API 5L--Steel pipe (1995).
ASTM A 53--Steel pipe (1995a).
ASTM A 106--Steel pipe (1994a).
ASTM A 333/A 333M--Steel pipe (1994).
ASTM A 381--Steel pipe (1993).
ASTM A 671--Steel pipe (1994).
ASTM A 672--Steel pipe (1994).
ASTM A 691--Steel pipe (1993).
ASTM D 2513--Thermoplastic pipe and tubing (1995c).
ASTM D 2517--Thermosetting plastic pipe and tubing (1994).
* * * * *

Sec. 195.3--[Corrected]

    On page 26123, in the third column, in Sec. 195.3, paragraph 
(b)(6), in line three, the name ``Conshohocken'' is corrected to read 
``West Conshohocken.''
    These updates were incorporated in the final rule, so RSPA does not 
need further rulemaking action to correct the updated specifications in 
Appendix B of Part 192. The purpose of this Notice is to provide 
consistency in the pipeline safety regulations. RSPA regrets any 
confusion this error may have occasioned, and publishes this document 
to provide clarification to all affected parties of this rulemaking.

    Issued in Washington, DC, on July 3, 1996.
Richard B. Felder,
Associate Administrator for Pipeline Safety.
[FR Doc. 96-17580 Filed 7-12-96; 8:45 am]
BILLING CODE 4910-60-P

Complete official Federal Register PDF

FR Doc. 96-17483 Airworthiness Directives; Fairchild Aircraft SA226 and SA227 Series Airplanes
[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
[Rules and Regulations]
[Pages 36817-36820]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17483]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 93-CE-35-AD; Amendment 39-9689; AD 93-15-02 R2]
RIN 2120-AA64

Airworthiness Directives; Fairchild Aircraft SA226 and SA227 
Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: This amendment revises Airworthiness Directive (AD) 93-15-02 
R1, which requires the following on Fairchild Aircraft SA226 and SA227 
series airplanes that are equipped with a certain Simmonds-Precision 
pitch trim actuator: repetitively measuring the freeplay of the pitch 
trim actuator and repetitively inspecting the actuator for rod 
slippage; immediately replacing any actuator if certain freeplay 
limitations are exceeded or rod slippage is evident; and eventually 
replacing the actuator regardless of the inspection results. The 
compliance times for the first inspection of an actuator that is 
installed in accordance with AD 93-15-02 R1 was inadvertently 
referenced incorrectly. This action retains the repetitive inspection 
and replacement requirements of the current AD, corrects the above-
referenced compliance times, and adds an additional replacement 
actuator option that will then require repetitive inspections and 
replacements of that actuator. The actions specified by this AD are 
intended to prevent the horizontal stabilizer from going nose-down or 
jamming because of pitch trim actuator failure, which could result in 
loss of control of the airplane.

DATES: Effective July 25, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director

[[Page 36818]]

of the Federal Register as of July 25, 1996.
    Comments for inclusion in the Rules Docket must be received on or 
before August 30, 1996.

ADDRESSES: Service information that applies to this AD may be obtained 
from Field Support Engineering, Fairchild Aircraft, P.O. Box 790490, 
San Antonio, Texas 78279-0490; telephone (210) 824-9421; facsimile 
(210) 820-8609. This information may also be examined at the FAA, Room 
1558, 601 E. 12th Street, Kansas City, Missouri 64106.

FOR FURTHER INFORMATION CONTACT: Mr. Werner Koch, Aerospace Engineer, 
FAA, Airplane Certification Office, 2601 Meacham Boulevard, Fort Worth, 
Texas 76193-0150; telephone (817) 222-5133; facsimile (817) 222-5960.

SUPPLEMENTARY INFORMATION:

Events Leading to This Action

    On July 20, 1993, the FAA issued AD 93-15-02, Amendment 39-8648 (59 
FR 40734, July 30, 1993), to require the following on Fairchild 
Aircraft SA226 and SA227 series airplanes that are equipped with a 
Simmonds-Precision pitch trim actuator, part number (P/N) DL5040M5:

--repetitively measuring the freeplay of the pitch trim actuator and 
repetitively inspecting the actuator for rod slippage; and,
--if certain freeplay limitations are exceeded or rod slippage is 
evident, replacing any actuator with a new actuator of the same part 
number or with a part of improved design, P/N 27-19008-001 or P/N 27-
19008-002.

    The requirements of the AD will no longer apply when an actuator of 
improved design, P/N 27-19008-001 or P/N 27-19008-002, is installed. AD 
93-15-02 specified accomplishment of the freeplay measurements and 
inspections in accordance with the instructions in Fairchild Aircraft 
SA226 Series Service Letter (SL) 226-SL-005, and Fairchild Aircraft 
SA227 Series SL 227-SL-011, both Issued: April 8, 1993, Revised: April 
28, 1993, as applicable; and specified accomplishment of the pitch trim 
actuator replacement in accordance with the applicable maintenance 
manual.
    AD 93-15-02 was issued based on reports of two in-flight incidents 
where the above-referenced pitch trim actuator failed on Fairchild 
Aircraft SA226 and SA227 series airplanes. In one case, the horizontal 
stabilizer went full-nose down, and in the other instance, the 
horizontal stabilizer jammed. Fortunately, the pilots were able to 
safely land in both of these instances. Upon removal and inspection of 
each of these pitch trim actuators, fatigued barrel nuts were found and 
the actuator usage time was well over 5,000 hours time-in-service 
(TIS).
    After AD 93-15-02 became effective, the FAA received a report of an 
in-flight incident where the referenced actuator on one of the affected 
airplanes failed. The airplane operator had accomplished the 5,000-hour 
TIS initial inspection (with satisfactory results), but had not reached 
the 6,500-hour TIS mandatory replacement threshold.
    This prompted the FAA to revise AD 93-15-02 (to the R1 level, 
Amendment 39-9180, 60 FR 15667, March 27, 1995) to require the same 
repetitive inspections and actuator replacement as AD 93-15-02, but 
changes the compliance times by (1) reducing the number of hours time-
in-service (TIS) before the initial inspection is required; and (2) 
shortening both the time period between repetitive inspections and the 
actuator replacement compliance time, unless the replacement actuator 
is new or if the tube nut assemblies have been replaced during 
overhaul. Fairchild Aircraft revised the applicable service bulletins 
to reflect the inspection time changes. Accomplishment of the 
inspections required by AD 93-15-02 R1 is in accordance with the 
instructions in Fairchild Aircraft SA226 Series Service Letter (SL) 
226-SL-005, and Fairchild Aircraft SA227 Series SL 227-SL-011, both 
Issued: April 8, 1993, Revised: March 2, 1995, as applicable.
    AD 93-15-02 R1 inadvertently referenced incorrect compliance times 
for the first inspection for an actuator that is installed in 
accordance with AD 93-15-02 R1. That AD specifies repetitively 
inspecting the actuator at either 250 or 300-hour TIS intervals after 
replacing the actuator. The intent was to initially inspect upon 
accumulating 3,000, 5,000, or 7,500 hours TIS (depending on the type of 
actuator replacement) after installing the actuator, and repetitively 
inspecting every 250 or 300 hours TIS thereafter.
    In addition, the FAA has become aware of an additional replacement 
actuator that should be incorporated into the existing AD. This 
replacement actuator is a modified P/N DL5040M5 actuator that is re-
identified as P/N DL5040M6. Installation of this actuator would then 
require repetitive inspections and replacements.
    After examining all available information related to the subject 
discussed above, the FAA has determined that further AD action should 
be taken to correct these compliance times of AD 93-15-02 R1 and to 
prevent the horizontal stabilizer from going nose-down or jamming 
because of pitch trim actuator failure, which could result in loss of 
control of the airplane.
    Fairchild Aircraft has revised (dated May 22, 1996) SA226 Series SL 
226-SL-005 and SA227 Series 227-SL-011, to reflect the information 
discussed above.

Explanation of the Provisions of the AD

    Since an unsafe condition has been identified that is likely to 
exist or develop in other Fairchild Aircraft SA226 and SA227 series 
airplanes of the same type design that are equipped with a Simmonds-
Precision pitch trim actuator, P/N DL5040M5 or P/N DL5040M6, this AD 
requires the same repetitive inspections and actuator replacement as AD 
93-15-02 R1, but revises the initial inspection compliance times after 
installing the actuator as previously specified. This action 
incorporates Simmonds-Precision pitch trim actuator, P/N DL5040M6, as a 
replacement option that will then require repetitive inspections and 
replacements. The P/N DL5040M6 actuator can consist of a new part or a 
modified DL5040M5 actuator, both of which can be obtained from 
Simmonds-Precision.
    This action revises a previous action to correct an error in a 
final rule by changing the compliance time for the initial inspection 
after installing the actuator, and incorporates the additional 
replacement option. This change in the compliance time reduces the 
burden upon the public. The replacement option imposes the same burden 
that is currently required. Since this action does not impose any 
additional burden (financial or otherwise) upon the public than is 
already required by AD 93-15-02 R1 or than was previously required by 
AD 93-15-02, it is found that notice and prior public comment hereon 
are unnecessary.

Comments Invited

    Although this action is in the form of a final rule that involves 
requirements affecting immediate flight safety and, thus, was not 
preceded by notice and opportunity to comment, comments are invited on 
this rule. Interested persons are invited to comment on this rule by 
submitting such written data, views, or arguments as they may desire. 
Communications should identify the Rules Docket number and be submitted 
in triplicate to the address specified above. All communications 
received on or before the closing date for comments will be considered, 
and this rule may be amended in light of the comments received. Factual 
information that supports the commenter's ideas and

[[Page 36819]]

suggestions is extremely helpful in evaluating the effectiveness of the 
AD action and determining whether additional rulemaking action would be 
needed.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the rule that might 
suggest a need to modify the rule. All comments submitted will be 
available, both before and after the closing date for comments, in the 
Rules Docket for examination by interested persons. A report that 
summarizes each FAA-public contact concerned with the substance of this 
AD will be filed in the Rules Docket.

Regulatory Impact

    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) if promulgated, 
will not have a significant economic impact, positive or negative, on a 
substantial number of small entities under the criteria of the 
Regulatory Flexibility Act. A copy of the draft regulatory evaluation 
prepared for this action has been placed in the Rules Docket. A copy of 
it may be obtained by contacting the Rules Docket at the location 
provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing Amendment 39-9180 (60 FR 
15667, March 27, 1995), and by adding a new airworthiness directive to 
read as follows:

93-15-02 R2 Fairchild Aircraft: Amendment 39-9689; Docket No. 93-CE-
35-AD. Revises AD 93-15-02 R1, Amendment 39-9180.

    Applicability: All SA226 and SA227 series airplanes (all models 
and serial numbers), certificated in any category, that are equipped 
with a Simmonds-Precision pitch trim actuator, part number (P/N) 
DL5040M5 or P/N DL5040M6.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (d) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated in the body of this AD, unless 
already accomplished.
    To prevent failure of the pitch trim actuator, which could 
result in the horizontal stabilizer going nose-down or jamming, 
accomplish the following:

    Note 2: The paragraph structure of this AD is as follows:
    Level 1: (a), (b), (c), etc.
    Level 2: (1), (2), (3), etc.
    Level 3: (i), (ii), (iii), etc.
    Level 2 and Level 3 structures are designations of the Level 1 
paragraph they immediately follow.
    (a) Accomplish the following at the times specified in the chart 
in paragraph (b) of this AD:
    (1) Initial and repetitive inspections: Measure the freeplay 
(inspection) of the pitch trim actuator and inspect the actuator for 
rod slippage in accordance with the INSTRUCTIONS section of 
Fairchild Aircraft SA226 Series Service Letter (SL) 226-SL-005, and 
Fairchild Aircraft SA227 Series SL 227-SL-011, both Issued: April 8, 
1993, Revised: May 22, 1996, as applicable.
    (2) Initial and repetitive replacements: Replace the pitch trim 
actuator with one of the following in accordance with the 
instructions in the applicable maintenance manual at the times 
specified in the Initial Inspection and Repetititive Inspection 
columns of the chart in paragraph (b) of this AD and, replace the 
pitch trim actuator prior to further flight if certain freeplay 
limitations that are specified in the service letters are exceeded 
or if rod slippage is found.
    (i) A new Simmonds-Precision actuator, P/N DL5040M5 or DL5040M6.
    (ii) A pitch trim actuator with an overhauled, zero-timed part 
of the same design and part number.
    (iii) A new actuator of improved design, P/N 27- 19008-001 or 
27-19008-002. This replacement eliminates the repetitive inspection 
and replacement requirements of this AD, and may be accomplished at 
any time to eliminate the inspection requirement of this AD.
    (b) The following chart presents the initial and repetitive 
inspection and replacement compliance times of this AD:

----------------------------------------------------------------------------------------------------------------
              Condition                   Initial inspection     Repetitive inspection    Repetitive replacement
----------------------------------------------------------------------------------------------------------------
With an original Simmonds-Precision    Upon accumulating 3,000  Every 250 hours TIS      Initially upon         
 actuator, P/N DL5040M5, installed.     hours TIS on a           after initial            accumulating 5,000    
                                        Simmonds-Precision P/N   inspection until         hours TIS on the      
                                        DL5040M5 actuator or     accumulating 5,000       actuator or 500 hours 
                                        within 50 hours TIS      hours TIS on the         TIS after the initial 
                                        after April 17, 1995     actuator or 500 hours    inspection, whichever 
                                        (the effective date of   TIS after the last       occurs later, and     
                                        AD 93-15-02 R1),         inspection required by   thereafter as         
                                        whichever occurs later.  AD 93-15-02 R1,          indicated below.      
                                                                 whichever occurs later.                        
With a replacement Simmonds-Precision  Initially upon           Every 300 hours TIS      Upon accumulating 6,500
 actuator, P/N DL5040M5, installed.     accumulating 5,000       after the initial        hours TIS on the      
                                        hours TIS on the new     inspection until         actuator.             
                                        actuator.                accumulating 6,500                             
                                                                 hours TIS on the                               
                                                                 actuator.                                      
With a replacement Simmonds-Precision  Initially upon           Every 300 hours TIS      Upon accumulating 9,900
 actuator, P/N DL5040M6, installed.     accumulating 7,500       after the initial        hours TIS on the      
 This part can be new, modified from    hours TIS on the new     inspection until         actuator.             
 a P/N DL5040M5 actuator or             or modified actuator.    accumulating 9,900                             
 overhauled and zero-timed.                                      hours TIS on the                               
                                                                 actuator..                                     

[[Page 36820]]

                                                                                                                
With a replacement P/N DL5040M5        Initally upon            Every 300 hours TIS      Upon accumulating 6,500
 actuator installed that was            accumulating 5,000       after the initial        hours TIS on the      
 overhauled and zero-timed where both   hours TIS on the         inspection until         actuator.             
 nut assemblies, P/N AA56142, were      overhauled actuator.     accumulating 6,500                             
 replaced with new assemblies during                             hours TIS on the                               
 overhaul.                                                       actuator.                                      
With a replacement P/N DL5040M5        Initally upon            Every 250 hours TIS      Upon accumulating 5,000
 actuator installed that was            accumulating 3,000       after the initial        hours TIS on the      
 overhauled and zero-timed where both   hours TIS on the         inspection until         actuator.             
 nut assemblies, P/N AA56142, were      overhauled actuator.     accumulating 5,000                             
 not replaced with new assemblies                                hours TIS on the                               
 during overhaul.                                                actuator.                                      
With a pitch trim actuator of          No action necessary....  No action necessary....  No action necessary.   
 improved design installed, P/N 27-                                                                             
 19008-001 or 27-19008-002.                                                                                     
----------------------------------------------------------------------------------------------------------------

    (c) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (d) An alternative method of compliance or adjustment of the 
initial or repetitive compliance times that provides an equivalent 
level of safety may be approved by the Manager, Airplane 
Certification Office (ACO), FAA, 2601 Meacham Boulevard, Fort Worth, 
Texas 76193-0150. The request shall be forwarded through an 
appropriate FAA Maintenance Inspector, who may add comments and then 
send it to the Manager, Fort Worth ACO.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Fort Worth ACO.

    (e) The inspections and modification required by this AD shall 
be done in accordance with Fairchild Aircraft SA226 Series Service 
Letter 226-SL-005, and Fairchild Aircraft SA227 Series Service 
Letter 227-SL-011, both Issued: April 8, 1993, Revised: May 22, 
1996, as applicable. This incorporation by reference is approved by 
the Director of the Federal Register in accordance with 5 U.S.C. 
552(a) and 1 CFR part 51. Copies may be obtained from Field Support 
Engineering, Fairchild Aircraft, P.O. Box 790490, San Antonio, Texas 
78279-0490. Copies may be inspected at the FAA, Central Region, 
Office of the Assistant Chief Counsel, Room 1558, 601 E. 12th 
Street, Kansas City, Missouri, or at the Office of the Federal 
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
    (f) This amendment (39-9689) revises AD 93-15-02 R1, Amendment 
39-9180.
    (g) This amendment (39-9689) becomes effective on July 25, 1996.

    Issued in Kansas City, Missouri, on June 25, 1996.
James E. Jackson,
Acting Manager, Small Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-17483 Filed 7-12-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.