Federal Register final rules — 1996-09-23

issue-1996-09-23Federal Register final rules — 1996-09-23Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-24357 Digital Audio Recording Devices and Media; Verification of Statements of Account
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Page 49680]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24357]

=======================================================================
-----------------------------------------------------------------------

LIBRARY OF CONGRESS
Copyright Office
37 CFR Part 201

[Docket No. 93-2B]

Digital Audio Recording Devices and Media; Verification of 
Statements of Account
AGENCY: Copyright Office, Library of Congress.
ACTION: Extension of comment period.

-----------------------------------------------------------------------
SUMMARY: The Copyright Office is extending the comment period in its 
consideration of interim regulations that provide for the verification 
of the information contained in digital audio recording technology 
(DART) Statements of Account filed with the Office.
DATES: The extended deadline for comments is October 16, 1996, and for 
reply comments is November 18, 1996.
ADDRESSES: If sent by mail, fifteen copies of written comments should 
be addressed to Marilyn J. Kretsinger, Acting General Counsel, 
Copyright GC/I&R, P.O. Box 70400, Southwest Station, Washington, D.C. 
20024. Telephone: (202) 707-8380. Telefax: (202) 707-8366. If by hand, 
fifteen copies should be brought to: Office of the General Counsel, 
Copyright Office, James Madison Memorial Building, Room LM-407, First 
and Independence Avenue, S.E., Washington, D.C. 20540.
FOR FURTHER INFORMATION CONTACT: Marilyn J. Kretsinger, Acting General 
Counsel, Telephone: (202) 707-8380 or Telefax: (202) 707-8366.
SUPPLEMENTARY INFORMATION: On June 18, 1996, the Copyright Office 
published interim regulations providing for the verification of the 
information contained in digital audio recording technology (DART) 
Statements of Account filed with the Office. 61 FR 30808 (June 18, 
1996). To allow interested parties more time to submit comments, the 
Office is extending the comment period from September 16, 1996, to 
October 16, 1996, and the deadline for reply comments from October 16, 
1996, to November 16, 1996.

    Dated: September 18, 1996.
Marilyn J. Kretsinger,
Acting General Counsel.
[FR Doc. 96-24357 Filed 9-20-96; 8:45 am]
BILLING CODE 1410-30-U

Complete official Federal Register PDF

FR Doc. 96-24356 Safety Zones, Security Zones, and Special Local Regulations
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49678-49680]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24356]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Parts 100 and 165

[CGD 96-047]

Safety Zones, Security Zones, and Special Local Regulations

AGENCY: Coast Guard, DOT.

ACTION: Notice of temporary rules issued.

-----------------------------------------------------------------------

SUMMARY: This document provides required notice of substantive rules 
adopted by the Coast Guard and temporarily effective between July 1, 
1996 and September 18, 1996, which were not published in the Federal 
Register. This quarterly notice lists temporary local regulations, 
security zones, and safety zones, which were of limited duration and 
for which timely publication in the Federal Register was not possible.

DATES: This document lists temporary Coast Guard regulations that 
became effective and were terminated between July 1, 1996 and September 
18, 1996, as well as several regulations which were not included in the 
previous quarterly list.

ADDRESSES: The complete text of these temporary regulations may be 
examined at, and is available on request, from Executive Secretary, 
Marine Safety Council (G-LRA), U.S. Coast Guard Headquarters, 2100 
Second Street, SW., Washington, DC 20593-0001.

FOR FURTHER INFORMATION CONTACT:
Commander Stephen J. Darmody, Executive Secretary, Marine Safety 
Council at (202) 267-1477 between the hours of 8 a.m. and 3 p.m., 
Monday through Friday.

SUPPLEMENTARY INFORMATION: District Commanders and Captains of the Port 
(COTP) must be immediately responsive to the safety needs of the waters 
within their jurisdiction; therefore, District Commanders and COTPs 
have been delegated the authority to issue certain local regulations. 
Safety zones may be established for safety or environmental purposes. A 
safety zone may be stationary and described by fixed limits or it may 
be described as a zone around a vessel in motion. Security zones limit 
access to vessels, ports, or waterfront facilities to prevent injury or 
damage. Special local regulations are issued to enhance the safety of 
participants and spectators at regattas and other marine events. Timely 
publication of these regulations in the Federal Register is often 
precluded when a regulation responds to an emergency, or when an event 
occurs without sufficient advance notice. However, the affected public 
is informed of these regulations through Local Noticers to Marines, 
press releases, and other means. Moreover, actual notification is 
provided by Coast Guard patrol vessels enforcing the restrictions 
imposed by the regulation. Because mariners are notified by Coast Guard 
officials on-scene prior to enforcement action, Federal Register notice 
is not required to place the special local regulation, security zone, 
or safety zone in effect. However, the Coast Guard, by law, must 
publish in the Federal Register notice of substantive rules adopted. To 
discharge this legal obligation without imposing undue expense on the 
public, the Coast Guard periodically publishes a list of these 
temporary special local regulations, security zones, and safety zones. 
Permanent regulations are not included in this list because they are 
published in their entirety in the Federal Register. Temporary 
regulations may also be published in their entirety if sufficient time 
is available to do so before they are placed in effect or terminated. 
These safety zones, special local regulations and security zones have 
been exempted from review under E.O. 12866 because of their emergency 
nature, or limited scope and temporary effectiveness.
    The following regulations were placed in effect temporarily during 
the period July 1, 1996 and September 18, 1996, unless otherwise 
indicated.
Stephen J. Darmody,
Commander, U.S. Coast Guard, Executive Secretary, Marine Safety 
Council.

                                                Quarterly Report                                                
----------------------------------------------------------------------------------------------------------------
            Docket No.                       Location                       Type                Effective date  
----------------------------------------------------------------------------------------------------------------
Corpus Christi 96-009.............  Corpus Christi Ship         Safety Zone................  8/2/96             
                                     Channel.                                                                   
Guam 96-001.......................  Cocos Island Reef, Guam...  Safety Zone................  3/7/96             
Guam 96-002.......................  Apra, Guam................  Safety Zone................  3/27/96            
Guam 96-004.......................  Sasanhaya East Harbor,      Safety Zone................  5/2/96             
                                     Rota.                                                                      
Guam 96-005.......................  Rota......................  Safety Zone................  5/2/96             
Guam 96-008.......................  Outer Apra Harbor, Guam...  Safety Zone................  7/31/96            
Houston-Galveston 96-008..........  Houston, TX...............  Safety Zone................  6/21/96            
Houston-Galveston 96-009..........  Houston, TX...............  Safety Zone................  7/4/96             
Houston-Galveston 96-010..........  Houston, TX...............  Safety Zone................  6/27/96            
LA/Long Beach 96-013..............  San Pedro Bay, CA.........  Safety Zone................  6/30/96            
LA/Long Beach 96-013..............  San Pedro Bay, CA.........  Safety Zone................  6/30/96            
LA/Long Beach 96-014..............  Carpinteria, CA...........  Safety Zone................  7/12/96            
LA/Long Beach 96-015..............  San Pedro Bay, CA.........  Safety Zone................  7/19/96            
LA/Long Beach 96-016..............  San Pedro Bay, CA.........  Safety Zone................  7/25/96            
LA/Long Beach 96-020..............  Huntington Beach, CA......  Safety Zone................  9/6/96             
Miami 96-047......................  Kew West, FL..............  Safety Zone................  7/13/96            
Mobile 96-20......................  Gulf of Mexico, AL........  Safety Zone................  7/13/96            
Pittsburgh 96-002.................  Pittsburgh, PA............  Security Zone..............  8/18/96            
Port Arthur 96-08.................  Beaumont, TX..............  Safety Zone................  7/5/96             
San Diego Bay 96-003..............  San Diego, CA.............  Safety Zone................  8/10/96            
Savannah 96-042...................  Hilton Head Island, SC....  Safety Zone................  7/4/96             
Savannah 96-043...................  Savannah River, Savannah,   Safety Zone................  7/20/96            
                                     GA.                                                                        
Western Alaska 95-001.............  Cook Inlet, AK............  Safety Zone................  7/25/96            
Western Alaska 96-002.............  Cook Inlet, AK............  Safety Zone................  7/27/96            
01-95-059.........................  Guilford, CT..............  Safety Zone................  7/5/96             
01-95-063.........................  Groton, CT................  Safety Zone................  7/6/96             
01-96-008.........................  Winter Harbor Lobster Boat  Special Local..............  8/10/96            
                                     Race, Winter Ha.                                                           

[[Page 49679]]

                                                                                                                
01-96-015.........................  New Bedford, MA...........  Special Local..............                     
01-96-069.........................  Narragansett Bay, RI......  Special Local..............  7/9/96             
01-96-070.........................  Upper New York Bay, NY and  Safety Zone................  7/15/96            
                                     NJ.                                                                        
01-96-071.........................  Peekskill Bay, NY.........  Safety Zone................  7/27/96            
01-96-076.........................  Danvers River, Salem, MA..  Safety Zone................  8/2/96             
01-96-079.........................  Newport, Jamestown, RI....  Security Zone..............  7/18/96            
01-96-080.........................  Rockaway Park, NY.........  Safety Zone................  8/6/96             
01-96-087.........................  Boston, MA................  Safety Zone................  9/6/96             
01-96-088.........................  COHASSET, MA..............  Safety Zone................  8/17/96            
01-96-098.........................  Cape Code, MA.............  Safety and Sec.............  8/3/96             
01-96-102.........................  Boston, MA................  Safety Zone................  8/15/96            
01-96-103.........................  Providence, RI............  Special Local..............  8/16/96            
01-96-104.........................  Queens, NY................  Security Zone..............  8/18/96            
01-96-116.........................  Boston, MA................  Safety Zone................  9/11/96            
02-96-008.........................  Davenport, IA.............  Special Local..............  7/5/96             
05-96-041.........................  Delaware River,             Special Local..............  7/7/96             
                                     Philadelphia, PA.                                                          
05-96-046.........................  Portsmouth, VA............  Special Local..............  7/4/96             
05-96-049.........................  Chester, PA...............  Safety Zone................  7/2/96             
05-96-050.........................  Delaware River, Westville,  Safety Zone................  7/1/96             
                                     NJ.                                                                        
05-96-051.........................  Delaware River............  Safety Zone................  7/1/96             
05-96-054.........................  Delaware Bay, Delaware      Safety Zone RE.............  7/7/96             
                                     River.                                                                     
05-96-055.........................  James, Elizabeth, York      Safety Zone................  7/12/96            
                                     River, VA.                                                                 
05-96-057.........................  Delaware River, Gibbstown,  Safety Zone................  7/17/96            
                                     NJ.                                                                        
05-96-058.........................  Elizabeth River, VA.......  Safety Zone................  7/16/96            
05-96-059.........................  Hampton Roads and           Safety Zone................  7/24/96            
                                     Elizabeth River, VA.                                                       
05-96-060.........................  Delaware River, Marcus      Safety Zone................  7/23/96            
                                     Hook, PA.                                                                  
05-96-061.........................  Chesapeake Bay, MD........  Safety Zone................  7/27/96            
05-96-062.........................  Delaware Bay, Delaware      Safety Zone................  7/29/96            
                                     River.                                                                     
05-96-066.........................  James River, VA...........  Safety Zone................  8/5/96             
05-96-075.........................  Salem River, New Jersey...  Safety Zone................  9/2/96             
05-96-076.........................  Delaware River............  Safety Zone................  9/3/96             
05-96-078.........................  Hampton Roads, VA and       Safety Zone................  9/5/96             
                                     vicinity.                                                                  
05-96-080.........................  James River, VA and         Safety Zone................  9/7/96             
                                     vicinity.                                                                  
08-96-016.........................  Kanawha River, M. 46 to M.  Special Local..............  7/6/96             
                                     47.                                                                        
08-96-017.........................  Mississippi River, M.       Special Local..............  7/3/96             
                                     202.5 to M. 203.5.                                                         
08-96-018.........................  Mississippi River, M. 518   Special Local..............  7/3/96             
                                     to M. 519.                                                                 
08-96-019.........................  Mississippi River, M.       Special Local..............  7/4/96             
                                     179.2 to M. 180.                                                           
08-96-020.........................  Mississippi River, M. 634   Special Local..............  7/6/96             
                                     to M. 635.                                                                 
08-96-021.........................  Arkansas River, M. 307.5    Special Local..............  7/4/96             
                                     to M. 309.5.                                                               
08-96-022.........................  Mississippi River, M. 383   Special Local..............  7/4/96             
                                     to M. 384.                                                                 
08-96-023.........................  Ohio River, M. 943 to M.    Special Local..............  7/4/96             
                                     944.3.                                                                     
08-96-024.........................  Ohio River, M. 934 to M.    Special Local..............  7/3/96             
                                     935.                                                                       
08-96-027.........................  Cumberland River, M. 190    Special Local..............  7/4/96             
                                     to M. 191.                                                                 
08-96-028.........................  Mississippi River, M. 748   Safety Zone................  4/19/96            
                                     to M. 755.                                                                 
08-96-030.........................  Ohio River, M. 934 to M.    Special Local..............  7/27/96            
                                     935.                                                                       
08-96-031.........................  Illinois River, M. 179.5    Special Local..............  7/28/96            
                                     to M. 180.5.                                                               
08-96-032.........................  Missouri River, M. 68 to    Special Local..............  7/28/96            
                                     M. 69.                                                                     
08-96-035.........................  Mississippi River, M. 482   Special Local..............  7/25/96            
                                     to M. 483.                                                                 
08-96-036.........................  Mississippi River, M. 790   Special Local..............  8/3/96             
                                     to M. 792.                                                                 
08-96-037.........................  Ohio River MI. 221 to 222.  Special Local..............  8/10/96            
08-96-042.........................  Tennessee River, M. 255.5   Special Local..............  7/4/96             
                                     to M. 256.3.                                                               
08-96-043.........................  Mississippi River, M.       Special Local..............  7/20/96            
                                     813.6 to M. 815.                                                           
09-96-006.........................  Seven Sisters Smoke         Safety Zone................  8/10/96            
                                     Stacks, Detroit River.                                                     
09-96-008.........................  Grand River, MI...........  Drawbridge.................  8/5/96             
09-96-011.........................  Maumee River..............  Security Zone..............  8/26/96            
13-96-012.........................  Kennewick, WA.............  Special Local..............  7/22/96            
13-96-018.........................  Kennewick, WA.............  Safety Zone................  7/4/96             
13-96-019.........................  Portland, OR..............  Safety Zone................  7/4/96             
13-96-020.........................  Portland, OR..............  Safety Zone................  7/4/96             
13-96-021.........................  Richland, VA..............  Safety Zone................  7/5/96             
13-96-022.........................  Astoria, OR...............  Safety Zone................  7/4/96             
13-96-023.........................  Port Townsend, WA.........  Safety Zone................  7/4/96             
13-96-024.........................  Seattle, WA...............  Special Local..............  8/1/96             
13-96-025.........................  Bellingham, WA............  Safety Zone................  7/14/96            
13-96-026.........................  Seattle, WA...............  Safety Zone................  7/31/96            
13-96-027.........................  Astoria, OR...............  Safety Zone................  8/10/96            
13-96-029.........................  Seattle, WA...............  Safety Zone................  8/10/96            
13-96-030.........................  Portland, OR..............  Safety Zone................  9/3/96             
13-96-031.........................  Benton, WA................  Safety Zone................  9/5/96             
13-96-034.........................  Benton, WA................  Safety Zone................  9/12/96            
----------------------------------------------------------------------------------------------------------------

[[Page 49680]]

[FR Doc. 96-24356 Filed 9-20-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-24355 Electrical Engineering Requirements for Merchant Vessels
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Page 49691]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24355]

[[Page 49691]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

46 CFR Parts 110 and 161

[CGD 94-108]
RIN 2115-AF24

Electrical Engineering Requirements for Merchant Vessels

AGENCY: Coast Guard, DOT.

ACTION: Correction to interim rule.

-----------------------------------------------------------------------

SUMMARY: This document contains corrections to the interim rule that 
was published June 4, 1996, as part of the President's Regulatory 
Reinvention Initiative. The interim rule amends the Coast Guard's 
electrical engineering regulations.

EFFECTIVE DATE: September 23, 1996.

FOR FURTHER INFORMATION CONTACT: Mr. Gerald P. Miante, Project Manager, 
Office of Design and Engineering Standards (G-MSE), (202) 267-2206.

SUPPLEMENTARY INFORMATION: 

Background

    The interim rule that is the subject of these corrections amends 
the Coast Guard's electrical engineering regulations to reduce the 
regulatory burden on the marine industry, purge obsolete regulation, 
and replace prescriptive requirements with performance-based 
regulations that incorporate international standards.

Need for Correction

    Based upon review of the interim rule by the Office of the Federal 
Register, the following corrections were identified as necessary to 
avoid confusion by the reader.

Correction of Publication

    Accordingly, the publication on June 4, 1996, of the interim rule 
at 61 FR 28260, which was the subject of FR Doc. 96-13416, is corrected 
as follows:

Sec. 110.10-1   [Corrected]

    1. On page 28273, in the list of National Fire Protection 
Association standards, in the list of sections affected for NFPA 70, 
National Electrical Code (NEC), after ``111.50-3(c);'', add ``111.50-
7;''.
    2. On page 28292, in the second column, the amendatory paragraph 
217 should read as follows: 217. In Sec. 161.002-10, in paragraph (b), 
revise the paragraph heading and paragraph (b)(1) to read as follows; 
in paragraph (b)(2), remove ``signal'' in the paragraph heading and 
add, in its place, ``alarm'' and remove ``signals'' and add, in its 
place, ``alarms''; in paragraph (b)(3), remove ``signal'' in the 
paragraph heading and add, in its place, ``alarm'', remove ``fire 
bells'' and add, in its place, ``audible fire alarms'', remove ``fire 
bell'' and add, in its place, ``audible fire alarm'', and remove ``fire 
signal'' and add, in its place, ``fire alarm''; in paragraph (b)(4), 
remove ``alarm signals simultaneously'' and add, in its place, ``alarms 
simultaneously'', remove ``fire alarm bells'' and add, in its place, 
``audible fire alarms'', and remove ``succeeding fire alarm signals'' 
and add, in its place, ``succeeding sensor signals''; in paragraph 
(b)(5), remove ``signals'' and add, in its place, ``alarms''; in 
paragraph (c)(3), remove ``Fire bells'' in the paragraph heading and 
add, in its place, ``Audible fire alarms'' and remove ``fire bell'' and 
add, in its place, ``audible fire alarm''; in the heading to paragraph 
(d), remove ``alarm signals'' and add, in its place, ``alarms''; in 
paragraph (d)(1), in the first sentence, remove ``bell'', in the second 
sentence, remove ``power failure'' and ``bell'', and, in the third 
sentence, remove ``power failure alarm bell for'' and add, in its 
place, ``alarm of''; in paragraph (d)(2), in the paragraph heading, 
remove ``signal'' and add, in its place, ``alarm'' and remove ``power 
failure alarm bell'' and add, in its place, ``audible power failure 
alarm''; in paragraph (e), in the paragraph heading, remove ``alarm 
signals'' and add, in its place, ``alarms'', in paragraph (e)(1), 
remove ``bell or buzzer'', and remove ``fire alarm signal'' and add, in 
its place, ``fire alarm''; paragraph (e)(2) is revised to read as 
follows; in paragraph (e)(3), remove ``alarm signals'' and add, in its 
place, ``alarms'' and remove ``alarm signal'' and add, in its place, 
``alarm''; in paragraph (e)(4), remove ``alarm signals'' and add, in 
its place, ``alarms''; in paragraph (f)(1), remove ``fire alarm 
condition'' and add, in its place, ``fire condition''; and paragraphs 
(i) through (m) are removed:

Sec. 161.002-10   Automatic fire detecting system control unit.

* * * * *
    (b) Fire alarms--(1) General. The operation of a fire detecting and 
alarm system must cause automatically--
    (i) The sounding of a vibrating type fire bell with a gong diameter 
not smaller than 15 cm (6 inches) or other audible alarm that has an 
equivalent sound level and that is mounted at the control unit and at 
the remote annunciator panel, when provided;
    (ii) The sounding of a vibrating type fire bell with a gong 
diameter not smaller than 20 cm (8 inches) or other audible alarm that 
has an equivalent sound level and that is located in the engine room; 
and
    (iii) an indication of the fire detecting zone from which the 
signal originated, visible at the control unit and at the remote 
annunciator panel, when provided;
* * * * *
    (e) * * *
    (2) Silencing audible alarm. Manual means shall be provided at the 
control unit to silence the audible alarm. Operation of the silencing 
means shall permit the visible alarm to remain until the trouble has 
been corrected.
* * * * *
    Dated: September 17, 1996.
Joseph J. Angelo,
Director of Standards, Marine Safety and Environmental Protection.
[FR Doc. 96-24355 Filed 9-20-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-24318 Fisheries of the Exclusive Economic Zone Off Alaska; Pollock in Statistical Area 610
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Page 49696]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24318]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 679

[Docket No. 960129018-6018-01; I.D. 091796B]

Fisheries of the Exclusive Economic Zone Off Alaska; Pollock in 
Statistical Area 610

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is prohibiting directed fishing for pollock in 
Statistical Area 610 of the Gulf of Alaska (GOA). This action is 
necessary to prevent exceeding the 1996 pollock total allowable catch 
(TAC) in this area.

EFFECTIVE DATE: 1200 hrs, Alaska local time (A.l.t.), September 18, 
1996, until 2400 hrs, December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Mary Furuness, 907-586-7228.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the GOA exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for Groundfish of the Gulf of Alaska (FMP) prepared by the North 
Pacific Fishery Management Council under authority of the Magnuson 
Fishery Conservation and Management Act. Fishing by U.S. vessels is 
governed by regulations implementing the FMP at subpart H of 50 CFR 
part 600 and 50 CFR part 679.
    The 1996 pollock TAC in Statistical Area 610 was established by the 
Final 1996 Harvest Specifications of Groundfish (61 FR 4304, February 
5, 1996) as 25,480 metric tons (mt). (See Sec. 679.20(c)(3).)
    The Administrator, Alaska Region, NMFS (Regional Administrator), 
has determined, in accordance with Sec. 679.20(d)(1), that the 1996 
pollock TAC in Statistical Area 610 soon will be reached. The Regional 
Administrator established a directed fishing allowance of 24,680 mt, 
and has set aside the remaining 800 mt as bycatch to support other 
anticipated groundfish fisheries. Consequently, NMFS is prohibiting 
directed fishing for pollock in Statistical Area 610.
    Maximum retainable bycatch amounts may be found in the regulations 
at Sec. 679.20(e).

Classification

    This action is taken under 50 CFR 672.20 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: September 17, 1996.
Bruce Morehead,
Acting Director, Office of Sustainable Fisheries, National Marine 
Fisheries Service.
[FR Doc. 96-24318 Filed 9-18-96; 12:54 pm]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-24317 Prohibition Against Certain Flights Within the Territory and Airspace of Iran
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49870-49871]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24317]

[[Page 49869]]

_______________________________________________________________________

Part III

Department of Transportation

_______________________________________________________________________

Federal Aviation Administration

_______________________________________________________________________

14 CFR Part 91

Prohibition Against Certain Flights Within the Territory and Airspace 
of Iran; Final Rule

Federal Register / Vol. 61, No. 185 / Monday, September 23, 1996 / 
Rules and Regulations

[[Page 49870]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 91

[Docket No. 28690; Special Federal Aviation Regulation (SFAR) No. 76]
RIN 2120-AG28

Prohibition Against Certain Flights Within the Territory and 
Airspace of Iran

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action prohibits flight operations within the territory 
and airspace of Iran by any United States air carrier or commercial 
operator, by any person exercising the privileges of an airman 
certificate issued by the FAA except persons operating U.S.-registered 
aircraft for a foreign air carrier, or by an operator using an aircraft 
registered in the United States unless the operator of such aircraft is 
a foreign air carrier. Increased military presence and activity 
adjacent to civilian air traffic corridors in Iran have increased the 
potential threat to civil aircraft overflying the area. Therefore, this 
action is taken to prevent an undue hazard to persons and U.S.-
registered aircraft overflying the area as a result of the ongoing 
activity in that area.

DATES: This SFAR is effective September 17, 1996, and shall remain in 
effect until further notice.

FOR FURTHER INFORMATION CONTACT:
Patricia Lane, Airspace and Air Traffic Law Branch, AGC-230, or Mark W. 
Bury, International Affairs and Legal Policy Staff, AGC-7, Office of 
the Chief Counsel, Federal Aviation Administration, 800 Independence 
Avenue, SW., Washington, DC 20591. Telephone: (202) 267-3515.

SUPPLEMENTARY INFORMATION:

Availability of Document

    An electronic copy of this document may be down loaded using a 
modem and suitable communications software from the FAA regulations 
section of the Fedworld electronic bulletin board service (telephone: 
703-321-3339), the Federal Register's electronic bulletin board service 
(telephone: 202-512-1661), or the FAA's Aviation Rulemaking Advisory 
Committee Bulletin Board service (telephone: 202-267-5948).
    Internet users may reach the FAA's web page at http://www.faa.gov 
or the Federal Register's webpage at http://www.access.gpo.gov/su__docs 
for access to recently published rulemaking documents.
    Any person may obtain a copy of this document by submitting a 
request to the Federal Aviation Administration, Office of Rulemaking, 
Attention: ARM-1, 800 Independence Avenue, SW., Washington, DC 20591, 
or by calling (202) 267-9677. Communications must identify the number 
of this SFAR.
    Persons interested in being placed on a mailing list for future 
rules should also request a copy of Advisory Circular No. 11-2A, which 
describes the application procedure.

Background

    The Federal Aviation Administration (FAA) is responsible for the 
safety of flight in the United States and for the safety of U.S.-
registered aircraft and U.S. operators throughout the world. Section 
40101(d)(1) of Title 49, United States Code, requires the Administrator 
of the FAA to consider the regulation of air commerce in a manner that 
best promotes safety and fulfills the requirements of national security 
as being in the public interest. Section 44701(a) of Title 49, United 
States Code, provides the FAA with broad authority to carry out this 
policy by prescribing regulations governing the practices, methods, and 
procedures necessary to ensure safety in air commerce.
    In mid-September 1996, Iran established an I-HAWK surface-to-air 
missile launch site near the Iran-Turkey border. This new active SAM 
site is located approximately seven miles southeast of Uromiyeh 
Airfield (37 deg.40'N/04 deg.50'4'' E). In the exercise of these 
statutory responsibilities, the FAA has determined that the presence of 
the missile launch site in proximity to civilian air traffic corridors 
has increased the potential threat to civil aircraft and justifies the 
imposition of certain measures to ensure the safety of U.S.-registered 
aircraft and operators that are conducting flight operations in the 
vicinity of the territory and airspace of Iran.

Prohibition Against Certain Flights Within the Territory and Airspace 
of Iran

    On the basis of the above information, and in furtherance of my 
responsibilities to promote the safety of flight of civil aircraft in 
air commerce, I have determined that immediate action by the FAA is 
required to prevent the injury or loss of certain U.S.-registered 
aircraft and U.S. operators conducting flights in the vicinity of Iran. 
I find that the presence of an active I-HAWK surface-to-air missile 
launch site in close proximity to civilian air traffic corridors has 
increased the potential threat to civil aircraft overflying the 
territory and airspace of Iran. Accordingly, I am ordering a 
prohibition of flight operations within the territory and airspace of 
Iran by any United States carrier and commercial operator, by any 
person exercising the privileges of an airman certificate issued by the 
FAA except persons operating U.S.-registered aircraft for a foreign air 
carrier, or by an operator using an aircraft registered in the United 
States unless the operator of such aircraft is a foreign air carrier. 
This action is necessary to prevent an undue hazard to U.S.-registered 
aircraft and to protect persons on board that aircraft. Operations 
approved by the Administrator, or by another agency of the United 
States Government with FAA approval and certain emergency operations 
shall be excepted from the prohibition. Because the circumstances 
described in this SFAR warrant immediate action by the FAA to maintain 
the safety of flight, I also find that notice and public comment under 
5 U.S.C. 553(b) are impracticable and contrary to the public interest. 
Further, I find that good cause exists for making this rule effective 
immediately upon issuance. I also find that this action is fully 
consistent with my obligations under 49 U.S.C. 40105(b)(1)(A) to ensure 
that I exercise my duties consistently with the obligations of the 
United States under international agreements. The Department of State 
has been advised of, and has no objection to, the action taken herein.
    This rule shall remain effective until further notice.

Regulatory Evaluation

Benefits

    This regulation will generate potential benefits in the form of 
ensuring that the current acceptable level of safety continues for U.S. 
air carriers and other operators. The potential benefits of this action 
will accrue only to those air carriers and other operators currently 
engaging in overflights of the territory of Iran. Since this action is 
promulgated prior to the occurrence of a serious incident resulting in 
loss of life or damage to or destruction of property, there are no 
statistics from which a quantitative estimate of benefits can be 
derived.

Costs

    The SFAR will impose a potential incremental cost of compliance in 
the form of the circumnavigation (including the additional time for 
preflight planning) of the territory and airspace of

[[Page 49871]]

Iran. Based on information available to informed FAA personnel, there 
are three U.S. air carriers currently conducting flights within Iranian 
airspace and over the territory of Iran. In addition, there may be 
overflights of Iranian territory by other U.S. civil aviation. The FAA 
believes that these operators will be the only entities affected by 
this action. These operators will incur costs for additional fuel and 
time as the result of diverting from their normal flight routes over 
Iran between Europe, Africa, and Asia. This action will impose costs in 
the form of additional preflight planning and circumnavigation of 
Iranian territory. The FAA seeks comment on the economic effects of 
this rule.

Regulatory Flexibility Determination

    The Regulatory Flexibility Act of 1980 (RFA) was enacted by 
Congress to ensure that small entities are not unnecessarily and 
disproportionately burdened by Federal regulations. The RFA requires a 
Regulatory Flexibility Analysis if a proposed rule would have 
``significant economic impact on a substantial number of small 
entities.'' FAA Order 2100.14A outlines the FAA's procedures and 
criteria for implementing the RFA. The FAA has determined that none of 
the U.S. air carriers affected by the SFAR are ``small entities'' as 
defined by FAA Order 2100.14A. Thus, the SFAR would not impose a 
``significant economic impact on a substantial number of small 
entities.''

Paperwork Reduction Act

    This rule contains no information collection requests requiring 
approval of the Office of Management and Budget pursuant to the 
Paperwork Reduction Act of 1995 (44 U.S.C. 3507 et seq.).

International Trade Impact Assessment

    This final rule could have an impact on the international flights 
of U.S. air carriers and commercial operators because it will restrict 
their ability to overfly the territory of Iran and, therefore, may 
impose additional costs relating to the circumnavigation of Iranian 
territory and airspace. This final rule, however, will not restrict the 
ability of foreign air carriers to overfly Iranian territory. Given the 
narrow scope of this rule, it will not eliminate existing or create 
additional barriers to the sale of foreign aviation products in the 
United States or to the sale of U.S. aviation products and services in 
foreign countries.

Federalism Determination

    The SFAR set forth herein will not have substantial direct effects 
on the states, on the relationship between the national government and 
the states, or on the distribution of power and responsibilities among 
the various levels of government. Therefore, in accordance with 
Executive Order 12612 (52 FR 41685; October 30, 1987), it is determined 
that this regulation does not have federalism implications warranting 
the preparation of a Federalism Assessment.

Conclusion

    For the reasons set forth above, FAA has determined that this 
action is a ``significant regulatory action'' under Executive Order 
12866. This action is considered a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979). 
The FAA has determined that none of the U.S. air carriers affected by 
the SFAR are ``small entities'' as defined by FAA Order 2100.14A. Thus, 
the FAA certifies that this rule will not have a significant economic 
impact, positive or negative, on a substantial number of small entities 
under the criteria of the Regulation Flexibility Act.

List of Subjects in 14 CFR Part 91

    Aircraft, Airmen, Airports, Air traffic control, Aviation safety, 
Freight, Iran.

The Amendment

    For the reasons set forth above, the Federal Aviation 
Administration is amending 14 CFR part 91 as follows:

PART 91--GENERAL OPERATING AND FLIGHT RULES

    1. The authority citation for part 91 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120, 44101, 44111, 
44701, 44709, 44711, 44712, 44715, 44716, 44717, 44722, 46306, 
46315, 46316, 46502, 46504, 46506-46507, 47122, 47508, 47528-47531.

    2. Special Federal Aviation Regulation (SFAR) No. 76 is added to 
read as follows:

Special Federal Aviation Regulation No. 76--Prohibition Against Certain 
Flights Within the Territory and Airspace of Iran

    1. Applicability. This rule applies to the following persons:
    (a) All U.S. air carriers and commercial operators;
    (b) All persons exercising the privileges of an airman certificate 
issued by the FAA except such persons operating U.S.-registered 
aircraft for a foreign air carrier; or
    (c) All operators of aircraft registered in the United States 
except where the operator of such aircraft is a foreign air carrier.
    2. Flight Prohibition. Except as provided in paragraphs 3 and 4 of 
this SFAR, no person described in paragraph 1 may conduct flight 
operations over or within the territory and airspace of Iran.
    3. Permitted Operations. This SFAR does not prohibit persons 
described in paragraph 1 from conducting flight operations over or 
within the territory and airspace of Iran where such operations are 
authorized by an exemption issued by the Administrator.
    4. Emergency Situations. In an emergency that requires immediate 
decision and action for the safety of the flight, the pilot in command 
of an aircraft may deviate from this SFAR to the extent required by 
that emergency. Except for U.S. air carriers and commercial operators 
that are subject to the requirements of 14 CFR part 119, 121, or 135, 
each person who deviates from this rule shall, within ten (10) days of 
the deviation, excluding Saturdays, Sundays, and Federal holidays, 
submit to the nearest FAA Flight Standards District Office a complete 
report of the operations of the aircraft involved in the deviation, 
including a description of the deviation and the reasons therefore.
    5. Expiration. This Special Federal Aviation Regulation will remain 
in effect until further notice.

    Issued in Washington, DC, on September 17, 1996.
David R. Hinson,
Administrator.
[FR Doc. 96-24317 Filed 9-18-96; 12:54 pm]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-24261 Changes in Form No. 1 Instructions
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49662-49678]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24261]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 141

[Docket No. RM96-17-000; Order No. 590]

Changes in Form No. 1 Instructions

    Issued September 16, 1996.

Agency: Federal Energy Regulatory Commission, DOE.

Action: Final Rule.

-----------------------------------------------------------------------

Summary: The Federal Energy Regulatory Commission is modifying the 
instructions for the filing of FERC Form No. 1, ``Annual report of 
Major electric utilities, licensees and others,'' to make them clearer 
and to make it easier to file the Form electronically.

Effective date: This final rule is effective on October 23, 1996.

For Further Information Contact:
Joseph C. Lynch (Legal Information), Office of the General Counsel, 
Federal Energy Regulatory Commission, 888 First St. N.E., Washington, 
D.C. 20426, (202) 208-2128
Robert J. Lynch (Technical Information), Office of the Chief 
Accountant, Federal Energy Regulatory Commission, 888 First St. N.E., 
Washington, D.C. 20426, (202) 219-3012.

Supplementary Information: In addition to publishing the full text of 
this document in the Federal Register, the Commission also provides all 
interested persons an opportunity to inspect or copy the contents of 
this document during normal business hours in the Public Reference Room 
at 888 First Street. NE., Washington, DC. 20426.
    The Commission Issuance Posting System (CIPS), an electronic 
bulletin board service, provides access to the texts of formal 
documents issued by the Commission. CIPS is available at no charge to 
the user and may be accessed using a personal computer with a modem by 
dialing (202) 208-1397 if dialing locally, or 1-800-856-3920 if dialing 
long distance. CIPS is also available through the FedWorld System (by 
modem or Internet). To access CIPS, set your communications software to 
19200, 14400, 12000, 9600, 7200, 4800, 2400 or 1200bps, full duplex, no 
parity, 8 data bits, and 1 stop bit. The full text of this document 
will be available on CIPS indefinitely in ASCII and WordPerfect 5.1 
format for one year. The complete text on diskette in WordPerfect 
format may also be purchased from the Commission's copy contractor, La 
Dorn Systems Corporation, also located in the Public Reference Room at 
888 First Street NE., Washington, DC. 20426.

    Issued: September 16, 1996.

I. Introduction

    On December 29, 1994, the Commission amended its regulations to 
provide for the electronic filing of FERC Form No. 1, ``Annual report 
of Major electric utilities, licensees and others'' (Form No. 1).1 
The Commission directed that, beginning with reporting year 1994 (for 
which reports were due on or before May 31, 1995),2 parties would 
submit to the Commission a computer diskette with the Form No. 1 
information on it, in addition to the required number of paper copies. 
The Commission concluded that the change would yield significant 
benefits, including more timely analysis and publication of data and 
reduced cost of data entry and retrieval. Aside from requiring 
electronic filing of Form No. 1, the Commission otherwise left Form No. 
1 unchanged.
---------------------------------------------------------------------------

    \1\ Electronic Filing of FERC Form No. 1 and Delegation to Chief 
Accountant, Order No. 574, 60 FR 1716 (Jan. 5, 1995), FERC Stats. & 
Regs. Regulations Preambles 1991-1996 para. 31,013 (1994) 
(Electronic Filing I), reconsid. denied, 70 FERC para. 61,330 (1995) 
(Electronic Filing II).
    \2\ Electronic Filing II, 70 FERC at 62,020.
---------------------------------------------------------------------------

    The Commission is now amending the instructions for filing Form No. 
1 to eliminate ambiguity and to make it easier to file the form 
electronically.

II. Public Reporting Burden

    The Commission estimates the public reporting burden for the 
collection of information under the final rule will remain unchanged 
for Form No. 1, since the only modifications are to the instructions 
for the filing of the form to make them clearer and to make it easier 
to file the form electronically.

[[Page 49663]]

    The current annual reporting burden for the industry for the 
collection of information is estimated to be 235,000 hours. The 
industry burden is based on an estimate of 1,217 average hours on an 
annual basis for the 193 entities which complete a Form No. 1 filing. 
This estimate includes the time for reviewing instructions, researching 
existing data sources, gathering and maintaining the data needed, and 
completing and reviewing the collection of information.
    Comments regarding this burden estimate or any other aspect of this 
collection of information, including suggestions for reducing this 
burden can be sent to, the Federal Energy Regulatory Commission, 888 
First Street, N.E., Washington, D.C. 20426 (Attention: Michael Miller, 
Information Services Division, (202) 208-1415), and to the Office of 
Information and Regulatory Affairs of the Office of Management and 
Budget (Attention: Desk Officer for the Federal Energy Regulatory 
Commission); FAX: (202) 395-7285; telephone: (202) 395-3087.

III. Background

    The Commission, in the exercise of its authority under the Federal 
Power Act (FPA), collects data pertaining to the electric utility 
industry in the United States.3 One of the principal forms that 
the Commission uses to collect this information is Form No. 1, which 
some 193 electric utilities and licensees submit annually.4 Form 
No. 1 consists of cover pages, four pages of general information and 
instructions, and 113 pages of schedules incorporating financial and 
operational information pertaining to the respondent companies. An 
independent certified public accountant must certify that certain 
information on the form conforms to the Commission's Uniform System of 
Accounts.5
---------------------------------------------------------------------------

    \3\ 16 U.S.C. 825, 825c.
    \4\ Electronic Filing I, 60 FR at 1716-17; FERC Stats. & Regs. 
at 31,256.
    \5\ 18 CFR Part 101. See Electronic Filing I, 60 FR at 1717; 
FERC Stats. & Regs. at 31,256.
---------------------------------------------------------------------------

    The Commission has now gained experience from two reporting cycles 
under the new system. The Commission received numerous inquiries 
seeking clarification of certain of the instructions that were not 
compatible with the new electronic filing requirement. The Commission 
has determined that, in addition to clarifying these instructions, it 
also should revise certain others that have created ambiguity in prior 
reporting cycles.
    The Commission is making these revisions in the Form No. 1 
instructions in tandem with its continuing improvement of the Form No. 
1 software. These changes to the Form No. 1 instructions will make it 
easier to field test, and eventually distribute, a new version of the 
software to each Form No. 1 respondent. A detailed description of the 
changes that the Commission is making in its Form No. 1 instructions 
follows. A revised set of Form No. 1 instructions appears in the 
Appendix.6
---------------------------------------------------------------------------

    \6\ Note: This Appendix will not appear in the Code of Federal 
Regulations.
---------------------------------------------------------------------------

IV. Description of Changes to Form No. 1 Instructions

A. Overview of Instructions that the Commission is Modifying

------------------------------------------------------------------------
       Page No.                  Topic                Instruction No.   
------------------------------------------------------------------------
102..................  Control Over Respondent..  2                     
103..................  Corporations Controlled    4                     
                        By Respondent.                                  
104..................  Officers.................  3                     
108..................  Important Changes During   12                    
                        The Year.                                       
115..................  Statement Of Income For    7                     
                        The Year (Continued).                           
118..................  Statement of Retained      8                     
                        Earnings For The Year.                          
120..................  Statement Of Cash Flows..  1                     
122..................  Notes To Financial         6                     
                        Statements.                                     
261..................  Reconciliation Of          3                     
                        Reported Net Income With                        
                        Taxable Income For                              
                        Federal Income Taxes.                           
263..................  Taxes Accrued, Prepaid     8                     
                        And Charged During Year                         
                        (Continued).                                    
350-351..............  Regulatory Commission      2, 4 and column       
                        Expenses.                  headings (d), (e),   
                                                   (i), (l).            
------------------------------------------------------------------------

B. Description of and Reason for Changes

Page 102, Instruction No. 2

    1. Change: deleted.
    2. Reason: Inconsistent with requirement to file data in a 
structured electronic format. Instruction called for referencing 
information submitted to the Securities and Exchange Commission (SEC) 
(i.e. the SEC's 10-K annual report), rather than providing the 
information on a diskette.

Page 103, Instruction No. 4

    1. Change: deleted.
    2. Reason: Inconsistent with requirement to file data in a 
structured electronic format. Instruction called for referencing 
information submitted to the SEC (i.e., the SEC's 10-K annual report), 
rather than providing the information on a diskette.

Page 104, Instruction No. 3

    1. Change: deleted.
    2. Reason: Inconsistent with requirement to file data in a 
structured electronic format. Instruction called for substituting a 
copy of the information submitted to the SEC (i.e., item 4 of 
Regulation S-K), instead of completing page 104.

Page 108, Instruction No. 12

    1. Change: The Commission is changing the words ``attached to'' to 
``included on'' this page.
    2. Reason: The words ``attached to'' are inconsistent with the 
requirement to file data in a structured electronic format. Instruction 
provided for attaching a copy of the notes that appear in the 
respondent's annual report.

Page 115, Instruction No. 7

    1. Change: The Commission is changing the words ``attached at'' to 
``included on'' page 122.
    2. Reason: The words ``attached at'' are inconsistent with the 
requirement to file the data in a structured electronic format. 
Instruction called for attaching at page 122 a copy of the notes 
appearing in the report to stockholders.

Page 118, Instruction No. 8

    1. Change: The Commission is changing the words ``attach them at'' 
to ``include them on'' page 122.
    2. Reason: The words ``attach them at'' are inconsistent with the 
requirement to file the data in a structured electronic format. 
Instruction called for attaching at page 122 a copy of the notes 
appearing in the report to stockholders.

Page 120, Instruction No. 1

    1. Change: The Commission is changing the words ``attached to'' to 
``included on'' page 122.
    2. Reason: The words ``attached to'' are inconsistent with the 
requirement to file the data in a structured electronic format. 
Instruction called for attaching at page 122 a copy of the notes 
appearing in the annual stockholders report.

Page 122, Instruction No. 6

    1. Change: The Commission is changing the words ``attached hereto'' 
to ``included herein.''
    2. Reason: The words ``attached hereto'' are inconsistent with the

[[Page 49664]]

requirement to file the data in a structured electronic format. 
Instruction called for attaching a copy of the notes that appear in the 
respondent's annual report to stockholders.

Page 261, Instruction No. 3

    1. Change: The Commission is adding the following direction to this 
instruction: ``For electronic reporting purposes complete line 27 and 
provide the substitute page in the context of a footnote.''
    2. Reason: As currently written, the instruction is inconsistent 
with the requirement to file the data in a structured electronic 
format.

Page 263, Instruction No. 8

    1. Change: The Commission is deleting the current text of this 
instruction and is replacing that text with the following language: 
``Report in columns (i) through (l) how the taxes were distributed. 
Report in column (i) only the amounts charged to Accounts 408.1 and 
409.1 pertaining to electric operations. Report in column (l) the 
amounts charged to Accounts 408.1 and 409.1 pertaining to other utility 
departments and amounts charged to Accounts 408.2 and 409.2. Also show 
in column (l) the taxes charged to utility plant or other balance sheet 
accounts.''
    2. Reason: The current instruction is confusing.

Pages 350-351, Instructions Nos. 2 and 4, and Column Headings for (d), 
(e), (i) and (l)

    1. Change: The Commission is deleting the text of Instruction No. 2 
and replacing the text of that instruction with the following language: 
``Report in columns (b) and (c) only the current year's expenses that 
are not deferred and the current year's amortization of amounts 
deferred in previous years.''
    The Commission is also revising the related column (d) heading to 
read: ``Total Expenses for Current Year (b)+(c)''
    The Commission is deleting Instruction No. 4 and renumbering 
Instruction Nos. 5 and 6 as Nos. 4 and 5.
    Finally, the Commission is revising the references to Account 186 
that appear in the column headings for (e), (i) and (l) to read 
``Account 182.3''.
    2. Reason: Current Instruction No. 2 is confusing; current 
Instruction No. 4 is outdated; and, to effect the necessary changes, 
the Commission must renumber certain instructions and revise column 
headings accordingly.

V. Environmental Statement

    Commission regulations require that an environmental assessment or 
an environmental impact statement be prepared for any Commission action 
that may have a significant adverse effect on the human environment. 
7 The Commission has categorically excluded certain actions from 
this requirement as not having a significant effect on the human 
environment. 8 No environmental consideration is necessary for the 
promulgation of a rule that is clarifying, corrective or procedural. 
9 Because the changes in the Form No. 1 instructions that the 
Commission is making here are merely procedural and clarifying, and 
simply correct ambiguity in certain of the instructions, no 
environmental statement is necessary.
---------------------------------------------------------------------------

    \7\ Regulations Implementing the National Environmental Policy 
Act, Order No. 486, 52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs. 
Regulations Preambles 1986-1990 para. 30,783 (1987) (codified at 18 
CFR Part 380).
    \8\ 18 CFR 380.4.
    \9\ 18 CFR 380.4(a)(2)(ii).
---------------------------------------------------------------------------

VI. Regulatory Flexibility Act Certification

    The Regulatory Flexibility Act 10 requires rulemakings either 
to contain a description and analysis of the impact the rule will have 
on small entities or to certify that the rule will not have a 
substantial economic impact on a substantial number of small entities. 
Because most respondents do not fall within the definition of ``small 
entity,'' 11 the Commission certifies
---------------------------------------------------------------------------

    \10\ 5 U.S.C. 601-612.
    \11\ See 5 U.S.C. 601(3), citing to section 3 of the Small 
Business Act, 15 U.S.C. 632, which defines a ``small business 
concern'' as a business which is independently owned and operated 
and which is not dominant in its field of operation.
---------------------------------------------------------------------------

    that this rule will not have a significant economic impact on a 
substantial number of small entities.

VII. Information Collection Statement

    Office of Management and Budget (OMB) regulations require OMB to 
approve certain information collection requirements imposed by an 
agency 12. The information collection requirements in the final 
rule are contained in FERC Form No. 1.
---------------------------------------------------------------------------

    \12\ 5 CFR 1320.12.
---------------------------------------------------------------------------

    Title: FERC Form No. 1 ``Annual Report of Major Electric Utilities, 
Licensees and Others''.
    Action: Final Rule.
    OMB Control No.: 1902-0021 (Respondents shall not be penalized for 
failure to respond to this collection of information unless the 
collection of information displays a valid OMB control number).
    Respondents: Business or other for profit entities.
    Frequency of responses: Annually
    Necessity of the information: The Commission uses the data 
collected to carry out its regulatory responsibilities. The 
Commission's Office of Chief Accountant uses the data in its audit 
program and continuous review of the financial condition of regulated 
companies. The Office of Electric Power Regulation (OEPR) uses the data 
in rate and other proceedings, and the Offices of Hydroelectric 
Licensing (OHL), Economic Policy (OEP) and General Counsel (OGC) use 
the data in investigations and programs relating to the administration 
of the Federal Power Act (FPA).
    The FPA mandates the collection of data needed by the Commission to 
perform its regulatory responsibilities in, inter alia, the setting of 
just and reasonable rates. The Commission could be held in violation of 
the FPA if the data were not collected.
    The final rule will not change the reporting requirements of FERC 
Form No. 1. This rule therefore is not subject to OMB review. The 
Commission is submitting a copy of the proposed rule to OMB for 
information purposes only. Interested persons may obtain information on 
these reporting requirements by contacting the Federal Energy 
Regulatory Commission, 888 First Street, NE. Washington, DC. 20426 
[Attention: Michael Miller, Information Services Division, (202) 208-
1415]. Comments on the requirements of this rule can be sent to the 
Office of Information and Regulatory Affairs of OMB [Attention: Desk 
Officer for the Federal Energy Regulatory Commission]; FAX: (202) 395-
7285; telephone: (202) 395-3087.

VIII. Administrative Findings and Effective Date

    The Administrative Procedure Act (APA) 13 requires rulemakings 
to be published in the Federal Register. The APA also mandates that an 
opportunity for comments be provided when an agency promulgates 
regulations. However, notice and comment are not required under the APA 
when the agency for good cause finds that notice and public procedure 
thereon are impracticable, unnecessary or contrary to the public 
interest. 14
---------------------------------------------------------------------------

    \13\ 5 U.S.C. 551-559.
    \14\ 5 U.S.C. 553(B); e.g., Mid-Tex Electric Cooperative, Inc. 
v. FERC, 822 F.2d 1123 (D.C. Cir. 1987).
---------------------------------------------------------------------------

    The Commission finds that notice and comment are unnecessary for 
this rulemaking. As explained above, this

[[Page 49665]]

final rule is merely procedural, clarifying and ministerial in nature. 
The Commission is merely clarifying its Form No. 1 instructions and 
making them more compatible with the requirement of electronic filing. 
The Commission, therefore, finds good cause to make this rule effective 
October 23, 1996.

IX. Congressional Notification

    The Small Business Regulatory Enforcement Fairness Act of 1996 
requires agencies to report to Congress on the promulgation of certain 
final rules prior to their effective dates. 15 That reporting 
requirement does not apply to this final rule because it falls within a 
statutory exception for rules relating to procedural matters. 16
---------------------------------------------------------------------------

    \15\ 5 U.S.C. 801 (1994).
    \16\ 5 U.S.C. 804(3)(B) (1994).
---------------------------------------------------------------------------

List of Subjects

18 CFR Part 141

    Electric power; Reporting and recordkeeping requirements.

    By the Commission.
Lois D. Cashell,
Secretary.

    In consideration of the foregoing, the Commission amends the 
instructions for Form No. 1 as appear in the Appendix.

    Note: This Appendix will not be codified in the Code of Federal 
Regulations.

BILLING CODE 6717-01-P

[[Page 49666]]

APPENDIX
[GRAPHIC] [TIFF OMITTED] TR23SE96.000

[[Page 49667]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.001

[[Page 49668]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.002

[[Page 49669]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.003

[[Page 49670]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.004

[[Page 49671]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.005

[[Page 49672]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.006

[[Page 49673]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.007

[[Page 49674]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.008

[[Page 49675]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.009

[[Page 49676]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.010

[[Page 49677]]

[GRAPHIC] [TIFF OMITTED] TR23SE96.011

[[Page 49678]]

[FR Doc. 96-24261 Filed 9-20-96; 8:45 am]
BILLING CODE 6717-01-P

Complete official Federal Register PDF

FR Doc. 96-24240 Oranges and Grapefruit Grown in the Lower Rio Grande Valley in Texas; Assessment Rate
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49650-49651]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24240]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 906

[Docket No. FV96-906-1 FIR]

Oranges and Grapefruit Grown in the Lower Rio Grande Valley in 
Texas; Assessment Rate

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (Department) is adopting as a 
final rule, without change, the provisions of an interim final rule 
establishing an assessment rate for the Texas Valley Citrus Committee 
(Committee) under Marketing Order No. 906 for the 1996-97 and 
subsequent fiscal periods. The Committee is responsible for local 
administration of the marketing order which regulates the handling of 
oranges and grapefruit grown in the Lower Rio Grande Valley in Texas. 
Authorization to assess orange and grapefruit handlers enables the 
Committee to incur expenses that are reasonable and necessary to 
administer the program.

EFFECTIVE DATE: August 1, 1996.

FOR FURTHER INFORMATION CONTACT: Belinda G. Garza, McAllen Marketing 
Field Office, Fruit and Vegetable Division, AMS, USDA, 1313 E. 
Hackberry, McAllen, TX 78501, telephone (210) 682-2833, FAX # (210) 
682-5942, or Charles L. Rush, Marketing Order Administration Branch, 
Fruit and Vegetable Division, AMS, USDA, P.O. Box 96456, room 2523-S, 
Washington, DC 20090-6456, telephone (202) 690-3670, FAX # (202) 720-
5698.
    Small businesses may request information on compliance with this 
regulation by contacting: Jay Guerber, Marketing Order Administration 
Branch, Fruit and Vegetable Division, AMS, USDA, P.O. Box 96456, room 
2523-S, Washington, DC 20090-6456; telephone (202) 720-2491; FAX # 
(202) 720-5698.

SUPPLEMENTARY INFORMATION: This rule is issued under Marketing 
Agreement and Order No. 906 (7 CFR part 906), regulating the handling 
of oranges and grapefruit grown in the Lower Rio Grande Valley in 
Texas, hereinafter referred to as the ``order.'' The marketing 
agreement and order are effective under the Agricultural Marketing 
Agreement Act of 1937, as amended (7 U.S.C. 601-674), hereinafter 
referred to as the ``Act.''
    The Department is issuing this rule in conformance with Executive 
Order 12866.
    This rule has been reviewed under Executive Order 12988, Civil 
Justice Reform. Under the marketing order now in effect, handlers of 
oranges and grapefruit grown in the Lower Rio Grande Valley in Texas 
are subject to assessments. Funds to administer the order are derived 
from such assessments. It is intended that the assessment rate as 
issued herein will be applicable to all assessable oranges and 
grapefruit beginning August 1, 1996, and continuing until amended, 
suspended, or terminated. This rule will not preempt any State or local 
laws, regulations, or policies, unless they present an irreconcilable 
conflict with this rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and request a modification of the order or to be exempted 
therefrom. Such handler is afforded the opportunity for a hearing on 
the petition. After the hearing the Secretary would rule on the 
petition. The Act provides that the district court of the United States 
in any district in which the handler is an inhabitant, or has his or 
her principal place of business, has jurisdiction to review the 
Secretary's ruling on the petition, provided an action is filed not 
later than 20 days after the date of the entry of the ruling.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this rule on small entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and the rules issued thereunder, are unique in 
that they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are approximately 2,000 producers of oranges and grapefruit 
in the production area and 19 handlers subject to regulation under the 
marketing order. Small agricultural producers have been defined by the 
Small Business Administration (13 CFR 121.601) as those having annual 
receipts less than $500,000, and small agricultural service firms are 
defined as those whose annual receipts are less than $5,000,000. The 
majority of orange and grapefruit producers and handlers may be 
classified as small entities.
    The Texas orange and grapefruit marketing order provides authority 
for the Committee, with the approval of the Department, to formulate an 
annual budget of expenses and collect assessments from handlers to 
administer the program. The members of the Committee are producers and 
handlers of Texas oranges and grapefruit. They are familiar with the 
Committee's needs and with the costs for goods and services in their 
local area and are thus in a position to formulate an appropriate 
budget and assessment rate. The assessment rate is formulated and 
discussed in a public meeting. Thus, all directly affected persons have 
an opportunity to participate and provide input.
    The Committee met on May 29, 1996, and recommended 1996-97 
expenditures of $1,085,130 and an assessment rate of $0.125 per \7/10\ 
bushel carton of oranges and grapefruit. In comparison, last year's 
budgeted expenditures were $1,008,643. The assessment rate of $0.125 is 
$0.025 higher than last year's established rate. Major expenditures 
recommended by the Committee for the 1996-97 fiscal year include 
$712,800 for advertising and $174,000 for the Mexican Fruit Fly support 
program. Budgeted expenses for these items in 1995-96 were $500,000 for 
advertising and $174,000 for the Mexican Fruit Fly support program.
    The assessment rate recommended by the Committee was derived by 
dividing anticipated expenses by expected shipments of Texas oranges 
and grapefruit. Texas orange and grapefruit shipments for the year are 
estimated at 8 million cartons which should provide $1,000,000 in 
assessment income. Income derived from handler assessments, along with 
interest income

[[Page 49651]]

and funds from the Committee's authorized reserve, will be adequate to 
cover budgeted expenses. Funds in the reserve will be kept within the 
maximum permitted by the order.
    An interim final rule regarding this action was published in the 
July 22, 1996, issue of the Federal Register (61 FR 37810). That rule 
provided for a 30-day comment period. No comments were received.
    While this rule will impose some additional costs on handlers, the 
costs are in the form of uniform assessments on all handlers. Some of 
the additional costs may be passed on to producers. However, these 
costs will be offset by the benefits derived by the operation of the 
marketing order. Therefore, the AMS has determined that this rule will 
not have a significant economic impact on a substantial number of small 
entities.
    The assessment rate established in this rule will continue in 
effect indefinitely unless modified, suspended, or terminated by the 
Secretary upon recommendation and information submitted by the 
Committee or other available information.
    Although this assessment rate is effective for an indefinite 
period, the Committee will continue to meet prior to or during each 
fiscal period to recommend a budget of expenses and consider 
recommendations for modification of the assessment rate. The dates and 
times of Committee meetings are available from the Committee or the 
Department. Committee meetings are open to the public and interested 
persons may express their views at these meetings. The Department will 
evaluate Committee recommendations and other available information to 
determine whether modification of the assessment rate is needed. The 
Committee's 1996-97 budget and those for subsequent fiscal periods will 
be reviewed and, as appropriate, approved by the Department.
    After consideration of all relevant material presented, including 
the information and recommendation submitted by the Committee and other 
available information, it is hereby found that this rule, as 
hereinafter set forth, will tend to effectuate the declared policy of 
the Act.
    Pursuant to 5 U.S.C. 553, it is also found and determined that good 
cause exists for not postponing the effective date of this rule until 
30 days after publication in the Federal Register because: (1) The 
Committee needs to have sufficient funds to pay its expenses which are 
incurred on a continuous basis; (2) the 1996-97 fiscal period began on 
August 1, 1996, and the marketing order requires that the rate of 
assessment for each fiscal period apply to all assessable oranges and 
grapefruit handled during such fiscal period; (3) handlers are aware of 
this action which was recommended by the Committee at a public meeting 
and is similar to other assessment rate actions issued in past years; 
and (4) an interim final rule was published on this action, providing a 
30-day comment period, and no comments were received.

List of Subjects in 7 CFR Part 906

    Marketing agreements, Grapefruit, Oranges, Reporting and 
recordkeeping requirements.

PART 906--ORANGES AND GRAPEFRUIT GROWN IN THE LOWER RIO GRANDE 
VALLEY IN TEXAS

    Accordingly, the interim final rule amending 7 CFR part 906 which 
was published at 61 FR 37810 on July 22, 1996, is adopted as a final 
rule without change.

    Dated: September 17, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-24240 Filed 9-20-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-24239 Nectarines and Fresh Peaches Grown in California; Assessment Rates
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49651-49653]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24239]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
7 CFR Parts 916 and 917

[Docket No. FV96-916-1 FIR]

Nectarines and Fresh Peaches Grown in California; Assessment 
Rates

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (Department) is adopting as a 
final rule, without change, the provisions of an interim final rule 
establishing assessment rates for the Nectarine Administrative 
Committee and the Peach Commodity Committee (Committees) under 
Marketing Order Nos. 916 and 917 for the 1996-97 and subsequent fiscal 
periods. The Committees are responsible for local administration of the 
marketing orders which regulate the handling of nectarines and fresh 
peaches grown in California. Authorization to assess nectarine and 
fresh peach handlers enables the Committees to incur expenses that are 
reasonable and necessary to administer the programs.

EFFECTIVE DATE: March 1, 1996.

FOR FURTHER INFORMATION CONTACT: Mary Kate Nelson, Marketing Assistant, 
California Marketing Field Office, Fruit and Vegetable Division, AMS, 
USDA, 2202 Monterey Street, suite 102B, Fresno, California 93721, (209) 
487-5901, FAX (209) 487-5906, or Kenneth G. Johnson, Marketing 
Specialist, Marketing Order Administration Branch, Fruit and Vegetable 
Division, AMS, USDA, P.O. Box 96456, room 2523-S, Washington, DC 20090-
6456, telephone (202) 720-5127, FAX (202) 720-5698. Small businesses 
may request information on compliance with this regulation by 
contacting: Jay Guerber, Marketing Order Administration Branch, Fruit 
and Vegetable Division, AMS, USDA, P.O. Box 96456, room 2523-S, 
Washington, D.C. 20090-6456; telephone: (202) 720-2491, FAX (202) 720-
5698.

SUPPLEMENTARY INFORMATION: This rule is issued under Marketing 
Agreement No. 916 and Order No. 916, both as amended (7 CFR part 916), 
regulating the handling of nectarines grown in California, and 
Marketing Agreement No. 917 and Order No. 917, both as amended (7 CFR 
part 917), regulating the handling of fresh peaches grown in 
California, hereinafter referred to as the ``orders.'' The marketing 
agreements and orders are effective under the Agricultural Marketing 
Agreement Act of 1937, as amended (7 U.S.C. 601-674), hereinafter 
referred to as the ``Act.''
    The Department is issuing this rule in conformance with Executive 
Order 12866.
    This rule has been reviewed under Executive Order 12988, Civil 
Justice Reform. Under the marketing orders now in effect, California 
nectarine and fresh peach handlers are subject to assessments. Funds to 
administer the orders are derived from such assessments. It is intended 
that the assessment rates as issued herein will be applicable to all 
assessable nectarines and peaches beginning March 1, 1996, and 
continuing until amended, suspended, or terminated. This rule will not 
preempt any State or local laws, regulations, or policies, unless they 
present an irreconcilable conflict with this rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and request a modification of the order or to be exempted 
therefrom. Such handler is afforded the opportunity for a hearing on 
the petition. After the hearing the Secretary would rule on the 
petition. The Act provides that the district court of the United States 
in any

[[Page 49652]]

district in which the handler is an inhabitant, or has his or her 
principal place of business, has jurisdiction to review the Secretary's 
ruling on the petition, provided an action is filed not later than 20 
days after the date of the entry of the ruling.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this rule on small entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and the rules issued thereunder, are unique in 
that they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are approximately 1,800 producers of nectarines and peaches 
in the production area and approximately 300 handlers subject to 
regulation under the marketing orders. Small agricultural producers 
have been defined by the Small Business Administration (13 CFR 121.601) 
as those having annual receipts less than $500,000, and small 
agricultural service firms are defined as those whose annual receipts 
are less than $5,000,000. The majority of nectarine and fresh peach 
producers and handlers may be classified as small entities.
    The nectarine and peach marketing orders provide authority for the 
Committees, with the approval of the Department, to formulate annual 
budgets of expenses and collect assessments from handlers to administer 
the programs. The members of the Committees are producers and handlers 
of California nectarines and fresh peaches. They are familiar with the 
Committees' needs and with the costs for goods and services in their 
local area and are thus in a position to formulate appropriate budgets 
and assessment rates. The assessment rates are formulated and discussed 
in public meetings. Thus, all directly affected persons have an 
opportunity to participate and provide input.
    The Nectarine Administrative Committee met on May 2, 1996, and 
unanimously recommended 1996-97 expenditures of $3,682,728 and an 
assessment rate of $0.1850 per 25-pound container or equivalent of 
nectarines. In comparison, last year's budgeted expenditures were 
$3,683,031. The assessment rate of $0.1850 is the same as last year's 
established rate. Major expenditures recommended by the Committee for 
the 1996-97 year include $1,326,376 for domestic market development, 
$972,300 for inspection, $342,250 in salaries and benefits, and 
$120,870 for research. Budgeted expenses for these items in 1995-96 
were $1,534,593, $855,000, $340,025, and $99,117 respectively.
    The Peach Commodity Committee met on May 1, 1996, and unanimously 
recommended 1996-97 expenditures of $3,722,757 and an assessment rate 
of $0.1900 per 25-pound container or equivalent of fresh peaches. In 
comparison, last year's budgeted expenditures were $3,736,531. The 
assessment rate of $0.1900 is the same as last year's established rate. 
Major expenditures recommended by the Committee for the 1996-97 year 
include $1,326,376 for domestic market development, $991,500 for 
inspection, $342,250 in salaries and benefits, and $120,870 for 
research. Budgeted expenses for these items in 1995-96 were $1,534,593, 
$900,000, $340,025, and $99,117 respectively.
    The assessment rates recommended by the Committees were derived by 
dividing anticipated expenses by expected shipments of California 
nectarines and fresh peaches. Nectarine shipments for the year are 
estimated at 17,266,000 25-pound containers or equivalent which should 
provide $3,194,210 in assessment income, and fresh peach shipments for 
the year are estimated at 17,250,000 25-pound containers or equivalent 
which should provide $3,277,500 in assessment income. Income derived 
from handler assessments, the Plum Commodity Committee, and the Pear 
Field Service, along with interest income and funds from the 
Committees' authorized reserves, will be adequate to cover budgeted 
expenses. Funds in the reserves will be kept within the maximum 
permitted by the orders.
    An interim final rule regarding this action was published in the 
July 22, 1996, issue of the Federal Register (61 FR 37812). That rule 
provided for a 30-day comment period. Two comments were received, both 
in support of the assessment rates as published.
    While this rule will impose some additional costs on handlers, the 
costs are in the form of uniform assessments on all handlers. Some of 
the additional costs may be passed on to producers. However, these 
costs will be offset by the benefits derived by the operation of the 
marketing orders.
    Therefore, the AMS has determined that this rule will not have a 
significant economic impact on a substantial number of small entities.
    The assessment rates established in this rule will continue in 
effect indefinitely unless modified, suspended, or terminated by the 
Secretary upon recommendation and information submitted by the 
Committees or other available information.
    Although these assessment rates are effective for an indefinite 
period, the Committees will continue to meet prior to or during each 
fiscal period to recommend budgets of expenses and consider 
recommendations for modification of their assessment rates. The dates 
and times of Committee meetings are available from the Committees or 
the Department. Committee meetings are open to the public and 
interested persons may express their views at these meetings. The 
Department will evaluate the Committees' recommendations and other 
available information to determine whether modification of the 
assessment rates are needed. The Committees' 1996-97 budgets and those 
for subsequent fiscal periods will be reviewed and, as appropriate, 
approved by the Department.
    After consideration of all relevant material presented, including 
the information and recommendations submitted by the Committees and 
other available information, it is hereby found that this rule, as 
hereinafter set forth, will tend to effectuate the declared policy of 
the Act.
    Pursuant to 5 U.S.C. 553, it is also found and determined that good 
cause exists for not postponing the effective date of this rule until 
30 days after publication in the Federal Register because: (1) The 
Committees need to have sufficient funds to pay their expenses which 
are incurred on a continuous basis; (2) the 1996-97 fiscal periods 
began on March 1, 1996, and the marketing orders require that the rates 
of assessment for each fiscal period apply to all assessable nectarines 
and peaches handled during such fiscal period; (3) handlers are aware 
of this action which was unanimously recommended by the Committees at 
public meetings and is similar to other assessment rate actions issued 
in past years; and (4) an interim final rule was published on this 
action and provided for a 30-day comment period. Two comments were 
received, both in support of the assessment rates as published.

[[Page 49653]]

List of Subjects

7 CFR Part 916

    Nectarines, Marketing agreements, Reporting and recordkeeping 
requirements.

7 CFR Part 917

    Peaches, Pears, Marketing agreements, Reporting and recordkeeping 
requirements.

PART 916--NECTARINES GROWN IN CALIFORNIA

PART 917--FRESH PEARS AND PEACHES GROWN IN CALIFORNIA

    Accordingly, the interim final rule amending 7 CFR parts 916 and 
917 which was published at 61 FR 37812 on July 22, 1996, is adopted as 
a final rule.

    Dated: September 16, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-24239 Filed 9-20-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-24237 Kiwifruit Grown in California; Assessment Rate
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49653-49654]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24237]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
7 CFR Part 920

[Docket No. FV96-920-1 FIR]

Kiwifruit Grown in California; Assessment Rate

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Department of Agriculture (Department) is adopting as a 
final rule, without change, the provisions of an interim final rule 
establishing an assessment rate for the Kiwifruit Administrative 
Committee (Committee) under Marketing Order No. 920 for the 1996-97 and 
subsequent fiscal periods. The Committee is responsible for local 
administration of the marketing order which regulates the handling of 
kiwifruit grown in California. Authorization to assess kiwifruit 
handlers enables the Committee to incur expenses that are reasonable 
and necessary to administer the program.

EFFECTIVE DATE: August 1, 1996.

FOR FURTHER INFORMATION CONTACT: Mary Kate Nelson, Marketing Assistant, 
California Marketing Field Office, Fruit and Vegetable Division, AMS, 
USDA, 2202 Monterey Street, suite 102B, Fresno, California 93721, 
telephone (209) 487-5901, FAX# (209) 487-5906, or Charles L. Rush, 
Marketing Specialist, Marketing Order Administration Branch, Fruit and 
Vegetable Division, AMS, USDA, P.O. Box 96456, room 2523-S, Washington, 
DC 20090-6456, telephone (202) 720-5127, FAX# (202) 720-5698. Small 
businesses may request information on compliance with this regulation 
by contacting: Jay Guerber, Marketing Order Administration Branch, 
Fruit and Vegetable Division, AMS, USDA, P.O. Box 96456, room 2523-S, 
Washington, DC 20090-6456, telephone (202) 720-2491, FAX# (202) 720-
5698.

SUPPLEMENTARY INFORMATION: This rule is issued under Marketing Order 
No. 920, as amended (7 CFR part 920), regulating the handling of 
kiwifruit grown in California, hereinafter referred to as the 
``order.'' The marketing order is effective under the Agricultural 
Marketing Agreement Act of 1937, as amended (7 U.S.C. 601-674), 
hereinafter referred to as the ``Act.''
    The Department is issuing this rule in conformance with Executive 
Order 12866.
    This rule has been reviewed under Executive Order 12988, Civil 
Justice Reform. Under the marketing order now in effect, California 
kiwifruit handlers are subject to assessments. Funds to administer the 
order are derived from such assessments. It is intended that the 
assessment rate as issued herein will be applicable to all assessable 
kiwifruit beginning August 1, 1996, and continuing until amended, 
suspended, or terminated. This rule will not preempt any State or local 
laws, regulations, or policies, unless they present an irreconcilable 
conflict with this rule.
    The Act provides that administrative proceedings must be exhausted 
before parties may file suit in court. Under section 608c(15)(A) of the 
Act, any handler subject to an order may file with the Secretary a 
petition stating that the order, any provision of the order, or any 
obligation imposed in connection with the order is not in accordance 
with law and request a modification of the order or to be exempted 
therefrom. Such handler is afforded the opportunity for a hearing on 
the petition. After the hearing the Secretary would rule on the 
petition. The Act provides that the district court of the United States 
in any district in which the handler is an inhabitant, or has his or 
her principal place of business, has jurisdiction to review the 
Secretary's ruling on the petition, provided an action is filed not 
later than 20 days after the date of the entry of the ruling.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this rule on small entities.
    The purpose of the RFA is to fit regulatory actions to the scale of 
business subject to such actions in order that small businesses will 
not be unduly or disproportionately burdened. Marketing orders issued 
pursuant to the Act, and the rules issued thereunder, are unique in 
that they are brought about through group action of essentially small 
entities acting on their own behalf. Thus, both statutes have small 
entity orientation and compatibility.
    There are approximately 500 producers of kiwifruit in the 
production area and approximately 65 handlers subject to regulation 
under the marketing order. Small agricultural producers have been 
defined by the Small Business Administration (13 CFR 121.601) as those 
having annual receipts less than $500,000, and small agricultural 
service firms are defined as those whose annual receipts are less than 
$5,000,000. The majority of kiwifruit producers and handlers may be 
classified as small entities.
    The kiwifruit marketing order provides authority for the Committee, 
with the approval of the Department, to formulate an annual budget of 
expenses and collect assessments from handlers to administer the 
program. The members of the Committee are producers of California 
kiwifruit and one non-industry member. They are familiar with the 
Committee's needs and with the costs for goods and services in their 
local area and are thus in a position to formulate an appropriate 
budget and assessment rate. The assessment rate is formulated and 
discussed in a public meeting. Thus, all directly affected persons have 
an opportunity to participate and provide input.
    The Committee met on June 12, 1996, and unanimously recommended 
1996-97 expenditures of $178,598 and an assessment rate of $0.0175 per 
tray or tray equivalent of kiwifruit. In comparison, last year's 
budgeted expenditures were $172,683. The assessment rate of $0.0175 per 
tray or tray equivalent is $0.0025 higher than last year's established 
rate. Major expenditures recommended by the Committee for the 1996-97 
year include $108,500 for administrative staff and field salaries, 
$20,398 for travel, food and lodging and $13,000 for accident and 
health insurance. Budgeted expenses for these items in 1995-96 were 
$102,850, $19,798 and $13,050, respectively.
    In the interim final rule, an expense of $650 for management/staff 
food & lodging, was inadvertently omitted. This would modify the total 
amount for travel, food and lodging to be $20,398.
    The assessment rate recommended by the Committee was derived by 
dividing

[[Page 49654]]

anticipated expenses by expected shipments of California kiwifruit. 
Kiwifruit shipments for the year are estimated at 10.5 million trays or 
tray equivalents of kiwifruit which should provide $183,750 in 
assessment income. Income derived from handler assessments, along with 
interest income and funds from the Committee's authorized reserve, will 
be adequate to cover budgeted expenses. Funds in the reserve will be 
kept within the maximum permitted by the order.
    An interim final rule regarding this action was published in the 
August 5, 1996, issue of the Federal Register (61 FR 40506). That rule 
provided for a 30-day comment period. No comments were received.
    While this rule will impose some additional costs on handlers, the 
costs are in the form of uniform assessments on all handlers. Some of 
the additional costs may be passed on to producers. However, these 
costs will be offset by the benefits derived by the operation of the 
marketing order. Therefore, the AMS has determined that this rule will 
not have a significant economic impact on a substantial number of small 
entities.
    The assessment rate established in this rule will continue in 
effect indefinitely unless modified, suspended, or terminated by the 
Secretary upon recommendation and information submitted by the 
Committee or other available information.
    Although this assessment rate is effective for an indefinite 
period, the Committee will continue to meet prior to or during each 
fiscal period to recommend a budget of expenses and consider 
recommendations for modification of the assessment rate. The dates and 
times of Committee meetings are available from the Committee or the 
Department. Committee meetings are open to the public and interested 
persons may express their views at these meetings. The Department will 
evaluate Committee recommendations and other available information to 
determine whether modification of the assessment rate is needed. The 
Committee's 1996-97 budget and those for subsequent fiscal periods will 
be reviewed and, as appropriate, approved by the Department.
    After consideration of all relevant material presented, including 
the information and recommendation submitted by the Committee and other 
available information, it is hereby found that this rule, as 
hereinafter set forth, will tend to effectuate the declared policy of 
the Act.
    Pursuant to 5 U.S.C. 553, it is also found and determined that good 
cause exists for not postponing the effective date of this rule until 
30 days after publication in the Federal Register because: (1) The 
Committee needs to have sufficient funds to pay its expenses which are 
incurred on a continuous basis; (2) the 1996-97 fiscal period began on 
August 1, 1996, and the marketing order requires that the rate of 
assessment for each fiscal period apply to all assessable kiwifruit 
handled during such fiscal period; (3) handlers are aware of this 
action which was unanimously recommended by the Committee at a public 
meeting and is similar to other assessment rate actions issued in past 
years; and (4) an interim final rule was published on this action, 
providing a 30-day comment period, and no comments were received.

List of Subjects in 7 CFR Part 920

    Kiwifruit, Marketing agreements, Reporting and recordkeeping 
requirements.

PART 920--KIWIFRUIT GROWN IN CALIFORNIA

    Accordingly, the interim final rule amending 7 CFR part 920 which 
was published at 61 FR 40506 on August 5, 1996, is adopted as a final 
rule without change.

    Dated: September 17, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-24237 Filed 9-20-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-24199 National Oil and Hazardous Substances Contingency Plan; National Priorities List Update
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Page 49690]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24199]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300

[FRL-5612-8]

National Oil and Hazardous Substances Contingency Plan; National 
Priorities List Update

AGENCY: Environmental Protection Agency.

ACTION: Notice of deletion of Bonneville Power Administration Ross 
Complex (USDOE) from the National Priorities List.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) announces the 
deletion of the United States Department of Energy (USDOE) Bonneville 
Power Administration Ross Complex, located in Clark County, Vancouver, 
Washington, from the National Priorities List (NPL). The NPL is 
Appendix B of 40 CFR part 300 which is the National Oil and Hazardous 
Substances Contingency Plan (NCP), which EPA promulgated pursuant to 
Section 105 of the Comprehensive Environmental Response, Compensation, 
and Liability Act of 1980 (CERCLA), as amended. EPA and the State of 
Washington's Department of Ecology have determined that the Site poses 
no significant threat to public health or the environment and 
therefore, no further remedial measures pursuant to CERCLA are 
appropriate.

EFFECTIVE DATE: September 23, 1996.

FOR FURTHER INFORMATION CONTACT: Nancy Harney, Site Manager, U.S. 
Environmental Protection Agency, Region 10, 1200 6th Avenue (ECL-111), 
Seattle, Washington 98101, (206)-553-6635.

SUPPLEMENTARY INFORMATION: The site to be deleted from the NPL is: 
Bonneville Power Administration Ross Complex (USDOE), Clark County, 
Vancouver, Washington.
    A Notice of Intent to Delete for this site was published July 18, 
1996 (FRL-5537-8). The closing date for comments on the Notice of 
Intent to Delete was August 19, 1996. EPA received no comments.
    EPA identifies sites which appear to present a significant risk to 
public health, welfare, or the environment and it maintains the NPL as 
the list of those sites. Any site deleted from the NPL remains eligible 
for remedial actions in the unlikely event that conditions at the site 
warrant such action in the future. NCP Sec. 300.425(e)(3). Deletion of 
a site from the NPL does not affect responsible party liability or 
impede agency efforts to recover costs associated with response 
efforts.

List of Subjects in 40 CFR Part 300

    Environmental protection, Air pollution control. Chemicals, 
Hazardous substances, Hazardous waste, Intergovernmental relations, 
Penalties, Reporting and recordkeeping requirements, Superfund, Water 
pollution control, Water supply.

    Dated: September 10, 1996.
Chuck Clarke,
Regional Administrator, Region 10.

    For the reasons set out in the preamble, 40 CFR part 300 is amended 
as follows:

PART 300--[AMENDED]

    1. The authority citation for part 300 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 
12777, 56 FR 54757, 3 CFR 1991 Comp., p. 351; E.O. 12580, 52 FR 
2923, 3 CFR 1987 Comp., p. 193.

Appendix B--[Amended]

    2. Table 2 of Appendix B to part 300 is amended by removing the 
site for Bonneville Power Administration Ross (USDOE), Vancouver, 
Washington.

[FR Doc. 96-24199 Filed 9-20-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-24156 Prevailing Rate Systems; Abolishment of Norfolk, MA, Nonappropriated Fund Wage Area
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49649-49650]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24156]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 185 / Monday, September 23, 1996 / 
Rules and Regulations

[[Page 49649]]

OFFICE OF PERSONNEL MANAGEMENT

5 CFR Part 532

RIN 3206-AH58

Prevailing Rate Systems; Abolishment of Norfolk, MA, 
Nonappropriated Fund Wage Area

AGENCY: Office of Personnel Management.

ACTION: Interim rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: The Office of Personnel Management (OPM) is issuing interim 
regulations to abolish the Norfolk, MA, nonappropriated fund (NAF) 
Federal Wage System (FWS) wage area and redefine its five counties as 
areas of application to nearby NAF wage areas for pay-setting purposes. 
No permanent employee's wage rate will be reduced as a result of this 
change.

DATES: This interim rule becomes effective on September 23, 1996. 
Comments must be received by October 23, 1996. Employees currently paid 
rates from the Norfolk, MA, NAF wage schedule will continue to be paid 
from that schedule until their conversion to the schedules of the wage 
areas to which their counties of employment are being redefined by this 
rule on November 15, 1996, one day prior to the next adjustment of the 
Middlesex, MA, NAF schedule.

ADDRESSES: Send or deliver comments to Donald J. Winstead, Assistant 
Director for Compensation Policy, Human Resources Systems Service, 
Office of Personnel Management, Room 6H31, 1900 E Street NW., 
Washington, DC 20415, or FAX: (202) 606-0824.

FOR FURTHER INFORMATION CONTACT:
Frank Derby, (202) 606-2848.

SUPPLEMENTARY INFORMATION: The Department of Defense recommended to OPM 
that the Norfolk, MA, NAF FWS wage area be abolished and that the five 
counties having continuing FWS employment be redefined as areas of 
application to nearby NAF wage areas. Norfolk County, Plymouth County, 
and Suffolk County, MA, are being redefined to the Middlesex, MA, wage 
area. Barnstable County and Nantucket County, MA, are being redefined 
to the Newport, RI, wage area. This change is necessary because the 
pending closure of Naval Air Station, South Weymouth, MA, leaves the 
Norfolk, MA, NAF wage area without an activity having the capability to 
conduct a wage survey.
    As required in regulation, 5 CFR 532.219, the following criteria 
were considered in redefining these wage areas:
    (1) Proximity of largest activity in each county;
    (2) Transportation facilities and commuting patterns; and
    (3) Similarities of the counties in:
    (i) Overall population;
    (ii) Private employment in major industry categories; and
    (iii) Kinds and sizes of private industrial establishments.
    All regulatory factors favor redefinition of Norfolk County and 
Suffolk County to the adjacent Middlesex, MA, NAF wage area.
    For Plymouth County, proximity slightly favors (10 kilometers or 6 
miles) Newport, RI; however, the remaining regulatory factors--i.e., 
commuting patterns and overall population and industrial patterns--both 
favor Middlesex, MA.
    Commuting patterns for Barnstable County and Nantucket County 
slightly favor Middlesex, MA, but proximity and overall population and 
industrial patterns both favor Newport, RI.
    The Federal Prevailing Rate Advisory Committee reviewed this 
recommendation and by consensus recommended approval.

Waiver of Notice of Proposed Rulemaking and Delay in Effective Date

    Pursuant to 5 U.S.C. 553(b)(3)(B), I find that good cause exists 
for waiving the general notice of proposed rulemaking. Also, pursuant 
to section 553(d)(3) of title 5, United States Code, I find that good 
cause exists for making this rule effective in less than 30 days 
because the next Norfolk, MA, NAF wage survey would otherwise be 
required to begin in September 1996.

Regulatory Flexibility Act

    I certify that these regulations will not have a significant 
economic impact on a substantial number of small entities because they 
affect only Federal agencies and employees.

List of Subjects in 5 CFR Part 532

    Administrative practice and procedure, Freedom of information, 
Government employees, Reporting and recordkeeping requirements, Wages.

Office of Personnel Management.
Lorraine A. Green,
Deputy Director.

    Accordingly, OPM is amending 5 CFR part 532 as follows:

PART 532--PREVAILING RATE SYSTEMS

    1. The authority citation for part 532 continues to read as 
follows:

    Authority: 5 U.S.C. 5343, 5346; Sec. 532.707 also issued under 5 
U.S.C. 552.

Appendix B to Subpart B of Part 532--[Amended]

    2. In appendix B to subpart B, the listing for the State of 
Massachusetts is amended by removing the entry for Norfolk.
    3. Appendix D to subpart B is amended by removing the wage area 
list for Norfolk, Massachusetts, and by revising the lists for 
Middlesex, Massachusetts, and Newport, Rhode Island, to read as 
follows:

Appendix D to Subpart B of Part 532--Nonappropriated Fund Wage and 
Survey Areas

* * * * *

Massachusetts

Middlesex

Survey Area

Massachusetts:
    Middlesex

    Area of application. Survey area plus:

Massachusetts:
    Norfolk
    Plymouth
    Suffolk
New Hampshire:
    Hillsborough
* * * * *

Rhode Island

* * * * *

[[Page 49650]]

Newport

Survey Area

Rhode Island:
    Newport

    Area of application. Survey area plus:

Massachusetts:
    Barnstable
    Nantucket
Rhode Island:
    Providence
    Washington
* * * * *
[FR Doc. 96-24156 Filed 9-20-96; 8:45 am]
BILLING CODE 6325-01-M

Complete official Federal Register PDF

FR Doc. 96-24053 Clean Air Act Approval and Promulgation of State Implementation Plan for Colorado; Denver Nonattainment Area PMINF10 Contingency Measures
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49682-49684]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24053]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[CO-001-0001a; FRL-5606-4]

Clean Air Act Approval and Promulgation of State Implementation 
Plan for Colorado; Denver Nonattainment Area PM10 Contingency 
Measures

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: EPA approves the state implementation plan (SIP) revision 
submitted by the State of Colorado on November 17, 1995, to satisfy the 
Federal Clean Air Act requirement to submit contingency measures for 
the Denver moderate PM10 (particulate matter with an aerodynamic 
diameter less than or equal to a nominal 10 micrometers) nonattainment 
area. EPA is approving this SIP revision because it is consistent with 
the PM10 contingency measure requirements of the Clean Air Act, as 
amended (Act).

DATES: This action is effective on December 23, 1996 unless adverse 
comments are received by November 22, 1996. If the effective date is 
delayed, timely notice will be published in the Federal Register.

ADDRESSES: Comments should be addressed to Richard R. Long, Director 
Air Program, EPA Region VIII, at the address listed below. Copies of 
the State's submittal and other information are available for 
inspection during normal business hours at the following locations: Air 
Program, Environmental Protection Agency, Region VIII, 999 18th Street, 
Suite 500, Denver, Colorado 80202-2466; and Colorado Department of 
Public Health and Environment Air Pollution Control Division, 4300 
Cherry Creek Dr. South, Denver, Colorado 80222-1530. The information 
may be inspected between 8 a.m. and 4 p.m., on weekdays, except for 
legal holidays. A reasonable fee may be charged for copying.

FOR FURTHER INFORMATION CONTACT: Callie Videtich, 8P2-A, U.S. 
Environmental Protection Agency, Region VIII, 999 18th Street, Suite 
500, Denver, Colorado 80202-2466, (303) 312-6434.

SUPPLEMENTARY INFORMATION:

I. Background of Denver PM10 SIP

    The Denver, Colorado area was designated nonattainment for 
PM10 and classified as moderate under sections 107(d)(4)(B) and 
188(a) of the Act, upon enactment of the Clean Air Act Amendments of 
1990. See 56 FR 56694 (November 6, 1991); 40 CFR 81.306 (specifying 
designations for Colorado).
    Those States containing initial moderate PM10 nonattainment 
areas were required to submit several provisions by November 15, 1991. 
These provisions, including an attainment demonstration (or 
demonstration that timely attainment is impracticable), are described 
in EPA's proposed rulemaking for the Denver moderate PM10 
nonattainment area SIP (see 58 FR 66326, December 20, 1993). The Denver 
PM10 control measures targeted re-entrained road dust, residential 
wood burning, stationary sources and mobile sources for reductions in 
PM10 emissions to demonstrate attainment of the PM10 NAAQS. 
See the December 20, 1993, notice of proposed rulemaking and associated 
Technical Support Document (TSD) for further details.
    Such States were also required to submit contingency measures by 
November 15, 1993 (see 57 FR 13543). The Governor of Colorado initially 
submitted a contingency measure SIP for Denver on December 9, 1993. On 
March 30, 1994, the EPA notified the State that it had determined that 
the wintertime secondary particulate concentration contained in the 
June 7, 1993, Denver PM10 SIP submittal was underestimated by 5.4 
g/m3. Based upon that finding, the contingency measures 
contained in the December 9, 1993, submittal were used to provide 
further emission reductions for a revised attainment demonstration 
addressing the additional secondary impacts. The State then undertook a 
process to develop new contingency measures. The Governor submitted the 
new measures on November 17, 1995, for the Denver nonattainment area.

II. This Action

A. Analysis Requirements for State Submissions

1. Procedural Background
    The Act requires States to observe certain procedural requirements 
in developing implementation plans and plan revisions for submission to 
EPA [see Section 110(a)(2) and 110(l) of the Act]. EPA also must 
determine whether a submittal is complete and therefore warrants 
further EPA review and action [see section 110(k)(1) of the Act, 57 FR 
13565, and EPA's completeness criteria for SIP submittals in 40 CFR 
part 51, appendix V].
    To entertain public comment, the State of Colorado's Air Quality 
Control Commission (AQCC), after providing adequate notice, held a 
public hearing on March 16, 1995, to consider the Denver PM10 
contingency measures.

[[Page 49683]]

Following the hearing, the AQCC adopted revisions to Colorado 
Regulation No. 16 as the Denver PM10 contingency measures. The 
Contingency Measure SIP revision was formally submitted to EPA by the 
Governor for approval on November 17, 1995.
    The SIP revision was reviewed by EPA to determine completeness in 
accordance with the completeness criteria referenced above. The 
submittal was found to be complete, and a letter dated March 14, 1996, 
was forwarded to the Governor indicating the completeness of the 
submittal and the next steps to be taken in the processing of the SIP 
submittal.
2. PM10 Contingency Measures
    The Clean Air Act requires that States containing PM10 
nonattainment areas adopt contingency measures that will take effect 
without further action by the State or EPA upon a determination by EPA 
that an area failed to make RFP or to timely attain the applicable 
NAAQS, as described in section 172(c)(9). See generally 57 FR 13510-
13512 and 13543-13544. Pursuant to section 172(b), the Administrator 
established a schedule providing that states containing initial 
moderate PM10 nonattainment areas shall submit SIP revisions 
containing contingency measures no later than November 15, 1993. (See 
57 FR 13543.)
    The General Preamble further explains that contingency measures for 
PM10 should consist of other available control measures, beyond 
those necessary to meet the core moderate area control requirement to 
implement reasonably available control measures (see sections 172(c)(1) 
and 189(a)(1)(C) of the Act). Based on the statutory structure, EPA 
believes that contingency measures must, at a minimum, provide for 
continued progress toward the attainment goal during the interim period 
between the determination that the SIP has failed to achieve RFP/
provide for timely attainment of the NAAQS and the additional formal 
air quality planning following the determination (57 FR 13511).
    Section 172(c)(9) of the Act specifies that contingency measures 
shall ``take effect * * * without further action by the State or the 
[EPA] Administrator.'' EPA has interpreted this requirement (in the 
General Preamble at 57 FR 13512) to mean that no further rulemaking 
activities by the State or EPA would be needed to implement the 
contingency measures. In general, EPA expects all actions needed to 
effect full implementation of the measures to occur within 60 days 
after EPA notifies the State of its failure to attain the standard or 
make RFP.
    EPA recognizes that certain actions, such as notification of 
sources, modification of permits, etc., may be needed before some 
measures can be implemented. However, States must show that their 
contingency measures can be implemented with minimal further 
administrative action on their part and with no additional rulemaking 
action such as public hearing or legislative review.
    The Denver PM10 Contingency Measure SIP contains the following 
control measure--Improved Street Sweeping Technology. The control 
measure is found in Colorado Regulation No. 16, Street Sanding 
Emissions and provides that beginning November 1 of the first winter 
season after the determination and notification that the Denver 
PM10 nonattainment area has failed to attain the PM10 NAAQS 
or to make RFP, the contingency measure will be implemented.
    Below is a detailed description of the contingency measure adopted 
for the Denver moderate PM10 nonattainment area:
    a. Improved Street Sweeping Technology Contingency Measure. The 
Denver PM10 Contingency Measure SIP requires that any entity 
responsible for applying street sanding material within the Denver 
Central Business District (CBD), defined as the area bounded by Colfax 
Avenue, Speer Boulevard, Wynkoop Street, 20th Street and Broadway, 
shall clean all streets in the CBD using vacuum sweepers or a more 
effective technology within four days of each sanding episode, or as 
soon as weather permits. The requirements are found in revisions to 
Regulation No. 16, Street Sanding Emissions.
3. Effectiveness of the Contingency Measure
    Information provided in the SIP submittal indicates that 
implementation of the contingency measure would result in an additional 
15 g/m\3\ reduction of PM10 at the highest receptor in 
downtown Denver. This reduction equates to an additional 50% reduction 
in emissions over that demonstrated for the controls in the Denver 
moderate area SIP demonstration. This reduction exceeds the 25% 
emissions reduction which EPA expects from contingency measures as 
discussed in the General Preamble.
    EPA believes this contingency measure is approvable. The control 
measures implemented in the PM10 SIP are projected to achieve more 
emissions reductions than needed to demonstrate attainment of the 
PM10 NAAQS, as indicated by the State's predicted 24-hour 
attainment concentration of 147.8 g/m\3\. Furthermore, the 
predicted 24-hour ambient concentration resulting if the contingency 
measure is implemented is 132.8 g/m\3\. Since the 24-hour 
PM10 NAAQS is 150 g/m\3\, this established safety margin 
further supports the reasonableness of this contingency measure.
4. Early Implementation
    Section IV. B. of Colorado Regulation No. 16 sets out its early 
implementation policy as follows: Those parties subject to the 
contingency measure requirements could implement the measures at any 
time prior to EPA's determination that the area failed to attain the 
PM10 NAAQS or make RFP. Early implementation of these measures 
will not result in the requirement to implement additional contingency 
measures if the area eventually is determined to fail to attain the 
NAAQS or make RFP. If Denver were reclassified to a serious 
nonattainment area, additional control measures, including best 
available control measures and ``serious area'' contingency measures, 
would be necessary.
5. Enforceability Issues
    All measures and other elements in the SIP must be enforceable by 
the State and EPA (see Sections 172(c)(6), 110(a)(2)(A) and 57 FR 
13556). The EPA criteria addressing the enforceability of SIPs and SIP 
revisions were stated in a September 23, 1987, memorandum (with 
attachments) from J. Craig Potter, Assistant Administrator for Air and 
Radiation, et al. (see 57 FR 13541). State implementation plan 
provisions also must contain a program to provide for enforcement of 
control measures and other elements in the SIP [see section 
110(a)(2)(C)].
    EPA's review of the November 17, 1995, PM10 Contingency 
Measure Plan has revealed that the State has adequate authority to 
enforce state air regulations against local entities, and enforce local 
air pollution requirements when local entities fail to do so. In 
addition, the State has authority to implement and enforce all 
emissions limitations and control measures adopted by the AQCC. In 
summary, EPA believes that Colorado has adequate enforcement 
capabilities to ensure compliance with the Denver contingency measure 
SIP. For further information, see the TSD prepared for this document.

III. Final Action

    EPA is approving the PM10 contingency measure plan submitted 
for

[[Page 49684]]

the Denver moderate PM10 nonattainment area by the Governor of 
Colorado on November 17, 1995. This submittal adequately addresses the 
PM10 contingency measure requirements for Denver.
    EPA is publishing this action without prior proposal because the 
Agency views this as a noncontroversial amendment and anticipates no 
adverse comments. However, in a separate document in this Federal 
Register publication, EPA is proposing to approve the SIP revisions 
should adverse or critical comments be filed. Under the procedures 
established in the May 10, 1994 Federal Register (59 FR 24054), this 
action will be effective December 23, 1996 unless, by November 22, 
1996, adverse or critical comments are received.
    If EPA receives such comments, this action will be withdrawn before 
the effective date by publishing a subsequent notice that will withdraw 
the final action. All public comments received will then be addressed 
in a subsequent final rule based on this action serving as a proposed 
rule. EPA will not institute a second comment period on this action. 
Any parties interested in commenting on this action should do so at 
this time. If no such comments are received, the public is advised that 
this action will be effective on December 23, 1996.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any SIP. Each request for revision to a SIP shall be 
considered separately in light of specific technical, economic, and 
environmental factors and in relation to relevant statutory and 
regulatory requirements.

IV. Executive Order

    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from E.O. 12866 review.

V. Regulatory Flexibility

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant economic impact on a substantial number of small entities. 
Small entities include small businesses, small not-for-profit 
enterprises, and government entities with jurisdiction over populations 
of less than 50,000.
    Approvals of SIP submittals under section 110 and subchapter I, 
part D of the Clean Air Act do not create any new requirements, but 
simply approve requirements that the State is already imposing. 
Therefore, because the Federal SIP-approval does not impose any new 
requirements, I certify that it does not have a significant impact on 
small entities affected. Moreover, due to the nature of the Federal-
State relationship under the Clean Air Act, preparation of a regulatory 
flexibility analysis would constitute Federal inquiry into the economic 
reasonableness of State action. The Clean Air Act forbids EPA to base 
its actions concerning SIPs on such grounds. Union Electric Co. v. U.S. 
E.P.A., 427 U.S. 246, 256-66 (1976); 42 U.S.C. 7410(a)(2).

VI. Unfunded Mandates

    Under Section 202, of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under Section 205, EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires EPA to establish a plan 
for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    EPA has also determined that this promulgated action does not 
include a Federal mandate that may result in estimated costs of $100 
million or more to State, local, or tribal governments in the 
aggregate, or to the private sector. This Federal action approves pre-
existing requirements under State or local law, and imposes no new 
Federal requirements. Accordingly, no additional costs to State, local, 
or tribal governments, or to the private sector, result from this 
action.

VII. Submission to Congress and the General Accounting Office

    Under 5 U.S.C. 801(a)(1)(A) as added by the Small Business 
Regulatory Enforcement Fairness Act of 1996, EPA submitted a report 
containing this rule and other required information to the U.S. Senate, 
the U.S. House of Representatives and the Comptroller General of the 
General Accounting Office prior to publication of this rule in today's 
Federal Register. This rule is not a ``major rule'' as defined by 5 
U.S.C. 804(2).

VIII. Petition for Judicial Review

    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by November 22, 1996. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review must be filed, and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements (see section 307(b)(2)).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Particulate matter, Reporting 
and recordkeeping requirements.

    Dated: August 27, 1996.
Patricia D. Hull,
Acting Regional Administrator.

    Chapter I, title 40 of the Code of Federal Regulations is amended 
as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart G--Colorado

    2. Section 52.320 is amended by adding paragraph (c)(74) to read as 
follows:

Sec. 52.320  Identification of plan.

* * * * *
    (c) * * *
    (74) The Governor of Colorado submitted PM10 contingency 
measures for Denver, Colorado in a letter dated November 17, 1995.
    (i) Incorporation by reference.
    (A) Section IV. of Regulation No. 16, Street Sanding Emissions, 
adopted March 16, 1995, effective May 30, 1995.

[FR Doc. 96-24053 Filed 9-20-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-24051 Approval and Promulgation of Implementation Plans: Washington
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49688-49690]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24051]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[WA56-7131a; FRL-5603-7]

Approval and Promulgation of Implementation Plans: Washington

AGENCY: Environmental Protection Agency.

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is approving in part 
several minor revisions to the State of Washington Implementation Plan 
(SIP) and, at the same time, taking no action on two sections of these 
revisions which are unrelated to the purposes of the SIP. Pursuant to 
section 110(a) of the Clean Air Act (CAA), the Director of the 
Washington Department of Ecology (WDOE) submitted a request to EPA

[[Page 49689]]

dated May 24, 1996 to revise certain sections of a local air pollution 
control agency (the Puget Sound Air Pollution Control Agency) 
regulations.

DATES: This action is effective on November 22, 1996, unless adverse or 
critical comments are received by October 23, 1996. If the effective 
date is delayed, timely notice will be published in the Federal 
Register.

ADDRESSES: Copies of the SIP revision request and other information 
supporting this action are available for inspection during normal 
business hours at the following locations: EPA, Office of Air Quality 
(OAQ)-207), 1200 Sixth Avenue, Seattle, Washington 98101; and 
Washington State Department of Ecology, 300 Desmond Drive, Lacey, 
Washington 98504.

FOR FURTHER INFORMATION CONTACT: Tamara Langton, Office of Air Quality 
(OAQ-107), EPA, Seattle, Washington 98101, (206) 553-2709.

SUPPLEMENTARY INFORMATION:

I. Discussion of Submittal

    The WDOE May 24, 1996 submittal consists of minor amendments to the 
Puget Sound Air Pollution Control Agency (PSAPCA) Regulations I and 
III. Regulation I is being amended to be consistent with the state 
agricultural burning regulations and to allow training fires and fire 
extinguisher training by rule rather than by PSAPCA's formal written 
approval. The amendments to Regulation I were adopted by PSAPCA on 
February 8, 1996, and became effective on March 14, 1996. During the 
period offered by PSAPCA for public comments, no public testimony was 
offered.
    Regulation III is being amended to include new monitoring and 
recordkeeping requirements for perchloroethylene dry cleaning 
operations. This amendment to Regulation III was adopted by PSAPCA on 
November 8, 1995, and became effective on December 14, 1995. Again, 
there were no public comments submitted by the public.
    The above two minor amendments to Regulation I and III continue to 
provide clarity to revised sections and overall strengthening measures 
for the control of ozone within the affected nonattainment areas and, 
generally, the control of particulate matter.
    The PSAPCA amendments submitted by WDOE for inclusion into the SIP 
are local air pollution regulations which are at least as stringent as 
the statewide rules of WDOE. EPA has determined that these minor SIP 
revisions comply with all applicable requirements of the CAA and EPA 
policy and regulations concerning such revisions.

II. Summary of Today's Action

    EPA is, by today's action, approving in part Regulation I, Article 
8, Outdoor Fires, sections 8.02 and 8.05, and Regulation III, Article 
3, Source-Specific Emission Standards, section 3.03; deleting 
Regulation I, Article 8, section 8.01, Policy for Outdoor Fires; and, 
taking no action in part on Regulation I, Article 8, Outdoor Fires, 
sections 8.07 (Fire Extinguisher Training) and 8.08 (Fire Department 
Training Exercises) as these revisions are not directly related to the 
criteria pollutants regulated under the SIP.
    The EPA is publishing this action without prior proposal because 
the Agency views this as a noncontroversial amendment to the SIP and 
anticipates no adverse comments. However, in a separate document in 
this Federal Register publication, the EPA is proposing to approve the 
SIP revision should adverse or critical comments be filed. This action 
will be effective November 22, 1996, unless, by October 23, 1996, 
adverse or critical comments are received.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent notice that will 
withdraw the final action. All public comments received will be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time. If no such comments are received, the public is 
advised that this action will be effective November 22, 1996.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any SIP. Each request for revision to the SIP shall be 
considered separately in light of specific technical, economic and 
environmental factors and in relation to relevant statutory and 
regulatory requirements.

III. Administrative Requirements

A. Executive Order 12866

    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from E.O. 12866 review.

B. Regulatory Flexibility Act

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    SIP approvals under section 110 and subchapter I, Part D of the CAA 
do not create any new requirements, but simply approve requirements 
that the state is already imposing. Therefore, because the federal SIP-
approval does not impose any new requirements, I certify that it does 
not have a significant impact on any small entities affected. Moreover, 
due to the nature of the federal-state relationship under the CAA, 
preparation of a regulatory flexibility analysis would constitute 
federal inquiry into the economic reasonableness of state action. The 
CAA forbids EPA to base its actions concerning SIPs on such grounds. 
Union Electric Co. v. E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 42 
U.S.C. 7410(a)(2).

C. Unfunded Mandates

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under Section 205, EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires EPA to establish a plan 
for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    EPA has determined that the approval action promulgated does not 
include a Federal mandate that may result in estimated costs of $100 
million or more to either State, local, or tribal governments in the 
aggregate, or to the private sector. This Federal action approves pre-
existing requirements under State or local law, and imposes no new 
Federal requirements.

[[Page 49690]]

Accordingly, no additional costs to State, local, or tribal 
governments, or to the private sector, result from this action.

D. Submission to Congress and the General Accounting Office

    Under 5 U.S.C. 801(a)(1)(A) as added by the Small Business 
Regulatory Enforcement Fairness Act of 1996, EPA submitted a report 
containing this rule and other required information to the U.S. Senate, 
the U.S. House of Representatives and the Comptroller General of the 
General Accounting Office prior to publication of the rule in today's 
Federal Register. This rule is not a ``major rule'' as defined by 5 
U.S.C. 804(2).

E. Petitions for Judicial Review

    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by November 22, 1996. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review may be filed and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements. (See section 307(b)(2), 42 U.S.C. 
7607(b)(2).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Particulate matter, Reporting 
and recordkeeping requirements, Volatile organic compounds.

    Dated: August 19, 1996.
Charles Findley,
Acting Regional Administrator.

    Note: Incorporation by reference of the Implementation Plan for 
the State of Washington was approved by the Director of the Office 
of Federal Register on July 1, 1982.

    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for Part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart WW--Washington

    2. Section 52.2470 is amended by adding paragraph (c) (65) to read 
as follows:

Sec. 52.2470  Identification of plan.

* * * * *
    (c) * * *
    (65) Several minor revisions consisting of amended regulations 
affecting a local air agency, the Puget Sound Air Pollution Control 
Agency, were submitted to EPA from the Washington State Department of 
Ecology for inclusion into the Washington State Implementation Plan.
    (i) Incorporation by reference.
    (A) Letter dated May 24, 1996 from the Director of the Washington 
State Department of Ecology to the EPA Regional Administrator 
submitting revisions to the Puget Sound Air Pollution Control Agency 
regulations for inclusion into the State Implementation Plan: Puget 
Sound Air Pollution Control Agency, Regulation I, Article 8, Outdoor 
Fires, sections 8.02, Outdoor Fires-Prohibited Types, and 8.05, 
Agricultural Burning, effective 3/14/96; Puget Sound Air Pollution 
Control Agency, Regulation III, Article 3, Source-Specific Emission 
Standards, section 3.03, Perchloroethylene Dry Cleaners, effective 12/
14/95.

[FR Doc. 96-24051 Filed 9-20-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-24047 State of Texas; Approval of State Implementation Plan (SIP) Addressing the Sulfur Dioxide Emission Limit; Site-Specific Revision to the SIP for the Aluminum Company of America (ALCOA) Facility in Rockdale, TX
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49685-49688]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24047]

[[Page 49685]]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[TX-58-1-7256a; FRL-5557-8]

State of Texas; Approval of State Implementation Plan (SIP) 
Addressing the Sulfur Dioxide Emission Limit; Site-Specific Revision to 
the SIP for the Aluminum Company of America (ALCOA) Facility in 
Rockdale, TX

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: This document announces the EPA's decision to approve a 
September 20, 1995, request from the State of Texas for a site-specific 
revision to the Texas sulfur dioxide (SO2) SIP. The revision 
amends the SO2 emission limitations applicable to the ALCOA 
facility in Milam County, Texas. In this action, the EPA is approving 
Texas' SIP revision allowing an increase in lignite fuel emissions of 
SO2 from 3.0 pounds per million British thermal units (lb/MMBtu) 
to 4.0 lb/MMBtu. The SIP revision also includes new requirements for 
limits on the sulfur content of the petroleum coke used at the ALCOA 
facility and an increased stack height to ``Good Engineering 
Practices'' (GEP) as defined in 40 CFR 51.100 (ii). Texas has modeled 
these changes demonstrating that with the revisions the National 
Ambient Air Quality Standards (NAAQS) for SO2 will remain 
protected.

DATES: This action is effective on November 22, 1996, unless adverse 
comments are received by October 23, 1996. If the effective date is 
delayed, timely notice will be published in the Federal Register.

ADDRESSES: Comments should be mailed to Thomas H. Diggs, Chief, Air 
Planning Section (6PD-L), Environmental Protection Agency Region 6, 
1445 Ross Avenue, Dallas, Texas 75202-2733. Copies of the State's 
petition and other information relevant to this action are available 
for inspection during normal hours at the following locations:

Environmental Protection Agency, Region 6, Air Planning Section (6PD-
L), 1445 Ross Avenue, Suite 1200, Dallas, TX 75202-2733.
Air and Radiation Docket and Information Center, Environmental 
Protection Agency, 401 M. Street, S.W., Washington, DC 20460.
Texas Natural Resource Conservation Commission, Office of Air Quality, 
12124 Park 35 Circle, P.O. Box 13087, Austin, TX 78711-3087.

    Anyone wishing to review this petition at the EPA office is asked 
to contact the person below to schedule an appointment 24 hours in 
advance.

FOR FURTHER INFORMATION CONTACT: Ms. Petra Sanchez, Air Planning 
Section (6PD-L), Environmental Protection Agency, Region 6, 1445 Ross 
Avenue, Dallas, Texas 75202-2733, telephone (214) 665-6686.

SUPPLEMENTARY INFORMATION:

I. Background

    On May 31, 1972 the EPA approved the original Texas SIP submission 
allowing for 3.0 lbs/MMBtu SO2 emissions from solid fossil fuel-
fired steam generators at the ALCOA plant. In 1979, ALCOA petitioned 
the Texas Air Control Board (TACB), now the Texas Natural Resource 
Conservation Commission (TNRCC), to allow relaxed SO2 emission 
limitations for its power plant units.
    The 1979 relaxation increased the allowable SO2 limit to 5.0 
lb/MMBtu, and was published in the Texas Register on July 6, 1979. 
After a public hearing conducted by the TACB on November 13, 1979, 
ALCOA modified its original petition and agreed to gradually lower the 
SO2 emission limit from 5.0 lb/MMBtu SO2 to 4.5 lb/MMBtu in 
1981, and eventually to 4.0 lb/MMBtu after January 1, 1982. The TACB 
adopted this phased-in schedule on December 14, 1979, thus, lowering 
the requirement to 4.0 lb/MMBtu, as it remains today in the Texas 
regulations (see TAC Sec. 112.8). However, the increase in allowable 
SO2 limits was not officially revised and submitted to the EPA for 
approval as a SIP revision. Also in 1979, a new 545 MW power plant 
(Sandow Four) was built, doubling the fuel capacity from 2.1 million to 
5.6 million tons of lignite per year. Sandow Four is owned by TU 
Electric Company and is under a contractual agreement with ALCOA to 
supply most of its power to ALCOA's operations. Therefore, Sandow Four 
Unit is not part of this SIP action but must meet more stringent 
emissions limitations. Sandow Four has a Prevention of Significant 
Deterioration (PSD) permit and is under New Source Performance 
Standards (NSPS) as well thus, BACT (Best Available Control Technology) 
applies. Under NSPS, Sandow Four is subject to a limitation of 1.2 lb/
MMBtu SO2 emissions in accordance with 40 CFR 60, Subpart D.

SIP Violation

    On May 5, 1981, the EPA issued a Notice of Violation to ALCOA for 
exceeding the 3.0 lb/MMBtu SO2 limit in the approved 1972 SIP. 
Without an approved SIP revision, ALCOA should have complied with the 
3.0 lb/MMBtu limit under federal law rather than the higher state 
limit. The SIP revision provided by Texas includes information on the 
ALCOA facilities (i.e., Sandow One, Two, and Three) to ensure that a 
sulfur limit relaxation for those units will result in acceptable 
levels of SO2 concentrations and to ensure continued attainment of 
the SO2 National Ambient Air Quality Standards. To support the 
proposal, ALCOA submitted technical feasibility studies and economic 
evaluations, supported by ambient monitoring data and dispersion 
modeling. Compliance with the NAAQS and Prevention of Significant 
Deterioration (PSD) increments for SO2 emission levels were 
supported through modeling procedures. The final submittal from the 
State contained limits on the use of sulfur-bearing fuels for the three 
units to prevent potential violations of the SO2 NAAQS. A public 
hearing announcement was published on May 11, 1995, and a hearing was 
held on June 14, 1995, in Rockdale, Texas. No adverse comments were 
received. Comments were generally supportive of the action. The EPA 
found the SIP revision to be administratively complete in a letter 
dated November 28, 1995. For further details on the SIP submittal, 
please reference the Technical Support Document on file.

Good Engineering Practice and Stack Height Increase at Sandow Three

    In June of 1995, ALCOA completed construction of a new stack for 
Sandow Three to increase the height of the emission point from 81 to 
161 meters. The increase in height helped avoid the down-washing effect 
caused by the presence of large nearby structures. However, another 
effect of increasing stack height is to disperse emissions over a 
larger area, resulting in lower ambient concentrations without a true 
emissions reduction in grams per second. To limit over-crediting, the 
EPA federal regulations which define ``Good Engineering Practices'' 
(GEP) for the stack height, were evaluated to ensure that emissions do 
not result in excessive concentrations due to atmospheric downwash, or 
wakes created by terrain or structures in the vicinity of a source. 
Requirements, promulgated under 40 CFR Part 51, regulate stack height 
``credits'' instead of actual stack height.
    A GEP stack is defined under 40 CFR 51.100 (ii) by a formula that 
relates stack height to the dimensions of nearby structures, thus 
restricting stack increases to the modeling height necessary to avoid 
over-crediting by dilution. It also specifies certain site-specific 
demonstrations that are required to justify increases of an

[[Page 49686]]

existing stack to GEP formula height. The EPA interpretation of this 
rule (stated in a July 29, 1992 memo from the EPA's Office of Air 
Quality Planning and Standards to the EPA Directors) waives the 
requirement for a site-specific demonstration if a new structure has 
been built since the construction of the original stack. Thus, the 
siting of a new nearby structure removes a presumption that the 
original stack height is the GEP height, since the new structure may 
create downwash effects that were not anticipated in the original stack 
design. In ALCOA's case, the stack for Sandow Three was built in the 
early 1950's and Sandow Four was built in the late 1970's on adjacent 
property. The presence of the Sandow Four structure created new 
downwash effects. Therefore, the stack height increase is allowed by 
the EPA's stack height regulations, as long as it is within the 
allowable height as defined by 40 CFR 51.100(ii).

Dispersion Modeling Analysis

    Dispersion modeling was used to demonstrate that ambient SO2 
concentrations are predicted to be below the NAAQS and allowable 
Prevention of Significant Deterioration (PSD) increments. Dispersion 
modeling integrates historical meteorological data and continuous 
industrial emissions to predict whether the population outside of a 
facility's property could be exposed to SO2 levels above 
applicable health-based standards.
    Alcoa hired Earth Tech/Sigma Research to conduct the modeling 
analyses to demonstrate that the ALCOA aluminum reduction facility and 
power plant was in compliance with the NAAQS. The PSD increments 
modeling was also performed to determine whether an incremental 
increase in SO2 emissions from three to four pounds per MMBtu heat 
input at Units one, two, and three of the Sandow Power Plant would 
cause any violations.
    The Industrial Source Complex--Short Term (ISCST2) model was used 
to model the Sandow power plant point sources along with 132 non-ALCOA 
background sources. The Buoyant Line and Point (BLP) Source model was 
used to model all of the line and scrubber stacks for the aluminum 
reduction facilities. The meteorological data used in the analyses were 
obtained from the Austin surface station and the Stephenville upper air 
station. The modeling was conducted in accordance to EPA's Guideline on 
Air Quality Models and were generally consistent with the EPA's 
regulatory recommendations.

NAAQS Modeling Analysis

    The NAAQS analyses was performed in three phases. Results of the 
ISCST2 model and BLP dispersion modeling runs were summed up to provide 
ambient concentrations on an hourly basis for each receptor. Ambient 
concentrations were then compared with the primary and secondary NAAQS. 
The NAAQS limits are:

                         National SO2 Standards                         
------------------------------------------------------------------------
                                                              Micrograms
                                                               per cubic
                            NAAQS                             meter  (ug/
                                                                  m3)   
------------------------------------------------------------------------
Primary annual SO2..........................................         80 
Primary 24-hour.............................................        365 
Secondary 3-hour............................................      1,300 
------------------------------------------------------------------------

    To demonstrate compliance with the SO2 NAAQS, four 
alternatives were used (based on smelter production levels and sulfur 
content in the anodes). As discussed in the Technical Support Document, 
the modeling runs predicted no violations of the applicable NAAQS.
    The predicted concentrations for the annual average and the 
highest-second-high (H2H) concentrations for three-hour and 24-hour 
concentrations were below the SO2 NAAQS for all years evaluated. 
The maximum annual concentrations for seven and eight lines scenarios 
are 76.83 ug/m3 and 76.90 ug/m3, respectively. Both occur at 
684900 easting and 3389100 northing, approximately six kilometers north 
of the center of the ALCOA Rockdale facility. Meanwhile, the maximum 
H2H 24-hour concentration which occurs with the 2.6 percent sulfur 
content eight-line scenario is 355.29 ug/m3 at 683783 easting and 
3381889 northing. The maximum H2H three-hour concentration which occurs 
with the 3.0 percent sulfur content seven-line operating scenario is 
1025.59 ug/m3 at 682500 easting and 3382000 northing.

PSD Modeling Analysis

    In addition to the NAAQS evaluations, the EPA requires an analysis 
to ensure that incremental increases of SO2 due to a SIP 
relaxation will not cause a violation of the PSD increments. Milam 
County is classified as a Class II area for the purpose of establishing 
its allowable PSD increments.
    There are no Class III areas in Texas. Numerical increments for 
SO2 are defined below as the maximum increase above baseline, 
ambient concentrations.

                Class II PSD Increment Standards for SO2                
------------------------------------------------------------------------
                         PSD increment                            ug/m3 
------------------------------------------------------------------------
Annual SO2 average............................................        20
24-hour SO2 average...........................................        91
3-hour SO2 average............................................       512
------------------------------------------------------------------------

    The PSD modeling analysis was also performed in three phases. For 
the PSD analysis, the main ALCOA increment-consuming sources are Sandow 
One, Two, and Three. These sources were modeled with ISCST2 using a 1.0 
lb/MMBtu emission rate increase, representing the proposed increase in 
allowable SO2 emission from 3.0 to 4.0 lb/MMBtu. Sandow Four was 
also included in the modeling because it too consumes PSD increment. 
The modeling predicted some exceedances of allowable PSD increments in 
an area about thirty kilometers to the southwest of the ALCOA facility. 
The predicted exceedances however, occurred inside the private property 
owned by the Acme Brick Company.

Closure of FM 1786 and Construction of Alternate Route

    The TNRCC modeling staff predicted excesses of the NAAQS on a 
public roadway, Farm-to-Market Road 1786 (FM 1786), which was 
originally built as an entrance into the plant. ALCOA confirmed these 
possible impacts in their preliminary modeling efforts. After the 
public hearing, ALCOA and Milam County agreed to provide an alternate 
route as part of the county road system, resolving potential citizen 
complaints. ALCOA eventually acquired a 2.4-mile section of FM 1786 and 
privatized the road to limit its public access. On November 23, 1994, 
the Governor of Texas signed the deed transferring this section of 
roadway to ALCOA. With the closure of the former FM 1786, which is the 
entrance to the Rockdale Operations Facility, measures to restrict 
public access are to be taken. A gate has been installed and security 
guards patrol for unauthorized entry.

Monitoring

    ALCOA is currently operating a monitoring network with two monitors 
collecting data on SO2 concentrations, fluoride, wind speed, and 
wind direction. The Agreed Order requires ALCOA to continue providing 
ambient SO2 and meteorological monitors installed and operated at 
the TNRCC approved sites in accordance with the Quality Assurance 
Project Plan (QAPP) to ensure that the NAAQS are protected. The QAPP 
was submitted to the TNRCC for approval and was approved on June

[[Page 49687]]

13, 1995. The TNRCC assumes all responsibility for ensuring quality 
data collection, analysis, calibration, and reporting requirements from 
ALCOA will protect the NAAQS. Monitoring reports submitted to the TNRCC 
currently show no exceedances of the NAAQS.

Enforceability

    In order to protect the annual NAAQS, an annual limit of 3.1 
million MW-hours of power generation from Sandow One, Two and Three is 
imposed on the facility. This limit was used to calculate the annual 
average for all four operating scenarios modeled. The Agreed Order 
adopted by TNRCC and ALCOA ensure the annual limits will be enforced 
and become federally enforceable through this SIP action. Within sixty 
days after adoption of the Agreed Order by the TNRCC, ALCOA began a 
fuel sampling program to determine continuous compliance with the 
emissions limit of 4.0 lbs SO2/MMBtu.
    ALCOA is required to ensure that the total percentage of sulfur 
contained in the new petroleum coke used in the anodes in the operating 
potlines and portions of potlines do not exceed the following amount 
when averaged over a thirty-day period and considering the number of 
potlines in operation during that period:

------------------------------------------------------------------------
                                                             Percent SO2
                                                              allowed in
                Number of operating potlines                     new    
                                                              petroleum 
                                                                 coke   
------------------------------------------------------------------------
8..........................................................          2.6
7 or fewer.................................................          3.0
------------------------------------------------------------------------

    When additional potlines or portions of potlines are started up or 
shut down, the maximum allowable percentage of sulfur in the new 
petroleum coke shall conform with the applicable sulfur limits stated 
above. If ALCOA operates a portion of a potline between the number of 
potlines specified above, the maximum allowable percentage of sulfur in 
the new petroleum coke shall be determined by proportional 
interpolations between the pair of limits specified above. ALCOA will 
notify the TNRCC Regional Office ten (10) days prior to the start up or 
shut down of any potline(s) or portions of potlines except that in the 
case of an emergency shutdown, notice shall be given as soon as 
reasonably possible.
    ALCOA is prohibited from using any new petroleum coke without test 
reports or on-site testing demonstrating compliance. ALCOA is also 
required to ensure that the sulfur content of the returned anode butts 
is no greater than the sulfur content of the new petroleum coke used in 
the manufacture of those returned anode butts. ALCOA will demonstrate 
compliance with the total sulfur content limits specified in the Agreed 
Order by limiting the percent sulfur in new petroleum coke to the 
petroleum coke supplier and will require its supplier to sample, 
analyze, and demonstrate that the total sulfur content complies with 
ALCOA's percent sulfur specification before shipment of any single lot 
of new petroleum coke is made. Test reports from suppliers may be used 
to document the sulfur content of new petroleum coke, or on-site 
testing of each incoming new petroleum coke shipment in accordance with 
ASTM Methods D346-90 or ASTM D4239-85. ALCOA will maintain records 
documenting compliance with the requirements of the Agreed Order. 
Records will include computations which show the amounts and total 
percent sulfur content of new petroleum coke and the sulfur content of 
the returned anode butts used in production of anodes. The sulfur 
content of the returned anode butts may be based on records of the new 
petroleum coke that went into them and ALCOA records showing the 
statistically established relationship between that sulfur content and 
the sulfur content of returned anode butts.

Recordkeeping and Reporting Requirements

    ALCOA will maintain a record of the gross power generated for each 
calendar month, and of the gross power generated for the previous 
twelve month period. Records will be made available upon request to the 
TNRCC, the EPA or any local air pollution control agency having 
jurisdiction. Periodic compliance demonstrations will be conducted at 
least quarterly beginning with the calendar quarter ending December 31, 
1995 using methods prescribed for the initial demonstration in the 
Agreed Order. Results will be reported to the TNRCC and the EPA Region 
VI no later than thirty days after the completion of testing.
    The provisions for the Milam County Agreed Order are adopted 
through this SIP action. The Order includes SO2 maximum allowable 
emissions limits, recordkeeping, reporting and compliance monitoring 
requirements and other required stipulations briefly described in this 
notice. For further details on compliance monitoring and record keeping 
requirements please reference the Agreed Order and the Technical 
Support Document.

Final Rulemaking Action

    In today's action, the EPA is approving the ALCOA SIP revision 
which includes among other things, TNRCC Agreed Order No. 95-0583-SIP. 
Texas's revised Milam County SO2 Order creates an enforceable 
restriction on the operations of a primary aluminum smelting plant and 
three units of a lignite-fueled power plant at the ALCOA facility. This 
action is also approving revisions to 31 TAC Chapter 112, section 
112.8, ``Allowable Emissions From Solid Fossil Fuel-Fired Steam 
Generators,'' Subsections 112.8(a) and 112.8(b). Adequate modeling 
demonstrating that the NAAQS for SO2 and SO2 PSD increment 
will be protected in Milam County, Texas was also provided.
    This action is being published without a prior proposal because the 
EPA views this as a noncontroversial revision and anticipates no 
adverse comments to the proposal. However, the EPA is publishing a 
separate document in this Federal Register publication, which 
constitutes a ``proposed approval'' of the requested SIP revision and 
clarifies that the rulemaking will not be deemed final if timely 
adverse or critical comments are filed. The ``direct final'' approval 
shall be effective on November 22, 1996, unless the EPA receives 
adverse or critical comments by October 23, 1996.
    If the EPA receives comments adverse to or critical of the approval 
discussed above, the EPA will withdraw this approval before its 
effective date by publishing a subsequent Federal Register document 
which withdraws this final action. All public comments received will 
then be addressed in a subsequent rulemaking document. Please be aware 
that the EPA will institute a second comment period on this action only 
if warranted by significant revisions to the rulemaking based on 
comments received in response to this action. Any parties interested in 
commenting on this action should do so at this time. If no such 
comments are received, the EPA hereby advises the public that this 
action will be effective on November 22, 1996.
    Nothing in this action should be construed as permitting, allowing 
or establishing a precedent for any future request for revision to any 
SIP. The EPA shall consider each request for revision to the SIP in 
light of specific technical, economic, and environmental factors and in 
relation to relevant statutory and regulatory requirements.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the

[[Page 49688]]

procedures published in the Federal Register on January 19, 1989 (54 FR 
2214-2225), as revised by a July 10, 1995, memorandum from Mary D. 
Nichols, Assistant Administrator for Air and Radiation. The Office of 
Management and Budget (OMB) has exempted this regulatory action from 
Executive Order 12866 review. Section 202 of the Unfunded Mandates 
Reform Act of 1995, signed into law on March 22, 1995, requires that 
the EPA prepare a budgetary impact statement before promulgating a rule 
that includes a Federal mandate that may result in expenditure by 
State, local, and tribal governments, in aggregate, or by the private 
sector, of $100 million or more in any one year. Section 203 requires 
the EPA to establish a plan for obtaining input from and informing, 
educating, and advising any small governments that may be significantly 
or uniquely affected by the rule.
    Under section 205 of the Unfunded Mandates Reform Act, the EPA must 
identify and consider a reasonable number of regulatory alternatives 
before promulgating a rule for which a budgetary impact statement must 
be prepared. The EPA must select from those alternatives the least 
costly, most cost-effective, or least burdensome alternative that 
achieves the objectives of the rule, unless the EPA explains why this 
alternative is not selected or the selection of this alternative is 
inconsistent with law.
    This final rule is estimated to result in the expenditure by State, 
local, and tribal governments or the private sector of less then $100 
million in any one year. Therefore the EPA has not prepared a budgetary 
impact statement or specifically addressed the selection of the least 
costly, most cost-effective, or least burdensome alternative. Small 
governments will not be significantly or uniquely affected by this 
rule. Hence, the EPA is not required to develop a plan with regard to 
small governments. This rule only approves the incorporation of 
existing State rules into the SIP. It imposes no additional 
requirements.
    Under 5 U.S.C. 801 (a)(1)(A) as added by the Small Business 
Regulatory Enforcement Fairness Act of 1996, EPA submitted a report 
containing this rule and other required information to the U.S. Senate, 
the U.S. House of Representatives and the Comptroller General of the 
General Accounting Office prior to publication of the rule in today's 
Federal Register. This rule is not a ``major rule'' as defined by 5 
U.S.C. 804(2).
    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., the EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities (5 U.S.C. 603 and 604). 
Alternatively, the EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    SIP approvals under section 110 and subchapter I, part D of the Act 
do not create any new requirements but simply approve requirements that 
the State is already imposing. The Federal SIP approval does not impose 
any additional requirements. Therefore, I certify that the SIP does not 
have a significant impact on any small entities affected. Moreover, due 
to the nature of the Federal-State relationship under the Act, 
preparation of a regulatory flexibility analysis would constitute 
Federal inquiry into the economic reasonableness of the State action. 
The Act forbids the EPA to base its actions concerning SIPs on such 
grounds. See Union Electric Co. v. EPA, 427 U.S. 246, 256-66 (S.Ct. 
1976); 42 U.S.C. 7410(a)(2).
    Under section 307(b)(1) of the Act, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by November 22, 1996. Filing a petition for 
reconsideration by the Regional Administrator of this final rule does 
not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review may be filed, and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements. See section 307(b)(2).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Sulfur oxides.

    Dated: August 9, 1996.
Allyn M. Davis,
Acting Regional Administrator.

    Title 40, part 52, of the Code of the Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart SS--Texas

    2. Section 52.2270 is amended by adding paragraph (c) (101) to read 
as follows:

Sec. 52.2270   Identification of Plan.

* * * * *
    (c) * * *
    (101) Revisions to Texas Natural Resource Conservation Commission 
Regulation II and the Texas State Implementation Plan concerning the 
Control of Air Pollution from Sulfur Compounds, submitted by the 
Governor by cover letters dated October 15, 1992 and September 20, 
1995. These revisions relax the SO2 limit from 3.0 lb/MMBtu to 4.0 
lb/MMBtu, and include Agreed Order No. 95-0583-SIP, which stipulates 
specific SO2 emission limit compliance methodologies for the 
Aluminum Company of America, located in Rockdale, Texas.
    (i) Incorporation by reference.
    (A) Texas Natural Resource Conservation Commission Agreed Order No. 
95-0583-SIP, approved and effective on August 23, 1995.
    (B) Revisions to 31 TAC Chapter 112, Section 112.8, ``Allowable 
Emissions From Solid Fossil Fuel-Fired Steam Generators,'' Subsections 
112.8(a) and 112.8(b) as adopted by the TNRCC on August 23, 1995.
    (ii) Additional material.
    (A) The State submittal entitled Revisions to the State 
Implementation Plan Concerning Sulfur Dioxide in Milam County, dated 
June 14, 1995.
    (B) The document entitled Dispersion Modeling Analysis of ALCOA 
Rockdale Operations, Rockdale, Texas, dated April 28, 1995 (document 
No. 1345-05).

[FR Doc. 96-24047 Filed 9-20-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-23986 Community Development Corporation and Project Investments and Other Public Welfare Investments
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49654-49662]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23986]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Office of the Comptroller of the Currency

12 CFR Part 24

[Docket No. 96-21]
RIN 1557-AB46

Community Development Corporation and Project Investments and 
Other Public Welfare Investments

AGENCY: Office of the Comptroller of the Currency, Treasury.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: As part of its Regulation Review Program, the Office of the 
Comptroller of the Currency (OCC) is revising its regulation governing 
national bank investments designed primarily to promote the public 
welfare. This final rule clarifies banks' authority; renumbers and 
reorganizes sections of the regulation; modifies the test for 
determining whether investments primarily promote the public welfare; 
and simplifies the regulation's investment self-certification and prior 
approval processes. This final rule reduces regulatory burden and 
inconsistencies while enhancing the ability of national banks to make 
community development and other public welfare investments.

EFFECTIVE DATE: October 23, 1996.

FOR FURTHER INFORMATION CONTACT: Karen Bellesi, Acting Deputy Director, 
Community Development Division, (202) 874-4940; or Michele Meyer, 
Senior Attorney, Community and Consumer Law Division, (202) 874-5750, 
Office of the Comptroller of the Currency, 250 E Street, SW, 
Washington, DC 20219.

SUPPLEMENTARY INFORMATION:

Background

    The OCC has reviewed 12 CFR part 24 as part of its Regulation 
Review Program (Program). Goals of the Program are eliminating 
provisions that do not contribute significantly to maintaining the 
safety and soundness of national banks or to accomplishing the OCC's 
other statutory responsibilities, updating and modernizing the OCC's 
rules where appropriate, and clarifying the OCC's regulations to convey 
more effectively the standards the OCC seeks to apply. Consistent with 
these goals, this final rule reduces regulatory burden on national 
banks and clarifies the standards that the OCC applies to national 
banks' community development and public welfare investment programs.

The Proposal

    On December 28, 1995, the OCC published a notice of proposed 
rulemaking (NPRM) (60 FR 67091) to revise 12 CFR part 24. Part 24 
implements 12 U.S.C. 24(Eleventh), which authorizes national banks to 
make investments ``designed primarily to promote the public welfare, 
including the welfare of low- and moderate-income families and 
communities (such as through the provision of housing, services, or 
jobs),'' subject to certain percentage of capital limitations.
    As initially written, part 24 placed predominant emphasis on 
community development investments. Part 24 permitted national banks to 
make investments in community development corporations (CDCs) and 
community development projects (CD Projects), consistent with safe and 
sound banking practices. Under part 24, banks could self-certify 
certain community development investments. Investments that were not 
eligible for self-

[[Page 49655]]

certification were subject to one of two prior approval processes. The 
first required a bank to file an investment proposal, which the OCC 
usually approved or disapproved within 30 days. The second consisted of 
a five-day review period for investment proposals that the OCC had 
previously approved for another bank.
    In the NPRM, the OCC proposed replacing part 24's public welfare 
test with modified criteria for determining whether an investment 
promotes the public welfare, including a non-exhaustive list of 
permissible public welfare activities. The NPRM also proposed 
streamlining part 24's investment self-certification and prior approval 
provisions. In addition, the NPRM removed redundant or otherwise 
unnecessary provisions from the former rule and made several other 
changes intended to improve the rule's clarity. Finally, the NPRM asked 
for comment on whether the OCC should continue its policy of not using 
part 24 authority as a basis for approving an investment that is 
otherwise permissible under 12 U.S.C. 24(Seventh).

The Final Rule and Comments Received

    The OCC received seven comments. Most commenters supported the 
proposed changes. Comments were submitted by three national banks, one 
savings bank, two trade groups, and one national non-profit 
organization that provides support for local non-profit CDCs. As 
discussed later in this preamble, several commenters supported the 
proposal but suggested that the OCC make additional changes, and one 
commenter opposed the proposed changes to the former rule's public 
welfare test and self-certification provisions. The following 
discussion summarizes these comments and the amendments to part 24.

Title

    The NPRM proposed changing the title of part 24 from ``Community 
Development Corporation and Project Investments'' to ``Community 
Development Corporation and Project Investments and other Public 
Welfare Investments.'' This change reflects the OCC's view that 
national banks can promote the public welfare through a variety of 
authorized investments, as described in Sec. 24.3, in addition to CDCs 
and CD Projects. The OCC received no comments on this issue, and 
accordingly adopts the proposed title change.

Authority, Purpose, and OMB Control Number (Sec. 24.1)

    The NPRM proposed amending the ``purpose'' paragraph of the 
regulation to reflect that CDCs and CD Projects that develop affordable 
housing, foster revitalization and stabilization of low-and moderate-
income areas, or provide equity or debt financing for small businesses 
are just some of the types of investments that a national bank can make 
under part 24. The preamble to the NPRM emphasized that the OCC 
continues to encourage national banks to make these types of 
investments but also stressed that banks may undertake other kinds of 
public welfare investments. The OCC received no comments specifically 
on this proposed section. However, as discussed later in this preamble, 
the OCC received comments on proposed Sec. 24.3 that resulted in 
modifications to that section to provide that banks' part 24 
investments benefit low- and moderate-income individuals, low- and 
moderate-income areas, or other areas targeted for redevelopment by 
local, state, tribal or Federal government. Consistent with the change 
to Sec. 24.3, the OCC adopts proposed Sec. 24.1 with a modification to 
the ``purpose'' paragraph to clarify that bank efforts to promote the 
public welfare through small business investment or area revitalization 
or stabilization must be targeted to low- and moderate-income areas or 
other redevelopment areas.

Definitions (Sec. 24.2)

    In keeping with the Regulation Review Program's goal of using 
terminology consistently throughout the OCC's regulations, the NPRM 
proposed the use of definitions and terms common to other OCC 
regulations. For example, the definition of ``low-income and moderate-
income'' in the NPRM referred to the OCC's CRA Regulation (12 CFR part 
25). One commenter supported the OCC's efforts to standardize various 
definitions in its regulations, but voiced the concern that the CRA 
definition of ``low-income and moderate-income'' was more restrictive 
than the definition in the former part 24.
    Under the former rule and the OCC's CRA regulation, low- and 
moderate-income individuals are individuals whose incomes are less than 
80 percent of the median income of the area in which they live. The 
former rule defined low- and moderate-income areas slightly differently 
from the OCC's CRA regulation, however. The former rule defined low- 
and moderate-income areas as areas where at least 51 percent of the 
residents are low- and moderate-income persons and families. The CRA 
regulation defines low- and moderate-income areas as areas where at 
least 50 percent of the families have incomes less than 80 percent of 
the area median family income. 12 CFR 25.12. Thus, the CRA regulation 
is slightly more expansive in its definition of low- and moderate-
income areas than the former rule. The OCC believes that the difference 
between the two definitions is insignificant and that adopting the CRA 
regulation definition of low-and moderate-income in this final rule 
will enhance its clarity and reduce the burden associated with having 
different definitions of the same terms in the OCC's regulations. 
Accordingly, the OCC adopts the proposed definition of ``low-income and 
moderate-income.''
    The NPRM also proposed using the same definition of ``capital and 
surplus'' as the OCC's Lending Limit Regulation, 12 CFR part 32, which 
refers to components of capital that national banks calculate for 
purposes of determining their risk-based capital under 12 CFR part 3. 
The OCC received no comments on this section and, accordingly, adopts 
the proposed definition of ``capital and surplus.''
    The NPRM omitted the former rule's definitions of community 
development limited partnership and community-based development 
corporation as unnecessary further examples of vehicles that national 
banks may use to make investments under this part. The OCC received no 
comments on this proposed removal, and accordingly adopts the proposed 
change. This change does not affect a national bank's authority to 
invest in a community development limited partnership or community 
based development corporation. Consistent with the requirements of this 
part, a national bank may continue to invest in these and other 
vehicles.
    The NPRM proposed adding a definition of ``eligible bank'' that is 
the same as the ``eligible bank'' definition proposed by the OCC for 
corporate applications in its November 29, 1994 notice of proposed 
rulemaking concerning 12 CFR part 5 (59 FR 61034). The NPRM proposed 
allowing a bank to self-certify investments for purposes of part 24 if 
it has a composite rating of 1 or 2 under the Uniform Financial 
Institutions Rating System, has at least a satisfactory CRA rating, is 
well capitalized, and is not subject to any current OCC enforcement 
actions. One commenter suggested that the final rule limit self-
certification eligibility to only banks with outstanding CRA ratings. 
The OCC declines to make this change for two reasons. First, part 24

[[Page 49656]]

investments represent an important mechanism for banks to improve their 
CRA records. Second, limiting self-certification to banks with 
outstanding CRA ratings would result in far fewer banks benefiting from 
the streamlined self-certification processes proposed in the NPRM. The 
OCC accordingly adopts the proposed definition of ``eligible bank'' 
with only a technical clarification that the definition applies to the 
self-certification process.
    The NPRM also clarified that a national bank that is at least 
adequately capitalized and that has a composite rating of at least 3 
with improving trends may submit a letter to the OCC's Community 
Development Division requesting permission to self-certify investments. 
The OCC received no comments on this clarification. Accordingly, the 
final rule permits a national bank that is at least adequately 
capitalized and that has a composite rating of at least 3 with 
improving trends to submit a letter to the OCC's Community Development 
Division requesting permission to self-certify investments.
    In addition, in a change from the former rule, the NPRM proposed 
permitting a bank that is subject to a current OCC enforcement action 
to seek permission to self-certify investments. As explained in the 
preamble to the NPRM, the OCC believes this modification is appropriate 
in light of the final rule's expanded self-certification opportunities 
for banks (See Sec. 24.6.) Accordingly, the final rule adopts this 
change.
    In addition, the NPRM proposed changing the definition of 
``significant risk to the deposit insurance fund'' to include risk to 
all Federal deposit insurance funds. The OCC received no comments on 
this proposed section and, accordingly, adopts the proposed change.
    Finally, the NPRM proposed making two changes concerning the small 
business definitions in former part 24. First, the NPRM proposed 
removing the definition of ``minority-owned small businesses'' because 
these businesses are encompassed by the regulation's provisions 
concerning all small businesses. Second, the NPRM proposed updating the 
citation to the Small Business Administration regulations referenced in 
the definition of ``small businesses'' in the former regulation. The 
OCC received no comments on these proposed changes and, accordingly, 
adopts them with the clarification that the definition of ``small 
business'' includes minority-owned small business.

Public Welfare Investments (Sec. 24.3)

    Former part 24 delineated a public welfare test that consisted of 
four requirements. Under former Sec. 24.4, an investment in a CDC or CD 
Project was designed primarily to promote the public welfare only if: 
(1) the investment primarily benefited low- and moderate-income persons 
and families or small businesses; (2) the investment addressed 
community development needs not met by the private market in one or 
more communities served by the bank; (3) there was nonbank community 
involvement in the CDC or CD Project; and (4) the profits and 
distributions from a CDC or CD Project were reinvested in activities 
that primarily promote the public welfare.1
---------------------------------------------------------------------------

     1 On December 28, 1995, the OCC published a final rule 
eliminating part 24's reinvestment requirement. 60 FR 67049.
---------------------------------------------------------------------------

    Based on the OCC's experience since it adopted part 24, the NPRM 
proposed replacing the public welfare test with modified criteria for 
determining whether an investment primarily promotes the public 
welfare. That list retained the first element of the public welfare 
test, the requirement for a primary benefit to low- and moderate-income 
individuals or small businesses, but made clear that this benefit could 
be provided in a variety of ways. For example, Sec. 24.3(a) of the NPRM 
permitted banks to invest in affordable housing, community 
revitalization projects, small business financing or ``other 
activities, services, or facilities conducive to the public welfare.'
    The list of public welfare investment criteria also modified the 
private market financing and community involvement elements of the 
current public welfare test. Proposed Sec. 24.3(b) required a bank to 
demonstrate only that it was difficult, rather than impossible, to 
obtain private market financing. Section 24.3(c) of the proposal also 
required a bank to demonstrate community support for or participation 
in a proposed investment, but, unlike the former rule, it did not 
prescribe any particular method of demonstrating that support or 
participation.2
---------------------------------------------------------------------------

    \2\ The former rule required a bank to demonstrate nonbank 
community involvement in a CDC or CD project by indicating support 
from the affected primary beneficiaries and representatives of local 
government. In the case of a CD entity with a board of directors, a 
bank was required to demonstrate such support by the composition of 
the organization's board of directors.
---------------------------------------------------------------------------

    In addition, Sec. 24.3(d) of the NPRM permitted a bank to make an 
investment that also benefitted an area outside those where the bank 
provides its core banking services. However, the bank would still have 
been required to demonstrate the extent to which its investment 
benefits the communities where it provides these services. These 
proposed revisions to the public welfare test reflected the OCC's 
willingness to consider a wider range of public welfare investments 
than under the former rule.
    All but one of the commenters voiced strong support for the 
proposed revisions to the public welfare test. The objecting commenter, 
a national non-profit organization that provides support for local non-
profit CDCs, strongly supported the former rule and expressed concern 
that the proposal undermines the intent of 12 U.S.C. 24(Eleventh), 
because the revised criteria would discourage banks from taking on 
difficult community development projects, such as those targeted to 
low- and moderate-income areas where private market financing is 
difficult to obtain. The OCC appreciates these concerns and has 
modified Sec. 24.3 to clarify that investments must benefit low- and 
moderate-income individuals, low- and moderate-income areas, or other 
areas targeted for redevelopment by local, state, tribal or Federal 
government. The OCC has also modified Sec. 24.3 to require that a bank 
demonstrate that it is not reasonably practicable to obtain other 
private market financing for a proposed investment. In addition, the 
OCC agrees with the commenter's opinion that the phrase ``conducive to 
the public welfare'' in proposed Sec. 24.3(a)(4) could be 
misinterpreted by some readers as a lowering of the statutory 
requirement that banks' investments must ``primarily promote the public 
welfare.'' Accordingly, the OCC has revised Sec. 24.3(a)(4) to clarify 
that all investments under this part must primarily promote the public 
welfare.
    Two commenters, although supportive of the proposed changes to the 
community participation requirement, requested that the final rule 
include a list of examples for demonstrating community support for, or 
participation in, a proposed investment. Based on these comments, the 
OCC has revised the community participation criterion to include the 
following examples:
     In the case of an investment in a CD entity with a board 
of directors, representation on the board of directors by non-bank 
community representatives with expertise relevant to the proposed 
investment;
     Establishment of an advisory board for the bank's 
community development activities that includes non-bank community 
representatives with expertise relevant to the proposed investment;

[[Page 49657]]

     Formation of a formal business relationship with a 
community-based organization in connection with the proposed 
investment;
     Contractual agreements with community partners to provide 
services in connection with the proposed investment;
     Joint ventures with local small businesses in the proposed 
investment; and
     Financing for the proposed investment from the public 
sector or community development organizations.
    The OCC emphasizes, however, that these examples are by no means 
exhaustive; banks and their community partners may determine other 
acceptable ways to demonstrate community support for, or participation 
in, investments under this part.
    To improve clarity, the final rule reverses the order of the 
sections concerning community participation and benefit to communities 
otherwise served by the bank. Thus, the community participation section 
is now set forth at Sec. 24.3(d) of the final rule, and the section 
concerning benefit to communities otherwise served by the bank is set 
forth at Sec. 24.3(c).
    Finally, the NPRM proposed removing as unnecessary former 
Sec. 24.4(e), which provided that a bank must manage its CDC and CD 
Project investments in a prudent manner. The OCC received no comments 
on the proposed removal and, accordingly, adopts the proposed change. 
This change streamlines the regulation and, of course, reflects no 
change in the applicable standard that national banks must manage their 
part 24 investments--as with all their investments--consistent with 
safe and sound banking practices.

Investment Limits (Sec. 24.4)

    The former rule contained investment limit provisions at 
Sec. 24.4(b) and (d). For ease of reference, the NPRM grouped the 
provisions concerning part 24 investment limits into a separately 
titled section. Section 24.4(a) of the NPRM clarified that, as provided 
in 12 U.S.C. 24(Eleventh), a bank's aggregate outstanding investments 
under part 24 may not exceed 5 percent of its capital and surplus 
unless the bank is at least adequately capitalized and the OCC 
determines, by written approval of a proposed investment, that a higher 
amount, up to 10 percent, will pose no significant risk to the deposit 
insurance fund.
    One commenter suggested that the final rule permit an adequately 
capitalized bank with assets up to $150 million to commit up to ten 
percent of its capital and surplus to part 24 investments. As explained 
earlier, however, the statute requires a bank to seek OCC approval of 
investments that exceed 5 percent of capital. Accordingly, the OCC 
adopts the statutory limitation proposed in the NPRM.

Public Welfare Investment Self-Certification and Prior Approval 
Procedures (Sec. 24.5)

    The NPRM proposed changes to the self-certification and prior 
approval procedures set forth in Sec. 24.11 of the former rule. Former 
Sec. 24.11 provided three processes for approval of authorized 
investments. The first required a bank to file an investment proposal, 
which the OCC usually approved or disapproved within 30 days. The 
second process consisted of a five-day review period by the OCC for 
investment proposals that the OCC had previously approved for another 
bank. The third was a self-certification process for certain 
investments, under which a bank filed a notice with the OCC within 10 
days after it makes an investment, and the OCC sent a confirmation of 
receipt within five days.
    The NPRM proposed eliminating the second approval process. Thus, 
under Sec. 24.5(a) and Sec. 24.6(a) of the NPRM, a bank would be 
permitted to self-certify an investment previously approved by the OCC 
for another bank. The preamble to the NPRM further provided that the 
OCC will continue its practice of sending a simple confirmation of 
receipt of a bank's self-certification notice within five days. The 
NPRM also made clear that the OCC will not retroactively review a self-
certified investment proposal, but simply will review the self-
certification documents to ensure that they meet the self-certification 
requirements set forth in Sec. 24.5(a). The OCC received no comments on 
the proposed elimination of the approval process for investments 
previously approved by the OCC for another bank and, accordingly, 
adopts this change.
    Section 24.5(b) of the NPRM sets forth the prior approval 
procedures for investment proposals that do not qualify for self-
certification.3 In considering a bank's investment proposal under 
the NPRM, the OCC will consider whether the investment satisfies the 
requirements of Sec. 24.3 and whether it is consistent with the bank's 
safe and sound operation and the OCC's policies. As explained in the 
NPRM's preamble, the OCC will continue its practice of sending a simple 
confirmation of receipt of an investment proposal within five days. 
Consistent with the former rule, the NPRM permitted a bank, unless 
notified otherwise by the OCC, to make a proposed investment 30 
calendar days after the date on which the OCC received the bank's 
investment proposal. The NPRM further provided that the OCC may notify 
the bank that it is extending the review period. If so notified, the 
bank could make the investment only with the OCC's written approval. 
One commenter suggested that the final rule require that, within 30 
days of the OCC's receipt of a bank's investment proposal, the OCC 
notify the bank of the proposal's status by facsimile or telephone. The 
OCC declines to include this level of detail in the final rule but will 
endeavor to notify banks of proposal status as quickly as possible. 
Accordingly, the OCC adopts the proposed procedures for prior approval 
of investment proposals.
---------------------------------------------------------------------------

     3  The NPRM proposed removing the former rule's provision 
for optional review as unnecessary. The OCC received no comments on 
this proposed removal, and accordingly adopts the proposed change. A 
national bank may, however, continue to request prior OCC review and 
approval of any investment proposal, including one that qualifies 
for self-certification.
---------------------------------------------------------------------------

    Former rule Sec. 24.11(b) contained a limit on the size of 
investments eligible for self-certification by banks with more than 
$250 million in assets. Those banks were required to seek prior OCC 
approval for investments that exceeded the lesser of 2 percent of their 
unimpaired capital and surplus or $10 million. The NPRM proposed 
removing this additional limitation in light of the proposed new 
standards that define the banks eligible to use the self-certification 
process (discussed earlier). The OCC received no comments on this 
proposed removal and, accordingly, the final rule adopts the proposed 
change.

Investments Eligible for Self-Certification (Sec. 24.6)

    Section 24.6 of the NPRM proposed replacing former rule Sec. 24.13, 
which limited self-certification to investments using certain 
structures as well as certain activities. These structures included 
multi-bank CDCs; CDCs established by state or local government; 
community-based organizations; and certain community development 
limited partnerships. A CDC subsidiary was not an eligible structure 
for self-certification.
    The OCC believes that a structure-based self-certification 
limitation is no longer necessary. This limitation was intended to 
allow the OCC to ensure that particular investments did not expose 
banks to safety and soundness risks or unlimited liability, 
particularly relating to then-novel structures, such as limited 
liability companies and CD

[[Page 49658]]

banks. However, since self-certification is limited to eligible banks 
(as defined in Sec. 24.2(e) of the final rule), the OCC believes it is 
reasonable to rely on bank management to determine the appropriate 
structures for part 24 investments. The OCC received no comments on the 
proposed elimination of the list of eligible structures and, 
accordingly, adopts the proposed change.
    In addition to eliminating the list of eligible structures, 
Sec. 24.6(a) of the NPRM proposed an expanded list of activities 
eligible for self-certification to reflect the industry's innovation in 
part 24 investing and the OCC's experience with self-certification 
under part 24. Part 24's self-certification provisions encourage 
community development and other public welfare investments by banks by 
reducing the regulatory steps associated with making the investments. 
In order to maximize the use of self-certification as an incentive for 
banks to make investments that primarily promote the public welfare, 
and to encourage banks' creativity in making these investments, the OCC 
identified in proposed Sec. 24.6(a) a clear and expanded list of 
eligible activities. In addition to the former rule's list of eligible 
activities, the NPRM's list included, but was not limited to, certain 
investments that benefit low- and moderate-income persons and small 
businesses, investments that previously have been determined by the OCC 
to be permissible under part 24, and investments previously approved by 
the Federal Reserve Board (FRB) under 12 CFR 208.21 for state member 
banks.
    One commenter suggested several changes to the proposed list of 
activities eligible for self-certification. The commenter recommended 
deleting from the list investments in an entity that acquires housing 
for low- and moderate-income persons. The OCC believes, however, that 
this activity, which was eligible for self-certification under the 
former rule, promotes the public welfare and that permitting self-
certification of such investments is therefore consistent with the 
statute and accordingly declines to remove it from the proposed list. 
The commenter also requested that the list clarify that a bank may 
self-certify investments as a limited partner, or as a partner in an 
entity that it itself a limited partner, in a project with a general 
partner that is, or is primarily owned and operated by, a 26 U.S.C. 
501(c) (3) or (4) non-profit corporation and that qualifies for the 
Federal low-income housing tax credit. The OCC agrees with this 
suggestion and accordingly adopts the proposed clarification.
    In addition, the commenter suggested that the final rule bar from 
self-certification any bank that self-certifies an investment the OCC 
later determines was ineligible for self-certification. The OCC 
believes that this concern is addressed by the remedial action 
provisions of proposed Sec. 24.7(c). Finally, the commenter objected to 
the proposed inclusion of investments of a type approved by the FRB in 
the list of eligible activities. The OCC believes that national banks 
and the beneficiaries of their investments will benefit by the 
increased flexibility and reduced burden associated with this 
provision, but agrees that no investment can be self-certified, even if 
that type of investment has been approved by the FRB, unless it meets 
the criteria for public welfare investments set forth in Sec. 24.3. 
Accordingly, this provision has been modified in the final rule.
    As discussed earlier, the OCC has modified Sec. 24.3 to require 
that bank investments be targeted to low- and moderate-income 
individuals, low- and moderate-income areas, or other areas targeted 
for redevelopment. The OCC has decided, however, to modify the list of 
activities eligible for self-certification proposed in Sec. 24.6(a) of 
the NPRM to clarify that a bank may self-certify an investment only if 
it primarily benefits low- and moderate-income individuals or areas. 
National banks must therefore submit for prior approval by the OCC 
proposals for other types of investments. The distinction between what 
is a permissible investment under Sec. 24.3 and what is eligible for 
self-certification under Sec. 24.6 reflects the OCC's view that 
investments targeted to low- and moderate-income individuals or areas 
necessarily primarily promote the public welfare. Other types of 
investments may primarily promote the public welfare also, but the OCC 
believes that some prior review of such investments is an appropriate 
means to ensure that they satisfy the criteria set forth in Sec. 24.3. 
Accordingly, the OCC adopts the list of eligible activities proposed in 
Sec. 24.6(a) of the NPRM with two modifications. The first modification 
limits self-certification to investments that benefit low- and 
moderate-income individuals or areas; and the second modification 
reflects the commenter's suggestion concerning limited partnerships 
investments.4
---------------------------------------------------------------------------

     4  In response to another commenter, the OCC clarifies that 
permissible investments in a rural community in which a bank has its 
main office or branch may be self-certified.
---------------------------------------------------------------------------

    Notwithstanding the activities eligible for self-certification 
listed in Sec. 24.6(a), Sec. 24.6(b) of the NPRM provided that a bank 
may not self-certify investments that involve properties carried on the 
bank's books as ``other real estate owned'' (OREO properties) or that 
fund projects outside the states or metropolitan areas in which the 
bank's main office or branches are located. The latter limitation is 
similar to the limit on self-certification that appears in former part 
24 but was revised in the NPRM to reflect that some national banks now 
have branches in more than one state. One commenter suggested that the 
final rule permit self-certification of investments in portfolio 
projects, such as regional funds that invest in affordable housing 
projects located in several states, where no more than 25 percent of 
the affordable housing projects are located outside the states or 
metropolitan areas served by the bank. The OCC agrees that a bank 
should not be discouraged from investing in innovative projects that 
primarily benefit the communities it serves because a small portion of 
the investment benefits other areas. Accordingly, under the final rule, 
a bank may not self-certify an investment where more than 25 percent of 
the investment funds projects in a state or metropolitan area other 
than the states or metropolitan areas in which the bank maintains its 
main office or branches. If a portion of a bank's investment funds 
projects in areas outside of those in which the bank maintains its main 
office or branches, the bank must certify under Sec. 24.5(a)(3)(vii) 
that no more than 25 percent of the investment funds projects in a 
state or metropolitan area other than the states or metropolitan areas 
in which the bank maintains its main office or branches.

Examination, Records, and Remedial Action (Sec. 24.7)

    The NPRM proposed replacing former Sec. 24.21, which set forth the 
former rule's examination, records, and remedial action provisions, 
with proposed Sec. 24.7 without substantive change. The OCC received no 
comments on this proposed revision, and accordingly adopts the proposed 
change.

Accounting for Public Welfare Investments (Current Sec. 24.4(c))

    Section 24.4(c) of the former rule provided that a bank's 
investments in CDCs and CD Projects generally could be recorded as 
``other assets at cost.'' The former rule also set forth circumstances 
under which a bank would be required to consolidate its investments on 
a line-by-line basis or account for them under the equity method of 
accounting. The NPRM proposed eliminating this section as

[[Page 49659]]

unnecessary, because banks generally look to other sources for their 
accounting instructions. The OCC received no comments on this proposed 
removal, and accordingly adopts the proposed change. Banks should 
record their investments, as appropriate, pursuant to the instructions 
for Consolidated Reports of Condition and Income published by the 
Federal Financial Institutions Examination Council.

Policy Issue Regarding Dual Sources of Authority

    In the past, the OCC has not used 12 U.S.C. 24(Eleventh), as 
implemented by part 24, to approve activities permissible under other 
provisions of the National Bank Act, 12 U.S.C. 1 et seq. This position 
was intended to prevent banks' activities from being subjected 
unnecessarily to part 24's limitation on the amount of capital a bank 
may commit to community development and public welfare investments. For 
example, a bank could make certain affordable housing loans under both 
12 U.S.C. 24(Seventh) and 24(Eleventh). If the bank made such a loan 
under the authority of 24(Eleventh), the loan would be subject to a 
capital limitation that is stricter than the generally applicable 
lending limits. Because the bank would have used unnecessarily some of 
its limited part 24 authority to make a loan that is also permissible 
under 24(Seventh), the bank would be left with less capital to commit 
to investments that are permissible only under part 24. Therefore, the 
OCC would usually conclude that 24(Seventh) provided the authority for 
the loan. This position, however, does not reflect the OCC's general 
approach of allowing banks to decide how best to structure their 
investments.
    The NPRM requested comment on whether the OCC should continue its 
policy of not using part 24 as a basis for approving activities 
otherwise permissible under the National Bank Act. One commenter opined 
that part 24 provides limited authority that should be restricted only 
to those activities motivated by concern for the public welfare, rather 
than regular business considerations. The OCC believes that part 24 
affords banks the opportunity to implement activities that supplement 
and enhance otherwise permissible activities but may, in some cases, 
provide authority that overlaps with other authority under the National 
Bank Act. The OCC has decided that, where a choice is available, a bank 
will be permitted to choose whether an investment activity will be 
undertaken pursuant to authority under 24(Seventh) or 24(Eleventh). 
When a bank seeks to rely on 24(Eleventh), however, the OCC will advise 
the bank that the proposed investment is permissible under both 
authorities to ensure that the bank is aware of the full range of its 
legal investment opportunities and of the effect of the applicable 
investment limitations.

Derivation Table

    This table directs readers to the provision(s) of the current 
regulation, if any, upon which the proposed provision is based.

----------------------------------------------------------------------------------------------------------------
         Revised section                          Original section                           Comments           
----------------------------------------------------------------------------------------------------------------
Sec.  24.1.......................  Sec.  24.1...................................  Modified.                     
Sec.  24.2(a)....................  Sec.  24.2(a)................................  Modified.                     
    (b)..........................  Sec.  24.2(m)................................  Substantial change.           
    (c)..........................  Sec.  24.2(b)................................  Modified.                     
    (d)..........................  Sec.  24.2(e)................................  Modified.                     
    (e)..........................  .............................................  Added.                        
    (f)..........................  Sec.  24.2 (g) ,(h)..........................  Substantial change.           
    (g)..........................  Sec.  24.2(k)................................  Modified.                     
    (h)..........................  Sec.  24.2(l)................................  Modified.                     
                                   Sec.  24.2(c)................................  Removed.                      
                                   Sec.  24.2(d)................................  Removed.                      
                                   Sec.  24.2(f)................................  Removed.                      
                                   Sec.  24.2(i)................................  Removed.                      
    (i)..........................  Sec.  24.2(a)................................  Modified.                     
                                   Sec.  24.2(j)................................  Removed.                      
Sec.  24.3.......................  Sec.  24.4(a)................................  Substantial change.           
Sec.  24.4.......................  Sec.  24.4 (b), (d)..........................  Modified.                     
                                   Sec.  24.4(c)................................  Removed.                      
                                   Sec.  24.4(e)................................  Removed.                      
Sec.  24.5(a)....................  Sec.  24.11(a)...............................  Substantial change.           
    (b)..........................  Sec.  24.11 (b), (d), (e)....................  Substantial change.           
                                   Sec.  24.11(c)...............................  Removed.                      
Sec.  24.6(a)....................  Sec.  24.13(b)...............................  Substantial change.           
    (b)..........................  Sec.  24.11(b)...............................  Modified.                     
                                   Sec.  24.13(a)...............................  Removed.                      
Sec.  24.7.......................  Sec.  24.21..................................  Modified.                     
----------------------------------------------------------------------------------------------------------------

Regulatory Flexibility Act

    It is hereby certified that this final rule will not have a 
significant economic impact on a substantial number of small entities. 
Accordingly, a regulatory flexibility analysis is not required. This 
final rule will reduce the regulatory burden on national banks, 
regardless of size, by replacing part 24's public welfare test with 
modified criteria for determining whether an investment promotes the 
public welfare, streamlining the self-certification and prior approval 
sections of the rule, and eliminating unnecessary provisions. Although 
beneficial, these changes will not have a material impact on affected 
banks.

Executive Order 12866

    The OCC has determined that this final rule is not a significant 
regulatory action under Executive Order 12866.

[[Page 49660]]

Unfunded Mandates

    The OCC has determined that this final rule will not result in 
expenditures by state, local and tribal governments, or by the private 
sector, of more than $100 million in any one year. Accordingly, a 
budgetary impact statement is not required under section 202 of the 
Unfunded Mandates Reform Act of 1995.

Paperwork Reduction Act of 1995

    The collection of information requirements in this final rule are 
found in 12 CFR 24.5. This information is required for the public 
welfare investment self-certification and prior approval procedures. 
The likely respondents are national banks.
    Estimated average annual burden hours per respondent: 1.05 hours.
    Estimated number of respondents: 400.
    Estimated total annual reporting burden: 418 hours.
    Start-up costs to respondents: None.

List of Subjects in 12 CFR Part 24

    Community development, Credit, Investments, National banks, 
Reporting and recordkeeping requirements.

Authority and Issuance

    For the reasons set forth in the preamble, the OCC amends title 12, 
chapter I, part 24, of the Code of Federal Regulations as set forth 
below.

PART 24--COMMUNITY DEVELOPMENT CORPORATIONS, COMMUNITY DEVELOPMENT 
PROJECTS, AND OTHER PUBLIC WELFARE INVESTMENTS

Sec.
24.1  Authority, purpose, and OMB control number.
24.2  Definitions.
24.3  Public welfare investments.
24.4  Investment limits.
24.5  Public welfare investment self-certification and prior 
approval procedures.
24.6  Activities eligible for self-certification.
24.7  Examination, records, and remedial action.

    Authority: 12 U.S.C. 24(Eleventh), 93a, 481 and 1818.

Sec. 24.1  Authority, purpose, and OMB control number.

    (a) Authority: The Office of the Comptroller of the Currency (OCC) 
issues this part pursuant to its authority under 12 U.S.C. 
24(Eleventh), 93a, and 481.
    (b) Purpose. This part implements 12 U.S.C. 24(Eleventh), which 
authorizes national banks to make investments designed primarily to 
promote the public welfare, including the welfare of low- and moderate-
income areas or individuals, such as by providing housing, services, or 
jobs. It is the OCC's policy to encourage national banks to make 
investments described in Sec. 24.3, consistent with safety and 
soundness. The OCC believes that national banks can promote the public 
welfare through a variety of investments, including those in community 
development corporations (CDCs) and community development projects (CD 
Projects) that develop affordable housing, foster revitalization or 
stabilization of low- and moderate-income areas or other areas targeted 
for redevelopment by local, state, tribal or Federal government, or 
provide equity or debt financing for small businesses that are located 
in such areas or that produce or retain permanent jobs for low- and 
moderate-income persons. This part provides:
    (1) The standards that the OCC uses to determine whether an 
investment is designed primarily to promote the public welfare; and
    (2) The procedures that apply to these investments.
    (c) OMB control number. The collection of information requirements 
contained in this part were approved by the Office of Management and 
Budget under OMB control number 1557-0194.

Sec. 24.2  Definitions.

    For purposes of this part, the following definitions apply:
    (a) Adequately capitalized has the same meaning as adequately 
capitalized in 12 CFR 6.4.
    (b) Capital and surplus means:
    (1) A bank's Tier 1 and Tier 2 capital calculated under the OCC's 
risk-based capital standards set out in Appendix A to 12 CFR part 3 as 
reported in the bank's Consolidated Report of Condition and Income as 
filed under 12 U.S.C. 161; plus
    (2) The balance of a bank's allowance for loan and lease losses not 
included in the bank's Tier 2 capital, for purposes of the calculation 
of risk-based capital under Appendix A to 12 CFR part 3, as reported in 
the bank's Consolidated Report of Condition and Income as filed under 
12 U.S.C. 161.
    (c) Community development corporation (CDC) means a corporation 
established by one or more insured financial institutions, or by 
insured financial institutions and other investors, to make one or more 
investments that meet the requirements of Sec. 24.3.
    (d) Community development Project (CD Project) means a project to 
make an investment that meets the requirements of Sec. 24.3.
    (e) Eligible bank means, for purposes of Sec. 24.5, a national bank 
that:
    (1) Is well capitalized;
    (2) Has a composite rating of 1 or 2 under the Uniform Financial 
Institutions Rating System;
    (3) Has a Community Reinvestment Act (CRA) rating of 
``Outstanding'' or ``Satisfactory''; and
    (4) Is not subject to a cease and desist order, consent order, 
formal written agreement, or Prompt Corrective Action directive (see 12 
CFR part 6, subpart B) or, if subject to any such order, agreement or 
directive, is informed in writing by the OCC that the bank may be 
treated as an ``eligible bank'' for purposes of this part.
    (f) Low-income and moderate-income have the same meanings as ``low-
income'' and ``moderate-income'' in 12 CFR 25.12(n).
    (g) Significant risk to the deposit insurance fund means a 
substantial probability that any Federal deposit insurance fund could 
suffer a loss.
    (h) Small business means a business, including a minority-owned 
small business, that meets the qualifications for Small Business 
Administration Development Company or Small Business Investment Company 
loan programs in 13 CFR 121.301.
    (i) Well capitalized has the same meaning as well capitalized in 12 
CFR 6.4.

Sec. 24.3  Public welfare investments.

    A national bank may make an investment under this part if:
    (a) The investment primarily benefits low- and moderate-income 
individuals, low- and moderate-income areas, or other areas targeted 
for redevelopment by local, state, tribal or Federal government 
(including Federal enterprise communities and Federal empowerment 
zones) by providing or supporting one or more of the following 
activities:
    (1) Affordable housing, community services, or permanent jobs for 
low- and moderate-income individuals;
    (2) Equity or debt financing for small businesses;
    (3) Area revitalization or stabilization; or
    (4) Other activities, services, or facilities that primarily 
promote the public welfare;
    (b) The bank demonstrates that it is not reasonably practicable to 
obtain other private market financing for the proposed investment;
    (c) The bank demonstrates the extent to which the investment 
benefits communities otherwise served by the bank; and
    (d) The bank demonstrates non-bank community support for or 
participation

[[Page 49661]]

in the investment. Community support or participation may be 
demonstrated in a variety of ways, including but not limited to:
    (1) In the case of an investment in a CD entity with a board of 
directors, representation on the board of directors by non-bank 
community representatives with expertise relevant to the proposed 
investment;
    (2) Establishment of an advisory board for the bank's community 
development activities that includes non-bank community representatives 
with expertise relevant to the proposed investment;
    (3) Formation of a formal business relationship with a community-
based organization in connection with the proposed investment;
    (4) Contractual agreements with community partners to provide 
services in connection with the proposed investment;
    (5) Joint ventures with local small businesses in the proposed 
investment; and
    (6) Financing for the proposed investment from the public sector or 
community development organizations.

Sec. 24.4  Investment limits.

    (a) Limit on aggregate outstanding investments. A national bank's 
aggregate outstanding investments under this part may not exceed 5 
percent of its capital and surplus, unless the bank is at least 
adequately capitalized and the OCC determines, by written approval of 
the bank's proposed investment(s), that a higher amount will pose no 
significant risk to the deposit insurance fund. In no case may a bank's 
aggregate outstanding investments under this part exceed 10 percent of 
its capital and surplus.
    (b) Limited liability. A national bank may not make an investment 
under this part that would expose the bank to unlimited liability.

Sec. 24.5  Public welfare investment self-certification and prior 
approval procedures.

    (a) Self-certification of public welfare investments. (1) Subject 
to Sec. 24.4(a), an eligible bank may make an investment described in 
Sec. 24.6(a) without prior notification to, or approval by, the OCC if 
the bank follows the self-certification procedures prescribed in this 
section.
    (2) To self-certify an investment, an eligible bank shall submit, 
within 10 working days after it makes an investment, a letter of self-
certification to the Director, Community Development Division, Office 
of the Comptroller of the Currency, Washington, DC 20219.
    (3) The bank's letter of self-certification must include:
    (i) The name of the CDC, CD Project, or other entity in which the 
bank has invested;
    (ii) The date the investment was made;
    (iii) The type of investment (equity or debt), the investment 
activity listed in Sec. 24.6(a) that the investment supports, and a 
brief description of the particular investment;
    (iv) The amount of the bank's total investment in the CDC, CD 
Project or other entity, and the bank's aggregate outstanding 
investments under this part, including commitments and the investment 
being self-certified;
    (v) The percentage of the bank's capital and surplus represented by 
the bank's aggregate outstanding investments under this part, including 
commitments and the investment being self-certified;
    (vi) A statement certifying compliance with the requirements of 
Sec. 24.3 and Sec. 24.4; and
    (vii) If a portion of the investment funds projects outside of the 
areas in which the bank maintains its main office or branches, a 
statement certifying that no more than 25 percent of the investment 
funds projects in a state or metropolitan area other than the states or 
metropolitan areas in which the bank maintains its main office or 
branches.
    (4) A national bank that is not an eligible bank but that is at 
least adequately capitalized, and has a composite rating of at least 3 
with improving trends under the Uniform Financial Institutions Rating 
System, may submit a letter to the Community Development Division 
requesting authority to self-certify investments. The Community 
Development Division considers these requests on a case-by-case basis.
    (b) Investments requiring prior approval. (1) If a national bank or 
its proposed investment does not meet the requirements for self-
certification set forth in paragraph (a) of this section, the bank 
shall submit a proposal for an investment to the Director, Community 
Development Division, Office of the Comptroller of the Currency, 
Washington, DC 20219.
    (2) The bank's investment proposal must include:
    (i) The name of the CDC, CD Project, or other entity in which the 
bank intends to invest;
    (ii) The date on which the bank intends to make the investment;
    (iii) The type of investment (equity or debt), the investment 
activity listed in Sec. 24.3(a) that the investment supports, and a 
description of the particular investment;
    (iv) The amount of the bank's total investment in the CDC, CD 
Project or other entity, and the bank's aggregate outstanding 
investments under this part (including commitments and the investment 
being proposed);
    (v) The percentage of the bank's capital and surplus represented by 
the bank's aggregate outstanding investments under this part (including 
commitments and the investment being proposed); and
    (vi) A statement certifying compliance with the requirements of 
Sec. 24.3 and Sec. 24.4.
    (3) In reviewing a proposal, the OCC considers the following 
factors and other available information:
    (i) Whether the investment satisfies the requirements of Sec. 24.3 
and Sec. 24.4;
    (ii) Whether the investment is consistent with the safe and sound 
operation of the bank; and
    (iii) Whether the investment is consistent with the requirements of 
this part and the OCC's policies.
    (4) Unless otherwise notified in writing by the OCC, and subject to 
Sec. 24.4(a), the proposed investment is deemed approved after 30 
calendar days from the date on which the OCC receives the bank's 
investment proposal.
    (5) The OCC, by notifying the bank, may extend its period for 
reviewing the investment proposal. If so notified, the bank may make 
the investment only with the OCC's written approval.
    (6) The OCC may impose one or more conditions in connection with 
its approval of an investment under this part. All approvals are 
subject to the condition that a national bank must conduct the approved 
activity in a manner consistent with any published guidance issued by 
the OCC regarding the activity.

Sec. 24.6   Activities eligible for self-certification.

    (a) Eligible activities. In accordance with the process described 
in Sec. 24.5(a), a bank may self-certify the following investments 
without prior notice to, or approval by, the OCC:
    (1) Investments in an entity that finances, acquires, develops, 
rehabilitates, manages, sells, or rents housing primarily for low- and 
moderate-income individuals;
    (2) Investments that finance small businesses (including equity or 
debt financing and investments in an entity that provides loan 
guarantees) that are located in low- and moderate-income areas or that 
produce or retain permanent jobs, the majority of which are held by 
low- and moderate-income individuals;
    (3) Investments that provide credit counseling, job training, 
community

[[Page 49662]]

development research, and similar technical assistance services for 
non-profit community development organizations, low- and moderate-
income individuals or areas, or small businesses located in low- and 
moderate-income areas or that produce or retain permanent jobs, the 
majority of which are held by low- and moderate-income individuals;
    (4) Investments in an entity that acquires, develops, 
rehabilitates, manages, sells, or rents commercial or industrial 
property that is located in a low- and moderate-income area and 
occupied primarily by small businesses, or that is occupied primarily 
by small businesses that produce or retain permanent jobs, the majority 
of which are held by low- and moderate-income individuals;
    (5) Investments as a limited partner, or as a partner in an entity 
that is itself a limited partner, in a project with a general partner 
that is, or is primarily owned and operated by, a 26 U.S.C. 501(c) (3) 
or (4) non-profit corporation and that qualifies for the Federal low-
income housing tax credit;
    (6) Investments in low- and moderate-income areas that produce or 
retain permanent jobs, the majority of which are held by low- and 
moderate-income individuals;
    (7) Investments in a national bank that has been approved by the 
OCC as a national bank with a community development focus;
    (8) Investments of a type approved by the Federal Reserve Board 
under 12 CFR 208.21 for state member banks that are consistent with the 
requirements of Sec. 24.3; and
    (9) Investments of a type previously determined by the OCC to be 
permissible under this part.
    (b) Ineligible activities. Notwithstanding the provisions of this 
section, a bank may not self-certify an investment if:
    (1) The investment involves properties carried on the bank's books 
as ``other real estate owned'';
    (2) More than 25 percent of the investment funds projects in a 
state or metropolitan area other than the states or metropolitan areas 
in which the bank maintains its main office or branches; or
    (3) The OCC determines, in published guidance, that the investment 
is inappropriate for self-certification.

Sec. 24.7   Examination, records, and remedial action.

    (a) Examination. National bank investments under this part are 
subject to the examination provisions of 12 U.S.C. 481.
    (b) Records. Each national bank shall maintain in its files 
information adequate to demonstrate that it is in compliance with the 
requirements of this part.
    (c) Remedial action. If the OCC finds that an investment under this 
part is in violation of law or regulation, is inconsistent with the 
safe and sound operation of the bank, or poses a significant risk to a 
Federal deposit insurance fund, the national bank shall take 
appropriate remedial action as determined by the OCC.

    Dated: September 13, 1996.
Eugene A. Ludwig,
Comptroller of the Currency.
[FR Doc. 96-23986 Filed 9-20-96; 8:45 am]
BILLING CODE 4810-33-P

Complete official Federal Register PDF

FR Doc. 96-23796 Federal Motor Vehicle Safety Standards; Stability and Control of Medium and Heavy Vehicles During Braking
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49691-49696]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23796]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
National Highway Traffic Safety Administration

49 CFR Part 571

[Docket No. 92-29; Notice 11]
RIN 2127-AG06

Federal Motor Vehicle Safety Standards; Stability and Control of 
Medium and Heavy Vehicles During Braking

AGENCY: National Highway Traffic Safety Administration (NHTSA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document amends Standard No. 121, Air Brake Systems, to 
specify the location, labeling, color, activation protocol, and 
photometric intensity of antilock brake system (ABS) malfunction 
indicator lamps on the exterior of trailers and trailer converter 
dollies. The purpose of the malfunction indicator lamp is to inform 
drivers, and maintenance and inspection personnel, of malfunctions in a 
trailer's ABS.

DATES: Effective dates. The amendments to 49 CFR 571.121 are effective 
March 1, 1997.
    Compliance dates. Compliance with the amendments to paragraph 
S5.2.3.3 (b) will be required on and after March 1, 1998.
    Incorporation by reference. The incorporation by reference of a 
publication listed in the regulation is approved by the Director of the 
Federal Register as of March 1, 1997.
    Petitions for reconsideration. Any petitions for reconsideration of 
this rule must be received by NHTSA no later than November 7, 1996.

[[Page 49692]]

ADDRESSES: Petitions for reconsideration of this rule should refer to 
the above referenced docket numbers and should be submitted to: 
Administrator, National Highway Traffic Safety Administration, 400 
Seventh Street, S.W., Washington, D.C. 20590.

FOR FURTHER INFORMATION CONTACT: For non-legal issues: Mr. Robert M. 
Clarke, Office of Crash Avoidance, National Highway Traffic Safety 
Administration, 400 Seventh Street, SW., Washington, D.C. 20590 (202) 
366-5278.
    For legal issues: Mr. Marvin L. Shaw, NCC-20, Rulemaking Division, 
Office of Chief Counsel, National Highway Traffic Safety 
Administration, 400 Seventh Street, SW., Washington, D.C. 20590 (202) 
366-2992.

SUPPLEMENTARY INFORMATION:

I. Background
II. Petitions for Reconsideration and Notice of Proposed Rulemaking
III. Comments on the December NPRM
IV. Agency Decision
    A. General Considerations
    B. Location
    C. Color
    D. Activation Protocol
    E. Intensity and Photometric Requirements
V. Costs
VI. Rulemaking Analyses and Notices

I. Background

    On March 10, 1995, NHTSA published a final rule amending Federal 
Motor Vehicle Safety Standard (FMVSS) No. 121, Air brake systems, to 
require medium and heavy vehicles to be equipped with an antilock brake 
system (ABS) (60 FR 13216). Truck tractors will be required to be 
equipped with ABS beginning March 1, 1997, and air-braked trailers and 
single-unit trucks will be required to be so equipped beginning March 
1, 1998. These vehicles also will be required to be equipped with 
indicator lamps to alert their drivers of ABS malfunctions. Each truck 
equipped to tow trailers, including a truck tractor, will be required 
to be equipped with two in-cab warning lamps: one to indicate 
malfunctions of its own ABS, and another to indicate ABS malfunctions 
on units it tows. Trailers will be required to be equipped with an 
electrical circuit capable of signaling a trailer ABS malfunction to 
the cab of the towing unit.
    NHTSA recognized that, during the initial transition period, there 
is a high likelihood that new ABS-equipped trailers will frequently be 
towed by older, non ABS-equipped tractors or trucks that will not have 
the capability to receive ABS malfunction signals transmitted from 
trailers. Accordingly, to provide drivers, and maintenance and 
inspection personnel, with the ability to determine a malfunction with 
the trailer ABS, the agency has required that trailers (including 
converter dollies) also be required to be equipped with a separate 
external ABS malfunction indicator. The March 10, 1995, final rule 
specified an interim eight-year period, from March 1, 1998, to March 1, 
2006, during which these external ABS malfunction indicator lamps must 
be installed on trailers.1 The agency reasoned that, after that 
time period, there would be sufficient new ABS-equipped truck tractors 
and towing trucks fitted with in-cab trailer ABS malfunction warning 
indicators to obviate the need for the separate trailer-mounted ABS 
malfunction warning lamp. The agency intended the trailer-mounted lamps 
to be visible to drivers using their outside rearview mirrors.
---------------------------------------------------------------------------

     1  A final rule responding to petitions for 
reconsideration extended this requirement until March 1, 2009 (61 FR 
5949, February 15, 1996).
---------------------------------------------------------------------------

II. Petitions for Reconsideration and Notice of Proposed Rulemaking

    NHTSA received 16 petitions for reconsideration to the March 10, 
1995 final rule. Most of these petitions addressed testing and 
implementation issues associated with the requirements for ABS. In 
addition, Midland-Grau and the Truck Trailer Manufacturers Association 
(TTMA) requested changes in the requirements for external trailer ABS 
malfunction indicator lamps. Specifically, they petitioned NHTSA to 
delete the requirement that the external malfunction indicator lamp on 
a trailer be visible from the driver's seating position ``through the 
rearview mirrors.'' (see S5.2.3.3). Midland-Grau stated that since 
truck tractor manufacturers cannot control where the external lamp 
would be located, requiring tractor manufacturers to ensure that the 
lamp is visible from the cab of the truck tractor is unreasonable. TTMA 
stated that since trailer manufacturers cannot control where mirrors 
are located on tractors, requiring the ABS malfunction lamp on dollies 
and trailers to be visible ``through the rearview mirrors'' is not 
appropriate. That organization also stated that there is no good, 
practical location for such a lamp on a dolly.
    On December 13, 1995, NHTSA published two notices in response to 
the petitions for reconsideration: (1) A final rule (60 FR 63965) that 
amended portions of the standard dealing with ABS and stopping distance 
requirements, and (2) a notice of proposed rulemaking (NPRM) (60 FR 
64010) that proposed changing the requirements for the location, color, 
and intensity of the external ABS malfunction lamps on trailers and 
dollies.
    On February 15, 1996, NHTSA issued another final rule (61 FR 5949) 
that responded to 13 petitions for reconsideration to the December 13, 
1995 final rule. Specifically, the agency amended the trailer ABS 
electrical powering requirements and adopted a four-year delay in the 
effective date on which truck tractors and trucks equipped to tow 
trailers must be capable of receiving and displaying ABS malfunction 
warning signals from trailers. Because of the delay in the requirement 
for in-cab signaling, the agency extended the transition period during 
which trailers must be equipped with the external ABS malfunction 
indicator. Thus, these lamps must be equipped on trailers manufactured 
on and after March 1, 1998, and before March 1, 2009.

III. Comments on the December NPRM

    NHTSA received comments on the proposal to amend the external 
trailer ABS malfunction indicator requirements from TTMA, Midland-Grau, 
the American Trucking Associations (ATA), the American Society of 
Safety Engineers (ASSE), Truck-Lite, Inc., and Grote Industries, Inc. 
The commenters generally agreed with the need for the external trailer 
ABS malfunction indicator lamp. Most commenters requested that the lamp 
be located at the trailer's rear rather than at its front. The agency's 
responses to specific comments about the lamp's location, labeling, 
color, activation protocol, and photometric requirements are set forth 
below.

IV. Agency Decision

A. General Considerations

    After reviewing the comments and other available information, NHTSA 
has decided to adopt requirements with respect to the location, color, 
activation protocol, and photometric intensity of the external ABS 
malfunction lamps on trailers and trailer converter dollies. The ABS 
malfunction indicator lamp on a trailer will have to be mounted near 
the rear of the left side of the trailer, no closer than 150 mm (5.9 
inches) and not more than 600 mm (23.6 inches) from the rear red side 
marker lamp. The ABS malfunction indicator lamp for a converter dolly 
will have to be mounted on a permanent structure on the dolly at least 
375 mm (14 inches) above the road surface. In all cases, the 
malfunction indicator lamp must be yellow and be illuminated whenever 
power is supplied to the ABS and there

[[Page 49693]]

is a malfunction. The lamps will also meet the requirements for 
combination clearance side marker lamps specified by the Society of 
Automotive Engineer's (SAE's) Recommended Practice J592 July 1972 or 
JUN92 which is referenced in Standard No. 108. The specific details of 
each requirement are discussed below

B. Location

    In the December 1995 NPRM, NHTSA proposed that the trailer ABS 
malfunction indicator lamp be located on the left side of each trailer, 
as close to the front as practicable, and at a height as close as 
practicable to 96 inches above the road surface. The proposed location 
requirement was patterned after a previous agency proposal to require a 
low air pressure warning lamp on trailers. (55 FR 4453, February 8, 
1990) The proposed height was consistent with the mean driver eye 
height, as reported in a University of Michigan study.2 Given 
anticipated practicability problems for some trailers, such as flatbeds 
and lowboys, the agency also proposed that the malfunction indicator 
lamp could be located on the front of the trailer, as far leftward as 
possible and at a height as close to 96 inches as practicable.
---------------------------------------------------------------------------

    \2\ ``The Influence of Truck Driver Eye Position on the 
Effectiveness of Retroreflective Traffic Signs,'' by Sivak, 
Flannagan, and Gellatly, September 1991.
---------------------------------------------------------------------------

    Truck-Lite agreed with the proposal to locate the external ABS 
indicator near the front of the trailer. TTMA, ATA, Midland-Grau, and 
Grote recommended that this indicator be located at the rear of the 
trailer near the red side marker lamp. They stated that such a location 
would allow the indicator to be visible and readily detected when 
activated, provided that the ABS malfunction indicator were yellow. 
These commenters stated that such a location would be readily visible 
to drivers who use the red side marker lamp as a visual location cue to 
help them track the lateral position of their trailer when making 
turns.
    NHTSA has decided to require that the external trailer ABS 
malfunction indicator lamp be located near the rear of the trailer. The 
agency believes that this lamp will be readily seen by drivers using 
their rearview mirrors, and during walkaround vehicle inspections. The 
agency notes that this lamp will only activate in those rare situations 
when the trailer ABS has malfunctioned. The external trailer ABS 
malfunction indicator must be located near the rear of the left side of 
a trailer when viewed from the rear of the trailer, no closer than 150 
mm (5.9 inches) and not more than 600 mm (23.6 inches) from the rear 
red side marker lamp. The agency selected this range to ensure a 
standardized location of this lamp near the trailer rear, thereby 
facilitating its being viewed by drivers, while providing flexibility 
to trailer manufacturers. This requirement combines the suggestions of 
Midland-Grau, TTMA, ATA, and Grote, concerning the specific location 
requirements for the trailer ABS malfunction indicator relative to the 
red rear side marker lamp.
    This decision reflects several considerations. In this standardized 
location, the lamp can be seen by drivers, as well as fleet maintenance 
and roadside inspection personnel, during pre-trip and post-trip 
inspections. Platform trailers, pole/logging trailers, and other 
miscellaneous trailers typically lack a front face. Based on Table 1 
below, these trailers account for approximately 25 percent of all 
trailers. For such trailers, a front mounting position of the external 
malfunction indicator would have been problematic. In contrast, an 
external malfunction indicator can be mounted on the rear left of all 
trailers, even platform and other trailers that may have had difficulty 
complying with the proposal for locating the indicator by the trailer's 
front face. Moreover, locating the lamp in the rear also reduces 
installation costs and improves durability since less wire will be 
needed between the ABS electronic control unit (ECU) and the light it 
activates, compared to locating the indicator at the front of trailers. 
Accordingly, NHTSA believes that requiring the indicator lamp to be 
located on the rear left side will provide manufacturers sufficient 
latitude and flexibility in equipping their trailers with this lamp.

    Table 1.--U.S. Commercial Truck Fleet by Major Body Type * (1992)   
------------------------------------------------------------------------
                                                              Percent of
                      Cargo body type                         1992 fleet
                                                              population
------------------------------------------------------------------------
Platform...................................................         22.2
Van........................................................         44.5
Auto Transport.............................................          1.5
Dump.......................................................         10.1
Grain Bodies...............................................          4.2
Garbage/Refuse.............................................          0.4
Livestock..................................................          1.3
Pole/Logging...............................................          3.2
Tank/Dry Bulk..............................................          2.0
Tank/Liquids or Gas........................................          7.4
Others.....................................................          3.2
                                                            ------------
      Total................................................       100.0 
------------------------------------------------------------------------
* Source: 1992 Truck Inventory and Use Survey, U.S. Census Bureau.      

    Truck-Lite was the only commenter to specifically address NHTSA's 
proposal to require that a malfunction indicator lamp be placed on a 
permanent structure of the dolly and be visible to a person standing on 
the road surface near the location of the indicator. That commenter 
agreed with the agency's proposal. Since the agency continues to 
believe that the proposed location for dollies is appropriate, the 
agency has decided to adopt the location requirement for dollies, as 
proposed.

C. Color

    In the December 1995 NPRM, NHTSA proposed that the external ABS 
malfunction indicator be yellow. The agency reasoned that this color 
was consistent with the requirements in Standard No. 101, Controls and 
displays, which requires that in-vehicle ABS malfunction indicator 
lamps be yellow. The agency further stated that selecting this color 
would harmonize the requirement with the vehicle standards of the 
International Organization for Standardization (ISO) and the Economic 
Commission for Europe (ECE) which specify red to indicate brake failure 
and yellow to indicate ABS malfunction. While NHTSA recognized that 
these color requirements are applicable to instrument panel lamps and 
do not address ABS malfunction indicator lamps on the exterior of a 
vehicle, the agency stated that it is desirable to have a uniform 
protocol. The agency tentatively concluded that the same requirements 
should be applied to external ABS malfunction lamps since they perform 
the same function as in-vehicle ABS malfunction lamps. The agency 
further concluded that a green status lamp on the trailer exterior 
would be inconsistent with the already established convention, thereby 
creating confusion among drivers.
    TTMA, Midland-Grau, and Grote recommended that the external ABS 
malfunction indicator lamp be yellow, provided that it was located at 
the trailer's rear. These commenters believed a yellow color was 
necessary to make it possible for drivers to distinguish this lamp from 
the red rear side marker lamp. They stated that a yellow lamp would be 
visible and readily detected, when activated, because the red rear side 
marker lamp is now routinely seen by drivers using their rearview 
mirrors. ATA stated, without explanation, that a yellow malfunction 
indicator should not be mounted at the trailer's rear. ATA favored a 
green status indicator, stating that the SAE Truck and Bus ABS Task 
Force had recently issued a

[[Page 49694]]

recommended practice that ``status indicators'' on a vehicle's exterior 
should be green and should illuminate when the ABS is operating 
properly.
    After reviewing the available information, NHTSA has decided to 
require the external trailer ABS malfunction indicator lamp to be 
yellow. The agency believes that yellow will minimize confusion, be 
readily understandable by drivers, and be distinguishable from the red 
rear side marker lamps.3 NHTSA believes that while a green light 
is appropriate to indicate that a system is operating properly, it 
would be potentially confusing to indicate that a system such as the 
trailer ABS is malfunctioning. The commonly accepted convention for 
indicating the readiness of a system is an activated green light. NHTSA 
notes that there would be no prohibition against supplementing the 
required yellow external malfunction indicator lamp on a trailer with a 
green lamp on the ECU to indicate the trailer ABS's status. Such a 
supplemental lamp would not have to conform to any of the color or 
protocol requirements specified for the external trailer ABS 
malfunction indicator lamp.
---------------------------------------------------------------------------

    \3\ Table I of Standard 108 includes a requirement for, on the 
side of each trailer, a yellow clearance lamp at the front and a red 
clearance lamp at the rear.
---------------------------------------------------------------------------

    TTMA, ATA, Midland-Grau, and Grote suggested that the trailer ABS 
malfunction indicator lamp be labeled with the letters ``ABS'' to 
distinguish this lamp from other, otherwise identical, yellow side 
marker lamps. They suggested several ways to distinguish the yellow 
side markers from the trailer ABS indicator, including a decal on the 
lens itself; a permanent marking on the lens or its housing; or a 
permanent decal or plaque affixed to the trailer structure, at a 
location immediately adjacent to the lamp.
    NHTSA has decided to require the yellow trailer ABS malfunction 
indicator lamp to be identified with the letters ``ABS'' to distinguish 
this lamp from the yellow side marker/clearance lamps. This 
identification is intended to inform drivers and others making a pre-
trip inspection that this lamp functions as a trailer ABS malfunction 
indicator. The agency has specified several acceptable methods of 
permanently marking the lamp to provide manufacturers with flexibility 
in complying with this requirement. Specifically, a manufacturer may 
use any of the following ways to permanently identify the trailer ABS 
malfunction indicator: marking the lens, marking the lens housing, 
affixing a label or plaque to the trailer near the indicator, or 
painting the trailer near the indicator.
    NHTSA is also specifying minimum character size requirements for 
the indicator lamp identification, which are based on generally 
recognized human factors design principles.4 The agency based its 
selection of the character sizes on its assumption that 15 feet was a 
reasonable estimate of the distance between the driver or mechanic 
during a pre-trip walk-around inspection of a trailer.
---------------------------------------------------------------------------

    \4\ ``Visual Display Character Size,'' Woodson, WE Human Factor 
Design Handbook, McGraw-Hill, New York, 1981, pages 494-495.
---------------------------------------------------------------------------

D. Activation Protocol

    In earlier comments and its petition for reconsideration, TTMA 
requested the lamp to be lit continuously when the ABS is functioning 
properly and to be extinguished when there is a malfunction in the ABS.
    NHTSA addressed this issue in detail in the March 1995 final rule 
on heavy vehicle ABS rulemaking. In that notice, the agency decided to 
require that the ABS malfunction indicator lamp be lit when a 
malfunction exists and not be lit when the antilock system is 
functioning properly. S5.2.3.3 of Standard No. 121 further requires 
that the trailer ABS malfunction indicator lamp be lit during the 
check-of-lamp function only when the vehicle is stationary and power is 
first supplied to the antilock system. This allows the ABS lamp on a 
trailer that is moving to undergo the check of lamp function, without 
the lamp cycling on and off whenever the brakes are applied. The agency 
stated that such a requirement eliminates distractions for the driver 
and for drivers of adjacent vehicles, created by the ABS lamp cycling 
on and off with every brake application. The agency emphasized that in 
the event of a malfunction in the trailer antilock system, the 
malfunction indicator lamp would be lit whenever power is supplied to 
the trailer antilock system, regardless of whether the vehicle is 
stationary or moving. Accordingly, the agency decided to deny TTMA's 
request in its petition for a change in the ABS malfunction indicator 
lamp protocol and proposed no change to the protocol included in the 
ABS final rule.
    No commenter addressed the trailer ABS indicator's activation 
protocol.
    NHTSA continues to believe that the ABS malfunction indicator lamp 
should follow the accepted convention of activating when a malfunction 
exists and not activating when the antilock system is functioning 
properly. Thus, this protocol, first contained in the March 10, 1995 
final rule requirements, remains in effect.

E. Intensity and Photometric Requirements

    In their original petition to the March 10, 1995 final rule, AAMA 
and TTMA petitioned NHTSA to require that the external ABS malfunction 
indicator lamp be subject to the same photometric 5 requirements 
as those specified in Standard No. 108.
---------------------------------------------------------------------------

     5  Photometric values specify the amount of light emitted 
by a lamp, when measured from a specified distance.
---------------------------------------------------------------------------

    NHTSA tentatively agreed with these petitioners in its December 13, 
1995, final rule and proposed that the lamps meet the photometric 
requirements for clearance, side marker, and identification lamps 
specified by SAE Recommended Practice J592 JUN92 for clearance lamps, 
which are referenced in Standard No. 108. Specifically, the agency 
proposed that ABS malfunction indicator lamps meet the photometric 
performance requirements specified in SAE J592 JUN92 for the luminous 
intensity of side marker lamps. Those requirements specify minimum 
intensity values at test points of 45 degrees along a horizontal axis 
and 10 degrees along a vertical axis, when measured from a lamp 
distance of at least three meters. In addition, the agency proposed 
that the lamp be mounted on the trailer in such a manner that its beam 
is directed toward the front of the trailer and rotated 90 degrees so 
that its top and bottom become its sides. The agency believed that such 
an orientation of the lamp would ensure that its widest light beam is 
in a vertical plane just outboard of the side of the trailer, and hence 
would be more likely to be visible by the driver through the tractor's 
rearview mirrors.
    Truck-Lite, TTMA, and Midland-Grau requested that conformance be 
allowed to the July 1972 version of SAE J592 (as well as the June 1992 
version), since that earlier version is referenced in Standard No. 108 
and many currently manufactured and stocked lamps have been certified 
as having met that version of the standard. These commenters also 
stated that the agency's proposal to rotate the lamp 90 degrees was 
inappropriate since the requirement would necessitate designing new 
lamps for an extremely limited market. They suggested that such a 
redesign would add costs for little apparent gain. Alternatively, they 
requested the agency require the use of a combination clearance/side 
marker lamp instead of a

[[Page 49695]]

simple side marker lamp, because the combination lamps, which have 
``PC'' or ``P2'' marked on the lens or housing in accordance with SAE 
J579c, Lighting Identification Code, have a uniform and wide diffused 
beam pattern throughout the full 180 degree left and right range. Thus, 
if this type lamp was used, rotating the lenses, or mounting the lamp 
facing toward the front of the trailer would be unnecessary.
    After reviewing the comments, NHTSA has amended the standard to 
permit conformance to either the July 1972, or June 1992 version of SAE 
J592. Additionally, the standard has been amended to require that a 
combination clearance/side marker lamp with a ``PC'' or ``P2'' marked 
on the lens or housing in accordance with SEA J759 Jan 95, Lighting 
Identification Code, be used as the external trailer ABS warning lamp. 
The agency agrees with the commenters that this change will provide 
additional flexibility, without any detriment to safety. Based on the 
available information concerning the light output pattern of 
combination clearance/side marker lamps, the agency has decided that 
rotating lamps is not necessary to achieve the intended function of 
this lamp.

V. Costs

    NHTSA has already evaluated the economic impact of requiring 
trailers and dollies to be equipped with an external ABS malfunction 
indicator lamp in the final rule on heavy vehicle ABS published on 
March 10, 1995. The agency estimated that the unit cost of requiring an 
ABS lamp on trailers and dollies is $9.43. Since this rule does not 
require additional equipment, but only specifies location, color and 
photometric intensity for the trailer ABS malfunction indicator lamp, 
the rule should not have any impact on previously estimated costs or 
benefits. The agency notes that there will be some nominal additional 
costs associated with the labeling requirements. There will also be 
some cost savings, compared to the December 1995 proposal, since 
manufacturers will not have to redesign those trailers lacking a front 
face on which to install a malfunction indicator lamp. Under the 
proposal, a significant minority of trailers (approximately 25 percent) 
would have needed a permanent structure attached to the trailer to 
comply with the proposed requirement. Locating the lamp in the rear 
also reduces installation costs and improves durability since less wire 
will be needed between the ABS electronic control unit (ECU) and the 
light it activates, compared to locating the indicator at the front of 
trailers.

VI. Rulemaking Analyses and Notices

1. Executive Order 12866 (Federal Regulatory Planning and Review) and 
DOT Regulatory Policies and Procedures

    This rulemaking was not reviewed under E.O. 12866. NHTSA has 
analyzed this proposal and determined that it is not ``significant'' 
within the meaning of the Department of Transportation's regulatory 
policies and procedures. The impacts of the rule are so minimal as not 
to warrant preparation of a full regulation evaluation. As noted above, 
NHTSA has already evaluated the economic impact of requiring an 
external ABS malfunction indicator lamp. For details, see the Final 
Economic Assessment (FEA) titled, ``Final Rules FMVSS Nos. 105 & 121 
Stability and Control While Braking Requirements and Reinstatement of 
Stopping Distance Requirements for Medium and Heavy Vehicles,'' 
published in June 1994.

2. Regulatory Flexibility Act

    In accordance with the Regulatory Flexibility Act, NHTSA has 
evaluated the effects of this action on small entities. Based upon this 
evaluation, I certify that the amendment will not have a significant 
economic impact on a substantial number of small entities. Vehicle and 
brake manufacturers typically do not qualify as small entities. 
Further, aside from the relatively small cost impacts noted above, the 
amendment will not affect costs or benefits beyond those addressed in 
the (FEA) for the ABS final rule. Accordingly, no regulatory 
flexibility analysis has been prepared.

3. Executive Order 12612 (Federalism)

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that the rule does not have sufficient Federalism implications to 
warrant preparation of a Federalism Assessment. No State laws are 
affected.

4. National Environmental Policy Act

    The agency has considered the environmental implications of this 
rule in accordance with the National Environmental Policy Act of 1969 
and determined that the rule does not significantly affect the human 
environment.

5. Civil Justice Reform

    The rule does not have any retroactive effect. Under section 103(d) 
of the National Traffic and Motor Vehicle Safety Act (49 U.S.C. 30111), 
whenever a Federal motor vehicle safety standard is in effect, a state 
may not adopt or maintain a safety standard applicable to the same 
aspect of performance which is not identical to the Federal standard. 
Section 105 of the Act (49 U.S.C. 30161) sets forth a procedure for 
judicial review of final rules establishing, amending or revoking 
Federal motor vehicle safety standards. That section does not require 
submission of a petition for reconsideration or other administrative 
proceedings before parties may file suit in court.

List of Subjects in 49 CFR Part 571

    Imports, Incorporation by reference, Motor vehicle safety, Motor 
vehicles, Rubber.

    In consideration of the foregoing, the agency is amending Standard 
No. 121, Air Brake Systems, in Title 49 of the Code of Federal 
Regulations, Part 571 as follows:

PART 571--FEDERAL MOTOR VEHICLE SAFETY STANDARDS

    1. The authority citation for Part 571 continues to read as 
follows:

    Authority: 49 U.S.C. 322, 30111, 30115, 30117, and 30166; 
delegation of authority at 49 CFR 1.50.

    2. Section 571.121, as revised at 61 FR 27290 effective March 1, 
1997, is amended by revising S5.2.3.3, to read as follows:

Sec. 571.121  Standard No. 121; Air brake systems.

* * * * *
    S5.2.3.3  Antilock malfunction indicator.
    (a) In addition to the requirements of S5.2.3.2, each trailer and 
trailer converter dolly manufactured on or after March 1, 1998, and 
before March 1, 2009, shall be equipped with an external antilock 
malfunction indicator lamp that meets the requirements of S5.2.3.3 (b) 
through (d).
    (b)(1) The lamp shall be designed to conform to the performance 
requirements of Society of Automotive Engineers (SAE) Recommended 
Practice J592 JUN92, or J592e, July 1972, Clearance, Side Marker, and 
Identification Lamps, for combination, clearance, and side marker 
lamps, which are marked with a ``PC'' or ``P2'' on the lens or housing, 
in accordance with SAE J759 Jan 95, Lighting Identification Code. SAE 
J592 June 92, SAE J592e July 1972, and SAE J759 January 1995, are 
incorporated by reference and thereby are made part of this standard. 
The Director of the Federal Register approved the material

[[Page 49696]]

incorporated by reference in accordance with 5 U.S.C. 552(a) and 1 CFR 
part 51. Copies of the material may be inspected at NHTSA's Docket 
Section, 400 Seventh Street, SW., room 5109, Washington, DC, or at the 
Office of the Federal Register, 800 North Capitol Street, NW., 
Washington, DC.
    (2) The color of the lamp shall be yellow.
    (3) The letters ``ABS'' shall be permanently molded, stamped, or 
otherwise marked or labeled in letters not less than 10 mm (0.4 inches) 
high on the lamp lens or its housing to identify the function of the 
lamp. Alternatively, the letters ``ABS'' may be painted on the trailer 
body or dolly or a plaque with the letters ``ABS'' may be affixed to 
the trailer body or converter dolly; the letters ``ABS'' shall be not 
less than 25 mm (1 inch) high. A portion of one of the letters in the 
alternative identification shall be not more than 150 mm (5.9 inches) 
from the edge of the lamp lens.
    ( c) Location requirements. (1) Each trailer that is not a trailer 
converter dolly shall be equipped with a lamp mounted on a permanent 
structure on the left side of the trailer as viewed from the rear, no 
closer than 150 mm (5.9 inches), and no farther than 600 mm (23.6 
inches), from the red rear side marker lamp.
    (2) Each trailer converter dolly shall be equipped with a lamp 
mounted on a permanent structure of the dolly so that the lamp is not 
less than 375 mm (14.8 inches) above the road surface when measured 
from the center of the lamp with the dolly at curb weight. When a 
person, standing 3 meters (9.8 feet) from the lamp, views the lamp from 
a perspective perpendicular to the vehicle's centerline, no portion of 
the lamp shall be obscured by any structure on the dolly.
    (d) The lamp shall be illuminated whenever power is supplied to the 
antilock brake system and there is a malfunction that affects the 
generation or transmission of response or control signals in the 
trailer's antilock brake system. The lamp shall remain illuminated as 
long as such a malfunction exists and power is supplied to the antilock 
brake system. Each message about the existence of such a malfunction 
shall be stored in the antilock brake system whenever power is no 
longer supplied to the system. The lamp shall be automatically 
reactivated when power is again supplied to the trailer's antilock 
brake system. The lamp shall also be activated as a check of lamp 
function whenever power is first supplied to the antilock brake system 
and the vehicle is stationary. The lamp shall be deactivated at the end 
of the check of lamp function, unless there is a malfunction or a 
message about a malfunction that existed when power was last supplied 
to the antilock brake system.
* * * * * *
    Issued on: September 11, 1996.
Ricardo Martinez,
Administrator.
[FR Doc. 96-23796 Filed 9-20-96; 8:45 am]
BILLING CODE 4910-59-P

Complete official Federal Register PDF

FR Doc. 96-23652 Minor Amendments to Inspection/Maintenance Program Requirements
[Federal Register Volume 61, Number 185 (Monday, September 23, 1996)]
[Rules and Regulations]
[Pages 49680-49682]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-23652]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 51
[FRL-5610-4]

Minor Amendments to Inspection/Maintenance Program Requirements
AGENCY: Environmental Protection Agency.

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: This rule changes a provision of the federal vehicle 
inspection and maintenance (I/M) rules relating to motorist compliance 
enforcement mechanisms for pre-existing programs. The current rule 
limits the use of pre-existing enforcement mechanisms, other than 
denial of vehicle registration, to those geographic areas previously 
subject to the I/M program. This rule change allows states to employ 
such effective pre-existing enforcement mechanisms as sticker 
enforcement in any area in the state adopting an I/M program. This 
amendment is consistent with the relevant requirements of the Clean Air 
Act. These changes will not result in any change in health and 
environmental benefits.

DATES: This rule will take effect November 22, 1996 unless EPA receives 
adverse comments on a parallel proposal of this action, published 
elsewhere in this Federal Register, by October 23, 1996. Should EPA 
receive such comments, EPA will publish a subsequent document in the 
Federal Register withdrawing this direct final rule prior to the 
effective date. Anyone wishing to submit comments on the parallel 
proposal should do so at this time.

ADDRESSES: Materials relevant to this rulemaking are contained in the 
Public Docket No. A-91-75. The docket is located at the Air Docket, 
Room M-1500 (6102), Waterside Mall SW, Washington, DC 20460. The docket 
may be inspected between 8:30 a.m. and 12 noon and between 1:30 p.m. 
until 5:30 p.m. on weekdays. A reasonable fee may be charged for 
copying docket material. Electronic copies of the preamble and the 
regulatory text of this rulemaking are available on the Office of Air 
Quality Planning and Standards (OAQPS) Technology Transfer Network 
Bulletin Board System (TTN BBS) and the Office of Mobile Sources' World 
Wide Web cite, http://ww.epa.gov/OMSWWW/.

FOR FURTHER INFORMATION CONTACT: Leila Cook, Office of Mobile Sources, 
National Vehicle and Fuel Emissions Laboratory, 2565 Plymouth Road, Ann 
Arbor, Michigan, 48105. Telephone (313) 741-7820.

SUPPLEMENTARY INFORMATION: 
Regulated Entities
    Entities potentially regulated by the minor amendment to the I/M 
rule are those which adopt, approve, or fund I/M programs. Regulated 
categories and entities include:

------------------------------------------------------------------------
              Category                  Examples of regulated entities  
------------------------------------------------------------------------
Local government....................  Local air quality agencies.       
State government....................  State air quality agencies        
                                       responsible for I/M programs.    
Federal.............................  EPA.                              
government..........................                                    
------------------------------------------------------------------------

    This table is not intended to be exhaustive, but rather provides a 
guide for readers regarding entities likely to be affected by this 
action. This table lists the types of entities that EPA is now aware 
that could potentially be regulated by this I/M amendment. Other types 
of entities not listed in the table could also be regulated. To 
determine whether your organization is regulated by this action, you 
should carefully examine the applicability criteria of 40 CFR 51.361 of 
the I/M rule. If you have any questions regarding the applicability of 
this action to a particular entity, consult the person listed in the 
preceding FOR FURTHER INFORMATION CONTACT section.
    Under the Clean Air Act as amended in 1990 (the Act), 42 U.S.C. 
7401 et seq., the U.S. Environmental Protection Agency (EPA) published 
in the Federal Register on November 5, 1992 (40 CFR part 51, subpart S) 
rules relating to motor vehicle inspection and maintenance (I/M) 
programs (hereafter referred to as the I/M rule; see 57 FR 52950). EPA 
here amends those rules to broaden the geographic area in which pre-
existing enforcement mechanisms can be employed.
    Section 182(c)(3) of the Act establishes the statutory requirements 
for enhanced I/M programs. Subsection (c)(3)(C)(iv) requires the use of 
vehicle registration denial enforcement mechanisms except in certain 
cases. The statute allows the use of alternative enforcement mechanisms 
that are demonstrated to be more effective than vehicle registration 
denial for any program in operation before enactment of the 1990 
amendments of the Act.
    In the 1992 I/M rules, EPA interpreted this statutory requirement 
to allow the use of pre-existing alternative enforcement mechanisms 
only in the same geographic area where the prior program had been 
implemented using that alternative 40 CFR 51.361. That regulation did 
not provide for the use of alternative enforcement mechanisms in

[[Page 49681]]

any areas within a state that had not previously had an I/M program, 
even where an effective alternative enforcement mechanism was in place 
elsewhere in the state. In addition, the 1992 I/M rule required pre-
existing alternative enforcement mechanisms to have been approved into 
the SIP.
    Based on experience implementing the I/M rule, EPA now believes 
that the provisions limiting the geographic scope of pre-existing 
enforcement mechanisms should be altered. EPA is amending 40 CFR 51.361 
to allow, anywhere within a state, the use of more effective pre-
existing enforcement mechanisms that the state had previously used in 
only some portion of the state. In states where a pre-existing 
enforcement mechanism can be demonstrated to be more effective than 
registration denial, it would be incongruous to allow the use of that 
mechanism only in those areas that had previously employed the 
mechanism, but require areas within the state newly implementing I/M to 
use a registration denial system that had already been demonstrated to 
be less effective within the state.
    EPA believes that the amendment to section 51.361 is consistent 
with the Act. The statute does not impose a geographic limitation on 
the scope of applicability of pre-existing enforcement mechanisms. The 
statute merely requires that the I/M program have been in place prior 
to the 1990 amendments to the Act, and that the enforcement mechanism 
be demonstrated to be more effective than registration denial. EPA 
believes that where this demonstration can be made, expansion of the 
program, including the pre-existing enforcement mechanism, to other 
areas within the state is appropriate and consistent with the statute.
    Further, EPA is removing the requirement in Sec. 51.361 that pre-
existing enforcement mechanisms have been approved into the SIP. The 
statute requires only that such mechanism have been in operation prior 
to the 1990 amendments to the Act, and says nothing about SIP approval. 
Where a state can demonstrate that its pre-existing enforcement 
mechanism is more effective than registration denial, EPA believes it 
would be inconsistent with the statute to require use of the less 
effective registration denial system merely because the program 
previously in operation had not been approved into the SIP.

Administrative Requirements

Regulatory Flexibility Act

    Pursuant to section 605(b) of the Regulatory Flexibility Act, 5 
U.S.C. 605(b), I certify that this action will not have a significant 
economic impact on a substantial number of small entities and, 
therefore, is not subject to the requirement of a Regulatory Impact 
Analysis. A small entity may include a small government entity or 
jurisdiction. A small government jurisdiction is defined as governments 
of cities, counties, towns, townships, villages, school districts, or 
special districts, with a population of less than 50,000. This 
certification is based on the fact that the I/M areas impacted by this 
rulemaking do not meet the definition of a small government 
jurisdiction, that is, governments of cities, counties, towns, 
townships, villages, school districts, or special districts, with a 
population of less than 50,000. This rule affects only the enforcement 
mechanism states may include in their I/M programs. Furthermore, the 
impact created by this action does not increase the pre-existing burden 
which this proposal seeks to amend.

Unfunded Mandates Act

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule where the estimated costs to State, local, or tribal 
governments, or to the private sector, will be $100 million or more. 
Under Section 205, EPA must select the most cost-effective and least 
burdensome alternative that achieves the objective of the rule and is 
consistent with statutory requirements. Section 203 requires EPA to 
establish a plan for informing and advising any small governments that 
may be significantly impacted by the rule.
    To the extent that the requirements in this action would impose any 
mandate at all as defined in Section 101 of the Unfunded Mandates Act 
upon the state, local, or tribal governments, or the private sector, as 
explained above, this rule is not estimated to impose costs in excess 
of $100 million. Therefore, EPA has not prepared a statement with 
respect to budgetary impacts. As noted above, this rule offers 
opportunities to states that would enable them to lower economic 
burdens from those resulting from the currently existing I/M rule.

Submission to Congress and the General Accounting Office

    Under 5 U.S.C. 801(a)(1)(A) as added by the Small Business 
Regulatory Enforcement Fairness Act of 1996, EPA submitted a report 
containing this rule and other required information to the U.S. Senate, 
the U.S. House of Representatives and the Comptroller General of the 
General Accounting Office prior to publication of the rule in today's 
Federal Register. The rule is not a ``major rule'' as defined by 5 
U.S.C. 804(2).

Executive Order 12866

    It has been determined that this amendment to the I/M rule is not a 
significant regulatory action under the terms of Executive Order 12866 
and has been waived from Office of Management and Budget (OMB) review.

Reporting and Recordkeeping Requirements

    There are no information requirements in this final rule which 
requires the approval of the Office of Management and Budget under the 
Paperwork Reduction Act 44 U.S.C. 3501 et seq.

Effective Date

    This rule will take effect on November 22, 1996, unless EPA 
receives adverse comment on a parallel document proposing these same 
changes published elsewhere in this Federal Register. EPA is using the 
direct final rulemaking procedure in this case because EPA believes 
that these amendments are noncontroversial and does not anticipate 
receiving any adverse comment. Should EPA receive any such comments, 
EPA will publish a subsequent document in the Federal Register 
withdrawing this direct final rule prior to the effective date. EPA 
will then publish another final rule responding to the comments 
received and taking final action on the parallel proposal. Anyone 
wishing to comment on the parallel proposal should do so at this time.

List of Subjects in 40 CFR Part 51

    Environmental protection, Administrative practice and procedure, 
Air pollution control, Carbon monoxide, Intergovernmental relations, 
Lead, Motor vehicle pollution, Nitrogen oxide, Ozone, Particulate 
matter, Reporting and recordkeeping requirements, Sulfur oxides, 
Volatile organic compounds.

[[Page 49682]]

    Dated: September 10, 1996.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, part 51 of Title 40 of the 
Code of Federal Regulations is amended as follows:

PART 51--[AMENDED]

    1. The authority citation for Part 51 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

    2. Section 51.361 is amended by revising the introductory text and 
paragraph (b)(1)(i) to read as follows:

Sec. 51.361   Motorist compliance enforcement.

    Compliance shall be ensured through the denial of motor vehicle 
registration in enhanced I/M programs unless an exception for use of an 
existing alternative is approved. An enhanced I/M area may use an 
existing alternative if it demonstrates that the alternative has been 
more effective than registration denial. An enforcement mechanism may 
be considered an ``existing alternative'' only in states that, for some 
area in the state, had an I/M program with that mechanism in operation 
prior to passage of the 1990 Amendments to the Act. A basic I/M area 
may use an alternative enforcement mechanism if it demonstrates that 
the alternative will be as effective as registration denial. Two other 
types of enforcement programs may qualify for enhanced I/M programs if 
demonstrated to have been more effective than enforcement of the 
registration requirement in the past: Sticker-based enforcement 
programs and computer-matching programs. States that did not adopt an 
I/M program for any area of the state before November 15, 1990, may not 
use an enforcement alternative in connection with an enhanced I/M 
program required to be adopted after that date.
* * * * *
    (b) * * *
    (1) * * *
    (i) For enhanced I/M programs, the area in question shall have had 
an operating I/M program using the alternative mechanism prior to 
enactment of the Clean Air Act Amendments of 1990. While modifications 
to improve compliance may be made to the program that was in effect at 
the time of enactment, the expected change in effectiveness cannot be 
considered in determining acceptability;
* * * * *
[FR Doc. 96-23652 Filed 9-20-96; 8:45 am]
BILLING CODE 6560-50-M

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.