Federal Register final rules — 1996-09-26

issue-1996-09-26Federal Register final rules — 1996-09-26Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-24743 Safety Zone Regulations; Back River and Foster Creek; Charleston, SC
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50436-50437]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24743]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 165

[COTP Charleston 96-052]
RIN 2115-AA97

Safety Zone Regulations; Back River and Foster Creek; Charleston, 
SC

AGENCY: Coast Guard, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a temporary safety zone for 
the U.S. Border Patrol Training Academy Small Arms Range at the 
Charleston Naval Weapons Station. The safety zone will become effective 
at 6 a.m. Eastern Daylight Time (EDT) on September 1, 1996 and will 
terminate at 12 a.m. Eastern Standard Time (EST) on December 1, 1996. 
This safety zone is needed to protect vessels and personnel from safety 
hazards associated with small arms fire.

EFFECTIVE DATES: The regulation is effective at 6 a.m. EDT on September 
1, 1996 and will terminate at 12 a.m. EST on December 1, 1996.

FOR FURTHER INFORMATION CONTACT:
Lieutenant Jeffrey T. Carter, Coast Guard Marine Safety Office 
Charleston, at (803) 720-7701, between the hours of 7:30 a.m. and 4 
p.m. EDT, Monday through Friday, except federal holidays.

SUPPLEMENTARY INFORMATION: In accordance with 5 U.S.C. 533, a notice of 
proposed rulemaking was not published for this regulation and good 
cause exists for making it effective in less than 30 days from the date 
of publication. Following normal rulemaking procedures would have been 
impractical. The information to commence firing at the small arms range 
was not received with sufficient time to publish proposed rules prior 
to the event or to provide for a delayed effective date.

Discussion of Regulations

    The temporary safety zone is being established for the U.S. Border 
Patrol

[[Page 50437]]

Training Academy Small Arms Range at the Charleston Naval Weapons 
Station. This safety zone will become effective at 6 a.m. EDT on 
September 1, 1996 and will terminate at 12 a.m. EST on December 1, 
1996. The safety zone is needed to protect persons, vehicles and 
vessels from safety hazards associated with small arms fire.
    The safety zone will consist of those portions of unnamed 
tributaries of the Back River and Foster Creek that are generally 
described as lying south of the main shoreline and extending southward 
to the northern shoreline of Big Island (U.S. Naval Reservation). 
Specifically, the area beginning at a point on the main shoreline, 
which is the northern shore of an unnamed tributary of Back River at 
position 32 deg.59'19''N, 79 deg.56'52''W, southwesterly to a point on 
or near the northern shoreline of Big Island at position 
32 deg.59'11''N, 79 deg.56'59''W; thence northwesterly to a point on 
the main shoreline, which is the northern shore of an unnamed tributary 
of Foster Creek, at position 32 deg.59'16''N, 79 deg.57'11''W; thence 
easterly along the main shoreline, which is the northern shore of the 
unnamed tributaries of Foster Creek and Back River, back to the point 
of beginning at position 32 deg.59'19''N, 79 deg.56'52''W. All 
coordinates referenced use datum: NAD 1983. The Captain of the Port has 
restricted vessel operations in this safety zone. No persons, vehicles 
or vessels will be allowed to enter or operate within this zone, except 
as may be authorized by the Captain of the Port, Charleston, South 
Carolina. This regulation is issued pursuant to 33 U.S.C. 1231, as set 
out in the authority citation of Part 165.

Regulatory Evaluation

    The regulation is not a significant regulatory action under section 
3(f) of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040, 
February 26, 1979). The Coast Guard expects the economic impact of this 
rule to be so minimal that a full Regulatory Evaluation under paragraph 
10e of the regulatory policies and procedures of DOT is unnecessary. 
Maritime traffic will not be significantly impacted because of the 
small number of vessels expected to need the safety zone, and the 
limited area affected by the zone.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider the economic impact on small entities of a 
rule for which a general notice of proposed rulemaking is required. 
``Small entities'' may include (1) Small businesses and not-for-profit 
organizations that are independency owned and operated and are not 
dominant in their fields and (2) governmental jurisdictions with 
populations of less than 50,000. Small entities will not be affected 
significantly because of the limited duration of the zone and the 
limited area affected by the zone. Therefore, the Coast Guard certifies 
under 5 U.S.C. 605(b) that this rule will not have a significant 
economic impact on a substantial number of small entities.

Collection of Information

    This rule contains no collection-of-information requirements under 
the Paperwork Reduction Act (44 U.S.C. 3501 et eq.).

Federalism

    The Coast Guard has analyzed this rule under the principles and 
criteria contained in Executive Order 12612 and has determined that 
this rule does not have sufficient Federalism implications to warrant 
the preparation of a Federalism Assessment.

Environmental Assessment

    The Coast Guard has considered the environmental impact of this 
rule and concluded that, under paragraph 2.B.2. of Commandant 
Instruction M16475.1B, (as revised by 59 FR 38654, July 29, 1994), this 
rule is categorically excluded from further environmental 
documentation. Pursuant to COMDTINST M16475.1B, paragraph 2.B.2. 
section 34(g), an environmental determination has been made that this 
rule will not significantly affect the environment. A ``Categorical 
Exclusion Determination'' and ``Categorical Exclusion Checklist'' are 
available in the docket for inspection or copying.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Safety measures, Waterways.

Regulations

    In consideration of the foregoing, the Coast Guard amends Subpart C 
of Part 165 of Title 33, Code of Federal Regulations, as follows:

PART 165--[AMENDED]

    1. The authority citation for part 165 continues to read as 
follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1(g), 
6.04-1, 6.04-6, and 160.5; 49 CFR 1.46.

    2. A new temporary section 165.T07-052 is added to read as follows:

Sec. 165.T07-052  Safety Zone; Back River and Foster Creek, Charleston, 
SC.

    (a) Regulated area. Naval Weapons Station/U.S. Border Patrol 
Training Academy Small Arms Range. The following area is a safety zone: 
those portions of unnamed tributaries of the Back River and Foster 
Creek lying south of the main shoreline and extending southward to the 
northern shoreline of Big Island (U.S. Naval Reservation) beginning at 
a point on the main shoreline at 32 deg.59'19''N, 79 deg.56'52''W, then 
to 32 deg.59'11''N, 79 deg.56'59''W; then to 32 deg.56'16''N, 
79 deg.57'11''W; then back to the point of beginning. All coordinates 
referenced use datum: NAD 1983.
    (b) Effective dates. This regulation is effective at 6 a.m. (EDT) 
on September 1, 1996 and will terminate at 12 a.m. (EST) on December 1, 
1996.
    (c) Regulations. In accordance with the general regulations in 
Sec. 165.23 of this part, entry into the zone is subject to the 
following requirements:
    (1) This safety zone is closed to all persons, vehicles and 
vessels, except as any be permitted by the Captain of the Port, 
Charleston, SC.
    (2) Persons desiring to enter or operate vehicles or vessels within 
the safety zone shall contact the Captain of the Port to obtain 
permission to do so. Persons given permission to enter or operate in 
the safety zone shall comply with all directions given them by the 
Captain of the Port.
    (3) The Captain of the Port may be contacted via the Coast Guard 
Group Charleston operations center at (803) 724-7619 or VHF-FM channel 
16.

    Dated: August 30, 1996.
M.J. Pontiff,
Commander, U.S. Coast Guard, Captain of the Port, Charleston, South 
Carolina.
[FR Doc. 96-24743 Filed 9-25-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-24742 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50428-50430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24742]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28693; Amdt. No. 1754]
RIN 2120-AA65

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of 
changes occurring in the National Airspace System, such as the 
commissioning of new navigational facilities, addition of new 
obstacles, or changes in air traffic requirements. These changes are 
designed to provide safe and efficient use of the navigable airspace 
and to promote safe flight operations under instrument flight rules at 
the affected airports.

[[Page 50429]]

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference-approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matter incorporated by reference in the 
amendment is as follows:
    For Examination--
    1. FAA Rules Docket, FAA Headquarters Building, 800 Independence 
Avenue, SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which affected airport 
is located; or
    3. The Flight Inspection Area Office which originated the SIAP.
    For Purchase--Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or
    2. The FAA Regional Office of the region in which the affected 
airport is located.
    By Subscription--Copies of all SIAPs, mailed once every 2 weeks, 
are for sale by the Superintendent of Documents, U.S. Government 
Printing Office, Washington, DC 20402.

FOR FURTHER INFORMATION CONTACT:
Paul J. Best, Flight Procedures Standards Branch (AFS-420), Technical 
Programs Division, Flight Standards Service, Federal Aviation 
Administration, 800 Independence Avenue, SW., Washington, DC 20591; 
telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description on each SIAP is contained in the appropriate FAA 
Form 8260 and the National Flight Data Center (FDC)/Permanent (P) 
Notices to Airmen (NOTAM) which are incorporated by reference in the 
amendment under 5 U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the 
Federal Aviations Regulations (FAR). Materials incorporated by 
reference are available for examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction of charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.

The Rule

    This amendment to part 97 of the Federal Aviation Regulations (14 
CFR part 97) establishes, amends, suspends, or revokes SIAPs. For 
safety and timeliness of change considerations, this amendment 
incorporates only specific changes contained in the content of the 
following FDC/P NOTAM for each SIAP. The SIAP information in some 
previously designated FDC/Temporary (FDC/T) NOTAMs is of such duration 
as to be permanent. With conversion to FDC/P NOTAMs, the respective 
FDC/T NOTAMs have been cancelled.
    The FDC/P NOTAMs for the SIAPs contained in this amendment are 
based on the criteria contained in the U.S. Standard for Terminal 
Instrument Approach Procedures (TERPS). In developing these chart 
changes to SIAPs by FDC/P NOTAMs, the TERPS criteria were applied to 
only these specific conditions existing at the affected airports. All 
SIAP amendments in this rule have been previously issued by the FAA in 
a National Flight Data Center (FDC) Notice to Airmen (NOTAM) as an 
emergency action of immediate flight safety relating directly to 
published aeronautical charts. The circumstances which created the need 
for all these SIAP amendments requires making them effective in less 
than 30 days.
    Further, the SIAPs contained in this amendment are based on the 
criteria contained in the TERPS. Because of the close and immediate 
relationship between these SIAPs and safety in air commerce, I find 
that notice and public procedure before adopting these SIAPs are 
impracticable and contrary to the public interest and, where 
applicable, that good cause exists for making these SIAPs effective in 
less than 30 days.

Conclusion

    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air Traffic Control, Airports, Navigation (Air).

    Issued in Washington, DC on September 20, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

    Authority: 49 U.S.C. 40103, 40113, 40120, 44701; 49 U.S.C. 
106(g); and 14 CFR 11.49(b)(2).

    2. Part 97 is amended to read as follows:

Secs. 97.23, 97.25, 97.27, 97.29, 97.31, 97.33, 97.35  [Amended]

    By amending: Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME or 
TACAN; Sec. 97.25 LOC, LOC/DME, LDA, LDA/DME, SDF, SDF/DME; Sec. 97.27 
NDB, NDB/DME; Sec. 97.29 ILS, ILS/DME, ISMLS, MLS, MLS/DME, MLS/RNAV; 
Sec. 97.31 RADAR SIAPs; Sec. 97.33 RNAV SIAPs; and Sec. 97.35 COPTER 
SIAPs, identified as follows:
    * * *  Effective Upon Publication.

----------------------------------------------------------------------------------------------------------------
  FDC date      State          City           Airport        FDC No.                      SIAP                  
----------------------------------------------------------------------------------------------------------------
09/06/96...  TX          Houston........  Ellington Field       6/6948  ILS RWY 22, AMDT 1...                   
09/10/96...  MO          Camdenton......  Camdenton             6/7036  GPS RWY 33, ORIG...                     
                                           Memorial.                                                            

[[Page 50430]]

                                                                                                                
09/10/96...  MO          Kaiser/Lake      Lee C. Fine           6/7037  GPS RWY 21, ORIG...                     
                          Ozark.           Memorial.                                                            
09/10/96...  MO          Osage Beach....  Grand Glaize-         6/7034  VOR OR GPS RWY 32, AMDT 4...            
                                           Osage Beach.                                                         
09/11/96...  IN          Bloomington....  Monroe County..       6/7064  VOR/DME RWY 35 AMDT 14...               
09/11/96...  IN          Bloomington....  Monroe County..       6/7068  VOR OR GPS RWY 17 AMDT 11...            
09/11/96...  IN          Bloomington....  Monroe County..       6/7070  NDB OR GPS RWY 35 AMDT 4...             
09/11/96...  IN          Bloomington....  Monroe County..       6/7071  ILS RWY 35 AMDT 4...                    
09/11/96...  IN          Bloomington....  Monroe County..       6/7072  VOR OR GPS RWY 24 AMDT 10...            
09/11/96...  MO          Jefferson City.  Jefferson City        6/7056  ILS RWY 30, AMDT 3...                   
                                           Memorial.                                                            
09/11/96...  MO          Jefferson City.  Jefferson City        6/7061  NDB OR GPS RWY 30, AMDT 8...            
                                           Memorial.                                                            
09/11/96...  MS          Greenville.....  Mid Delta             6/7059  LOC BC RWY 36R, AMDT 8...               
                                           Regional.                                                            
09/12/96...  IN          Bloomington....  Monroe County..       6/7123  VOR OR GPS RWY 6 AMDT 16...             
09/12/96...  NC          Louisburg......  Louisburg/            6/7142  VOR/DME OR GPS-A, ORIG-A...             
                                           Franklin                                                             
                                           County.                                                              
09/13/96...  FL          Key West.......  Key West Intl..       6/7170  NDB OR GPS-A AMDT 14...                 
09/13/96...  WI          Appleton.......  Outagamie             6/7038  NDB OR GPS RWY 3 AMDT 14...             
                                           County.                                                              
09/13/96...  WI          Appleton.......  Outagamie             6/7039  VOR/DME RWY 3 AMDT 8...                 
                                           County.                                                              
09/13/96...  WI          Appleton.......  Outagamie             6/7122  ILS RWY 3 AMDT 16...                    
                                           County.                                                              
09/17/96...  CA          Fresno.........  Fresno Air            6/7243  NDB OR GPS RWY 29R AMDT 23...           
                                           Terminal.                                                            
09/17/96...  CA          Fresno.........  Fresno Air            6/7245  ILS RWY 29R AMDT 33...                  
                                           Terminal.                                                            
09/18/96...  AZ          Phoenix........  Phoenix Sky           6/7269  ILS RWY 8R AMDT 9...                    
                                           Harbor Intl.                                                         
09/18/96...  AZ          Prescott.......  Ernest A. Love        6/7282  VOR OR GPS RWY 11 AMDT 1...             
                                           Field.                                                               
----------------------------------------------------------------------------------------------------------------

[FR Doc. 96-24742 Filed 9-25-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-24741 Standard Instrument Approach Procedures; Miscellaneous Amendments
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50427-50428]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24741]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 97

[Docket No. 28692; Amdt. No. 1753]
RIN 2120-AA65

Standard Instrument Approach Procedures; Miscellaneous Amendments

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment establishes, amends, suspends, or revokes 
Standard Instrument Approach Procedures (SIAPs) for operations at 
certain airports. These regulatory actions are needed because of the 
adoption of new or revised criteria, or because of changes occurring in 
the National Airspace System, such as the commissioning of new 
navigational facilities, addition of new obstacles, or changes in air 
traffic requirements. These changes are designed to provide safe and 
efficient use of the navigable airspace and to promote safe flight 
operations under instrument flight rules at the affected airports.

DATES: An effective date for each SIAP is specified in the amendatory 
provisions.
    Incorporation by reference--approved by the Director of the Federal 
Register on December 31, 1980, and reapproved as of January 1, 1982.

ADDRESSES: Availability of matters incorporated by reference in the 
amendment is as follows:
    For Examination--
    1. FAA Rules Docket, FAA Headquarters Building, 800 Independence 
Avenue, SW., Washington, DC 20591;
    2. The FAA Regional Office of the region in which the affected 
airport is located; or
    3. The Flight Inspection Area Office which originated the SIAP.
    For Purchase--Individual SIAP copies may be obtained from:
    1. FAA Public Inquiry Center (APA-200), FAA Headquarters Building, 
800 Independence Avenue, SW., Washington, DC 20591; or
    2. The FAA Regional Office of the region in which the affected 
airport is located.
    By Subscription--Copies of all SIAPs, mailed once every 2 weeks, 
are for sale by the Superintendent of Documents, U.S. Government 
Printing Office, Washington, DC 20402.

FOR FURTHER INFORMATION CONTACT:
Paul J. Best, Flight Procedures Standards Branch (AFS-420), Technical 
Programs Division, Flight Standards Service, Federal Aviation 
Administration, 800 Independence Avenue, SW., Washington, DC 20591; 
telephone (202) 267-8277.

SUPPLEMENTARY INFORMATION: This amendment to part 97 of the Federal 
Aviation Regulations (14 CFR part 97) establishes, amends, suspends, or 
revokes Standard Instrument Approach Procedures (SIAPs). The complete 
regulatory description of each SIAP is contained in official FAA form 
documents which are incorporated by reference in this amendment under 5 
U.S.C. 552(a), 1 CFR part 51, and Sec. 97.20 of the Federal Aviation 
Regulations (FAR). The applicable FAA forms are identified as FAA Forms 
8260-3, 8260-4, and 8260-5. Materials incorporated by reference are 
available for examination or purchase as stated above.
    The large number of SIAPs, their complex nature, and the need for a 
special format make their verbatim publication in the Federal Register 
expensive and impractical. Further, airmen do not use the regulatory 
text of the SIAPs, but refer to their graphic depiction on charts 
printed by publishers of aeronautical materials. Thus, the advantages 
of incorporation by reference are realized and publication of the 
complete description of each SIAP contained in FAA form documents is 
unnecessary. The provisions of this amendment state the affected CFR 
(and FAR) sections, with the types and effective dates of the SIAPs. 
This amendment also identifies the airport, its location, the procedure 
identification and the amendment number.

The Rule

    This amendment to part 97 is effective upon publication of each 
separate SIAP as contained in the transmittal. Some SIAP amendments may 
have been previously issued by the FAA in a National Flight Data Center 
(FDC) Notice to Airmen (NOTAM) as an emergency action of immediate 
flight safety relating directly to published aeronautical charts. The 
circumstances which created the need for some SIAP amendments may 
require making them effective in less than 30 days. For the remaining 
SIAPs, an effective date at least 30 days after publication is 
provided.
    Further, the SIAPs contained in this amendment are based on the 
criteria contained in the U.S. Standard for Terminal Instrument 
Approach Procedures (TERPS). In developing these SIAPs, the TERPS 
criteria were applied to the conditions existing or anticipated at the 
affected airports. Because of the close and immediate relationship 
between these SIAPs and safety in air commerce, I find that notice and 
public procedure before adopting these SIAPs are impracticable and 
contrary to the public interest and, where applicable, that good cause 
exists for making some SIAPs effective in less than 30 days.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore--(1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT

[[Page 50428]]

Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. For the same reason, the FAA 
certifies that this amendment will not have a significant economic 
impact on a substantial number of small entities under the criteria of 
the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 97

    Air traffic control, Airports, Navigation (air).

    Issued in Washington, DC on September 20, 1996.
Thomas C. Accardi,
Director, Flight Standards Service.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me, part 97 of 
the Federal Aviation Regulations (14 CFR part 97) is amended by 
establishing, amending, suspending, or revoking Standard Instrument 
Approach Procedures, effective at 0901 UTC on the dates specified, as 
follows:

PART 97--STANDARD INSTRUMENT APPROACH PROCEDURES

    1. The authority citation for part 97 is revised to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120, 44701; and 14 
CFR 11.49(b)(2).

    2. Part 97 is amended to read as follows:

Secs. 97.23, 97.25, 97.27, 97.29, 97.31, 97.33, 97.35  [Amended]

    By amending: Sec. 97.23 VOR, VOR/DME, VOR or TACAN, and VOR/DME or 
TACAN; Sec. 97.25 LOC, LOC/DME, LDA, LDA/DME, SDF, SDF/DME; Sec. 97.27 
NDB, NDB/DME; Sec. 97.29 ILS, ILS/DME, ISMLS, MLS, MLS/DME, MLS/RNAV; 
Sec. 97.31 RADAR SIAPs; Sec. 97.33 RNAV SIAPs; AND Sec. 97.35 COPTER 
SIAPs, identified as follows:

* * * Effective October 10, 1996

Worcester, MA, Worcester Muni, NDB RWY 29, Orig
Worcester, MA, Worcester Muni, NDB OR GPS RWY 29, Amdt 12 CANCELLED
Worcester, MA, Worcester Muni, ILS RWY 29, Amdt 2
Minneapolis, MN, Minneapolis-St Paul Intl/Wold Chamberlain, NDB or 
GPS RWY 4, Amdt 19
Minneapolis, MN, Minneapolis-St Paul Intl/Wold Chamberlain, ILS RWY 
4, Amdt 25
Amarillo, TX, Amarillo Intl, LDA/DME RWY 22, Orig

* * * Effective November 7, 1996

Cornelia, GA, Habersham County, VOR/DME OR GPS RWY 6, Amdt 5
Chicago, IL, Chicago O'Hare Intl, NDB RWY 32L, Amdt 22, CANCELLED
Parsons, KS, Tri-City, VOR-A, Orig
Parsons, KS, Tri-City, VOR OR GPS RWY 13, Amdt 4, CANCELLED
Bar Harbor, ME, Hancock County-Bar Harbor, LOC/DME BC RWY 4, Amdt 1
Kennett, MO, Kennett Memorial, NDB OR GPS RWY 18, Amdt 3
New York, NY, John F. Kennedy Intl, ILS/DME RWY 22R, Orig-A, 
CANCELLED
New York, NY, John F. Kennedy Intl, ILS RWY 22R, Orig
Rugby, ND, Rugby Muni, NDB RWY 30, Amdt 5
Rugby, ND, Rugby Muni, NDB or GPS RWY 12, Amdt 4
Oxford, OH, Miami University, NDB or GPS RWY 5, Amdt 10
Wapakoneta, OH, Neil Armstrong, LOC RWY 26, Amdt 3
Austin, TX, Austin-Bergstrom Intl, ILS RWY 17R, Orig
Austin, TX, Austin-Bergstrom Intl, ILS RWY 35L, Orig
Austin, TX, Austin-Bergstrom Intl, GPS RWY 17R, Orig
Austin, TX, Austin-Bergstrom Intl, GPS RWY 35L, Orig
Shell Lake, WI, Shell Lake Muni, VOR/DME RWY 32, Orig, CANCELLED
Shell Lake, WI, Shell Lake Muni, VOR/DME RWY 32, Orig

* * * Effective December 5, 1996

St Paul Island, AK, St Paul Island, ILS/DME RWY 36, Amdt 1
Hanford, CA, Hanford Muni, GPS RWY 32, Orig
Hayward, CA, Hayward Air Terminal, GPS Rwy 28L, Orig
Washington, DC, Washington Dulles Intl, NBD RWY 1R, Amdt 17
Washington, DC, Washington Dulles Intl, ILS RWY 1r, Amdt 22
Covington, GA, Covington Muni, VOR/DME OR GPS RWY 10, Amdt 3
Covington, GA, Covington Muni, NDB RWY 28, Amdt 1
Covington, GA, Covington Muni, GPS RWY 28, Orig
Moultrie, GA, Moultrie Muni, NDB-A, Orig
Iowa City, IA, Iowa City Muni, RNAV RWY 24, Amdt 1A CANCELLED
New Orleans, LA, Lakefront, VOR OR GPS-A, Amdt 16 CANCELLED
New Orleans, LA, Lakefront, VOR OR GPS-B, Amdt 8 CANCELLED
New Orleans, LA, Lakefront, VOR RWY 18R, Amdt 4
New Orleans, LA, Lakefront, VOR/DME OR GPS RWY 36L, Amdt 7
New Orleans, LA, Lakefront, ILS RWY 18R, Amdt 12
Reserve, LA, St John The Baptist Parish, GPS RWY 17, Orig
Gaylord, MI, Otsego County, VOR or GPS RWY 9, Orig
Kansas City, MO, Richards-Gebaur Memorial, ILS RWY 1, Amdt 4
Kansas City, MO, Richards-Gebaur Memorial, GPS RWY 1, Orig
Kansas City, MO, Richards-Gebaur Memorial, GPS RWY 19, Orig
Sikeston, MO, Sikeston Meml Muni, GPS RWY 20, Orig
Broken Bow, NE, Broken Bow Muni, GPS RWY 14, Orig
Columbus, NE, Columbus Muni, GPS RWY 14, Orig
Newburgh, NY, Stewart Intl, VOR RWY 27, Amdt 4
Mount Airy, NC, Mount Airy/Surry County, GPS RWY 36, Orig
Altus, OK, Altus Muni, GPS RWY 17, Orig
Altus, OK, Altus Muni, VOR/DME RNAV RWY 17, Amdt 1
Antlers, OK, Antlers Muni, GPS RWY 35, Orig
Boise City, OK, Boise City, GPS RWY 4, Orig
Durant, OK, Eaker Field, GPS RWY 35, Orig
Perry, OK, Perry Muni, GPS RWY 17, Orig
Sallisaw, OK, Sallisaw Muni, NDB OR GPS-A, Amdt 1
Sallisaw, OK, Sallisaw Muni, GPS RWY 35, Orig
Tulsa, OK, Richard Lloyd Jones Jr, GPS RWY 1L, Orig
Weatherford, OK, Thomas P Stafford, NDB RWY 17, Amdt 3
Weatherford, OK, Thomas P Stafford, GPS RWY 17, Orig
Weatherford, OK, Thomas P Stafford, GPS RWY 35, Amdt 1
Harrisburg, PA, Capital City, GPS RWY 26, Orig
Philadelphia, PA, Wings Field, GPS RWY 24, Orig
Big Lake, TX, Reagan County, NDG OR GPS RWY 16, Amdt 1, CANCELLED
Big Lake, TX, Reagan County, GPS RWY 16, Orig
Blacksburg, VA, Virginia Tech, LOC RWY 12, Amdt 4
Blacksburg, VA, Virginia Tech, GPS RWY 12, Orig
Winchester, VA, Winchester Regional, LOC RWY 32, Amdt 4
Winchester, VA, Winchester Regional, NDB OR GPS-B, Orig

[FR Doc. 96-24741 Filed 9-25-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-24733 Migratory Bird Hunting; Final Frameworks for Late-Season Migratory Bird Hunting Regulations
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50662-50681]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24733]

      

[[Page 50661]]

_______________________________________________________________________

Part VIII

Department of the Interior

_______________________________________________________________________

Fish and Wildlife Service

_______________________________________________________________________

50 CFR Part 20

Final Frameworks for Late-Season Migratory Bird Hunting Regulations; 
Final Rule

Federal Register / Vol. 61, No. 188 / Thursday, September 26, 1996 / 
Rules and Regulations

[[Page 50662]]

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 20

RIN 1018-AD69

Migratory Bird Hunting; Final Frameworks for Late-Season 
Migratory Bird Hunting Regulations

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule prescribes final late-season frameworks from which 
States may select season dates, limits, and other options for the 1996-
97 migratory bird hunting season. These late seasons include most 
waterfowl seasons, the earliest of which generally commence on or about 
October 1, 1996. The effects of this final rule are to facilitate the 
selection of hunting seasons by the States to further the annual 
establishment of the late-season migratory bird hunting regulations. 
State selections will be published in the Federal Register as 
amendments to Secs. 20.104 through 20.107 and Sec. 20.109 of title 50 
CFR part 20.

EFFECTIVE DATE: September 26, 1996.

ADDRESSES: Season selections from States are to be mailed to: Chief, 
Office of Migratory Bird Management, U.S. Fish and Wildlife Service, 
Department of the Interior, ms 634--ARLSQ, 1849 C Street, NW., 
Washington, DC 20240. Comments received are available for public 
inspection during normal business hours in room 634, Arlington Square 
Building, 4401 N. Fairfax Drive, Arlington, Virginia.

FOR FURTHER INFORMATION CONTACT: Paul R. Schmidt, Chief, Office of 
Migratory Bird Management, U.S. Fish and Wildlife Service, (703) 358-
1714.

SUPPLEMENTARY INFORMATION: 

Regulations Schedule for 1996

    On March 22, 1996, the Service published in the Federal Register 
(61 FR 11992) a proposal to amend 50 CFR part 20. The proposal dealt 
with the establishment of seasons, limits, and other regulations for 
migratory game birds under Secs. 20.101 through 20.107, 20.109, and 
20.110 of subpart K. On June 13, 1996, the Service published in the 
Federal Register (61 FR 30114) a second document providing supplemental 
proposals for early- and late-season migratory bird hunting regulations 
frameworks. The June 13 supplement also provided detailed information 
on the 1996-97 regulatory schedule and announced the Service Migratory 
Bird Regulations Committee and Flyway Council meetings. On June 14, 
1996, the Service published in the Federal Register (61 FR 30490) a 
third document describing the Service's proposed 1996-97 regulatory 
alternatives for duck hunting and its intent to consider establishing a 
special youth waterfowl hunting day.
    On June 27, 1996, the Service held a public hearing in Washington, 
DC, as announced in the March 22 and June 14 Federal Registers, to 
review the status of migratory shore and upland game birds. The Service 
discussed hunting regulations for these species and for other early 
seasons. On July 22, 1996, the Service published in the Federal 
Register (61 FR 37994) a fourth document specifically dealing with 
proposed early-season frameworks for the 1996-97 season. This document 
also extended the public comment period to August 1, 1996, for early-
season proposals. This rulemaking establishes final frameworks for 
early-season migratory bird hunting regulations for the 1996-97 season.
    On August 2, 1996, a public hearing was held in Washington, DC, as 
announced in the March 22, June 14, and July 22 Federal Registers, to 
review the status of waterfowl. Proposed hunting regulations were 
discussed for these late seasons. On August 15, 1996, (61 FR 42506), 
the Service published a fifth and sixth document on migratory bird 
hunting. The fifth document dealt specifically with proposed frameworks 
for the 1996-97 late-season migratory bird hunting regulations. The 
sixth document proposed establishing a youth waterfowl hunting day for 
the 1996-97 duck-hunting season. On August 29, 1996, the Service 
published a seventh document containing final frameworks for early 
migratory bird hunting seasons from which wildlife conservation agency 
officials from the States, Puerto Rico, and the Virgin Islands selected 
early-season hunting dates, hours, areas, and limits.
    On August 30, 1996, the Service published in the Federal Register 
(61 FR 45836) an eighth document consisting of a final rule amending 
subpart K of title 50 CFR part 20 to set hunting seasons, hours, areas, 
and limits for early seasons. This document, which establishes final 
frameworks for late-season migratory bird hunting regulations for the 
1996-97 season, is the ninth in the series.

Review of Comments and the Service's Response

    Public-hearing and written comments received through September 6, 
1996, relating to proposed late-season frameworks, are discussed and 
addressed here. Two individuals presented statements at the August 2, 
1996, public hearing. They were: Joe Kramer, representing the Central 
Flyway Council and Bruce Barbour, representing National Audubon 
Society. The Service received 28 written comments that specifically 
addressed late-season issues. These late-season comments are summarized 
and discussed in the subject order used in the March 22, 1996, Federal 
Register. Only the numbered items pertaining to late seasons for which 
comments were received are included. Flyway Council recommendations 
shown below include only those involving changes from the 1995-96 late-
season frameworks. For those topics where a Council recommendation is 
not shown, the Council supported continuing the same frameworks as in 
1995-96.

General

    Written Comments: The Humane Society of the United States (Humane 
Society) expressed concern that the public was not well represented in 
the regulations-development process and requested establishment of a 
system directly involving the non-hunting public. In addition, they 
recommended that the Service undertake efforts to obtain population 
estimates for all hunted species. Finally, they recommended pre-sunrise 
shooting be disallowed.
    Service Response: When the preliminary proposed rulemaking document 
was published in the Federal Register on March 22, 1996, the Service 
announced the comment periods for the early-season and late-season 
proposals and gave notice that the process of promulgating hunting 
regulations ``must, by its nature, operate under time constraints.'' 
Ample time must be given to gather and interpret survey data, consider 
recommendations and develop proposals, and to receive public comment. 
Scheduled dates are set to give the greatest possible opportunity for 
public input. The Service is obligated to, and does, give serious 
consideration to all information received as public comment. The 
Service has long recognized the problems associated with the length of 
time necessary to establish the final frameworks, and in conjunction 
with States, Flyway Councils, and the public, continues to seek new 
ways to streamline and improve the regulatory process.
    Regarding the Service's efforts to obtain population estimates, the 
long-term objectives of the Service include providing opportunities to 
harvest

[[Page 50663]]

portions of certain migratory game bird populations and to limit 
harvests to levels compatible with each population's ability to 
maintain healthy, viable numbers. Annually, the Service evaluates the 
status of populations and considers the potential impacts of hunting. 
The Service believes that the hunting seasons provided herein are 
consistent with the current status of waterfowl populations and long-
term population goals.
    In regard to shooting hours, the Service has compiled information 
which demonstrates that shooting hours beginning one-half hour before 
sunrise do not contribute significantly to the harvest of nontarget 
species. Consistent with the Service's long-term strategy for shooting 
hours, published in the September 21, 1990, Federal Register (55 FR 
388898), the frameworks herein provide for shooting hours of one-half 
hour before sunrise to sunset, unless otherwise specified.

1. Ducks

    The categories used to discuss issues related to duck harvest 
management are as follows: (A) General Harvest Strategy, (B) Framework 
Dates, (C) Season Length, (E) Bag Limits, (F) Zones and Split Seasons, 
and (G) Special Seasons/Species Management. Only those categories 
containing substantial recommendations are included below.

A. General Harvest Strategy

    Council Recommendations: The Atlantic Flyway Council, the Upper-
Region Regulations Committee of the Mississippi Flyway Council, the 
Central Flyway Council, and the Pacific Flyway Council recommended 
adopting the ``liberal'' alternative for the 1996-97 duck hunting 
season.
    The Lower-Region Regulations Committee of the Mississippi Flyway 
Council recommended some specific modifications to the ``liberal'' 
alternative. These modifications are detailed in B. Framework Dates, C. 
Season Length, and E. Bag Limits.
    Written Comments: Senator John Breaux of Louisiana asked for 
consideration of the Lower-Region Regulations Committee of the 
Mississippi Flyway Council's recommendation.
    Senators Thad Cochran and Trent Lott of Mississippi, John Breaux 
and Bennett Johnston of Louisiana, and Richard Shelby of Alabama, 
supported the recommendations of the Lower-Region Regulations Committee 
of the Mississippi Flyway Council.
    The Wildlife Management Institute (WMI) supported the Service's 
proposed frameworks for late-season hunting regulations. WMI supported 
adaptive harvest management (AHM) and believed that recent attempts by 
some States to circumvent the established regulatory process threatens 
the future of AHM as a useful process.
    The National Wildlife Federation concurred with the Service's 
proposal to generally maintain harvest levels similar to last year, 
with some areas slightly increased.
    Service Response: Beginning in 1995, the Service, Flyway Councils, 
and States introduced a new approach to the regulation of duck 
harvests, called Adaptive Harvest Management (AHM). An integral part of 
this harvest-management approach is the cooperative establishment of a 
set of regulatory alternatives that includes specified season lengths 
and bag limits for restrictive, moderate, and liberal seasons. The 
alternatives established for this year's hunting season are similar to 
those of the 1995 season and are the result of extensive discussions 
with the Flyway Councils and States since last January, as well as 
involvement by the public during an open comment period.
    The estimate of total ducks this year is 16 percent higher than the 
long-term average and several species are at record levels. The outlook 
for production is excellent and the 1996 fall flight will be comparable 
to those observed during the 1970s. Based on favorable input, the 
Service seeks to continue use of the AHM approach initiated last year. 
The AHM strategy for 1996 prescribes the liberal regulatory alternative 
based on high mallard and pond numbers.
    The frameworks recommended by the Lower-Region Regulations 
Committee of the Mississippi Flyway Council differed from those in the 
``liberal'' alternative established earlier this year. The Service's 
proposal is consistent with the ``liberal'' alternative outlined in the 
July 22 Federal Register and was supported by the other three Flyway 
Councils as well as the Mississippi Flyway Council's Upper-Region 
Regulations Committee.
    The Service recognizes the need to address the issue of harvest 
opportunity for species other than mallards that may be at or above 
objective population levels. Consequently, as part of the continuing 
development of AHM, the Service and Flyway Councils will soon begin a 
comprehensive review of regulatory alternatives, including all aspects 
of duck hunting regulations, in preparation for the 1997-98 hunting 
season.
    Additionally, in the July 22, 1996, Federal Register, the Service 
reported that all four Flyways continued to express support for the AHM 
approach, but that the Mississippi and Central Flyway Councils had 
recommended some specific modifications to the harvest-management 
objective (objective function). The Service and Flyway Councils have 
examined the role of the North American Waterfowl Management Plan 
(NAWMP) in harvest management and have explored a range of possible 
objectives designed to balance harvest and population goals. The 
Service emphasizes that population goals are not necessary for ensuring 
resource persistence if the basic objective is one of maximizing long-
term cumulative harvest. In this sense, the NAWMP is neither a system 
for regulating harvest nor a substitute for Flyway management. However, 
NAWMP goals do provide a means to reflect non-harvest conservation 
values, an ecosystem context for management, and a potential vehicle 
for future integration of harvest and habitat management.
    Based on recommendations from the Flyway Councils, the Service has 
decided to adopt a harvest-management objective that implements a 
proportional decrease in harvest value when the mallard population is 
expected to recede from the NAWMP goal. This change in harvest-
management objective results in a somewhat more liberal harvest 
strategy than that used in 1995, all other things being equal. However, 
the Service notes that: (1) a proportional decrease in harvest value 
provides a reasonable balance of harvest and population goals, while 
still calling for very restrictive seasons with low pond and mallard 
numbers; and (2) the frequency of regulatory changes and potential for 
closed seasons are expected to be lower when compared with the 
objective function from 1995.

B. Framework Dates

    Council Recommendations: The Lower-Region Regulations Committee of 
the Mississippi Flyway Council recommended fixed September 28 and 
January 23 framework dates.
    Written Comments: Senators Thad Cochran and Trent Lott of 
Mississippi recommended an experimental January 31 framework closing 
date for Mississippi.
    The Delta Outfitters Association of Mississippi and the Delta 
Wildlife Foundation of Mississippi requested a January 31 framework 
closing date for Mississippi, citing scientific benefits, habitat 
incentives, equal hunting opportunities, and additional economic income 
for Mississippi.
    An individual from Texas recommended extending the season through 
the second week of February.

[[Page 50664]]

    The Humane Society recommended that all seasons open at noon on 
Wednesdays in order to reduce the high level of harvest associated with 
traditional Saturday season openings. Furthermore, the Humane Society 
recommended that season openings be delayed by two weeks in all 
breeding areas in order to allow ducks time to leave natal marshes 
before being subjected to hunting pressure.
    Service Response: Regarding the Mississippi Flyway Council's Lower-
Region Regulations Committee recommendation of fixed framework dates, 
the Service responded last year in the September 27, 1995, Federal 
Register (60 FR 50042) that to maintain consistency among Flyways in 
the procedures for selecting framework dates, and because floating 
dates have been recommended annually for the Mississippi Flyway in 
recent years, it returned to the traditional procedure using fixed 
calendar dates for the Atlantic Flyway and floating dates for the 
Mississippi, Central, and Pacific Flyways. All floating dates would be 
oriented to the October 1 - January 20 period. Further, the Service 
reiterated its previously-stated policy to retain the option of using 
framework dates as a harvest-management tool. Traditionally, framework 
opening and closing dates have been oriented to the period October 1 - 
January 20, either as fixed calendar dates or ``floating'' dates, using 
as a guideline the Saturday nearest October 1 and the Sunday nearest 
January 20 to select opening and closing dates annually. In recent 
years, the Service has established fixed calendar dates of October 1 - 
January 20 for all Flyways. The fixed calendar dates of September 28 - 
January 23 recommended for the Mississippi Flyway this year would 
provide consistently wider frameworks over the years than the fixed 
October 1 - January 20 dates for the Atlantic Flyway and the floating 
dates for the Central and Pacific Flyways.
    Regarding the requests for a January 31 framework closing date in 
Mississippi, we reiterate our long-standing concerns that hunting 
disturbance in late winter may interfere with pair bonding and inhibit 
nutrient acquisition and storage with subsequent impacts to 
reproductive potential. However, we continue to support investigations 
by the AHM technical working group to assess the suitability of all 
aspects of the current regulatory alternatives, including framework 
dates. Before the Service can consider changes to the timing of the 
framework closing date, additional information to alleviate these 
concerns is necessary.
    Regarding the Humane Society's recommendation for Wednesday season 
openings, the Service has previously stated in the Federal Register (58 
FR 50190) that a State may choose to delay its opening date to 
correspond with a particular day of the week or to close earlier to 
maximize the number of weekends that hunting is allowed.

C. Season Length

    Council Recommendations: The Lower-Region Regulations Committee of 
the Mississippi Flyway Council recommended a 53-day season.
    Written Comments: Congressman Jimmy Hayes of Louisiana requested 
the Service grant the Louisiana Department of Wildlife and Fisheries' 
request to extend the season by 3 days.
    Service Response: The Service responded in the July 22, 1996, 
Federal Register that it believes that any modifications to season 
length under the three regulatory alternatives must be approached 
carefully, with due consideration to differences among Flyways. Current 
differences in season length among the Flyways are predicated on 
historic (ca. 1950) patterns of duck abundance and hunter activity, 
with longer seasons available to Flyways with relatively more ducks and 
fewer hunters. Further, the Service believes that a thorough review of 
Flyway differences in season lengths is needed and is seeking technical 
guidance from the Flyway Councils, the AHM technical working group, and 
others. Current differences in hunter activity and duck abundance, as 
well as the origin and status of duck stocks contributing to each 
Flyway, should be investigated using recent data and current analytical 
techniques. Until such analyses are conducted, the Service is concerned 
that changes in season lengths contained in the regulatory alternatives 
could alter the allocation of harvest in unpredictable, undesirable or 
inappropriate ways. Therefore, the Service prefers to approach all 
proposed changes to season length, regardless of the number of days 
involved, in a systematic and comprehensive manner.

E. Bag Limits

    Council Recommendations: The Lower-Region Regulations Committee of 
the Mississippi Flyway Council recommended a 6-duck daily bag limit, 
including no more than 4 mallards (no more than 1 of which could be a 
hen), 4 mottled ducks, 4 scaup, 4 ringnecks, 4 goldeneyes, 4 
buffleheads, 2 wood ducks, 2 redheads, 2 canvasbacks, 1 pintail, and 1 
black duck.
    Written Comments: Senators Thad Cochran and Trent Lott of 
Mississippi recommended an experimental 6-bird daily bag limit for 
Mississippi.
    The Delta Outfitters Association of Mississippi and the Delta 
Wildlife Foundation of Mississippi requested a 6-bird daily bag limit 
for Mississippi.
    An individual from Texas recommended a 5-bird daily bag limit, 
including at least 2 pintails and 2 redheads. Another individual from 
Texas recommended a 5-bird daily bag limit, including 2 to 3 pintails.
    Service Response: The Service responded in the July 22, 1996, 
Federal Register that it cannot support the proposal of the Lower-
Region Regulations Committee of the Mississippi Flyway Council to 
increase the overall bag limit in the ``liberal'' alternative from 5 to 
6 in order to provide additional hunting opportunity on several 
abundant species. The Service believes that major changes to the 
regulatory alternatives should be addressed in a deliberate and 
comprehensive manner. Historic efforts at species-specific management 
have been predicated largely on the assumptions that: (a) mallard 
harvest rates can be used as a standard by which to judge the 
appropriateness of harvest rates for other species; (b) target stocks 
of ducks can be isolated in time or space, or that hunters can shoot 
selectively; and (c) that management costs are largely fixed, whether 
managing one stock or many. Recent information has led the Service to 
question the validity of these assumptions. The Service believes that a 
number of issues must be addressed prior to major reforms in species-
specific harvest strategies: (1) how much must species or populations 
differ in terms of their population dynamics to warrant differential 
harvest regulations? (2) what are the relative costs and benefits of 
managing individual duck stocks? (3) what is the ability of hunters to 
harvest selectively? and (4) do hunters prefer the maximum hunting 
opportunity afforded by complex regulations or simpler hunting 
regulations that offer less hunting opportunity? The Service awaits 
further guidance from the Councils and the AHM technical working group 
before considering significant changes to species-specific bag limits.

F. Zones and Split Seasons

    Council Recommendations: The Atlantic Flyway Council recommended 
that the Service implement the proposed changes to guidelines for the 
use of zones and split seasons, and determine if States could be 
allowed to

[[Page 50665]]

have 3 zones, with split seasons in each, where the numbers of hunters 
and ducks harvested in one or more zones would be very small.
    The Upper-Region Regulations Committee of the Mississippi Flyway 
Council recommended an additional option of 3 zones and 2-way splits be 
provided as a regular option to all States in 1997.
    Written Comments: The Illinois Department of Natural Resources, the 
Ohio Division of Wildlife, and the Wisconsin Department of Natural 
Resources requested the Service add the option of 3 zones and 2-way 
splits in one or more zones to the 1996-2000 zones and splits 
guidelines. Collectively, they believe that delay in the consideration 
of this recommendation until the next open period in 2001 is 
unreasonable and further request that States would have up to 1 year to 
select this option (prior to the 1997 season).
    The Wyoming Game and Fish Department (Wyoming) appreciated the 
proposed approval of their zone/split configuration for the 1996-2000 
period. However, they recommended the Service establish more detailed 
requirements on the minimum acceptable zone width for use during the 
next open season. Wyoming believed that guidelines should be 
sufficiently clear to prevent unintended interpretations and explicit 
regarding their intent. Finally, Wyoming believed that States with 
diverse, non-contiguous physiography should be allowed exceptions to 
the existing guidelines.
    An individual from Wyoming requested the Service's guidelines allow 
non-contiguous zones. One individual from Indiana desired for a fourth 
zone in Indiana while another requested consideration for allowing 
changes to Indiana's zone boundaries. An individual from Maine 
recommended the Service consider Maine's proposal to change zone 
boundaries and create an additional zone citing the loss of late season 
hunting opportunities due to cold weather.
    The Humane Society urges the Service to discontinue all split and 
special seasons and recommends that any State establishing such seasons 
reduce the total number of hunting days by a minimum of 10 days.
    Service Response: For the 1996 open season, the Service provided 
final guidelines on the use of zones and split seasons for the 1996-
2000 period in the July 22, 1996, Federal Register. As we previously 
stated, the Service established these guidelines in 1990 (Federal 
Register, 55 FR 38901) following extensive review and endorsement of 
the Flyway Councils and Technical Sections. The primary purpose of the 
guidelines was to provide a framework for controlling the proliferation 
of changes in zone and split options, which compromise our ability to 
measure impacts of various regulatory changes on harvest. The 
guidelines were not developed preferentially according to the 
geographic size of any State, but rather, were administered equally to 
all States. We continue to believe that the guidelines must be applied 
fairly and consistently to all States in order to prevent further 
proliferations in zone/split configurations and that current guidelines 
offer States sufficient flexibility to address unique differences in 
physiograpy, climate, and biology. However, we will work with the 
Flyway Councils to cooperatively review these guidelines, as well as 
those concerns identified above, prior to the next scheduled open 
season in 2001.
    With respect to Wyoming's recommendation for increased levels of 
detail in existing guidelines, we believe the guidelines should only be 
as detailed as necessary to achieve the desired intent, while allowing 
as much flexibility as possible in selecting a zone/split 
configuration.
    In regard to the recommendation that split and special seasons be 
discontinued, the Service notes that States always have the option of 
selecting a continuous season with no splits. Furthermore, the Service 
is not aware of any information that split seasons are causing 
detrimental impacts to populations.

G. Special Seasons/Species Management

    Written Comments: WMI believes the Service must aggressively 
develop processes for management of harvest programs for species that 
do not easily fall under the existing scientific base for AHM.
    Service Response: The Service is committed to working with the 
Flyway Councils and States to address those species that may not be 
managed optimally with the existing AHM framework. However, the Service 
believes that species-specific harvest strategies should be developed 
in a deliberate and comprehensive manner, and that a number of issues 
must be addressed prior to major changes. These issues were described 
in the July 22, 1996, Federal Register (61 FR 37999). The Service will 
soon undertake a comprehensive review of species-specific harvest 
management and will actively seek advice on appropriate approaches from 
the Flyway Councils, States, and the public.
i. Black Ducks
    Council Recommendations: The Atlantic Flyway Council recommended 
that the individual Atlantic Flyway States achieve a 40 percent 
reduction in their black duck harvest during the 1996-97 season 
compared with the 1977-81 base-line harvest.
    Written Comments: An individual from Maine questioned the need for 
black duck harvest reductions.
    Service Response: The Service agrees with the Atlantic Flyway 
Council's recommendation and acknowledges the Council's concern for the 
population status of black ducks. Black duck populations remain below 
the NAWMP goal and while the decline seems to have halted, little 
increase is evident. The Service believes the harvest restrictions 
identified in the 1983 Environmental Assessment should be maintained 
until a revised harvest strategy is developed.
ii. Canvasbacks
    Council Recommendations: The Lower-Region Regulations Committee of 
the Mississippi Flyway Council recommended a daily bag limit of 2 
canvasbacks.
    Written Comments: An individual from Washington recommended a daily 
bag limit of 2 canvasbacks.
    Service Response: The Service continues to support the canvasback 
harvest strategy adopted in 1994. Current population and habitat status 
suggests that a daily bag limit of 1 canvasback during the 1996-97 
season will result in a harvest within levels allowed by the strategy. 
The Service believes that it has insufficient experience with this 
harvest strategy to consider modifications at this time, and is 
concerned that an overly aggressive strategy could precipitate a return 
to closed seasons. The Service will continue to monitor the performance 
of the current strategy for canvasbacks.

4. Canada Geese

    Council Recommendations: The Upper-Region Regulations Committee of 
the Mississippi Flyway Council recommended several changes in Canada 
goose quotas, season lengths, etc., based on population status and 
management plans.
    The Upper-Region Regulations Committee of the Mississippi Flyway 
Council recommended the Service allow 3-way splits for goose seasons. 
The Council further recommended that 3-way split seasons for Canada 
geese require both Council and Service

[[Page 50666]]

approval and a 3-year evaluation by each participating State.
    The Lower-Region Regulations Committee of the Mississippi Flyway 
Council recommended a dark goose daily bag limit of 3 Canada geese, 2 
white-fronted geese, and 2 brant.
    The Central Flyway Council recommended a 4-bird dark goose 
aggregate bag limit in the west-tier States, except for the Western 
Goose Zone of Texas.
    The Pacific Flyway Council recommended a closing framework date in 
the NW Oregon Special Permit Zone of the Sunday closest to February 28. 
During the extended period, hunting would occur one day per week. The 
Council also recommended the morphological definition of a dusky Canada 
goose be defined as dark-breasted (Munsell 10YR color value of 5 or 
less) with a culmen measurement of 40 to 50 millimeters.
    Written Comments: The NWF supported the general suspension of the 
regular season on Canada geese in the Atlantic Flyway.
    Service Response: The Service concurs with the above 
recommendations regarding bag limits in the Mississippi and Central 
Flyways and the Pacific Flyway Council's recommendation for a framework 
closing date of February 28 in the NW Oregon Special Permit Zone. 
Further, the Service also concurs with the Upper-Region Regulations 
Committee of the Mississippi Flyway Council's recommendation on 3-way 
split seasons for Canada geese.
    The Service concurs with the need for a uniform classification 
procedure to determine the harvest of dusky Canada geese in the quota 
zones in Washington and Oregon. The Service also agrees with the 
criteria proposed by the Pacific Flyway Council for this purpose. The 
Service would encourage the Pacific Flyway to continue to evaluate 
these criteria to ensure that the harvest management objectives are 
met.

C. Special Late Seasons

    Council Recommendations: The Atlantic Flyway Council recommended 
new experimental late seasons for resident geese in Maryland, Rhode 
Island, and Virginia, and additional days and area modifications for 
existing seasons in Georgia, Massachusetts, New Jersey, New York, 
Pennsylvania, and South Carolina.
    The Upper-Region Regulations Committee of the Mississippi Flyway 
Council recommended the special late season in the Fergus Falls/
Alexandria Goose Zone of Minnesota be made operational.
    The Pacific Flyway Council recommended a daily bag and possession 
limit of 2 and 4 cackling Canada geese, respectively, in the SW 
Washington Special Goose Zone during the February 5 to March 10 late 
season.
    Written Comments: The NWF stressed the importance of setting 
regulations that would increase the harvest of resident geese in the 
Atlantic Flyway while decreasing or eliminating harvest on migrant 
populations.
    The Humane Society opposed the proposed late season Canada goose 
hunts, citing that such hunts fail to target the goose populations 
ostensibly responsible for conflicts with humans.
    Service Response: The Service concurs with the Atlantic Flyway 
Council's recommendations to expand seasons in those areas that meet 
existing criteria. Several new seasons were initiated this year and 
many others were expanded to increase harvest of resident birds in lieu 
of the closed season on the migrant Atlantic Population. However, these 
seasons are experimental and the Service encourages all States to 
initiate or continue existing evaluations to assess the potential 
impacts on the migratory population.
    The Service also concurs with the Mississippi Flyway Council's 
Upper-Region Regulations Committee recommendation on the special late 
season in the Fergus Falls/Alexandria Goose Zone of Minnesota and the 
Pacific Flyway Council's recommendation on cackling Canada geese in the 
SW Washington Special Goose Zone.
    Regarding the Humane Society's comment that such hunts fail to 
target specific populations, we recognize the problems caused by 
increasing populations of resident geese and the continuing concern for 
the status of certain migratory flocks. However, as we stated 
previously, we remain committed to targeting these special seasons at 
locally-breeding and/or injurious Canada goose populations. The Service 
and the Flyway Councils have cooperatively reviewed and structured 
these special seasons to protect migratory flocks and target specific 
locally-breeding populations. The Service does not wish to increase the 
composition of migrants in the harvest beyond that which is currently 
identified in the criteria for these seasons.

6. Brant

    Council Recommendations: The Atlantic Flyway Council recommended a 
30-day Atlantic brant season with a 2-bird daily bag limit.
    Service Response: The Service concurs with the Atlantic Flyway 
Council's recommendation to reduce the season length as prescribed in 
the interim hunt plan.

7. Snow and Ross's Geese

    Council Recommendations: The Atlantic Flyway Council recommended a 
March 10 framework closing date with a daily bag and possession limit 
of 8 and 24, respectively. The Council also recommended allowing the 
season to be split into three segments.
    The Upper-Region and Lower-Region Regulations Committees of the 
Mississippi Flyway Council recommended a March 10 framework closing 
date with a daily bag and possession limit of 10 and 30, respectively.
    The Central Flyway Council recommended a March 10 framework closing 
date, except for Federal and State lands in the Rainwater Basin 
counties in Nebraska, with a daily bag and possession limit of 10 and 
40, respectively.
    Written Comments: The Nebraska Game and Parks Commission (Nebraska) 
recommended the closing framework for the 17 Rainwater Basin counties 
in south-central Nebraska be extended from the Sunday nearest February 
15 (February 16, 1997) to March 10, 1997, except for lands owned by the 
Service and the Nebraska Game and Parks Commission. Nebraska believed 
this mixture of open and closed areas would provide adequate protection 
for other species of migratory birds and not impact the public from 
viewing concentrations of migratory birds.
    In a second alternative proposal, Nebraska recommended the proposed 
county boundary be changed to existing roads, highways, and the Platte 
River. This change would provide a more identifiable boundary for 
hunters and allow some areas to be included for study in that portion 
of the Basin that will be hunted until March 10. The results of these 
studies would allow more objective establishment of late-season snow 
goose regulations in the future.
    An individual from Wyoming requested a March 10 framework closing 
date. An individual from Nebraska recommended a March 10 framework 
closing date and inclusion of the Rainwater Basin counties in the snow 
goose hunt area.
    Service Response: The Service concurs with the requests to extend 
the framework closing date for light geese to March 10 in the Atlantic, 
Mississippi, and Central Flyways, but believes that this extension 
should be limited to areas

[[Page 50667]]

that do not pose a threat to the management and welfare of other 
migratory bird species during the spring migration and nesting period. 
In this regard, the Service appreciates the comments from Nebraska; 
however, we do not support the original proposal that would allow for a 
mixture of open and closed areas in the Rainwater Basin counties for 
snow goose hunting until March 10. The Service believes hunting could 
result in disturbance to other migratory birds and alter natural 
distributions of waterfowl. This important spring staging area provides 
critical habitat for many species of migratory birds, and the impacts 
of hunting have not been adequately studied. In addition, potential 
impacts to eco-tourism, endangered species, and disease management have 
not been adequately addressed.
    The alternative proposal which more clearly delineates the 
boundaries according to existing roads and highways, is generally 
acceptable to the Service. However, the Service continues to have 
concerns over late-season snow goose hunting along the Big Bend reach 
of the Platte River. The proposed east and south boundaries would allow 
hunting on some of the southern-most basins and on Harlan County 
Reservoir. These additional hunting opportunities will allow for 
studies to assess the impact of hunting on distributions of migratory 
birds.
    Therefore, the Service will allow light goose hunting in Nebraska 
until March 10 except in the area bounded by: the intersection of the 
Platte River and U.S. Highway (Hwy) 92 in Polk County, east on Hwy 92 
to NE Hwy 15, south on Hwy 15 to NE Hwy 4, west on NE Hwy 4 to U.S. Hwy 
34, west on U.S. Hwy 34 to U.S. Hwy 283, north on U.S. Hwy 283 to U.S. 
Hwy 30, east on U.S. Hwy 30 to U.S. Hwy 281, south on U.S. Hwy 281 to 
NE Hwy 34 & 2, east on NE Hwy 34 to the Platte River, and then north 
and east along the Platte River to the beginning. In this area, the 
closing date will be the Sunday nearest February 15 (February 16, 
1997).

8. Swans

    Council Recommendations: The Atlantic Flyway Council recommended 
that 5600 tundra swan permits be issued for the 1996-97 season. The 
Council recommended that North Carolina receive 5,000 permits and 
Virginia 600. The Council also recommended eliminating the requirement 
that tundra swan seasons must be held during snow goose seasons.
    Written Comments: The Humane Society requested that the Service 
close all swan hunting seasons, citing that tundra swan seasons were 
impeding, if not preventing, winter range expansion and recovery of 
trumpeter swans.
    Service Response: The Service concurs with the Atlantic Flyway 
Council's recommendation to reduce the number of permits issued in the 
Flyway to 5,600 and to eliminate the requirement that these seasons are 
concurrent with the light goose season. The Service supports the 
Flyway's effort to carefully monitor the harvest and status of the 
Eastern Population of tundra swans and encourages the completion of the 
revisions to the management plan.
    In regards to the Humane Society's comment, we would refer to our 
detailed response in the September 27, 1995, Federal Register (60 FR 
50042) concerning the establishment of a general swan season. Enhancing 
Rocky Mounting Population trumpeter swan range expansion while 
retaining most aspects of tundra swan hunting were covered in detail in 
our 1995 Environmental Assessment ``Proposal to Establish General Swan 
Seasons in Parts of the Pacific Flyway for the 1995-99 Seasons'' 
(August 1995) which compares various alternative strategies for 
reconciling conflicting swan management strategies. Copies are 
available from the Service at the address indicated under the caption 
ADDRESSES.

23. Other

    Written Comments: The Concerned Coastal Sportsmen's Association, a 
local organization in Massachusetts, requested compensatory days for 
those States that prohibit Sunday hunting.
    Service Response: The Service has previously stated its position on 
this issue in the September 24, 1993, Federal Register (58 FR 50188), 
but has recently agreed to work with the Atlantic Flyway Council to 
review and clarify various technical and policy concerns. While this 
assessment is still pending, the Service will continue its long-held 
policy for the 1996-97 season that all States should be treated equally 
under existing Federal regulations and allowed similar frameworks 
within each Flyway to hunt migratory birds.

NEPA Consideration

    NEPA considerations are covered by the programmatic document, 
``Final Supplemental Environmental Impact Statement: Issuance of Annual 
Regulations Permitting the Sport Hunting of Migratory Birds (FSES 88-
14),'' filed with EPA on June 9, 1988. The Service published a Notice 
of Availability in the June 16, 1988, Federal Register (53 FR 22582). 
The Service published its Record of Decision on August 18, 1988 (53 FR 
31341). Copies of these documents are available from the Service at the 
address indicated under the caption ADDRESSES.

Endangered Species Act Consideration

    As in the past, the Service designs hunting regulations to remove 
or alleviate chances of conflict between migratory game bird hunting 
seasons and the protection and conservation of endangered and 
threatened species. Consultations have been conducted to ensure that 
actions resulting from these regulatory proposals will not likely 
jeopardize the continued existence of endangered or threatened species 
or result in the destruction or adverse modification of their critical 
habitat. Findings from these consultations are included in a biological 
opinion and may cause modification of some regulatory measures 
previously proposed. The final frameworks reflect any modifications. 
The Service's biological opinions resulting from its Section 7 
consultation are public documents available for public inspection in 
the Service's Division of Endangered Species and MBMO, at the address 
indicated under the caption ADDRESSES.

Executive Order (E.O.) 12866

    This rule is economically significant and was reviewed by the 
Office of Management and Budget (OMB) under E.O. 12866.

Congressional Review

    In accordance with Section 251 of the Small Business Regulatory 
Enforcement Fairness Act of 1996 (5 U.S.C. 8), this rule has been 
submitted to Congress and has been declared major. Because this rule 
establishes hunting seasons, this rule qualifies for an exemption under 
5 U.S.C. 808(1); therefore, the Department determines that this rule 
shall take effect immediately.

Regulatory Flexibility Act

    These regulations have a significant economic impact on a 
substantial number of small entities under the Regulatory Flexibility 
Act (5 U.S.C. 601 et seq). In the March 22, 1996, Federal Register, the 
Service reported measures it took to comply with requirements of the 
Act. One measure was to prepare a Small Entity Flexibility Analysis 
(Analysis) documenting the significant beneficial economic effects on a 
substantial number of small entities. The Analysis estimated that 
migratory bird hunters would spend between $254 and $592 million at 
small businesses in 1996. Copies of the Analysis are

[[Page 50668]]

available upon request from the Office of Migratory Bird Management.

Paperwork Reduction Act

    The Department examined these regulations under the Paperwork 
Reduction Act of 1995. The various information collection requirements 
are utilized in the formulation of migratory game bird hunting 
regulations. OMB has approved these information collection requirements 
and assigned clearance number 1018-0015.

Regulations Promulgation

    The rulemaking process for migratory game bird hunting must, by its 
nature, operate under severe time constraints. However, the Service 
intends that the public be given the greatest possible opportunity to 
comment on the regulations. Thus, when the preliminary proposed 
rulemaking was published, the Service established what it believed were 
the longest periods possible for public comment. In doing this, the 
Service recognized that when the comment period closed, time would be 
of the essence. That is, if there were a delay in the effective date of 
these regulations after this final rulemaking, the States would have 
insufficient time to select season dates and limits; to communicate 
those selections to the Service; and to establish and publicize the 
necessary regulations and procedures to implement their decisions.
    Therefore, the Service, under authority of the Migratory Bird 
Treaty Act (July 3, 1918), as amended, (16 U.S.C. 703-711), prescribes 
final frameworks setting forth the species to be hunted, the daily bag 
and possession limits, the shooting hours, the season lengths, the 
earliest opening and latest closing season dates, and hunting areas, 
from which State conservation agency officials may select hunting 
season dates and other options. Upon receipt of season and option 
selections from these officials, the Service will publish in the 
Federal Register a final rulemaking amending 50 CFR part 20 to reflect 
seasons, limits, and shooting hours for the conterminous United States 
for the 1995-96 season.
    The Service therefore finds that ``good cause'' exists, within the 
terms of 5 U.S.C. 553(d)(3) of the Administrative Procedure Act, and 
these frameworks will, therefore, take effect immediately upon 
publication.

Unfunded Mandates

    The Service has determined and certifies in compliance with the 
requirements of the Unfunded Mandates Act, 2 U.S.C. 1502 et seq., that 
this rulemaking will not impose a cost of $100 million or more in any 
given year on local or State government or private entities.

Civil Justice Reform - Executive Order 12988

    The Department, in promulgating this rule, has determined that 
these regulations meet the applicable standards provided in Sections 
3(a) and 3(b)(2) of Executive Order 12988.

List of Subjects in 50 CFR Part 20

    Exports, Hunting, Imports, Reporting and recordkeeping 
requirements, Transportation, Wildlife.
    The rules that eventually will be promulgated for the 1996-97 
hunting season are authorized under 16 U.S.C. 703-712 and 16 U.S.C. 742 
a--j.

Dated: September 17, 1996.
George T. Frampton, Jr.
Assistant Secretary for Fish and Wildlife and Parks.

Final Regulations Frameworks for 1996-97 Late Hunting Seasons on 
Certain Migratory Game Birds

    Pursuant to the Migratory Bird Treaty Act and delegated 
authorities, the Department has approved frameworks for season lengths, 
shooting hours, bag and possession limits, and outside dates within 
which States may select seasons for hunting waterfowl and coots between 
the dates of September 1, 1996, and March 10, 1997.

General

    Dates: All outside dates noted below are inclusive.
    Shooting and Hawking (taking by falconry) Hours: Unless otherwise 
specified, from one-half hour before sunrise to sunset daily.
    Possession Limits: Unless otherwise specified, possession limits 
are twice the daily bag limit.
    Definitions: For the purpose of hunting regulations listed below, 
the collective terms ``dark'' and ``light'' geese include the following 
species:
    Dark geese - Canada geese, white-fronted geese, brant, and all 
other goose species except light geese.
    Light geese - snow (including blue) geese and Ross' geese.
    Area, Zone, and Unit Descriptions: Geographic descriptions related 
to late-season regulations are contained in a later portion of this 
document.
    Area-Specific Provisions: Frameworks for open seasons, season 
lengths, bag and possession limits, and other special provisions are 
listed below by Flyway.

Atlantic Flyway

    The Atlantic Flyway includes Connecticut, Delaware, Florida, 
Georgia, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New 
York, North Carolina, Pennsylvania, Rhode Island, South Carolina, 
Vermont, Virginia, and West Virginia.

Ducks, Mergansers, and Coots

    Outside Dates: Between October 1 and January 20.
    Hunting Seasons and Duck Limits: 50 days and daily bag limit of 5 
ducks, including no more than 1 hen mallard, 1 black duck, 1 pintail, 1 
mottled duck, 1 fulvous whistling duck, 2 wood ducks, 2 redheads, and 1 
canvasback.
    Closures: The season on harlequin ducks is closed.
    Sea Ducks: In all areas outside of special sea duck areas, sea 
ducks are included in the regular duck daily bag and possession limits. 
However, during the regular duck season within the special sea duck 
areas, the sea duck daily bag and possession limits may be in addition 
to the regular duck daily bag and possession limits.
    Merganser Limits: The daily bag limit of mergansers is 5, only 1 of 
which may be a hooded merganser.
    Coot Limits: The daily bag limit is 15 coots.
    Lake Champlain Zone, New York: The waterfowl seasons, limits, and 
shooting hours shall be the same as those selected for the Lake 
Champlain Zone of Vermont.
    Zoning and Split Seasons: Delaware, Florida, Georgia, Maryland, 
North Carolina, Rhode Island, South Carolina, and Virginia may split 
their seasons into three segments; Connecticut, Maine, Massachusetts, 
New Hampshire, New Jersey, New York, Pennsylvania, Vermont, and West 
Virginia may select hunting seasons by zones and may split their 
seasons into two segments in each zone.

Canada Geese

    Season Lengths, Outside Dates, and Limits: The Canada goose season 
is suspended throughout the Flyway except as noted below. Unless 
specified otherwise, seasons may be split into two segments.
    Connecticut: A special experimental season may be held in the South 
Zone between January 15 and February 15, with 5 geese per day.
    Georgia: In specific areas, a 70-day experimental season may be 
held between November 15 and February 15, with a limit of 5 Canada 
geese per day.
    Maryland: An experimental season may be held in designated areas of

[[Page 50669]]

western Maryland from January 15 to February 15, with 5 geese per day.
    Massachusetts: In the Central Zone and a portion of the Coastal 
Zone, a season may be held from January 15 to February 15, with 5 geese 
per day.
    New Jersey: An expanded experimental season may be held in 
designated areas of North and South New Jersey from January 15 to 
February 15, with 5 geese per day.
    New York: An experimental season may be held between January 15 and 
February 15, with 5 geese daily in Westchester County and portions of 
Nassau, Orange, Putnam, and Rockland Counties.
    Pennsylvania: Erie, Mercer, and Butler Counties - 70 days between 
October 1 and January 31, with 1 goose per day through October 15; 2 
geese per day thereafter; 1 goose per day for the first 8 days after 
the opening.
    Crawford County - 35 days between October 1 and January 20; with 1 
goose per day.
    An expanded experimental season may be held in the designated areas 
of western Pennsylvania from January 15 to February 15 with 5 geese per 
day.
    Rhode Island: An experimental season may be held in a designated 
area from January 15 to February 15, with 5 geese per day,
    South Carolina: A 70-day special season may be held in the 
designated areas during November 15 to February 15, with a daily bag 
limit of 5 Canada geese per day.
    Virginia: An experimental season may be held from January 15 to 
February 15, with 5 geese per day, in all areas west of Interstate 95.
    West Virginia: 70 days between October 1 and January 20, with 3 
geese per day.

Light Geese

    Season Lengths, Outside Dates, and Limits: States may select a 107-
day season between October 1 and March 10, with 8 geese per day and 24 
in possession. States may split their seasons into three segments.

Brant

    Season Lengths, Outside Dates, and Limits: States may select a 30-
day season between October 1 and January 20, with 2 brant per day. 
States may split their seasons into two segments.

Mississippi Flyway

    The Mississippi Flyway includes Alabama, Arkansas, Illinois, 
Indiana, Iowa, Kentucky, Louisiana, Michigan, Minnesota, Mississippi, 
Missouri, Ohio, Tennessee, and Wisconsin.

Ducks, Mergansers, and Coots

    Outside Dates: Between the Saturday nearest October 1 (September 28 
) and the Sunday nearest January 20 (January 19).
    Hunting Seasons and Duck Limits: 50 days with a daily bag limit of 
5 ducks, including no more than 4 mallards (no more than 1 of which may 
be a female), 3 mottled ducks, 1 black duck, 1 pintail, 2 wood ducks, 1 
canvasback, and 2 redheads.
    Merganser Limits: The daily bag limit is 5, only 1 of which may be 
a hooded merganser.
    Coot Limits: The daily bag limit is 15 coots.
    Zoning and Split Seasons: Alabama, Illinois, Indiana, Iowa, 
Kentucky, Louisiana, Michigan, Mississippi, Missouri, Ohio, Tennessee, 
and Wisconsin may select hunting seasons by zones.
    In Alabama, Indiana, Iowa, Kentucky, Louisiana, Michigan, 
Mississippi, Ohio, Tennessee, and Wisconsin, the season may be split 
into two segments in each zone.
    In Minnesota and Arkansas, the season may be split into three 
segments.
    Pymatuning Reservoir Area, Ohio: The seasons, limits, and shooting 
hours shall be the same as those selected in the adjacent portion of 
Pennsylvania (Northwest Zone).

Geese

    Split Seasons: Seasons for geese may be split into three segments. 
Three-way split seasons for Canada geese require Mississippi Flyway 
Council and U.S. Fish and Wildlife Service approval, and a 3-year 
evaluation, by each participating State.
    Season Lengths, Outside Dates, and Limits: States may select 
seasons for geese not to exceed 70 days for dark geese between the 
Saturday nearest October 1 (September 28) and January 31, and 107 days 
for light geese between the Saturday nearest October 1 (September 28) 
and March 10. The daily bag limit is 10 light geese, 3 Canada geese, 2 
white-fronted geese, and 2 brant. The possession limit for light geese 
is 30. Specific regulations for Canada geese and exceptions to the 
above general provisions are shown below by State.
    Alabama: In the Southern James Bay Population (SJBP) Goose Zone, 
the season for Canada geese may not exceed 35 days. Elsewhere, the 
season for Canada geese may extend for 70 days in the respective duck-
hunting zones. The daily bag limit is 2 Canada geese.
    Arkansas: The season for Canada geese may extend for 23 days in the 
East Zone and 14 days in the West Zone. In both zones, the season may 
extend to February 15. The daily bag limit is 2 Canada geese. In the 
remainder of the State, the season for Canada geese is closed.
    Illinois: The total harvest of Canada geese in the State will be 
limited to 94,900 birds. Limits are 2 Canada geese daily and 10 in 
possession.
    (a) North Zone - The season for Canada geese will close after 93 
days or when 11,000 birds have been harvested in the Northern Illinois 
Quota Zone, whichever occurs first.
    (b) Central Zone - The season for Canada geese will close after 93 
days or when 17,600 birds have been harvested in the Central Illinois 
Quota Zone, whichever occurs first.
    (c) South Zone - The harvest of Canada geese in the Southern 
Illinois and Rend Lake Quota Zones will be limited to 36,600 and 10,400 
birds, respectively. The season for Canada geese in each zone will 
close after 84 days or when the harvest limit has been reached, 
whichever occurs first. In the Southern Illinois Quota Zone, if any of 
the following conditions exist after December 20, the State, after 
consultation with the Service, will close the season by emergency order 
with 48 hours notice:

    1. 10 consecutive days of snow cover, 3 inches or more in depth.
    2. 10 consecutive days of daily high temperatures less than 20 
degrees F.
    3. Average body weights of adult female geese less than 3,200 
grams as measured from a weekly sample of a minimum of 50 geese.
    4. Starvation or a major disease outbreak resulting in observed 
mortality exceeding 5,000 birds in 10 days, or a total mortality 
exceeding 10,000 birds.

    In the remainder of the South Zone, the season may extend for 84 
days or until both the Southern Illinois and Rend Lake Quota Zones have 
been closed, whichever occurs first.
    Indiana: The total harvest of Canada geese in the State will be 
limited to 24,200 birds.
    (a) Posey County - The season for Canada geese will close after 65 
days or when 4,350 birds have been harvested, whichever occurs first. 
The daily bag limit is 2 Canada geese.
    (b) Remainder of the State - The season for Canada geese may extend 
for 65 days in the respective duck-hunting zones, except in the SJBP 
Zone, where the season may not exceed 35 days. The daily bag limit is 2 
Canada geese.
    Iowa: The season may extend for 70 days. The daily bag limit is 2 
Canada geese.
    Kentucky
    (a) Western Zone - The season for Canada geese may extend for 65 
days

[[Page 50670]]

(80 days in Fulton County), and the harvest will be limited to 21,000 
birds. Of the 21,000-bird quota, 13,650 birds will be allocated to the 
Ballard Reporting Area and 3,990 birds will be allocated to the 
Henderson/Union Reporting Area. If the quota in either reporting area 
is reached prior to completion of the 65-day season, the season in that 
reporting area will be closed. If this occurs, the season in those 
counties and portions of counties outside of, but associated with, the 
respective subzone (listed in State regulations) may continue for an 
additional 7 days, not to exceed a total of 65 days (80 days in Fulton 
County). The season in Fulton County may extend to February 15. The 
daily bag limit is 2 Canada geese.
    (b) Pennyroyal/Coalfield Zone - The season may extend for 35 days. 
The daily bag limit is 2 Canada geese.
    (c) Remainder of the State - The season may extend for 50 days. The 
daily bag limit is 2 Canada geese.
    Louisiana: The season for Canada geese may extend for 9 days. 
During the season, the daily bag limit for Canada and white-fronted 
geese is 2, no more than 1 of which may be a Canada goose. Hunters 
participating in the Canada goose season must possess a special permit 
issued by the State.
    Michigan: The total harvest of Canada geese in the State will be 
limited to 53,300 birds.
    (a) North Zone - The framework opening date for all geese is 
September 28 and the season for Canada geese may extend for 20 days. 
The daily bag limit is 2 Canada geese.
    (b) Middle Zone - The season for Canada geese may extend for 20 
days. The daily bag limit is 2 Canada geese.
    (c) South Zone
    (1) Allegan County GMU - The season for Canada geese will close 
after 51 days or when 2,200 birds have been harvested, whichever occurs 
first. The daily bag limit is 1 Canada goose.
    (2) Muskegon Wastewater GMU - The season for Canada geese will 
close after 53 days or when 700 birds have been harvested, whichever 
occurs first. The daily bag limit is 2 Canada geese.
    (3) Saginaw County GMU - The season for Canada geese will close 
after 50 days or when 2,000 birds have been harvested, whichever occurs 
first. The daily bag limit is 1 Canada goose.
    (4) Tuscola/Huron GMU - The season for Canada geese will close 
after 50 days or when 750 birds have been harvested, whichever occurs 
first. The daily bag limit is 1 Canada goose.
    (5) Remainder of South Zone - The season for Canada geese may 
extend for 30 days. The daily bag limit is 1 Canada goose.
    (d) Southern Michigan GMU - An experimental special Canada goose 
season may be held between January 4 and February 2. The daily bag 
limit is 2 Canada geese.
    Minnesota:
    (a) West Zone
    (1) West Central Zone - The season for Canada geese may extend for 
30 days. In the Lac Qui Parle Zone, the season will close after 30 days 
or when 16,000 birds have been harvested, whichever occurs first. 
Throughout the West Central Zone, the daily bag limit is 1 Canada 
goose.
    (2) Remainder of West Zone - The season for Canada geese may extend 
for 40 days. The daily bag limit is 1 Canada goose.
    (b) Northwest Zone - The season for Canada geese may extend for 40 
days. The daily bag limit is 1 Canada goose.
    (c) Remainder of the State - The season for Canada geese may extend 
for 70 days, except in the Twin Cities Metro Zone and Olmsted County, 
where the season may not exceed 80 days. The daily bag limit is 2 
Canada geese.
    (d) Fergus Falls/Alexandria Zone - A special Canada goose season of 
up to 10 days may be held in December. During the special season, the 
daily bag limit is 2 Canada geese.
    Mississippi: The season for Canada geese may extend for 70 days. 
The daily bag limit is 3 Canada geese.
    Missouri
    (a) Swan Lake Zone - The season for Canada geese will close after 
40 days or when 5,000 birds have been harvested, whichever occurs 
first. The daily bag limit is 2 Canada geese.
    (b) Schell-Osage Zone - The season for Canada geese may extend for 
40 days. The daily bag limit is 2 Canada geese.
    (c) Remainder of the State - The season for Canada geese may extend 
for 70 days in the respective duck-hunting zones. The season may be 
split into 3 segments, provided that one segment of at least 9 days 
occurs prior to October 15. The daily bag limit is 2 Canada geese.
    Ohio: The season may extend for 70 days in the respective duck-
hunting zones, with a daily bag limit of 2 Canada geese, except in the 
Lake Erie SJBP Zone, where the season may not exceed 30 days and the 
daily bag limit is 1 Canada goose. In the Pymatuning Reservoir Area, 
the seasons, limits, and shooting hours for all geese shall be the same 
as those selected in the adjacent portion of Pennsylvania.
    Tennessee
    (a) Northwest Zone - The season for Canada geese will close after 
78 days or when 8,000 birds have been harvested, whichever occurs 
first. The season may extend to February 15. All geese harvested must 
be tagged. The daily bag limit is 2 Canada geese.
    (b) Southwest Zone - The season for Canada geese may extend for 63 
days, and the harvest will be limited to 700 birds. The daily bag limit 
is 2 Canada geese.
    (c) Kentucky/Barkley Lakes Zone - The season for Canada geese will 
close after 50 days or when 1,800 birds have been harvested, whichever 
occurs first. All geese harvested must be tagged. The daily bag limit 
is 2 Canada geese.
    (d) Remainder of the State - The season for Canada geese may extend 
for 70 days. The daily bag limit is 2 Canada geese.
    Wisconsin: The total harvest of Canada geese in the State will be 
limited to 69,600 birds.
    (a) Horicon Zone - The framework opening date for all geese is 
September 21. The harvest of Canada geese is limited to 36,600 birds. 
The season may not exceed 86 days. All Canada geese harvested must be 
tagged. The daily bag limit is 1 Canada goose and the season limit will 
be the number of tags issued to each permittee.
    (b) Collins Zone - The framework opening date for all geese is 
September 21. The harvest of Canada geese is limited to 1,100 birds. 
The season may not exceed 68 days. All Canada geese harvested must be 
tagged. The daily bag limit is 1 Canada goose and the season limit will 
be the number of tags issued to each permittee.
    (c) Exterior Zone - The framework opening date for all geese is 
September 28. The harvest of Canada geese is limited to 27,400 birds, 
with 500 birds allocated to the Mississippi River Subzone. The season 
may not exceed 79 days and the daily bag limit is 1 Canada goose. In 
that portion of the Exterior Zone outside the Mississippi River 
Subzone, the progress of the harvest must be monitored, and the season 
closed, if necessary, to ensure that the harvest does not exceed 26,900 
birds.
    Additional Limits: In addition to the harvest limits stated for the 
respective zones above, an additional 4,500 Canada geese may be taken 
in the Horicon Zone under special agricultural permits.
    Quota Zone Closures: When it has been determined that the quota of 
Canada geese allotted to the Northern Illinois, Central Illinois, 
Southern Illinois, and Rend Lake Quota Zones in Illinois, Posey County 
in Indiana, the Ballard and Henderson-Union Subzones in Kentucky, the 
Allegan County, Muskegon Wastewater, Saginaw County, and Tuscola/Huron 
Goose Management Units in Michigan, the Lac Qui Parle

[[Page 50671]]

Zone in Minnesota, the Swan Lake Zone in Missouri, the Northwest and 
Kentucky/Barkley Lakes Zones in Tennessee, and the Exterior Zone in 
Wisconsin will have been filled, the season for taking Canada geese in 
the respective zone (and associated area, if applicable) will be closed 
by either the Director upon giving public notice through local 
information media at least 48 hours in advance of the time and date of 
closing, or by the State through State regulations with such notice and 
time (not less than 48 hours) as they deem necessary.

Central Flyway

    The Central Flyway includes Colorado (east of the Continental 
Divide), Kansas, Montana (Counties of Blaine, Carbon, Fergus, Judith 
Basin, Stillwater, Sweetgrass, Wheatland, and all counties east 
thereof), Nebraska, New Mexico (east of the Continental Divide except 
the Jicarilla Apache Indian Reservation), North Dakota, Oklahoma, South 
Dakota, Texas, and Wyoming (east of the Continental Divide).

Ducks, Mergansers, and Coots

    Outside Dates: Between September 28 and January 19.
    Hunting Seasons and Duck Limits:
    (1) High Plains Mallard Management Unit (roughly defined as that 
portion of the Central Flyway which lies west of the 100th meridian): 
83 days and a daily bag limit of 5 ducks, including no more than 1 
female mallard, 1 mottled duck, 1 pintail, 1 canvasback, 2 redheads, 
and 2 wood ducks. The last 23 days may start no earlier than the 
Saturday nearest December 10 (December 7).
    (2) Remainder of the Central Flyway: 60 days and a daily bag limit 
of 5 ducks, including no more than 1 female mallard, 1 mottled duck, 1 
pintail, 1 canvasback, 2 redheads, and 2 wood ducks.
    Merganser Limits: The daily bag limit is 5 mergansers, only 1 of 
which may be a hooded merganser.
    Coot Limits: The daily bag limit is 15 coots.
    Zoning and Split Seasons: Kansas (Low Plains portion), Montana, 
Nebraska (Low Plains portion), New Mexico, Oklahoma (Low Plains 
portion), South Dakota (Low Plains portion), Texas (Low Plains 
portion), and Wyoming may select hunting seasons by zones.
    In Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, 
South Dakota, Texas, and Wyoming, the regular season may be split into 
two segments.
    In Colorado, the season may be split into three segments.

Geese

    Season Lengths, Outside Dates, and Limits: States may select 
seasons not to exceed 107 days; except for dark geese, which may not 
exceed 86 days in Kansas, Nebraska, North Dakota, Oklahoma, South 
Dakota, and the Eastern Goose Zone of Texas. For dark geese, outside 
dates for seasons may be selected between the Saturday nearest October 
1 (September 28) and January 31, except in the Western Goose Zone of 
Texas, where the closing date is the Sunday nearest February 15 
(February 16). For light geese, outside dates for seasons may be 
selected between the Saturday nearest October 1 (September 28) and 
March 10, except in the Rainwater Basin Light Goose Area of Nebraska 
where the closing date is the Sunday nearest February 15 (February 16). 
Seasons may be split into two segments. The daily bag and possession 
limits for light geese are 10 and 40, respectively.
    Dark goose daily bag limits in States and goose management zones 
within States, may be as follows:
    Kansas, Nebraska, Oklahoma, and South Dakota: 2 dark geese, 
including no more than 1 white-fronted goose.
    Colorado, Montana, New Mexico and Wyoming: 4 dark geese.
    North Dakota: 2 dark geese.
    Texas: For the Western Goose Zone, the daily bag limit is 5 dark 
geese, including no more than 1 white-fronted and 4 Canada geese.
    For the Eastern Goose Zone, the daily bag limit is 2 dark geese, 
including no more than 1 white-fronted goose.

Pacific Flyway

Ducks, Mergansers, Coots, and Common Moorhens

    Hunting Seasons and Duck Limits: Concurrent 93 days and daily bag 
limit of 7 ducks, including no more than 1 female mallard, 2 pintails, 
2 redheads and 1 canvasback.
    The season on coots and common moorhens may be between the outside 
dates for the season on ducks, but not to exceed 93 days. In the 
Columbia Basin Mallard Management Unit, the seasons may be an 
additional 7 days.
    Coot and Common Moorhen Limits: The daily bag and possession limits 
of coots and common moorhens are 25, singly or in the aggregate.
    Outside Dates: Between the Saturday nearest October 1 (September 
28) and the Sunday nearest January 20 (January 19).
    Zoning and Split Seasons: Arizona, California, Idaho, Nevada, 
Oregon, Utah, and Washington may select hunting seasons by zones.
    Arizona, California, Idaho, Nevada, Oregon, Utah, and Washington 
may split their seasons into two segments.
    Colorado, Montana, New Mexico, and Wyoming may split their seasons 
into three segments.
    Colorado River Zone, California: Seasons and limits shall be the 
same as seasons and limits selected in the adjacent portion of Arizona 
(South Zone).

Geese

    Season Lengths, Outside Dates, and Limits: Except as subsequently 
noted, 100-day seasons may be selected, with outside dates between the 
Saturday nearest October 1 (September 28), and the Sunday nearest 
January 20 (January 19), and the basic daily bag limits are 3 light 
geese and 4 dark geese, except in California, Oregon, and Washington, 
where the dark goose bag limit does not include brant.
    Brant Season - A 16-consecutive-day season may be selected in 
Oregon and Washington, and a 30-consecutive day season may be selected 
in California. In these States, the daily bag limit is 2 brant and is 
in addition to dark goose limits.
    Closures: There will be no open season on Aleutian Canada geese in 
the Pacific Flyway. The States of California, Oregon, and Washington 
must include a statement on the closure for that subspecies in their 
respective regulations leaflet. Emergency closures may be invoked for 
all Canada geese should Aleutian Canada goose distribution patterns or 
other circumstances justify such actions.
    Arizona: The daily bag limit for dark geese is 2 geese.
    California
    Northeastern Zone - White-fronted geese and cackling Canada geese 
may be taken only during the first 23 days of the goose season. The 
daily bag limit is 3 geese and may include no more than 2 dark geese; 
including not more than 1 cackling Canada goose.
    Colorado River Zone - The seasons and limits must be the same as 
those selected in the adjacent portion of Arizona (South Zone).
    Southern Zone - The daily bag and possession limits for dark geese 
is 2 geese, including not more than 1 cackling Canada goose.
    Balance-of-the-State Zone - A 79-day season may be selected, except 
that white-fronted geese and cackling Canada geese may be taken during 
only the first 65 days of such season. Limits may not include more than 
3 geese per day and in possession, of which not more than 1 may be a 
dark goose. The dark goose limits may be expanded to 2,

[[Page 50672]]

provided that they are Canada geese other than cackling Canada geese 
for which the daily limit is 1.
    Three areas in the Balance-of-the-State Zone are restricted in the 
hunting of certain geese:
    (1) In the Counties of Del Norte and Humboldt, there will be no 
open season for Canada geese.
    (2) In the Sacramento Valley Area, the season on white-fronted 
geese must end on or before December 14, and, except in the Western 
Canada Goose Hunt Area, there will be no open season for Canada geese.
    (3) In the San Joaquin Valley Area, the hunting season for Canada 
geese will close no later than November 23.
    Colorado: The daily bag limit for dark geese is 2 geese.
    Idaho
    Northern Unit - The daily bag limit is 4 geese, including 4 dark 
geese, but not more than 3 light geese.
    Southwest Unit and Southeastern Unit - The daily bag limit on dark 
geese is 4.
    Montana
    West of Divide Zone and East of Divide Zone - The daily bag limit 
on dark geese is 4.
    Nevada
    Lincoln and Clark County Zone - The daily bag limit of dark geese 
is 2 geese.
    New Mexico: The daily bag limit for dark geese is 2 geese.
    Oregon: Except as subsequently noted, the dark goose limit is 4, 
including not more than 1 cackling Canada goose.
    Harney, Lake, Klamath, and Malheur Counties Zone - The season 
length may be 100 days. The dark goose limit is 4, including not more 
than 2 white-fronted geese and 1 cackling Canada goose.
    Western Zone - In the Special Canada Goose Management Area, except 
for designated areas, there shall be no open season on Canada geese. In 
the designated areas, individual quotas shall be established which 
collectively shall not exceed 132 dusky Canada geese. See section on 
quota zones. In those designated areas, the daily bag limit of dark 
geese is 3, including not more than 2 cackling Canada geese.
    Utah: The daily bag limit for dark geese is 2 geese.
    Washington: The daily bag limit is 4 geese, including 4 dark geese 
but not more than 3 light geese.
    West Zone - In the Lower Columbia River Special Goose Management 
Area, except for designated areas, there shall be no open season on 
Canada geese. In the designated areas, individual quotas shall be 
established which collectively shall not exceed 72 dusky Canada geese. 
See section on quota zones.
    Wyoming: The daily bag limit is 4 dark geese.
    Quota Zones: Seasons on Canada geese must end upon attainment of 
individual quotas of dusky Canada geese allotted to the designated 
areas of Oregon and Washington. The September Canada goose season, the 
regular goose season, any special late Canada goose season, and any 
extended falconry season, combined, must not exceed 107 days and the 
established quota of dusky Canada geese must not be exceeded. Hunting 
of Canada geese in those designated areas shall only be by hunters 
FR Doc. 96-24733 Migratory Bird Hunting; Final Frameworks for Late-Season Migratory Bird Hunting Regulations
possessing a State-issued permit authorizing them to do so. In a 
Service-approved investigation, the State must obtain quantitative 
information on hunter compliance of those regulations aimed at reducing 
the take of dusky Canada geese and eliminating the take of Aleutian 
Canada geese. The daily bag limit of Canada geese may not include more 
than 2 cackling Canada goose.
    In the designated areas of the Washington Quota Zone, a special 
late Canada goose may be held between February 5 and March 10. The 
daily bag limit may not include Aleutian Canada geese. In the Special 
Canada Goose Management Area of Oregon, the framework closing date is 
extended to February 28th.

Swans

    In designated areas of Utah, Nevada, and the Pacific Flyway portion 
of Montana, an open season for taking a limited number of swans may be 
selected. Permits will be issued by States and will authorize each 
permittee to take no more than 1 swan per season. The season may open 
no earlier than the Saturday nearest October 1 (September 28). The 
States must implement a harvest-monitoring program to measure the 
species composition of the swan harvest. In Utah and Nevada, the 
harvest-monitoring program must require that all harvested swans or 
their species-determinant parts be examined by either State or Federal 
biologists for the purpose of species classification. All States should 
use appropriate measures to maximize hunter compliance in providing 
bagged swans for examination or, in the case of Montana, reporting 
bill-measurement and color information. All States must provide to the 
Service by June 30, 1996, a report covering harvest, hunter 
participation, reporting compliance, and monitoring of swan populations 
in the designated hunt areas. These seasons will be subject to the 
following conditions:
    In Utah, no more than 2,750 permits may be issued. The season must 
end no later than the first Sunday in December (December 1) or upon 
attainment of 15 trumpeter swans in the harvest, whichever occurs 
earliest.
    In Nevada, no more than 650 permits may be issued. The season must 
end no later than the Sunday following January 1 (January 5) or upon 
attainment of 5 trumpeter swans in the harvest, whichever occurs 
earliest.
    In Montana, no more than 500 permits may be issued. The season must 
end no later than December 1.

Tundra Swans

    In Central Flyway portion of Montana, and in North Carolina, North 
Dakota, South Dakota, and Virginia, an open season for taking a limited 
number of tundra swans may be selected. Permits will be issued by the 
States and will authorize each permittee to take no more than 1 tundra 
swan per season. The States must obtain harvest and hunter 
participation data. These seasons will be subject to the following 
conditions:
    In the Atlantic Flyway
    --The season will be experimental.
    --The season may be 90 days, from October 1 to January 31.
    --In North Carolina, no more than 5,000 permits may be issued.
    --In Virginia, no more than 600 permits may be issued.
    In the Central Flyway
    --The season may be 107 days and must occur during the light goose 
season.
    --In the Central Flyway portion of Montana, no more than 500 
permits may be issued.
    --In North Dakota, no more than 2,000 permits may be issued.
    --In South Dakota, no more than 1,500 permits may be issued.

Area, Unit and Zone Descriptions

Ducks (Including Mergansers) and Coots

Atlantic Flyway
    Connecticut
    North Zone: That portion of the State north of I-95.
    South Zone: Remainder of the State.
    Maine
    North Zone: That portion north of the line extending east along 
Maine State Highway 110 from the New Hampshire and Maine border to the 
intersection of Maine State Highway 11 in Newfield; then north and east 
along Route 11 to the intersection of U.S. Route 202 in Auburn; then 
north and east on Route 202 to the intersection of Interstate Highway 
95 in Augusta; then north and east along I-95 to Route 15 in Bangor; 
then east along Route 15 to Route 9; then east along Route 9 to Stony 
Brook in Baileyville; then east along Stony Brook to the United States 
border.

[[Page 50673]]

    South Zone: Remainder of the State.
    Massachusetts
    Western Zone: That portion of the State west of a line extending 
south from the Vermont border on I-91 to MA 9, west on MA 9 to MA 10, 
south on MA 10 to U.S. 202, south on U.S. 202 to the Connecticut 
border.
    Central Zone: That portion of the State east of the Berkshire Zone 
and west of a line extending south from the New Hampshire border on I-
95 to U.S. 1, south on U.S. 1 to I-93, south on I-93 to MA 3, south on 
MA 3 to U.S. 6, west on U.S. 6 to MA 28, west on MA 28 to I-195, west 
to the Rhode Island border; except the waters, and the lands 150 yards 
inland from the high-water mark, of the Assonet River upstream to the 
MA 24 bridge, and the Taunton River upstream to the Center St.-Elm St. 
bridge shall be in the Coastal Zone.
    Coastal Zone: That portion of Massachusetts east and south of the 
Central Zone.
    New Hampshire
    Coastal Zone: That portion of the State east of a line extending 
west from Maine border in Rollinsford on NH 4 to the city of Dover, 
south to NH 108, south along NH 108 through Madbury, Durham, and 
Newmarket to NH 85 in Newfields, south to NH 101 in Exeter, east to NH 
51 (Exeter-Hampton Expressway), east to I-95 (New Hampshire Turnpike) 
in Hampton, and south along I-95 to the Massachusetts border.
    Inland Zone: That portion of the State north and west of the above 
boundary.
    New Jersey
    Coastal Zone: That portion of the State seaward of a line beginning 
at the New York border in Raritan Bay and extending west along the New 
York border to NJ 440 at Perth Amboy; west on NJ 440 to the Garden 
State Parkway; south on the Garden State Parkway to the shoreline at 
Cape May and continuing to the Delaware border in Delaware Bay.
    North Zone: That portion of the State west of the Coastal Zone and 
north of a line extending west from the Garden State Parkway on NJ 70 
to the New Jersey Turnpike, north on the turnpike to U.S. 206, north on 
U.S. 206 to U.S. 1 at Trenton, west on U.S. 1 to the Pennsylvania 
border in the Delaware River.
    South Zone: That portion of the State not within the North Zone or 
the Coastal Zone.
    New York
    Lake Champlain Zone: The U.S. portion of Lake Champlain and that 
area east and north of a line extending along NY 9B from the Canadian 
border to U.S. 9, south along U.S. 9 to NY 22 south of Keesville; south 
along NY 22 to the west shore of South Bay, along and around the 
shoreline of South Bay to NY 22 on the east shore of South Bay; 
southeast along NY 22 to U.S. 4, northeast along U.S. 4 to the Vermont 
border.
    Long Island Zone: That area consisting of Nassau County, Suffolk 
County, that area of Westchester County southeast of I-95, and their 
tidal waters.
    Western Zone: That area west of a line extending from Lake Ontario 
east along the north shore of the Salmon River to I-81, and south along 
I-81 to the Pennsylvania border.
    Northeastern Zone: That area north of a line extending from Lake 
Ontario east along the north shore of the Salmon River to I-81, south 
along I-81 to NY 49, east along NY 49 to NY 365, east along NY 365 to 
NY 28, east along NY 28 to NY 29, east along NY 29 to I-87, north along 
I-87 to U.S. 9 (at Exit 20), north along U.S. 9 to NY 149, east along 
NY 149 to U.S. 4, north along U.S. 4 to the Vermont border, exclusive 
of the Lake Champlain Zone.
    Southeastern Zone: The remaining portion of New York.
    Pennsylvania
    Lake Erie Zone: The Lake Erie waters of Pennsylvania and a 
shoreline margin along Lake Erie from New York on the east to Ohio on 
the west extending 150 yards inland, but including all of Presque Isle 
Peninsula.
    Northwest Zone: The area bounded on the north by the Lake Erie Zone 
and including all of Erie and Crawford Counties and those portions of 
Mercer and Venango Counties north of I-80.
    North Zone: That portion of the State east of the Northwest Zone 
and north of a line extending east on I-80 to U.S. 220, Route 220 to I-
180, I-180 to I-80, and I-80 to the Delaware River.
    South Zone: The remaining portion of Pennsylvania.
    Vermont
    Lake Champlain Zone: The U.S. portion of Lake Champlain and that 
area north and west of the line extending from the New York border 
along U.S. 4 to VT 22A at Fair Haven; VT 22A to U.S. 7 at Vergennes; 
U.S. 7 to the Canadian border.
    Interior Zone: The remaining portion of Vermont.
    West Virginia
    Zone 1 : That portion outside the boundaries in Zone 2.
    Zone 2 (Allegheny Mountain Upland): That area bounded by a line 
extending south along U.S. 220 through Keyser to U.S. 50; U.S. 50 to WV 
93; WV 93 south to WV 42; WV 42 south to Petersburg; WV 28 south to 
Minnehaha Springs; WV 39 west to U.S. 219; U.S. 219 south to I-64; I-64 
west to U.S. 60; U.S. 60 west to U.S. 19; U.S. 19 north to I-79, I-79 
north to U.S. 48; U.S. 48 east to the Maryland border; and along the 
border to the point of beginning.
Mississippi Flyway
    Alabama
    South Zone: Mobile and Baldwin Counties.
    North Zone: The remainder of Alabama.
    Illinois
    North Zone: That portion of the State north of a line extending 
east from the Iowa border along Illinois Highway 92 to Interstate 
Highway 280, east along I-280 to I-80, then east along I-80 to the 
Indiana border.
    Central Zone: That portion of the State between the North and South 
Zone boundaries.
    South Zone: That portion of the State south of a line extending 
east from the Missouri border along the Modoc Ferry route to Modoc 
Ferry Road, east along Modoc Ferry Road to Modoc Road, northeasterly 
along Modoc Road and St. Leo's Road to Illinois Highway 3, north along 
Illinois 3 to Illinois 159, north along Illinois 159 to Illinois 161, 
east along Illinois 161 to Illinois 4, north along Illinois 4 to 
Interstate Highway 70, east along I-70 to the Bond County line, north 
and east along the Bond County line to Fayette County, north and east 
along the Fayette County line to Effingham County, east and south along 
the Effingham County line to I-70, then east along I-70 to the Indiana 
border.
    Indiana
    North Zone: That portion of the State north of a line extending 
east from the Illinois border along State Road 18 to U.S. Highway 31, 
north along U.S. 31 to U.S. 24, east along U.S. 24 to Huntington, then 
southeast along U.S. 224 to the Ohio border.
    Ohio River Zone: That portion of the State south of a line 
extending east from the Illinois border along Interstate Highway 64 to 
New Albany, east along State Road 62 to State 56, east along State 56 
to Vevay, east and north on State 156 along the Ohio River to North 
Landing, north along State 56 to U.S. Highway 50, then northeast along 
U.S. 50 to the Ohio border.
    South Zone: That portion of the State between the North and Ohio 
River Zone boundaries.
    Southern Illinois Quota Zone: Alexander, Jackson, Union, and 
Williamson Counties.
    Rend Lake Quota Zone: Franklin and Jefferson Counties.
    Iowa
    North Zone: That portion of the State north of a line extending 
east from the Nebraska border along State Highway

[[Page 50674]]

175 to State 37, southeast along State 37 to U.S. Highway 59, south 
along U.S. 59 to Interstate Highway 80, then east along I-80 to the 
Illinois border.
    South Zone: The remainder of Iowa.
    Kentucky
    West Zone: All counties west of and including Butler, Daviess, 
Ohio, Simpson, and Warren Counties.
    East Zone: The remainder of Kentucky.
    Louisiana
    West Zone: That portion of the State west of a line extending south 
from the Arkansas border along Louisiana Highway 3 to Bossier City, 
east along Interstate Highway 20 to Minden, south along Louisiana 7 to 
Ringgold, east along Louisiana 4 to Jonesboro, south along U.S. Highway 
167 to Lafayette, southeast along U.S. 90 to Houma, then south along 
the Houma Navigation Channel to the Gulf of Mexico through Cat Island 
Pass.
    East Zone: The remainder of Louisiana.
    Catahoula Lake Area: All of Catahoula Lake, including those 
portions known locally as Round Prairie, Catfish Prairie, and Frazier's 
Arm. See State regulations for additional information.
    Michigan
    North Zone: The Upper Peninsula.
    Middle Zone: That portion of the Lower Peninsula north of a line 
beginning at the Wisconsin border in Lake Michigan due west of the 
mouth of Stony Creek in Oceana County; then due east to, and easterly 
and southerly along the south shore of, Stony Creek to Webster Road, 
easterly and southerly along Webster Road to Stony Lake Road, easterly 
along Stony Lake and Garfield Roads to Michigan Highway 20, east along 
Michigan 20 to U.S. Highway 10 Business Route (BR) in the city of 
Midland, east along U.S. 10 BR to U.S. 10, east along U.S. 10 to 
Interstate Highway 75/U.S. Highway 23, north along I-75/U.S. 23 to the 
U.S. 23 exit at Standish, east along U.S. 23 to Shore Road in Arenac 
County, east along Shore Road to the tip of Point Lookout, then on a 
line directly east 10 miles into Saginaw Bay, and from that point on a 
line directly northeast to the Canada border.
    South Zone: The remainder of Michigan.
    Mississippi
    Zone 1: Hancock, Harrison, and Jackson Counties.
    Zone 2: The remainder of Mississippi.
    Missouri
    North Zone: That portion of Missouri north of a line running west 
from the Illinois border along Interstate Highway 70 to U.S. Highway 
54, south along U.S. 54 to U.S. 50, then west along U.S. 50 to the 
Kansas border.
    South Zone: That portion of Missouri south of a line running west 
from the Illinois border along Missouri Highway 34 to Interstate 
Highway 55; south along I-55 to U.S. Highway 62, west along U.S. 62 to 
Missouri 53, north along Missouri 53 to Missouri 51, north along 
Missouri 51 to U.S. 60, west along U.S. 60 to Missouri 21, north along 
Missouri 21 to Missouri 72, west along Missouri 72 to Missouri 32, west 
along Missouri 32 to U.S. 65, north along U.S. 65 to U.S. 54, west 
along U.S. 54 to Missouri 32, south along Missouri 32 to Missouri 97, 
south along Missouri 97 to Dade County NN, west along Dade County NN to 
Missouri 37, west along Missouri 37 to Jasper County N, west along 
Jasper County N to Jasper County M, west along Jasper County M to the 
Kansas border.
    Middle Zone: The remainder of Missouri.
    Ohio
    North Zone: The Counties of Darke, Miami, Clark, Champaign, Union, 
Delaware, Licking (excluding the Buckeye Lake Area), Muskingum, 
Guernsey, Harrison and Jefferson and all counties north thereof.
    Pymatuning Area: Pymatuning Reservoir and that part of Ohio bounded 
on the north by County Road 306 (known as Woodward Road), on the west 
by Pymatuning Lake Road, and on the south by U.S. Highway 322.
    Ohio River Zone: The Counties of Hamilton, Clermont, Brown, Adams, 
Scioto, Lawrence, Gallia and Meigs.
    South Zone: That portion of the State between the North and Ohio 
River Zone boundaries, including the Buckeye Lake Area in Licking 
County bounded on the west by State Highway 37, on the north by U.S. 
Highway 40, and on the east by State 13.
    Tennessee
    Reelfoot Zone: All or portions of Lake and Obion Counties.
    State Zone: The remainder of Tennessee.
    Wisconsin
    North Zone: That portion of the State north of a line extending 
east from the Minnesota border along State Highway 77 to State 27, 
south along State 27 and 77 to U.S. Highway 63, and continuing south 
along State 27 to Sawyer County Road B, south and east along County B 
to State 70, southwest along State 70 to State 27, south along State 27 
to State 64, west along State 64/27 and south along State 27 to U.S. 
12, south and east on State 27/U.S. 12 to U.S. 10, east on U.S. 10 to 
State 310, east along State 310 to State 42, north along State 42 to 
State 147, north along State 147 to State 163, north along State 163 to 
Kewaunee County Trunk A, north along County Trunk A to State 57, north 
along State 57 to the Kewaunee/Door County Line, west along the 
Kewaunee/Door County Line to the Door/Brown County Line, west along the 
Door/Brown County Line to the Door/Oconto/Brown County Line, northeast 
along the Door/Oconto County Line to the Marinette/Door County Line, 
northeast along the Marinette/Door County Line to the Michigan border.
    South Zone: The remainder of Wisconsin.
Central Flyway
    Kansas
    High Plains Zone: That portion of the State west of U.S. 283.
    Low Plains Early Zone: That portion of the State east of the High 
Plains Zone and west of a line extending south from the Nebraska border 
along KS 28 to U.S. 36, east along U.S. 36 to KS 199, south along KS 
199 to Republic County Road 563, south along Republic County Road 563 
to KS 148, east along KS 148 to Republic County Road 138, south along 
Republic County Road 138 to Cloud County Road 765, south along Cloud 
County Road 765 to KS 9, west along KS 9 to U.S. 24, west along U.S 24 
to U.S. 281, north along U.S. 281 to U.S. 36, west along U.S. 36 to 
U.S. 183, south along U.S. 183 to U.S. 24, west along U.S. 24 to KS 18, 
southeast along KS 18 to U.S, 183, south along U.S. 183 to KS 4, east 
along KS 4 to I-135, south along I-135 to KS 61, southwest along KS 61 
to KS 96, northwest on KS 96 to U.S. 56, west along U.S. 56 to U.S. 
281, south along U.S. 281 to U.S. 54, then west along U.S. 54 to U.S. 
283.
    Low Plains Late Zone: The remainder of Kansas.
    Montana (Central Flyway Portion)
    Zone 1: The Counties of Blaine, Carbon, Carter, Daniels, Dawson, 
Fallon, Fergus, Garfield, Golden Valley, Judith Basin, McCone, 
Musselshell, Petroleum, Phillips, Powder River, Richland, Roosevelt, 
Sheridan, Stillwater, Sweet Grass, Valley, Wheatland, Wibaux, and 
Yellowstone.
    Zone 2: The remainder of Montana.
    Nebraska
    High Plains Zone: That portion of the State west of Highways U.S. 
183 and U.S. 20 from the South Dakota border to Ainsworth, NE 7 and NE 
91 to Dunning, NE 2 to Merna, NE 93 to Arnold, NE 40 and NE 47 through 
Gothenburg to NE 23, NE 23 to Elwood, and U.S. 283 to the Kansas 
border.
    Low Plains Zone 1: That portion of the State east of the High 
Plains Zone and north and east of a line extending from the South 
Dakota border along NE 26E Spur to U.S. 20, west on U.S. 20 to NE 12, 
west on NE 12 to the Knox/Keya Paha County line, south along the county 
line to the Niobrara River and

[[Page 50675]]

along the Niobrara River to U.S. 183 (the High Plains Zone line). Where 
the Niobrara River forms the boundary, both banks will be in Zone 1.
    Low Plains Zone 2: That portion of the State east of the High 
Plains Zone and bounded by designated highways and political boundaries 
starting on U.S. 73 at the Kansas border, north to NE 67, north to U.S. 
75, north to NE 2, west to NE 43, north to U.S. 34, east to NE 63; 
north and west to U.S. 77; north to NE 92; west to U.S. 81; south to NE 
66; west to NE 14; south to U.S. 34; west to NE 2; south to I-80; west 
to Hamilton/Hall County line (Gunbarrel Road), south to Giltner Road; 
west to U.S. 34; west to U.S. 136; east on U.S. 135 to NE 10; south to 
the State line; west to U.S. 283; north to NE 23; west to NE 47; north 
to U.S. 30; east to NE 14; north to NE 52; northeasterly to NE 91; west 
to U.S. 281, north to NE 91 in Wheeler County, west to U.S. 183; north 
to northerly boundary of Loup County; east along the north boundaries 
of Loup, Garfield, and Wheeler County; south along the east Wheeler 
County line to NE 70; east on NE 70 from Wheeler County to NE 14; south 
to NE 39; southeast to NE 22; east to U.S. 81; southeast to U.S. 30; 
east along U.S. 30 to U.S. 75, north along U.S. 75 to the Washington/
Burt County line; then east along the county line to the Iowa border.
    Low Plains Zone 3: The area east of the High Plains Zone, excluding 
Low Plains Zone 1, north of Low Plains Zone 2.
    Low Plains Zone 4: The area east of the High Plains Zone and south 
of Zone 2.
    New Mexico (Central Flyway Portion)
    North Zone: That portion of the State north of I-40 and U.S. 54.
    South Zone: The remainder of New Mexico.
    North Dakota
    High Plains Unit: That portion of the State west of a line from the 
South Dakota border along U.S. 83 and I-94 to ND 41, north to ND 53, 
west to U.S. 83, north to ND 23, west to ND 8, north to U.S. 2, west to 
U.S. 85, north to the Canadian border.
    Low Plains: The remainder of North Dakota.
    Oklahoma
    High Plains Zone: The Counties of Beaver, Cimarron, and Texas.
    Low Plains Zone 1: That portion of the State east of the High 
Plains Zone and north of a line extending east from the Texas border 
along OK 33 to OK 47, east along OK 47 to U.S. 183, south along U.S. 
183 to I-40, east along I-40 to U.S. 177, north along U.S. 177 to OK 
33, west along OK 33 to I-35, north along I-35 to U.S. 60, west along 
U.S. 60 to U.S. 64, west along U.S. 64 to OK 132, then north along OK 
132 to the Kansas border.
    Low Plains Zone 2: The remainder of Oklahoma.
    South Dakota
    High Plains Unit: That portion of the State west of a line 
beginning at the North Dakota border and extending south along U.S. 83 
to U.S. 14, east along U.S. 14 to Blunt-Canning Road in Blunt, south 
along Blunt-Canning Road to SD 34, south across a line over the 
Missouri River to the northwestern corner of the Lower Brule Indian 
Reservation, south along the Reservation Boundary to Lyman County Road, 
south along Lyman County Road to I-90 at Presho, east on I-90 to U.S. 
183, then south along U.S. 183 to Nebraska border.
    North Zone: That portion of northeastern South Dakota east of the 
High Plains Unit and north of a line extending east along US 212 to SD 
15, then north along SD 15 to Big Stone Lake at the Minnesota border.
    South Zone: That portion of Gregory County east of SD 47, Charles 
Mix County south of SD 44 to the Douglas County line, south on SD 50 to 
Geddes, east on the Geddes Hwy. to U.S. 281, south on U.S. 281 and U.S. 
18 to SD 50, south and east on SD 50 to Bon Homme County line, the 
Counties of Bon Homme, Yankton, and Clay south of SD 50, and Union 
County south and west of SD 50 and I-29.
    Middle Zone: The remainder of South Dakota.
    Texas
    High Plains Zone: That portion of the State west of a line 
extending south from the Oklahoma border along U.S. 183 to Vernon, 
south along U.S. 283 to Albany, south along TX 6 to TX 351 to Abilene, 
south along U.S. 277 to Del Rio, then south along the Del Rio 
International Toll Bridge access road to the Mexico border.
    Wyoming (Central Flyway portion)
    Zone 1: The Counties of Converse, Goshen, Hot Springs, Natrona, 
Platte, Washakie, and that portion of Park County south of T58N and not 
within the boundary of the Shoshone National Forest.
    Zone 2: The remainder of Wyoming.
Pacific Flyway
    Arizona--Game Management Units (GMU) as follows:
    South Zone: Those portions of GMUs 6 and 8 in Yavapai County, and 
GMUs 10 and 12B-45.
    North Zone: GMUs 1-5, those portions of GMUs 6 and 8 within 
Coconino County, and GMUs 7, 9, 12A.
    California
    Northeastern Zone: That portion of the State east and north of a 
line beginning at the Oregon border; south and west along the Klamath 
River to the mouth of Shovel Creek; south along Shovel Creek to Forest 
Service Road 46N10; south and east along FS 46N10 to FS 45N22; west and 
south along FS 45N22 to U.S. 97 at Grass Lake Summit; south and west 
along U.S. 97 to I-5 at the town of Weed; south along I-5 to CA 89; 
east and south along CA 89 to the junction with CA 49; east and north 
on CA 49 to CA 70; east on CA 70 to U.S. 395; south and east on U.S. 
395 to the Nevada border.
    Colorado River Zone: Those portions of San Bernardino, Riverside, 
and Imperial Counties east of a line extending from the Nevada border 
south along U.S. 95 to Vidal Junction; south on a road known as 
``Aqueduct Road'' in San Bernardino County through the town of Rice to 
the San Bernardino-Riverside County line; south on a road known in 
Riverside County as the ``Desert Center to Rice Road'' to the town of 
Desert Center; east 31 miles on I-10 to the Wiley Well Road; south on 
this road to Wiley Well; southeast along the Army-Milpitas Road to the 
Blythe, Brawley, Davis Lake intersections; south on the Blythe-Brawley 
paved road to the Ogilby and Tumco Mine Road; south on this road to 
U.S. 80; east seven miles on U.S. 80 to the Andrade-Algodones Road; 
south on this paved road to the Mexican border at Algodones, Mexico.
    Southern Zone: That portion of southern California (but excluding 
the Colorado River Zone) south and east of a line extending from the 
Pacific Ocean east along the Santa Maria River to CA 166 near the City 
of Santa Maria; east on CA 166 to CA 99; south on CA 99 to the crest of 
the Tehachapi Mountains at Tejon Pass; east and north along the crest 
of the Tehachapi Mountains to CA 178 at Walker Pass; east on CA 178 to 
U.S. 395 at the town of Inyokern; south on U.S. 395 to CA 58; east on 
CA 58 to I-15; east on I-15 to CA 127; north on CA 127 to the Nevada 
border.
    Southern San Joaquin Valley Temporary Zone: All of Kings and Tulare 
Counties and that portion of Kern County north of the Southern Zone.
    Balance-of-the-State Zone: The remainder of California not included 
in the Northeastern, Southern, and Colorado River Zones, and the 
Southern San Joaquin Valley Temporary Zone.
    Idaho
    Zone 1: Includes all lands and waters within the Fort Hall Indian 
Reservation, including private inholdings; Bannock County; Bingham 
County, except that portion within the Blackfoot Reservoir

[[Page 50676]]

drainage; and Power County east of ID 37 and ID 39.
    Zone 2: Includes the following Counties or portions of Counties: 
Adams; Bear Lake; Benewah; Bingham within the Blackfoot Reservoir 
drainage; those portions of Blaine west of ID 75, south and east of 
U.S. 93, and between ID 75 and U.S. 93 north of U.S. 20 outside the 
Silver Creek drainage; Bonner; Bonneville; Boundary; Butte; Camas; 
Caribou except the Fort Hall Indian Reservation; Cassia within the 
Minidoka National Wildlife Refuge; Clark; Clearwater; Custer; Elmore 
within the Camas Creek drainage; Franklin; Fremont; Idaho; Jefferson; 
Kootenai; Latah; Lemhi; Lewis; Madison; Nez Perce; Oneida; Power within 
the Minidoka National Wildlife Refuge; Shoshone; Teton; and Valley 
Counties.
    Zone 3: Includes the following Counties or portions of Counties: 
Ada; Blaine between ID 75 and U.S. 93 south of U.S. 20 and that 
additional area between ID 75 and U.S. 93 north of U.S. 20 within the 
Silver Creek drainage; Boise; Canyon; Cassia except within the Minidoka 
National Wildlife Refuge; Elmore except the Camas Creek drainage; Gem; 
Gooding; Jerome; Lincoln; Minidoka; Owyhee; Payette; Power west of ID 
37 and ID 39 except that portion within the Minidoka National Wildlife 
Refuge; Twin Falls; and Washington Counties.
    Nevada
    Lincoln and Clark County Zone: All of Clark and Lincoln Counties.
    Remainder-of-the-State Zone: The remainder of Nevada.
    Oregon
    Zone 1: Clatsop, Tillamook, Lincoln, Lane, Douglas, Coos, Curry, 
Josephine, Jackson, Linn, Benton, Polk, Marion, Yamhill, Washington, 
Columbia, Multnomah, Clackamas, Hood River, Wasco, Sherman, Gilliam, 
Morrow and Umatilla Counties.
    Columbia Basin Mallard Management Unit: Gilliam, Morrow, and 
Umatilla Counties.
    Zone 2: The remainder of the State.
    Utah
    Zone 1: All of Box Elder, Cache, Daggett, Davis, Duchesne, Morgan, 
Rich, Salt Lake, Summit, Unitah, Utah, Wasatch, and Weber Counties and 
that part of Toole County north of I-80.
    Zone 2: The remainder of Utah.
    Washington
    East Zone: All areas east of the Pacific Crest Trail and east of 
the Big White Salmon River in Klickitat County.
    Columbia Basin Mallard Management Unit: Same as East Zone.
    West Zone: All areas to the west of the East Zone.

Geese

Atlantic Flyway
    Connecticut
    Same zones as for ducks.
    Georgia
    Special Area for Canada Geese: Statewide.
    Maryland
    Special Area for Canada Geese: Allegheny, Carroll, Frederick, 
Garrett, Washington counties and the portion of Montgomery County south 
of Interstate 270 and west of Interstate 495 to the Potomac River.
    Massachusetts
    Special Area for Canada Geese: Central Zone (same as for ducks) and 
that portion of the Coastal Zone that lies north of route 139 from 
Green Harbor.
    New Hampshire
    Same zones as for ducks.
    New Jersey
    Special Area for Canada Geese
    North - that portion of the State within a continuous line that 
runs east along the New York State boundary line to the Hudson River; 
then south along the New York State boundary to its intersection with 
Route 440 at Perth Amboy; then west on Route 440 to its intersection 
with Route 287; then west along Route 287 to its intersection with 
Route 206 in Bedminster (Exit 18); then north along Route 206 to its 
intersection with Route 94: then west along Route 94 to the tollbridge 
in Columbia; then north along the Pennsylvania State boundary in the 
Delaware River to the beginning point.
    South - that portion of the State within a continuous line that 
runs west from the Atlantic Ocean at Ship Bottom along Route 72 to the 
Garden State Parkway; then south along the Garden State Parkway to 
Route 9; then south along Route 9 to Route 542; then west along Route 
542 to the Mullica River (at Pleasant Mills); then north (upstream) 
along the Mullica River to Route 206; then south along Route 206 to 
Route 536; then west along Route 536 to Route 322; then west along 
Route 322 to Route 55; then south along Route 55 to Route 553 (Buck 
Road); then south along Route 553 to Route 40; then east along Route 40 
to route 55; then south along Route 55 to Route 552 (Sherman Avenue); 
then west along Route 552 to Carmel Road; then south along Carmel Road 
to Route 49; then south along Route 49 to Route 50; then east along 
Route 50 to Route 9; then south along Route 9 to Route 625 (Sea Isle 
City Boulevard); then east along Route 625 to the Atlantic Ocean; then 
north to the beginning point.
    New York
    Special Area for Canada Geese: Westchester County and portions of 
Nassau, Orange, Putnam, Rockland, and Suffolk Counties--See State 
regulations for detailed description.
    Pennsylvania
    Erie, Mercer, and Butler Counties: All of Erie, Mercer, and Butler 
Counties.
    Special Area for Canada Geese: Statewide except for the Counties of 
Erie, Mercer, Butler, Crawford, and the area east of Interstate 83 from 
the Maryland State line to the intersection of U.S. Route 30 to the 
intersection of state Route 441, east of SR 441 to intersection of 
Interstate 283, east of I-283 to I-83, east of I-83 to intersection of 
I-81, east of I-81 to intersection of I-80, and south of I-80 to the 
New Jersey State line.
    Rhode Island
    Special Area for Canada Geese: Kent and Providence Counties and 
portions of the towns of Exeter and North Kingston within Washington 
County (see State regulations for detailed descriptions).
    South Carolina
    Canada Goose Area: Statewide except for Clarendon County and that 
portion of Lake Marion in Orangeburg County and Berkeley County.
    Virginia
    Back Bay Area--Defined for white geese as the waters of Back Bay 
and its tributaries and the marshes adjacent thereto, and on the land 
and marshes between Back Bay and the Atlantic Ocean from Sandbridge to 
the North Carolina line, and on and along the shore of North Landing 
River and the marshes adjacent thereto, and on and along the shores of 
Binson Inlet Lake (formerly known as Lake Tecumseh) and Red Wing Lake 
and the marshes adjacent thereto.
    West Virginia
    Same zones as for ducks.
Mississippi Flyway
    Alabama
    Same zones as for ducks, but in addition:
    SJBP Zone: That portion of Morgan County east of U.S. Highway 31, 
north of State Highway 36, and west of U.S. 231; that portion of 
Limestone County south of U.S. 72; and that portion of Madison County 
south of Swancott Road and west of Triana Road.
    Arkansas
    East Zone: Arkansas, Ashley, Chicot, Clay, Craighead, Crittenden, 
Cross, Desha, Drew, Greene, Independence, Jackson, Jefferson, Lawrence, 
Lee, Lincoln, Lonoke, Mississippi, Monroe, Phillips, Poinsett, Prairie, 
Pulaski, Randolph, St. Francis, White, and Woodruff Counties.
    West Zone: Baxter, Benton, Boone, Carroll, Cleburne, Conway, 
Crawford,

[[Page 50677]]

Faulkner, Franklin, Fulton, Izard, Johnson, Madison, Marion, Newton, 
Pope, Searcy, Sharp, Stone, Van Buren, and Washington Counties, and 
those portions of Logan, Perry, Sebastian, and Yell Counties lying 
north of a line extending east from the Oklahoma border along State 
Highway 10 to Perry, south on State 9 to State 60, then east on State 
60 to the Faulkner County line.
    Illinois
    Same zones as for ducks, but in addition:
    North Zone:
    Northern Illinois Quota Zone: The Counties of McHenry, Lake, Kane, 
DuPage, and those portions of LaSalle and Will Counties north of 
Interstate Highway 80.
    Central Zone:
    Central Illinois Quota Zone: The Counties of Grundy, Woodford, 
Peoria, Knox, Fulton, Tazewell, Mason, Cass, Morgan, Pike, Calhoun, and 
Jersey, and those portions of LaSalle and Will Counties south of 
Interstate Highway 80.
    South Zone:
    Southern Illinois Quota Zone: Alexander, Jackson, Union, and 
Williamson Counties.
    Rend Lake Quota Zone: Franklin and Jefferson Counties.
    Indiana
    Same zones as for ducks, but in addition:
    SJBP Zone: Jasper, LaGrange, Lake, LaPorte, Newton, Porter, 
Pulaski, Starke, and Steuben Counties.
    Iowa
    Same zones as for ducks.
    Kentucky
    Western Zone: That portion of the State west of a line beginning at 
the Tennessee border at Fulton and extending north along the Purchase 
Parkway to Interstate Highway 24, east along I-24 to U.S. Highway 641, 
north along U.S. 641 to U.S. 60, northeast along U.S. 60 to the 
Henderson County line, then south, east, and northerly along the 
Henderson County line to the Indiana border.
    Ballard Reporting Area: That area encompassed by a line beginning 
at the northwest city limits of Wickliffe in Ballard County and 
extending westward to the middle of the Mississippi River, north along 
the Mississippi River and along the low-water mark of the Ohio River on 
the Illinois shore to the Ballard-McCracken County line, south along 
the county line to Kentucky Highway 358, south along Kentucky 358 to 
U.S. Highway 60 at LaCenter; then southwest along U.S. 60 to the 
northeast city limits of Wickliffe.
    Henderson-Union Reporting Area: Henderson County and that portion 
of Union County within the Western Zone.
    Pennyroyal/Coalfield Zone: Butler, Daviess, Ohio, Simpson, and 
Warren Counties and all counties lying west to the boundary of the 
Western Goose Zone.
    Michigan
    Same zones as for ducks, but in addition:
    South Zone
    Tuscola/Huron Goose Management Unit (GMU): Those portions of 
Tuscola and Huron Counties bounded on the south by Michigan Highway 138 
and Bay City Road, on the east by Colwood and Bay Port Roads, on the 
north by Kilmanagh Road and a line extending directly west off the end 
of Kilmanagh Road into Saginaw Bay to the west boundary, and on the 
west by the Tuscola-Bay County line and a line extending directly north 
off the end of the Tuscola-Bay County line into Saginaw Bay to the 
north boundary.
    Allegan County GMU: That area encompassed by a line beginning at 
the junction of 136th Avenue and Interstate Highway 196 in Lake Town 
Township and extending easterly along 136th Avenue to Michigan Highway 
40, southerly along Michigan 40 through the city of Allegan to 108th 
Avenue in Trowbridge Township, westerly along 108th Avenue to 46th 
Street, northerly 1/2 mile along 46th Street to 109th Avenue, westerly 
along 109th Avenue to I-196 in Casco Township, then northerly along I-
196 to the point of beginning.
    Saginaw County GMU: That portion of Saginaw County bounded by 
Michigan Highway 46 on the north; Michigan 52 on the west; Michigan 57 
on the south; and Michigan 13 on the east.
    Muskegon Wastewater GMU: That portion of Muskegon County within the 
boundaries of the Muskegon County wastewater system, east of the 
Muskegon State Game Area, in sections 5, 6, 7, 8, 17, 18, 19, 20, 29, 
30, and 32, T10N R14W, and sections 1, 2, 10, 11, 12, 13, 14, 24, and 
25, T10N R15W, as posted.
    Special Canada Goose Seasons:
    Southern Michigan GMU: That portion of the State, including the 
Great Lakes and interconnecting waterways and excluding the Allegan 
County GMU, south of a line beginning at the Ontario border at the 
Bluewater Bridge in the city of Port Huron and extending westerly and 
southerly along Interstate Highway 94 to I-69, westerly along I-69 to 
Michigan Highway 21, westerly along Michigan 21 to I-96, northerly 
along I-96 to I-196, westerly along I-196 to Lake Michigan Drive (M-45) 
in Grand Rapids, westerly along Lake Michigan Drive to the Lake 
Michigan shore, then directly west from the end of Lake Michigan Drive 
to the Wisconsin border.
    Minnesota
    West Zone: That portion of the state encompassed by a line 
beginning at the junction of State Trunk Highway (STH) 60 and the Iowa 
border, then north and east along STH 60 to U.S. Highway 71, north 
along U.S. 71 to Interstate Highway 94, then north and west along I-94 
to the North Dakota border.
    West Central Zone: That area encompassed by a line beginning at the 
intersection of State Trunk Highway (STH) 29 and U.S. Highway 212 and 
extending west along U.S. 212 to U.S. 59, south along U.S. 59 to STH 
67, west along STH 67 to U.S. 75, north along U.S. 75 to County State 
Aid Highway (CSAH) 30 in Lac qui Parle County, west along CSAH 30 to 
County Road 70 in Lac qui Parle County, west along County 70 to the 
western boundary of the State, north along the western boundary of the 
State to a point due south of the intersection of STH 7 and CSAH 7 in 
Big Stone County, and continuing due north to said intersection, then 
north along CSAH 7 to CSAH 6 in Big Stone County, east along CSAH 6 to 
CSAH 21 in Big Stone County, south along CSAH 21 to CSAH 10 in Big 
Stone County, east along CSAH 10 to CSAH 22 in Swift County, east along 
CSAH 22 to CSAH 5 in Swift County, south along CSAH 5 to U.S. 12, east 
along U.S. 12 to CSAH 17 in Swift County, south along CSAH 17 to CSAH 9 
in Chippewa County, south along CSAH 9 to STH 40, east along STH 40 to 
STH 29, then south along STH 29 to the point of beginning.
    Lac qui Parle Zone: That area encompassed by a line beginning at 
the intersection of U.S. Highway 212 and County State Aid Highway 
(CSAH) 27 in Lac qui Parle County and extending north along CSAH 27 to 
CSAH 20 in Lac qui Parle County, west along CSAH 20 to State Trunk 
Highway (STH) 40, north along STH 40 to STH 119, north along STH 119 to 
CSAH 34 in Lac qui Parle County, west along CSAH 34 to CSAH 19 in Lac 
qui Parle County, north and west along CSAH 19 to CSAH 38 in Lac qui 
Parle County, west along CSAH 38 to U.S. 75, north along U.S. 75 to STH 
7, east along STH 7 to CSAH 6 in Swift County, east along CSAH 6 to 
County Road 65 in Swift County, south along County 65 to County 34 in 
Chippewa County, south along County 34 to CSAH 12 in Chippewa County, 
east along CSAH 12 to CSAH 9 in Chippewa County, south along CSAH 9 to 
STH 7, southeast along STH 7 to Montevideo and along the municipal 
boundary of Montevideo to U.S. 212; then west along U.S. 212 to the 
point of beginning.

[[Page 50678]]

    Northwest Zone: That portion of the state encompassed by a line 
extending east from the North Dakota border along U.S. Highway 2 to 
State Trunk Highway (STH) 32, north along STH 32 to STH 92, east along 
STH 92 to County State Aid Highway (CSAH) 2 in Polk County, north along 
CSAH 2 to CSAH 27 in Pennington County, north along CSAH 27 to STH 1, 
east along STH 1 to CSAH 28 in Pennington County, north along CSAH 28 
to CSAH 54 in Marshall County, north along CSAH 54 to CSAH 9 in Roseau 
County, north along CSAH 9 to STH 11, west along STH 11 to STH 310, and 
north along STH 310 to the Manitoba border.
    Special Canada Goose Seasons:
    Fergus Falls/Alexandria Zone: That area encompassed by a line 
beginning at the intersection of State Trunk Highway (STH) 55 and STH 
28 and extending east along STH 28 to County State Aid Highway (CSAH) 
33 in Pope County, north along CSAH 33 to CSAH 3 in Douglas County, 
north along CSAH 3 to CSAH 69 in Otter Tail County, north along CSAH 69 
to CSAH 46 in Otter Tail County, east along CSAH 46 to the eastern 
boundary of Otter Tail County, north along the east boundary of Otter 
Tail County to CSAH 40 in Otter Tail County, west along CSAH 40 to CSAH 
75 in Otter Tail County, north along CSAH 75 to STH 210, west along STH 
210 to STH 108, north along STH 108 to CSAH 1 in Otter Tail County, 
west along CSAH 1 to CSAH 14 in Otter Tail County, north along CSAH 14 
to CSAH 44 in Otter Tail County, west along CSAH 44 to CSAH 35 in Otter 
Tail County, north along CSAH 35 to STH 108, west along STH 108 to CSAH 
19 in Wilkin County, south along CSAH 19 to STH 55, then southeast 
along STH 55 to the point of beginning.
    Missouri
    Same zones as for ducks but in addition:
    North Zone
    Swan Lake Zone: That area bounded by U.S. Highway 36 on the north, 
Missouri Highway 5 on the east, Missouri 240 and U.S. 65 on the south, 
and U.S. 65 on the west.
    Middle Zone
    Schell-Osage Zone: That portion of the State encompassed by a line 
extending east from the Kansas border along U.S. Highway 54 to Missouri 
Highway 13, north along Missouri 13 to Missouri 7, west along Missouri 
7 to U.S. 71, north along U.S. 71 to Missouri 2, then west along 
Missouri 2 to the Kansas border.
    Ohio
    Same zones as for ducks but in addition:
    North Zone
    Pymatuning Area: Pymatuning Reservoir and that part of Ohio bounded 
on the north by County Road 306 (known as Woodward Road), on the west 
by Pymatuning Lake Road, and on the south by U.S. Highway 322.
    Lake Erie SJBP Zone: That portion of the State encompassed by a 
line extending south from the Michigan border along Interstate Highway 
75 to I-280, south along I-280 to I-80, and east along I-80 to the 
Pennsylvania border.
    Tennessee
    Southwest Zone: That portion of the State south of State Highways 
20 and 104, and west of U.S. Highways 45 and 45W.
    Northwest Zone: Lake, Obion and Weakley Counties and those portions 
of Gibson and Dyer Counties not included in the Southwest Tennessee 
Zone.
    Kentucky/Barkley Lakes Zone: That portion of the State bounded on 
the west by the eastern boundaries of the Northwest and Southwest Zones 
and on the east by State Highway 13 from the Alabama border to 
Clarksville and U.S. Highway 79 from Clarksville to the Kentucky 
border.
    Wisconsin
    Horicon Zone: That area encompassed by a line beginning at the 
intersection of State Highway 21 and the Fox River in Winnebago County 
and extending westerly along State 21 to the west boundary of Winnebago 
County, southerly along the west boundary of Winnebago County to the 
north boundary of Green Lake County, westerly along the north 
boundaries of Green Lake and Marquette Counties to State 22, southerly 
along State 22 to State 33, westerly along State 33 to U.S. Highway 16, 
westerly along U.S. 16 to Weyh Road, southerly along Weyh Road to 
County Highway O, southerly along County O to the west boundary of 
Section 31, southerly along the west boundary of Section 31 to the 
Sauk/Columbia County boundary, southerly along the Sauk/Columbia County 
boundary to State 33, easterly along State 33 to Interstate Highway 90/
94, southerly along I-90/94 to State 60, easterly along State 60 to 
State 83, northerly along State 83 to State 175, northerly along State 
175 to State 33, easterly along State 33 to U.S. Highway 45, northerly 
along U.S. 45 to the east shore of the Fond Du Lac River, northerly 
along the east shore of the Fond Du Lac River to Lake Winnebago, 
northerly along the western shoreline of Lake Winnebago to the Fox 
River, then westerly along the Fox River to State 21.
    Collins Zone: That area encompassed by a line beginning at the 
intersection of Hilltop Road and Collins Marsh Road in Manitowoc County 
and extending westerly along Hilltop Road to Humpty Dumpty Road, 
southerly along Humpty Dumpty Road to Poplar Grove Road, easterly and 
southerly along Poplar Grove Road to County Highway JJ, southeasterly 
along County JJ to Collins Road, southerly along Collins Road to the 
Manitowoc River, southeasterly along the Manitowoc River to Quarry 
Road, northerly along Quarry Road to Einberger Road, northerly along 
Einberger Road to Moschel Road, westerly along Moschel Road to Collins 
Marsh Road, northerly along Collins Marsh Road to Hilltop Road.
    Exterior Zone: That portion of the State not included in the 
Horicon or Collins Zones.
    Mississippi River Subzone: That area encompassed by a line 
beginning at the intersection of the Burlington Northern Railway and 
the Illinois border in Grant County and extending northerly along the 
Burlington Northern Railway to the city limit of Prescott in Pierce 
County, then west along the Prescott city limit to the Minnesota 
border.
    Rock Prairie Subzone: That area encompassed by a line beginning at 
the intersection of the Illinois border and Interstate Highway 90 and 
extending north along I-90 to County Highway A, east along County A to 
U.S. Highway 12, southeast along U.S. 12 to State Highway 50, west 
along State 50 to State 120, then south along 120 to the Illinois 
border.
Central Flyway
    Colorado (Central Flyway Portion)
    Northern Front Range Area: All lands in Adams, Boulder, Clear 
Creek, Denver, Gilpin, Jefferson, Larimer, and Weld Counties west of I-
25 from the Wyoming border south to I-70; west on I-70 to the 
Continental Divide; north along the Continental Divide to the Jackson-
Larimer County Line to the Wyoming border.
    South Park/San Luis Valley Area: Alamosa, Chaffee, Conejos, 
Costilla, Custer, Fremont, Lake, Park, Teller, and Rio Grande Counties 
and those portions of Hinsdale, Mineral, and Saguache Counties east of 
the Continental Divide.
    North Park Area: Jackson County.
    Arkansas Valley Area: Baca, Bent, Crowley, Kiowa, Otero, and 
Prowers Counties.
    Pueblo County Area: Pueblo County.
    Remainder: Remainder of the Central Flyway portion of Colorado.
    Eastern Colorado Late Light Goose Area: that portion of the State 
east of Interstate Highway 25.
    Kansas
    Light Geese
    Unit 1: That portion of Kansas east of KS 99.

[[Page 50679]]

    Unit 2: The remainder of Kansas.
    Dark Geese
    Marais des Cygne Valley Unit: The area is bounded by the Missouri 
border to KS 68, KS 68 to U.S 169, U.S. 169 to KS 7, KS 7 to KS 31, KS 
31 to U.S. 69, U.S. 69 to KS 239, KS 239 to the Missouri border.
    South Flint Hills Unit: The area is bounded by Highways U.S. 50 to 
KS 57, KS 57 to U.S. 75, U.S. 75 to KS 39, KS 39 to KS 96, KS 96 to 
U.S. 77, U.S. 77 to U.S. 50.
    Central Flint Hills Unit: That area southwest of Topeka bounded by 
Highways U.S. 75 to I-35, I-35 to U.S. 50, U.S. 50 to U.S. 77, U.S. 77 
to I-70, I-70 to U.S. 75.
    Southeast Unit: That area of southeast Kansas bounded by the 
Missouri border to U.S. 160, U.S. 160 to U.S. 69, U.S. 69 to KS 39, KS 
39 to U.S. 169, U.S. 169 to the Oklahoma border, and the Oklahoma 
border to the Missouri border.
    Montana (Central Flyway Portion)
    Sheridan County: Includes all of Sheridan County.
    Remainder: Includes the remainder of the Central Flyway portion of 
Montana.
    Nebraska
    Dark Geese
    North Unit: Keya Paha County east of U.S. 183 and all of Boyd 
County, including the boundary waters of the Niobrara River, all of 
Knox County and that portion of Cedar County west of U.S. 81.
    East Unit: The area east of a line beginning at U.S. 183 at the 
northern State line; south to NE 2; east to U.S. 281; south to the 
southern State line, excluding the North Unit.
    West Unit: All of Nebraska west of the East Unit.
    Light Geese
    Rainwater Basin Light Goose Area: The area bounded by the 
intersection of the Platte River and U.S. Highway (Hwy) 92 in Polk 
County, east on Hwy 92 to NE Hwy 15, south on Hwy 15 to NE Hwy 4, west 
on NE Hwy 4 to U.S. Hwy 34, west on U.S. Hwy 34 to U.S. Hwy 283, north 
on U.S. Hwy 283 to U.S. Hwy 30, east on U.S. Hwy 30 to U.S. Hwy 281, 
south on U.S. Hwy 281 to NE Hwy 34 & 2, east on NE Hwy 34 to the Platte 
River, and then north and east along the Platte River to the beginning.
    Remainder of State: The remainder portion of Nebraska.
    New Mexico (Central Flyway Portion)
    Dark Geese
    Middle Rio Grande Valley Unit: Sierra County and that portion of 
Socorro County lying south of the Sevilleta National Wildlife Refuge 
Boundary.
    Remainder: The remainder of the Central Flyway portion of New 
Mexico.
    North Dakota
    Dark Geese
    Missouri River Zone: That area encompassed by a line extending from 
the South Dakota border north on U.S. 83 and I-94 to ND 41, north to ND 
53, west to U.S. 83, north to ND 23, west to ND 37, south to ND 1804, 
south approximately 9 miles to Elbowoods Bay on Lake Sakakawea, south 
and west across the lake to ND 8, south to ND 200, east to ND 31, south 
to ND 25, south to I-94, east to ND 6, south to the South Dakota 
border, and east to the point of origin.
    Statewide: All of North Dakota.
    South Dakota
    Canada Geese
    Unit 1: Statewide except for Units 2 and 3.
    Unit 2: Brule, Buffalo, Campbell, Dewey, Hughes, Hyde, Lyman, 
Potter, Stanley, Sully, and Walworth Counties and that portion of 
Corson County east of State Highway 65.
    Unit 3: Charles Mix and Gregory Counties.
    Texas
    West Unit: That portion of the State lying west of a line from the 
international toll bridge at Laredo; north along I-35 and I-35W to Fort 
Worth; northwest along US 81 and US 287 to Bowie; and north along US 81 
to the Oklahoma border.
    East Unit: Remainder of State.
    Wyoming (Central Flyway Portion)
    Area 1: Converse, Hot Springs, Natrona, and Washakie Counties, and 
that portion of Park County south of T58N.
    Area 2: Platte County.
    Area 3: Albany, Big Horn, Campbell, Crook, Fremont, Johnson, 
Laramie, Niobrara, Sheridan, and Weston Counties and those portions of 
Carbon County east of the Continental Divide and Park County north of 
T58N.
    Area 4: Goshen County.
Pacific Flyway
    Arizona
    GMU 22 and 23: Game Management Units 22 and 23.
    Remainder of State: The remainder of Arizona.
    California
    Northeastern Zone: That portion of the State east and north of a 
line beginning at the Oregon border; south and west along the Klamath 
River to the mouth of Shovel Creek; south along Shovel Creek to Forest 
Service Road 46N10; south and east along FS 46N10 to FS 45N22; west and 
south along FS 45N22 to U.S. 97 at Grass Lake Summit; south and west 
along U.S. 97 to I-5 at the town of Weed; south along I-5 to CA 89; 
east and south along CA 89 to the junction with CA 49; east and north 
on CA 49 to CA 70; east on CA 70 to U.S. 395; south and east on U.S. 
395 to the Nevada border.
    Colorado River Zone: Those portions of San Bernardino, Riverside, 
and Imperial Counties east of a line extending from the Nevada border 
south along U.S. 95 to Vidal Junction; south on a road known as 
``Aqueduct Road'' in San Bernardino County through the town of Rice to 
the San Bernardino-Riverside County line; south on a road known in 
Riverside County as the ``Desert Center to Rice Road'' to the town of 
Desert Center; east 31 miles on I-10 to the Wiley Well Road; south on 
this road to Wiley Well; southeast along the Army-Milpitas Road to the 
Blythe, Brawley, Davis Lake intersections; south on the Blythe-Brawley 
paved road to the Ogilby and Tumco Mine Road; south on this road to 
U.S. 80; east seven miles on U.S. 80 to the Andrade-Algodones Road; 
south on this paved road to the Mexican border at Algodones, Mexico.
    Southern Zone: That portion of southern California (but excluding 
the Colorado River Zone) south and east of a line extending from the 
Pacific Ocean east along the Santa Maria River to CA 166 near the City 
of Santa Maria; east on CA 166 to CA 99; south on CA 99 to the crest of 
the Tehachapi Mountains at Tejon Pass; east and north along the crest 
of the Tehachapi Mountains to CA 178 at Walker Pass; east on CA 178 to 
U.S. 395 at the town of Inyokern; south on U.S. 395 to CA 58; east on 
CA 58 to I-15; east on I-15 to CA 127; north on CA 127 to the Nevada 
border.
    Balance-of-the-State Zone: The remainder of California not included 
in the Northeastern, Southern, and the Colorado River Zones.
    Del Norte and Humboldt Area: The Counties of Del Norte and 
Humboldt.
    Sacramento Valley Area: That area bounded by a line beginning at 
Willows in Glenn County proceeding south on I-5 to Hahn Road north of 
Arbuckle in Colusa County; easterly on Hahn Road and the Grimes 
Arbuckle Road to Grimes on the Sacramento River; southerly on the 
Sacramento River to the Tisdale Bypass to O'Banion Road; easterly on 
O'Banion Road to CA 99; northerly on CA 99 to the Gridley-Colusa 
Highway in Gridley in Butte County; westerly on the Gridley-Colusa 
Highway to the River Road; northerly on the River Road to the Princeton 
Ferry; westerly across the Sacramento River to CA 45; northerly on CA 
45 to CA 162; northerly on CA 45-162 to Glenn; westerly on CA 162 to 
the point of beginning in Willows.
    Western Canada Goose Hunt Area: That portion of the above described

[[Page 50680]]

Sacramento Valley Area lying east of a line formed by Butte Creek from 
the Gridley-Colusa Highway south to the Cherokee Canal; easterly along 
the Cherokee Canal and North Butte Road to West Butte Road; southerly 
on West Butte Road to Pass Road; easterly on Pass Road to West Butte 
Road; southerly on West Butte Road to CA 20; and westerly along CA 20 
to the Sacramento River.
    San Joaquin Valley Area: That area bounded by a line beginning at 
Modesto in Stanislaus County proceeding west on CA 132 to I-5; 
southerly on I-5 to CA 152 in Merced County; easterly on CA 152 to CA 
165; northerly on CA 165 to CA 99 at Merced; northerly and westerly on 
CA 99 to the point of beginning.
    Colorado (Pacific Flyway Portion)
    Gunnison/Saguache Area: Gunnison County and that portion of 
Saguache County west of the Continental Divide.
    West Central Area: Archuleta, Delta, Dolores, LaPlata, Montezuma, 
Montrose, Ouray, San Juan, and San Miguel Counties and those portions 
of Hinsdale and Mineral Counties west of the Continental Divide.
    State Area: The remainder of the Pacific-Flyway Portion of 
Colorado.
    Idaho
    Zone 1: Benewah, Bonner, Boundary, Clearwater, Idaho, Kootenai, 
Latah, Lewis, Nez Perce, and Shoshone Counties.
    Zone 2: The Counties of Ada; Adams; Boise; Canyon; those portions 
of Elmore north and east of I-84, and south and west of I-84, west of 
ID 51, except the Camas Creek drainage; Gem; Owyhee west of ID 51; 
Payette; Valley; and Washington.
    Zone 3: The Counties of Blaine; Camas; Cassia; those portions of 
Elmore south of I-84 east of ID 51, and within the Camas Creek 
drainage; Gooding; Jerome; Lincoln; Minidoka; Owyhee east of ID 51; 
Power within the Minidoka National Wildlife Refuge; and Twin Falls.
    Zone 4: The Counties of Bear Lake; Bingham within the Blackfoot 
Reservoir drainage; Bonneville, Butte; Caribou except the Fort Hall 
Indian Reservation; Clark; Custer; Franklin; Fremont; Jefferson; Lemhi; 
Madison; Oneida; Power west of ID 37 and ID 39 except the Minidoka 
National Wildlife Refuge; and Teton.
    Zone 5: All lands and waters within the Fort Hall Indian 
Reservation, including private inholdings; Bannock County; Bingham 
County, except that portion within the Blackfoot Reservoir drainage; 
and Power County east of ID 37 and ID 39.
    In addition, goose frameworks are set by the following geographical 
areas:
    Northern Unit: Benewah, Bonner, Boundary, Clearwater, Idaho, 
Kootenai, Latah, Lewis, Nez Perce, and Shoshone Counties.
    Southwestern Unit: That area west of the line formed by U.S. 93 
north from the Nevada border to Shoshone, northerly on ID 75 (formerly 
U.S. 93) to Challis, northerly on U.S. 93 to the Montana border (except 
the Northern Unit and except Custer and Lemhi Counties).
    Southeastern Unit: That area east of the line formed by U.S. 93 
north from the Nevada border to Shoshone, northerly on ID 75 (formerly 
U.S. 93) to Challis, northerly on U.S. 93 to the Montana border, 
including all of Custer and Lemhi Counties.
    Montana (Pacific Flyway Portion)
    East of the Divide Zone: The Pacific Flyway portion of the State 
located east of the Continental Divide.
    West of the Divide Zone: The remainder of the Pacific Flyway 
portion of Montana.
    Nevada
    Lincoln Clark County Zone: All of Lincoln and Clark Counties
    Remainder-of-the-State Zone: The remainder of Nevada.
    New Mexico (Pacific Flyway Portion)
    North Zone: The Pacific Flyway portion of New Mexico located north 
of I-40.
    South Zone: The Pacific Flyway portion of New Mexico located south 
of I-40.
    Oregon
    Southwest Zone: Douglas, Coos, Curry, Josephine and Jackson 
Counties.
    Northwest Special Permit Zone: That portion of western Oregon west 
and north of a line running south from the Columbia River in Portland 
along I-5 to OR 22 at Salem; then east on OR 22 to the Stayton Cutoff; 
then south on the Stayton Cutoff to Stayton and due south to the 
Santiam River; then west along the north shore of the Santiam River to 
I-5; then south on I-5 to OR 126 at Eugene; then west on OR 126 to 
Greenhill Road; then south on Greenhill Road to Crow Road; then west on 
Crow Road to Territorial Hwy; then west on Territorial Hwy to OR 126; 
then west on OR 126 to OR 36; then north on OR 36 to Forest Road 5070 
at Brickerville; then west and south on Forest Road 5070 to OR 126; 
then west on OR 126 to the Pacific Coast.
    Northwest Zone: Those portions of Clackamas, Lane, Linn, Marion, 
Multnomah, and Washington Counties outside of the Northwest Special 
Permit Zone.
    Closed Zone: Those portions of Coos, Curry, Douglas and Lane 
Counties west of US 101.
    Eastern Zone: Hood River, Wasco, Sherman, Gilliam, Morrow, 
Umatilla, Deschutes, Jefferson, Crook, Wheeler, Grant, Baker, Union, 
and Wallowa Counties.
    Harney, Klamath, Lake and Malheur Counties Zone: All of Harney, 
Klamath, Lake, and Malheur Counties.
    Utah
    Washington County Zone: All of Washington County.
    Remainder-of-the-State Zone: The remainder of Utah.
    Washington
    Eastern Washington: All areas east of the Pacific Crest Trail and 
east of the Big White Salmon River in Klickitat County.
    Area 1: Lincoln, Spokane, and Walla Walla Counties; that part of 
Grant County east of a line beginning at the Douglas-Lincoln County 
line on WA 174, southwest on WA 174 to WA 155, south on WA 155 to US 2, 
southwest on US 2 to Pinto Ridge Road, south on Pinto Ridge Road to WA 
28, east on WA 28 to the Stratford Road, south on the Stratford Road to 
WA 17, south on WA 17 to the Grant-Adams County line; those parts of 
Adams County east of State Highway 17; those parts of Franklin County 
east and south of a line beginning at the Adams-Franklin County line on 
WA 17, south on WA 17 to US 395, south on US 395 to I-182, west o I-182 
to the Franklin-Benton County line; those parts of Benton County south 
of I-182 and I-82; and those parts of Klickitat County east of U.S. 
Highway 97.
    Area 2: All of Okanongan, Douglas, and Kittitas Counties and those 
parts of Grant, Adams, Franklin, and Benton Counties not included in 
Eastern Washington Goose Management Area 1.
    Area 3: All other parts of eastern Washington not included in 
Eastern Washington Goose Management Areas 1 and 2.
    Western Washington: All areas west of the East Zone.
    Area 1: Skagit, Island, and Snohomish Counties.
    Area 2: Clark, Cowlitz, Pacific, and Wahkiakum Counties.
    Area 3: All parts of western Washington not included in Western 
Washington Goose Management Areas 1 and 2.
    Lower Columbia River Early-Season Canada Goose Zone: Beginning at 
the Washington-Oregon border on the I-5 Bridge near Vancouver, 
Washington; north on I-5 to Kelso; west on Highway 4 from Kelso to 
Highway 401; south and west on Highway 401 to Highway 101 at the 
Astoria-Megler Bridge; west on Highway 101 to Gray Drive in the City of 
Ilwaco; west on Gray Drive to Canby Road; southwest on Canby Road to 
the

[[Page 50681]]

North Jetty; southwest on the North Jetty to its end; southeast to the 
Washington-Oregon border; upstream along the Washington-Oregon border 
to the point of origin.
    Wyoming (Pacific Flyway Portion): See State Regulations.
    Bear River Area: That portion of Lincoln County described in State 
regulations.
    Salt River Area: That portion of Lincoln County described in State 
regulations.
    Eden-Farson Area: Those portions of Sweetwater and Sublette 
Counties described in State regulations.

Swans

Central Flyway
    South Dakota: Beadle, Brookings, Brown, Campbell, Clark, Codington, 
Deuel, Day, Edmunds, Faulk, Grant, Hamlin, Hand, Hughes, Hyde, 
Kingsbury, Marshall, McPherson, Potter, Roberts, Spink, Sully, and 
Walworth Counties.
Pacific Flyway
    Montana (Pacific Flyway Portion)
    Open Area: Cascade, Chouteau, Hill, Liberty, and Toole Counties and 
those portions of Pondera and Teton Counties lying east of U.S. 287-89.
    Nevada
    Open Area: Churchill, Lyon, and Pershing Counties.
    Utah
    Open Area: Those portions of Box, Elder, Weber, Davis, Salt Lake, 
and Toole Counties lying south of State Hwy 30, I-80/84, west of I-15, 
and north of I-80.
[FR Doc. 96-24733 Filed 9-25-96; 8:45 am]
BILLING CODE 4310-55-F

Complete official Federal Register PDF

FR Doc. 96-24726 Correction of Trading Records
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50431-50432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24726]

=======================================================================
-----------------------------------------------------------------------

COMMODITY FUTURES TRADING COMMISSION

17 CFR Part 1

Correction of Trading Records

AGENCY: Commodity Futures Trading Commission.

ACTION: Final rule clarification.

-----------------------------------------------------------------------

SUMMARY: On June 6, 1996, the Commodity Futures Trading Commission 
(``Commission'' or ``CFTS'') published a proposed rule amendment to its 
regulation to clarify a procedure specified for the correction of 
erroneous information on trading cards and to make that procedure 
applicable to other trading records.\1\ After consideration of comments 
received, the Commission published a final rule amendment on August 20, 
1996.\2\ One comment letter inadvertently was not mentioned in that 
release.

    \1\ 61 FR 28806 (June 6, 1996).
    \2\ 61 FR 42999 (August 20, 1996).
---------------------------------------------------------------------------

EFFECTIVE DATE: The final rule will become effective October 21, 1996.

FOR FURTHER INFORMATION CONTACT:
Duane C. Andresen, Special Counsel, Division of Trading and Markets, 
Commodity Futures Trading Commission, Three Lafayette Centre, 1155 21st 
Street, NW., Washington, DC 20581. Telephone: (202) 418-5490.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The Commission amended Commission Regulation 1.35(d)(7), which 
addresses the preparation, submission and correction of trading cards, 
to make its provisions applicable to all trading records. The 
Commission also amended the error correction procedures in paragraph 
(d)(7)(ii) to state that a member may correct any errors by crossing 
out erroneous information without obliterating or otherwise making 
illegible any of the originally recorded information. The Commission 
further amended paragraph (d)(7)(ii) to require that when errors on a 
trading card are corrected by rewriting the trading card, the member 
must submit a ply of the trading card, or in the absence of plies the 
original trading card, that is subsequently rewritten in accordance 
with contract market rules

[[Page 50432]]

which set forth the required collection schedule for trading cards.

II. Comment Received

    The comment letter not previously addressed was received from the 
Chicago Board of Trade (``CBT''). Many of the CBT's concerns were 
mentioned by other commenters and were considered prior to publication 
of the final rule amendment. Those concerns that were not specifically 
addressed are discussed below.

A. Applicability

    In its comment letter, the CBT stated that it is unclear what the 
Commission means by ``trading records prepared for `flashed' orders'' 
and, further, that the amendment should not be applicable to broker 
cards, which resemble trading cards and are used on a temporary basis 
until a broker or his broker assistant has an opportunity to formally 
endorse a written order ticket. The CBT stated that such cards are not 
required to be used and not relied upon as an original source document 
for clearing purposes. The CBT also stated that the amendment should 
not be applicable to desk clerks recording customers' order 
instructions.
    The provisions of the amendment are applicable to trading records 
prepared by a member of a contract market pursuant to contract market 
rules. Thus, the provisions would be applicable to such trading records 
as broker cards prepared for ``flashed'' orders if the broker cards 
were prepared pursuant to contract market rules.\3\
---------------------------------------------------------------------------

    \3\ For example, the amendment's provisions would be applicable 
to broker cards prepared pursuant to the CBT's Notice: Documentation 
Required to Comply with CFTC's Order Regarding Immediately 
Executable Flashed Orders, submitted for Commission review by letter 
dated August 5, 1996.
---------------------------------------------------------------------------

    With regard to desk clerks recording customers' order instructions, 
the provisions of the amendment are specifically applicable to order 
tickets prepared under Regulation 1.35(a-1) (2), (3) or (4) or received 
on the floor through electronic order routing systems. Desk clerks 
correcting order instructions on the original order would be required 
to correct the erroneous information, or reflect changed instructions 
received from the customer, without obliterating or otherwise making 
illegible any of the originally recorded information.

B. Trading Card Provision

    The Commission specifically requested comment regarding the trading 
card provision that permits correction of erroneous information by 
rewriting the trading card. The CBT stated that the provision should be 
retained, since members remain accountable for trading cards which are 
subsequently rewritten.
    The Commission determined to retain the provision that permits the 
correction of erroneous information on trading cards by rewriting the 
trading card. However, the Commission amended paragraph (d)(7)(ii) to 
add the requirement that the member must submit a ply of the trading 
card, or in the absence of plies the original trading card, that 
subsequently is rewritten in accordance with contract market rules 
which set forth the required collection schedule for trading cards.

III. Conclusion

    The Commission has carefully reviewed and considered this comment 
and believes that the commenter's concerns have been addressed.

    Issued in Washington, DC, on September 20, 1996 by the 
Commission.
Jean A. Webb,
Secretary of the Commission.
[FR Doc. 96-24726 Filed 9-25-96; 8:45 am]
BILLING CODE 6351-01-M

Complete official Federal Register PDF

FR Doc. 96-24722 International Meeting on Implementation
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Page 50425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24722]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Food Safety and Inspection Service

9 CFR Parts 304, 308, 310, 320, 327, 381, 416, and 417

[Docket No. 93-016-4N]

International Meeting on Implementation

AGENCY: Food Safety and Inspection Service, USDA.

ACTION: Notice of meeting.

-----------------------------------------------------------------------

SUMMARY: The Food Safety and Inspection Service (FSIS) is holding a 
briefing, ``International Meeting on Implementation,'' to discuss with 
representatives of foreign countries how the final rule, ``Pathogen 
Reduction; Hazard Analysis and Critical Control Point (HACCP) 
Systems,'' will be implemented in the United States.

DATES: The public hearing will be held on October 8, 1996, from 8:30 
a.m. until 5:00 p.m. Registration will begin at 8:00 a.m.

ADDRESSES: The conference will be held at the U.S. Department of 
Agriculture, 1400 Independence Avenue, SW, Back of the South Building 
Cafeteria (between the 2nd and 3rd Wings).

FOR FURTHER INFORMATION CONTACT: To register for the conference, call 
(703) 812-6299 for international calls; (800) 485-4429 for domestic 
calls; FAX (202) 501-7642, or E-mail usdafsis/[email protected]. 
If you require a sign language interpreter or other special 
accommodations, contact Ms. Shelia Johnson at (202) 501-7138 by October 
1, 1996.

SUPPLEMENTARY INFORMATION: On July 25, 1996, FSIS published a final 
rule, ``Pathogen Reduction; Hazard Analysis and Critical Control Point 
(HACCP) Systems'' (61 FR 38805). This rule introduced sweeping changes 
to the U.S. meat and poultry inspection system. FSIS is holding a 
series of meetings to discuss the implementation of the rule.
    On October 8, 1996, FSIS officials will brief representatives of 
foreign countries on how the Agency will implement the ``Pathogen 
Reduction/HACCP'' final rule domestically. At the briefing, there will 
be presentations about Sanitation Standard Operating Procedures, E. 
coli verification testing, HACCP requirements, and Salmonella testing. 
After the presentations, FSIS officials will answer questions.

    Done at Washington, DC, on September 18, 1996.
Michael R. Taylor,
Acting Under Secretary for Food Safety.
[FR Doc. 96-24722 Filed 9-23-96; 2:18 pm]
BILLING CODE 3410-DM-P

Complete official Federal Register PDF

FR Doc. 96-24721 Public Hearing on Criteria for Equivalence of Foreign Inspection Systems
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50425-50426]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24721]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
9 CFR Parts 304, 308, 310, 320, 327, 381, 416, and 417

[Docket No. 93-016-5N]

Public Hearing on Criteria for Equivalence of Foreign Inspection 
Systems

AGENCY: Food Safety and Inspection Service, USDA.

ACTION: Notice of meeting.

-----------------------------------------------------------------------

SUMMARY: The Food Safety and Inspection Service (FSIS) will hold a 
hearing, ``Public Hearing on Criteria for Equivalence of Foreign 
Inspection Systems,'' to discuss issues related to the equivalence of 
foreign inspection systems to the United States' system. At the 
hearing, FSIS will provide material outlining the issues involved in 
determining the equivalence of foreign inspection systems. Participants 
will have the opportunity to discuss this material and present their 
own information and views related to the

[[Page 50426]]

equivalence of foreign inspection systems.

DATES: The public hearing will be held on October 9 and 10, 1996, from 
8:30 a.m. until 5:00 p.m. Registration and distribution of meeting 
materials will begin at 8:00 a.m. on October 9, 1996.

ADDRESSES: The hearing will be held at the U.S. Department of 
Agriculture, 1400 Independence Avenue, SW, Back of the South Building 
Cafeteria (between the 2nd and 3rd Wings). Send an original and two 
copies of comments on equivalence issues to: FSIS Docket Clerk, DOCKET 
#93-016-5N, U.S. Department of Agriculture, Food Safety and Inspection 
Service, Room 3806, 1400 Independence Avenue, S.W., Washington, DC 
20250-3700.

FOR FURTHER INFORMATION CONTACT: To register for the hearing and obtain 
advance copies of reference material, call (703) 812-6299 for 
international calls; (800) 485-4429 for domestic calls; FAX (202) 501-
7642, or E-mail usdafsis/[email protected]. If you require a 
sign language interpreter or other special accommodations, contact Ms. 
Shelia Johnson at (202) 501-7138 by October 1, 1996.

SUPPLEMENTARY INFORMATION: On December 8, 1994, the President of the 
United States signed into law the Uruguay Round Agreements Act, PL 103-
465 (108 Stat 4966). Among other things, this Act modified U.S. laws to 
ensure consistency with the new agreements. For example, the Federal 
Meat Inspection Act and the Poultry Products Inspection Act were 
modified so that foreign countries wishing to export meat and poultry 
products to the United States must have inspection system controls 
``equivalent to'' those of the United States. To be consistent with the 
new language in the Acts, FSIS published a direct final rule on July 
28, 1995, amending its regulations pertaining to foreign countries 
inspection systems by replacing the phrase ``at least equal to'' with 
the words ``equivalent to'' (60 FR 38667).
    FSIS has been examining the application of ``equivalence'' as it 
relates to meat and poultry trade between countries. To gather 
information from the public relating to issues of equivalence, FSIS 
will hold a hearing, ``Public Hearing on Criteria for Equivalence of 
Foreign Inspection Systems,'' on October 9 and 10. The hearing will 
focus on such issues as: the definition of ``equivalence,'' risk 
assessment, features of systems used to determine equivalence, sanitary 
measures, Hazard Analysis and Critical Control Point (HACCP) systems, 
microbiological standards, and inspection activities carried out by 
parties other than Government officials. For hearing participants 
wishing to receive advanced copies of reference material to be made 
available at the hearing, see FOR FURTHER INFORMATION CONTACT.
    At the hearing, there will be an opportunity for participants to 
discuss the equivalence issues addressed in the reference material. 
Also, written comments may be submitted to the FSIS Docket Room (See 
ADDRESSES).

    Done at Washington, DC, on September 20, 1996.
Michael R. Taylor,
Acting Under Secretary for Food Safety.
[FR Doc. 96-24721 Filed 9-23-96; 2:18 pm]
BILLING CODE 3410-DM-P

Complete official Federal Register PDF

FR Doc. 96-24720 Safety Standards for First Aid at Metal and Nonmetal Mines
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50432-50436]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24720]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Mine Safety and Health Administration

30 CFR Parts 56 and 57

RIN 1219-AA97

Safety Standards for First Aid at Metal and Nonmetal Mines

AGENCY: Mine Safety and Health Administration, Labor.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule revises existing standards at metal and 
nonmetal mines, requiring first aid capability to be available in the 
event a miner is injured. The final rule provides operators more 
flexibility and clarifies requirements for persons trained in first 
aid.

EFFECTIVE DATE: December 26, 1996.

FOR FURTHER INFORMATION CONTACT: Patricia W. Silvey, Director; Office 
of Standards, Regulations, and Variances, MSHA; 703-235-1910 (voice), 
703-235-5551 (facsimile), [email protected] (Internet e-mail).

SUPPLEMENTARY INFORMATION:

I. Rulemaking Background

    Sections 56/57.18010, requiring first aid training, were originally 
promulgated as advisory standards on July 31, 1969, and made mandatory 
on August 29, 1973. MSHA issued Program Policy Letter (PPL) No. P94-IV-
2 on October 3, 1994, to underscore the first aid requirements. MSHA 
withdrew the PPL by notice in the Federal Register (60 FR 9986) on 
February 22, 1995, and began a new procedure for formulating certain 
policies with increased participation by the mining community. MSHA 
asked the mining community to comment on the issues and to help with 
development of a policy for the first aid standard.
    By letter of August 25, 1995, the National Mining Association (NMA) 
petitioned the Secretary of Labor requesting that MSHA institute 
rulemaking, rather than develop policy on the first aid issue, and 
suggested language for a new standard. The NMA recommended that MSHA 
develop a new rule to require that an individual capable of providing 
first aid be available on all shifts and that first aid training be 
made available to all interested miners. The recommendation from NMA 
addressed mutual concerns of MSHA and the mining industry.
    In lieu of finalizing a first aid policy, MSHA used NMA's 
recommendation as the basis for a proposed first aid rule published in 
the Federal Register (60 FR 55150) on October 27, 1995. MSHA received 
comments from organized labor, industry associations, mining 
contractors, and medical personnel first aid trainers, all of which 
were considered in developing the final rule. MSHA also reviewed and 
considered written comments previously submitted to the Agency on its 
draft policy letter. One request for a public hearing was received, but 
it was subsequently withdrawn.

II. Discussion and Summary of the Final Rule

A. General Discussion

    Mining has historically experienced one of the highest rates of 
severe injuries among its employees of any major industry group in 
America. Despite significant long-term improvements in safety and 
health, in the three-year period from 1993 through 1995, mine operators 
and independent contractors reported 226 amputations among the 
approximately 225,000 miners in the metal and nonmetal industry. During 
the same period, over 500 burns; 1500 fractures; and 1200 cuts, 
lacerations, or punctures resulted in time lost from work. The 
frequency and severity of injuries in the mining industry and the 
remoteness of many operations and working places require a skilled 
first aid response, the first level of care for many injured miners.
    First aid is basic emergency treatment rendered on-site as soon as 
possible

[[Page 50433]]

after an injury occurs and is intended to help a victim until medical 
care arrives. In severe instances, first aid typically precedes two 
subsequent care levels: a secondary level often performed by 
paraprofessionals, such as emergency medical technicians (EMT's), and 
full medical care performed by professionals, such as physicians and 
nurses.
    Existing MSHA standards at Secs. 56/57.18010 provide that: 
``Selected supervisors shall be trained in first aid. First aid 
training shall be made available to all interested employees.'' The 
primary purpose of these standards is to assure that a responsible 
person, trained to provide first aid, is available to render assistance 
in the event a miner is injured. An additional purpose is to encourage 
first aid education among miners so that they are able to help an 
injured co-worker or even provide self-treatment.
    The existing standards identify supervisors as the persons required 
to receive first aid training. Supervisors are typically more mobile 
than other workers. Companies often provide transportation to 
supervisors so they can quickly access areas of the mine in the 
performance of their duties. Traditionally, supervisors are present 
where work is performed and injuries are most likely to occur.
    Since the existing standards were first promulgated, however, there 
has been significant progress in emergency response care and conditions 
in the mining industry. At a number of mines, medical paraprofessionals 
or professionals are members of mine workforces and able to render 
skilled help at mine properties. This rulemaking takes into account 
these developments.

B. Discussion of Final Rule

    Final Secs. 56/57.18010 require that an individual capable of 
providing first aid be available on all shifts. This individual must be 
currently trained and have the skills to perform patient assessment and 
artificial respiration; control bleeding; and treat shock, wounds, 
burns, and musculoskeletal injuries. Operators must make first aid 
training available to all interested miners.
    The final rule adopts the proposal with two changes: it expressly 
requires that the individual be currently trained and it deletes the 
requirement for transportation and handling skills. MSHA received 
comments that addressed many aspects of the proposal as discussed 
below.
Individual With First Aid Skills
    The final rule requires that operators have an individual capable 
of providing first aid. Some commenters suggested that operators should 
be allowed to use any medical personnel and paraprofessionals, such as 
nurses or EMT's, to satisfy the first aid standard whether or not that 
person is a supervisor. Another commenter said that the term 
``individual'' should be interpreted to refer to any miner, even if the 
miner is not a professional medical service provider. One commenter 
asked whether a security guard could fulfill the requirements of the 
proposal.
    A primary reason for this rulemaking is to broaden the scope of the 
rule to permit any person, regardless of title, to provide first aid. 
Under the final rule, operators will have the flexibility to use anyone 
who meets the requirements.
    One commenter raised a concern that a miner could become an agent 
of the company when the miner is available to provide first aid. The 
final rule requires that operators have a capable individual available 
who can perform first aid. The operator has the responsibility to 
arrange for this first aid coverage. An individual's assignment for 
purposes of this coverage does not make that person an ``agent'' in the 
sense of being empowered to act as a representative of the operator.

Capability

    One commenter was concerned that the proposed requirement for an 
individual ``capable'' of performing first aid would be open to 
subjective interpretation. This commenter asked how MSHA would 
interpret such a requirement. Commenters generally pointed to training 
as the means to establish capability and raised the issue of what type 
of training was contemplated. While the existing rule requires that 
supervisors ``be trained,'' the proposal contained no expressed 
training requirement other than that first aid training be made 
available to interested miners.
    The final rule expressly provides that the individual must be 
``currently trained'' and have certain specified first aid skills. The 
individual who is so trained and skilled is ``capable.'' To be 
``currently trained'' means that the individual must have received in-
depth first aid training which covers the specific skills in the final 
regulation and that such training be up-to-date. Persons, such as 
EMT's, nurses, and physicians, with current licenses or certifications 
to practice, are considered ``currently trained'' under the final rule.
    One commenter suggested that first aid training be provided 
annually. Organizations with histories of successfully training 
individuals in first aid skills differ in the frequency, breadth, and 
depth of the retraining required to maintain competence. Some, such as 
the American Red Cross, use a different interval from annual retraining 
to maintain certification of competence. The American Red Cross's 
current standard course is initially an 8-hour program to receive 
certification. It requires retraining every three years to maintain a 
current certification. Training offered by similar organizations, such 
as local fire departments, also has varying retraining components.
    Rather than exclude or constrain programs that have effectively 
prepared individuals for rendering first aid, the final rule does not 
incorporate an annual retraining requirement. MSHA will accept the 
retraining requirements prescribed by the organization providing the 
initial training.
    One commenter said that first aid training taken to meet the 
existing requirements of 30 CFR part 48 should qualify individuals as 
``capable''. The commenter stated that part 48 training allows ample 
time for adequate first aid training.
    Part 48 training, however, may not automatically qualify an 
individual as capable since part 48 is a different type of training 
provision from the final rule. Part 48 requires basic first aid 
training for all miners. The final rule for Secs. 56/57.18010 requires 
that certain persons, trained and skilled in first aid, be available 
and that the more in-depth first aid training to acquire those skills 
be made available to interested miners.
    Part 48 was promulgated in 1978. It implements Section 115 of the 
Federal Mine Safety and Health Act of 1977 (Mine Act) 30 U.S.C. 825 
which was intended by Congress to prevent miners from being put to work 
before having received some safety and health training, including basic 
first aid.
    Part 48 requires training in many health and safety subjects. The 
24-hour training required of new surface miners must cover at least 
eleven other subjects besides first aid. The 8-hour annual refresher 
training must cover at least ten other subjects. Operators have sought 
flexibility to adjust the time spent on any one subject, particularly 
during annual refresher training, according to the accident experience 
and safety and health needs of the mine and the miners. An operator 
with a high number of back injuries, for example, may determine that 
miners need more training on proper lifting. To allocate

[[Page 50434]]

more time to lifting, first aid training might be curtailed. Under 
these circumstances, a brief review of first aid would not adequately 
train persons to maintain skills as required by Secs. 56/57.18010.
    MSHA will accept part 48 training for compliance with the final 
rule if it is sufficiently in-depth to develop the capability to 
perform the necessary first aid skills. In all instances, training that 
complies with this rule would satisfy the new miner training 
requirements for first aid under part 48 and annual refresher training 
requirements for the year in which it was received.
Availability
    Commenters asked that MSHA clarify the meaning of the terms 
``available'' and ``on all shifts.'' The concept of availability is 
critical to the purpose of the final rule and is intended to have its 
ordinary meaning--present and ready for use or at hand.
    The final rule requires that, if an injury occurs, a person skilled 
in first aid must be present at the site and must be able to be at the 
scene quickly. Individuals on-site are able to respond sooner because 
they are closer to the scene of an accident and know the mine. The 
likelihood of survival for a seriously injured miner would be greatly 
diminished if first aid treatment were not administered before off-site 
medical personnel could provide it. Operators also will have to plan to 
assure that this on-site coverage is provided during absences and 
vacations.
    One commenter questioned whether the person capable of providing 
first aid would be required underground and, if so, must the person be 
trained to go underground. The final rule revises current Sec. 57.18010 
and expressly applies to underground mines where first aid availability 
is a critical element of injury response planning. To be available, the 
first aid person must be prepared to provide first aid to injured 
miners promptly. An individual capable of first aid and located on the 
surface at an underground mine would not be available for miners 
underground in many cases because the time required to reach the 
injured person would be too long. For example, reaching some areas of 
an old underground mine may require traveling through a mile or more of 
old workings and could take an hour or more, depending on the 
availability of transportation. In those few cases where a first aid 
person on the surface is available to miners injured underground, such 
as some small adit mines, that person would have to be trained to go 
underground to the extent required by other MSHA standards.
    Similarly, to ensure availability under conditions of difficult 
access and remote work areas, an underground mine operator may be 
required to have more than one first aid person underground. This 
concept of availability also applies to surface mines where miners may 
be working in remote areas.
    One commenter suggested that the term ``readily'' be inserted in 
the standard before ``available'' to ensure a prompt response. 
``Available'' is commonly defined to mean present and ready for use or 
at hand. Adding the term ``readily'' would not increase miner 
protection and, therefore, this suggestion is not adopted in the final 
rule.
    Another commenter suggested that availability be established either 
by having the person present on-shift or reachable through radio 
contact. While such factors as communication, transportation, and 
presence on-shift help determine availability, they do not make a 
person available to provide first aid. For example, radio communication 
without the ability to reach an accident scene quickly would not meet 
the requirements of the final rule.
    The final rule provides that an individual skilled in first aid be 
available ``on all shifts.'' Commenters questioned which shifts need to 
be covered. One commenter said that only ``production'' shifts should 
be covered. Another commenter stated that the standard should apply 
``to all shifts where two or more miners are engaged in production, 
extraction, or maintenance activities.''
    Under the Mine Act, mining includes activities beyond those 
suggested by the comments. Production (excavation, extraction, and 
milling), development, stripping, construction, dismantling, 
maintenance, and abandonment comprise mining activities according to 
the Mine Act. All of these activities involve exposure to hazards that 
may require the application of first aid skills. The final rule retains 
the ``on all shifts'' wording to convey the breadth of these activities 
while keeping the language as simple as possible. The final rule does 
not apply, however, in the few instances when no mining activities 
occur, for example, when only security, sales, or office work is 
performed.
Independent Contractors
    One commenter suggested that independent contractors should be 
solely responsible for compliance with the rule for their own 
employees. Another commenter said that the rule's requirements should 
not apply when independent contractors are performing explosives-
related work, such as shot service, which can involve a single 
employee.
    Under the final rule, independent contractors will be treated the 
same as under other MSHA safety and health standards. Independent 
contractors working on mine property are responsible for compliance 
with MSHA regulations. In some instances, the mine operator and 
independent contractor are isolated from one another and a single 
individual capable of first aid could not be available for both. In 
those situations, each would be responsible for their own coverage. In 
other instances, the mine operator and independent contractor work in 
such close proximity that one can choose to provide first aid coverage 
for the other. In those situations, it is the mine operator's and 
independent contractor's responsibility to agree on the coverage and to 
coordinate and communicate its implementation. Consistent with MSHA's 
enforcement of the existing standard, mine operators and independent 
contractors have the flexibility to use anyone at the mine with the 
necessary skills and availability, regardless of employer.
    Mining activity can present hazards to an employee whether the 
employee is working alone or with another person. If an employee is 
alone and becomes injured, the ability to provide self-treatment could 
be critical to survival. The final rule, therefore, does not include an 
exception for miners or contractor employees working alone.
First Aid Skills
    Several commenters addressed the proposed first aid skills needed 
to establish capability. One commenter suggested that the required 
skills for those other than EMT's be limited to ``basic first aid such 
as for breathing, bleeding, and shock.'' This recommendation would 
exclude patient assessment and treatment of wounds, burns, breaks, 
sprains, and strains. MSHA's experience is that the injuries that occur 
in mines require assessment and treatment skills; the final rule, 
therefore, retains the proposed skill requirements, except as discussed 
below.
    This commenter also said that a good procedure for obtaining 
``outside medical assistance'' should be emphasized. Separate existing 
standards, however, already require operators to have suitable 
emergency communications and arrangements for obtaining medical 
assistance (Secs. 56/57.18012, 18014).
    One commenter suggested that cardiopulmonary resuscitation (CPR) be

[[Page 50435]]

added to the list of required skills. The commenter suggested that 
firefighting, extrication, and evacuation also be included. The ability 
to perform CPR competently can require additional patient assessment 
skills, physical dexterity, and endurance. Traditionally, CPR training 
has been a supplement to first aid training and is not always offered 
with first aid.
    The final rule does not require that first aid skills include CPR. 
Mine operators are encouraged, however, to add skills which are 
considered appropriate to their workforce and environment. Likewise, 
the final rule does not include the suggestion that persons be 
specially trained in firefighting, extrication, or evacuation. This 
suggestion exceeds the scope of first aid. In addition, existing 
standards require operators to train miners in these areas.
    One commenter recommended that the individuals capable of providing 
first aid be able to treat injuries from hazardous liquids and gases. 
The final rule requires skills for treatment of injuries from any 
source or cause. Skills in patient assessment and artificial 
respiration and treatment of shock and burns would have direct 
application to injuries from hazardous liquids and gases.
    The proposed rule would have required an individual to have the 
skills to handle and transport injured persons. One commenter stated 
that transportation is no longer taught in the American Red Cross's 
basic first aid course. The commenter pointed out that when 
transporting an injured person, particularly one with a neck or spinal 
injury, there is the potential to cause greater harm and possible 
paralysis. The commenter suggested that the handling and transportation 
of injured persons be deleted from the required skills under the final 
rule.
    MSHA agrees that mishandling and improper transportation of a 
victim with a serious neck or spinal injury presents a high potential 
to exacerbate the injury. The American Red Cross does not currently 
include separate instruction on transportation and handling of the 
injured in its standard first aid course, although it furnishes 
guidance about these subjects in an informational section of its 
textbook. The American Red Cross teaches that one of the most dangerous 
threats to any seriously injured victim is unnecessary movement. 
Further, the National Safety Council's course emphasizes that injured 
persons should be moved only if they are in immediate danger from their 
environment.
    Special training, experience, dexterity, and strength are often 
required to successfully handle or transport a victim with an injured 
spine. Emergency medical personnel have the skills to successfully 
handle and transport victims in these cases. Improvements in 
transportation and communications, and the widespread availability of 
emergency service present an alternative that MSHA believes is more 
protective of miner safety. Under current regulations at Secs. 56/
57.18014, operators must make advance arrangements for obtaining 
transportation for injured persons and emergency medical assistance 
beyond first aid. The final rule, therefore, does not include the skill 
requirements for transportation and handling of injured persons 
contained in the proposal.
Interested Miners
    The second sentence of the existing standard is revised in the 
final rule to require that training be available to all interested 
``miners'' rather than all interested ``employees.'' This is not a 
substantive change and merely conforms the rule's terminology with 
other MSHA standards. To comply with the rule, operators must inform 
miners of the training in advance, so the miners can plan to attend.
    One commenter questioned whether the operator must pay for first 
aid training. Consistent with the existing standard, the final rule 
requires the operator to make the training available to all interested 
miners. Therefore, to encourage the miners' attendance at the course, 
the operator must pay ordinary course expenses. The final rule, like 
the existing rule, does not address the issue of compensation for the 
miner's time.

III. Executive Order 12866 and the Regulatory Flexibility Act

    Executive Order 12866 requires that regulatory agencies assess both 
the costs and benefits of intended regulations. MSHA has determined 
that this rulemaking is not a significant regulatory action 
representing additional costs in excess of $100 million to a segment of 
the economy and, therefore, has not prepared a separate analysis of 
costs and benefits. The Regulatory Flexibility Act requires regulatory 
agencies to consider a rule's impact on small entities. For the purpose 
of the Regulatory Flexibility Act, MSHA policy defines a small entity 
as an operation employing fewer than 20 employees. This final rule 
would not have a significant economic impact on a substantial number of 
small entities. The analysis contained in this preamble meets MSHA's 
responsibilities under Executive Order 12866 and the Regulatory 
Flexibility Act.
    A few commenters were concerned that the rule would expand training 
and personnel requirements beyond part 48 and existing Secs. 56/
57.18010. One commenter stated that MSHA should prepare a regulatory 
analysis before proceeding further with the rulemaking.
    Operators are currently required to provide supervisors trained in 
first aid who, by virtue of their position, work with and are available 
to the workforce. There may be some operators, however, who have not 
provided this first aid coverage for the miners on all shifts under the 
existing rule. These operators may incur some additional costs to 
comply with the final rule. These costs, however, would be minimal and 
offset by the flexibility provided in the final rule.
    The final rule incorporates the National Mining Association's 
petition for rulemaking and broadens the scope of persons who can 
provide the first aid capability required by the standard. A mine 
operator can rely on existing, non- supervisory personnel who possess 
these special skills. Accordingly, MSHA has determined that this rule 
will not result in any significant costs to the mining industry.

IV. Paperwork Reduction Act

    This final rule contains no information collection or paperwork 
requirements subject to the Paperwork Reduction Act of 1995. The 
compiling and maintaining of records or other documentation of a 
miner's first aid training is incurred by mine operators in the normal 
course of their business activities. The burden associated with such 
usual and customary business records are excluded from the information 
collection burden under 5 CFR 1320.3(b)(2) (60 FR 44985).
    One commenter maintained that the rule would represent a 
significant burden by virtue of increased paperwork. It was suggested 
that MSHA accept a certification by the mine operator as sufficient 
evidence of the training. Currently, MSHA determines compliance with 
the existing requirements by reviewing documentation already kept by 
the mine operator, particularly course records. MSHA accepts available 
documentation, such as course completion certificates, diplomas, 
letters from a qualified instructor, or similar evidence. Under the 
final rule, MSHA would continue this practice.

V. Unfunded Mandates Reform Act

    Title II of the Unfunded Mandates Reform Act of 1995, Pub. L. 104-
4,

[[Page 50436]]

requires each Federal agency to assess the effects of Federal 
regulatory actions on state, local, and tribal governments and the 
private sector, other than to the extent such actions merely 
incorporate requirements specifically set forth in a statute, and to 
determine if the rule might significantly or uniquely affect small 
governments. MSHA has concluded that small governmental entities are 
not significantly or uniquely impacted by this regulation. The final 
rule will impact about 10,800 metal and nonmetal mining operations of 
which about 400 sand and gravel or crushed stone operations are run by 
state, local, or tribal governments for the construction and repair of 
highways and roads. These entities may incur some additional costs to 
comply with the final rule. These costs, however, would be minimal and 
offset by the flexibility provided in the final rule. Notwithstanding 
this conclusion, MSHA will mail a copy of the final rule to these 400 
entities.

List of Subjects in 30 CFR Parts 56 and 57

    Emergency medical services, Metal and nonmetal mines, Mine safety 
and health.

    Dated: September 18, 1996.
J. Davitt McAteer,
Assistant Secretary for Mine Safety and Health.

    Parts 56 and 57, subchapter N, chapter I, title 30 of the Code of 
Federal Regulations are amended as follows:

PART 56--[AMENDED]

    1. The authority citation for part 56 continues to read as follows:

    Authority: 30 U.S.C. 811.

    2. Section 56.18010 is revised to read as follows:

Sec. 56.18010  First aid.

    An individual capable of providing first aid shall be available on 
all shifts. The individual shall be currently trained and have the 
skills to perform patient assessment and artificial respiration; 
control bleeding; and treat shock, wounds, burns, and musculoskeletal 
injuries. First aid training shall be made available to all interested 
miners.

PART 57--[AMENDED]

    3. The authority citation for part 57 continues to read as follows:

    Authority: 30 U.S.C. 811.

    4. Section 57.18010 is revised to read as follows:

Sec. 57.18010  First aid.

    An individual capable of providing first aid shall be available on 
all shifts. The individual shall be currently trained and have the 
skills to perform patient assessment and artificial respiration; 
control bleeding; and treat shock, wounds, burns, and musculoskeletal 
injuries. First aid training shall be made available to all interested 
miners.

[FR Doc. 96-24720 Filed 9-25-96; 8:45 am]
BILLING CODE 4510-43-P

Complete official Federal Register PDF

FR Doc. 96-24717 Administrative Offset
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50444-50445]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24717]

=======================================================================
-----------------------------------------------------------------------

FEDERAL MARITIME COMMISSION

46 CFR Part 505

[Docket No. 96-15]

Administrative Offset

AGENCY: Federal Maritime Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule adopts, without change, the existing 
regulations on administrative offset promulgated by the Department of 
the Treasury as mandated by the Debt Collection Improvement Act of 
1996. The rule allows the Commission to collect by administrative 
offset any delinquent debt owed it and sets forth the minimum due 
process rights that must be provided to the debtor when the Commission 
seeks to collect a debt by administrative offset.

EFFECTIVE DATE: October 28, 1996.

FOR FURTHER INFORMATION CONTACT:
Robert D. Bourgoin, General Counsel, Federal Maritime Commission, 800 
North Capitol Street, NW., Washington, DC 20573, (202) 523-5740.

SUPPLEMENTARY INFORMATION: The Debt Collection Improvement Act of 1996, 
Pub. L. 104-134, Chapter 10, section 31001, 101 Stat. 1321-358 
(``Act''), requires that before collecting a claim by administrative 
offset, a federal agency must either adopt, without change, regulations 
on collecting by administrative offset promulgated by the Departments 
of Justice or Treasury or the General Accounting Office, or prescribe 
regulations on collecting by administrative offset consistent with the 
aforementioned regulations. Administrative offset means the withholding 
of funds otherwise payable by the United States to a person, or held by 
the U.S. for a person, to satisfy a claim or debt.
    In compliance with the Act, the Federal Maritime Commission adopts 
as a final rule the existing regulations of the Department of the 
Treasury set forth at 31 CFR 5.30 (1995), which incorporate the Federal 
Claims Collection Standards on administrative offset issued jointly by 
the Department of Justice and the General Accounting Office as set 
forth in 4 CFR 102.3. The purpose of the regulations is to protect the 
minimum due process rights that must be afforded to the debtor when an 
agency seeks to collect a debt by administrative offset, including the 
ability to verify, challenge, and compromise claims, and access to 
administrative appeals procedures which are both reasonable and protect 
the interests of the United States.
    Notice and an opportunity for public comment are not necessary 
prior to issuance of this final rule because it is interpretive in 
nature and implements a definitive statutory scheme mandated by the 
Act. In addition, notice and an opportunity for public comment are 
unnecessary inasmuch as both were provided previously when the Federal 
Claims Collection Standards were enacted, 49 FR 8897, March 9, 1984, 
and when the Treasury regulations were implemented, 52 FR 52, January 
2, 1987.
    The Commission certifies pursuant to the Regulatory Flexibility 
Act, 5 U.S.C. 605(b), that this rule will not have a significant 
economic impact on a substantial number of small entities, including 
small businesses, small organizational units, and small governmental 
jurisdictions because it merely facilitates collection of already 
incurred debts.
    The rule does not contain any collection of information 
requirements as defined by the Paperwork Reduction Act of 1995, as 
amended. Therefore, Office of Management and Budget review is not 
required.

List of Subjects in 46 CFR Part 505

    Administrative offset, Administrative practice and procedure, 
Claims, Debt collections.
    Part 505 of Title 46 of the Code of Federal Regulations is added to 
read as follows:

PART 505--ADMINISTRATIVE OFFSET

505.1  Scope of regulations.
505.2  Definitions.
505.3  General.
505.4  Notification procedures.
505.5  Agency review.
505.6  Written agreement for repayment.
505.7  Administrative offset.
505.8  Jeopardy procedure.

    Authority: 31 U.S.C. 3701; 31 U.S.C. 3711; 31 U.S.C. 3716.

Sec. 505.1  Scope of regulations.

    These regulations apply to the collection of debts owed to the 
United States arising from transactions with the Commission, or where a 
request for an offset is received by the Commission from another 
agency. These regulations are consistent with the Federal Claims 
Collection Standards on administrative offset issued jointly by the 
Department of Justice and the General Accounting Office as set forth in 
4 CFR 102.3.

Sec. 505.2  Definitions.

    (a) Administrative offset, as defined in 31 U.S.C. 3701(a)(1), 
means withholding money payable by the United States Government to, or 
held by the Government for, a person to satisfy a debt the person owes 
the Government.
    (b) Person includes a natural person or persons, profit or non-
profit corporation, partnership, association, trust, estate, 
consortium, or other entity which is capable of owing a debt to the 
United States Government except that agencies of the United States, or 
of any State or local government shall be excluded.

Sec. 505.3  General.

    (a) The Chairman or his or her designee, after attempting to 
collect a debt from a person under section 3(a) of the Federal Claims 
Collection Act of 1966, as assembled (31 U.S.C. 3711(a)), may collect 
the debt by administrative offset subject to the following:
    (1) The debt is certain in amount; and
    (2) It is in the best interests of the United States to collect the 
debt by administrative offset because of the decreased costs of 
collection and the acceleration in the payment of the debt.
    (b) The Chairman, or his or her designee, may initiate 
administrative offset with regard to debts owed by a person to another 
agency of the United States Government, upon receipt of a request from 
the head of another agency or his or her designee, and a certification 
that the debt exists and that the person has been afforded the 
necessary due process rights.

[[Page 50445]]

    (c) The Chairman, or his or her designee, may request another 
agency that holds funds payable to a Commission debtor to offset the 
debt against the funds held and will provide certification that:
    (1) The debt exists; and
    (2) The person has been afforded the necessary due process rights.
    (d) If the six-year period for bringing action on a debt provided 
in 28 U.S.C. 2415 has expired, then administrative offset may be used 
to collect the debt only if the costs of bringing such action are 
likely to be less than the amount of the debt.
    (e) No collection by administrative offset shall be made on any 
debt that has been outstanding for more than 10 years unless facts 
material to the Government's right to collect the debt were not known, 
and reasonably could not have been known, by the official or officials 
responsible for discovering and collecting such debt.
    (f) These regulations do not apply to:
    (1) A case in which administrative offset of the type of debt 
involved is explicitly provided for or prohibited by another statute; 
or
    (2) Debts owed by other agencies of the United States or by any 
State or local government.

Sec. 505.4  Notification procedures.

    Before collecting any debt through administrative offset, a notice 
of intent to offset shall be sent to the debtor by certified mail, 
return receipt requested, at the most current address that is available 
to the Commission. The notice shall provide:
    (a) A description of the nature and amount of the debt and the 
intention of the Commission to collect the debt through administrative 
offset;
    (b) An opportunity to inspect and copy the records of the 
Commission with respect to the debt;
    (c) An opportunity for review within the Commission of the 
determination of the Commission with respect to the debt; and
    (d) An opportunity to enter into a written agreement for the 
repayment of the amount of the debt.

Sec. 505.5  Agency review.

    (a) A debtor may dispute the existence of the debt, the amount of 
debt, or the terms of repayment. A request to review a disputed debt 
must be submitted to the Commission official who provided notification 
within 30 calendar days of the receipt of the written notice described 
in Sec. 505.4.
    (b) If the debtor requests an opportunity to inspect or copy the 
Commission's records concerning the disputed claim, 10 business days 
will be granted for the review. The time period will be measured from 
the time the request for inspection is granted or from the time the 
copy of the records is received by the debtor.
    (c) Pending the resolution of a dispute by the debtor, transactions 
in any of the debtor's account(s) maintained in the Commission may be 
temporarily suspended. Depending on the type of transaction the 
suspension could preclude its payment, removal, or transfer, as well as 
prevent the payment of interest or discount due thereon. Should the 
dispute be resolved in the debtor's favor, the suspension will be 
immediately lifted.
    (d) During the review period, interest, penalties, and 
administrative costs authorized under the Federal Claims Collection Act 
of 1996, as amended, will continue to accrue.

Sec. 505.6  Written agreement for repayment.

    A debtor who admits liability but elects not to have the debt 
collected by administrative offset will be afforded an opportunity to 
negotiate a written agreement for the repayment of the debt. If the 
financial condition of the debtor does not support the ability to pay 
in one lump-sum, reasonable installments may be considered. No 
installment arrangement will be considered unless the debtor submits a 
financial statement, executed under penalty of perjury, reflecting the 
debtor's assets, liabilities, income, and expenses. The financial 
statement must be submitted within 10 business days of the Commission's 
request for the statement. At the Commission's option, a confess-
judgment note or bond of indemnity with surety may be required for 
installment agreements. Notwithstanding the provisions of this section, 
any reduction or compromise of a claim will be governed by 4 CFR part 
103.

Sec. 505.7  Administrative offset.

    (a) If the debtor does not exercise the right to request a review 
within the time specified in Sec. 505.5 or if as a result of the 
review, it is determined that the debt is due and no written agreement 
is executed, then administrative offset shall be ordered in accordance 
with these regulations without further notice.
    (b) Requests for offset to other Federal agencies. The Chairman or 
his or her designee may request that funds due and payable to a debtor 
by another Federal agency be administratively offset in order to 
collect a debt owed to the Commission by that debtor. In requesting 
administrative offset, the Commission, as creditor, will certify in 
writing to the Federal agency holding funds of the debtor:
    (1) That the debtor owes the debt;
    (2) The amount and basis of the debt; and
    (3) That the agency has complied with the requirements of 31 U.S.C. 
3716, its own administrative offset regulations and the applicable 
provisions of 4 CFR part 102 with respect to providing the debtor with 
due process.
    (c) Requests for offset from other Federal agencies. Any Federal 
agency may request that funds due and payable to its debtor by the 
Commission be administratively offset in order to collect a debt owed 
to such Federal agency by the debtor. The Commission shall initiate the 
requested offset only upon:
    (1) Receipt of written certification from the creditor agency:
    (i) That the debtor owes the debt;
    (ii) The amount and basis of the debt;
    (iii) That the agency has prescribed regulations for the exercise 
of administrative offset; and
    (iv) That the agency has complied with its own administrative 
offset regulations and with the applicable provisions of 4 CFR part 
102, including providing any required hearing or review.
    (2) A determination by the Commission that collection by offset 
against funds payable by the Commission would be in the best interest 
of the United States as determined by the facts and circumstances of 
the particular case, and that such offset would not otherwise be 
contrary to law.

Sec. 505.8  Jeopardy procedure.

    The Commission may effect an administrative offset against a 
payment to be made to the debtor prior to the completion of the 
procedures required by Secs. 505.4 and 505.5 of this part if failure to 
take the offset would substantially jeopardize the Commission's ability 
to collect the debt, and the time before the payment is to be made does 
not reasonably permit the completion of those procedures. Such prior 
offset shall be promptly followed by the completion of those 
procedures. Amounts recovered by offset but later found not to be owed 
to the Commission shall be promptly refunded.

    By the Commission.
Joseph C. Polking,
Secretary.
[FR Doc. 96-24717 Filed 9-25-96; 8:45 am]
BILLING CODE 6730-01-M

Complete official Federal Register PDF

FR Doc. 96-24670 Fisheries of the Exclusive Economic Zone off Alaska; Northern Rockfish in the Western Regulatory Area
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Page 50458]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24670]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 679

[Docket No. 960129018-6018-01; I.D. 091996B]

Fisheries of the Exclusive Economic Zone off Alaska; Northern 
Rockfish in the Western Regulatory Area

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Modification of a closure.

-----------------------------------------------------------------------

SUMMARY: NMFS is opening directed fishing for northern rockfish in the 
Western Regulatory Area of the Gulf of Alaska (GOA). This action is 
necessary to fully utilize the total allowable catch (TAC) of northern 
rockfish in that area.

EFFECTIVE DATE: 1200 hrs, Alaska local time (A.l.t.), October 1, 1996, 
until 2400 hrs, A.l.t., December 31, 1996.

FOR FURTHER INFORMATION CONTACT: Thomas Pearson, 907-486-6919.

SUPPLEMENTARY INFORMATION: The groundfish fishery in the GOA exclusive 
economic zone is managed by NMFS according to the Fishery Management 
Plan for Groundfish of the Gulf of Alaska (FMP) prepared by the North 
Pacific Fishery Management Council under authority of the Magnuson 
Fishery Conservation and Management Act. Fishing by U.S. vessels is 
governed by regulations implementing the FMP at subpart H of 50 CFR 
part 600 and 50 CFR part 679.
    In accordance with Sec. 679.20(c)(3)(ii), the annual TAC for 
northern rockfish in the Western Regulatory Area of the GOA was 
established by the Final 1996 Harvest Specifications of Groundfish (61 
FR 4304, February 5, 1996) as 640 metric tons (mt). The directed 
fishery for northern rockfish in the Western Regulatory Area of the GOA 
was closed to directed fishing under Sec. 679.20(d)(1)(iii) in order to 
reserve amounts anticipated to be needed for incidental catch in other 
fisheries (61 FR 37226, July 17, 1996). NMFS has determined that, as of 
September 7, 1996, 527 mt remain in the directed fishing allowance.
    The Administrator, Alaska Region, NMFS, has determined that the 
1996 directed fishing allowance of northern rockfish in the Western 
Regulatory Area of the GOA has not been reached. Therefore, NMFS is 
terminating the previous closure and is opening directed fishing for 
northern rockfish in the Western Regulatory Area of the GOA.
    All other closures remain in full force and effect.

Classification

    This action is taken under Sec. 679.20 and is exempt from review 
under E.O. 12866.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: September 20, 1996.
Gary C. Matlock,
Director, Office of Sustainable Fisheries, National Marine Fisheries 
Service.
[FR Doc. 96-24670 Filed 9-25-96; 8:45 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-24669 1996 Marketing Quota and Price Support for Burley Tobacco
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50423-50425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24669]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Farm Service Agency

7 CFR Part 723

Commodity Credit Corporation

7 CFR Part 1464

RIN 0560-AE47

1996 Marketing Quota and Price Support for Burley Tobacco

AGENCIES: Farm Service Agency and Commodity Credit Corporation, USDA.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The purpose of this final rule is to codify determinations 
made by the Secretary of Agriculture (Secretary) with respect to the 
1996 crop of burley tobacco. The Secretary determined the

[[Page 50424]]

1996 marketing quota for burley tobacco to be 633.8 million pounds, and 
the 1996 price support level to be 173.7 cents per pound.

EFFECTIVE DATE: February 1, 1996.

FOR FURTHER INFORMATION CONTACT: Robert Tarczy, FSA, USDA, room 5750, 
South Building, P.O. Box 2415, STOP 0514, Washington, DC 20013-2415, 
telephone 202 720-5346.

SUPPLEMENTARY INFORMATION:

Executive Order 12866

    This final rule has been determined to be significant for purposes 
of Executive Order 12866 and has been reviewed by OMB under Executive 
Order 12866.

Federal Assistance Program

    The title and number of the Federal Assistance Program, as found in 
the Catalog of Federal Domestic Assistance, to which this rule applies, 
are Commodity Loans and Purchases--10.051.

Executive Order 12778

    This final rule has been reviewed in accordance with Executive 
Order 12778, Civil Justice Reform. The provisions of this rule do not 
preempt State laws, are not retroactive, and do not involve 
administrative appeals.

Regulatory Flexibility Act

    It has been determined that the Regulatory Flexibility Act is not 
applicable to this final rule because the Farm Service Agency (FSA) is 
not required by 5 U.S.C. 553 or any other provision of law to publish a 
notice of proposed rulemaking with respect to the subject matter of 
this rule.

Paperwork Reduction Act

    The amendments to 7 CFR parts 723 and 1464 set forth in this final 
rule do not contain any information collection requirements that 
require clearance through the Office of Management and Budget under the 
provisions of the Paperwork Reduction Act of 1995.

Statutory Background

    This rule is issued pursuant to the provisions of the Agricultural 
Adjustment Act of 1938 (the 1938 Act) and the Agricultural Act of 1949 
(the 1949 Act.) Section 1108(c) of Public Law 99-272 provides that the 
determinations made in this rule are not subject to the provisions for 
public participation in rulemaking contained in 5 U.S.C. 553 or in any 
directive of the Secretary.
    On February 1, 1996, the Secretary announced the national marketing 
quota and the price support level for the 1996 crop of burley tobacco. 
A number of related determinations were made at the same time, which 
this final rule also affirms.

Marketing Quota

    Section 319(c)(3)(A)(B) of the 1938 Act provides, in part, that the 
national marketing quota for a marketing year for burley tobacco is the 
quantity of such tobacco that is not more than 103 percent nor less 
than 97 percent of the total of: (1) The amount of burley tobacco that 
domestic manufacturers of cigarettes estimate they intend to purchase 
on U.S. auction markets or from producers, (2) the average quantity 
exported annually from the U.S. during the 3 marketing years 
immediately preceding the marketing year for which the determination is 
being made, and (3) the quantity, if any, that the Secretary, in the 
Secretary's discretion, determines necessary to adjust loan stocks to 
the reserve stock level.
    Section 319(c)(3)(C) further provides that, with respect to the 
1995 and 1996 marketing years, any reduction in the national marketing 
quota being determined shall not exceed 10 percent of the previous 
year's national marketing quota. However, if actual loan stocks exceed 
the prescribed reserve stock level by 50 percent the reduction limit 
could be waived and the Secretary could then set the quota according to 
the three-component formula (plus or minus 3 percent). The reserve 
stock level is defined in section 301(b)(14)(D) of the 1938 Act as the 
greater of 50 million pounds or 15 percent of the national marketing 
quota for burley tobacco for the marketing year immediately preceding 
the marketing year for which the level is being determined.
    Section 320A of the 1938 Act provides that all domestic 
manufacturers of cigarettes with more than 1 percent of U.S. cigarette 
production and sales shall submit to the Secretary a statement of 
purchase intentions for the 1996 crop of burley tobacco by January 15, 
1996. Five such manufacturers were required to submit such a statement 
for the 1996 crop and the total of their intended purchases for the 
1996 crop is 424.0 million pounds. The 3-year average of exports is 
155.4 million pounds.
    The national marketing quota for the 1995 crop year was 549.0 
million pounds (60 FR 27867). Thus, in accordance with section 301 
(b)(14)(D), the reserve stock level for use in determining the 1996 
marketing quota for burley tobacco is 82.4 million pounds.
    As of January 26, 1996, the Burley Tobacco Growers Cooperative 
Association and Burley Stabilization Corporation had in their 
inventories 28.0 million pounds of burley tobacco (excluding pre-1994 
stocks committed to be purchased by manufacturers and covered by 
deferred sales). Accordingly, the adjustment necessary to maintain loan 
stocks at the reserve supply level is an increase of 54.4 million 
pounds.
    The total of the three marketing quota components for the 1996-97 
marketing year is 633.8 million pounds. USDA did not use its 
discretionary authority to increase or decrease the three-component 
total by up to 3 percent because the Secretary determined that the 
1996/97 supply would be more than ample at the formula level. 
Accordingly, the national marketing quota for the marketing year 
beginning October 1, 1996, for burley tobacco is 633.8 million pounds.
    In accordance with section 319(c) of the 1938 Act, the Secretary is 
authorized to establish a national reserve from the national quota in 
an amount equivalent to not more than 1 percent of the national quota 
for the purpose of making corrections in farm quotas to adjust for 
inequities and establish quotas for new farms. The Secretary has 
determined that a national reserve for the 1996 crop of burley tobacco 
of 2,429,000 pounds is adequate for these purposes.

Price Support

    Price support is required to be made available for each crop of a 
kind of tobacco for which quotas are in effect, or for which marketing 
quotas have not been disapproved by producers, at a level determined in 
accordance with a formula prescribed in section 106 of the 1949 Act.
    With respect to the 1996 crop of burley tobacco, the level of 
support is determined in accordance with sections 106 (d) and (f) of 
the 1949 Act. Section 106(f)(7)(A) of the 1949 Act provides that the 
level of support for the 1996 crop of burley tobacco shall be:
    (1) The level, in cents per pound, at which the 1995 crop of burley 
tobacco was supported, plus or minus, respectively,
    (2) An adjustment of not less than 65 percent nor more than 100 
percent of the total, as determined by the Secretary after taking into 
consideration the supply of the kind of tobacco involved in relation to 
demand, of:
    (A) 66.7 percent of the amount by which:
    (I) The average price received by producers for burley tobacco on 
the United States auction markets, as

[[Page 50425]]

determined by the Secretary, during the 5 marketing years immediately 
preceding the marketing year for which the determination is being made, 
excluding the year in which the average price was the highest and the 
year in which the average price was the lowest in such period, is 
greater or less than:
    (II) The average price received by producers for burley tobacco on 
the United States auction markets, as determined by the Secretary, 
during the 5 marketing years immediately preceding the marketing year 
prior to the marketing year for which the determination is being made, 
excluding the year in which the average price was the highest and the 
year in which the average price was the lowest in such period; and
    (B) 33.3 percent of the change, expressed as a cost per pound of 
tobacco, in the index of prices paid by the tobacco producers from 
January 1 to December 31 of the calendar year immediately preceding the 
year in which the determination is made.
    The difference between the two 5-year averages (i.e., the 
difference between (A) (I) and (II)) is 1.8 cents per pound. The 
difference in the cost index from January 1 to December 31, 1995, is 
1.8 cents per pound. Applying these components to the price support 
formula (1.8 cents per pound, two-thirds weight; 1.8 cents per pound, 
one-third weight) results in a weighted total of 1.8 cents per pound. 
As indicated, section 106 provides that the Secretary may, on the basis 
of supply and demand conditions, limit the change in the price support 
level to no less than 65 percent of that amount. In order to remain 
competitive in foreign and domestic markets, the Secretary used his 
discretion to limit the increase to 65 percent of the maximum allowable 
increase. Accordingly, the 1996 crop of burley tobacco will be 
supported at 173.7 cents per pound, 1.2 cents higher than in 1995.

List of Subjects

7 CFR Part 723

    Acreage allotments, marketing quotas, penalties, reporting and 
recordkeeping requirements, tobacco.

7 CFR Part 1464

    Loan programs--agriculture, price support programs, tobacco, 
reporting and recordkeeping requirements, warehouses.

    Accordingly, 7 CFR parts 723 and 1464 are amended as follows:

PART 723--TOBACCO

    1. The authority citation for 7 CFR part 723 continues to read as 
follows:

    Authority: 7 U.S.C. 1301, 1311-1314, 1314-1, 1314b, 1314b-1, 
1314b-2, 1314c, 1314d, 1314e, 1314f, 1314i, 1315, 1316, 1362, 1363, 
1372-75, 1421, 1445-1, and 1445-2.

    2. Section 723.112 is amended by adding paragraph (d) to read as 
follows:

Sec. 723.112  Burley (type 31) tobacco.

* * * * *
    (d) The 1996 crop national marketing quota is 633.8 million pounds.

PART 1464--TOBACCO

    3. The authority citation for 7 CFR part 1464 continues to read as 
follows:

    Authority: 7 U.S.C. 1421, 1423, 1441, 1445, 1445-1 and 1445-2; 
15 U.S.C. 714b and 714c.

    4. Section 1464.19 is amended by adding paragraph (d) to read as 
follows:

Sec. 1464.19  Burley (type 31) tobacco.

* * * * *
    (d) The 1996 crop national price support level is 173.7 cents per 
pound.

    Signed at Washington, DC, on September 17, 1996.
Bruce R. Weber,
Administrator, Farm Service Agency and Executive Vice President, 
Commodity Credit Corporation.
[FR Doc. 96-24669 Filed 9-25-96; 8:45 am]
BILLING CODE 3410-05-P

Complete official Federal Register PDF

FR Doc. 96-24663 Regulations Issued Under the Export Apple and Pear Act; Relaxation of Grade Requirements for Apples and Pears Shipped to Pacific Ports of Russia
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50421-50423]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24663]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 188 / Thursday, September 26, 1996 / 
Rules and Regulations

[[Page 50421]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 33

[Docket No. FV-96-33-1 IFR]

Regulations Issued Under the Export Apple and Pear Act; 
Relaxation of Grade Requirements for Apples and Pears Shipped to 
Pacific Ports of Russia

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Interim final rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: This document relaxes the minimum grade requirements issued 
under the Export Apple and Pear Act for U.S.-grown apples and pears 
shipped to Pacific ports of Russia. Container marking provisions also 
are relaxed for such shipments. These changes are designed to develop 
Eastern Russia as an export market for apples and pears. This rule was 
recommended by the Northwest Horticultural Council (Council), an 
organization representing the Northwest fruit industry.

DATES: Effective September 27, 1996. Comments must be received by 
October 28, 1996.

ADDRESSES: Interested persons are invited to submit written comments 
concerning this rule. Comments must be sent in triplicate to the Docket 
Clerk, Fruit and Vegetable Division, AMS, USDA, Room 2525-S, PO Box 
96456, Washington, DC 20090-6456, Fax # (202) 720-5698. All comments 
should reference the docket number and the date and page number of this 
issue of the Federal Register and will be made available for public 
inspection in the Office of the Docket Clerk during regular business 
hours.

FOR FURTHER INFORMATION CONTACT: Dennis L. West, Marketing Specialist, 
Northwest Marketing Field Office, Marketing Order Administration 
Branch, Fruit and Vegetable Division, AMS, USDA, 1220 SW Third Avenue, 
room 369, Portland, Oregon 97204-2807; telephone: (503) 326-2724, Fax # 
(503) 326-7440; or William R. Addington, Marketing Specialist, 
Marketing Order Administration Branch, Fruit and Vegetable Division, 
AMS, USDA, PO Box 96456, room 2523-S, Washington, DC 20090-6456; 
telephone: (202) 720-2412, Fax # (202) 720-5698. Small businesses may 
request information on compliance with this regulation by contacting: 
Jay Guerber, Marketing Order Administration Branch, Fruit and Vegetable 
Division, AMS, USDA, PO Box 96456, room 2523-S, Washington, DC 20090-
6456; telephone: (202) 720-2491, Fax # (202) 720-5698.

SUPPLEMENTARY INFORMATION: This interim final rule is issued under 
authority of the Export Apple and Pear Act, as amended, (7 U.S.C. 581-
590), hereinafter referred to as the ``Act.'' This rule will amend 
``Regulations Issued Under Authority of the Export Apple and Pear Act'' 
(7 CFR part 33).
    The Department of Agriculture (Department) is issuing this rule in 
conformance with Executive Order 12866.
    This rule has been reviewed under Executive Order 12988, Civil 
Justice Reform. This rule is not intended to have retroactive effect. 
This rule will not preempt any State or local laws, regulations, or 
policies, unless they present an irreconcilable conflict with this 
rule. There are no administrative procedures which must be exhausted 
prior to any judicial challenge to the provisions of this rule.
    Pursuant to requirements set forth in the Regulatory Flexibility 
Act (RFA), the Agricultural Marketing Service (AMS) has considered the 
economic impact of this action on small entities. The purpose of the 
RFA is to fit regulatory actions to the scale of business subject to 
such actions in order that small businesses will not be unduly or 
disproportionately burdened.
    The Act and regulations effective thereunder apply to exporters and 
export carriers of apples and pears. In the United States, there are 
approximately 450 firms which pack and export apples and 300 firms 
which pack and export pears that are potentially subject to regulations 
under the authority of the Act. Small agricultural service firms, which 
include firms that pack and export apples and pears, have been defined 
by the Small Business Administration (13 CFR 121.601) as those having 
annual receipts of less than $5,000,000. The majority of apple and pear 
exporters regulated under the Act may be classified as small entities. 
This interim final rule invites comments on changes to the regulations 
currently issued under the Act. This rule relaxes the minimum grade 
requirements issued under the Act for U.S.-grown apples and pears only 
shipped to Pacific ports of Russia. Container marking provisions also 
are relaxed for such shipments. This rule will provide all exporters 
additional flexibility in marketing apples and pears of different 
grades and quality in Russian port cities and areas along the Pacific 
Ocean. These changes are designed to develop export markets for apples 
and pears in these areas. This rule does not preclude shipments of 
apples and pears of higher than the minimum quality from being shipped 
to Russian Pacific ports. This should benefit both large and small 
exporters of apples and pears. Therefore, the AMS has determined that 
this action will not have a significant economic impact on a 
substantial number of small entities. Interested persons are invited to 
submit information on the regulatory and informational impacts of this 
action on small businesses.
    Section 33.10 of the ``Regulations Issued Under Authority of the 
Export Apple and Pear Act'' establishes minimum grade and container 
marking requirements for export shipments of apples and pears. 
Currently, export shipments of apples must meet a minimum grade of U.S. 
No. 1 or U.S. No. 1 Early as specified in the United States Standards 
for Apples (7 CFR part 51, Secs. 51.300-51.323). Exports of summer and 
fall pears must meet a minimum grade of U.S. No. 2 as specified in the 
United States Standards for Summer and Fall Pears (7 CFR part 51, 
Secs. 51.1260-51.1280). Exports of winter pears also must meet the 
minimum grade of U.S. No. 2 as specified in the United States Standards 
for Winter Pears (7 CFR part 51, Secs. 51.1300-51.1323). Additional 
restrictions for apple maggot and San Jose scale apply to both apples 
and pears.

[[Page 50422]]

    This rule reduces the minimum grade requirements as follows.
    The minimum grade for fresh apples exported to Russian Pacific 
ports is reduced to U.S. Utility grade (7 CFR part 51, Sec. 51.303) or 
U.S. No. 1 Hail (7 CFR part 51, Sec. 51.302(b)) for apples damaged by 
hail.
    The minimum requirements for summer and fall pears exported to 
Russian Pacific ports are listed in the regulatory text of this 
regulation. The requirements provide that the pears should be of one 
variety that are mature, hand picked, clean, sound and free from hard-
end; and free from serious damage caused by broken skin, insects, 
disease, hail marks, limbrubs, heavy russet, or other means; and shall 
not be so excessively elongated or flattened as to preclude the cutting 
of one good half. The requirements also include necessary definitions 
and explanations of some provisions and a list of tolerances which are 
applied to each lot at the time of packing.
    Finally, the minimum requirements for winter pears exported to 
Russian Pacific ports also are listed in the regulatory text of this 
regulation. The requirements provide that the pears be of one variety 
which are mature, hand picked, clean, sound, not very seriously 
misshapen, free from black end, free from damage caused by hard end, 
broken skins, and free from serious damage caused by cork spot or 
bruises. ``Very seriously misshapen'' means that the pear is 
excessively flattened, elongated for the variety, or is constricted or 
deformed so it will not cut one good half or two fairly uniform 
quarters. The requirements also include necessary definitions and 
explanations of some provisions and a list of tolerances which are 
applied to each lot at the time of packing.
    Handlers may ship apples and pears of higher grade quality than the 
minimum requirements established in this regulation.
    Paragraph (d)(3) of Sec. 33.10 Minimum requirements of the 
implementing regulations provides that each package of apples and pears 
be marked plainly and conspicuously with the name of the U.S. grade or 
the name of a State grade applicable to the product being exported. 
However, the new minimum requirement for pears is not equivalent to a 
U.S. grade, as required by paragraph (d)(3) and, thus, cannot be marked 
on containers. Therefore the Department has determined that the marking 
requirements of paragraph (d)(3) should not apply to shipments of pears 
shipped to Pacific ports of Russia meeting minimum quality 
requirements. This regulation adds a proviso to paragraph (d)(3). 
Apples shipped according to the minimum grade standard in this 
regulation are not exempt from the grade marking provisions and must be 
properly marked pursuant to paragraph (d).
    The additional restrictions for apple maggot and San Jose scale 
continue to apply to apples and pears shipped to any foreign 
destination.
    The Council, an organization that represents a substantial portion 
of the fruit industry in the Northwest States of Oregon, Washington, 
and Idaho, recommended these changes in the current export regulations.
    The Council advises that a change in requirements is needed to 
develop export markets for apples and pears to Pacific ports of Russia. 
According to the Council, exporters indicate that there is a demand in 
this relatively new export market of Eastern Russia for apples and 
pears of a lower grade than the current requirements allow. This change 
is expected to increase sales opportunities in a market willing to 
accept apples and pears that are lower in overall quality and less 
uniform in appearance than most export markets will accept.
    The Council reports that weather and growing conditions are 
expected to adversely affect the appearance and quality of a 
significant portion of the 1996 pear crop. The Council believes this 
change will facilitate market development efforts for apples and pears 
to Pacific ports of Russia. Apples and pears which are not shipped for 
fresh consumption in either domestic or foreign markets are usually 
disposed of in processing outlets, such as juice. Processing outlets 
are not normally as profitable as fresh market outlets.
    The Council and other industry groups conduct periodic meetings and 
consider recommendations for modification, suspension, or termination 
of the regulatory requirements under the Act. These meetings are open 
to the public, and interested persons are given an opportunity to 
express their views. The Department reviews recommendations and 
information submitted by these and other industry groups as well as 
other available information and determines whether such modification, 
suspension, or termination of the regulatory requirements would tend to 
effectuate the purposes of the Act.
    After consideration of all relevant material presented, including 
the Council's recommendation, and other available information, it is 
found that this interim final rule, as hereinafter set forth, will tend 
to effectuate the declared policy of the Act.
    Pursuant to 5 U.S.C. 553, it is also found and determined upon good 
cause that it is impracticable, unnecessary, and contrary to the public 
interest to give preliminary notice prior to putting this rule into 
effect and that good cause exists for not postponing the effective date 
of the rule until 30 days after publication in the Federal Register 
because: (1) This rule relaxes the current grade requirements for 
apples and pears shipped to Pacific ports of Russia; (2) exporters have 
indicated that sales opportunities exist in Eastern Russia and that 
they would like to take advantage of these opportunities as soon as 
possible; (3) apples and pears are shipped throughout the year, and 
this rule should be in effect promptly so exporters can make marketing 
plans; and (4) this rule provides a 30-day comment period and any 
comments received will be considered prior to finalization of this 
rule.

List of Subjects in 7 CFR Part 33

    Administrative practice and procedure, Exports, Apples, Pears, 
Reporting and recordkeeping requirements.

    For the reasons set forth in the preamble, 7 CFR part 33 is amended 
as follows:

PART 33--EXPORT APPLES AND PEARS

    1. The authority citation for 7 CFR part 33 continues to read as 
follows:

    Authority: Sec. 7, 48 Stat. 124; 7 U.S.C. 587.

    2. In Sec. 33.10, paragraph (a), (b), and (d) are revised to read 
as follows:

Sec. 33.10  Minimum requirements.

* * * * *
    (a) Apples grade at least U.S. No. 1 or U.S. No. 1 Early: Provided, 
That apples for export to Pacific ports of Russia shall grade at least 
U.S. Utility or U.S. No. 1 Hail for hail-damaged apples, as specified 
in the United States Standards for Apples (Secs. 51.300-51.323 of this 
chapter): Provided further, That apples for export to any foreign 
destination do not contain apple maggot, and do not have more than 2 
percent, by count, of apples with apple maggot injury, nor more than 2 
percent, by count, of apples infested with San Jose scale or scale of 
similar appearance;
    (b) Pears grade at least U.S. No. 2 as specified in the United 
States Standards for Summer and Fall Pears, such as Bartlett, Hardy, 
and other similar varieties (Secs. 51.1260-51.1280 of this chapter), or 
in the United States Standards for Winter Pears, such as Anjou, Bosc, 
Comice, and other similar

[[Page 50423]]

varieties (Secs. 51.1300-51.1323 of this chapter), do not contain apple 
maggot, and do not have more than 2 percent, by count, of apples with 
apple maggot injury, nor more than 2 percent, by count, of apples 
infested with San Jose scale or scale of similar appearance: Provided, 
That the minimum quality requirements for pears exported to Pacific 
ports of Russia are as follows:
    (1) Summer and fall pears shall be of one variety which are mature, 
hand picked, clean, sound and free from hard-end; and free from serious 
damage caused by broken skin, insects, disease, hail marks, limbrubs, 
heavy russet, or other means; and shall not be so excessively elongated 
or flattened as to preclude the cutting of one good half. Broken skin 
must not exceed 1/4 inch in diameter. The following definitions shall 
apply to all varieties:
    Clean means reasonably free from dust, dirt, or honey dew.
    Free from serious damage means defects when taken singly or 
collectively shall not seriously affect the edible or culinary value of 
the fruit.
    Hand picked means that pears do not show evidence of rough handling 
or of having been on the ground.
    Hard-end means pears which show an abnormally yellow or green color 
at the blossom end or an abnormally smooth rounded base with little or 
no depression at the calyx, or if the flesh near the calyx is 
abnormally dry and tough or woody. Pears affected by hard-end shall be 
considered defects. Rat-tail shaped pears, or second bloom pears that 
are tough or ridged shall be considered defects. At the time of 
packing, not more than 10 percent, by count, of any lot may be below 
the requirements of the grade, and not more than one-tenth of this 
amount shall be allowed for decay and/or breakdown. Slight 
imperfections which are not discernible in good commercial sorting 
practice shall not be considered as defects. Small inconspicuous skin 
breaks of less than 1/8 inch in diameter or depth shall not be 
considered as damage, and not more than 15 percent of the pears in any 
container may have not more than one skin break from 1/8 inch to 3/16 
inch, inclusive, in diameter or depth. After pears have been placed in 
storage, or in transit; scald, breakdown, decay, bitter pit, or 
physical injury affecting keeping quality, which may have developed or 
may only have become evident after pears are packed, are defined as 
applying to condition rather than to grade. Pears also shall not 
contain apple maggot, and shall not have more than 2 percent, by count, 
of pears with apple maggot injury, nor more than 2 percent, by count, 
of pears infested with San Jose scale or scale of similar appearance;
    Mature means having reached the stage of maturity which will insure 
a proper completion of the ripening process. Firmness of the flesh 
shall be considered only in connection with other factors to determine 
the degree of maturity. Sound means that pears at time of packing are 
free from visible defects such as decay, breakdown, scald, bitter pit, 
or physical injury affecting keeping quality. The following conditions 
shall not be considered serious damage: healed insect depressions or 
other surface blemishes which do not prevent the cutting of one good 
half;
    (2) Winter pears shall be of one variety which are mature, hand 
picked, clean, sound, not very seriously misshapen, free from black 
end, free from damage caused by hard end, broken skins, and from 
serious damage caused by cork spot or bruises. The following 
definitions shall apply to all varieties:
    Black end is evidenced by an abnormally deep green color around the 
calyx, or black spots usually occurring on one-third of the surface 
nearest to the calyx, or by an abnormally shallow calyx cavity.
    Clean means free from excessive dirt, dust, spray residue, or other 
foreign material.
    Damage by hard end means any injury or defect which materially 
affects the appearance, edible or shipping quality. Any pear with one 
skin break larger than \3/16\ inch in diameter or depth, or with more 
than one skin break \1/8\ inch or larger in diameter or depth, shall be 
considered damaged, and scored against the grade tolerance.
    Handpicked means that the pears do not show evidence of having been 
on the ground.
    Hard end is an abnormal yellow color at the blossom end, or an 
abnormally smooth, rounded base with little or no depression at the 
calyx, or if the flesh near the calyx is abnormally dry and tough or 
woody.
    Mature means that the pear has reached the stage of maturity which 
will insure the proper completion of the ripening process.
    Overripe means dead ripe, very mealy or soft, past commercial 
utility.
    Serious damage by cork spot is when more than two cork spots are 
visible externally, or when the visible external injury affects an 
aggregate area of more than \1/2\ inch in diameter. Serious damage by 
bruising is bruising which seriously affects the appearance, edible or 
shipping quality. For a tolerance of 10 percent or more, individual 
packages in any lot may contain not more than one and one-half times 
the tolerance specified, except that when the package contains 15 
specimens or less, individual packages may contain not more than double 
the tolerance specified. For a tolerance of less than 10 percent, 
individual packages in any lot may contain not more than double the 
tolerance specified, provided at least one specimen which does not meet 
the requirements shall be allowed in any one package. Pears also shall 
not contain apple maggot, and shall not have more than 2 percent, by 
count, of pears with apple maggot injury, nor more than 2 percent, by 
count, of pears infested with San Jose scale or scale of similar 
appearance;
* * * * *
    (d) Each package of apples or pears is marked plainly and 
conspicuously with:
    (1) the name and address of the grower, packer, or domestic 
distributor: Provided, That the name of the foreign distributor may be 
placed on consumer unit packages shipped in a master container if such 
master container is marked with the name and address of the grower, 
packer, or domestic distributor;
    (2) the variety of the apples or pears;
    (3) the name of the U.S. grade or the name of a state grade if the 
fruit meets each minimum requirement of a U.S. grade specified in this 
section; and Provided further, That the marking requirements of this 
paragraph shall not apply to pears meeting minimum quality requirements 
of this section and shipped to Pacific ports of Russia.

    Dated: September 20, 1996.
Robert C. Keeney,
Director, Fruit and Vegetable Division.
[FR Doc. 96-24663 Filed 9-25-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-24642 Amendment of Class E Airspace; Prescott, AZ
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50426-50427]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24642]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 71

[Airspace Docket No. 96-AWP-17]

Amendment of Class E Airspace; Prescott, AZ

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action amends the Class E airspace area at Prescott, AZ. 
The development of a Global Positioning System (GPS) Standard 
Instrument Approach Procedure (SIAP) to Runways (RWYs) 12/21L has made 
this action necessary. The intended effect of this action is to provide 
adequate controlled airspace for Instrument Flight Rules (IFR) 
operations at Ernest A. Love Field, Prescott, AZ.

EFFECTIVE DATE: 0901 UTC December 5, 1996.

FOR FURTHER INFORMATION CONTACT:
William Buck, Airspace Specialist, Operations Branch, AWP-530, Air 
Traffic Division, Western-Pacific Region, Federal Aviation 
Administration, 15000 Aviation Boulevard, Lawndale, California 90261, 
telephone (310) 725-6556.

SUPPLEMENTARY INFORMATION: 

History

    On July 29, 1996, the FAA proposed to amend part 71 of the Federal 
Aviation Regulations (14 CFR part 71) by amending the Class E airspace 
area at Prescott, AZ (61 FR 39369). This action will provide adequate 
controlled airspace to accommodate a GPS SIAP to RWYs 12/21L at Ernest 
A. Love Field, Prescott, AZ.
    Interested parties were invited to participate in this rulemaking 
proceeding by submitting written comments on the proposal to the FAA. 
No comments to the proposal were received. Class E airspace 
designations are published in paragraph 6005 of FAA Order 7400.9D dated 
September 4, 1996, and effective September 16, 1996, which is 
incorporated by reference in 14 CFR 71.1. The Class E airspace 
designations listed in this document will be published subsequently in 
this Order.

The Rule

    This amendment to part 71 of the Federal Aviation Regulations (14 
CFR part 71) amends the Class E airspace area at Prescott, AZ. The 
development of a GPS SIAP to RWYs 12/21L has made this action 
necessary. The effect of this action will provide adequate airspace for 
aircraft executing the GPS RWYs 12/21L SIAP at Ernest A. Love Field, 
Prescott, AZ.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this regulation--(1) is not a ``significant regulation 
action'' under Executive Order 12866; (2) is not a ``significant rule'' 
under DOT Regulatory Policies and Procedures (44 FR 10034; February 26, 
1979); an (3) does not warrant preparation of a Regulatory Evaluation 
as the anticipated impact is so minimal. Since this is a routine matter 
that will only affect air traffic procedures and air navigation, it is 
certified that this rule will not have a significant economic impact on 
a substantial number of small entities under the criteria of the 
Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air)

Adoption of the Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration amends 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR part 71 continues to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9D, Airspace Designations and 
Reporting Points, dated September 4, 1996, and effective

[[Page 50427]]

September 16, 1996, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet or more above the surface of the earth.

* * * * *

AWP AZ E5 Prescott, AZ [Revised]

Ernest A. Love Field, AZ
    (Lat. 34 deg.39'06'' N, long. 112 deg.25'18'' W)
Drake VORTAC
    (Lat. 34 deg.42'09'' N, long. 112 deg.28'49'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6-mile radius of the Ernest A. Love Field and within 2.6 
miles each side of Drake VORTAC 318 deg. radial extending from the 
6-mile radius to 7.5 miles northwest of the Drake VORTAC and within 
4.3 miles northwest and 3 miles southeast of the Runway 21 localizer 
extending from the 6-mile radius to 8.7 miles northeast of Earnest 
A. Love Field. That airspace extending upward from 1,200 feet above 
the surface within a 18.2-mile radius of the Drake VORTAC, extending 
clockwise from a line 4.3 miles south of and parallel to the Drake 
VORTAC 252 deg. radial to a line 4 miles northwest of and parallel 
to Drake VORTAC 318 deg. radial and within a 24-mile radius of the 
Drake VORTAC, extending clockwise from a line 4 miles northeast of 
and parallel to the Drake VORTAC 318 deg. radial to a line 4 miles 
west of and parallel to the Drake VORTAC 003 deg. radial and with a 
18.2-mile radius of Drake VORTAC, extending clockwise from a line 4 
miles west of and parallel to the Drake VORTAC 003 deg. radial to a 
line 4.3 miles west of and parallel to the Drake VORTAC 159 deg. 
radial and within a 12.2-mile radius of Drake VORTAC, extending 
clockwise from a line 4.3 miles west of and parallel to the Drake 
VORTAC 159 deg. radial to a line 4.3 miles south of and parallel to 
the Drake VORTAC 252 deg. radial.
* * * * *
    Issued in Los Angeles, California, on September 12, 1996.
Leonard A. Mobley,
Acting Manager, Air Traffic Division, Western-Pacific Region.
[FR Doc. 96-24642 Filed 9-25-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-24641 Special Local Regulations for Marine Events; 18th Annual Wilmington Family YMCA-PHP Triathlon, Wrightsville Channel, Wrightsville Beach, NC
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Page 50436]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24641]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 100

[CGD 05-96-042]
RIN 2115-AA97

Special Local Regulations for Marine Events; 18th Annual 
Wilmington Family YMCA-PHP Triathlon, Wrightsville Channel, 
Wrightsville Beach, NC

AGENCY: Coast Guard, DOT.

ACTION: Notice of implementation.

-----------------------------------------------------------------------

SUMMARY: This notice implements the regulations for the swim portion of 
the 18th Annual Wilmington YMCA-Physicians Health Plan Triathlon, to be 
held in Wrightsville Channel between daybeacon 18 (LLNR 28050) and 
daybeacon 23 (LLNR 28065). These Special Local Regulations are needed 
to control vessel traffic within the immediate vicinity of the event 
due to the confined nature of the waterway. The effect will be to 
restrict vessel traffic within the regulated area for the safety of the 
participants in the event.

EFFECTIVE DATES: 33 CFR 100.513 is effective from 6 a.m. to 9:45 a.m., 
September 29, 1996.

FOR FURTHER INFORMATION CONTACT:
QMC C. Bush, marine events coordinator, Commander, Coast Guard Group 
Fort Macon, PO Box 237, Atlantic Beach, NC 28512-0237, (919) 247-4554.

DISCUSSION OF REGULATIONS: The Wilmington Family YMCA will hold the 
swim portion of the 18th Annual Wilmington Family YMCA-Physicians 
Health Plan Triathlon at Wrightsville Beach, North Carolina. The event 
will consist of approximately 700 swimmers racing in a section of 
Wrightsville Channel between Wrightsville Channel daybeacon 18 (LLNR 
28050) and Wrightsville Channel daybeacon 23 (LLNR 28065). Therefore, 
to ensure the safety of the swimmers, 33 CFR 100.513 will be in effect 
for the duration of the event. Under provisions of 33 CFR 100.513, a 
vessel may not enter the area between daybeacons 14 and 25 without 
permission from the Coast Guard patrol commander. Since the waterway 
will not be closed for an extended period, commercial traffic should 
not be severely disrupted.

    Dated: June 24, 1996.
Kent H. Williams,
Vice Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.
[FR Doc. 96-24641 Filed 9-25-96; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 96-24602 Withdrawal of Pesticide Tolerance Revocations
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50684-50685]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24602]

      

[[Page 50683]]

_______________________________________________________________________

Part IX

Environmental Protection Agency

_______________________________________________________________________

40 CFR Part 180, et al.

Withdrawal of Pesticide Tolerance Revocations; Final Rule and Proposed 
Rule

Federal Register / Vol. 61, No. 188 / Thursday, September 26, 1996 / 
Rules and Regulations

[[Page 50684]]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 185

[OPP-300438; FRL-5397-4]
RIN 2070-AC55

Withdrawal of Pesticide Tolerance Revocations

AGENCY: Environmental Protection Agency (EPA).

ACTION: Rule.

-----------------------------------------------------------------------

SUMMARY: EPA is withdrawing final rules revoking 17 processed food 
tolerances. The Agency is withdrawing these revocations because they 
were based on two provisions of the Federal Food, Drug and Cosmetic Act 
that no longer are applicable to pesticide residues in food, 
specifically the Delaney clause and the ``ready-to-eat'' provision. 
Since the enactment of the Food Quality Protection Act, the basis for 
these revocations no longer exists as a matter of law. Accordingly, EPA 
is withdrawing these final rules.

EFFECTIVE DATE: This rule is effective September 26, 1996.

FOR FURTHER INFORMATION CONTACT: By mail: Niloufar Nazmi-Glosson, 
Special Review Branch, (7508W), Environmental Protection Agency, 401 M 
St., SW., Washington, DC 20460; telephone number: (703) 308-8028. e-
mail: [email protected].

SUPPLEMENTARY INFORMATION:

I. Statutory Background

    The Federal Food, Drug and Cosmetic Act (FFDCA) (21 U.S.C. 301 et 
seq.) authorizes the establishment of maximum permissible levels of 
pesticides in foods, which are referred to as ``tolerances'' (21 U.S.C. 
346a). Without such a tolerance or an exemption from a tolerance, a 
food containing a pesticide residue is ``adulterated'' under section 
402 of the FFDCA and may not be legally moved in interstate commerce 
(21 U.S.C. 342). Monitoring and enforcement of pesticide residues are 
carried out by the U.S. Food and Drug Administration and the U.S. 
Department of Agriculture.
    The FFDCA's provisions governing pesticides were significantly 
amended on August 3, 1996 by the enactment of the Food Quality 
Protection Act of 1996 (FQPA) (Pub. L. 104-170, 110 Stat. 1489). The 
FQPA amendments were effective immediately.
    Among other things, the FQPA amends the FFDCA to bring all EPA 
pesticide tolerance-setting activities under a single section of the 
statute -- section 408 -- and added a new safety standard and new 
procedures in that section. Previously, regulatory authority over 
pesticides in the FFDCA had been divided between sections 408 and 409. 
The division of pesticides between sections 408 and 409 had been the 
subject of some controversy because of the differing safety standards 
in the two sections. Of particular significance was the inclusion in 
section 409, but not section 408, of the Delaney anti-cancer clause. 
The FQPA converted all existing section 409 tolerances for pesticide 
residues in processed food into section 408 tolerances. 21 U.S.C. 
346a(j).
    The FQPA also amended the so-called ``flow-through'' provision in 
section 402(a)(2) that governed whether tolerances for pesticide 
residues in raw agricultural commodities apply to pesticide residues in 
processed foods. Before being amended, the FFDCA had specified that a 
pesticide residue in a processed food would not render that food 
adulterated if, among other things, the level of the residue in the 
processed food ``when ready to eat'' is below the tolerance level for 
the pesticide in the precursor raw agricultural commodity. The FQPA 
maintained this flow-through concept that raw agricultural commodity 
tolerances would apply to pesticides in processed food but modified 
existing law by dropping the requirement that the level of residue in 
the processed food be evaluated at the ready-to-eat stage. 21 U.S.C. 
346a(a)(2)(A).

II. Regulatory Background

    In response to the decision in Les v. Reilly, 968 F.2d 985 (9th 
Cir.), cert. denied, 113 S.Ct. 1361 (1993), in which the U.S. Court of 
Appeals, Ninth Circuit held there was no de minimis exception to the 
Delaney clause, EPA began to initiate revocation actions against those 
existing section 409 tolerances which were inconsistent with the 
Delaney clause.
    Further, on February 9, 1995, EPA entered into a court-approved 
consent decree in which EPA agreed to a timetable for deciding whether 
to revoke an extensive list of section 408 and 409 tolerances. Under 
the consent decree, EPA has taken a number of revocation actions. In 
the case of final revocations, many tolerances remain in effect because 
either EPA has delayed the effective date to allow for the filing of 
objections and hearing requests and to consider stay requests or EPA or 
a court has granted requests for stays of the effective date of 
revocation.

III. Today's Action

    EPA is today withdrawing a total of 17 revocations issued in 5 
separate actions. The tables in Unit IV of this notice list the 
specific tolerance revocations in those five actions that are being 
withdrawn. Revocations in those actions not listed in the table are not 
affected.
    1. Benomyl on tomato products and raisins.  This final revocation 
of section 409 tolerances (June 30, 1994, 59 FR 33685; July 14, 1993, 
58 FR 37862) was stayed by the D.C. Court of Appeals and the Agency 
reinstated the tolerances on September 12, 1994 (59 FR 46769). EPA is 
withdrawing the revocations of the tolerances on tomato products and 
raisins. Because EPA's reinstatement rule restablished the tomato 
products and raisin tolerances in full force, no amendment to the Code 
of Federal Regulations is ncessary inconjunction with the withdrawal of 
these revocations.
    2. Dichlorvos in bagged and packaged processed foods. This final 
revocation of the section 409 tolerance (November 10, 1993, 58 FR 
59663) was stayed by EPA on March 11, 1994 (59 FR 11556). EPA styled 
this revocation as a revision to the tolerance because the revocation 
had a delayed effective date. EPA is withdrawing that revision.
    3. Dicofol on dried tea. This final revocation of the section 409 
tolerance for dicofol (March 9, 1994, 59 FR 10993) was stayed by EPA on 
May 9, 1994 (59 FR 23799). EPA is withdrawing this revocation.
    4. March 1996 revocations. This group consists of final revocations 
of 26 section 409 tolerances for 7 pesticides (March 22, 1996, 61 FR 
11993)(FRL-5357-7). The revocations of 8 tolerances were stayed by EPA 
(May 20, 1996, 61 FR 22153). The remaining revocations became effective 
on May 21, 1996. EPA is today withdrawing the revocations of the 8 
tolerances for which stays were granted.
    5. July 1996 revocations. This group consists of final revocations 
of six section 409 tolerances and three section 408 tolerances for four 
pesticides (July 29, 1996, 61 FR 39527)(FRL-5388-2). These revocations 
are not yet effective. EPA is today withdrawing the revocations of five 
section 409 tolerances. The revocations of the remaining section 409 
tolerance and the section 408 tolerances will become effective on 
October 28, 1996.
    EPA is withdrawing 16 of the 17 revocations because they were based 
on the Delaney clause in section 409. Under the modified FFDCA, 
pesticide residues are no longer governed by

[[Page 50685]]

section 409 or its Delaney clause and all of the section 409 tolerances 
which were still in effect on August 3, 1996 were converted to section 
408 tolerances. A section 408 processed food tolerance cannot be 
revoked on the basis of the Delaney clause in section 409 and thus all 
pending revocations premised solely on the Delaney clause are being 
withdrawn as lacking any legal basis.
    EPA is withdrawing one revocation (imazalil/citrus oil) because it 
was based on EPA's conclusion that the tolerance in question is set on 
a not ready-to-eat food. EPA had reasoned that once the dilution 
associated with final processing of the ready-to-eat food is taken into 
account the ready-to-eat food is unlikely to contain residues above the 
tolerance for the precursor raw commodity and hence no section 409 
tolerance is necessary to prevent the processed food from being deemed 
adulterated. Because the FQPA removed the ready-to-eat factor from the 
flow-through provision governing the applicability of raw agricultural 
commodity tolerances to processed foods, revocations relying on the 
dilution which occurs in processing a ready-to-eat food have no basis 
in law and are therefore being withdrawn.
    In withdrawing these actions, EPA would like to make clear two 
points. First, because these revocations concerned legal requirements 
no longer applying to pesticides, EPA will not assert a preclusive 
effect as to any factual findings regarding such requirements. Second, 
today's action should not be interpreted to mean that EPA has made a 
``safety finding'' as to the pesticide tolerances in question under the 
FFDCA, as amended by the FQPA. EPA will systematically review the 
safety of all the tolerances within the next 10 years, as required 
under the FQPA.

IV. Specific Revocations Being Withdrawn

    The specific actions EPA is withdrawing are presented in the two 
tables below.
    Table 1 lists section 409 tolerances for which final rules were 
issued on Delaney grounds.

      Table 1.--Revocations Which Were Based on the Delaney Clause      
------------------------------------------------------------------------
            Pesticide                  Commodity        40 CFR Citation 
------------------------------------------------------------------------
Acephate........................  food handling                  185.100
                                   establishments                       
Benomyl.........................  tomato products,               185.350
                                   raisins                              
Dichlorvos (DDVP)...............  bagged and packaged           185.1900
                                   processed foods                      
Dicofol.........................  dried tea                      185.410
Ethylene Oxide..................  ground spices                 185.2850
Iprodione.......................  dried ginseng,                185.3750
                                   raisins                              
Mancozeb........................  bran of oats                  185.6300
Propargite......................  dried figs, dried             185.5000
                                   tea                                  
Propylene oxide.................  cocoa, gums,                  185.5150
                                   processed nutmeats                   
                                   (except peanuts),                    
                                   processed spices                     
Triadimefon.....................  milled fractions of            185.800
                                   wheat                                
------------------------------------------------------------------------

    Table 2 lists section 409 tolerances for which a final rule was 
issued on not ready-to-eat grounds.

    Table 2.--Revocation Which Was Based on Not Ready-To-Eat Grounds    
------------------------------------------------------------------------
            Pesticide                  Commodity        40 CFR Citation 
------------------------------------------------------------------------
Imazalil........................  citrus oil                    185.3650
------------------------------------------------------------------------

List of Subjects in Part 185

    Environmental protection, Food additives, Pesticides and pests

    Dated: September 19, 1996.

Lynn R. Goldman,
Assistant Administrator for Prevention, Pesticides and Toxic 
Substances.
    Accordingly, 40 CFR chapter I, part 185 is amended as follows:

PART 185--[AMENDED]

    The authority citation for part 185 continues to read as follows:

    Authority: 21 U.S.C. 346a and 371.

Sec. 185.410  [Amendment and Stay Withdrawn]

    2. The amendment removing Sec. 185.410, at 59 FR 10997, March 9, 
1994 and the subsequent stay of the effective date of that amendment, 
at 59 FR 23800, May 9, 1994 are withdrawn.

Sec. 185.1900  [Amendment and Stay Withdrawn]

    3. The revision of Sec. 185.1900 at 58 FR 59667, November 10, 1993 
and the subsquent stay of that revision at 59 FR 11556, March 11, 1994 
are withdrawn.

Sec. 185.2850  [Amendment and Stay Withdrawn]

    4. The amendment removing Sec. 185.2850 published at 61 FR 11993, 
March 22, 1996, and the subsequent stay at 61 FR 25153, May 20, 1996 
are withdrawn.

Secs. 185.5000, 185.5150 and 185.6300  [Amendment Withdrawn]

    5. The amendment to the text of Sec. 185.5000, and the amended text 
for Secs. 185.5150 and 185.6300, published at 61 FR 25153, May 20, 1996 
as a result of a partial stay of the removals published at 61 FR 11993, 
March 22, 1996 are confirmed as final.

Secs. 185.100, 185.800, 185.3650, 185.3750  [Amendment Withdrawn]

    6. The amendments removing Secs. 185.100, 185.800, 185.3650, and 
185.3750, at 61 FR 39542, July 29, 1996 are withdrawn.

[FR Doc. 96-24602 Filed 9-25-96; 8:45 am]
BILLING CODE 6560-50-F

Complete official Federal Register PDF

FR Doc. 96-24598 Publication of Consent Agreements Accepted for Public Comment in the Federal Register
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50430-50431]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24598]

=======================================================================
-----------------------------------------------------------------------

FEDERAL TRADE COMMISSION

16 CFR Parts 2 and 3

Publication of Consent Agreements Accepted for Public Comment in 
the Federal Register

AGENCY: Federal Trade Commission (FTC).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Federal Trade Commission has revised Rule 2.34 and Rule 
3.25(f) of its Rules of Practice, 16 CFR 2.34, 3.25(f) (1996), so that 
the full text of consent agreements accepted for public comment will no 
longer be published in the Federal Register. Instead, a summary of each 
such agreement; the Analysis to Aid Public Comment that accompanies 
each such agreement; and any Commission or Commissioner statements will 
be published in the Federal Register after each such agreement is 
placed on the public record. The Commission is not required by statute 
to publish the full text of its consent agreements and related 
documents in the Federal Register. Moreover, complete versions of these 
materials are publicly available--from the Commission's Office of 
Public Affairs, on its Internet World Wide Web Home Page (at ``http://
www.ftc.gov/os/actions.htm''), and from its Public Reference Room--
prior to the time they are published in the Federal Register. The 
substantial expenditure of public funds required to publish full text 
versions of consent agreements in the Federal Register therefore is not 
warranted.

EFFECTIVE DATES: These rule amendments are effective on September 26, 
1996. Comments may be filed with the Office of the Secretary until 
October 28, 1996.

FOR FURTHER INFORMATION CONTACT:
Donald S. Clark, Office of the Secretary, Federal Trade Commission, 
Sixth Street and Pennsylvania Avenue N.W., Washington D.C. 20580 (202) 
326-2514.

SUPPLEMENTARY INFORMATION: Section 2.34 of the Federal Trade Commission 
Rules of Practice, 16 CFR 2.34 (1996), currently provides that when the 
Commission accepts for public comment a consent agreement under Part 2 
of its Rules of Practice, it ``will publish the agreement, order, and 
explanation in the Federal Register.'' Similarly, section 3.25(f) of 
the Rules, 16 CFR 3.25(f) (1996), provides that when the Commission 
accepts for public comment a consent agreement under Part 3 of its 
Rules of Practice, it ``will publish the agreement, order, and 
explanation in the Federal Register.'' The Commission also places all 
of the documents associated with each Part 2 or Part 3 consent 
agreement--including the agreement itself, the complaint, the Analysis 
to Aid Public Comment, any separate Commission or Commissioner 
statements, and a news release--on the public record. The Commission 
makes these documents available to the public in a number of locations, 
including its Office of Public Affairs (in both paper and electronic 
form), on its Internet World Wide Web Home Page (at ``http://
www.ftc.gov/os/actions/htm'') (in electronic form), and in its Public 
Reference Room (in paper form).
    The Commission estimates that it can save more than $60,000 each 
year by instead printing only the following documents, for each consent 
agreement, in the Federal Register: (1) A summary announcing the 
commencement of the public comment period and indicating that the full 
text of the consent agreement documents is available from the 
Commission's Office of Public Affairs, on its Internet Home Page, and 
from its Public Reference Room; (2) the analysis to aid public comment; 
and (3) any Commission or Commissioner statements. The Commission 
believes that this substantial reduction in expenditures can be 
effected without any adverse effects on the public comment process. At 
the time a particular consent agreement is placed on the public 
record--that is, on the date on which the news release

[[Page 50431]]

describing it is issued--members of the public are fully informed both 
of the terms of the agreement and of how they can file comments 
concerning it. In addition, the news release and all of the consent 
agreement documents typically are made public--in both paper and 
electronic form--at least one week before the consent agreement and the 
analysis appear in the Federal Register. As a result, most individuals 
and entities first learn about the consent agreement from the news 
release, or from news coverage of the agreement. Any member of this 
group who wishes both to comment and to review the full text of the 
agreement can request a copy from the Public Reference Room--using the 
address and telephone number in the news release--or pick up a copy in 
person. Moreover, members of the public can secure an electronic copy 
of each consent agreement package from the Commission's Internet Home 
Page (at ``http://www.ftc.gov/os/actions.htm'') or from the electronic 
bulletin board maintained by the Commission's Office of Public Affairs. 
Furthermore, the Federal Register notice announcing the agreement will 
continue to provide--through the analysis to aid public comment--a 
comprehensive description of both the agreement and the draft 
complaint. As a result, Federal Register users will continue to be 
informed of both the contours of the agreement and that they can, if 
they wish, file comments concerning it. If they need additional detail 
from the agreement itself, they can secure electronic copies and/or 
paper copies from the above sources.
    These rule revisions relate solely to agency practice and, thus, 
are not subject to the notice and comment requirements of the 
Administrative Procedure Act, 5 U.S.C. 553(a)(2), nor to the 
requirements of the Regulatory Flexibility Act, 5 U.S.C. 601(2). The 
Paperwork Reduction Act, 44 U.S.C. 3501, does not apply because these 
revisions do not contain requirements for information collection 
subject to approval of the Office of Management and Budget. Although 
the rule revisions are effective immediately, the Commission welcomes 
comment on them and will consider further revision, as appropriate. 
Such comments may be filed with the Office of the Secretary until 
October 28, 1996.

List of Subjects in 16 CFR Parts 2 and 3

    Administrative practice and procedure.

    In consideration of the foregoing, the Commission hereby amends 
Title 16, Chapter I, Subchapter A, Parts 2 and 3 of the Code of Federal 
Regulations, as follows:
    1. The authority for Parts 2 and 3 continues to read as follows:

    Authority: Sec. 6, 38 Stat. 721, 15 U.S.C. 46.

    2. Section 2.34 is amended so that the third sentence after the 
introductory text beginning with ``The Commission * * *'' and ending 
with ``* * * Federal Register.'' is revised to read as follows:

Sec. 2.34   Disposition.

 * * * * *
    * * * The Commission will publish the explanation in the Federal 
Register. * * *
    3. Section 3.25(f) is amended so that the second sentence in the 
concluding text beginning with ``The Commission * * *'' and ending with 
``* * * Federal Register.'' is revised to read as follows:

Sec. 3.25   Consent agreement settlements.

 * * * * *
    (f) * * * The Commission will publish the explanation in the 
Federal Register. * * *
 * * * * *
    By direction of the Commission, Commissioner Azcuenaga 
dissenting.
Donald S. Clark,
Secretary.

Dissenting Statement of Commissioner Mary L. Azcuenaga Concerning 
Commission Decision To Stop Publishing in the Federal Register the Full 
Text of Consent Agreements Accepted for Public Comment

    Today the Commission revokes its long held policy of publishing 
in the Federal Register the full text of consent agreements accepted 
for public comment. Instead, the Commission will publish a summary, 
an analysis and any Commission or commissioner statements. In 
announcing this decision, the Commission also advises that complete 
versions of the consent agreement, including complaints and orders, 
will continue to be available from the Commission's Office of Public 
Affairs (the press office), the Commission's home page on the World 
Wide Web and the Commission's Public Reference Room (the office that 
serves the general public). In an ideal world, the attainment of 
which is surely very near, these alternative sources should be 
sufficient. Unless we can be confident, however, that the other 
sources are adequately serving the wide audience that follows the 
Commission's actions in the Federal Register, the abandonment of 
that means of disseminating information seems premature.
    The Commission has a long and admirable tradition of genuine 
attentiveness to public comment and of seeking it out even when it 
is not required by law to do so. Out of deference to the members of 
the public whose interests we serve, many of whom have a keen 
interest in and need to know about Commission decisions, I would 
have preferred, before dispensing with our current practice, to have 
greater reason for confidence in the adequacy of the alternative 
sources of the information.

[FR Doc. 96-24598 Filed 9-25-96; 8:45 am]
BILLING CODE 6750-01-M

Complete official Federal Register PDF

FR Doc. 96-24529 Approval and Promulgation of Implementation Plans and Redesignation of Puget Sound, Washington for Air Quality Planning Purposes: Ozone
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50438-50443]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24529]

[[Page 50438]]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 52 and 81

[WA51-7124a; FRL-5613-3]

Approval and Promulgation of Implementation Plans and 
Redesignation of Puget Sound, Washington for Air Quality Planning 
Purposes: Ozone

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: The EPA is announcing its determination that the Puget Sound 
(parts of King, Pierce, and Snohomish Counties) Ozone Nonattainment 
area has attained the public health-based National Ambient Air Quality 
Standard (NAAQS) for ozone (O3). This determination is based upon 
three years of complete, quality-assured, ambient air monitoring data 
for the 1991 to 1993 ozone seasons that demonstrate that the ozone 
NAAQS has been attained. The EPA is also approving the redesignation to 
attainment of the Puget Sound Area and the associated maintenance plan.

DATES: This action will be effective November 25, 1996 unless adverse 
or critical comments are received by October 28, 1996. If the effective 
date is delayed, timely notice will be published in the Federal 
Register.

ADDRESSES: Written comments should be addressed to: Montel Livingston, 
SIP Manager, Office of Air Quality (OAQ-107), EPA, 1200 Sixth Avenue, 
Seattle, Washington 98101.

FOR FURTHER INFORMATION CONTACT: Stephanie Cooper, Office of Air 
Quality, EPA Region 10, 1200 6th Avenue, Seattle, WA 98101, (206) 553-
6917.

SUPPLEMENTARY INFORMATION:

I. Background

    On November 15, 1990, the Clean Air Act Amendments of 1990 (CAA) 
were enacted. (Pub. L. 101-549, 104 Stat. 2399, codified at 42 U.S.C. 
7401-7671q.) Under section 107(d)(1) of the CAA, in conjunction with 
the Governor of Washington, EPA designated the Puget Sound Area as 
nonattainment because the area violated the ozone standard during the 
period from 1989-1991. The Puget Sound Area, which includes lands 
within the Puyallup, Tulalip, Muckleshoot, Stillaguamish, and Nisqually 
Reservations, was classified as ``marginal'' under section 181(a)(1) of 
the CAA.
    The Puget Sound Area has ambient monitoring data that show no 
violations of the ozone NAAQS during the period from 1991 to the 
present. On January 28, 1993 the State of Washington submitted a State 
Implementation Plan (SIP) for compliance with the ozone NAAQS. Public 
hearings were held respectively in Vancouver, SeaTac, and Spokane on 
November 9, 10, and 12, 1992. Also, the State submitted an Ozone 
Maintenance Plan and Redesignation Request on March 4, 1996. A public 
hearing was held in Seattle on October 26, 1995.

II. Review of the State Submittal

    The Puget Sound redesignation request for the nonattainment areas 
meets the five requirements of section 107(d)(3)(E) of the CAA for 
redesignation to attainment. EPA also finds that information and 
requirements provided in the WDOE redesignation request and maintenance 
plan for the Puget Sound nonattainment area demonstrate that the 
107(d)(3)(E) of the CAA requirements have been met for the affected 
tribal lands which include portions of the Stillaguamish Reservation, 
Nisqually Reservation, Tulalip Reservation, Puyallup Reservation and 
Muckleshoot Reservation. The Agency has not determined whether it is 
bound to follow the formal requirements of section 107(d)(3)(E) of the 
CAA when taking such redesignation actions for tribal lands. The action 
to redesignate tribal lands to attainment is being taken today without 
answering that question because information submitted by WDOE satisfies 
each required element for redesignation.
    The following is a brief description of how each of the 
requirements of section 107(d)(3)(E) of the CAA is met. Because the 
maintenance plan is a critical element of the redesignation request, 
EPA will discuss its evaluation of the maintenance plan under its 
analysis of the redesignation request.

A. The Area Must Have Attained the O3 NAAQS

    The State of Washington's redesignation request is based on an 
analysis of quality assured ambient air quality monitoring data which 
is relevant to the maintenance plan and to the redesignation request. 
The most recent ambient air quality monitoring data for calendar year 
1991 through calendar year 1995 show an expected exceedance rate of 
less than 1.0 per year of the ozone NAAQS in the Puget Sound area. 
Because the Puget Sound area has complete quality-assured data showing 
no violations of the standard over the most recent consecutive three-
calendar-year period, the area has met the first statutory criterion of 
attainment of the ozone NAAQS. There are four ambient O3 
monitoring stations in the Puget Sound nonattainment area, and the 
State of Washington has committed to continue monitoring this area in 
accordance with 40 CFR part 58.

B. The Area Has Met All Applicable Requirements Under Section 110, and 
Part D of the Act

1. Section 110 Requirements
    Although section 110 was amended in 1990 (CAAA or the Act), the 
Washington SIP approved by EPA for the ozone marginal nonattainment 
areas meets the requirements of amended section 110(a)(2). A number of 
the requirements did not change in substance and, therefore, EPA 
believes that the pre-amendment SIP met these requirements.
2. Part D Requirements
    Before the nonattainment areas may be redesignated to attainment, 
they must have fulfilled the applicable requirements of part D of the 
CAA. Under part D, an area's classification indicates the requirements 
to which it will be subject. Subpart 1 of part D sets forth the basic 
nonattainment requirements applicable to all nonattainment areas, 
classified as well as non-classifiable. Subpart 2 of part D establishes 
additional requirements for O3 nonattainment areas classified 
under table 1 of section 181(a).
    (a). Subpart 1 of Part D. The State of Washington currently has a 
fully approved New Source Review (NSR) program which was last revised 
and approved June 2, 1995 (60 FR 28726). Upon redesignation of the 
Puget Sound area to attainment, the Prevention of Significant 
Deterioration (PSD) provisions contained in part C of title I are 
applicable. EPA's PSD regulations in 40 CFR 52.21 will apply to the 
Puget Sound area.
    Under section 176(c) of the CAA, States were required to submit 
revisions to their SIPs that include criteria and procedures to ensure 
that Federal actions conform to the air quality planning goals in the 
applicable SIPs. The requirement to determine conformity applies to 
transportation plans, programs and projects developed, funded or 
approved under Title 23 U.S.C. of the Federal Transit Act 
(``transportation conformity''), as well as all other Federal actions 
(``general conformity''). Congress provided for the State revisions to 
be submitted one year after the date of promulgation of final EPA 
conformity regulations. EPA promulgated final transportation conformity 
regulations on November 24, 1993 (58 FR 62188) and final general

[[Page 50439]]

conformity regulations on November 30, 1993 (58 FR 63214). These 
conformity rules require that the States adopt both transportation and 
general conformity provisions in the SIP for areas designated 
nonattainment or subject to a maintenance plan approved under CAA 
section 175A. Pursuant to 40 CFR Sec. 51.396 of the transportation 
conformity rule, the WDOE was required to submit a SIP revision 
containing transportation conformity criteria and procedures consistent 
with those established in the Federal rule by November 25, 1994. 
Similarly, pursuant to 40 CFR 51.851 of the general conformity rule, 
the WDOE was required to submit a SIP revision containing general 
conformity criteria and procedures consistent with those established in 
the Federal rule by December 1, 1994. The WDOE submitted its 
transportation conformity SIP revision to EPA on December 1, 1995. This 
SIP has not been fully approved by EPA. The WDOE has not submitted its 
general conformity SIP revision.
    Although this redesignation request was submitted to EPA after the 
due dates for the SIP revisions for transportation conformity (58 FR 
62188) and general conformity (58 FR 63214) rules, EPA believes it is 
reasonable to interpret the conformity requirements as not being 
applicable requirements for purposes of evaluating the redesignation 
request under section 107(d). The rationale for this is based on a 
combination of two factors. First, the requirement to submit SIP 
revisions to comply with the conformity provisions of the Act continues 
to apply to areas after redesignation to attainment. Therefore, the 
State remains obligated to adopt the transportation and general 
conformity rules even after redesignation and would risk sanctions for 
failure to do so. While redesignation of an area to attainment enables 
the area to avoid further compliance with most requirements of section 
110 and part D, since those requirements are linked to the 
nonattainment status of an area, the conformity requirements apply to 
both nonattainment and maintenance areas. Second, the federal 
conformity rules require the performance of conformity analyses in the 
absence of state-adopted rules. Therefore, a delay in adopting State 
rules does not relieve an area from the obligation to implement 
conformity requirements.
    Because areas are subject to the conformity requirements regardless 
of whether they are redesignated to attainment, and must implement 
conformity under Federal rules if State rules are not yet adopted, EPA 
believes it is reasonable to view these requirements as not being 
applicable requirements for purposes of evaluating a redesignation 
request.
    Therefore, EPA has modified its national policy regarding the 
interpretation of the provisions of section 107(d)(3)(E) concerning the 
applicable requirements for purposes of reviewing an ozone 
redesignation request. (See 61 FR 2918, January 30, 1996). Under this 
policy, for the reasons just discussed, EPA believes that the ozone 
redesignation request for the Puget Sound area may be approved 
notwithstanding the lack of submitted and approved state transportation 
and general conformity rules.
    (b). Subpart 2 of Part D. The CAA was amended on November 15, 1990, 
Public Law 101-549, 104 Stat. 2399, codified at 42 U.S.C. 7401-7671q. 
EPA was required to classify O3 nonattainment areas according to 
the severity of their problem. The Puget Sound area (parts of King, 
Pierce, and Snohomish Counties) was designated as marginal O3 
nonattainment. Because this area is marginal, the area must meet the 
requirements of section 182(a) of the CAA. EPA has analyzed the SIP and 
determined that it is consistent with the requirements of amended 
section 182. Below is a summary of how the area has met the 
requirements of these sections.
    (i) Emissions Inventory. The CAA required an inventory of all 
actual emissions from all sources, as described in section 172(c)(3) by 
November 15, 1992. As part of the redesignation request submitted on 
March 4, 1996, WDOE submitted a base year 1993 emission inventory for 
the Puget Sound area. With this notice, EPA is approving the base year 
inventory for the Puget Sound area.
    (ii) Reasonably Available Control Technology (RACT). The CAA also 
amended section 182(a)(2)(A), in which Congress statutorily adopted the 
requirement that O3 nonattainment areas fix their deficient 
Reasonably Available Control Technology (RACT) rules for O3. Areas 
designated nonattainment before amendment of the CAA and which retained 
that designation and were classified as marginal or above as of 
enactment are required to meet the RACT fix-up requirement. The Puget 
Sound area was designated nonattainment after 1990, and therefore, this 
area is not subject to the RACT fix-up requirement.
    (iii) Emissions Statements. The CAA required that the SIP be 
revised by November 15, 1992, to require stationary sources of oxides 
of nitrogen (NOX) and VOCs to provide the state with a statement 
showing actual emissions each year. The WDOE submitted an Emission 
Statement program as part of its O3 SIP on January 28, 1993, and 
EPA approved the program on November 14, 1994.

C. The Area Has a Fully Approved SIP Under Section 110(k) of the CAA

    EPA has determined that Washington has a fully approvable O3 
SIP under section 110(k) for the ozone marginal nonattainment areas, 
which also meets the applicable requirements of section 110 and part D 
as discussed above.

D. The Air Quality Improvement Must Be Permanent and Enforceable

    Several control measures have been put into place since the 
nonattainment area violated the O3 NAAQS. One control measure is 
the improvement in tailpipe emissions associated with the Federal Motor 
Vehicle Control Program (FMVCP). This program reduces VOC and NOx 
emissions as newer, cleaner vehicles replace older, high emitting 
vehicles. Additionally, in 1993 the state expanded and intensified its 
vehicle inspection and maintenance (I/M) program. Implementation of 
this control measure has led to additional reductions in emissions. 
This I/M program meets EPA's low enhanced performance standard.
    In association with the emission inventory discussed below, the 
State of Washington has demonstrated that actual enforceable emission 
reductions are responsible for the recent air quality improvement.

E. The Area Must Have a Fully Approved Maintenance Plan Pursuant to 
Section 175A of the CAA

    Section 175A of the CAA sets forth the elements of a maintenance 
plan for areas seeking redesignation from nonattainment to attainment. 
The plan must demonstrate continued attainment of the applicable NAAQS 
for at least ten years after the Administrator approves a redesignation 
to attainment. Eight years after the redesignation, the state must 
submit a revised maintenance plan which demonstrates attainment for the 
ten years following the initial ten-year period. To provide for the 
possibility of future NAAQS violations, the maintenance plan must 
contain contingency measures, with a schedule for implementation, 
adequate to assure prompt correction of any air quality problems.
    In this notice, EPA is approving Washington's maintenance plan for 
the Puget Sound marginal nonattainment area because EPA finds that the 
submittal meets the requirements of section 175A.

[[Page 50440]]

1. Emissions Inventory--Base Year Inventory
    Along with the submittal of the redesignation request and 
maintenance plan, Washington submitted comprehensive O3 emission 
inventories for the base year and subsequent years for the Puget Sound 
area on March 4, 1996. The inventories included biogenic, area, 
stationary, and mobile sources using 1993 as the base year for 
calculations to demonstrate maintenance. The 1993 inventory is 
considered representative of attainment conditions because the NAAQS 
was not violated during that year.
    The State of Washington submittal contains the detailed inventory 
data and summaries by county and source category. This inventory was 
compiled in accordance with EPA guidance. A summary of the base year 
and projected maintenance year inventories are shown for VOCs and 
NOX in the following tables.
2. Demonstration of Maintenance--Projected Inventories
    On March 4, 1996, the State of Washington submitted the Central 
Puget Sound Ozone Nonattainment Area 1993-2010 Emission Inventory 
Projections. Total VOC, NOX, and CO emissions were projected from 
the 1993 base year out to 2010. These projected inventories were 
prepared in accordance with EPA guidance. Refer to EPA's Technical 
Support Document (TSD) (located in docket WA51-7124) prepared for this 
notice for more details regarding the projected inventory for the Puget 
Sound area.

                                   Puget Sound VOC Emission Inventory Summary                                   
                                              [Tons per summer day]                                             
----------------------------------------------------------------------------------------------------------------
                                              1993                                                              
                                              base      1995      1998      2001      2005      2007      2010  
                                              year                                                              
----------------------------------------------------------------------------------------------------------------
On-road...................................    248.20    222.22    191.42    174.05    165.31    164.00    159.83
Non-road..................................    136.00    136.00    143.80    142.10    133.10    131.10    131.60
Stationary Area...........................    148.63    118.68    121.47    124.18    128.46    131.20    134.32
Point.....................................     31.49     20.24     20.24     20.24     20.24     20.24     20.24
Biogenic..................................    291.25    291.25    291.25    291.25    291.25    291.25    291.25
                                           ---------------------------------------------------------------------
      Totals..............................    855.57    788.39    768.18    751.82    738.36    737.79    737.24
----------------------------------------------------------------------------------------------------------------

                                   Puget Sound NOX Emission Inventory Summary                                   
                                              [Tons per summer day]                                             
----------------------------------------------------------------------------------------------------------------
                                              1993                                                              
                                              base      1995      1998      2001      2005      2007      2010  
                                              year                                                              
----------------------------------------------------------------------------------------------------------------
On-road...................................    279.30    266.03    245.24    235.91    228.26    223.13    217.67
Non-road..................................     79.90     80.80     87.50     88.90     91.00     93.10     97.60
Stationary Area...........................     19.26     19.55     18.41     17.61     17.62     17.75     17.85
Point.....................................     24.31     24.31     24.31     24.31     24.31     24.31     24.31
                                           ---------------------------------------------------------------------
      Totals..............................    402.77    390.69    375.46    366.73    361.19    358.29    357.43
----------------------------------------------------------------------------------------------------------------

    As indicated in the following table, an emissions decrease in VOCs 
and NOX in the Puget Sound nonattainment area is projected 
throughout the maintenance period. EPA believes that these emissions 
projections demonstrate that the Puget Sound nonattainment area will 
continue to maintain the O3 NAAQS.

           VOC and NOX Projected Emissions Changes (1993-2010)          
                              [In percent]                              
------------------------------------------------------------------------
                                                       VOCs       NOX   
------------------------------------------------------------------------
Puget Sound.......................................     -13.80     -11.25
------------------------------------------------------------------------

3. Verification of Continued Attainment
    Continued attainment of the O3 NAAQS in the marginal 
nonattainment areas depends, in part, on the State of Washington's 
efforts toward tracking indicators of continued attainment during the 
maintenance period. On an annual basis the Department of Ecology will 
analyze the most recent three consecutive years of ambient ozone data 
to verify continued attainment of the NAAQS for ozone. Additionally, a 
First Implementation Phase Report will be published in 1998 to 
chronicle the results of in-use vehicle emissions projects and research 
activities related to the Maintenance Plan.
4. Contingency Plan
    The level of VOC and NOX emissions in the nonattainment area 
will largely determine its ability to stay in compliance with the 
O3 NAAQS in the future. Despite the State of Washington's best 
efforts to demonstrate continued compliance with the NAAQS, the ambient 
air pollutant concentrations may exceed or violate the NAAQS. 
Therefore, the State of Washington has provided contingency measures 
with a schedule for implementation in the event of a future O3 air 
quality problem. The plan contains two tiers of contingency measures. 
The first tier involves improving the existing motor vehicle inspection 
and maintenance (I/M) program (within the current statutory authority 
of the Department of Ecology) to reduce VOC vehicle emissions. The I/M 
improvements will be triggered if the ozone standard is exceeded three 
times at any one permanent monitoring site over two consecutive 
calendar years, or in the event of a quality assured ozone standard 
violation. The measure will be implemented no later than June 15th of 
the year following the three exceedances or the violation.
    The second tier contingency measure is a mandatory reduction in 
gasoline

[[Page 50441]]

volatility, which will decrease the emission of volatile organic 
compounds. The measure would be triggered pending a measured ozone 
violation. If triggered, the measure would require all gasoline made 
available for sale in King, Pierce, and Snohomish Counties between June 
15 and September 15 to have a Reid Vapor Pressure (RVP) of 7.8 psi. If 
both triggers and hence both contingency measures are activated, the 
Ozone Maintenance Plan will be amended to include one or more new 
contingency measures.
    EPA finds that the contingency measures provided in the State of 
Washington's submittal meet the requirements of section 175A(d) of the 
CAA.
5. Subsequent Maintenance Plans Revisions
    In accordance with section 175A(b) of the CAA, the State of 
Washington is required to submit a revised maintenance SIP eight years 
after the marginal nonattainment areas redesignate to attainment. Such 
a revised SIP will provide for an additional ten years maintenance.

III. Final Action

    EPA is approving the Puget Sound nonattainment area's O3 
maintenance plan because it meets the requirements of section 175A of 
the CAA. The EPA is redesignating the Puget Sound O3 nonattainment 
area to attainment for O3 because the State of Washington has 
demonstrated compliance with the requirements of section 107(d)(3)(E) 
of the CAA for redesignation. In addition, EPA, after consultation with 
the affected tribal governments, is redesignating to attainment those 
areas in the Puget Sound ozone nonattainment area that are located 
within the Tulalip Reservation, the Stilliguamish Reservation, the 
Puyallup Reservation, the Nisqually Reservation, and the Muckleshoot 
Reservation. The Agency believes that the redesignation requirements 
are effectively satisfied here because of information provided by WDOE 
and requirements contained in the WDOE SIP and Maintenance Plan. 
Additionally, EPA is approving the 1993 base year emission inventory 
for the Puget Sound nonattainment area.
    The O3 SIP is designed to satisfy the requirements of part D 
of the CAA and to provide for attainment and maintenance of the O3 
NAAQS. This final redesignation should not be interpreted as 
authorizing the State of Washington to delete, alter, or rescind any of 
the VOC or NOX emission limitations and restrictions contained in 
the approved O3 SIP. Changes to O3 SIP VOC regulations 
rendering them less stringent than those contained in the EPA approved 
plan cannot be made unless a revised plan for attainment and 
maintenance is submitted to and approved by EPA. Unauthorized 
relaxations, deletions, and changes could result in both a finding of 
non-implementation (section 179(b) of the CAA) and in a SIP deficiency 
call made pursuant to section 110(a)(2)(H) of the CAA.
    The EPA is publishing this action without prior proposal because 
the Agency views this as a noncontroversial amendment and anticipates 
no adverse comments. However, in a separate document in this Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed. This action will be 
effective November 25, 1996 unless, by October 28, 1996, adverse or 
critical comments are received.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent notice that will 
withdraw the final action. All public comments received will be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time. If no such comments are received, the public is 
advised that this action will be effective November 25, 1996.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any state implementation plan. Each request for revision to 
the state implementation plan shall be considered separately in light 
of specific technical, economic, and environmental factors and in 
relation to relevant statutory and regulatory requirements.

IV. Administrative Requirements

A. Executive Order 12866

    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget (OMB) has 
exempted this regulatory action from E.O. 12866 review.

B. Regulatory Flexibility Act

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    SIP approvals under section 110 and subchapter I, Part D of the CAA 
do not create any new requirements, but simply approve requirements 
that the state is already imposing. Therefore, because the federal SIP-
approval does not impose any new requirements, I certify that it does 
not have a significant impact on any small entities affected. Moreover, 
due to the nature of the federal-state relationship under the CAA, 
preparation of a regulatory flexibility analysis would constitute 
federal inquiry into the economic reasonableness of state action. The 
CAA forbids EPA to base its actions concerning SIPs on such grounds. 
Union Electric Co. versus E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 42 
U.S.C. 7410(a)(2).
    Redesignation of an area to attainment under section 107(d)(3)(E) 
of the CAA does not impose any new requirements on small entities. 
Redesignation is an action that affects the status of a geographical 
area and does not impose any regulatory requirements on sources. I 
certify that the approval of the redesignation request will not affect 
a substantial number of small entities.

C. Unfunded Mandates

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under Section 205, EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires EPA to establish a plan 
for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    EPA has determined that the approval action promulgated does not 
include a

[[Page 50442]]

Federal mandate that may result in estimated costs of $100 million or 
more to either State, local, or tribal governments in the aggregate, or 
to the private sector. This Federal action approves pre-existing 
requirements under State or local law, and imposes no new Federal 
requirements. Accordingly, no additional costs to State, local, or 
tribal governments, or to the private sector, result from this action.

D. Submission to Congress and the General Accounting Office

    Under 5 U.S.C. 801(a)(1)(A) as added by the Small Business 
Regulatory Enforcement Fairness Act of 1996, EPA submitted a report 
containing this rule and other required information to the U.S. Senate, 
the U.S. House of Representatives and the Comptroller General of the 
General Accounting Office prior to publication of the rule in today's 
Federal Register. This rule is not a ``major rule'' as defined by 5 
U.S.C. 804(2).

E. Petitions for Judicial Review

    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by November 25, 1996. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review may be filed and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements. (See section 307(b)(2), 42 U.S.C. 
7607(b)(2).

List of Subjects

40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Incorporation by reference, Ozone, Volatile organic 
compounds.

40 CFR Part 81

    Air pollution control, National parks, Wilderness areas.

    Note: Incorporation by reference of the Implementation Plan for 
the State of Washington was approved by the Director of the Office 
of Federal Register on July 1, 1982.

    Dated: September 16, 1996.
Chuck Clarke,
Regional Administrator.

    Chapter I, title 40 of the Code of Federal Regulations is amended 
as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart WW--Washington

    2. Section 52.2470 is amended by adding paragraph (c)(66) to read 
as follows:

Sec. 52.2470  Identification of plan.

* * * * *
    (c) * * *
    (66) On March 4, 1996 the Director of WDOE submitted to the 
Regional Administrator of EPA a revision to the Ozone State 
Implementation Plan for the Puget Sound area requesting the Puget Sound 
Nonattainment Area be reclassified to attainment and containing a 
maintenance plan that demonstrates continued attainment of the NAAQS 
for ozone. The emission inventory projections are included in the 
maintenance plan.
    (i) Incorporation by reference.
    (A) Letter submitted on March 4, 1996 from the Washington State 
Department of Ecology requesting the redesignation and submitting the 
maintenance plan; Central Puget Sound Region Redesignation Request and 
Maintenance Plan for the National Ambient Ozone Standard adopted on 
Febuary 6, 1996.
    (ii) Additional material.
    (A) Appendices to the Central Puget Sound Region Redesignation 
Request and Maintenance Plan for the National Ambient Ozone Standard, 
November 1995: Appendix A, Technical Analysis Protocol; Appendix B, 
Ozone Air Quality Monitoring Site Network; Appendix C, Ambient Ozone 
Monitoring Data; Appendix D, Historical and Projected Puget Sound 
Region VMT and Employment; Appendix E, 1993-2010 Emission Inventory 
Projection; Appendix F, Transportation Conformity Process; Appendix G, 
Outline of Puget Sound Tropospheric Ozone Research Plan; and Appendix 
H, Prospective Vehicle Inspection and Maintenance (Vehicle I/M) Program 
Evaluation Outline.

PART 81--[AMENDED]

    1. The authority citation for part 81 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

    2. In Sec. 81.348, the table for ``Washington-Ozone'' is amended by 
revising the entry for Seattle-Tacoma Area to read as follows:

Sec. 81.348  Washington.

* * * * *

                                                                    Washington--Ozone                                                                   
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             Designation                                             Classification                     
           Designated area           -------------------------------------------------------------------------------------------------------------------
                                                Date \1\                       Type                       Date \1\                       Type           
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                        
                    *                *                  *                  *                  *                  *                  *                   
Seattle-Tacoma Area:                                                                                                                                    

[[Page 50443]]

                                                                                                                                                        
    The following boundary includes   [Insert date 60 days from    Attainment                                                                           
     all of Pierce County, and all     date of publication]                                                                                             
     of King County except a small                                                                                                                      
     portion on the north-east                                                                                                                          
     corner and the western portion                                                                                                                     
     of Snohomish County: Starting                                                                                                                      
     at the mouth of the Nisqually                                                                                                                      
     river extend northwesterly                                                                                                                         
     along the Pierce County line to                                                                                                                    
     the southernmost point of the                                                                                                                      
     west couty line of King County;                                                                                                                    
     thence northerly along the                                                                                                                         
     county line to the southermost                                                                                                                     
     point of the west county ling                                                                                                                      
     of Snohomish County; thence                                                                                                                        
     northerly along the county line                                                                                                                    
     to the intersection with SR                                                                                                                        
     532; thence easterly along the                                                                                                                     
     north line of SR 532 to the                                                                                                                        
     intersection of I-5, continuing                                                                                                                    
     east along the same road now                                                                                                                       
     identified as Henning Rd., to                                                                                                                      
     the intersection with SR 9 at                                                                                                                      
     Bryant; thence continuing                                                                                                                          
     easterly on Bryant East Rd. and                                                                                                                    
     Rock Creek Rd., also identified                                                                                                                    
     as Grandview Rd., approximately                                                                                                                    
     3 miles to the point at which                                                                                                                      
     it is crossed by the existing                                                                                                                      
     BPA electrical transmission                                                                                                                        
     line; thence southeasterly                                                                                                                         
     along the BPA transmission line                                                                                                                    
     approximately 8 miles to point                                                                                                                     
     of the crossing of the south                                                                                                                       
     fork of the Stillaguamish                                                                                                                          
     River; thence continuing in a                                                                                                                      
     southeasterly direction in a                                                                                                                       
     meander line following the bed                                                                                                                     
     of the River to Jordan Road;                                                                                                                       
     southerly along Jordan Road to                                                                                                                     
     the north city limits of                                                                                                                           
     Granite Falls; thence following                                                                                                                    
     the north and east city limits                                                                                                                     
     to 92nd St. N.E. and Menzel                                                                                                                        
     Lake Rd.; thence south-                                                                                                                            
     southeasterly along the Menzel                                                                                                                     
     Lake Rd. and the Lake Roesiger                                                                                                                     
     Rd. a distance of approximately                                                                                                                    
     6 miles to the northernmost                                                                                                                        
     point of Lake Roesiger; thence                                                                                                                     
     southerly along a meander line                                                                                                                     
     following the middle of the                                                                                                                        
     Lake and Roesiger Creek to                                                                                                                         
     Woods Creek; thence southerly                                                                                                                      
     along a meader line following                                                                                                                      
     the bed of the Creek                                                                                                                               
     approximately 6 miles to the                                                                                                                       
     point the Creek is crossed by                                                                                                                      
     the existing BPA electrical                                                                                                                        
     transmission line; thence                                                                                                                          
     easterly along the BPA                                                                                                                             
     transmission line approximately                                                                                                                    
     0.2 miles; thence southerly                                                                                                                        
     along the BPA Chief Joseph-                                                                                                                        
     Covington electrical                                                                                                                               
     transmission line approximately                                                                                                                    
     3 miles to the north line of SR                                                                                                                    
     2; thence southeasterly along                                                                                                                      
     SR 2 to the intersection with                                                                                                                      
     the east county line of King                                                                                                                       
     County; thence south along the                                                                                                                     
     county line to the northernmost                                                                                                                    
     point of the east county line                                                                                                                      
     of Pierce County; thence along                                                                                                                     
     the county line to the point of                                                                                                                    
     beginning at the mouth of the                                                                                                                      
     Nisqually River.                                                                                                                                   
                                                                                                                                                        
                   *                  *                  *                  *                  *                  *                  *                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ This date is November 15, 1990, unless otherwise noted.                                                                                             

[FR Doc. 96-24529 Filed 9-25-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-24482 National Oil and Hazardous Substance Contingency Plan; National Priorities List Update
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50443-50444]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24482]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300

[FRL-5614-7]

National Oil and Hazardous Substance Contingency Plan; National 
Priorities List Update

AGENCY: Environmental Protection Agency.

ACTION: Notice of deletion of the McChord AFB (Wash Rack/Treatment) 
site located in Pierce County, Tacoma, Washington, from the National 
Priorities List (NPL).

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) announces the 
deletion of the McChord AFB (Wash Rack/Treatment) site, located in 
Pierce County, Tacoma, Washington, from the National Priorities List. 
The NPL is Appendix B of 40 CFR part 300 which is the National Oil and 
Hazardous Substances Contingency Plan (NCP) which EPA promulgated 
pursuant to Section 105 of the Comprehensive Environmental Response, 
Compensation, and Liability Act of 1980 as amended (CERCLA). EPA and 
the State of Washington have determined that no further cleanup under 
CERCLA is appropriate and that the selected remedy has been protective 
of public health, welfare and the environment.

EFFECTIVE DATE: September 26, 1996.

FOR FURTHER INFORMATION CONTACT: Kathleen Stryker, Site Manager, U.S. 
Environmental Protection Agency, Region 10, 1200 6th Avenue, ECL-115, 
Seattle, WA 98101, (206) 553-1171.

SUPPLEMENTARY INFORMATION: The site to be deleted from the NPL is: 
McChord AFB (Wash Rack/Treatment), Pierce County, Tacoma, Washington.
    A Notice of Intent to Delete for the site was published July 22, 
1996 (61 FR 37877). The closing date for comments was August 21, 1996. 
McChord Air Force base received three inquiries regarding the 
delisting. Responses to these inquiries are documented in a 
responsiveness summary which is available in the public information 
repositories.
    EPA identifies sites which appear to present a significant risk to 
public health, welfare and the environment and it maintains the NPL as 
the list of those sites. Any site deleted from the NPL remains eligible 
for remedial actions in the unlikely event that conditions at the site 
warrant such action. Deletion of a site from the NPL does not affect 
responsible party liability or impede Agency efforts to recover costs 
associated with response efforts.

[[Page 50444]]

List of Subjects in 40 CFR Part 300

    Environmental protection, Air pollution control. Chemicals, 
Hazardous substances, Hazardous waste, Intergovernmental relations, 
Penalties, Reporting and recordkeeping requirements, Superfund, Water 
pollution control, Water supply.

    Dated: September 16, 1996.
Chuck Clarke,
Regional Administrator, Region 10.

    For the reasons set out in the preamble, 40 CFR part 300 is amended 
as follows:

PART 300--[AMENDED]

    1. The authority citation for part 300 continues to read as 
follows:

    Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 
12777, 56 FR 54757, 3 CFR 1991 Comp., p. 351; E.O. 12580, 52 FR 
2923, 3 CFR 1987 Comp., p. 193.

Appendix B--[Amended]

    2. Table 2 of Appendix B to part 300 is amended by removing the 
site for McChord Air Force Base (Wash Rack/Treat) Tacoma, Washington.

[FR Doc. 96-24482 Filed 9-25-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-24398 Performance-Oriented Packaging Standards; Final Transitional Provisions
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50616-50629]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24398]

[[Page 50615]]

_______________________________________________________________________

Part IV

Department of Transportation

_______________________________________________________________________

Research and Special Programs Administration

_______________________________________________________________________

49 CFR Part 171, et al.

Performance-Oriented Packaging Standards; Final Transitional 
Provisions; Final Rule

Federal Register / Vol. 61, No. 188 / Thursday, September 26, 1996 / 
Rules and Regulations

[[Page 50616]]

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Parts 171, 172, 173, 178

[Docket No. HM-181H; Amdt Nos. 171-147, 172-150, 173-255, 178-117]
RIN 2137-AC66

Performance-Oriented Packaging Standards; Final Transitional 
Provisions

AGENCY: Research and Special Programs Administration (RSPA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: RSPA is incorporating into the Hazardous Materials Regulations 
(HMR) a number of changes, based on agency initiative, petitions for 
rulemaking and comments received at public meetings, to the 
classification of certain hazardous materials which are poisonous by 
inhalation and to provisions for the manufacture, use and reuse of 
hazardous materials packagings. These regulatory changes are intended 
to improve safety, reduce compliance costs for offerors and 
transporters of hazardous materials, make the regulations easier to 
use, and correct errors.

DATES: Effective date. The effective date of these amendments is 
January 1, 1997.
    Compliance date. Because the amendments adopted herein generally 
clarify and relax certain provisions scheduled to go into effect on 
October 1, 1996, RSPA is authorizing immediate voluntary compliance. 
However, persons voluntarily complying with these regulations should be 
aware that petitions for reconsideration may be received and, as a 
result of RSPA's evaluation of those petitions, the amendments adopted 
in this final rule could be subject to further revision.
    Incorporation by reference. The incorporation by reference of 
certain publications listed in these amendments has been approved by 
the Director of the Federal Register as of January 1, 1997.

FOR FURTHER INFORMATION CONTACT: Beth Romo, telephone (202) 366-8553, 
Office of Hazardous Materials Standards, or Bill Gramer, telephone 
(202) 366-4545, Office of Hazardous Materials Technology, Research and 
Special Programs Administration, Washington DC, 20590-0001.

SUPPLEMENTARY INFORMATION:

I. Background

    On December 21, 1990, RSPA published a final rule [Docket HM-181; 
55 FR 52402], which comprehensively revised the HMR with respect to 
hazard communication, classification, and packaging requirements based 
on the United Nations (UN) Recommendations on the Transport of 
Dangerous Goods (UN Recommendations). A document responding to 
petitions for reconsideration and containing editorial and substantive 
revisions to the final rule was published on December 20, 1991 [56 FR 
66124]. On October 1, 1992, under Dockets HM-181 and HM-189, RSPA 
issued editorial and technical corrections to the regulations published 
in 1991. On September 24, 1993, RSPA issued a final rule under Docket 
HM-181F [58 FR 50224] which made changes to the HMR based on agency 
initiative and petitions for rulemaking received since the December 20, 
1991 response to petitions for reconsideration. That final rule 
primarily revised requirements with a mandatory compliance date of 
October 1, 1993, as provided in the transitional provisions in 
Sec. 171.14(b)(4).
    RSPA published a notice of proposed rulemaking (NPRM) on June 26, 
1996, under Docket HM-181H [61 FR 33216] to address most remaining 
issues associated with the implementation of Docket HM-181 provisions 
and certain other issues arising from a final rule issued December 29, 
1994, under Docket HM-215A [59 FR 67390]. These issues were raised 
through petitions for rulemaking and agency initiative.
    RSPA proposed changes to numerous requirements with a compliance 
date of October 1, 1996. Although these changes focus primarily on 
provisions concerning hazard classification and the maintenance and use 
of performance packaging, RSPA also proposed changes to intermediate 
bulk container (IBC) requirements, portable tank requirements, and 
regulated medical waste provisions adopted under Dockets HM-181E and 
HM-181G, respectively. Several current exemptions were proposed for 
conversion into regulations of general applicability, and an approval 
concerning design qualification and periodic testing was proposed for 
incorporation into the HMR.

II. Summary of Comments to the NPRM

    RSPA received nearly 40 comments in response to the proposed rule. 
The comments were submitted by chemical manufacturing companies, trade 
associations, packaging manufacturers, drum reconditioners, and various 
organizations representing the medical waste industry. Commenters were 
uniformly supportive of RSPA's efforts to address remaining issues 
associated with Docket HM-181 and other issues arising from the Docket 
HM-215A final rule. Certain issues proposed in the notice received 
little or no comment. Other issues, such as drum reuse provisions, 
display packs for ORM-D materials, an exception proposed for certain 
Division 6.2 waste materials, and winter filling limits for tank cars, 
were the focus of many of the comments. Several commenters requested 
amendments to the HMR other than those proposed as part of this 
initiative. Most of these suggestions are beyond the scope of the 
proposed changes in this rule and are under review.
    The Hazardous Materials Advisory Council (HMAC) expressed concern 
that the proposed rule frequently cited a petition for rulemaking [P-
1169] without proposing adoption or discussing other provisions 
identified by HMAC in their April 13, 1993 petition. HMAC also claimed 
that another petition [P-1232], addressing outage requirements for 
materials poisonous by inhalation, merited consideration because it 
appeared to be within the scope of the Docket HM-181H rulemaking.
    Petition P-1169 contained 25 separate issues that HMAC submitted to 
RSPA for consideration to amend the HMR. Of the 25 issues identified in 
that petition, RSPA has adopted a majority, including seven issues in 
this rulemaking. The few remaining issues will appear in upcoming 
proposed rulemaking actions (such as HM-215B) or are presently under 
review.
    Under Docket HM-181, RSPA adopted a five percent outage requirement 
for poisonous by inhalation hazard materials in bulk packagings. 
Chemical manufacturers and associations, such as HMAC, opposed this 
requirement, claiming that any safety benefit is offset by additional 
shipments and resultant costs. RSPA believes a change in outage 
requirements is beyond the scope of this rulemaking.

III. Summary of Regulatory Changes by Section

    Listed below is a section-by-section summary of changes and, as 
applicable, a discussion of comments received.

Part 171

    Section 171.7. The table of material incorporated by reference is 
amended by adding a new entry referencing a publication issued by the 
Department of Health and Human Services for defining biosafety levels 
and adding two new ASTM steel standards referenced in Sec. 178.601.
    Section 171.14. All transitional provisions reflecting a compliance 
date of October 1, 1996, or earlier are

[[Page 50617]]

removed. One commenter representing the agricultural chemical industry 
asked RSPA to establish a five-year delayed compliance date for 
products in DOT specification and non-specification packagings filled 
before October 1, 1996. The commenter described a lengthy process for 
agricultural chemicals moving through a distribution chain to end users 
and then frequent product returns several years after the original 
sale. According to the commenter, an additional five-year compliance 
period would provide sufficient time for the industry to eliminate any 
non- specification and DOT-specification packagings which would not 
otherwise be authorized after October 1, 1996.
    RSPA provided a five-year transition period from October 1, 1991 to 
October 1, 1996 for users of these packagings to deplete inventory and 
phase in UN performance packagings. RSPA believes this five-year 
transition period has afforded industry sufficient time to prepare for 
the October 1, 1996 compliance date. However, RSPA recognizes that an 
extensive distribution process that includes procedures for return of 
products to distributors warrants limited relief to allow the 
transportation of materials in previously authorized and filled 
packages to end users or for their return, repackaging, or disposal. 
From an overall transportation safety perspective, it is RSPA's view 
that it is safer to allow one final shipment of these previously 
authorized and filled packagings than to compel the transfer of 
materials, such as pesticides, into packagings required by the HMR as 
of October 1, 1996.
    Therefore, RSPA is adding a provision to authorize non-bulk 
packagings, other than cylinders, which were filled prior to October 1, 
1996 in conformance with regulations in effect on September 30, 1996, 
to be offered for transportation and transported domestically until 
October 1, 1999. RSPA believes a three-year delay in compliance affords 
sufficient time for these packagings to be eliminated from a 
distribution system. It is emphasized that this provision does not 
authorize the filling of packagings, only offering and transportation 
of packagings filled prior to October 1, 1996.
    In addition, three other transition provisions are retained for 
packages filled prior to October 1, 1991, new placard specifications, 
and authorization for use of fiber drums.

Part 172

    Section 172.101. The text preceding the Sec. 172.101 Hazardous 
Materials Table (HMT) sets forth procedures for using the HMT. To 
clarify procedures contained in paragraph (c)(12)(iii) for selecting a 
proper shipping name for a material that meets the definition of more 
than one hazard class, RSPA proposed to replace the phrase ``identified 
* * * by a specific description'' with ``identified * * * specifically 
by name'' and include an example. All three commenters addressing this 
issue supported this proposed change, stating that it will clarify the 
procedure for selecting a proper shipping name.
    In addition, RSPA is adding as proposed a new paragraph 
(c)(10)(iii) which clarifies the process for selecting a proper 
shipping name for a mixture of two or more hazardous materials in the 
same hazard class. Currently, paragraph (c)(10)(i) contains a provision 
for selecting a proper shipping name for a mixture of a hazardous 
material and non-hazardous material, and paragraph (c)(12)(ii) 
prescribes the proper shipping name selection process for a material 
meeting more than one hazard class.
    Section 172.101; the Hazardous Materials Table (HMT). A new entry 
to provide for the domestic transportation of black powder for small 
arms reclassed as a Division 4.1 is added as proposed. This revision is 
based on comparable provisions for smokeless powder, small arms 
cartridges and power device cartridges. In conjunction with this 
change, a new Special Provision 70 and new non-bulk packaging section 
Sec. 173.170 is added.
    In the HMT, the entries ``Chlorosilanes, n.o.s.'', with 
identification numbers UN 2986, UN 2987, and UN 2988, are not 
authorized to be shipped in DOT Specification Intermodal (IM) portable 
tanks. Based on a petition for rulemaking requesting that RSPA 
authorize IM portable tanks for all chlorosilanes and that the use of 
IM portable tanks for these materials will not compromise safety and 
would be consistent with other specific authorizations, RSPA is 
adopting the proposal to authorize certain IM portable tanks for all 
chlorosilanes. RSPA is adding special provisions in Column (7) for 
``Chlorosilanes, n.o.s.'', with identification numbers UN 2986, UN 
2987, and UN 2988, to permit the transport of these materials in IM 
portable tanks.
    Bulk packaging references for three Type F organic peroxides (UN 
3110, UN 3119, and UN 3120) are revised by changing ``None'' to ``225'' 
in Column (8C) to indicate that these materials are authorized in bulk 
packagings. In addition, for the entries ``Organic Peroxide, type F, 
liquid (or solid), temperature controlled'' (UN 3119 and UN 3120), in 
Column (8A), the packaging exception reference ``152'' is removed for 
each entry to indicate that these temperature controlled organic 
peroxides are not eligible for packaging exceptions. One commenter 
noted that even though Sec. 173.225 is authorized in Column (8C) of the 
Hazardous Materials Table, this authorization alone will not allow bulk 
packaging for organic peroxide, type F, solid. A note in Column 8 of 
the Organic Peroxide Table, in conjunction with the technical name of 
the material, indicates whether the material is authorized to be 
packaged in a bulk packaging.
    More than 30 entries classed as Division 4.3 (dangerous when wet) 
solids in Packing Groups II and III are amended by revising Column (8A) 
to authorize Sec. 173.151 as a packaging exception section. One 
commenter asked RSPA to authorize a packaging exception section for 
three additional Division 4.3 materials that exhibit similar 
characteristics and do not pose an unreasonable risk in transportation. 
After reviewing these materials, RSPA agrees and is adding them to the 
list of entries that are authorized a packaging exception in 
Sec. 173.151.
    Revisions to Classification and Hazard Zone Identification for 
Certain Materials Poisonous by Inhalation. Based on acute inhalation 
toxicity data and related information obtained by RSPA, the HMT is 
amended to change the hazard zone for some materials poisonous by 
inhalation, and to add other materials to the list of materials 
poisonous by inhalation. For certain materials this revision imposes 
more stringent hazard communication and packaging requirements. The 
Docket HM-181H NPRM contains a more complete description of the data on 
which these revisions are based. The materials are listed as follows:
    a. Hydrogen cyanide, solution in alcohol (with not more than 45 
percent hydrogen cyanide) (UN3294). Based on the toxicity and 
volatility of hydrogen cyanide, the packing group assigned and the 
dilution factor for this solution of hydrogen cyanide, RSPA is 
identifying hydrogen cyanide, solution in alcohol with not more than 45 
percent hydrogen cyanide as a Hazard Zone B inhalation hazard. A new 
special provision ``25'' is assigned to this entry to authorize a one-
year delay for compliance with new packaging requirements.
    b. Metal carbonyls, n.o.s. (UN3281). The acute toxicity of metal 
carbonyls may differ from one compound to another. Those toxic by 
inhalation may fall into Hazard Zone A or Hazard Zone B. Others may not 
be toxic by inhalation, but may exhibit oral and/or dermal toxicity, 
which places them in

[[Page 50618]]

Division 6.1, Packing Group I. Therefore, RSPA is adding special 
provision ``5'' to Column 7 of the entry for metal carbonyls, n.o.s. at 
the Packing Group I level.
    c. Methanesulfonyl chloride (UN3246). As proposed, RSPA is 
identifying methanesulfonyl chloride as a Hazard Zone B inhalation 
hazard. A new special provision ``25'' is assigned to this entry to 
authorize a one-year delay for compliance with new packaging 
requirements.
    d. Methyl vinyl ketone (UN1251). As proposed, RSPA is identifying 
methyl vinyl ketone as a Hazard Zone A inhalation hazard. Also, to be 
consistent with the UN Recommendations (Eighth revised edition), RSPA 
is adding the plus (+) symbol to Column 1 of the entry for methyl vinyl 
ketone. A new special provision ``25'' is assigned to this entry to 
authorize a one-year delay for compliance with new packaging 
requirements.
    e. Nitriles, toxic, flammable, n.o.s. (UN3275). This generic entry 
covers Division 6.1, Packing Groups I and II toxic, flammable nitriles 
that are not specifically listed by name but exhibit acute oral, dermal 
and/or inhalation toxicity. The acute toxicity of these nitriles may 
differ from one compound to another. Those toxic by inhalation may fall 
into Hazard Zone A or Hazard Zone B. Other nitriles may not be toxic by 
inhalation, but may exhibit oral and/or dermal toxicity which places 
them in Division 6.1, Packing Group I. Therefore, RSPA is adding 
special provision ``5'' to Column 7 of the entry for nitriles, toxic, 
flammable, n.o.s. at the Packing Group I level.
    f. Nitriles, toxic, n.o.s. (UN3276). This generic entry covers 
Division 6.1, Packing Groups I, II and III toxic nitriles that are not 
specifically listed by name but exhibit acute oral, dermal and/or 
inhalation toxicity. The acute toxicity of these nitriles may differ 
from one compound to another. Those toxic by inhalation may fall into 
Hazard Zone A or Hazard Zone B. Other nitriles may not be toxic by 
inhalation, but may exhibit oral and/or dermal toxicity which places 
them in Division 6.1, Packing Group I. Therefore, RSPA is adding 
special provision ``5'' to Column 7 of the entry for nitriles, toxic, 
n.o.s. at the Packing Group I level.
    g. Organoarsenic compound, n.o.s. (UN3280). This generic entry 
covers Division 6.1, Packing Groups I, II and III toxic organoarsenic 
compounds that are not specifically listed by name but exhibit acute 
oral, dermal and/or inhalation toxicity. The acute toxicity of these 
organoarsenic compounds may differ from one compound to another. Those 
toxic by inhalation may fall into Hazard Zone A or Hazard Zone B. 
Others may not be toxic by inhalation, but may exhibit oral and/or 
dermal toxicity which places them in Division 6.1, Packing Group I. 
Therefore, RSPA is adding special provision ``5'' to Column 7 of the 
entry for organoarsenic compound, n.o.s. at the Packing Group I level.
    h. Organophosphorus compound, toxic, flammable, n.o.s. (UN3279). 
This generic entry covers Division 6.1, Packing Groups I and II toxic, 
flammable organophosphorus compounds that are not specifically listed 
by name but may exhibit acute oral, dermal and/or inhalation toxicity. 
The acute toxicity of these organophosphorus compounds may differ from 
one compound to another. Those toxic by inhalation may fall into Hazard 
Zone A or Hazard Zone B. Others may not be toxic by inhalation, but may 
exhibit oral and/or dermal toxicity which places them in Division 6.1, 
Packing Group I. Therefore, RSPA is adding special provision ``5'' to 
Column 7 of the entry for organophosphorus compound, toxic, flammable, 
n.o.s. at the Packing Group I level.
    i. Organophosphorus compound, toxic, n.o.s. (UN3278). This generic 
entry covers Division 6.1, Packing Groups I, II and III toxic 
organophosphorus compounds that are not listed by name but exhibit 
acute oral, dermal and/or inhalation toxicity. The acute toxicity of 
these organophosphorus compounds may differ from one compound to 
another. Those toxic by inhalation may fall into Hazard Zone A or 
Hazard Zone B. Others may not be toxic by inhalation, but may exhibit 
oral and/or dermal toxicity which places them in Packing Group I. 
Therefore, RSPA is adding special provision ``5'' to Column 7 of this 
entry for organophosphorus compound, toxic, n.o.s. at the Packing Group 
I level.
    j. Phosphorus pentafluoride (UN2198). As proposed, RSPA is 
identifying phosphorus pentafluoride as a Hazard Zone B inhalation 
hazard.
    k. Tungsten hexafluoride (UN2196). As proposed, RSPA is identifying 
tungsten hexafluoride as a Hazard Zone B inhalation hazard.
    Section 172.102. As noted in the discussion on revisions for 
materials poisonous by inhalation, RSPA is authorizing a one-year delay 
for compliance with new packaging requirements by assigning a new 
special provision ``25'' to three commodities.
    Special Provision B59, which authorizes AAR 207A tank cars for 
phosphorus pentasulfide, is revised as proposed to reference the use of 
water-tight, sift-proof, closed-top, metal-covered hopper cars.
    A new special provision (N42) is added as proposed to authorize a 
UN 1A1 steel drum for stabilized benzyl chloride. One comment was 
received in response to this proposal and strongly supported the 
addition of N42, which allows use of phenolic-lined steel drums with a 
minimum thickness of 1.3 mm (0.050 inch) which have been tested and 
certified to a Packing Group I level at a specific gravity of 1.8. The 
commenter cited a history of shipping benzyl chloride in phenolic-lined 
17C and UN 1A1 steel drums since 1981 without incident and without 
failure of the phenolic lining.
    Section 172.302. In the general marking requirements for bulk 
packagings, markings on portable tanks with capacities of less than 
3,785 L (1,000 gallons) must be at least 6.0 mm (0.24 inch) wide and at 
least 25 mm (one inch) high. RSPA proposed a revision of paragraph 
(b)(2) to decrease to 4 mm (0.16 inch) the minimum width of markings 
required on portable tanks having a capacity less than 3,785 L (1,000 
gallons). RSPA also proposed reducing both the minimum height and width 
of markings required on IBCs to 25 mm (one inch). Commenters were 
uniformly supportive of both proposals, and they are adopted as 
proposed. RSPA is not adopting one commenter's recommendation to amend 
Appendix B to Subpart B of Part 107 to allow a marking height of one 
inch for certain small portable tanks authorized under an exemption.
    Section 172.504. RSPA is removing the second sentence of paragraph 
(f)(8) which allows a CLASS 9 placard to be substituted for a 
COMBUSTIBLE LIQUID placard for material meeting both Combustible liquid 
and Class 9 hazard classes. Several commenters agreed that this 
provision created potential confusion and misunderstanding between 
documentation and marking requirements describing a Combustible liquid 
and the application of CLASS 9 placards.

Part 173

    Section 173.24a. RSPA proposed to amend paragraph (a)(3) to clarify 
that cushioning material used to protect inner packagings must not be 
adversely affected (e.g., disintegrate) if there is leakage of a 
hazardous material from the inner packagings. A degradation of 
cushioning materials could significantly reduce the effectiveness of a 
packaging to a point that it would not conform with its marked 
performance standard

[[Page 50619]]

or meet general packaging requirements. This clarification is 
consistent with international air transport provisions contained in the 
International Civil Aviation Organization's (ICAO) Technical 
Instructions. Commenters supported this proposed revision; however, the 
Fibre Box Association expressed concern that the proposal might be 
interpreted to mean corrugated cushioning and corrugated packaging of 
liquids will not be allowed. The Fibre Box Association stated that the 
phrase ``having protective properties [significantly] impaired in event 
of leakage'' is too vague.
    The proposed change was not intended to preclude the use of 
fiberboard cushioning or packaging for liquids. Although there is no 
established criteria for evaluating degradation of cushioning material, 
RSPA agrees that the phrase ``significantly impaired'' should be 
revised. RSPA believes ``significantly weakened'' more accurately 
conveys the intent of this provision and is revising this phrase 
accordingly.
    Currently, paragraphs (b)(1) and (b)(2) provide filling limits for 
single and composite packagings, but no such limits are provided for 
combination packagings. As proposed, RSPA is revising paragraph (b)(2) 
of this section to prescribe filling limits for all non-bulk 
packagings, including combination packagings. This provision prohibits 
combination packagings from being filled with a hazardous material to a 
gross mass greater than the maximum gross mass marked on the packaging.
    Section 173.28. RSPA proposed adding a formula in paragraph (b)(4) 
for calculating an equivalent minimum thickness for stainless steel 
drums. This formula is consistent with the formula contained in 
Sec. 178.705 for calculating minimum wall thicknesses for metal IBCs. 
The Association of Container Reconditioners (ACR) opposed this proposed 
change and stated that this issue is too complex for adoption at this 
time. ACR believes that by reducing the minimum thickness of stainless 
steel to the equivalent strength of carbon steel, the rationale for 
waiving leakproofness testing for stronger steel is eliminated. ACR 
requested that, if this proposal is adopted, a drum manufacturer's use 
of this equivalence formula be communicated through a particular unique 
mark, thus advising persons responsible for reuse or reconditioning of 
this equivalence formula being used.
    RSPA is confident that the equivalence formula adopted in this 
final rule provides an equivalent level of safety and drum integrity. 
The language in the paragraph (b)(7) leakproofness testing waiver for 
stainless steel drums requires a thickness of one and one-half times 
the thickness prescribed for reuse, thus precluding use of any thinner 
drums.
    An adjustment to Footnote 1, which specifies a minimum thickness of 
0.82 mm body and 1.11 mm head and corresponds with ISO 3574, is adopted 
as proposed. Commenters supporting this proposed change included ACR, 
several chemical manufacturing companies, the Association of Waste 
Hazardous Materials Transporters, and a drum manufacturer. Two 
commenters, a different drum manufacturer and the Steel Shipping 
Container Institute (SSCI), opposed this proposal, stating that this 
request from ACR was driven by economic considerations, not safety. 
SSCI claimed that technology for determining minimum thicknesses is 
readily available. The drum manufacturer opposing this change stated 
that if the footnote adjustment was adopted as proposed, RSPA should 
provide a transition period for drum manufacturers to deplete their 
inventory of material rendered obsolete by this change.
    RSPA is making this adjustment to Footnote 1 to standardize minimum 
thickness requirements with breakpoints commonly recognized by 
international standards, not to provide any economic benefit to 
industry. RSPA also is revising Footnote 1 to authorize metal drums or 
jerricans constructed with a minimum thickness of 0.82 mm body and 1.09 
mm heads until December 31, 1996. After that date, drums must be 
constructed with heads meeting a minimum thickness of 1.11 mm. This 
delay will provide drum manufacturers additional time to deplete 
existing inventory and build an inventory of new material.
    Paragraph (b)(7)(iv)(C) is revised as proposed to clarify that 
there are established conditions which must be met before an approval 
is granted by the Associate Administrator for Hazardous Materials 
Safety to allow relief from leakproofness testing for a packaging 
constructed of a material or thickness not otherwise authorized in the 
exception.
    Paragraph (c)(2) prescribes reconditioning requirements for non-
bulk packagings other than metal drums. In the NPRM, RSPA proposed a 
revision to this paragraph to clarify that repairing or replacing a 
bung or removable gasket in a plastic closed head (UN 1H1) drum is not 
considered reconditioning. Both SSCI and ACR opposed this proposed 
change, stating that replacing gaskets or closures on a plastic drum is 
plastic drum reconditioning. SSCI claimed that a change in the material 
of a drum is reconditioning or remanufacturing, and that changing 
location, type or size of gasket material or properties affecting the 
performance of the gasket is considered design type changes requiring 
complete design qualification testing. The SSCI also warned that this 
proposal downplays the significance of gaskets in minimizing leaks and 
will shift drum purchases from steel to plastic drums to save costs in 
reconditioning and leaktesting. In RSPA's view, simply ``replacing'' a 
bung or gasket in a plastic closed head drum is not reconditioning. In 
this final rule, RSPA is clarifying in paragraph (c)(2) that repair or 
replacement of a bung or a removable gasket in a plastic closed head 
(UN 1H1) drum with a bung or gasket that is of the same design and 
material as the original bung or gasket, and provides equivalent 
performance, is not considered reconditioning and does not subject the 
drum to reconditioning marking requirements or to leakproofness testing 
requirements if it is otherwise excepted from leakproofness testing.
    Section 173.32. As proposed, RSPA is reinstating pressure testing 
requirements for DOT 57 portable tanks in paragraph (e)(2)(i). RSPA 
also is amending paragraph (d) to allow plastic discharge valves for 
certain stainless steel DOT 57 tanks constructed before October 1, 
1996. Allowing a plastic discharge valve on these tanks eliminates the 
need for an existing exemption, DOT-E-10916, and permits continued use 
of thousands of portable tanks with a proven safety record. Two 
comments were received in response to the proposal, both supporting 
revisions to this section.
    RSPA is adding a new paragraph (t) which allows the remarking of 
certain portable tanks currently authorized under DOT exemptions as DOT 
51 portable tanks. These portable tanks were in full conformance with 
the requirements for DOT 51 portable tanks, including the ASME Code 
``U'' stamp, except for the location of fill and discharge outlets.
    The changes adopted in this final rule relating to the location of 
outlets on DOT 51 portable tanks will allow for the elimination of 
numerous exemptions based on the design and excellent safety record of 
these portable tanks. RSPA believes that as a minimum, the following 
exemptions will be affected:

DOT-E 6518
DOT-E 8196
DOT-E 9401
DOT-E 9402

[[Page 50620]]

DOT-E 9632
DOT-E 9718
DOT-E 10032
DOT-E 10171
DOT-E 10193
DOT-E 10291
DOT-E 10567
DOT-E 11239
DOT-E 11275
DOT-E 11313
DOT-E 11331
DOT-E 11539
DOT-E 11589
DOT-E 11604
DOT-E 11658
DOT-E 11661

    Persons holding other exemptions which they believe are impacted by 
changes adopted by this final rule should contact RSPA.
    Section 173.115. Paragraph (b)(1) is revised as proposed to reflect 
the correct conversion of 280 kPa to read ``280 kPa (40.6 psia)'' for 
informational purposes.
    Section 173.120 and Appendix H to Part 173. Based on requests from 
industry and comments supporting this proposed revision, RSPA is adding 
a new paragraph (b)(3) to specify a procedure for testing combustible 
liquids with a flash point above 60.5 deg. C (141 deg. F) and below 
93 deg.C (200 deg. F) for the ability to sustain combustion. Appendix H 
to Part 173 is revised to provide additional test temperatures in 
paragraph 5.(h) for combustible liquids that closely parallel the 
approach for flammable liquids.
    Sections 173.121, 173.125, and 173.127. As proposed, RSPA is 
adopting a clarification of the methods for determining packing groups 
described in Secs. 173.121(a), 173.125(a), and 173.127(b) for Class 3, 
Class 4, and Class 5 materials, respectively.
    Section 173.133. RSPA is revising as proposed the wording ``more 
than one packing group and hazard zone'' in paragraph (b)(1) to read 
``more than one packing group or hazard zone''. One commenter expressed 
support for the proposed change, stating that it will clarify the 
determination of applicable packing groups.
    Section 173.134. Paragraph (a)(4) limits the definition of 
regulated medical waste to exclude discarded cultures and stocks of 
infectious substances. In this final rule, paragraph (b) is revised as 
proposed by adding a new paragraph (b)(4) authorizing discarded 
cultures and stocks in Biosafety Levels 1, 2 and 3, as defined in HHS 
Publication No. (CDC) 93-8395, Biosafety in Microbiological and 
Biomedical Laboratories, 3rd Edition, May 1993, Section II to be 
described and packaged as regulated medical waste rather than 
infectious substances. Packagings must conform to Packing Group II 
performance requirements. Transport of these materials is limited to 
private or contract motor freight carriers in dedicated service to the 
transportation of medical waste. Commenters uniformly supported this 
proposed change. One commenter referenced a recent Center for Disease 
Control proposed list of infectious substances capable of causing 
substantial harm to human health. This commenter believed all discarded 
cultures and stocks of infectious substances not on this proposed list 
should be eligible for regulation as regulated medical waste. Another 
commenter believed RSPA should provide even more relief for these 
materials by allowing them to be packaged in OSHA-authorized containers 
conforming to DOT's general packaging standards, and also should allow 
private carriers transporting these types of cultures and stocks to 
backhaul non-food products if trailers are properly disinfected. It is 
RSPA's view that these suggested changes are beyond the scope of this 
rulemaking.
    Section 173.151. A new paragraph (d) is added as proposed to 
incorporate limited quantity provisions for Division 4.3 (dangerous 
when wet) solid materials in Packing Groups II and III. This amendment 
aligns the HMR with limited quantity exceptions contained in the UN 
Recommendations.
    Section 173.156. Paragraph (b)(2) is revised as proposed to remove 
the 30 kg (66 pounds) weight restriction for ORM-D materials packaged 
in ``display packs'' which are offered for transportation, or 
transported, by highway or rail between a manufacturer, a distribution 
center, and a retail outlet. These display packs are inner receptacles 
of ORM-D materials which are secured in corrugated fiberboard trays and 
then stacked and placed within a strong outer container. Each outer 
container is strapped to a wooden pallet with steel or polyester 
strapping to form an integral part of the packaging. All commenters 
addressing this issue supported the proposal; however, several 
commenters requested that the net weight of each display pack be raised 
from 250 kg (550 pounds) to 525 kg (1155 pounds) to reflect the weight 
limit authorized in an exemption recently granted for this type of 
packaging. RSPA believes that display packs should be limited to 250 kg 
(550 pounds) net weight until satisfactory experience is gained under 
the exemption at the higher weight.
    RSPA proposed an exception for transportation of ORM-D materials to 
disposal facilities in paragraph (b)(1) to allow discarded consumer 
commodities to be transported from manufacturing, distribution or 
retail facilities to a disposal facility when packaged in large boxes 
or overpacks exceeding 30 kg (66 pounds). RSPA received comments 
supporting this proposal from The Conference on the Safe Transportation 
of Hazardous Articles (petitioner for this change) and the National 
Wholesale Druggists' Association. The Association of Waste Hazardous 
Materials Transporters opposed the proposal, stating it has the 
potential for abuse. This commenter believed the proposal was not in 
the public interest and will create confusion about the regulatory 
status of discarded material, which may be subject to regulation as 
either a solid waste or hazardous waste.
    RSPA does not agree. However, based on further review of this 
proposal, RSPA is revising the proposed provision to require that the 
transportation of discarded consumer commodities to a disposal facility 
must be from a single point of origin. RSPA believes that limiting the 
consolidation of discarded consumer commodities in one shipping unit 
from one offeror establishes an appropriate condition for such 
transportation, taking into account other requirements such as 
Secs. 173.24 and 173.24a.
    Section 173.158. Paragraph (d) is revised as proposed to authorize 
additional packagings for nitric acid in concentrations of 90 percent 
or greater when offered for transportation or transported by rail, 
highway or water. A combination packaging consisting of a 1A2, 1B2, 1D, 
1G, 1H2, 3H2 or 4G outer packaging with inner glass packagings of 2.5 L 
(0.66 gallons) or less capacity cushioned with a non-reactive, 
absorbent material and packed within a leak-tight packaging of metal or 
plastic is authorized.
    In addition, RSPA is revising paragraph (f)(1) as proposed to 
authorize 6HH1 and 6HA1 composite packagings with PFA Teflon inner 
receptacles for nitric acid concentrations of 70 percent or less. These 
composite packagings are authorized under the provisions of three 
exemptions and have demonstrated an equivalent level of safety.
    Section 173.170. RSPA is adding a new non-bulk packaging section 
for black powder for small arms when transported domestically and 
reclassed as Division 4.1. For consistency with comparable provisions 
for smokeless powder for small arms, RSPA is revising approval 
procedures as proposed in the NPRM by requiring that black powder must 
be examined and approved for Division 4.1 classification and the

[[Page 50621]]

complete package must be of the same type as that approved under 
Sec. 173.56.
    Section 173.183. As proposed, RSPA is adding a packaging 
authorization to allow the use of polypropylene inner packagings for 
nitrocellulose base film.
    Section 173.225. Paragraph (a) is amended as proposed to specify 
that inner plastic packagings of a combination packaging used for 
transporting organic peroxides must be constructed of new resin. The 
one commenter responding to this proposal, the Organic Peroxide 
Producers Safety Division of the Society of the Plastics Industry, 
petitioned for the change. RSPA agrees with the commenter that most 
regulated organic peroxides are too sensitive to contamination to be 
stored in packages manufactured from ``resin of unknown history.''
    Section 173.306. Paragraph (i)(1) is removed as proposed and 
paragraphs (i)(2) through (i)(4) are redesignated accordingly as 
paragraphs (i)(1) through (i)(3). In addition, RSPA is revising the 
introductory text of paragraph (i) to clarify that flammability of 
aerosols is based on obtaining a positive test result from any of the 
three methods contained in this paragraph. This approach is consistent 
with the ICAO Technical Instructions.
    Section 173.314. RSPA is adopting a seasonal filling limit for tank 
cars containing anhydrous ammonia and liquefied petroleum gas based on 
winter filling reference temperatures of 29 deg.C (85 deg.F), 32 deg.C 
(90 deg.F), and 38 deg.C (100 deg.F), for insulated tanks, thermally-
protected and jacketed tanks, and noninsulated tanks, respectively. 
These filling limits would authorize a winter filling limit greater 
than that authorized in the HM-181 final rule. RSPA believes that these 
filling limits will ensure safety in transit while providing economic 
relief from the requirements adopted in the HM-181 final rule. 
Commenters uniformly supported this proposed change. The National 
Industrial Transportation League stated this change strikes an 
appropriate balance between safety and efficiency by avoiding the 
necessity for increasing the number of tank car shipments (and 
corresponding risk of spills) in winter months to achieve the same 
overall volume. The National Propane Gas Association also supported 
this proposal for tank cars and indicated its intent to submit a 
proposal to RSPA later this year for adoption of seasonal filling 
limits for cargo tanks.

Part 178

    Sections 178.245 and 178.245-1. RSPA is making several editorial 
changes for clarity and one significant change to allow DOT 
Specification 51 portable tanks to have openings at locations other 
than the top or one end of the tank under certain circumstances. 
Commenters supported the proposal to allow bottom outlets on tank 
containers, citing safety and economic benefits.
    Section 178.245-4. As proposed, RSPA is adding a new paragraph (e) 
to require that a DOT 51 portable tank in an ISO framework for 
containerized transportation must meet the requirements specified in 49 
CFR Parts 450-453.
    Section 178.245-6. The first sentence of paragraph (a) is amended 
as proposed to require the nameplate to be in close proximity to the 
ASME plate.
    Section 178.270-12. RSPA is amending paragraph (a) as proposed to 
notify manufacturers, owners and approval agencies of the requirements 
for the number and type of closures required for filling and discharge 
connections located below the normal liquid level of IM portable tanks.
    Section 178.601. Paragraph (g)(8) is added to list changes in one 
or more design elements which would constitute a different drum design 
type. Commenters supported the addition of this paragraph, but 
recommended revisions to be consistent with an approval issued to SSCI. 
RSPA agrees and is revising these provisions accordingly.
    Section 178.705. As proposed, a correction is made to the constant 
in the equivalence thickness formula for U.S. Standard Units in 
paragraph (c)(1)(iv)(B) to ensure that the resulting thickness is in 
inches.
    Paragraph (c)(2) of this section specifies pressure relief devices 
for metal IBCs. RSPA proposed adding a new sentence in paragraph 
(c)(2)(ii) to clarify that the specified start-to-discharge pressure 
requirements do not apply to fusible links unless these links are the 
sole source of pressure relief for the IBC. RSPA's proposal did not 
change any existing UN requirements, but simply clarified that the 
start-to discharge pressure requirements in 178.705(c)(2)(ii) did not 
apply to fusible devices if such devices are used in addition to other 
venting devices. If fusible devices are the sole means for providing 
venting relief capacity, an IBC marked ``31A'' must not exceed 65 kPa 
(9 psig) at the fusible device operating temperature.
    Several commenters requested that RSPA not adopt this amendment as 
proposed. It appears commenters are requesting an exception from start-
to-discharge pressure requirements when fusible devices are the sole 
means of pressure relief capacity. This exception would not be 
consistent with pressure relief requirements for IBCs in the UN 
Recommendations. The UN Recommendations specify pressure relief 
capabilities for an IBC regardless of the type of pressure relief 
device utilized. To maintain international consistency, such an 
exception should first be proposed and adopted in the UN 
Recommendations.
    RSPA is adopting this amendment in paragraph (c)(2)(ii) essentially 
as proposed, but is replacing the phrase ``fusible links'' with 
``fusible devices'' to more accurately describe these devices. This 
revision is based on a comment by the Rigid Intermediate Bulk Container 
Association.

IV. Rulemaking Analyses and Notices

A. Executive Order 12866 and DOT Regulatory Policies and Procedures

    This final rule is not considered a significant regulatory action 
under section 3(f) of Executive Order 12866 and therefore, was not 
reviewed by the Office of Management and Budget. The rule is not 
considered a significant rule under the Regulatory Policies and 
Procedures of the Department of Transportation [44 FR 11034].
    The economic impact of this final rule is expected to result in 
only minimal costs to certain persons subject to the HMR and may result 
in modest cost savings to a small number of persons subject to the HMR 
and to the agency. Because of the minimal economic impact of this rule, 
preparation of a regulatory impact analysis or a regulatory evaluation 
is not warranted.

B. Executive Order 12612

    This final rule has been analyzed in accordance with the principles 
and criteria contained in Executive Order 12612 (``Federalism''). 
Federal law expressly preempts State, local, and Indian tribe 
requirements applicable to the transportation of hazardous material 
that cover certain subjects and are not substantively the same as 
Federal requirements. 49 U.S.C. 5125(b)(1). These subjects are:
    (1) The designation, description, and classification of hazardous 
material;
    (2) The packing, repacking, handling, labeling, marking, and 
placarding of hazardous material;
    (3) The preparation, execution, and use of shipping documents 
pertaining to hazardous material, and requirements respecting the 
number, content, and placement of such documents;
    (4) The written notification, recording, and reporting of the 
unintentional release in transportation of hazardous material; or
    (5) The design, manufacturing, fabrication, marking, maintenance,

[[Page 50622]]

reconditioning, repairing, or testing of a package or container which 
is represented, marked, certified, or sold as qualified for use in the 
transportation of hazardous material.
    This final rule preempts State, local, or Indian tribe requirements 
concerning these subjects unless the non-Federal requirements are 
``substantively the same'' (see 49 CFR 107.202(d) as the Federal 
requirements.
    Federal law (49 U.S.C. 5125(b)(2)) provides that if DOT issues a 
regulation concerning any of the covered subjects, DOT must determine 
and publish in the Federal Register the effective date of Federal 
preemption. The effective date may not be earlier than the 90th day 
following the date of issuance of the final rule and not later than two 
years after the date of issuance. RSPA has determined that the 
effective date of Federal preemption for these requirements will be 
January 1, 1997. Thus, RSPA lacks discretion in this area, and 
preparation of a federalism assessment is not warranted.

C. Regulatory Flexibility Act

    This final rule responds to petitions for rulemaking. It is 
intended to provide clarification of the regulations and relax certain 
requirements. Therefore, I certify that this final rule will not have a 
significant economic impact on a substantial number of small entities.

D. Paperwork Reduction Act

    There are no new information collection requirements in this final 
rule.

E. Regulation Identifier Number (RIN)

    A regulation identifier number (RIN) is assigned to each regulatory 
action listed in the Unified Agenda of Federal Regulations. The 
Regulatory Information Service Center publishes the Unified Agenda in 
April and October of each year. The RIN number contained in the heading 
of this document can be used to cross-reference this action with the 
Unified Agenda.

List of Subjects

49 CFR Part 171

    Exports, Hazardous materials transportation, Hazardous waste, 
Imports, Incorporation by reference, Reporting and recordkeeping 
requirements.

49 CFR Part 172

    Hazardous materials transportation, Hazardous waste, Labels, 
Markings, Packaging and containers, Reporting and recordkeeping 
requirements.

49 CFR Part 173

    Hazardous materials transportation, Packaging and containers, 
Radioactive materials, Reporting and recordkeeping requirements, 
Uranium.

49 CFR Part 178

    Hazardous materials transportation, Motor vehicle safety, Packaging 
and containers, Reporting and recordkeeping requirements.

    In consideration of the foregoing, 49 CFR Chapter I is amended as 
follows:

PART 171--GENERAL INFORMATION, REGULATIONS, AND DEFINITIONS

    1. The authority citation for Part 171 continues to read as 
follows:

    Authority: 49 U.S.C. 5101-5127; 49 CFR 1.53.

    2. In the Sec. 171.7(a)(3) Table, three new entries are added in 
alphabetical order to read as follows:

Sec. 171.7  Reference material.

    (a) Matter incorporated by reference * * *
    (3) Table of material incorporated by reference. * * *

------------------------------------------------------------------------
                                                                49 CFR  
                Source and name of material                   reference 
------------------------------------------------------------------------
                                                                        
*                  *                  *                  *              
         American Society for Testing and Materials                     
                                                                        
*                  *                  *                  *              
         *                  *                  *                        
    ASTM A 366/A 366M-91 (1993)e1 Standard Specification                
     for Steel, Sheet, Carbon, Cold-Rolled, Commercial                  
     Quality...............................................      178.601
*                  *                  *                  *              
         *                  *                  *                        
    ASTM A 568/A 568M-95 Standard Specification for Steel,              
     Sheet, Carbon, and High-Strength, Low-Alloy, Hot-                  
     Rolled and Cold-Rolled, General Requirements for......      178.601
*                  *                  *                  *              
         *                  *                  *                        
                                                                        
                 Health and Human Services                              
    Centers for Disease Control and Prevention, 1600                    
     Clifton Road N.E., Atlanta GA 30333...................             
    Also available from: Superintendent of Documents,                   
     Government Printing Office (GPO), HHS Publication No.              
     (CDC) 93-8395, Biosafety in Microbiological and                    
     Biomedical Laboratories, 3rd Edition, May 1993,                    
     Section II............................................      173.134
*                  *                  *                  *              
         *                  *                  *                        
------------------------------------------------------------------------

* * * * *
    3. In Sec. 171.14, as amended at 61 FR 7959, effective October 1, 
1996, paragraph (a) introductory text through paragraph (a)(2)(i) and 
paragraph (b) are removed, paragraphs (a)(2)(ii) and (a)(2)(iii) are 
redesignated as paragraphs (b) and (c) and a new paragraph (a) is added 
to read as follows:

Sec. 171.14  Transitional provisions for implementing requirements 
based on the UN Recommendations.

* * * * *
    (a) Previously filled packages--(1) Packages filled prior to 
October 1, 1991. Notwithstanding the marking and labeling provisions of 
subparts D and E, respectively, of part 172, and the packaging 
provisions of part 173 and subpart B of Part 172 of this subchapter, a 
package may be offered for transportation and transported prior to 
October 1, 2001, if it--
    (i) Conforms to the old requirements of this subchapter in effect 
on September 30, 1991;
    (ii) Was filled with a hazardous material prior to October 1, 1991;
    (iii) Is marked ``Inhalation Hazard'' if appropriate, in accordance 
with Sec. 172.313 of this subchapter or Special Provision 13, as 
assigned in the Sec. 172.101 Table; and

[[Page 50623]]

    (iv) Is not emptied and refilled on or after October 1, 1991.
    (2) Non-bulk packages filled prior to October 1, 1996. 
Notwithstanding the packaging provisions of subpart B of Part 172 and 
the packaging provisions of part 173 of this subchapter with respect to 
UN standard packagings, a non-bulk package other than a cylinder may be 
offered for transportation and transported domestically prior to 
October 1, 1999, if it--
    (i) Conforms to the requirements of this subchapter in effect on 
September 30, 1996;
    (ii) Was filled with a hazardous material prior to October 1, 1996; 
and
    (iii) Is not emptied and refilled on or after October 1, 1996.
* * * * *

PART 172--HAZARDOUS MATERIALS TABLE, SPECIAL PROVISIONS, HAZARDOUS 
MATERIALS COMMUNICATIONS, EMERGENCY RESPONSE INFORMATION, AND 
TRAINING REQUIREMENTS

    4. The authority citation for Part 172 continues to read as 
follows:

    Authority: 49 U.S.C. 5101-5127; 49 CFR 1.53.

    5. In Sec. 172.101, a new paragraph (c)(10)(iii) is added to read 
as follows:

Sec. 172.101  Purpose and use of hazardous materials table.

* * * * *
    (c) * * *
    (10) * * *
    (iii) A mixture or solution not identified in the Table by a 
specific description, comprised of two or more hazardous materials in 
the same hazard class, shall be described using an appropriate shipping 
description (e.g., ``Flammable liquid, n.o.s.''). Some mixtures may be 
more appropriately described according to their application, such as 
``Coating solution'' or ``Extracts, flavoring liquid'' rather than by 
an n.o.s. entry. Under the provisions of subparts C and D of this part, 
the technical names of at least two components most predominately 
contributing to the hazards of the mixture or solution may be required 
in association with the proper shipping name.
* * * * *

Sec. 172.101  [Amended]

    6. In addition, in Sec. 172.101, in paragraph (c)(12), the 
following changes are made:
    a. In paragraph (c)(12)(ii), in the last sentence, the wording 
``technical name of the constituent'' is revised to read ``technical 
name of one or more constituents''.
    b. In paragraph (c)(12)(iii), in the first sentence, the wording 
``by a specific description,'' is revised to read ``specifically by 
name (e.g., acetyl chloride),''.
    7. In Sec. 172.101, the Hazardous Materials Table, as amended at 61 
FR 18932 and 61 FR 27172 effective October 1, 1996, is amended by 
adding in alphabetical order or revising the following entries to read 
as follows:

Sec. 172.101  Purpose and use of hazardous materials table.

* * * * *

                                                                            Sec.  172.101  Hazardous Materials Table                                                                            
                                                                                                                                                                                                
                 Hazardous                                                                              (8)  Packaging (Sec.  173.***)      (9)  Quantity  limitations      (10) Vessel  stowage
                 materials       Hazard                                                              -------------------------------------------------------------------------------------------
  Symbols    descriptions and   class or    Identification      PG     Label codes       Special                                                                                                
              proper shipping   Division         Nos.                                  provisions     Exceptions   Non-bulk     Bulk        Passenger      Cargo aircraft   location     Other  
                   names                                                                                                                  aircraft/rail         only                            
(1)          (2).............        (3)   (4)                    (5)  (6)........  (7).............  (8A)......       (8B)  (8C)......  (9A)...........  (9B)...........      (10A)       (10B)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                           *                   *                   *                   *                   *                   *                   *                                            
             [ADD:]                                                                                                                                                                             
D            Black powder for        4.1   NA0027                   I  4.1........  70..............  None......        170  None......  Forbidden......  Forbidden......          E            
              small arms.                                                                                                                                                                       
                           *                   *                   *                   *                   *                   *                   *                                            
             [REVISE:]                                                                                                                                                                          
             Hydrogen                6.1   UN3294                   I  6.1, 3.....  2,25,B9,          None......        227  244.......  Forbidden......  Forbidden......          D          40
              cyanide,                                                               B14,B32, B74,                                                                                              
              solution in                                                            T38, T43,T45.                                                                                              
              alcohol with                                                                                                                                                                      
              not more than                                                                                                                                                                     
              45 percent                                                                                                                                                                        
              hydrogen                                                                                                                                                                          
              cyanide.                                                                                                                                                                          
                                                                                                                                                                                                
                                                                                                                                                                                                
                           *                   *                   *                   *                   *                   *                   *                                            
             Methanesulfonyl         6.1   UN3246                   I  6.1, 8.....  2,25, B9,         None......        227  244.......  Forbidden......  Forbidden......          D          40
              chloride.                                                              B14,B32, B74,                                                                                              
                                                                                     T38, T43, T45.                                                                                             
                           *                   *                   *                   *                   *                   *                   *                                            
+            Methyl vinyl              3   UN1251                  II  3, 6.1.....  1,25,B9,          None......        226  244.......  Forbidden......  Forbidden......          B          40
              ketone.                                                                B14,B30,                                                                                                   
                                                                                     B72,T38, T43,                                                                                              
                                                                                     T44.                                                                                                       
                           *                   *                   *                   *                   *                   *                   *                                            

Sec. 172.101  [Amended]

    8. In addition, in Sec. 172.101, in the Hazardous Materials Table, 
the following changes are made:
    a. For the entry ``Benzyl chloride'', in column (7), Special 
Provision ``N43'' is revised to read ``N42''.
    b. For the entry ``Chlorosilanes, corrosive, flammable, n.o.s.'', 
in Column (7), Special Provisions ``,T18, T26'' are added following 
``B100''.
    c. For the entry ``Chlorosilanes, corrosive, nos.'', in Column (7), 
Special Provisions, ``T8, T26'' are added following ``B2''.
    d. For the entry, ``Chlorosilanes, water-reactive, flammable, 
corrosive, n.o.s.'', in Column (7), Special Provisions ``,T24, T26'' 
are added following ``A2''.
    e. For the entries ``Organic peroxide type F, liquid, temperature 
controlled'' and ``Organic peroxide type F, solid, temperature 
controlled'', in Column (8A), the reference ``225'' is removed each 
place it appears and ``None'' added in each place, and in Column (8C), 
the

[[Page 50624]]

reference ``None'' is removed each place it appears and ``225'' added 
in each place.
    f. For the entry ``Organic peroxide type F, solid'', in Column 
(8C), the reference ``None'' is removed and ``225'' is added in its 
place.
    g. For the entry ``Phosphorus pentafluoride'', in Column (7), the 
wording ``1'' is removed and ``2, B9, B14'' is added in its place; in 
Column (8B) ``302'' is revised to read ``302, 304''; and in Column 
(8C), ``None'' is revised to read ``314, 315''.
    h. For the entry ``Tungsten hexafluoride'', in Column (7), special 
provision ``3'' is revised to read ``2''.
    i. For the entries ``Metal carbonyls, n.o.s., UN3281, PG I''; 
``Nitriles, toxic, flammable, n.o.s., UN3275, PG I''; ``Nitriles, 
toxic, n.o.s., UN3276, PG I''; ``Organoarsenic compound, n.o.s., 
UN3280, PG I''; ``Organophosphorus compound, toxic, flammable, n.o.s., 
UN3279, PG I''; and ``Organophosphorus compound, toxic, n.o.s., UN3278, 
PG I'', in Column (7), Special Provision ``5'' is added.
    j. For each of the following entries, in Column (8A), the word 
``None'' is removed and ``151'' added in its place:

Alkali metal amides
Alkaline earth metal alloys, n.o.s.
Aluminum carbide
Aluminum ferrosilicon powder (both entries)
Aluminum powder, uncoated (both entries)
Aluminum processing by-products (both entries)
Aluminum silicon powder, uncoated
Barium
Calcium
Calcium carbide, in PG II
Calcium cyanamide with more than 0.1 percent of calcium carbide
Calcium manganese silicon
Calcium silicide (both entries)
Cerium, turnings or gritty powder
Ferrosilicon with 30 percent or more but less than 90 percent silicon
Lithium ferrosilicon
Lithium hydride, fused solid
Lithium silicon
Magnesium granules, coated particle size not less than 149 microns
Magnesium powder or Magnesium alloys, powder
Magnesium silicide
Maneb stabilized or Maneb preparations, stabilized against self-heating
Metal hydrides, water-reactive, n.o.s., in PG II
Metallic substance, water-reactive, n.o.s., in PG II and III
Phosphorous pentasulfide, free from yellow or white phosphorous
Sodium aluminum hydride
Water-reactive solid, corrosive, n.o.s., in PG II and III
Water-reactive solid, flammable, n.o.s., in PG II and III
Water-reactive solid, n.o.s., in PG II and III
Water-reactive solid, toxic, n.o.s., in PG II and III
Zinc ashes

    9. In Sec. 172.102, in paragraph (c)(1) Special Provisions 25 and 
70 are added, in paragraph (c)(3) Special Provision B59 is revised, and 
in paragraph (c)(5), Special Provision N42 is added, to read as 
follows:

Sec. 172.102  Special provisions.

* * * * *
    (c) * * *
    (1) * * *
* * * * *
    25  Until October 1, 1997, this material may be transported or 
offered for transportation in a packaging authorized under the 
regulations in effect on September 30, 1996.
* * * * *
    70  Black powder that has been classed in accordance with the 
requirements of Sec. 173.56 of this subchapter may be reclassed and 
offered for domestic transportation as a Division 4.1 material if it 
is offered for transportation and transported in accordance with the 
limitations and packaging requirements of Sec. 173.170 of this 
subchapter.
* * * * *
    (3) * * *
* * * * *
    B59  Water-tight, sift-proof, closed-top, metal-covered hopper 
cars are also authorized provided that the lading is covered with a 
nitrogen blanket.
* * * * *
    (5) * * *
* * * * *
    N42  1A1 drums made of carbon steel with thickness of body and 
heads of not less than 1.3 mm (0.050 inch) and with a corrosion-
resistant phenolic lining are authorized for stabilized benzyl 
chloride if tested and certified to the Packing Group I performance 
level at a specific gravity of not less than 1.8.
* * * * *
    10. In Sec. 172.302, paragraph (b) is revised to read as follows:

Sec. 172.302  General marking requirements for bulk packagings.

* * * * *
    (b) Size of markings. Except as otherwise provided, markings 
required by this subpart on bulk packagings must--
    (1) Have a width of at least 6.0 mm (0.24 inch) and a height of at 
least 100 mm (3.9 inches) for rail cars;
    (2) Have a width of at least 4.0 mm (0.16 inch) and a height of at 
least 25 mm (one inch) for portable tanks with capacities of less than 
3,785 L (1,000 gallons) and intermediate bulk containers; and
    (3) Have a width of at least 6.0 mm (0.24 inch) and a height of at 
least 50 mm (2.0 inches) for cargo tanks and other bulk packagings.
* * * * *

Sec. 172.504  [Amended]

    11. In Sec. 172.504, the last sentence of paragraph (f)(8) is 
removed.

PART 173--SHIPPERS--GENERAL REQUIREMENTS FOR SHIPMENTS AND 
PACKAGINGS

    12. The authority citation for Part 173 continues to read as 
follows:

    Authority: 49 U.S.C. 5102-5127; 49 CFR 1.53.

    13. In Sec. 173.24a, the last sentence of paragraph (a)(3) and 
paragraph (b)(2) are revised, to read as follows:

Sec. 173.24a  Additional general requirements for non-bulk packagings 
and packages.

    (a) * * *
    (3) * * * Cushioning material must not be capable of reacting 
dangerously with the contents of the inner packagings or having its 
protective properties significantly weakened in the event of leakage.
* * * * *
    (b) * * *
    (2) Except as otherwise provided in this section, a non-bulk 
packaging may not be filled with a hazardous material to a gross mass 
greater than the maximum gross mass marked on the packaging.
* * * * *

Sec. 173.24b  [Amended]

    14. In Sec. 173.24b, in the first sentence in paragraph (b), the 
wording ``stainless steel is steel'' is revised to read ``the reference 
stainless steel is stainless steel''.
    15. In Sec. 173.28, paragraphs (b)(4) and (b)(7)(iv)(C) are revised 
and a new sentence is added in paragraph (c)(2) following the first 
sentence, to read as follows:

Sec. 173.28  Reuse, reconditioning and remanufacture of packagings.

* * * * *
    (b) * * *
    (4) Metal and plastic drums and jerricans used as single packagings 
or the outer packagings of composite packagings are authorized for 
reuse only when they are marked in a permanent manner (e.g., embossed) 
in millimeters with the nominal (for metal packagings) or minimum (for 
plastic packagings)

[[Page 50625]]

thickness of the packaging material, as required by Sec. 178.503(a)(9) 
of this subchapter, and--
    (i) Except as provided in paragraph (b)(4)(ii) of this section, 
conform to the following minimum thickness criteria:

------------------------------------------------------------------------
                            Minimum thickness of packaging material     
 Maximum capacity not --------------------------------------------------
         over                                        Plastic drum or    
                        Metal drum or jerrican           jerrican       
------------------------------------------------------------------------
20 L.................  0.63 mm (0.025 inch)....  1.1 mm (0.043 inch).   
30 L.................  0.73 mm (0.029 inch)....  1.1 mm (0.043 inch).   
40 L.................  0.73 mm (0.029 inch)....  1.8 mm (0.071 inch).   
60 L.................  0.92 mm (0.036 inch)....  1.8 mm (0.071 inch).   
120 L................  0.92 mm (0.036 inch)....  2.2 mm (0.087 inch).   
220 L................  0.92 mm (0.036 inch) 1..  2.2 mm (0.087 inch).   
450 L................  1.77 mm (0.070 inch)....  5.0 mm (0.197 inch).   
------------------------------------------------------------------------
\1\ Metal drums or jerricans constructed with a minimum thickness of    
  0.82 mm body and 1.09 mm heads are authorized until December 31, 1996.
  After that date, metal drums or jerricans constructed with a minimum  
  thickness of 0.82 mm body and 1.11 heads are authorized.              

    (ii) For stainless steel drums and jerricans, conform to a minimum 
wall thickness as determined by the following equivalence formula:

Formula for Metric Units
[GRAPHIC] [TIFF OMITTED] TR26SE96.023

Formula for U.S. Standard Units
[GRAPHIC] [TIFF OMITTED] TR26SE96.024

where:
e1=required equivalent wall thickness of the metal to be used (in 
mm or, for U.S. Standard units, use inches).
e0=required minimum wall thickness for the reference steel (in mm 
or, for U.S. Standard units, use inches).
Rm1=guaranteed minimum tensile strength of the metal to be used 
(in N/mm2 or for U.S. Standard units, use pounds per square inch).
A1=guaranteed minimum elongation (as a percentage) of the metal to 
be used on fracture under tensile stress (see paragraph (c)(1) of this 
section).
* * * * *
    (7) * * *
    (iv) * * *
    (C) another material or thickness when approved under the 
conditions established by the Associate Administrator for Hazardous 
Materials Safety for reuse without retesting.
    (c) * * *
    (2) * * * For a UN 1H1 plastic drum, replacing a removable gasket 
or closure device with a replacement of the same design and material 
which provides equivalent performance does not constitute 
reconditioning. * * *
* * * * *

Sec. 173.28  [Amended]

    16. In addition, in Sec. 173.28, in the first sentence of paragraph 
(c)(2), the wording ``or a UN 1H1 plastic drum'' is added immediately 
following the wording ``other than a metal drum''.
    17. In Sec. 173.32, in paragraph (d) a new third sentence is added 
at the end of the paragraph, in paragraph (e)(2)(i), the second 
sentence is revised, and a new paragraph (t) is added, to read as 
follows:

Sec. 173.32  Qualification, maintenance and use of portable tanks other 
than Specification IM portable tanks.

* * * * *
    (d) * * * A stainless steel portable tank internally lined with 
polyethylene, which was constructed on or before October 1, 1996, and 
complies with all requirements of Specification 57 except that it is 
equipped with a polypropylene discharge ball valve and polypropylene 
secondary discharge opening closure, may be marked as a Specification 
57 portable tank and used in accordance with the provisions of this 
section.
    (e) * * *
    (2) * * *
    (i) * * * Each Specification 57 tank must be leak tested by a 
minimum sustained air pressure of at least three pounds per square inch 
gage applied to the entire tank. * * *
* * * * *
    (t) Exemption portable tanks based on DOT 51 portable tanks. (1) 
The owner of a portable tank constructed in accordance with and used 
under an exemption issued prior to August 31, 1996, that was in 
conformance with the requirements for Specification DOT 51 portable 
tanks with the exception of the location of fill and discharge outlets, 
shall examine the portable tank and its design to determine if it meets 
the new outlet requirements contained in Sec. 178.245-1(d) of this 
subchapter. If the owner determines that the portable tank is in 
compliance with all the requirements of Sec. 178.245 of this 
subchapter, the exemption number stenciled on the portable tank shall 
be removed and the specification plate (or a plate placed adjacent to 
the specification plate) shall be durably marked ``DOT 51--E*****'' 
(where ***** is to be replaced by the exemption number).
    (2) During the period the portable tank is in service, and for one 
year thereafter, the owner of the portable tank must retain on file at 
its principal place of business a copy of the last exemption in effect.

Sec. 173.115  [Amended]

    18. In Sec. 173.115, in paragraph (b)(1), the wording ``(41 psia)'' 
is revised to read ``(40.6 psia)''.
    19. In Sec. 173.120, a new paragraph (b)(3) is added to read as 
follows:

Sec. 173.120  Class 3--Definitions.

* * * * *
    (b) * * *
    (3) A combustible liquid which does not sustain combustion is not 
subject to the requirements of this subchapter as a combustible liquid. 
A procedure for determining if a material sustains combustion when 
heated under test conditions and exposed to an external source of flame 
is provided in Appendix H of this part.
* * * * *

Sec. 173.121  [Amended]

    20. In Sec. 173.121, in the second sentence of paragraph (a), the 
wording ``or indicates that the packing group is to be determined on 
the basis of the grouping criteria for Class 3,'' is removed.
    21. In Sec. 173.125, paragraph (a) is revised to read as follows:

Sec. 173.125  Class 4--Assignment of packing group.

    (a) The packing group of a Class 4 material is assigned in Column 
(5) of the Sec. 172.101 Table. When the Sec. 172.101 Table provides 
more than one packing group for a hazardous material, the packing group 
shall be determined on the basis of test results following test methods 
given in appendix E of this part and by applying the appropriate 
criteria given in this section.
* * * * *
    22. In Sec. 173.127, the section heading is revised, paragraph 
(b)(1) is removed, paragraphs (b)(2) and (b)(3) are redesignated as 
paragraphs (b)(1) and (b)(2), and the paragraph (b) heading and the 
newly designated paragraph (b)(1) introductory text are revised to read 
as follows:

Sec. 173.127  Class 5, Division 5.1--Definition and assignment of 
packing grou
FR Doc. 96-24398 Performance-Oriented Packaging Standards; Final Transitional Provisions
ps.

* * * * *
    (b) Assignment of packing group. (1) The packing group of a 
Division 5.1 material shall be as assigned in Column (5) of the 
Sec. 172.101 Table. When the Sec. 172.101 Table provides more than one 
packing group for a hazardous material,

[[Page 50626]]

the packing group shall be determined on the basis of test results 
following test methods given in appendix F of this part and by applying 
the following criteria:
* * * * *

Sec. 173.133  [Amended]

    23. In Sec. 173.133, in paragraph (a) introductory text, in the 
second sentence, the wording ``more than one packing group and hazard 
zone'' is revised to read ``more than one packing group or hazard 
zone''.
    24. In Sec. 173.134, the introductory text of paragraph (b)(3)(ii) 
is revised and a new paragraph (b)(4) is added to read as follows:

Sec. 173.134  Class 6, Division 6.2--Definitions, exceptions and 
packing group assignments.

* * * * *
    (b) * * *
    (3) * * *
    (ii) For other than a waste culture or stock of an infectious 
substance, the specific packaging requirements of Sec. 173.197, if 
packaged in a rigid non-bulk packaging conforming to--
* * * * *
    (4) A waste culture or stock of infectious substances may be 
offered for transportation and transported as a regulated medical waste 
when the culture or stock--
    (i) Conforms to Biosafety Level 1, 2 or 3, as defined in HHS 
Publication No. (CDC) 93-8395, Biosafety in Microbiological and 
Biomedical Laboratories. 3rd Edition, May 1993, Section II;
    (ii) Is packaged in accordance with requirements specified in 
Sec. 173.197; and
    (iii) Is transported by a private or contract carrier using a 
vehicle dedicated to the transportation of medical waste.
* * * * *
    25. In Sec. 173.151, the section heading is revised and a new 
paragraph (d) is added to read as follows:

Sec. 173.151  Exceptions for Class 4.

* * * * *
    (d) Limited quantities of Division 4.3 (dangerous when wet) 
material. Limited quantities of Division 4.3 (dangerous when wet) 
solids in Packing Groups II and III are excepted from labeling, unless 
offered for transportation or transported by aircraft, and the 
specification packaging requirements of this subchapter when packaged 
in combination packagings according to this paragraph. In addition, 
shipments of limited quantities are not subject to subpart F 
(Placarding) of part 172 of this subchapter. Each package must conform 
to the packaging requirements of subpart B of this part and may not 
exceed 30 kg (66 pounds) gross weight. The following combination 
packagings are authorized:
    (1) For Division 4.3 solids in Packing Group II, inner packagings 
not over 0.5 kg (1.1 pound) net capacity each, packed in strong outer 
packagings; and
    (2) For Division 4.3 solids in Packing Group III, inner packagings 
not over 1 kg (2.2 pounds) net capacity each, packed in strong outer 
packagings.
    26. In Sec. 173.156, paragraph (b) is revised to read as follows.

Sec. 173.156  Exceptions for ORM materials.

* * * * *
    (b) ORM-D. Packagings for ORM-D materials are specified according 
to hazard class in Secs. 173.150 through 173.155 and in Sec. 173.306. 
In addition to other exceptions specified for ORM-D materials in this 
part:
    (1) Strong outer packagings as specified in this part, the marking 
requirements specified in Sec. 172.316 of this subchapter, and the 30 
kg (66 pounds) gross weight limitation are not required for materials 
classed as ORM-D when--
    (i) Unitized in cages, carts, boxes or similar overpacks;
    (ii) Offered for transportation or transported by:
    (A) Rail;
    (B) Private or contract motor carrier; or
    (C) Common carrier in a vehicle under exclusive use for such 
service; and
    (iii) Transported to or from a manufacturer, a distribution center, 
or a retail outlet, or transported to a disposal facility from one 
offeror.
    (2) The 30 kg (66 pounds) gross weight limitation does not apply to 
materials classed as ORM-D when offered for transportation, or 
transported, by highway or rail between a manufacturer, a distribution 
center, and a retail outlet provided--
    (i) Inner packagings conform to the quantity limits for inner 
packagings specified in Secs. 173.150(b), 173.152(b), 173.154(b), 
173.155(b) and 173.306 (a) and (b), as appropriate;
    (ii) The inner packagings are packed into corrugated fiberboard 
trays to prevent them from moving freely;
    (iii) The trays are placed in a fiberboard box which is banded and 
secured to a wooden pallet by metal, fabric, or plastic straps, to form 
a single palletized unit;
    (iv) The package conforms to the general packaging requirements of 
subpart B of this part;
    (v) The maximum net quantity of hazardous material permitted on one 
palletized unit is 250 kg (550 pounds); and
    (vi) The package is properly marked in accordance with Sec. 172.316 
of this subchapter.
    27. In Sec. 173.158, paragraph (d) is revised, and paragraph (f)(1) 
is amended by adding a second sentence at the end of the paragraph to 
read as follows:

Sec. 173.158  Nitric acid.

* * * * *
    (d) Nitric acid of 90 percent or greater concentration, when 
offered for transportation or transported by rail, highway, or water 
may be packaged as follows:
    (1) In 4C1, 4C2, 4D or 4F wooden boxes with inner packagings 
consisting of glass bottles further individually overpacked in tightly 
closed metal packagings. Glass bottles must be of 2.5 L (0.66 gallon) 
or less capacity and cushioned with a non-reactive, absorbent material 
within the metal packagings.
    (2) In combination packagings with 1A2, 1B2, 1D, 1G, 1H2, 3H2 or 4G 
outer packagings with inner glass packagings of 2.5 L (0.66 gallons) or 
less capacity cushioned with a non-reactive, absorbent material and 
packed within a tightly closed intermediate packaging of metal or 
plastic.
    (f) * * *
    (1) * * * 6HH1 and 6HA1 composite packaging with plastic inner 
receptacles meeting the compatibility requirements Sec. 173.24(e) 
(e.g., PFA Teflon) are authorized.
* * * * *
    28. Section 173.170 is added to read as follows:

Sec. 173.170  Black powder for small arms.

    Black powder for small arms that has been classed in Division 1.1 
may be reclassed as a Division 4.1 material, for domestic 
transportation by motor vehicle, rail freight, and cargo vessel only, 
subject to the following conditions:
    (a) The powder must be examined and approved for Division 1.1 and 
Division 4.1 classification in accordance with Secs. 173.56 and 173.58;
    (b) The total quantity of black powder in one motor vehicle, rail 
car, or freight container may not exceed 45.4 kg (100 pounds) net mass, 
and no more than four freight containers may be on board one cargo 
vessel;
    (c) The black powder must be packed in inner metal or heavy wall 
conductive plastic receptacles not over 450 g (15.9 ounces) net 
capacity each, with no more than 25 cans in one outer UN 4G fiberboard 
box. The inner packagings must be arranged and protected so as to

[[Page 50627]]

prevent simultaneous ignition of the contents. The complete package 
must be of the same type which has been examined as required in 
Sec. 173.56;
    (d) Each completed package must be marked ``BLACK POWDER FOR SMALL 
ARMS'' and ``NA 0027''; and
    (e) Each package must bear the FLAMMABLE SOLID label.

Sec. 173.183  [Amended]

    29. In Sec. 173.183, in paragraphs (a) and (b), the wording ``, 
polypropylene canister,'' is added immediately following the wording 
``closed metal can'' each place it appears.
    30. In Sec. 173.225, in paragraph (a), a new sentence is added as 
the penultimate sentence to read as follows:

Sec. 173.225  Packaging requirements and other provisions for organic 
peroxides.

    (a) * * * No used material, other than production residues or 
regrind from the same production process, may be used in plastic 
packagings. * * *
* * * * *
    31. In Sec. 173.306, paragraph (i)(1) is removed, paragraphs (i)(2) 
through (i)(4) are redesignated as paragraphs (i)(1) through (i)(3), 
respectively, and the introductory text in paragraph (i) is revised to 
read as follows:

Sec. 173.306  Limited quantities of compressed gases.

* * * * *
    (i) An aerosol is flammable if a positive test result is obtained 
using any of the following test methods:
* * * * *
    32. In Sec. 173.314, as amended at 61 FR 28676, effective October 
1, 1996, in the paragraph (c) table, Note 2 is revised and Notes 9 and 
10 are added, to read as follows:

Sec. 173.314  Compressed gases in tank cars and multi-unit tank cars.

* * * * *
    (c) * * *
    Notes:
* * * * *
    2. The liquefied gas must be loaded so that the outage is at 
least two percent of the total capacity of the tank at the reference 
temperature of 46 deg. C (115 deg. F) for a noninsulated tank; 
43 deg. C (110 deg. F) for a tank having a thermal protection system 
incorporating a metal jacket that provides an overall thermal 
conductance at 15.5 deg. C (60 deg. F) of no more than 10.22 
kilojoules per hour per square meter per degree Celsius (0.5 Btu per 
hour/per square foot/per degree F) temperature differential; and 
41 deg. C (105 deg. F) for an insulated tank having an insulation 
system incorporating a metal jacket that provides an overall thermal 
conductance at 15.5 deg. C (60 deg. F) of no more than 1.5333 
kilojoules per hour per square meter per degree Celsius (0.075 Btu 
per hour/per square foot/per degree F) temperature differential.
* * * * *
    9. For a liquefied petroleum gas, the liquefied gas must be 
loaded so that the outage is at least one percent of the total 
capacity of the tank at the reference temperature of 46 deg. C 
(115 deg. F) for a noninsulated tank; 43 deg. C (110 deg. F) for a 
tank having a thermal protection system incorporating a metal jacket 
that provides an overall thermal conductance at 15.5 deg. C (60 deg. 
F) of no more than 10.22 kilojoules per hour per square meter per 
degree Celsius (0.5 Btu per hour/per square foot/per degree F) 
temperature differential; and 41 deg. C (105 deg. F) for an 
insulated tank having an insulation system incorporating a metal 
jacket that provides an overall thermal conductance at 15.5 deg. C 
(60 deg. F) of no more than 1.5333 kilojoules per hour per square 
meter per degree Celsius (0.075 Btu per hour/per square foot/per 
degree F) temperature differential.
    10. For liquefied petroleum gas and anhydrous ammonia, during 
the months of November through March (winter), the following 
reference temperatures may be used: 38 deg. C (100 deg. F) for a 
noninsulated tank; 32 deg. C (90 deg. F) for a tank having a thermal 
protection system incorporating a metal jacket that provides an 
overall thermal conductance at 15.5 deg. C (60 deg. F) of no more 
than 10.22 kilojoules per hour per square meter per degree Celsius 
(0.5 Btu per hour/per square foot/per degree F) temperature 
differential; and 29 deg. C (85 deg. F) for an insulated tank having 
an insulation system incorporating a metal jacket and insulation 
that provides an overall thermal conductance at 15.5 deg. C (60 deg. 
F) of no more than 1.5333 kilojoules per hour per square meter per 
degree Celsius (0.075 Btu per hour/per square foot/per degree F) 
temperature differential. The winter reference temperatures may only 
be used for a tank car shipped directly to a consumer for unloading 
and not stored in transit. The offeror of the tank must inform each 
customer that the tank car was filled based on winter reference 
temperatures. The tank must be unloaded as soon as possible after 
March in order to retain the specified outage and to prevent a 
release of hazardous material which might occur due to the tank car 
becoming liquid full at higher temperatures.
* * * * *

Sec. 173.314  [Amended]

    33. In addition, in Sec. 173.314, in the paragraph (c) table, as 
amended at 61 FR 28676, effective October 1, 1996, the following 
changes are made:
    a. For the entry ``Ammonia, anhydrous, or ammonia solutions >50 
percent ammonia'', in Column 2, the wording ``Note 2'' is removed and 
``Notes 2, 10'' added in its place.
    b. For the entry ``Division 2.1 materials not specifically provided 
in this table'' in Column 2, the wording ``Note 3'' is removed and the 
wording ``Notes 9, 10'' added in its place.

Appendix H to Part 173--[Amended]

    34. In Appendix H to Part 173, the second sentence of paragraph 
5.(b) is revised and in paragraph 5.(h), a second sentence is added at 
the end of the paragraph to read as follows:

Appendix H to Part 173--Method of Testing for Sustained 
Combustibility

* * * * *
    5. * * *
    (b) * * * For the appropriate test temperature, see paragraph 
5.(h) of this appendix. * * *
* * * * *
    (h) * * * In the case of a material which has a flash point 
above 60.5 deg. C (141 deg. F) and below 93 deg. C (200 deg. F), if 
sustained combustion interpreted in accordance with paragraph 6. of 
this appendix is not found at a test temperature of 5 deg. C (9 deg. 
F) above its flash point, repeat the complete procedure with new 
test portions, but at a test temperature of 20 deg. C (36 deg. F) 
above its flash point.
* * * * *

PART 178--SPECIFICATIONS FOR PACKAGINGS

    35. The authority citation for part 178 continues to read as 
follows:

    Authority: 49 U.S.C. 5101-5127; 49 CFR 1.53.

    36. Section 178.245-1 is revised to read as follows:

Sec. 178.245-1  Requirements for design and construction.

    (a) Tanks must be seamless or welded steel construction or 
combination of both and have a water capacity in excess of 454 kg 
(1,000 pounds). Tanks must be designed, constructed, certified and 
stamped in accordance with the ASME Code.
    (b) Tanks must be postweld heat treated and radiographed as 
prescribed in the ASME Code except that each tank constructed in 
accordance with part UHT of the ASME Code must be postweld heat 
treated. Where postweld heat treatment is required, the tank must be 
treated as a unit after completion of all the welds in and/or to the 
shell and heads. The method must be as prescribed in the ASME Code. 
Welded attachments to pads may be made after postweld heat treatment is 
made. A tank used for anhydrous ammonia must be postweld heat treated. 
The postweld heat treatment must be as prescribed in the ASME Code, but 
in no event at less than 1050 deg. F tank metal temperature. 
Additionally, tanks constructed in accordance with part UHT of the ASME 
Code must conform to the following requirements:
    (1) Welding procedure and welder performance tests must be made

[[Page 50628]]

annually in accordance with section IX of the ASME Code. In addition to 
the essential variables named therein, the following must be considered 
to be essential variables: number of passes, thickness of plate, heat 
input per pass, and manufacturer's identification of rod and flux. The 
number of passes, thickness of plate and heat input per pass may not 
vary more than 25 percent from the procedure qualification. Records of 
the qualification must be retained for at least 5 years by the tank 
manufacturer and made available to duly identified representatives of 
the Department of Transportation or the owner of the tank.
    (2) Impact tests must be made on a lot basis. A lot is defined as 
100 tons or less of the same heat and having a thickness variation no 
greater than plus or minus 25 percent. The minimum impact required for 
full-sized specimens shall be 20 foot-pounds (or 10 foot-pounds for 
half-sized specimens) at 0 deg. F Charpy V-Notch in both the 
longitudinal and transverse direction. If the lot test does not pass 
this requirement, individual plates may be accepted if they 
individually meet this impact requirement.
    (c) Except as provided in paragraph (d) of this section, all 
openings in the tank shall be grouped in one location, either at the 
top of the tank or at one end of the tank.
    (d) The following openings may be installed at locations other than 
on the top or end of the tank:
    (1) The openings for liquid level gauging devices, pressure gauges, 
or for safety devices, may be installed separately at the other 
location or in the side of the shell;
    (2) One plugged opening of 2-inch National Pipe Thread or less 
provided for maintenance purposes may be located elsewhere;
    (3) An opening of 3-inch National Pipe Size or less may be provided 
at another location, when necessary, to facilitate installation of 
condensing coils; or
    (4) Filling and discharge connections may be installed below the 
normal liquid level of the tank if the tank design conforms to the 
following requirements:
    (i) The tank must be permanently mounted in a full framework for 
containerized transport. For each tank design, a prototype tank, must 
fulfill the requirements of parts 450 through 453 of this title for 
compliance with the requirements of Annex II of the International 
Convention for Safe Containers.
    (ii) Each filling and discharge connection must be equipped with an 
internal self-closing stop-valve capable of closing within 30 seconds 
of actuation. Each internal self-closing stop-valve must be protected 
by a shear section or sacrificial device located outboard of the valve. 
The shear section or sacrificial device must break at no more than 70 
percent of the load that would cause failure of the internal self-
closing stop- valve.
    (iii) Each internal self-closing stop-valve must be provided with 
remote means of automatic closure, both thermal and mechanical. The 
thermal means of automatic closure must actuate at a temperature of not 
over 250 deg. F.
    (e) Each uninsulated tank used for the transportation of compressed 
gas, as defined in Sec. 173.300 of this subchapter, must have an 
exterior surface finish that is significantly reflective, such as a 
light reflecting color if painted, or a bright reflective metal or 
other material if unpainted.
    37. In Sec. 178.245-4, a new paragraph (e) is added to read as 
follows:

Sec. 178.245-4  Tank mountings.

* * * * *
    (e) A DOT 51 portable tank that meets the definition of 
``container'' in Sec. 450.3(a)(3) of this title must meet the 
requirements of parts 450 through 453 of this title, in addition to the 
requirements of this subchapter.

Sec. 178.245-6  [Amended]

    38. In Sec. 178.245-6, in the first sentence of paragraph (a), the 
wording ``on one of the heads of the tank'' is revised to read ``in 
close proximity to the ASME ``U'' stamp certification''.
    39. In Sec. 178.270-12, in paragraph (a), the first two sentences 
are revised to read as follows:

Sec. 178.270-12  Valves, nozzles, piping, and gauging devices.

    (a) All tank nozzles, except those provided for filling and 
discharge connections below the normal liquid level of the tank, relief 
devices, thermometer wells, and inspection openings, must be fitted 
with manually operated stop valves located as near the shell as 
practicable either internal or external to the shell. Each filling and 
discharge connection located below the normal liquid level of the tank 
must be equipped with an internal discharge valve. * * *
* * * * *
    40. In Sec. 178.601, the word ``or'' is removed at the end of 
paragraph (c)(4)(iv), the period at the end of paragraph (c)(4)(v) is 
removed and ``; or'' added in its place and new paragraphs (c)(4)(vi) 
and (g)(8) are added to read as follows:

Sec. 178.601  General requirements.

* * * * *
    (c) * * *
    (4) * * *
    (vi) For a steel drum, variations in design elements which do not 
constitute a different design type under the provisions of paragraph 
(g)(8) of this section.
* * * * *
    (g) * * *
    (8) For a steel drum with a capacity greater than 50 L (13 gallons) 
manufactured from low carbon, cold-rolled sheet steel meeting ASTM 
designations A366/A366M or A568/A568M, variations in elements other 
than the following design elements are considered minor and do not 
constitute a different drum design type, or ``different packaging'' as 
defined in paragraph (c) of this section for which design qualification 
testing and periodic retesting are required. Minor variations 
authorized without further testing include changes in the identity of 
the supplier of component material made to the same specifications, or 
the original manufacturer of a DOT specification or UN standard drum to 
be remanufactured. A change in any one or more of the following design 
elements constitutes a different drum design type:
    (i) The packaging type and category of the original drum and the 
remanufactured drum, i.e., 1A1 or 1A2;
    (ii) The style, (i.e., straight-sided or tapered);
    (iii) Except as provided in paragraph (g)(3) of this section, the 
rated (marked) capacity and outside dimensions;
    (iv) The physical state for which the packaging was originally 
approved (e.g., tested for solids or liquids);
    (v) An increase in the marked level of performance of the original 
drum (i.e., to a higher packing group, hydrostatic test pressure, or 
specific gravity to which the packaging has been tested);
    (vi) Type of side seam welding;
    (vii) Type of steel;
    (viii) An increase greater than 10% or any decrease in the steel 
thickness of the head, body, or bottom;
    (ix) End seam type, (e.g., triple or double seam);
    (x) A reduction in the number of rolling hoops which equal or 
exceed the diameter over the chimes;
    (xi) The location, type or size, and material of closures (other 
than the cover of UN 1A2 drums); and
    (xii) For UN 1A2 drums:
    (A) Gasket material (e.g., plastic), or properties affecting the 
performance of the gasket;
    (B) Configuration or dimensions of the gasket;

[[Page 50629]]

    (C) Closure ring style including bolt size, (e.g., square or round 
back, 0.625'' bolt); and
    (D) Closure ring thickness.
* * * * *
    41. In Sec. 178.705, in paragraph (c)(2)(ii), a new sentence is 
added after the first sentence to read as follows.

Sec. 178.705  Standards for metal intermediate bulk containers.

* * * * *
    (c) * * *
    (2) * * *
    (ii) * * * This does not apply to fusible devices unless such 
devices are the only source of pressure relief for the IBC. * * *

Sec. 178.705  [Amended]

    42. In addition, in Sec. 178.705, in paragraph (c)(1)(iv)(B), in 
the second formula, the Formula for U.S. Standard units, the number 
``544'' is revised to read ``21.4''.

    Issued in Washington, DC on September 18, 1996 under authority 
delegated in 49 CFR part 1.
Kelley S. Coyner,
Deputy Administrator.
[FR Doc. 96-24398 Filed 9-25-96; 8:45 am]
BILLING CODE 4910-60-P

Complete official Federal Register PDF

FR Doc. 96-24316 Rules of Practice Amendments
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50640-50651]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24316]

      

[[Page 50639]]

_______________________________________________________________________

Part VI

Federal Trade Commission

_______________________________________________________________________

16 CFR Part 2, et al.

Rules of Practice Amendments; Final Rule

Federal Register / Vol. 61, No. 188 / Thursday, September 26, 1996 / 
Rules and Regulations

[[Page 50640]]

FEDERAL TRADE COMMISSION

16 CFR Parts 2, 3, and 4

Rules of Practice Amendments

AGENCY: Federal Trade Commission (FTC).

ACTION: Interim rules with request for comments.

-----------------------------------------------------------------------

SUMMARY: The FTC is amending its Rules of Practice for adjudicatory 
proceedings. The amendments are expected to reduce the cost, 
complexity, and length of FTC adjudicatory proceedings by clarifying 
and streamlining the agency procedures governing such proceedings.

DATES: These rule amendments are effective on September 26, 1996. 
Comments must be received on or before November 25, 1996. Dates of 
Applicability: These amendments will govern all Commission adjudicatory 
proceedings that are commenced on or after January 1, 1997. They will 
also govern all Commission adjudicatory proceedings that are currently 
pending and all proceedings that are commenced before January 1, 1997, 
except to the extent that, in the opinion of the Administrative Law 
Judge (ALJ) or the Commission, the application of one or more amended 
rules in a particular proceeding would not be feasible or would work 
injustice.

ADDRESSES: Written comments must be submitted in 20 copies to the 
Office of the Secretary, Room 159, Federal Trade Commission, 6th Street 
& Pennsylvania Avenue, N.W., Washington, D.C. 20580. Individuals filing 
comments need not submit multiple copies.

FOR FURTHER INFORMATION CONTACT: Cynthia Hogue Levy, (202) 326-2158, 
Jonathan Luna, (202) 326-2444, or Alex Tang, (202) 326-2447, Attorneys, 
Office of General Counsel, FTC, Sixth Street & Pennsylvania Avenue, 
N.W., Washington, D.C. 20580.

SUPPLEMENTARY INFORMATION: On May 30, 1995, FTC Chairman Robert 
Pitofsky announced the formation of a special Task Force on 
Administrative Adjudication (``Task Force'') to review FTC rules and 
policies governing the conduct of administrative litigation at the 
Commission (``Part 3 Rules''). The Task Force developed recommendations 
for clarifying and streamlining current procedures for adjudication 
before the Commission.
    As the Commission has previously recognized, unnecessary delay in 
adjudications can have a negative impact on the Commission's 
adjudicatory program and law enforcement mission. The agency's 
longstanding policy has been that, to the extent practicable and 
consistent with requirements of law, adjudicative proceedings shall be 
conducted expeditiously and that both the Administrative Law Judge and 
litigants shall make every effort to avoid delay at each stage of a 
proceeding. 16 CFR 3.1. Unnecessarily long proceedings waste Commission 
and private resources. Delay can extend legal uncertainty for 
respondents and third parties, and may reduce the efficacy of any 
remedies resulting from such proceedings. Delay may also lessen the 
quality of agency decisions when evidence becomes stale. The risk of 
lengthy proceedings may also undermine administrative adjudication as a 
valid alternative when parties are deciding whether to settle a matter. 
While some respondents may benefit, others may feel unduly pressured to 
settle if they believe that Part 3 litigation will entail a substantial 
commitment of time and resources. Similarly, the expectation of 
unnecessarily lengthy administrative litigation may lead Commission 
staff to recommend Commission acceptance of an unduly limited 
settlement. The length of time taken in FTC proceedings may also be a 
factor that some courts consider in deciding whether to grant a 
preliminary injunction pending the outcome of the Commission's 
administrative proceeding. FTC v. Freeman Hosp., 1995-1, Trade Cas. 
(CCH) para. 71,037 at 74,893 n.8 (D. Mo. 1995), aff'd, 69 F. 3d 260 
(8th Cir. 1995).
    In light of such concerns, the Commission has made several efforts 
over the years to identify ways to make Part 3 proceedings more 
efficient without sacrificing the quality of decisionmaking or 
compromising the procedural rights of parties in such proceedings. In 
1985, for example, the Commission adopted various rule changes 
specifically designed to improve prehearing case management and 
expedite Part 3 proceedings, including the existing requirement 
regarding the timely initiation of evidentiary hearings. 50 FR 41485 
(Oct. 11, 1985).
    More recently, the Commission has made further strides to reduce 
the time taken to render decisions in adjudicative proceedings.\1\ In 
April 1994, the Commission set internal deadlines for the preparation 
and issuance of final orders and opinions in appeals from an initial 
decision. This schedule established deadlines for each of the principal 
stages of preparation of adjudicative opinions, including separate 
statements. Under the new schedule it is expected that the drafting 
process is the usual adjudicative proceeding should generally span 
approximately eight (8) months (following oral argument before the 
Commission). To ensure that its adjudicative decisionmaking remains on 
schedule, the Commission meets quarterly, or more often when necessary, 
to review the progress of each pending adjudicative matter on appeal 
before the Commission.
---------------------------------------------------------------------------

    \1\ In announcing institutional improvements at the agency, 
then-Chairman Steiger explained that the Commission had determined 
to take action to address criticisms of delay that were contained in 
a Task Force Report of the American Bar Association. See Prepared 
Remarks of Chairman Janet D. Steiger Before Section of Antitrust 
Law, American Bar Association (Apr. 8, 1994) (referring to Report of 
the American Bar Association Section of Antitrust Law Special 
Committee to Study the Role of the Federal Trade Commission, 58 
ANTITRUST L.J. 43 (1989)).
---------------------------------------------------------------------------

    Since implementing a deadline schedule governing its own conduct in 
the preparation of final orders and opinions in adjudicative 
proceedings, the Commission has disposed of a backlog of cases pending 
when the schedule was adopted. Currently, there is one adjudicative 
proceeding pending before the Commission on appeal.
    Building upon these past actions, the Commission has determined to 
adopt further procedural rule changes as set forth below. The 
Commission believes that these changes will advance its goal of 
assuring the public that administrative law enforcement proceedings 
will be resolved fairly and within a reasonable time.
    The Commission also encourages the ALJs to consider implementing 
other techniques, besides the rule amendments announced in this notice, 
to expedite action in each adjudicatory proceeding. Efficient 
adjudication required affirmative case management, and ALJs have broad 
powers under Rule 3.42(c) that should be used fully to balance the 
interests in expedition and fairness.
    Two techniques for expediting evidentiary hearings particularly 
merit attention by the ALJs. First, the Commission encourages the ALJs 
generally to conduct the evidentiary hearing by using consecutive, full 
trial days. Historical data for the past ten years indicate that while 
the average evidentiary trial spans over three (3) months, only thirty 
of those days are actual trial days. Normally conducting proceedings on 
consecutive days, in most cases, would enable the ALJ and the litigants 
to use the period designated for trial to its fullest advantage.

[[Page 50641]]

    Second, in appropriate cases the ALJs should encourage the parties 
to submit the direct examination of expert witnesses in writing, in 
lieu of live direct examination, reserving live testimony for the 
cross-examination. This practice would reduce the time necessary for 
the presentation of direct testimony but still allow the ALJ to assess 
the demeanor and credibility of expert witnesses. Submission of direct 
expert testimony in writing may result in more focused cross-
examination and would afford both the parties and the ALJ an 
opportunity to identify in advance any questions raised by the expert's 
direct testimony.
    The Commission also invites the ALJs to exercise their discretion 
in regulating the course of adjudicative proceedings in a manner that 
expedites proceedings, consistent with due process considerations. For 
instance, ALJs may wish to consider requiring that, in appropriate 
circumstances, proposed findings of fact and conclusions of law be 
submitted by the parties before, rather than after, trial. In certain 
proceedings, this practice could instill more rigor in the litigants' 
presentation of evidence at trial, while also aiding the ALJ in 
monitoring the introduction of evidence and in preparing findings of 
fact and conclusions of law after the evidentiary hearing. ALJs may 
wish to utilize an alternative procedure, either in conjunction with, 
or in lieu of, pretrial findings of fact and conclusions of law. For 
example, an ALJ may require the parties to submit proposed stipulations 
and contentions to further narrow the legal and factual issues to be 
presented during the evidentiary hearing. See e.g., United States v. 
American Telephone & Telegraph Co., 552 F. Supp. 131, 140 (D.D.C. 
1982).
    As a further step in expediting administrative adjudication, the 
Commission has determined to establish an alternative ``fast track'' 
schedule that respondents may elect in appropriate administrative 
proceedings.\2\ The option is available when a federal district court 
has granted a preliminary injunction in a collateral federal court 
proceeding, brought by the Commission to challenge some or all of the 
same conduct at issue in the administrative proceeding.\3\ Under the 
fast track schedule, the Commission would issue a final order and 
opinion within thirteen (13) months after the latest of the following 
events (``triggering event''): (1) Issuance of an administrative 
complaint; (2) entry of a preliminary injunction by a federal district 
court; or (3) the date on which respondent elects the fast track. This 
deadline may be amended by the Commission only in the following two 
circumstances: (1) If the Commission's final order or opinion contains 
material or information designated for in camera treatment, thus 
obliging the agency to provide advance notification of the Commission's 
intent to disclose that information to submitters of such in camera 
material or information; or (2) if the Commission determines that 
adherence to the thirteen-month deadline would result in a miscarriage 
of justice due to circumstances unforeseen at the time of respondent's 
election of the fast track proceeding.
---------------------------------------------------------------------------

    \2\ The new procedure could apply to any administrative 
adjudication specifically designated by the Commission in which the 
agency also seeks a preliminary injunction to enjoin the same 
conduct challenged in the administrative complaint. The Commission 
expects that most such cases will involve challenges to mergers and 
acquisitions.
    \3\ If the preliminary injunction is later vacated, the 
Commission, in its discretion, may take such action as it deems 
appropriate in the administrative adjudication.
---------------------------------------------------------------------------

    When the Commission determines to authorize its staff to seek a 
preliminary injunction in federal court, the agency may also determine 
to advise the respondent that the respondent may elect the fast track 
schedule if the federal district court preliminarily enjoins the 
challenged conduct. Such notice will be provided to the prospective 
respondent at the time it is notified of the Commission's action 
authorizing the preliminary injunction motion. The Commission expects 
that the fast track procedure will be available to respondents in the 
typical merger challenge; however, certain cases may appear too complex 
at the outset to be designated as appropriate for the fast track 
schedule. In such instances, the Commission would not notify the 
respondent respecting an option to elect the fast track.
    The new rule specifies the period of time within which a potential 
respondent must elect the fast track schedule. In administrative 
proceedings involving multiple respondents, the fast track schedule 
will be available only if all respondents elect it.
    The Commission expects that the expedited deadlines imposed under 
the fast track procedures will require active management by the ALJ. 
Although the new fast track rule specifies certain interim deadlines, 
the time frames for other interim stages are left to the ALJ's 
discretion. Thus, the length of time to be allotted for discovery, the 
evidentiary hearing, and post-trial written submissions are to be set 
by the ALJ, in keeping with the fast track requirement that the ALJ 
must file the initial decision within one hundred ninety-five (195) 
days after the triggering event specified in new Sec. 3.11A. The 
Commission anticipates that in a typical proceeding governed by the 
fast track schedule, discovery will be completed within three (3) 
months, the evidentiary hearing will span no longer than six weeks, and 
post-trial submissions will be submitted within four weeks following 
the conclusion of the evidentiary hearing.
    The ALJ may in his discretion treat discovery from the preliminary 
injunction hearing and transcripts of testimony in the preliminary 
injunction proceeding as if the material had been discovered and 
presented in the administrative proceeding. The ALJ may limit the 
number of depositions, witnesses, or document production under his 
plenary authority. See 16 CFR 3.42(c)(6).
    The fast track appellate procedure before the Commission differs 
from that governing the standard administrative adjudication. In 
addition to the shorter time frame required for issuance of the 
Commission's final order and opinion, the fast track procedure requires 
the simultaneous filing of the parties' initial appeal briefs (rather 
than the staggered cross-appeal procedure permitted under Rule 
3.52(c)). The Commission's final order and opinion in the proceeding 
will be ready for issuance within one hundred ninety-five (195) days 
after the filing of the ALJ's initial decision.\4\
---------------------------------------------------------------------------

    \4\ The Commission's final order and opinion will be ready for 
issuance within the specified time period, except that, if the 
Commission's order or opinion contains material or information that 
has been designated for in camera treatment, its issuance may be 
delayed to the extent necessary to provide the submitters of such 
material or information with advance notice of the Commission's 
intent to release such information in the final order or opinion in 
the proceeding.
---------------------------------------------------------------------------

    The thirteen (13) month deadline contemplated under the new 
procedural rule compares favorably with the schedules followed by 
federal district courts in a number of permanent injunction hearings 
involving mergers. Since 1986, the Department of Justice Antitrust 
Division has litigated eight merger enforcement actions on the merits 
in permanent injunction proceedings in federal court.\5\ On average, 
these cases spanned approximately ten (10) months from filing of the 
complaint to issuance of the district court opinion.See generally 
United States v. Mercy Health Services, 902 F. Supp. 968 (N.D. Iowa 
1995)--complaint to opinion: 141 days (including ten-day trial); United 
States v. Nat. L.C., and D.R. Partners D/B/A Donrey Media Group, 892 F. 
Supp 1146 (W.D. Ark. 1995)--complaint to

[[Page 50642]]

opinion: ninety-four days (including eight-day trial); United States v. 
United Tote, Inc., 768 F. Supp. 1064 (D. Del. 1991)--complaint to 
opinion: 422 days [1.2 years] (including six-day trial); United States 
v. Baker Hughes, Inc., 731 F. Supp. 3 (D.D.C. 1990)--complaint to 
opinion: seventy days (including one-day trial); United States v. The 
Rank Organisation plc, 1990-2 Trade Cas. (CCH) para.69,257 (C.D. Cal. 
1990)--complaint to opinion: 141 days (including eight-day trial); 
United States v. Rockford Memorial Corp., 717 F. Supp. 1251 (N.D. Ill. 
1989)--complaint to opinion: 267 days (including nineteen-day trial); 
United States v. Syufy Enterprises, 712 F. Supp. 1386 (N.D. Cal 1989)--
complaint to opinion: 973 days (2.6 years) (including eight-day trial); 
and United States v. Carilion Health System, 707 F. Supp. 840 (W.D. Va. 
1989)--complaint to opinion: 262 days (including twenty-six day trial). 
The Commission's new procedures entail a slightly longer period of time 
than the instances cited, because they contemplate both a trial and an 
administrative appellate process. Because an initial decision by an ALJ 
is followed by de novo review of the initial decision by the 
Commission, the longer time frame is necessary. The Commission believes 
this expedited time frame is both realistic and a reasonable period 
within which such adjudications should be resolved.
---------------------------------------------------------------------------

    \5\ Some of these cases involved a consolidation of both the 
preliminary and permanent injunction proceedings.
---------------------------------------------------------------------------

    In addition to the rule amendments announced today, the Commission 
has determined to implement the following two institutional 
improvements that are intended to make information more readily 
available to the public regarding both the agency's case management of 
its adjudicative docket and interlocutory rulings issued by ALJs in 
adjudicative proceedings. Neither procedure requires amendment to the 
agency's Rules of Practice. First, the Commission has directed that a 
quarterly status report reflecting the progress of pending 
adjudications before ALJs be made publicly available. Such reports 
would include, inter alia, the dates on which milestone events in a 
particular proceeding occurred (e.g., filing of the administrative 
complaint, respondent's answer, scheduling conference before the ALJ, 
issuance of the ALJ's scheduling order, close of discovery, final 
pretrial conference, commencement and conclusion of the evidentiary 
hearing, and filing of the ALJ's initial decision). The Commission has 
concluded that disclosure of information about the agency's 
adjudication program caseload would increase awareness of the 
importance of the program and promote public confidence in its 
efficiency and fairness. Similar status reports are prepared to 
describe the status of cases pending in federal district courts, in 
keeping with the provisions of the Civil Justice Reform Act of 1990. 28 
U.S.C. 476 (requiring semiannual reporting of, inter alia, bench trials 
and motions that have been submitted for more than six (6) months and 
the number of cases that have not been terminated within three years 
after filing).
    Second, the Commission has determined to make ALJ interlocutory 
orders in adjudicative proceedings more readily available to the 
public. Currently, some, but not all, ALJ interlocutory orders are 
widely available to the public through legal research resources. Recent 
technological advances will soon enable the agency to make significant 
ALJ interlocutory orders available to the public through electronic 
means via the Internet. Accordingly, the Commission has committed 
itself to making such interlocutory orders available to the public 
through such means during the next fiscal year.
    The specific rule amendments that the Commission is adopting at 
this time are as follows:

A. Imposing Tighter Deadlines

    1. Rule 3.12(a) is being amended to shorten the dead-line for the 
filing of an answer after service of the administrative complaint. The 
rule currently allows thirty (30) days for the filing of the answer. 
The revised rule shortens this period to twenty (20) days, in 
conformity with the Federal Rules of Civil Procedure (``Federal 
Rules''). See Fed. R. Civ. P. 12(a)(1)(A). The Commission believes 
twenty (20) days should be adequate, since the Commission sees no 
reason why an FTC complaint should take any longer to answer than does 
a federal court complaint.
    2. Rule 3.21 is being amended to require that the scheduling 
conference be held within seven (7) calendar days after filing of the 
answer, and that the scheduling order be issued by the ALJ within two 
(2) days thereafter. Since respondents in agency adjudications have 
already been on notice of the Commission's investigation, a week should 
be sufficient time for the parties to prepare for the preliminary 
matters to be discussed at the scheduling conference (e.g., general 
discovery plan, timetable for the proceeding). Similarly, no more than 
two (2) days, rather than the two (2) weeks currently allowed by the 
current rule, should be necessary for an ALJ to prepare and issue a 
scheduling order once the scheduling conference has concluded.
    3. Rule 3.51(a) is being amended to require explicitly that the ALJ 
file an initial decision within one (1) year of service of the 
administrative complaint. The ALJ is being permitted, however, in 
extraordinary circumstances to extend this deadline by up to a two-
month period, which may be extended upon expiration of that period by 
additional, consecutive periods of up to two (2) months, provided that 
for each such extension the ALJ finds that extraordinary circumstances 
continue to be present. The rule continues to require, however, that 
the ALJ issue an initial decision within ninety (90) days after the 
hearing record closes, or thirty (30) days after a default or the 
granting of a motion for summary decision or waiver by the parties of 
the filing of proposed findings of fact, conclusions of law, and order. 
Experience suggests that interim deadlines have not been completely 
successful in promoting the expeditious resolution of Part III cases. 
In the Commission's view, a one-year deadline for the initial decision 
is a realistic time frame for most adjudicative proceedings and would 
encourage ALJs to exercise more active control in managing cases from 
start to finish. The pendency of any collateral federal court 
proceeding that relates to the administrative adjudication will toll 
the one-year deadline for filing the initial decision. The 
administrative proceeding may be stayed until resolution of the 
collateral federal court proceeding.
    4. Rules 3.21 and 3.22(d) are being amended to (a) clarify the 
standard for obtaining extensions of deadlines established in the 
scheduling order, and (b) prohibit the ALJ from ruling on ex parte 
motions to extend such deadlines. Currently, such modifications are 
permitted only under a ``good cause'' standard. The rule is being 
amended to provide further guidance on this standard. Specifically, all 
motions to extend any deadline or time specified in the scheduling 
order are required to set forth the total period of extensions 
previously obtained by the moving party. In making a determination on 
such motions, ALJs will consider any extensions already granted, the 
length of the proceedings to date, and the need to conclude the 
evidentiary hearing and render an initial decision in a timely manner. 
Currently, Rule 3.22(d) permits the ALJ to rule on ex parte motions for 
extensions of time. Such rulings would no longer be permitted on the 
basis of ex parte motions under the amendments to Rules 3.21 and 
3.22(d), as set forth below.

[[Page 50643]]

B. Minimizing Discovery Delays

    1. Rule 3.21 is being revised to promote greater use of prehearing 
and status conferences where such conferences are not otherwise 
explicitly required by the Commission's rules. The Commission believes 
that such conferences facilitate the overall adjudicatory process by 
focusing the parties on the issues that are material to the case, 
promoting the exchange of relevant information, forestalling 
unnecessary and time-consuming motions, and providing a forum for 
resolving discovery disputes and exploring settlement options.
    2. Rule 3.21 is being amended to require that the counsel for the 
parties conduct a meeting (preferably, in person) with one another 
before the scheduling conference and also before their final prehearing 
conference with the ALJ. (The final prehearing conference is also a new 
requirement, as discussed infra.) The meeting before the scheduling 
conference is intended to provide the parties with an opportunity to 
discuss the possibility of settlement and to decide, if possible, on a 
proposed discovery schedule, the handling of pretrial motions, a 
preliminary estimate of the time required for the hearing, and a 
hearing date. This requirement is modeled upon Fed. R. Civ. P. 26(f), 
which requires that the parties meet before the scheduling conference 
and order. The meeting before the final prehearing conference is 
intended for the parties to discuss potential stipulations of law and 
fact, the admissibility of or objections to evidence, and the 
organization and exchange of exhibits, witness lists, and designated 
deposition testimony. This meeting should narrow the issues to be 
addressed at the final prehearing conference and help the ALJ plan an 
efficient evidentiary hearing.
    3. Current Rule 3.21(a) is being deleted to abolish the requirement 
that the parties each file a nonbinding statement before the scheduling 
conference, stating the anticipated issues, theories, and proof of the 
case. The requirement that parties provide a preliminary assessment of 
their case theories has not, in practice, demonstrably fulfilled its 
originally intended purpose in helping the ALJ manage cases and control 
discovery. 50 FR 41485, 41487 (Oct. 11, 1985). Although nonbinding 
statements are no longer being required by rule, ALJs will continue to 
retain their discretion, under the plenary power set forth in Rule 
3.42(c), to order that the parties file such statements if they would 
be useful in a particular case.
    4. Rule 3.31 is being revised, after redesignating certain 
paragraphs, to add a new paragraph (b) requiring that the parties make 
certain initial disclosures within five (5) days after the answer, 
without waiting for a formal discovery request. These disclosures would 
be similar to the initial disclosures required by Fed. R. Civ. P. 
26(a)(1) in federal court litigation. In particular, parties will be 
required to exchange the names, addresses, and telephone numbers of 
individuals likely to have discoverable information. The parties will 
also be required to exchange a copy, or a description by category and 
location, of all documents, data, and other tangible things in 
possession of the party that are relevant to disputed facts alleged in 
the pleadings. These initial disclosures are intended to expedite 
discovery by reducing the need for parties to request basic documents 
and other information.
    5. Rules 3.31, 3.33, 3.34, 3.35, 3.36, 3.37, and other Part III 
provisions are being revised to eliminate in substantial part the 
requirement that ALJs pre-authorize requests and subpoenas for 
depositions, interrogatories, documents, and access for inspection and 
other purposes before a party may serve such a request or subpoena. The 
elimination of ALJ pre-authorization includes discovery requests for 
access to documents in the possession, custody, or control of the 
Federal Trade Commission or its employees or for subpoenas requesting 
the appearance of an official or employee of the Commission. Since Rule 
3.31 already provides that parties may seek a protective order from a 
discovery or access request, and Rule 3.34 provides for motions to 
quash a subpoena, pre-authorization of discovery requests and subpoenas 
appears to be unnecessary to prevent abuse. See also 16 CFR 3.38A 
(withholding requested material). This revision is not intended to 
diminish the ALJ's authority to enlarge or limit the scope of 
discovery. See, e.g., Maremont Corp., 76 F.T.C. 1061, 1062, (1969) 
(discovery is primarily the responsibility of the ALJ and the 
Commission ``ordinarily will not dispute his rulings thereon''). The 
Commission notes that the Federal Rules of Civil Procedure do not 
require parties to obtain such authorization before they may make a 
discovery request. See, e.g., Fed. R. Civ. P. 30(a)(1) (taking 
testimony by deposition without leave of court). The Commission's rules 
will continue to require, however, that parties submit a written motion 
to the ALJ for subpoenas seeking the discovery of documents of other 
government agencies, or the appearance of employees of such 
agencies.\6\ See 16 CFR 3.36. Likewise, parties must continue to seek 
the prior approval of the ALJ to compel the attendance of a person to 
testify at an adjudicative hearing. See 16 CFR 3.34(a).
---------------------------------------------------------------------------

    \6\ The amended Rule 3.36 will continue to require that motions 
for discovery from other government agencies make a specific showing 
that the information or material sought cannot reasonably be 
obtained by other means. By eliminating ALJ pre-approval of 
discovery from the Commission, the amended rule eliminates the 
requirement that this showing be made for subpoenas for records of 
the Commission or for the appearance of Commission employees.
---------------------------------------------------------------------------

    6. Rule 3.31(b)(1) is being amended and redesignated as 3.31(c)(1) 
to strengthen the ALJs' authority to prevent abusive discovery tactics 
by limiting the frequency or extent of discovery under certain 
conditions (e.g., when it would be cumulative or duplicative). This 
amendment tracks in relevant part the language of Fed. R. Civ. P. 
26(b)(2), which sets forth similar limitations on discovery.
    7. Rule 3.31(a) is being amended to encourage simultaneous 
discovery by requiring its use whenever practicable. While the current 
rule does not preclude simultaneous discovery, it is practiced only 
sporadically in adjudicative proceedings. The Commission believes that 
simultaneous discovery prevents an unprepared party from hindering the 
overall progress of the case, while it allows a prepared party to move 
forward expeditiously.
    8. Rule 3.31 is also being amended to redesignate existing 
paragraphs to allow for the addition of a new paragraph (e), explicitly 
requiring that a party supplement its response to a discovery request 
when circumstances render the party's previous response incomplete or 
incorrect. This requirement, which is modeled, in part, on similar 
requirements in Fed. R. Civ. P. 26(e), is intended to promote greater 
candor and cooperation among parties by placing an affirmative burden 
on each party to ensure that its original response remains accurate and 
complete. Failure to observe this requirement may result in sanctions 
or an order to comply issued by the ALJ under Rule 3.38.
    9. The definition of the term ``documents'' in Rule 3.34(b) is 
being amended to incorporate technological advances in electronic 
communications and digital information storage.
    10. Rule 3.35(a)(1) is being amended to limit each party to twenty-
five (25) interrogatories, consistent with federal court practice. See 
Fed. R. Civ. P. 33. Limiting the number of interrogatories is intended 
to improve the efficiency of interrogatory practice and prevent the

[[Page 50644]]

overuse of interrogatories as a means of harassing another party or 
delaying discovery.
    11. Rule 3.35(a)(2) is being amended to establish a uniform thirty-
day period for parties to respond to interrogatories. Under the current 
rule, a respondent may take up to forty-five (45) days to respond from 
the date that the administrative complaint is served on that 
respondent, while other parties must respond within thirty (30) days 
from the date that the interrogatory is served. The amendment would 
eliminate the 45-day rule for respondents, which appears to have caused 
some confusion among practitioners. The amendment would also bring the 
Commission's rules in line with federal court practice, which requires 
that all parties, including the defendant, in a civil action respond 
within thirty (30) days of being served with an interrogatory. See Fed. 
R. Civ. P. 33(b)(3).

C. Minimizing Delay at Trial

    1. Rule 3.21 is being amended to require that the ALJ hold a final 
prehearing conference as close to the commencement of trail as 
reasonably practicable. See Fed. R. Civ. P. 16(d). At this conference, 
counsel will be required to submit any proposed stipulations of law, 
fact, or admissibility of evidence, exchange exhibit and witness lists, 
and designate testimony to be presented by deposition. The ALJ will 
also be required to resolve any outstanding evidentiary matters or 
pending motions (except motions for summary decision), and to establish 
a final schedule for the evidentiary hearing. In requiring that 
``counsel'' personally attend this conference, the Commission intends 
that at least one attorney for each party (preferably the attorney 
responsible for trying the case) appear; if not represented by an 
attorney, the party shall attend on the party's own behalf. 
Furthermore, as discussed earlier, counsel for the parties will be 
expected to consult with one another on these matters in a meeting 
(preferably, in person) prior to the final conference.
    2. Rule 3.43(b) is being amended to incorporate relevant language 
in Rules 403 and 611 of the Federal Rules of Evidence regarding the 
exclusion of cumulative evidence. The amended rule is intended to make 
clearer to litigants that the ALJ is empowered to exclude unduly 
repetitious, cumulative, and marginally relevant materials that merely 
burden the record and delay the trial. This clarification is intended 
to enhance the ALJ's ability to assemble a concise and manageable 
record.
    3. Rule 3.21 is being amended to require that the ALJ's scheduling 
orders include specific instructions on how the parties shall mark 
their exhibits. Such guidance is currently contained only in the FTC 
Operating Manual, which is primarily used for staff guidance. Requiring 
that such specific instructions be included in the scheduling order is 
intended to make them more directly available to the parties.

D. Filing of Documents and Motions

    1. Rule 3.22(a) is being amended to specify that copies of motions 
filed with the Secretary must also be provided promptly and directly to 
the ALJ. This amendment is intended to codify a practice that is well-
established in many federal courts and that many FTC practitioners 
already appear to follow.
    2. Rule 3.22(b) is being amended to require that all motions in 
adjudicative proceedings include the name, address, and telephone 
number of counsel, and attach a draft order containing the proposed 
relief. A conforming change is also being made to Rule 4.2, regarding 
filing requirements. The requirement that motions provide contact 
information and a draft order is intended to facilitate the 
administrative processing and disposition of motions, and is consistent 
with federal court practice. See, e.g., Fed. R. Civ. P. 7(b)(1) & 
11(a).
    3. Rule 3.25(b), governing motions to settle and withdraw a matter 
from adjudication, is being amended to underscore the requirement that 
such motions, like all motions in adjudicatory proceedings, be filed 
with the Office of the Secretary, pursuant to Commission Rule 4.2(a). 
One ALJ has observed that counsel sometimes submit their Rule 3.25(b) 
motions directly to him without filing them with the Secretary as 
required. The amendment complements existing Rule 3.25(c), under which 
the withdrawal of a matter from adjudication is not triggered until the 
Secretary receives the appropriate motion.
    4. Rule 3.24(a)(1) is being amended to require that a party moving 
for summary decision include a statement of the material facts as to 
which the party contends there is no genuine issue. The Commission 
notes that several local rules of federal courts require such 
statements. See, e.g., D.D.C. Local Rule 108(h); S.D.N.Y. Local Rule 
8(d); C.D. Cal. Local Rule 7.14; S.D. Fla. Local Rule 7.5. Changes are 
also being made in paragraphs (a)(2) and (a)(3) to make more explicit 
the existing requirement in paragraph (a)(3) that the opposing party 
provide a statement setting forth specific facts showing that there 
remains a genuine issue to be tried. See Fed. R. Civ. P. 56(e). 
Requiring that the moving and opposing parties provide statements is 
designed to expedite ALJ review of and rulings on summary decision 
motions.
    5. Rule 3.24(a)(1) is also being amended to permit complaint 
counsel to move for summary decision in twenty (20), rather than thirty 
(30), days after the complaint is issued, as specified under the 
current rule. The change mirrors the proposed amendment to Rule 
3.12(a), reducing the time to file an answer to the complaint from 
thirty (30) to twenty (20) days, as discussed earlier.
    6. Rule 3.22(d) is being revised to remove the ALJ's discretion to 
rule on ex parte requests for extensions of time. This change is also 
reflected in revised Rule 3.21, regarding modification of scheduling 
orders.

E. Miscellaneous

    1. Rule 3.11A is being added to establish an alternative ``fast 
track'' schedule that respondents in certain administrative proceedings 
may elect if a federal district court has granted a preliminary 
injunction in a collateral federal court proceeding brought by the 
Commission. Under the fast track schedule, the Commission shall, with 
limited exception, be prepared to issue a final order and opinion in 
such expedited proceedings within thirteen (13) months after the 
triggering event.
    2. Rule 3.44 is being amended to add new paragraph (c), requiring 
that ALJs formally close the hearing record immediately upon the close 
of the evidentiary hearing. A conforming change is also being made to 
Rules 3.46(a) 3.51(a). The Commission believes that little, if any, 
useful purpose is served by allowing the record to remain open after 
completion of the trial, and believes that it may contribute to 
adjudicatory delay. In requiring that ALJs close the record promptly at 
the end of the trial, the Commission does not intend, however, to alter 
or interfere with the procedures under paragraph (b) of the existing 
rule for post-trial corrections to the record as may be necessary, even 
after it has closed.
    3. Rules 2.8, 2.9, and 2.15 are being revised to terminate the 
currently prescribed use of ``presiding officials'' in investigational 
hearings. This practice is neither required by law nor necessary for 
the protection of witness' rights. By eliminating the use of presiding 
officials, the Commission seeks to avoid the erroneous perception that 
investigational hearings are conducted by persons with the same degree 
of authority and independence

[[Page 50645]]

that ALJs have in adjudicative proceedings.
    4. Rule 3.55 is being amended to shorten the time period for filing 
a petition for reconsideration. The current rule allows a party to file 
such a petition within twenty (20) days after service of the 
Commission's decision. By comparison, Federal Rule of Appellate 
Procedure 40 allows only fourteen (14) days, and the Commission 
believes that this time period should also be adequate for parties to 
file for reconsideration in a Commission adjudication.
    5. Rules 3.22(a) and 3.51 are being amended to delete language 
describing the procedure for filing documents containing in camera 
material and to substitute cross-references to Rule 3.45, which is also 
being amended to set forth the relevant in camera procedures and 
obligations in their entirety. These revisions are expected to reduce 
the confusion that may arise from duplicative instructions and to 
improve the litigants' understanding and observance of in camera 
procedures.
    These rule revisions relate solely to agency practice and, thus, 
are not subject to the notice and comment requirements of the 
Administrative Procedure Act, 5 U.S.C. 553(a)(2), nor to the 
requirements of the Regulatory Flexibility Act, 5 U.S.C. 601(2). The 
Paperwork Reduction Act does not apply to these requirements. 44 U.S.C. 
3518(c)(ii). Although the rule revisions are effective as stated in the 
previous section, the Commission welcomes comment on them and will 
consider further revision, as appropriate.

List of Subjects

16 CFR Part 2

    Administrative practice and procedure, Investigations, Reporting 
and recordkeeping requirements.

16 CFR Part 3

    Administrative practice and procedure, Claims, Equal access to 
justice, Lawyers.

16 CFR Part 4

    Administrative practice and procedure, Freedom of Information Act, 
Privacy Act, Sunshine Act.
    For the reasons set forth in the preamble, the Federal Trade 
Commission amends Title 16, Chapter I, Subchapter A of the Code of 
Federal Regulations, as follows:

PART 2--NONADJUDICATIVE PROCEDURES

    1. The authority for part 2 continues to read as follows:

    Authority: Sec. 6, 38 Stat. 721; 15 U.S.C. 46.

    2. Section 2.8 is amended by revising the first sentence of 
paragraph (b) to read as follows:

Sec. 2.8  Investigational hearings.

* * * * *
    (b) Investigational hearings shall be conducted by any Commission 
member, examiner, attorney, investigator, or other person duly 
designated under the FTC Act, for the purpose of hearing the testimony 
of witnesses and receiving documents and other data relating to any 
subject under investigation. * * *
* * * * *
    3. Section 2.9 is amended by revising the last sentence of 
paragraph (b)(4), all of paragraph (b)(5), and the first and second 
sentences of paragraph (b)(6) to read as follows:

Sec. 2.9  Rights of witnesses in investigations.

* * * * *
    (b) * * *
    (4) * * * Copies of such petitions may be filed as part of the 
record of the investigation with the person conducting the 
investigational hearing, but no arguments in support thereof will be 
allowed at the hearing.
    (5) Following completion of the examination of a witness, counsel 
for the witness may on the record request the person conducting the 
investigational hearing to permit the witness of clarify any of his or 
her answers. The grant or denial of such request shall be within the 
sole discretion of the person conducting the hearing.
    (6) The person conducting the hearing shall take all necessary 
action to regulate the course of the hearing to avoid delay and to 
prevent or restrain disorderly, dilatory, obstructionist, or 
contumacious conduct, or contemptuous language. Such person shall, for 
reasons stated on the record, immediately report to the Commission any 
instances where an attorney has allegedly refused to comply with his or 
her directions, or has allegedly engaged in disorderly, dilatory, 
obstructionist, or contumacious conduct, or contemptuous language in 
the course of the hearing. * * *
    4. Section 2.15 is amended by revising the last sentence of 
paragraph (b) to read:

Sec. 2.15  Orders requiring witnesses to testify or provide other 
information and granting immunity.

* * * * *
    (b) * * * The appeal shall not operate to suspend the hearing 
unless otherwise determined by the person conducting the hearing or 
ordered by the Commission.

PART 3--RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS

    5. The authority for part 3 continues to read as follows:

    Authority: Sec. 6, 38 Stat. 721 (15 U.S.C. 46), unless otherwise 
noted.

    6. Section 3.11A is added to read as follows:

Sec. 3.11A   Fast Track Proceedings.

    (a) Availability of Fast Track Proceedings. In certain 
administrative proceedings that have been designated by the Commission 
as appropriate for the fast track schedule, respondents may elect to 
have the proceeding adjudicated under the expedited schedule set forth 
in this section. In administrative proceedings involving multiple 
respondents, the fast track schedule shall be available only if all 
respondents elect it. The Commission shall designate whether the fast 
track schedule will be available at the time it authorizes Commission 
staff to seek a preliminary injunction in federal district court and 
shall provide notice of the defendant's option to elect the fast track 
procedures in the event that the Commission should initiate an 
administrative adjudication challenging some or all of the same conduct 
at issue in the federal court injunctive proceeding. Such notice shall 
be provided to the prospective respondent at the time it is notified of 
the Commission's action to authorize the filing of the preliminary 
injunction motion. In fast track proceedings, the Commission shall be 
prepared to issue a final order and opinion within thirteen (13) months 
after the latest of the following events (hereinafter ``triggering 
event''): Issuance of the Commission's administrative complaint; entry 
of a preliminary injunction by a federal court in a collateral 
proceeding against respondent brought by the Commission; or the date on 
which respondent elects the fast track procedure. The date for issuance 
of the Commission's final order and opinion in fast track proceedings 
may be amended by the Commission in the following circumstances: If the 
Commission's final order or opinion contains material or information 
designated for in camera treatment such that the agency is required to 
provide advance notification of such disclosure to submitters of in 
camera material or information; or if the Commission determines that 
adherence to the thirteen-month deadline would result in a miscarriage 
of justice due to circumstances unforeseen at the time of respondent's 
election of the fast track

[[Page 50646]]

proceeding. Only administrative proceedings challenging conduct that 
has been preliminarily enjoined by a federal court in a collateral 
proceeding brought by the Commission shall be subject to the fast track 
schedule. In the event the preliminary injunction in the collateral 
federal court proceeding is vacated, the Commission, in its discretion, 
may take such action as it deems appropriate in the administrative 
adjudication. Except as modified by this section, the rules contained 
in Subparts A through I of Part 3 of this chapter shall govern fast 
track procedures in adjudicative proceedings.
    (b) Election of Fast Track Proceedings. Respondents making an 
election under this section shall make such election by the later of 
either: Three (3) days after service of the administrative complaint 
challenging the merger or acquisition; or three (3) days after a 
federal district court grants the Commission's request for a 
preliminary injunction. Respondents electing fast track proceedings 
shall do so by filing a notice of election of such expedited 
proceedings with the Secretary.
    (c) Interim Deadlines in Fast Track Proceedings. The following 
deadlines shall govern all fast tract proceedings covered by this 
section:
    (1) The scheduling conference required by Sec. 3.21(b) shall be 
held not later than three (3) days after the triggering event.
    (2) Respondent's answer shall be filed within fourteen (14) days 
after the triggering event.
    (3) The ALJ shall file an initial decision within fifty-six (56) 
days following the conclusion of the evidentiary hearing. The initial 
decision shall be filed no later than one hundred ninety-five (195) 
days after the triggering event, pursuant to paragraph (a) of this 
section.
    (4) Any party wishing to appeal an initial decision to the 
Commission shall file a notice of appeal with the Secretary within 
three (3) days after service of the initial decision. The notice shall 
comply with Sec. 3.52(a) in all other respects.
    (5) The appeal shall be in the form of a brief, filed within 
twenty-one (21) days after service of the initial decision, and shall 
comply with Sec. 3.52(b) in all other respects.
    (6) Within fourteen (14) days after service of the appeal brief, 
the appellee may file an answering brief which shall comply with 
Sec. 3.52(c). Cross-appeals, as permitted in Sec. 3.52(c), may not be 
raised in an appellee's answering brief. All issues raised on appeal 
must be presented in the party's appeal brief and must be filed within 
the deadline specified in paragraphs (c)(4) and (c)(5) of this section.
    (7) Within five (5) days after service of the appellee's answering 
brief, the appellant may file a reply brief, in accordance with 
Sec. 3.52(d) in all other respects.
    (d) Discovery. Discovery shall be governed by Subpart D of this 
part. The ALJ may establish limitations on the number of depositions, 
witnesses, or any document production, pursuant to his plenary 
authority under Sec. 3.42(c)(6).
    7. Section 3.12 is amended by revising the introductory text of 
paragraph (a) to read as follows:

Sec. 3.12  Answer to complaint.

    (a) Time for filing. A respondent shall file an answer within 
twenty (20) days after being served with the complaint: Provided, 
however, That the filing of a motion for a more definite statement of 
the charges shall alter this period of time as follows, unless a 
different time is fixed by the Administrative Law Judge: * * *
* * * * *
    8. Section 3.21 is amended by redesignating paragraph (e) as new 
paragraph (g), revising paragraphs (a) through (d), and adding new 
paragraphs (e) and (f), to read as follows:

Sec. 3.21  Prehearing procedures.

    (a) Meeting of the parties before scheduling conference. An early 
as practicable before the prehearing scheduling conference described in 
paragraph (b) of this section, counsel for the parties shall meet to 
discuss the nature and basis of their claims and defenses and the 
possibilities for a prompt settlement or resolution of the case, and to 
agree, if possible, on a proposed discovery schedule, a preliminary 
estimate of the time required for the hearing, and a proposed hearing 
date, and on any other matters to be determined at the scheduling 
conference.
    (b) Scheduling conference. Not later than seven (7) days after the 
answer is filed by the last answering respondent, the Administrative 
Law Judge shall hold a scheduling conference. At the scheduling 
conference, counsel for the parties shall be prepared to address their 
factual and legal theories, a schedule of proceedings, possible 
limitations on discovery, and other possible agreements or steps that 
may aid in the orderly and expeditious disposition of the proceeding.
    (c) Prehearing scheduling order. (1) Not later than two (2) days 
after the scheduling conference, the Administrative Law Judge shall 
enter an order that sets forth the results of the conference and 
establishes a schedule of proceedings, including a plan of discovery, 
dates for the submission and hearing of motions, the specific method by 
which exhibits shall be numbered or otherwise identified and marked for 
the record, and the time and place of a final prehearing conference and 
of the evidentiary hearing.
    (2) The Administrative Law Judge may grant a motion to extend any 
deadline or time specified in this scheduling order only upon a showing 
of good cause. Such motion shall set forth the total period of 
extensions, if any, previously obtained by the moving party. In 
determining whether to grant the motion, the Administrative Law Judge 
shall consider any extensions already granted, the length of the 
proceedings to date, and the need to conclude the evidentiary hearing 
and render an initial decision in a timely manner. The Administrative 
Law Judge shall not rule on ex parte motions to extend the deadlines 
specified in the scheduling order, or modify such deadlines solely upon 
stipulation or agreement of counsel.
    (d) Meeting prior to final prehearing conference. Counsel for the 
parties shall meet before the final prehearing conference described in 
paragraph (e) of this section to discuss the matters set forth therein 
in preparation for the conference.
    (e) Final prehearing conference. As close to the commencement of 
the evidentiary hearing as practicable, the Administrative Law Judge 
shall hold a final prehearing conference, which counsel shall attend in 
person, to submit any proposed stipulations as to law, fact, or 
admissibility of evidence, exchange exhibit and witness lists, and 
designate testimony to be presented by deposition. At this conference, 
the Administrative Law Judge shall also resolve any outstanding 
evidentiary matters or pending motions (except motions for summary 
decision) and establish a final schedule for the evidentiary hearing.
    (f) Additional prehearing conferences and orders. The 
Administrative Law Judge shall hold additional prehearing and status 
conferences or enter additional orders as may be needed to ensure the 
orderly and expeditious disposition of a proceeding. Such conferences 
shall be held in person to the extent practicable.
    (g) Public access and reporting. * * *
    9. Section 3.22 is amended by revising paragraphs (a) and (d), the 
last sentence of paragraph (e), and the first full sentence of 
paragraph (f), to read as follows:

[[Page 50647]]

Sec. 3.22  Motions.

    (a) Presentation and disposition. During the time a proceeding is 
before an Administrative Law Judge, all motions therein, except those 
filed under Sec. 3.26, Sec. 3.42(g), or Sec. 4.17, shall be addressed 
to and ruled upon, if within his or her authority, by the 
Administrative Law Judge. The Administrative Law Judge shall certify to 
the Commission any motion upon which he or she has no authority to 
rule, accompanied by any recommendation that he or she may deem 
appropriate. Such recommendation may contain a proposed disposition of 
the motion or other relevant comments. The Commission may order the ALJ 
to submit a recommendation or an amplification thereof. Rulings or 
recommendations containing information granted in camera status 
pursuant to Sec. 3.45 shall be filed in accordance with Sec. 3.45(f). 
All written motions shall be filed with the Secretary of the 
Commission, and all motions addressed to the Commission shall be in 
writing. The moving party shall also provide a copy of its motion to 
the Administrative Law Judge at the time the motion is filed with the 
Secretary.
* * * * *
    (d) Motions for extensions. The Administrative Law Judge or the 
Commission may waive the requirements of this section as to motions for 
extensions of time; however, the Administrative Law Judge shall have no 
authority to rule on ex parte motions for extensions of time.
    (e) Rules on motions for dismissal. * * * When a motion to dismiss 
is made at the close of the evidence offered in support of the 
complaint based upon an alleged failure to establish a prima facie 
case, the Administrative Law Judge may defer ruling thereon until 
immediately after all evidence has been received and the hearing record 
is closed.
    (f) Statement. Each motion to quash filed pursuant to Sec. 3.34(c), 
each motion to compel or determine sufficiency pursuant to 
Sec. 3.38(a), each motion for sanctions pursuant to Sec. 3.38(b), and 
each motion for enforcement pursuant to Sec. 3.38(c) shall be 
accompanied by a signed statement representing that counsel for the 
moving party has conferred with opposing counsel in an effort in good 
faith to resolve by agreement the issues raised by the motion and has 
been unable to reach such an agreement. * * *
    10. Section 3.24 is amended by revising paragraph (a)(1) and adding 
a sentence between the existing first and second sentences of paragraph 
(a)(2) to read as follows:

Sec. 3.24  Summary decisions.

    (a) Procedure. (1) Any party to an adjudicatory proceeding may 
move, with or without supporting affidavits, for a summary decision in 
the party's favor upon all or any part of the issues being adjudicated. 
The motion shall be accompanied by a separate and concise statement of 
the material facts as to which the moving party contends there is not 
genuine issue. Counsel in support of the complaint may so move at any 
time after twenty (20) days following issuance of the complaint and any 
party respondent may so move at any time after issuance of the 
complaint. Any such motion by any party, however, shall be filed in 
accordance with the scheduling order issued pursuant to Sec. 3.21, but 
in any case at least twenty (20) days before the date fixed for the 
adjudicatory hearing.
    (2) * * * The opposing party shall include a separate and concise 
statement of those material facts as to which the opposing party 
contends there exists a genuine issue for trial, as provided in 
Sec. 3.24(a)(3). * * *
* * * * *
    11. Section 3.25 is amended by adding a new sentence between the 
first and second sentences of paragraph (b) to read:

Sec. 3.25  Consent agreement settlements.

* * * * *
    (b) * * * Such motion shall be filed with the Secretary of the 
Commission, as provided in Sec. 4.2. * * *
* * * * *
    12. Section 3.31 is amended by: adding a new sentence to the end of 
paragraph (a); redesignating paragraphs (b), (c), (d), and (e) as 
paragraphs (c), (d), (f), and (g), respectively; adding new paragraphs 
(b) and (e); revising newly redesignated paragraphs (c)(1), (c)(2), the 
first full sentence of (c)(3), the introductory text of newly 
redesignated paragraph (c)(4)(i), and newly redesignated paragraph 
(c)(4)(iii); revising the paragraph heading and adding a new sentence 
at the end of newly redesignated paragraph (d)(1); and revising newly 
redesignated paragraph (g), to read as follows:

Sec. 3.31  General provisions.

    (a) * * * The parties shall, to the greatest extent practicable, 
conduct discovery simultaneously; the fact that a party is conducting 
discovery shall not operate to delay any other party's discovery.
    (b) Initial disclosures. Complaint counsel and respondent's counsel 
shall, within five (5) days of receipt of a respondent's answer to the 
complaint and without awaiting a discovery request, provide to each 
other:
    (1) The name, and, if known, the address and telephone number of 
each individual likely to have discoverable information relevant to the 
allegations of the Commission's complaint, to the proposed relief, or 
to the defenses of the respondent, as set forth in Sec. 3.31(c)(1);
    (2) A copy of, or a description by category and location of, all 
documents, data compilations, and tangible things in the possession, 
custody, or control of the Commission or respondent(s) that are 
relevant to the allegations of the Commission's complaint, to the 
proposed relief, or to the defenses of the respondent, as set forth in 
Sec. 3.31(c)(1); unless such information or materials are privileged as 
defined in Sec. 3.31(c)(2), pertain to hearing preparation as defined 
in Sec. 3.31(c)(3), pertain to experts as defined in Sec. 3.31(c)(4), 
or are obtainable from some other source that is more convenient, less 
burdensome, or less expensive. A party shall make its disclosures based 
on the information then reasonably available to it and is not excused 
from making its disclosures because it has not fully completed its 
investigation.
    (c) Scope of discovery. * * *
    (1) In general; limitations. Parties may obtain discovery to the 
extent that it may be reasonably expected to yield information relevant 
to the allegations of the complaint, to the proposed relief, or to the 
defenses of any respondent. Such information may include the existence, 
description, nature, custody, condition and location of any books, 
documents, or other tangible things and the identity and location of 
persons having any knowledge of any discoverable matter. Information 
may not be withheld from discovery on grounds that the information will 
be inadmissible at the hearing if the information sought appears 
reasonably calculated to lead to the discovery of admissible evidence. 
The frequency or extent of use of the discovery methods otherwise 
permitted under these rules shall be limited by the Administrative Law 
Judge if he determines that:
    (i) The discover sought is unreasonably cumulative or duplicative, 
or is obtainable from some other source that is more convenient, less 
burdensome, or less expensive;
    (ii) The party seeking discovery has had ample opportunity by 
discovery in the action to obtain the information sought; or
    (iii) The burden and expense of the proposed discovery outweigh its 
likely benefit.

[[Page 50648]]

    (2) Privilege. The Administrative Law Judge may enter a protective 
order denying or limiting discovery to preserve the privilege of a 
witness, person, or governmental agency as governed by the 
Constitution, any applicable act of Congress, or the principles of the 
common law as they may be interpreted by the Commission in the light of 
reason and experience.
    (3) Hearing preparations: Materials. Subject to the provisions of 
paragraph (c)(4) of this section, a party may obtain discovery of 
documents and tangible things otherwise discoverable under paragraph 
(c)(1) of this section and prepared in anticipation of litigation or 
for hearing by or for another party or by or for that other party's 
representative (including the party's attorney, consultant, or agent) 
only upon a showing that the party seeking discovery has substantial 
need of the materials in the preparation of its case and that the party 
is unable without undue hardship to obtain the substantial equivalent 
of the materials by other means. * * *
    (4) Hearing preparation: Experts. (i) Discovery of facts known and 
opinions held by experts, otherwise discoverable under the provisions 
of paragraph (c)(1) of this section and acquired or developed in 
anticipation of litigation or for hearing, may be obtained only as 
follows: * * *
    (ii) * * *
    (iii) The Administrative Law Judge may require as a condition of 
discovery that the party seeking discovery pay the expert a reasonable 
fee, but not more than the maximum specified in 5 U.S.C. 3109 unless 
the parties have stipulated a higher amount, for time spent in 
responding to discovery under paragraphs (c)(4)(i)(B) and (c)(4)(ii) of 
this section.
    (d) Protective orders; order to preserve evidence. (1) * * * Such 
an order may also be issued to preserve evidence upon a showing that 
there is substantial reason to believe that such evidence would not 
otherwise be available for presentation at the hearing.
    (2) * * *
    (e) Supplementation of disclosures and responses. A party who has 
made an initial disclosure under Sec. 3.31(b) or responded to a request 
for discovery with a disclosure or response is under a duty to 
supplement or correct the disclosure or response to include information 
thereafter acquired if ordered by the Administrative Law Judge or in 
the following circumstances:
    (1) A party is under a duty to supplement at appropriate intervals 
its initial disclosures under Sec. 3.31(b) if the party learns that in 
some material respect the information disclosed is incomplete or 
incorrect and if the additional or corrective information has not 
otherwise been made known to the other parties during the discovery 
process or in writing.
    (2) A party is under a duty seasonably to amend a prior response to 
an interrogatory, request for production, or request for admission if 
the party learns that the response is in some material respect 
incomplete or incorrect.
    (f) Stipulations. * * *
    (g) Ex parte rulings on applications for compulsory process. 
Applications for the issuance of subpoenas to compel testimony at an 
adjudicative hearing pursuant to Sec. 3.34 may be made ex parte, and, 
if so made, such applications and rulings thereon shall remain ex parte 
unless otherwise ordered by the Administrative Law Judge or the 
Commission.
    13. Section 3.33 is amended by revising paragraph (a), the first 
and second full sentences of paragraph (c), and the introductory text 
of paragraph (e), and by removing and reserving paragraph (b), to read 
as follows:

Sec. 3.33   Depositions.

    (a) In general. Any party may take a deposition of a named person 
or of a person or persons described with reasonable particularity, 
provided that such deposition is reasonably expected to yield 
information within the scope of discovery under Sec. 3.31(c)(1). Such 
party may, by motion, obtain from the Administrative Law Judge an order 
to preserve relevant evidence upon a showing that there is substantial 
reason to believe that such evidence would not otherwise be available 
for presentation at the hearing. Depositions may be taken before any 
person having power to administer oaths, either under the law of the 
United States or of the state or other place in which the deposition is 
taken, who may be designated by the party seeking the deposition, 
provided that such person shall have no interest in the outcome of the 
proceeding. The party seeking the deposition shall serve upon each 
person whose deposition is sought and upon each party to the proceeding 
reasonable notice in writing of the time and place at which it will be 
taken, and the name and address of each person or persons to be 
examined, if known, and if the name is not known, a description 
sufficient to identify them.
    (b) [Reserved]
    (c) Notice to corporation or other organization. A party may name 
as the deponent a public or private corporation, partnership, 
association, governmental agency other than the Federal Trade 
Commission, or any bureau or regional office to the Federal Trade 
Commission, and describe with reasonable particularity the matters on 
which examination is requested. The organization so names shall 
designate one or more officers, directors, or managing agents, or other 
persons who consent to testify on its behalf, and may set forth, for 
each person designated, the matters on which he will testify. * * *
* * * * *
    (e) Depositions upon written questions. A party desiring to take a 
deposition upon written questions shall serve them upon every other 
party with a notice stating: * * *
* * * * *
    14. Section 3.34 is amended by revising paragraphs (a) and (b), and 
by revising the paragraph heading and adding a new sentence to the end 
of existing paragraph (c), to read as follows:

Sec. 3.34   Subpoenas.

    (a) Subpoenas ad testificandum--(1) Prehearing. The Secretary of 
the Commission shall issue a subpoena, signed but otherwise in blank, 
requiring a person to appear and give testimony at the taking of a 
deposition to a party requesting such subpoena, who shall complete it 
before service.
    (2) Hearing. Application for issuance of a subpoena commanding a 
person to attend and give testimony at an adjudicative hearing shall be 
made in writing to the Administrative Law Judge. Such subpoena may be 
issued upon a showing of the reasonable relevancy of the expected 
testimony.
    (b) Subpoenas duces tecum; subpoenas to permit inspection of 
premises. The Secretary of the Commission, upon request of a party, 
shall issue a subpoena, signed but otherwise in blank, commanding a 
person to produce and permit inspection and copying of designated 
books, documents, or tangible things, or commanding a person to permit 
inspection of premises, at a time and place therein specified. The 
subpoena shall specify with reasonable particularity the material to be 
produced. The person commanded by the subpoena need not appear in 
person at the place of production or inspection unless commanded to 
appear for a deposition or hearing pursuant to paragraph (a) of this 
section. As used herein, the term ``documents'' includes writings, 
drawings, graphs, charts, handwritten notes, film, photographs, audio 
and video recordings and any such representations stored on a computer, 
a computer disk, CD-ROM, magnetic or electronic tape, or any other

[[Page 50649]]

means of electronic storage, and other data compilations from which 
information can be obtained in machine-readable form (translated, if 
necessary, into reasonably usable form by the person subject to the 
subpoena). A subpoena duces tecum may be used by any party for purposes 
of discovery, for obtaining documents for use in evidence, or for both 
purposes, and shall specify with reasonable particularity the materials 
to be produced.
    (c) Motions to quash; limitation on subpoenas to other government 
agencies. * * * Nothing in paragraphs (a) and (b) of this section 
authorizes the issuance of subpoenas requiring the appearance of, or 
the production of documents in the possession, custody, or control of, 
an official or employee of a governmental agency other than the 
Commission, which may be authorized only in accordance with Sec. 3.36.
    15. Section 3.35 is amended by revising the first sentence of 
paragraph (a)(1), the third sentence of paragraph (a)(2), and paragraph 
(b)(1) to read as follows:

Sec. 3.35  Interrogatories to parties.

    (a) Availability; procedures for use. (1) Any party may serve upon 
any other party written interrogatories, not exceeding twenty-five (25) 
in number, including all discrete subparts, to be answered by the party 
served or, if the party served is a public or private corporation, 
partnership, association or governmental agency, by any officer or 
agent, who shall furnish such information as is available to the party. 
* * *
    (2) * * * The party upon whom the interrogatories have been served 
shall serve a copy of the answers, and objections, if any, within 
thirty (30) days after the service of the interrogatories. * * *
    (b) Scope; use at hearing. (1) Interrogatories may relate to any 
matters that can be inquired into under Sec. 3.31(c)(1), and the 
answers may be used to the extent permitted by the rules of evidence.
* * * * *
    16. Section 3.36 is revised to read as follows:

Sec. 3.36  Applications for subpoenas for records, or appearances by 
officials or employees, of governmental agencies other than the 
Commission.

    (a) Form. An application for issuance of a subpoena for the 
production of documents, as defined in Sec. 3.34(b), or for the 
issuance of a subpoena requiring access to documents or other tangible 
things, for the purposes described in Sec. 3.37(a), in the possession, 
custody, or control of a governmental agency other than the Commission 
or the officials or employees of such other agency, or for the issuance 
of a subpoena requiring the appearance of an official or employee of 
another governmental agency, shall be made in the form of a written 
motion filed in accordance with the provisions of Sec. 3.22(a). No 
application for records pursuant to Sec. 4.11 of this chapter or the 
Freedom of Information Act may be filed with the Administrative Law 
Judge.
    (b) Content. The motion shall satisfy the same requirements for a 
subpoena under Sec. 3.34 or a request for production or access under 
Sec. 3.37, together with a specific showing that:
    (1) the material sought is reasonable in scope;
    (2) if for purposes of discovery, the material falls within the 
limits of discovery under Sec. 3.31(b)(1), or, if for an adjudicative 
hearing, the material is reasonably relevant; and
    (3) the information or material sought cannot reasonably be 
obtained by other means.
    17. Section 3.37 is revised to read as follows:

Sec. 3.37  Production of documents and things; access for inspection 
and other purposes.

    (a) Availability; procedures for use. Any party may serve on 
another party a request: to produce and permit the party making the 
request, or someone acting on the party's behalf, to inspect and copy 
any designated documents, as defined in Sec. 3.34(b), or to inspect and 
copy, test, or sample any tangible things which are within the scope of 
Sec. 3.31(c)(1) and in the possession, custody or control of the party 
upon whom the request is served; or to permit entry upon designated 
land or other property in the possession or control of the party upon 
whom the order would be served for the purpose of inspection and 
measuring, surveying, photographing, testing, or sampling the property 
or any designated object or operation thereon, within the scope of 
Sec. 3.31(c)(1). Each such request shall specify with reasonable 
particularity the documents or things to be inspected, or the property 
to be entered. Each such request shall also specify a reasonable time, 
place, and manner of making the inspection and performing the related 
acts. A party shall make documents available as they are kept in the 
usual course of business or shall organize and label them to correspond 
with the categories in the request. A person not a party to the action 
may be compelled to produce documents and things or to submit to an 
inspection as provided in Sec. 3.34.
    (b) Response; objections. The response of the party upon whom the 
request is served shall state, with respect to each item or category, 
that inspection and related activities will be permitted as requested, 
unless the request is objected to, in which event the reasons for the 
objection shall be stated. If objection is made to part of an item or 
category, the part shall be specified and inspection permitted of the 
remaining parts. The party submitting the request may move for an order 
under Sec. 3.38(a) with respect to any objection to or other failure to 
respond to the request or any part thereof, or any failure to permit 
inspection as requested.
    18. Section 3.38 is amended by revising the section heading and 
paragraph (a) to read as follows:

Sec. 3.38  Motion for order compelling disclosure or discovery; 
sanctions.

    (a) Motion for order to compel. A party may apply by motion to the 
Administrative Law Judge for an order compelling disclosure or 
discovery, including a determination of the sufficiency of the answers 
or objections with respect to the initial disclosures required by 
Sec. 3.31(b), a request for admission under Sec. 3.32, a deposition 
under Sec. 3.33, or an interrogatory under Sec. 3.35.
    (1) Initial disclosures; requests for admission; depositions; 
interrogatories. Unless the objecting party sustains its burden of 
showing that the objection is justified, the Administrative Law Judge 
shall order that an answer be served or disclosure otherwise be made. 
If the Administrative Law Judge determines that an answer or other 
response by the objecting party does not comply with the requirements 
of these rules, he may order either that the matter is admitted or that 
an amended answer or response be served. The Administrative Law Judge 
may, in lieu of these orders, determine that final disposition may be 
made at a prehearing conference or at a designated time prior to trial.
    (2) Requests for production or access. If a party fails to respond 
to or comply as requested with a request for production or access made 
under Sec. 3.37(a), the discovering party may move for an order to 
compel production or access in accordance with the request.
* * * * *
    19. Section 3.38A is amended by revising the first sentence of 
paragraph (a) to read as follows:

[[Page 50650]]

Sec. 3.38A  Withholding requested material.

    (a) Any person withholding material responsive to a subpoena issued 
pursuant to Sec. 3.34, written interrogatories requested pursuant to 
Sec. 3.35, a request for production or access pursuant to Sec. 3.37, or 
any other request for the production of materials under this part, 
shall assert a claim of privilege or any similar claim not later than 
the date set for production of the material. * * *
* * * * *
    20. Section 3.43 is amended by revising paragraph (b) to read as 
follows:

Sec. 3.43  Evidence.

* * * * *
    (b) Admissibility; exclusion of relevant evidence; mode and order 
of interrogation and presentation. Relevant, material, and reliable 
evidence shall be admitted. Irrelevant, immaterial, and unreliable 
evidence shall be excluded. Evidence, even if relevant, may be excluded 
if its probative value is substantially outweighed by the danger of 
unfair prejudice, confusion of the issues, or if the evidence would be 
misleading, or by considerations of undue delay, waste of time, or 
needless presentation of cumulative evidence. The Administrative Law 
Judge shall exercise reasonable control over the mode and order of 
interrogating witnesses and presenting evidence so as to
    (1) make the interrogation and presentation effective for the 
ascertainment of the truth,
    (2) avoid needless consumption of time, and
    (3) protect witnesses from harassment or undue embarrassment.
* * * * *
    21. Section 3.44 is amended by adding a new paragraph (c) to read 
as follows:

Sec. 3.44  Record.

* * * * *
    (c) Closing of the hearing record. Immediately upon completion of 
the evidentiary hearing, the Administrative Law Judge shall issue an 
order closing the hearing record. The Administrative Law Judge shall 
retain the description to permit or order correction of the record as 
provided in Sec. 3.44(b).
    22. Section 3.45 is amended by adding a new paragraph (f) to read 
as follows:

Sec. 3.45  In camera orders.

* * * * *
    (f) When in camera information is included in rulings or 
recommendations of the Administrative Law Judge. If the Administrative 
Law Judge includes in any ruling or recommendation information that has 
been granted in camera status pursuant to Sec. 3.45(b), the 
Administrative Law Judge shall file two versions of the ruling or 
recommendation. A complete version shall be marked ``In Camera'' on the 
first page and shall be serve upon the parties. The complete version 
will be placed in the in camera record of the proceeding. An expurgated 
version, to be filed within five (5) days after the filing of the 
complete version, shall omit the in camera information that appears in 
the complete version, shall be marked ``Public Record'' on the first 
page, shall be served upon the parties, and shall be included in the 
public record of the proceeding.
    23. Section 3.46 is amended by revising the first full sentence of 
paragraph (a) to read as follows:

Sec. 3.46  Proposed findings, conclusions, and order.

    (a) General. Upon the closing of the hearing record, or within a 
reasonable time thereafter fixed by the Administrative Law Judge, any 
party may file with the Secretary of the Commission for consideration 
of the Administrative Law Judge proposed findings of fact, conclusions 
of law, and rule or order, together with reasons therefor and briefs in 
support thereof. * * *
* * * * *
    24. Section 3.51 is amended by revising paragraph (a) and paragraph 
(c)(1) to read as follows:

Sec. 3.51  Initial decision.

    (a) When filed and when effective. The Administrative Law Judge 
shall file an initial decision within ninety (90) days after closing 
the hearing record pursuant to Sec. 3.44(c), or within thirty (30) days 
after a default or the granting of a motion for summary decision or 
waiver by the parties of the filing of proposed findings of fact, 
conclusions of law and order, or within such further time as the 
Commission may by order allow upon written request from the 
Administrative Law Judge. In no event shall the initial decision be 
filed any later than one (1) year after the issuance of the 
administrative compliant, except that the Administrative Law Judge may, 
upon a finding of extraordinary circumstances, extend the one-year 
deadline for a period of up to sixty (60) days. Such extension, upon 
its expiration, may be continued for additional consecutive periods of 
up to sixty (60) days, provided that each additional period is based 
upon a finding by the Administrative Law Judge that extraordinary 
circumstances are still present. The pendency of any collateral federal 
court proceeding that relates to the administrative adjudication shall 
toll the one-year deadline for filing the initial decision. The ALJ may 
stay the administrative proceeding until resolution of the collateral 
federal court proceeding. Once issued, the initial decision shall 
become the decision of the Commission thirty (30) days after service 
thereof upon the parties or thirty (30) days after the filing of a 
timely notice of appeal, whichever shall be later, unless a party 
filing such a notice shall have perfected an appeal by the timely 
filing of an appeal brief or the Commission shall have issued an order 
placing the case on its own docket for review or staying the effective 
date of the decision.
    (b) * * *
    (c) Content. (1) The initial decision shall include a statement of 
findings (with specific page references to principal supporting items 
of evidence in the record) and conclusions, as well as the reasons or 
basis therefor, upon all the material issues of fact, law, or 
discretion presented on the record (or those designated under paragraph 
(c)(2) of this section) and an appropriate rule or order. Rulings 
containing information granted in camera status pursuant to Sec. 3.45 
shall be filed in accordance with Sec. 3.45(f).
* * * * *
    25. Section 3.55 is amended by revising the first sentence to read 
as follows:

Sec. 3.55  Reconsideration.

    Within fourteen (14) days after completion of service of a 
Commission decision, any party may file with the Commission a petition 
for reconsideration of such decision, setting forth the relief desired 
and the grounds in support thereof. * * *

PART 4--MISCELLANEOUS RULES

    26. The authority for Part 4 continues to read as follows:

    Authority: Sec. 6, 38 Stat. 721; 15 U.S.C. 46.

    27. Section 4.2 is amended by adding a new sentence at the end of 
paragraph (c) and a new sentence at the end of paragraph (e)(1) to read 
as follows:

Sec. 4.2  Requirements as to form, and filing of documents other than 
correspondence.

* * * * *
    (c) Copies. * * * With respect to motions under Sec. 3.22, the 
moving party shall provide a copy of its motion to the Administrative 
Law Judge at the time the motion is filed with the Secretary.
* * * * *

[[Page 50651]]

    (e) Signature. (1) * * * In addition, motions filed pursuant to 
Sec. 3.22 shall include the name, address, and telephone number of 
counsel.

    By direction of the Commission.
Donald S. Clark,
Secretary.

Concurring Statement of Commissioner Mary L. Azcuenaga

Amendment of the Commission's Procedural Rules Governing 
Adjudicative Proceedings

    The Commission today amends its procedural rules governing 
administrative adjudications. I welcome the amended rules as a first 
step in reforming the Commission's adjudicative process. Some of the 
amendments seem clearly to be good ideas and the others may be worth 
a try to help expedite the Commission's adjudicative proceedings. 
Whether they will result in net benefits remains to be seen. 
Although rule changes to expedite adjudications are a starting point 
for improving the adjudicative process, reform ultimately should 
focus on improving the quality of the adjudicative record and of 
adjudicative decisions to help ensure that they meet the test of 
appeal.
    I support further examination of the entire process, including 
how to focus discovery and hearings more precisely on the pertinent 
facts, and how best to prepare the record for efficient use in 
formulating reasoned and well supported decisions. I look forward to 
the next installment of this effort.

[FR Doc. 96-24316 Filed 9-25-96; 8:45 am]
BILLING CODE 6750-01-M

Complete official Federal Register PDF

FR Doc. 96-24105 Procedures for Implementation of the Fastener Quality Act
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50538-50581]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24105]

[[Page 50537]]

_______________________________________________________________________

Part II

Department of Commerce

_______________________________________________________________________

National Institute of Standards and Technology

_______________________________________________________________________

15 CFR Part 280

Fastener Quality Act Implementation Procedures; Final Rule; 
Accreditation Body Evaluation and NIST Fastener Laboratory 
Accreditation Programs and Consensus Standards Organization Under the 
Fastener Quality Act; Notices

Federal Register / Vol. 61, No. 188 / Thursday, September 26, 1996 / 
Rules and Regulations

[[Page 50538]]

DEPARTMENT OF COMMERCE

National Institute of Standards and Technology

15 CFR Part 280

[Docket No: 960726209-6209-01]
RIN 0693-AA90

Procedures for Implementation of the Fastener Quality Act

AGENCY: National Institute of Standards and Technology, Commerce.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The National Institute of Standards and Technology (NIST) is 
today issuing a final rule to implement the Fastener Quality Act (the 
Act). The Act protects the public safety by: Requiring that certain 
fasteners which are sold in commerce conform to the specifications to 
which they are represented to be manufactured, providing for 
accreditation of laboratories engaged in fastener testing; and 
requiring inspection, testing and certification, in accordance with 
standardized methods, of fasteners covered by the Act.
    The Secretary of Commerce, acting through the Director of the 
National Institute of Standards and Technology (NIST), is implementing 
the Act by establishing these procedures, under which: Laboratories in 
compliance with the Act may be listed; laboratories may apply to NIST 
for accreditation; private laboratory accreditation entities (bodies) 
may apply to NIST for approval to accredit laboratories; and foreign 
laboratories accredited by their governments or by organizations 
recognized by the NIST Director under section 6(a)(1)(C) of the Act can 
be deemed to satisfy the laboratory accreditation requirements of the 
Act. The regulation also establishes, within the Patent and Trademark 
Office (PTO), a recordation system to identify the manufacturers or 
distributors of covered fasteners to ensure that the fasteners may be 
traced to their manufacturers or private label distributors. In 
addition, the regulations contain provisions on enforcement, civil 
penalties, and hearing and appeal procedures.

DATES: This rule is effective November 25, 1996.

FOR FURTHER INFORMATION CONTACT: For subpart A: Dr. Subhas Malghan, FQA 
Program Manager, Technology Services, National Institute of Standards 
and Technology, Building 820, Room 311, Gaithersburg, MD 20899, 
telephone number (301) 975-4510; for subparts B and C: James L. Cigler, 
Chief, National Voluntary Laboratory Accreditation Program, NIST, (301) 
975-4171; for subparts D, E, and F: Robert L. Gladhill, Global 
Standards Policy Program, NIST, (301) 975-4273; for subpart G: William 
H. Arvin, Special Assistant to the Assistant Secretary for Export 
Enforcement, (202) 482-1564; and for subpart H: Lizbeth Kulick, 
Trademark Legal Administrator, Patent and Trademark Office, (703) 308-
8900.

SUPPLEMENTARY INFORMATION:
    As required by section 13 of the Fastener Quality Act (the Act), 
the National Institute of Standards and Technology (NIST) is today 
issuing a final rule to implement that Act. The Act protects the public 
safety by: (1) Requiring that certain fasteners which are sold in 
commerce conform to the specifications to which they are represented to 
be manufactured, (2) providing for accreditation of laboratories 
engaged in fastener testing; and (3) requiring inspection, testing and 
certification, in accordance with standardized methods, of fasteners 
covered by the Act.
    The Secretary of Commerce, acting through NIST, is implementing the 
Act by establishing these procedures, under which: (1) Laboratories in 
compliance with the Act may be listed; (2) laboratories may apply to 
NIST for accreditation; (3) private laboratory accreditation entities 
(bodies) may apply to NIST for approval to accredit laboratories; and 
(4) foreign laboratories accredited by their governments or by 
organizations recognized by the NIST Director under section 6(a)(1)(C) 
of the Act can be deemed to satisfy the laboratory accreditation 
requirements of the Act. The regulation also establishes, within the 
Patent and Trademark Office (PTO), a recordation system to identify the 
manufacturers or distributors of covered fasteners to ensure that the 
fasteners may be traced to their manufacturers or private label 
distributors. In addition, the regulations contain provisions on 
enforcement, civil penalties, and hearing and appeal procedures which 
are administered by the Bureau of Export Administration.
    Subpart A--``General'' sets out the purpose of the rule, and 
presents a general description of the rule. It also contains 
definitions that apply throughout the rule and establishes specific 
requirements with respect to applicable provisions of the Act.
    Subpart B--``Laboratory Accreditation'' provides that all 
laboratories that desire to engage in fastener testing covered by the 
Act and its implementing regulations must be listed by NIST in the 
``Accredited Laboratory List'' established by this subpart. NIST will 
prepare and maintain the List, which shall be composed of all 
laboratories currently accredited under subparts C, D, and E of these 
regulations. Only laboratory test reports prepared by an accredited 
laboratory currently listed in the Accredited Laboratory List shall be 
deemed to meet the requirements of the Act. Procedures for removing a 
fastener testing laboratory from listing and for appeals of listing 
decisions are also included.
    Subpart C--``NIST Fastener Laboratory Accreditation Procedures,'' 
sets out the procedures and technical requirements of the National 
Voluntary Laboratory Accreditation Program (NVLAP) Fasteners Testing 
Program. These procedures are in conformance with ISO/IEC Guide 25-
1990, ``General Requirements for the Competence of Calibration and 
Testing Laboratories.''
    Subpart D--``NIST Approval of Private Accreditation Programs'' 
governs NIST approval of accreditation programs operated by private 
entities. All private accreditation entities that seek to accredit 
fastener testing laboratories must receive recognition under this 
subpart. Revocation procedures of such approval are also covered in 
subpart D.
    Subpart E--``Recognition of Accreditation Programs,'' in accordance 
with section 6(a)(1)(C) of the Act, sets forth the conditions under 
which the accreditation of foreign laboratories by their governments or 
by organizations recognized by the Director shall be deemed to meet the 
requirements of section 7 of the Act.
    Subpart F--``Requirements for Fastener Laboratory Accreditation 
Bodies'' sets out requirements that must be met by all accreditation 
bodies approved by NIST under subpart D and recognized under subpart E. 
These requirements, based on ISO/IEC Guide 58, are intended to assure 
that the approved laboratory accreditation body has the administrative 
and technical capability to conduct a fastener accreditation program 
which meets all the requirements of the Act. Subpart F also sets out 
the requirements against which an approved accreditation body assesses 
the technical competence of an applicant's testing laboratory. These 
requirements are consistent with those contained in subpart C of the 
regulations and all technical requirements established under that 
subpart.
    Subpart G--``Enforcement'' sets forth the procedures governing the 
Commerce Department's administrative procedures for assessment of civil 
penalties and remedies.

[[Page 50539]]

    Subpart H--``Recordal of Insignia'' contains the conditions and 
procedures for manufacturers'' insignias to be recorded by the Patent 
and Trademark Office (PTO). The purpose of Section 8 of the Act is to 
ensure that fasteners may be traced. The Act effects this purpose by 
requiring manufacturers, private label distributors, and persons who 
significantly alter fasteners, as defined by the Act, to inscribe any 
fastener, required by the standards and specifications to which it was 
manufactured to bear a raised or depressed insignia identifying its 
manufacturer, private label distributor, or alterer, with insignias 
that can be used to trace the fastener to its original manufacturer, 
private label distributor, or person who significantly altered the 
fastener. However, the Act does not establish any particular 
recordation system to effect that purpose. The PTO was charged with 
establishing such a system.

Background--Part 1: Summary of the Comment Process from August 1992 
Issuance of the Draft Rule and Discussion of the Subsequent Actions 
That Lead to the Amendment of the Fastener Quality Act (Pub. L. 101-
592)

    On August 17, 1992, NIST published a proposed rule to implement the 
Fastener Quality Act in the Federal Register (57 FR 37032). In response 
to its request for public comments on the proposed regulation, NIST 
received 308 letters. An even 50 percent of the comments, 154, were 
submitted by representatives of businesses that distribute fasteners, 
and another 69 comments, or 22.4 percent, were submitted by fastener 
manufacturers. The remainder of the comments were distributed among 
representatives of trade associations: 22 comments received, or 7.1 
percent of the total; commenters who identified themselves as users of 
fasteners covered by the Act: 16 comments received, or 5.1 percent of 
the total; members of the NIST Fastener Advisory Committee: 8 comments 
received, or 2.5 percent of the total; representatives of fastener 
testing laboratories: 7 comments received, or 2.2 percent of the total; 
and 8 letters, or 2.5 percent, were from governmental officials, 
including one United States Senator, four agencies of the United States 
Government, one state government, and two foreign governments. The 
remaining 24 letters, or 8.2 percent, were from individuals or were not 
otherwise identifiable as belonging to any group.
    The subjects raised by the comments touched on a number of topics, 
including some 225 letters that supported legislative changes to the 
Fastener Quality Act that had been recommended by a NIST advisory 
committee to reduce the cost to the fastener industry of implementing 
the Act. In addition, NIST received letters on many topics directly 
involving the language of the regulation, such as the need to refine 
certain definitions, suggested changes to the procedures governing the 
NIST Fastener Laboratory Accreditation Program, suggested changes to 
sections of the regulation pertaining to the approval and recognition 
by NIST of third parties for the purpose of accrediting fastener 
testing laboratories, and other matters. Finally, NIST received a 
number of comments on the draft Regulatory Impact Analysis.
    The legislative changes recommended by the advisory committee and 
supported by the public comments included the following five changes to 
the Fastener Quality Act:
    * To permit tests of either chemical composition of fasteners to be 
carried out upon raw materials or finished fasteners. The effect of 
this proposed change would be to greatly reduce the number of tests 
needed to verify the chemical composition of fasteners, since many lots 
of fasteners are usually manufactured from one ``mill heat.''
    * To permit the sale of fasteners which, upon testing under the 
Act, are found to have ``minor'' flaws resulting in the fastener not 
conforming to the tolerances stated in the standards and specifications 
to which they were manufactured. Section 5(a) of the Act expressly 
prohibited the sale of fasteners which (1) do not conform to the 
standards and specifications to which they were manufactured, and (2) 
have not been inspected, tested and certified as provided under the 
Act. The Committee felt that many lots of fasteners that could not be 
sold under the Act as presently written could be sold, were this 
amendment enacted, thus reducing manufacturer costs.
    * To permit distributors to commingle fasteners from more than one 
lot in the same container, thus reducing warehouse costs for the 
distributors, despite the provisions of section 7(e) of the Act.
    * To require that any person who significantly alters a fastener be 
responsible for retesting that fastener, despite the provisions of 
section 7(d) of the Act. And,
    * To restrict the availability of test reports to the original 
purchaser despite the requirements of section 10 of the Act that such 
reports be made available to all subsequent purchasers.
    A Hearing before the Subcommittee on Science, Technology, and Space 
of the Committee on Commerce, Science, and Transportation, United 
States Senate, was held in July 1993 to receive testimony from NIST and 
from the fastener industry on the need for amendments to the 1990 Act. 
Amendments addressing the issues raised by NIST and the Committee were 
introduced in the 102nd Congress and were passed by the U.S. House of 
Representatives as part of the National Competitiveness Act of 1994 
(H.R. 820). The U.S. Senate passed a slightly different version of the 
same bill (S.4). However, the bills did not emerge from the House/
Senate Conference before the 102nd Congress adjourned.
    In October 1994 the Industrial Fasteners Institute (IFI), the 
National Fastener Distributors Association (NFDA), and the Fastener 
Industry Coalition (FIC) formed a bipartisan task force composed of 
nine members, nominated from the three organizations, to forge an 
industry strategy regarding amendments to the Fastener Quality Act. In 
January 1995, the Public Law Task Force (PLTF) submitted its report and 
recommendations to Senator Conrad Burns, Chairman, Subcommittee on 
Science, Technology and Space, U.S. Senate, and to Congressman Robert 
Walker, Chairman, Science Committee, U.S. House of Representatives. At 
the request of Senator Burns and Congressman Walker, the Advisory 
Committee reviewed the Task Force's report and recommendations and 
found them to be consistent with the Committee's recommendations for 
amending the Act that were transmitted to NIST and to Congress in 1993. 
The Task Force submitted recommendations to Congress for further 
simplification and clarification of the Act in early June 1995. Joint 
recommendations for amendments from the Fastener Advisory Committee and 
the Public Law Task Force were included in legislation introduced as HR 
2196 in the U.S. House of Representatives and as S.1164 in the U.S. 
Senate. A compromise version was passed in February 1996 as the 
National Technology Transfer and Advancement Act, and signed into law 
by President Clinton in March 1996 as Pub L. 104-113.

Background--Part 2: Summary of the Fastener Quality Act and Amendments 
to the Act as Part of Pub L. 104-113

    The Fastener Quality Act requires that certain fasteners sold in 
commerce conform to the specifications to which they are represented to 
be manufactured; provides for accreditation of laboratories engaged in

[[Page 50540]]

fastener testing; and requires the inspection, testing and 
certification (in accordance with standardized methods) of fasteners 
covered by the Act.
    Section 2 of the Act sets out the findings of Congress with respect 
to the Act. Section (a)(4) was deleted, and in section(b) the 
references to fasteners used in ``critical applications'' were deleted. 
These changes are consistent with the deletion of section 4 of the Act, 
assigning the Secretary of Commerce responsibility to determine 
categories of fasteners used in ``critical applications'' for purposes 
of adding or deleting them from coverage under the Act. The term ``by 
lot number'' was deleted from (a)(7) to be consistent with proposed 
changes in section 7(e), which allow distributors to voluntarily 
commingle two or more certified lots of like fasteners.
    Section 3 of the Act provides definitions of terms used in the Act 
and in the proposed rule. The following definitions were amended in the 
Act:
     Definition (1) ``alter'' was amended by deleting the 
reference to a minimum tensile strength of 150,000 pounds per square 
inch (psi). It was felt that this type of technical requirement did not 
belong in the Act and should be covered in implementing regulations. 
Accordingly, the issue is dealt with under Sec. 280.2 of this proposed 
rule.
     Definition (2) ``consensus standards organization'' was 
amended by adding the word ``consensus'' in the third line to emphasize 
the reliance upon ``consensus standards'' for fasteners covered by the 
Act.
     Definition (5) ``fastener'' was amended by deleting item 
(D) to be consistent with the deletion of section 4 which assigns the 
Secretary of Commerce responsibility to add or delete fasteners from 
coverage under the Act based upon their use in ``critical 
applications.'' In addition, fasteners produced in accordance with ASTM 
F432 are exempt from coverage under the Act. ASTM F432 covers rock and 
roof bolts and accessories used in the mining industry. This action was 
the result of a petition by the American Mining Congress that such 
products do not meet the intent of the Act and that they are strictly 
regulated by the Mine Safety and Health Administration.
     Definition (6) ``grade identification marking'' was 
amended by deleting the term ``other person'' and replacing it with 
``government agency.'' This change was necessary to be consistent with 
the revision of the definition of ``standards and specifications.''
     Definition (8) ``Institute'' was amended to correct the 
spelling of ``Standards'' in NIST' name.
     Definition (11) ``original equipment manufacturer'' was 
deleted from the Act to be consistent with the change to section 7(f) 
which deletes any reference to OEMs.
     Definition (13) ``standards and specifications'' was 
amended to resolve two major problems. First, the wording in the 
original definition was interpreted by NIST and Commerce attorneys as 
prohibiting the sale of any fastener not fully meeting the requirements 
of the standards or specifications to which it was manufactured. Such 
interpretation does not recognize long-standing industry practice of 
disposing of non-conforming fasteners in accordance with defined 
procedures contained in consensus standards. The objectionable language 
was removed from the definition. Second, the definition as now 
constructed makes it clear that for the purposes of the Act only 
fasteners which are covered by standards and specifications published 
by a consensus standards organization or by a government agency are 
subject to the Act.
     Definition (14) ``through-harden'' was amended by adding 
``* * * for the purpose of achieving a uniform hardness'' to improve 
its meaning.
    Section 4 of the Act was completely deleted. NIST, with the 
assistance of the Fastener Advisory Committee, attempted but was 
unsuccessful in establishing guidelines under which the Secretary of 
Commerce would add or exempt categories of fasteners from coverage 
under the Act. Originally, Congressional intent was that the Act would 
cover only ``high strength'' fasteners used in ``critical 
applications.'' A figure of 1% of fasteners meeting these categories 
was used throughout early Congressional discussions of the Act. 
However, upon passage of the Act and further study and interpretation 
of its requirements by the Department of Commerce, the Fastener 
Advisory Committee, and various industry groups, it became apparent 
that the Act applied to a majority of fasteners in the industry. 
Further, while it was possible to come to an agreement that a 
``critical application'' of a fastener was any application for which it 
was reasonably foreseeable that a failure of the fastener would result 
in serious personal injury or death, significant property damage, or 
significant repair costs, it was not possible to come to agreement a 
priori as to which fasteners were used in critical applications. The 
problem is that a single type or category of fasteners might be used in 
many different applications, some may be critical in terms of having 
the potential for causing death or injury if the fastener(s) fails, and 
others not. The ultimate user of the fastener determines how fasteners 
will be used, and there were many instances cited where ``low 
strength'' fasteners were being used in critical applications. Thus, 
NIST and the Fastener Advisory Committee concluded that there was no 
systematic way in which the Secretary of Commerce could add or exempt 
whole categories of fasteners from coverage under the Act, and that to 
attempt to do so could be costly in terms of potential litigation, with 
no resulting benefit to anyone. Such conclusion was based on evidence 
that there is no instance within the industry where one can make a 
clear-cut case that a particular fastener category, not currently 
covered by the Act, is always used in ``critical applications'' or vice 
versa.
    Section 5 of the Act prohibits selling (or offering for sale) any 
fastener unless it is part of a lot which: (1) Conforms to the 
standards and specifications to which the manufacturer represents it 
has been manufactured; and (2) has been inspected, tested, and 
certified as provided by the Act. An exception to this pre-sale 
requirement is provided for certain small lots. These small lots must 
be tested as soon as practicable after delivery to the purchaser. 
Section 5 also provides that fastener inspection and testing be 
performed by a laboratory accredited in accordance with procedures and 
conditions specified by the Secretary of Commerce. Sections 5(a)(1)(B) 
and 5(a)(2)(B) were amended to add reference to the new section (d) 
covering alternative procedures for chemical testing. Section 5(c)(2) 
was amended to make it clear that the laboratory report of testing must 
include a reference to the standards and specifications the 
manufacturer claims the fasteners have been manufactured to. Section 
5(c)(3) was amended to remove the examples of fastener markings and 
characteristics to be tested. The examples are incomplete and could be 
misleading. Section 5(c)(4) was amended to allow the manufacturer to 
follow section 5(d) regarding alternative procedures for testing 
chemical characteristics of fasteners. A new section 5(d) providing for 
an alternative procedure for determining the chemical characteristics 
of fasteners was added. This new section recognizes a long-standing 
industry practice of manufacturers relying on certificates from the raw 
material supplier for assuring that the chemical characteristics of a 
mill heat of material conform to specified standards. The section 
requires that testing be carried

[[Page 50541]]

out in a laboratory accredited in accordance with the Act.
    Section 6 requires the Secretary of Commerce, acting through the 
Director of NIST, to issue regulations including: (1) Procedures and 
conditions for NIST accreditation of fastener testing laboratories; (2) 
conditions (consistent to the extent practicable with requirements of 
national or international consensus documents) under which private 
entities may apply for approval to directly accredit laboratories in 
accordance with the requirements of the Act; and (3) conditions under 
which the accreditation of foreign laboratories by their governments or 
organizations recognized by the NIST Director will be deemed to satisfy 
the requirements of the Act. The Act leaves to the discretion of the 
Director the procedures NIST will use to determine the competency of 
foreign governments'' (or other organizations') laboratory 
accreditation programs. Section 6(a)(1) was amended to delete the 
reference to the Secretary's issuance of regulations within 180 days of 
enactment of the Act, because that time period is no longer relevant.
    Section 7 of the Act covers sales of fasteners subsequent to their 
manufacture and establishes requirements which manufacturers, 
importers, and private label distributors must meet in the sale of 
fasteners. It also requires that any person who significantly alters a 
fastener so that it no longer conforms to the description in the 
relevant certificate of conformance and offers such fastener for 
subsequent sale is to be treated as a manufacturer for purposes of the 
Act. Section 7 also governs the commingling of fasteners from different 
lots in the same container.
    There were several significant amendments to section 7 of the Act. 
Section 7(a) was amended to delete reference to section 4 of the Act, 
which was deleted. Section 7(a) was also amended to remove the 
responsibility from the manufacturer of domestically produced fasteners 
of supplying to the purchaser, at the time of delivery, a written 
certificate attesting that the fasteners have been manufactured 
according to applicable standards and specifications and have been 
inspected and tested by an accredited laboratory. Instead, the new 
requirement is that the manufacturer maintain on file a manufacturer's 
certificate of conformance covering fasteners and that the certificate 
be available for inspection. The requirement that the original 
laboratory report of test be maintained on file by the manufacturer 
remains unchanged. Copies of the manufacturers certificate of 
conformance and original test report for a given lot of fasteners may 
be requested by purchasers of such fasteners, under an amendment to 
section 10 of the Act. This change was made to reduce paperwork burdens 
under the Act and to reduce the possibility of fraudulent use of 
certificates of conformance or laboratory test reports. It is not the 
intent of these changes to deny access to such information to any 
person who can demonstrate a legitimate need for the information.
    Section 7(b) remains unchanged in terms of requiring delivery of 
fasteners of foreign origin to be accompanied by a manufacturer's 
certificate of conformance and an original laboratory testing report 
for each lot of imported fasteners. Exemptions to these requirements 
are provided for products manufactured within a nation which is a party 
to a congressionally-approved free trade agreement with the United 
States or for Canadian-origin products under the United States-Canada 
Automobile Pact for use as original equipment in the manufacture of 
motor vehicles. Also, importers or private label distributors may take 
delivery of imported fasteners without the original copy of the 
laboratory test report if the manufacturer provides a certificate of 
conformance indicating that the fasteners have been manufactured 
according to the requirements of the applicable standards and 
specifications and the importer or private label distributor assumes 
responsibility in writing for the inspection and testing of the 
fasteners in accordance with the Act.
    Section 7(c)(2) was amended by adding several words to improve its 
meaning. In section 7(d) the word ``certificate'' was replaced with 
``test report'' to make it clear that it is the test report and not the 
manufacturer's certificate of conformance that should be referred to in 
determining whether or not significant alterations have been made to a 
fastener. Section 7(e) on Commingling was amended to permit voluntary 
commingling of two or more tested and certified lots by fastener 
distributors. There is still a restriction on commingling of more than 
two tested and certified lots by manufacturers, importers, or private 
label distributors. Section 7(f) on subsequent purchaser was amended to 
indicate that any person who purchases fasteners for any reason has the 
right to request and receive containers of fasteners with the lot 
number from which they were taken conspicuously marked on the 
container. Section 7(g) was deleted because the Secretary of Commerce 
is provided authority to issue regulations pursuant to the Act in 
section 13.
    Section 8 prohibits offering fasteners for sale that are required 
by an applicable standard or specification to bear a raised or 
depressed insignia identifying the manufacturer or distributor unless 
the manufacturer or distributor has complied with the requirements of a 
program to be established by the Secretary of Commerce for the 
registration of such insignias to ensure that the fasteners may be 
traced to their manufacturers or private label distributors. However, 
the Act does not establish any particular recordation system to effect 
that purpose. The Patent and Trademark Office (PTO) was charged with 
establishing such a system. These requirements are proposed as subpart 
H of this rule.
    Section 9(a) of the Act authorizes the Attorney General to bring an 
action in U.S. district courts for declaratory and injunctive relief 
against persons who violate the Act or implementing regulations. 
Section 9(b) requires the Secretary of Commerce to establish ``notice 
and opportunity for hearing'' procedures for the assessment of civil 
penalties not to exceed $25,000 for each violation of the Act or 
implementing regulations, authorizes penalty recovery actions by the 
Attorney General, and authorizes the Secretary to issue subpoenas of 
witnesses or documents. A ``substantial evidence'' standard of judicial 
review is provided. Section 9(c) of the Act provides for criminal 
penalties, which are enforced by the Department of Justice. A new 
section 9(d) dealing with enforcement was added as an amendment to the 
Act at the request of the Bureau of Export Administration within the 
Department of Commerce. The Bureau of Export Administration has been 
delegated responsibility for enforcement of the Act by the Secretary of 
Commerce. This new language provides authority for agents and 
investigators from the Bureau of Export Administration to also use 
authorities conferred upon them by other laws of the U.S., subject to 
policies and procedures approved by the Attorney General to enforce 
this Act. Proposed regulations implementing section 9 are contained in 
subpart G of this rule.
    Section 10 of the Act deals with record keeping requirements. This 
section was amended to reduce from 10 years to 5 years, the period 
during which records must be kept by persons subject to the Act. In 
section 10(b) the word ``any'' has been replaced by the word ``the'' to 
limit the responsibility of manufacturers, importers, private label

[[Page 50542]]

distributors, and persons who make significant alterations under the 
Act, to supply copies of applicable laboratory testing reports or 
manufacturers' certificates only to their purchasers of fasteners. The 
intent of the change is to reduce paperwork burdens and to protect 
against fraudulent use of test reports and certificates of conformance.
    Section 13 provides authority to the Secretary of Commerce to issue 
regulations pursuant to the Act. The reference to issuance of 
regulations within 180 days of enactment of the Act was deleted because 
the time frame is no longer relevant.
    Section 14 requires the establishment of an advisory committee to 
assist in implementation of the Act. This section was deleted. The 
requirements of the section have been met by NIST.

Background--Part 3: Summary of Public Comments Received by NIST in 
Response to the 1992 Request for Public Comments, and NIST's Response 
to the Comments

    As was noted above, on August 17, 1992, NIST published a proposed 
rule to implement the Fastener Quality Act in the Federal Register (57 
FR 37032). A detailed analysis of the comments follows.

Comments Requesting NIST To Issue Another Proposed Rule

    Several commenters requested that in light of amendments made to 
the Fastener Quality Act under Pub. L. 104-113, NIST should issue 
another proposed rule for public comment. NIST asserts that this final 
rule is the logical outgrowth of the 1992 proposed rule and the public 
comment process. A majority of the public comments received on the 1992 
proposed rule suggested the need for particular amendments to the FQA. 
The suggested amendments were enacted as part of Pub. L. 104-113. This 
rule contains regulations making final the 1992 proposed rule, as well 
as regulations to implement expressly the FQA as amended pursuant to 
specific public comments received regarding the 1992 proposed rule. 
Therefore, under the Administrative Procedures Act, 5 U.S.C. 553, and 
relevant case law, see International Harvester Co. v. Ruckelshaus, 478 
F.2d 615 (D.C. CIR. 1973), South Terminal Corp. v. Environmental 
Protection Agency, 504 F.2d 646 (1st CIR. 1974), and United Steel 
Workers v. Marshall, 647 F.2d 1189 (D.C. CIR. 1980), denied, 101 S.Ct. 
3148 (1981), NIST has determined that it has the authority to issue 
this final rule without the necessity for issuing another proposed 
rule.

Comments Urging Changes to the Regulations Requiring Amendments to the 
Fastener Quality Act

    NIST received 225 letters (146 from fastener distributors, 50 from 
fastener manufacturers, 13 from trade associations, and 13 from 
fastener users or importers, and other sources) supporting 
recommendations of the Fastener Advisory Committee (the ``Committee''), 
which proposed that the following amendments be made to the Fastener 
Quality Act:
     Comment: Permit tests of the chemical composition of 
fasteners to be carried out upon raw materials, rather than upon 
finished lots of fasteners as required by the Act.
    NIST Response: This legislative change was made in Pub. L. 104-113, 
which added a new section 5(d) ``Alternative Procedure for Chemical 
Characteristics'' to the Act. New section 5(d) of the Act is 
implemented in section 280.15 of the regulations being published today.
     Comment: Permit the sale of fasteners which, upon testing 
under the Act, are found to have ``minor'' flaws resulting in the 
fastener not conforming to the tolerances stated in the standards and 
specifications to which they were manufactured. Section 5(a) of the Act 
expressly prohibits the sale of fasteners which (1) do not conform to 
the standards and specifications to which they were manufactured, and 
(2) have not been inspected, tested and certified as provided under the 
Act.
    NIST Response: This legislative change was made in Pub. L. 104-113, 
which amended the definition of ``standards and specifications'' found 
in subsection 3(13) of the Fastener Quality Act. The legislative change 
recognizes the provisions of numerous commercial and military documents 
which provide for a cost effective disposition system for nonconforming 
products when a minor nonconformance does not adversely affect the 
health and safety, performance, interchangeability, reliability, 
maintainability or effective use or operation. The changed definition, 
which will permit the sale of fasteners with minor nonconformances is 
found in Sec. 280.2 of the regulations being published today.
     Comment: Permit distributors to commingle fasteners from 
more than one lot in the same container, thus reducing warehouse costs 
for the distributors, despite the provisions of section 7(e) of the 
Act.
    NIST Response: This legislative change was made in Pub. L. 104-113, 
which amended section 7(e) of the Fastener Quality Act to permit 
commingling of no more than two lots of fasteners under specified 
circumstances. The change is implemented in Sec. 280.4 of the 
regulations being published today.
    Comment: Require that any person who significantly alters a 
fastener be responsible for retesting that fastener, despite the 
provisions of section 7(d) of the Act.
    NIST Response: No legislative changes have been made in response to 
this comment. Accordingly, no changes have been made to the regulation.
     Comment: Restrict the availability of test reports to the 
original purchaser despite the requirements of section 10 of the Act 
that such reports be made available to all subsequent purchasers.
    NIST Response: In section 10(b) of the Act, the word ``any'' has 
been replaced by the word ``the'' to limit the responsibility of 
manufacturers, importers, private label distributors, and persons who 
make significant alterations under the Act, to supply copies of 
applicable laboratory testing reports or manufacturers' certificates 
only to their purchasers of fasteners. The intent of the change is to 
reduce paperwork burdens and to protect against fraudulent use of test 
reports and certificates of conformance.

Subpart A--General

    Comments received by NIST pertaining to this subpart are addressed 
section by section. If no comments were received pertaining to a 
particular section, there is no corresponding entry in this analysis.
Section 280.2  Definitions
    As a result of changes made to subparts C and E of these 
regulations based on comments described in the relevant sections of 
this analysis, several changes have been made to definitions. A 
definition has been added for the term ``Accreditation Body,'' to refer 
to the National Voluntary Laboratory Accreditation Program, and to 
those private entities currently approved by NIST under subpart D of 
these regulations and those foreign governments or organizations 
currently recognized by NIST under subpart E of these regulations. A 
definition has also been added for ``Approved signatory'' to mean an 
individual employed by a laboratory accredited under the Act and these 
regulations who is recognized by an accreditation body as competent to 
sign accredited laboratory test reports. Finally, the definition of 
``Certificate of Accreditation'' has been expanded so that it now 
refers to a document issued by an accreditation body to a laboratory 
that has met the criteria and conditions

[[Page 50543]]

of accreditation, that, together with the assigned code number and 
scope of accreditation issued by the accreditation body, may be used as 
proof of accredited status.
    Various comments suggested that three interrelated definitions, for 
``alter,'' ``critical application,'' and ``significantly alter'' should 
be revised. These comments came from the Fastener Advisory Committee, 
four trade associations, two users, three manufacturers, and one 
foreign government. The Fastener Advisory Committee recommended that 
the definition of ``alter'' be slightly amended to make clear that 
alter pertains to electroplating of fasteners that are ``specified'' as 
having a minimum tensile strength of 150,000 psi or greater, otherwise 
the requirement could be misinterpreted to mean that electroplated 
fasteners that are ``tested'' and found to be greater than 150,000 psi 
would have been considered significantly altered even though they were 
specified with a minimum tensile strength lower than 150,000 psi.

Definition of Significantly Alter

    The Fastener Advisory Committee devoted a great deal of study to 
the term ``Significantly Alter'' through its Alteration Working Group. 
Public comments stressed the need to be clear about what is or is not a 
significant alteration; who is responsible as the alterer of the 
fastener; and what tests and markings are required. Consistent with 
language found in the Act, the Committee felt it is important to define 
a significant alteration as an action which could weaken or otherwise 
materially affect the performance or capabilities of the fastener as it 
was originally manufactured, grade or property class marked, and 
tested. Alterations not considered significant include the application 
of adhesives or sealants, locking elements, cutting off, provisions for 
lock wires, or coatings and platings of parts below a certain hardness 
level to be discussed later in this part. The practice of cutting 
threads off a finished fastener is not defined as a significant 
alteration. Similarly, the cutting of finished threaded studs, rods, 
and bars to produce individual smaller length threaded studs for resale 
is not considered a significant alteration. However, the individual 
fasteners cut from threaded studs, rods, and bars and offered for 
resale shall be individually marked with the grade or property class 
identification marking appearing on or accompanying the original 
threaded studs, rods, and bars from which the fasteners were cut. 
Commenters also asked for clarification on who is responsible as the 
alterer of a fastener. NIST and the Committee agree that the person who 
owned the fastener at the time the alterations were carried out is 
responsible for assuring adherence to the regulations. Accordingly, a 
definition of ``Alterer'' has been added to Sec. 280.2, per the 
Committee's wishes.
    With respect to questions concerning marking and testing of 
significantly altered fasteners, the significant alterer will be 
responsible for applying a registered insignia to the altered fastener 
if so required by the original standards and specifications, and for 
assigning a new lot number. A new Sec. 280.11 has been added to the 
regulations to spell out these requirements. The significant alterer 
will also be responsible for causing the altered fasteners to be 
inspected and tested as required under section 5 of the Act, unless the 
fastener is delivered to a purchaser accompanied by a written statement 
noting the original lot number and the new lot number assigned by the 
alterer, disclosing the subsequent alteration, and warning that such 
alteration may affect the dimensional or physical characteristics of 
the fastener.
    If the alteration is not a significant alteration, a new headmark 
and new lot number are not required and the only testing requirements 
which apply are those required by the specification to which the minor 
alteration was performed, such as prevailing torque or salt spray. If 
the significant alteration is only electroplating of fasteners above a 
certain hardness level or strength level, the requirement for a new 
headmark is waived, but a new lot number must be assigned and testing 
for hydrogen embrittlement must be performed in addition to those tests 
required by the plating specification.
    Based upon subsequent input from the Public Law Task Force on the 
issue of alteration and significant alteration of fasteners, the Task 
Force recommended to Congress that the definition of ``alter'' should 
be amended by deleting the reference to a minimum tensile strength of 
150,000 pounds per square inch (psi). It was felt that this type of 
technical requirement did not belong in the Act and should be covered 
in implementing regulations. Pub. L. 104-113 amended section 3(1)(B) of 
the Act to remove this requirement.
    The Public Law Task Force recommended to the Department that the 
Rockwell C Hardness Scale be used in the regulations in lieu of tensile 
strength for purposes of determining which fasteners have been 
significantly altered through electroplating. It is widely held within 
the fastener industry that the process of electroplating fasteners, 
particularly high strength fasteners, increases their susceptibility to 
hydrogen embrittlement. The intent of the Act and the regulations is to 
require that electroplating of high strength fasteners be considered a 
significant alteration, and to further require that the manufacturer or 
person responsible for the alteration assign a new lot number to the 
fasteners and test them in accordance with the plating specification. A 
specified Rockwell C value of 32 has been selected as the threshold 
hardness for determining when electroplating is a significant 
alteration of fasteners. This value has been selected for the following 
reasons: (1) It is roughly equivalent to the original threshold of 
150,000 psi contained in the 1990 Act (ASTM A370, which provides 
approximate hardness conversion numbers for nonaustenitic steels, 
indicates that Rockwell C 32 is approximately equivalent to a tensile 
strength of 146,000 psi and Rockwell C 33 is approximately equivalent 
to a tensile strength of 149,000 psi), thereby covering the same types 
and grades of fasteners; and (2) setting the threshold Rockwell C 
hardness value at 32 rather than 33 would treat Grade 8 fasteners and 
metric 10.9 fasteners (which are substantially equivalent) equally for 
purposes of determining when electroplating is a significant 
alteration.

Definition of Critical Application

    A large number of comments were received on the definition of 
``critical application.'' Some of the commenters felt that the 
definition did not offer guidance in determining what is meant by 
``significant property damage'' or ``significant repair costs.'' Other 
commenters felt that the definition should be changed to indicate that 
fasteners having minimum tensile strengths of 150,000 psi or greater 
should be considered as critical and those below 150,000 psi should be 
exempt from coverage under the Act because they are not generally used 
in critical applications. The Fastener Advisory Committee and the 
Public Law Task Force devoted much time and effort to studying this 
issue and recommended to Congress that section 4 of the Act be deleted 
in its entirety which would also mean deleting the definition of 
``critical application'' as it applies only to section 4. Section 4 of 
the Act was repealed by Pub. L. 104-113, and accordingly, the 
definition of ``critical application'' has been removed from the 
regulations being published today.
    NIST, with the assistance of the Fastener Advisory Committee, 
attempted but was unsuccessful in

[[Page 50544]]

establishing guidelines under which the Secretary of Commerce would add 
or exempt categories of fasteners from coverage under the Act under the 
now-repealed section 4 of the Act. Originally, Congressional intent was 
that the Act would cover only ``high strength'' fasteners used in 
``critical applications.'' A figure of 1% of fasteners meeting these 
categories was used throughout early Congressional discussions of the 
Act. However, upon passage of the Act and further study and 
interpretation of its requirements by the Department of Commerce, the 
Fastener Advisory Committee, and various industry groups, it became 
apparent that the Act applied to a majority of fasteners in the 
industry. Further, while it was possible to come to agreement that a 
``critical application'' of a fastener was any application for which it 
was reasonably foreseeable that a failure of the fastener would result 
in serious personal injury or death, significant property damage, or 
significant repair costs, it was not possible to come to agreement a 
priori as to which fasteners were used in critical applications. The 
problem is that a single type or category of fasteners might be used in 
many different applications, some may be critical in terms of having 
the potential for causing death or injury if the fastener(s) fails, 
others not. The ultimate user of the fastener determines how fasteners 
will be used, and there were many instances cited where ``low 
strength'' fasteners were being used in critical applications. Thus, 
NIST and the Fastener Advisory Committee concluded that there was no 
systematic way in which the Secretary of Commerce could add or exempt 
whole categories of fasteners from coverage under the Act, and that to 
attempt to do so could be costly in terms of potential litigation, with 
no resulting benefit to anyone. Such conclusion was based on evidence 
that there is no instance within the industry where one can make a 
clear-cut case that a particular fastener category, not currently 
covered by the Act, is always used in ``critical applications'' or vice 
versa.

Definition of Commingling

    The Fastener Advisory Committee felt it was important to define 
commingling because it is used in the Act. Accordingly, the regulation 
has been revised to define ``Commingling'' as meaning the mixing of 
fasteners from different lots in the same container.

Definition of Fastener--Washers Subject to the Act

    During the joint meeting of the Fastener Advisory Committee and the 
Public Law Task Force, held May 15-16, 1996 at the National Institute 
of Standards and Technology (NIST), washer manufacturers present at the 
meeting commented that there was confusion about which washers were 
``fasteners'' under the Act. In particular, they pointed to confusion 
among their customers, many of whom were interpreting the Act as 
covering any washer that was to be used with a bolt or screw that 
itself was covered by the Act.
    Congressional intent on this issue is clearly stated in page 10 of 
Senate Report 101-388, dated July 23, 1990, which accompanied the 
original H.R. 3000 (Fastener Bill). It states as follows: 
``Subparagraph (C) of section 3(5), which defines `fastener,' is 
intended to cover those washers which standards indicate are associated 
with particular fasteners and must be used in order for those fasteners 
to conform to those standards. A washer whose use with a particular 
fastener is permitted but not required is not covered by this 
definition.''
    The Advisory Committee and the Task Force concluded that there were 
only two U.S. standards and specifications which specifically call out 
requirements for washers used in association with covered fasteners 
under the Act, and that the regulations should identify such standards 
and specifications to make it clear what washers were fasteners within 
the meaning of the Act. The standards and specifications are ASTM F959 
or F959M pertaining to load indicating washers, and ASTM F436 or F436M 
which pertain to washers specified for use with structural bolts or 
equivalent high strength bolts. The Advisory Committee and the Task 
Force also pointed out that there may be foreign or international 
equivalents to these standards and specifications.
    The Department believes that the conclusion of the Advisory 
Committee and the Task Force, as stated above, is consistent with the 
stated Congressional intent of the Act, but feels that it would be 
inappropriate to include a specific determination within the 
regulations that only washers manufactured to or held out as being 
manufactured to the above-mentioned standards and specifications are 
fasteners within the meaning of the Act. To do so would unnecessarily 
restrict the freedom of consensus standards bodies to significantly 
change these standards and specifications in the future, or to propose 
new standards and specifications which would have the effect of 
including additional washers as ``fasteners'' within the meaning of the 
Act. In addition, doing so could exclude washers held out as meeting a 
foreign or international standard or specification that requires 
certain washers to be used with particular fasteners in order to 
conform to that standard or specification.

Definition of ``Fastener''--Referencing of Consensus Standards

    During the joint meeting of the Fastener Advisory Committee and the 
Public Law Task Force, held May 15-16, 1996 at the National Institute 
of Standards and Technology (NIST), comments were received from a 
member of the Advisory Committee on that part of the definition of 
``fastener'' in Sec. 280.2 of the regulations, which includes the 
requirement that: ``A screw, nut, bolt, stud, or washer held out as 
being produced according to the requirements of a document other than a 
document published by a consensus standards organization is a fastener 
within the meaning of the Act and this part if that document 
incorporates or references (directly or indirectly) standards and 
specifications published by a consensus standards organization or 
government agency for purposes of delineating performance or materials 
characteristics of the fastener.''
    In the view of this Committee member the Congressional intent was 
to amend the definition of ``standards and specifications'' in section 
3(14) of the Act to remove from coverage under the Act fasteners 
produced to standards and specifications published by ``major end-
users,'' and therefore the language proposed in Sec. 280.2 of the 
regulations as noted above was not consistent with Congressional 
intent. The Committee member proposed an amendment to the definition of 
``standards and specifications'' which would have the effect of 
exempting from coverage under the Act and regulations fasteners 
produced to standards and specifications published by ``major end-
users'' who then purchase such fasteners and install them into a 
structure or assembly. The Department agreed to study this matter and 
no action was taken on the proposal by the Advisory Committee and the 
Task Force.
    The Department has studied this issue and concludes that the 
definition of fastener as provided in Sec. 280.2 of the regulations 
meets Congressional intent. Therefore, the proposal to exempt fasteners 
produced to standards and specifications published by ``major end-
users'' is rejected. The reasons are as follows. In the 1990 version of 
the Fastener Quality Act, ``standards and specifications'' were defined 
as

[[Page 50545]]

documents published by ``consensus standards organizations,'' 
``government agencies,'' and ``major end-users.'' The Act further 
defined ``consensus standards organization'' but did not define ``major 
end-user'' of fasteners. NIST, with the assistance of the Fastener 
Advisory Committee, defined ``major end-user'' in the draft 
implementing regulations issued for public comment in 1992 as ``a 
recognized developer and publisher of standards bearing such user's 
identification which have characteristics similar to national consensus 
standards and which have been developed or modified to fit the specific 
needs of such user.''
    During the 1992 public comment period, comments were received from 
the Fastener Advisory Committee that there are manufacturers and 
private label distributors who modify existing standards and 
specifications to produce unique fasteners either for marketing 
purposes or to satisfy a particular market niche, and that such 
manufacturers or private label distributors might not be considered 
``major end-users'' for purposes of this definition. The result could 
be that fasteners produced this way might be considered ``blueprint 
specials'' and, therefore, not subject to the Act. Based upon such 
comments, the Department proposed a change to the definition of 
``standards and specifications'' to have it read: ``* * * the 
provisions of a document published by a consensus standards 
organization, a government agency, a manufacturer, a private label 
distributor, or a major end-user of fasteners.'' The net effect of the 
proposed change would have been to include a much broader population of 
fasteners under the Act. For example, fasteners produced to a company's 
proprietary standard would have been included under the Act provided 
the fastener met all other requirements pertaining to the definition of 
a ``fastener.''
    In 1995 industry formed the Public Law Task Force to forge a 
unified industry position on needed amendments to the Act. The Task 
Force was invited by Congress to propose clarifying and substantive 
amendments to the Act. NIST was asked to cooperate with the Task Force 
in developing such recommendations. The definition of ``standards and 
specifications'' was an issue raised by the Task Force, who felt that 
the definition was confusing and needed to be simplified. In reviewing 
the definition, NIST concluded that the 1992 proposed change had the 
effect of including within the meaning of the Act fasteners produced to 
standards and specifications published by manufacturers and private 
label distributors, and that such extension of the Act was not 
supportable after a review of Congressional history of the Act. 
Additionally, the definition of ``major end user'' as proposed in the 
1992 draft of the regulations was confusing in terms of deciding which 
standards of which organizations would apply.
    A review of legislative history indicates that the intent was to 
cover fasteners produced for use by original equipment manufacturers 
(OEMs) in ``aircraft, the space shuttle, motor vehicles of all kinds, 
military equipment, highway bridges, and buildings'' (page 2, Senate 
Report 101-388, dated July 23, 1990). Additional evidence is contained 
in the Act itself by virtue of the definition of OEMs contained in 
section 3(11) of the 1990 Act and in examples cited in pp 18-19, of the 
Senate Report cited above. Further, in discussions within the Task 
Force it was clear that industry practice among companies like General 
Motors, Ford, and Chrysler was to reference standards from ASTM, SAE, 
and other consensus standards bodies in their standards.
    Accordingly, the Task Force proposed an amendment to the definition 
of ``standards and specifications'' in section 3(14), which was adopted 
by Congress and which bases the Act's coverage of fasteners on those 
produced to standards and specifications of consensus standards bodies 
and government agencies. Such amendment was proposed with the 
understanding that NIST would further specify by regulation that 
fasteners produced to documents other than those of consensus standards 
organizations or government agencies would be fasteners within the 
meaning of the Act if those documents incorporate or reference 
(directly or indirectly) standards and specifications published by a 
consensus standards organization or a government agency for purposes of 
delineating performance or materials characteristics of the fastener. 
Therefore, fasteners produced to standards and specifications published 
by major end-users are covered by the Act and Regulations, if those 
standards and specifications incorporate or reference, directly or 
indirectly, standards and specifications published by a consensus 
standards organization or a government agency.

Definition of Grade or Property Class Identification Marking

    Several comments were received that the definition of ``Grade or 
Property Class Identification Marking'' should be clarified to 
distinguish between grade or property class marks and ``raw material 
marks.'' A grade mark is placed on a fastener to indicate that the 
material, strength properties, or performance capabilities of the 
fastener conform to a specific standard. A raw material mark indicates 
the base material used and is not considered a grade identification 
mark for purposes of the Act and Regulations, unless the mark is 
required by the fastener standards and specifications to identify 
specific conformance.

Definition of Lot Traceability

    The Fastener Advisory Committee recommended that ``lot 
traceability'' be defined as it is an important term used in the Act 
and regulations. A definition has been provided in the regulations. As 
part of the definition, it is necessary to make it clear that the 
fastener part number, manufacturer's identity, and lot number are 
critical elements of information needed to assure lot traceability. 
Accordingly, a definition has also been added for ``lot-specific 
identification information,'' as meaning information applicable to a 
fastener consisting of, at a minimum, (i) the part number (or a part 
description if there is no applicable part number), (ii) the identity 
of the manufacturer, and (iii) the lot number. A definition has also 
been provided for ``Lot number'' as meaning a number assigned by a 
manufacturer to the lot.

Definitions Related to ``OEMS''

    Eight commenters, five manufacturers and users of fasteners, and 
three trade associations suggested that changes should be made in the 
definitions contained in the regulations to clarify the meaning of the 
terms ``original equipment manufacturer'' (OEM) and ``authorized 
dealer.'' Some of the commenters suggested that a definition should be 
provided for the term ``authorized dealer'' in order to clarify that 
the term ``original equipment manufacturer'' is not limited to the 
automobile industry. Other commenters expressed confusion about the 
application of the regulation in the context of original equipment 
manufacturers who are also importers. Two amendments to the Act have 
taken care of this issue. First, section 7(e), commingling was amended 
to permit voluntary commingling of fasteners by distributors and the 
reference to original equipment manufacturer was removed. Second, the 
definition of ``original equipment manufacturer'' in section 3(11) was 
deleted.

[[Page 50546]]

Definition of Original Laboratory Testing Report

    During the May 1996 joint meeting of the Fastener Advisory 
Committee and the Public Law Task Force there was discussion about the 
requirement in Sec. 280.5 of the regulations that an ``original 
laboratory testing report'' was required to be maintained on file with 
the manufacturer, importer, or private label distributor. Questions 
arose as to what constituted an original test report. In order to 
clarify the intent of the regulations a definition of ``original 
laboratory testing report'' has been added which states that it is ``a 
laboratory testing report which is originally-signed by an approved 
signatory or a copy thereof, certified by the laboratory that conducted 
the test''.

Definition of Standards and Specifications

    Comments were received from the Fastener Advisory Committee 
concerning the definition of ``Standards and Specifications.'' The 
Committee noted that there are manufacturers and private label 
distributors who modify existing standards and specifications to 
produce unique fasteners either for marketing purposes or to satisfy a 
particular market niche, and that such manufacturers or private label 
distributors might not be considered ``major end-users'' for purposes 
of this definition. The definition of ``standards and specifications'' 
has been amended in the Act to make it clear that for purposes of the 
Act only fasteners covered by standards and specifications published by 
a consensus standards organization or by a government agency are 
subject to the Act.

Definition of Traceability

    Four commenters, three manufacturers and one trade association, 
suggested that the term ``traceability'' should be revised to 
distinguish between traceability of fasteners and traceability as 
defined in the context of the standards arena. In response to this 
comment, the definition of ``traceability'' contained in the draft 
regulations has been replaced by two definitions. The first, ``Lot 
traceability,'' defines traceability in the context of fasteners as 
meaning the recording and maintenance of lot-specific identification 
information sufficient to trace fasteners from a single lot throughout 
(i) the manufacturer's fabrication or alteration process, (ii) all 
inspection and testing operations, and (iii) the subsequent chain of 
distribution in commerce. The second, ``Traceability of Measurements,'' 
defines measurement traceability as meaning a documented chain of 
comparisons connecting the accuracy of a measuring instrument to other 
measuring instruments of higher accuracy and, ultimately, to a primary 
standard.
    In response to a series of comments on laboratory test reports 
which are described below in the narrative relevant to that section, a 
definition of ``Tamper-resistant system'' has been added to Sec. 280.2. 
The phrase is defined to mean the use of special paper, embossing 
stamps, or other controls which discourage, prevent, or minimize 
alteration of test reports subsequent to manufacturing, inspection, and 
testing.
Old Sec. 280.4: Waiver Requirement and Old Sec. 280.5: Inclusion of New 
Fasteners
    Pub. L. 104-113 repealed section 4 of the Act, rendering these 
sections obsolete. Accordingly, they have been removed from the 
regulation being published today.
New Sec. 280.4: Commingling
    Pub. L. 104-113 amended section 7(e) of the Fastener Quality Act to 
permit voluntary commingling of no more than two tested and certified 
lots by fastener distributors. There is still a restriction on 
commingling of more than two tested and certified lots by 
manufacturers, importers, or private label distributors. The change is 
implemented in Sec. 280.4 of the regulations being published today.
New Sec. 280.5: Certification of Fasteners
    One commenter asked whether the regulation requires distributors to 
furnish to their customers a manufacturer's certificate when they make 
their sale. NIST notes that distributors are not required to provide 
copies of the certificates. A new Sec. 280.5 of the regulation has been 
added which specifies information that must appear in the ``certificate 
of conformance'' and the responsibility of the manufacturer to maintain 
the certificate on file available for inspection. The sale of fasteners 
by parties other than the manufacturer without an accompanying 
certification is not prohibited.
Section 280.6: Laboratory Test Reports
    A wide range of comments were received by NIST on the general topic 
of the requirements for laboratory test reports set out in Sec. 280.6 
of the regulations. For ease of analysis, those comments are discussed 
under the following general categories:
    * General Observations and Comments;
    * Authorized Signatories;
    * Tamper Proof Paper; and
    * Test Report Contents.
    Each of these topics is discussed below.

General Observations and Comments

    NIST received eight general comments on the requirements set out in 
Sec. 280.6 for the content of laboratory test reports. Four commenters 
(three manufacturers and one importer) stated that the reports were 
either burdensome, clumsy, irrelevant or otherwise unpleasant, and 
suggested that revisions be made to ``clean up'' Sec. 280.6. NIST's 
response to these comments is contained in the following paragraphs. 
Another commenter suggested that NIST require that all test reports 
include the words ``Certified Fastener Test Report'' in a clear and 
prominent position. No change to the regulation has been made based 
upon this comment. Three manufacturers and a trade association 
suggested that NIST delete the requirement to report on ``test 
conditions, test set up'' found in Sec. 280.6(a). This deletion has 
been made.
    NIST has made a number of changes to the regulation in an effort to 
simplify and clarify the required contents of laboratory test reports. 
In addition, some of the required elements of laboratory test reports 
have been grouped into logical units that NIST hopes will make the test 
reports more logical and orderly in presentation. Old Secs. 280.6(a) 
(6), (7) and (8) from the proposed regulation have been grouped under 
the category ``Sampling Information'' in a renumbered Sec. 280.6(a)(5), 
and have been assigned the numbers 280.6(a)(5) (i), (ii) and (iii). In 
addition, old Secs. 280.6(a) (9), (10), (12), (14) and (15) from the 
proposed regulation have been grouped under the category ``Test 
Results'' in a renumbered Sec. 280.6(a)(6), and have been assigned the 
numbers 280.6(a)(6) (i), (ii), (iii), (iv), (v) and (vi).

Approved Signatories

    NIST received three comments on the requirement contained in 
Sec. 280.6(a)of the regulation that all laboratory test reports be 
signed by an approved signatory. All three comments were from 
manufacturers, and suggested either that the requirement for a 
signature be removed completely, or that copies of signatures be 
permitted. No changes have been made by NIST to the regulation. An 
original test report containing an ``original signature of an approved 
signatory'' of the laboratory must be provided to the manufacturer, and 
under section 7(a)(2) of the Act the original test report must be 
maintained on file with the manufacturer and be available for 
inspection. However, copies of such report provided by the manufacturer 
on a request basis to

[[Page 50547]]

customers do not have to bear original signatures. A definition of 
``approved signatory,'' has been added to Sec. 280.2 of the regulation 
to clarify which individuals are empowered to sign test reports on 
behalf of accredited laboratories.

Tamper Proof Paper

    NIST received twelve comments pertaining to the requirement found 
in Sec. 280.6(a) that all laboratory test reports use tamper proof 
paper. Seven of the comments urged that the requirement for tamper 
proof paper be deleted; these comments came from three manufacturers, 
two trade associations and two users of fasteners.
    The remaining five comments urged that the requirement for tamper-
proof paper be replaced by a requirement for a system which discourages 
tampering, perhaps embossing, because tamper-proof paper is not 
generally available. These comments came from four manufacturers and 
one trade association. As a result of these comments, NIST has revised 
Sec. 280.6(a) of the regulations to provide for the use of a ``tamper-
resistant system'' in the preparation of laboratory test reports. In 
addition, a definition has been added to Sec. 280.2 as follows 
``Tamper-resistant system'' means the use of special paper or embossing 
stamps or other controls which discourage, prevent or minimize 
alteration of test reports subsequent to manufacturing, inspection and 
testing.

Test Report Contents

    NIST received numerous comments pertaining to the specific contents 
of laboratory test reports required by Sec. 280.6 of the regulations. 
In the following paragraphs these comments are described along with 
NIST's response to them.
    One comment from an importer stated that Sec. 280.6(a)(3) should be 
revised so that ``Name of client'' should apply only to independent 
laboratories, and not to in-house laboratories. In order to avoid 
creating confusion for parties that may review the laboratory test 
report at a later date the regulation has not been changed.
    NIST received eleven comments on the provisions of old 
Sec. 280.6(a)(5) (now Sec. 280.6(a)(4)), which pertains to the 
description of the fastener required in laboratory test reports. 
Comments from a manufacturer and an importer raised concern about the 
requirement for describing head markings found in old 
Sec. 280.6(a)(4)(iii) (now Sec. 280.6(a)(4)(iv)). One commenter 
suggested that the requirement should be deleted, and another suggested 
that the requirement was too burdensome. NIST has determined that the 
requirements of this section are essential to the report, and have 
clarified its wording that both the manufacturer's recorded insignia 
and grade markings must be reported. Three comments were received about 
old Sec. 280.6(a)(4)(iv) (now Sec. 280.6(a)(4)(v)), an importer 
observing that the requirement for a listing of thread tolerance on 
laboratory test reports was not needed because this information was 
specified by a standard; a distributor stated that the section should 
refer to ``Nominal Diameter'' instead of ``Diameter''; and an agency of 
the United States Government suggested that ``class of fit'' be 
replaced with ``dimensional tolerance class'' and add ``thread 
application category (safety critical thread, other thread etc.), or 
conformance requirements, and the dimensional standard under which the 
threads were manufactured.'' The section has been revised to refer to 
``nominal dimensions'' as suggested.
    Continuing the discussion on old Sec. 280.6(a)(5) (now 
Sec. 280.6(a)(4)), one manufacturer suggested that the section be 
revised to require inclusion in the test report of information on the 
revision level of applicable drawing or standard at the time of 
manufacture. Also, a trade association suggested that the same section 
be revised to add part numbers. No changes have been made to the 
regulation based upon these comments since NIST believes that adequate 
information on these matters is already required. Another manufacturer 
suggested that old Sec. 280.6(a)(5)(viii) (now Sec. 280.6(a)(4)(viii)) 
be revised by changing ``specification and grade of material'' to 
``grade of material.'' No change was made to the regulation based upon 
this comment. A user and a manufacturer each suggested that old 
Sec. 280.6(a)(4)(ix) be revised to eliminate ``heat treated to the 
requirements of the following specification'' and this change has been 
made. The last comment on old Sec. 280.6(a)(5)(now Sec. 280.6(a)(4)) 
was a suggestion by a user who suggested that it be revised not to 
require thickness, baking, and so on. The coating material must be 
specified, but the regulation has been changed in the now 
Sec. 280.6(a)(4)(ix) to drop any reference to thickness of coating or 
baking of fasteners.
    Three manufacturers and a trade association suggested that original 
Sec. 280.6(a)(8) (now Sec. 280.6(a)(5)(iii)) be revised to delete the 
name and affiliation of the person performing lot sampling, and two 
manufacturers, a user and an importer suggested that Sec. 280.6(a)(9) 
was redundant. NIST has determined that these elements are essential to 
the report; accordingly no changes have been made. Five comments were 
received pertaining to original Sec. 280.6(a)(10) (now 
Sec. 280.6(a)(6)(ii)) of the regulations, divided among two 
manufacturers, a user, an importer, and a trade association. The 
commenters noted that a clarification was needed of the meaning of 
``test results''; that is, whether the results should be given as pass/
fail, as maximum and minimum results, or within the context of actual 
specification limits. The ``test results'' to be recorded in the test 
report are those specified in the applicable standard, specification, 
or test method cited by the manufacturer and/or used by the laboratory. 
Hence, no change to the regulation was made based upon these comments.
    Three comments from manufacturers questioned the provisions of 
original Sec. 280.6(a)(12) (now Sec. 280.6(a)(6)(iii)) pertaining to 
reporting on all deviations from the test method, asking whether 
deviations from the test method would result in flawed testing/
erroneous test results. Two commenters, a manufacturer and an importer, 
suggested that original Sec. 280.6(a)(14) (now Sec. 280.6(a)(6)(iv)) 
should be revised by deleting ``all other items required by the test 
method'' as ambiguous or expanding the section to define that which is 
required. No cha
FR Doc. 96-24105 Procedures for Implementation of the Fastener Quality Act
nges have been made to the regulation based upon this 
comment. One manufacturer commented that the wording of original 
Sec. 280.6(a)(15) (now Sec. 280.6(a)(6)(vi)) appears to suggest 
nonconforming products can be sold.
    Two manufacturers recommended that old Sec. 280.6(a)(17) (now 
Sec. 280.6(a)(8)) be deleted, thus removing the requirement that the 
test report relate only to the item(s) tested, and two manufacturers 
suggested deleting the requirement found in Sec. 280.6(a)(18) (now 
Sec. 280.6(a)(10)) for reporting the name of the body which accredited 
the laboratory for the specific tests performed which are the subject 
of the report and the current period of accreditation. NIST has 
determined that this information is essential to the report, and the 
requirements of these two sections have not been removed.
    One user commented that current Sec. 280.6(c) should be revised to 
require numbering for supplemental reports amending previously issued 
reports. No change has been made to the regulation based upon this 
comment because the regulation already provides that supplementary 
information must be reported on a ``suitably marked'' document.

[[Page 50548]]

Section 280.7: Recordkeeping Requirements
    The Department received comments on a variety of issues raised by 
Sec. 280.7 of the regulations. A paragraph is devoted below to each of 
these issues.
    NIST received four comments, two from manufacturers and two from 
trade associations, stating that test reports should only be available 
to the original purchaser. An amendment to section 10 of the Act 
provides for this.
    NIST received ten comments suggesting that Sec. 280.7(a) be revised 
to permit electronic record storage, five from manufacturers, three 
from trade associations, one from a university professor and one from a 
consultant. This final rule provides that records may be kept in the 
form (whether paper, photographic, electronic or some other form) in 
which they are created or received by the regulated person. In 
addition, Sec. 280.7 of this final rule permits reproductions 
(including paper, photographic, magnetic, or some other form) to be 
kept in lieu of originals for all records except for test reports (for 
which the Act requires originals). However, it establishes specific 
requirements of retrievability and legibility that must be met if the 
person required to keep records elects to destroy originals and keep 
reproductions in lieu thereof. It also makes clear that the regulated 
person must make the records available to NIST or BXA upon request.
    A testing laboratory and a government agency noted that the law has 
no provisions for the protection of records should a manufacturer or 
test laboratory file bankruptcy, be dissolved, or be destroyed by fire 
and/or by an act of God. The commenters recommended that this problem 
be addressed, and that it be documented as either a waiver to the law 
or a requirement to the law as how to protect records for ten years in 
the event of a misfortune to the manufacturer and/or test facility. In 
response, NIST notes that the Act contains no provision for waiving the 
record retention requirement under any circumstance and that 1996 
amendments to the Act reduced the record retention requirement to five 
years.
    Three commenters, two manufacturers and a trade association, 
suggested that the wording in Sec. 280.7(a) requiring that the records 
be sufficiently detailed to permit duplication of the ``exact test 
conditions'' at a later date be relaxed, perhaps to simply require 
sufficient information to ``allow the test results to be verified by a 
retest if necessary.'' Section 280.7 of this final rule adopts this 
change.
Section 280.8: Ownership of Laboratories by Manufacturers
    NIST received three comments concerning Sec. 280.8 of the 
regulations, one from a user, one from a trade association, and one 
from the category ``other.'' One commenter suggested that NIST ban all 
ownership of testing laboratories by manufacturers; another commenter 
urged that NIST impose no ban on the ownership of testing laboratories 
by manufacturers; and the third stated that it was unclear what 
conditions might be imposed on accredited laboratories affiliated with 
a manufacturer.
    Section 280.8 of the regulations repeats the provisions of section 
5(b) of the Act, essentially verbatim. As written, Sec. 280.8 creates a 
procedural mechanism under which decisions may be made by the Director 
of NIST as to whether the public health and safety would be increased 
by a ban on the ownership of testing laboratories by manufacturers for 
specific types of fasteners and tests. Specifically, any ban would be 
the subject of a notice and comment process before taking effect. NIST 
believes that its discretion in proposing a particular ban intended to 
protect the public health and safety should not be limited in advance 
by regulation. Accordingly, no change has been made to this section of 
the regulations.
Section 280.9: Subcontracting of Testing
    Several commenters appeared to be confused as to whether tests 
carried out by subcontractor laboratories under the provisions of 
Sec. 280.9 of the regulations would meet the requirements of the Act. 
Some expressed confusion as to what entities qualified as 
subcontractors. One manufacturer, for example, suggested that suppliers 
and manufacturers be permitted to be subcontractors. Two other 
manufacturers expressed similar confusion. One distributor suggested 
revising Sec. 280.9(b)(2) to eliminate confusion by adding the word 
``accredited'' to references to the subcontractor.
    NIST believes the regulation is clear as written and no changes are 
made to it based upon these comments. However, in order to avoid any 
possibility of further confusion, NIST wishes to stress that any and 
all subcontracting of testing under the Fastener Quality Act must be to 
a laboratory that is accredited under the Act and these regulations. 
Any party that meets the conditions set out in this regulation may 
apply for such accreditation, regardless of their affiliation with a 
manufacturer, distributor or other entity.
    In addition to the comments described above, NIST received six 
comments, three from trade associations, two from manufacturers and one 
from a distributor, urging that the regulations be revised to delete 
the requirement found in Sec. 280.9(b)(2) for notification of the 
client before the fact that the tests will be subcontracted by the 
accredited laboratory to another laboratory. NIST does not agree with 
these comments, and takes the view that notification of the client 
before the fact is important to allow them to decide if they wish for 
all testing to be done in-house.
Section 280.10: Sampling
    NIST received six comments, from four manufacturers and two trade 
associations, suggesting that the emphasis of the regulations on final 
inspection is misplaced and that the industry practice is statistical 
process control. These commenters suggested the use of statistical 
process control rather than lot sampling in the regulation. They 
further suggested that the regulation be revised to include the use of 
ANSI/ASME B18.18.3M, and ANSI/ASME B18.18.4M, in addition to ANSI/ASME 
B18.18.2M already referenced in Sec. 280.10, for purposes of sample 
selection when the standard being used by the fastener manufacturer 
does not include a sampling plan. In addition to the above comments, 
submitted in response to the August 1992 comment period on the proposed 
regulations, the automobile industry submitted comments in August 1996 
on the same issue of statistical process control. As part of their 
comments, the automobile industry projected costs of between $140 
million and $209 million annually if its suppliers of automotive 
fasteners are required by the Act and regulations to conduct final 
inspection of finished fasteners. The costs projected by the industry 
were apparently predicated on two assumptions: (1) That the Act and 
regulations require final inspection of finished fasteners in lieu of 
in-process inspection and controls; and (2) that the Act and 
regulations require the use of ASME B.18 quality assurance standards 
for inspection and testing of fasteners in lieu of QS9000 quality 
assurance standards, which are currently in-use within the automobile 
industry. NIST has concluded that neither of these assumptions are 
valid for the following reasons. First, there is nothing in the Act or 
implementing regulations that prohibits the in-process inspection and

[[Page 50549]]

testing of a given lot of fasteners based upon quality assurance 
programs such as QS9000, so long as the requirements of sections 5 (a), 
(b), and (c) of the Act are met. That is: (1) The tests called out by 
the applicable fastener standards and specifications have been carried 
out; (2) the tests have been carried out by a laboratory accredited in 
accordance with section 6 of the Act; and (3) the data are reported on 
a test report in accordance with Sec. 280.6 of the implementing 
regulations. NIST recognizes that some product standards from the 
Society of Automotive Engineers (SAE) and from the American Society of 
Testing and Materials (ASTM) used in the automotive industry require 
final inspection of fasteners, and that under statistical control 
procedures, fastener manufacturers may control influence factors (e.g., 
temperature, pressure, etc. in heating treating operations) as a means 
of assuring that a particular physical property such as hardness is 
within the stated values of the standard rather than conduct final 
inspection. Under these circumstances, supporting data for a test that 
may be required by the SAE or ASTM standard, indicating that the 
fastener lot had been tested for hardness and providing the test 
results would not be available. Hence, the manufacturer may not be able 
to meet the requirements of sections 5 (a), (b), and (c) of the Act 
because there would be no specific evidence that a hardness test had 
been conducted if it is required by the standard. Under the Act this 
problem can be easily resolved by having the automobile industry 
request that SAE or ASTM change the affected fastener standards so that 
the manufacturer has the choice in satisfying the standard, and thus 
the Act and regulations, by either providing data that the influence 
factors affecting hardness are in control for that lot of fasteners, or 
providing data that a discreet hardness test has been conducted. The 
Act, in relying on standards and specifications from consensus 
standards organizations and from government agencies as the basis for 
technical requirements to be met by manufacturers, provides significant 
flexibility to these standards developers to determine the inspection 
and testing requirements for certification of fasteners under the Act 
and regulations. Second, as to the automobile industry's assumption 
that the Act requires the use of ASME B18 quality assurance standards, 
the Act does not mandate the use of any standard or specification. 
Under authority provided by section 5(b)(2)(B) of the Act, and at the 
request of the Fastener Advisory Committee, NIST has included 
references to ANSI/ASME B18.18.2M, B18.18.3M and B18.18.4M, for sample 
selection in the event the standard or specification used by the 
manufacturer does not provide for the size, selection, or integrity of 
the sample to be selected. NIST does not have the authority to mandate 
the use of the ANSI/ASME B18.18.2M, 3M, or 4M standards for all 
inspection and testing carried out under section 5 of the Act.
Old Section 280.11: Surplus Fasteners
    This section was deleted.
New Section 280.11: Significant Alteration of Fasteners
    With respect to questions concerning marking and testing of 
significantly altered fasteners, the significant alteror will be 
responsible for applying a registered insignia to the altered fastener 
if so required by the original standards and specifications, and for 
assigning a new lot number. A new Sec. 280.11 has been added to the 
regulations to spell out these requirements. The significant alteror 
will also be responsible for causing the altered fasteners to be 
inspected and tested as required under section 5 of the Act, unless the 
fastener is delivered to a purchaser accompanied by a written statement 
noting the original lot number and the new lot number assigned by the 
alteror, disclosing the subsequent alteration, and warning that such 
alteration may affect the dimensional or physical characteristics of 
the fastener.
    If the alteration is not a significant alteration, a new headmark 
and new lot number are not required and the only testing requirements 
which apply are those required by the specification to which the minor 
alteration was performed, such as prevailing torque or salt spray. If 
the significant alteration is only electroplating of fasteners above a 
certain hardness level or strength level, the requirement for a new 
headmark is waived, but a new lot number must be assigned and testing 
for hydrogen embrittlement must be performed in addition to those tests 
required by the plating specification. If the alteration involves 
cutting of threaded studs, rods, or bars into studs, these cut 
fasteners must be marked with the grade or property class 
identification marking appearing on the original threaded studs, rods, 
and bars.
New Section 280.12: Applicability
    Seven commenters expressed concern during the 1992 comment process 
that the requirement for the use of accredited laboratories not take 
effect until a sufficient number of foreign accreditation bodies and 
laboratories have been recognized and accredited. The commenters also 
expressed concern as to how NIST would know when the number of 
accredited laboratories is sufficient. These comments were received 
from two trade associations, two importers, one distributor, one 
representative of a foreign government, and one individual.
    Except as provided in this section, the regulation will become 
effective on November 25, 1996. However, NIST notes that section 15 of 
the Act makes the regulation applicable only to fasteners manufactured 
180 days after the regulation becomes effective, i.e., May 27, 1997 and 
also provides that the Director of NIST may delay the applicability of 
the regulations to fasteners manufactured beyond that date if at that 
time an insufficient number of laboratories have been accredited to 
perform the volume of inspection and testing required. A new 
Sec. 280.12 of the regulations has been added in order to clarify this 
point.
    NIST intends to closely monitor the accreditation of laboratories 
under these regulations, and will defer the applicability of the 
regulations should circumstances warrant.

Status of Inventory

    One commenter during the 1992 comment process asked whether 
existing inventories of fasteners will be covered when the regulations 
take effect.
    NIST notes that section 15 of the Act requires only that the 
regulations be applicable to fasteners manufactured 180 days or more 
after the regulations become effective (herein after referred to as 
implementation date). This issue of applicability of fasteners has been 
discussed several times since the 1992 comment process. In its January 
10, 1995, report and recommendations for amending the Act, the Public 
Law Task Force recommended that fasteners manufactured before the 
implementation date not be allowed to be certified as conforming 
fasteners under the Act. This recommendation was endorsed by the 
Fastener Advisory Committee in letters to Congress dated February 9, 
1995. During the joint meeting of the Fastener Advisory Committee and 
the Public Law Task Force, held May 15-16, 1996, at the National 
Institute of Standards and Technology (NIST), this issue was raised 
again. In addition, the Advisory Committee and the Task Force 
recommended that language be added to the regulations which would 
permit the use of metal manufactured before the implementation date to 
be used to manufacture fasteners after that date.

[[Page 50550]]

    In order to clarify these points, a new Sec. 280.12 has been added 
to the regulations, stating that the requirements of the Fastener 
Quality Act and these regulations shall be applicable only to fasteners 
fabricated 180 days or more after the effective date of the 
regulations. This Act and these regulations do not restrict the sale of 
fasteners manufactured prior to the implementation date. Fasteners 
manufactured prior to the implementation date may be sold in U.S. 
commerce for an indefinite period of time, provided such fasteners are 
not offered for sale or sold as being in conformance with the Act and 
these regulations. The section also specifies that metal manufactured 
prior to the implementation date may not be used to manufacture 
fasteners covered by the Act and these regulations after such date, 
unless the metal has been tested for chemistry pursuant to Sec. 280.15 
of these regulations by a laboratory accredited under the Act and these 
regulations.
    The Director of NIST may delay the applicability of the regulations 
beyond the 180-day time period upon making a determination that an 
insufficient number of laboratories have been accredited to perform the 
volume of inspection and testing required.
New Section 280.13: Imports of Fasteners and New Section 280.14: Option 
for Importers and Private Label Distributors
    One commenter questioned whether the draft regulation was 
consistent with the Act's treatment of importers. After reviewing the 
regulations, NIST has decided to add a new Sec. 280.13 of the 
regulations dealing with imports of fasteners, and also a new 
Sec. 280.14 dealing with options for importers and private label 
distributors. New Sec. 280.13 sets out the rule contained in section 
7(b) of the Act that it shall be unlawful for any person to sell to an 
importer, and for any importer to purchase any shipment of fasteners or 
fastener sets manufactured outside the United States unless such 
shipment to an importer is accompanied by a manufacturer's certificate, 
an original laboratory testing report with respect to each lot from 
which the fasteners are taken, and any other relevant lot 
identification information. It then sets out the statutory exceptions 
to the general rule, which require that delivery of fasteners to any 
importer must be accompanied by an original laboratory testing report 
shall not apply:

    (1) In the case of fasteners imported into the United States as 
products manufactured within a nation which is party to a 
congressionally approved free trade agreement with the United States 
that is in effect, provided that the Director has published in the 
Federal Register a certification that satisfactory arrangements have 
been reached by which purchasers within the United States can 
readily gain access to an original laboratory test report for such 
fasteners. Or,
    (2) In the case of fasteners imported into the United States as 
Canadian-origin products under the United States-Canada Automobile 
Pact for use as original equipment in the manufacture of motor 
vehicles.

    At the present time, no Federal Register notice is planned by NIST 
under exemption (1); accordingly, this exemption is not now available.
    New Sec. 280.14 sets out the statutory provisions of section 7(c) 
of the Act. Entitled ``Option for Importers and Private Label 
Distributors,'' Sec. 280.14 states that notwithstanding the provisions 
of Sec. 280.13, delivery of a lot, or portion of a lot, of fasteners 
may be made by a manufacturer to an importer or private label 
distributor without the required original copy of the laboratory 
testing report if the manufacturer provides to the importer or private 
label distributor a manufacturer's certificate certifying that the 
fasteners have been manufactured according to the requirements of the 
applicable standards and specifications; and the importer or private 
label distributor assumes responsibility in writing for the inspection 
and testing of such lot or portion by an accredited laboratory. The 
section also provides that the provisions of section 5(a) and sections 
7(a) and 7(b) of the Act shall apply to the importer or private label 
distributor in the same manner and extent as to a manufacturer.
New Section 280.15: Alternative Procedure for Chemical Characteristics
    Pub. L. 104-113 enacted a new subsection 5(d) of the Fastener 
Quality Act entitled ``Alternative Procedure for Chemical 
Characteristics.'' The new procedure is implemented in Sec. 280.15 of 
the regulations being published today.
New Section 280.16: Subsequent Purchaser
    This section reflects changes made to section 7(f) of the Act by 
Pub. L. 104-113.

Subpart B--Laboratory Accreditation

    NIST received no specific comments on subpart B of the regulations.

Subpart C--NIST Fastener Laboratory Accreditation Procedures

    To meet the requests of many commenters that the criteria for 
accreditation follow ISO/IEC Guide 25 ``General Requirements for the 
Competence of Calibration and Testing Laboratories,'' section 280.201 
establishes that the criteria for accrediting laboratories under the 
Act will be part 285, title 15, Code of Federal Regulations, which are 
NVLAP procedures that conform with the requirements of ISO/IEC Guide 
25. Furthermore, since ISO/IEC Guide 25 is the document used 
internationally by accreditation bodies to assess the competence of 
laboratories, the revised procedures should facilitate interpretation 
of the NVLAP criteria at the international level.
Section 280.200--Introduction
    One commenter, an agency of the United States Government, requested 
that a requirement be added stating ``Standards with similar scopes, 
but with different requirements shall not have the same: (a) Title, (b) 
standard designation number, (c) product labeling system, or (d) 
conformance requirements labeling system.'' The standards organizations 
are responsible for controlling these concerns. The regulation has not 
been changed. However, the Director of NIST will work with the 
standards organizations to resolve any problems of this nature.
    A representative for foreign manufacturers requested that 
laboratories should be allowed to perform the same kind of test to 
comply with standards from different countries. Since the Act provides 
that the manufacturer of fasteners certify that the fasteners meet the 
requirements of the standards and specifications, the regulation was 
not changed.
    A laboratory requested the addition of a ``Code of Ethics.'' Many 
specific requirements and conditions are mandated for accredited 
laboratories and no change was made to this section.
    A laboratory accreditation body asked for a clarification as to 
whether a laboratory's quality assurance program must assure a required 
degree of accuracy and precision beyond that required by standard test 
methods used. NVLAP procedures cited in Sec. 280.201 address 
measurement traceability and calibration requirements.
    A trade association requested a retest be required for foreign 
sources at the receiving end. Since this is contrary to the Act's 
treatment of foreign products this section was not changed. The trade 
association also requested that the regulation ``should include 
requirements and methods for notifying customers/users of lots with 
latent defects discovered after delivery.'' Existing mechanisms for 
notification of users of fasteners with latent defects are

[[Page 50551]]

not preempted by the requirements in this regulation. However, 
procedures cited in Sec. 280.201 do require laboratories to notify 
clients promptly, in writing, of any event, such as the identification 
of defective measuring or test equipment, that casts doubt on the 
validity of results.
New Section 280.203--Adding to or modifying the Program
    A new Sec. 280.203 was added to reflect the Act's intent that the 
program reflect the changing requirements placed upon laboratories by 
the industry. This section allows the program to be added to, modified, 
or realigned based on either a written request or a need identified by 
NIST. Subsequent sections in this subpart have been renumbered 
accordingly.
Old Section 280.203 New Section 280.204--NVLAP Program Handbook
    A domestic manufacturer, a distributor and a consultant requested 
that the handbook follow ISO/IEC Guide 25-1990. This did not require a 
change to the regulation, however, the draft handbook is compatible 
with the ISO/IEC Guide 25 and contains a general operations checklist 
which follows the ISO/IEC Guide 25 technical requirements. The NVLAP 
Handbook will supplement this Subpart.
    A consultant, an accreditation body, a foreign manufacturer and two 
foreign aerospace associations requested distribution of the NVLAP 
handbook. This did not require a change to the regulation. However, in 
preparation for the February 1993 workshop, over 600 copies of the 
draft NVLAP handbook were distributed for public comment.
    A foreign manufacturer commented that there were too many test 
methods with not enough details, and no instructions for testing core 
hardness of \1/4\'' diameter bolts. Since the standards and 
specifications determine how fasteners are to be tested, no change in 
the regulation was made to address this comment. The commenter should 
contact relevant standards organizations with specific concerns.
Old Section 280.204 New Section 280.205--Applying for Accreditation
    Additional requirements were added to this section for foreign 
laboratories. These requirements were necessary to enable NVLAP to 
assess properly foreign laboratories and establish fees to maintain 
self-sufficiency. The following language was added. Foreign 
laboratories may require:
    (1) Translation of laboratory documentation into English; and
    (2) Payment of additional traveling expenses for on-site 
assessments and proficiency testing.
Old Section 208.206 New Section 280.207--Granting and Renewing 
Accreditation

On-site Assessment Interval

    A fastener manufacturer and a college professor commented that the 
on-site assessment interval was not specified. No change to the 
regulation was made. This information is provided in the NVLAP 
handbook.

Accreditation by Discipline Rather than by Test Method

    Two laboratories suggested that accreditation be offered by 
discipline rather than by test method. No change in the regulation was 
made. The handbook explains the approach which NVLAP will use to group 
together like test methods and accredit laboratories for the entire 
group.

Accreditation Period

    Six technical societies/trade associations, 7 fastener 
manufacturers and 2 consultants requested that accreditation be changed 
from 1 year to 3 years. Comments received from an agency of the United 
States Government and 3 manufacturers requested a 2-year accreditation. 
One automotive manufacturer requested the period be extended beyond one 
year. The reference to a one-year accreditation period has been deleted 
from this section. However, the NVLAP handbook will provide for a 
three-year accreditation period. If experience proves positive, the 3-
year accreditation period will be maintained, otherwise, it will be 
reduced to a shorter period. The on-site assessment will be conducted 
on a 2-year cycle with additional monitoring visits at random or to 
address specific problems called to NVLAP's attention.
Old Section 280.207 New Section 280.214--Conditions for Accreditation
    A fastener manufacturer, an automobile manufacturer, and a 
consultant requested the accreditation period be extended beyond one 
year. The accreditation period will be the same as for all other NVLAP 
accreditation programs.
    A fastener manufacturer requested removal of the requirement that a 
laboratory demonstrate, upon request by NVLAP, that it is able to 
perform tests representative of those for which it is seeking 
accreditation. This requirement has been maintained.
    A laboratory requested a limitation to the cost of accreditation. 
No change in the regulation was made. The Act specifies that sufficient 
fees be collected to cover the cost of the accreditation process.
    A fastener company requested that a laboratory must ``be capable of 
performing all tests for which it is accredited according to the latest 
version of the test method'' and delete an allowance of up to one year 
after publication, or another time limit specified by NVLAP. No change 
was made to the regulation.
    A laboratory requested that accredited laboratories be permitted to 
add tests without additional inspections and audits. No change in the 
regulation was made. The handbook describes the process for changing a 
laboratory's scope of accreditation. Specific circumstances will 
dictate the need for an additional on-site visit.
    A fastener manufacturer requested removal of the requirement to 
keep ``records of all actions taken in response to testing 
complaints,'' because Sec. 280.6 requires 5-year retention of all 
records. No change was made to this requirement.
Old Section 280.208 New Section 280.215--Criteria for Accreditation
    Eight commenters (an agency of the United States Government, an 
automobile manufacturer, a distributor, a consultant, 2 fastener 
manufacturers, a laboratory accreditation body and a law firm 
representing foreign manufacturers) requested that the criteria for 
accreditation follow ISO/IEC Guide 25 ``General Requirements for the 
Competence of Calibration and Testing Laboratories.'' NVLAP procedures 
cited in Sec. 280.201 are in full accordance with ISO/IEC Guide 25.
    A law firm representing foreign companies suggested this section 
conform to ISO/IEC Guides 54 and 55. These ISO/IEC documents pertain to 
accreditation bodies, not laboratories. Since this section provides 
criteria for laboratories and not accreditation bodies, no changes were 
made to the regulation.
    Several comments dealt with the requirements for a laboratory 
quality manual. A fastener manufacturer suggested that old 
Sec. 280.208(a)(1)(now Sec. 280.215(c)(1)) be changed to ``the Quality 
Manual in conjunction with other approved procedures must include as 
appropriate.'' This suggestion is taken care of in the existing NVLAP 
procedures.
    A laboratory accreditation body requested deletion in old 
Sec. 280.208(a) (now Sec. 280.215(c)) of the requirements that the 
quality manual contain provisions for meeting NVLAP

[[Page 50552]]

conditions for accreditation, provisions of the Fastener Quality Act, 
and quality assurance practices for test methods. This suggestion is 
taken care of in the existing NVLAP procedures.
    A laboratory accreditation organization requested that old 
Sec. 280.208(d)'s requirement (now Sec. 280.215(h)) for a calibration 
manual be replaced with section 9 of ISO/IEC Guide 25 and 280.208(e)'s 
requirement for a test plan be replaced with section 10 of ISO/IEC 
Guide 25. This suggestion is taken care of in the existing NVLAP 
procedures.
    A trade association requested that old Sec. 280.208(b)(6)(i)'s 
statement (now Sec. 280.215(b)(2)(ii)) that staff members are not to be 
subjected to undue pressure be deleted. The existing NVLAP procedures 
which follow ISO/IEC Guide 25 contain this requirement. ISO/IEC Guide 
25 also provides that the laboratory shall have policies to ensure that 
its personnel are free from any commercial, financial and other 
pressures which might adversely affect the quality and integrity of 
their work.
    A commenter from an agency of the United States Government 
requested that old Sec. 280.208(c) (now Sec. 280.215(f)) on facilities 
and equipment be modified to add a statement that: ``Equipment shall be 
of contemporary design and capability. The equipment shall be modern 
enough to require the minimum amount of operator interpretation or 
skill in determining the difference between a pass and fail condition 
of the product being tested.'' Existing NVLAP procedures require that 
the laboratory shall be furnished with all items of equipment 
(including reference materials) required for the correct performance of 
tests.
    A college professor requested that old Sec. 280.208(c) (3)(vi)'s 
requirements (now Sec. 280.215(f)(4)) for equipment records report 
variation between working and traceable instruments, and also report 
differences due to adjustments of working instrument. Existing NVLAP 
procedures require that equipment records be maintained to include 
dates and results of calibrations and/or verifications.
    A fastener manufacturer requested that old Sec. 280.208(d)(2) (now 
Sec. 280.215(h)) be changed to ``have a Calibration Manual, or 
equivalent.'' Existing NVLAP procedures require that the quality manual 
and related documentation shall contain reference to procedures for 
calibration, verification and maintenance of equipment.
    A fastener manufacturer requested deletion of provision in old 
Sec. 280.208(e) (1) and (2) (now Sec. 280.215(h)) to allow departure 
from test methods and procedures when necessary for technical reasons. 
This change has not been accepted.
    A consultant requested removal of the requirement to retain all 
original observations, calculations and derived data. Stating that it 
``is an unnecessary burden and serves no useful purpose. The final test 
report should stand on its own. If a laboratory has demonstrated 
proficiency in its various test procedures, there is no need for the 
above requirement.'' Existing NVLAP procedures follow the ISO/IEC Guide 
25 requirements on records which requires retention of original data.
    A trade association requested old Sec. 280.208(f)(2)'s reference 
(now Sec. 280.215(j)) to a ten-year record retention requirement for 
all records pertaining to tests, inspections and certifications be 
deleted, since it is already specified. This is covered in existing 
NVLAP procedures.
    A consultant requested that old Sec. 280.208(g)(3) (now 
Sec. 280.215(j)) pertaining to retention of supplemental information 
collected by a laboratory be deleted. This language has been removed 
from the regulation.
Old Section 280.209 New Section 280.208--Denying, Suspending and 
Revoking Accreditation
    A trade association requested that a specific provision be added to 
permit users to notify NVLAP of complaints, failures, etc. Users can 
report problems with a laboratory directly to NVLAP.
    NVLAP will follow-up with the laboratory to resolve such 
complaints.
Section 280.212--Approved Signatory
    Two fastener manufacturers and a trade association requested that 
authorized reproductions of the original signature of an Approved 
Signatory be permitted. The NVLAP handbook will provide guidance in use 
of an ``authorized'' signature of an Approved Signatory.

Subpart D--NIST Approval of Private Accreditation Programs

    NIST received nine comments stating that the proposed approval 
period for accreditation bodies of one year was too short, with 
suggested periods ranging from between two to six years or indefinite. 
The commenters included four manufacturers, one distributor, one 
testing laboratory, and two trade associations, and one individual. 
NIST agrees with this recommendation and the Program Handbook on 
Private Accreditation Programs now reflects this change. Accordingly, 
approvals will now be indefinite and old Sec. 280.305 has been deleted 
since renewals are no longer required. Subsequent sections in this 
subpart have been renumbered accordingly.
    NIST received a comment from a laboratory accreditation body that 
the requirement contained in Sec. 280.301(c)(17) was not in accordance 
with language contained in ISO/IEC Guide 58 with respect to assuring 
that accreditation bodies have formal rules and structures that will 
assure that senior executives, staff, and committees are free from any 
financial and other pressures which might influence the results of the 
accreditation process. NIST has changed the language to be in 
accordance with applicable provisions of ISO/IEC Guide 58. The new 
language is contained in Secs. 280.501(b)(1)(I) and (J).
    In addition, one government agency suggested that other Federal 
government agencies should be authorized to accredit laboratories for 
the purposes of the act. NIST notes that the Act does not provide for 
that authorization.

Subpart E--Recognition of Accreditation Programs

    NIST received thirteen comments on the procedures for the 
recognition of foreign accreditation bodies for testing under the 
Fastener Quality Act. The commenters consisted of five manufacturers, 
one user, three trade associations, two testing laboratories, one 
importer and one government agency. The common thread throughout the 
comments was the concern that foreign entities recognized by NIST 
should be held to the same standards demanded of U.S. laboratories and 
accreditors, and should not be subsidized by fees paid by domestic 
organizations. The suggestion was also made that international 
recognition agreements should be published in the Federal Register for 
public comment.
    In response to these comments, revisions have been made to subpart 
E to make clear that the principle of national treatment will apply; 
that is, all parties, regardless of country of origin will satisfy the 
same requirements and pay equivalent fees. NIST has, however, 
determined that publication of proposed international recognition 
agreements for comment is neither required by law nor appropriate.

Subpart F--Requirements for Fastener Laboratory Accreditation Bodies

    NIST received seven comments, one from a manufacturer, two from 
testing laboratories, one from a government agency, one from a foreign 
government, one from a trade association and one from an individual, 
stating that the

[[Page 50553]]

procedures and criteria contained in this subpart should be based on 
the most currently available international guides. In part, the 
regulations are based on ISO/IEC guides 54 and 55 which have been 
superseded by ISO/IEC Guide 58. In response to these comments, subpart 
F has been rewritten and is now based upon ISO/IEC Guide 25 and 58.

Subpart G--Enforcement

    This final rule consolidates the provisions of the proposed rule, 
subparts G, H and I, into a subpart G. As in the proposed rule, this 
final rule defines the conduct that constitutes violations of the Act 
and the regulations. However, instead of enumerating an exclusive list 
of acts prohibited by the Act and the regulations (as in subpart G of 
the proposed rule), this final rule provides that any conduct 
prohibited by the Act and regulations would be a violation of the Act 
and the regulations. Subpart G of this final rule also sets forth 
certain specific and general actions by persons subject to the Act and 
the regulations that can give rise to a charge that a violation has 
been committed.
    As in the proposed rule, this final rule provides an administrative 
process by which a person charged with violating the Act and the 
regulations is given notice and opportunity for a hearing before a 
civil penalty may be imposed. This final rule provides that the Office 
of Export Enforcement will initiate administrative enforcement 
proceedings and the Office of Chief Counsel for Export Administration 
will represent the Department in such proceedings before an 
administrative law judge.
    In response to the publication of the proposed rule, one commenter 
pointed out possible inconsistencies between the Act and the list of 
prohibited acts set out in Sec. 280.602 of the proposed rule.
    This commenter stated that language in Sec. 280.602(a), (b), (c), 
(g), (i) & (m) of the proposed rule would prohibit conduct beyond that 
intended by the Act. Language in those paragraphs would have prohibited 
the ``introduction (into commerce), delivery for introduction (into 
commerce), transportation or causing to be transported in commerce for 
the purpose of sale or delivery'' of fasteners that did not meet the 
requirements of Sections 5 or 7 of the Act. The commenter pointed out 
that, by such language, the regulations could apply to fasteners that a 
manufacturer of an end product produced in-house and shipped to a 
contractor for fabrication into a subassembly which the contractor then 
returned to the manufacturer for incorporation into a finished end 
product.
    We agree that the Act was not intended to cover such transactions. 
Subpart A of the final rule is consistent with sections 5 and 7 of the 
Act by making it a violation to do anything prohibited by the Act and 
this final rule. (See Sec. 280.602 of the final rule.) However, this 
does not mean, that, in all instances, the ``delivery * * * 
transportation or causing to be transported in commerce for the purpose 
of sale or delivery'' would be permissible. If any of these actions 
caused, aided, abetted a violation of the Act or regulations, or 
constituted solicitation, attempt or conspiracy to violate the Act or 
regulations, such conduct would be prohibited. (See Sec. 280.602(b), 
(c) and (d) of the final rule.)
    The same commenter pointed out that the language of Sec. 280.602(i) 
of the proposed rule omitted a condition required by section 7(b) of 
the Act. Section 280.602(i) of the proposed rule excepted imports from 
countries with which the United States has a free trade agreement from 
the requirement that imports be accompanied by a laboratory test 
report. However, Sec. 280.602(i) of the proposed rule failed to include 
the following condition contained in section 7(b) of the Act, namely:

    (That) the Secretary certif[y] that satisfactory arrangements 
have been reached by which purchasers within the United States can 
readily gain access to an original laboratory test report * * *.

    Section 280.13 of the final rule has corrected this omission by 
including the following requirement in paragraph (b)(1):

    (That) the Director has published in the Federal Register a 
certification that satisfactory arrangements have been reached by 
which purchasers within the United States can readily gain access to 
an original laboratory test report for such fasteners.

    Moreover, Sec. 280.602 of the final rule prohibits conduct that 
refrains from doing anything required by the Act and regulations. 
Therefore, a failure to provide the proper certificate of conformance 
to accompany imports, as required by section 7(b) of the Act and 
Sec. 280.13 and 280.602 of the regulations, would be a violation of the 
Act and regulations.
    The same commenter noted that the proposed rule provided specific 
time-periods within which responses to discovery requests must be made. 
That commenter recommended adopting the time-periods established in the 
Federal Rules of Civil Procedure, rather than the shorter time-periods 
set forth in the proposed rule.
    This final rule generally does not establish time periods for 
responses to discovery requests; rather, this final rule encourages the 
parties to engage in voluntary discovery and provides discretion to the 
administrative law judge in setting a time-period for responses to 
discovery, if formal discovery is requested. This final rule does 
require that the service of discovery requests be made at least 20 days 
prior to the scheduled date of the hearing, unless the administrative 
law judge specifies a shorter time period. This final rule also 
provides a minimum of 10 days for responses to requests for admissions 
of fact or law, although the administrative law judge may provide 
additional time for such responses. The Department believes that the 
flexibility for dealing with discovery provided by the final rule is 
preferable to the rigid response dates set forth in the Federal Rules 
of Civil Procedure.

Old Subpart H--Civil Penalties

    This subpart has been revised and consolidated into the new subpart 
G. NIST received no specific comments on subpart H of the regulations.

Old Subpart I--Hearing and Appeals Procedures

    This subpart has been revised and consolidated into the new subpart 
G. NIST received no specific comments on subpart I of the regulations.

Old Subpart J--Recordal of Insignia

    Subpart J has been redesignated as subpart H.

New Subpart H--Recordal of Insignia

    Two manufacturers suggested that any type of permanent marking, 
rather than just a raised or depressed insignia, as required by 
Sec. 280.900, be permitted for applying the recorded insignia on the 
fastener. Section 8 of the Act applies only to fasteners which by their 
standards and specifications must bear the manufacturer's or private 
label distributor's mark as a raised or depressed insignia. In those 
cases, the Act itself requires use of a raised or depressed insignia.
    Six comments were received on Sec. 280.700(b) of the proposed 
regulation. Two of these comments were from large end users of 
fasteners, one was from a manufacturer's association, one was from a 
government agency, and two were from manufacturers. These comments 
suggested that there is a conflict between Secs. 280.700(a) and 
280.700(b). Subsection 280.700(a) states that ``any fastener which is 
required by

[[Page 50554]]

the standards and specifications which it is manufactured to bear a 
raised or depressed insignia'' must bear a raised or depressed insignia 
identifying its manufacturer. Subsection 280.700(b) states that ``The 
manufacturer's, or private label distributor's, insignia must be 
applied to * * * any fastener which is sold or offered for sale.'' Thus 
the language in Sec. 280.700(b) encompasses a broader class of 
fasteners. In response to this comment, the language in 
Sec. 280.700(a), which tracks the statutory language, was added to 
Sec. 280.700(b).
    One professional organization suggested that Sec. 280.700(c) be 
amended to state that all insignia required by the Act be readable 
without magnification. In response, inasmuch as the Act covers 
fasteners which are \1/4\ inch in diameter, the PTO felt it was 
necessary to permit markings small enough to require magnification.
    One fastener organization, one manufacturer and one distributor 
suggested that the time periods for filing the maintenance document for 
the certificate of recordal set out in Sec. 280.720(a) be harmonized 
with the period for filing the renewal of the registration. In the view 
of the Patent and Trademark Office (PTO), a regulation which ensures 
that the renewal of the certificate of recordal and the trademark 
registration occur at the same time would be unduly complex. PTO would 
need to set out three renewal periods for fastener recordals, one for 
renewals of recordals based on trademark applications, one for renewals 
based on trademark registrations, and one for alphanumeric 
designations. In addition, the PTO would need to update its recordals 
to show the registration date of applications which mature into 
registrations. Accordingly, no change has been made to the regulation 
based upon these comments.
    The members of the Fastener Advisory Committee suggested that 
Sec. 280.723(d) be amended to permit the assignment of alphanumeric 
designations. In response, the section was rewritten to permit the 
assignment of alphanumeric designations upon notification to the 
Commissioner and re-application for the alphanumeric designation. The 
inability to assign alphanumeric designation would have created serious 
problems with unusable inventory if an ongoing business was purchased. 
The requirement that the Commissioner be notified of the assignment of 
the alphanumeric designation, and that a new application be filed in 
the name of the entity which purchases rights in the alphanumeric 
designation, will ensure that the traceability requirement of section 8 
of the Act is met.
    Two manufacturers and one professional organization suggested that 
the PTO recognize the fastener markings in MIL Handbook 57, NATO or 
CAGE codes, or the fastener markings listed with ASME, DISC or IFI. In 
response, PTO notes that the suggested listings contain identical marks 
used by different manufacturers. Therefore these listings do not meet 
the traceability requirements of section 8(b) of the Act.
    One government agency suggested that recordal of fastener insignia 
be permitted only to manufacturers not to private label distributors. 
Since the Act requires recordal of insignia both for manufacturers and 
private label distributors, no change to the regulation was made based 
upon this comment.
    One manufacturer suggested that the regulations be amended to 
permit sale of nonconforming fasteners, manufactured before the Act 
becomes effective, for a period of 5-10 years, to reduce the burden of 
imprinting a raised or depressed insignia on the fastener. Section 15 
of the Act makes the provisions of the Act applicable only to fasteners 
manufactured 180 days after final regulations are issued.
    One government agency suggested that the PTO add language to its 
regulations to clarify that a manufacturer may have an unlimited number 
of insignia recorded with the PTO. Another government department 
suggested that the regulations be amended to limit the number of 
insignia any private label distributor be allowed to have. The 
regulations, as presently written, do not limit the number of recorded 
insignia or alphanumeric designations a manufacturer or private label 
distributor may have. The PTO felt that each business should make its 
own determination as to how many recorded insignias it needed. The PTO 
did not feel it had sufficient expertise to determine a limit on the 
number of recorded insignias each business should be permitted.
    One writer suggested that, when a transfer or assignment includes 
the liabilities from previously manufactured products, the regulations 
permit the assignee to use the unaltered insignia of the assignor. In 
response, PTO notes that the regulations as presently written would 
permit the assignee to use the mark of the previous manufacturer or 
private label distributor, although the assignee would need a new 
certificate of recordal.

Comments on the Regulatory Impact Analysis

    NIST received comments on a wide array of issues concerning the 
draft Regulatory Impact Analysis (RIA) prepared in 1992, including 
comments on the percentage of fasteners that might be covered by the 
law, observations on the costs of laboratory testing, recordkeeping 
costs, nonconforming product costs, distributor costs, and so on. Each 
of these topics is treated in a separate section below. Additionally, 
NIST has prepared a final Regulatory Impact Analysis/Regulatory 
Flexibility Analysis that takes into account the 1996 amendments to the 
Act. Comments received as a result of the 1992 public comment process 
on the draft implementing regulations and as a result of subsequent 
Fastener Advisory Committee meetings have been taken into account in 
the preparation of the final Regulatory Impact Analysis.
Percentage of Fasteners Covered by the Law
    All comments received on the percentage of fasteners covered by the 
law indicated that coverage would exceed the congressional estimate of 
1 percent. One United States Senator, six distributors, three 
manufacturers, and two trade associations provided estimates ranging 
from 15 to 60 percent coverage with aerospace fastener industry 
estimates at the upper end of the range. Results from the Fastener 
Industry Coalition (FIC) Survey of distributors estimated the range of 
coverage from 5 percent to 100 percent, with an average of 54 percent.
Laboratory Accreditation/Testing Costs
    Several commenters suggested that some costs of testing have been 
omitted from the analysis. Four manufacturers noted that the economic 
impact analysis did not include the purchase cost or continued 
calibration cost of spectrographs ($100,000 to $200,000 per unit) or 
other equipment needed by many manufacturers who operate their own 
laboratories. Two manufacturers indicated that the cost of not allowing 
mill heat certifications had to be increased to include increased 
inventory costs and delivery/pickup costs to the nearest accredited 
lab. One distributor and one manufacturer noted that the cost of 
providing original copies of certifications (estimated at $15 to $35 
per certificate) should be included in the analysis. One distributor 
noted that foreign manufacturers may find it impossible to provide full 
certification for small lots of unusual items rushed into the U.S. by 
air, forcing companies

[[Page 50555]]

to set up testing laboratories in the United States to certify items.
    While two manufacturers agreed with the $35 per lot estimated 
spectrochemical testing cost, three manufacturers, one distributor, and 
one academician noted that the cost impact for spectrochemical analysis 
reflected the cost of only one element. Industry practice is to provide 
5 to 13 elements in a chemical analysis to more accurately reflect the 
material composition. Cost may therefore be 5 to 13 times higher than 
estimated. One distributor, while agreeing with the $35 estimate, noted 
that with very large lots, several tests may be required. One 
manufacturer estimated that testing costs (excluding spectrochemical 
testing) would be ten times the NIST estimate. Section 5 of the Act has 
been amended to permit fastener manufacturers to use mill heat 
certifications of chemistry supplied by metal producers instead of 
testing samples of finished fasteners for chemistry. Before the 
amendment to section 5, NIST estimated that it would cost the fastener 
industry $100.6 million annually in additional costs to conduct 
chemical tests of finished fasteners assuming 25% fastener coverage 
under the Act. The Fastener Advisory Committee, through its Cost 
Effectiveness Task Group, estimated a maximum range of between $28 
million to $1.9 billion in additional annual costs, with a more 
probable range of between $100 million to $286 million. With the 
amendment to section 5 of the Act, NIST projects that the increased 
tests costs to industry under the Act will remain at the $6 million 
level as indicated in the Summary of Adjusted Industry Costs provided 
below.
    One manufacturer estimated that the number of laboratories at the 
lower bound of the RIA estimate was too low. An estimate of 298-300 
manufacturers laboratories plus an additional 152-200 independent 
laboratories for offshore production and to cover manufacturers without 
laboratories would result in the need for a minimum of 450-500 
accredited laboratories. One manufacturer noted that most modern 
processing techniques, such as Just-in-Time, KanBan, etc., heavily 
influence the lot size downward, and the number of lots may be 
understated.
Production Delay Costs
    Four distributors/manufacturers and one auto maker indicated that 
because each lot must be tested and some tests are lengthy, ``just-in-
time'' production practices will have to be altered and very costly 
lot-by-lot product storage will be required which would increase the 
basic production cycle. Under a just-in-time inventory management 
policy, assembly operations may have to shutdown pending completion of 
testing. NIST has discussed this issue with the fastener industry. It 
relates to certain types of testing such as salt spray tests where the 
amount of time to conduct the test involves days or weeks. These types 
of tests are generally not required by the standards and specifications 
to be carried out on every lot of fasteners. Moreover, NIST feels that 
prudent inventory control and efficient scheduling of tests by 
manufacturers and distributors will alleviate shutdowns in assembly 
operations.
Recordkeeping Costs
    One manufacturer indicated that the recordkeeping requirements of 
the proposed regulations may go beyond what laboratories presently 
keep. If records of each inspection, calculations made in the 
laboratory, etc., must be maintained in addition to the test 
certificate there will be a major increase in costs. The Fastener 
Advisory Committee has indicated to NIST that laboratories currently 
involved in testing fasteners keep records that are very close to those 
required by the regulations.
    One manufacturer, one distributor, and one foreign trade 
association noted that the time required for signing a test report 
should include time for report review. Estimated time ranged from 2-20 
minutes. Additional review time will be required if test reports are 
reviewed more thoroughly after the regulation is implemented.
Training/Education Costs
    Two distributors noted that increased training and supervision of 
personnel will be required to insure compliance and that training/
information on the requirements of the Act would also have to be 
provided to foreign suppliers. NIST has been working with the fastener 
industry to organize a series of public workshops both in the U.S. and 
abroad to provide training on the Act and regulations, once the 
regulations are issued. Eight such workshops have been planned, and 
most will coincide with already planned meetings and conferences within 
the fastener industry so as to minimize costs. NIST does not feel that 
the cost of training and education needed to assure compliance with the 
Act and regulations will be significant.
Imported Assemblies Containing Fasteners
    Two manufacturers and one manufacturer/distributor noted the Act 
allows foreign competitors to produce fasteners without additional 
costs imposed by the Act and put them into automotive and other 
products which are then imported by U.S. based firms as final products 
or subassemblies. This will put U.S. firms producing similar items at a 
competitive disadvantage. NIST accepts the comments that imported 
assemblies or final products containing fasteners might have a slight 
competitive advantage over U.S. assemblies or final products containing 
fasteners manufactured in compliance with the Act and regulations. 
However, NIST feels that there are many other influence factors such as 
cost of materials, labor, and currency fluctuations that could mitigate 
any competitive advantage and that it is not realistic to claim that 
the cost of fasteners alone will result in a competitive disadvantage 
to U.S. firms.
Nonconforming Product Costs
    Eleven manufacturers, four distributors, and one importer commented 
on the major economic impact of not allowing minor nonconformances that 
do not affect the form, fit or function of a fastener. While no cost 
estimates were provided, comments indicated that total manufacturing 
cost will be significantly affected and may result in shutdown of a 
substantial number of firms. ``Just-in-time'' production practices and 
worldwide parts sourcing will also be affected and could cause 
temporary plant shutdowns.
    The Fastener Advisory Committee at its meeting of December 2, 1992 
requested its Subcommittee on Cost Effectiveness to prepare a ``white 
paper'' projecting the probable economic consequence of implementing 
final regulations without amending the Act per the Committee's 
recommendations. The report focused on three issues: (1) Permitting the 
sale of fasteners tested and found to contain minor nonconformances 
from standards which do not affect form, fit, or function; (2) 
permitting the acceptance of mill heat certificates from raw material 
suppliers rather than post manufacturing testing of finished fasteners; 
and (3) permitting the commingling of like fasteners by distributors. A 
report was produced by the Subcommittee and adopted by the full 
Committee at its meeting March 3-4, 1993. On the issue of nonconforming 
product costs, the Report estimates that fastener lot rejection costs 
will range

[[Page 50556]]

from $89 million to $285 million annually unless nonconformances now 
recognized in existing standards prevail. The Report further noted that 
such rejection costs will double when parts are plated because of the 
wide swings in coating thickness present in the existing process.
    Section 3 of the Act was amended to permit the sale of fasteners 
with minor non-conformances following guidelines established in 
applicable standards and specifications. The amendment resolves the 
non-conforming fasteners issue and will eliminate the $285 million 
worst case projected costs to industry, as estimated above.
Distributor Costs
    One distributor noted that there can be no standard cost of impact 
developed that would safely apply to each and every distributor. 
Factors affecting impact include the size of the distributorship and 
whether it's mostly a bulk operation, a prepackaged operation, a 
repackaging operation or a combination of the above. Smaller 
distributors would probably be harder hit because they tend to be more 
combination operations with a lesser quantity but wider variety of 
products and with much smaller unit sales, which includes broken kegs, 
carton or package sales. Cost impact estimates provided by individual 
distributors on their operations ranged from no or minimal additional 
cost to increases of several hundred thousand dollars the first year. 
The Fastener Industry Coalition (FIC) Cost Survey indicated wide 
variations in costs likely to be incurred by specific companies. The 
survey noted that 50 percent of respondents will require additional 
warehouse space and that first year costs would range from $1,500 to 
$500,000 and average=$50,966 with subsequent annual costs ranging from 
$1,000 to $78,000 and averaging $16,604. The survey noted that 85 
percent of respondents would require additional personnel. Estimated 
cost ranged from $4,000 to $170,000 and averaged $36,444. Eighty-one 
percent of respondents would require additional computer hardware/
software. Estimated first year cost ranged from $500 to $175,000 and 
averaged $24,821. Seventy four percent would require additional 
machinery, equipment, pallet racking, shelving, or supplies. Estimated 
first year cost ranged from $500 to $150,000 and averaged $15,326. The 
FIC Survey also noted other costs including: Labels for boxes; probable 
loss of old uncertified stock or certification costs to recertify it; 
maintenance and certification of quality control equipment and purchase 
of additional equipment and quality control personnel; additional 
recordkeeping and storage requiring cabinets and personnel; reduced 
efficiency in receiving, shipping, materials handling, etc.; cost of 
providing test reports to customers; increased inventory costs; 
transportation cost to test lab; test costs; changing vendors because 
some will drop out; cost of goods that must be scrapped; loss of stock 
due to non-commingling; cost of test reports from vendor ($5-$100 per 
lot); and additional attorney fees/insurance premiums.
    Section 7(e) of the Act was amended to permit voluntary commingling 
of fasteners by distributors only. NIST estimates that approximately 
10% of distributors will continue to provide lot traceability at an 
estimated annual cost to the industry of $6.5 million instead of the 
projected $373.3 million annual cost if all distributors were required 
to maintain lot traceability for 25% of their inventory. Note that the 
$6.5 million does not necessarily represent new costs since some 
distributors had been providing this service prior to the passage of 
the Fastener Quality Act.
Reduced Competition
    Six distributors, seven manufacturers and two laboratories noted 
that compliance/accreditation costs and liability issues are likely to 
drive firms out of the market thus reducing competition. NIST's 
assessment of economic impact has shown no evidence of burdensome 
compliance/accreditation, and liability issue-related costs.
Loss of Good Will
    Five distributors and one manufacturer noted that one of the most 
important costs will be loss of customer goodwill resulting from firms 
not being able to accept customer returns and from customers having to 
purchase more product than they actually need because breaking packages 
will not be cost effective. This problem can be minimized using normal 
industry practice of inventory control. The Act does not prevent the 
current practice of return of unused, unbroken boxes of fasteners.
Lack of Enforcement
    Three distributors, three manufacturers, and one trade association 
indicated that those producing/distributing poor quality fasteners will 
continue to do so to the extent that lack of enforcement makes that 
risk attractive. Several noted that there were already laws in effect 
to deal with the mismarked or counterfeit fasteners, but that they were 
not being sufficiently enforced. The Bureau of Export Administration 
(BXA) of the Commerce Department has 140 experienced field 
investigators who will actively enforce this Act.

Miscellaneous Comments

    One distributor noted that the regulatory impact is a non-issue 
since costs of product failures are so large. Primarily, this Act 
addresses the issue of improving the quality and traceability of 
fasteners, thereby decreasing fastener-related failures.
    One manufacturer stated that if commingling is allowed what is to 
stop someone from mixing good certified product with bogus, uncertified 
product in the same container? The Act specifically addresses who can 
commingle fasteners and how to label commingled fasteners. See subpart 
A, Sec. 280.4 of the regulations.
    One distributor noted that if a manufacturer can create bogus 
fasteners, creating bogus test reports will not be a problem either. 
The Act imposes severe criminal penalties for creating either bogus 
fasteners or bogus test reports. See Subpart G, Sec. 280.603 of the 
regulations.
    One manufacturer noted that expected potential benefit resulting 
from decreased buyer inspection and testing cost is not anticipated in 
the aerospace industry. The Act is not intended to change the current 
practice of buyer inspection and testing in the aerospace industry.

Classification

Administrative Procedure Act

    This final rule is the logical outgrowth of the proposed rule and 
the public comment process. A majority of the public comment received 
on the 1992 proposed rule suggested the need for particular amendments 
to the FQA. The suggested amendments were enacted as part of Pub.L. 
104-113. This rule contains regulations making final the 1992 proposed 
rule, as well as regulations to implement expressly the FQA as amended 
pursuant to specific public comment received regarding the 1992 
proposed rule.

Executive Order 12866

    This rule has been determined to be significant under section 3(f) 
of Executive Order 12866. However, it has been determined that this 
rule is not an economically significant rule within the meaning of 
section 3(f)(1) of Executive Order 12866, or a major rule as defined by 
section 804 of Pub.L. 104-121, based upon the adjusted costs to 
industry of

[[Page 50557]]

complying with the Fastener Quality Act as amended by Pub.L. 104-113 
(Technology Transfer and Advancement Act of 1995). The projected $18.9 
million annual costs to industry summarized below are based upon NIST's 
estimate that 25% of currently produced fasteners would be covered 
under the Act. Assuming that 55% of currently produced fasteners would 
be covered under the Act, as is projected in industry studies, the 
estimated annual industry costs adjusted by amendments to the Act would 
be approximately $38.7 million. NIST has prepared a final Regulatory 
Impact Analysis on the expected costs that will be incurred by both 
government and industry to implement these regulations, as well as on 
the expected benefits to be derived from the rule's implementation. 
NIST has transmitted this Analysis to the Office of Management and 
Budget.

Summary of Adjusted Industry Costs

    The following table summarizes the annual costs to industry for 
complying with the Fastener Quality Act, as originally estimated in the 
1993 NIST Impact Analysis, and as adjusted based upon the recent 
amendments to the Act that were contained in Pub.L. 104-113 (Technology 
Transfer and Advancement Act of 1995).

                        Estimated Industry Costs                        
                              [In millions]                             
------------------------------------------------------------------------
                                                               Adjusted 
                                                    With no       by    
                    Activity                      amendments  amendments
                                                    to act      to act  
------------------------------------------------------------------------
Lab Accreditation Costs.........................       $6.4        $6.4 
Increased Test Costs............................        6.0         6.0 
Nonconforming Fastener Costs*...................        N/A         0.0 
Spectrochemical Test Costs......................      100.6         0.0 
Distributor Costs...............................      373.7      ** 6.5 
                                                 -----------------------
    Total Annual Industry Cost..................      486.7       18.9  
------------------------------------------------------------------------
* NIST was not able to estimate these costs. However, a task force of   
  the Fastener Advisory Committee estimated lot rejection costs based   
  upon not being able to sell fasteners with minor nonconformances as   
  permitted by standards and specifications at $285 million annually,   
  worst case.                                                           
** The $6.5 million does not necessarily represent all new costs since  
  some distributors had been providing this service prior to the passage
  of the Fastener Quality Act.                                          

Summary of Benefits of the Regulation

    The economic costs associated with faulty or substandard fasteners 
entering the marketplace are difficult to measure. In the legislative 
history of the Act, numerous examples were cited of faulty or 
substandard fasteners. The one example that was quantified--the NASA 
space shuttle equipment example--included an estimated $11 million 
price tag associated with the discovery and removal of substandard 
fasteners. It is also clear from the other examples included in the 
legislative history, that many (if not most) of them resulted in 
economic losses well into the millions of dollars--losses that will be 
substantially reduced through implementation of this Act. In addition 
to economic losses, the injuries and deaths associated with product 
failures resulting from the use of faulty or counterfeit fasteners will 
be reduced. Another benefit will be a potential reduction in the 
inspection and testing costs incurred by purchasers associated with the 
quality control of incoming critical fastener procurements. Similarly, 
another benefit, although not quantifiable, is associated with customer 
perception of improved product quality for U.S. made fasteners 
resulting from the Act. Because the Act applies equally to all 
enterprises in the United States, be they domestic or foreign, 
implementation of the Act will also help to ``level the playing field'' 
in domestic sales by making it more difficult for unethical 
manufacturers and distributors to substitute substandard or counterfeit 
fasteners at ``reduced prices'' thereby being able to undercut the 
prices of their competitors. Finally, the Act uses voluntary standards 
developed by the private sector to set appropriate fastener 
specifications and test methods. This approach, which complies with the 
requirements of the Technology Transfer and Advancement Act of 1995, 
reduces the degree of regulatory involvement in and control over the 
marketplace and leaves the determination of fastener requirements to 
those most familiar with fastener technology and use.

Regulatory Flexibility Act

    The Department has conducted a final Regulatory Flexibility 
Analysis for this final rule. Laboratories, most of which are small 
entities, desiring to test fasteners in accordance with the provisions 
of the Act will incur costs related to accreditation and recordkeeping. 
These costs have been discussed in Section IV of the Regulatory Impact 
Analysis under LABORATORY COSTS. Based on estimates provided by the 
Fastener Advisory Committee, between 328 and 457 laboratories will 
require accreditation to implement Pub. L. 101-592, as amended. Using 
the 1 to 25 percent range, between 26 and 639 laboratories will require 
accreditation. Accreditation cost per laboratory will vary with the 
scope of accreditation sought (the number of test methods for which the 
laboratory seeks accreditation); however, the annual accreditation cost 
(based on NVLAP's experience) is expected to average $10,000 per 
laboratory.
    Manufacturers who sell grade-marked fasteners covered by the Act 
will incur additional testing and recordkeeping costs. Most of the 
approximately 350 U.S. fastener manufacturers are not small entities. 
No data is available on how many (if any) small U.S. fastener 
manufacturers produce fasteners covered by the Act. Manufacturer costs 
for all manufacturers are discussed in Section IV of the Regulatory 
Impact Analysis under MANUFACTURER COSTS and in the June 1996 update to 
the Analysis.
    Distributors that sell grade-marked fasteners covered by the Act 
will also incur additional costs in supplying lot traceable fasteners 
to those purchasers who request them. These costs are discussed in the 
June 1996 update to the original 1993 Regulatory Impact Analysis.
    As noted above, to the extent that the Act permitted some 
flexibility in the development of the implementing regulations, the 
Department has sought and incorporated advice from its Fastener 
Advisory Committee, chartered pursuant to the Act, to maximize the cost 
effectiveness of the regulations.
    Responses to comments are contained elsewhere in this rule and this 
is thought to minimize the significant impact of this rulemaking 
through enactment of amendments to the Act, as described above.

Paperwork Reduction Act

    This rule contains three information collection requirements 
subject to the Paperwork Reduction Act. Two collections of information 
have been approved by the Office of Management and Budget under Control 
Numbers 0693-0003, and 0693-0015. The public reporting burden for 
collecting information dealing with th
FR Doc. 96-24105 Procedures for Implementation of the Fastener Quality Act
e accreditation of fastener 
testing laboratories (0651-0003) is estimated to average 1 hour per 
response, and an estimated total annual burden of 2400 hours. The 
public reporting burden for collecting information dealing with 
approving laboratory accreditation bodies (0651-0015) is estimated to 
average 4 hours per response, with an estimated total annual burden of 
20 hours.

[[Page 50558]]

    The final rule contains one information collection provision that 
is subject to review by the Office of Management and Budget (OMB) under 
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520). The title, 
description, and respondent description of the information collection 
requirements are shown below with the estimate of the annual reporting 
and recordkeeping burden. Included in the estimate is the time for 
reviewing instruction, searching existing data sources, gathering and 
maintaining the data needed, and completing and reviewing the 
collection of information.
    Title: Fastener Quality Act Insignia Recordal Process.
    Description: This collection of information is required by section 
8 of the Fastener Quality Act. Under section 8, each manufacturer or 
private label distributor must apply to PTO for recordal of an insignia 
on the Fastener Insignia Register. The PTO has drafted a suggested 
application form for use by the public.
    Description of Respondents: Fastener manufacturers and private 
label distributors.
    Estimate of Annual Reporting and Recordkeeping Burden: The 
estimated total annual burden of hours is calculated at 100 hours. PTO 
estimates that there will be between 300 and 900 respondents, or an 
average of 600 respondents per year. The Office estimates that it will 
take the applicant 10 minutes to collect the data and complete the 
application/renewal form.
    Notwithstanding any other provisions of law, no person is required 
to respond to nor shall a person be subject to a penalty for failure to 
comply with a collection of information subject to the requirements of 
the Paperwork Reduction Act unless that collection of information 
displays a currently valid OMB Control Number.

List of Subjects in 15 CFR Part 280

    Business and industry, Fastener industry, Imports.

    Dated: September 13, 1996.
Samuel Kramer,
Associate Director.
    For reasons set forth in the preamble, title 15 of the Code of 
Federal Regulations is amended by adding part 280 to read as follows:

PART 280--FASTENER QUALITY

Subpart A--General

Sec.
280.1  Purpose/description of rule.
280.2  Definitions.
280.3  Relationship to State laws.
280.4  Commingling of fasteners.
280.5  Certification of fasteners.
280.6  Laboratory test reports.
280.7  Recordkeeping requirements.
280.8  Ownership of laboratories by manufacturers.
280.9  Subcontracting of testing.
280.10  Sampling.
280.11  Significant alterations of fasteners.
280.12  Applicability.
280.13  Imports of fasteners.
280.14  Option for importers and private label distributors.
280.15  Alternative procedure for chemical characteristics.
280.16  Subsequent purchaser.

Subpart B--Laboratory Accreditation

280.100  Introduction.
280.101  Accredited laboratory list.
280.102  Procedures for inclusion in the accredited laboratory list.
280.103  Removal from the accredited laboratory list.

Subpart C--NIST Fastener Laboratory Accreditation Procedures

280.200  Introduction.
280.201  Applicability of part 285, title 15, Code of Federal 
Regulations.
280.202  Establishment of the program.
280.203  Adding to or modifying the program.
280.204  NVLAP Program Handbook.
280.205  Applying for accreditation.
280.206  Assessing and evaluating a laboratory.
280.207  Granting and renewing accreditation.
280.208  Denying, suspending and revoking accreditation.
280.209  Voluntary termination of accreditation.
280.210  Change in status of laboratory.
280.211  Authorized representative.
280.212  Approved signatory.
280.213  Application of accreditation conditions and criteria.
280.214  Conditions for accreditation.
280.215  Criteria for accreditation.

Subpart D--NIST Approval of Private Accreditation Programs

280.300  Introduction.
280.301  Application.
280.302  Review and decision process.
280.303  Criteria for approval.
280.304  Maintaining approved status.
280.305  Voluntary termination of approval.
280.306  Involuntary termination of approval by NIST.

Subpart E--Recognition of Foreign Laboratories

280.400  Introduction.
280.401  Recognition of foreign laboratories.
Subpart F--Requirements for Fastener Laboratory Accreditation Bodies
280.500  Introduction.
280.501  Accreditation body.
280.502  Laboratory assessors.
280.503  Accreditation process.
280.504  Relationship between approved/recognized accreditation body 
and laboratory.

Subpart G--Enforcement

280.600  Scope.
280.601  Definitions used in this subpart.
280.602  Violations.
280.603  Penalties, remedies and sanctions.
280.604  Administrative enforcement proceedings.
280.605  Institution of administrative enforcement proceedings.
280.606  Representation.
280.607  Filing and service of papers other than charging letter.
280.608  Answer and demand for hearing.
280.609  Default.
280.610  Summary decision.
280.611  Discovery.
280.612  Subpoenas.
280.613  Matter protected against disclosure.
280.614  Prehearing conference.
280.615  Hearings.
280.616  Interlocutory review of rulings.
280.617  Proceeding without a hearing.
280.618  Procedural stipulations; extension of time.
280.619  Decision of the administrative law judge.
280.620  Settlement.
280.621  Reopening.
280.622  Record for decision and availability of documents.
280.623  Appeals.

Subpart H--Recordal of Insignia

280.700  Recorded insignia required prior to offer for sale.

The Written Application

280.710  Applications for insignia.
280.711  Review of the application.
280.712  Certificate of recordal.
280.713  Recordal of additional insignia.

Post-recordal Mainenance

280.720  Maintenance of the certificate of recordal.
280.721  Notification of changes of address.
280.722  Transfer or amendment of the certificate of recordal.
280.723  Transfer or assignment of trademark registration or 
recorded insignia.
280.724  Change in status of trademark registration or amendment of 
the trademark.
280.725  Cumulative listing of recordal information.
280.726  Records and files of the Patent and Trademark Office.

    Authority: Sec. 13 of the Fastener Quality Act (Pub.L. 101-592, 
as amended by Pub. L. 104-113).

Subpart A--General

Sec. 280.1  Purpose/description of rule.

    The Fastener Quality Act (the Act) (Pub.L. 101-592, as amended by 
Pub. L. 104-113) is intended to protect the public safety, to deter the 
introduction of nonconforming fasteners into commerce, to improve the 
ability to trace fasteners covered by the Act, and generate greater 
assurance that fasteners meet stated specifications. The Act:
    (a) Requires that certain fasteners which are sold in commerce 
conform to the specifications to which they are represented to be 
manufactured,

[[Page 50559]]

    (b) Provides for accreditation of laboratories engaged in fastener 
testing; and
    (c) Requires inspection, testing and certification, in accordance 
with standardized methods, of fasteners covered by the Act.

Sec. 280.2  Definitions.

    Unless the context requires otherwise or unless specifically stated 
the terms in this part have the meanings prescribed in the statute. In 
addition the following definitions apply.
    Accreditation means laboratory accreditation.
    Accreditation Body refers to the National Voluntary Laboratory 
Accreditation Program and those private entities currently approved by 
NIST under subpart D of this part and those foreign governments or 
organizations currently recognized by NIST under subpart E of this 
part.
    Accreditation criteria means a set of requirements used by an 
accreditation body which a laboratory must meet to be accredited.
    The Act means the Fastener Quality Act (Pub.L. 101-592, as amended 
by Pub.L. 104-113).
    Alter means to alter by through hardening; by electroplating of 
fasteners; or by machining.
    Alteror means a person who owns a fastener and causes it to be 
altered.
    Approved signatory is an individual employed by a laboratory 
accredited under the Act and these regulations who is recognized by an 
accreditation body as competent to sign accredited laboratory test 
reports.
    Bureau of Export Administration or (BXA) means the Bureau of Export 
Administration of the United States Department of Commerce, including 
the Office of Export Enforcement.
    Certificate of Accreditation is a document issued by an 
accreditation body to a laboratory that has met the criteria and 
conditions of accreditation. The certificate, together with the 
assigned code number, and scope of accreditation issued by the 
accreditation body may be used as proof of accredited status.
    Commingling means the mixing of fasteners from different lots in 
the same container.
    Commissioner means the Commissioner of Patents and Trademarks.
    Consensus standards organization means the American Society for 
Testing and Materials (ASTM), American National Standards Institute 
(ANSI), American Society of Mechanical Engineers (ASME), Society of 
Automotive Engineers (SAE), or any other consensus standards setting 
organization (domestic or foreign) determined by the Secretary to have 
comparable knowledge, expertise, and concern for the health and safety 
in the field for which such organization purports to set standards.
    Container means any package of fasteners traded in commerce.
    Date of manufacture means that date upon which the initial 
conversion of material into a fastener takes place.
    Director means the Director of the National Institute of Standards 
and Technology (NIST).
    Fastener means any screw, nut, bolt or stud, washer or other item 
included within the definition for fastener contained in section 3(5) 
of the Fastener Quality Act. The term ``fastener'' does not include a 
screw, nut, bolt, or stud:
    (1) That is produced and marked as ASTM A307 Grade A;
    (2) That is produced in accordance with ASTM F432; or
    (3) That is held out as being produced to other than the provisions 
of standards and specifications published by a consensus standards 
organization, or a government agency.
    A screw, nut, bolt, stud or washer held out as being produced 
according to requirements of a document other than a document published 
by a consensus standards organization is a fastener within the meaning 
of the Act and this part if that document incorporates or references 
(directly or indirectly) standards and specifications published by a 
consensus standards organization or government agency for purposes of 
delineating performance or materials characteristics of the fastener.
    Fastener insignia register means the register established at the 
U.S. Patent and Trademark Office for the recordal of fastener insignia 
to identify the manufacturer or private label distributor.
    Fastener set means a collection of small quantities of products, 
including fasteners, of varying sizes, collected together and sold as a 
package.
    Grade or property class identification marking means any symbol 
appearing on a fastener purporting to indicate that the fastener's base 
material, strength properties, or performance capabilities conform to a 
specific standard of a consensus standards organization or government 
agency. A raw material mark is not considered as a grade identification 
mark for purposes of these regulations unless this mark is required by 
the fastener standards and specifications to identify specific 
conformance.
    Importer means a person located within the United States who 
contracts for the initial purchase of fasteners manufactured outside 
the United States for resale or such person's use within the United 
States.
    Laboratory accreditation is the formal recognition that a testing 
laboratory is competent to carry out specific test(s) or specific 
type(s) of tests.
    Laboratory accreditation body means a legal or administrative 
entity that accredits laboratories.
    Laboratory assessment means the on-site examination of a testing 
laboratory to evaluate its compliance with specified criteria.
    Laboratory test report means a report prepared by an accredited 
laboratory in accord with Sec. 280.6.
    Lot means a quantity of fasteners of one part number fabricated by 
the same production process from the same coil or heat number of metal 
as provided by the metal manufacturer and submitted for inspection and 
testing at one time.
    Lot number means a number assigned by a manufacturer to the lot.
    Lot-specific identification information means information 
applicable to a fastener consisting of, at a minimum:
    (1) The part number (or a part description if there is no 
applicable part number),
    (2) The identity of the manufacturer, and
    (3) The lot number.
    Lot traceability means the recording and maintenance of lot-
specific identification information sufficient to trace fasteners from 
a single lot throughout:
    (1) The manufacturer's fabrication or alteration process,
    (2) All inspection and testing operations, and
    (3) The subsequent chain of distribution in commerce.
    Manufacturer means a person who fabricates fasteners, who 
significantly alters fasteners, or who alters any item so that it 
becomes a fastener.
    NIST means the National Institute of Standards and Technology, U.S. 
Department of Commerce.
    NVLAP means the National Voluntary Laboratory Accreditation Program 
operated by the National Institute of Standards and Technology.
    Original laboratory testing report means a laboratory testing 
report which is originally signed by an approved signatory or is a copy 
thereof, certified by the laboratory that conducted the test.
    Person means any individual, partnership, limited partnership or 
corporate entity and/or a representative, agent or designee.
    Private label distributor means a person who contracts with a

[[Page 50560]]

manufacturer for the fabrication of fasteners bearing the distributor's 
distinguishing insignia.
    Product includes any type or category of manufactured goods, 
constructions, installations, or natural or processed materials.
    Proficiency testing means the determination of laboratory testing 
performance by means of comparing and evaluating tests on the same or 
similar items or materials in accordance with predetermined conditions.
    Scope of Accreditation is a document issued by an accreditation 
body to an accredited laboratory which lists the test methods, 
standards or specifications for which the laboratory is accredited.
    Secretary means the Secretary of Commerce.
    Significantly Alter means to alter in a manner which could weaken 
or otherwise materially affect the performance or capabilities of the 
fastener as it was originally manufactured, grade or property class 
marked, tested, or represented. The term does not include the 
application of adhesives or sealants, locking elements, provisions for 
lock wires, coatings and platings of parts having a specified Rockwell 
C hardness of less than 32, or cutting off of fasteners. The cutting of 
finished threaded rods, bars or studs to produce individual smaller 
length threaded studs for resale is not a significant alteration. 
However, cut threaded studs, rods, and bars offered for sale shall be 
individually marked with the grade or property class identification 
marking appearing on or accompanying the original threaded studs, rods, 
and bars from which the fasteners were cut.
    Standards and specifications means the provisions of a document 
published by a consensus standards organization, or a government 
agency.
    Tamper-resistant system means the use of special paper or embossing 
stamps or other controls which discourage, prevent or minimize 
alteration of test reports subsequent to manufacturing, inspection and 
testing.
    Testing laboratory is a laboratory which measures, examines, tests, 
calibrates or otherwise determines the characteristics or performance 
of products.
    Through-harden means heating above the transformation temperature 
followed by quenching and tempering for the purpose of achieving a 
uniform hardness.
    Traceability of Measurements means a documented chain of 
comparisons connecting the accuracy of a measuring instrument to other 
measuring instruments of higher accuracy and, ultimately, to a primary 
standard.

Sec. 280.3  Relationship to State laws.

    Nothing in the Act or these regulations shall be construed to 
preempt any rights or causes of action that any buyer may have with 
respect to any seller of fasteners under the law of any State, except 
to the extent that the provisions of the Act or these regulations are 
in conflict with such State law.

Sec. 280.4  Commingling of fasteners.

    (a) No manufacturer, importer, or private label distributor may 
commingle fasteners of the same type, grade, and dimension from 
different lots in the same container; except that such manufacturer, 
importer, or private label distributor may commingle fasteners of the 
same type, grade, and dimension from not more than two tested and 
certified lots in the same container during repackaging and plating 
operations: Provided, that any container which contains the fasteners 
from two lots shall be conspicuously marked with the lot identification 
numbers of both lots.
    (b) Fastener distributors, and persons who purchase fasteners for 
sale at wholesale or retail, may commingle fasteners of the same type, 
grade, and dimension from different lots in the same container.

Sec. 280.5  Certification of fasteners.

    (a) No fastener shall be offered for sale or sold in commerce 
unless it is part of a lot which has been inspected, tested, and 
certified in accordance with Section 5 of the Act and this part, and 
found to conform to the standards and specifications to which the 
manufacturer represents it has been manufactured.
    (b) (1) the requirements of paragraph (a) of this section shall not 
apply to fasteners which are part of a lot of 50 fasteners or less if 
within 10 working days after delivery of such fasteners, or as soon as 
practicable thereafter--
    (i) Inspection, testing, and certification as provided in 
subsections 5 (b), (c), and (d) of the Act and this part is carried 
out; and
    (ii) Written notice detailing the results of such inspection, 
testing, and certification is sent:
    (A) To all purchasers of such fasteners, except retail sellers and 
retail consumers, and
    (B) To any retail seller or retail consumer who, prior to delivery, 
requests such written notice.
    (2) If a fastener is sold under paragraph (b) of this section, each 
purchaser of such fastener, except for retail sellers and retail 
consumers unless such retail sellers and retail consumers request such 
notice in advance, shall be provided, contemporaneously with each sale 
and delivery, written notice stating that such fastener has not yet 
been inspected, tested, and certified as required by the Act and this 
part.
    (c) Each manufacturer, importer, private label distributor, or 
alteror who significantly alters any fastener shall keep on file and 
make available for inspection in accordance with the recordkeeping 
requirements of Sec. 280.7 an original laboratory testing report 
described in section 5(c) of the Act and Sec. 280.6 of this part and a 
manufacturer's certificate of conformance for each lot of fasteners 
subject to the Act and this part which that manufacturer, importer, 
private label distributor, or alteror who significantly alters any 
fastener offers for sale or sells in commerce. Such certificate shall, 
as a minimum, include: Fastener description information contained in 
Sec. 280.6(a)(4) of this part; the date of issue and serial number of 
the laboratory testing report; and
A statement certifying that the fasteners have been manufactured 
according to the requirements of the applicable standards and 
specifications and found to conform with its requirements. The 
requirements of this paragraph shall not apply to an alteror who 
significantly alters fasteners and who delivers to the purchaser the 
written statement provided for by Sec. 280.11(a)(3) of this part.

Sec. 280.6  Laboratory test reports.

    (a) When performing tests for which they are accredited under this 
part, each laboratory accredited under subparts C, D, or E of this part 
and currently listed in the Accredited Laboratory List shall issue test 
reports of its work which accurately, clearly, and unambiguously 
present the test conditions, test set-up, test results, and all 
information required by this section. All reports must be in English or 
be translated into English, must be signed by an approved signatory, 
must be protected by a tamper resistant system, and contain the 
following information:
    (1) Name and address of the laboratory;
    (2) Unique identification of the test report including date of 
issue and serial number, or other appropriate means;
    (3) Name and address of client;
    (4) Fastener Description, including:
    (i) Manufacturer (name and address);
    (ii) Product family (screw, nut, bolt, washer, or stud), drive and/
or head configurations as applicable;

[[Page 50561]]

    (iii) Date of manufacture;
    (iv) Head markings (describe or draw manufacturer's recorded 
insignia and grade identification or property class symbols);
    (v) Nominal dimensions (diameter; length of bolt, screw or stud; 
thickness of load bearing washer); thread form and class of fit;
    (vi) Product standards and specifications related to the laboratory 
in writing by the manufacturer, importer or distributor;
    (vii) Lot number;
    (viii) Specification and grade of material;
    (ix) Coating material and standard and specification as applicable;
    (5) Sampling information:
    (i) Standards and specifications or reference for sampling scheme;
    (ii) Production lot size and the number sampled and tested;
    (iii) Name and affiliation of person performing the lot sampling;
    (6) Test results:
    (i) Actual tests required by the standard and specification;
    (ii) Test results for each sample;
    (iii) All deviations from the test method;
    (iv) All other items required on test reports according to the test 
method;
    (v) Where the report contains results of tests performed by sub-
contractors, these results shall be clearly identified along with the 
name of the laboratory and accreditation information listed in 
paragraph (a)(10) of this section.
    (vi) A statement that the samples tested either conform or do not 
conform to the fastener standards and specifications or standards and 
identification of any nonconformance, except as provided for in 
Secs. 280.13 and 280.14;
    (7) A statement that the report must not be reproduced except in 
full;
    (8) A statement to the effect that the test report relates only to 
the item(s) tested;
    (9) Name, title and signature of approved signatory accepting 
technical responsibility for the tests and test report;
    (10) The name of the body which accredited the laboratory for the 
specific tests performed which are the subject of the report, and code 
number assigned to the laboratory by the accreditation body, and the 
expiration of accreditation.
    (b) For alternative chemical tests carried out under Sec. 280.15 of 
this part, each laboratory accredited under subparts C, D, or E of this 
part and currently listed in the Accredited Laboratory List shall 
provide to the fastener manufacturer, either directly or through the 
metal manufacturer, a written inspection and testing report containing 
all required information. All reports must be in English or be 
translated into English, must be signed by an approved signatory, must 
be protected by a tamper resistant system, and contain the following 
information:
    (1) Name and address of the laboratory;
    (2) Unique identification of the test report including date of 
issue and serial number or other appropriate means.
    (3) Name and address of client;
    (4) Coil or heat number of metal being tested;
    (5) Test results:
    (i) Actual tests required by the standards and specifications;
    (ii) Test results for each sample;
    (iii) All deviations from the test method;
    (iv) All other items required on test reports according to the test 
method;
    (v) Where the report contains results of tests performed by sub-
contractors, these results shall be clearly identified along with the 
name of the laboratory and accreditation information listed in 
paragraph (b)(9) of this section.
    (vi) A statement that the samples tested either conform or do not 
conform to the metal standards and specifications and identification of 
any nonconformance;
    (6) A statement that the report must not be reproduced except in 
full;
    (7) A statement to the effect that the test report relates only to 
the item(s) tested;
    (8) Name, title and signature of approved signatory accepting 
technical responsibility for the tests and test report;
    (9) The name of the body which accredited the laboratory for the 
specific tests performed which are the subject of the report, and code 
number assigned to the laboratory by the accreditation body, and the 
expiration of accreditation.
    (c) The laboratory shall issue corrections or additions to a test 
report only by a further document suitably marked, e.g. ``Supplement to 
test report serial number * * *'' This document must specify which test 
result is in question, the content of the result, the explanation of 
the result, and the reason for acceptance of the result.

Sec. 280.7  Recordkeeping requirements.

    (a) Each laboratory accredited under subparts C, D, or E of this 
part shall retain for 5 years after the performance of a test all 
records pertaining to that test concerning the inspection and testing, 
and certification, of fasteners under the Act and these regulations. 
The final test report or the test records maintained by the laboratory 
shall contain sufficient information to permit the test to be repeated 
at a later time if a retest is necessary. The laboratory shall maintain 
the test report and a record of all original observations, 
calculations, and derived data. The records shall include the identity 
of personnel involved in sample preparation and testing. Procedures for 
storage and retrieval of records must be documented and maintained in 
the laboratory's quality manual.
    (b) Manufacturers, importers, private label distributors, and 
persons who significantly alter fasteners shall retain for 5 years 
after the performance of a test all records pertaining to that test 
concerning the inspection and testing, and certification, of fasteners 
under the Act and these regulations.
    (c) Original records required. Persons required to keep records 
under this part must maintain the original records in the form in which 
that person receives or creates them unless that person meets all of 
the conditions of paragraph (d) of this section relating to 
reproduction of records. Original laboratory test reports described in 
Secs. 280.5, 280.6, 280.13 and 280.15(b) of this part must be kept.
    (d) Reproduction of original records. A person required to keep 
records under this part may maintain reproductions of documents other 
than laboratory test reports instead of the original records using any 
photographic, photostatic, miniature photographic, micrographic, 
automated archival storage, or other process that completely, 
accurately, legibly and durably reproduces the original records 
(whether on paper, microfilm, or through electronic digital storage 
techniques). The process must meet all of the requirements of 
paragraphs (d)(1) through (d)(9) of this section.
    (1) The system must be capable of reproducing all records on paper.
    (2) The system must record and be able to reproduce all marks, 
information, and other characteristics of the original record, 
including both obverse and reverse sides of paper documents in legible 
form.
    (3) When displayed on a viewer, monitor, or reproduced on paper, 
the records must exhibit a high degree of legibility and readability. 
(For purposes of this section, legible and legibility mean the quality 
of a letter or numeral that enable the observer to identify it 
positively and quickly to the exclusion of all other letters or 
numerals. Readable and readability mean the quality of a group of 
letters or numerals being recognized as complete words or numbers.)
    (4) The system must preserve the initial image (including both 
obverse

[[Page 50562]]

and reverse sides of paper documents) and record all changes, who made 
them and when they were made. This information must be stored in such a 
manner that none of it may be altered once it is initially recorded.
    (5) The regulated person must establish written procedures to 
identify the individuals who are responsible for the operation, use and 
maintenance of the system.
    (6) The regulated person must establish written procedures for 
inspection and quality assurance of records in the system and document 
the implementation of those procedures.
    (7) The system must be complete and contain all records required to 
be kept by this part or the regulated person must provide a method for 
correlating, identifying and locating records relating to the same 
transaction(s) that are kept in other record keeping systems.
    (8) The regulated person must keep a record of where, when, by 
whom, and on what equipment the records and other information were 
entered into the system.
    (9) Upon request by the Bureau of Export Administration or NIST, 
the regulated person must furnish, at the examination site, the 
records, the equipment and, if necessary, knowledgeable personnel for 
locating, reading, and reproducing any record in the system.
    (e) Destruction or disposal of records. If the Bureau of Export 
Administration, NIST or any other government agency makes a formal or 
informal request for any record or records, such record or records may 
not be destroyed or disposed of without the written authorization of 
the agency concerned. This prohibition applies even if such records 
have been retained for a period of time exceeding that required by 
paragraphs (a) or (b) of this section.
    (f) All persons required to keep records by this part must furnish 
those records when requested to do so by an employee of the Bureau of 
Export Administration or NIST.

Sec. 280.8  Ownership of laboratories by manufacturers.

    (a) If the Director finds that, as to a specific type of fastener, 
and as to a specific type of inspection or testing, a ban on 
manufacturer ownership or affiliation with a laboratory performing 
tests under the Act and these regulations would increase the protection 
of health and safety of the public or industrial workers, the Director 
may impose such a ban.
    (b) Before imposing a ban under paragraph (a) of this section, the 
Director shall provide advance notice and the opportunity for public 
comment.

Sec. 280.9  Subcontracting of testing.

    (a) Whenever a laboratory accredited under subparts C, D, or E of 
this part issues a test report under the Act and this part, it is 
implied that the report reflects work performed, and results obtained, 
by the personnel, equipment, and procedures of that laboratory. 
However, in some cases a laboratory may require the use of another 
facility due to equipment failure, need for specialized equipment, work 
overload, or to perform tests outside the laboratory's own scope of 
accreditation.
    (b) Whenever a laboratory accredited under subparts C, D, or E of 
this part subcontracts to another laboratory for the performance of any 
test or portion of a test it must:
    (1) Place the work with another laboratory accredited under either 
subpart C, D, or E of this part;
    (2) Inform the client, before the fact, that subcontracting will be 
necessary; and
    (3) Clearly identify in its records, and in the report to the 
client, specifically which test method(s) or portions of a test 
method(s) were performed by the accredited laboratory and which were 
performed by the subcontractor.

Sec. 280.10  Sampling.

    In the event that the standard or specification to which a 
manufacturer represents the fasteners in a particular sample to have 
been manufactured does not provide for the size, selection or integrity 
of the sample to be inspected and tested, the sample shall be 
determined in accordance with ASME/ANSI B18.18.2M, Inspection and 
Quality Assurance For High-Volume Machine Assembly Fasteners; ASME/ANSI 
B18.18.3M, Inspection and Quality Assurance for Special Purpose 
Fasteners; or ASME/ANSI B18.18.4M, Inspection and Quality Assurance for 
Highly Specialized Engineering Applications--Fasteners, as appropriate.

Sec. 280.11  Significant alterations of fasteners.

    (a) Any alteror who significantly alters a fastener so that it no 
longer conforms to the description in the relevant test report issued 
under section 5(c) of the Act or this part, and who thereafter offers 
for sale or sells such significantly altered fastener, shall:
    (1) Assign a new lot number;
    (2) Apply his or her registered insignia to the significantly 
altered fastener if the standards and specifications to which the 
fastener was originally manufactured required the fastener to bear a 
raised or depressed insignia identifying its manufacturer or private 
label distributor; and
    (3) Be treated as a manufacturer for the purposes of the Act and 
this part, and shall cause the fastener to be inspected and tested as 
required by section 5 of the Act and by this part unless the 
significantly altered fastener is delivered to a purchaser accompanied 
by a written statement noting the original lot number and the new lot 
number assigned by the alteror, disclosing the subsequent alteration, 
and warning that such alteration may affect the dimensional or physical 
characteristics of the fastener.
    (b) If the significant alteration is only electroplating of 
fasteners having a specified Rockwell C hardness of 32 or above, the 
requirements set forth in paragraphs (a)(2) and (a)(3) of this section 
shall not apply, but the alteror shall assign a new lot number as set 
forth in paragraph (a)(1) of this section and shall test the 
electroplated fasteners as required by the plating standards and 
specifications.
    (c) Any person who knowingly sells a significantly altered fastener 
as described in paragraph (a) of this section, and who did not alter 
such fastener, shall provide to the purchaser a copy of the statement 
required by paragraph (a)(3) of this section; unless the significant 
alteration is only electroplating of the fastener, as described in 
paragraph (b) of this section.
    (d) If the alteration is not a significant alteration, the 
requirements set forth in paragraph (a) of this section shall not 
apply, and the only testing requirements which apply are those required 
by the standards and specifications to which the alteration is 
performed. If the alteration involves cutting of threaded studs, rods, 
or bars into studs, these cut fasteners must be marked with the grade 
or property class identification marking appearing on the original 
threaded studs, rods, and bars.

Sec. 280.12   Applicability.

    (a) The requirements of the Fastener Quality Act and this part 
shall be applicable only to fasteners manufactured on or after May 27, 
1997.
    (b) Metal manufactured prior to May 27, 1997 may not be used to 
manufacture fasteners subject to the Act and this part, unless the 
metal has been tested for chemistry pursuant to Sec. 280.15 of this 
part by a laboratory accredited under the Act and this part and the 
chemical characteristics of the metal conform to those required by the 
standards and specifications.

[[Page 50563]]

    (c) Nothing in the Act and this part prohibits selling finished 
fasteners manufactured prior to May 27, 1997 or representing that such 
fasteners meet standards and specifications of a consensus standards 
organization or a government agency. Fasteners manufactured prior to 
May 27, 1997 may not be represented as being in conformance with the 
Act or this part.

Sec. 280.13   Imports of fasteners.

    (a) Except as provided in paragraph (b) of this section, it shall 
be unlawful for any person to sell to an importer, and for any importer 
to purchase any shipment of fasteners or fastener sets manufactured 
outside the United States unless such shipment to an importer is 
accompanied by a manufacturer's certificate of conformance, an original 
laboratory testing report with respect to each lot from which the 
fasteners are taken, and any other relevant lot identification 
information.
    (b) The requirement that delivery of fasteners to any importer must 
be accompanied by an original laboratory testing report shall not 
apply:
    (1) In the case of fasteners imported into the United States as 
products manufactured within a nation which is party to a 
congressionally approved free trade agreement with the United States 
that is in effect, provided that the Director has published in the 
Federal Register a certification that satisfactory arrangements have 
been reached by which purchasers within the United States can readily 
gain access to an original laboratory test report for such fasteners; 
or,
    (2) In the case of fasteners imported into the United States as 
Canadian-origin products under the United States-Canada Automobile Pact 
for use as original equipment in the manufacture of motor vehicles.

Sec. 280.14   Option for importers and private label distributors.

    (a) Notwithstanding the provisions of Sec. 280.13 of this part, 
delivery of a lot, or portion of a lot, of fasteners may be made by a 
manufacturer to an importer or private label distributor without the 
required original copy of the laboratory testing report if--
    (1) The manufacturer provides to the importer or private label 
distributor a certificate which, as a minimum, includes fastener 
description information contained in Sec. 280.6(a)(4), and a statement 
by the manufacturer certifying that the fasteners have been 
manufactured according to the requirements of the applicable standard 
or specification, but have not been tested by a laboratory accredited 
in accordance with section 6 of the Act; and
    (2) The importer or private label distributor assumes 
responsibility in writing for the inspection and testing of such lot or 
portion by a laboratory accredited in accordance with the procedures 
set out in this Part.
    (b) If the importer or private label distributor assumes the 
responsibility in writing for the inspection and testing of such lot or 
portion, the provisions of section 5(a), (b) and (c) of the Act shall 
apply to the importer or private label distributor in the same manner 
and to the same extent as to a manufacturer; except that the importer 
or private label distributor shall provide to the testing laboratory 
the certificate described under paragraph (a)(1) of this section.

Sec. 280.15   Alternative procedure for chemical characteristics.

    Notwithstanding any other provision of this regulation, a 
manufacturer shall be deemed to have demonstrated that the chemical 
characteristics of a lot conform to the standards and specifications to 
which the manufacturer represents such lot has been manufactured if the 
following requirements are met:
    (a) The coil or heat number of metal from which such lot was 
fabricated has been inspected and tested with respect to its chemical 
characteristics by a laboratory accredited in accordance with the Act 
and these regulations;
    (b) Such laboratory has provided to the manufacturer, either 
directly or through the metal manufacturer, a written inspection and 
testing report, prepared in accordance with Sec. 280.6 of this part, 
listing the chemical characteristics of such coil or heat number;
    (c) The report described in paragraph (b) of this section indicates 
that the chemical characteristics of such coil or heat number conform 
to those required by the standards and specifications to which the 
manufacturer represents such lot has been manufactured; and,
    (d) The manufacturer demonstrates that such lot has been fabricated 
from the coil or heat number of metal to which the report described in 
paragraphs (b) and (c) of this section relates.

Sec. 280.16   Subsequent purchaser.

    (a) If a purchaser of fasteners requests the seller to mark the 
container of fasteners with the lot number from which such fasteners 
were taken, either prior to the sale or at the time of sale, the seller 
shall conspicuously mark the container of fasteners with the lot 
number.
    (b) The seller shall provide copies of any applicable laboratory 
testing report or certification of conformance upon request to the 
subsequent purchaser of fasteners taken from the lot to which such 
testing report or manufacturer's certificate of conformance relates.

Subpart B--Laboratory Accreditation

Sec. 280.100   Introduction.

    The Fastener Quality Act sets out three alternatives by which a 
laboratory may become accredited for testing under the Act. This 
regulation sets out implementing procedures for each of those 
alternatives:
    (a) Subpart C of this part contains procedures by which the 
National Institute of Standards and Technology's National Voluntary 
Laboratory Accreditation Program will accredit laboratories for the 
testing of fasteners under the Act;
    (b) Subpart D of this part sets out procedures under which private 
entities may apply to NIST for approval to engage directly in the 
accreditation of laboratories for the testing of fasteners under the 
Act; and
    (c) Subpart E of this part sets out conditions under which the 
accreditation of foreign laboratories by their governments or 
organizations recognized by the Director shall be deemed to satisfy the 
laboratory accreditation requirements for the testing of fasteners 
under the Act.

Sec. 280.101   Accredited laboratory list.

    NIST shall prepare and maintain an Accredited Laboratory List of 
laboratories accredited under subparts C, D, and E of this part. Only 
laboratory test reports covering tests performed by a laboratory listed 
in the Accredited Laboratory List at the time the report was issued, 
and which are within the scope of the laboratory's accreditation, shall 
be deemed to meet the requirements of the Act.

Sec. 280.102   Procedures for inclusion in the accredited laboratory 
list.

    (a) NVLAP, and all entities approved by NIST under subpart D of 
this part or recognized by NIST under subpart E of this part shall 
promptly notify NIST of each accreditation action taken under subparts 
C, D, or E of this part, respectively. Accreditation actions include 
initial accreditation, denials of accreditation, renewals, suspensions, 
terminations, revocations and changes in scope. Notifications shall be 
filed with: Fastener Quality Act Program Manager, Office of Standards 
Services, National Institute of Standards and Technology, Gaithersburg, 
Maryland 20899.

[[Page 50564]]

    (b) Each notification to NIST shall include the following 
information, in English: The name of the laboratory accreditation body 
which granted the accreditation; the name and address of the laboratory 
affected by the accreditation action; the nature of the accreditation 
action; a copy of the laboratory's accreditation certificate and a 
scope of accreditation which states the fastener test methods for which 
it has been accredited; the name and telephone number of the authorized 
representative(s) and approved signatory(s) of the fastener testing 
laboratory; information concerning the physical locations of all 
organizational units involved in accredited fastener testing, and the 
specific scope of fastener testing for each organizational unit for 
which accreditation has been granted.
    (c) NIST shall revise as appropriate the Accredited Laboratory List 
when notified of accreditation actions and shall take appropriate steps 
to make information changes promptly available to the public.

Sec. 280.103   Removal from the accredited laboratory list.

    (a) NIST may remove from the Accredited Laboratory List any 
fastener testing laboratory accredited under subpart C, D or E of this 
part if NIST deems such action to be in the public interest. Laboratory 
test reports describing tests performed by a laboratory after it has 
been removed from the Accredited Laboratory List under this section 
shall not be deemed to meet the requirements of the Act.
    (b) A laboratory may appeal the removal or proposed removal from 
the Accredited Laboratory List to the Director by submitting a 
statement of reasons why the laboratory should remain on the list. NIST 
may, at its discretion, hold in abeyance a removal action pending a 
final decision by the Director. The Director shall inform the 
laboratory in writing of the decision within sixty days following 
receipt of the appeal.

Subpart C--NIST Fastener Laboratory Accreditation Procedures

Sec. 280.200   Introduction.

    This subpart sets out the procedures and technical requirements of 
the NVLAP Fasteners Testing Program (``the Program'') for the 
accreditation of laboratories that test fasteners. Laboratories which 
are granted accreditation under this program for certain tests will be 
eligible to provide testing services and test reports required by the 
Fastener Quality Act for those tests. Accreditation may be granted to 
any laboratory (including: Commercial; manufacturers'; university; and 
laboratories located in foreign countries) that demonstrates competence 
to provide services according to the criteria specified in this 
subpart. It is up to the laboratory to select the areas and specific 
tests within each area for its proposed scope of accreditation. A 
laboratory may be accredited to test and/or measure fasteners in any 
one or more of the areas of chemical, dimensional, nondestructive, 
mechanical and physical, or metallography testing. Laboratories located 
outside of the U.S. must meet certain additional requirements 
including: Additional fees for travel outside the U.S. and provision of 
a language translator.

Sec. 280.201   Applicability of part 285, title 15, Code of Federal 
Regulations.

    As permitted by section 6 of the Act, and for the purposes of that 
Act only, the provisions of part 285, title 15 of the Code of Federal 
Regulations are superseded by the procedures and requirements set forth 
in this Subpart. The provisions of part 285, title 15 of the Code of 
Federal Regulations remain in effect except as they pertain to 
laboratory accreditation actions required by the Act.

Sec. 280.202   Establishment of the Program.

    (a) NVLAP shall develop the technical requirements for the Program 
based on expert advice.
    (b) As a means of assuring effective and meaningful cooperation, 
input, and participation by those federal agencies that may have an 
interest in and may be affected by the Program, NVLAP may communicate 
and consult with appropriate officials within those agencies.
    (c) When NVLAP has completed the development of the technical 
requirements of the Program and established a schedule of fees for 
accreditation, NVLAP shall publish a notice in the Federal Register 
announcing the establishment of the Program.
    (d) The notice will:
    (1) Identify the scope of the Program;
    (2) Advise how to apply for accreditation.
    (e) NVLAP shall establish fees in amounts that will enable the 
Program to be self-sufficient. NVLAP shall revise the fees when 
necessary to maintain self-sufficiency.

Sec. 280.203  Adding to or modifying the program.

    (a) The Program may be added to, modified, or realigned based on 
either a written request from any person wishing to add or delete 
specific standards, test methods, or types of test methods or a need 
identified by NVLAP.
    (b) NVLAP may choose to make the additions or modifications 
available for accreditation when:
    (1) The additional standards, test methods, or types of test 
methods requested are directly relevant to the Program;
    (2) It is feasible and practical to accredit testing laboratories 
for the additional standards, test methods, or types of test methods; 
and
    (3) It is likely that laboratories will seek accreditation for the 
additional standards, test methods, or types of test methods.

Sec. 280.204  NVLAP Program Handbook.

    All specific laboratory accreditation requirements and NVLAP 
interpretations shall be documented in a program handbook which NVLAP 
shall develop and maintain. The handbook shall be made available to all 
participating laboratories. NVLAP may prepare a NVLAP Program Handbook 
for the Fastener Testing Program for use by applicant and accredited 
laboratories. The purpose of the handbook is to provide specific 
technical details for fastener testing as they apply to on-site 
assessment, proficiency testing, test equipment and facilities, and 
scope of accreditation.

Sec. 280.205  Applying for accreditation.

    (a) A laboratory may request an application for accreditation in 
the Program in accordance with instructions provided in notices 
announcing the Program's formal establishment.
    (b) Upon receipt of a laboratory's application, NVLAP shall:
    (1) Acknowledge receipt of the application;
    (2) Request further information, if necessary;
    (3) Confirm payment of fees before proceeding with the 
accreditation process; and
    (4) Specify the next step(s) in the accreditation process.
    (c) All laboratory accreditation documents must be in English or 
the laboratory seeking accreditation must supply an English translation 
of all documents at the time it files its application.
    (d) Accreditation of laboratories outside the United States may 
require payment of additional traveling expenses for on-site 
assessments and proficiency testing.

[[Page 50565]]

Sec. 280.206  Assessing and evaluating a laboratory.

    (a) Information used to evaluate a laboratory's compliance with the 
conditions for accreditation set out in Sec. 280.214, the criteria for 
accreditation set out in Sec. 280.215, and the technical requirements 
established will include:
    (1) Application and other material submitted by the laboratory 
(Sec. 280.214(b)).
    (2) On-site assessment reports;
    (3) Laboratory performance on proficiency tests;
    (4) Laboratory responses to identified deficiencies; and
    (5) Technical evaluation.
    (b) NVLAP shall arrange the assessment and evaluation of applicant 
laboratories in such a way as to minimize potential conflicts of 
interest.
    (c) NVLAP shall inform each applicant laboratory of any action(s) 
that the laboratory must take to qualify for accreditation.

Sec. 280.207  Granting and renewing accreditation.

    (a) NVLAP will take action to grant initial accreditation, or 
renew, suspend, or propose to deny or revoke accreditation of an 
applicant laboratory, based on the degree to which the laboratory 
complies with the specific NVLAP requirements. Accreditation shall be 
granted for a one year period. Before initial accreditation and every 2 
years thereafter, an on-site assessment of each laboratory shall be 
conducted to determine compliance with the NVLAP criteria.
    (b) If accreditation is granted or renewed, NVLAP shall:
    (1) Provide a Certificate of Accreditation and a Scope of 
Accreditation to the laboratory;
    (2) Provide guidance on referencing the laboratory's accredited 
status, and the use of the NVLAP logo by the laboratory and its 
clients, as needed; and
    (3) Remind the laboratory that accreditation does not relieve it 
from complying with applicable federal, state, and local laws and 
regulations.
    (c) NVLAP shall notify an accredited laboratory at least 30 days 
before its accreditation expires advising of the action(s) the 
laboratory must take to renew its accreditation.

Sec. 280.208  Denying, suspending, and revoking accreditation.

    (a) If NVLAP proposes to deny or revoke accreditation of a 
laboratory, NVLAP shall inform the laboratory of the reasons for the 
proposed denial or revocation and the procedure for appealing such a 
decision.
    (b) The laboratory will have 30 days from the date of receipt of 
the proposed denial or revocation letter to appeal the decision to the 
Director of NIST. If the laboratory appeals the decision to the 
Director of NIST, the proposed denial or revocation will be stayed 
pending the outcome of the appeal. The proposed denial or revocation 
will become final through the issuance of a written decision to the 
laboratory in the event that the laboratory does not appeal the 
proposed denial or revocation within that 30-day period.
    (c) If NVLAP finds that an accredited laboratory has violated the 
terms of its accreditation or the provisions of these procedures, NVLAP 
may, after consultation with the laboratory, suspend the laboratory's 
accreditation, or advise of NVLAP's intent to revoke accreditation. If 
accreditation is suspended, NVLAP shall notify the laboratory of that 
action stating the reasons for and conditions of the suspension and 
specifying the action(s) the laboratory must take to have its 
accreditation reinstated.
    (d) A laboratory whose accreditation has been denied, revoked, 
terminated, or expired, or which has withdrawn its application before 
being accredited, may reapply and be accredited if the laboratory:
    (1) Completes the assessment and evaluation process; and
    (2) Meets the conditions and criteria for accreditation that are 
set out in sections 280.214 and 280.215.
    (e) Conditions of suspension will include prohibiting the 
laboratory from using the NVLAP logo on its test reports during the 
suspension period. The determination of NVLAP whether to suspend or to 
propose revocation of a laboratory's accreditation will depend on the 
nature of the violation(s) of the terms of its accreditation.

Sec. 280.209  Voluntary termination of accreditation.

    A laboratory may at any time terminate its participation and 
responsibilities as an accredited laboratory by advising NVLAP in 
writing of its desire to do so. NVLAP shall terminate the laboratory's 
accreditation and shall notify the laboratory stating that its 
accreditation has been terminated in response to its request.

Sec. 280.210  Change in status of laboratory.

    Accreditation of a laboratory is based on specific conditions and 
criteria including the laboratory ownership, location, staffing, 
facilities, and configuration. Changes in any of these conditions or 
criteria could result in loss of accreditation. NVLAP must be informed 
if any of the conditions or criteria for accreditation are changed so 
that a determination can be made concerning the status of the 
accreditation.

Sec. 280.211  Authorized representative.

    The laboratory shall designate an Authorized Representative to sign 
the NVLAP application form and commit the laboratory to fulfill the 
NVLAP requirements. Only the Authorized Representative can authorize a 
change in the scope or nature of the laboratory's application. This 
person will receive all correspondence and inquiries from NVLAP. The 
Authorized Representative may also be an Approved Signatory. The 
laboratory must provide to NVLAP the name and address of the Authorized 
Representative and must, within 30 days, notify NVLAP of a change of 
Authorized Representative.

Sec. 280.212  Approved signatory.

    (a) The laboratory shall designate one or more staff members as 
Approved Signatories. Approved Signatories shall be persons with 
appropriate responsibility, authority and technical capability within 
the organization. The laboratory must maintain a list of Approved 
Signatories and make that list available for review during on-site 
assessments. The laboratory must provide to NVLAP the name(s) and 
address(es) of the Approved Signatory(s) and must, within 30 days, 
notify NVLAP of a change of Approved Signatory(s).
    (b) The authorized signature of at least one Approved Signatory 
must appear on each test reports that is written in compliance with the 
Act and endorsed with the NVLAP logo. The approved signatory is 
responsible for the technical content of the report and is the person 
to be contacted by NVLAP, laboratory clients, or others in case of 
questions or problems with the report.

Sec. 280.213  Application of accreditation conditions and criteria.

    To become accredited and maintain accreditation, a laboratory must 
meet the conditions for accreditation set out in Sec. 280.214, the 
criteria set out in Sec. 280.215, and the guidance provided in the 
Program Handbook.

Sec. 280.214  Conditions for accreditation.

    (a) To become accredited and maintain accreditation, a laboratory 
shall agree in writing to:
    (1) Be assessed and evaluated initially and on a periodic basis;
    (2) Demonstrate, on request that it is able to perform the tests 
representative

[[Page 50566]]

of those for which it is seeking accreditation;
    (3) Pay all fees;
    (4) Participate in proficiency testing as required.
    (5) Be capable of performing the tests for which it is accredited 
according to the latest version of the test method within one year 
after its publication or within another time limit specified by NVLAP;
    (6) Limit the representation of the scope of its accreditation to 
only those tests or services for which accreditation is granted;
    (7) Resolve all deficiencies;
    (8) Limit all its work or services for clients to those areas where 
competence and capacity are available;
    (9) Inform its clients that the laboratory's accreditation or any 
of its test reports in no way constitutes or implies product 
certification, approval, or endorsement by NIST;
    (10) Maintain records of all actions taken in response to testing 
complaints for 5 years, as required by Sec. 280.7 of this part;
    (11) Maintain an independent decisional relationship between itself 
and its clients, affiliates, or other organizations so that the 
laboratory's capacity to render test reports objectively and without 
bias is not adversely affected;
    (12) Report to NVLAP within 30 days any major changes involving the 
location, ownership, management structure, authorized representative, 
approved signatories, or facilities of the laboratory; and
    (13) Return to NVLAP the Certificate of Accreditation and the Scope 
of Accreditation for revision or other action should it:
    (i) Be requested to do so by NVLAP;
    (ii) Voluntarily terminate its accredited status; or
    (iii) Become unable to conform to any of these conditions, the 
applicable criteria of this Subpart or Sec. 280.215, and related 
technical requirements.
    (b) To become accredited and maintain accreditation, a laboratory 
shall supply, upon request, the following information:
    (1) Legal name and full address;
    (2) Ownership of the laboratory;
    (3) Organization chart defining relationships that are relevant to 
performing testing covered in the accreditation request;
    (4) General description of the laboratory, including its facilities 
and scope of operation;
    (5) Name, address, and telephone and FAX number of the authorized 
representative of the laboratory;
    (6) Names or titles and qualifications of laboratory staff 
nominated to serve as approved signatories of test reports that 
reference NVLAP accreditation;
    (7) The laboratory quality manual; and
    (8) Other information as NVLAP may require.

Sec. 280.215  Criteria for accreditation.

    (a) Scope. (1) This section sets out the general requirements in 
accordance with which a laboratory has to demonstrate that it operates, 
if it is to be recognized as competent to carry out specific tests.
    (2) Additional requirements and information which have to be 
disclosed for assessing competence or for determining compliance with 
other criteria may be specified by NVLAP, depending upon the specific 
character of the task of the laboratory.
    (3) This section is for use by testing laboratories in the 
development and implementation of their quality systems. It will also 
be used by NVLAP in the determination of the competence of 
laboratories.
    (b) Organization and management. (1) The laboratory shall be 
legally identifiable. It shall be organized and shall operate in such a 
way that its permanent, temporary and mobile facilities meet the 
requirements of this Subpart.
    (2) The laboratory shall:
    (i) Have managerial staff with the authority and resources needed 
to discharge their duties;
    (ii) Have policies to ensure that its personnel are free from any 
commercial, financial and other pressures which might adversely affect 
the quality of their work;
    (iii) Be organized in such a way that confidence in its 
independence of judgement and integrity is maintained at all times;
    (iv) Specify and document the responsibility, authority and 
interrelation of all personnel who manage, perform or verify work 
affecting the quality of calibrations and tests;
    (v) Provide supervision by persons familiar with the calibration or 
test methods and procedures, the objective of the calibration or test 
and the assessment of the results. The ratio of supervisory to non-
supervisory personnel shall be such as to ensure adequate supervision;
    (vi) Have a technical manager (however named) who has overall 
responsibility for the technical operations;
    (vii) Have a quality manager (however named) who has responsibility 
for the quality system and its implementation. The quality manager 
shall have direct access to the highest level of management at which 
decisions are taken on laboratory policy or resources, and to the 
technical manager. In some laboratories, the quality manager may also 
be the technical manager or deputy technical manager;
    (viii) Nominate deputies in case of absence of the technical or 
quality manager;
    (ix) Have documented policy and procedures to ensure the protection 
of clients' confidential information and proprietary rights;
    (x) Where appropriate, participate in interlaboratory comparisons 
and proficiency testing programs.
    (c) Quality system, audit and review. (1) The laboratory shall 
establish and maintain a quality system appropriate to the type, range 
and volume of calibration and testing activities it undertakes. The 
elements of this system shall be documented. The quality documentation 
shall be available for use by the laboratory personnel. The laboratory 
shall define and document its policies and objectives for, and its 
commitment to, good laboratory practice and quality of calibration or 
testing services. The laboratory management shall ensure that these 
policies and objectives are documented in a quality manual and 
communicated to, understood, and implemented by all laboratory 
personnel concerned. The quality manual shall be maintained current 
under the responsibility of the quality manager.
    (2) The quality manual, and related quality documentation, shall 
state the laboratory's policies and operational procedures established 
in order to meet the requirements of this subpart. The quality manual 
and related quality documentation shall also contain:
    (i) A quality policy statement, including objectives and 
commitments, by top management;
    (ii) The organization and management structure of the laboratory, 
its place in any parent organization and relevant organizational 
charts;
    (iii) The relations between management, technical operations, 
support services and the quality system;
    (iv) Procedures for control and maintenance of documentation;
    (v) Job descriptions of key staff and reference to the job 
descriptions of other staff;
    (vi) Identification of the laboratory's approved signatories;
    (vii) The laboratory's procedures for achieving traceability of 
measurements;
    (viii) The laboratory's scope of calibrations and/or tests;
    (ix) Arrangements for ensuring that the laboratory reviews all new 
work to

[[Page 50567]]

ensure that it has the appropriate facilities and resources before 
commencing such work;
    (x) Reference to the calibration, verification and/or test 
procedures used;
    (xi) Procedures for handling calibration and test items;
    (xii) Reference to the major equipment and reference measurement 
standards used;
    (xiii) Reference to procedures for calibration, verification and 
maintenance of equipment;
    (xiv) Reference to verification practices including interlaboratory 
comparisons, proficiency testing programs, use of reference materials 
and internal quality control schemes;
    (xv) Procedures to be followed for feedback and corrective action 
whenever testing discrepancies are detected, or departures from 
documented policies and procedures occur;
    (xvi) The laboratory management policies for departures from 
documented policies and procedures or from standard specifications;
    (xvii) Procedures for dealing with complaints;
    (xviii) Procedures for protecting confidentiality and proprietary 
rights;
    (xix) Procedures for audit and review.
    (xx) Policies and procedures directly related to compliance with 
this Subpart.
    (3) The laboratory shall arrange for audits of its activities at 
appropriate intervals to verify that its operations continue to comply 
with the requirements of the quality system. Such audits shall be 
carried out by trained and qualified staff who are, wherever possible, 
independent of the activity to be audited. Where the audit findings 
cast doubt on the correctness or validity of the laboratory's 
calibration or test results, the laboratory shall take immediate 
corrective action and shall immediately notify, in writing, any client 
whose work may have been affected.
    (4) The quality system adopted to satisfy the requirements of this 
Section shall be reviewed at least once each year by the management to 
ensure its continuing suitability and effectiveness and to introduce 
any necessary changes or improvements.
    (5) All audit and review findings and any corrective actions that 
arise from them shall be documented. The person responsible for quality 
shall ensure that these actions are discharged within the agreed 
timescale.
    (6) In addition to periodic audits the laboratory shall ensure the 
quality of results provided to clients by implementing checks. These 
checks shall be reviewed and shall include, as appropriate, but not be 
limited to:
    (i) Internal quality control schemes using whenever possible 
statistical techniques;
    (ii) Participation in proficiency testing or other interlaboratory 
comparisons;
    (iii) Regular use of certified reference materials and/or in-house 
quality control using secondary reference materials;
    (iv) Replicate testings using the same or different methods;
    (v) Re-testing of retained items;
    (vi) Correlation of results for different characteristics of an 
item.
    (d) Personnel. (1) The testing laboratory shall have sufficient 
personnel, having the necessary education, training, technical 
knowledge and experience for their assigned functions.
    (2) The testing laboratory shall ensure that the training of its 
personnel is kept up-to-date.
    (3) Records on the relevant qualifications, training, skills and 
experience of the technical personnel shall be maintained by the 
laboratory.
    (e) Accommodation and environment. (1) Laboratory accommodation, 
calibration and test areas, energy sources, lighting, heating and 
ventilation shall be such as to facilitate proper performance of 
calibrations or tests.
    (2) The environment in which these activities are undertaken shall 
not invalidate the results or adversely affect the required accuracy of 
measurement. Particular care shall be taken when such activities are 
undertaken at sites other than the permanent laboratory premises.
    (3) The laboratory shall provide facilities for the effective 
monitoring, control and recording of environmental conditions as 
appropriate. Due attention shall be paid, for example, to biological 
sterility, dust, electromagnetic interference, humidity, voltage, 
temperature, and sound and vibration levels, as appropriate to the 
calibrations or tests concerned.
    (4) There shall be effective separation between neighboring areas 
when the activities therein are incompatible.
    (5) Access to and use of all areas affecting the quality of these 
activities shall be defined and controlled.
    (6) Adequate measures shall be taken to ensure good housekeeping in 
the laboratory.
    (f) Equipment and reference materials. (1) The laboratory shall be 
furnished with all items of equipment (including reference materials) 
required for the correct performance of calibrations and tests. In 
those cases where the laboratory needs to use equipment outside its 
permanent control it shall ensure that the relevant requirements of 
this Section are met.
    (2) All equipment shall be properly maintained. Maintenance 
procedures shall be documented. Any item of equipment which has been 
subjected to overloading or mishandling, or which gives suspect 
results, or has been shown by verification or otherwise to be 
defective, shall be taken out of service, clearly identified and 
wherever possible stored at a specified place until it has been 
repaired and shown by calibration, verification or test to perform 
satisfactorily. The laboratory shall examine the effect of this defect 
on previous calibrations or tests.
    (3) Each item of equipment including reference materials shall, 
when appropriate, be labeled, marked or otherwise identified to 
indicate its calibration status.
    (4) Records shall be maintained of each item of equipment and all 
reference materials significant to the calibrations or tests performed. 
The records shall include:
    (i) The name of the item of equipment;
    (ii) The manufacturer's name, type identification, and serial 
number or other unique identification;
    (iii) Date received and date placed in service;
    (iv) Current location, where appropriate;
    (v) Condition when received (e.g. new, used, reconditioned);
    (vi) Copy of the manufacturer's instructions, where available;
    (vii) Dates and results of calibrations and/or verifications and 
date of next calibration and/or verification;
    (viii) Details of maintenance carried out to date and planned for 
the future;
    (ix) History of any damage, malfunction, modification or repair.
    (g) Measurement traceability and calibration. (1) All measuring and 
testing equipment having an effect on the accuracy or validity of 
calibrations or tests shall be calibrated and/or verified before being 
put into service. The laboratory shall have an established program for 
the calibration and verification of its measuring and test equipment.
    (2) The overall program of calibration and/or verification and 
validation of equipment shall be designed and operated so as to ensure 
that, wherever applicable, measurements made by the laboratory are 
traceable to national standards of measurement where available. 
Calibration certificates shall wherever applicable indicate the 
traceability to national standards of measurement and shall provide the

[[Page 50568]]

measurement results and associated uncertainty of measurement and/or a 
statement of compliance with an identified metrological specification.
    (3) Where traceability to national standards of measurement is not 
applicable, the laboratory shall provide satisfactory evidence of 
correlation of results, for example by participation in a suitable 
program of interlaboratory comparisons or proficiency testing.
    (4) Reference standards of measurement held by the laboratory shall 
be used for calibration only and for no other purpose, unless it can be 
demonstrated that their performance as reference standards has not been 
invalidated.
    (5) Reference standards of measurement shall be calibrated by a 
body that can provide traceability to a national standard of 
measurement. There shall be a program of calibration and verification 
for reference standards.
    (6) Where relevant, reference standards and measuring and testing 
equipment shall be subjected to in-service checks between calibrations 
and verifications.
    (7) Reference materials shall, where possible, be traceable to 
national or international standards of measurement, or to national or 
international standard reference materials.
    (h) Calibration and test methods. (1) The laboratory shall have 
documented instructions on the use and operation of all relevant 
equipment, on the handling and preparation of items and for calibration 
and/or testing, where the absence of such instructions could jeopardize 
the calibrations or tests. All instructions, standards, manuals and 
reference data relevant to the work of the laboratory shall be 
maintained up-to-date and be readily available to the staff.
    (2) The laboratory shall use appropriate methods and procedures for 
all calibrations and tests and related activities within its 
responsibility (including sampling, handling, transport and storage, 
preparation of items, estimation of uncertainty of measurement and 
analysis of calibration and/or test data). They shall be consistent 
with the accuracy required, and with any standard specifications 
relevant to the calibrations or tests concerned.
    (3) Where methods are not specified, the laboratory shall, wherever 
possible, select methods that have been published in international or 
national standards, those published by reputable technical 
organizations or in relevant scientific texts or journals.
    (4) Where it is necessary to employ methods that have not been 
established as standard, these shall be subject to agreement with the 
client, be fully documented and validated, and be available to the 
client and other recipients of the relevant reports.
    (5) Where sampling is carried out as part of the test method, the 
laboratory shall use documented procedures and appropriate statistical 
techniques to select samples.
    (6) Calculations and data transfers shall be subject to appropriate 
checks.
    (7) Where 
FR Doc. 96-24105 Procedures for Implementation of the Fastener Quality Act
computers or automated equipment are used for the 
capture, processing, manipulation, recording, reporting, storage or 
retrieval of calibration or test data, the laboratory shall ensure 
that:
    (i) The requirements of this subpart are complied with;
    (ii) Computer software is documented and adequate for use;
    (iii) Procedures are established and implemented for protecting the 
integrity of data; such procedures shall include, but not be limited 
to, integrity of data entry or capture, data storage, data transmission 
and data processing;
    (iv) Computer and automated equipment is maintained to ensure 
proper functioning and provided with the environmental and operating 
conditions necessary to maintain the integrity of calibration and test 
data;
    (v) It establishes and implements appropriate procedures for the 
maintenance of security of data including the prevention of 
unauthorized access to, and the unauthorized amendment of, computer 
records.
    (8) Documented procedures shall exist for the purchase, reception 
and storage of consumable materials used for the technical operations 
of the laboratory.
    (i) Handling of calibration and test items. (1) The laboratory 
shall have a documented system for uniquely identifying the items to be 
calibrated or tested, to ensure that there can be no confusion 
regarding the identity of such items at any time.
    (2) Upon receipt, the condition of the calibration or test item, 
including any abnormalities or departures from standard conditions as 
prescribed in the relevant calibration or test method, shall be 
recorded. Where there is any doubt as to the item's suitability for 
calibration or test, where the item does not conform to the description 
provided, or where the calibration or test required is not fully 
specified, the laboratory shall consult the client for further 
instruction before proceeding. The laboratory shall establish whether 
the item has received all necessary preparation, or whether the client 
requires preparation to be undertaken or arranged by the laboratory.
    (3) The laboratory shall have documented procedures and appropriate 
facilities to avoid deterioration or damage to the calibration or test 
item, during storage, handling, preparation, and calibration or test; 
any relevant instructions provided with the item shall be followed. 
Where items have to be stored or conditioned under specific 
environmental conditions, these conditions shall be maintained, 
monitored and recorded where necessary. Where a calibration or test 
item or portion of an item is to be held secure (for example, for 
reasons of record, safety or value, or to enable check calibrations or 
tests to be performed later), the laboratory shall have storage and 
security arrangements that protect the condition and integrity of the 
secured items or portions concerned.
    (4) The laboratory shall have documented procedures for the 
receipt, retention or safe disposal of calibration or test items, 
including all provisions necessary to protect the integrity of the 
laboratory.
    (j) Records. (1) The laboratory shall maintain a record system to 
suit its particular circumstances and comply with any applicable 
regulations. It shall retain on record all original observations, 
calculations and derived data, calibration records and a copy of the 
calibration certificate, test certificate or test report for an 
appropriate period as required in Sec. 280.7. The records for each 
calibration and test shall contain sufficient information to permit 
their repetition. The records shall include the identity of personnel 
involved in sampling, preparation, calibration or testing.
    (2) All records (including those listed in Sec. 280.215(f)(4) 
pertaining to calibration and test equipment), certificates and reports 
shall be safely stored, held secure and in confidence to the client.
    (k) Certificates and reports. (1) The results of each calibration, 
test, or series of calibrations or tests carried out by the laboratory 
shall be reported accurately, clearly, unambiguously and objectively, 
in accordance with any instructions in the calibration or test methods. 
The results should normally be reported in a calibration certificate, 
test report or test certificate and should include all the information 
necessary for the interpretation of the calibration or test results and 
all information required by the method used.
    (2) Where the certificate or report contains results of 
calibrations or tests

[[Page 50569]]

performed by sub-contractors, these results shall be clearly 
identified.
    (3) Particular care and attention shall be paid to the arrangement 
of the certificate or report, especially with regard to presentation of 
the calibration or test data and ease of assimilation by the reader. 
The format shall be carefully and specifically designed for each type 
of calibration or test carried out, but the headings shall be 
standardized as far as possible.
    (4) Material amendments to a calibration certificate, test report 
or test certificate after issue shall be made only in the form of a 
further document, or data transfer including the statement ``Supplement 
to Calibration Certificate for Test Report or Test Certificate, serial 
number * * * or as otherwise identified'', or equivalent form of 
wording. Such amendments shall meet all the relevant requirements of 
Sec. 280.215(j).
    (5) The laboratory shall notify clients promptly, in writing, of 
any event such as the identification of defective measuring or test 
equipment that casts doubt on the validity of results given in any 
calibration certificate, test report or test certificate or amendment 
to a report or certificate.
    (6) The laboratory shall ensure that, where clients require 
transmission of calibration or test results by telephone, telex, 
facsimile or other electronic or electromagnetic means, staff will 
follow documented procedures that ensure that the requirements of this 
Subpart are met and that confidentiality is preserved.
    (l) Subcontracting of calibration or testing. (1) Where a 
laboratory sub-contracts any part of the calibration or testing, this 
work shall be placed with a laboratory accredited under either subparts 
C, D or E of this part for the specific tests being subcontracted. The 
laboratory shall comply with Sec. 280.9, and shall advise the client in 
writing of its intention to subcontract any portion of the testing to 
another party.
    (2) The laboratory shall record and retain details of its 
investigation of the accredited status and testing competence of 
subcontractors and maintain a register of all subcontracting.
    (m) Outside support services and supplies. (1) Where the laboratory 
procures outside services and supplies, other than those referred to 
this Subpart, in support of calibrations or tests, the laboratory shall 
use only those outside support services and supplies that are of 
adequate quality to sustain confidence in the laboratory's calibrations 
or tests.
    (2) Where no independent assurance of the quality of outside 
support services or supplies is available, the laboratory shall have 
procedures to ensure that purchased equipment, materials and services 
comply with specified requirements. The laboratory should, wherever 
possible, ensure that purchased equipment and consumable materials are 
not used until they have been inspected, calibrated or otherwise 
verified as complying with any standard specifications relevant to the 
calibrations or tests concerned.
    (3) The laboratory shall maintain records of all suppliers from 
whom it obtains support services or supplies required for calibrations 
or tests.
    (n) Complaints. (1) The laboratory shall have documented policy and 
procedures for the resolution of complaints received from clients or 
other parties about the laboratory's activities. A record shall be 
maintained of all complaints and of the actions taken by the 
laboratory.
    (2) Where a complaint, or any other circumstance, raises doubt 
concerning the laboratory's compliance with the laboratory's policies 
or procedures, or with the requirements of this section or otherwise 
concerning the quality of the laboratory's calibrations or tests, the 
laboratory shall ensure that those areas of activity and responsibility 
involved are promptly audited in accordance with this section.

Subpart D--NIST Approval of Private Accreditation Programs

Sec. 280.300  Introduction.

    In accordance with section 6(a)(1)(B) of the Act (15 U.S.C. 5405 
(a)(1)(B)), this subpart sets forth the procedures and conditions under 
which private entities may apply for approval by NIST to engage 
directly in the accreditation of laboratories for the testing of 
fasteners under the Act.

Sec. 280.301  Application.

    (a) Application must be made to NIST for approval to accredit 
laboratories for fastener testing under the Act. Upon request, NIST 
will provide application forms and instructions. The applicant shall 
complete the application in English and may provide whatever additional 
enclosures, attachments or exhibits the applicant deems appropriate.
    (b) Application packages may be obtained from: Manager, FQA 
Accreditation Body Evaluation Program, NIST, Bldg. 820, Room 282, 
Gaithersburg, Maryland, 20899. Requests may be made by mail or by FAX 
to: (301) 963-2871.
    (c) The applicant shall reimburse NIST for all costs incurred in 
the evaluation of its accreditation program and subsequent costs 
incurred in ensuring the continued compliance of its program. 
Reimbursement shall be in accordance with the fee schedule established 
by NIST for this purpose.
    (d) An application may be revised by an applicant at any time prior 
to the final decision by NIST. An application may be withdrawn by an 
applicant, without prejudice, at any time prior to the final decision 
by the Director.

Sec. 280.302  Review and decision process.

    (a) Applications submitted by private laboratory accreditation 
bodies will be accepted by NIST and their receipt acknowledged in 
writing. The applications will be reviewed by NIST against the criteria 
specified in this subpart and in subpart F of this part. NIST may 
request additional information as needed from the applicant.
    (b) NIST shall conduct on-site assessments of the facilities of the 
applicant including all of the applicant's organizational units and 
locations covered by the application.
    (c) If the applicant's program is deemed by NIST to have met the 
requirements for approval, the applicant shall be notified by NIST in 
writing. The approval notice shall include the dates when the approval 
begins and the scope of the approval. The approval period shall be for 
as long as the laboratory accreditation body continues to satisfy the 
requirements of Sec. 280.303. As part of maintaining its approved 
status, each laboratory accreditation body shall agree to be reassessed 
by NIST every two years following its initial notice of approval. NIST 
will maintain and make available to the public a list of approved 
fastener accreditation programs.
    (d) If the applicant's program does not meet the requirements for 
approval, the applicant shall be notified in writing, listing the 
specific requirements from this subpart and subpart F of this part 
which the applicant's program has not met. After receipt of such a 
notification, and within the response period provided by NIST, the 
applicant may:
    (1) Submit additional information for further review. Reviewing the 
new submission may involve additional on-site visits by NIST personnel. 
Additional fees may be required. Or,
    (2) Submit a request that the original application be reconsidered, 
including a statement of reasons why the application should have been 
approved.

Sec. 280.303  Criteria for approval.

    An applicant for NIST approval must demonstrate the ability to 
operate an accreditation program consistent with the requirements of 
this subpart and subparts A, B and F of this part.

[[Page 50570]]

Sec. 280.304  Maintaining approved status.

    (a) Approved accreditation bodies shall continue to satisfy all the 
requirements of approval during the approval period.
    (b) Upon request by NIST, approved accreditation bodies shall make 
available to NIST and BXA all records and materials pertaining to the 
program.
    (c) NIST may elect to have its representative participate as an 
observer during on-site visits to testing laboratories seeking 
accreditation by an approved accreditation body.
    (d) Neither the accreditation body, nor any laboratory it accredits 
under the Act and these regulations shall take any action which states 
or implies the approval, or endorsement by NIST or any other agency of 
the U.S. government of the results of tests carried out by such 
laboratories. In addition, neither the accreditation body, nor any 
laboratory it accredits under the Act and these regulations shall take 
any action which states or implies that the accreditation body or its 
accredited laboratories are recognized by NIST in any testing or other 
area(s) beyond those for which NIST has approved the accreditation body 
under this regulation. Approved accreditation bodies shall not engage 
in misrepresentation of the scope or conditions of its approval by 
NIST.

Sec. 280.305  Voluntary termination of approval.

    At any time, an accreditation body may voluntarily terminate its 
program's approval by giving written notice to NIST and to all 
laboratories accredited by that body under its fastener laboratory 
accreditation program. The written notice shall state the date on which 
the termination will take effect.

Sec. 280.306  Involuntary termination of approval by NIST.

    (a) NIST may terminate or suspend its approval of an accreditation 
body if such an action is deemed to be in the public interest.
    (b) Before terminating the approval of an accreditation body, NIST 
will notify the accreditation body in writing, giving it the 
opportunity to rebut or correct the stated reasons for the proposed 
termination. If the problems are not corrected or reconciled within 30 
days, or such longer time as NIST in its sole discretion may grant, the 
termination shall become effective.
    (c) An accreditation body may appeal a termination to the Director 
by submitting a statement of reasons why the approval should not be 
terminated. NIST may, at its discretion, hold in abeyance the 
termination action pending a final decision by the Director. Within 
sixty days following receipt of the appeal, the Director shall inform 
the accreditation body in writing of his or her decision.
    (d) Fastener testing laboratories which have been listed by NIST in 
accordance with subpart B of this part, based on their accreditation by 
an accreditation body whose approval has terminated, shall be removed 
from the list, unless an exception is granted by NIST.

Subpart E--Recognition of Foreign Laboratories

Sec. 280.400  Introduction.

    In accordance with section 6(a)(1)(C) of the Act, this subpart sets 
forth the conditions under which the accreditation of foreign 
laboratories by their governments, by organizations acting on behalf of 
their governments, or by organizations recognized by the Director shall 
be deemed to meet the requirements of the Act.

Sec. 280.401  Recognition of foreign laboratories.

    Foreign entities wishing to be recognized to accredit fastener 
testing laboratories must submit an application for evaluation to NIST. 
NIST recognition is limited to bodies that accredit laboratories 
performing tests on materials or fasteners covered by the Act. To be 
recognized by NIST, accredited foreign laboratories must meet 
conditions set out in subpart C of this part, and applicable laboratory 
accreditation bodies must meet conditions set out in subparts D and F 
of this part.

Subpart F--Requirements for Fastener Laboratory Accreditation 
Bodies

Sec. 280.500  Introduction.

    This subpart sets out organizational, operational and other 
requirements that must be met by all accreditation bodies approved or 
recognized (hereafter ``approved/recognized'') by NIST under subpart D 
or E of this part. This subpart also sets out the requirements against 
which an approved/recognized accreditation body assesses the technical 
competence of an applicant testing laboratory. These requirements 
include conditions with respect to subpart C of this part.

Sec. 280.501  Accreditation bodies.

    (a) General provisions. (1) The procedures under which an approved/
recognized accreditation body operates shall be administered in a non-
discriminatory manner. Access to an accreditation system operated by an 
approved/recognized accreditation body shall not be conditional upon 
the size of the laboratory or membership in any association or group, 
nor shall there be undue financial conditions to restrict 
participation.
    (2) The competence of an applicant laboratory shall be assessed by 
an approved/recognized accreditation body against requirements 
consistent with the conditions set out in subpart C of this part.
    (3) The requirements of Sec. 280.501(a)(2) may have to be 
interpreted for a specific test or type of test by an approved/
recognized accreditation body. These interpretations shall be 
formulated by relevant and impartial committees or persons possessing 
the necessary technical competence. They shall be published by the 
accreditation body.
    (4) An approved/recognized accreditation body shall require 
accredited laboratories to maintain impartiality and integrity.
    (5) An approved/recognized accreditation body shall confine its 
requirements, assessment and decision on accreditation to those matters 
specifically related to the scope of the accreditation being 
considered.
    (b) Organization of an approved/recognized accreditation body
    (1) An approved/recognized accreditation body shall:
    (i) Be a legally identifiable, public or private entity;
    (ii) Have rights and responsibilities relevant to its accreditation 
activities;
    (iii) Have adequate arrangements to cover liabilities arising from 
its operations and/or activities;
    (iv) Have the financial stability and resources required for the 
operation of an accreditation system;
    (v) Have and make available on request a description of the means 
by which it receives its financial support;
    (vi) Employ a sufficient number of personnel having the necessary 
education, training, technical knowledge and experience for handling 
the type, range and volume of work performed, under a senior executive 
who is responsible to the organization, body or board to which it 
reports;
    (vii) Have a quality system including an organizational structure, 
that enables it to give confidence in its ability to operate a 
laboratory accreditation system satisfactorily;
    (viii) Have documented policies and procedures for the operation of 
the quality system that include:
    (A) Policies and decision-making procedures that distinguish 
between laboratory accreditation and any other activities in which the 
body is engaged;
    (B) Policies and procedures for the resolution of complaints and 
appeals

[[Page 50571]]

received from laboratories about the handling of accreditation matters, 
or from users of services about accredited laboratories or any other 
matters;
    (ix) Together with its senior executive, and staff, be free from 
any commercial, financial and other pressures which might influence the 
results of the accreditation process;
    (x) Have formal rules and structures for the appointment and 
operation of committees involved in the accreditation process; such 
committees shall be free from any commercial, financial and other 
pressures that might influence decisions or shall have a structure 
where members are chosen to provide impartiality through a balance of 
interest where no single interest predominates;
    (xi) Establish one or more technical committees, each responsible, 
within its scope, for advising the accreditation body on the technical 
matters relating to the operation of its accreditation system;
    (xii) Not offer consultancies or other services which may 
compromise the objectivity of its accreditation process and decisions;
    (xiii) Have arrangements that are consistent with applicable laws, 
to safeguard, at all levels of its organization (including committees), 
confidentiality of the information obtained relating to applications, 
assessment and accreditation of laboratories;
    (2) An approved/recognized accreditation body shall have 
arrangements for either controlling the ownership, use and display of 
the accreditation documents or controlling the manner in which an 
accredited laboratory may refer to its accredited status, or both.
    (c) Quality system. (1) An approved/recognized accreditation body 
shall operate a quality system appropriate to the type, range and 
volume of work performed. This system shall be documented and the 
documentation shall be available for use by the accreditation body 
staff. The accreditation body shall designate a person having direct 
access to its highest executive level, to take responsibility for the 
quality system and the maintenance of the quality documentation.
    (2) The quality system shall be documented in a quality manual and 
associated quality procedures, and the quality manual shall contain or 
refer to at least the following;
    (i) A quality policy statement;
    (ii) The organizational structure of the accreditation body;
    (iii) The operational and functional duties and services pertaining 
to quality, so that each person concerned will know the extent and the 
limits of their responsibility;
    (iv) Administrative procedures including document control;
    (v) Policies and procedures to implement the accreditation process;
    (vi) Arrangements for feedback and corrective actions whenever 
discrepancies are detected;
    (vii) The policy and procedures for dealing with appeals, 
complaints and disputes;
    (viii) The policy and procedures for conducting internal audits;
    (ix) The policy and the procedures for conducting quality system 
reviews;
    (x) The policy and the procedures for the recruitment and training 
of assessors and monitoring their performance.
    (3) An approved/recognized accreditation body shall audit its 
activities to verify that they comply with the requirements of the 
quality system. The quality system shall also be reviewed to ensure its 
continued effectiveness. Audits and reviews shall be carried out 
systematically and periodically and recorded together with details of 
any corrective actions taken.
    (4) An approved/recognized accreditation body shall maintain 
records to demonstrate that accreditation procedures have been 
effectively fulfilled, particularly with respect to application forms, 
assessment reports, and reports relating to granting, maintaining, 
extending, suspending or withdrawing accreditation. These accreditation 
documents shall form part of the record.
    (5) An approved/recognized accreditation body shall have a policy 
and procedures for retaining records. The records shall be retained for 
a period of at least 5 years, and shall be available to NIST personnel 
and other persons considered by the accreditation body to have a right 
of access to these records.
    (d) Granting, maintaining, extending, suspending, and withdrawing 
accreditation. (1) An approved/recognized accreditation body shall 
specify the conditions for granting, maintaining and extending 
accreditation and the conditions under which accreditation may be 
suspended or withdrawn, partially or in total for all or part of the 
laboratory's scope of accreditation.
    (2) An approved/recognized accreditation body shall have 
arrangements to grant, maintain, suspend or withdraw accreditation, 
increase or reduce the scope of accreditation or require reassessment, 
in the event of changes affecting the laboratory's activity and 
operation, such as changes in personnel or equipment, or if analysis of 
a complaint or any other information indicates that the laboratory no 
longer complies with the requirements of the accreditation body.
    (3) An approved/recognized accreditation body shall have 
arrangements relating to the transfer of accreditation when the legal 
status (e.g. ownership) of the accredited laboratory changes.
    (e) Documentation. An approved/recognized accreditation body shall 
provide (through publications, electronic media or other means), update 
at adequate intervals, and make available on request:
    (1) Information about the authority under which accreditation 
systems operated by the accreditation body were established and 
specifying whether they are mandatory or voluntary;
    (2) A document containing its requirements for accreditation in 
accordance with this document;
    (3) A document stating the arrangements for granting, maintaining, 
extending, suspending and withdrawing accreditation;
    (4) Information about the assessment and accreditation process;
    (5) General information on the fees charged to applicant and 
accredited laboratories;
    (6) A description of the rights and duties of accredited 
laboratories as specified in Sec. 280.504 of this part, including 
requirements, restrictions or limitations on the use of the accrediting 
body's logo and on the ways of referring to the accreditation granted.

Sec. 280.502  Laboratory assessors.

    (a) Requirements for assessors. The assessor or assessment team 
appointed to assess a laboratory shall:
    (1) Be familiar with the relevant legal regulations, accreditation 
procedures and accreditation requirements;
    (2) Have a thorough knowledge of the relevant assessment method and 
assessment documents;
    (3) Have appropriate technical knowledge of the specific tests or 
types of tests for which accreditation is sought and, where relevant, 
with the associated sampling procedures;
    (4) Be able to communicate effectively, both in writing and orally;
    (5) Be free of any commercial, financial or other pressures or 
conflicts of interest that might cause assessor(s) to act in other than 
an impartial or non-discriminatory manner;
    (6) Not have offered consultancies to laboratories which might 
compromise their impartiality in the accreditation process and 
decisions.
    (b) Qualification procedures for assessors. An approved/recognized

[[Page 50572]]

accreditation body shall have an adequate procedure for:
    (1) Qualifying assessors, comprising an assessment of their 
competence and training, and attendance at one or more actual 
assessments with a qualified assessor, and
    (2) Monitoring the performance of assessors.
    (c) Contracting of assessors. An approved/recognized accreditation 
body shall require the assessors to sign a contract or other document 
by which they commit themselves to comply with the rules defined by the 
accreditation body, including those relating to confidentiality and 
those relating to independence from commercial and other interests, and 
any prior association with laboratories to be assessed.
    (d) Assessor records. An approved/recognized accreditation body 
shall possess and maintain up-to-date records on assessors consisting 
of:
    (1) Name and address;
    (2) Organization affiliation and position held;
    (3) Educational qualification and professional status;
    (4) Work experience;
    (5) Training in quality assurance, assessment and calibration and 
testing;
    (6) Experience in laboratory assessment, together with field of 
competence;
    (7) Date of most recent updating of record.
    (e) Procedures for assessors. Assessors shall be provided with an 
up-to-date set of procedures giving assessment instructions and all 
relevant information on accreditation arrangements.

Sec. 280.503  Accreditation process.

    (a) Application for accreditation. (1) A detailed description of 
the assessment and accreditation procedure, the documents containing 
the requirements for accreditation and documents describing the rights 
and duties of accredited laboratories (including fees to be paid by 
applicant and accredited laboratories) shall be maintained up-to-date 
and given to applicant laboratories.
    (2) Additional relevant information shall be provided to applicant 
laboratories on request.
    (3) A duly authorized representative of the applicant laboratory 
shall be required to sign an official application form, in which or 
attached to which
    (i) The scope of the desired accreditation is clearly defined;
    (ii) The applicant's representative agrees to fulfill the 
accreditation procedure, especially to receive the assessment team, to 
pay the fees charged to the applicant laboratory whatever the result of 
the assessment may be, and to accept the charges of subsequent 
maintenance of the accreditation of the laboratory;
    (iii) the applicant agrees to comply with the requirements for 
accreditation and to supply any information needed for the evaluation 
of the laboratory.
    (4)(i) The following minimum information shall be provided by the 
applicant laboratory prior to the on-site assessment:
    (A) The general features of the applicant laboratory (corporate 
entity: Name, address, legal status, human and technical resources);
    (B) General information concerning the laboratory covered by the 
application, such as primary function, relationship in a larger 
corporate entity and, If applicable, physical location of laboratories 
involved;
    (C) A definition of the materials or products tested, the methods 
used and the tests performed;
    (D) A copy of the laboratory's quality manual and, where required, 
the associated documentation.
    (ii) The information gathered shall be used for the preparation of 
on-site assessment and shall be treated with appropriate 
confidentiality.
    (b) Assessment. (1) An approved/recognized accreditation body shall 
appoint qualified assessor(s) to evaluate all material collected from 
the applicant and to conduct the assessment on its behalf at the 
laboratory and any other sites where activities to be covered by the 
accreditation are performed.
    (2) To ensure that a comprehensive and correct assessment is 
carried out, each assessor shall be provided with the appropriate 
working documents.
    (3) The date of assessment shall be mutually agreed with the 
applicant laboratory. The latter shall be informed of the name(s) of 
the qualified assessor(s) nominated to carry out the assessment, with 
sufficient notice so that the laboratory is given an opportunity to 
appeal against the appointment of any particular assessor.
    (4) The assessor(s) shall be formally appointed. A lead assessor 
shall be appointed, if relevant. The mandate given to the assessor(s) 
shall be clearly defined and made known to the applicant laboratory.
    (c) Sub-contracting of assessment. (1) If an approved/recognized 
accreditation body decides to delegate fully or partially the 
assessment of a laboratory to another body, then the accreditation body 
shall take full responsibility for such an assessment made on its 
behalf.
    (2) An approved/recognized accreditation body shall ensure that the 
party to which assessment has been delegated is approved/recognized by 
NIST.
    (d) Assessment report. (1) An approved/recognized accreditation 
body may adopt reporting procedures that suit its needs but as a 
minimum these procedures shall ensure that:
    (i) A meeting takes place between the assessor or assessment team 
and the laboratory management prior to leaving the laboratory at which 
the assessment team provides a written or oral report on the compliance 
of the applicant laboratory with the accreditation requirements;
    (ii) The assessor or assessment team provides the accreditation 
body with a detailed assessment report containing all relevant 
information concerning the ability of the applicant laboratory to 
comply with all of the accreditation requirements, including any which 
may come about from the results of proficiency testing;
    (iii) A report on the outcome of the assessment is promptly brought 
to the applicant laboratory's notice by the accreditation body, 
identifying any non-compliances that have to be discharged in order to 
comply with all of the accreditation requirements. The laboratory shall 
be invited to present its comments on this report and to describe the 
specific actions taken, or planned to be taken within a defined time, 
to remedy any non-compliances with the accreditation requirements 
identified during the assessment.
    (2) The final report authorized by an approved/recognized 
accreditation body and submitted to the laboratory, if it is different, 
shall include as a minimum:
    (i) Date(s) of assessment(s);
    (ii) The names of the person(s) responsible for the report;
    (iii) The names and addresses of all the laboratory sites assessed;
    (iv) The assessed scope of accreditation or reference thereto;
    (v) comments of the assessor(s) or assessment team on the 
compliance of the applicant laboratory with the accreditation 
requirements.
    (3) The reports shall take into consideration:
    (i) The technical qualification, experience and authority of the 
staff encountered, especially the persons responsible for the technical 
validity of test reports or test certificates;
    (ii) The adequacy of the internal organization and procedures 
adopted by the applicant laboratory to give confidence in the quality 
of its services, the physical facilities, i.e., the environment and the 
calibration/test equipment of the laboratory including maintenance and 
calibration having

[[Page 50573]]

regard to the volume of work undertaken;
    (iii) Proficiency testing or other interlaboratory comparison 
performed by the applicant laboratory, the results of this proficiency 
testing, and the use of these results by the laboratory;
    (iv) The actions taken to correct any non-compliances identified at 
previous assessments.
    (e) Decision on accreditation. (1) The decision whether or not to 
accredit a laboratory shall be taken by an approved/recognized 
accreditation body on the basis of the information gathered during the 
accreditation process.
    (2) An approved/recognized accreditation body shall not delegate 
its responsibility for granting, maintaining, extending, suspending or 
withdrawing accreditation.
    (f) Granting accreditation. (1) An approved/recognized 
accreditation body shall transmit to each accredited laboratory formal 
accreditation documents such as a letter or a certificate signed by an 
officer who has been assigned such responsibility. These formal 
accreditation documents shall permit identification of--
    (i) The name and address of the laboratory that has been 
accredited;
    (ii) The scope of the accreditation including:
    (A) The tests or types of test for which accreditation has been 
granted;
    (B) For tests, the materials or products tested, the methods used 
and the tests performed;
    (C) For specific tests for which accreditation has been granted the 
methods used defined by written standards or reference documents that 
have been accepted by the accreditation body.
    (iii) Where appropriate, the persons recognized by the 
accreditation body as being responsible for the test certificates or 
the test reports;
    (iv) The term of accreditation which shall be valid for a period 
not to exceed three years;
    (v) The accredited laboratory by a unique number.
    (2) An approved/recognized accreditation body shall furnish 
notification to NIST required by Subpart B of this part.
    (g) Surveillance and reassessment of accredited laboratories. (1) 
An approved/recognized accreditation body shall have an established 
documented program consistent with the accreditation granted for 
carrying out periodic surveillance and reassessment at sufficiently 
close intervals to ensure that its accredited laboratories continue to 
comply with the accreditation requirements.
    (2) Surveillance and reassessment procedures shall be consistent 
with those concerning the assessment of laboratories as described in 
this Subpart.
    (h) Proficiency testing. (1) The approved/recognized accreditation 
body shall require each fastener testing laboratory it accredits, and 
each laboratory which has applied to it for accreditation to 
participate in proficiency testing comparable to that conducted under 
Subpart C of this part by NVLAP.
    (2) Although an accreditation shall not be granted or maintained 
only on the basis of the results of proficiency testing, accreditation 
shall not be granted or maintained if required proficiency testing 
participation is unsatisfactory.
    (i) Certificates or reports issued by accredited laboratories. (1) 
An approved/recognized accreditation body shall normally allow an 
accredited laboratory to refer to its accreditation in test reports and 
test certificates that contain only the results of tests or types of 
test for which accreditation is held.
    (2) An approved/recognized accreditation body shall have a policy 
that defines the circumstances in which accredited laboratories are 
permitted to include in test reports or test certificates, the results 
of tests for which accreditation is not held and the results of sub-
contracted tests.

Sec. 280.504  Relationship between approved/recognized accreditation 
body and laboratory.

    (a) An approved/recognized accreditation body shall have 
arrangements to ensure that the laboratory and its representatives 
afford such accommodation and co-operation as is necessary, to enable 
the accreditation body to verify compliance with the requirements for 
accreditation. These arrangements shall include provision for 
examination of documentation and access to all testing areas, records 
and personnel for the purposes of assessment, surveillance, 
reassessment and resolution of complaints.
    (b) An approved/recognized accreditation body shall require that an 
accredited laboratory--
    (1) At all times complies with the relevant provisions of these 
regulations;
    (2) Claims that it is accredited only in respect of services for 
which it has been granted accreditation and which are carried out in 
accordance with these conditions;
    (3) Pays such fees as shall be determined by the accreditation 
body;
    (4) Does not use its accreditation in such a manner as to bring the 
accreditation body into disrepute and does not make any statement 
relevant to its accreditation which the accreditation body may consider 
misleading or unauthorized;
    (5) Upon suspension or withdrawal of its accreditation (however 
determined) forthwith discontinues its use of all advertising matter 
that contains any reference thereto and return any certificates of 
accreditation to the accreditation body;
    (6) Does not use its accreditation to state or imply any product 
approval by the accreditation body or any agency of the United States 
Government;
    (7) Endeavors to ensure that no certificate or report nor any part 
thereof is used in a misleading manner;
    (8) In making reference to its accreditation status in 
communication media such as advertising, brochures or other documents, 
complies with the requirements of the accreditation body.
    (c) Notification of change. (1) An approved/recognized 
accreditation body shall have arrangements to ensure that an accredited 
laboratory informs it without delay of changes in any aspect of the 
laboratory's status or operation that affects the laboratory's:
    (i) Legal, commercial or organizational status;
    (ii) Organization and management, e.g., key managerial staff;
    (iii) Policies or procedures, where appropriate;
    (iv) Premises;
    (v) Personnel, equipment, facilities, working environment or other 
resources, where significant;
    (vi) Authorized signatories;
    (vii) Or other such matters that may affect the laboratory's 
capability, or scope of accredited activities, or compliance with the 
requirements in this document or any other relevant criteria of 
competence specified by the accreditation body.
    (2) Upon receipt of due notice of any intended changes relating to 
the requirements of this document, the relevant criteria of competence 
and any other requirements prescribed by the accreditation body, the 
accreditation body shall ensure that the laboratory carries out the 
necessary adjustments to its procedures within such time, as in the 
opinion of the body is reasonable. The laboratory shall notify the body 
when such adjustments have been made.
    (d) Directory of accredited laboratories. An approved/recognized 
accreditation body shall produce periodically but at least annually a

[[Page 50574]]

directory of accredited laboratories describing the accreditation 
granted.

Subpart G--Enforcement

 Sec. 280.600  Scope.

    Section 280.601 of this part lists definitions used in this part. 
Section 280.602 of this part specifies that failure to take any action 
required by or taking any action prohibited by this part constitutes a 
violation of this part. Section 280.603 describes the penalties that 
may be imposed for violations of this part. Sections 280.605 through 
280.623 establish the procedures for imposing administrative penalties 
for violations of this part.

Sec. 280.601  Definitions used in this subpart.

    The definitions in this Sec. 280.601 apply to this part.
    Administrative law judge (ALJ). The person authorized to conduct 
hearings in administrative enforcement proceedings brought under the 
Act.
    Assistant Secretary. The Assistant Secretary for Export 
Enforcement, Bureau of Export Administration.
    Department. The United States Department of Commerce, specifically, 
the Bureau of Export Administration, NIST and the Patent and Trademark 
Office.
    Final decision. A decision or order assessing a civil penalty or 
otherwise disposing of or dismissing a case, which is not subject to 
further review under this part, but which is subject to collection 
proceedings or judicial review in an appropriate Federal district court 
as authorized by law.
    Initial decision. A decision of the administrative law judge which 
is subject to review by the Under Secretary for Export Administration, 
but which becomes the final decision of the Department in the absence 
of such an appeal.
    Party. The Department and any person named as a respondent under 
this part.
    Respondent. Any person named as the subject of a charging letter, 
proposed charging letter, or other order proposed or issued under this 
part.
    Under Secretary. The Under Secretary for Export Administration, 
United States Department of Commerce.

Sec. 280.602  Violations.

    (a) Engaging in prohibited conduct. No person may engage in any 
conduct prohibited by or contrary to, or refrain from engaging in any 
action required by the Act, this part, or any order issued thereunder.
    (b) Causing, aiding, or abetting a violation. No person may cause 
or aid, abet, counsel, command, induce, procure, or permit the doing of 
any act prohibited, or the omission of any act required, by the Act, 
this part, or any order issued thereunder.
    (c) Solicitation and attempt. No person may solicit or attempt a 
violation of the Act, this part, or any order issued thereunder.
    (d) Conspiracy. No person may conspire or act in concert with one 
or more persons in any manner or for any purpose to bring about or to 
do any act that constitutes a violation of the Act, this part, or any 
order issued thereunder.
    (e) Misrepresentation and concealment of facts. No person may make 
any false or misleading representation, statement, or certification, or 
falsify or conceal any material fact, either directly to NIST, or the 
Bureau of Export Administration, the Patent and Trademark Office, or 
any official of any other United States agency, or indirectly through 
any other person:
    (1) In the course of an investigation or other action subject to 
the Act and this part; or
    (2) In connection with the preparation, submission, issuance, use, 
maintenance of a laboratory test report, certificate of conformance as 
described in Secs. 280.5 and 280.6 of this part; or
    (3) In connection with any application for laboratory accreditation 
as described in Sec. 280.205 of this part; or
    (4) In connection with an application to be an accreditation body 
as described in Sec. 280.301 of this part.
    (f) Falsification of test report. No person shall falsify or make 
any false or misleading statement on or in connection with a laboratory 
test report required by section 5(c) of the Act or Sec. 280.6 of this 
part.
    (g) Falsification of certificate of conformance. No person shall 
falsify or make any false or misleading statement on or in connection 
with a certificate of conformance required by Sec. 280.5 of this part.
    (h) Falsification of documents relating to laboratory accreditation 
or accreditation bodies. No person shall falsify or make any false or 
misleading statement on or in connection with any document relating to 
laboratory accreditation or approval or recognition of accreditation 
bodies as required by sections 6(a) or 6(b) of the Act or this part.
    (i) Use of another person's recorded insignia. No person may apply 
an insignia to a fastener if the Commissioner has issued a certificate 
of recordal (as described in Sec. 280.712 of this part) for that 
insignia to another person without written permission from the person 
to whom the certificate was issued.
    (j) False claim of laboratory accreditation or accreditation body. 
No person shall falsely claim to be an accredited laboratory or 
approved or recognized accreditation body as described in section 6 of 
the Act or subparts B, C, D, and E of this part.

Sec. 280.603  Penalties, remedies and sanctions.

    (a) Civil remedies. The Attorney General may bring an action in an 
appropriate United States district court for declaratory and injunctive 
relief against any person who violates the Act or any regulation issued 
thereunder. Such action may not be brought more than 10 years after the 
cause of action accrues.
    (b) Civil penalties. Any person who is determined, after notice and 
opportunity for a hearing, to have violated the Act or any regulation 
issued thereunder shall be liable to the United States for a civil 
penalty of not more than $25,000 for each violation.
    (c) Criminal penalties. (1) Whoever knowingly certifies, marks, 
offers for sale, or sells a fastener in violation of the Act or a 
regulation issued thereunder shall be fined under title 18, United 
States Code, or imprisoned not more than 5 years, or both.
    (2) Whoever intentionally fails to maintain records relating to a 
fastener in violation of the Act or a regulation issued thereunder 
shall be fined under title 18, United States Code, or imprisoned not 
more than five years or both.
    (3) Whoever negligently fails to maintain records relating to a 
fastener in violation of the Act or a regulation issued thereunder 
shall be fined under title 18, United States Code, or imprisoned not 
more than two years or both.

Sec. 280.604  Administrative enforcement proceedings.

    Sections 280.605 through 280.623 set forth the procedures for 
imposing administrative penalties for violations of the Act and 
Fastener Quality Regulations (FQR).

Sec. 280.605  Institution of administrative enforcement proceedings.

    (a) Charging letters. The Director of the Office of Export 
Enforcement (OEE) may begin administrative enforcement proceedings 
under this part by issuing a charging letter. The charging letter shall 
constitute the formal complaint and will state that there is reason to 
believe that a violation of this part has occurred. It will set forth 
the essential

[[Page 50575]]

facts about each alleged violation, refer to the specific regulatory or 
other provisions involved, and give notice of the sanctions available 
under the Act and this part. The charging letter will inform the 
respondent that failure to answer the charges as provided in 
Sec. 280.608 of this part will be treated as a default under 
Sec. 280.609 of this part, that the respondent is entitled to a hearing 
if a written demand for one is requested with the answer, and that the 
respondent may be represented by counsel, or by other authorized 
representative. A copy of the charging letter shall be filed with the 
administrative law judge, which filing shall toll the running of the 
applicable statute of limitations. Charging letters may be amended or 
supplemented at any time before an answer is filed, or, with permission 
of the administrative law judge, afterwards. The Department may 
unilaterally withdraw charging letters at any time, by notifying the 
respondent and the administrative law judge.
    (b) Notice of issuance of charging letter instituting 
administrative enforcement proceeding. A respondent shall be notified 
of the issuance of a charging letter, or any amendment or supplement 
thereto:
    (1) By mailing a copy by registered or certified mail addressed to 
the respondent at the respondent's last known address;
    (2) By leaving a copy with the respondent or with an officer, a 
managing or general agent, or any other agent authorized by appointment 
or by law to receive service of process for the respondent; or
    (3) By leaving a copy with a person of suitable age and discretion 
who resides at the respondent's last known dwelling.
    (4) Delivery of a copy of the charging letter, if made in the 
manner described in paragraph (b)(2) or (3) of this section, shall be 
evidenced by a certificate of service signed by the person making such 
service, stating the method of service and the identity of the person 
with whom the charging letter was left. The certificate of service 
shall be filed with the administrative law judge.
    (c) Date. The date of service of notice of the issuance of a 
charging letter instituting an administrative enforcement proceeding, 
or service of notice of the issuance of a supplement or amendment to a 
charging letter, is the date of its delivery, or of its attempted 
delivery if delivery is refused.

Sec. 280.606  Representation.

    A respondent individual may appear and participate in person, a 
corporation by a duly authorized officer or employee, and a partnership 
by a partner. If a respondent is represented by counsel, counsel shall 
be a member in good standing of the bar of any State, Commonwealth or 
Territory of the United States, or of the District of Columbia, or be 
licensed to practice law in the country in which counsel resides if not 
the United States. A respondent personally, or through counsel or other 
representative who has the power of attorney to represent the 
respondent, shall file a notice of appearance with the administrative 
law judge. The Department will be represented by the Office of Chief 
Counsel for Export Administration, U.S. Department of Commerce.

Sec. 280.607  Filing and service of papers other than charging letter.

    (a) Filing. All papers to be filed shall be addressed to ``FQA 
Administrative Enforcement Proceedings,'' at the address set forth in 
the charging letter, or such other place as the administrative law 
judge may designate. Filing by United States mail, first class postage 
prepaid, by express or equivalent parcel delivery service, or by hand 
delivery, is acceptable. Filing by mail from a foreign country shall be 
by airmail. In addition, the administrative law judge may authorize 
filing of papers by facsimile or other electronic means, provided that 
a hard copy of any such paper is subsequently filed. A copy of each 
paper filed shall be simultaneously served on each party.
    (b) Service. Service shall be made by personal delivery or by 
mailing one copy of each paper to each party in the proceeding. Service 
by delivery service or facsimile, in the manner set forth in paragraph 
(a) of this section, is acceptable. Service on the Department shall be 
addressed to the Chief Counsel for Export Administration, Room H-3839, 
U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., 
Washington, DC. 20230. Service on a respondent shall be to the address 
to which the charging letter was sent or to such other address as 
respondent may provide. When a party has appeared by counsel or other 
representative, service on counsel or other representative shall 
constitute service on that party.
    (c) Date. The date of filing or service is the day when the papers 
are deposited in the mail or are delivered in person, by delivery 
service, or by facsimile.
    (d) Certificate of service. A certificate of service signed by the 
party making service, stating the date and manner of service, shall 
accompany every paper, other than the charging letter, filed and served 
on parties.
    (e) Computing period of time. In computing any period of time 
prescribed or allowed by this part or by order of the administrative 
law judge or the Under Secretary, the day of the act, event, or default 
from which the designated period of time begins to run is not to be 
included. The last day of the period so computed is to be included 
unless it is a Saturday, a Sunday, or a legal holiday (as defined in 
Rule 6(a) of the Federal Rules of Civil Procedure), in which case the 
period runs until the end of the next day which is neither a Saturday, 
a Sunday, nor a legal holiday. Intermediate Saturdays, Sundays, and 
legal holidays are excluded from the computation when the period of 
time prescribed or allowed is seven days or less.

Sec. 280.608  Answer and demand for hearing.

    (a) When to answer. The respondent must answer the charging letter 
within 30 days after being served with notice of the issuance of a 
charging letter instituting an administrative enforcement proceeding, 
or within 30 days of notice of any supplement or amendment to a 
charging letter, unless time is extended under Sec. 280.618 of this 
part.
    (b) Contents of answer. The answer must be responsive to the 
charging letter and must fully set forth the nature of the respondent's 
defense or defenses. The answer must admit or deny specifically each 
separate allegation of the charging letter; if the respondent is 
without knowledge, the answer must so state and will operate as a 
denial. Failure to deny or controvert a particular allegation will be 
deemed an admission of that allegation. The answer must also set forth 
any additional or new matter the respondent believes supports a defense 
or claim of mitigation. Any defense or partial defense not specifically 
set forth in the answer shall be deemed waived, and evidence thereon 
may be refused, except for good cause shown.
    (c) Demand for hearing. If the respondent desires a hearing, a 
written demand for one must be submitted with the answer. Any demand by 
the Department for a hearing must be filed with the administrative law 
judge within 30 days after service of the answer. Failure to make a 
timely written demand for a hearing shall be deemed a waiver of the 
party's right to a hearing, except for good cause shown. If no party 
demands a hearing, the matter will go forward in accordance with the 
procedures set forth in Sec. 280.617 of this part.

[[Page 50576]]

    (d) English language required. The answer, all other papers, and 
all documentary evidence must be submitted in English, or translations 
into English must be filed and served at the same time.

Sec. 280.609  Default.

    (a) General. Failure of the respondent to file an answer within the 
time provided constitutes a waiver of the respondent's right to appear 
and contest the allegations in the charging letter. In such event, the 
administrative law judge, on the Department's motion and without 
further notice to the respondent, shall find the facts to be as alleged 
in the charging letter and render an initial decision containing 
findings of fact and appropriate conclusions of law and issue an 
initial decision and order imposing appropriate sanctions. The decision 
and order may be appealed to the Under Secretary in accordance with the 
applicable procedures set forth in Sec. 280.623 of this part.
    (b) Petition to set aside default.--(1) Procedure. Upon petition 
filed by a respondent against whom a default order has been issued, 
which petition is accompanied by an answer meeting the requirements of 
280.608(b) of this part, the Under Secretary may, after giving all 
parties an opportunity to comment, and for good cause shown, set aside 
the default and vacate the order entered thereon and remand the matter 
to the administrative law judge for further proceedings.
    (2) Time limits. A petition under this section must be made within 
one year of the date of entry of the order which the petition seeks to 
have vacated.

Sec. 280.610  Summary decision.

    At any time after a proceeding has been initiated, a party may move 
for a summary decision disposing of some or all of the issues. The 
administrative law judge may render an initial decision and issue an 
order if the entire record shows, as to the issue(s) under 
consideration:
    (a) That there is no genuine issue as to any material fact; and
    (b) That the moving party is entitled to a summary decision as a 
matter of law.

Sec. 280.611  Discovery.

    (a) General. The parties are encouraged to engage in voluntary 
discovery regarding any matter, not privileged, which is relevant to 
the subject matter of the pending proceeding. The provisions of the 
Federal Rules of Civil Procedure relating to discovery apply to the 
extent consistent with this part and except as otherwise provided by 
the administrative law judge or by waiver or agreement of the parties. 
The administrative law judge may make any order which justice requires 
to protect a party or person from annoyance, embarrassment, oppression, 
or undue burden or expense. These orders may include limitations on the 
scope, method, time and place of discovery, and provisions for 
protecting the confidentiality of classified or otherwise sensitive 
information.
    (b) Interrogatories and requests for admission or production of 
documents. A party may serve on any party interrogatories, requests for 
admission, or requests for production of documents for inspection and 
copying, and a party concerned may apply to the administrative law 
judge for such enforcement or protective order as that party deems 
warranted with respect to such discovery. The service of a discovery 
request shall be made at least 20 days before the scheduled date of the 
hearing unless the administrative law judge specifies a shorter time 
period. Copies of interrogatories, requests for admission and requests 
for production of documents and responses thereto shall be served on 
all parties, and a copy of the certificate of service shall be filed 
with the administrative law judge. Matters of fact or law of which 
admission is requested shall be deemed admitted unless, within a period 
designated in the request (at least 10 days after service, or within 
such additional time as the administrative law judge may allow), the 
party to whom the request is directed serves upon the requesting party 
a sworn statement either denying specifically the matters of which 
admission is requested or setting forth in detail the reasons why the 
party to whom the request is directed cannot truthfully either admit or 
deny such matters.
    (c) Depositions. Upon application of a party and for good cause 
shown, the administrative law judge may order the taking of the 
testimony of any person by deposition and the production of specified 
documents or materials by the person at the deposition. The application 
shall state the purpose of the deposition and set forth the facts 
sought to be established through the deposition.
    (d) Enforcement. The administrative law judge may order a party to 
answer designated questions, to produce specified documents or things 
or to take any other action in response to a proper discovery request. 
If a party does not comply with such an order, the administrative law 
judge may make a determination or enter any order in the proceeding as 
the ALJ deems reasonable and appropriate. The ALJ may strike related 
charges or defenses in whole or in part or may take particular facts 
relating to the discovery request to which the party failed or refused 
to respond as being established for purposes of the proceeding in 
accordance with the contentions of the party seeking discovery. In 
addition, enforcement by a district court of the United States may be 
sought under section 9(b)(6) of the Act.

Sec. 280.612  Subpoenas.

    (a) Issuance. Upon the application of any party, supported by a 
satisfactory showing that there is substantial reason to believe that 
the evidence would not otherwise be available, the administrative law 
judge may issue subpoenas requiring the attendance and testimony of 
witnesses and the production of such books, records or other 
documentary or physical evidence for the purpose of the hearing, as the 
ALJ deems relevant and material to the proceedings, and reasonable in 
scope. Witnesses summoned shall be paid the same fees and mileage that 
are paid to witnesses in the courts of the United States. In case of 
contempt or refusal to obey a subpoena served upon any person pursuant 
to this paragraph, the district court of the United States for any 
district in which such person is found, resides, or transacts business, 
upon application by the United States and after notice to such person, 
shall have jurisdiction to issue an order requiring such person to 
appear and give testimony before the administrative law judge or to 
appear and produce documents before the administrative law judge, or 
both, and any failure to obey such order of the court may be punished 
by such court as contempt thereof.
    (b) Service. Subpoenas issued by the administrative law judge may 
be served in any of the methods set forth in Sec. 280.607(b) of this 
part.
    (c) Timing. Applications for subpoenas must be submitted at least 
10 days before the scheduled hearing or deposition, unless the 
administrative law judge determines, for good cause shown, that 
extraordinary circumstances warrant a shorter time.

Sec. 280.613  Matter protected against disclosure.

    (a) Protective measures. The administrative law judge may limit 
discovery or introduction of evidence or issue such protective or other 
orders as in the ALJ's judgment may be needed to prevent undue 
disclosure of classified or sensitive documents or information.

[[Page 50577]]

Where the administrative law judge determines that documents containing 
the classified or sensitive matter need to be made available to a party 
to avoid prejudice, the ALJ may direct that an unclassified and/or 
nonsensitive summary or extract of the documents be prepared. The 
administrative law judge may compare the extract or summary with the 
original to ensure that it is supported by the source document and that 
it omits only so much as must remain undisclosed. The summary or 
extract may be admitted as evidence in the record.
    (b) Arrangements for access. If the administrative law judge 
determines that this procedure is unsatisfactory and that classified or 
otherwise sensitive matter must form part of the record in order to 
avoid prejudice to a party, the administrative law judge may provide 
the parties an opportunity to make arrangements that permit a party or 
a representative to have access to such matter without compromising 
sensitive information. Such arrangements may include obtaining security 
clearances or giving counsel for a party access to sensitive 
information and documents subject to assurances against further 
disclosure, including a protective order, if necessary.

Sec. 280.614  Prehearing conference.

    (a) The administrative law judge, on his or her own motion or on 
request of a party, may direct the parties to participate in a 
prehearing conference, either in person or by telephone, to consider:
    (1) Simplification of issues;
    (2) The necessity or desirability of amendments to pleadings;
    (3) Obtaining stipulations of fact and of documents to avoid 
unnecessary proof; or
    (4) Such other matters as may expedite the disposition of the 
proceedings.
    (b) The administrative law judge may order the conference 
proceedings to be recorded electronically or taken by a reporter, 
transcribed and filed with the ALJ.
    (c) If a prehearing conference is impracticable, the administrative 
law judge may direct the parties to correspond with the ALJ to achieve 
the purposes of such a conference.
    (d) The administrative law judge will prepare a summary of any 
actions agreed on or taken pursuant to this section. The summary will 
include any written stipulations or agreements made by the parties.

Sec. 280.615  Hearings.

    (a) Scheduling. The administrative law judge, by agreement with the 
parties or upon notice to all parties of not less than 30 days, will 
schedule a hearing. All hearings will be held in Washington, DC., 
unless the administrative law judge determines, for good cause shown, 
that another location would better serve the interests of justice.
    (b) Hearing procedure. Hearings will be conducted in a fair and 
impartial manner by the administrative law judge, who may limit 
attendance at any hearing or portion thereof to the parties, their 
representatives and witnesses if the administrative law judge deems 
this necessary or advisable in order to protect sensitive matter (see 
Sec. 280.613 of this part) from improper disclosure. The rules of 
evidence prevailing in courts of law do not apply, and all evidentiary 
material deemed by the administrative law judge to be relevant and 
material to the proceeding and not unduly repetitious will be received 
and given appropriate weight.
    (c) Testimony and record. Witnesses will testify under oath or 
affirmation. A verbatim record of the hearing and of any other oral 
proceedings will be taken by reporter or by electronic recording, 
transcribed and filed with the administrative law judge. A respondent 
may examine the transcript and may obtain a copy by paying any 
applicable costs. Upon such terms as the administrative law judge deems 
just, the ALJ may direct that the testimony of any person be taken by 
deposition and may admit an affidavit or declaration as evidence, 
provided that any affidavits or declarations have been filed and served 
on the parties sufficiently in advance of the hearing to permit a party 
to file and serve an objection thereto on the grounds that it is 
necessary that the affiant or declarant testify at the hearing and be 
subject to cross-examination.
    (d) Failure to appear. If a party fails to appear in person or by 
counsel at a scheduled hearing, the hearing may nevertheless proceed, 
and that party's failure to appear will not affect the validity of the 
hearing or any proceedings or action taken thereafter.

Sec. 280.616  Interlocutory review of rulings.

    (a) At the request of a party, or on the administrative law judge's 
own initiative, the administrative law judge may certify to the Under 
Secretary for review a ruling that does not finally dispose of a 
proceeding, if the administrative law judge determines that immediate 
review may hasten or facilitate the final disposition of the matter.
    (b) Upon certification to the Under Secretary of the interlocutory 
ruling for review, the parties will have 10 days to file and serve 
briefs stating their positions, and five days to file and serve 
replies, following which the Under Secretary will decide the matter 
promptly.

Sec. 280.617  Proceeding without a hearing.

    If the parties have waived a hearing, the case will be decided on 
the record by the administrative law judge. Proceeding without a 
hearing does not relieve the parties from the necessity of proving the 
facts supporting their charges or defenses. Affidavits or declarations, 
depositions, admissions, answers to interrogatories and stipulations 
may supplement other documentary evidence in the record. The 
administrative law judge will give each party reasonable opportunity to 
file rebuttal evidence.

Sec. 280.618  Procedural stipulations; extension of time.

    (a) Procedural stipulations. Unless otherwise ordered, a written 
stipulation agreed to by all parties and filed with the administrative 
law judge will modify any procedures established by this part.
    (b) Extension of time. (1) The parties may extend any applicable 
time limitation, by stipulation filed with the administrative law judge 
before the time limitation expires.
    (2) The administrative law judge may, on the judge's own initiative 
or upon application by any party, either before or after the expiration 
of any applicable time limitation, extend the time within which to file 
and serve an answer to a charging letter or do any other act required 
by this part.

Sec. 280.619  Decision of the administrative law judge.

    (a) Predecisional matters. Except for default proceedings under 
Sec. 280.609 of this part, the administrative law judge will give the 
parties reasonable opportunity to submit the following, which will be 
made a part of the record:
    (1) Exceptions to any ruling by the judge or to the admissibility 
of evidence proffered at the hearing;
    (2) Proposed findings of fact and conclusions of law;
    (3) Supporting legal arguments for the exceptions and proposed 
findings and conclusions submitted; and
    (4) A proposed order.
    (b) Decision and order. After considering the entire record in the 
proceeding, the administrative law judge will issue a written initial 
decision. The decision will include

[[Page 50578]]

findings of fact, conclusions of law, and findings as to whether there 
has been a violation of the Act, this part, or any order issued 
thereunder. If the administrative law judge finds that the evidence of 
record is insufficient to sustain a finding that a violation has 
occurred with respect to one or more charges, the ALJ shall order 
dismissal of the charges in whole or in part, as appropriate. If the 
administrative law judge finds that one or more violations have been 
committed, the ALJ may issue an order imposing administrative 
sanctions, as provided in this part. The decision and order shall be 
served on each party, and shall become effective as the final decision 
of the Department 30 days after service, unless an appeal is filed in 
accordance with Sec. 280.623 of this part. In determining the amount of 
any civil penalty the ALJ shall consider the nature, circumstances and 
gravity of the violation and, with respect to the person found to have 
committed the violation, the degree of culpability, any history of 
prior violations, the effect on ability to continue to do business, any 
good faith attempt to achieve compliance, ability to pay the penalty, 
and such other matters as justice may require.
    (c) Suspension of sanctions. Any order imposing administrative 
sanctions may provide for the suspension of the sanction imposed, in 
whole or in part and on such terms of probation or other conditions as 
the administrative law judge or the Under Secretary may specify. Any 
suspension order may be modified or revoked by the signing official 
upon application by the Department showing a violation of the 
probationary terms or other conditions, after service on the respondent 
of notice of the application in accordance with the service provisions 
of Sec. 280.607 of this part, and with such opportunity for response as 
the responsible signing official in his/her discretion may allow. A 
copy of any order modifying or revoking the suspension shall also be 
served on the respondent in accordance with the provisions of 
Sec. 280.607 of this part.

Sec. 280.620  Settlement.

    (a) Cases may be settled before service of a charging letter. In 
cases in which settlement is reached before service of a charging 
letter, a proposed charging letter will be prepared, and a settlement 
proposal consisting of a settlement agreement and order will be 
submitted to the Assistant Secretary for approval and signature. If the 
Assistant Secretary does not approve the proposal, he/she will notify 
the parties and the case will proceed as though no settlement proposal 
had been made. If the Assistant Secretary approves the proposal, he/she 
will issue an appropriate order, and no action will be required by the 
administrative law judge.
    (b) Cases may also be settled after service of a charging letter. 
(1) If the case is pending before the administrative law judge, the ALJ 
shall stay the proceedings for a reasonable period of time, usually not 
to exceed 30 days, upon notification by the parties that they have 
entered into good faith settlement negotiations. The administrative law 
judge may, in his/her discretion, grant additional stays. If settlement 
is reached, a proposal will be submitted to the Assistant Secretary for 
approval and signature. If the Assistant Secretary approves the 
proposal, he/she will issue an appropriate order, and notify the 
administrative law judge that the case is withdrawn from adjudication. 
If the Assistant Secretary does not approve the proposal, he/she will 
notify the parties and the case will proceed to adjudication by the 
administrative law judge as though no settlement proposal had been 
made.
    (2) If the case is pending before the Under Secretary under 
Sec. 280.623 of this part, the parties may submit a settlement proposal 
to the Under Secretary for approval and signature. If the Under 
Secretary approves the proposal, he/she will issue an appropriate 
order. If the Under Secretary does not approve the proposal, the case 
will proceed to final decision in accordance with Section 280.623 of 
this part, as appropriate.
    (c) Any order disposing of a case by settlement may suspend the 
administrative sanction imposed, in whole or in part, on such terms of 
probation or other conditions as the signing official may specify. Any 
such suspension may be modified or revoked by the signing official, in 
accordance with the procedures set forth in Sec. 280.619(c) of this 
part.
    (d) Any respondent who agrees to an order imposing any 
administrative sa
FR Doc. 96-24105 Procedures for Implementation of the Fastener Quality Act
nction does so solely for the purpose of resolving the 
claims in the administrative enforcement proceeding brought under this 
part. This reflects the fact that the Department has neither the 
authority nor the responsibility for instituting, conducting, settling, 
or otherwise disposing of criminal proceedings. That authority and 
responsibility is vested in the Attorney General and the Department of 
Justice.
    (e) Cases that are settled may not be reopened or appealed.

Sec. 280.621  Reopening.

    The respondent may petition the administrative law judge within one 
year of the date of the final decision, except where the decision 
arises from a default judgment or from a settlement, to reopen an 
administrative enforcement proceeding to receive any relevant and 
material evidence which was unknown or unobtainable at the time the 
proceeding was held. The petition must include a summary of such 
evidence, the reasons why it is deemed relevant and material, and the 
reasons why it could not have been presented at the time the 
proceedings were held. The administrative law judge will grant or deny 
the petition after providing other parties reasonable opportunity to 
comment. If the proceeding is reopened, the administrative law judge 
may make such arrangements as the ALJ deems appropriate for receiving 
the new evidence and completing the record. The administrative law 
judge will then issue a new initial decision and order, and the case 
will proceed to final decision and order in accordance with 
Sec. 280.623 of this part.

Sec. 280.622  Record for decision and availability of documents.

    (a) General. The transcript of hearings, exhibits, rulings, orders, 
all papers and requests filed in the proceedings and, for purposes of 
any appeal under Sec. 280.623 of this part, the decision of the 
administrative law judge and such submissions as are provided for by 
Sec. 280.623 of this part, will constitute the record and the exclusive 
basis for decision. When a case is settled after the service of a 
charging letter, the record will consist of any and all of the 
foregoing, as well as the settlement agreement and the order. When a 
case is settled before service of a charging letter, the record will 
consist of the proposed charging letter, the settlement agreement and 
the order.
    (b) Restricted access. On the administrative law judge's own 
motion, or on the motion of any party, the administrative law judge may 
direct that there be a restricted access portion of the record for any 
material in the record to which public access is restricted by law or 
by the terms of a protective order entered in the proceedings. A party 
seeking to restrict access to any portion of the record is responsible 
for submitting, at the time specified in Sec. 280.622(c)(2) of this 
part, a version of the document proposed for public availability that 
reflects the requested deletion. The restricted access portion of the 
record will be placed in a separate file and the file will be clearly 
marked to avoid improper disclosure and to

[[Page 50579]]

identify it as a portion of the official record in the proceedings. The 
administrative law judge may act at any time to permit material that 
becomes declassified or unrestricted through passage of time to be 
transferred to the unrestricted access portion of the record.
    (c) Availability of documents--(1) Scope. All charging letters, 
answers, initial decisions, and orders disposing of a case will be made 
available for public inspection in the BXA Freedom of Information 
Records Inspection Facility, U.S. Department of Commerce, Room H-6624, 
14th Street and Pennsylvania Avenue, NW, Washington, DC 20230. The 
complete record for decision, as defined in paragraphs (a) and (b) of 
this section will be made available on request.
    (2) Timing. Documents are available immediately upon filing, except 
for any portion of the record for which a request for segregation is 
made. Parties that seek to restrict access to any portion of the record 
under paragraph (b) of this section must make such a request, together 
with the reasons supporting the claim of confidentiality, 
simultaneously with the submission of material for the record.

Sec. 280.623  Appeals.

    (a) Grounds. A party may appeal to the Under Secretary from an 
order disposing of a proceeding or an order denying a petition to set 
aside a default or a petition for reopening, on the grounds:
    (1) That a necessary finding of fact is omitted, erroneous or 
unsupported by substantial evidence of record;
    (2) That a necessary legal conclusion or finding is contrary to 
law;
    (3) That prejudicial procedural error occurred; or
    (4) That the decision or the extent of sanctions is arbitrary, 
capricious or an abuse of discretion. The appeal must specify the 
grounds on which the appeal is based and the provisions of the order 
from which the appeal is taken.
    (b) Filing of appeal. An appeal from an order must be filed with 
the Office of the Under Secretary for Export Administration, Bureau of 
Export Administration, U.S. Department of Commerce, Room H-3898, 14th 
Street and Constitution Avenue, NW., Washington, DC 20230, within 30 
days after service of the order appealed from. If the Under Secretary 
cannot act on an appeal for any reason, the Under Secretary will 
designate another Department of Commerce official to receive and act on 
the appeal.
    (c) Effect of appeal. The filing of an appeal shall not stay the 
operation of any order, unless the order by its express terms so 
provides or unless the Under Secretary, upon application by a party and 
with opportunity for response, grants a stay.
    (d) Appeal procedure. The Under Secretary normally will not hold 
hearings or entertain oral argument on appeals. A full written 
statement in support of the appeal must be filed with the appeal and be 
simultaneously served on all parties, who shall have 30 days from 
service to file a reply. At his/her discretion, the Under Secretary may 
accept new submissions, but will not ordinarily accept those 
submissions filed more than 30 days after the filing of the reply to 
the appellant's first submission.
    (e) Decisions. The decision will be in writing and will be 
accompanied by an order signed by the Under Secretary giving effect to 
the decision. The order may either dispose of the case by affirming, 
modifying or reversing the order of the administrative law judge or may 
refer the case back to the administrative law judge for further 
proceedings.
    (f) Delivery. The final decision and implementing order shall be 
served on the parties and will be publicly available in accordance with 
Sec. 280.622 of this part.
    (g) Judicial Review. The charged party may appeal the Under 
Secretary's written order within 30 days to the appropriate United 
States District Court pursuant to section 9(b)(3) of the Act (15 U.S.C. 
5408(b)(3)) by filing a notice of appeal in such court within 30 days 
from the date of such order and by simultaneously sending a copy of 
such notice by certified mail to the Chief Counsel for Export 
Administration, Room H-3839, U.S. Department of Commerce, 14th Street 
and Constitution Avenue, NW., Washington, DC 20230. The findings and 
order of the Under Secretary shall be set aside by such court if they 
are found to be unsupported by substantial evidence, as provided in 
section 706(2) of title 5 United States Code.

Subpart H--Recordal of Insignia

Sec. 280.700  Recorded insignia required prior to offer for sale.

    (a) Any manufacturer or private label distributor of a fastener 
must, prior to any sale or offer for sale of any fastener which is 
required by the standards and specifications by which it is 
manufactured to bear a raised or depressed insignia identifying its 
manufacturer or private label distributor, apply for and record an 
insignia to be applied to any fastener which is to be sold or offered 
for sale to ensure that each fastener may be traced to its manufacturer 
or private label distributor.
    (b) The manufacturer's or private label distributor's insignia must 
be applied to any fastener which is sold or offered for sale if such 
fastener is required by the standards and specification by which it is 
manufactured to bear a raised or depressed insignia identifying its 
manufacturer or private label distributor. If the fastener has no head, 
the insignia must be applied to another surface area in a legible 
manner.
    (c) The insignia must be applied through a raised or depressed 
impression. The insignia must be readable with no greater than 10x 
magnification.

The Written Application

Sec. 280.710  Applications for insignia.

    (a) Each manufacturer or private label distributor must submit a 
written application for recordal of an insignia on the Fastener 
Insignia Register along with the prescribed fee. The application must 
be in a form prescribed by the Commissioner.
    (b) The written application must be in the English language and 
must include the following:
    (1) The name of the applicant;
    (2) The address of the applicant;
    (3) The entity, domicile, and state of incorporation, if 
applicable, of the applicant;
    (4) either:
    (i) A request for recordal and issuance of a unique alphanumeric 
designation by the Commissioner, or
    (ii) A request for recordal of a trademark, which is the subject of 
either a duly filed application or a registration for fasteners in the 
name of the applicant in the U.S. Patent and Trademark Office on the 
Principal Register, indicating the application serial number or 
registration number and accompanied by a copy of the drawing page of 
the application or a copy of the registration;
    (5) A statement that the applicant will comply with the applicable 
provisions of the Fastener Quality Act;
    (6) A statement that the person signing the application on behalf 
of the applicant has personal knowledge of the facts relevant to the 
application and that the person possesses the authority to act on 
behalf of the applicant;
    (7) A verification stating that the person signing declares under 
penalty of perjury under the laws of the United States of America that 
the information and statements included in the application are true and 
correct; and

[[Page 50580]]

    (8) The application fee.
    (c) An applicant may designate only one registered trademark for 
recordal on the Fastener Insignia Register in a single application. The 
trademark application or registration which forms the basis for the 
fastener recordal must be in active status, that is a pending 
application or a registration which is not expired, abandoned or 
canceled, at the time of the application for recordal.
    (d) Applications and other documents should be addressed to: Box 
Fastener, Commissioner of Patents and Trademarks, Washington DC 20231.

Sec. 280.711  Review of the application.

    The Commissioner will review the application for compliance with 
Sec. 280.710. If the application does not contain one or more of the 
elements required by Sec. 280.710, the Commissioner will not issue a 
certificate of recordal, and will return the papers and fees. The 
Commissioner will notify the applicant of any defect in the 
application. Applications for recordal of an insignia may be re-
submitted to the Commissioner at any time.

Sec. 280.712  Certificate of recordal.

    If the application complies with the requirements of Sec. 280.710, 
the Commissioner shall accept the application and issue a certificate 
of recordal. Such certificate shall be issued in the name of the United 
States of America, under the seal of the Patent and Trademark Office, 
and a record shall be kept in the Patent and Trademark Office. The 
certificate of recordal shall display the recorded insignia of the 
applicant, and state the name, address, legal entity and domicile of 
the applicant, as well as the date of issuance of such certificate.

Sec. 280.713  Recordal of additional insignia.

    (a) A manufacturer or private label distributor to whom the 
Commissioner has issued an alphanumeric designation may apply for 
recordal of its trademark for fasteners if the trademark is the subject 
of a duly filed application or is registered in the U.S. Patent and 
Trademark Office on the Principal Register. Upon recordal, either the 
alphanumeric designation or the registered mark, or both, may be used 
as recorded insignias.
    (b) A manufacturer or private label distributor for whom the 
Commissioner has recorded a trademark as its fastener insignia, may 
apply for issuance and recordal of an alphanumeric designation as a 
fastener insignia. Upon recordal, either the alphanumeric designation 
or the trademark, or both, may be used as recorded insignias.

Post-Recordal Maintenance

Sec. 280.720  Maintenance of the certificate of recordal.

    (a) Certificates of recordal remain in an active status for five 
years and may be maintained in an active status for five-year periods 
running consecutively from the date of issuance of the certificate of 
recordal upon compliance with the requirements of Sec. 280.720(c).
    (b) Maintenance applications shall be required only if the holder 
of the certificate of recordal is a manufacturer or private label 
distributor at the time the maintenance application is required.
    (c) Certificates of recordal will be designated as inactive unless, 
within six months prior to the expiration of each five-year period 
running consecutively from the date of issuance, the certificate holder 
files the prescribed maintenance fee and the maintenance application. 
The maintenance application must be in the English language and must 
include the following:
    (1) The name of the applicant;
    (2) The address of the applicant;
    (3) The entity, domicile, and state of incorporation, if 
applicable, of the applicant;
    (4) A copy of applicant's certificate of recordal;
    (5) A statement that the applicant will comply with the applicable 
provisions of the Fastener Quality Act;
    (6) A statement that the person signing the application on behalf 
of the applicant has knowledge of the facts relevant to the application 
and that the person possesses the authority to act on behalf of the 
applicant;
    (7) A verification stating that the person signing declares under 
penalty of perjury under the laws of the United States of America that 
the information and statements included in the application are true and 
correct; and
    (8) The maintenance application fee.
    (d) Where no maintenance application is timely filed, a certificate 
of recordal will be designated inactive. However, such certificate may 
be designated active if the certificate holder files the prescribed 
maintenance fee and application and the additional surcharge within six 
months following the expiration of the certificate of recordal.
    (e) After the six-month period following the expiration of the 
certificate of recordal, the certificate of recordal shall be deemed 
active only if the certificate holder files a new application for 
recordal with the prescribed fee for obtaining a fastener insignia and 
attaches a copy of the expired certificate of recordal.
    (f) A separate maintenance application and fee must be filed and 
paid for each recorded insignia.

Sec. 280.721  Notification of changes of address.

    The applicant or the holder of a certificate of recordal shall 
notify the Commissioner of any change of address or change of name no 
later than six months after the change. The holder must do so whether 
the certificate of recordal is in an active or inactive status.

Sec. 280.722  Transfer or amendment of the certificate of recordal.

    (a) The certificate of recordal cannot be transferred or assigned.
    (b) The certificate of recordal may be amended only to show a 
change of name or change of address.

Sec. 280.723  Transfer or assignment of the trademark registration or 
recorded insignia.

    (a) A trademark application or registration which forms the basis 
of a fastener recordal may be transferred or assigned. Any transfer or 
assignment of such an application or registration shall be recorded in 
the Patent and Trademark Office within three months of the transfer or 
assignment. A copy of such transfer or assignment must also be sent to: 
Box Fastener, Commissioner of Patents and Trademarks, Washington, DC 
20231.
    (b) Upon transfer or assignment of a trademark application or 
registration which forms the basis of a certificate of recordal, the 
Commissioner shall designate the certificate of recordal as inactive. 
The certificate of recordal shall be deemed inactive as of the 
effective date of the transfer or assignment. Certificates of recordal 
designated inactive due to transfer or assignment of a trademark 
application or registration cannot be reactivated.
    (c) An assigned trademark application or registration may form the 
basis for a new application for recordal of a fastener insignia.
    (d) A fastener insignia consisting of an alphanumeric designation 
issued by the Commissioner can be transferred or assigned.
    (e) Upon transfer or assignment of an alphanumeric designation, the 
Commissioner shall designate such alphanumeric designation as inactive. 
The alphanumeric designation shall be deemed inactive as of the 
effective date of the transfer or assignment. Alphanumeric designations 
which are designated inactive due to transfer or assignment may be 
reactivated upon application by the assignee of such alphanumeric 
designation. Such application must meet all the

[[Page 50581]]

requirements of Sec. 280.710 and must include a copy of the pertinent 
portions of the document assigning rights in the alphanumeric 
designation. Such application must be filed within six months of the 
date of assignment.

Sec. 280.724  Change in status of trademark registration or amendment 
of the trademark.

    (a) The Commissioner shall designate the certificate of recordal as 
inactive, upon:
    (1) Issuance of a final decision on appeal which refuses 
registration of the application which formed the basis for the 
certificate of recordal; or
    (2) Abandonment of the application which formed the basis for the 
certificate of recordal; or
    (3) Cancellation or expiration of the trademark registration which 
formed the basis of the certificate of recordal.
    (b) Any amendment of the mark in a trademark application or 
registration which forms the basis for a certificate of recordal will 
result in such certificate of recordal being designated inactive. The 
certificate of recordal shall become inactive as of the date of the 
amendment of the trademark. A new application for recordal of the 
amended trademark application or registration may be submitted to the 
Commissioner at any time.
    (c) Certificates of recordal designated inactive due to 
cancellation, expiration, abandonment or amendment of the trademark 
application or registration cannot be reactivated.

Sec. 280.725  Cumulative listing of recordal information.

    The Commissioner shall maintain a record of the names, current 
addresses, and legal entities of all recorded manufacturers and private 
label distributors and their recorded insignia.

Sec. 280.726  Records and files of the Patent and Trademark Office.

    The records relating to fastener insignia shall be open to public 
inspection. Copies of any such records may be obtained upon request and 
payment of the fee set by the Commissioner.

[FR Doc. 96-24105 Filed 9-25-96; 8:45 am]
BILLING CODE 3510-13-P

Complete official Federal Register PDF

FR Doc. 96-24064 Defense Federal Acquisition Regulation Supplement; Miscellaneous Amendments
[Federal Register Volume 61, Number 188 (Thursday, September 26, 1996)]
[Rules and Regulations]
[Pages 50446-50458]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-24064]

[[Page 50446]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

48 CFR Parts 201, 202, 204, 206, 207, 209, 212, 214, 215, 219, 223, 
225, 227, 228, 231, 232, 235, 239, 242, 244, 249, 250, 252, 253, 
and Appendices B, C, G, and I

[Defense Acquisition Circular (DAC) 91-11]

Defense Federal Acquisition Regulation Supplement; Miscellaneous 
Amendments

AGENCY: Department of Defense (DoD).

ACTION: Final rules.

-----------------------------------------------------------------------

SUMMARY: Defense Acquisition Circular (DAC) 91-11 amends the Defense 
Federal Acquisition Regulation Supplement (DFARS) to revise, finalize, 
or add language on competition requirements, acquisition planning, 
contractor qualifications, contracting by negotiation, ozone-depleting 
substances, drug-free work force, foreign acquisition, bonds and 
insurance, contract cost principles and procedures, contract financing, 
research and development contracting, acquisition of information 
resources, contract administration, and subcontracting policies and 
procedures.

DATES: Effective date: September 26, 1996.

FOR FURTHER INFORMATION CONTACT:
Ms. Susan Buckmaster, PDUSD(A&T)DP(DAR),IMD 3D139, 3062 Defense 
Pentagon, Washington, DC 20301-3062. Telephone (703) 602-0131.

SUPPLEMENTARY INFORMATION: 

A. Background

    This Defense Acquisition Circular (DAC) 91-11 includes 30 rules and 
miscellaneous editorial amendments. Ten of the rules (Items, III, VI, 
VII, VIII, XI, XII, XX, XXII, XXIII, and XXVI) were published 
previously in the Federal Register and thus are not included as part of 
this notice of amendments to the Code of Federal Regulations. These ten 
rules are being published in the DAC incorporate the previously 
published amendments into the loose-leaf edition of the DFARS.

B. Regulatory Flexibility Act

DAC 91-11, Items I, II, X, XIV, XVIII, XIX, XXIV, XXV, and XXVII

    These final rules do not constitute significant revisions within 
the meaning of Federal Acquisition Regulation 1.501 and Public Law 98-
577, and publication of public comment is not required. However, 
comments from small entities concerning the affected DFARS subparts 
will be considered in accordance with Section 610 of the Regulatory 
Flexibility Act (5 U.S.C. 610). Please cite the applicable DFARS case 
number in correspondence.

DAC 91-11, Items V, XV, XVII, XXI, XXVIII, XXIX, and XXX

    DoD certifies that these rules will not have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act (5 U.S.C. 601 et seq.) because:
    Item V, Leasing of Commercial Vehicles and Equipment--Leasing of 
commercial vehicles and equipment is already permitted by the Federal 
Acquisition Regulation (FAR). This rule merely amends the Defense FAR 
Supplement (DFARS) to reflect DoD statutory authority and internal 
Government considerations pertaining to such leasing.
    Item XV, Naval Vessel Components--The foreign source restrictions 
contained in this rule do not differ significantly from existing 
foreign source restrictions.
    Item XVII, Pricing for Sales of Defense Articles--The DFARS already 
requires pricing of foreign military sales contracts using the same 
general principles that are used in pricing other defense contracts. 
The only significant change in this rule relates to the allowability of 
independent research and development and bid and proposal costs in 
accordance with the cost principle at FAR 31.205-18, under contracts 
for foreign military sales wholly paid for from nonrepayable funds. 
Most contracts awarded to small entities are awarded using simplified 
acquisition procedures, or on a competitive fixed-price basis, and do 
not require application of the FAR or DFARS cost principles.
    Item XXI, Allowability of Costs--The cost principle in this rule 
applies only to costs for bonuses or other payments in excess of the 
normal salary paid by a contractor to an employee, when such payments 
are part of restructuring costs associated with a business combination. 
Most contracts awarded to small entities are awarded using simplified 
acquisition procedures, or on a competitive fixed-price basis, and do 
not require application of the FAR or DFARS cost principles.
    Item XXVIII, Material Management and Accounting System Changes--
Material management and accounting system (MMAS) requirements only 
apply to contracts exceeding the simplified acquisition threshold that 
are not for the acquisition of commercial items and are not awarded 
under the set-aside or Section 8(a) procedures of FAR Part 19. 
Additionally, MMAS disclosure, demonstration, and maintenance 
requirements only apply to large business concerns.
    Item XXIX, Contractor Purchasing System Reviews--Contractor 
purchasing system reviews generally are conducted only for contractors 
that are expected to have annual sales to the Government exceeding $25 
million.
    Item XXX, Ground and Flight Risk--The amendments in this rule only 
apply to contracts for aircraft development, production, modification, 
maintenance, repair, or overhaul, or otherwise involving the furnishing 
of aircraft to the contractor by the Government. Historically, most 
contractors engaged in this type of contract have been large business 
concerns.

DAC 91-11, Items IV, IX, XIII, and XVI

    A final regulatory flexibility analysis has been performed for each 
of these rules. A copy of the analysis is available by writing the 
Defense Acquisition Regulations Council, PDUSD(A&T)DP(DAR), 3062 
Defense Pentagon, Washington, DC 20301-3062. Please cite the applicable 
DFARS case number in correspondence. The analyses are summarized as 
follows:
    Item IV, Precontractual Contract Administration (DFARS Case 95-
D015)--This final rule amends the DFARS to provide the contract 
administration component access to acquisition planning information, 
set forth the fact that costs or savings related to contract 
administration may be considered when evaluating an offeror's past 
performance, and establish as a contract administration function the 
providing of support to program offices and buying activities in 
precontractual efforts leading to a solicitation or award. No public 
comments were received in response to the initial regulatory 
flexibility analysis prepared for the proposed rule published in the 
Federal Register at 60 FR 53573 on October 16, 1995. The rule applies 
to all entities, large and small, that compete for DoD contracts 
awarded using past performance as an evaluation factor. The rule 
imposes no new reporting, recordkeeping, or other compliance 
requirements. The alternative of not making the revisions to DFARS 
Parts 207 and 242 was considered, since the Federal Acquisition 
Regulation (FAR) already permits involvement of contract administration 
components in precontractual efforts. However, it was determined that 
these revisions are needed to ensure that the contract administration 
component has access to early acquisition planning information and is 
involved in precontractual planning in order to allow for efficient

[[Page 50447]]

and effective contract administration support throughout the 
acquisition. The alternative of not making the revisions to DFARS Parts 
209 and 215 was also considered, since the FAR already permits the use 
of contract and audit data in evaluating performance risk or past 
performance. It was determined that specifically citing costs and 
savings related to contract administration and audit as a factor in 
evaluating performance risk or past performance will encourage use of 
this factor and will be beneficial in refining the process for 
determining the best value to the Government.
    Item IX, Drug Free Work Force (DFARS Case 88-083)--This rule is 
necessary to implement DoD policy to ensure that its contractors 
maintain programs for achieving a drug-free work force. No public 
comments were received in response to the initial regulatory 
flexibility analysis prepared for the interim rule published in the 
Federal Register at 57 FR32736 on July 23, 1992. The rule applies to 
large and small entities with DoD contracts that involve access to 
classified information, or that include the prescribed clause for 
reasons of national security or for the purpose of protecting the 
health or safety of those using or affected by the product of, or 
performance of, the contract. The rule requires that certain DoD 
contractors maintain a drug-free work force program, including 
recordkeeping necessary to ensure that any instances of illegal drug 
use be dealt with in accordance with the contractor's program. The 
recordkeeping required by DFARS clause 252.223-7004 has been approved 
by the Office of Management and Budget under OMB Control Number 0704-
0336. Consideration was given to elimination of the rule in light of 
Federal Acquisition Regulation (FAR) Subpart 23.5, which implements the 
Drug-Free Work Force Act of 1988. However, the FAR addresses illegal 
drugs only in the workplace. The DoD policy is that any drug use by a 
contractor employee working in a sensitive position under a DoD 
contract may adversely affect national security, health, or safety of 
those using or affected by the product of, or performance of, the 
contract.
    Item XIII, Ball and Roller Bearings (DFARS Case 95-D308)--This 
final rule implements Section 8099 of the Fiscal Year 1996 Defense 
Appropriations Act (Pub. L. 104-61) and 10 U.S.C. 2534 as amended by 
Sections 806(b) and (d) of the Fiscal Year 1996 Defense Authorization 
Act (Pub. L. 104-106), which extend the statutory restriction on the 
acquisition of nondomestic ball and roller bearings through the year 
2000, but reduce the exceptions to the restriction and limit waiver 
authority when Fiscal Year 1996 funds are used. There were no issues 
raised by public comments in response to the initial regulatory 
flexibility analysis prepared for the interim rule published in the 
Federal Register at 61 FR 10899 on March 18, 1996. The final rule 
incorporates the restriction on miniature and instrument ball bearings 
that is presently included in DFARS Subpart 225.71, and specifically 
identifies the commercial item exception to the requirements of Section 
8099 of the Fiscal Year 1996 Defense Appropriations Act. The rule 
applies to all small and large entities that are interested in 
furnishing to the Government ball or roller bearings or items 
incorporating ball or roller bearings. The rule lessens foreign 
competition for domestic sources, particularly in acquisitions that do 
not exceed the simplified acquisition threshold, and is expected to 
have a positive impact on both small and large entities. The rule 
imposes no new recordkeeping or reporting requirements. The existing 
recordkeeping and reporting required by DFARS clause 252.225-7025 has 
been approved by the Office of Management and Budget under OMB Control 
Number 0704-0229.
    Item XVI, Foreign Product Restrictions (DFARS Case 95-D033)--This 
final rule eliminates all foreign product restrictions in DFARS Subpart 
225.71, with the exception of ship propulsion shafts (excluding service 
and landing craft shafts), periscope tubes, and ring forgings for bull 
gears (greater than 120 inches in diameter). The restriction on 
miniature and instrument ball bearings is being incorporated in DFARS 
225.7019 with the other statutory restrictions on ball and roller 
bearings, because 10 U.S.C. 2534(a)(5) provides for restrictions on 
ball and roller bearings in accordance with DFARS Subpart 225.71, as in 
effect on October 23, 1992. The elimination of the other restrictions 
in DFARS Subpart 225.71 is based on an assessment by DoD that these 
restrictions are no longer needed. The objective of this rule is to 
maximize full and open competition to the extent consistent with 
maintenance of a viable domestic industrial base. No comments were 
received in response to the initial regulatory flexibility analysis 
prepared for the proposed rule published in the Federal Register at 60 
FR 67115 on December 28, 1995. However, a number of respondents 
expressed concern that the rule's elimination of foreign product 
restrictions would weaken the domestic forging industry and the 
national security. Therefore, retention of the foreign product 
restrictions on forgings was considered, but rejected for the following 
reasons: The restrictions were originally imposed to preserve a 
domestic mobilization base for specific classes of items, including 
various ferrous forgings, needed to meet Cold War era operational 
scenarios. DoD no longer has such a requirement for the classes of 
forgings under consideration. Therefore, the mobilization base for 
these forgings is no longer required. Additionally, both productivity 
and exports have increased for the domestic forging industry.
    The rule will affect the preference for domestic manufacturers of 
the items no longer restricted. It is estimated that approximately 90 
contractors, some of which are small businesses, supply such items to 
DoD either as prime contractors or subcontractors under defense 
contracts. The information collection required by DFARS clause 252.225-
7025 has been approved by the Office of Management and Budget under OMB 
Control Number 0704-0229. The rule will reduce this information 
collection requirement, as recordkeeping and reporting will no longer 
be required for those items which are no longer restricted to domestic 
sources. There are no practical alternatives which would affect the 
impact on small entities and still accomplish the objectives of the 
rule.

C. Paperwork Reduction Act

DAC 91-11, Items I, II, IV, V, X, XIV, XV, XVII, XVIII, XIX, XXI, XXIV, 
XXV, XXVII, XXIX, and XXX

    The Paperwork Reduction Act does not apply because these rules do 
not contain information collection requirements which require the 
approval of the Office of Management and Budget (OMB) under 44 U.S.C. 
3501 et seq.

DAC 91-11, Items IX, XIII, XVI, and XXVIII

    The Paperwork Reduction Act applies. OMB has approved the 
information collection requirements as follows:

------------------------------------------------------------------------
                                                             OMB control
                            Item                                number  
------------------------------------------------------------------------
IX.........................................................    0704-0336
XIII.......................................................    0704-0229
XVI........................................................    0704-0229
XXVIII.....................................................    0704-0250
------------------------------------------------------------------------

[[Page 50448]]

Michele P. Peterson,
Executive Editor, Defense Acquisition Regulations Council.

    Defense Acquisition Circular (DAC) 91-11 amends the Defense Federal 
Acquisition Regulation Supplement (DFARS) 1991 edition. The amendments 
are summarized as follows:

Item I--Revisions to FAR/DFARS (DFARS Case 96-D009)

    This final rule amends DFARS 201.201-1 to specify that requests for 
changes to the FAR or DFARS must identify any potential impact of the 
change on automated systems (e.g., automated financial and procurement 
systems).

Item II--Overseas Contracts With NATO/Allied Governments or the United 
Nations (DFARS Case 96-D004)

    This final rule amends DFARS 201.402 and adds a new section at 
225.970 to authorize contracting officers outside the United States to 
deviate from prescribed non-statutory FAR and DFARS clauses when 
contracting for support services, supplies, or construction, with the 
governments of North Atlantic Treaty Organization (NATO) countries or 
other allies (as described in 10 U.S.C. 2341(2)), or with United 
Nations or NATO organizations. This authority may be exercised only if 
such governments or organizations will not agree to the standard FAR/
DFARS clauses.

Item III--Justification and Approval Thresholds (DFARS Case 96-
D307)

    This final rule was issued by Departmental Letter 96-003, effective 
April 12, 1996 (61 FR 10285, March 13, 1996). The rule amends DFARS 
206.304 to implement Section 4102 of the Fiscal Year 1996 Defense 
Authorization Act (Pub. L. 104-106). Section 4102 amends 10 U.S.C. 
2304(f)(1)(B) and 41 U.S.C. 253(F)(1)(B) to increase the dollar 
thresholds at which approval for use of other than full and open 
competition must be obtained from the competition advocate, the head of 
the procuring activity, or the senior procurement executive.

Item IV--Precontractual Contract Administration (DFARS Case 95-
D015)

    This final rule amends DFARS Subparts 207.1, 209.1, 215.6, and 
242.3 to (1) provide for involvement of the contract administration 
office early in the acquisition process, and (2) specify that costs or 
savings related to contract administration and audit may be considered 
in proposal evaluation when an offeror's past performance or 
performance risk is likely to result in significant costs or savings.

Item V--Leasing of Commercial Vehicles and Equipment (DFARS Case 96-
D302)

    The interim rule issued by Departmental Letter 96-007, on April 18, 
1996, is revised and finalized. The rule amends DFARS 207.470 to 
implement Section 807 of the Fiscal Year 1996 Defense Authorization Act 
(Pub. L. 104-106). Section 807 amends 10 U.S.C. 2401a to permit the use 
of leasing in the acquisition of commercial vehicles and equipment. The 
final rule differs from the interim rule in that it clarifies that the 
requirements of 207.470(b) apply to the leasing of commercial vehicles 
and the equipment that is associated with those vehicles.

Item VI--Institutions of Higher Education (DFARS Case 96-D305)

    This interim rule was issued by Departmental Letter 96-012, 
effective May 21, 1996 (61 FR 25408, May 21, 1996). The rule amends 
DFARS 209.470 and 243.105 to implement Section 541 of the Fiscal Year 
1996 Defense Authorization Act (Pub. L. 104-106). Section 541 provides 
that no funds available to DoD may be provided by grant or contract to 
any institution of higher education that has an anti-ROTC policy.

Item VII--Small Disadvantaged Business Concerns (DFARS Case 95-D039)

    This final rule was issued by Departmental Letter 96-009, effective 
April 29, 1996 (61 FR 18686, April 29, 1996). The rule amends DFARS 
Parts 215, 219, 236, 242, 252, and 253 to (1) expand use of the 
evaluation preference for small disadvantaged businesses (SDBs) to 
include competitive awards based on other than price or price-related 
factors; (2) consider small, small disadvantaged, and women-owned small 
business subcontracting as a factor in the evaluation of past 
performance; (3) clarify that the contracting officer will weigh 
enforceable commitments to use small businesses, SDBs, women-owned 
small businesses, historically black colleges and universities, and 
minority institutions more heavily than non-enforceable ones, if the 
commitment to use such firms is included in the solicitation as a 
source selection criterion; (4) require prime contractors to notify the 
contracting officer of any substitutions of firms that are not small, 
small disadvantaged, or women-owned small businesses for the firms 
listed in the subcontracting plan; and (5) establish a test program of 
an SDB evaluation preference that would remove the bond cost 
differentials between SDBs and other businesses as a factor in most 
source selections for construction acquisitions.

Item VII--Test Program for Negotiation of Comprehensive Subcontracting 
Plans (DFARS Case 96-D304)

    This interim rule was issued by Departmental Letter 96-016, 
effective July 31, 1996 (61 FR 39900, July 31, 1996). The rule amends 
DFARS Subpart 219.7 and the clause at 252.219-7004 to reflect changes 
to the Test Program for Negotiation of Comprehensive Small Business 
Subcontracting Plans, as required by Section 811 of the Fiscal Year 
1996 Defense Authorization Act (Pub. L. 104-106). The rule also makes 
editorial changes to DFARS Part 219 to reflect revisions to FAR Part 19 
published in Federal Acquisition Circular 90-32.

Item IX--DRUG-Free Work Force (DFARS Case 88-083)

    The interim rule published as Item VII of DAC 91-3, and amended by 
Item XXXV of DAC 91-9, is converted to a final rule without change. The 
rule implements DoD policy regarding contractor maintenance of a drug-
free work force. The applicable DFARS guidance is at Subpart 223.5 and 
252.223-7004.

Item X--Ozone-Depleting Substances (DFARS Case 95-D037)

    This final rule adds DFARS Section 223.803 to provide a cross-
reference to the restrictions in DFARS 211.271 regarding award or 
modification of contracts requiring the use of class I ozone-depleting 
substances.

Item XI--Petroleum Products from Caribbean Basin Countries (DFARS 
Case 96-D312)

    This interim rule was issued by Departmental Letter 96-015, 
effective July 22, 1996 (61 FR 37841, July 22, 1996). The rule amends 
DFARS 225.403 to fully implement Section 8094 of the Fiscal Year 1994 
Defense Appropriations Act (Pub. L. 103-139). Section 8094 requires DoD 
to consider all qualified bids from eligible countries under the 
Caribbean Basin Economic Recovery Act as if they were offers from 
designated countries under the Trade Agreements Act. The rule also 
amends DFARS 225.403-70 and 252.225-7007 to clarify that the definition 
of Caribbean Basin country end products includes petroleum and any end 
product derived from petroleum.

[[Page 50449]]

Item XII--Designation of Singapore (DFARS Case 96-D308)

    This final rule was issued by Departmental Letter 96-008, effective 
April 18, 1996 (61 FR 16880, April 18, 1996). The rule amends DFARS 
225.408 and 252.225-7007 to add Singapore as a designated country under 
the Trade Agreements Act of 1979, as directed by the United States 
Trade Representative on March 19, 1996.

Item XIII--Ball and Roller Bearings (DFARS Case 95-D308)

    The interim rule issued by Departmental Letter 96-004 on March 18, 
1996, is revised and finalized. The rule implements Section 8099 of the 
Fiscal Year 1996 Defense Appropriations Act (Pub. L. 104-61) and 
Sections 806(b) and (d) of the Fiscal Year 1996 Defense Authorization 
Act (Pub. L. 104-106), which extend the statutory restrictions on the 
acquisition of nondomestic ball and roller bearings through the year 
2000, but reduce the exceptions to the restrictions and limit waiver 
authority when fiscal year 1996 funds are used to acquire other than 
commercial items. The final rule differs from the interim rule in that 
it amends DFARS 225.7001, 225.7019, and 252.225-7016 to include 
restrictions pertaining to the acquisition of miniature and instrument 
ball bearings which previously were included in Subpart 225.71 and 
252.225-7025.

Item XIV--Domestic Wool Preference (DFARS Case 96-D311)

    This final rule amends DFARS 225.7002 and deletes the provision at 
252.225-7013 to eliminate special procedures for evaluation of offers 
for wool. In December 1995, the U.S. Department of Agriculture 
discontinued the practice of establishing incentive prices for domestic 
wool, which was the practice upon which the special evaluation 
procedures were based. Corresponding amendments are made at 212.301.

Item XV--Naval Vessel Components (DFARS Case 96-D300)

    The interim rule issued by Departmental Letter 96-005, on March 26, 
1996, is converted to a final rule without change. The rule amends 
DFARS 225.7012 and 225.7022 to implement Section 806(a) of the Fiscal 
Year 1996 Defense Authorization Act (Pub. L. 104-106). Section 806(a) 
imposes additional statutory restrictions on the acquisition of anchor 
and mooring chain and totally enclosed lifeboats, when used as 
components of naval vessels. The rule further amends 225.7012, and 
deletes the clauses at 252.225-7020 and 252.225-7021, to remove 
obsolete language pertaining to fiscal year 1988-90 restrictions on the 
acquisition of anchor and mooring chain.

Item XVI--Foreign Product Restrictions (DFARS Case 95-D033)

    This final rule amends DFARS Subpart 225.71 and the clause at 
252.225-7025 to eliminate non-statutory foreign product restrictions 
except those for certain forging items (ship propulsion shafts, 
periscope tubes, and ring forgings for bull gears). Restrictions 
pertaining to miniature and instrument ball bearings have been moved to 
Subpart 225.70 and 252.225-7016.

Item XVII--Pricing for Sales of Defense Articles (DFARS Case 96-
D309)

    The interim rule issued by Departmental Letter 96-010, on April 30, 
1996, is converted to a final rule without change. The rule amends 
DFARS 225.7303 to implement Section 531A of the Fiscal Year 1996 
Foreign Operations, Export Financing, and Related Programs 
Appropriations Act (Pub. L. 104-107). Section 531A provides that 
foreign military sales of defense articles and services wholly paid for 
from funds made available on a nonrepayable basis shall be priced on 
the same costing basis as is applicable to like items purchased by DoD 
for its own use.

Item XVIII--Alternatives to Miller Act Bonds (DFARS Case 95-D305)

    This final rule removes DFARS 228.171 and 252.228-7007. These 
sections were published as Item XXIII of DAC 91-9, and amended by Item 
X of DAC 91-10, to provide alternative payment protections for 
construction contracts between $25,000 and $100,000, pending 
implementation of Section 4104(b)(2) of the Federal Acquisition 
Streamlining Act of 1994 (Pub. L. 103-355) in the FAR. The implementing 
FAR guidance was published as Item XVII of FAC 90-39; therefore, the 
DFARS guidance is removed.

Item XIX--Insurance--Liability to Third Parties (DFARS Case 92-
D015)

    This final rule amends DFARS 228.311 to remove guidance pertaining 
to use of the clause at FAR 52.228-6, Insurance--Immunity from Tort 
Liability, as this clause was removed from the FAR by item XII of FAC 
90-37.

Item XX--Individual Compensation (DFARS Case 96-D314)

    This interim rule was issued by Departmental Letter 96-014, 
effective July 10, 1996 (61 FR 36305, July 10, 1996). The rule amends 
DFARS Part 231 to implement Section 8086 of the Fiscal Year 1996 
Defense Appropriations Act (Pub. L. 104-61). Section 8086 limits 
allowable costs for individual compensation to $200,000 per year. This 
limitation applies to payments using funds appropriated in fiscal year 
1996 under contracts awarded after July 1, 1996.

Item XXI--Allowability of Costs (DFARS Case 95-D309)

    The interim rule published as Item XVII of DAC 91-10 is converted 
to a final rule with minor clarifying revisions at DFARS 231.205-6. The 
rule implements Section 8122 of the Fiscal Year 1996 Defense 
Appropriations Act (Pub. L. 104-61). Section 8122 prohibits DoD from 
using fiscal year 1996 funds to reimburse a contractor for costs paid 
to an employee for a bonus or other payment in excess of the normal 
salary paid to the employee, when such payment is part of restructuring 
costs associated with a business combination.

Item XXII--Restructuring Costs Under Defense Contracts (DFARS Case 
94-D316)

    This final rule was issued by Departmental Letter 96-006, effective 
April 18, 1996 (61 FR 16881, April 18, 1996). The rule amends DFARS 
231.205-70 and 242.1204 to finalize the interim rule which was 
published as Item XXIII of DAC 91-7 and which implements Section 818 of 
the Fiscal Year 1995 Defense Authorization Act (Pub. L. 103-337). 
Section 818 restricts DoD from reimbursing external restructuring costs 
associated with a business combination undertaken by a defense 
contractor unless certain conditions are met.

Item XXIII--Cost Reimbursement Rules for Indirect Costs (DFARS Case 
96-D303)

    This interim rule was issued by Departmental Letter 96-011, 
effective May 13, 1996 (61 FR 21973, May 13, 1996). The rule adds a new 
section at DFARS 231.205-71 to implement Section 808 of the Fiscal Year 
1996 Defense Authorization Act (Pub. L. 104-106). Section 808 permits 
DoD to enter into a defense capability preservation agreement with a 
defense contractor where it would facilitate the achievement of the 
policy objectives relating to defense reinvestment, diversification, 
and conversion set forth

[[Page 50450]]

in 10 U.S.C. 2501(b), Such an agreement would permit the contractor to 
claim certain indirect costs, attributable to its private sector work, 
on its defense contracts.

Item XXIV--Determination of Need (DFARS Case 96-D012)

    This final rule revises DFARS 232.803(d) to reflect (1) the 
amendments made to FAR Subpart 32.8 in Item III of FAC 90-38; and (2) 
the May 10, 1996, determination by the Director of Defense Procurement 
that a need exists for DoD to agree not to reduce or set off any money 
due or to become due under a contract when the proceeds under the 
contract have been assigned in accordance with the Assignment of Claims 
provision of the contract.

Item XXV--Manufacturing Technology Program (DFARS Case 96-D313)

    This final rule amends DFARS 235.006 to implement a portion of 
Section 276 of the Fiscal Year 1996 Defense Authorization Act (Pub. L. 
104-106). Section 276 changes the name of the Manufacturing Science and 
Technology Program to the ``Manufacturing Technology Program,'' and 
permits contracts under the program to be on other than a cost-sharing 
basis if the contract is for a program to be carried out by an 
institution of higher education.

Item XXVI--Direct Submission of Vouchers to Disbursing Office (DFARS 
Case 96-D007)

    This final rule was issued by Departmental Letter 96-013, effective 
May 21, 1996 (61 FR 25409, May 21, 1996). The rule amends DFARS 242.803 
to permit contract auditors to authorize direct submission of interim 
vouchers for provisional payment to the disbursing office, for 
contractors with approved billing systems.

Item XXVII--Requirements for Cost/Schedule Status Report (DFARS Case 
95-D042)

    This final rule amends DFARS Subpart 242.11 to update references 
and guidance pertaining to contractor reporting requirements. DoDI 
7000.10, Contract Cost Performance, Funds Status and Cost/Schedule 
Status Reports, has been canceled and replaced by DoD 5000.2-R, 
Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and 
Major Automated Information System (MAIS) Acquisition Programs, dated 
March 15, 1996.

Item XXVIII--Material Management and Accounting System Changes (DFARS 
Case 95-D029)

    This final rule amends DFARS Subpart 242.72 and 252.242-7004 to (1) 
increase the dollar thresholds at which large business contractors are 
subject to material management and accounting system (MMAS) disclosure, 
demonstration, and maintenance requirements; (2) clarify the 
circumstances under which MMAS disclosure and demonstration are 
required; and (3) clarify requirements for contractor use of a ``loan/
pay-back'' technique for accomplishing material transactions.

Item XXIX--Contractor Purchasing System Reviews (DFARS Case 95-
D026)

    This final rule removes the procedures for contractor purchasing 
system reviews at DFARS 244.303 and Appendix C, to provide agencies 
maximum flexibility in conducting such reviews.

Item XXX--Ground and Flight Risk (DFARS Case 95-D028)

    This final rule amends DFARS 252.228-7001 and 252.228-7002 to (1) 
specify that the Government's assumption of risk of aircraft does not 
extend to damage, loss, or destruction sustained during flight, if the 
flight crew members have not been approved by an authorized Government 
flight representative; (2) increase; from $1,000 to $25,000, the 
contractor's liability for aircraft loss or damage not sustained during 
flight; and (3) clarify language pertaining to aircraft which is 
damaged, lost, or destroy prior to delivery and acceptance by the 
Government.

Editorial Revisions

    (1) DFARS 201.201-1(d)(i) is amended to update the DAR Council 
datafax number.
    (2) DFARS 202.101 is amended under the heading ``Army'' to revise 
the name ``Strategic Defense Command'' to read ``Space and Strategic 
Defense Command.''
    (3) DFARS 202.101 is amended under the heading ``Navy'' to revise 
the title ``Deputy, Acquisition Policy, Integrity and Accountability'' 
to read ``Deputy, Acquisition and Business Management.''
    (4) DFARS is amended to reflect the change in name of the 
``Advanced Research Projects Agency'' to the ``Defense Advanced 
Research Projects Agency'' and the change in name of the ``Defense 
Nuclear Agency'' to the ``Defense Special Weapons Agency.''
    (5) DFARS 207.105 is amended to update references and to conform to 
the current numbering of FAR 7.105.
    (6) DFARS 215.605 is amended to conform to the current numbering of 
FAR 15.605.
    (7) DFARS 227.7009-1 is amended to update FAR references.
    (8) DFARS 231.205-71 is amended to remove the title ``Assistant 
Secretary of Defense for Economic Security'' and insert in its place 
the title ``Deputy Under Secretary of Defense for Industrial Affairs 
and Installations.''
    (9) DFARS 239.7501-2 is amended to update statutory references.
    (10) DFARS 253.204-70(c)(4)(ix)(B)(9) is amended to revise the FAR 
reference.
    (11) DFARS Part 253 is amended to update DD Forms 882 and 2139. 
(This amendment is being made only in the loose-leaf edition of the 
DFARS.)
    (12) DFARS Appendix G is amended to update activity names and 
addresses.
    (13) DFARS Appendix I is amended in I-102(a) and (b) and I-103(a) 
by revising the date ``September 30, 1995'' to read ``September 30, 
1996.''

Interim Rules Adopted as Final Without Change

PARTS 223 AND 252--[AMENDED]

    The interim rule that was published at 57 FR 32736 on July 23, 
1992, and amended at 60 FR 61597 on November 30, 1995, is adopted as 
final without change.

PART 225--[AMENDED]

    The interim rule that was published at 61 FR 18987 on April 30, 
1996, is adopted as final without change.

PARTS 225 AND 252--[AMENDED]

    The interim rule that was published at 61 FR 13106 on March 26, 
1996, is adopted as final without change.

Interim Rules Adopted as Final With Changes

PART 207--[AMENDED]

    The interim rule that was published at 61 FR 16879 on April 18, 
1996, is adopted as final with an amendment at section 207.470.

PARTS 225 AND 252--[AMENDED]

    The interim rule that was published at 61 FR 10899 on March 18, 
1996, is adopted as final with revisions at sections 225.7001, 
225.7019-2, 225.7019-3, and 252.225-7016.

PART 231--[AMENDED]

    The interim rule that was published at 61 FR 7077 on February 26, 
1996, is

[[Page 50451]]

adopted as final with amendments at section 231.205-6.

List of Subjects in 48 CFR Parts 201, 202, 204, 206, 207, 209, 212, 
214, 215, 219, 223, 225, 227, 228, 231, 232, 235, 239, 242, 244, 249, 
250, 252, 253

    Government procurement.

Amendments to 48 CFR Chapter 2 (Defense Federal Acquisition Regulation 
Supplement)

    48 CFR Chapter 2 (the Defense Federal Acquisition Regulation 
Supplement) is amended as set forth below.
    1. The authority citation for 48 CFR Parts 201, 202, 204, 206, 207, 
209, 212, 214, 215, 219, 223, 225, 227, 228, 231, 232, 235, 239, 242, 
244, 249, 250, 252, 253, and Appendices B, C, B, and I to subchapter I 
continues to read as follows:

    Authority: 41 U.S.C. 421 and 48 CFR Chapter 1.

PART 201--FEDERAL ACQUISITION REGULATIONS SYSTEM

    2. Section 201.201-1 is amended by revising the introductory text 
of paragraph (d)(i), and paragraph (d)(i)(III) to read as follows:

201.201-1   The two councils.

* * * * *
    (d)(i) Departments and agencies process proposed revisions of FAR 
or DFARS through channels to the Director of the DAR Council. Process 
the proposed revision as a memorandum in the following format, 
addressed to the Director, DAR Council, OUSD(A&T), 3062 Defense 
Pentagon, Washington, DC 20301-3062; datafax (703) 602-0350:
* * * * *
    III. Discussion: Include a complete, convincing explanation of 
why the change is necessary and how the recommended revision will 
solve the problem. Address advantages and disadvantages of the 
proposed revision, as well as any cost or administrative impact on 
Government activities and contractors. Identify any potential impact 
of the change on automated systems, e.g., automated financial and 
procurement systems. Provide any other background information that 
would be helpful in explaining the issue.
* * * * *
    3. Section 201.402 is amended by revising paragraph (2) to read as 
follows:

201.402   Policy.

* * * * *
    (2) Individual deviations.
    (i) Except as provided in paragraph (2)(ii) of this section, 
individual deviations, other than those in paragraph (1)(i) of this 
section, must be approved in accordance with the department/agency plan 
prescribed by 201.304(4).
    (ii) Contracting officers outside the United States are authorized 
to deviate from prescribed non-statutory FAR and DFARS clauses when 
contracting for support services, supplies, or construction, with the 
governments of North Atlantic Treaty Organization (NATO) countries or 
other allies (as described in 10 U.S.C. 2341(2)), or with United 
Nations or NATO organizations. This authority shall be exercised only 
if such governments or organizations will not agree to the standard 
clauses.
* * * * *

PART 202--DEFINITIONS OF WORDS AND TERMS

202.101   [Amended]

    4. Section 202.101 is amended by revising under the heading 
``ARMY'' the phrase ``Strategic Defense Command'' to read ``Space and 
Strategic Defense Command''; by revising under the heading ``NAVY'' the 
phrase ``Deputy, Acquisition Policy, Integrity and Accountability,'' to 
read ``Deputy, Acquisition and Business Management,''; by revising the 
heading ``ADVANCED RESEARCH PROJECTS AGENCY'' to read ``DEFENSE 
ADVANCED RESEARCH PROJECTS AGENCY''; by revising the heading ``DEFENSE 
NUCLEAR AGENCY'' to read ``DEFENSE SPECIAL WEAPONS AGENCY''; by 
revising under the newly revised heading ``DEFENSE SPECIAL WEAPONS 
AGENCY'' the phrase ``Headquarters, Defense Nuclear Agency'' to read 
``Headquarters, Defense Special Weapons Agency''; and by revising in 
the definition of Departments and agencies the phrases ``Advanced 
Research Projects Agency'' and ``Defense Nuclear Agency'' to read 
``Defense Advanced Research Projects Agency'' and ``Defense Special 
Weapons Agency'', respectively.

PART 204--ADMINISTRATIVE MATTERS

204.7003   [Amended]

    5. Section 204.7003 is amended in paragraph (a)(1)(i)(F) by 
revising the phrase ``Defense Nuclear Agency--DNA'' to read ``Defense 
Special Weapons Agency--DSWA''.

PART 206--COMPETITION REQUIREMENTS

    6. Section 206.304 is amended by revising paragraph (a)(4)(B)(2) to 
read as follows:

206.304   Approval of the justification.

    (a)(4) * * *
    (B) * * *
    (2) If a civilian, is serving in a position with a grade under the 
General Schedule (or any other schedule for civilian officers or 
employees) that is comparable to or higher than the grade of major 
general or rear admiral.

PART 207--ACQUISITION PLANNING

207.103   [Amended]

    7. Section 207.103 is amended in paragraph (h)(i)(B) by revising 
the phrase ``to the extent prescribed DoDD 5000.1'' to read ``to the 
extent prescribed by DoDD 5000.1''.
    8. Section 207.104 is added to read as follows:

207.104   General procedures.

    (b) The planner should forward the requirements information to the 
contract administration organization when assistance in identification 
of potential sources of supply is necessary, when an existing contract 
is being modified or resolicited, or when contract administration 
resource requirements will be affected.
    9. Section 207.105 is amended by revising the introductory text; in 
paragraph (a)(8) by removing the reference ``DoDI 5000.2, Defense 
Acquisition Management Policies and Procedures'' and inserting in its 
place ``DoD 5000.2-R, Mandatory Procedures for Major Defense 
Acquisition Programs (MDAPs) and Major Automated Information System 
(MAIS) Acquisition Programs''; by redesignating paragraphs (b) (12), 
(15), and (17) as paragraphs (b) (13), (16), and (18), respectively; in 
newly designated paragraph (b)(13)(iv) by removing the reference ``DoDI 
5000.2, Defense Acquisition Management Policies and Procedures'' and 
inserting in its place ``DoD 5000.2-R, Mandatory Procedures for Major 
Defense Acquisition Programs (MDAPs) and Major Automated Information 
System (MAIS) Acquisition Programs''; in newly designated paragraph 
(b)(16) by revising the title to read ``Environmental and energy 
conservation objectives.''; in newly designated paragraph 
(b)(18)(A)(1)(ii) by removing the reference ``(b)(17)(A)(1)(i)'' and 
inserting ``(b)(18)(A)(1)(i)'' in its place; and by adding paragraph 
(b)(18)(D). The revised and added text reads as follows:

207.105   Contents of written acquisition plans.

    For acquisitions covered by 207.103(c)(i) (A) and (B), correlate 
the plan to the DoD Future Years Defense Program, applicable budget 
submissions, and the decision coordinating paper/program

[[Page 50452]]

memorandum, as appropriate. It is incumbent upon the planner to 
coordinate the plan with all those who have a responsibility for the 
development, management, or administration of the acquisition. The 
acquisition plan should be provided to the contract administration 
organization to facilitate resource allocation and planning for the 
evaluation, identification, and management of contractor performance 
risk.
 * * * * *
    (b) * * *
    (18) * * *
    (D) Contract administration. Discuss the level of Government 
administration anticipated or currently performed and any change 
proposed by the contract administration office.
    10. Section 207.470 is amended by revising paragraph (b) to read as 
follows:

207.470   Statutory requirements.

 * * * * *
    (b) Leasing of commercial vehicles and associated equipment. Except 
as provided in paragraph (a) of this section, the contracting officer 
may use leasing in the acquisition of commercial vehicles and 
associated equipment whenever the contracting officer determines that 
leasing of such vehicles is practicable and efficient (10 US.C. 2401a).

PART 209--CONTRACTOR QUALIFICATIONS

    11. Section 209.103 is amended by adding paragraph (c) to read as 
follows:

209.103  Policy.

* * * * *
    (c) The additional cost of contract administration and audit due to 
a contractor's performance risk may be considered in evaluating the 
contractor's price.

209.103-70  [Amended]

    11a. Section 209.103-70 is amended by removing the phrase ``in FAR 
part 13''.

209.403  [Amended]

    12. Section 209.403 is amended in paragraph (1) by revising the 
phrase ``Advanced Research Projects Agency--The Director'' to read 
``Defense Advanced Research Projects Agency--The Director''; and by 
revising the phrase ``Defense Nuclear Agency--The Director'' to read 
``Defense Special Weapons Agency--The Director''.

PART 212--ACQUISITION OF COMMERCIAL ITEMS

212.301  [Amended]

    13. Section 212.301 amended by removing paragraph (f)(i) and 
redesignating paragraphs (f)(ii) through (f)(iv) as paragraphs (f)(i) 
through (f)(iii), respectively. Newly designated paragraph (f)(ii) is 
amended in the first sentence by removing the phrase ``in FAR part 
13''.

PART 214--SEALED BIDDING

214.406-3  [Amended]

    14. Section 214.406-3 is amended in paragraph (e)(i) by revising 
the phrase ``Advanced Research Projects Agency:'' to read ``Defense 
Advanced Research Projects Agency:'', and by revising the abbreviation 
``ARPA'' to read ``DARPA''; and in paragraph (e)(vi) by revising the 
phrase ``Defense Nuclear Agency:'' to read ``Defense Special Weapons 
Agency:'' and by revising the abbreviation ``DNA'' to read ``DSWA''.

PART 215--CONTRACTING BY NEGOTIATION

    15. Section 215.605 is amended by revising paragraph (b) to read as 
follows:

215.605  Evaluation factors and subfactors.

    (b)(2)(A) In acquisitions which require use of the clause at FAR 
52.219-9, Small, Small Disadvantaged and Women-Owned Small Business 
Subcontracting Plan, the extent of participation of small and small 
disadvantaged business in performance of the contact shall be addressed 
in source selection.
    (1) For acquisitions other than those based only on cost or price 
competition, the contracting officer shall evaluate the extent to which 
offerors identify and commit to small business and to small 
disadvantaged business, historically black college and university, or 
minority institution performance of the contract, whether as a joint 
venture, teaming arrangement, or subcontractor.
    (2) Criteria for evaluation may include--
    (i) The extent which such firms are specifically identified in 
proposals;
    (ii) The extent of commitment to use such firms (for example, 
enforceable commitments are to be weighted more heavily than non-
enforceable ones);
    (iii) The complexity and variety of the work small firms are to 
perform;
    (iv) The realism of the proposal;
    (v) When not otherwise required by 215.608(a)(2), past performance 
of the offerors in complying with requirements of the clauses at FAR 
52.219-8, Utilization of Small, Small Disadvantaged and Women-Owned 
Small Business Concerns, and 52.219-9, Small, Small Disadvantaged and 
Women-Owned Small Business Subcontracting Plan; and
    (vi) The extent of participation of such firms in terms of the 
value of the total acquisition.
    (3) Proposals addressing the extent of small and small 
disadvantaged business performance may be separate from subcontracting 
plans submitted pursuant to the clause at FAR 52.219-9 and should be 
structured to allow for consideration of offers from small businesses.
    (4) When an evaluation includes the criterion in paragraph 
(b)(2)(A)(2)(i) of this section, the small, small disadvantaged, or 
women-owned small businesses considered in the evaluation shall be 
listed in any subcontracting plan submitted pursuant to FAR 52.219-9 to 
facilitate compliance with 252.219-7003(g).
    (B) The costs or savings related to contract administration and 
audit may be considered when the offeror's past performance or 
performance risk is likely to result in significant costs or savings.
* * * * *

PART 219--SMALL BUSINESS PROGRAMS

    16. Subpart 219.7 is amended by revising the title to read as 
follows:

Subpart 219.7--Subcontracting with Small Business, Small 
Disadvantaged Business and Women-Owned Small Business Concerns

    17. Section 219.7201 is amended by revising the second sentence to 
read as follows:

219.7201  Administration of the test program.

    * * * The focal point for the test program is the Director, Small 
and Disadvantaged Business Utilization (SADBU), Office of the Deputy 
Under Secretary of Defense (International and Commercial Programs). * * 
*

PART 223--ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-
FREE WORKPLACE

    18. Subpart 223.8 is added to read as follows:

Subpart 223.8--Ozone-Depleting Substances

223.803  Policy.

    Section 211.271, Elimination of use of class I ozone-depleting 
substances,

[[Page 50453]]

places restrictions on award or modification of DoD contracts requiring 
the use of class I ozone-depleting substances. These restrictions are 
in addition to any imposed by the Clean Air Act and apply after June 1, 
1993, to all DoD contracts, regardless of place of performance.

PART 225--FOREIGN ACQUISITION

225.403  [Amended]

    19. Section 225.403 is amended in paragraph (d)(1)(B) (3) by 
inserting the work ``Subpart'' immediately before the reference 
``225.71''.
    20. Subpart 225.9 is added to read as follows:

Subpart 225.9--Additional Foreign Acquisition Clauses

225.970  Clause deviations in overseas contracts.

    See 201.402(2) for approval authority for clause deviations in 
overseas contracts with governments of North Atlantic Treaty 
Organization (NATO) countries or other allies or with United Nations or 
NATO organizations.
    21. Section 225.7001 is amended by revising paragraph (a) to read 
as follows:

225.7001  Definitions.

* * * * *
    (a) Bearing components and miniature and instrument ball bearings 
are defined in the clause at 252.225-7016, Restriction on Acquisition 
of Ball and Roller Bearings.
* * * * *
    22. Section 225.7002-2 is amended by revising paragraphs (e) and 
(f) to read as follows:

225.7002-2  Exceptions.

* * * * *
    (e) Acquisitions using simplified acquisition procedures.
    (f) Acquisitions of end items incidentally incorporating cotton or 
wool, for which the estimated value of the cotton or wool is not more 
than 10 percent of the total price of the end item; provided the 
estimated value of the cotton or wool does not exceed the simplified 
acquisition threshold.
* * * * *
    23. Section 225.7002-3 is revised to read as follows:

225.7002-3  Contract clauses.

    Unless an exception is known to apply--
    (a) Use the clause at 252.225-7012, Preference for Certain Domestic 
Commodities, in all solicitations and contracts which meet or exceed 
the simplified acquisition threshold.
    (b) Use the clause at 252.225-7014, Preference for Domestic 
Specialty Metals, in all solicitations and contracts over the 
simplified acquisition threshold that require delivery of an article 
containing specialty metals. Use the clause with its Alternate I in all 
solicitations and contracts over the simplified acquisition threshold 
requiring delivery, for one of the following major programs, of an 
article containing specialty metals--
    (1) Aircraft;
    (2) Missile and space systems;
    (3) Ships;
    (4) Tank-automotive;
    (5) Weapons; or
    (6) Ammunition.
    (c) Use the clause at 252.225-7015, Preference for Domestic Hand or 
Measuring Tools, in all solicitations and contracts over the simplified 
acquisition threshold calling for delivery of hand or measuring tools.

225.7002-4  [Removed]

    24. Section 225.7002-4 is removed.

225.7011-4  [Amended]

    25. Section 225.7011-4 is amended in the introductory text of 
paragraph (b) by removing the phrase ``The Pentagon'' and inserting in 
its place the phrase ``7100 Defense Pentagon''

225.7012-3  [Amended]

    26. Section 225.7012-3 is amended by revising the section title to 
read ``Contract clause.'' and by redesignating paragraphs (1) and (2) 
as paragraphs (a) and (b), respectively.
    27. Section 225.7019-2 is revised to read as follows:

225.7019-2  Exceptions.

    (a) The restriction in 225.7019-1(a) does not apply to--
    (1) Acquisitions using simplified acquisition procedures, unless 
ball or roller bearings or bearing components are the end items being 
purchased;
    (2) Purchases of commercial items incorporating ball or roller 
bearings;
    (3) Miniature and instrument ball bearings when necessary to meet 
urgent military requirements;
    (4) Items acquired overseas for use overseas; or
    (5) Ball and roller bearings or bearing components or items 
containing bearings for use in a cooperative or co-production project 
under an international agreement. This exception does not apply to 
miniature and instrument ball bearings.
    (b) The restriction in 225.7019-1(b) does not apply to contracts 
for acquisition of commercial items or subcontracts for acquisition of 
commercial items or subcontracts for acquisition of commercial items or 
commercial components (see 212.503(a)(xi) and 212.504(a)(xxxvi)).
    28. Section 225.7019-3 is amended by revising the introductory text 
of paragraph (a)(2) and adding paragraph (a)(3) to read as follows:

225.7019-3  Waiver.

    (a) * * *
    (2) For multiyear contracts or contracts exceeding 12 months, 
except those for miniature and instrument ball bearings, only if--
* * * * *
    (3) For miniature and instrument ball bearings, only if the 
contractor agrees to acquire a like quantity and type of domestic 
manufacture for nongovernmental use.
* * * * *
    29. Sections 225.7102, 225.7103, and 225.7104 are revised to read 
as follows:

225.7102  Policy.

    DoD requirements for the following forging items, whether as end 
items or components, shall be acquired from domestic sources (as 
described in the clause at 252.225-7025) to the maximum extent 
practicable--

------------------------------------------------------------------------
                   Items                             Categories         
------------------------------------------------------------------------
Ship propulsion shafts....................  Excludes service and landing
                                             craft shafts.              
Periscope tubes...........................  All.                        
Ring forgings for bull gears..............  All greater than 120 inches 
                                             in diameter.               
------------------------------------------------------------------------

225.7103  Exceptions.

    The policy in 225.7102 does not apply to acquisitions--
    (a) Using simplified acquisition procedures, unless the restricted 
item is the end item being purchased;
    (b) Overseas for overseas use; or
    (c) When the quantity acquired exceeds the amount needed to 
maintain the U.S. defense mobilization base (provided such quantity is 
an economical purchase quantity). The restriction to domestic sources 
does not apply to the quantity above that required to maintain the 
base, in which case, qualifying country sources may compete.

225.7104  Waiver.

    Upon request from a prime contractor, the contracting officer may 
waive the requirement for domestic manufacture of the items covered by 
the policy in 225.7102.

225.7303  [Amended]

    30. Section 225.7303 is amended in the title by removing the 
abbreviation

[[Page 50454]]

``(FMS)''; in the first sentence by revising the phrase ``foreign 
military sale'' to read ``FMS''; and in the second sentence by revising 
the phrase ``a foreign military sale'' to read ``an FMS''.

PART 227--PANTENTS, DATA, AND COPYRIGHTS

227.7004  [Amended]

    31. Section 227.7004 is amended in paragraph (c)(6) by revising the 
phrase ``Defense Nuclear Agency'' to read ``Defense Special Weapons 
Agency''.

227.7009-1  [Amended]

    32. Section 227.7009-1 is amended by removing paragraph (a); by 
redesignating paragraphs (b) through (f) as paragraphs (a) through (e), 
respectively; and in newly designated paragraph (d) by revising the 
reference ``FAR 33.014'' to read ``FAR subpart 33.2''.

PART 228--BONDS AND INSURANCE

228.171, 228.171-1, 228.171-2, and 228.171-3  [Removed]

    33. Sections 228.171, 228.171-1, 228.171-2, and 228.171-3 are 
removed.

228.311-1  [Removed]

    34. Section 228.311-1 is removed.

228.311-2  [Redesignated]

    35. Section 228.311-2 is redesignated as 228.311-1.
    36. Section 228.370 is amended by revising the title to read as 
follows:

228.370  Additional clauses.

PART 231--CONTRACT COST PRINCIPLES AND PROCEDURES

    37. Section 231.205-6 is amended in paragraph (a)(2) by revising 
the parenthetical phrase to read ``(Section 8117 of Pub. L. 103-335)'' 
and in paragraph (f)(1) by revising the first sentence to read as 
follows:

231.205-6  Compensation for personal services.

* * * * *
    (f)(1) Costs for bonuses or other payments in excess of the normal 
salary paid by the contractor to an employee, that are part of 
restructuring costs associated with a business combination, are 
unallowable under DoD contracts funded by fiscal year 1996 
appropriations (Section 8122 of Pub. L. 104-61). * * *

231.205-70  [Amended]

    38. Section 231.205-70 is amended in paragraph (d)(2) by removing 
the phrase ``paragraph (c)(1)(iv) of this subsection'' and inserting 
``231.205-70(c)(1)(iv)'' in its place.

231.205-71  [Amended]

    39. Section 231.205-71 is amended in paragraph (b) by removing the 
phrase ``Assistant Secretary of Defense for Economic Security'' and 
inserting in its place the phrase ``Deputy Under Secretary of Defense 
for Industrial Affairs and Installations''.

PART 232--CONTRACT FINANCING

    40. Section 232.803 is amended by revising paragraph (d) to read as 
follows:

232.803  Policies.

* * * * *
    (d) Pursuant to Section 3737(e) of the Revised Statutes (41 U.S.C. 
15), and in accordance with Presidential delegation dated October 3, 
1995, Secretary of Defense delegation dated February 5, 1996, and Under 
Secretary of Defense for Acquisition and Technology delegation dated 
February 23, 1996, the Director of Defense Procurement determined on 
May 10, 1996, that a need exists for DoD to agree not to reduce or set 
off any money due or to become due under the contract when the proceeds 
under the contract have been assigned in accordance with the Assignment 
of Claims provision of the contract. This determination was published 
in the Federal Register on June 11, 1996, as required by law. 
Nevertheless, if departments/agencies decide it is in the Government's 
interests, or if the contracting officer makes a determination in 
accordance with FAR 32.803(d) concerning a significantly indebted 
offeror, they may exclude the no-setoff commitment.

PART 235--RESEARCH AND DEVELOPMENT CONTRACTING

    41. Section 235.006 is amended by revising paragraphs (a) and 
(b)(iv) to read as follows:

235.006  Contracting methods and contract type.

    (a) All contracts under the Manufacturing Technology Program (see 
DoDI 4200.15, Manufacturing Technology Program) shall be awarded using 
competitive procedures (10 U.S.C. 2525).
    (b) * * *
    (iv) A cost-sharing arrangement (see FAR 16.303) must be used for 
contracts awarded in support of the Manufacturing Technology Program, 
unless an alternative is approved by the Secretary of Defense (10 
U.S.C. 2525). Approval by the Secretary of Defense to use other than a 
cost-sharing arrangement for the Manufacturing Technology Program must 
be based on a determination that the contract is for a program that--
    (A) Is not likely to have any immediate and direct commercial 
application;
    (B) Is of sufficiently high risk to discourage cost sharing by non-
Federal Government sources; or
    (C) Will be carried out by an institution of higher education.

235.7002  [Amended]

    42. Section 235.7002 is amended in paragraph (a)(4) by revising the 
phrase ``Defense Nuclear Agency'' to read ``Defense Special Weapons 
Agency''.

235.7003  [Amended]

    43. Section 235.7003 is amended in paragraph (b)(4)(ii) by revising 
the phrase ``Defense Nuclear Agency:'' to read ``Defense Special 
Weapons Agency:''; and by revising the phrase ``Acquisition Management 
Office'' to read `'Acquisition Management Directorate''.

PART 239--ACQUISITION OF INFORMATION RESOURCES

    44. Section 239.7501-2 is revised to read as follows:

239.7501-2  Restriction.

    Section 8028 of the FY 1992 Defense Appropriations Act (Pub. L. 
102-172) and similar sections of the FY 1993, FY 1994, and FY 1995 
Defense appropriations acts prohibit use of DoD appropriations for 
acquisition of major automated information systems, unless the systems 
have successfully completed oversight reviews required by DoD 
regulations.

PART 242--CONTRACT ADMINISTRATION

    45. Section 242.302 is amended in paragraph (a)(19) by revising the 
reference `'252.225-7008'' to read ``252.225-7009'' and by adding 
paragraph (a)(67) to read as follows:

242.302  Contract administration functions.

    (a) * * *
    (67) Also support program offices and buying activities in 
precontractual efforts leading to a solicitation or award.
* * * * *

242.803  [Amended]

    46. Section 242.803 is amended at the end of paragraph (b)(i)(C) by 
changing the period to a semicolon.
    47. Section 242.1106 is amended by revising paragraph (a)(i) to 
read as follows:

242.1106  Reporting requirements.

    (a) * * *

[[Page 50455]]

    (i) DoD 5000.2-R, Mandatory Procedures for Major Defense 
Acquisition Programs (MDAPs) and Major Automated Information System 
(MAIS) Acquisition Programs; and
* * * * *
    48. Section 242.1107-70 is revised to read as follows:

242.1107-70  Additional clauses.

    When cost/schedule status reporting (C/SSR) is required on 
acquisitions for other than major systems (i.e., the Contract Data 
Requirements List includes DI-MGMT-81467), use in solicitations and 
resulting contracts the clause at 252.242-7005, Cost/Schedule Status 
Report.
    49. Section 242.7202 is amended by revising paragraph (d) to read 
as follows:

242.7202  Policy.

* * * * *
    (d) Conforms to the standards at 252.242-7004(f) when the 
contractor has cost-reimbursement or fixed-price contracts exceeding 
the simplified acquisition threshold, with progress or other contract 
financing provisions, except when all of the contracts and subcontracts 
are awarded under the set-aside or Section 8(a) procedures of FAR part 
19.
    50. Section 242.7203 is revised to read as follows:

242.7203  MMAS disclosure, demonstration, and maintenance requirements.

    (a) A large business contractor is subject to MMAS disclosure, 
demonstration, and maintenance if in its preceding fiscal year the 
contractor received DoD prime contracts or subcontracts (including 
modifications) totaling--
    (1) $70 million or more; or
    (2) $30 million or more (but less than $70 million), and the 
contracting officer determines it to be in the best interests of the 
Government (e.g., contractor disclosure, demonstration, or other 
activities indicate significant MMAS problems exist).
    (b) After the administrative contracting officer determines the 
contractor's MMAS is adequate (see 242.7204(b)), written disclosure 
will not be required for the next MMAS review unless the contractor's 
policies, procedures, or practices have changed in the interim 
period(s). Similarly, once the contractor demonstrates that its MMAS 
contains no significant deficiencies, demonstration requirements for 
subsequent reviews may be satisfied if internal audits are reasonably 
current and contain sufficient transaction tests to demonstrate MMAS 
compliance with each standard.

242.7204  [Amended]

    51. Section 242.7204 is amended in paragraph (a)(1) by revising the 
reference ``242.7203'' to read ``242.7203(a)''; and in paragraph (a)(2) 
by revising the reference ``242.7203(b)'' to read ``242.7203(a)(2)''.

242.7206  [Amended]

    52. Section 242.7206 is amended in the introductory text by 
removing the phrase ``in FAR part 13''.

PART 244--SUBCONTRACTING POLICIES AND PROCEDURES

244.303  [Removed]

    53. Section 244.303 is removed.

244.304  [Amended]

    54. Section 244.304 is amended in the introductory text of 
paragraph (b) by removing the abbreviation ``PSA'' and inserting in its 
place the phrase ``purchasing system analyst (PSA)''.

PART 249--TERMINATION OF CONTRACTS

249.7001  [Amended]

    55. Section 249.7001 is amended in paragraph (b)(4) by revising the 
phrase ``Advanced Research Projects Agency--CMO'' to read ``Defense 
Advanced Research Projects Agency--CMO''; and in paragraph (b)(9) by 
revising the phrase ``Defense Nuclear Agency--Chief, Office of 
Procurement, OATR'' to read ``Defense Special Weapons Agency--
Acquisition Management Directorate (AM)''.

PART 250--EXTRAORDINARY CONTRACTUAL ACTIONS

250.303  [Amended]

    56. Section 250.303 is amended in paragraph (5) by revising the 
phrase ``Advanced Research Projects Agency--'' to read ``Defense 
Advanced Research Projects Agency--''; and in paragraph (10) by 
revising the phrase ``Defense Nuclear Agency--'' to read ``Defense 
Special Weapons Agency--'', by revising the abbreviation ``DNA'' to 
read ``DSWA'', and by revising the abbreviation ``OAPR'' to read 
``AM''.

PART 252--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

252.212-7000  [Amended]

    57. Section 252.212-7000 is amended in the introductory text by 
revising the reference ``212.301(f)(iii)'' to read ``212.301(f)(ii)''.

252.212-7001  [Amended]

    58. Section 252.212-7001 is amended in the introductory text by 
revising the reference ``212.301(f)(iv)'' to read ``212.301(f)(iii)''.

252.225-7012  [Amended]

    59. Section 252.225-7012 is amended in the introductory text by 
revising the reference ``225.7002-4(a)'' to read ``225.7002-3(a)''.

252.225-7013  [Removed and Reserved]

    60. Section 252.225-7013 is removed and reserved.

252.225-7014  [Amended]

    61. Section 252.225-7014 is amended in the introductory text by 
revising the reference ``225.7002-4(c)'' to read ``225.7002-3(b)''; and 
in the introductory text of ALTERNATE I by revising the reference 
``225.7002-4(c)'' to read ``225.7002-3(b)''.

252.225-7015  [Amended]

    62. Section 252.225-7015 is amended in the introductory text by 
revising the reference ``225.7002-4(d)'' to read ``225.7002-3(c)''.
    63. Section 252.225-7016 is revised to read as follows:

252.225-7016  Restriction on Acquisition of Ball and Roller Bearings.

    As prescribed in 225.7019-4, use the following clause:

Restriction on Acquisition of Ball and Roller Bearings (Sep 1996)

    (a) Definitions.
    As used in this clause--
    (1) ``Bearing components'' means the bearing element, retainer, 
inner race, or outer race.
    (2) ``Miniature and instrument ball bearings'' means all rolling 
contact ball bearings with a basic outside diameter (exclusive of 
flange diameters) of 30 millimeters or less, regardless of material, 
tolerance, performance, or quality characteristics.
    (b) The Contractor agrees that all ball and roller bearings and 
ball and roller bearing components (including miniature and 
instrument ball bearings) delivered under this contract, either as 
end items or components of end items, shall be wholly manufactured 
in the United States or Canada. Unless otherwise specified, raw 
materials, such as preformed bar, tube, or rod stock and lubricants, 
need not be mined or produced in the United States or Canada.
    (c) The restriction in paragraph (b) of this clause does not 
apply to the extent that the end items or components containing ball 
or roller bearings are commercial items. The commercial item 
exception does not include items designed or developed under a 
Government contract or contracts where the end item is bearings and 
bearing components.
    (d) The restriction in paragraph (b) of this clause may be 
waived upon request from the

[[Page 50456]]

Contractor in accordance with subsection 225.7019-3 of the Defense 
Federal Acquisition Regulation Supplement. If the restriction is 
waived for miniature and instrument ball bearings, the Contractor 
agrees to acquire a like quantity and type of domestic manufacture 
for nongovernmental use.
    (e) The Contractor agrees to retain records showing compliance 
with this restriction until 3 years after final payment and to make 
records available upon request of the Contracting Office.
    (f) The Contractor agrees to insert this clause, including this 
paragraph (f), in every subcontract and purchase order issued in 
performance of this contract, unless items acquired are--
    (1) Commercial items other than ball or roller bearings; or
    (2) Items that do not contain ball or roller bearings.

(End of clause)

    64. Section 252.225-7025 is revised to read as follows:

252.225-7025  Foreign Source Restrictions.

    As prescribed in 225.7105, use the following clause:

Foreign Source Restrictions (Sep 1996)

    (a) Definitions.
    As used in this clause--
    (1) Domestic manufacture means manufactured in the United States 
or Canada if the Canadian firm--
    (i) Normally produces similar items or is currently producing 
the item in support of DoD contracts (as prime or subcontractor); 
and
    (ii) Agrees to become (upon receiving a contract/order) a 
planned producer under DoD's Industrial Preparedness Program (IPP), 
if it is not already a planned producer for the item.
    (2) Forging items means--

------------------------------------------------------------------------
                   Items                             Categories         
------------------------------------------------------------------------
Ship propulsion shafts....................  Excludes service and landing
                                             craft shafts.              
Periscope tubes...........................  All.                        
Ring forgings for bull gears..............  All greater than 120 inches 
                                             in diameter.               
------------------------------------------------------------------------

    (b) The Contractor agrees that end items and their components 
delivered under this contract shall contain forging items that are 
of domestic manufacture only.
    (c) The restriction in paragraph (b) of this clause may be 
waived upon request from the Contractor in accordance with section 
225.7104 of the Defense Federal Acquisition Regulation Supplement.
    (d) The Contractor agrees to retain records showing compliance 
with this restriction until 3 years after final payment and to make 
records available upon request of the Contracting Officer.
    (e) The Contractor agrees to insert this clause, including this 
paragraph (e), in subcontracts and purchase orders issued in 
performance of this contract, when products purchased contain 
restricted forging items.

(End of clause)

    65. Section 252.228-7001 is amended by revising the clause date to 
read ``(SEP 1996)''; by revising paragraph (d)(2); in paragraph (e) by 
removing ``$1,000'' both places it appears and inserting ``$25,000'' in 
its places; in the introductory text of paragraph (h) by removing the 
phrase ``In the event the'' and inserting in its place the phrase ``In 
the event of''; and by revising paragraph (i)(1), the introductory text 
of paragraph (i)(2), and paragraph (k). The revised text reads as 
follows:

252.228-7001  Ground and flight risk.

* * * * *
    (d) * * *
    (2) Is sustained during flight if the flight crew members have 
not been approved in writing by the Government Flight 
Representative, who has been authorized in accordance with the 
combined regulation entitled ``Contractor's Flight and Ground 
Operations'' (Air Force Regulation 55-22, Army Regulation 95-20, 
NAVAIR Instruction 3710.1C, and Defense Logistics Agency Manual 
8210.1);
* * * * *
    (i) * * *
    (1) Require that the aircraft be replaced or restored by the 
Contractor to the condition immediately prior to the damage, in 
which event the Contracting Officer will make an equitable 
adjustment in the contract price and the time for contract 
performance; or
    (2) Terminate this contract with respect to the aircraft, in 
which event the Contractor shall be paid the contract price for the 
aircraft (or, if applicable, any work to be performed on the 
aircraft) less any amount the Contracting Officer determines--
* * * * *
    (k) The Contractor agrees to be bound by the operating 
procedures contained in the combined regulation entitled 
``Contractor's Flight and Ground Operations'' in effect on the date 
of contract award.

(End of clause)

    66. Section 252.228-7002 is amended by revising the clause date to 
read ``(SEP 1996)''; and by revising section title, the introductory 
text of paragraph (c), and paragraph (e) to read as follows:

252.228-7002  Aircraft flight risk.

* * * * *
    (c) Unless the flight crew members previously have been approved 
in writing by the Government Flight Representative, who has been 
authorized in accordance with the combined regulation entitled 
``Contractor's Flight and Ground Operations'' (Air Force Regulation 
55-22, Army Regulation 95-20, NAVAIR Instruction 3710.1C, and 
Defense Logistics Agency Manual 8210.1), the Contractor shall not 
be--
* * * * *
    (e) The Contractor agrees to be bound by the operating 
procedures contained in the combined regulation entitled 
``Contractor's Flight and Found Operations'' in effect on the date 
of contract award.

(End of clause)

252.228-7006 and 252.228-7007  [Removed]

    67. Sections 252.228-7006 and 252.228-7007 are removed.
    68. Section 252.242-7004 is amended by revising the clause date to 
read ``(SEP 1996)''; by adding paragraph (a)(3); and by revising 
paragraphs (c)(2)(i), (c)(2)(ii), (f)(7)(i), and (f)(7)(ii), and 
paragraph (f)(7)(iii) introductory text to read as follows:

252.242-7004   Material management and accounting system.

* * * * *
    (a) * * *
    (3) ``Contractor'' means a business unit as defined in section 
31.001 of the Federal Acquisition Regulation (FAR).
* * * * *
    (c) * * *
    (2) * * *
    (i) $70 million or more; or
    (ii) $30 million or more (but less than $70 million), and is 
notified in writing by the Contracting Officer that paragraphs (d) 
and (e) apply.
    (f) * * *
    (7) * * *
    (i) The Contractor shall maintain and disclose written policies 
describing the transfer methodology and the loan/pay-back technique.
    (ii) The costing methodology may be standard or actual cost, or 
any of the inventory costing methods in 48 CFR 9904.411-50(b). 
Consistency shall be maintained across all contract and customer 
types, and from accounting period to accounting period for initial 
charging and transfer charging.
    (iii) The system should transfer parts and associated costs 
within the same billing period. In the few instances where this may 
not be appropriate, the Contractor may accomplish the material 
transaction using a loan/pay-back technique. The ``loan/pay-back 
technique'' means that the physical part is moved temporarily from 
the contract, but the cost of the part remains on the contract. The 
procedures for the loan/pay-back technique must be approved by the 
Administrative Contracting Officer. When the technique is used, the 
Contractor shall have controls to ensure--
* * * * *

PART 253--FORMS

253.204-70  [Amended]

    69. Section 253.204-70 is amended in paragraph (c)(4)(ix)(B)(9) by 
revising the reference ``FAR 6.302-3(a)(2)(i)'' to read ``FAR 6.302-
3(a)(2)''.

Appendix B to Chapter 2--[Amended]

    70. Appendix B to Chapter 2 is amended in Part 5 by revising in the 
title the phrase ``DEFENSE NUCLEAR

[[Page 50457]]

AGENCY'' to read ``DEFENSE SPECIAL WEAPONS AGENCY''; and by revising 
the abbreviation ``DNA'' to read ``DSWA'' both places it appears.

Appendix C to Chapter 2--[Removed and Reserved]

    71. Appendix C to Chapter 2 is removed and reserved.

Appendix G to Chapter 2--[Amended]

    72. Appendix G to Chapter 2 is amended in Part 1, Section G-101, 
paragraph (c), by removing the address ``**Defense Nuclear Agency, 
Chief, Contract Division, Defense Nuclear Agency, Washington, DC 20305-
1000'' and inserting in its place the address ``**Defense Special 
Weapons Agency, Director, Acquisition Management Directorate, Defense 
Special Weapons Agency, 6801 Telegraph Road, Alexandria, VA 22310-
3398''.
    73. Appendix G to Chapter 2 is amended in Part 2 by revising entry 
DASG60-CB to read as follows:

PART 2--ARMY ACTIVITY ADDRESS NUMBERS

* * * * *
DASG60-CB
    USA Space and Strategic Defense Command, Deputy Commander, ATTN: 
CSSD-CM, P.O. Box 1500, Huntsville, AL 35807-3801
* * * * *
    74. Appendix G to Chapter 2 is amended in Part 3 by removing entry 
N66032--LK and the address that follows; by revising the entries for 
activity address numbers N00022, N31149, N52855, N61463, N62472, 
N66022, N66972, N67596, and N68409; and by adding entries for activity 
address numbers N00038, N0610A, N39088, N43636, N48984, N53863, N55105, 
N55271, N57092, N66101, N68317, N68326, N68389, N68482, N68573, and 
N68939. The revised and added text reads as follows:

PART 3--NAVY ACTIVITY ADDRESS NUMBERS

* * * * *
N00022--ML*, MQ*, NV*, MLZ
    Chief of Naval Personnel, Washington, DC 20370-2000
* * * * *
N00038 (MAJ00011)--LB-5
    U.S. Commander-in-Chief, Pacific, HQ Support Division, Box 64017, 
Code J145, Camp H.N. Smith, HI 96861-4017
* * * * *
N0610A (MAJ00062)--L98
    Commanding Officer, Naval Diving and Salvage Training Center, 350 
South Crag Road, Panama City, FL 32407-7016
* * * * *
N31149 (MAJ00024)--EHA-B
    Naval Sea Logistics Center Detachment, Philadelphia Naval Base, 
Philadelphia, PA 19112-5061
* * * * *
N39088 (MAJ00022)--NVF
    Navy Recruiting Orientation Unit, 206 South Avenue, Suite C, 
Pensacola, FL 32508-5102
* * * * *
N43646 (MAJ00023)--4JB
    Defense Printing Service, Detachment Branch Office, 5403 Southside 
Drive, Louisville, KY 40214
* * * * *
N48984 (MAJ00023)--L5E
    Defense Printing Service, Detachment Office, 901 South Drive, Scott 
Air Force Base, IL 62225-5106
* * * * *
N52855--LZ
    Special Boat Unit 11, FPO AP 96601-4517
* * * * *
N53863 (MAJ00060)--LHH
    Commander, Surface Warfare Development Group, 2200 Amphibious 
Drive, Norfolk, VA 23521-2850
* * * * *
N55105 (MAJ00060)--NMC
    Amphibious Construction Batallion Two, 1815 Seabee Drive, Norfolk, 
VA 23701
* * * * *
N55271 (MAJ00070)--LP8
    Commander, Combat Logistics Group One (N716), Building 221-2W, NSC, 
Oakland, CA 94625-5309
* * * * *
N57092 (MAJ00070)--V5U
    Naval Inshore Undersea Warfare Group One, Building 184, Box 
357140NOLF, Imperial Beach, CA 92135-7140
* * * * *
N61463 (MAJ00060)--LHB-D, LH2-4
    Supply Officer, COMNAVBASE Supply, 1530 Gilbert Street, Suite 8, 
Norfolk, VA 23511-2793
* * * * *
N62472--JP
    Naval Facilities Engineering Command, Northern Division, 10 
Industrial Highway, Mail Stop # 82k Lester, PA 19113
* * * * *
N66022 (MAJ00018)--MDW
    Naval Dental Center, San Diego, CA 92136-5147
* * * * *
N66101 (MAJ00018)--J5B-D
    U.S. Naval Hospital ROTA, PSC 819, Box 18, FPO AE 09645-2500
* * * * *
N66972 (MAJ00022)--MQ2
    Commanding Officer, Navy Recruiting District, 8525 N.W. 53red 
Terrace, Suite 201, Miami, FL 33166
N67596 (MAJ00022)--NVD
    Commanding Officer, Navy Recruiting District, 10500 N. U.S. Highway 
281, Suite 108, San Antonio, TX 78216-3630
* * * * *
N68317 (MAJ00062)--R03
    Naval Administrative Unit, 1 Amsterdam Road, Scotia NY 12302-9460
* * * * *
N68326 (MAJ00018)--MDA
    Naval Dental Center, 2707 Sheridan Road, Bldg 73, Great Lakes, IL 
60088-5258
* * * * *
N68389 (MAJ00011)--LB4
    Commander, Joint Intelligence Center, Pacific/DSL, P.O. Box 500, 
Bldg 352, Makalapa Drive, Pearl Harbor, HI 96860-7450
* * * * *
N68409 (MAJ00018)--QAU
    Naval Dental Center, San Francisco, CA 94130-5030
* * * * *
N68482 (MAJ00022)
    Department of the Navy, BUPERS Det DAPMAL, Bldg 11, Naval Training 
Center, 32110 Perry Road, Suite 110, San Diego, CA 92133-1521
* * * * *
N68573 (MAJ00023)--4JM
    Navy Exchange Service Center, NAVABASE, Norfolk, Bldg CD-1, 9222 
Hamption Blvd, Norfolk, VA 23511-6390
* * * * *
N68939 (MAJ00012)--V8R
    Naval Information Systems Management Center, Washington Navy Yard, 
Bldg 176-4, Washington, DC 20374-5070
* * * * *
    75. Appendix G to Chapter 2 is amended by revising Part 9 to read 
as follows:

PART 9--DEFENSE SPECIAL WEAPONS AGENCY ACTIVITY ADDRESS NUMBERS

DSWA01--8Z
    Defense Special Weapons Agency, Headquarters, ATTN; Acquisition 
Management Directorate (AM), 6801 Telegraph Road, Alexandria, VA 22310-
3398 (ZD30)
DSWA02--0N
    Defense Special Weapons Agency, Field Command, ATTN: Acquisition 
Management Office (FCA), 1680 Texas Street, S.E., Kirtland AFB, NM 
87115-5669

[[Page 50458]]

(ZD31)

    76. Appendix G to Chapter 2 is amended in Part 10 by revising under 
entry ``MDA972--WS'' the abbreviation ``ARPA'' to ``DARPA''.

Appendix I to Chapter 2  [Amended]

    77. Appendix I to Chapter 2 is amended in section I-102, paragraphs 
(a) and (b), and in section I-103, paragraph (a), by revising the date 
``September 30, 1995'' to read ``September 30, 1996''.

[FR Doc. 96-24064 Filed 9-25-96; 8:45 am]
BILLING CODE 5000-04-M

Complete official Federal Register PDF