1. 	Chapter 62 	of Title 11, 	Hawaii
Administrative 	Rules, 	entitled 	"Wastewater Systems 11 is
amended 	and 	compiled 	to 	read as 	follows:
"HAWAII ADMINISTRATIVE 	RULES
TITLE 	11
DEPARTMENT OF HEALTH
CHAPTER 62
WASTEWATER SYSTEMS
Subchapter 	1 	Prohibitions 	and General
Requirements
§11-62-01
§11-62-02
§11-62-03
§11-62-04
§11-62-05
§11-62-06
§11-62-07
§11-62-07.1
§11-62-08
§11-62-09
§11-62-10
§11-62-11
§11-62-12
Preamble
Purpose 	and 	applicability
Definitions
County wastewater 	advisory committee
Critical 	wastewater 	disposal 	areas
(CWDA)
General 	requirements
Repealed
Requirements 	for 	non-domestic
wastewater
Other 	requirements 	for 	wastewater
systems
Public 	access 	to 	information
Public 	hearings 	and 	informational
meetings
Incorporation by 	reference
Timely processing
:~17 6
3176
Subchapter 	2 	Wastewater 	Treatment 	Works
§11-62-21
§11-62-22
§11-62-23
§11-62-23.1
§11-62-24
§11-62-25
§11-62-26
§11-62-27
§11-62-28
§11-62-29
Repealed
Repealed
Repealeq
Specific 	requirements 	for wastewater
treatment 	works
Treatment 	unit 	requirements
Wastewater 	effluent 	disposal 	systems
Wastewater 	effluent 	requirements ,
recycled water quality and monitoring
requirements 	applicable 	to 	treatment
works 	treating 	wastewater
Recycled water 	systems
Additional 	monitoring, 	recordkeeping,
and 	reporting
(Reserved)
Subchapter 	3 	Individual 	Wastewater Systems
§11-62-31
§11-62-31.1
§11-62-31.2
§11-62-32
§11-62-33
§11-62-33 . 1
§11-62-34
§11-62-35
§11-62-36
§11-62-37
§§11-62-38 	to
Repealed
General 	requirements 	for 	individual
wastewater 	systems
Site 	evaluation
Spacing of 	individual 	wastewater
systems
Repealed
Specific 	requirements 	for 	new and
proposed treatment 	units
Specific 	requirements 	for 	new and
proposed disposal 	systems
Other 	individual 	wastewater 	systems
Cesspools
Application 	for 	and 	review of 	building
permits 	and 	individual 	wastewater
systems
11-62-39 	(Reserved)
Subchapter 4 	Wastewater Sludge 	Use 	and Disposal
§11-62-41 	General 	requirements 	and prohibition
§11-62-41.1
§11-62-42
§11-62-43
§11-62-44
§11-62-45
§11-62-46
§11-62-47
§11-62-48
Relation 	to federal 	law
Land application of 	exceptional 	quality
wastewater 	sludge
Land application of 	other 	than
exceptional 	quality wastewater
sludge, 	to agricultural 	land, 	forest,
public 	contact 	site, 	or 	reclamation
site
Land 	application of 	domestic 	septage 	to
agricultural 	land, 	forest, 	or
reclamation site
Repealed
Pathogens
Vector 	attraction 	reduction
Sampling 	method
Subchapter 	5 	Wastewater Management 	Permits 	and
Registration
§11-62-50
§11-62-51
§11-62-52
§11-62-53
§11-62-54.01
§11-62-54.02
§11-62-54.03
§11-62-54.04
§11-62-54.05
§11-62-54.06
§11-62-54.07
§11-62-54.08
§11-62-54.09
§11-62-55.01
§11-62-55.02
§11-62-55.03
§11-62-55.04
Registration 	and permits
Fees
Signatories 	and 	certification
requirements
Wastewater management 	registration
Wastewater 	management 	individual
permits
Draft 	individual 	permits
Fact 	sheets
Public 	notices 	of 	draft 	individual
permits; 	public 	comments 	and hearing
requests
Public meetings 	or 	hearings 	on
individual 	permits
Public notice 	of 	public 	meetings 	or
hearings 	on 	individual 	permits
Response 	to 	comments
Issuance 	of 	individual 	permits;
duration, 	conditions
Schedules 	of 	compliance
Repealed
Repealed
Requiring 	an 	individual 	permit
Repealed
~ 1 7 h 	I Jld
§11-62-55.05
§11-62-55.06
§11-62-55.07
§11-62-55.08
§11-62-56
§11-62-57.01
§11-62-57.02
§1 1-62-57.03
§11 - 62-57.04
§11-62-58
Repeale d
Repealed
Repealed
Repealed
Standard permit 	conditions
Transfer 	of permits
Modification or 	revocation 	and
reissuance 	of permits
Termination of permits
Renewal 	of 	permits
Conflict 	of 	interest
Subchapter 6 	Wastewater 	and Wastewater 	Sludge
Pumpers 	and Haulers
§11-62-60
§11-62-61
§11 -62 -62
Applicabi l ity
Registration 	requirements
Recordkeeping 	and 	reporting
Su bchapter 7 	Variances, 	Penalties 	and
Severability
§11-62-71
§11-62-72
§11-62-73
§11-62-74
Variances
Penalties 	and remedies
Severability
Pub l ic participation 	in 	enforcement
Subchapter 	8 	Field Citations
§11-62-81
§11-62-82
§11-62 - 83
§11-62-84
Purpose
Offer 	to 	settle ; 	settlement 	amounts
Resoluti o n 	of 	field 	citation
Form of 	citation
§11-62-01
SUBCHAPTER 1
PROHIBITIONS AND GENERAL REQUIREMENTS
§11-62-01 	Preamble. 	The department 	of health
seeks 	to 	ensure 	that 	the 	use 	and disposal 	of
wastewater 	and wastewater 	sludge does 	not 	contaminate
or pollute 	any valuable 	water 	resource, 	does 	not 	give
rise 	to public 	nuisance, 	and does 	not 	become a 	hazard
or potential 	hazard 	to 	the 	public 	health, 	safety, 	and
welfare.
The 	department 	of 	health 	seeks 	to 	migrate 	towards
an 	ultimate 	goal 	of 	regional 	sewage 	collection,
treatment 	and disposal 	systems 	that 	are 	consistent
with 	state 	and 	county wastewater planning policies.
Off-site 	treatment 	and disposal 	systems, 	followed 	in
priority by on-site 	systems, 	meeting health and
environmental 	standards 	will 	be 	allowed whenever 	they
are 	consistent 	with 	state 	and 	county wastewater
planning policies 	and on 	the 	premise 	that 	these
systems 	will 	eventually connect 	to 	regional 	sewage
systems. 	Individual 	wastewater 	systems 	may be
utilized 	in 	remote 	areas 	and 	in 	areas 	of 	low
population 	density. 	Hawai'i 	is 	long 	overdue 	in
eliminating 	construction of 	wastewater 	disposal
systems 	depositing 	untreated 	sewage 	into 	the
environment, 	such 	as 	cesspools. 	Indeed, 	the
department 	stated 	in 	its 	prior 	rules 	back 	in 	the
1990's, 	with 	the 	agreement 	of 	all 	counties' 	wastewater
advisory committees, 	that 	installation 	of 	new
cesspools 	should 	end 	after 	the 	year 	2000.
The 	department 	of 	health 	seeks 	to work 	in 	close
partnership with 	the 	counties 	to 	manage 	wastewater 	to
prevent pollution 	and harm 	to 	public 	health, 	safety
and welfare. 	Each 	county may 	participate 	in 	the
implementation of 	these 	rules 	through 	the
recommendations 	of 	a 	county wastewater 	advisory
committee 	to 	the 	director.
The 	department 	of 	health 	seeks 	to 	advance 	the 	use
of 	recycled water 	and wastewater·sludge 	consistent
with public 	health 	and 	safety and environmental
quality. 	The 	state 	department 	of 	health 	acknowledges
that 	when properly 	treated 	and used, 	all 	recycled
62-5
,176
§11-62-01
water 	and 	wastewater 	sludge 	are 	valuable 	resources
with environmental 	and 	economic 	benefits 	and can be
used 	to 	conserve 	the 	State 1 s 	precious 	resources. 	The
director 	acknowledges 	that 	the 	most 	highly 	treated
recycled water 	and exceptional 	quality wastewater
sludge 	can be 	used 	for 	a 	wide 	variety of 	applications
with the 	appropriate 	restrictions 	and when 	best
management 	practices 	and other 	requirements 	of 	this
chapter 	are met . 	( Eff 	12/10/88; 	am 	and 	comp
12/09/2004; 	am and comp 	MAR 9. 1 ?016 	J 	(Auth:
§§321-11, 	322-8 (a), 	342D-4, 	'34:20-'5', 	342E-3) (Imp:
§§321-11, 	322-1 	to 	322-4 , 	322-8, 	342D-2, 	342D-4,
5, 	342D-50, 	342E-3)
HRS
HRS
342D-
§11-62-02 	Purpose 	and applicability. 	(a) 	This
chapter 	seeks 	to 	ensure 	that 	the 	use 	and disposal 	of
wastewater 	and 	wastewater 	sludge 	from wastewater
systems:
(1) 	Do not 	contaminate 	or pollute 	any drinking
water 	or 	potential 	drinking wat er 	supply, 	or
the 	waters 	of 	any beaches, 	shores, 	ponds,
lakes, 	streams, 	groundwater , 	or 	shellfish
growing waters;
(2) 	Do not 	encourage 	the 	harborage of 	insects,
rodents, 	or 	other possible vectors;
(3) 	Do not 	give 	rise 	to 	nuisances;
(4) 	Do not 	become 	a 	hazard or a 	potential 	hazard
to 	public 	health, 	safety and welfare;
(5) 	Contribute 	to 	the 	achievement 	of 	wastewater
management 	goals 	contained in 	approved
county water 	quality management 	plans;
(6) 	Reinforce 	state 	and 	county planning
policies; 	and
(7) 	Are 	consistent 	with 	the 	State 1 s
administration of 	the 	National 	Pollutant
Discharge Elimination System .
(b) 	This 	chapter 	seeks 	to 	advance 	the
appropriate 	uses 	of 	recycled water 	and 	wastewater
sludge.
{c) 	This 	chapter 	allows 	and 	does 	not 	preempt
provisions 	in 	county codes, 	rules 	or 	ordinances 	that
are not 	inconsistent 	with 	these 	rules, 	including,
62-6
§11-62-03
without 	limitation:
(1) 	Plumbing 	requirements 	in county plumbing
codes 	or 	rules, 	including county adoptions
of 	all 	or parts 	of 	the 	Uniform Plumbing
Code;
(2) 	Sanitary sewer 	system and wastewater
treatment 	works 	use 	permission 	and
pretreatment 	requirements 	in county
ordinances 	or 	rules 	regarding 	the
introduction of 	fats, 	oils, 	grease, 	septage,
sludge, 	or 	wastewater 	into 	sanitary sewers
or wastewater 	treatment 	works, 	requirements
on 	the 	use 	of 	grease 	traps, 	and 	requirements
on wastewater 	and wastewater 	sludge pumping
and 	hauling;
(3) 	Storm 	sewer 	system use 	permission
requirements 	in 	county 	ordinances 	or rules;
or
(4) 	Water 	recycling 	requirements 	in county
ordinances 	or 	rules, 	including 	requirements
for 	connection 	to or use 	of 	available
recycled water. 	[Eff 	12/10/88 h am and comp
12/09/2004; 	am and comp 	MAR~ l 	2016 	J
(Auth: 	HRS 	§§321-11, 	322-B(a), 	342D-4,
342D-5, 	342E-3) 	(Imp: 	HRS 	§§321-11, 	322-1
to 	322-4, 	322-8, 	342D-2, 	342D-4, 	342D-5,
342D-50, 	342E-3; 	HRS 	ch. 	340E; 	33 	U.S.C.
§§1311, 	1342, 	1345; 	40 	CFR 	Parts 	122, 	123,
501, 	503)
§11-62-03 	Definitions. 	As 	used 	in 	this 	chapter:
"Activated 	sludge 	process" 	means 	a 	biological
wastewater 	treatment 	process 	in which 	a 	mixture 	of
wastewater and microorganisms 	is 	agitated with 	induced
aeration. 	Aeration 	supplies 	dissolved 	oxygen and
wastewater 	supplies 	the 	organic 	substrate 	necessary
for 	microorganism growth. 	This 	process 	includes
sedimentation units 	which 	follow 	the 	aeration and
where 	settled solids 	are 	withdrawn 	for 	disposal 	or
returned 	to 	the 	aeration 	unit .
"Aerobic 	treatment 	unit 	system" 	shall 	have 	the
same 	meaning 	as 	defined 	in Chapter 	235, 	HRS.
"Aerosol" 	means 	a 	solid 	suspended 	in 	air with or
62-7
317 6
317 6
§11-62-03
without 	preceding 	evaporation.
"Bedrock" 	means 	a 	continuous 	horizontal 	layer of
hardened mineral 	deposits 	that 	does 	not 	support 	the
growth of 	common plant 	life.
"Bedroom" 	means 	any 	room within 	a 	dwelling 	that
is 	or 	might 	reasonably be 	used 	as 	a 	sleeping 	room. 	A
room 	is 	presumed 	to 	be 	a 	bedroom if 	it 	has 	a
superficial 	floor 	area 	not 	less 	than 	seventy square
feet 	and 	is 	provided with windows 	or 	skylights 	with 	an
area 	of 	not 	less 	than one-tenth of 	the 	floor 	area or
ten 	square 	feet, 	whichever 	is 	greater.
"Best 	management 	practices" 	or 	"BMPs" 	means 	the
most 	effective, 	practical 	schedules 	of 	activities,
prohibitions 	of 	conduct, 	maintenance procedures, 	and
other 	specifications 	of 	conduct 	to prevent 	or 	reduce
the 	pollution. 	BMPs 	also 	include 	treatment
requirements, 	operating procedures, 	and 	practices 	to
site 	runoff, 	spillage 	or 	leaks, 	sludge 	or 	waste
disposal, 	and drainage 	from 	raw material 	storage .
"BODs" 	means 	five 	days 	biochemical 	oxygen demand
as measured by a 	standard test 	indicating 	the 	quantity
of 	oxygen 	utilized by wastewater under 	controlled
conditions 	of 	temperature 	and 	time.
11 Building 11 	means 	a 	structure, 	permanent 	or
temporary, 	built, 	erected, 	and framed 	of 	component
structural 	parts 	used or 	designed 	for 	the 	housing,
she l ter, 	workplace, 	enclosure 	or 	support 	of persons,
animals 	or property of 	any kind.
"Building modification" 	means 	any 	change 	to 	an
existing building's 	configuration 	that 	may 	result 	in
the 	increase 	in wastewater 	flows 	or 	change 	in the
wastewater 	characteristics.
"Cesspool" 	means 	an 	individual 	wastewater 	system
cons i sting 	of 	an 	excavation 	in 	the 	ground whose 	depth
is 	greater 	than 	its 	widest 	surface 	dimension, 	which
receives 	untreated wastewater, 	and 	retains 	or 	is
designed 	to 	retain 	the 	organic 	matter 	and 	solids
discharging 	therein, 	but 	permits 	the 	liquid 	to 	seep
through 	its 	bottom 	or 	sides 	to 	gain access 	to 	the
underground 	formation.
"Collection 	system" 	means 	the 	conveyance 	system,
which 	includes 	the 	building 	and 	street 	sewer 	laterals,
Interceptor sewer, 	sewage 	pump 	station, 	and 	force
62-8
§11-62-03
main, 	used 	to 	transport 	the 	sewage 	to 	the 	treatment
unit.
"Composite sample" 	means 	sample(s) 	collected on
regular 	intervals 	in proportion 	to 	the 	existing 	flow
or volume 	and 	then combined to 	form 	a 	sample 	that
represents 	the 	flow or volume 	over a 	period of 	time 	or
space.
"Compost 	toilet" 	means 	a 	non-flush, 	waterless
toilet 	that 	employs 	an aerobic 	composting process 	to
treat 	toilet 	wastes.
"Confined work areas" 	means 	any area having 	a
limited 	means 	of 	egress, 	which 	is 	subject 	to 	the
accumulation of 	toxic 	or flammable 	contaminants 	or has
an oxygen 	deficient 	atmosphere. 	Confined work 	areas
include, 	but 	are 	not 	limited to, 	storage 	tanks,
process 	vessels, 	bins, 	ventilation or exhaust 	ducts,
sewers, 	underground utility vaults, 	tunnels,
pipelines, 	and open 	top 	spaces 	more 	than 	four 	feet 	in
depth 	such 	as 	pits, 	tubs, 	vaults 	and vessels .
"Construction" 	in 	the 	context 	of 	a 	wastewater
system means 	the 	building 	of 	the 	system in 	the 	ground;
construction 	is 	not 	completed until 	the 	system has
been 	fully 	installed so 	that 	it 	is 	ready 	for 	hookup.
"Contractor" 	means 	the 	installer of 	a 	wastewater
system or 	any part 	of 	a 	wastewater 	system.
"County" 	means 	any 	county of 	the 	state.
"Critical 	Wastewater 	Disposal Area 	(CWDA) 11 	means
an area where 	the 	disposal 	of 	wastewater has 	or 	may
cause 	adverse 	effects 	on human 	health or 	the
environment 	due 	to 	existing 	hydrogeological
conditions.
11 Department 11 	means 	the 	department 	of 	health.
11 Director" 	means 	the 	director 	of 	health 	o r 	the
director's 	duly 	authorized 	agent, 	including 	a
contractor 	of 	the 	director.
"Disinfection" 	means 	a 	process 	to 	destroy,
neutralize, 	or 	inhibit 	the 	growth 	of 	pathogenic
microbes.
"Disposal 	system" 	means 	any 	sewer, 	sewer outfall,
sewer 	lateral, 	seepage pit, 	cesspool, 	injection well,
soil 	absorption 	system, 	disposal 	trench, 	or other
facility 	used 	in 	the 	disposal 	of 	wastewater or
wastewater 	sludge, 	including 	any wastewater
62-9
; 	17 6
317 6
§11-62-03
transmission lines, 	pumps, 	power, 	or 	other 	equipment
associated with 	the 	ultimate 	disposal 	of 	wastewater 	or
wastewater 	sludge.
"Distribut i on box 11 means 	a 	watertight 	chamber
from 	which effluent 	from a 	treatment 	unit 	is
distributed evenly to 	various 	portions 	of 	a 	disposal
system.
11 Drip 	irrigation 11 means 	application of 	water 	and
wastewater, 	including recycled water, 	from 	emitters,
either on 	the 	surface or 	subsurface, 	that 	are 	part 	of
a 	piping 	system alongside 	the 	plants 	being 	irrigated
and 	that 	discharges 	at 	a 	rate 	not 	to 	exceed 	two
gallons 	per hour 	per emitter.
11 Domestic 	sewage 11 is 	waste 	and wastewater 	from
humans 	or household operations 	that 	is:
(1) 	Discharged to 	or 	otherwise 	enters 	a
treatment 	works; 	or
(2 } 	Of 	a 	type 	that 	is 	usually discharged 	to or
otherwise 	enters 	a 	treatment 	works 	or an
individual 	wastewater 	system.
"Domestic 	wastewater" 	has 	the 	same meaning 	as
"domestic 	sewage".
" Dwelling" 	means 	any building which 	is wholly or
partly used or 	intended 	to 	be 	used for 	living or
sleeping by human occupants 	and 	includes, 	but 	is 	not
limited 	to, 	apartment houses, 	single 	family houses ,
duplex houses, 	cluster houses, 	townhouses, 	and planned
developments, 	but 	excludes 	hotels 	and lodging houses.
" Dwelling unit M means 	any habitable 	room or group
of 	habitable 	rooms 	located 	within a 	dwelling 	and
forming 	a 	single 	habitable 	unit 	with 	facilities 	which
are 	used or 	intended 	to be 	used 	for 	living, 	sleeping ,
cooking, 	and eating .
"Engineer" 	means 	a 	professional 	engineer
registered 	in 	the 	State of 	Hawaii.
" EPA 11 means 	the 	United States 	Environmental
Protection Agency .
"EPA 1 s 	methods 	for 	chemical 	analysis 	of 	water 	and
wastes" 	means 	the 	1979 	edition 	of 	" Methods 	for
Chemical Analysis 	of 	Water 	and Wastes" 	as 	published by
the 	EPA .
11 Evapotranspiration 	system " 	means 	a 	subsurface
disposal 	system which relies 	on 	soil 	capillarity and
62-10
§11-62-03
plant 	uptake 	to 	dispose 	of 	treated effluent 	through
surface 	evaporation 	and 	plant 	transpiration.
"Exceptional 	quality sludge" 	means 	wastewater
sludge 	that 	has 	been 	treated to 	a 	level 	specified 	in
this 	chapter 	in which 	it 	may be 	used 	with little 	or no
restrictions 	for 	land 	application.
"Existing 11 	means 	constructed under 	a 	valid county
permit 	or with written 	approval 	from 	the 	director
before 	the 	effective 	date 	of 	this 	rule.
11 Filter 	fabric" 	means 	a 	woven 	or 	spun-bonded
sheet 	material 	used 	to 	impede 	or prevent 	the 	movement
of 	sand, 	silt 	and 	clay 	through 	the 	filter 	material.
This 	material 	shall 	be 	non-biodegradable, 	resistant 	to
acids 	and 	alkalies 	within 	a 	pH 	range 	of 	4 	to 	10, 	and
resistant 	to 	common 	solvents .
"Grab 	sample" 	means 	a 	single 	discrete 	sample 	of
wastewater 	collected 	at 	a 	particular 	time 	and 	place
which 	represents 	the 	composition of 	the 	source 	at 	that
time 	and place.
"Graywater" 	shall 	have 	the 	same 	meaning 	as
defined 	in HRS 	section 	342D-1.
"Haul" 	means 	the 	transport 	of 	an 	item 	by vehicle
or boat.
"Holding tank" 	means 	a 	nonportable, 	watertight
closed vault 	used or designed 	to 	temporarily hold
domestic wastewater.
"Household aerobic 	unit" 	means 	an 	individual
wastewater 	system which 	receives 	domestic wastewater
from dwellings 	or 	from 	other 	sources 	generating
wastewater 	of a 	similar volume 	and 	strength, 	and
retains 	solids, 	aerobically digests 	organic matter
over a 	period of 	time, 	and allows 	the 	clarified
effluent 	to discharge 	outside 	the 	tank 	into 	a 	disposal
system.
"Individual permit" 	means 	a 	document 	issued under
this 	rule 	to a 	specific person 	for 	a 	specific
facility, 	or practice 	to 	generate, 	treat, 	use,
dispose, 	or discharge 	of 	wastewater 	and wastewater
sludge 	at 	a 	specific 	location.
"Individual 	wastewater 	systems" 	means 	facilities,
such as 	septic 	systems, 	aerobic 	treatment 	units, 	and
cesspools, 	that 	are 	not 	connected 	to 	a 	sewer 	and are
used 	and designed 	to 	receive 	and 	dispose 	of :
62-11
317 6
317 6
§11-62-03
{1) 	No 	more 	than one 	thousand gallons 	per 	day 	of
domestic 	wastewater; 	or
(2) 	Greater 	than one 	thousand gallons 	per 	day of
domestic 	wastewater 	from 	buildings 	with highly
variable 	flows.
"Injection well" 	has 	the 	same meaning 	as 	defined
in chapter 	11-23.
"Land application" 	means 	the 	spraying or
sp r eading 	of 	wastewater 	sludge 	onto 	the 	land 	surface,
the 	injection of 	wastewater 	sludge below the 	land
surface, 	or 	the 	incorporation of 	wastewater 	sludge
into 	the 	soil 	such that 	the wastewater 	sludge
can 	either condition 	the 	soil 	or 	fertilize 	crops 	or
vegetation grown 	in 	the 	soil.
"Large 	capacity 	cesspciol" 	means 	a 	cesspool 	that
serves 	more 	than one 	residential 	dwelling or, 	for 	a
non-residential 	cesspool, 	has 	the 	capacity to 	serve
twenty or 	more 	persons 	per 	day.
"Living area" 	means 	the 	portion(s) 	of a 	dwelling
unit 	including, 	but 	not 	limited to, 	the 	bedroom,
kitchen, 	bathroom, 	living 	room, 	family 	room, 	covered
lanai, 	den, 	and 	library, 	but 	excluding 	the 	garage,
carport, 	open 	lanai, 	fence, 	and utility shed.
"Makai" 	means 	toward 	the 	sea 	or the 	area outside
the 	Underground 	Injection 	Control 	(UIC) 	Line
encircling 	the 	protected 	aquifer.
"Manual 	of Septic Tank 	Practice" 	means 	the 	United
States 	Department 	of 	Health, 	Education and Welfare
Publication No. 	(HSM) 	72-10020, 	formerly 	known as 	"PHS
Publication No. 	526 " , 	revised 	in 	1967.
"Modal 	time 11 	means 	the 	amount 	of 	time 	elapsed
between 	the 	time 	that 	a 	tracer, 	such 	as 	salt 	or dye,
is 	injected 	into the 	influent 	at 	the 	entrance 	to 	a
chamber 	and 	the 	time 	that 	the 	highest 	concentration of
the 	tracer 	is 	observed 	in water where 	it 	is 	discharged
from 	the 	chamber.
"Mound 	system11 means 	a 	soil 	absorption 	system
which 	is 	installed 	in or below 	an 	artificially created
mound or 	earth.
"MPN 11 means 	most 	probable 	number.
11 New 11 	means 	constructed 	on or 	after 	the 	effective
date 	of 	this 	chapter.
"Non-domestic 	wastewater" 	means 	all 	wastewater
62-12
§11-62-03
excluding 	domestic wastewater.
"Non-exceptional 	quality wastewater 	sludge" 	means
wastewater 	sludge 	that 	is 	not 	exceptional 	quality
wastewater 	sludge.
"Owner" 	means 	a 	person(s) 	who has 	legal 	title 	to
a 	treatment 	works 	or 	individual 	wastewater 	system, 	or
duly authorized representative 	of 	the 	owner .
"Pathogenic 	organisms" 	means 	disease-causing
organisms. 	These 	include, 	but 	are 	not 	limited to,
certain bacteria, 	protozoa, 	viruses, 	and viable
helminth ova.
"Person" 	has 	the 	same 	meaning 	as 	defined in
section 	342D-l, 	HRS.
"Person who 	prepares 	wastewater sludge" 	means
anyone 	who 	generates 	wastewater 	sludge 	during 	the
treatment 	of 	wastewater 	in a 	wastewater treatment
works, 	a 	person who 	derives 	a 	material 	from wastewater
sludge, 	a 	person 	who provides 	treatment 	of 	wastewater
sludge, 	or 	a 	person 	who 	changes 	the 	quality of
wastewater 	sludge.
"pH" 	means 	the 	logarithm 	of 	the 	reciprocal 	of 	the
hydrogen 	ion 	concentration measured at 	25 	degrees
Celsius 	or measured 	at 	another 	temperature 	and 	then
converted 	to 	an 	equivalent 	value 	at 	25 	degrees
Celsius.
"Private" 	means 	not 	owned 	or 	operated by a
federal, 	state, 	or 	county 	authority.
"Proposed" 	means 	put 	forward 	for 	consideration or
suggested to 	the 	director. 	For 	the 	purposes 	of 	this
chapter, 	"proposed" 	shall 	refer 	to 	the 	plans 	for 	a
wastewater 	system or 	activity.
"Public" 	means, 	for 	issues 	of 	ownership, 	owned or
operated by a 	federal, 	state; 	or 	county authority .
"Public water 	system" 	has 	the 	same 	meaning 	as
defined in 	chapter 	11-20.
"Qualified 	cesspool" 	shall 	have 	the 	same meaning
as 	defined 	in 	Chapter 	235, 	HRS.
"Qualified expenses" 	shall 	have 	the 	same meaning
as 	defined 	in 	Chapter 	235, 	HRS.
"R-1 water" 	means 	recycled water 	that 	has 	been
oxidized, 	filtered, 	and disinfected 	to meet 	the
corresponding 	standards 	set 	in 	this 	chapter.
"R-2 	water" 	means 	recycled water 	that 	has 	been
62-13
,; 116
§11-62-03
oxidized and disinfected to meet 	the 	corresponding
standards 	set 	in 	this 	chapter.
"R-3 	water" 	means 	recycled water 	that 	has 	been
oxidized to meet 	secondary 	treatment 	standards 	as 	set
forth 	by EPA.
••Recycled water" 	means 	treated wastewater 	that 	by
design 	is 	intended or used 	for 	a 	beneficial 	purpose .
"Recycled water 	system" 	means 	a 	facility 	which
conveys 	to 	users 	or 	uses 	recycled water. 	Recycled
water 	systems 	are 	subdivided 	into distribution and 	use
systems. 	Recycled water 	systems 	include 	all 	piping,
storage, 	and 	repressurization 	facilities 	to deliver
recycled water 	to 	users, 	but 	exclude 	treatment 	units.
"Residential 	large 	capacity cesspool" 	shall 	have
the 	same meaning 	as 	defined 	in HRS 	section 342D-l.
"Reuse 	guidelines" 	means 	the 	"Guidelines 	for 	the
treatment 	and 	use 	of 	reclaimed water", 	Hawaii 	State
Department 	of 	Health, 	Wastewater Branch, 	November 	23,
1993, 	revised 	January 2016.
"Seepage 	pit" 	means 	an 	excavation 	in 	the 	ground
whose 	depth 	is 	greater 	than 	its 	widest 	surface
dimension 	and 	which 	receives 	the 	discharge 	from
treatment 	units 	and 	permits 	the 	effluent 	to 	exit
through 	its 	bottom or 	sides 	for 	gradual 	seepage 	into
the 	ground which does 	not 	result 	in 	contamination of
water-bearing 	formations 	or 	surface 	water.
"Septage" 	means 	either a 	liquid 	or 	solid material
removed 	from 	a 	septic 	tank, 	cesspool, 	portable 	toilet,
Type 	III 	marine 	sanitation 	device, 	or 	similar
treatment 	works 	that 	receives 	wastewater.
"Septic 	system" 	shall 	have 	the 	same 	meaning 	as
defined 	in 	Chapter 	235, 	HRS.
"Septic 	tank" 	means 	a 	watertight 	receptacle 	that
receives 	the 	raw 	wastewater, 	retains 	after 	settling
solid matter 	or 	sewage 	for 	treatment 	by bacteria, 	and
discharges 	a 	partially 	treated 	effluent.
"Sewage 	sludge" 	means 	any 	solid, 	semi-solid, 	or
liquid residue 	removed 	during 	the 	treatment 	of
municipal 	wastewater 	or 	domestic 	sewage. 	Sewage
sludge 	includes, 	but 	is 	not 	limited 	to, 	solids 	removed
during 	primary, 	secondary, 	or 	advanced wastewater
treatment, 	scum, 	septage, 	portable 	toilet 	pumping,
Type 	III 	Marine 	Sanitation device pumpings 	(33 	Code 	of
62-14
§11-62-03
Federal 	Regulations 	Part 	159), 	and sewage 	sludge
products. 	Sewage 	sludge 	does 	not 	include 	grit,
screenings, 	or ash generated during 	the 	incineration
of 	sewage 	sludge.
11 Sewer 11 	means 	a 	pipe 	or 	conduit or any other
appurtenances 	that 	carry wastewater 	from a 	building or
buildings 	to a 	specific point 	for 	treatment 	and
disposal.
"Sewer system" 	shall 	have 	the 	same meaning as
defined in Chapter 235, 	HRS.
"Soil 	absorption" 	means 	a 	process 	which uses 	the
soil 	to 	treat 	and dispose 	of 	effluent 	from a 	treatment
unit. "Spray irrigation" 	means 	application of water and
wastewater, 	including recycled water, 	to 	the 	land to
maintain vegetation or 	support 	the 	growth of
vegetation by spraying 	the 	water and wastewater above
ground from 	sprinklers, 	micro-sprinklers, 	or orifices
in piping.
11 SS 11 	means 	suspended solids 	and 	indicates 	the
characteristic 	state 	of 	solids 	in wastewater.
"Standard methods" 	means 	the 	22 nd edition, 	2014,
of 	"Standard Methods 	for 	the 	Examination of 	Water and
Wastewater" 	as 	published by the American Water Works
Association, 	American Public 	Health Association and
the Water 	Pollution Control 	Federation, 	unless 	another
edition 	is 	specified by 	the 	director.
"State waters" 	shall 	have 	the 	same meaning as
defined 	in 	section 342D-l, 	HRS.
"Subsurface disposal 	system" 	means 	a 	disposal
system 	that 	allows 	the 	gradual 	seepage 	of 	effluent
into 	the 	ground which does 	not 	result 	in contamination
of water-bearing 	formations 	or surface water, 	such as
a 	seepage pit, 	cesspool , 	soil 	absorption 	system , 	or
other 	facility used in the 	disposal 	of wastewater,
including any wastewater transmission 	lines, 	pumps,
power, 	or other 	equipment 	associated with the disposal
of wastewater.
"Subsurface drip 	irrigation" 	means 	the
application of 	water and 	wastewater , 	including
recycled water, 	to 	the 	land to maintain vegetation or
to support 	the 	growth of 	vegetation by discharging or
emitting 	the 	water and wastewater 	from orifices 	in
62-15
,.31 7 6
317 6
§11-62-03
piping below the 	surface 	or 	finished 	grade.
"Suitable soil" 	means a 	soil 	which acts 	as 	an
effective 	filter 	in the removal 	of 	organisms 	and
suspended 	solids before 	the 	effluent 	reaches 	any
highly permeab l e 	earth 	formations, 	bedrock, 	or
groundwater.
"Surface disposal" 	means 	the 	placing of
wastewater 	sludge on the 	land 	for 	final 	disposal 	and
includes 	storage on land 	for 	two 	or more years.
"Surface 	irrigation" 	means 	the 	application of
water and 	wastewater, 	including 	recycled water, 	by
means 	other 	than spraying.
"Ten States Standards" 	means 	the 	1980 	edition of
the 	Recommended 	Standards 	for 	Individual 	Sewage
Systems, 	a 	report 	by the 	committee 	of 	the 	Great Lakes-
Upper Mississippi River Board of 	State Sanitary
Engineers 	on the policies 	for 	review and approval of
plans 	and specifications 	for 	ind i vidual 	wastewater
systems.
"Theoretical detention 	time" 	means 	the 	value
obtained by dividing 	the vo l ume 	of 	a 	chamber, 	through
which 	fluid 	flows, 	by the 	flow 	rate 	expressed in
amount 	of 	fluid 	volume 	per unit 	of 	time.
"Treatment 	unit" 	means 	any plant, 	facility, 	or
equipment 	used 	in the 	treatment 	of 	wastewater,
including 	the 	necessary pumps, 	power equipment,
blowers, 	motors, 	holding 	tanks, 	flow splitter, 	and
other process 	equipment.
"Treatment works" 	means 	any 	treatment 	unit and
its 	associated collection 	system and disposal 	system,
excluding 	individual 	wastewater 	systems.
"Vector attraction 11 	means 	the 	characteristic of
wastewater sludge 	that 	attracts 	rodents, 	flies,
mosquitoes, 	or other organisms 	capable 	of 	transporting
infectious 	agents.
"Wastewater" 	means any 	liquid waste, 	whether
treated or not, 	and whether animal, 	mineral, 	or
vegetable, 	including agricultural, 	industrial, 	and
thermal wastes.
"Wastewater sludge0 	has 	the 	same 	meaning as
"sewage 	sludge". -
"Wastewater sludge 	facility" 	means 	a 	facility
which 	collects, 	handles, 	stores, 	treats, 	or disposes
62-16
§11-62-04
of 	wastewater 	sludge. 	Wastewater 	sludge 	facilities
shall 	exclude 	individual 	wastewater 	systems.
"Wastewater system" 	means 	the 	category of 	all
wastewater and wastewater 	sludge 	treatment, 	use, 	and
disposal 	systems, 	including 	all 	wastewater treatment
works, 	collection systems, 	wastewater 	sludge
facilities, 	recycled water systems, 	and individual
wastewater systems.
"Water pollution" 	has 	the 	same meaning as 	defined
in 	section 342D-1, 	HRS.
"Watertight" 	means 	constructed so 	that 	no 	water
can enter and discharge 	except 	through 	the 	inlet 	and
outlet 	pipe 	respectively. 	(Eff 	12/10/88; 	am 	8/30/91;
am 	and comp 12/09/04; 	am and comp 	MAR 2 1 2016 	J
(Auth: 	HRS 	§§321-11, 	32B(a), 	342D-1, 	342D-4, 	342D-5)
(Imp: 	HRS 	§§321-11, 	322-1 	to 	322-4, 	322-8, 	342D-l,
342D-2, 	342D-4, 	342D-5, 	342D-50, 	342E-3; 	40 	CFR Parts
501, 	503, 	40 	CFR 	§501.2)
§11-62-04 	County wastewater 	advisory committee.
(a) 	The mayor of 	each county may 	request 	that 	the
director 	form 	a 	county wastewater 	advisory committee
( 11 committee 11 ), 	and 	the 	mayor may nominate 	its 	members,
who may include 	representatives 	of 	the 	county water
supply, 	public 	works, 	planning, 	and 	land utilization
departments, 	labor, 	industry, 	environmental 	groups,
and other 	interested people. 	The 	chief 	of 	the
environmental 	management 	division on Oahu 	and 	the
district 	environmental 	health program chiefs 	on 	the
neighbor 	islands 	shall 	serve 	as 	ex officio members 	of
their 	respective 	county committees. 	The department
shall 	provide 	technical 	and 	support 	services 	for 	the
committee.
(b) 	The primary role 	of 	the 	committee 	is 	to
review and make 	recommendations 	to 	the 	director 	on the
application of 	this 	chapter on matters which 	are
unique 	to 	each county, 	on the 	establishment 	of
critical 	wastewater 	disposal 	areas, 	on proposals 	which
are 	not 	specifically addressed in 	these 	rules, 	and
upon 	the 	director's 	request, 	for 	applications 	for
variances . 	The 	committee 1 s 	recommendations 	shall 	seek
to 	advance 	the 	purposes 	of 	this 	chapter.
62-17
I~ 17 6
317 b
11-62-05 •
( Eff 	12/10/88; 	am 	8/30/91; 	am and comp 	12/09/2004; 	am
and 	comp 	MAR 2 I 2016 	] 	(Auth ; 	HRS 	§§321-
11 1 342D-4, 	342D-5) 	(Imp: 	HRS 	§ §321-11, 	322-1 	to 322-4,
322-8, 	342D-2, 	342D-4, 	342D-5 1 	342D-50)
§11-62-05 	Critical 	wastewater disposal 	areas
(CWDA). 	(a) 	All 	areas 	of 	the 	State 	are 	critical
wastewater disposal 	areas.
(b) 	The 	director may 	impose 	more 	stringent
requirements 	than 	those 	specified 	in 	this 	chapter 	for
wastewater 	systems 	located 	or proposed to 	be 	located
within 	areas 	that 	require 	additional 	protection .
Requirements 	that 	the 	director may 	impose 	include, 	but
are 	not 	limited to, 	meeting 	higher 	effluent 	standards
for 	wastewater 	systems, 	limiting 	the 	method of
effluent 	disposal, 	and 	requiring 	flow 	restriction
devices 	on water 	fixtures. 	[Eff 	12/10/88; 	am 8/30/91 ;
am and 	comp 	12/09/04; 	am and comp 	MAR 2 I 2016 	l
(Auth: 	HRS 	§§321-11,342D-4, 	342D-5) 	(Imp: 	HRS 	§§321-
11, 	322-1 	to 	322-4 , 	322-8, 	342D-2, 	342D-4 , 	342D-5 ,
342D-50)
§11-62-06 	General 	requirements. 	Owners 	shall
comply with these 	requirements : 	(a) 	All 	buildings 	used
or 	occupied as 	a 	dwelling, 	all 	public 	buildings, 	and
all 	buildings 	and places 	of 	assembly generating
wastewater 	or with 	toilets, 	sinks , 	drains, 	or other
plumbing 	fixtures 	capable 	of 	conveying wastewater,
shall 	be 	connected to 	a 	wastewater 	system. 	In
addition, 	any new building 	capable 	of 	generating
wastewater 	shall 	be 	connected 	to 	a 	wastewater 	system
which meets 	the 	requirements 	of 	this 	rule.
(b) 	All 	buildings 	and places 	of 	assembly
generating wastewater 	or with 	toilets , 	sinks, 	drains,
or other plumbing 	fixtures 	capable 	of 	conveying
wastewater 	and 	located within or 	near 	an 	available
public 	sewer 	system as 	determined by 	the 	director ,
shall 	connect 	to 	the 	public 	sewer.
(c) 	All 	wastewater 	systems 	shall 	be 	designed,
constructed, 	operated , 	and maintained 	in 	accordance
with 	this 	chapter.
62-18
§11-62-06
(d) 	Operation and maintenance. 	All 	wastewater
systems 	and parts 	thereof 	that 	are 	installed or used
by persons 	to achieve compliance with 	this 	chapter 	and
the 	conditions 	of 	any department 	approval 	for 	use
issued under 	this 	rule 	shall 	at 	all 	times 	be properly
operated and maintained. 	Proper operation 	and
maintenance 	includes 	adequate 	laboratory controls 	and
appropriate 	quality assurance 	procedures 	as 	specified
by the 	director. 	Effluent 	testing 	for private
wastewater systems 	shall 	be performed by an
independent 	laboratory. 	Proper operation 	and
maintenance 	also 	includes 	operation of 	any 	required
back-up 	or 	auxiliary facilities 	or 	similar 	systems 	as
specified by 	the 	director 	to be 	installed 	to 	achieve
compliance with this 	chapter and 	the 	conditions 	of 	any
department 	approval 	for 	use 	issued under 	this 	chapter.
(e) 	No holding 	tank, 	except 	for 	public
facilities, 	and no privy 	shall 	be used. 	No 	portable
toilets 	shall 	be used 	for 	any permanent 	structure
unless 	approved by the 	director.
(f) 	No 	person or the 	owner 	shall 	cause 	or 	allow
any wastewater 	system to create 	or 	contribute 	to 	any
of 	the 	following:
(1) 	Human 	illness;
(2) 	Public 	health hazard;
(3) 	Nuisance;
(4) 	Unsanitary condition;
(5) 	Wastewater 	spill, 	overflow, 	or 	discharge
into 	surface 	waters 	or the 	contamination 	or
pollution of 	state waters, 	except 	in
compliance with a 	permit 	or variance 	issued
under chapter 	11-55, 	or a 	water 	quality
certification or waiver 	obtained under
chapter 	11-54;
(6} 	A wastewater 	spill, 	overflow, 	or discharge
(spill) 	onto 	the 	ground, 	except 	for 	R-1
water 	from 	a 	recycled water 	system that 	is
implementing BMPs 	approved by the 	director.
The 	burden of 	proof 	is 	on 	the 	recycled water
system's 	owner or 	operator 	to 	demonstrate
that 	the 	spill 	qualifies 	for 	this 	exception;
62-19
B176
§11-62-06
(7) 	Harborage 	of vectors, 	including 	insects 	and
rodents;
( 8)
( 9)
( 10)
Foul 	or noxious 	odors ;
Public 	safety hazard; 	or
Contamination, 	pollution, 	or 	endangerment 	of
drinking 	waters, 	except 	in 	compliance 	with a
permit 	issued under 	chapter 	11-23.
(g} 	Notice. 	If 	any of 	the 	conditions 	in
subsection 	(f} 	exist , 	the owner 	or 	the 	person
responsible 	for 	the 	wastewater 	system 	shall 	notify the
director 	immediately , 	unless 	for 	subsection 	(f) (S} 	and
(f} (6), 	the 	owner or person responsible 	demonstrates
compliance 	with the 	protocol 	attached 	to 	this 	chapter
as Appendix B, 	entitled Responses 	for 	Wastewater
Spills, 	Overflows, 	and Discharges 	( " Spills") 	dated
July 1, 	2014.
(h) 	In case 	of 	a 	violation of 	this 	chapter, 	the
director, 	at 	the 	director's 	discretion , 	shall 	initiate
enforcement 	action against 	the 	owner(s} 	of 	the
wastewater 	system and 	initiate 	enforcement 	action
against 	other persons 	to 	have 	the 	offending 	condition
abated, 	corrected , 	or 	removed. 	In addition, 	once 	a
violation of 	this 	chapter 	occurs, 	the 	director 	shall
order 	the 	owner 	to 	take 	immediate 	actions 	to protect
public health 	and 	safety.
(i) 	Duty to 	mitigate . 	The 	owners 	of 	wastewater
systems 	shall 	take 	steps 	to minimize 	or prevent 	the
use 	and disposal 	of 	wastewater 	or wastewater 	sludge 	in
violation of 	this 	chapter which has 	a 	reasonable
l ikelihood of 	adversely affecting human health or 	the
environment.
(j) 	Upon 	request 	by the 	director, 	proposed
wastewater 	systems 	in 	critical 	wastewater disposal
areas 	shall 	be 	approved in writing or by rule 	by the
respective 	county board of 	water 	supply or department
of 	water 	supply .
(k) 	If 	applicable , 	a 	wastewater 	system 	involving
the 	subsurface 	d i sposal 	of 	wastewater 	shall be 	in
compliance 	with 	chapter 	11-23.
(1) 	Approvals 	to-construct 	the 	wastewater 	system
shall 	be 	considered 	invalid 	if:
(1) 	A county does 	not 	issue 	a 	building permit
for 	a 	private 	building within one year 	after
62-20
I} 176 	· ,
§11-62-06
the 	director approves 	the wastewater system,
or the 	construction of 	the wastewater system
has 	not 	begun within one year of 	the
approval; 	and
{2} 	A county revokes 	or 	rescinds 	a 	building
permit 	and 	the 	building 	is 	to be 	served by a
wastewater 	system that 	was 	approved 	in
conjunction with 	the 	building permit
application. 	Reapproval 	of 	any wastewater
system for 	which 	the 	director's 	approval 	has
been rescinded or determined 	invalid
pursuant 	to 	this 	paragraph 	shall 	be 	based on
the 	applicable 	rules 	in effect 	at 	the 	time
the 	request 	for 	reapproval 	is 	made.
(m} 	The director, 	at 	the 	director 1 s 	discretion, 	may
require 	that 	a 	wastewater 	system be upgraded 	to meet
the 	applicable 	requirements 	of 	this 	chapter whenever 	a
building modification 	is proposed 	that 	may change the
nature 	or quantity of 	the wastewater 	flowing 	to 	the
wastewater 	system. 	The modifications 	may 	include but
not 	be 	limited to adding 	additional 	bedrooms 	to a
dwelling or 	adding a 	restaurant 	to 	a 	shopping 	complex.
The 	director, 	at 	the 	director's 	discretion, 	may also
require 	that 	a 	wastewater 	system be upgraded if 	any of
the 	following 	conditions 	exists:
{1} 	The 	existing wastewater 	system has 	created
or 	contributed to 	any of 	the 	conditions
noted in 	subsection 	{f};
{2} 	The 	existing wastewater 	disposal 	system has
within the 	last 	twelve 	months been pumped
more 	than 	twice 	or has 	spilled wastewater
more 	than once;
{3) 	The 	existing wastewater 	system disposes
untreated wastewater directly 	into the
groundwater 	table; 	or
{4} 	The 	owner 	of 	the 	existing wastewater 	system
has 	not 	satisfactorily addressed all 	of 	the
deficiencies 	noted by the 	director.
(n} 	Modifications 	to wastewater 	systems 	that 	may
affect 	the 	quality or quantity of 	the wastewater and
wastewater 	sludge 	shall 	meet 	the 	applicable provisions
of 	this 	chapter.
62-21
B176
§11-62-06
(o) 	Actions 	taken by 	the 	director 	to 	evaluate
and determine 	possible measures 	to 	achieve 	compliance
with 	this 	chapter do 	not 	guarantee 	that 	an 	approved
wastewater 	system will 	function 	satisfactorily 	for 	any
period 	of 	time, 	or mean 	that 	department 	employees 	are
liable 	for 	any damages, 	consequent i al 	or 	direct, 	that
are 	or may be 	caused by a 	malfunction 	of 	the
wastewater 	systems.
(p) 	Duty to 	comp l y. 	The 	owners 	of 	any
wastewater 	system 	shall 	comply with 	all 	applicable
provisions 	of 	this 	chapter. 	I n 	addition, 	all 	owners
shall 	comply with all 	conditions 	of 	any department
approval 	for 	use 	issued under 	this 	chapter. 	Any
noncompliance 	constitutes 	a 	violation 	and 	is 	grounds
for : 	enforcement 	action; 	depart ment 	approval 	for 	use
termination, 	revocation 	and 	reissuance, 	or
modification; 	or denial 	of 	a 	department 	approval 	for
use 	renewal 	application.
(q) 	In cases 	where 	the 	director 	is 	required 	to
conduct 	an 	inspection at 	a 	location outside 	the 	State,
the owner of 	the 	wastewater 	system 	shall 	be 	required
to 	cover 	all 	costs 	related 	to 	the 	inspection. [ Eff
12/10/88; 	am 	8/30/91; 	am and comp 	12/09/04; 	am 	and
comp 	UAR 21 2n11', 	] 	(Auth: 	HRS 	§§321-11,
322-8 (a), 	34:2'0:.4, 	342b-5, 	342D-15, 	342E-3) 	{Imp: 	HRS
§§321-11, 	322-1 	to 	322-4, 	322-8 , 	342D-2, 	342D-4, 	342D-
5, 	342D-6, 	342D-50, 	342E-3 ; 	HRS 	chs. 	340E; 	33 	U. S.C .
§§1311, 	1342, 	1345; 	40 	CFR Parts 	122 , 	1 23, 	40 	CFR
§501.15 {b) (6))
§11-62-07 	REPEALED 	[R 8/30/91]
§11 - 62-07 . 1 	Requirements 	for 	non-domestic
wastewater. 	(a) 	The 	director will 	review 	the 	use 	and
disposal 	of 	non-domestic wastewater on a 	case-by-case
basis.
(b) 	Non-domestic 	wastewater includes, 	but 	is 	not
limited 	to:
(1) 	Wastewater 	from agricultural, 	commercial, 	or
industrial 	activities 	or 	operations;
62-22
§11-62-07.1
(2) 	Solids, 	semi-solids, 	or 	liquids 	removed 	from
the non-domestic wastewater;
(3) 	Wastewater 	that 	contains 	a 	mix of 	both
domestic 	and non-domestic 	wastewater; 	or
(4) 	Solids, 	semi-solids, 	or 	liquids 	removed 	from
wastewater 	that 	contains 	a 	mix of 	both
domestic 	and non-domestic 	wastewater.
(c} 	Buildings and operations 	generating non-
domestic wastewater, 	including 	farms, 	shall 	meet 	the
specific requirements 	of 	this 	chapter 	as 	determined 	to
be 	applicable by the 	director.
(1) 	Wherever 	applicable, 	the 	director 	shall 	use
the 	requirements 	for 	non-domestic wastewater
as 	set 	forth 	by the 	EPA, 	Chapter 11-23, 	the
Department's 	Guidelines 	for 	the 	Treatment
and Reuse 	of 	Recycled Water, 	and wherever
applicable, 	Department's 	Guidelines 	for
Livestock Waste Management. 	The Guidelines
are 	available on-line 	at 	the Wastewater
Branch section of 	the 	department's website.
Construction plans 	and engineering 	reports
for proposed non-domestic wastewater 	systems
shall 	be 	sufficient 	in 	scope 	and depth 	for
determining 	compliance with 	the 	provisions
of 	this 	chapter.
(2) 	Any building or 	facility which 	is 	located
within the 	state 	agricultural 	land use
district, 	county agricultural 	zoned
districts, 	or 	conservation 	districts 	may be
exempt 	from 	the 	provisions 	of 	subchapters 	2
and 	3 	for 	its non-domestic wastewater
provided that 	the 	buildings 	or 	facilities
are 	essential 	to 	the 	operation 	of 	an
agricultural 	enterprise 	or 	consistent 	with
the 	conservation district 	use 	intent. 	The
owner 	shall 	submit 	for 	the 	director's
approval 	plans 	or 	engineering 	reports, 	or
both, 	for 	the 	wastewater 	systems 	proposed to
accommodate 	the wastewater generated 	from
any building or 	facility 	in this 	category.
Information 	submitted 	shall 	be 	sufficient 	in
scope 	and depth 	for 	determining 	the 	adequacy
62-23
•3116 • 4
' '
§11-62-07 . 1
of 	performance 	of 	the 	wastewater 	system in
meet i ng 	the 	provisions 	of 	this 	chapter.
(d) 	In determining treatment 	requirements 	for
the 	non-domestic 	wastewater, 	the 	director 	shall 	use
requirements 	for non-domestic wastewater as 	set 	forth
by EPA, 	Chapter 	11-23, 	the 	Department's 	Guidelines 	for
the 	Treatment 	and Reuse 	of 	Recycled Water and 	the
Department's 	Guidelines 	for 	Livestock Waste
Management. 	[Eff 	and comp 	12/09/04; 	am and 	comp
MAR 21 2016 	] (Auth: 	HRS 	§§321-11, 	322-
8 (a), 	342E-3) 	(Imp: 	HRS 	§§321-11, 	322-1 	to 	322-4,
322-8, 	342E-3)
§11-62-08 	Other 	requirements 	for 	wastewater
systems. 	(a) 	Purpose .
(1) 	It 	is 	the 	purpose 	of 	this 	section and
subchapters 	2, 	3 , 	and 4 	to 	set 	forth 	minimum
requirements 	for 	the 	following purposes :
(A) 	To clarify responsibilities 	of 	owners ,
engineers, 	and 	the 	department;
(B) 	To 	set 	minimum distance 	requirements 	so
that 	nuisances 	are 	avoided;
(C) 	To 	set 	minimum requirements 	to protect
public 	health, 	safety, 	and welfare, 	and
to 	protect 	the wastewater 	systems 	from
malicious 	damage or unauthorized 	entry;
and
(D) 	To 	emphasize 	the need 	for 	proper
design, 	installation, 	operation , 	and
maintenance .
(2) 	This 	section and subchapters 	2, 	3 , 	and 	4
give 	the 	engineer 	designing 	the wastewater
system 	flexibility 	and design
responsibility. 	The 	design engineer 	is
responsible 	for 	the 	choice 	of 	equipment ,
types 	of 	treatment processes 	used,
structural 	integrity, 	electrical 	components,
disposal 	system designs, 	adequate work
space, 	accessibility for 	operation ,
maintenance 	and 	repair, 	redundancy of major
equipment 	and 	processes, 	corrosion control ,
62-24
§11-62-08
and all 	other major 	aspects 	of 	wastewater
system design.
(3) 	Nothing 	in this 	chapter 	shall 	be 	construed
to 	prevent 	the 	engineer 	from 	exceeding 	the
minimum requirements 	if 	the 	engineer
determines 	that 	specific 	conditions 	warrant
such additional 	measures.
(b) 	No 	person 	shall 	construct, 	modify the
construction of, 	or modify the 	use 	of 	a 	wastewater
system without 	the 	approval 	of 	the 	director. 	The
following 	documents 	shall be 	submitted to 	the director
prior 	to 	such approval:
(1) 	Construction plans prepared by or under 	the
supervision of 	an engineer 	indicating 	the
following:
(A) 	Acreage, 	address, 	and 	tax map key
number(s) 	of 	the 	project 	site;
(B) 	Plot 	plan drawn 	to scale 	showing 	the
location of 	the 	proposed and any
existing wastewater 	system and its
distances 	from existing 	and proposed
buildings, 	structures, 	legal
boundaries, 	property 	lines, 	adjacent
surface bodies 	of 	water, 	drinking water
sources, 	and existing public sewers
within 2,000 	feet 	of 	the 	nearest
property 	line; 	and
(C) 	Sufficient 	details 	to 	show compliance
with all 	applicable 	requirements 	of
this 	chapter.
(2) 	Construction plans 	for 	an 	individual
wastewater system prepared by the 	engineer
showing sufficient 	details 	to 	enable 	the
contractor to 	construct 	the 	individual
wastewater 	system.
{3) 	Wastewater 	sludge use 	and disposal 	plan
indicating how the wastewater 	sludge
facility will 	comply with 	subchapter 	4.
{c) 	Whenever 	applicable, 	the 	design 	flow 	of 	any
development 	to 	be 	served by a 	wastewater 	system shall
be 	based on Appendix D, 	Table 	I, 	dated July 1, 	2014,
except 	as 	provided by section 11-62-24(b).
62-25
B176
1317 6
§11-62-08
(d) 	Measures 	to 	control 	public 	accessibility to
all 	treatment 	units 	sha l l 	be provided 	to 	prevent
accidents, 	drownings, 	vandalism, 	and 	interference 	with
the 	treatment process . 	At 	a 	minimum , 	the 	provisions
shall 	include:
{1) 	Fencing or other 	secured 	enclosures 	at 	least
six feet 	in height with no more 	than 	three
and a 	half 	inch 	clear openings 	or 	spaces 	for
treatment 	units 	with exposed water 	surfaces
or 	equipment; 	or
(2) 	Completely enclosed treatment 	units 	with
unexposed 	water 	surfaces 	and equipment.
Access 	openings 	to completely enclosed
treatment 	unit(s) 	and 	equipment 	shall 	be
secured and properly 	identified, 	and 	be
large 	enough to 	allow 	removal 	of 	equipment
from 	the 	facility .
(e) 	No 	person 	shall 	use 	the 	area 	adjacent 	to 	or
directly 	above 	any wastewater 	system 	for 	purposes 	or
activities 	which may hinder 	or 	interfere 	with the
operation 	and maintenance , 	modification, 	or
replacement 	of 	the 	wastewater 	system.
(f) 	No 	person 	shall 	operate 	a 	wastewater 	system
unless 	that 	person or 	the 	owner of 	the 	wastewater
system 	is 	authorized by the 	director 	in accordance
with the 	applicable provisions 	of 	sections 	11-62-
23.l(e) 	and 	11-62-31.l(f) 	and 	the 	applicable
provisions 	of 	chapter 11-61 . 	The 	director may 	inspect
the 	wastewater 	system or 	its 	site 	at 	any time 	before
authorizing 	the 	use 	of 	the 	system 	and may 	require
advance 	notice of 	the 	engineer's 	inspection .
(g) 	All 	wastewater 	systems 	shall 	be 	constructed
or modified by a 	person meeting 	the 	requirements 	of
chapter 	444, 	HRS , 	and any pertinent 	rules 	adopted by
the 	department 	of 	commerce 	and consumer 	affairs, 	State
of Hawaii. 	[Eff 	8/30/91; 	am and comp 	12/09/04; 	am and
comp 	MAR 2 I 2016 	] 	(Auth : 	HRS 	§§321-11, 	342D-4,
342D-5, 	342E-3) 	(Imp: 	§§321-11, 	322-1 	to 	322-4, 	322-8,
342D-2, 	342D-4 , 	342D - 5, 	342D-6, 	342D-50, 	342E-3)
6 2- 26
§11-62-10
§11-62-09 	Public 	access 	to 	information. 	(a)
The 	following 	information 	is 	available 	for 	public
inspection:
(1) 	The 	name 	and address 	of 	any person 	seeking
or 	obtaining registration, 	an 	individual
permit, 	or department 	approval 	for 	use 	of 	an
individual wastewater 	system; 	and
(2) 	Registration information 	and 	forms,
registrations, 	individual 	permit
applications 	and permits, 	department
approval 	for 	use 	of 	an 	individual wastewater
system, 	sludge 	and effluent 	data, 	and
reports 	required 	to be 	submitted under 	this
chapter. 	This 	includes 	information
submitted on the 	forms 	themselves 	and any
attachments used 	to 	supply information
required by the 	forms.
(b) 	This 	section 	is 	not 	intended to 	limit
chapter 92F, 	HRS, 	or any other 	law requiring 	the
disclosure 	of 	information.
(c) 	Applications 	for 	request 	for 	public
information regarding wastewater 	system shall 	be 	made
in writing on 	forms 	furnished 	by the 	director. 	At 	a
minimum, 	the 	application 	shall 	identify where 	the
wastewater system 	is, 	including when possible 	the
applicable 	street 	address 	to 	and 	tax map key of 	the
lot, 	and a 	mailing address 	which the 	information 	is 	to
be 	sent. 	[Eff 	and comp 12/09/04; 	am and 	comp
MAR 21 2016 	] 	(Auth: 	HRS 	§§91-2, 	92-21,
342D-4, 	342D-5, 	342D-14) 	(Imp: 	HRS 	§§91-2 , 	92-21 ,
342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-14, 	342D-55)
§11-62-10 	Public 	hearings 	and 	informational
meetings. 	(a) 	The 	director may hold a 	public hearing
in 	the 	director 1 s 	discretion, 	when 	such 	a 	hearing may
help 	the 	director's 	decision on 	a 	matter 	regulated by
this 	chapter or 	for 	another 	reason which 	the 	director
considers 	to 	be 	in the 	public 	interest.
(b) 	The 	director may hold 	a 	public 	informational
meeting 	when 	the 	director 	considers 	it 	to 	be 	in 	the
public 	interest . 	[Eff 	and comp 	12/09/04; 	comp
62 - 27
,, 17 6
§11-62-11
MAR 21 2016 	] 	{Auth: 	HRS 	§§342D-4, 	342D-
s, 	342D-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5, 	342D-
6, 	342D-57; 	40 	CFR Part 	501, 	§501.lS{d) (7))
§11-62-11 	Incorporation by reference.
Appendices A through 	E, 	dated July 	1 1 	2014, 	located 	at
the 	end of 	this 	chapter, 	are 	made 	a 	part 	of 	this
chapter. 	[Eff 	and 	comp 	12/09/04; 	am and comp
MAR 21 2016 	] 	(Auth : 	342D-4, 	342D-5) 	(Imp:
342D-4 , 	342D-5, 	342D-6)
§11-62-12 	Timely processing . 	(a) 	This 	section
applies 	to 	applications 	for 	a 	permit, 	license,
certificate , 	or any 	form 	of 	approval 	required 	under
this 	chapter.
{b) 	The 	director 	shall 	approve, 	approve 	wi th
conditions, 	or deny a 	complete 	application and notify
the 	applicant 	accordingly within 	one 	hundred eighty
days 	of 	the 	receipt 	of 	the 	complete 	application.
Otherwise, 	the 	application 	is 	deemed automatically
approved on 	the 	one hundred 	eighty-first 	day .
{c) 	The director 	shall 	determine 	and notify an
applicant 	of 	the 	completeness 	or 	deficiency of 	an
application 	covered by this 	section, 	including payment
of 	required 	fees, 	within 	forty-five 	days 	of 	rece i pt 	of
the 	application. 	Failure 	by 	the 	applicant 	to provide
additional 	information, 	pay the 	fees, 	or 	correct 	a
deficiency 	for 	completeness 	of 	the 	application 	is
sufficient 	ground 	to 	suspend or 	terminate 	a 	review of
the 	application. 	The 	director 	shall 	determine 	and
notify 	an 	applicant 	of 	the 	completeness 	of 	a 	revised
application covered by this 	section, 	including payment
of 	required 	fees, 	within 	thirty days 	of 	receipt 	of 	the
revised 	completed 	application.
{d) 	Notice 	to 	the 	applicant 	shall 	be 	complete
upon mailing, 	facsimile 	transmission, 	or 	electronic
mail 	transmission .
{e) 	The 	period 	for 	the 	director's 	action
includes 	all 	ca l endar 	days, 	but 	if 	the 	period ends 	on
a 	Saturday, 	Sunday, 	or 	state 	holiday, 	the 	period
extends 	to 	the 	next 	working day .
62-28
~176 	, J
§11-62-23.1
(f) 	The 	one 	hundred eighty day period for 	the
director's 	action under subsection 	(b) 	applies 	to 	the
director's 	initial 	decision and notice. 	The 	initial
decision 	and notice 	do 	not 	become untimely if 	later
there 	is 	a 	reguest 	for 	hearing, 	an 	actual 	hearing, 	a
lawsuit, 	or 	other challenges 	to 	the 	initial 	decision
which 	prevents 	it 	from becoming 	final.
(g) 	The 	time 	for 	the 	d i rector ' s 	action and
notice 	to 	the 	applicant 	shall 	be 	extended when allowed
by 	section 91-13.5, 	HRS.
(h) 	Any action taken and any wastewater 	system
or 	sludge 	facility built, 	modified, 	or operated under
an automatic 	approval 	shall 	comply with all 	applicable
reguirements 	of 	this 	chapter, 	and 	the 	automatic
approval 	is 	effective 	for 	a 	period of 	one year. 	[Eff
10/21/00; 	comp 	12/09/04; 	am and com 	MAR 21 2016 	J
(Auth: 	HRS 	§§91-13.5, 	322-11, 	322-8(a), 	342D-4, 	342D-
5 ) 	( I mp : 	HRS 	§ 91-13 . 5 )
§11-62-21
§11-62-22
§11-62-23
SUBCHAPTER 2
WASTEWATER TREATMENT WORKS
REPEALED 	[R 	8/30/91]
REPEALED 	[R 	8/30/91]
REPEALED 	[R 8/30/91)
§11-62-23.1 	Specific 	requirements 	for 	wastewater
treatment 	works. 	(a) 	In 	addition to 	the 	requirements
of 	section 	ll-62-08(b), 	the 	following 	documents 	shall
be 	submitted to 	the 	director prior 	to 	approval 	to
construct 	the 	treatment 	works:
(1) 	A written declaration 	signed and dated by
the 	engineer 	that 	the 	proposed treatment
works 	was 	designed 	to meet 	all 	applicable
62-29
1317 6
3176 	11
§11-62-23.1
effluent 	requirements 	of 	sections 	11-62-26
and 	11-62-27; 	and
(2) 	Certification by the 	owner of 	a 	proposed
treatment 	works 	that 	the 	treatment 	works
shall 	be 	operated 	and maintained 	in
accordance with all 	of 	the 	provisions 	of 	the
operation 	and maintenance 	manual 	developed
pursuant 	to 	subsection 	(d) (2). 	The 	owner
shall 	certify that 	the 	operation 	and
maintenance manual 	shall 	be 	available 	to 	the
operator of 	the 	treatment 	works 	and 	shall
further 	certify 	that, 	upon 	sale 	or 	transfer
of 	ownership 	of 	the 	treatment 	works, 	the
sale 	or transfer 	will 	include 	construction
drawings, 	equipment 	manuals, 	operational
data 	collected, 	and 	the 	appropriate 	transfer
documents 	and provisions 	binding 	the 	new
owner 	to 	the operation and maintenance
manual .
(b) 	All 	treatment 	works 	shall 	be 	provided with a
continuous 	effluent 	flow measuring device 	such that
daily wastewater 	flow can be 	determined. 	For
treatment 	works 	with design 	flows 	equal 	to 	or 	greater
than 	100,000 	gallons 	per day, 	the 	continuous 	effluent
flow 	measuring 	device 	shall 	include 	recording
equipment 	to 	totalize or chart 	daily 	flows .
(c) 	Unless 	otherwise 	specified by 	the 	director,
the 	following 	distance 	requirements 	apply 	to 	all
treatment 	works :
(1) 	Treatment units , 	except 	as 	provided 	in
paragraph 	(3), 	shall 	not 	be 	less 	than
twenty-five 	feet 	from 	any property lines 	nor
less 	than 	ten 	feet 	from 	any building 	and
swimming pools;
(2) 	Disposal 	systems, 	excluding 	effluent
irrigation systems, 	shall 	not 	be 	less 	than
five 	feet 	from a 	property 	line 	nor 	less 	than
five 	feet 	from any building; 	and
(3) 	Completely enclosed, 	locked, 	and ventilated
equipment 	rooms 	used 	to 	house 	items 	such 	as
blowers, 	motors, 	pumps, 	electrical 	controls,
and 	chemical 	feeders 	shall 	not 	be 	less 	than
62-30
§11-62-23.1
five 	feet 	from property 	lines 	or 	less 	than
ten feet 	from dwelling 	unit(s).
(d) 	No 	person 	shall 	operate a 	treatment 	works
unless 	the 	following 	documents 	are 	provided:
(1) 	A written declaration 	signed and dated by
the 	engineer responsible 	for 	the 	preparation of 	the
operation 	and maintenance manual 	for 	the 	treatment
works, 	that 	the 	operation 	and maintenance manual 	meets
paragraph 	(2) 	and 	that 	if 	the 	treatment 	works 	is
operated 	in accordance with the manual, 	all 	applicable
effluent 	requirements 	will 	be met; 	and
(2) 	An operation 	and maintenance 	manual 	prepared
by the 	engineer. 	The manual 	as 	a 	minimum,
shall 	provide 	the 	details 	on 	the 	following:
(A) 	Operation and maintenance 	instructions
for 	each pump 	station and 	treatment
unit 	or process 	under normal 	and
emergency conditions 	such as power
outage 	and equipment 	malfunction;
(B) 	Operation and maintenance 	instructions
for 	the disposal 	system 	including
procedures 	for 	purging or 	chemical
"shock 	loading" 	to 	prevent 	or 	eliminate
biological 	growth 	in 	the 	subsurface
disposal 	system;
(C) 	List 	of 	required 	sampling 	frequencies
and analyses 	to 	be 	conducted by 	the
operator;
(D) 	Troubleshooting, 	corrective, 	and
preventive measures 	to 	be 	taken 	to
maintain process 	control 	and 	treatment
performance;
(E) 	Start-up procedures;
(F) 	Applicable 	state 	effluent 	requirements;
(G) 	Instructions 	on wasting 	and disposal 	of
wastewater 	sludge;
(H) 	Manpower requirements 	needed 	to 	operate
and maintain 	the 	treatment 	works;
(I) 	List 	of 	critical 	parts 	of 	the 	treatment
works;
(J) 	11 As-built 11 	drawings 	of 	the 	treatment
works;
62-31
1317 6
§11-62-23.1
(K) 	List 	of 	required daily activities ,
checks, 	and observations;
(L) 	Logs 	or report 	forms 	for 	al l 	operation
and maintenance 	activities performed;
(M) 	Flow schematic diagrams with details 	of
piping and valving;
(N) 	Plot 	plan of 	the 	treatment works 	and
Project 	site 	including 	all 	collection
lines 	and 	equipment;
(0) 	Details 	on 	all 	safety equipment 	at 	the
treatment 	works 	site, 	any applicable
spare 	parts, 	maintenance, 	and operation
instructions; 	and
(P) 	Details 	on 	all 	monitoring 	equipment
including 	spare parts, 	maintenance, 	and
ope r ating 	instructions.
(e) 	No person 	shall 	operate 	a 	treatment 	works
until 	it 	has 	been 	inspected to 	the 	director ' s
satisfaction and 	the 	d i rector 	has 	authorized 	in
writing 	the 	use 	of 	the 	treatment works.
(1) 	The 	owner ' s 	engineer 	shall 	inspect 	the
treat ment 	works 	and 	submit 	to 	the director 	a
final 	inspection 	report 	stating whether 	the
wastewater 	treatment 	works 	has 	been
constr u cted according 	to 	the 	submitte d 	plans
approved by 	the 	director 	and 	identify i ng 	any
discrepancies 	and 	their 	resolutions. 	Any
discrepancy between the 	constructed
treatment 	works 	and 	the 	approved plans 	is
sufficient 	reason 	to 	withhold approval 	to
operate 	the 	treatment 	works.
(2) 	Before 	operation of 	the 	treatment 	works, 	the
owner 	shall 	resolve 	all 	discrepancies.
(3) 	Any changes 	to 	the 	approved plan shall 	be
resubmitted 	to 	the 	director 	for 	approv a l
before 	the 	final 	inspection .
(4) 	The 	inspection 	shall 	not 	be 	considered 	final
until 	the 	constructed treatment works
conforms 	to 	the 	approved plans.
(f) 	After 	the 	first 	year of 	operation, 	the
owner's 	engineer 	shall 	submit 	t o 	the 	director a
written 	statement 	based 	on 	results 	of 	actual 	sampling
and 	professional 	judgment 	of 	whether or not 	the
62-32
§11-62-23.1
treatment 	works 	is 	meeting and at 	the design flow 	will
meet 	the 	applicable 	effluent 	requirements 	of 	sections
11-62-26 	and 11-62-27. 	If 	the 	treatment 	works 	is not
meeting 	the 	applicable 	effluent 	requirements, 	the
owner 1 s 	engineer 	shall 	submit 	to 	the director
a 	corrective 	action report 	containing:
(1) 	An analysis 	of 	the 	cause 	of 	the 	treatment
works 1 	failure 	to meet 	the 	effluent
requirements 	and an estimate of 	the 	scope 	of
the 	corrective 	action necessary to 	enable
the 	treatment 	works 	to 	be 	in compliance;
(2) 	A schedule 	for 	undertaking 	the 	corrective
actions; 	and
{3) 	A date 	by which the 	treatment works 	shall 	be
in 	compliance 	with 	the 	applicable 	effluent
requirements.
{g) 	Treatment 	works 	shall 	be 	designed with
safety in mind and comply with appropriate 	provisions
of 	the 	Occupational 	Safety and Health Standards 	of 	the
State 	of 	Hawaii, 	Department 	of 	Labor and 	Industrial
Relations.
(h) 	Upon abandoning, 	retiring, 	or pe,rmanently
discontinuing use 	of 	a 	treatment 	works, 	the 	owner
shall 	render 	it 	safe 	by removing 	it 	or 	filling 	it
completely with earth, 	sand, 	gravel, 	or 	similar non -
organic matter . 	All 	above 	ground portions 	of 	the
treatment 	works 	shall 	be 	rendered 	safe 	and vector
free. 	Electrical 	components 	shall 	be disconnected at
the 	circuit 	breaker or 	source 	and all 	access 	openings
sealed. 	Injection wells 	shall 	be 	abandoned 	in
accordance 	with chapter 11-23.
{i) 	For public 	wastewater 	treatment 	works, 	a
facility 	plan 	shall 	be 	initiated when 	the 	actual
wastewater 	flow 	reaches 	75 per 	cent 	of 	the 	design
capacity of 	the 	wastewater treatment works.
Implementation of 	the 	recommendation of 	the 	facility
plan 	shall 	be 	initiated when 	the 	actual 	wastewater
flow 	reaches 	90 	per 	cent 	of 	the 	design capacity of 	the
wastewater 	treatment 	works.
(j) 	The 	owner or 	operator 	shall provide 	standby
power 	for 	all 	lift 	stations 	to 	prevent 	unauthorized
discharges 	of 	wastewater 	during 	a 	primary power
outage.
62-33
1317 6
1) 1 7 6
§11-62-23.1
(k) 	For 	all 	treatment 	works 	which produce
recycled water, 	the director 	shall 	be 	guided by 	the
requirements 	of 	subchapter 1, 	other 	applicable
sections 	of 	this 	subchapter, 	and 	the Reuse 	Guidelines
for 	all 	decisions 	on production of 	recycled water.
[Eff 	B/30/91; 	am and comp 	12/09/04; 	am and 	comp
MAR 2 1 2016 	] 	(Auth: 	HRS 	§ §321-11, 	342D-4,
3 4 2 D- 5 ) 	( I mp : 	HRS 	§ § 3 21-11 , 	3 2 2 -1 	to 	3 2 2 - 4 , 	3 2 2 - 8 ,
342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-50)
§11-62-24 	Treatment 	unit 	requirements. 	(a) 	For
private wastewater 	treatment works 	of 	required 	design
capacities 	of 	less 	than 100,000 gallons 	per day:
(1) 	For 	sludge 	digesters 	or aerated 	sludge
holding tanks 	constructed 	after 	December 	10,
1988, 	the 	sludge 	digesters 	or 	aerated 	sludge
holding 	tanks 	shall 	treat 	and 	store 	at 	least
the 	amount 	of 	sludge 	generated 	over a 	twenty
day period;
(2) 	Except 	for 	subsurface 	disposal 	systems,
continuous 	disinfection of 	the 	treated
effluent 	shall 	be provided 	for 	treatment
works 	unless 	otherwise 	approved 	or 	ordered
by 	the 	director;
(3) 	For 	aeration tanks 	constructed 	after
December 	10, 	1988 , 	the 	aeration 	tank 	loading
shall 	not 	exceed 	12 . 5 	pounds 	of 	BODs per
1,000 	cubic 	feet . 	For 	the 	sequencing 	batch
reactor 	process , 	food 	to microorganism 	(F/M)
ratios 	shall 	be between 	0.05 	and 	0.10;
{4) 	For 	final 	settling tanks 	constructed 	after
December 	10 , 	1988, 	the 	detention 	time 	for
final 	settling 	tanks 	shall 	not 	be 	less 	than
four 	hours 	and 	the 	surface overflow 	rate
shall 	not 	exceed 300 	gallons 	per day per
square 	foot 	based on 	the 	average 	daily 	flow;
(5) 	For 	treatment 	works 	constructed after
December 	10, 	1988, 	flow equalization 	shall
be 	provided unless 	the 	engineer 	submits
written 	justification that 	changes 	in normal
daily 	flow 	rate 	or seasonal 	occupancy 	rates
62-34
§11-62-24
shall 	not 	affect 	the 	treatment 	unit's
ability to meet 	continuous 	compliance with
the 	effluent 	requirements 	of 	sections 	11-62-
25, 	11-62-26, 	and 11-62-27;
(6) 	For treatment works 	constructed after
December 10, 	1988, 	easy access 	shall 	be
provided 	for 	operators 	to 	allow necessary
operation, 	maintenance, 	and 	repair.
Completely enclosed 	treatment 	units 	with
unexposed water 	surfaces 	and 	equipment 	shall
not 	be allowed unless 	the 	design 	engineer
can 	satisfy the 	director 	that 	provisions
have 	been 	included 	to 	eliminate 	confined
space work areas 	and 	to 	allow accessibility
for 	necessary operation, 	maintenance, 	and
repair, 	and 	replacement; 	and
(7) 	For all 	treatment 	units 	utilizing gas
chlorination 	for 	disinfection, 	the 	following
equipment 	shall 	be provided: 	chlorine 	gas
leak detector 	and 	alarm, 	self 	contained
breathing 	apparatus, 	chlorine 	gas 	mask,
warning 	signs, 	and an 	emergency eyewash 	and
shower.
(b) 	New and proposed private 	wastewater
treatment 	works 	of 	required design 	capacity greater
than or 	equal 	to 	100,000 	gallons 	per 	day 	and new and
proposed county wastewater 	treatment 	works 	shall
comply with the 	design 	standards 	of 	their 	respective
counties. 	If 	a 	county does 	not 	have 	wastewater
treatment 	works 	design 	standards, 	then 	the 	design
standards 	of 	the 	City and 	County of 	Honolulu 	shall 	be
used. (c) 	Private 	wastewater 	treatment 	works 	with
design 	flows 	greater 	than 	or 	equal 	to 	100,000 	gallons
shall 	have 	solids 	dewatering 	equipment 	included in the
facility design. 	[Eff 	12/10/BB,. am 	B/30/91; 	am 	and
comp 12/09/04; 	am and comp 	MAR 21 2016 	] (Auth:
HRS 	§§321-11, 	342D-4, 	342D-S) 	(Imp: 	HRS 	§§321-11,
322-1 	to 	322-4, 	322-8, 	342D-2, 	342D-4, 	342D-5, 	342D-6,
342D-50}
62-35
317 6
1	317 6 t i
§11-62-25
§11-62-25 	Wastewater 	eff l uent 	disposal 	systems .
{a) 	New and proposed effl u ent 	disposa l 	systems .
(1) 	Effluent 	disposal 	systems 	shall 	at 	least
consist of a 	primary disposal 	component 	and
a 	separate 	100 per 	cent back-up 	disposal
component .
{2) 	The primary disposal 	component 	and 	the 	back-
up 	disposal 	component 	shall 	each 	be 	designed
to 	handle 	the 	peak 	flow. 	The 	peak 	flow
shall 	be determined 	in accordance 	with the
design 	standards 	of 	the i r 	respective 	county.
If 	a 	co u nty does 	not 	have 	design 	standards,
the 	design 	standards 	of 	the 	City and 	County
of 	Honolulu 	sha l l 	be 	used. 	Other means 	of
determining 	the 	peak f l ow, 	as 	recommended by
the 	design e n gineer , 	may be 	approved 	by the
director.
(3) 	Each disposal 	component 	shall 	be 	tested 	to
accommodate 	the wastewater 	flow 	as 	required
in paragraph 	(2).
(b) 	For 	t reatment 	works 	utilizing 	subsurface
disposal 	systems, 	design data and other pertinent 	data
shall 	be 	submi t ted 	to 	and 	approved by 	the 	director 	on
a 	case-by-case 	basis. 	Decisions by 	the 	director 	shall
be guided by 	subchapter 	1 	and other 	applicable
sections 	of 	this 	subchapter.
(c) 	All 	wastewater 	effluent 	disposal 	systems
shall 	include provis i ons 	to 	facilitate 	operation ,
maintenance, 	and 	inspection .
{d) 	All 	wastewater 	subsurface 	effluent 	disposal
systems 	and 	injection wells 	shall 	include provisions
for purging 	and 	chemical 	" shock loading" . 	[Eff
12/10/88 1 	am 	8/30/91; 	am and comp 	12/09/04; 	am and
comp 	MAH 2 1 2016 	] 	(Auth: 	HRS 	§§321-11, 	34 2 D-4,
342D-5) 	(Imp: 	HRS 	§§321-11 , 	322-1 	to 	322 - 4, 	322-8,
342D-2, 	342D-4, 	342D - 5, 	342D-6, 	342D-50)
§11 - 62-26 	Wastewater 	effluent 	requirements,
recycled water quality, 	monitoring, 	and 	reporting
requirements 	applicable 	to 	treatment 	works 	treating
domestic wastewater. 	{a) 	All 	treatment 	works 	shall
meet 	the 	applicab l e 	requirements 	of 	this 	section .
62-36
§11-62-26
Nothing 	in 	this 	section shall 	be 	construed to prevent
the 	engineer 	from applying more 	stringent 	requirements
if 	the 	engineer determines 	that 	the 	particular design
and 	circumstances 	for 	which 	the 	engineer 	is
responsible 	warrants 	the more 	stringent 	requirements.
(b) 	Treatment 	works' 	effluent 	and other
parameters 	shall 	be monitored as 	follows 	and 	shall 	not
exceed the 	following 	limits:
(1) 	Biochemical 	oxygen demand 	(BOD 5).
(A) 	For wastewater 	treatment 	works
excluding wastewater pond 	systems 	with
average daily flows 	greater 	than or
equal 	to 	100,000 	gallons 	per day, 	the
owner or operator shall perform
composite 	sampling at 	least 	weekly.
(B) 	For wastewater treatment 	works 	with
average daily flows 	less 	than 	100,000
gallons per day, 	the 	owner or
operator 	shall perform grab 	sampling at
least monthly.
(C) 	For wastewater pond 	systems with
average 	daily 	flows 	greater 	than or
equal 	to 	100,000 gallons 	per day, 	the
owner 	or operator 	shall 	perform grab
sampling at 	least 	weekly.
(D) 	The BODs 	in 	the 	effluent 	from 	a
treatment works 	shall 	not 	exceed 30
milligrams per 	liter based on 	the
monthly average 	of 	the 	results 	of 	the
analyses 	of 	composite 	samples.
(E) 	The 	BODs 	in 	the 	effluent 	from 	a
treatment 	works 	shall 	not 	exceed 	60
milligrams 	per 	liter based on a 	grab
sample.
(2) 	Suspended solids.
(A) 	For wastewater 	treatment 	works, 	except
for 	wastewater pond systems, 	with
average 	daily 	flows 	greater 	than or
equal 	to 	100,000 	gallons 	per 	day, 	the
owner or operator 	shall 	perform
composite 	sampling 	at 	least 	weekly.
62-37
,176
3176 	' 4
§11-62-26
(B) 	For wastewater 	treatment 	works 	with
average 	daily flows 	less 	than 	100,000
gallons per day, 	the 	owner 	or
operator shall perform grab 	sampling 	at
least 	monthly.
(C) 	For wastewater pond 	systems 	with
average daily flows 	greater 	than 	or
equal 	to 	100,000 	gallons per 	day, 	the
owner or operator 	shall 	perform 	grab
sampling 	at 	least 	weekly.
(D) 	The 	suspended solids 	in 	the 	effluent
from 	a 	treatment 	works 	shall 	not 	exceed
30 	milligrams per 	liter based on 	the
monthly average 	of 	the 	results 	of 	the
analyses 	of 	composite 	samples .
(E) 	The 	suspended solids 	in 	the 	effluent
from 	a 	treatment 	works 	shall
not 	exceed 60 	milligrams per 	liter
based on a 	grab 	sample.
(3) 	Owners 	or 	authorized 	agents 	shall 	submit
suspended solids 	and BODs lab data 	to 	the
director 	no 	later 	than 	thirty days 	after 	the
last 	day of 	June 	and December, 	unless 	the
data 	is 	already being 	submitted to 	the
Department 	under an NPDES permit 	by a 	public
agency.
(4) 	The dissolved oxygen, 	pH, 	and 	30 	minutes
settleability of 	the 	contents 	of 	the
aeration 	tank 	shall be 	sampled and analyzed
at 	least 	weekly.
(5) 	Effluent 	chlorine 	residual, 	if 	any, 	shall 	be
sampled and analyzed at 	least 	weekly.
(6) 	Total 	daily 	flow 	shall 	be 	monitored at 	least
weekly.
(7) 	The vo l ume 	of 	wastewater 	sludge 	wasted, 	the
solids 	concentration 	of 	wastewater 	sludge
wasted, 	the 	name 	of 	the 	wastewater 	sludge
pumping and hau l ing 	firm, 	and 	the 	dates 	of
pumping 	and 	hauling, 	if 	applicable, 	shall 	be
recorded.
(8) 	The operator 	shall 	maintain a 	log book or
records 	which shall 	include but 	not 	be
limited to: 	the 	date 	and 	time of 	operator
62-38
§11-62-26
entry, 	operating conditions, 	process 	control
testing performed, 	and any servicing or
preventative maintenance 	done 	while 	at 	the
wastewater treatment 	works.
{9) 	Alternative 	effluent 	limitations 	as
permitted by EPA regulations, 	{40 	CFR 125
and 40 	CFR 133), 	relating 	to 	the 	definition
of 	secondary treatment 	or other 	industrial
categories, 	may be 	utilized by 	the 	director.
{10) 	For 	the 	purposes 	of 	this 	section, 	the
arithmetic 	average of 	the 	results 	of 	the
analyses 	of 	composite 	samples 	shall 	be based
upon one 	or more 	analyses 	made within a 	30
consecutive 	calendar day period. 	The
arithmetic 	average 	shall 	be 	the 	sum of 	the
results 	of 	all 	analyses 	divided by 	the
number of 	analyses 	made 	during 	the 	30
consecutive 	calendar 	day period.
{11) 	For 	the 	purposes 	of 	this 	section, 	composite
samples 	shall 	consist 	of 	at 	least 	eight
sample 	aliquots, 	collected at 	periodic
intervals 	during 	the 	operating 	hours of 	the
facility 	over a 	24-hour period. 	The
composite 	sample must be 	flow proportional;
either the 	time 	interval 	between 	each
aliquot 	or 	the volume 	of 	each 	aliquot must
be 	proportional 	to 	either 	the 	stream 	flow 	at
the 	time 	of 	sampling 	or the 	total 	stream
flow 	since 	the 	collection of 	the 	previous
aliquot. 	Aliquots may be 	collected manually
or 	automatically.
{c) 	In 	addition 	to 	subsection 	(b), 	treatment
works 	producing R-1 	water or R-2 	water 	for 	recycled
water 	systems 	shall 	provide continuous 	disinfection of
the 	effluent 	as 	specified below unless 	otherwise
specified by the director.
(1) 	R-1 	water 	disinfection requirements.
(A) 	For 	chlorine disinfection process. 	The
disinfection process 	shall 	provide 	a 	CT
(the product 	of 	total 	chlorine 	residual
and modal 	contact 	time measured at 	the
same point) 	value 	of 	not 	less 	than 450
milligrams-minutes per 	liter 	at 	all
62-39
3176
§11-62-26
( 2)
(B)
R-2
(A)
(B)
times 	with a 	modal 	contact 	time 	of 	at
least 	ninety minutes based 	on peak dry
weather design 	flow; 	or
For non-chlorine 	disinfection
processes. 	The 	disinfection 	process
shall 	demonstrate 	to 	the 	director's
satisfaction 	the 	inactivation
and removal 	of 	99.999 per 	cent 	of 	the
plague 	forming 	units 	of 	F-specific
bacteriophage MS2 	or polio virus 	in the
wastewater.
water disinfection 	requirements .
For chlorine 	disinfection processes.
(i) 	A theoretical 	contact 	time 	of
fifteen 	minutes 	or more 	and an
actual 	modal 	time 	of 	ten minutes
or more 	throughout 	which 	the
chlorine 	residual 	is 	0.5
milligrams per 	liter 	or 	greater ;
and
(ii) 	Automatic 	con t inuous measuring 	and
recording 	of 	chlorine 	residual
shall 	be provided. 	Th e 	ch lorine
facilities 	s h all 	have 	adequate
capacity to maintain a 	residual 	of
2 	milligrams per 	liter .
For non-chlo r ine 	disinfection
processes.
(i) 	The disinfection proc e ss 	shall
demonstrate 	to 	the director's
satisfaction 	the ability to meet
the 	requirements 	o f 	s u bsect i on
(d) ( 2) ; 	and
(ii) 	Automatic 	controls 	shall 	be
provided 	to 	conti nu ously measure
and 	record disinfection dosage 	and
residuals, 	if 	any.
(3) 	Monitoring 	shall 	be 	by grab 	samples 	that
shall 	be 	taken 	at 	a 	point 	foll o wing
disinfection.
{d} 	In addition 	to 	subsections 	(b } 	and 	(c),
treatment 	works 	producing R-1 	water or R-2 	water 	for
recycled water 	systems 	shall 	meet 	the 	following 	daily
62-40
§11-62-26
fecal 	coliform requirements 	unless 	other sampling
frequencies 	are 	approved by the director. 	Monitoring
shall 	be 	by grab 	samples 	that 	shall 	be 	taken 	at 	a
point 	following 	disinfection.
(1) 	R-1 	water.
(A) 	The 	median density measured 	in 	the
disinfected effluent 	shall 	not 	exceed
2.2/100 	milliliters 	using 	the
bacteriological 	results 	of 	the 	last
seven days 	for 	which analyses 	have been
completed;
(B) 	The 	density shall 	not 	exceed 	23/100
milliliters 	in more 	than one 	sample 	in
any 	thirty day period; 	and
(C) 	The 	density in 	any one 	sample 	shall 	not
exceed 200/100 	milliliters.
(2) 	R-2 	water.
(A) 	The 	median density as measured in the
disinfected effluent 	shall 	not 	exceed
23/100 	milliliters 	using 	the
bacteriological 	results 	of 	the 	last
seven days 	for 	which analyses 	have been
completed; 	and
(B) 	The 	density of 	shall 	not 	exceed 200/100
milliliters 	in more 	than one 	sample 	in
any 	thirty day period.
(e) 	In addition to 	subsections 	(b) 	through 	(d),
treatment 	works 	producing R-1 	water 	for 	recycled water
systems 	shall 	provide 	continuous 	turbidity monitoring
and 	recording prior to 	the 	filtration 	process 	and at 	a
point 	after the 	filters 	and before 	application of 	the
disinfectant. 	The R-1 	water 	shall 	meet 	the 	following
turbidity 	limits:
(1) 	For 	filtration 	systems 	utilizing 	sand or
granular media, 	cloth, 	or other 	synthetic
media, 	the 	turbidity 	shall 	not 	exceed any of
the 	following:
(A) 	An average 	of 	two 	nephelometric
turbidity units 	(NTU) 	within 	a 	twenty-
four 	hour period;
(B) 	S NTU more 	than 	five 	percent 	of 	the
time 	within a 	twenty-four hour period;
and
62-41
0176
§11-62-26
{2) {C) 	10 	NTU at 	any 	time.
For 	filtration 	systems u t ilizing membrane
filtration, 	the 	turbi d ity 	shall 	not 	exceed
any of 	the 	following:
{A) 	0 .2 	NTU more 	than 	five 	percent 	of 	the
time 	within a 	twenty-four 	hour period;
and
{B)
(f) 	When
R-1 	facilities
shall 	apply:
0.5 	NTU at 	any 	time.
using media 	filtration 	for 	existing
the 	following 	performance 	criteria
(1) 	The 	design UV dose 	sha l l 	be 	at 	least 	100
mJ/cm 2 under maximum daily 	flow; 	and
(2) 	The 	filtered UV transmittance 	shall 	be 	55
percent 	or greater 	at 	254 	nanometers 	(nm).
(g) 	When 	using membrane 	filtration 	for 	existing
R-1 	facilities , 	the 	following 	pe r fo r mance 	criteria
shall 	apply:
{1) 	The 	design UV dose 	shall be 	at 	least 	80
mJ/cm2 	under maximum daily 	flow; 	and
{2) 	The 	filtered 	effluent UV 	transmittance 	shall
be 	65 	percent 	or 	greater 	at 	254 	nm .
{h) 	The minimum acceptable 	design 	requirements
and 	commissioning of 	new UV disinfection 	systems 	shall
comply with 	the 	Ultraviolet 	Disinfection Guidelines
for 	Drinking Water 	and Water Reuse, 	Third Edition,
2003, 	published by 	the 	National 	Water 	Research
Institute.
(g) 	The 	analysis, 	including 	the 	handling 	and
preservation 	of 	samp l es, 	to determine 	compliance 	with
effluent 	requirements 	shall 	be performed 	in accordance
with 	Standard Methods 	or EPA's Methods 	for 	Chemical
Analysis 	of 	Water 	and Wastes. 	The 	director may
approve 	alternative methods 	for 	analyzing 	the 	effluent
limits 	of 	this 	section . 	The 	alternative 	test 	methods,
when 	approved ~ may be used by the 	director 	to
determine 	compliance with 	effluent 	limits 	as 	stated 	in
this 	rule. 	[Eff 	12/10/88, 	am 	8/30/91; 	am and 	comp
12 / 09 / 04; 	am 	and 	comp 	MAR 2 1 2016 	] 	(Auth : 	HRS
§ § 3 21-11 , 	3 4 2 D- 4 , 	3 4 2 D- 5 ) 	( I mp : 	HRS 	§ § 3 21 -11 , 	3 2 2 -1
3176 	ff
to 	322-4, 	322-8, 	342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-
50)
62-42
§11-62-27
§11-62-27 	Recycled water 	systems. 	(a) 	No
recycled water 	system shall 	be 	constructed, 	used, 	or
modified without 	written approval 	by the 	director.
(b) 	In reviewing 	recycled water 	systems 	and 	in
addition 	to 	this 	chapter, 	the director 	shall 	be 	guided
by the 	Reuse Guidelines.
(c) 	Before 	using 	recycled water, 	the 	owner of
the 	recycled water 	system 	shall 	submit 	to 	the 	director
the 	following 	information:
(1) 	Name, 	address, 	and phone number of 	the 	owner
and party responsible 	for 	the 	application of
recycled water 	at 	the 	site 	(if 	different
from 	the owner);
(2) 	Clear 	identification of 	the 	people 	who 	will
actually operate 	and maintain the 	system, 	if
different 	from paragraph 	(1);
(3) 	Detailed site 	information on the 	water
recycling 	application 	site 	and 	its
surroundings, 	including 	site name, 	address,
and tax map key number(s), 	a 	map 	indicating
specific 	areas 	of 	use, 	areas 	of public
access, 	surrounding 	land use, 	location 	of
all 	wells within a 	one-fourth mile 	radius,
description of 	nearest 	housing or public
area, 	setbacks, 	general 	location of 	existing
and proposed water 	and 	sewer 	lines, 	the
direction of 	drainage 	with 	a 	description of
how 	the 	drainage 	will 	flow, 	and 	the 	depth 	to
groundwater underlying 	the 	irrigated 	area
with a 	description of 	the 	ground water
quality; 	and
(4) 	Information 	sufficient 	to 	show 	compliance
with the 	requirements 	of 	subsection 	(h), 	and
identification of best 	management 	practices.
(d) 	Before 	using 	recycled water, 	the 	owner 	of
the 	recycled water 	system 	shall 	also 	submit 	to 	the
director 	for 	approval 	an 	engineering report 	or
recycled water 	application. 	The 	report 	or
application 	form 	shall 	include the 	following
information and shall 	clearly identify all 	best
management 	practices 	to 	be 	implemented:
(1) 	An 	irrigation use 	plan 	that 	includes
information on 	application 	rates, 	intended
62-43
~176
§11-62-27
uses , 	and 	schedules 	for 	recycled water 	use.
The 	irrigation use 	plan 	shall 	also 	include
information on 	types 	of vegetation, 	types
and methods 	of 	irrigation, 	proposed
irrigation schedules, 	vegetative 	consumption
rates, 	water balance 	calculations, 	nutrient
balance 	calculations, 	and 	the 	corresponding
acreage 	to 	be 	used 	for 	irrigation;
(2} 	An overflow control 	plan 	that 	includes
detailed best 	management 	practices 	to
control 	or minimize 	runoff 	or ponding or
recycled water;
(3} 	A management 	plan 	that 	includes
establishment 	and delineation of 	the
responsibilities 	of 	operation and
maintenance of 	the 	recycled water 	system;
(4) 	A public 	information and 	access 	plan, 	to
minimize public 	contact 	with 	the 	recycled
water, 	that 	includes methods 	to 	adequately
inform the 	public 	that 	recycled water 	is
being used and 	that 	the 	recycled water 	is
unfit 	for 	human 	consumption; 	and methods 	to
control 	public 	access 	to 	the 	recycled 	water
system and areas 	of 	recycled water use ;
(5} 	A labeling plan 	to distinguish piping 	and
appurtenances 	which 	carry or 	contain
recycled water 	from 	those 	for 	potable 	water ;
(6) 	An 	employee 	training plan 	that 	describes 	the
training that 	the 	employees 	will 	receive 	to
ensure 	compliance 	with 	this 	chapter 	and any
other 	features 	specified by 	the 	director;
(7) 	A vector 	control 	plan 	(if 	applicable); 	and
(8) 	A groundwater monitoring 	plan 	(if
applicable}, 	including 	formulation 	of a
strategy for 	the 	observation 	and
surveillance 	of 	groundwater 	for possible
sources 	of 	pollution .
(e) 	For 	existing 	users 	of 	recycled water, 	the
owner of 	the 	recycled water 	system 	shall 	submit 	the
information 	and 	plans 	required in 	subsections 	(c) 	and
(d), 	except 	for 	the 	information contained in
subsection 	(d) (1) 	regarding 	the 	vegetative 	consumption
62 - 44
§11-62-27
rates 	and 	water balance, 	and subsection 	(d) (8)
regarding 	groundwater monitoring. 	For users 	of non
R-1 	recycled water 	spray irrigation 	systems, 	the 	owner
shall 	also describe 	the methods 	and 	controls used 	to
ensure 	that 	public 	contact 	with aerosols 	are
minimized.
(f) 	For new users 	of 	recycled water 	obtaining
access 	to 	an existing recycle water 	system, 	the 	user
shall 	submit 	the 	information and plans 	required 	in
subsections 	(c) 	and 	(d), 	except 	for 	the 	information
contained 	in 	(d) (1) 	regarding vegetative 	consumption
rates 	and water balance, 	and 	subsection 	(d) (8)
regarding 	groundwater monitoring. 	For users 	of 	non
R-1 	recycled water 	spray 	irrigations 	systems, 	the
owner 	shall 	also describe 	the methods 	and controls
used 	to 	ensure 	that 	public 	contact 	with aerosols 	are
minimized.
(g) 	For recycled distribution water 	systems, 	the
owner of 	the 	recycled water distribution 	system 	shall
submit 	an 	engineering report 	or 	recycled water
application containing the 	following 	information:
(1) 	Name, 	address, 	and phone number of 	the 	owner
and party responsible 	for 	the 	recycled water
distribution 	system 	(if 	different 	from 	the
owner);
(2) 	Information about 	the 	treatment 	works
supplying 	the 	recycled water, 	including 	the
name, 	address, 	tax map key number, 	and
owner's 	name;
(3) 	Maps 	showing the 	location of
distribution 	system 	layout.
also 	include 	the 	location of
sewer 	lines;
the
The maps 	shall
all 	water 	and
(4) 	A 	labeling plan 	to 	distinguish piping 	and
appurtenances 	which carry or 	contain
recycled water 	from 	those 	for 	potable 	water;
and
(5) 	A description 	of how 	the 	distribution 	system
complies 	with 	this 	chapter 	and 	the 	Reuse
Guidelines.
(h) 	The 	engineering 	report 	or 	application
required in 	subsection 	(d), 	(e), 	(f), 	or 	(g) 	plus 	any
other 	submittals 	shall 	contain 	sufficient 	information
62-45
0176
§11-62-27
to 	assure 	the director 	that 	the 	degree 	of 	treatment
and 	reliability is 	commensurate 	with 	the 	proposed use,
that 	the 	distribution 	and use 	of 	the 	recycled water
will 	not 	create a 	health hazard or 	nuisance, 	and 	that
the 	director 	is 	able 	to make 	decisions 	in 	accordance
with subsection 	{b) .
(i) 	For recycled water 	systems 	that 	use 	recycled
water, 	the 	owner of 	the 	recycled water 	system 	shall
operate 	the 	system in accordance 	with 	the 	requirements
of 	this 	chapter and 	to 	the maximum 	extent 	practicable
shall:
{1) 	Irrigate 	at 	a 	rate 	not 	greater 	than 	the
plants 	use 	it;
{2) 	Minimize 	recycled water 	runoff 	and 	ponding
on 	the ground ;
{3) 	Post 	signs 	or other devices 	warning 	the
public not 	to drink, 	swim, 	or 	otherwise 	come
into 	contact 	with the 	recycled water ;
(4) 	Keep 	the 	public away from 	the 	areas 	being
irrigated with 	recycled water;
(5) 	Clearly mark 	pipes, 	tanks, 	valves , 	and
equipment 	used 	in recycled water use 	systems
such that 	they 	are 	easily differentiated
from potable 	water systems ;
{6) 	Provide 	training 	to 	employees 	such 	that 	they
are 	aware 	of 	this 	chapter 	and 	any 	conditions
the 	director 	imposed on the 	recycled water
use 	system;
{7) 	Provide 	control 	measures 	to minimize vector
nuisances ; 	and
{8) 	Monitor 	groundwater 	as 	required by 	the
director.
( j) 	The 	owners 	of 	new, 	proposed, 	or modified
recycled water 	systems, 	where 	applicable, 	shall
provide 	adequate 	storage 	basin{s) 	or a 	backup 	disposal
system 	t o 	prevent 	any overflows 	or discharges 	from 	the
system when 	the 	irrigation system 	is 	not 	in operation
or when 	recycled water 	quantities 	exceed 	the
irrigation 	require ments .
(k) 	Spills, 	overflows , 	and discharges 	( 11 spills11 )
of 	recycled water 	shall 	be 	responded 	to as 	required 	by
section 	ll-62-06 (f ) 	and 	(g) 	and Appendix B, 	entitled
62-46
1	31 7 6 	, '
§11-62-28
Responses 	for Wastewater Spills, 	Overflows, 	and
Discharges 	("Spills"), 	dated July 1, 	2014.
(1) 	For recycled water 	systems, 	the 	owner or 	the
owner's 	duly authorized agent, 	unless 	otherwise
directed, 	shall 	report 	the 	following 	information 	to
the 	director:
(1) 	The volume of 	recycled water used, 	the
volume 	of 	recycled water 	stored, 	the volume
and 	location of 	any 	recycled water 	spills,
and details 	on 	the 	irrigated areas,
including water budgets, 	precipitation,
evaporation, 	application 	rates, 	and
monitoring of 	best management 	practices; 	and
(2) 	Reported 	information 	shall 	be 	submitted by
February 19 	of 	each year 	and 	shall 	be 	in 	a
monthly summary 	format 	for 	the 	preceding
calendar year 	unless 	otherwise 	specified 	or
agreed 	to 	by the 	director. 	[Eff 	and comp
12/09/04; 	am and comp 	MAR 2 I 2016
(Auth: 	HRS 	§§321-11, 	342D-4, 	342D-5) 	(Imp:
HRS 	§§321-11, 	322-1 	to 	322-4, 	322-8, 	342D-2,
342D-4, 	342D-5, 	342D-6, 	342D-50; 	33
U.S.C. 	§§1311, 	1342; 	40 	CFR 	Parts 	122, 	123)
Historical 	note: 	§11-62-27 	is 	based 	substantially
upon 	§11-62-25 (b) (1), 	(b) (2), 	and 	(c). 	[Eff 	12/10/88;
am and comp 	8/30/91)
§11-62-28 	Additional 	monitoring, 	recordkeeping,
and 	reporting. 	(a) 	The 	owners 	of 	treatment 	works 	or
the 	owners' 	duly authorized agents 	shall 	maintain
complete 	records 	of 	operation and maintenance,
repairs, 	replacements, 	and 	improvements 	performed or
installed at 	the 	treatment 	works.
(b) 	The 	monitoring 	results, 	reports, 	and all
records 	required 	in 	sections 	11-62-26 	and 11-26-27,
this 	section, 	and Appendix B, 	entitled Responses 	for
Wastewater Spills, 	Overflows, 	and Discharges
( 11 Spills 11 ), 	dated July 	1, 	2014, 	located at 	the 	end of
this 	chapter 	shall 	be 	kept 	on 	site 	and available 	for
the 	director's 	inspection 	for 	at 	least 	two years 	and 	a
copy made 	available 	to 	the 	director without 	charge
62-47
,317 6
317 6 	· ,H
§11-62-31.1
upon 	the director's 	request. 	[Eff 	and comp 	12/09/04;
am and comp 	MAR 2 1 2016
§§321-11, 	342D-4, 	342D-5) 	rrmp:
to 	322-4, 	322-8 , 	342D - 2, 	342D-4,
§§11-62-29 	{Reserved)
] 	{Auth: 	HRS
HRS 	§§321-11, 	322-1
342D-6, 	342D-50)
SUBCHAPTER 3
INDIVIDUAL WASTEWATER SYSTEMS
§11-62-31 	REPEALED 	[R 	B/30/91]
§11-62-31.1 	General 	requirements 	for 	individual
wastewater systems. 	(a) 	Individual 	wastewater
systems 	may be 	used as 	a 	temporary 	on-site 	means 	o f
wastewater disposal 	in 	lieu of 	wastewater 	treatme nt
works 	under 	the 	following 	cond i tions:
{1) 	Developments 	involving 	dwellings.
(A) 	There 	shall 	be 	10,000 	square 	feet 	of
land area 	for 	each 	individual
wastewa t er 	system;
(B) 	Total 	development 	of 	an 	area 	shall 	not
exceed fifty 	single 	family 	residential
lots 	or exceed fifty dwe l ling 	units
except 	for 	developments 	consisting of
one 	dwelling 	unit 	per 	acre 	or 	greater;
(C} 	Area of 	the 	lot 	shall 	not 	be 	less 	than
10, 0 00 	square 	feet , 	except 	for 	lots
cre a ted and recorded before August 	30,
1991. 	For 	lots 	less 	than 	10,000 	square
feet 	which were 	created and 	recorded
before August 	30, 	1991, 	only one
individual 	wastewater 	system 	shall 	be
allowed.
{D) 	The 	tota l 	wastewater 	flow 	into 	one
indivi du al 	wastewater 	system 	shall 	not
exceed one 	thousand gallons , 	and 	one
62-48
§11-62-31.1
individual 	wastewater 	system shall 	not
serve 	more 	than 	five 	bedrooms, 	whether
they are 	in one 	dwelling unit 	or 	two.
(2) 	Developments 	involving buildings 	other 	than
dwellings.
(A) 	There 	shall 	be 	10,000 	square 	feet 	of
usable 	land area 	for 	each 	individual
wastewater 	system. 	Usable 	land 	area
shall 	not 	include 	the 	area under
buildings;
(B) 	The 	total 	wastewater 	flow of 	the
development 	shall not 	exceed 15,000
gallons per day;
(C) 	Area 	of 	the 	lot 	shall 	not 	be 	less 	than
10,000 	square 	feet 	except 	for 	lots
created and 	recorded before August 	30,
1991. 	For 	lots 	less 	than 10,000 	square
feet 	which were 	created and 	recorded
before August 	30, 	1991, 	only one
individual wastewater 	system 	shall 	be
allowed; 	and
· en) 	The 	total 	wastewater 	flow 	into 	each
individual 	wastewater 	system 	shall 	not
exceed one 	thousand gallons 	per 	day.
(b) 	Whenever 	an 	individual 	wastewater 	system 	is
allowed under 	subsection 	{a), 	the 	following 	shall
apply:( 1)
{ 2)
The 	director may allow an 	individual
wastewater 	system other 	than 	a 	cesspool 	to
be 	used for 	two dwelling 	units which may 	or
may not 	be 	located within 	the 	same 	building,
provided that:
(A) 	Both of 	the 	dwelling units 	are 	located
on the 	same 	single 	family 	residential
lot; 	and
(B) 	The 	individual 	wastewater 	system used
shall 	meet 	the 	current 	requirements 	of
this 	chapter.
A building may use 	more 	than 	one 	individual
wastewater 	system where 	each 	individual
wastewater 	system 	shall 	connect 	to 	a 	single
dwelling 	unit.
62-49
317 6
§11-62-31 . 1
(3) 	For buildings without 	any dwelling 	units:
(A) 	More 	than one 	indivi d ual 	wastewater
system may be 	used provided that 	the
building 	is 	owned by one person; 	or
(B) 	Upon 	the director ' s 	discretion,
buildings 	may 	connect 	to 	one 	individual
wastewater 	system other 	than a 	cesspool
provided the 	buildings 	are 	located on
the 	same 	lot 	and 	the 	buildings 	generate
wastewater 	of 	similar 	strength and
character.
(4) 	For buildings , 	other 	than dwellings 	with
highly variable wastewater 	flow 	rates, 	such
as 	but 	not 	limited 	to 	schools, 	parks, 	and
churches, 	the 	individual 	wastewater 	system
excluding cesspools may exceed a 	design 	flow
rate 	of 	1000 gallons per 	day; 	provided that
the 	density does 	not 	exceed 	1000 	gallons 	per
day per 	10,000 	square 	feet 	of 	useable 	land
area 	and 	the 	development 	is 	owned by one
person.
(c) 	The 	director may 	require 	the 	installation of 	dry
sewers 	as 	a 	condition of 	approval 	of 	proposed
individual 	wastewater 	systems 	where:
(1) 	Public 	sewers 	exist 	but 	are 	at 	capacity such
that 	connection 	is 	prohibited but 	remedial
actions 	have been 	initiated to 	increase 	the
public 	sewer 	capacity;
(2) 	Public 	sewers 	exist, 	but 	the 	treatment 	and
disposal 	system 	is 	not 	complete 	or
operational;
(3) 	Design of 	the 	public 	sewers 	has 	been
completed and construction of 	the 	public
sewers 	is 	imminent; 	or
(4) 	Conditions 	warrant 	such 	requirements.
(d) 	No 	cesspool 	shall be 	u s ed 	as 	the 	wastewater
system by any new building . 	No new 	cesspools 	shall 	be
constructed after 	the 	effective 	date 	of 	this 	rule
unless 	they have 	been approved 	for 	construct i on before
the 	effective 	date 	of 	this 	rule.
62-50
§11-62-31.1
(e) 	Before 	the 	approval 	of 	the 	operation of 	an
individual wastewater 	system excluding cesspools, 	the
following 	requirements 	shall 	be 	satisfied:
(1) 	An operation and maintenance 	manual
developed pursuant 	to 	section 11-62-
23.l(d) (2) 	as 	applicable 	shall 	be 	submitted
and approved by the 	director; 	and
(2) 	The 	owner of 	the 	individual 	wastewater
system shall 	certify that 	the 	individual
wastewater 	system shall 	be operated 	and
maintained 	in 	accordance with all 	of 	the
provisions 	of 	the 	operation and maintenance
manual 	developed pursuant 	to paragraph 	(1).
The 	certification 	shall 	include 	a 	statement
that 	upon 	sale 	or 	transfer 	of 	ownership 	of
the 	individual 	wastewater 	system, 	the 	sale
or transfer 	will 	include 	the 	appropriate
transfer documents 	and provisions 	binding
the 	new owner 	to 	the 	operation 	and
maintenance manual.
(f) 	No 	person 	shall use 	an 	individual 	wastewater
system until 	authorized 	in writing by 	the 	director.
(1) 	Written 	approval 	to 	use 	an 	individual
wastewater 	system shall 	be 	issued 	if:
(A) 	The 	owner resolves 	all 	discrepancies
recorded as 	a 	result 	of 	any 	inspections
conducted.
(B) 	The 	engineer 	furnishes 	a 	final
inspection 	report 	to 	the 	director
within thirty days 	after 	the 	completion
of 	the 	construction which provides 	the
following 	information:
(i) 	A certification that 	the
individual 	wastewater 	system was
constructed and 	installed 	in
accordance 	with 	the 	approved plans
and 	specifications 	or 	that 	changes
made 	to 	the 	approved plans 	and
specifications 	are 	accepted by the
engineer; 	and
(ii) 	An 11 as-built 11 	plan of 	the
individual 	wastewater 	system; 	and
62-51
317t
§11-62-31.1
(2) 	The 	director may 	inspect 	the 	individual
wastewater 	system or 	its 	site 	at 	any time
before 	approving 	the 	system and may 	require
advance 	notice 	of 	the 	engineer's 	inspection.
(g) 	A graywater 	system 	shall 	be 	designed in
accordance with Chapter 	3-183.
(h) 	Each individual 	wastewater 	system shall 	be
an 	independent 	system and 	shall 	have 	all 	of 	its
plumbing, 	treatment 	(if 	any), 	and disposal 	components
separate 	from 	any other wastewater 	system.
(i) 	Wastewater 	into an 	individual 	wastewater
system 	from buildings 	other 	than dwellings 	shall 	meet
the 	pretreatment 	standards 	and 	local 	pollutant 	limits
as 	set 	by the 	respective 	county . 	If 	the 	county does
not 	have 	any local 	pollutant 	limits, 	the 	local 	limits
as 	set 	forth 	by 	the 	City and County of 	Honolulu 	shall
be 	used.
(j) 	Certification of 	a 	qualified cesspool . 	A
taxpayer 	seeking a 	cesspool 	upgrade, 	conversion, 	or
connection 	income 	tax credit 	must 	obtain 	a
certification by the director 	indicating: 	that 	t he
cesspool 	l ocation makes 	it 	eligible 	to 	be 	a 	qualified
cesspool ; 	that 	the 	cesspool 	upgrade 	has 	been completed
consistent 	with 	this 	rule and plans prepared by a
licensed engineer; 	and 	the 	total 	dollar 	amo unt 	the
taxpayer 	paid for 	the 	cesspool 	upgrade. 	The 	director
may issue 	such certification only where 	the 	direc t or
has 	received :
(1) 	A certification from a 	licensed 	contractor
or 	licensed engineer 	that 	the 	cesspool 	is 	loca t ed
within 	200 	feet 	of 	a 	shoreline, 	perennial 	s tream, 	or
wetland . 	Certifications 	are 	not 	required 	for
properties 	that 	are 	located 	in 	their entir et y 	within
200 	feet 	of 	a 	shoreline, 	perennial 	stream, 	or wetland.
The 	director 	shall 	certify as 	qualified all 	cesspools
that 	are 	located within a 	source water assessment 	area
(two year 	time 	of 	travel 	from 	a 	cesspool 	to a 	public
drinking water 	source);
(2) 	Design plans 	prepared by a 	licensed engineer
for 	a 	sewer 	connection or 	individual 	wastewater 	system
that 	complies 	with 	this 	chapter;
(3) 	Certification by a 	l icensed contractor of
closure 	and 	fi l ling of 	the 	cesspool 	and completion of
62-52
§11-62-31.2
an upgrade, 	either 	sewer 	connection or 	installation of
an 	individual 	wastewater 	system that 	complies with
this 	chapter; 	and
(4) 	A licensed engineer's 	final 	construction
inspection report 	with photos 	and as 	built 	plans 	and
certifying 	that 	the 	system was 	constructed in
accordance 	with design 	plans 	and 	this 	chapter. 	The
director 	will 	review 	submitted documentation and
provide 	certification 	to 	the 	taxpayer 	and 	the
Department 	of 	Taxation of 	any qualified cesspool.
(k) 	Certification of 	qualified expenses. 	The
director 	will 	determine 	all 	qualified expenses 	for 	the
tax credit. 	The 	taxpayer 	seeking a 	tax credit 	shall
submit 	to 	the 	director 	all 	receipts 	of payments 	made
to 	engineers 	and 	installers 	for 	the design, 	completed
installation and 	final 	construction 	inspection 	for 	the
cesspool 	upgrade 	along 	with the 	appropriate 	form as
directed by the 	Department 	of 	Taxation. 	The 	director
will 	notify the 	taxpayer and 	the Department 	of
Taxation 	of 	the 	amount 	of 	the 	tax credit 	allowed 	for
the 	tax year 	by noting 	the 	same 	on the 	form and
affixing 	the 	signature 	of 	the director or 	the
director's 	designee 	thereto.
(1) 	If 	the 	annual 	amount 	of 	the 	certified
credits 	reaches 	$5,000,000 	in 	the 	aggregate, 	the
director 	shall 	immediately discontinue 	certifying
credits 	for 	that 	year 	and 	notify the 	Department 	of
Taxation. 	Any taxpayer who 	is not 	eligible 	to 	claim
the 	credit 	in 	a 	ta~able 	year due 	to 	the 	$5,000,000 	cap
having been 	exceeded 	for 	that 	taxable year 	shall be
eligible 	to 	claim the 	credit 	in the 	subsequent 	taxable
year, 	except 	if 	the 	$5,000,000 	cap was 	exceeded 	in
2020 	and 	no 	additional 	credits 	are 	available. 	[Eff
8/30/91; 	am and comp 12/09/04; 	am and comp
MAR 21 2016 	] 	(Auth: 	HRS 	§§321-11, 	342D-4,
342D-5) 	(Imp: 	HRS 	§§321-11, 	322-1 	to 322-4, 	322-8,
342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-50)
§11-62-31.2 	Site 	evaluation. 	(a} 	The 	site
evaluation 	shall 	be 	performed by the 	engineer.
(b) 	The 	site 	shall 	be 	evaluated 	for 	depth of
permeable 	soil 	over 	seasonal 	high groundwater,
62-53
317 6
"317 6 	....u
§1 1 -62-31.2
bedrock, 	or 	other 	limiting 	layer, 	soil 	factors, 	land
slope, 	flooding 	hazard, 	and 	amount 	of 	suitable 	area
available.
(c) 	The minimum depth 	of 	the 	soil 	profile
observation 	shall 	be 	at 	least 	five 	feet. 	If 	the
engineer performs 	a 	preliminary observation at 	three
feet, 	the 	engineer 	shall 	confirm the 	soil 	profile 	to
five 	feet 	at 	the 	time 	of 	construction.
(d) 	The 	following 	factors 	shall 	be 	evaluated and
reported 	for 	a 	depth of 	at 	least 	three 	feet 	below the
proposed absorption 	system:
(1) 	Thickness 	of 	layers 	or 	horizons;
(2) 	Texture 	of 	soil 	layers;
(3) 	General 	color, 	and 	color variation
(mottling} ;
(4) 	Depth to 	water, 	if 	observed;
(S} 	Depth to 	estimated seasonal 	high groundwater
table;
(6) 	Depth to 	and 	type 	of 	bedrock, 	if 	observed;
and
(7) 	Other prominent 	features 	such 	as 	structure,
stoniness, 	and 	roots.
(e) 	Percolation tests.
(1) 	Soil 	percolation 	tests 	shall 	be 	conducted at
a 	minimum depth of 	three 	feet. 	If 	at 	the
time 	of 	construction, 	the 	soil 	profile 	at
five 	feet 	is 	different 	than 	at 	three 	feet,
another 	percolation 	test 	shall 	be 	performed
at 	the 	depth of 	the 	bottom of 	the 	absorption
system;
(2) 	Percolation 	tests 	shall 	follow 	the 	falling
head 	test 	procedure 	in Appendix 	C, 	entitled
Falling Head Test 	Procedure, 	dated July 	1,
2014, 	located at 	the 	end of 	this 	chapter;
and
(3} 	Additional percolation 	tests 	may be 	required
to 	identify the 	existence 	of 	a 	limiting
layer.	1
(f) 	The 	site 	evaluation 	information 	shall 	be
reported on 	forms 	developed by 	the 	director.
(g) 	If, 	during construction 	the 	actual 	site
conditions 	differ from 	the 	site 	conditions 	upon which
the 	wastewater 	system was 	approved, 	the 	design
62-54
§11-62-33.1
engineer 	shall 	revise 	the 	wastewater plans 	to 	reflect
the 	actual 	site 	conditions. 	The plans 	of 	the 	revised
wastewater system shall be 	submitted to 	the 	director
for 	approval 	pursuant 	to 	section 	11-62-31.1 {f} . 	[Eff
B/30/91, 	am and comp 	12/09/04; 	am and comp
MAR212016 	]{Auth: 	HRS 	§§321-11,
342D-4, 	342D-5} 	(Imp: 	HRS 	§§321-11, 	322-1 	to 	322-4,
322-8, 	342D-2, 	342D-4, 	342D-5, 	342D-50)
§11-62-32 	Spacing of 	individual 	wastewater
systems. 	No 	individual 	wastewater 	system shall 	be
located at 	any point 	having 	less 	than 	the minimum
distances 	indicated 	in Table 	II 	attached to 	this
chapter 	in Appendix D, 	entitled Tables, 	dated July 1,
2014, 	and located at 	the 	end of 	this 	chapter unless
otherwise 	approved by the 	director. 	The minimum
distances 	indicated 	in Table 	II 	shall 	be measured 	from
the 	outer edge 	of 	each 	item. 	[Eff 	12/10/88, 	am
8/30/91; 	am and comp 12/09/04; 	am and comp
UAR?. l 2p16 	] (Auth: 	HRS 	§§321-11,
342D-4, 	34~D-~f 	Imp: 	HRS 	§§321-11, 	322-1 	to 	322-4,
322-8, 	342D-2, 	342D-4, 	342D-S, 	342D-6, 	342D-50)
§11-62-33.1 	Specific 	requirements 	for 	new and
proposed treatment 	units. 	(a) 	Septic 	tank.
(1) 	All 	wastewater 	shall 	discharge 	into 	the
septic 	tank. 	Roof, 	footing, 	garage, 	surface
water drainage, 	cooling water, 	and 	graywater
disposed of 	in 	accordance 	with 	section 11-
62-31.l(g) (4) 	shall 	be 	excluded.
(2) 	Septic 	tanks 	shall 	meet 	the 	International
Association 	of 	Plumbing 	and Mechanical
Officials 	(IAPMO) 	material 	and 	property
standards 	for 	prefabricated 	septic 	tanks,
IAPMO ANSI 	Zl000-2013. 	Septic 	tanks 	shall
be 	approved and 	listed by IAPMO.
(3) 	Plans 	for 	cast-in-place 	septic 	tanks 	shall 	be
submitted with 	the 	application for 	the
individual 	wastewater 	system. 	The 	plans 	for
the 	septic 	tank 	shall 	be 	designed and
stamped by a 	licensed 	structural 	engineer
62-55
1317 6
§11-62-33.1
and shall 	meet 	the 	IAPMO design
specifications .
(4) 	The 	following 	schedule 	shall 	apply 	to 	septic
tank sizing:
No. 	of 	Bedrooms 	Minimum Capacity
(Gallons)
4 	or less 	1000
5 	1250
(5) 	For wastewater 	flows 	greater 	than 	1,000
gallons 	per day or 	five 	bedrooms, 	the
formula: 	Minimum capacity gallons=
1,000 	+ 	(Q-B00)x 1.25, 	where 	Q=design 	flow,
shall 	be 	used.
(6) 	Concrete 	septic 	tanks 	shall 	be coated
to protect 	the 	tank from 	leakage 	and
corrosion by acceptable means. 	The 	coating
shall 	cover 	the 	entire 	tank 	interior.
(7) 	Manholes 	or removable covers 	to 	septic 	tanks
shall 	be 	brought 	to grade . 	The 	cover 	shall
be 	secured to 	prevent 	unauthorized 	entry or
opening 	of 	the 	tank .
(8) 	When 	septic 	tanks 	are 	installed 	in ground
water 	or 	in 	clay soils 	with an expansive
nature, 	the 	engineer 	shall 	design or provide
adequate 	protection to 	prevent 	the 	tank 	from
floating, 	moving , 	or crushing.
(9) 	The 	excavation 	to 	receive 	the 	tank 	shall 	be
large 	enough to 	permit 	the 	proper placement
of 	the 	tank 	and backfill. 	Tanks 	shall 	be
installed on 	a 	solid base 	that 	will 	not
settle 	and 	shall 	be 	level. 	Where 	rock or
other undesirable 	protruding 	obstructions
are 	encountered, 	the 	bottom of 	the 	hole
shall 	be 	excavated an additional 	six 	inches
and 	backfilled with sand, 	crushed stone, 	or
gravel 	to 	the 	proper grade. 	Backfill 	around
and over 	the 	septic 	tank 	shall 	be placed 	in
such a 	manner 	as 	to prevent 	undue 	strain or
damage 	to 	the 	tank or 	connected pipes .
(10) 	When a 	septic 	tank is 	installed under 	a
driveway, 	parking 	lot, 	in 	a 	heavy saturated
62-56
§11-62-33 . 1
soil, 	or other 	areas 	subject 	to heavy 	loads,
the 	tank shall 	be 	capable 	of 	withstanding an
H-20 	wheel 	load as 	defined by the American
Association of 	State Highway Officials.
(11) 	Effluent 	from a 	septic 	tank 	shall 	be
discharged into a 	soil 	absorption 	system,
sand 	filter, 	subsurface 	irrigation 	system as
approved by the 	director, 	or 	other 	treatment
unit 	approved 	for 	use 	by the 	director.
(b) 	Household aerobic 	units.
(1) 	All 	wastewater 	shall 	discharge 	into the
household aerobic 	unit. 	Roof, 	footing,
garage, 	surface water drainage, 	and 	cooling
water 	shall be 	excluded.
(2} 	Household aerobic 	units 	shall 	be 	approved by
the director based upon 	the 	"Standard No.
40" 	for 	Class 	I 	units 	as 	set 	forth 	by 	the
National 	Sanitation Foundation. 	The
performance 	data 	shall 	have 	been 	obtained by
an 	agency such as 	a 	university 	or 	an
independent 	research 	laboratory acceptable
to 	the 	director or 	from 	the 	National
Sanitation Foundation 	(NSF) 	Testing
Laboratory, 	Ann Arbor, 	Michigan.
(3} 	Owners 	of 	proposed and existing 	household
aerobic units 	shall 	have 	an 	active 	service
contract 	for 	the 	proper maintenance 	of 	the
aerobic unit 	and 	its 	disposal 	system with a
certified operator or 	factory 	certified
representative, 	and 	a 	copy 	of 	an 	active
service 	contract 	shall be 	submitted annually
to 	the department. 	The 	contract 	shall 	also
include pumping 	service 	t o 	maintain the
household aerobic 	unit. 	For 	proposed
household aerobic 	units, 	a 	copy of 	an
executed 	service 	contract 	shall 	be 	submitted
prior 	to 	the 	final 	approval 	of 	the
individual 	wastewater 	system.
(4) 	As 	a 	minimum, 	the 	aerobic 	treatment 	unit
service 	contract 	shall 	include 	the 	term of
contract 	period 	(start 	and end dates) 	and
the 	following 	requirements:
62-57
3176
§11-62-33 . 1
(A) 	Inspect 	all 	aerobic 	treatment 	unit
equipment 	to ensure 	its proper
operation at 	least 	every 	six 	(6)
months ;
(B) 	Provide 	regular maintenance 	of
equipment 	as 	required by 	the
manufacturer;
(C) 	Verify the 	aerobic 	treatment 	unit 	is
providing adequate 	mixing 	and 	aeration
of 	the microbes;
(D) 	Measure 	the 	depth or volume 	of 	sludge
in 	the 	aerobic 	treatment 	unit 	every six
months, 	and assess 	whether 	sludge
removal 	by pumping 	is 	necessary.
Provide 	sludge pumping, 	as 	needed . 	If
pumping 	is 	necessary, 	record 	the 	depth
of 	sludge 	or percentage 	of 	sludge
volume 	in the ATU prior 	to 	pumping; 	and
(E) 	Maintain a 	log of 	all 	service 	provided.
(5) 	Effluent 	from an aerobic unit 	shall 	be
discharged 	into a 	soil 	absorption 	system,
sand 	filter, 	subsurface 	irrigation 	system as
approved 	by 	the 	director, 	or other 	treatment
unit 	or disposal 	system approved 	for 	use 	by
the 	director.
(6) 	In areas 	below 	(makai 	of) 	the Underground
Injection 	Control 	Line 	established pursuant
to 	chapter 	11-23, 	where 	the vertical
separation distance 	from 	the 	discharge 	to
the 	seasonal 	high groundwater 	table 	is 	less
than 	three 	feet, 	a 	new household 	aerobic
unit 	may discharge 	its 	effluent 	into 	an
elevated mound to 	achieve 	the 	vertical
separation 	or drip 	irrigation system or,
with a 	variance 	approved by the 	director and
if 	the 	effluent 	is 	disinfected, 	to 	a 	seepage
pit . 	Where water 	bearing 	formations 	are 	in
danger of 	contamination, 	the 	director may
require 	greater vertical 	separation.
(c) 	Subsurface 	and 	recirculating 	sand filters
shall 	be 	reviewed on 	a 	case-by-case basis by
the 	director. 	[Eff 	8/30/91; 	am and 	comp
62-58
§11-62-34
12/09/04; 	am and comp 	MAR 2 I 201'1 	J
(Auth: 	HRS 	§§321-11, 	342D-4, 	342D-5) 	(Imp:
HRS 	§§321-11, 	322-1 	to 	322-4, 	322-8, 	342D-2,
342D-4, 	342D-5, 	342D-50)
§11-62-34 	Specific 	requirements 	for 	new and
proposed disposal 	systems. 	(a) 	Absorption trenches.
(1) 	Location.
(A) 	Absorption trenches 	shall 	be 	located 	in
accordance with 	section 	11-62-32.
(B) 	Absorption trenches 	shall 	not 	be
constructed 	in 	soils 	with a
percolation 	rate 	slower 	than 	sixty
minutes 	per 	inch 	or 	where 	rapid
percolation may 	result 	in contamination
of 	water-bearing 	formations 	or 	surface
waters.
(C) 	Absorption 	trenches 	shall 	be 	located on
the 	property 	to maximize 	the 	vertical
separation distance 	from 	the 	bottom of
the 	absorption 	trench 	to 	the 	seasonal
high groundwater 	level, 	bedrock, 	or
other 	limiting 	layer, 	but 	under no
circumstance 	shall 	the 	vertical
separation be 	less 	than 	three 	feet.
The 	director may 	require 	a 	greater
vertical 	separation where water-bearing
formations 	are 	in danger 	of
contamination.
{D) 	Absorption trenches 	shall 	not 	be
constructed 	in unstabilized 	fill.
(2) 	Design .
(A) 	The 	minimum absorption area 	for 	any
absorption trench 	system 	shall 	be based
upon 	a 	flow of 	200 	gallons 	per bedroom
per 	day and in accordance 	with Table
III 	located in Appendix D, 	entitled
Tables, 	dated July 1, 	2014, 	and 	located
at 	the 	end of 	this 	chapter.
(B) 	The 	absorption area 	shall 	be 	computed
using 	the 	bottom area of 	the 	absorption
trench.
62-59
317 6
13176 	11
§11-62-34
(C) 	Each 	absorption 	trench 	system 	shall
have 	a 	minimum of 	two 	trenches .
(D) 	Each 	distribution 	line 	shall 	be 	equal
in 	length.
(E) 	The 	maximum length of 	any 	one 	trench
shall 	be 	one hundred 	feet.
{F) 	Absorption 	trenches 	shall 	be 	at 	least
eighteen 	inches 	wide 	but 	no 	more 	than
thirty-six 	inches wide.
(G) 	The bottom of 	absorption 	trenches 	shall
be 	at 	least 	eighteen 	inches 	below 	the
finished grade.
(H) 	Gravity fed 	absorption 	lines 	and
trenches 	shall 	have 	a 	slope 	at 	the 	rate
of 	two 	to 	four 	inches 	per hundred 	feet .
(I) 	Absorption 	trenches 	shall 	not 	be
installed on land with a 	slope 	gradient
greater than twelve per cent.
(J) 	On rolling 	or 	sloping 	land, 	each
absorption 	trench 	shall 	approximate 	the
land 	surface 	contour .
(K) 	A distribution box or header 	shall 	be
installed between the 	treatment 	unit
and 	the 	absorption trenches .
(L) 	Each distr i bution line 	shall 	connect
individua l ly to 	the 	distribution box.
(M) 	If 	a 	header 	is 	used, 	there 	shall 	be 	an
equal 	number of 	distribution 	lines 	on
each 	side 	of 	the 	influent 	j unction . 	An
inspection port 	shall 	be provided on
the 	header 	and 	shall 	be brought 	to
grade 	and 	fitted 	with a 	screw type 	cap
or 	cover .
(N) 	If 	a 	distribution box 	is 	used, 	a
permanent 	inspect i on port 	with 	a
minimum 	interior 	diameter of 	six 	inches
shall 	be 	secured to 	the 	box 	cover,
brought 	to 	the 	finished grade , 	and
fitted 	with a 	screw type 	cap 	or cover.
(3) 	Materials.
(A) 	The 	engineer s hall 	be 	responsible 	for
the 	choice 	of 	materials 	used 	in 	the
soil 	absorpti o n 	system .
62-60
§11-62-34
(B) 	Pipe 	used for 	distribution 	lines 	shall
meet 	the 	appropriate ASTM standard or
those 	of 	an equivalent 	testing
laboratory . 	Fittings used in the
absorption 	system shall be 	compatible
with the 	materials used in 	the
distribution 	lines.
(C) 	Gravel 	or crushed 	stone 	shall 	be washed
and 	shall 	range 	in 	size 	from 	three-
fourths 	to two 	and one-half 	inches.
(D) 	The 	material 	used 	to cover the 	top of
the 	stone 	shall be 	a 	filter 	fabric
material 	or 	equal.
(4) 	Construction.
(A} 	A distribution box or header 	shall 	be
set 	level 	and arranged so that 	effluent
is 	evenly distributed to 	each
distribution 	line. 	Adequate provisions
shall 	be 	taken 	to 	assure 	stability and
provide 	access 	for 	inspection of 	the
distribution 	lines.
(B} 	The pipe 	connecting the distribution
box to 	the 	distribution 	line 	shall 	be
of 	a 	tight 	joint 	construction 	laid on
undisturbed earth or properly bedded
throughout 	its 	length .
(C} 	If 	a 	header 	is 	used, 	it 	should be made
of 	water-tight 	construction.
(D} 	When the 	trenches 	have 	been excavated,
the 	sides 	and bottom shall 	be 	raked 	to
scarify any 	smeared soil 	surfaces.
Construction equipment 	and other
materials 	not 	needed 	to 	construct 	the
system should be 	kept 	off 	the 	area 	to
be used 	for 	the 	absorption 	system 	to
prevent 	undesirable 	compaction 	of 	the
soils . 	Construction 	shall 	not 	be
initiated when 	the 	soil 	moisture 	is
high.
(E) 	At 	least 	six 	inches 	of 	gravel 	or
crushed 	stone 	shall 	be placed 	in 	the
bottom of 	the 	trench.
62-61
3176
B176
§11-62-34
(F) 	The 	distribution line 	shall 	be
carefully placed on 	the 	bedding 	at 	a
uniform 	slope 	and covered with 	at 	least
two 	inches 	of 	gravel 	or 	stone.
{G) 	The 	ends 	of 	the 	distribution 	lines
shall 	be 	capped or plugged.
{b) 	Deep 	absorption 	trenches. 	Deep 	absorption
trenches 	may be 	considered where 	the 	depth of 	suitable
soil 	is 	insufficient 	to permit 	the 	installation 	of 	a
conventional 	trench 	system due 	to 	the 	presence 	of 	a
limiting 	layer more 	than two 	feet 	in 	depth which
overlies 	suitable 	soils 	of 	sufficient 	thickness .
Requirements 	for 	location, 	design , 	slope, 	material,
construction , 	and dosing 	system design 	contained 	in
subsection 	{a) 	shall 	apply 	to 	deep 	absorption 	trenches
except 	for 	depth of 	construction. 	In 	addition, 	the
following 	design 	considerations 	shall 	apply:
(1) 	The 	site 	evaluation procedure 	shall 	include
soil 	profile observations 	of 	at 	least 	three
soil 	observation pits 	constructed to 	a
minimum depth of 	three 	feet 	below the
proposed trench bottom. 	Monitoring 	to
establish depth 	to 	seasonal 	soil 	saturation
or high groundwater may be 	considered i
{2) 	Deep 	absorption 	trenches 	shall 	be
constructed at 	least 	one 	foot 	into 	the
suitable 	soil ; 	and
(3) 	The 	distribution piping 	in deep 	absorption
trenches 	shall 	be 	installed with 	the 	invert
of 	the 	piping at 	a 	depth of not 	more 	than
thirty 	inches . 	Gravel 	or crushed 	stone
shall 	be 	placed 	from 	the 	bottom of 	the
trench excavation 	to 	a 	point 	two 	inches
above 	the 	top of 	the distribution piping .
(c) 	Absorption beds .
{l) 	Location.
{A) 	Absorption beds 	shall 	be 	located 	in
accordance 	with 	section 	11-62-32 .
(B) 	Absorption beds 	shall 	not 	be
constructed 	in 	soils 	with a 	percolation
rate 	slower 	than 	sixty minutes 	per 	inch
or where 	rapid percolation may 	re s ult
62-62
§11-62-34
in 	contamination of water-bearing
formations 	or 	surface waters.
(C) 	Absorption beds 	shall 	be 	located on the
property to maximize 	the 	vertical
separation distance 	from 	the 	bottom of
the 	absorption bed to 	the 	seasonal 	high
groundwater 	level, 	bedrock, 	or other
Limiting 	layer, 	but under no
circumstance 	shall 	the 	vertical
separation be 	less 	than 	three 	feet.
The 	director may 	require 	a 	greater
vertical 	separation where 	water-bearing
formations 	are 	in danger of
contamination.
(D) 	Absorption beds 	shall 	not 	be
constructed 	in unstabilized 	fill.
(2) 	Design.
(A} 	The minimum area 	for 	any absorption bed
system 	shall be 	based upon a 	flow of
200 	gallons per bedroom per day 	and 	in
accordance with Appendix D, 	Table 	III
dated July 1, 	2014 	and 	located at 	the
end of 	this 	chapter.
(B) 	The 	absorption area 	shall 	be 	computed
using 	the 	bottom area 	of 	the 	absorption
bed.
(C) 	Each 	soil 	absorption bed 	system 	shall
have 	a 	minimum of 	two 	distribution
lines.
(D) 	If more 	than one 	absorption bed 	is
designed, 	each absorption bed shall 	be
equal 	in area.
(E) 	The 	maximum 	length of 	any distribution
line 	shall 	be 	one hundred 	feet.
(F) 	Distribution 	lines within 	an absorption
bed 	shall 	be uniformly 	spaced no 	more
than 	six nor 	less 	than 	four 	feet 	apart .
(G) 	Distribution 	lines 	within an absorption
bed 	shall 	be placed 	no 	more 	than 	three
feet 	nor 	less 	than 	eighteen 	inches 	from
the 	sidewall 	of 	the 	bed.
62-63
3176
§11-62-34
(H) 	The 	bottom of 	absorptio n 	beds 	sha ll 	be
at 	least 	eighteen 	inc he s 	below the
finished g r ade.
(I) 	Absorption beds 	shall 	not 	be 	installed
on 	land with a 	slope 	gradient 	greater
than eight per 	cent.
( J) 	A distribution box or header 	shall 	be
ins t al l ed between 	the 	treatment 	unit
and 	the 	absorption bed.
( K) 	Each distribution 	line 	shall 	connect
individually to 	the 	distribution box .
(L) 	If 	a 	header 	is 	used, 	there 	shall 	be 	an
equal 	number of 	d i stribution 	lines 	on
each 	side 	of 	the 	influent 	junction. 	An
inspection port 	shall 	be provided on
t he 	header 	and 	shall 	be brought 	to
grade 	and 	fitted 	with a 	screw type 	cap.
(M) 	If 	a 	distribution box 	is 	used, 	a
permanent 	inspection port 	with a
minimum 	interior diameter of 	six 	inche s
shall 	be 	secured to 	the box 	cover,
brought 	to 	the 	finished grade, 	and
fitted with a 	screw type 	cap or cover.
(3) 	Materials.
(A) 	The 	eng i neer 	shall be 	responsible 	for
the 	choice 	of 	materials used in the
soil 	absorption 	system.
(B) 	Pipe 	used 	for 	distribution lines 	shal l
meet 	the 	appropriate ASTM standard o r
those 	of 	an 	equivalent 	testing
laboratory . 	Fittings used in 	the
absorption 	system shall 	be 	compatible
with the 	materials 	used in the
distribution lines .
(C) 	Gravel 	or 	crushed 	stone 	shall 	be 	washed
and shall 	range 	in 	size from 	three-
fourths 	to 	two 	and one-half 	inches.
(D) 	The material 	used 	to cover the 	top of
the 	stone 	shall 	be a 	filter 	fabric
material 	or 	equal.
(4) 	Construction.
(A) 	The 	floor 	of 	the 	absorption bed shall
be 	level.
62-64
§11-62-34
(B) 	A distribution box or header 	shall 	be
set 	level 	and arranged so 	that 	effluent
is 	evenly distributed to 	each
distribution line. 	Adequate provisions
shall 	be 	taken 	to ensure 	stability and
provide 	access 	for 	inspection of 	the
distribution 	lines.
(C) 	The pipe 	connecting 	the 	distribution
box to 	the 	distribution line 	shall 	be
of a 	tight 	joint 	construction 	laid on
undisturbed earth or properly bedded
throughout 	its 	length.
(D) 	If 	a 	header 	is 	used, 	it 	should be made
of watertight 	construction.
(E) 	When the 	beds 	have been excavated, 	the
sides 	and bottom 	shall 	be 	raked 	to
scarify any 	smeared 	soil 	surfaces.
Construction equipment 	and other
materials 	not 	needed 	to construct 	the
system should be kept 	off 	the 	area 	to
be used 	for 	the 	absorption 	system to
prevent undesirable 	compaction of 	the
soils. 	Construction 	shall 	not 	be
initiated when the 	soil 	moisture 	is
high.
(F) 	At 	least 	six 	inches 	of 	gravel 	or
crushed 	stone 	shall 	be placed in 	the
bottom of 	the 	bed.
(G) 	The 	distribution 	line 	shall 	be
carefully placed on 	the 	bedding with no
slope 	and 	covered with at 	least 	two
inches 	of 	gravel 	or 	stone .
(H) 	The 	ends 	of 	the 	distribution 	lines
shall 	be 	capped or plugged.
(d) 	Seepage pits.
(1) 	Location.
(A) 	Seepage pits 	shall 	be 	located 	in
accordance with 	section 11-62-32 .
(B) 	Seepage 	pits 	shall 	not 	be 	constructed
in 	soils having a 	percolation 	rate
slower 	than 	ten minutes 	per 	inch
(weighted average) 	or where 	rapid
percolation through 	such soils 	may
62-65
J176
§11-62-34
result 	in 	contaminat i on of water-
bearing 	formations 	or 	surface 	water.
(C) 	The 	seepage pit 	shall 	be 	located on 	the
lot 	to maximize 	the 	vertical 	separation
distance 	from 	the 	bottom of 	the 	seepage
pit 	to 	the 	seasonal 	high groundwater
table, 	bedrock , 	or 	other 	limiting
layer . 	The vertical 	separation shall
not 	be 	less 	than 	three 	feet 	unless
otherwise 	approved 	by the 	director
and 	the 	requirements 	of 	section 11-62-
33.l(b) (5) 	are met . 	Where 	water-
bearing 	formations 	are 	in danger of
contamination, 	greater vertical
separation may be 	required.
(2) 	Design.
(A) 	Seepage 	pits 	shall 	be 	used only when
one of 	the 	following 	are 	met:
(i) 	Slope 	of 	the 	finished 	elevation
o f 	the 	lot 	is 	greater 	than
twelve 	per 	cent 	and 	the 	use 	of
absorption beds 	or 	trenches 	is
not 	feasible.
( ii ) 	The presence 	of 	a 	limiting 	layer
more 	than 	seven 	feet 	in depth
which overlies 	suitable 	soils 	of
sufficient 	thickness.
(iii } 	Insufficient 	land 	area 	exists 	to
ins ta ll 	absorption trenches 	or
beds .
(B) 	The mi ni mum area 	in 	any seepage 	pit
sha l l 	be based upon 	a 	flow of 	200
gallons 	per bedroom per 	day 	and 	in
accordance with Appendix D, 	Table 	III
dat e d 	July 1, 	2014 	and 	located at 	the
end of 	this 	chapter.
{C) 	The 	surface 	dimension 	is measured 	as
the mean distance 	of 	the 	clear 	opening
below the 	inlet pipe.
(D) 	The 	minimum surface 	dimension 	is 	six
feet .
(E) 	The 	effec t ive depth of 	the 	seepage pit
shall 	be measured fro m the bottom of
62-66
§11-62-34
the 	inlet 	pipe 	to 	the 	bottom of 	the
pit, 	with the 	thickness 	of 	strata of
soils 	having percolation rates 	slower
than 	thirty minutes 	per 	inch deducted.
(F) 	The minimum 	effective 	depth 	is 	ten 	feet
and 	shall be 	greater 	than 	its widest
surface 	dimension.
(G) 	The 	effective 	area 	of 	the 	seepage pit
shall 	be 	the vertical 	wall 	area of 	the
areas 	corresponding to 	the 	effective
depth of 	the 	pit 	excavation. 	No
allowance 	shall 	be made 	for 	the 	bottom
area.
(H) 	When more 	than one 	seepage pit 	is 	used,
a 	distribution box 	shall 	be 	installed
between the 	treatment 	unit 	and all
seepage pits. 	Each 	seepage pit 	shall
individually connect 	to 	the
distribution box.
(I) 	When more 	than one 	seepage pit 	is 	used,
each pit 	shall 	have 	an 	equal 	effective
area.
(J) 	If 	a 	distribution box 	is 	used, 	a
permanent 	inspection port 	with a
minimum 	interior diameter 	of 	six 	inches
shall 	be 	secured to 	the box cover,
brought 	to 	the 	finished 	grade, 	and
fitted 	with a 	screw type 	cap 	or 	cover.
{3) 	Construction.
(A) 	Seepage 	pits 	shall 	include 	a 	sidewall
lining 	constructed of 	durable 	material
that 	will 	permit 	free 	passage 	of
wastewater without 	excessive 	plugging
while 	still 	excluding 	the 	entry of
surrounding 	soil.
(B) 	Seepage pits 	shall 	include 	a 	cover
which extends 	at 	least 	twelve 	inches
beyond 	the 	seepage 	pit 	excavation ,
unless 	a 	concrete 	ring 	is 	used.
(C) 	The 	lining 	and 	cover 	of 	any 	seepage 	pit
shall 	be 	capable 	of 	supporting 	the
normal 	loads 	imposed. 	The 	engineer
62-67
3176
§11-62-34
317 6 	I f jj
shall 	submit written 	justification 	for
the deletion of 	any 	sidewall 	lining.
(D) 	The distance between the 	outer 	diameter
of 	the 	lining 	and 	the 	excavation
diameter 	shall 	be 	at 	least 	six inches,
but 	not 	more 	than 	twelve 	inches. 	The
space 	between lining 	and 	the 	excavation
diameter 	shall 	be 	filled 	with washed
gravel 	or crushed 	stone 	ranging 	in 	size
from 	three-fourths 	to 	two 	and one-half
inches. 	The placement 	of 	the 	gravel 	or
stone 	shall 	fill 	the 	annular 	space
between the 	pit 	lining 	and excavation
diameter. 	Gravel 	and 	stone 	shall 	not
be placed within 	the 	seepage pit
itself.
(E) 	The watertight 	cover 	shall 	be provided
and at 	least 	one watertight 	manhole
either 	round or 	square, 	tapered 	to 	a
minimum of 	twelve 	inches 	in dimension
shall 	be provided 	in the 	cover 	for
inspection or for 	e mptying the 	contents
when 	required.
(F) 	The 	top of 	the 	seepage pit 	shall 	be
within 	twelve 	inches 	of 	the 	final
grade.
(G) 	If 	the 	cover 	of 	the 	seepage 	pit 	does
not 	extend to 	the 	finished 	grade, 	a
permanent 	inspection port with a
mi n imum diameter of 	twelve 	inches
expanding through and secured 	to 	the
cover 	shall 	be brought 	to 	the 	finished
grade 	and 	fitted with a 	screw type 	cap
or 	cover.
(H) 	The 	distribution box 	shall 	be 	set 	level
so 	that 	the 	effluent 	is 	evenly
distributed 	to each 	seepage pit.
(I) 	The 	distribution box 	shall 	connect 	to
each seepage pit 	with pipe of
wa t ertight 	construct i on 	at 	least 	six
i nches 	in diameter, 	and 	sloped at 	least
one - eighth inch per 	foot.
62-68
§11-62-34
{J) 	The material 	used 	to 	cover 	the 	top 	of
the 	stone 	or gravel 	surrounding 	the
lining 	shall 	be 	a 	filter 	fabric
material 	or equal.
(e) 	Elevated mound 	system. 	Elevated mound
systems 	shall 	be 	reviewed on a 	case-by-case 	basis.
(f) 	Other disposal 	systems.
(1) 	Soil 	replacement 	system.
(A) 	Soil 	replacement 	systems 	shall 	be used
for 	sites 	with the 	following 	soils
layers 	in 	the 	upper 	soil 	horizons:
(i) 	Soils 	with percolation rates
less 	than 	one 	minute 	per 	inch;
(ii) 	Soils 	with percolation 	rates
greater 	than 	sixty minutes 	per
inch 	that 	occur 	within 	the 	upper
five 	feet 	of 	the 	soil 	and
underlain by more 	permeable
soils. 	Installation guidelines
shall 	comply with the
requirements 	of very high
permeability 	soils 	of
subparagraph 	(B); 	or
{iii) 	Fractured 	lava.
(B) 	Trenches 	may be 	excavated up 	to 	thirty-
six 	inches 	in width to 	depths 	not 	to
exceed 	five 	feet 	below grade 	nor 	closer
than 	three 	feet 	to 	seasonal 	high
groundwater 	level, 	provided any
groundwater mounding 	induced by
wastewater does 	not 	rise 	closer 	than
one 	foot 	from 	the 	bottom of 	the
excavation 	and bedrock 	is 	at 	least
three 	feet 	below 	the 	bottom of 	the
excavation.
(C) 	Soil 	replacement 	absorption trenches
and beds 	shall 	follow 	the 	applicable
provisions 	of 	subsections 	{a), 	(b) 1 	and
( C) .
(2) 	Evapotranspiration 	systems 	shall 	be 	reviewed
on 	a 	case-by-case 	basis 	by the 	director.
The 	director 	shall 	use 	the 	provisions 	of
section 	7.3.2 	of 	the 	October 	1980 	edition of
62-69
3176
3 1 7 6 	., .J
§11-62-34
the 	EPA Design Manual 	on Onsite 	Wastewater
Treatment 	and Disposal 	Systems 	as 	a 	guide
for 	the 	review 	of 	evapotranspiration
systems.
(3) 	Gravelless 	systems.
{A) 	Gravelless 	soil 	absorption 	systems 	may
be used 	as 	an alternative 	to 	soil
absorption 	systems 	as 	specified in
subsections 	(a) 	and 	{b), 	except 	for
sections 	11-62-34 (a) (3) (C), 	11-62-
3 4 {a) ( 3 ) ( D) , 	11- 6 2 - 3 4 {a) ( 4) ( E) , 	and 11-
62 - 34 (a) (4) (F) , 	11-62-34 (c) (2) (F), 	11-
62-34 (c) (2) (G), 	11-62-34 (c) (3) (C), 	11-
6 2 - 3 4 { c ) { 3 ) { D ) , 	and 	11 - 6 2 - 3 4 ( c ) ( 4 ) ( F ) .
(B) 	Design 	criteria, 	material
specifications, 	and other pertinent
data 	shall 	be 	submitted 	to 	the
director .
(C) 	The 	total 	area of 	the 	soil 	absorption
system 	for 	the 	gravelless 	system shall
be 	the 	same 	as 	specified 	in 	subsections
(a), 	(b), 	and 	(c), 	except 	for 	chambered
system where 	the 	director may approve
of 	a 	reduction 	factor 	as 	deemed
appropriate.
(D) 	If 	chambered 	systems 	are 	used, 	the
chamber units 	shall 	be 	placed up
against 	the 	sidewall 	of 	the 	excavation .
In absorption beds, 	the 	adjacent
chambers 	shall 	abut 	one 	another.
(E) 	The 	use 	of 	filter 	fabric, 	unless
specified by the director, 	shall 	follow
the 	manufacturer's 	recommendation.
[Eff 	8/30/91; 	am and 	comp 	12/09/04; 	am
and 	comp 	MAR 2 I 2016 	] 	(Auth: 	HRS
§§321-11, 	342D-4, 	342D-5) 	{Imp: 	HRS
§§321-11, 	322-1 	to 	322-4, 	322-8,
342D-2, 	342D-4, 	342D-5, 	342D-50)
§11-62-35 	Other 	individual 	wastewater 	systems.
(a) 	The 	specific design 	requirements 	for 	composting
toilets, 	incinerator toilets, 	natural 	systems, 	and
62-70
§11-62-36
other 	individual 	wastewater 	systems not 	specifically
covered 	in this 	chapter 	shall 	be 	reviewed 	and approved
by 	the 	director on 	a 	case-by-case 	basis. 	Solids
generated 	from 	such products 	that 	are 	land 	applied
must 	meet 	the 	requirements 	of 	subchapter 	4. 	Such
products, 	if 	sold 	in Hawaii, 	shall 	be 	approved by the
director based on appropriate 	testing procedures 	and
standards 	as 	set 	forth by the National 	Sanitation
Foundation 	(NSF) 	Testing Laboratory, 	Ann Arbor,
Michigan. 	The performance 	data 	shall 	be 	obtained by
an agency 	such as 	a 	university or 	an 	independent
research 	laboratory acceptable 	to 	the 	director or 	from
the 	NSF.
(b) 	The director may approve 	an 	innovative
wastewater 	system based on the 	following 	conditions:
(1} 	The 	innovative 	system provides 	or may
provide 	a 	benefit 	to 	the 	people 	of 	the
State;
(2} 	The 	owner of 	the 	innovative 	system 	shall
agree 	that 	for 	a 	period of 	up 	to 	twelve
months 	after 	the 	initiation 	of 	the 	operation
of 	the 	innovative 	system, 	operational 	data
shall 	be 	gathered 	and 	submitted 	to 	the
director; 	and
(3} 	The 	owner 	shall 	submit 	a 	written agreement
stating 	that 	should 	the 	director 	at 	any time
find 	the 	operation of 	the 	innovative 	system
unsatisfactory, 	the 	owner 	shall 	promptly
repair 	or modify 	the 	system, 	or 	replace 	it
with another 	acceptable 	system. 	[Eff
8/30/91; 	am 	and 	comp 	12/09/04; 	am and comp
MAR 21 2016 	] 	(Auth: 	HRS 	§§321 -
11, 	342D-4, 	342D-5) 	(Imp: 	HRS 	§§321-11,
322-1 	to 	322-4, 	322-8, 	342D-2, 	342D-4, 	342D-
S, 	342D-6, 	342D-50}
§11-62-36 	Cesspools. 	(a) 	No 	new cesspools
shall 	be 	constructed 	after 	the 	effective 	date 	of 	this
rule 	unless 	they have 	been 	approved for 	construction
before 	the 	effective 	date 	of 	this 	rule.
62-71
317 6
§11-62-36
(b) 	The 	director may 	require 	a 	cesspool 	card 	from
an owner whose 	cesspool 	has 	no 	cesspool 	card 	on 	file
with 	the department. 	An 	existing 	cesspool 	card 	shall
be 	completed and 	signed by a 	licensed 	engineer,
contractor, 	plumber, 	or architect. 	[Eff 	and 	comp
12/09/04; 	am and 	comp 	MAR 21 2016 	] 	(Auth : 	HRS
§§321-11, 	342D-4, 	342D-5, 	342E-3) (Imp: 	HRS 	§§321-11,
322-1 	to 	322-4, 	322-8 , 	3420 * 2, 	342D-4, 	342D-5, 	342D-6,
342D-50, 	342E-3)
§11-62-37 	Application 	for 	and 	review of 	building
ermits 	and 	individual 	wastewater s 	stems. 	(a) 	The
irector s 	al 	review all 	ind ividual 	wastewater
systems 	before 	the 	director 	signs 	any 	related 	county
building permit 	application.
{b) 	The 	applica t ion 	to 	construct 	a 	new
individual 	wastewater 	system or 	to modify 	an 	existing
individual 	wastewater 	system 	shall 	be 	made 	by 	the
applicant 	on 	forms 	furnished by the 	director. 	The
application at 	a 	minimum 	shall 	contain 	the 	following
information:
(1) 	Name 	of 	the 	owner 	of 	the 	individual
wastewater system;
(2) 	The 	location of 	the 	individual 	wastewater
system, 	including a 	location map, 	plot 	plan,
street 	address, 	and 	tax map key number;
(3) 	The 	type 	and size 	of 	treatment 	unit 	and
disposal 	system;
(4) 	Certification by the 	engineer 	that 	the
individual 	wastewater 	system has 	been
designed in accordance 	with 	sections 	11-62-
31.1 	through 11-62-41; 	and
(5) 	Certification by the 	engineer 	that 	a 	final
inspection report 	will 	be 	submitted to 	the
director 	in accordance 	with 	section 11-62-
31.l(f) (1) (B) .
(c) 	Every applicant 	for 	an 	individual 	wastewater
system shall 	pay a 	filing 	fee 	in 	accordance with 	the
schedule 	of 	this 	subsection . 	The 	filing 	fee 	shall 	be
submitted with the 	individual 	wastewater 	system
application and 	shall 	not 	be 	refunded nor 	applied 	to
any subsequent 	individual 	wastewater 	system
62-72
§11-62-41
application. 	Fees 	shall 	be made 	payable 	to 	the 	State
of Hawaii.
(1) 	New individual 	wastewater 	system, 	new
treatment 	unit 	or new disposal 	system 	-
$100; 	and
(2} 	Addition or modification 	to 	an approved or
existing 	individual wastewater 	system or
part 	thereof 	- 	$25. 	[Eff 	and comp 	12/09/04;
am and comp 	MAR 2 1 2016 	] 	(Auth: 	HRS
§§321-11, 	342D-4, 	342D-5) 	(Imp: 	HRS
§§321-11, 	322-1 	to 322-4, 	322-8, 	342D-2,
342D-4, 	342D-5, 	342D-6, 	342D-13, 	342D-50}
§§11-62-38 	to 	11-62-39 	(Reserved)
SUBCHAPTER 4
WASTEWATER SLUDGE USE AND 	DISPOSAL
§11-62-41 	General 	requirements 	and prohibition .
(a) 	No person 	shall 	generate, 	treat, 	prepare, 	store,
haul, 	apply, 	place, 	use, 	or dispose 	of 	wastewater
sludge 	except:
(l} 	In 	compliance with:
(A) 	A permit 	or department 	approval 	for 	use
of 	an 	individual 	wastewater 	system
obtained under 	this 	chapter;
(B) 	A registration under 	this 	chapter; 	or
(C} 	An 	exemption 	from permitting or
registration provided by section 11-62-
50.
(2) 	In a 	municipal 	solid waste 	landfill 	unit
which 	is 	in 	compliance 	with the 	sludge
related 	conditions 	in 	a 	permit 	issued under
chapter 	11-58.1:
(A) 	Where 	that 	permit 	was 	issued 	following
public participation procedures 	at
least 	as 	open to 	the 	public 	as 	those
specified 	in 	subchapter 	5; 	and
62-73
317 6 	1 1 1 ◄
§11-62-41
(B) 	Incorporates 	the 	requirements 	of 	40 	CFR
Part 	258.
(3) 	By incineration 	in a 	facility 	in compliance
with 	the 	requirements 	of 	40 	CFR 	Part 	503,
Subpart 	E, 	Incineration, 	and 40 	CFR §503.8,
Sampling and analysis , 	and §503.9, 	General
definitions;
(4) 	In a 	facility 	in 	compliance 	with the 	sludge
related conditions 	in 	a 	National 	Pollutant
Discharge 	Elimination System 	(NPDES) 	permit
issued under 	chapter 11-55 	or 	issued by the
U.S. 	EPA, 	where 	that 	permit 	includes 	or
incorporates 	the 	requirements 	of 	40 	CFR 	Part
503, 	Subpart 	B, 	Land Application, 	Subpart 	D,
Pathogens 	and Vector Attraction Reduction,
and 40 	CFR 	§503.8, 	Sampling and analysis ,
and 	§503.9 , 	General 	definitions 	and any
applicable 	requirements 	of 	this 	chapter;
(5) 	For hauling, 	by a 	county, 	state, 	or 	federal
agency , 	or by a 	person or 	an 	operation
registered under 	section 	ll-62-50(b) (4); 	or
(6) 	As 	otherwise 	authorized 	in writing by the
director.
(b) 	Direct 	enforceability . 	No 	person 	shall
generate, 	treat, 	prepare , 	store, 	haul , 	apply , 	place,
use, 	or dispose 	of 	wastewater 	sludge 	except 	in
compliance 	with 	the 	requirements 	of 	this 	chapter 	and
all 	applicable 	federal 	rules, 	whether or not 	a 	permit
has 	been 	issued or registration has 	been made .
(c) 	Exclusion. 	This 	chapter does 	not 	apply 	to
operations 	and 	facilities 	involved with 	the
collection, 	handling, 	storage, 	treatment, 	use ,
disposal, 	or transportation 	of 	the 	following:
(1) 	Wastewater 	sludge 	co-fired 	in 	an 	incinerator
with other wastes 	or 	incinerators 	in which
the 	wastewater 	sludge 	and other 	wastes 	are
co-fired;
(2) 	Wastewater 	sludge 	generated 	at 	an 	industrial
facility during 	the 	treatment 	of 	industrial
wastewater , 	including wastewater 	sludge
generated during 	the 	treatment 	of 	industrial
62-74
wastewater combined with domestic
wastewater;
§11-62-41.1
(3) 	Wastewater 	sludge 	determined to be 	hazardous
under 	state 	rule 	or 	federal 	regulation;
(4) 	Wastewater 	sludge 	containing polychlorinated
biphenyls 	(PCBs) 	equal 	to or greater 	than 	50
milligrams per kilogram of 	total 	solids 	(dry
weight 	basis);
(5) 	Incinerator ash generated during 	the 	firing
of 	wastewater 	sludge 	in 	a 	wastewater 	sludge
incinerator;
(6) 	Grit 	and 	screenings;
(7) 	Drinking water 	treatment 	sludge; 	and
(8) 	Commercial 	and 	industrial 	septage 	that
contains 	no domestic wastewater. 	[Eff 	and
comp 12/09/04; 	am and comp 	MAR 21 2016 	] 	(Auth:
HRS 	§342D-4, 	342D-5) 	(Imp: 	HRS 	§§342D-2, 	342D-4,
342D-5, 	342D-6, 	342D-50; 	40 	CFR Parts 	258, 	501, 	503,
40 	CFR 503 	Subparts 	B, 	C, 	D, 	E, 	40 	CFR 	§§501.15,
503.l{b), 	503.3, 	503.4, 	503.6, 	503.7, 	503 . 8, 	503 . 9)
§11-62-41.1 	Relation 	to 	federal 	law . 	(a) 	This
chapter 	shall 	be 	interpreted and applied 	so 	that 	it 	is
at 	least 	as 	stringent 	as 	40 	CFR 	Part 	503 	and 	so 	that
the 	department's 	sludge management 	program 	complies
with 40 	CFR Part 	501.
(b) 	No 	wastewater 	sludge generation, 	treatment ,
preparation, 	storage, 	hauling, 	application, 	placement,
use, 	or disposal 	shall 	be 	conducted unless 	allowed by
this 	chapter, 	even 	if 	allowed under 	40 	CFR 	Part 	503.
(c) 	References 	to 	the 	Code 	of 	Federal
Regulations 	(CFR) 	are 	to 	the 	July 1, 	1999 version, 	and
references 	to 	specific 	sections 	or 	subparts 	of 	the 	CFR
incorporate 	those 	regulations 	and make 	them part 	of
this 	chapter, 	whether 	or not 	the word 	incorporate 	is
specifically used, 	unless 	otherwise 	specifically
stated.
(d) 	Special 	definitions. 	For 	the 	purposes 	of
this 	chapter, 	when used 	in 40 	CFR 	Part 	503:
"Municipal 	solid waste 	landfill 	unit" 	has 	the
same 	meaning as 	defined 	in 40 	CFR Part 	258.
62-75
, 	17 6
§11-62-41.1
"Permitting authority" 	means 	the 	director.
11 Sewage 11 	means wastewater.
(e) 	No permit 	shall 	be 	issued when 	the 	United
States 	Environmental 	Protection Agency Administrator
for 	Region 	IX has 	objected in writing under 	40 	CFR
§123 . 44. 	[Eff 	and comp 	12/09/04; 	am and comp
MAR 2 1 2016 	] 	(Auth: 	HRS 	§342D-4,
342D-5) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5, 	342D-6,
342D-50; 	40 	CFR Parts 	258 , 	501, 	503, 	40 	CFR 	§§123.41 ,
123.42, 	123.44, 	501.2, 	501.18, 	501.19, 	501.20,
503.l(b), 	503 . 5, 	503 . 21, 	503.32)
§11-62-42 	Land application 	of 	except i onal
quality wastewater 	sludge. 	(a) 	Exceptional 	quality
wastewater 	sludge 	shall 	meet 	the 	following 	criteria 	at
a 	minimum:
(1) 	Pollutant 	limits. 	No 	pollutant
concentration shall 	exceed the 	ceiling
limits 	in Appendix D, 	Table 	IV.
(2) 	Pathogens. 	The 	Class A pathogen
requirements 	in 	section 	11-62-46(a) 	shall 	be
met.
(3) 	Vectors. 	One 	of 	the 	vector 	attraction
reduct i on 	requirements 	in 	40 	CFR
§503.33(b) {l) 	through 	(8) 	shall 	be 	met.
(b) 	Monitoring. 	Exceptional 	quality wastewater
sludge 	shall 	be monitored by 	the 	preparer 	at 	least 	as
often 	as 	required by 40 	CFR 	§ 	503.16(a). 	References
in 	§503.16(a) 	to 	federa l 	pollutant 	limit 	tables 	are
replaced with Appendix D, 	Table 	IV dated July 1, 	2014
and located 	at 	the 	end of 	this 	chapter. 	To determine
compliance 	with 	section 11 - 62-42 (a) (2) , 	wastewater
sludge 	shall 	be monitored not more 	than 	sixty days
before 	land ap pl ication or being bagged 	for
distribution un l ess 	otherwise 	s pecified by 	the
director. 	The 	director may also 	specify more
monitoring, 	to 	better protect 	human 	health or the
environment.
(c) 	Recordkeeping.
(1) 	The pre p arer of 	exceptional 	quality
wast e water 	s l udge 	that 	is 	applied to 	the
land 	shall 	meet 	the 	requirements 	of 	40 	CFR
62-76
§11-62-43
§503.17(a} (1), 	except 	the 	certification
requirement 	there;
(2) 	The preparer 	shall 	sign complete
certification 	form, 	form A, 	entitled
Certification 	Form 	- 	Land Application, 	dated
July 1, 	2014, 	and 	located 	at 	the 	end 	of 	this
chapter, 	in Appendix E, 	items 	1, 	2.a, 	and
3.a, 	and 	retain 	the 	form 	for 	five 	years; 	and
(3) 	The preparer 	shall 	develop 	and 	retain
information 	for 	five 	years 	on 	the volume 	of
wastewater 	sludge 	bagged, 	distributed, 	or
land applied.
(d) 	Reporting. 	The 	test 	results 	and 	records
required 	in 	subsections 	(b) 	and 	(c) 	shall 	be
kept 	on 	site 	and unless 	otherwise 	specified,
copies 	shall 	be 	submitted 	to 	the 	director on
February 	19 of 	each year.
{e) 	The 	exceptional 	quality 	sludge 	shall 	be
applied 	to 	the 	land at 	a 	rate 	that 	is 	less 	than 	ten
dry 	tons 	per 	acre 	and 	equal 	to 	or 	less 	than 	the
agronomic 	rate .
(1) 	The preparer 	shall 	provide 	to 	each land
applier 	a 	fact 	sheet 	which 	contains 	the
nitrogen, 	phosphorus, 	and potassium
concentrations 	of 	the 	wastewater 	sludge; 	and
(2) 	When 	the 	wastewater 	sludge 	is 	applied in
bulk 	to 	agricultural 	land, 	forest, 	a 	public
contact 	site, 	or a 	reclamation site, 	the
director may 	require 	a 	nutrient 	balance 	to
be 	submitted prior 	to 	the 	application to 	the
land. 	[Eff 	and comp 	12/09/04; 	comp
MAR 2 1 2016 	] 	(Auth: 	HRS 	§§342D-
4, . 342D-5) 	(Imp: 	HRS 	§§342D-2, 	342D-4,
342D-5, 	342D-6, 	342D-50; 	40 	CFR 	§§503.1,
503. s, 	503 .10, 	503 .13, 	503 .15 (a) , 	503 .16 (a) ,
503.17(a), 	503.18, 	503.32, 	503.33(b))
§11-62-43 	Land 	application of 	other 	than
exceptional 	quality wastewater 	sludge, 	to 	agricultural
land, 	forest, 	public 	contact 	site, 	or reclamation
site . 	(a) 	No 	person 	shall 	apply non-exceptional
quality wastewater 	sludge 	to 	land unless 	the 	land is
62-77
"3176
3 17 6 	I j[d
§11-62-43
agricultural 	land , 	forest, 	a 	public 	contact 	site , 	or a
reclamation 	site, 	and 	all 	the 	requirements 	of 	this
section 	are met .
(b) 	Pollutant 	limits . 	Non-exceptional 	quality
wastewater 	sludge 	shall 	not 	be 	land applied 	if 	the
concentration of 	any pollutant 	in the 	wastewater
sludge 	exceeds 	the 	ceiling 	limits 	in Appendix D, 	Table
IV dated July 1, 	2014, 	and 	located at 	the 	end of 	this
chapter.
(c) 	Pathogens . 	The 	Class A pathogen
requirements 	in 	section 	ll-62-46(a) 	or 	the 	Class 	B
pathogen 	requirements 	in 	40 	CFR 	§503.32 ( b) 	shall 	be
met 	for 	non-exceptional 	quality wastewater 	sludge.
(d) 	Vectors. 	One 	of 	the 	vector attraction
reduction requirements 	in 	40 	CFR 	§503 . 33(b) {l) 	through
(10) 	shall 	be met 	for 	non-exceptional 	quality
wastewater 	sludge.
(1) 	The preparer 	shall 	meet 	one 	of 	the
requirements 	of 	40 	CFR 	§503.33(b) {1) 	through
( 8) ; 	or
(2} 	The 	applier 	shall meet 	one 	of 	the
requirements 	of 	40 	CFR 	§503.33(b) (9) 	or
( 10) .
(e) 	Notice. 	The preparer 	of 	the 	non-exceptional
quality wastewater 	sludge 	shall 	inform 	in writing 	to
the 	land 	applier 	and 	the 	owner 	of 	the 	land 	application
site of:.
(1) 	The vector 	attraction 	reduction 	requirements
of 	40 	CFR 	§503 . 33(b) (9) 	and 	(10), 	if 	the
preparer did not 	use 	or 	meet 	any of 	the
requirements 	of 	40 	CFR 	§503.33(b) (1) 	through
( 8) ;
(2) 	The 	spacing 	and 	site 	restrictions 	in
subsection 	(g);
(3) 	The 	management 	requirements 	of 	subsection
(h); 	and
(4) 	The 	concentration of 	total 	nitrogen 	(as 	Non
a 	dry weight 	basis).
(f} 	Monitoring . 	Non-exceptional 	quality
wastewater 	sludge 	shall 	be 	monitored at 	least 	as 	often
as 	required by 40 	CFR 	§ 	503 . 16(a). 	References 	in
§503.16(a} 	to 	federal 	pollutant 	limit 	tables 	are
replaced with Appendix D, 	Table 	IV dated July 1, 	2014,
62-78
§11-62-43
and located at 	the 	end of 	this 	chapter. 	To determine
compliance with 	section ll-62-43(c), 	wastewater 	sludge
shall 	be monitored not more 	than 	sixty days 	before
land application unless otherwise 	specified by the
director. 	The 	director may also specify more
monitoring, 	to better protect 	human health or 	the
environment.
(g) 	Spacing and 	site 	restrictions 	for 	non-
exceptional 	quality 	sludge.
(1) 	Horizontal 	distances. 	The 	land 	application
of wastewater 	sludge 	shall meet 	the minimum
horizontal 	limits 	in Appendix D, 	Table VI.
(2) 	Vertical 	separation. 	The 	land application
of wastewater 	sludge 	shall be 	at 	least 	five
feet 	above 	the 	seasonal 	high groundwater
table.
(3) 	If 	the 	class 	B pathogen requirements are
met, 	the 	site 	restrictions 	in 40 	CFR
§503.32(b) (5) 	shall 	be 	met.
(h) 	Management practices . 	The management
practices 	required by 40 	CFR 	§503 .14 (a} 1 	(b) , 	(d) ,
(e) (1), 	and 	(e) (2) 	shall 	be met, 	and wastewater 	sludge
shall 	not 	be 	applied to 	the 	land 	so that 	either 	the
sludge 	or any pollutant 	from 	the 	sludge 	enters 	state
waters.
(i) 	Recordkeeping, 	preparers 	of 	non-exceptional
quality wastewater 	sludge.
(1) 	The preparer 	of 	the 	wastewater 	sludge which
meets 	the 	Class A pathogen 	requirements 	in
section 	11-62-48(a) 	shall 	develop 	and 	retain
for 	five 	years 	information on:
(A} 	The 	concentration of 	pollutants 	listed
in Appendix D, 	Table 	IV dated July 1,
2014, 	and located at 	the 	end of 	this
chapter; 	and
(B) 	A description of 	how 	the 	pathogen
requirements 	in 	section 	11-62-48(a) 	are
met.
(2) 	The 	preparer of wastewater 	sludge 	which
meets 	the 	class B pathogen 	requirements 	in
40 	CFR 	§503.32(b) 	shall 	develop 	and 	retain
for 	five 	years 	information on:
62-79
317 6
31 7 6 	~1•
§11-62-43
(A) 	The 	concentration 	of pollutants 	listed
in Appendix D, 	Table 	IV dated July 	1,
2014, 	and located at 	the 	end 	of 	this
chapter;
(B) 	A description of 	how 	the 	pathogen
requirements 	in 	40 	CFR 	§503.32(b) 	are
met; 	and
(C) 	A description of 	how one 	of 	the 	vector
attraction 	reduction requirements 	of 	40
CFR 	§503.33{b) {l) 	through 	(8) 	is met,
when one 	is met.
(3) 	The preparer 	shall 	sign 	and complete
certification form, 	form A entitled
Certification Form 	- 	Land Application 	dated
July 1, 	2014, 	and 	located at 	the 	end of 	this
chapter, 	in Appendix 	E, 	items 	1, 	2, 	and 	3,
and 	retain 	the 	form 	for 	five 	years; 	and
(4) 	The 	preparer 	shall 	develop 	and 	retain 	for
five 	years 	information on 	the volume 	of
wastewater 	sludge prepared 	for 	land
application, 	names 	of persons 	taking
wastewater 	sludge 	from 	the 	facility, 	the
date 	and time 	the wastewater 	sludge 	was
taken, 	and 	the 	amount 	taken.
(j) 	Recordkeeping, 	appliers 	of non-exceptional
quality wastewater 	sludge 	to 	the 	land.
(1) 	The 	applier 	shall 	meet 	the 	information
requirements 	of 	40 	CFR 	§503.17(a) (3) (ii) (B)
and 	( C) ; 	or 	§ 5 O3 . 1 7 (a) ( 4 ) (ii ) (B) , 	( C) , 	( D) ,
and 	(E);
(2) 	The 	applier 	shall 	sign and complete 	the
certification form, 	form A entitled
Certification Form 	- 	Land Application, 	July
1, 	2014, 	and 	located at 	the 	end of 	this
chapter, 	in Appendix E, 	items 	4, 	5, 	and 	6,
and 	retain the 	form 	for 	five 	years; 	and
(3) 	The 	applier 	shall 	develop and 	retain 	for
five 	years 	the 	following 	information:
(A) 	The 	location, 	including 	street 	address
and 	tax map key number, 	of 	the 	site 	on
which wastewater 	sludge 	is 	applied;
(B) 	The 	number of 	acres 	in each 	site on
which wastewater 	sludge 	is 	applied;
62-80
§11-62-44
(C) 	The date 	and time 	the 	wastewater 	sludge
is 	applied 	to each 	site;
(D) 	The 	amount 	of wastewater 	sludge 	applied
to 	each 	site; 	and
(E) 	A nutrient balance.
(k) 	Reporting. 	The 	test 	results 	and 	records
required in 	subsections 	(f), 	(i), 	and 	(j) 	shall 	be
kept 	on 	site and unless 	otherwise 	specified copies
shall 	be 	submitted to 	the 	director on February 	19 	of
each year.
(1) 	Notification to other 	states. 	Any person
who prepares wastewater 	sludge 	that 	is 	land
applied in another 	state 	shall 	provide
written notice, 	prior 	to 	the 	initial 	land
application, 	to 	the 	permitting 	authority 	for
the 	state 	in which the 	bulk 	in which the
wastewater 	sludge 	is 	to be 	applied to 	the
land 	in accordance 	with 40 	CFR 	§503.12(i).
[Eff 	and comp 	12/09/04; 	am and comp
MAR 2 1 2016 	] 	(Auth: 	HRS 	§342D-4,
342D-5) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-
5, 	342D-6, 	342D-50; 	40 	CFR 	§§503.12,
503 .13 (b), 	503 .14, 	503 .15 (a) , 	(c) ,
503 . 16 (a) / 	503 .17 / 	503 .18 I 	503 • 32 I
503. 33 (b) )
§11-62-44 	Land application of 	domestic 	septage
to 	agricultural 	land, 	forest, 	or 	reclamation 	site.
(a) 	No 	person 	shall 	apply domestic 	septage 	to 	land
unless 	the 	land 	is 	agricultural 	land, 	forest, 	or 	a
reclamation 	site 	if 	the 	annual 	application 	rate 	(AAR)
exceeds 	1/0.0026 	the 	amount 	of 	nitrogen 	(N) 	in pounds
per 	acre 	per 	365 day period needed by 	the 	crop 	or
vegetation growth on the 	land.
N
AAR = 	Equation 	(1)
0.0026
(b) 	Pathogens. 	The pathogen 	requirements 	of
(1) 	40 	CFR 	§503 .32 (c) (1); 	or
62-81
317 6
3176 	1 1
§11-62-44
(2) 	40 	CFR 	§503 . 32(c) (2), 	including 	the 	site
restrictions 	of 	40 	CFR 	§503 .32 (b) (5) (i)
through 	(iv), 	shall 	be 	met 	for 	domestic
septage.
(c) 	Vectors. 	One 	of 	the 	vector 	attraction
reduction 	requirements 	in 40 	CFR 	§503. 33 (b) ( 9) , 	(10) ,
or 	(12) 	shall 	be met 	for 	domestic 	septage.
(d} 	Monitoring. 	If 	either 	the 	pathogen
requirement 	in 	subsection 	(b) (2) 	or vector 	attraction
reduction 	requirement 	in 	40 	CFR 	§503.33(b} (12)
applies, 	each 	container 	of 	domestic 	septage 	shall 	be
monitored 	for 	compliance 	with 	those 	requirements. 	The
director may specify more 	monitoring, 	to better
protect human health 	or 	the 	environment.
(e) 	Recordkeeping.
(1) 	The 	applier 	shall 	meet 	the 	information
requirements 	of 	40 	CFR §503.17(b) (2), (3),
( 4 ) , { 5 ) , {7 ) , 	and 	( 8 ) ;
(2) 	The 	applier 	shall 	develop and 	retain 	for
five 	years 	the 	location, 	including 	street
address 	and 	tax map key number, 	of 	the 	site
on which 	septage 	is 	applied; 	and
(3) 	The 	applier 	shall 	sign and complete 	the
certification 	form, 	form A entitled
Certification 	Form 	- 	Land Application 	dated
July 1, 	2014 , 	and 	located at 	the 	end 	of 	this
chapter, 	in Append i x 	E, 	items 	7, 	8, 	9, 	and
10, 	and 	retain 	the 	form 	for 	five 	years.
(f) 	Reporting. 	The 	test 	results 	and 	records
required 	in 	subsection 	(e) 	shall 	be 	kept 	on 	site 	and
unless 	otherwise 	specified 	copies 	shall 	be 	submitted
to 	the 	director on 	February 	19 	of 	each year.
(g} 	Spacing and 	site 	restrictions.
(1) 	Horizontal 	distances. 	The 	land application
of 	domestic 	septage 	shall 	meet 	the 	minimum
horizontal 	limits 	in Appendix D, 	Table 	VI
dated July 	1 , 	2014, 	and 	located at 	the 	end
of 	this 	chapter.
(2) 	Vertical 	separation . 	The 	land application
of 	domestic 	septage 	sha l l 	be 	at 	least 	five
feet 	above 	the 	seasonal 	high groundwater
table.
62-82
§11-62-46
(3) 	The 	site 	restrictions 	in:
(A) 	40 	CFR 	§503. 32 (b) (5); 	or
(B) 	The 	pathogen 	requirement 	of 	40 	CFR
§503.32{c} (2) 	and the 	site 	restrictions
of 	40 	CFR 	§503.32{b) (5) (i) 	through 	{iv)
shall 	be 	met 	for 	domestic 	septage.
(h) 	Management practices. 	The management
practices 	required by 40 	CFR 	§503.14(a), 	(b), 	(d),
(e) (1), 	and 	(e) (2)for wastewater 	sludge 	shall 	be 	met
for 	domestic 	septage, 	and domestic 	septage 	shall 	not
be 	applied to 	the 	land 	so 	that 	the 	septage or any
pollutant 	from 	septage 	enters 	state waters. 	[Eff 	and
comp 	12/09/04; 	am and comp 	MAR 2 I 	2016 	]
(Auth: 	HRS 	§342D-4, 	342D-5) 	(Imp: 	HRS 	§§342D-2,
342D-4, 	342D-5, 	342D-6, 	342D-50; 	40 	CFR 	§§503.12(c),
503 .13 (c) , 	503 .14, 	503 .15 (b) , 	(d) , 	503 .16 {b) , 	503 .17,
503.18, 	503.32, 	503.33)
§11-62-45 	REPEALED 	[R 	MAR 2 1 2016
§11-62-46 	Pathogens. 	(a) 	Wastewater 	sludge 	-
class A . 	(1) 	The 	requirements 	of 	this 	subsection
shall 	be met 	for 	a 	wastewater 	sludge 	to 	be 	classified
exceptional 	quality 	sludge 	or 	class A with 	respect 	to
pathogens.
(2) 	One 	of 	the 	class A requirements 	in
paragraphs 	(3), 	(4), 	{6) 	or 	(7) 	shall 	be met, 	or with
the 	prior approval 	of 	the 	director 	paragraph 	(5) 	shall
met . 	The 	requirements 	in paragraphs 	(3) 	through 	(7)
shall 	be 	met 	before 	or 	at 	the 	same 	time 	that 	the
vector 	attraction reduction requirements 	in 	40 	CFR
§503.33 	are 	met, 	unless 	one 	of 	the vector 	attraction
reduction 	requirements 	in 40 	CFR 	§503.33(b} (6} 	through
(B) 	is 	met.
(3) 	Class A 	- 	alternative 	1. 	The 	requirements
of 	40 	CFR 	§503 . 32(a) (3) 	apply, 	except 	that
the 	requirements 	of 	§503.32(a) (3) (i) 	are
replaced with those 	of paragraph 	(B).
(4) 	Class A 	- 	alternative 	2. 	The 	requirements
62-83
3176
31 7 6 	uJJ'
§11-62-46
of 	40 	CFR 	§503.32(a) (4) 	apply, 	except 	that
the 	requirements 	of 	§503. 32 (a) (4) (i) 	are
replaced with those 	of paragraph 	(8).
(S) 	Class A 	- 	alternative 	3. 	The 	requirements
of 	40 	CFR 	§503 . 32(a) (6) 	apply, 	except 	that
the 	requirements 	of 	§503. 32 (a) (6) (i) 	are
replaced with those 	of paragraph 	(8).
(6) 	Class A 	- 	alternative 	4. 	The 	requirements
of 	paragraph 	(8), 	and 	subsection 	(d),
Process 	to 	Further Reduce 	Pathogens 	(PFRP),
apply.
(7) 	Class A 	- 	alternative 	5. 	The 	requirements
of 	paragraph 	(8) 	apply and, 	as 	determined by
the 	director, 	a 	process 	equivalent 	to 	one 	in
subsection 	(d), 	Process 	to 	Further 	Reduce
Pathogens 	(PFRP), 	shall 	be used.
(8) 	Pathogen density at 	the 	time 	the 	wastewater
sludge 	is used, 	disposed, 	or prepared 	for
sale 	or give 	away 	in 	a 	bag 	or 	other
container 	for 	land 	application, 	shall 	meet
the 	following:
(i) 	Unless 	otherwise 	specified by the
director, 	seven 	samples 	shall 	be
analyzed; 	and
(ii) 	For 	each 	sample 	the 	fecal 	coliform
shall 	be 	less 	than 1000 	MPN per gram of
total 	solids 	(dry weight 	basis) 	or 	for
each 	sample 	the 	Salmonella sp . 	bacteria
shall 	be 	less 	than 	three 	MPN per 	four
grams 	of 	total 	solids 	(dry weight
basis) .
(b) 	Wastewater 	sludge 	- 	class 	B. 	The
requirements 	of 	40 	CFR 	§5 0 3.32(b) 	shall 	b e 	met 	for 	a
wastewater 	sludge 	to 	be 	classified 	class 	B with
respect 	to 	pathogens .
(c) 	Domestic 	septage. 	The 	requirements 	of 	40
CFR 	§503.32(c) 	apply.
(d) 	Processes 	to 	further 	reduce 	pat h ogens
(PFRP). 	The 	requirements 	of 	40 	CFR Part 	503 , 	appendix
B, 	Pathogen Treatment 	Proce s ses, 	section B, 	Processes
to 	Further Reduce 	Pathogens, 	apply, 	except 	for 	section
B.l 	which 	is 	replaced by paragraph 	(1).
(1) 	Composting .
62-84
§11-62-46
(A) 	Windrow. 	The 	temperature 	of 	the
wastewater 	sludge 	is 	maintained at 	55
degrees 	Celsius 	or higher 	for 	at 	least
fifteen 	consecutive 	days 	during 	the
composting period. 	In addition, 	during
the 	high temperature period, 	the
windrow must 	be 	turned at 	least 	five
times 	and 	turned 	at 	least 	once 	every
three days.
(B) 	Static aerated pile. 	The 	wastewater
sludge must 	be 	maintained 	at 	operating
temperatures 	of 	55 	degrees 	Celsius 	or
greater 	for 	three 	consecutive days.
(C) 	Within vessel 	method. 	The wastewater
sludge must 	be 	maintained 	at 	operating
temperatures 	of 	55 	degrees 	Celsius 	or
greater 	for 	three 	consecutive days.
(2) 	Heat 	Drying. 	See 	Part 	503, 	appendix B,
section B.2.
(3) 	Heat 	Treatment. 	See 	Part 	503, 	appendix B,
section B.3.
(4) 	Thermophilic Aerobic Digestion. 	See 	Part
503, 	appendix B, 	section B.4.
(5) 	Beta 	ray irradiation. 	See 	Part 	503,
appendix B, 	section B.5.
(6) 	Gamma 	ray irradiation. 	See 	Part 	503,
appendix B, 	section B.6.
(7) 	Pasteurization. 	See 	Part 	503, 	appendix B,
section B.7.
(e) 	Processes 	to 	significantly reduce 	pathogens
(PSRP). 	The 	requirements 	of 	40 	CFR Part
503, 	appendix B, 	Pathogen Treatment
Processes, 	section A, 	Processes 	to
Significantly Reduce 	Pathogens, 	apply.
(1) 	Aerobic Digestion. 	See 	Part 	503, 	appendix
B, 	section A.l.
(2) 	Air Drying. 	See 	Part 	503, 	appendix B,
section A.2.
(3) 	Anaerobic Digestion. 	See 	Part 	503, 	appendix
B, 	section A.3 .
(4) 	Composting. 	See 	Part 	503, 	appendix B,
section A.4.
(5) 	Lime 	Stabilization. 	See 	Part 	503, 	appendix
62-85
~176
3 1 7 6 	. L.,jw
§11-62-47
B, 	section A.5. 	I~f~ and comp 12/09/04;
comp 	MAR 2 1 ZD1D 	] 	(Auth: 	HRS
§342D-4, 	342D-5} 	(Imp: 	HRS 	§§342D-2, 	342D-
4, 	342D-5, 	342D-6, 	342D-50; 	40 	CFR Part 	503,
Subpart D, 	Appendix B, 	40 	CFR 	§503 . 32)
§11-62-47 	Vector 	attraction reduction. 	(a)
Requirements 	for 	land application .
(1) 	One 	of 	the 	vector 	attraction 	reduction
requirements 	in 	40 	CFR 	§503.33(b} (1) 	through
{8} 	shall 	be met 	before 	exceptional 	quality
wastewater 	sludge 	is 	land applied.
{2) 	The 	requirements 	of 	40 	CFR 	§503 . 33(a) (1),
(4), 	and 	( S} 	apply .
{b) 	Vector 	attraction reduction requirements .
The 	requirements 	of 	40 	CFR §S03.33(b) 	apply. 	[Eff 	and
comp 12/09/04; 	comp 	MAR 21 2016 	] 	(Auth: 	HRS
§342D-4, 	342D-5) 	(I mp: 	HRS 	§§342D-2 , 	342D-4,
342D-5,342D-6, 	342D-5 0 ; 	40 	CFR Part 	503 , 	Subpart 	D, 	40
CFR 	§503.33}
§11-62-48 	Sampling method . 	Samples 	of wastewater
sludge 	that 	is 	applied 	to 	the 	land, 	[ placed on a
surface disposal 	site,] 	fired 	in a 	wastewater 	sludge
incinerator, 	or 	disposed 	into 	a 	solid waste 	landfill
or any other wastewater 	system 	shall 	be 	collected and
analyzed using 	the methods 	specified 	in 40 	CFR 	§503.8.
[ Eff 	and comp 	12/09/04; 	comp 	MAR 2 1 2016 	J
(Auth: 	HRS 	§342D-4, 	342D-5) 	{Imp : 	HRS 	§§342D-2,
342D-4, 	342D-5, 	342D-6, 	342D-50; 	40 	CFR 	§503 . 8)
SUBCHAPTER 5
WASTEWATER MANAGEMENT 	PERMITS AND REGISTRATION
§11-62-50 	Registration and permits . 	(a) 	Owners
and operators 	are 	not 	required under 	this 	subchapter
to 	register or 	obtain 	any 	permit 	coverage 	for 	their:
62-86
§11-62-50
(1) 	Individual 	wastewater 	systems 	(e.g.,
cesspools, 	septic 	tanks, 	and household
aerobic 	units);
(2) 	Land on which exceptional 	quality wastewater
sludge 	is 	applied;
(3) 	Land application or land placement
operations 	involving only exceptional
quality wastewater 	sludge;
(4) 	Operations, 	such as 	businesses, 	that 	haul
only exceptional 	quality wastewater 	sludge;
or
(5) 	Non-domestic wastewater treatment 	works,
unless 	deemed necessary by 	the 	director.
(b) 	Owners 	or operators 	or both of 	the 	following
shall 	register 	with the 	department:
(1) 	Land on which non-exceptional 	quality sludge
is 	applied or placed, 	with or without 	the
landowner's permission;
(2) 	Land on which non-exceptional 	quality 	sludge
is 	stored for 	less 	than 	two years, 	if 	the
land 	is 	different 	from 	the 	treatment 	works
which generated the 	sludge;
(3) 	Land application or 	land placement
operations 	for 	non-exceptional 	quality
wastewater 	sludge, 	whether 	or not 	the
wastewater 	sludge 	is 	applied or placed on
land with the 	landowner's permission;
(4) 	Operations, 	such as 	businesses , 	that 	haul
wastewater 	or wastewater 	sludge, 	or both,
including grease haulers 	and cesspool
pumpers, 	except 	those 	operations 	that 	only
haul 	exceptional 	quality sludge; 	and
(5) 	Other 	facilities, 	operations, 	or 	land, 	if
directed by the director.
(c) 	Owners 	or 	operators 	or both 	shall 	obtain 	an
individual 	permit 	for 	their:
(1) 	Treatment works 	that 	generate wastewater
sludge 	that 	is 	directly 	land applied;
(2) 	If 	different 	from 	the 	generator, 	facilities
or operations 	that 	treat 	or prepare
wastewater 	sludge 	that 	is 	land applied or
surface 	disposed;
(3) 	Treatment 	works 	not 	located 	in the 	State but
62-87
3176 1
§1 1-62-50
generate 	wastewater 	sludge 	that 	is 	directly
land applied in 	the State;
(4) 	Facilities 	or 	operations 	not 	located 	in the
State 	that 	treat 	or prepare wastewater
sludge 	that 	is 	land applied or 	surface
disposed 	in the 	State; 	and
(5) 	Other 	facilities, 	operations, 	or 	land, 	if
directed by the 	director.
(d) 	The 	department 	may accept 	and 	issue
consolidated 	registrations 	and individual permits
(collectively 11 authorizations 11 ), 	and for 	the
consolidated authorizations 	the 	department may charge
the 	fee 	for 	only the 	most 	expens i ve 	authorization .
The 	department 	may 	also 	charge 	the 	fees 	for 	all 	or
so me 	of 	the 	authorizations . 	[Eff 	and 	comp 12/09/04;
am and comp 	MAR 21 2016 	] 	(Auth: 	HRS 	§§342D-4,
342D - 5 , 	342D-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5,
342D-6 , 	342D-13, 	342D-50; 	40 	CFR §§501.15, 	503.3(a) )
§11-62-51 	Fees. 	(a) 	Registration. 	Every
registrant 	shall 	pay a 	fili n g 	fee 	according 	to 	this
subsection . 	The 	filing 	fee 	shall 	be 	submitted with
the 	registration and 	shall 	not 	be 	refunded nor 	applied
to any later 	registration 	after 	filing 	or 	denial 	of 	a
registration. 	Fees 	shall 	be 	made 	payable 	to 	the 	State
of 	Hawaii.
{1) 	For 	a 	new operation, 	facility , 	or 	land , 	the
fee 	is 	$30;
(2) 	For major 	changes 	in the 	registration of 	an
operation , 	facility, 	or 	land, 	the 	fee 	is
$30;
(3) 	For 	renewal, 	the 	fee 	is 	$10;
(4) 	To 	change 	only 	ownership 	shown 	in a
registration , 	the 	fee 	is 	$5; 	and
(5) 	To make 	other 	changes 	in a 	reg i strat i on, 	the
fee 	is 	$10;
(b) 	Individual 	permits. 	Every person applying
for 	an individual 	permit, 	its 	modification, 	or renewal
s h all 	pay a 	filing 	fee 	according 	to 	this 	subsection .
This 	filing 	fee 	shall 	be 	submitted with the
application 	for 	the permit 	or permit 	modification and
shall 	not 	be 	refunded nor 	applied 	to 	any subsequent
62-88
3176 	I .i i 1
§11-62-51
individual 	after 	final 	issuance 	or denial. 	Fees 	shall
be made 	payable 	to 	the 	State 	of 	Hawaii.
(1) 	To apply for 	an 	individual 	permit 	for 	a 	new
or existing 	operation or 	facility, 	the 	fee
is 	$1000;
(2) 	To apply to modify an 	individual 	permit 	to
cover a 	substantial 	alteration or addition
to an 	operation, 	facility, 	or 	land, 	the 	fee
is 	$1000;
(3) 	To renew an 	individual permit 	for 	an
existing 	operation or 	facility, 	the 	fee 	is
$1000;
(4) 	To transfer 	ownership or 	to modify an
individual 	permit 	to 	show only a 	change 	in
ownership, 	the 	fee 	is 	$25; 	and
(5) 	To apply to modify an 	individual 	permit 	to
cover a 	change 	other than 	those 	covered
above, 	the 	fee 	is 	$100.
(c) 	Late 	fees. 	Every person who 	fails 	to
submit 	complete 	forms 	for 	a 	new or 	renewed
registration or a 	complete 	application 	for 	a 	new
or 	renewed 	individual permit 	when 	required by 	this
chapter, 	shall 	pay a 	late 	fee. 	Fees 	shall 	be payable
to 	the 	State 	of 	Hawaii. 	Late 	submission of 	required
fees 	and registration 	forms, 	notice 	of 	intent, 	or
individual permit 	application does 	not 	excuse 	a 	person
from 	liabilities 	for 	any violations 	due 	to 	the 	lack of
a 	required 	registration or 	individual 	permit.
(1) 	The 	fee 	for 	submitting a 	registration 	form
late 	is 	$5;
(2) 	The 	fee 	for 	submitting an 	application 	for 	an
individual 	permit 	late 	is 	$250.
(d) 	Relation 	to other 	fees . 	The 	foregoing 	fees
are 	subject 	to 	section 	ll-62-50(e) 	and 	do 	not 	include
any public participation 	costs 	(for notices, 	hearings,
etc . ) 	that 	the would-be 	registrant 	or permittee 	may be
required 	to 	pay under 	other 	sections. 	[Eff 	and 	comp
12 / O9 / 04; 	am 	and comp 	MAR 2 1 2016 	(Auth: 	HRS
§§342D-4, 	342D-S) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5,
342D-13, 	342D-50)
62-89
'5176
§11-62-52
§11-62-52 	Signatories 	and certification
requirements. 	{a ) 	Unless 	otherwise 	specified, 	each
registration, 	notice 	of 	intent, 	permit 	application,
and any 	information 	required 	to 	be 	submitted to 	the
director 	shall 	be 	signed and certified as 	required by
40 	CFR 	§122.22.
(b) 	Each person who 	knowingly makes 	any 	false
statement, 	representation, 	or 	certification in any
app l ication, 	record, 	report, 	plan , 	or 	other
documentation 	submitted or required 	to be maintained
under 	this 	chapter or who 	knowingly falsifies, 	tampers
with, 	or 	renders 	inaccurate 	any monitoring 	device 	or
method required 	to be 	maintained under 	this 	chapter 	is
subject 	to 	the 	penalties 	and remedies 	in R~~tion
1 1-62-72. 	[Eff 	and comp 	12/09/04; 	comp 	MAK 2 1 2016
(Auth: 	HRS 	§§342D-4, 	342D-5, 	342D-6) 	(Imp : 	HRS
§§342D-2, 	342D-4, 	342D-5, 	342D-6; 	40 	CFR 	Parts 	122,
501, 	40 	CFR §§122 . 22, 	§501 . 15 (a) (4) , 	(b) (11))
§11-62-53 	Wastewater management 	registration.
{a) 	Timing. 	Completed registrations 	forms 	required
under 	section 11-62-50 	shall 	be 	submitted 	as 	follows.
(1) 	For 	existing 	lands, 	facilities, 	and
operations , 	not 	later 	than 	ninety 	days 	after 	the
effective 	date 	of 	this 	rule; 	and
(2) 	For new 	lands, 	facilities, 	and operations,
no 	later 	than 	one 	hundred eighty 	days 	before
such lands , 	facilities, 	or 	operations 	are
used or begin 	activity.
(b) 	Registration 	information 	and 	forms .
Registrants 	shall 	complete 	and 	submit 	one 	original 	and
one copy of 	the 	form(s) 	furnished 	by the 	director.
Registrants 	shall provide 	at 	least 	the 	following
information:
(1) 	Activities 	conducted 	by 	the 	applicant 	which
require 	registration;
{2) 	Name , 	mailing 	address, 	and location 	of 	the
wastewater or wastewater 	sludge 	collection,
handling, 	storage, 	treatment, 	use, 	disposal,
or transportation 	facility, 	operation, 	or
land ;
(3) 	Owner's 	name, 	mailing 	address, 	telephone
62-90
§11-62-53
number, 	ownership 	status, 	and 	status 	as
federal, 	state, 	private, 	public, 	or other
entity; 	and
(4) 	Operator 1 s 	name 	and certification number
under 	chapter 	11-61, 	if 	applicable.
(c) 	The 	director may 	require 	the 	submission of
additional 	information after 	registration 	forms 	have
been 	submitted.
(d) 	Records. 	Registrants 	shall 	keep 	records 	of
all 	data used 	to 	complete 	registrations 	and any
supplemental 	information 	submitted under 	this 	section
for 	at 	least 	five 	years 	from 	the date 	the 	registrant
submits 	the 	registration 	form, 	unless 	otherwise
specified by the 	director.
(e) 	Fees. 	Each registrant 	shall 	pay the 	filing
fee 	specified 	in 	section 11-62-51 	for 	each 	facility,
operation, 	or 	land registered, 	except 	as 	the 	director
may 	provide 	under 	section 	ll-62-50(e).
(f) 	Term. 	Registrations 	expire 	on November 	15
of 	each even-numbered year.
(g) 	Renewals. 	Renewal 	registration 	forms 	shall
be 	submitted by November 15. 	If 	a 	renewal
registration 	form 	is 	not 	submitted on 	time, 	it may be
submitted after payment 	of 	the 	current 	annual 	fee 	and
a 	late 	payment 	fee. 	If 	a 	renewal 	registration 	form 	is
submitted more 	than ninety days 	after 	it 	is 	due, 	then
the 	registrant 	shall 	supply all 	the 	information
required for 	a 	new 	registration 	regardless 	of 	whether
there 	have 	been 	any changes 	to 	report.
(h} 	Automatic 	filing. 	Registrations 	shall 	be
deemed filed 	automatically 	sixty days 	after
submission, 	or on the 	next 	working 	day after 	sixty
days 	expire, 	unless 	the director 	suspends
registration.
(i) 	Filing 	suspension. 	If 	the 	director
considers 	a 	registration 	form 	incomplete, 	lacking
payment 	of 	all 	or part 	of 	the 	fee, 	otherwise
deficient, 	or considers 	more 	information necessary,
the 	director 	shall 	order 	that 	the 	land, 	operation, 	or
facility 	shall 	not 	be 	registered until 	the 	registrant
has 	supplied the missing 	information or otherwise
corrected the 	deficiency. 	[Eff 	and 	comp 	12/09/04;
comp 	MAR 2 1 2016 	] 	(Auth: 	HRS 	§§342D-4, 	342D-5,
62-91
"3176
131 7 6 	r 1t f
§11-62-54.01
342D-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-6, 	342D-13)
§11-62-54 . 01 	Wastewater management 	individual
permits. 	(a) 	Timing. 	Applications 	for 	individual
permits 	required under 	section 	11-62-50 	shall 	be
submitted 	as 	follows:
(1) 	For existing 	lands, 	facilities, 	operations,
and lands, 	not 	later 	than one year 	after 	the
effective 	date 	of 	this 	section; 	and
(2) 	New facilities, 	operations, 	and 	lands, 	not
later than one hundred eighty days 	before
the 	facilities, 	operations, 	or 	lands 	are
used or begin 	activity. 	The 	director may
waive 	this 	one hundred eighty day
requirement 	by 	issuing 	the 	permit 	before 	the
one hundred eighty days 	expire .
(b) 	Information and 	forms. 	Applicants 	for
individual 	permits 	shall 	complete 	and submit 	one
original 	and one 	copy of 	the 	forrn(s)furnished 	by 	the
director . 	Applicants 	shall provide 	at 	least 	the 	type
of 	information required 	by 	40 	CFR 	Part 	501 	and 	the
following 	information:
(1) 	The 	type 	of 	activities 	conducted by 	the
applicant 	which 	requires 	a 	permit 	to be
obtained;
(2) 	The name, 	mailing 	address, 	and 	location of
the 	wastewater or wastewater 	sludge
collection, 	handling, 	storage, 	treatment,
use, 	disposal, 	or 	transportation 	facility ,
operation, 	or 	land;
(3) 	The owner's 	name, 	address, 	telephone 	number,
ownership 	status, 	and 	status 	as 	federal,
state, 	private, 	public, 	or other 	entity;
(4) 	The 	operator's 	name, 	address , 	telephone
number, 	ownership 	status, 	status 	as 	federal,
state, 	private , 	public 	or other 	entity, 	and
operator ' s 	certification number 	under
chapter 	11-61, 	if 	applicable;
(5) 	A listing 	of 	all 	environmental 	permits
received or applied, 	including 	all 	federal,
state, 	or 	local 	permits;
(6) 	A 	topographical 	map or other map 	if 	a
62-92
§11-62-54.01
topographical 	map 	is 	unavailable 	extending
one mile 	beyond the 	property boundaries 	of
the 	sludge 	management 	facility, 	depicting
the 	treatment 	and disposal 	sites, 	the
location of 	all 	water bodies, 	and the
locations 	of 	potable water wells within one-
quarter mile 	of 	the 	property boundaries;
(7) 	Any sludge 	monitoring 	data and for 	land
application, 	any available 	groundwater
monitoring data, 	with a 	description of 	the
well 	locations 	and 	approximate 	depth to 	the
groundwater;
(8) 	A description of 	the 	applicant 1 s 	sludge use
and disposal 	practices, 	including where
applicable, 	the 	location of 	any sites where
the 	applicant 	transfers 	wastewater 	sludge
for 	treatment, 	disposal, 	or both, 	as 	well 	as
the 	name 	of 	the 	applier who applies 	the
wastewater 	sludge 	to 	the 	land if 	different
from 	the 	applicant, 	and 	the name 	of 	any
distributors 	when 	the 	sludge will be
distributed, 	if 	different 	from 	the
applicant;
(9) 	For 	each 	land application 	site 	the 	applicant
will 	use 	during 	the 	life 	of 	the 	permit, 	the
applicant 	will 	supply 	information necessary
to 	determine 	if 	the 	site 	is 	appropriate 	for
land application and a 	description of 	how
the 	site 	is, 	or will 	be 	managed. 	Applicants
intending to apply wastewater 	sludge 	to 	land
application 	sites 	not 	identified at 	the 	time
of 	application must 	submit 	a 	land
application plan which at 	a 	minimum:
(A) 	Describes 	the geographical 	area covered
by the 	plan;
(B) 	Identifies 	the 	site 	selection criteria;
(C) 	Describes 	how 	the 	site will 	be 	managed;
(D) 	Provides 	for 	advanced notice 	to 	the
director of 	specific 	land application
sites; 	and
(E) 	Provides 	for 	advance public notice and
notice 	to 	landowners 	and occupants
adjacent 	to or abutting 	the 	proposed
62-93
3176
§11-62-54 . 01
land application 	site;
(10) 	Annual 	sludge 	production volumes; 	and
(11) 	Any 	information 	required 	to determine 	the
appropriate 	standards 	for permitting under
40 	CFR 	Part 	503 .
(c) 	The 	director 	may require 	the 	submission of
additional 	information 	after 	an 	individual permit
application has 	been 	submitted .
(d) 	Records. 	Applicants 	shall 	keep 	records of
all 	data 	used 	to 	complete 	permit 	applications 	and any
supplemental 	information 	submitted under 	this 	section
for 	a 	period of 	at 	least 	five 	years 	from 	the 	date 	the
application 	is 	submitted, 	unless 	otherwise 	specified
by the 	director .
(e) 	Fees. 	Every applicant 	for 	an 	individual
permit 	shall 	pay 	the 	filing 	fee 	specified 	in 	section
11-62-51 	for 	each 	f a c i li t y, 	operation, 	or 	land to 	be
permitted , 	except 	as 	the 	director may 	provide under
section 	11-62-SO(e).
(f) 	Processing 	suspension. 	If 	the 	director
considers 	permit 	application 	incomplete, 	lacking
payment 	of 	the 	fee, 	otherwise 	deficient, 	or 	considers
more 	information necessary, 	the 	director 	shall 	order
that 	the 	permit 	application 	shall 	not 	be processed or
a 	permit 	issued until 	the 	applicant 	supplies 	the
missing 	information 	or 	otherwise 	corrects 	the
deficiency. 	[Eff 	and comp 	12/09/04; 	am and comp
MAR 21 2016 	] 	(Auth : 	HRS 	§§342D-4, 	342D-5,
342D-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-6, 	342D - 13,
342D-50; 	40 	CFR 	Part 	501 , 	40 	CFR §501.15(a), (d ) )
§11-62-54.02 	Draft 	individual 	permits. 	After an
application 	for 	a 	new, 	modified, 	o r 	renewed permit 	is
complete, 	the 	director 	shall 	tentatively decide 	to
prepare a 	draft 	individual 	permit 	or 	deny 	the
application. 	If 	the 	director 	t entatively proposes 	to
revoke 	and reissue 	a 	permit , 	the 	director 	shall
prepare 	a 	draft 	individual 	permit . 	A draft 	permit
shall 	contain t he 	n ecessary conditions 	to 	implement
the 	requirements 	of 	this 	chapter, 	33 	U. S . C . 	§1345, 	and
the 	incorporated 	sections 	of 	40 	CFR Parts 	501 	and 	503.
62-94
I~ 17 6 	t J
§11-62-54.04
[Eff 	and comp 12/09/04; 	comp 	MAR 21 2016 	(Auth:
HRS 	§§342D-4, 	342D-5, 	342D-6) 	(Imp: 	HRS 	§§342D-2,
342D-4, 	342D-5, 	342D-6; 	40 	CFR Part 	501, 	40 	CFR
§501.lS(d) (3))
§11-62-54. 03 	Fact 	sheets. 	(a) 	The 	director
shall 	prepare 	a 	fact 	sheet 	for 	every draft 	individual
permit 	for 	a 	major 	facility, 	operation, 	or activity,
and when 	required by 40 	CFR 	§501.lS(d} (4).
(b) 	The 	director 	shall 	send 	the 	fact 	sheet 	to
the 	applicant 	and, 	upon 	request, 	to any other person.
(c} 	Fact 	sheets 	shall 	include 	at 	least 	the
information required by 40 	CFR 	§501.lS(d) (4) (i). 	[Eff
and comp 	12/ 09/04; 	comp 	MAR ?. 1 2016 	] 	(Auth: 	HRS
§§342D-4, 	342D-5, 	342D-6) 	(Imp: 1-m.s 	§§342D-2, 	342D-4,
342D-5, 	342D-6; 	40 	CFR 	Part 	501, 	40 	CFR 	§501.15{d) (4))
§11-62-54.04 	Public 	notices 	of 	draft 	individual
permits; 	public 	comments 	and hearing 	requests. 	(a)
The 	director 	shall 	notify the 	public 	that 	a 	draft
individual 	permit 	has 	been prepared and 	that 	the
public 	has 	thirty days 	to 	comment 	on 	it. 	The 	comment
period may be 	extended at 	the 	discretion of 	the
director. 	The 	director may 	require 	the permit
applicant 	to have 	the 	notice published.
(b) 	Methods. 	The 	director 	shall 	notify 	the
public 	by at 	least 	the methods 	specified 	in 40 	CFR
§501.15 (d) (5) (ii).
(c) 	Content. 	The public notice 	shall 	include 	at
least 	the 	information 	required by 	40 	CFR
501.15(d) (5) (iii) {A).
(d) 	Costs. 	All 	publication and mailing 	costs
associated with notifying 	the 	public 	of 	a 	draft 	permit
shall 	be paid by the 	permit 	applicant(s) 	to 	the
appropriate 	publishing 	agency or 	agencies 	determined
by the 	director. 	Failure 	to provide 	and pay 	for
public 	notice 	as 	required by 	the 	director 	is 	a 	basis
to 	deny 	issuance 	of 	a 	permit.
(e) 	Public 	comments 	and hearing 	requests.
During 	the public 	comment 	period, 	any person may
submit 	comments 	in writing 	and may 	ask 	in writing 	for
62-95
§11-62-54.04
a 	public hearing . 	A request 	for 	hearing 	shall 	state
the 	nature 	of 	the 	issues 	that 	the 	hearing should
cover. 	[Eff 	and 	comp 	12/09/04; 	comp
MAR 2 1 2016 	] 	(Auth: 	HRS 	§§342D-4, 	342D-5, 	342D-6,
3420-13} 	(Imp: 	HRS 	§§3420-2 , 	342D-4, 	342D-5, 	3420-6;
40 	CFR Part 	501, 	40 	CFR 	§501.15(d) (5), (6))
§11-62-54.05 	Public 	meetings 	or hearings 	on
individual 	permits. 	(a} 	The 	director 	shall 	hold a
public meeting 	or hearing 	if 	the 	director determines
that 	there 	is 	a 	significant 	degree 	of 	public 	interest
in 	a 	draft 	individual permit, 	based on hearing
requests.
(b) 	The 	director may hold 	a 	meeting or hearing
at 	the director ' s 	discretion, 	when 	such a 	meeting or
hearing may help 	the 	director's 	decision on an
individual 	permit 	application 	or 	for 	another reason
which the director 	considers 	to be 	in the 	public
interest. 	[Eff 	and 	comp 	12/09/04; 	comp
MAR 21 2016 	J 	(Auth : 	342D-4, 	3420-5 , 	342D-6)
(Imp: 	342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-57; 	40 	CFR
Part 	501, 	40 	CFR 	§501.15 (d) (7))
§11-62-54.06 	Public 	notice 	of public meetings 	or
hearings 	on 	individual permits . 	(a ) 	The 	director
shall 	notify the 	public 	that 	a 	meeting 	or hearing 	on
an 	individual 	permit matter 	has 	been 	scheduled. 	The
notice 	shall 	be 	given 	at 	least 	thirty days 	before 	the
hearing. 	The 	director may 	require 	the 	permit
applicant 	to have 	the 	notice 	published.
(b) 	Methods . 	The 	director 	shall 	notify 	[to] 	the
public by at 	least 	the methods 	specified 	in 40 	CFR
§501.15 (d} (5) (ii) .
(c) 	Content . 	The public 	notice 	shall 	include 	at
least 	the 	information 	required by 40 	CFR
§501.15 (d) (5) (iii).
(d) 	Costs. 	All 	publication and mailing 	costs
associated with notifying 	the 	public 	of 	a 	public
meeting or hearing 	shall 	be 	paid by the 	permit
applicant(s} 	to 	the 	appropriate 	publishing agency or
agencies 	determined by the 	director . 	Failure 	to
62-96
3176 	• !1 1
§11-62-54.08
provide 	and pay for public notice as 	required by the
director 	is 	a 	basis 	to deny issuance 	of a 	permit.
[Eff 	and comp 12/09/04; 	comp 	MAR 2.1 2016 	] 	(Auth:
HRS 	§§342D-4, 	342D-5, 	342D-6, 	342D-i3) 	(Imp: 	HRS
§§342D-2, 	342D-4, 	342D-5, 	342D-6; 	40 	CFR Part 	501, 	40
CFR §501.15 (d) (5))
§11-62-54.07 	Response 	to comments. 	When a 	final
individual 	permit 	is 	issued, 	the director 	shall 	issue
a 	written 	response 	to 	written 	comments 	as 	required by
40 	CFR 	§501.15(d) (8). 	[Eff and 	comp 	12/09/04; 	comp
MAR212016 	] 	(Auth: 	HRS 	§§342D-4, 	342D-5,
342D-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5, 	3420-6; 	40
CFR Part 	501, 	40 	CFR §501.lS(d) (8))
§11-62-54.08 	Issuance of 	individual permits;
duration, 	conditions. 	(a) 	Duration. 	The 	director
may issue 	an 	individual 	permit 	for 	any period not
exceeding 	five 	years, 	may renew such permit 	for 	any
additional 	periods 	not 	exceeding 	five 	years 	each, 	and
shall 	not 	modify an 	individual 	permit 	to 	extend 	its
maximum period.
(b) 	Each individual 	permit 	shall 	contain
conditions 	and 	requirements 	at 	least 	as 	stringent 	as:
(1) 	Those 	conditions 	contained in 40 	CFR
§501.15 (b);
(2) 	The 	wastewater 	sludge 	standards 	in
subchapter 	4;
(3) 	The 	treatment 	requirements 	in 	subchapter 2 ;
(4) 	The 	application rates 	in sections 	11-62-27;
(5) 	The 	standard permit 	conditions 	stated 	in
Appendix A entitled Wastewater Management
Individual 	Permit Standard Conditions 	dated
July 1, 	2014 , 	and located at 	the 	end of 	this
chapter; 	and
(6) 	Other 	requirements 	deemed necessary by the
director. 	[Eff 	and comp 12/09/04; 	comp
MAR 2 1 2016 	] 	(Auth : 	HRS
§ §342D-4, 	342D-5, 	342D-6) 	(Imp: 	HRS 	§ §342D-
2, 	342D-4, 	342D-5 , 	342D-6, 	3420-50 ; 	40 	CFR
Parts 	501, 	503, 	40 	CFR 	§§501 . 15 (a) (5) , (b) ,
62-97
317 6
1317 6 	,.
§11-62-54.09
503. 3 (a), 	503 . 10 (b) , (c) , 	503 .13, 	503. 32,
503.33)
§11-62-54 . 09 	Schedules of 	compliance.
Individual 	permits 	may 	contain schedules 	of 	compliance
that 	are 	at 	least 	as 	stringent 	as 	those 	allowed by 40
CFR 	§501.15{a). 	[Eff 	and comp 12/09/04; 	comp
MAR212016 	](Auth: 	HRS 	§§342D-4 1 	342D-5}
(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5 , 	342D-6, 	342D-50;
40 	CFR 	Part 	501, 	40 	CFR 	§501.15 (a) (6)}
§11-62-55.01 	REPEALED 	[R 	MAR 2 1 2016
§11-62-55.02 	REPEALED 	(R 	MAR 2 1 2016
§11-62-55.03 	Requiring 	an 	individual 	permit.
Cases 	where 	an 	individual 	permit may be 	required
include, 	but 	are 	not 	limited to 	the 	following:
(1) 	The 	wastewater 	system generates 	wastewater
sludge 	that 	is 	land applied; 	and
]
(2) 	Other 	relevant 	factors. 	[Eff 	and comp
12/09/04; 	am and comp 	]
(Auth: 	HRS 	§§342D-4, 	342D-5) 	{Imp: 	HRS
§§342D-2, 	342D-4, 	342D-S, 	342D-6, 	342D-50;
40 	CFR 	Part 	122, 	40 	CFR §122. 28 (b) (3) {i))
§11-62-55.04 	REPEALED 	[R MAR 2 1 2016
§11-62-55.05 	REPEALED 	[R MAR 2 I 2016
§11-62-55.06 	REPEALED 	[R 	MAR 2 1 2016
§11-62-55.07 	REPEAL ED 	[R MAR 2 1 2016
62-98
)
]
]
§11-62-55.08 	REPEALED 	[R
§11-62-57.02
MAR 2 1 2016
§11-62-56 	Standard permit 	conditions. 	Standard
permit 	conditions 	for 	individual permits 	are 	contained
in Appendix A entitled Wastewater Management
Individual 	Permit 	Standard Conditions 	dated
July 1, 	2014, 	and located at 	the end of 	this 	chapter.
[Eff 	and comp 12/09/04; 	am and 	comp
MAR 2 I Z016 	] 	(Auth: 	HRS 	§§342D-4, 	342D-5)
(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-50;
40 	CFR Part 	501, 	40 	CFR 	§501.15(b))
§11-62-57.01 	Transfer of permits. 	An 	individual
permit 	coverage may be 	transferred for 	the 	reasons 	and
under 	the 	procedures 	specified 	in 40 	CFR
§501.15(c) (1), 	which allows 	for 	transfers 	by
modification or automatically. 	[Eff 	and
comp 	12/09/04; 	am and comp 	MAR 2 I 2016 	(Auth:
HRS 	§§342D-4, 	342D-5) 	(Imp: 	HRS 	§§342D-2, 	342D-4,
342D-5, 	342D-6; 	40 	CFR Part 	501, 	§501.15(c) (1))
§11-62-57.02 	Modification or 	revocation 	and
reissuance 	of permits. 	(a) 	Each permit 	coverage
shall 	be 	subject 	to modification or revocation and
reissuance by the 	director 	after 	notice 	and
opportunity 	for 	a 	contested case hearing, 	except 	for
minor modifications.
(b) 	Individual permits may be 	modified, 	or
revoked and 	reissued, 	for 	the 	reasons 	specified 	in 	40
CFR §501.lS(c) (2) 	and 	section 342D-6(e), 	HRS, 	and 	the
director 	shall 	follow 	the 	procedures 	in 40 	CFR
§501.15 (c) (2) 	and 	(d) (2) 	and 	section 	342D-6 (e), 	HRS,
except 	for 	minor modifications, 	which 	shall 	follow 	the
procedures 	specified 	in Appendix A.
(c) 	All 	applications 	under 	section 	342D-7, 	HRS,
for 	a 	variance 	from 	the 	requirements 	of 	subchapter 	4
shall 	be 	treated as 	an application 	for 	a 	modification
under 	this 	section. 	Any variances, 	if 	granted, 	shall
be 	for 	a 	period not 	to 	exceed 	five 	years 	and may be
renewed upon application. 	(Eff 	and comp 	12/09/04; 	am
62-99
,:, 17 6
§11-62-57 . 03
and comp 	MAR 2 1 2016
342D-5, 	342D-6, 	342D-7)
342D-5, 	342D-6, 	342D-7,
§501.lS(c) (2), (d) (2))
] 	(Auth: 	HRS 	§§342D-4,
(I mp i 	HRS 	§§342D-2, 	342D-4,
342D-50; 	40 	CFR Part 	501,
§11-62-57.03 	Termination of 	~ ermits. 	(a) 	On
the 	expiration date 	specified 	in 	t ~ e 	individual
permit, 	the permit 	shall 	automatically terminate 	and
the 	permittee 	shall 	be 	divested 	of 	all 	rights 	therein.
(b) 	Each 	individual 	permit 	coverage 	shall 	be
subject 	to 	termination by 	the 	director 	after 	notice
and opportunity 	for 	a 	contested
case hearing.
(c) 	Individual 	permits 	may be 	terminated or
denied for 	any of 	the 	reasons 	specified 	in 	40 	CFR
§501 . 15(c) (3) 	and 	section 	342D-6(e), 	HRS, 	and under
the 	procedures 	specified 	in 40 	CFR 	§501.15(d) (2} 	and
section 342D-6 (e) , 	HRS. 	[Eff 	and 	comp 12/09/04; 	am
and am and comp 	MAR 2 1 2016 	] 	(Auth: 	HRS
§§342D-4, 	342D-5, 	342D-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4,
342D-5, 	342D-6, 	342D-50; 	40 	CFR 	Part 	501, 	40 	CFR
§§501.lS(c) (3), 	(d) (2))
§11-62-57.04 	Renewal 	of 	permits. 	{a)
Permittees 	seeking 	individual 	permit 	renewal 	shall
submit 	a 	renewal 	application at 	least 	one 	hundred
eighty days 	before 	the 	individual 	permit 	expires .
(b) 	An 	application 	for 	individual 	permit 	renewal
is 	subject 	to 	all 	of 	the 	requirements 	for 	an
application 	for 	a 	new permit , 	including a 	draft 	permit
and 	fact 	sheet, 	public 	notice , 	and 	a 	possible 	public
hearing, 	but 	excepting 	deadlines 	and 	fees 	specific to
new permits.
(c) 	The 	director may administratively extend the
existing permit 	pending 	the 	renewal 	of 	a 	wastewater
management 	permit.
{d) 	Individual permits 	may be 	renewed for 	the
reasons 	and 	under 	the 	procedures 	specified 	in 	sect i on
342D-6{c), 	HRS, 	and renewal 	may be 	denied 	for
noncompliance with the 	permit . 	[Eff 	and 	comp
12/09/04; 	am and comp 	MA R21 2016 	] 	(Auth : 	HRS
62-100
§11-62-61
§§3420-4, 	3420-5, 	3420-6) 	(Imp: 	HRS 	§§342D-2, 	342D-4,
342D-S, 	342D-6, 	3420-50; 	40 	CFR Part 	501, 	40 	CFR
§501.15 (b) (14))
§11-62-58 	Conflict 	of 	interest. 	(a) 	Any board
or body who 	reviews 	or approves 	applications 	for 	new,
modified, 	or renewed 	individual 	permits 	shall 	not
include 	as 	a 	member any person who 	receives, 	or 	has
during 	the 	previous 	two years 	received, 	a 	significant
portion of 	that 	person's 	income 	directly or 	indirectly
from permit 	holders 	or applicants 	for 	a 	permit.
(b) 	For 	this 	section 	the definitions 	of 	40 	CFR
§501.15(£) (1) 	shall 	apply. 	[Eff 	and 	comp 	12/09/04; 	am
and comp 	MtJRJ 1 ?nu; 	] 	(Auth: 	HRS 	§§3420-3,
342D-4, 	342D-5) 	(Im: 	AA~ §§342D-2, 	3420-3, 	342D-4,
342D-5; 	40 	CFR Part 	501, 	40 	CFR §501.15{f))
SUBCHAPTER 6
WASTEWATER AND WASTEWATER SLUDGE PUMPERS AND HAULERS
§11-62-60 	Applicability. 	This 	subchapter
applies 	to all 	persons 	who 	own or conduct 	operations
that 	haul 	or pump wastewater or wastewater 	sludge,
including 	septage 	and grease, 	and 	including cesspool
pumping 	firms 	(collectively 	11 pumpers 11 ). 	[Eff 	and 	comp
12/09/04; 	comp 	MAR 21 2016 	] 	(Auth: 	FRS 	§§342D-4,
3 420-5) 	{Imp: 	HRS 	§§3420-2, 	3420-4, 	3420-5, 	342D-50)
§11-62-61 	Registration requirements. 	In
addition 	to meeting 	the 	registration requirements 	of
sections 	11-62-50 (b) {4) 	and 11-62-53, 	each pumper
shall 	submit 	with 	its 	registration:
(1) 	A statement 	signed by the owner of 	the
wastewater 	and wastewater 	sludge pumping 	and
hauling 	firm 	attesting 	that:
(A} 	The 	owner has 	read, 	understands, 	and
62-101
317 6
131 7 6 1
/
§11-62-61
shall 	follow 	all 	applicable 	rules
regarding 	the 	collection, 	disposal,
monitoring, 	recordkeeping, 	and
reporting 	of pumping and hauling
wastewater 	and wastewater 	sludge,
including 	septage 	from 	individual
wastewater 	systems 	and other wastewater
systems; 	and
(B) 	The 	owner has 	and will 	continue 	to
provide 	employees 	of 	the pumping 	and
hauling 	firm with adequate training in
the 	proper pumping, 	collection,
hauling, 	and disposal 	of 	wastewater and
wastewater 	sludge;
(2) 	Copies 	of 	authorization 	to dispose of
wastewater 	and wastewater 	sludge 	into 	any
state , 	county, 	federal, 	or private 	facility
or 	site; 	and
(3) 	A 	statement 	signed by the 	owner of 	the
wastewater 	and wastewater 	sludge pumping and
hauling 	firm 	describing 	the 	firm's 	prior and
current 	involvement 	in the 	activity of
cesspool 	pumping. 	(Eff 	and comp 12/09/04;
comp 	MAR 2 1 2016 	] 	(Auth: 	HRS
§§342D-4, 	342D-5) 	(Imp : 	HRS 	§§342D-2, 	342D-
4, 	342D-5, 	342D-50)
§11-62-62 	Recordkeeping and 	reporting. 	In
addition 	to meeting 	the 	requirements of 	section 	ll-62-
53(c) 	and 	(d), 	each pumper 	shall 	maintain the
following 	types 	of 	records 	and information . 	Such
information 	shall 	be 	made 	available 	upon 	request 	to
any state, 	county, 	or 	federal 	wastewater 	agency
regulating or managing wastewater:
(1) 	Number 	of 	wastewater 	systems, 	including
individual 	wastewater 	systems 	and grease
traps 	pumped;
(2) 	Names 	of 	the 	owner of 	each wastewater 	system
and grease 	trap 	pumped;
(3) 	Location 	(street 	address 	or tax map key or
both) 	of 	each wastewater 	system and grease
trap pumped;
62-102
§11-62-71
(4)
(5)
( 6)
{ 7)
{ 8)
{9)
Date 	of 	pumping;
Type 	of 	wastewater or wastewater 	sludge
pumped;
Volume 	of 	wastewater or wastewater 	sludge
pumped;
Results 	of 	any 	test 	analyses 	performed on
the wastewater or wastewater 	sludge;
Disposal 	site 	of 	the pumped wastewater or
wastewater 	sludge; 	and
Date 	of 	such disposal. 	[Eff 	and comp ]	12/09/04; 	am and comp 	MAR 9. 1 2016
(Auth: 	HRS 	§§342D-4, 	342D-5Y 	rrmp: 	HRS
§§342D-2, 	342D-4, 	342D-5, 	342D-6, 	342D-50,
342D-55)
SUBCHAPTER 7
VARIANCES, 	PENALTIES , 	AND SEVERABILITY
§11-62-71 	Variances. 	{a) 	Variances 	and
variance 	applications 	shall 	comply with 	section
342D-7, 	HRS.
(b) 	Variance 	application forms 	shall 	be provided
by the 	department . 	All 	applications 	for variances
shall 	be 	submitted with a 	filing 	fee 	of 	$300 	for 	each
application. 	Additionally, 	the 	applicant 	shall 	pay
all 	fees 	assessed 	for 	publishing 	the 	legal 	notice(s)
for 	each variance 	application. 	If 	a 	public hearing 	is
required, 	the 	applicant 	shall 	pay all 	fees 	assessed
for 	publishing 	the 	public hearing notice(s).
(c) 	Applications 	for 	renewal 	of variances 	shall
be 	submitted one 	hundred eighty days 	before 	the
expiration of 	the 	variance 	on 	forms 	provided by 	the
department. 	A filing 	fee 	of 	$150 	shall 	be 	submitted
with each application 	for 	renewal. 	Additionally, 	the
applicant 	shall 	pay all 	fees 	assessed 	for ' publishing
the 	legal 	notice(s) 	and public hearing 	notice(s).
Failure 	to renew a 	variance 	within 	the 	specified 	time
will 	result 	in the 	termination of 	the 	variance 	and
62-103
317 6
,3176 	,I 1
§11-62-71
require 	the 	applicant 	to apply 	for 	a 	new variance .
[Eff 	12/10/88, 	am 	8/30/91; 	§11-62-41; 	ren, 	am and 	comp
12/09/04; 	comp 	MAR 21 2016 	] 	(Auth: 	HRS 	§§321-
11, 	342D-4, 	3420-5, 	342D-7, 	342D-13) 	(Imp: 	HRS 	§§321-
11, 	322-1 	to 	322-4, 	322-8, 	342D-2, 	342D-4, 	342D-
5,342D-7, 	342D-50)
§11-62-72 	Penalties 	and 	remedies. 	Any person
who 	violates 	any provision of 	this 	chapter 	shall 	be
subject 	to 	the 	penalties 	and remedies 	for 	violations
provided 	for 	in chapters 	321, 	322-part 	I, 	3420, 	and
342H, 	HRS. 	[Eff 	12/10/88; 	§11-62-42; 	ren, 	am and
comp 	12/09/04; 	comp 	MAR 21 2016 	] 	(Auth: 	HRS
§§321-11, 	322-8(a), 	342D-1, 	342D-4, 	342D-5, 	342D-9,
342D-11, 	342D-30, 	342D-31, 	342D- SO) 	(Imp: 	HRS 	§ §321-
11, 	322-1 	to 322-4, 	322-8, 	322-9, 	342D-2, 	342D-4,
342D-5, 	342D-9, 	342D-11, 	342D-18, 	342D-30, 	342D-31,
342D-50, 	603-23}
§11-62-73 	Severability. 	If 	any prov1s1on 	of
this 	chapter or 	its 	application 	to 	any person 	or
circumstance 	is 	held invalid, 	the 	application 	of 	such
provision 	to 	other persons 	or 	circumstances, 	and 	the
remainder of 	this 	chapter, 	shall 	not 	be 	affected
thereby. 	[Eff 	12/10/88; 	§11-62-43; 	ren and 	comp
12/09/04; 	comp 	MAR 21 2016 	] 	(Auth: 	HRS 	§§321-
11, 	342D-4, 	342D-5) 	(Imp: 	HRS 	§§321-11, 	322-1 	to 	322-
4, 	322-8, 	342D-2, 	342D-4, 	342D-19, 	342D-50)
§11-62-74 	Public participation 	in enforcement.
The 	department 	shall 	provide 	for 	public 	participation
in 	enforcement 	relating 	to violations 	of 	subchapters 	4
and 	5 	at 	least 	to 	the 	extent 	specified 	in 	40 	CFR
§501.17 (d) (2) . 	[Eff 	and comp 	12/09/04; 	comp
MAR212016 	] 	(Auth: 	HRS 	§§342D-4, 	342D-5)
(Imp: 	HRS 	§§342D-2, 	342D-4, 	342D-5, 	342D-50; 	40 	CFR
Part 	501, 	40 	CFR §501 . 17 (d) {2))
62-104
SUBCHAPTER 	8
FIELD CITATIONS
§11-62-82
§11-62-81 	Purpose. 	This 	subchapter authorizes
field 	citations 	to 	effectively and quickly settle
easily verifiable violations 	of 	chapters 	322 	and 	342D,
HRS, 	and 	this 	chapter. 	Settlements under 	this 	section
are 	an additional 	remedy and do not 	supplant 	the
director's 	authority 	to issue 	orders under 	section
342D-9, 	HRS. 	[Eff 	and comp 	12/09/04; 	comp
MAR 21 2016 	l 	(Auth: 	HRS 	§§321-11, 	322-8 (a),
342D-l, 	342D-4, 	342D-5, 	and 342D-31) 	( Imp: 	HRS 	§§321-
11, 	322-1 	to 	4, 	322-8, 	342D-2, 	342D-4, 	342D-5, 	342D-9,
342D-18, 	342D-31, 	342D-50)
§11-62-82 	Offer 	to 	settle; 	settlement 	amounts.
(a) 	A field 	citation 	is 	an offer to 	settle an
administrative 	case 	against 	a 	specific violation on a
specific 	day. 	Instead of 	issuing a 	formal 	notice 	and
finding 	of 	violation 	and order, 	the 	director, 	in 	the
director 1 s 	sole 	discretion, 	through any authorized
employee, 	may 	issue 	a 	field 	citation by personal
service 	or certified mail 	to:
(1) 	Any person 	or owner who causes 	or 	allows 	a
wastewater 	system to create 	or 	contribute 	to
a 	wastewater spill, 	overflow, 	or discharge
onto 	the 	ground or 	into 	surface waters, 	in
violation of 	section 	11-62-06(£) (5} 	or 	(6);
(2} 	Any person or owner who uses 	or occupies 	a
building not 	connected to 	a 	wastewater
system 	in violation of 	section 11-62-06(a};
(3) 	Any person or owner who 	constructs,
modifies, 	or uses 	any 	individual 	wastewater
system without 	approval 	by the 	director or a
county authorized by the director 	to approve
and 	regulate 	individual 	wastewater 	systems,
in violation of 	section 	ll-62-08(b} 	or 11-
6 2 - 31. 1 ( f ) ; 	or
62-105
317 6
§11-62-82
(4) 	Any person 	or 	owner who does 	not 	respond
within 	thirty days 	to an operation 	and
maintenance 	inspection 	report 	issued by the
Department.
(b) 	A field 	citation 	shall 	indicate 	the
following 	settlement 	amounts:
(1) 	$200 	for 	a 	first 	violation, 	and 	$500 	for a
subsequent 	violation 	for:
(A) 	Violating 	sections 	11-62-06(a), (fl (1)-
(4) 	and 	(fl (6) - (9 ) , 	11-62-08 (bl 	or 	11-
62-31.1 (fl ;
(B) 	Failing properly 	to operate 	or maintain
an aerobic 	treatment 	unit;
(C} 	Failing 	to 	provide 	an 	effective
contract 	for 	an aerobic 	treatment 	unit;
(D) 	Failing 	to 	respond 	to department
inspection 	reports , 	if 	the 	report
states 	a 	response 	is 	required;
(E) 	Having a 	cesspool 	without 	a 	concrete
cover;
(F) 	Not 	having 	a 	secured manhole 	cover 	for
the 	cesspool; 	or
(G} 	A collapsed 	cesspool .
(2) 	$500 	for 	a 	first 	violation, 	and 	$2,000 	for
a 	subsequent 	violation 	for violating 	section
11-62-06(£) (5) 	or 	(10); 	and
(3) 	$1,000 	for 	a 	first 	violation, 	and 	$2 , 500
for 	a 	subsequent 	violation 	for 	constructing
an 	individual 	wastewater 	system without
department 	approval 	to 	construct . 	[Eff 	and
comp 12/09/04; 	am 	and comp 	MAR 21 2016 	J
{Auth: 	HRS 	§§321-11, 	322-8(a), 	342D-l,
342D-4, 	342D-5, 	342D-9, 	342D-11, 	342D-30,
342D-31, 	342D-50) 	(Imp : 	HRS 	§§321-11 ,
322-1 	to 	4, 	322-8, 	342D-2 , 	342D-4, 	342D-5,
342D-9, 	342D-11 , 	342D-18, 	342D-30, 	342D-31,
342D-SOl
6 2 -106
§11-62-83
§11-62-83 	Resolution of 	field 	citation. 	(a) 	A
person 	issued a 	field 	citation may accept 	the 	citation
by:
(1) 	Signing 	the 	field 	citation;
(2) 	Paying 	the 	full 	amount 	indicated by the
field 	citation. 	Payment 	shall 	be 	made
payable 	to 	the 	"State 	of 	Hawaii 11 	by check,
cashier's 	check, 	money order or as 	otherwise
specified by the director;
(3) 	Mailing or delivering 	the 	signed citation
and 	full 	payment 	to 	the 	wastewater branch 	in
Honolulu, 	or 	the district 	health office 	for
the 	county where 	the 	violation occurred.
The 	department 	must 	receive the 	signed 	filed
citation and full 	payment 	within 	twenty days
after the 	person 	receives 	the 	field
citation; 	and
(4) 	Correction within 	seven days 	or unless
otherwise 	specified on 	the 	field 	citation
any violation of 	section 11-62-06 (f) (6).
(b) 	By signing 	the 	field 	citation, 	the person 	to
whom 	it 	was 	issued agrees 	to:
(1) 	Give up 	the 	person's 	right 	to a 	contested
case hearing under 	chapter 	91 	or 342D, 	HRS,
or 	otherwise 	challenge 	the 	field 	citation;
(2) 	Pay the 	amount 	indicated; 	and
(3) 	Correct 	the 	violation.
(c) 	If 	the 	field 	citation 	is not accepted in
compliance 	with 	subsection 	(a), 	the 	director may 	seek
for 	that 	cited violation any remedies 	available 	under
this 	chapter, 	chapters 	321, 	322, 	342D, 	HRS, 	or 	any
other 	applicable 	law. 	For 	all 	other violations 	the
director 	retains 	authority 	to 	seek any available
remedies . 	[Eff 	and comp 12/09/04; 	am and comp
MAR 21 2016 	l 	(Auth: 	HRS 	§§321-11, 	322-
8 (a), 	342D-r, 	342D-4, 	342D-5, 	342D-9, 	342D-11, 	342D-
3 0 , 	3 4 2 D- 3 1 , 	3 4 2 D- 5 0 ) 	( I mp : 	HRS 	§ § 3 21-11 , 	3 2 2 -1 	to 	4 ,
322-8, 	322-9, 	342D-2, 	342D-4, 	342D-5, 	342D-9, 	342D-11,
342D-18, 	342D-30, 	342D-31, 	342D-50, 	603-23)
62-107
317 6
' '
§11-62-84
§11-62-84 	Form 	of 	citation. 	The 	department
shall 	prescribe 	a 	field 	citation form." 	[Eff 	and comp
12/09/04; 	am and 	comp 	MAR 21 2016 	] 	(Auth:
HRS 	§§321-11, 	322-8 (a), 	342D-1, 	342D-4, 	342D-5) 	(Imp:
HRS 	§§321-11, 	322-1 	to 	4, 	322-8, 	342D-2, 	342D-4, 	3420-
5, 	342D-9, 	342D-18, 	342D-31, 	342D-50)
62-108
CHAPTER 11-62 	APPENDIX A
INDIVIDUAL PERMIT
STANDARD CONDITIONS
July 1, 	2014
Appendix A, 	Individual 	standard conditions
1. 	Duty to 	comply
2. 	Compliance with sludge 	standards
3. 	Compliance with wastewater effluent 	standards
4. 	Compliance with water quality standards
5. 	Clean Water Act 	(CWA) 	penalties
6. 	Signatory and certification requirement
7. 	Duty to 	reapply
8. 	Need to 	halt 	or 	reduce 	activity not 	a 	defense
9. 	Duty to 	mitigate
10. 	Proper operation and maintenance
11. 	Permit 	actions
12. 	Property rights
13. 	Duty to 	provide 	information
14. 	Inspection and entry
15. 	Sampling 	requirements 	and definitions
16. 	Monitoring 	and recordkeeping
17. 	Notice 	requirements
18. 	Reopener 	clause
19. 	Transfers 	by modification
20. 	Automatic 	transfers
21. 	Minor modification of permits
22. 	Modification or 	revocation and 	reissuance 	of
permits
23. 	Termination of permits
24. 	Availability of 	reports
25. 	Civil 	and criminal 	liability
26. 	State 	law
27. 	Severability
The 	following 	conditions 	apply to ind i v i dual 	permits
unless 	otherwise 	specified . 	"Perm i ttee" 	refers 	to 	a
person to whom an 	individual 	permit 	has 	been 	issued .
62-A-1
3176
3176 	• d '
CHAPTER 11-62 	APPENDIX A
1. 	Duty to comply . 	Permittees 	shall 	comply with and
are 	subject 	to 	§11-62-0G(q).
2. 	Compliance with sludge 	standards. 	Permittees
shall 	comply with HAR chapter 	11 - 62, 	subchapter
4.
3. 	Compliance with wastewater effluent 	standards.
Permittees 	t reating wastewater 	shall 	comply with
§11-62-26 	a nd, 	if 	applicable, 	§11-26-27.
4. 	Compliance with water quality standards.
Permittees 	shall not 	cause or 	contribute 	to 	any
violation O·f 	applicable 	sections 	of 	HAR chapter
11-54 .
5. 	Clean Water Act 	(CWA) 	penalties. 	The monetary
fines 	and 	imprisonment 	terms 	referred 	to 	in 	40
CFR §§501.15(b) (3), 	on CWA 	§309;
501.15 (b) (11) (ii}, 	on 	false 	statement,
representation, 	or 	certification; 	and
§501.lS(b) (10), 	on 	falsification, 	tampering with,
or rendering 	inaccurate any monitoring device 	or
method; 	all 	apply, 	in addition 	to any state
penalties.
6. 	Signatory and certification requirements. 	Each
permit 	application, 	report, 	notice, 	and any
information 	submitted to 	the director 	shall 	be
signed and certified as 	required by §11-62-52 .
7. 	Duty to 	reapply. 	Permittees 	shall 	comply wit h
§11-62-57.04.
8. 	Need to halt or reduce 	activity not a 	defense.
It 	shall 	not 	be 	a 	defense 	for 	a 	permittee 	in an
enforcement 	action 	that 	it would have been
necessary to 	halt 	or reduce 	the 	permitted
activity in order 	to maintain compliance 	with the
conditions 	of 	this 	permit.
62-A-2
CHAPTER 11-62 	APPENDIX A
9. 	Duty to mitigate. 	Permittees 	shall comply 	with
§11-62-06(j) .
10. 	Proper operation and maintenance. 	Perrnittees
shall 	comply with §11-62-06(e) .
11. 	Permit actions. 	This 	permit 	may be modified,
revoked 	and 	reissued , 	or 	terminated 	for 	cause.
The 	filing 	of 	a 	request 	by 	the 	permittee 	for 	a
permit modification, 	revocation 	and 	reissuance,
or 	termination, 	or 	a 	notification 	of planned
changes 	or 	anticipated noncompliance does 	not
stay 	any 	permit 	condition.
12. 	Property rights. 	This 	permit 	does 	not 	convey 	any
property 	rights 	of 	any sort, 	or 	any exclusive
privilege.
13. 	Duty to provide information . 	The 	permittee 	shall
furnish 	to 	the director, 	within 	a 	reasonable
time, 	any 	information 	which 	the director may
request 	to determine whether 	cause 	exists 	for
modifying, 	revoking 	and 	reissuing, 	or 	terminating
this 	permit 	or 	to determine 	compliance with 	this
permit. 	The permittee 	shall 	also 	furnish 	to 	the
director, 	upon 	request, 	copies 	of 	records
required 	to 	be 	kept by this 	permit.
14 . 	Inspection and entry. 	The permittee 	shall 	allow
the director , 	or an 	authorized 	representative,
upon 	the 	presentation 	of 	credentials 	and other
documents 	as 	may be 	required 	by 	law, 	to:
a. 	Enter 	upon 	the 	permittee's premises 	where 	a
regulated 	facility 	or 	activity 	is 	located or
conducted, 	or 	where 	records 	must 	be 	kept
under 	the 	conditions 	of 	this 	permit;
b. 	Have 	access 	to 	and 	copy, 	at 	reasonable
times, 	any 	records 	that 	must 	be 	kept 	under
the 	conditions 	of 	this 	permit;
62-A-3
~176
CHAPTER 11-62 	APPENDIX A
c . 	I nspect 	at 	reasonable 	times 	any 	facility,
equipme n t 	(including monitoring 	and control
equipment), 	practices , 	or 	operations
regulated or 	required under 	this 	permit ; 	and
d . 	Sample 	o r 	mo nitor 	at 	reasonable 	times, 	for
the 	purposes 	of assuring 	permit 	compliance
or 	as 	otherwise 	auth o rized by the 	Clean
Water Act , 	any 	substances , 	parameters , 	or
practices 	at 	any 	l o cati o n.
15. 	Sampling requirements.
a . 	Sampling 	points. 	All 	samples 	shall 	be 	taken
at 	the monitoring points 	specified 	i n 	this
permit a nd , 	unless 	otherwise 	specif i ed ,
before 	final 	use, 	disposal, 	or discharge.
Mon~toring points 	shall 	not 	be 	changed
wit h out 	notification 	t o 	and 	the 	approval 	of
the 	director. 	No 	use, 	disposal , 	or
disc h arge 	is 	authorized which does 	not
to tally pass 	through 	the 	final 	monitorin g
point.
b. 	Calibration . 	The 	permittee 	shall
periodically 	calibrate and 	perform
maintenance 	on 	al l 	monitoring an d 	analytical
equip ment used 	to 	monitor 	the pol l utants,
sludge, 	and 	other 	items 	spe ci fi e d 	by 	the
director under 	this 	permit, 	at 	intervals
which wi ll 	ensure 	the 	accuracy of
measurements, 	but 	no 	less 	than 	the
manufacturer's 	recommended 	intervals 	or 	one
year 	intervals 	(whichever 	comes 	first).
[Records 	of c a li b r a ti o n 	shall be 	kept
pursuant 	to 	section 	13(b) 	of 	this 	ge n era l
permit . ]
16. 	Monitoring and recordkeeping.
a . 	Mo ni t oring res u lts 	shall 	be 	reported 	a t 	a
frequency 	specified here or 	else where 	in 	th e
62- A-4
CHAPTER 11-62 	APPENDIX A
permit, 	whichever 	is 	greater. 	The 	frequency
of 	sampling 	shall 	be dependent 	on 	the 	size
of 	the wastewater 	system, 	nature 	and effect
of 	the wastewater, 	reclaimed water, 	and
wastewater 	sludge 	use 	and disposal
practices. 	At a 	minimum, 	the 	frequency
shall 	be 	as 	required by 	§§11-62-26(a), 	11-
62-26(c) , 	11-62-28(a), 	and 	subchapter 	4.
b . 	Representative 	sampling. 	Samples 	and
measurements 	taken 	for 	the purpose 	of
monitoring 	shall 	be 	representative 	of 	the
monitored 	activities 	listed 	in 	§§11-62-
26(a), 	11-62-26(c), 	11-62-28(a) , 	and
subchapter 	4.
As 	used 	in 	this 	section, 	a 	representative
sample means 	that 	the 	content 	of 	the 	sample
shall 	(1) 	be 	identical 	to 	the 	c o ntent 	of 	the
substance 	sampled 	at 	the 	time of 	the
sampling; 	(2) 	accurately 	represent 	the
monitored 	item 	(for 	example, 	sampling 	to
monitor 	final 	effluent 	quality shall
accurately 	represent 	that 	quality, 	even
though 	the 	sampling 	is 	done 	upstream of 	the
discharge 	point); 	and 	(3) 	accurately
represent 	the monitored 	item 	for 	the
monitored 	time 	period 	(for example, 	sampling
to 	represent monthly average 	effluent 	flows
shall 	be 	taken at 	times 	and 	on days 	that
cover 	significant 	variations ).
Representative 	sampling 	may mean 	including
weekends 	and 	storms 	and may mean 	taking more
samples 	than 	the 	minimum number 	specified
elsewhere 	in 	the 	permit. 	The burden 	of
proving 	that 	sampling 	or monitoring 	is
representative 	shall 	be 	on the 	permittee.
c . 	Record 	retention. 	The 	permittee 	shall
retain 	records of 	all monitoring
information, 	including 	all 	ca l ibratio n 	and
maintenance 	records 	and 	all 	original 	strip
62-A-5
~176
CHAPTER 11-62 	APPENDIX A
chart 	re cordings 	for 	continuous monitoring
instrumentation , 	copie s 	of 	all 	reports
required by 	this 	permit, 	and 	records 	of 	all
data 	used 	to 	complete 	the 	application 	for
this 	permit, 	for 	a 	period o f 	at 	least 	five
(5) 	years 	from 	the 	date 	of 	the 	sample,
measurement , 	report 	or 	app l i c at i on. 	This
period may b e 	extended 	by 	r equest 	of 	the
direct o r 	o f 	health 	at 	any 	time.
d . 	Records ' 	co n tent. 	Records 	of monitoring
informati o n 	shal l 	include:
(1) 	The 	date, 	exact 	place, 	and time 	of
samp l ing 	or measurements;
{ 2) 	The 	name 	of 	individual(s} 	who performed
the 	sampling 	or measurements;
(3) 	The 	date ( s) 	analyses were performed;
(4) 	The 	n ame 	of 	individual{s) 	who performed
the 	analyses;
(5) 	Th e 	analytical 	techniques 	or methods
use d 	and 	if available, 	references 	and
written 	procedures 	for 	these 	techniques
or methods; 	and
(6) 	The 	res u lts 	of 	such 	analyses, 	including
be n ch 	sheets, 	instrument 	read o uts,
etc., 	used 	to 	determine 	these 	results.
e. 	Monit o ring procedures. 	Unless 	other
proce du res 	have been 	spe c ifie d 	in 	this
permit, 	monitor i ng 	shall 	be 	c o nducted
according 	to 	tes t 	procedures 	approved 	under
40 	CFR 	Pa r t 	136 or, 	i n 	the 	case of 	sludge
use 	or disposal, 	approved under 	40 CFR 	P~ r t
503.
17. 	Notice requirements .
31 7 6 1 ~I ◄
a . 	Planned 	changes . 	The permittee 	shall 	give
notice 	to 	the 	director 	as 	soon as 	possible
of 	any planned physi c al 	alterations 	or
addit i ons 	to 	the 	permitted 	facility, 	or
significant 	c hange s 	pl a nne d 	in the
62 - A-6
CHAPTER 11-62 	APPENDIX A
permittee's 	sludge 	use 	or disposal 	practice,
where 	such 	alterations, 	additions, 	or
changes may 	justify 	the 	application 	of
permit 	conditions 	that 	are different 	from or
absent 	in 	the 	existing 	permit, 	including
notification 	of 	additional disposal 	sites
not 	reported during 	the 	permit 	application
process 	or 	not 	reported 	pursuant 	to an
approved 	land application plan .
b. 	Anticipated 	noncompliance. 	The permittee
shall 	give 	advance 	notice 	to 	the 	director 	of
any planned 	changes 	in 	the 	permitted
facility 	or 	activity 	which may 	result 	in
noncompliance 	with 	permit 	requirements.
c . 	Transfers . 	This 	permit 	is 	not 	transferable
to 	any person 	except 	after notice 	to 	the
director. 	The director may 	require
modification 	or 	revocation 	and 	reissuance 	of
the 	permit 	to change 	the name 	of 	the
permittee 	and 	incorporate 	such other
requirements 	as may 	be 	necessary under 	the
CWA.
d. 	Other noncompliance 	reporting. 	The
permittee 	shall 	report 	all 	instances 	of
noncompliance . 	Reports 	of noncompliance
shall 	if applicable 	follow 	the 	spill
protocol 	of 	appendix 	C otherwise 	shall 	be
submitted with 	the 	permittee's ne x t 	self
monitoring 	report 	or 	earlier 	if 	requested by
the 	director 	or 	if 	required by 	an 	applicable
standard 	for 	wastewater 	sludge use 	or
disposal 	or 	condition 	of 	this 	permit.
e. 	Other 	information. 	Where 	the 	permittee
becomes 	aware 	that 	it 	failed 	to 	submit 	any
relevant 	facts 	in 	a 	permit 	application, 	or
submitted 	incorrect 	information 	in 	a 	permit
application 	or 	in 	any 	report 	to 	the
62-A-7
~176
CHAPTER 11 -62 	APPENDIX A
director, 	it 	shall 	promptly submit such
facts 	or 	information.
18. 	Reopener 	cl au se .
; l
J
a. 	If 	the standards 	for 	wastewater 	and
wastewater 	sludge 	applicable 	to 	the
permittee 1 s 	use, 	disposal, 	or discharge
method are promulgated 	under 	the 	Clea n 	Water
Act, 	the 	Hawaii 	Revised 	Statutes, 	or 	the
Hawaii Administrative 	Rules 	before 	the
expiration date of 	this 	permit , 	and those
standards 	are more 	stringent 	than 	the
wastewater 	or 	wastewater 	sludge pollutant
limits 	or 	acceptable management practices
authorized 	in 	this 	permit, 	or controls 	a
pollutant 	or practice 	not 	l imited 	in 	this
permit, 	this 	permit 	may be 	promptly modified
or 	revoked 	and 	reissued 	to conform to 	the
standards 	for 	wastewater 	or wastewater
sludge use, 	disposal, 	or discharge by no
later than 	the 	compliance deadline 	specified
in 	the 	regulat i ons 	establishing 	those
standards, 	whether 	or 	not 	this 	permit 	has
been modified 	or 	revoked 	a nd 	reissued.
b. 	This permit 	shall 	be modified or 	revoked and
reissued 	at 	any time 	if, 	o n 	the 	basis 	of any
new data, 	the director 	determines 	that
continued wastewater 	or 	wastewater 	sludge
use, 	disposa l , 	or 	discharge may cause
unreasona b le 	degradation 	of 	the 	environment.
c. 	The permittee 	shall 	comply with 	new
standards 	for 	wastewater 	sludge 	use 	or
disposal 	adopted 	in 	40 	CFR 503 	during 	the
term of 	the 	permit, 	if 	they are more
stringent 	than the 	terms 	of 	the 	permit 	and
chapter 	11 -62, 	even 	if 	this 	permit 	has 	not
yet been 	modified 	to 	i n corporate 	the
standa r ds.
62-A-8
CHAPTER 11-62 	APPENDIX A
19. 	Transfers by modification. 	Except 	as 	provided 	in
condition 	20 	of these 	standard 	conditions, 	a
permit may be 	transferred 	by 	the 	permittee 	to 	a
new owner 	or 	operator 	only 	if 	the 	permit 	has been
modified 	or 	revoked and 	reissued 	to 	identify 	the
new permittee and 	incorporate such other
requirements 	as may be 	necessary 	to 	assure
compliance with 	the CWA .
20. 	Automatic transfers. 	As 	an 	alternative 	to
transfers under 	condition 	19 of 	these 	standard
conditions , 	the director may 	authorize 	automatic
transfer 	of 	any permit 	issued under 	this 	rule 	to
a 	new permittee 	if :
a. 	The 	current permittee 	notifies 	the 	director
at 	least 	30 	days 	in 	advance 	of 	the 	proposed
transfer date 	in 	condition 	20 . c. 	of 	these
standard conditions;
b. 	The 	notice 	includes 	a 	written 	agreement
between 	the existing 	and new permittee
containing a 	specific 	date 	for 	transfer of
permit 	responsibility, 	coverage, 	and
liability between 	them; 	and
c . 	The director 	does 	not 	notify 	the 	existing
permittee and 	the 	proposed 	new 	perrnittee 	of
the director's 	intent 	to modify or 	revoke
and 	reissue 	the 	permit. 	If 	this 	notice 	is
not 	received, 	the 	transfer 	is 	effective on
the 	date 	specified 	in 	the 	agreement 	of
condition 	20 . b 	of 	these 	standard 	conditions.
21. 	Minor modification of permits . 	Upon 	the 	consent
of 	the 	permittee, 	the director may modify 	a
permit 	to make 	the 	corrections 	or 	allowances 	for
changes 	in 	the 	permitted 	activity 	listed 	in 	this
section without 	following 	the procedures 	of 	§11-
62-57 . 02. 	Any permit modification 	not 	processed
as 	a 	minor modification 	under 	this 	section must
be 	made 	for 	cause 	and with 	draft 	permit and
62-A-9
3176
CHAPTER 11-62 	APPENDIX A
public 	notice 	as 	required. 	Minor modifications
may 	only:
a. 	Correct 	typographical 	errors;
b. 	Require more 	frequent 	monitoring 	or
reporting by 	the 	permittee;
c. 	Change 	an 	interim compliance 	date 	in 	a
schedule 	of compliance, 	provided 	the 	new
date 	is 	not more 	than 	120 days 	after 	the
date 	specified 	in 	the 	existing permit 	and
does 	not 	interfere 	with 	attainment 	of 	the
final 	compliance 	date 	requirement; 	and
d. 	Allow 	for 	a 	change 	in 	ownership or
operational 	control 	of 	a 	facility 	where 	the
director 	determines 	that 	no other 	change 	in
the 	permit 	is 	necessary, 	provided 	that 	a
written 	agreement 	containing a 	specific 	date
for 	transfer 	of permit 	responsibility,
coverage, 	and 	liability between 	the 	current
and new 	permittee 	has 	been submitted 	to 	the
director .
22 . 	Modification or revocation and reissuance of
permits. 	Permittees 	sha l l 	comply with 	and 	are
subject 	to §11-62-57.02, 	except 	for 	minor
modifications.
23 . 	Termination of permits . 	Perrnittees 	are 	subjec t
to 	§11-62-57 . 03 	and general 	permittees 	are 	als o
subject 	to 	§11-62-55.03.
24 . 	Availability of reports. 	Except 	for 	data
determined 	to be 	confidential 	under 	HRS 	§3420-14,
all 	reports 	prepared 	in 	accordance 	with 	the 	terms
of 	this 	permit 	shall 	be 	available 	for 	public
inspection 	at 	the 	offices 	of 	the 	director. 	As
required by 	this 	rule, 	permit 	applications,
permits, 	and effluent 	and wastewater 	sludge da ta
shall 	not be 	considered 	confidential .
62-A-10
317 6 	114
CHAPTER 11-62 	APPENDIX A
25. 	Civi1 and crimi.na1 1iabi1ity. 	Nothing 	in 	this
permit 	shall 	be 	construed 	to 	relieve 	the
permittee 	from 	civil 	or 	criminal 	penalties 	for
noncompliance.
26 . 	State 1aw . 	Nothing 	in 	this 	permit 	shall 	be
constructed 	to 	preclude 	the 	institution 	of 	any
legal 	action 	or 	relieve 	the 	permittee 	from 	any
responsibilities, 	liabilities, 	or penalties
established pursuant 	to 	any 	applicable 	state 	law
or 	regulation .
27. 	Severabi1ity. 	The 	provisions 	of 	this 	permit 	are
severable , 	and 	if 	any provision 	of 	this 	permit,
or 	the 	application 	of 	any 	provision 	of 	this
permit 	to 	any 	circumstance, 	if held invalid, 	the
application 	of 	such provision 	to 	other
circumstances , 	and 	remainder 	of this 	permit,
shall 	not be 	affected thereby .
62-A-ll
317E
CHAPTER 11-62 	APPENDIX B
RESPONSES FOR WASTEWATER
SPILLS, 	OVERFLOWS, 	AND DISCHARGES
( "SPILLS 11 )
Ju ly 	1, 	2014
Table 	of 	contents
1. 	Points 	of 	contact
2 . 	Spills 	into 	state waters, 	excluding 	R-1 	water
from 	recycled water 	systems
3. 	Spills 	into 	state waters 	of 	R-1 	water 	from
recycled water 	system
4. 	Sp i lls 	to ground only - 	with 	public 	access
5. 	Spills 	to ground only - 	with 	no public 	access
6 . 	Spills 	to 	ground only - 	R-1 	and RO water only
7. 	Press 	release
8. 	Mo n itoring of 	state water
9. 	Reporting
10. 	Modifications 	by the 	director
62-B-l
f~176 	, f
CHAPTER 11-62 	APPENDIX B
1. 	Points 	of contact
Agency 	Phone 	Fax
Clean Water 	Branch 	(CWB)
Wastewater 	Branch 	(WWB)
586-4309
586-4294
586-4352
586-4352
Environmental 	Health 	Programs
Hawaii 	District 	Health Office
Kauai 	District 	Health Office
Maui 	District 	Health Office
(EHP)
933-4371
241-3323
984-8234
State 	Hospital 	Operator 	(SHO) 	247-2191
Communications 	Office
933-4669
241-3480
984-8237
586-4444
2. 	Spills 	from any facility into 	state waters,
excluding R-1 water from recycled water systems
a . 	Applicability . 	Any wastewater 	spill 	which
enters 	into 	state 	waters 	from 	a 	public 	or
private 	wastewater 	system.
(1) 	"State waters" 	has 	the meaning 	defined
in 	HRS 	section 	341-D, 	and 	includes
drainage 	ditches, 	whether or 	not 	water
is 	always 	fl o wing 	in them.
(2) 	Exclusion . 	Spill 	of R-1 	water 	covered
by Appendix 	J 	to 	HAR chapter 	11-5,
"NPDES 	General 	Permit Authorizing
Discharges 	of 	R-1 	Water 	from 	Recycled
Water Systems". 	That 	general 	permit
does 	not 	cover 	spills 	from 	treatment
works.
b. 	Immediate 	notice 	to 	DOH. 	If 	a 	spill 	occurs
during working hours:
(1) 	The 	wastewater 	system owner 	or 	its
agent 	(owner/agent) 	shall 	immediately
notify the CWB 	of 	any 	spill 	into 	state
waters; 	and
(2) 	If 	a 	spill 	occurs 	on 	the 	neighbor
islands, 	the 	owner/agent 	shall 	also
immediately notify 	their 	respective
62-B-2
3176
If 	a
( 1)
( 2)
CHAPTER 11-62 	APPENDIX B
district 	environmental 	health program
chief,
spill 	occurs 	during 	non-working 	hours:
Contact 	the 	state 	hospital 	operator;
and
The next working 	day 	notify 	the CWB 	and
the 	respective 	district 	EHP chief 	with
a 	fol l ow-up call.
c . 	Press 	Release. 	The 	owner/agent 	shall
immediately send out 	a 	press 	release 	for
spills 	of a 	thousand gallons 	or more 	and 	for
lesser 	spills 	if 	they 	present a 	substantial
threat 	to 	public 	health. 	A press 	release
shall comply with 	section 	7. 	A press
release 	is 	not 	required 	if 	the owner/agen t
demonstrates 	that 	the 	spill 	was 	of R-1 	water
and 	that 	BMPs 	as 	approved by 	the director
were 	implemented.
d . 	Disinfection. 	The 	owner/agent 	shall
disinfect wastewater which 	is 	continuously
being 	spilled 	into 	nearshore 	waters 	if
sufficient disinfection 	contact time 	is
available. 	Best 	judgment 	should be 	used 	in
determining the 	amount 	of 	chlorine added 	to
the discharge 	if 	chlorine 	is 	used 	as 	a
disinfectant. 	Disinfection 	is 	not 	required
if 	the 	ow n er / agent 	demonstrates 	that 	the
spill 	was 	either 	R-1 	or 	R-2 	water 	and 	that
BMPs 	as 	approved by 	the 	director 	were
implemented.
e . 	Warning 	signs. 	The 	owner/agent 	shall
immedia t ely post 	warning 	signs 	in 	the
area(s) 	likely 	to 	be affected by 	the 	spill
and where 	public 	access 	is 	possible.
Posting 	of warning 	signs 	is 	not 	required if
the 	owner/agent 	demonstrates 	that 	the 	spill
was 	of R-1 	water 	and 	that 	BMPs 	as 	approved
by 	the 	director were 	implemented.
62-B-3
CHAPTER 11-62 	APPENDIX B
The 	director 	shall 	also 	assure 	that 	a
sufficient 	number 	of warning 	signs 	have 	been
posted 	and 	the 	locations 	are 	adequate.
Authorization 	to 	remove 	the 	signs 	shall 	also
come 	from 	the 	director.
f . 	Monitoring. 	The owner/agent 	shall 	conduct
bacterial monitoring 	for 	any 	spill 	greater
than 	100 gallons 	or when 	public 	health 	may
be 	threatened 	in accordance with 	section 	8.
Monitoring 	is 	not 	required 	if 	the
owner/agent demonstrates 	that 	the 	spill 	was
R-1 	water 	and 	that 	BMPs 	as 	approved by 	the
director 	were 	implemented.
g, 	Reporting . 	The owner/agent 	shall 	report 	to
the CWB 	under 	section 	9.a.
3 , 	Spills 	into 	state waters of R-1 water from
recycled wate~ systems
a . 	Applicability. 	Any spills 	of R-1 	water
covered by Appendix 	J 	t o 	HAR 	chapter 	11-55,
"NPDES 	General 	Permit Auth o rizing 	Discharges
of 	R-1 	Water 	from 	Recycled Water 	Systems."
(1) 	"State 	waters" 	has 	the 	same meaning
defined 	in 	HRS 	secti o n 	3420-1, 	and
includes 	drainage 	ditches, 	whether 	or
not 	water 	is 	always 	fl o wing 	in 	them.
(2) 	Exclusion . 	The 	general 	permit does 	not
cover 	spills 	fr om treatment works.
b . 	Requirements. 	Among 	other 	things, 	the
general 	permit 	requires 	filing 	a 	Notice 	of
Intent 	before 	any discharge, 	compliance 	with
standard 	conditions 	in 	appendix A of 	chapter
11-55, 	implementation of best management
practices 	(BMPs), 	monitoring 	of discharges,
avoiding 	violations 	of 	water 	quality
criteria, 	and 	specified 	reporting. 	The 	full
62-B-4
,; 	1 7 f...
CHAPTER 11-62 	APPENDIX B
statement 	of 	requirements 	appears 	in 	the
general 	permit.
4. 	Spills 	to ground only - 	with public access
1317 6 	-d
a . 	Applicability. 	Any 	wastewater 	spill 	from a
wastewater 	system onto 	the 	ground 	and 	that
does 	not 	enter 	state waters 	but 	is 	in 	an
area 	which 	is 	or 	may be 	accessible 	to 	the
public.
(1) 	In 	this 	appendix, 	the 	public 	includes
hotel , 	apartment , 	and 	condominium
residents 	and 	guests, 	or 	condominium
apartment 	owners 	at 	their own
condominium, 	and management 	personnel
and 	building 	or 	facility 	staff, 	unless
the 	person 	is 	specifically an 	operator
of 	the wastewater 	system or 	a 	manager
of the 	property.
(2) 	In 	this 	appendix, 	areas 	inaccessible 	to
the 	public 	include 	areas:
(a) 	Confined within a 	fenced 	or
walled 	(six 	foot 	high 	with
locked 	gate 	or door) 	area; 	and
(b) 	Contact 	with 	the 	spill 	is
limited 	to wastewater 	system
operating personnel 	and
management 	personnel 	for 	the
property owner or 	lessee.
(3) 	Exclusion. 	Spills 	of 	R-1 	water provided
the 	owner/agent demonstrates 	that 	the
spill 	was 	of 	R-1 	water 	and 	that 	BMPs 	as
approved 	by 	the director were
implemented .
b . 	Immediate notice 	to 	DOH. 	If a 	spill 	of a
thousand gallons 	or more 	occurs 	during
working 	hours:
62 -B-5
CHAPTER 11-62 	APPENDIX B
(1) 	On Oahu, 	the 	wastewater 	system
owner/agent 	shall 	immediately notify
the 	WWB; 	or
(2) 	On 	the neighbor 	islands, 	the
owner/agent 	shall 	immediately notify
their respective 	district EHP 	chief.
If 	a 	spill 	of 	a 	thousand gallons 	or more
occurs during 	non-working 	hours:
(1) 	Contact 	the 	state 	hospital 	operator;
and
(2) 	The 	next 	working 	day notify the WWB or
on 	the neighbor 	islands, 	the 	respective
district 	EHP 	chief with 	a 	follow-up
call.
c . 	Press 	release. 	The 	owner/agent 	shall
immediately send 	out 	a 	press 	release 	for
spills 	of 	a 	thousand 	gallons 	or more, 	and
for 	lesser spills 	if 	they present 	a
substantial 	threat 	to 	public health. 	A
press 	release 	shall 	comply with 	section 7.
d . 	Disinfection. 	The 	owner/agent 	shall
disinfect 	the 	wastewater 	that 	is 	spilled
onto 	the 	ground 	if 	the 	wastewater 	remains
ponded 	on 	the 	ground 	for 	any 	sufficient
length 	of 	time 	or 	if 	the discharge 	continues
for 	any 	significant 	duration. 	Disinfection
is 	not 	required 	if 	the 	owner/agent
demonstrates 	that 	the 	spill 	was 	R-2 	water
and 	that 	BMPs 	as 	approved by 	the 	director
were 	implemented.
e . 	Warning 	signs. 	The 	owner/agent 	shall
immediately post 	warning 	signs 	in 	the
vicinity 	of the 	spill 	area.
f . 	Clean 	up. 	All 	spill 	sites 	shall 	be 	cleared
of 	all 	debris 	and 	standing wastewater, 	and
disinfected pursuant 	to 	section 	4.d.
62-B-6
B176
CHAPTER 11-62 	APPENDIX B
In 	areas 	containing standing wastewater
which 	cannot 	be 	removed, 	the 	owner/agent
shall 	limit public 	access by having
barricades 	or 	other means.
g . 	Reporting. 	The 	owner/agent 	of a 	public 	or
private wastewater 	system 	shall 	report 	to
the WWB as 	follows:
(1) 	For 	spills 	of 	a 	thousand 	gallo n s 	or
more, 	the 	owner/agent 	shall 	report 	to
the WWB under 	section 	9.a.
(2) 	For 	spills 	less 	than 	a 	thousand
gallons, 	immediate 	notice 	and 	reporting
are 	not 	required. 	A tabulated 	summary
of 	all 	spills 	less 	than a 	thousand
gallons 	each 	shall 	be 	submitted to 	the
WWB 	on 	a 	quarterly 	basis 	in 	accordance
with 	section 	9.b.
(3) 	Exfiltration. 	Reporting 	of 	leaks 	or
breaks 	in pipelines 	discovered du ring
inflow/infiltration 	repair work 	is 	not
required. 	These 	situations 	are
considered exfi l tration.
5 . 	Spi11s 	to ground on1y - 	with no pub1ic access
a. 	Applicability. 	All 	wastewater 	spills 	from
any public or 	private wastewater 	system 	that
does 	not 	enter 	state waters 	and a r e 	i n 	a re a s
inaccessible 	to 	the 	publ i c.
(1) 	The publ i c 	and 	inaccessibility are
described 	in 	section 	4.a.
(2) 	Exclusio n . 	Spills 	of R-1 	water provided
the 	owner/agent d emonstrates 	the 	spill
was 	of 	R-1 	wa t er a nd 	that BM Ps 	as
approved by 	the 	director were
implemen t ed.
b . 	Immediate 	notice 	to 	DOH. 	If 	a 	spill 	of a
thousand gallons 	or more, 	and 	for 	spills
over 50 	ga l lons 	occu rri ng more 	than 	twi ce
62-B-7
CHAPTER 11-62 	APPENDIX B
within 	a 	12 	month, 	from 	the 	same 	cause
and/or 	locati o n, 	peri od 	within 	the 	confines
or 	fence 	line 	o f 	a 	wastewater 	system, 	the
owner/agent 	shall 	no tify 	the 	WWB within 	24
hours.
c . 	Reporting. 	For 	spills 	of a 	thousand 	gallons
or more, 	and 	for 	spills 	over 	SO 	gallons
occurring more 	than 	twice within 	a 	12 month
period, 	from 	the 	same 	cause 	and/or 	location,
within 	the 	confines 	or 	fence 	line 	of 	a
wastewater system, 	the 	owner/agent 	shall
rep o rt 	to 	the 	WWB 	under 	section 	9.a.
d . 	Recording. 	The 	owner/agent 	shall 	record 	and
tabulate 	the date 	and 	time 	of 	the 	spill, 	the
amount 	released, 	the 	cause(s) 	for 	the 	spill,
c lean up 	e ff o rts, 	and 	remedial 	actions 	taken
to 	prevent 	future 	spills 	for 	all 	spills
greater 	than 	SO 	gallons 	as 	they happen. 	The
owner/agent 	shall 	keep 	the 	records 	and
tabulations 	on 	site and make 	the 	records 	and
tabulation 	available 	to 	the director 	for
inspection 	and 	copying.
62-B-8
0176
CHAPTER 11-62 	APPENDIX B
6 . 	Spills 	to ground only - 	R-1 	and RO water only
-317 6 	· uJ. J. .
a . 	Applicability. 	Spills of 	R-1 	or 	RO 	water
provided 	the 	owner/agent demonstrates 	the
spill 	was 	of 	R-1 	or RO 	water and 	that 	BMPs
as 	approved by 	the 	director were
implemented.
b . 	Notice 	to 	DOH.
(1) 	For 	spills 	of 	a 	thousand gallons 	or
more 	occurs, 	the wastewater 	system
owner / agent 	shall 	notify 	the WWB 	at
least by phone by 	the 	end of 	the 	next
wo rking 	day. 	The 	notice 	shall 	provide
the 	information 	required by 	section
6.d(l), 	below.
(2) 	For 	spills 	of 	less 	than 	a 	thousand
gallons, 	but more 	than 	fifty 	gallons,
next day n otice 	is 	not 	required, 	but
the 	wastewater 	system owner/agent 	shall
record 	the 	information 	and 	report 	as
required 	by 	section 	6.d.
c . 	Warning 	signs. 	For 	spills 	greater 	than
fifty 	gallons, 	t h e 	owner/agent 	shall
immediately post warning 	signs 	in 	the
vicinity of 	the 	spill 	area.
d . 	Reporting. 	The 	owner/agent 	of a 	wastewater
system s h all 	r eport 	in writing 	to 	the 	WWB as
follows:
(1) 	Information of 	each 	spill 	shall 	include
at 	least 	the 	spill's 	date, 	time,
location, 	quantity, 	the 	reason 	for 	the
spill, 	and 	any 	corrective 	action.
(2) 	For 	spills 	more 	than 	fifty 	gallons, 	a
tabulated 	summary 	shall 	be 	submitted to
the 	WWB 	each 	year with 	the 	summary
report 	required by 	section 	11-62-28.
62 - B- 9
CHAPTER 11-62 	APPENDIX B
7. 	Press 	release
The 	press 	release 	shall 	describe 	the 	location 	of
the 	spill , 	the 	amount 	of wastewater released,
what 	caused 	the spill, 	and 	what 	is 	being done 	to
correct 	the 	situation. 	Also, 	include a 	contact
person 	and 	telephone 	number 	(including 	an 	after
hours/weekend 	contact) . 	At 	a 	minimum, 	the 	press
release 	shall 	be 	faxed, 	emailed or 	telephoned to
the 	following:
a. 	Associated 	Press 	(for 	radio 	dissemination);
b . 	Major 	statewide 	and 	island newspapers;
c . 	Major 	television 	news 	stations;
d. 	Department 	of Health , 	Communications 	Office,
Oahu
e. 	CWB 	if 	into 	state 	waters, 	otherwise WWB; 	and
f. 	For 	neighbor 	island 	spills, 	also 	include
faxing 	the 	press 	release 	to 	the 	respective
island 	DHOs .
8 . 	Monitoring of state waters
Monitoring 	shall begin 	as 	s o on 	as 	possible 	and be
conducted 	in 	the 	receiving 	water 	area 	affected by
the 	spill. 	Bacterial monitoring 	is 	not 	required
if 	the 	owner/agent 	demonstrates 	that 	the 	spill
was 	of 	R-1 	water 	and 	that 	BMPs 	as 	approved 	by 	the
director 	were 	implemented .
For 	spills 	entering 	fresh 	or 	brackish waters, 	the
bacterial monitoring 	shall 	consist of 	sampling
for 	the 	following 	indicator 	organisms:
a. 	Enterococci; 	and
b. 	Clostridium perfringens.
For 	spills 	entering marine 	waters, 	the 	bacterial
monitoring 	shall 	consist 	of 	sampling 	for 	the
following 	indicator organisms!
62-B-10
Bl76
CHAPTER 11-62 	APPENDIX B
a. 	Enterococci; 	and
b. 	Clostridium perfringens.
Results 	of the 	bacterial monitoring 	shall 	be
submitted 	to 	the director 	in 	care 	of the CWB
immediately. 	Monitoring 	shall 	continue 	until
notification 	to 	stop 	is 	received 	from 	the
director . 	With 	the 	approval 	of 	the director, 	on
a 	case 	by case 	situation, 	some pr ot oc ol
requirements 	such 	as 	sampling 	or 	sign posting may
be 	waived.
The 	director 	shal l 	also 	be 	informed of 	the
sampling 	stations 	and may modify the 	number 	of
stations 	and 	site 	selection.
The director may 	require 	additional 	bacterial
monitoring by the 	owner/agent 	to 	supplement 	their
existing monitoring program, 	as may be 	necessary
or 	appropriate.
g, . 	Reporting
a . 	When 	required 	above, 	the 	owner/agent 	shall
submit 	a 	written 	report 	of 	the 	details 	of
the 	spill 	within 	five 	(5) 	working 	days 	of
the 	incident 	to 	the 	director 	in 	care 	of 	the
CWB 	or WWB as 	applicable. 	The 	director may
waive 	the 	five 	day 	written reporting
requirement 	on 	a 	case by case 	basis 	provided
that 	the 	director 	receives 	a 	request 	for
waiver 	prior 	to 	the due 	date 	of 	the 	report.
The 	repor t 	shall 	include 	the 	date 	and 	time
of 	the 	spill, 	the 	amount 	released, 	the
cause(s) 	of 	the 	spill, 	location 	where 	the
spill 	entered 	state waters 	(storm 	drains,
ditches, 	streams, 	etc. ), 	clean 	up 	efforts,
remedial 	actions 	to 	prevent 	future 	spills, 	a
summary 	of 	the monitoring 	data, 	a 	map of 	t he
62-8-11
CHAPTER 11-62 	APPENDIX B
sampling 	locations 	and 	public 	notification
procedures 	if 	applicable.
b. 	For 	spills 	not 	reported 	under 	section 	9.a.
and 	when 	required 	above, 	the 	owner/agent
shall 	tabulate 	the 	following 	information :
the 	date 	and 	time 	of 	the 	spill , 	the 	amount
released, 	the 	cause(s) 	for 	the 	spill, 	clean
up 	efforts, 	and 	remedial 	actions 	taken 	to
prevent 	future 	spills . 	The 	owner/agent
shall 	submit 	each 	quarter's 	tabulation 	to
the 	WWB within 	30 days 	after 	the 	quarter.
10. 	Modifications by the director
With 	the 	approval 	or under 	the 	direction of 	the
director , 	response 	requirements 	may be 	increased,
changed , 	reduced, 	or eliminated . 	For 	example,
the director may 	require 	the 	owner/agent 	to 	post
additional Warning 	Signs 	as 	needed 	or may assist
in 	the 	removal 	of warning 	signs.
62-B-12
0176
CHAPTER 11-62 	APPENDIX C
FALLING HEAD 	TEST PROCEDURE
July 	1, 	2014
A. 	Preparing 	Percolation 	Test 	Hole(s)
1. 	Dig 	or bore a 	hole; 	four 	to 	twelve 	inches 	in
diameter 	with 	vertical 	walls 	to 	the
approximate depth 	of 	the 	soil 	absorption
system 	(bottom of 	trench 	or bed).
2. 	Scratch 	the 	side 	wall 	and bottom to 	remove
any 	smeared 	soil 	and 	remove 	loose 	material .
3. 	Place 	one 	inch 	of 	coarse 	sand 	or 	gravel 	on
bottom to 	protect 	bottom from 	scouring
action when the water 	is 	added.
B. 	Determine 	Percolation 	Rate
1. 	If 	soil 	is mostly 	clay, 	go to 	step 	D.
2. 	Place 	twelve 	inches 	of water 	in 	hole 	and
determine 	time 	to 	seep 	away. 	Record 	this
time 	on 	the 	site 	evaluation 	form.
3. 	Repeat 	step B.2. 	above. 	Also 	record 	this
time 	on 	the 	site 	evaluation 	form.
4. 	If 	the 	time 	of 	the 	second 	test 	is 	less 	than
ten minutes 	go 	to 	step C, 	if not 	skip 	to
step 	D.
C. 	Sandy 	(granular) 	Soils
1 . 	Establish a 	fixed 	reference 	point, 	add water
to 	six 	inches 	above 	gravel 	and measure 	water
level drops 	every 	ten minutes 	for 	1 	hour.
2. 	Use 	a 	shorter 	time 	interval 	if 	first 	six
inches 	seeps 	away 	in 	ten minutes 	or 	less.
3. 	After 	each measurement, 	the water 	level 	is
readjusted to 	the 	six 	inch 	level . 	At 	no
time 	during 	the 	test 	is 	the water 	level
allowed 	to 	rise more 	than 	the 	six 	inches
above 	the 	gravel.
4. 	Record 	time 	intervals 	and water 	drops 	on
site 	evaluation 	form.
5. 	Use 	final 	water 	level 	drop 	interval 	to
calculate percolation 	rate. 	( step 	F)
62-C-1
CHAPTER 11-62 	APPENDIX C
D. 	Other 	soils 	(non-granular, 	e . g . 	silt, 	loams 	and
clays)
1. 	Maintain 	at 	least 	twelve 	inches 	of water 	in
the 	hole 	for 	at 	least 	four 	hours 	to 	presoak
soil.
2. 	Do 	not 	remove 	water 	remaining 	after 	four
hours.
3. 	Permit 	soil 	to 	swell 	at 	least 	twelve 	hours.
(Dry clayey 	soils 	should be 	soaked 	and
permitted 	to 	swell 	for 	longer periods 	to
obtain 	stabilized percolation 	rates).
4. 	After 	swelling, 	remove 	loose 	material 	on 	top
of 	gravel.
5. 	Use 	fixed 	reference 	point, 	adjust water
level 	to 	six 	inches 	above 	gravel 	and measure
water 	level 	drop.
6 . 	If 	the 	first 	six 	inches 	of water 	seeps 	away
in 	less 	than 	thirty minutes, 	measure water
level 	drops 	every ten-minutes 	and 	run 	for
one 	hour.
7. 	If 	the 	first 	six 	inches 	of water 	takes
longer 	than 	thirty minutes 	to seeps 	away,
use 	thirty minute 	time 	intervals 	for 	four
hours 	or 	until 	two 	successive 	drops 	do 	not
vary 	by more 	than 	one-sixteenth 	inch
(stabilized 	rate).
8. 	After 	each measurement, 	the water 	level 	is
readjusted 	to 	the 	six 	inch 	level. 	At 	no
time 	during 	the 	test 	is 	the water 	level
allowed 	to 	rise more 	than 	the 	six 	inches
above 	the 	gravel.
9. 	Record 	time 	intervals 	and water drops 	on
site 	evaluation 	form.
10. 	Use 	final 	water 	level 	drop 	interval 	to
calculate 	percolation 	rate. 	(step 	Fl
F. Use 	final 	drop 	interval 	to 	calculate percolation
rate 	and 	record 	on 	site 	evaluation form:
Time 	Interval
Water Level 	Drop = 	Pere 	rate
62-C-2
1317 6
1317 6
CHAPTER 11-62 	APPENDIX D - 	TABLES
Type of Establishment
Airports (per passenger)
Camps:
TABLE I
July 	1, 	2014
Campground with central comfort stations
With flush toilets . no showers
Construction camps (semi-permanent)
Day camps (no meals served)
Resort camps (night and day) with limited plumbing
Luxury camps
Church
With kitchen
Without kitchen
Cottages and small dwellings with seasonal occupancy (2
persons per bedroom minimum)
Country clubs (per resident member)
Country clubs (per non-resident member present)
Dentist per chair
Doctor per patient
Dwelling (2 persons per bedroom minimum)
Factories (gallons per person, per shift , exclusive of
industrial waste)
Hair salons and barber shops ,
Bsrber shops (per chai~)
Beauty salons lper chair>
Hospitals (per bed space>
Hotels with private baths (2 person per bedroom minimum)
Institutions other than hospitals (per bed space>
Laundries , self-service (per machine)
Mobile home parks (per space>
Motels with bath, toilet . and kitchen waste (per bed space)
Picnic parks (toilets wastes only) (per picnicker)
Picnic parks with bathhouses, showers, and flush toilets
Res t aurants
Per day per seat
Per meal without public restrooms
Per meal served with toilets
Additional kitchen wastes per take out meals
Additional for bars and cocktail lounges , per seat
Schools:
Boarding
Day, without gyms, cafeteria , or showers
Day, with gyms, cafeteria , and showers
Day. with cafeteria , but without gyms or showers
service station lper vehicle served)
Swimming pools and bathhouses
Theaters:
Movie (per auditorium seat>
Drive-in (per car space)
Workers (in addition to above):
I J
Construction (at semi-permanent camps>
Day, at schools and offices (per shift)
Employee (per shift)
62-D-1
Gallons
Per Person Per Day (Unless
Otherwise Noted)
5
32
25
50
15
50
100
10
5
100
100
25
200
5
100
35
50
125
250
100
125
300
250
60
5
50
50
5
10
3
15
10 0
15
25
20
10
10
5
5
50
20
20
CHAPTER 11-62 	APPENDIX D - 	TABLES
Minimum
Horizontal
Distance
From
Wall 	line o f 	any
structure 	or
building
Property 	line
Stream, 	the 	ocean
at 	the
shoreline
certification,
pond, 	lake, 	or
other 	surface
water body
Large 	trees
Treatment 	unit
Seepage pit
Cesspool
Soil 	absorption
system
Potable water
sources 	serving
public water
systems
TABLE II
July 	1 , 	2 014
Soil
Treatment Seepage 	Absorption
Cesspool
( ft)
Unit 	Pit 	System
5
9
50
10
5
18
18
5
1000
(ft) 	( ft) 	Jill
5
5
50
5
5
5
5
5
500
62-D-2
5
9
50
10
5
12
18
5
1000
5
5
50
10
5
5
5
5
1000
CHAPTER 11-62 	APPENDIX D - 	TABLES
Pe r co lati on Rate
(min / i nch ) Less
than or e qual t o
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1 6
17
18
19
20
21
22
23
2 4
25
26
27
28
29
30
TABLE III
Ju l y 	1 , 	2014
Required 	Pe r co lati on Ra t e
Abs o rpti on Area 	(min/ in ch I Le ss
( ft 2 /bed r oo m or 	than or e qua l t o
200 aall o ns )
70 	31
85 	32
10 0 	33
11 5 	34
1 25 	35
1 33 	36
141 	37
14 9 	38
157 	39
1 65 	40
170 	41
175 	42
180 	43
1 85 	44
1 90 	4 5
194 	4 6
198 	47
202 	4 8
206 	4 9
210 	50
21 4 	5 1
218 	52
222 	53
226 	5 4
230 	55
23 4 	56
238 	57
242 	58
246 	59
250 	60
62-D-3
Re qu ire d
Ab so rpti on Area
(ft 2/ be dr oom or
200 gall o ns )
253
257
260
263
267
270
273
277
2 8 0
2 8 3
2 87
290
293
297
300
302
304
306
30 8
31 0
312
314
316
31 8
320
322
324
326
328
330
CHAPTER 11-62 	APPENDIX D - 	TABLES
TABLE IV
July 	1 , 	2014
Pollutant 	Ceiling
Pollutant 	Concentration 	Limit 	(dry
weight basis, 	mg/kg)
Arsenic
Cadmium
Chromium
Copper
Lead
Mercury
Molybdenum
Nickel
Selenium
Zinc
TABLE V
July 1, 	2014
Amount 	of 	Wastewater 	Sludge 	(Metric
Ton 	per 	365 day period, 	dry 	weight
basis)
Greater 	than 	zero but 	less 	than 	290
Equal 	to 	or greater than 	290 	but
less 	than 	1500
E9ual 	to 	or 	greater than 	1500 	but
less 	than 	15,000
Equal 	to 	or 	greater than 	15,000
Amount 	of Wastewater 	Sludge 	(English
Ton 	per 	365 day period, 	dry 	weight
basis)
Greater 	than 	zero but 	less 	than 	320
Equal 	to 	or 	greater than 	320 	but
less 	than 	1650
Equal 	to 	or 	greater than 	1650 	but
less 	than 	16,500
Equal 	to 	or 	greater 	than 	16,500
62-D-4
20
15
200
1500
300
10
25
420
25
2000
Frequency
Once 	per year
Once 	per quarter
Once 	per 60 	days
Once 	per month
Frequency
Once per year
Once per quarter
Once per 	60 	days
once per month
CHAPTER 11-62 	APPENDIX D - 	TABLES
Horizontal 	Distance
TABLE VI
Ju ly 	1 , 	2014
From
Waters 	of 	the 	United 	States, 	state 	waters,
the 	ocean 	at 	the 	vegetation 	line, 	or 	any
other 	surface 	water body
Property 	line
Occupied 	building 	or 	dwelling
Potable 	water 	source 	serving 	public 	water
systems
TABLE VII
July 1 , 	2014
Fee t
50
50
500
1000
Pollutant 	Ceiling
Pollutant 	Concentration 	Limit 	(dry
weight 	basis, 	mg/kg )
I
I
Arsenic 	20 I
Chr o mi um 	200
Nickel 	42 0
62-D-5
CHAPTER 11-62 	APPENDIX E
CHAPTER 	11-62 	FORM A
CERTIFICATION FORM - 	LAND APPLICATION
July 1, 	2014
Instructions:
1. 	Each 	form must 	be 	sign e d 	and 	dated 	to 	be 	valid.
2. 	The certifier shall print o r 	type his 	name below
the 	signature 	line 	and 	print 	or 	type 	the
certifier's 	title, 	if 	any, 	where 	indicated.
3. 	When 	the 	certifier checks 	a 	box 	or 	fills 	in 	a
line other than the signature or date lines, 	the
certifier 	shall 	initial 	below the check or the
line , 	unless 	the 	certifier 	uses 	preprinted
versions 	of 	the f orm which delete 	the boxes and
lines 	which must be 	initialed.
[ 	] 	For preparers 	only, 	I 	certify, 	under 	penalty of
law, 	that:
[ 	1 1.
[ 	) 	2 .
The pollutant 	concentration 	ceiling
limits in Table IV of 	c hapter 11-62,
HAR have been met .
The 	following 	pathogen 	requirements
have been met:
[] 	a. 	The Class A pathogen
requirements 	of 	§11-6 2-
46(a), 	HAR, 	specifi c ally
§11-62-46(a) 	( __ ); 	or
[ ] 	b. 	The Class B pathogen
requirements 	of 	40 CFR
§503.32 	(b),specifical l y
§503.32(b) 	(___ ) 	and
no tificati on 	each land
owner and 	land applier
of wastewater 	sludge
which 	I 	have prepared ,
of the 	spacing and site
restrictions 	in §11-62-
43(g), 	HAR; 	and the
62-E-1 ,,17 6
1317 6
[ 	] 	3 .
CHAPTER 11-62 	APPENDIX E
management requirements
in §11-62-43(h), 	HAR.
Vector attraction 	reduction:
[] 	a. 	One 	of the vector attraction
reduction 	requirements
in 40 CFR §503.33(b) 	(1)
through 	(8) , 	has been
met, 	specifically
§503.33(b) 	( 	); 	or
[] 	b. 	I 	have not met the one of the
requirements 	of 	40 CFR
§503.33(b) 	(1) 	through
(b) 	(8), 	and I 	informed
the 	land applier 	and the
owner 	of 	the 	land
application 	site 	that
one 	of 	the 	vector
attraction 	reduction
requirements 	in 	40 CFR
§503. 33 (b) 	(9) 	or 	(b) 	(10)
must 	be met;
[ 	] 	For 	appliers 	of 	wastewater 	sludge only, 	I
certify , 	under penalty 	of 	law, 	that:
[ 	] 	4 .
[ 	] 	5 .
[ 	] 	6 .
One 	of the 	vector 	attraction 	reduction
requirements 	in 40 CFR §503.33(b) 	(9) 	or
(b) 	( 10) 	has 	been 	met , 	specifically
§503. 33 (b) 	(__ );
The 	spacing 	and 	site restrictions 	in
§11-62-43(g) 	have been met; 	and
The management 	requirements 	in §11-62-
43(h), 	HAR have been met.
[ 	} 	For appliers of 	septage 	only, 	I 	certify, 	under
penalty of law, 	that:
( 	] 	7 . 	One 	of the 	pathogen 	requirements 	in 40
CFR §503.32(c) 	(1) 	or 	(c) 	(2) 	has been
met, 	specifically §503.32(c) 	( 	);
62-E-2
[ 	] 	8 .
[ ] 	9.
CHAPTER 11-62 	APPENDIX E
One 	of 	the 	vector 	attraction
reduction 	requirements in 40 CFR
§503.33(b) 	(9), 	(b) 	(10), 	or 	(b) 	(12)
has been met, 	specifically §503.33(b)
( __ );
The spacing 	and site restrictions 	in
§11-62-44(9), 	HAR 	have been met; 	and
[ 	] 	10. 	The 	management 	requirements 	in 	§ll-62-
44(h), 	HAR have 	been met.
I 	certify, 	under penalty of 	law, 	that 	the information
that 	will 	be used to determine 	compliance with 	the
foregoing 	requirements 	was prepared under my direction
and 	supervision in accordance with the 	system designed
to ensure that qualified personnel properly gather and
evaluate 	this 	information. 	I 	am aware 	that 	there are
significant penalties 	for 	false 	c ertification
including 	the possibility of 	fine 	and imprisonment.
Date 	Name
Title: ------------
62 -E-3 ~17 6
(f)
a:
0
z
0::
w
>ow
(";~
1-u...
:z:u...
4:0
:z:
w
I-
=:;)
u..'
_J
Amendments 	and compilation of 	chapter 	62, 	title
11, 	Hawaii Administrative 	Rules, 	on the 	Summary Page
dated 	MAR 2 1 2016 	were 	adopted on 	MAR 2 1 201h
following 	public 	hearings 	held on December 11, 	14, 	15,
17, 	18 	and 21, 	2015, 	after public notice was 	given 	in
the 	Honolulu Star-Advertiser, 	Hawaii 	Tribune-Herald,
West Hawaii 	Today, 	The Maui News, 	and The 	Garden 	Isle
on November 	23, 	2015.
The 	adoption of 	chapter 11-62 	shall 	take 	effect
ten days 	after 	filing 	with 	the Office 	of 	the
Lieutenant Governor.
\) -
of 	Health
Governor
-	9. 	State of 	Hawaii
-	1:::2
-- Dated: 	2- ( ,,.- 7 O l (e
c::	cc 	-------------::c
'°	:- 	Filed
APPROVED AS 	TO FORM:
EDWARD G. 	BOHLEN
Deputy Attorney General
62-109
Jl 7 6

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.