n-09-72.pdf

us-irs-notices-n-09-72n-09-72.pdfGuidance

Preserve advance releases and the authoritative Internal Revenue Bulletin rendition; directory timestamps are file-publication metadata, not legal effective dates. HTML bulletins begin June 2003; earlier available issues require full PDF parsing.

This collection currently includes the publisher’s available advance-release directory. Historical bulletin renditions are discovered separately; an advance-release record alone does not certify the collection archive complete.

Part III - Administrative, Procedural, and Miscellaneous

Qualifying Advanced Energy Project Credit

Notice 2009-72

# SECTION 1. PURPOSE

This notice establishes the qualifying advanced energy project program under
§ 48C(d) of the Internal Revenue Code and announces an initial allocation round of the
qualifying advanced energy project credit under the qualifying advanced energy project
program. The purpose of the qualifying advanced energy project program is to
encourage taxpayers to re-equip, expand or establish manufacturing facilities for the
production of certain energy related property.

# SECTION 2. BACKGROUND

.01 Section 46 provides that the amount of the investment credit for any taxable
year is the sum of the credits listed in § 46. That list includes the qualifying advanced
energy project credit.

.02 The qualifying advanced energy project credit is provided under § 48C.

<!-- PageBreak -->

Section 48C(a) provides that the qualifying advanced energy project credit for a taxable
year is an amount equal to 30 percent of the qualified investment (as defined in §
48C(b)) for that taxable year with respect to the taxpayer's qualifying advanced energy
project (as defined in § 48C(c)(1)). The qualifying advanced energy project credit with
respect to any project for all taxable years may not exceed the amount of credit
allocated to the project under section 5 of this notice.

.03 Section 48C(b)(1) provides that the qualified investment for any taxable year
is the basis of eligible property that is placed in service by the taxpayer during such
taxable year and is part of a qualifying advanced energy project.

.04 Section 48C(d)(1)(B) provides that the aggregate credits allowed under the
qualifying advanced energy project program may not exceed $2.3 billion.

.05 Section 48C(d)(3) specifies the criteria that must be considered in
determining which qualifying advanced energy projects are certified under § 48C(d).

.06 The at-risk rules in § 49 and the recapture and other special rules in § 50
apply to the qualifying advanced energy project credit. Further, the qualifying advanced
energy project credit generally is allowed in the taxable year in which the eligible
property (as defined in § 48C(c)(2)) is placed in service (as defined in section 4.04 of
this notice) by the taxpayer. Pursuant to § 48C(d)(2)(C), a taxpayer that receives a
certification under § 48C(d)(2) has 3 years from the date of issuance of certification to
place the qualifying advanced energy project in service. If the taxpayer does not place
the project in service by the end of that period, the certification is no longer valid. The
Internal Revenue Service (Service) has no authority to extend that period.

<!-- PageBreak -->

SECTION 3. ESTABLISHMENT OF THE QUALIFYING ADVANCED ENERGY
PROJECT PROGRAM

Section 48C(d)(1) provides that the Secretary of the Treasury or his delegate (the
Secretary), in consultation with the Secretary of Energy, shall establish a qualifying
advanced energy project program to consider and issue certifications for qualified
investments eligible for the credit to qualifying advanced energy project sponsors. The
Treasury Department and the Service hereby establish the qualifying advanced energy
project program under the rules set forth in sections 5 through 12 of this notice.

SECTION 4. DEFINITIONS

The following definitions apply for purposes of § 48C and this notice:

.01 Qualifying Advanced Energy Project. A qualifying advanced energy project is
a project that meets the following requirements:

(1) the project re-equips, expands or establishes a manufacturing facility (as
defined in section 4.05 of this notice) for the production of specified advanced energy
property or property that, after further manufacture, will become specified advanced
energy property;

(2) the Service has certified pursuant to § 48C(d)(2) that part or all of the
qualified investment in the project is eligible for a credit under § 48C; and

(3) the project does not produce any property which is used in the refining or
blending of any transportation fuel (other than renewable fuels) (i.e., a qualifying
advanced energy project can produce property which is used in the refining or blending
of any transportation fuel only if the property is used solely in the refining or blending of

<!-- PageBreak -->

transportation fuels that are renewable fuels).

.02 Specified Advanced Energy Property. Specified advanced energy property
means any of the following:

(1) property designed for use in the production of energy from the sun, wind,
geothermal deposits (within the meaning of § 613(e)(2)), or other renewable resources;

(2) fuel cells, microturbines, or an energy storage system for use with electric or
hybrid-electric motor vehicles;

(3) electric grids to support the transmission of intermittent sources of renewable
energy, including property for the storage of such energy;

(4) property designed to capture and sequester carbon dioxide and sequester
carbon dioxide emissions;

(5) property designed to refine or blend renewable fuels (but not fossil fuels) or to
produce energy conservation technologies (including energy-conserving lighting
technologies and smart grid technologies);

(6) new plug-in electric drive motor vehicles (as defined by § 30D), qualified plug-
in electric vehicles (as defined by § 30(d)), or components that are designed specifically
for use with such vehicles, including electric motors, generators, and power control units
or;

(7) other property designed to reduce greenhouse gas emissions as may be
determined by the Service.

.03 Eligible Property. Eligible property is any property (other than a building or its
structural components) that meets the following requirements:

<!-- PageBreak -->

(1) The property is necessary for the production of specified advanced energy
property described in § 48C(c)(1)(A)(i) or section 4.02 of this notice.

(2) The property is:

(a) tangible personal property; or

(b) other tangible property (not including a building or its structural components)
that is used as an integral part of the qualifying advanced energy project.

(3) Depreciation (or amortization in lieu of depreciation) is allowable with respect
to the property.

.04 Placed In Service. For purposes of § 48C, property is placed in service in the
taxable year in which the property is placed in a condition or state of readiness and
availability for a specifically assigned function. See § 1.46-3(d)(1)(ii) of the Income Tax
Regulations. Thus, a qualifying advanced energy project is placed in service in the
taxable year in which the project is placed in a condition or state of readiness and
availability for its intended purpose. Eligible property (as defined in § 48C(c)(2)) that is
a part of the project is placed in service in the taxable year in which the property is
placed in a condition or state of readiness and availability for its intended purpose.

.05 Manufacturing Facilities. For purposes of § 48C, manufacturing facilities are
facilities that make, or process raw materials into, finished products (or accomplish any
intermediate stage in that process).

.06 Advanced Energy Property Designed To Reduce Greenhouse Gas
Emissions. The Secretary may determine that a property is designed to reduce
greenhouse gas emissions in published guidance or in the letter notifying a taxpayer

<!-- PageBreak -->

that the Service has accepted the taxpayer's application for § 48C certification with
respect to the property.

# SECTION 5. QUALIFYING ADVANCED ENERGY PROJECT PROGRAM

.01 In General. The Service will consider a project under the qualifying advanced
energy project program only if the U.S. Department of Energy (DOE) provides a
recommendation and ranking for the project (DOE recommendation). DOE will provide
a recommendation and ranking only if it determines that the project has a reasonable
expectation of commercial viability and merits a recommendation based on the criteria
in § 48C(d)(3)(B). Accordingly, a taxpayer must submit, for each project that it
sponsors: (1) a preliminary application and a final application for recommendation by
DOE (application for DOE recommendation), and (2) an application for certification
under § 48C(d)(2) by the Service (application for § 48C certification). Certifications will
be issued and credits will be allocated to projects in annual allocation rounds. The initial
allocation round will be conducted in 2009-2010, and if necessary, an additional
allocation round will be conducted in 2010-2011.

.02 Program Specifications.

(1) The Service determines the amount of the qualifying advanced energy
project credit allocated to a qualifying advanced energy project at the time the Service
accepts the application for certification for that project in accordance with section
5.02(8) of this notice (see section 6 of this notice for the requirements applicable to the
application for DOE recommendation and the application for § 48C certification).

(2) The DOE recommendations will include a ranking of projects in descending

<!-- PageBreak -->

order (that is, first, second, third, etc.). The project receiving the highest ranking (that is,
first) will be allocated the full amount of credit requested before any credit is allocated to
a lower-ranked project. The amount of credit allocated to a project reduces the amount
of credit available to lower-ranked projects. The same process will apply to the second
and lower-ranked projects until the amount available for allocation is exhausted. DOE
will recommend and rank projects only to the extent necessary to exhaust the amount
available for allocation.

(3) If the amount available for allocation is not fully allocated in the 2009-2010
allocation round, a similar allocation round will be conducted in 2010-2011. The Service
will announce the results after the close of each allocation round.

(4) For each allocation round there will be an annual application period during
which a taxpayer may file its application for certification. The Service will consider a
project in an allocation round only if the application for certification for the project is
submitted during the application period for that round and the DOE provides the DOE
recommendation for the project.

(5) For the 2009-2010 allocation round, the application period for certification
begins on August 14, 2009, and ends on December 16, 2009. Any completed
application for certification submitted to the Service after August 13, 2009, and before
December 17, 2009, will be deemed to be submitted by the taxpayer on December 16,
2009.

(6) For the 2009-2010 allocation round, a preliminary application for DOE
recommendation must be submitted by September 16, 2009. A final application for

<!-- PageBreak -->

DOE recommendation must be submitted by October 16, 2009. If a final application for
DOE recommendation is received on or before October 16, 2009, DOE will determine
the feasibility of the project and (for projects determined to be feasible) provide the DOE
recommendation to the Service by December 16, 2009. See section 6.02 of this notice
and Appendix B to this notice for the information required to be submitted to DOE in an
application for DOE recommendation. Also, see Appendix B to this notice for a
discussion relating to the process for applying for DOE recommendation and the
instructions and address for filing the preliminary and final applications for DOE
recommendation.

(7) For purposes of determining the timeliness of submission of applications,
§ 7502 shall apply in determining the timeliness of any application for § 48C certification
or DOE recommendation.

(8) For the 2009-2010 allocation round, the Service will accept or reject the
taxpayer's application for § 48C certification by January 15, 2010, and will notify the
taxpayer, by letter, of its decision. If the application is accepted, the date of this letter
will be treated as the acceptance date.

(9) If the taxpayer's application for § 48C certification is accepted, the
acceptance letter will state the amount of the credit allocated to the project. If a credit is
allocated to a taxpayer's project, the taxpayer will be required to execute an agreement
in the form set forth in Appendix A to this notice. For credits allocated in the 2009-2010
allocation round, the taxpayer must execute and return the agreement to the Service by
March 15, 2010, at the appropriate address listed in section 6.04 of this notice or listed

<!-- PageBreak -->

in later guidance published in the Internal Revenue Bulletin. The Service will execute
and return the agreement to the taxpayer by April 16, 2010. The executed agreement
applies only to the taxpayer who signed the agreement. Any successor in interest must
execute a new agreement with the Service no later than the due date (including
extensions) of the successor in interest's Federal income tax return for the taxable year
in which the transfer occurs. If the successor in interest does not execute a new
agreement, the following rules apply:

(a) In the case of an interest acquired at or before the time the qualifying
advanced energy project is placed in service, any credit allocated to the project will be
fully forfeited (and rules similar to the recapture rules of § 50(a) apply with respect to
qualified progress expenditures); and

(b) In the case of an interest acquired after the qualifying advanced energy
project is placed in service, the project ceases to be investment credit property and the
recapture rules of § 50(a) (and similar rules with respect to qualified progress
expenditures) apply.

.03 For qualifying advanced energy projects that re-equip or expand a
manufacturing facility, the taxpayer's qualified investment is limited to property that re-
equips or expands the facility to produce specified advanced energy property listed in
section 4.02 of this notice.

.04 The qualifying advanced energy project credit will not be allocated to a
project with respect to any qualified investment for which a credit is allowed under § 48,
48A, or 48B, or for which a payment is received under §1603 of the American Recovery

<!-- PageBreak -->

and Reinvestment Tax Act of 2009, Division B of Pub. L. 111-5, 123 Stat 115.
SECTION 6. APPLICATIONS FOR DOE RECOMMENDATION AND § 48C
CERTIFICATION

.01 In General. An application for DOE recommendation and a separate
application for § 48C certification must be submitted for each project that a taxpayer
sponsors. If an application for DOE recommendation does not include all of the
information required by section 6.02 of this notice and meet the requirements in
sections 8.01 and 8.02 of this notice, DOE may decline to consider the application. If an
application for § 48C certification does not include all of the information listed in section
6.03 of this notice and meet the requirements in sections 8.01 and 8.02 of this notice,
the Service will not consider the application.

.02 Information Required in the Application for DOE Recommendation. A

preliminary application and final application for DOE recommendation must include the
information as requested in Appendix B to this notice.

.03 Information To Be Included in the Application for § 48C Certification.

An application for certification must include all of the following:

(1) The name, address, and taxpayer identification number of the taxpayer. If
the taxpayer is a member of an affiliated group filing consolidated returns, the taxpayer
must also provide the name, address, and taxpayer identification number of the
common parent of the group.

(2) The name, telephone number, email address, and fax number of a contact
person. For such person, attach a properly executed power of attorney, preferably on

<!-- PageBreak -->

Form 2848, Power of Attorney and Declaration of Representative.

(3) One electronic version on a CD of the completed application for DOE
recommendation submitted with respect to the project in accordance with section 6.02
of this notice.

.04 Instructions and Address for Filing § 48C Application. Applications for

certification should be marked: APPLICATION FOR § 48C CERTIFICATION. There is
no user fee for these applications. Taxpayers may submit their application by U.S. mail,
designated private delivery service (as prescribed in § 7501), or hand delivery (between
the hours of 8 a.m. and 4 p.m. Central time, Monday through Friday) to:

Internal Revenue Service
Industry Director, Natural Resources and Construction
Attn: Executive Assistant
1919 Smith Street, Floor P2
Stop HOU-1000
Houston, TX 77002

# SECTION 7. ISSUANCE OF CERTIFICATION

.01 In General. Section 48C(d)(2)(B) provides that a taxpayer shall have 1 year
from the date of acceptance of the § 48C application during which to provide evidence
that the requirements of the certification have been met. Section 48C(d)(2)(C) provides
that a taxpayer that receives a certification has 3 years from the date of issuance of the
certification to place the project in service and that the certification is void if the project
is not placed in service by the end of that three-year period.

.02 Requirements for Certification.

(1) Within 1 year from the acceptance date (as determined in section 5.02(8) of

<!-- PageBreak -->

this notice), the taxpayer must submit to the Service documentation establishing the
following:

(a) The taxpayer has received all federal, state, and local permits, including
environmental authorization or reviews necessary to commence construction of the
project.

(b) The taxpayer has completed all steps that must be accomplished during the
1-year period beginning on the acceptance date if the project is to be placed in service
before the end of the 3-year period beginning on the date of issuance of the certification
(assuming such certification will be issued on the one-year anniversary of the
acceptance date).

(2) The taxpayer must also comply with the requirements of sections 8.01 and
8.02 of this notice. The taxpayer should mark the package, "SECTION 48C
CERTIFICATION REQUIREMENTS" and send it to the appropriate address listed in
section 6.04 of this notice or listed in later guidance published in the Internal Revenue
Bulletin.

.03 Service's Action on Certification. After receiving the submission described in
section 7.02 of this notice, the Service will decide whether or not to certify the project
and will notify the taxpayer, by letter, of that decision. If the Service certifies the project,
the date of this letter is the date of issuance of the certification.

SECTION 8. OTHER REQUIREMENTS

.01 Signature. Each submission under sections 6 and 7 of this notice must be
signed and dated by the taxpayer. A stamped signature or faxed signature is not

<!-- PageBreak -->

permitted.

.02 Penalties of Perjury Statement.

(1) Each submission under sections 6 and 7 of this notice must be accompanied
by the following declaration: "Under penalties of perjury, I declare that I have examined
this submission, including accompanying documents, and, to the best of my knowledge
and belief, all of the facts contained herein are true, correct, and complete."

(2) The declaration must be signed and dated by the taxpayer. The person
signing for the taxpayer must have personal knowledge of the facts. Further, the
declaration must be signed by a person authorized to bind the taxpayer such as an
officer on behalf of a corporation, a general partner on behalf of a state-law partnership,
a member-manager on behalf of a limited liability company, a trustee on behalf of a
trust, and the proprietor in the case of a sole proprietorship. If the taxpayer is a member
of an affiliated group filing consolidated returns, the declaration also must be signed by
a duly authorized officer of the common parent of the group. A stamped signature or
faxed signature is not permitted.

.03 Significant Change in Plans. The taxpayer must inform the Service if the
plans for the project change in any significant respect from the plans set forth in the
applications for § 48C certification and DOE recommendation. A significant change is
any change that a reasonable person would conclude might have influenced DOE in
recommending or ranking the project or the Service in accepting the project application
had they known about the change when they were considering the application. Any
significant change to the plans set forth in the applications will have the following

<!-- PageBreak -->

effects:

(1) If the Service is informed of the change after the date on which the final
applications for DOE recommendation were due for the allocation round under section
5.02(6) of this notice and before the Service accepts or rejects the taxpayer's
application for certification under section 5.02(8) of this notice, the Service will not
consider the project during the allocation round; and

(2) If the Service is informed of the change after it has accepted the taxpayer's
application for certification, any allocation or certification based on that acceptance is
void.

.04 Effect of an Acceptance, Allocation, or Certification. An acceptance,
allocation, or certification by the Service under this notice is not a determination that a
project is eligible for the qualifying advanced energy project credit under § 48C or that
any property that is part of the project is an eligible property under § 48C(c)(2). The
Service may, upon examination (and after any appropriate consultation with DOE),
determine that the project does not qualify for this credit or that the property is not an
eligible property for purposes of this credit.

.05 No Right to a Conference or Appeal. A taxpayer does not have a right to a
conference relating to any matters under this notice. Further, a taxpayer does not have
a right to appeal the decisions made under this notice (including the acceptance or
rejection of the application for DOE recommendation or § 48C certification, the amount
of credit allocated to the project, or whether or not to certify the project) to any official of
DOE or the Service.

<!-- PageBreak -->

# SECTION 9. FUTURE ALLOCATION ROUNDS

.01 2010-2011 Allocation Round. If, after the allocation round in 2009-2010, the
entire credit under the qualifying advanced energy project is not fully subscribed (that is,
the aggregate credit for the program has not been fully allocated), the Service will
conduct an additional allocation round in 2010-2011. Future guidance will prescribe the
procedures applicable to applications in the 2010-2011 allocation round.

.02 Review and Redistribution of Credits. Pursuant to § 48C(d)(4)(A), the
Service will review credits allocated under § 48C not later than February 17, 2013.
Under § 48C(d)(4)(B), credits available under § 48C(d)(1)(B) may be reallocated if (i)
there is an insufficient quantity of qualifying applications for certification pending at the
time of the review, or (ii) any certification made pursuant to § 48C(d)(2) has been
revoked pursuant to § 48C(d)(2)(B). If credits under § 48C(d) are available for
reallocation, § 48C(d)(4)(C) authorizes the Service to conduct an additional program for
applications for certification. Future guidance will prescribe the procedures applicable
to applications in this program.

.03 Reduction or forfeiture of allocated credits. Under the agreement set forth in
Appendix A to this notice, the qualifying advanced energy project credits allocated
under section 5 of this notice will be reduced or forfeited in certain situations. A
taxpayer must notify the Service of the amount of any reduction or forfeiture required
under the agreement. This notification must be sent to the appropriate address listed in
section 6.04 of this notice or listed in later guidance published in the Internal Revenue
Bulletin. The amount of any reduction or forfeiture of the allocated credits will be

<!-- PageBreak -->

returned and included in the aggregate credit remaining to be allocated in the 2010-
2011 allocation round (if the reduction or forfeiture occurs before that allocation round)
and under the procedures prescribed pursuant to section 9.02 of this notice (if the
reduction or forfeiture occurs after the 2010-2011 allocation round).

SECTION 10. QUALIFIED PROGRESS EXPENDITURES

.01 Section 48C(b)(2) provides that rules similar to the rules of § 46(c)(4) and (d)
(as in effect on the day before the enactment of the Revenue Reconciliation Act of
1990) shall apply for purposes of § 48C. Former § 46(c)(4) and (d) provided the rules
for claiming the investment credit on qualified progress expenditures (as defined in
former § 46(d)(3)) made by a taxpayer during the taxable year for the construction of
progress expenditure property (as defined in former § 46(d)(2)).

.02 In the case of self-constructed property (as defined in former § 46(d)(5)(A)),
former § 46(d)(3)(A) defined qualified progress expenditures to mean the amount that is
properly chargeable (during the taxable year) to the capital account with respect to that
property. With respect to a qualifying advanced energy project that is self-constructed
property, amounts paid or incurred are chargeable to the capital account at the time and
to the extent they are properly includible in computing basis under the taxpayer's
method of accounting (for example, after applying the requirements of § 461, including
the economic performance requirement of § 461(h)).

.03 To claim the advanced energy project credit on the qualified progress
expenditures paid or incurred by a taxpayer during the taxable year for construction of a
qualifying advanced energy project, the taxpayer must make an election under the rules

<!-- PageBreak -->

set forth in § 1.46-5(o) of the Income Tax Regulations. A taxpayer may not make the
qualified progress expenditures election for a qualifying advanced energy project until
the taxpayer has received an acceptance letter for the project under section 5.02(8) of
this notice.

.04 If a taxpayer makes the qualified progress expenditures election pursuant to
section 10.03 of this notice, rules similar to the recapture rules in § 50(a)(2)(A) through
(D) apply. In addition to the cessation events listed in § 50(a)(2)(A), examples of other
events that will cause the project to cease being a qualifying advanced energy project
are:

(1) Failure to receive a certification for the project in accordance with section 7 of
this notice;

(2) Failure to place the project in service within 3 years from the date of issuance
of the certification under section 7.01 of this notice; or

(3) A significant change to the plans for the project as set forth in the
applications for § 48C certification or DOE recommendation if, under section 8.03 of this
notice, the Service's acceptance of the project is void as a result of the change.
SECTION 11. DISCLOSURE OF INFORMATION

.01 Announcement. Section 48C(d)(5) provides that the Service shall, upon
making a certification, publicly disclose the identity of the applicant and the amount of
the credit certified with respect to such applicant. Accordingly, the Service will publish
the results of the allocation process, and disclose the following information in the event
a qualifying advanced energy project credit is allocated to the taxpayer's project: (a) the

<!-- PageBreak -->

name of the taxpayer and (b) the amount of the qualifying advanced energy project
credit allocated to the project.

.02 In General. An application for DOE recommendation, an application for §
48C certification, any other documentation submitted by the taxpayer pursuant to
section 7.02 of this notice, and any documentation generated by the Service or DOE as
part of this process are return information subject to § 6103. Except for the items of
information that § 48C(d)(5) requires the Service to make available to the public, the
other material remains the applicant's confidential return information, which is exempt
from disclosure under the Freedom of Information Act (FOIA), 5 USC § 552(b)(3), in
conjunction with § 6103. Other FOIA exemptions may also apply. For example, FOIA
includes exemptions for trade secrets and commercial or financial information (5 USC §
552 (b)(4)), as well as personal information (5 USC § 552(b)(6)).

.03 FOIA requests. Anyone interested in submitting a request for records under
the FOIA with respect to the qualifying advanced energy project program under § 48C
(including a request for records relating to the application for DOE recommendation)
should direct a request that conforms to the Service's FOIA regulations, found at 26
C.F.R. § 601.702, to the following address:

IRS FOIA Request
Baltimore Disclosure Office
Room 940
31 Hopkins Plaza
Baltimore, MD 21201

SECTION 12. EFFECTIVE DATE

This notice is effective August 14, 2009.

<!-- PageBreak -->

## SECTION 13. PAPERWORK REDUCTION ACT

The collection of information contained in this notice has been reviewed and
approved by the Office of Management and Budget (OMB) in accordance with the
Paperwork Reduction Act (44 U.S.C. § 3507) under control number 1545-2151.

An agency may not conduct or sponsor, and a person is not required to respond
to, a collection of information unless the collection of information displays a valid OMB
control number.

The collections of information in this notice are in sections 5, 6, 7, 8, and
Appendix B of this notice. This information is required to obtain an allocation of
qualifying advanced energy project credits. This information will be used by the Service
to verify that the taxpayer is eligible for the qualifying advanced energy project credits.
The collection of information is required to obtain a benefit. The likely respondents are
business or other for-profit institutions.

The estimated total annual reporting burden is 110 hours.

The estimated annual burden per respondent varies from 70 to 150 hours,
depending on individual circumstances, with an estimated average of 110 hours. The
estimated number of respondents is 1000.

The estimated annual frequency of responses is on occasion.

Books or records relating to a collection of information must be retained as long
as their contents may become material in the administration of any internal revenue law.
Generally, tax returns and return information are confidential, as required by 26 U.S.C.
§ 6103.

<!-- PageBreak -->

### SECTION 14. DRAFTING INFORMATION

The principal author of this notice is Philip Tiegerman of the Office of Associate
Chief Counsel (Passthroughs & Special Industries). For further information regarding
this notice contact Philip Tiegerman at (202) 622-3110 (not a toll-free number). For
further information regarding the application for certification, the documentation to be
submitted to the Service establishing that the requirements of § 48C(d)(2) are satisfied,
and the issuance of the certification that the requirements of § 48C(d)(2) are satisfied,
contact Tina Meaux, Executive Assistant, Office of the Industry Director, Natural
Resources and Construction, at (713) 209-3615 (not a toll-free number).

<!-- PageBreak -->

# APPENDIX A AGREEMENT

[Insert taxpayer's name, address, and identifying number] ("Taxpayer") and the
Commissioner of Internal Revenue ("Commissioner") make the following agreement:
WHEREAS:

1\. On or before [insert date and year], Taxpayer submitted to the Internal
Revenue Service ("IRS"), an application for certification under the qualifying advanced
energy project program described in Notice 2009-72 ("Application for § 48C
Certification");

2\. Taxpayer's Application for § 48C Certification is for the qualifying advanced
energy project (the "Project") described below --

(1) The Project will be located at [insert address or other identifying designation];

(2) The Project [insert either: "re-equips"; "expands"; or "establishes"] a
manufacturing facility for the production of [insert type of property as described in §
48C(c)(1)(A)(i)(I) - (VII)].

(3) On [insert date of acceptance letter issued under section 5.02(8) of Notice
2009-72, the IRS accepted Taxpayer's Application for § 48C Certification for the Project
and allocated a qualifying advanced energy project credit under § 48C in the amount of
$[insert number] to the Project.

<!-- PageBreak -->

NOW IT IS HEREBY DETERMINED AND AGREED FOR FEDERAL INCOME TAX
PURPOSES THAT:

1\. The total amount of the qualifying advanced energy project credit to be
claimed for the Project under § 48C(a) must not exceed $[insert the number in
WHEREAS clause #3].

2\. If Taxpayer fails to satisfy the certification requirements under section 7.02 of
Notice 2009-72 within the time specified in § 48C(d)(2)(B) (1 year from [insert the date
in WHEREAS clause #3]), or if the IRS does not issue a certification for the Project
under Notice 2009-72, the qualifying advanced energy project credit in the amount of
$[insert the number in WHEREAS clause #3] allocated to the Project is fully forfeited.

3\. Taxpayer will notify the IRS in writing to the address listed in section 6.04 of
Notice 2009-72 when the Project is placed in service.

4\. If the Project is not placed in service by Taxpayer within 3 years of the date of
issuance of the certification as determined under section 7.03 of Notice 2009-72, the
qualifying advanced energy project credit in the amount of $[insert the number in
WHEREAS clause #3] allocated to the Project is fully forfeited.

5\. If the plans for the Project change in any significant respect from the plans set
forth in the application for DOE recommendation (as defined in section 5.01 of Notice
2009-72) and the Application for § 48C Certification (as defined in section 5.01 of Notice
2009-72) and, under section 8.03 of Notice 2009-72, the acceptance of Taxpayer's
Application for § 48C Certification on [insert the date in WHEREAS clause #3] is void,
the qualifying advanced energy project credit in the amount of $[insert the number in

<!-- PageBreak -->

WHEREAS clause #3] allocated to the Project is fully forfeited.

6\. Taxpayer will not claim the qualifying advanced energy project credit under
§ 48C for any qualified investment for which a credit is allowed under §§ 48, 48A, or
48B or for which a payment is received under § 1603 of the American Recovery and
Reinvestment Act of 2009, Division B of Pub. L. 111-5, 123 Stat 115.

7\. If Taxpayer elects to claim the qualifying advanced energy project credit on the
qualified progress expenditures paid or incurred by Taxpayer during the taxable year(s)
during which the Project is under construction and the Project ceases to be a qualifying
advanced energy project (whether before, at the time, or after the Project is placed in
service), rules similar to the recapture rules in § 50(a)(2)(A) through (D) apply.

8\. Taxpayer reasserts that the following information is trade secret or proprietary
information: [Insert "All information identified as trade secret or proprietary in
Taxpayer's application for DOE recommendation" or list the specific information in
Taxpayer's application for DOE recommendation to which the reassertion applies.]

9\. This agreement applies only to Taxpayer. Any successor in interest must
execute a new agreement with the IRS. If the interest is acquired at or before the time
the Project is placed in service and the successor in interest fails to execute a new
agreement, the qualifying advanced energy project credit in the amount of $[insert the
number in WHEREAS clause #3] allocated to the Project is fully forfeited. If the interest
is acquired after the time the Project is placed in service and the successor in interest
fails to execute a new agreement, the Project ceases to be investment credit property
and the recapture rules of § 50(a) apply.

<!-- PageBreak -->

# THIS AGREEMENT IS FINAL AND CONCLUSIVE EXCEPT:

1\. The matter it relates to may be reopened in the event of fraud, malfeasance, or
misrepresentation of a material fact;

2\. It is subject to the Internal Revenue Code sections that expressly provide that
effect be given to their provisions notwithstanding any law or rule of law; and

3\. If it relates to a tax period ending after the date of this Agreement, it is subject
to any law enacted after such date, which applies to the tax period.

By signing, the parties certify that they have read and agreed to the terms of this
Agreement.

Taxpayer: [insert name and identifying number]

By:

Date Signed:

[insert name]

Title: [insert title]

[insert taxpayer's name]

## Commissioner of Internal Revenue

By:

Date Signed:

[insert name]

Title: [insert title]

<!-- PageBreak -->

I have examined the specific matters involved and recommend the acceptance of
the proposed agreement.
(Receiving Officer)
(Title)
Date Signed

I have reviewed the specific matters involved and recommend the acceptance of
the proposed agreement.

(Reviewing Officer)

(Title)

Date Signed

<!-- PageBreak -->

# APPENDIX B

## REQUEST FOR APPLICATIONS FOR DOE RECOMMENDATION

The Internal Revenue Service ("IRS") with the assistance of the Department of Energy
("DOE") seeks to select for certification applications that demonstrate a reasonable
expectation of commercial viability and is eligible for consideration based on the
selection criteria in § 48C(d)(3)(B). To be eligible, applications must be for qualifying
advanced energy projects and projects must be commercially feasible.

This Request for Applications for DOE Recommendation:

1\. Describes the information to be provided by the applicant to allow DOE to
review and recommend projects, and

2\. Identifies the merit review criteria and Program Policy Factors to be used by
DOE in the review of applications.

In conducting this review, the DOE may utilize assistance and advice from qualified
personnel from other Federal agencies and/or contractors that do not have a personal
or organizational conflict of interest. DOE will obtain assurances in the form of a non-
disclosure acknowledgement/agreement in advance from all reviewers that application
information shall be kept confidential and used only for reviewing purposes.

DOE reserves the right to request clarifications and/or supplemental information from
some or all applicants through written submissions and/or oral presentations.

DOE may determine whether to recommend an application to the IRS at any time after
the application has been received, without further exchanges or discussions. Therefore,
all applicants are advised to submit their most complete and responsive application.

Applications will not be returned.

Neither a procurement action (under Title 48 of the Code of Federal Regulations) nor a
financial assistance award (under 10 CFR Part 600) is contemplated based on an
application.

<!-- PageBreak -->

# SUBMISSION INFORMATION FOR DOE RECOMMENDATION PROCESS

## A. General

An application for DOE recommendation and ranking must include a Project Information
Memorandum as described below, together with the information required by sections
6.02, 8.01, and 8.02 of Notice 2009-72 (Notice.) All applications shall be prepared in
accordance with this request for applications for DOE recommendation in order to
provide a standard basis for review and to ensure that each application will be uniform
as to format and sequence.

Each application should clearly address each merit review criterion and program policy
factor to demonstrate the applicant's capability, knowledge, and experience regarding
the requirements described herein.

Applicants should fully address the requirements of the Notice and this request and not
rely on the presumed background knowledge of reviewers. DOE may reject an
application that does not follow the instructions regarding the organization and content
of the application when the nature of the deviation and/or omission precludes
meaningful review of the application.

## B. Unnecessarily Elaborate Applications

Unnecessarily elaborate brochures or other presentations beyond those sufficient to
present a complete and effective application are not desired. Elaborate art work,
graphics and pictures are neither required nor encouraged.

## C. Application Submission for DOE Recommendation

The application to DOE must include the information and documentation required by
sections 8.01 and 8.02 of the Notice.

An application to DOE will not be considered in the allocation conducted in 2009-2010
unless the preliminary application is received by September 16, 2009 and the final
application is received by October 16, 2009. Two electronic copies (on a compact disc)
of both the preliminary application and final application should be sent to DOE: one
original with full text and one copy with confidential information redacted.

If elements of and/or attachments to an application contain information the applicant
considers to be trade secret, confidential, privileged or otherwise exempt from
disclosure under the Freedom of Information Act (FOIA, 5 U.S.C. 552), the applicant

<!-- PageBreak -->

shall assert a claim of exemption at the time of application by placing the following text
on the first page of the application, and specify the page or pages of the application to
be restricted:

"The data contained in pages
I of this document which hereby forms a part
of the application have been submitted in confidence and contain trade secrets or
proprietary information, and such data shall be used or disclosed only for review
purposes, provided that, if this applicant is issued a tax credit under Section 1302
of the American Recovery and Reinvestment Act of 2009 as a result of or in
connection with the submission of this application, DOE shall have the right to
use or disclose the data herein, other than such data that have been properly
reasserted as being trade secret or proprietary in the agreement required under
section 5.02 of Notice 2009-72. This restriction does not limit the government's
right to use or disclose data obtained without restriction from any source,
including the applicant."

To further protect trade secret, confidential, privileged or otherwise exempt information,
each line or paragraph on the page or pages containing such data must be specifically
identified and marked with text that is similar to the following:

"The following contains proprietary information that [name of applicant] requests
not be released to persons outside the Government, except for purposes of
review."

Applications may be submitted electronically to 48Capplications@hq.doe.gov.
Alternatively, applications may be submitted to the physical address which will be
posted on www.energy.gov/recovery/48C.htm.

THE INFORMATION REQUIRED BY THIS REQUEST FOR APPLICATIONS FOR
DOE RECOMMENDATION MUST BE SUBMITTED USING THE FORMAT AND THE
HEADINGS OF THE "PROJECT INFORMATION MEMORANDUM" AS DESCRIBED
BELOW.

To aid in review, applications shall be clearly and concisely written and logically
assembled. All pages of each part shall be appropriately numbered and identified with
the name of the applicant and the date.

The application, including the Project Information Memorandum, MUST be formatted in
one of the following software applications:

Microsoft Wordtm 2002 or later edition
Microsoft Excel™ 2002 or later edition
Adobe Acrobat™ PDF 6.0 or later edition

<!-- PageBreak -->

Financial models should be submitted using the Excel spreadsheet and must include
calculation formulas and assumptions.

The applicant is responsible for the integrity and structure of the electronic files. The
DOE will not be responsible for reformatting, restructuring or converting any files
submitted in response to this request.

The Project Information Memorandum, excluding Appendices, shall not exceed thirty
(30) pages for the final application. Pages in excess of the page limitation will not be
considered for review. All text shall be typed, single spaced, using 12 point font, 1 inch
margins, and unreduced 8-1/2-inch by 11-inch pages. Illustrations and charts shall be
legible with all text in legible font. Pages shall be sequentially numbered. Except as
otherwise noted herein, the page guidelines previously set forth constitute a limitation
on the total amount of material that may be submitted for review. No material may be
incorporated in any application by reference as a means to circumvent the page
limitation.

Application sections shall be saved as separate files and named as described below:

APPLICATION SECTION

FILE NAME

Preliminary Application

Preliminary Application applicant name.doc (or .pdf)

Project Information Memorandum

Project Information Memorandum applicant name.doc (or .pdf)

Chapter 1. Executive Summary Chapter 2. Advanced Energy Project Qualification Chapter 3. Emissions and Pollution Impact Chapter 4. Technological Innovation Chapter 5. Project Schedule

Applicant Data Input Spreadsheet

Applicant Data Input Spreadsheet applicant name.xls

Appendices

Appendix 1 applicant name.doc (or .pdf), and as needed Appendices 2, 3, 4 etc.

<!-- PageBreak -->

## D. Application Process for DOE Recommendation and Due Dates

DOE requires a short summary of the project in the form of a preliminary application as
well as a final application. Please read carefully the Notice and the statute to determine
if your project is eligible for the manufacturing tax credit. The tax credits are for
manufacturing facilities; they are not for renewables or energy efficiency
installation projects.

DOE plans to review applications and recommend for tax credits through the following
specific steps:

Application Timeline

Due Date

Applicant submission of a Preliminary Application

9/16/2009

Applicant submission of a Final Application

10/16/2009

DOE completion of merit review of Final Applications

12/16/2009

## E. Preliminary Application Content and Format

The applicant should fill out the preliminary application in Section I, which is for the DOE
to preview the types of forthcoming final applications in order to establish the relevant
resources for an efficient and effective review process.

In part 2 of the preliminary application, "Narrative Describing the Scope of the Project",
the applicant should provide a brief description of the project, including such details as:

· A summary of the project.

. The specified advanced energy property (SAEP) the re-equipped, expanded or
new manufacturing facility will produce. In the case of a project producing
property that, after further manufacture, will become SAEP, the applicant should
describe both the property produced at the facility and the SAEP for which the
produced property will be used.

· Current project status and progress to date.

· Project schedule and milestones through the placed in service date.

## F. Final Application Process

DOE will review and recommend projects based on the following eligibility and
evaluation criteria and Program Policy Factors:

### Eligibility Criteria

· Eligibility Criterion 1: qualifies as an advanced energy project

· Eligibility Criterion 2: has a reasonable expectation of commercial viability

<!-- PageBreak -->

### Evaluation Criteria

· Evaluation Criterion 1: provides the greatest domestic job creation (both direct
and indirect) during the credit period (February 17, 2009, through February
17, 2013);

· Evaluation Criterion 2: provides the greatest net impact in avoiding or
reducing air pollutants or anthropogenic emissions of greenhouse gases;

· Evaluation Criterion 3: has the greatest potential for technological innovation
and commercial deployment, as indicated by (i) the production of new or
significantly improved technologies, (ii) improvements in levelized costs and
performance, and (iii) manufacturing significance and value; and

· Evaluation Criterion 4: has shortest project time from certification to
completion.

These four Evaluation Criteria are all equally weighted.

#### Program Policy Factors

· Program Policy Factor 1: Geographic Diversity

· Program Policy Factor 2: Technology Diversity

· Program Policy Factor 3: Project Size Diversity

· Program Policy Factor 4: Regional Economic Development

In an effort to make the application process suitable to a diverse set of projects and
streamline the DOE review, applicants must input the data necessary to address the
merit review criteria into the Applicant Data Input Spreadsheet, shown in Section J1.

Each proposed project will be reviewed based on the SAEP produced at the
manufacturing facility. In the case of a project producing property that, after further
manufacture, will become SAEP, the DOE will review the project based on the SAEP for
which the property produced at the facility will be used. For example, the review under
the emissions criterion for a project that manufactures wind turbine blades will be in the
context of the emissions profile of wind turbines, rather than the more narrow
characteristics of blade production alone. In this example, the wind turbine blade will be
assigned a portion of the overall emissions profile of a wind turbine based on the
percentage of the wind turbine's cost that is attributable to the wind turbine blade, as
discussed in Section G below.

1
If an applicant can justify that it has a value that better represents its project than the values referenced
in the Applicant Data Input Spreadsheet, the applicant may 1) select a value reported in the open
literature, justify the use of this value as opposed to one supplied by DOE, and perform any necessary
unit conversions, or 2) develop an independent estimate analogous to ones supplied in the Section H.
Any customized calculations should be done according to commonly accepted industry standards and be
sufficiently transparent to be reproducible by the merit review panel.

<!-- PageBreak -->

The applicant must calculate the incremental energy produced, saved or stored due to
the project. The applicant will be required to provide and show the work used to
produce derived numeric values specific to its manufacturing facility. In addition, it is
critical that the applicant show and support all necessary calculation steps in the
project's narrative.

The DOE review and recommendation process generally requires the use of the United
States (U.S.) national averages (e.g., national grid mix, national fleet fuel efficiency) as
a baseline for certain comparisons2.

## G. Final Application Content and Format

This section outlines the format of the final application to be submitted by the applicant
to the DOE for project recommendation. Guidelines and suggestions for specific
content are included below.

Outline for Final Application

## I. EXECUTIVE SUMMARY AND INTRODUCTION

Provide an overall summary of the project to manufacture qualifying advanced
energy property, covering things such as:

· A description of the project, including incremental manufacturing capacity.

. Location of the project.

· The SAEP the re-equipped, expanded or new manufacturing facility will
produce. In the case of a project producing property that, after further
manufacture, will become SAEP, the applicant should describe both the
property produced at the facility and the SAEP for which the produced
property will be used.

· The amount of tax credit requested and the estimated amount that will be
treated as a qualified investment. (The applicant must request a credit equal
to 30 percent of the estimated amount that will be treated as a qualified
investment (as determined under § 48C) if the project is certified as a
qualified advanced energy project. The applicant may use any reasonable
methodology and assumptions in determining such estimated amount.)

· Current project status and schedule, with milestones, through the placed in
service date.

2 An applicant may provide a different baseline for comparison if the applicant can justify that the specified
advanced energy property attributable to the project will be put in service in a more narrowly-defined
geographic region. Any customized calculations should be done according to commonly accepted
industry standards and be sufficiently transparent to be reproducible by the merit review panel.

<!-- PageBreak -->

· Summary of the main parties to the project, including owners, investors and
technical partners.

· Summary of the financial strength of owners, investors and technical partners
and the technical capabilities and experience of the technical partners
providing key components to the project.

· Overview of the intellectual property arrangements with respect to the
property produced.

· Confirmed or potential customers who will purchase, lease or use the
property produced.

## II. DEMONSTRATION OF ELIGIBILITY

## A. ADVANCED ENERGY PROJECT QUALIFICATION

To facilitate a determination of eligibility that the project qualifies as an advanced
energy project, the applicant should submit a description of the proposed project,
including such details as:

1\. Whether the project will re-equip, expand or establish a manufacturing facility.

2\. The SAEP the re-equipped, expanded or new manufacturing facility will
produce. In the case of a project producing property that, after further
manufacture, will become SAEP, the applicant should (a) describe both the
property produced at the facility and the SAEP for which the produced
property will be used, and (b) state the percentage of the property produced
at the facility that will be used for the production of SAEP.

## B. COMMERCIAL VIABILIITY

To describe the project economics and present evidence of commercial viability,
the applicant should provide as appendices:

1\. A business plan which provides a description of the proposed project,
containing such information as:

a. A list of the key management team members who will design, construct,
permit, and operate the facility.

b. A description of the capabilities and experience of the applicant,
contractor, and suppliers of major subsystems or equipment. The
applicant should demonstrate that the management team members have
a corporate history of successful completion of similar projects, including,
if applicable, similar projects completed outside the U.S.

c. The financing and ownership structure, including all beneficiaries. The
applicant must be a U.S. taxpayer.

d. The financial strength of owners, investors and technical partners.

<!-- PageBreak -->

e. Overview of intellectual property arrangements with respect to the
property produced.

f. The estimated amount that will be treated as a qualified investment (as
determined under § 48C) if the project is certified as a qualified advanced
energy project. The applicant may use any reasonable methodology and
assumptions in determining such estimated amount3.

g. The estimated amount, together with a description of the methodology and
assumptions used in determining such costs, of the following expenses, if
applicable:

i. Costs of acquisition, lease, or rental of real property, including
engineering fees, surveys, title insurance, recording fees, and legal
fees incurred in connection with land acquisition, lease or rental,
site improvements, site restoration, access roads, and fencing;

ii.
Costs of engineering, design, architectural, legal and bond fees,
and insurance paid in connection with construction of the facility;
and materials, labor, services, travel and transportation for facility
design, construction, startup, commissioning and shakedown;

iii. Costs to provide equipment, facilities, and services related to safety
and environmental protection;

iv. Financial and legal services costs, including other professional
services and fees necessary to obtain required licenses and
permits and to prepare environmental reports and data;

v. Costs of issuing project debt, such as fees, transaction and legal
costs and other normal charges imposed by lenders;

vi. Costs of necessary and appropriate insurance and bonds of all
types;

vii. Costs of obtaining licenses to intellectual property necessary to
design, construct, and operate the project;

viii. A reasonable contingency reserve for cost overruns during
construction;

ix. Capitalized interest necessary to meet market requirements,
reasonably required reserve funds and other carrying costs during
construction; and

x. Other necessary and reasonable costs.

h. The timeframe, with milestones, required for construction and
commissioning of the project.

i. Confirmed or potential customers who will purchase, lease or use the
property produced.

j. A description of the amount and timing of off-take agreements to be
entered into prior to commercial operation and the financial strength of off-
takers.

3 The applicant should note that eligible property does not include a building or its structural components.

<!-- PageBreak -->

k. A discussion of current competing products and competitors likely to enter
the target market.

l. If applicable, any infrastructure improvements necessary for target
markets, the concurrent capital needed, and other factors necessary for
deployment of the SAEP attributable to the project.

2\. A financial plan for the proposed project, containing such information as:

a. The amount of equity to be invested and the sources of such equity.
Include as a separate appendix copies of any existing equity funding
commitments or expressions of interest from equity funding sources for
the project.

b. The amount of the total debt obligations to be incurred and the funding
sources of all such debt. Include as a separate appendix copies of any
existing debt funding commitments or expressions of interest from debt
funding sources for the project.

c. Any other Federal, State or local government funding assistance.

d. A financial model detailing the investments in and the cash flows
generated and anticipated from the project over the project's expected
lifecycle, including a complete explanation of the facts, assumptions, and
methodologies in the financial model.

## III. EVALUATION CRITERIA

### A. DOMESTIC JOB CREATION

The DOE will primarily focus on direct job creation for this evaluation criterion.
In addition, DOE will take into consideration indirect job creation. For both
direct and indirect jobs, DOE will emphasize those jobs that are created during
the credit period (February 17, 2009, through February 17, 2013).

Please fill out the "Direct Jobs" tab in the Applicant Data Input Spreadsheet and
list the direct jobs in terms of full-time equivalents (FTEs) that will be created
during both construction and operation of your facility.4 Please be as specific
as possible, as reviewers will assess the reasonableness of applicants'
assertions. Direct Jobs are jobs of people whose work is directly billed to the
project.

4 Full-time equivalent (FTE) is a way to measure a worker's involvement in a project. An FTE of 1.0
means that the person is equivalent to a full-time worker, while an FTE of 0.5 signals that the worker is
only half-time. FTE is defined by the Government Accountability Office (GAO) as the number of total
hours worked divided by the maximum number of compensable hours in a work year as defined by law.
For example, if the work year is defined as 2,080 hours, then one worker occupying a paid full time job all
year would consume one FTE. Two employees working for 1,040 hours each would consume one FTE
between the two of them.

<!-- PageBreak -->

Do not list Indirect Jobs. Indirect Jobs are employees in the supply chain who
are not included as direct jobs. Examples include those working for producers
of materials, equipment, and services that are used on the project, such as
steel producers, accounting services or end use installers. The review team
will calculate the indirect jobs using a consistent methodology based on
nationwide input/output economic models for advanced manufacturing.

## B. IMPACT ON AIR POLLUTION AND ANTHROPOGENIC EMISSIONS OF GREENHOUSE GASES

Describe the direct impact that the SAEP will have on air pollution and
anthropogenic emissions of greenhouse gases (GHG). Annual pollution and
GHG emissions from the manufacture, deployment, and operation of the
manufactured product should be quantified and discussed. This description
includes:

1\. Total emissions reduced as derived by the project's Attributable Annual
Manufacturing Capacity (AAMC) and the output of the Applicant Data Input
Spreadsheet, as shown in Section J, for the re-equipped, expanded or new
manufacturing facility. Emissions reduction will be divided by the amount of
tax credit requested to determine a normalized value for comparing different
project proposals.5

2\. A discussion of additional emissions considerations beyond the calculation
in part 1, above. This should include such details as the emissions of the
manufacturing facility relative to the emissions of comparable manufacturing
facilities.

3\. A discussion of GHG emissions and air pollutants generated, along the full
supply chain, for the manufacture, installation, operation, and
decommissioning of the SAEP to which the project will contribute. If this is
unknown, the applicant should make an estimate based on the SAEP, using
cited numbers.

## C. TECHNOLOGICAL INNOVATION AND COST REDUCTION

To present evidence of the potential for technological innovation and commercial
deployment, as indicated by (i) the production of new or significantly improved
technologies, (ii) improvements in levelized costs and performance, and (iii)

5 If the applicant believes that the total emissions reduced from the specified advanced energy property
attributable to the project is not accurately represented by the values provided in the Applicant Data Input
Spreadsheet, the applicant may, in addition to completing the respective sections of the Applicant Data
Input Spreadsheet, provide a transparent justification of a different calculation and should employ cited
numbers wherever assumptions are made.

<!-- PageBreak -->

manufacturing significance and value, the applicant should provide:

1\. A discussion of whether the project will produce a new or significantly
improved technology as compared to commercial technologies currently in
service in the U.S. 6,7

2\. Calculations of incremental cost improvements for the SAEP attributable
to the facility, relative to comparable existing energy solutions. This
information is captured with the related metrics of cost advantage over
competitors, levelized cost, and the cost of CO2 abatement. Section G(IV)
below explains these metrics and their quantification in greater detail.
a. In addition to cost improvements, the applicant should describe other
technological improvements for the SAEP attributable to the facility, as
compared to the respective baseline energy solution.

3\. A calculation of the AAMC in the "Attributable Manufacturing" tab of the
Applicant Data Input Spreadsheet. The AAMC will be divided by the
amount of tax credit requested to determine a normalized value for
comparing different project proposals.

## D. PROJECT SCHEDULE AND TIME TO COMPLETION

1\. To quantify the time from certification to completion, the applicant should
fill out the respective sections of the "Applicant Data Sheet" tab of the
Applicant Data Input Spreadsheet. The dates required are: date of
receiving all permits; date of construction; date of commencement of
production.

2\. In addition, the applicant should provide a narrative supporting the
applicant's capability to accomplish the technical objectives of the
proposed project and demonstrating the overall feasibility of implementing
the project at the proposed site. This includes, but is not limited to:
a. A project schedule that (1) is comprehensive and provides sufficient
detail to demonstrate how applicant will meet the certification
requirements, and (2) demonstrates that the project is on track to be
placed in service within 3 years of such certification. The schedule

6 A new or significantly improved technology means a technology that is concerned with the production,
consumption or transportation of energy is not a commercial technology currently in use in the U.S., and
either (i) has only recently been developed, discovered or learned; or (ii) involves or constitutes one or
more meaningful and important improvements in productivity or value in comparison to commercial
technologies currently in use in the U.S.

A commercial technology currently in use in the U.S. means a technology currently in general use in the
commercial marketplace in the U.S. A technology is in general use if it has been installed in and is being
used in three or more commercial projects in the U.S. in the same general application as in the proposed
project, and has been in operation in each such commercial project for a period of at least five years. The
five-year period shall be measured, for each project, starting on the in-service date of the project or facility
employing that particular technology and ending on October 16, 2009.

<!-- PageBreak -->

should demonstrate that the applicant understands the required tasks
and has allowed realistic times for accomplishing the technical and
financial tasks. The schedule should include the milestones.

b. A description of the applicant's plan to obtain and complete all
necessary permits, and environmental authorizations and reviews.

c. A description of the current infrastructure at the site available to meet
the needs of the project.

3\. This section requires the following documentation, as is applicable to the
project, to be included as appendices:

a. A complete list of all Federal, Federal, State, and local permits,
including environmental authorizations (if applicable) or reviews,
necessary to commence construction of the project. Explain what
actions have been taken to date to satisfy the required authorizations
and reviews, and the status of each.

b. Documentation supporting applicant's conclusion that the proposed
site can fully meet all environmental, water supply, transmission
interconnect (if applicable), and other applicable requirements. Such
documentation may include signed agreements, letters of intent, or
term sheets, such as for supply and product transportation, and
regulatory approvals (if applicable) supporting the key claims.

c. Documentation demonstrating the applicant's ownership or control of
the project site, such as a deed, a signed option to purchase the site
from the site owner, or a letter of intent to sell or lease.

d. Copies of the contracts or summaries of the key provisions of the
following agreements:

i. Operations & Maintenance Agreement: include a summary of the
terms and conditions of the contract and a copy of the contract.

ii. Shareholders Agreement: summarize key terms and include the
agreement as an appendix.

iii. Engineering, Procurement and Construction Agreement: describe
the key terms of the existing or expected contract arrangement,
including firm price, liquidated damages, hold-backs, performance
guarantees, etc.

## IV. INSTRUCTIONS REGARDING QUANTITATIVE FACTORS INFORMATION SUBMISSION

Applicants should fill out the Applicant Data Input Spreadsheet with the relevant
data and include it with the application. This is intended to capture information in
a consistent manner to allow a quantitative comparison to be made across all
eligible projects. It is essential that applicants conform to this process in order to
ensure a competitive review of all proposals. Additionally, applicants should
substantiate in their narrative any data which is inputted into the Applicant Data

<!-- PageBreak -->

Input Spreadsheet. Specifically, applicants should cite or justify their stated
assumptions and show any calculations which are not performed by the
Applicant Data Input Spreadsheet. The information below provides instructions
for inputting data, examples specific to each type of SAEP, and guidance on how
to use the reference data listed in Section H.

# AAMC

In order to assess the significance of an applicant's proposed project, the
following formulas (or their equivalent) must be used to quantify the AAMC.
AAMC measures the total impact over the lifetime of deployed property which is
attributable to one year of manufacturing. The AAMC will be divided by the
qualified investment to determine the relative value, per dollar of tax credit, of
different project proposals. Finally, the AAMC will be used to assess production
significance and emissions abatement on a per-dollar-of-tax-credit basis.

General AAMC Instructions: The AAMC is calculated with four terms, annual
production, fractional system contribution, annual performance of the SAEP, and
expected lifetime of the deployed property. For annual production, applicants are
required to justify the claimed production by providing yield loss (both
manufacturing and downstream) and throughput data wherever possible. In
particular, applicants should discuss previous manufacturing experience on
similar or identical manufacturing equipment. If the applicant's annual production
is not measured in terms of kWh, gallons of gasoline, or Mtons CO2 (e.g., solar
water heating, biodiesel, or methane gas recapture, respectively) then a
conversion factor between the units of measurement and kWh, gallons of
gasoline, or Mtons CO2 should be cited and applied. When calculating the
fractional system contribution, applicants should transparently state and justify
(with citations wherever possible) current and future pricing assumptions for all
significant value chain segments, including the property produced at the
proposed facility. To calculate real-world annual performance, applicants should
identify and employ the necessary de-rating factors, including degradation rates,
such that the claimed annual performance is reflective of the average annual
performance over the lifetime of the SAEP. Where appropriate, typical resource
and use conditions should be chosen from the reference data provided in Section
H. If the necessary reference data is not available or representative of the
applicant's specific manufactured property, the applicant should provide and
substantiate assumptions with market reports and/or field data where possible. A
similar approach should be taken for the deployed property lifetime. Specifically,
if reference data from Section H is not used, the applicant should cite life-cycle
performance data of previously deployed, comparable property. Provided below
are equations and examples corresponding to each type of SAEP which can be
used as high level guidance when calculating AAMC.

<!-- PageBreak -->

Electricity Generation: For SAEP used to produce energy from the sun, wind,
geothermal, or other renewable resources, the following formulas shall be used
to estimate the electricity generation attributable to property produced at the
proposed facility. Specifically, the AAMC is the kWhs generated which can be
attributed to one year's worth of production from the proposed project:

AAMC

WRank
Year

×

(
Fractional
System
Contribution

)

X
C

Capacity
Factor
x

Deployed
Property
Lifetime

CoTTE
Where:

(

Fractional
System
Contribution

ManufacturingCosts + SalesMargin

=

TotalS ystemHardware Price

x

Percentage
SAEP

And:
Capacity
Factor
1
\=
AnnualEnergyOutput(own Ac)

PeakPowerRating X 8760hrs

Example:

A photovoltaic company is building a "50 MW" crystalline silicon solar cell
manufacturing line. 50 MW is input as the first term "Wpeak production per year"
which is the annual peak power output of property produced from the
manufacturing line. This 50 MW number is multiplied by a series of terms to
produce an AAMC that represents the true lifetime electricity generation from this
property after it is deployed.

The second term, "Fractional System Contribution" is used to discount the
50 MW by the solar cell's fraction of a solar system's total value. In this example,
the company purchases silicon wafers and other consumable materials and
processes them into a functional cell. The Fractional System Contribution
represents the added value that the manufacturing process adds to the final
system price. If the market value of a wafer and consumables is $1/Wp, the cells
are sold for $1.50/Wp, and the total factory gate price of the entire photovoltaic
system (including the inverter and balance of system components) is $5/Wp, then
the Fractional System Contribution is (1.5-1)/5=10%. Note: in this example,
100% of the product manufactured by the solar cell line is allocated for SAEP. If
instead, some fraction of the rated 50 MW capacity was allocated for an
application other than SAEP, then the "Percentage SAEP" would be reduced
from 100% to account for this diverted product stream.

The third term, "Capacity Factor" is used to calculate the ratio of annual
energy produced to the total energy implied by the peak power rating of the
manufactured property. In this example, the power output of the cells are

<!-- PageBreak -->

reduced slightly when they are incorporated into a module and reduced further
when the DC power from the module is converted to useable AC power via an
inverter. Additionally, the modules are projected to degrade over their deployed
lifetime. The actual average annual energy output of the system over its lifetime
is determined by these reductions and the annual solar insulation or resource
which is typical of current installations.

The fourth term, "Deployed Property Lifetime", is the anticipated hours of
operation of the manufactured property over its lifetime (after being incorporated
into an end of supply chain component or system). In this example, the end of
supply chain component is a photovoltaic module which may have a lifetime of
30 years. Thus the Deployed Property Lifetime would be 219000 hours (30
years multiplied by 8760 hours per year). Note: if the end of supply chain
component property was instead, a PV inverter, then the Deployed Property
Lifetime would be the expected lifetime, as evidenced by warranty or field data,
of the inverter not the PV system. If the potential lifetime of the end of supply
chain component is longer than the expected lifetime of the generation system,
then the Deployed Property Lifetime should be equal to the expected system
lifetime.

Energy Conservation: For SAEP designed to conserve energy, such as
advanced building, smart grid, or industrial technologies, the following formulas
shall be used to estimate the energy saved which is attributable to the
incorporation of the property produced at the proposed facility. Specifically, the
AAMC is the kWhs saved which can be attributed to one year's worth of
production from the proposed project:

AAMCO:A)

#Units
x

Fractional
Component
Contribution

JA
x

AnnualEnergy Sonings
X

Deployed
Property
Lifetime

Year

Vnit

Where:
(

Fractional
System
Contribution

M
\- (

x
Percentage
SAEP

Total Price of Ef ftoctency Component

And:

Annual Energy Savings
\=
Unit
(

Annual Baseline
System
Consumption

)
\-

Annual
Improved System
Consumption

Example:

A heating, ventilating, and air conditioning (HVAC) equipment supplier is
re-equipping a factory for the manufacture of advanced condensers. The re-

<!-- PageBreak -->

equipping will enable 10,000 advanced condensers to be manufactured annually.
This number will be input as the first term "# Units per year." For the equations
used above, the condenser could represent a sub-component of an advanced
HVAC "component" (the complete collection of sub-components required to
enable the conservation of energy, e.g., an advanced air handler, controller,
packaging unit, etc). Alternatively, if the condenser alone provides the full energy
conservation benefit and can be integrated with traditional HVAC systems in a
straightforward manner, then the condenser would be the "component". In either
case, the energy consuming "system" is the entire energy load which is directly
impacted by, and fully encompassing of the energy conservation benefit. For this
example, the system is simply a building.

The second term, "Fractional Component Contribution" is used to
calculate the value fraction of an end of supply chain component that the
manufactured condenser comprises. In this example, the company purchases
supplies (fans, tubing, etc.) and materials (sheet metal, solder, etc.) to assemble
a functional condenser. The "Fractional Component Contribution" represents the
added value that the manufacturing process adds to the final component price. If
the market value of the supplies and materials is $100 per unit, the controller
assembly is sold to downstream manufacturers for $200, and the total "factory
gate" price to a HVAC installer of the entire HVAC component is $2000, then the
"Fractional Component Contribution" is (200-100)/2000 = 5%. Note: if for
example, 20% of the units manufactured were used in a different system where
there was no energy conservation benefit, then the "Percentage SAEP" term
would be 80% and the "Fractional Component Contribution" would be further
reduced accordingly.

The third term, "Annual Energy Savings per Unit" is used to calculate the
annual energy savings which is enabled by incorporating only the component into
a system and assuming typical climate and operation. In this example, the
electricity consumption of the building may be decreased by 5000kWh per year.

The fourth term, "Deployed Property Lifetime", is the anticipated years of
operation of the manufactured property over its lifetime. In this example, the
anticipated years of operation should equal the warranty on the entire HVAC unit.
Note: if the sub-component lifetime is shorter than the expected lifetime of the
component, then the sub-component lifetime should be used for the "Deployed
Property Lifetime". The lifetime of the sub-component cannot be longer than the
lifetime of the component or system in which it is installed.

Fuel Efficiency: For SAEP which increases fuel efficiency, such as a hybrid-
electric or plug-in electric drive motor vehicle, the following formulas shall be
used to estimate the annual energy saved which is attributable to the
incorporation of the property produced at the proposed facility. Specifically, the
AAMC is annual fuel savings which can be attributed to one year's worth of
production from the proposed project:

<!-- PageBreak -->

AAM CEGE

#Units
yr

Fractional
Component
Contribution

Annuel Fuel Savings
X

Deployed
Property
Lifetime

×

X

Unit

Where:

Fractional

Component

Unit Manufacturing Cost + Untt Sales Margin

X
Percentage
SAEP

Contribution

Total Price of Efficiency Component

And:

Annual Fuel Savings

Annual Baseline
System
\-

Annual Impoved
System
Consumption

Unit

Consumption

Example 1:

An automobile supplier is expanding a factory for the manufacture of
hybrid-electric controller assemblies. The expansion will enable 10,000
additional controllers to be manufactured annually. This number will be input as
the first term "# Units per year." For the equations used above, the controller
could represent a sub-component of a hybrid drive train "component" (the
complete collection of sub-components required to enable the efficiency
improvement, e.g., a controller, battery, and electric motors). Alternatively, if the
controller alone provides the full fuel efficiency improvement and can be
integrated with a traditional powertrain, then the controller would be the
"component". In either case, the fuel consuming "system" is the entire load which
is directly impacted by, and fully encompassing of the fuel efficiency
improvement. For this example, the system is simply the vehicle.

The second term, "Fractional Component Contribution" is used to
calculate the value fraction of an end of supply chain component that the
manufactured controller assembly comprises. In this example, the company
purchases supplies (PCBs, power controllers, etc.) and materials (adhesives,
wiring, etc) to assemble a functional controller. The "Fractional Component
Contribution" represents the added value that the manufacturing process adds to
the final component price. If the market value of the supplies and materials is
$500 per unit, the controller assembly is sold to downstream manufacturers for
$1000, and the total "factory gate" price to an automobile manufacturer of the
entire hybrid electric component is $4000, then the "Fractional Component
Contribution" is 12.5%. Note: if, for example, 10% of the units manufactured
were allocated instead for electric golf carts (non-SAEP) then the "Percentage
SAEP" term would be 90% and the "Fractional Component Contribution" would

<!-- PageBreak -->

be further reduced accordingly.

The third term, "Annual Fuel Savings per Unit" is used to calculate the
annual fuel savings which is enabled by incorporating only the component into a
system under typical use patterns. In this example, the fuel economy of the
vehicle may be increased by 10 miles per gallon. The actual annual fuel savings
would be determined by this increase in fuel economy and the annual vehicle
miles traveled, for which the applicant should provide cited data. For alternative
fuels such as diesel, savings should be converted to gallons of gasoline
equivalent (GGE). For electric vehicle (EV) or plug-in hybrid electric vehicle
(PHEV) systems, where electricity is consumed to further reduce the fuel
consumption, an additional calculation of MWh consumed per GGE saved is
required in the calculation of CO2 emissions. See further instructions under
"Impact on Air Pollution and Anthropogenic Emissions of Greenhouse Gases".

The fourth term, "Deployed Property Lifetime", is the anticipated years of
operation of the manufactured property over its lifetime. In this example, the
anticipated years of operation should be substantiated by citing fleet lifetime of
previously deployed comparable systems. Note: if the sub-component lifetime is
shorter than the expected lifetime of the system, then the sub-component lifetime
should be used for the "Deployed Property Lifetime". For example, if the
subcomponent was a battery for an electric vehicle then the anticipated lifetime
might be the warrantied lifetime of the battery rather than the anticipated lifetime
of the vehicle. The lifetime of the sub-component cannot be longer than the
lifetime of the component or system in which it is installed.

Example 2:

A manufacturer of reciprocating engines is building a new factory to
manufacture a new, high-efficiency engine for use in Combined Heat and Power
(CHP) systems. CHP applications are included in "fuel efficiency" for purpose of
this notice because they consume energy in the production of electricity and
thermal energy.8

The new factory will enable 1,000 high-efficiency engines to be
manufactured annually. This number will be input as the first term "# Units per
year". For the equations used above, the reciprocating engines could represent
a sub-component of a CHP "component" (the complete collection of sub-
components required to enable the efficiency improvement - e.g., fuel handling,
thermal recovery unit, integrated controls, etc). The energy consuming "system"
is the entire energy load which is directly impacted by, and fully encompassing of
the efficiency improvement. For CHP, the system may be an industrial building,
hospital or other building.

The second term, "Fractional Component Contribution" is used to

8
Although the energy source for a CHP system may be renewable (e.g., landfill gas), the CHP system
displaces thermal energy production (e.g., a boiler) that would typically use fossil fuel. Because fossil
energy consumption is displaced by the CHP system, the "fuel efficiency" analysis is used.

<!-- PageBreak -->

calculate the value fraction of an end of supply chain component that the
manufactured engine comprises. In this example the company purchases
supplies (fuel pumps, tubing, etc) and materials (engine blocks, wire, etc) to
assemble a completed engine. The "Fractional Component Contribution"
represents the added value that the manufacturing process adds to the final
component price. If the market value of the supplies and materials is $40,000
per unit, the controller assembly is sold to downstream manufacturers for
$100,000, and the total "factory gate" price to an engineering firm of the complete
CHP system $150,000, then the "Fractional Component Contribution" is
(100,000-40,000)/150,000 = 40%. Note: if for example, 25% of the units
manufactured were used in a different system where there was no efficiency
improvement or the system does not qualify as SAEP, then the "Percentage
SAEP" term would be 75% and the "Fractional Component Contribution" would
be further reduced accordingly.

The third term, "Annual Energy Savings per Unit" is used to calculate the
annual energy savings which is enabled by incorporating only the component into
a system and assuming typical climate and operation. In this example, the CHP
system saves energy by displacing electricity from the grid and onsite thermal
energy generation that would be generated by a boiler or other device. The net
annual energy savings is the energy that would be consumed by grid generated
electricity plus the energy that would be consumed by the onsite boiler minus the
energy consumed by the CHP system. This net energy should be expressed in
terms of gallons of gasoline equivalent using the conversion factors provided in
the Applicant Data Input Spreadsheet.

The fourth term, "Deployed Property Lifetime", is the anticipated years of
operation of the manufactured property over its lifetime. In this example, the
anticipated years of operation should equal the warranty on the entire CHP
system. Note: if the sub-component lifetime is shorter than the expected lifetime
of the system, then the sub-component lifetime should be used for the "Deployed
Property Lifetime". The lifetime of the sub-component cannot be longer than the
lifetime of the component or system in which it is installed.

GHG Emission Reduction: For SAEP with the primary purpose of reducing
emissions or sequestering GHG, the following formulas shall be used to estimate
the annual emission reduction in CO2 equivalent gases. Specifically, the AAMC
is the Mtons of avoided CO2 equivalent gas emission which can be attributed to
one year's worth of production from the proposed project.

AAMC(Nome COare)

#Units

Fractional
Component
Contribution

Deployed
Property
Lifetime

Year
x

×

fOp สดุ.กิกส์พระเอก

x

Where:

<!-- PageBreak -->

Fractional
System
Contribution

Wirth Wany f neturin e Costs+ UnitateaWang in
Total Cost of Emmissions Reduction Component

Percentage
SAEP

And:

Reduction

(
1

Annual Baseline
CO
Emissions

Annual
)-(Improved CO2;
Emissions

)-(

)

Unit

Example:

A chemical supplier is building a factory for the manufacture of physical
solvents for CO2 capture. The factory will produce 100,000 gallons of solvent.
This volume will be input as the first term "# Units per year." For the equations
used above, the physical solvent would represent a sub-component of a CCS
"component" (the collection of sub-components required for the full Carbon
Capture and Sequestration (CCS) process). The "system" is the entire carbon
emitting facility which is directly impacted by, and fully encompassing of, the CCS
process.

The second term, "Fractional Component Contribution" is used to
calculate the value fraction of an end of supply chain component that the
manufactured solvent comprises. In this example the company purchases
feedstock materials to process the solvent. The "Fractional Component
Contribution" represents the added value that the manufacturing process adds to
the final component price. If the feedstock costs $50 per unit volume, this
volume is sold to downstream manufacturers for $500, and the total "factory
gate" price of a functional CCS apparatus is $5000 (per unit volume), then the
"Fractional Component Contribution" is (500-50)/5000 = 9%. Note: if, for
example, 30% of the annual manufactured volume was sold for non-CCS
applications then the "Percentage SAEP" term would be 70% and the "Fractional
Component Contribution" would be further reduced accordingly.

The third term, "CO2eq Reduction per Unit" is used to calculate the annual
CO2eq reduction which is enabled from incorporating only the full CCS component
into a system under typical use patterns. In this example, the system emissions
will be reduced by 1000 Mtons per year per unit.

The fourth term, "Deployed Property Lifetime", is the anticipated years of
operation of the manufactured property over its lifetime. In this example, the
anticipated years of operation should be substantiated by providing information
on likely solvent replacement schedules. Note: if the sub-component lifetime is
shorter than the expected lifetime of the component, then the sub-component
lifetime should be used for the "Deployed Property Lifetime". The lifetime of the
sub-component cannot be longer than the lifetime of the component or system in
which it is installed.

<!-- PageBreak -->

Renewable Fuel Refining or Blending: For SAEP to be used exclusively in the
refining or blending of renewable fuels, the following formulas shall be used to
estimate the production of renewable fuel which is directly attributable to the
annually manufactured property. Specifically, the AAMC is the renewable fuel
generation which can be attributed to one year's worth of production from the
proposed project:

AAMC(cad)

#Vitts

Capacity
Vimit

Fractional
Component
Contribution

Deployed
Property
Lifetime

x

x

Ìx

Where:

(
)
\=

Fractional
System
Contribution

(
ManufacturingCosts + SalesMongi
Total installed System Price

X
Percentage
SAEP

Example:

A pump manufacturer is building a factory for the manufacture of pumps
specifically designed for renewable fuel refining or blending. The factory will
produce 10,000 pumps per year. This volume will be inputted as the first term "#
Units per year."

The second term, "Capacity per Unit" is the estimated annual volume of
fuel refined or blended annually, which is enabled by the pump under typical
plant operations. For example, if a single pump is installed per biofuel refinery,
the enabled capacity is the annual refined or blended product from the biofuel
refinery.

The third term, "Fractional System Contribution" is used to calculate the
value fraction of an end of supply chain system that the manufactured pump
comprises. In this example the company purchases sub-components and
materials to manufacture each pump. The "Fractional System Contribution"
represents the added value that the manufacturing process adds to the final
component price. If the sub-component and materials cost $5000 per pump, this
pump is sold to a construction company for $10,000, and the total price of the
constructed refinery, the "system," is $1M, then the "Fractional Component
Contribution" is (10,000-5000)/1,000,000 = 0.5%. Note: as per the requirement
that no portion of such a project be used for the refining or blending of non-
renewable fuels, the "Percentage SAEP" term must be equal to 100% for such
SAEP.

The fourth term, "Deployed Property Lifetime", is the anticipated years of
operation of the manufactured property over its lifetime. In this example, the
anticipated years of operation should equal the anticipated lifetime based on the
planned service schedule or warranty. The lifetime of the component cannot be

<!-- PageBreak -->

longer than the lifetime of the system in which it is installed.

Other Advanced Energy Technologies: For other technologies with the primary
benefit of storing or transmitting renewable energy, applicants should quantify the
annual renewable energy generated and/or saved which is directly attributable to
the manufacture of their technology discounted by the likely fraction of their
annual production which will be used for this purpose. Although no generic
equations are provided for this technology area, applicants should review the
equations and methodology above and transparently employ analogous
calculations where possible and appropriate.

Impact on Air Pollution and Anthropogenic Emissions of Greenhouse Gases:

The DOE anticipates a wide variety of manufacturing proposals and thus no
standard, all-encompassing approach will be used to calculate pollutants and
GHG emissions. Instead, the applicant is expected to quantify or discuss the
pollutant and/or GHG emissions associated with the full value chain manufacture,
installation, operation, and end-of-life processes associated with the SAEP
attributable to the project.

To quantify the primary effects on CO2 emissions ("AAMC CO2 Reduction" as
listed in the Applicant Data Input Spreadsheet), the following four technology-
specific approaches are used.

For Electricity Generation and Energy Conservation SAEP, the following
equation is used to calculate the reduction in emissions of CO2 from the AAMC:

Reduced

Emissions

X
0.606M tons
MWh
WE Are

This calculation ignores CO2 emissions associated with the manufacture,
installation, and end-of-life processes and assumes that the dominant impact
with respect to CO2 emissions is the offset consumption of average U.S. grid
electricity. Where possible, the applicant is expected to quantify or discuss CO2
emissions associated with the full value chain manufacture, installation,
operation, and end-of-life processes associated with the SAEP attributable to the
project. The rationale for requiring a full value chain assessment is to prevent
the review process from advantaging the lowest energy manufacturing steps
when all value chain steps are required to realize any CO2 reduction.

For most Fuel Efficiency SAEP, a similar equation is used:

<!-- PageBreak -->

Reduced CO, Emtenions - AAMCOOs X
☒
GGE
0.0088 Mtons

As with the previous energy types, applicants should, where possible, discuss
the full value chain, life cycle emissions of CO2 associated with their
manufactured property.

For Fuel Efficiency SAEP, such as EVs and PHEVs, which require the
consumption of electricity to enable the full fuel efficiency, the following equation
is used:

Reduced CO2 Emissions

= AAMC
GGE
X
0.0088 Mtons
galGGR
TC

MWh

×
C
0.606MtonD

1

\-

GGR

MWh.

The "MWh/GGE" term is calculated by the applicant. As with the previous energy
types, applicants should, where possible, discuss life cycle emissions of CO2
associated with their manufactured property.

For Renewable Fuel Refining or Blending SAEP, the calculation is modified to
account for CO2 emissions associated with the manufacture of renewable fuel:

0.0088 Mtons

Reduced CO. Emissions

AAMCOCE
×
☒

galGGE

saved
\-
GGE
MWh

ECA

The "LCA" term is determined by the applicant by selecting the most relevant fuel
and corresponding process from the "LCA Fuel CO2 Assumptions" tab.
Applicants must select the life cycle analysis (LCA) number which most closely
corresponds to their SAEP. If the applicant believes that the actual LCA
emissions associated with the operation of the SAEP differs significantly from
data provided, then the applicant may substantiate an alternative LCA number in
their narrative. No further discussion regarding CO2 emissions are required
because emissions associated with installation, operation, and end-of-life
processes associated with the SAEP are encompassed by the LCA number.

For GHG Emission Reduction SAEP, the AAMC is equivalent to the CO2
emission reduction and thus no additional calculations are necessary.

The AAMC CO2 Reduction represents the total CO2 impact over the lifetime of
deployed property which is attributable to one year of manufacturing. This
number is further adjusted in three ways to assess the magnitude of the CO2
reduction of a given project. First, the normalized value of this reduction is

<!-- PageBreak -->

assessed by dividing by the tax credit sought. Second, the normalized AAMC
CO2 Reduction is then divided by the deployed property lifetime to capture the
CO2 impact after the first year of SAEP deployment. Third, the normalized
AAMC CO2 Reduction is multiplied by the projected factory lifetime. This number
calculates the total carbon impact over the lifetime of all deployed property over
the lifetime of the factory. Because this number will scale with the factory
lifetime, the applicant should justify the claimed operational period of the factory
in the project narrative. All of these three AAMC CO2 Reduction figures will be
used in the scoring of Evaluation Criteria 2.

# Technological Innovation and Cost Reduction:

Applicants must provide quantitative information regarding their project's
innovation and value. This information is captured with the related metrics of
technological or cost advantage over competitors, levelized cost, and the cost of
CO2 abatement. The preferred approach is for the applicant to discuss and
quantify each of these three metrics. However, DOE recognizes the difficulty
associated with calculating levelized costs (and thus $/CO2) for many types
eligible property. If the applicant is unable to perform a levelized cost or CO2
abatement cost calculation for the SAEP then the applicant should provide a
quantitative or quantitative assessment of how their technological or cost
advantage over competitors translates into system price savings, improved
performance, or improved system life.

Technological or Cost Advantage over Competitors: The applicant data sheet
requires applicants to identify their "Technological or Cost Advantage over
Competitors" with respect to the most relevant figure of merit. Ideally this is an
apples-to-apples comparison between similar property of similar function. For
example, a wind blade manufacturer might compare the performance and cost of
the proposed blade manufacturing to current commercially manufactured blades.
Although high level metrics such as levelized costs can capture this cost
advantage, applicants are encourage to select a lower level metric (i.e. $/W,
$/Unit, efficiency, etc.) and later discuss the impact this granular cost advantage
has upon the levelized cost. If the applicant's manufactured property has
multiple advantages over currently manufactured property, the applicant should
select and quantify the most significant advantage in the Applicant Data Input
Spreadsheet while discussing all technological and cost advantages in their
narrative.

Levelized Cost: The levelized cost of energy (LCOE) calculation should assume
that the manufactured property is part of the SAEP and where appropriate, be
based on the financial and resource assumptions provided in Section H. This
"improved" LCOE value should be expressed in nominal terms and should not

<!-- PageBreak -->

include any Federal, State or other financial incentives. Further, plant and
related cost values and prices of commodity fuels or feedstocks used in the
calculation should reflect current national wholesale averages where possible.
The following information should be provided as documentation:

· Brief description of the methodology used as the basis for the calculation.
This methodology should be a commonly accepted industry standard.

· Identification and brief rationale for the source of key values used in the
calculation, including capital or first costs, operating and maintenance
costs, and prices of commodity fuels or feedstocks.

· Justification for any use of a resource-related parameter (e.g., capacity
factor) different than the national averages provided.

· Explanation of any factors impacting the levelized cost that could not be
quantified and included in the calculation, and their potential directional
effect on the resulting cost (i.e., increase or decrease).

· Explanation of any relationship between the cost of the manufactured
property and the performance of the end use energy product.

· If possible, an "unimproved" levelized cost calculation that does not reflect
the input of the manufactured property (e.g., relies on the competitive
standard of the day), based on the same financial and resource
assumptions used in the "improved" calculation.

Cost of Abatement: The form and units of the levelized cost vary across each
energy type in the Applicant Data Input Spreadsheet. Thus, the cost of
abatement equations are specific to each energy type to ensure consistent,
accurate and comparable abatement costs are produced by the Applicant Data
Input Spreadsheet. For all energy types the cost of abatement reflects the
incremental cost and associated incremental reduction in carbon emissions from
a baseline.

For Electricity Generation and Efficiency technologies the cost of abatement is
calculated with the following equation:

$
= 10 X

KWh

improved

RWE
baseline

Mtonco.

MWh.
Grid

The baseline c/kWh is defined by the retail electric rate of the electricity being
generated or saved (i.e. residential, commercial, or utility). The factor of 10 in the
numerator provides dimensional consistency. For simplicity, all improved
technologies are assumed to non-carbon emitting.

For Fuel Efficiency technologies the cost of abatement is calculated with the

<!-- PageBreak -->

following equation:

Incremental levelized cost / incremental emissions reduction:

Mtonce,
8

=

8
GGE

Incremental

Atonsco

GGE

In this calculation, an incremental LCOE term is used to simplify the applicant's
data entry into the Applicant Data Input Spreadsheet. This term represents the
difference in LCOE ($/GGE) costs between the baseline system and the
improved system. The specific calculation of this difference or increment will
vary depending upon the fuel efficiency technology being considered. The
denominator represents the emissions reduction associated putting the improved
system in place, principally in terms of its displacement of the baseline
technology.

For example, for a vehicle fuel efficiency technology, the incremental LCOE
($/GGE) may be calculated as:

$

=

Incremental

MINNA
H+
mile
5
Improved
\-

5

mike

mitte

Baseline

In this case the $/Mile term represents the fully-burdened cost associated with
each mile driven and includes factors such as depreciation. To calculate the
incremental $/GGE, the applicant calculates the difference between baseline and
improved $/GGE. The denominator of the cost of abatement term is based on
the "well to wheels" emissions associated with burning a GGE of the consumed
fuel. Applicants should show their work and reference Section H when
calculating these values.

For other fuel efficiency technologies, such as a CHP application, the incremental
LCOE ($/GGE) may be calculated as:

$

$

×
BTU
GGE BTU GGE
\=

In this case, the $/BTU term represents the fully-burdened cost associated with
each BTU of heat that the CHP system generates as a by-product of the power
generation. The cost of abatement denominator reflects the emissions avoided
as a result of the reduced consumption of the fuel that would have be burned to

<!-- PageBreak -->

generate the heat now supplied by the CHP system.

For GHG Reduction technologies the cost of abatement is equivalent to the
levelized cost (i.e., for these technologies, the levelized cost is already
expressed as the cost abatement) and thus no additional calculations are
necessary.

For Renewable Fuel Refining or Blending technologies the cost of abatement
calculation is analogous to the Electricity equations provided above:

S

$

S
GGE

refined
\-
GGE

traditional

Mtonco.

=

Mtonsco

Mtonsco

GGE

GGE

In this case the traditional fuel is the fossil fuel not consumed. The term
"Mtons/GGEtraditional" in the denominator is similar to the denominator term in the
fuel efficiency example provided previously. The second term in the denominator
"Mtons/GGErefined" accounts for the life-cycle ("seed to wheels") carbon emissions
associated with consumption of the renewable fuel. This value is referenced
from the "LCA Fuel CO2 Assumptions" tab based upon the applicant's renewable
fuel type selection.

If an applicant cannot reasonably calculate a LCOE for the SAEP associated with
the proposed manufactured property, the applicant can instead provide an
estimated cost of GHG emissions abatement. The applicant should provide and
justify the use of a cost value from a published study (e.g., Mckinsey's published
2009 report estimating global abatement costs) for a comparable energy system.

If the applicant chooses to calculate a cost of abatement without a corresponding
LCOE value for the SAEP, the basis of the calculation is similar to that required
in the LCOE calculation. For example, an applicant could calculate an
incremental LCOE by calculating the net present value of the incremental cost to
the baseline system and dividing by the net present value of the incremental
performance improvement. This calculation should also be based on the
financial and resource assumptions provided and should be expressed in
nominal terms and should not include Federal, State or other financial incentives.
Further, plant and related cost values and prices of commodity fuels or
feedstocks used in the calculation should reflect current national wholesale
averages where possible. The following information should be provided as
documentation:

· Explanation of why an LCOE value either could not be calculated or
was not appropriate to calculate for the end use energy product.

<!-- PageBreak -->

· Brief description of the methodology used as the basis for the
calculation. This methodology should be a commonly accepted
industry standard.

· Identification and brief rationale for the source of key values used in
the calculation, including capital or first costs, operating and
maintenance costs, prices of commodity fuels or feedstocks, and
carbon emissions associated with the operation of the end use energy
product

· Identification and brief rationale for the key values associated with the
baseline energy mix, including the cost of generation and carbon
emissions.

· Explanation of any factors impacting the cost of abatement that could
not be quantified and included in the calculation, and their potential
directional effect on the resulting cost (i.e., increase or decrease).

· Explanation of any relationship between the cost of the manufactured
property and the performance of the end use energy product.

· If possible, an "unimproved" cost of abatement calculation that does
not reflect the input of the manufactured property (e.g., relies on the
competitive standard of the day), based on the same financial and
resource assumptions used in the "improved" calculation.

Finally, if the applicant chooses to provide a cost of abatement value for the
closest comparable end use energy product from a published study, the following
information should be provided as documentation:

· Explanation of why an LCOE value either could not be calculated or was
not appropriate to calculate for the end use energy product.

· Brief description of the methodology used in the cited study.

· Identification of key assumptions used in the study, including the year
basis for which the cost is reported (if the cost is reported in real terms;
e.g., $2008), the year of costs and prices of fuel commodities, the year to
which the end cost value is referenced (e.g., could be a future year), the
extent of technology improvement assumed for the comparable end use
energy product, the regional extent of the baseline assumed (e.g., global,
U.S., region of U.S.), the carbon emissions associated with the baseline
energy mix and the end use energy product, the key financial assumptions
(e.g., interest rates, taxes, incentives included), and the resource-related
parameters (e.g., capacity factors).

· Explanation of how the above assumptions differ from those provided
above for guiding the calculation of the cost of abatement, and the
potential directional effect of these differences on the study's cost value
(i.e., if the aforementioned assumptions required for cost of abatement

<!-- PageBreak -->

calculation had been used, would the study's cost value likely have
increased or decreased).

## V. SUPPORTING DOCUMENTS

The applicant should include such appendices as are applicable to the project.
Examples of appropriate appendices include:

· Copy of internal or external engineering reports.

· Copy of site plan, together with evidence that applicant owns or controls a
site. Examples of evidence would include a deed, or an executed contract to
purchase or lease the site.

· Lists of all Federal, State, and local permits, including environmental
authorizations or reviews, necessary to commence construction.

· Information supporting applicant's conclusion that the site is fully acceptable
as the project site for a manufacturing facility and for its intended use.

· A business plan which provides a description of the proposed project.

· A financial plan for the proposed project.

· Financial statements for the applicant and other project funding sources for
the most recently ended three fiscal years, and the unaudited quarterly
interim financial statements for the current fiscal year.

· Expressions of interest or commitment letters from equity and debt financing
sources.

· Expressions of interest or commitment letters from potential customers.

· Off-take agreements.

<!-- PageBreak -->

### H. Technical References for Advanced Energy Technologies Supplied Figures

This section is provided to assist the applicant in calculating the quantitative
factors required in the project proposal. Wherever appropriate, the applicant
should use this information for baseline assumptions for estimating factors such
as the annual performance of the SAEP, expected lifetime of the deployed
property and LCOE property. Additionally, in the event that the applicant is
unable to calculate the levelized cost or the cost of abatement, this information
may be used as inputs to the Applicant Data Input Spreadsheet.

Table 1: Financial Assumptions for Levelized Cost of Energy Analysis Common Financial Inputs for LCOE Analysis by Market Sector

Market

Buildings (grid-tied)

Central Generation

Residential

Commercial

Utility

Financials

Residential Mortgage

Commercial Loan

IPP and Utility

General

Analysis Period

20

20

20

Inflation Rate

2.5%

2.5%

2.5%

Real Discount

Rate

5.5%

5.5%

7.5%

Taxes &amp; Insurance

Federal Tax

29%

35%

35%

State Tax

7%

7%

8%

Property Tax

0

0

0

Sales Tax

0

0

0

Insurance

0

0

0

Depreciation

Federal

N/A

MACRS-Mid-Q

MACRS-Mid-Q

State

N/A

MACRS-Mid-Q

MACRS-Mid-Q

Loan

Loan (Debt)

Percent

100%

50%

50%

Loan Term

30

15

20

Loan Rate

6%

6%

6%

Constraining Assumptions

PPA Escalation

N/A

N/A

Rate

0

Target Internal Rate of Return

N/A

N/A

15%

<!-- PageBreak -->

Target Minimum Debt Service

N/A

1.4

N/A

Coverage Ratio

Positive Cash Flow

N/A

N/A

No

Incentives

Federal, State, or Local Subsidies

Do not include

Do not include

Do not include

Suggested LCOE Tools:

All Electricity Generating Technologies (general tool):

RET Finance: http://analysis.nrel.gov/retfinance/

The NREL Strategic Energy Analysis Center launched RET Finance in October
2001. It is an Internet-based cost of electricity model that simulates a 30-year
nominal dollar cash flow for a variety of renewable energy power projects. As an
online application, RET Finance is accessible from anywhere using an Internet
connection and a browser. RET Finance calculates project earnings, detailed
cash flows, and debt payments and also computes a project's levelized cost-of-
electricity, after-tax internal rate of return, and debt service coverage ratio.

Solar Technologies

SAM 3.0.3.0: https://www.nrel.gov/analysis/sam/

The National Renewable Energy Laboratory (NREL), in conjunction with Sandia
National Laboratory and in partnership with the U.S. Department of
Energy (DOE) Solar Energy Technologies Program (SETP), developed the Solar
Advisor Model (SAM) in 2006. This version was last updated on July 24, 2009.
The Solar Advisor Model evaluates several types of financing (from residential to
utility-scale) and a variety of technology-specific cost models for several (and
eventually all) SETP technologies. The SETP technologies currently represented
in SAM include concentrating solar power (CSP) parabolic trough and dish-
stirling systems and photovoltaic (PV) flat plate and concentrating technologies.
Other technologies will be added in future versions, including CSP central
receivers and residential solar water heating.

Geothermal Technologies

Geothermal Electricity Technology Evaluation Model (GETEM): Posted on-
line since July 31, 2009: http://www1.eere.energy.gov/geothermal/getem.html.
The Geothermal Electricity Technology Evaluation Model (GETEM) was
developed to aid the Geothermal Technologies Program (GTP) in understanding
the performance and the cost of the technologies it is seeking to improve. It is a
detailed model of the estimated performance and costs of currently available

<!-- PageBreak -->

U.S. geothermal power systems. GETEM can be used to analyze and evaluate
currently available technologies and it can also be used to estimate what certain
technologies might cost five to twenty years in the future, given the direction of
potential RD&D projects. The model is intended to help GTP determine which
proposed RD&D programs and projects might offer the most improvements for
the taxpayer dollar.

#### Small Wind Technologies www.nrel.gov/wind/docs/spread sheet Final.xls

Global Cost of Measured Reduction in Greenhouse Gas Emissions
Applicants may choose to use published report such as the Mckinsey and
Company. "Pathways to a Low-Carbon Economy." Version 2 of the Global
Greenhouse Gas Abatement Cost Curve (2009). The report can be downloaded
here:
http://www.mckinsey.com/clientservice/ccsi/pathways low carbon economy.

asp
(Based on Costs of the Full Supply Chain)9.

Table 2: Vehicle Assumptions

Metric

Value

Units

Annual Miles Traveled

12,000

Miles

Vehicle Lifetime Miles

160,000

Miles

2008 Average US Gasoline Price

$3.26

$

Baseline Vehicle Fuel Economy

23.4

mpg

Vehicle Cost

$23,337

$

Table 3: Common Service Life Years

Technology

Service Life Years

Solar Photovoltaics

30

Fuel Cell

20

Heat Pumps

7 to 20

Electric Water Heaters

20

Natural Gas Engine

20

Oil-Fired Engine

20

Natural Gas Turbine

20

NG Micro Turbine

20

9 Baseline data and abatement potential can differ slightly between this referenced global abatement
study and the national studies previously published by Mckinsey. National studies provide a deeper view
of the specifics of each respective country and to a much larger extent rely on national baseline data and
other national statistics. Also, in national studies additional levers are included which are particularly
relevant in that country.

<!-- PageBreak -->

Wind

30

Electric Rooftop Heat Pump

15

Ground-Source Heat Pump

20

Suggested for non-distributed technologies

20

Assumption Tables to the EIA AEO, March 2009.
http://www.eia.doe.gov/oiaf/aeo/assumption/index.html

Table 4: Other Common Technical Assumptions and Baseline for Levelized
Cost of Energy Analysis
Electricity Generation and Storage

End Use Energy Product (Technology)

Resource Characteristics

Capacity Factor

Biomass (general)

N/A 2

68%

Geothermal

200 deg C; 3000m depth

84%

Landfill gas utilization (general)

N/A

85%

Wind

Class 5

39%

Wind - Offshore

Class 5

42%

Solar Thermal - CSP

Phoenix AZ

32%

Solar Photovoltaic (general)

Phoenix AZ

20%

Storage - CAES

N/A

25%

Storage - Pumped Hydro

N/A

25%

Storage - Adv. Batteries

N/A

25%

Storage - Flywheel

N/A

25%

1 Generation - NREL Analysis estimates based on averages from multiple
published sources; Storage - Input costs from EPRI 2009 Overview of Electric
Energy Storage Options for the Electric Enterprise

2 A constant nominal price of $2.02/million Btu should be assumed to determine
the fuel price contribution to the LCOE.

N/A - not applicable
If a natural gas price is needed to compute the LCOE of at technology, a constant
nominal price of $4.66/ thousand cubic feet should be used (based on EIA AEO
2009).

<!-- PageBreak -->

##### I. 48C Preliminary Application

This preliminary application will enable DOE to preview the types of forthcoming final
applications to ensure that we establish the relevant resources for an efficient and
effective review process. Please provide brief responses summarizing the content in
your final applications. This preliminary application will not be included in the review of
the final application as we understand the final numbers might differ slightly from those
in the preliminary application. However, you must use numbers that are as accurate as
possible, and we would appreciate the data here to be within 10% of the final data.

Applicant Information

Company Name

City

State

Qualified Investment $

Tax Credit Requested (30% of Qualified Investment)

#### Narrative Describing the Scope of the Project (300 words or less)

<!-- PageBreak -->

#### Applicant Checklist

Are you an eligible United States taxpayer?

Yes

No (do not continue with application)

Is your proposed project expected to:

Re-equip a manufacturing facility?

Expand a manufacturing facility?

Establish a manufacturing facility?

Is the manufacturing facility or proposed manufacturing facility in the United States?

Yes

If yes, where is the manufacturing facility located or will the manufacturing facility be located?

City

State

No (do not continue with application)

What is the SAEP that is attributable to your project?

Property designed to be used to produce energy from the sun, wind, geothermal deposits (within the meaning of § 613(e)(2)), or other renewable resources

Fuel cells, microturbines, or an energy storage system for use with electric or hybrid-electric motor vehicles

Electric grids to support the transmission of intermittent sources of renewable energy, including storage of such energy

Property designed to capture and sequester carbon dioxide emissions

Property designed to refine or blend renewable fuels or to produce energy conservation technologies (including energy- conserving lighting technologies and smart grid technologies)

New qualified plug-in electric drive motor vehicles (as defined by section 30D), qualified plug-in electric vehicles (as defined by section 30(d)), or components which are designed specifically for use with such vehicles, including electric motors, generators, and power control units

Other advanced energy property designed to reduce greenhouse gas emissions as may be determined by the Secretary (If other, please specify)

<!-- PageBreak -->

##### J. Applicant Data Input Spreadsheet

This section is provided to give the applicant a depiction of the Applicant Data
Input Spreadsheet, captured in the images on the following pages.

<!-- PageBreak -->

User Input

# Calculated or from other tab Instructions

This worksheet is used to capture quantitative information regarding applicant proposals. Detailed instructions, examples, and reference data are provided
Section G (IV) and Section H of Appendix B. Input data and assumptions should be substantiated in and show clear correspondence to applicant's project
narrative. Applicant should first fill out the relevant user input (green) cells in the Applicant Information section of the Applicant Data Sheet tab. Next, applicant
should fill out user input cells in both the Direct Jobs and Tech Innovation, Cost Reduction tabs. Finally, applicant should verify that all necessary calculations
have been performed as anticipated and are captured in the calculated cells (pink) for each criteria area shown on the Applicant Data Sheet tab. Data will be
extracted from this workbook to compare submission. Therefore no cells, rows, or columns, should be added.

## Applicant Information

Company Name City State Qualified Investment $ Tax Credit Requested $ (30% of Qualified Inv) Energy Type

$ - Click to choose

Technology Area If Other Technology:

Click to choose technology

Used to categorize applications for review process

Product Description (&lt;50 words):

Provide Description Here

Factory Lifetime Deployed property lifetime Date Complete permitting Date Begin Construction Date Begin Production

Years

Years mm/dd/yyyy mm/dd/yyyy mm/dd/yyyy

Levelized Cost (or Incremental Levelized Cost for Fuel Efficiency) Type of Electricity Generation Being Replaced or Saved

Click to choose

Net present value assessment for the cost of technolgy using the financial and resource assumptions (where available) provided in Section H of Appendix B and including life cycle costs as possible. Required for Energy Generation or Energy Efficiency Only - Used to calculate the cost of carbon emission reduction.

Technological or Cost Advantage over Competitors Brief description of cost advantage (&lt;50 words). Full description to be provided in narrative.

Provide Description Here

Provide "figure of merit" unit here

Demonstrated or verified competitiveness over directly comparable technology with respect to most relevant figure of merit (i.e. $/W, ¢/kWh, $/GGE, ¢/BTU, $/Mton CO2, $/sq ft, etc). This number is not used in further calculations.

<!-- PageBreak -->

# Criterion 1: provides the greatest domestic job creation (both direct and indirect) during the credit period (February 17, 2009, through February 17, 2013)

Direct Job Summary

Number of Employees

Jobs/ $1M Tax Credit

FTE

Construction Jobs

262

Operating Jobs

850

Total Direct Jobs

1,112

## Criterion 2: that provide the greatest net impact in avoiding or reducing air pollutants or anthropogenic emissions of greenhouse gases

Electricity Generation

Information

Data

Units

Descriptor (See appendix B for full examples)

AAMC CO2 Reduction AAMC CO2 Reduction/$TC First Years Production CO2 Reduction Total Project CO2 Reduction/$TC

Mtons Mtons/$1M Tax Credit Mtons/$1M Tax Credit Mtons/$1M Tax Credit

Metric tons of CO2 reduction due to the lifetime kWh generated by the attributable annual production of the proposed manufacturing. Example: A solar factory produces 50MW worth of solar cells in one year. "AAMC CO2 Reduction" is the offset emissions due to the attributable energy production of these 50MW over the lifetime of the deployed property. A measure of a project's value in terms of CO2 reductions per tax credit dollar. A measure of a project's CO2 impact during the first year of its property deployment A measure of the total CO2 reduction due to cumulative property production over the life of the manufacturing facility and the life of the deployed energy property.

Electricity Efficiency

AAMC CO2 Reduction AAMC CO2 Reduction/$TC First Years Production CO2 Reduction Total Project CO2 Reduction/$TC

Mtons Mtons/$1M Tax Credit Mtons/$1M Tax Credit Mtons/$1M Tax Credit

Metric tons of CO2 reduction due to the lifetime kWh saved by the attributable annual production of the proposed manufacturing. Example: An manufacturer produces 10,000 condensers annually. "AAMC CO2 Reduction" is the offset emissions due to the attributable energy production of these 10,000 units over the lifetime of the deployed property. A measure of a project's value in terms of CO2 reductions per tax credit dollar. A measure of a project's CO2 impact during the first year of its property deployment A measure of the total CO2 reduction due to cumulative property production over the life of the manufacturing facility and the life of the deployed energy property.

<!-- PageBreak -->

Fuel Efficiency

AAMC CO2 Reduction AAMC CO2 Reduction/$TC First Years Production CO2 Reduction Total Project CO2 Reduction/$TC

Mtons Mtons/$1M Tax Credit Mtons/$1M Tax Credit Mtons/$1M Tax Credit

Metric tons of CO2 reduction due to the lifetime fuel saved by the attributable annual production of the proposed manufacturing. Example: A automotive manufacturer produces 10,000 hybrid controllers annually. "AAMC CO2 Reduction" is the offset emissions due to the attributable energy production of these 10,000 units over the lifetime of the deployed property. A measure of a project's value in terms of CO2 reductions per tax credit dollar. A measure of a project's CO2 impact during the first year of its property deployment A measure of the total CO2 reduction due to cumulative property production over the life of the manufacturing facility and the life of the deployed energy property.

GHG Reduction

AAMC CO2 Reduction AAMC CO2 Reduction/$TC First Years Production CO2 Reduction Total Project CO2 Reduction/$TC

Mtons Mtons/$1M Tax Credit Mtons/$1M Tax Credit Mtons/$1M Tax Credit

Metric tons of CO2 reduction due to the lifetime carbon captured and sequestered by the attributable annual production of the proposed manufacturing. Example: A manufacturer produces 10,000 gallons of a physical CO2 capture solvent annually. "AAMC CO2 Reduction" is the CO2 sequestered due to the attributable production of these 10,000 units over the lifetime of the deployed property. A measure of a project's value in terms of CO2 reductions per tax credit dollar. A measure of a project's CO2 impact during the first year of its property deployment A measure of the total CO2 reduction due to cumulative property production over the life of the manufacturing facility and the life of the deployed energy property.

Renewable Fuel Refinement or Blending

AAMC CO2 Reduction AAMC CO2 Reduction/$TC First Years Production CO2 Reduction Total Project CO2 Reduction/$TC

Mtons Mtons/$1M Tax Credit Mtons/$1M Tax Credit Mtons/$1M Tax Credit

Metric tons of CO2 reduction due to the lifetime fuel produced by the attributable annual production of the proposed manufacturing. Example: A manufacturer produces 10,000 biorefinary pumps annually. "AAMC CO2 Reduction" is the offset emissions due to the attributable energy production of these 10,000 units over the lifetime of the deployed property. A measure of a project's value in terms of CO2 reductions per tax credit dollar. A measure of a project's CO2 impact during the first year of its property deployment A measure of the total CO2 reduction due to cumulative property production over the life of the manufacturing facility and the life of the deployed energy property.

<!-- PageBreak -->

# Criterion 3: that have the greatest potential for technological innovation and

## commercial deployment, as indicated by (i) the production of new or significantly improved technologies, (ii) improvements in levelized cost and performance, and (iii) manufacturing significance and value

Data From Applicant

Data

Units

Project Details

Expected average system lifetime

0 0

Yr Provide "figure of merit" unit here

Cost below competitors

Electricity Generation

AAMC per tax credit $

MWh/yr/$1M

Levelized Cost of Electricity

0.00

¢/kWh

Cost of emission reduction

$/Mton

Electricity Efficiency

AAMC per tax credit $ Levelized Cost of Energy Efficiency

0.00

MWh/yr/$1M ¢/kWh

Cost of emission reduction

$/Mton

Fuel Efficiency

AAMC per tax credit $ Levelized Cost of Fuel Efficiency

0.00

GGE/yr/$1M $/GGE $/Mton

Cost of emission reduction

GHG Reduction

AAMC per tax credit $ Levelized Cost of GHG Reduction

0.00

Mtons CO2eq/yr/$1M $/Mton CO2

Cost of emission reduction

-

$/Mton

Renewable Fuel Refinement or Blending

AAMC per tax credit $ Levelized Cost of Renewable Fuel

GGE/yr/$1M

Refinement or Blending

0.00

$/GGE

Cost of emission reduction

$/Mton

Criterion 4: that have the shortest project time from certification to completion

Milestone

Date mm/ dd/ yyyy

Days to complete milestone

Application Due Date Complete permitting Begin Construction

10/16/2009

Begin Production

<!-- PageBreak -->

### User Input

# Calculated or from other tab Instructions

Please list the direct jobs that will be created during both
construction and operations of your facility. Please be as specific as possible.
Direct Jobs are those jobs represented by the number of people whose work is directly billed to the project.
Do not list Indirect Jobs.
Indirect Jobs are employees in the supply chain who are not included as direct jobs.
Examples include those working for producers of materials, equipment,
and services that are used on the project, such as steel producers, accounting
services or end use installers. The review team will calculate the indirect jobs using a consistent
methodology based on nationwide input/output economic models for advanced manufacturing.

Direct Job Summary

Number of

FTE

Construction Jobs Operating Jobs

- -

## Direct Construction Jobs

Job Category

Annualized

Annualized

Annualized

Annualized

Annualized

FTE

FTE

FTE

FTE

FTE Until

Applicant can determine categories

FY -09

FY - 10

FY-11

FY - 12

02/ 17/ 13

Welder

Carpenter

Foreman

Engineer

Direct Operating Jobs

Job Category

Annualized FTE

Annualized FTE

Annualized

Annualized

FTE

FTE

Applicant can determine categories

FY -09

FY - 10

FY-11

FY - 12

Line Worker

Plant Manager

Office Staff

<!-- PageBreak -->

## User Input Calculated or from other tab Instructions

In order to evaluate the significance of an applicant's manufacturing proposal, the following formulas (or their equivalent) must be used to quantify the Attributable
Annual Manufacturing Capacity (AAMC). AAMC measures the total impact over the lifetime of deployed property which is attributable to one year of manufacturing.
The AAMC will be divided by the total project cost to determine the relative value, per dollar of tax credit, of different project proposals. Finally, the AAMC will be used
to assess production significance and emissions abatement on a per tax credit basis. Information provided below must clearly corespond to applicant's narrative
discussion and which will provide the necessary justifications and verifications of the claimed data inputs below. Further information on these calculations can be found
in section G (IV) of appendix B.

Descriptor

Data

Units

Notes from DOE

Electricity Generation

Annual Peak Power Manufacturing Capacity

MWp/yr

Peak rated power of expected shipped annual production. Use equivalent watts for non-electrical technologies such as solar water heating.

Value added contribution to system resulting by factory production (excludes price paid for feedstock materials, upstream components, etc.).

Manufacturing Costs + Sales Margin

$/W

$/W %

Price to owner of total system hardware including balance of

Total System Hardware Price Typical Annual Capacity Factor

system but excluding installation labor costs Capacity factor for likely technology use and standard resource assumptions. Defined as (annual energy output)/(peak power rating* 8760 hrs). NOTE: "annual energy output" should be calculated by applicant based on average annual resource for a typical installation (see reference tables in Section H of Appendix B)

Deployed Property Lifetime

-

yrs

Number of years the deployed property will operate.

Percent Specified Advanced Energy Property Attributable Annual Manufacturing Capacity (AAMC)

% MWh/yr

Fraction of production from project that will be allocated for clean energy generation. Total Attributable Annual Manufacturing Capacity

<!-- PageBreak -->

Electricity Efficiency

Annual Unit Production

#/yr

Projected (not peak or potential) number of units manufactured annually.

Unit Manufacturing Costs + Unit Sales Margin

$

Value added contribution to system resulting by factory production (excludes price paid for feedstock materials, upstream components, etc.).

Total price of the efficiency component including the

Total Price of Efficiency Component

$

manufactured sub-component.

Likely annual energy consumption of baseline system (WITHOUT

Annual Baseline System Consumption

MWh/yr

efficiency technology) under typical operation.

Likely annual energy consumption of improved system (WITH efficiency technology) under typical operation.

Annual Improved System Consumption

MWh/yr

Deployed Property Lifetime

-

yrs

Number of years the deployed property will operate. Fraction of production from project that will be allocated for

Percent Specified Advanced Energy Property

%

energy efficency as indicated in the "Improved System" calculation.

Attributable Annual Manufacturing Capacity (AAMC)

MWh/yr

Total Attributable Annual Manufacturing Capacity

Fuel Efficiency

Annual Unit Production

#/yr

Projected (not peak or potential) number of units manufactured annually.

Manufacturing Costs + Sales Margin

$

Value added contribution to system resulting by factory production (excludes price paid for feedstock materials, upstream components, etc.).

Total Price of Efficiency Component

$

Total price of the efficiency component including the manufactured sub-component.

Annual Baseline System Consumption

GGE/yr

Likely annual energy consumption of baseline system (WITHOUT efficiency technology) under typical operation.

Likely annual energy consumption of improved system (WITH efficiency technology) under typical operation.

Annual Improved System Consumption

GGE/yr

Deployed Property Lifetime

-

yrs

Number of years the deployed property will operate.

Percent Specified Advanced Energy Property

%

Fraction of production from project that will be allocated for fuel efficiency as indicated in the "Improved System" calculation.

Attributable Annual Manufacturing Capacity (AAMC)

GGE/yr

Total Attributable Annual Manufacturing Capacity

MWh consumed per GGE saved

0

MWh/GGE

For technologies such as electric vehicles or PHEVs, which require significant electricity consumption to enable fuel efficiency, state the calculated MWh consumed per GGE saved. This value will be used in the calculation of "AAMC CO2 Reduction" For other Fuel Efficiency technologies, this is not applicable and a value of "0" should be used.

<!-- PageBreak -->

GHG Reduction

Annual Unit Production

#/yr $

Projected (not peak or potential) number of units manufactured annually. In the case of liquids, "unit" may be a volume or mass.

Manufacturing Costs + Sales Margin

Value added contribution to system resulting by factory production (excludes price paid for feedstock materials, upstream components, etc.).

Total Price of GHG Component

$

Total price of the GHG component including the manufactured sub-component.

Annual Baseline System Performance

Mtons CO2eq/yr

Likely annual GHG emissions of baseline system under typical operation. For CCS technologies, this number can be zero.

Annual Improved System Performance Deployed Property Lifetime Percent Specified Advanced Energy Property

-

Mtons CO2eq/yr yrs %

Likely annual GHG emissions of improved system under typical operation. For CCS technologies, this number can be negative Number of years the deployed property will operate. Fraction of production which will allocated for GHG reduction purpose.

Attributable Annual Manufacturing

Mtons

Capacity (AAMC)

CO2eq/yr

Total Attributable Annual Manufacturing Capacity

Renewable Fuel Refining or Blending

Annual Unit Production

#/yr

Maximum annual refining or blending capacity of renewable fuels, in GGE terms, enabled by manufactured property.

Typical Annual Capacity per Unit Manufacturing Costs + Sales Margin

GGE/yr $

Estimated annual volume of fuel refined or blended annually, which is enabled by the pump under typical plant operations. Value added contribution to system resulting by factory production (excludes price paid for feedstock materials, upstream components, etc.).

Total Installed System Price

$

Price to owner of the entire refining or blending system including balance of system but excluding installation labor costs.

Deployed Property Lifetime

-

yrs

Number of years the deployed property will operate.

Percent Specified Advanced Energy Property

%

Fraction of production which will allocated for renewable fuel refinement of blending (NOTE must be 100% for eligible applications).

Attributable Annual Manufacturing Capacity (AAMC)

GGE/yr

Total Attributable Annual Manufacturing Capacity

Renewable Fuel and Process

Select Here

(Mtons CO2e / GGE consumed)

Select the most representative renewable fuel refining processes. This selection will reference the appropriate life cycle CO2 emissions value from the "LCA Fuel CO2 Assumptions" tab and be incorperated in the calculation of the "AAMC CO2 Reduction".

<!-- PageBreak -->

User Input
Calculated or from other tab

# Instructions

Note: This sheet is provided only to show assumptions, conversion factors, and their use in interim calculations. No user input is required and all significant calculated data

Assumptions and Conversion Factors

Metric

Sector

Value

Units

Assumptions

2008 Average U.S. Electric Rates

Residential - 11.36 ¢/kWh

11.36

Commercial - 10.28 ¢/kWh

10.28 ¢/kWh

Utility - 7.01 ¢/kWh

7.01

2008 Average Gasoline Price

3.26 $/Gallon

Conversion Factors

Average Utility Emission

0.606 Metric Tonnes per Megawatt Hour (Mtons/MWh)

Life Cycle kg CO2 per Gallon of Gasoline

Equivalent (GGE)

0.011 Mtons CO2/GGE ("well to wheels")

BTUs per GGE

114,000 BTU/GGE

User Cost Inputs

Data From Applicant

Data

Units

Notes from DOE

Factory Lifetime Cost Below Competitors

- -

Years

merit" unit here Provide "figure of

Demonstrated or verified competitiveness over comparable technology with respect to most relevant figure of merit (i.e. $/W, ¢/kWh etc.). Where possible, this should be a direct comparison to functionally equivalent technologies, NOT a comparison to a conventional energy technology.

Electricity Generation

AAMC per Tax Credit $

MWh/yr/$1M TC

AAMC divided by tax credit amount

Baseline LCOE

¢/kWh

LCOE of generation being replaced. (Residential, Commercial, or Utility from above).

Levelized Cost of Electricity

0.00

¢/kWh

Net present value assessment for the cost of electricity generation using the financial and resource assumptions (where available) provided in appendix B and including all life cycle costs.

Cost of Emission Reduction

$/Mton

Cost of CO2 emission based on LCOE and "Average Utility Emission".

<!-- PageBreak -->

Electricity Efficiency

AAMC per Tax Credit $

MWh/yr/$1M TC

AAMC divided by tax credit amount

Baseline LCOE

¢/kWh

LCOE of generation being replaced. (Residential, Commercial, or Utility from above).

0.00

Net present value assessment for the cost of electricity efficiency using baseline assumptions consistent with AMC calculations. NOTE: This may be a negative number for some efficiency technologies.

Levelized Cost of Energy Efficiency

¢/kWh

$/Mton

Cost of CO2 emission based on LCOE and "Average Utility Emission".

Cost of Emission Reduction

Fuel Efficiency

AAMC per Tax Credit $

0.00

$/GGE GGE/yr/$1M TC $/Mton

AAMC divided by tax credit amount This term represents the difference in LCOE ($/GGE) costs between the baseline system and the improved system. The specific calculation of this difference or increment will vary depending upon the fuel efficiency technology being considered. Efficiency and the 2008 average gasoline price.

Incremental Levelized Cost of Fuel Efficiency Cost of Emission Reduction

GHG Reduction

AAMC per Tax Credit $

Mtons CO2eq/yr/$1M TC

AAMC divided by tax credit amount

Levelized Cost of GHG Reduction

0.00

$/Mton CO2

Net present value assessment for the cost of GHG emission reduction including all life cycle costs.

Renewable Fuel Refining or Blending

AAMC per Tax Credit $

GGE/yr/$1M TC

AAMC divided by tax credit amount

Levelized Cost of Renewable Fuel Refinement or Blending

0.00

$/GGE

Net present value assessment for the cost of renewable fuel generation using the financial and resource assumptions (where available) provided in appendix B and including all life cycle costs.

Cost of Emission Reduction

$/Mton

Cost of CO2 emission based on the Levelized Cost of Fuel Efficiency and the 2008 average gasoline price.

<!-- PageBreak -->

# User Input

# Calculated or from other tab

Instructions

Note: This sheet is provided to show the life cycle emissions associated with various fuel production processes. No user input is required
and all significant calculated data are presented in "Applicant Data Sheet".

Fuel and process

Fuel/Vehicle Technology

(Mtons CO2e / GGE consumed) (GGE=Gallons of Gasoline Equivalent)

Biodiesel (Soy) CIDI ICE

0.00423

Butanol - Corn

0.00833

Cellulosic Ethanol - Corn Stover, Fermentation

0.00278

Cellulosic Ethanol - Farmed Trees, Fermentation

0.00053

Cellulosic Ethanol - Forest Residue, Gasification

0.00425

Cellulosic Ethanol - Herbaceous Biomass, Fermentation (ICE)

0.00325

Di-Methyl Ether

0.01286

Ethanol - Corn (ICE)

0.00945

Fischer Tropsch Diesel - CIDI ICE

0.01401

Gaseous Hydrogen - Central Power Plant Production

0.01644

Gaseous Hydrogen - Production from Natural Gas at Refueling Stations

0.01705

Reformulated Gasoline - Hybrid ICE/Electric

0.01287

Liquid Hydrogen - Central Production from Natural Gas

0.02121

Methanol

0.01303

Renewable Diesel - Soy - UOP-HDO

0.00438

Renewable Gasoline - Soy

0.00400

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.