Pennsylvania Act 1955-225 — GAS OPERATIONS WELL-DRILLING PETROLEUM AND COAL MINING ACT - REPEALED

act-1955-0-2251955 Pa. Act 225Law

Act text part 1
GAS OPERATIONS WELL-DRILLING PETROLEUM AND COAL MINING ACT - REPEALED
                 Act of Nov. 30, 1955, P.L. 756, No. 225              Cl. 52
                                  AN ACT

     Relating to coal mining, well operations and the underground
        storage of gas, except in storage reservoirs excavated in
        rock formations specifically for storage purposes, the safety
        of personnel and facilities employed therein, and the
        protection of the people residing in the area and their
        property rights; prescribing the rights and duties of well
        operators, before, during, and after the drilling of wells
        for the production, extraction or storage of any gas,
        petroleum or other liquid; regulating the underground storage
        of gas under workable coal seams; prescribing the rights and
        duties of owners and operators of coal mines in relation to
        wells and underground storage areas; granting certain
        corporations a limited right of eminent domain to appropriate
        interests in real property for surface and sub-surface
        operations in connection with the underground storage of gas;
        creating the Oil and Gas Division of the Department of Mines
        and defining its personnel, powers and duties; providing for
        hearings and the procedures to be followed therein and
        imposing duties upon the courts and providing methods for the
        enforcement of the provisions of this act and imposing
        penalties. (Title amended Mar. 3, 1970, P.L.81, No.38)

        Compiler's Note:  Section 6(a) of Act 48 of 1981, which
            provided for the fixing of fees charged by administrative
            agencies, provided that Act 225 is repealed insofar as it
            establishes a set fee for any activity inconsistent with
            the fees set forth in Act 48.

        The General Assembly of the Commonwealth of Pennsylvania
     hereby enacts as follows:

                                ARTICLE I
                          PRELIMINARY PROVISIONS

        Section 101.  Short Title.--This act shall be known as the
     "Gas Operations Well-Drilling Petroleum and Coal Mining Act."
        Section 102.  Definitions.--As used in this act:
        (1)  "Coal mine" means those operations in a coal seam which
     include the excavated and abandoned portions as well as the
     places actually being worked, also all underground workings and
     shafts, slopes, tunnels and other ways and openings and all such
     shafts, slopes, tunnels and other openings in the course of
     being sunk or driven, together with all roads and facilities
     connected with them below the surface.
        (2)  "Operating coal mine" means (i) a coal mine which is
     producing coal or has been in production of coal at any time
     during the twelve months immediately preceding the date its
     status is put in question under this act and any worked out or
     abandoned coal mine connected underground with or contiguous to
     such operating coal mine as herein defined and (ii) any coal
     mine to be established or reestablished as an operating coal
     mine in the future pursuant to subsection (c) of section 303 of
     this act.
        (3)  "Outside coal boundaries" when used in conjunction with
     the term "operating coal mine," means the boundaries of the coal
     acreage assigned to such coal mine and which can be practically
     and reasonably expected to be mined through such coal mine.
        (4)  "Workable coal seam" means (i) a coal seam in fact being
     mined in the area in question under this act by underground
     methods or (ii) one which in the judgment of the division can be
     and that it is reasonable to be expected will be mined by
     underground methods.
        (5)  "Coal operator" means any person as herein defined who
     proposes to or does operate a coal mine either as owner or
     lessee.
        (6)  "Well" when used in this act means a bore hole drilled
     or being drilled for the purpose of or to be used for producing,
     extracting or injecting any gas, petroleum or other liquid but
     excluding bore holes drilled to produce potable water to be used
     as such.
        (7)  "Division" means the Oil and Gas Division of the
     Department of Mines.
        (8)  "Owner" means any person as herein defined who owns,
     manages, operates, leases, controls or possesses any well or
     coal property.
        (9)  "Well operator" means any person as herein defined who
     proposes to or does locate, drill, operate, plug, recondition or
     abandon any well as herein defined; in cases where a well is
     used in connection with the underground storage of gas, the term
     "well operator" shall also mean a "storage operator" as
     hereinafter defined.
        (10)  "Gas" means any natural, manufactured or by-product gas
     or any mixture thereof.
        (11)  "Storage reservoir" means that portion of any
     subterranean sand or rock stratum or strata into which gas is or
     may be injected for the purpose of storage or for the purpose of
     testing whether said stratum is suitable for storage.
        (12)  "Plat" means a map, drawing or print accurately drawn
     to scale showing the proposed or existing location of a well or
     wells as herein defined.
        (13)  "Casing" means a string or strings of pipe commonly
     placed in wells drilled for natural gas or petroleum.
        (14)  "Bridge" means an obstruction placed in a well at any
     specified depth.
        (15)  "Cement" or "cement grout" means hydraulic cement
     properly mixed with water only.
        (16)  "Linear foot" means a unit of measurement in a straight
     line on a horizontal plane.
        (17)  "Oil" means the same as the word "petroleum."
        (18)  "Person" means any individual, association, partnership
     or corporation.
        (19)  "Reservoir protective area" means all of that area
     outside of and surrounding the storage reservoir boundary but
     within two thousand linear feet thereof.
        (20)  "Retreat mining" means the removal of such coal
     pillars, ribs and stumps as remain after the development mining
     has been completed in that section of a coal mine.
        (21)  "Pillar" means a solid block of coal surrounded by
     either active mine workings or a mined out area.
        (22)  "Inactivate" means to shut off all flow of gas from a
     well by means of a temporary plug or other suitable device or by
     injecting aquagel or other such equally non-porous material into
     the well.
        (23)  "Storage operator" means any person, as herein defined,
     who proposes to or does operate a storage reservoir either as
     owner or lessee.
        (24)  "Completion of a well" shall mean the date after
     treatment, if any, that the well is properly equipped for
     production of oil or gas; or if the well is dry, the date the
     well is abandoned. ((24) added July 31, 1968, P.L.881, No.265)
        Section 103.  Exclusions From Effect of Act.--Nothing
     contained in this act shall apply to storage of gas or liquids
     in storage reservoirs excavated in rock formations specifically
     for storage purposes.
        Section 104.  Declaration of Public Policy.--The provisions
     of this act shall be liberally construed to effect the safety of
     personnel and facilities employed in the underground storage of
     gas and the protection of the people residing in the area where
     such gas is stored and their property rights.
        (104 added Mar. 3, 1970, P.L.81, No.38)

                                ARTICLE II
                          DRILLING AND PLUGGING

        Section 201.  Well Operator's Responsibility Before and
     During Drilling.--(a)  Before drilling any well, the well
     operator shall have a plat prepared by a competent engineer or
     surveyor (on a form to be furnished by the division) showing the
     political subdivision and county in which the tract of land upon
     which the well to be drilled is located, the name of the lessor
     or landowner, the name of the owner or operator of all known
     underlying workable coal seams, if any, the acreage in the tract
     to be drilled, the proposed location of the well determined by
     survey, the courses and distances of such location from two or
     more permanent points or landmarks on said tract, the proposed
     angle and direction of such well, if the well is to be deviated
     substantially from a vertical course and the number or other
     identification to be given the well, indicating the workable
     coal seams, if any, underlying said tract which are to be cased
     off in accordance with section 204 of this act and shall
     forward, by registered mail, copies of the plat to the division
     and the division shall in turn forward, by registered mail, a
     copy of said plat to the owner and lessee, if any, of such coal
     and every coal operator, operating in any of said seams of coal,
     who has the right to file objections under section 202 and who
     has mapped the same and filed his maps with the Department of
     Mines as required by law. If the well operator submits to the
     division written approval of the proposed well location by the
     coal operator or owner, if any, of the coal underlying the
     proposed well location and no objections are raised by the
     division within ten days or if no such approval has been
     submitted and no objections are made to such proposed well
     location within ten days from receipt of such notice by the coal
     operator or owner, if any, or by the division, the same shall be
     filed and become a permanent record of such location, subject to
     inspection at any time by any interested person, and the
     division shall forthwith issue a drilling permit to the well
     operator and the well operator may proceed with the drilling of
     the well at the exact location shown on the plat: Provided,
     however, That in non-coal areas where more than one well is to
     be drilled as part of the same development project, only the
     first well of the project need be located by survey. The
     remaining wells of the project shall be shown on the plat with
     courses and distances from the first well plainly marked. Prior
     to drilling each of the additional project wells, the well
     operator shall notify the division of his intention, and a
     permit will be issued forthwith.
        (b)  It shall be the duty of the well operator to keep a
     driller's log of such well. Such log shall show the character,
     thickness and depth of the formations passed through or
     encountered in the drilling of such well and show the depth at
     which all gas, oil and water were encountered. The log shall
     show whether the well is productive of gas, oil or water, the
     volume or quantity thereof and the initial rock pressure of such
     well which has been taken for a period of not less than forty-
     eight hours. A copy of this log shall be furnished to the
     division within thirty days after the completion of the well and
     it shall be kept on file by the division.
        (c)  Drilling permits issued for wells covered by this act
     shall expire one year after issuance unless operations for
     drilling the well are commenced within such period and
     prosecuted with due diligence. Nothing in this subsection shall
     be construed to rescind the provisions pertaining to drilling
     permits contained in the act of July 25, 1961 (P.L.825), known
     as the "Oil and Gas Conservation Law."
        (201 amended July 31, 1968, P.L.881, No.265)
        Section 202.  Drilling Permit, Agreed Location of Wells,
     Docket of Proceedings.--(a)  In case any well location referred
     to in subsection (a) of section 201 is made so that the well
     when drilled will penetrate anywhere within the outside coal
     boundaries of any operating coal mine or coal mine already
     projected and platted but not yet being operated or within one
     thousand linear feet beyond such boundaries and the well when
     drilled or the pillar of coal about the well will, in the
     opinion of the coal owner or operator, unduly interfere with or
     endanger such mine, then the coal owner or operator affected
     shall have the right to file objections in accordance with
     subsection (h) of section 501 to such proposed location within
     ten days of the receipt by the coal operator of the plat
     provided for in subsection (a) of section 201. An alternative
     location at which the proposed well could be drilled to overcome
     such objections shall, if possible, be indicated. If no such
     objections to the proposed location are filed or if none are
     raised by the division within ten days after receipt of the plat
     by the coal operator or owner, or if written approval by the
     coal operator or owner of the location is filed with the
     division and no objections are raised by the division within ten
     days, the division shall forthwith issue to the well operator a
     drilling permit authorizing the well operator to drill at such
     location.
        (b)  If any objections are filed by any coal operator or
     owner or are made by the division, the division shall fix a time
     and place for a conference in accordance with section 502 not
     more than ten days from the date of the service of such
     objections on the well operator at which conference the well
     operator and such coal operators or owners as are present or
     represented shall consider the objections and attempt to agree
     upon a location. If they fail to agree upon a location, the
     division shall direct that a hearing be held within five days of
     such conference in accordance with section 502 and, after such
     hearing, shall, by an appropriate order, determine a location on
     such tract of land as near to the original location as possible
     where, in the judgment of the division, the well can be safely
     drilled without unduly interfering with or endangering such
     mine. Such new location as agreed upon by said parties or as
     determined by the division shall be indicated on the plat on
     file with the division and shall become a permanent record,
     whereupon the division shall promptly issue a drilling permit
     authorizing the well operator to drill at the location agreed
     upon by the parties or as determined by the division.
        (c)  Within one hundred and twenty days after the
     commencement of drilling operations, the coal operator shall
     accurately locate the well by a closed survey on the same datum
     as the mine workings or coal boundaries are mapped and file the
     results of the survey with the division and forward, by
     registered mail, a copy to the well operator.
        (d)  No well shall be drilled except in accordance with a
     permit issued under this section. ((d) amended July 31, 1968,
     P.L.881, No.265)
        (e)  ((e) repealed July 31, 1968, P.L.881, No.265)
        Section 203.  Coal Operator's Responsibility Upon Approaching
     Wells Already Drilled or Located.--(a)  Hereafter, at any time
     prior to removing any coal or other underground material or
     extending the workings in any coal mine within five hundred feet
     of any oil or gas well of which the coal operator has knowledge,
     or any approved well location of which the coal operator has
     knowledge, the coal operator shall forward, by registered mail,
     to or file with the well operator and the division a copy of
     such relevant part of its maps and plans which it is presently
     required by law to prepare and file with the Department of
     Mines, showing the pillar which the coal operator proposes to
     leave in place around each oil or gas well in the projected
     workings. Following the filing of said maps and plans, the coal
     operator may proceed with his mining operations in the manner
     projected on said maps and plans but he shall not remove any
     coal or cut any passageway within one hundred fifty feet of any
     such well or approved well location until a permit has been
     issued as hereinafter provided. If, in the opinion of the well
     operator or the division, such plan indicates that the pillar
     proposed to be left around any such well or approved well
     location is insufficient in size, then the well operator
     affected shall attempt to agree with the coal operator upon a
     suitable pillar, subject to the approval of the division but,
     failing to agree, such well operator may, within ten days from
     receipt by them of such plan, file objections in accordance with
     subsection (h) of section 501 to such proposed plan, indicating
     the size of the pillar to be left with respect to each such
     well. If no objections are filed within said ten day period or
     if none are raised by the division, the division shall forthwith
     issue a permit to the coal operator reciting the filing of said
     maps or plans, that no objections have been made thereto and
     that the pillar proposed to be left for each such well is
     approved in the manner as projected.
        (b)  If any objections are filed by such well operator or are
     raised by the division, the division shall direct that a
     conference be held in accordance with section 502 within ten
     days of the filing of such objections. At such conference the
     coal operator and the person who has filed such objections shall
     attempt to agree upon a proposed plan, showing the pillar to be
     left around each well, which will satisfy such objections and be
     approved by the division and, if such plan is agreed upon, the
     division shall forthwith issue to the coal operator a permit
     reciting the filing of said plan and that the pillar to be left
     for each such well is approved as agreed upon. If no such plan
     showing the pillar to be left with respect to each well can be
     agreed upon at such conference, the division shall direct that a
     hearing be held within five days after such conference in
     accordance with section 502 and, after such hearing, shall, in
     accordance with the standards set forth in this section and by
     an appropriate order, determine the pillar to be left with
     respect to each such well. In any proceeding under this section,
     the division shall follow as nearly as is possible the original
     plan filed by the coal operator. The division shall not require
     the coal operator to leave a pillar in excess of one hundred
     feet in radius, except that, if it is established that unusual
     conditions exist requiring the leaving of a larger pillar, the
     division may require a pillar up to but not exceeding one
     hundred fifty feet in radius. The pillar to be left with respect
     to each well as determined by the division shall be shown on the
     maps or plans on file with the division as provided in
     subsection (a) of this section and the division shall thereupon
     issue to the coal operator a permit approving the pillar to be
     left for each such well.
        (c)  Whenever a permit shall have been issued by the division
     under this section approving or requiring a certain plan for the
     leaving of a pillar of a specified size in the projected
     workings and it shall thereafter be demonstrated by further
     mining operations in the area that such a pillar is insufficient
     in size, the well operator shall, subject to the approval of the
     division, attempt to agree with the coal operator upon a
     suitable pillar but, failing to agree, such well operator or
     operators may file a petition with the division to review such
     plan and, following the procedure hereinabove in this section
     prescribed, the division may, by an appropriate order,
     determine, subject to the limitations set forth in this section,
     a different plan showing the pillar to be left thereafter with
     respect to each such well and an amended permit shall thereupon
     be issued approving the pillar to be left for each such well.
        (d)  Application may be made at any time to the division by
     the coal operator to leave a pillar of less size than that shown
     on the plan filed by him or approved or determined by the
     division pursuant to the provisions of this section. If any such
     application is filed, the division may, following the procedure
     hereinbefore in this section prescribed, by an appropriate
     order, determine a different plan showing a pillar of less size
     with respect to any or all wells covered by such application and
     an amended permit shall thereupon be issued approving the pillar
     to be left with respect to each such well.
        (e)  No coal operator shall, without the written approval of
     the division after notice and opportunity for hearing as
     prescribed in this section, remove any coal or cut any
     passageway so as to leave a pillar of less size with respect to
     any oil or gas well than shown on a permit or amended permit
     issued under this section.
        (f)  Nothing in this act shall be construed to require a well
     operator to pay for any coal pillar required by the act to be
     left around any well drilled prior to the effective date of this
     act. Nothing contained in this act, which may require a coal
     operator to leave a pillar of coal of a certain size around a
     well drilled after the effective date of this act, shall in any
     way affect (1) any right which the coal operator would have had
     prior to the effective date of this act to obtain payment for
     such coal nor (2) any duty or right which the well operator,
     storage operator or land owner may have had prior to the
     effective date of this act to pay for or not to pay for such
     coal.
        Section 204.  Method of Casing Through Coal Seams.--(a)  When
     a well is drilled at a location where the coal has been removed
     from only one seam, the hole shall be drilled at least thirty
     feet below the coal seam and of a sufficient size to permit the
     placing of a steel pipe liner not less than ten inches in
     diameter and of at least one-quarter inch wall thickness. The
     liner shall extend from a point not less than twenty-five feet
     below the coal seam to a point not less than twenty-five feet
     above it. The bottom end of the liner shall be fastened and
     sealed to the casing and the casing shall be centrally located
     within the liner, the casing and liner to be run and cemented
     when the well is drilled at least thirty feet but not more than
     fifty feet below the coal seam. The annular space between said
     casing and liner shall be filled with bentonitic mud, cement or
     such nonporous material as the division may approve pursuant to
     an application filed under section 207. The casing shall be
     raised at least ten feet off the bottom of the hole and cement
     shall be placed in the well through the casing to a depth of at
     least twenty feet. After the cement has been placed, the casing
     shall be lowered to the bottom of the hole. In each case, where
     cement is used to set such liners or casing strings, sufficient
     time shall be allowed for the proper setting of the cement
     before drilling is resumed. The casing string shall be equipped
     with either an approved packer or casing shoe. A liner may be
     run and cemented as a separate string of pipe: Provided,
     however, That the liner is run and cemented when the well is
     drilled at least thirty feet but not more than fifty feet below
     the coal seam; or such alternate method of protecting the coal
     seam may be employed as the division may approve pursuant to an
     application filed under section 207. Such representative of the
     division as the deputy secretary shall have designated and the
     coal operator shall be given at least seventy-two hours notice
     by the well operator when the work described above is to be
     done. ((a) amended July 31, 1968, P.L.881, No.265)
        (b)  When a well is drilled at a location where the coal has
     been removed from two or more seams, such liner shall extend not
     less than twenty-five feet below the lowest seam penetrated and
     shall extend to a point not less than twenty-five feet above the
     highest such seam. In such multiple coal seams in a location
     from which the coal has been removed, the liner may be run and
     cemented as a separate string of pipe: Provided, however, That
     the liner shall be run and cemented when the well is drilled at
     least thirty feet and not more than fifty feet below the lowest
     coal seam; or such alternate method of protecting the coal seams
     may be employed as the division may approve pursuant to an
     application filed under section 207. Such representative of the
     division as the deputy secretary shall have designated and the
     coal operator shall be given at least seventy-two hours notice
     by the well operator when the casing is to be cemented through
     the coal seam. ((b) amended July 31, 1968, P.L.881, No.265)
        (c)  A well penetrating one or more workable coal seams in a
     location from which the coal has not been removed shall be
     drilled to such depth and of such size as will permit the
     placing of casing and packers in the hole at such points and in
     such manner as will exclude all oil or gas from the coal seam,
     except such as may be found naturally in the coal seam itself.
     Each string of casing run in the hole shall be provided with a
     steel casing, shoe collar, packer or other suitable device
     firmly fixed on the bottom of such string of casing. The outer
     string of casing run through any workable coal seam shall be of
     at least one-quarter inch wall thickness and shall be seated at
     least thirty feet below such coal seam or, if run through more
     than one workable coal seam, then at least thirty feet below the
     lowest of such coal seams, in at least twenty feet of cement,
     bentonitic mud or nonporous material or by such alternate method
     as the division may approve pursuant to an application filed
     under section 207 and such casing string shall extend to the
     surface. The space behind the largest diameter casing extending
     through a workable coal seam or seams shall be filled to the
     extent possible to the surface with cement, bentonitic mud or
     such nonporous material or by such alternate method as the
     division may approve pursuant to an application filed under
     section 207. Such representative of the division as the deputy
     secretary shall have designated and the coal operator or owner
     shall be given at least seventy-two hours notice by the well
     operator when the well is to be cased through such coal seam.
     ((c) amended July 31, 1968, P.L.881, No.265)
        (d)  In the event that gas is found beneath a workable coal
     seam before the size of the hole has been reduced, a packer
     shall be placed below such coal seam and above the gas horizon
     and the gas by this means shall be diverted to the inside of the
     adjacent string of casing through perforations made in such
     casing and through it shall be passed to the surface without
     contact with the coal seam. Should oil or gas be formed between
     two workable seams of coal in a hole of the same diameter, from
     seam to seam, two packers shall be placed with perforations in
     the casing between them permitting the gas to pass to the
     surface inside the adjacent casing or the gas may be sealed off
     by cement or by some other method approved by the division
     pursuant to an application filed under section 207. In either of
     the cases here specified, the strings of casing shall extend
     from their seats to the top of the well.
        (e)  In the event that a well becomes commercially productive
     of natural gas or petroleum, all coal-protecting strings of
     casing shall remain in place during the life of the well and
     until such well is properly plugged. The annular space between
     the various strings of casing adjacent to workable seams of coal
     shall be kept open, except as provided in subsection (d) of this
     section, and the top ends of all such strings shall be provided
     with casing heads or such other suitable devices as will permit
     the passage of gas into the air or into a pipeline and prevent
     the obstructing or filling of such annular spaces with dirt or
     debris.
        Section 205.  Notice of Intention to Plug a Well and Filing
     of Plugging Certificate.--(a)  Prior to the abandonment of any
     well in an area underlain by a workable coal seam, the well
     operator shall notify the coal operator and the owner of all
     known workable coal seams to whom notices are required to be
     given under section 201 and such representative of the division
     as the deputy secretary shall have designated, of his intention
     to plug and abandon any such well and submit a plat (on a form
     to be furnished by the division) showing the location of the
     well and fixing the time at which the work of plugging will be
     commenced, which time shall be not less than seventy-two hours
     after the time when such notice is received, in order that their
     representatives may be present at the plugging of the well. Such
     notice may be waived by the division and said coal operator or
     owner and either of them may likewise waive his right to be
     present but such waiver shall be in writing and a copy thereof
     attached to notice of abandonment, filed with the division under
     this section. Whether or not such representatives appear, the
     well operator may, if he has fully complied with the
     requirements of this section, proceed, at the time fixed, to
     plug the well in the manner hereinafter described. When such
     plugging has been completed, a certificate shall be prepared (on
     a form to be furnished by the division) by two experienced and
     qualified men who participated in the work setting forth the
     time and manner in which the well was plugged. One copy of this
     certificate shall be mailed to each coal operator or owner to
     whom notice was given by registered mail and another copy shall
     be mailed to the division.
        (b)  Prior to the abandonment of any well in an area not
     underlain by a workable coal seam, the well operator shall
     notify the division or such representative of the division as
     the deputy secretary shall have designated of his intention to
     plug and abandon any such well and submit a plat (on a form to
     be furnished by the division) showing the location of the well
     and fixing the time at which the work of plugging will be
     commenced, which time shall not be less than seventy-two hours
     nor more than thirty days after the time of mailing such notice,
     in order that the division representative may be present at the
     plugging of the well. Such notice or waiting period may be
     verbally waived by the division or its representative: Provided,
     however, That in non-coal areas where more than one well has
     been drilled as part of the same development project, and these
     wells are now to be plugged, it is required that the district
     oil and gas representative be given seventy-two hours notice
     prior to plugging the first well of such project subject to
     waiver of notice described herein. In the plugging of subsequent
     wells on this project it shall be the responsibility of the
     division representative to learn when this work is to be
     continued. Whether or not such division representative appears,
     the well operator may, if he has fully complied with the
     requirements of this section, proceed at the time fixed to plug
     the well in the manner hereinafter described. When such plugging
     has been completed a certificate shall be prepared, (on a form
     to be furnished by the division) by two experienced and
     qualified men who participated in the work, setting forth the
     time and manner in which the well was plugged. A copy of this
     certificate shall be mailed to the division.
        (205 amended July 31, 1968, P.L.881, No.265)

        Compiler's Note:  Section 9(b) of Act 173 of 1978 provided
            that section 205 is repealed insofar as it is
            inconsistent with 1 Pa.C.S. § 2301(d) (relating to
            equality of rights based on sex)..
        Section 206.  Plugging and Pulling Casing.--(a)  Upon
     abandoning or ceasing to operate any well in an area not
     underlain by a workable coal seam, the owner or operator thereof
     shall plug the same in the following manner.
        The well shall be filled with sand pumpings, mud or other
     equally nonporous material as the division may approve pursuant
     to an application filed under section 207, from the bottom of
     the well to a point twenty feet above the top of the lowest
     stratum bearing or having borne oil, gas or water or a permanent
     bridge shall be anchored thirty feet below the lowest stratum
     bearing or having borne oil, gas or water and from such bridge
     the well shall be filled with sand pumpings, mud or other
     equally nonporous material as the division may approve pursuant
     to an application filed under section 207, to a point twenty
     feet above such stratum. At this point there shall be placed a
     plug of cement or other equally nonporous material to a depth of
     at least twenty feet which will completely seal the hole. A
     sufficient lapse of time shall be allowed after the introduction
     of the cement or other material for it to set properly before
     proceeding. Between this sealing plug and a point twenty feet
     above the next higher stratum bearing or having borne oil, gas
     or water, the hole shall be either filled or bridged and filled
     in the manner just described and at such point there shall be
     placed another similar plug of cement or other equally nonporous
     material to a depth of at least twenty feet which will
     completely seal the hole. In like manner the hole shall be
     filled and plugged or bridged, filled and plugged with reference
     to each of the strata bearing or having borne oil, gas or water.
     Whenever such strata are not widely separated and are free from
     water, they may be grouped and treated as a single horizon and
     the aforesaid filling and plugging may be performed as though
     there were but one horizon. After plugging all strata bearing or
     having borne oil, gas or water, as aforesaid, a bridge shall be
     anchored approximately thirty feet below the water string of
     casing and there shall be placed another similar plug of cement
     or other equally nonporous material to a depth of at least ten
     feet, which will completely seal the hole, after which said
     casing may be drawn. A final plug shall be anchored
     approximately ten feet below the bottom of the largest casing in
     the well and, from this point to the surface, the well shall be
     filled with sand pumpings, mud or other equally nonporous
     material.
        (b)  In an area not underlain by a workable coal seam when it
     is desired to pull the casing in any well, the well may be
     produced through tubing placed on a packer and, after cement has
     been poured on the packer to a depth of not less than twenty
     feet and the annular space outside of the tubing and above the
     cement plug is filled with cement, aquagel or other equally
     nonporous material or such alternate method as the division may
     approve pursuant to an application filed under section 207, up
     to the bottom of the smallest water string of casing, then the
     casing or casings may be pulled.
        Upon the abandonment of such well, a plug or bridge shall be
     placed in the tubing at a point near the depth at which the
     packer was set and cement placed on top of said plug or bridge
     to a depth of not less than thirty feet. After the tubing has
     been parted above the plug and pulled, a bridge shall then be
     set at a depth of not less than thirty feet from the surface and
     the hole completely filled from that point to the surface with
     sand pumpings, mud or other suitable material. With the approval
     of the division pursuant to an application filed under section
     207, some other equally effective method of pulling casing or
     plugging may be used.
        (c)  Upon abandoning or ceasing to operate any well which
     passes through a workable coal seam, the owner or operator of
     said well shall plug the same in the following manner.
        The well shall be filled with sand pumpings or such nonporous
     material as the division may approve pursuant to an application
     filed under section 207, to the top of the lowest stratum
     bearing or having borne oil, gas or water and, at such point, a
     suitable type of plug approved by the division shall be placed.
     The space above the plug shall be filled for at least twenty
     feet with cement or such nonporous material as the division may
     approve, pursuant to an application filed under section 207. A
     sufficient lapse of time shall be allowed after the introduction
     of the cement or other material for it to set properly before
     proceeding. All other formations encountered in the well which
     bear or have borne oil, gas or water shall be plugged and filled
     in the same manner. A final plug shall be anchored approximately
     ten feet below the bottom of the smallest coal protecting string
     of casing but not less than forty feet below the lowest workable
     coal seam and the hole above filled with approximately twenty
     feet of rock or gravel. After the inside casing has been drawn,
     there shall be placed on top of the rock or gravel above the
     final plug a vent pipe at least two inches in diameter with a
     bell fitting or other suitable device to carry any free gas into
     the vent pipe. The vent pipe shall extend above the surface at
     least six feet and shall be fitted at the top with a tee and two
     street ells, or similar devices, to prevent debris from entering
     the vent pipe. The space surrounding the vent pipe and
     immediately above the bell fitting or other device shall be
     filled with a maximum of five feet of sand pumpings or fine
     gravel and, then, the space from this point shall be filled with
     cement to a point not less than twenty-five feet above the
     highest workable coal seam. From this point to the surface, the
     space around the vent pipe shall be filled with sand pumpings or
     other equally nonporous material. In a storage reservoir subject
     to section 304, the vent pipe shall be maintained in good repair
     by the storage operator. If approved by the division pursuant to
     an application filed under section 207, an alternative method of
     plugging and venting may be employed.
        ((c) amended July 31, 1968, P.L.881, No.265)
        (d)  Upon abandoning or ceasing to operate any well pursuant
     to this section where any of the strata bearing or having borne
     oil, gas or water in a well has been shot, thereby creating
     cavities which cannot be readily filled in the manner above
     described, the well operator shall use either of the following
     methods unless he has approval of the division pursuant to an
     application filed under section 207 to use an alternative
     method:
        (1)  Should the stratum which has been shot be the lowest one
     in the well, there shall be placed at the nearest suitable point
     but not less than twenty feet above the stratum, a plug of
     cement or other equally nonporous material, to a depth of at
     least twenty feet, which will completely seal the hole. A
     sufficient lapse of time shall be allowed after the introduction
     of the cement or other material for it to set properly before
     proceeding. In the event, however, that the shooting has been
     done above one or more strata bearing or having borne oil, gas
     or water in the well, plugging in the manner specified shall be
     done at the nearest suitable points to not less than twenty feet
     below and not less than twenty feet above the stratum shot. From
     a point immediately above the above mentioned plug, the well
     shall be plugged in accordance with subsection (a), (b) or (c)
     of this section, whichever is applicable.
        (2)  When such cavity shall be in the lowest stratum bearing
     or having borne oil, gas or water in the well, a liner shall be
     placed which shall extend from not less than twenty feet above
     to a solid bottom in the stratum in which the shooting has been
     done. In the event, however, that the shooting has been done
     above one or more strata bearing or having borne oil, gas or
     water in the well, the liner shall be so placed that it will
     extend not less than twenty feet above nor less than twenty feet
     below the stratum in which shooting has been done. Following the
     placing of the liner in the manner here specified, it shall be
     completely filled with sand pumpings, mud or other equally
     nonporous material as the division may approve pursuant to an
     application filed under section 207. From a point immediately
     above the top of said liner, the well shall be plugged in
     accordance with subsection (a), (b) or (c) of the section,
     whichever is applicable.
        Section 207.  Alternative Method.--(a)  Whenever provision is
     made in this act by reference to this section for using an
     alternative method or material in carrying out any obligation
     imposed by the act, the person seeking the authority to use such
     alternative method or material shall file an application with
     the division, describing such proposed alternative method or
     material in reasonable detail. Notice of filing of any such
     application shall be given by registered mail to any coal
     operator or operators affected. Any such coal operator may,
     within ten days following such notice, file objections to such
     proposed alternative method or material. If no objections are
     filed within said ten day period or if none is raised by the
     division, the division shall forthwith issue a permit approving
     such proposed alternative method or material.
        (b)  If any such objections are filed by any coal operator or
     are raised by the division, the division shall direct that a
     conference be held in accordance with section 502 within ten
     days following the filing of such objections. At such conference
     the person seeking approval of the alternative method or
     material and the person who has filed such objections shall
     attempt to agree on such alternative method or material or any
     modifications thereof and, if such agreement is reached and
     approved by the division, the division shall forthwith issue a
     permit approving the alternative method or material. If no such
     agreement is reached and approved, the division shall direct
     that a hearing be held in accordance with section 502 hereof:
     Provided, however, That if the alternative method or material
     involves a new development in technology or technique, the
     division may before such a hearing is held, grant such affected
     parties a period not to exceed ninety days to study and evaluate
     said proposed alternative method or material. Following such
     hearing, if the division shall find that such proposed
     alternative method or material will furnish adequate protection
     to the workable coal seams, the division shall by order approve
     such alternative method or material, otherwise the division
     shall deny the said application.
        Section 208.  Oil and Gas Division Cooperation with Sanitary
     Water Board.--Upon request of the Sanitary Water Board the Oil
     and Gas Division shall, and upon its own initiative it may,
     submit to said board recommended regulations for the control and
     prevention of pollution of surface and underground waters
     resulting from drilling, operation, abandonment or plugging of
     oil or gas wells. The Oil and Gas Division shall report to the
     Sanitary Water Board any violation of The Clean Streams Law, or
     of any regulation or order of said board issued pursuant
     thereto, which the division shall find in its inspections and
     investigations made under the authority conferred by section 501
     (g) of this act.
        (208 added July 31, 1968, P.L.881, No.265)

                               ARTICLE III
              REGULATION OF UNDERGROUND GAS STORAGE POOLS IN
                              CERTAIN AREAS

        Section 301.  Filing of Maps and Data by Persons Operating or
     Proposing to Operate Gas Storage Reservoirs.--(a)  Any person
     who, on the effective date of this act, is injecting gas into or
     storing gas in a storage reservoir which underlies or is within
     three thousand linear feet of an operating coal mine which is
     operating in a coal seam that extends over the storage reservoir
     or the reservoir protective area, shall, within sixty days
     thereafter, file with the division a copy of a map and certain
     data in the form and manner provided in this subsection.
        Any person who, on the effective date of this act, is
     injecting gas into or storing gas in a storage reservoir which
     is not at such date under or within three thousand linear feet
     but is less than ten thousand linear feet from an operating coal
     mine which is operating in a coal seam that extends over the
     storage reservoir or the reservoir protective area, shall file
     such map and data within such time in excess of sixty days as
     the division may fix.
        Any person who, after the effective date of this act,
     proposes to inject or store gas in a storage reservoir located
     as above, shall file the required map and data with the division
     not less than six months prior to the starting of actual
     injection or storage.
        The map provided for herein shall be prepared by a competent
     engineer or geologist. It shall show the stratum or strata in
     which the existing or proposed storage reservoir is or is to be
     located, the geographic location of the outside boundaries of
     the said storage reservoir and the reservoir protective area,
     the location of all known oil or gas wells which have been
     drilled into or through the storage stratum within the reservoir
     or within three thousand linear feet thereof, indicating which
     of these wells have been or are to be cleaned out and plugged or
     reconditioned for storage and also indicating the proposed
     location of all additional wells which are to be drilled within
     the storage reservoir or within three thousand linear feet
     thereof.
        The following information, if available, shall be furnished
     for all known oil or gas wells which have been drilled into or
     through the storage stratum within the storage reservoir or
     within three thousand linear feet thereof, name of the operator,
     date drilled, total depth, depth of production if the well was
     productive of oil or gas, the initial rock pressure and volume,
     the depths at which all coal seams were encountered and a copy
     of the driller's log or other similar information. At the time
     of the filing of the aforesaid maps and data, such person shall
     file a detailed statement of what efforts he has made to
     determine (1) that the wells shown on said map are accurately
     located thereon and (2) that, to the best of his knowledge, they
     are all the oil or gas wells which have ever been drilled into
     or below the storage stratum within the proposed storage
     reservoir or within the reservoir protective area. This
     statement shall also include information as to whether or not
     the initial injection is for testing purposes, the maximum
     pressure at which injection and storage of gas is contemplated
     and a detailed explanation of the methods to be used or which,
     theretofore, have been used in drilling, cleaning out,
     reconditioning and plugging wells in the storage reservoir or
     within the reservoir protective area. The map and data required
     to be filed hereunder shall be amended or supplemented semi-
     annually in case any material changes have occurred: Provided,
     however, That the division may require a storage operator to
     amend or supplement such map or data at more frequent intervals
     if material changes have occurred justifying such earlier
     filing.
        (b)  The requirements of this section shall not apply to the
     operator of an underground gas storage reservoir so long as said
     reservoir is located more than ten thousand linear feet from an
     operating coal mine: Provided, however, That such storage
     operator shall give notice to the division of the name of each
     political subdivision and county in which said operator
     maintains and operates a gas storage reservoir. In those
     political subdivisions and counties where both gas storage
     reservoirs and coal mines are being operated, the division may
     request the storage operator to furnish maps showing the
     geographical location and outside boundaries of such storage
     reservoirs. The division shall keep a record of such information
     and shall promptly notify both the coal operator and the storage
     operator if it is found that the coal mine and storage reservoir
     are within ten thousand linear feet of each other.
        (c)  At the time of the filing of the above maps and data and
     the filing of amended or supplemented maps or data, the division
     shall give written notice of said filing to all persons who may
     be affected under the provisions of this act by the storage
     reservoir described in such maps or data. Such notices shall
     contain a description of the boundaries of such storage
     reservoir. When a person operating a coal mine or owning an
     interest in coal properties which are or may be affected by the
     storage reservoir requests, in writing, a copy of any map or
     data filed with the division, such copy shall be furnished by
     the storage operator.
        (d)  For all purposes of this act, the outside boundaries of
     a storage reservoir shall be defined by the location of those
     wells around the periphery of the storage reservoir which had no
     gas production when drilled in said storage stratum: Provided,
     however, That the boundaries as thus defined shall be originally
     fixed or subsequently changed where based upon the number and
     nature of such wells, upon the geological and production
     knowledge of the storage stratum, its character, permeability
     and distribution and operating experience, it is determined in a
     conference or hearing under section 502 that modification should
     be made.
        Section 302.  Filing of Maps and Data by Persons Operating
     Coal Mines.--(a)  Any person owning or operating a coal mine
     shall, within thirty days from the effective date of this act,
     file with the division a map prepared by a competent engineer,
     showing the outside coal boundaries of the said operating coal
     mine, the existing workings and exhausted areas and the
     relationship of said boundaries to identifiable surface
     properties and landmarks: Provided, however, That any operating
     coal mine, which has been penetrated by a well since the
     effective date of this act, shall furnish a mine map to the
     division each year indicating the excavations for the preceding
     year and the projections for the ensuing year. Any person who is
     storing or contemplating the storage of gas in the vicinity of
     such operating coal mines shall, upon written request, be
     furnished a copy of the aforesaid map by the coal operator and
     such person and the division shall, thereafter, be informed of
     any boundary changes at the time such changes occur. The
     division shall keep a record of such information and shall
     promptly notify both the coal operator and the storage operator
     if it is found that the coal mine and the storage reservoir are
     within ten thousand linear feet of each other. ((a) amended July
     31, 1968, P.L.881, No.265)
        (b)  Any person owning or operating any coal mine which, on
     the date of the enactment of this act, is or which thereafter
     comes within ten thousand linear feet of a storage reservoir,
     and where the coal seam being operated extends over the storage
     reservoir or the reservoir protective area, shall, within forty-
     five days after he has notice from the division of such fact,
     file with the division and furnish to the person operating such
     storage reservoir a map in the form hereinabove provided and
     showing, in addition, the existing and projected excavations and
     workings of such operating coal mine for the ensuing eighteen
     month period and, also, the location of any oil or gas wells of
     which said coal operator has knowledge. Such person owning or
     operating said coal mine shall, each six months thereafter, file
     with the division and furnish to the person operating such
     storage reservoir a revised map showing any additional
     excavations and workings, together with the projected
     excavations and workings for the then ensuing eighteen month
     period, which may be within ten thousand linear feet of said
     storage reservoir: Provided, however, That the division may
     require a coal operator to file such revised map at more
     frequent intervals if material changes have occurred justifying
     such earlier filing. Such person owning or operating said coal
     mine shall also file with the division and furnish the person
     operating said reservoir prompt notice of any wells which have
     been cut into, together with all available pertinent
     information.
        Section 303.  Notice by Persons Operating Coal Mines.--(a)
     Any person owning or operating a coal mine on the effective date
     of this act and having knowledge that it overlies or is within
     two thousand linear feet of a gas storage reservoir shall,
     within thirty days, notify the division and the storage operator
     of such fact.
        (b)  When any person owning or operating a coal mine
     hereafter expects that within the ensuing nine months period
     such coal mine will be extended to a point which will be within
     two thousand linear feet of any storage reservoir, he shall
     notify the division and the storage operator in writing of such
     fact.
        (c)  Any person hereafter intending to establish or
     reestablish an operating coal mine which, when established or
     reestablished, will be over a storage reservoir or within two
     thousand linear feet of a storage reservoir or which, upon being
     established or reestablished, may, within nine months
     thereafter, be expected to be within two thousand linear feet of
     a storage reservoir shall notify the division and the storage
     operator, in writing, before doing so and such notice shall
     include the date on which it is intended the operating coal mine
     will be established or reestablished.
        Any person who serves such notice of an intention to
     establish or reestablish an operating coal mine under this
     subsection, without intending in good faith to establish or
     reestablish such mine, shall be liable for continuing damages to
     any storage operator injured by the serving of such improper
     notice and shall be guilty of a misdemeanor under this article
     and subject to the same penalties as set forth in section 504.
        Section 304.  Obligations to be Performed by Persons
     Operating Storage Reservoirs.--(a)  Any person who, on the
     effective date of this act, is operating a storage reservoir
     which underlies or is within two thousand linear feet of an
     operating coal mine which is operating in a coal seam that
     extends over the storage reservoir or the reservoir protective
     area, shall:
        (1)  Use every known method which is reasonable under the
     circumstances for discovering and locating all wells which have
     or may have been drilled into or through the storage stratum in
     that acreage which is within the outside coal boundaries of such
     operating coal mine and which overlies the storage reservoir or
     the reservoir protective area.
        (2)  Plug or recondition in the manner provided by subsection
     (c) of section 206 and subsection (e) of this section, all known
     wells (except to the extent otherwise provided in subsections
     (e), (f), (g) and (h) of this section) drilled into or through
     the storage stratum and which are located within that portion of
     the acreage of the operating coal mine overlying the storage
     reservoir or the reservoir protective area: Provided, however,
     That where objection is raised as to the use of any well as a
     storage well and after a conference or hearing in accordance
     with section 502, it is determined, taking into account all the
     circumstances and conditions that such well should not be used
     as a storage well, such well shall be plugged: Provided,
     however, That, if in the opinion of the storage operator the
     well to which such objection has been raised may at some future
     time be used as a storage well, the storage operator may
     recondition and inactivate such well instead of plugging it, if
     such alternative is approved by the division after taking into
     account all of the circumstances and conditions.
        The requirements of clause (2) of this subsection shall be
     deemed to have been fully complied with if, as the operating
     coal mine is extended, all wells which from time to time come
     within the acreage described in said clause (2) are
     reconditioned or plugged as provided in subsections (e) or (f)
     of this section and in subsection (c) of section 206 so that by
     the time the coal mine has reached a point within two thousand
     linear feet of any such wells, they will have been reconditioned
     or plugged so as to meet the requirements of said subsections
     (e) or (f) and of subsection (c) of section 206.
        (b)  Any person operating a storage reservoir referred to in
     subsection (a) of this section shall, within sixty days after
     the effective date of this act, file with the division and
     furnish a copy to the person operating the affected operating
     coal mine a verified statement setting forth:
        (1)  That the map and any supplemental maps required by
     subsection (a) of section 301 have been prepared and filed in
     accordance with section 301.
        (2)  A detailed explanation of what the storage operator has
     done to comply with the requirements of clauses (1) and (2) of
     subsection (a) of this section and the results thereof.
        (3)  Such additional efforts, if any, as the storage operator
     is making and intends to make to locate all oil and gas wells.
        (4)  Any additional wells that are to be plugged or
     reconditioned to meet the requirements of clause (2) of
     subsection (a) of this section.
        If such statement is not filed by the storage reservoir
     operator within the time specified herein, the division shall
     summarily order such operator to file such statement.
        (c)  Within one hundred twenty days after the receipt of any
     such statement, the division may and it shall, if so requested
     by either the storage operator or the coal operator affected,
     direct that a conference be held in accordance with section 502
     to determine whether the information as filed indicates that the
     requirements of section 301 and of subsection (a) of this
     section have been fully complied with. At such conference, if
     any person shall be of the opinion that such requirements have
     not been fully complied with, the parties shall attempt to agree
     on what additional things are to be done and the time within
     which they are to be completed, subject to the approval of the
     division to meet the said requirements.
        If such agreement cannot be reached, the division shall
     direct that a hearing be held in accordance with section 502. At
     such hearing the division shall determine whether the
     requirements of section 301 and of subsection (a) of this
     section have been met and shall issue an order setting forth
     such determination. If the division shall determine that any of
     the said requirements have not been met, the order shall specify
     in detail both the extent to which such requirements have not
     been met and the things which the storage operator must do to
     meet such requirements. The order shall grant to the storage
     operator such time as is reasonably necessary to complete each
     of the things which he is directed to do. If, in carrying out
     said order, the storage operator encounters conditions which
     were not known to exist at the time of the hearing and which
     materially affect the validity of said order or the ability of
     the storage operator to comply with the order, the storage
     operator may apply for a rehearing or modification of said
     order.
        (d)  Whenever in compliance with subsection (a) of this
     section, a storage operator after the filing of the statement
     provided for in subsection (b) of this section, plugs or
     reconditions a well, he shall so notify the division and the
     coal operator affected, in writing, setting forth such facts as
     will indicate the manner in which the plugging or reconditioning
     was done. Upon receipt thereof, the coal operator affected or
     the division may request a conference or hearing in accordance
     with section 502.
        (e)  In order to meet the requirements of subsection (a) of
     this section, wells which are to be plugged shall be plugged in
     the manner specified in subsection (c) of section 206. When a
     well, located within the storage reservoir or the reservoir
     protective area, has been plugged prior to the enactment of this
     act and on the basis of the data information and other evidence
     submitted to the division, it is determined that (1) such
     plugging was done in the manner required in subsection (c) of
     section 206, or in a manner approved as an alternate method in
     accordance with section 207 and (2) said plugging is still
     sufficiently effective to meet the requirements of this act, the
     obligations imposed by subsection (a) of this section as to
     plugging said well shall be considered fully satisfied.
        (f)  In order to meet the requirements of subsection (a) of
     this section, wells which are to be reconditioned shall be
     cleaned out from the surface through the storage horizon and the
     following casing strings shall be pulled and replaced with new
     casing, using the same procedure as is applicable to drilling a
     new well as provided for in this act, (1) the producing casing,
     (2) the largest diameter casing passing through the lowest
     workable coal seam unless such casing extends at least twenty-
     five feet below the bottom of such coal seam and is determined
     to be in good physical condition: Provided, however, That the
     storage operator may, instead of replacing the largest diameter
     casing, replace the next largest casing string if such casing
     string extends at least twenty-five feet below the lowest
     workable coal seam and (3) such other casing strings which are
     determined not to be in good physical condition. In the case of
     wells to be used for gas storage, the annular space between each
     string of casing and the annular space behind the largest
     diameter casing to the extent possible, shall be filled to the
     surface with cement or aquagel or such equally nonporous
     material as is approved by the division pursuant to section 207.
     At least fifteen days prior to the time when a well is to be
     reconditioned, the storage operator shall give notice thereof to
     the coal operator or owner and to the division, setting forth in
     such notice the manner in which it is planned to recondition
     such well and any pertinent data known to the storage operator
     which will indicate the then existing condition of such well. In
     addition, the storage operator shall give the coal operator or
     owner and such representative of the division as the deputy
     secretary shall have designated at least seventy-two hours
     notice of the time when such reconditioning is to begin. The
     coal operator or owner shall have the right to file, within ten
     days after the receipt of the first notice required herein,
     objections to the plan of reconditioning as submitted by the
     storage operator. If no such objections are filed or if none is
     raised by the division, within such ten day period, the storage
     operator may proceed with the reconditioning in accordance with
     the plan as submitted. If any such objections are filed or are
     made by the division, the division shall fix a time and place
     for a conference in accordance with section 502, at which
     conference the storage operator and the person who has filed
     such objections shall endeavor to agree upon a plan of
     reconditioning which meets the requirements herein and which
     will satisfy such objections. If no plan is approved at such
     conference, the division shall direct that a hearing be held in
     accordance with section 502 and after such hearing shall, by an
     appropriate order, determine whether the plan as submitted meets
     the requirements set forth herein or what changes, if any,
     should be made to meet such requirements. If, in reconditioning
     a well in accordance with said plan, physical conditions are
     encountered which justify or necessitate a change in said plan,
     the storage operator or the coal operator may request that the
     plan be changed. If said parties cannot agree upon such change,
     the division shall arrange for a conference or hearing in
     accordance with section 502 to determine the matter in the same
     manner as set forth herein in connection with original
     objections to said plan. Application may be made to the division
     in the manner prescribed in section 207 for approval of an
     alternative method of reconditioning a well. When a well located
     within the storage reservoir or the reservoir protective area
     has been reconditioned prior to the enactment of this act, or
     was so drilled and equipped previously and on the basis of the
     data, information and other evidence submitted to the division,
     it is determined that:
        (1)  Such reconditioning or previous drilling and equipping
     was done in the manner required in this subsection or in a
     manner approved as an alternative method in accordance with
     section 207.
        (2)  Such reconditioning or previous drilling and equipping
     is still sufficiently effective to meet the requirements of this
     act, the obligations imposed by subsection (a) as to
     reconditioning said well shall be considered fully satisfied.
     Where a well requires emergency repairs, this subsection shall
     not be construed to require the storage operator to give the
     notices specified herein before making such repairs.
        (g)  When a well located within the reservoir protective area
     is a producing well in a stratum below the storage stratum the
     obligations imposed by subsection (a) of this section shall not
     begin until such well ceases to be a producing well.
        (h)  When a well within a storage reservoir or the reservoir
     protective area penetrates the storage stratum but does not
     penetrate the coal seam being mined by an operating coal mine,
     the division may, upon application of the operator of such
     storage reservoir, exempt such well from the requirements of
     this section. Either party affected may request a conference and
     hearing with respect to the exemption of any such well in
     accordance with section 502.
        (i)  In fulfilling the requirements of clause (2) of
     subsection (a) of this section with respect to a well within the
     reservoir protective area, the storage operator shall not be
     required to plug or recondition such well until he has received
     from the coal operator written notice that the mine workings
     will, within the period stated in such notice, be within two
     thousand linear feet of such well. Upon the receipt of such
     notice, the storage operator shall use due diligence to complete
     the plugging or reconditioning of such well in accordance with
     the requirements of this section and of subsection (c) of
     section 206. If the said mine workings do not, within a period
     of three years after said well has been plugged, come within two
     thousand linear feet of said well, the coal operator shall
     reimburse the storage operator for the cost of said plugging,
     provided such well is still within the reservoir protective area
     as of that time.
        (j)  When retreat mining approaches a point where within
     ninety days it is expected that such retreat work will be at the
     location of the pillar surrounding an active storage well, the
     coal operator shall give written notice of such approach to the
     storage operator and, by agreement, said parties shall determine
     whether it is necessary or advisable to inactivate effectively
     said well temporarily. The well shall not be reactivated until a
     reasonable period has elapsed, such reasonable period to be
     determined by said parties. In the event that said parties
     cannot agree upon either of the foregoing matters, such question
     shall be submitted to the division for decision in accordance
     with section 502. The number of wells required to be temporarily
     inactivated during the retreat period shall not be such as to
     materially affect the efficient operation of such storage pool.
     This provision shall not preclude the temporary inactivation of
     a particular well where the practical effect of inactivating
     such well is to render the pool temporarily inoperative.
        (k)  The requirements of subsections (a), (l) and (m) of this
     section shall not apply to the injection of gas into any stratum
     when the sole purpose of such injection (such purpose being
     herein referred to as testing) is to determine whether the said
     stratum is suitable for storage purposes: Provided, however,
     That such testing shall be conducted only in compliance with the
     following requirements:
        (1)  The person testing or proposing to test shall comply
     with all of the provisions and requirements of section 301 and
     shall verify the statement required to be filed thereby.
        (2)  If any part of the proposed storage reservoir is under
     or within two thousand linear feet of an operating coal mine
     which is operating in a coal seam that extends over the proposed
     storage reservoir or the reservoir protective area, the storage
     operator shall give at least six months' written notice to the
     division and to the coal operator of the fact that injection of
     gas for testing purposes is proposed.
        (3)  The coal operator affected may, at any time, file
     objections with the division in accordance with subsection (h)
     of section 501. If any such objections are filed by the coal
     operator, or if the division shall have any objections, the
     division shall fix a time and place for a conference in
     accordance with section 502, not more than ten days from the
     date of the notice to the storage operator, at which conference
     the storage operator and the person who has filed such
     objections shall attempt to agree, subject to the approval of
     the division, on the questions involved. If such agreement
     cannot be reached at such conference, the division shall direct
     that a hearing be held in accordance with section 502. At such
     hearing, the division shall determine and set forth in an
     appropriate order, the conditions and requirements which it
     shall deem necessary or advisable in order to prevent gas from
     such storage reservoir from entering any operating coal mine.
     The storage operator shall comply with such conditions and
     requirements throughout the period of the testing operations. In
     determining such conditions and requirements, the division shall
     take into account the extent to which the matters referred to in
     subsection (a) of this section have been performed. If, in
     carrying out said order, either the storage operator or the coal
     operator encounters or discovers conditions which were not known
     to exist at the time of the hearing and which materially affect
     said order or the ability of the storage operator to comply with
     the order, either operator may apply for a rehearing or
     modification of said order.
        (4)  Where, at any time, a proposed storage reservoir being
     tested comes under or within two thousand linear feet of an
     operating coal mine, either because of the extension of the
     storage reservoir being tested or because of the extension or
     establishment or reestablishment of the operating coal mine,
     then and at the time of any such event, the requirements of this
     subsection shall become applicable to such testing:
        (l)  Any person who, after the effective date of this act,
     proposes to establish, a storage reservoir under or within two
     thousand linear feet of an operating coal mine which is
     operating in a coal seam that extends over the storage reservoir
     or the reservoir protective area shall, prior to establishing
     such reservoir in addition to complying with the requirements of
     section 301 and subsection (a) of this section, file the
     verified statement required by subsection (b) of this section
     and fully comply with such order or orders, if any, as the
     division may issue in the manner provided for under subsection
     (b) or (c) of this section before beginning the operation of
     such storage reservoir. After the person proposing to operate
     such storage reservoir shall have complied with such
     requirements and shall have thereafter begun to operate such
     reservoir, he shall continue to be subject to all of the
     provisions of this article.
        (m)  When a gas storage reservoir (1) is in operation on
     effective date of this act and at any time thereafter, it is
     under or within two thousand linear feet of an operating coal
     mine or (2) when a gas storage reservoir is put in operation
     after the effective date of this act and at any time after such
     storage operations begin, it is under or within two thousand
     linear feet of an operating coal mine, then and in either such
     event, the storage operator shall comply with all of the
     provisions of this section, except that the time for filing the
     verified statement under subsection (b) shall be sixty days
     after the date stated in the notice filed by the coal operator
     under subsections (b) or (c) of section 303 as to when the
     operating coal mine will be at a point within two thousand
     linear feet of such reservoir: Provided, however, That if the
     extending of the projected workings or the proposed
     establishment or reestablishment of the operating coal mine is
     delayed after the giving of the notice provided in subsection
     (b) and (c) of section 303, the coal operator shall give notice
     of such delay to the division and the division shall, upon the
     request of the storage operator, extend the time for filing such
     statement by the additional time which will be required to
     extend or establish or reestablish such operating coal mine to a
     point within two thousand linear feet of such reservoir. Such
     verified statement shall also indicate that the map referred to
     in subsection (a) of section 301 has been currently amended as
     of the time of the filing of such statement. The person
     operating any such storage reservoir shall continue to be
     subject to all of the provisions of this article.
        (n)  If, in any proceeding under this act, the division shall
     determine that any operator of a storage reservoir has failed to
     carry out any lawful order of the division issued under this
     act, the division shall have authority to require such storage
     operator to suspend the operation of such reservoir and to
     withdraw the gas therefrom until such violation is remedied. In
     such an event, the gas shall be withdrawn under the following
     conditions. The storage operator shall remove the maximum amount
     of gas which is required by the division to be removed from the
     storage reservoir that can be withdrawn in accordance with
     recognized engineering and operating procedures and shall
     proceed with due diligence in so far as existing facilities used
     to remove gas from the reservoir will permit.
        (o)  In addition to initial compliance with the other
     provisions of this act and any lawful orders issued thereunder,
     it shall be the duty, at all times, of the person owning or
     operating any storage reservoir which is subject to the
     provisions of this article, to keep all wells drilled into or
     through the storage stratum in such condition and to operate the
     same in such manner as to prevent the escape of gas into any
     coal mine therefrom and to operate and maintain such storage
     reservoir and its facilities in such manner and at such
     pressures as will prevent gas from escaping from such reservoir
     or its facilities into any coal mine: Provided, That this duty
     shall not be construed to include the inability to prevent the
     escape of gas where such escape results from an act of God or an
     act of any person not under the control of the storage operator
     other than in connection with any well which the storage
     operator has failed to locate and to make known to the division:
     Provided, however, That, if any escape of gas into a coal mine
     does result from an act of God or an act of any person not under
     the control of the storage operator, the storage operator shall
     be under the duty of taking such action thereafter as is
     reasonably necessary to prevent further escape of gas into the
     coal mine.
        Section 305.  Inspection of Facilities and Records, Reliance
     on Maps, Burden of Proof.--(a)  In determining whether a
     particular coal mine or operating coal mine is or will be within
     any distance material under this act from any storage reservoir,
     the owner or operator of such coal mine and the storage operator
     may rely on the most recent map of the storage reservoir or coal
     mine filed by the other with the division.
        (b)  In any proceeding under this act where the accuracy of
     any map or data filed by any person pursuant to the requirements
     of this act is in issue, the person filing the same shall, at
     the request of any party to such proceeding, be required to
     disclose the information and method used in compiling such map
     and data and such information as is available to such person
     that might affect the current validity of such map or data. If
     any material question is raised in such proceeding as to the
     accuracy of such map or data with respect to any particular
     matter or matters contained therein, the person filing such map
     or data shall then have the burden of proving the accuracy of
     the map or data with respect to such matter or matters.
        (c)  The person operating any storage reservoir affected by
     the terms of this act shall, at all reasonable times, be
     permitted to inspect the applicable records and facilities of
     any coal mine overlying such storage reservoir or the reservoir
     protective area and the person operating any such coal mine
     affected by the terms of this act shall, similarly at all
     reasonable times, be permitted to inspect the applicable records
     and facilities of any such storage reservoir underlying any such
     coal mine. In the event that either such storage operator or
     coal operator shall refuse to permit any such inspection of
     records or facilities, the division shall, on its own motion or
     on application of the party seeking the inspection after
     reasonable written notice and a hearing thereon if requested by
     either of the parties affected, make an order providing for such
     inspection.
        Section 306.  Exemptions.--(a)  The provisions of this
     article shall not apply to the following types of coal mines.
        (1)  Strip mines and auger mines operating from the surface.
        (2)  Mines to which the provisions of the act of June nine,
     one thousand nine hundred eleven (Pamphlet Laws 756), as
     amended, do not apply as provided in section three of Article
     XXVIII thereof and mines to which the provisions of the act of
     June two, one thousand eight hundred ninety-one (Pamphlet Laws
     176), as amended, do not apply as provided in section one of
     Article I thereof.
        (b)  Injection of gas for storage purposes in any workable
     coal seam whether or not such seam is being or has been mined,
     shall be prohibited. Nothing in this article shall be construed
     to prohibit the original extraction of natural gas, crude oil or
     coal.

                                ARTICLE IV
                              EMINENT DOMAIN

        Section 401.  Appropriation of Interests in Real Property.--
     (a)  Any and all corporations empowered to transport, sell or
     store, natural or manufactured gas, within this Commonwealth,
     shall have the right, subject to the following limitations, to
     appropriate interests in real property for the injection,
     storage and removal from storage of natural or manufactured gas
     in any stratum which is or previously has been commercially
     productive of natural gas: Provided, That the right of eminent
     domain shall not be exercised to acquire for the purpose of gas
     storage, (1) any interest in any geological stratum within the
     area of the proposed storage reservoir, unless the original
     recoverable oil or gas reserves therein have been depleted or
     exhausted by at least eighty per centum and unless and until the
     condemnor shall have acquired the right by grant, lease or other
     agreement to store gas in the said geological stratum underlying
     at least seventy-five per centum of the area of the proposed
     storage reservoir, or (2) any interest in any geological stratum
     within the area of the proposed storage reservoir owned directly
     or indirectly by a gas company or by a person engaged in the
     local distribution of natural gas which interest is being used
     by such gas company or by such person for present storage of gas
     in the performance of service to customers within its service
     area.
        (b)  This act shall be construed to authorize appropriation
     of the stratum to be used for storage any gas reserve remaining
     therein and any active or abandoned well or wells drilled into
     said stratum and further to authorize the appropriation of the
     right to enter upon and use the surface of lands for the purpose
     of locating, reconditioning, maintaining, plugging or replugging
     any active or abandoned wells or operating any wells drilled
     into or through said storage stratum within the storage
     reservoir boundary or within the reservoir protective area. This
     act shall not be construed, however, to preclude the owner of
     nonstorage strata from the drilling of wells for the purpose of
     producing oil or gas from any stratum above or below the storage
     stratum appropriated by such corporation, but the corporation
     appropriating or holding storage rights shall have access to and
     the right to inspect and examine any such drilling or completed
     well and the drilling logs and all other records relating to the
     drilling, equipping or operating of such well for the purpose of
     determining whether the storage stratum is being adequately
     protected to prevent the escape of gas stored therein. This act
     shall not authorize the appropriation of any coal or coal
     measure whether or not being mined or any interest therein.
        (c)  Any person drilling, operating, using or plugging any
     well through any stratum which has been appropriated under this
     act shall so drill, case, equip, operate or plug the same as to
     prevent any avoidable escape of gas that may be stored in the
     storage stratum. Upon failure, neglect or refusal of such person
     or persons to comply with this section, the court of common
     pleas of the county in which the tract of land is situated shall
     have the power to compel compliance by injunction or to grant
     other appropriate relief upon action brought by the corporation
     storing gas in the storage stratum.
        (d)  Prior to any appropriation, the corporation shall
     attempt to agree with the owner or owners of the interests in
     real property involved as to the damage properly payable for the
     property rights or interests to be appropriated in or on his,
     her or their property, if such owner or owners can be found and
     are sui juris. Failing to agree, the corporation shall tender to
     the property owner or owners a surety bond to secure him, her or
     them in the payment of damages. If the owner or owners refuse to
     accept said bond or cannot be found or are not sui juris, said
     bond, after reasonable notice to the property owner or owners by
     advertisement or otherwise, shall then be presented for approval
     to the court of common pleas of the county in which the tract of
     land is situated. Upon the approval of the bond and its being
     filed in said court, the right of the corporation to enter upon
     the enjoyment of the powers given it by this act to store gas
     and to enter on the property for the purpose of locating,
     reconditioning, maintaining, plugging or replugging any active
     or abandoned wells or operating any wells drilled into or
     through said storage stratum within the storage reservoir
     boundary or within the reservoir protective area shall be
     complete.
        (e)  Upon petition of either the property owner or owners or
     the corporation exercising the right of eminent domain
     hereunder, said court shall appoint three disinterested
     freeholders of the county to serve as viewers to assess the
     damages proper to be paid to the property owner or owners for
     the rights appropriated by said corporation and shall fix a time
     for their meeting of which notice shall be given to both
     parties. After the viewers have filed their report with the
     court, said court shall fix reasonable compensation for the
     service of said viewers.
        (f)  Either party may appeal from the report of the viewers
     within twenty days after the filing thereof with the court of
     common pleas and have a jury trial and the right of appeal as in
     ordinary cases.
        (g)  Nothing contained in this section shall relieve the
     person operating a storage reservoir from the requirements of
     this act.

                                ARTICLE V
                         MISCELLANEOUS PROVISIONS

        Section 501.  Oil and Gas Division.--(a)  There is hereby
     created a division of the Department of Mines to be known as the
     Oil and Gas Division, which division shall have power and
     authority to execute and carry out the provisions of this act in
     the manner provided herein. The division shall be under the
     immediate supervision of a Deputy Secretary of Mines for Oil and
     Gas, who shall be appointed by the Secretary of Mines, with the
     approval of the Governor, and who shall be under the supervision
     and direction of the Secretary of Mines. The deputy secretary,
     at the time of his appointment, shall be a person informed on
     the subjects of coal mining and oil and gas production and
     storage and shall receive such compensation as may be fixed by
     the Secretary of the Department of Mines, with the approval of
     the Governor.
        (b)  The deputy secretary shall serve, on behalf of the
     Secretary of Mines, as hearing officer at all hearings or
     conferences conducted by the division or, in his absence or
     inability to act, such other qualified representative of the
     division as may be designated, in writing, by the secretary or
     said deputy secretary.
        (c)  The Secretary of Mines shall appoint and fix the
     compensation of such additional experts, engineers, geologists,
     inspectors, investigators, clerks and other employes as may be
     necessary for the proper conduct of the work of the division:
     Provided, That the Secretary of Mines shall appoint or retain on
     a consulting basis at least one competent engineer or geologist
     with a degree in engineering or geology from a recognized
     institution of learning and at least one competent mining
     engineer with a degree in engineering from a recognized
     institution of learning and each having at least four years
     practical experience in their respective fields. At all hearings
     under subsection (c) of section 304, there shall be present in
     addition to the person conducting said hearing at least one of
     the aforesaid gas engineers or geologists and at least one of
     the said coal mining engineers who shall consult with the person
     conducting said hearing and make recommendations to him
     respecting the matter under consideration.
        (d)  Except as otherwise specifically provided in this act,
     the division and its employes shall be subject to all the
     provisions of "The Administrative Code of 1929," approved April
     nine, one thousand nine hundred twenty-nine (Pamphlet Laws 177),
     its amendments and supplements, which apply generally to
     administrative departments and offices.
        (e)  The division may review the maps and data filed under
     sections 301 and 302 hereof, for the purpose of determining the
     accuracy thereof. Where any material question is raised by any
     interested storage operator or coal operator or owner as to the
     accuracy of any such map or data, the division shall hold
     hearings thereon and shall, by an appropriate order, require the
     person filing such map or data to correct the same, if they are
     found to be erroneous.
        (f)  It shall be the duty of the division to receive and keep
     in a safe place for public inspection any map, data, report,
     well log, notice or other writing required to be filed with it
     pursuant to the provisions of this act. The division shall keep
     such indices of all such information as will enable any person
     using the same to readily locate such information either by the
     identity of the person who filed the same, or by the person or
     persons affected by such filing, or by the geographic location
     of the subject matter by political subdivision. The division
     shall also keep a docket for public inspection of all
     proceedings in which shall be entered the dates of any notices,
     the names of all persons notified and their address, the dates
     of hearings, conferences and all orders, decrees, decisions,
     determinations, rulings or other actions issued or taken by the
     division and such docket shall constitute the record of each and
     every proceeding before the division.
        (g)  The division shall have authority to make any
     inspections and investigations of records and facilities, which
     it shall deem necessary or desirable to perform its functions
     under this act.
        (h)  Where, in any section of this act, provision is made for
     the filing of objections, such objections shall be filed, in
     writing, with the division by the person entitled to file the
     same or by the division and shall state as definitely as is
     reasonably possible the reasons for such objections. The person
     filing such objections shall send a copy thereof, by registered
     mail, to the person or persons affected thereby.
        Section 502.  Conferences, Hearings and Appeals.--(a)  The
     division or any person having a direct interest in the subject
     matter of this act may, at any time, request that a conference
     be held for the purpose of discussing and endeavoring to resolve
     by mutual agreement any matter arising under the provisions of
     this act. Prompt notice of any such conference shall be given by
     the division to all such interested parties. At such conference
     a representative of the division shall be in attendance and the
     division may make such recommendations as it deems appropriate.
     Any agreement reached at such conference shall be consistent
     with the requirements of this act and, if approved by such
     representative of the division, it shall be reduced to writing
     and shall be effective, unless reviewed and rejected by the
     division within ten days after the close of the conference. The
     record of any such agreement approved by the division shall be
     kept on file by the division with copies furnished to the
     parties. Such a conference shall be held in all cases prior to
     conducting any hearing under this section.
        (b)  All hearings before the division shall be public and
     shall be conducted in accordance with such regulations and such
     provisions as to reasonable notice as the division may
     prescribe. Consistent with the requirements for reasonable
     notice, all hearings under this act shall be held by the
     division promptly. All testimony taken at such hearings shall be
     under oath and shall be recorded by a reporter appointed by the
     division and the parties may appear and be heard in person or by
     attorney. The division may present at such hearing any evidence
     which is material to the matter under consideration and which
     has come to the division's attention in any investigation or
     inspection made pursuant to provisions of this section.
        (c)  After the conclusion of hearings, the division shall
     make and file its findings and order with its opinion, if any. A
     copy of such order shall be served, by registered mail, upon the
     person against whom it runs or his attorney and notice thereof
     shall be given to the other parties to the proceedings or their
     attorney.
        (d)  The division may, at any time after notice and after
     opportunity to be heard as provided in this section, rescind or
     amend any approved agreement or order made by it. Any order
     rescinding or amending a prior agreement or order shall, when
     served upon the person affected and after notice thereof is
     given to the other parties to the proceedings, have the same
     effect as is herein provided for original orders but no such
     order shall affect the legality or validity of any acts done by
     such person in accordance with the prior agreement or order
     before receipt by such person of the notice of such change.
        (e)  The division shall have the power in any part of the
     Commonwealth to subpoena witnesses, to administer oaths, to
     examine witnesses or to take such testimony or compel the
     production of such books, records, maps, plats, papers,
     documents and other writings as it may deem necessary or proper
     in and pertinent to any proceedings, investigation or hearing
     held or had by it. In case of refusal to obey any subpoena
     served upon any person, any court shall, on application of the
     deputy secretary or his authorized representative, have power to
     enforce such subpoenas in contempt proceedings. The fees for
     serving a subpoena shall be the same as those paid sheriffs for
     similar services. ((e) repealed in part Apr. 28, 1978, P.L.202,
     No.53)
        (f)  The division or any party to proceedings before the
     division may cause the deposition of witnesses, residing within
     or without the Commonwealth to be taken in the manner prescribed
     by law for taking depositions in civil actions.
        (g)  Witnesses who are summoned before the division shall be
     paid the same fees as are paid to witnesses in the courts of
     record of general jurisdiction. Witnesses whose depositions are
     taken pursuant to the provisions of this act and the officers
     taking the same shall be entitled to the same fees as are paid
     for like services in such courts.
        (h)  No person shall be excused from testifying or from
     producing any book, document, map, plat or paper in any
     investigation or inquiry by or hearing before the division when
     ordered to do so upon the ground that the testimony or evidence,
     book, documents, map, plat, paper or other writings required may
     tend to incriminate him or subject him to penalty or forfeiture,
     but no person shall be prosecuted, punished or subjected to any
     forfeiture or penalty for or on account of any act, transaction,
     matter or thing concerning which he shall have been compelled,
     under objection, to testify or produce documentary evidence:
     Provided, That no person so testifying shall be exempt from
     prosecution or punishment for any perjury committed by him in
     his testimony.
        (i)  ((i) repealed Apr. 28, 1978, P.L.202, No.53)

Act text part 2
        (j)  ((j) repealed Apr. 28, 1978, P.L.202, No.53)
        (k)  ((k) repealed Apr. 28, 1978, P.L.202, No.53)
        (l)  ((l) repealed June 3, 1971, P.L.118, No.6 and Apr. 28,
     1978, P.L.202, No.53)
        (m)  ((m) repealed Apr. 28, 1978, P.L.202, No.53)
        (n)  Whenever a coal or gas operator is to be given notice by
     the division of any proceeding to be held under this section,
     the division shall also send simultaneously a copy of such
     notice to the collective bargaining representative of the
     employes of the coal operator.

        Compiler's Note:  Section 508(a) of Act 223 of 1970 provided
            that the jurisdiction of the courts named in section 502
            is transferred to and vested in the Commonwealth Court
            and provided that section 502 is repealed insofar as it
            relates to the Court of Common Pleas of Dauphin County.
        Compiler's Note:  Section 14(a) of Act 185 of 1969 provided
            that the jurisdiction of the courts named in section 502
            is vested in the Commonwealth Court and provided that
            section 502 is repealed insofar as it relates to the
            Court of Common Pleas of Dauphin County.
        Section 503.  Enforcement.--(a)  The division or any person
     having a direct interest in the subject matter of this act may
     complain, in writing, setting forth that any person is violating
     or is about to violate any provisions of this act or has done or
     is about to do any act, matter or thing therein prohibited or
     declared to be unlawful or has failed, omitted, neglected, or
     refuse or is about to fail, omit, neglect or refuse to perform
     any duty enjoined upon him by this act.
        Upon the filing of a complaint against any person, the
     division shall cause a copy thereof to be served upon such
     person, by registered mail, accompanied by a notice from the
     division calling upon such person to satisfy the complaint or to
     answer the same, in writing, within such reasonable time as may
     be specified by the division in such notice.
        If any person complained against, within the time specified
     by the division, shall satisfy the complaint, the division by
     order shall dismiss the complaint. If such person shall not
     satisfy the complaint within the time specified and it shall
     appear to the division from a consideration of the complaint and
     answer or otherwise that reasonable ground exists for
     investigating such complaint, it shall be the duty of the
     division to direct that a hearing be held in accordance with
     section 502. Following such hearing, the division shall, if it
     finds that the matter alleged in the complaint is not in
     violation of this act, dismiss the complaint but if the division
     should find that the complaint is justified it shall by
     appropriate order compel compliance with the act.
        (b)  Whenever the division shall be of the opinion that any
     person is violating or is about to violate any provisions of
     this act or has done or is about to do any act, matter or thing
     therein prohibited or declared to be unlawful or has failed,
     omitted, neglected or refused or is about to fail, omit, neglect
     or refuse to perform any duty, enjoined upon him by this act or
     has failed, omitted, neglected or refused or is about to fail,
     omit, neglect or refuse to obey any lawful requirement or order
     made by the division or any final judgment, order or decree made
     by any court pursuant to this act, then and in every such case,
     the division may institute in the Court of Common Pleas of
     Dauphin County or in the court of common pleas of the county or
     counties wherein the operation is situated, injunction, mandamus
     or other appropriate legal proceedings to restrain such
     violations of the provisions of this act or of orders of the
     division and to enforce obedience therewith and such courts of
     common pleas are hereby clothed with exclusive jurisdiction
     throughout the Commonwealth to hear or determine all such
     actions. No injunction bond shall be required to be filed in any
     such proceeding. Such persons or corporations as the court may
     deem necessary or proper to be joined as parties in order to
     make its judgment, order or writ effective, may be joined as
     parties. The final judgment in any such action or proceeding
     shall either dismiss the action or proceeding or direct that the
     writ of mandamus or injunction issue or be made permanent as
     prayed for in the petition or in such modified or other form as
     will afford appropriate relief. An appeal may be taken as in
     other civil actions.
        (c)  The Attorney General, in addition to the exercise of the
     powers and duties now conferred upon him by law, shall also,
     upon request of the division or upon his own motion, proceed in
     the name of the Commonwealth by mandamus, injunction or quo
     warranto or other appropriate remedy, at law or in equity, to
     restrain violations of the provisions of this act or of orders
     of the division or the judgments, orders or decrees of any court
     or to enforce obedience therewith.
        (d)  Each remedy prescribed in this section shall be deemed
     concurrent or contemporaneous with any other remedy prescribed
     herein and the existence or exercise of any one such remedy
     shall not prevent the exercise of any other such remedy.
        Section 504.  Penalties.--Any person who shall wilfully
     violate any provisions of this act or any order of the Oil and
     Gas Division, issued pursuant to the provisions of this act,
     shall be deemed guilty of a misdemeanor and, upon conviction
     thereof, shall be sentenced to pay a fine of not more than five
     hundred dollars ($500), or undergo imprisonment of not more than
     one year, or both. Each day's continuance of such violation
     shall be a separate and distinct offense. (504 amended July 31,
     1968, P.L.881, No.265)
        Section 505.  Effective Date.--This act shall take effect in
     sixty days.

                                ARTICLE VI
                    REGULATION OF CERTAIN UNDERGROUND
                            GAS STORAGE POOLS
                        NOT COVERED BY ARTICLE III
                    (Art. added Mar. 3, 1970, P.L.81,
                                  No.38)

        Section 601.  Filing of Maps and Data by Persons Operating or
     Proposing to Operate Certain Gas Storage Reservoirs.--(a)  Any
     person who, on the effective date of this article, is injecting
     gas into or storing gas in a storage reservoir not then subject
     to Article III of this act, by a process other than that of
     secondary recovery or gas recycling, shall, within such time in
     excess of sixty days as the division may fix, file with the
     division a copy of a map and certain data in the form and manner
     provided in this subsection.
        Any person who, after the effective date of this article,
     proposes to inject or store gas in a storage reservoir in an
     area not covered by Article III of this act, by a process other
     than that of secondary recovery or gas recycling, shall file the
     required map and data with the division not less than six months
     prior to the starting of actual injection or storage.
        The map provided for herein shall be prepared by a competent
     engineer or geologist. It shall show the stratum or strata in
     which the existing or proposed storage reservoir is or is to be
     located, the geographic location of the outside boundaries of
     the said storage reservoir, the location of all known oil or gas
     wells which have been drilled into or through the storage
     stratum within the reservoir or within three thousand linear
     feet thereof, indicating which of these wells have been or are
     to be cleaned out and plugged or reconditioned for storage and
     also indicating the proposed location of all additional wells
     which are to be drilled within the storage reservoir or within
     three thousand linear feet thereof.
        The following information, if available, shall be furnished
     for all known oil or gas wells which have been drilled into or
     through the storage stratum within the storage reservoir or
     within three thousand linear feet thereof, name of the operator,
     date drilled, total depth, depth of production if the well was
     productive of oil or gas, the initial rock pressure and volume,
     and a copy of the driller's log or other similar information. At
     the time of the filing of the aforesaid maps and data, such
     person shall file a detailed statement of what efforts he has
     made to determine (i) that the wells shown on said map are
     accurately located thereon and (ii) that, to the best of his
     knowledge, they are all the oil or gas wells which have ever
     been drilled into or below the storage stratum within the
     proposed storage reservoir. This statement shall also include
     information as to whether or not the initial injection is for
     testing purposes, the maximum pressure at which injection and
     storage of gas in contemplated and a detailed explanation of the
     methods to be used or which, theretofore, have been used in
     drilling, cleaning out, reconditioning and plugging wells in the
     storage reservoir. The map and data required to be filed
     hereunder shall be amended or supplemented semi-annually in case
     any material changes have occurred: Provided, however, That the
     division may require a storage operator to amend or supplement
     such map or data at more frequent intervals if material changes
     have occurred justifying such earlier filing.
        (b)  The storage operators shall give notice to the division
     of the name of each political subdivision and county in which
     said operator maintains and operates a gas storage reservoir.
        (c)  At the time of the filing of the above maps and data and
     the filing of amended or supplemented maps or data, the storage
     operator shall give written notice of said filing to such
     persons as the division may require. Such notices shall contain
     a description of the boundaries of such storage reservoir.
        (d)  For all purposes of this act, the outside boundaries of
     a storage reservoir shall be defined by the location of those
     wells around the periphery of the storage reservoir which had no
     gas production when drilled in said storage stratum: Provided,
     however, That the boundaries as thus defined shall be originally
     fixed or subsequently changed where, based (i) upon the number
     and nature of such wells, and (ii) upon the geological and
     production knowledge of the storage stratum, its character,
     permeability and distribution, and operating experience, it is
     determined in a conference or hearing under section 502 that
     modification should be made.
        (601 added Mar. 3, 1970, P.L.81, No.38)
        Section 602.  Obligations to be Performed by Persons
     Operating Certain Storage Reservoirs.--(a)  Any person who, on
     or after the effective date of this article, is operating or
     proposes to operate a storage reservoir, except one that is
     filled by the secondary recovery or gas recycling process,
     shall:
        (1)  Use every known method which is reasonable under the
     circumstances for discovering and locating all wells which have
     or may have been drilled into or through the storage reservoir.
        (2)  Plug or recondition in the manner provided in Article II
     of this act all known wells (except to the extent otherwise
     provided in subsections (b) and (c) of this section) drilled
     into or through the storage reservoir.
        (b)  In order to meet the requirements of subsection (a) of
     this section, wells which are to be plugged shall be plugged in
     the manner specified in section 206. When a well located within
     the storage reservoir area has been plugged prior to the
     enactment of this act and on the basis of the data, information
     and other evidence submitted to the division it is determined
     that (i) such plugging was done in the manner required in
     section 206 or in a manner approved as an alternative method in
     accordance with section 207, and (ii) said plugging is still
     sufficiently effective to meet the requirements of this act, the
     obligations imposed by subsection (a) of this section as to
     plugging said well shall be considered fully satisfied.
        (c)  In order to meet the requirements of subsection (a) of
     this section, wells which are to be reconditioned shall be
     cleaned out from the surface through the storage horizon and the
     producing casing and such other casing strings which are
     determined not to be in good physical condition shall be
     replaced with new casing using the same procedure as is
     applicable to drilling a new well as provided for in this act.
     In the case of wells to be used for gas storage, the annular
     space between each string of casing and the annular space behind
     the largest diameter casing to the extent possible, shall be
     filled to the surface with cement or bentonitic mud or such
     nonporous material as is approved by the division pursuant to
     section 207. At least fifteen days prior to the time when a well
     is to be reconditioned, the storage operator shall give notice
     thereof to the division, setting forth in such notice the manner
     in which it is planned to recondition such well and any
     pertinent data known to the storage operator which will indicate
     the then existing condition of such well. In addition, the
     storage operator shall give such representative of the division
     as the deputy secretary shall have designated at least seventy-
     two hours notice of the time when such reconditioning is to
     begin. If no objections are raised by the division within ten
     days, the storage operator may proceed with the reconditioning
     in accordance with the plan as submitted. If any objections are
     made by the division, the division shall fix a time and place
     for a conference in accordance with section 502 at which
     conference the storage operator and the division shall endeavor
     to agree upon a plan of reconditioning which meets the
     requirements herein and which will satisfy such objections. If
     no plan is approved at such conference, the division shall
     direct that a hearing be held in accordance with section 502 and
     after such hearing shall, by an appropriate order, determine
     whether the plan as submitted meets the requirements set forth
     herein or what changes, if any, should be made to meet such
     requirements. If, in reconditioning a well in accordance with
     said plan, physical conditions are encountered which justify or
     necessitate a change in said plan, the storage operator may
     request that the plan be changed. If the request is denied, the
     division shall arrange for a conference or hearing in accordance
     with section 502 to determine the matter in the same manner as
     set forth herein in connection with original objections to said
     plan. Applications may be made to the division in the manner
     prescribed in section 207 for approval of an alternative method
     of reconditioning a well. When a well located within the storage
     reservoir has been reconditioned prior to the enactment of this
     article, or was so drilled and equipped previously and on the
     basis of the data, information and other evidence submitted to
     the division, it is determined that:
        (1)  Such reconditioning or previous drilling and equipping
     was done in the manner required in this subsection or in a
     manner approved as an alternative method in accordance with
     section 207.
        (2)  Such reconditioning or previous drilling and equipping
     is still sufficiently effective to meet the requirements of this
     act, the obligations imposed by subsection (a) as to
     reconditioning said well shall be considered fully satisfied.
     Where a well requires emergency repairs, this subsection shall
     not be construed to require the storage operator to give the
     notices specified herein before making such repairs.
        (d)  The requirements of subsection (a) of this section shall
     not apply to the injection of gas into any stratum when the sole
     purpose of such injection (such purpose being herein referred to
     as testing) is to determine whether the said stratum is suitable
     for storage purposes: Provided, however, That such testing shall
     be conducted only in compliance with the following requirements:
        (1)  The person testing or proposing to test shall comply
     with all of the provisions and requirements of section 601 and
     shall verify the statement required to be filed thereby.
        (2)  The storage operator shall give at least six months'
     written notice to the division of the fact that injection of gas
     for testing purposes is proposed.
        (3)  If the division shall have any objections, the division
     shall fix a time and place for a conference in accordance with
     section 502, not more than ten days from the date of notice to
     the storage operator, at which conference the storage operator
     and the division shall attempt to agree, on the questions
     involved. If such agreement cannot be reached at such
     conference, the division shall direct that a hearing be held in
     accordance with section 502. At such hearing, the division shall
     determine and set forth in an appropriate order, the conditions
     and requirements which it shall deem necessary or advisable in
     order to prevent gas from escaping from such storage reservoir.
     The storage operator shall comply with such conditions and
     requirements throughout the period of the testing operations. In
     determining such conditions and requirements, the division shall
     take into account the extent to which the matters referred to in
     subsection (a) of this section have been performed. If, in
     carrying out said order the storage operator encounters or
     discovers conditions which were not known to exist at the time
     of the hearing and which materially affect said order or the
     ability of the storage operator to comply with the order, the
     operator may apply for a rehearing or modification of said
     order.
        (e)  If, in any proceeding under this act, the division shall
     determine that any operator of a storage reservoir has failed to
     carry out any lawful order of the division issued under this
     act, the division shall have authority to require such storage
     operator to suspend the operation of such reservoir and to
     withdraw the gas therefrom until such violation is remedied. In
     such an event the gas shall be withdrawn under the following
     conditions: the storage operator shall remove the maximum amount
     of gas which is required by the division to be removed from the
     storage reservoir that can be withdrawn in accordance with
     recognized engineering and operating procedures, and shall
     proceed with due diligence in so far as existing facilities used
     to remove gas from the reservoir will permit.
        (f)  In addition to initial compliance with the other
     provisions of this act and any lawful orders issued thereunder,
     it shall be the duty, at all times, of the person owning or
     operating any storage reservoir which is subject to the
     provisions of this article, to keep all wells drilled into or
     through the storage reservoir in such condition and to operate
     the same in such manner as to prevent the escape of gas
     therefrom and to operate and maintain such storage reservoir and
     its facilities in such manner and at such pressures as will
     prevent gas from escaping from such reservoir or its facilities
     but in no case shall such pressure exceed the highest rock
     pressure found to have existed during the production history of
     the reservoir, or such other higher pressure as the division may
     approve after conference or hearing under section 502 based upon
     geological and production knowledge of the reservoir, its
     character, permeability distribution and operating experience:
     Provided, That this duty shall not be construed to include the
     inability to prevent the escape of gas where such escape results
     from an act of God or an act of any person not under the control
     of the storage operator other than in connection with any well
     which the storage operator has failed to locate and to make
     known to the division: Provided, however, That, if any escape of
     gas does result from an act of God or an act of any person not
     under the control of the storage operator, the storage operator
     shall be under the duty of taking such action thereafter as is
     reasonably necessary to prevent further escape of gas.
        (602 added Mar. 3, 1970, P.L.81, No.38)

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.