Pennsylvania Act 2006-57 — HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2005-2006

act-2006-0-572006 Pa. Act 57Law

Act text
HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2005-2006
Act of Jun. 29, 2006, P.L. 220, No. 57Cl. 86

AN ACT

Providing for the highway capital budget project itemization for the fiscal year 2005-2006.

TABLE OF CONTENTS

CHAPTER 1

GENERAL PROVISIONS

Section 101. Short title.

Section 102. Total authorization.

Section 103. Itemization of public highway projects.

CHAPTER 3

ITEMIZED PROJECTS

Section 301. Adams County.

Section 302. Allegheny County.

Section 303. Armstrong County.

Section 304. Beaver County.

Section 305. Bedford County.

Section 306. Berks County.

Section 307. Blair County.

Section 308. Bradford County.

Section 309. Bucks County.

Section 310. Butler County.

Section 311. Cambria County.

Section 312. Cameron County.

Section 313. Carbon County.

Section 314. Centre County.

Section 315. Chester County.

Section 316. Clarion County.

Section 317. Clearfield County.

Section 318. Clinton County.

Section 319. Columbia County.

Section 320. Crawford County.

Section 321. Cumberland County.

Section 322. Dauphin County.

Section 323. Delaware County.

Section 324. Elk County.

Section 325. Erie County.

Section 326. Fayette County.

Section 327. Forest County.

Section 328. Franklin County.

Section 329. Fulton County.

Section 330. Greene County.

Section 331. Huntingdon County (Reserved).

Section 332. Indiana County.

Section 333. Jefferson County.

Section 334. Juniata County (Reserved).

Section 335. Lackawanna County.

Section 336. Lancaster County.

Section 337. Lawrence County.

Section 338. Lebanon County.

Section 339. Lehigh County.

Section 340. Luzerne County.

Section 341. Lycoming County.

Section 342. McKean County.

Section 343. Mercer County.

Section 344. Mifflin County.

Section 345. Monroe County.

Section 346. Montgomery County.

Section 347. Montour County.

Section 348. Northampton County.

Section 349. Northumberland County.

Section 350. Perry County (Reserved).

Section 351. Philadelphia County.

Section 352. Pike County.

Section 353. Potter County.

Section 354. Schuylkill County.

Section 355. Snyder County.

Section 356. Somerset County.

Section 357. Sullivan County.

Section 358. Susquehanna County.

Section 359. Tioga County.

Section 360. Union County.

Section 361. Venango County.

Section 362. Warren County (Reserved).

Section 363. Washington County.

Section 364. Wayne County (Reserved).

Section 365. Westmoreland County.

Section 366. Wyoming County (Reserved).

Section 367. York County.

Section 368. Statewide projects.

CHAPTER 5

(RESERVED)

CHAPTER 7

MISCELLANEOUS PROVISIONS

Section 701. Federal funds.

Section 702. Allocation of funds.

Section 703. Estimated useful life.

Section 704. Effective date.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

CHAPTER 1

GENERAL PROVISIONS

Section 101. Short title.

This act shall be known and may be cited as the Highway Capital Budget Project Itemization Act of 2005-2006.

Section 102. Total authorization.

The total authorization for the capital projects itemized in Chapter 3 and to be constructed by the Department of Transportation, its successors or assigns and to be financed from current revenues of the Motor License Fund shall be $1,713,261,000.

Section 103. Itemization of public highway projects.

Additional capital projects in the category of public highway projects to be constructed by the Department of Transportation, its successors or assigns and to be financed from current revenues of the Motor License Fund are itemized in Chapter 3, together with their respective estimated financial costs.

CHAPTER 3

ITEMIZED PROJECTS

ProjectTotal Project Allocation

Section 301. Adams County.

Projects are as follows:

(1) SR 94 and SR 1019, Realignment of SR 94 and SR 1029, Berlin Road Intersection, Hamilton Township4,200,000

(Base Project Allocation - $3,000,000)

(Land Allocation - $600,000)

(Design and Contingencies - $600,000)

(2) SR 234, Widening, Safety Improvements and Signalization along SR 234 to SR 3001 and SR 3001 to North Oxford Road, Tyrone and Huntington Townships3,200,000

(Base Project Allocation - $1,750,000)

(Land Allocation - $1,200,000)

(Design and Contingencies - $250,000)

(3) US 15, Construction of Interchange at US 15 and Hunterstown Road, Strabane Township13,200,000

(Base Project Allocation - $10,100,000)

(Design and Contingencies - $3,100,000)

Section 302. Allegheny County.

Projects are as follows:

(1) SR 8, Highway Restoration, SR 8 Segment 410 to Segment 461, Richland Township540,000

(Base Project Allocation - $540,000)

(2) SR 8, Widening and Adding Turning Lanes to SR 8 at Ewalt Road1,550,000

(Base Project Allocation - $1,448,000)

(Land Allocation - $6,000)

(Design and Contingencies - $96,000)

(3) SR 19, Highway Restoration, SR 19 Segment 60 to Segment 91, Bethel Park Borough, Mount Lebanon and Upper St. Clair Townships320,000

(Base Project Allocation - $320,000)

(4) SR 19, Widening and Resurfacing 2.25 Miles9,800,000

(Base Project Allocation - $9,800,000)

(5) SR 22, Highway Restoration, SR 22 Segment 170 to Segment 221, Collier and Robinson Townships400,000

(Base Project Allocation - $400,000)

(6) SR 22/286, Cloverleaf Intersection10,000,000

(Base Project Allocation - $10,000,000)

(7) SR 28, I-76 to Butler County Line, Roadway, Bridge, Interchange Improvements and Interchange Construction31,700,000

(Base Project Allocation - $22,500,000)

(Land Allocation - $2,600,000)

(Design and Contingencies - $6,600,000)

(8) SR 48, Highway Restoration, SR 48 Segment 350 to Segment 401, Monroeville Borough324,000

(Base Project Allocation - $324,000)

(9) SR 48, Widening SR 48 in Monroeville and North Versailles to Four Lanes from SR 130 to SR 3015,000,000

(Base Project Allocation - $15,000,000)

(10) SR 50, Highway Restoration, SR 50 Segment 140 to Segment 212, Collier and Scott Townships, Carnegie and Heidelberg Boroughs510,000

(Base Project Allocation - $510,000)

(11) SR 60, Highway Restoration, SR 60 Segment 240 to Segment 283 Parkway West, Moon, North Fayette and Robinson Townships470,000

(Base Project Allocation - $460,000)

(Design and Contingencies - $10,000)

(12) SR 60, Capacity Improvements in Moon Township14,000,000

(Base Project Allocation - $10,000,000)

(Design and Contingencies - $4,000,000)

(13) SR 286, Construction Phase Funding30,000,000

(Base Project Allocation - $30,000,000)

(14) SR 837, Highway Restoration, SR 837 Segment 170 to Segment 210, City of Clairton, West Mifflin and Dravosburg Boroughs368,000

(Base Project Allocation - $368,000)

(15) SR 910, Highway Restoration, SR 910 Segment 390 to Segment 444, Harmar and Indiana Townships370,000

(Base Project Allocation - $370,000)

(16) SR 910 and SR 8, Widening, Realigning and Adding Turn Lanes to Intersection1,950,000

(Base Project Allocation - $1,950,000)

(17) SR 910 at SR 4031, Widening and Aligning Intersection, Adding Left Turn Lanes, Installing Traffic Signal2,240,000

(Base Project Allocation - $1,194,000)

(Land Allocation - $917,000)

(Design and Contingencies - $129,000)

(18) SR 910 at SR 4063, Widening and Aligning Intersection, Adding Left Turn Lanes, Installing Traffic Signal3,369,000

(Base Project Allocation - $1,812,000)

(Land Allocation - $1,391,000)

(Design and Contingencies - $166,000)

(19) SR 910 at SR 4052, Widening SR 910 to Provide Eastbound and Westbound Left Turn Lanes, Widening SR 4052 to Provide Northbound and Southbound Left Turn Lanes2,043,000

(Base Project Allocation - $1,517,000)

(Land Allocation - $158,000)

(Design and Contingencies - $368,000)

(20) SR 910 at Cole Road, Installation of Traffic Signal at Intersection126,000

(Base Project Allocation - $112,108)

(Design and Contingencies - $13,892)

(21) SR 2028, Highway Restoration, SR 2028 Segment 80 to Segment 90, City of Clairton, St. Claire Avenue80,000

(Base Project Allocation - $80,000)

(22) SR 2037, Highway Restoration, 2037/Pt. Perry-Electric Tri-Boro Expressway, North Versailles Township and East Pittsburgh Borough1,099,000

(Base Project Allocation - $1,089,000)

(Design and Contingencies - $10,000)

(23) SR 3048, Prestley Street Connector Project, Connecting West Main Street to Lane Road, Collier Township2,001,000

(Base Project Allocation - $1,477,000)

(Land Allocation - $80,000)

(Design and Contingencies - $444,000)

(24) SR 3160, Highway Restoration, SR 3160 Segment 10 to Segment 61, Moon Township636,000

(Base Project Allocation - $636,000)

(25) SR 4003, Highway Restoration, SR 4003 Segment 10 and Segment 11, McKnight Road, City of Pittsburgh304,000

(Base Project Allocation - $304,000)

(26) SR 4011 at SR 49, Make Intersection Into Four-Way Stop, Add Traffic Signal and Lower Intersection by Six Feet1,100,000

(Base Project Allocation - $930,000)

(Land Allocation - $60,000)

(Design and Contingencies - $110,000)

(27) SR 4054 at SR 19, Widen SR 4054 Approach to Provide Left/Left-Through Right Turn Lanes at SR 19517,000

(Base Project Allocation - $446,000)

(Design and Contingencies - $71,000)

(28) SR 4068 and SR 4031, Reconstruct Intersection, Realign Roadway, Improve Drainage and Install Traffic Signal459,000

(Base Project Allocation - $313,000)

(Land Allocation - $115,000)

(Design and Contingencies - $31,000)

(29) Northern Pike, Widen Northern Pike in Monroeville to Four Lanes from Pitcairn Road to SR 482,000,000

(Base Project Allocation - $2,000,000)

(30) North Shore Transportation Connection, Road Improvements, HOV Modification, City of Pittsburgh375,000

(Base Project Allocation - $375,000)

(31) I-79, Road Construction, I-79 to Mon-Fayette Section of Southern Beltway, City of Pittsburgh300,000

(Base Project Allocation - $300,000)

(32) US 22, Road Construction, US 22 to I-79 Section of Southern Beltway, City of Pittsburgh75,000

(Base Project Allocation - $75,000)

(33) US 22, Road Construction, US 22 to I-79 Section of Southern Beltway, City of Pittsburgh300,000

(Base Project Allocation - $300,000)

(34) SR 19, Highway Restoration, from Washington County Line to McLauglin Road, 0010/0000-0060/0000479,000

(Base Project Allocation - $479,000)

(35) SR 48, Highway Restoration, from SR 148 to SR 2031, 0170/0000-0220/0000888,000

(Base Project Allocation - $888,000)

(36) SR 60, Interstate Maintenance, ITS Expansion SR 60, Robinson Town Center to Business 60345,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $45,000)

(37) SR 60, Interstate Maintenance, Parkway West to I-79, 0150/0000-0240/00001,100,000

(Base Project Allocation - $1,100,000)

(38) SR 60, Interstate Maintenance, SR 60 Part 6 and 7 Interstate, Various Townships3,300,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $300,000)

(39) SR 60, Interstate Maintenance, SR 60 Part 2, CPR, Moon Township2,200,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $200,000)

(40) SR 60, Interstate Maintenance, Part 1 Interstate, Moon, North Fayette and Robinson Townships500,000

(Design and Contingencies - $500,000)

(41) SR 60, Roadway, Safety and Access Improvements, Improve McClaren Road Interchange and Other Associated SRs, Findlay Township5,000,000

(Base Project Allocation - $5,000,000)

(42) I-79, Interstate Painting I-79800,000

(Base Project Allocation - $800,000)

(43) SR 28, Road Resurfacing with Bridge Preservation A45, SR 2893,000

(Base Project Allocation - $81,000)

(Design and Contingencies - $12,000)

(44) SR 28, Road Resurfacing with Bridge Preservation, SR 28220,000

(Base Project Allocation - $192,000)

(Design and Contingencies - $28,000)

(45) SR 51, Highway Restoration, SR 51 Signal Enhancement, Edgebrook to Englert102,000

(Base Project Allocation - $100,000)

(Design and Contingencies - $2,000)

(46) SR 51, Highway Restoration, SR 51 North Signal Enhancements, Coraopolis142,000

(Base Project Allocation - $140,000)

(Design and Contingencies - $2,000)

(47) SR 51, Highway Restoration, West End Bridge to McKees Rocks, 0460/0000-0490/00001,000,000

(Base Project Allocation - $1,000,000)

(48) SR 65, Interstate Preservation and Restoration 07-08, SR 65 at NI Ramps, Various Townships617,000

(Base Project Allocation - $536,000)

(Design and Contingencies - $81,000)

(49) SR 65, Interstate Restoration and Preservation 07-08, SR 65 at NI Ramps, Various Townships617,000

(Base Project Allocation - $536,000)

(Design and Contingencies - $81,000)

(50) SR 79, Bridge and Highway Restoration, Interstate 07-08, Neville Top, Aleppo and Robinson Townships, Glenfield Borough800,000

(Base Project Allocation - $800,000)

(51) SR 79, Preventive Maintenance and Bridge Replacement, I-79/Neville/Killbuck-I-279, Various Townships5,500,000

(Base Project Allocation - $5,500,000)

(52) SR 79, Interstate Maintenance, I-79/35M Preparatory Work, Various Townships1,060,000

(Base Project Allocation - $1,060,000)

(53) SR 79, Bridge Preservation - 7, Interstate Preservation 2007-2008, Aleppo Township, Glenfield Borough800,000

(Base Project Allocation - $800,000)

(54) SR 79, Interstate Maintenance, ITS Expansion I-79, I-297 to I-76118,000

(Design and Contingencies - $118,000)

(55) SR 79, Interstate Maintenance, Mill and Overlay, I-79 Part 4 Interstate, Kennedy and Robinson Townships1,250,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $50,000)

(56) SR 79, Interstate Maintenance, Mill and Overlay, I-79 Part 4 Interstate, Kennedy and Robinson Townships1,250,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $50,000)

(57) SR 130, Highway Restoration, Allegheny River Boulevard Signal Enhancement, Penn Hills Township102,000

(Base Project Allocation - $100,000)

(Design and Contingencies - $2,000)

(58) SR 279, Interstate Maintenance CPR, I-279 Part 5, 6 and 7 CPR, Pittsburgh, Various Townships4,400,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $400,000)

(59) SR 279, Interstate Maintenance CPR, I-279 Part 5, 6 and 7 CPR, Various Townships4,400,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $400,000)

(60) SR 279, Interstate Maintenance, ITS Expansion I-279, Camp Horne to I-7996,000

(Design and Contingencies - $96,000)

(61) SR 279, Interstate Maintenance, ETS Expansion I-279/PA 65, North Shore Expressway483,000

(Base Project Allocation - $420,000)

(Design and Contingencies - $63,000)

(62) SR 279, Interstate Maintenance, Fort Duquesne Bridge and Ramps, City of Pittsburgh982,000

(Base Project Allocation - $854,000)

(Design and Contingencies - $128,000)

(63) SR 366, Highway Restoration, from Bull Creek Road to the Tarentum Bridge, 0012/0000-0032/0400, Tarentum Borough234,000

(Base Project Allocation - $234,000)

(64) SR 376, Rehabilitation Includes Concrete Wall and Ceiling Repairs, Facade Repairs, Fan and Fanhouse Repair, Replacement of Lighting and Electrical Systems, City of Pittsburgh4,400,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $400,000)

(65) SR 376, Bridge Preservation and Highway Restoration and Signing Interstates 07-08, City of Pittsburgh4,066,000

(Base Project Allocation - $3,256,000)

(Design and Contingencies - $810,000)

(66) SR 376, Bridge Preservation and Highway Restoration, 07-08, City of Pittsburgh3,222,000

(Base Project Allocation - $2,844,000)

(Design and Contingencies - $378,000)

(67) SR 376, Interstate Maintenance, Mill and Overlay, I-376, Part 4 and 5, Churchill and Monroeville Boroughs, Penn Hills and Wilkins Townships5,500,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $500,000)

(68) SR 376, Interstate Maintenance, I-376 Parkway Electrical, City of Pittsburgh, Various Boroughs900,000

(Base Project Allocation - $800,000)

(Design and Contingencies - $100,000)

(69) SR 376, Interstate Maintenance, I-376 Parkway Walls, Various Townships500,000

(Design and Contingencies - $500,000)

(70) SR 376, Interstate Maintenance, Electrical, I-376 Parkway, Various Townships900,000

(Base Project Allocation - $800,000)

(Design and Contingencies - $100,000)

(71) SR 376, Interstate Maintenance, Mill and Overlay, I-376, Part 4 and 5, Various Townships5,500,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $500,000)

(72) SR 376, Highway Restoration, Squirrel Hill Tunnel Rehabilitation, City of Pittsburgh4,400,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $400,000)

(73) SR 376, Bridge and Highway Restoration, 07-08, I-376-2 Phase 2 Interstate and Phase I Signing, City of Pittsburgh7,238,000

(Base Project Allocation - $6,437,000)

(Design and Contingencies - $801,000)

(74) SR 376, Bridge and Highway Restoration, 07-08, I-376-3 Phase 3, Interstate, Various Townships3,229,000

(Base Project Allocation - $2,851,000)

(Design and Contingencies - $378,000)

(75) SR 376, Interstate Maintenance, Parkway Walls, I-376, City of Pittsburgh, Various Municipalities500,000

(Design and Contingencies - $500,000)

(76) SR 376, Interstate Maintenance, ITS Expansion I-376, Penn Hills to I-76660,000

(Base Project Allocation - $660,000)

(77) SR 376, Highway Restoration, Beechwood Boulevard Ramp to I-376 East, Squirrel Hill, City of Pittsburgh52,000

(Base Project Allocation - $40,000)

(Design and Contingencies - $12,000)

(78) SR 400, Highway Restoration, from Penn Circle to Near Entrance to Shopping Center, 0090/0080-0090/1225315,000

(Base Project Allocation - $315,000)

(79) SR 400, Highway Restoration, from Concrete Section to SR 8, 0090/1225-0120/0000165,000

(Base Project Allocation - $165,000)

(80) SR 579, Interstate Maintenance, Roadway Bridge Patch and Overlay, I-579 Part 1, Veteran's Bridge/Town, City of Pittsburgh4,310,000

(Base Project Allocation - $4,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $290,000)

(81) SR 579, Interstate Maintenance, Roadway Bridge Patch and Overlay, I-579 Part 1, Veteran's Bridge/Town, City of Pittsburgh4,310,000

(Base Project Allocation - $4,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $290,000)

(82) SR 885, Highway Restoration, from SR 885 to Ravensburg Road, 0010/0000-0030/0000168,000

(Base Project Allocation - $168,000)

(83) SR 2048, Highway Restoration, from Bridge over Thompson Run to SR 48, 0050/1252-0110/0000735,000

(Base Project Allocation - $735,000)

(84) SR 3069, Highway Restoration, SR 3069 Improvement200,000

(Base Project Allocation - $200,000)

(85) SR 6279, Bridge and Highway Restoration, Interstates 07-08, City of Pittsburgh1,337,000

(Base Project Allocation - $1,160,000)

(Design and Contingencies - $177,000)

(86) SR 6279, Bridge and Highway Restoration, Interstates 07-08, HOV Section, Patch and Grind, City of Pittsburgh1,359,000

(Base Project Allocation - $1,182,000)

(Design and Contingencies - $177,000)

(87) Various, Highway Restoration and Full Bridge Painting, Allegheny River Crossing, 40th Street Bridge, City of Pittsburgh4,460,000

(Base Project Allocation - $4,000,000)

(Land Allocation - $60,000)

(Design and Contingencies - $400,000)

(88) Various, Bridge and Highway Restoration, Interstates 07-08, Bridge Preventative Maintenance/46 Dam Replacement, Various Townships452,000

(Base Project Allocation - $420,000)

(Design and Contingencies - $32,000)

(89) Various, Bridge Preventative Maintenance/46 Dam Replacement242,000

(Base Project Allocation - $210,000)

(Design and Contingencies - $32,000)

(90) SR 28, Bridge Preservation, O'Hara, Springdale, Frazier and East Deer Townships895,000

(Base Project Allocation - $895,000)

(91) I-79, Interstate Maintenance I-79 at SR 51, Robinson Township200,000

(Base Project Allocation - $200,000)

(92) I-579, Interstate Restoration from the Boulevard of the Allies to Veterans Bridge960,000

(Base Project Allocation - $960,000)

(93) I-376, Pennsylvania Turnpike at Monroeville and along I-376, I-279, Redesignation Signage, SR 22 and SR 60 End at Beaver County Line4,420,000

(Base Project Allocation - $2,820,000)

(Land Allocation - $1,600,000)

Section 303. Armstrong County.

Projects are as follows:

(1) SR 28/66, Highway Reconstruction, Goheenville Dip, Boggs and Wayne Townships1,000,000

(Base Project Allocation - $600,000)

(Land Allocation - $300,000)

(Design and Contingencies - $100,000)

(2) SR 28, Kittanning to Jefferson County Line, Roadway, Bridge, Interchange Improvements and Interchange Construction35,050,000

(Base Project Allocation - $26,250,000)

(Land Allocation - $2,100,000)

(Design and Contingencies - $6,700,000)

(3) SR 28/128, Park and Ride Construction, Slatelick Park-n-Ride, Bell and Henderson Townships110,000

(Base Project Allocation - $80,000)

(Land Allocation - $20,000)

(Design and Contingencies - $10,000)

(4) SR 28, Highway Reconstruction, PA 28 Avenue Gap PM1,400,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $200,000)

(Design and Contingencies - $200,000)

(5) SR 268, Park and Ride Expansion, PA 268 West Kittanning Park-n-Ride, West Kittanning Borough86,000

(Base Project Allocation - $60,000)

(Land Allocation - $20,000)

(Design and Contingencies - $6,000)

(6) SR 268, Intersection Safety Improvements, PA 268 and SR 1038 Intersection, West Kittanning Borough242,000

(Base Project Allocation - $200,000)

(Land Allocation - $7,000)

(Design and Contingencies - $35,000)

(7) SR 356, Highway Reconstruction, Freeport Bridge Ramps, Freeport Borough1,220,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $80,000)

(Design and Contingencies - $140,000)

(8) SR 1003, Slide Repair, South Mahoning Slide, Pine Township260,000

(Base Project Allocation - $260,000)

(9) Rail Siding, Rail Siding Construction, Freeport Terminals, Freeport Borough1,054,000

(Base Project Allocation - $906,000)

(Land Allocation - $64,000)

(Design and Contingencies - $84,000)

Section 304. Beaver County.

Projects are as follows:

(1) SR 18, Highway Restoration, SR 18, Wallace Run Road, SR 351, Big Beaver Boulevard, Homewood and Koppel500,000

(Base Project Allocation - $500,000)

(2) SR 51, Highway Reconstruction, SR 51, Franklin Avenue Bridge/Ambridge Aliquippa 2, City of Aliquippa and Hopewell Township1,810,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $10,000)

(3) SR 151, Highway Restoration, SR 151, Brodhead Road Route 51, Hopewell Township, South Heights Borough400,000

(Base Project Allocation - $400,000)

(4) SR 151, Highway Restoration, SR 151 Segment 10 to Segment 50, Greene, Independence, Hanover and Raccoon Townships700,000

(Base Project Allocation - $700,000)

(5) SR 288, Highway Restoration, SR 288 Segment 100 to Segment 120, Franklin Township310,000

(Base Project Allocation - $310,000)

(6) SR 288, Highway Restoration, SR 288 Segment 130 to Segment 150, Franklin Township310,000

(Base Project Allocation - $310,000)

(7) SR 588, Highway Restoration, SR 588, Eastvale Borough, Mercer Bennett Run, North Sewickley Township320,000

(Base Project Allocation - $320,000)

(8) SR 3017, Highway Restoration, SR 3017/SR 60, Brodhead Road, Center Township830,000

(Base Project Allocation - $800,000)

(Design and Contingencies - $30,000)

(9) SR 4028, Highway Restoration, SR 4028/SR 68, Third Street, Beaver Borough and Vanport Township315,000

(Base Project Allocation - $310,000)

(Design and Contingencies - $5,000)

(10) SR 4035, Highway Restoration, SR 4035 Segment 20 to Segment 50, Brighton Township310,000

(Base Project Allocation - $310,000)

(11) SR 4051, Highway Restoration, SR 4051, Buffalo - Gypsy Glen, Beaver Borough320,000

(Base Project Allocation - $310,000)

(Design and Contingencies - $10,000)

(12) SR 18, Highway Restoration, Squirrel Run Road to Route 60, 0300/0000-0390/0000800,000

(Base Project Allocation - $800,000)

(13) SR 51, Interstate Maintenance, SR 51 and Franklin AmAliquippa2, North Shore Expressway1,800,000

(Base Project Allocation - $1,800,000)

(14) SR 989, Highway Restoration, 0010 to 0060272,000

(Base Project Allocation - $272,000)

(15) SR 989, Highway Restoration, from SR 65 to Solar Drive, 0010/0000-0060/0000270,000

(Base Project Allocation - $270,000)

(16) SR-60, Signage for Redesignation from Allegheny County to Lawer5,210,000

(Base Project Allocation - $4,510,000)

(Land Allocation - $700,000)

Section 305. Bedford County.

Projects are as follows:

(1) SR 4009, Safety Improvement, Sunnyside Road Signal Improvement, Bedford Borough155,000

(Base Project Allocation - $125,000)

(Land Allocation - $2,000)

(Design and Contingencies - $28,000)

(2) SR 4009, Safety Improvement, Sunnyside Road Signal Improvement, Bedford Borough155,000

(Base Project Allocation - $125,000)

(Land Allocation - $2,000)

(Design and Contingencies - $28,000)

Section 306. Berks County.

Projects are as follows:

(1) SR 10, Widening, New Morgan Borough and Caernarvon Township12,500,000

(Base Project Allocation - $10,000,000)

(Design and Contingencies - $2,500,000)

(2) SR 73, Radius Flattening/Safety, SR 73/1010, Maiden Creek Township300,000

(Base Project Allocation - $70,000)

(Land Allocation - $200,000)

(Design and Contingencies - $30,000)

(3) SR 78, I-78 Restoration, Strausstown to SR 611,225,000

(Base Project Allocation - $1,125,000)

(Design and Contingencies - $100,000)

(4) SR 183, Intersection Improvement, SR 183/4016 Jefferson Township2,100,000

(Base Project Allocation - $1,400,000)

(Land Allocation - $200,000)

(Design and Contingencies - $500,000)

(5) SR 183, Intersection Improvements, Signalization at SR 4016, New Schaefferstown Road10,500,000

(Base Project Allocation - $7,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $2,500,000)

(6) SR 183, PA 183 Widening, Bern Township, US 222 to Airport400,000

(Base Project Allocation - $400,000)

(7) SR 183, Highway Widening Between SR 222 and SR 3051, Upper Van Reed Road3,500,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $500,000)

(8) SR 183, Intersection Improvements at SR 40181,000,000

(Base Project Allocation - $700,000)

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(9) SR 222, US 222 North Corridor EIS, Ontelaunee Township to Kutztown9,000,000

(Design and Contingencies - $9,000,000)

(10) SR 422, West Shore Bypass, Highway Rehabilitation3,150,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $400,000)

(Design and Contingencies - $750,000)

(11) SR 724, Guiderail/Safety Improvements, Berks Guiderail Upgrade, Various Municipalities110,000

(Base Project Allocation - $100,000)

(Design and Contingencies - $10,000)

(12) SR 2005, Congestion Reduction, Route 222 Business CCIP, City of Reading and Muhlenberg Township525,000

(Base Project Allocation - $400,000)

(Design and Contingencies - $125,000)

(13) SR 2005, Intersection Improvements, Signalization at SR 1010, Park Road, and Relocation of SR 222 Ramp2,000,000

(Base Project Allocation - $1,600,000)

(Land Allocation - $100,000)

(Design and Contingencies - $300,000)

(14) I-76, Improvements in New Morgan Borough25,000,000

(Base Project Allocation - $21,250,000)

(Design and Contingencies - $3,750,000)

(15) SR 78, Berks Bridge Under Clearance, Bethel, Upper Bern, Upper Tulpehocken Townships100,000

(Design and Contingencies - $100,000)

(16) SR 222, Safety Improvements and Congestion Reduction, 222 North Corridor, City of Reading5,950,000

(Base Project Allocation - $4,000,000)

(Land Allocation - $250,000)

(Design and Contingencies - $1,700,000)

(17) SR 222, Corridor Safety Improvements and Traffic Calming, Muhlenberg Township 222, Muhlenberg Township250,000

(Base Project Allocation - $250,000)

(18) SR 422, Signal Coordination and Congestion Reduction, 422 Corridor Phase 3, Exeter Township150,000

(Base Project Allocation - $150,000)

(19) Rail Crossing Signalization Upgrade, Hill Road Railroad Crossing, Blandon Township18,000

(Base Project Allocation - $18,000)

(20) Rail Crossing Signalization Upgrade, Main Street Railroad Crossing, Lyons Borough18,000

(Base Project Allocation - $18,000)

(21) Rail Crossing Signalization Upgrade, East Wesner Railroad Upgrade, Maidencreek Township18,000

(Base Project Allocation - $18,000)

(22) Replace At-Grade Railroad Crossing with a Bridge, Krick Lane Bridge, South Heidelberg Township168,000

(Base Project Allocation - $60,000)

(Land Allocation - $18,000)

(Design and Contingencies - $90,000)

(23) Improved Connection to SR 183, River Road Extension, City of Reading500,000

(Base Project Allocation - $500,000)

(24) Rail Crossing Signalization Upgrade, Willow Street Railroad Upgrade, Fleetwood Borough65,000

(Base Project Allocation - $65,000)

(25) SR 422, Preventative Maintenance and Pavement Restoration, West Shore Bypass Highway, Cumru Township, City of Reading and West Reading Borough2,920,000

(Base Project Allocation - $1,560,000)

(Land Allocation - $160,000)

(Design and Contingencies - $1,200,000)

(26) Intersection of Oley Turnpike Road and Ritters Road, Exeter Township, Realignment, Improvement and Signalization4,500,000

(Base Project Allocation - $4,500,000)

(27) SR 562, Intersection with Ritters Road, Exeter Township, Road Improvement and Signalization4,500,000

(Base Project Allocation - $4,500,000)

Section 307. Blair County.

Projects are as follows:

(1) SR 99, Concrete Rehabilitation, Greenfield Township100,000

(Base Project Allocation - $100,000)

(2) SR 99, Gabion Wall Repair, I-99, Allegheny Township50,000

(Base Project Allocation - $50,000)

Section 308. Bradford County.

Projects are as follows:

(1) SR 220, Sayre-Athens Bypass Betterment Project6,100,000

(Base Project Allocation - $6,100,000)

Section 309. Bucks County.

Projects are as follows:

(1) SR 263, Widening, Channelization, Signalization and Lighting, PA 263, County Line to Bristol, Warminster Township670,000

(Base Project Allocation - $670,000)

(2) SR 3003, Widening, Safety Improvements and Signalization along SR 3003, Lower State Road and Wells Road600,000

(Base Project Allocation - $510,000)

(Land Allocation - $60,000)

(Design and Contingencies - $30,000)

(3) US 13, Reconstruction, Redevelopment and Beautification, US 13 Corridor1,250,000

(Base Project Allocation - $1,250,000)

(4) US 202, Section 700, Parkway Project, County Line/Parkway Overpass and Interchange20,000,000

(Base Project Allocation - $18,000,000)

(Design and Contingencies - $2,000,000)

(5) US 202, Section 700 Parkway Project, Limekiln Pike/Parkway Overpass and Interchange20,000,000

(Base Project Allocation - $18,000,000)

(Design and Contingencies - $2,000,000)

(6) Protzner Road, Design and Construction, Protzner Road Connector800,000

(Base Project Allocation - $800,000)

(7) Swamp Road, Safety and Roadway Improvements, Swamp Road Corridor600,000

(Base Project Allocation - $600,000)

Section 310. Butler County.

Projects are as follows:

(1) SR 528, Park and Ride Expansion, Jackson Township110,000

(Base Project Allocation - $84,000)

(Land Allocation - $20,000)

(Design and Contingencies - $6,000)

(2) SR 3018, Highway Construction, Rowan Road, Cranberry Township920,000

(Base Project Allocation - $800,000)

(Land Allocation - $80,000)

(Design and Contingencies - $40,000)

(3) SR 3021, Highway Restoration, Franklin Road, Cranberry Township720,000

(Base Project Allocation - $600,000)

(Land Allocation - $80,000)

(Design and Contingencies - $40,000)

(4) SR 3022, Highway Reconstruction, Rochester Road, Cranberry Township885,000

(Base Project Allocation - $650,000)

(Land Allocation - $200,000)

(Design and Contingencies - $35,000)

(5) SR 3022, Highway Construction, Rochester Road, Cranberry Township885,000

(Base Project Allocation - $650,000)

(Land Allocation - $200,000)

(Design and Contingencies - $35,000)

(6) US 19, Northwest Connector Project, Complete the Connection from Powell Road that Begins at Freedom Road to Freshcorn Road to SR 192,800,000

(Base Project Allocation - $2,380,000)

(Design and Contingencies - $420,000)

(7) SR 19, Traffic Study, US 19, Corridor Study1,670,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $400,000)

(Design and Contingencies - $270,000)

(8) SR 28/356, Park and Ride Expansion, PA 28/356, Buffalo Township86,000

(Base Project Allocation - $60,000)

(Land Allocation - $20,000)

(Design and Contingencies - $6,000)

(9) SR 68, Safety Improvement, O'Donnel Curve490,000

(Base Project Allocation - $400,000)

(Land Allocation - $30,000)

(Design and Contingencies - $60,000)

(10) I-79/US 422, Park and Ride Construction, I-79/US 422 Park-n-Ride, Muddycreek Township66,000

(Base Project Allocation - $40,000)

(Land Allocation - $20,000)

(Design and Contingencies - $6,000)

(11) Traffic Study, Butler City Traffic Study Results, Butler City1,670,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $400,000)

(Design and Contingencies - $270,000)

(12) SR 528, Park and Ride Expansion, Jackson Township96,000

(Base Project Allocation - $70,000)

(Land Allocation - $20,000)

(Design and Contingencies - $6,000)

Section 311. Cambria County.

Projects are as follows:

(1) SR 271, Safety Improvement, Flatten Curve, Phoebe Court Curves, City of Johnstown155,000

(Base Project Allocation - $125,000)

(Land Allocation - $2,000)

(Design and Contingencies - $28,000)

(2) SR 22 from SR 22 and 219 Interchange, Ebensburg, to SR 4031 (West High Street) and SR 22 Interchange, Cambria Township168,000

(Base Project Allocation - $140,000)

(Design and Contingencies - $28,000)

(3) SR 22 Intersection with SR 3032 (Minimal Road), Cambria Township, Additional Turn Lanes and Increased Length of Existing Turn Lanes2,850,000

(Base Project Allocation - $1,750,000)

(Land Allocation - $100,000)

(Design and Contingencies - $1,000,000)

(4) Intersection of SR 22 and PENNDOT Drive and WalMart Plaza, Cambria Township, Additional Turn Lanes2,000,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $100,000)

(Design and Contingencies - $400,000)

(5) SR 22, Cambria Township, from Giant Eagle Plaza to the WalMart Plaza, Construct a New Service Road and Install Barrier5,250,000

(Base Project Allocation - $3,250,000)

(Land Allocation - $500,000)

(Design and Contingencies - $1,500,000)

(6) Jamesway Road Two-way Access near the WalMart Plaza, Cambria Township, Intersection Realignment3,150,000

(Base Project Allocation - $1,650,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $500,000)

Section 312. Cameron County.

Projects are as follows:

(1) SR 120, Safety Improvement, Additional Turn Lane, Emporium Borough700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

Section 313. Carbon County.

Projects are as follows:

(1) SR 80, I-80 White Haven Bridge Repair, East Side Borough, Kidder Township850,000

(Base Project Allocation - $770,000)

(Design and Contingencies - $80,000)

Section 314. Centre County.

Projects are as follows:

(1) SR 99, ITS Installation, I-99, Port Matilda to I-802,600,000

(Base Project Allocation - $2,600,000)

(2) SR 26, Restoration and Rehabilitation, Pleasant Gap Borough525,000

(Base Project Allocation - $400,000)

(Land Allocation - $50,000)

(Design and Contingencies - $75,000)

(3) SR 26, Restoration and Rehabilitation, Beaver Avenue Betterment, State College Borough and College Townships400,000

(Base Project Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $50,000)

(4) SR 26, Safety Improvement, SR 26 and SR 3011 Sign Installation, College Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(5) SR 26, Safety Improvement, Additional Turn Lane, Ferguson Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(6) SR 45, Safety Improvement, SR 45 and SR 3014 Intersection, Harris Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(7) SR 150, Congestion Reduction, US 150 Corridor, Bellefonte Borough and Spring Township1,050,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $50,000)

(8) SR 322, Rehabilitation and Resurfacing, US 322, Resurfacing, Potter Township590,000

(Base Project Allocation - $440,000)

(Land Allocation - $50,000)

(Design and Contingencies - $100,000)

(9) SR 504, Rehabilitation and Additional Turn Lane, Wingate Turn Lane, Union and Boggs Townships460,000

(Base Project Allocation - $300,000)

(Land Allocation - $100,000)

(Design and Contingencies - $60,000)

(10) SR 3014, Safety Improvement, SR 3014 and SR 3018, Intersection Improvements, State College Borough700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(11) SR 3014, Safety Improvement, Traffic Management, Patton and Ferguson Townships, State College Borough700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(12) Safety Improvement, University Park Area, State College Borough250,000

(Base Project Allocation - $250,000)

Section 315. Chester County.

Projects are as follows:

(1) SR 29, Additional Right and Left Turning Lanes, PA 29 Phase III, East Whiteland and Charlestown Townships2,950,000

(Base Project Allocation - $1,900,000)

(Land Allocation - $400,000)

(Design and Contingencies - $650,000)

(2) SR 202, Roadway and Bridge Reconstruction, US 202, Exton Bypass - Route 29, East Whiteland Township14,200,000

(Base Project Allocation - $14,200,000)

(3) SR 1002, Improve Hazardous and Congested Intersection by Eliminating Offset and Adding Left Turn Lanes, Swedesford at Valley Road, Tredyffrin Township160,000

(Base Project Allocation - $160,000)

(4) SR 1055, Construct Two-Lane or Three-Lane Highway on New Alignment, Eagle Loop Road, South Link, Upper Uwchlan Township1,020,000

(Base Project Allocation - $1,020,000)

(5) SR 2020/SR 3053, Extension of SR 2020, Boot Road, to SR 3053, Viaduct Avenue, Borough of Downingtown4,600,000

(Base Project Allocation - $3,700,000)

(Design and Contingencies - $900,000)

(6) US 30, Reconstruction, Including Travel Lanes and Shoulders, from PA 10 to US 30 Business1,000,000

(Base Project Allocation - $1,000,000)

(7) US 202, Section 100 of US 202, Additional Lane in Each Direction, Construct Grade Separation Interchanges180,000,000

(Base Project Allocation - $180,000,000)

(8) US 202, Paving Corridor from Delaware Border to High Street, West Chester800,000

(Base Project Allocation - $800,000)

(9) PA 100, Provide Four Through Lanes on PA 100 by Constructing Two Through Lanes to the East of Ludwigs Corner1,000,000

(Base Project Allocation - $1,000,000)

(10) French Creek Parkway, Design and Construct the French Creek Parkway and Connector Roads, Phoenixville1,250,000

(Base Project Allocation - $1,250,000)

(11) PA-100, Corridor Improvements, Security Wall along the West Side of Route 100 Spur Between Kirkland Road and Greenhill Road, West Goshen Township2,500,000

(Base Project Allocation - $2,500,000)

(12) SR-52, Roundabout Construction, Route 52650,000

(Base Project Allocation - $650,000)

Section 316. Clarion County.

Projects are as follows:

(1) SR 368, Intersection Improvement, PA 368/T-310 Intersection, Licking Township785,000

(Base Project Allocation - $580,000)

(Land Allocation - $85,000)

(Design and Contingencies - $120,000)

(2) SR 68, Safety Improvement, Reidsburg Bridge Curve, Piney Township490,000

(Base Project Allocation - $400,000)

(Land Allocation - $30,000)

(Design and Contingencies - $60,000)

(3) SR 80, I-80 Mill and Fill Preventative Maintenance, Clarion, Limestone and Monroe Townships814,000

(Base Project Allocation - $814,000)

(4) SR 208/338, Safety Improvement, PA 208 and PA 338 Intersection, Beaver and Knox Townships193,000

(Base Project Allocation - $150,000)

(Land Allocation - $8,000)

(Design and Contingencies - $35,000)

(5) SR 322/66, Safety Improvement, US 322 and PA 66 Intersection, Paint Township198,000

(Base Project Allocation - $150,000)

(Land Allocation - $13,000)

(Design and Contingencies - $35,000)

(6) I-80, Preventive Maintenance, Clarion, I-80 Mill and Fill Preventive Maintenance815,000

(Base Project Allocation - $785,000)

(Design and Contingencies - $30,000)

Section 317. Clearfield County.

Projects are as follows:

(1) SR 80, Runoff Study, I-80, DuBois Area, Sandy Township172,000

(Base Project Allocation - $100,000)

(Land Allocation - $2,000)

(Design and Contingencies - $70,000)

(2) SR 80, I-80 PM Project 4, Interstate Maintenance Program, Lawrence, Pine, Sandy, Union and Washington Townships2,565,000

(Base Project Allocation - $2,315,000)

(Land Allocation - $250,000)

(3) SR 153, Safety Improvement, T-384 Intersection, Woodward Township130,000

(Base Project Allocation - $100,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(4) SR 53, Additional Turn Lane at Ninth Street Intersection, Phillipsburg250,000

(Base Project Allocation - $100,000)

(Design and Contingencies - $150,000)

(5) SR 219, Safety Improvement, SR 3011 Intersection, Irishtown Road, Bloom Township235,000

(Base Project Allocation - $160,000)

(Land Allocation - $10,000)

(Design and Contingencies - $65,000)

(6) SR 219, Additional Lane, Intersection Improvements, Sandy Township900,000

(Base Project Allocation - $900,000)

(7) SR 219, Restoration and Rehabilitation, Luthersburg to Anderson Creek, Brady and Bloom Townships662,000

(Base Project Allocation - $600,000)

(Land Allocation - $2,000)

(Design and Contingencies - $60,000)

(8) SR 219, SAMI, Intersection Improvements, Bell Township672,000

(Base Project Allocation - $600,000)

(Land Allocation - $2,000)

(Design and Contingencies - $70,000)

(9) SR 219, SAMI, Liberty Boulevard, City of DuBois260,000

(Base Project Allocation - $200,000)

(Land Allocation - $40,000)

(Design and Contingencies - $20,000)

(10) SR 219, Restoration and Rehabilitation, Brady Street Turning Lane, City of DuBois552,000

(Base Project Allocation - $250,000)

(Design and Contingencies - $302,000)

(11) SR 219, Safety Improvement, Regional Traffic Study, City of DuBois, Sandy Township340,000

(Base Project Allocation - $200,000)

(Land Allocation - $40,000)

(Design and Contingencies - $100,000)

(12) SR 219, Restoration, Rehabilitation and Bridge Preservation, McGees Mills to Burnside545,000

(Base Project Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $125,000)

(13) SR 219, Highway Restoration, Woodland to Shawville, Betterment, Bradford and Goshen Townships662,000

(Base Project Allocation - $600,000)

(Land Allocation - $2,000)

(Design and Contingencies - $60,000)

(14) SR 219, Restoration and Rehabilitation, DuBois Four Lane (State), Sandy Township1,525,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $25,000)

(15) SR 219, Safety and Signal Improvements, City of DuBois700,000

(Base Project Allocation - $500,000)

(Land Allocation - $150,000)

(Design and Contingencies - $50,000)

(16) SR 219, Safety, Alignment and Signal Improvements, Brady Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $150,000)

(Design and Contingencies - $50,000)

(17) SR 255, Safety Improvement, Tyler Intersection, Huston Township90,000

(Base Project Allocation - $70,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(18) SR 255, Safety Improvement, Road Resurfacing, Huston Township280,000

(Base Project Allocation - $180,000)

(Land Allocation - $20,000)

(Design and Contingencies - $80,000)

(19) SR 322, Restoration and Rehabilitation, Rockton Mountain, Union Township294,000

(Base Project Allocation - $294,000)

(20) SR 322, Safety and Signal Improvement, Lawrence Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(21) SR 453, Restoration and Rehabilitation, Anderson Creek Bridge Betterment, Curwensville Borough174,000

(Base Project Allocation - $120,000)

(Design and Contingencies - $54,000)

(22) SR 970, Restoration and Rehabilitation, Woodland to Shawville, Bradford and Goshen Townships662,000

(Base Project Allocation - $600,000)

(Land Allocation - $2,000)

(Design and Contingencies - $60,000)

(23) SR 4017/SR 255, Safety Improvement, Lane Addition, Sandy Township640,000

(Base Project Allocation - $500,000)

(Land Allocation - $100,000)

(Design and Contingencies - $40,000)

(24) SR 80, Restoration and Rehabilitation, Jefferson County Line to Exit 120, Sandy and Union Townships2,220,000

(Base Project Allocation - $2,140,000)

(Land Allocation - $80,000)

(25) SR 80, Milling, Resurfacing, Guide Rail and Drainage, I-80 PM Project 4, Various Townships2,565,000

(Base Project Allocation - $2,315,000)

(Design and Contingencies - $250,000)

(26) SR 1001, Restoration and Rehabilitation, SR 1001 Old Town Road, Lawrence Township450,000

(Base Project Allocation - $150,000)

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(27) SR 4017, Additional Turn Lane, SR 4017 Right Turn Lane, Sandy Township315,000

(Base Project Allocation - $140,000)

(Land Allocation - $75,000)

(Design and Contingencies - $100,000)

(28) Railroad, Railroad Safety Improvements, Clearfield Cluster Project, Clearfield and Clinton Counties250,000

(Base Project Allocation - $250,000)

(29) SR 53, Restoration and Rehabilitation and Bridge Preservation, McGees Mills to Burnside, Bell and Burnside Townships545,000

(Base Project Allocation - $400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $125,000)

Section 318. Clinton County.

Projects are as follows:

(1) SR 150, Restoration and Rehabilitation, Fishing Creek to Bald Eagle, Bald Eagle Township965,000

(Base Project Allocation - $650,000)

(Land Allocation - $200,000)

(Design and Contingencies - $115,000)

(2) SR 150, Safety Improvement, Intersection Improvements, City of Lock Haven700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(3) SR 220, Safety Improvement, Intersection Improvements, Lamar Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

Section 319. Columbia County.

Projects are as follows:

(1) SR 42 and SR 4009, Intersection Improvements, Intersection of SR 42 and SR 4009, Mount Pleasant Township1,300,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(2) SR 80, Safety Improvement, Low Head Dam Removal, Mount Pleasant and Scott Townships70,000

(Base Project Allocation - $50,000)

(Design and Contingencies - $20,000)

(3) Various, Wetlands Monitoring Analysis, Various Locations100,000

(Base Project Allocation - $100,000)

(4) SR 80, Bridge Deck Patching, Mifflinville Susquehanna Bridge, Mifflin and South Centre Townships1,000,000

(Base Project Allocation - $1,000,000)

(5) SR 80, Highway Reconstruction from Buckhorn to the Montour County Line470,000

(Base Project Allocation - $450,000)

(Design and Contingencies - $20,000)

Section 320. Crawford County.

Projects are as follows:

(1) SR 8, Update Existing Traffic Signals, PA 8/PA 27, Barber to Schwartz, Geale to Second Street, City of Titusville130,000

(Base Project Allocation - $50,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(2) SR 89, Realignment of S Curve, SR 89 Segment 60, Three Miles North of Titusville, Oil Creek Township350,000

(Base Project Allocation - $300,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(3) SR 79, Interstate Restoration, I-79 Milepost 153.3 to Milepost 165, Hayfield and Cussewago Townships1,000,000

(Base Project Allocation - $1,000,000)

(4) SR 79, IPM Interstate Restoration, Milepost 153.5 to Milepost 165, I-79 Segment 1530/1531-1620/1621, Cussewago and Hayfield Townships2,500,000

(Base Project Allocation - $2,500,000)

(5) SR 27, Signal Upgrades, Drainage Improvements, New Roadway, SR 27 and North Street Connector, City of Meadville2,000,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $800,000)

(Design and Contingencies - $200,000)

(6) SR 20, Turning Radii, Surface Improvements, Drainage and Realign, SR 198 Realignments, SR 77, 86 and 198, Blooming Valley Borough and Woodcock Township660,000

(Base Project Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(7) SR 6, Install Signals, Drainage, Surface Improvements and Pavement Markings, SR 6, Saegertown Improvements, Saegertown Borough, Woodcock and Hayfield Townships1,060,000

(Base Project Allocation - $800,000)

(Land Allocation - $160,000)

(Design and Contingencies - $100,000)

Section 321. Cumberland County.

Projects are as follows:

(1) SR 1006, Construction of an Underpass on SR 1006 at Stella Street Rail Crossing8,787,000

(Base Project Allocation - $6,887,000)

(Land Allocation - $550,000)

(Design and Contingencies - $1,350,000)

(2) SR 81, I-81 PM Resurfacing, Carlisle Borough250,000

(Base Project Allocation - $100,000)

(Design and Contingencies - $150,000)

Section 322. Dauphin County.

Projects are as follows:

(1) SR 230, Lower Swatara Township, Improvements to University Drive, Beginning at SR 230 and Terminating at the Airport Connector Road29,000,000

(Base Project Allocation - $23,000,000)

(Design and Contingencies - $6,000,000)

(2) Third Street, Road Extension, Third Street from I-83 to Chestnut Street, City of Harrisburg1,080,000

(Base Project Allocation - $1,080,000)

(3) SR 2029, I-81 Bridge Preventative Maintenance, Lower Paxton, East Hanover and West Hanover Townships852,000

(Base Project Allocation - $852,000)

(4) SR 83, Widen and Interchange Improvement, I-83 East Shore Section 1, Swatara, Lower Paxton and Susquehanna Townships940,000

(Design and Contingencies - $940,000)

(5) SR 83 and 2nd Street, Construction of the Southern Gateway Project, City of Harrisburg20,000,000

(Base Project Allocation - $15,000,000)

(Land Allocation - $2,000,000)

(Design and Contingencies - $3,000,000)

Section 323. Delaware County.

Projects are as follows:

(1) SR 95, Construct New On/Off Ramps from US 322 at Commodore Barry Bridge to PA 291, Second Street, I-95/322, Waterfront Access, Chester City35,000

(Base Project Allocation - $35,000)

(2) SR 322, Conchester Road, US 322, Corridor Improvements to Conchester Road, Widening to Four Lanes, Construction of Jughandles and Installation of Median Barriers117,500,000

(Base Project Allocation - $90,000,000)

(Land Allocation - $14,500,000)

(Design and Contingencies - $13,000,000)

(3) SR 491 at Section M00, Corridor Improvement, Naamans Creek Road8,000,000

(Base Project Allocation - $8,000,000)

(4) SR 2016, Signalization Improvements, Baltimore Avenue/Pike, Media Borough, Nether Providence1,122,000

(Base Project Allocation - $1,122,000)

(5) SR 3029, SR 3031, SR 3007, SR 0261, Intersection Improvements in Bethel Township at Five-Point Intersection of Valley Brook Road (SR 3029), Chelsea Road, (SR 3031), Concord Road (SR 3007) and Foulk Road (SR 0261)700,000

(Design and Contingencies - $700,000)

(6) SR 3023, SR 3029, SR 3046, Llewellyn Road Realignment in Chester Heights Borough1,200,000

(Base Project Allocation - $904,000)

(Land Allocation - $200,000)

(Design and Contingencies - $96,000)

(7) US 1 and SR 452, Middletown Township, Construction of Loop Road and Improvements to US 1 and SR 45212,000,000

(Base Project Allocation - $10,000,000)

(Design and Contingencies - $2,000,000)

(8) I-95 and SR 322, Interchange and Area Improvements, Improvement Movement to Northbound I-95 and Create New Movement for Southbound I-95700,000

(Design and Contingencies - $700,000)

Section 324. Elk County.

Projects are as follows:

(1) SR 219, Intersection Improvements, SR 219 Intersection with SR 2003, Horton Township195,000

(Base Project Allocation - $120,000)

(Land Allocation - $75,000)

(2) SR 321, Restoration and Rehabilitation, Wilcox to Kane, Jones and Wetmore Townships, Kane Borough1,175,000

(Base Project Allocation - $1,100,000)

(Land Allocation - $75,000)

(3) SR 219, Safety Improvement, ITS, Ridgway Borough and Ridgway Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $150,000)

(Design and Contingencies - $50,000)

(4) SR 255, Restoration and Rehabilitation, Million Dollar Highway, City of St. Marys2,640,000

(Base Project Allocation - $2,400,000)

(Land Allocation - $60,000)

(Design and Contingencies - $180,000)

Section 325. Erie County.

Projects are as follows:

(1) SR 5, Highway Restoration, Widening to Add Lane, 12th Street, Peninsula Drive to Asbury Road, City of Erie1,800,000

(Base Project Allocation - $1,600,000)

(Land Allocation - $100,000)

(Design and Contingencies - $100,000)

(2) SR 426, Update Existing Traffic Signals, North Center Street, South Street to Bond Street, City of Corry130,000

(Base Project Allocation - $50,000)

(Land Allocation - $20,000)

(Design and Contingencies - $60,000)

(3) Sassafras Street-Erie County Convention Center, Construction of a New Access Road, Intersection Improvements and Protected Railroad Crossing from the Bayfront Parkway to Presque Isle Bay, New Erie Convention Center on the Sassafras Pier, City of Erie2,500,000

(Base Project Allocation - $2,500,000)

(4) SR 6, Widen Lanes, Shoulders and Construct Turning Lanes, Erie Rural-Urban Corridor, US 6, Various Municipalities840,000

(Base Project Allocation - $750,000)

(Land Allocation - $10,000)

(Design and Contingencies - $80,000)

(5) SR 20, Signal Optimization, Enhancements and Minor Geometric Improvements, SR 20, 26th Street to French Street CCIP, 26th Street and Buffalo Road from Hudson and Geist Street to French Street, City of Erie110,000

(Base Project Allocation - $65,000)

(Land Allocation - $5,000)

(Design and Contingencies - $40,000)

Section 326. Fayette County.

Projects are as follows:

(1) SR 21, Widen SR 21 and SR 166 Intersection to 48 Feet, German Township4,480,000

(Base Project Allocation - $3,360,000)

(Land Allocation - $700,000)

(Design and Contingencies - $420,000)

(2) SR 21, Widen SR 21 and S&T Drive Intersection to 48 Feet, German Township4,520,000

(Base Project Allocation - $3,440,000)

(Land Allocation - $600,000)

(Design and Contingencies - $480,000)

(3) SR 21, Widen S&T Drive to Thompson Crossing to 48 Feet, German, Menallen and South Union Townships3,976,000

(Base Project Allocation - $2,300,000)

(Land Allocation - $1,416,000)

(Design and Contingencies - $260,000)

(4) SR 21, Widen S&T Drive to Thompson Crossing to 48 feet, German, Menallen and South Union Townships4,815,000

(Base Project Allocation - $2,668,000)

(Land Allocation - $1,827,000)

(Design and Contingencies - $320,000)

(5) SR 21, Widen and Upgrade SR 21, Mall Entrance to SR 40, City of Uniontown and South Union Township1,663,000

(Base Project Allocation - $1,046,000)

(Land Allocation - $477,000)

(Design and Contingencies - $140,000)

(6) SR 21, Road Improvements, SR 21400,000

(Base Project Allocation - $400,000)

(7) SR 40, Safety Improvements, SR 40, Menallen and Wharton Townships3,050,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $750,000)

(Design and Contingencies - $300,000)

(8) SR 40, Widen SR 40 and Redesign and Construct SR 40 and SR 119 Interchange, City of Uniontown, South Union and North Union Townships2,400,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $300,000)

(9) SR 40, Safety Improvement, Center Turn Lane, SR 40 from SR 166 to Morgan Street, Redstone Township500,000

(Base Project Allocation - $300,000)

(Land Allocation - $60,000)

(Design and Contingencies - $140,000)

(10) SR 40, Interchange Reconstruction at SR 40, SR 119 and SR 3019, Morgantown Road Interchange, South Union Township2,400,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $100,000)

(Design and Contingencies - $300,000)

(11) SR 119, Intersection Improvement, SR 119 at Technology Drive, North Union Township305,000

(Base Project Allocation - $200,000)

(Land Allocation - $30,000)

(Design and Contingencies - $75,000)

(12) SR 4020, Widening, Realignment, Drainage and Resurfacing, SR 4020-03R, Luzerne Township970,000

(Base Project Allocation - $600,000)

(Land Allocation - $200,000)

(Design and Contingencies - $170,000)

(13) SR 4049, New Road, Companion to Mon-Fayette Expressway, SR 4049 Northgate Highway900,000

(Base Project Allocation - $900,000)

(14) SR 119, Highway Improvements, SR 119, SR 711 to County Line, Bullskin and Upper Tyrone Townships1,270,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $200,000)

(15) SR 40, Highway Improvements, US 40 Upgrades, Wharton Township598,000

(Base Project Allocation - $358,000)

(Land Allocation - $90,000)

(Design and Contingencies - $150,000)

Section 327. Forest County.

Projects are as follows:

(1) SR 666, Widening, Base, Leveling Course, Overlay, Shoulders, Drainage and Guiderail, SR 666, Henry Mill Road, SR 948, Hickory, Howe and Kingsley Townships250,000

(Base Project Allocation - $240,000)

(Design and Contingencies - $10,000)

Section 328. Franklin County.

Projects are as follows:

(1) SR 2007 and SR 2012, Connect SR 2007, Old Forge Road to SR 2012, Country Club Road1,419,000

(Base Project Allocation - $1,419,000)

(2) SR 3002, Realignment, Williamson Road, Antrim Township500,000

(Base Project Allocation - $500,000)

Section 329. Fulton County.

Projects are as follows:

(1) US 522, Interstate Improvements to US 522 from Gem to Needmore, Belfast Township67,000,000

(Base Project Allocation - $67,000,000)

Section 330. Greene County.

Projects are as follows:

(1) SR 79, Resurfacing, Shoulder Milled Rumble Strips and Raised Pavement Markers, I-79, Greene, Perry and Whiteley Townships4,300,000

(Base Project Allocation - $4,300,000)

(2) SR 79, Interstate Improvements, Mile Post 14 to Mile Post 21, Washington and Franklin Townships4,570,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $2,500,000)

(3) SR 2026, Intersection Improvements, SR 2026, Franklin, Jefferson, Greene and Whiteley Townships80,000

(Base Project Allocation - $80,000)

(4) SR 79, I-79 Reconstruction No.1, Perry and Whiteley Townships78,000

(Design and Contingencies - $78,000)

Section 331. Huntingdon County (Reserved).

Section 332. Indiana County.

Projects are as follows:

(1) SR 119, Highway Reconstruction, Wake Robin Curve, Rayne Township1,880,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $400,000)

(Design and Contingencies - $280,000)

(2) (Reserved)
(3) SR 422, Highway Reconstruction, Indiana County3,000,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $600,000)

(Design and Contingencies - $400,000)

(4) (Reserved)
(5) SR 3043, Highway Construction, Rose Street Extension Line Item, Indiana Borough870,000

(Base Project Allocation - $600,000)

(Land Allocation - $170,000)

(Design and Contingencies - $100,000)

(6) SR 4032, Congested Corridor Improvement, Philadelphia Street Congested Corridor, Indiana Borough350,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $50,000)

(7) SR 422, Highway Preservation, US 422 Expressway/6th Street East PM, White Township840,000

(Base Project Allocation - $750,000)

(Design and Contingencies - $90,000)

(8) SR 22, Variable Message Signs, US 22 VMS220,000

(Base Project Allocation - $180,000)

(Design and Contingencies - $40,000)

Section 333. Jefferson County.

Projects are as follows:

(1) SR 28, Roadway, Bridge, Interchange Improvements and Interchange Construction, Armstrong County Line to I-809,190,000

(Base Project Allocation - $6,750,000)

(Land Allocation - $540,000)

(Design and Contingencies - $1,900,000)

(2) SR 119, Realignment and Reconstruction, Punxsy Narrows, Bell and Henderson Townships3,120,000

(Base Project Allocation - $1,800,000)

(Land Allocation - $400,000)

(Design and Contingencies - $920,000)

(3) SR 119, Traffic Study, Punxsutawney Borough50,000

(Design and Contingencies - $50,000)

(4) SR 1010, Highway Construction, Old Clay Plant Road, Brockway Borough650,000

(Base Project Allocation - $400,000)

(Land Allocation - $150,000)

(Design and Contingencies - $100,000)

(5) PA 36/436, Intersection Improvement, PA 36 and 436 Intersection, Punxsutawney Borough and Young Township580,000

(Base Project Allocation - $360,000)

(Land Allocation - $140,000)

(Design and Contingencies - $80,000)

Section 334. Juniata County (Reserved).

Section 335. Lackawanna County.

Projects are as follows:

(1) SR 6, Improve Existing Exit, Robert P. Casey Highway and SR 6006, Carbondale Township640,000

(Base Project Allocation - $320,000)

(Design and Contingencies - $320,000)

(2) SR 11, Intersection Improvement, New Signal, Birney Avenue and Rocky Glen Road, Moosic Borough200,000

(Base Project Allocation - $160,000)

(Design and Contingencies - $40,000)

(3) SR 3011, Intersection Improvements, New Signal, Keyser Avenue and Oak Street, Old Forge Borough200,000

(Base Project Allocation - $160,000)

(Design and Contingencies - $40,000)

(4) SR 3015, Intersection Improvement, New Signal, Main Street and Third Street, Moosic Borough500,000

(Base Project Allocation - $460,000)

(Design and Contingencies - $40,000)

(5) SR 6006, Install Concrete Barrier, US 6 and US 11 and Exit 57, Scranton City, Dickson City Borough1,280,000

(Base Project Allocation - $800,000)

(Land Allocation - $80,000)

(Design and Contingencies - $400,000)

(6) SR 81, Interstate Preventative Maintenance775,000

(Base Project Allocation - $675,000)

(Design and Contingencies - $100,000)

(7) SR 81, Bridge Deck Replacement, I-81 FY 5 Bridge Rehabilitation, Various Municipalities2,000,000

(Base Project Allocation - $2,000,000)

(8) SR 81, Transportation Study, Lackawanna/Luzerne, Interstate Bridge PM, Scott Township300,000

(Base Project Allocation - $200,000)

(Design and Contingencies - $100,000)

(9) SR 81, Transportation Study, Lackawanna/Luzerne, I-2008 PM, City of Scranton and South Abington Township775,000

(Base Project Allocation - $675,000)

(Design and Contingencies - $100,000)

Section 336. Lancaster County.

Projects are as follows:

(1) SR 441, Road Construction, Alternate Truck Route for SR 441, Columbia Borough250,000

(Base Project Allocation - $250,000)

(2) US 30 and SR 4020, Construction of a Single Point Urban Interchange and Related Ramp, Lane and Signalization Improvements at the Intersection of US 30 and SR 4020, Harrisburg Pike, Manheim Township48,580,000

(Base Project Allocation - $18,590,000)

(Design and Contingencies - $29,990,000)

Section 337. Lawrence County.

Projects are as follows:

(1) SR 18, Highway Restoration, SR 18 and SR 108, East Washington, City of New Castle433,000

(Base Project Allocation - $423,000)

(Design and Contingencies - $10,000)

(2) SR 19, Highway Restoration, SR 19, City of Butler and SR 108, Scott and Slippery Rock Townships500,000

(Base Project Allocation - $500,000)

(3) SR 60, Construction of Access Ramps, Millennium Park Access, Neshannock Township800,000

(Base Project Allocation - $200,000)

(Land Allocation - $400,000)

(Design and Contingencies - $200,000)

(4) SR 60, Highway Restoration, Ben Franklin Highway, SR 60 and SR 422, Neshannock and Union Townships810,000

(Base Project Allocation - $800,000)

(Design and Contingencies - $10,000)

(5) SR 208, Highway Restoration, SR 208, Means-Volant at Pearson, Volant Borough, Washington and Wilmington Townships530,000

(Base Project Allocation - $520,000)

(Design and Contingencies - $10,000)

(6) SR 422, Highway Restoration, SR 422, Segment 10 to Segment 60, Pulaski Township630,000

(Base Project Allocation - $ 630,000)

(7) SR 422, Highway Restoration, SR 422, Segment 70 to Segment 120, Mahoning and Pulaski Townships630,000

(Base Project Allocation - $630,000)

(8) PA 60, Construction of Millennium Park Interchange to Provide Access to Lawrence County Industrial Park, Neshannock Township210,000

(Base Project Allocation - $210,000)

(9) SR 60, Interstate Maintenance, I-376-SR 60 Part 8, 9, 10 CPR, Various Townships2,700,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $200,000)

(10) SR 488, Highway Restoration, Tower Road to County Line, 0120/0000 to 0180/28291,360,000

(Base Project Allocation - $1,260,000)

(Design and Contingencies - $100,000)

(11) SR 488, Highway Restoration, SR 65 to Tower Road, 0010/0000-0120/0000721,000

(Base Project Allocation - $721,000)

(12) SR 422, Highway Restoration, SR 551 to SR 4007, Matthews Road, 0120/0000-0160/0000357,000

(Base Project Allocation - $357,000)

(13) SR 79, Bridge Preservation and Highway Reconstruction, I-79 Patch and Overlay Bridge Preservation and Highway Reconstruction, Plain Grove Township2,534,000

(Base Project Allocation - $2,434,000)

(Design and Contingencies - $100,000)

(14) SR 488, Highway Restoration, Morrison Run to County Line, 0090/0000-0180/2829535,000

(Base Project Allocation - $535,000)

(15) SR 422, Highway Restoration, New Castle to Butler County Line, 0410/0000-0550/11762,400,000

(Base Project Allocation - $2,400,000)

(16) SR 60, Signage for Redesignation from Beaver County to Mercer County Line2,810,000

(Base Project Allocation - $2,260,000)

(Land Allocation - $550,000)

Section 338. Lebanon County.

Projects are as follows:

(1) SR 72, I-78 Overhead Bridges, Union, Bethel, Swatara Townships419,000

(Base Project Allocation - $419,000)

(2) SR 4013, I-81 Overhead Bridge Group, East Hanover, Union Townships290,000

(Base Project Allocation - $215,000)

(Land Allocation - $25,000)

(Design and Contingencies - $50,000)

Section 339. Lehigh County.

Projects are as follows:

(1) SR 100, Safety Improvements and Road Betterment at Shimersville Road Intersection200,000

(Base Project Allocation - $200,000)

(2) SR 100, Intersection Upgrade and Signalization, Claussville and Kernsville Roads300,000

(Base Project Allocation - $300,000)

(3) SR 100/SR 309, Intersection Upgrade and Signalization300,000

(Base Project Allocation - $300,000)

(4) SR 100/SR 4003, Intersection Improvement, Installment of New Traffic Signals with Left Turn Lanes onto SR 4003, Including Drainage Improvements, Guiderails, Line Painting, Widening of Road and New Signs, Lowhill Township1,750,000

(Base Project Allocation - $1,750,000)

(5) SR 145, Congestion Reduction, South 4th Street CCIP, City of Allentown540,000

(Base Project Allocation - $400,000)

(Land Allocation - $40,000)

(Design and Contingencies - $100,000)

(6) SR 222/SR 863, Intersection Reconfiguration and Signalization at Intersection of Schantz Road and SR 222 to Allow for Reduction of Accidents and Traffic Congestion4,000,000

(Base Project Allocation - $4,000,000)

(7) SR 309, Install Safety and Warning Devices, Tilghman Street Interchange3,000,000

(Base Project Allocation - $3,000,000)

(8) SR 1019, Select Safety Improvements, Cedar Crest Boulevard1,200,000

(Base Project Allocation - $1,200,000)

(9) SR 309, Highway Safety and Capacity Improvements, Kidspeace Broadway Campus180,000

(Base Project Allocation - $180,000)

(10) SR 222, Right-of-Way Acquisition for Park-n-Ride, 222 Trexlerstown II, Wescoville900,000

(Base Project Allocation - $500,000)

(Land Allocation - $400,000)

(11) US 22, Preconstruction Studies, US 22, Irving Street to Mickley Road, City of Allentown200,000

(Base Project Allocation - $200,000)

(12) Upgrade Circuit for Gates and Lights, 31st Street, 31st Street Railroad Crossing, City of Allentown25,000

(Base Project Allocation - $25,000)

(13) Upgrade Circuit for Gates and Lights, 7th Street Upgrade, 7th Street Railroad Crossing, City of Allentown25,000

(Base Project Allocation - $25,000)

(14) SR 309, Widen Lanes, Add Turn Lane, Upgrade Intersection, SR 309/4010 Intersection, North Whitehall Township300,000

(Base Project Allocation - $300,000)

(15) I-78, Improvements in and around the I-78 and PA 100 Interchange, PA 100 Improvements, Area I-78 Interchange and Schonz Road, City of Allentown3,750,000

(Base Project Allocation - $3,750,000)

(16) SR 1002, 22 and 378, Roadway, Safety and Access Improvements, SR 1002 (Union Boulevard), SR 22 and SR 378 Roadway Improvements, City of Allentown1,750,000

(Base Project Allocation - $1,750,000)

Section 340. Luzerne County.

Projects are as follows:

(1) SR 315, Signal Improvement, Laflin Road to Old Boston Road, Laflin Borough to Jenkins Township1,040,000

(Base Project Allocation - $800,000)

(Land Allocation - $80,000)

(Design and Contingencies - $160,000)

(2) SR 415, Intersection Improvements to Address Congestion, Dallas Borough1,920,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $80,000)

(Design and Contingencies - $640,000)

(3) SR 424, Extension of SR 424, Hazleton Beltway to SR 92411,600,000

(Base Project Allocation - $8,800,000)

(Land Allocation - $800,000)

(Design and Contingencies - $2,000,000)

(4) SR 81, Preventative Maintenance, LLTS Interstate Bridge, Various Townships350,000

(Base Project Allocation - $200,000)

(Design and Contingencies - $150,000)

(5) SR 81, Preventative Maintenance, I-81 Southbound Grinding, Various Townships440,000

(Base Project Allocation - $400,000)

(Design and Contingencies - $40,000)

(6) SR 81, Interstate Preventative Maintenance400,000

(Base Project Allocation - $400,000)

(7) Infrastructure Development of Roadways and Intersection at Oak Street/Route 315/I-81/I-476 Interchange Area, Pittston and Jenkins Townships20,000,000

(Base Project Allocation - $20,000,000)

Section 341. Lycoming County.

Projects are as follows:

(1) Various, Wetlands Monitoring, Various Locations100,000

(Base Project Allocation - $100,000)

(2) SR 118, Add Turn Lane, SR 118 and SR 405 Intersection Improvement, Hughesville Borough160,000

(Base Project Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $40,000)

(3) SR 220, Turn Lanes and Jughandles, Pine and Quenshuneny Run Safety Improvements, Piatt and Woodward Townships95,000

(Base Project Allocation - $65,000)

(Land Allocation - $10,000)

(Design and Contingencies - $20,000)

(4) Wetlands Monitoring Analysis200,000

(Base Project Allocation - $200,000)

Section 342. McKean County.

Projects are as follows:

(1) SR 219, Restoration and Rehabilitation, Lewis Run to Custer City, Lafayette and Sergeant Townships782,000

(Base Project Allocation - $700,000)

(Land Allocation - $2,000)

(Design and Contingencies - $80,000)

(2) SR 6, Safety Improvement, Signal Installation, Smethport Borough700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

Section 343. Mercer County.

Projects are as follows:

(1) Various, Construct and Monitor Wetlands, Countywide Wetland Banking, Various Municipalities in Mercer County130,000

(Base Project Allocation - $60,000)

(Land Allocation - $30,000)

(Design and Contingencies - $40,000)

(2) East Lake Road, Road Relocation, East Lake Road, Pymatuning Township25,000

(Base Project Allocation - $25,000)

(3) SR 58, Signal Timing Optimization, Traffic Signal Enhancements and Minor Geometric Improvements, SR 58, SR 173 and SR 58 CCIP, Grove City Borough120,000

(Base Project Allocation - $75,000)

(Land Allocation - $5,000)

(Design and Contingencies - $40,000)

Section 344. Mifflin County.

Projects are as follows:

(1) SR 22, Restoration and Rehabilitation, Concrete Rehabilitation, Lewistown Borough to Derry Township500,000

(Base Project Allocation - $400,000)

(Design and Contingencies - $100,000)

(2) SR 1017, Intersection Improvements, Radius at Logan Street, Lewistown Borough213,000

(Base Project Allocation - $92,000)

(Land Allocation - $40,000)

(Design and Contingencies - $81,000)

(3) SR 22, Safety Improvement, Intersection Improvements, Lewistown Borough and Derry Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(4) SR 1005, Safety Improvement, Intersection Improvements, Derry Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

Section 345. Monroe County.

Projects are as follows:

(1) SR 447, Widening and other Improvements to PA 447 and Brushy Mountain Road, Stroud Township675,000

(Base Project Allocation - $435,000)

(Land Allocation - $90,000)

(Design and Contingencies - $150,000)

(2) SR 447, Widening and Installation of Southbound Left Turn Lane Approaching Brushy Mountain Road, Northbound Right Turn Lane Approaching Brushy Mountain Road, Northbound Left Turn Lane Approaching the United Steel Driveway, Drainage Improvements, Installation of Traffic Signal and Associated Work675,000

(Base Project Allocation - $575,000)

(Design and Contingencies - $100,000)

(3) SR 611, Highway Reconstruction, Ramp Reconstruction, Bartonsville Interchange HOP, Stroud Township3,000,000

(Base Project Allocation - $3,000,000)

(4) SR 611, Highway Intersection Improvements, 5-Point HOP, Mount Pocono Borough500,000

(Base Project Allocation - $500,000)

(5) SR 80, CCL-115, Including Interchange, Tobyhanna Township300,000

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(6) SR 80, Construction, I-80 Eastbound, 115 to 380 4" Mill and Overlay, Tobyhanna Township773,000

(Base Project Allocation - $703,000)

(Design and Contingencies - $70,000)

(7) SR 80, Bridge Repairs, I-80, Pocono and Smithfield Townships, Stroudsburg Borough290,000

(Base Project Allocation - $250,000)

(Design and Contingencies - $40,000)

(8) SR 80, Bridge Repair, Overlay, I-80 Eastbound, I-380 to SR 33, Jackson and Pocono Townships1,380,000

(Base Project Allocation - $1,080,000)

(Land Allocation - $100,000)

(Design and Contingencies - $200,000)

(9) SR 611, Congested Corridor Improvement Project, 611 CCIP Phase 2, Stroudsburg Borough260,000

(Base Project Allocation - $200,000)

(Land Allocation - $60,000)

(10) I-80, Upgrades and Improvements3,750,000

(Base Project Allocation - $3,750,000)

Section 346. Montgomery County.

Projects are as follows:

(1) SR 202, Reconstruction and Widening, US 202, Morris Road to PA 63, Montgomery, Upper and Lower Gwynedd, Upper Dublin and Whitpain Townships32,700,000

(Base Project Allocation - $32,700,000)

(2) SR 309, Integration, Cheltenham Avenue to PA 63 and the Link from PA 63 to US 202, Cheltenham, Springfield, Upper Dublin and Whitemarsh Townships15,000,000

(Base Project Allocation - $15,000,000)

(3) SR 3051, Widen Replacement Bridge, Old Betzwood Pedestrian Trail, West Norriton Township800,000

(Base Project Allocation - $800,000)

(4) SR 4031, Replacement of Signal Controller Equipment, Installation of Signal Preemption Equipment, Pottstown Borough and North Coventry Township2,000,000

(Base Project Allocation - $2,000,000)

(5) I-476, I-76 and PA 309, Intelligent Transportation System Deployment along I-476 Pennsylvania Turnpike Northeast Extension, PA 309 and I-76 Schuylkill Expressway800,000

(Base Project Allocation - $800,000)

(6) SR 1058, Road Construction, SR 1058 Connector Between PA 309 and Pennsylvania Turnpike Northeast Extension320,000

(Base Project Allocation - $320,000)

(7) Lafayette Street, Street Extension and Interchange Improvements, Lafayette Street Extension2,405,000

(Base Project Allocation - $2,405,000)

Section 347. Montour County.

Projects are as follows:

(1) SR 80, Concrete Reconstruction, Danville Interchange Area, Valley Township230,000

(Base Project Allocation - $230,000)

(2) SR 80, Concrete Reconstruction, Danville Interchange, Valley Township95,000

(Base Project Allocation - $90,000)

(Design and Contingencies - $5,000)

Section 348. Northampton County.

Projects are as follows:

(1) SR 33, Park and Ride Expansion for Intermodal Services and Congestion Reduction, Bethlehem Township200,000

(Base Project Allocation - $125,000)

(Design and Contingencies - $75,000)

(2) SR 78, Installation of Closed Circuit Cameras for ITS CCTV Project Phase 1, Various Municipalities470,000

(Base Project Allocation - $470,000)

(3) SR 248, Expansion of Intersection at SR 248 and Blue Mountain Drive800,000

(Base Project Allocation - $800,000)

(4) SR 78, Preventative Maintenance, I-78, PA 412 to Easton and City of Bethlehem850,000

(Base Project Allocation - $600,000)

(Land Allocation - $100,000)

(Design and Contingencies - $150,000)

(5) SR 22, SR 33, SR 78, Congestion Reduction and Safety Project, Freeway Service Patrol, Various along SR 22, SR 33 and I-78300,000

(Base Project Allocation - $300,000)

(6) SR 33, Interchange Reconstruction, SR 33 and SR 512 Interchange, Wind Gap Borough500,000

(Base Project Allocation - $500,000)

(7) SR 412, Road Reconstruction and Widening, SR 412 Improvement, SR 412 from I-78 into City of Bethlehem3,750,000

(Base Project Allocation - $3,750,000)

Section 349. Northumberland County.

Projects are as follows:

(1) SR 54, Intersection Improvements100,000

(Base Project Allocation - $100,000)

(2) SR 3010, Relocate SR 3010, SR 3010 and SR 225 Intersection Improvement, Jackson Township250,000

(Base Project Allocation - $200,000)

(Land Allocation - $10,000)

(Design and Contingencies - $40,000)

(3) SR 901, Roadway, Safety and Access Improvements, Vicinity of SR 901 and Rinehart Food Distribution Center, Coal Township100,000

(Base Project Allocation - $100,000)

Section 350. Perry County (Reserved).

Section 351. Philadelphia County.

Projects are as follows:

(1) SR 676, Rehabilitation, Reconstruction, Operational Improvements, I-95 and Vine Street Interchange, City of Philadelphia40,000,000

(Base Project Allocation - $40,000,000)

(2) SR 3013, Installation of Gateway Treatment and Landscaping, Planting in Median on Island Avenue, City of Philadelphia375,000

(Base Project Allocation - $375,000)

(3) SR 7301, Removal of Sedgley Avenue Bridge, City of Philadelphia1,000,000

(Base Project Allocation - $1,000,000)

(4) South Philadelphia Access Road, Design and Construction, Port Access Road from South Philadelphia Port and Intermodal Facilities, City of Philadelphia725,000

(Base Project Allocation - $725,000)

(5) Old Delaware Avenue, Incorporate Portion of Old Delaware Avenue as South Philadelphia Port Access Road, City of Philadelphia100,000

(Base Project Allocation - $100,000)

(6) I-95, Roadway, Safety and Access Improvements, Construct Access Roads and Roadway Improvements Associated with New Food Distribution Center and Other Development in the Philadelphia Navy Yard, City of Philadelphia45,000,000

(Base Project Allocation - $40,000,000)

(Design and Contingencies - $5,000,000)

Section 352. Pike County.

Projects are as follows:

(1) SR 84, I-84 Reconstruction, SR 6 to New York Line, Various Municipalities400,000

(Design and Contingencies - $400,000)

(2) SR 84, NEPA SD BDG, I-84 Bridges, Greene and Palmyra Townships725,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $225,000)

Section 353. Potter County.

Projects are as follows:

(1) SR 6, Restoration and Rehabilitation of Coudersport Area, Coudersport Borough and Eulalia Township252,000

(Base Project Allocation - $125,000)

(Land Allocation - $2,000)

(Design and Contingencies - $125,000)

(2) SR 6, Restoration and Rehabilitation, US 6, West of Galeton, Pike and Ulysses Townships1,150,000

(Base Project Allocation - $850,000)

(Land Allocation - $120,000)

(Design and Contingencies - $180,000)

(3) SR 49, Restoration and Rehabilitation, Gold Road, Harrison Township616,000

(Base Project Allocation - $400,000)

(Land Allocation - $106,000)

(Design and Contingencies - $110,000)

(4) SR 6, Safety Improvement, Signing and Delineation, Eulalia Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

(5) SR 44, Safety Improvement, Roadway Resurfacing, Eulalia Township700,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $150,000)

Section 354. Schuylkill County.

Projects are as follows:

(1) SR 54, Realign, Widen, Drainage Improvements and Resurface SR 54 from SR 309 to I-813,000,000

(Base Project Allocation - $3,000,000)

(2) SR 61, Safety Improvements from SR 2014, Brick Hill Road to SR 443, Including the Liberty Street Intersection20,000,000

(Base Project Allocation - $20,000,000)

(3) SR 61, Construction of Split Pair North and South Lanes Deer Lake North Project from SR 895 to SR 201442,000,000

(Base Project Allocation - $42,000,000)

(4) SR 61, Highway Restoration from the Schuylkill River to the Northern Borough Line5,000,000

(Base Project Allocation - $5,000,000)

(5) SR 61, Reconstruction of Intersection at SR 61, SR 2010, Adamsdale Road and Liberty Street3,000,000

(Base Project Allocation - $3,000,000)

(6) SR 61, Installation of Traffic Light and Turning Lanes at the Intersection of SR 61 North and Academy Lane, Butler Township175,000

(Base Project Allocation - $100,000)

(Land Allocation - $25,000)

(Design and Contingencies - $50,000)

(7) SR 309, Safety Improvements at SR 309 and SR 54, Rush Township1,000,000

(Base Project Allocation - $1,000,000)

(8) SR 309, Safety Improvement at Intersection of SR 309 and SR 8952,000,000

(Base Project Allocation - $2,000,000)

(9) SR 309, Safety, Widening and Signalization Improvements, Central Business District from Northern Borough Line to the Southern Borough Line5,000,000

(Base Project Allocation - $5,000,000)

(10) SR 924, Elimination of S Curve, Begin at Schuylkill/Luzerne County Line, Continuation of Project Improvement Plan for SR 924 Adjoining Humboldt Industrial Park, Black Creek Township, Luzerne County, to Green Mountain Road3,000,000

(Base Project Allocation - $3,000,000)

(11) SR 2014, Reconstruction and Drainage Improvements to SR 2014 from SR 443 to SR 611,000,000

(Base Project Allocation - $1,000,000)

(12) SR 4034, Rehabilitation and Resurfacing of SR 4034, Aristes Road, from SR 4036 to Columbia County Line3,000,000

(Base Project Allocation - $3,000,000)

(13) SR 4036, Rehabilitation and Resurfacing of SR 4036, Little Mountain Road, from SR 4033 to Columbia County Line2,000,000

(Base Project Allocation - $2,000,000)

(14) SR 61, Roadway Restoration with Safety Upgrades, SR 61, Port Clinton, Port Clinton Borough and West Brunswick Township1,280,000

(Base Project Allocation - $1,200,000)

(Land Allocation - $40,000)

(Design and Contingencies - $40,000)

(15) SR 81, I-81 Frackville to Mahanoy City, Various Townships1,265,000

(Base Project Allocation - $1,140,000)

(Land Allocation - $20,000)

(Design and Contingencies - $105,000)

(16) SR 81, I-81, SR 25 to SR 901, Mill and Overlay, Frailey and Foster Townships720,000

(Base Project Allocation - $600,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(17) SR 81, I-81 Bridges North of SR 209, Frailey Township2,050,000

(Base Project Allocation - $1,600,000)

(Land Allocation - $50,000)

(Design and Contingencies - $400,000)

(18) SR 54, Resurfacing and Shoulder Work on SR 54 from Rush and Ryan Townships through Mahanoy City to St. Nicholas Bridge in Mahanoy Township Continuing on SR 4030 to Beginning of Girardville Borough2,000,000

(Base Project Allocation - $2,000,000)

(19) SR 61, Safety Improvements, SR 61 in North Manheim and West Brunswick Townships1,000,000

(Base Project Allocation - $1,000,000)

(20) SR 501, Traffic Study, SR 501 and SR 443 in Pine Grove Borough500,000

(Base Project Allocation - $500,000)

(21) SR 81, I-81 Feasibility Study for a Third Lane on I-81 North Between the Ravine and Tremont/Tower City Exits250,000

(Base Project Allocation - $250,000)

(22) SR 309 and US 209, Safety, Widening and signalization Improvements, Central Business District from the Northern Borough Line to the Southern Borough Line5,000,000

(Base Project Allocation - $5,000,000)

Section 355. Snyder County.

Projects are as follows:

(1) SR 11, Mill and Overlay Northbound Lane, Selinsgrove to McKee Half Falls, Chapman, Franklin and Union Townships3,520,000

(Base Project Allocation - $3,500,000)

(Design and Contingencies - $20,000)

(2) SR 11, Mill and Overlay Southbound Lane, Selinsgrove to McKee Half Falls, Chapman, Franklin and Union Townships3,520,000

(Base Project Allocation - $3,500,000)

(Design and Contingencies - $20,000)

Section 356. Somerset County.

Projects are as follows:

(1) SR 601, Streetscape Improvements to Church Street, Pleasant Avenue, Center Street and Race Street3,000,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $1,200,000)

(Design and Contingencies - $300,000)

(2) SR 601, Streetscape Improvements to SR 601 in Vicinity of Somerset Hospital, Borough of Somerset1,500,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $300,000)

Section 357. Sullivan County.

Projects are as follows:

(1) SR 42, Segment 50, Safety Improvements, Davidson and Shrewsbury Townships1,575,000

(Base Project Allocation - $1,300,000)

(Design and Contingencies - $200,000)

(Land Allocations - $75,000)

Section 358. Susquehanna County.

Projects are as follows:

(1) SR 11 and SR 171, Corridor Improvements of SR 11 and SR 171, Great Bend Township3,600,000

(Base Project Allocation - $3,200,000)

(Land Allocation - $80,000)

(Design and Contingencies - $320,000)

(2) SR 81, I-81 Bridge PM, Lenox and Harford Townships290,000

(Base Project Allocation - $270,000)

(Design and Contingencies - $20,000)

(3) SR 81, Preventative Maintenance, Northern Tier 2005 Bridge, Various Townships260,000

(Base Project Allocation - $260,000)

(4) SR 81, Interstate Maintenance, Northern Tier, Lenox and Great Bend Townships350,000

(Base Project Allocation - $200,000)

(Design and Contingencies - $150,000)

(5) SR 81, I-81 Exit 218, Gibson and Harford Townships300,000

(Design and Contingencies - $300,000)

Section 359. Tioga County.

Projects are as follows:

(1) SR 15 and SR 6015, Wetlands Monitoring Analysis, Approximately 2.6 Miles, North of Blossburg Borough, Covington Township180,000

(Base Project Allocation - $180,000)

(2) SR 6, Restoration, Mansfield to Mainsburg Earmark, Mansfield Borough and Richmond Township570,000

(Base Project Allocation - $550,000)

(Design and Contingencies - $20,000)

Section 360. Union County.

Projects are as follows:

(1) SR 11 and SR 15, Design and Construction of Central Susquehanna Thruway from SR 147 in Northumberland County to Intersection with Selinsgrove Bypass in Snyder County95,000,000

(Base Project Allocation - $95,000,000)

Section 361. Venango County.

Projects are as follows:

(1) SR 80, Interstate Restoration, Interstate Preventative Maintenance, SR 80, Milepost 34 to Milepost 42, Clinton and Scrubgrass Townships and Clintonville Borough2,500,000

(Base Project Allocation - $2,500,000)

(2) SR 80, I-80 Milepost 34 to Milepost 42 Interstate Maintenance, Clinton and Scrubgrass Townships and Clintonville Borough1,000,000

(Base Project Allocation - $1,000,000)

Section 362. Warren County (Reserved).

Section 363. Washington County.

Projects are as follows:

(1) SR 40, Add Lane, US 40, I-70 to PA 18, City of Washington660,000

(Base Project Allocation - $400,000)

(Land Allocation - $150,000)

(Design and Contingencies - $110,000)

(2) SR 70, New Interchange, Bentleyville Interchange, Bentleyville Borough3,950,000

(Base Project Allocation - $3,000,000)

(Land Allocation - $700,000)

(Design and Contingencies - $250,000)

(3) SR 70, Addition of Lane, Restoration, I-70 from I-79 South to I-79 North, South Strabane Township2,900,000

(Base Project Allocation - $2,500,000)

(Land Allocation - $200,000)

(Design and Contingencies - $200,000)

(4) SR 88, Addition of Turning Lane and Traffic Signal, Intersection of SR 88 and SR 837, New Eagle Boroug1,600,000

(Base Project Allocation - $900,000)

(Land Allocation - $200,000)

(Design and Contingencies - $500,000)

(5) SR 79, PM 2, South Strabane Township510,000

(Base Project Allocation - $450,000)

(Design and Contingencies - $60,000)

(6) SR 70, Reconstruction No.2, I-70, Buffalo and North Franklin Townships120,000

(Design and Contingencies - $120,000)

(7) SR 70, Reconstruction, I-70 South Junction to SR 519, South Strabane and Somerset Townships120,000

(Design and Contingencies - $120,000)

(8) SR 19, Corridor Safety Improvement, Early Options Study, SR 19, Amwell, Peters, North Strabane and South Strabane Townships20,000

(Design and Contingencies - $20,000)

(9) SR 70, Interstate Improvements, SR 70, Milepost 0 to Milepost 18, Donegal, Buffalo, North Franklin and Canton Townships and City of Washington2,570,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $500,000)

(10) SR 70, Interstate Improvements, SR 70, Milepost 18 to Milepost 40, South Strabane, Somerset, Fallowfield Townships and Bentleyville Boroug2,570,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $500,000)

(11) SR 79, Interstate Improvements, SR 79, Milepost 21 to Milepost 34, Amwell and South Strabane Townships7,070,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $5,000,000)

(12) SR 79, Interstate Improvements, SR 79, Milepost 34 to Milepost 49, Cecil, Chartiers, North Strabane and South Strabane Townships and Canonsburg Borough6,570,000

(Base Project Allocation - $1,500,000)

(Land Allocation - $70,000)

(Design and Contingencies - $5,000,000)

(13) SR 22, Highway Improvements, SR 22 and State Line to SR 18, Hanover Township1,270,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $200,000)

(14) SR 22, Highway Improvements, SR 22 and SR 18 to County Line, Hanover, Smith and Robinson Townships1,270,000

(Base Project Allocation - $1,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $200,000)

Section 364. Wayne County (Reserved).

Section 365. Westmoreland County.

Projects are as follows:

(1) SR 0, New Roadway, Congestion Reduction, Jeannette Truck Route, City of Jeannette864,000

(Base Project Allocation - $750,000)

(Land Allocation - $30,000)

(Design and Contingencies - $84,000)

(2) SR 30, Corridor Safety, Congestion Reduction, US 30 Corridor Safety Improvements, Irwin Borough, Hempfield and North Huntingdon Townships3,130,000

(Base Project Allocation - $3,000,000)

(Land Allocation - $30,000)

(Design and Contingencies - $100,000)

(3) SR 31, Intersection Improvements, SR 31 at Braddock Avenue, Mt. Pleasant Borough550,000

(Base Project Allocation - $200,000)

(Land Allocation - $150,000)

(Design and Contingencies - $200,000)

(4) SR 66, Intersection and Approaches Signal Improvements and Additional Lane, SR 66, Beaver Run Road, Washington Township910,000

(Base Project Allocation - $160,000)

(Land Allocation - $225,000)

(Design and Contingencies - $525,000)

(5) SR 982, Signal Enhancements and Miscellaneous Roadway Work, Westmoreland County, Traffic Signal Enhancements, Various Municipalities667,000

(Base Project Allocation - $480,000)

(Land Allocation - $125,000)

(Design and Contingencies - $62,000)

(6) SR 1053, Widen and Restoration of Georges Station Road, Hempfield Township1,150,000

(Base Project Allocation - $200,000)

(Land Allocation - $500,000)

(Design and Contingencies - $450,000)

(7) SR 3011, Intersection, Safety and Drainage Improvements, SR 3011, Finley Road, Rostraver Township370,000

(Base Project Allocation - $300,000)

(Land Allocation - $70,000)

(8) SR 70, Interstate Improvements, SR 70 Milepost 40 to Milepost 48, Rostraver and South Huntingdon Townships and Speers and North Belle Vernon Boroughs2,570,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $500,000)

(9) SR 70, Interstate Improvements, SR 70, Milepost 48 to Milepost 57.5, South Huntingdon, Sewickley and Hempfield Townships and New Stanton Borough2,570,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $70,000)

(Design and Contingencies - $500,000)

(10) SR 136, Signal Improvement, SR 136 at T-30 Eastbound Ramp, City of Greensburg330,000

(Base Project Allocation - $100,000)

(Land Allocation - $50,000)

(Design and Contingencies - $180,000)

(11) SR 51, Intersection Improvements, SR 51 and Darr Road Intersection, Rostraver Township258,000

(Base Project Allocation - $156,000)

(Land Allocation - $36,000)

(Design and Contingencies - $66,000)

(12) SR 1045, Relocation, SR 1045 Relocation Phase 2, Unity Township460,000

(Base Project Allocation - $460,000)

(13) SR 70, I-70, Smithton Bridge to Smithton Interchange, Rostraver and South Huntingdon Townships100,000

(Design and Contingencies - $100,000)

(14) US 30, Perform Roadway Noise Study, Conduct Public Meeting, Design and Install 1,865 Feet of Sound Wall in a Demonstration Project along Todd School Road, Take Eight Strips of Private Property and One House, Relocate Small Portion of Roadway, Hempfield Township2,500,000

(Base Project Allocation - $1,880,000)

(Land Allocation - $210,000)

(Design and Contingencies - $410,000)

Section 366. Wyoming County (Reserved).

Section 367. York County.

Projects are as follows:

(1) SR 177, Provide Left Turn Lanes at the Intersection of Industrial Drive and Yorktown Road, Fairview Township1,000,000

(Base Project Allocation - $1,000,000)

(2) SR 3070 and SR 94, Intersection Relocation, Roadway Realignments and Traffic Signal, Intersection of SR 3070, Black Rock Road with SR 94, Baltimore Street and Baer Avenue, Penn Township1,016,000

(Base Project Allocation - $640,000)

(Land Allocation - $200,000)

(Design and Contingencies - $176,000)

(3) Concord Road, Road Extension, Concord Road, Springettsbury Township125,000

(Base Project Allocation - $125,000)

(4) Intermodal Facility, Design and Construct Access to Intermodal Facility Track, Five New Lines and Switches, Three New Bridges400,000

(Base Project Allocation - $400,000)

Section 368. Statewide projects.

Projects are as follows:

(1) Crawford, Forest, Venango and Warren Counties, Construction and Monitoring of Wetlands, Countywide Wetland Banking, Various Municipalities130,000

(Base Project Allocation - $60,000)

(Land Allocation - $30,000)

(Design and Contingencies - $40,000)

(2) Interstate Line Item, Central Office, Statewide3,700,000

(Base Project Allocation - $3,700,000)

(3) Capitalization of Infrastructure Bank, Pennsylvania Infrastructure Bank, Statewide60,000,000

(Base Project Allocation - $60,000,000)

CHAPTER 5

(RESERVED)

CHAPTER 7

MISCELLANEOUS PROVISIONS

Section 701. Federal funds.

All moneys received from the Federal Government for the construction of the projects specifically itemized in this act are also hereby appropriated for those projects.

Section 702. Allocation of funds.

Whenever as determined by the Department of Transportation that the full estimated financial costs of the projects itemized in this act are not necessary for the proper design, acquisition or construction of such projects, the excess funds no longer required may be allocated by the Department of Transportation to increase the estimated costs of any one or more of the projects specifically itemized in a capital budget.

Section 703. Estimated useful life.

The General Assembly states that the estimated useful life of the highway capital projects itemized in this act is 30 years.

Section 704. Effective date.

This act shall take effect immediately.