Pennsylvania Act 2008-41 — CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2007-2008 - ENACTMENT

act-2008-0-412008 Pa. Act 41Law

Act text
CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2007-2008 - ENACTMENT
Act of Jul. 4, 2008, P.L. 329, No. 41Cl. 72

AN ACT

Providing for the capital budget for the fiscal year 2007-2008; itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance capital projects, flood control projects, Keystone Recreation, Park and Conservation Fund projects, Environmental Stewardship Fund projects, Motor License Fund projects, State forestry bridge projects, Pennsylvania Fish and Boat Commission projects, Manufacturing Fund projects, State ATV/Snowmobile Fund projects, State transportation enhancement funds projects and federally funded projects to be constructed or acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Pennsylvania Fish and Boat Commission and the Department of Transportation, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Pennsylvania Fish and Boat Commission or the Department of Transportation; stating the estimated useful life of the projects; providing an exemption; providing for limitation on certain capital projects, for special provisions for certain redevelopment assistance capital projects and for preemption of local ordinances for Department of Corrections projects; making appropriations; and making a repeal.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1. Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2007-2008.

Section 2. Total authorizations.

(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $5,972,762,000.

(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $173,481,000.

(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt shall be $954,737,000.

(d) Redevelopment assistance.--The total authorization for the additional capital projects in the category of redevelopment assistance capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns and to be financed by the incurring of debt shall be $7,533,808,000.

(e) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt shall be $96,199,000.

(f) Keystone Recreation, Park and Conservation Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 and to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the Keystone Recreation, Park and Conservation Fund shall be $34,353,000.

(g) Environmental Stewardship Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 9 and to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the Environmental Stewardship Fund shall be $159,705,000.

(h) State forestry bridge projects.--The total authorization for the capital projects itemized in section 10 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax) shall be $11,215,000.

(i) General Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11 and to be developed or constructed by the Department of General Services, its successors or assigns and to be financed from current revenues in the General Fund shall be $29,600,000.

(j) Manufacturing Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11.1 and to be constructed by the Department of General Services, its successors or assigns and to be financed from current revenues in the Manufacturing Fund shall be $3,000,000.

(k) Fish and Boat Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11.2 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $79,100,000.

(l) State ATV/snowmobile projects.--The total authorization for the capital projects itemized in section 11.3 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the State ATV/Snowmobile Fund shall be $1,000,000.

(m) State transportation enhancement projects.--The total authorization for the capital projects itemized in section 11.4 to be constructed by the Department of Conservation and Natural Resources, its successors and assigns and to be financed from current revenues from State transportation enhancement funds shall be $1,000,000.

(n) Motor License Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11.5 and to be developed by the Department of General Services, its successors or assigns, for the Department of Transportation, and to be financed by the incurring of debt or from current revenues in the Motor License Fund is $24,144,000.

Section 3. Itemization of public improvement capital projects.

Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Office of Administration
(i) Statewide mobile radio and microwave system
(A) Additional funds for DGS project 950-10, Statewide mobile radio and microwave system36,100,000

(Base Project Allocation - $36,100,000)

(ii) Commonwealth Technology Center
(A) Additional funds for DGS project 920-1 security and availability of operations1,000,000

(Base Project Allocation - $1,000,000)

(2) Department of Agriculture
(i) Health Diagnostic Laboratory
(A) Construct a new Pennsylvania Animal Health Diagnostic Laboratory (PADLS) with Bio-Safety Level-3 capabilities to support PADLS33,000,000

(Base Project Allocation - $29,700,000)

(Design and Contingencies - $3,300,000)

(ii) State Dairy Farm
(A) Rehabilitate and construct several support facilities for State dairy farm to complement existing dairy operation500,000

(Base Project Allocation - $450,000)

(Design and Contingencies - $50,000)

(iii) Pennsylvania fairs
(A) Pennsylvania fairs matching funds5,000,000

(Base Project Allocation - $5,000,000)

(iv) Department Headquarters
(A) Supplemental funding to Project No. 700.43 to complete upgrades, repairs and renovations to original electrical, roofing and mechanical systems5,000,000
(v) State farm enhancement
(A) Construction and renovation of State farm site in Berks County5,000,000
(B) Construction and renovation of State farm site in Snyder County5,000,000
(vi) Farm Show Complex
(A) Amending the description of Project No. 700.41, Phase III, Act 1999-352,000,000
(2.1) Capitol Preservation Committee
(i) Soldier Memorial
(A) For a Soldier Memorial identifying the Middle East Conflicts that would be developed in keeping with other memorials already placed in the Capitol Complex Soldiers' Grove park and improvements surrounding the memorial800,000
(3) Department of Conservation and Natural Resources
(i) Bald Eagle State Park
(A) Rehabilitate and develop a family campground at the State park, including infrastructure2,000,000

(Base Project Allocation - $2,000,000)

(i.1) Carbon County
(A) Construct small nature inn6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(ii) Chester County
(A) Acquire the Strawbridge property lands in Chester County4,000,000

(Land Allocation - $4,000,000)

(B) Acquisition and development of the Shryock property2,000,000
(iii) Clear Creek State Park
(A) Construct new maintenance facility, including infrastructure1,800,000

(Base Project Allocation - $1,800,000)

(iv) Cook Forest State Park
(A) Replace the office/visitors center2,500,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $500,000)

(B) Replace the pit latrines with modern flush facilities, including infrastructure1,000,000

(Base Project Allocation - $800,000)

(Design and Contingencies - $200,000)

(iv.1) Crawford County
(A) Construct small nature inn6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(v) Erie Bluffs State Park
(A) Provide for construction of the initial development of 540-acre area, including infrastructure, roads, trails, parking lots and boating facilities10,000,000

(Base Project Allocation - $8,000,000)

(Design and Contingencies - $2,000,000)

(vi) Forest District 3
(A) Rehabilitate and improve the Gunter Valley Dam to return it to a safe condition and in compliance with current requirements7,000,000

(Base Project Allocation - $5,600,000)

(Design and Contingencies - $1,400,000)

(vii) Forest District 4
(A) Repair and repave roads, including returning a portion back to a gravel road5,000,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $1,000,000)

(viii) Forest District 7
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(ix) Forest District 9
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(x) Forest District 10
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(xi) Forest District 12
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(xii) Forest District 13
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(xiii) Forest District 15
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(xiv) Forest District 16
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(xiv.1) Forest District 19
(A) Construct rest facilities and parking lots3,500,000

(Base Project Allocation - $2,800,000)

(Design and Contingencies - $700,000)

(xv) Forest District 20
(A) Rehabilitate roadways throughout the forest to ensure safety and to provide public access for outdoor activities3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(B) Rehabilitate rest facilities, parking lots and multiple use trails and refurbish living quarters as a departmental training facility with necessary equipment2,500,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $500,000)

(xvi) Gouldsboro State Park
(A) Rehabilitate day-use area and provide for the replacement of lifeguard building, bathhouse, boat rental building and comfort station, including infrastructure2,500,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $500,000)

(xvi.1) Kinzua Bridge State Park
(A) Reconstruction of the Kinzua viaduct42,000,000
(xvi.2) Lancaster County
(A) Development of a Rails-to-Trails project in conjunction with the Lancaster County Planning Commission, Manor, Conestoga, Martic, Providence, Eden, Bart and Sadbury Townships, Quarryville Borough and the Lancaster County Conservancy9,000,000
(xvi.3) Laurel Mountain State Park
(A) Restoration and rehabilitation of park5,000,000

(Base Project Allocation - $5,000,000)

(B) Infrastructure, construction and other related costs for the renovation and rehabilitation of the Laurel Mountain Ski Resort facilities1,500,000
(xvii) Lehigh Gorge State Park
(A) Provide for the acquisition of land necessary to complete the scheme for the park in conformance with Statewide recreation plan3,500,000

(Land Allocation - $3,500,000)

(xvii.1) Marsh Creek State Park
(A) Acquisition, demolition and development of the Dorlans Mill/Shryock property5,000,000

(Base Project Allocation - $2,500,000)

(Land Allocation - $2,000,000)

(Design and Contingencies - $500,000)

(xvii.2) McKean County
(A) Construct small nature inn6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(xviii) Montgomery County
(A) Acquire the Erdenheim Farm lands in Montgomery County4,000,000
(Land Allocation - $4,000,000)
(xviii.1) Montgomery County and Philadelphia County
(A) Engineering and construction of Cresheim Trail between Valley Green in Fairmount Park in Philadelphia and Fort Washington State Park2,500,000
(xix) Nescopeck State Park
(A) Develop day-use area and provide for the development of recreational and educational facilities for day use3,000,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $500,000)

(xix.1) Ohiopyle State Park
(A) Develop a visitors center and park office to accommodate park usage5,000,000

(Base Project Allocation - $4,700,000)

(Design and Contingencies - $300,000)

(xx) Presque Isle State Park
(A) Provide for the replenishment of sand for the park's beaches2,100,000
(xx.1) Promised Land State Park
(A) Rehabilitate and improve lower lake dam to return it to a safe condition and in compliance with current requirements3,500,000

(Base Project Allocation - $2,800,000)

(Design and Contingencies - $700,000)

(B) Rehabilitation to infrastructure139,000
(Base Project Allocation - $139,000)
(xxi) Quehanna Wild Area
(A) Provide for the remediation of land of radioactive materials within the Quehanna wild area at the former nuclear reactor site2,500,000

(Base Project Allocation - $2,500,000)

(B) Facilitate the cleanup and reclamation of the Quehanna reactor site at Moshannon State Forest1,834,000

(Base Project Allocation - $1,834,000)

(xxii) Ricketts Glen State Park
(A) Repair and repave roads, including returning a portion back to a gravel road3,500,000

(Base Project Allocation - $2,800,000)

(Design and Contingencies - $700,000)

(xxiii) S.B. Elliott State Park
(A) Additional funding to complete the visitors center and overnight lodging, including furnishings and equipment3,500,000

(Base Project Allocation - $3,500,000)

(xxiv) Shikellamy State Park
(A) Rehabilitate marina damaged by flood waters in 2005 and 2006, including new docks, railings, concrete bulkheads and courtesy docks1,500,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $300,000)

(4) Department of Corrections
(i) State Correctional Institution at Albion
(A) Replace buried perimeter intrusion system around entire perimeter of the institution800,000

(Base Project Allocation - $650,000)

(Design and Contingencies - $150,000)

(i.1) State Correctional Institution at Cambridge Springs
(A) Construct a new 128-cell L-3 close security housing unit with 230-bed capacity with infrastructure upgrade17,800,000

(Base Project Allocation - $14,800,000)

(Design and Contingencies - $3,000,000)

(ii) State Correctional Institution at Camp Hill
(A) Additional funds for DGS project 573-26, replacement of Group 1 plumbing components8,000,000

(Base Project Allocation - $6,400,000)

(Design and Contingencies - $1,600,000)

(B) Additional funds for DGS project 573-27, provide additional funding for Phase 2 to complete the plumbing repairs started under project 573-27 to include steam pipe replacement and repairs to pipe tunnels6,000,000

(Base Project Allocation - $4,800,000)

(Design and Contingencies - $1,200,000)

(C) Additional funds for DGS project 573-29, replace water main infrastructure1,000,000
(Base Project Allocation - $825,000)
(Design and Contingencies - $175,000)
(iii) State Correctional Institution at Coal Township
(A) Construct a new 128-cell L-3 close security housing unit with 230-bed capacity with infrastructure upgrade15,500,000

(Base Project Allocation - $12,900,000)

(Design and Contingencies - $2,600,000)

(B) Replace buried perimeter intrusion system around entire perimeter of the institution650,000
(Base Project Allocation - $540,000)
(Design and Contingencies - $110,000)
(iv) State Correctional Institution at Cresson
(A) Renovate and upgrade the heating and air conditioning system serving the medical building550,000
(Base Project Allocation - $440,000)
(Design and Contingencies - $110,000)
(B) Replace the Del Norte perimeter intrusion system around the entire perimeter of the institution700,000
(Base Project Allocation - $580,000)
(Design and Contingencies - $120,000)
(C) Additional funds for DGS project 1574-4, design a new kitchen and loading dock to serve an expanded inmate population4,000,000

(Base Project Allocation - $3,300,000)

(Design and Contingencies - $700,000)
(iv.1) State Correctional Institution at Dallas
(A) Additional funds for DGS project 578-19, Phase 2, rebuild the No. 2 coal boiler with controls and required piping and demolish No. 3 boiler that cannot be repaired5,000,000

(Base Project Allocation - $4,200,000)

(Design and Contingencies - $800,000)
(v) State Correctional Institution at Fayette
(A) Replace heating and cooling distribution lines10,500,000

(Base Project Allocation - $8,750,000)

(Design and Contingencies - $1,750,000)

(vi) State Correctional Institution at Forest
(A) Construct a new 128-cell L-5 close security housing unit with capacity with infrastructure upgrade17,500,000

(Base Project Allocation - $14,600,000)

(Design and Contingencies - $2,900,000)

(vii) State Correctional Institution at Frackville
(A) Replace and upgrade the institution's main electrical switchgear520,000
(Base Project Allocation - $416,000)
(Design and Contingencies - $104,000)
(B) Construct a new 2,000-bed L-3 medium security prison on the grounds of SCI Frackville, including infrastructure and road work to incorporate the two facilities at this site200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(viii) State Correctional Institution at Graterford
(A) Construct a new 2,000-bed L-3 medium security prison on the grounds of SCI Graterford, including infrastructure and road work to incorporate the two facilities at this site200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(B) Construct new roadway to access SCI Graterford off Route 73695,000
(Base Project Allocation - $556,000)
(Design and Contingencies - $139,000)
(C) Additional funds for DGS project 577-29, Phase 3, including replacing all plumbing and plumbing fixtures in cell blocks C, D and E15,000,000

(Base Project Allocation - $12,500,000)

(Design and Contingencies - $2,500,000)

(D) Construct a new L-3 medium or L-4 close Security prison with up to 2,100 beds on the grounds of SCI Graterford, including necessary infrastructure and road work200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(ix) State Correctional Institution at Huntingdon
(A) Construct a new 2,000-bed L-5 maximum security prison on the grounds of SCI Huntingdon, including infrastructure and road work to incorporate the two facilities at this site200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(B) Upgrade electrical services to blocks and cells to meet current electrical demands2,625,000

(Base Project Allocation - $2,200,000)

(Design and Contingencies - $425,000)

(x) State Correctional Institution at Laurel Highlands
(A) Replace roofs on dietary building No.4 and housing unit building800,000
(Base Project Allocation - $640,000)
(Design and Contingencies - $160,000)
(B) Additional funds for DGS Project 376-5, construct a new 230-bed capacity facility and upgrade infrastructure and security2,000,000

(Base Project Allocation - $1,600,000)

(Design and Contingencies - $400,000)

(C) Land acquisition and construction of cogeneration building as part of institution's guaranteed energy savings project100,000
(Land Allocation - $100,000)
(x.1) State Correctional Institution at Mahanoy
(A) Construct a new 2,000-bed L-3 medium security prison on the grounds of SCI Mahanoy, including infrastructure and road work to incorporate the two facilities at this site200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(B) Replace buried perimeter intrusion system around entire perimeter of the institution700,000
(Base Project Allocation - $580,000)
(Design and Contingencies - $120,000)
(xi) State Correctional Institution at Mercer
(A) Replace roofs on medical building, M Block and G Block
(Base Project Allocation - $520,000)650,000
(Design and Contingencies - $130,000)
(B) Additional funds for DGS Project 1572-12, construct a new 230-bed capacity facility and upgrade infrastructure and security4,500,000

(Base Project Allocation - $3,700,000)

(Design and Contingencies - $800,000)
(C) Expand the kitchen preparation area and dining area to include new equipment and renovations as required for expanded population3,000,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $500,000)
(xii) State Correctional Institution at Muncy
(A) Replace roofs on Administration building, Laundry building, Storeroom building, Kitchen building and housing units A Block, M Block, K Block and F Block2,300,000

(Base Project Allocation - $1,840,000)

(Design and Contingencies - $460,000)
(B) Additional funds for DGS Project 574-26, addition of two new cell blocks for close security, expansion of infirmary, outside warehouse, electrical and boiler upgrades; also including funds for utility upgrades and kitchen and dining room expansion7,700,000

(Base Project Allocation - $6,400,000)

(Design and Contingencies - $1,300,000)

(C) Replace infirmary and build new long-term care unit as required to meet the demand of a large increase in female inmates and, as the facility serving geriatric inmates, more space is needed for these services6,250,000

(Base Project Allocation - $5,200,000)

(Design and Contingencies - $1,050,000)

(xiii) State Correctional Institution at Pine Grove
(A) Construct a new 128-cell L-3 close security housing unit with 230-bed capacity with infrastructure upgrade15,500,000

(Base Project Allocation - $12,900,000)

(Design and Contingencies - $2,600,000)

(xiv) State Correctional Institution at Rockview
(A) Construct a new 2,000-bed L-3 medium security prison on the grounds of SCI Rockview, including infrastructure and road work to complete the two facilities at this site200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(xv) State Correctional Institution at Smithfield
(A) Additional funds for DGS Project 1573-7, expand kitchen/dining facility2,500,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $500,000)

(B) Additional funds for DGS Project 1573-9, construct a new 230-bed capacity facility and upgrade infrastructure and security5,000,000

(Base Project Allocation - $4,100,000)

(Design and Contingencies - $900,000)

(xvi) New State Correctional Institution in Luzerne County
(A) Construct a new 2,300-bed L-3 medium security prison within a five-mile radius of SCI Retreat. Includes construction of all other facilities as necessary to operate institution200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(xvii) New State Correctional Institution in Northumberland County
(A) Construct a new 2,000-bed L-3 medium security prison, including acquisition of land, construction of infrastructure and construction of all other facilities as necessary to operate the institution200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(xviii) Corrections training rifle range and indoor handgun range
(A) Construction of a corrections training rifle range and indoor handgun range2,000,000

(Base Project Allocation - $2,000,000)

(xix) New State Correctional Institution in Fayette County
(A) Construct a new 2,000-bed L-3 medium security prison, including construction of all other facilities as necessary to operate institution200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(xx) New State Correctional Institution in Armstrong County
(A) Construct a new 2,300-bed L-3 medium security prison, including construction of all other facilities as necessary to operate the institution200,000,000

(Base Project Allocation - $160,000,000)

(Design and Contingencies - $40,000,000)

(xxi) New State Correctional Institution in Philadelphia County
(A) Construct a new 2,300-bed L-3 medium security prison, including acquisition of land, infrastructure and construction of all other facilities as necessary to operate the institution200,000,000

(Base Project Allocation - $200,000,000)

(xxii) State Correctional Institution at Somerset
(A) Replace buried perimeter intrusion system around entire perimeter of the institution800,000
(Base Project Allocation - $650,000)
(Design and Contingencies - $150,000)
(xxiii) State Correctional Institution at Waymart
(A) Upgrade stormwater and sewer lines by separating the rain leaders and sewer lines to meet current codes and sewer authority requirements along with sewer and storm infrastructure2,875,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $475,000)
(5) Department of Education
(i) Department of Education headquarters
(A) Provide improvements and upgrades to renovate three floors of the Department of Education headquarters building at 333 Market Street1,750,000

(Base Project Allocation - $1,600,000)

(Design and Contingencies - $150,000)

(i.1) Scranton State School for the Deaf
(A) Provide improvements and upgrades to the emergency, mechanical and electrical systems throughout the campus7,560,000

(Base Project Allocation - $6,574,000)

(Design and Contingencies - $986,000)

(B) Additional funds for DGS project 416-15, life safety, health and security upgrades3,500,000

(Base Project Allocation - $3,500,000)

(C) Install approximately 750 feet of concrete culvert structure to route Meadowbrook Creek underground8,995,000

(Base Project Allocation - $8,095,000)

(Design and Contingencies - $900,000)

(D) Additional funds for DGS project 416-14, renovate gymnasium937,000
(Base Project Allocation - $937,000)
(E) Construct an addition designed for studio broadcasting and development of video training programs for the deaf and hard of hearing3,450,000

(Base Project Allocation - $3,105,000)

(Design and Contingencies - $345,000)

(ii) Pennsylvania State University
(A) Provide for the capital renewal for campuses in the eastern region of the university, including code compliances and infrastructure upgrades7,000,000

(Base Project Allocation - $7,000,000)

(B) Provide for the capital renewal for campuses in the central region of the university, including code compliances and infrastructure upgrades7,000,000

(Base Project Allocation - $7,000,000)

(C) Provide for the capital renewal for campuses in the western region of the university, including code compliances and infrastructure upgrades7,000,000

(Base Project Allocation - $7,000,000)

(D) Altoona campus, engineering and research and extension building30,000,000
(E) Dubois campus, engineering research and extension building30,000,000
(F) University Park, engineering administration, research and extension building80,000,000
(G) Capital Renewal, Phase II, Eastern Region14,000,000
(H) Capital Renewal, Phase II, Central Region14,000,000
(I) Capital Renewal, Phase II, Western Region14,000,000
(J) Capital Renewal, Phase IV at University Park40,000,000
(K) Renovation, rehabilitation and construction costs for a chemical engineering building51,700,000
(L) Engineering research and extension facility in Philadelphia30,000,000
(M) Construction of applied research lab building in Innovation Park, including site, utility, parking, landscaping, signage and other related costs50,000,000
(N) Eberly Campus, Fayette, construction of annex to community center1,500,000
(O) Eberly Campus, Fayette, construction of annex to library1,750,000
(P) Eberly Campus, Fayette, construction of baseball/softball complex1,500,000
(Q) Eberly Campus, Fayette, renovations to the Center for Community and Public Safety office800,000
(R) Eberly Campus, Fayette, construction of residence hall20,000,000
(S) Provide additional funds for the capital renewal for campuses in the eastern region of the university, including code compliances and infrastructure upgrades14,000,000

(Base Project Allocation - $14,000,000)

(iii) University of Pennsylvania
(A) Construction of a Center for Nanotechnology Research and Development30,000,000

(Base Project Allocation - $30,000,000)

(B) Construction of a new Life Sciences Building16,000,000

(Base Project Allocation - $16,000,000)

(iv) University of Pittsburgh
(A) Providing for upgrades and deferred maintenance needs on all campuses20,000,000

(Base Project Allocation - $16,667,000)

(Design and Contingencies - $3,333,000)

(B) Construction and other related costs for the renovation of the Manufacturing Assistance Center375,000
(C) Additional funds for DGS Project No. 1103-385, construction of Salk Hall addition30,000,000
(D) Renovations and addition to Chevron Science Center25,000,000
(E) Programmatic renovations, Phase II, all campuses20,000,000
(F) Construction, infrastructure improvements and other costs related to a school of nursing at the University of Pittsburgh at Johnstown4,000,000
(v) Lincoln University
(A) Additional funds to renovate Langston Hughes Library and correct problems from structural design flaws, continuation of DGS Project No. 1101-447,000,000

(Base Project Allocation - $5,600,000)

(Design and Contingencies - $1,400,000)

(B) Additional funds for completion of renovation of Wright Hall building systems, classrooms and laboratory, including ADA requirements for DGS Project No. 1101-434,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(C) Additional funds for landscaping, sidewalks and other projects, Phase II, DGS Project No. 1101-4515,000,000
(D) Additional funds for DGS Project No. 1101-28A and emergency generators1,800,000
(E) Completely renovate John Miller Dickey Hall to meet modern needs20,000,000

(Base Project Allocation - $16,000,000)

(Design and Contingencies - $4,000,000)

(v.1) Lehigh Carbon Community College
(A) Construction of four athletic fields2,200,000
(B) Acquisition, construction, infrastructure and other related costs for student housing at the Morgan Center, Tamaqua Campus7,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $2,000,000)

(v.2) Community College of Allegheny County
(A) Construction of Science Center14,500,000
(vi) Luzerne County Community College
(A) Construction, infrastructure and other related costs for a public safety institute1,000,000
(B) Acquisition, construction, infrastructure and other related costs for student housing2,000,000
(C) Acquisition, construction, infrastructure and other related costs for a new culinary arts building with parking3,000,000
(D) Construction and related costs for the Kanjorski Building Health Sciences Center at Luzerne Community College2,352,000
(vii) Northampton Community College
(A) Monroe Campus, construction of new campus to increase the availability of academic square footage44,000,000

(Base Project Allocation - $44,000,000)

(B) Northampton campus, renovations and infrastructure improvements to the boiler and cooling towers500,000
(C) Northampton campus, renovations and expansion of the automotive technology program facility1,000,000
(D) Fowler Family Southside Center renovations1,000,000
(viii) Montgomery County Community College
(A) Construction, infrastructure and other related costs to expand the Science Center750,000
(Base Project Allocation - $750,000)
(B) Roof replacement on 101 College Drive building500,000
(C) Exterior door replacements on central campus facilities135,000
(D) Construction of a walkway around the perimeter of central campus323,000
(E) Renovations and other related costs for the relocation and expansion of the theater facility400,000
(viii.1) Community College of Philadelphia
(A) Construction and expansion of the Northeast Philadelphia Regional Center10,100,000
(viii.2) Pennsylvania Highlands Community College
(A) Construction of Workforce Development Center500,000
(viii.3) Reading Area Community College
(A) Infrastructure improvements and construction of Reading Area Community College Academic Classroom Instructional Center20,000,000
(viii.4) Temple University
(A) Design and construction of a research, laboratory and office building100,000,000
(ix) Thaddeus Stevens College of Technology4,000,000
(A) Construction and other related costs for the Thaddeus Stevens Technology Center
(x) Westmoreland County Community College
(A) Construction and other related costs for the New Kensington Education Center2,500,000
(B) Acquisition, infrastructure, construction and other related costs for the construction of a Workforce and Economic Development Training Center, located in New Kensington3,700,000
(C) Infrastructure, construction and other related costs for the construction of a Workforce and Economic Development Training Center, located in Youngwood3,700,000
(D) Infrastructure, construction and other costs related to the expansion of the Public Safety Training Center3,750,000
(xi) York Community College
(A) Acquisition, construction, infrastructure and other related costs for downtown York Community College campus7,000,000
(xii) Bucks County Community College
(A) Renovations and ADA accessibility improvements to a gymnasium1,000,000
(B) Renovations and upgrades to the Rollins Student Center1,351,000
(C) Construction of a classroom and faculty office building8,000,000
(xiii) Butler County Community College
(A) Infrastructure, construction and renovation of the Beck Library and Learning Resource Center2,000,000
(xiv) Harrisburg Area Community College
(A) Acquisition, construction and other related costs for community college campus development in York County30,000,000
(6) Department of Environmental Protection
(i) Allegheny County
(A) Wet weather overflow control demonstration facilities in Millvale and Munhall Boroughs5,000,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $1,000,000)

(B) Municipal sewer stream removal programs5,000,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $1,000,000)

(C) Pine Creek watershed, stormwater management and flood protection for Lower Allison Park4,623,000
(i.1) Blair County
(A) Construction, infrastructure and other related costs for the Mill Run rehabilitation project76,000
(ii) Bucks County
(A) Construction, infrastructure and other related costs for Bristol Borough flood protection project3,000,000
(B) Construction, infrastructure and other related costs for the flood control and protection project in the Newportville section of Bristol Township1,000,000
(iii) Cambria County
(A) Additional funds for rehabilitation of the Patton flood protection project in the Borough of Patton4,800,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $800,000)

(B) Construct Lancashire No.15 acid mine drainage treatment plant to improve an estimated 25 miles of the west branch of the Susquehanna River10,025,000

(Base Project Allocation - $10,025,000)

(C) Additional funds for the Wilmore flood protection project, construction of a compact levee along the North Branch of the Little Conemaugh River2,400,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $400,000)
(iv) Chester County
(A) Construction, infrastructure and other related costs for the Business 30 flood control project900,000
(v) Clearfield County
(A) Construction and other related costs for stream channel clearing and restoration in Curwensville Borough5,000,000
(vi) Clearfield and/or Cambria County
(A) Construct active acid mine drainage facility for currently untreated mine pool discharge in the Susquehanna River basin to offset agricultural consumptive use demands6,000,000

(Base Project Allocation - $6,000,000)

(vii) Clearfield and Elk Counties
(A) Construct active acid mine drainage facility near the Village of Hollywood, Huston Township, Clearfield County, to restore water quality in the Bennett Branch Sinnemahoning Creek in support of the PA Wilds initiative12,125,000

(Base Project Allocation - $12,125,000)

(viii) Clinton County
(A) Chatham Run flood protection, including repairs to levees along Chatham Run through Pine Creek in Pine Creek Township7,500,000
(viii.1) Columbia County
(A) Construction, infrastructure and other related costs for Fishing Creek flood control project, including gravel bar removal1,000,000
(viii.2) Dauphin County
(A) Stormwater control project in Lower Swatara Township6,000,000
(B) Stormwater control project in Derry Township8,000,000
(ix) Delaware County
(A) Construction, infrastructure and other related costs for Edgemount Square in Newtown Township - stormwater management project300,000
(B) Construction, infrastructure and other related costs for the Radnor Middle School stormwater management project300,000
(C) Construction, infrastructure and other related costs for stormwater management in Ridley Township500,000
(ix.1) Fayette County
(A) Additional funds for DGS project 180-23, additional channel work, adding a flood wall and stabilizing streambanks in Dunbar Borough1,200,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $200,000)

(x) Fulton County
(A) Reconstruct two streams currently flowing into abandoned surface mine pits in order to restore the natural stream flow to the Great Trough Creek2,000,000

(Base Project Allocation - $2,000,000)

(xi) Greene County
(A) Construction, infrastructure and other related costs for Wisecarver Dam rehabilitation in Franklin Township1,500,000
(xii) Indiana County
(A) Construct active acid mine drainage facility near the abandoned Wehrum shaft to treat discharges from two abandoned mine complexes discharging to Blacklick Creek6,000,000

(Base Project Allocation - $6,000,000)

(xiii) Luzerne County
(A) Additional funds for DGS Project 184-23 Mill Creek flood protection project in Avoca and Dupont Boroughs6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(B) Rehabilitation of DGS Project 180-37 Wade Run stream improvement project in the Borough of Swoyersville1,200,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $200,000)
(C) Construction, infrastructure and other related costs for Ashley Solomon Creek Tunnel Project750,000
(xiv) Lycoming County
(A) Design, infrastructure and construction of cost-effective and affordable flood protection measures along the Loyalsock Creek within the Borough of Montoursville7,500,000
(B) Design, infrastructure and construction of flood mitigation protection measures along the Lycoming Creek within Old Lycoming, Lycoming and Loyalsock Townships11,000,000
(xv) McKean County
(A) Construction of a flood mitigation project on the Allegheny River in the Borough of Port Allegany1,000,000
(xvi) Monroe County
(A) Infrastructure improvements and construction for dike at Laird Technologies building, Delaware Water Gap6,000,000
(B) Flood control project in Paradise Township1,500,000
(xvii) Montgomery County
(A) Additional funds for DGS Project 181-5, construction and other related costs for Ardsley drainage project in Upper Dublin Township2,400,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $400,000)
(xvii.1) Montour County
(A) Additional funds for DGS Project 181-05, Danville Flood Protection Project Phase II, closure structures for Route 11 and railroad bridge, plus remedial measures to existing levee project8,400,000
(xviii) Northampton County
(A) Repair and restoration of south Bethlehem flood control system500,000
(xix) Northumberland County
(A) Construction, infrastructure and other related costs for the Susquehanna River clearing and grubbing project200,000
(B) Construction, infrastructure and other related costs for the Reagan Street Underpass flood abatement project2,200,000
(C) Shoreline stabilization for flood control system in Sunbury Borough750,000
(xx) Somerset County
(A) Construction, infrastructure and other related costs for the East Main Street flood protection project5,000,000
(xxi) Wayne County
(A) Survey and analyze existing Ridge and Terrace stormwater system and develop alternative stormwater concepts60,000
(xxii) Westmoreland County
(A) Additional funds for DGS Project No. 180-43, Northmont Street area flood protection project in the City of Greensburg3,600,000
(B) Additional funds for DGS project 182-07, Phase 2, rehabilitation of existing levee and new flood walls along Brush Creek in the City of Jeannette3,600,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $600,000)
(C) Export/Murrysville flood control project, Phase 2, excavation, expansion and reconstruction of existing dam located near the border of Export via Puckety Drive for Turtle Creek flood control6,000,000
(7) Department of General Services
(i) Bucks County
(A) Design and construction of a Multi-Agency Emergency Operations Center35,000,000

(Base Project Allocation - $28,000,000)

(Design and Contingencies - $7,000,000)

(ii) Dauphin County
(A) Provide for steam plant replacements and upgrades in Capitol Annex1,563,000

(Base Project Allocation - $1,250,000)

(Design and Contingencies - $313,000)

(B) Provide for remediation of mold, asbestos and other hazmat in buildings and equipment areas in Capitol Annex5,625,000

(Base Project Allocation - $4,500,000)

(Design and Contingencies - $1,125,000)

(C) Upgrade building heating system and install new air conditioning system in Capitol Annex3,750,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $750,000)

(D) Replace main Capitol Complex substation switchgears, including control status board along with transformers and circuit breakers25,000,000

(Base Project Allocation - $20,000,000)

(Design and Contingencies - $5,000,000)

(E) Replace existing 15kv distribution feeders throughout the Capitol Complex and reset the system primary and secondary circuit breakers for proper overall system coordination10,625,000

(Base Project Allocation - $8,500,000)

(Design and Contingencies - $2,125,000)

(F) Refurbish Capitol Park by providing for a new retaining wall along Walnut Street, including new grading and installation of a water conduction system1,000,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $250,000)
(G) Replace all cloth ceilings in halls of the Capitol East Wing1,000,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $250,000)
(H) Replace existing macadam with new covering and sealant to prevent water leakage and replace drains and piping at the parking facility at 22nd and Forster Streets, Harrisburg1,100,000
(Base Project Allocation - $880,000)
(Design and Contingencies - $220,000)
(I) Repair the roof membrane and replace broken pavers at the Rachel Carson State Office Building750,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $150,000)
(J) Provide for a Capitol Complex - Capital Rehabilitation and Improvements Program25,000,000

(Base Project Allocation - $20,000,000)

(Design and Contingencies - $5,000,000)

(K) Design and construction of a Multi-Agency Emergency Operations Center35,000,000

(Base Project Allocation - $28,000,000)

(Design and Contingencies - $7,000,000)

(L) Construction, improvements and other costs related to the Forum Building
(M) Replace high-voltage switchgear and related components in Agriculture Building2,000,000

(Base Project Allocation - $2,000,000)

(N) Replace plaza drains, basins and respective liners at Capitol East Wing1,000,000

(Base Project Allocation - $1,000,000)

(O) Replace current boiler with a more efficient new boiler with capacity for future growth at Capitol Annex750,000
(Base Project Allocation - $750,000)
(P) Remediate asbestos and mold in various buildings and areas throughout the Capitol Annex complex4,500,000

(Base Project Allocation - $4,500,000)

(Q) Replace all electrical panels and rewire the Forum Building to fully occupy the building1,000,000

(Base Project Allocation - $1,000,000)

(R) Install sprinkler system and upgrade fire panels in the Forum Building to include enunciators for better efficiency500,000
(Base Project Allocation - $500,000)
(S) Connect the Forum Building to the central plant for heating and cooling5,000,000

(Base Project Allocation - $5,000,000)

(T) Renovate and refurbish all building restrooms in the Forum Building with new fixtures and plumbing to meet modern codes1,000,000

(Base Project Allocation - $1,000,000)

(U) Clean and sanitize all HVAC ductwork in the Health and Welfare Building to prevent microbial growth and germs from infiltration400,000
(Base Project Allocation - $400,000)
(V) Install sprinkler system and fire/evacuation alarm panels monitored by the Capitol Police Communications Center at the 18th and Herr Street trade shops350,000
(Base Project Allocation - $350,000)
(W) Remediate asbestos-laden tiles throughout the 22nd and Forster Street State Office Building200,000
(Base Project Allocation - $200,000)
(ii.1) Irvis Office Building
(A) Construction, infrastructure and other related costs to renovate the Irvis Office Building45,000,000

(Base Project Allocation - $40,000,000)

(Design and Contingencies - $5,000,000)

(iii) Lebanon County
(A) Design and construction of a Multi-Agency Emergency Operations Center35,000,000

(Base Project Allocation - $28,000,000)

(Design and Contingencies - $7,000,000)

(iv) Philadelphia County
(A) Development and construction of the Mill Creek Community Center12,000,000
(B) Demolition and abatement costs associated with the Paschall Homes redevelopment project8,600,000
(C) Engineering research and extension building30,000,000
(D) Infrastructure improvements for the former Liddonfield Homes at Torresdale Avenue and Jackson Place10,000,000
(E) Acquisition of site, design, construction, infrastructure and other related costs for a facility to be located at 15th and Arch Streets to be leased by the Department of General Services to the City of Philadelphia for use by the First Judicial District for a family Court Building, provided that the City of Philadelphia will continue to support the housing of the family court in an amount equal to current expenditures for utilities and maintenance so that the impact of the new facility will be revenue neutral to the City of Philadelphia200,000,000
(F) Infrastructure and improvements, including streetscape and other related costs for development project10,000,000
(8) Pennsylvania Historical and Museum Commission
(i) Daniel Boone Homestead
(A) Provide for site improvements and restore the boyhood home of Daniel Boone960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(i.1) Erie Maritime Museum
(A) Restore US Brig Niagara, including hull, keel, planking, frame and rails4,800,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $800,000)

(ii) Landis Valley Museum
(A) Provide for the design and construction of a new maintenance building960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(B) Partially renovate and construct new visitors center, including infrastructure12,000,000

(Base Project Allocation - $10,000,000)

(Design and Contingencies - $2,000,000)

(iii) Pennsbury Manor
(A) Rehabilitate up to 23 buildings and site development of infrastructure throughout the site1,920,000

(Base Project Allocation - $1,600,000)

(Design and Contingencies - $320,000)

(iv) Pennsylvania Lumber Museum
(A) Reconfigure entrance to the building to permit one coordinated exhibit gallery rather than two disjointed galleries2,400,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $400,000)

(9) Department of Military and Veterans Affairs
(i) Pittsburgh Hunt Readiness Center, Allegheny County
(A) Rehabilitate readiness center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms3,000,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $600,000)

(i.1) Pittsburgh-Crane Readiness Center, Allegheny County
(A) Rehabilitate the Pittsburgh Readiness Center to enhance State military readiness with adequate facilities to include assembly hall, dining facility, classrooms, administration offices, storage space, restrooms, locker rooms and mechanical room4,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(ii) Southwestern Veterans Center, Allegheny County
(A) Replace sewer main331,000
(Base Project Allocation - $248,000)
(Design and Contingencies - $83,000)
(iii) Hollidaysburg Veterans Home, Blair County
(A) Rehabilitate fire alarm and sprinkler systems in Arnold, Dietary, Eisenhower and MacArthur Halls to meet life safety compliance2,722,000

(Base Project Allocation - $2,268,000)

(Design and Contingencies - $454,000)

(iii.1) Lock Haven Readiness Center, Clinton County
(A) Rehabilitate the Lock Haven Readiness Center to enhance State military readiness with adequate facilities to include assembly hall, dining facility, classrooms, administration offices, storage space, restrooms, locker rooms and mechanical room4,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(iv) Harrisburg Military Post, Dauphin County
(A) Rehabilitate various buildings and facilities on the military post, including assembly halls, classrooms, administrative offices, storage spaces, restrooms, locker rooms, mechanical rooms and expanded parking6,000,000

(Base Project Allocation - $4,800,000)

(Design and Contingencies - $1,200,000)

(iv.1) New Castle Readiness Center, Lawrence County
(A) Rehabilitate the New Castle Readiness Center to enhance State military readiness with adequate facilities to include assembly hall, dining facility, classrooms, administration offices, storage space, restrooms, locker rooms and mechanical room4,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(iv.2) Allentown Readiness Center, Lehigh County
(A) Rehabilitate the Allentown Readiness Center to enhance State military readiness with adequate facilities to include assembly hall, dining facility, classrooms, administration offices, storage space, restrooms, locker rooms and mechanical room5,000,000

(Base Project Allocation - $4,200,000)

(Design and Contingencies - $800,000)

(v) Wilkes-Barre Readiness Center, Luzerne County
(A) Rehabilitate readiness center including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms, mechanical rooms and rehabilitation and expansion of parking4,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(v.1) Plymouth Readiness Center, Luzerne County
(A) Rehabilitate the Plymouth Readiness Center to enhance State military readiness with adequate facilities to include assembly hall, dining facility, classrooms, administration offices, storage space, restrooms, locker rooms and mechanical room4,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(vi) Hermitage Readiness Center, Mercer County
(A) Additional funding to support construction of new Pennsylvania National Guard Readiness Center (DGS Project 963-16)750,000
(Base Project Allocation - $605,000)
(Design and Contingencies - $145,000)
(vii) Southeastern Veterans Center, Montgomery County
(A) Rehabilitate fire alarm and sprinkler systems to meet life safety compliance1,276,000

(Base Project Allocation - $1,063,000)

(Design and Contingencies - $213,000)
(viii) Easton Readiness Center, Northampton County
(A) Additional funding to support construction of new Pennsylvania National Guard Readiness Center (DGS Project 961-9)800,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $200,000)
(ix) Philadelphia Lancaster Avenue Readiness Center, Philadelphia County
(A) Rehabilitate readiness center to include assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(x) Philadelphia Southampton Road Armory, Philadelphia County
(A) Replace several air handling units and associated pumps and motors and install new chiller with ice storage capacity to be made at night that will distribute cooling during the day1,500,000

(Base Project Allocation - $1,300,000)

(Design and Contingencies - $200,000)

(x.1) Washington Readiness Center, Washington County
(A) Rehabilitate the Washington Readiness Center to enhance State military readiness with adequate facilities to include assembly hall, dining facility, classrooms, administration offices, storage space, restrooms, locker rooms and mechanical room5,000,000

(Base Project Allocation - $4,200,000)

(Design and Contingencies - $800,000)

(xi) Southeastern Veterans Center, Chester County
(A) Additional funds for DGS project 960-556,000,000
(xii) Dauphin or Lebanon County
(A) Construction of a new veterans home to be located in Dauphin or Lebanon County, including land acquisition87,000,000

(Base Project Allocation - $75,000,000)

(Land Allocation - $12,000,000)

(xiii) Lebanon County
(A) Additional funds to construct improvements to existing facility at Fort Indiantown Gap735,000
(Base Project Allocation - $698,000)
(Design and Contingencies - $37,000)
(10) Department of Public Welfare
(i) Allentown State Hospital
(A) Upgrade three coal boilers currently in poor condition and replace traveling grate stokers and controls3,600,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $600,000)

(B) Renovate existing water distribution system to domestic water supply and fire hydrant/sprinkler supply lines5,760,000

(Base Project Allocation - $4,800,000)

(Design and Contingencies - $960,000)

(ii) Clarks Summit State Hospital
(A) Replace the electrical distribution center at the sewage treatment plant and install new 400 amp service, motor control center, new transformer and new back-up supply1,200,000

(Base Project Allocation - $1,000,000)

(Design and Contingencies - $200,000)

(ii.1) Danville State Hospital
(A) Additional funds for DGS Project 503-15, exterior improvements to block building2,160,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $360,000)

(iii) Ebensburg Center
(A) Replace all roofed areas which cover residential housing units1,440,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $240,000)

(B) Replace current emergency generators with stand alone outside units in all seven residential units1,500,000

(Base Project Allocation - $1,250,000)

(Design and Contingencies - $250,000)
(iv) Loysville Youth Development Center
(A) Construct a modular multipurpose gym/kitchen/classroom building3,000,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $500,000)

(B) Additional funds for DGS project 588-9, construction of water filtration system540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(v) Loysville Complex, South Mountain Secure Treatment Unit
(A) Construct a modular multipurpose gym/kitchen/classroom building3,000,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $500,000)

(vi) Mayview State Hospital
(A) Upgrade the primary electrical system, including all central feeder circuits3,000,000

(Base Project Allocation - $2,500,000)

(Design and Contingencies - $500,000)

(vi.1) New Castle Youth Development Center
(A) Upgrade HVAC system to reduce extreme heat and humidity for residents990,000
(Base Project Allocation - $825,000)
(Design and Contingencies - $165,000)
(vii) Norristown State Hospital
(A) Renovate the boiler plant for building 60, Phase 3 of DGS project 509-29, reconstruction or replacement of boilers to meet emissions requirements and upgrade the steam distribution system1,800,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $300,000)

(viii) Polk Center
(A) Replace valves, backwash pump and replenish filters with new media in order to keep water plant in compliance with regulations1,400,000

(Base Project Allocation - $1,120,000)

(Design and Contingencies - $280,000)

(ix) Selinsgrove Center
(A) Upgrade the boiler controls for the facility600,000
(Base Project Allocation - $500,000) (Design and Contingencies - $100,000)
(B) Purchase and install package boiler for more efficient handling of summer steam load960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(x) South Mountain Restoration Center
(A) Purchase and install package boiler for more efficient handling of summer steam load840,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $140,000)
(xi) Torrance State Hospital
(A) Bore two horizontal wells into a mountainside to expand and improve freshwater collection720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(B) Upgrade existing coal-fired boiler in order to comply with emission guidelines and enhance coal boilers with natural gas6,600,000

(Base Project Allocation - $5,500,000)

(Design and Contingencies - $1,100,000)

(xii) Wernersville State Hospital
(A) Upgrade coal boiler refractory and structural components360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(B) Renovate patient bathrooms, including piping fixtures to comply with ADA accommodations600,000

(Base Project Allocation - $500,000)

(Design and Contingencies - $100,000)

(xiii) White Haven Center
(A) Replace the heating systems in residential buildings from existing old radiant heat to more modern, digitally controlled, high-efficiency HVAC systems2,400,000

(Base Project Allocation - $2,000,000)

(Design and Contingencies - $400,000)

(10.1) Pennsylvania Emergency Management Agency
(i) Dauphin County
(A) Construction, land acquisition, infrastructure development and other related costs for office space50,000,000
(ii) Lebanon County
(A) Construction, land acquisition, infrastructure development and other related costs for office space50,000,000
(ii.1) Mifflin County
(A) Design and purchase new state-of-the-art equipment for the State Fire Training Academy to replace current outdated apparatus and fixtures2,000,000

(Base Project Allocation - $1,600,000)

(Design and Contingencies - $400,000)

(B) Design and construct thermal lining in the areas of the burn facility that were not finished in the original project to extend the useful life of the building1,500,000

(Base Project Allocation - $1,200,000)

(Design and Contingencies - $300,000)

(iii) Pennsylvania State Firefighters' Memorial
(A) Acquisition, infrastructure, construction and other related costs for construction of a State Firefighters Memorial at a location to be determined by the State Fire Commissioner500,000
(11) Pennsylvania State Police
(i) Dunmore Headquarters, Lackawanna County
(A) Construct a new headquarters facility, garage and hangar to replace existing facilities in Lackawanna County10,800,000

(Base Project Allocation - $9,000,000)

(Design and Contingencies - $1,800,000)

(ii) Philadelphia Headquarters, Philadelphia
(A) Renovation and expansion of Philadelphia Headquarters, including land acquisition and construction26,000,000
(12) State System of Higher Education
(i) Bloomsburg University of Pennsylvania
(A) Additional funding for the renovation of the Nelson Field House while providing additional athletic and office space1,000,000
(B) Additional funds for renovation of the Waller Administration Building6,000,000
(ii) Cheyney University of Pennsylvania
(A) Additional funding to replace Browne Hall, including upgrading infrastructure according to modern codes and fire safety code requirements1,000,000
(B) Additional funds for renovation of Carver Science Building6,000,000
(C) Funding for ADA modifications8,000,000
(D) Wastewater treatment plant upgrades10,000,000
(E) Additional funds for the construction of new student housing25,000,000
(F) Additional funds for DGS project 403-72, utility and infrastructure renovations3,500,000
(G) Additional funds for DGS project 403-66, renovations to Biddle Hall400,000
(H) Additional funds for DGS project 403-76, renovations to Humphreys Hall5,000,000
(iii) California University of Pennsylvania
(A) Construction and other related costs to upgrade university stadium facilities350,000
(B) High-voltage upgrades4,000,000
(C) Renovation of Keystone Hall13,000,000
(D) Additional funds for pedestrian and vehicular enhancements, Phase I2,000,000
(iv) East Stroudsburg University of Pennsylvania
(A) Additional funding for the replacement of Rosenkrans Hall, providing additional classroom, laboratory and office space9,000,000
(B) Construction and other costs related to the East Stroudsburg University Conference Center2,000,000
(C) Construction and other related costs to build a parking deck to serve East Stroudsburg University and Pocono Medical Center3,500,000
(D) Additional funds for addition and renovation of Eiler-Martin Stadium5,000,000
(E) Renovation of football stadium and press box3,000,000
(F) Expansion and renovation of field house3,000,000
(v) Edinboro University of Pennsylvania
(A) Renovate or replace Ross Hall including infrastructure and exterior surfaces18,000,000
(B) Additional funds for maintenance building replacement8,000,000
(C) Construction of an air-supported, dome-shaped indoor practice and recreation facility3,400,000
(vi) Lock Haven University of Pennsylvania
(A) Construction and other costs associated with building a new indoor athletic facility at the Lock Haven University Clearfield campus10,000,000
(vii) Clarion University of Pennsylvania
(A) Additional funds for modification of facilities for ADA compliance3,000,000
(B) Additional funds for addition and renovation of Marwick Boyd Fine Arts Center12,000,000
(C) Renovation and expansion of Tippin Gymnasium40,000,000
(viii) Indiana University of Pennsylvania
(A) Additional funds for renovation of Leonard Hall7,000,000
(B) Renovation of Stabley Library7,000,000
(C) Construction, redevelopment and other costs related to improvements to athletic facilities5,000,000
(ix) Kutztown University of Pennsylvania
(A) Replacement of south bleachers in the football stadium1,000,000
(B) Additional funds for upgrade of Keystone Hall16,000,000
(C) Replacement of Lytle Hall30,000,000
(D) Renovations and construction of the Poplar House to house the Institute for Children's Health3,500,000
(E) Installation of a camera security system2,000,000
(F) Demolish, replace and relocate the educational building to address enrollment growth30,000,000

(Base Project Allocation - $24,000,000)

(Design and Contingencies - $6,000,000)

(x) Mansfield University of Pennsylvania
(A) Water treatment plant upgrades6,000,000
(xi) Millersville University of Pennsylvania
(A) Renovation of Byerly Hall6,000,000
(B) Renovation of Stayer Building7,000,000
(xii) Shippensburg University of Pennsylvania
(A) Additional funding for steam distribution system renovation10,000,000
(B) Redevelopment, including construction, infrastructure and acquisition, of the Hoffman Mills building2,500,000
(C) Construction and related infrastructure to upgrade Shippensburg University Athletic Complex5,000,000
(D) Replacement of heating and cooling water line20,000,000
(E) Construction of a cooling and hot water plant30,000,000
(xiii) Slippery Rock University of Pennsylvania
(A) Additional funds for renovation of Morrow Field House16,000,000
(xiv) West Chester University of Pennsylvania
(A) Phase I of campus geothermal utility conversion10,000,000
(B) Renovation of McCarthy Hall20,000,000
(C) Acquisition, infrastructure improvements and construction of Undergraduate Business Center15,000,000
(13) Department of Transportation
(i) Armstrong County
(A) Construct or acquire new Armstrong County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(i.1) Beaver County
(A) Construct or acquire new Beaver County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(i.2) Berks County
(A) Construct or acquire new Berks County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(i.3) Carbon County
(A) Construct or acquire new Carbon County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(i.4) Centre County
(A) Construct or acquire new Centre County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(i.5) Clearfield County
(A) Construct or acquire new Clearfield County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(B) Replace or rehabilitate District 2-0 Office, including an addition on current site and infrastructure improvements12,000,000

(Base Project Allocation - $10,000,000)

(Design and Contingencies - $2,000,000)

(i.6) Crawford County
(A) Construct or acquire new Crawford County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(ii) Dauphin County
(A) Construct or acquire a new county maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(B) Construct or acquire a new PennDOT driver and motor vehicle central office/service center, including design, site acquisition and construction58,000,000

(Base Project Allocation - $50,000,000)

(Land Allocation - $3,000,000)

(Design and Contingencies - $5,000,000)

(C) Provide for the required electrical renovations to obtain a Tier 3 level designation, including system redundancy (i.e., switchgear, etc.) and/or stand-alone transformers at the Dauphin County Server Farm2,000,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $500,000)

(D) Construct new Dauphin County Statewide Traffic Management Center facility, including buildings, site acquisition and development5,000,000

(Base Project Allocation - $4,000,000)

(Land Allocation - $500,000)

(Design and Contingencies - $500,000)

(E) Construct new storage pre-engineered steel building, including development at the Dauphin County sign shop facility1,500,000

(Base Project Allocation - $1,250,000)

(Design and Contingencies - $250,000)

(ii.1) Franklin County
(A) Construct or acquire new Franklin County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(ii.2) Lawrence County
(A) Renovate and expand site 16 safety rest area in Lawrence County, including storage, parking and development2,000,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $200,000)

(B) Renovate and expand Site 15 safety rest area in Lawrence County, including storage, parking and development2,000,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $200,000)

(ii.3) Lycoming County
(A) Construct or acquire new Lycoming County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(ii.4) McKean County
(A) Acquisition and infrastructure related to the construction of the Route 219 Visitor/Discovery Center8,200,000
(iii) Mifflin County
(A) Construct or acquire a new county maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(iii.1) Perry County
(A) Construct or acquire new Perry County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(iii.2) Philadelphia County
(A) Construct or acquire new Philadelphia County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(xvi) Gouldsboro State Park
(B) Avenue of the Arts, North Broad streetscape improvements20,000,000
(iii.3) Potter County
(A) Construct or acquire new Potter County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(iii.4) Wayne County
(A) Construct or acquire new Wayne County maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(iv) Wyoming County
(A) Construct or acquire a new county maintenance facility, including salt and equipment storage buildings and site development13,800,000

(Base Project Allocation - $11,000,000)

(Land Allocation - $1,000,000)

(Design and Contingencies - $1,800,000)

(v) York County
(A) Renovate and expand existing York County Welcome Center and rest area, including parking, restrooms, display areas, tourism services, picnic areas and building compliances to modern codes5,000,000

(Base Project Allocation - $4,500,000)

(Design and Contingencies - $500,000)

(14) Philadelphia Regional Port Authority
(i) Philadelphia County
(A) Acquisition and development of dredge material disposal sites300,000,000
(B) General improvements to port facilities200,000,000

Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.

Section 4. Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Office of Administration
(i) Statewide mobile radio and microwave system
(A) Additional funds for original furniture and equipment to make the Statewide radio and microwave system DGS project 950-10 operational21,000,000
(2) Department of Conservation and Natural Resources
(i) Benjamin Rush State Park
(A) Original furniture and equipment for current capital projects217,000
(ii) Cook Forest State Park
(A) Original furniture and equipment for current capital projects114,000
(iii) Delaware Canal State Park
(A) Original furniture and equipment for current capital projects200,000
(iv) Kinzua Bridge State Park
(A) Original furniture and equipment for current capital projects3,000,000
(v) Nescopeck State Park
(A) Original furniture and equipment for current capital projects150,000
(vi) Pine Grove Furnace State Park
(A) Original furniture and equipment for current capital projects200,000
(vii) Presque Isle State Park
(A) Original furniture and equipment for current capital projects400,000
(viii) Sinnemahoning State Park
(A) Original furniture and equipment for current capital projects2,000,000
(3) Department of Corrections
(i) (Reserved)
(ii) State Correctional Institution at Graterford
(A) Original furniture and equipment for the new institution at SCI Graterford6,500,000
(iii) State Correctional Institution at Huntingdon
(A) Original furniture and equipment for the new institution at SCI Huntingdon6,500,000
(iv) State Correctional Institution at Rockview
(A) Original furniture and equipment for the new institution6,500,000
(v) New State Correctional Institution in Luzerne County
(A) Original furniture and equipment for the new institution within a five-mile radius of SCI Retreat6,500,000
(vi) New State Correctional Institution in Fayette County
(A) Original furniture and equipment for new institution6,500,000
(vii) New State Correctional Institution in Northumberland County
(A) Original furniture and equipment for the new institution6,500,000
(4) Department of Education
(i) Scranton School for the Deaf
(A) Movable furniture and equipment to allow modernization of classrooms and other buildings to meet current standards2,625,000
(B) Original furniture and equipment for the broadcast and deaf services building expansion1,035,000
(ii) Lincoln University
(A) Movable furniture and equipment to allow construction project at Wright Hall to become operational3,000,000
(B) Movable furniture and equipment at Langston Hughes Library for use for the completely renovated facility4,000,000
(C) Furniture and equipment for Grim Hall renovations, DGS Project No. 1101-392,000,000
(D) Furniture and equipment for Academic Student Center, DGS Project No. 1101-475,000,000
(E) Original furniture and equipment for the John Miller Dickey Hall4,000,000

(Base Project Allocation - $3,200,000)

(Design and Contingencies - $800,000)

(iii) The Pennsylvania State University
(A) Labs and original furnishings for the chemical engineering building8,600,000
(B) Altoona campus, engineering building lab equipment4,500,000
(C) Dubois campus, engineering building lab equipment4,500,000
(D) University Park, engineering building lab equipment10,000,000
(E) University Park, original equipment for a newly constructed applied research lab building10,000,000
(4.1) Department of General Services
(i) Capital East Wing Office Building
(A) Purchases of furniture and equipment for the East Wing4,500,000
(ii) Irvis Office Building
(A) Purchases of furniture and equipment for the Irvis Office Building5,000,000
(5) Pennsylvania Historical and Museum Commission
(i) Eckley Miners' Village
(A) Replacement of original furniture and equipment associated with the visiting public1,920,000
(i.1) Ephrata Cloister
(A) Original furniture and equipment for the newly renovated visitors center, including high-density storage system600,000
(ii) Graeme Park
(A) Original furniture and equipment associated with the new orientation exhibit720,000
(iii) Landis Valley Museum
(A) Construct new museum exhibits for the expanded visitors center building and other buildings1,800,000
(iv) State Records Center
(A) Original furniture and equipment, including a mobile high density storage system1,800,000
(5.1) Pennsylvania Emergency Management Agency
(i) Dauphin County
(A) Original furniture and equipment for new office space construction10,000,000
(ii) Lebanon County
(A) Original furniture and equipment for new office space construction10,000,000
(5.2) Pennsylvania State Police
(i) Philadelphia
(A) Original furniture and equipment for the expansion of Philadelphia Headquarters2,000,000
(6) State System of Higher Education
(i) Bloomsburg University of Pennsylvania
(A) Additional funding for original furniture and equipment for Sutliff Hall addition500,000
(ii) East Stroudsburg University of Pennsylvania
(A) Additional funding for original furniture and equipment for Rosenkrans Hall1,000,000
(iii) Kutztown University of Pennsylvania
(A) Supplemental funding for the purchase of movable furniture and equipment to allow Schaffer Auditorium construction project to become operational500,000
(B) Furniture, fixtures and equipment for the Sharadine Art Building1,900,000
(iv) (Reserved)
(v) Lock Haven University of Pennsylvania
(A) Costs associated with furniture and equipment for a new indoor athletic facility at the Lock Haven University Clearfield campus1,000,000
(B) Additional funding for original furniture and equipment for the old KCSD High School renovation project1,500,000
(C) Additional funds for original furniture and equipment for Science and Math Center1,500,000
(vi) Millersville University of Pennsylvania
(A) Supplemental funding for the purchase of movable furniture and equipment to allow Theatre Arts Education Building construction project to become operational200,000
(vii) Shippensburg University of Pennsylvania
(A) Supplemental funding for the purchase of movable furniture and equipment to allow Huber Arts Center construction project to become operational500,000
(viii) Slippery Rock University of Pennsylvania
(A) Supplemental funding for the purchase of movable furniture and equipment to allow Performing Arts Center construction project to become operational1,000,000

Section 5. Itemization of transportation assistance projects.

(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Area Transportation Authority
(i) Purchase six accessible less-than-30-foot replacement buses and one accessible replacement van112,000

(Base Project Allocation - $101,000)

(Design and Contingencies - $11,000)

(ii) Provide for continuation of the ITS project, including the automatic vehicle locator and video surveillance systems239,000

(Base Project Allocation - $215,000)

(Design and Contingencies - $24,000)

(iii) Construct St. Mary's and Punxsutawney passenger terminals628,000

(Base Project Allocation - $565,000)

(Design and Contingencies - $63,000)

(1.1) Beaver County Transit Authority
(i) Provide for improvements in bus circulation, passenger waiting and terminal areas at the Rochester Transportation Center (RTC), pedestrian improvements with the Transit Revitalization Investment District (TRID) area and from the RTC to the Rochester riverfront development and signal preemption/prioritization request system in the TRID area317,000

(Base Project Allocation - $285,000)

(Design and Contingencies - $32,000)

(2) Berks Area Reading Transit Authority
(i) Purchase and install an auto vehicle locator system for both fixed route and paratransit systems167,000

(Base Project Allocation - $150,000)

(Design and Contingencies - $17,000)

(2.1) Bucks County Transportation Management Association
(i) Costs related to Phase II of the Quakertown-Stoney Creek Passenger Rail Restoration Project5,000,000
(3) Cambria County Transit Authority
(i) Replace bus wash system, upgrade communication system and purchase security surveillance system100,000

(Base Project Allocation - $90,000)

(Design and Contingencies - $10,000)

(ii) Construct rural transfer center to increase service efficiency, attract new riders and provide easier transfers for riders100,000

(Base Project Allocation - $90,000)

(Design and Contingencies - $10,000)

(iii) Replace six buses which have met their useful life342,000

(Base Project Allocation - $308,000)

(Design and Contingencies - $34,000)

(4) Capital Area Transit
(i) Improve and renovate CAT's maintenance building to include three bays to repair and service 40-foot low floor buses233,000

(Base Project Allocation - $210,000)

(Design and Contingencies - $23,000)

(5) Centre Area Transportation Authority
(i) Purchase 16 buses to replace buses which have met their useful life167,000

(Base Project Allocation - $150,000)

(Design and Contingencies - $17,000)

(ii) Purchase automatic vehicle locator system with the first phase to equip buses and service vehicles with such items as the automatic enunciators, electronic performance monitoring, stop-by-stop passenger counts, real time passenger information via the Internet and at major stops156,000

(Base Project Allocation - $140,000)

(Design and Contingencies - $16,000)

(iii) Park and ride facility2,500,000
(iv) Replace CNG compressors at the fueling station which have met their useful life26,000

(Base Project Allocation - $23,000)

(Design and Contingencies - $3,000)

(v) Purchase 11 CNG transit buses to replace existing buses which have met their useful life580,000

(Base Project Allocation - $522,000)

(Design and Contingencies - $58,000)

(6) Crawford Area Transportation Authority
(i) Construct administrative intermodal center in downtown Meadville and purchase bus related equipment333,000

(Base Project Allocation - $300,000)

(Design and Contingencies - $33,000)

(ii) Purchase up to six new accessible fixed-route buses216,000

(Base Project Allocation - $194,000)

(Design and Contingencies - $22,000)

(6.1) Elizabethtown Intermodal Transportation Center
(i) Construction of a high-level platform and elevators at existing Elizabethtown train station2,000,000

(Base Project Allocation - $2,000,000)

(ii) Construction of a new parking garage adjacent to Intermodal Transportation Center4,000,000

(Base Project Allocation - $4,000,000)

(6.2) Elk County Area Transportation Authority
(i) Construction of the Depot Street intermodal transportation facility and parking deck in the City of St. Mary's1,500,000
(7) Erie Metropolitan Transit Authority
(i) Acquire five buses to replace five existing buses which have exceeded their useful life379,000

(Base Project Allocation - $341,000)

(Design and Contingencies - $38,000)

(ii) Renovate administration/maintenance facility and purchase shop and miscellaneous equipment39,000

(Base Project Allocation - $35,000)

(Design and Contingencies - $4,000)

(iii) Purchase technology upgrades to radio and fare box systems and complete systemwide signage33,000

(Base Project Allocation - $30,000)

(Design and Contingencies - $3,000)

(iv) Acquire automated vehicle locator system290,000

(Base Project Allocation - $261,000)

(Design and Contingencies - $29,000)

(v) Provide for bus replacement, facility rehabilitation and related equipment540,000

(Base Project Allocation - $486,000)

(Design and Contingencies - $54,000)

(vi) Construct new transit facility, which will be a combined administration maintenance building for the fixed-route and paratransit divisions967,000

(Base Project Allocation - $870,000)

(Design and Contingencies - $97,000)

(7.1) Fayette County
(i) Replace 30-foot bus and related equipment124,000

(Base Project Allocation - $112,000)

(Design and Contingencies - $12,000)

(7.2) Indiana County Transit Authority
(i) Renovation and expansion of bus garage project260,000

(Base Project Allocation - $260,000)

(7.3) Lehigh and Northampton Transportation Authority
(i) Purchase five heavy duty transit buses for expanded fixed-route public transportation services290,000

(Base Project Allocation - $261,000)

(Design and Contingencies - $29,000)

(ii) Replace 20 paratransit service small transit buses which have met their useful life240,000

(Base Project Allocation - $216,000)

(Design and Contingencies - $24,000)

(7.4) Port Authority of Allegheny County
(i) FY 2009-2010 Federal Flex Funds (STP and/or CMAQ)2,000,000
(ii) FY 2009-2010 section 5309 fixed guideway modernization5,000,000
(iii) FY 2009-2010 East-West Corridor Rapid Transit5,000,000
(iv) FY 2009-2010 Infrastructure Safety Renewal Program (ISRP)17,000,000
(v) FY 2009-2010 vehicle overhaul4,000,000
(vi) FY 2009-2010 section 5307 Formula Program7,000,000
(vii) Completion of linear park in Edgewood Borough adjacent to East Busway facility7,200,000
(viii) Construction and infrastructure-related costs for the Robinson Intermodal Facility4,000,000
(ix) Provide for a smart card-based fare collection system that can be utilized by all regional transit operators that elect to participate in the project utilizing common infrastructure for better coordination of regional services9,472,000

(Base Project Allocation - $8,525,000)

(Design and Contingencies - $947,000)

(7.5) Luzerne County
(i) Acquisition, construction, infrastructure and other related costs for an intermodal transportation facility in City of Wilkes-Barre4,000,000
(7.6) Montgomery County
(i) Construction and renovations for Jenkintown intermodal facility to include parking and transit access2,000,000
(7.7) Mount Joy AMTRAK Station
(i) Infrastructure, construction and other related costs for the renovations and upgrades to facilities, including ADA-related improvements and the construction of a platform for freight and passenger use1,900,000
(7.8) Pottstown Urban Transit
(i) Replace existing buses which have met their useful life657,000

(Base Project Allocation - $591,000)

(Design and Contingencies - $66,000)

(8) Red Rose Transit Authority
(i) Replace bus washer and renovation and expand bus storage building375,000

(Base Project Allocation - $337,000)

(Design and Contingencies - $38,000)

(ii) Design and construct new station on AMTRAK Harrisburg to Philadelphia line in Paradise Township, Lancaster County200,000

(Base Project Allocation - $180,000)

(Design and Contingencies - $20,000)

(iii) Renovate and expand operations center bus storage building, maintenance garage and administration office967,000

(Base Project Allocation - $870,000)

(Design and Contingencies - $97,000)

(iv) Provide for fare collection and support equipment (bus washer) purchase and replacement program242,000

(Base Project Allocation - $218,000)

(Design and Contingencies - $24,000)

(9) Shenango Valley Shuttle Service
(i) Construct a maintenance facility including equipment and land acquisition250,000

(Base Project Allocation - $225,000)

(Design and Contingencies - $25,000)

(10) Southeastern Pennsylvania Transportation Authority
(i) Provide for the rehabilitation of improvements at Croyden and Levittown Stations located in Bucks County with improvements to include the installation of bus shelters and transit signage, station improvements, bus access improvements at both stations and parking expansion3,500,000

(Base Project Allocation - $3,150,000)

(Design and Contingencies - $350,000)

(ii) Provide for the rehabilitation of improvements to bus and rail intermodal connections at the Glenside and Jenkintown Stations in Montgomery County with improvements to include design and construction of a multilevel 384-space parking garage at Glenside Station and a multilevel 700-space parking garage at Jenkintown Station6,700,000

(Base Project Allocation - $6,030,000)

(Design and Contingencies - $670,000)

(iii) FFY 2008 Transit Enhancement Program, provide for renovation and preservation of historic train stations and related activities, including bus shelters, landscaping, street lights, pedestrian access and walkways, bicycle access, signage and enhanced access to transit for persons with disabilities670,000

(Base Project Allocation - $603,000)

(Design and Contingencies - $67,000)

(iv) Provide for construction of a multilevel parking structure and pedestrian overpass over AMTRAK tracks, to connect the west side of the campus of Villanova to the main campus, with parking for approximately 1,000 vehicles and be handicapped accessible625,000

(Base Project Allocation - $562,000)

(Design and Contingencies - $63,000)

(v) FFY 2002 Section 5309 Transit Enhancement Program, provide additional funding for the acquisition of 104 new rail cars for SEPTA Regional Rail service2,000,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $200,000)

(vi) FFY 2008 Transit Enhancement Program, provide additional funds for the rehabilitation of the Market Street Elevated Reconstruction Program, including the complete reconstruction of superstructure foundations, abutments and bearings2,320,000

(Base Project Allocation - $2,088,000)

(Design and Contingencies - $232,000)

(vii) FFY 2008 Transit Enhancement Program, provide additional funds for the rehabilitation of the Market Street Elevated Reconstruction Program and the Paoli Transportation Center, including the complete reconstruction of superstructure, foundations, abutments and bearings22,616,000

(Base Project Allocation - $20,354,000)

(Design and Contingencies - $2,262,000)

(viii) FFY 2009 Transit Enhancement Program, provide for the bus purchase program, fare collection system upgrade, Market Street Elevated Reconstruction, Smart Stations, state of good repair program, station accessibility, systems improvement program and utility fleet renewal15,077,000

(Base Project Allocation - $13,569,000)

(Design and Contingencies - $1,508,000)

(ix) Upgrade Silverliner propulsion system and improve the Silverliner IV fleet, including door control relay panel, blending valve and HVAC control upgrade684,000

(Base Project Allocation - $616,000)

(Design and Contingencies - $68,000)

(x) FFY 2009 Federal Highway Flex Projects, provide for the Exton Station parking expansion, upgrading of warning devices at various railroad/high grade crossings and the construction of the Villanova Intermodal Transportation Center967,000

(Base Project Allocation - $870,000)

(Design and Contingencies - $97,000)

(xi) FFY 2009 Transit Bus Purchase Program, acquire 400 accessible 40-foot low floor buses, including a pricing option for diesel-electric hybrid buses replacing those which have met their useful life4,175,000

(Base Project Allocation - $3,757,000)

(Design and Contingencies - $418,000)

(xii) Vehicle Overhaul Program, provide for SEPTA's Fiscal Year 2008-2009 Vehicle Overhaul Program, which provides for the major overhaul of SEPTA's rolling stock45,435,000

(Base Project Allocation - $40,891,000)

(Design and Contingencies - $4,544,000)

(xii) Vehicle Overhaul Program, provide for SEPTA's Fiscal Year 2008-2009 Vehicle Overhaul Program, which provides for the major overhaul of SEPTA's rolling stock45,435,000
(xiii) Infrastructure Safety Renewal Program, provide for SEPTA's Fiscal Year 2008-2009 Infrastructure Safety Renewal Program, which includes improvements to stations, signals, track, power and buildings31,901,000

(Base Project Allocation - $28,711,000)

(Design and Contingencies - $3,190,000)

(11) Union and Snyder Transit Authority
(i) Construct maintenance facility, including equipment and land acquisition304,000

(Base Project Allocation - $273,000)

(Design and Contingencies - $31,000)

(ii) Additional funds to construct a vehicle storage and maintenance facility and purchase shop equipment191,000

(Base Project Allocation - $172,000)

(Design and Contingencies - $19,000)

(12) Department of Transportation
(i) Provide for rail passenger improvements across this Commonwealth, including matching funds for the Keystone Corridor Federal funding15,000,000

(Base Project Allocation - $13,500,000)

(Design and Contingencies - $1,500,000)

(ii) Provide for Intercity Bus Capital Assistance Intermodal Projects and ADA related facilities/equipment improvements2,000,000

(Base Project Allocation - $1,800,000)

(Design and Contingencies - $200,000)

(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Allegheny County
(i) US Steel Mon Valley Transportation Assistance project, including rehabilitation and replacement of rail infrastructure to maintain capacity and operating capability, reconstruction of culverts and ditches on property and enhancement of tracks to accommodate heavier cars10,000,000
(ii) Development and utilization of high-performance precision manufacturing technology for deployment of the Pennsylvania High-Speed Maglev System across Pennsylvania, with stops, including, but not limited to, Greater Pittsburgh International Airport, Pittsburgh, Monroeville, Westmoreland County, Johnstown, Altoona, State College, Lewistown, Harrisburg, Lancaster, Delaware County and Philadelphia and for use in bridge and elevated highway structures, including structural beams such as I-beams and tub girders and other metal-fabricated infrastructure components for transportation systems45,000,000
(1.1) Armstrong County
(i) Reconstruction of an eight-mile spur of railroad in Bethel Township5,000,000
(1.2) Allegheny Valley Railroad
(i) P&W Subdivision Phase II railroad infrastructure rehabilitation and capacity improvements, including track, roadbed, bridges and grade crossings from MP 322 to MP 326 and from MP 1 to MP 31 in Allegheny and Butler Counties2,860,000

(Base Project Allocation - $2,600,000)

(Design and Contingencies - $260,000)

(ii) W&P Subdivision Phase II railroad infrastructure rehabilitation and capacity improvements, including track, roadbed, bridges and grade crossings from MP 4 to MP 39 in Allegheny and Washington Counties2,530,000

(Base Project Allocation - $2,300,000)

(Design and Contingencies - $230,000)

(iii) Glenwood Yard new and rebuilt yard tracks, capacity improvements, safety improvements and rail infrastructure rehabilitation, including track, roadbed, bridges and grade crossings in Allegheny County4,840,000

(Base Project Allocation - $4,400,000)

(Design and Contingencies - $440,000)

(iv) Construction, infrastructure and other related costs for rehabilitation and replacement of rail infrastructure for the U.S. Steel Mon Valley Works facilities10,000,000
(1.3) Beaver County
(i) Construction, infrastructure and other related costs for Aliquippa Ethanol, LLC, facility6,000,000
(2) Buffalo and Pittsburgh Railroad
(i) Rehabilitate mainline track in Armstrong, Clearfield, Indiana and Jefferson Counties, from Kittanning to Dubois and Punxsutawney to Homer City with work to include tie and rail replacement, surfacing, bridge repair, switch, road crossing, signal, communication and any other related work5,000,000
(2.1) Altoona Blair County Development Corporation
(i) Rehabilitation of the Bedford Secondary Line in Blair County from Hollidaysburg to the Walter Business Park, including engineering design, construction and improvement upgrades2,000,000
(2.2) Bucks County Transportation Management Association
(i) Rehabilitation and improvements along the Bethlehem Branch from Lansdale to Bucks/Lehigh County border, including property acquisition, engineering and infrastructure stabilization12,000,000
(3) Cambria, Clearfield and Indiana Counties
(i) Construction, infrastructure and other related costs for the Clearfield Cluster3,000,000
(3.1) Centre County
(i) Construction and other costs related to the SEDA Welded Rail Project Phase IV - Sayers Dam in Liberty Howard Boggs Township800,000
(3.2) Clinton County
(i) Improvement to railcar facility at Renovo Industrial Park to enhance production, including utility improvements, rail improvements and building renovation and improvements3,000,000
(3.3) Delaware and Hudson Railway Company
(i) Reconstruct rail infrastructure in Susquehanna County to provide service to rail and truck transfer facility and distribution center3,575,000

(Base Project Allocation - $3,250,000)

(Design and Contingencies - $325,000)

(ii) Maintain and construct rail sidings to facilitate increasing freight volumes and improve system capacity from Port of Philadelphia to New York State8,800,000

(Base Project Allocation - $8,000,000)

(Design and Contingencies - $800,000)

(iii) Rehabilitate Honey Pot Yard rail infrastructure in Luzerne County to serve customers within industrial park3,300,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $300,000)

(iv) Upgrade and install signal and communications systems on Delaware and Hudson Railway5,225,000

(Base Project Allocation - $4,750,000)

(Design and Contingencies - $475,000)

(v) Development of a bulk terminal/transload facility in Susquehanna County, including land acquisition, site preparation, grading, rail, ties, ballast, signals, customer sidings, crossings and other related materials5,000,000
(3.4) Erie County
(i) Infrastructure, construction and other related costs for rail expansion at the former International Paper site consisting of construction of two rail bridges and new rail construction5,000,000
(ii) Construction and rail expansion at Mountfort Terminal750,000
(3.5) Kiski Junction Railroad
(i) Construction of nine-mile extension north along eastern shore of Allegheny River from Schenley to Crooked Creek on former Conrail railbed5,400,000
(3.6) Lackawanna County
(i) Pennsylvania Northeast Regional Railroad Authority
(A) Purchase and installation of materials necessary for the trackage and spurs to provide rail access and infrastructure to the new ethanol production facility in Mayfield and Carbondale2,200,000
(B) Purchase and install materials necessary for the upgrading, rebuilding and rehabilitation of the 18-mile Carbondale mainline between Moosic and Carbondale1,825,000
(3.7) Tri-State Biofuels
(i) Upgrade and expand rail access to alternative energy development site near Uniontown for Tri-State Biofuels site, including new rail spur, switches and other rail infrastructure materials1,650,000

(Base Project Allocation - $1,500,000)

(Design and Contingencies - $150,000)

(4) Lawrence County
(i) Acquisition, construction, infrastructure and other related costs for reconstruction of rail lines in Ellwood Borough10,000,000
(5) Lehigh Valley Rail Management
(i) Construct access and storage tanks and rehabilitate track within and around the Bethlehem Commerce Center3,500,000
(6) Luzerne County
(i) Acquisition, construction, infrastructure and other related costs for Whitney Point rail infrastructure project in Luzerne Township5,000,000
(ii) Center Pointe West rail project400,000
(6.1) Lycoming County
(i) Construction of rail spurs and related track work to provide rail service to industrial sites for the expansion of the Muncy Industrial Park in Muncy and Muncy Creek Townships, Industrial Properties Corporation3,000,000
(6.2) Mercer County
(i) Update rail line and create a rail siding at the Meadville Line of Norfolk and Southern Railway in Sharpsville1,000,000
(6.3) Monroe County
(i) Pennsylvania Northeast Regional Railroad Authority
(A) Acquisition and rehabilitation of 10.6-mile rail track line running from Analomink to the Delaware Water Gap from Norfolk Southern1,500,000
(6.4) Montgomery County
(i) Rehabilitation of Stoney Creek branch from Norristown to Lansdale, including a new side track to Lansdale Warehouse and increased capacity at Lansdale Yard12,000,000
(ii) Infrastructure improvements, rehabilitation and other costs related to the construction of a 250-foot rail spur extension and rail side silo, rebuilding of a rail car unloading system and other renovations at the Custom Processing Services facilities800,000
(6.5) Northampton County
(i) Construction, infrastructure and other related costs for the Forks Business Center rail projects1,000,000
(6.6) Northumberland County
(i) Infrastructure and other related costs to extend rail service to the SEEDCO Industrial Park in Coal Township3,500,000
(ii) Upgrade of rail line, including infrastructure and other related improvements for the provision of rail service for the SunPoint renewable energy project2,000,000
(7) Philadelphia County
(i) Rehabilitation of rail lines and infrastructure improvements10,000,000
(7.1) Pittsburgh and Ohio Central Railroad
(i) Infrastructure improvements in Allegheny County5,225,000
(ii) Infrastructure improvements in Allegheny and Washington Counties4,400,000
(iii) Construction projects in Allegheny, Beaver and Washington Counties10,100,000
(iv) Construction projects in Beaver, Washington and Allegheny Counties11,550,000
(7.2) Reading Blue Mountain and Northern Railroad
(i) Track rehabilitation on Mainline and Branchlines to support increased car weights and increased business in District 4 in Luzerne, Lackawanna, Carbon and Wyoming Counties4,500,000
(ii) Rehabilitation of C&H Branch from Delano Junction to Jeddo Coal facility in Hazleton for new intermodal, dredge, coal and other business in Luzerne County3,200,000
(iii) Rehabilitation of track in Crestwood Industrial Park, including extending and building tracks in Penobscot Yard in Luzerne County2,400,000
(iv) Construction of new runaround, siding and associated switches for a new interchange location in Nesquehoning in Carbon County1,700,000
(v) Purchase of new open top and covered hopper cars12,000,000
(vi) Rehabilitation of railroad bridges, culverts and other infrastructure between White Haven and Scranton in Luzerne County1,000,000
(vii) Construction of runaround and extension of track in the Scranton area2,000,000
(viii) Construction, infrastructure and other related costs for the Nesquehoning Bridge Project10,000,000
(7.3) Rosebud Mining Railroad Expansion
(i) Extension of Rosebud Mining Railroad line in Bethel Township5,000,000

(Base Project Allocation - $5,000,000)

(7.4) SEDA-COG Joint Rail Authority
(i) Upgrade 11 miles of the main line from Mt. Eagle to Eagleville, Centre County, with continuous welded rail and other track improvements3,300,000
(ii) Construction of a 5,500-foot runaround track along the main line near Milesburg, Centre County1,300,000
(iii) Construct rail spur and related track work to provide rail service to the SEEDCO Industrial Park in Mt. Carmel Township, Northumberland County2,800,000
(7.5) Snyder County
(i) Rail improvements to the Sunbury Generation Station, including track, construction of new rail stackout facilities and rail dumper upgrades, including enclosing the facility6,994,000
(7.6) Stourbridge Railroad Company
(i) Infrastructure, construction and rehabilitation of 23 miles of railroad line, including track, ties, rail, ballast and switches between Honesdale, Wayne County, and Lackawaxen, Pike County, including the construction of a connecting railroad spur and auxiliary railroad infrastructure into an industrial complex in Wayne County9,000,000
(7.7) Washington County
(i) Penn Ridge Coal Company, LLC, construct new siding and loading facility for new coal mine complex near Avella, including surface preparations, rails, ties and other related rail infrastructure5,500,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $500,000)

(7.8) Western New York and Pennsylvania Railroad, LLC
(i) Upgrade signals on the Buffalo Main Line from State line to Driftwood in McKean and Cameron Counties, including planning, engineering and contingencies200,000
(ii) Rehabilitation of the Buffalo Main Line from State line to Driftwood in McKean and Cameron Counties, including the replacement of crossties and track surfacing500,000
(iii) Rehabilitation of the Oil City Branch from Meadville to Rouseville in Crawford, Mercer and Venango Counties, including the replacement of crossties, track surfacing, planning and contingencies1,667,000
(iv) Rehabilitation of the Meadville-Hornell Main Line from Meadville to State line in Crawford, Erie and Warren Counties, including cropping and welding of rail, ties and surfacing6,667,000
(v) Rehabilitation of the Farmers Valley Branch from Eldred to Farmers Valley in McKean County, including the replacement of crossties, track surfacing, planning and contingencies333,000
(8) Westmoreland County
(i) Construction and other related costs for the Norfolk Southern Commuter Rail Project30,000,000
(ii) Development of the Alle-Kiski Commuter Rail Project3,000,000
(iii) Design and construction of rail, turnouts, crossings and bridge work within the Commonwealth renewable energy plant facility in Mount Pleasant4,500,000
(9) Westmoreland County Industrial Development Corporation
(i) Mount Pleasant Subdivision rail infrastructure rehabilitation and capacity improvements, including track, roadbed, bridges and grade crossings from MP 0 to MP 15 in Westmoreland and Fayette Counties2,860,000

(Base Project Allocation - $2,600,000)

(Design and Contingencies - $260,000)

(ii) Radebaugh Subdivision rail infrastructure rehabilitation and capacity improvements, including track, roadbed, bridges and grade crossings from MP 0 to MP 18 in Westmoreland County2,640,000

(Base Project Allocation - $2,400,000)

(Design and Contingencies - $240,000)

(iii) Development of new yard track structure and rail infrastructure rehabilitation and capacity improvements, including track, roadbed, bridges and grade crossings within Westmoreland Rail Freight Terminal in Westmoreland County1,540,000

(Base Project Allocation - $1,400,000)

(Design and Contingencies - $140,000)

(10) Wheeling and Lake Erie Railway
(i) Rehabilitate segments of the main line, including rails, ties, ballast, grading, switches, crossings and bridges in Allegheny and Washington Counties10,100,000
(ii) Rehabilitate ties, ballast, rails, crossings, bridges and switches in Fayette and Westmoreland Counties10,100,000
(iii) Construct and rehabilitate new and existing customer sidings in Allegheny, Washington, Fayette and Westmoreland Counties, including switches, signals, rails, ties, ballast and other related materials7,700,000
(iv) Upgrade bridges and tunnels in Westmoreland, Fayette, Washington and Allegheny Counties22,000,000

(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Allegheny County
(i) Allegheny County Airport Authority
(A) Upgrade to Allegheny County Airport terminal and surrounding runways in West Mifflin Borough5,000,000
(B) Site and infrastructure improvements1,000,000
(1.1) Bucks County
(i) Quakertown Airport
(A) Design, site work, infrastructure and construction of a new fuel system400,000
(1.2) Clearfield County
(i) Clearfield-Lawrence Township Airport
(A) Construction, infrastructure and other related costs for airport improvements1,500,000
(1.3) Clinton County
(i) William T. Piper Memorial Airport
(A) Construction, redevelopment and other costs related to hangar renovations and other airport improvements500,000
(1.4) Dauphin County
(i) Harrisburg International Airport
(A) Provide airport improvements for the economic development and safety enhancement at the airport5,000,000

(Base Project Allocation - $4,000,000)

(Design and Contingencies - $1,000,000)

(2) Erie County
(i) Erie International Airport
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for the Erie International Airport runway extension10,000,000
(2.1) Indiana County
(i) Jimmy Stewart Airport
(A) Acquisition, related infrastructure and construction of an access road and hangars at the Jimmy Stewart Airport2,000,000

(Base Project Allocation - $2,000,000)

(2.2) Lancaster County
(i) Lancaster Airport Authority
(A) Site development and construction of T-hangar and offices1,000,000
(B) Site development and construction of corporate hangar and offices2,000,000
(C) Design, site work and construction to rehabilitate T/W's Foxtrot and Mike2,000,000
(3) Lehigh County
(i) Lehigh Valley International Airport
(A) Provide for the economic development and safety enhancement at the airport5,000,000

(Base Project Allocation - $4,500,000)

(Design and Contingencies - $500,000)

(4) Luzerne County
(i) Hazle Township
(A) Acquisition, construction, infrastructure and other related costs for the development of a cargo airport250,000,000
(4.1) Lycoming County
(i) Williamsport Regional Airport
(A) Construction of a fuel farm and runway apron500,000
(4.2) Monroe County
(i) Pocono Mountains Municipal Airport
(A) Runway expansion at the Pocono Mountains Municipal Airport1,000,000

(Base Project Allocation - $1,000,000)

(4.3) Montgomery County
(i) Pottstown Municipal Airport
(A) Engineering, planning, construction and other related costs for the construction of 40 new hangar slots2,500,000
(4.4) Venango County
(i) Venango Regional Airport
(A) Infrastructure and construction of a corporate hangar facility300,000
(5) Washington County
(i) North Franklin Township
(A) Aerial right-of-way for ILS Glidescope500,000
(ii) South Franklin Township
(A) Construction, infrastructure and other related costs for the Washington County Airport infrastructure project1,000,000
(B) Acquisition, construction, infrastructure and other related costs for the Washington County Airport expansion2,000,000

Section 6. Itemization of redevelopment assistance capital projects.

Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors and assigns authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Adams County
(i) County projects
(A) Renovations of the Columbia Gas building to accommodate a homeless shelter in Gettysburg, South Central Community Action programs300,000
(B) Land acquisition, infrastructure and construction of a new emergency services building for the Southeastern Adams Volunteer Emergency Services (SAVES)1,000,000
(ii) Adams County Economic Development Corporation
(A) Acquisition, infrastructure and other related costs, including a target site assessment for a new business park along the U.S. Route 15 corridor10,000,000
(iii) Adams County Historical Society
(A) Renovations, rehabilitation and other related costs for repairs and upgrades, including ADA restrooms and elevator to the historical Schmucker Hall of the Lutheran Theological Seminary at Gettysburg4,000,000
(iv) Carroll Valley Borough
(A) Planning, design and construction of a new Carroll Valley Borough Building800,000
(2) Allegheny County
(i) County projects
(A) Acquisition, construction and other related costs for the Millvale Marina to Sharpsburg recreation project1,000,000
(B) Site preparation, infrastructure and construction related to a lifestyle center/mixed-use development located at the Kirwan Heights Interchange of Interstate 7910,000,000
(C) Infrastructure improvements, construction and other costs related to the Allegheny Together business district revitalization project10,000,000
(D) Construction, infrastructure improvements and other costs related to the Carrie Furnace stabilization and site development project in Swissvale and Rankin15,000,000
(E) Infrastructure, construction and other related costs to form a Regional Center for Excellence in Science and Energy, including the purchase of electrical and mechanical systems within the Pittsburgh Supercomputing Center1,000,000
(F) Infrastructure, site development, construction and other related costs in support of sports-related facilities serving the Baldwin-Whitehall School District1,000,000
(G) Conversion of existing tennis and swimming facility to multiuse activities center1,000,000
(H) Construction, redevelopment and other related costs for the East End Cooperative Community House5,000,000
(I) Construction, infrastructure improvements and other costs related to the Kane redevelopment project for senior developments in the North Hills and the Mon Valley3,000,000
(ii) City of Pittsburgh
(A) Acquisition, construction, infrastructure and other related costs for the Morningside Community Center725,000
(B) Construction and other related costs for Pittsburgh Life Sciences expansion1,000,000
(C) Construction, acquisition, infrastructure, redevelopment and other costs related to the revitalization at Perry South1,500,000
(D) Construction, infrastructure, redevelopment and other costs related to Allegheny General Hospital renovations15,000,000
(E) Construction, acquisition, redevelopment and other costs related to the Center Avenue and Thelma Lovette Family YMCA projects3,500,000
(F) Construction and other related costs for the renovation of the Marian Manor senior health facility550,000
(G) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other costs related to the Strip District project6,000,000
(H) Construction, infrastructure, redevelopment and other costs associated with the Beechview redevelopment project3,000,000
(I) Construction, infrastructure and other related costs for Strip District improvements2,000,000
(J) Construction, infrastructure and other related costs for Strip District infrastructure improvements6,000,000
(K) Construction and other related costs to renovate Family House University Club1,500,000
(L) Construction, redevelopment and other costs associated with renovation and expansion of the Robert Morris University downtown campus5,000,000
(M) Acquisition, construction and other related costs for UPMC St. Margaret expansion15,600,000
(N) Construction, infrastructure and other related costs to restore and expand Deans Athletic Field community park588,000
(O) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other costs related to the development of Lawrenceville10,000,000
(P) Construction and other related costs for Riverview Towers renovations1,800,000
(Q) Construction, infrastructure and related costs for the Grandview Scenic Byway project1,000,000
(R) Construction and other related costs for the Brookline Boulevard project3,900,000
(S) Construction and other related costs for the Homewood Brushton Community Development Corporation Sterret-Collier corridor revitalization5,000,000
(T) Construction and other related costs for Route 51 corridor redevelopment and improvement5,000,000
(U) Construction, infrastructure and other related costs for the National Aviary expansion5,000,000
(V) Construction, infrastructure and other related costs for the Urban League of Greater Pittsburgh Charter School1,500,000
(W) Construction and other related costs for the revitalization of Broadway Avenue7,000,000
(X) Acquisition, construction, infrastructure and other related costs for the Pittsburgh Zoo and PPG Aquarium5,000,000
(Y) Acquisition, construction, infrastructure and other related costs for the University of Pittsburgh Medical Center/University of Pittsburgh Diabetes Institute20,000,000
(Z) Construction of science center, Community College of Allegheny County14,500,000
(AA) Infrastructure improvements, renovations and construction for WQED2,000,000
(BB) Acquisition, renovations and construction of a new facility for the Pittsburgh Opera4,500,000
(CC) Renovations and construction of a low-to moderate-income senior health care facility500,000
(DD) Acquisition, infrastructure improvements and construction of the Wood Street Commons3,000,000
(EE) Expansion, renovation, infrastructure improvements and construction of the Western Pennsylvania Hospital Campus10,000,000
(FF) Acquisition, renovations, infrastructure improvements and construction for the Western Pennsylvania Hospital School of Nursing10,000,000
(GG) Infrastructure improvements and construction of Mercy Hospital Department of Emergency Medicine facility10,000,000
(HH) Construction, infrastructure, redevelopment and other costs related to the Sterling Plaza II project5,000,000
(II) Acquisition, construction, infrastructure and other costs related to the Ironworkers Local Union No. 3 Expansion Project1,500,000
(JJ) Construction, acquisition, redevelopment and other related costs for the Steamfitters Local Union 449 Expansion Project2,500,000
(KK) Biotechnology Commercialization project, including infrastructure improvements and other related costs3,000,000
(LL) Construction and other costs related to the centralization of facilities for UJF1,500,000
(MM) Construction and other costs related to the renovation of the Little Sisters of the Poor Health Care Pavilion500,000
(NN) Infrastructure improvements, construction and other costs related to the Mary Schenley Building renovations at the Western Pennsylvania School for Blind Children2,000,000
(OO) Infrastructure improvements, construction and other costs related to the Garfield Heights Phase I Redevelopment project4,000,000
(PP) Infrastructure improvements related to construction of the professional hockey arena302,000
(QQ) Acquisition, infrastructure improvements, construction and other costs related to the East Liberty Commercial District project20,000,000
(RR) Acquisition, infrastructure improvements, construction and other costs related to the Oak Hill Phase II project5,000,000
(SS) Construction of South Shore Riverfront Park1,000,000
(TT) Acquisition and construction of building at Carnegie Mellon University10,000,000
(UU) Construction, infrastructure, redevelopment and other costs related to the Bakery Square project7,000,000
(VV) Acquisition, infrastructure improvements, renovations, construction and other costs related to the Wood Street Commons project3,000,000
(WW) Construction of Point Park University and Wood Street Corridor Development project14,000,000
(XX) Infrastructure improvements and construction of the America's Music Crossroads Center2,000,000
(YY) Infrastructure improvements, construction and other related costs for Oakland Portal Project redevelopment30,000,000
(ZZ) Infrastructure improvements, construction, renovations and other related costs for Heinz Hall - Pittsburgh Symphony Orchestra10,000,000
(AAA) Acquisition, infrastructure improvements, construction and other related costs for the North Avenue Block/Federal North project10,000,000
(BBB) Acquisition, infrastructure improvements, construction and other related costs for the Robotics Design and Testing Facility in Hazelwood6,000,000
(CCC) Construction for the Pittsburgh Ballet Theatre expansion3,000,000
(DDD) Acquisition, infrastructure improvements, construction and other related costs for the Armed Forces Institute for Regenerative Medicine/McGowen Institute for Regenerative Medicine project30,000,000
(EEE) Construction and other costs related to the Brew House redevelopment project3,000,000
(FFF) Acquisition, infrastructure improvements, construction and other costs related to the Sarah Heinz House Expansion project500,000
(GGG) Acquisition, construction, infrastructure, redevelopment and other related costs for the Mattress Factory expansion project250,000
(HHH) Acquisition, construction, redevelopment and other costs related to the 31st Ward Community/Recreation Center2,000,000
(III) Acquisition, construction, infrastructure, redevelopment and other costs related to the Armed Forces Institute for Regenerative Medicine at the McGowan Institute30,000,000
(JJJ) Acquisition, construction, infrastructure, redevelopment and other costs related to the Amalgamated Transit Union Local No. 85 project2,000,000
(KKK) Acquisition, infrastructure improvements and other costs related to the construction of the Life Sciences Technology Growth and Incubator Projec10,000,000
(LLL) Construction, infrastructure, redevelopment and other related costs for the Baum Liberty Crossing project16,000,000
(MMM) Acquisition, construction, infrastructure, redevelopment and other related costs for a robotics design and testing facility6,000,000
(NNN) Acquisition, construction, abatement of hazardous materials and other related costs for the Craig Academy facility5,000,000
(OOO) Acquisition, construction, redevelopment and other related costs for the Theater District parking garage project10,000,000
(PPP) Acquisition, construction, redevelopment and other related costs for the Manchester Citizens Corporation Renaissance Housing project400,000
(QQQ) Construction, redevelopment and other related costs for City Theatre renovations and improvements4,000,000
(RRR) Acquisition, construction, infrastructure, redevelopment and other related costs for the Centre City Square project9,500,000
(SSS) Construction and other related costs for a new community center to serve the city's North Side4,000,000
(iii) Baldwin Borough
(A) Construction and other related costs to renovate fire department building500,000
(B) Infrastructure improvements and construction for Academy/DBA Community Specialist Corp facility4,000,000
(iv) Bethel Park
(A) Construction and other related costs for the Bethel Park Community Center expansion2,500,000
(v) Borough of Wilkinsburg
(A) Construction and other related costs for the revitalization of commercial corridor including residential housing5,000,000
(B) Construction, redevelopment and other costs related to the Smart Apartment project1,500,000
(C) Acquisition, construction, infrastructure, redevelopment and other related costs for the Crescent development project750,000
(v.1) Carnegie Borough
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to the Carnegie Borough Business District revitalization program10,000,000
(v.2) Castle Shannon
(A) Construction, infrastructure, acquisition, redevelopment and other costs related to the Shannon Station Transit Village3,000,000
(v.3) City of Clairton
(A) Design, engineering and construction of US Steel cogeneration facility25,000,000
(B) Demolition and construction for U.S. Steel coke oven project25,000,000
(v.4) City of Clairton and West Mifflin and Braddock Boroughs
(A) Construction and other related costs for a new cogeneration facility25,000,000
(B) Construction, abatement of hazardous materials and other costs related to the U.S. Steel coke oven project25,000,000
(v.5) Coraopolis Borough
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to the Coraopolis Borough Business District revitalization program10,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for the Pittsburgh Plumbers Training Facility expansion project3,000,000
(vi) Dravosburg Borough
(A) Acquisition, construction and other related costs for the Dravosburg waterfront development500,000
(vi.1) Duquesne City
(A) Infrastructure improvements, construction and other costs related to the Burns Heights Duquesne Revitalization project2,000,000
(vi.2) Borough of Edgewood
(A) Completion of linear park in Edgewood Borough adjacent to the Port Authority of Allegheny County East Busway facility3,600,000
(B) Construction, infrastructure and other related costs for upgrades to the Western Pennsylvania School for the Deaf2,000,000
(vi.3) Findlay Township
(A) Construction, infrastructure and other costs related to the Chapman Commerce Center3,000,000
(B) Construction and other related costs for Westport development project10,000,000
(vi.4) Fox Chapel Borough
(A) Construction and other related costs for the Lauri Ann West Memorial Library3,500,000
(B) Acquisition, construction and other related costs for the Beechwood Farms Nature Reserve expansion and upgrade project2,500,000
(vii) Glassport Borough
(A) Construction and other related costs for the municipal building redevelopment500,000
(B) Acquisition, construction and other related costs for demolition and redevelopment of abandoned properties500,000
(viii) Green Tree Borough
(A) Construction and other related costs for Aiken Elementary School improvements500,000
(B) Construction and other related costs for the Green Tree Road improvement project3,000,000
(viii.1) Homestead Borough
(A) Infrastructure improvements, renovations and construction of the Historic Homestead Bakery2,200,000
(viii.2) Indiana Township
(A) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the Indiana Township Town Hall and Community Center1,000,000
(viii.3) Liberty Borough
(A) Renovations and infrastructure improvements to South Allegheny Middle/High School library1,000,000
(ix) Town of McCandless
(A) Construction and other related costs for the UPMC Passavant Patient Tower expansion20,000,000
(ix.1) North Park/McCandless Township
(A) Facility upgrades and infrastructure improvements to Allegheny County Fire Training Academy1,000,000
(x) City of McKeesport
(A) Construction, abatement of hazardous materials and other costs associated with the McKeesport Fire Department building project1,000,000
(B) Construction, infrastructure and other costs associated with the Marshall Drive redevelopment project500,000
(C) Construction, redevelopment and other related costs for the McKeesport Auberle Athletic Complex project500,000
(D) Construction and other costs related to the rehabilitation of the former McKeesport City Hall for business or government use300,000
(E) Infrastructure improvements to Lyle Boulevard mixed-use development3,000,000
(x.1) McKees Rocks Borough
(A) Acquisition, infrastructure improvements, construction and related costs for Chartiers Crossing Downtown Revitalization project7,000,000
(B) Redevelopment, construction and other costs related to a cultural arts center1,500,000
(C) Construction and other related costs for the Island Studios project250,000
(x.2) Monroeville Borough
(A) Expansion, renovation and construction of Spectrum Charter School1,000,000
(B) Expansion, renovation, infrastructure improvements and construction of facilities for the Western Pennsylvania Hospital - Forbes Regional campus10,000,000
(C) Acquisition, construction and other costs related to the UPMC Healthplex East adult outpatient facility project5,000,000
(D) Acquisition and construction of a new Monroeville Chamber of Commerce building2,500,000
(E) Acquisition and construction of a new convention center or exhibition hall2,500,000
(F) Construction, infrastructure and other costs related to the Tech One Business Park4,000,000
(x.3) Moon Township
(A) Capital costs related to the relocation of the C.E. Kelley Support Facility4,200,000
(xi) Mt. Lebanon Township
(A) Construction and other related costs for the redevelopment of Washington Road business district2,500,000
(B) Construction and other related costs for a transit-oriented development project1,000,000
(C) Infrastructure, construction, rehabilitation and redevelopment of the Seton-La Salle High School athletic field into a state-of-the-art multiuse athletic facility500,000
(D) Construction, infrastructure, redevelopment and other costs related to the Shady Grove Transit Oriented Development program500,000
(E) Construction, infrastructure, redevelopment, abatement of hazardous materials and other costs related to the Denis Theatre renovation project2,000,000
(F) Acquisition, construction, infrastructure and other costs related to Mt. Lebanon parks improvement5,000,000
(xi.1) Munhall Borough
(A) Construction, infrastructure improvements and other costs related to the pump house and water tower development project5,000,000
(xi.2) Natrona Heights
(A) Expansion, renovation and construction and infrastructure improvements to Alle-Kiski Medical Center campus10,000,000
(xi.3) Neville Township
(A) Acquisition, infrastructure improvements, construction and other costs related to the Neville Crossing revitalization project3,000,000
(xi.4) O'Hara Township
(A) Construction of a new community center or renovation of existing community center, including necessary costs1,000,000
(B) Construction and related costs for the Boyd Community Center4,500,000
(xi.5) Pine Township
(A) Construction of a new volunteer fire company facility2,300,000
(xi.6) Robinson Township
(A) Infrastructure improvements, construction and other costs related to the Carnegie Museums building and Music Hall renovation projects2,000,000
(xii) Fox Chapel Borough and O'Hara Township
(A) Acquisition and construction related to redevelopment of CCLA Lauri Ann West Memorial Library1,000,000
(xiii) Coraopolis Borough
(A) Construction, infrastructure and other costs related to the development of a recreational stadium and amenities5,000,000
(xiv) McCandless Township
(A) Renovation and rehabilitation and technology upgrades to the John J. Wright Library at La Roche College500,000
(xv) Plum Borough
(A) Construction, infrastructure and other related costs for a senior health care facility5,000,000
(B) Construction, infrastructure and other related costs for the Hanna Healthcare Center project500,000
(xvi) Penn Hills Township
(A) Infrastructure improvements and construction of Imani Christian Academy2,500,000
(B) Acquisition, construction, infrastructure and other related costs for the Thompson Run Industrial Park3,000,000
(C) Construction, infrastructure and other related costs for Allegheny River Boulevard improvements4,000,000
(D) Acquisition, construction, infrastructure, redevelopment and other related costs for the Thompson Run redevelopment project2,500,000
(xvii) Summit Township
(A) Infrastructure improvements, renovations and construction of Summit Academy4,000,000
(xviii) White Oak Borough
(A) Construction and renovations of a White Oak community recreation and senior citizen center1,500,000
(B) Construction of White Oak Heritage Park Community Center1,000,000
(C) Construction and rehabilitation of the White Oak Athletic Association facilities, including gymnasium, offices and community area2,500,000
(xix) Redevelopment Authority of Allegheny County
(A) Acquisition, infrastructure, construction and other related costs for the construction of a LifeSpan - Wellness Center in Moon Township10,000,000
(B) Acquisition, site development, construction and infrastructure for the development of a research and technology park located adjacent to Interstate 79 in South Fayette Township5,000,000
(C) Infrastructure, site development and other construction-related costs in support of a mixed-use development along the University Boulevard Commercial District5,000,000
(xx) Allegheny, Armstrong, Beaver, Butler, Washington and Westmoreland Counties
(A) Construction, infrastructure, redevelopment and other related costs for the Children's Hospital of Pittsburgh30,000,000
(xxi) Allegheny, Fayette, Somerset and Westmoreland Counties
(A) Construction and other related costs for the Great Allegheny Passage Trail and community improvements2,000,000
(3) Armstrong County
(i) County projects
(A) Development of a new emergency services communications system, including land acquisition, site development and equipment purchases8,000,000
(B) Acquisition, renovations, demolition and new construction of various redevelopment projects within Kittanning Borough2,000,000
(i.1) Armstrong County Industrial Development Authority
(A) Acquisition, infrastructure and construction of the Armstrong Technology Center, a mixed-use facility, including manufacturing space2,000,000
(ii) City of Parker
(A) Land acquisition, site development and construction to support the revitalization of downtown Parker500,000
(iii) East Franklin Township
(A) Construction, infrastructure and other related costs for Armstrong County Commons10,000,000
(iv) Ford City Borough
(A) Construction, acquisition and other necessary costs for Ford City Borough Building/Public Safety Building250,000
(v) Kiskiminetas Township
(A) Acquisition, construction and other necessary costs for Kiskiminetas Township Building1,000,000
(v.1) Parks Township
(A) Construction, infrastructure and other related costs for the Kepple Hill Road project500,000
(vi) West Kittanning Borough
(A) Acquisition of land, demolition and construction of borough building500,000
(vii) Worthington Borough
(A) Construction, demolition and other necessary costs for public safety building500,000
(4) Beaver County
(i) County projects
(A) Acquisition, construction, infrastructure and other related costs for a family services center3,000,000
(B) Construction, acquisition and other necessary costs for new facility to manufacture soap and other similar products5,000,000
(i.1) City of Aliquippa
(A) Infrastructure improvements and construction of ethanol production facility in the Aliquippa Industrial Park6,000,000
(i.2) City of Beaver Falls
(A) Construction and renovations to the SBC Ministries, Inc., facility500,000
(ii) Center Township
(A) Acquisition, construction, infrastructure and other related costs for the Gateway Youth Services Center3,000,000
(iii) Midland Borough
(A) Acquisition, construction, infrastructure and other related costs for the Beaver County Industrial Museum1,500,000
(5) Bedford County
(i) County projects
(A) Infrastructure, construction and other related costs for the Bedford Memorial Surgery Center project at the University of Pittsburgh Medical Center5,000,000
(ii) West Providence Township
(A) Acquisition and construction of Everett Business Center1,500,000
(6) Berks County
(i) County projects
(A) Carpenter Technology, expansion project, for construction, infrastructure improvements and other related costs for a manufacturing and economic development project27,000,000
(B) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants1,000,000
(C) Acquisition, infrastructure improvements and construction for state-of-the-art food processing plant for the Pennsylvania agribusiness industry2,500,000
(D) Acquisition, infrastructure improvements and construction for thoroughbred horse training facility10,000,000
(ii) Bern Township
(A) Acquisition, infrastructure improvements and construction of the Reading Regional Airport Biotech Research Industrial Park5,000,000
(iii) City of Reading
(A) Infrastructure improvements and construction, including parking, for Cedarpak5,000,000
(B) ((B) repealed Oct. 19, 2010, P.L.573, No.82)
(C) Infrastructure improvements and construction of the Angelica Environmental Center3,800,000
(D) Infrastructure improvements and construction of City Park recreational facilities2,750,000
(E) Infrastructure improvements, renovations and construction of the Reading Pagoda15,000,000
(F) Acquisition, infrastructure improvements and construction for security system1,000,000
(G) Acquisition, infrastructure improvements and construction for the redevelopment of land and properties on the east side of the Schuylkill River5,000,000
(H) Acquisition, infrastructure improvements and construction for the rehabilitation and development of North Reading Industrial Tract30,000,000
(I) Infrastructure improvements and construction of a new science center for Albright College7,000,000
(J) Acquisition, demolition and construction of Buttonwood, Miltmore, Gordon and Tulpehocken Streets townhouse project8,000,000
(K) Acquisition, infrastructure improvements and construction for renovations of buildings in the 400 block of Penn Street3,000,000
(L) Infrastructure improvements and construction to convert the Liberty Fire Company to the Reading Area Firefighters Museum1,565,000
(M) Infrastructure improvements and construction of a new entrance to Alvernia College2,500,000
(N) Infrastructure improvements and construction for an addition to the Alvernia College Health and Wellness Center6,000,000
(O) Infrastructure improvements and construction for Angelica Park access and field and buildings rehabilitation project4,000,000
(P) Infrastructure improvements and construction of Reading Area Community College academic classroom instructional center20,000,000
(Q) Infrastructure improvements for Reading Hospital, including equipment upgrades10,000,000
(R) Acquisition, infrastructure improvements and construction for redevelopment of the former Garden State Tanning building4,500,000
(S) Infrastructure improvements and construction of the First Energy Stadium26,000,000
(T) Acquisition, demolition, infrastructure improvements and construction of apartments and shops at 3rd and Court Streets7,000,000
(U) Acquisition, infrastructure improvements and construction of convention center hotel and parking garage62,000,000
(V) Acquisition, infrastructure improvements and construction for the expansion of GoggleWorks No. 2 building for a children's museum and school for the arts7,000,000
(W) Acquisition, infrastructure improvements and construction of 7th and Penn Streets office building6,000,000
(X) Acquisition, demolition, infrastructure improvements and construction of South 8th Street supermarket and retail shop complex6,000,000
(Y) Infrastructure improvements and construction for restoration and renovation of Trexler Mansion for Daniel Torres Hispanic Center3,000,000
(Z) Acquisition, infrastructure improvements, construction and other costs associated with the Buttonwood Street Brownfield Rehabilitation project2,000,000
(AA) Infrastructure improvements and renovation for the Reading Public Museum2,500,000
(BB) Acquisition, infrastructure improvements, construction and other costs related to the renovation of buildings in the 400 and 500 blocks of Penn Street8,000,000
(CC) Infrastructure improvements and construction of former railroad bridge as part of a public trail, RAAC bridge improvement project1,500,000
(DD) GoggleWorks Area Renewal, demolition and construction of new and restored buildings to house shops, apartments and office space on Penn Street from 2nd to 9th Streets and 4th to 6th Streets from Penn to Chestnut Streets and Washington Street from 2nd to 3rd Streets in the area adjoining GoggleWorks5,000,000
(EE) Renovation and update of the YMCA building at 6th and Washington Streets5,000,000
(FF) Acquisition and demolition of an abandoned blighted full city block factory for development into townhouses and recreation area5,000,000
(GG) Acquisition, refurbishing and partial demolition of the former Luden's Candy Factory on North 8th Street for reuse and parking4,000,000
(iv) Hamburg Borough
(A) Construction and related infrastructure for the Hamburg Area High School stadium project500,000
(v) Kutztown Borough
(A) Infrastructure improvements and construction for security upgrades for the borough, including parts of Kutztown University campus2,000,000
(v.1) Richmond Township
(A) Acquisition, construction, infrastructure and other related costs for a recycling, manufacturing and economic development project at East Penn Manufacturing Company45,000,000
(vi) Topton Borough
(A) Infrastructure improvements and construction for the renovation and expansion of Topton Borough Hall1,500,000
(vii) West Reading Borough
(A) Land acquisition and construction of a new boardwalk trail at West Shore Boardwalk5,000,000
(B) Acquisition, infrastructure improvements, construction and other costs related to the GiggleWorks Children's Museum2,000,000
(7) Blair County
(i) County projects (Reserved)
(ii) Altoona Blair County Development Corporation
(A) Acquisition, construction and redevelopment of downtown Altoona in the vicinity of the AmTrain intermodal facility5,000,000
(B) Acquisition, infrastructure, construction and other costs related to the development of a multifunctional complex located at the South Altoona Business Park5,500,000
(C) Land acquisition, infrastructure and construction of access improvements to support the redevelopment of the former Hollidaysburg Car Shop property2,500,000
(D) Acquisition, infrastructure and construction of the Kettle Creek mixed-use development in Logan Township5,000,000
(E) Land acquisition, infrastructure, environmental cleanup, design and construction of a business park along the I-99 corridor4,000,000
(F) Acquisition, infrastructure, construction and redevelopment of a multifunctional complex located along the I-99 corridor with emphasis on the I-99 Enterprise Campus site4,000,000
(G) Land acquisition, infrastructure, redevelopment and construction of a Transportation Research and Education Center of Excellence complex along the I-99 corridor5,000,000
(iii) City of Altoona
(A) Acquisition, construction and infrastructure related to the renovation of Mishler Theatre2,100,000
(B) Land acquisition, design and construction of a parking garage and transportation center5,000,000
(C) Construction of a multipurpose facility to include parking garage, small hotel, retail and offices at 1400 12th Avenue7,500,000
(D) Construction of a physical fitness and recreational sports complex for high school and community use within the Altoona Area School District500,000
(iv) Logan Township
(A) Acquisition, construction, infrastructure and other costs related to the redevelopment of Kettle Creek mixed-use development5,000,000
(B) Construction, infrastructure, redevelopment and other related costs for the Blair County Ballpark project6,000,000
(8) Bradford County
(i) County projects (Reserved)
(ii) Central Bradford Progress Authority
(A) Infrastructure, design, equipment and other related costs for information systems and technology upgrades at the Towanda Memorial Hospital1,200,000
(iii) North Towanda Township
(A) Construction, expansion, improvements and other related costs for Dupont Company imaging technology25,000,000
(9) Bucks County
(i) County projects
(A) Acquisition and demolition of flood-damaged properties in the Oak Tree section of Bristol Township500,000
(B) Renovations, construction and expansion of the historic Mercer Museum, Bucks County Historical Society5,000,000
(C) Acquisition, renovations, construction and other related costs for the rehabilitation and expansion of the Network of Victim Assistance (NOVA) headquarters in Jamison1,000,000
(D) Rehabilitation and construction of a health care and diagnostic center4,000,000
(E) Infrastructure, construction and other related costs for the redevelopment of the Horizon Corporate Center4,500,000
(F) Construction and renovations of an inpatient Mother/Baby Unit at the St. Mary Medical Center1,000,000
(G) Construction and renovations of an inpatient unit at the St. Mary Medical Center for the purposes of creating a private room medical-surgical unit1,250,000
(H) Bucks County Community College
(I) Renovations and ADA accessibility improvements to a gymnasium1,000,000
(II) Renovations and upgrades to the Rollins Student Center1,351,000
(III) Construction of a classroom and faculty office building8,000,000
(ii) Bensalem Township
(A) Renovation of the Mack Park recreation complex, including construction250,000
(B) Infrastructure, construction and other related costs for renovations of the Bensalem Emergency Medical Services headquarters1,000,000
(C) Construction and other necessary costs for expansion of police administrative building3,000,000
(D) Acquisition of 120 acres of golf course property for community access5,000,000
(E) Acquisition of 50 acres of property in the Trevose section of Bensalem Township for community access3,000,000
(F) Acquisition of land along the Delaware riverfront for community access7,000,000
(G) Construction of emergency services training facility for police, fire and rescue services6,000,000
(H) Construction and related costs for residence buildings to house inpatient beds for a drug and alcohol treatment program1,000,000
(I) Construction and other related costs of waterfront transit-oriented development for Bucks County Redevelopment Authority5,000,000
(iii) Bristol Borough
(A) Construction, infrastructure and other related costs for parking facilities3,000,000
(B) Construction, infrastructure and other related costs for waterfront development2,000,000
(C) Acquisition, construction, infrastructure and other related costs for waterfront development along the Delaware River2,000,000
(D) Acquisition, construction, infrastructure and other related costs for Elm and Chestnut Streets redevelopment2,500,000
(E) Infrastructure, renovation, expansion and other related construction costs for the Regional Public Safety Training Center600,000
(F) Infrastructure, construction, redevelopment and enhancement of the Memorial Fields, located at Jefferson Avenue and Garden Street750,000
(iv) Bristol Township
(A) Infrastructure, redevelopment and other related costs to convert the Lower Bucks Hospital to a full telemetry-based hospital1,000,000
(B) Infrastructure, redevelopment and other related costs for Lower Bucks Hospital security upgrades and bioterrorism training575,000
(C) Construction, infrastructure and other related costs to rebuild the Lower Bucks Hospital Patient Unit 4F3,000,000
(D) Infrastructure, redevelopment and other related costs to purchase three portable orthopedic X-ray machines for Lower Bucks Hospital420,000
(E) Construction, infrastructure and other related costs for the renovation of the Bristol Township municipal building8,000,000
(F) Infrastructure, redevelopment and other related costs to build a Lower Bucks Hospital vascular lab2,000,000
(G) Infrastructure, redevelopment and other related costs for safety and code upgrades for Lower Bucks Hospital2,500,000
(H) Infrastructure, redevelopment and other related costs to purchase a 64-slice CT scanner for Lower Bucks Hospital2,500,000
(I) Infrastructure, redevelopment and other related costs to purchase two digital mammography systems for Lower Bucks Hospital725,000
(J) Infrastructure, redevelopment and other related costs to purchase Computerized Physician Order Entry (CPOE) systems for Lower Bucks Hospital1,500,000
(iv.1) Buckingham Township
(A) Acquisition, construction, infrastructure and other related costs of a new facility for the Bucks County Children's Museum1,500,000
(v) Chalfont Borough
(A) Acquisition and construction for Chalfont Firehouse500,000
(B) Acquisition, construction, infrastructure and other costs related to the expansion of The Children's Hospital of Philadelphia Specialty Care and Ambulatory Surgery Center500,000
(v.1) Doylestown Township
(A) Renovations and construction of a new Emergency Department at the Doylestown Hospital30,000,000
(vi) Falls Township
(A) Construction and other related costs for the Falls Township Senior Citizen Center1,000,000
(vii) Hilltown Township
(A) Construction and restoration of Pearl S. Buck House1,000,000
(viii) Hulmeville Borough
(A) Renovations and expansion of the William Penn Fire Company substation500,000
(ix) Langhorne Borough
(A) Expansion and renovation of St. Mary's Hospital, including construction1,000,000
(ix.1) Lower Southampton Township
(A) Acquisition, construction and other costs related to the Lower Southampton Area Community Center5,000,000
(x) Middletown Township
(A) Construction and other related costs for the Middletown Community Center1,500,000
(B) Construction, redevelopment and other costs related to the St. Mary Medical Center2,500,000
(x.1) Morrisville Borough
(A) Acquisition, construction, infrastructure and other related costs for the new Morrisville Fire Company building1,000,000
(xi) Nockamixon Township
(A) Renovation of Central Bucks Senior Center, including construction and related infrastructure60,000
(xi.1) Northampton Township
(A) Construction and necessary costs for new building for police department1,250,000
(B) Improvements to historic Dolington streetscape, including sidewalks2,100,000
(C) Northampton Township park and recreation capital improvements750,000
(xii) Sellersville Borough
(A) Construction of the Recovery Center at Penn Foundation, including related infrastructure costs1,000,000
(xiii) Warrington Township
(A) Construction of West End Fire Station, including related infrastructure500,000
(xiii.1) Warwick Township
(A) Construction of new building for Warwick Township Fire Company, including necessary costs1,000,000
(xiv) Quakertown Borough
(A) Construction and rehabilitation of Upper Bucks YMCA2,000,000
(10) Butler County
(i) County projects
(A) Community Development Corporation of Butler County
(I) Acquisition, infrastructure, construction and development of the Buffalo Township Business and Technology Park, located on a 40-acre parcel of land at the intersection of Route 28 and Route 3561,500,000
(II) Infrastructure, construction and renovation of the former Pullman Standard office building for use as a multitenant, mixed-use facility3,000,000
(III) Acquisition, infrastructure, construction and redevelopment of a 20-acre parcel of brownfield land in the former jet fuel additive facility in Forward Township1,000,000
(B) Renovations and construction of the central historical museum and preservation of several other historical properties2,000,000
(C) Construction of the Alameda Sports and Exhibition Complex4,000,000
(D) Infrastructure, development and construction of a new arts and cultural center on the Butler County Community College campus in Butler Township6,600,000
(E) Acquisition, construction, infrastructure and other related costs for a new inpatient facility at Butler Memorial Hospital20,000,000
(F) Infrastructure, construction and renovation of the Beck Library and Learning Resource Center at Butler County Community College1,500,000
(ii) City of Butler
(A) Construction and related costs for redevelopment of downtown district, including related infrastructure6,000,000
(B) Acquisition and development of former Pullman Standard Office Building for use as a multitenant facility3,000,000
(iii) Buffalo Township
(A) Acquisition, construction and related infrastructure for business and technology park1,500,000
(iv) Butler Township
(A) Construction of Butler Crossing project, including related infrastructure6,000,000
(v) Forward Township
(A) Acquisition and construction of business park, including related infrastructure1,000,000
(vi) Jackson Township
(A) Infrastructure, site development and other construction-related activities in support of preparing property along Route 19 in the vicinity of Route 528 for economic development5,000,000
(vii) Slippery Rock Borough
(A) Infrastructure, development, construction and other related costs for the Performing Arts Center at Slippery Rock University10,000,000
(11) Cambria County
(i) County projects
(A) Construction of Workforce Development Center for Pennsylvania Highlands Community College500,000
(B) Construction and renovations for the Cambria County War Memorial1,000,000
(C) Acquisition, construction and other related costs to establish a health and bioscience educational facility6,000,000
(D) Construction, infrastructure improvements and other costs related to a school of nursing at the University of Pittsburgh at Johnstown4,000,000
(ii) City of Johnstown
(A) Acquisition, construction, infrastructure and other related costs for brownfield redevelopment, including Festival Park5,000,000
(B) Acquisition, construction, infrastructure and other related costs for downtown housing redevelopment5,000,000
(C) Acquisition, construction, infrastructure and other related costs for Greater Johnstown YMCA redevelopment, including a community center5,000,000
(D) Acquisition, infrastructure improvements and construction for the Greater Johnstown Regional Tech Park, phases II and III7,000,000
(E) Construction and other related costs for a new health and bioscience facility at the University of Pittsburgh at Johnstown3,500,000
(ii.1) Ebensburg Borough
(A) Rehabilitation of existing buildings, construction and infrastructure related to Ebensburg downtown revitalization1,000,000
(iii) Richland Township
(A) Acquisition, construction, infrastructure and other related costs for the East Hills redevelopment, including a recreation center7,000,000
(12) Cameron County (Reserved)
(13) Carbon County
(i) County projects
(A) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants1,000,000
(ii) Jim Thorpe
(A) Renovations for the Carbon County Courthouse500,000
(B) Renovations for the Carbon County Courthouse Annex300,000
(C) Acquisition, construction, infrastructure, redevelopment and other costs related to the Flagstaff Resort Gondola project2,500,000
(ii.1) Kidder Township
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for the Kidder Township emergency services building1,500,000
(ii.2) Lehighton Borough
(A) Acquisition, construction, infrastructure, redevelopment and other related costs for a new fire department building1,750,000
(ii.3) Mahoning Township
(A) Construction, redevelopment and other related costs for the Mahoning Township municipal building750,000
(iii) Mahoning and Lehighton
(A) Infrastructure improvements, development and related costs for the Packerton Yards Industrial Park3,000,000
(B) Construction, infrastructure, redevelopment, abatement of hazardous materials and other costs related to the Packerton Yards Industrial Park site improvements1,250,000
(iii.1) Nesquehoning Borough
(A) Construction, redevelopment and other costs related to the AMETEK expansion project3,000,000
(iv) Palmerton Borough
(A) Construction, infrastructure and other related costs for the regional Wall Street West Initiative25,000,000
(iv.1) Summit Hill Borough
(A) Construction, infrastructure and other related costs for restoration of the Switchback Gravity Railroad site8,000,000
(v) Weatherly Borough
(A) Acquisition, construction, infrastructure and other related costs for the railroad/steel revitalization project1,500,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for a new municipal complex, including volunteer fire department buildings2,500,000
(14) Centre County
(i) County projects
(A) Construction, infrastructure and other related costs for the expansion of CPI Workforce Development1,000,000
(B) Construction, infrastructure and other related costs for a new biofuels plant25,000,000
(C) Construction, infrastructure and other related costs for the Phillipsburg Borough Hall2,000,000
(D) Acquisition, construction and other related costs for the Hope and Reliance United Firefighter Center1,000,000
(E) Acquisition, construction, infrastructure and other related costs for the Centre County Recreation Center20,000,000
(F) Construction, infrastructure and other related costs for the Moshannon Valley Economic Partnership Industrial Park1,000,000
(G) Infrastructure, construction and other related costs for the redevelopment of lands adjacent to the Colonnade Shopping Center5,000,000
(H) Acquisition of a 20-acre parcel of land, site development and construction of facilities, including transportation and medical arts training centers5,000,000
(I) Acquisition, construction, infrastructure and other related costs for Centre County PAWS350,000
(J) Acquisition, construction, renovation, infrastructure and other related costs for a medical facility in the Moshannon Valley area3,000,000
(i.1) Bellefonte Borough
(A) Acquisition, infrastructure improvements and construction for County Seat parking and transit facility2,500,000
(ii) Centre Hall Borough
(A) Acquisition, construction, infrastructure and other related costs for the Grange Fair Multipurpose Complex750,000
(ii.1) Phillipsburg Borough
(A) Infrastructure, redevelopment and other related costs for Phillipsburg Hospital renovations and improvements1,500,000
(iii) State College Borough
(A) Acquisition, construction, infrastructure and other related costs for a downtown redevelopment project12,000,000
(15) Chester County
(i) County projects
(A) Construction, acquisition and related infrastructure for the Southeastern Chester County Refuse Authority550,000
(B) Improvements to buildings located within the Lukens' National Historic District campus, including necessary costs2,000,000
(C) Construction and related costs for a hybrid school as a joint project of the Chester County Intermediate Unit and Delaware County Community College2,000,000
(i.1) City of Coatesville
(A) Acquisition, infrastructure, environmental remediation, construction and other related costs for the redevelopment of a brownfield property known as the Flats property20,000,000
(ii) Downingtown Borough
(A) Acquisition, construction, infrastructure and other related costs for River Station Downingtown Redevelopment9,500,000
(B) Infrastructure improvements and construction of pedestrian and bike path system along the Brandywine Creek connecting to the Struble Trail500,000
(C) Construction, infrastructure improvements and other related costs for the Downingtown Senior Center and library expansion project1,500,000
(ii.1) Malvern Borough and East Whiteland Township
(A) Infrastructure improvements, renovations and construction for the Bishop Tube complex2,500,000
(ii.2) Malvern Borough
(A) Infrastructure and construction of the Malvern Fire Company building500,000
(ii.3) Phoenixville Borough
(A) Phoenixville library expansion and construction of a new facility1,000,000
(B) Construction, infrastructure and other related costs for a borough parking garage3,500,000
(iii) Schuylkill Township
(A) Expansion of the Phoenixville YMCA, including construction3,000,000
(iv) Spring City Borough
(A) Spring City library expansion and construction of a new facility1,200,000
(v) South Coatesville Borough and East Fallowfield Township
(A) Infrastructure improvements and construction of Chester County fire-police training facility2,000,000
(B) Construction and related infrastructure to expand the Jenkins Arboretum Education Center1,000,000
(vi) West Bradford Township
(A) Infrastructure improvements and construction of a new animal shelter and medical facility1,000,000
(vi.1) West Chester
(A) Chester County Historical Society, building renovation improvements, including construction and other related costs1,000,000
(B) Acquisition, infrastructure improvements and construction of Undergraduate Business Center at West Chester University of Pennsylvania3,000,000
(C) Acquisition, construction, infrastructure and other costs related to the expansion of the Hickman Senior Housing project2,000,000
(D) Construction, infrastructure, redevelopment and other costs related to the Mosteller Parking Garage replacement project1,000,000
(E) Construction, redevelopment and other costs related to the Charles Melton Community Center1,000,000
(vii) West Chester Borough and West Goshen Township
(A) Infrastructure improvements and construction of a cardiovascular center at Chester County Hospital10,000,000
(viii) West Pikeland Township
(A) Renovations to the Historic Washington Building at Historic Yellow Springs, including infrastructure improvements and construction750,000
(ix) Willistown Township
(A) Infrastructure improvements and construction of a nature and community center on Willistown's Okehocking Preserve1,000,000
(16) Clarion County
(i) County projects
(A) Infrastructure, construction, redevelopment and other related costs for the construction of a reservoir/dam to provide an alternate water supply for the Beaver Creek Keystone Innovation Zone100,000
(B) Infrastructure, construction, rehabilitation and other related costs for improvements to a water supply that serves the Clarion County Commerce Center Keystone Opportunity Zone and the Knox Industrial Park375,000
(C) Redevelopment and construction of incubator space within the Clarion University Biotechnology Business Development Center and incubator facility located in the Trinity Point Technology Park850,000
(ii) Foxburg Borough
(A) Site development and construction of Municipal Center Building to support downtown revitalization3,000,000
(iii) Clarion Borough
(A) Infrastructure and construction of a sidewalk along Greenville Avenue from Rheinhard Village to Clarion University500,000
(iv) Clarion Township
(A) Site development and construction of Clarion County YMCA facility, including land acquisition and related infrastructure3,500,000
(B) Expansion of Clarion County YMCA5,000,000
(17) Clearfield County
(i) County projects
(A) Construction and other related costs for the wood pellet mill project1,000,000
(B) Construction and other costs associated with the Biomass Conversion Center of Excellence2,750,000
(C) Construction, infrastructure and other costs related to coal gasification project20,000,000
(D) Expansion of facilities to accommodate Health Information Technology (HIT) and Western PA Health Information Connection (HIC), including construction of a new 10,000-square-foot building and associated infrastructure improvements at DuBois Regional Medical Center875,000
(E) Construction, infrastructure and other related costs for a coal-fired power plant20,000,000
(ii) Clearfield Borough
(A) Acquisition, construction, infrastructure and other related costs for riverfront development6,000,000
(B) Construction, infrastructure and other related costs for a riverwalk, park revitalization and fish ladder along the Susquehanna River2,500,000
(C) Construction, infrastructure and other related costs for business district parking facilities5,000,000
(D) Construction of a new center for performing arts as part of the downtown Clearfield revitalization, including land acquisition and infrastructure improvements2,000,000
(E) Construction and infrastructure improvements for the development of the Clearfield Renewable Energy District5,000,000
(F) Downtown redevelopment, including pedestrian enhancements necessary to implement a strategy to encourage business and governmental entities to relocate to the borough5,000,000
(G) Construction of a new centralized firehouse to support the consolidation of four existing fire departments, including land acquisition and infrastructure improvements1,500,000
(H) Construction of a 300-space parking facility to be located near the Clearfield County Courthouse, including land acquisition and infrastructure improvements5,000,000
(I) Clearfield Hospital imaging department improvements, including acquisition of a 1.5T High Field Strength Short Bore MRI, Breast MRI Computer Aided Detection System, Dual Head Nuclear Medicine Camera and Full body axial fan beam bone densitometer1,045,000
(J) Renovation and expansion of the Emergency Department of Clearfield Hospital to increase capacity from 12 beds to 24 beds1,750,000
(ii.1) City of DuBois
(A) Acquisition, construction, redevelopment and other costs related to the construction of a state-of-the-art baseball field, including a grandstand, locker room facilities and a parking lot1,250,000
(iii) Curwensville Borough
(A) Infrastructure and other costs related to building the Sunnyside Ethanol Manufacturing Plant5,000,000
(iii.1) Foxburg Borough
(A) Community redevelopment relating to public improvements5,000,000
(iii.2) Irvona Borough
(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the Irvona Brickyard2,000,000
(iv) Karthaus Township
(A) Construction, infrastructure and other costs associated with the River Hill Power Waste Coal Fired Power Plant15,000,000
(v) Lawrence Township
(A) Construction and other related costs for a BioEnergy Ethanol Plant5,000,000
(B) Acquisition, construction, infrastructure and other related costs for Phase II of the Clearfield Firemen's Commerce Park project5,000,000
(vi) Union Township
(A) Construction, infrastructure and other related costs for the Anderson Creek Reservoir3,500,000
(18) Clinton County
(i) County projects
(A) Acquisition, construction and other related costs for the Beech Creek watershed project5,000,000
(B) Construction and other related costs for the Annie Halenbake Ross Library and Renovo Library1,000,000
(C) Acquisition, construction, infrastructure and other related costs for the Susquehanna River Corridor2,000,000
(D) Construction, acquisition, redevelopment and other costs related to the Bucktail Medical Center250,000
(E) Construction, infrastructure and other related costs for the Lamar Township Business Park access improvement project7,500,000
(ii) City of Lock Haven
(A) Construction, infrastructure and other costs associated with the Downtown Streetscape improvement project1,250,000
(B) Construction and other related costs for the First Quality Products manufacturing facility1,000,000
(iii) Mill Hall Borough
(A) Acquisition, construction and other related costs for Millbrook Playhouse1,000,000
(iii.1) Renovo Borough
(A) Improvements to railcar facility at Renovo Industrial Park to enhance production, including utility improvements, rail improvements and building renovation and improvements3,000,000
(iv) Wayne Township
(A) Construction and other related costs for Zindel Park development and improvements500,000
(19) Columbia County (Reserved)
(20) Crawford County
(i) County projects
(A) Renovations, rehabilitation and other related costs for the restoration of the historic Tarbell House located in the City of Titusville
(i.1) City of Meadville500,000
(A) Infrastructure, construction and other related costs for a Meadville Police indoor shooting range and training facility2,250,000
(B) Construction of the Northwest Pennsylvania Railroad and Tooling Center, including necessary costs3,000,000
(C) Infrastructure, construction and other related costs for the development of the Northwestern Pennsylvania Railroad and Tooling Heritage Center3,000,000
(ii) Vernon Township
(A) Acquisition, construction, infrastructure and other related costs for the Crawford County Industrial Park East2,000,000
(iii) Redevelopment Authority of the City of Meadville
(A) Redevelopment of the Talon 5 facility for mixed-use development3,000,000
(iv) Titusville Redevelopment Authority
(A) Construction, renovation, infrastructure and redevelopment of the Titusville Opportunity Park Keystone Opportunity Zone2,000,000
(21) Cumberland County
(i) County projects
(A) Infrastructure, site development, construction, transportation-related improvements and other costs related to the Shippensburg Township community and economic development project10,000,000
(i.1) Cumberland County Redevelopment Authority
(A) Construction and related infrastructure to upgrade the Shippensburg University Athletic Complex2,500,000
(ii) Borough of Carlisle
(A) Construction of addition to Bosler Library2,500,000
(B) Acquisition and expansion of Carlisle Central Farmers Market750,000
(C) Infrastructure, construction and rehabilitation of the Central Pennsylvania Youth Ballet Dance Performance Complex at Dickinson College2,500,000
(ii.1) Borough of Lemoyne
(A) Infrastructure, construction, rehabilitation and other related costs for the replacement of the community pool750,000
(B) Acquisition, construction, redevelopment and other related costs for Phase 2 of the downtown redevelopment project, including traffic enhancements, lighting, landscaping and other necessary rehabilitation5,000,000
(C) Acquisition, infrastructure, construction and other related costs for the replacement of the West Shore Bureau of Fire station1,500,000
(iii) Borough of Mechanicsburg
(A) Acquisition related to the construction of a new facility for the Mechanicsburg Art Center1,250,000
(iv) Shippensburg Township
(A) Infrastructure improvements and construction of Shippensburg Regional Conference Center3,000,000
(v) Silver Spring Township
(A) Construction, site preparation and other related costs for a mixed-use development5,000,000
(vi) Upper Allen Township
(A) Construction of Rider-Musser mixed-use development operated by Messiah College, including related infrastructure7,500,000
(B) Construction of a regional conference center at Messiah College, including related infrastructure6,000,000
(22) Dauphin County
(i) County projects
(A) Renovations to the Hershey Memorial Field Complex1,500,000
(B) Construction of an emergency medical facility in Upper Dauphin County, including necessary costs20,000,000
(C) Construction and other related costs for Dauphin County Bishop McDevitt revitalization project20,000,000
(ii) City of Harrisburg
(A) Construction and other related costs for the Pinnacle Health Hospital Emergency Department5,000,000
(B) Construction, infrastructure and other related costs for renovation of the Whitaker Center for Science and the Arts1,500,000
(C) Construction and other costs related to the Pennsylvania Law Enforcement Memorial1,500,000
(D) Construction, equipment, infrastructure and other related costs for renovations to create a psychiatric evaluation unit at the Polyclinic Campus of Pinnacle Health Hospital9,000,000
(E) Construction and renovation of a new Capital Region Health System, Inc., Medical Center5,000,000
(F) Construction and renovation of academic offices, student housing and classrooms in downtown Harrisburg3,500,000
(G) Construction, equipment, infrastructure and other related costs for the Outpatient Cancer Treatment Center at the Community Campus of Pinnacle Health System13,000,000
(iii) Derry Township
(A) Acquisition, construction, infrastructure and other related costs for the Hershey Area Master Plan25,000,000
(B) Construction, fit out, renovation, equipment and related costs for the Hershey Center for Applied Research25,000,000
(C) Expansion of bike path, including necessary costs2,000,000
(D) Hershey streetscape project, including necessary costs3,000,000
(iii.1) Hummelstown Borough
(A) Renovation of Hummelstown Chemical Fire Company No. 1 facility, including necessary costs1,500,000
(iv) Lower Paxton Township
(A) Construction of Heroes Grove, including related infrastructure4,000,000
(B) Construction and development of the Thomas B. George Park1,000,000
(iv.1) Lower Paxton and Swatara Townships
(A) Construction and other related costs for Lower Paxton and Swatara Townships Revitalization Corridor5,000,000
(iv.2) Middletown Borough
(A) Construction and renovation to Middletown Volunteer Fire Department facility, including necessary costs2,500,000
(v) Middle Paxton Township
(A) Construction of a facility to house the Dauphin Middle Paxton Fire Company, including necessary costs1,500,000
(vi) Swatara Township
(A) Construction and infrastructure related to the development of Swatara Commons10,000,000
(23) Delaware County
(i) County projects
(A) Acquisition and other related costs to TriBorough Fire Company Consolidation500,000
(B) Delaware County Housing Authority, acquisition, infrastructure and construction of the Fairgrounds housing development located near I-95 and the Commodore Barry Bridge on Engle Street1,500,000
(C) Delaware County Redevelopment Authority, acquisition, infrastructure, construction and other related costs for the redevelopment of properties in the Penn Hills area of Ridley Township2,000,000
(D) Infrastructure improvements and renovations to the Nile Swim Club500,000
(E) Acquisition, construction and other costs related to the Delaware County streetscape and infrastructure improvements project500,000
(F) Construction of the new Military College of Pennsylvania on the campus of Valley Forge Military Academy and College7,000,000
(G) Construction of new academic and military training facilities, including repair and replacement of existing infrastructure7,000,000
(H) Construction and related costs for the STEM Complex at Delaware County Community College1,500,000
(I) Capital improvements to facilitate economic development in Clifton Heights and Upper Darby3,000,000
(i.1) Brookhaven Borough
(A) Construction and other related costs for the Brookhaven Borough Hall energy project500,000
(ii) City of Chester
(A) Acquisition, construction, infrastructure and other related costs for the downtown revitalization5,000,000
(B) Chester Economic Development Authority
(I) Infrastructure improvements, environmental remediation, bulkhead repairs, site preparation, parking, exhibition space and multipurpose recreational and sports facilities for the Chester Waterfront45,000,000
(II) Infrastructure improvements, bulkhead repairs and site preparation for additional redevelopment of the waterfront area in conjunction with recent housing and commercial redevelopment18,000,000
(III) University Crossing, development of a commercial mixed-use project with a 48-room hotel and commercial, retail and office space located on inner city lots adjacent to the Widener University campus in the City of Chester250,000
(C) Construction and other related costs for the new supermarket project2,500,000
(D) Construction and other related costs for the Shop Rite supermarket project4,000,000
(E) Infrastructure, construction and other related costs for a redevelopment project on the Deshong tract located on Avenue of the States on the east side of Interstate 956,000,000
(ii.1) Chester Township
(A) Site acquisition, redevelopment of existing improvements, construction, infrastructure and related site preparation and equipping for a film/television studio project and related tourist facilities15,000,000
(iii) Clifton Heights
(A) Acquisition and construction of municipal service building and property enhancements3,000,000
(iii.1) Concord Township
(A) Construction of the Concord Township Center, including renovation of a historic schoolhouse building800,000
(iii.2) Borough of Darby
(A) Design, development, construction and renovation of new private rooms at Mercy Fitzgerald Hospital1,538,000
(B) Construction of Darby Town Center, including infrastructure and other related costs4,500,000
(iv) Edgemont Township
(A) Construction of a multipurpose, professional indoor equestrian arena500,000
(v) Glenolden Borough
(A) Redevelopment and construction related to the revitalization of various borough buildings500,000
(vi) Haverford Township
(A) Construction and other related costs for the Haverford Township Community Center8,000,000
(B) Renovations and expansion of the Main Line Art Center600,000
(vi.1) Borough of Media
(A) Construction of a new facility for the Historical Pennsylvania Veterans Museum, including land acquisition and the expansion and renovation of existing facilities3,500,000
(B) Renovation, rehabilitation and expansion of the Media Theatre facilities, including construction and land acquisition for ancillary facilities850,000
(C) Construction and related costs for buildings for the Elwyn School1,000,000
(vii) Norwood Borough
(A) Construction of firehouse and police station, including facility demolition and site preparation3,000,000
(viii) Radnor Township
(A) Construction, infrastructure and related costs to renovate Woodcrest Mansion5,000,000
(B) Construction, infrastructure and other related costs for the new Military College of Pennsylvania7,000,000
(C) Infrastructure improvements, construction and related costs for the Center for Performing Arts at Eastern University5,000,000
(ix) Ridley Park Borough
(A) Redevelopment and construction related to the revitalization of various borough buildings1,000,000
(B) Infrastructure improvements and construction to Taylor Hospital2,000,000
(x) Ridley Township
(A) Construction, infrastructure and other related costs for the Ridley Township Community Center2,000,000
(x.1) Springfield Borough
(A) Renovation and expansion of the Burn Treatment Center at Crozer-Keystone Health System2,000,000
(xi) Swarthmore Borough
(A) Construction, acquisition, infrastructure and other costs related to the Swarthmore Town Center Development2,000,000
(B) Acquisition, construction, infrastructure and other costs related to the Swarthmore Town Center development project5,000,000
(xi.1) Swarthmore, Rutledge and Morton Boroughs
(A) Acquisition of land for the Tri-Borough Fire Company consolidation500,000
(xi.2) Tinicum Township
(A) Construction of police facilities, including related costs1,000,000
(xii) Upper Darby Township
(A) Construction of public safety building, including land acquisition and related costs7,000,000
(B) Construction and abatement of hazardous materials related to demolition of 501 Bywood2,500,000
(C) Construction, infrastructure and other costs related to rehabilitation of St. Charles Cemetery1,000,000
(D) Acquisition, rehabilitation and construction of a state-of-the-art public safety building6,500,000
(E) Construction related to the redevelopment of a former warehouse facility, including necessary costs500,000
(xiii) Marcus Hook Borough
(A) Acquisition, infrastructure and construction of the Marcus Hook Station Square, a housing and commercial space development, located adjacent to the Marcus Hook train station at the intersection of Market and East 10th Streets in Chester Township1,000,000
(xiv) Marple Township
(A) Demolition of the township building and other related costs for the disposal of any environmental hazards500,000
(24) Elk County
(i) County projects (Reserved)
(ii) City of St. Mary's
(A) Impact St. Mary's streetscape and infrastructure improvements, including sidewalks, curbing, streetlights, street trees, lawns and signage to be located along Depot Street and Erie Avenue, replacement of the Iron Run Bridge and extension of Stackpole Street to Washington Street3,000,000
(B) Repair and renovation of the skate park and skate pond, construction of walking paths and upgrading of playground and park equipment at Kaulmont Park2,000,000
(iii) St. Mary's Area Economic Development Corporation
(A) Construction of a new medical/surgical inpatient floor, including acquisition of equipment and electronic medical records systems for Elk Regional Health Center7,500,000
(25) Erie County
(i) County projects
(A) Erie-Western Pennsylvania Port Authority
(I) Infrastructure and construction of restrooms and a concession building within Liberty Park1,500,000
(II) Infrastructure, rehabilitation, construction and other related costs to repair a deteriorated dock wall at East Dobbins Landing2,000,000
(B) Erie County General Authority
(I) Acquisition, infrastructure, construction and other related costs of acquiring and developing a parcel of land for commercial and industrial use3,000,000
(C) Construction, renovations and expansion of the expERIEnce Children's Museum, located in the historic district of downtown Erie2,000,000
(D) Construction and infrastructure for a SONET-based fiber-optic telecommunications system4,250,000
(E) Construction and other related costs for a new community college in Erie County10,000,000
(i.1) City of Corry
(A) Acquisition, construction, redevelopment and other related costs for the construction of a new critical access hospital facility17,500,000
(ii) City of Erie
(A) Acquisition, construction, infrastructure and other related costs for Downtown Erie revitalization15,000,000
(B) Design, infrastructure and construction of a new pharmacy school at Lake Erie College of Osteopathic Medicine20,000,000
(C) Acquisition, infrastructure, construction, redevelopment and other related costs for upgrades, improvements and enhancements to the Erie Event Complex25,000,000
(D) Construction, infrastructure, redevelopment and other costs related to development of the downtown cultural and entertainment district25,000,000
(E) Redevelopment of SB3 Industrial Park to make park shovel ready for new development, including necessary costs5,000,000
(F) Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the Erie City Mission project6,000,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for the John Kanzius Radio Wave Cancer Treatment project50,000,000
(iii) Harborcreek Township
(A) Acquisition, infrastructure, construction and other related costs for the development of a large-scale retail and entertainment complex in the vicinity of Brehand Campus of The Pennsylvania State University12,000,000
(iii.1) Lawrence Park Township
(A) Construction and other related costs for a clean and efficient diesel test facility8,000,000
(iv) Redevelopment Authority of the City of Corry
(A) Acquisition, infrastructure, renovations and rehabilitation of five buildings comprising the west side of Center Street between Washington Avenue and Main Street in the City of Corry for the development of multitenant, mixed-use facilities2,750,000
(26) Fayette County
(i) County projects
(A) Connellsville Airport, construction of runway 5-23 extension1,000,000
(B) Demolition, acquisition, construction and other related costs for the Fay-Penn Industrial Building project3,000,000
(C) Demolition, acquisition, construction and other related costs for the Fayette Institute of Technology10,000,000
(D) Acquisition, infrastructure improvements, construction and other related costs for the Fay-Penn Spec Building project1,500,000
(ii) City of Uniontown
(A) Construction and other costs related to the expansion and renovation of Uniontown Hospital10,000,000
(B) Construction, acquisition, redevelopment and other costs related to the downtown Uniontown redevelopment project1,800,000
(iii) Brownsville Borough
(A) Acquisition, construction, infrastructure and other related costs for the downtown revitalization2,000,000
(B) Renovations and construction of the Transportation Museum500,000
(iii.1) North Union Township
(A) Acquisition, infrastructure improvements and construction for the North Union Township Community Center3,500,000
(B) Eberly Campus, Fayette, construction of annex to community center750,000
(C) Eberly Campus, Fayette, construction of annex to library875,000
(D) Eberly Campus, Fayette, construction of baseball/softball complex750,000
(E) Eberly Campus, Fayette, renovations to the Center for Community and Public Safety office400,000
(F) Eberly Campus, Fayette, construction of residence hall10,000,000
(iv) Perry Township
(A) Construction of new township municipal building1,000,000
(v) South Union Township
(A) Construction, redevelopment and other related costs for the Uniontown Area YMCA expansion1,000,000
(27) Forest County (Reserved)
(28) Franklin County
(i) County Projects
(A) Infrastructure, construction and other related costs related to the construction of a roadway through the Greencastle-Antrim Industrial Park II1,200,000
(B) Construction of track facility at James Buchanan High School, including necessary costs1,000,000
(ii) Greene Township
(A) Infrastructure, construction and other related costs for redevelopment related improvements to the intersection of Route 11 and Route 9971,200,000
(iii) Waynesboro Borough
(A) Infrastructure, construction and other related costs related to the revitalization of downtown, including the installation of a paver sidewalk along Main Street532,000
(29) Fulton County
(i) County projects
(A) Construction of a multitenant building within the Fulton County Business Park1,000,000
(ii) Ayr Township
(A) Construction of a multitenant building in Fulton County Business Park, including necessary costs1,000,000
(30) Greene County
(i) County projects (Reserved)
(ii) Cumberland Township
(A) Construction, infrastructure, redevelopment and other costs associated with the Carmichaels Clinic Expansion500,000
(B) Acquisition, infrastructure improvements, construction and other costs related to a tire recycling facility in Paisley Park6,000,000
(iii) Franklin Township
(A) Acquisition, construction and related site preparation for the Cornerstone Health Care Center750,000
(B) Construction and other related costs for the Community Aquatic Center1,000,000
(C) Construction and other related costs for the expansions of the addition of Southwest Regional Medical Center1,500,000
(iv) Morgan Township
(A) Development, construction and other related costs for completion of the Mather Gob Pile reclamation project4,500,000
(v) Jefferson Township
(A) Acquisition, construction, infrastructure and other costs related to the Jefferson Township manufacturing facility500,000
(vi) Perry Township
(A) Construction, infrastructure and other related costs for the Meadow Ridge Business Park3,000,000
(vii) Waynesburg Borough
(A) Construction, acquisition, infrastructure, redevelopment and other costs associated with downtown Waynesburg streetscape improvements1,000,000
(B) Acquisition, construction, infrastructure and other related costs for the Greene County ARC Project1,000,000
(C) Acquisition, construction, infrastructure and other related costs for Waynesburg redevelopment project2,000,000
(D) Acquisition and construction of the Downtown Waynesburg Revitalization Mixed-Use Impact project5,000,000
(31) Huntingdon County
(i) County projects (Reserved)
(ii) Huntingdon Borough
(A) Acquisition, construction and rehabilitation of a train station structure on Allegheny Street in the Huntingdon Borough Historic District1,103,000
(B) Infrastructure, rehabilitation and construction of a new multipurpose community center1,300,000
(C) Acquisition, construction and rehabilitation of several properties located on Allegheny Street in the Huntingdon Borough Historic District2,000,000
(iii) Shirley Township
(A) Site preparation and infrastructure for back lot development of Riverview Business and Industrial Park750,000
(B) Infrastructure improvements to the Riverview Business Center1,100,000
(iv) Smithfield Township
(A) Land acquisition and site development of a property located east of Giant Food Stores along Route 22525,000
(B) ((B) repealed Oct. 19, 2010, P.L.573, No.82)
(v) Spruce Creek Township
(A) Infrastructure, construction and rehabilitation to upgrade facilities at the Union Furnace Quarry5,000,000
(32) Indiana County
(i) County projects
(A) Renovation of historical covered bridges, including acquisition, construction and other related costs1,000,000
(B) Acquisition, infrastructure, construction and other related costs for the development of a multitenant business facility4,000,000
(C) Acquisition, infrastructure, construction and other related costs for the development of a business/industrial park5,000,000
(D) Land acquisition, remediation, site preparation, infrastructure improvements, construction and other related costs for the redevelopment and revitalization of brownfield sites located along Wayne Avenue and 13th Streets8,000,000
(E) Land acquisition, engineering, site preparation, infrastructure, construction and other related costs for the Vinegar Hill Steps and Water Street Wall project, including required safety improvements to North 7th Street2,000,000
(F) Building improvements, renovations and other related costs for athletic complex improvements at Indiana Area School District schools1,000,000
(G) Development of a new emergency services communications system, including land acquisition, site development and equipment purchases8,000,000
(H) Renovation and construction of a patient tower and related facilities, including equipment acquisition for the Indiana Regional Medical Center10,000,000
(i.1) Blairsville Borough
(A) Infrastructure and building improvements, including streetscape and other related costs for downtown redevelopment projects4,000,000
(ii) Burrell Township
(A) Land acquisition, site preparation and construction related to development of ambulatory care center at Indiana Regional Medical Center5,000,000
(B) Expansion of the Interchange Center multitenant building, including construction, land acquisition and other related costs2,000,000
(C) Redevelopment of Corporate Campus Business Park, including acquisition, construction, infrastructure and other related costs3,000,000
(iii) Indiana Borough
(A) Redevelopment, construction, and infrastructure improvements along Philadelphia Street and 7th Street5,000,000
(iii.1) Homer City
(A) Construction, land acquisition and other related costs for Homer-Center Community Center1,500,000
(iv) White Township
(A) Expansion of the Indiana Regional Medical Center, including construction and related infrastructure1,000,000
(B) Construction of an agricultural multitenant building, including land acquisition, site preparation and other related costs3,000,000
(C) Redevelopment, construction and infrastructure improvements along Wayne Avenue and 13th Street4,000,000
(D) Renovation of the Mack Park Recreation Complex, including construction, infrastructure and other related costs3,000,000
(E) Acquisition, construction and related infrastructure for the development of the Windy Ridge Business Park4,000,000
(F) Construction of a medical-model wellness center at Indiana Regional Medical Center, including acquisition, infrastructure and other related costs2,000,000
(G) Acquisition, infrastructure, construction and other related costs for the development of a multitenant business facility2,000,000
(v) Center Township
(A) Acquisition, infrastructure, construction and other related costs for the development of a multitenant business facility4,000,000
(33) Jefferson County
(i) County projects (Reserved)
(i.1) Brockway Borough
(A) Infrastructure, construction, rehabilitation and other costs related to renovations to the Taylor Memorial Park Swimming Pool, including necessary ADA compliance modifications550,000
(ii) Brookville Borough
(A) Patient care improvements, including equipment acquisition for Brookville Hospital750,000
(iii) Jefferson County Development Council, Inc.
(A) Jefferson County Enterprise Park II, development of approximately 90 acres of vacant land located near I-80, exit 73 for a business park, including land acquisition and water, sewer and roadway infrastructure1,000,000
(iv) North Central Regional Planning and Development Corporation
(A) Redevelopment of a 30-acre brownfield site formerly occupied by the Brockway Clay Plant for a business commerce park, including land acquisition, construction of a rail spur and water, sewer and roadway infrastructure1,000,000
(v) Punxsutawney Borough
(A) Acquisition and demolition of blighted property for borough redevelopment500,000
(vi) Punxsutawney Regional Development Corporation
(A) Riker's yard industrial site, development of 80 acres of vacant land for industrial purposes, including land acquisition and water, sewer and roadway infrastructure1,500,000
(B) Facility improvements and upgrades, including the replacement of emergency power generation equipment, information technology necessary to support patient care and safe medication administration at Punxsutawney Area Hospital600,000
(C) Improvement, rehabilitation and renovation of the medical/surgical inpatient unit, including information technology enhancements necessary for a facility-wide transition to electronic health records and patient-focused care philosophy at Punxsutawney Area Hospital2,500,000
(34) Juniata County (Reserved)
(35) Lackawanna County
(i) County projects
(A) Construction of North Pocono Area Community Center2,000,000
(B) Land acquisition, infrastructure improvements and construction of recreational and athletic field facilities along Route 6, Lackawanna College3,000,000
(C) Construction and other related costs for additional improvements to Archbald Pothole State Park1,500,000
(D) Acquisition, construction and other costs related to a new trail along the Lackawanna River3,000,000
(E) Construction and other costs related to building a Keystone College computer and business building7,000,000
(i.1) Archbald Borough
(A) Construction, renovations and expansion to the Northeastern Educational Intermediate Unit building2,000,000
(i.2) City of Carbondale
(A) Acquisition, infrastructure improvements and other costs related to the construction of the Anthracite Historical Discovery Center2,000,000
(i.3) Clarks Green Borough, Clarks Summit Borough, Glenburn Township and South Abington Township
(A) Infrastructure improvements and construction of the Abington Area Community Park8,344,000
(i.4) Covington Township
(A) Construction, redevelopment and other related costs for the North Pocono High School Health and Wellness Center4,000,000
(ii) Dunmore Borough
(A) Construction and other costs related to building the Dunmore Fire Station1,400,000
(B) Construction, infrastructure, redevelopment and other costs related to building the Dunmore High School Health and Fitness Center1,000,000
(ii.1) Jessup Borough
(A) Construction of technology facility building within the Jessup Small Business Center/Valley View Business Park2,750,000
(ii.2) Moosic Borough
(A) Acquisition, infrastructure improvements, developments and construction of Lackawanna County Baseball Stadium and adjacent property35,000,000
(ii.3) Old Forge Borough
(A) Construction, redevelopment and other related costs for Old Forge Community Center and Park improvements2,000,000
(ii.4) Scott Township
(A) Construction, redevelopment and other related costs for the Lakeland High School Health and Wellness Center2,000,000
(iii) City of Scranton
(A) Acquisition and other costs related to providing the Vocational Services Community Employment Program and Sheltered Workshop1,000,000
(B) Construction, infrastructure, redevelopment and other costs related to the West Scranton Revitalization Project3,000,000
(C) Construction, redevelopment and other costs related to the Nay Aug Zoo renovation and addition10,000,000
(D) Construction for the expansion of Johnson College1,985,000
(E) Infrastructure improvements and construction of the Marywood University athletic field facility1,000,000
(F) Acquisition, infrastructure improvements and construction of a parking garage for the Commonwealth Medical College10,000,000
(G) Acquisition and construction for film production facility6,000,000
(H) Acquisition, infrastructure improvements and construction of Scranton Public Library7,500,000
(I) Acquisition, infrastructure improvements, construction and related costs for a new science center and academic facilities for the University of Scranton37,500,000
(J) Acquisition, infrastructure improvements, construction and related costs for an athletic complex and related facilities for the University of Scranton10,000,000
(K) Acquisition, infrastructure improvements, construction and related costs for the Mulberry Street improvement project at the University of Scranton1,500,000
(L) Construction, redevelopment and other costs related to the refurbishment of the Lackawanna County Courthouse7,000,000
(M) Acquisition, infrastructure improvements, construction and other costs related to the Technology Office building project4,000,000
(N) Acquisition, infrastructure improvements, construction and other costs related to the Timmy's Town Center Children's Museum project5,000,000
(O) Construction of the Friendship House Autism Treatment Facility1,400,000
(P) Construction and other related costs to rebuild facilities at Scranton's farmer's market and Albright Avenue1,500,000
(iv) South Abington Township
(A) Acquisition, redevelopment and costs associated with building the South Abington Township Community Center1,200,000
(v) Throop Borough
(A) Construction, redevelopment and other costs related to renovation of Throop Hose Company No. 32,000,000
(B) Construction, acquisition and other costs related to Throop Borough Building renovations and additions1,260,000
(36) Lancaster County
(i) County projects
(A) Acquisition, infrastructure, renovations, construction and other related costs for the development of a community health center at Lancaster General Hospital2,500,000
(B) Acquisition, infrastructure, renovations, construction and other related costs for the Historic Preservation Trust of Lancaster County for the Stevens-Smith Historic Site project6,000,000
(C) Design, infrastructure, construction and other related costs for the development of a Campus of History for the Lancaster County Historical Society9,000,000
(D) Acquisition, design, infrastructure, construction and other related costs of building a new facility, including a planetarium and exhibits at the North Museum of Natural History and Science3,000,000
(E) Site preparation, infrastructure, construction and other related costs for the Crossings at Conestoga Creek project, including construction of an innovative storm water management and wetland enhancement facility10,000,000
(F) Additional funds for the completion of the redevelopment of the historic Watt & Shand Department Store as part of the Lancaster County Convention Center/Hotel project6,000,000
(G) Acquisition, construction, infrastructure and other related costs to renovate outdoor recreation facilities5,000,000
(H) Acquisition, construction, infrastructure and other related costs for new county jail25,000,000
(I) Acquisition, construction, infrastructure and other related costs for a children and youth facility5,000,000
(J) Construction, infrastructure and other related costs to renovate county office buildings, including the 40 East King Street facility10,000,000
(K) Construction, infrastructure and other related costs to renovate the county courthouse and restore the old county courthouse10,000,000
(L) Acquisition, construction, infrastructure and other related costs for a new forensic center5,000,000
(M) Construction and related costs for the Conestoga Valley School District Environmental Center1,000,000
(ii) City of Lancaster
(A) Construction and other related costs for the Thaddeus Stevens Technology Center4,000,000
(B) Infrastructure and other costs associated with Lancaster wireless access1,000,000
(C) Infrastructure and equipment to support a network of public safety surveillance cameras throughout the City of Lancaster for the Lancaster Community Safety Coalition600,000
(D) Construction, infrastructure and other related costs to expand, improve and update facilities at the Lancaster Public Library3,500,000
(E) Acquisition, infrastructure, demolition and other related costs for the construction of a new facility located within the James Street Improvement District for the Lancaster YMCA6,000,000
(F) Redevelopment Authority of the City of Lancaster, for restoration of the historic Montgomery House located in downtown Lancaster1,250,000
(G) Acquisition, construction and other related costs for the Lancaster County Performing Arts Center project15,000,000
(H) Acquisition, renovation and rehabilitation of a former warehouse facility for Manos House, a nonprofit drug and alcohol rehabilitation services organization, for reuse as a residential drug and alcohol rehabilitation program and independent living facility1,000,000
(I) Construction and other related costs for the Conestoga Plaza project5,000,000
(J) Acquisition, demolition, construction, environmental remediation, infrastructure and other related costs for the Northwest Gateway development project, including health care facilities and railroad relocation costs20,000,000
(K) Construction and other related costs for the Pennsylvania Academy of Music improvements15,000,000
(L) Acquisition, infrastructure, construction and other related costs for the development of a transit revitalization investment district in the vicinity of the Lancaster Train Station15,000,000
(iii) Columbia Borough
(A) Acquisition and renovation of Center for Brain Injured Children at the Lazarus Foundation913,000
(B) Acquisition, infrastructure, rehabilitation and construction of the Columbia Fireman's Museum, an interactive firehouse museum4,625,000
(C) Acquisition, infrastructure, site development, construction and other costs for the renovation and development of the former Ashley and Bailey Silk Company silk mills property located at the intersection of North 4th Street and Linden Street1,000,000
(iii.1) Elizabethtown Borough
(A) Site development, infrastructure improvements, construction and renovation of athletic facilities at Elizabethtown College3,000,000
(B) Site development, infrastructure improvements, construction and renovation of an instructional classroom building for Elizabethtown College3,000,000
(C) Site development, infrastructure improvements, construction and reconstruction of a weir at Elizabethtown College1,500,000
(iv) Ephrata Borough
(A) Redevelopment of Mountain Springs Hotel property, including related infrastructure500,000
(v) Ephrata Township
(A) Infrastructure, construction and other related costs of converting 50.8 acres of land into a community recreational park1,530,000
(vi) New Holland Borough
(A) Redevelopment of historic building on Main Street, including related infrastructure500,000
(B) Acquisition, infrastructure, development and construction on an East Main Street vacant parcel for the New Holland Farmers Fair Association Exhibit Hall project600,000
(vii) East Cocalico Township
(A) Acquisition, infrastructure, rehabilitation and construction of a community center on North Reading Road4,000,000
(viii) East Lampeter Township
(A) Infrastructure, construction and other related costs for improvements to the Strasburg Pike frontage of the Flory Park development project500,000
(ix) Honey Brook Township
(A) Acquisition, infrastructure and construction of a new municipal building1,850,000
(x) Manheim Borough
(A) Renovations to the Manheim Borough office building, consisting of construction of handicap accessibility1,300,000
(xi) Mount Joy Borough
(A) Infrastructure, rehabilitation and construction of a satellite branch YMCA facility4,000,000
(xii) Warwick Township
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs of converting 5.5 miles of the former Reading and Columbia Railroad corridor into a linear trail875,000
(B) Rehabilitation and expansion of the Lititz Recreational Center700,000
(37) Lawrence County
(i) County projects
(A) Construction, acquisition, infrastructure, redevelopment and other costs related to the Lawrence County South Central Route 18 Development District12,000,000
(B) Construction, acquisition, infrastructure, redevelopment and other costs related to the Central Lawrence County Route 422 Corridor Development Area8,000,000
(i.1) Ellwood Borough
(A) Acquisition, demolition, infrastructure improvements, construction and other costs related to the Ellwood Borough Downtown Revitalization project10,000,000
(ii) Elwood City Borough
(A) Acquisition, construction, infrastructure and other related costs for the Ellwood Borough East Commerce Park10,000,000
(B) Construction, infrastructure and other costs related to school and community athletic facilities improvements1,000,000
(C) Acquisition, construction, infrastructure, redevelopment and other costs related to Ellwood City Revitalization and Economic Development project4,000,000
(ii.1) City of New Castle
(A) Acquisition, infrastructure improvements and construction for the Downtown Revitalization project10,000,000
(iii) New Wilmington Borough
(A) Acquisition, construction, infrastructure and other costs related to the rehabilitation of downtown New Wilmington1,500,000
(iv) Shenango Township
(A) Acquisition, demolition, infrastructure improvements, construction and other costs related to the Big Run Commerce Park project5,000,000
(v) Wampum Borough
(A) Construction, infrastructure and other costs related to Wampum Borough downtown improvements and revitalization1,000,000
(38) Lebanon County
(i) County projects (Reserved)
(ii) City of Lebanon
(A) Acquisition, construction, infrastructure and other related costs for downtown urban corridor revitalization10,000,000
(iii) South Lebanon Township
(A) Redevelopment of police department facilities, including construction and related infrastructure565,000
(39) Lehigh County
(i) County projects
(A) Infrastructure, design and other related costs to the transitioning to a high-performance emergency services program5,000,000
(B) Lehigh Valley Economic Development Corporation
(I) Infrastructure and rehabilitation of an assistive technology incubator center7,000,000
(II) Infrastructure, construction and rehabilitation of the downtown Americus Center15,000,000
(C) Infrastructure, construction and other related costs of a waterfront development on Front Street between Bucky Boyle Park and the Transportation Museum28,000,000
(D) Acquisition and renovations of a facility to be used as a therapeutic community dedicated to providing addiction and mental health treatment for veterans1,250,000
(E) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants1,000,000
(F) Rehabilitation and redevelopment of a building for the purposes of an Association for Blind and Visually Impaired program expansion to fully integrate a one-stop low vision center, a fully equipped aids and devices store and a state-of-the-art technology center725,000
(ii) City of Allentown
(A) Construction, redevelopment and other costs associated with expansion and renovation of Lehigh Valley Hospital1,000,000
(B) Acquisition, redevelopment, streetscape improvement and other costs related to the 7th Street Property Acquisition and Beautification Project3,000,000
(C) Acquisition, redevelopment and other costs related to the Americus Design Center5,000,000
(D) Acquisition, redevelopment and other costs associated with building the Allentown Conference/Convention Center5,000,000
(E) Acquisition, park land reclamation and other costs related to the St. Elmo Park Development3,000,000
(F) Acquisition, redevelopment and other costs associated with the Performing and Visual Arts Center7,000,000
(G) Demolition of Sals Restaurant and construction of a new upscale restaurant500,000
(H) Acquisition, infrastructure, renovation and redevelopment of several properties in Old Allentown into artist lofts500,000
(I) Acquisition of land and construction of a park on a St. Elmo Street lot500,000
(J) Construction, renovations and redevelopment of the former Schoens Furniture store into Class A offices, retail and lofts1,000,000
(K) Acquisition, infrastructure, renovations and redevelopment for the purposes of creating a downtown cultural arts district1,000,000
(L) Acquisition, infrastructure, renovations and redevelopment of the 7th Street Commercial Corridor1,000,000
(M) Acquisition, infrastructure, redevelopment and construction of homeownership units located within the historic Old Allentown neighborhood1,000,000
(N) Acquisition, infrastructure, demolition, renovations and redevelopment of buildings around new museum and creation of river walk and marina at Lehigh Landing, Phase II1,500,000
(O) Acquisition, infrastructure, renovation and redevelopment of 26 acres located on the Lehigh Structural Steel site for mixed-use purposes for Waterfront Commons, Phase I2,000,000
(P) Acquisition, infrastructure, construction and redevelopment of the Hanover Acres site and properties along Hanover Street for Overlook Park, Phase II2,000,000
(Q) Infrastructure, renovation and redevelopment of key downtown neighborhoods for Old Allentown neighborhood revitalization project2,000,000
(R) Acquisition, construction and other related costs to redevelop the Fairgrounds Farmers Market and 19th Street2,000,000
(S) Construction, infrastructure and other related costs to develop the citywide security camera and shot spotter program to improve safety and increase economic development2,000,000
(T) Acquisition and redevelopment of a 26-acre urban brownfield site into a waterfront community2,500,000
(U) Infrastructure, construction and redevelopment of the Lehigh Landing office development for Lehigh Landing, Phase I2,500,000
(V) Construction and renovations to the historic Civic Theatre5,000,000
(W) Construction, renovations and redevelopment of the Americus Hotel into a mixed-use facility5,000,000
(X) Infrastructure, construction and redevelopment of vacant parking lots and underutilized buildings along 7th Street in downtown Allentown5,000,000
(Y) Acquisition, infrastructure, renovation and redevelopment of the Downtown Post Office to a state-of-the-art visual arts center7,000,000
(Z) Acquisition, infrastructure, renovations and redevelopment of a new downtown executive conference center next to Crowne Plaza7,000,000
(AA) Infrastructure, construction and other related costs for the Allentown Symphony Hall improvements project, including the construction of a performing arts center1,250,000
(BB) Acquisition, infrastructure, construction, redevelopment and other related costs for the relocation of the Casa Guadalupe Center500,000
(CC) Infrastructure, redevelopment and other costs related to Old Allentown streetscape improvements2,000,000
(DD) Acquisition, construction, infrastructure, redevelopment and other related costs for the CASA expansion project3,000,000
(EE) Acquisition, construction, infrastructure, redevelopment and other costs related to the Lehigh Valley Charter School for Performing Arts5,000,000
(FF) Acquisition, construction, infrastructure and other costs related to the expansion of the Police Academy5,000,000
(GG) Acquisition, construction, infrastructure, redevelopment and other related costs for the expansion of the Central Catholic High School and Nursing School project10,000,000
(HH) Construction, infrastructure, redevelopment and other related costs for the Lehigh Valley Multipurpose Community Arena40,000,000
(II) Construction and other related costs for renovation of existing commercial space for a restaurant2,000,000
(iii) City of Bethlehem
(A) Construction and other related costs for the renovation and expansion of the Lehigh Valley Hospital-Muhlenberg5,000,000
(B) Acquisition, infrastructure improvements, renovations and construction of Martin Tower, former world headquarters of Bethlehem Steel10,000,000
(iii.1) Catasauqua Borough
(A) Construction of emergency services building1,600,000
(iv) Emmaus Borough
(A) Construction and acquisition of Emmaus Main Street Parking Deck5,000,000
(B) Construction and acquisition of Emmaus Main Street Community Center3,000,000
(C) Triangle Project, Phase II, redevelopment of downtown, including necessary costs500,000
(v) Lower Macungie Township
(A) Acquisition, construction, infrastructure and other related costs for a new Lower Macungie Fire Department Fire Station2,000,000
(v.1) Upper Macungie Township
(A) Construction and related costs for the Cycling Hall of Fame and Museum5,000,000
(v.2) Macungie Borough
(A) Acquisition of land adjacent to Macungie Memorial Park across Swabin Creek, with construction and installation of a first bridge across the creek and recreational equipment improvement800,000
(v.3) North Whitehall Township
(A) Construction of four athletic fields2,200,000
(B) Acquisition, infrastructure improvements, renovations and construction of Camp Fowler3,000,000
(vi) Salisbury Township
(A) Acquisition, construction, infrastructure and other related costs for the Emergency Department and Imaging Department expansion at Lehigh Valley Hospital and Health Network5,300,000
(vi.1) Slatington Borough
(A) Acquisition, construction, infrastructure and other related costs for a Main Street Park285,000
(vii) Upper Saucon Township
(A) Construction, infrastructure and related costs for the Gambet Center for Innovation and Global Competitiveness4,000,000
(B) Construction of a baseball stadium at DeSales University1,750,000
(C) Construction of the McShea Student Union Center at DeSales University7,500,000
(viii) North Whitehall Township
(A) Construction and redevelopment of four state-of-the-art athletic fields for use by Lehigh Carbon Community College students and community youth groups2,112,000
(40) Luzerne County
(i) County projects
(A) Acquisition, infrastructure, construction and other related costs for the development of The Lands at Hillside Farms, a multitenant, mixed-use community located in Jackson and Kingston Townships4,000,000
(ii) Ashley Borough
(A) Construction, infrastructure and other related costs for the Ashley Lane Project500,000
(B) Acquisition, construction and other related costs for the Mill Street Mill Project500,000
(ii.1) Butler Township and Conyngham Borough
(A) Acquisition, construction, redevelopment and other related costs for the Valley Regional Fire and Rescue Firehouse500,000
(iii) City of Nanticoke
(A) Acquisition, construction, infrastructure and other related costs for mixed-use development on East Main Street1,000,000
(B) Construction, infrastructure and other related costs for the Luzerne County Community College Public Safety Institute35,447,000
(C) Construction and other related costs for downtown parking expansion2,000,000
(D) Acquisition, construction, infrastructure and other related costs for Luzerne County Community College student housing2,000,000
(E) Construction, infrastructure, redevelopment and other costs related to new housing at Susquehanna Coal Building500,000
(F) Acquisition, construction and other related costs for the Lower Broadway Park multi-use project1,000,000
(G) Acquisition, construction, infrastructure and other related costs for the Luzerne County Community College Culinary Arts Building with parking3,000,000
(H) Construction and related costs for the Kanjorski Building Health Sciences Center at Luzerne Community College2,352,000
(iv) City of Wilkes-Barre
(A) Acquisition, construction, infrastructure and other related costs for the revitalization of the 100 block of South Main Street13,000,000
(B) Construction, infrastructure and other related costs for the renovation of the public square1,500,000
(C) Construction, infrastructure and other related costs for the redevelopment of the Kirby Park recreation area750,000
(D) Construction, infrastructure, redevelopment, abatement of hazardous materials and other costs related to building the Irem Temple Mosque10,000,000
(E) Construction, infrastructure, abatement of hazardous materials and other costs related to Impact Wilkes-Barre5,000,000
(F) Construction, infrastructure, acquisition, abatement of hazardous materials, redevelopment and other costs related to Impact Wilkes-Barre3,000,000
(G) Construction, infrastructure, acquisition, abatement of hazardous materials, redevelopment and other costs related to Downtown Wilkes-Barre Revitalization Phase II15,000,000
(H) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other costs related to Hanover Industrial Estates1,000,000
(I) Acquisition, construction, infrastructure and other related costs for a mixed-use facility at the Murray Complex10,000,000
(J) Construction, infrastructure and other related costs for the Coal Street Park Office Complex7,000,000
(K) Acquisition, construction, infrastructure and other related costs for an intermodal transportation facility4,000,000
(L) Construction, infrastructure and other related costs for the Coal Street Park Regional Sports Complex8,000,000
(M) Construction and other related costs for the redevelopment of the Murray Courtwright Complex5,000,000
(N) Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other associated with the West Market Street Mixed-Use Revitalization Project5,000,000
(O) Construction, infrastructure improvements, abatement of hazardous materials and construction for parking facilities in downtown Wilkes-Barre5,000,000
(P) Acquisition, demolition, construction, infrastructure and other related costs for a mixed-use project at North Main and North Streets5,000,000
(Q) Acquisition, infrastructure improvements, construction and other related costs for the North Branch Library of the Osterhout Free Library project1,500,000
(R) Construction, infrastructure and redevelopment for the Market Street Square Train Station3,500,000
(S) Acquisition, construction, infrastructure and other related costs for the Wilkes University Law School10,000,000
(iv.1) Dallas Borough
(A) Acquisition, construction, infrastructure and other costs related to the expansion of Back Mountain Cultural Arts Center500,000
(B) Acquisition, infrastructure, construction, renovations and other related costs for a health science facility at Misericordia University2,750,000
(iv.2) Dallas Township
(A) Infrastructure, rehabilitation and construction of a multicommunity indoor athletic facility500,000
(B) Acquisition, infrastructure, construction and other related costs for a community recreation and athletic facility500,000
(v) Hanover Township
(A) Construction, acquisition, infrastructure, redevelopment and other costs related to Hanover Crossings Phase III and IV4,000,000
(vi) Hazle Township
(A) Acquisition, construction, infrastructure and other related costs for the development of a cargo airport250,000,000
(B) Acquisition, construction, infrastructure and other costs related to the Route 424 extension project5,000,000
(vi.1) City of Hazleton
(A) Construction, infrastructure and other costs related to the Hazleton Elementary-Middle School Castle Auditorium1,000,000
(vii) Kingston Borough
(A) Construction and other related costs for the Hoyt Library Construction Project1,500,000
(B) Renovation, construction, infrastructure and related costs for elementary, middle and high school projects for Wyoming Valley West School District46,500,000
(C) Infrastructure, construction, renovations and other related costs for improvements to the Wyoming Seminary campus1,450,000
(viii) Lehman Township
(A) Infrastructure, rehabilitation and construction of a multicommunity indoor athletic facility500,000
(B) Infrastructure, construction and other related costs for an indoor community health center and recreation and athletic facility500,000
(ix) Plains Township
(A) Birchwood Park improvement project319,000
(x) Pittston
(A) Infrastructure improvements and construction for Center Point East Phase III project7,900,000
(B) Infrastructure improvements and construction for Center Point South project2,400,000
(C) Infrastructure improvements and construction for Center Point West project3,850,000
(D) Acquisition, demolition, infrastructure, construction and related costs for the downtown Pittston redevelopment project10,000,000
(E) Construction and infrastructure for security control center for Pittston Area School District635,000
(F) Acquisition and construction for the Northeastern Pennsylvania Regional Nonprofit Service Center2,000,000
(xi) Wilkes-Barre Township
(A) Construction and other related costs for the renovation of the township municipal building500,000
(B) Construction and other related costs for the township police building800,000
(xii) Wright Township
(A) Construction, infrastructure, abatement of hazardous materials, redevelopment and other costs related to Crestwood Industrial Park2,500,000
(41) Lycoming County
(i) County projects
(A) Acquisition, construction, infrastructure and other related costs for the Williamsport Crosscutter's Stadium project15,000,000
(B) Design and construction of a rail spur to support the economic development of the New Muncy Industrial Park Phases II, III and IV1,000,000
(C) Design, infrastructure, construction and other related costs for the development of Phase IV of the Muncy Industrial Park1,000,000
(D) Design, construction and other related costs to provide water, sewer and road infrastructure within Timber End Park, a 226-acre designated Keystone Opportunity Zone1,000,000
(E) Construction of rail spurs and related track work to provide rail service to industrial sites for expansion of Muncy Industrial Park, Industrial Properties Corporation3,000,000
(F) Infrastructure site improvements, construction and other necessary costs for a new Army/Reserve center1,500,000
(ii) City of Williamsport
(A) Redevelopment and expansion of Susquehanna Health Hospital, including acquisition10,000,000
(B) Acquisition, construction, infrastructure and other related costs for the revitalization of Textron Lycoming facilities10,000,000
(C) Design and construction of a new intermodal facility, including related infrastructure for the Church Street Transportation Center4,000,000
(D) Infrastructure, redevelopment, construction and other related costs for the improvement and expansion of the Reach Road Industrial Park1,250,000
(iii) Clinton Township
(A) Acquisition, construction, infrastructure and other related costs for the White Deer Recreation Complex1,000,000
(iv) Jersey Shore Borough
(A) Redevelopment of the Jersey Shore YMCA, including construction and related infrastructure1,500,000
(B) Expansion of existing Department of Conservation and Natural Resources Pine Creek Rail-Trail, including necessary costs1,000,000
(v) Muncy Township
(A) Infrastructure within Phase IV of the Muncy Industrial Park1,000,000
(B) Acquisition, construction, infrastructure and other related costs for the Eastern Lycoming County Senior Center500,000
(C) Construction, infrastructure and other related costs for the Halls Station Water Phase I Plus4,000,000
(42) McKean County
(i) County projects
(A) Impact Kane, redevelopment, rehabilitation, construction and land acquisition necessary for a comprehensive economic development/community development initiative for municipalities located along the Route 6 corridor10,000,000
(B) Infrastructure and other related costs associated with the addition of the state-of-the-art 63-slice CT scanner that provides the only significant diagnostic capability of its kind in the region for Bradford Regional Medical Center700,000
(C) Acquisition and infrastructure related to the construction of the Route 219 Visitor/Discovery Center8,200,000
(i.1) McKean County Industrial Development Authority
(A) Acquisition, infrastructure and other related costs for the University of Pittsburgh at Bradford and the McKean County Industrial Development Authority development initiative, including renovation and rehabilitation of existing facilities and construction of new facilities10,000,000
(ii) City of Bradford
(A) Recreational facility improvements, including the renovation of the Kessel Athletic Complex, construction of a new urban trail system and improvements and repairs to the ice rink facility located in Callahan Park5,000,000
(B) Downtown redevelopment, including the renovation of two major downtown buildings, gateway entrance and downtown streetscape improvements and the revitalization of a city neighborhood through property acquisition, demolition, redevelopment and related infrastructure improvements5,000,000
(iii) Foster Township
(A) Environmental mitigation and infrastructure improvements, including the installation of new utilities and roadways at Lafferty Hollow Industrial Park1,500,000
(iv) Kane Borough
(A) Construction of a state-of-the-art Women's Diagnostic Breast Center, including infrastructure improvements at Kane Community Hospital1,600,000
(43) Mercer County
(i) County projects
(A) Infrastructure improvements and utility extensions within the Reynolds East Business Park, a Keystone Opportunity Expansion Zone, as part of the Phase II redevelopment project600,000
(B) Construction of a new Magisterial District Court facility along Barkeyville Road in Pine Township625,000
(C) Construction of a new, modern, multitenant building in the Reynolds East Business Park, a Keystone Opportunity Expansion Zone1,000,000
(ii) City of Sharon
(A) Acquisition, construction, infrastructure and other related costs for downtown Sharon revitalization3,000,000
(iii) City of Hermitage
(A) Construction, infrastructure and other costs associated with the Buhl Park Community Center renovation3,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other related costs for the city's town center development5,000,000
(iv) Greenville Borough
(A) Redevelopment of various industrial properties, including construction3,000,000
(B) Construction costs related to the expansion of the Greenville Borough building625,000
(C) Infrastructure, rehabilitation, construction and other related costs for Thiel College Academic Center project2,500,000
(D) Infrastructure, rehabilitation, construction and other related costs for the Thiel College Passavant Center project2,500,000
(v) Springfield, Findley and East Lackawannock Townships
(A) Construction, infrastructure, redevelopment and other related costs for the Mercer County Industrial and Business Park8,000,000
(44) Mifflin County
(i) County projects (Reserved)
(ii) Granville Township
(A) Infrastructure, construction and other related costs for improvements and expansion of the Granville Township sewage treatment facilities directly related to the Mifflin County Industrial Park expansion project5,000,000
(iii) Mifflin County Industrial Development Corporation
(A) Construction and infrastructure for mixed-use development of 162 acres along Route 322 near the Burnham Interchange5,000,000
(B) Acquisition, construction, infrastructure and redevelopment of a 316-acre expansion to Mifflin County Industrial Park, including access road, water, sewer, gas, electric, railroad and fiber-optic extension and connections10,000,000
(C) Renovations, including remediation, building redevelopment and infrastructure improvements in the Mifflin County Industrial Development Corporation Plaza, a brownfield site5,000,000
(D) Acquisition and preparation for redevelopment of blighted properties within the designated Elm Street section of Lewistown Borough1,000,000
(E) Acquisition, extension of infrastructure and roads and building redevelopment of the former Case New Holland facility5,000,000
(45) Monroe County
(i) County projects
(A) Acquisition, construction, infrastructure and other related costs for the East Stroudsburg School District Memorial Stadium1,870,000
(B) Acquisition, infrastructure improvements and construction of the Monroe County Family Health Center2,000,000
(C) Acquisition, construction and other related costs for the Pocono Mountains Wayfinding Program, consisting of a network of directional signs to guide the traveling public1,000,000
(D) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants1,000,000
(ii) Coolbaugh Township
(A) Acquisition, construction, infrastructure and other related costs for the Pocono Mountain Public Library Building1,000,000
(B) Acquisition, construction, infrastructure and other related costs for the Pocono Mountains Corporate Center East4,000,000
(C) Acquisition, construction, infrastructure and other related costs for the Commerce Court Extension1,250,000
(D) Acquisition, construction, infrastructure and other related costs for the Pocono Mountain Economic Development Rail Served Business Park2,000,000
(ii.1) Delaware Water Gap Borough
(A) Restoration of the Delaware Water Gap Railroad Station500,000
(B) Restoration, infrastructure improvements and construction of the Castle Inn1,000,000
(C) Restoration, infrastructure improvements and construction of the Laird Technology Building6,000,000
(ii.2) Delaware Water Gap Borough, East Stroudsburg Borough, Stroudsburg Borough, Smithfield Township and Stroud Township
(A) Infrastructure improvements for telecommunications for business sites2,000,000
(iii) East Stroudsburg Borough
(A) Infrastructure and other related costs to renovate East Stroudsburg High School Memorial Stadium3,000,000
(B) Demolition and construction of the International Boiler Works buildings1,800,000
(iv) East Stroudsburg Township
(A) Acquisition, construction, infrastructure and other related costs for a parking garage adjacent to Pocono Medical Center10,000,000
(B) Construction of Computer Security Research Center at East Stroudsburg University Research and Technology Park2,000,000
(C) Construction and infrastructure improvements for the World-Class Synchronous Data Center3,000,000
(v) East Stroudsburg, Stroudsburg and Middle Smithfield Townships
(A) Acquisition, construction, infrastructure and other related costs for rehabilitation of East Stroudsburg to Delaware Water Gap Rail Line1,250,000
(vi) (Reserved)
(vii) Paradise Township
(A) Acquisition of a fish hatchery for a park and educational center1,500,000
(viii) Pocono, Paradise and Jackson Townships
(A) Construction of bathrooms for persons with disabilities, field improvements and related infrastructure for Challenger Program100,000
(ix) Smithfield Township
(A) Construction, acquisition, infrastructure, redevelopment and other costs related to the Pocono Mountains Regional Convention Center37,500,000
(B) Acquisition, infrastructure improvements and construction of the Westfield Medical Center project2,500,000
(C) Acquisition and other costs related to the Viewscape Preservation project on Mosiers Knob Road2,000,000
(D) Construction and other related costs for a new municipal complex500,000
(x) Stroudsburg Borough
(A) Acquisition, restoration and expansion of the Sherman Theater3,000,000
(B) Acquisition and renovations to downtown Stroudsburg Hotel and construction of associated parking garage5,000,000
(C) Renovations of Ross-Stulgaitis Stadium1,000,000
(xi) Pocono Mountains Economic Development Corporation
(A) Telecommunications infrastructure projects in Middle Smithfield and Price Townships2,000,000
(B) Acquisition, infrastructure and other related costs for the redevelopment of sites on the west end of Monroe County2,500,000
(46) Montgomery County
(i) County projects
(A) Acquisition, construction, infrastructure and other related costs for the Montgomery County Expo Center19,000,000
(B) Infrastructure improvements and construction for the Manor College Dental Health Center500,000
(C) Abatement of hazardous materials, infrastructure, construction and other related costs for the redevelopment of the Bright Hope public housing facility, Montgomery County Housing Authority3,000,000
(D) Montgomery County Community College
(I) Roof replacement on 101 College Drive building500,000
(II) Exterior door replacements on central campus facilities135,000
(III) Construction of a walkway around the perimeter of central campus323,000
(IV) Renovations and other related costs for the relocation and expansion of the theater facility400,000
(ii) Abington Township
(A) Acquisition, construction and other related costs for the renovation of the Abington Community Center1,000,000
(B) Acquisition, construction and other related costs to develop a civic facility as part of the Roslyn Redevelopment Program12,000,000
(C) Construction and other related costs for the renovation of the Ardsley Community Center1,000,000
(iii) Ambler Borough
(A) Construction and other related costs for the redevelopment of Main Street10,000,000
(B) Construction, renovation, infrastructure and other related costs of a new firehouse2,000,000
(C) Acquisition, site preparation and other related costs for redevelopment of Keasbey and Mattison site, a residential development7,500,000
(D) Construction and renovations for the Keasbey and Mattison Boiler House project2,000,000
(iii.1) Bala Cynwyd
(A) Construction and land development project at 211 Belmont Avenue11,000,000
(iii.2) Bridgeport Borough
(A) Infrastructure improvements, construction and related costs associated with Bridgeview development4,500,000
(iii.3) Cheltenham Township
(A) Construction of expansion of Settlement Music School, including parking facility3,000,000
(B) Construction of bunker for McKinley Fire Company500,000
(C) Construction of bunker for LaMott Fire Company500,000
(D) Construction of patient center for Hope Lodge Cancer Facility1,200,000
(iii.4) Conshohocken Borough
(A) Infrastructure improvements and hazardous materials abatement for the Leeland Mansion project2,250,000
(iii.5) East Norriton Township
(A) Acquisition, construction, infrastructure, redevelopment and other costs related to the Innovative Life Sciences Center10,000,000
(B) Construction, acquisition, infrastructure, redevelopment and other related costs for a sustainable life sciences center10,000,000
(iii.6) Glenside
(A) Development, construction and other related costs for Arcadia University campus commons and parking facility2,000,000
(B) Infrastructure improvements and construction for the Arcadia University Student and Community Center project10,000,000
(C) Construction and other related costs for a new athletic field at Arcadia University500,000
(D) Construction and other related costs for a new academic building at Arcadia University4,500,000
(iv) Green Lane Borough
(A) Green Lane Borough sidewalk installation750,000
(v) Jenkintown Borough
(A) Construction and other related costs for the Southern Gateway multilevel parking garage6,000,000
(vi) Lansdale Borough
(A) Infrastructure and other related costs for the construction of a multipurpose senior community center1,000,000
(B) Construction of Phase II of the Lansdale Performing Arts Center, including additions and renovations to the former Masonic Hall3,300,000
(C) Construction and necessary costs for the PEAK Community Center4,500,000
(vii) Limerick Township
(A) Construction of a child-care center at the Spring Valley YMCA, including land acquisition2,500,000
(vii.1) Lower Gwynedd Township
(A) Construction, infrastructure and other costs associated with the Downtown Streetscape Improvement and Beautification project500,000
(vii.2) Lower Merion Township
(A) Infrastructure development and construction for 211 Belmont project4,000,000
(B) Acquisition, infrastructure improvements, construction and related costs for the Saint Joseph's University campuswide projects15,000,000
(C) Renovations and construction for Gladwyne Library2,000,000
(D) Acquisition, infrastructure, rehabilitation, construction and other costs related to the redevelopment of the Ardmore Train Station, including the abatement of hazardous materials15,000,000
(vii.3) Lower Pottsgrove Township
(A) Renovations, construction and other related costs for the rehabilitation of the Sunnybrook Ballroom and Convention Center3,000,000
(viii) Lower Providence Township
(A) Restoration of John James Audubon Center, including expansion, construction of a new museum and related infrastructure6,000,000
(B) Acquisition, redevelopment, construction and other related costs for the conversion of a brownfield site into a velodrome and events center10,000,000
(ix) Marlborough Township
(A) Acquisition, related infrastructure and restoration of Wetzel's Mill and Unami Creek Park area, including construction1,000,000
(x) Norristown Borough
(A) Acquisition, construction, infrastructure and other related costs for the Cultural Arts Center3,000,000
(B) Acquisition, redevelopment and construction of the Logan Square enterprise/redevelopment area10,000,000
(C) Acquisition, demolition, infrastructure improvements and construction of the Stoney Creek mixed-income housing development2,000,000
(D) Acquisition, infrastructure improvements and construction of the Nicolet complex3,500,000
(E) Land acquisition, infrastructure improvements and construction for the Riverfront Redevelopment District project5,000,000
(F) Redevelopment and revitalization of the Logan Square enterprise/redevelopment area10,000,000
(G) Acquisition, infrastructure improvements and other costs related to the Amatex/Norfab relocation and improvement project2,700,000
(x.1) Borough of Pottstown
(A) Acquisition and redevelopment of the former Bethlehem Steel site17,500,000
(B) Acquisition, redevelopment, construction and other related costs for the High and Evans Street property and Lessig Lot5,000,000
(xi) Pennsburg, Red Hill and Green Lane Boroughs and Marlborough and Upper Hanover Townships
(A) Construction, infrastructure, land acquisition and other related costs for the Greater Upper Perkiomen Valley Economic Development Project2,000,000
(xii) Red Hill Borough
(A) Expansion of Upper Perkiomen Valley Public Library, including infrastructure and other related costs1,000,000
(xii.1) Borough of Schwenksville
(A) Acquisition, infrastructure, construction and related costs for improvements and redevelopment on the east side of Main Street between Centennial Street and Perkiomen Avenue4,000,000
(xiii) Upper Hanover Township
(A) Acquisition, construction and related infrastructure for Upper Perkiomen Valley YMCA4,000,000
(B) Construction of outpatient medical facility and medical office building at St. Luke's Quakertown Hospital, including related infrastructure1,000,000
(xiv) Upper Merion Township
(A) Infrastructure improvements and construction for Corsair II5,000,000
(B) Acquisition, construction, infrastructure, redevelopment and other costs related to the Upper Merion Recreational Facility4,000,000
(xv) Upper Moreland Township
(A) Construction and development of a multipurpose, lighted synthetic turf athletic field500,000
(xvi) West Norriton Township
(A) Acquisition and related costs for the construction of the Audubon area YMCA3,000,000
(xvii) Montgomery County Industrial Development Authority
(A) Site preparation, construction and infrastructure improvements for economic development at Ruth and Clemens Roads, Lower Salford Township5,000,000
(B) Land acquisition, infrastructure and construction of a new ALMAC facility for economic development at Fretz and Wambold20,000,000
(xviii) Whitpain Township
(A) Construction, acquisition, infrastructure, redevelopment and other related costs for a community wellness center7,500,000
(47) Montour County
(i) County projects
(A) Acquisition and development of a county industrial park1,000,000
(B) Infrastructure, construction and other related costs for the development and construction of a new Geisinger Laboratory Medicine Building20,000,000
(C) Infrastructure, construction and other related costs for the development and construction of a new Geisinger Genomic Medicine Institute5,000,000
(ii) Danville Borough
(A) Land acquisition, infrastructure improvements and construction of a parking garage1,000,000
(48) Northampton County
(i) County projects
(A) Construction, redevelopment and other related costs to build the Steelstax Performing Arts and Broadcast Center/Events Center12,000,000
(B) Infrastructure improvements, renovations and construction for the Lehigh Heavy Forge Company industrial area10,000,000
(C) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants1,000,000
(D) Development, construction and other related costs for an ecomagination health care campus for St. Luke's Hospital and Health Network5,800,000
(ii) Pen Argyl Borough
(A) Infrastructure improvements and construction of Weona Park Pool and bath house facility10,000,000
(B) Land acquisition, infrastructure improvements and construction of a government center/fire station5,000,000
(C) Construction of a community center, including necessary costs5,000,000
(iii) Bangor Borough
(A) Acquisition, infrastructure improvements and construction of a garage and salt storage facility2,500,000
(B) Acquisition and construction of a municipal complex5,000,000
(C) Acquisition and renovations to the Colonial Hotel500,000
(D) Renovations of the Trust Building500,000
(iv) City of Bethlehem
(A) Construction of South Main Street parking garage5,000,000
(B) Construction of 4th and Broadway parking garage3,000,000
(C) Acquisition, infrastructure improvements and construction of the Farr Building1,000,000
(D) Renovations and construction of the Stock House Visitors Center1,000,000
(E) Renovations to the Fowler Family Southside Center, Northampton Community College1,000,000
(F) Infrastructure improvements and construction of Lehigh University science and technology infrastructure10,000,000
(G) Construction, redevelopment and other related costs to build a facility to employ persons with disabilities500,000
(H) Site improvement, renovation and expansion of incubator facility for Ben Franklin TechVentures7,500,000
(I) Construction for repair and restoration of South Bethelehem flood control system500,000
(J) Construction, infrastructure, environmental remediation, redevelopment and other related costs and improvements to the Majestic brownfields redevelopment project20,000,000
(v) Bethlehem Township
(A) Acquisition, infrastructure improvements and construction for the St. Luke's Riverside Health Campus15,000,000
(B) Renovations and infrastructure improvements to the boiler and cooling towers, Northampton Community College500,000
(C) Renovations and expansion of the automotive technology program facility, Northampton Community College1,000,000
(vi) City of Easton
(A) Acquisition, redevelopment and construction of a parking garage to serve the business district, Bushkill Creek and Lafayette College areas2,250,000
(B) Infrastructure, redevelopment and construction of a Northampton County Government Center parking garage3,500,000
(C) Renovation of a commercial facility and construction of exhibits for the Northampton County Historical and Genealogical Society Museum4,500,000
(D) Infrastructure, demolition, construction and other related costs for the Delaware Terrace and Delaware Terrace Annex Community Development project, consisting of rehabilitation of a blighted housing complex2,000,000
(E) Construction of a multilevel parking garage in the vicinity of the Northampton County Courthouse5,000,000
(vii) Glendon Borough
(A) Construction of infrastructure to serve industrial park and community development500,000
(viii) North Catasauqua Borough
(A) Renovations of Borough Hall Senior Center and community multipurpose facilities650,000
(ix) Palmer Township
(A) Acquisition, construction and other related costs for the National High School Sports Hall of Fame Museum5,000,000
(B) Infrastructure and construction of an interchange at the intersection of Route 33 and Main Street in Palmer Township14,000,000
(C) Site preparation, infrastructure and construction of facilities for commercial and industrial use15,000,000
(x) Wilson Borough
(A) Infrastructure, site preparation and remediation, rehabilitation and historic reconstruction for community development5,000,000
(B) Acquisition, infrastructure improvements and construction of Dixie Lofts5,000,000
(49) Northumberland County
(i) County projects
(A) Acquisition, infrastructure, construction and other related costs for the Mount Carmel Area Recreation Complex2,000,000
(i.1) City of Sunbury
(A) Acquisition, infrastructure, construction, equipment and other related costs for the construction of a new Emergency Department at the Sunbury Community Hospital5,000,000
(B) Acquisition, infrastructure, construction, equipment and other related costs for renovations to the Radiology Suite at the Sunbury Community Hospital3,000,000
(i.2) Coal Township
(A) Construction and other costs related to Shamokin Area Community Hospital improvements500,000
(ii) Milton Borough
(A) Acquisition, construction, infrastructure and other related costs for a new Milton Public Library1,000,000
(B) Infrastructure, rehabilitation and construction for improvements to Marsh Road in the vicinity of the Milton Area Industrial Park2,000,000
(iii) City of Shamokin
(A) Construction of a mining technology and training center2,000,000
(50) Perry County
(i) County projects (Reserved)
(ii) Penn Township
(A) Construction of new facility to house preschool program and after school program at the Early Education Center500,000
(iii) Spring Township
(A) Audubon Hawk Watch expansion, including construction of viewing area for persons with disabilities and related infrastructure improvements275,000
(51) Philadelphia County
(i) County projects
(A) Construction, infrastructure and other related costs for the expansion and rehabilitation of Children's Crisis Treatment Center4,000,000
(ii) City of Philadelphia
(A) Construction and other related costs for the University of Pennsylvania Research Center16,000,000
(B) Redevelopment and other costs related to the Mt. Airy Revitalization Corporation northwest neighborhood streetscape improvements1,500,000
(C) Construction, redevelopment and other costs associated with the Academy of Natural Science exhibit500,000
(D) Construction, infrastructure, redevelopment and other related costs to upgrade and renovate the Curtis Institute for Music20,000,000
(E) Construction and other related costs for the Nueva Jerusalem mixed-use facility1,500,000
(F) Construction, infrastructure and other related costs for the Pastore Unidos Por Filadelfia project related to minority and senior programming500,000
(G) Construction and other related costs for the renovation and expansion of the Columbia North Community YMCA3,600,000
(H) Construction, infrastructure and other related costs for the Betsy Ross House500,000
(I) Infrastructure and other costs related to the Hunting Park 21st Century Community and Learning Center1,000,000
(J) Construction, infrastructure and other related costs for the Stenton Service Wing Restoration Project1,000,000
(K) Construction, redevelopment and other costs related to the new Pleasant Playground building1,000,000
(L) Construction, acquisition, demolition, redevelopment and other costs associated with South Philadelphia housing10,000,000
(M) Construction and other related costs for the renovation of International House8,000,000
(N) Acquisition, construction and other related costs for the redevelopment of the Historic John Grass Company Building700,000
(O) Acquisition, construction, infrastructure and other related costs for the Norris Square Children's Center500,000
(P) Construction and other related costs for North Philadelphia retail corridors4,000,000
(Q) Construction, infrastructure and other related costs for a regional emergency services facility30,000,000
(R) Construction, infrastructure and other related costs for North Philadelphia recreation5,000,000
(S) Acquisition, construction and other related costs for the Philadelphia Polytechnic Charter High School10,000,000
(T) Construction and other related costs for the development of a skate park at Paine Park2,750,000
(U) Construction and other related costs for improvements to the Friends Housing Cooperative Foundation facilities250,000
(V) Acquisition, construction, infrastructure and other related costs for Chester Avenue revitalization1,000,000
(W) Acquisition, construction, infrastructure and other related costs to revitalize the Market Street Corridor, including adjacent areas30,000,000
(X) Construction, infrastructure and other related costs for the Children's Zoo8,200,000
(Y) Construction, infrastructure and other related costs for the McNeil Aviary6,000,000
(Z) Construction, infrastructure and other related costs for the Philadelphia Zoo Big Cat exhibit5,800,000
(AA) Construction and other related costs for the Washington Square redevelopment1,000,000
(BB) Construction of new facilities for the Wellness Community's National Survivorship Research and Training Institute5,000,000
(CC) For existing building, gallery, exhibit construction and renovations, including climate control, electric upgrades, technology upgrades and infrastructure at the Franklin Institute15,000,000
(DD) For construction of new building for the Franklin Institute15,000,000
(EE) Rehabilitation and expansion of the Main Service Center at the Children's Crisis Treatment Center, including construction4,000,000
(FF) Acquisition, construction, infrastructure and other costs related to the expansion of the Fox Chase Recreational Center1,200,000
(GG) Construction of community activity center at LaSalle College High School2,000,000
(HH) Construction of an educational conference center at the Cranaleith Spiritual Center1,400,000
(II) Expansion of the Crisis Center at Covenant House Pennsylvania2,000,000
(JJ) Demolition, infrastructure improvements, renovations and construction for University of Pennsylvania Law School building1,000,000
(KK) Design, engineering and construction of a pedestrian overpass at the intersection of Schuylkill River Park and Locust Street2,000,000
(LL) Acquisition and construction of St. Rita's Conference Center1,000,000
(MM) Construction of Fairmount Park Audubon Center at Strawberry Mansion2,500,000
(NN) Infrastructure improvements, renovations and construction of the Atwater Kent Museum1,000,000
(OO) Infrastructure improvements and construction for publicly accessible center for Civil War Studies at the Union League2,000,000
(PP) Development and construction of the Mill Creek Community Center8,000,000
(QQ) Infrastructure improvements, renovations and construction for the Mercy Family Center500,000
(RR) Renovations and construction of the multiuse athletic facility at Cardinal Dougherty High School1,000,000
(SS) Renovations to the Sultan Jihad Ahmad Community Center2,300,000
(TT) Acquisition, infrastructure improvements, renovations and construction for the Steele Heddle Building development project5,000,000
(UU) Renovations to the Louise Brookins Human Services Building500,000
(VV) Renovations and construction of the Penrose Recreation Center500,000
(WW) Demolition, infrastructure improvements and construction for the Uptown Entertainment Center500,000
(XX) Demolition, acquisition, infrastructure improvements and construction of the APM Wellness Center and headquarters4,000,000
(YY) Construction of the Haven Peniel Senior Citizens Residence400,000
(ZZ) Demolition and construction of the Men and Women for Human Excellence facility250,000
(AAA) Expansion of Northeast Philadelphia Regional Center of the Community College of Philadelphia10,100,000
(BBB) Construction of Lutheran Archives Center1,000,000
(CCC) Acquisition, infrastructure improvements, construction and related costs for expansion of Saint Joseph's University Campion Student Center5,950,000
(DDD) Acquisition, infrastructure improvements, construction and related costs for renovations to Saint Joseph's University facilities at 5920 City Avenue2,500,000
(EEE) Renovations, construction and infrastructure repair and revitalization of West Market Street20,000,000
(FFF) Renovations and construction of the Haddington/Shepard recreation complex2,000,000
(GGG) Renovations and construction of the PAPA Community Recreation Center5,000,000
(HHH) Demolition, renovation and construction of Mantua Hall7,000,000
(III) Renovation and construction for the Mill Creek revitalization project to include housing, recreation and economic development10,000,000
(JJJ) Demolition, renovation and construction of the Croydon apartment complex for housing, commercial development, recreation and education facilities3,000,000
(KKK) Renovation and construction of a community center as part of the Beaver Wynnfield Alternative Program3,000,000
(LLL) Renovation and construction of the Chalmers Athletic and Recreation Complex10,000,000
(MMM) Renovation of the Lincoln/Market Square education center and office complex10,000,000
(NNN) Construction of Enterprise Heights for a retail, community space and housing complex2,500,000
(OOO) Renovation of Mantua Haverford Community Center2,000,000
(PPP) Renovations to the Center for Human Advancement for education center, office complex and community space5,000,000
(QQQ) Renovation and construction of the Family Revitalization Complex150,000,000
(RRR) Renovation and expansion of the Keystone Hospice10,000,000
(SSS) Demolition, renovation and construction of Freedom Park complex10,000,000
(TTT) Renovations, infrastructure improvements and construction of the Historical Society of Pennsylvania building2,500,000
(UUU) Renovation and construction of animal shelter2,000,000
(VVV) Renovation and construction of a children and family health care complex in West Philadelphia3,000,000
(WWW) Renovation and construction of the West Philadelphia Technology Training Center2,500,000
(XXX) Acquisition, demolition, renovation and construction for Thomas Jefferson University special diagnostic and treatment medical and surgical facilities50,000,000
(YYY) Demolition and abatement costs for the Paschall Homes redevelopment project8,600,000
(ZZZ) Acquisition, construction, infrastructure, redevelopment and other costs related to the Plaza at Enterprise Heights7,000,000
(AAAA) Acquisition, construction, infrastructure, abatement of hazardous materials and other costs related to the Northwest Philly Arts and Culture Center10,000,000
(BBBB) (Reserved)
(CCCC) Construction, infrastructure, redevelopment and other costs related to Holy Family University campus improvements6,000,000
(DDDD) Construction, redevelopment and other costs related to Philadelphia University campus improvements2,000,000
(EEEE) Construction and other costs related to the Northeast Family YMCA3,500,000
(FFFF) Construction, infrastructure, redevelopment, abatement of hazardous materials and other costs related to the Independence Charter School8,600,000
(GGGG) Construction, redevelopment and other costs related to the Italian American Cultural Center2,000,000
(HHHH) Construction related to West Parkside Building economic and commercial development project500,000
(IIII) Infrastructure improvements and construction for the Nazareth Hospital Oncology project1,000,000
(JJJJ) Hahnemann Hospital, infrastructure improvements, construction and other related costs for the expansion of the intensive care unit4,500,000
(KKKK) Hahnemann Hospital, infrastructure improvements, construction and other related costs for modernization and expansion of the operating rooms and recovery room10,000,000
(LLLL) Demolition, infrastructure improvements, construction and other costs related to the Convocation and Basketball Arena project at Drexel University25,000,000
(MMMM) Infrastructure improvements and development related to the University City Gateway project30,000,000
(NNNN) Renovation and construction of the Haddington Health Center2,000,000
(OOOO) Infrastructure improvements for the former Liddonfield Homes at Torresdale Avenue and Jackson Place10,000,000
(PPPP) Construction and other related costs for the Octavius V. Catto Memorial project1,000,000
(QQQQ) Construction, infrastructure improvements and other costs related to the expansion of The Children's Hospital of Philadelphia on the site of the former Philadelphia Civic Center30,000,000
(RRRR) Independence National Historic Park, installation of below ground projection and electronic equipment to operate dramatization of events leading to the Declaration of Independence for the Lights of Liberty3,300,000
(SSSS) Acquisition, infrastructure improvements and construction for the Taller Puertorriqueno, Inc., expansion project5,000,000
(TTTT) Disability job training and residential project, acquisition, infrastructure improvements, construction and other costs related to a rehabilitation facility at 8th and Lehigh Streets6,000,000
(UUUU) Infrastructure improvements, construction and other costs related to the Aquatic Center project for the Overbrook School for the Blind3,000,000
(VVVV) Demolition, renovations, abatement and other costs related to the Frankford Arsenal Remediation and Revitalization project2,500,000
(WWWW) Construction, redevelopment and other costs related to the Energy Coordinating Agency Training Center853,000
(XXXX) Infrastructure improvements and construction for Allens Lane Art Center250,000
(YYYY) Construction and other costs related to the Lower Germantown Medical Center project500,000
(ZZZZ) Infrastructure improvements and construction of the Germantown Revitalization project500,000
(AAAAA) Infrastructure improvements for Elmwood Park500,000
(BBBBB) (Reserved)
(CCCCC) Renovations and expansion of Christian Street YMCA500,000
(DDDDD) Redevelopment and construction for Kingsessing Heights CDC Revitalization Plan750,000
(EEEEE) Acquisition and improvements for Intercultural Family Services, Inc.250,000
(FFFFF) Renovations of building for the Boys' Latin of Philadelphia Charter School300,000
(GGGGG) (Reserved)
(HHHHH) Renovation of storefront property for the Art Sanctuary500,000
(IIIII) Renovations to RACS building500,000
(JJJJJ) Renovations for the Belmont Community building1,250,000
(KKKKK) Construction and infrastructure for the Grays Ferry Memorial Park at 29th and Tasker Streets500,000
(LLLLL) Infrastructure improvements, construction and other costs related to the LISC Multi-Partner West Philadelphia Initiative4,000,000
(MMMMM) Acquisition, construction, infrastructure and other related costs to revitalize Ogontz Avenue corridor5,000,000
(NNNNN) Infrastructure improvements, construction and other related costs for a hotel facility5,000,000
(OOOOO) Construction of emergency department, including the expansion of existing medical and surgical outpatient facilities to Saint Christopher's Children's Hospital10,000,000
(PPPPP) Construction, infrastructure improvements and other costs related to the Dilworth Plaza project20,000,000
(QQQQQ) Acquisition, construction and other costs related to the redevelopment of the John Wanamaker School site6,000,000
(RRRRR) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Greene Street and Pulaski Avenue to Greene Street and Berkley Street, including adjacent areas30,000,000
(SSSSS) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Wayne Avenue and Lincoln Drive to Wayne Avenue and Berkley Street, including adjacent areas30,000,000
(TTTTT) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Germantown Avenue and Willow Grove Avenue to Germantown Avenue and Cecil B. Moore Avenue, including adjacent areas30,000,000
(UUUUU) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Chelten Avenue and Wister Street to Pulaski Avenue and Chelten Avenue, including adjacent areas30,000,000
(VVVVV) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Broad Street and Olney Avenue to Chew Avenue and Mt. Pleasant Avenue, including adjacent areas30,000,000
(WWWWW) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Wadsworth Avenue to 18th Street and Cheltenham Avenue, including adjacent areas30,000,000
(XXXXX) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Stenton Avenue and Ogontz Avenue to Stenton Avenue and Mt. Pleasant Avenue, including adjacent areas30,000,000
(YYYYY) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Broad Street and Cheltenham Avenue to Broad Street and Vine Street, including adjacent areas30,000,000
(ZZZZZ) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from 80th Avenue and Ogontz Avenue to 65th Avenue and Ogontz Avenue, including adjacent areas30,000,000
(A6) Acquisition, construction, infrastructure and other related costs to revitalize the corridor from Cheltenham Avenue to Ogontz Avenue, including adjacent areas30,000,000
(B6) Construction, redevelopment and other related costs for the People's Emergency Center rehabilitation project1,500,000
(C6) Acquisition, construction, infrastructure and other costs related to the Academy of Vocal Arts expansion project1,250,000
(D6) Acquisition, construction, infrastructure, redevelopment and other costs related to the Einstein Emergency Department expansion8,000,000
(E6) Acquisition, construction, infrastructure and other costs related to the Center for Autism expansion project7,600,000
(F6) Acquisition, construction, infrastructure, redevelopment and other costs related to the Cheltenham and Ogontz Avenues redevelopment project10,000,000
(G6) Construction, infrastructure and other related costs for renovations to the African American Museum500,000
(H6) Construction, redevelopment and other costs related to the Avenue of the Arts project25,000,000
(I6) Construction, redevelopment and other related costs for the Academy of Natural Sciences24,000,000
(J6) Construction, acquisition, redevelopment and other related costs for the Uptown Theater3,000,000
(K6) Construction, redevelopment and other related costs for the Philadelphia Center for Art and Technology1,000,000
(L6) Construction, acquisition and other related costs for the Academy in Manayunk Institute for Learning and Research5,000,000
(M6) Construction, infrastructure and other related costs for Congreso's Education and Youth Building4,000,000
(N6) Design, construction, renovation and expansion of emergency room, including new patient rooms at Mercy Philadelphia Hospital4,350,000
(O6) Improvements to George Washington High School track and related facilities, including necessary costs2,100,000
(P6) Infrastructure improvements, renovations and construction for the Juniata Golf restoration project500,000
(Q6) Acquisition, infrastructure improvements and construction for the Empowerment Village project2,000,000
(R6) Renovations and construction for the Visiting Nurse Association building900,000
(S6) Renovations and rehabilitation for the Peoples Emergency Center3,000,000
(T6) Renovations and expansion of the Northeastern Hospital Obstetric Suite for Temple Health2,500,000
(U6) Renovations and construction of the Boyer Pavilion at Temple University Hospital7,500,000
(V6) Construction and related costs for the Globe Dye Works development project2,000,000
(W6) Renovations of the Devon Theater of Performing Arts into an arts center and retail stores1,000,000
(X6) Infrastructure improvements, construction and other related costs for the Urban Youth Baseball Academy3,000,000
(Y6) Acquisition, renovations, construction and other related costs for the Academy of Vocal Arts1,250,000
(Z6) Construction, infrastructure improvements and other related costs to the Academy of Natural Sciences24,000,000
(A7) Acquisition, infrastructure improvements, construction and other costs related to the Kensington and Allegheny Commercial Corridor project2,500,000
(B7) Construction and infrastructure improvements for the Franklin Towne Charter High School expansion project3,500,000
(C7) Construction and infrastructure improvements for the Temple University Restoration project14,500,000
(D7) Construction, infrastructure improvements and other costs related to the Free Library of Philadelphia Restoration project30,000,000
(E7) Construction, infrastructure improvements and other costs related to the Avenue of the Arts North Broad Streetscape project20,000,000
(F7) Construction, infrastructure improvements and other costs related to the President's House project3,500,000
(G7) Construction, infrastructure improvements and other costs related to the Robin Hood Dell East project2,500,000
(H7) Construction, infrastructure improvements and other costs related to the Community Performing Arts Center at Venice Island project1,000,000
(I7) Construction and other related costs for the SWAT Bomb Tactical Facility project3,375,000
(J7) Construction and other related costs for the Youth Study Center9,625,000
(K7) Acquisition, construction, infrastructure redevelopment and other related costs for the historic Boyd Theatre project21,500,000
(L7) Acquisition, infrastructure, redevelopment and other related costs for the Mazzoni Center project2,000,000
(M7) Acquisition, construction, infrastructure, redevelopment and other related costs for a youth hockey education and training center project20,000,000
(N7) Acquisition, construction, infrastructure, redevelopment and other related costs for a basketball training facility project15,000,000
(O7) Acquisition, construction, infrastructure, redevelopment and other related costs for a hotel project located adjacent to the Pennsylvania Convention Center20,000,000
(P7) Construction, abatement of hazardous materials and other related costs for the Turner Elementary School conversion project1,000,000
(Q7) Construction and other related costs for the University of the Sciences of Pennsylvania McNeil Science and Technology Center expansion project9,000,000
(R7) Acquisition, construction and other related costs for the Liberty Resources, Inc., project25,000,000
(S7) Acquisition, construction, redevelopment and other related costs for the Weavers Way Co-op expansion project2,000,000
(T7) Construction, infrastructure, restoration and other related costs for the rehabilitation of the Cruiser Olympia at Independence Seaport Museum10,400,000
(U7) Construction, infrastructure and other related costs for an area for screening and inspection at Pier 98 and Pier 98 annex at the Port of Philadelphia10,000,000
(V7) Construction and other related costs for repairs and restoration of the dry dock at Aker Philadelphia Shipyard5,000,000
(W7) Construction, infrastructure and other related costs for improvements at Tioga Terminal at the Port of Philadelphia4,000,000
(X7) Acquisition, construction, demolition, redevelopment and other related costs for an educational facility in South Philadelphia10,000,000
(Y7) Acquisition, construction, demolition, redevelopment, infrastructure and other related costs for a training facility in South Philadelphia10,000,000
(Z7) Construction and other related costs for Point Breeze commercial corridor improvements1,300,000
(A8) Construction and other related costs for the Imhotep Charter School4,750,000
(B8) Acquisition, construction, infrastructure and other related costs to redevelop Mt. Airy5,000,000
(C8) Construction and other related costs for the ODUNDE Institute250,000
(D8) Construction, infrastructure improvements and other costs related to the Esperanza Campus project3,000,000
(E8) Construction, infrastructure improvements and other costs related to the Girard Square Development project for mixed-use commercial development, including hotel, office, retail and parking in an area bounded by 12th Street to 11th Street and Market Street to Chestnut Street60,000,000
(F8) Acquisition, infrastructure improvements and construction of a community birthing center in Northeast Philadelphia10,000,000
(G8) Construction for Brooklyn Heights housing project2,000,000
(H8) Construction and related costs for the Sbarro Health Research Organization Research Residence3,500,000
(I8) Construction and related costs for the Skyline Performing Arts Center at the University of the Arts1,500,000
(J8) Construction and other related costs for improvements to the Smith Memorial Playhouse at Fairmount Park1,500,000
(K8) Plaza construction at the Philadelphia Lutheran Theological Seminary1,250,000
(L8) Acquisition, infrastructure improvements and construction for the Middle States Association of Colleges and Schools project4,000,000
(M8) Acquisition, construction, demolition, infrastructure, renovation and other related costs for Red Cross House1,500,000
(iii) Yeadon Borough
(A) Construction, redevelopment and other related costs for the Kerr Field project500,000
(iv) Philadelphia and Montgomery Counties
(A) Acquisition, construction, infrastructure and other related costs for community improvements along Cheltenham Avenue and Ogontz Avenue, including adjacent areas10,000,000
(52) Pike County
(i) County projects
(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for improvements to the Mt. Laurel Center for Performing Arts600,000
(B) Acquisition, site development, infrastructure and other related costs for the construction of an expansion of the Pike County Administrative Facility5,000,000
(C) Acquisition, infrastructure, site development, construction and other related costs for the development of an emergency training center5,000,000
(D) Acquisition, site development, infrastructure and construction of a juvenile detention center and youth shelter5,000,000
(i.1) Blooming Grove Township
(A) Construction of an emergency services training complex/911 center for fire/rescue, EMS and law enforcement personnel, including training tower, observation command center and instructional building3,826,000
(ii) Milford Borough
(A) Infrastructure and construction of a public library1,000,000
(ii.1) Palmyra Township
(A) Acquisition, infrastructure, construction and other related costs for the construction of a 10,000-square-foot visitors center on Route 6 adjacent to Palmyra Township Beach2,000,000
(iii) Pike County Industrial Development Corporation
(A) Acquisition, infrastructure, site development, construction and other related costs for the development of the Pike County Business Park2,500,000
(53) Potter County
(i) County projects (Reserved)
(ii) Coudersport Borough
(A) Construction, renovation and rehabilitation necessary for a comprehensive upgrade of the facility and physical plant, including expansion of the Emergency Department, infrastructure improvements and physical redesign of the long-term care facility, fire safety protection improvements and upgrades and renovation of the dietary service department at Charles Cole Memorial Hospital2,000,000
(iii) Potter County Redevelopment Authority
(A) Acquisition, infrastructure, construction and other related costs for the revitalization and rehabilitation of downtown Galeton, including facade improvements, site development and facility construction1,000,000
(B) Infrastructure, construction and other related costs for the development of an industrial park in the Borough of Coudersport, including site preparation, construction and on-site infrastructure development1,000,000
(C) Acquisition, infrastructure, construction and other related costs for the development of a helicopter landing and maintenance facility for economic development purposes related to attracting corporate tenants to Potter County1,000,000
(54) Schuylkill County
(i) County projects
(A) Acquisition, infrastructure and other costs related to the construction of a regional industrial park1,000,000
(B) Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants10,000,000
(C) Acquisition, construction, infrastructure and other related costs for the Schuylkill Women in Crisis facility1,000,000
(D) Acquisition, infrastructure improvements and construction for the Aurora industrial building project800,000
(E) Construction, infrastructure and other related costs to renovate the Schuylkill County Court House500,000
(F) Acquisition, construction, redevelopment and other related costs for the Schuylkill County Children and Youth expansion project500,000
(G) Acquisition, construction, infrastructure, redevelopment and other related costs for a community revitalization project in Schuylkill County1,000,000
(H) Construction, redevelopment and other related costs for the Schuylkill Health Alliance250,000
(ii) Coaldale Borough
(A) Construction, infrastructure and other costs related to the renovation of the Coaldale Complex1,000,000
(iii) Orwigsburg Borough
(A) Construction, infrastructure and other costs related to the renovation of the Orwigsburg Memorial Hall500,000
(B) Construction, infrastructure and other costs related to the renovation of the Orwigsburg Public Library500,000
(C) Construction, infrastructure and other costs related to the renovation of Orwigsburg Borough Hall500,000
(iii.1) City of Pottsville
(A) Construction, infrastructure, redevelopment and other related costs for the Pottsville intermodal transportation project10,000,000
(iv) Tamaqua Borough
(A) Reconstruction of Wabash Creek storm water tunnel and diversion system5,000,000
(B) Repairs to the two Owl Creek dams, including breast repairs and spillway construction3,000,000
(v) West Penn Township
(A) Acquisition, infrastructure and other costs related to the construction of a regional industrial park1,000,000
(55) Snyder County
(i) County projects (Reserved)
(ii) Selinsgrove Borough
(A) Construction of Susquehanna University Science facility15,000,000
(B) Renovation of Susquehanna University Science Hall, including related infrastructure6,000,000
(56) Somerset County
(i) County projects
(A) Acquisition and construction of an inpatient hospice facility by Somerset Hospital, to be located in Somerset Township500,000
(B) Redevelopment, construction and related infrastructure costs for Laurel Highlands Business Park5,000,000
(C) Renovations to Somerset Hospital, including upgrade of pharmacy facilities1,500,000
(D) Acquisition, renovation, demolition and construction related to the development of a downtown health care campus associated with Somerset Hospital1,500,000
(ii) Fairhope Township
(A) Site development, construction, rehabilitation and infrastructure improvements to the International Conservation Center3,000,000
(iii) Jefferson Township
(A) Site development, construction and infrastructure improvements to property located along Route 3110,000,000
(iv) Windber Borough
(A) Construction and other related costs for expansion of Windber Medical Center emergency department1,000,000
(57) Sullivan County (Reserved)
(58) Susquehanna County (Reserved)
(59) Tioga County
(i) County projects
(A) Development of the Marsh Creek Greenway, extending from the Borough of Wellsboro to the Pine Creek Trail at Wellsboro Junction2,350,000
(B) Construction of a new 911/emergency operations center/training facility3,500,000
(C) Development of the Mill Cove Environmental Education Center, including infrastructure improvements and construction of support facilities1,500,000
(D) Acquisition, infrastructure, construction and other related costs for the Nature Quest Geotourism Lodge and business facilities development project, including the development of a 200-room lodge and operational facilities located in Ansonia12,500,000
(ii) Tioga County Development Corporation
(A) Development of a green design (LEED) industrial park along US 15 (future I-99), including interchange accesses to US 15 as part of the Interstate 99 Business Park, Phase II7,000,000
(B) Renovation and rehabilitation of the TCDC historic building located in the Borough of Wellsboro, including hazardous material abatement750,000
(iii) Liberty Borough
(A) Replacement of a stone culvert that parallels SR 2007 through Liberty Borough as part of the Williamson Trail Project500,000
(iv) Shippen Township
(A) Expansion and construction of Nature Quest Geotourism Lodge, including acquisition and infrastructure12,500,000
(v) Wellsboro Borough
(A) Acquisition, construction and infrastructure improvements of a Community Performing Arts Center7,500,000
(B) Construction of the Deane Center for the Performing Arts7,500,000
(60) Union County
(i) County projects
(A) Development of the Bucknell University Bull Run Gateway neighborhood development project, including an art center, parking facilities, bookstore, inn and business center20,000,000
(ii) Kelly Township
(A) Expansion and renovation of Evangelical Community Hospital, including related infrastructure11,000,000
(61) Venango County
(i) County projects
(A) Renovations and rehabilitation to the Venango County Courthouse500,000
(B) Infrastructure and other related costs for the development of the Sandycreek Industrial Park, a multitenant light industrial park700,000
(C) Site development, infrastructure improvements and construction of a building on a designated Foreign Trade Zone adjacent to the Venango Regional Airport1,000,000
(D) Acquisition and construction of a bike trail from McClintock Well No. 1 from Cornplanter Township to the City of Oil City1,200,000
(ii) Emlenton Borough
(A) Acquisition, site development and construction to support revitalization in Emlenton Borough500,000
(iii) City of Oil City
(A) Renovations, construction and expansion of the Oil City YMCA1,500,000
(B) Renovations, new construction and rehabilitation of the Cornplanter Square building and the Brody Block7,500,000
(62) Warren County
(i) County projects
(A) Infrastructure, site development, rehabilitation, construction and other costs related to the expansion of the telecommunications infrastructure within and throughout northwest Pennsylvania to allow for business retention, expansion and recruitment5,000,000
(ii) Pine Grove Township
(A) Construction of 12 independent living units, including site work and infrastructure improvements at Warren General Hospital1,025,000
(iii) City of Warren
(A) Acquisition of imaging equipment, electronic medical record systems software and an infant abduction security system at Warren General Hospital575,000
(B) Renovation and expansion of existing facility for medical offices at Warren General Hospital1,350,000
(C) Renovation and expansion of the critical care inpatient unit at Warren General Hospital1,250,000
(D) Infrastructure, construction and other related costs for the Warren downtown economic development project, including comprehensive and interrelated public infrastructure improvements and enhancements to street corridors in the downtown central business district2,500,000
(E) Acquisition, infrastructure, redevelopment and other related costs for the construction of a new hotel and convention center on Warren's riverfront as part of the ambitious Impact Warren redevelopment initiative3,000,000
(63) Washington County
(i) County projects (Reserved)
(ii) Allenport Borough
(A) Acquisition, construction, infrastructure and other related costs to restore the Barge Shipping facility1,250,000
(ii.1) Bentleyville Borough
(A) Acquisition, infrastructure improvements and reconstruction of historic buildings500,000
(B) Construction and expansion of the Bentworth Senior Center1,000,000
(ii.2) Brownsville Township
(A) Construction and other related costs for equipment upgrades and renovation of the Brownsville Hospital10,000,000
(iii) California Borough
(A) Acquisition, construction, infrastructure and other related costs for the California Technology Park film industry project1,250,000
(B) Construction and other related costs for a community recreation and wellness center500,000
(iv) Canonsburg Borough
(A) Construction, infrastructure and other related costs for the Town Park project940,000
(B) Infrastructure improvements and construction, including roadway connection for Southpoint II project2,000,000
(C) Infrastructure and other related costs for the Fort Pitt Bridgeworks Business Park2,500,000
(iv.1) Canton Township
(A) Acquisition, infrastructure improvements, renovations, construction and other related costs for Jessop Place1,000,000
(v) Carroll Township
(A) Construction and other related costs for the Monongahela Valley Hospital upgrade project3,000,000
(vi) Cecil Township
(A) Construction and development of recreation complex near Muse School property500,000
(B) Infrastructure improvements and construction for Southpoint II project4,000,000
(vi.1) Charleroi Borough
(A) Construction and other costs related to the Coyle Theater rehabilitation project1,400,000
(B) Construction, infrastructure, redevelopment and other related costs for the River Room Conference and Events Center1,300,000
(vii) Chartiers Township
(A) Construction and other related costs for the Chartiers Township community center500,000
(B) Land acquisition and development of Chartiers Township recreation complex5,000,000
(C) Infrastructure improvements and construction of Pennsylvania Trolley Museum Visitor's Center8,000,000
(viii) City of Washington
(A) Construction and other related costs for the Crossroads Amphitheater1,000,000
(B) Construction and other related costs for the redevelopment of Main and Maiden Streets15,000,000
(C) Improvements to the Washington Park recreation facility1,250,000
(D) Construction and other related costs for the Main Street Works Project12,500,000
(E) Acquisition of land and construction of a police/fire safety building complex3,000,000
(F) Construction of Washington and Jefferson College multiuse economic development facility4,000,000
(G) Construction of the Washington Hospital expansion project10,000,000
(H) Acquisition, demolition and construction for the Wheeling Street Revitalization project4,000,000
(I) Infrastructure improvements and construction of the Leymone Center improvement project2,000,000
(J) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs related to Phase II of the Crossroads Project5,000,000
(ix) Cross Creek Township
(A) Construction and other related costs for the Cedar Grove community/recreation project500,000
(x) Fallowfield Township
(A) Construction, infrastructure, acquisition and other costs related to the Shell Building and supporting infrastructure in Alta Vista Business Park1,250,000
(x.1) Jefferson Township
(A) Infrastructure improvements and construction for the Meadowcroft Rockshelter and Museum of Rural Life2,000,000
(x.2) City of Monongahela
(A) Construction, infrastructure and other related costs for the Aquatorium project435,000
(xi) Mount Pleasant Township
(A) Construction and other related costs for the Hickory Main Street revitalization500,000
(xii) North Franklin Township
(A) Construction and other related costs for a new municipal office/community building3,000,000
(B) Acquisition, construction, infrastructure and other costs related to the Washington County Airport/Skypointe Business Park2,000,000
(xiii) North Strabane Township
(A) Construction and other related costs for the North Strabane Township community/recreation center1,000,000
(B) Acquisition, expansion, renovation, construction and infrastructure improvements for the Canonsburg General Hospital campus10,000,000
(xiv) Roscoe Borough
(A) Construction, infrastructure and other related costs for community park improvements500,000
(xiv.1) South Franklin Township
(A) Acquisition, infrastructure improvements and construction for Skypointe industrial and business park5,000,000
(B) Construction and infrastructure improvements for the mixed-use office and industrial, residential and commercial developments along the Route 18 South corridor5,000,000
(xv) South Strabane Township
(A) Construction, infrastructure and other related costs for the Zediker Station Business Park5,000,000
(B) Construction and other related costs for a police and road department facility875,000
(C) Infrastructure improvements and construction for the Meadowlands Interchange rehabilitation project5,000,000
(xvi) Union Township
(A) Infrastructure, redevelopment, abatement of hazardous materials and other costs related to the Phoenix Business Park1,000,000
(xvii) Washington Borough
(A) Construction, infrastructure, acquisition and other related costs to build a Washington Community Health Center1,500,000
(64) Wayne County
(i) County projects
(A) Renovations of athletic fields and surrounding infrastructure at the Western Wayne School District500,000
(B) Infrastructure, technological equipment upgrades and construction of an emergency management and 911 center2,250,000
(i.1) Hawley Borough
(A) Acquisition, infrastructure and other costs related to the construction of a medical campus1,800,000
(65) Westmoreland County
(i) County projects
(A) Design and construction of a 22,000-square-foot history and education center at the historic Hanna's Town3,000,000
(B) Infrastructure, construction and other related costs for the renovation and rehabilitation of the Laurel Mountain Ski Resort facilities1,500,000
(C) Westmoreland Cultural Trust
(I) Acquisition and rehabilitation of a structure in downtown Latrobe for the purposes of commercial reuse and development of a downtown destination spot as part of the Latrobe Train Station project1,000,000
(II) Renovations and rehabilitation to the historical Union Trust building1,000,000
(III) Acquisition and rehabilitation of a structure in the downtown area of West Newton for the West Newton Cultural Center1,000,000
(IV) Acquisition, rehabilitation and renovations to the historical Greensburg Cargo Train Station, including the acquisition of adjacent properties or structures, for the purpose of placing the station back into productive commercial use3,000,000
(V) Acquisition, infrastructure, construction and other related costs for the construction of a 175-unit parking garage as part of the Greensburg Parking Garage project3,000,000
(VI) Construction of a railway tunnel extension underneath Norfolk Southern right-of-way, to connect existing tunnel and Trust property at the Greensburg train station to allow pedestrian access to and from Seton Hill University500,000
(D) Westmoreland County Community College
(I) Infrastructure, construction and other related costs for the construction of a workforce and economic development training center, located in New Kensington3,700,000
(II) Infrastructure, construction and other related costs for the construction of a workforce and economic development training center, located in Youngwood3,700,000
(III) Infrastructure, construction and other related costs to the expansion of the Public Safety Training Center3,750,000
(E) Acquisition, infrastructure, redevelopment and construction costs for a medical school5,000,000
(F) Construction and related costs for a renewable energy plant4,500,000
(G) Construction of facilities for Adelphoi Village, including related costs1,500,000
(H) Infrastructure, construction and other related costs for the River Forest development project900,000
(i.1) Allegheny Township
(A) Construction and other related costs for the Copeland Road bridge project at Chartiers Run Creek250,000
(i.2) Derry Township
(A) Acquisition, infrastructure, construction and other related costs for the construction of a new firehouse for the Bradenville Volunteer Fire Department600,000
(ii) City of Greensburg
(A) Construction and other costs related to Seton Hill University campus expansion and improvements, including, but not limited to, construction of a medical school15,000,000
(B) Acquisition, construction, infrastructure and other related costs for Greensburg downtown revitalization5,000,000
(C) Acquisition, construction, infrastructure and other related costs for the Westmoreland County Community College Sports and Recreation Facility6,000,000
(D) Renovation of the science laboratories located on the Seton Hill University campus1,000,000
(E) Renovations and expansion of the student center facilities located on the Seton Hill University campus1,000,000
(F) Acquisition, infrastructure, design, redevelopment and construction-related costs for the expansion of the Westmoreland Museum of American Art1,250,000
(G) Acquisition, infrastructure, design, redevelopment and construction-related costs for the total rehabilitation of a building in the downtown district of Greensburg2,500,000
(H) Acquisition, infrastructure, design, redevelopment and construction-related costs for capital improvements and redevelopment of cultural, historic and downtown districts of the City of Greensburg2,500,000
(I) Acquisition, infrastructure, redevelopment, construction and other costs related to the Westmoreland Human Services new Pathways Permanent Supportive Housing Program500,000
(ii.1) Hempfield Township
(A) Acquisition, construction, infrastructure and other related costs to expand Green Forge750,000
(ii.2) City of Jeannette
(A) Acquisition, infrastructure, redevelopment and construction of a 15,000-square-foot community building, including parking facilities500,000
(iii) Latrobe Borough
(A) Renovation and expansion of St. Vincent College facilities15,000,000
(B) Construction and other related costs for improvements at the Fred Rogers Center at Saint Vincent College400,000
(iii.1) City of Lower Burrell
(A) Acquisition and construction for the revitalization of Lower Burrell Shopping Center9,300,000
(iii.2) City of Monessen
(A) Acquisition, infrastructure improvements and construction of the City of Monessen Municipal Building Complex5,000,000
(iii.3) City of New Kensington
(A) Renovation, rehabilitation and construction of the downtown central business district2,000,000
(B) Acquisition, renovations, construction and infrastructure improvements for River Line project10,000,000
(C) Acquisition, renovations, construction and infrastructure improvements of the Citizens Ambulatory Care Center5,000,000
(D) Construction and other related costs for the Alle-Kiski Education Center2,500,000
(E) Acquisition, infrastructure, renovation and rehabilitation of the core area of the central business district from the railroad tracks to Industrial Boulevard and from 12th Street to 7th Street2,000,000
(iii.4) Rostraver Township
(A) Construction, infrastructure, redevelopment and other related costs for the Rostraver Business Park development project10,000,000
(iv) Scottdale Borough
(A) Acquisition, construction, renovations and other costs related to the Scottdale Bank Building project1,000,000
(B) Acquisition, construction, renovations and other costs related to the Scottdale Bank Building project1,000,000
(iv.1) Trafford Borough
(A) Construction and other costs related to the Trafford Borough Soccer Complex facility3,600,000
(B) Acquisition and construction of a new public safety, community and senior citizen building, including parking625,000
(iv.2) Unity Township
(A) Renovation and expansion of facilities for the Herbert W. Boyer School of Natural Science, Mathematics, and Computing, including construction at St. Vincent College15,000,000
(B) Acquisition, renovations and construction of a streetscape project in conjunction with design proposal near U.S. Route 30 and SR 981, Smart Growth Partnership of Westmoreland County3,500,000
(v) Upper Burrell Township
(A) Acquisition, construction, infrastructure and other related costs of a manufacturing campus5,000,000
(v.1) Vandergrift Borough
(A) Acquisition, construction and other costs related to the Vandergrift redevelopment project10,000,000
(vi) Youngwood Borough
(A) Construction, redevelopment and other costs related to the renovation of the Westmoreland County Community College Baseball Stadium2,500,000
(vii) Westmoreland County Industrial Development Corporation
(A) Infrastructure, construction and other related costs for the Phase II development of the Westmoreland County Airpark1,000,000
(B) Infrastructure and construction costs for the development of a parcel of land located in the Westmoreland Distribution Park East1,500,000
(C) Infrastructure, construction and renovation of the Westmoreland County Community College baseball stadium3,000,000
(D) Acquisition, infrastructure, construction and other related costs for the development of a 114-acre parcel of land located along SR 1053 directly opposite the Westmoreland County Industrial Park3,000,000
(E) Site development, infrastructure, construction and other related costs for the Respironics Headquarters Campus project located at the Westmoreland Business and Research Park, including the development of a new manufacturing campus500,000
(66) Wyoming County
(i) County projects (Reserved)
(ii) Tunkhannock Township
(A) Infrastructure, construction and renovations to the Tyler Memorial Hospital, including expansion of imaging department, emergency department and outpatient registration area6,250,000
(67) York County
(i) County projects
(A) Infrastructure, equipment and construction of a Civil War era excursion rail line and historic experience to be known as Steam into History1,000,000
(B) Acquisition, construction and other related costs for a community college campus development in York County15,000,000
(ii) City of York
(A) Construction, infrastructure, abatement of hazardous materials and other costs related to the Government Center Renovation Project8,500,000
(B) Acquisition, construction, infrastructure and other related costs for downtown community college campus7,000,000
(C) Construction, acquisition, redevelopment, abatement of hazardous materials and other costs related to the Downtown York Historic Preservation and Revitalization Project9,000,000
(D) Acquisition, construction, infrastructure, redevelopment and other costs related to the York Museum of Art, Cultural Center and Central Market upgrades22,000,000
(E) Acquisition, construction, infrastructure and other costs related to the York County Technology Center10,000,000
(F) Redevelopment and other related costs for South George Street2,000,000
(ii.1) City of York and Spring Garden Township
(A) Acquisition, infrastructure, redevelopment and other costs related to the York College West Campus rehabilitation project4,000,000
(ii.2) Red Lion Borough
(A) Streetscape improvements, including necessary costs1,550,000
(iii) Springettsbury Township
(A) Construction, infrastructure, abatement of hazardous materials and other costs associated with the Pleasant Acres Renovation Project11,250,000
(B) Construction of a facility to house a youth development center13,500,000
(iv) West Manheim Township
(A) Redevelopment of South Western Elementary School for use as township administrative offices, including construction and related infrastructure2,000,000
(v) York Township
(A) Acquisition, infrastructure and renovations for the development of personal care homes for the elderly1,000,000
(68) Multiple Counties
(i) Butler and Mercer Counties
(A) Slippery Rock and Liberty Townships
(I) Acquisition and development of Slippery Rock Business Park, including related infrastructure1,250,000
(B) Community Development Corporation of Butler County
(I) Acquisition, infrastructure, construction and development of Phase I of the Slippery Rock Business Park II1,250,000
(ii) Erie, McKean, Warren, Crawford, Venango and Clarion Counties
(A) City of Corry Redevelopment Authority
(I) Infrastructure, construction and other related costs for the installation of SONET-based fiber-optic telecommunications infrastructure along the Route 6 corridor between Union City, Erie County, and Coudersport, Potter County4,250,000
(iii) Luzerne and Schuylkill Counties
(A) County projects
(I) Acquisition, construction, infrastructure and other related costs for the development of a cargo airport250,000,000
(iv) Snyder and Union Counties
(A) County projects
(I) Acquisition, construction, infrastructure and other related costs for the Greater Susquehanna Valley YMCA3,000,000
(v) Montour, Northumberland, Snyder and Union Counties
(A) County projects
(I) Construction, renovations and other related costs for a new innovation center3,000,000
(vi) Westmoreland and Allegheny Counties
(A) Trafford Borough
(I) Construction, site preparation, renovations, upgrades, infrastructure improvements for development of commercial space at the Trafford Commerce Center4,000,000
(vii) Carbon and Monroe Counties
(A) Pocono Region
(I) Pocono Mountains Wayfinding Signing program1,000,000
(viii) Montgomery and Philadelphia Counties
(A) Engineering and construction of Cresheim Multiuse Trail between Valley Green in Fairmount Park in Philadelphia and Fort Washington State Park2,500,000
(ix) Lawrence and Beaver Counties
(A) Infrastructure improvements and construction of a National Character Education Foundation training headquarters6,000,000
(x) Carbon and Lehigh Counties
(A) Construction, infrastructure, redevelopment and other related costs for the Lehigh Gap Nature Center expansion1,500,000
(xi) Centre, Clinton, Lycoming, Sullivan, Luzerne, Columbia, Montour, Northumberland, Union and Snyder Counties
(A) Acquisition, construction and other related costs for renewable energy terminal and distribution center required for the LYCO 1, LLC's renewable energy terminal project5,000,000
(B) Acquisition, construction and other related costs for cellulose storage sites and renewable energy facilities for LYCO 1 LLC's cellulose ethanol manufacturing project35,000,000

Section 7. Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Environmental Protection
(i) Allegheny County
(A) Construction, infrastructure, abatement of hazardous materials and other costs related to the North Hills flood prevention project2,000,000
(B) Construction, infrastructure and other related costs for the Penn Hills stormwater management project1,200,000
(C) Additional funds for the Girtys Run Federal Flood Protection Project in the Borough of Millvale and Shaler and Ross Townships3,600,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $600,000)

(D) Additional funds for the Pine Creek Federal Flood Protection Project in Etna Borough and Shaler Township3,600,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $600,000)

(E) Additional funds for the Saw Mill Run Federal Flood Protection Project in the City of Pittsburgh3,600,000

(Base Project Allocation - $3,000,000)

(Design and Contingencies - $600,000)

(F) Pine Creek watershed, stormwater management and flood protection for Lower Allison Park4,623,000
(i.1) Blair County
(A) Construction, infrastructure and other related costs for the Mill Run Rehabilitation Project76,000
(i.2) Carbon County
(A) Construction, infrastructure and other related costs for the Towamensing Trails Dam rehabilitation project1,250,000
(ii) Chester County
(A) Construction, infrastructure and other related costs for the Business 30 Flood Control Project900,000
(ii.1) Clearfield County
(A) Construction, infrastructure and other related costs for flood protection projects in Chester Hill Borough3,000,000
(B) Construction, infrastructure and other related costs for flood protection projects in Coalport Borough300,000
(ii.2) Clinton County
(A) Pine Creek Township, construction, redevelopment and other costs related to the Chatham Run levee project7,500,000
(iii) Columbia County
(A) Fishing Creek Flood Control Project, including gravel bar removal1,000,000
(iv) Crawford County
(A) Conneautville Dam rehabilitation750,000
(iv.1) Derry Township
(A) Stormwater control project in Derry Township8,000,000
(B) Stormwater control project in Lower Swatara Township6,000,000
(iv.2) Indiana County
(A) Acquisition and construction of a flood control project designed by the Army Corps of Engineers2,000,000
(iv.3) Lackawanna County
(A) Additional funds for the Greenridge portion of the Scranton Federal Flood Protection Project in the City of Scranton6,000,000

(Base Project Allocation - $5,000,000)

(Design and Contingencies - $1,000,000)

(v) Monroe County
(A) Additional funds to refurbish Brady's Lake Dam3,600,000
(B) Flood control project in Paradise Township1,500,000
(v.1) Montgomery County
(A) Construction, infrastructure and other related costs for the Jenkintown flood control project1,200,000
(vi) Northumberland County
(A) Construction, infrastructure and other related costs for the Susquehanna River Clearing and Grubbing Project200,000
(B) Construction, infrastructure and other related costs for the Reagan Street Underpass Flooding Abatement Project2,200,000
(C) Shoreline stabilization for flood control system in Sunbury Borough750,000
(vi.1) Potter County
(A) Repair and rehabilitation of the North Fork Dam2,000,000
(vii) Schuylkill County
(A) Repairs to the two Owl Creek dams, including breast repairs and spillway construction in Borough of Tamaqua3,000,000
(B) Reconstruction of Wabash Creek storm water tunnel and diversion system in Borough of Tamaqua5,000,000
(C) Construction, infrastructure and other costs related to Klingertown flood control8,100,000
(viii) Somerset County
(A) Construction, infrastructure and other related costs for the East Main Street flood protection project5,000,000
(ix) Washington County
(A) Reconstruction and stabilization of Canonsburg Dam, including spillway and breast works8,000,000
(x) Westmoreland County
(A) Construction and other related costs for a flood control project at Little Puketa Creek on State Route 56, including creek basin dredging and bank stabilization250,000

Section 8. Itemization of Keystone Recreation, Park and Conservation Fund projects.

Projects in the category of public improvement projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by current revenues of the Keystone Recreation, Park and Conservation Fund are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Conservation and Natural Resources
(i) Bald Eagle State Park
(A) Provide furniture and equipment for the Inn at Bald Eagle400,000
(i.1) Beltzville State Park
(A) Repair the sewage system to reduce infiltration400,000
(i.2) Black Moshannon State Park
(A) Rehabilitate dam spillway and boat launch400,000

(Base Project Allocation - $400,000)

(ii) Blue Knob State Park
(A) Rehabilitate park facilities900,000

(Base Project Allocation - $900,000)

(B) Rehabilitate day use area1,000,000

(Base Project Allocation - $1,000,000)

(iii) Caledonia State Park
(A) Replace two bridges on main park road600,000

(Base Project Allocation - $600,000)

(B) Rehabilitate park campgrounds1,100,000

(Base Project Allocation - $1,100,000)

(iv) Codorus State Park
(A) Provide paving in park350,000

(Base Project Allocation - $350,000)

(iv.1) Cowans Gap State Park
(A) Replace main park road bridge over south branch of Little Aughwick Creek250,000
(iv.2) Delaware Canal State Park
(A) Repair Smithtown 5 bridge400,000
(B) Repair Paunacussing Creek canal wall150,000
(v) Denton Hill State Park
(A) Replace main park road/parking area400,000

(Base Project Allocation - $400,000)

(vi) Forest District 19
(A) Rehabilitate Egypt Meadows Dam750,000

(Base Project Allocation - $750,000)

(vii) Forest District 20
(A) Provide new resource management center4,000,000

(Base Project Allocation - $4,000,000)

(vii.1) Gifford Pinchot State Park
(A) Rehabilitate the camp area washhouse750,000
(vii.2) Greenwood Furnace State Park
(A) Pave roads in the campground160,000
(viii) Little Pine State Park
(A) Renovate restroom and lower picnic area300,000

(Base Project Allocation - $300,000)

(viii.1) Moraine State Park
(A) Replace drainage and repave road No. 10050, North Shore220,000
(ix) Moshannon State Forest
(A) Provide cleanup to Quehanna reactor site2,400,000

(Base Project Allocation - $2,400,000)

(ix.1) Nockamixon State Park
(A) Replace boat rental dock within the park300,000
(B) Pave main loop road and spurs at the modern cabin colony200,000
(ix.2) Ohiopyle State Park
(A) Construct shower house at Mitchell Field for boaters650,000
(ix.3) Pine Grove Furnace State Park
(A) Rehabilitate and repave park roads and parking lots within the park200,000
(ix.4) Presque Isle State Park
(A) Replenish beach sand mounds, Phase 3160,000
(ix.5) Regional Park/Forest District 13 Office
(A) Expand parking and renovate office facilities400,000
(x) Prince Gallitzin State Park
(A) Replace two restrooms at the park300,000

(Base Project Allocation - $300,000)

(B) Pave roads within the park350,000

(Base Project Allocation - $350,000)

(xi) Reeds Gap State Park
(A) Relocate park office building1,500,000

(Base Project Allocation - $1,500,000)

(B) Replace existing swimming pool1,000,000

(Base Project Allocation - $1,000,000)

(xi.1) Ricketts Glen State Park
(A) Repair sewage treatment plant and water system to comply with modern codes550,000
(xii) S.B. Elliott State Park
(A) Provide ADA cabins and renovate washhouse1,250,000

(Base Project Allocation - $1,250,000)

(xiii) Shawnee State Park
(A) Repair joints in concrete spillway300,000

(Base Project Allocation - $300,000)

(B) Provide for emergency spillway concrete and joint repair at the dam300,000
(xiv) Shikellamy State Park
(A) Project (PW 4182) to provide dock rehabilitation transient and launch areas663,000

(Base Project Allocation - $663,000)

(B) Renovate overlook road in the park400,000

(Base Project Allocation - $400,000)

(xv) Sinnemahoning State Park
(A) Repair dam spillway650,000

(Base Project Allocation - $650,000)

(xv.1) Tiadaghton State Forest
(A) Construct grade crossing for Pine Creek Trail at Jersey Shore250,000
(xvi) Various Parks and Forest Districts, Statewide
(A) Acquire land to be incorporated within the park system according to the Commonwealth's master plan10,000,000

(Land Allocation - $10,000,000)

Section 9. Itemization of Environmental Stewardship Fund projects.

Projects in the category of public improvement projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by current revenues of the Environmental Stewardship Fund are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Conservation and Natural Resources
(i) Bald Eagle State Park
(A) Rehabilitate roads within the park1,600,000

(Base Project Allocation - $1,600,000)

(B) Replace courtesy docks at eight public boat launches300,000

(Base Project Allocation - $300,000)

(C) Rehabilitate office and visitors center1,750,000

(Base Project Allocation - $1,750,000)

(D) Construct rustic inn within the park5,600,000
(ii) Beltzville State Park
(A) Rehabilitate sewage treatment plant and correct sewer line infiltration400,000

(Base Project Allocation - $400,000)

(iii) Bendigo State Park
(A) Replace bathhouse, lifeguard station and day-use restrooms in the park1,000,000

(Base Project Allocation - $1,000,000)

(iv) Canoe Creek State Park
(A) Rehabilitate sewage treatment plant300,000

(Base Project Allocation - $300,000)

(v) Chapman State Park
(A) Rehabilitate beach house and comfort station1,900,000

(Base Project Allocation - $1,900,000)

(vi) Cherry Springs State Park
(A) Replace pit latrines with flush restrooms and sewers770,000

(Base Project Allocation - $770,000)

(vii) Clear Creek State Park
(A) Rehabilitate water system and replace pit latrines2,000,000

(Base Project Allocation - $2,000,000)

(B) Rehabilitate park roads and bridges1,500,000

(Base Project Allocation - $1,500,000)

(vii.1) Codorus State Park
(A) Replace swimming pool and renovate bathhouse interior2,600,000
(viii) Colonel Denning State Park
(A) Provide new day restroom, sewage and shower house350,000

(Base Project Allocation - $350,000)

(B) Provide bathhouse, concession, restroom and sewage500,000

(Base Project Allocation - $500,000)

(ix) Cook Forest State Park
(A) Rehabilitation of trail, Phase II250,000

(Base Project Allocation - $250,000)

(B) Rehabilitate five campground washhouses600,000

(Base Project Allocation - $600,000)

(C) Replace park office and visitors center2,500,000

(Base Project Allocation - $2,500,000)

(D) Replace six river cabins2,200,000

(Base Project Allocation - $2,200,000)

(E) Rehabilitate sewage system and repairs750,000

(Base Project Allocation - $750,000)

(F) Provide repairs to the water system750,000

(Base Project Allocation - $750,000)

(G) Rehabilitate road and parking lot1,100,000

(Base Project Allocation - $1,100,000)

(H) Repair water system and rehabilitate booster station and water storage tanks600,000
(x) Colton Point State Park
(A) Replace two pit latrines with composting restroom, playground, picnic area and campground shower house1,500,000

(Base Project Allocation - $1,500,000)

(x.1) Delaware Canal State Park
(A) Replace Ferry Street Bridge500,000
(xi) Elk State Park
(A) Replace comfort station150,000

(Base Project Allocation - $150,000)

(xii) Erie Bluffs State Park
(A) Construct entrance to the park300,000

(Base Project Allocation - $300,000)

(xiii) Evansburg State Park
(A) Provide road paving for the park335,000

(Base Project Allocation - $335,000)

(B) Replace sewer lines250,000

(Base Project Allocation - $250,000)

(C) Replace temporary restrooms, Phase II250,000

(Base Project Allocation - $250,000)

(D) Construct sewage collection system to connect residences to municipal system250,000
(xiv) Forest District 2
(A) Construct new resource management center3,500,000

(Base Project Allocation - $3,500,000)

(xv) Forest District 3
(A) Establish new maintenance headquarter buildings in Juniata, Mifflin and Perry Counties800,000

(Base Project Allocation - $800,000)

(B) Rehabilitate Gunter Valley Dam in Perry County5,000,000
(Base Project Allocation - $5,000,000)
(xvi) Forest District 4
(A) Rehabilitate Linn Run Road2,500,000
(Base Project Allocation - $2,500,000)
(xvii) Forest District 5
(A) Rehabilitate resource management center1,500,000
(Base Project Allocation - $1,500,000)
(xviii) Forest District 8
(A) Rehabilitate Kittanning Resource Management Center1,500,000
(Base Project Allocation - $1,500,000)
(xix) Forest District 14
(A) Rehabilitate historic stone house250,000
(Base Project Allocation - $250,000)
(xx) Forest District 18
(A) SR 54 comfort station and parking500,000
(Base Project Allocation - $500,000)
(B) New resource management center3,500,000
(Base Project Allocation - $3,500,000)
(C) Rehabilitate Roaring Creek tract facilities600,000
(Base Project Allocation - $600,000)
(D) Rehabilitate Roaring Creek tract trails and bridges1,155,000
(Base Project Allocation - $1,155,000)
(E) Maintenance to Haldeman complex300,000
(Base Project Allocation - $300,000)
(xxi) Forest District 19
(A) New resource management center3,500,000
(Base Project Allocation - $3,500,000)
(B) Rehabilitate Little Summit Fire Station maintenance complex300,000
(Base Project Allocation - $300,000)
(C) Project for Pine Flats Road200,000
(Base Project Allocation - $200,000)
(D) Project for Flat Ridge Road200,000
(Base Project Allocation - $200,000)
(xxii) Forest District 20
(A) Pave Dry Run Road300,000
(Base Project Allocation - $300,000)
(B) Provide for Hillsgrove storage building300,000
(Base Project Allocation - $300,000)
(C) Pave High Knob Road500,000
(Base Project Allocation - $500,000)
(xxiii) Frances Slocum State Park
(A) Rehabilitate sewage treatment plant and lines1,500,000
(Base Project Allocation - $1,500,000)
(xxiv) French Creek State Park
(A) Rehabilitate Scotts Run area1,500,000
(Base Project Allocation - $1,500,000)
(xxv) Gifford Pinchot State Park
(A) Phase II rehabilitation of camp area washhouse400,000
(Base Project Allocation - $400,000)
(xxvi) Gouldsboro State Park
(A) Repair dam at the park750,000
(Base Project Allocation - $750,000)
(B) Replace pit bathhouse, comfort station and boat rental600,000
(Base Project Allocation - $600,000)
(xxvii) Greenwood Furnace State Park
(A) Make repairs to sewage treatment plant900,000
(Base Project Allocation - $900,000)
(xxviii) Hickory Run State Park
(A) Replace pit latrines and water tank1,800,000
(Base Project Allocation - $1,800,000)
(B) Phase II of group camp roof replacement200,000
(Base Project Allocation - $200,000)
(C) Replace office and visitors center2,000,000
(Base Project Allocation - $2,000,000)
(D) Replace pit toilets and four buildings1,250,000
(Base Project Allocation - $1,250,000)
(E) Replace four pit latrines at the campground and organized group camp with flush comfort stations2,000,000
(xxix) Hills Creek State Park
(A) Rehabilitate spillway600,000
(Base Project Allocation - $600,000)
(B) Provide office renovation addition and visitors center2,100,000
(Base Project Allocation - $2,100,000)
(xxx) Hyner Run State Park
(A) Rehabilitate two park bridges and pave roadway600,000
(Base Project Allocation - $600,000)
(B) Replace two day-use restrooms300,000
(Base Project Allocation - $300,000)
(xxxi) Kettle Creek State Park
(A) Provide bathhouse, shower house and sewage1,800,000
(Base Project Allocation - $1,800,000)
(xxxii) Kooser State Park
(A) Rehabilitate main park road and replace two bridges1,300,000
(Base Project Allocation - $1,300,000)
(xxxiii) Lackawanna State Park
(A) Replace park office1,500,000
(Base Project Allocation - $1,500,000)
(B) Rehabilitate pool complex and day-use area3,000,000
(Base Project Allocation - $3,000,000)
(xxxiv) Laurel Hill State Park
(A) Breach Spruce Run Dam250,000
(Base Project Allocation - $250,000)
(B) Provide Jones Mill Run Dam dredging250,000
(Base Project Allocation - $250,000)
(C) Rehabilitate group camp three sewage lines250,000
(Base Project Allocation - $250,000)
(D) Provide camping cottage shower house at the park650,000
(Base Project Allocation - $650,000)
(E) Rehabilitate contact station and parking500,000
(Base Project Allocation - $500,000)
(xxxv) Laurel Ridge State Park
(A) Replace turnpike trail bridge superstructure1,200,000
(Base Project Allocation - $1,200,000)
(xxxvi) Little Pine State Park
(A) Rehabilitate dam500,000
(Base Project Allocation - $500,000)
(xxxvii) Lyman Run State Park
(A) Provide construction to the spillway bridge500,000
(Base Project Allocation - $500,000)
(xxxviii) Marsh Creek State Park
(A) Pave all parking lots in the park325,000
(Base Project Allocation - $325,000)
(B) Provide ADA office expansion150,000
(Base Project Allocation - $150,000)
(xxxix) McConnells Mill State Park
(A) Rehabilitate the park road275,000
(Base Project Allocation - $275,000)
(xl) Moraine State Park
(A) Resurface bike trail in park1,200,000
(Base Project Allocation - $1,200,000)
(B) Rehabilitate Old 422 launch and road1,000,000
(Base Project Allocation - $1,000,000)
(xli) Neshaminy State Park
(A) Rehabilitate jetty350,000
(Base Project Allocation - $350,000)
(B) Rehabilitate pool concession building350,000
(xlii) Nockamixon State Park
(A) Provide paving in the park500,000
(Base Project Allocation - $500,000)
(B) Replace three pit toilets1,000,000
(Base Project Allocation - $1,000,000)
(xliii) Ohiopyle State Park
(A) Rehabilitate residence250,000
(Base Project Allocation - $250,000)
(B) Replace bridge 0902-CSX 2288300,000
(Base Project Allocation - $300,000)
(C) Construct parking above new office900,000
(Base Project Allocation - $900,000)
(D) Provide park office accessibility2,000,000
(Base Project Allocation - $2,000,000)
(E) Provide bathhouse, shower house and sewage275,000
(Base Project Allocation - $275,000)
(xliv) Oil Creek State Park
(A) Rehabilitate Boughton Bridge400,000
(Base Project Allocation - $400,000)
(B) Phase I to repair trail slips300,000
(Base Project Allocation - $300,000)
(xlv) Parker Dam State Park
(A) Rehabilitate dam spillway350,000
(Base Project Allocation - $350,000)
(xlvi) Park Region 1
(A) Rehabilitate surface water systems/filter300,000
(Base Project Allocation - $300,000)
(B) Rehabilitate surface and well water supplies in Region 1 State parks1,500,000
(Base Project Allocation - $1,500,000)
(xlvii) Park Region 2
(A) Rehabilitate the residence250,000
(Base Project Allocation - $250,000)
(xlviii) Pine Grove Furnace State Park
(A) Rehabilitate water treatment plant2,000,000
(Base Project Allocation - $2,000,000)
(B) Rehabilitate various buildings3,400,000
(Base Project Allocation - $3,400,000)
(xlix) Presque Isle State Park
(A) Provide bike trail extension to the Tom Ridge Environmental Center1,800,000
(Base Project Allocation - $1,800,000)
(l) Prince Gallitzin State Park
(A) Rehabilitate sewage treatment plant800,000
(Base Project Allocation - $800,000)
(B) Rehabilitate Beaver Valley Marina2,900,000
(Base Project Allocation - $2,900,000)
(li) Promised Land State Park
(A) Rehabilitate sewer line750,000
(Base Project Allocation - $750,000)
(B) Replace bridge and spillway3,100,000
(Base Project Allocation - $3,100,000)
(C) Rehabilitate Pickerel Point and Deerfield campgrounds3,000,000
(Base Project Allocation - $3,000,000)
(D) Rehabilitate boat rental area500,000
(Base Project Allocation - $500,000)
(E) Rehabilitate dump station300,000
(Base Project Allocation - $300,000)
(F) Rehabilitate bridges120,000
(Base Project Allocation - $120,000)
(lii) Pymatuning State Park
(A) Rehabilitate Espyville south launch and environs1,500,000
(Base Project Allocation - $1,500,000)
(B) Rehabilitate Jamestown beach house650,000
(Base Project Allocation - $650,000)
(C) Rehabilitate sanitary facilities on the west side2,200,000
(Base Project Allocation - $2,200,000)
(liii) Raccoon Creek State Park
(A) Provide roadway slip repairs800,000
(Base Project Allocation - $800,000)
(B) Phase II rehabilitation of roads300,000
(Base Project Allocation - $300,000)
(liv) Ralph Stover State Park
(A) Replace pit latrines and sewer500,000
(Base Project Allocation - $500,000)
(lv) Ricketts Glen State Park
(A) Rehabilitate bathhouse and comfort stations2,800,000
(Base Project Allocation - $2,800,000)
(B) Rehabilitate roads and provide paving for parking lots650,000
(Base Project Allocation - $650,000)
(C) Replace pit latrine at Route 118 picnic area400,000
(Base Project Allocation - $400,000)
(D) Repair infiltration, sewage treatment plant and water system550,000
(Base Project Allocation - $550,000)
(lvi) Ridley Creek State Park
(A) Reroof maintenance building400,000
(Base Project Allocation - $400,000)
(B) Pave parking lot300,000
(Base Project Allocation - $300,000)
(lvii) Salt Springs State Park
(A) Replace vault latrine300,000
(Base Project Allocation - $300,000)
(lviii) Samuel S. Lewis State Park
(A) Provide two new comfort stations with on-lot sewage750,000
(Base Project Allocation - $750,000)
(lix) Shawnee State Park
(A) Rehabilitate water treatment plant1,200,000
(Base Project Allocation - $1,200,000)
(lx) Sinnemahoning State Park
(A) Rehabilitate main park road and replace bridges1,000,000
(Base Project Allocation - $1,000,000)
(B) Replace two bridges on main park road500,000
(lxi) Sizerville State Park
(A) Modernize pit latrines and bathhouse2,000,000
(Base Project Allocation - $2,000,000)
(B) Provide new park office and visitors center1,800,000
(Base Project Allocation - $1,800,000)
(lxii) Tiadaghton State Forest
(A) Construct Tiadaghton Management Center4,500,000
(Base Project Allocation - $4,500,000)
(lxiii) Tobyhanna State Park
(A) Rehabilitate day-use area and campground2,500,000
(Base Project Allocation - $2,500,000)
(lxiv) Whipple Dam State Park
(A) Provide new multifunction beach building1,200,000
(Base Project Allocation - $1,200,000)
(lxv) Yellow Creek State Park
(A) Provide camping cottage shower house650,000
(Base Project Allocation - $650,000)
(lxv.1) Weiser State Forest
(A) Construct Weiser Resource Management Center3,500,000
(lxvi) White Clay Creek Preserve
(A) Rebuild London Tract wall150,000
(Base Project Allocation - $150,000)
(B) Reconstruct cemetery wall at London Tract Meeting House150,000
(lxvii) Worlds End State Park
(A) Rehabilitate campground and day-use area roads350,000
(Base Project Allocation - $350,000)
(lxviii) Various parks, Statewide
(A) Acquire land to be incorporated within the park system according to the Commonwealth's master plan10,000,000
(Land Allocation - $10,000,000)

Section 10. Itemization of State forestry bridge projects.

Projects in the category of State forestry bridge projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax) are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Cameron County
(i) Elk State Forest
(A) Replace Dents Run Bridge over Little Dents Run200,000
(1.1) Centre County
(i) Forest District 9
(A) Project for Meyers Run Road and Black Moshannon Creek400,000
(B) Project for North Run Road over Smays Run300,000
(ii) Moshannon State Forest
(A) Replace Gordon Road Bridge over Anderson Creek185,000
(2) Clearfield County
(i) Forest District 9
(A) Project for Shirks Road over Black Moshannon Creek, Bridge No. 9-0028300,000
(B) Project for Reservoir Road over Upper Three Run300,000
(C) Project for Little Medix Road over Little Medix Run, Bridge No. 9-0012300,000
(3) Clinton County
(i) Forest District 10
(A) Project for Beaver Dam Road over Beaver Dam Run300,000
(B) Project for Birch Island Road over Amos Branch, Bridge No. 10-0040300,000
(ii) Sproul State Forest
(A) Replace Beaver Dam Run Road over Beaver Dam Run, Bridge Nos. 10-9002, 10-9003 and 10-9004500,000
(4) Elk County
(i) Forest District 13
(A) Project for East Hicks Road over Barr Hollow300,000
(B) Project for Little Dents Road over Dents Run, Bridge No. 13-0032300,000
(C) Project for Dents Run Road over Little Bear Run300,000
(D) Project for Dents Run Road over Weatherboard Run300,000
(E) Project for bridge over North Fork300,000
(4.1) Franklin County
(i) Michaux State Forest
(A) Replace Biesecker Gap Road Bridge over Biesecker Run300,000
(5) Huntingdon County
(i) Forest District 5
(A) Project for Krise Valley Road Bridge300,000
(ii) Rothrock State Forest
(A) Replace Lingle Valley Road Bridge over Laurel Creek300,000
(B) Replace Pennsylvania Furnace Road Bridge over Globe Run300,000
(6) Lycoming County
(i) Forest District 12
(A) Project for Trout Run Road and bridges600,000
(B) Project for Frances Road over unnamed tributary near Black Forest Trail300,000
(ii) Tiadaghton State Forest
(A) Replace Francis Road Bridge over Randall Hollow, Pipeline Road Bridge over unnamed tributary and Bridge Nos. 9027, 9016, 9003 and 9004830,000
(7) Perry County
(i) Forest District 3
(A) Project for the Second Narrows Road bridge300,000
(8) Tioga County
(i) Forest District 12
(A) Project for Francis Road over unnamed tributary at Pipeline Road300,000
(B) Project for Francis Road over Woodward Hollow300,000
(C) Project for Francis Road over Randall Hollow, Bridge No. 12-9003300,000
(D) Project for Francis Road over Kramer Hollow, Bridge No. 12-9016300,000
(E) Project for Francis Road over Francis Branch, Bridge No. 12-0048300,000
(ii) Forest District 16
(A) Project for Spoor Hollow Road over Norris Brook, Bridge No. 16-0001300,000
(B) Project for Cedar Mountain Road over Cedar Run, Bridge No. 16-0014300,000
(9) Union County
(i) Forest District 7
(A) Replace Brandon Road bridge300,000
(B) Project for Cooper Mill Road bridge300,000
(ii) Bald Eagle State Forest
(A) Replace Brandon Road Bridge over North Buffalo Creek300,000
(10) Clearfield and Elk Counties
(i) Forest District 9
(A) Project for three culverts on Little Medix Road over Little Medix Run400,000

Section 11. Itemization of General Fund current revenue projects.

The individual capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns and to be financed from General Fund current revenues are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Corrections
(i) State Correctional Institution at Albion
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(ii) State Correctional Institution at Cambridge Springs
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(iii) State Correctional Institution at Greensburg
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(iv) State Correctional Institution at Houtzdale
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(v) State Correctional Institution at Laurel Highlands
(A) Lease and/or purchase two separate emergency housing facilities along with related infrastructure improvements4,000,000
(Base Project Allocation - $4,000,000)
(vi) State Correctional Institution at Mahanoy
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(vii) State Correctional Institution at Muncy
(A) Lease and/or purchase two separate emergency housing facilities along with related infrastructure improvements4,000,000
(Base Project Allocation - $4,000,000)
(viii) State Correctional Institution at Pine Grove
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(ix) State Correctional Institution at Retreat
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements3,500,000
(Base Project Allocation - $3,500,000)
(x) State Correctional Institution at Rockview
(A) Lease and/or purchase an emergency housing facility along with related infrastructure improvements2,500,000
(Base Project Allocation - $2,500,000)
(2) Pennsylvania Historical and Museum Commission
(i) Pennsylvania Military Museum
(A) Design and construct a 2,500-square-foot storage building for historical military vehicles600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)

Section 11.1. Itemization of Manufacturing Fund current revenue projects.

(a) Public improvement projects.--The individual capital projects in the category of public improvement projects to be developed by the Department of General Services, its successors or assigns for the Department of Corrections and to be financed from current revenues of the Manufacturing Fund are hereby itemized, together with their respective itemized costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Corrections
(i) State Correctional Institution at Frackville
(A) Modify an existing building into a regional laundry facility for correctional industries including laundry equipment3,000,000
(Base Project Allocation - $3,000,000)

Section 11.2. Itemization of Pennsylvania Fish and Boat Commission capital projects.

The individual capital projects in the category of public improvements projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to executive authorizations are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Pennsylvania Fish and Boat Commission
(i) Bedford County
(A) Design, rehabilitate and construct fish rearing facilities and related infrastructure, Reynoldsdale State Fish Hatchery9,300,000
(i.1) Butler County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Glade Run4,500,000
(ii) Centre County
(A) Design, replace or remodel Pleasant Gap Headquarters6,500,000
(iii) Cumberland County
(A) Design and construct a new dam according to current standards, Opossum Lake4,600,000
(B) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Opossum Lake4,000,000
(iv) Dauphin County
(A) Provide additional office space and work areas for administrative and technical needs and also for partners related to the commission's mission, Harrisburg Headquarters1,200,000
(v) Fayette County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Virgin Run Lake5,000,000
(vi) Jefferson County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Kyle Lake5,000,000
(vii) Lancaster County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Speedwell Forge Lake5,500,000
(viii) Northampton County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Minsi Lake3,500,000
(ix) Somerset County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Lake Somerset3,500,000
(x) Tioga County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Lake Nessmuk1,500,000
(xi) Washington County
(A) Rehabilitation and repairs, including infrastructure improvements, Dutch Fork Lake Dam9,000,000
(B) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Canonsburg Lake6,500,000
(xii) Wayne County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Lower Woods Pond Lake1,500,000
(B) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Belmont Lake1,500,000
(xiii) Westmoreland County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Donegal Lake4,500,000
(xiv) Wyoming County
(A) Design and construct a new dam according to current standards or renovate, reconstruct or demolish existing dam, Stevens Lake2,000,000

Section 11.3. Itemization of State ATV/Snowmobile Fund current revenue projects.

Projects in the category of State ATV/Snowmobile Fund projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from State ATV/Snowmobile Fund current revenue are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Monroe County
(i) Delaware State Forest
(A) Construct Dixon Miller ATV trail500,000
(ii) Sproul State Forest
(A) Construct an ATV trail over Beech Creek and Two Rock Run500,000

Section 11.4. Itemization of State transportation enhancement funds current revenue projects.

Projects in the category of State transportation enhancement funds projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from State transportation enhancement funds current revenue are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Bucks County
(i) Delaware Canal State Park
(A) Construct pedestrian towpath access through railroad at Conrail siding at Fairless Steel1,000,000

Section 11.5. Itemization of Motor License Fund projects.

The individual capital projects in the category of public improvement projects to be developed by the Department of General Services, its successors or assigns for the Department of Transportation and to be financed by the incurring of debt or from current revenues in the Motor License Fund are hereby itemized, together with their respective itemized costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Transportation
(i) Armstrong County
(A) Renovate the maintenance garage, District 10-1440,000
(B) Construct weld shop addition, District 10-1385,000
(ii) Bedford County
(A) Install new Bedford County garage HVAC system850,000
(iii) Butler County
(A) Replace boilers and install infrared heat, District 10-2600,000
(B) Install new HVAC system, District 102715,000
(C) Replace roof, District 10-2385,000
(D) Repair structural damage, District 10-2495,000
(iv) Carbon County
(A) Construct new vehicle wash bay550,000
(B) Renovate metal building360,000
(v) Centre County
(A) Construct new vehicle wash bay550,000
(vi) Clarion County
(A) Construct and repair new weigh station, District 10-3375,000
(vii) Columbia County
(A) Construct weld shop addition, District 3-1412,000
(viii) Crawford County
(A) Construct new vehicle wash bay550,000
(ix) Cumberland County
(A) Construct new vehicle wash bay550,000
(x) Delaware County
(A) Construct new vehicle wash bay550,000
(xi) Erie County
(A) Construct new vehicle wash bay550,000
(xii) Indiana County
(A) Construct new vehicle wash bay550,000
(B) Construct training and emergency operation center, District 10-0850,000
(C) Install new HVAC system, District 10-0440,000
(D) Install new HVAC system, District 10-4577,000
(xiii) Jefferson County
(A) Construct new vehicle wash bay550,000
(xiv) Juniata County
(A) Renovate front office, restroom and HVAC system and upgrade weld shop, District 2-9450,000
(xv) Lackawanna County
(A) Construct new vehicle wash bay550,000
(B) Renovate office, District 4-0715,000
(C) Replace roof, Lackawanna County garage633,000
(D) Renovate and expand parking lot and ramps, RSR Site 55660,000
(xvi) Lancaster County
(A) Construct new vehicle wash bay550,000
(xvii) McKean County
(A) Renovate front office and restroom and upgrade HVAC, District 2-5300,000
(xviii) Monroe County
(A) Construct new vehicle wash bay550,000
(B) Replace roof on Monroe County garage550,000
(xix) Montgomery County
(A) Repair garage parking deck, District 6-0 engineering office500,000
(B) Replace HVAC piping, District 6-0 engineering office300,000
(C) Construct new vehicle wash bay550,000
(D) Install new generator, District 6-0 office412,000
(xx) Northumberland County
(A) Construct preventative maintenance bay, District 3-4500,000
(B) Construct new preventative maintenance bay, District 3-4660,000
(xxi) Perry County
(A) Construct new vehicle wash bay550,000
(xxii) Philadelphia County
(A) Construct new vehicle wash bay550,000
(xxiii) Snyder County
(A) Demolish portion of old garage and construct bridge beam shop, District 3-5400,000
(xxiv) Susquehanna County
(A) Construct new vehicle wash bay550,000
(xxv) Venango County
(A) Install new HVAC system, District 1-0770,000
(xxvi) Wyoming County
(A) Make renovations and install new HVAC system, District 4-7660,000
(xxvii) York County
(A) Construct new hi-arch salt storage and additional buildings550,000
(B) Repair floor and repair or replace HVAC system, York County garage950,000

Section 11.6. Waiver provision.

Notwithstanding any provision to the contrary, there shall be no local or private match-funding requirements for the project under section 5(b)(1)(ii).

Section 12. Debt authorization.

(a) Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $5,972,762,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.

(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $173,481,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.

(c) Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $954,737,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d) Redevelopment assistance.--Subject to the limitation in section 317(b) of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $7,533,808,000 as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in a capital budget.

(e) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $96,199,000 as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

(f) Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $79,100,000 as may be found necessary to carry out the acquisition and construction of the Pennsylvania Fish and Boat Commission projects specifically itemized in this capital budget.

(g) Motor License Fund projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $24,144,000 as may be found necessary to carry out the acquisition and construction of the Motor License Fund projects specifically itemized in a capital budget.

Section 13. Issue of bonds.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 14.

Section 14. Estimated useful life and term of debt.

(a) Estimated useful life.--The General Assembly states that the estimated useful life of the public improvement projects itemized in this act is as follows:

(1) Public improvement projects, 30 years.

(2) Furniture and equipment projects, 10 years.

(3) Transportation assistance projects:

(i) Rolling stock, 15 years.

(ii) Passenger buses, 12 years.

(iii) Furniture and equipment, 10 years.

(iv) All others, 30 years.

(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.

Section 15. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $5,972,762,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $173,481,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $954,737,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount of $7,533,808,000 to be used by it exclusively to defray the financial cost of redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the moneys as required and certified by it to be legally due and payable.

(e) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount of $96,199,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Protection the moneys as required and certified by it to be legally due and payable.

(f) Pennsylvania Fish and Boat Commission projects.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Pennsylvania Fish and Boat Commission in the maximum amount of $79,100,000 to be used by it exclusively to defray the financial cost of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Pennsylvania Fish and Boat Commission the moneys as required and certified by it to be legally due and payable.

(g) Motor License Fund projects.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Motor License Fund to the Department of Transportation in the maximum amount of $24,144,000 to be used by it exclusively to defray the financial cost of the Motor License Fund projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

Section 16. Federal funds.

In addition to those funds appropriated in section 15, all moneys received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

Section 17. Delegation.

(1) Notwithstanding any provision of law to the contrary, the Department of General Services may delegate the design and construction of the project contained in section 3(9)(ix)(A) to Drexel University.

(2) For the public improvement projects specifically itemized in section 3(14), the Department of General Services may delegate the Authority to construct, improve, equip, furnish, maintain, acquire or operate such projects to the Philadelphia Regional Port Authority. Notwithstanding any provision of law to the contrary, the Philadelphia Regional Port Authority, at its discretion and subsequent to the aforementioned delegation, may contract with one or more of the tenant companies leasing or operating port facilities at the Port of Philadelphia for the purpose of constructing, improving, equipping, furnishing, maintaining, acquiring or operating the public improvement projects specifically itemized in section 3(14). Any project itemized in section 3(14) delegated to the Philadelphia Regional Port Authority for which the Authority contracts with a tenant company for the purpose of constructing, improving, equipping, furnishing, maintaining, acquiring or operating the project shall be exempt from the first paragraph of section 1 of the act of May 1, 1913 (P.L.155, No.104), referred to as the Separations Act, and the provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act, and any provisions of the law requiring the bidding of projects.

Section 18. Department of Corrections facilities.

(a) Preemption of local ordinances.--Capital projects in the category of public improvement projects specifically itemized for the Department of Corrections in section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), (xv)(B), (xvi) and (xix) and section 11(1) of this act are hereby authorized to be constructed, erected or acquired by the Department of General Services, its successors or assigns, of the Department of Corrections, notwithstanding any zoning ordinance, land use ordinance, building code or other regulation adopted or enacted by a political subdivision under the authority of any statute or under the authority of any home rule charter authorized and adopted under any statute or the Constitution of Pennsylvania.

(b) Preemption of local ordinances for 2005-2006 projects.--Capital projects in the category of public improvement projects specifically itemized for the Department of Corrections in section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July 7, 2006 (P.L.390, No.83), known as the Capital Budget Project Itemization Act of 2005-2006, are hereby authorized to be constructed, erected or acquired by the Department of General Services, its successors or assigns, of the Department of Corrections, notwithstanding any zoning ordinance, land use ordinance, building code or other regulation adopted or enacted by a political subdivision under the authority of any statute or under the authority of any home rule charter authorized and adopted under any statute or the Constitution of Pennsylvania.

(c) Preemption of local ordinances for 2001-2002 projects.--The capital projects in the category of public improvement projects specifically itemized for the Department of Corrections in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891, No.131), known as the Capital Budget Project Itemization Act of 2001-2002, are hereby authorized to be constructed, erected or acquired by the Department of General Services, its successors or assigns, of the Department of Corrections, notwithstanding any zoning ordinance, land use ordinance, building code or other regulation adopted or enacted by a political subdivision under the authority of any statute or under the authority of any home rule charter authorized and adopted under any statute or the Constitution of Pennsylvania.

Section 19. Special contract provisions for Department of Corrections projects.

The Department of General Services shall use the competitive sealed proposal method of source selection to enter into a design/build contract for the projects which are authorized in section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), (xvi) and (xix) and section 11(1). Notwithstanding the provisions of 62 Pa.C.S. § 322(6) (relating to specific construction powers, duties and procedures), the Department of General Services shall comply with the provisions of the act of May 1, 1913 (P.L.155, No.104), referred to as the Separations Act, by entering into a design/build contract which requires that the design/build contractor comply with the requirements of the Separations Act. The Secretary of the Budget shall give notification of any such design/build contracts to the chairman and minority chairman of the Appropriations Committee of the Senate and the chairman and minority chairman of the Appropriations Committee of the House of Representatives ten days prior to advertising for a developer.

Section 20. Special contract provisions for Department of Conservation and Natural Resources projects.

Any Department of Conservation and Natural Resources public improvement project-eligible expenditure of funds incurred prior to the effective date of this act which is directly related to a public improvement capital project itemized in section 3(3)(xxi) shall be considered eligible to be utilized as a portion of the expenditure of funds and may be considered as eligible for reimbursement from capital funds for a public improvement capital project itemized in section 3(3)(xxi).

Section 21. Department of General Services authorization.

(1) The Department of General Services is authorized, subject to executive approval and authorization, to construct the Family Court Building itemized in section 3(7)(iv)(E) by contract awarded by the Department of General Services or to acquire the Family Court Building by means of a lease with an option to purchase.

(2) The Department of General Services is authorized, subject to executive approval and authorization, to construct a terminal facility for fresh food distribution itemized in section 3(8)(ii)(B) of the act of June 22, 2004 (P.L.257, No.40), known as the Capital Budget Project Itemization Act of 2003-2004, by contract awarded by the Department of General Services or to acquire a terminal facility for fresh food distribution with an option to purchase.

Section 22. Special provisions for Pennsylvania Fish and Boat Commission projects.

Notwithstanding any other provision of law to the contrary, the individual capital projects in the category of public improvement projects to be acquired or developed by the Pennsylvania Fish and Boat Commission itemized in section 11.2(1)(iii), (v), (vi), (vii), (viii), (ix), (x), (xi), (xii), (xiii) and (xiv) may be financed by the incurring of debt repayable from the General Fund pursuant to executive authorizations.

Section 23. Special provisions relating to Chester Economic Development Authority.

Notwithstanding any other law to the contrary, the requirement of section 318 of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, shall provide the sole and exclusive requirements for bidding any portion of the project itemized in section 6(23)(ii)(b)(I) receiving any funds from State agencies, authorities and instrumentalities.

Section 24. Repeal.

Section 26.1(c) of the act of June 22, 2004 (P.L.257, No.40), known as the Capital Budget Project Itemization Act of 2003-2004, is repealed.

Section 25. Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects.

Section 26. Effective date.

This act shall take effect July 1, 2007, or immediately, whichever is later.