Tenant ordered to install heating consumption meters

27 C 96/86Tribunal de première instance24 nov. 1986Droit du bailAdmis

Extrait par Omnilex

Résumé Omnilex

The Düsseldorf Local Court ruled on the defendants’ counterclaim and ordered the plaintiff to fit the penthouse apartment with devices for recording heating-energy consumption. The apartment was described as comprising two rooms, a kitchen, hallway, and bathroom. The partial judgment was declared provisionally enforceable subject to the second defendant providing security of DM 3,500 through an unconditional, irrevocable, and unlimited guarantee from a German bank or savings bank. The decision followed an oral hearing held on 3 November 1986.

Texte intégral

Amtsgericht Düsseldorf — 27 C 96/86 — Teilurteil

Entscheidungsdatum: 1986-11-24

Aktenzeichen: 27 C 96/86

ECLI: ECLI:DE:AGD:1986:1124.27C96.86.00

Dokumenttyp: Teilurteil

Spruchkörper: Richter

Tenor

hat das Amtsgericht Düsseldorf

auf die mündliche Verhandlung vom 3. November 1986

durch den Richter am Amtsgericht X

für R e c h t erkannt:

Auf die Widerklage wird der Kläger verurteilt,

die "Penthouse-Wohnung", gelegen in X,

X-straße , X. Obergeschoss, bestehend aus

zwei Zimmern, Küche, Diele und Bad, mit Ausstattungen

zur Erfassung des Verbrauchs von Heizenergie zu versehen.

Das Urteil ist vorläufig vollstreckbar, wenn die Beklagte

zu 2. Sicherheit durch selbstschuldnerische, unbedingte

und unbefristete Bürgschaft einer deutschen Bank oder

Sparkasse über 3.500,- - DM leistet.

Mots-clés

tenancyheating costsenergy consumption recordingcounterclaimprovisional enforceability

The plaintiff must install the specified consumption-recording equipment.

Poursuivez vos recherches dans ChatGPT ou Claude

Connectez Omnilex pour rechercher dans le corpus juridique depuis votre assistant IA.