Pennsylvania Act 1992-143 — HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1991-1992 - ENACTMENT

act-1992-0-1431992 Pa. Act 143Law

Act text
HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1991-1992 - ENACTMENT
Act of Dec. 14, 1992, P.L. 894, No. 143Cl. 86

A SUPPLEMENT

To the act of December 8, 1982 (P.L.848, No.235), entitled "An act providing for the adoption of capital projects related to the repair, rehabilitation or replacement of highway bridges to be financed from current revenue or by the incurring of debt and capital projects related to highway and safety improvement projects to be financed from current revenue of the Motor License Fund," itemizing bridge projects.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1. Short title.

This act shall be known and may be cited as the Highway-Railroad and Highway Bridge Capital Budget Supplemental Act for 1991-1992.

Section 2. Definitions.

The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise:

"Account." The Highway Bridge Improvement Restricted Account within the Motor License Fund.

"Capital project." A capital project as defined in section 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as The Fiscal Code, and shall include a county or municipal bridge rehabilitation, replacement or improvement project as set forth in this act.

"Department." The Department of Transportation of the Commonwealth.

"Secretary." The Secretary of Transportation of the Commonwealth.

Section 3. Total authorization for bridge projects.

(a) Total projects.--The total authorization for the costs of the projects itemized pursuant to this act and to be financed from current revenue or by the incurring of debt shall be $1,725,780,000.

(b) State projects.--The authorization for capital projects in the category of highway projects to be constructed by the department, its successors or assigns, and to be financed by the incurring of debt or from the highway account, itemized in this act under the category of State bridges, is $1,197,411,000.

(c) Non-State projects.--The authorization for non-State highway bridge projects to be constructed by municipalities and to be financed in part with grants not exceeding 80% of the non-Federal share of the costs made to the local government municipalities by the department from revenues deposited in the account itemized in this act under the category of local bridges, is $528,369,000.

Section 4. Itemization of bridge projects.

The individual capital projects in the category of highway projects to be constructed by the department, its successors or assigns, and to be financed from current revenue or by the incurring of debt are hereby itemized, together with their estimated financial costs, in the following sections.

Section 5. Adams County.

(a) Local Bridges
(1) Oxford Township, T-496, Bridge over Conewago Creek, Bridge Replacement123,000
(Base Construction Allocation - $88,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(2) Abbottstown Borough, Country Club Road South, Bridge over Paradise Creek, Bridge Rehabilitation250,000
(Base Construction Allocation - $160,000) (Land Allocation - $40,000) (Design and Contingencies - $50,000)
(3) Hamilton Township, 700 Road over Muncey Run Creek, Bridge Rehabilitation200,000
(Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(4) Oxford Township, T-493, Kohler Mill Road Bridge, Bridge Replacement200,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(5) Reading Township, T-558, Plum Run Road, Bridge over Plum Run Creek, Bridge Replacement50,000
(Base Construction Allocation - $45,000) (Design and Contingencies - $5,000)
(b) State Bridges
(1) S.R.3038, Crooked Creek Road over Marsh Creek, Franklin Township, Bridge Replacement885,000
(Base Construction Allocation - $750,000) (Land Allocation - $10,000) (Design and Contingencies - $125,000)
(2) S.R.0234, King Street over Beaver Creek, East Berlin Borough, Bridge Replacement746,000
(Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $96,000)
(3) S.R.3005, Pumping Station Road over Plum Run Creek, Freedom Township, Bridge Replacement246,000
(Base Construction Allocation - $212,000) (Land Allocation - $10,000) (Design and Contingencies - $24,000)
(4) S.R.2012, Bridge over Alloway Creek, Mt. Joy and Germany Townships, Bridge Replacement510,000
(Base Construction Allocation - $436,000) (Land Allocation - $10,000) (Design and Contingencies - $64,000)
(5) S.R.4002, Bridge over Gettysburg Railroad, Butler Township, Bridge Replacement1,026,000
(Base Construction Allocation - $889,000) (Land Allocation - $5,000) (Design and Contingencies - $132,000)
(6) Pa.194, Bridge over Tributary, Beaver Creek, Abbottstown Borough, Bridge Replacement245,000
(Base Construction Allocation - $196,000) (Land Allocation - $10,000) (Design and Contingencies - $39,000)

Section 6. Allegheny County.

(a) Local Bridges
(1) Wilkins Township, Ivy Street Bridge, Bridge Replacement175,000
(Base Construction Allocation - $175,000)
(2) Wilkins Township, Russell Lane Bridge, Bridge Replacement175,000
(Base Construction Allocation - $175,000)
(3) Wilkins Township, Baker Street Bridge, Bridge Replacement250,000
(Base Construction Allocation - $250,000)
(4) Shaler Township, Anderson Road Bridge No.11 (WB11), Bridge Replacement380,000
(Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $75,000)
(5) Crescent Township, Riverview Road Bridge No.6 (FU06), Bridge Replacement755,000
(Base Construction Allocation - $650,000) (Land Allocation - $10,000) (Design and Contingencies - $95,000)
(6) Pitcairn Borough, 2nd Street Bridge over Dirty Camp Run Center and Wall Avenues, Bridge Replacement175,000
(Base Construction Allocation - $175,000)
(7) Rankin Borough, Kenmawr Avenue Bridge, Bridge Replacement175,000
(Base Construction Allocation - $175,000)
(8) Wall Borough, Spring Hill Bridge over Conrail, Wall Avenue and Pa. Route 30, Bridge Replacement2,882,000
(Base Construction Allocation - $2,882,000)
(9) Braddock and North Braddock Boroughs, Overland Bridge over Conrail, Bridge Replacement818,000
(Base Construction Allocation - $818,000)
(10) Pleasant Hills Borough, Pleasant Hills Boulevard Bridge No.2, Bridge Replacement1,000,000
(Base Construction Allocation - $400,000) (Land Allocation - $500,000) (Design and Contingencies - $100,000)
(11) Emsworth Borough, Gibson Street over Lowries Run, Bridge Replacement220,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $20,000)
(12) West View Borough, Martsolf Avenue Bridge over Center Avenue, Bridge Replacement660,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $60,000)
(13) West View Borough, Ridgewood Avenue Bridge over Center Avenue, Bridge Replacement660,000
(Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(14) Ben Avon Borough, Spruce Run Road (now Alder Drive and Avalon Borough Building), Bridge Replacement70,000
(15) Ben Avon Borough, Spruce Run Road near Building Mill Lumber Company, Bridge Replacement70,000
(Base Construction Allocation - $70,000)
(16) Emsworth Borough, Herron Avenue over Lowries Run, Bridge Replacement560,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(17) City of Pittsburgh, Greenfield Avenue Bridge No.39, Bridge Replacement1,150,000
(Base Construction Allocation - $1,000,000) (Design and Contingencies - $150,000)
(18) City of Pittsburgh, Corliss Tunnel No.18, Bridge Replacement1,575,000
(Base Construction Allocation - $1,400,000) (Design and Contingencies - $175,000)
(19) City of Pittsburgh, Mission Street Bridge East No.60, Bridge Replacement880,000
(Base Construction Allocation - $800,000) (Design and Contingencies - $80,000)
(20) City of Pittsburgh, Mission Street Bridge West No.60, Bridge Replacement1,550,000
(Base Construction Allocation - $1,400,000) (Design and Contingencies - $150,000)
(21) City of Pittsburgh, Acrata Way Bridge No.4, Bridge Replacement115,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $15,000)
(22) Port Authority of Allegheny County, Lowries Run Viaduct BMS No.02742900009004, Emsworth Bridge, Bridge Replacement126,000
(Base Construction Allocation - $126,000)
(23) Bethel Park Borough, Brownsville and Library Roads Bridge No.6 over Piney Fork Creek, Bridge Replacement490,000
(Base Construction Allocation - $385,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000)
(24) Bethel Park Borough, Kings School Road Bridge (PY02) over North Branch Piney Fork, Bridge Replacement265,000
(Base Construction Allocation - $225,000) (Design and Contingencies - $40,000)
(25) Bethel Park Borough, Bethel Church Road Bridge No.2 over Graesers' Run, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $50,000)
(26) Upper St. Clair Township, Painters' Run Bridge No.2, Bridge Rehabilitation95,000
(Base Construction Allocation - $75,000) (Design and Contingencies - $20,000)
(27) Upper St. Clair Township, Painters' Run Bridge No.8, Bridge Replacement290,000
(Base Construction Allocation - $250,000)
(Design and Contingencies - $40,000)
(28) City of Pittsburgh, Mcardle Viaduct No.2, Bridge Rehabilitation2,526,000
(Base Construction Allocation - $2,246,000) (Design and Contingencies - $280,000)
(29) Shaler Township, Hodil Street Bridge 1,000 Feet Northeast of Thompson Run Road, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Land Allocation - $25,000) (Design and Contingencies - $25,000)
(30) City of Pittsburgh, Fort Pitt Boulevard Eastbound, Bridge Reconstruction15,400,000
(Base Construction Allocation - $14,000,000) (Design and Contingencies - $1,400,000)
(31) Penn Hills, Universal Road Bridge over Upper Branch Plum Creek, Bridge Replacement550,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $150,000)
(32) City of Pittsburgh, Shadeland Avenue Bridge over Woods Run Avenue, Demolition Phase, Bridge Removal660,000
(Base Construction Allocation - $545,000) (Design and Contingencies - $115,000)
(33) Leetsdale Borough, Bridge over Conrail and S.R.0065, New Bridge Construction6,661,000
(Base Construction Allocation - $5,946,000) (Land Allocation - $100,000) (Design and Contingencies - $615,000)
(34) Munhall Borough, Steel Heritage Park Access Bridge over Conrail, Bridge Replacement2,500,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $250,000) (Design and Contingencies - $250,000)
(35) Jefferson Borough, State Street Bridge over Lobbs Run Road, Bridge Replacement100,000
(Base Construction Allocation - $100,000)
(b) State Bridges
(1) S.R.2017, Industry Road Bridge over Boyds Hollow Road, Elizabeth Township, Bridge Replacement500,000
(Base Construction Allocation - $300,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(2) S.R.0019, Marshall Avenue Ramp over Chateau Street, City of Pittsburgh, Bridge Rehabilitation4,120,000
(Base Construction Allocation - $3,700,000) (Land Allocation - $50,000) (Design and Contingencies - $370,000)
(3) S.R.0910, Indianola Road Bridge over Deer Creek, Harmar Township, Bridge Rehabilitation1,050,000
(Base Construction Allocation - $850,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(4) S.R.3001, Railroad Overhead over Millers Run Road, South Fayette Township, Bridge Replacement300,000
(Base Construction Allocation - $150,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(5) S.R.3026, Millers Run Road, Bridge over Millers Run, South Fayette Township, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(6) S.R.0366, Tarentum Bridge, Tarentum Borough and City of New Kensington, Bridge Painting3,320,000
(Base Construction Allocation - $3,000,000) (Land Allocation - $20,000)
(Design and Contingencies - $300,000)
(7) Crescent Street Bridge over Pine Creek, Borough of Etna, Bridge Replacement770,000
(Base Construction Allocation - $654,000) (Land Allocation - $39,000) (Design and Contingencies - $77,000)
(8) Montour Railroad, Trestle over Brightwood Road, Bethel Park Borough, Bridge Removal180,000
(Base Construction Allocation - $160,000) (Design and Contingencies - $20,000)
(9) Bridgeville/Bower Hill Road, Bridge No.1 over McLaughlin Run, Upper St. Clair Township, Bridge Replacement475,000
(Base Construction Allocation - $380,000) (Land Allocation - $5,000) (Design and Contingencies - $90,000)
(10) S.R.0051, Bridge over Lewis Run, Jefferson Borough, Bridge Replacement710,000
(Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000)
(11) Turnpike Ramp Bridge over S.R.0022, Monroeville Borough, Bridge Rehabilitation109,000
(Base Construction Allocation - $99,000) (Design and Contingencies - $10,000)
(12) Turnpike Ramp Bridge over S.R.0022 Business, Monroeville Borough, Bridge Rehabilitation401,000
(Base Construction Allocation - $365,000) (Design and Contingencies - $36,000)
(13) Wabash Bridge over Monongahela River, City of Pittsburgh, New Bridge Construction35,000,000
(Base Construction Allocation - $30,000,000) (Land Allocation - $2,000,000) (Design and Contingencies - $3,000,000)
(14) S.R.0376, Fort Pitt Bridge Ramp to I-376 Eastbound, City of Pittsburgh, Bridge Reconstruction22,600,000
(Base Construction Allocation - $20,500,000) (Design and Contingencies - $2,100,000)
(15) S.R.0051, Clairton Boulevard Bridge over Lewis Run, Pleasant Hills Borough, Bridge Replacement550,000
(Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(16) S.R.3018, Scheinbach Road over Lobbs Run, Jefferson Borough, Bridge Replacement450,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(17) S.R.3052, Greentree Road over Georges Run, Scott Township, Bridge Replacement400,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(18) S.R.3021, Ashland Avenue over Lobbs Run, Jefferson Borough, Bridge Replacement450,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(19) S.R.3013, Brownsville Road Extended over Piney Fork, South Park Township, Bridge Replacement500,000
(Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(20) S.R.3039, Walker Mill Road over Robinson Run, Collier Township, Bridge Rehabilitation1,450,000
(Base Construction Allocation - $1,200,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(21) S.R.0051, Clairton Boulevard Bridge over Lewis Run, Jefferson Borough, Bridge Replacement410,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000)
(22) S.R.3048, Noblestown Road Bridge over Robinson Run, Collier Township, Bridge Rehabilitation2,840,000
(Base Construction Allocation - $2,600,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000)
(23) S.R.3048, Noblestown Road, Bridge No.2 over Branch of Robinson Run, Collier Township, Bridge Replacement300,000
(Base Construction Allocation - $150,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(24) S.R.3048, Noblestown Road, Bridge No.3 over Branch of Robinson Run, Collier Township, Bridge Replacement300,000
(Base Construction Allocation - $150,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(25) S.R.3048, Noblestown Road, Bridge No.4 over Scots Run, Collier Township, Bridge Replacement300,000
(Base Construction Allocation - $150,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(26) S.R.4048, Grubbs Road Bridge, McCandless Township, Bridge Replacement540,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $40,000)
(27) S.R.4086, Pine Creek Road Bridge over Pine Creek, McCandless Township, Bridge Replacement590,000
(Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $40,000)

Section 7. Armstrong County.

(a) Local Bridges
(1) Wayne Township, T-738, Cogler Bridge over South Fork Pine Creek, Bridge Replacement476,000
(Base Construction Allocation - $421,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(2) Valley Township, T-590, Pine Furnace Bridge over South Fork Pine Creek, Bridge Replacement554,000
(Base Construction Allocation - $499,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(3) East Franklin Township, T-530, Glade Run Bridge over Glade Run, Bridge Replacement299,000
(Base Construction Allocation - $256,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(4) Boggs Township, T-529, South Fork Pine Creek Bridge over South Fork Pine Creek, Bridge Replacement567,000
(Base Construction Allocation - $512,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(5) Washington Township, T-396, Simpson Bridge over Huling Run, Bridge Replacement347,000
(Base Construction Allocation - $302,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(6) Plum Creek Township, Johnston Bridge over South Branch Plum Creek, Bridge Replacement470,000
(Base Construction Allocation - $415,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(7) Plum Creek Township, Gastown Bridge over Plum Creek, Bridge Replacement513,000
(Base Construction Allocation - $463,000) (Land Allocation - $5,000) (Design and Contingencies - $45,000)
(8) Redbank Township, T-771, Lower McWilliams, County Bridge No.21 over Pine Creek, Bridge Replacement764,000
(Base Construction Allocation - $624,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000)
(b) State Bridges
(1) S.R.4023 Bridge over Limestone Run, East Franklin Township, Bridge Construction590,000
(Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000)
(2) S.R.1040 Bridge over Conrail, Kittanning Borough, Bridge Construction1,640,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000)
(3) S.R.3004, Cornplanter Run Bridge over Cornplanter Run, South Buffalo Township, Bridge Replacement245,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(4) S.R.4023, Tarrtown Road Bridge over Limestone Run, East Franklin Township, Bridge Replacement1,300,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000)
(5) S.R.2058, Bridge over Carnahan Run, Parks Township, Bridge Replacement405,000
(Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $75,000)
(6) S.R.2030, Bridge over Carnahan Run, Parks Township, Bridge Replacement460,000
(Base Construction Allocation - $350,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000)
(7) S.R.1034, Bridge over North Fork of Pine Creek, Boggs Township, Bridge Replacement330,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(8) S.R.2040, Bridge over Branch of Long Run, Kiskiminetas Township, Bridge Replacement330,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(9) S.R.0356, Bridge over Kiskiminetas River between Allegheny Township, Westmoreland County and Gilpin Township, Armstrong County13,000,000
(Base Construction Allocation - $13,000,000)
(10) S.R.0356, Bridge over Allegheny River between Gilpin Township, Armstrong County and South Buffalo Township, Armstrong County26,000,000
(Base Construction Allocation - $26,000,000)

Section 8. Beaver County.

(a) Local Bridges
(1) Beaver Falls and New Brighton Boroughs, Tenth Street Bridge over Beaver River, Bridge Removal2,030,000
(Base Construction Allocation - $1,950,000) (Design and Contingencies - $80,000)
(2) Economy Borough, T-606 Tevebaugh Bridge No.5 over Tevebaugh Run, Bridge Replacement205,000
(Base Construction Allocation - $143,000) (Land Allocation - $55,000) (Design and Contingencies - $7,000)
(3) City of Aliquippa, Hollywood Bridge over Tributary of Logtown Run, Bridge Replacement1,109,000
(Base Construction Allocation - $1,023,000) (Design and Contingencies - $86,000)
(4) Bridgewater Borough and Brighton Township, Beaver Hollow Road Bridge over PL&E Railroad, Bridge Replacement8,000,000
(Base Construction Allocation - $7,000,000) (Land Allocation - $400,000) (Design and Contingencies - $600,000)
(5) Borough of Fallston, Fallston Bridge over Beaver River, Bridge Rehabilitation95,000
(6) New Brighton Borough, Pittsfield Alley Bridge over Blockhouse Run, Bridge Replacement215,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(b) State Bridges
(1) S.R.0060, Beaver Valley Expressway over Brady's Run Road, Brighton Township, Bridge Rehabilitation535,000
(Base Construction Allocation - $500,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(2) S.R.0060, Vanport Bridge over Ohio River, Vanport Township, Bridge Rehabilitation2,200,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(3) S.R.0051, Taggert Road Bridge over Conrail, Darlington Township, Bridge Replacement2,000,000
(Base Construction Allocation - $1,800,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(4) S.R.4039, Bridge over Six Mile Run, Brighton Township, Bridge Replacement200,000
(Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(5) S.R.4031 over Brady Run Tributary, Brighton Township, Bridge Replacement212,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $22,000)
(6) S.R.0068, McKinleys Run Bridge over McKinleys Run, Rochester Township, Bridge Replacement201,000
(Base Construction Allocation - $177,000) (Land Allocation - $2,000) (Design and Contingencies - $22,000)
(7) S.R.0168, Bealer Run, Ohioville Borough, Bridge Replacement286,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $26,000)
(8) Ambridge - Aliquippa Bridge over Ohio River, Ambridge and Aliquippa Boroughs, New Bridge Construction5,000,000
(9) S.R.3016, Green Garden Road Bridge, Raccoon and Hopewell Townships, Bridge Replacement1,660,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000)
(10) S.R.0018, New Sharon Bridge over Beaver River, Bridgewater Borough and Rochester Township, Bridge Replacement8,000,000

Section 9. Bedford County.

(a) Local Bridges
(1) Southampton Township, T-306, Township Bridge No.1 over Black Valley Creek, Bridge Replacement360,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(2) Napier Township, T-443, County Bridge No.15 over Shawnee Creek, Bridge Rehabilitation600,000
(Base Construction Allocation - $540,000) (Land Allocation - $5,000) (Design and Contingencies - $55,000)
(3) Harrison Township, T-418, County Bridge No.18 over Juniata River, Bridge Rehabilitation660,000
(Base Construction Allocation - $600,000) (Land Allocation - $5,000) (Design and Contingencies - $55,000)
(4) Harrison Township, T-424, County Bridge No.30 over Buffalo Run, Bridge Rehabilitation135,000
(Base Construction Allocation - $120,000) (Land Allocation - $3,000) (Design and Contingencies - $12,000)
(5) Londonderry Township, T-358, County Bridge No.22 over Little Wills Creek, Bridge Rehabilitation125,000
(Base Construction Allocation - $110,000) (Land Allocation - $3,000) (Design and Contingencies - $12,000)
(6) Broad Top Township, T-551, Bridge No.4 over Six Mile Run, Bridge Replacement438,000
(Base Construction Allocation - $359,000) (Land Allocation - $25,000) (Design and Contingencies - $54,000)
(7) Broad Top Township, T-583, Bridge No.1 over Sandy Creek, Bridge Replacement359,000
(Base Construction Allocation - $290,000) (Land Allocation - $25,000) (Design and Contingencies - $44,000)
(8) Bedford Township, T-508, Bridge No.5 over Tributary of Dunning Creek, Bridge Replacement321,000
(Base Construction Allocation - $257,000) (Land Allocation - $25,000) (Design and Contingencies - $39,000)
(9) Bedford Township, T-482, Bridge No.4 over Valley Run, Bridge Replacement321,000
(Base Construction Allocation - $257,000) (Land Allocation - $25,000) (Design and Contingencies - $39,000)
(10) Colerain Township, T-373, Sherry Road Bridge over Cove Creek, Bridge Replacement491,000
(Base Construction Allocation - $405,000) (Land Allocation - $25,000) (Design and Contingencies - $61,000)
(11) East St. Clair Township, T-518, Wiper Blade Bypass Bridge over Adams Run, Bridge Replacement350,000
(Base Construction Allocation - $282,000) (Land Allocation - $25,000) (Design and Contingencies - $43,000)
(12) Bloomfield Township, T-608, Potter Creek Tributary Bridge over Potter Creek Tributary, Bridge Replacement321,000
(Base Construction Allocation - $257,000) (Land Allocation - $25,000) (Design and Contingencies - $39,000)
(13) Londonderry Township, T-328, Township Bridge No.1 over Little Wills Creek, Bridge Replacement467,000
(Base Construction Allocation - $384,000) (Land Allocation - $25,000) (Design and Contingencies - $58,000)
(14) Southampton Township, T-305, Hewitt Covered Bridge over Town Creek, Bridge Rehabilitation635,000
(Base Construction Allocation - $550,000) (Land Allocation - $5,000) (Design and Contingencies - $80,000)
(b) State Bridges
(1) Interchange, U.S.30 - S.R.8005 Bridge, Bedford Township, Bridge Rehabilitation430,000
(Base Construction Allocation - $380,000) (Design and Contingencies - $50,000)
(2) S.R.0030, Mt. Dallas Bridge over a Private Road, West Providence Township, Bridge Rehabilitation330,000
(Base Construction Allocation - $290,000) (Design and Contingencies - $40,000)
(3) S.R.0030 Everett Viaduct over Pa.26, Bridge Rehabilitation459,000
(Base Construction Allocation - $405,000) (Design and Contingencies - $54,000)
(4) S.R.0056, South Cessna Interchange, Bedford Township, Bridge Rehabilitation624,000
(Base Construction Allocation - $552,000) (Design and Contingencies - $72,000)
(5) S.R.1007, Tatesville Interchange, Bridge over U.S.220, West Providence Township, Bridge Rehabilitation283,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $33,000)
(6) S.R.0096, Bard Bridge over Little Wills Creek, Harrison Township, Bridge Replacement815,000
(Base Construction Allocation - $675,000) (Land Allocation - $50,000) (Design and Contingencies - $90,000)
(7) S.R.0220, Northbound Bridge over Raystown Branch of Juniata River, Bedford County, Bridge Rehabilitation2,430,000
(Base Construction Allocation - $2,185,000) (Land Allocation - $25,000) (Design and Contingencies - $220,000)
(8) S.R.0220, Northbound Bridge over Turnpike, Bedford Township, Bridge Rehabilitation1,290,000
(Base Construction Allocation - $1,150,000) (Land Allocation - $25,000) (Design and Contingencies - $115,000)
(9) S.R.0220, Southbound Bridge over Raystown Branch of Juniata River, Bedford Township, Bridge Rehabilitation2,420,000
(Base Construction Allocation - $2,176,000) (Land Allocation - $25,000) (Design and Contingencies - $219,000)
(10) S.R.0220, Southbound Bridge over Turnpike, Bedford Township, Bridge Rehabilitation1,290,000
(Base Construction Allocation - $1,150,000) (Land Allocation - $25,000) (Design and Contingencies - $115,000)
(11) S.R.1005, South Cemetery Bridge over Beaver Creek, South Woodbury Township, Bridge Replacement730,000
(Base Construction Allocation - $602,000) (Land Allocation - $50,000) (Design and Contingencies - $78,000)
(12) S.R.1009, North Cypher Bridge over Yellow Creek, Hopewell Township, Bridge Rehabilitation880,000
(Base Construction Allocation - $733,000) (Land Allocation - $50,000) (Design and Contingencies - $97,000)
(13) S.R.1009, Eichelbergertown Bridge over Yellow Creek, Hopewell Township, Bridge Rehabilitation1,075,000
(Base Construction Allocation - $861,000) (Land Allocation - $100,000) (Design and Contingencies - $114,000)
(14) S.R.1022, Yellow Creek Village Bridge over Yellow Creek, Hopewell Township, Bridge Rehabilitation745,000
(Base Construction Allocation - $591,000) (Land Allocation - $75,000) (Design and Contingencies - $79,000)
(15) S.R.2024, West Gapsville Bridge over Brush Creek, East Providence Township, Bridge Rehabilitation492,000
(Base Construction Allocation - $406,000) (Land Allocation - $25,000) (Design and Contingencies - $61,000)
(16) S.R.3009, Koon Lake Dam Bridge over Koon Dam, Cumberland Valley Township, Bridge Rehabilitation2,525,000
(Base Construction Allocation - $2,274,000) (Land Allocation - $25,000) (Design and Contingencies - $226,000)
(17) S.R.3017, North Sulphur Springs Bridge over Tributary of Buffalo Run, Harrison Township, Bridge Replacement468,000
(Base Construction Allocation - $385,000) (Land Allocation - $25,000) (Design and Contingencies - $58,000)
(18) S.R.3017, South Manns Choice Bridge over Cove Run, Harrison Township, Bridge Replacement514,000
(Base Construction Allocation - $425,000) (Land Allocation - $25,000) (Design and Contingencies - $64,000)
(19) S.R.4027, South Kimmel Bridge over Scrubgrass Creek, Kimmel Township, Bridge Replacement453,000
(Base Construction Allocation - $372,000) (Land Allocation - $25,000) (Design and Contingencies - $56,000)
(20) S.R.0036, East Loysburg Bridge over Tributary of Yellow Creek, South Woodbury Township, Bridge Replacement1,700,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(21) S.R.4032, Reynoldsdale Bridge over Tributary of Dunning Creek, East St. Clair Township, Bridge Replacement321,000
(Base Construction Allocation - $257,000) (Land Allocation - $25,000) (Design and Contingencies - $39,000)

Section 10. Berks County.

(a) Local Bridges
(1) Marion Township, T-498, Scharff Road over Tulpehocken Creek, Bridge Replacement740,000
(Base Construction Allocation - $630,000) (Land Allocation - $40,000) (Design and Contingencies - $70,000)
(2) Oley Township, T-595, Yoder Road over Oysterville Creek, Bridge Replacement250,000
(Base Construction Allocation - $210,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(3) Wyomissing Borough, Lauers Lane over Wyomissing Creek, Bridge Replacement320,000
(Base Construction Allocation - $275,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000)
(4) South Heidelberg Township, T-382, Furnace Road Bridge over Manor Creek, Bridge Replacement301,000
(Base Construction Allocation - $250,000) (Land Allocation - $21,000) (Design and Contingencies - $30,000)
(5) Borough of Wyomissing, North Wyomissing Boulevard, Bridge under Conrail Belt Line, Bridge Replacement2,925,000
(Base Construction Allocation - $2,500,000) (Land Allocation - $100,000) (Design and Contingencies - $325,000)
(6) Robeson Township, Old River Road, Seidel Creek Bridge, Bridge Replacement50,000
(b) State Bridges
(1) S.R.0222 under S.R.0422, City of Reading, Bridge Replacement163,000
(Base Construction Allocation - $148,000) (Design and Contingencies - $15,000)
(2) S.R.0222 under S.R.0422, City of Reading, Bridge Replacement262,000
(Base Construction Allocation - $238,000) (Design and Contingencies - $24,000)
(3) S.R.0501 over I-78, Bethel Township, Bridge Replacement1,100,000
(Base Construction Allocation - $1,000,000) (Design and Contingencies - $100,000)
(4) S.R.0422 over Railroad, City of Reading, Bridge Replacement410,000
(Base Construction Allocation - $372,000) (Design and Contingencies - $38,000)
(5) S.R.0222 over Railroad, West Reading Borough, Bridge Replacement2,187,000
(Base Construction Allocation - $1,988,000) (Design and Contingencies - $199,000)
(6) S.R.0422 over Schuylkill River, City of Reading, Bridge Replacement2,033,000
(Base Construction Allocation - $1,848,000) (Design and Contingencies - $185,000)
(7) S.R.0422 over Railroad, Cumru Township, Bridge Replacement527,000
(Base Construction Allocation - $479,000) (Design and Contingencies - $48,000)
(8) S.R.0422 over Schuylkill River, Cumru Township, Bridge Replacement1,345,000
(Base Construction Allocation - $1,222,000) (Design and Contingencies - $123,000)
(9) S.R.2032, Hill Church Road over a Tributary of West Swamp Creek, Bridge Replacement215,000
(Base Construction Allocation - $175,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(10) S.R.0082, Birdsboro Bridge over Schuylkill River, Birdsboro Borough, Bridge Rehabilitation2,500,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000)
(11) S.R.0183, Schuylkill Avenue Bridge over Schuylkill River, City of Reading, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(12) S.R.0222, Bridge over Pa.737 Northbound, Maxatawny Township, Bridge Rehabilitation480,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $80,000)
(13) S.R.1003, Ontelaunee Bridge over Lake Ontelaunee, Maiden Creek Township, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(14) S.R.2005, Bingaman Street Bridge over Schuylkill River, City of Reading, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(15) S.R.4028, State Street Bridge over Schuylkill River, Borough of Hamburg and Tilden Township, Bridge Replacement10,000,000

Section 11. Blair County.

(a) Local Bridges
(1) Frankstown Township, T-444, Falling Springs, South of Canoe Creek, Bridge Replacement270,000
(Base Construction Allocation - $225,000) (Land Allocation - $20,000) (Design and Contingencies - $25,000)
(2) Logan Township, 14th Avenue over Mill Run Stream, Bridge Replacement200,000
(Base Construction Allocation - $175,000) (Design and Contingencies - $25,000)
(3) North Woodbury Township, T-338, Central High Road near Martinsburg Disposal Plant, Bridge Replacement90,000
(Base Construction Allocation - $75,000) (Land Allocation - $10,000) (Design and Contingencies - $5,000)
(4) Juniata Township, T-371, Hauch Bridge over Bobs Creek, Bridge Replacement415,000
(Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $50,000)
(5) Frankstown Township, T-378, County Bridge No.6 over Town Run, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(6) City of Altoona, Park Avenue Bridge over Spring Run, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(7) Freedom Township, T-387, Bridge over McDonald Run, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(8) Hollidaysburg Borough, Bedford Street Bridge No.1 over Drainage Swale Tributary of Beaverdam Branch of Juniata River, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(9) Hollidaysburg Borough, Bedford Street Bridge No.2 over Tributary of Beaverdam Branch of Juniata River, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(10) Hollidaysburg Borough, River Street Bridge No.3 over Tributary of Beaverdam Branch of Juniata River, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(11) Hollidaysburg Borough, McDonald Alley Bridge No.4 over Tributary of Beaverdam Branch of Juniata River, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(12) Logan Township, T-406, Bridge over Burgoon Run, Bridge Replacement500,000
(Base Construction Allocation - $350,000) (Land Allocation - $75,000) (Design and Contingencies - $75,000)
(13) Logan Township, Pine Street Bridge over Brush Run, Bridge Rehabilitation900,000
(Base Construction Allocation - $500,000) (Land Allocation - $250,000) (Design and Contingencies - $150,000)
(b) State Bridges
(1) S.R.0022, Segment 0350, Offset 0000, Berwind Bridge over Brush Run, Frankstown Township, Bridge Replacement760,000
(Base Construction Allocation - $650,000) (Land Allocation - $25,000) (Design and Contingencies - $85,000)
(2) S.R.0036, Segment 0120, Offset 0000, North Roaring Spring Bridge over Halter Creek, Taylor Township, Bridge Replacement950,000
(Base Construction Allocation - $800,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(3) S.R.0220, Segment 0190, Offset 0000, Newry Bridge over Poplar Run, Newry Borough, Bridge Rehabilitation750,000
(Base Construction Allocation - $575,000) (Land Allocation - $100,000) (Design and Contingencies - $75,000)
(4) S.R.2010, Segment 0010, Offset 0643, East Freedom Bridge over Frankstown Branch of Juniata River, Freedom Township, Bridge Replacement920,000
(Base Construction Allocation - $790,000) (Land Allocation - $25,000) (Design and Contingencies - $105,000)
(5) S.R.2014, Segment 0040, Offset 0000, Sam Rea Bridge over Beaverdam Branch of Juniata River, Hollidaysburg Borough, Bridge Rehabilitation1,210,000
(Base Construction Allocation - $985,000) (Land Allocation - $100,000)
(Design and Contingencies - $125,000)
(6) S.R.2014, Segment 0070, Offset 0000, Loop Bridge over Frankstown Branch of Juniata River, Blair Township, Bridge Rehabilitation1,185,000
(Base Construction Allocation - $985,000) (Land Allocation - $75,000) (Design and Contingencies - $125,000)
(7) S.R.0220, Tyrone Viaduct over S.R.0453, S.R.1012 and Juniata River, Tyrone Borough, Bridge Rehabilitation1,294,000
(Base Construction Allocation - $1,142,000) (Design and Contingencies - $152,000)
(8) S.R.0220, Bald Eagle Ramp Bridge over Bald Eagle Creek, Snyder Township, Bridge Rehabilitation336,000
(Base Construction Allocation - $297,000) (Design and Contingencies - $39,000)
(9) S.R.0220, North Bald Eagle Ramp Bridge over Railroad, Snyder Township, Bridge Rehabilitation246,000
(Base Construction Allocation - $217,000) (Design and Contingencies - $29,000)
(10) S.R.4013, 17th Street Bridge over S.R.4009 and Conrail Railroad, Altoona City, Bridge Rehabilitation240,000
(Base Construction Allocation - $212,000) (Design and Contingencies - $28,000)
(11) S.R.4013, 8th Street Bridge, Altoona City, Bridge Rehabilitation646,000
(Base Construction Allocation - $570,000) (Design and Contingencies - $76,000)
(12) S.R.8005, Tyrone Viaduct On-Ramp at S.R.1012, Railroad and Juniata River, Tyrone Borough, Bridge Rehabilitation528,000
(Base Construction Allocation - $466,000) (Design and Contingencies - $62,000)
(13) S.R.8005, Tyrone Viaduct Off-Ramp over S.R.1012, Railroad and Juniata, Tyrone Borough, Bridge Rehabilitation725,000
(Base Construction Allocation - $640,000) (Design and Contingencies - $85,000)
(14) S.R.0022, Blair Street Bridge over Beaverdam Branch of Juniata River, Hollidaysburg Borough, Bridge Rehabilitation920,000
(Base Construction Allocation - $726,000) (Land Allocation - $100,000) (Design and Contingencies - $94,000)
(15) S.R.0036, McKee Bridge over Railroad, Freedom Township, Bridge Replacement1,467,000
(Base Construction Allocation - $1,242,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(16) S.R.0220, South Bellwood Bridge over Little Juniata River, Antis Township, Bridge Replacement1,350,000
(Base Construction Allocation - $1,176,000) (Land Allocation - $50,000) (Design and Contingencies - $124,000)
(17) S.R.0764, 31st Street Bridge over Mill Run, City of Altoona, Bridge Rehabilitation554,000
(Base Construction Allocation - $395,000) (Land Allocation - $100,000) (Design and Contingencies - $59,000)
(18) S.R.4004, Goods Lane Bridge over Mill Run, City of Altoona, Bridge Replacement810,000
(Base Construction Allocation - $650,000) (Land Allocation - $75,000) (Design and Contingencies - $85,000)
(19) S.R.4013, Juniata Shop Bridge over Spring Run, City of Altoona, Bridge Replacement810,000
(Base Construction Allocation - $650,000) (Land Allocation - $75,000) (Design and Contingencies - $85,000)
(20) S.R.4004, Burgoon Run Bridge over Burgoon Run, Allegheny Township, Bridge Replacement700,000
(Base Construction Allocation - $450,000) (Land Allocation - $150,000) (Design and Contingencies - $100,000)
(21) S.R.1007, Pine Street Bridge over Brush Run, Logan Township, Bridge Replacement700,000
(Base Construction Allocation - $475,000) (Land Allocation - $150,000) (Design and Contingencies - $75,000)

Section 12. Bradford County.

(a) Local Bridges
(1) Rome Township, T-748, Bridge over Bullard Creek, Bridge Replacement280,000
(Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(2) Sheshequin Township, T-730, Bridge No.26 over Spalding Creek, Bridge Replacement263,000
(Base Construction Allocation - $214,000) (Land Allocation - $10,000) (Design and Contingencies - $39,000)
(3) West Burlington Township, T-328, Bridge No.8 over Sugar Creek, Bridge Replacement317,000
(Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $47,000)
(4) Canton Township, T-310, Bridge No.11 over Towanda Creek, Bridge Replacement216,000
(Base Construction Allocation - $174,000) (Land Allocation - $10,000) (Design and Contingencies - $32,000)
(5) Monroe Township, T-412, Bridge No.20 over South Branch Towanda Creek, Bridge Replacement313,000
(Base Construction Allocation - $256,000) (Land Allocation - $10,000) (Design and Contingencies - $47,000)
(6) South Creek Township, T-78, Bridge No.27 over South Creek, Bridge Replacement166,000
(Base Construction Allocation - $131,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(7) Leroy Township, T-330, Bridge No.16 over Towanda Creek, Bridge Replacement443,000
(Base Construction Allocation - $367,000) (Land Allocation - $10,000) (Design and Contingencies - $66,000)
(8) Windham Township, T-760, Bridge No.40 over Wappasening Creek, Bridge Replacement468,000
(Base Construction Allocation - $388,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(9) Wells Township, T-751, Bridge No.37 over Beckwith Creek, Bridge Replacement302,000
(Base Construction Allocation - $247,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(10) Rome Township, T-764, Bridge No.44 over Bullard Creek, Bridge Replacement306,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $46,000)
(11) North Towanda Township, T-545, Bridge No.32 over Sugar Creek, Bridge Replacement450,000
(Base Construction Allocation - $372,000) (Land Allocation - $10,000) (Design and Contingencies - $68,000)
(12) Burlington Township, T-552, Bridge No.6 over Sugar Creek, Bridge Replacement454,000
(Base Construction Allocation - $376,000) (Land Allocation - $10,000) (Design and Contingencies - $68,000)
(13) Leroy Township, T-320, Bridge No.18 over Towanda Creek, Bridge Replacement288,000
(Base Construction Allocation - $235,000) (Land Allocation - $10,000) (Design and Contingencies - $43,000)
(14) Burlington Township, T-522, Bridge over Sugar Creek, Bridge Replacement969,000
(Base Construction Allocation - $775,000) (Land Allocation - $48,000) (Design and Contingencies - $146,000)
(15) Rome Township, T-784, Bridge over Bullard Creek, Bridge Replacement677,000
(Base Construction Allocation - $542,000) (Land Allocation - $34,000) (Design and Contingencies - $101,000)
(16) South Creek Township, T-781, Bridge over South Creek, Bridge Replacement399,000
(Base Construction Allocation - $319,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(17) Ulster Township, T-712, Bridge over Cash Creek, Bridge Replacement258,000
(Base Construction Allocation - $206,000) (Land Allocation - $13,000) (Design and Contingencies - $39,000)
(b) State Bridges
(1) S.R.3012, Tributary to Towanda Creek, Canton Township, Bridge Replacement319,000
(Base Construction Allocation - $255,000) (Land Allocation - $16,000) (Design and Contingencies - $48,000)
(2) S.R.0220, Murray Creek Bridge over Murray Creek, Athens Township, Bridge Replacement682,000
(Base Construction Allocation - $546,000) (Land Allocation - $34,000) (Design and Contingencies - $102,000)
(3) S.R.0220, Sugar Creek Bridge, 0.5 Mile North of Towanda, North Towanda Township, Bridge Rehabilitation111,000
(Base Construction Allocation - $104,000) (Design and Contingencies - $7,000)

Section 13. Bucks County.

(a) Local Bridges
(1) Hulmeville Borough, Main Street Bridge over Tributary of Neshaminy Creek, Bridge Replacement300,000
(2) Bedminster Township, T-417, Stoney Bridge Road, Bridge over Deep Run Creek, Bridge Replacement480,000
(Base Construction Allocation - $418,000) (Land Allocation - $2,000) (Design and Contingencies - $60,000)
(3) Solebury Township, T-392, Covered Bridge Road, Bridge over Pidcock Creek, Bridge Replacement515,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $65,000)
(4) Newtown Township and Newtown Borough, T-357, Barclay Street, Bridge over Newtown Creek, Bridge Replacement432,000
(Base Construction Allocation - $374,000) (Land Allocation - $3,000) (Design and Contingencies - $55,000)
(5) Plumstead Township, T-376, Gayman Road, Bridge over Neshaminy Creek, Bridge Replacement452,000
(Base Construction Allocation - $385,000) (Land Allocation - $2,000) (Design and Contingencies - $65,000)
(6) Bedminster and Tinicum Townships, T-427, Farm School Road, Bridge over Tohickon Creek, Bridge Replacement489,000
(Base Construction Allocation - $425,000) (Land Allocation - $4,000) (Design and Contingencies - $60,000)
(7) Springfield Township, T-418, Springhouse Lane, Bridge over Cooks Creek, Bridge Replacement540,000
(Base Construction Allocation - $475,000) (Design and Contingencies - $65,000)
(8) Tinicum Township, T-455, Jugtown Hill Road, Bridge over Pennsylvania Canal, Bridge Replacement558,000
(Base Construction Allocation - $490,000) (Land Allocation - $3,000) (Design and Contingencies - $65,000)
(9) Nockamixon Township, T-481, Trauger's Crossing Road, Bridge over Gallows Run Creek, Bridge Replacement381,000
(Base Construction Allocation - $329,000) (Land Allocation - $2,000) (Design and Contingencies - $50,000)
(10) Plumstead Township, T-416, Schlentz Hill Road, Bridge over Cabin Run Creek, Bridge Replacement510,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $60,000)
(11) Solebury Township, T-375, Atkinson Road, Bridge over Pidcock Creek, Bridge Replacement445,000
(Base Construction Allocation - $370,000) (Land Allocation - $5,000) (Design and Contingencies - $70,000)
(12) Bedminster Township, T-376, Bucks Road, Bridge over East Branch of Perkiomen Creek, Bridge Replacement414,000
(Base Construction Allocation - $358,000) (Land Allocation - $2,000) (Design and Contingencies - $54,000)
(13) Nockamixon Township, T-449, Quarry Road, County Bridge No.1 over Rapp Creek, Bridge Rehabilitation401,000
(14) Nockamixon Township, T-485, Ealer Hill Road, County Bridge No.223 over Gallows Run, Bridge Rehabilitation513,000
(15) Wrightstown Township, T-369, Brownsburg Road Bridge over S.R.0413, Bridge Rehabilitation175,000
(16) Tinicum Township, T-439, Clayridge Road Bridge over Rapp Creek, Bridge Rehabilitation400,000
(17) Plumstead Township, T-410, Covered Bridge Road Bridge over Cabin Run Creek, Bridge Rehabilitation348,000
(18) Wrightstown Township, T-369, Penns Park Road Bridge, Bridge Rehabilitation5,000
(19) Nockamixon Township, T-443, Strocks Grove Road Bridge over Beaver Creek, Bridge Rehabilitation350,000
(20) Nockamixon Township, Old Easton Road Bridge over Gallows Run, Bridge Rehabilitation400,000
(21) Hilltown Township, T-417, Rickert Road, Bridge over Morris Run, Bridge Replacement464,000
(Base Construction Allocation - $407,000) (Land Allocation - $2,000) (Design and Contingencies - $55,000)
(22) Hilltown Township, T-362, Schwenk Mill Road, Bridge over Morris Run, Bridge Replacement486,000
(Base Construction Allocation - $429,000) (Land Allocation - $2,000) (Design and Contingencies - $55,000)
(23) Warrington Township, T-334, Pickertown Road, Bridge over Mill Creek, Bridge Replacement485,000
(Base Construction Allocation - $415,000) (Land Allocation - $3,000) (Design and Contingencies - $67,000)
(24) East Rockhill Township, T-362, Schwenk Mill Road, Bridge over Perkiomen Creek, Bridge Replacement512,000
(Base Construction Allocation - $450,000) (Land Allocation - $2,000) (Design and Contingencies - $60,000)
(25) Hilltown Township, T-421, Quarry Road, Bridge over Morris Run Creek, Bridge Replacement424,000
(Base Construction Allocation - $365,000) (Land Allocation - $4,000) (Design and Contingencies - $55,000)
(26) New Britain Township, T-395, Upper State Road, Bridge over Neshaminy Creek, Bridge Reconstruction99,000
(Base Construction Allocation - $90,000) (Design and Contingencies - $9,000)
(27) Richland Township, T-465, SEPTA Bridge over East Pumping Station Road, Bridge Replacement950,000
(Base Construction Allocation - $820,000) (Land Allocation - $50,000) (Design and Contingencies - $80,000)
(28) Richland Township, T-347, Shelly Road, Bridge over Branch of Tohickon Creek, Bridge Replacement405,000
(Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $35,000)
(29) Richland Township, T-347, Shelly Bridge, Shelly Road access to Route 309, Bridge Replacement90,000
(Base Construction Allocation - $80,000) (Design and Contingencies - $10,000)
(b) State Bridges
(1) S.R.0032, River Road Bridge at Fleecy Dale Road over Paunacussing Creek, Solebury Township, Bridge Replacement1,100,000
(Base Construction Allocation - $1,000,000) (Design and Contingencies - $100,000)
(2) S.R.1014, Geigel Hill Bridge over Branch of Swamp Creek, Tinicum Township, Bridge Rehabilitation242,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $37,000)
(3) S.R.1016, Delaware Road Bridge over Pennsylvania Canal, Rigelsville Borough, Bridge Replacement2,133,000
(Base Construction Allocation - $1,688,000) (Land Allocation - $175,000) (Design and Contingencies - $270,000)
(4) S.R.2035, Richlieu Road Bridge over Poquessing Creek, Bensalem Township, Bridge Replacement354,000
(Base Construction Allocation - $295,000) (Land Allocation - $30,000) (Design and Contingencies - $29,000)
(5) S.R.2095, Dark Hollow Road Bridge over Neshaminy Creek, Buckingham Township, Bridge Replacement926,000
(Base Construction Allocation - $815,000) (Land Allocation - $30,000) (Design and Contingencies - $81,000)
(6) S.R.0202, Doylestown Bypass, Pa.611 to Pa.262, 8 bridges, Doylestown and Buckingham Townships, Bridge Deck Rehabilitation4,000,000
(Base Construction Allocation - $3,800,000) (Design and Contingencies - $200,000)
(7) S.R.0001, Langhorne Bypass, Pa.213 to Pa. Turnpike, 5 bridges, Bensalem and Middletown Townships, Bridge Deck Rehabilitation10,000,000
(Base Construction Allocation - $9,500,000) (Design and Contingencies - $500,000)
(8) S.R.0152, State Road Bridge over SEPTA, West Rockhill Township, Bridge Deck Rehabilitation500,000
(Base Construction Allocation - $475,000) (Design and Contingencies - $25,000)
(9) S.R.0212, Richlandtown Road Bridge over Tohickon Creek, Quakertown, Bridge Deck Rehabilitation510,000
(Base Construction Allocation - $485,000) (Design and Contingencies - $25,000)
(10) S.R.0611, Easton Road Bridge over Deep Run, Bedminster Township, Bridge Deck Rehabilitation500,000
(Base Construction Allocation - $475,000) (Design and Contingencies - $25,000)
(11) S.R.0611, Easton Road Bridge over Tohickon Creek, Bedminster Township, Bridge Deck Rehabilitation700,000
(Base Construction Allocation - $665,000) (Design and Contingencies - $35,000)
(12) S.R.0611, Easton and Creamery Roads, Tinicum Township, Bridge Deck Rehabilitation350,000
(Base Construction Allocation - $332,000) (Design and Contingencies - $18,000)
(13) S.R.2006, Newportville-Falls Road Bridge over Neshaminy Creek, Bensalem Township, Bridge Deck Rehabilitation1,400,000
(Base Construction Allocation - $1,330,000) (Design and Contingencies - $70,000)
(14) S.R.2020, Bristol/Tyburn Road Bridge over Amtrak, Falls Township, Bridge Deck Rehabilitation1,100,000
(Base Construction Allocation - $1,045,000) (Design and Contingencies - $55,000)
(15) S.R.2020, Tyburn Road at Warner Company Road, Falls Township, Bridge Deck Rehabilitation600,000
(Base Construction Allocation - $570,000) (Design and Contingencies - $30,000)
(16) S.R.2020, Tyburn Road over Conrail Spur, Falls Township, Bridge Deck Rehabilitation650,000
(Base Construction Allocation - $618,000) (Design and Contingencies - $32,000)
(17) S.R.2020, Tyburn Road at Pennsylvania Avenue, Falls Township, Bridge Deck Rehabilitation450,000
(Base Construction Allocation - $428,000) (Design and Contingencies - $22,000)
(18) S.R.0513, Hulmeville Road, Bridge over a Tributary of Poquessing Creek, Bensalem Township, Bridge Replacement400,000
(Base Construction Allocation - $315,000) (Land Allocation - $35,000) (Design and Contingencies - $50,000)
(19) Schofield Covered Bridge, Tyler State Park, Covered Bridge Trail over Neshaminy Creek, Newton Township and Northampton Township, Bridge Replacement750,000
(Base Construction Allocation - $600,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000)
(20) S.R.2002, Radcliffe Street over Adams Hollow Creek, Bristol Borough, Bridge Replacement335,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $35,000)
(21) S.R.0001, Philadelphia to Oxford Valley, Langhorne, Lower Makefield, Bensalem and Middletown Townships, Bridge Rehabilitations830,000
(Base Construction Allocation - $720,000) (Land Allocation - $20,000) (Design and Contingencies - $90,000)
(22) S.R.0611, Doylestown Bypass Bridges, Neshaminy Creek to Saw Mill Road, Doylestown Borough and Plumstead Township, Bridge Rehabilitations620,000
(Base Construction Allocation - $530,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000)
(23) S.R.2081, Worthington Mill Road Bridge over Neshaminy Creek, Wrightstown Township, Bridge Reconstruction1,220,000
(Base Construction Allocation - $1,100,000) (Design and Contingencies - $120,000)
(24) S.R.0032, River Road Bridge over Pennsylvania Canal, Solebury Township, Bridge Reconstruction400,000
(Base Construction Allocation - $360,000) (Design and Contingencies - $40,000)
(25) S.R.2069, Stony Hill Road Bridge over Brock Creek, Lower Makefield Township, Bridge Reconstruction224,000
(Base Construction Allocation - $202,000) (Design and Contingencies - $22,000)
(26) S.R.2097, Forest Grove Road Bridge over Mill Creek, Buckingham Township, Bridge Reconstruction199,000
(Base Construction Allocation - $180,000) (Design and Contingencies - $19,000)
(27) S.R.2069, Lindenhurst Road Bridge over Core Creek, North of Woodside Road, Lower Makefield Township, Bridge Reconstruction1,193,000
(Base Construction Allocation - $1,083,000) (Design and Contingencies - $110,000)
(28) S.R.0532, Buck Road Bridge over Neshaminy Creek, Newtown Township, Bridge Reconstruction2,100,000
(Base Construction Allocation - $1,880,000) (Land Allocation - $110,000) (Design and Contingencies - $110,000)
(29) S.R.0532, Washington Avenue Bridge, Newtown Township, Bridge Rehabilitation500,000
(30) S.R.2036, Swamp Road Bridge over Branch of Neshaminy Creek, Newtown Township, Bridge Rehabilitation1,000,000
(31) S.R.2089, Almshouse Lane and State Road Bridge over Neshaminy Creek, Doylestown Township, Bridge Rehabilitation400,000
(32) S.R.0113, Bedminster Road Bridge over Tohickon Creek, Bedminster and Tinicum Townships, Bridge Rehabilitation220,000
(33) S.R.1017, Bridgeton Hill Road Bridge over Unnamed Stream, Bridgeton Township, Bridge Rehabilitation455,000
(34) S.R.1019, Church Hill Road Bridge over Branch of Gallows Run, Nockamixon Township, Bridge Rehabilitation479,000
(35) S.R.4091, Kellers Church Road Bridge over Deep Run, Bedminster Township, Bridge Rehabilitation480,000
(36) S.R.0413, Pa. Railroad Bridges over S.R.0413, Middletown Township, Bridge Replacement2,600,000
(Base Construction Allocation - $2,025,000) (Land Allocation - $275,000) (Design and Contingencies - $300,000)
(37) S.R.2049, Pa. Railroad Bridges over S.R.2049, Middletown Township, Bridge Replacement2,200,000
(Base Construction Allocation - $1,780,000) (Land Allocation - $200,000) (Design and Contingencies - $220,000)
(38) S.R.2033, Pa. Railroad Bridges over S.R.2033, Middletown Township, Bridge Replacement1,400,000
(Base Construction Allocation - $995,000) (Land Allocation - $275,000) (Design and Contingencies - $130,000)
(39) S.R.0563, Ridge Road Bridge over Ridge Valley Creek, West Rockhill Township, Bridge Reconstruction188,000
(Base Construction Allocation - $170,000) (Design and Contingencies - $18,000)
(40) S.R.4101, Old Bethlehem Road Bridge over Branch of Cook's Creek, Springfield Township, Bridge Reconstruction672,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $72,000)
(41) S.R.2069, Lindenhurst Road Bridge over Core Creek, Lower Makefield Township, Bridge Reconstruction116,000
(Base Construction Allocation - $104,000) (Design and Contingencies - $12,000)
(42) S.R.2077, Mearns Road Bridge over Tributary of Little Neshaminy Creek, Warwick Township, Bridge Reconstruction298,000
(Base Construction Allocation - $270,000) (Design and Contingencies - $28,000)
(43) S.R.0332, Richboro Road Bridge over Neshaminy Creek, Newtown Township, Bridge Reconstruction2,169,000
(Base Construction Allocation - $1,919,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)
(44) S.R.2025, Bristol Road Bridge over Conrail, Northampton Township, Bridge Replacement2,785,000
(Base Construction Allocation - $2,250,000) (Land Allocation - $220,000) (Design and Contingencies - $315,000)

Section 14. Butler County.

(a) Local Bridges
(1) City of Butler, West New Castle Street Bridge over Sullivan Run, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(2) City of Butler, T-362, West Penn Street Bridge over Sullivan Run, Bridge Replacement450,000
(Base Construction Allocation - $375,000) (Land Allocation - $15,000) (Design and Contingencies - $60,000)
(3) City of Butler, T-354, Mercer Street Bridge over Sullivan Run, Bridge Replacement500,000
(Base Construction Allocation - $415,000) (Land Allocation - $25,000) (Design and Contingencies - $60,000)
(4) City of Butler, T-319, West Brady Street Bridge over Sullivan Run, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(5) Parker Township, T-731, Jones Bridge over North Branch Bear Creek, Bridge Replacement585,000
(Base Construction Allocation - $530,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(6) Adams Township, T-382, Glade Run Bridge over Glade Run, Bridge Replacement520,000
(Base Construction Allocation - $470,000) (Design and Contingencies - $15,000) (Land Allocation - $35,000)
(7) Donegal Township, T-830, Rattigan Road Bridge, Bridge Replacement190,000
(Base Construction Allocation - $190,000)
(8) Donegal Township, T-830, Buffalo Creek Bridge, Bridge Replacement270,000
(Base Construction Allocation - $270,000)
(9) Clearfield Township, T-664, McMillen Bridge over Little Buffalo Run, Bridge Replacement420,000
(Base Construction Allocation - $365,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(10) Winfield Township, T-656, Cornplanter Road Bridge, Bridge Replacement5,000
(Base Construction Allocation - $5,000)
(11) Butler Township, Saw Mill Run Bridge, Saw Mill Run Park, Bridge Replacement84,000
(Base Construction Allocation - $84,000)
(12) Adams Township, T-352, Kaufman Run Bridge over Kaufman Run, Bridge Replacement339,000
(Base Construction Allocation - $299,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(13) Penn Township, T-380, Anderson Run Bridge over Anderson Run, Bridge Replacement269,000
(Base Construction Allocation - $226,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(14) Zelienople Borough, Market Street Bridge over Glade Run, Bridge Replacement301,000
(Base Construction Allocation - $258,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(15) City of Butler, West New Castle Street Bridge over Sullivan Run, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(16) Jefferson Township, T-556, Thorn Creek Bridge over Thorn Creek, Bridge Replacement251,000
(Base Construction Allocation - $208,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(17) Jefferson Township, T-579, Thorn Creek Bridge over Thorn Creek, Bridge Replacement520,000
(Base Construction Allocation - $470,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(18) Muddy Creek Township, T-365 over I-79, Bridge Rehabilitation340,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $40,000)
(19) Connoquenessing Township, T-431, Bridge over Little Connoquenessing Creek, Bridge Replacement372,000
(Base Construction Allocation - $312,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(20) Donegal Township, T-701, Bridge over Orbison Road, Bridge Replacement257,000
(Base Construction Allocation - $214,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(21) City of Butler, South Monroe Street Bridge over Railroad, Bridge Replacement542,000
(Base Construction Allocation - $470,000) (Land Allocation - $12,000) (Design and Contingencies - $60,000)
(22) Middlesex Township, T-641, Bridge over Glade Run, Bridge Replacement263,000
(Base Construction Allocation - $220,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(b) State Bridges
(1) S.R.0528, Evans City Bridge over B&O Railroad, Forward Township, Bridge Replacement1,480,000
(Base Construction Allocation - $1,400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(2) S.R.0288 over Connoquenessing Creek, Zelienople Borough, Bridge Replacement1,380,000
(Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(3) S.R.3014, South Evans City Bridge over Wolfe Creek, Adams Township, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(4) S.R.3017 over Kaufman Run, Adams Township, Bridge Replacement580,000
(Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(5) S.R.3001, Lyndora Viaduct over Connoquenessing Creek, City of Butler, Bridge Replacement5,335,000
(Base Construction Allocation - $4,850,000) (Design and Contingencies - $485,000)
(6) Main Street Viaduct, Route No.8 over B&LE - B&O Railroads, City of Butler, Bridge Replacement23,000,000
(Base Construction Allocation - $10,800,000) Land Allocation - $700,000) (Design and Contingencies - $11,500,000)
(7) S.R.0356, Wayne Street Viaduct over Connoquenessing Creek, City of Butler, Bridge Replacement902,000
(Base Construction Allocation - $902,000)
(8) Main Street Viaduct over B&LE - B&O Railroads, City of Butler, Bridge Replacement980,000
(Base Construction Allocation - $980,000)
(9) S.R.0356, Wayne Street Viaduct over Connoquenessing Creek, City of Butler, Bridge Replacement5,150,000
(Base Construction Allocation - $4,800,000) (Land Allocation - $350,000)
(10) S.R.1011, Thorne Run Bridge over Thorne Run, Oakland Township, Bridge Replacement305,000
(Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $30,000)
(11) S.R.0108, Wolf Run Bridge over Wolf Run, Worth Township, Bridge Replacement1,100,000
(Base Construction Allocation - $1,100,000)
(12) S.R.1011, Thorne Run Bridge over Thorne Run, Oakland Township, Bridge Replacement305,000
(Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $30,000)
(13) S.R.0308, Segment 0120, Offset 0000, Bridge over Muddy Creek, Clay Township, Bridge Replacement330,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(14) S.R.1019, Segment 0260, Offset 2678, Bridge over Buffalo Creek, Millerstown Borough, Bridge Replacement480,000
(Base Construction Allocation - $350,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(15) S.R.4012, Segment 0150, Offset 1280, Bridge over Seaton Creek, Marion Township, Bridge Replacement480,000
(Base Construction Allocation - $350,000) (Land Allocation - $30,000)
(Design and Contingencies - $100,000)
(16) S.R.4014, Segment 0080, Offset 0000, Bridge over North Branch of Slippery Rock Creek, Marion Township, Bridge Replacement550,000
(Base Construction Allocation - $400,000) (Land Allocation - $40,000) (Design and Contingencies - $110,000)
(17) S.R.1029, Segment 0010, Offset 0000, Bridge over North Branch of Bear Creek, Allegheny Township, Bridge Replacement430,000
(Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(18) S.R.3014, Segment 0030, Offset 0000, Bridge over Wolf Creek, Adams Township, Bridge Replacement430,000
(Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(19) S.R.3017, Segment 0010, Offset 0972, Bridge over Kaufman Run, Adams Township, Bridge Replacement480,000
(Base Construction Allocation - $350,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(20) S.R.0108, Pa.108 Bridge over I-79, Worth Township at Exit 30, Bridge Rehabilitation500,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $50,000)
(21) S.R.0228, Bridge over I-79 Westbound, Cranberry Township, Bridge Rehabilitation340,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $40,000)
(22) S.R.0228, Bridge over I-79 Eastbound, Cranberry Township, Bridge Rehabilitation390,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $40,000)
(23) S.R.0488, Bridge over I-79, Muddy Creek Township at Exit 28, Bridge Rehabilitation290,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $40,000)
(24) S.R.0528, Morain Street Park Bridge No.3 over Lake Arthur, Franklin Township, Bridge Rehabilitation2,200,000
(Base Construction Allocation - $2,000,000) (Design and Contingencies - $200,000)
(25) S.R.3018, Rowan Road Overpass over I-79, Cranberry Township, Bridge Rehabilitation340,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $40,000)
(26) S.R.3025, Harmony North Bridge over I-79, Jackson Township, Bridge Rehabilitation400,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $50,000)
(27) S.R.3027, Harmony Junction Bridge over Connoquenessing Creek and B&O Railroad, Jackson Township, Bridge Rehabilitation3,250,000
(Base Construction Allocation - $3,000,000) (Design and Contingencies - $250,000)
(28) S.R.4007, Morain South Bridge over I-79, Muddy Creek Township, Bridge Rehabilitation290,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $40,000)
(29) S.R.4007, Bridge over U.S.422, Muddy Creek Township, Bridge Rehabilitation290,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $40,000)
(30) S.R.4007, Morain North Bridge over I-79, Worth Township, Bridge Rehabilitation510,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $60,000)
(31) S.R.4007, Bridge over I-79, Worth Township, Bridge Rehabilitation460,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $60,000)
(32) S.R.0422, Lake Arthur West Bound Bridge, Muddy Creek Township, Bridge Replacement11,210,000
(Base Construction Allocation - $11,000,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000)
(33) S.R.0422, Lake Arthur East Bound Bridge, Muddy Creek Township, Bridge Replacement11,210,000
(Base Construction Allocation - $11,000,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000)
(34) S.R.0528, Lake Arthur North Bridge, Franklin Township, Bridge Replacement13,350,000
(Base Construction Allocation - $13,000,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000)
(35) S.R.3001, Picklegate Bridge over Connoquenessing Creek, Butler Township, Bridge Replacement15,600,000
(Base Construction Allocation - $15,000,000) (Land Allocation - $200,000) (Design and Contingencies - $400,000)
(36) S.R.1006, Bridge over Bear Creek, Fairview Township, Bridge Replacement172,000
(Base Construction Allocation - $134,000) (Land Allocation - $8,000) (Design and Contingencies - $30,000)
(37) S.R.1004, Walleys Mill Bridge over Silver Creek, Parker Township, Bridge Replacement170,000
(Base Construction Allocation - $124,000) (Land Allocation - $6,000) (Design and Contingencies - $40,000)
(38) S.R.1004, Bridge over Branch of Bear Creek, Parker Township, Bridge Replacement200,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(39) S.R.1014, Bridge over Bonnie Brook, Summit Township, Bridge Replacement190,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)

Section 15. Cambria County.

(a) Local Bridges
(1) Barr Township, T-496, Dutch Run Bridge, Bridge Replacement115,000
(Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(2) East Taylor Township, T-380, Henchstone Run Bridge, Bridge Replacement115,000
(Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(3) Croyle Township, T-330, Croyle Township Bridge, Bridge Replacement300,000
(Base Construction Allocation - $300,000)
(4) Dale Borough, Annie Street Bridge, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(5) Spangler Borough, South 15th Street Bridge, Bridge Replacement100,000
(Base Construction Allocation - $100,000)
(6) Spangler Borough, South 7th Street Bridge, Bridge Replacement100,000
(Base Construction Allocation - $100,000)
(7) Carrolltown Borough, CB-1 Carrolltown Treatment Plant Access Road Bridge, Bridge Replacement939,000
(Base Construction Allocation - $939,000)
(8) Loraine Borough, Highland Drive Bridge, Bridge Replacement50,000
(Base Construction Allocation - $50,000)
(9) Portage Borough, Gellespie Avenue, Trout Run Bridge No.1, Bridge Replacement422,000
(Base Construction Allocation - $422,000)
(10) Spangler Borough, South 15th Street Bridge over Fox Run, Bridge Replacement250,000
(Base Construction Allocation - $250,000)
(11) Portage Township, Conemaugh Avenue, Trout Run Bridge No.3, Bridge Replacement394,000
(Base Construction Allocation - $394,000)
(12) Portage Borough, Sonman Avenue, Trout Run Bridge No.4, Bridge Replacement661,000
(Base Construction Allocation - $661,000)
(13) Portage Borough, Jefferson Avenue, Trout Run Bridge No.2, Bridge Replacement469,000
(Base Construction Allocation - $469,000)
(14) Susquehanna Township, T-559, Allport Bridge No.5, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(15) Barr Township, T-548, North Spangler Bridge No.4, Bridge Replacement700,000
(Base Construction Allocation - $700,000)
(16) Hastings Borough, Third Avenue Bridge No.6, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(17) Allegheny Township, T-452, Wildwood Bridge, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(18) Dean Township, T-521, Dean Bridge No.11, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(19) Clearfield Township, T-517, Chest Creek Bridge No.7, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(20) Blacklick Township, T-549, Red Mill Bridge No.1, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(21) White Township, T-561, Van Orner Bridge No.10, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(b) State Bridges
(1) S.R.0053, North Armsbury Bridge, Gallitzin Township, Bridge Replacement1,018,000
(Base Construction Allocation - $1,018,000)
(2) S.R.0053, South Van Ormer Bridge, Reade Township, Bridge Replacement570,000
(Base Construction Allocation - $570,000)
(3) S.R.0053, Brady Run Bridge, Gallitzin Township, Bridge Replacement2,635,000
(Base Construction Allocation - $2,635,000)
(4) S.R.0271, Maple Street Bridge, City of Johnstown, Bridge Replacement2,250,000
(Base Construction Allocation - $2,250,000)
(5) S.R.0164, Sonman Run Bridge, Portage Borough, Bridge Replacement550,000
(Base Construction Allocation - $550,000)
(6) S.R.0240 and S.R.0219, Junction Bridge, Susquehanna Township, Bridge Replacement1,170,000
(Base Construction Allocation - $1,170,000)
(7) S.R.0253, Houtzdale Road Bridge, Reade Township, Bridge Replacement540,000
(Base Construction Allocation - $540,000)
(8) S.R.1001, Loretta Road Bridge, Allegheny Township, Bridge Replacement620,000
(Base Construction Allocation - $620,000)
(9) S.R.2014, Bridge over North Branch of Little Conemaugh Run, Munster Township, Bridge Replacement555,000
(Base Construction Allocation - $555,000)
(10) S.R.4021, Brubakers Run Bridge, Hastings Borough, Bridge Replacement515,000
(Base Construction Allocation - $515,000)
(11) S.R.0271, Maple Street Bridge over Little Conemaugh River and Conrail, City of Johnstown, Bridge Rehabilitation2,225,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000)
(12) S.R.0053, Little Conemaugh River Bridge near S.R.2008 Intersection, Croyle Township, Bridge Rehabilitation680,000
(Base Construction Allocation - $595,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000)
(13) S.R.0053, Little Conemaugh River Bridge, 0.5 Mile North of Summerhill, Croyle Township, Bridge Rehabilitation740,000
(Base Construction Allocation - $645,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000)
(14) S.R.0056, Morrellville Bridge over Saint Clair Run, City of Johnstown, Bridge Replacement650,000
(Base Construction Allocation - $475,000) (Land Allocation - $100,000) (Design and Contingencies - $75,000)
(15) S.R.0219, T-345, Bridge over S.R.0219, Richland Township, Bridge Rehabilitation815,000
(Base Construction Allocation - $700,000) (Land Allocation - $25,000) (Design and Contingencies - $90,000)
(16) S.R.0219, T-319, Bridge over S.R.0219, Richland Township, Bridge Rehabilitation860,000
(Base Construction Allocation - $745,000) (Land Allocation - $25,000) (Design and Contingencies - $90,000)
(17) S.R.0403, Valley Pike over Cherry Run, City of Johnstown, Bridge Replacement860,000
(Base Construction Allocation - $670,000) (Land Allocation - $100,000) (Design and Contingencies - $90,000)
(18) S.R.3011, Southmont Boulevard Bridge over Cheney Run, City of Johnstown, Bridge Replacement1,371,000
(Base Construction Allocation - $1,065,000) (Land Allocation - $200,000) (Design and Contingencies - $106,000)
(19) S.R.4002, Bridge over Elk Creek, Barr Township, Bridge Replacement515,000
(Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $65,000)
(20) S.R.0422, White Mill Station Bridge, Blacklick Township, Bridge Replacement1,075,000
(Base Construction Allocation - $950,000) (Design and Contingencies - $125,000)
(21) S.R.0271, Franklin-Conemaugh Bridge over Conemaugh River and Blacklick Railroad, Franklin and Conemaugh Boroughs, Bridge Rehabilitation749,000
(Base Construction Allocation - $661,000) (Design and Contingencies - $88,000)
(22) S.R.3006, Eisenhower Boulevard Bridge over Stonycreek, Upper Yoder and Stonycreek Townships, Bridge Rehabilitation356,000
(Base Construction Allocation - $314,000) (Design and Contingencies - $42,000)

Section 16. Cameron County.

(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.0555, Hicks Run Bridge over Hicks Run, Gibson Township, Bridge Replacement1,050,000
(Base Construction Allocation - $800,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)
(2) S.R.0555, Driftwood Branch, Bridge over Sinnemahoning Creek, Driftwood Borough, Bridge Replacement2,050,000
(Base Construction Allocation - $1,750,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)

Section 17. Carbon County.

(a) Local Bridges
(1) Penn Forest Township, T-516, County Bridge No.12 over Mud Run, Bridge Replacement240,000
(Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(2) East Penn Township, T-354 over Lizard Creek County Bridge No.6, Bridge Replacement445,000
(Base Construction Allocation - $390,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(3) Penn Forest Township, T-519, County Bridge No.11 over Stoney Creek, Bridge Replacement180,000
(Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(4) Lower Towamensing Township, Princess Creek Bridge over Princess Creek, Bridge Replacement100,000
(Base Construction Allocation - $85,000) (Design and Contingencies - $15,000)
(5) East Penn Township, T-354, Kittanning Bridge No.6 over Lizard Creek, Bridge Replacement445,000
(Base Construction Allocation - $390,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(6) Parker Township, Bridge No.4 over Quakake Creek, Bridge Replacement132,000
(Base Construction Allocation - $112,000) (Design and Contingencies - $20,000)
(7) Towamensing Township, T-477, County Bridge No.16 over Pohopoco Creek, Bridge Replacement375,000
(Base Construction Allocation - $325,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(8) Penn Forest Township, T-512, County Bridge No.13 over Mud Run, Bridge Replacement220,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(9) Towansing Township, T-447, County Bridge No.16 Big Creek Bridge over Pohopoco Creek, Bridge Replacement425,000
(Base Construction Allocation - $375,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(b) State Bridges
(1) S.R.0534 over Hickory Run, Kidder Township, Bridge Replacement202,000
(Base Construction Allocation - $144,000) (Land Allocation - $29,000) (Design and Contingencies - $29,000)
(2) S.R.0534 over I-80, East Side Borough, Bridge Replacement508,000
(Base Construction Allocation - $461,000) (Design and Contingencies - $47,000)
(3) S.R.0903, Jim Thorpe Bridge over Lehigh River, Jim Thorpe Borough, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)

Section 18. Centre County.

(a) Local Bridges
(1) Port Matilda Borough, Pedestrian Bridge in Port Matilda Community Park over Pa. Route No.220, Bridge Replacement165,000
(Base Construction Allocation - $135,000) (Design and Contingencies - $30,000 (b) State Bridges
(1) S.R.2008, Penns Creek Bridge over Penns Creek, Gregg Township, Bridge Replacement1,600,000
(Base Construction Allocation - $1,250,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(2) S.R.3034, One Mile Run Bridge over One Mile Run, Rush Township, Bridge Replacement500,000
(Base Construction Allocation - $300,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(3) S.R.4004, McCormick Run Bridge over McCormick Run, Union Township, Bridge Replacement500,000
(Base Construction Allocation - $300,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(4) S.R.0970, Moshannon Creek Bridge over Moshannon Creek, Snow Shoe Township, Bridge Replacement1,600,000
(Base Construction Allocation - $1,250,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(5) S.R.3034, Bridge over Cold Stream Run, Rush Township, Bridge Replacement715,000
(Base Construction Allocation - $600,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000)
(6) S.R.0322, North Atherton Street Pedestrian Overpass, Borough of State College, Bridge Construction1,850,000
(Base Construction Allocation - $1,750,000) (Design and Contingencies - $100,000)
(7) S.R.0550, Spring Creek Bridge over Spring Creek, Benner Township, Bridge Replacement1,850,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(8) S.R.2010, Potter Run Bridge over Potter Stream, Potter Township, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(9) S.R.2018, Elk Creek Bridge No.5 over Elk Creek, Penn Township, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(10) S.R.3006, Buffalo Run Bridge over Buffalo Run, Benner Township, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(11) S.R.3011, Spring Creek Bridge over Spring Creek, College Township, Bridge Replacement825,000
(Base Construction Allocation - $600,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(12) S.R.0522, Jacks Creek Bridge over Branch of Jacks Creek, Decatur Township, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(13) S.R.0655, Saddler Run Bridge over Saddler Run, Menno Township, Bridge Replacement500,000
(Base Construction Allocation - $300,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(14) S.R.0655, Little Fishing Creek Bridge over Little Fishing Creek, Union Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(15) S.R.1002, Honey Creek Bridge No.1 over Honey Creek, Armagh Township, Bridge Replacement1,300,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(16) S.R.1002, Honey Creek Bridge No.6 over Honey Creek, Armagh Township, Bridge Replacement1,050,000
(Base Construction Allocation - $850,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(17) S.R.1002, Honey Creek Bridge No.3 over Honey Creek, Armagh Township, Bridge Replacement1,200,000
(Base Construction Allocation - $950,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)
(18) S.R.1002, Dry Creek Bridge over Dry Creek, Armagh Township, Bridge Replacement825,000
(Base Construction Allocation - $600,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(19) S.R.1002, Honey Creek Bridge No.5 over Honey Creek, Armagh Township, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(20) S.R.1003, Treaster Run Bridge over Treaster Run, Armagh Township, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(21) S.R.1005, Yeagertown Bridge over Conrail and Kishacoquillas Creek, Brown Township, Bridge Replacement3,150,000
(Base Construction Allocation - $2,700,000) (Land Allocation - $150,000) (Design and Contingencies - $300,000)
(22) S.R.0504, Bridge over Cold Stream, Philipsburg Borough, Bridge Replacement700,000
(Base Construction Allocation - $500,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(23) S.R.0970, Bridge over Moshannon Creek, Rush Township, Bridge Replacement1,240,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000)

Section 19. Chester County.

(a) Local Bridges
(1) West Goshen Township, South Bolmar Street Bridge over SEPTA, Bridge Replacement380,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $30,000)
(2) Kennett Township, Octoraro Railway Bridge over Hillendale Road at Rosedale Intersection, Bridge Replacement and Underpass Reconstruction to 2 Lanes500,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $50,000)
(3) East Goshen Township, T-482, Dutton Hill Road Bridge No. 157 over Ridley Creek, Bridge Replacement850,000
(Base Construction Allocation - $700,000) (Land Allocation -$60,000) (Design and Contingencies - $90,000)
(b) State Bridges
(1) S.R.0113, Uwchlan Avenue Bridge over U.S.30 Bypass, East Caln Township, Bridge Deck Rehabilitation400,000
(Base Construction Allocation - $380,000) (Design and Contingencies - $20,000)
(2) S.R.3069, Grove Road over Broad Run, West Whiteland Township, Bridge Replacement380,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $30,000)
(3) S.R.0001, Oxford Bypass Bridges from Maryland Line to Longwood Gardens, East and West Nottingham, Lower and Upper Oxford, Penn, London and Kennett Townships, Bridge Rehabilitations540,000
(Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000)
(4) S.R.0030, Coatesville - Downingtown Bypass, T.R.10 to West Whiteland Line, Sadsbury, Valley, Caln, East Caln, East and West Whiteland Townships, Bridge Rehabilitation660,000
(Base Construction Allocation - $560,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(5) S.R.0113, Uwchlan Avenue over U.S.30 Bypass, East Caln Township, Bridge Rehabilitation400,000
(Base Construction Allocation - $380,000) (Design and Contingencies - $20,000)
(6) S.R.0202, West Chester Bypass Bridges, 322 Business Route to Pa.100, West Goshen and Whiteland Townships, Bridge Rehabilitations930,000
(Base Construction Allocation - $820,000) (Land Allocation - $20,000) (Design and Contingencies - $90,000)
(7) S.R.0422, Pottstown Expressway and Bypass, Berks County to Pa.113 in various Townships and Montgomery County, Bridge Rehabilitations520,000
(Base Construction Allocation - $440,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(8) S.R.1009, Old Eagle School Road over U.S.202, Tredyffrin Township, Bridge Rehabilitation4,135,000
(Base Construction Allocation - $3,630,000) (Land Allocation - $200,000) (Design and Contingencies - $305,000)
(9) S.R.2005, SEPTA Underpass next to Bridge over Chester Creek, Thornbury Township, Bridge Replacement1,650,000
(Base Construction Allocation - $1,200,000) (Land Allocation - $250,000) (Design and Contingencies - $200,000)
(10) S.R.3069, Grove Road Bridge over Broad Run, West Whiteland Township, Bridge Replacement480,000
(Base Construction Allocation - $400,000) (Land Allocation -$50,000) (Design and Contingencies - $30,000)

Section 20. Clarion County.

(a) Local Bridges.
(1) Highland Township, T-577, Township Bridge No.2 over Toby Creek, Bridge Rehabilitation394,000
(Base Construction Allocation - $351,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(2) Limestone Township, T-682, Township Bridge No.30 over Piney Creek, Bridge Rehabilitation388,000
(Base Construction Allocation - $343,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(3) Red Bank Township, T-510, Township Bridge No.47 over Pine Creek, Bridge Replacement315,000
(Base Construction Allocation - $272,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(4) Elk Township, T-418, Township Bridge No.209 over Deer Creek, Bridge Replacement281,000
(Base Construction Allocation - $236,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(5) Limestone Township, T-810, Township Bridge No.1 over Branch of Piney Creek, Bridge Replacement296,000
(Base Construction Allocation - $253,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(6) Limestone Township, T-540, Township Bridge No.29 over Little Piney Creek, Bridge Replacement260,000
(Base Construction Allocation - $210,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(7) Farmington Township, T-620, Township Bridge No.216 over Walley Run, Bridge Replacement243,000
(Base Construction Allocation - $200,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(8) Beaver Township, T-423, Township Bridge No.20 over Canoe Creek, Bridge Replacement464,000
(Base Construction Allocation - $414,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(9) Limestone Township, T-539, Township Bridge No.27 over Piney Creek, Bridge Replacement320,000
(Base Construction Allocation - $277,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(10) Limestone Township, T-439, Township Bridge No.26 over Piney Creek, Bridge Replacement296,000
(Base Construction Allocation - $253,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(11) Toby Township, T-374, Township Bridge No.220 over Cherry Run, Bridge Replacement324,000
(Base Construction Allocation - $279,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(12) Madison Township, T-442, Township Bridge No.34 over Wildcat Run, Bridge Replacement283,000
(Base Construction Allocation - $240,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(13) Paint Township, T-582, Township Bridge No.206 over Little Paint Creek, Bridge Replacement243,000
(Base Construction Allocation - $200,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(14) Porter Township, T-750, Township Bridge No.50 over Leisure Run, Bridge Replacement259,000
(Base Construction Allocation - $216,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(15) Red Bank Township, T-513, Township Bridge No.207 over Pine Creek, Bridge Replacement250,000
(Base Construction Allocation - $207,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(b) State Bridges
(1) S.R.0066, Limestone Railroad Overpass over Penn Central Railroad, Limestone Township, Bridge Replacement1,110,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000)
(2) S.R.1013, Bridge over Toby Creek, Highland Township, Bridge Replacement480,000
(Base Construction Allocation - $350,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(3) S.R.4031, Bridge over Conrail Tracks, Ashland Township, Bridge Replacement900,000
(Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(4) S.R.0036, Cook Forest Bridge over Clarion River, Farmington Township, Bridge Rehabilitation1,200,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $600,000)
(5) S.R.0066, Bridge over I-80 Eastbound, Clarion Township at Exit 10, Bridge Rehabilitation530,000
(Base Construction Allocation - $480,000) (Design and Contingencies - $50,000)
(6) S.R.0066, Bridge over I-80 Westbound, Clarion Township, Bridge Rehabilitation500,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $50,000)
(7) S.R.0068, Bridge over I-80, Monroe Township, Bridge Rehabilitation660,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $60,000)
(8) S.R.0322, Bridge over I-80, Clarion Township at Exit 11, Bridge Rehabilitation450,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $50,000)
(9) S.R.0338, Monroe Overpass over I-80, Beaver Township, Bridge Rehabilitation400,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $50,000)
(10) S.R.3007, Bridge over I-80, Beaver Township at Exit 7, Bridge Rehabilitation400,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $50,000)
(11) S.R.4001, Bridge over I-80, Beaver Township, Bridge Rehabilitation370,000
(Base Construction Allocation - $320,000) (Design and Contingencies - $50,000)
(12) S.R.8006, Bridge over Pa.66 and I-80 Ramp, Paint Township at Exit 8, Bridge Rehabilitation400,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $50,000)

Section 21. Clearfield County.

(a) Local Bridges
(1) Graham Township, T-697 over Moravian Run, Bridge Replacement405,000
(Base Construction Allocation - $360,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(2) Greenwood Township, Bower Bridge over Susquehanna River, Bridge Replacement535,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(3) Pike Township, T-206, Bridge over Anderson Creek, Bridge Replacement1,016,000
(Base Construction Allocation - $861,000) (Land Allocation - $45,000) (Design and Contingencies - $110,000)
(4) Pike Township, T-433, Bridge over Little Clearfield Creek, Bridge Replacement661,000
(Base Construction Allocation - $546,000) (Land Allocation - $40,000) (Design and Contingencies - $75,000)
(b) State Bridges
(1) S.R.0322, Anderson Creek Bridge over Anderson Creek, Union Township, Bridge Replacement1,500,000
(Base Construction Allocation - $1,300,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(2) S.R.0219, South Brady Street Bridge over B&P Railroad and Pentz Run, City of DuBois, Bridge Replacement2,050,000
(Base Construction Allocation - $1,775,000) (Land Allocation - $100,000) (Design and Contingencies - $175,000)
(3) S.R.0053, Beaver Run Bridge over Beaver Run, Houtzdale Borough, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(4) S.R.0153, Beaver Run Bridge over Beaver Run, Houtzdale Borough, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(5) S.R.2007, Goss Run Bridge over Goss Run, Brisbin Borough, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(6) S.R.1050, Moose Creek Bridge over Moose Creek, Clearfield Borough, Bridge Replacement850,000
(Base Construction Allocation - $650,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(7) S.R.0255, Mine Cover-In Bridge, Village of Hollywood, Bridge Replacement1,025,000
(Base Construction Allocation - $750,000) (Land Allocation - $100,000) (Design and Contingencies - $175,000)
(8) S.R.2029, Roaring Run Bridge over Roaring Run, Bradford Township, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(9) S.R.3001, Chest Creek Bridge over Chest Creek, Mahaffey Borough, Bridge Replacement1,650,000
(Base Construction Allocation - $1,300,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(10) S.R.2024, Little Laurel Run Bridge over Little Laurel Run, Decatur Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(11) S.R.3014, Chest Creek Bridge over Chest Creek, Chest Township, Bridge Replacement950,000
(Base Construction Allocation - $750,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(12) S.R.4018, Bennetts Branch Bridge over Bennetts Creek, Huston Township, Bridge Replacement1,000,000
(Base Construction Allocation - $800,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(13) S.R.3007, Orrs Run Bridge over Orrs Run, Knox Township, Bridge Replacement550,000
(Base Construction Allocation - $350,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)

Section 22. Clinton County.

(a) Local Bridges
(1) Chapman Township, Old Route 120 at Young Womens Creek North Bend, Bridge Replacement960,000
(Base Construction Allocation - $854,000) Land Allocation - $10,000) (Design and Contingencies - $96,000)
(2) Logan Township, T-537, Bridge in Tylersville, Bridge Replacement221,000
(Base Construction Allocation - $195,000) (Land Allocation - $6,000) (Design and Contingencies - $20,000)
(3) Leidy Township, T-308, Bridge over Kettle Creek, Bridge Replacement220,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(4) Mill Hall Borough, Peale Avenue Bridge over Fishing Creek, Bridge Replacement350,000
(Base Construction Allocation - $310,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(b) State Bridges
(1) S.R.0477, Long Run Bridge over Long Run, Lamar Township, Bridge Replacement800,000
(Base Construction Allocation - $600,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(2) S.R.0477, Fishing Creek Bridge over Tributary of Fishing Creek, Greene Township, Bridge Replacement575,000
(Base Construction Allocation - $375,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(3) S.R.1016, Pine Creek Bridge over Pine Creek, Pine Creek Township, Bridge Replacement3,000,000
(Base Construction Allocation - $2,700,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(4) S.R.2009, Fishing Creek Bridge over Fishing Creek, Logan Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(5) S.R.2022, Bitner Run Bridge over Bitner Run, Beech Creek Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(6) S.R.2002, Cherry Run Bridge over Cherry Run, Porter & Logan Townships, Bridge Replacement775,000
(Base Construction Allocation - $575,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(7) S.R.2008, Long Run Bridge over Long Run, Lamar Township, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(8) S.R.2016, Fishing Creek Bridge over Fishing Creek, Mill Hall Borough, Bridge Replacement1,600,000
(Base Construction Allocation - $1,250,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)

Section 23. Columbia County.

(a) Local Bridges
(1) Beaver Township, T-367, Bridge over Catawissa Creek, Bridge Replacement1,153,000
(Base Construction Allocation - $980,000) (Land Allocation - $51,000) (Design and Contingencies - $122,000)
(2) Main Township, T-468, Columbia County Bridge No.42, Bridge over Catawissa Creek, Bridge Replacement1,357,000
(Base Construction Allocation - $1,086,000) (Land Allocation - $68,000) (Design and Contingencies - $203,000)
(3) Stillwater Borough, Columbia County Bridge No.136 over Raven Creek, Bridge Replacement305,000
(Base Construction Allocation - $252,000) (Land Allocation - $21,000) (Design and Contingencies - $32,000)
(4) Main Township, T-413, Columbia County Bridge No.44 over Catawissa Creek, Bridge Replacement990,000
(Base Construction Allocation - $825,000) (Land Allocation - $53,000) (Design and Contingencies - $112,000)
(5) Mifflin Township, T-678, Columbia County Bridge No.51 over Scotch Run, Bridge Replacement233,000
(Base Construction Allocation - $189,000) (Land Allocation - $20,000) (Design and Contingencies - $24,000)
(6) Pine Township, T-621, Columbia County Bridge No.85 over West Branch Run, Bridge Replacement564,000
(Base Construction Allocation - $287,000) (Land Allocation - $240,000) (Design and Contingencies - $37,000)
(7) Greenwood Township, T-536, Columbia County Bridge No.89 over Little Fishing Creek, Bridge Replacement411,000
(Base Construction Allocation - $343,000) (Land Allocation - $25,000) (Design and Contingencies - $43,000)
(8) Hemlock Township, T-360, Columbia County Bridge No.67 over Little Fishing Creek, Bridge Replacement620,000
(Base Construction Allocation - $525,000) (Land Allocation - $21,000) (Design and Contingencies - $74,000)
(9) Mifflin Township, T-415, Columbia County Bridge No.53 over Scotch Run, Bridge Replacement265,000
(Base Construction Allocation - $217,000) (Land Allocation - $20,000) (Design and Contingencies - $28,000)
(10) Orangeville Borough, Columbia County Bridge No.118 over Conner Race, Bridge Replacement440,000
(Base Construction Allocation - $362,000) (Land Allocation - $26,000) (Design and Contingencies - $52,000)
(11) Cleveland Township, T-317, Columbia County Bridge No.29 over Musser Run, Bridge Replacement223,000
(Base Construction Allocation - $175,000) (Land Allocation - $25,000) (Design and Contingencies - $23,000)
(12) North Centre Township, T-503, Columbia County Bridge No.169 over Bear Creek, Bridge Replacement274,000
(Base Construction Allocation - $224,000) (Land Allocation - $21,000) (Design and Contingencies - $29,000)
(13) North Centre Township, T-481, Columbia County Bridge No.168 over Bear Creek, Bridge Replacement270,000
(Base Construction Allocation - $210,000) (Land Allocation - $32,000) (Design and Contingencies - $28,000)
(14) Sugarloaf Township and Main Township, T-468, Bridge over Catawissa Creek, Bridge Replacement1,357,000
(Base Construction Allocation - $1,086,000) (Land Allocation - $68,000) (Design and Contingencies - $203,000)
(15) Scott Township, Pine Hollow Road Bridge over Unnamed Stream, Bridge Replacement225,000
(Base Construction Allocation - $180,000) (Design and Contingencies - $45,000)
(16) Sugarloaf Township, T-812, Coles Creek Bridge over Coles Creek, Bridge Replacement317,000
(Base Construction Allocation - $267,000) (Land Allocation - $27,000) (Design and Contingencies - $23,000)
(b) State Bridges
(1) S.R.4001, Segment 0010 Offset 0349 over North Shore Road, SEDA-COG, Bridge Replacement857,000
(Base Construction Allocation - $686,000) (Land Allocation - $43,000) (Design and Contingencies - $128,000)
(2) S.R.1021, Segment 0010 Offset 0499 over Little Bear Creek, Bridge Replacement505,000
(Base Construction Allocation - $380,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000)
(3) S.R.0239, Raven Creek Bridge over Raven Creek, Benton Township, Bridge Replacement425,000
(Base Construction Allocation - $340,000) (Land Allocation - $21,000) (Design and Contingencies - $64,000)
(4) S.R.0254, Bridge over Tributary of Chillisquaque Creek, Madison Township, Bridge Replacement393,000
(Base Construction Allocation - $314,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000)
(5) S.R.1025, Bridge over Tributary of Briar Creek, Briar Creek Township, Bridge Replacement542,000
(Base Construction Allocation - $434,000) (Land Allocation - $27,000) (Design and Contingencies - $81,000)
(6) S.R.1025, Bridge over Huntington Creek, Fishing Creek Township, Bridge Replacement1,328,000
(Base Construction Allocation - $1,062,000) (Land Allocation - $66,000) (Design and Contingencies - $200,000)
(7) S.R.4024, Bridge over Little Fishing Creek, Greenwood Township, Bridge Replacement1,148,000
(Base Construction Allocation - $918,000) (Land Allocation - $57,000) (Design and Contingencies - $173,000)
(8) S.R.0487, Fishing Creek Bridge over Fishing Creek, Stillwater Borough, Bridge Replacement2,160,000
(Base Construction Allocation - $1,730,000) (Land Allocation - $100,000) (Design and Contingencies - $330,000)
(9) S.R.0080, I-80, 3 Bridge Decks, Mifflin Township, Bridge Rehabilitation2,648,000
(Base Construction Allocation - $2,230,000) (Design and Contingencies - $418,000)
(10) S.R.4001, Bridge over Erie Lackawanna Railroad, Montour Township, Bridge Replacement857,000
(Base Construction Allocation - $686,000) (Land Allocation - $43,000) (Design and Contingencies - $128,000)
(11) S.R.4025, East Chillisquaque Bridge over East Branch of Chillisquaque River, Madison Township, Bridge Replacement426,000
(Base Construction Allocation - $368,000) (Land Allocation - $26,000) (Design and Contingencies - $32,000)
(12) S.R.4049, Fishing Creek Bridge over Fishing Creek, Sugarloaf Township, Bridge Replacement1,064,000
(Base Construction Allocation - $799,000) (Land Allocation - $106,000) (Design and Contingencies - $159,000)
(13) S.R.0487, Coles Creek Bridge over Coles Creek, Sugarloaf Township, Bridge Replacement320,000
(Base Construction Allocation - $290,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(14) S.R.0254, Mud Run Bridge over Mud Run, Greenwood Township, Bridge Replacement256,000
(Base Construction Allocation - $205,000) (Land Allocation - $13,000) (Design and Contingencies - $38,000)
(15) S.R.0254, Bridge over Tributary of Mud Run, Greenwood Township, Bridge Replacement222,000
(Base Construction Allocation - $178,000) (Land Allocation - $11,000) (Design and Contingencies - $33,000)
(16) S.R.4020, Lick Run Bridge over Lick Run, Orange Township, Bridge Replacement233,000
(Base Construction Allocation - $197,000) (Land Allocation - $19,000) (Design and Contingencies - $17,000)
(17) S.R.4003, Fishing Creek Bridge over Fishing Creek, Hemlock Township, Bridge Replacement1,964,000
(Base Construction Allocation - $1,564,000) (Land Allocation - $97,000) (Design and Contingencies - $303,000)
(18) S.R.4006, Bridge over S.R.0080, Hemlock Township, Bridge Rehabilitation1,500,000
(Base Construction Allocation - $1,196,000) (Land Allocation - $75,000) (Design and Contingencies - $229,000)
(19) S.R.1021, Warren Street Bridge, Berwick Borough, Bridge Replacement505,000
(Base Construction Allocation - $380,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000)

Section 24. Crawford County.

(a) Local Bridges
(1) Oil Creek Township, T-928, Duncan Road, Bridge over Pine Creek, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(2) East Fairfield Township, T-399, Griffen Road, Bridge over Little Sugar Creek, Bridge Rehabilitation55,000
(Base Construction Allocation - $50,000) (Design and Contingencies - $5,000)
(3) Woodcock Township, T-652, Leimbach Road, Bridge over Gravel Run, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(4) Wayne Township, T-421, Sugar Lake Road over Tributary of Sugar Lake, Bridge Rehabilitation58,000
(Base Construction Allocation - $50,000) (Design and Contingencies - $8,000)
(5) Athens Township, T-709 on Three Bridge Road over Muddy Creek, Bridge Replacement144,000
(Base Construction Allocation - $116,000) (Land Allocation - $14,000) (Design and Contingencies - $14,000)
(6) Athens Township, T-794 on Dewey Road over Muddy Creek, Bridge Replacement128,000
(Base Construction Allocation - $102,000) (Land Allocation - $13,000) (Design and Contingencies - $13,000)
(7) Athens Township, T-828 on Old Grade Road over East Branch of Muddy Creek, Bridge Replacement95,000
(Base Construction Allocation - $75,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000)
(8) Beaver Township, T-867 on Philadelphia Road over Stone Run, Bridge Replacement132,000
(Base Construction Allocation - $106,000) (Land Allocation - $13,000) (Design and Contingencies - $13,000)
(9) Beaver Township, T-883 on Joiner Road over West Branch of Conneaut Creek, Bridge Replacement236,000
(Base Construction Allocation - $188,000) (Land Allocation - $24,000) (Design and Contingencies - $24,000)
(10) Athens and Bloomfield Townships, T-789 on Townline Road over Federal Run, Bridge Replacement139,000
(Base Construction Allocation - $112,000) (Land Allocation - $13,000) (Design and Contingencies - $13,000)
(11) Bloomfield Township, Lakeview Drive over West Sherve Run, Bridge Replacement124,000
(Base Construction Allocation - $100,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(12) Conneaut Township, T-346 on Russell Road over Linesville Creek, Bridge Replacement132,000
(Base Construction Allocation - $106,000) (Land Allocation - $13,000) (Design and Contingencies - $13,000)
(13) Conneaut Township, T-605 over Linesville Creek, Bridge Replacement120,000
(Base Construction Allocation - $96,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(14) Conneaut Township, T-609 on Wheeler Road over Linesville Creek, Bridge Replacement126,000
(Base Construction Allocation - $100,000) (Land Allocation - $13,000) (Design and Contingencies - $13,000)
(15) Cussewago Township, T-496 on Lake Road over Cussewago Creek, Bridge Replacement165,000
(Base Construction Allocation - $131,000) (Land Allocation - $17,000) (Design and Contingencies - $17,000)
(16) Cussewago Township, T-540 on Fry Road over Wolf Run, Bridge Replacement120,000
(Base Construction Allocation - $96,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(17) Richmond Township, T-724 on Castle Run Road over Woodcock Creek, Bridge Replacement164,000
(Base Construction Allocation - $132,000) (Land Allocation - $16,000) (Design and Contingencies - $16,000)
(18) Sparta Township, T-880 on Firth Road over Britton Run, Bridge Replacement139,000
(Base Construction Allocation - $111,000) (Land Allocation - $14,000) (Design and Contingencies - $14,000)
(19) Spring Township, T-466 on East Spring Road over Carr Run, Bridge Replacement144,000
(Base Construction Allocation - $116,000) (Land Allocation - $14,000) (Design and Contingencies - $14,000)
(20) Summerhill Township, T-689 on Wing Road over Conneaut Creek, Bridge Replacement212,000
(Base Construction Allocation - $170,000) (Land Allocation - $21,000) (Design and Contingencies - $21,000)
(21) Summit Township, T-402 on Porter Road over Conneaut Creek, Bridge Replacement157,000
(Base Construction Allocation - $125,000) (Land Allocation - $16,000) (Design and Contingencies - $16,000)
(22) Troy Township, T-425 over Little Sugar Creek, Bridge Replacement100,000
(Base Construction Allocation - $80,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000)
(23) Venango Township, T-634 on Drakes Mill Road over Tarry Run, Bridge Replacement104,000
(Base Construction Allocation - $84,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000)
(24) Wayne Township, T-421 on Sugar Lake Road over Tributary of Sugar Lake, Bridge Replacement100,000
(Base Construction Allocation - $80,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000)
(25) Meadville City, North Main Street over Mill Run, Bridge Replacement394,000
(Base Construction Allocation - $316,000) (Land Allocation - $39,000) (Design and Contingencies - $39,000)
(26) Meadville City, Popular Street over Mill Run, Bridge Replacement306,000
(Base Construction Allocation - $244,000) (Land Allocation - $31,000) (Design and Contingencies - $31,000)
(27) Hydetown Borough, T-870 on Patterson Road over Tributary of Oilcreek, Bridge Replacement108,000
(Base Construction Allocation - $86,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(b) State Bridges
(1) S.R.1002, Venango/Railroad Bridge over Conrail, Cambridge Township, Bridge Replacement880,000
(Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(2) S.R.2029, Hydetown/Indian Run Bridge over Indian Run, Hydetown Borough, Bridge Replacement260,000
(Base Construction Allocation - $190,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(3) S.R.1007, Bidley Corners over Federal Run, Athens Township, Bridge Replacement320,000
(Base Construction Allocation - $272,000) (Land Allocation - $16,000) (Design and Contingencies - $32,000)
(4) S.R.1024 on Lake Road over Oil Creek, BMS 20102400100354, Bloomfield Township, Bridge Replacement340,000
(Base Construction Allocation - $289,000) (Land Allocation - $17,000) (Design and Contingencies - $34,000)
(5) S.R.4011 on Grange Road over Cussewago Creek, Cussewago Township, Bridge Replacement300,000
(Base Construction Allocation - $255,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000)
(6) S.R.1033, Teepleville over Mackey Run Richmond Township, Bridge Replacement280,000
(Base Construction Allocation - $238,000) (Land Allocation - $14,000) (Design and Contingencies - $28,000)
(7) S.R.0089 on Church Run Road over Dolly Run, Rome Township, Bridge Replacement350,000
(Base Construction Allocation - $297,000) (Land Allocation - $18,000) (Design and Contingencies - $35,000)
(8) S.R.4010 on Springboro Road over Carr Run, Spring Township, Bridge Replacement375,000
(Base Construction Allocation - $318,000) (Land Allocation - $19,000) (Design and Contingencies - $38,000)
(9) S.R.0618 over Tributary of Inlet Run, Summit Township, Bridge Replacement270,000
(Base Construction Allocation - $230,000) (Land Allocation - $13,000) (Design and Contingencies - $27,000)
(10) S.R.0006 over Conneaut Creek, Vernon Township, Bridge Replacement420,000
(Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(11) S.R.0008, Bridge over East Branch Oil Creek, Centerville Borough, Bridge Replacement1,560,000
(Base Construction Allocation - $1,400,000) (Land Allocation - $20,000) (Design and Contingencies - $140,000)
(12) S.R.0018, Bridge over Cemetery Run, Spring Township, Bridge Rehabilitation270,000
(Base Construction Allocation - $230,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(13) S.R.0027, Bridge over Oil Creek, City of Titusville, Bridge Replacement2,500,000
(Base Construction Allocation - $2,270,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000)
(14) S.R.0077, Woodcock Creek Bridge over Woodcock Creek, Richmond Township, Bridge Replacement910,000
(Base Construction Allocation - $810,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(15) S.R.0198, Bridge over Cussewago Creek, Hayfield Township, Bridge Replacement450,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(16) S.R.0198, French Creek Bridge over French Creek, Hayfield Township, Bridge Replacement1,400,000
(Base Construction Allocation - $1,260,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000)
(17) S.R.0285, Smock Run Bridge over Smock Run, Greenwood Township, Bridge Replacement460,000
(Base Construction Allocation - $400,000) (Land Allocation - $15,000) (Design and Contingencies - $45,000)
(18) S.R.0285, Wymans Run Bridge over Wymans Run, Fairfield Township, Bridge Replacement500,000
(Base Construction Allocation - $460,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(19) S.R.1001, Park Avenue Extension Bridge over Woodcock Creek, Woodcock Township and Saegertown Borough, Bridge Rehabilitation500,000
(Base Construction Allocation - $460,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(20) S.R.1006, Skeltontown Road Bridge over Conneauttee Creek, Venango and Cambridge Townships, Bridge Rehabilitation800,000
(Base Construction Allocation - $740,000) (Land Allocation - $5,000) (Design and Contingencies - $55,000)
(21) S.R.1013, Bethel Road over Thompson Run, Hydetown Borough, Bridge Replacement450,000
(Base Construction Allocation - $380,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(22) S.R.1016, Miller Station Road Bridge No.1 over Kelly Run, Rockdale Township, Bridge Replacement360,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(23) S.R.1016, Miller Station Road Bridge No.2 over Little Federal Run, Bloomfield Township, Bridge Replacement220,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(24) S.R.1022, Centerville Road Bridge over Muddy Creek, Athens Township, Bridge Replacement220,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(25) S.R.1022, Centerville Road Bridge over East Branch Oil Creek, Rome Township and Centerville Borough, Bridge Rehabilitation700,000
(Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(26) S.R.1032, Bridge over Shirley Run, Rome Township, Bridge Rehabilitation150,000
(Base Construction Allocation - $130,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(27) S.R.2012, Bridge over Mill Run, West Mead Township, Bridge Rehabilitation170,000
(Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(28) S.R.2028, Bridge over Pine Creek, Oil Creek Township, Bridge Replacement1,700,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $180,000)
(29) S.R.3005, Bridge over Tributary to Shenango River, South Shenango Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $110,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(30) S.R.3006, Atlantic Road Bridge over Crooked Creek, East Fallowfield Township, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(31) S.R.3009, Bridge over Bennett Run, North Shenango Township, Bridge Rehabilitation200,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(32) S.R.3016, Harmonsburg Road Bridge over Inlet Creek, Summit Township, Bridge Rehabilitation260,000
(Base Construction Allocation - $230,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(33) S.R.3021, Geneva Road Creek Bridge over Outlet Creek, Greenwood and Union Townships, Bridge Rehabilitation324,000
(Base Construction Allocation - $270,000) (Design and Contingencies - $54,000)
(34) S.R.1017, Jericho Road Bridge over Conneaut Creek, Venango and Cambridge Townships, Bridge Replacement550,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(35) S.R.1007, Bridge over Indian Run, Athens Township, Bridge Replacement280,000
(Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(36) S.R.1035, Bridge over Kelly Run, Rockdale Township, Bridge Replacement425,000
(Base Construction Allocation - $370,000) (Land Allocation - $25,000) (Design and Contingencies - $30,000)
(37) S.R.0006, Bridge over Conneaut Lake Outlet, Sadsbury Township, Bridge Replacement555,000
(Base Construction Allocation - $500,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000)
(38) S.R.0008, Bridge over Thompson Creek, Borough of Hydetown, Bridge Replacement950,000
(Base Construction Allocation - $800,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000)
(39) S.R.0006, Bridge over North Branch of Shenango River, Borough of Linesville, Bridge Replacement658,000
(Base Construction Allocation - $588,000) (Land Allocation - $25,000) (Design and Contingencies - $45,000)
(40) S.R.0006, Bridge over Tributary of French Creek, Borough of Venango, Bridge Replacement310,000
(Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)

Section 25. Cumberland County.

(a) Local Bridges
(1) Upper Allen Township, Gettysburg Pike Bridge, South of Lisburn Road, Bridge Replacement135,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(2) Mechanicsburg Borough, Mulberry Drive Bridge, Bridge Replacement135,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(3) Mechanicsburg Borough, Church Road at Mulberry over Trindle Springs, Bridge Replacement135,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(4) Lower Allen Township, Spangler Road Bridge over Conrail, Bridge Replacement825,000
(Base Construction Allocation - $675,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000)
(5) Southampton Township, T-307, Fogelsonger Road Bridge over Burd Run, Bridge Replacement380,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(6) Southampton Township, T-314, Witmer Road Bridge over Yellow Breeches Creek, Bridge Replacement140,000
(Base Construction Allocation - $90,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(7) Southampton Township, T-319, Gutshall Road Bridge over Yellow Breeches Creek, Bridge Replacement135,000
(Base Construction Allocation - $90,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(8) Middlesex Township, T-508, Wolf Bridge Road, Bridge over Conodoquinet Creek, Bridge Replacement1,555,000
(Base Construction Allocation - $1,330,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000)
(9) Silver Spring Township, T-596, Sample Bridge Road, Bridge over Conodoquinet Creek, Bridge Replacement1,795,000
(Base Construction Allocation - $1,530,000) (Land Allocation - $35,000) (Design and Contingencies - $230,000)
(10) Hampden Township, T-168, Orrs Bridge Road, Bridge over Conodoquinet Creek, Bridge Replacement2,220,000
(Base Construction Allocation - $1,840,000) (Land Allocation - $130,000) (Design and Contingencies - $250,000)
(11) Middlesex Township, Bernheisel Bridge Road, Bridge over Conodoquinet Creek, Bridge Rehabilitation and Pedestrian Walkway185,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(12) Lower Allen Township, T-968, Sheepford Road, Old Forge Bridge over the Yellow Breeches Creek, Bridge Replacement1,070,000
(Base Construction Allocation - $910,000) (Land Allocation - $25,000) (Design and Contingencies - $135,000)
(13) Upper Allen Township, T-612, Bishop Bridge Road, Bishop Bridge over Yellow Breeches Creek, Bridge Replacement1,235,000
(Base Construction Allocation - $1,050,000) (Land Allocation - $25,000) (Design and Contingencies - $160,000)
(14) Dickinson Township, T-464, Stuart Road over Yellow Breeches Creek, New Construction of Approaches, New Bridge Construction169,000
(Base Construction Allocation - $150,000) (Land Allocation - $9,000) (Design and Contingencies - $10,000)
(15) Dickinson Township, T-469, Alexander Spring Road, Bridge over Alexander Spring Run, Bridge Rehabilitation25,000
(Base Construction Allocation - $20,000) (Design and Contingencies - $5,000)
(16) Cooke Township, T-338, Michaux Road, Bridge over Tom's Run Creek, Bridge Rehabilitation19,000
(Base Construction Allocation - $18,000) (Design and Contingencies - $1,000)
(17) Cooke Township, T-340, Bendersville Road, Bridge over Mountain Creek, Wing Repairs, Bridge Rehabilitation19,000
(Base Construction Allocation - $18,000) (Design and Contingencies - $1,000)
(18) South Middleton Township, T-516, Bonnybrook Road, Bridge over LeTort Spring Run, Bridge Rehabilitation200,000
(Base Construction Allocation - $150,000) (Land Allocation - $30,000) (Design and Contingencies - $20,000)
(19) South Middleton Township, T-481, Spring Garden Street, Bridge over LeTort Spring Run, Bridge Rehabilitation65,000
(Base Construction Allocation - $60,000) (Design and Contingencies - $5,000)
(20) Mt. Holly Springs Borough, East Pine Street, Hump Back Bridge, Bridge Rehabilitation250,000
(Base Construction Allocation - $200,000) (Land Allocation - $40,000) (Design and Contingencies - $10,000)
(b) State Bridges
(1) S.R.4021, Bloserville Road over Conodoquinet Creek, Upper Frankford Township, Bridge Replacement821,000
(Base Construction Allocation - $732,000) (Land Allocation - $26,000) (Design and Contingencies - $63,000)
(2) S.R.0011 and 0015, 3 bridges over Harrisburg Expressway, Conrail and Gettysburg Road, Camp Hill Borough, East Pennsboro and Lower Allen Townships, Bridge Rehabilitation6,690,000
(Base Construction Allocation - $5,600,000) (Land Allocation - $250,000) (Design and Contingencies - $840,000)
(3) S.R.0074, Waggoners Gap Road Bridge over Conodoguinet Creek, North Middleton Township, Bridge Rehabilitation350,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $50,000)
(4) S.R.1025, Erford Road Bridge over S.R.1014, East Pennsboro Township, Bridge Rehabilitation250,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $50,000)

Section 26. Dauphin County.

(a) Local Bridges
(1) Halifax Township, T-563, County Bridge No.10, Ridge Road over Armstrong Creek, Bridge Replacement197,000
(Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $17,000)
(2) Jefferson Township, T-551, County Bridge No.13, Back Road over South Fork of Powells Creek, Bridge Replacement305,000
(Base Construction Allocation - $235,000) (Land Allocation - $10,0000) (Design and Contingencies - $60,000)
(3) Middle Paxton Township, T-304, County Bridge No.23, Red Hill Road over Clarks Creek, Bridge Replacement300,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(4) Middle Paxton Township, T-686, County Bridge No.22, Singer Lane over Stoney Creek, Bridge Replacement449,000
(Base Construction Allocation - $373,000) (Land Allocation - $10,000) (Design and Contingencies - $66,000)
(5) Reed Township, T-547, County Bridge No.28, Shoop Farm Bridge over Powells Creek, Bridge Replacement451,000
(Base Construction Allocation - $375,000) (Land Allocation - $10,000) (Design and Contingencies - $66,000)
(6) Wiconisco Township, T-707, Arch Street Bridge over Wiconisco Creek, Bridge Replacement339,000
(Base Construction Allocation - $294,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(7) East Hanover Township, T-001, Bridge No.1 on Jonestown Road over Tributary to Swatara Creek, Bridge Rehabilitation150,000
(Base Construction Allocation - $35,000) (Land Allocation - $5,000) (Design and Contingencies - $110,000)
(8) East Hanover Township, T-467, Bridge No.2 on Carlson Road over Manada Creek, Bridge Replacement422,000
(Base Construction Allocation - $340,000) (Land Allocation - $12,000) (Design and Contingencies - $70,000)
(9) East Hanover Township, T-471, Bridge No.3 on North Meadow Lane over Manada Creek, Bridge Replacement315,000
(Base Construction Allocation - $60,000) (Land Allocation - $10,000) (Design and Contingencies - $245,000)
(10) East Hanover Township, T-001, Bridge No.4 on Jonestown Road over Manada Creek, Bridge Rehabilitation285,000
(Base Construction Allocation - $235,000) (Land Allocation - $5,000) (Design and Contingencies - $45,000)
(11) Derry Township, T-504, Park Boulevard Bridge over Spring Creek, Bridge Replacement690,000
(Base Construction Allocation - $550,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000)
(b) State Bridges
(1) S.R.0325, Clarks Valley Road Bridge over Clarks Creek, Middle Paxton Township, Bridge Replacement1,050,000
(Base Construction Allocation - $900,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000)
(2) S.R.0039, Hershey Road over Swatara Creek, South Hanover Township, Bridge Rehabilitation476,000
(Base Construction Allocation - $406,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(3) S.R.3018, Herr Street over Paxton Creek, Harrisburg City, Bridge Replacement915,000
(Base Construction Allocation - $800,000) (Land Allocation - $25,000) (Design and Contingencies - $90,000)
(4) S.R.2026, Green Hill Road, Bridge over Tributary to Beaver Creek, West Hanover Township, Bridge Replacement60,000
(Base Construction Allocation - $54,000) (Design and Contingencies - $6,000)
(5) S.R.0300, Pa.283 Bridge over Swatara Creek and Conrail, Lower Swatara Township, Bridge Rehabilitation500,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $50,000)
(6) S.R.0322, Paxton Street Bridge No.2 over Conrail and Penhar Street, Swatara Township, Bridge Rehabilitation500,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $50,000)
(7) S.R.0322, Paxton Street Bridge No.1 over Eisenhower Boulevard, Swatara Township, Bridge Rehabilitation450,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $50,000)
(8) S.R.0441, Oberlin and Airport Connector Roads over Pa.283, Lower Swatara Township, Bridge Rehabilitation650,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $50,000)
(9) S.R.2007, Deodate Road Bridge over Pa.283, Londonderry Township, Bridge Rehabilitation300,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $50,000)
(10) S.R.3012, Market Street Bridge over Susquehanna River, City of Harrisburg, Bridge Rehabilitation1,550,000
(Base Construction Allocation - $1,500,000) (Design and Contingencies - $50,000)

Section 27. Delaware County.

(a) Local Bridges
(1) Middletown Township, Indian Lane Bridge over SEPTA Tracks, Bridge Replacement1,500,000
(Base Construction Allocation - $1,300,000) (Design and Contingencies - $200,000)
(b) State Bridges
(1) S.R.0100, Creek Road Bridge over Harvey's Run, Birmingham Township, Bridge Rehabilitation285,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $35,000)
(2) S.R.1018, Ardmore Avenue Bridge over SEPTA, Haverford Township, Bridge Replacement875,000
(Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000)
(3) S.R.0001, Township Line Road over SEPTA P&W, Upper Darby Township, Bridge Deck Rehabilitation225,000
(Base Construction Allocation - $214,000) (Design and Contingencies - $11,000)
(4) S.R.0452, Market Street Bridge over Amtrak, Lower Chichester Township, Bridge Replacement6,000,000
(Base Construction Allocation - $5,700,000) (Design and Contingencies - $300,000)
(5) S.R.0013, McDade Boulevard, Bridge over Darby Creek, Darby Borough, Bridge Replacement1,000,000
(Base Construction Allocation - $815,000) (Land Allocation - $100,000) (Design and Contingencies - $85,000)
(6) S.R.0013, MacDade Boulevard Bridge over Darby Creek, Darby Borough, Bridge Rehabilitation1,900,000
(Base Construction Allocation - $1,400,000) (Land Allocation - $200,000) (Design and Contingencies - $300,000)
(7) S.R.0100, Bridge over Brandywine Creek, Delaware and Chester County Line, Bridge Replacement2,300,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $75,000) (Design and Contingencies - $225,000)
(8) S.R.3019, Manchester Avenue Bridge over SEPTA Tracks, Nether Providence Township, Bridge Replacement1,450,000
(Base Construction Allocation - $975,000) (Land Allocation - $300,000) (Design and Contingencies - $175,000)

Section 28. Elk County.

(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.1004, Crooked Creek Bridge over Crooked Creek, Jones Township, Bridge Replacement775,000
(Base Construction Allocation - $575,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(2) S.R.0219, Rockey Run Bridge over Rockey Run, Jones Township, Bridge Replacement975,000
(Base Construction Allocation - $775,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(3) S.R.0219, Gallagher Run Bridge over Gallagher Run, Ridgway Borough, Bridge Replacement975,000
(Base Construction Allocation - $750,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(4) S.R.3002, Irwin Run Bridge over Irwin Run, Spring Creek Township, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(5) S.R.3002, Millstone Creek Bridge over Millstone Creek, Millstone Township, Bridge Replacement1,200,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)

Section 29. Erie County.

(a) Local Bridges
(1) City of Erie, West 38th Street Bridge, Bridge Replacement312,000
(Base Construction Allocation - $282,000) (Design and Contingencies - $30,000)
(2) City of Erie, West South Street Viaduct over Bay Front Parkway, Bridge Replacement4,020,000
(Base Construction Allocation - $3,600,000) (Land Allocation - $70,000) (Design and Contingencies - $350,000)
(3) North East Township, T-780, Bort Road Bridge over Conrail, Bridge Replacement695,000
(Base Construction Allocation - $604,000) (Land Allocation - $10,000) (Design and Contingencies - $81,000)
(4) Conneaut Township, T-300 over Ashtabula Creek, ID No.25-720303004036, Bridge Replacement165,000
(Base Construction Allocation - $130,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(5) Waterford Township, T-463, Covered Bridge over LeBeouf Creek, ID No.25-722004634003, Bridge Replacement450,000
(Base Construction Allocation - $380,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(6) Conneaut Township, T-360 over Conneaut Creek, ID No.25-720303604035, Bridge Replacement160,000
(Base Construction Allocation - $125,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(7) McKean Township, T-448, Skinner Road over Elk Creek, Bridge Replacement204,000
(Base Construction Allocation - $164,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(8) Summit Township, Cherry Street Bridge over I-90, Bridge Rehabilitation1,600,000
(Base Construction Allocation - $1,410,000) (Land Allocation - $40,000) (Design and Contingencies - $150,000)
(9) Harborcreek Township, Clark Road over I-90, Bridge Rehabilitation2,100,000
(Base Construction Allocation - $1,880,000) (Land Allocation - $40,000) (Design and Contingencies - $180,000)
(b) State Bridges
(1) S.R.3029 on West Road over Branch Temple Creek, Elk Creek Township, Bridge Replacement251,000
(Base Construction Allocation - $213,000) (Land Allocation - $13,000) (Design and Contingencies - $25,000)
(2) S.R.3018 on Tannery Road over Interstate 90, Girard Township, Bridge Rehabilitation1,200,000
(Base Construction Allocation - $1,020,000) (Land Allocation - $60,000) (Design and Contingencies - $120,000)
(3) S.R.0005 on East Lake Road over Four Mile Creek, Lawrence Park Township, Bridge Replacement350,000
(Base Construction Allocation - $297,000) (Land Allocation - $18,000) (Design and Contingencies - $35,000)
(4) S.R.3020 on West Road over Lamson Run, McKean Township, Bridge Rehabilitation240,000
(Base Construction Allocation - $205,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(5) S.R.4013 on Dunn Valley Road over Elk Creek, BMS 25401300800214, McKean Township, Bridge Replacement320,000
(Base Construction Allocation - $270,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(6) S.R.3008 on Crane Road over Trout Run, Washington Township, Bridge Rehabilitation270,000
(Base Construction Allocation - $229,000) (Land Allocation - $14,000) (Design and Contingencies - $27,000)
(7) S.R.3025 on Conneauttee Valley Road over Cummings Creek, Washington Township, Bridge Replacement190,000
(Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(8) S.R.0019, Peach Street Bridge over Beaver Creek, Millcreek Township, Bridge Replacement320,000
(Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(9) S.R.0090, Bort Road Bridge over I-90, North East Township, Bridge Rehabilitation2,800,000
(Base Construction Allocation - $2,500,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000)
(10) S.R.0098, Avonia Road Bridge over Elk Creek, Fairview Township, Bridge Rehabilitation1,730,000
(Base Construction Allocation - $1,550,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000)
(11) S.R.0099, Meadville Street Bridge over Conneauttee Creek, Washington Township, Bridge Replacement990,000
(Base Construction Allocation - $880,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000)
(12) S.R.0215, Kidder's Corner Road Bridge over Conneaut Creek, Conneaut and Springfield Townships, Bridge Rehabilitation800,000
(Base Construction Allocation - $730,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(13) S.R.0426, Hare Creek Road Bridge over Tributary of Hare Creek, Wayne Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(14) S.R.2003, Flat Road Bridge over Branch of French Creek, Mill Village Borough, Bridge Rehabilitation270,000
(Base Construction Allocation - $230,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(15) S.R.2006, Donation Road Bridge over LeBoeuf Creek, Waterford Borough and Waterford Township, Bridge Replacement1,700,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $40,000) (Design and Contingencies - $160,000)
(16) S.R.2008, West High Street Extension Bridge over Horton Run, Union Township, Bridge Replacement260,000
(Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(17) S.R.2018, Lovell Road Bridge over South Branch of French Creek, Concord Township, Bridge Replacement590,000
(Base Construction Allocation - $520,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(18) S.R.2022, Columbus Avenue Extension Bridge over Baskin Run, Wayne Township, Bridge Rehabilitation350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(19) S.R.3004, Carter Road Bridge over Conneaut Township, Conneaut Township, Bridge Rehabilitation500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(20) S.R.3011, Knapp Road Bridge over Conneaut Creek, Conneaut Township, Bridge Replacement760,000
(Base Construction Allocation - $680,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(21) S.R.3011, Knapp Road Bridge No.1 over Conneaut Creek, Conneaut Township, Bridge Rehabilitation380,000
(Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(22) S.R.3011, Knapp Road Bridge No.3 over Marsh Run, Conneaut Township, Bridge Rehabilitation230,000
(Base Construction Allocation - $190,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(23) S.R.3014, Franklin Center Road Bridge over Tributary of Little Elk Creek, Girard Township, Bridge Replacement260,000
(Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(24) S.R.3014, Old State Road Bridge over Little Conneaut Creek, Washington Township, Bridge Replacement380,000
(Base Construction Allocation - $320,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(25) S.R.3015, Lexington Road Bridge over I-90, Girard Township, Bridge Replacement2,900,000
(Base Construction Allocation - $2,600,000) (Land Allocation - $40,000) (Design and Contingencies - $260,000)
(26) S.R.3018, Tannery Road Bridge over I-90, Girard Borough, Bridge Rehabilitation2,200,000
(Base Construction Allocation - $1,980,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000)
(27) S.R.3022, Kinter Road Bridge over Little Conneaut Creek, Washington Township, Bridge Rehabilitation600,000
(Base Construction Allocation - $540,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(28) S.R.3025, Sharp Road Bridge over Little Conneaut Creek, Washington Township, Bridge Replacement520,000
(Base Construction Allocation - $460,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(29) S.R.4007, Dutch Road Bridge over Walnut Creek, Fairview Township, Bridge Replacement500,000
(Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(30) S.R.4010, Hershey Road Bridge over I-79, Summit Township, Bridge Rehabilitation2,800,000
(Base Construction Allocation - $2,560,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000)
(31) S.R.4011, Grubb Road Bridge over Walnut Creek, Millcreek Township, Bridge Replacement740,000
(Base Construction Allocation - $660,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)

Section 30. Fayette County.

(a) Local Bridges
(1) North Union Township, Auto Auction Bridge, Old Route 51, Bridge Removal117,000
(Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $12,000)
(2) North Union Township, Old Route 51 Bridge, North of Auto Auction, Bridge Removal117,000
(Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $12,000)
(b) State Bridges
(1) S.R.0166, Friendship Hill Bridge over Georges Creek, Springhill and Nicholson Townships, Bridge Replacement975,000
(Base Construction Allocation - $863,000) (Land Allocation - $30,000) (Design and Contingencies - $82,000)
(2) S.R.1037, Pittsburgh Street over Trump Run, City of Connellsville, Bridge Replacement650,000
(Base Construction Allocation - $575,000) (Land Allocation - $20,000) (Design and Contingencies - $55,000)
(3) S.R.1058, Roaring Run Bridge over Roaring Run, Donegal Township, Bridge Replacement580,000
(Base Construction Allocation - $490,000) (Land Allocation - $40,000) (Design and Contingencies - $50,000)
(4) S.R.2007, Stony Run Bridge over Stony Run, Wharton Township, Bridge Replacement400,000
(Base Construction Allocation - $335,000) (Land Allocation - $30,000) (Design and Contingencies - $35,000)
(5) S.R.0051, Coal Lick Run Bridge over Coal Lick Run, City of Uniontown, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(6) S.R.0166, Bridge over Middle Run, German Township, Bridge Replacement360,000
(Base Construction Allocation - $275,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000)
(7) S.R.1041, Jacobs Creek Bridge over Jacobs Creek, Lower Tyrone Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $130,000) (Design and Contingencies - $50,000)
(8) S.R.1061, Bridge over Jacobs Creek in Lower Tyrone Township, Fayette County, to East Huntingdon Township, Westmoreland County, Bridge Replacement300,000

Section 31. Forest County.

(a) Local Bridges
(1) Tionesta Township, T-316 on Hemlock Road over Hemlock Creek, Bridge Replacement110,000
(Base Construction Allocation - $88,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(b) State Bridges
(1) S.R.1003, Blue Jay Creek Bridge over Blue Jay Creek, Howe Township, Bridge Replacement340,000
(Base Construction Allocation - $280,000) (Land Allocation - $25,000) (Design and Contingencies - $35,000)
(2) S.R.4005 on Old Traffic Route 62 over Prather Creek, Hickory Township, Bridge Replacement271,000
(Base Construction Allocation - $230,000) (Land Allocation - $14,000) (Design and Contingencies - $27,000)
(3) S.R.0666, Hickory Township, Bridge over East Hickory Creek, Bridge Rehabilitation800,000
(Base Construction Allocation - $720,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(4) S.R.0666, Hickory Township, Bridge over Hickory Creek, Bridge Rehabilitation540,000
(Base Construction Allocation - $480,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(5) S.R.0666, Hickory Township, Bridge over Beaver Run, Bridge Replacement540,000
(Base Construction Allocation - $480,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(6) S.R.0666, Hickory Township, Bridge over Beaver Creek, Bridge Replacement220,000
(Base Construction Allocation - $170,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(7) S.R.0666, Kingsley Township, Bridge over Bobbs Creek, Bridge Rehabilitation200,000
(Base Construction Allocation - $150,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(8) S.R.0666, Howe Township, Bridge over Porcupine Run, Bridge Rehabilitation200,000
(Base Construction Allocation - $150,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(9) S.R.0666, Howe Township, Bridge over Minister Creek, Bridge Rehabilitation200,000
(Base Construction Allocation - $150,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(10) S.R.0666, Howe Township, Bridge over Tributary of Tionesta Creek, Bridge Replacement600,000
(Base Construction Allocation - $500,000) (Land Allocation - $60,000) (Design and Contingencies - $40,000)
(11) S.R.0666, Howe Township, Bridge over Martin Run, Bridge Rehabilitation200,000
(Base Construction Allocation - $150,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(12) S.R.0948 over Bogus Run, Howe Township, Bridge Replacement300,000
(Base Construction Allocation - $240,000) (Land Allocation - $25,000) (Design and Contingencies - $35,000)
(13) S.R.2002 over Coleman Run, Barnett Township, Bridge Rehabilitation220,000
(Base Construction Allocation - $160,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(14) S.R.2005 over Bush Creek, Jenks Township, Bridge Rehabilitation230,000
(Base Construction Allocation - $190,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)

Section 32. Franklin County.

(a) Local Bridges
(1) Washington Township, T-365, Bridge on North Welty Road over East Branch of Antietam Creek, Bridge Replacement270,000
(Base Construction Allocation - $190,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(b) State Bridges
(1) S.R.0016, Western Maryland Railroad Overpass, Antrim Township, Bridge Replacement807,000
(Base Construction Allocation - $631,000) (Land Allocation - $76,000) (Design and Contingencies - $100,000)
(2) S.R.0016, Bridge over West Branch of Little Antietam Creek, Borough of Waynesboro/Washington Township, Bridge Replacement645,000
(Base Construction Allocation - $520,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000)

Section 33. Fulton County.

(a) Local Bridges
(1) Taylor Township, T-447, Bridge No.2 over Wooden Bridge Creek, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(2) Wells Township, T-445, Bridge No.3 over Sideling Hill Creek, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(3) Bethel Township, T-301, Bridge No.2 over Tributary to Sawmill Hollow Run, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(b) State Bridges
(1) S.R.0070, Layton Road Bridge over T-335, Brush Creek Township, Bridge Rehabilitation135,000
(Base Construction Allocation - $119,000) (Design and Contingencies - $16,000)
(2) S.R.0643, Town Hill Road Bridge over I-70, Brush Creek Township, Bridge Rehabilitation382,000
(Base Construction Allocation - $337,000) (Design and Contingencies - $45,000)
(3) S.R.0522, Knobsville Bridge over Licking Creek, Dublin Township, Bridge Replacement900,000
(Base Construction Allocation - $751,000) (Land Allocation - $50,000) (Design and Contingencies - $99,000)
(4) S.R.3008, Sipes Mill Bridge over Little Tonoloway Creek, Belfast Township, Bridge Replacement545,000
(Base Construction Allocation - $430,000) (Land Allocation - $50,000) (Design and Contingencies - $65,000)

Section 34. Greene County.

(a) Local Bridges
(1) Richhill Township, T-356, Bridge No.57 over North Fork Creek, Bridge Replacement450,000
(Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(2) Springhill Township, T-345, Bridge No.68 over Fork Creek, Bridge Replacement550,000
(Base Construction Allocation - $450,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(3) Perry Township, T-385, Bridge No.7 over Shannon Run, Bridge Replacement180,000
(Base Construction Allocation - $150,000) (Land Allocation - $15,000) (Design and Contingencies - $15,000)
(4) Gilmore Township, T-379, Bridge No.53 over Blockhouse Run, Bridge Replacement180,000
(Base Construction Allocation - $150,000) (Land Allocation - $15,000) (Design and Contingencies - $15,000)
(5) Perry Township, T-357, Bridge No.8 over Shannon Run, Bridge Replacement260,000
(Base Construction Allocation - $200,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(6) Jackson Township, T-447, Bridge No.56 over Job Creek, Bridge Replacement260,000
(Base Construction Allocation - $200,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(7) Morgan Township, T-568, Bridge No.23 over Ruff Creek, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(8) Cumberland Township, T-674, Bridge No.10 over Muddy Run, Bridge Replacement425,000
(Base Construction Allocation - $325,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(9) Greene Township, T-604, Bridge No.18 over Whiteley Creek, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(10) Carmichaels Borough, Bridge No.11 Old Town Street over Muddy Run, Bridge Construction12,000
(Base Construction Allocation - $12,000)
(11) Freeport Township, T-362, Bridge No.67 over Fish Creek, Bridge Replacement450,000
(Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(12) Center Township, T-469, Bridge No.65 over Gringe Run, Bridge Replacement450,000
(Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(13) Washington Township, T-546, Bridge No.24 over Ruff Creek, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(14) Center Township, T-487, Bridge No.42 over Pursley Creek, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(15) Center Township, T-424, Bridge No.60 over South Fork of Ten Mile Creek, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(16) Washington Township, T-550, Bridge No.27 over Craynes Run, Bridge Replacement400,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(17) Wayne Township, T-371, Bridge No.38 over Hoovers Run, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(18) Center Township, T-511, Bridge No.43 over Pursley Creek, Bridge Replacement425,000
(Base Construction Allocation - $325,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(19) Center Township, T-454, Bridge No.85 over Hargus Creek, Bridge Replacement12,000
(Base Construction Allocation - $12,000)
(20) Richhill Township, T-346, Bridge No.78 over Owens Run, Bridge Replacement425,000
(Base Construction Allocation - $325,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(21) Wayne Township, T-490, Bridge No.37 over Roberts Run, Bridge Replacement140,000
(Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(22) Cumberland Township, T-674, County Bridge No.10, over Muddy Run, Bridge Replacement489,000
(Base Construction Allocation - $443,000) (Land Allocation - $5,000) (Design and Contingencies - $41,000)
(23) Richhill Township, County Bridge No.64 over Dunkard Fork of Wheeling Creek, Bridge Replacement670,000
(24) Morgan Township, County Bridge No.87 over Tributary of Ten Mile Creek, Bridge Replacement820,000
(25) Aleppo Township, County Bridge No.102 over Tributary of South Fork of Northern Wheeling Creek, Bridge Replacement390,000
(26) Jefferson and Morgan Townships, County Bridge No.22 over Ten Mile Creek, Bridge Replacement820,000
(27) Center Township, County Bridge No.42 over Woods Run, Bridge Replacement350,000
(28) Richhill Township, County Bridge No.82 over Barnes Run of South Branch of Wheeling Creek, Bridge Replacement305,000
(29) Richhill Township, County Bridge No.83 over Barnes Run, Bridge Replacement305,000
(30) Wayne Township, County Bridge No.113 over Tuscan Run, Bridge Replacement285,000
(b) State Bridges
(1) S.R.0188, County Maintenance Building, Bridge Replacement875,000
(Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000)
(2) S.R.2016 over Whiteley Creek, Monongahela Township, Bridge Replacement550,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $50,000)
(3) S.R.3001, Enslow Fork Bridge, Richhill Township, Bridge Replacement450,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $50,000)
(4) S.R.4033, Swartz Bridge, Washington Township, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $50,000)
(5) S.R.0018, Ten Mile Creek Bridge No.3, Bridge Replacement550,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $50,000)
(6) S.R.0088, Dunkard Creek Bridge, Dilliner, Bridge Replacement1,150,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(7) S.R.0188, Segment 130 Offset 1860 to Segment 130 Offset 1933, Bells Bridge, Bridge Replacement550,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $50,000)
(8) S.R.0021, Ten Mile Creek Bridge West over Ten Mile Creek, Center Township, Bridge Replacement194,000
(Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $24,000)
(9) S.R.3009, Hoover's Run Bridge over Hoover's Run, Wayne Township, Bridge Replacement375,000
(Base Construction Allocation - $320,000) (Land Allocation - $20,000) (Design and Contingencies - $35,000)
(10) S.R.3013, Bells Run Bridge over Bells Run, Wayne Township, Bridge Replacement275,000
(Base Construction Allocation - $225,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(11) S.R.3013, Bulldog Run Bridge over Little Run, Wayne Township, Bridge Replacement280,000
(Base Construction Allocation - $230,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(12) S.R.0019, Mt. Morris Bridge No.2 over Branch of Dunkard Creek, Perry Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(13) S.R.0019, Kirby Bridge over Whiteley Creek, Whiteley Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(14) S.R.0019, Mt. Morris Bridge No.1 over Branch of Dunkard Creek, Perry Township, Bridge Rehabilitation155,000
(Base Construction Allocation - $125,000) (Design and Contingencies - $30,000)
(15) S.R.0019, Bridge over Branch of Dyers Fork, Whiteley Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(16) S.R.0019, Bridge over Ruff Creek, Washington Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(17) S.R.0019, Bridge over Boyd Run, Washington Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(18) S.R.0079, Bridge over T-631, Washington Township, Bridge Rehabilitation325,000
(Base Construction Allocation - $275,000) (Design and Contingencies - $50,000)
(19) S.R.0079, Bridge over T-557, Washington Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(20) S.R.0188, Bridge over South Fork of Ten Mile Creek, Franklin Township, Bridge Rehabilitation275,000
(Base Construction Allocation - $225,000) (Design and Contingencies - $50,000)
(21) S.R.1010, Rices Landing Bridge over Pumpkin Run, Rices Landing Borough, Bridge Rehabilitation105,000
(Base Construction Allocation - $75,000) (Design and Contingencies - $30,000)
(22) S.R.2003, Equitable Bridge over Whiteley Creek, Whiteley Township, Bridge Replacement386,000
(Base Construction Allocation - $300,000) (Land Allocation - $11,000) (Design and Contingencies - $75,000)
(23) S.R.3001, Enslow Fork Bridge over Wheeling Creek, Green - Washington County Line, Richhill Township, Bridge Replacement758,000
(Base Construction Allocation - $633,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000)
(24) S.R.3006, Hero Bridge over White Creek, Gilmore Township, Bridge Rehabilitation105,000
(Base Construction Allocation - $75,000) (Design and Contingencies - $30,000)
(25) S.R.4013, Simpson Store Bridge over Enslow Fork of Wheeling Creek, Morris and East Finley Townships, Bridge Rehabilitation195,000
(Base Construction Allocation - $145,000) (Design and Contingencies - $50,000)
(26) S.R.0188, Bridge over Laurel Run, Franklin Township, Bridge Replacement400,000
(27) S.R.0188, Bridge over South Fork of Ten Mile Creek, Franklin Township, Bridge Replacement1,000,000
(28) S.R.0188, Bridge over Grimes Run, Franklin Township, Bridge Replacement500,000
(29) S.R.0188, Bridge over South Fork of Ten Mile Creek, Franklin Township, Bridge Replacement800,000
(30) S.R.0188, Bridge over South Fork of Ten Mile Creek, Franklin Township, Bridge Replacement800,000
(31) S.R.0188, Bridge over Ruffs Creek, Morgan Township, Bridge Replacement700,000
(32) S.R.0188, Bridge over Monongahela Railroad, Morgan Township, Bridge Replacement600,000
(33) S.R.0188, Bridge over Branch of Ten Mile Creek, Morgan Township, Bridge Replacement400,000
(34) S.R.0188, Bridge over Branch of Ten Mile Creek, Jefferson Township, Bridge Replacement700,000

Section 35. Huntingdon County.

(a) Local Bridges
(1) Clay Township, T-341, Watkins Bridge over Three Springs Creek, Bridge Replacement620,000
(Base Construction Allocation - $496,000) (Land Allocation - $31,000) (Design and Contingencies - $93,000)
(2) Clay Township, T-353, Bridge over North Spring Creek, Bridge Replacement380,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(3) Cromwell Township, T-359, NESL Quarry Bridge over Shade Gap Creek, Bridge Replacement360,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(4) Cromwell Township, T-359, Bridge over Shade Creek, Bridge Replacement360,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(5) Cass Township, T-391, Baptist Church Bridge over Little Trough Creek, Bridge Replacement375,000
(Base Construction Allocation - $300,000) (Land Allocation - $25,000) (Design and Contingencies - $50,000)
(6) Mill Creek Borough, Old Route 22, Bridge over Saddlers Run, Bridge Rehabilitation400,000
(Base Construction Allocation - $300,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000)
(b) State Bridges
(1) S.R.0026, South Center Union Bridge over Standing Stone Creek, Oneida Township, Bridge Rehabilitation198,000
(Base Construction Allocation - $175,000) (Design and Contingencies - $23,000)
(2) S.R.0994, Coffee Run Bridge over Coffee Run, Raystown Lake, Lincoln Township, Bridge Rehabilitation262,000
(Base Construction Allocation - $231,000) (Design and Contingencies - $31,000)
(3) S.R.0994, Main Channel Bridge, Raystown Lake, Lincoln Township, Bridge Rehabilitation262,000
(Base Construction Allocation - $231,000) (Design and Contingencies - $31,000)
(4) S.R.0994, Orbisonia Bridge over Blacklog Creek, Orbisonia Borough, Bridge Rehabilitation220,000
(Base Construction Allocation - $194,000) (Design and Contingencies - $26,000)
(5) S.R.4003, East Petersburg Bridge over Juniata River, Porter Township, Bridge Rehabilitation198,000
(Base Construction Allocation - $175,000) (Design and Contingencies - $23,000)
(6) S.R.0026, North Airport Bridge over Standing Stone Creek, Oneida Township, Bridge Replacement1,497,000
(Base Construction Allocation - $1,293,000) (Land Allocation - $75,000) (Design and Contingencies - $129,000)
(7) S.R.0994, East Three Springs Bridge over Three Springs Creek, Clay Township, Bridge Replacement718,000
(Base Construction Allocation - $591,000) (Land Allocation - $50,000) (Design and Contingencies - $77,000)
(8) S.R.2009, Nossville Bridge over Tuscarora Creek, Tell Township, Bridge Replacement580,000
(Base Construction Allocation - $462,000) (Land Allocation - $50,000) (Design and Contingencies - $68,000)
(9) S.R.4019, Union Furnace Bridge over Arch Spring Run, Morris Township, Bridge Replacement455,000
(Base Construction Allocation - $374,000) (Land Allocation - $25,000) (Design and Contingencies - $56,000)

Section 36. Indiana County.

(a) Local Bridges
(1) Green Township, T-678, Dixon Run Bridge over Dixon Run, Bridge Replacement258,000
(Base Construction Allocation - $225,000) (Land Allocation - $8,000) (Design and Contingencies - $25,000)
(2) Center Township, T-680, Coral Bridge over Two Lick Creek, Bridge Replacement600,000
(Base Construction Allocation - $480,000) (Land Allocation - $60,000) (Design and Contingencies - $60,000)
(3) Plumville Borough, T-840, Plumville Bridge over Plum Creek, Bridge Replacement300,000
(Base Construction Allocation - $240,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(4) Rayne Township, T-611, Bridge over Pine Run, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Land Allocation - $25,000) (Design and Contingencies - $25,000)
(5) Grant Township, T-851, Bridge over East Run, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Land Allocation - $25,000) (Design and Contingencies - $25,000)
(6) Blairsville Borough, Ranson Road over Conrail, Bridge Replacement550,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(7) Blacklick Township, T-460, Arch Bridge over Aultmans Run, Bridge Replacement243,000
(Base Construction Allocation - $200,000) (Land Allocation - $8,000) (Design and Contingencies - $35,000)
(8) Burrell Township, T-660, Blacklick Creek Bridge over Blacklick Creek, Bridge Replacement1,010,000
(Base Construction Allocation - $900,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000)
(9) Blacklick Township, T-460, McKee Bridge over Aultmans Run, Bridge Replacement288,000
(Base Construction Allocation - $240,000) (Land Allocation - $8,000) (Design and Contingencies - $40,000)
(10) Blacklick Township, T-660, Aultmans Run Bridge over Aultmans Run, Bridge Replacement301,000
(Base Construction Allocation - $250,000) (Land Allocation - $8,000) (Design and Contingencies - $43,000)
(11) Saltsburg Borough, High Street Bridge over Deep Ravine, Bridge Replacement600,000
(Base Construction Allocation - $545,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(12) Clymer Borough, Wilson Street Bridge over Dixon Run, Bridge Replacement305,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(13) Creekside Borough, Caneva Street McKee Bridge over McKee Run, Bridge Replacement400,000
(Base Construction Allocation - $352,000) (Land Allocation - $8,000) (Design and Contingencies - $40,000)
(14) Adams Township, T-382, Glade Run Bridge over Glade Run, Bridge Replacement520,000
(Base Construction Allocation - $470,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(15) Armstrong Township, T-414, Thomas Bridge over Crooked Creek, Bridge Replacement550,000
(Base Construction Allocation - $465,000) (Land Allocation - $20,000) (Design and Contingencies - $65,000)
(16) Center Township, T-469, Fitzgerald Road Bridge over Cherry Run, Bridge Replacement400,000
(Base Construction Allocation - $345,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(17) West Mahoning Township, T-840, Little Mahoning Creek Bridge over Little Mahoning Creek, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(18) Center Township, T-680, Power Plant Road, Bridge Replacement500,000
(Base Construction Allocation - $445,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(b) State Bridges
(1) S.R.3031, Aultmans Run Bridge over Aultmans Run, Blacklick Township, Bridge Replacement265,000
(Base Construction Allocation - $220,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000)
(2) S.R.0022, Blairsville East, Burrell Township, Bridge Replacement8,910,000
(Base Construction Allocation - $8,710,000) (Design and Contingencies - $200,000)
(3) S.R.0108, Wolfe Run Bridge over Wolfe Run, Worth Township, Bridge Replacement131,000
(Base Construction Allocation - $100,000) (Land Allocation - $30,000) (Design and Contingencies - $1,000)
(4) S.R.0022, Blairsville East, Burrell Township Bridge Replacement200,000
(Design and Contingencies - $200,000)
(5) S.R.0259, Bolivar Bridge over Conemaugh River, Parkinson and Bolivar Boroughs, Bridge Replacement550,000
(Design and Contingencies - $550,000)
(6) S.R.3029, Whiskey Run Bridge over Whiskey Run, Young Township, Bridge Replacement503,000
(Base Construction Allocation - $458,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(7) S.R.0119, Bridge over Railroad Tracks, Rayne Township, Bridge Replacement900,000
(Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(8) S.R.3001, Bridge over Blacklegs Creek, Conemaugh Township, Bridge Replacement900,000
(Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(9) S.R.0022, U.S.22 Bridge over Pa.56 at Armagh Interchange, East Wheatfield Township, Bridge Replacement1,850,000
(Base Construction Allocation - $1,600,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(10) S.R.0056, Pa.56 Bridge over Conemaugh River, East Wheatfield Township, Bridge Painting and Rehabilitation1,100,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(11) S.R.0022, Armagh Bridge over Pa.56, East Wheatfield Township, Bridge Rehabilitation1,650,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000)
(12) S.R.0217, Blacklick Creek Bridge over Blacklick Creek, Blacklick and Burrell Townships, Bridge Rehabilitation600,000
(Base Construction Allocation - $550,000) (Design and Contingencies - $50,000)
(13) S.R.0259, Bolivar Bridge over Conemaugh River, Robinson Township and Bolivar Borough, Bridge Replacement8,673,000
(Base Construction Allocation - $7,700,000) (Land Allocation - $350,000) (Design and Contingencies - $623,000)
(14) S.R.3007, Blacklegs Creek Bridge over Blacklegs Creek, Conemaugh Township, Bridge Replacement900,000
(Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)

Section 37. Jefferson County.

(a) Local Bridges
(1) Barnett Township, T-365, Cathers Run Bridge over Cathers Run, Bridge Replacement435,000
(Base Construction Allocation - $380,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(2) Eldred Township, T-342, Mill Creek Bridge over Mill Creek, Bridge Replacement360,000
(Base Construction Allocation - $312,000) (Land Allocation - $8,000) (Design and Contingencies - $40,000)
(3) Rose Township, T-567, Coder Run Bridge over Coder Run, Bridge Replacement405,000
(Base Construction Allocation - $347,000) (Land Allocation - $8,000) (Design and Contingencies - $50,000)
(4) Henderson Township, T-622, Bridge over Laurel Run, Bridge Replacement410,000
(Base Construction Allocation - $364,000) (Land Allocation - $5,000) (Design and Contingencies - $41,000)
(5) Eldred & Union Townships, T-342, Bridge over Mill Creek, Bridge Replacement312,000
(Base Construction Allocation - $276,000) (Land Allocation - $5,000) (Design and Contingencies - $31,000)
(6) Oliver Township, T-718, Bridge over Little Sandy Creek, Bridge Replacement390,000
(Base Construction Allocation - $346,000) (Land Allocation - $5,000) (Design and Contingencies - $39,000)
(7) Beaver Township, T-337, Bridge over Red Bank Creek, Bridge Replacement165,000
(Base Construction Allocation - $140,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000)
(8) Reynoldsville Borough, Worth Street Bridge over Soldier Run, Bridge Replacement160,000
(Base Construction Allocation - $139,000) (Land Allocation - $5,000) (Design and Contingencies - $16,000)
(9) Punxsutawney Borough, South Penn Street Bridge over Mahoning Creek, Bridge Replacement260,000
(Base Construction Allocation - $229,000) (Land Allocation - $5,000) (Design and Contingencies - $26,000)
(10) Ringold Township, T-369, Bridge over Pine Run, Bridge Replacement95,000
(Base Construction Allocation - $83,000) (Land Allocation - $2,000) (Design and Contingencies - $10,000)
(11) Oliver Township, T-408, Bridge over Little Sandy Creek, Bridge Replacement120,000
(Base Construction Allocation - $105,000) (Land Allocation - $3,000) (Design and Contingencies - $12,000)
(12) Reynoldsville Borough, 5th Street Bridge over Little Sandy Creek, Bridge Replacement785,000
(Base Construction Allocation - $695,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000)
(13) Sykesville Borough, South Park Street Bridge over Stump Creek, Bridge Replacement570,000
(Base Construction Allocation - $505,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000)
(14) Knox Township, T-830, Bridge over Swamp Run, Bridge Replacement265,000
(Base Construction Allocation - $234,000) (Land Allocation - $5,000) (Design and Contingencies - $26,000)
(15) Sykesville Borough, Station Street Bridge over Stump Creek, Bridge Replacement490,000
(Base Construction Allocation - $436,000) (Land Allocation - $5,000) (Design and Contingencies - $49,000)
(16) Brockway Borough, Pedestrian Bridge (old railroad bridge) over Little Toby Creek, Bridge Replacement180,000
(Base Construction Allocation - $155,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000)
(17) Pine Creek Township, T-464, Bridge over Little Mill Creek, Bridge Replacement355,000
(Base Construction Allocation - $315,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(18) Winslow Township, T-542, Bridge over Sandy Lick Creek, Bridge Replacement865,000
(Base Construction Allocation - $770,000) (Land Allocation - $5,000) (Design and Contingencies - $90,000)
(19) Henderson Township, T-519, Bridge over Big Run Creek, Bridge Replacement390,000
(Base Construction Allocation - $345,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(20) Oliver Township, T-380, Bridge over Hadden Run, Bridge Replacement355,000
(Base Construction Allocation - $314,000) (Land Allocation - $5,000) (Design and Contingencies - $36,000)
(21) Pine Creek Township, T-452, Bridge over Little Mill Creek, Bridge Replacement275,000
(Base Construction Allocation - $245,000) (Land Allocation - $2,000) (Design and Contingencies - $28,000)
(22) Barnett Township, T-346, Bridge No.1 over Cathers Run, Bridge Replacement290,000
(Base Construction Allocation - $259,000) (Land Allocation - $2,000) (Design and Contingencies - $29,000)
(23) Barnett Township, T-346, Bridge No.2 over Cathers Run, Bridge Replacement350,000
(Base Construction Allocation - $313,000) (Land Allocation - $2,000) (Design and Contingencies - $35,000)
(24) Elder Township, T-353, Bridge No.2 over Mill Run, Bridge Replacement235,000
(Base Construction Allocation - $209,000) (Land Allocation - $2,000) (Design and Contingencies - $24,000)
(25) Elder Township, T-353, Bridge No.1 over Mill Run, Bridge Replacement225,000
(Base Construction Allocation - $201,000) (Land Allocation - $2,000) (Design and Contingencies - $22,000)
(26) Rose Township, T-396, Bridge over Coder Run, Bridge Replacement235,000
(Base Construction Allocation - $209,000) (Land Allocation - $2,000) (Design and Contingencies - $24,000)
(27) Warsaw Township, T-472, Bridge over North Fork Creek, Bridge Replacement390,000
(Base Construction Allocation - $349,000) (Land Allocation - $2,000) (Design and Contingencies - $39,000)
(28) Reynoldsville Borough, 14th Street Bridge over Soldier Run, Bridge Replacement275,000
(Base Construction Allocation - $245,000) (Land Allocation - $2,000) (Design and Contingencies - $28,000)
(b) State Bridges
(1) S.R.3033, Five Mile Run Bridge over Five Mile Run, Knox Township, Bridge Replacement420,000
(Base Construction Allocation - $370,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(2) S.R.3033, Sandy Lick Creek Bridge over Sandy Lick Creek, Brookville Borough, Bridge Replacement1,000,000
(Base Construction Allocation - $800,000) (Land Allocation - $75,000) (Design and Contingencies - $125,000)
(3) S.R.0830 over I-80 Westbound, Washington Township at Exit 15, Bridge Rehabilitation340,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $90,000)
(4) S.R.0830, Bridge over I-80 Eastbound, Washington Township at Exit 15, Bridge Rehabilitation290,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $40,000)
(5) S.R.1009, Bridge over I-80, Washington Township, Bridge Rehabilitation350,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $50,000)
(6) S.R.4001, Bridge over I-80, Union Township, Bridge Rehabilitation320,000
(Base Construction Allocation - $280,000) (Design and Contingencies - $40,000)
(7) S.R.4005, Bridge over I-80, Brookville Borough, Bridge Rehabilitation290,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $40,000)
(8) S.R.0119, Bridge over Mahoning Creek, Punxsutawney Borough, Bridge Replacement2,400,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $350,000)
(9) S.R.3003, Bridge over Little Sandy Creek, Ringgold and Beaver Townships, Bridge Replacement1,150,000
(Base Construction Allocation - $900,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(10) S.R.3005, Bridge over Little Sandy Creek, Beaver and Ringgold Townships, Bridge Replacement1,150,000
(Base Construction Allocation - $900,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(11) S.R.3013, Bridge over Mahoning Creek, Perry Township, Bridge Replacement2,230,000
(Base Construction Allocation - $1,800,000) (Land Allocation - $80,000) (Design and Contingencies - $350,000)
(12) S.R.3033, Bridge over Five Mile Run, Rose and Knox Townships, Bridge Replacement900,000
(Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(13) S.R.4005, Bridge over Pekin Run, Warsaw Township, Bridge Replacement670,000
(Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $120,000)
(14) S.R.0219, Bridge over Big Run Creek, Big Run Borough, Bridge Replacement1,000,000
(Base Construction Allocation - $800,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(15) S.R.0219, Bridge over Toby Creek, Brockway Borough, Bridge Rehabilitation955,000
(Base Construction Allocation - $750,000) (Land Allocation - $30,000) (Design and Contingencies - $175,000)
(16) S.R.0310, Bradford Street Bridge over railroad, Reynoldsville Borough, Bridge Rehabilitation1,000,000
(Base Construction Allocation - $800,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)

Section 38. Juniata County.

(a) Local Bridges
(1) Delaware Township, T-405, Delaware Creek Bridge, Bridge Replacement335,000
(Base Construction Allocation - $290,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000)
(b) State Bridges
(1) S.R.0035, Bridge over Conrail, Mifflin Borough, Bridge Replacement1,600,000
(Base Construction Allocation - $1,300,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(2) S.R.0035, Bridge over Cocolamus Creek, Monroe Township, Bridge Replacement1,300,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(3) S.R.0035, Bridge over Cocolamus Creek, Fayette Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(4) S.R.0075, Bridge over Hunter's Creek, Turbett Township, Bridge Replacement4,200,000
(Base Construction Allocation - $3,500,000) (Land Allocation - $300,000) (Design and Contingencies - $400,000)
(5) S.R.0075, Bridge over Tuscarora Creek, Turbett Township, Bridge Replacement2,550,000
(Base Construction Allocation - $2,200,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(6) S.R.0075, Bridge over Conrail, Walker Township, Bridge Replacement3,000,000
(Base Construction Allocation - $2,500,000) (Land Allocation - $200,000) (Design and Contingencies - $300,000)
(7) S.R.0235, Bridge over Stoney Run, Greenwood Township, Bridge Replacement850,000
(Base Construction Allocation - $650,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(8) S.R.0333, Bridge over Tributary of Juniata River, Turbett Township, Bridge Replacement500,000
(Base Construction Allocation - $300,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(9) S.R.1001, Bridge over Lost Run, Fermanagh Township, Bridge Replacement800,000
(Base Construction Allocation - $600,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(10) S.R.1006, Bridge over Horning Run, Fermanagh Township, Bridge Replacement725,000
(Base Construction Allocation - $500,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(11) S.R.1006, Bridge No.2 over Horning Run, Fermanagh Township, Bridge Replacement725,000
(Base Construction Allocation - $500,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(12) S.R.2010, Bridge over Cocolamus Creek, Delaware Township, Bridge Replacement900,000
(Base Construction Allocation - $675,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(13) S.R.2019, Bridge over Cranes Run, Greenwood Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(14) S.R.3031, Connector Bridge Access to S.R.0075, Port Royal Borough, Bridge Replacement1,125,000
(Base Construction Allocation - $750,000) (Land Allocation - $200,000) (Design and Contingencies - $175,000)
(15) S.R.0035, East Juniata High School Bridge over Cocolamus Creek, Fayette Township, Bridge Replacement440,000
(Base Construction Allocation - $370,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)

Section 39. Lackawanna County.

(a) Local Bridges
(1) Mayfield Borough, Chestnut Street Bridge over Lackawanna River PI No.043591229, Bridge Replacement1,360,000
(Base Construction Allocation - $1,200,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000)
(2) Archbald Borough, Wayne Street Bridge over Lackawanna River PI No.043591230, Bridge Replacement1,520,000
(Base Construction Allocation - $1,350,000) (Land Allocation - $10,000) (Design and Contingencies - $160,000)
(3) City of Scranton, Ash Street Bridge over Roaring Brook, Bridge Replacement900,000
(Base Construction Allocation - $800,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000)
(4) City of Scranton, Pocono N.E.R.R. Culvert over Meadow Brook, Bridge Replacement180,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(5) City of Scranton, North of Olive Street, Pocono N.E.R.R. Bridge over Lackawanna River, Bridge Replacement2,300,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000)
(6) City of Scranton, D&H Railroad Bridge over Olive Street, Bridge Replacement340,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(7) Taylor Borough, Erie Lackawanna Railroad Bridge over Oak Street, Bridge Replacement460,000
(Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(8) City of Scranton, South of Race Street, Lackawanna County Railroad Authority Railroad Bridge over Lackawanna River, Bridge Replacement890,000
(Base Construction Allocation - $800,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000)
(9) City of Scranton, Lackawanna County Railroad Authority Railroad Bridge over East Market Street, Bridge Replacement2,210,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000)
(10) City of Scranton, Lackawanna County Railroad Authority Railroad Bridge over Green Ridge Street, Bridge Replacement2,870,000
(Base Construction Allocation - $2,600,000) (Land Allocation - $10,000) (Design and Contingencies - $260,000)
(11) Olyphant Borough, Lackawanna County Railroad Authority Railroad Bridge over Lackawanna River, South of South Valley Avenue, Bridge Replacement1,110,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000)
(12) Jermyn Borough, Lackawanna County Railroad Authority Railroad Bridge over Delaware Street, Bridge Replacement1,110,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000)
(13) City of Scranton, Lackawanna County Railroad Authority Railroad Spur over Meadow Brook, Bridge Replacement71,000
(Base Construction Allocation - $60,000) (Land Allocation - $5,000) (Design and Contingencies - $6,000)
(14) La Plume Township, Bridge No.36 over Overbrook Road, Bridge Replacement520,000
(Base Construction Allocation - $450,000) (Land Allocation - $25,000) (Design and Contingencies - $45,000)
(b) State Bridges
(1) S.R.0106 over Fall Brook PI No.043591226, Fell Township, Bridge Replacement880,000
(Base Construction Allocation - $775,000) (Land Allocation - $10,000) (Design and Contingencies - $95,000)
(2) S.R.0106 over Tunkhannock Creek PI No.043591227, Greenfield Township, Bridge Replacement685,000
(Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000)
(3) S.R.0435 over Conrail PI No.043591225, Elmhurst Township, Bridge Replacement4,520,000
(Base Construction Allocation - $4,000,000) (Land Allocation - $20,000) (Design and Contingencies - $500,000)
(4) S.R.2016 over Ponds Creek, Lehigh Township, Bridge Replacement486,000
(Base Construction Allocation - $425,000) (Land Allocation - $10,000) (Design and Contingencies - $51,000)
(5) S.R.0435 over S.R.0348 PI No.043591228, Roaring Brook Township, Bridge Replacement750,000
(Base Construction Allocation - $660,000) (Land Allocation - $ 10,000) (Design and Contingencies - $80,000)
(6) S.R.0006 over Branch Leggetts Creek PI No.04359122, South Abington Township, Bridge Replacement1,000,000
(Base Construction Allocation - $884,000) (Land Allocation - $10,000) (Design and Contingencies - $106,000)
(7) S.R.2016 over Stegmeir's Pond, Lehigh Township, Bridge Replacement221,000
(Base Construction Allocation - $188,000) (Land Allocation - $10,000) (Design and Contingencies - $23,000)
(8) S.R.4019 over Branch Leggetts Creek PI No.04359128, Abington Township, Bridge Replacement405,000
(Base Construction Allocation - $353,000) (Land Allocation - $10,000) (Design and Contingencies - $42,000)
(9) S.R.0407 over Ackerley Creek PI No.043591207, Abington Township, Bridge Replacement653,000
(Base Construction Allocation - $574,000) (Land Allocation - $10,000) (Design and Contingencies - $69,000)
(10) S.R.1017 over Chapman Lake Stream PI No.043591209, Scott Township, Bridge Replacement558,000
(Base Construction Allocation - $489,000) (Land Allocation - $10,000) (Design and Contingencies - $59,000)
(11) S.R.1029 over Hulls Creek PI No.043591210, Scott Township, Bridge Replacement518,000
(Base Construction Allocation - $453,000) (Land Allocation - $10,000) (Design and Contingencies - $55,000)
(12) S.R.2004 over Kellum Creek PI No.04359121, Madison Township, Bridge Replacement335,000
(Base Construction Allocation - $290,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(13) S.R.0006 over Branch of Leggetts Creek PI No.043591221, South Abington Township, Bridge Replacement778,000
(Base Construction Allocation - $686,000) (Land Allocation - $10,000) (Design and Contingencies - $82,000)
(14) S.R.3005 over Gardners Creek PI No.043591215, Ransom Township, Bridge Replacement683,000
(Base Construction Allocation - $601,000) (Land Allocation - $10,000) (Design and Contingencies - $72,000)
(15) S.R.2016 over Ponds Creek PI No.043591214, Lehigh Township, Bridge Replacement486,000
(Base Construction Allocation - $425,000) (Land Allocation - $10,000) (Design and Contingencies - $51,000)
(16) S.R.4032 over Summit Lake Creek PI No.043591219, South Abington Township, Bridge Replacement425,000
(Base Construction Allocation - $370,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(17) S.R.4032 over Leggetts Creek PI No.043591220, South Abington Township, Bridge Replacement615,000
(Base Construction Allocation - $540,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000)
(18) S.R.0006 over S.R.0347 PI No.043591223, Blakely Borough, Bridge Replacement1,564,000
(Base Construction Allocation - $1,384,000) (Land Allocation - $20,000) (Design and Contingencies - $160,000)
(19) S.R.0006 over S.R.0107 PI No.043591223, Mayfield Borough, Bridge Replacement2,054,000
(Base Construction Allocation - $1,825,000) (Land Allocation - $10,000) (Design and Contingencies - $219,000)
(20) S.R.0690 over Van Brunt Creek PI No.043591208, Moscow Borough, Bridge Replacement480,000
(Base Construction Allocation - $420,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(21) S.R.0006 over Branch of Leggetts Creek PI No.043591206, Clarks Summit Borough, Bridge Replacement980,000
(Base Construction Allocation - $866,000) (Land Allocation - $10,000) (Design and Contingencies - $104,000)
(22) S.R.3013 over Lackawanna River PI No.043583205, Old Forge Borough, Bridge Replacement2,175,000
(Base Construction Allocation - $1,932,000) (Land Allocation - $10,000) (Design and Contingencies - $233,000)
(23) S.R.0247 over Lackawanna River PI No.043591203, Jessup Borough, Bridge Replacement740,000
(Base Construction Allocation - $650,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000)
(24) S.R.3017 over Lackawanna River PI No.043591216, Old Forge Borough, Bridge Replacement2,193,000
(Base Construction Allocation - $1,949,000) (Land Allocation - $10,000) (Design and Contingencies - $234,000)
(25) S.R.3019 over Branch of Lackawanna River PI No.043591217, Old Forge Borough, Bridge Replacement537,000
(Base Construction Allocation - $470,000) (Land Allocation - $10,000) (Design and Contingencies - $57,000)
(26) S.R.3027 over Leggetts Creek PI No.043589263, City of Scranton, Bridge Replacement906,000
(Base Construction Allocation - $800,000) (Land Allocation - $10,000) (Design and Contingencies - $96,000)
(27) S.R.1033 over Fall Brook PI No.043591211, City of Carbondale, Bridge Replacement702,000
(Base Construction Allocation - $618,000) (Land Allocation - $10,000) (Design and Contingencies - $74,000)
(28) S.R.0006 over South Branch of Tunkhannock Creek PI No.043591205, La Plume Township, Bridge Replacement1,596,000
(Base Construction Allocation - $1,416,000) (Land Allocation - $10,000) (Design and Contingencies - $170,000)
(29) S.R.0081, Bridge over Lackawanna River, City of Scranton, Bridge Rehabilitation2,200,000
(Base Construction Allocation - $2,000,000) (Design and Contingencies - $200,000)
(30) S.R.3015, Bridge over Lackawanna River, Moosic Borough and Old Forge Borough, Bridge Replacement1,240,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000)
(31) S.R.0006, Bridge over Pa.347, Blakely Borough, Bridge Replacement1,570,000
(Base Construction Allocation - $1,384,000) (Land Allocation - $20,000) (Design and Contingencies - $166,000)
(32) S.R.0006, Bridge over Tunkhannock Creek, La Plume Township, Bridge Rehabilitation119,000
(Base Construction Allocation - $104,000) (Design and Contingencies - $15,000)
(33) S.R.0081, 31 Bridges from Moosic to Greenfield, Bridge Rehabilitation8,187,000
(Base Construction Allocation - $7,121,000) (Design and Contingencies - $1,066,000)
(34) S.R.0084, 12 Bridges from Dunmore Borough, Jefferson Township and Roaring Brook Township, Bridge Rehabilitation3,343,000
(Base Construction Allocation - $2,908,000) (Design and Contingencies - $435,000)
(35) S.R.0107, Bridge over Branch of Tunkhannock Creek, Scott Township, Bridge Rehabilitation106,000
(Base Construction Allocation - $92,000) (Design and Contingencies - $14,000)
(36) S.R.0171, Bridge over Lackawanna River and D & H Railroad, Fell Township, Bridge Rehabilitation291,000
(Base Construction Allocation - $253,000) (Design and Contingencies - $38,000)
(37) S.R.0247, Bridge over I-84, Jefferson Township, Bridge Rehabilitation143,000
(Base Construction Allocation - $124,000) (Design and Contingencies - $19,000)
(38) S.R.0307, Bridge over I-380, Covington Township, Bridge Rehabilitation427,000
(Base Construction Allocation - $371,000) (Design and Contingencies - $56,000)
(39) S.R.0307, Bridge over I-81, City of Scranton, Bridge Rehabilitation179,000
(Base Construction Allocation - $156,000 (Design and Contingencies - $23,000)
(40) S.R.0307, Bridge over I-81 Ramp B, City of Scranton, Bridge Rehabilitation136,000
(Base Construction Allocation - $118,000) (Design and Contingencies - $18,000)
(41) S.R.0347, Bridge over I-81, Dunmore Borough, Bridge Rehabilitation205,000
(Base Construction Allocation - $178,000) (Design and Contingencies - $27,000)
(42) S.R.0380, 6 Bridges from Clifton to Roaring Brook, Roaring Brook Township, Clifton Township and Covington Township, Bridge Rehabilitations1,841,000
(Base Construction Allocation - $1,600,000) (Design and Contingencies - $241,000)
(43) S.R.0407, Bridge over Lackawanna Lake, Benton Township, Bridge Rehabilitation369,000
(Base Construction Allocation - $321,000 (Design and Contingencies - $48,000)
(44) S.R.0435, Bridge over Conrail Tracks, Elmhurst Township, Bridge Rehabilitation135,000
(Base Construction Allocation - $117,000) (Design and Contingencies - $18,000)
(45) S.R.0435, Bridge over Pa.348, Roaring Brook Township, Bridge Rehabilitation138,000
(Base Construction Allocation - $120,000) (Design and Contingencies - $18,000)
(46) S.R.0438, Bridge over Branch of Tunkhannock Creek, Scott Township, Bridge Rehabilitation138,000
(Base Construction Allocation - $120,000) (Design and Contingencies - $18,000)
(47) S.R.0502, Bridge over Spring Brook Creek, Moosic Borough, Bridge Rehabilitation112,000
(Base Construction Allocation - $97,000) (Design and Contingencies - $15,000)
(48) S.R.0502, Bridge over I-380, Covington Township, Bridge Rehabilitation154,000
(Base Construction Allocation - $134,000) (Design and Contingencies - $20,000)
(49) S.R.0590, Bridge over I-84, Jefferson Township, Bridge Rehabilitation175,000
(Base Construction Allocation - $152,000) (Design and Contingencies - $23,000)
(50) S.R.0690, Bridge over I-84, Madison Township, Bridge Rehabilitation112,000
(Base Construction Allocation - $97,000) (Design and Contingencies - $15,000)
(51) S.R.2018 over I-380, Covington Township, Bridge Rehabilitation171,000
(Base Construction Allocation - $149,000) (Design and Contingencies - $22,000)
(52) S.R.3016, Bridge over I-81, City of Scranton, Bridge Rehabilitation131,000
(Base Construction Allocation - $114,000) (Design and Contingencies - $17,000)
(53) S.R.3025, Bridge over Roaring Brook and Service Roads, City of Scranton, Bridge Rehabilitation270,000
(Base Construction Allocation - $235,000) (Design and Contingencies - $35,000)
(54) S.R.3027, Ramp Bridge over Ramp D and Providence Road, City of Scranton, Bridge Rehabilitation290,000
(Base Construction Allocation - $252,000) (Design and Contingencies - $38,000)
(55) S.R.4019, Bridge over I-81, South Abington Township, Bridge Rehabilitation166,000
(Base Construction Allocation - $144,000) (Design and Contingencies - $22,000)
(56) S.R.4023, Bridge over I-81, South Abington Township, Bridge Rehabilitation117,000
(Base Construction Allocation - $102,000) (Design and Contingencies - $15,000)
(57) S.R.8001 and U.S.11 Bridge, Moosic Interchange Ramp, Moosic Borough, Bridge Rehabilitation122,000
(Base Construction Allocation - $106,000) (Design and Contingencies - $16,000)
(58) S.R.8008, I-84 - 380 Ramp Bridge, Roaring Brook Township, Bridge Rehabilitation106,000
(Base Construction Allocation - $92,000) (Design and Contingencies - $14,000)
(59) S.R.8015 and I-81 Ramp Bridge, South Abington Township, Bridge Rehabilitation154,000
(Base Construction Allocation - $134,000) (Design and Contingencies - $20,000)

Section 40. Lancaster County.

(a) Local Bridges
(1) Bart Township, T-389, Drywells Road over Meetinghouse Creek, Bridge Replacement420,000
(Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(2) Earl Township, T-810, White Oak Road over Big Conestoga Creek, BMS 36720908100304, Bridge Replacement585,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000)
(3) East Earl Township, T-894, Quarry Road over Conestoga River, Bridge Replacement470,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(4) Ephrata Township, T-648, Royer Road over Cocalico Creek, Bridge Replacement370,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(5) Rapho Township, T-364, Eby Chickies Road over Big Chickies Creek, Bridge Replacement645,000
(Base Construction Allocation - $550,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000)
(6) Rapho Township, T-875, Auction Road over Big Chickies Creek, Bridge Replacement395,000
(Base Construction Allocation - $325,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(7) Salisbury Township, T-487, Buena Vista Road over Pequea Creek, Bridge Replacement295,000
(Base Construction Allocation - $225,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(8) Salisbury Township, T-904, Mount Vernon Road over Pequea Creek, Bridge Replacement270,000
(Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(9) Pequea Township, T-492, Clearview Road Bridge over Goods Run, Bridge Replacement32,000
(Base Construction Allocation - $25,000) (Design and Contingencies - $7,000)
(10) Pequea Township, T-557, Shiprock Road Bridge over Small Run, Bridge Replacement105,000
(Base Construction Allocation - $90,000) (Design and Contingencies - $15,000)
(11) Pequea Township, T-557, Millwood Road Bridge over Goods Run at Intersection with Rawlinsville Road, Bridge Replacement102,000
(Base Construction Allocation - $90,000) (Design and Contingencies - $12,000)
(12) Pequea Township, T-557, Indian Hill Road Bridge over Goods Run, Bridge Replacement90,000
(Base Construction Allocation - $80,000) (Design and Contingencies - $10,000)
(13) Conestoga Township, T-418, Spring Run Road Bridge over Unnamed Branch of Tributary No.1 of Conestoga Creek, Bridge Replacement160,000
(Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(14) East Drumore Township, T-472, Maxwell Bridge Road over Tributary to Conowingo Creek, Bridge Replacement70,000
(Base Construction Allocation - $60,000) (Design and Contingencies - $10,000)
(15) Bart Township, T-451, Lamparter Road Bridge over West Branch of Octorara Creek, Bridge Replacement80,000
(Base Construction Allocation - $69,000) (Design and Contingencies - $11,000)
(16) Lititz Borough, East Lincoln Avenue Bridge over Santo Domingo Creek, Bridge Replacement506,000
(Base Construction Allocation - $440,000) (Design and Contingencies - $66,000)
(17) East Hempfield Township, Holland Street Bridge over Amtrak, Bridge Replacement350,000
(Base Construction Allocation - $285,000) (Design and Contingencies - $65,000)
(18) East Hempfield Township, Construct New Bridge on Good Drive over U.S.30, Bridge Construction2,400,000
(Base Construction Allocation - $1,900,000) (Land Allocation - $150,000) (Design and Contingencies - $350,000)
(19) East Lampeter Township, T-549, Hempstead Road over Stauffer Run, Bridge Rehabilitation200,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(20) Denver Borough, T-855, Bridge over Cocalico Creek, Bridge Rehabilitation300,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(21) East Lampeter Township, T-620, Mondale Road Bridge over Tributary of Conestoga River, Bridge Replacement110,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $10,000)
(22) Mt. Joy Borough, Construct New Bridge on Lumber Street over Amtrak Railroad, Bridge Construction510,000
(Base Construction Allocation - $375,000) (Land Allocation - $10,000) (Design and Contingencies - $125,000)
(23) Ephrata Township, T-656, Rettew Mill Road Bridge, Bridge Replacement00,000,000
(b) State Bridges
(1) S.R.1061, Willow Street over Tributary of Muddy Creek, Adamstown Borough, Bridge Replacement673,000
(Base Construction Allocation - $450,000) (Land Allocation - $55,000) (Design and Contingencies - $168,000)
(2) S.R.4009, Dillerville Road over Amtrak, Lancaster City, Bridge Replacement2,080,000
(Base Construction Allocation - $1,800,000) (Land Allocation - $10,000) (Design and Contingencies - $270,000)
(3) S.R.0272, Reading Road over Indian Run, Ephrata Township, Bridge Replacement1,275,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000)
(4) S.R.3016, Fairview Road over Conrail, Providence Township, Bridge Replacement1,605,000
(Base Construction Allocation - $1,388,000) (Land Allocation - $10,000) (Design and Contingencies - $207,000)
(5) S.R.3030, Conestoga Boulevard over Tributary of Conestoga River, Conestoga Township, Bridge Replacement150,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(6) S.R.0222, Railroad Bridge over S.R.0222, Providence Township, Bridge Removal300,000
(Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(7) S.R.1035, North Water Street Bridge over Lititz Run, Lititz Borough, Bridge Replacement253,000
(Base Construction Allocation - $220,000) (Design and Contingencies - $33,000)
(8) S.R.1035, North Water Street Bridge over Santo Domingo Creek, Lititz Borough, Bridge Replacement253,000
(Base Construction Allocation - $220,000) (Design and Contingencies - $33,000)
(9) S.R.0030, 6 Bridges from Columbia Borough to Reading Railroad, Columbia Borough and West Hempfield Township, Bridge Rehabilitation1,525,000
(Base Construction Allocation - $1,400,000) (Design and Contingencies - $125,000)
(10) S.R.4002, New Haven Street Bridge over Amtrak, Mt. Joy Borough, Bridge Replacement2,115,000
(Base Construction Allocation - $1,795,000) (Land Allocation - $50,000) (Design and Contingencies - $270,000)

Section 41. Lawrence County.

(a) Local Bridges
(1) Slippery Rock Township, T-741, (old Route 422) Rose Point Bridge No.1 over Slippery Rock Creek, Bridge Replacement870,000
(Base Construction Allocation - $800,000) (Land Allocation - $50,000) (Design and Contingencies - $20,000)
(2) Plain Grove Township, T-585, Cress Farm Road over Tributary of Taylor Run, Bridge Replacement120,000
(Base Construction Allocation - $106,000) (Design and Contingencies - $14,000)
(3) Plain Grove Township, T-543, Rodgers Road over Jameson Run, Bridge Replacement184,000
(Base Construction Allocation - $170,000) (Design and Contingencies - $14,000)
(4) Plain Grove Township, Black Road over Taylor Run, Bridge Replacement92,000
(Base Construction Allocation - $83,000) (Design and Contingencies - $9,000)
(5) Bridge No.72080537010 over Jameson Run, Bridge Replacement139,000
(Base Construction Allocation - $126,000) (Design and Contingencies - $13,000)
(6) Scott Township, Bridge No.37721004977016, Bridge Replacement1,141,000
(Base Construction Allocation - $1,027,000) (Design and Contingencies - $114,000)
(7) Bridge No.37720805851003 East of T-498 Intersection, Bridge Replacement129,000
(Base Construction Allocation - $116,000) (Design and Contingencies - $13,000)
(8) Slippery Rock Township, McConnels Mill Road over Slippery Rock Creek, Bridge Replacement78,000
(Base Construction Allocation - $70,000) (Design and Contingencies - $8,000)
(9) Scott Township, Bridge No.37721004857017, Bridge Replacement610,000
(Base Construction Allocation - $549,000) (Design and Contingencies - $61,000)
(10) Slippery Rock Township, Kildo Road Bridge over Unnamed Stream, Bridge Replacement581,000
(Base Construction Allocation - $523,000) (Design and Contingencies - $58,000)
(11) Bridge No.37720805431009 near T-508, Bridge Replacement332,000
(Base Construction Allocation - $299,000) (Design and Contingencies - $33,000)
(12) Plain Grove Township, Reese Road over Taylor Run, Bridge Replacement350,000
(Base Construction Allocation - $310,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(13) Union Township, Grandview Avenue Bridge over Tributary of Shenango River, 500 Feet South of T.R.224, Bridge Replacement210,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(14) Mahoning Township, T-505, Baird Road Bridge over Tributary of Coffee Run, Bridge Replacement450,000
(Base Construction Allocation - $400,000) (Land Allocation - $5,000) (Design and Contingencies - $45,000)
(15) City of New Castle, Big Run Extension, Bridge No.2 over Big Run, Bridge Replacement750,000
(Base Construction Allocation - $665,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000)
(16) New Beaver Borough, T-305, Bridge over Unnamed Beaver Tributary, Bridge Replacement350,000
(Base Construction Allocation - $320,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(17) Plain Grove Township, T-617, Bridge No.5 over Taylor Run, Bridge Replacement450,000
(Base Construction Allocation - $405,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(18) Little Beaver Township, T-306, Bridge over Tributary of North Fork Little Beaver Creek, Bridge Rehabilitation250,000
(Base Construction Allocation - $220,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(19) Little Beaver Township, T-315, Bridge over Tributary of North Fork Little Beaver Creek, Bridge Rehabilitation250,000
(Base Construction Allocation - $220,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(20) City of New Castle, Cascade Boulevard Bridge over Big Run, Bridge Removal100,000
(Base Construction Allocation - $85,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(21) Plain Grove Township, T-585, Cress Farm Road Bridge over Taylor Run Tributary, Bridge Replacement350,000
(Base Construction Allocation - $320,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(22) Plain Grove Township, T-537, Doughty Road Bridge over Jamison Run, Bridge Replacement350,000
(Base Construction Allocation - $325,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000)
(23) Wampum Borough, Main Street Bridge over Eckles Run, Bridge Rehabilitation250,000
(Base Construction Allocation - $230,000) (Land Allocation - 5,000) (Design and Contingencies - $15,000)
(24) Plain Grove Township, T-506, Mason Road Bridge over Jamison Run Tributary, Bridge Rehabilitation280,000
(Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(25) City of New Castle, Pool Road Bridge No.2 over Big Run, Bridge Removal150,000
(Base Construction Allocation - $130,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(26) Hickory Township, T-533, Rodgers Road Bridge over Hettenbaugh Run, Bridge Replacement300,000
(Base Construction Allocation - $280,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000)
(27) Hickory Township, T-535, Taylor Road Bridge over Hettenbaugh Run, Bridge Replacement280,000
(Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(28) City of New Castle, Willard Avenue Bridge over Tributary of Shenango River, Bridge Replacement265,000
(Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(29) Slippery Rock Township, T-395, Hell's Hollow Bridge over Hell Run, Bridge Rehabilitation175,000
(Base Construction Allocation - $147,000) (Land Allocation - $3,000) (Design and Contingencies - $25,000)
(30) Slippery Rock Township, T-415, McConnells Mill Bridge over Slippery Rock Creek, Bridge Replacement170,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $20,000)
(31) Wilmington Township, T-476, Banks Bridge over Neshannock Creek, Bridge Replacement170,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $20,000)
(b) State Bridges
(1) S.R.1012, Freue Mill Road over Big Run, Slippery Rock Township, Bridge Replacement1,210,000
(Base Construction Allocation - $1,150,000) (Land Allocation - $50,000) (Design and Contingencies - $10,000)
(2) S.R.1014, Pine Corners Road over I-79, Plain Grove Township, Bridge Replacement400,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(3) S.R.2028, Hills Hollow Road Bridge over Hill Run, Slippery Rock Township, Bridge Replacement450,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(4) S.R.2030, Mountville Road Bridge over Slippery Rock Creek, Slippery Rock and Perry Townships, Bridge Replacement400,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(5) S.R.0065, L.R.79, East Washington Street Bridge over Noshannock Creek, New Castle City, Bridge Replacement1,650,000
(Base Construction Allocation - $1,525,000) (Design and Contingencies - $125,000)
(6) S.R.0168, CSX & P&LE Underpass, Taylor Township, Bridge Replacement1,100,000
(Base Construction Allocation - $1,000,000) (Design and Contingencies - $100,000)
(7) S.R.1016, Liberty Road Bridge over Taylor Run, Plain Grove Township, Bridge Replacement350,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(8) S.R.1002, Hettenbaugh Bridge over Hettenbaugh Run, Neshannock Township, Bridge Replacement500,000

Section 42. Lebanon County.

(a) Local Bridges
(1) North Cornwall Township T-414, Dairy Road over Quittapahilla Creek, Bridge Replacement321,000
(Base Construction Allocation - $251,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(2) Union Township, T-615, Ridge Road over Trout Run, Bridge Replacement205,000
(Base Construction Allocation - $135,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(3) ((3) repealed July 8, 1994, P.L.444, No.74)
(4) Jackson Township, Flanagan Road Bridge, Bridge Replacement195,000
(Base Construction Allocation - $161,000) (Land Allocation - $14,000) (Design and Contingencies - $20,000)
(5) East Hanover Township, T-336, Coon Creek Road Bridge over Raccoon Creek, Bridge Replacement160,000
(6) Annville Township, South Spruce Street, Bridge Replacement200,000
(7) Borough of Cornwall, Whitman Road Bridge over Conrail and Eastern Enterprises Railroad Tracks, Bridge Removal80,000
(8) Borough of Cornwall, Culvert Street Bridge over Conrail and Eastern Enterprises Railroad Tracks, Bridge Removal80,000
(b) State Bridges
(1) S.R.0072, Bridge over Conrail, City of Lebanon, Bridge construction12,739,000
(Base Construction Allocation - $8,388,000) (Land Allocation - $1,601,000) (Design and Contingencies - $2,750,000)

Section 43. Lehigh County.

(a) Local Bridges
(1) Washington Township, T-787, West Gant Street over Trout Creek, Bridge Replacement175,000
(Base Construction Allocation - $135,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(2) Lowhill Township, T-649, Narris Road Bridge No.1 over Switzer Creek, Bridge Replacement145,000
(Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(3) Whitehall Township, Peach Bottom Road over Spring Creek, Bridge Replacement190,000
(Base Construction Allocation - $135,000) (Land Allocation - $25,000) (Design and Contingencies - $30,000)
(4) Whitehall Township, Eggert Road over Spring Creek, Bridge Replacement235,000
(Base Construction Allocation - $180,000) (Land Allocation - $25,000) (Design and Contingencies - $30,000)
(5) Whitehall Township, Overlook Lane over Spring Creek, Bridge Replacement215,000
(Base Construction Allocation - $160,000) (Land Allocation - $25,000) (Design and Contingencies - $30,000)
(6) Whitehall Township, Columbia Street over Coplay Creek, Bridge Replacement385,000
(Base Construction Allocation - $250,000) (Land Allocation - $100,000) (Design and Contingencies - $35,000)
(7) Lowhill Township, T-649, Narris Road Bridge No.2 over Switzer Creek, Bridge Replacement170,000
(Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(8) Macungie Borough, Hickory Lane over Tributary of Swabia Creek, Bridge Replacement160,000
(Base Construction Allocation - $110,000) (Land Allocation - $25,000) (Design and Contingencies - $25,000)
(9) City of Allentown, Union Boulevard over Lehigh River, Bridge Replacement5,520,000
(Base Construction Allocation - $5,000,000) (Land Allocation - $20,000) (Design and Contingencies - $500,000)
(10) City of Allentown, Reading Road over Cedar Creek, Bridge Replacement1,010,000
(Base Construction Allocation - $865,000) (Land Allocation - $20,000) (Design and Contingencies - $125,000)
(11) City of Allentown, Ward Street (15th Street) over Little Lehigh Creek, Bridge Replacement3,800,000
(Base Construction Allocation - $3,400,000) (Land Allocation - $20,000) (Design and Contingencies - $380,000)
(12) City of Allentown, 15th Street Bridge over Conrail and Little Lehigh Creek, Bridge Rehabilitation750,000
(Base Construction Allocation - $500,000) (Land Allocation - $100,000 (Design and Contingencies - $150,000)
(13) North Whitehall Township, T-687, Lehigh Street Bridge, Bridge Replacement150,000
(Base Construction Allocation - $135,000) (Design and Contingencies - $15,000)
(14) North Whitehall Township, T-695, Walnut Street Bridge No.1, Bridge Rehabilitation83,000
(Base Construction Allocation - $65,000) (Design and Contingencies - $18,000)
(15) North Whitehall Township, T-695, Walnut Street Bridge No.2, Bridge Rehabilitation105,000
(Base Construction Allocation - $85,000) (Design and Contingencies - $20,000)
(16) North Whitehall Township, T-712, Bridge at Overlook Road and Neffs-Laurys Road, Bridge Replacement141,000
(Base Construction Allocation - $120,000) (Design and Contingencies - $21,000)
(17) North Whitehall Township, T-702, Bridge at Riverview Road and Neffs-Laurys Road, Bridge Replacement118,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $18,000)
(18) North Whitehall Township, T-665, Excelsior Road Bridge over Coplay Creek, Bridge Replacement173,000
(Base Construction Allocation - $153,000) (Design and Contingencies - $20,000)
(19) North Whitehall Township, T-691, Wood Street Bridge over Coplay Creek, Bridge Replacement173,000
(Base Construction Allocation - $153,000) (Design and Contingencies - $20,000)
(20) North Whitehall Township, T-674C, Coplay Creek Road Bridge over Coplay Creek, Bridge Replacement185,000
(Base Construction Allocation - $163,000) (Design and Contingencies - $22,000)
(21) Heidelberg Township, T-778, Hunters Hill Road Bridge, Bridge Replacement137,000
(Base Construction Allocation - $125,000) (Design and Contingencies - $12,000)
(b) State Bridges
(1) S.R.0145 over Abandoned Conrail Line, Whitehall Township, Bridge Replacement240,000
(Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(2) S.R.3001 over Iron Run, Lower Macungie Township, Bridge Replacement624,000
(Base Construction Allocation - $480,000) (Land Allocation - $96,000) (Design and Contingencies - $48,000)
(3) I-78 over Iron Run, Weisenberg Township, Bridge Replacement120,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $20,000)
(4) S.R.0378 under Easton Avenue, City of Bethlehem, Bridge Replacement812,000
(Base Construction Allocation - $738,000) (Design and Contingencies - $74,000)
(5) S.R.0145 over Tributary of Coplay Creek, Whitehall Township, Bridge Replacement225,000
(Base Construction Allocation - $187,000) (Land Allocation - $19,000) (Design and Contingencies - $19,000)
(6) S.R.0378 under Catasaqua Road, City of Bethlehem, Bridge Replacement742,000
(Base Construction Allocation - $674,000) (Design and Contingencies - $68,000)
(7) S.R.1015 over S.R.0022, Whitehall Township, Bridge Replacement569,000
(Base Construction Allocation - $517,000) (Design and Contingencies - $52,000)
(8) S.R.2032 over Spring Creek, Upper Saucon Township, Bridge Replacement140,000
(Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(9) S.R.0145 over Jordan Creek, City of Allentown, Bridge Replacement2,660,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $460,000) (Design and Contingencies - $200,000)
(10) S.R.2055, Alburtis Meyers Bridge over Harrison St., Lawrence St., Little Lehigh Creek and Railroad, City of Allentown, Bridge Replacement2,200,000
(Base Construction Allocation - $2,000,000) (Design and Contingencies - $200,000)
(11) S.R.2030, Centennial Bridge over Saucon Creek, Upper Saucon Township, Bridge Replacement950,000
(Base Construction Allocation - $830,000) (Land Allocation - $25,000) (Design and Contingencies - $95,000)
(12) Tilghman Street Bridge over Lehigh River, City of Allentown, Bridge Rehabilitation4,100,000
(Base Construction Allocation - $3,550,000) (Land Allocation - $100,000) (Design and Contingencies - $450,000)
(13) S.R.0022, Bridge over Lehigh River, Whitehall Township, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(14) S.R.0022, Bridge over Lehigh Canal, Hanover Township, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(15) S.R.2055, 8th Street Bridge over Little Lehigh Creek, City of Allentown, Bridge Rehabilitation1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)

Section 44. Luzerne County.

(a) Local Bridges
(1) Nescopeck Township, T-376, Bridge over Nescopeck Creek, Bridge Replacement418,000
(Base Construction Allocation - $324,000) (Land Allocation - $10,000) (Design and Contingencies - $84,000)
(2) Lehman Township, T-581, Bridge over Inlet Pikes Creek Reservoir, Bridge Replacement260,000
(Base Construction Allocation - $194,000) (Land Allocation - $15,000) (Design and Contingencies - $51,000)
(3) Ross Township, County Road Bridge No.1 over Hunlock Creek, Bridge Replacement269,000
(Base Construction Allocation - $194,000) (Land Allocation - $15,000 (Design and Contingencies - $60,000
(4) Kingston Township, County Road Bridge No.16 over Toby's Creek, Bridge Replacement379,000
(Base Construction Allocation - $301,000) (Design and Contingencies - $78,000)
(5) Black Creek Township, T-309, Bridge over Falls Run, Bridge Replacement280,000
(Base Construction Allocation - $210,000) (Land Allocation - $15,000 (Design and Contingencies - $55,000)
(6) Jackson Township, T-704, Bridge over Branch of Harveys Creek, Bridge Replacement260,000
(Base Construction Allocation - $194,000) (Land Allocation - $15,000 (Design and Contingencies - $51,000)
(7) Union Township, T-451, Bridge over Shickshinny Creek, Bridge Replacement269,000
(Base Construction Allocation - $194,000) (Land Allocation - $15,000 (Design and Contingencies - $60,000)
(8) Sugarloaf Township, County Road Bridge No.37 over Little Nescopeck Creek, Bridge Replacement368,000
(Base Construction Allocation - $292,000) (Design and Contingencies - $76,000)
(9) Sugarloaf Township, T-332, Bridge over Nescopeck Creek, Bridge Replacement422,000
(Base Construction Allocation - $335,000) (Design and Contingencies - $87,000)
(10) Hanover Township, Oxford Street over Solomon's Creek, Bridge Replacement368,000
(Base Construction Allocation - $292,000) (Design and Contingencies - $76,000)
(11) Fairmount Township, T-620, Bridge over Phillips Creek, Bridge Replacement277,000
(Base Construction Allocation - $212,000) (Design and Contingencies - $65,000)
(12) Hanover Township, East Division Street over Solomon's Creek, Bridge Replacement251,000
(Base Construction Allocation - $199,000) (Design and Contingencies - $52,000)
(13) Dorrance Township, T-404, Bridge over Little Wapwallopen Creek, Bridge Replacement260,000
(Base Construction Allocation - $194,000) (Land Allocation - $15,000) (Design and Contingencies - $51,000)
(14) Butler Township, County Road Bridge No.41 over Nescopeck Creek, Bridge Replacement260,000
(Base Construction Allocation - $194,000) (Land Allocation - $15,000) (Design and Contingencies - $51,000)
(15) Dorrance Township, T-387, Bridge over Wapwallopen Creek, Bridge Replacement341,000
(Base Construction Allocation - $259,000) (Land Allocation - $15,000) (Design and Contingencies - $67,000)
(16) Dorrance Township, County Road Bridge No.29 over Wapwallopen Creek, Bridge Replacement225,000
(Base Construction Allocation - $160,000) (Design and Contingencies - $65,000)
(17) Lehman Township, T-322, Bridge No.14 Maskenozha Bridge over Lake Maskenozha Outlet, Bridge Replacement210,000
(Base Construction Allocation - $165,000) (Land Allocation - $20,000) (Design and Contingencies - $25,000)
(18) Nescopeck Township, T-453 over Tributary to Nescopeck Creek No.044090201, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(19) Duryea Borough, Stephenson Street over Lackawanna River, Bridge Replacement330,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $30,000)
(20) Dupont Borough, Bridge on Elm Street over Mill Creek, Bridge Replacement240,000
(Base Construction Allocation - $220,000) (Design and Contingencies - $20,000)
(21) City of Wilkes-Barre, Govier Street over Laurel Run Creek, Bridge Replacement31,000
(Base Construction Allocation - $25,000) (Design and Contingencies - $6,000)
(22) City of Wilkes-Barre, Sidney Street over Mill Creek, Bridge Replacement59,000
(Base Construction Allocation - $50,000) (Design and Contingencies - $9,000)
(23) City of Wilkes-Barre, Regent Street over Solomon's Creek, Bridge Replacement26,000
(Base Construction Allocation - $20,000) (Design and Contingencies - $6,000)
(24) City of Wilkes-Barre, Strauss Street over Solomon's Creek, Bridge Replacement16,000
(Base Construction Allocation - $12,000) (Design and Contingencies - $4,000)
(25) City of Wilkes-Barre, Barney Street over Solomon's Creek, Bridge Replacement15,000
(Base Construction Allocation - $11,000) (Design and Contingencies - $4,000)
(26) City of Wilkes-Barre, Franklin Street over Solomon's Creek, Bridge Replacement59,000
(Base Construction Allocation - $50,000) (Design and Contingencies - $9,000)
(27) City of Wilkes-Barre, Walker Street over Solomon's Creek, Bridge Replacement175,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $25,000)
(28) City of Wilkes-Barre, Mill Street over Laurel Run Creek, Bridge Replacement175,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $25,000)
(29) City of Wilkes-Barre, Scott Street over Coal Brook, Bridge Replacement120,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $20,000)
(30) City of Wilkes-Barre, Waller Street over Solomon's Creek No.044091245, Bridge Replacement175,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $25,000)
(31) Butler Township, County Road Bridge No.1 over Nescopeck Creek, Bridge Replacement280,000
(Base Construction Allocation - $210,000) (Land Allocation - $15,000) (Design and Contingencies - $55,000)
(32) Pittston Township, Langan's Road, Bridge Replacement100,000
(33) Pittston Township, T-502, Bridge, Bridge Rehabilitation100,000
(34) Fairview Township, T-462, Bridge over Conrail, Bridge Replacement1,100,000
(35) Hanover Township, Truesdale Terrace, Witinski Villa Bridge, Bridge Removal50,000
(36) Hanover Township, Clarks Cross-road Bridge, Bridge Replacement45,000
(37) Ashley Borough, Charles Street, County Bridge No.1 over Tributary of Solomon's Creek, Bridge Replacement92,000
(38) Ashley Borough, Conyngham Street, County Bridge No.2 over Tributary of Solomon's Creek, Bridge Replacement131,000
(39) Ashley Borough, West Hartford Street, County Bridge No.3 over Tributary of Solomon's Creek, Bridge Replacement120,000
(40) Ashley Borough, Belles Alley, County Bridge No.4 over Tributary of Solomon's Creek, Bridge Replacement78,000
(41) Ashley Borough, Brown Street, County Bridge No.5 over Tributary of Solomon's Creek, Bridge Replacement92,000
(42) Ashley Borough, Carey Street, County Bridge No.6 over Tributary of Solomon's Creek, Bridge Replacement151,000
(43) Ashley Borough, Carey Street, County Bridge No.7 over Solomon's Creek, Bridge Replacement236,000
(44) Ashley Borough, Cemetery Street, County Bridge No.8 over Solomon's Creek, Bridge Replacement189,000
(45) Ashley Borough, Rodgers Avenue, County Bridge No.9 over Solomon's Creek, Bridge Replacement216,000
(46) Ashley Borough, Frederick Street, County Bridge No.10 over Sugar Notch Run, Bridge Replacement54,000
(47) Ashley Borough, Sively Street, County Bridge No.11 over Sugar Notch Run, Bridge Replacement186,000
(48) Sugarloaf Township, Bridge Located 725 Feet Southeast of the Intersection of S.R.0093 and T-388, Bridge Replacement50,000
(49) Sugarloaf Township, Bridge Located 175 Feet Southeast of the Intersection of S.R.0093 and T-388, Bridge Replacement62,000
(50) Sugarloaf Township, Bridge Located 125 Feet South of the Intersection of County Road No.40 and T-388, Bridge Replacement73,000
(51) Nanticoke City, Union Street, Bridge over Forge Creek, Bridge Replacement160,000
(Base Construction Allocation - $125,000) (Design and Contingencies - $35,000)
(52) Nanticoke City, North Market Street Bridge over Newport Creek, Bridge Replacement259,000
(Base Construction Allocation - $214,000) (Design and Contingencies - $45,000)
(53) Exeter Borough, Bridge over Hicks Creek, Bridge Rehabilitation50,000
(b) State Bridges
(1) S.R.2035, Bridge over Little Mill Creek, Pittston Township, Bridge Replacement648,000
(Base Construction Allocation - $570,000) (Land Allocation - $10,000) (Design and Contingencies - $68,000)
(2) S.R.2035, Bridge over Meadow Run, Bear Creek Township, Bridge Replacement480,000
(Base Construction Allocation - $420,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(3) S.R.2020, Bridge over Branch of Mill Creek, Plains Township, Bridge Replacement382,000
(Base Construction Allocation - $332,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(4) S.R.2004, Bridge over Railroad, Plains Township, Bridge Replacement1,350,000
(Base Construction Allocation - $1,197,000) (Land Allocation - $10,000) (Design and Contingencies - $143,000)
(5) S.R.4016, Bridge over Hunlock Creek No.044091233, Hunlock Township, Bridge Replacement1,130,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000)
(6) S.R.1021, Bridge over Abraham's Creek No.044091234, Kingston Township, Bridge Replacement540,000
(Base Construction Allocation - $472,000) (Land Allocation - $10,000) (Design and Contingencies - $58,000)
(7) S.R.4008, Bridge over Branch of Huntington Creek No.044091232, Huntington Township, Bridge Replacement346,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $36,000)
(8) S.R.4007, Bridge over Shickshinny Creek No.044091231, Union Township, Bridge Replacement752,000
(Base Construction Allocation - $662,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000)
(9) S.R.1032, Bridge over Pikes Creek No.0044091225, Lake Township, Bridge Replacement486,000
(Base Construction Allocation - $425,000) (Land Allocation - $10,000) (Design and Contingencies - $51,000)
(10) S.R.0029, Bridge over Abandoned Railroad, Sugar Notch Borough, Bridge Replacement1,920,000
(Base Construction Allocation - $1,710,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000)
(11) S.R.0309, Bridge over Railroad and Nanticoke Creek, Hanover Township, Bridge Replacement2,760,000
(Base Construction Allocation - $2,500,000) (Land Allocation - $10,000) (Design and Contingencies - $250,000)
(12) S.R.0081, Bridge over Conrail, Hazle Township, Bridge Replacement1,540,000
(Base Construction Allocation - $1,370,000) (Land Allocation - $10,000) (Design and Contingencies - $160,000)
(13) S.R.0081, Bridge over Conrail, Hazle Township, Bridge Replacement1,540,000
(Base Construction Allocation - $1,370,000) (Land Allocation - $10,000) (Design and Contingencies - $160,000)
(14) S.R.1026, Bridge over Leonards Creek, Dallas Township, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(15) S.R.0029, Bridge over Haul Road, Hanover Township, Bridge Replacement2,925,000
(Base Construction Allocation - $2,615,000) (Land Allocation - $10,000) (Design and Contingencies - $300,000)
(16) S.R.1035, Bridge over Cider Run Creek, Franklin Township, Bridge Replacement458,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $48,000)
(17) S.R.3005, Bridge over Black Brook, Slocum Township, Bridge Replacement587,000
(Base Construction Allocation - $515,000) (Land Allocation - $10,000) (Design and Contingencies - $62,000)
(18) S.R.2045, Bridge over Branch of Wapwallopen Creek, Bridge Replacement738,000
(Base Construction Allocation - $650,000) (Land Allocation - $10,000) (Design and Contingencies - $78,000)
(19) S.R.3005, Bridge over Black Brook, Slocum Township, Bridge Replacement620,000
(Base Construction Allocation - $545,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000)
(20) S.R.3011, Bridge over Wapwallopen Creek, Hollenback Township, Bridge Replacement738,000
(Base Construction Allocation - $650,000) (Land Allocation - $10,000) (Design and Contingencies - $78,000)
(21) S.R.0029, Bridge over T.R.11, Plymouth Township, Bridge Replacement470,000
(Base Construction Allocation - $410,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(22) S.R.3020, Bridge over Branch of Black Creek, Black Creek Township, Bridge Replacement540,000
(Base Construction Allocation - $472,000) (Land Allocation - $10,000) (Design and Contingencies - $58,000)
(23) S.R.2035, Bridge over Little Mille Creek, Pittston Township, Bridge Replacement648,000
(Base Construction Allocation - $570,000) (Land Allocation - $10,000) (Design and Contingencies - $68,000)
(24) S.R.0239, Bridge over Shickshinny Creek, Union Township, Bridge Replacement850,000
(Base Construction Allocation - $750,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000)
(25) S.R.1036, Bridge over Leonards Creek, Kingston Township, Bridge Replacement775,000
(Base Construction Allocation - $684,000) (Land Allocation - $10,000) (Design and Contingencies - $81,000)
(26) S.R.0404, Bridge over Little Shickshinny Creek, Salem Township, Bridge Replacement822,000
(Base Construction Allocation - $725,000) (Land Allocation - $10,000) (Design and Contingencies - $87,000)
(27) S.R.1036, Bridge over Toby Creek, Kingston Township, Bridge Replacement640,000
(Base Construction Allocation - $563,000) (Land Allocation - $10,000) (Design and Contingencies - $67,000)
(28) S.R.1013, Bridge over Toby Creek, Luzerne Borough, Bridge Replacement1,218,000
(Base Construction Allocation - $1,078,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000)
(29) S.R.1032, Bridge over Branch of Bear Hollow Creek, Lake Township, Bridge Replacement503,000
(Base Construction Allocation - $440,000) (Land Allocation - $10,000) (Design and Contingencies - $53,000)
(30) S.R.2008, Bridge over Nanticoke Creek, Hanover Township, Bridge Replacement628,000
(Base Construction Allocation - $552,000) (Land Allocation - $10,000) (Design and Contingencies - $66,000)
(31) S.R.2005, Bridge over Bowman Spring Run, City of Wilkes-Barre, Bridge Replacement510,000
(Base Construction Allocation - $447,000) (Land Allocation - $10,000) (Design and Contingencies - $53,000)
(32) S.R.2015, Bridge over Gardner Creek, Laflin Borough, Bridge Replacement592,000
(Base Construction Allocation - $520,000) (Land Allocation - $10,000) (Design and Contingencies - $62,000)
(33) S.R.2017, Bridge over S.R.3031, Jenkins Township, Bridge Replacement1,156,000
(Base Construction Allocation - $1,034,000) (Land Allocation - $10,000) (Design and Contingencies - $112,000)
(34) S.R.2020, Bridge over Branch of Mill Creek, Plains Township, Bridge Replacement382,000
(Base Construction Allocation - $332,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(35) S.R.2020, Bridge over Mill Creek, Plains Township, Bridge Replacement727,000
(Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $77,000)
(36) S.R.2026, Bridge over Gardners Creek, Laflin Borough, Bridge Replacement772,000
(Base Construction Allocation - $680,000) (Land Allocation - $10,000) (Design and Contingencies - $82,000)
(37) S.R.0118, Bridge over Branch of Harveys Creek, Lehman Township, Bridge Replacement604,000
(Base Construction Allocation - $530,000) (Land Allocation - $10,000) (Design and Contingencies - $64,000)
(38) S.R.1010, Bridge over Abrahams Creek, West Wyoming Borough, Bridge Replacement1,230,000
(Base Construction Allocation - $1,087,000) (Land Allocation - $10,000) (Design and Contingencies - $133,000)
(39) S.R.2002, Bridge over Solomon's Creek, Hanover Township, Bridge Replacement1,475,000
(Base Construction Allocation - $1,308,000) (Land Allocation - $10,000) (Design and Contingencies - $157,000)
(40) S.R.2029, Bridge over Mill Creek, Avoca Borough, Bridge Replacement984,000
(Base Construction Allocation - $870,000) (Land Allocation - $10,000) (Design and Contingencies - $104,000)
(41) S.R.2035, Bridge over Branch of Meadow Run, Bear Creek Township, Bridge Replacement525,000
(Base Construction Allocation - $460,000) (Land Allocation - $10,000) (Design and Contingencies - $55,000)
(42) S.R.2035, Bridge over Bear Creek, Bear Creek Township, Bridge Replacement442,000
(Base Construction Allocation - $395,000) (Land Allocation - $10,000) (Design and Contingencies - $37,000)
(43) S.R. 2020, Bridge over Mill Creek, Plains Township, Bridge Replacement727,000
(Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $77,000)
(44) S.R.2017, Bridge over S.R.2021, Jenkins Township, Bridge Replacement1,156,000
(Base Construction Allocation - $1,034,000) (Land Allocation - $10,000) (Design and Contingencies - $112,000)
(45) S.R.2021, Culvert Segment 0020, Offset 2190, Pittston Township, Bridge Replacement300,000
(Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(46) S.R.2024, Culvert Segment 0110, Offset 0000 PI No.044092201, Jenkins Township, Bridge Replacement200,000
(Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(47) S.R.0029, Bridge over Township Road, Railroad Tracks and Creek, Hanover Township, Bridge Rehabilitation397,000
(Base Construction Allocation - $345,000) (Design and Contingencies - $52,000)
(48) S.R.0029, Sans Souci Bridge over Sans Souci Highway, Hanover Township, Bridge Rehabilitation337,000
(Base Construction Allocation - $293,000) (Design and Contingencies - $44,000)
(49) S.R.0080, 2 Bridges over Nescopeck Creek, Black Creek Township, Bridge Rehabilitations272,000
(Base Construction Allocation - $237,000) (Design and Contingencies - $35,000)
(50) S.R.0081, 27 Bridges from Butler Township and Dupont Borough, Bridge Rehabilitations7,571,000
(Base Construction Allocation - $6,549,000) (Design and Contingencies - $1,022,000)
(51) S.R.0093, Bridge over Nescopeck Creek, Sugarloaf Township, Bridge Rehabilitation104,000
(Base Construction Allocation - $90,000) (Design and Contingencies - $14,000)
(52) S.R.0115, Bridge over Lehigh River at the Monroe County Line, Buck Township, Bridge Rehabilitation115,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $15,000)
(53) S.R.0115, Bear Creek Bridge over Outlet to Bear Creek Lake, Bear Creek Township, Bridge Rehabilitation106,000
(Base Construction Allocation - $91,000) (Design and Contingencies - $15,000)
(54) S.R.0118, Harvey's Creek Bridge over Harvey's Creek, Lehman Township, Bridge Rehabilitation109,000
(Base Construction Allocation - $94,000) (Design and Contingencies - $15,000)
(55) S.R.0309, Bridge over Nescopeck Creek, Butler Township, Bridge Rehabilitation153,000
(Base Construction Allocation - $133,000) (Design and Contingencies - $20,000)
(56) S.R.0309, Bridge over Railroad, City of Hazleton, Bridge Rehabilitation101,000
(Base Construction Allocation - $88,000) (Design and Contingencies - $13,000)
(57) S.R.0924, Bridge over I-81 at Exit 40, Hazel Township, Bridge Rehabilitation137,000
(Base Construction Allocation - $119,000) (Design and Contingencies - $18,000)
(58) S.R.1061, Harvey Creek Bridge over Harvey Creek, Lehman Township, Bridge Rehabilitation115,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $15,000)
(59) S.R.2008, Bridge over Pa.29, Hanover Township, Bridge Rehabilitation328,000
(Base Construction Allocation - $285,000) (Design and Contingencies - $43,000)
(60) S.R.2010, Bridge over Pa.29, Sugar Notch Borough, Bridge Rehabilitation150,000
(Base Construction Allocation - $130,000) (Design and Contingencies - $20,000)
(61) S.R.3036, Bridge over Conrail Tracks, Nescopeck Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $156,000) (Design and Contingencies - $24,000)
(62) S.R.3042, Nescopeck Bridge over Nescopeck Creek, Nescopeck Township, Bridge Rehabilitation106,000
(Base Construction Allocation - $91,000) (Design and Contingencies - $15,000)
(63) S.R.2021, Bridge, Pittston Township, Bridge Replacement300,000
(64) S.R.2024, Bridge, Jenkins Township, Bridge Replacement200,000

Section 45. Lycoming County.

(a) Local Bridges
(1) Armstrong Township, T-329 over Mosquito Creek, Bridge Replacement427,000
(Base Construction Allocation - $342,000) (Land Allocation - $21,000) (Design and Contingencies - $64,000)
(2) Armstrong Township, T-434 over Mosquito Creek, Bridge Replacement541,000
(Base Construction Allocation - $433,000) (Land Allocation - $27,000) (Design and Contingencies - $81,000)
(3) Brown Township, T-762 over Jacobs Run, Bridge Replacement411,000
(Base Construction Allocation - $329,000) (Land Allocation - $21,000) (Design and Contingencies - $61,000)
(4) Cascade Township, T-665 over Potash Hollow Creek, Bridge Replacement214,000
(Base Construction Allocation - $171,000) (Land Allocation - $11,000) (Design and Contingencies - $32,000)
(5) Franklin Township, T-710 over Beaver Run, Bridge Replacement265,000
(Base Construction Allocation - $212,000) (Land Allocation - $13,000) (Design and Contingencies - $40,000)
(6) Hepburn Township, T-510 over Mill Creek, Bridge Replacement303,000
(Base Construction Allocation - $257,000) (Design and Contingencies - $46,000)
(7) Jordan Township, T-740 over Muncy Creek, Northeast of Lairdsville, Bridge Replacement321,000
(Base Construction Allocation - $269,000) (Land Allocation - $29,000) (Design and Contingencies - $23,000)
(8) Lewis Township, T-856 over Pleasant Stream, Bridge Replacement424,000
(Base Construction Allocation - $302,000) (Land Allocation - $19,000) (Design and Contingencies - $103,000)
(9) Lewis Township, T-629 over Slacks Run, Bridge Replacement356,000
(Base Construction Allocation - $285,000) (Land Allocation - $18,000) (Design and Contingencies - $53,000)
(10) Lewis Township, T-836 over Trout Run, Bridge Replacement321,000
(Base Construction Allocation - $257,000) (Land Allocation - $16,000) (Design and Contingencies - $48,000)
(11) Moreland Township, T-664 over German Run, Bridge Replacement300,000
(Base Construction Allocation - $240,000) (Land Allocation - $15,000) (Design and Contingencies - $45,000)
(12) Moreland Township, T-668, Kramer Hill Road over Sugar Run, Bridge Replacement245,000
(Base Construction Allocation - $196,000) (Land Allocation - $12,000) (Design and Contingencies - $37,000)
(13) Moreland Township, T-447 over Laurel Run No.1, Bridge Replacement311,000
(Base Construction Allocation - $264,000) (Land Allocation - $15,000) (Design and Contingencies - $32,000)
(14) Moreland Township, T-638 over Laurel Run, Bridge Replacement285,000
(Base Construction Allocation - $228,000) (Land Allocation - $14,000) (Design and Contingencies - $43,000)
(15) Penn Township, T-654 over Greggs Run, Bridge Replacement225,000
(Base Construction Allocation - $180,000) (Land Allocation - $11,000) (Design and Contingencies - $34,000)
(16) Penn/Franklin Township, T-706 over Beaver Run, Bridge Replacement272,000
(Base Construction Allocation - $217,000) (Land Allocation - $14,000) (Design and Contingencies - $41,000)
(17) Pine Township, T-776 over English Run No.2, Bridge Replacement325,000
(Base Construction Allocation - $260,000) (Land Allocation - $16,000) (Design and Contingencies - $49,000)
(18) Pine Township, T-782 over Rock Run, Bridge Replacement225,000
(Base Construction Allocation - $180,000) (Land Allocation - $11,000) (Design and Contingencies - $34,000)
(19) Pine Township, T-782 over Texas Creek No.1, Bridge Replacement484,000
(Base Construction Allocation - $387,000) (Land Allocation - $24,000) (Design and Contingencies - $73,000)
(20) Shrewsbury Township, T-658 over Big Run, Bridge Replacement250,000
(Base Construction Allocation - $210,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(21) Shrewsbury Township, T-686 over Rock Run No.1, Bridge Replacement305,000
(Base Construction Allocation - $244,000) (Land Allocation - $15,000) (Design and Contingencies - $46,000)
(22) Shrewsbury Township, T-686 over Rock Run No.2, Bridge Replacement262,000
(Base Construction Allocation - $202,000) (Land Allocation - $13,000) (Design and Contingencies - $47,000)
(23) Washington Township, T-397 over White Deer Hole Creek, Bridge Replacement204,000
(Base Construction Allocation - $170,000) (Land Allocation - $19,000) (Design and Contingencies - $15,000)
(24) Wolf Township, T-250 over Greggs Run, Bridge Replacement290,000
(Base Construction Allocation - $245,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(25) Loyalsock Township, Miller Street between Williamsport City Line and Warren Avenue, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(26) Clinton Township, T-801 over Black Hole Creek, Bridge Replacement260,000
(Base Construction Allocation - $210,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(27) Jackson Township, T-816 over Blockhouse Creek, Bridge Rehabilitation145,000
(Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(28) Cogan House Township, T-784 over Larry's Creek, Bridge Rehabilitation105,000
(Base Construction Allocation - $60,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000)
(b) State Bridges
(1) S.R.3018, T-842, First Forks Road Bridge over First Fork Larry's Creek, Mifflin Township, Bridge Replacement425,000
(Base Construction Allocation - $340,000) (Land Allocation - $64,000) (Design and Contingencies - $21,000)
(2) S.R.0015, U.S.15 Bridges North of I-180, 4 Bridges, City of Williamsport, Bridge Rehabilitations487,000
(Base Construction Allocation - $449,000) (Design and Contingencies - $38,000)
(3) S.R.0220, Williamsport Beltway, 3 Bridges, City of Williamsport, Bridge Rehabilitations360,000
(Base Construction Allocation - $327,000) (Design and Contingencies - $33,000)

Section 46. McKean County.

(a) Local Bridges
(1) Foster Township, T-360, Bridge over Tuna Creek, Bridge Reconstruction33,000
(Base Construction Allocation - $25,000) (Design and Contingencies - $8,000)
(b) State Bridges
(1) S.R.0046, Haven Brook Bridge over Havens Brook, Norwich Township, Bridge Replacement700,000
(Base Construction Allocation - $500,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(2) S.R.0770, Sheppard Run Bridge over Sheppard Run, Bradford Township, Bridge Replacement725,000
(Base Construction Allocation - $525,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(3) S.R.0046, Bridge over Havens Brook, Norwich Township, Bridge Replacement700,000
(Base Construction Allocation - $500,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(4) S.R.0770, Bridge over Sheppard Run, Bradford Township, Bridge Replacement725,000
(Base Construction Allocation - $525,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(5) S.R.0006, Bridge over Allegheny River, Port Allegheny Borough, Bridge Replacement4,050,000
(Base Construction Allocation - $3,600,000) (Land Allocation - $150,000) (Design and Contingencies - $300,000)
(6) S.R.0006, Bridge over Conrail, Port Allegheny Borough, Bridge Replacement1,850,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(7) S.R.0155, Bridge over Allegheny River, Port Allegheny Borough, Bridge Replacement2,550,000
(Base Construction Allocation - $2,150,000) (Land Allocation - $150,000) (Design and Contingencies - $250,000)
(8) S.R.0155, Bridge over Rock Run, Annin Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(9) S.R.0219, Bradford Bypass Bridge over S.R.0346 and S.R.4013, Foster Township, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $50,000)
(10) S.R.3006, Bridge over Kinzua Creek, Lafayette Township, Bridge Replacement1,250,000
(Base Construction Allocation - $950,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(11) S.R.4004, Tunungawant Creek Bridge No.1 over West Branch of Tunungawant Creek, Bradford Township, Bridge Replacement1,250,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)

Section 47. Mercer County.

(a) Local Bridges
(1) Bridge No.43710104232323, Bridge Replacement315,000
(Base Construction Allocation - $280,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(2) Fairview Township, McCartney Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(3) Findley Township, Cribbs Road, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(4) Coalspring Township, McEwen Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(5) Hermitage Borough, Kelly Road, Bridge Replacement851,000
(Base Construction Allocation - $784,000) (Land Allocation - $7,000) (Design and Contingencies - $60,000)
(6) Hempfield Township, Blahert Road, Bridge Replacement220,000
(Base Construction Allocation - $190,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(7) Perry Township, Pierson Road, Bridge Replacement647,000
(Base Construction Allocation - $558,000) (Land Allocation - $5,000) (Design and Contingencies - $84,000)
(8) Jefferson Township, Fullingmill Road, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(9) Hermitage Borough, Kelley Road, Bridge Replacement1,020,000
(Base Construction Allocation - $941,000) (Land Allocation - $7,000) (Design and Contingencies - $72,000)
(10) Lake Township, Cannon Road, Bridge Replacement414,000
(Base Construction Allocation - $335,000) (Land Allocation - $5,000) (Design and Contingencies - $74,000)
(11) Grove City, East Pine Street, Bridge Replacement867,000
(Base Construction Allocation - $794,000) (Land Allocation - $5,000) (Design and Contingencies - $68,000)
(12) City of Sharon, Oakland Avenue, Bridge Replacement3,757,000
(Base Construction Allocation - $3,180,000) (Land Allocation - $100,000) (Design and Contingencies - $477,000)
(13) French Creek Township, Lower Road, Bridge Replacement398,000
(Base Construction Allocation - $320,000) (Land Allocation - $5,000) (Design and Contingencies - $73,000)
(14) Wolf Creek Township, Jack Road, Bridge Replacement320,000
(Base Construction Allocation - $274,000) (Land Allocation - $5,000) (Design and Contingencies - $41,000)
(15) Sandy Lake, Walnut Street, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(16) Perry Township, Mill Road, Bridge Replacement593,000
(Base Construction Allocation - $511,000) (Land Allocation - $5,000) (Design and Contingencies - $77,000)
(17) New Vernon Township, Betty Boyde Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(18) Fairview Township, Genger Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(19) Lake Township, Steckler Road, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(20) Shenango Township, Riggs Road, Bridge Replacement252,000
(Base Construction Allocation - $220,000) (Land Allocation - $5,000) (Design and Contingencies - $27,000)
(21) Wolf Creek Township, Gill Road, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(22) Greenville, Race Street, Bridge Replacement778,000
(Base Construction Allocation - $672,000) (Land Allocation - $5,000) (Design and Contingencies - $101,000)
(23) Sugar Grove Township, Gardner Hill Road, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(24) Findley Township, Uber Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(25) Mill Creek Township, Deemers Road, Bridge Replacement285,000
(Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(26) Wolf Creek Township, Gilmore Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(27) Grove City, Chestnut Street, Bridge Replacement2,871,000
(Base Construction Allocation - $2,666,000) (Land Allocation - $5,000) (Design and Contingencies - $200,000)
(28) Sandy Creek Township, County Line Road, Bridge Replacement297,000
(Base Construction Allocation - $254,000) (Land Allocation - $5,000) (Design and Contingencies - $38,000)
(29) Lake Township, Farm Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(30) West Middlesex, Cemetery Road, Bridge Replacement297,000
(Base Construction Allocation - $254,000) (Land Allocation - $5,000) (Design and Contingencies - $38,000)
(31) Jefferson Township, Clay Furnace Road, Bridge Replacement208,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(32) Jackson Township, Fox Mine Road, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(33) City of Hermitage, T-388, Kelly Road Bridge No.1 over Shenango River, Bridge Replacement851,000
(Base Construction Allocation - $784,000) (Land Allocation - $7,000) (Design and Contingencies - $60,000)
(34) French Creek Township, T-895 over French Creek Branch, Bridge Replacement86,000
(Base Construction Allocation - $68,000) (Land Allocation - $9,000) (Design and Contingencies - $9,000)
(35) Liberty Township, T-800 on Jervis Road over Slippery Rock Branch, Bridge Replacement105,000
(Base Construction Allocation - $83,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(b) State Bridges
(1) S.R.0062 over Shenango River, Bridge Replacement1,550,000
(Base Construction Allocation - $1,400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(2) S.R.0062 over South Dock Valley Way, Bridge Replacement1,850,000
(Base Construction Allocation - $1,700,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(3) S.R.0062 over Conrail, Bridge Replacement1,750,000
(Base Construction Allocation - $1,600,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(4) S.R.0058 on Kinsman Road over Sugar Run, Greene Township, Bridge Replacement300,000
(Base Construction Allocation - $255,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000)
(5) S.R.3022 on Rutledge Road over Lackawannock Creek, Jefferson Township, Bridge Replacement300,000
(Base Construction Allocation - $255,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000)
(6) S.R.0318 on West Middlesex-Mercer Road over Little Neshannock Creek, East Lackawannock Township, Bridge Replacement430,000
(Base Construction Allocation - $365,000) (Land Allocation - $20,000) (Design and Contingencies - $45,000)
(7) S.R.3013 on Orchard Road over Interstate 80, BMS 4330130070000, Lackawannock Township, Bridge Rehabilitation900,000
(Base Construction Allocation - $765,000) (Land Allocation - $45,000) (Design and Contingencies - $90,000)
(8) S.R.0019 on Perry Highway over Tributary of Little Shenango River, Perry Township, Bridge Replacement210,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(9) S.R.0718 on State Street over Shenango River, City of Sharon, Bridge Rehabilitation800,000
(Base Construction Allocation - $680,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000)
(10) S.R.0019, Bridge over Neshannock Creek, Springfield Township, Bridge Replacement1,500,000
(Base Construction Allocation - $1,330,000) (Land Allocation - $30,000) (Design and Contingencies - $140,000)
(11) S.R.0019, Johnston Run Bridge over Johnston Run, Springfield Township, Bridge Replacement420,000
(Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(12) S.R.0058, Bridge over Moury Run, Hempfield Township, Bridge Rehabilitation230,000
(Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(13) S.R.0158, Bridge over I-80, East Lackawannock Township, Bridge Rehabilitation1,980,000
(Base Construction Allocation - $1,810,000) (Land Allocation - $10,000) (Design and Contingencies - $160,000)
(14) S.R.0318, Bridge over Little Neshannock Creek, East Lackawannock Township, Bridge Replacement500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(15) S.R.0358, Hadley Road Bridge over I-79, New Vernon Township, Bridge Rehabilitation2,100,000
(Base Construction Allocation - $1,890,000) (Land Allocation - $30,000) (Design and Contingencies - $180,000)
(16) S.R.0718, State Street Bridge, City of Sharon, Bridge Deck Replacement430,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $30,000)
(17) S.R.0178, State Street Bridge over Shenango River, City of Sharon, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $40,000)
(18) S.R.0718, Bridge over Towel Works Run, City of Hermitage, Bridge Replacement310,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(19) S.R.1009, Lake Wilhelm Road Bridge over Lake Wilhelm, New Vernon Township, Bridge Rehabilitation1,350,000
(Base Construction Allocation - $1,220,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000)
(20) S.R.1014, Georgetown Road Bridge over I-79, Deer Creek Township, Bridge Rehabilitation190,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(21) S.R.2002, Leesburg Station Road Bridge over Hunter Run, Springfield Township, Bridge Rehabilitation500,000
(Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(22) S.R.2014, Scrubgrass Bridge No.1 over Otter Creek, Mercer Borough, Bridge Rehabilitation550,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(23) S.R.2014, Scrubgrass Bridge No.2 over Cool Spring, Findley Township, Bridge Replacement500,000
(Base Construction Allocation - $420,000) (Land Allocation - $30,000) (Design and Contingencies - $50,000)
(24) S.R.3004, Broadway Bridge over Branch of Shenango River, City of Hermitage, Bridge Rehabilitation150,000
(Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(25) S.R.3009, Greenfield Road Bridge over Little Neshannock Creek, New Vernon Township, Bridge Rehabilitation500,000
(Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(26) S.R.3013, Orchard Road Bridge over I-80, Lackawannock Township, Bridge Rehabilitation1,300,000
(Base Construction Allocation - $1,160,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000)
(27) S.R.3019, Towel Works Road Bridge over Towel Works Run, City of Hermitage, Bridge Rehabilitation270,000
(Base Construction Allocation - $230,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(28) S.R.3022, Rutledge Road Bridge No.1 over Booth Run, South Pymatuning Township, Bridge Rehabilitation230,000
(Base Construction Allocation - $190,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(29) S.R.3022, Rutledge Road Bridge No.2 over Lackawanna Creek, Jefferson Township, Bridge Replacement320,000
(Base Construction Allocation - $260,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(30) S.R.3022, Rutledge Road Bridge No.3 over Lackawanna Creek, Jefferson Township, Bridge Replacement240,000
(Base Construction Allocation - $180,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(31) S.R.4019, Cherry Hill Bridge over Little Shenango River, Sugar Grove Township, Bridge Replacement400,000
(Base Construction Allocation - $330,000) (Land Allocation - $30,000) (Design and Contingencies - $40,000)
(32) S.R.4024, Cochran Road Bridge over Lenango Creek, Delaware Township, Bridge Replacement300,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(33) S.R.3007 over Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation290,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(34) S.R.2017 over Cool Spring Creek, Fairview Township, Bridge Replacement510,000
(Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(35) S.R.3007 over Tributary of Little Neshannock Creek, Lackawannock Township, Bridge Replacement380,000
(Base Construction Allocation - $290,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000)
(36) S.R.0258 over Black Run, Liberty Township, Bridge Replacement410,000
(Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(37) S.R.2007 over Wolf Creek, Pine Township, Bridge Rehabilitation150,000
(Base Construction Allocation - $135,000) (Design and Contingencies - $15,000)
(38) S.R.4021 over Buff Run, Sugar Grove Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(39) S.R.0018 over Shenango River, Greenville Borough, Bridge Replacement1,350,000
(Base Construction Allocation - $1,200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(40) S.R.4006, Porter Bridge over Shenango River, West Salem Township, Bridge Replacement1,020,000
(Base Construction Allocation - $900,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000)
(41) S.R.4006, Williamson Crossing Bridge over Little Shenango River, Hempfield Township, Bridge Replacement1,090,000
(Base Construction Allocation - $970,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000)
(42) S.R.1015, New Lebanon Road Bridge over Deer Creek, French Creek Township, Bridge Replacement920,000
(Base Construction Allocation - $840,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(43) S.R.1015, New Lebanon Road Bridge over French Creek, French Creek Township, Bridge Replacement2,020,000
(Base Construction Allocation - $1,850,000) (Land Allocation - $30,000) (Design and Contingencies - $140,000)
(44) S.R.2004, Milburn Run Bridge over Neshannock Creek, Springfield Township, Bridge Replacement670,000
(Base Construction Allocation - $570,000) (Land Allocation - $60,000) (Design and Contingencies - $40,000)

Section 48. Mifflin County.

(a) Local Bridges
(1) Armagh Township, T-465 over Treaster Run, Bridge Replacement440,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(2) Decatur Township, T-321 over Meadow Creek, Bridge Replacement568,000
(Base Construction Allocation - $524,000) (Land Allocation - $12,000) (Design and Contingencies - $32,000)
(3) Decatur Township, T-323 over Jacks Creek, Bridge Replacement253,000
(Base Construction Allocation - $220,000) (Land Allocation - $9,000) (Design and Contingencies - $24,000)
(4) Decatur Township, T-315 over Jacks Creek, Bridge Replacement269,000
(Base Construction Allocation - $230,000) (Land Allocation - $11,000) (Design and Contingencies - $28,000)
(5) Derry Township, T-480 over Kish Creek, Bridge Replacement450,000
(Base Construction Allocation - $400,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(6) City of Lewistown, T-403 over Kish Creek, Bridge Replacement461,000
(Base Construction Allocation - $413,000) (Land Allocation - $18,000) (Design and Contingencies - $30,000)
(7) Granville Township, T-355 Bridge, Bridge Replacement300,000
(Base Construction Allocation - $245,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000)
(b) State Bridges
(1) S.R.3021, Newton Hamilton Bridge over Juniata River, Newton Hamilton Borough, Bridge Replacement5,250,000
(Base Construction Allocation - $4,750,000) (Land Allocation - $200,000) (Design and Contingencies - $300,000)
(2) S.R.0522, Bridge over Branch of Jacks Creek, Decatur Township, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(3) S.R.2007, Bridge over Kishacoquillas Creek, Derry Township, Bridge Replacement925,000
(Base Construction Allocation - $700,000) (Land Allocation - $100,000) (Design and Contingencies - $125,000)
(4) S.R.1002, Honey Creek Bridge over Honey Creek, Village of Shrader, Armagh Township, Bridge Replacement840,000
(Base Construction Allocation - $800,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)

Section 49. Monroe County.

(a) Local Bridges
(1) Tunkhannock Township, T-629, over Tunkhannock Creek, Bridge Replacement190,000
(Base Construction Allocation - $140,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(2) Tunkhannock Township, T-633, Bridge over Tunkhannock Creek, Bridge Replacement139,000
(Base Construction Allocation - $121,000) (Land Allocation - $6,000) (Design and Contingencies - $12,000)
(3) Stroud Township, T-410, Bridge over Cherry Creek, Bridge Replacement127,000
(Base Construction Allocation - $110,000) (Land Allocation - $6,000) (Design and Contingencies - $11,000)
(4) Hamilton Township, T-202, Lake Circle Bridge, Bridge Replacement126,000
(Base Construction Allocation - $101,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000)
(5) Hamilton Township, T-414, Bridge No.7, Bridge Replacement522,000
(Base Construction Allocation - $457,000) (Land Allocation - $20,000) (Design and Contingencies - $45,000)
(6) Jackson Township, T-486, Trout Lake Bridge, Bridge Replacement184,000
(Base Construction Allocation - $160,000) (Land Allocation - $8,000) (Design and Contingencies - $16,000)
(7) Stroud Township, T-420, Bridge over Cherry Creek, Bridge Replacement169,000
(Base Construction Allocation - $143,000) (Land Allocation - $6,000) (Design and Contingencies - $20,000)
(8) Smithfield Township, T-539, Bridge over Marshalls Creek, Bridge Replacement298,000
(Base Construction Allocation - $267,000) (Land Allocation - $5,000) (Design and Contingencies - $26,000)
(9) Hamilton Township, T-233, County Bridge No.9 over McMichael Creek, Bridge Replacement515,000
(Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $45,000)
(10) Hamilton Township, T-231, County Bridge No.8 over Appenzell Creek, Bridge Replacement400,000
(Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(b) State Bridges
(1) S.R.0402 at Ressica Falls, Middle Smithfield Township, Bridge Replacement1,426,000
(Base Construction Allocation - $1,060,000) (Land Allocation - $60,000) (Design and Contingencies - $306,000)
(2) S.R.0033 over S.R.0209, Hamilton Township, Bridge Replacement195,000
(Base Construction Allocation - $177,000) (Design and Contingencies - $18,000)
(3) S.R.2012, Hamilton East Road over McMichael Creek, Hamilton Township, Bridge Replacement140,000
(Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(4) S.R.2004 over S.R.0033, Hamilton Township, Bridge Replacement335,000
(Base Construction Allocation - $304,000) (Design and Contingencies - $31,000)
(5) S.R.2003 over Cherry Creek, Hamilton Township, Bridge Replacement137,000
(Base Construction Allocation - $79,000) (Land Allocation - $5,000) (Design and Contingencies - $53,000)
(6) S.R.3018 over Kettle Creek II, Hamilton Township, Bridge Replacement68,000
(Base Construction Allocation - $59,000) (Land Allocation - $3,000) (Design and Contingencies - $6,000)
(7) S.R.3018 over Kettle Creek I, Hamilton Township, Bridge Replacement80,000
(Base Construction Allocation - $70,000) (Land Allocation - $3,000) (Design and Contingencies - $7,000)
(8) S.R.2017 over I-80, East Stroudsburg Borough, Bridge Replacement381,000
(Base Construction Allocation - $317,000) (Design and Contingencies - $64,000)
(9) S.R.0080, Water Gap Bridge over Cherry Creek, Delaware Water Gap, Bridge Replacement795,000
(Base Construction Allocation - $723,000) (Design and Contingencies - $72,000)
(10) S.R.0447 at Leavetts Branch, Barrett Township, Bridge Replacement255,000
(Base Construction Allocation - $175,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(11) S.R.0611 at Erie/Lackawanna Railroad, Coolbaugh Township, Bridge Replacement608,000
(Base Construction Allocation - $521,000) (Land Allocation - $10,000) (Design and Contingencies - $77,000)
(12) S.R.0423 over Tobyhanna Creek, Coolbaugh Township, Bridge Replacement194,000
(Base Construction Allocation - $163,000) (Design and Contingencies - $31,000)
(13) S.R.2030 over I-80, Delaware Water Gap, Bridge Replacement450,000
(Base Construction Allocation - $409,000) (Design and Contingencies - $41,000)
(14) S.R.1014 over Wallenpaupack Creek, Coolbaugh Township, Bridge Replacement140,000
(Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(15) S.R.4007 over Steamtown Railroad, Mount Pocono Borough, Bridge Replacement820,000
(Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $70,000)
(16) S.R.3022 over McMichaels Creek, Hamilton Township, Bridge Replacement161,000
(Base Construction Allocation - $140,000) (Land Allocation - $7,000) (Design and Contingencies - $14,000)
(17) S.R.4001 at Long Pond, Tunkhannock Township, Bridge Replacement425,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000)
(18) S.R.0940 at Pocono Summit, Tobyhanna Township, Bridge Replacement4,850,000
(Base Construction Allocation - $4,600,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(19) S.R.0940 over Tobyhanna Creek, Tobyhanna Township, Bridge Replacement1,240,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $60,000) (Design and Contingencies - $80,000)
(20) S.R.0191 over McMichaels Creek, Stroudsburg Borough, Bridge Replacement520,000
(Base Construction Allocation - $472,000) (Design and Contingencies - $48,000)
(21) S.R.0191 under Railroad, Pocono Township, Bridge Replacement1,400,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $200,000) (Design and Contingencies - $200,000)
(22) S.R.0209 over I-80, Smithfield Township, Bridge Replacement368,000
(Base Construction Allocation - $334,000) (Design and Contingencies - $34,000)
(23) S.R.8024 at I-80 Ramp, Smithfield Township, Bridge Replacement759,000
(Base Construction Allocation - $690,000) (Design and Contingencies - $69,000)
(24) S.R.1005 over Buffalo Run, Stroud Township, Bridge Replacement103,000
(Base Construction Allocation - $90,000) (Land Allocation - $4,000) (Design and Contingencies - $9,000)
(25) S.R.0191 over Broadhead Creek, Stroud Township, Bridge Replacement843,000
(Base Construction Allocation - $648,000) (Land Allocation - $65,000) (Design and Contingencies - $130,000)
(26) S.R.3022 over McMichael Creek, Hamilton Township, Bridge Replacement161,000
(Base Construction Allocation - $140,000) (Land Allocation - $7,000) (Design and Contingencies - $14,000)
(27) S.R.0611, 7th Street Bridge over I-80, Borough of Stroudsburg, Bridge Replacement5,000,000
(Base Construction Allocation - $4,500,000) (Design and Contingencies - $500,000)
(28) S.R.0191, Broad Street Bridge over I-80, Borough of Stroudsburg, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(29) S.R.0191, Bridge over McMichaels Creek, Borough of Stroudsburg, Bridge Rehabilitation520,000
(Base Construction Allocation - $472,000) (Design and Contingencies - $48,000)

Section 50. Montgomery County.

(a) Local Bridges
(1) Cheltenham Township, Mill Road Bridge over Tookany Creek between Church Road and Harrison Avenue, Elkins Park, Bridge Replacement360,000
(Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $45,000)
(2) Cheltenham Township, Forest Avenue Bridge over Tookany Creek at Intersection of Forest Avenue and Shoemaker Road, Elkins Park, Bridge Replacement285,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $35,000)
(3) Cheltenham Township, Serpentine Lane Bridge over Rock Lane Creek between Rock Lane and Ivy Lane, Elkins Park, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $30,000)
(4) Cheltenham Township, Tookany Creek Parkway Bridge over Tookany Creek 500 Feet East of New Second Street, Elkins Park, Bridge Replacement345,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $45,000)
(5) Cheltenham Township, Ashmead Road Bridge over Tookany Creek 100 Feet South of Tookany Creek Parkway, Cheltenham, Bridge Replacement400,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $50,000)
(6) Trappe Borough and Perkiomen Township, Betcher Road Bridge over Branch of School House Run, Bridge Replacement73,000
(Base Construction Allocation - $66,000) (Design and Contingencies - $7,000)
(7) Trappe Borough, West First Avenue Bridge over Donny Brook Creek, Bridge Replacement49,000
(Base Construction Allocation - $44,000) (Design and Contingencies - $5,000)
(8) Abington Township, Revelation Road, Bridge Replacement600,000
(Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(9) Abington Township, Osceola Avenue, Bridge Replacement300,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(10) Abington Township, Cadwalader Avenue, Bridge Replacement300,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(11) Abington Township, Tulpehocken Avenue, Bridge Replacement300,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(12) Abington Township, Rydal Road at Cloverly Lane, Bridge Replacement300,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(13) Abington Township, Meadowbrook Road between Stockton Road and Valley Road, Bridge Replacement425,000
(Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000)
(14) Abington Township, Stockton Road at Meadowbrook Road, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(15) Abington Township, Paul Brook Lane, Bridge Replacement350,000
(Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)
(16) Abington Township, Johnston Avenue at Radcliffe Avenue, Bridge Replacement550,000
(Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(17) Abington Township, Washington Lane, 300 Feet South of Frog Hollow Road, Bridge Replacement2,700,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $200,000) (Design and Contingencies - $500,000)
(18) Abington Township, L.R.46115, Station 50-98, North Hills Avenue, Bridge Replacement340,000
(Base Construction Allocation - $200,000) (Land Allocation - $100,000) (Design and Contingencies - $40,000)
(19) Plymouth Township, Belvoir Road Bridge over Saw Mill Creek, Bridge Replacement445,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $45,000)
(20) Lower Pottsgrove Township, South Pleasantview Road at Sanatoga Road, Bridge Rehabilitation141,000
(Base Construction Allocation - $124,000) (Land Allocation - $5,000) (Design and Contingencies - $12,000)
(21) Lower Pottsgrove Township, Snell Road at Sanatoga Road, Bridge Rehabilitation97,000
(Base Construction Allocation - $86,000) (Land Allocation - $2,000) (Design and Contingencies - $9,000)
(22) Lower Pottsgrove Township, Shaffer Road, 0.5 Mile North of Pruss Hill Road, Bridge Rehabilitation44,000
(Base Construction Allocation - $38,000) (Land Allocation - $2,000) (Design and Contingencies - $4,000)
(23) Lower Pottsgrove Township, Pruss Hill Road, 1 Mile East of Pleasantview Road, Bridge Rehabilitation79,000
(Base Construction Allocation - $70,000) (Land Allocation - $2,000) (Design and Contingencies - $7,000)
(24) Lower Pottsgrove Township, Sanatoga Station Road at Porter Road, Bridge Rehabilitation48,000
(Base Construction Allocation - $42,000) (Land Allocation - $2,000) (Design and Contingencies - $4,000)
(25) Lower Pottsgrove Township, Adam Street, 0.25 Mile South of Buchert Road, Bridge Rehabilitation111,000
(Base Construction Allocation - $96,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(26) Upper Frederick Township, T-467, Faust Road, Bridge over Goshenhoppen Creek, Bridge Replacement284,000
(Base Construction Allocation - $177,000) (Land Allocation - $10,000) (Design and Contingencies - $97,000)
(27) West Norriton Township, Upper Farm Road Bridge over Stony Creek, Bridge Replacement660,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $60,000)
(28) Borough of Norristown, Lower Farm Road Bridge over Stony Creek, Bridge Replacement550,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $50,000)
(29) East Norriton Township, Lower Farm Road Bridge over Stony Creek, Bridge Replacement352,000
(Base Construction Allocation - $320,000) (Design and Contingencies - $32,000)
(30) Borough of Collegeville and Lower Providence Township, Germantown Pike Bridge over Perkiomen Creek, Bridge Replacement6,500,000
(Base Construction Allocation - $6,000,000) (Design and Contingencies - $500,000)
(31) New Hanover Township, Ludwig Road, County Bridge No.170 over Branch of Middle Creek, Bridge Replacement358,000
(Base Construction Allocation - $350,000) (Design and Contingencies - $8,000)
(32) Upper Providence Township, Arcola Road, County Bridge No.135 over Perkiomen Creek, Bridge Replacement1,000,000
(Base Construction Allocation - $900,000) (Design and Contingencies - $100,000)
(33) Borough of Hatfield, Chestnut Street Bridge over West Branch of Neshaminy Creek, Bridge Replacement105,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $5,000)
(34) Lower Salford Township, T-423, Alderfer Road Bridge over West Branch of Skippack Creek, Bridge Replacement340,000
(Base Construction Allocation - $280,000) (Design and Contingencies - $60,000)
(35) Lower Salford Township, T-419, Quarry Road Bridge over West Branch of Skippack Creek, Bridge Replacement484,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $84,000)
(36) Lower Salford Township, T-419, Stover Road Bridge over West Branch of Skippack Creek, Bridge Replacement305,000
(Base Construction Allocation - $250,000) (Design and Contingencies - $55,000)
(37) Borough of Pottstown, Franklin Street Bridge over Conrail, Bridge Replacement338,000
(Base Construction Allocation - $171,000) (Design and Contingencies - $167,000)
(38) Borough of Pottstown, Washington Street Bridge over Conrail, Bridge Replacement261,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $111,000)
(39) Upper Frederick Township, T-467, Faust Road Bridge over Goshenhopper Creek, Bridge Replacement284,000
(Base Construction Allocation - $177,000) (Land Allocation - $10,000) (Design and Contingencies - $97,000)
(40) Cheltenham Township, Mill Road over Tookany Creek South of Church Road, Bridge Rehabilitation13,000
(Base Construction Allocation - $13,000)
(41) Cheltenham Township, Tookany Creek Parkway East of New Second Street, Bridge Rehabilitation39,000
(Base Construction Allocation - $39,000)
(42) Cheltenham Township, Harrison East of Mill, Bridge Rehabilitation14,000
(Base Construction Allocation - $14,000)
(43) Cheltenham Township, Levick East of Tookany Creek Parkway, Bridge Rehabilitation28,000
(Base Construction Allocation - $28,000)
(44) Cheltenham Township, Tookany Creek Parkway, East of Jenkinstown Road, Bridge Rehabilitation25,000
(Base Construction Allocation - $25,000)
(45) Cheltenham Township, Glenside Avenue East of Rices Mill Road, Bridge Replacement252,000
(Base Construction Allocation - $252,000)
(b) State Bridges
(1) S.R.3051, Old Betzwood Bridge over Schuylkill River, West Norriton and Upper Merion Townships, Bridge Replacement5,500,000
(Base Construction Allocation - $4,800,000) (Land Allocation - $150,000) (Design and Contingencies - $550,000)
(2) S.R.4040, Gilbertsville Road Bridge over Branch of Minister Creek, Douglass Township, Bridge Replacement215,000
(Base Construction Allocation - $175,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(3) S.R.3020, Danne Hower Bridge over Schuylkill River, Upper Merion and Norristown, Bridge Deck Rehabilitation11,000,000
(Base Construction Allocation - $10,450,000) (Design and Contingencies - $550,000)
(4) S.R.0100, Pa.100 South of Pa.724 to Berks County Line, 11 bridges approximately, Douglass, Upper Pottsgrove, Pottstown and North Coventry Townships, Bridge Deck Rehabilitation3,800,000
(Base Construction Allocation - $3,610,000) (Design and Contingencies - $190,000)
(5) S.R.0063, Welsh Road Bridge over Pennypack Creek, Lower Moreland Township, Bridge Replacement215,000
(Base Construction Allocation - $175,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(6) S.R.0073, Washington Lane Bridge over SEPTA, Cheltenham Township, Bridge Deck Rehabilitation2,990,000
(Base Construction Allocation - $2,840,000) (Design and Contingencies - $150,000)
(7) S.R.2034, Edgehill Road and York Road, Abington Township, Bridge Deck Rehabilitation250,000
(Base Construction Allocation - $237,000) (Design and Contingencies - $13,000)
(8) S.R.2025, Central Avenue Bridge over Tacony Creek, Cheltenham Township, Bridge Replacement650,000
(Base Construction Allocation - $500,000) (Land Allocation - $75,000) (Design and Contingencies - $75,000)
(9) Meetinghouse Road, Bridge over Branch of Tacony Creek, Abington Township, Bridge Replacement285,000
(Base Construction Allocation - $160,000) (Land Allocation - $100,000) (Design and Contingencies - $25,000)
(10) Mill Road Bridge over Meadowbrook Creek, Abington Township, Bridge Replacement2,100,000
(Base Construction Allocation - $1,500,000) (Land Allocation - $200,000) (Design and Contingencies - $400,000)
(11) S.R.4027, Sanatoga Road at Skytop Road, Lower Pottsgrove Township, Bridge Rehabilitation148,000
(Base Construction Allocation - $130,000) (Land Allocation - $5,000) (Design and Contingencies - $13,000)
(12) S.R.4032, Kepler Road, Lower Pottsgrove Township, Bridge Rehabilitation45,000
(Base Construction Allocation - $36,000) (Land Allocation - $5,000) (Design and Contingencies - $4,000)
(13) S.R.4032, Kepler Road, 0.75 Mile Northeast of East High Street, Lower Pottsgrove Township, Bridge Deck Rehabilitation32,000
(Base Construction Allocation - $28,000) (Land Allocation - $2,000 (Design and Contingencies - $2,000)
(14) S.R.4029, Buchert Road at Kauffman Road, Lower Pottsgrove Township, Bridge Rehabilitation110,000
(Base Construction Allocation - $98,000) (Land Allocation - $2,000 (Design and Contingencies - $10,000)
(15) S.R.4029, Buchert Road at Bahr Road, Lower Pottsgrove Township, Bridge Rehabilitation38,000
(Base Construction Allocation - $30,000) (Land Allocation - $5,000) (Design and Contingencies - $3,000)
(16) S.R.4029, Buchert Road at Kepler Road, Lower Pottsgrove Township, Bridge Replacement225,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000)
(17) S.R.4031, East High Street at Sunnybrook Road, Lower Pottsgrove Township, Bridge Rehabilitation450,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(18) S.R.4031, East High Street at Sanatoga Road, Lower Pottsgrove Township, Bridge Rehabilitation450,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(19) S.R.4036, Armand Hammer Boulevard over Railroad Tracks, Lower Pottsgrove Township, Bridge Rehabilitation93,000
(Base Construction Allocation - $80,000) (Land Allocation - $5,000) (Design and Contingencies - $8,000)
(20) S.R.0309, 13 Bridges from Pa. Turnpike to Springhouse, Upper Dublin and Lower Gwynedd Townships, Bridge Rehabilitations1,230,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $20,000) (Design and Contingencies - $110,000)
(21) S.R.0476, 11 Bridges from Balagamingo to Chemical Road, West Conshohocken Borough and Plymouth Township, Bridge Rehabilitations1,210,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $20,000) (Design and Contingencies - $90,000)
(22) S.R.4015, Second Avenue Bridge over Mingo Creek, Upper Providence Township, Bridge Replacement222,000
(Base Construction Allocation - $121,000) (Land Allocation - $35,000) (Design and Contingencies - $66,000)
(23) Old Welsh Road at Cleveland Avenue, Bridge Replacement300,000
(Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $50,000)

Section 51. Montour County.

(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.3006, Bridge over Branch of Beaver Run, Liberty Township, Bridge Replacement322,000
(Base Construction Allocation - $269,000) (Land Allocation - $30,000) (Design and Contingencies - $23,000)
(2) S.R.0054, Danville - Riverside Bridge over Susquehanna River, Danville Borough, Bridge Rehabilitation1,430,000
(Base Construction Allocation - $1,300,000) (Design and Contingencies - $130,000)
(3) Danville Bridge over Susquehanna River, Danville Borough, Bridge Replacement11,573,000
(Base Construction Allocation - $10,173,000) (Land Allocation - $400,000) (Design and Contingencies - $1,000,000)

Section 52. Northampton County.

(a) Local Bridges
(1) City of Easton, Market Street, Bridge Replacement83,000
(Base Construction Allocation - $72,000) (Design and Contingencies - $11,000)
(2) City of Easton, Church Street, Bridge Replacement28,000
(Base Construction Allocation - $25,000) (Design and Contingencies - $3,000)
(3) Bushkill Township, T-638, Keller Road over Tributary to Bushkill Creek, Bridge Replacement110,000
(Base Construction Allocation - $70,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(4) Plainfield Township, T-629, County Bridge No.207 over Wind Gap Creek, Bridge Replacement150,000
(Base Construction Allocation - $115,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(5) City of Easton, Bushkill Drive over Bushkill Creek, Bridge Replacement530,000
(Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(6) Allen Township, T-465B, Atlas Road over Dry Run Creek, Bridge Replacement145,000
(Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(7) Upper Mount Bethel Township, T-701, County Bridge No.221 over Jacoby Creek, Bridge Replacement145,000
(Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(8) Lower Mount Bethel Township, T-663, County Bridge No.202 over Oughoughton Creek, Bridge Replacement180,000
(Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(9) Moore Township, T-588, County Bridge No.146 over Hokendaqua Creek, Bridge Replacement175,000
(Base Construction Allocation - $135,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(10) Lower Nazareth Township, T-436, County Bridge No.102 over Monocacy Creek, Bridge Replacement300,000
(Base Construction Allocation - $250,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(11) Freemansburg Borough, Church Street Bridge over Conrail, Bridge Replacement190,000
(Base Construction Allocation - $165,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000)
(12) Freemansburg Borough, Market Street Bridge over Conrail, Bridge Replacement190,000
(Base Construction Allocation - $165,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000)
(13) City of Bethlehem, Lynn Avenue Bridge between S.R.0412 and East 6th Street, Bridge Replacement1,857,000
(Base Construction Allocation - $1,572,000) (Land Allocation - $15,000) (Design and Contingencies - $270,000)
(14) Borough of Stockertown, County Bridge No.66 over Little Bushkill Creek, Bridge Replacement680,000
(15) Bushkill Township, County Bridge No.184 over Little Martins Creek, Bridge Replacement430,000
(16) Lower Mt. Bethel Township, County Bridge No.185 over Little Martins Creek, Bridge Replacement340,000
(17) Washington Township, County Bridge No.189 over Waltz Creek, Bridge Replacement300,000
(18) Washington Township, County Bridge No.191 over Waltz Creek, Bridge Replacement680,000
(19) Upper Nazareth and Moore Townships, County Bridge No.244 over East Branch of Monocacy Creek, Bridge Replacement340,000
(20) Palmer and Forks Townships, T-499, County Bridge No.62 over Bushkill Creek, Bridge Replacement350,000
(21) Upper Mount Bethel Township, T-806, Bridge over Allegheny Creek, Bridge Replacement505,000
(Base Construction Allocation - $450,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(22) Upper Mount Bethel Township, T-806 over Tributary of Allegheny Creek, Bridge Replacement310,000
(Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(23) Upper Mount Bethel Township, T-807, Bridge over Allegheny Creek, Bridge Replacement400,000
(Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000)
(b) State Bridges
(1) S.R.0611, Front Street over Bushkill Creek, City of Easton, Bridge Replacement1,139,000
(Base Construction Allocation - $1,035,000) (Design and Contingencies - $104,000)
(2) S.R.3020 over East Branch of Monocacy Creek, Upper Nazareth Township, Bridge Replacement227,000
(Base Construction Allocation - $174,000) (Land Allocation - $35,000) (Design and Contingencies - $18,000)
(3) S.R.3020 over Tributary to Monocacy Creek near Georgetown Road, Lower Nazareth Township, Bridge Replacement271,000
(Base Construction Allocation - $208,000) (Land Allocation - $42,000) (Design and Contingencies - $21,000)
(4) S.R.1012 over Bushkill Creek, Bushkill Township, Bridge Replacement222,000
(Base Construction Allocation - $201,000) (Design and Contingencies - $21,000)
(5) S.R.2017 13th Street over S.R.0022, City of Easton Bridge Replacement465,000
(Base Construction Allocation - $422,000) (Design and Contingencies - $43,000)
(6) S.R.4006 Whitetail Deer Drive over West Branch of Monocacy Creek, Moore Township, Bridge Replacement169,000
(Base Construction Allocation - $130,000) (Land Allocation - $26,000) (Design and Contingencies - $13,000)
(7) S.R.0329 over Limestone Quarry, Allen Township, Bridge Replacement464,000
(Base Construction Allocation - $356,000) (Land Allocation - $72,000) (Design and Contingencies - $36,000)
(8) S.R.0329 over Dry Run, Allen Township, Bridge Replacement146,000
(Base Construction Allocation - $111,000) (Land Allocation - $23,000) (Design and Contingencies - $12,000)
(9) S.R.0329 over Hokendaqua Creek, Northampton Borough, Bridge Replacement812,000
(Base Construction Allocation - $624,000) (Land Allocation - $125,000) (Design and Contingencies - $63,000)
(10) S.R.0022, Bridge over Bushkill Creek, City of Easton, Bridge Rehabilitation674,000
(Base Construction Allocation - $562,000) (Design and Contingencies - $112,000)
(11) S.R.0022, Bridge over T-575, Hanover Township, Bridge Replacement1,000,000
Section 53. Northumberland County.
(a) Local Bridges
(1) West Cameron Township, T-480, County Bridge No.167 over Mahanoy Creek, Bridge Replacement815,000
(Base Construction Allocation - $652,000) (Design and Contingencies - $163,000)
(2) Mount Carmel Borough, North Vine Street Bridge over Shamokin Creek, Bridge Rehabilitation320,000
(Base Construction Allocation - $240,000) (Design and Contingencies - $80,000)
(3) Milton Borough, Brown Avenue Bridge over Limestone Run, Bridge Replacement400,000
(Base Construction Allocation - $320,000) (Design and Contingencies - $80,000)
(4) Milton Borough, Filbert Street Bridge over Limestone Run, Bridge Replacement650,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $150,000)
(b) State Bridges
(1) S.R.3012, Fiddlers Run Bridge over Fiddlers Run, Jackson and Lower Mahanoy Townships Bridge Replacement407,000
(Base Construction Allocation - $326,000) (Land Allocation - $20,000) (Design and Contingencies - $61,000)
(2) S.R.2016, Bridge over Shamokin Creek, Shamokin Township, Bridge Replacement789,000
(Base Construction Allocation - $631,000) (Land Allocation - $39,000) (Design and Contingencies - $119,000)
(3) S.R.2017, Bridge over Coal Run, Coal Township, Bridge Replacement436,000
(Base Construction Allocation - $349,000) (Land Allocation - $22,000) (Design and Contingencies - $65,000)
(4) S.R.0405, Bridge over Chillisquaque Creek, 0.3 Mile Northwest of Pa.147, West Chillisquaque Township, Bridge Rehabilitation111,000
(Base Construction Allocation - $103,000) (Design and Contingencies - $8,000)
(5) S.R.4007, Bridge over Shamokin Creek, Upper Augusta Township, Bridge Rehabilitation104,000
(Base Construction Allocation - $97,000) (Design and Contingencies - $7,000)
(6) S.R.4009, Bridge over Shamokin Creek, Upper Augusta Township, Bridge Rehabilitation120,000
(Base Construction Allocation - $112,000) (Design and Contingencies - $8,000)
(7) S.R.2016, Bridge over Shamokin Creek, Rapho Township, Bridge Replacement860,000
(Base Construction Allocation - $700,000) (Land Allocation - $40,000) (Design and Contingencies - $120,000)
(8) S.R.2002, Logan's Run Bridge over Logan's Run, Rush Township, Bridge Replacement580,000
(Base Construction Allocation - $460,000) (Land Allocation - $30,000) (Design and Contingencies - $90,000)
(9) S.R.1001, Bridge over Delaware Run, Delaware Township, Bridge Replacement516,000
(Base Construction Allocation - $387,000) (Land Allocation - $52,000) (Design and Contingencies - $77,000)
(10) S.R.4016, Bridge over Tributary of Plum Creek, Rockefeller Township, Bridge Replacement360,000
(Base Construction Allocation - $288,000) (Land Allocation - $18,000) (Design and Contingencies - $54,000)
(11) S.R.1014, Bridge over Watsontown River, Watsontown Borough, Bridge Rehabilitation5,550,000
(Base Construction Allocation - $4,500,000) (Land Allocation - $250,000) (Design and Contingencies - $800,000)
(12) S.R.4004, Gravel Run Bridge over Gravel Run, Rush Township, Bridge Replacement415,000
(Base Construction Allocation - $335,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(13) S.R.3016, Fiddlers Run Bridge over Fiddlers Run, Jordan Township, Bridge Replacement425,000
(Base Construction Allocation - $330,000) (Land Allocation - $20,000) (Design and Contingencies - $75,000)
(14) S.R.3003, Mouse Creek Bridge over Mouse Run, Washington Township, Bridge Replacement363,000
(Base Construction Allocation - $290,000) (Land Allocation - $18,000) (Design and Contingencies - $55,000)
(15) S.R.3010, Schwaben Creek Bridge over Schwaben Creek, Washington Township, Bridge Replacement985,000
(Base Construction Allocation - $785,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(16) S.R.1025, Bridge over Chillisquaque Creek, East Chillisquaque Township, Bridge Replacement880,000
(Base Construction Allocation - $705,000) (Land Allocation - $45,000) (Design and Contingencies - $130,000)
(17) S.R.0405, Bridge over Muddy Run, Turbot Township, Bridge Replacement420,000
(Base Construction Allocation - $336,000) (Land Allocation - $21,000) (Design and Contingencies - $63,000)
(18) S.R.1003, Bridge over Dry Run, Delaware Township, Bridge Replacement446,000
(Base Construction Allocation - $357,000) (Land Allocation - $22,000) (Design and Contingencies - $67,000)
(19) S.R.4005, Bridge over Tributary of Shamokin Creek, Snydertown Borough, Bridge Replacement342,000
(Base Construction Allocation - $275,000) (Land Allocation - $17,000) (Design and Contingencies - $50,000)
(20) S.R.1007, Bridge over Warrior's Run Creek, McEwensville Borough, Bridge Replacement1,040,000
(Base Construction Allocation - $840,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000)
(21) S.R.3001, Mahanoy Creek Bridge over Mahanoy Creek, Jackson Township, Bridge Replacement1,357,000
(Base Construction Allocation - $1,086,000) (Land Allocation - $68,000) (Design and Contingencies - $203,000)
(22) S.R.2001, Bridge over Little Roaring Creek, Rush Township, Bridge Replacement415,000
(Base Construction Allocation - $335,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(23) S.R.0405, Bridge over T-405 and Conrail, West Chillisquaque Township, Bridge Replacement2,530,000
(Base Construction Allocation - $2,025,000) (Land Allocation - $125,000) (Design and Contingencies - $380,000)
(24) S.R.2016, Bridge over Millers Run, Ralpho Township, Bridge Replacement415,000
(Base Construction Allocation - $335,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(25) S.R.2001, Bridge over Little Roaring Creek, Rush Township, Bridge Replacement455,000
(Base Construction Allocation - $365,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000)
(26) S.R.0255, Bridge over Fiddlers Run, Jackson Township, Bridge Replacement516,000
(Base Construction Allocation - $410,000) (Land Allocation - $26,000) (Design and Contingencies - $80,000)
(27) S.R.0487, Bridge over Tributary of Shamokin Creek, Ralpho Township, Bridge Replacement352,000
(Base Construction Allocation - $281,000) (Land Allocation - $18,000) (Design and Contingencies - $53,000)
(28) S.R.0180 Bridges over S.R.1007, Watsontown interchange, Delaware Township, Bridge Replacement2,860,000
(Base Construction Allocation - $2,600,000) (Design and Contingencies - $260,000)
(29) S.R.4022, Boile Run Bridge over Boile Run, Lower Augusta Township, Bridge Replacement318,000
(Base Construction Allocation - $254,000) (Land Allocation - $16,000) (Design and Contingencies - $48,000)
(30) S.R.0054, Bridge over Conrail Railroad, Mt. Carmel Borough, Bridge Rehabilitation5,207,000
(Base Construction Allocation - $4,166,000) (Land Allocation - $260,000) (Design and Contingencies - $781,000)
(31) S.R.4022, Boyle Run Bridge over Boyle Run, Lower Augusta Township, Bridge Replacement327,000
(Base Construction Allocation - $262,000) (Land Allocation - $16,000) (Design and Contingencies - $49,000)
(32) S.R.0054, Deibler Creek Bridge over Tributary of Deibler Creek, Ralpho Township, Bridge Replacement358,000
(Base Construction Allocation - $286,000) (Land Allocation - $18,000) (Design and Contingencies - $54,000)
(33) S.R.0054, Elysburg Bridge over small stream, Ralpho Township, Bridge Replacement380,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000)
(34) S.R.0054, Bridge over Tributary of Shamokin Creek, Ralpho Township, Bridge Replacement360,000
(Base Construction Allocation - $288,000) (Land Allocation - $18,000) (Design and Contingencies - $54,000)
(35) S.R.0061, Shamokin Creek Bridge over Shamokin Creek, Shamokin Township, Bridge Replacement1,560,000
(Base Construction Allocation - $1,248,000) (Land Allocation - $78,000) (Design and Contingencies - $234,000)
(36) S.R.3006, Mahanoy Creek Bridge over Mahanoy Creek, Jackson Township, Bridge Replacement2,090,000
(Base Construction Allocation - $1,740,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000)
Section 54. Perry County.
(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.50014, Delville Road Bridge over Sherman Creek, Penn Township, Bridge Replacement1,250,000
(Base Construction Allocation - $1,079,000) (Land Allocation - $10,000) (Design and Contingencies - $161,000)
(2) S.R.50014, Delville Road Bridge over Sherman Creek, Penn and Wheatfield Townships, Bridge Replacement1,272,000
(Base Construction Allocation - $1,099,000) (Land Allocation - $8,000) (Design and Contingencies - $165,000)
(3) S.R.3009, Sherman Creek Bridge over Sherman Creek, Southwest Madison Township, Bridge Replacement730,000
(Base Construction Allocation - $610,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000)
(4) S.R.3003, Book's Covered Bridge over Sherman Creek, Jackson Township, Bridge Rehabilitation453,000
(Base Construction Allocation - $432,000) (Land Allocation - $21,000)
Section 55. Philadelphia County.
(a) Local Bridges
(1) City of Philadelphia, 40th Street Bridge over Amtrak, North of Westminster Avenue, Bridge Replacement7,200,000
(Base Construction Allocation - $6,500,000) (Land Allocation - $154,000) (Design and Contingencies - $546,000)
(2) City of Philadelphia, Mascher Street Bridge over Conrail near Gurney Street, New Kensington, Bridge Replacement741,000
(Base Construction Allocation - $480,000) (Land Allocation - $20,000) (Design and Contingencies - $241,000)
(3) City of Philadelphia, Cayuga Street Bridge No.425 over Railroad Tracks, Bridge Replacement300,000
(4) City of Philadelphia, 20th Street and Sedgley Avenue Bridge, Bridge Replacement350,000
(b) State Bridges
(1) S.R.1002, Adams Avenue Bridge over Tacony Creek, City of Philadelphia, Bridge Rehabilitation1,200,000
(Base Construction Allocation - $850,000) (Land Allocation - $100,000) (Design and Contingencies - $250,000)
(2) S.R.4006, City Avenue S.B. over Schuylkill, City of Philadelphia, Bridge Deck Replacement7,950,000
(Base Construction Allocation - $7,500,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000)
(3) S.R.0063, Woodhaven Road: U.S. 1 to I-95, 6 bridges, Philadelphia and Bensalem Townships, Bridge Deck Rehabilitation3,500,000
(Base Construction Allocation - $3,325,000) (Design and Contingencies - $175,000)
(4) S.R.1004, Erie Avenue Bridge over Conrail at 11th Street, City of Philadelphia, Bridge Replacement1,700,000
(Base Construction Allocation - $1,400,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(5) S.R.3014, 4 Bridges on Spring Garden Road from 31st Street to Art Museum, City of Philadelphia, Bridge Rehabilitations660,000
(Base Construction Allocation - $560,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(6) S.R.3037, 7 Bridges on 30th Street from 32nd Street to Schuylkill River, City of Philadelphia, Bridge Rehabilitations1,460,000
(Base Construction Allocation - $1,220,000) (Land Allocation - $100,000) (Design and Contingencies - $140,000)
(7) S.R.4006, City Avenue Bridge Southbound over Schuylkill River, City of Philadelphia, Bridge Deck Replacement4,950,000
(Base Construction Allocation - $4,500,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000)
Section 56. Pike County.
(a) Local Bridges
(1) Milford Borough and Dingman Township, T-426, Mott Street Bridge No.21 over Sawkill Creek, Bridge Replacement1,550,000
(Base Construction Allocation - $1,310,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000)
(2) Shohola Township, T-440, Aumuller Bridge No.24 over Balliard Creek, Bridge Replacement210,000
(Base Construction Allocation - $165,000) (Land Allocation - $20,000) (Design and Contingencies - $25,000)
(3) Porter Township, T-317, Bridge No.5 over Big Bushkill Creek, Bridge Replacement450,000
(Base Construction Allocation - $370,000) (Land Allocation - $25,000) (Design and Contingencies - $55,000)
(4) Porter Township, T-317, Bridge No.4 over Spruce Run, Bridge Replacement135,000
(Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $15,000)
(5) Dingman Township, T-424, Bridge No.5 Rattlesnake Bridge over Rattlesnake Creek, Bridge Replacement210,000
(Base Construction Allocation - $165,000) (Land Allocation - $20,000) (Design and Contingencies - $25,000)
(b) State Bridges
(1) S.R.0006, Bridge over Delaware River, Matamoras Borough, Bridge Replacement330,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $30,000)
(2) S.R.0084, Bridge over Delaware River, Matamoras Borough, Bridge Replacement700,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $100,000)
(3) S.R.0402, Bridge over Blooming Grove Creek, Blooming Grove Township, Bridge Replacement460,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(4) S.R.2001, Bridge over Toms Creek, Lehman Township, Bridge Replacement536,000
(Base Construction Allocation - $470,000) (Land Allocation - $10,000) (Design and Contingencies - $56,000)
(5) S.R.2001, Bridge over Branch of Valentine Brook, Milford Borough, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(6) S.R.0507, Bridge over Tributary to Wallenpaupack Creek, Palmyra Township, Bridge Replacement460,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(7) S.R.0209, Bridge over Sawskill Creek, Milford Borough, Bridge Replacement2,280,000
(Base Construction Allocation - $2,020,000) (Land Allocation - $20,000) (Design and Contingencies - $240,000)
(8) S.R.0006, Shohola Bridge over Shohola Creek, Shohola Township, Bridge Rehabilitation103,000
(Base Construction Allocation - $88,000) (Design and Contingencies - $15,000)
(9) S.R.0006, Bridge over I-84, Milford Township, Bridge Rehabilitation366,000
(Base Construction Allocation - $318,000) (Design and Contingencies - $48,000)
(10) S.R.0006, Delaware Bridge over Delaware River, Matamoras Borough, Bridge Rehabilitation140,000
(Base Construction Allocation - $121,000) (Design and Contingencies - $19,000)
(11) S.R.0084, 28 Bridges on I-84 from Greene Township to Westfall Township, Greene, Palmyra, Blooming Grove, Dingman, Milford and Westfall Townships, Bridge Rehabilitations7,746,000
(Base Construction Allocation - $7,066,000) (Design and Contingencies - $680,000)
(12) S.R.0402, Bridge over I-84, Blooming Grove Township, Bridge Rehabilitation386,000
(Base Construction Allocation - $336,000) (Design and Contingencies - $50,000)
(13) S.R.0434, Bridge over Delaware River, Shohola Township, Bridge Rehabilitation170,000
(Base Construction Allocation - $148,000) (Design and Contingencies - $22,000)
(14) S.R.0590, Lackawaxen Bridge over Lackawaxen River, Lackawaxen Township, Bridge Rehabilitation689,000
(Base Construction Allocation - $599,000) (Design and Contingencies - $90,000)
(15) S.R.1003, Lackawaxen Bridge over Lackawaxen River, Lackawaxen Township, Bridge Rehabilitation171,000
(Base Construction Allocation - $148,000) (Design and Contingencies - $23,000)
(16) S.R.1005, Shohola Bridge over Shohola Creek, Shohola Township, Bridge Rehabilitation204,000
(Base Construction Allocation - $177,000) (Design and Contingencies - $27,000)
(17) S.R.1006, Shohola Bridge over Shohola Creek, Shohola Township, Bridge Rehabilitation156,000
(Base Construction Allocation - $135,000) (Design and Contingencies - $21,000)
(18) S.R.2009, Bridge over I-84, Dingman Township, Bridge Rehabilitation171,000
(Base Construction Allocation - $148,000) (Design and Contingencies - $23,000)
Section 57. Potter County.
(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.0044, Kettle Creek Bridge over Kettle Creek, Stewardson Township, Bridge Replacement1,150,000
(Base Construction Allocation - $900,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)
(2) S.R.0044, Bridge over Kettle Creek, Stewardson Township, Bridge Replacement1,150,000
(Base Construction Allocation - $900,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)
(3) S.R.0006, Bridge over Allegheny River, Coudersport Borough, Bridge Replacement1,500,000
(Base Construction Allocation - $1,250,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000)
(4) S.R.0044, Bridge over Sharon Creek, Sharon Township, Bridge Replacement800,000
(Base Construction Allocation - $600,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(5) S.R.0244, Bridge over Ellisburg Creek, Genesee Township, Bridge Replacement650,000
(Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(6) S.R.1010, Bridge over Genesee River, Genesee Township, Bridge Replacement1,600,000
(Base Construction Allocation - $1,250,000) (Land Allocation - $150,000) (Design and Contingencies - $200,000)
(7) S.R.1011, Bridge No.2 over Genesee River, Genesee Township, Bridge Replacement850,000
(Base Construction Allocation - $650,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(8) S.R.1020, Bridge over West Branch of Pine Creek, Galeton Borough, Bridge Replacement1,525,000
(Base Construction Allocation - $1,250,000) (Land Allocation - $100,000) (Design and Contingencies - $175,000)
(9) S.R.1024, Bridge over Pine Creek, Ulysses Township, Bridge Replacement450,000
(Base Construction Allocation - $250,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(10) S.R.1024, Bridge over Genesee Fork of Pine Creek, Ulysses Township, Bridge Replacement1,300,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000)
(11) S.R.4003, Bridge over Fishing Creek, Roulette Township, Bridge Replacement950,000
(Base Construction Allocation - $750,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000)
(12) S.R.0872, Little Nelson Run Bridge over Little Nelson Run, Wharton Township, Bridge Replacement138,000
(Base Construction Allocation - $116,000) (Land Allocation - $10,000) (Design and Contingencies - $12,000)
Section 58. Schuylkill County.
(a) Local Bridges
(1) North Union Township, T-455 over Tomhicken Creek, Bridge Replacement178,000
(Base Construction Allocation - $138,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(2) Union Township, T-794 over Little Catawissa Creek, Bridge Replacement180,000
(Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(3) Branch Township, T-564, Diamond Street over West Creek, Bridge Replacement190,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(4) East Brunswick Township, T-757 over Indian Run, Bridge Replacement155,000
(Base Construction Allocation - $115,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(5) Hegins Township, T-388, Wood Lane Bridge over Deep Creek, Bridge Replacement220,000
(Base Construction Allocation - $175,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(6) Barry Township, T-577, County Bridge No.7 over Deep Creek, Bridge Replacement155,000
(Base Construction Allocation - $115,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(7) Porter Township, T-418, County Bridge No.67 over Wisconisco Creek, Bridge Replacement235,000
(Base Construction Allocation - $180,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000)
(8) Pine Grove Township, T-406, County Bridge No.108 over Little Swatara Creek, Bridge Replacement395,000
(Base Construction Allocation - $325,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(9) West Brunswick Township, T-723, Industrial Park Road Bridge over Pine Creek, Bridge Replacement420,000
(Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(10) Hegins Township, T-474, Gap School Road Bridge over Rausch Creek, Bridge Replacement150,000
(Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(11) Hegins Township, T-474, Gap School Road Bridge over Pine Creek, Bridge Replacement185,000
(Base Construction Allocation - $145,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(12) Hubley Township, T-446, County Bridge No.71 over Deep Creek, Bridge Replacement400,000
(Base Construction Allocation - $330,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(13) Girardville Borough, John Street Bridge over Mahanoy Creek, Bridge Replacement245,000
(Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(14) St. Clair Borough, Sherman Street County Bridge No.48 over Mill Creek, Bridge Replacement300,000
(Base Construction Allocation - $240,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(15) Pine Grove Borough, Mill Street County Bridge No.33 over Swatara Creek, Bridge Replacement725,000
(Base Construction Allocation - $630,000) (Land Allocation - $20,000) (Design and Contingencies - $75,000)
(16) St. Clair Borough, Russell Street Bridge over Mill Creek, Bridge Replacement260,000
(Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(17) Gilberton Borough, Railroad Street Bridge over Mahanoy Creek, Bridge Replacement190,000
(Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(18) Gilberton Borough, Bridge Street County Bridge No.78 over Mahanoy Creek, Bridge Replacement245,000
(Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000)
(19) Landingville Borough, Canal Street Bridge over Schuylkill River, Bridge Replacement740,000
(Base Construction Allocation - $640,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(20) Blythe Township, T-770, Ridge Street Bridge over Schuylkill River, Bridge Replacement450,000
(Base Construction Allocation - $380,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(21) North Manheim Township, T-686, Memorial Drive under Abandoned Railroad Line, Bridge Removal295,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $25,000)
(22) Frackville Borough, Spring Street Overpass under Reading Railroad, Bridge Removal72,000
(Base Construction Allocation - $52,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000)
(23) Hegins Township, T-478, Bridge over Pine Creek, Bridge Replacement148,000
(Base Construction Allocation - $129,000) (Land Allocation - $6,000) (Design and Contingencies - $13,000)
(24) Girardville Borough, Ogden Street Bridge, Bridge Replacement339,000
(Base Construction Allocation - $250,000) (Land Allocation - $17,000) (Design and Contingencies - $72,000)
(25) Branch Township, T-564 over Muddy Creek, Bridge Replacement141,000
(Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $36,000)
(26) Eldred Township, T-395 over Little Mahantango, Bridge Replacement228,000
(Base Construction Allocation - $180,000) (Land Allocation - $12,000) (Design and Contingencies - $36,000)
(27) Landingville Borough, T-837 over Schuylkill River, Bridge Replacement1,132,000
(Base Construction Allocation - $912,000) (Land Allocation - $40,000) (Design and Contingencies - $180,000)
(b) State Bridges
(1) S.R.0309, Center Street over Little Schuylkill River, Tamaqua Borough, Bridge Replacement1,253,000
(Base Construction Allocation - $963,000) (Land Allocation - $193,000) (Design and Contingencies - $97,000)
(2) S.R.0061 over Schuylkill River, City of Pottsville, Bridge Replacement329,000
(Base Construction Allocation - $299,000) (Design and Contingencies - $30,000)
(3) S.R.0061 over Railroad near City of Pottsville, Bridge Replacement1,323,000
(Base Construction Allocation - $1,202,000) (Design and Contingencies - $121,000)
(4) S.R.0895 over Bear Creek, Wayne Township, Bridge Replacement169,000
(Base Construction Allocation - $130,000) (Land Allocation - $26,000) (Design and Contingencies - $13,000)
(5) S.R.4042 over West Branch of Schuylkill River, Minersville Borough, Bridge Replacement468,000
(Base Construction Allocation - $360,000) (Land Allocation - $72,000) (Design and Contingencies - $36,000)
(6) S.R.4002 over West Branch of Schuylkill River, Cass Township, Bridge Replacement296,000
(Base Construction Allocation - $269,000) (Design and Contingencies - $27,000)
(7) S.R.0501 over Branch of Little Swatara Creek, Pine Grove Township, Bridge Replacement130,000
(Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $10,000)
(8) S.R.1002, Pottsville Street over Mill Creek, Port Carbon Borough, Bridge Replacement603,000
(Base Construction Allocation - $548,000) (Design and Contingencies - $55,000)
(9) S.R.0209 over a mine shaft near Mechanicsville Borough, Port Carbon Borough, Bridge Replacement48,000
(Base Construction Allocation - $40,000) (Design and Contingencies - $8,000)
(10) S.R.0924, Overpass under Reading Railroad, Frackville Borough, Bridge Removal120,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000)
(11) S.R.2006 over Mahannon Creek, West Brunswick Township, Bridge Removal107,000
(Base Construction Allocation - $92,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
Section 59. Snyder County.
(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.1017, Bridge over Rolling Green Run, Monroe Township, Bridge Replacement395,000
(Base Construction Allocation - $316,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000)
(2) S.R.0011, 4 bridges Northbound and Southbound on the Selinsgrove Bypass, Bridge Rehabilitation958,000
(Base Construction Allocation - $882,000) (Design and Contingencies - $76,000)
(3) S.R.0035, Bridge over Penns Creek, Penn Township, Bridge Rehabilitation165,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $15,000)
(4) S.R.3005, Mahantango Creek Bridge over Mahantango Creek, Perry Township, Bridge Replacement347,000
(Base Construction Allocation - $278,000) (Land Allocation - $17,000) (Design and Contingencies - $52,000)
(5) S.R.2009, Pawling Station Bridge over Railroad, Penn Township, Bridge Replacement244,000
(Base Construction Allocation - $195,000) (Land Allocation - $12,000) (Design and Contingencies - $37,000)
(6) S.R.0522, Middle Creek Bridge over Middle Creek, Franklin Township, Bridge Replacement1,865,000
(Base Construction Allocation - $1,488,000) (Land Allocation - $94,000) (Design and Contingencies - $283,000)
(7) S.R.0522, Wetzel Run Bridge over Wetzel Run, Beaver Township, Bridge Replacement395,000
(Base Construction Allocation - $316,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000)
(8) S.R.0104, Mahantango Creek Bridge over Mahantango Creek, Perry Township, Bridge Replacement453,000
(Base Construction Allocation - $362,000) (Land Allocation - $23,000) (Design and Contingencies - $68,000)
(9) S.R.1003 over Tributary of Penns Creek, Center Township, Bridge Replacement574,000
(Base Construction Allocation - $459,000) (Land Allocation - $29,000) (Design and Contingencies - $86,000)
(10) S.R.0522, Beaver Creek Bridge over Beaver Creek, Spring Township, Bridge Replacement1,058,000
(Base Construction Allocation - $846,000) (Land Allocation - $53,000) (Design and Contingencies - $159,000)
(11) S.R.0552 over Tributary of Middle Creek, Spring Township, Bridge Replacement581,000
(Base Construction Allocation - $465,000) (Land Allocation - $29,000) (Design and Contingencies - $87,000)
(12) S.R.0522 over Tributary of Middle Creek, West Beaver Township, Bridge Replacement756,000
(Base Construction Allocation - $605,000) (Land Allocation - $38,000) (Design and Contingencies - $113,000)
(13) S.R.3005, North Branch of Mahantango Creek, Perry Township, Bridge Replacement395,000
(Base Construction Allocation - $316,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000)
(14) S.R.0035 over Tributary of Middle Creek, Washington Township, Bridge Replacement848,000
(Base Construction Allocation - $670,000) (Land Allocation - $52,000) (Design and Contingencies - $126,000)
Section 60. Somerset County.
(a) Local Bridges
(1) Elk Lick Township, Moser Bridge, Bridge Replacement784,000
(Base Construction Allocation - $719,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000)
(2) Allegheny Township, Brush Creek Bridge, Bridge Replacement331,000
(Base Construction Allocation - $293,000) (Land Allocation - $5,000) (Design and Contingencies - $33,000)
(3) Elk Lick Township, Maust Bridge, Bridge Replacement891,000
(Base Construction Allocation - $819,000) (Land Allocation - $5,000) (Design and Contingencies - $67,000)
(4) Fairhope Township, Pack Saddle Bridge, Bridge Rehabilitation248,000
(Base Construction Allocation - $220,000) (Land Allocation - $5,000) (Design and Contingencies - $23,000)
(5) Southampton Township, Emerick Bridge, Bridge Replacement290,000
(Base Construction Allocation - $255,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(6) Stonycreek Township, Brady Bridge, Bridge Replacement626,000
(Base Construction Allocation - $571,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000)
(7) Northampton Township, Philson Bridge, Bridge Replacement392,000
(Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $37,000)
(8) Somerset Township, Housefeldt Bridge, Bridge Replacement391,000
(Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $36,000)
(b) State Bridges
(1) S.R.0219, Miller Run Bridge No.2, Brothers Valley Township, Bridge Rehabilitation560,000
(Base Construction Allocation - $465,000) (Land Allocation - $25,000) (Design and Contingencies - $70,000)
(2) S.R.2005, Intersection Bridge over Elk Lick Creek, Summit Township, Bridge Replacement558,000
(Base Construction Allocation - $442,000) (Land Allocation - $50,000) (Design and Contingencies - $66,000)
(3) S.R.1004, East Shanksville Bridge over Rhoads Creek, Shanksville Borough, Bridge Replacement992,000
(Base Construction Allocation - $789,000) (Land Allocation - $100,000) (Design and Contingencies - $103,000)
(4) S.R.0281, Southwest Somerset Bridge over West Branch Coxes Creek, Somerset Township, Bridge Replacement678,000
(Base Construction Allocation - $556,000) (Land Allocation - $50,000) (Design and Contingencies - $72,000)
(5) S.R.0031, East Brotherton Bridge over Stonycreek Township, Bridge Replacement762,000
(Base Construction Allocation - $630,000) (Land Allocation - $50,000) (Design and Contingencies - $82,000)
(6) S.R.0219, Miller Run Bridge No.1, Brothers Valley Township, Bridge Rehabilitation560,000
(Base Construction Allocation - $465,000) (Land Allocation - $25,000) (Design and Contingencies - $70,000)
(7) S.R.0031, Kimberly Run Bridge, Somerset Township, Bridge Replacement525,000
(Base Construction Allocation - $435,000) (Land Allocation - $25,000) (Design and Contingencies - $65,000)
(8) S.R.2021, Burkhart Bridge over Shaffers Run, Fairhope Township, Bridge Replacement675,000
(Base Construction Allocation - $553,000) (Land Allocation - $50,000) (Design and Contingencies - $72,000)
(9) S.R.2021, Midway Bridge over Shaffers Run, Fairhope Township, Bridge Replacement560,000
(Base Construction Allocation - $444,000) (Land Allocation - $50,000) (Design and Contingencies - $66,000)
(10) S.R.4041, Krings Bridge over Stonycreek River, Conemaugh Township, Bridge Replacement2,496,000
(Base Construction Allocation - $2,087,000) (Land Allocation - $200,000) (Design and Contingencies - $209,000)
(11) S.R.0219, Swamp Creek Bridge, Summit Township, Bridge Replacement535,000
(Base Construction Allocation - $445,000) (Land Allocation - $25,000) (Design and Contingencies - $65,000)
Section 61. Sullivan County.
(a) Local Bridges
(1) Cherry Township, T-348 over Little Loyalsock Creek, Bridge Replacement364,000
(Base Construction Allocation - $291,000) (Land Allocation - $18,000) (Design and Contingencies - $55,000)
(2) Cherry Township, T-363 over Rock Run, Bridge Replacement212,000
(Base Construction Allocation - $170,000) (Land Allocation - $11,000) (Design and Contingencies - $31,000)
(3) Cherry Township, T-378 over Birch Creek, Bridge Replacement232,000
(Base Construction Allocation - $186,000) (Land Allocation - $12,000) (Design and Contingencies - $34,000)
(4) Cherry Township, T-460, Bridge No.4 over Lick Creek, Bridge Replacement311,000
(Base Construction Allocation - $249,000) (Land Allocation - $16,000) (Design and Contingencies - $46,000)
(5) Cherry Township, T-460, Bridge No.5 over Lick Creek, Bridge Replacement252,000
(Base Construction Allocation - $202,000) (Land Allocation - $13,000) (Design and Contingencies - $37,000)
(6) Cherry Township, T-474 over Little Loyalsock Creek, Bridge Replacement238,000
(Base Construction Allocation - $190,000) (Land Allocation - $12,000) (Design and Contingencies - $36,000)
(b) State Bridges (Reserved)
Section 62. Susquehanna County.
(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.0374 over Tunkhannock Creek, Clifford Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(2) S.R.2021 over Tunkhannock Creek, Lenoxville Borough, Bridge Replacement800,000
(Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000)
(3) S.R.2021 over Tunkhannock Creek, Lenox Township, Bridge Replacement1,470,000
(Base Construction Allocation - $1,300,000) (Land Allocation - $10,000) (Design and Contingencies - $160,000)
(4) S.R.0267 over East Branch of Wyalusing Creek, Rush Township, Bridge Replacement1,250,000
(Base Construction Allocation - $1,107,000) (Land Allocation - $10,000) (Design and Contingencies - $133,000)
(5) S.R.0106 over East Branch of Tunkhannock Creek, Clifford Township, Bridge Replacement1,018,000
(Base Construction Allocation - $900,000) (Land Allocation - $10,000) (Design and Contingencies - $108,000)
(6) S.R.0171 over East Branch of Lackawanna River, Clifford Township, Bridge Replacement2,938,000
(Base Construction Allocation - $2,605,000) (Land Allocation - $20,000) (Design and Contingencies - $313,000)
(7) S.R.0106 over East Branch of Tunkhannock Creek, Clifford Township, Bridge Replacement1,870,000
(Base Construction Allocation - $1,660,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000)
(8) S.R.0374 over Tunkhannock Creek, Lenox Township, Bridge Replacement370,000
(Base Construction Allocation - $320,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(9) S.R.3029 over East Branch of Wyalusing Creek, Jessup Township, Bridge Replacement794,000
(Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $84,000)
(10) S.R.1010 over Lewis Creek, Oakland Township, Bridge Replacement486,000
(Base Construction Allocation - $425,000) (Land Allocation - $10,000) (Design and Contingencies - $51,000)
(11) S.R.0858 over Apolacon Creek, Little Meadows Borough, Bridge Replacement1,197,000
(Base Construction Allocation - $1,060,000) (Land Allocation - $10,000) (Design and Contingencies - $127,000)
(12) S.R.0848 over Branch of Butler Creek, Gibson Township, Bridge Replacement532,000
(Base Construction Allocation - $466,000) (Land Allocation - $10,000) (Design and Contingencies - $56,000)
(13) S.R.2050 over North Branch of Tunkhannock Creek, Clifford Township, Bridge Replacement553,000
(Base Construction Allocation - $485,000) (Land Allocation - $10,000) (Design and Contingencies - $58,000)
(14) S.R.2061 over Meylert Creek, New Milford Township, Bridge Replacement380,000
(Base Construction Allocation - $330,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(15) S.R.3012 over West Branch of Meshoppen Creek, Springville Township, Bridge Replacement676,000
(Base Construction Allocation - $595,000) (Land Allocation - $10,000) (Design and Contingencies - $71,000)
(16) S.R.2096 over Horton Creek, Lathrop Township, Bridge Replacement458,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $48,000)
(17) S.R.0267 over Branch of Choconut Creek, Choconut Township, Bridge Replacement794,000
(Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $84,000)
(18) S.R.0011, Bridge over Salt Lick Creek, New Milford Borough, Bridge Rehabilitation157,000
(Base Construction Allocation - $136,000) (Design and Contingencies - $21,000)
(19) S.R.0081, 15 bridges on I-81 from Lenox Township to Great Bend, Lenox, Harford, North Milford, Great Bend Townships, Bridge Rehabilitation4,053,000
(Base Construction Allocation - $3,703,000) (Design and Contingencies - $350,000)
(20) S.R.0106, Bridge over Tunkhannock Creek, Lenox Township, Bridge Rehabilitation120,000
(Base Construction Allocation - $104,000) (Design and Contingencies - $16,000)
(21) S.R.0171, Bridge over Abandoned Railroad, Lenox Township, Bridge Rehabilitation120,000
(Base Construction Allocation - $104,000) (Design and Contingencies - $16,000)
(22) S.R.0171, Bridge over Lackawanna River, Clifford Township, Bridge Rehabilitation150,000
(Base Construction Allocation - $130,000) (Design and Contingencies - $20,000)
(23) S.R.0171, Bridge over Conrail, Great Bend Township, Bridge Rehabilitation318,000
(Base Construction Allocation - $276,000) (Design and Contingencies - $42,000)
(24) S.R.0367, Bridge over Tuscarora Creek, Auburn Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $113,000) (Design and Contingencies - $17,000)
(25) S.R.0371, Bridge over Lackawanna River, Herrick Township, Bridge Replacement460,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(26) S.R.0706, Bridge over Branch of Wyalusing Creek, Rush Township, Bridge Replacement245,000
(Base Construction Allocation - $210,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(27) S.R.0706, Bridge over Deerlick Creek, Rush Township, Bridge Replacement1,075,000
(Base Construction Allocation - $950,000) (Land Allocation - $10,000) (Design and Contingencies - $115,000)
(28) S.R.1029, Bridge over I-81, Great Bend Township, Bridge Rehabilitation199,000
(Base Construction Allocation - $173,000) (Design and Contingencies - $26,000)
(29) S.R.2021, Bridge over I-81, Lenox Township, Bridge Rehabilitation136,000
(Base Construction Allocation - $118,000) (Design and Contingencies - $18,000)
(30) S.R.2021, Bridge over East Branch of Tunkhannock Creek, Lenox Township, Bridge Rehabilitation123,000
(Base Construction Allocation - $107,000) (Design and Contingencies - $16,000)
(31) S.R.2039, Bridge over Millard Creek, Lenox Township, Bridge Rehabilitation113,000
(Base Construction Allocation - $98,000) (Design and Contingencies - $15,000)
(32) S.R.2040, Bridge over Lackawanna River, Uniondale Borough, Bridge Rehabilitation143,000
(Base Construction Allocation - $124,000) (Design and Contingencies - $19,000)
(33) S.R.3023, Bridge over Meshoppen Creek, Dimock Township, Bridge Rehabilitation135,000
(Base Construction Allocation - $117,000) (Design and Contingencies - $18,000)
(34) S.R.3023, Bridge over East Branch of Wyalusing Creek, Rush Township, Bridge Rehabilitation188,000
(Base Construction Allocation - $163,000) (Design and Contingencies - $25,000)
(35) S.R.3027, Bridge over Wyalusing Creek, Jessup Township, Bridge Rehabilitation137,000
(Base Construction Allocation - $119,000) (Design and Contingencies - $18,000)
(36) S.R.0706, Bridge over Wyalusing Creek, Rush Township, Bridge Replacement245,000
(Base Construction Allocation - $210,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(37) S.R.0706, Bridge over Deerlick Creek, Rush Township, Bridge Replacement1,075,000
(Base Construction Allocation - $950,000) (Land Allocation - $10,000) (Design and Contingencies - $115,000)
(38) S.R.0371, Bridge over Lackawanna River, Herrick Township, Bridge Replacement460,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
Section 63. Tioga County.
(a) Local Bridges
(1) Deerfield Township, T-402, Knox Bridge over Cowanesque River, Bridge Replacement1,415,000
(Base Construction Allocation - $1,305,000) (Land Allocation - $5,000) (Design and Contingencies - $105,000)
(b) State Bridges (Reserved)
Section 64. Union County.
(a) Local Bridges
(1) West Buffalo Township, T-380, School House Bridge over Buffalo Creek, Bridge Replacement779,000
(Base Construction Allocation - $623,000) (Land Allocation - $39,000) (Design and Contingencies - $117,000)
(2) Kelly Township, T-450, County Bridge No.8, Nogle Bridge over Buffalo Creek, Bridge Replacement1,026,000
(Base Construction Allocation - $821,000) (Land Allocation - $51,000) (Design and Contingencies - $154,000)
(3) Mifflinburg Borough, County Bridge No.14, Iddings Bridge over Buffalo Creek, Bridge Replacement493,000
(Base Construction Allocation - $394,000) (Land Allocation - $25,000) (Design and Contingencies - $74,000)
(4) Hartley Township, Trails End Bridge over Penns Creek, Bridge Replacement1,120,000
(Base Construction Allocation - $896,000) (Land Allocation - $56,000) (Design and Contingencies - $168,000)
(5) White Deer Township, Bowersox Bridge over Spruce Run, Bridge Replacement300,000
(Base Construction Allocation - $240,000) (Land Allocation - $15,000) (Design and Contingencies - $45,000)
(6) Limestone Township, Deer Bridge over Sweitzer Run, Bridge Replacement350,000
(Base Construction Allocation - $280,000) (Land Allocation - $15,000) (Design and Contingencies - $55,000)
(7) Lewisburg Borough, University Avenue Brick Masonry Arch, Bridge Rehabilitation16,000
(Base Construction Allocation - $12,000) (Design and Contingencies - $4,000)
(b) State Bridges
(1) S.R.0015, 3 Bridges from New Columbia to White Deer, Bridge Rehabilitations332,000
(Base Construction Allocation - $312,000) (Design and Contingencies - $20,000)
(2) S.R.1010, White Deer Pike Bridge over I-80 near Union-Clinton County Line, Bridge Rehabilitation147,000
(Base Construction Allocation - $133,000) (Design and Contingencies - $14,000)
(3) S.R.3003 over Branch of Buffalo Creek, Lewis Township, Bridge Rehabilitation457,000
(Base Construction Allocation - $366,000) (Land Allocation - $23,000) (Design and Contingencies - $68,000)
(4) S.R.1005 over Conrail Railroad, Kelly Township, Bridge Replacement825,000
(Base Construction Allocation - $660,000) (Land Allocation - $41,000) (Design and Contingencies - $124,000)
(5) S.R.1001, Spruce Run Bridge over Spruce Run, Kelly Township, Bridge Replacement404,000
(Base Construction Allocation - $323,000) (Land Allocation - $20,000) (Design and Contingencies - $61,000)
Section 65. Venango County.
(a) Local Bridges
(1) Cherry Tree Township, T-520 over Prather Creek, Bridge Replacement200,000
(Base Construction Allocation - $167,000) (Land Allocation - $3,000) (Design and Contingencies - $30,000)
(2) Oil Creek Township, T-639 on Coe Road over Pithole Creek, Bridge Replacement112,000
(Base Construction Allocation - $90,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(3) Oakland Township, T-450 over Two Mule Run Tributary, Bridge Replacement154,000
(Base Construction Allocation - $124,000) (Land Allocation - $15,000) (Design and Contingencies - $15,000)
(4) Cherry Tree Township, T-649 over Prather Creek, Bridge Replacement200,000
(Base Construction Allocation - $167,000) (Land Allocation - $3,000) (Design and Contingencies - $30,000)
(5) Rockland Township, T-512, Slab Furnace Railroad over Conrail, Bridge Replacement442,000
(Base Construction Allocation - $384,000) (Land Allocation - $10,000) (Design and Contingencies - $48,000)
(6) Rockland Township, T-582, Conrail Bridge T-582 over Conrail, Bridge Replacement385,000
(Base Construction Allocation - $345,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(7) French Creek Township, T-304 on Bambish Road over Little Sandy Creek, Bridge Replacement196,000
(Base Construction Allocation - $156,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000)
(8) French Creek Township, T-318 on Nagel Road over Little Sandy Creek, Bridge Replacement176,000
(Base Construction Allocation - $140,000) (Land Allocation - $18,000) (Design and Contingencies - $18,000)
(9) French Creek Township, T-334 on Whipporwill Road over Little Sandy Creek, Bridge Replacement161,000
(Base Construction Allocation - $129,000) (Land Allocation - $16,000) (Design and Contingencies - $16,000)
(10) French Creek Township, T-346 on Rainbow Road over Little Sandy Creek, Bridge Replacement175,000
(Base Construction Allocation - $139,000) (Land Allocation - $18,000) (Design and Contingencies - $18,000)
(11) Jackson Township, T-364 over Lake Creek, Bridge Replacement225,000
(Base Construction Allocation - $179,000) (Land Allocation - $23,000) (Design and Contingencies - $23,000)
(12) Jackson Township, T-384 over Sugar Creek Branch, Bridge Replacement119,000
(Base Construction Allocation - $95,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(13) Jackson and Sugarcreek Townships, T-557 over Beatty Run, Bridge Replacement94,000
(Base Construction Allocation - $76,000) (Land Allocation - $9,000) (Design and Contingencies - $9,000)
(14) Plum Township, T-476 on Gifford Road over Prather Creek, Bridge Replacement151,000
(Base Construction Allocation - $121,000) (Land Allocation - $15,000) (Design and Contingencies - $15,000)
(15) Plum Township, T-627 over Sugarcreek Middle Branch, Bridge Replacement329,000
(Base Construction Allocation - $263,000) (Land Allocation - $33,000) (Design and Contingencies - $33,000)
(16) Plum Township, T-647 on Acel Road over Little Sugar Creek, Bridge Replacement105,000
(Base Construction Allocation - $83,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(17) Cooperstown Borough, T-372 on Wollen Mills Road over Lake Creek, Bridge Replacement329,000
(Base Construction Allocation - $263,000) (Land Allocation - $33,000) (Design and Contingencies - $33,000)
(18) Polk Borough, Church Street over Sandy Creek, Bridge Replacement364,000
(Base Construction Allocation - $292,000) (Land Allocation - $36,000) (Design and Contingencies - $36,000)
(19) Polk Borough, McClelland Avenue over Little Sandy Creek, Bridge Replacement402,000
(Base Construction Allocation - $362,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(20) Sugar Creek Borough, T-529 on Martin Hill over Two Mile Run, Bridge Replacement117,000
(Base Construction Allocation - $93,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(21) Rockland Township, T-522, Dotter Bridge, Bridge Replacement300,000
(Base Construction Allocation - $260,000) (Design and Contingencies - $40,000)
(22) Oilcreek Township, T-365, Miller Farm Bridge, Bridge Replacement840,000
(Base Construction Allocation - $774,000) (Land Allocation - $7,000) (Design and Contingencies - $59,000)
(23) French Creek Township, T-339, Whipporwill Road, Bridge Replacement275,000
(Base Construction Allocation - $241,000) (Land Allocation - $6,000) (Design and Contingencies - $28,000)
(24) Clinton Township, T-380, Phipps Road, Bridge Replacement385,000
(Base Construction Allocation - $352,000) (Land Allocation - $6,000) (Design and Contingencies - $27,000)
(b) State Bridges
(1) S.R.3007, Witherup Bridge over Scrubgrass Creek, Clinton Township, Bridge Replacement850,000
(Base Construction Allocation - $665,000) (Land Allocation - $60,000) (Design and Contingencies - $125,000)
(2) S.R.0036 on Col. Drake Highway over Pithole Creek, Allegheny Township, Bridge Replacement900,000
(Base Construction Allocation - $765,000) (Land Allocation - $45,000) (Design and Contingencies - $90,000)
(3) S.R.0008, Bridge over I-80, Barkeyville Borough, Bridge Replacement2,300,000
(Base Construction Allocation - $2,100,000) (Land Allocation - $10,000) (Design and Contingencies - $190,000)
(4) S.R.0036, Bridge over Pithole Creek, Allegheny Township, Bridge Replacement1,000,000
(Base Construction Allocation - $900,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(5) S.R.0208, Mercer Street Bridge over Little Scrubgrass Creek, Clintonville Borough, Bridge Replacement800,000
(Base Construction Allocation - $700,000) (Land Allocation - $30,000) (Design and Contingencies - $70,000)
(6) S.R.0308, Bridge over I-80, Clinton Township, Bridge Rehabilitation1,300,000
(Base Construction Allocation - $1,170,000) (Land Allocation - $20,000) (Design and Contingencies - $110,000)
(7) S.R.2013, Rockland Road Bridge over East Sandy Creek, Cranberry Township, Bridge Replacement1,200,000
(Base Construction Allocation - $1,070,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(8) S.R.2023, MCRA School Road Bridge over Porcupine Creek, President Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(9) S.R.3007, Bridge over I-80, Scrubgrass Township, Bridge Rehabilitation1,700,000
(Base Construction Allocation - $1,560,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000)
(10) S.R.4001, Bridge over Upper Two Mile Run, Sugarcreek Borough, Bridge Rehabilitation130,000
(Base Construction Allocation - $90,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(11) S.R.4007, Bridge over Lake Creek, Jackson Township, Bridge Replacement1,050,000
(Base Construction Allocation - $900,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(12) S.R.0322, Bridge over Patchell Run, Sugar Creek Borough, Bridge Replacement460,000
(Base Construction Allocation - $405,000) (Land Allocation - $20,000) (Design and Contingencies - $35,000)
Section 66. Warren County.
(a) Local Bridges
(1) Pittsfield Township, T-435 over Andrews Run, Bridge Replacement192,000
(Base Construction Allocation - $154,000) (Land Allocation - $19,000) (Design and Contingencies - $19,000)
(2) Freehold Township, T-549 over Stoney Creek, Bridge Replacement274,000
(Base Construction Allocation - $180,000) (Land Allocation - $5,000) (Design and Contingencies - $89,000)
(3) Sheffield Township, T-540 over Two Mile Run, Bridge Replacement318,000
(Base Construction Allocation - $254,000) (Land Allocation - $32,000) (Design and Contingencies - $32,000)
(4) Southwest Township, T-306 on Mt. Hope Road over Pine Creek, Bridge Replacement207,000
(Base Construction Allocation - $165,000) (Land Allocation - $21,000) (Design and Contingencies - $21,000)
(5) Spring Creek Township, T-322 over East Branch of Spring Creek, Bridge Replacement207,000
(Base Construction Allocation - $165,000) (Land Allocation - $21,000) (Design and Contingencies - $21,000)
(6) Southwest Township, T-313 on Swede Road over Pine Creek, Bridge Replacement109,000
(Base Construction Allocation - $87,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(7) Sheffield Township, T-311 over Caldwell Creek, Bridge Replacement210,000
(Base Construction Allocation - $168,000) (Land Allocation - $21,000) (Design and Contingencies - $21,000)
(8) Southwest Township, T-309 over Pine Creek, Bridge Replacement124,000
(Base Construction Allocation - $100,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(9) Spring Creek Township, T-395 over Hosmer Run, Bridge Replacement207,000
(Base Construction Allocation - $165,000) (Land Allocation - $21,000) (Design and Contingencies - $21,000)
(10) Columbus Township, T-340 on Lacy Road over Hare Creek, Bridge Replacement166,000
(Base Construction Allocation - $132,000) (Land Allocation - $17,000) (Design and Contingencies - $17,000)
(11) Columbus Township, T-350 on Alterbottom over Tamarock Swamp Tributary, Bridge Replacement84,000
(Base Construction Allocation - $68,000) (Land Allocation - $8,000) (Design and Contingencies - $8,000)
(12) Spring Creek Township, T-425 over Spring Creek, Bridge Replacement161,000
(Base Construction Allocation - $129,000) (Land Allocation - $16,000) (Design and Contingencies - $16,000)
(13) Brokenstraw Township, T-444 on Irvine Run Road over Irvine Run, Bridge Replacement110,000
(Base Construction Allocation - $88,000) (Land Allocation - $11,000) (Design and Contingencies - $11,000)
(14) Eldred Township, T-355 on Glossville Road over Caldwell Creek, Bridge Replacement119,000
(Base Construction Allocation - $95,000) (Land Allocation - $12,000) (Design and Contingencies - $12,000)
(15) Eldred Township, T-355 on Eureka Road over Caldwell Creek, Bridge Replacement151,000
(Base Construction Allocation - $121,000) (Land Allocation - $15,000) (Design and Contingencies - $15,000)
(16) Columbus Township, T-639 on Stewart Road over Winton Run, Bridge Replacement144,000
(Base Construction Allocation - $116,000) (Land Allocation - $14,000) (Design and Contingencies - $14,000)
(17) Freehold Township, T-406 on Huntley Road over Mill Creek, Bridge Replacement157,000
(Base Construction Allocation - $125,000) (Land Allocation - $16,000) (Design and Contingencies - $16,000)
(18) Sugar Grove Township, T-539 over Stillwater Creek, Bridge Replacement215,000
(Base Construction Allocation - $175,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(19) Sugar Grove Township, T-587 on Creek Road over Saunders Run, Bridge Replacement205,000
(Base Construction Allocation - $165,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(20) Tidioute Borough, First Street over McGuire Run, Bridge Replacement138,000
(Base Construction Allocation - $110,000) (Land Allocation - $14,000) (Design and Contingencies - $14,000)
(21) Tidioute Borough, Grant Street over Tidioute Creek, Bridge Replacement130,000
(Base Construction Allocation - $104,000) (Land Allocation - $13,000) (Design and Contingencies - $13,000)
(22) Sugar Grove Township, T-452 on Deer Run Road over Patchen Run, Bridge Replacement
205,000
(Base Construction Allocation - $165,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(23) Sugar Grove Township, T-579, Patchen Hollow Road Bridge over Patchen Run, Bridge Replacement205,000
(Base Construction Allocation - $165,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(24) Sugar Grove Township, T-458, Jones Hill Road Bridge over Stillwater Creek, Bridge Replacement250,000
(Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(25) Sugar Grove Township, T-539, Stillwater Road Bridge No.8 over Branch of Stillwater Creek, Bridge Replacement205,000
(Base Construction Allocation - $165,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(26) Freehold Township, T-546, Stoney Run Road Bridge over Stoney Run, Bridge Replacement215,000
(Base Construction Allocation - $175,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(27) Conewango Township, T-465, Bridge over Jackson Run, Bridge Replacement235,000
(Base Project Cost - $200,000) (Land Cost - $5,000) (Design and Contingencies - $30,000)
(28) Freehold Township, T-549, Stoney Run Bridge, Bridge Replacement230,000
(Base Construction Allocation - $195,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000)
(29) Youngsville Borough, Mill Street Bridge over Indian Camp Run, Bridge Replacement130,000
(Base Construction Allocation - $115,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000)
(30) Youngsville Borough, Mill Street over Indian Camp Run Creek, Bridge Replacement103,000
(Base Construction Allocation - $87,000) (Design and Contingencies - $16,000)
(b) State Bridges
(1) S.R.0957 over Stillwater Creek, Sugar Grove Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(2) S.R.3005 on Hickory Street over Allegheny Run, Warren Borough, Bridge Rehabilitation2,000,000
(Base Construction Allocation - $1,850,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000)
(3) S.R.3010 over Whitney Run, Spring Creek Township, Bridge Replacement440,000
(Base Construction Allocation - $390,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(4) S.R.0127 over Gordon Run, Triumph Township, Bridge Replacement300,000
(Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(5) S.R.0027 over Hosmer Creek, Pittsfield Township, Bridge Replacement560,000
(Base Construction Allocation - $480,000) (Land Allocation - $30,000) (Design and Contingencies - $50,000)
(6) S.R.3010 over Brokenstraw Creek, Spring Creek Township, Bridge Replacement1,450,000
(Base Construction Allocation - $1,200,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000)
(7) S.R.3014 on Cole Hill Road over Brokenstraw Creek, Pittsfield Township, Bridge Replacement600,000
(Base Construction Allocation - $520,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(8) S.R.3022 over Irvine Run, Brokenstraw Township, Bridge Replacement630,000
(Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(9) S.R.0059, T.R.59, Devils Elbow Bridge over Jakes Run, Mead Township, Bridge Rehabilitation2,000,000
(Base Construction Allocation - $1,830,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000)
(10) S.R.0069 on Jackson Road over Jackson Run, Conewango Township, Bridge Replacement330,000
(Base Construction Allocation - $281,000) (Land Allocation - $17,000) (Design and Contingencies - $32,000)
(11) S.R.0069 on Jackson Road over Jackson Run, Conewango Township, Bridge Replacement320,000
(Base Construction Allocation - $272,000) (Land Allocation - $16,000) (Design and Contingencies - $32,000)
(12) S.R.0958 over Little Brokenstraw Creek, Freehold Township, Bridge Replacement240,000
(Base Construction Allocation - $204,000) (Land Allocation - $12,000) (Design and Contingencies - $24,000)
(13) S.R.2010, Brown Run Road over Browns Run, Mead Township, Bridge Replacement320,000
(Base Construction Allocation - $272,000) (Land Allocation - $16,000) (Design and Contingencies - $32,000)
(14) S.R.0006 in Village of Saybrook over Four Mile Run, Sheffield Township, Bridge Replacement451,000
(Base Construction Allocation - $383,000) (Land Allocation - $23,000) (Design and Contingencies - $45,000)
(15) S.R.0069, Bridge over Jackson Run, Conewango Township, Bridge Replacement500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(16) S.R.0069, Bridge over Stillwater Creek, Sugargrove Borough, Bridge Replacement600,000
(Base Construction Allocation - $530,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(17) S.R.0069, Bridge over Jackson Run, Conewango Township, Bridge Replacement500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(18) S.R.0426, Bridge over Brokenstraw Creek, Columbus Township, Bridge Rehabilitation1,100,000
(Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(19) S.R.0666, Bridge over Tionesta Creek, Sheffield Township, Bridge Replacement1,800,000
(Base Construction Allocation - $1,620,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000)
(20) S.R.1001, Bridge over Jackson Run, Farmington Township, Bridge Replacement500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(21) S.R.1006, Bridge over Hemlock Run, Glade Township, Bridge Replacement500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(22) S.R.1008, Bridge over Conewango Creek, Conewango Township, Bridge Replacement500,000
(Base Construction Allocation - $440,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(23) S.R.2006, Chapman Dam Road Bridge over Elkhorn Run, Pleasant Township, Bridge Rehabilitation150,000
(Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(24) S.R.3001, Oil Creek Road Bridge over East Branch of Spring Creek, Spring Creek Township, Bridge Rehabilitation140,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(25) S.R.3002, McGraw Road Bridge over Pine Creek, Southwest Township, Bridge Rehabilitation120,000
(Base Construction Allocation - $80,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(26) S.R.3005, Pleasant Road Bridge over Still Run, Pleasant Township, Bridge Rehabilitation100,000
(Base Construction Allocation - $70,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(27) S.R.4001, Warner Farm Road Bridge over Hare Creek, Columbus Township, Bridge Replacement520,000
(Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
Section 67. Washington County.
(a) Local Bridges
(1) Cecil Township, Segment 0130 Offset 2811, Bridge Replacement250,000
(Base Construction Allocation - $250,000)
(2) Cecil Township, Segment 0080 Offset 1384, Bridge Replacement60,000
(Base Construction Allocation - $60,000)
(3) Cross Creek Township, Segment 0020 Offset 0027, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(4) Canonsburg Borough, South Central Avenue over Branch of Chartiers Creek, Bridge Replacement1,000,000
(Base Construction Allocation - $1,000,000)
(5) Donegal Township, Segment 0080 Offset 0039, Bridge Replacement325,000
(Base Construction Allocation - $325,000)
(6) Cross Creek Township, T-433, Parker Road Bridge over Middle Fork Creek, Bridge Replacement73,000
(Base Construction Allocation - $67,000) (Design and Contingencies - $6,000)
(7) Claysville Borough, S.R.0040, Historic "S" Bridge, Bridge Rehabilitation350,000
(8) South Strabane Township, S.R.1047, T-620, Bridge Replacement125,000
(9) Hanover Township, T-853, Bridge No.6 over Kings Creek, Bridge Rehabilitation100,000
(10) Mt. Pleasant Township, T-799, Bridge No.33 over Raccoon Creek, Bridge Rehabilitation100,000
(11) West Finley Township, T-360, Bridge No.7 over Wheeling Creek, Bridge Rehabilitation150,000
(12) City of Washington, West Wheeling Street, Bridge No.58 over Chartiers Creek, Bridge Replacement250,000
(13) City of Washington, West Maiden Street, Bridge No.59 over Chartiers Creek, Bridge Replacement250,000
(14) Somerset Township, T-461, Bridge No.30 over Pigeon Creek, Bridge Replacement250,000
(15) East Finley Township, T-414, Bridge No.30 over Wheeling Creek, Bridge Rehabilitation125,000
(16) North Franklin Township, T-505, Bridge No.64 over Chartiers Creek, Bridge Replacement200,000
(17) West Finley Township, T-314, Bridge No.1 over Middle Wheeling Creek, Bridge Rehabilitation100,000
(18) Hanover Township, T-859, Bridge No.4 over Raccoon Creek, Bridge Replacement200,000
(19) West Finley Township, T-307, Bridge No.5 over Wheeling Creek, Bridge Rehabilitation100,000
(20) East Finley Township, T-450, Bridge No.23 over Wheeling Creek, Bridge Rehabilitation100,000
(21) East Finley Township, T-408, Bridge No.28 over Wheeling Creek, Bridge Rehabilitation100,000
(22) Amwell Township, T-732, Bridge No.40 over Ten Mile Creek, Bridge Replacement300,000
(23) Robinson Township, T-839, Bridge No.13 over Raccoon Creek, Bridge Replacement250,000
(24) Robinson and Smith Townships, T-506, Bridge No.11 over Raccoon Creek, Bridge Replacement200,000
(25) Nottingham Township, T-820, Bridge No.13 over Mingo Creek, Bridge Replacement200,000
(26) Canton Township, T-390, Bridge No.63 over Chartiers Creek, Bridge Rehabilitation140,000
(27) City of Washington, Bridge No.61 over Catfish Creek, Bridge Replacement350,000
(28) Canton Township, T-530, Weirich Avenue Bridge, Bridge Replacement150,000
(29) Canton Township, T-545, The Road Bridge, Bridge Replacement150,000
(30) East Bethlehem Township, T-325, Bridge No.11 over Ten Mile Creek, Bridge Rehabilitation200,000
(31) Canton Township, T-629, Bridge No.53 over Chartiers Creek, Bridge Replacement225,000
(32) Charleroi Borough, Calvery Road Bridge over Maple Creek, Bridge Replacement200,000
(Base Construction Allocation - $170,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(b) State Bridges
(1) S.R.0040, Lane-Bane Bridge over Monongahela River, West Brownsville Borough, Bridge Rehabilitation6,805,000
(Base Construction Allocation - $6,000,000) (Land Allocation - $5,000) (Design and Contingencies - $800,000)
(2) S.R.0136, Beau Street Bridge over I-70, East Washington Borough, Bridge Rehabilitation1,266,000
(Base Construction Allocation - $1,142,000) (Land Allocation - $10,000) (Design and Contingencies - $114,000)
(3) S.R.0231, Templeton Bridge over Branch of Templeton's Fork, East Finley Township, Bridge Replacement250,000
(Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(4) S.R.0917, Saw Mill Run Bridge over Branch of Saw Mill Run, Fallowfield Township, Bridge Replacement275,000
(Base Construction Allocation - $225,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(5) S.R.0980, Canonsburg Bridge No.1 over Chartiers Creek, Canonsburg Borough, Bridge Replacement1,010,000
(Base Construction Allocation - $885,000) (Land Allocation - $40,000) (Design and Contingencies - $85,000)
(6) S.R.0980, Canonsburg Bridge No.2 over Bridge of Chartiers Creek, Canonsburg Borough, Bridge Replacement590,000
(Base Construction Allocation - $500,000) (Land Allocation - $40,000) (Design and Contingencies - $50,000)
(7) S.R.1087, Crookham Bridge over Mingo Creek, Carroll Township, Bridge Replacement190,000
(Base Construction Allocation - $159,000) (Land Allocation - $15,000) (Design and Contingencies - $16,000)
(8) S.R.2037, Westside Bridge over Westside Creek, Fallowfield Township, Bridge Replacement84,000
(Base Construction Allocation - $66,000) (Land Allocation - $11,000) (Design and Contingencies - $7,000)
(9) S.R.4004, Raccoon Creek Bridge over Raccoon Creek, Hanover and Smith Townships, Bridge Replacement750,000
(Base Construction Allocation - $650,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000)
(10) S.R.4037, Robinson Run Bridge over Branch of Robinson Run, Robinson Township, Bridge Replacement400,000
(Base Construction Allocation - $345,000) (Land Allocation - $20,000) (Design and Contingencies - $35,000)
(11) S.R.1002, Segment 0100 Offset 1284, Peters Township, Bridge Replacement750,000
(Base Construction Allocation - $750,000)
(12) S.R.2041 over Branch of Pike Run, West Pike Run Township, Bridge Replacement500,000
(Base Construction Allocation - $500,000)
(13) S.R.4018, Cross Creek Bridge East of Avella, Bridge Replacement350,000
(Base Construction Allocation - $350,000)
(14) S.R.3023 over LR798, Donegal Township, Bridge Replacement750,000
(Base Construction Allocation - $750,000)
(15) S.R.1010 over Brush Run, Peters Township, Bridge Replacement750,000
(Base Construction Allocation - $750,000)
(16) S.R.0519, Segment 0150 Offset 0921, North Strabane Township, Bridge Replacement1,500,000
(Base Construction Allocation - $1,500,000)
(17) S.R.0019, Bridge over Ten Mile Creek, Amwell Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(18) S.R.0070, Bridge over Railroad Street, Donegal Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(19) S.R.0070, Bridge over Lafayette Street, Claysville Borough, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(20) S.R.0070, Bridge over Railroad Street and Abandoned Railroad, Donegal Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(21) S.R.0070, Bridge over S.R.3009, Buffalo Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(22) S.R.0070, Bridge over S.R.3009, Buffalo Township, Bridge Rehabilitation185,000
(Base Construction Allocation - $155,000) (Design and Contingencies - $30,000)
(23) S.R.0070, Bridge over I-79, South Strabane Township, Bridge Rehabilitation640,000
(Base Construction Allocation - $590,000) (Design and Contingencies - $50,000)
(24) S.R.0070, Bridge over S.R.2023, Fallowfield Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(25) S.R.0079, Bridge over S.R.2020, Amwell Township, Bridge Rehabilitation190,000
(Base Construction Allocation - $160,000) (Design and Contingencies - $30,000)
(26) S.R.0079, Bridge over S.R.2006, Amwell Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(27) S.R.0079, Bridge over S.R.0019, Amwell Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(28) S.R.0079, Bridge over S.R.0019, Amwell Township, Bridge Rehabilitation195,000
(Base Construction Allocation - $165,000) (Design and Contingencies - $30,000)
(29) S.R.0079, Bridge over S.R.0019, Amwell Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(30) S.R.0079, Bridge over S.R.1045, South Strabane Township, Bridge Rehabilitation185,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $35,000)
(31) S.R.0079, Bridge over S.R.1041, South Strabane Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(32) S.R.1010, Thompsonville Bridge over Brush Run, Peters Township, Bridge Rehabilitation105,000
(Base Construction Allocation - $75,000) (Design and Contingencies - $30,000)
(33) S.R.2022, Bridge over Barrs Run, West Bethlehem Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(34) S.R.4061, Bridge over Brush Run, Hopewell and Blaine Townships, Bridge Rehabilitation105,000
(Base Construction Allocation - $75,000) (Design and Contingencies - $30,000)
(35) S.R.4004, Old 22, Smith and Hanover Townships, Bridge Replacement350,000
(36) S.R.4004, Old 22, Smith and Hanover Townships, Bridge Replacement350,000
(37) S.R.1006, Peters Township, Bridge Replacement500,000
(38) S.R.1002, East McMurray and Valley Brook Roads, Bridge Replacement500,000
(39) S.R.0980, McDonald Borough, Bridge Replacement400,000
(40) S.R.2007, South Franklin Township, Bridge Replacement500,000
(41) S.R.0331, Hopewell Township, Bridge Replacement1,000,000
(42) S.R.0080, Carroll Township, Bridge Replacement500,000
(43) S.R.0040, North Bethlehem Township, Bridge Replacement1,000,000
(44) S.R.0040, West Brownsville Borough, Bridge Replacement1,000,000
(45) S.R.1009, Cecil Township, Bridge Replacement500,000
(46) S.R.2037, Fallowfield Township, Bridge Replacement500,000
(47) S.R.2037, Fallowfield Township, Bridge Replacement500,000
(48) S.R.2020, Amwell Township, Bridge Replacement500,000
(49) S.R.2020, Amwell Township, Bridge Replacement500,000
(50) S.R.2024, East Bethlehem Township, Bridge Replacement500,000
(51) S.R.2011, Deemston Borough, Bridge Replacement350,000
(52) S.R.4029, Cross Creek Township, Bridge Replacement500,000
(53) S.R.0980, Canonsburg Borough, Bridge Replacement500,000
(54) S.R.1009, Murry Hill Bridge over Railroad, North Strabane Township, Bridge Replacement560,000
Section 68. Wayne County.
(a) Local Bridges
(1) Buckingham Township, T-603, Bridge No.5 over Equinunk Creek (Factory), Bridge Replacement281,000
(Base Construction Allocation - $250,000) (Land Allocation - $1,000) (Design and Contingencies - $30,000)
(2) Damascus Township, T-508, Bridge No.9 over South Branch of Calkins Creek (Boyd's Mills), Bridge Replacement132,000
(Base Construction Allocation - $110,000) (Land Allocation - $2,000) (Design and Contingencies - $20,000)
(3) Damascus Township, T-677, Bridge No.10 over North Branch of Calkins Creek (High Bridge), Bridge Replacement122,000
(Base Construction Allocation - $100,000) (Land Allocation - $2,000) (Design and Contingencies - $20,000)
(4) Damascus Township, T-636, Bridge No.11 over North Branch of Calkins Creek (Bishoff), Bridge Replacement220,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(5) Preston Township, T-682, Bridge No.30 over Equinunk Creek (Dolans), Bridge Replacement172,000
(Base Construction Allocation - $150,000) (Land Allocation - $2,000) (Design and Contingencies - $20,000)
(6) Preston Township, T-684, Bridge No.31 over Equinunk Creek (Williams), Bridge Replacement209,000
(Base Construction Allocation - $180,000) (Land Allocation - $4,000) (Design and Contingencies - $25,000)
(7) Prompton Borough, T-444, Bridge No.32 over Van Auken Creek, Bridge Replacement180,000
(Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(b) State Bridges
(1) S.R.1016, Bridge over Hollister Creek, Damascus Township, Bridge Replacement415,000
(Base Construction Allocation - $360,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(2) S.R.0191 over Dyberry Creek, Dyberry Township, Bridge Replacement570,000
(Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(3) S.R.0006, Bridge over Lackawaxen River, Hawley Borough, Bridge Replacement2,395,000
(Base Construction Allocation - $2,120,000) (Land Allocation - $20,000) (Design and Contingencies - $255,000)
(4) S.R.4043, Bridge over Branch of Sherman Creek, Scott Township, Bridge Replacement469,000
(Base Construction Allocation - $410,000) (Land Allocation - $10,000) (Design and Contingencies - $49,000)
(5) S.R.4023, Bridge No.2 over West Branch of Lackawaxen River, Mount Pleasant Township, Bridge Replacement410,000
(Base Construction Allocation - $358,000) (Land Allocation - $10,000) (Design and Contingencies - $42,000)
(6) S.R.4037, Bridge over Oquaga Creek, Scott Township, Bridge Replacement805,000
(Base Construction Allocation - $710,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000)
(7) S.R.1002 over Delaware River, Damascus Township, Bridge Replacement3,410,000
(Base Construction Allocation - $3,000,000) (Land Allocation - $10,000) (Design and Contingencies - $400,000)
(8) S.R.0191 over Delaware River, Buckingham Township, Bridge Replacement1,240,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000)
(9) S.R.4023, Bridge over West Branch of Lackawaxen River, Mount Pleasant Township, Bridge Replacement410,000
(Base Construction Allocation - $358,000) (Land Allocation - $10,000) (Design and Contingencies - $42,000)
(10) S.R.4008, Bridge over Johnson Creek, Mount Pleasant Township, Bridge Replacement395,000
(Base Construction Allocation - $344,000) (Land Allocation - $10,000) (Design and Contingencies - $41,000)
(11) S.R.0296, Bridge over Branch of Middle Creek, Canaan Township, Bridge Replacement420,000
(Base Construction Allocation - $365,000) (Land Allocation - $10,000) (Design and Contingencies - $45,000)
(12) S.R.0296, Bridge over Branch of Lackawaxen River, Clinton Township, Bridge Replacement585,000
(Base Construction Allocation - $515,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(13) S.R.0196, Bridge over Middle Creek, Lake Township, Bridge Replacement1,018,000
(Base Construction Allocation - $900,000) (Land Allocation - $10,000) (Design and Contingencies - $108,000)
(14) S.R.0191, Bridge over Shehawken Creek, Buckingham Township, Bridge Replacement816,000
(Base Construction Allocation - $720,000) (Land Allocation - $10,000) (Design and Contingencies - $86,000)
(15) S.R.0191, Bridge over Branch of Wallenpaupack Creek, Dreher Township, Bridge Replacement402,000
(Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $42,000)
(16) S.R.0507, Bridge over Wallenpaupack Creek, Dreher Township, Bridge Replacement710,000
(Base Construction Allocation - $625,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000)
(17) S.R.1023, Bridge over South Branch Equinunk Creek, Manchester Township, Bridge Replacement402,000
(Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $42,000)
(18) S.R.4007, Bridge over Crooked Creek, Buckingham Township, Bridge Replacement458,000
(Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $48,000)
(19) S.R.4007, Bridge over Equinunk Creek, Manchester Township, Bridge Replacement660,000
(Base Construction Allocation - $580,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(20) S.R.3046, Bridge over Spring Run, Dreher Township, Bridge Replacement346,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $36,000)
(21) S.R.3002, Bridge over Stevens Creek, Sterling Township, Bridge Replacement503,000
(Base Construction Allocation - $440,000) (Land Allocation - $10,000) (Design and Contingencies - $53,000)
(22) S.R.2007, Bridge over Carley Brook, Honesdale Borough, Bridge Replacement462,000
(Base Construction Allocation - $404,000) (Land Allocation - $10,000) (Design and Contingencies - $48,000)
(23) S.R.0084, 6 Bridges on I-84, Sterling Township, Bridge Rehabilitations1,794,000
(Base Construction Allocation - $1,560,000) (Design and Contingencies - $234,000)
(24) S.R.0170, Bridge over Lackawaxen River, Clinton Township, Bridge Rehabilitation174,000
(Base Construction Allocation - $151,000) (Design and Contingencies - $23,000)
(25) S.R.0170, Lackawaxen Bridge No.2 over Lackawaxen River, Clinton Township, Bridge Rehabilitation124,000
(Base Construction Allocation - $108,000) (Design and Contingencies - $16,000)
(26) S.R.0170, Lackawaxen Bridge No.3 over Lackawaxen River, Mt. Pleasant Township, Bridge Rehabilitation124,000
(Base Construction Allocation - $108,000) (Design and Contingencies - $16,000)
(27) S.R.3005, Bridge over I-84, Sterling Township, Bridge Rehabilitation152,000
(Base Construction Allocation - $132,000) (Design and Contingencies - $20,000)
Section 69. Westmoreland County.
(a) Local Bridges
(1) Latrobe Borough, Loyalhanna Street Bridge over Conrail and S.R.9900, Bridge Replacement450,000
(Base Construction Allocation - $400,000) (Land Allocation - $50,000)
(2) Hempfield Township, T-471, Bridge on Lash Road, Bridge Replacement518,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $68,000)
(3) Sewickley Township, T-623 over Tributary of Little Sewickley Creek, Bridge Replacement130,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000)
(4) Hempfield Township, T-398, Old Route No.30, Bridge Replacement530,000
(Base Construction Allocation - $400,000) (Land Allocation - $40,000) (Design and Contingencies - $90,000)
(5) Hempfield Township, T-865, Old Airport Road Hill Bridge, Bridge Replacement630,000
(Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000)
(6) Hempfield Township, T-987, Brookdale Bridge, Bridge Replacement550,000
(Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000)
(7) City of Greensburg, Laird Street Bridge, Bridge Replacement235,000
(Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000)
(8) Murrysville Borough and Washington Township, Ludwig Road Bridge No.39, Bridge Replacement190,000
(Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000)
(9) Sewickley Township, T-398 Bridge over Little Sewickley Creek, Bridge Replacement703,000
(Base Construction Allocation - $630,000) (Land Allocation - $10,000) (Design and Contingencies - $63,000)
(10) Murrysville and Delmont Boroughs, Old William Penn Highway Bridge E11, Bridge Replacement185,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $35,000)
(11) Murrysville Borough, Kemerer Road Bridge No.20 over Branch of Steels Run, Bridge Replacement95,000
(Base Construction Allocation - $75,000) (Design and Contingencies - $20,000)
(12) Youngwood Borough, Hillis Street Bridge No.64, Bridge Replacement265,000
(Base Construction Allocation - $233,000) (Land Allocation - $10,000) (Design and Contingencies - $22,000)
(13) Youngwood Borough, Depot Street Bridge, Bridge Replacement545,000
(Base Construction Allocation - $475,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000)
(14) Hempfield Township, T-398, Old Route 30 Bridge, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $30,000)
(15) Hempfield Township, T-470, Ladysmith Road Bridge, Bridge Replacement690,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $90,000)
(16) Hempfield Township, T-748, Sweitzer Road Bridge, Bridge Replacement920,000
(Base Construction Allocation - $800,000) (Design and Contingencies - $120,000)
(17) Hempfield Township, T-474, Whigham Road Bridge, Bridge Replacement576,000
(Base Construction Allocation - $500,000) (Land Allocation - $1,000) (Design and Contingencies - $75,000)
(18) Hempfield Township, T-655, Rocky Mountain Bridge, Bridge Replacement518,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $68,000)
(19) Hempfield Township, T-792, Pore Road Bridge, Bridge Replacement230,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $30,000)
(20) Hempfield Township, T-865, Airport Hill Road Bridge, Bridge Replacement575,000
(Base Construction Allocation - $500,000) (Design and Contingencies - $75,000)
(21) Hempfield Township, T-987, Brookdale Drive Bridge, Bridge Replacement518,000
(Base Construction Allocation - $450,000) (Design and Contingencies - $68,000)
(22) New bridge spanning Allegheny River to connect S.R.0028 and S.R.0366, New Bridge Construction131,500,000
(23) City of New Kensington, Locust Street Viaduct, Bridge Replacement1,500,000
(Base Construction Allocation - $1,500,000)
(24) City of Lower Burrell, Edgecliff Road Bridge, Bridge Replacement225,000
(Base Construction Allocation - $225,000)
(25) North Huntington Township, Bratkovich Road Bridge, Bridge Replacement9,152,000
(Base Construction Allocation - $9,152,000)
(26) North Huntington Township, Long Run Bridge over Long Run, Bridge Replacement46,000
(Base Construction Allocation - $32,000) (Land Allocation - $11,000) (Design and Contingencies - $3,000)
(27) Wallace Avenue Bridge, Bridge Replacement22,000
(Base Construction Allocation - $12,000) (Design and Contingencies - $10,000)
(28) North Huntington Township, McCavett Road Bridge over Conrail, Bridge Replacement1,115,000
(Base Construction Allocation - $1,015,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000)
(29) City of New Kensington, Bridge No.1, Locust Street, Bridge Replacement30,000
(Base Construction Allocation - $30,000)
(30) City of New Kensington, Fourth Street Bridge No.2 over Little Pucketa Creek, Bridge Construction16,000
(Base Construction Allocation - $16,000)
(31) City of New Kensington, Fourth Street Bridge No.2, Bridge Replacement29,000
(Base Construction Allocation - $29,000)
(32) City of New Kensington, Locust Street Bridge No.1 over Conrail, Bridge Construction65,000
(Base Construction Allocation - $65,000)
(33) Upper Burrell Township, Hartge Road over Little Pucketa Creek, Bridge Replacement110,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $10,000)
(34) Loyalhanna Township, T-921, Bridge over Getty Run, Bridge Replacement150,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(35) Mt. Pleasant Township, T-413, Bridge over Jacobs Creek, Bridge Rehabilitation150,000
(Base Construction Allocation - $120,000) (Design and Contingencies - $30,000)
(36) Sewickley Township, T-633, Greenhills Road over Tributary of Little Sewickley Creek, Bridge Replacement110,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $10,000)
(37) Sewickley Township, T-318, Shaner Road No.8 over Tributary of Youghiogheny River, Bridge Replacement40,000
(Base Construction Allocation - $30,000) (Design and Contingencies - $10,000)
(b) State Bridges
(1) S.R.0056, Seward Bridge over Railroad and Borough Road, St. Clair Township, Bridge Replacement2,650,000
(Base Construction Allocation - $2,385,000) (Land Allocation - $40,000) (Design and Contingencies - $225,000)
(2) S.R.0070, Bridge over S.R.3005 near Pricedale, Rostraver Township, Bridge Rehabilitation1,405,000
(Base Construction Allocation - $1,250,000) (Design and Contingencies - $155,000)
(3) S.R.0070, Bridge over S.R.3003 near Speers Run, Rostraver Township, Bridge Rehabilitation3,424,000
(Base Construction Allocation - $3,140,000) (Design and Contingencies - $284,000)
(4) S.R.0259, Snyders Run Bridge over Branch of Snyders Run, Fairfield Township, Bridge Replacement375,000
(Base Construction Allocation - $315,000) (Land Allocation - $30,000) (Design and Contingencies - $30,000)
(5) S.R.0259, Conrail Bolivar Underpass No.2 over S.R.0259, Bolivar Borough and Fairfield Township, Bridge Replacement460,000
(Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000)
(6) S.R.0711, Koffer Run Bridge over Koffer Run, Ligonier Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(7) S.R.1019, Hanna's Run Bridge over Branch of Hanna's Run, Ligonier Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(8) S.R.1028, Luxor Bridge over Little Crabtree Creek, Hempfield Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(9) S.R.1071, Hendricks Creek Bridge and Approach, T-987, Bridge Replacement270,000
(Base Construction Allocation - $240,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000)
(10) S.R.3003, Speers Run Bridge over Speers Run, Rostraver Township, Bridge Replacement475,000
(Base Construction Allocation - $415,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(11) S.R.3022, Bridge over Small Stream, North Huntingdon Township, Bridge Replacement425,000
(Base Construction Allocation - $370,000) (Land Allocation - $20,000) (Design and Contingencies - $35,000)
(12) S.R.4024, Boquet Bridge over Brush Run, Penn Township, Bridge Replacement297,000
(Base Construction Allocation - $263,000) (Land Allocation - $10,000) (Design and Contingencies - $24,000)
(13) S.R.0070, I-70 Bridge over Sewickley Creek, Sewickley Township, Bridge Rehabilitation660,000
(Base Construction Allocation - $600,000) (Design and Contingencies - $60,000)
(14) S.R.4075 over Chartiers Run, Upper Burrell Township, Bridge Replacement110,000
(Base Construction Allocation - $50,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(15) S.R.4036 over Pucketa Creek, Upper Burrell Township, Bridge Replacement420,000
(Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(16) S.R.4032, Bridge over Pucketa Creek, Upper Burrell Township, Bridge Replacement135,000
(Base Construction Allocation - $75,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(17) S.R.4075 over Chartiers Run, Upper Burrell Township, Bridge Replacement110,000
(Base Construction Allocation - $50,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(18) S.R.0366 over Little Pucketa Creek, City of New Kensington, Bridge Replacement470,000
(Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000)
(19) S.R.0056 over Little Pucketa Creek, City of New Kensington, Bridge Replacement160,000
(Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(20) S.R.0056, Bridge over Branch of Pucketa Creek, City of Lower Burrell, Bridge Replacement110,000
(Base Construction Allocation - $50,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(21) S.R.0366 over Pucketa Creek, City of Lower Burrell, Bridge Replacement110,000
(Base Construction Allocation - $50,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(22) S.R.3012, Sewickley Bridge over Big Sewickley Creek, South Huntington Township, Bridge Replacement51,000
(Base Construction Allocation - $36,000) (Land Allocation - $11,000) (Design and Contingencies - $4,000)
(23) S.R.2033, Mansville Bridge over Keefer Run, Cook Township, Bridge Replacement59,000
(Base Construction Allocation - $44,000) (Land Allocation - $11,000) (Design and Contingencies - $4,000)
(24) S.R.0982, Bradenville Bridge over Saxmore Run, Derry Township, Bridge Replacement446,000
(Base Construction Allocation - $385,000) (Land Allocation - $20,000) (Design and Contingencies - $41,000)
(25) S.R.1028, Luxor Bridge, Hempfield Township, Bridge Replacement350,000
(Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000)
(26) S.R.0981, Smithton Bridge over Barron Run, South Huntington Township, Bridge Replacement196,000
(Base Construction Allocation - $159,000) (Land Allocation - $12,000) (Design and Contingencies - $25,000)
(27) S.R.0217, Miller Run Bridge, Derry Township, Bridge Replacement220,000
(Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(28) S.R.0030, Irwin Viaduct over Tinkers Run, Conrail and County Road, North Huntingdon Township, Bridge Rehabilitation2,070,000
(Base Construction Allocation - $1,850,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000)
(29) S.R.0022, Murrysville Bridge over Turtle Creek and Railroad, Murrysville Borough, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(30) S.R.0022, Shieldsburg Bridge over S.R.8068, Salem Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(31) S.R.0022, Bridge over Stoney Run, Derry Township, Bridge Rehabilitation130,000
(Base Construction Allocation - $100,000) (Design and Contingencies - $30,000)
(32) S.R.0070, Bridge over S.R.3031, South Huntingdon Township, Bridge Rehabilitation205,000
(Base Construction Allocation - $175,000) (Design and Contingencies - $30,000)
(33) S.R.0070, Bridge over S.R.0031, South Huntingdon Township, Bridge Rehabilitation360,000
(Base Construction Allocation - $310,000) (Design and Contingencies - $50,000)
(34) S.R.0070, Bridge over S.R.3010, South Huntingdon Township, Bridge Rehabilitation230,000
(Base Construction Allocation - $200,000) (Design and Contingencies - $30,000)
(35) S.R.0070, Bridge over S.R.3037, Sewickley Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(36) S.R.0070, Bridge over S.R.3014, Hempfield Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(37) S.R.0070, Bridge over S.R.8034, Hempfield Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(38) S.R.0119, Bridge over Jacobs Creek, East Huntingdon Township, Bridge Rehabilitation3,533,000
(Base Construction Allocation - $3,203,000) (Land Allocation - $10,000) (Design and Contingencies - $320,000)
(39) S.R.0119, Bridge over Jacks Run, South Greensburg and Hempfield Townships, Bridge Rehabilitation160,000
(Base Construction Allocation - $130,000) (Design and Contingencies - $30,000)
(40) S.R.0119, Bridge over Crabtree Creek, Hempfield and Unity Townships, Bridge Rehabilitation190,000
(Base Construction Allocation - $160,000) (Design and Contingencies - $30,000)
(41) S.R.0981, Bridge over Saxman Run, Derry Township, Bridge Rehabilitation180,000
(Base Construction Allocation - $150,000) (Design and Contingencies - $30,000)
(42) S.R.1077, Bridge over Hannas Run near Wilten, Ligonier Township, Bridge Replacement383,000
(Base Construction Allocation - $287,000) (Land Allocation - $10,000) (Design and Contingencies - $86,000)
(43) S.R.2037, Four Mile Bridge over Branch of Four Mile Run, Cook Township, Bridge Replacement154,000
(Base Construction Allocation - $120,000) (Land Allocation - $22,000) (Design and Contingencies - $12,000)
(44) S.R.259, T-994 near Mirror Lake, Bridge over Tube Mill Creek, Fairfield Township, Bridge Rehabilitation284,000
(Base Construction Allocation - $224,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000)
(45) S.R.4048, Greenwood Road Bridge, Allegheny Township, Bridge Replacement30,000
(46) S.R.1011, Tubmill Creek Bridge over Tubmill Creek, Fairfield Township, Bridge Replacement274,000
(Base Construction Allocation - $238,000) (Land Allocation - $11,000) (Design and Contingencies - $25,000)
Section 70. Wyoming County.
(a) Local Bridges (Reserved)
(b) State Bridges
(1) S.R.2021, Bridge over Branch of Beaver Creek, Falls Township, Bridge Replacement783,000
(Base Construction Allocation - $690,000) (Land Allocation - $10,000) (Design and Contingencies - $83,000)
(2) S.R.2012, Bridge over Branch of Tunkhannock Creek, Clinton Township, Bridge Replacement884,000
(Base Construction Allocation - $780,000) (Land Allocation - $10,000) (Design and Contingencies - $94,000)
(3) S.R.2002, Bridge over Whitelock Creek, Exeter Township, Bridge Replacement654,000
(Base Construction Allocation - $575,000) (Land Allocation - $10,000) (Design and Contingencies - $69,000)
(4) S.R.3007, Bridge over Railroad, Washington Township, Bridge Replacement915,000
(Base Construction Allocation - $808,000) (Land Allocation - $10,000) (Design and Contingencies - $97,000)
(5) S.R.1025, Bridge over Conrail, Nicholson Borough, Bridge Replacement783,000
(Base Construction Allocation - $690,000) (Land Allocation - $10,000) (Design and Contingencies - $83,000)
(6) S.R.2027, Bridge over Beaver Creek, Falls Township, Bridge Replacement404,000
(Base Construction Allocation - $352,000) (Land Allocation - $10,000) (Design and Contingencies - $42,000)
(7) S.R.0011 over T.R.6, Clinton Township, Bridge Replacement1,240,000
(Base Construction Allocation - $1,100,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000)
(8) S.R.0006 over Tuscarora Creek, Braintrim Township, Bridge Replacement1,910,000
(Base Construction Allocation - $1,700,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000)
(9) S.R.1014, Bridge over Lake Sheridan Outlet, Nicholson Township, Bridge Replacement390,000
(Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(10) S.R.0087, Bridge over Susquehanna River, Mehoopany Township, Bridge Replacement5,210,000
(Base Construction Allocation - $4,700,000) (Land Allocation - $10,000) (Design and Contingencies - $500,000)
(11) S.R.0029, Bridge over Bowman's Creek, Noxen Township, Bridge Replacement732,000
(Base Construction Allocation - $645,000) (Land Allocation - $10,000) (Design and Contingencies - $77,000)
(12) S.R.2039, Bridge over Beaver Run Creek, Noxen Township, Bridge Replacement738,000
(Base Construction Allocation - $650,000) (Land Allocation - $10,000) (Design and Contingencies - $78,000)
(13) S.R.3001, Bridge over Little Mehoopany Creek, Windham Township, Bridge Replacement486,000
(Base Construction Allocation - $425,000) (Land Allocation - $10,000) (Design and Contingencies - $51,000)
(14) S.R.3002, Bridge over Bowman's Creek, Noxen Township, Bridge Replacement928,000
(Base Construction Allocation - $820,000) (Land Allocation - $10,000) (Design and Contingencies - $98,000)
(15) S.R.0029, Bridge over Swail Brook, Tunkhannock Borough, Bridge Replacement540,000
(Base Construction Allocation - $473,000) (Land Allocation - $10,000) (Design and Contingencies - $57,000)
(16) S.R.0092, Bridge over Field Brook, Nicholson Township, Bridge Replacement520,000
(Base Construction Allocation - $455,000) (Land Allocation - $10,000) (Design and Contingencies - $55,000)
(17) S.R.0307, Bridge over Buttermilk Creek, Falls Township, Bridge Replacement592,000
(Base Construction Allocation - $520,000) (Land Allocation - $10,000) (Design and Contingencies - $62,000)
(18) S.R.0307, Bridge over Beaver Creek, Falls Township, Bridge Replacement1,208,000
(Base Construction Allocation - $1,070,000) (Land Allocation - $10,000) (Design and Contingencies - $128,000)
(19) S.R.0307, Bridge over Buttermilk Creek, Falls Township, Bridge Replacement682,000
(Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $72,000)
(20) S.R.1009, Bridge over Meshoppen Creek, Lemon Township, Bridge Replacement794,000
(Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $84,000)
(21) S.R.0006, Segment 0490 Offset 0000, Bardwell Bridge over Tunkhannock Creek, Tunkhannock Township, Bridge Replacement2,260,000
(Base Construction Allocation - $2,000,000) (Land Allocation - $10,000) (Design and Contingencies - $250,000)
(22) S.R.0006, Segment 0560 Offset 0866, Bridge over S.R.1017, Clinton Township, Bridge Replacement700,000
(Base Construction Allocation - $620,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000)
(23) S.R.0117, Segment 0020 Offset 1773, Bridge over Outlet of Lake Sheridan, Factoryville Borough, Bridge Replacement280,000
(Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000)
(24) S.R.0006, Bridge over Tuscarora Creek, Braintrim Township, Bridge Rehabilitation381,000
(Base Construction Allocation - $331,000) (Design and Contingencies - $50,000)
(25) S.R.0006, Bridge over Black Walnut Creek, Meshoppen Township, Bridge Rehabilitation127,000
(Base Construction Allocation - $110,000) (Design and Contingencies - $17,000)
(26) S.R.0006, Bridge over Meshoppen Creek, Meshoppen Borough, Bridge Rehabilitation289,000
(Base Construction Allocation - $251,000) (Design and Contingencies - $38,000)
(27) S.R.0006, Bridge over Tunkhannock Creek, Tunkhannock Township, Bridge Rehabilitation127,000
(Base Construction Allocation - $110,000) (Design and Contingencies - $17,000)
(28) S.R.0011, Bridge over T.R.6, Clinton Township, Bridge Rehabilitation240,000
(Base Construction Allocation - $208,000) (Design and Contingencies - $32,000)
(29) S.R.0011, Bridge over T.R.92, Nicholson Borough, Bridge Rehabilitation141,000
(Base Construction Allocation - $122,000) (Design and Contingencies - $19,000)
(30) S.R.3003, Bridge over Mehoopany Creek, Mehoopany Township, Bridge Rehabilitation160,000
(Base Construction Allocation - $139,000) (Design and Contingencies - $21,000)
Section 71. York County.
(a) Local Bridges
(1) Penn Township, Frederick Street Bridge over Plum Creek, Bridge Replacement
250,000
(Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(2) City of York, North Beaver Street Bridge over Willis Run, Bridge Replacement362,000
(Base Construction Allocation - $300,000) (Land Allocation - $12,000) (Design and Contingencies - $50,000)
(3) City of York, North Pershing Avenue Bridge over Willis Run, Bridge Replacement338,000
(Base Construction Allocation - $288,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(4) City of York, North Newberry Street Bridge over Willis Run Bridge Replacement360,000
(Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000)
(5) City of York, Smith Street Bridge over Willis Run, Bridge Replacement338,000
(Base Construction Allocation - $288,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(6) New Freedom Borough, County Bridge on Singer Road over County Railroad and Trail, Bridge Replacement325,000
(Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000)
(7) Paradise Township, T-464, Shady Dell Road Bridge over Paradise Creek, Bridge Replacement394,000
(Base Construction Allocation - $344,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000)
(8) Dover Township, T-500, Baker Road over Little Conewago Creek, Bridge Rehabilitation250,000
(Base Construction Allocation - $200,000) (Land Allocation - $30,000) (Design and Contingencies - $20,000)
(9) Dover Borough, Reservoir Drive, Bridge over Fox Run Creek, New Bridge Construction180,000
(Base Construction Allocation - $100,000) (Land Allocation - $30,000) (Design and Contingencies - $50,000)
(10) Franklin Township, T-855, Century Lane, Bridge over Tributary of Bermudian Creek, Bridge Rehabilitation25,000
(Base Construction Allocation - $20,000) (Design and Contingencies - $5,000)
(11) Franklin Township, T-852, Capitol Hill Road, Bridge over Tributary of Bermudian Creek, Bridge Rehabilitation25,000
(Base Construction Allocation - $20,000) (Design and Contingencies - $5,000)
(b) State Bridges
(1) S.R.0295, Susquehanna Trail over Conewago Creek, Conewago and Newberry Townships, Bridge Replacement6,260,000
(Base Construction Allocation - $5,400,000) (Land Allocation - $50,000) (Design and Contingencies - $810,000)
(2) S.R.4021 over Bennetts Run, Newberry Township, Bridge Replacement581,000
(Base Construction Allocation - $497,000) (Land Allocation - $10,000) (Design and Contingencies - $74,000)
(3) S.R.0216, Three Bridges over Lake Marburg, Penn, West Manheim and Manheim Townships, Bridge Rehabilitation970,000
(Base Construction Allocation - $825,000) (Land Allocation - $20,000) (Design and Contingencies - $125,000)
(4) S.R.0074, South Queen Street Bridge over I-83, York Township, Bridge Rehabilitation900,000
(Base Construction Allocation - $850,000) (Design and Contingencies - $50,000)
(5) S.R.0124, Mt. Rose Avenue Bridge over I-83, Springettsbury Township, Bridge Rehabilitation450,000
(Base Construction Allocation - $400,000) (Design and Contingencies - $50,000)
(6) S.R.3036, I-83 Business Route Bridge over I-83, York Township, Bridge Rehabilitation350,000
(Base Construction Allocation - $300,000) (Design and Contingencies - $50,000)

Section 72. Limitation on expenditure of funds.

Any moneys derived from the incurring of debt shall be used solely for effecting the rehabilitation, replacement or removal of bridges located on State highways. All other bridge rehabilitation, replacement or removal shall be financed and State bridge rehabilitation, replacement or removal may also be financed from current revenue.

Section 73. Debt authorization.

The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $1,197,411,000 as may be found necessary to carry out the acquisition and construction of the State highway projects specifically itemized in this act.

Section 74. Issue of bonds.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, Auditor General and State Treasurer shall determine, but the latest stated maturity date shall not exceed 30 years from the date of the bond first issued for each series.

Section 75. Estimated useful life of projects.

The General Assembly states the estimated useful life of the projects itemized in this act as 30 years.

Section 76. Appropriation.

The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the department in the maximum amount of $1,197,411,000 to be used by it exclusively to defray the financial costs of the State projects specifically itemized in this capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the department the moneys as required and certified by it to be legally due and payable.

Section 77. Federal funds.

In addition to those funds appropriated in section 76, all moneys received from the Federal Government for the public improvement projects specifically itemized in this act are also hereby appropriated for those projects.

Section 78. Allocation of funds.

(a) General rule.--Whenever the department determines that the full estimated financial costs of the projects itemized in this act are not necessary for the proper design, acquisition or construction of such projects, the excess funds no longer required may be allocated by the department to increase the estimated costs of any one or more of the projects specifically itemized in a capital budget.

(b) Reimbursement of municipal expenditures.--Moneys raised or expended by municipalities after the effective date of this act, in anticipation of receipt of funds authorized for projects itemized by this act, may be reimbursable to those municipalities.

Section 79. Policy on jobs and materials.

(a) Jobs.--It is the declared policy of the Commonwealth that the construction projects authorized in this act be used, to the greatest extent possible, to provide for the creation of jobs and the rehiring of the unemployed in this Commonwealth. In order to reach this goal, firms with Commonwealth-based facilities shall be actively solicited to make bids on contracts to furnish products and materials, including, but not limited to, steel and steel products, to be used in these projects.

(b) Materials.--Every contract document entered into to undertake a project contained in this act shall provide that any steel or other products to be used or supplied in the performance of this contract shall be required to be manufactured by plants in the United States unless the secretary determines, on a contract by contract basis, that certain required products are not produced in the United States in sufficient quantities to meet the requirements of the contract. Such a determination and the reasons therefor shall be published in the Pennsylvania Bulletin. Decisions made under this subsection shall not be inconsistent with the general provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act.

(c) Minorities and women.--It is also the declared policy of the Commonwealth to require and encourage substantial participation by minorities and women in the construction projects authorized by this act.

Section 80. Payment of capital debt service.

The repayment of any debt incurred pursuant to this act shall be made from the account and such repayment shall have first claim on the revenues of the account.

Section 81. Authorization and debt cumulation.

The additional authorization and debt allowance provided for in this act shall be added to the total authorizations and debt incurred pursuant to the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, as amended.

Section 82. Effective date.

This act shall take effect immediately.