Order No. PSC-2024-0467-PHO-GU•Florida Public Service Commission native order document 09743-2024
Florida Public Service Commission native order document 09743-2024
Order No. PSC-2024-0467-PHO-GUFlapubserv
Testo completo
FILED 10/31/2024 DOCUMENT NO. 09743-2024 FPSC - COMMISSION CLERK BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Natural gas conservation cost recovery. ----------------~ DOCKET NO. 20240004-GU ORDER NO. PSC-2024-0467-PHO-GU ISSUED: October 31, 2024 PREHEARING ORDER Pursuant to Notice and in accordance with Rule 28-106.209, Florida Administrative Co de (F.A.C.), a Prehearing Conference was held on October 24, 2024, in Tallahassee, Florida, before Commissioner Gabriella Passidomo, as Prehearing Officer. APPEARANCES: BETH KEATING, ESQUIRE, Gunster, Yoakley & Stewart, P.A., 215 South Monroe St., Suite 601, Tallahassee, Florida 32301-1804 On behalf of FLORIDA PUBLIC UTILITIES COMP ANY (FPUC), FLORIDA CITY GAS (FCG), and SEBRING GAS SYSTEM (SEBRING). J. JEFFRY WAHLEN, MALCOLM N. MEANS, and VIRGINIA PONDER, ESQUIRES, Ausley McMullen, 123 S. Calhoun St., Tallahassee, Florida 32301- 1517 On behalf of PEOPLES GAS SYSTEM, INC. (PGS). DEBBIE STITT, P.O. Box 549, Port St. Joe, Florida 32457-0549 On behalf of ST. JOE NATURAL GAS COMPANY, INC. (SJNG). WALT TRIERWEILER, CHARLES J. REHWINKEL, PATRICIA A. CHRISTENSEN, MARY A. WESSLING, and OCTAVIO PONCE, ESQUIRES, 111 West Madison Street, Room 812, Tallahassee, Florida 32399-1400 On behalf of OFFICE OF PUBLIC COUNSEL (OPC). TIMOTHY SPARKS, and SAAD F AROOQI, ESQUIRES, Florida Public Service Commission, 2540 Shumard Oak Boulevard, Tallahassee, Florida 32399-0850 On behalf of the FLORIDA PUBLIC SERVICE COMMISSION (Staffl. MARY ANNE HELTON, ESQUIRE, Deputy General Counsel, Florida Public Service Commission, 2540 Shumard Oak Boulevard, Tallahassee, Florida 32399- 0850 Advisor to the Florida Public Service Commission. KEITH C. HETRICK, ESQUIRE, General Counsel, Florida Public Service Commission, 2540 Shumard Oak Boulevard, Tallahassee, Florida 32399-0850 Florida Public Service Commission General Counsel.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 2 I. CASE BACKGROUND Pursuant to Rule 25-17.015(1), Florida Administrative Code (F.A.C.), the Florida Public Service Commission (Commission) has set a hearing for its continuing Natural Gas Conservation Cost Recovery (NGCCR) docket for November 5-7, 2024. The NGCCR proceeding allows gas companies to seek recovery of their costs for approved gas conservation programs on an annual basis, pursuant to Sections 366.80-366.83, Florida Statutes (F.S.), and Chapter 25-17, F.A.C. II. CONDUCT OF PROCEEDINGS Pursuant to Rule 28-106.211, F.A.C., this Prehearing Order is issued to prevent delay and to promote the just, speedy, and inexpensive determination of all aspects of this case. III. JURISDICTION This Commission is vested with jurisdiction over the subject matter by the provisions of Chapters 120 and 366, F.S. This hearing will be governed by said Chapters and Chapters 25-7, 25-22, and 28-106, F.A.C., as well as any other applicable provisions of law. IV. PROCEDURE FOR HANDLING CONFIDENTIAL INFORMATION Information for which proprietary confidential business information status is requested pursuant to Section 366.093, F.S., and Rule 25-22.006, F.A.C., shall be treated by the Commission as confidential. The information shall be exempt from Section 119.07(1), F.S., pending a formal ruling on such request by the Commission or pending return of the information to the person providing the information. If no determination of confidentiality has been made and the information has not been made a part of the evidentiary record in this proceeding, it shall be returned to the person providing the information. If a determination of confidentiality has been made and the information was not entered into the record of this proceeding, it shall be returned to the person providing the information within the time period set forth in Section 366.093, F.S. The Commission may determine that continued possession of the information is necessary for the Commission to conduct its business. It is the policy of this Commission that all Commission hearings be open to the public at all times. The Commission also recognizes its obligation pursuant to Section 366.093, F.S., to protect proprietary confidential business information from disclosure outside the proceeding. Therefore, any party wishing to use any proprietary confidential business information, as that term is defined in Section 366.093, F.S., at the hearing shall adhere to the following: (1) When confidential information is used in the hearing that has not been filed as prefiled testimony or prefiled exhibits, parties must have copies for the Commissioners, necessary staff, and the court reporter, in red envelopes clearly marked with the nature of the contents and with the confidential information
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 3 highlighted. Any party wishing to examine the confidential material that is not subject to an order granting confidentiality shall be provided a copy in the same fashion as provided to the Commissioners, subject to execution of any appropriate protective agreement with the owner of the material. (2) Counsel and witnesses are cautioned to avoid verbalizing confidential information in such a way that would compromise confidentiality. Therefore, confidential information should be presented by written exhibit when reasonably possible. At the conclusion of that portion of the hearing that involves confidential information, all copies of confidential exhibits shall be returned to the proffering party. If a confidential exhibit has been admitted into evidence, the copy provided to the court reporter shall be retained in the Office of Commission Clerk’s confidential files. If such material is admitted into the evidentiary record at hearing and is not otherwise subject to a request for confidential classification filed with the Commission, the source of the information must file a request for confidential classification of the information within 21 days of the conclusion of the hearing, as set forth in Rule 25-22.006(8)(b), F.A.C., if continued confidentiality of the information is to be maintained. V. PREFILED TESTIMONY AND EXHIBITS; WITNESSES Testimony of all witnesses to be sponsored by the parties (and Staff) has been prefiled and will be inserted into the record as though read after the witness has taken the stand and affirmed the correctness of the testimony and associated exhibits. All testimony remains subject to timely and appropriate objections. Upon insertion of a witness' testimony, exhibits appended thereto may be marked for identification. Each witness will have the opportunity to orally summarize his or her testimony at the time he or she takes the stand. Summaries of testimony shall be limited to three minutes. Witnesses are reminded that, on cross-examination, responses to questions calling for a simple yes or no answer shall be so answered first, after which the witness may explain his or her answer. After all parties and Staff have had the opportunity to cross-examine the witness, the exhibit may be moved into the record. All other exhibits may be similarly identified and entered into the record at the appropriate time during the hearing. The Commission frequently administers the testimonial oath to more than one witness at a time. Therefore, when a witness takes the stand to testify, the attorney calling the witness is directed to ask the witness to affirm whether he or she has been sworn. The parties shall avoid duplicative or repetitious cross-examination. Further, friendly cross-examination will not be allowed. Cross-examination shall be limited to witnesses whose testimony is adverse to the party desiring to cross-examine. Any party conducting what appears to be a friendly cross-examination of a witness should be prepared to indicate why that witness’s direct testimony is adverse to its interests.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 4 VI. ORDER OF WITNESSES Each witness whose name is preceded by a plus sign (+) has been excused from attending the final hearing. Witness Proffered By Issues # Direct +Derrick M. Craig FCG / FPUC 1-9 +Miguel Bustos FCG 1 +Charles T. Morgan II PGS 1-7 +Jerry H. Melendy SEBRING 1-7 +Debbie K. Stitt SJNG 1-7 VII. BASIC POSITIONS FCG: The Commission should approve FPUC’s and FCG’s final net true-ups for the period January through December, 2023, the estimated true-up for the period January through December, 2024, and the projected conservation program expenses and recovery factors for each for the period January through December, 2025. FPUC: The Commission should approve FPUC’s and FCG’s final net true-ups for the period January through December, 2023, the estimated true-up for the period January through December, 2024, and the projected conservation program expenses and recovery factors for each for the period January through December, 2025. PGS: The Commission should determine that the company has properly calculated its conservation cost recovery true-up and projections and the natural gas conservation cost recovery factors set forth in the testimony and exhibits of Witness Charles T. Morgan II for the period January 2025 through December 2025. SEBRING: The Commission should approve Sebring’s respective final net true-ups for the period January through December 2023, the estimated true-up for the period January through December, 2024, and the projected conservation program expenses and recovery factors for the period January through December, 2025.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 5 SJNG: The Commission should approve the final adjusted net true-up amount for the twelve- month period ending December 31, 2024 including interest, the projected conservation program expenses for the twelve-month period ending Dec 31, 2025 and the Conservation Cost Recovery Factors to be applied to customer bills rendered for the twelve-month period ending December 31, 2025 as filed by SJNG. OPC: The utilities bear the burden of proof to justify the recovery of costs they request in this docket. The utilities must carry this burden regardless of whether or not the Interveners provide evidence to the contrary. Further, the utilities bear the burden of proof to support their proposal(s) seeking the Commission's adoption of policy statements (whether new or changed) or other affirmative relief sought. Even if the Commission has previously approved a program, recovery of a cost, factor, or adjustment as meeting the Commission’s own requirements, the utilities still bear the burden of demonstrating that the costs submitted for final recovery meet any statutory test(s) and are reasonable in amount and prudently incurred. Further, recovery of all costs is constrained by the Commission’s obligation to set fair, just, and reasonable rates, based on projects that are prudent in purpose and scope and costs that are prudently incurred pursuant to Section 366.01, Florida Statutes. Additionally, the provisions of Chapter 366 must be liberally construed to protect the public welfare. Natural gas conservation costs may not be costs that are recovered through base rates or any other cost recovery mechanism. STAFF: Staff's positions are preliminary and based on materials filed by the parties and on discovery. The preliminary positions are offered to assist the parties in preparing for the hearing. Staff's final positions will be based upon all the evidence in the record and may differ from the preliminary positions stated herein. VIII. ISSUES AND POSITIONS ISSUE A: Should FPUC and FCG be authorized to consolidate their natural gas conservation costs and recovery amounts? Proposed stipulation – See Section X. ISSUE 1: What are the final conservation cost recovery adjustment true-up amounts for the period January 2023 through December 2023? Proposed stipulation – See Section X.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 6 ISSUE 2: What are the appropriate total conservation adjustment actual/estimated true-up amounts for the period January 2024 through December 2024? Proposed stipulation – See Section X. ISSUE 3: What are the appropriate total conservation adjustment true-up amounts to be collected/refunded for the period January 2025 through December 2025? Proposed stipulation – See Section X. ISSUE 4: What are the total conservation cost recovery amounts to be collected during the period January 2025 through December 2025? Proposed stipulation – See Section X. ISSUE 5: What are the conservation cost recovery factors for the period January 2025 through December 2025? Proposed stipulation – See Section X. ISSUE 6: Should the Commission approve revised tariffs reflecting the natural gas conservation cost recovery amounts determined to be appropriate in this proceeding? Proposed stipulation – See Section X. ISSUE 7: What should be the effective date of the new conservation cost recovery factors for billing purposes? Proposed stipulation – See Section X. ISSUE 8: Should this docket be closed? Proposed stipulation – See Section X.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 7 IX. EXHIBIT LIST Witness Proffered By Description Direct Derrick M. Craig FCG / FPUC DMC-1 True-Up Variance Analysis. [Schedules CT1-CT6] (FPUC only) Derrick M. Craig FCG / FPUC DMC-2 Projections: Estimated ECCR charges by rate class. [Schedules C-1 through C-4] (Consolidated: FPUC/FCG) Derrick M. Craig FCG / FPUC DMC-3 Projections: Estimated ECCR charges by rate class. [Schedules C-1 through C-4] (Separate: FPUC and FCG) Miguel Bustos FCG MB-1 True-Up Variance Analysis. [Schedules CT1-CT6] (FCG only) Charles T. Morgan II PGS CTM-1 Schedules supporting cost recovery factor, actual January 2023 – December 2023 Charles T. Morgan II PGS CTM-2 Schedules supporting conservation costs projected for the period July 2024 – December 2025 Jerry H. Melendy SEBRING JHM-1 True-Up Variance Analysis. [Schedules CT1-CT6] Jerry H. Melendy SEBRING JHM-2 Projections: Estimated ECCR charges by rate class. [Schedules C-1 through C-4] Debbie K. Stitt SJNG DKS-1 Schedules CT-1, CT-2, CT-3, CT-4, and CT-5. Debbie K. Stitt SJNG DKS-2 Schedules C1, C2, C3, and C4.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 8 X. PROPOSED STIPULATIONS Following the Prehearing Conference, Type 2 stipulations1 were reached on all issues identified for resolution at hearing, with the utilities agreeing to proposed stipulations to the final and estimated true-up amounts and purchased gas cost recovery factors appropriate for each utility. The OPC position on each Type 2 stipulation is as follows: OPC takes no position on these issues nor does it have the burden of proof related to them. As such, the OPC represents that it will not contest or oppose the Commission taking action approving a proposed stipulation between the Company and another party or staff as a final resolution of the issue. No person is authorized to state that the OPC is a participant in, or party to, a stipulation on these issues, either in this docket, in an order of the Commission, or in a representation to a Court. ISSUE A: Should FPUC and FCG be authorized to consolidate their natural gas conservation costs and recovery amounts? STIPULATION: FPUC and FCG are now owned by the same corporate parent, Chesapeake Utilities Corporation. Beginning in 2025, the corporate parent stated its desire to consolidate the natural gas conservation costs and recovery amounts of FPUC and FCG. Although the factors derived from consolidated costs are likely to result in some subsidization of costs between FPUC and FCG customers, cost efficiencies are expected to materialize as well. Therefore, FPUC and FCG should be authorized to consolidate the natural gas conservation costs and recovery amounts. ISSUE 1: What are the final conservation cost recovery adjustment true-up amounts for the period January 2023 through December 2023? STIPULATION: The appropriate final conservation cost recovery true-up amounts for the period January 2023 through December 2023 are as follows: 1 A Type 2 stipulation occurs on an issue when the utility and the Commission staff, or the utility and at least one party adversarial to the utility, agree on the resolution of the issue and the remaining parties (including staff if they do not join in the agreement) do not object to us relying on the agreed language to resolve that issue in a final order.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 9 Florida City Gas The appropriate final conservation cost recovery true-up amounts for the period January 2023 through December 2023, is $161,423, Under-recovery, as reflected in Schedule CT-1, Page 1 of 1, in Exhibit MB-1. Florida Public Utilities Company The appropriate final conservation cost recovery true-up amounts for the period January 2023 through December 2023, is $239,390, Under-recovery, as reflected in Schedule CT-1, Page 1 of 1, in Exhibit DMC-1. Peoples Gas System $840,690, Over-recovery, as reflected in Schedule CT-1, Page 1 of 1, in Exhibit CTM-1. Sebring Gas System $5,301, Under-recovery, as reflected in Schedule CT-1, Page 1 of 1, in Revised Exhibit JHM-1. St. Joe’s Natural Gas Company $341, Under-recovery, as reflected in Schedule CT-1, Page 1 of 1, in Exhibit DKS-1. ISSUE 2: What are the appropriate conservation adjustment actual/estimated true-up amounts for the period January 2024 through December 2024? STIPULATION: The appropriate conservation cost adjustment actual/estimated true-up amounts, including interest, for the period January 2024 through December 2024 are as follows: Florida Public Utilities Company / Florida City Gas (if Issue A is approved) On a consolidated basis, the appropriate conservation cost adjustment actual/estimated true-up amounts, including interest, for the period January 2024 through December 2024, is $512,828, Over-recovery, as reflected in Schedule C- 3, Page 3 of 4, in Exhibit DMC-2. Florida City Gas (if Issue A is not approved) On a stand-alone basis, the appropriate conservation cost adjustment actual/estimated true-up amounts, including interest, for the period January 2024 through December 2024, is $291,875, Over-recovery, as reflected in Schedule C- 3, Page 4 of 5, in Exhibit DMC-3.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 10 Florida Public Utilities Company (if Issue A is not approved) On a stand-alone basis, the appropriate conservation cost adjustment actual/estimated true-up amounts, including interest, for the period January 2024 through December 2024, is $18,448, Over-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit DMC-3. Peoples Gas System $2,324,526, Under-recovery, as reflected in Schedule C-3, Page 3 of 4, in Exhibit CTM-2. Sebring Gas System $490, Under-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit JHM- 2. St. Joe’s Natural Gas Company $21,545, Under-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit DKS-2. ISSUE 3: What are the appropriate total conservation adjustment true-up amounts to be collected/refunded from the period January 2024 through December 2024? STIPULATION: The appropriate total conservation adjustment true-up amounts, including interest, to be collected/refunded from the period January 2024 through December 2024 are as follows: Florida Public Utilities Company / Florida City Gas (if Issue A is approved) On a consolidated basis, the appropriate total conservation adjustment true-up amounts, including interest, to be collected/refunded from the period January 2024 through December 2024, is $112,015, Over-recovery, as reflected in Schedule C-3, Page 3 of 4, in Exhibit DMC-2 Florida City Gas (if Issue A is not approved) On a stand-alone basis, the appropriate total conservation adjustment true-up amounts, including interest, to be collected/refunded from the period January 2024 through December 2024, is $130,451, Over-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit DMC-3. Florida Public Utilities Company (if Issue A is not approved) On a stand-alone basis, the appropriate total conservation adjustment true-up amounts, including interest, to be collected/refunded from the period January
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 11 2024 through December 2024, is $220,942, Under-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit DMC-3. Peoples Gas System $1,483,836, Under-recovery, as reflected in Schedule C-3, Page 3 of 4, in Exhibit CTM-2. Sebring Gas System $5,791, Under-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit JHM-2. St. Joe’s Natural Gas Company $21,886, Under-recovery, as reflected in Schedule C-3, Page 4 of 5, in Exhibit DKS-2 ISSUE 4: What is the total conservation cost recovery amounts to be collected during the period January 2025 through December 2025? STIPULATION: The appropriate total conservation cost recovery amounts to be collected during the period January 2025 through December 2025 are as follows: Florida Public Utilities Company / Florida City Gas (if Issue A is approved) On a consolidated basis, the appropriate total conservation cost recovery amounts to be collected during the period January 2025 through December 2025, is $11,435,110, which is calculated by adding the amount in Issue 3 to the Total Estimated Program costs of $11,547,125, as reflected in Schedule C-1, Page 1 of 3, in Exhibit DMC-2. Florida City Gas (if Issue A is not approved) On a stand-alone basis, the appropriate total conservation cost recovery amounts to be collected during the period January 2025 through December 2025, is $6,773,149, which is calculated by subtracting the amount in Issue 3 from the Total Estimated Program Costs of $6,903,600, as reflected in Schedule C-1, Page 1 of 1, in Exhibit DMC-3. Florida Public Utilities Company (if Issue A is not approved) On a stand-alone basis, the appropriate total conservation cost recovery amounts to be collected during the period January 2025 through December 2025, is $4,864,467, which is calculated by subtracting the amount in Issue 3 from the Total Estimated Program Costs of $4,643,525, as reflected in Schedule C-1, Page 1 of 3, in Exhibit DMC-3.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 12 Peoples Gas System $37,821,603, which is calculated by adding the amount in Issue 3 to the Total Estimated Program Costs of $36,337,767, as reflected in Schedule C-1, Page 1 of 1, in Exhibit CTM-2. Sebring Gas System $42,074, which is calculated by adding the amount in Issue 3 to the Total Estimated Program Costs of $36,283, as reflected in Schedule C-1, Page 1 of 1, in Exhibit JHM-2. St. Joe’s Natural Gas Company $140,341, which is calculated by subtracting the amount in Issue 3 from the Total Estimated Program Costs of $166,750, as reflected in Schedule C-1, Page 1 of 1, in Exhibit DKS-2. ISSUE 5: What are the conservation cost recovery factors for the period January 2025 through December 2025? STIPULATION: The appropriate conservation cost recovery factors for the period January 2025 through December 2025 are as follows: Florida Public Utilities Company / Florida City Gas (if Issue A is approved) The appropriate total conservation cost recovery factors for the period January 2025 through December 2025 are shown below: 2025 Conservation Cost Recovery Factors for Florida Public Utilities Company (based on consolidated costs), as reflected in Schedule C-1, Page 1 of 1, from Exhibit DMC-2 Rate Schedule Conservation Recovery Factor ($/therm) Residential-1; Residential Transportation-1 (< 100 therms) 0.23352 Residential-2; Residential Transportation-2 (>100 and < 250 therms) 0.12933 Residential-3; Residential Transportation-3 (>250 therms) 0.07241 Residential Standby Generator 0.26598 General Service-1; GS Transportation-1 (< 1,000 therms) 0.11003 General Service-2; GS Transportation-2 (> 1,000 and < 5,000 therms) 0.05653
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 13 General Service-3; GS Transportation-3 (> 5,000 and < 10,000 therms) 0.04941 General Service-4; GS Transportation-4 (> 10,000 and < 50,000 therms) 0.04376 General Service-5; GS Transportation-5 (> 50,000 and < 250,000 therms) 0.03305 General Service-6; GS Transportation-6 (> 250,000 and < 500,000 therms) 0.03080 General Service-7; GS Transportation-7 (> 500,000 and < 1,000,000 therms) 0.02520 General Service-8A; GS Transportation-8A (> 1,000,000 and < 1,500,000 therms) 0.02415 General Service-8B; GS Transportation-8B (> 1,500,000 and < 2,000,000 therms) 0.02218 General Service-8C; GS Transportation-8C (> 2,000,000 and < 4,000,000 therms) 0.01262 General Service-8D; GS Transportation-8D (> 4,000,000 therms) 0.01035 Commercial – NGV; Commercial NGV Transportation 0.02907 Commercial Standby Generator 0.31940 2025 Conservation Cost Recovery Factors for Florida City Gas (based on consolidated costs), as reflected in Schedule C-1, Page 1 of 1, from Exhibit DMC-2 Rate Schedule Conservation Recovery Factor ($/therm) RS1 0.25141 RS-100 0.11554 RS-600 0.06816 GS-1 0.04592 GS-6K 0.03291 GS-25K 0.03059 Gas Lights 0.03615 GS-120K 0.02165 GS-1250K 0.01252 GS11M 0.00000 GS-25M 0.00000
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 14 Florida Public Utilities Company / Florida City Gas (if Issue A is not approved) The appropriate total conservation cost recovery factors for the period January 2025 through December 2025 are shown below: 2025 Conservation Cost Recovery Factors for Florida Public Utilities Company (based on stand-alone costs), as reflected in Schedule C-1, Page 1 of 1, from the FPUC portion of Exhibit DMC-3 Rate Schedule Conservation Recovery Factor ($/therm) Residential-1; Residential Transportation-1 (< 100 therms) 0.17735 Residential-2; Residential Transportation-2 (>100 and < 250 therms) 0.09822 Residential-3; Residential Transportation-3 (>250 therms) 0.05500 Residential Standby Generator 0.20201 General Service-1; GS Transportation-1 (< 1,000 therms) 0.08356 General Service-2; GS Transportation-2 (> 1,000 and < 5,000 therms) 0.04294 General Service-3; GS Transportation-3 (> 5,000 and < 10,000 therms) 0.03753 General Service-4; GS Transportation-4 (> 10,000 and < 50,000 therms) 0.03324 General Service-5; GS Transportation-5 (> 50,000 and < 250,000 therms) 0.02510 General Service-6; GS Transportation-6 (> 250,000 and < 500,000 therms) 0.02339 General Service-7; GS Transportation-7 (> 500,000 and < 1,000,000 therms) 0.01914 General Service-8A; GS Transportation-8A (> 1,000,000 and < 1,500,000 therms) 0.01834 General Service-8B; GS Transportation-8B (> 1,500,000 and < 2,000,000 therms) 0.01684 General Service-8C; GS Transportation-8C (> 2,000,000 and < 4,000,000 therms) 0.00959 General Service-8D; GS Transportation-8D (> 4,000,000 therms) 0.00786 Commercial – NGV; Commercial NGV Transportation 0.02208 Commercial Standby Generator 0.24258
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 15 Peoples Gas System The appropriate total conservation cost recovery factors for the period January 2025 through December 2025 are shown below: 2025 Conservation Cost Recovery Factors for Florida City Gas (based on stand-alone costs), as reflected in Schedule C-1, Page 1 of 1, from Exhibit DMC-3 Rate Schedule Conservation Recovery Factor ($/therm) RS1 0.32153 RS-100 0.14777 RS-600 0.08717 GS-1 0.05873 GS-6K 0.04209 GS-25K 0.03912 Gas Lights 0.04623 GS-120K 0.02769 GS-1250K 0.01602 GS11M 0.00000 GS-25M 0.00000 2025 Conservation Cost Recovery Factors for Peoples Gas System, as reflected in Schedule C-1, Page 1 of 1, from Exhibit CTM-2 Rate Schedule Conservation Recovery Factor ($/therm) RS, RS-SG, and RS-GHP 0.17732 SGS 0.11074 GS-1, CS-SG, and CS-GHIP 0.05851 GS-2 0.04497 GS-3 0.03793 GS-4 0.02739 GS-5 0.01918 NGVS 0.00000 CSLS 0.03822
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 16 Sebring Gas System The appropriate total conservation cost recovery factors for the period January 2025 through December 2025 are shown below: St. Joe’s Natural Gas Company The appropriate total conservation cost recovery factors for the period January 2025 through December 2025 are shown below: ISSUE 6: Should the Commission approve revised tariffs reflecting the natural gas conservation cost recovery factors determined to be appropriate in this proceeding? STIPULATION: Yes. The Commission should approve revised tariffs reflecting the new energy conservation cost factors determined to be appropriate in this proceeding. The Commission should direct staff to verify that the revised tariffs are consistent with the Commission’s decision. 2025 Conservation Cost Recovery Factors for Sebring Gas System, as reflected in Schedule C-1, Page 1 of 1, from Exhibit JLM-2 Rate Schedule Conservation Recovery Factor ($/therm) TS-1 0.13621 TS-2 0.05907 TS-3 0.03875 TS-4 0.03353 2025 Conservation Cost Recovery Factors for St. Joe’s Natural Gas Company, as reflected in Schedule C-1, Page 1 of 1, from Exhibit JLM-2 Rate Schedule Conservation Recovery Factor ($/therm) RS-1 0.33942 RS-2 0.23749 RS-3 0.18439 GS-1 0.10405 GS-2 0.06096 FTS4/GS-4 0.03724
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 17 ISSUE 7: What should be the effective date of the new conservation cost recovery factors for billing purposes? STIPULATION: The factors should be effective beginning with the specified conservation cost recovery cycle and thereafter for the period January 2025 through December 2025. Billing cycles may start before January 1, 2025 and the last cycle may be read after December 31, 2025, so that each customer is billed for twelve months regardless of when the adjustment factor became effective. ISSUE 8: Should this docket be closed? STIPULATION: No. While a separate docket number is assigned each year, this is a continuing docket and should remain open for administrative convenience. XI. PENDING MOTIONS There are no pending motions at this time. XII. PENDING CONFIDENTIALITY MATTERS There are no pending confidentiality matters at this time. XIII. POST-HEARING PROCEDURES If no bench decision is made, each party shall file a post-hearing statement of issues and positions. A summary of each position, set off with asterisks, shall be included in that statement. If a party’s position has not changed since the issuance of this Prehearing Order, the post-hearing statement may simply restate the prehearing position; however, if the prehearing position is longer than 75 words, it must be reduced to no more than 75 words. If a party fails to file a post- hearing statement, that party shall have waived all issues and may be dismissed from the proceeding. Pursuant to Rule 28-106.215, F.A.C., a party’s proposed findings of fact and conclusions of law, if any, statement of issues and positions, and brief, shall together total no more than 40 pages and shall be filed at the same time.
PSC-2024-0467-PHO-GU 31st October 2024 ORDER NO. DOCKET NO. 20240004-GU PAGE18 XlV. R UL INGS Opening statements, if any, shall not exceed three minutes per party. It is therefore, ORDERED by Commissioner Gabriella Passidomo, as Prehearing Officer, that this Prehearing Order shall govem the conduct of these proceedings as set forth above unless modified by the Commission. By ORDER of Commissioner Gabriella Passidomo, as Prehearing Officer, this __ day of --- ---- TPS Gabriella Passidomo Commissioner and Prehearing Officer Florida Public Service Commission 2540 Shumard Oak Boulevard Tallahassee, Florida 32399 (850) 413-6770 www.floridapsc.com Copies furnished: A copy of this document is provided to the parties of record at the time of issuance and, if applicable, interested persons.
ORDER NO. PSC-2024-0467-PHO-GU DOCKET NO. 20240004-GU PAGE 19 NOTICE OF FURTHER PROCEEDINGS OR JUDICIAL REVIEW The Florida Public Service Commission is required by Section 120.569(1), Florida Statutes, to notify parties of any administrative hearing or judicial review of Commission orders that is available under Sections 120.57 or 120.68, Florida Statutes, as well as the procedures and time limits that apply. This notice should not be construed to mean all requests for an administrative hearing or judicial review will be granted or result in the relief sought. Mediation may be available on a case-by-case basis. If mediation is conducted, it does not affect a substantially interested person's right to a hearing. Any party adversely affected by this order, which is preliminary, procedural or intermediate in nature, may request: (1) reconsideration within 10 days pursuant to Rule 25- 22.0376, Florida Administrative Code; or (2) judicial review by the Florida Supreme Court, in the case of an electric, gas or telephone utility, or the First District Court of Appeal, in the case of a water or wastewater utility. A motion for reconsideration shall be filed with the Office of Commission Clerk, in the form prescribed by Rule 25-22.0376, Florida Administrative Code. Judicial review of a preliminary, procedural or intermediate ruling or order is available if review of the final action will not provide an adequate remedy. Such review may be requested from the appropriate court, as described above, pursuant to Rule 9.100, Florida Rules of Appellate Procedure.
Ti chiedi come si applica questo testo alla tua situazione?
Consulenza gratuita, senza impegno
Descrivi la tua situazione. Il nostro team ti ricontatterà via e-mail per la tua consulenza.
Continua la tua ricerca in ChatGPT o Claude
Collega Omnilex per cercare nel corpus legale dal tuo assistente IA.