Federal Register final rules — 1996-03-11

issue-1996-03-11Federal Register final rules — 1996-03-11Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-5869 Telecommunications Act of 1996
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9648-9650]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5869]

-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION
47 CFR Part 76

[CS Docket No. 96-40; FCC 96-84]

Telecommunications Act of 1996

AGENCY: Federal Communications Commission.

ACTION: Interim rule.

-----------------------------------------------------------------------

SUMMARY: This Order establishes interim rules to implement Section 641 
of the Communications Act, including establishing the hours of the day 
when a significant number of children are likely to view sexually 
explicit adult programming or other indecent programming on any channel 
of the service of a multichannel video programming distributor 
primarily dedicated to sexually-oriented programming if such 
programming is not fully blocked or fully scrambled. Section 505 of the 
Telecommunications Act directs the Commission to establish these hours. 
In this Order, the Commission determines that the hours of 6 a.m. to 10 
p.m. are the hours when such programming may not be shown if not fully 
scrambled or fully blocked.

EFFECTIVE DATE: March 11, 1996.

FOR FURTHER INFORMATION, CONTACT: Meryl S. Icove, Cable Services 
Bureau, (202) 416-0800.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Order in CS Docket 
No. 96-40, FCC 96-84, adopted March 4, 1996 and released March 5, 1996. 
The complete text of this Order is available for inspection and copying 
during normal business hours in the FCC Reference Center (room 239), 
1919 M Street, NW., Washington, DC, and also may be purchased from the 
Commission's copy contractor, International Transcription Services, 
Inc. (``ITS Inc.'') at (202) 587-3800, 2100 M Street, NW., Suite 140, 
Washington, DC 20017.

Synopsis of Order

    1. On February 8, 1996, the Telecommunications Act of 1996 (``1996 
Act''), Pub. L. No. 104-104, 110 Stat. 56 (1996), was enacted. Section 
505 of the 1996 Act amends the Communications Act by adding a new 
Section 641, entitled ``Scrambling of Sexually Explicit Adult Video 
Service 

[[Page 9649]]
Programming.'' Section 641(a) requires that multichannel video 
programming distributors (``MVPDs'') fully scramble or fully block 
sexually explicit adult programming or other indecent programming on 
any channel of its service primarily dedicated to sexually-oriented 
programming so that a nonsubscriber does not receive such programming. 
Section 641(b) provides that, until the MVPD fully scrambles such 
programming, it may not provide such programming during the hours of 
the day when a significant number of children are likely to view such 
programming. Section 641(b) further requires that the Commission 
determine those hours. Section 641(c) also provides a definition of 
``scramble:'' ``to rearrange the content of the signal of the 
programming so that the programming cannot be viewed or heard in an 
understandable manner.'' These provisions take effect 30 days after the 
date of enactment of the 1996 Act, i.e., March 9, 1996. In this Order 
the Commission adopts a rule incorporating Section 641(a). The 
Commission also establishes an interim rule implementing Section 
641(b), providing that the programming described in subsection (a) may 
not be provided between the hours of 6 a.m. and 10 p.m. if not fully 
scrambled or fully blocked. The NPRM adopted with this Order on March 
4, 1996, requests comment on whether the interim rule should be adopted 
as a final rule. Finally, the NPRM requests comment on other issues 
regarding implementation and enforcement of these rules.
    2. We herein establish a rule incorporating the self-effectuating 
language of Section 641(a). We are adding this rule without providing 
prior public notice and comment because the rule simply incorporates a 
provision of the 1996 Act. The Commission's action involves no 
discretion. Accordingly, notice and comment would serve no purpose and 
is thus unnecessary, and this action falls within the ``good cause'' 
exception of the Administrative Procedure Act (``APA''). See 5 U.S.C. 
553(b)(B).
    3. We establish an interim rule implementing Section 641(b) 
regarding the hours during which MVPDs may not provide sexually 
explicit adult programming or other indecent programming on any channel 
primarily dedicated to sexually-oriented programming if it is not fully 
scrambled or fully blocked. We find that good cause exists to establish 
an interim rule without notice and comment because Section 641 takes 
effect 30 days after enactment of the 1996 Act, making it impracticable 
to engage in notice and comment procedures.
    4. This interim rule is based on a closely analogous, existing 
Commission rule. The Commission's current rule regarding broadcast 
indecency prohibits the licensee of a radio or television broadcast 
station from broadcasting between 6 a.m. and 10 p.m. any material which 
is indecent. 47 CFR 73.3999. This rule is based on an extensive 
administrative record and judicial review of the regulation of indecent 
programming. The United States Court of Appeals for the District of 
Columbia Circuit upheld a 10 p.m. to 6 a.m. safe harbor in Action for 
Children's Television v. FCC, and the United States Supreme Court 
denied certiorari. 58 F.3d 654 (D.C. Cir. 1995) (en banc), cert. 
denied, 64 USLW 3465 (Jan. 8, 1996). We are aware of no relevant 
differences here that would justify a different interim rule. 
Accordingly, based upon that closely related proceeding, we adopt an 
interim rule requiring that, until an MVPD complies with the 
scrambling/blocking requirement in new Section 641(a), the MVPD may not 
provide sexually explicit adult programming or other programming that 
is indecent on any channel of its service primarily dedicated to 
sexually-oriented programming between the hours of 6 a.m. and 10 p.m.
    5. We define ``indecent'' programming here on an interim basis the 
same as in other video programming contexts: any programming that 
describes or depicts sexual or excretory activities or organs in a 
patently offensive manner as measured by contemporary community 
standards for the cable or other MVPD medium. See Infinity Broadcasting 
Corporation of Pennsylvania, 2 FCC Rcd 2705 (1987); 47 CFR 
Secs. 76.701(g). We believe it is clear that the term ``sexually 
explicit adult programming'' in Section 641(a) is merely a subset of 
the term ``programming that is indecent.'' To the extent that this 
language could be viewed as ambiguous, we interpret it to include only 
indecent programming. As to the applicability of Section 641(a) only to 
channels ``primarily dedicated to sexually-oriented programming,'' we 
believe the statute is clear regarding what channels Section 641(a) 
applies to, but unless and until we adopt a definition of that term we 
will rely on the good faith judgment of MVPDs regarding its definition. 
We note that Section 641 only requires that MVPDs fully scramble or 
otherwise fully block the video and audio portion of channels primarily 
dedicated to sexually-oriented programming ``[i]n providing sexually 
explicit adult programming or other programming that is indecent.'' 
Thus, we interpret the provision as not requiring the scrambling of 
programming that is not indecent even if provided on a channel 
primarily dedicated to sexually-oriented programming.
    6. To the extent that compliance with Section 641 conflicts with 
any Commission rules requiring cable operators to give advance written 
notice to subscribers or local franchising authorities of certain 
changes in their service, those rules are waived. See 47 CFR 
Secs. 76.309(c)(3)(i)(B), 76.964. To the extent that compliance with 
Section 641 conflicts with any state or local notice requirements, 
those requirements are preempted by Section 641 itself, which requires 
that MVPDs make the programming changes within 30 days of the Section's 
enactment. Cable operators should, however, give notice as soon as is 
reasonably practicable. We understand that in some instances such 
notice may not be given until after the change has been made.

Ordering Clauses

    7. It is ordered that, pursuant to Sections 4(i) and 641 of the 
Communications Act of 1934, as amended, 47 U.S.C. 154(i), and Section 
505 of the Telecommunications Act of 1996, that the Commission's rules 
ARE AMENDED as set forth below. These rules are effective upon 
publication in the Federal Register. We find good cause for making 
these rules effective upon publication in the Federal Register because 
Section 641 becomes effective 30 days after enactment of the 
Telecommunications Act of 1996.
    8. It is further ordered that 47 CFR 76.309(c)(3)(i)(B) IS WAIVED 
to the extent indicated herein.
    9. It is further ordered that 47 CFR Sec. 76.964 IS WAIVED to the 
extent indicated herein.

Lists of Subjects in 47 CFR Part 76

    Cable television.

Amendatory Text

    Part 76 of Title 47 of the Code of Federal Regulations is amended 
to read as follows:

PART 76--[AMENDED]

    1. The authority citation of Part 76 continues to read as follows:

    Authority: Secs. 2, 3, 4, 301, 303, 307, 308, 309, 48 Stat. as 
amended, 1064, 1065, 1066, 1081, 1082, 1083, 1084, 1085, 1101; 47 
U.S.C. Secs. 152, 153, 154, 301, 303, 307, 308, 309, 532, 535, 542, 
543, 552 as amended, 106 Stat. 1460.

    2. A new Sec. 76.227 is added to Subpart G to read as follows: 
    
[[Page 9650]]

Sec. 76.227  Blocking of indecent sexually-oriented programming 
channels.

    (a) In providing sexually explicit adult programming or other 
programming that is indecent on any channel of its service primarily 
dedicated to sexually-oriented programming, a multichannel video 
programming distributor shall fully scramble or otherwise fully block 
the video and audio portion of such channel so that one not a 
subscriber to such channel or programming does not receive it.
    (b) Until a multichannel video programming distributor complies 
with the requirement set forth in paragraph (a) of this section, the 
multichannel video programming distributor shall not provide the 
programming referred to in paragraph (a) of this section between the 
hours of 6 a.m. and 10 p.m.
    (c) Scramble means to rearrange the content of the signal of the 
programming so that the programming cannot be viewed or heard in an 
understandable manner.
    (d) Sexually explicit adult programming or other programming that 
is indecent means any programming that describes or depicts sexual or 
excretory activities or organs in a patently offensive manner as 
measured by contemporary community standards for the cable or other 
multichannel video programming distribution medium.

Federal Communications Commission.
William F. Caton,

Acting Secretary.

[FR Doc. 96-5869 Filed 3-8-96; 8:45 am]
BILLING CODE 6712-01-P---------

Complete official Federal Register PDF

FR Doc. 96-5737 Approval and Promulgation of Implementation Plans; Ohio
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9644-9646]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5737]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[OH89-1-7254a; FRL-5434-7]

Approval and Promulgation of Implementation Plans; Ohio

AGENCY: United States Environmental Protection Agency (USEPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: This document approves a State Implementation Plan (SIP) 
revision for the State of Ohio for the general conformity rules. The 
general conformity SIP revisions enable the State of Ohio to implement 
and enforce the Federal general conformity requirements in the 
nonattainment or maintenance areas at the State or local level. General 
Conformity assures that federal actions conform to the State plan to 
attain and maintain the public health based air quality standards. The 
rationale for the approval and other information is provided in this 
document.

DATES: This action is effective May 10, 1996 unless adverse comments 
are received by April 10, 1996. If the effective date is delayed, 
timely notice will be published in the Federal Register.

ADDRESSES: Copies of the SIP revision are available for inspection at 
the following address: (It is recommended that you telephone Patricia 
Morris at (312) 353-8656 before visiting the Region 5 Office.) United 
States Environmental Protection Agency, Region 5, Air and Radiation 
Division, 77 West Jackson Boulevard, Chicago, Illinois 60604.

FOR FURTHER INFORMATION CONTACT: Patricia Morris, Regulation 
Development Section (AR-18J), Air Programs Branch, Air and Radiation 
Division, United States Environmental Protection Agency, Region 5, 77 
West Jackson Boulevard, Chicago, Illinois 60604, Telephone Number (312) 
353-8656.

SUPPLEMENTARY INFORMATION:

I. Background

    Conformity provisions first appeared in the Clean Air Act (CAA) 
amendments of 1977 (Pub. L. 95-95). Although these provisions did not 
define the term conformity, they provided that no Federal department 
could engage in, support in any way or provide financial assistance 
for, license or permit, or approve any activity which did not conform 
to a SIP that has been approved or promulgated for the nonattainment or 
maintenance areas.
    The CAA Amendments of 1990 expanded the scope and content of the 

[[Page 9645]]
conformity provisions by defining conformity to an implementation plan. 
Conformity is defined in Section 176(c) of the CAA as conformity to the 
SIP's purpose of eliminating or reducing the severity and number of 
violations of the National Ambient Air Quality Standards and achieving 
expeditious attainment of such standards, and that such activities will 
not: (1) Cause or contribute to any new violation of any standard in 
any area, (2) increase the frequency or severity of any existing 
violation of any standard in any area, or (3) delay timely attainment 
of any standard or any required interim emission reductions or other 
milestones in any area.
    The CAA requires USEPA to promulgate criteria and procedures for 
determining conformity of all other Federal actions in the 
nonattainment or maintenance areas (actions other than those under 
Title 23 U.S.C. or the Federal Transit Act ) to a SIP. The criteria and 
procedures developed for this purpose are called ``general conformity'' 
rules. The actions under Title 23 U.S.C. or the Federal Transit Act 
will be addressed in a separate Federal Register document. The USEPA 
published the final general conformity rules in the November 30, 1993, 
Federal Register and codified them at 40 CFR part 51, subpart W--
Determining Conformity of General Federal Actions to State or Federal 
Implementation Plans. The general conformity rules require the States 
and local air quality agencies (where applicable) to adopt and submit a 
general conformity SIP revision to the USEPA not later than November 
30, 1994.

II. Evaluation of State Submittal

    Pursuant to the requirements under Section 176(c)(4)(C) of the CAA, 
as amended November 15, 1990, the Ohio Environmental Protection Agency 
(OEPA) submitted a State Implementation Plan (SIP) revision to the 
USEPA on August 17, 1995. The submittal was found complete on October 
5, 1995. In its submittal, the State adopted rules (Ohio Administrative 
Code OAC 3745-102-01,-02,-03,-04,-05,-06,-07) which repeat verbatim the 
USEPA general conformity rule (40 CFR Part 93 Subpart B) with only 
minor clarifications. General conformity is required for all areas 
which are designated nonattainment or maintenance for any of the six 
National Ambient Air Quality Standard (NAAQS) criteria pollutants 
(ozone, carbon monoxide, sulfer dioxide, nitrogen dioxide, lead, and 
particulate matter).
    The OEPA held a public hearing on the general conformity submittal 
on May 25, 1995. No comments were received by OEPA during the public 
comment period. Before the public comment period, the OEPA also mailed 
a copy of the rules to government agencies located in Ohio which would 
be affected by the rules and requested comments on the rules.

III. USEPA Action

    The USEPA is approving the general conformity SIP revision for the 
State of Ohio. The EPA has evaluated this SIP revision and has 
determined that the State has fully adopted regulations which meet the 
provisions of the Federal general conformity rules in accordance with 
40 CFR Part 93 Subpart B. The appropriate public participation and 
comprehensive interagency consultations have been undertaken during 
development and adoption of this rule by the OEPA. As stated earlier, 
the OEPA held a public hearing on the general conformity submittal on 
May 25, 1995. No comments were received by OEPA during the public 
comment period.
    The USEPA considers this action noncontroversial and routine. 
Therefore, we are approving it without prior proposal. This action will 
become effective on May 10, 1996 unless USEPA receives adverse comments 
by April 10, 1996. However, if USEPA receives adverse comments by April 
10, 1996, USEPA will publish a document that withdraws this action.

IV. Miscellaneous

    A. Applicability to Future SIP Decisions
    Nothing in this action should be construed as permitting, allowing 
or establishing a precedent for any future request for revision to any 
SIP. The USEPA shall consider each request for revision to the SIP in 
light of specific technical, economic, and environmental factors and in 
relation to relevant statutory and regulatory requirements.
    B. Executive Order 12866
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget has exempted 
this regulatory action from E.O. 12866 review.
    C. Regulatory Flexibility
    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., USEPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities (5 U.S.C. 603 and 604). 
Alternatively, USEPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    This approval does not create any new requirements. Therefore, I 
certify that this action does not have a significant impact on any 
small entities affected. Moreover, due to the nature of the Federal-
State relationship under the Act, preparation of the regulatory 
flexibility analysis would constitute Federal inquiry into the economic 
reasonableness of the State action. The Act forbids USEPA to base its 
actions concerning SIPs on such grounds. Union Electric Co. v. U.S. 
E.P.A., 427 U.S. 246, 256-66 (1976).
    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, the 
USEPA must prepare a budgetary impact statement to accompany any 
proposed or final rule that includes a Federal mandate that may result 
in estimated costs to State, local, or tribal governments in the 
aggregate; or to the private sector, of $100 million or more. Under 
Section 205, the USEPA must select the most cost-effective and least 
burdensome alternative that achieves the objectives of the rule and is 
consistent with statutory requirements. Section 203 requires the USEPA 
to establish a plan for informing and advising any small governments 
that may be significantly or uniquely impacted by the rule.
    The USEPA has determined that the approval action promulgated today 
does not include a Federal mandate that may result in estimated costs 
of $100 million or more to either State, local, or tribal governments 
in the aggregate, or to the private sector.
    This Federal action approves pre-existing requirements under State 
or local law, and imposes no new Federal requirements. Accordingly, no 
additional costs to State, local, or tribal governments, or the private 
sector, result from this action.
    D. Petitions for Judicial Review
    Under Section 307(b)(1) of the Act, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by May 10, 1996. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this rule for the purposes of judicial review, nor does 
it extend the time within which a petition for judicial review may be 
filed and 

[[Page 9646]]
shall not postpone the effectiveness of such rule or action. This 
action may not be challenged later in proceedings to enforce its 
requirements (see Section 307(b)(2)).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, General conformity.
    Dated: February 12, 1996.
David A. Ullrich,
Acting Regional Administrator.
    40 CFR part 52, is amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:
    Authority: 42 U.S.C 7401-7671q.

Subpart KK--Ohio

    2. Section 52.1870 is amended by adding paragraph (c) (107) to read 
as follows:

Sec. 52.1870  Identification of plan.

* * * * *
    (c) * * *
    (107) Approval--On August 17, 1995, the Ohio Environmental 
Protection Agency submitted a revision to the State Implementation Plan 
for general conformity rules. The general conformity rules enable the 
State of Ohio to implement and enforce the Federal general conformity 
requirements in the nonattainment or maintenance areas at the State or 
local level in accordance with 40 CFR part 93, subpart B--Determining 
Conformity of General Federal Actions to State or Federal 
Implementation Plans.
    (i) Incorporation by reference. August 1, 1995, Ohio Administrative 
Code Chapter 3745-102, effective August 21, 1995.
[FR Doc. 96-5737 Filed 3-8-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-5735 Approval and Promulgation of State Implementation Plan; Wisconsin; Clean-Fuel Fleet Program
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9639-9642]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5735]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[WI64-01-7148a; FRL-5416-8]

Approval and Promulgation of State Implementation Plan; 
Wisconsin; Clean-Fuel Fleet Program

AGENCY: United States Environmental Protection Agency (USEPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: In this action, U.S. Environmental Protection Agency (USEPA) 
is approving a revision to the Wisconsin State Implementation Plan 
(SIP) for the purpose of establishing a Clean-Fuel Fleet Program. 
Wisconsin submitted the SIP revision request to satisfy a federal 
mandate, found in the Clean Air Act, requiring certain states to 
establish Clean-Fuel Fleet Programs. This revision establishes and 
requires the implementation of a Clean-Fuel Fleet Program in the 
Milwaukee ozone nonattainment area.

DATES: This ``direct final'' rule is effective May 10, 1996, unless 
USEPA receives adverse or critical comments by April 10, 1996. If the 
effective date is delayed, timely notice will be published in the 
Federal Register.

ADDRESSES: Comments may be mailed to: Carlton T. Nash, United States 
Environmental Protection Agency, Region 5, Air and Radiation Division, 
Air Programs Branch (AP-18J), 77 West Jackson Boulevard, Chicago, 
Illinois, 60604.
    Copies of the documents relevant to this action are available at 
the above address for public inspection during normal business hours.

FOR FURTHER INFORMATION CONTACT: Brad J. Beeson at (312) 353-4779.

SUPPLEMENTARY INFORMATION:

I. Background

    On November 15, 1990, Congress enacted amendments to the 1977 Clean 
Air Act (CAA), codified at 42 U.S.C. 7401-7671q. The Clean-Fuel Fleet 
Program (CFFP) is contained under Part C, entitled ``Clean Fuel 
Vehicles,'' of Title II of the Clean Air Act. Part C was added to the 
CAA to establish two programs, a clean-fuel vehicle pilot program in 
the state of California (the California Pilot Test Program) and a 
federal CFFP in certain ozone and carbon monoxide (CO) nonattainment 
areas.
    The CFFP will introduce lower pollution emitting vehicles, ``clean-
fuel vehicles'' (CFVs), into centrally-fueled fleets by requiring 
covered fleet operators to include a percentage of CFVs in their new 
fleet purchases. The goal of the CFFP is to reduce emissions of non-
methane organic gasses (NMOG), oxides of nitrogen (NOx), and CO through 
the introduction of CFVs into the covered areas. Both NMOG and NOx are 
precursors of ozone and, in most areas, their reduction will reduce the 
concentration of ozone in covered ozone nonattainment areas. Reductions 
of vehicular CO emissions will reduce the 

[[Page 9640]]
concentration of CO in covered CO nonattainment areas.
    Congress chose centrally-fueled fleets because operators of these 
fleets have more control over obtaining fuel than the general public. 
Additionally, the control that operators maintain over their fleets 
simplifies maintenance and refueling of these vehicles. Finally, 
because fleet vehicles typically travel more miles on an annual basis 
than do non-fleet vehicles, they provide greater opportunity to improve 
air quality on a per vehicle basis.
    Section 182(c)(4) of the CAA allows states to opt-out of the CFFP 
by submitting, for EPA approval, a SIP revision consisting of a 
substitute program resulting in as much or greater long term emission 
reductions in ozone producing and toxic air emissions as the CFFP. The 
EPA may approve such a revision ``only if it consists exclusively of 
provisions other than those required under the [CAA] for the area.''

II. Program Requirements

    Unless a state chooses to opt-out of the CFFP under section 
182(c)(4) of the CAA, section 246 of the CAA directs a state containing 
covered areas to revise its SIP, within 42 months after enactment of 
the CAA, to establish a CFFP. The CFFP shall require a specified 
percentage of all newly acquired vehicles of covered fleets, beginning 
with model year (MY) 1998 and thereafter, to be CFVs and such vehicles 
shall use the fuel on which the vehicle was certified to be a CFV (or 
to use a fuel that will result in even fewer emissions than the fuel 
that was used for certification), when operating in the covered area.

III. State Submittal

    The state of Wisconsin did not choose to opt-out of the CFFP 
pursuant to section 182(c)(4) of the CAA and, therefore, submitted a 
SIP revision on May 12, 1994, to implement a CFFP. However, because 
this submittal did not include a fully adopted rule establishing a 
CFFP, EPA deemed the submittal incomplete. On June 7, 1995, the state 
made a supplemental submittal that included a fully adopted CFFP rule. 
On July 20, EPA determined that the state's SIP submittal for a CFFP 
was complete.

IV. EPA's Analysis of the State's Clean Fuel Fleet Program

    EPA has reviewed the state's submittal for consistency with the 
requirements of EPA regulations. A summary of EPA's analysis is 
provided below. More detailed support for approval of the state's 
submittal is contained in a Technical Support Document (TSD), dated 
September 6, 1995, which is available from the Region 5 Office, listed 
above.

A. Covered Areas

    The SIP revision needs to list those areas where the CFFP will be 
implemented, as required by section 246(a)(2) of the CAA. In Wisconsin, 
the applicable areas defined by section 246(a)(2) include Kenosha, 
Milwaukee, Ozaukee, Racine, Washington, and Waukesha counties.
    Section NR 487.01(1) of the Wisconsin Administrative Code defines 
the covered area to include Kenosha, Milwaukee, Ozaukee, Racine, 
Washington, and Waukesha counties. These are the same counties as 
required by the CAA.

B. Definitions

    Sections 241(1) to (7) of the CAA, and 40 CFR 88.302-94, define 
specific terms that are to be used in the state regulations.
    NR 487.02 contains definitions of the terms used by Wisconsin in 
the CFFP rule. The revision's definitions are consistent with section 
241(1) to (7) of the CAA as well as 40 CFR 88.302-94.

C. Covered Fleets

    Section 241(5) of the CAA defines a ``covered fleet'' as 10 or more 
motor vehicles that are owned or operated by a single person.
    NR 487.01(1) and 487.02, taken together, identify the vehicles/
fleets that are included in Wisconsin's CFFP, and are consistent with 
section 241(5) of the CAA.

D. Vehicles Classes Covered

    Sections 242 and 243 of the CAA and 40 CFR part 88, subpart C, 
define the vehicle classes covered by the CFFP. Additionally, section 
245(a) of the CAA exempts from the CFV standards vehicles having a 
Gross Vehicle Weight Rating (GVWR) of more than 26,000 pounds.
    NR 487.02(6) and (7) define the vehicle classes covered by the 
Wisconsin CFFP. The classes of vehicles included in the Revision are 
identical to those set forth in sections 242 and 243 of the CAA and 40 
CFR part 88, subpart C, including the 26,000 pound GVWR exemption.

E. Clean-Fuel Vehicles (CFVs)

    Section 241(7) of the CAA defines a CFV to mean a vehicle in a 
class or category of vehicles that has been certified to meet for any 
model year the applicable CFV standards. 40 CFR 88.104-94 and 40 CFR 
88.306-94 establish three categories of increasingly stringent CFV 
standards, which are referred to as low-emission vehicle (LEV) 
standards, ultra low-emission vehicle (ULEV) standards, and zero-
emission vehicle (ZEV) standards. In addition, a vehicle certified by 
the EPA to meet the inherently low-emission vehicle (ILEV) standard, 
found in 40 CFR 88.311-93, is also considered a CFV.
    NR 487.02(6) defines a CFV as a vehicle which has been certified to 
meet, for any model year, a set of emission standards, contained in 
Table I of the CFFP rule. The standards specified in the rule are the 
same as those established in 40 CFR 88.104-94, 40 CFR 88.311-93, and 40 
CFR 88.306-944.

F. Percentage Requirements

    Section 246(b) of the CAA establishes phase-in requirements for 
covered fleets applicable to new vehicle acquisitions.
    NR 487.03 contains the CFV purchase requirements for the 
Wisconsin's CFFP. The phase-in schedule in Wisconsin's rule is 
identical to the schedule in the CAA.

G. Credit Program

    Section 246(f) of the CAA and 40 CFR 88.304-94 require the state to 
implement a credit program as part of the CFFP. Briefly, the Clean-Fuel 
Fleet (CFF) credit program establishes a market-based mechanism that 
allows fleet owners some flexibility in complying with the CFF purchase 
requirement. Fleet owners may meet the purchase requirements in any of 
several ways: (1) By the purchase of more CFVs than the minimum 
required by a CFFP; (2) by the purchase of CFVs which meet more 
stringent emission standards than the minimum required by the CFFP; (3) 
by the purchase of CFVs otherwise exempt from the CFFP; and (4) by the 
purchase of CFVs before MY 1998.
    The credits generated may be used by a covered fleet operator to 
satisfy the purchase requirements of a CFFP or may be traded by one 
covered fleet operator to another, provided the credits were generated 
and used in, and both operators are located in, the same nonattainment 
area. Certain restrictions on the trading of the credits between 
classes must be observed. The credits do not depreciate with time and 
are to be freely traded without interference by the state.
    NR 487.09 establishes a credit program that provides credits for 
operators who: (1) acquire more CFVs than the Wisconsin CFFP requires 
in any year; (2) acquire CFVs which meet more stringent emission 
standards than the minimum requirements; (3) acquire 

[[Page 9641]]
CFVs in exempted vehicle categories; or (4) acquire CFVs after November 
15, 1990, but prior to MY 1998. These eligibility requirements are 
consistent with section 246(f) of the CAA.
    NR 487 includes Tables 3, 4, 6, and 7, which set forth the amount 
of credit granted for the various ways of meeting the purchasing 
requirements explained above. These tables are identical to Tables C94-
2, C94-2.2, C94-4, and C94-4.2 of 40 CFR part 88, subpart C.
    The revision requires credits for LDV and HDV to be kept separate. 
Trading of credits between LDV and LDT is permitted. However, trading 
is not allowed between HDV and LDV or LDT or in an upward direction. 
These limitations and restrictions are consistent with those specified 
in section 246(f)(2) of the CAA.

H. Fuel Use

    40 CFR 88.304-94(b)(3) requires that the fuel on which a dual fuel/
flexible fuel CFV was certified to be used at all times when the 
vehicle is in the covered area.
    NR 487.03(3) requires that for any dual-fuel/hybrid electric 
vehicle to be considered a CFV (and therefore capable of generating 
credit), the vehicle must be operated, while in the covered area, on 
the fuel or power source, for which it was certified to meet applicable 
emission standards.

I. Fuel Availability

    Section 246(e) of the CAA requires the SIP revision to require fuel 
providers to make clean alternative fuel available to the covered 
fleets at central locations.
    NR 487.12 requires fuel providers to make clean alternative fuels 
available to covered fleet operators at central locations where 
technically and economically feasible.

J. Consultation

    Section 246(a)(4) of the CAA requires that the SIP revision must be 
developed in consultation with fleet operators, vehicle manufacturers, 
fuel producers, distributors of motor vehicle fuel, and other 
interested parties, taking into consideration operational range, 
specialty uses, vehicle and fuel availability, costs, safety, resale 
values, and other relevant factors.
    The Wisconsin Department of Natural Resources (WDNR) organized a 
consultation committee, called the Clean-Fuel Fleet Committee. The 
Committee met several times and included representatives from fleet 
owners, fleet operators, fuel providers, and environmentalists. The 
Committee took into consideration the factors specified in section 
246(a)(4) of the CAA.

K. Recordkeeping and Monitoring

    No specific recordkeeping and monitoring requirements are found in 
section 246 of the CAA or 40 CFR 88.304-94. However, EPA ensures that a 
number of questions are answered in order to determine the adequacy of 
a CFFP. 60 FR 54305 (Oct. 23, 1995).
    (1) Does the SIP revision provide a reasonable process for the 
state to determine which fleets should report data to the state, 
consistent with the state's approach to ``operated in the covered 
area''?
    (2) Is there a process for updating this list of potentially 
covered fleet operators?
    (3) Does the SIP revision include a process for the state agency to 
receive at least the following data from fleet operators:
    (a) Numbers, categories, and fueling patterns of vehicles in the 
fleet?
    (b) Numbers, engine family names, categories, and fueling patterns 
of new acquisitions?
    (c) Numbers, engine family names, categories, and fueling patterns 
of CFV acquisitions?
    (d) For dual-fuel/flexible-fuel vehicles, data on fuel usage 
sufficient to demonstrate that the proper fuel was used when the 
vehicle was operated in the covered area?
    (4) Does the SIP revision describe how the data will be processed, 
maintained, updated, and used to confirm compliance by fleets?
    (5) Does the SIP revision provide for oversight of the data 
acquisition process?
    Information and actions responsive to these questions are provided 
as follows:
    NR 487.05 requires any person who operates a fleet of 10 or more 
CFVs to register with the WDNR.
    NR 487.05 also requires the registration to include some 
information responsive to the questions above. In addition, NR 487.06 
requires covered fleet operators to submit annual compliance plans to 
WDNR. All information required in 3(a) to 3(d) above, as well as other 
information, is included in these requirements. The information is 
reported on balance sheets and item sheets which allows the WDNR to 
monitor the performance of the operators. WDNR will review the annual 
compliance plans for approval or disapproval in keeping with NR 487.08.

L. Enforcement

    The state must be able to adequately enforce the requirements of 
the regulations adopted for implementation of the CFFP. 60 FR 54305 
(Oct. 23, 1995).
    NR 487.14 is the enforcement section of the Wisconsin CFFP. This 
section states that fleet operators are subject to WDNR enforcement 
procedures and penalties if they fail to comply with any requirement of 
NR 487.

M. Transportation Control Measure Exemptions

    40 CFR 88.307-94(a) requires states to exempt any CFV, required by 
law to participate in a CFFP, from temporal-based (e.g., time-of-day or 
day-of-week) transportation control measures (TCM) existing for air 
quality reasons as long as the exemption does not create a clear and 
direct safety hazard. In the case of high occupancy vehicle (HOV) 
lanes, this exemption only applies to CFVs that are certified to be 
ILEVs pursuant to 40 CFR 88.313-93.
    NR 487.10 exempts CFVs from temporal based TCMs as long as the CFV 
is in compliance with applicable emission standards. In addition, NR 
487.10(3) specifically exempts ILEVs from HOV restrictions. These TCM 
restrictions are consistent with those provided for in 40 CFR 88.307-94 
and 40 CFR 88.313-93.

N. Concluding Statement

    The EPA has reviewed the Wisconsin CFFP SIP revision submitted to 
the EPA as described above. The materials contained in the SIP revision 
represent an acceptable approach to the CFFP requirements and meet all 
the criteria required for approvability.

V. Action

    The EPA approves Wisconsin's CFFP SIP submittal. With this action, 
EPA incorporates Wisconsin's CFFP SIP revision into the SIP, making it 
federally enforceable.
    Because EPA considers this action noncontroversial and routine, we 
are approving it without prior proposal. This action will become 
effective on May 10, 1996. However, if we receive significant adverse 
comments by April 10, 1996, EPA will publish a document that modifies 
or withdraws this action.

VI. Miscellaneous

A. Applicability to Future SIP Decisions

    Nothing in this action should be construed as permitting, allowing 
or establishing a precedent for any future request for revision to any 
SIP. The EPA shall consider each request for revision to the SIP in 
light of specific technical, economic, and environmental factors and in 
relation to relevant statutory and regulatory requirements. 

[[Page 9642]]

B. Executive Order 12866
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget has exempted 
this regulatory action from E.O. 12866 review.
C. Regulatory Flexibility
    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities (5 U.S.C. 603 and 604). 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    This approval does not create any new requirements. Therefore, I 
certify that this action does not have a significant impact on any 
small entities affected. Moreover, due to the nature of the federal-
state relationship under the Act, preparation of the regulatory 
flexibility analysis would constitute federal inquiry into the economic 
reasonableness of the state action. The Act forbids EPA to base its 
actions concerning SIPs on such grounds. Union Electric Co. v. U.S. 
E.P.A., 427 U.S. 246, 256-66 (1976).
    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, the EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a federal mandate that may result in estimated 
costs to state, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under Section 205, the EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires the EPA to establish a 
plan for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    The EPA has determined that the approval action promulgated today 
does not include a federal mandate that may result in estimated costs 
of $100 million or more to either state, local, or tribal governments 
in the aggregate, or to the private sector.
    This federal action approves pre-existing requirements under state 
or local law, and imposes no new federal requirements. Accordingly, no 
additional costs to state, local, or tribal governments, or the private 
sector, result from this action.
D. Petitions for Judicial Review
    Under section 307(b)(1) of the Act, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by May 10, 1996. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this rule for the purposes of judicial review, nor does 
it extend the time within which a petition for judicial review may be 
filed and shall not postpone the effectiveness of such rule or action. 
This action may not be challenged later in proceedings to enforce its 
requirements (see section 307(b)(2)).
List of Subjects in 40 CFR Part 52
    Environmental protection, Air pollution control, Hydrocarbons, 
Incorporation by reference, Intergovernmental relations, Ozone, Motor 
vehicle pollution, Reporting and recordkeeping requirements.

    Dated: January 17, 1996.
Valdas V. Adamkus,
Regional Administrator.
    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:
PART 52--[AMENDED]
    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.
Subpart YY--Wisconsin
    2. Section 52.2570 is amended by adding paragraph (c)(87) to read 
as follows:

Sec. 52.2570  Identification of plan.

* * * * *
    (c) * * *
    (87) The state of Wisconsin requested a revision to the Wisconsin 
State Implementation Plan (SIP). This revision is for the purpose of 
establishing and implementing a Clean-Fuel Fleet Program to satisfy the 
federal requirements for a Clean Fuel Fleet Program to be part of the 
SIP for Wisconsin.
    (i) Incorporation by reference.
    (A) Chapter 487 of the Wisconsin Administrative Code, effective 
June 1, 1995.
    (B) Wisconsin Statutes, section 144.3714, enacted on April 30, 
1992, by Wisconsin Act 302.

* * * * *
[FR Doc. 96-5735 Filed 3-8-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-5733 Approval and Promulgation of Implementation Plans; State of Missouri
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9642-9644]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5733]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[MO-30-1-7152a; FRL-5424-7]

Approval and Promulgation of Implementation Plans; State of 
Missouri
AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: By this action the EPA gives conditional approval to the State 
Implementation Plan (SIP) submitted by the state of Missouri for the 
purpose of fulfilling the requirements set forth in the EPA's General 
Conformity rule. The SIP was submitted by the state to satisfy the 
Federal requirements in 40 CFR 51.852 and 93.151.

DATES: This action will be effective May 10, 1996, unless by April 10, 
1996, adverse or critical comments are received.

ADDRESSES: Copies of the documents relevant to this action are 
available for public inspection during normal business hours at the: 
Environmental Protection Agency, Air Planning and Development Branch, 
726 Minnesota Avenue, Kansas City, Kansas 66101; and EPA Air & 
Radiation Docket and Information Center, 401 M Street, SW., Washington, 
DC 20460.

FOR FURTHER INFORMATION CONTACT: Lisa V. Haugen at (913) 551-7877.
SUPPLEMENTARY INFORMATION:
I. Background
    Section 176(c) of the Clean Air Act (CAA), as amended (the Act), 
requires the EPA to promulgate criteria and procedures for 
demonstrating and ensuring conformity of Federal actions to an 
applicable implementation plan developed pursuant to section 110 and 
Part D of the Act. Conformity to an SIP is defined in the Act as 
meaning conformity to an SIP's purpose of eliminating or reducing the 
severity and number of violations of the National Ambient Air Quality 
Standards (NAAQS) and achieving expeditious attainment of such 
standards. The Federal agency responsible for the action is required to 
determine if its actions conform to the applicable SIP. On November 30, 
1993, EPA promulgated the final rule (hereafter referred to as the 
General Conformity rule), which establishes the criteria and

[[Page 9643]]

procedures governing the determination of conformity for all Federal 
actions, except Federal highway and transit actions.
    The St. Louis area was designated nonattainment for ozone and 
carbon monoxide (CO) in 1978. On November 6, 1991, EPA promulgated a 
rule which classified the St. Louis area as a moderate ozone 
nonattainment area, and as an unclassified nonattainment area for CO. 
In this same rulemaking, EPA promulgated nonattainment designations for 
three areas in Missouri which failed to achieve the NAAQS for lead. The 
nonattainment areas are identified as portions of Iron County, 
Missouri, in the vicinity of the Asarco primary lead smelting facility; 
the area surrounding the Doe Run primary/secondary lead smelter-
refinery installation near Boss, Missouri; and the area in the vicinity 
of the Doe Run primary lead smelter in Herculaneum, Missouri. Kansas 
City was redesignated to attainment for ozone, and a maintenance plan 
was approved, in a June 23, 1992, Federal Register notice. Section 
51.851 (93.151) of the General Conformity rule requires that states 
submit an SIP revision containing the criteria and procedures for 
assessing the conformity of Federal actions to the applicable SIP, 
within 12 months after November 30, 1993. As the rule applies to all 
nonattainment areas and maintenance areas, an SIP revision which 
addresses the requirements of the General Conformity rule became due on 
November 30, 1994.

II. Review of State Submittal

    On February 14, 1995, the state of Missouri submitted a General 
Conformity SIP revision. The submission included Missouri rule 10 CSR 
10-6.300 (10-6.300), which applies to all areas in the state of 
Missouri which are designated as nonattainment or maintenance for any 
criteria pollutant or standard for which there is an NAAQS. The General 
Conformity rule establishes the criteria for EPA approval of SIPs. See 
40 CFR 51.851 and 93.151. These criteria provide that the state 
provisions must be at least as stringent as the requirements specified 
in EPA's General Conformity rule, and that they can be more stringent 
only if they apply equally to Federal and nonfederal entities.
    The state of Missouri chose to use the model General Conformity 
rule developed by the State and Territorial Air Pollution Program 
Administrators (STAPPA)/Association of Local Air Pollution Control 
Officials (ALAPCO). The STAPPA/ALAPCO model rule added clarifying 
changes consistent with the intent of the Federal rule. The STAPPA/
ALAPCO rule also contains ``more stringent'' and ``lateral'' options 
which change the substance of the Federal rule. Missouri did not adopt 
any of these options from the model rule.
    Missouri rule 10 CSR 10-6.300 was adopted by the Missouri Air 
Conservation Commission, after proper notice and public hearing, on 
January 12, 1995, and became effective on May 28, 1995. The rule 
applies to all areas in the state of Missouri which are designated as 
nonattainment or maintenance for any criteria pollutant or standard for 
which there is an NAAQS.

III. Conditional Approval

    EPA has determined that SIP revisions which use, verbatim, the 
model rule developed by STAPPA/ALAPCO are not approvable. Two sentences 
added by STAPPA/ALAPCO as clarifying language make the model rule more 
stringent than the Federal General Conformity rule. Missouri rules 10 
CSR 10-6.300(3)(C)4 and (9)(B)2 include this language. EPA did not make 
a determination as to the approvability of the language in the STAPPA/
ALAPCO rule until after the state of Missouri officially submitted the 
required SIP revision. However, in a letter dated December 7, 1995, 
from David Shorr, Director, Missouri Department of Natural Resources 
(MDNR), to Dennis Grams, Regional Administrator, EPA, the state has 
committed to change the unapprovable sections and resubmit the SIP 
revision, within one year from December 7, 1995.
    Under section 110(k)(4) of the Act, EPA may grant a conditional 
approval of this revision based on the state's commitment to correct 
deficiencies by a date certain, but not later than one year after the 
date of approval of the plan revision. Furthermore, section 110(k)(4) 
of the Act states that, should the state fail to meet its commitment, 
this conditional approval will convert to a disapproval. As the state 
has committed to correct this SIP revision within one year from 
December 7, 1995, EPA grants a conditional approval of the state's 
submittal.

EPA ACTION

    By this action, EPA grants conditional approval of Missouri's 
February 14, 1995, submittal. This SIP revision substantially meets the 
requirements set forth in 40 CFR 51.851 and 93.151, except as noted 
above.
    The EPA is publishing this action without prior proposal because 
the Agency views this as a noncontroversial amendment and anticipates 
no adverse comments. However, in a separate document in the Federal 
Register publication, the EPA is proposing to approve the SIP revision 
should adverse or critical comments be filed.
    If the EPA receives such comments, this action will be withdrawn 
before the effective date by publishing a subsequent document that will 
withdraw the final action. All public comments received will then be 
addressed in a subsequent final rule based on this action serving as a 
proposed rule. The EPA will not institute a second comment period on 
this action. Any parties interested in commenting on this action should 
do so at this time.
    Nothing in this action should be construed as permitting or 
allowing or establishing a precedent for any future request for 
revision to any SIP. Each request for revision to the SIP shall be 
considered separately in light of specific technical, economic, and 
environmental factors, and in relation to relevant statutory and 
regulatory requirements.
    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities (5 U.S.C. 603 and 604). 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    Conditional approvals of SIP submittals under section 110 and 
subchapter I, Part D of the CAA do not create any new requirements, but 
simply approve requirements that the state is already imposing. 
Therefore, because the Federal SIP approval does not impose any new 
requirements, EPA certifies that it does not have a significant impact 
on any small entities affected. Moreover, due to the nature of the 
Federal-state relationship under the CAA, preparation of a regulatory 
flexibility analysis would constitute Federal inquiry into the economic 
reasonableness of state action. The CAA forbids EPA to base its actions 
concerning SIPs on such grounds (Union Electric Co. v. U.S. E.P.A., 427 
U.S. 246, 256-66 (S.Ct. 1976); 42 U.S.C. 7410(a)(2)).
    If the conditional approval is converted to a disapproval under 
section 110(k), based on the state's failure to meet the commitment, it 
will not affect any existing state requirements applicable to small 
entities. Federal disapproval of the state submittal does not affect 
its state enforceability. Moreover, EPA's 

[[Page 9644]]
disapproval of the submittal does not impose a new Federal requirement. 
Therefore, EPA certifies that this disapproval action does not have a 
significant impact on a substantial number of small entities, because 
it does not remove existing state requirements or substitute a new 
Federal requirement.
    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989, (54 FR 2214-2225), as revised by 
a July 10, 1995, memorandum from Mary Nichols, Assistant Administrator 
for Air and Radiation. The Office of Management and Budget has exempted 
this regulatory action from E.O. 12866 review.

Unfunded Mandates

    Under sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector, or to 
state, local, or tribal governments in the aggregate.
    Through submission of this SIP, the state has elected to adopt the 
program provided for under section 110 of the CAA. These rules may bind 
state and local governments to perform certain actions and also require 
the private sector to perform certain duties. To the extent that the 
rules being finalized for approval by this action will impose new 
requirements, sources are already subject to these regulations under 
state law. Accordingly, no additional costs to state or local 
governments, or to the private sector, result from this final action. 
The EPA has also determined that this final action does not include a 
mandate that may result in estimated costs of $100 million or more to 
state or local governments in the aggregate or to the private sector. 
EPA has determined that these rules result in no additional costs to 
tribal government.
    Under section 307(b)(1) of the CAA, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by May 10, 1996. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this rule for the purposes of judicial review, nor does 
it extend the time within which a petition for judicial review may be 
filed, and shall not postpone the effectiveness of such rule or action. 
This action may not be challenged later in proceedings to enforce its 
requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Incorporation by reference, Intergovernmental relations, Lead, Ozone, 
Reporting and recordkeeping requirements, Volatile organic compounds.

    Dated: February 6, 1996.
Dennis Grams,
Regional Administrator.
    Part 52, chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--[AMENDED]

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401-7671q.

Subpart AA--Missouri

    2. Section 52.1320 is amended by adding paragraph (c)(93) to read 
as follows:

Sec. 52.1320  Identification of plan.

* * * * *
    (c) * * *
    (93) On February 14, 1995, the Missouri Department of Natural 
Resources (MDNR) submitted a new rule which pertains to general 
conformity.
    (i) Incorporation by reference.
    (A) New rule 10 CSR 10-6.300, entitled Conformity of General 
Federal Actions to State Implementation Plans, effective May 28, 1995.
    3. Section 52.1323 is amended by adding paragraph (h) to read as 
follows:

Sec. 52.1323  Approval Status.

* * * * *
    (h) The state of Missouri commits to revise 10 CSR 6.300 to remove 
language in paragraphs (3)(C)4. and (9)(B) which is more stringent than 
the language in the Federal General Conformity rule. In a letter to Mr. 
Dennis Grams, Regional Administrator, EPA, dated December 7, 1995, Mr. 
David Shorr, Director, MDNR, stated:

    We commit to initiating a change in the wording in the above 
paragraphs [paragraphs (3)(C)4. and (9)(B)] of Missouri rule 10 CSR 
10-6.300, and to submit the change to EPA within one year from the 
date of this letter [December 7, 1995]. We intend that the change 
will give our rule the same stringency as the General Conformity 
Rule.

[FR Doc. 96-5733 Filed 3-8-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-5728 Withholding on Distributions of Indian Gaming Profits to Tribal Members; Correction
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Page 9639]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5728]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Internal Revenue Service

26 CFR Part 31

[TD 8634]
RIN 1545-AT11

Withholding on Distributions of Indian Gaming Profits to Tribal 
Members; Correction

AGENCY: Internal Revenue Service, Treasury.

ACTION: Correction to final regulations.

-----------------------------------------------------------------------

SUMMARY: This document contains a correction to final regulations [TD 
8634] which were published in the Federal Register for Tuesday, 
December 19, 1995 (60 FR 65237). The final regulations relate to the 
income tax withholding requirement on distributions of profits from 
certain gaming activities made to members of Indian tribes.

EFFECTIVE DATE: December 19, 1995.

FOR FURTHER INFORMATION CONTACT: Rebecca Wilson (202) 622-6040 (not a 
toll-free number).

SUPPLEMENTARY INFORMATION:

Background

    The final regulations that are the subject to this correction are 
under section 3402 of the Internal Revenue Code.

Need for Correction

    As published, TD 8634 contains an error that is in need of 
clarification.

Correction of Publication

    Accordingly, the publication of final regulations which are the 
subject of FR Doc. 95-30683, is corrected as follows:
    On page 65237, column one, in the heading, the ``RIN'' ``1545-
AT12'' is corrected to read ``1545-AT11''.
Cynthia E. Grigsby,
Chief, Regulations Unit, Assistant Chief Counsel (Corporate).
[FR Doc. 96-5728 Filed 3-8-96; 8:45 am]
BILLING CODE 4830-01-U

Complete official Federal Register PDF

FR Doc. 96-5726 Operating Requirements: Domestic, Flag, Supplemental, Commuter, and On-Demand Operations: Editorial and Terminology Changes
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9612-9613]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5726]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 121

[Docket No. 28154; Amendment No. 121-254]
RIN 2120-AC79

Operating Requirements: Domestic, Flag, Supplemental, Commuter, 
and On-Demand Operations: Editorial and Terminology Changes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: This amendment corrects an error in a document published on 
January 26, 1996 (61 FR 2608), which removed Sec. 121.404. The FAA 
intended to remove the version of Sec. 121.404 that was effective 
before December 20, 1995, and not the revision of Sec. 121.404 
published on December 20, 1995 (60 FR 65948). Therefore, the version of 
Sec. 121.404 that was published on December 20, 1995, is reinstated in 
this document.

EFFECTIVE DATE: March 11, 1996.

FOR FURTHER INFORMATION CONTACT:
Linda Williams, Office of Rulemaking (ARM-100); Federal Aviation 
Administration, 800 Independence Avenue SW., Washington, DC 20591; 
telephone (202) 267-9685.

The Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration amends the Federal Aviation Regulations (14 CFR part 
121) as follows:

PART 121--OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL 
OPERATIONS

    1. The authority citation for part 121 continues to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40113, 40119, 44101, 44701-44702, 
44705, 44709-44711, 44713, 44716-44717, 44722, 44901, 44903-44904, 
44912, 46105.

    2. Section 121.404 is added to read as follows:
    
[[Page 9613]]

Sec. 121.404  Compliance dates: Crew and dispatcher resource management 
training.

    After March 19, 1988, no certificate holder may use a person as a 
flight crewmember, and after March 19, 1999, no certificate holder may 
use a person as a flight attendant or aircraft dispatcher unless that 
person has completed approved crew resource management (CRM) or 
dispatcher resource management (DRM) initial training, as applicable, 
with that certificate holder or with another certificate holder.

    Issued in Washington, D.C., on March 4, 1996.
Donald P. Byrne,
Assistant Chief Counsel.
[FR Doc. 96-5726 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-5724 Amendment of Class E Airspace; Hanford, CA
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9611-9612]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5724]

      
-----------------------------------------------------------------------

[[Page 9612]]

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-AWP-45]

Amendment of Class E Airspace; Hanford, CA

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action amends the Class E airspace area at Hanford, CA. 
The development of a Global Positioning System (GPS) Standard 
Instrument Approach Procedure (SIAP) to Runway (RWY) 32 has made this 
action necessary. The intended effect of this action is to provide 
adequate controlled airspace for Instrument Flight Rules (IFR) 
operations at Hanford Municipal Airport, Hanford, CA.

EFFECTIVE DATE: 0901 UTC June 20, 1996.

FOR FURTHER INFORMATION CONTACT:
William Buck, Airspace Specialist, System Management Branch, AWP-530, 
Air Traffic Division, Western-Pacific Region, Federal Aviation 
Administration, 15000 Aviation Boulevard, Lawndale, California 90261, 
telephone (310) 725-6556.

SUPPLEMENTARY INFORMATION:

History

    On January 8, 1996, the FAA proposed to amend part 71 of the 
Federal Aviation Regulations (14 CFR part 71) by amending the Class E 
airspace area at Hanford, CA (61 FR 548). This action will provide 
adequate controlled airspace to accommodate a GPS SIAP to RWY 32 at 
Hanford Municipal Airport, Hanford, CA.
    Interested parties were invited to participate in this rulemaking 
proceeding by submitting written comments on the proposal to the FAA. 
No comments to the proposal were received. Class E airspace 
designations are published in paragraph 6005 of FAA Order 7400.9C dated 
August 17, 1995, and effective September 16, 1995, which is 
incorporated by reference in 14 CFR 71.1. The E airspace designations 
listed in this document will be published subsequently in this Order.

The Rule

    This amendment to part 71 of the Federal Aviation Regulations (14 
CFR part 71) amends the Class E airspace area at Hanford, CA. The 
development of a GPS SIAP to RWY 32 has made this action necessary. The 
intended effect of this action is to provide adequate controlled 
airspace for aircraft executing the GPS RWY 32 SIAP at Hanford 
Municipal Airport, Hanford, CA.
    The FAA has determined that this regulation only involves an 
established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this regulation--(1) is not a ``significant regulatory 
action'' under Executive Order 12866; (2) is not a ``significant rule'' 
under DOT Regulatory Policies and Procedures (44 FR 10034; February 26, 
1979); and (3) does not warrant preparation of a Regulatory Evaluation 
as the anticipated impact is so minimal. Since this is a routine matter 
that will only affect air traffic procedures and air navigation, it is 
certified that this rule will not have a significant economic impact on 
a substantial number of small entities under the criteria of the 
Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

Adoption of the Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration amends 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR part 71 continues to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet or more above the surface of the earth.

* * * * *

AWP CA E5 Hanford, CA [Revised]

Hanford Municipal Airport, CA
    (lat. 36 deg.19'07'' N, long. 119 deg.37'44'' W)
Visalia VOR/DME
    (lat. 36 deg.22'02'' N, long. 119 deg.28'56'' W)
Blair Airport, CA
    (lat. 36 deg.16'31'' N, long. 119 deg.38'26'' W)

    That airspace extending upward from 700 feet above the surface 
within a 2.6-mile radius of the Hanford Municipal Airport and within 
1.8 miles north and 2.3 miles south of the Visalia VOR/DME 246 deg. 
radial, extending from the 2.6-mile radius to the Visalia VOR/DME 
and 1.5 miles each side of the 152 deg. bearing from the Hanford 
Municipal Airport, extending from the 2.6 mile radius to 5 miles 
southeast of the Hanford Municipal Airport, excluding the Visalia, 
CA, Class E airspace area, and excluding that airspace within a 1-
mile radius of the Blair Airport.
* * * * *
    Issued in Los Angeles, California, on February 23, 1996.
James H. Snow,
Acting Manager, Air Traffic Division, Western-Pacific Region.
[FR Doc. 96-5724 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-5716 Removal of U.S. Grade Standards and Other Selected Regulations
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9589-9590]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5716]

========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================

Federal Register / Vol. 61, No. 48 /  Monday, March 11, 1996 / Rules 
and Regulations

[[Page 9589]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Parts 29, 31, 32, 51, 52, 53, 54, 56, 58, 70, and 160

[Docket Number FV-95-303]

Removal of U.S. Grade Standards and Other Selected Regulations

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Reopen and Extension of Comment Period.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the time period for filing 
comments is reopened and extended on the interim final rule published 
in the December 4, 1995, issue of the Federal Register (60 FR 62172-
62181). The comment period is extended until July 9, 1996. The comment 
period is extended to allow interested parties adequate time to 
comment.

DATES: Comments must be received by July 9, 1996.

ADDRESSES: Interested persons are invited to submit written comments 
concerning this interim final rule. Comments must be submitted in 
duplicate, signed, include the address of the sender, and should bear 
reference to the date and page number of this issue of the Federal 
Register. Commentors are encouraged to include definitive information 
which explains and supports the sender's views. Written comments may be 
mailed to Eric Forman, Deputy Director, Fruit and Vegetable Division, 
USDA, AMS, Room 2085-S, P.O. Box 96456, Washington, DC 20090-6456.
    Comments will be available for public inspection during regular 
business hours in Room 2085-South Building; 14th Street and 
Independence Avenue, SW., Washington, D.C.

FOR FURTHER INFORMATION CONTACT: Eric Forman (202) 690-0262.

SUPPLEMENTARY INFORMATION: On December 4, 1995, an interim final rule 
was published in the Federal Register requesting comments on USDA's 
initiative to remove voluntary U.S. grade standards and other selected 
regulations covering a number of agricultural commodities (dairy 
products, tobacco, wool, mohair, fresh and processed fruits and 
vegetables, livestock, meats and meat products, eggs, and poultry and 
rabbit products) from the Code of Federal Regulations (CFR). Comments 
were to be received by February 2, 1996.
    On January 31, 1996, we received a comment from the American Dairy 
Products Institute (ADPI) requesting that implementation of the removal 
of grade standards for dairy products from the CFR be postponed and 
that the period for comment be extended for an additional 120 days. On 
February 2, 1996, we received a comment from the American Meat 
Institute (AMI) requesting that the comment period be extended for an 
additional 60 days to allow time for clarification of the procedures 
for developing and revising standards that will ensure that industry 
will be able to comment on, and receive responses to, their concerns 
about future modifications to grade standards.
    Both commentors expressed several of their concerns and the 
importance of having the comment period extended to allow additional 
time for their members to truly evaluate this initiative and the full 
impact it would have on their industry. This rule was developed in 
response to the President's regulatory review initiative. This provided 
the impetus to develop new approaches to meet more effectively the 
needs of U.S. industry, government agencies, and consumers and still 
reduce the regulatory burden. As part of this initiative, voluntary 
standards that are currently in the CFR and are administered by AMS are 
being removed from that publication. This rule eliminates selected 
regulations which encompass approximately 1,200 pages of the CFR. With 
respect to the official grade standards, this includes all the 
standards except those which are currently in the rulemaking process, 
or are incorporated by reference in marketing orders/agreements 
appearing at 7 CFR Parts 900 through 999 or those necessary for 
implementing government price support. Those grade standards will 
continue to appear in the CFR, although they will also be available in 
separate publications along with all other grade standards, except 
those for wool and mohair. Standards for wool and mohair and related 
regulations will be removed from the CFR and will no longer be 
available since there is no demand for services pertaining to wool or 
mohair.
    Since the Department has no objection to the requests for extension 
of the comment period, we suggest that the period be reopened and 
extended for an additional 120 days. Accordingly, the comment period is 
extended to July 9, 1996.

List of Subjects

7 CFR Part 29

    Administrative practice and procedure, Advisory committees, 
Government publications, Imports, Pesticides and pests, Reporting and 
recordkeeping requirements, Tobacco.

7 CFR Part 31

    Wool.

7 CFR Part 32

    Mohair.

7 CFR Part 51

    Agricultural commodities, Food grades and standards, Fruits, Nuts, 
Reporting and recordkeeping requirements, Trees, Vegetables.

7 CFR Part 52

    Food grades and standards, Food labeling, Frozen foods, Fruit 
juices, Fruits, Reporting and recordkeeping requirements, Vegetables.

7 CFR Part 53

    Cattle, Hogs, Livestock, Sheep.

7 CFR Part 54

    Food grades and standards, Food labeling, Meat and meat products.

7 CFR Part 56

    Eggs and egg products, Food grades and standards, Food labeling, 
Reporting and recordkeeping requirements.

7 CFR Part 58

    Dairy products, Food grades and standards, Food labeling, Reporting 
and recordkeeping requirements. 

[[Page 9590]]

7 CFR Part 70

    Food grades and standards, Food labeling, Poultry and poultry 
products, Rabbits and rabbit products, Reporting and recordkeeping 
requirements.

7 CFR Part 160

    Administrative practice and procedure, Advertising, Forests and 
forest products, Labeling, Packaging and containers, Reporting and 
recordkeeping requirements.

    Dated: February 29, 1996.
David N. Lewis,
Acting Administrator.
[FR Doc. 96-5716 Filed 3-8-96; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 96-5710 Oil Discharge Program; Removal of Legally Obsolete Rules
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9646-9648]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5710]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 112, 114, and 117

[FRL-5432-9]

Oil Discharge Program; Removal of Legally Obsolete Rules

AGENCY: Environmental Protection Agency.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is today removing 
from the Code of Federal Regulations (CFR) rules pertaining to the oil 
and hazardous substances discharge program promulgated under the Clean 
Water Act (``CWA'') which apply only to violations that occurred prior 
to enactment of the Oil Pollution Act of 1990 (``OPA''). Because EPA is 
unaware of any on-going penalty actions for pre-OPA violations, it is 
deleting these rules from the CFR.

EFFECTIVE DATE: This final rule takes effect on March 11, 1996.

FOR FURTHER INFORMATION CONTACT: Kevin Mould, Office of Emergency and 
Remedial Response, U.S. Environmental Protection Agency, 401 M Street 
SW., Washington, DC 20460, mail code 5202G, phone (703) 603-8728; or 
the RCRA/Superfund Hotline, phone (800) 424-9346 or (703) 603-9232 in 
the Washington, DC metropolitan area.

SUPPLEMENTARY INFORMATION:

I. Introduction

    On March 4, 1995 the President directed all Federal agencies and 
departments to conduct a comprehensive review of the regulations they 
administer and, by June 1, 1995 to identify those rules that are 
obsolete or unduly burdensome. EPA has conducted a review of all of its 
rules, including rules issued under the CWA. 33 U.S.C. 1251 et seq. 
Based upon this review, EPA is today eliminating the following obsolete 
CWA rules from the CFR: 40 CFR section 112.6, Part 114, and section 
117.22.

II. Obsolete Rules

Civil Penalties for Violation of the Oil Pollution Prevention 
Regulations (Section 112.6 and Part 114)

    The civil penalty provision of the oil pollution prevention 
regulations (40 CFR 112.6), and the related civil penalty provisions 
and procedures at 40 CFR part 114 were promulgated in 1974 pursuant to 
section 311(j) of the CWA. 39 FR 31602, August 29, 1974. Part 112 sets 
out, for onshore and offshore non-transportation-related facilities, 
requirements designed to prevent discharges of oil into or upon 
``navigable waters and adjoining shorelines.'' 40 CFR 112.6 and 114.1 
each provide that violations of the oil pollution prevention 
regulations may result in the assessment of an administrative penalty 
of not more than $5,000 per day of violation. 40 CFR 112.6 and 114.1 
are based on authority in CWA section 311(j)(2), which, before its 
amendment by the Oil Pollution Act of 1990 (OPA), limited civil 
penalties assessed for violations of regulations issued under section 
311(j) to ``not more than $5,000 for each such violation.''
    OPA repealed CWA section 311(j)(2) and amended CWA section 
311(b)(6) to provide that violators of CWA section 311(j) may be 
assessed a Class I penalty of up to $10,000 per violation (up to a 
maximum assessment of $25,000), or a Class II penalty of up to $10,000 
per day of violation (up to a maximum assessment of $125,000). Further, 
section 311(b)(6) now provides for different administrative proceedings 
for these two classes of penalties. Respondents in Class I cases are 
given a reasonable opportunity to be heard and to present evidence, but 
the hearing need not meet the requirements of the Administrative 
Procedure Act (APA) for formal adjudications (5 U.S.C. 554). Class II 
hearings, however, are on the record and subject to 5 U.S.C. 554.
    As a result of these OPA-enacted changes in both the penalty 
amounts and the procedures needed to be followed in issuing penalties, 
EPA amended section 112.6 and Part 114 to ensure that the provisions 
would be applicable only to violations of the Oil Pollution Prevention 
regulations contained in 40 CFR Part 112 which occurred prior to 
enactment of OPA (August 18, 1990). 57 FR 52704 (Nov. 4, 1992). At the 
present time--more than five years after enactment of OPA--EPA is 
unaware on any on-going penalty actions for violations of the Part 112 
regulations which occurred prior to August 18, 1990. EPA is therefore 
deleting section 112.6 and Part 114 from the CFR.
    As explained in a prior Federal Register notice, EPA will use two 
sets of procedures for assessing administrative penalties for 
violations of CWA section 311(b)(3) occurring after August 18, 1990. 57 
FR 52704 (Nov. 4, 1992). For Class I penalties, the Agency follows 
generally the procedures set forth in the proposed 40 CFR 28, Non-APA 
Consolidated Rules of Practice for Administrative Assessment of Civil 
Penalties. 56 FR 29996 (July 1, 1991). For the assessment of CWA 
section 311 Class II penalties, the Agency uses as guidance the 
Consolidated Rules of Practice Governing the Administrative Assessment 
of Civil Penalties and the Revocation or Suspension of Permits at 40 
CFR 22.

Notification of Hazardous Substances Discharge(s) and Prohibition 
Against Unauthorized Discharges

    40 CFR 117 generally establishes the reportable quantities for CWA 
hazardous substances designated under 40 CFR 116 for purposes of CWA 
section 311. 40 CFR 117.21 sets out the notification requirement for 
discharges of designated hazardous substances pursuant to CWA section 
311(b)(5). 40 CFR 117.22(b) provides that violation(s) of the 
notification requirement may result in a fine of not more than $10,000 

[[Page 9647]]
or imprisonment for not more than one year, or both. However, 40 CFR 
117.22(b) is based on language in former CWA section 311(b)(5), which 
was amended by OPA. Section 4301 of OPA amended CWA section 311(b)(5) 
to provide that any person convicted of violation of the notification 
requirement in CWA section 311(b)(5) be ``fined in accordance with 
title 18, United States Code, or imprisoned for not more than 5 years, 
or both.'' 33 U.S.C. 1321(b)(5). As a result of this change in the 
penalty provision enacted by OPA, EPA amended section 117.22 by making 
it applicable only to violations occurring prior to August 18, 1990, 
the date of enactment of the Oil Pollution Act. 40 CFR 117.22(a); see 
57 FR 52704 (Nov. 4, 1992).
    40 CFR 117.22(c) provides that an owner, operator or a person in 
charge of a vessel or facility that has discharged a designated 
hazardous substance exceeding the reportable quantity may be subject to 
a civil administrative penalty assessment of up to $5,000 per 
violation. The regulation also states that the Agency may pursue a 
judicial civil penalty action, seeking up to $50,000 per violation; 
where the discharge resulted from willful negligence or willful 
misconduct, the maximum judicial civil penalty is $250,000. 40 CFR 
117.22(c) is based on language in former CWA section 311(b)(6)(A), 
which was amended by OPA.
    As indicated above, section 4301 of OPA repealed CWA section 
311(b)(6) and replaced it with a new penalty assessment framework. CWA 
section 311(b)(6) now provides that violators of the prohibition 
against unauthorized discharges in section 311(b)(3) may be assessed a 
Class I penalty of up to $10,000 per violation (up to a maximum 
assessment of $25,000) or a Class II penalty of up to $10,000 per day 
of violation (up to a maximum assessment of $125,000). 33 U.S.C. 
1321(b)(6)(B). Section 4301 of OPA also added CWA section 311(b)(7), 
which provides for the judicial assessment of civil penalties for 
violations of CWA section 311(b)(3) of up to ``$25,000 per day of 
violation'' or up to ``$1,000 per barrel of oil or unit of reportable 
quantity of hazardous substances.'' For violations of section 311(b)(3) 
that are a result of gross negligence or willful misconduct, the 
violator now is subject to a civil penalty of ``not less than $100,000 
and not more than $3,000 per barrel or oil or unit of reportable 
quantity or hazardous substance discharged.''
    As a result of the changes in penalties for prohibited discharges 
of CWA hazardous substances as enacted by the OPA, EPA amended section 
117.22(c) to make it applicable only to violations of the discharge 
prohibition which occurred prior to August 18, 1990, the date of 
enactment of the Oil Pollution Act. 40 CFR 117.22(a); see 57 FR 52704 
(Nov. 4, 1992). At the present time, EPA is unaware of any on-going 
administrative penalty actions for violations of the notification 
requirements in CWA section 311(b)(5) or the discharge prohibitions for 
hazardous substances in CWA section 311(b)(3) which occurred prior to 
August 18, 1990. All violations of the notification requirements and 
discharge prohibitions which have occurred or will occur since 
enactment of OPA will be subject to the different penalty provisions 
contained in CWA sections 311(b)(6) and 311(b)(7), as amended by OPA. 
Furthermore, CWA section 311, as amended by OPA, itself provides all 
the necessary legal authorities establishing penalties for the 
violation of section 311(b)(5) notification requirements and section 
311(b)(3) discharge prohibitions. EPA is therefore deleting 40 CFR 
section 117.22 from the Code of Federal Regulations.

III. Good Cause Exemption From Notice-and-Comment Rulemaking 
Procedures

    The Administrative Procedure Act generally requires agencies to 
provide prior notice and opportunity for public comment before issuing 
a final rule. 5 U.S.C. Sec. 553(b). Rules are exempt from this 
requirement if the issuing agency finds for good cause that notice and 
comment are unnecessary. 5 U.S.C. Sec. 553(b)(3)(B).
    EPA has determined that providing prior notice and opportunity for 
comment on the deletion of these rules from the CFR is unnecessary. As 
discussed in Sections I and II, EPA is unaware of any proceedings 
pending under these rules. Withdrawing them will affect only the few, 
if any, future proceedings that may be initiated for pre-OPA 
violations.
    For the same reasons, EPA believes there is good cause for making 
the removal of these rules from the CFR immediately effective. See 5 
U.S.C. Sec. 553(d).

IV. Differentiation between Classes of Oil

    The Edible Oil Regulatory Reform Act, Public Law 104-55, requires 
most federal agencies to differentiate between and establish separate 
classes for (1) animal fats and oils and greases, fish and marine 
mammal oils, and oils of vegetable origin and (2) other greases and 
oils, including petroleum, when issuing or enforcing any regulation or 
establishing any interpretation or guideline relating to the 
transportation, storage, discharge, release, emission, or disposal of a 
fat, oil or grease. EPA has determined that no differentiation between 
these classes of oil is necessary for the portions of this rule that 
relate to the discharge of oil (Part 114 and section 112.6). This rule 
imposes no substantive requirements; instead the rule merely deletes 
provisions of the oil pollution prevention program that are legally 
obsolete for the reasons stated above.

V. Analyses under E.O. 12866, the Unfunded Mandates Reform Act of 1995, 
the Regulatory Flexibility Act and the Paperwork Reduction Act

    For the above reasons, this action is not a ``significant'' 
regulatory action within the meaning of E.O. 12866. It also does not 
impose any Federal mandate on State, local or tribal governments or the 
private sector within the meaning of the Unfunded Mandates Reform Act 
of 1995. For the same reasons, pursuant to the Regulatory Flexibility 
Act, I certify that this action would not have a significant economic 
impact on a substantial number of small entities. Finally, this action 
would not impose any requirements under the Paperwork Reduction Act.

List of Subjects

40 CFR Part 112

    Environmental protection, Oil pollution penalties, Reporting and 
recordkeeping requirements.

40 CFR Part 114

    Administrative practice and procedure, Oil pollution, Penalties.

40 CFR Part 117

    Hazardous substances, Penalties, Reporting and recordkeeping 
requirements, Water pollution control.

    Dated: February 15, 1996.
Elliott P. Laws,
Assistant Administrator Office of Solid Waste and Emergency Response.

    For the reasons set out in the preamble, under the authority at 33 
U.S.C. 1361(a), title 40, chapter I of the Code of Federal Regulations 
is amended as follows:

PART 112--[AMENDED]

    1. The authority citation for part 112 continues to read as 
follows:

    Authority: 33 U.S.C. 1321 and 1361; E.O. 12777 (October 18, 
1991), 3 CFR, 1991 Comp., p. 351.

Sec. 112.6  [Removed]

    2. Section 112.6 is removed. 
    
[[Page 9648]]

PART 114--[REMOVED]

    3. Part 114 is removed.

PART 117--[AMENDED]

    4. The authority citation for part 117 continues to read as 
follows:

    Authority: Secs. 311 and 501(a), Federal Water Pollution Control 
Act (33 U.S. C. 1251 et seq.), (``the Act'') and E.O. 11735 
superseded by E.O. 12777 56 FR 54757.

Sec. 117.22  [Removed]

    5. Section 117.22 is removed.

[FR Doc. 96-5710 Filed 3-8-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-5689 Airworthiness Directives; Boeing Model 757 Series Airplanes Equipped With Abex Spoiler Actuators
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9607-9611]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5689]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-277-AD; Amendment 39-9537; AD 96-06-01]

Airworthiness Directives; Boeing Model 757 Series Airplanes 
Equipped With Abex Spoiler Actuators

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: This amendment adopts a new airworthiness directive (AD), 
applicable to Boeing Model 757 series airplanes that are equipped with 
certain Abex spoiler actuator electro-hydraulic servo valves (EHSV) 
installed in Abex spoiler actuators. This action requires a one-time 
inspection of the spoiler actuator to determine if a suspect EHSV is 
incorrectly installed, and replacement of the EHSV, if necessary. This 
amendment is prompted by reports that a bias spring in the Abex EHSV of 
certain Abex spoiler actuators has been found to be incorrectly 
installed. The actions specified in this AD are intended to prevent a 
significant control upset of the airplane as a result of problems 
associated with an incorrectly installed EHSV in the spoiler actuator 
assembly.

DATES: Effective March 26, 1996.
    Comments for inclusion in the Rules Docket must be received on or 
before May 10, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, ANM-103, 
Attention: Rules Docket No. 95-NM-277-AD, 1601 Lind Avenue SW., Renton, 
Washington 98055-4056.
    Information concerning this AD action may be examined at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, 
Washington.

FOR FURTHER INFORMATION CONTACT: Don Eiford, Aerospace Engineer, 
Systems and Equipment Branch, ANM-130S, FAA, Seattle Aircraft 
Certification Office, 1601 Lind Avenue SW., Renton, Washington; 
telephone (206) 227-2788; fax (206) 227-1181.

SUPPLEMENTARY INFORMATION: The FAA has received reports that a bias 
spring in the Abex electro-hydraulic servo valve 

[[Page 9608]]
(EHSV) in certain Abex spoiler actuators that are installed on certain 
Boeing Model 757 series airplanes has been found to be incorrectly 
installed. One operator received three valves on which the bias spring 
was installed on the wrong side of the EHSV second stage spool. 
Investigation revealed that the valves had been assembled incorrectly 
during repair at a non-U.S. repair facility. The subject EHSV's are 
Abex P/N 72196, Boeing Specification S251N116-1, Model 410-1870.
    If the jet pipe in the first stage of the EHSV is plugged, or if 
the differential pressure between the extend and retract ports 
pressurized by the jet pipe is inadequate, an incorrectly installed 
bias spring on the second stage spool would cause the spoiler to be 
driven into the ``deploy'' position. Such inadvertent spoiler 
deployment would result in the airplane experiencing a rolling moment. 
If the airplane is already banked or is at a low altitude, or if the 
crew does not respond rapidly enough to control the uncommanded roll, a 
significant control upset of the airplane could result.
    Since an unsafe condition has been identified that is likely to 
exist or develop on other airplanes of the same type design, this AD is 
being issued to prevent the occurrence of a significant control upset 
of the airplane due to problems associated with suspect EHSV's in the 
spoiler actuator. This AD requires a one-time inspection of the Abex 
EHSV on the spoiler actuator to determine if a suspect valve is 
incorrectly installed; if so, the EHSV must be replaced.
    None of the Model 757 series airplanes affected by this action are 
on the U.S. Register. All airplanes included in the applicability of 
this rule currently are operated by non-U.S. operators under foreign 
registry; therefore, they are not directly affected by this AD action. 
However, the FAA considers that this rule is necessary to ensure that 
the unsafe condition is addressed in the event that any of these 
subject airplanes are imported and placed on the U.S. Register in the 
future.
    Should an affected airplane be imported and placed on the U.S. 
Register in the future, it would require approximately 1 work hour to 
accomplish the required actions, at an average labor charge of $60 per 
work hour. Based on these figures, the cost impact of this AD would be 
$60 per airplane.
    Since this AD action does not affect any airplane that is currently 
on the U.S. register, it has no adverse economic impact and imposes no 
additional burden on any person. Therefore, notice and public 
procedures hereon are unnecessary and the amendment may be made 
effective in less than 30 days after publication in the Federal 
Register.

Comments Invited

    Although this action is in the form of a final rule and was not 
preceded by notice and opportunity for public comment, comments are 
invited on this rule. Interested persons are invited to comment on this 
rule by submitting such written data, views, or arguments as they may 
desire. Communications shall identify the Rules Docket number and be 
submitted in triplicate to the address specified under the caption 
ADDRESSES. All communications received on or before the closing date 
for comments will be considered, and this rule may be amended in light 
of the comments received. Factual information that supports the 
commenter's ideas and suggestions is extremely helpful in evaluating 
the effectiveness of the AD action and determining whether additional 
rulemaking action would be needed.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the rule that might 
suggest a need to modify the rule. All comments submitted will be 
available, both before and after the closing date for comments, in the 
Rules Docket for examination by interested persons. A report that 
summarizes each FAA-public contact concerned with the substance of this 
AD will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this rule must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket Number 95-NM-277-AD.'' The postcard will be date stamped and 
returned to the commenter.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) Is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

96-06-01  Boeing: Amendment 39-9537. Docket 95-NM-277-AD.

    Applicability: Model 757 airplanes, certificated in any 
category, that are equipped with Abex spoiler actuators having Abex 
electro-hydraulic servo valves (EHSV), part number 72196, with the 
serial numbers listed in Table 1 of this AD:

                                 Table 1                                
------------------------------------------------------------------------
                                 Boeing order                           
       EHSV serial No.              No.*-            Shipment date*     
------------------------------------------------------------------------
AH-0001......................  C716657........  8 November 1991.        
AH-0002......................  C716657........  8 November 1991.        
AH-0003......................  C727995........  25 August 1994.         
AH-0004......................  C727995........  25 August 1994.         
AH-0005......................  C727995........  25 August 1995.         
AH-0006......................  C727995........  25 August 1995.         
AH-0007......................  C727995........  25 August 1995.         
13...........................  C731181........  12 June 1995.           
49...........................  C730878........  01 June 1995.           
61...........................  C727955........  13 September 1994.      
131..........................  C708905........  13 November 89.         
233..........................  C727730........  17 June 1994.           
241..........................  C731540........  13 September 1995.      
260..........................  C727955........  13 September 1994.      
279..........................  C728298........  02 September 1994.      
275..........................  C727880........  24 June 1994.           
308..........................  C725421........  01 December 1993.       
329..........................  C727711........  17 June 1994.           
347..........................  C727518........  14 June 1994.           
401..........................  C728298........  05 September 1994.      
407..........................  C727730........  17 June 1994.           
427..........................  C731181........  03 July 1995.           

[[Page 9609]]
                                                                        
450..........................  C731181........  03 July 1995.           
445..........................  C706627........  22 February 89.         
457..........................  C731663........  12 September 1995.      
456..........................  C728887........  28 November 1994.       
463..........................  C731435........  21 August 1995.         
484..........................  C727748........  22 June 1994.           
515..........................  C727745........  24 June 1994.           
569..........................  C728290........  05 September 1994.      
579..........................  C724176........  14 September 1993.      
611..........................  C727955........  14 September 1994.      
607..........................  C727997........  20 July 1994.           
647..........................  C728459........  10 October 1994.        
726..........................  C731096........  04 September 1995.      
725..........................  C729525........  19 December 1994.       
819..........................  C728135........  03 August 1994.         
890..........................  C726803........  06 April 1994.          
874..........................  C730890........  26 April 1995.          
912..........................  C727977........  04 August 1994.         
991..........................  C713602........  10 December 90.         
998..........................  C731477........  4 September 1995.       
1022.........................  C708905........  13 November 89.         
1023.........................  C708905........  13 November 89.         
1072.........................  C709166........  14 November 89.         
1148.........................  C730192........  13 March 1995.          
1175.........................  C723278........  05 August 1993.         
1227.........................  C728303........  31 August 1994.         
1283.........................  C731833........  04 September 1995.      
1487.........................  C728549........  04 October 1994.        
1655.........................  C728442........  28 November 1994.       
1780.........................  C726757........  06 April 1994.          
1807.........................  C728669........  29 September 1994.      
1862.........................  C727625........  17 June 1994.           
1929.........................  C727977........  04 August 1994.         
1986Z........................  C727730........  17 June 1994.           
2017Z........................  C725411........  24 November 1993.       
2034.........................  C727730........  17 June 1994.           
2073.........................  C731272........  12 September 1995.      
2125.........................  C725713........  12 January 1994.        
2220.........................  C729735........  29 March 1995.          
2334.........................  C727730........  17 June 1994.           
2348.........................  C727730........  17 June 1994.           
2426.........................  C731623........  12 July 1995.           
------------------------------------------------------------------------
*The Boeing Order Number and Shipment Date are included in this listing 
  to enable operators to review their records in order to determine if a
  suspect EHSV has been ordered, and if, or where, it has been installed
  on an airplane.                                                       

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (b) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent a significant control upset of the airplane due to 
problems associated with incorrectly assembled Abex electro-
hydraulic servo valves (EHSV) on certain Abex spoiler actuators, 
accomplish the following:
    (a) Within 6 months after the effective date of this AD, perform 
the following procedure:
    (1) While the airplane is on the ground, extend the flaps to 40 
degrees. and visually inspect the spoiler actuator EHSV assembly to 
determine the location of the second stage bias spring end cap 
assembly.
    (2) If the second stage bias spring cap assembly is on the aft 
or lower side of the EHSV assembly, prior to further flight, replace 
the EHSV, having Abex part number 72196, with a serviceable unit in 
accordance with the airplane maintenance manual.

    Note 2: To be correctly positioned, the second stage bias spring 
cap assembly should be on the upper or forward side of the EHSV 
assembly. Appendix 1 of this AD provides a visual representation of 
the correct positioning of the EHSV assembly.

    (b) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Seattle Aircraft Certification 
Office (ACO), FAA, Transport Airplane Directorate. Operators shall 
submit their requests through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Seattle ACO.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Seattle ACO.

    (c) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (d) This amendment becomes effective on March 26, 1996.

BILLING CODE 4910-13-U

[[Page 9610]]

Appendix 1

[GRAPHIC] [TIFF OMITTED] TR11MR96.004

[[Page 9611]]

BILLING CODE 4910-13-C
    Issued in Renton, Washington, on March 5, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-5689 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-5688 Delegations of Authority and Organization; Correction
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Page 9639]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5688]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration

21 CFR Part 5

Delegations of Authority and Organization; Correction

AGENCY: Food and Drug Administration, HHS.

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is correcting a final 
rule that appeared in the Federal Register of May 19, 1995 (60 FR 
26825). This document amended the regulations for delegations of 
authority covering the certification of true documents and the use of 
the Department seal. In the final rule, ``The Director, Office of Food 
Labeling (CFSAN).'' was inadvertently omitted from the regulation. This 
document corrects that error.

EFFECTIVE DATE: May 19, 1995.

FOR FURTHER INFORMATION CONTACT: Ellen Rawlings, Division of Management 
Systems and Policy (HFA-340), Food and Drug Administration, 5600 
Fishers Lane, Rockville, MD 20857, 301-443-4976.
    In FR Doc. 95-12398, appearing on page 26825, in the Federal 
Register of Friday, May 19, 1995, the following correction is made:

Sec. 5.22  [Corrected]

    On page 26826, in the second column, Sec. 5.22 is corrected by 
adding paragraph (a)(9)(xiii) to read as follows:

Sec. 5.22  Certification of true copies and use of Department seal.

    (a) * * *
    (9) * * *
    (xiii) The Director, Office of Food Labeling, CFSAN.
-* * * * *

    Dated: February 2, 1996.
William K. Hubbard,
Associate Commissioner for Policy Coordination.
[FR Doc. 96-5688 Filed 3-8-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-5683 Changes to Customs List of Designated Public International Organizations: INTERPOL
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9637-9639]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5683]

=======================================================================
-----------------------------------------------------------------------

[[Page 9638]]

DEPARTMENT OF THE TREASURY

Customs Service

19 CFR Part 148

[T.D. 96-23]

Changes to Customs List of Designated Public International 
Organizations: INTERPOL

AGENCY: Customs Service, Treasury.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This document amends the Customs Regulations by adding the 
International Criminal Police Organization (INTERPOL) to Customs list 
of designated public international organizations entitled to certain 
free entry privileges provided for under provisions of the 
International Organizations Immunities Act.

EFFECTIVE DATE: March 11, 1996.

FOR FURTHER INFORMATION CONTACT: Dennis Sequeira, Director, 
International Organizations & Agreements Division, Office of 
International Affairs (202) 927-1480.

SUPPLEMENTARY INFORMATION:

Background

    The International Organizations Immunities Act, 22 U.S.C. 288, 
generally provides that certain international organizations, agencies, 
and committees, those in which the United States participates or 
otherwise has an interest and which have been designated by the 
President through appropriate Executive Order as public international 
organizations, are entitled to enjoy certain privileges, exemptions, 
and immunities conferred by the Act. The Department of State lists the 
public international organizations, designated by the President as 
entitled to enjoy any measure of the privileges, exemptions, and 
immunities conferred by the Act, in the notes following the provisions 
of Section 288.
    One of the privileges provided for under the Act is that the 
baggage and effects of alien officers, employees, and representatives--
and their families, suites, and servants--to the designated 
organization, are admitted free of duty and without entry. The list of 
designated organizations entitled to this duty-free entry privilege are 
delineated at Sec. 148.87(b), Customs Regulations (19 CFR 148.87(b)). 
Thus, the list of public international organizations maintained by 
Customs is for the limited purpose of identifying those organizations 
entitled to the duty-free entry privilege; it does not necessarily 
include all of the international organizations that are on the list 
maintained by the Department of State, which delineates all of the 
international organizations designated by the President regardless of 
the extent of the privileges conferred.
    Executive Order (EO) 12425 of June 16, 1983, 48 FR 28069, 3 CFR 
part 1983 Comp.p. 193, 19 Weekly Comp.Pres.Doc. 885, designated the 
International Criminal Police Organization (INTERPOL) as a public 
international organization with limited privileges; certain privileges, 
such as duty-free customs entry and exemption from federal internal-
revenue importation taxes were not extended to INTERPOL. See T.D. 93-
45. Thus, INTERPOL was listed on the Department of State's list of 
designated international organizations, but not Customs list. By EO 
12971 of September 15, 1995, 60 FR 48617, 3 CFR part 1996 Comp.p. ____, 
31 Weekly Comp.Pres.Doc. 1572, the President amended EO 12425 in order 
to extend some of the privileges, exemptions, and immunities to 
INTERPOL withheld by EO 12425; one being the privilege of duty-free 
Customs entry. Accordingly, Customs is amending its list of designated 
public international organizations at Sec. 148.87(b) of the Customs 
Regulations (19 CFR 148.87(b)) to include INTERPOL.

Inapplicability of Public Notice and Comment Requirements, Delayed 
Effective Date Requirements, the Regulatory Flexibility Act, and 
Executive Order 12866

    Because this amendment merely corrects the listing of designated 
organizations entitled by law to free entry privileges as public 
international organizations, pursuant to 5 U.S.C. 553(b)(B), good cause 
exists for dispensing with notice and public procedure thereon as 
unnecessary. For the same reason, good cause exists for dispensing with 
a delayed effective date under 5 U.S.C. 553(d)(1) and (3). Since this 
document is not subject to the notice and public procedure requirements 
of 5 U.S.C. 553, it is not subject to provisions of the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.). This document does not meet the 
criteria for a ``significant regulatory action'' as specified in E.O. 
12866.

Drafting Information

    The principal author of this document was Gregory R. Vilders, 
Attorney, Regulations Branch, Office of Regulations and Rulings.

List of Subjects in 19 CFR Part 148

    Customs duties and inspection, Executive orders, Foreign officials, 
Government employees, International organizations, Privileges and 
immunities, Taxes.

Amendment to the Regulations

    For the reasons stated above, part 148, Customs Regulations (19 CFR 
part 148), is amended as set forth below:

PART 148--PERSONAL DECLARATIONS AND EXEMPTIONS

    1. The general authority citation for part 148 and the specific 
authority citation for Sec. 148.87 continue to read as follows:

    Authority: 19 U.S.C. 66, 1496, 1498, 1624. The provisions of 
this part, except for subpart C, are also issued under 19 U.S.C. 
1202 (General Note 20, Harmonized Tariff Schedule of the United 
States);
* * * * *
    Section 148.87 also issued under 22 U.S.C. 288.
* * * * *
    2. Section 148.87(b) is amended by adding the following, in 
appropriate alphabetical order, to the table, to read as follows:

Sec. 148.87  Officers and employees of, and representatives to, public 
international organizations.

* * * * *
    (b) * * *

                                                                        
                                             Executive                  
               Organization                    order          Date      
                                                                        
                                                                        
*                  *                  *                  *              
                  *                  *                  *               
International Criminal Police Organization                              
 (INTERPOL)--Limited privileges...........       12425    June 16, 1983.
                                                 12971    Sep. 15, 1995.
                                                                        
*                  *                  *                  *              
                  *                  *                  *               
                                                                        

[[Page 9639]]

George J. Weise,
Commissioner of Customs.
    Approved: February 11, 1996.
John P. Simpson,
Deputy Assistant Secretary of the Treasury.
[FR Doc. 96-5683 Filed 3-8-96; 8:45 am]
BILLING CODE 4820-02-P

Complete official Federal Register PDF

FR Doc. 96-5670 Temporary Local Match Waiver; Removal
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9650-9651]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5670]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

49 CFR Part 671

[Docket 93-A]
RIN 2132-AA49

Temporary Local Match Waiver; Removal

AGENCY: Federal Transit Administration, DOT.

ACTION: Final Rule.

-----------------------------------------------------------------------

SUMMARY: Because the supporting statutory authority has expired, the 
Federal Transit Administration (FTA) is removing the Temporary Local 
Match Waiver for sections 9 and 18 from the Code of Federal 
Regulations. FTA made this determination as part of the President's 
``reinventing government'' initiative.

EFFECTIVE DATE: March 11, 1996.

FOR FURTHER INFORMATION CONTACT: Nancy Zaczek, Attorney-Advisor, Office 
of the Chief Counsel, (202) 366-4011.

SUPPLEMENTARY INFORMATION:

Introduction

    On August 11, 1993, FTA published an Interim Final Rule announcing 
a temporary change in how it finances capital projects for certain FTA-
funded programs, specifically allowing for a ``waiver'' of the local 
match requirements under two FTA-funded programs. 58 FR 42690. The 
underlying statutory authority for that policy change has expired, thus 
prompting FTA to remove 49 CFR 671 from the Code of Federal 
Regulations. The Federal Highway Administration (FHWA) published a 
final rule on February 2, 1993 at 58 FR 6713, subsequently codified at 
23 CFR 140, waiving the State matching requirements to fund certain 
kinds of construction projects under the Federal-aid highway program. 
Because FTA and FHWA were authorized by the same statute to waive the 
local or State matching requirements, FTA and FHWA adopted similar 
approaches to implementing the temporary waiver program.

The Temporary Waiver Program

    As explained in the interim final rule, under section 9 of the 
Federal Transit Act, as amended (FT Act) now codified at 49 U.S.C. 
Sec. 5336 and called ``urbanized area formula program,'' and under 
section 18 of the FT Act, now codified at 49 U.S.C. Sec. 5311 and 
called ``non-urbanized area formula program,'' FTA and a recipient of 
its funds share the costs of financing local mass transit capital 
projects. Specifically, FTA pays eighty percent of a capital project's 
eligible costs (the Federal share), and a recipient pays the remaining 
twenty percent (the local match or local share). To ensure the 
sufficiency of local financing for a project, 49 U.S.C. Sec. 5307 
requires a recipient to certify that it can pay its share of the 
project's cost. A similar requirement applies to grants made under 
FTA's ``non-urbanized area formula program.''
    During fiscal years 1992 and 1993, however, an alternative approach 
to these Federal and local share requirements was available. 
Specifically, the Dire Emergency Supplemental Appropriations Act, 1992, 
P.L. 102-302, and the Department of Transportation Appropriations Act, 
1993, P.L. 102-388, (the Acts) permitted FTA, under limited 
circumstances, to waive in fiscal years 1992 and 1993 part or all of 
the local share required for capital projects under 49 U.S.C. 
Secs. 5311 and 5336, thereby increasing the proportion of Federal money 
used to pay for a project, which Part 671 called the ``increased 
Federal share.'' In short, in fiscal years 1992 and 1993 a recipient 
could have funded a project's costs using only Federal money.
    The rule specified the circumstances under which FTA would grant a 
waiver, described the application process, and detailed procedures for 
the repayment of the ``increased Federal share.'' The waiver applied 
only to funds obligated by FTA and drawn down by the recipient before 
October 1, 1993.

Analysis of the Comment

    FTA received only one comment to the interim final rule. That 
comment, from a State Department of Transportation (DOT), raised 
concerns about how the ``increased Federal share'' would be repaid by a 
recipient. The ``increased Federal share'' equals the amount of the 
local share waived by FTA.
    The rule specified that recipients must repay the ``increased 
Federal share'' before March 31, 1994. Should a recipient fail to meet 
this deadline, the rule provided that FTA would deduct fifty percent of 
the amount waived in fiscal year 1995 and fifty percent in fiscal year 
1996 from the recipient's apportionment. If, however, the funds were 
transferred from the Surface Transportation Program or the Congestion 
Mitigation and Air Quality program to formula programs for urbanized or 
non-urbanized areas and the recipient did not repay those funds before 
March 31, 1994, the Federal Highway Administration (FHWA) would deduct 
fifty percent of the amount waived from the originating apportionment 
under the appropriate highway program in FY 1995 and the remaining 
portion in FY 1996.
    The State DOT objected to the latter alternative and recommended 
that State DOTs be given a formal role in approving any waiver 
requested by a recipient, and that any waiver of the local share for a 
transit project be repaid from a recipient's transit apportionment 
regardless of the original source of the funding.
    This State DOT was the only commenter who raised this particular 
concern and therefore FTA concluded that virtually all FTA recipients 
and State DOTs did not see this particular repayment provision as 
burdensome or objectionable. Moreover, the Acts did not give State DOTs 
a role in approving waiver requests. Consequently, FTA did not change 
this particular provision. 

[[Page 9651]]

Regulatory Analysis

    This is not a significant rule under Executive Order 12866 or under 
the Department's Regulatory Policies and Procedures. It does not impose 
costs on regulated parties; it merely removes a Part that has become 
obsolete and whose underlying statutory authority has lapsed. There are 
not sufficient Federalism implications to warrant the preparation of a 
Federalism Assessment. The Department certifies that this rule will not 
have a significant economic impact on a substantial number of small 
entities.

List of Subjects in 49 CFR Part 671

    Grant programs-transportation, Mass Transportation.

    Accordingly, for the reasons set forth above, and under the 
Authority 49 U.S.C. 5334 (b)(2), part 671 is hereby removed.

    Issued: March 5, 1996.
Gordon J. Linton,
Administrator.
[FR Doc. 96-5670 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-57-P

Complete official Federal Register PDF

FR Doc. 96-5646 Endangered and Threatened Wildlife and Plants; Interim Listing Priority Guidance
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9651-9653]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5646]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 17

Endangered and Threatened Wildlife and Plants; Interim Listing 
Priority Guidance

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Notice of interim listing priority guidance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Fish and Wildlife Service (Service) adopts interim 
guidance for assigning relative priorities to listing actions conducted 
under section 4 of the Endangered Species Act (Act). Congress enacted a 
moratorium on final listings and critical habitat designations in April 
1995 which, combined with severe funding constraints, essentially shut 
down the Service's listing program beginning in October 1995. During 
this shutdown, a large backlog of listing actions, particularly 
unresolved proposed listings, is accruing. When the moratorium is 
lifted and adequate funding is restored to operate a listing program, 
the Service will need to act expeditiously to resolve the status of 
outstanding proposed listings. This guidance supplements, but does not 
replace, the current listing priority guidelines, which are silent on 
the matter of prioritizing among different types of listing activities. 
While the backlog exists, and in order to focus conservation benefits 
on those species in greatest need, the Service believes that processing 
the outstanding proposed listings should receive higher priority than 
other actions authorized by section 4 (such as petition findings, new 
proposed listings, and critical habitat determinations).

DATES: This guidance takes effect March 11, 1996. Comments on this 
guidance will be accepted until April 10, 1996. This interim guidance 
will remain in effect until September 30, 1996, unless extended by 
further notice.

ADDRESSES: Comments on this interim guidance should be addressed to the 
Chief, Division of Endangered Species, U.S. Fish and Wildlife Service, 
1849 C Street NW., Mailstop ARLSQ-452, Washington, DC 20240.

FOR FURTHER INFORMATION CONTACT: E. LaVerne Smith, Chief, Division of 
Endangered Species, U.S. Fish and Wildlife Service, 703-358-2171 (see 
ADDRESSES section).

SUPPLEMENTARY INFORMATION:

Background

    The Service adopted guidelines on September 21, 1983 (48 FR 43098-
43105) that govern the assignment of priorities to species under 
consideration for listing as endangered or threatened under section 4 
of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et 
seq.). The Service adopted those guidelines to establish a rational 
system for allocating available appropriations to the highest priority 
species when adding species to the lists of endangered or threatened 
wildlife and plants or reclassifying threatened species to endangered 
status. The system places greatest importance on the immediacy and 
magnitude of threats, but also factors in the level of taxonomic 
distinctiveness by assigning priority in descending order to monotypic 
genera, full species, and subspecies (or equivalently, distinct 
population segments of vertebrates).
    The enactment of Public Law 104-6 in April, 1995 rescinded $1.5 
million from the Service's budget for carrying out listing activities 
through the remainder of Fiscal Year 1995. Public Law 104-6 also 
contained a prohibition on the expenditure of the remaining 
appropriated funds for final determinations to list species or 
designate critical habitat which, in effect, placed a moratorium on 
those activities.
    Since the end of Fiscal Year 1995, funding for the Service's 
endangered species programs, including listing of endangered and 
threatened species, has been provided through a series of continuing 
resolutions, each of which has maintained in force the moratorium 
against issuing final listings or critical habitat designations. The 
continuing resolutions also severely reduced or eliminated the funding 
available for the Service's listing program. Consequently, the Service 
reassigned listing program personnel to other duties. The net effect of 
these legislative and administrative actions is that the Service's 
listing program has been essentially shut down since October 1995, and 
will remain so until adequate funding is restored. The moratorium and 
severe funding restrictions have created problems that require 
additional guidance.
    When adequate appropriations are provided by the Congress for the 
administration of a listing program and when the listing program is no 
longer restricted by moratoria or similar conditions, the Service will 
face the considerable task of restaffing its listing program and 
allocating the available resources to the following listing activities 
that have accrued significant backlogs. First, the Service has issued 
proposed listings for 243 species, which require final decisions. 
Second, although the moratorium imposed by Pub. L. 104-6 does not 
specifically extend to petition processing or the development of new 
proposed listings, the extremely limited funding available to the 
Service for listing activities has generally precluded these actions 
since October 1, 1995. However, during this period the Service has 
continued to receive new petitions and now has a backlog of petitions 
that request the listing or delisting of 41 species under section 
4(b)(3) of the Act. Third, the Service is required by numerous court 
orders or settlement agreements to process a variety of actions under 
section 4 of the Act. Fourth, the Service also needs to make 
expeditious progress on determining the conservation status of the 182 
species designated by the Service as candidates for listing in the 
recently published Candidate Notice of Review (61 FR 7596; February 28, 
1996). These backlogs and court orders illustrate the need for program-
wide priorities to guide the allocation of resources once the listing 
program is revived. For the above reasons, good cause exists to make 
this guidance effective immediately.
    Section 4(b)(1) of the Act requires the Service to use the ``best 
available scientific and commercial information'' to determine those 
species in need of the Act's protections. It has been long-standing 
Service policy that the order in 

[[Page 9652]]
which species should be processed for listing is based primarily on the 
immediacy and magnitude of the threats they face. Given the large 
backlogs of proposed species, petitions, and candidate species awaiting 
proposal, it will be extremely important for the Service to focus its 
efforts on actions that will provide the greatest conservation benefits 
to imperiled species in the most expeditious manner.
    The Service will continue to base decisions regarding the order in 
which species will be proposed or listed on the 1983 listing priority 
guidelines. These decisions will be implemented by the Regional Office 
designated with lead responsibility for the particular species. The 
Service allocates its listing appropriation among the Regional Offices 
based primarily on the number of proposed and candidate species for 
which the Region has lead responsibility. This ensures that those areas 
of the country with the largest percentage of known imperiled biota 
will receive a correspondingly high level of listing resources. The 
1983 listing priority guidelines and this guidance will be applied at 
the National, Regional, and local levels.
    While funding for listing activities is allocated based on expected 
workload, the types of activities composing each Region's listing 
workload vary greatly. As a result, Regions with few outstanding 
proposed listings may be able to process new proposed listings or 
petition findings before all of the outstanding proposed listings have 
been processed in Regions with large numbers of outstanding proposed 
listings.
    To address the biological, budgetary, and administrative issues 
noted above, the Service therefore adopts the following interim listing 
priority guidance.

Interim Listing Priority Guidance

    The Headquarters Office will promptly process any draft petition 
findings, draft proposed rules or final rules (once the moratorium is 
lifted) to add species to the lists, draft proposed or final critical 
habitat determinations (once the moratorium is lifted), or draft 
withdrawal notices that could not be processed because of the funding 
constraints or the moratorium. This will only apply to draft documents 
already approved by the Field and Regional Offices but for which final 
action could not be completed per guidance issued by the Director.
    The following sections describe a multi-tiered approach that 
assigns relative priorities, on a descending basis, to actions to be 
carried out under section 4 of the Act. The various types of actions 
within each tier (such as new proposed listings, administrative 
petition findings, etc.) will be accorded roughly equal priority, but 
the 1983 listing priority guidelines should be used as applicable. The 
Service emphasizes that this guidance is effective until September 30, 
1996 (unless extended by future notice) and the agency fully 
anticipates returning to a more balanced implementation of the Act's 
listing responsibilities to concurrently process petition findings and 
proposed and final listings and critical habitat determinations, after 
funding has been restored and the backlogs reduced.

Tier 1--Emergency Listing Actions

    Once the moratorium is lifted, the Service will immediately process 
emergency listings for species that face an imminent risk of extinction 
under the emergency listing provisions of section 4(b)(7) of the Act 
and will prepare a proposed listing immediately upon learning of the 
need to emergency list. This provision will also apply to any 
petitioned species for which the Service deems an emergency situation 
exists.

Tier 2--Processing Final Decisions on Proposed Listings (Applies After 
the Moratorium is Lifted)

    In issuing the outstanding proposed listings, the Service deemed 
that the vast majority of the proposed species faced high-magnitude 
threats. The Service believes that focusing efforts on making final 
decisions relative to these proposed species will provide maximum 
conservation benefits to those species that are in greatest need of the 
Act's protections.

Tier 3--Processing New Proposed Listings for Species Facing High-
Magnitude Threats (Listing Priority Numbers 1 through 6) and Initial 
Screening of Petitions

    While the backlog of candidate species has been reduced 
substantially since 1992, the Service has determined that 182 species 
warrant issuance of proposed listings. The Act directs the Service to 
make ``expeditious progress'' in adding new species to the lists and 
thereby necessitates steady work in reducing the number of outstanding 
candidate species. Issuance of new proposed listings is the first 
formal step in the regulatory process for listing a species. Many 
candidate species face high-magnitude threats and the need to start the 
regulatory process justifies placement of this activity in Tier 3.
    The Service will conduct a preliminary review of any petition to 
list a species or change a threatened species to endangered status to 
determine if an emergency situation exists or if the species would 
probably be assigned a high listing priority upon completion of a 
status review. If the initial screening indicates an emergency 
situation the action will be elevated to Tier 1. If the initial 
screening indicates a species that probably faces high-magnitude 
threats, processing of the petition will be assigned to Tier 3.

Tier 4--Processing new Proposed Rules for Species Facing Moderate- or 
Low-Magnitude Threats; Processing Administrative Findings on Petitions 
not Assigned to Tiers 1 or 3; and Processing Final Decisions on 
Proposed Delistings or Reclassifications

    Processing of new proposed rules for species facing moderate- or 
low-magnitude threats would provide less conservation benefit than 
actions described in Tiers 1 through 3, so the Service is assigning 
this activity to Tier 4.
    Administrative findings for petitions that are not assigned to 
Tiers 1 or 3 after initial screening will be processed as a Tier 4 
priority but only to the extent that such action does not substantially 
deter from the Service's ability to deal with the backlog of proposed 
listings.
    Processing of final decisions for previously proposed delistings 
and reclassifications provides relief from unnecessary regulations. The 
Service believes that providing such regulatory relief is an 
appropriate Tier 4 activity.

Tier 5-- Processing Critical Habitat Determinations and Processing new 
Proposed Delistings or Reclassifications

    Designation of critical habitat consumes large amounts of the 
Service's listing appropriation and generally provides only limited 
conservation benefits beyond those achieved when a species is listed as 
endangered or threatened. Because critical habitat protections are 
restricted to Federal actions, situations where designating critical 
habitat provides additional protection beyond the protections included 
in section 7 are rare. It is critical during this interim period to 
maximize the conservation benefit of every dollar spent in the listing 
activity. The small amount of additional protection that is gained by 
designating critical habitat for species that are already on the lists 
is greatly outweighed by providing the protections included in sections 
7 and 9 to newly-listed species. Therefore, the Service will place 
higher priority on 

[[Page 9653]]
addressing species that presently have no protection under the Act 
rather than devoting limited resources to the expensive process of 
designating critical habitat for species already protected by the Act.
    Issuing new proposed delistings and downlistings can provide 
regulatory relief but will be accorded Tier 5 priority due to limited 
listing resources and the fact that such actions will not become 
effective in the immediate future.

Setting Priorities Within Tier 2

    Most of the outstanding proposed listings deal with species that 
face high-magnitude threats, such that additional guidance is needed to 
clarify the relative priorities within Tier 2. Proposed rules dealing 
with taxa deemed to face imminent, high-magnitude threats will have the 
highest priority within Tier 2. The Service will promptly review the 
backlog of 243 proposed species and each Region will reevaluate the 
immediacy and magnitude of threats facing all species that have been 
proposed for listing and revise the species' listing priority 
assignments accordingly. Those with the highest listing priority will 
be processed first.
    Proposed listings that cover multiple species facing high-magnitude 
threats will have priority over single-species proposed rules unless 
the Service has reason to believe that the single-species proposal 
should be processed to avoid possible extinction.
    Due to unresolved questions or to the length of time since 
proposal, the Service may determine that additional public comment or 
hearings are necessary before issuing a final decision for Tier 2 
actions. Proposed listings for species facing high-magnitude threats 
that can be quickly completed (based on factors such as few public 
comments to address or final decisions that were almost complete prior 
to the moratorium) will have higher priority than proposed rules for 
species with equivalent listing priorities that still require extensive 
work to complete.
    Given species with equivalent listing priorities and the factors 
previously discussed being equal, proposed listings with the oldest 
dates of issue should be processed first.

Notifying the Courts on Matters in Litigation

    The Service will assess the status and the relative priority of all 
section 4 petition and rule-making activities that are the subject of 
active litigation using this interim guidance and the 1983 listing 
priority guidelines. The Service, through the Office of the Solicitor, 
will then notify the Justice Department of its priority determination 
and request that appropriate relief be requested from each district 
court to allow those species with the highest biological priority to be 
addressed first. The Service will provide periodic updates to each 
district court on the progress that it is making in addressing high 
priority proposed and candidate species. However, to the extent that 
these efforts to uphold the Service's interim priority guidance and the 
1983 listing priority guidelines do not receive deference in the 
Courts, the Service will need to comply with court orders despite any 
conservation disruption that may result.
    The Service will not elevate the priority of proposed listings for 
species under active litigation. To do so would let litigants, rather 
than expert biological judgments, control the setting of listing 
priorities. The Regional Office with responsibility for processing such 
packages will need to determine the relative priority of such cases 
based upon this guidance and the 1983 listing priority guidelines and 
furnish supporting documentation that can be submitted to the relevant 
Court to indicate where such species fall in the overall priority 
scheme.

Public Comments Solicited

    The Service intends that any action resulting from this guidance be 
as accurate and as effective as possible. Therefore, any comments or 
suggestions from the public, other concerned governmental agencies, the 
scientific community, industry, commercial trade entities, or any other 
interested party concerning any aspect of this guidance are hereby 
solicited. While the guidance will be used immediately, the Service 
will take into consideration the comments and any additional 
information received. Such communications may lead to the adoption of 
additional or revised guidance that differs from this interim guidance.

Authority

    The authority for this notice is the Endangered Species Act of 
1973, as amended, 16 U.S.C. 1531 et seq.

    Dated: March 1, 1996.
John G. Rogers,
Acting Director, U.S. Fish and Wildlife Service.
[FR Doc. 96-5646 Filed 3-8-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

FR Doc. 96-5525 Airworthiness Directives; Jetstream Model 4101 Airplanes
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9606-9607]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5525]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-71-AD; Amendment 39-9536; AD 94-24-09 R1]

Airworthiness Directives; Jetstream Model 4101 Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment revises an existing airworthiness directive 
(AD), applicable to certain Jetstream Model 4101 airplanes, that 
currently requires repetitive inspections to detect damage to the 
overwing fairings, and replacement or repair of structurally damaged 
fairings. That AD was prompted by a report indicating that an overwing 
fairing detached from an airplane. The actions specified by that AD are 
intended to prevent reduced controllability of the airplane due to loss 
of an overwing fairing. This amendment adds an optional terminating 
action for the currently required inspections, and limits the 
applicability of the rule.

DATES: Effective April 10, 1996.
    The incorporation by reference of Jetstream Alert Service Bulletin 
J41-53-028, Revision 2, dated January 17, 1995, as listed in the 
regulations, is approved by the Director of the Federal Register as of 
April 10, 1996.
    The incorporation by reference of Jetstream Alert Service Bulletin 
J41-53-028, Revision 1, dated October 12, 1994, as listed in the 
regulations, was approved previously by the Director of the Federal 
Register as of December 14, 1995 (59 FR 60891, November 29, 1994).

ADDRESSES: The service information referenced in this AD may be 
obtained from Jetstream Aircraft, Inc., P.O. Box 16029, Dulles 
International Airport, Washington, DC 20041-6029. This information may 
be examined at the Federal Aviation Administration (FAA), Transport 
Airplane Directorate, Rules Docket, 1601 Lind Avenue, SW., Renton, 
Washington; or at the Office of the Federal Register, 800 North Capitol 
Street, NW., suite 700, Washington, DC.

FOR FURTHER INFORMATION CONTACT: William Schroeder, Aerospace Engineer, 
Standardization Branch, ANM-113, FAA, Transport Airplane Directorate, 
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (206) 
227-2148; fax (206) 227-1149.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) by revising AD 94-24-09, 
amendment 39-9082 (59 FR 60891, November 29, 1994), which is applicable 
to certain Jetstream Model 4101 airplanes, was published in the Federal 
Register on October 11, 1995 (60 FR 52870). The action proposed to 
revise AD 94-24-09 to continue to require repetitive inspections to 
detect damage to the overwing fairings, and replacement or repair of 
structurally damaged fairings. The action also proposed to provide an 
optional terminating action for the repetitive inspections.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the single comment received.
    The commenter supports the proposed rule.
    After careful review of the available data, including the comment 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule as proposed.
    The FAA estimates that 14 airplanes of U.S. registry will be 
affected by this AD.
    The inspections currently required by AD 94-24-09 take 
approximately 0.25 work hour per airplane to accomplish, at an average 
labor rate of $60 per work hour. Based on these figures, the cost 
impact of the current inspection requirements of this AD on U.S. 
operators is estimated to be $210, or $15 per airplane, per inspection.
    Should an operator elect to install the optional terminating 
modification, it will take approximately 20 work hours to accomplish, 
at an average labor rate of $60 per work hour. Required parts will cost 
approximately $7,300 per airplane. Based on these figures, the cost 
impact of this optional terminating modification on U.S. operators is 
estimated to be $8,500 per airplane.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows: 

[[Page 9607]]

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing amendment 39-9082 (59 FR 
60891, November 29, 1994), and by adding a new airworthiness directive 
(AD), amendment 39-9536, to read as follows:

94-24-09 R1 Jetstream Aircraft Limited: Amendment 39-9536. Docket 
95-NM-71-AD. Revises AD 94-24-09, Amendment 39-9082.

    Applicability: Model 4101 airplanes; constructor's number 41004 
and subsequent; on which Modification JM41392 has not been installed 
(either during production or in accordance with Jetstream Service 
Bulletin J41-53-031); certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (c) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent reduced controllability of the airplane, accomplish 
the following:
    (a) Within 7 days after December 14, 1994 (the effective date of 
AD 94-24-09, amendment 39-9082), perform a detailed visual 
inspection to detect structural damage (such as creasing, cracking, 
or holes) to the left (Part 1) and right (Part 2) overwing fairings, 
in accordance with Jetstream Alert Service Bulletin J41-53-028, 
Revision 1, dated October 12, 1994; or Revision 2, dated January17, 
1995.
    (1) If no structural damage is detected, repeat the inspection 
thereafter at intervals not to exceed 7 days.
    (2) If creasing or cracking is detected, prior to further 
flight, inspect and repair it, in accordance with the alert service 
bulletin. Repeat the inspection thereafter at intervals not to 
exceed 300 hours time-in-service.

    Note 2: Jetstream Alert Service Bulletin J41-53-028 references 
British Aerospace Public Limited Company Drawing 141R0700, Issue 3, 
dated September 14, 1994, and British Aerospace Public Limited 
Company Drawing 141R0705, Issue 2, dated September 22, 1994, for 
repair and inspection procedures.
    (3) If holes are detected, prior to further flight, repair in 
accordance with the Jetstream Series 4100 Structural Repair Manual. 
Repeat the inspection thereafter at intervals not to exceed 300 
hours time-in-service.
    (b) Installation of Modification No. JM41392, Parts 1 and 2, in 
accordance with Jetstream Service Bulletin J41-53-031, dated 
November 22, 1994, constitutes terminating action for the 
inspections required by paragraph (a) of this AD.
    (c) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Standardization Branch, ANM-113, 
FAA, Transport Airplane Directorate. Operators shall submit their 
requests through an appropriate FAA Principal Maintenance Inspector, 
who may add comments and then send it to the Manager, 
Standardization Branch, ANM-113.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Standardization Branch, ANM-113.

    (d) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (e) The inspections and repair shall be done in accordance with 
Jetstream Alert Service Bulletin J41-53-028, Revision 1, dated 
October 12, 1994; or Jetstream Alert Service Bulletin J41-53-028, 
Revision 2, dated January 17, 1995, which contains the following 
list of effectives pages:

------------------------------------------------------------------------
                                    Revision level                      
            Page No.                 shown on page    Date shown on page
------------------------------------------------------------------------
1, 3, 5, 6-.....................  2.................  January 17, 1995. 
2, 4, 7, 8-.....................  Original..........  September 22,     
                                                       1994.            
------------------------------------------------------------------------

    The incorporation by reference of Jetstream Alert Service Bulletin 
J41-53-028, Revision 1, dated October 12, 1994, was previously approved 
by the Director of the Federal Register in accordance with 5 U.S.C. 
552(a) and 1 CFR part 51 as of December 14, 1995 (59 FR 60891, November 
29, 1994). The incorporation by reference of Jetstream Alert Service 
Bulletin J41-53-028, Revision 2, dated January 17, 1995, is approved by 
the Director of the Federal Register in accordance with 5 U.S.C. 552(a) 
and 1 CFR part 51. Copies may be obtained from Jetstream Aircraft, 
Inc., P.O. Box 16029, Dulles International Airport, Washington, DC 
20041-6029. Copies may be inspected at the FAA, Transport Airplane 
Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the 
Office of the Federal Register, 800 North Capitol Street, NW., suite 
700, Washington, DC.
    (f) This amendment becomes effective on April 10, 1996.

    Issued in Renton, Washington, on March 4, 1996.
James V. Devany,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-5525 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9764-9846]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5453]

[[Page 9763]]

_______________________________________________________________________

Part III

Department of Labor

_______________________________________________________________________

Mine Safety and Health Administration

_______________________________________________________________________

30 CFR Part 75

Safety Standards for Underground Coal Mine Ventilation; Final Rule

Federal Register / Vol. 61, No. 48 / Monday, March 11, 1996 / Rules 
and Regulations 

[[Page 9764]]

DEPARTMENT OF LABOR

Mine Safety and Health Administration

30 CFR Part 75

RIN 1219-AA11

Safety Standards for Underground Coal Mine Ventilation

AGENCY: Mine Safety and Health Administration, (MSHA) Labor.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This final rule revises the Mine Safety and Health 
Administration's (MSHA's) existing safety standards for ventilation of 
underground coal mines. After publication of the existing standards, 
the U.S. Court of Appeals in the D.C. Circuit stayed the application of 
one standard and MSHA stayed two standards. The rule revises these 
stayed provisions, revises or clarifies other provisions in the rule 
and includes some new provisions. The provisions of the final rule are 
expected to decrease the potential for fatalities, particularly 
accidents which can result in multiple deaths, and to reduce the risk 
of injuries and illnesses in underground coal mines. For the 
convenience of the reader, MSHA has published the full text of the 
ventilation standards for underground coal mines in this document.

EFFECTIVE DATE: The final rule is effective June 10, 1996.

FOR FURTHER INFORMATION CONTACT: Patricia W. Silvey, Director, Office 
of Standards, Regulations and Variances, MSHA, phone 703/ 235-1910; fax 
703/235-5551.

SUPPLEMENTARY INFORMATION:

I. Background

    The mining of coal underground has historically been recognized as 
one of the more hazardous occupations in the world. It is a universally 
recognized principle of underground coal mine safety that there must be 
proper ventilation of the mine. Indeed, no aspect of safety in 
underground coal mining is more fundamental than proper ventilation. A 
basic tenet of mining safety states that ventilation must be 
sufficient: (1) To dilute, render harmless and carry away the hazardous 
components of mine air, such as potentially explosive methane; and (2) 
to provide necessary levels of oxygen to the miners' working 
environment. Ventilation safety programs are designed around this 
philosophy. The history of mining is replete with tragic incidents 
where one aspect or another of a necessary ventilation safety 
protection was either not in place or not followed, with disastrous 
results. Examples include the explosion at the Monogah mine in 1907 in 
which 362 miners perished, the worst mining disaster in the history of 
the United States. Other more recent examples include the Farmington 
disaster in 1968 in which 78 miners died, the Scotia mine in 1976 where 
26 died, Grundy No. 17 in 1981 where 13 died, Wilberg in 1984 where 27 
died, Pyro in 1989 with 10 deaths and Southmountain in 1992 where 8 
miners died. In 1969 and again in 1977, Congress recognized the hazards 
of improper ventilation and established a role for the government in 
addressing ventilation hazards. MSHA, with the cooperation of labor and 
industry, has met with a large measure of success in reducing the 
accidents, injuries and fatalities that have resulted from poor 
ventilation practices. For example, explosions and fires in a 29 year 
period from 1940 to 1968 resulted in the deaths of 491 miners. Since 
the passage of the Federal Coal Mine Health and Safety Act of 1969, 178 
explosion and fire related deaths have occurred. While MSHA recognizes 
that this number is still unacceptable, the significant reduction in 
loss of life cannot be ignored. To a great extent, the framework for 
this success has been the implementation of effective ventilation 
standards.
    Preventing recurrence of disasters like those of the past remains 
the top priority of MSHA. MSHA believes that a serious commitment by 
management, labor, and government is necessary to develop effective, 
yet reasonable and practical regulations that protect the safety and 
health of our nation's miners. MSHA anticipates that this rulemaking, 
which revises portions of the comprehensive ventilation rule published 
in 1992 (57 FR 20868, May 15, 1992) and adds new provisions, will bring 
the coal mining industry closer to that objective.
    The comprehensive 1992 ventilation rulemaking was closely followed 
by interested industry and labor groups, who frequently expressed 
divergent views on approaches to resolving ventilation issues. Certain 
commenters exercised their right to challenge the rule and the U.S. 
Court of Appeals for the D.C. Circuit Court stayed one provision 
relating to oxygen and carbon dioxide in the bleeder entries. MSHA held 
a series of informational meetings around the country during which it 
explained the application of the rule. In so doing, MSHA listened to 
many questions about the implementation of the rule. MSHA was sensitive 
to the views expressed at these meetings and gave serious consideration 
to these issues. Some of these comments became the basis for portions 
of this rulemaking. Internal discussions of MSHA's experience with the 
implementation of the rule led MSHA to include still other issues in 
this rulemaking. In fact, MSHA stayed the application of two additional 
provisions in response to potential problems pointed out by interested 
parties. These stayed provisions relate to actions following the 
stoppage of the main mine fan with persons underground and to a 
potential fire hazard from the enclosure of compressors in a 
noncombustible structure. MSHA addresses these issues in the 
rulemaking. Once MSHA decided that it was going to proceed with a 
rulemaking to address these issues, it added other provisions to the 
package to allow all parties an opportunity to comment where they 
expressed the view that they had insufficient opportunity to comment on 
the existing rule (The comprehensive rule that was published in the 
Federal Register on May 15, 1992). The rule MSHA proposed also included 
issues raised by parties in litigation challenging the existing rule. 
MSHA anticipates that the final rule should resolve matters included in 
the challenge raised by the litigation of the existing rule. Finally, 
in an effort to address confusion that seemed to exist with certain 
provisions of the existing ventilation rule promulgated in May of 1992, 
MSHA either proposed clarifications to the existing rule or discussed 
the affected provisions in the preambles to the proposed and final 
rules in an effort to clarify them.
    The issues in the rulemaking are complex and highly technical. 
Comments to the proposal (published on May 19, 1994, 59 FR 26536) and 
comments following the public hearings (held in September and October 
1994, in Price, Utah, Logan, West Virginia, and Washington, 
Pennsylvania) were extensive. One party alone submitted over two 
thousand pages of written comments and over 275 exhibits. Not only were 
the safety issues involved complex, but in many cases, MSHA's task was 
made more difficult by hearing diametrically opposed viewpoints.

Major Improvements in the Final Rule

    The final rule provides a number of significant improvements to the 
existing ventilation regulations. For example, the final rule provides 
for the electronic storage of records. A major portion of the mining 
industry has this capability at the present time through computer 
technology at the mine site. Electronic 

[[Page 9765]]
record retention can reduce the cost of storage and maintenance of 
records and provide for ease in access and transfer of information 
without reducing the protection afforded miners. Additionally, having 
records electronically stored can facilitate trend analysis, allowing 
for earlier detection and correction of potential hazards.
    The final rule also requires pressure recorders or an option of the 
use of a fan monitoring system on main mine fans at all mines. This 
represents a major step toward monitoring the mine fans controlling the 
ventilation at the mines and helps assure that the miners have 
uncontaminated air at all times. The final rule also provides for 
methane testing at the face during mining operations. This technology 
is especially useful for taking methane tests during extended cut 
mining operations. The methane testing evaluates air flow to the face 
to determine that methane is sufficiently diluted, rendered harmless, 
and carried away so as to reduce or eliminate the hazards associated 
with methane liberated during mining operations.
    Other improvements in the rule include revisions to the three 
stayed provisions in the existing rule. Air quality levels for oxygen 
and carbon dioxide in bleeders are established to protect mine 
examiners who are required to travel to determine if the bleeders are 
functioning properly. A second stayed provision is revised to limit the 
use of transportation equipment during the withdrawal of miners after 
an unintentional fan stoppage. This revision to the existing rule 
reduces the likelihood of an ignition from methane that can accumulate 
during the fan stoppage. The third stayed provision is revised to allow 
the option of attending rather than housing compressors in a 
noncombustible enclosure. The hazards associated with the operation of 
compressors in underground mines were demonstrated at the Wilberg mine 
disaster, where 27 people lost their lives as a result of a compressor 
fire.
    This final rule provides for an alert and alarm device to be 
located outside of noncombustible structures housing electrical 
installations. The alert and alarm assures that miners are made aware 
of a problem in time to extinguish a fire or safely evacuate an area or 
the mine as necessary for safety. Another change to the existing rule 
involves miners or their representatives in the mine ventilation plan 
approval process before the plan is submitted for approval. This 
provides for the opportunity for input from those having first hand 
knowledge in the particular mining conditions and practices that impact 
the plan approval.
    Other safety enhancements from the existing rule include: requiring 
the use of extendable probes to conduct methane tests at deep cuts; 
requiring on-shift examinations on other than coal producing shifts; 
and accepting a performance test to determine minimum dimensions at 
certain locations in escapeways.
    Finally, the final rule clarifies existing regulations that were 
considered vague by some parties or were misunderstood. For example, 
the final rule provides that certified pumpers can conduct their own 
examination rather than requiring the examination to be conducted 
during the preshift segment of the mining operation.
    To serve the interests of the mining community, MSHA has 
republished the full text of subpart D of 30 CFR part 75 as it will 
read upon promulgation of this rule.

II. Discussion of the Final Rule

A. General Discussion

    In developing the final rule, MSHA has made every effort to address 
the comments received during the rulemaking, and to develop practical 
requirements for real safety problems. Both the costs and the benefits 
of each standard were also considered. In addition, each standard, as 
well as revisions and deletions, was carefully considered against the 
statutory requirement that nothing in the final rule shall reduce the 
protection afforded miners by an existing mandatory health or safety 
standard. Where appropriate, MSHA has provided for a phase in period to 
allow mine operators time to effectively plan and implement the 
necessary changes.
    MSHA carefully analyzed the comments received and responded in many 
instances by revising the proposed requirements. For example, unlike 
the proposal, the final rule does not require the second level 
countersigning of records; allows the use of nonpermissible equipment 
when conducting an examination upon restart of a fan following 
unintentional fan stoppages, and requires pressure recording devices or 
an option of the use of a fan monitoring system to be used on all main 
mine fans.
    Several commenters strongly urged MSHA to proceed in this 
rulemaking on the issue of using air coursed through the belt entries 
(``belt air'') to ventilate the working face. MSHA has completed its 
consideration of the Report of the Secretary's Advisory Committee 
Report on Belt Air and has placed the issue of using belt air to 
ventilate the working face on the rulemaking agenda for development of 
a proposed rule. Thus, ``belt air'' is not addressed in this 
rulemaking.
    MSHA has also received comments and recommendations on a number of 
other issues that are outside the scope of this rulemaking. For 
example, much of the extensive testimony directed toward the use of 
atmospheric monitoring systems was beyond the issues dealt with in this 
rulemaking. Also, recommendations for the use of transparent or 
translucent material for check curtains exceed the scope of this 
rulemaking. The final rule, therefore, does not include these 
recommendations.
    Commenters to the proposal frequently included a discussion of 
various accident reports, most written by MSHA. In addition, there were 
discussions of other documents related to specific incidents or mines, 
such as MSHA Internal Review Reports or specific mine plans. In some 
cases, the documents were submitted for inclusion in the record. In 
other cases, the documents were merely referenced.
    MSHA is independently aware of the extensive history of ventilation 
related explosions, and has considered this information. Where 
appropriate, this information is discussed in the section-by-section 
analysis in the preamble of this rule. MSHA is aware that accidents can 
result from or be contributed to by the violation of one or more of the 
existing standards. In that context, MSHA has found that the solution 
is not necessarily to promulgate another standard. (The offender may be 
as likely to ignore it as well.) Instead, for demonstrated 
noncompliance with existing standards, the solution is often found in 
increased emphasis, training, or enforcement, rather than in the 
promulgation of additional rules.
    Several sections of the final rule deal with requirements for 
sections and areas where mechanized mining equipment is being installed 
or removed. These provisions, which were included in the existing 
standard published in May 1992, were reproposed without change for the 
purpose of receiving additional comments from all interested parties. 
One commenter cited the William Station mine explosion as evidence of 
the need for these requirements. Other commenters reiterated an earlier 
objection that the standards were procedurally flawed. MSHA does not 
agree that these provisions are procedurally flawed and notes that each 
of these standards was reproposed and not simply restated as part of 
this rulemaking. Comments relative to the 

[[Page 9766]]
technical merits of an individual standard are addressed in the 
section-by-section portion of this preamble.

Recordkeeping Requirements in the Final Rule

    The final rule revises the recordkeeping requirements for several 
standards. The standards affected are Sec. 75.310, Installation of main 
mine fans; Sec. 75.312, Main mine fan examinations and records; 
Sec. 75.342, Methane monitors; Sec. 75.360, Preshift examination; 
Sec. 75.362, On-shift examination; Sec. 75.363, Hazardous conditions; 
posting, correcting and recording; Sec. 75.364, Weekly examinations; 
and Sec. 75.370, Mine ventilation plan; contents.
    Generally, the final rule requires examiners to record the results 
of methane tests as a percent of methane detected; records must be made 
in a book that is secure and not susceptible to alteration, or 
electronically in such a manner as to be secure and not susceptible to 
alteration; and records must be countersigned by the mine foreman by 
the end of the mine foreman's next regularly scheduled working shift. 
These rules are intended to assure that examination results are 
maintained and made available, and that the appropriate level of mine 
management is made aware of conditions or problems requiring attention. 
The revisions also help assure the integrity of records and enable mine 
management to review the quality of the examinations. MSHA intends the 
term ``secure and not susceptible to alteration'' when applied to 
electronic storage to mean that the stored record cannot be modified. 
One example of acceptable storage would be a ``write once, read many'' 
drive.
    Numerous comments were received both supporting and opposing the 
proposed recordkeeping requirements. MSHA reviewed and fully considered 
each of these comments. The proposal would have required that records 
be kept in either state-approved books or in bound books with 
sequential machine-numbered pages. Commenters argued that under the 
existing rule records may be falsified or altered. Commenters also 
stated that accident investigations have demonstrated the need for 
improved records. Other commenters asserted that the proposed 
requirement for bound books with sequential machine-numbered pages adds 
an economic burden for the majority of compliant operators and another 
way should be found, ``to foil the very few who are recalcitrant.'' 
Other commenters stated that since all records currently include dates 
and times, machine-numbered pages are unnecessary.
    Some record books that are currently in use and acceptable under 
the existing standards are vulnerable to misuse or manipulation. For 
example, under the existing rule, records could be kept in a spiral 
notebook or even a loose leaf binder. The final rule addresses this 
issue by requiring that records be made in books that are secure and 
not susceptible to alteration. Examples of books that are considered by 
MSHA to be secure and not susceptible to alteration include, but are 
not limited to, record books that are currently approved by state mine 
safety agencies, and permanently bound books. Examples of books that 
would not be considered books that are secure and not susceptible to 
alteration include loose leaf binders and spiral note books.
    Several commenters advocated the use of computers for the storage 
and retrieval of records. In support of this approach, the commenters 
cited computer records as being highly accurate, requiring less storage 
space and facilitating data retrieval. Other commenters expressed 
concern for the security of records stored electronically, and offered 
examples of breaches of security in record systems at banks and 
national security installations as evidence to support this concern.
    Electronic storage of information and assessing it through 
computers is more and more a common business practice generally and in 
the mining industry. Recognizing this trend, the final rule permits the 
use of electronically stored records provided they are secure and not 
susceptible to alteration, are able to capture the information and 
signatures required, and are accessible to the representative of the 
miners and the representatives of the Secretary. Based on the 
rulemaking record, MSHA believes that electronic records meeting these 
criteria are practical and as reliable as traditional records.
    In the preamble to the proposal, MSHA expressed its intent to 
require a hard copy printout of the information stored electronically 
to be available within 1 hour of a request, and to require backing up 
of the information within 24 hours. Commenters objected to making the 
records available within 1 hour as being too stringent and 
unnecessarily requiring a person to be on duty at all times. MSHA 
agrees that the requirement would be overly burdensome and has not 
included it in the final rule. Similarly, MSHA has not included a 
specific requirement for backing up the computer data. The final rule 
requires that the records be secure. This encompasses backing up the 
data as appropriate to the conditions and electronic storage system 
used at the mine. Upon reconsideration, MSHA has concluded that an 
additional specific requirement would be an unnecessary burden and has 
not included it in the rule.
    A variety of comments were received regarding the countersigning of 
certain records by the mine foreman, and the time frame permitted for 
countersigning. The final rule adopts the proposal that the mine 
foreman must countersign the record by the end of the mine foreman's 
next regularly scheduled working shift. The mine foreman is the person 
most responsible for the day-to-day operation of the mine. It is 
essential for the health and safety of the miners that the mine foreman 
be fully aware of the information contained in examination reports so 
as to be able to allocate resources to correct safety problems as they 
develop. Allowing until the end of the mine foreman's next regularly 
scheduled working shift to countersign the reports assures that the 
mine foreman is aware of the results of the examination in sufficient 
time to initiate corrective actions. In response to commenters, the 
final rule allows a mine official equivalent to a mine foreman to 
countersign the records.
    Some commenters suggested that the time for countersigning is 
unnecessarily long, and that the final rule should restore a previous 
requirement that countersigning be completed ``promptly.'' The term 
``promptly'' involves a level of ambiguity that is eliminated by 
specifying the time for countersigning records. The record does not 
show that the time set by the final rule would expose miners to safety 
or health risks. Also, hazardous conditions are required to be 
corrected immediately.
    Commenters suggested that the term ``mine foreman'' be replaced by 
a ``certified person responsible for ventilation of the mine or his 
designee.'' Another commenter suggested that the record could be 
countersigned by the mine foreman or any other mine official 
responsible for the day-to-day operation of the mine. Commenters stated 
that some operations no longer use the terms ``mine foreman'', ``mine 
manager,'' or ``superintendent.'' To provide for alternative management 
titles, the final rule incorporates the phrase ``or equivalent mine 
official.''
    Numerous comments were received regarding the requirement of the 
proposal for second level countersigning by the mine superintendent, 
mine manager, or other mine official to whom the mine foreman is 
directly accountable within 2 scheduled 

[[Page 9767]]
production days thereafter. Commenters objecting to the proposal stated 
that higher level management should be able to delegate responsibility, 
noting that often this level of official has more than one mine to 
oversee and may not necessarily be available within the proposed two 
days. One commenter suggested allowing three days for second level 
countersigning in order to recognize that such an official often has 
numerous obligations and to allow for normal absences. Other commenters 
simply recommended that the second level countersigning be deleted.
    Another commenter stated that some states hold the mine foreman 
legally responsible, that the mine foreman should correct hazardous 
conditions immediately and withdraw miners as appropriate, and that the 
second level countersigning would add no measure of safety. One 
commenter noted that in many cases the mine manager or superintendent 
is not a certified individual and long periods may elapse during which 
this person does not go underground. In these instances, the person 
countersigning would have little or no understanding or first hand 
knowledge of the conditions in the mine. Commenters stated that 
countersigning by the mine foreman is adequate notification to the 
operator of any deficiency and that the mine foreman has the necessary 
resources and responsibility to correct any situation noted in the 
records.
    Other commenters supported the proposal noting that second level 
countersigning would provide an additional level of accountability. 
These commenters also suggested that in the event of a major accident, 
the second level countersigning requirement would be important in fully 
assessing the contributing causes.
    MSHA has determined that countersigning by the mine foreman or 
equivalent mine official, as specified in the final rule, provides the 
means necessary to detect and correct developing hazards in a mine. 
Countersigning by the mine foreman assures the necessary notification 
to an official with the knowledge of the day-to-day operation of the 
mine having the authority to maintain the mine in a safe operating 
condition. Agency experience has demonstrated that higher level mine 
officials commonly lack hands-on involvement or in-depth knowledge of 
the specific conditions underground or how the highly detailed 
ventilation rules impact upon those conditions. Therefore, 
countersigning by a mine official at a higher level does not assure any 
additional level of safety and imposes an unnecessary burden.

B. Section-by-Section Discussion

    The following section-by-section portion of the preamble discusses 
each provision affected. The text of the final rule is included at the 
end of the document.

Section 75.301  Definitions

    The final rule revises the definition of return air to permit 
operators to designate certain air courses as return air courses for 
the purpose of ventilating structures, areas or installations that are 
required to be ventilated to return air courses and for ventilating 
seals when the air in the air course will not be used to ventilate 
working places. Thus, an operator wishing to split air off of an intake 
for the purpose of ventilating shops, electrical installations, or for 
other purposes, could designate the air course into which the split is 
directed as a return provided the air in the air course would not be 
used to ventilate working places or other locations, structures, 
installations or areas required to be ventilated with intake air. 
Commenters generally agreed with the change. However, one commenter 
expressed the concern that air currents ventilating electrical 
installations could be coursed to the conveyor belt entry before being 
coursed to a redesignated return air course, and thus not vented 
directly to a return. The commenter expressed the opinion that because 
the air is not vented directly to a return under this scenario, the 
rule would not permit this practice. MSHA does not agree with the 
commenter's interpretation and the final rule, consistent with 
Sec. 75.340, permits this practice.
    MSHA does not anticipate that operators will need to redesignate 
air courses on a routine basis. When questions arise as to the need to 
redesignate an intake as a return, the operator should contact the 
local MSHA office. In order that all interested persons are made aware 
when an air course is redesignated, the final rule requires in 
Sec. 75.372, Mine ventilation map, that such redesignated air courses 
be shown on the mine's ventilation map.

Section 75.310  Installation of Main Mine Fans

    The main mine fans serve a vital role in providing ventilation to 
prevent methane accumulations and possible explosions as well as 
providing miners with a healthful working environment. Section 75.310 
is primarily directed at protecting the main mine fans from fires and 
damage in the event of an underground explosion so that necessary 
ventilation can be maintained. Monitoring of the fans to assure that 
they are operating properly is an element of this protection. The final 
rule for Sec. 75.310 revises paragraphs (a) and (c) of the existing 
rule. The revisions address: (1) automatic signals for fan stoppage, 
(2) pressure recording devices, and (3) main mine fan monitoring 
systems.
    Paragraph (a)(3) of Sec. 75.310, like the proposal, requires each 
main mine fan to be equipped with an automatic device that gives a 
signal at the mine when the fan either slows or stops. The existing 
rule does not specify where the signal is to be given. Commenters 
supported the proposal stating that a signal alarming at a location 
away from the mine site would rely on overland communication lines to 
transmit the signal, with the person receiving the signal then 
notifying the mine. These overland communication lines are subject to 
weather and other potential sources of damage, which could result in a 
disruption of the communication. Other commenters objected to the 
proposal, however, stating that the ability of a mine operator to 
consolidate monitoring of several mines at one single location is a 
very efficient and cost-effective practice and should not be 
arbitrarily prohibited. Further, they stated that there would be 
absolutely no delay in contacting the miners from this central location 
should a fan malfunction occur. For clarity and for increased safety, 
the final rule requires that the signal be given at the mine. MSHA 
believes that in the case of a fan stoppage, this will assure more 
timely notice to miners, and hence, a more effective safety response. 
The requirement that the signal be given at a surface location at the 
mine does not preclude the signal from also being given elsewhere, such 
as at a central office, as long as it is given at the mine.
    Paragraph (a)(3) of Sec. 75.310 requires that a responsible person, 
designated by the operator, shall always be at a surface location at 
the mine where the signal can be seen or heard while anyone is 
underground. In addition, the responsible person must be provided with 
two-way communication with working sections and with other established 
locations where persons are normally assigned to work. Commenters 
supported the proposal stating that the changes provide clarification 
and specificity. Other commenters agreed with the proposed concept of 
two-way communication but felt that the wording, ``established 
locations where persons are normally assigned to work'' is ambiguous 
and subject to misinterpretation. Some commenters 

[[Page 9768]]
objected to the proposed requirement stating that (1) it is redundant 
of Sec. 75.1600 Communications; (2) properly the subject of a separate 
rulemaking under Sec. 75.1600 or; (3) it is vague, ambiguous, or 
subjective. Section 75.1600 only requires two-way communication between 
the surface and working sections and does not identify that this 
communication must be provided to a location where a person can see or 
hear the fan alarm signal. Commenters suggested that the requirement be 
revised to more specifically quantify locations where persons are 
normally assigned to work. MSHA recognizes that, as proposed, the 
standard might result in misinterpretation and the final rule has been 
reworded to read, ``* * * two-way communication with working sections 
and work stations where person(s) are routinely assigned to work for 
the majority of a shift.''
    Some, but not all, outby areas where two-way communication would be 
required by the final rule include; shops, attended belt transfer 
points, attended rail car loading points, and attended underground coal 
storage bins and hoppers. It is not intended that this communications 
capability be provided in areas where secondary roof support is being 
installed or where rock dust is being applied, or at unattended 
underground pumps, or in areas such as return air courses, bleeder 
entries and conveyor belt haulageways other than at belt transfer 
points. The requirement that two-way communication be provided to work 
stations where persons are routinely assigned to work for the majority 
of a shift is intended to help assure that these persons receive prompt 
notification of fan stoppages. Because these work stations are off the 
working section, a lack of communication capabilities could result in 
delays in notification and therefore delays in egress from the mine.
    Paragraph (a)(4) of the existing rule requires that main mine fans 
be equipped with a pressure recording device or with a main mine fan 
monitoring system but exempts from this requirement mines permitted to 
shut down main mine fans under Sec. 75.311.
    The final rule eliminates this exemption and requires that all main 
mine fans be equipped with a pressure recording device or a main mine 
fan monitoring device. For mines not currently required to have such a 
device, MSHA has provided for a 1 year phase in period to allow mine 
operators time to effectively plan and implement the necessary changes. 
One commenter suggested that all main mine fans at all mines be 
required to operate continually and further suggested that all main 
mine fans be equipped with pressure recording devices and main mine fan 
monitoring systems. In support of this suggestion, the commenter stated 
that continuous fan pressure recording devices would have a positive 
impact on safety at these operations. Such devices will provide 
necessary information to operators and miners at operations affected by 
this change. MSHA has not included one commenter's suggestion that main 
mine fan monitoring systems be required for all main mine fans. While 
MSHA supports and encourages the use of this advanced technology the 
Agency does not believe that it is appropriate to mandate it for all 
mines because daily fan examinations coupled with pressure recording 
devices have proved to be adequate over the years. Also, MSHA does not 
adopt a suggestion that main mine fans at all mines be required to 
operate continuously.
    Paragraph (a)(4) of the final rule requires that when a pressure 
monitoring device is used in lieu of a pressure recording device, it 
must produce a continuous graph or chart of the fan pressure. A hard 
copy of the continuous graph or chart must be printed at regular 
intervals of not more than 7 days. This provision permits the use of 
relatively recent advances in technology for monitoring main mine fan 
pressure provided a continuous record of the fan pressure is provided. 
In the proposal, MSHA specifically solicited comments as to an 
appropriate polling frequency that would provide a record that is 
substantially continuous. In response to this request, one commenter 
proposed that a polling frequency of two seconds is necessary to take 
full advantage of available technology. This commenter stated that 
continuously means constant or unbroken and that a continuous record 
should require a polling frequency of not greater than 2 seconds. 
Another commenter, an instrument manufacturer, suggested that a one 
minute sampling interval is definitely feasible. Main mine fan 
monitoring, when used, is often part of a more comprehensive mine-wide 
atmospheric monitoring system (AMS), and to require that the fan be 
polled every two seconds could delay the polling of other important 
sensors. Additionally, because these pressure monitoring devices are 
intended to be used in lieu of the traditional circular pressure 
recorder they must provide a substantially equivalent record. 
Experience by MSHA engineers following mine explosions and during more 
routine ventilation survey work has shown that the accuracy to which a 
7-day, circular recording chart of the type normally used can be read 
is on the order of several minutes. MSHA would expect that the polling 
frequency for a pressure recording device used in lieu of a pressure 
recorder would be no more than one (1) minute.
    MSHA received a number of comments in response to the proposed 
requirement in paragraph (a)(4) that when a pressure recording device 
other than a circular pressure recorder is used, a hard copy of the 
continuous graph or chart be generated at not more than 7-day 
intervals. Comments ranged from requiring daily printouts to not 
requiring any printout except when requested by an Authorized 
Representative of the Secretary. In response to these comments, the 
final rule retains the requirement for a hard copy of the continuous 
graph or chart be generated at not more than 7-day intervals. In light 
of MSHA's stated position to permit records of examinations to be 
stored electronically, the final rule permits the record of main mine 
fan pressure to be stored electronically provided the record is secure 
and not susceptible to alteration.
    Paragraph (c) of Sec. 75.310 specifies requirements for main mine 
fan monitoring systems if used under Sec. 75.312. Commenters suggested 
that the requirements were repetitive, confusing, and would discourage 
mine operators from using monitoring systems which could provide more 
protection. MSHA believes that the requirements in paragraph (c) are 
necessary to effectively monitor a fan, particularly when these systems 
are used in lieu of daily fan examinations.
    Paragraph (c)(3) of Sec. 75.310 of the proposal would have required 
that main mine fan monitoring systems provide, on demand, a printout of 
the monitored parameters, including the mine ventilating pressure. 
Several commenters objected to the requirement that a printout be 
provided ``on demand.'' As interpreted by these commenters, this 
standard would require that the operator provide a printout at any time 
it is requested. As explained in the preamble to the proposal, ``* * * 
the monitoring system would be required to have the capability of 
providing (emphasis added), on demand, a printout of the information 
being monitored. This capability is intended to facilitate the review 
of the information by mine management required in Sec. 75.312(b).'' The 
commenters misinterpreted the purpose for the standard. MSHA 
recognizes, 

[[Page 9769]]
however, the merits of being able to obtain a printout within a 
reasonable period of time. Therefore, the final rule requires that a 
main mine fan monitoring system used to satisfy the requirements of 
Sec. 75.312 provide a printout of the monitored parameters, including 
the mine ventilating pressure, within a reasonable period, not to 
exceed the end of the next scheduled shift during which miners are 
underground.
    Paragraph (c)(5) of Sec. 75.310 requires that two-way communication 
be provided between a surface location at the mine where the signals 
from the fan monitoring system can be seen or heard and working 
sections and other established locations where persons are normally 
assigned to work for the majority of the shift. Except for minor 
editorial changes, this requirement is the same as the proposal. 
Comments on this proposal were the same as comments on proposed 
paragraph (a)(3). Several commenters supported the proposal stating 
that the changes provide clarification and specificity. Other 
commenters agreed with the proposed concept of two-way communication 
but felt that the wording, ``established locations where persons are 
normally assigned to work'' is ambiguous and subject to 
misinterpretation. Some commenters objected to the proposed requirement 
stating that (1) it is redundant of Sec. 75.1600 Communications; (2) 
properly the subject of a separate rulemaking under Sec. 75.1600 or; 
(3) it is vague, ambiguous, or subjective. Section 75.1600 only 
requires two-way communication between the surface and working sections 
and does not identify that this communication must be provided to a 
location where a person can see or hear the fan alarm signal. 
Commenters suggested that the requirement be revised to more 
specifically quantify locations where persons are normally assigned to 
work. MSHA recognizes that, as proposed, the standard might result in 
misinterpretation and the final rule has reworded the proposal to read, 
``* * * two-way communication with working sections and work stations 
where person(s) are routinely assigned to work for the majority of a 
shift.''
    Some, but not all, outby areas where two-way communication would be 
required by the final rule include; shops, attended belt transfer 
points, attended rail car loading points, and attended underground coal 
storage bins and hoppers. It is not intended that this communications 
capability be provided in areas where secondary roof support is being 
installed or where rock dust is being applied, or at unattended 
underground pumps, or in areas such as return air courses, bleeder 
entries and conveyor belt haulageways other than at belt transfer 
points. The requirement that two-way communication be provided to work 
stations where persons are routinely assigned to work for the majority 
of a shift is intended to help assure that these persons receive prompt 
notification of fan stoppages or other problems with the fan that might 
require withdrawal of miners. Because these work stations are off the 
working section, a lack of communication capabilities could result in 
delays in notification and therefore delays in egress from the mine.

Section 75.311  Main Mine Fan Operation

    The main mine fan provides the pressure that causes air to move 
through the mine to dilute and carry away explosive and toxic gases, 
dusts and fumes. As such it is the most important part of the 
ventilation system. Section 75.311 requires fans to be continuously 
operated to provide constant ventilation to underground areas and 
specifies precautions for planned fan stoppages. It also addresses the 
repair of main mine fans, monitoring of fan signal devices on the 
surface, and protection against fires around fans and intake air 
openings.
    The final rule revises paragraph (d) of Sec. 75.311, which 
addresses the notification of mine officials of any unusual variance in 
mine ventilation pressure and requires the prompt repair of electrical 
or mechanical deficiencies. The final rule requires immediate 
notification and the prompt institution of corrective action or 
repairs.
    Commenters suggested deletion of the word ``unusual'' maintaining 
that this term makes the requirement vague and subject to different 
interpretations. These commenters suggested substituting the phrase, 
``that could materially affect the safety and health of persons in the 
mine'' to describe the type of pressure variance that would require 
action. In making this recommendation, the commenters cited similar 
language in existing Sec. 75.324(a)(1) that, according to the 
commenters, is understood throughout the coal mining community. Section 
75.324(a)(1) concerns alterations of the main ventilation air current 
or any split of the main air current. The final rule does not adopt 
this recommendation. Minor fluctuations in fan operating pressure are 
normal; however, unusual changes can be indications of changes in fan 
operation or changes underground, such as roof falls or loss of 
ventilation controls, that require prompt attention and corrective 
action. In addition, MSHA has 25 years of experience with the phrase 
``unusual variances in mine ventilation pressure'' and is unaware of 
significant difficulties with this terminology.
    Commenters questioned what constitutes an ``electrical or 
mechanical deficiency'' for the purposes of Sec. 75.311. The purpose of 
the standard is to assure that a problem with main mine fans is 
corrected promptly and that the proper persons are notified that the 
problem exists. The types of electrical or mechanical deficiencies 
requiring action under paragraph (d) are those that can interfere with 
mine ventilation. In addition, MSHA has 25 years of experience with the 
phrase ``electrical and mechanical deficiencies'' and is, again, 
unaware of any significant difficulties with the use of this 
terminology during this time frame.
    Commenters also addressed the proposal that the ``mine 
superintendent, assistant mine superintendent, or mine foreman'' be 
notified immediately when an unusual variance in mine ventilation 
pressure is observed, or when an electrical or mechanical deficiency in 
a main mine fan is detected. The final rule does not retain the mine 
superintendent or the assistant mine superintendent as mine officials 
to be notified. Commenters stated that this provision provides a 
measure of safety to the miners by requiring that specific mine 
managers be notified of possible main mine fan problems, while the 
existing standard specifies that such a situation must be investigated. 
Other commenters, however, suggested that the persons identified for 
notification under the proposal may not be the most qualified to handle 
the problem. They also indicated that the notification requirement 
could unnecessarily delay appropriate action by other responsible 
persons. The commenters further stated that the mine superintendent or 
assistant mine superintendent may not be at the mine and that a 
certified person would be in charge who should be permitted to take the 
appropriate action. The proposed requirement that certain mine managers 
be notified immediately was not intended to require that these 
individuals personally take the necessary actions to respond to the 
problem with the main mine fan. Neither was it intended that they be 
notified of such a problem, to the exclusion of all others. The 
objective of the rule is to assure that the appropriate actions are 
taken as soon as possible. Additionally, notification of specified mine 
officials is intended to assure that those persons who are responsible 
for the mine are aware of the problem. The 

[[Page 9770]]
final rule, therefore, retains the requirement that certain mine 
managers be notified of any unusual variance in the mine ventilation 
pressure or if an electrical or mechanical deficiency of a main mine 
fan is detected.
    The final rule does, however, delete reference to notification of 
the mine superintendent or assistant mine superintendent. As discussed 
in relation to the countersigning of records, the mine superintendent 
is quite often not a certified person and is only periodically present 
at the mine. In addition, consistent with other sections of the final 
rule and recognizing that the term mine foreman is not used at some 
mines, the final rule requires that if an unusual variance in the mine 
ventilation pressure is observed, or if an electrical or mechanical 
deficiency of a main mine fan is detected, the mine foreman or 
equivalent mine official, or in the absence of the mine foreman or 
equivalent mine official, a designated certified person acting for the 
mine foreman or equivalent mine official shall be notified immediately. 
As with the proposal, the final rule requires that appropriate action 
or repairs shall be instituted promptly. It is not intended that the 
appropriate action or repairs be delayed until the mine foreman or 
equivalent mine official is notified.
    During a series of informational meetings held by MSHA following 
publication of the existing rule, questions arose concerning the 
operation of back-up fans. For informational purposes, the preamble to 
the proposal included a detailed discussion of questions about the 
operation of back-up fans under the ventilation regulations and 
solicited comments. MSHA did not propose any rule changes, nor does the 
final rule contain specific provisions for back-up fans. When a back-up 
fan operates in place of the main mine fan, the back-up fan is 
considered to be a main mine fan and all subpart D requirements for 
main mine fans are applicable.

Section 75.312  Main Mine Fan Examinations and Records

    Proper operation of main mine fans is critical to mine ventilation 
and the prevention of methane accumulations and possibly methane 
explosions. Recognizing the importance of the main mine fan, 
Sec. 75.312 requires that each main mine fan be examined at least once 
each day that the fan operates unless the fan is continuously monitored 
with a main mine fan monitoring system. Through daily examinations or 
continuous monitoring of critical parameters, the operator can 
determine if problems with the fan are developing and correct these 
problems before ventilation is affected.
    The final rule removes existing paragraph (g)(2), revises existing 
paragraphs (a), (b)(1), (c), (d), (g)(1) and (h), redesignates existing 
paragraph (f) as (f)(1), and adds new paragraphs (f)(2) and (g)(2). 
Paragraph (a) of the final rule, like the existing rule, requires daily 
examination of main mine fans unless a fan monitoring system is used. 
In addition, paragraph (a) specifies that an examination of the main 
mine fan is not required on days when no person goes underground. An 
examination of the fan, however, is required prior to anyone entering 
the mine. The purpose of this examination, as stated in paragraph (a), 
is to assure the electrical and mechanical reliability of the fan.
    When a fan monitoring system is used, the final rule requires a 
daily review of the data from the monitoring system to be made, except 
on days when no person goes underground. A review of the data from the 
monitoring system must be completed, however, prior to anyone entering 
the mine.
    Fan examinations or review of fan monitoring system data are 
required to be performed by a trained person designated by the 
operator.
    Commenters questioned the use of the term ``assure'' in paragraph 
(a) when referring to the electrical and mechanical reliability of main 
mine fans. MSHA uses the term ``assure'' in this context as defined in 
Webster's Third New International Dictionary, Unabridged, 1993 edition, 
to mean, ``to make safe, to give confidence to.'' The sense of this 
definition is consistent with the intended purpose of the examination. 
The term does not mean to ``guarantee'' safety, as suggested by one 
commenter.
    Commenters suggested that the final rule require the examination of 
main mine fans for proper operation be conducted by an individual 
trained as part of the mine operator's training plan required by MSHA's 
comprehensive training regulation in part 48 of 30 CFR. Other 
commenters understood the proposal to require training of fan examiners 
under part 48, and objected to such a requirement. These commenters 
suggested that the person conducting the fan examination be one who has 
received training through experience or has been trained by an 
experienced person, or by the fan manufacturer. The final rule does not 
require fan examiners to be trained as part of the operator's part 48 
training plan. Instead, the final rule specifies that fan examiners 
must be trained sufficiently to have the skill and knowledge to 
ascertain whether the fan is in proper working order, mechanically and 
electrically.
    Paragraph (a) requires a daily physical examination of the main 
mine fan, unless a fan monitoring system is used. If a fan monitoring 
system is used, paragraph (b) requires a weekly physical examination of 
the main mine fan, a weekly test of the monitoring system, and a daily 
review of the main mine fan monitoring data. Commenters suggested that 
even if a main mine fan is equipped with a monitoring system, the fan 
should still be subject to daily physical examinations because a fan 
monitoring system is not capable of disclosing all conditions that a 
physical inspection could disclose. The final rule does not adopt this 
suggestion. A weekly physical examination of the fan and a test of the 
monitoring system coupled with a daily review of the monitoring data 
provides reasonable assurance that a mine fan is operating reliably. 
Commenters suggested that the proposed requirement of paragraph (b)(1) 
requiring a daily review of main mine fan monitoring system data is 
unnecessary and redundant. These commenters suggested that the system 
need only be capable of producing a printout because the systems would 
automatically alarm anytime an electrical or mechanical deficiency 
exists. Requiring a daily review of the monitoring system data, 
according to these commenters, could discourage the use of improved 
technology. Other commenters noted that operators currently using fan 
monitoring systems conduct a daily review of the data at the present 
time and that the requirements to review the data would provide an 
additional measure of safety for the miners. MSHA believes that a daily 
review of data from fan monitoring systems is needed to assure that 
mine management is made aware of any operational changes or trends in 
monitored parameters. Main mine fans provide the source for mine 
ventilation and, therefore, are critical to miners' safety. As 
discussed earlier, these daily reviews of data are designed to 
complement the physical examinations of the fan.
    The final rule adopts the requirements of proposed paragraphs 
(b)(1)(ii) (A) and (B) and requires that when a fan monitoring system 
is used as provided under paragraph (a), a trained person designated by 
the operator must test the system for proper operation at least every 7 
days. Commenters objected that it is redundant because a fan monitoring 
system is capable of monitoring itself and can automatically provide a 
warning when a fan malfunction occurs. These commenters also stated 
that if the 

[[Page 9771]]
system is continuously operated, the system is self-tested for proper 
operation several times a minute and that the 7-day test is 
unnecessary. The commenters suggested that the 7-day test only be 
conducted if the fan monitoring system is not continuously operated. 
For continuously operating fans an examination of the fan should more 
appropriately be conducted monthly, according to these commenters. 
Requiring more frequent checks the commenters maintain would discourage 
the use of fan monitoring systems.
    The final rule does not adopt these suggestions. While MSHA 
encourages the use of fan monitoring systems, excessive reliance on the 
self-monitoring features of these systems is incompatible with the 
importance of reliable operation of main mine fans. MSHA does not 
anticipate that the final rules for examination requirements will 
discourage the use of fan monitoring systems. Main mine fans without a 
monitoring system are required to be examined daily, while fans with 
monitoring systems are required to be examined every seven days.
    Paragraphs (c) and (d) of Sec. 75.312 of the final rule continue in 
effect the requirements that tests of the automatic fan signal device 
and automatic closing doors, when these doors are required, be 
conducted at intervals not to exceed 31 days. The specified means of 
testing these devices and doors is by stopping the fan. The proposal 
would have permitted an alternative test not involving stopping the fan 
if the alternative method provided the same level of assurance that the 
signal device or door would function as intended during fan stoppages. 
Two commenters favored the proposal and suggested that there is no need 
to approve alternate means of testing fan signal devices in the mine 
ventilation plan. These commenters expressed the opinion that each 
authorized representative should be capable of ascertaining the 
validity of the alternative method. The commenters did not make a 
similar suggestion relative to the alternative means provision proposed 
in paragraph (d) for automatic closing doors. Another commenter opposed 
the use of alternative tests stating that it would be premature to 
adopt a provision for an alternative test to stopping the fan when such 
a test has not as yet been developed. MSHA has reconsidered the 
proposal and the final rule continues to require that the tests of fan 
signal devices and automatic closing doors be conducted by stopping the 
fan. Should an operator develop an alternative method that provides the 
same level of protection as stopping the fan, the petition for 
modification process is available for an operator to obtain approval.
    Paragraphs (c) and (d) permit underground power to remain energized 
during fan signal and automatic closing door testing, notwithstanding 
the requirements of Sec. 75.311. If the fan is not restarted within 15 
minutes, the final rule requires that underground power be deenergized 
and no one is permitted to enter any underground portion of the mine 
until the fan is restarted and an examination is conducted. 
Additionally, paragraphs (c) and (d) require that only persons 
necessary to evaluate the effect of the fan stoppage or restart, or to 
perform maintenance or repair work that cannot otherwise be done while 
the fan is operating, are permitted underground.
    Some commenters objected to limiting the persons who can be 
underground during fan signal and closing door tests. Other commenters 
objected to anyone being permitted underground during the stoppage of a 
fan to conduct the required tests. These commenters expressed the 
opinion that all necessary work can be performed with the fan operating 
and therefore, when a fan is shut down to test the fan signal device or 
the automatic closing doors no one should be underground.
    Some work, such as working immediately inby a blowing fan, could 
place workers at risk by exposing them to extreme temperatures, effects 
of the high velocity air stream, or excessive noise levels when the fan 
is operating. In addition, repair work within a shaft can more safely 
be done when a fan is stopped. The rule, therefore, retains the 
exception that permits persons underground during intentional fan 
stoppages to evaluate the effect of the fan stoppage or restart, or to 
perform maintenance or repair work that cannot otherwise be done while 
the fan is operating.
    Paragraphs (c) and (d) of the final rule are reworded to clarify 
that during the required tests, power circuits may remain energized 
only if no person is underground. Therefore, if an operator elects to 
evaluate the effect of the fan stoppage or restart, or to perform 
maintenance or repair work that cannot otherwise be done while the fan 
is operating, simultaneous with the tests required, power circuits must 
be deenergized in accordance with Sec. 75.311(b)(3). Additionally, in 
accordance with Sec. 75.311(b)(2), all mechanized equipment must be 
shut off.
    Paragraph (f)(1) of the final rule retains the longstanding 
requirement that the person performing main mine fan examinations 
certify by initials and date at the fan or another location specified 
by the operator that the examinations were made. Each certification is 
required to identify the main mine fan that was examined. When daily 
fan examinations are conducted, daily certification is required. When a 
main mine fan monitoring system is used and fan examinations are 
conducted at 7 day intervals, certification is required each time the 
fan is examined.
    One commenter offered suggested wording that would eliminate the 
option of certifying that the examination was completed at a location 
other than the fan being examined. This suggestion has not been adopted 
and the final rule retains the flexibility for certifications to be 
made away from the fan.
    Paragraph (f)(2) of the final rule requires that when a main mine 
fan monitoring system is used, a daily printout of the system's data 
must be certified to indicate that the daily review was completed. 
While some commenters generally agreed with this requirement other 
commenters suggested that an alternative should be provided for systems 
which are continuously operated and supervised. In such cases, the 
commenters suggested that immediate notification of the mine foreman 
when a deficiency arises would be appropriate, together with 
maintaining the internal records of data gathered by the systems for 
one year.
    The suggested alternative is not included in the final rule. MSHA 
believes that documentation that monitoring system data is being 
reviewed is necessary to provide reasonable assurance that mine 
management is aware, on a timely basis, of the operating condition of 
the fan being monitored. However, to reduce the burden of this 
requirement, the final rule in paragraph (f)(2) does permit the 
electronic certification of the review of the data generated by a fan 
monitoring system. As with electronically kept records, the rule would 
require that the electronic certification include handwritten initials 
and dates. A discussion of comments concerning the use of computers to 
maintain records can be found in the General Discussion of this 
preamble.
    Paragraph (g)(1) of Sec. 75.312 requires that by the end of the 
shift on which the examination is made, persons making main mine fan 
examinations must record all uncorrected defects found during the 
examination that may affect the operation of the fan. The rule also 
specifies that records be maintained in a book that is secure and not 
susceptible 

[[Page 9772]]
to alteration, or electronically in such a manner as to be secure and 
not susceptible to alteration. The proposal would have required all 
defects found during the main mine fan examination that may affect the 
operation of the fan to be recorded whether corrected or uncorrected.
    Some commenters objected to recording defects that ``may'' affect 
the operation of the main mine fan, and suggested only defects that do 
affect the operation of the main mine fan and that are not corrected by 
the end of the shift, need to be recorded.
    Some commenters asserted that a record of ``all'' defects should be 
required in order to identify recurring problems that may lead to 
bigger problems. These commenters interpreted the proposal to require 
such a record. The final rule is intended to address problems found 
during fan examinations that may indicate more serious defects and 
ultimately lead to a fan failure and that cannot be corrected by the 
end of the shift. The objective is to record defects of a nature and 
seriousness that could result in a fan failure, but not to record 
defects that are so minor that it would be unreasonable to expect fan 
failure to result. Another commenter stated that recording all defects 
that may affect fan operation would result in excessive paperwork of 
little value. This commenter also suggested that if mine ventilation 
does become ineffective, the workers are to be withdrawn from the mine. 
MSHA is sensitive to concerns about recordkeeping. Therefore, the final 
rule requires that all uncorrected defects which are found during the 
examination that may affect fan operation be recorded. In this manner, 
miners on the oncoming shift are aware of problems with the fan that 
potentially could impact underground ventilation.
    Commenters supported the use of electronic media as a substitute 
for specific types of record books. Commenters pointed out that almost 
all such systems incorporate recordkeeping functions and that 
significant variances from the norm are easily noted. They concluded 
that the computer monitoring systems provide superior protection for 
the miners. The final rule permits, in paragraph (g)(1), the use of 
electronically stored records for main mine fan examinations provided 
the records are secure, are able to capture the information and 
signatures required, and are accessible to the representative of the 
miners and the representatives of the Secretary.
    As with other records required by this rule, paragraphs (g)(2) and 
(g)(3) require that records required by Sec. 75.312 must be made in 
books that are secure and not susceptible to alteration, or 
electronically in such a manner as to be secure and not susceptible to 
alteration. A detailed discussion of record books and the use of 
computers to maintain records can be found in the General Discussion of 
this preamble.
    Paragraph (g)(2) of the existing rule requires that at mines 
permitted to shut down main mine fans under Sec. 75.311, if a pressure 
recording device is not used, a record shall be made, in a book 
maintained for that purpose, of the time and fan pressure immediately 
before the fan is stopped, and after the fan is restarted and the fan 
pressure stabilizes. The final rule does not retain this requirement in 
light of the new requirement of Sec. 75.310(a)(4) that all main mine 
fans be provided with a pressure recording device or an option of the 
use of a fan monitoring system. This new requirement eliminates the 
need for an additional record of the time and fan pressure made 
immediately before the fan is stopped and after the fan is restarted 
and the fan pressure stabilizes. This information is obtained from the 
pressure recording chart, which records the pressure continuously and 
automatically, thus maintaining the protection afforded the miners.
    Paragraph (h) of the final rule requires that the records required 
by Sec. 75.312 be maintained at a surface location at the mine for one 
year and be made available for inspection by authorized representatives 
of the Secretary and the representative of miners. Comments were 
generally favorable on this proposal. A discussion of comments 
concerning the use of computers to maintain records can be found in the 
General Discussion of this preamble.
    As with the other provisions of the final rule allowing electronic 
certification or recordkeeping, sufficient protections have been 
included so that there is no reduction in protection from the existing 
standards.

Section 75.313  Main Mine Fan Stoppage With Persons Underground

    Section 75.313 was stayed by MSHA as explained in the introductory 
section of this preamble. Generally, this standard is concerned with 
protecting miners from the danger introduced when the main mine fan 
stops, such as when there is a loss of power. Under these 
circumstances, mine ventilation is interrupted, permitting gases such 
as methane to accumulate. These conditions can lead to an explosion 
ignited by electric circuits or the operation of equipment.
    Paragraph (a)(3) of the final rule requires that if a main mine fan 
stops, everyone shall be withdrawn from the working sections and from 
areas where mechanized mining equipment is being installed or removed. 
The language of the final rule is identical to the wording of stayed 
Sec. 75.313 (a)(3). An in-depth discussion of provisions concerning the 
installation and removal of mechanized mining equipment is presented in 
the General Discussion section of this preamble.
    The final rule revises paragraphs (c)(2), (c)(3), (d)(1)(i) and, 
(d)(1)(ii) of the stayed standard. Paragraphs (c)(2) and (c)(3) require 
that when a main mine fan stops with persons underground, the 
underground electric power circuits shall be deenergized and mechanized 
equipment shall be shut off. These rules further recognize an exception 
to facilitate miners' evacuation from the mine. The exception 
temporarily permits some circuits to remain energized and some 
mechanized equipment to not be shut off, provided these circuits and 
mechanized equipment are necessary to withdraw persons from the mine 
and are located in areas where methane is not likely to migrate to or 
accumulate. These circuits must be deenergized and the mechanized 
equipment must be shut off as persons are withdrawn. The final rule 
differs from the stayed standard by limiting the exception permitting 
the use of these circuits or equipment to areas where methane is not 
likely to migrate to or accumulate.
    Paragraph (d)(1)(i) requires that when a fan stoppage lasts for 
more than 15 minutes a preshift-type examination must be conducted 
before persons other than designated examiners, are permitted to enter 
any underground area of the mine. Examiners are permitted to re-enter 
the underground area of the mine from which miners have been withdrawn 
only after the fan has operated for at least 15 minutes unless a longer 
period of time is specified in the mine ventilation plan. Paragraph 
(d)(1)(ii) requires that when a fan stoppage lasts for more than 15 
minutes, underground power circuits are not to be energized and 
nonpermissible mechanized equipment is not to be started until a 
preshift-type examination is conducted, except that designated 
certified examiners may use nonpermissible transportation equipment in 
intake airways to facilitate the conduct of the required examination.
    Some commenters suggested that actions following fan stoppages are 
best handled on a mine-by-mine basis through a plan approval process. 
Along 

[[Page 9773]]
these lines, commenters suggested that the fan stoppage plan approval 
process previously used by MSHA should be used with only minor 
modification to assure that plans do not become standardized, that is, 
model the rule on a past standard with criteria for approval of fan 
stoppage plans. Other commenters, while supporting the concept of fan 
stoppage plans, proposed to tie the submission and approval of such 
plans to total mine ventilation surveys and computer simulations 
conducted by the operator every three months. According to one 
commenter the data provided by these surveys would be used to determine 
the adequacy of a fan stoppage plan.
    The final rule does not adopt the suggestions of the commenters for 
mine fan stoppage plans. One objective in this rulemaking is to reduce 
the need for paperwork, such as plans, where reasonable, uniform 
requirements can be developed. The final rule establishes the general 
requirement that after a fan stoppage lasting more than 15 minutes, 
mine power and equipment is to be shut down. However, experience shows 
that using transportation equipment to facilitate mine evacuation is 
often necessary, provided this is done where gas is not likely to 
accumulate, and circuits are deenergized on the way out of the mine.
    Some commenters suggested that the requirements in paragraphs 
(c)(2) and (c)(3) limiting the use of transportation equipment to areas 
and haulageways ``where methane is not likely to migrate to or 
accumulate'' are inconsistent with certain state laws. As support for 
this assertion, the commenters gave the example of the state of 
Illinois' requirements for evacuating mines following an interruption 
in ventilation, which does not expressly recognize limited use of power 
and equipment to facilitate evacuation. State mine safety laws, 
including Illinois', are similar to the final rule provisions for 
evacuation after a mine fan stoppage. As a general rule, state mine 
safety regulations that are more stringent than MSHA standards are not 
considered to be in conflict with federal regulations, and the more 
stringent safety requirement applies. In this case, if the Illinois 
regulation would not permit temporary use of power and equipment to 
facilitate evacuation, then the state law would not be inconsistent 
with MSHA.
    Several commenters objected to the wording, ``where methane is not 
likely to migrate to or accumulate,'' in paragraphs (c)(2) and (c)(3), 
as being vague. Other commenters stated that the rule's requirement was 
simply good practice that would be heeded by prudent mine managers. 
MSHA agrees that the terms and objectives of the final rule are 
understood in the mining community, and believes that the determination 
of whether methane may migrate from adjacent areas and enter travelways 
and haulageways used by miners during withdrawal should be made on a 
mine-by-mine basis. Therefore, the final rule retains the exception 
that power circuits may remain energized and mechanized equipment may 
be operated only if located in areas where methane is not likely to 
migrate to or accumulate.
    Some commenters stated that history does not support the need for 
the requirements of paragraphs (c)(2) and (c)(3). Mine fan stoppages 
unquestionably result in the existence of unventilated areas and may 
result in highly hazardous methane accumulations. Although there have 
been a limited number of ignitions/explosions directly attributable to 
the operation of transportation equipment during a fan stoppage, the 
true measure of the potential hazard addressed by this standard can be 
seen in the ignitions and explosions that were the result of the 
operation of transportation equipment in unventilated areas. Examples 
of such types of accidents include: The 1972 Itmann No. 3 explosion, in 
which 5 miners died; the 1976 Scotia Mine explosion, in which 15 miners 
died; the 1982 Virginia Pocahontas No. 6 Mine explosion in which 1 
miner was injured; the 1983 McClure No. 1 Mine explosion, in which 7 
miners died; the 1983 Homer City Mine explosion in which a mine 
examiner was killed; the 1983 Greenwich Collieries No. 1 Mine explosion 
in which 3 miners were killed and 4 miners were injured and; the 1993 
explosion at the Buck Mountain No. 2 Mine in which 3 miners were 
injured. Given this history of explosions, it would not be prudent to 
permit electric circuits to remain energized and mechanized equipment 
to be operated in areas or haulageways where methane is likely to 
migrate to or accumulate during a fan stoppage.
    One commenter stated that the in-mine test necessary to determine 
the likelihood of methane migration could only be done with the fan 
stopped. The commenter questioned whether miners would be permitted 
underground during the tests. To the extent the tests require the main 
mine fan to be turned off, persons would be allowed underground to 
evaluate the effect of the fan stoppage or restart.
    Paragraphs (d)(1)(i) and (ii) address safety precautions for 
reentering the mine after ventilation is restored. Key objectives of 
these standards are the protection of the examiners and the safety of 
miners returning to work.
    As proposed, paragraph (d)(1)(i) would have required that when a 
fan stoppage lasts for more than 15 minutes a preshift- type 
examination be conducted covering the requirements of Sec. 75.360(b) 
through (e) before persons, other than designated examiners, enter any 
underground area of the mine. Commenters suggested that to provide the 
level of protection desired, a complete preshift examination, including 
the certification and recordkeeping requirements of Sec. 75.360(f) 
through (g), should be required. Commenters pointed to the need for 
miners reentering evacuated areas to be able to determine if the area 
had been examined and urged that the final rule require the examiner to 
certify by initial, date and time the areas exa
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
mined.
    MSHA agrees that clear notice to miners about which areas have been 
examined is necessary and consistent with the objectives of the rule. 
The final rule, therefore, adopts the proposal. A record of the 
hazardous conditions found by examiners is required under Sec. 75.363 
of the final rule. This record serves the purpose of providing mine 
management with the information necessary relative to the existence and 
correction of hazardous conditions in the mine. The final rule 
incorporates these requirements by specifying that the scope of the 
examination be conducted as described in Sec. 75.360(b) through (e).
    Under paragraph (d)(1)(i) no one other than designated certified 
examiners would re-enter any underground area of the mine until the 
entire examination is completed. Commenters suggested that paragraph 
(d)(1)(i) be revised to permit partial examinations following fan 
stoppages and restarts under certain conditions. Under this suggested 
approach, the examination would focus on the effectiveness of the 
mine's ventilation system and methane accumulations in travelways, work 
places or other areas where miners will work following the interruption 
of ventilation. One commenter further suggested that an exception to 
this examination be provided for noncoal producing shifts, where 
persons are to work in the shaft, slope, drift, or on the immediate 
shaft or slope bottom area. The commenter suggested the examination 
following a fan stoppage could be limited to this area.
    The final rule does not adopt this approach. Limiting the scope of 
examinations following an interruption in mine ventilation to general 

[[Page 9774]]
ventilation effectiveness and methane accumulation would not focus on 
likely areas of concern. For example, no examination for hazards would 
be required, and no air measurements to determine if the air is moving 
in its proper direction and at its normal volume would be required. As 
to the area of the mine required to be examined, only those places 
where miners will return to work and the route of travel used to reach 
these places must be examined. Thus, the final rule is sufficiently 
flexible to meet the commenter's concerns about non- coal producing 
shifts.
    A question arose during public meetings as to the meaning of the 
term on-coming shift in Sec. 75.360 when applied to Sec. 75.313. For 
the purposes of Sec. 75.313(d)(1)(i) and (ii) the term ``persons on the 
on-coming shift'' is interpreted as meaning persons on the shift on 
which the fan is restarted. If a fan outage extends from one shift into 
another, a preshift examination as required by Sec. 75.360 must be 
completed before any person, except certified examiners designated to 
conduct the examination, enters the mine.
    Commenters also suggested that the final rule specify a minimum 
time for the fan to run before examiners re-enter the mine so that 
examiners are not unduly exposed to danger. Several commenters observed 
that this is a general practice in the industry.
    MSHA agrees that an important measure of safety is gained by 
allowing the mine fan to run sufficiently long to begin reventilating 
the mine before anyone enters. The final rule, therefore, provides 
designated certified examiners shall enter the underground area of the 
mine from which miners have been withdrawn only after the fan has 
operated for at least 15 minutes unless a longer period of time is 
specified in the approved mine ventilation plan. The 15 minute 
provision will permit re- ventilation of entries in which examiners 
will travel to take place and the examiners will then be traveling into 
the mine in fresh air.
    Proposed paragraph (d)(1)(ii) would have required that when a fan 
stoppage lasts more than 15 minutes underground power circuits are not 
to be energized and nonpermissible equipment is not to be started until 
a preshift-type examination is completed. Commenters objected to the 
proposal for various reasons. One commenter suggested that before power 
is permitted to be energized a complete ventilation survey should be 
required. Other commenters focused on the practical considerations 
involved in conducting examinations and urged that use of 
nonpermissible equipment for the transportation of examiners be 
permitted.
    As revised, paragraph (d)(1)(i) requires that the main fan when 
restarted run for at least 15 minutes so that restoration of mine 
ventilation is underway before anyone enters the mine. Once this is 
accomplished, electrical circuits in shafts and slopes can be energized 
safely as these areas are the first places to be reventilated by fresh 
air. Accordingly, the final rule permits these circuits to be re-
energized after the mine fan has run for at least 15 minutes.
    The final rule also permits examiners to use nonpermissible 
equipment for transportation during the examination. The proposal would 
have prohibited this practice. Some commenters supported the proposed 
prohibition citing two mining accidents involving nonpermissible 
equipment in unventilated areas. Other commenters objected to the 
proposal not to allow the use of nonpermissible equipment to facilitate 
examinations following the restart of a main mine fan. These commenters 
stated that travelways and equipment roadways can be examined and 
tested for the presence of methane, the results of the examination 
called out, and typical nonpermissible transportation equipment placed 
into operation to expedite the examination of the mine.
    After considering all of the comments, MSHA has revised the 
proposal and the final rule permits the use of nonpermissible 
transportation equipment, in intake airways, to facilitate making the 
examinations after an interruption in mine ventilation. Using 
nonpermissible equipment in this fashion, in nonventilated areas, has 
been a demonstrably safe practice for many years in the industry. In 
addition, the requirement of running the fan for 15 minutes before 
reentering the mine, together with keeping the transportation equipment 
in the intake airways where the main ventilating current travels first, 
provides the desired level of safety.
    Under proposed paragraph (d)(2), if ventilation was restored to the 
mine before miners reached the surface, all miners would have been 
required to continue traveling to the surface. As proposed, designated 
certified examiners would have been permitted to remain underground for 
the purpose of beginning the required examination. The final rule does 
not adopt the proposal and retains the language of the existing 
standard.
    While supporting the requirement that miners continue to the 
surface after a fan is restarted, some commenters objected to 
permitting certified persons to remain underground. These commenters 
also took the position that once a fan has been off for more than 15 
minutes, all efforts to restart the fan should be suspended, unless it 
is known that it is safe to restart the fan. Other commenters expressed 
significantly different views on both issues. A number of commenters 
supported restarting the fan as soon as possible because the longer it 
is off, the greater the potential hazard. MSHA concurs with this 
reasoning and the final rule adopts this approach.
    On the issue of requiring the evacuation to continue once it has 
begun until the fan is restarted, even when ventilation is restored, a 
number of commenters objected that such a requirement would result in 
unnecessary delays and may result in additional safety risks. One 
commenter stated that the proposal would not allow for the variables 
that exist from mine to mine. Several commenters suggested that if the 
operator has reason to believe that the time frame of the fan stoppage 
would be less than the travel time or equivalent, the dangers of 
traveling outby into possible pockets of dangerous gas buildup (or 
other travel hazards) far outweigh the dangers of staying on the 
section in intake air back from the face. This would also allow the 
miners to remain on the section and proceed to the working places after 
the fan has restarted and the working places have been examined by a 
certified person.
    MSHA disagrees with this position. In some mines, the time to 
travel from the outside to the working sections can approach 1 hour. 
Following the approach suggested, miners would remain on the section in 
an unventilated mine for up to 1 hour. If at the end of this time 
ventilation is still not restored, it is unclear whether the miners 
then proceed to the surface, traveling through the same area the 
commenter suggested might be hazardous some 45 minutes before.
    The commenters stated further that, ``Forcing miners to walk out of 
the mine could take hours and unnecessarily delay the restoration of 
ventilation and resumption of operations.'' While there may be 
instances where the time required to withdraw miners is increased, the 
requirements in paragraphs (c)(2) and (c)(3) have no impact on the 
restoration of ventilation. In fact, MSHA's position is that 
ventilation should be restored as soon as possible following a fan 
stoppage.
    Lastly, a number of commenters suggested that when ventilation is 
restored during evacuation, miners should be permitted to remain where 

[[Page 9775]]
they are and return to working areas after an examination of inby areas 
is completed. These commenters stated that no additional measure of 
safety is gained by requiring miners to continue to the surface if 
ventilation has been restored and the area in which the miners are 
located is free of hazards. MSHA agrees and has retained the language 
of the existing rule. By retaining the existing language, the general 
practice of miners stopping their evacuation and waiting for examiners 
to complete their work will continue. Under this approach, miners 
remain in a safe location while ventilation of the mine is restored. 
They do not return to any area of the mine until it has been determined 
to be safe. The final rule does not prevent mine operators from having 
miners continue to the surface if they so choose. Regardless of whether 
miners remain where they are or continue to the surface, paragraph 
(d)(1)(i) of the final rule requires that the fan operate for at least 
15 minutes before the examination of the areas from which miners have 
withdrawn is examined.

Section 75.320  Air Quality Detectors and Measurement Devices

    Section 75.320 establishes the standards for the devices relied 
upon to test for the presence of methane and other dangerous gases that 
can accumulate in a mine. It generally requires that these devices be 
approved and maintained in permissible and proper operating condition.
    The final rule adds a new paragraph (e). It requires that 
maintenance of instruments required by paragraphs (a) through (d) of 
Sec. 75.320 to detect and measure air quality be done by a trained 
person. The final rule does not include the proposal that before each 
shift care shall be taken to assure the permissible condition of the 
air quality detectors and other measurement devices to be used during 
the shift. MSHA has concluded that this requirement would have been 
redundant with paragraph (a) and is unnecessary. The final rule permits 
an operator to send instruments to a repair facility or to the 
manufacturer for regular servicing. Commenters at the informational 
meetings and in later discussions on the existing rule stated that 
maintenance by trained persons should be specified and that requiring 
only that air quality detectors and other measurement devices be 
maintained in permissible condition would not be sufficient. They 
stated that without a requirement for maintenance to be done by a 
trained person, similar to that which existed in the previous standard, 
a person with less than the necessary understanding of the instrument 
and the permissibility requirements might be assigned the task.
    Several commenters suggested that the requirements of paragraph (e) 
are redundant with general requirements found elsewhere in the 
standards and are unnecessary. Other commenters felt that the current 
performance standard is adequate, but that the meaning of ``assure'' is 
unclear. Still other commenters indicated that the assurance of 
permissibility is properly the responsibility of the user. One 
commenter noted that the instruments are intrinsically safe and that 
the manufacturer's instructions are sufficient. MSHA agrees that the 
general requirement under paragraph (a), together with requiring 
trained persons, is adequate.
    Another commenter suggested that a formal written maintenance 
program be required. Under this suggestion, the program would be 
subject to MSHA approval and would include records of all maintenance 
and calibrations to be made by the end of the shift. This commenter 
also suggested that existing paragraph (a) be revised to provide for 
more frequent calibration by inserting the phrase ``* * * or more often 
if necessary * * *.'' This suggestion has not been adopted since 
compliance with the proper operating and permissibility provisions of 
paragraph (a) would result in more frequent calibration, if necessary. 
MSHA notes that under the previous standard, there was no written 
maintenance program required nor were records required. MSHA believes 
that experience under both the previous and existing standards 
demonstrates that, with the addition of paragraph (e), maintenance and 
calibration is appropriately addressed in the final rule and safety is 
not reduced.
    Several commenters agreed with the proposal for a ``trained'' 
person to maintain air quality detectors and measurement devices. These 
commenters suggested that the trained person be defined as a person 
designated by the operator who has received training through experience 
in maintenance of the instrument, has been trained by an experienced 
person, or one who has received training by or through the instrument 
manufacturer. MSHA has not adopted this suggestion since the operator 
should have some flexibility as to the mode of training. The 
requirement that the person performing the maintenance must be trained 
is intended to mean that the person be capable of doing the required 
maintenance, not that they receive a specific course of instruction in 
what to do.
    Commenters suggested that maintenance and calibration requirements 
should parallel those proposed under Sec. 75.342 for machine-mounted 
methane monitors. They suggested that, because the detectors and 
monitors perform similar functions, the requirements should be similar. 
The final rule does not adopt this suggestion. The methane monitoring 
instruments under this standard and those governed by Sec. 75.342 are 
subject to different mining conditions. For example, machine-mounted 
monitors must be calibrated and maintained underground, on the 
equipment on which they are installed and on working sections. This 
calibration must also be scheduled within production timetables. 
Handheld detectors and measurement devices, however, are removed from 
the mine and are maintained and calibrated in surface environments. 
Calibration and maintenance of handheld detectors is usually done 
during shifts when the instruments are rotated out of service. Thus 
machine-mounted monitors are calibrated and maintained under more 
strenuous conditions than handheld detectors.
    One commenter suggested that written records of all maintenance and 
calibration should be required. The commenter further suggested that: 
Each operator submit a written maintenance program to MSHA for approval 
and provide a copy to the miner's representative; the written program 
specify training to be provided; records be completed by the person 
performing maintenance and be countersigned by the mine foreman within 
24 hours; and that records be maintained for one year and be made 
available to MSHA and the representative of the miners. These 
additional requirements were not included in the proposal and are not 
adopted in the final rule. The requirements contained in the final rule 
adequately address and are appropriately related to the concerns 
relative to maintenance, calibration, permissibility, and the general 
condition of air quality detectors and measurement devices.

Section 75.321  Air Quality

    The primary function of a mine ventilation system is twofold, to 
remove hazardous gases such as methane, and to provide miners with an 
respirable environment in areas where they are required to work or 
travel. As discussed in the introductory section of this preamble, 
Sec. 75.321 of the existing standard was stayed by the United States 
Court of Appeals for the District of Columbia Circuit as it pertains to 
bleeder entries. The final rule, in 

[[Page 9776]]
Sec. 75.321, addresses acceptable levels of oxygen and carbon dioxide 
in areas of a mine, including areas of a bleeder entry, where persons 
are required to work or travel.
    Paragraph (a)(1) continues a basic air quality requirement that has 
been in place since 1970 that air in areas where persons work or travel 
contain at least 19.5 percent oxygen and not more than 0.5 percent 
carbon dioxide, and the volume and velocity of the air current in these 
areas be sufficient to dilute, render harmless, and carry away 
flammable, explosive, noxious, and harmful gases, dusts, smoke, and 
fumes. Paragraph (a)(2) applies the same requirement for oxygen, 19.5 
percent, for the air in areas of bleeder entries and worked-out areas 
where persons work or travel. The final rule does not require the 
carbon dioxide level of 0.5 percent to be applied to bleeder entries 
and worked-out areas. Rather paragraph (a)(2) requires that the carbon 
dioxide levels in the air in bleeder entries and worked-out areas where 
persons work or travel not exceed 0.5 percent time-weighted average 
(TWA) and 3.0 percent short-term exposure limit (STEL).
    MSHA interpreted former Sec. 75.301 to require at least 19.5 
percent oxygen and no greater than 0.5 percent carbon dioxide in 
bleeder systems where persons work or travel. It was MSHA's intent that 
existing Sec. 75.321 would necessitate compliance with these levels 
where persons would be exposed in bleeder entries and in worked-out 
areas. However, the application of this provision to bleeders and 
worked-out areas was stayed by the United States Court of Appeals 
pending the outcome of litigation addressing the promulgation of the 
existing rule. MSHA continues to believe that providing necessary air 
quality is essential to protect miners and examiners whenever they work 
or travel in bleeder entries and worked-out areas. Therefore, the final 
rule includes a new provision specifying that the air in bleeder 
entries and worked-out areas where persons work or travel contain at 
least 19.5 percent oxygen, and that carbon dioxide not exceed 0.5 
percent TWA and 3.0 percent STEL. A TWA is the time-weighted average 
concentration for a normal 8-hour workday and a 40-hour workweek. A 
STEL is the maximum time-weighted average concentration to which miners 
can be exposed for a continuous period of up to 15 minutes. Commenters 
noted an error in the preamble to the proposal with respect to the time 
an individual can be exposed to concentrations between the TWA and the 
STEL. MSHA intends to apply TWA and STEL levels in a manner consistent 
with the Air Quality rulemaking. The levels for carbon dioxide in the 
final rule for areas where persons work or travel in bleeder entries 
and worked-out areas are identical to the levels contained in MSHA's 
proposed Air Quality standards for coal and metal and nonmetal mines 
and the 1992 Threshold Limit Values (TLVs) as specified by the American 
Conference of Governmental Industrial Hygienists (ACGIH).
    Some commenters suggested that other changes be included in the 
final rule. First, they recommended that the permissible minimum oxygen 
level for bleeders and worked-out areas be lowered from 19.5 percent to 
18 percent. Second, they suggested that the requirements that apply to 
bleeders and worked-out areas be expanded to include airways associated 
with bleederless mining areas. The rationale given for this second 
recommendation was that the conditions in these airways are similar to 
bleeders. In light of the ongoing Air Quality rulemaking, MSHA is not 
at this time clarifying existing Air Quality standards except those for 
worked-out areas and bleeder entries.
    Commenters for the most part agreed with the change relative to 
carbon dioxide although one commenter indicated that there was no need 
for any standard. Bleeder entries and worked-out areas are required to 
be traveled or evaluated at least weekly. Generally, this is done by a 
person traveling alone who is often required to be in the bleeder 
entries or worked-out areas for an extended period. The purpose of this 
standard is to protect miners, not to regulate air quality where 
persons are not exposed. Therefore, if examinations are performed 
remotely or if persons making the examination can otherwise remain in 
air that meets the requirements of the standard, oxygen and carbon 
dioxide levels at bleeder connectors and bleeder evaluation points 
would not have to meet the concentrations required by the final rule.
    According to the National Institute for Occupational Safety and 
Health (NIOSH) of the U.S. Department of Health and Human Services 
(NIOSH Respirator Decision Logic, May 1987), 19.5 percent oxygen 
provides an adequate amount of oxygen for most work assignments and 
incorporates a safety factor. Also according to NIOSH, the safety 
factor is needed because oxygen-deficient atmospheres offer little 
warning of danger. In the NIOSH publication, ``A Guide to Safety in 
Confined Spaces,'' (page 4), a chart is presented that indicates that 
19.5 percent oxygen is the minimum level for safe entry into an area, 
and that at a level of 16 percent, judgement and breathing are 
impaired. The American National Standards Institute (ANSI), in ANSI 
Z88.2-1992, ``American National Standard for Respiratory Protection'' 
recognizes that at 16 percent oxygen there is an impairment in the 
ability to think and pay attention, and a reduction in coordination. 
ANSI recognizes that at 19 percent oxygen there are some adverse 
physiological effects.
    The need for regulating the oxygen level where persons work or 
travel in bleeder entries is illustrated by two mining accidents. One 
of these accidents resulted in the death of a mine examiner and the 
second resulted in the near death of two individuals, one of whom was a 
mine examiner. Mine examiners are, through training and experience, the 
individuals best able to identify the hazards associated with 
irrespirable atmospheres. The first accident occurred at the Arclar 
Mine in Equality, Illinois in 1989. Prior to implementation of the 
existing standard, a mine examiner entered a worked-out area that was 
posted with a danger sign and was asphyxiated. Under the existing 
regulation, ventilation or sealing of this area, rather than posting, 
would be required. Because the area was not sealed, the existing 
regulation would require the area to be examined during the weekly 
examination. The final rule would require that the route of travel for 
the examiner contain at least 19.5 percent oxygen. Had the final rule 
been in place when the examiner entered the worked-out area, the 
accident may have been avoided.
    The second accident, although not in a bleeder entry or worked-out 
area, is illustrative of what can happen when individuals, including 
mine examiners, are subjected to oxygen deficient air. In 1983 at the 
Bird No. 3 Mine in Riverside, Pennsylvania, an assistant mine foreman, 
a certified person, entered the mine for the purpose of conducting an 
examination. After traveling approximately 1100 feet, the examiner 
became dizzy, noticed that his flame safety lamp had extinguished and 
withdrew approximately 200 feet where he sat down and apparently became 
unconscious. A second individual upon entering the area in search of 
the examiner also became dizzy but was able to withdraw to a location 
that was not oxygen deficient. When the mine examiner regained 
consciousness, his cap lamp battery had discharged and he traveled in 
total darkness until he encountered a mine rescue team. Air samples 
collected in the area where the mine examiner first became dizzy 

[[Page 9777]]
indicated an oxygen level of about 16.8 percent, while other samples 
collected nearby indicated oxygen concentrations of nearly 20 percent.
    Because mine examiners are required to work or travel in areas 
where oxygen-deficient air could occur without warning, and they 
normally travel and work alone, there must be a requirement that 
provides them the protection necessary for the performance of their 
duties under these conditions. It is important that the level for 
oxygen be established above that identified as resulting in impaired 
judgement because it is essential that individuals traveling in these 
areas remain highly alert. The hazards that can exist in bleeder 
entries and worked-out areas include elevated methane levels, poor 
footing, loose and unstable roof, and water accumulations. For this 
reason, the final rule adopts a minimum level of oxygen of 19.5 percent 
as recommended by NIOSH.
    MSHA is also concerned with the effects of other gases often found 
in bleeder entries. Section 75.322 of the existing regulation limits 
the concentration of noxious or poisonous gases to the current (1971) 
TLV's as adopted and applied by the ACGIH. Section 75.322 specifically 
excludes carbon dioxide since it is covered by Sec. 75.321. However, so 
the mining public will clearly understand the application of the 
regulation, the final rule establishes a separate standard for carbon 
dioxide levels for areas where persons work or travel in bleeder 
entries and worked-out areas. The levels set by the final rule, 0.5 
percent TWA and 3.0 percent STEL, when considered in conjunction with 
the requirements of Sec. 75.322 and the requirement for oxygen, will 
provide persons working or traveling in these areas with a safe and 
healthful working environment. MSHA recognizes that the effects of 
carbon dioxide are both chronic and acute and, therefore, sets both a 
TWA and a STEL. NIOSH, in recommending a standard for carbon dioxide, 
also recognized this and recommended a similar approach. The NIOSH 
recommendation, made in a Criteria Document published in 1976, proposed 
a TWA concentration of 1.0 percent and a ceiling value of 3.0 percent 
not to exceed 10 minutes. In making this recommendation, NIOSH 
recognized that there are additive stress effects of increased carbon 
dioxide concentrations and exercise. As support for this, the NIOSH 
document cites research that showed that healthy, trained subjects 
exposed to 2.8 to 5.2 percent carbon dioxide at maximum exercise levels 
experienced respiratory difficulty, impaired vision, severe headache, 
and mental confusion; three subjects collapsed.
    During rulemaking on the proposed air quality standard, NIOSH 
recommended a 0.5 percent TWA and a 3.0 percent STEL. NIOSH made a 
similar recommendation to the Occupational Safety and Health 
Administration during that Agency's permissible exposure limit 
rulemaking. Given the work environment in bleeder entries and worked-
out areas, as described earlier, MSHA believes that the regulatory 
approach to bleeders and worked-out areas provided by the final rule is 
necessary and appropriate. In addition to examiners, other miners may 
be required to work in the bleeder entries and worked-out areas, 
performing duties such as installing roof support, pumping water, 
recovering materials or adjusting ventilation. The levels established 
in the final rule would provide these miners with the necessary 
protection.

Section 75.323  Actions for Excessive Methane

    Section 75.323 establishes the actions that must be taken when 
methane reaches certain levels. Methane is the most dangerous gas 
encountered by miners working underground. When the level of methane 
reaches 5.0 percent it is explosive. Section 75.323 generally 
establishes action levels below this lower explosive limit to permit 
appropriate actions to be taken by mine operators in order to prevent 
an explosion.
    The final rule adopts the proposal for Sec. 75.323. In doing so, it 
revises paragraphs (b)(1)(ii), (c)(1), and (d)(2)(i) of the existing 
standard. The rule clarifies that corrective actions at specified 
methane levels must be taken ``at once'' and provides that actions for 
excessive methane include areas where mechanized mining equipment is 
being installed or removed. MSHA believes that final rule Sec. 75.323 
increases the protection afforded by the existing standard.
    Initially, the need for clarification was raised during 
informational meetings and subsequent discussions after publication of 
the existing rule. As discussed below, the final rule retains the 
language of the proposal which is identical to the wording of the 
previous standard.
    Some commenters indicated that delays in remedial actions to reduce 
methane were being experienced at some mines. These commenters 
attributed delays to the deletion of the phrase ``at once'' in the 
existing standard. These commenters also suggested that the phrase ``at 
once'' conveys the proper sense of urgency to correct the condition. 
Other commenters stated that the addition of the phrase ``at once'' 
does nothing to improve health or safety. MSHA has included the phrase 
in the final rule for clarity.
    Methane poses a significant hazard to miners when it is permitted 
to accumulate without corrective action being taken quickly. MSHA has 
always intended that corrective changes be made at once. The final rule 
revises paragraphs (b)(1)(ii), (c)(1) and (d)(2)(i) to require that 
these changes be made ``at once,'' the phrase used in former 
Secs. 75.308 and 75.309.
    Some commenters stated that the proposal, if literally enforced, 
would necessitate changes to be made before the cause or source of the 
increase in methane can be investigated. Other commenters stated that 
approvals must be obtained for many ventilation changes and that some 
changes require extended periods of time to complete. Operators may 
take those actions necessary to abate imminent dangers or hazardous 
conditions, or to safeguard persons and equipment. A part of this 
action would be a determination of the cause of the problem. MSHA knows 
of no case where an operator has been prohibited from a necessary 
correction for a methane problem pending a plan approval. However, in 
cases where intentional changes are made which could materially affect 
the safety and health of miners, approval is required before resumption 
of normal work if the changes affect the information approved in the 
mine ventilation plan. MSHA recognizes that some ventilation changes 
take time to accomplish and interprets the phrase ``at once'' as 
meaning that the work of making the necessary change to reduce methane 
levels begins immediately.
    One commenter questioned how the phrase ``at once'' would apply to 
a methane feeder which is encountered despite an appropriate and well 
thought out ventilation change. MSHA recognizes that methane feeders 
may be encountered unexpectedly. As long as a mine operators takes 
action as required by the standard, they will be in compliance.
    One commenter suggested that some MSHA personnel were improperly 
interpreting methane excursions above 1.0 percent to be violations of 
the standard. The commenter seemed to suggest the regulations should 
provide that the actions specified in Sec. 75.323 for excessive methane 
do not apply to concentrations detected on machine-mounted methane 
monitors. Other commenters indicated that the standard requires 
unnecessary ventilation 

[[Page 9778]]
changes in response to instantaneous increases caused by excessive 
methane liberation. MSHA recognizes that instantaneous methane monitor 
readings for machine mounted monitors may occasionally reach or exceed 
1.0 percent. Usually, these are short-lived and the monitor reading 
quickly falls below 1.0 percent, even before the machine operator can 
react. However, consistent monitor readings of 1.0 percent or more 
indicate a problem and should cause appropriate changes and 
adjustments. Repeated short duration increases above 1.0 per cent 
should also be cause for concern and may necessitate changes or 
adjustments to ventilation.
    With respect to paragraphs (b)(1), (b)(2), and (c)(1) some 
commenters stated that the mere presence of methane does not constitute 
a violation of a mandatory health and safety standard. MSHA agrees. In 
this context, one commenter suggested replacing the word ``present'' 
with ``detected.'' The commenter continued that an operator cannot 
possibly correct a methane problem until it has been detected, that the 
rule should reflect realistic expectations, and that the current term 
``present'' is meaningless. MSHA agrees that a methane problem cannot 
be corrected unless it has been detected and that the mere presence of 
methane does not constitute a violation. Only the failure to properly 
respond once being made aware of the presence of methane in excess of 
allowable levels is a violation. The standard requires that an operator 
properly conduct an examination; and if methane over 1.0 percent or 1.5 
percent is found, as applicable, corrective action must be taken at 
once.
    When 1.0 percent or more methane is present in a working place, an 
intake air course, or an area where mechanized mining equipment is 
being installed or removed, paragraph (b)(1)(i) of the final rule 
requires all electrical, diesel, and battery- powered equipment in the 
affected working place, intake air course, or other area, except for 
intrinsically safe AMS, to be deenergized or shut off. Deenergizing or 
shutting off of this equipment protects miners by preventing this 
equipment from providing ignition sources.
    One commenter suggested that non-intrinsically safe AMS equipment 
should be permitted to run under battery power when 1.0 percent or more 
methane is encountered. The commenter stated that the benefit derived 
through the system's operation outweighs the hazard of the non-
intrinsically safe system. The commenter continued that since the 
batteries will deplete quickly, little hazard would result, or in the 
alternative, each battery outstation could be monitored for methane and 
automatically trip at some set methane level. The final rule does not 
include this suggestion. Where excessive methane concentrations 
necessitate that power be deenergized, information from continued 
operation of the non-intrinsically safe system would not outweigh the 
potential ignition hazard. To permit operation of a non- intrinsically 
safe system in areas known to contain excessive levels of methane would 
be a departure from accepted, effective, and long standing safety 
practice.
    Several commenters objected to the requirement in paragraph 
(b)(1)(iii) that prohibits any work in the affected area until the 
methane is reduced to less than 1.0 percent. Commenters questioned 
whether the standard would prohibit an operator from taking steps to 
reduce the methane. The language must be given a reasonable 
interpretation and should be considered in context of the preceding 
requirement in paragraph (ii) that ``changes or adjustments shall be 
made at once * * * ''
    These requirements are virtually identical to those found in the 
previous standard which was in effect for over 20 years. MSHA is 
unaware of any instance where an operator was prohibited from 
correcting methane problems by such an application of the standard.
    Some commenters suggested adding a phrase to paragraph (b)(1)(iii) 
to read, ``No work other than removal of the accumulation shall be 
permitted * * * '' Similarly, MSHA believes that the suggested change 
is unnecessary and has not adopted it. MSHA experience indicates that 
the rule is well understood and has been properly applied.
    Other commenters thought that the standard, as proposed, would 
cause hasty, ill-advised changes to be made and would prohibit an 
investigation into the cause or source of the methane problem which 
could result in phased-in corrections. MSHA agrees that operators 
should seek long term solutions and should fully investigate the cause 
or source of methane accumulations. Investigation and long term 
corrections are not prohibited by the rule. However, the final rule 
does require that certain actions be undertaken at once to correct the 
short term or acute safety hazards resulting from accumulations of 
methane.
    If 1.5 percent or more of methane is present in a working place, an 
intake air course, or an area where mechanized mining equipment is 
being installed or removed, paragraph (b)(2) of the final rule requires 
persons to be withdrawn from the affected area. The presence of methane 
in these areas can pose a significant risk to miners and therefore 
their withdrawal from the affected area is essential to their safety. 
Paragraph (b)(2) also requires that all electric power to equipment in 
affected areas be disconnected at the power source. This prevents 
accidental energization of equipment and removes power from cables and 
circuits which may also be ignition sources. No other work is permitted 
in the affected area until the concentration of methane is less than 
1.0 percent. A conforming change is also made to paragraph (b)(2) by 
adding ``mechanized'' before mining equipment for consistency with 
other provisions of the rule.
    Comments were received which objected to the (b)(2)(ii) requirement 
that except for intrinsically safe AMS, electrically powered equipment 
in the affected area shall be disconnected at the power source. Some 
commenters suggested that this equipment should be simply 
``deenergized.'' These commenters stated that there was no need to 
disconnect the power source, that this could require belt drives, 
pumps, etc. to be physically disconnected where permanent connections 
have been made, which could result in a major unnecessary operation. 
MSHA has not adopted this suggested revision. MSHA issues numerous 
citations and orders for damaged power cables, trailing cables, and 
splices where the conductors are badly damaged or exposed. Each of 
these citations and orders represents the presence of a potential 
ignition source. Power cables would remain energized under these 
conditions as would be the case if the commenters' suggestion were 
adopted.
    There are several aspects of Sec. 75.323 which were not proposed 
for revision, but for which comments were received. Comments were 
received relative to the 1.0 percent action level in intake air 
courses. Commenters contended that Congress established an immutable 
methane limitation of 0.25 percent in intakes. Commenters stated that 
because Congress had expressly limited intakes passing openings to 
abandoned areas to 0.25 percent methane, that implicitly, all intakes 
were limited to 0.25 percent methane. However, the commenter then 
suggested adopting an intake action level for methane of 0.5 percent. 
MSHA notes that the methane levels were not proposed for revision and 
are not being revised under the final rule. The commenters, however, 
should refer to a discussion of this issue included in the 

[[Page 9779]]
preamble to the existing rule dated May 15, 1992.
    If 1.5 percent or more methane is present in return air, paragraph 
(d)(2)(i) would require changes or adjustments be made ``at once'' to 
the ventilation system to reduce the concentration of methane. Because 
of the hazards presented by accumulations of methane, MSHA believes 
that changes or adjustments should be made immediately and be made 
independent of the mine ventilation plan in the interest of safety. 
MSHA recognizes that some changes take time to complete. If operators 
begin ``at once'' to make the necessary changes and adjustments, they 
will be in compliance with the standard.
    MSHA received comments relative to Sec. 75.323 which, although were 
outside the scope of the rulemaking, demonstrate an incorrect 
understanding of the existing rule. The limitations on methane content 
and the associated actions required when excessive methane is 
encountered are important components of a safety program to protect 
underground miners. Therefore, several of these comments will be 
addressed so that the mining community will better understand these 
standards.
    First, one commenter objected to the existing requirements in 
Sec. 75.323(d). The commenter incorrectly stated that paragraph (d) 
permits normal operations with 1.5 percent methane in working places. 
Methane limits in working places and intake air courses is limited by 
Sec. 75.323(b). Paragraph (b) specifies actions if 1.0 percent methane 
is present, and withdrawal if 1.5 percent is present. Similarly, 
Sec. 75.323(c) limits methane between the last working place on a 
working section and where that split of air meets another split of air 
to 1.0 percent and requires withdrawal at 1.5 percent. Paragraph (d) 
modifies the requirement for that portion of the return split outby the 
section loading point and has no effect on methane either in working 
places or between the last working place and the point in the return 
opposite the loading point.
    One commenter indicated a preference for the language used in a 
previous MSHA regulation, Sec. 75.308-1. The previous standard 
restricted the changes or adjustments to increasing the quantity or 
improving the distribution of air in the affected working place to an 
extent sufficient to reduce and maintain the methane to less than 1.0 
percent. The existing rule establishes a performance standard that 
allows for several methods of compliance. One acceptable method of 
compliance is to limit the rate of production of coal to permit the 
existing ventilation system to maintain the level of methane below 1.0 
percent. In all cases, however, increasing the quantity or distribution 
of air continues to be an accepted means of reducing methane levels. No 
safety benefit would be derived from disallowing reduced coal 
extraction rates as a means of maintaining methane levels under 1.0 
percent.
    The final rule retains the language of proposed 
Secs. 75.323(b)(1)(i), 75.323(b)(1)(iii), and 75.323 (b)(2)(i) and 
(b)(2)(ii) which is identical to the wording of the existing standards. 
An in-depth discussion of the reproposal of provisions concerning the 
installation and removal of mechanized mining equipment is presented in 
the General Discussion section of this preamble.

Section 75.324  Intentional Changes in the Ventilation System

    This section addresses the precautions that must be taken when a 
significant change is made to the ventilation system. MSHA did not 
propose any change to existing Sec. 75.324 and is not making any 
revisions in the final rule.
    Questions had been raised concerning the language, ``materially 
affect the safety or health of persons in the mine'' that appears in 
the existing standard. The phrase is important in that it identifies 
those ventilation changes that require approval of the MSHA district 
manager under Sec. 75.370(c). MSHA regards it as impractical to follow 
a ``cookbook'' approach to identifying what will or will not require 
approval. Each particular circumstance is to be reviewed by the 
operator on its own merits. To illustrate the Agency's expectations, 
the following is a list of some examples of what MSHA considers 
intentional changes that would materially affect the safety or health 
of miners. These examples are not meant to include all possibilities, 
but are meant to provide some general guidance: adding a new shaft; 
bringing a new fan on line; changing the direction of air in an air 
course; changing the direction of air in a bleeder system; shutting 
down one fan in a multiple fan system; starting a new operating section 
with ventilating quantities redistributed from other sections of the 
mine; changing entries from intakes to returns and vice versa; and any 
change that affects the information required by Sec. 75.371, Mine 
ventilation plan; contents.
    Comments were specifically solicited on issues raised in the 
preamble discussion to the proposal. In response, written comments were 
received from one commenter. These comments were reinforced by several 
speakers at the public hearings. Other commenters indirectly referred 
to Sec. 75.324 and stated that the phrase, ``materially affect the 
safety or health of persons in the mine'' is accepted and understood by 
the mining community.
    One commenter suggested that the person designated by the operator 
to supervise ventilation changes should be a certified person that is 
knowledgeable of the mine's ventilation system. The results of changes 
to a complex ventilation system are not always easy to predict, and for 
that reason caution must be used when making significant changes to one 
air split or several air splits. The balance of splits can be affected 
and may result in air reversals, dead air spaces, or insufficient air 
flow in critical areas. For this reason, such changes must be evaluated 
by a certified person examining the affected areas to determine that 
the areas are safe before production is resumed. Therefore, the Agency 
believes that it is to be an unnecessary burden to also have 
ventilation changes supervised by a certified person. Thus, the 
suggestion of the commenter has not been adopted in the final rule.
    This commenter also suggested that the provisions of Sec. 75.324 
should apply to all intentional changes which alter the air current in 
any section or area of the mine by 10 percent or more, or by 9,000 cfm 
or more, whichever is less and that such change be considered to affect 
the entire mine. The commenter recommended the miners' representative 
be afforded the right to accompany the certified person to evaluate the 
effects of the ventilation change and that a preshift examination of 
the mine be conducted to assure that the mine is safe before electric 
power is restored.
    The commenter also suggested that a record be maintained of all 
ventilation changes to include the names of all persons involved with 
the change, the date and time of the change, and results and locations 
of air quality and quantity measurements taken both before and after 
the change. The commenter stated that the record should be made in an 
approved book within 24 hours of the change and that the record should 
be signed and countersigned. Finally, the commenter recommended that 
the mine ventilation map should be updated immediately after the 
ventilation change is made and that within 24 hours of the change, the 
updated map should be made available to the miners' representative and 
a copy sent to the district manager. Section 75.370(c) requires that 
any change to the ventilation system that alters the main 

[[Page 9780]]
air current or any split of the main air current in a manner that could 
materially affect the safety or health of the miners, or any change to 
the information required in Sec. 75.371 shall be provided to and 
approved by the district manager before implementation. The final rule 
requires that this information be provided to the miners' 
representative at least 5 days before submittal to the district manager 
(See Sec. 75.370 for full discussion). MSHA believes that this 
provision provides necessary protection for miners.
    One commenter stated that the standard is reactive and that MSHA 
routinely cites mine operators after a methane explosion or ignition. 
MSHA believes that the standard is designed to assure that operators 
are proactive and develop plans that prevent hazardous conditions. The 
Agency anticipates that with the clarification provided through this 
rulemaking, operators will obtain MSHA approval prior to making 
intentional ventilation changes that materially affect the safety and 
health of miners, thereby preventing potentially hazardous conditions. 
When questions arise as to whether an anticipated change requires prior 
approval, MSHA is available to provide guidance as to whether approval 
is necessary.

Section 75.325  Air Quantity

    The quantity of air in cubic feet per minute (cfm) is an important 
measure of underground coal mine ventilation. It is essential for 
miners' health and safety that each working face be ventilated by a 
sufficient quantity of air to dilute, render harmless, and carry away 
flammable and harmful dusts and gases produced during mining. An 
insufficient quantity of air at a working face could permit methane to 
accumulate and lead to an explosion. Section 75.325 generally 
establishes the quantities of air that must be provided and the 
locations underground where these quantities must be provided.
    Section 75.325(d) requires that areas where mechanized mining 
equipment is being installed or removed be ventilated and that the 
minimum quantity of air and the ventilation controls necessary to 
provide these quantities be specified in the approved mine ventilation 
plan. The final rule adds the word ``minimum'' to the phrase, 
``quantity of air'' that appears in the existing standard and the 
proposal. The existing standard was reproposed without change. An in-
depth discussion of the reproposal of provisions concerning the 
installation and removal of mechanized mining equipment is presented in 
the General Discussion section of this preamble.
    Only a few comments were received that were specific to paragraph 
(d). One commenter discussing Sec. 75.371(r) suggested that the 
quantity of air required by Sec. 75.325(d) to be specified in the plan 
should represent the ``minimum'' quantity to be provided and that the 
location specified should be identified as typical so as to give the 
mine the flexibility to adapt to conditions. This comment is consistent 
with MSHA's intent for the proposal and helps to clarify it. Therefore, 
the word ``minimum'' has been inserted into the final rule in both 
Sec. 75.371(r) and paragraph (d) of Sec. 75.325. Obviously, mine 
operators can have air quantities which exceed the minimum specified in 
the mine ventilation plan. MSHA agrees conceptually with a comment that 
the ventilation scheme shown in the plan should be representative of 
the method of ventilation to be used. However, MSHA does not adopt this 
comment because the plan must also be specific enough so that the 
operator, the miners, the representative of miners, and MSHA are 
assured that the areas are being adequately ventilated.
    Other commenters suggested that the total quantity of air to be 
delivered to a longwall needs to be specified in the mine ventilation 
plan. In support of the suggestion the commenter stated that the 
inclusion of the word ``total'' recognizes that some mines may use belt 
air at the set up or tear down phase while some intake air may be 
diverted to ventilate bleeders, battery chargers or compressors and, 
therefore, the total quantity of air being delivered to the longwall 
face should be the figure with which MSHA is concerned. The commenter 
stated further that the recommendation recognizes that conditions vary 
greatly from mine to mine, coal seam to coal seam, even from one 
longwall panel to the next panel of the same mine. The commenter added 
that while a specified amount of air can be delivered to a recovery 
face, and pressure can be placed on the gob, it is impossible to 
guarantee a specified volume or velocity of air at the recovery point.
    MSHA agrees that the total air quantity provided to a recovery face 
is of importance; however, the distribution of this air is also 
important. The volume of air being delivered to the longwall face 
during equipment removal is important because of the types of 
activities that occur (e.g. cutting and welding and the operation in 
some cases of considerable numbers of diesel powered vehicles) and the 
fact that it is along the face that the majority of miners work and 
where an ignition hazard exists. It is important to know exactly how 
areas where mechanized equipment is being installed or removed will be 
ventilated. Therefore, this suggestion has not been included and the 
rule.
    Commenters were concerned about the ventilation of a longwall face 
prior to the first gob fall. This type of concern should be handled 
through the mine ventilation plan. Paragraph (d) only deals with areas 
were mechanized mining equipment is being installed or removed and not 
where mining is in progress.

Section 75.330  Face Ventilation Control Devices

    The final rule adds a new paragraph (c) adopting the proposal 
language. The new paragraph (c) requires that when line brattice or any 
other face ventilation control device is damaged to an extent that 
ventilation of the working face is inadequate, production activities in 
the working place are required to cease until necessary repairs are 
made and adequate ventilation is restored. MSHA notes that before 
issuing a citation for a violation of this provision, an inspector 
would normally be expected to measure the air quantity to determine 
whether adequate ventilation is being maintained.
    Some commenters considered the proposed regulation redundant since 
operators must already maintain minimum air quantities at the face, 
thereby making repairs necessary to maintain the required quantity. 
Face ventilation controls are a critical feature of reliable 
ventilation. As such, maintaining these controls in good condition and 
making repairs necessary to restore ventilation is sound safety 
practice. To do less invites increased risk of a methane ignition and 
elevated respirable dust. Also on a practical level most miners on a 
working section do not have a means of measuring air quantities. 
However, miners can determine when ventilation controls are damaged 
appreciably and are likely to adversely affect the air quantity.
    One commenter indicated that entire working sections might be shut 
down to repair a ventilation control at any one face with no 
corresponding safety benefit. The final rule provides that ``production 
activities in the working place shall cease'' until adequate 
ventilation is restored. Unless elevated methane levels or some other 
problem existed, the entire section would not be shut down for repair 
of a ventilation control.
    Some commenters asserted that controls may be slightly damaged 
while still maintaining quantities in excess of 

[[Page 9781]]
the requirements at the face. Similarly, commenters worried that 
numerous citations would be issued based solely on the appearance of 
the controls, even though the minimum required face air quantities are 
exceeded. These commenters stated that the only reliable indicator is 
an air measurement.
    MSHA agrees that the only precise indicator of air quantity is a 
measurement. Accordingly, MSHA anticipates that noncompliance decisions 
will be based on air measurements which show ``ventilation of the 
working place is inadequate.'' However, ventilation controls which are 
in poor condition are likely to cue an inspector to conduct an air 
measurement.
    Other commenters generally expressed the view that the requirements 
of Sec. 75.330, even considering the proposed revision, are inadequate 
to fully address the issue of face ventilation. According to these 
commenters, additional requirements are needed, including: proper 
installation and maintenance criteria for face ventilation control 
devices, requirements for providing devices continuously from the last 
open crosscut to the working face, immediate repair of these devices if 
damaged by a fall or otherwise, providing sufficient space between the 
line curtain and the rib and maintaining the area free of obstructions, 
and minimizing leakage while providing installations which permit 
traffic to pass without adversely affecting ventilation. Further, the 
commenters asserted that only cumulatively can the desired result be 
obtained through these requirements and that additional requirements 
would empower individual miners to take corrective actions when needed.
    Each of these suggestions is a desirable ventilation practice which 
MSHA supports. However, the final rule is not intended to set detailed 
standards for the installation of ventilation control devices. Instead, 
the rule addresses minimum requirements for face air quantities and 
requires the face ventilation system used to deliver these quantities 
to be maintained.
    Some commenters indicated a concern about so-called ``deep-cut'' 
mining wherein continuous miners, by remote control, develop cuts from 
25 to 60 feet inby permanent roof support. Commenters questioned the 
adequacy of face ventilation where ventilation controls may be 30 to 50 
feet from the face. Specifically, questions were raised about: whether 
adequate ventilation actually reaches the face in ``deep cuts'' to 
dilute methane; whether more frequent air measurements are needed; 
whether methane checks are representative of face concentrations; 
maximum feasible cut depth and ventilation device distance; respirable 
dust in ``deep cuts;'' proper maintenance of ventilation control 
devices; how ventilation is maintained after the continuous miner is 
withdrawn from the cut; roof bolter ventilation; and differences 
between scrubber systems and sprayfan systems. Another commenter noted 
that historically most roof fall fatalities have occurred within 25 
feet of the face. This commenter asserted that the deep-cut mining 
system helps to resolve this problem and reduce exposure. The commenter 
continues that to prohibit any variation from the 10 foot line curtain 
distance requirement would adversely affect safety of the miners 
working in the area.
    MSHA agrees that each of these issues is important. The appropriate 
vehicle to address these specific concerns is the mine ventilation plan 
required by existing Sec. 75.370. The mine ventilation plan provides 
the necessary latitude to address the diversity of mining conditions 
found throughout the country. Details of each system must be shown in 
the plan and must be specific to the conditions at each mine where such 
a system is employed. Also, MSHA's review and approval of mine plans 
includes an onsite investigation to evaluate the system and to assess 
the adequacy of the specified plan parameters. In addition, inspectors 
routinely evaluate the suitability of the mine ventilation plan during 
regular mine inspections.
    The commenter's concerns about methane checks in ``deep cuts'' is 
addressed by the final rule Sec. 75.362(d)(2) which requires that 
methane tests be made ``at the face.'' This new requirement will assure 
that measurements are taken at the location where the hazard is most 
likely to occur. Testimony received at the public rulemaking hearings 
indicated that technology exists in the form of extendable probes that 
can be used to take these measurements, without putting miners at 
additional risk from fall of ground.

Section 75.332  Working Sections and Working Places

    Working sections and working places are the areas of a coal mine 
with the greatest amount of activity and the largest concentration of 
workers. They are the location of the greatest number of potential 
ignition sources. They therefore harbor the greatest risk of accidents 
such as methane ignitions and explosions and equipment fires. Section 
75.332 addresses the ways these areas are ventilated to reduce the 
likelihood of an accident on one section impacting another section, 
with deadly consequences. Generally, Sec. 75.332 provides that each of 
these areas must be ventilated with a separate split of fresh air that 
has not been used to ventilate another working area or an area where 
mining has ceased if this area cannot be examined. When ventilated in 
this manner, the products from a fire on one section will not 
contaminate another section and methane in worked-out areas will not be 
carried to working sections by the ventilating air stream.
    The final rule provides that each working section and each area 
where mechanized mining equipment is being installed or removed, shall 
be ventilated by a separate split of intake air directed by overcasts, 
undercasts or other permanent ventilation controls. The final rule 
adopts the language of proposed Sec. 75.332(a)(1), which is identical 
to existing Sec. 75.332(a)(1). An in-depth discussion of the reproposal 
of provisions concerning the installation and removal of mechanized 
mining equipment is presented in the General Discussion section of this 
preamble.
    Several commenters responded to Sec. 75.332(a)(1). Some commenters 
suggested that the standard be revised to permit the installation of 
mechanized mining equipment in either the return or intake air courses 
of working sections provided the air had not been used to ventilate any 
worked-out areas, areas where pillars have been recovered, or bleeder 
systems. The commenters maintained that prohibiting the installation of 
longwall equipment on the same split of air as a developing unit delays 
the installation of a mining system. The commenters further observed 
that this mining equipment consists mainly of steel conveyor sections 
and roof supports that contain a 95 percent water-based hydraulic fluid 
which does not burn. Therefore, according to these commenters, longwall 
mining equipment can safely be installed on the intake side of an 
active mining unit and, with monitoring, in the return air course of an 
active mining unit.
    The safety benefits of using separate splits of air to provide 
ventilation are well established. A primary benefit of such a provision 
is to protect workers down-wind from being put at risk by events up-
wind from their location. Among the most serious of these risks is 
miners being overcome by the products of combustion or an explosion.
    In Miner's Circular 50, ``Explosions and Fires in Bituminous-Coal 
Mines'' published by the Bureau of Mines in 

[[Page 9782]]
1954, the authors state that when air travels a long path through a 
mine, it gradually becomes depleted of oxygen and may become so 
contaminated with other gases that it no longer is healthful, or it may 
accumulate enough explosive gas to present an explosion hazard. The 
authors go on to state that when the air is divided into several 
splits, each traveling a short path, better air can be furnished to 
each group of persons in the mine. Further, if a local explosion or 
fire should occur, the poisonous gases evolved may be confined to one 
section and the force of the explosion and the gases may kill all the 
persons in that particular section but may not affect other sections of 
the mine. According to the authors, when a mine is ventilated by a 
continuous current of air, the miners on the return side of an 
explosion or fire probably will be killed or overcome by the poisonous 
gases and that judicious splitting of the air is a safeguard against 
this eventuality.
    Similarly, Stefanko states in the 1973 edition of the Society of 
Mining Engineers (SME) Engineering Handbook that splitting the air is 
recognized as being necessary for safety and presents only minimal 
power cost.
    The commenters implied that because longwall mining equipment is 
largely noncombustible, this danger is minimized for workers down-wind 
on an active mining section. This reasoning overlooks the fact, 
however, that the installation of a longwall is labor-intensive, 
involving cutting and welding in the presence of methane and coal, as 
well as machinery operating under load. These conditions add 
contaminants to the ventilating current, and increase the possibility 
of a fire or explosion. Likewise, a longwall being installed on the 
return side of an active mining section would expose the miners doing 
the installation to the dust and gases, and the results of a fire or 
explosion, from the section. Even with monitoring, miners would be put 
at risk as their opportunities for escape would be limited. For these 
reasons, the final rule does not adopt the commenters'' suggestion.
    One commenter also suggested that ``approved ventilation controls'' 
be required instead of specifying that overcasts, undercasts or other 
permanent ventilation controls be used to direct intake air. The 
commenter explained that this would allow operators the flexibility of 
submitting plans that allow the use of temporary controls in some 
instances.
    Temporary controls to split air are not as reliable as permanent 
controls. The first explosion at the Scotia Mine in 1976 which killed 
15 miners, was due in part to the improper use of a temporary 
ventilation control where a permanent control (i.e., an overcast) 
should have been used. More recently, the explosion that occurred 
during the set up of a longwall at the Golden Eagle Mine in 1991 which 
injured 11 miners involved the removal of two permanent ventilation 
controls and the replacement of these controls with temporary controls. 
As these and other accidents illustrate, the ventilation controls that 
deliver air to working areas are vitally important to miners'' safety. 
Therefore, the final rule requires that these controls be permanent in 
nature and not temporary.
    Another commenter indicated that the use of temporary controls 
would lower worker exposure to hazards by not requiring repeated 
handling of permanent control materials which can be heavy. Proper 
handling practices and modern materials can reduce the risk of injuries 
associated with handling construction materials. MSHA considers these 
risks lower than the dangers of using temporary controls in lieu of 
permanent controls.

Section 75.333  Ventilation Controls

    The primary means for directing air from the outside, through the 
mine openings, to the working areas and back to the surface is through 
the use of ventilation controls: either permanent controls, such as 
stoppings (walls), overcasts or undercasts (air bridges), and doors, or 
temporary controls, such as line brattice (curtains). Permanent 
ventilation controls are designed for long term use while temporary 
controls are intended for use on a short term basis. In general, 
Sec. 75.333 specifies where each type of control can be used and how 
each permanent control is to be constructed. It is essential that 
ventilation controls be correctly constructed, maintained, and properly 
located to provide ventilation to working sections and other areas 
where it is needed to dilute methane, respirable coal mine dust and 
other contaminants, and provide miners with a safe and healthful work 
environment.
    The final rule revises paragraphs (a), (b)(1), (b)(3), (b)(4) and 
(e)(1) of existing Sec. 75.333, and adds a new paragraph (h). Revisions 
to paragraphs (a) and (e)(1) address the durability of stoppings, while 
the revisions to (b)(1), (b)(3) and (b)(4) address ventilation controls 
required when continuous haulage systems are used. New paragraph (h) 
requires all permanent ventilation controls, including seals, to be 
maintained to serve the purpose for which they were built.
    The use of continuous haulage systems, particularly in low seam 
coal mines, is becoming more common. The final rule specifically 
addresses continuous haulage systems in paragraphs (b)(1), (b)(3) and 
(b)(4) of the rule and clarifies where temporary controls are an 
acceptable means of ventilation control when these systems are used. 
Continuous haulage systems utilize mobile bridge conveyors or similar 
mechanisms to transport coal directly from a continuous mining machine 
to a low profile belt. As the continuous mining machine moves from 
place to place, the continuous haulage system slides back and forth 
along a low profile conveyor belt using a ``dolly'' or other travel 
mechanism. The low profile conveyor belt then transports the coal to 
the section conveyor belt.
    The existing rule permits the use of temporary ventilation controls 
in lieu of permanent ventilation controls to separate continuous face 
haulage systems from return, intake, and primary escapeway entries in 
rooms developed 600 feet or less from the centerline of the entry from 
which the rooms were developed. This practice is consistent with 
longstanding MSHA policy, which recognizes that these rooms are used 
for a short duration and the minimum air quantity must be maintained 
regardless of the controls used.
    Existing paragraph (b)(1) allows temporary controls to separate 
intake and return air courses in rooms driven 600 feet or less from the 
centerline of the entry from which the room was developed. The final 
rule adds to existing paragraph (b)(1) the proposed language clarifying 
that the use of temporary controls in these rooms is also acceptable 
when continuous haulage systems are used. This change responds to 
commenters who point out that the rooms in which the continuous haulage 
systems are installed are continuously attended by the operators of the 
system and an immediate response to any safety related problem with the 
system or the ventilation controls would be expected. Commenters also 
noted that two or three rooms are often concurrently developed using a 
continuous haulage system and the life of the actively developing rooms 
is often less than three days. As a result of this short life, mining 
in these rooms is often completed before construction of permanent 
controls is finished. Also, access to the continuous haulage system is 
required through crosscuts for maintenance and operation of the system.
    Under paragraphs (b)(3) and (b)(4) the proposal would have required 
belt and 

[[Page 9783]]
intake separation to the outby travel point of the dolly and belt and 
primary escapeway separation to the inby most travel point. Commenters 
indicated confusion because of the distinction between intake and 
primary escapeway separation and believed that conflicts would exist. 
Commenters also suggested that the language proposed to address the use 
of temporary ventilation controls for continuous haulage systems was 
confusing and contradictory. The final rule revises the requirements of 
proposed paragraphs (b)(3) and (b)(4) to respond to these comments.
    Paragraph (b)(3) of the final rule retains the requirement that 
permanent controls be provided to separate belt conveyor haulageways 
from intake air courses when the air in the intake air course is used 
to provide air to active working places. The final rule also retains 
the proposed provision that when continuous haulage systems are used in 
rooms less than 600 feet from the centerline of the entry from which 
the rooms were developed, temporary stoppings or other temporary 
ventilation controls may be built and maintained to provide the 
required separation.
    Commenters stated that new technology may result in continuous 
haulage systems with the outby point of travel of the dolly extending 
considerably beyond the 600 feet distance. The commenters noted that 
such an extended length of temporary controls could result in 
unanticipated adverse consequences for the ventilation system, and 
suggested that a maximum distance of 300 feet outby the inby point of 
travel of the dolly be established for the use of temporary ventilation 
controls. MSHA agrees that extensive use of temporary ventilation 
controls can create problems, including excessive leakage and the 
possible short circuiting of air. The final rule, therefore, limits the 
distance that temporary controls may be used to separate continuous 
haulage systems from intake air courses, including the primary 
escapeway. The final rule permits temporary controls to be used from 
the point of deepest penetration of the conveyor belt entry to the most 
outby point of travel of the dolly or 600 feet, whichever distance is 
the less. As a result, 600 feet is the maximum linear distance of entry 
in which temporary controls may be used for separation of air courses. 
The 600 feet would be measured as a straight-line distance from the 
point of deepest penetration in the conveyor belt haulage entry. This 
approach comports with the 600 foot limit for the use of temporary 
stoppings in rooms and allows a reasonable use of temporary ventilation 
controls with continuous haulage systems, while preserving the 
integrity of the ventilation system. At present, MSHA would expect that 
the most outby point of travel of the dolly would govern since MSHA is 
not aware of any continuous haulage systems which travel more than 600 
feet outby the point of deepest penetration.
    Paragraph (b)(4) of the final rule continues to require permanent 
stoppings or other permanent ventilation control devices to separate 
the primary escapeway from the belt and trolley haulage entries, as 
required by Sec. 75.380(g). Commenters suggested that for the purposes 
of Sec. 75.380(g), the definition of loading point in proposed 
paragraph (b)(4) be revised to be the outby point of travel of the 
dolly as opposed to the inby point of travel. The final rule adopts 
this suggestion and requires separation by permanent stoppings to be 
maintained to the outby point of travel of the dolly or 600 feet from 
the point of deepest penetration, whichever distance is less, to 
separate the haulage entry from the primary escapeway. The provisions 
of Sec. 75.380(g) continue to allow the district manager to require a 
greater or lesser distance for this separation.
    In response to questions about acceptable construction methods and 
materials for permanent ventilation controls (excluding seals) MSHA 
proposed eliminating the definition of ``durable'' in paragraph (a) and 
to modify paragraph (e)(1). The proposal would have required these 
controls to be constructed in a manner and of materials that result in 
a construction that has been tested and shown to have a minimum 
strength of 39 pounds per square foot as tested under ASTM E72-80 
Section 12--Transverse Load-Specimen Vertical, load only (ASTM E72-80). 
The 8-inch hollow-core concrete block stopping with mortared joints, to 
which all other constructions were tied under the definition of durable 
in the existing standard, has been tested and shown to have a minimum 
strength of 39 
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
pounds per square foot.
    MSHA received numerous comments questioning the validity of the 
ASTM E72-80 test for determining acceptability of underground 
ventilation controls. Commenters questioned the appropriateness of a 
strength requirement of 39 pounds per square foot and the relevance of 
this value to the in-mine conditions. After review, MSHA continues to 
believe that use of the ASTM E72-80 test to determine that the relative 
strength of a ventilation control construction is appropriate and the 
final rule retains this standard. However, MSHA sees merit in some of 
the suggestions made by commenters. Commenters suggested that some 
constructions can not be tested according to the ASTM test, some 
constructions that are widely used in coal mines do not meet the 39 
pound per square foot threshold, and the ASTM test can only be run at a 
limited number of locations nationwide.
    After reviewing all of the comments received and based on 
experience with various construction methods and materials used for 
permanent ventilation controls since the inception of the Mine Act, the 
final rule recognizes traditionally accepted construction methods for 
permanent ventilation controls, and retains the ASTM test for new 
materials and methods. Controls made with new materials or methods must 
be comparable in strength to controls made with traditionally accepted 
materials or methods.
    Since the inception of the Mine Act, a number of traditionally 
accepted construction methods have performed adequately and have served 
their intended function of separating air courses. These traditionally 
accepted construction methods are: 8-inch and 6-inch concrete blocks 
(both hollow-core and solid) with mortared joints; 8-inch and 6-inch 
concrete blocks dry-stacked and coated on both sides with a strength 
enhancing sealant suitable for dry-stacked stoppings; 8-inch and 6-inch 
concrete blocks dry-stacked and coated on the high pressure side with a 
strength enhancing sealant suitable for dry-stacked stoppings; steel 
stoppings (minimum 20-gauge) with seams sealed using manufacturer's 
recommended tape and with the tape and perimeter of the metal stopping 
coated with a suitable mine sealant; and lightweight incombustible 
cementatious masonry blocks coated on the joints and perimeter with a 
strength enhancing sealant suitable for dry-stacked stoppings. In 
addition, 4-inch concrete blocks may be used in the above applications 
in seam heights less than 48 inches. Tongue and groove 4-inch concrete 
blocks coated on both sides with a strength enhancing sealant suitable 
for dry-stacked stoppings may be used in coal seams of any height. The 
sealants referred to in this paragraph would be applied in the 
thickness recommended by the manufacturer. MSHA maintains a list of 
sealants which may be used for the above applications. This list is 
available at each MSHA District Office. The final rule would continue 
to permit these traditionally accepted construction 

[[Page 9784]]
methods to be acceptable for the construction of ventilation controls.
    For new construction methods or materials other than those used for 
the traditionally accepted constructions identified above, the final 
rule requires that the strength be equal to or greater than the 
traditionally accepted in-mine controls. Tests may be performed under 
ASTM E72-80 Section 12--Transverse Load-Specimen Vertical, load only, 
or the operator may conduct comparative in-mine tests. In-mine tests 
must be designed to demonstrate the comparative strength of the 
proposed construction and a traditionally accepted in-mine control.
    As with the existing rule, the final rule would require, in 
paragraph (e)(1)(ii), that all overcasts, undercasts, shaft partitions, 
permanent stoppings, and regulators, installed after November 15, 1992, 
be constructed of noncombustible material. Also, like the existing 
standard, the final rule lists materials that would be suitable for 
these controls. The final rule would also continue to prohibit 
ventilation controls installed after November 15, 1992, from being 
constructed of aluminum.
    Paragraph (h) of the proposal would have required that all 
permanent ventilation controls, including seals, be maintained to serve 
the purpose for which they were built. The final rule retains proposed 
paragraph (h) with one revision. One commenter stated that the 
paragraph should require all ventilation controls, including temporary 
controls, to be maintained to serve the purpose for which they were 
built. Given the importance of temporary controls devices in providing 
for adequate ventilation, the final rule requires all ventilation 
controls, both permanent and temporary, including all doors and seals, 
to be maintained to serve the purpose for which they were built. This 
standard applies to all ventilation controls, regardless of the 
construction date.
    Relative to seal maintenance, MSHA does not intend that the 
maintenance requirement be applied to seals located within another 
sealed area. Additionally, the rule does not apply to seals which have 
become consumed within a gob area which is ventilated and evaluated in 
a manner approved in the mine ventilation plan.
    One commenter raised several questions concerning what MSHA would 
consider to be an acceptable temporary stopping. MSHA has not defined 
the term ``temporary ventilation control'' in the rule. The commenter 
stated that, in the preamble to the proposal, MSHA refers to ``properly 
constructed'' temporary stoppings but does not include a standard for 
construction or installation and maintenance of temporary stoppings. 
The commenter adds that temporary ventilation controls are a source of 
potential leakage and are often susceptible to damage from roof and rib 
falls and from mobile equipment. The commenter also refers to several 
accidents where failure to maintain permanent or temporary ventilation 
controls was a critical factor in the accident.
    MSHA agrees that to properly direct the flow of air and provide for 
adequate face ventilation, temporary controls, as well as all permanent 
ventilation controls, must be installed and maintained in an adequate 
manner to control leakage. MSHA has accepted as temporary controls, 
check curtains or other flame- resistant material approved by MSHA that 
are constructed and installed in such a manner to minimize leakage. As 
required by paragraph (h) of this section of the final rule, these 
controls must be maintained to serve the purpose for which they were 
built.

Section 75.334  Worked-Out Areas and Areas Where Pillars Are Being 
Recovered

    Worked-out areas, areas where coal extraction has been completed, 
can pose deadly hazards to miners, including an explosive methane 
accumulation, irrespirable atmosphere, and the possibility of fire from 
spontaneous combustion. Section 75.334 establishes the requirements for 
ventilation of these areas to mitigate these hazards. In general, 
Sec. 75.334 requires that following mining, these areas are to be 
sealed or ventilated. Section 75.334 also specifies the requirements 
for evaluating the effectiveness of the ventilation of worked-out areas 
so operators can determine that the ventilation system is functioning 
as intended.
    The final rule revises paragraph (e) of the existing Sec. 75.334. 
Existing paragraph (e) requires that each mining system be designed so 
that worked-out areas can be sealed. The final rule adds to paragraph 
(e) the proposed requirement that the location and sequence of 
construction of proposed seals be specified in the approved mine 
ventilation plan. Improper location and sequencing of seal construction 
can have a dangerous effect on mine air quality and ventilation. As the 
proper location and sequence of construction of seals is a mine-by-mine 
determination, the mine ventilation plan provides the most workable 
mechanism by which to assure proper air quality and ventilation of the 
mine.
    Several commenters objected to including seal construction sequence 
as part of the information to be submitted for approval in the mine 
ventilation plan. Their rationale was that mining conditions change and 
could result in a change in the sequence of seal construction. The 
construction might then be delayed while approval for the change is 
obtained. These commenters suggested that in some cases, delays in seal 
construction could result in a hazard to miners. Other commenters 
stated that the sequence of construction of seals is more appropriately 
and more easily shown on the mine ventilation map required by 
Sec. 75.372. Another commenter stated that the sequence of construction 
should be subject to approval because the placement of seals if 
improperly installed can cause adverse effects on the ventilation 
system and gob gases. MSHA is sensitive to the concern that a delay in 
approval could result in a hazard to miners and, as explained in the 
preamble discussion of Sec. 75.370, if a delay in seal construction 
would result in a hazard to miners the review and approval of the plan 
can be expedited.
    MSHA agrees with the commenter that the location and sequence of 
seal construction may be more easily, that is, more clearly shown on 
the mine map required by Sec. 75.372 than in the written text of the 
plan submitted under Sec. 75.371. The existing standard permits 
appropriate information required under Sec. 75.371 to be shown on the 
map required by Sec. 75.372. The effect is that the information both 
appears on the ventilation map and in the ventilation plan and is 
subject to approval. The discussion of Sec. 75.371(bb) further 
addresses this point.
    Spontaneous combustion is the process through which coal or other 
materials self heat by the absorption of oxygen. Paragraph (f) of 
Sec. 75.334 addresses mines with a demonstrated history of spontaneous 
combustion and those located in coal seams determined to be susceptible 
to spontaneous combustion. Paragraph (f) requires that the approved 
mine ventilation plan for these mines specify the measures that will be 
used to detect methane, carbon monoxide, and oxygen concentrations 
during and after pillar recovery, and in worked-out areas where no 
pillars have been recovered; the actions that will be taken to protect 
miners from the hazards of spontaneous combustion; and, if a bleeder 
system will not be used, the methods that will be used to control 
spontaneous combustion, accumulations of methane-air mixtures, and 
other gases, dusts, and fumes in the worked-out area. 

[[Page 9785]]

    Through meetings with various segments of the mining community, 
MSHA became aware of a concern that paragraph (f) of existing 
Sec. 75.334 may have been promulgated without the public being provided 
the opportunity to adequately comment. Although MSHA believes that 
existing paragraph (f) was promulgated properly, the Agency reproposed 
paragraph (f) with wording identical to that used in existing 
Sec. 75.334. The purpose of the reproposal was to assure MSHA received 
and considered all pertinent comments.
    Several commenters to the existing rule suggested that bleeder 
systems should not be required for all mines. These commenters stated 
that in some mines the practice of ventilating worked-out areas 
increases the risk of spontaneous combustion by supplying oxygen to 
combustion-prone materials in these areas. They also requested that the 
final rule promulgated in 1992 include provisions to address 
spontaneous combustion. MSHA acknowledged the need to reduce the flow 
of oxygen to areas where there is a likelihood of spontaneous 
combustion, and included in the 1992 rule requirements for mine 
ventilation plans to address spontaneous combustion in mines with a 
demonstrated history of this hazard or mines that are located in coal 
seams determined to be susceptible to spontaneous combustion.
    Experience gained through application of the existing standard has 
demonstrated that a limited number of mines have experienced 
spontaneous combustion problems. Studies by the Bureau of Mines have 
identified the volatile properties of coal seams and have determined 
that certain seams are susceptible to spontaneous combustion. The final 
rule is directed to mines in these seams.
    MSHA is not suggesting that all coal mines will meet the test to 
show susceptibility to spontaneous combustion. A demonstrated history 
or the determination of susceptibility to spontaneous combustion is a 
prerequisite to the applicability of paragraph (f). While it is true 
that all coal oxidizes when exposed to air, this fact is not sufficient 
to make the determination that a coal seam is susceptible to 
spontaneous combustion. MSHA would expect that absent a demonstrated 
history of spontaneous combustion in a mine, an operator would provide 
the necessary data to demonstrate that the mine is susceptible to 
spontaneous combustion so that the provisions of paragraph (f) should 
apply. A number of methods are used to determine the self heating 
tendency of a coal.
    However, MSHA is also mindful that some mines that have a 
spontaneous combustion problem may be unable to reduce the oxygen 
content to a sufficiently low level to mitigate spontaneous combustion. 
For these mines, a bleederless system may not be appropriate. To 
illustrate, it is well known that the oxygen level in a gob varies 
depending on the location where the measurement is made. For example, 
the periphery of a gob normally will have higher oxygen levels than the 
interior of the gob. The oxygen level in the interior of the gob is 
critical when dealing with spontaneous combustion. If conditions are 
such that the oxygen content in critical areas within a gob cannot be 
reduced below that necessary for a methane ignition to occur, a bleeder 
system may provide the most safety. MSHA specifically solicited comment 
on this subject; however, none was received.
    Under paragraph (f)(1), the approved ventilation plans for mines 
that have or are susceptible to spontaneous combustion must specify 
measures to detect methane, carbon monoxide, and oxygen concentrations 
in worked-out areas. These measures must be taken during and after 
pillar recovery and in worked-out areas where no pillars have been 
recovered. The purpose of these measures is to determine if worked-out 
areas will be ventilated or sealed. If the methane concentration or 
other hazards in the worked-out area cannot be controlled while the 
mine is limiting airflow to avoid spontaneous combustion, it may be 
necessary to seal or to ventilate the worked-out area using a bleeder 
system. These measures also help to determine the extent to which the 
worked-out areas can be ventilated without increasing the spontaneous 
combustion hazard.
    Under the provisions of paragraph (f)(2) the operator is required 
to specify in the mine ventilation plan the actions that will be taken 
to protect miners from the hazards of spontaneous combustion. 
Protections from the hazards of spontaneous combustion might include: 
Additional continuous monitoring of fire gases at strategic locations 
underground, increased air sample collection and analysis, trending of 
air contaminant data, increased examinations, and changes to the mine 
ventilation system such as redistribution of air or pressure balancing. 
This requirement would be triggered if the mine has a demonstrated 
history of spontaneous combustion, or, if an evaluation of the 
susceptibility of the coal seam to spontaneous combustion leads to a 
mine operator determination that a bleeder system should not be used.
    One commenter stated that this rule is unnecessary because only a 
limited number of mines actually have a demonstrated spontaneous 
combustion problem. The commenter suggested that the petition for 
modification (variance) process should be used to address this issue, 
which would allow miners representatives to participate. The final rule 
does not adopt this approach. To the extent practicable, an objective 
of this rulemaking is to reduce the need for exceptions and paperwork. 
In this case, the existing mine ventilation plan process provides a 
ready-made mechanism for establishing the precautions necessary, on a 
mine-by-mine basis, to protect miners from the hazards of spontaneous 
combustion in a timely manner. In addition, under the final rule, 
miners representatives are afforded input into the mine ventilation 
plan.
    Another commenter stated that paragraph (f) should be directed more 
to the detection and control of spontaneous combustion and not solely 
at its prevention. The commenter offered examples of detection and 
control techniques that could be used.
    MSHA agrees that spontaneous combustion prevention, detection and 
control are all important when dealing with spontaneous combustion. The 
final rule recognizes, however, that while prevention is the goal, 
instances of spontaneous combustion will occur.
    Another commenter stated that the preamble to the proposal was not 
correct in that it implied a need to limit airflow to avoid spontaneous 
combustion. The commenter states that, to avoid spontaneous combustion, 
miners must create a near-zero pressure differential across most areas 
of concern. MSHA agrees that creating a ``near-zero pressure 
differential'' will have the desired effect of limiting the airflow. In 
a paper entitled ``Examination of Bleederless Ventilation Practices for 
Spontaneous Combustion Control in U. S. Coal Mines'' presented at the 
7th U.S. Mine Ventilation Symposium in June 1995, the authors report 
that their study revealed that restricting airflow into mined-out areas 
is recognized world-wide as a spontaneous combustion control measure 
and that when designing a bleederless ventilation system critical 
attention must be given to mine layout, seal construction, methane 
drainage, regulations, monitoring, and emergency procedures. In 
discussing the subject of air leakage, Koenning in a paper entitled 
``Spontaneous Combustion in Coal 

[[Page 9786]]
Mines'' presented at the 4th U.S. Mine Ventilation Symposium in June 
1989, identified air leakage as the most often cited cause of 
spontaneous combustion. In both of these papers, the authors emphasize 
the need to properly design a bleederless ventilation system to reduce 
the likelihood of spontaneous combustion and achieve the level of 
worker safety desired. MSHA agrees with these authors that a 
bleederless ventilation system must be designed to encompass all of the 
factors identified. It was suggested by one commenter that measurement 
of carbon dioxide should be included in the requirements of paragraph 
(f). In discussing the gases required to be measured (methane, oxygen, 
and carbon monoxide), the commenter stated that these gases alone will 
not aid in the detection of spontaneous combustion in its incipient or 
developed stage. The commenter suggested that miners be required to 
monitor for carbon dioxide because, in the opinion of the commenter, 
the trend in the ratio CO/CO2 is the only viable predictor.
    MSHA sees merit in the measurement of carbon dioxide as well as 
other products of combustion to assist in the detection of spontaneous 
combustion. However, the ratio CO/CO2 is not the only viable 
predictor of spontaneous combustion. One researcher suggested that 
carbon monoxide production is the earliest, detectable effect of 
spontaneous heating. Others have suggested, following a series of 
tests, that four gas ratios clearly indicated the development of 
thermal runaway, but only the CO2- O2 ratio gave an 
early warning of the heating in the coalbed.
    As can be seen, a number of methods of predicting the onset of 
spontaneous combustion have been suggested. While paragraph (f)(1) 
requires only the measurement of methane, oxygen, and carbon monoxide, 
MSHA would not discourage operators from incorporating, as part of the 
mine ventilation plan, any or all of these methods as well as other 
appropriate methods to aid in the early detection of spontaneous 
combustion.

Section 75.340  Underground Electrical Installations

    Electrical installations can provide an ignition source for methane 
and can represent a serious fire hazard underground. Typical electrical 
installations are battery charging stations, substations, rectifiers 
and certain water pumps. Section 75.340 requires that these 
installations be ventilated and protected against fire. These 
installations must also be housed in noncombustible structures or areas 
or protected with fire suppressions systems, and be ventilated or 
monitored to protect miners working down stream from the products of 
combustion.
    MSHA proposed to revise paragraph (a) of existing Sec. 75.340 to 
clarify the standard and to add requirements concerning alarms and 
sensors. The final rule adopts the language in the proposal with one 
modification. It replaces the word ``located'' with the word 
``housed.''
    Existing 75.340(a) requires that certain underground electrical 
equipment be either located in a noncombustible structure or area or 
equipped with a fire suppression system. Section 75.340 (a) also 
requires that the equipment be ventilated by intake air, and lists 
alternatives ways to do so in paragraphs (a)(1),(a)(2), and (a)(3). The 
final rule adds language to paragraph (a)(3), the alternative which 
establishes an acceptable means for monitoring the underground 
electrical installations using sensors other than a Sec. 75.351 
atmospheric monitoring system.
    MSHA sought in the proposal to clarify the application of existing 
Sec. 75.340(a)(3). Paragraph (a)(3) of the existing rule provides for 
the activation of doors upon the presence of certain indications of a 
possible fire. The paragraph was appropriate for enclosed structures or 
areas; but questions at informational meetings challenged its 
applicability to the alternative where a fire suppression system was 
used without an enclosure. To address the questions, the proposal 
placed the requirements for noncombustible structures or areas and for 
fire suppression systems into separate paragraphs. MSHA proposed that 
one of the alternatives for ventilating with intake air (monitoring the 
underground electrical installations using sensors other than a 
Sec. 75.351 atmospheric monitoring system) was acceptable only if the 
equipment was located in a noncombustible structure or area and not 
acceptable if only a fire suppression system was used. This revision 
eliminates the confusion that existed with the existing rule. It should 
be noted that if an operator elects to locate this equipment in a 
noncombustible structure or area, the operator would not be precluded 
from also installing a fire suppression system.
    One commenter questioned the reason for separating fire suppression 
and noncombustible structures, noting that there was no need for the 
distinction in the rule. In objecting to the proposal, the commenter 
stated that there should be several cumulative layers of protection, 
including both fireproof enclosures and fire suppression systems. The 
commenter includes several examples of fires involving compressors to 
illustrate this point. MSHA has addressed concerns relative to 
compressor fires in the final rule section dealing with compressors, 
Sec. 75.344. Other examples cited by the commenter included explosions 
caused by mobile equipment and a fire that occurred on a power center 
located at the working section. The instances cited by the commenter 
are not relevant to Sec. 75.340. The commenter argued that fire 
suppression systems have not worked and uses the compressor fires 
previously mentioned to illustrate the point. MSHA notes that there are 
numerous instances where the systems have worked. However, in the vast 
majority of these cases there is no documentation because there is no 
requirement for reporting fires that are extinguished within 30 
minutes.
    The final rule in paragraph (a)(1)(iii) revises existing paragraph 
(a)(3) of Sec. 75.340 by adding 2 requirements. It adds a requirement 
that a visual and audible alarm be provided on installations if the 
(a)(1)(iii) alternative is selected. Also, when operating under this 
alternative, monitoring of intake air that ventilates battery charging 
stations must be done with sensors not affected by hydrogen.
    Some commenters noted their agreement with these proposed changes. 
Noting that no single system is failsafe, one commenter suggested that 
all the requirements of Sec. 75.340 be combined and made applicable in 
all cases. The requirements would include; noncombustible structures, 
fire suppression, ventilation directly to the return, additional 
communications, continuous AMS monitoring for carbon monoxide, methane, 
and hydrogen, along with automatic closing doors and temperature 
protection. After consideration of the comments and the underlying 
rationale, MSHA concludes that to require that the alternatives be 
applied cumulatively in every case would be infeasible or impractical. 
In addition, MSHA does not believe that these overly restrictive 
requirements are necessary in all circumstances.
    Paragraph (a)(1)(iii) addresses electrical installations that are 
equipped with doors that automatically close when sensor readings reach 
certain levels. One of these action levels is a level for the optical 
density of smoke. In Sec. 75.340 (a)(1)(iii)(B) of the proposal and the 
preamble discussion on page 26371, MSHA refers to the optical density 
of smoke of 0.05 per meter to characterize the sensitivity of smoke 
detectors. As discussed in MSHA's opening statement to the ventilation 
rulemaking hearings, 

[[Page 9787]]
the value used for the optical density of smoke is based on information 
provided from the Bureau of Mines. MSHA pointed out that based on 
comments received from the Bureau of Mines, this number is incorrect 
and should be divided by 2.303 to conform to the internationally 
accepted term of optical density. No commenter took issue with this 
point. MSHA has made the correction in the final rule. One commenter 
suggested that optical densities be increased and based on an ambient 
to account for background dust. In contrast, another commenter 
suggested that the specified optical density should be reduced by half. 
MSHA has found insufficient justification to adopt either of these 
suggestions and believes that the specified 0.05, corrected to 0.022 
based on comments from the Bureau of Mines, is the appropriate level 
for optical density used in Sec. 75.340. Existing Sec. 75.351 
Atmospheric monitoring system (AMS), uses a level for optical density 
of smoke of 0.05 per meter. MSHA recognizes that the level in 
Sec. 75.351 should also be corrected. MSHA intends to correct the level 
for optical density used in Sec. 75.351 in a future rulemaking. In the 
meantime, MSHA will use an optical density of 0.022 per meter for 
purposes of Sec. 75.340.
    The visual and audible alarm required in paragraph (a)(1)(iii) must 
be situated so that it can be seen or heard by persons traveling in the 
intake entry immediately adjacent to the installation. It was suggested 
to MSHA that these electrical installations may be susceptible to fire 
and the fire could go undetected. The visual and audible alarms would 
provide additional safety at these installations by alerting miners in 
the area.
    One commenter suggested that an alternative should be added to 
carbon monoxide or smoke detection. The suggested alternative would be 
to permit another means that would be approved by the district manager. 
This suggestion has not been adopted since both carbon monoxide 
monitoring and smoke detection have been shown to be effective and 
reliable and can be used.
    One commenter stated that battery chargers located on working 
sections do not present the same hazards as those located outby, along 
the intake. The commenter suggested that chargers located on working 
sections should be exempted from Sec. 75.340. MSHA disagrees. MSHA 
believes that battery chargers present the same safety hazards 
associated with other electrical equipment plus the charging of 
batteries results in the liberation of hydrogen. There is a 
demonstrated history of fires caused by battery chargers. The 
requirements are necessary to safely operate chargers, regardless of 
the location of the charger.
    One commenter suggested that all water pumps should be exempted 
from Sec. 75.340 because fire history is limited. The standard already 
exempts pumps that have limited fire hazard potential in paragraphs 
(b)(2) through (b)(6). Pumps outside of the listed categories do 
present hazards. As an example, a 200 horsepower pump exploded at a 
mine in Virginia after an extended period of being overheated. An 
example of a pump posing a limited hazard is an emulsion pump located 
at or near the section that is moved as the section advances or 
retreats. Emulsion pumps are considered for the purpose of Sec. 75.340 
to be water pumps.
    Also, one commenter called attention to MSHA's omission of the word 
``or'' in two places in Sec. 75.340, Underground Electrical 
Installations. MSHA agrees that the omission was inadvertent and so 
stated in its opening statement at the ventilation hearings. In 
Sec. 75.340, the word ``or'' has been inserted between paragraphs 
(a)(1) (i) and (ii) dealing with alternative ventilation requirements 
for noncombustible structures or areas and between paragraphs 
(a)(1)(iii) (A) and (B) setting out criteria that would govern the 
activation of automatic closing doors.
    Another commenter suggested that the signal from the visual and 
audible alarms required by existing paragraph (a)(3) should be sent to 
a surface location at the mine rather than being located outside the 
installation. The commenter supported the suggestion by indicating that 
a quicker response would thus be provided since the alarm would be 
immediately noticed. In order to achieve an effective level of safety, 
MSHA has provided in paragraph (a)(1)(iii) that the visual and audible 
alarm be located outside of and on the intake side of the enclosure. 
This location will permit persons traveling in the intake entry 
immediately adjacent to the installation to see or hear the alarm. 
Paragraph (a)(2) allows the use of an alternative system using an AMS 
which would provide an alarm at the surface of the mine.
    Finally, one commenter objected to the use of the word ``located'' 
in the phrase ``located in noncombustible structures or areas''. The 
commenter argued that MSHA should use the word ``housed'' and that the 
use of the word ``located'' actually reduces the protection intended by 
Congress. MSHA does not agree with that interpretation and maintains 
that in the context in which the word is used there is no meaningful 
distinction between the two words. However, because the word suggested 
by the commenter will not reduce safety and may add to the clarity of 
the rule for some readers, it has been adopted in the final rule.

Section 75.342  Methane Monitors

    Methane monitors are a critical link in the safety protections 
designed to prevent mine explosions. Mounted on mining equipment which 
works directly in the face, these instruments provide the first warning 
that gas is being liberated in potentially dangerous quantities. 
Methane monitors are relied upon to shut down mining equipment 
automatically when gas concentrations reach 2 percent. The continued 
operation of mining equipment under these conditions can lead to a 
spark and catastrophic explosion.
    The final rule revises paragraph (a)(4) which addresses maintenance 
and calibration of methane monitors that are required on underground 
mining equipment to provide a warning to equipment operators when the 
methane concentrations nears dangerous levels. Methane monitors also 
automatically deenergize the equipment when methane approaches the 
explosive range or if the monitor is not operating properly. The rule 
requires that trained persons perform maintenance and calibration of 
the methane monitors at least every 31 days and requires that 
calibration records be maintained. The final rule does not adopt the 
proposal which would have required that a written maintenance program 
be available for inspection.
    Some commenters expressed the view that the proposed revisions were 
unnecessary and recommended that they be deleted from the final rule. 
Other commenters supported the proposed revisions and urged MSHA to 
adopt additional requirements as well.
    Paragraph (a)(4) of the final rule requires that calibration and 
maintenance of the monitors be performed by persons properly trained in 
maintenance, calibration, and permissibility of the methane monitors. 
One commenter expressed the view that no change was needed to the 
existing rule. However, the rulemaking record also contains a number of 
examples in which poorly maintained or improperly repaired methane 
monitors have been found during the investigations of methane related 
accidents.
    The final rule in paragraph (a)(4)(ii) requires that each operator 
maintain a record of all calibration tests of methane monitors. As with 
other recordkeeping requirements under the final rule, records must be 
maintained in a secure 

[[Page 9788]]
book that is not susceptible to alteration, or may be kept 
electronically in a computer system so as to be secure and not 
susceptible to alteration. Some commenters recommended that a record be 
kept of all maintenance performed on a methane monitor, urging that a 
record is necessary to prove the maintenance is done. MSHA believes 
that the revisions contained in the final rule, together with the 
existing requirements, will assure an appropriate level of maintenance 
without the need for additional records of maintenance.
    Some commenters expressed concern over the security of computer-
based records, and offered examples of breaches of security in the 
banking and national security fields. Others, however, advocated the 
use of computers for the storage and retrieval of records as being 
highly accurate, requiring less storage space and facilitating data 
retrieval. MSHA agrees that security of required records is important. 
It is also MSHA's objective to make the final rule requirements for 
compilation and storage of records practical and in concert with modern 
methods. To this end, the final rule requires that the record of 
maintenance and calibration of methane monitors be maintained in secure 
books that are not susceptible to alteration, and also permits these 
records to be maintained electronically in a computer system so as to 
be secure and not susceptible to alteration. The calibration record 
will aid operators in tracking calibration activity and will serve as a 
check to assure that calibrations are being conducted at least once 
every 31 days. The record will also be reviewed by authorized 
representatives of the Secretary and miners' representatives to 
determine that calibrations are being conducted as required.
    Paragraph (a)(4)(iii) of the final rule requires that operators 
retain the record of calibration tests for 1 year from the date of the 
test. Records are to be maintained at a surface location at the mine 
and made available for inspection by authorized representatives of the 
Secretary and the representative of miners. A discussion of comments 
concerning the use of computers to maintain records can be found in the 
General Discussion of this preamble.
    Several commenters suggested that equipment not operated in the 
face area also be equipped with methane monitors. Commenters noted 
accidents which have occurred when this nonpermissible equipment has 
ignited methane in outby areas. Commenters also asserted that equipment 
used for the withdrawal of personnel during fan stoppages would be 
safer if methane monitors were provided. An opposing comment indicated 
that an expansion of the methane monitor coverage was not necessary 
since methane is rarely associated with outby areas. Because of the 
response time of methane monitors, and considering the speed at which 
most outby equipment normally operates, it is unlikely that a monitor 
would prevent a machine from entering a body of methane if such a 
concentration were encountered. MSHA believes that methane monitors are 
suitable and effective in face areas where coal is being cut, mined, or 
loaded. However, MSHA does not believe that an expansion of coverage to 
include all nonpermissible equipment is warranted.
    A number of commenters recommended that methane monitors should be 
calibrated at least every 7 days rather than at least every 31 days as 
provided by the existing standard. One commenter suggested daily 
calibration. Commenters noted that methane monitors lose sensitivity 
and that response time increases with monitor age and after exposures 
to elevated methane concentrations. The existing requirement for 
calibration of methane monitors at least every 31 days parallels the 
recommendations of several manufacturers. The 31 day requirement 
establishes a maximum time interval between calibrations. However, the 
final rule also requires the operator to maintain methane monitors in 
permissible and proper operating condition. Thus, under unusual 
circumstances of use, it is possible that weekly or even more frequent 
calibration may be necessary to comply with the standard.
    Comment was also received recommending an additional requirement 
that calibration records be countersigned by the Maintenance Supervisor 
or Chief Electrician at the mine. The final rule does not adopt this 
recommendation. The purpose of the calibration record required under 
the final rule is not the same as other records where countersigning is 
required by the final rule. Countersigning requirements are directed at 
informing upper mine management of hazardous conditions which require 
their attention. While the calibration record has the potential to 
assist mine management in identifying equipment problems, its main 
function is to assist operators in assuring that timely calibration is 
occurring.
    The proposal would have required that operators adopt a written 
maintenance program for methane monitors. Commenters pointed out that 
the existing standard already requires all permissible equipment, 
including methane monitors, to be maintained in permissible condition. 
MSHA agrees.

Section 75.344  Compressors

    Section 75.344 deals with the use of air compressors underground. 
As discussed in the introductory section of this preamble, MSHA stayed 
Sec. 75.344(a) because of a concern over a possible overheating or fire 
hazard. Improperly used or maintained air compressors can present a 
significant risk of fire underground. MSHA determined that the cause of 
the 1984 fire at the Wilberg Mine that claimed the lives of 27 miners 
was an improperly maintained compressor. In general, Sec. 75.344 
requires that most compressors be operated only while attended or 
located in a noncombustible structure or area that is monitored for 
temperature and carbon monoxide or smoke; have a fire suppression 
system; and, automatically shut down in the event of a fire.
    The final rule revises the existing Sec. 75.344, including the 
stayed paragraph (a), and supersedes interim Sec. 75.345. The final 
rule recognizes that in some cases compliance with the existing rule 
could result in heat buildup when a compressor is located in a 
noncombustible structure or area. To address this possible hazard the 
final rule provides an option. A compressor would be acceptable when 
not located in a noncombustible structure or area provided it is 
continuously attended by someone who can see the compressor at all 
times, activate the fire suppression system and shut off the 
compressor. Also, the existing rule is modified for compressors that 
are located in a noncombustible structure or area. They must be 
ventilated by intake air coursed directly into a return air course or 
to the surface and equipped with sensors to monitor for heat and for 
carbon monoxide or smoke. In addition, upon the activation of the fire 
suppression system, the compressor must automatically deenergize or 
shut off.
    The final rule does not include proposed paragraph (b)(2) which 
provided an additional alternative means of ventilating compressor 
installations located away from working sections and near a return air 
course where a substantial pressure differential exists.
    Comments were solicited on the exemption for compressors having a 
certain maximum horsepower. Comments were received both supporting and 
opposing a possible revision to increase the limit from 5 to 30 
horsepower. Because of the history of compressor fires, including the 
1984 Wilberg mine disaster which resulted in 

[[Page 9789]]
27 fatalities, the existing limitation of 5 horsepower has not been 
revised. One commenter questioned the proposal reference to 9 mine 
fires which started in compressors between 1970 and 1992. The commenter 
suggested that the nine fires was inaccurately low and referenced an 
MSHA report which stated that 21 compressor fires occurred between 1977 
and 1987. The preamble discussion addressing the number of fires was in 
relation to underground coal mines. Other compressor fires have 
occurred at surface coal mines and at noncoal mines. Regardless of the 
number of compressors affected, however, the safety concerns remain the 
same.
    Several commenters suggested that the cutoff for application of 
Sec. 75.344 be changed from 5 horsepower for all compressors to 30 
horsepower for reciprocating compressors and 5 horsepower for all other 
types of compressors. The rationale for this recommendation was that 
reciprocating compressors of up to 30 horsepower contain about the same 
amount of lubricating oil as 5 horsepower compressors. This suggestion 
was not included in the proposal, based on MSHA information (Report No. 
06-292-87 of the Industrial Safety Division, Pittsburgh Safety and 
Health Technology Center) that the predominant hazard for fire or 
explosion in reciprocating compressors is not the lubricating oil, but 
rather the formation of carbonaceous deposits in the discharge system. 
MSHA received comments addressing the formation of carbonaceous 
deposits in the discharge system indicating that the use of synthetic 
oil prevents any carbonaceous accumulation. Commenters suggested that 
all identified hazards would be eliminated through the use of synthetic 
oils. However, commenters also noted that synthetic oils have a higher 
flash point.
    MSHA has examined the subject of synthetic oils and found that 
synthetic oils can be formulated with polyalphaolefins, polyglycols, 
silicones, esters, phosphate-esters, and di-esters as the primary 
ingredient. These compounds are also blended with mineral oils to form 
synthetic lubricants. The rate of oxidation is varied among these 
compounds. Of these types, only silicone based lubricants exhibit 
virtually no oxidation and are used primarily where extremely high 
temperatures are expected. Also, silicone based lubricants are 
inherently fire resistant. Unfortunately, silicone based lubricants are 
incompatible with reciprocating compressors and will rapidly lead to 
failure of the compressor. Polyalphaolefins, polyglycols, and mineral 
oil blends all contain hydrocarbons and have a tendency to varnish and 
create deposits in air compressors. Accordingly, the final rule, like 
the existing rule, exempts compressors of five horsepower or less and 
the suggested revision to 30 horsepower has not been adopted.
    One commenter stated that modern compressor technologies allow for 
much safer rotary screw compressor operation using non-defeatable 
programmed safety controls, synthetic lubricants, automatic fire 
suppression and shutdown, and other precautions. Although synthetic 
lubricants offer some safety enhancement, they do not fully mitigate 
the hazards. Also, considering the accident history including the 
Wilberg disaster, MSHA has not provided an exemption for rotary screw 
compressors.
    Existing Sec. 75.344 (a)(1) requires all compressors to be located 
in noncombustible structures or areas and to be equipped with a heat-
activated fire suppression system. During informational meetings it was 
brought to MSHA's attention that in some instances requiring 
compressors to be inside such a structure could present a hazard 
through compressor overheating. Upon reviewing this potential effect of 
the regulation, MSHA agreed. Therefore, before the existing standard 
could become effective, MSHA stayed the application of paragraph (a)(1) 
and included the standard in this rulemaking.
    The final rule addresses the potential of compressor overheating by 
allowing a compliance alternative to enclosing the compressor. Heat is 
generated at considerable rates by operating compressors. Improperly 
used or maintained compressors can present a significant risk of fire. 
To minimize this hazard, the rule specifies other installation and 
operational requirements as well as providing for fire detection and 
fire suppression. As recommended by commenters, the final rule also 
provides for audible and visual alarms and automatic deenergization or 
shut-off.
    Several commenters discussed the proposed revisions to paragraph 
(a). One commenter urged that the term ``operation'' be clarified, 
noting that compressors which are designed to automatically start when 
necessary to rebuild air pressure should be protected. MSHA considers 
compressors that are installed to automatically start when necessary to 
rebuild air pressure to be in operation. MSHA agrees that these 
compressors should be provided either a noncombustible structure (or 
area) or an attendant. Accordingly, for the purpose of clarifying the 
requirement, the final rule includes the commenter's recommendations. 
Compressors which have been disconnected from the power or fuel source 
would not be subject to the requirement under the final rule.
    Another commenter suggested that the person specified in paragraph 
(a)(1) be trained. The commenter noted that the attendant would be of 
little value if unaware of the appropriate response to a fire. The 
commenter suggested that the person know how to deenergize the machine 
and activate the fire suppression system manually. MSHA agrees and 
notes that this knowledge is required under the proposal by requiring 
that the attendant be capable of performing these tasks. MSHA believes 
that any training necessary to meet this capability is implicit in the 
standard and the proposal has been retained under the final rule.
    Another commenter suggested that an attendant be accepted as an 
alternative to noncombustible structures or areas for a maximum of 8 
hours. The commenter stated that 8 hours would provide sufficient time 
for urgent roof bolting or construction work such as coating stoppings 
or powering a jack hammer. After considering the comment, the suggested 
time limit has not been adopted. MSHA believes that a continuous 
attendant, always within sight of the compressor and capable of 
responding as required, provides a level of protection equivalent to 
the protection provided by an enclosure. Therefore, the final rule 
allows either alternative to be selected. It should also be noted that 
the final rule has been revised to require either a continuous 
attendant or containment in a noncombustible enclosure or area.
    One commenter suggested that an alternative be provided in the rule 
to allow for video monitoring of compressors as an alternative to 
attendance or noncombustible enclosures. MSHA has not adopted the 
suggestion since video monitoring would not provide an equivalent level 
of safety compared to either an enclosure or attendance. There would be 
a considerable time delay in responding to a video monitor as compared 
to a nearby attendant who could immediately shut down the compressor, 
activate fire suppression, discharge fire extinguishers, apply rock 
dust, and take other necessary actions.
    Other commenters addressed an allowable distance within which the 
compressor attendant must remain. In the preamble to the proposal, MSHA 
solicited comments on the proposed language, ``can see the compressor 
at all times'' versus having the attendant 

[[Page 9790]]
remain within some specified distance. Rationale was solicited for any 
specific distances suggested. Several commenters supported the 
proposal, noting that adjustment is inherently provided for high mining 
heights and seam undulations since a low undulating seam would cause 
the attendant to remain closer to the compressor. Another commenter 
suggested that a maximum distance of 20 feet be specified. The 
commenter reasoned that a maximum distance of 20 feet would assure that 
the attendant could react to a fire quickly, noting that a compressor 
fire would propagate rapidly. The commenter also voiced a concern over 
travel time in low height mines and noted that distances over 20 feet 
might allow a fire to get out of control before the attendant could 
reach the machine.
    Another commenter was concerned with the proposed requirement in 
(a)(1) that a person be able to see the compressor at all times. The 
commenter suggested that the term ``close proximity'' be adopted noting 
that a person could be in close proximity, e.g. in an adjacent 
crosscut, but not within sight. The commenter suggested that this 
should be acceptable since the person would still be able to activate 
the fire suppression system. MSHA disagrees. The suggested situation is 
not acceptable since a considerable delay could result before detection 
of a problem if the person were not within sight of the compressor. In 
such a case the person would be relying on the smell of smoke or some 
indirect means of detecting a problem. Because of the potential fire 
hazard associated with compressors, reaction time is critical. MSHA 
continues to believe that reaction time is appropriately minimized if 
the assigned person can see the compressor at all times, is capable of 
deenergizing the unit, and is capable of activating the fire 
suppression system. While agreeing that reaction time is critical and 
after considering all of the comments, MSHA finds the arguments for not 
specifying a set distance to be more persuasive. Therefore, the final 
rule permits compressors to be continuously attended by a person 
designated by the operator who can see the compressor at all times 
during its operation. Any designated person attending the compressor 
must be capable of activating the fire suppression system and 
deenergizing or shutting-off the compressor in the event of a fire.
    If a compressor is not enclosed in accordance with (a)(2), the 
compressor can be operated only while it can be seen by a person 
designated by the operator according to (a)(1). In adopting this 
approach, the proposed paragraph (a)(1) language was deleted. 
Commenters indicated confusion over the similarity of proposed 
paragraphs (a)(1) and (b)(1) of the existing rule. The final rule 
combines these two requirements in (a)(1). The final rule requires both 
that the person be able to see the compressor and be capable of 
activating the fire suppression system.
    Paragraph (a)(2) of the final rule requires that compressors, if 
installed in a noncombustible structure or area, be ventilated by 
intake air coursed directly into a return air course or to the surface 
and be equipped with sensors to monitor for heat and for carbon 
monoxide or smoke. MSHA expects that an air quantity sufficient to cool 
the compressor will be provided through the enclosure. The 
manufacturer's operation manuals for compressors often specify an air 
quantity or a maximum ambient temperature. The sensors required by 
paragraph (a)(2) must deenergize power to the compressor, activate a 
visual and audible alarm located outside of and on the intake side of 
the enclosure, and activate doors to automatically enclose the 
noncombustible structure or area when either of the conditions in 
paragraph (a)(2)(i) or (ii) occurs. The visual alarm should be situated 
so that it can be seen by persons traveling in the intake entry 
immediately adjacent to the enclosure. The sensors must also deenergize 
or shut-off the compressor in addition to closing the doors of the 
enclosure.
    Paragraph (a)(1)(ii) specifies that the sensors shall deenergize 
power to the compressor, activate a visual and audible alarm located 
outside of and on the intake side of the enclosure, and activate doors 
to automatically enclose the noncombustible structure or area when the 
carbon monoxide concentration reaches 10 parts per million above the 
ambient level for the area, or the optical density of smoke reaches 
0.05 per meter. These levels are the same as required by the existing 
rule. As discussed in MSHA's opening statement at the ventilation 
rulemaking hearings, the value used for the optical density of smoke is 
based on information provided from the Bureau of Mines. MSHA pointed 
out that, based on comments received from the Bureau of Mines, this 
number is incorrect and should be divided by 2.303 to conform to the 
internationally accepted term of optical density. MSHA's remarks were 
made in reference to the requirement in Sec. 75.340(a)(1)(iii)(B). The 
final rule also makes a conforming technical revision to 
Sec. 75.344(a)(2)(ii).
    Paragraph (e) of the final rule requires automatic deenergization 
or automatic shut off of the compressor if the fire suppression system 
of paragraph (b) is activated. A number of commenters suggested that 
compressors should have an automatic shutdown feature that deenergizes 
or shuts-off the compressor when the required fire suppression system 
is activated. MSHA agrees. MSHA recognizes that under Sec. 75.1107-4 
automatic deenergization is required if the automatic fire suppression 
system is activated on unattended electrically powered compressors.
    Proposed paragraph (b)(2) has been omitted from the final rule. The 
paragraph was intended to provide additional flexibility for compressor 
installations located away from working sections and near a return air 
course where a substantial pressure differential exists. No comments 
were received in support of the proposed standard, while a number of 
comments were received in opposition. Commenters objecting to the 
standard raised concerns about overheating and stated that the 
revisions were made unnecessary in view of modified paragraph (a). MSHA 
agrees. Historically, when compressors that are on fire continue to 
operate, they often released oil into the environment, thus increasing 
the severity of the fire. For this reason, MSHA believes that safety is 
best served by requiring compressors to be deenergized or shut-off when 
the fire suppression system is activated. Commenters recommended 
deenergization in (a)(2) of the final rule. MSHA agrees and has the 
included automatic deenergization in (a)(2). One commenter suggested 
that alarms be automatically given at the section and surface and that 
two-way communications be provided at each compressor installation. 
This recommendation has not been adopted since the rule provides the 
desired level of safety through venting to the return, automatic fire 
extinguishment and closure of doors, in addition to the alarms outside 
the enclosure.

Section 75.360  Preshift Examination

    The preshift examination is a critically important and fundamental 
safety practice in the industry. It is a primary means of determining 
the effectiveness of the mine's ventilation system and of detecting 
developing hazards, such as methane accumulations, water accumulations, 
and bad roof.
    A considerable number of comments were received representing a 
range of opinions on the changes MSHA proposed. After consideration of 
all comments received, the final rule 

[[Page 9791]]
adopts certain modifications and clarifications to the existing 
standard to increase the effectiveness of the preshift examination. The 
final rule removes paragraph (e), redesignates existing paragraphs (f) 
through (h) as (e) through (g), revises paragraphs (a), (b), and (f) 
and adds new paragraphs (b)(8) through (b)(10).
    Existing paragraph (a) is divided into paragraphs (a)(1)and (a)(2) 
in the final rule. Paragraph (a)(1) of the final rule contains the 
existing general requirement that preshift examinations are to be 
conducted by certified persons designated by the operator. Paragraph 
(a)(1) also modifies the existing and proposed language in response to 
comments, to provide for preshift examinations at 8-hour periods. 
Paragraph (a)(2) of the proposed rule would have allowed pumpers to 
conduct an examination in lieu of the preshift examination under 
certain conditions. The final rule adopts this approach with 2 changes. 
The final rule does not require the pumper to examine for noncompliance 
with mandatory safety and health standards that could result in a 
hazardous condition and does require that records be made and retained 
in accordance with Sec. 75.363.
    A number of commenters addressed the application of this standard 
at mines where extended, overlapping, or other novel working shifts are 
employed. MSHA agrees with commenters that evolution within the 
industry in shift scheduling has presented a number of questions and 
controversies regarding the standard which must be resolved to assure 
that proper preshift examinations are conducted within suitable time 
frames. Based on comments, the final rule adopts a modification to 
clarify and standardize the application of the preshift examination in 
recognition of the use of novel shifts while maintaining the protection 
of the existing standard.
    Underground working schedules of three 8-hour shifts per day were 
virtually standard when the previous rule was implemented. Currently a 
substantial number of mining operations have work shifts of more than 8 
hours. Other operations stagger or overlap shifts providing for 
continuous underground mining activities. Some mines that operate 
around the clock schedule persons to begin shifts at one-or two-hour 
intervals. In such cases, controversies and misunderstandings have 
developed regarding application of the current standard.
    Commenters suggested that preshift examinations should be conducted 
for distinct 8-hour periods. Under this scenario a preshift examination 
for an 8-hour period would be acceptable for the entire 8-hour period 
regardless of shift schedules. Other comments indicate that this 
suggested modification would be consistent with the original intent and 
language of section 303(d)(2) of the Mine Act, which provides that no 
person, other than certified persons designated to conduct the 
examination, is permitted to enter any underground area unless a 
preshift examination of such area has been made within 8 hours prior to 
their entering the area. A commenter stated that to allow preshifts at 
more than 8-hour periods reduces the protection envisioned by the 
drafters of the Mine Act. MSHA understands the concerns and the 
critical nature of the preshift examinations to monitor the constantly 
changing conditions underground and has revised the rule accordingly to 
provide for an examination at 8-hour intervals.
    Under the final rule, operators will establish the 8-hour periods 
for which preshift examinations will be conducted. Persons may enter or 
leave the mine, regardless of their shift schedule during any 
established period for which a preshift examination has been conducted. 
However, another preshift examination must be completed prior to the 
next 8-hour period if any persons, other than examiners, remain in the 
mine. As always, no person other than examiners may enter any 
underground area prior to the completion of a preshift examination.
    The final rule requires three preshift examinations where persons 
are underground for more than 16 hours per day. At mines with only one 
8-hour shift per day only one preshift examination per day would be 
required. Mines working 10-or 12- hour shifts would conduct preshift 
examinations for each 8-hour period during which persons are 
underground. MSHA agrees with comments that the original legislation of 
the Mine Act envisioned that preshift examinations would be conducted 
for each 8-hour interval that persons worked underground. Similar to 
the existing requirement, the final rule does not require examinations 
for designated 8-hour periods when no one goes underground.
    MSHA recognizes that the final rule may cause a limited number of 
mines to perform examinations that are not currently required. These 
affected mines do not operate 24 hours per day but work one or two 
shifts which exceed 8 hours. For example, the final rule requires two 
examinations per day at a mine operating one 12-hour shift per day. 
When a mine operates two 10-hour shifts per day the final rule requires 
three examinations per day. The Agency has concluded that, considering 
the speed at which underground conditions can change, a reasonable 
period must be identified after which another examination is necessary. 
It is not MSHA's intent that the preshift be a continuous examination 
without a beginning or an end. Rather if the mine uses regular shifts 
that are longer than 8 hours in length, the preshift examination is 
good for an entire 8-hour interval. Those persons who start their work 
shift later than the normal shift start time do not need an additional 
preshift examination during the remainder of the 8-hour period. 
However, a preshift will be required if they are to stay in the area 
past the end of the 8-hour period. However, in accordance with 
longstanding practice, unplanned short excursions past the 8-hour 
period that occur infrequently will be accepted without an additional 
preshift. For example, miners required to stay an additional short 
period of time, such as 15 minutes to complete a mechanical repair, or 
due to a mantrip delay, would not need an additional preshift. The rule 
simplifies and clarifies the application of the standard at mines 
employing creative shift scheduling.
    Comments were received suggesting that the regulation should 
stipulate 12:00 a.m., 8:00 a.m., and 4:00 p.m. as the beginning of the 
8-hour periods for which preshift examinations would be required. This 
suggestion has not been adopted. There is no safety or health benefit 
to be gained through prohibiting operators from adopting other 8-hour 
intervals, e.g., 10:00 p.m., 6:00 a.m., and 2:00 p.m. Also, the 
standard is not intended to prevent operators from establishing their 
own work times. For example, an operator may elect a starting time of 
11:00 a.m. for a weekend project provided the preshift is completed 
within the 3 hours prior to the beginning of the shift.
    A commenter suggested that the final rule not require a preshift 
examination for non-coal producing shifts, where persons are to work in 
the shaft, slope, drift, or on the immediate shaft or slope bottom 
area. Under the commenter's suggestion, only that area immediately 
surrounding the bottom would need to be examined. The rationale given 
for the suggested change is that it is intended to bring the standard 
into conformity with ``certain state regulatory programs''. MSHA is not 
aware of state regulatory programs which would necessitate a change in 
the language of the final rule. Additionally, because areas where 
persons are not scheduled to work or travel are not required to be 
examined under the final rule, the 

[[Page 9792]]
change is unnecessary. Therefore, the suggestion of the commenter has 
not been adopted.
    Paragraph (a)(2) of the final rule provides that preshift 
examinations of areas where pumpers are scheduled to work or travel are 
not required prior to the pumper entering the areas, if the pumper is a 
certified person and the pumper conducts the specified examinations. 
This standard recognizes that pumpers travel to remote areas of the 
mine to check on water levels and the status of pumps, making regular 
preshift examinations impractical. The examinations required by pumpers 
include an examination for hazardous conditions, tests for methane and 
oxygen deficiency, and a determination of whether the air is moving in 
its proper direction in the area where the pumper works or travels. The 
examination of the area must be completed before the pumper performs 
any other work. A record of all hazardous conditions found by the 
pumper must be made and retained in accordance with Sec. 75.363.
    One commenter objected to the proposal stating that areas where 
pumpers work or travel should be preshift examined. The commenter 
stated that the proposed revision would weaken the protections provided 
under the existing standard, and that the rule would indirectly require 
that pumpers be certified. The commenter noted that most pumpers are 
not certified to perform examinations, and that it would be 
inappropriate to require ``hourly employees'' to obtain such 
certifications. The commenter further suggested that the proposed 
revision could infringe on the traditional relationship between labor 
and management wherein only management is required to be certified. The 
final rule does not require that pumpers be certified. Rather the final 
rule provides an option for pumpers to perform examinations for 
themselves if they are certified. Otherwise, areas where pumpers are 
scheduled to travel must be preshift examined by a certified person.
    The final rule maintains the existing level of safety. A complete 
examination by a certified person is still required and the examination 
will be conducted closer to the time that work is performed in the 
area. As with other examination requirements, no one may accompany the 
pumper during the examination. It is important to note that the 
examination performed by the pumper under paragraph (a)(2) is not 
acceptable if other persons have been scheduled to enter the area. The 
pumper may only perform an examination in lieu of a preshift for 
himself or herself. If, however, after the beginning of the preshift 
examination, persons are assigned to enter the area, the pumper may 
perform a supplemental examination for other persons in accordance with 
Sec. 75.361, provided that the certified pumper is designated by the 
operator to conduct such examinations.
    Commenters asserted that pumpers cannot conduct quality 
examinations and effectively perform their normal work duties. Under a 
previous standard replaced in 1992, persons such as pumpers, who were 
required to enter idle or abandoned areas on a regular basis in the 
performance of their duties, and who were trained and qualified, were 
authorized to make examinations for methane, oxygen deficiency and 
other dangerous conditions for themselves. Under the final rule, either 
a preshift examination must be made in accordance with paragraph (a)(1) 
before a pumper enters an area, or certified pumpers must conduct an 
examination under paragraph (a)(2).
    One commenter cited a 1984 incident at the Greenwich No. 1 mine 
where three miners were killed in an explosion while entering an idle 
area to work on a pump. The commenter suggested that an effective 
preshift examination would have prevented the accident and suggests 
that both a preshift examination and examinations by qualified pumpers 
should be required. An adequate preshift examination or supplemental 
examination as specified in the final rule, would prevent a similar 
result. One of these two examinations is always required under the 
final rule before persons enter any such idle area.
    Also in addressing paragraph (a)(2), one commenter suggested that 
some certified persons who are pumpers may not conduct adequate 
examinations. According to the commenter, certified persons conducting 
examinations under paragraph (a)(2) cannot be expected to perform at 
the same level as preshift examiners conducting examinations under 
(a)(1). MSHA expects that all certified persons who are required to 
conduct examinations, including certified pumpers, will conduct the 
examinations in accordance with the standards.
    Another commenter suggested that persons performing other jobs, 
such as rock dusters, should be permitted to perform examinations for 
themselves. Pumpers, unlike most other miners except mine examiners, 
travel in remote areas of the mine and normally work alone. Persons 
performing work such as rock dusting, however, normally work in newer 
areas of the mine where mining has only recently been completed and 
normally work as a part of a crew. Therefore, MSHA does not consider 
the work assignments to be similar enough to merit the same 
consideration and has not included this recommendation in the final 
rule.
    As proposed, paragraph (a)(2) would have required that the 
certified pumper examine for noncompliance with mandatory safety or 
health standards that could result in a hazardous condition, test for 
methane and oxygen deficiency, and determine if the air is moving in 
its proper direction in the area to be worked or traveled by the 
pumper. A number of commenters recommended the deletion of the 
requirement that the certified pumper identify and record noncompliance 
with mandatory safety and health standards that could result in a 
hazardous condition. Commenters cited a number of objections: the 
requirement would detract from miner safety, would significantly and 
unnecessarily increase the burden on examiners, would diminish the 
quality of the examination, would require excessive judgment and 
discretion by the examiners, and require examiners to make predictions. 
After considering all submitted comments, MSHA concludes that these 
comments have merit and the final rule does not require certified 
pumpers to examine for violations of mandatory safety and health 
standards that could result in a hazardous condition.
    Under paragraph (a)(2), a record of all hazardous conditions found 
by the pumper must be kept in accordance with Sec. 75.363. One 
commenter objected in that all of the records resulting from a preshift 
examination would not be required of the pumper, such as the locations 
of air and methane measurements and the results of methane tests. The 
commenter suggested that the full preshift record should be produced 
just as if the examination were done according to paragraph (a)(1). In 
the case of the pumper-examined area, the records required under 
paragraph (a)(2) will assure that mine management is made aware of any 
condition which results in a hazardous condition and will facilitate 
corrective actions being taken. It is important to note that the pumper 
is conducting an examination in a limited area only for himself or 
herself. This is in contrast to the various areas addressed in 
paragraph (a)(1), where the examination is in anticipation of one or 
many other miners entering these areas usually on a regular basis, all 
of whom are relying on the examiner's findings. In these circumstances, 
it is important that a record is made which can be 

[[Page 9793]]
utilized to spot ongoing problems and trends.
    Paragraph (b) of the rule specifies the nature of the preshift 
examinations and the locations where a preshift examination is 
required. Proposed paragraph (b) would have required that the person 
conducting the preshift examination would examine for noncompliance 
with mandatory safety or health standards that could result in a 
hazardous condition. After considering all submitted comments, the 
final rule does not contain this requirement.
    A number of commenters recommended the deletion of the requirement 
to identify and record noncompliance with mandatory safety and health 
standards that could result in a hazardous condition. Various 
commenters stated that the proposed requirement: would distract the 
examiner from the most important aspects of the preshift examination; 
would require predictions; would be an unrealistic expectation; and/or 
is designed only to facilitate enforcement actions. Commenters also 
suggested that the proposal would result in a shift in the focus of 
preshift examination from true hazards to noncompliance.
    Other commenters objected that the proposed requirement to examine 
for noncompliance with mandatory safety or health standards that could 
result in a hazardous condition is so vague that it could detract from 
miner safety. One commenter suggested that the examiners would spend 
their time performing permissibility checks, torquing roof bolts, 
measuring roof bolt spacing, and similar tasks which represent a 
significant departure from the examiners traditional duties.
    Another commenter expressed the opinion that paragraph (b) should 
require that all violations of mandatory safety or health standards be 
recorded and it should not be limited to those that could result in 
hazardous conditions. Preshift examinations assess the overall safety 
conditions in the mine; assure that critical areas are properly 
ventilated; assure that the mine is safe to be entered by miners on the 
oncoming shift; identify hazards, whether violations or not, for the 
protection of miners; and through this identification facilitate 
correction of hazardous conditions.
    The preshift examination requirements in the final rule are 
intended to focus the attention of the examiner in critical areas. This 
approach is consistent with the fundamental purpose of preshift 
examinations which is to discover conditions that pose a hazard to 
miners. MSHA is persuaded that to require examiners to look for 
violations that might become a hazard could distract examiners from 
their primary duties. The final rule, therefore, does not adopt this 
aspect of the proposal.
    Paragraph (b)(1) of the final rule adopts the proposal and 
clarifies that preshift examinations are to include travelways in 
addition to roadways and track haulageways. During informational 
meetings, commenters indicated that the terms ``roadways'' and ``track 
haulageways'' are associated with areas where mobile powered equipment 
is operated. By including the term ``travelways,'' the rule clarifies 
that areas where persons are scheduled to travel on foot are to be 
included, since hazards may also develop in these areas.
    One commenter suggested t
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
hat the proposal would greatly increase 
the area that must be preshift examined, even though the requirement is 
limited to only those travelways where miners are scheduled to work or 
travel. This commenter suggested that in large mines many more areas 
than would actually be used by miners would have to be preshift 
examined. The premise of the preshift examination is that all areas 
where miners will work or travel be examined for hazards. The final 
rule change concerning ``travelways'' is intended only to clarify that, 
when miners are scheduled to use these areas, they must be preshift 
examined first. The final rule, therefore, does not expand the existing 
scope to the preshift examination requirements.
    The language of the existing paragraph (b)(1) referring to, ``* * * 
other areas where persons are scheduled to work or travel during the 
oncoming shift'' is transferred to a new paragraph (b)(10) with 
conforming changes, as proposed. MSHA received no comments on moving 
this provision to paragraph (b)(10). Commenters did respond to the 
phrase in proposed paragraph (b)(1) requiring preshift examinations of 
roadways, travelways and track haulageways where persons are ``* * * 
scheduled, prior to the beginning of the preshift examination to work 
or travel during the oncoming shift.'' The purpose of this proposal, 
which is adopted in the final rule with only clarifying changes, is to 
permit work and mining personnel to be rescheduled after the start of a 
shift. Preshift examinations, by their nature, must be completed before 
the start of the shift. Changes in conditions, however, such as a 
breakdown of equipment, can alter planned work schedules. To 
accommodate these circumstances, the final rule requires mine operators 
to design preshift examinations around the best information available 
at the time the preshift begins. If changes must be made, Sec. 75.361 
specifies that areas not preshift examined be covered by a supplemental 
examination performed by certified persons before miners enter the 
area.
    One commenter objected that was confusing and should be modified. 
Other commenters foresaw possible abuses of the flexibility offered by 
the rule with some operators performing supplemental rather than 
preshift examinations, claiming that assignments were made after the 
preshift examination begins. After considering the comments, MSHA has 
retained the proposed flexibility to preshift examine areas where 
miners are scheduled to work or travel. To require more than this would 
be impractical.
    Section 75.360(b)(3) of the final rule requires preshift 
examinations of working sections and areas where mechanized mining 
equipment is being installed or removed if anyone is scheduled to work 
on the section or in the area during the oncoming shift. A discussion 
of the reproposal of provisions concerning the installation and removal 
of mechanized mining equipment is presented in the General Discussion 
section of this preamble. As with the existing rule, the examination 
includes working places, approaches to worked-out areas, and 
ventilation controls on these sections or in these areas. The final 
rule, like the proposal, adds a new requirement that the examination 
also include a test of the roof, face and rib conditions on these 
sections or in these areas.
    Proposed changes to paragraph (b)(3) not adopted in the final rule 
would have also required preshift examination of sections not scheduled 
to operate but capable of producing coal by simply energizing the 
equipment on the section. Also, proposed changes to paragraphs (c), 
(c)(1), and (c)(3) specifying where air volume measurements were to be 
taken on these sections have also not been adopted in the final rule.
    The new requirement to test the roof, face and rib conditions is 
added because of the importance of this test to the safety of miners. 
In newly mined areas, checking roof, face and rib stability is most 
important to preventing injuries and death. Comments were received in 
support of the revision, citing accidents which might have been 
prevented had such tests been adequately performed during preshift 
examinations. One commenter, when suggesting new wording for paragraph 
(b)(3), indicated that the requirement to test the roof, face and rib 
conditions should be deleted but 

[[Page 9794]]
did not offer any rationale for the suggested deletion. Another 
commenter suggested that the preshift examination should only require a 
visual examination of the roof, rather than a physical examination. 
Physical examinations of the roof, such as ``sounding,'' have been a 
historically accepted method for examiners to test roof competency. 
Whenever an examiner has a question as to whether a section of roof is 
competent, such a test should be performed.
    Comments were mixed on MSHA's proposed revision to include idle 
working sections as part of the preshift examination. The proposal is 
not retained in the final rule. Some commenters objected to the 
proposal as unnecessary, burdensome, or impractical. Commenters 
believed that the existing Sec. 75.361 requirement for supplemental 
examinations prior to anyone entering into such an area was sufficient. 
Commenters also stated that a preshift examination in these areas could 
introduce a false sense of security and that the effect would be to 
divert preshift examiners from more important duties. One commenter 
stated that the proposed requirement would be inconsistent with and 
contradictory to the basic concept of preshift examinations. Another 
commenter objected to MSHA's statement in the preamble to the proposal 
that there is a reasonable likelihood that miners will at some point 
during a working shift enter sections that are set up to mine coal.
    In support of the proposed requirement to preshift examine idle 
sections, one commenter cited explosions at the Red Ash Mine in 1973, 
the Scotia Mine in 1976, the P&P Mine in 1977, the Ferrell #17 in 1980, 
the Greenwich #1 Mine in 1984, and the 1994 explosion at the Day Branch 
No. 9 Mine in Kentucky. As the commenter pointed out, in each of these 
accidents miners were sent into an area that had not been preshift 
examined. However, none of these accidents were the result of miners 
entering areas that would have been covered by the proposal. In each 
instance, miners entered an area where mining had ceased, but could not 
be resumed by simply energizing equipment. Another common thread in 
each of these explosions was the failure of the operator to conduct the 
required supplemental examination prior to miners entering the area on 
an unscheduled basis.
    Paragraph (b)(4) of the final rule requires preshift examinations 
to include approaches to worked-out areas along intake air courses and 
at the entries used to carry air into worked-out areas if the intake 
air passing the approaches is used to ventilate working sections where 
anyone is scheduled to work during the oncoming shift. The examination 
of the approaches to the worked-out areas is to be made in the intake 
air course immediately inby and outby each entry used to carry air into 
the worked-out area. The examination of the entries used to carry air 
into the worked-out areas is to be at a point immediately inby the 
intersection of each entry with the intake air course. The standard is 
intended to assure that miners are not exposed to the hazards 
associated with ventilating working sections with contaminated air 
which has passed through a worked-out area. The requirement is 
consistent with the Sec. 75.301 definition of ``return air'' and with 
Sec. 75.332 which provides that working sections and other specified 
areas must be ventilated with intake air.
    Commenters correctly noted that a clarification was needed in the 
first sentence of proposed paragraph (b)(4) to indicate that the 
examination at the specified points is only required if the intake air 
passing the approaches is used to ventilate working sections where 
anyone is scheduled to work during the oncoming shift. Commenters 
suggested that an examination should not be required if the intake air 
is not used to ventilate working sections or if no one is scheduled to 
work on the section. This was the result intended by the proposal and 
the final rule has been revised accordingly.
    One commenter also suggested that the requirement in paragraph 
(b)(4) is unnecessary because the safeguards in the approved mine 
ventilation plan should prevent an air reversal in a worked-out area in 
which this air would enter the intake air course. The commenter offered 
the example of a worked-out area connected directly to a bleeder 
system. MSHA agrees that when proper safeguards are in place and 
operating as intended, air reversals are unlikely. However, roof falls 
and other obstructions in the worked-out area or in the bleeder can 
cause air reversals, permitting return air to enter the intake and be 
transported to the working section. Without a suitable examination, 
this condition would go undetected and could lead to disaster. While 
not exactly the same, the explosion at the Pyro Mine in 1989, which 
resulted in the deaths of 10 miners, was the result of a somewhat 
similar set of circumstances. A water blockage in the bleeder entry 
that combined with changes to certain ventilation controls led to 
methane migrating from the worked-out area onto the longwall face. 
MSHA's report of this accident concludes, in part, that changes that 
occurred during the mining of the longwall panel and in the bleeder 
entries caused a fragile balance of air flows to exist in the 
ventilation system that permitted methane to migrate from the gob and 
to accumulate near the longwall headgate.
    One commenter agreed with the proposal and discussed the need to 
assure that miners are not exposed to the hazards associated with 
ventilating working sections with return air.
    Essentially, the final rule requires that at each applicable 
approach, three examinations must be made; immediately inby and outby 
the approach in the intake entry and in the approach itself immediately 
inby the intersection with the intake entry. Situations exist where 
multiple openings along an intake lead into a worked-out area. Under 
some conditions intake air enters the upstream openings, passes through 
the worked-out area, and then re-enters the intake. The examination 
required by paragraph (b)(4) is designed to assure that such a 
condition is detected. Also, the examination detects any change in 
ventilation entering the worked-out area which may warrant follow-up or 
corrective actions to assure that the worked-out area is ventilated.
    Paragraph (b)(6) of the final rule adopts the proposal modifying 
the existing rule. No comments were received on this aspect of the 
proposal. The final rule in paragraph (b)(6)(i) requires preshift 
examinations to include entries and rooms developed after November 15, 
1992 (the effective date of the existing rule), and developed more than 
2 crosscuts off an intake air course without permanent ventilation 
controls where intake air passes through or by these entries or rooms 
to reach a working section where anyone is scheduled to work during the 
oncoming shift. Similarly, under (b)(6)(ii) the examination must 
include entries and rooms developed after November 15, 1992, and driven 
more than 20 feet off an intake air course without a crosscut and 
without permanent ventilation controls where intake air passes through 
or by these entries or rooms to reach a working section where anyone is 
scheduled to work during the oncoming shift.
    Existing paragraph (b)(6) requires that a preshift examination be 
made in all entries and rooms driven more than 20 feet off an intake 
air course without a crosscut or more than 2 crosscuts off an intake 
air course without permanent ventilation controls where intake air 
passes through or by these entries or rooms to a working section where 
anyone is scheduled to work during the oncoming shift. MSHA proposed 

[[Page 9795]]
modifications to existing paragraph (b)(6) based on concerns raised 
following publication of the existing rule on May 15, 1992. Commenters 
at that time indicated that extensive rehabilitation would be required 
at a number of mines to implement the standard in the rooms and entries 
described in the rule, causing diminished safety for miners performing 
the rehabilitation work. Commenters noted that some areas had been 
timbered heavily and cribbed because of adverse roof conditions and 
that rehabilitation would unnecessarily expose miners to roof falls and 
rib rolls while removing or repositioning roof support. In addition, 
roof conditions in some areas would remain hazardous even after 
rehabilitation. The commenters also noted that many such areas had been 
in existence for many years without incident and that any methane 
liberation had long since stopped due to the passage of time. They 
noted that some areas cannot be effectively sealed and that the risks 
associated with rehabilitation and subsequent physical examinations 
would greatly outweigh the safety benefit to be gained. MSHA recognizes 
the legitimate concerns raised by the commenters and the final rule 
requires preshift examination of entries and rooms developed after 
November 15, 1992 and driven more than 20 feet off an intake air course 
without a crosscut or more than 2 crosscuts off an intake air course 
without permanent ventilation controls where intake air passes through 
or by these entries or rooms to a working section where anyone is 
scheduled to work during the oncoming shift. MSHA believes, however, 
that the conditions addressed by paragraph (b)(6) are the result of 
improper mining practices in the past. These mining systems should be 
revised in the future to avoid poor conditions, or the areas affected 
should be fully and reliably ventilated and be examined. Also, the 
final rule applies only to entries and rooms developed after the 
effective date of the existing rule. As such, the mining industry was 
on notice of the shortcomings of mining practices that left entries and 
rooms of the type addressed by the standard.
    Paragraph (b)(8) retains the proposal requiring preshift 
examinations to include high spots along intake air courses where 
methane is likely to accumulate, if equipment may be operated in the 
area during the shift. As noted in the proposal, it has long been 
recognized that methane can accumulate in high areas with no 
indications being detected in the lower portions of the opening. As 
mobile equipment passes under these areas or a conveyor belt is put 
into operation, the methane is pulled down and mixed with the air in 
the entry and may be ignited. The final rule addresses the hazards of 
undetected accumulations of methane in high spots by requiring preshift 
examinations in such areas in intake air courses if equipment will be 
operated in the area during the shift.
    Several commenters requested that MSHA clarify the term ``high 
spots.'' One commenter stated that many hours would be necessary to 
examine every indentation in the roof of a large mine and stated the 
belief that the turbulence created by passing equipment would render 
harmless any of the small amounts of methane that might possibly 
accumulate. Another commenter believed the requirement was unnecessary 
because there has never been a problem with methane accumulating in 
intakes in quantities sufficient to cause an explosion. One commenter 
suggested that the requirement should only be applicable to mines with 
a demonstrated history of methane accumulations, noting that although 
mines are considered likely to liberate methane, it is not likely that 
all mines will accumulate methane in high spots.
    Another commenter suggested that preshift examinations should be 
required in all high spots in intakes, returns, belt entries, and track 
haulage entries. The commenter also objected to limiting the 
examination in intakes only to areas where equipment may be operated 
during the shift. The commenter observed that methane can accumulate 
quickly in high spots and that it is critical to detect the methane 
before it creates a danger. The commenter notes several accidents 
involving methane accumulations in high spots, including: Meigs No. 31 
Mine in 1993 where methane in a roof cavity was ignited by a torch; VP-
5 Mine in 1992 when methane in a cavity was ignited by a torch; Ferrell 
No. 17 Mine in 1980 where, according to the commenter, methane may have 
accumulated in a cavity in the belt entry roof and may have been 
ignited by a trolley powered vehicle; and in the VP-6 in 1982 where 
methane in a high spot was ignited by a trolley powered vehicle 
traveling through the area. The commenter stated that accumulations of 
methane in high spots can be ignited by any number of sources.
    A meaningful preshift examination requires that conditions which 
can lead to an explosion or ignition be detected and corrected before 
miners begin their work. In addition to the accidents cited above 
attributed to methane accumulations in high spots, the Itmann No. 3 
Mine explosion occurred when a trolley powered vehicle ignited methane 
in a high spot, resulting in the death of 5 miners and severe burns to 
2 other miners. The phrase ``high spots where methane is likely to 
accumulate'' should be understood in the coal mining industry. 
Experienced miners, and in particular preshift examiners and certified 
persons, can readily recognize a high spot where methane is likely to 
accumulate. Also, MSHA for many years has considered preshift 
examinations to be inadequate where examinations did not include 
methane tests in these areas. An examination of ``every indentation,'' 
as foreseen by one commenter is not expected nor intended by paragraph 
(b)(8), which specifies that preshift examinations be used to identify 
methane hazards by testing in the appropriate locations. The final rule 
does not adopt the suggestion that methane examinations be based on 
mine liberation history since significant methane liberation may begin 
or can greatly increase at any time. Also, the potential for a 
dangerous accumulation of methane in a high spot is influenced by mine 
ventilation, particularly the air velocity in the entry.
    One commenter suggested that the rule require tests only in 
``unventilated high spots'' along intake air courses. The final rule 
does not adopt this approach. The purpose of the preshift examination 
is to detect hazards, in this case accumulations of methane. Nominal 
ventilation in a high roof cavity may not be sufficient to sweep away 
methane and an accumulation could exist. The final rule directs an 
examiner's attention to such situations.
    Proposed paragraph (b)(9) is modified in the final rule. Paragraph 
(b)(9) of the final rule requires preshift examinations at underground 
electrical installations referred to in Sec. 75.340(a), except those 
water pumps listed in Sec. 75.340(b)(2) through (b)(6), and areas where 
compressors subject to Sec. 75.344 are installed if the electrical 
installation or compressor is or will be energized during the shift. 
The proposal would have exempted all water pumps from the requirements 
of paragraph (b)(9).
    One commenter objected to the exemption for pumps and recommended 
that all pumps be examined pointing out that some pumps are large, 
high-horsepower units. The commenter noted a 1994 case in Virginia 
where a 200 horsepower pump exploded. Pumps of this type may be in 
locations or in applications that would not be examined by pumpers 
under paragraph (a)(2). The final rule responds 

[[Page 9796]]
to this issue by requiring that all pumps should not be exempted from 
the standard. Paragraph (b)(9) requires preshift examinations of all 
pumps, except those specified in Sec. 75.340(b)(2) through (b)(6). 
Pumps specified in Sec. 75.340(b)(2) through (b)(6) and other pumps 
that operate automatically or that otherwise may be energized are 
generally in the more remote areas of the mine and are to be examined 
weekly in accordance with Sec. 75.364.
    Pumps which will be examined by certified pumpers in accordance 
with paragraph (a)(2) are not covered by the final rule because of the 
limited hazards they pose and because certified pumpers would 
themselves conduct examinations of this equipment in accordance with 
paragraph (a)(2). Examinations by pumpers at these locations will 
assure that methane has not accumulated and that the equipment is not 
in a condition to create a fire or ignition source.
    A review of the accident history reveals a number of fires in 
equipment that, under the final rule, would be subject to preshift 
examinations. For example, the compressor that MSHA identified as the 
probable cause of the fire in the Wilberg Mine, which killed 28 miners, 
would have required a preshift examination under (b)(9) of the final 
rule. Additionally, MSHA has identified several fires associated with 
rectifiers and transformer installations in the mining industry. One of 
these transformer fires was discovered during a preshift examination.
    One commenter supported proposed paragraph (b)(9) and noted a 
number of ignitions involving trolleys. The commenter also noted that 
history demonstrates that other electrical installations present 
ignition or fire hazards which should be examined before each shift.
    One commenter incorrectly understood proposed paragraph (b)(9) to 
not require preshift examinations of areas where compressors subject to 
Sec. 75.344 are installed if the compressor is or will be energized 
during the shift. The standard does require preshift examinations of 
such equipment, which includes all compressors except those which are 
components of equipment such as locomotives and rock dusting machines 
and are compressors of less than five horsepower.
    Paragraph (b)(10) adopts the proposal that preshift examinations 
include other areas where work or travel during the oncoming shift is 
scheduled prior to the beginning of the preshift examination. This 
provision recognizes that work requirements and situations may change 
after the preshift examination has begun. Often, once the examination 
has started it is not possible to contact the examiners to direct them 
to newly identified areas where miners will work. In these cases, a 
supplemental examination is required before persons work or travel in 
these areas. As discussed in the preamble to the proposal, paragraph 
(b)(1) requires preshift examinations of any underground area where 
persons are scheduled to work or travel during the oncoming shift. 
Under the existing rule, an operator did not have the flexibility to 
modify work assignments after the preshift examination had begun, 
unless it was possible to contact and redirect the examiners to perform 
a preshift examination before the beginning of the shift. Commenters in 
general supported the proposal. One commenter, however, while 
supporting the change expressed concern that the provision could be 
abused. MSHA does not anticipate abuse of the rule and believes it to 
be a reasonable approach to assuring that areas where persons work or 
travel are examined.
    As discussed above, the final rule does not adopt the proposed 
revisions to paragraphs (c), (c)(1), and (c)(3) and instead retains the 
language of the existing standard. While commenters to proposed 
paragraphs (c), (c)(1), and (c)(3) objected to expanding air volume 
measurements made during preshift examinations to sections where coal 
could be mined by simply energizing the equipment, no comments were 
received objecting to retaining the requirement for areas where 
equipment is being installed or removed. An in-depth discussion of the 
reproposal of provisions concerning the installation and removal of 
mechanized mining equipment is presented in the General Discussion 
section of this preamble.
    Paragraph (f) of the final rule sets out the requirements for 
recording and countersigning both the results of the preshift 
examination and actions taken to correct hazardous conditions found 
during the preshift examination. The final rule adopts the following 
proposed revisions to the existing rule: a record of the results of the 
preshift examination is required to be made; the results of methane 
tests are required to be made in terms of the percentage of methane 
found; and a certified person is required to record the actions taken 
to correct hazardous conditions found during the preshift examination.
    Additionally, paragraph (f) of the proposal would have required 
countersigning by both the mine foreman and the superintendent or 
equivalent individual to whom the mine foreman reports. The final rule 
does not require this second level countersigning. Also, the final rule 
allows an official equivalent to a mine foreman to sign the records. 
Finally, the final rule allows for secure storage of records in a way 
that is not susceptible to alteration and the records can be kept in a 
book or in a computer system.
    Commenters suggested that the final rule only require the examiner 
to record uncorrected hazardous conditions and not those which were 
corrected by the end of the shift. Commenters characterized the 
reporting of corrected hazardous conditions as unnecessary and 
unjustified by the accident history.
    MSHA did not adopt the proposal to record corrected defects found 
during the fan examination required by Sec. 75.312. MSHA believes, 
however, that a record of all hazards found during the preshift 
examination, including those corrected, is necessary. The record serves 
as a history of the types of conditions that are being experienced in 
the mine. When the records are properly completed and reviewed, mine 
operators can use them to determine if the same hazardous conditions 
are occurring repeatedly and if the corrective action being taken is 
effective. Additionally, this record can permit mine management, the 
representative of miners, and the representative of the Secretary to 
better focus their attention during examinations and inspections. The 
safety value of a complete record is illustrated by the 1989 explosion 
at Pyro Mining Company's William Station Mine in which 10 miners were 
killed. MSHA's accident investigation report concludes that methane 
concentrations of up to 6.5 percent were detected in the explosion area 
prior to the explosion but reports by the mine foreman for the shift 
failed to record the presence of these dangerous accumulations of 
methane or show the action taken to correct the condition. The 
investigation further found that the failure to record these methane 
accumulations in the appropriate record books prevented management 
officials and other interested persons from learning of the hazardous 
condition and initiating corrective action. In light of the record, the 
final rule adopts the proposal and requires the examiner to record the 
results, whether corrected or not, of the preshift examination and the 
action taken to correct hazardous conditions found during the preshift 
examination. This would include hazardous conditions and their 
locations and the results of methane and air measurements required to 
be made elsewhere in Sec. 75.360. 

[[Page 9797]]

    As with other records required by this rule, the records of 
preshift examinations may be kept either in secure books that are not 
susceptible to alteration or electronically in a computer system so as 
to be secure and not susceptible to alteration. A detailed discussion 
of record books and the use of computers to maintain records can be 
found in the General Discussion of this preamble.
    A variety of comments were received regarding the countersigning of 
preshift records by the mine foreman, and the time permitted for 
countersigning. The final rule adopts the proposal that the mine 
foreman or equivalent mine official must countersign the record of the 
preshift examination by the end of the mine foreman's next regularly 
scheduled working shift. The mine foreman is in a position of 
responsibility for the day-to-day operation of the mine. It is 
essential for the health and safety of the miners that the mine foreman 
be fully aware of the information contained in the preshift examination 
reports so as to be able to allocate resources to address safety 
problems. Allowing until the end of the mine foreman's next regularly 
scheduled working shift to countersign the reports provides sufficient 
flexibility to make compliance practical while assuring that the mine 
foreman is aware of the results of the examination in a reasonably 
timely manner.
    Some commenters suggested that the time for countersigning is 
unnecessarily long, and that the final rule should restore a previous 
requirement that countersigning be completed ``promptly.'' The term 
``promptly'' involves ambiguity that is eliminated by specifying the 
time for countersigning the preshift examination record. The rulemaking 
record does not show that the time set by the final rule would expose 
miners to safety or health risks. Commenters suggested that the term 
``mine foreman'' be replaced by a ``certified person responsible for 
ventilation of the mine or his designee.'' Another commenter suggested 
that the record could be countersigned by the mine foreman or any other 
mine official responsible for the day-to-day operation of the mine. 
Commenters stated that some operations no longer use the terms ``mine 
foreman,'' ``mine manager,'' or ``superintendent''. To provide for 
alternative management titles, the final rule incorporates the phrase 
``or equivalent mine official.''
    Numerous comments were received regarding the proposal for second 
level countersigning of the preshift examination record by the mine 
superintendent, mine manager, or other mine official to whom the mine 
foreman is directly accountable, within 2 scheduled production days 
after the countersigning by the mine foreman. The final rule does not 
retain this proposed requirement. A detailed discussion of the subject 
of second level countersigning can be found in the General Discussion 
section of this preamble.
    Paragraph (f) of the final rule also contains revisions to the 
existing rule to allow for electronic storage of records. Paragraph (g) 
requires that the records required by Sec. 75.360 be maintained at a 
surface location at the mine for one year and be made available for 
inspection by authorized representatives of the Secretary and the 
representatives of miners. A discussion of comments concerning the use 
of computers to maintain records can be found in the General Discussion 
of this preamble.

Section 75.362  On-Shift Examination

    Like the preshift examination, the on-shift examination of working 
sections is a long accepted safety practice in coal mining. As coal is 
extracted, conditions in the mine continually change and hazardous 
conditions can develop. Because the mining environment changes 
constantly during coal production, this examination identifies emerging 
hazards or verifies that hazards have not developed since the preshift 
examination. Generally, the on-shift examination includes tests for 
methane and oxygen deficiency, an examination for hazardous conditions, 
and air measurements at specified locations.
    The final rule adopts proposed Sec. 75.362 with the exception that 
revisions have been made to the proposed provisions dealing with an 
examination for compliance with the mine ventilation plan requirements 
for respirable dust control.
    The final rule redesignates existing (d)(1)(i) and (ii) as 
(d)(1)(ii) and (iii), revises paragraphs (a)(1), (c)(1), (d)(1)(iii) 
and (d)(2), removes paragraph (a)(2), and adds new paragraphs (a)(2) 
and (d)(1)(i). Additionally, the requirements of existing paragraphs 
(g) and (h), recordkeeping and retention, are transferred to 
Sec. 75.363, Hazardous conditions, posting, correcting, and recording. 
New paragraphs (g)(1) and (g)(2) are also added by the final rule.
    The word ``on-shift'' has been added to the first sentence of 
paragraph (a)(1) for clarity and consistency with other paragraphs of 
Sec. 75.362. MSHA did not receive any comments on this proposed 
revision. Paragraph (a)(1) is also revised as proposed to require a 
certified person designated by the operator to conduct an on-shift 
examination of each section where anyone is assigned to work during the 
shift and any area where mechanized mining equipment is being installed 
or removed during the shift. The existing rule required that an on-
shift examination be performed only on sections where coal is produced 
and areas where mechanized mining equipment is being installed or 
removed. Some commenters agreed that many of the same hazards exist on 
a section whether coal is being produced or not. Commenters gave 
several examples of activities that take place on non-coal producing 
sections including equipment repair and maintenance, cutting and 
welding, rockdusting, clean-up, and roof bolting. As indicated by these 
commenters, all of these activities present the potential for a serious 
accident. One commenter arguing against the proposed change stated that 
the preshift and supplemental examinations already address the safety 
concerns to which the proposal was directed. While MSHA considers the 
preshift and supplemental examinations to be of great importance in 
providing a safe work environment, these examinations are performed 
prior to workers on a shift entering the mine or, in the case of the 
supplemental examination, in an area of the mine that has not been 
preshift examined. The on- shift examination is intended to address 
hazards that develop during the shift. The concept of the on-shift 
examination is not new. On-shift examinations of coal producing 
sections have been required since the enactment of the Federal Coal 
Mine Health and Safety Act of 1969.
    Another commenter arguing against expanding the on-shift 
examination requirement to non-coal producing sections stated that 
requiring on-shift examinations of areas other than working sections 
would detract from other required examinations. On-shift examinations 
on coal producing sections are normally conducted by section foremen 
who spend the vast majority of the shift on the section they are 
supervising. These individuals will not normally conduct the on-shift 
examinations in non-coal producing sections. These examinations will be 
conducted by certified persons assigned to work in these areas or other 
certified persons assigned to conduct these examinations. MSHA does 
not, therefore, foresee reduced attention to examinations in working 
sections.
    Another commenter suggested that the requirements for on-shift 
examinations be expanded further than proposed. The commenter stated 
that many of the same types of activities that 

[[Page 9798]]
occur on non-production shifts on the sections also occur in outby 
areas of mines. In support of this recommendation the commenter pointed 
to 4 explosions which occurred in outby areas of the mines. Those 
accidents were the explosions at the Greenwich Collieries No. 1 Mine in 
Pennsylvania in February 1984 where 3 miners were killed; the explosion 
at the Day Branch Mine in Kentucky in 1994 where 2 miners lost their 
lives and; an ignition at the Loveridge No. 22 Mine in West Virginia in 
1992 that burned 1 miner. In each accident, several violations of 
safety standards contributed to the explosion or ignition, including 
inadequate or entirely omitted examinations required by standards in 
effect at the time. Compliance with those safety standards would have 
significantly reduced the likelihood of these tragic accidents 
occurring. Likewise, requirements of this final rule, such as the 
requirements for preshift and supplemental examinations in areas where 
persons are assigned to work or travel, would have served well to 
prevent these accidents.
    The final rule requirements for on-shift examinations focus on the 
areas most likely to develop hazards during a shift. Expanding the 
examination requirements further is not supported by the record nor 
needed for miner safety.
    As proposed, the final rule also revises paragraph (a)(1) to 
clarify that sufficient on-shift examinations must be conducted to 
assure safety. One commenter suggested that MSHA should include 
language to require more than one examination if necessary for safety, 
as provided for in the previous standard. The final rule adopts this 
approach and requires that at least once during each shift, or more 
often if necessary for safety, a certified person designated by the 
operator must conduct an on-shift examination of each section where 
anyone is assigned to work during the shift and any area where 
mechanized mining equipment is being installed or removed during the 
shift. As with other changes to this section, comments were received 
both supporting and opposing the change. One commenter in opposition to 
the standard argued that although the operator is required to maintain 
a safe work environment at all times, documentation should not be 
required for each inspection that is made of the working environment 
throughout the shift. The commenter is correct in stating that the 
rule, in Sec. 75.363, requires additional documentation. However, the 
only additional documentation required will be for hazardous conditions 
found during the additional on-shift examination conducted on non-coal 
producing sections where miners are working. The additional 
documentation required does not override the need for the standard. 
Another commenter suggested that the term ``more often if necessary for 
safety'' be changed to ``more often if necessary for safety as 
determined by the operator depending on the mining conditions at the 
time.'' This commenter stated that conducting additional checks for 
safety is a current practice and individuals working on the section, 
including the section foreman, are the most familiar with conditions in 
that area and should make the determination whether additional 
examinations are needed. MSHA agrees with this commenter that persons 
working on a section are in the best position to identify the need for 
additional examinations. The suggested language has not been adopted, 
however, because MSHA believes that this determination should not be 
limited to persons working on the section.
    Another commenter supported the proposal and listed explosions that 
have occurred which, in the opinion of the commenter, could have been 
prevented had additional on-shift examinations been made. MSHA agrees 
that there are occasions when additional on-shift examinations are 
necessary for safety and, therefore, the final rule requires that on-
shift examinations be conducted at least once each shift, or more often 
if needed for safety.
    The final rule retains the existing provision of paragraphs (a)(1), 
(c)(1) and (c)(2) requiring an on-shift examination of areas where 
mechanized mining equipment is being installed or removed. An in-depth 
discussion of the reproposal of provisions concerning the installation 
and removal of mechanized mining equipment is presented in the General 
Discussion section of this preamble.
    Paragraph (a)(2) adds a new on-shift examination requirement to 
address respirable dust control. Under the final rule, before coal 
production begins on a section, an examination for compliance with the 
dust control measures established in the mine ventilation plan must be 
completed. This examination includes measurement of air quantities and 
velocities, water pressures and flow rates, a check for excessive 
leakage in the water delivery system, and checks of the number of 
operating water sprays and their orientation as well as the placement 
of section ventilation control devices.
    Assuring full compliance with these requirements is important in 
safeguarding the health of miners. Human and financial costs 
demonstrate the need for further attention. In 1990, approximately 2000 
deaths were associated with Coal Worker's Pneumoconiosis and the total 
number of deaths between 1968 and 1990 were over 55,000. As of 1993, 
total annual Black Lung Program costs were over $1.3 billion and the 
cumulative total cost had exceeded $30 billion.
    Agency experience shows that needed attention has not always been 
given to the proper functioning of respirable dust controls. For 
example, a series of special spot inspections, undertaken in 1991 to 
conduct checks of the dust control parameters during the course of 
working shifts, revealed that 21 percent of the 781 mining units 
sampled were not complying with one or more of their dust control 
parameters. In its 1992 report, an MSHA Task Group recommended coal 
mine operators be required to make periodic on-shift examinations to 
verify that the mine ventilation plan parameters are in place and 
functioning as intended. MSHA considers on-shift examinations of 
respirable dust controls an important part of reasonable and prudent 
respirable dust control strategy.
    Several methods of measuring water spray pressures would be 
acceptable. For example, water flow and pressure can be monitored 
through the installation of an in-line water meter and a pressure 
transducer. Water pressure can also be measured by permanently 
installing a pressure gauge on a machine. Operators would determine the 
working relationship between the pressure gauge reading and the actual 
operating pressure at the sprays. Once the working relationship has 
been established, the gauge pressure could be used to indicate the 
actual spray pressure specified in the mine ventilation plan for a 
given number and type of operating sprays.
    Measurement of any required water flow rate could be accomplished 
through the installation of a flowmeter. A flowmeter provides a direct 
and reliable measurement and is the preferred method of determining 
water flow rate. Another acceptable method of determining flow rate 
would be to establish the relationship between the water pressure and 
the spray orifice diameter, either through engineering data or through 
actual tests. Once established, the water pressure gauge reading could 
be used to reliably indicate a flow rate for a specific number of 
sprays at a given orifice size.
    One commenter, while generally supportive of the requirement for an 
on-shift examination of respirable dust controls, expressed concern 
over permitting the use of in-line flowmeters 

[[Page 9799]]
and pressure transducers. The commenter stated that leaks in the 
location of the flowmeter and pressure transducer could go undetected, 
resulting in a loss of pressure and flow at the sprays. MSHA agrees 
that undetected leaks could result in improper operation of the system. 
To address this point, the final rule has been revised from the 
proposal to require that a check for excessive leakage in the water 
delivery system be made during the on-shift. This commenter also 
suggested that use of incorrect spray nozzles could result in improper 
operation of the system that would not be detected with in-line 
flowmeters and pressure transducers. MSHA would expect that as part of 
the examination of the number of operating sprays a check would be made 
to assure that the proper sprays are being used.
    The final rule requires that the number of water sprays and their 
orientation be included in the examination. While spray orientation is 
important in air-directing spray systems, such as sprayfans and 
shearer-clearers, MSHA does not intend that precise angles be 
determined during each examination. Rather, the examiner would be 
responsible for assessing whether the direction and orientation of the 
sprays are generally correct and in accordance with the requirements of 
the mine ventilation plan.
    The final rule also requires that the working section ventilation 
and control device placement be examined for compliance with the mine's 
ventilation plan. Mine ventilation, particularly where coal extraction 
occurs, is a basic respirable dust control measure.
    Any other respirable dust controls specified in the approved mine 
ventilation plan are also included in the scope of the examination 
required under the final rule. An example of such controls is the 
cleaning and maintenance procedures for a wet bed scrubber installed on 
a continuous mining machine. The examination would include a check to 
assure that air inlets and discharges are not plugged. It is not MSHA's 
intent that the air quantity produced by a machine-mounted scrubber be 
measured as part of the on-shift examination required by paragraph 
(a)(2), unless such a requirement is included as a part of the mine 
ventilation plan.
    MSHA is aware that through advances in technology it may be 
feasible to continuously monitor air quantity and velocity, and spray 
water flow rate and pressure. Continuous monitoring offers the 
potential to further improve miner protection by providing real-time 
data on the performance and condition of key dust control measures. 
This information can be used to give early warnings of deteriorating 
dust controls, allowing corrective action to be taken before the dust 
control system fails to protect miners from excessive dust levels. 
Although continuous monitoring will eliminate the need for periodic 
physical measurements to verify proper operation of some dust controls, 
visual observation of other controls will still be necessary. Among 
these are the number and location of operating water sprays, their 
general condition and orientation, the section ventilation setup and 
control device placement, the check for excessive leakage in the water 
delivery system, and other control measures where performance and 
operating condition can only be assessed visually.
    One commenter suggested that MSHA not permit the use of continuous 
monitoring in lieu of physical checks because technology to permit such 
monitoring is not as yet available. The final rule is intended to be 
sufficiently flexible to permit the use of new technology, such as 
continuous monitoring and sensing devices, and also to encourage the 
introduction of such modern equipment. The final rule does not require 
the physical measurement of the air velocity and quantity, water 
pressure and flow rates if continuous monitoring of the dust control 
parameters is used and indicates that the dust controls are functioning 
properly.
    The on-shift examination of the dust controls is to be completed 
under the direction of a person who has been designated by the 
operator. The proposal would have required that a certified person 
conduct the examination. One commenter objected to this approach, 
suggesting that the completion of this examination would require 
considerable time and that a more thorough examination could be 
accomplished by a person(s) familiar with the equipment and the dust 
control measures being utilized. This commenter recommended that MSHA 
remove the word ``certified'', thus permitting the examination to be 
conducted by persons other than certified persons. A second commenter 
argued that the examination should be conducted by a single individual 
because other persons may be assigned to a section who are not familiar 
with the requirements of the mine ventilation plan for that section.
    The final rule deletes the word ``certified,'' permitting on-shift 
examinations of dust controls to be conducted by one or more persons 
who are not certified individuals. However, the examination must still 
be conducted under the direction of a person designated by the operator 
and as set out in paragraph (g)(2), a certified person must certify 
that the examination has been completed. MSHA would expect that the 
person directing this examination would be present at the site of the 
examination while the examination is conducted.
    Another commenter recommended that the final rule not specify the 
measurements that are to be made need during the on-shift examination 
of dust controls, and that the standard be rewritten to require such an 
examination be sufficient to assure compliance with the respirable dust 
parameters specified in the mine ventilation plan. Because it is 
possible to identify specifically some of the parameters that must be 
measured in all instances the suggestion of the commenter has not been 
adopted. By identifying these parameters in the final rule, 
misunderstandings over whether a plan specification is for dust control 
or methane control, for example, can be eliminated.
    As proposed, paragraph (a)(2) would have required that the 
respirable dust control portion of the examination be made at or near 
the beginning of the shift and before production begins on a section. 
One commenter suggested that such a requirement would eliminate the 
common practice of changing shifts on the section without an 
interruption in production. MSHA recognizes that changing crews without 
an interruption in production has become a common practice in some 
areas and does not intend that this practice be changed by this rule. 
The final rule has revised the proposal so that when a shift change is 
accomplished without an interruption in production on a section, the 
required examination may be made any time within 1 hour of the shift 
change. In those instances when there is an interruption in production 
during a shift change, the final rule requires that the on-shift 
examination of respirable dust controls be made before production 
begins on a section. The proposed wording ``at or near the beginning of 
the shift'' has not been included in the final rule in recognition of 
the fact that production on a section could be delayed and not begun 
until well after the beginning of the shift. Because the purpose of the 
standard is to assure that dust exposures are controlled during mining, 
the on-shift examination must be conducted prior to the beginning of 
production in order to be most effective.
    Other commenters objected to examining respirable dust control 
parameters for various reasons. Some commenters stated that operators 
are 

[[Page 9800]]
required to comply with the requirements of the mine ventilation plan 
relative to dust control and a separate requirement is not needed. The 
measurements specified in the final rule are a practical way to provide 
reasonable assurance that miners are not being exposed to unhealthy 
levels of respirable dust. The purpose of these checks is not to 
restate the requirements for compliance with the mine's ventilation 
plan. Instead, as discussed above, the final rule is intended to bring 
needed attention to the proper functioning of dust controls before 
production begins.
    Other commenters expressed the opinion that coal production should 
not be delayed until after the completion of the examination of dust 
controls. According to these commenters, this examination will take the 
certified person away from other examinations that must be completed to 
assure safety. As explained previously, the final rule has been revised 
to permit the changing of crews without an interruption in production. 
The completion of the on-shift examination of dust control parameters 
can be postponed for up to 1 hour when crews are switched out at the 
face. Additionally, the final rule has been revised to permit the 
examination of dust control parameters to be performed by a person(s) 
other than a certified person and to simply require the certified 
person to certify that the examination was completed. These revisions 
substantially reduce any delay in production that could have resulted 
under the rule as proposed.
    Another commenter objected to the requirements of paragraph (a)(2) 
stating that examination of dust controls is unnecessary because all 
personnel are required to be trained in the requirements of all 
approved mine plans including the mine ventilation plan, and many of 
the required mine ventilation plan parameters are checked during the 
pre-shift examination. The commenter stated further that other 
parameters, such as number of water sprays and pressure, are checked by 
the equipment operators during the pre-operational inspection. In the 
opinion of the commenter, the proposed examination of dust control 
parameters is redundant and unnecessary.
    The requirements of paragraph (a)(2) are not redundant with 
existing standards. There is no requirement for a pre-operational 
inspection of dust controls. For the reasons discussed above, MSHA 
considers examination of dust controls for proper functioning to be an 
important practical measure for protecting miners'' health. To the 
extent that these checks are currently being made by some operators, 
together with the flexibility of the final rule, the burden of making 
these checks is minimized.
    The final rule requires in paragraph (a)(2) that deficiencies found 
during the on-shift examination of dust controls be corrected before 
production begins, or when crews are changed without an interruption in 
production, before production continues. The proposal would have 
required that deficiencies in the controls be corrected immediately. 
However, the final rule revises the proposal in response to one 
commenter who pointed out that the correction of deficiencies is 
important prior to production, in view of the purpose of the rule.
    Another commenter suggested that the examination of dust controls 
be conducted after production begins so as to be more representative of 
production conditions. In contrast, another commenter observed that if 
the required dust control parameters are not being met before 
production is begun, it is unlikely that they will be met after 
production is started. This commenter suggested multiple examinations, 
one before production begins and one at some later time during the 
shift. MSHA agrees that if dust control measures are deficient before 
production begins it is unlikely that they will be corrected later in 
the shift. Therefore the final rule requires the on-shift examination 
of the dust control measures prior to the beginning of production. The 
final rule, however, does not include the recommendation for an 
additional examination of dust control measures.
    Paragraphs (c)(1) and (c)(2) require certified persons conducting 
on-shift examinations to take air measurements at the same locations 
where air measurements are required during the preshift examination. 
This includes areas where mechanized mining equipment, including 
longwall or shortwall mining equipment, is being installed or removed. 
Reduced volume or velocity of air during the shift can contribute to 
increased levels of respirable dust, methane accumulations, or oxygen-
deficient atmospheres. Checking the mine's ventilation system verifies 
that changes in the mine ventilation system due to the production 
process have not occurred.
    The final rule removes the word ``working'' from paragraph (c)(1) 
to assure that the application of the standard would extend to all 
sections, consistent with paragraph (a). Many of the activities to 
which miners are assigned are on sections not normally thought of as 
``working sections,'' a term associated with coal production. For 
purposes of Sec. 75.362, a section in the mine is considered to be the 
area inby the loading point; or, in the case of the installation of 
mechanized mining equipment, inby the proposed loading point; or, in 
the case of the removal of mechanized mining equipment, inby the 
location of the last established loading point. The final rule requires 
in paragraphs (a)(1), (c)(1), and (c)(2) that the certified person 
conducting the on-shift examination examine the section in much the 
same way as it would be examined during a coal producing shift, 
including checking for hazardous conditions, testing for methane and 
oxygen deficiency, determining if the air is moving in its proper 
direction, and measuring the volume of air in the last open crosscut or 
in the intake of longwalls or shortwalls, as appropriate.
    Some commenters objected to this provision stating that there is 
little safety benefit to requiring on-shift examinations on sections 
other than working sections where coal is being produced. The final 
rule does not limit on-shift examinations to ``working sections'' but 
includes other areas where persons are working. Hazards similar to 
those that develop on a coal producing section can also develop during 
a shift on sections that are not producing, but where personnel are 
assigned to work.
    Paragraph (d)(1)(i) requires that at the start of each shift, 
before electrically operated equipment is energized, a qualified person 
test for methane at each working place. One commenter suggested that 
the existing standard is sufficient because quite often in today's 
mining practices equipment is already energized at the start of the 
shift since one equipment operator takes over from the previous 
operator and examinations for methane have been performed every 20 
minutes as required by Sec. 75.362(d)(1)(ii). MSHA does not agree that 
the existing standard is sufficient for a number of reasons. First, 
although the commenter is correct in stating that switching operators 
while the equipment remains energized is a relatively common practice 
it is not a universal practice. In mines where equipment is deenergized 
between shifts, the final rule provides for a test for methane in each 
working place prior to the equipment being energized. On sections in 
mines where equipment operators are switched while equipment remains 
energized, MSHA would consider a methane test performed during the 
previous 20 minutes under paragraph (d)(1)(iii) as sufficient to comply 
with the methane test requirement of paragraph (d)(1)(i) for the 
working place where mining is taking place. However, paragraph 

[[Page 9801]]
(d)(1)(i) also requires that methane tests be made in other working 
places on the section not only in the working place where the equipment 
is being operated.
    The final rule requires in paragraph (d)(1)(iii) that methane tests 
be made more frequently than 20 minutes if required in the approved 
mine ventilation plan at specific locations, during the operation of 
equipment in the working place. One commenter objected to this 
requirement expressing the opinion that the standard does not identify 
situations in which more frequent methane tests would be warranted and, 
therefore, operators could be faced with a requirement to conduct 
additional methane tests which are unwarranted and would result in the 
misallocation of safety resources. The final rule is intended to 
address situations such as an abnormally high methane liberation rate 
in a mine or an area of a mine that would warrant more frequent testing 
for methane. Like the existing standard the final rule requires this 
test to be made by a qualified person, not a certified person, thus in 
most cases the person who makes the test will be the machine operator. 
As a result, this test will not require that other safety-related 
activities be stopped to make a test for methane.
    Under the existing rule, methane tests required by paragraph (d)(1) 
were to be made at the last permanent roof support unless the mine 
ventilation plan required that they be made closer to the face using 
extendable probes. Paragraph (d)(2) of the final rule revises this 
standard and requires that the methane tests specified in paragraphs 
(d)(1)(i) through (d)(1)(iii) be made at the face from under permanent 
roof support, using extendable probes or other means. Like the existing 
standard, paragraph (d)(2) requires that for longwall and shortwall 
mining systems, the tests are to be made at the cutting head. When 
mining has been stopped for more than 20 minutes, methane tests must be 
made prior to the start up of the equipment.
    During informational meetings following the publishing of the 
existing standard, it became apparent that a large segment of the 
mining community felt that methane tests should be made as close to the 
working face as practicable without exposing miners to unsafe 
conditions. MSHA agrees that proper testing for methane at the face is 
essential for safe mining operations. The need for making methane tests 
at the face has been demonstrated by researchers and engineers from the 
U.S. Bureau of Mines and MSHA through work performed over the last 25 
years. This work documents that in a working place the concentrations 
near the face are considerably higher than other areas in the working 
place. For example, Luxner, in Bureau of Mines Report of Investigation 
7223, ``Face Ventilation in Underground Bituminous Coal Mines,'' 
published in 1969, reported methane concentration in excess of 5 
percent as far back as 15 feet using both blowing and exhaust 
ventilation systems with a curtain-to-face distance of 20 feet. The 
concentration outby this location as reported by Luxner was between 
zero and 1 percent. Later, Haney, et al., also showed lesser 
concentrations of methane further from the face using various types of 
assisted ventilation systems.
    A speaker at one of the public hearings on the proposal suggested 
that tests should be made at the last row of bolts and if 0.2 percent 
of methane is found at that location, a probe should be used to test at 
the face. The final rule does not adopt this recommendation because 
MSHA is unaware of any tests that relate the concentration of methane 
at the face with the concentration at the last row of bolts. Based on 
current knowledge, it is doubtful that such a direct correlation could 
be made because of the number of variables involved.
    A recurring comment concerning taking methane tests at the face 
with a probe was that such a requirement will lead to an increase in 
the number of back injuries among miners. However, other commenters 
supported the requirement and stated that probes as long as 40 feet are 
currently being used in some areas of the country. Miners with 
experience in using these probes testified at the rulemaking hearings 
that although the long probes can at times be difficult to use, they 
are being used and are providing measurements of methane at the face in 
mines operating in coal seams as low as 37 inches.
    The possibility of an increase in the number of back injuries is of 
serious concern to MSHA. However, after reviewing all of the written 
comments and testimony taken during public hearings, particularly that 
of miners having experience with the use of probes, MSHA is persuaded 
that this is a reasonable approach and will achieve the desired safety 
results without undue risk of back injuries.
    Several commenters suggested that in lieu of requiring methane 
tests at the face, MSHA should permit the use of the methane monitor to 
satisfy the requirement. In making this recommendation, one commenter 
suggested that the methane monitors should not be required to be 
installed on face equipment if they cannot also be used to test for 
methane in unsupported faces. Methane monitors have proven reliable 
over the years and provide a second level of protection against methane 
ignitions. Methane monitors provide for methane detection at a fixed 
location while the use of a methane detector with a probe permits 
methane measurements to be made at various locations in the face area.
    Historically, machine-mounted methane monitors have been used as a 
backup for the other required tests. This concept was exactly what 
Congress recognized in Sec. 303(l) of the Coal Mine Health and Safety 
Act of 1969 (Coal Act). Discussing this provision, the conference 
managers noted ``...the methane monitor is an additional backup device 
for detecting methane and should not be construed as a substitute for 
the other tests and testing devices required in this title for 
detecting and controlling methane.'' H.R. Conf. Rep. No. 91-761, 91st 
Cong., 1st Sess. 80 (1969).
    The final rule does not adopt the suggestion of commenters that 
methane monitors be accepted in lieu of the methane tests required by 
paragraph (d)(2).
    Paragraph (g)(1) adopts the language of proposed paragraph (g) and 
requires that the person making the on-shift examination in belt 
haulage entries certify by initials, date, and time that the 
examination was made at enough locations to show that the entire area 
has been examined. As explained in the preamble to the proposal, the 
existing rule does not require certification that examinations were 
conducted in belt conveyor entries. Comments received expressed the 
view that without certification, no mechanism exists to verify that 
examinations were conducted in belt conveyor entries. Other commenters 
questioned what MSHA meant by ``enough locations.'' MSHA agrees with 
the commenter that the certification requirement should be added to the 
rule to provide a means to verify that the examination has taken place. 
With respect to the locations where the certification should be made, 
this certification process is a common practice in the industry and is 
required by several state regulations. The locations where 
certification would be expected to be kept are no different than those 
which were required for many years under the previous MSHA regulation 
and which have been commonly accepted in the industry. Paragraph (g)(2) 
is a new requirement relating to the certification of the examination 
of respirable dust control parameters. Under (g)(2), the person making 
the on-shift examination to assure compliance with the respirable 

[[Page 9802]]
dust control parameters specified in the mine ventilation plan must 
certify by initials, date, and time that the examination was made.

Section 75.363  Hazardous Conditions; Posting, Correcting, and 
Recording

    Section 75.363 is a new section requiring the posting, correcting 
and recording of hazardous conditions. The posting of hazardous 
conditions against entry is a time tested method for preventing 
accidents. Examiners, upon finding a hazardous condition, erect 
``danger boards'' to alert persons traveling in the area of the 
presence of the hazard. In this manner, miners are prevented from 
inadvertently entering an area where a hazard exists. Section 75.363 
requires that hazardous conditions be posted and access to the area be 
limited; that the hazardous conditions be corrected immediately or 
remain posted; and, that a record be made and maintained of the 
hazardous condition and the action taken to correct the condition. 
Records of the hazards and the actions required to correct the hazards 
provide valuable safety information about conditions in the mine and 
the effectiveness of corrective measures.
    MSHA's final rule modifies the proposal in several ways. The final 
rule deletes the phrase ``or reported to'' that appeared in the first 
sentence of proposed Sec. 75.363(a) and deletes the requirement for 
countersigning by a second level official. It specifies that, except 
for preshift or preshift type examinations, hazardous conditions shall 
be corrected immediately or posted until the conditions are corrected. 
The final rule allows for countersigning by an official equivalent to 
the mine foreman and provides for storage of records in either a secure 
book or in electronic media which is not susceptible to alteration.
    It is essential that all hazardous conditions, regardless of when 
detected or by whom, be adequately addressed. Commenters suggested that 
the proposed standard be deleted because, in their opinion, other 
standards provide adequate coverage. One commenter interpreted the 
proposed standard as being directed at only those hazards found during 
the on-shift examination and supplemental examinations, because 
hazardous conditions found during the preshift and weekly are excluded 
from the standard. This commenter recommended rewriting the 
requirements for the on-shift and supplemental examinations to reflect 
the needed changes.
    Section 75.363 is not directed only toward hazardous conditions 
found during examinations. Hazardous conditions occur and are found at 
times during the shift when examinations are not being made. Under the 
final rule, these hazardous conditions would also require posting, 
correction, and recording when found by the mine foreman or equivalent 
mine official, assistants to the mine foreman or equivalent mine 
official, or other certified persons designated by the operator to 
conduct examinations.
    One commenter questioned whether the proposed standard was intended 
to assign new duties to the mine foreman and assistant mine foremen. 
The final rule does not impose additional responsibilities on the mine 
foreman and assistant mine foremen. However, these individuals are 
certified and routinely travel throughout the mine for purposes other 
than making examinations. The standard requires that hazardous 
conditions found by the mine foreman, assistant mine foreman, or 
equivalent mine officials, be treated the same as hazardous conditions 
found by other certified persons who have been designated to conduct 
examinations. That is, the hazardous conditions are to be appropriately 
posted, corrected, and recorded. The term ``equivalent mine officials'' 
has been added in response to commenters who suggested that the term 
``mine foreman'' is no longer used at all mines.
    Under paragraph (a) any hazardous condition found by the mine 
foreman or equivalent mine official, assistants to the mine foreman or 
equivalent mine official, or other certified persons designated by the 
operator to conduct examinations is to be posted with a conspicuous 
danger sign. The posting requirements of this section apply to every 
hazardous condition regardless of when it is found. Under the proposal, 
hazardous conditions reported to the mine foreman, assistants to the 
mine foreman or other certified persons designated by the operator to 
conduct examinations would have required posting. Commenters suggested 
that requiring hazardous conditions ``reported to'' these individuals 
would eliminate the judgement of the persons responsible for making 
decisions about whether or not a hazardous condition exists. One 
commenter suggested that the requirement, as proposed, could undermine 
the integrity of the certified person. The final rule is revised to 
require that hazardous conditions found by the mine foreman or 
equivalent mine official, assistant mine foreman or equivalent mine 
official, or other certified persons designated by the operator for the 
purpose of conducting examinations shall be posted with a conspicuous 
danger sign and shall be corrected immediately or remain posted. MSHA 
would expect that when a hazardous condition is reported to these 
certified persons, that the measures necessary to evaluate the 
situation and, if necessary, to comply with the provisions of this 
section would be taken.
    One commenter suggested that the proposed requirement that all 
hazardous conditions be corrected ``immediately'' would diminish safety 
because miners could be exposed to hazards unnecessarily. The commenter 
offered as an example an area of bad roof in a ``remote, unused 
crosscut'' and suggested that in this case posting of the area against 
entry would be sufficient. MSHA recognizes that there are instances, 
such as the example presented by the commenter, where safety is best 
served by simply posting the area against entry. This has long been the 
practice in the industry and the final rule does not prevent this from 
continuing. In these cases, the corrective action required to prevent 
injury is to preclude persons from entering the area. The proposal 
would have required that the hazardous condition be corrected 
immediately and that the area remain posted until the hazardous 
condition is corrected. To reflect the recommendation of the commenter, 
the final rule requires that the hazardous condition be corrected 
immediately or that the area remain posted until the hazardous 
condition is corrected. The Agency recognizes that in some instances 
posting the area against entry is the corrective action.
    The requirement that the hazardous conditions be corrected 
immediately does not necessarily require correction by the certified 
examiner finding the condition. To do so could delay the completion of 
the examination. Rather, the final rule requires that the hazardous 
condition be corrected following the reporting of the condition by the 
examiner to the appropriate mine official. Common sense and sound 
judgement should enter into the decisions as to when hazardous 
conditions are corrected. Posting of the area where the hazardous 
condition exists in order to prevent entry is to be accomplished by the 
certified person finding the hazardous condition.
    One commenter questioned whether proposed paragraph (a) would 
require the hazardous condition itself be posted. The posting of the 
area, as opposed to the hazardous condition itself, would, in most 
cases, be more effective and a safer practice. For instance, if a 
section 

[[Page 9803]]
of bad roof is detected, it would be in the best interest of safety to 
mark the area or perimeter of the area of bad roof instead of the roof 
itself. The ``danger'' sign would be placed at a location where anyone 
entering the area of the hazardous condition would pass so that persons 
approaching the area would be expected to see the ``danger'' sign. The 
area would remain posted until the hazardous conditions are corrected. 
The posting of areas where hazardous conditions exist to alert persons 
is a long-standing accepted safety practice in the mining community.
    Paragraph (a) requires that once an area is posted due to a 
hazardous condition, only persons designated by the operator to correct 
or evaluate the condition may enter the posted area. Additionally, if 
the hazardous condition creates an imminent danger, everyone must be 
withdrawn from the affected area to a safe area until the condition is 
corrected. Persons referred to in section 104(c) of the Act are 
permitted to enter in the area.
    One commenter suggested that the representative of the miners be 
permitted to enter an area which has been posted with a ``danger'' in 
order to evaluate the condition. The final rule follows the statutory 
provision in Sec. 104(c) of the Mine Act. This l
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
ongstanding requirement 
provides that only persons designated by the operator to correct or 
evaluate the hazardous condition may enter such posted areas. With 
respect to the representative of miners, Sec. 104(c)(3) provides that 
the representative of the miners in such mine who is, in the judgment 
of the operator or an authorized representative of the Secretary, 
qualified to make mine examinations or who is accompanied by such a 
person and whose presence in such area is necessary for the 
investigation of the hazardous condition may enter the area.
    Paragraph (b) requires that a record of hazardous conditions be 
made by the end of the shift on which the condition was found. This 
record is required to be maintained on the surface and must include the 
nature and location of the hazardous condition and the corrective 
action taken. A record of all hazards found, as well as the required 
corrective action, serves as a history of the types of conditions that 
can be expected in the mine. When the records are properly completed 
and reviewed, mine management can use them to determine if the same 
hazardous conditions are recurring and if the corrective action being 
taken is effective. No record is required on any shift on which no 
hazardous conditions are found. Paragraph (b) excludes hazardous 
conditions found during the preshift and weekly examinations because 
these examinations have separate record keeping requirements.
    Commenters recommended rewording the standard to eliminate the 
provisions that no record is required on any shift on which no 
hazardous condition is found and that the corrective action taken must 
also be recorded. These suggestions were offered to clarify the 
standard. MSHA believes that deleting these requirements would not 
clarify the rule and the suggestions are not adopted in the final rule.
    Paragraph (c) requires that a record be made either by the 
certified person who conducted the examination or by a person 
designated by the operator. As with other records required by this 
subpart, when the record is made by a designated person other than the 
certified person making the examination, the person making the record 
need not be certified. If the record is made by a person designated by 
the operator, the certified person must verify the record by initials 
and date. MSHA did not receive any comments objecting to this part of 
the standard. Like the other recordkeeping requirements in the 
proposal, proposed paragraph (c) would have required that the record be 
made in a state-approved book or a bound book with sequential machine-
numbered pages. Additionally, the proposal would have required 
countersigning by both the mine foreman and the superintendent or 
equivalent individual to whom the mine foreman reports. The final rule 
requires that the records of hazardous conditions must be kept in 
either secure books that are not susceptible to alteration, or 
electronically in a computer system so as to be secure and not 
susceptible to alteration. A detailed discussion of record books and 
the use of computers to maintain records can be found in the General 
Discussion of this preamble.
    A variety of comments were received regarding the countersigning of 
the record by the mine foreman, and the time permitted for 
countersigning. The final rule adopts the proposal that the mine 
foreman or equivalent mine official must countersign the record of 
hazardous conditions by the end of the mine foreman's next regularly 
scheduled working shift. The mine foreman is responsible for the day-
to-day operation of the mine. It is essential for the health and safety 
of the miners that the mine foreman be fully aware of the information 
contained in this record so as to be able to allocate resources to 
correct safety problems as they develop. Allowing until the end of the 
mine foreman's next regularly scheduled working shift to countersign 
the records assures that the mine foreman is aware of hazardous 
conditions in sufficient time to initiate corrective actions.
    Some commenters suggested that the time for countersigning is 
unnecessarily long, and that the final rule should require daily 
countersigning by the mine foreman. The rulemaking record does not 
show, however, that the time set by the final rule would expose miners 
to safety or health risks. Also, hazardous conditions must be corrected 
immediately or the area must remain posted until the condition is 
corrected.
    Numerous comments were received regarding the requirement of the 
proposal for second level countersigning of the preshift examination 
record by the mine superintendent, mine manager, or other mine official 
to whom the mine foreman is directly accountable within 2 scheduled 
production days after the countersigning by the mine foreman. The final 
rule does not retain this proposed requirement. A detailed discussion 
of the subject of second level countersigning can be found in the 
General Discussion section of this preamble.
    As proposed, paragraph (d) of the final rule requires that the 
records required by Sec. 75.363 be maintained at a surface location at 
the mine for one year and be made available for inspection by 
authorized representatives of the Secretary and the representative of 
miners. Comments on this requirement were generally favorable. A 
discussion of comments concerning the use of computers to maintain 
records can be found in the General Discussion of this preamble.

Section 75.364  Weekly Examination

    The weekly examination is directed at hazards that develop in the 
more remote and less frequently visited areas of a mine. These areas 
include: worked-out areas where pillars have not been removed, bleeder 
entries used to ventilate worked-out areas where pillars have been 
removed and, some main intake and return air courses. Over the course 
of time, hazards such as methane accumulations and obstructions to 
ventilation can develop in these areas and can result in an explosion 
or loss of ventilation if not discovered and corrected. Because of the 
confined nature of the underground mining environment, loss of life can 
result in other areas of the mine outside the immediate location of the 
hazard. The weekly examination assures that these hazards are located 
and corrected.
    Generally, Sec. 75.364 requires an examination in unsealed worked-
out areas that have not been pillared; travel 

[[Page 9804]]
in bleeder entries and the performance of appropriate measurements in 
these entries and; a check for hazardous conditions in return and 
intake air courses, in each longwall travelway, at each seal along 
return and bleeder air courses and each seal along intake air courses 
not otherwise examined, in each escapeway, and each working section 
that has not been preshift examined during the previous 7 days.
    The final rule modifies existing Sec. 75.364 (a), (b), and (h). It 
adopts several proposed changes to Sec. 75.364 and modifies or rejects 
other proposed changes.
    Paragraph (a) specifies weekly examination requirements in unsealed 
worked-out areas where no pillars have been recovered as well as in 
bleeder systems. The final rule requires that unpillared worked-out 
areas and bleeder systems be physically examined on a weekly basis and 
specifies the tests and measurements to be performed by the examiner. 
The final rule identifies two separate locations within nonpillared 
areas and bleeder systems where measurements may be required. First, 
measurement points must be included in the mine ventilation plan to 
identify the locations within unpillared worked-out areas and bleeder 
systems where examiners will conduct air measurements and tests, the 
results of which are to be recorded. These measurement points are not 
in lieu of traveling the system, but rather are the locations where the 
examiner will perform air quantity and quality tests and measurements 
to determine the effectiveness of ventilation. These points are 
tracking and evaluation tools to assure adequate ventilation and to 
identify developing trends in ventilation or air quality which may 
require attention.
    Second, evaluation points may be approved in the mine ventilation 
plan on a case-by-case basis as provided under (a)(1) and by 
(a)(2)(iv). These evaluation points may be used in lieu of physical 
examinations. Evaluation points may only be approved in lieu of travel 
if the evaluation points are fully adequate to demonstrate that the 
area is ventilated. These provisions are discussed below.
    The final rule clarifies that measurement points for weekly 
examinations must be specified in the mine ventilation plan for both 
unpillared and pillared worked-out areas described in (a)(1) and 
(a)(2)(iii), respectively. These measurement points are distinct from 
the evaluation points which may be approved in lieu of a physical 
examination under some circumstances. As mentioned above, evaluation 
points are governed by (a)(1) for unpillared worked-out areas, and by 
(a)(2)(iv) for pillared worked-out areas ventilated by bleeder systems. 
Section 75.371(z) of the final rule refers to these requirements for 
both measurement points and evaluation points. The measurement points 
and evaluation points may be either in the body of the mine ventilation 
plan or may be shown on the 75.372 map. In either case, the locations 
are subject to approval by MSHA.
    Under paragraph (a)(1), at least every 7 days a certified person 
must examine unsealed worked-out areas where no pillars have been 
recovered by traveling to the area of deepest penetration; measuring 
methane and oxygen concentrations and air quantities and making tests 
to determine if the air is moving in its proper direction in the areas. 
The locations of measurement points where tests and measurements will 
be performed must be included in the mine ventilation plan and must be 
adequate in number and location to assure ventilation and air quality 
in the area. Air quantity measurements must be made where the air 
enters and leaves the worked-out areas. Sufficient methane and oxygen 
measurements must be made to assure the air quality in the worked-out 
areas. An alternative method of evaluating the ventilation of the areas 
may be approved in the mine ventilation plan.
    Under paragraph (a)(1), in addition to measuring oxygen and methane 
concentrations and testing for proper air direction, air quantities 
must also be determined. Air quantity measurements are required where 
air enters and leaves the worked-out area. The final rule also requires 
that a sufficient number of measurement points must be included in the 
mine ventilation plan to assure appropriate ventilation and air quality 
in the area.
    The changes to paragraph (a)(1) are in response to comments and 
MSHA experience with weekly examinations. Currently some examiners are 
simply traveling to the point of deepest penetration while conducting 
few if any tests or air measurements within the system. The full 
benefit of an examiner traveling to the point of deepest penetration is 
lost if the examiner does not conduct air quantity and quality 
measurements at key locations.
    The results of these measurements are important in assessing the 
effectiveness of ventilation. In addition, trends in either air 
quantity or quality can reveal developing problems which can be 
corrected in the earliest stages.
    One commenter suggested that the entire perimeter of worked-out 
areas should be physically examined to all points of deepest 
penetration. The commenter suggested that the face of each entry or 
room should be examined at its point of deepest penetration. MSHA 
agrees that travel to a single point of deepest penetration within an 
area may sometimes be inadequate to fully demonstrate effective 
ventilation of a worked-out area. The final rule addresses this issue 
by requiring that measurement points be established in the mine 
ventilation plan.
    Paragraphs (a)(2) (i) through (iv) of the final rule retain the 
requirement that at least every 7 days a certified person must evaluate 
the effectiveness of bleeder systems used under Sec. 75.334 (b) and 
(c). Like the proposal, the final rule also specifies tests and 
locations for an effective examination. One commenter noted that mine 
examinations are sometimes ineffective and supported the proposed 
additional specificity in the rule, requiring air measurements and 
tests at key locations or measurement points within worked-out areas. 
Established locations where examiners will conduct air measurement and 
tests will help assure effective examinations and provide quantitative 
results to the operator. The final rule requires that the mine 
ventilation plan include measurement points within worked-out areas and 
paragraph (h) requires that the results be recorded.
    Paragraph (a)(2)(ii) requires that measurements of methane and 
oxygen concentrations be made, air quantity be measured, and a test 
performed to determine if the air is moving in its proper direction at 
a point immediately before the air enters a return split of air. A 
commenter supported the proposed air measurements where air enters and 
leaves worked-out areas and correctly noted that such measurements 
would reveal some types of ventilation problems. In a special case, 
such as where it may not be possible to measure intake air, paragraph 
(a)(2)(iv) permits an alternate method of evaluation to be used when 
approved in the mine's ventilation plan.
    Another potential hazard exists when multiple intake openings lead 
into such an area, if passing intake air enters upstream openings of 
the worked-out area and reenters the intake from downstream openings. 
The final rule also requires that air quantity measurements be made 
where air enters and leaves worked-out areas. Measurements made where 
air enters and exits the area will alert the examiner and operator to 
airflow changes or imbalances which indicate a potentially dangerous 
ventilation problem. The specification of 

[[Page 9805]]
measurement points within worked-out areas will also assure that short 
circuits have not interrupted ventilation.
    One commenter stated that the standard should fully delineate all 
aspects of the weekly examination by specifying that the examination 
include roof and ribs, ventilation controls, water accumulations, etc. 
Although MSHA agrees that these and other conditions fall within the 
purview of the weekly examination, the final rule does not attempt to 
provide an exhaustive list of what is to be covered in a weekly 
examination. Examinations are performed by persons trained and 
certified as able to make the required examinations. Such certified 
persons can be expected to give proper attention to basic safety 
considerations.
    Paragraph (a)(2)(iii) requires that at least one entry of each set 
of bleeder entries used as part of a bleeder system under Sec. 75.334 
must be traveled in its entirety. Under the final rule, measurements of 
methane and oxygen concentrations and air quantities are required to be 
made during the examination. Also, a test to determine if the air is 
moving in its proper direction must be made at locations or measurement 
points, specified in the mine's ventilation plan. The measurements and 
tests provide the information necessary to determine the effectiveness 
of the bleeder system.
    One commenter believed that the proposal would require each 
parallel and common bleeder entry of a set to be traveled. The final 
rule is intended to simplify the examination and would, under the 
circumstances described by the commenter, require only one entry of a 
set of common entries to be examined in a bleeder system. Also, similar 
to the requirements for traveling intake and return air courses, this 
requirement should not be interpreted to require the examiner to stay 
in one entry. For example, if the examiner desires to ``zig zag'' 
between entries while traveling in a multi-entry bleeder system, this 
would be acceptable under the regulation provided tests and 
measurements are made at the appropriate locations.
    Paragraph (a)(2)(iv) provides that, in lieu of the requirements of 
(i) through (iii), alternative methods of evaluation may be specified 
in the mine ventilation plan provided that the alternative method 
results in proper evaluation of the effectiveness of the bleeder 
system. One commenter cited several explosions that were related to 
bleeder system deficiencies and linked poor design and inadequate 
maintenance with the provision allowing examination at evaluation 
points in lieu of traveling the area in its entirety. The thrust of the 
commenter's argument was that an inflexible standard requiring either 
full travel of a bleeder system or sealing of the entire area would 
result in superior designs and improved maintenance. While MSHA agrees 
with the commenter's ultimate objective of ensuring effective 
ventilation of bleeder systems and worked-out areas, MSHA does not 
agree that elimination of any flexibility within the standard would 
result in infallible designs. Since approval of evaluation points is 
only granted in cases where adequate ventilation can be determined 
through evaluation, MSHA believes that retaining flexibility to review 
individual cases is an appropriate method and results in proper 
evaluation of the effectiveness of the bleeder system.
    Paragraph (h) of the final rule governs recordkeeping requirements 
for weekly examinations. The final rule incorporates several revisions 
based on recommendations submitted by commenters. The final rule 
requires that at the completion of any shift during which a portion of 
a weekly examination is conducted, a record of the results be made. 
This record must include any hazardous conditions found during the 
examination and their locations, the corrective actions taken, and the 
results and location of air and methane measurements. The record must 
be made by the person making the weekly examination or a person 
designated by the operator.
    The final rule includes a revision requiring that the results of 
methane tests must be recorded as the percentage of methane measured by 
the examiner. Previously, terms such as ``ok,'' ``low,'' or ``trace'' 
were entered in record books as test results. The final rule clarifies 
that such qualitative terms are not acceptable when examination 
requirements specify the measurement of air quantity or methane levels 
as such entries provide little useful information.
    The final rule requires that if the record is made by a person 
other than the examiner, the examiner must verify the record by 
initials and date by or at the end of the shift for which the 
examination was made. As with other records required by this rule, the 
records of weekly examinations may be kept either in secure books that 
are not susceptible to alteration, or electronically in a computer 
system so as to be secure and not susceptible to alteration. A detailed 
discussion of record books and the use of computers to maintain records 
can be found in the General Discussion of this preamble.
    Commenters suggested that the final rule only require the examiner 
to record uncorrected hazardous conditions. MSHA is sensitive to 
minimizing recordkeeping requirements and, for example, the final rule 
requires only uncorrected defects found during the fan examination to 
be recorded. However, the weekly examination record serves as a history 
of the types of conditions that can be expected in the mine. When the 
records are properly completed and reviewed, management can use them to 
determine if the same hazardous conditions are occurring and if the 
corrective action being taken is effective. Additionally, this record 
can permit mine management, the representative of the Secretary, and 
the representative of miners to better focus their attention during 
examinations and inspections. The final rule adopts the proposal and 
requires the examiner to record all hazardous conditions found and the 
action taken to correct the hazardous condition.
    A variety of comments were received regarding the countersigning of 
the records of weekly examinations by the mine foreman, and the time 
permitted for countersigning. The final rule adopts the proposal that 
the mine foreman or equivalent mine official must countersign the 
record of the weekly examination by the end of the mine foreman's next 
regularly scheduled working shift. The mine foreman is in a key 
position of responsibility relative to the day-to-day operation of the 
mine. It is essential for the health and safety of the miners that the 
mine foreman be fully aware of the information contained in the 
preshift examination reports so as to be able to allocate resources to 
correct safety problems as they develop. Allowing until the end of the 
mine foreman's next regularly scheduled working shift to countersign 
the reports assures that the mine foreman is aware of the results on a 
regular and timely basis.
    Numerous comments were received regarding the requirement of the 
proposal for second level countersigning of the weekly examination 
record by the mine superintendent, mine manager, or other mine official 
to whom the mine foreman is directly accountable. A full discussion of 
second level countersigning can be found in the General Discussion 
section of this preamble.
    Paragraph (h) of the final rule also contains revisions to the 
existing rule to allow for electronic storage of records. Paragraph (i) 
requires that the records required by Sec. 75.364 be maintained at a 
surface location at the mine for one year and be made available for 
inspection by authorized representatives of the Secretary and the 
representatives of 

[[Page 9806]]
miners. A discussion of comments concerning the use of computers to 
maintain records can be found in the General Discussion of this 
preamble.
    Under the final rule, the record of weekly examinations must be 
countersigned by the mine foreman or equivalent mine official by the 
end of the mine foreman's next regularly scheduled working shift. Based 
on comments noting that traditional mine management structures have 
changes at some operations, the final rule provides that an official 
equivalent to mine foreman may countersign the records. The purpose of 
this change is to require that when a mine foreman is not present in 
the mine's management structure, an equivalent official must perform 
this function. As with the existing standard, second level 
countersigning by the mine superintendent is not required by the final 
rule.
    The record of weekly examinations must be made in secure media not 
susceptible to alteration. If records are made electronically, they 
must be unalterable, shall capture dates and signatures, must be 
accessible to representatives of the miners and the Secretary, and must 
be capable of producing printouts. Further discussion of both the 
issues of second level countersigning and acceptable record books or 
electronic records can be found in the general discussion section of 
this preamble.
    The proposal, at paragraph (b), would have added a requirement that 
the certified person examine for noncompliance with mandatory safety or 
health standards that could result in a hazardous condition. The 
proposal drew considerable objection. Commenters objected to the 
unlimited scope of the term ``noncompliance,'' the legal propriety of 
recording noncompliance, and the additional examination time required 
to determine noncompliance, the diversion of the examiner's attention 
away from key safety conditions to minor compliance issues. Even so, 
another commenter supported the proposal as necessary, suggesting that 
the earlier rule was intended to require operators to assure full 
compliance through the required examinations. The commenter correctly 
noted that a requirement to examine for safety and health violations 
was in effect from 1970 until 1992 when it was deleted.
    While the proposed standard appeared attractive in concept, the 
majority of comments received indicate that the standard would result 
in considerable confusion. In addition, it would be impractical to 
define and adequately limit the scope of the requirement. Comments 
consistently indicated confusion and misinterpretation of the 
proposal's scope, offering a wide range of interpretations.
    As discussed in the preamble to the 1992 rule, most hazards are 
violations of mandatory standards. Requiring the examiner to look for 
all violations regardless of whether they involve a distinct hazard 
could distract the examiner from the more important aspects of the 
examination. Despite an attempt in the proposal to limit the scope of 
the examination for noncompliance to situations that, ``could result in 
a hazardous condition,'' commenters expressed a high level of 
misunderstanding. Although a similar requirement existed between 1970 
and 1992, MSHA generally did not broadly apply the standard. After 
consideration of all comments and a review of the history since the 
current standard became effective, MSHA concludes that the existing 
standard is appropriate and best serves the objective of giving 
examiners clear guidance for making effective examinations. 
Accordingly, the proposal for examinations to include noncompliance 
with mandatory safety and health standards is not adopted in the final 
rule.
    Paragraph (b)(7) has been added to require that water pumps not 
examined as part of a preshift examination conducted during the 
previous 7 days be examined during the weekly examination. This 
modification is an outgrowth of comments received in response to 
proposed Sec. 75.360, which would have required examination of certain 
pumps. As discussed in the preamble to Sec. 75.360, one commenter 
persuasively argued that all pumps should be examined. Pumps that are 
not preshift examined under the final rule are generally located in 
remote areas of the mine. These pumps are appropriately examined on a 
weekly basis.

Section 75.370  Mine Ventilation Plan; Submission and Approval

    Mine ventilation plans are a long recognized means for addressing 
safety and health issues that are mine specific. Individually tailored 
plans, with a nucleus of commonly accepted practices, are an effective 
method of regulating such complex matters as mine ventilation and roof 
control. Section 75.370 requires that each mine operator develop and 
follow a ventilation plan that is approved by MSHA and that is designed 
to control methane and respirable dust in the mine. Section 75.370 
further requires that the plan be suitable to the conditions and mining 
system at the mine. In addition, Sec. 75.370 provides the procedures 
for submittal, review and approval of the plan to assure that the plan 
for each mine will address the conditions in that mine.
    In this final rule, MSHA revises the existing plan submission and 
approval process to provide an increased role for the representative of 
miners in the mine ventilation plan approval process. This revision is 
consistent with the statutory purpose that miners play a role in safety 
and health.
    The final rule redesignates existing paragraphs (b)(1) through (f) 
as (c)(1) through (g), revises paragraphs (a)(3), (c)(1), and (f), and 
adds a new paragraph (b). The proposal would have modified the existing 
rule by providing that the representative of miners would receive a 
copy of the proposed mine ventilation plan or proposed revisions at the 
time of submittal to MSHA, and the approved plan upon approval by MSHA. 
The existing rule provided that the submitted plan and the approved 
plan were to be made available to the miners representative. Another 
proposed change was to specify the length of time the submitted plan 
and the approved plan would be posted at the mine. A new paragraph (b) 
would allow for timely comments on the submitted plan from the miners 
representative. Representatives of miners would receive written notice 
of plan approval. The final rule, for the most part, adopts the 
proposed rule. However, the final rule requires that the miners 
representative be notified of the submittal of a mine ventilation plan 
and revisions to a plan 5 working days prior to submittal and that the 
representative of miners be provided with a copy of the plan upon 
request. It also requires that MSHA provide a copy of miners'' 
representative comments to the mine operator upon request.
    Final rule paragraph (a)(3) is divided into (a)(3)(i), (a)(3)(ii), 
and (a)(3)(iii) and contains new requirements in (a)(1)(i) and 
(a)(1)(iii). Paragraph (a)(3)(i) requires that the mine operator notify 
the representative of miners that a mine ventilation plan or a plan 
revision is to be submitted to the District Manager for approval. This 
notification must be given at least 5 days prior to submission. 
Paragraph (a)(3)(i) further requires that the operator provide a copy 
of the plan or revision to the representative of miners at the time of 
notification, if requested. Paragraph (a)(3)(ii) requires that the 
proposed plan be made available for review by the representative of 
miners, and paragraph (a)(3)(iii) requires that the proposed plan or 
revision be posted on the 

[[Page 9807]]
bulletin board at the mine and remain posted until it is approved, 
withdrawn, or denied.
    Commenters representing both operators and labor suggested that the 
proposed plan or revision should be provided to the representative of 
miners prior to being submitted to the district manager for approval. 
One commenter suggested that the proposed plan or revision be provided 
to the representative of miners 10 days prior to submittal and stated 
that this could speed up the approval process by allowing the miners 
affected to investigate the proposed change and by permitting the 
operator and the representative of miners the opportunity to reconcile 
differences prior to the operator's seeking approval. The commenter 
pointed out that some existing wage agreements have adopted such a 
requirement. The commenter suggested that the rule should also include 
such a requirement because operators do not always comply with the 
requirements of the agreement. This commenter further suggested that 
there have been instances where plans have been revised and acted upon 
before the representative of miners was aware that a revision was to be 
made. Other commenters suggested that the proposed plan or revision be 
provided 3 days prior to submittal. These commenters expressed 
different reasons for the suggestion. One of these commenters stated 
that the industry has historically maintained that since the plan is 
submitted to the district manager for approval, and developed by the 
mine operator, the requirement to provide copies to other parties is 
contrary to the Mine Act. However, the commenters further stated that 
their suggestion reflected an attempt to balance all interests and 
resolve this matter.
    These comments are constructive and MSHA has used all of them to 
fashion a final rule which is consistent with the statutory purpose and 
responsive to the mining community. One commenter attempted to relate 
the rule to terms of a wage and hour agreement. MSHA does not intend or 
have authority to affect any wage and hour agreement. MSHA believes 
that the involvement of the miners and their representative in the plan 
approval process will improve the health and safety of the Nation's 
coal miners. As suggested by commenters, miners who work under the mine 
ventilation plan are often in the best position to know the effect of 
proposed revisions. MSHA has long recognized the importance of input 
from the miners and their representatives in the plan-approval process. 
The preamble to the existing standard discusses the role of miners and 
their representatives in the development of mine ventilation plans in 
detail. MSHA continues to believe that miners have a stake in the 
implementation of the ventilation plan at each mine.
    The final rule is consistent with the existing plan approval 
process and does not change the process for developing and approving a 
mine ventilation plan. The operator continues to be the party 
responsible for developing the mine ventilation plan and MSHA continues 
to be responsible for reviewing and approving the plan. The proposed 
rule, in paragraph (a)(3)(i), would have required the operator to 
provide a copy of a proposed mine ventilation plan or any proposed 
revision to the representative of miners at the time of submittal to 
MSHA. The final rule requires the operator to notify the representative 
of miners of the submittal of the proposed plan or revision at least 5 
working days prior to submittal to the district manager. In addition, a 
copy is to be provided to the representative of miners upon request. In 
most instances, this should provide sufficient time for a review of the 
proposed plan or revision and a discussion between the operator and the 
representative of miners over concerns that may exist.
    In response to comments, paragraph (a)(3)(i) is further revised in 
the final rule to reflect that there are occasions when mine 
ventilation plans must be submitted and reviewed within a very short 
time frame. In response to a question during one of the public hearings 
on the proposed rule, one commenter stated that miners understand that 
at times situations may arise that necessitate an operator submitting a 
plan or revision to MSHA that will not allow for the ten (10) day 
provision for the representative of the miners.
    Paragraph (a)(3)(i) of the final rule requires that in the case of 
a situation requiring immediate action on a plan revision, notification 
of the revision shall be given, and if requested, a copy of the 
revision shall be provided to the representative of miners by the 
operator, at the time of submittal to the district manager. The final 
rule does not include the recommendation of one commenter that the plan 
or revision be provided to the representative of miners before 
submittal because to so require could delay approval of a change 
necessary to health and safety. Questions will undoubtedly arise 
relative to what constitutes a situation requiring expedited action. 
MSHA does not believe that it is possible or appropriate to set forth 
all circumstances which would be covered by the standard. Should such a 
situation arise, it would be handled by the district manager on a case 
by case basis. Generally, the district manager would be guided by 
whether the condition, if uncorrected, could result in a health or 
safety hazard or an imminent stoppage of production in the mine or an 
area of the mine.
    Paragraph (a)(3)(ii) of the final rule retains the requirement that 
a copy of the proposed plan or any proposed revisions be made available 
for inspection by the representative of the miners. Although some 
commenters thought this was superfluous in light of the requirement in 
paragraph (a)(3)(i), MSHA believes that this requirement facilitates 
the overall approval process.
    Paragraph (a)(3)(iii) of the final rule retains the existing 
requirement that copies of the proposed plan and proposed revisions be 
posted on the mine bulletin board and clarifies that posting is 
required at the time of submittal. MSHA believes that the posting 
requirement is necessary to assure that all miners at a mine will have 
the opportunity to review the proposed plan or revision and provide 
input during the review process. One commenter suggested that proposed 
plans or proposed revisions be required to remain posted for only 30 
days from the time of submittal so as not to ``clutter up the bulletin 
board.'' This suggestion has not been included in the final rule 
because the mine ventilation plan impacts miners'' safety and health 
and it is important for miners to know which plan provisions are in 
effect versus those which have not been approved. Another commenter 
suggested that proposed plans and revisions be posted 10 days prior to 
submittal to MSHA. This recommendation has not been included in the 
final rule to assure that there is no confusion between plans that are 
approved and proposed provisions awaiting MSHA approval. To require 
posting of proposed plan revisions prior to submission to MSHA would 
create another category of mine ventilation plans which could result in 
unnecessary confusion. This is particularly true since the 
representative of miners will have the plan at least 5 days prior to 
submittal. Because there are occasions where a representative of miners 
does not feel it is necessary to review a plan or revision, the rule 
only requires the operator to provide a copy of the plan or revision 
upon request.
    Paragraph (b) of the final rule specifies procedures that the 
representative of miners may use to provide input in the mine 
ventilation plan review process. Under the final rule, the 
representative of miners may 

[[Page 9808]]
submit comments on the proposed plan or revisions to the plan to the 
district manager for consideration. Recognizing that in some instances 
a decision relative to the approval or denial of a revision must be 
made in a short time frame, the final rule requires that comments be 
made in a ``timely manner.'' MSHA has not defined ``timely manner'' but 
would consider it to be a period of time that does not unnecessarily 
delay the approval process. The district manager will continue to be 
available to discuss with the representative of miners all aspects of 
the plan as they affect miners' health and safety at any time during or 
following approval or denial of a proposed plan or revision. Commenters 
suggested that the representative of miners be given a deadline for the 
submission of comments similar to the time frame established in 
paragraph (a)(3)(i) for the operator to provide copies of proposed 
plans and revisions to the representative of mines. In support of this 
recommendation, these commenters stated that unlimited time could 
unnecessarily delay the approval process. This recommendation is not 
included in the final rule due to the complexity of some plans and 
revisions. MSHA's goals are for a process that includes both timely 
review and approval and opportunity for input from miners and the 
Agency believes both goals can be accomplished under the final rule. 
MSHA does not believe that this provision will unnecessarily delay the 
plan approval process since the final rule, like the proposal, requires 
comments to be submitted in a timely manner.
    One commenter suggested that comments submitted by the 
representative of miners to the district manager as part of the plan 
approval process should be provided to the operator. MSHA would expect 
that during the five day period before the plan is submitted to the 
district manager the operator and the representative of miners will 
discuss the plan and inform the other of their respective positions. 
MSHA would encourage the representative of miners to provide a copy of 
their comments to the operator prior to submitting them to MSHA. 
However, to assure that all parties to the plan approval process are 
aware of each others position paragraph (b) of the rule provides that 
the district manager will provide the operator with these comments upon 
request.
    Paragraph (c)(1) of the final rule is unchanged from the proposal 
and retains the existing requirement that the district manager notify 
the operator in writing of the approval or denial of a proposed plan or 
proposed revision. Paragraph (c)(1) adds a requirement that a copy of 
this notification be sent by the district manager to the representative 
of miners. This provision is intended to assure that the representative 
of miners is kept informed of the status of the plan approval. One 
commenter pointed out that quite often, plan provisions are modified 
during the review process and the final approved plan may be different 
from that which was originally submitted. This commenter suggested that 
when a change is made to a submission, the representative of miners 
should be notified of the intended change and afforded the opportunity 
to comment. MSHA agrees that changes to proposed plans do occur during 
the review process. Consistent with MSHA's philosophy that all parties 
to the plan approval process need to be aware of the status of a 
proposed plan or revision, MSHA would expect that the operator would 
inform the representative of miners of changes to the original 
submittal. However, to require that notification be provided for each 
and every change, no matter how minor, could effectively stop the plan 
review and approval process. Therefore, the final rule does not adopt 
the suggestion of the commenter. Some commenters interpreted paragraph 
(c)(1) as requiring the district manager to provide a copy of the 
approved plan to the representative of miners. Paragraph (c)(1) only 
requires that the district manager provide to the representative of 
miners a copy of the notification of approval or denial that is sent to 
the operator.
    Proposed paragraphs (f)(1), (f)(2) and (f)(3) are adopted in the 
final rule. Paragraph (f)(1) is new and requires the operator to 
provide the representative of miners with a copy of the plan or 
revision following notification of approval, if requested. This 
facilitates review of the plan or revision by the representative of 
miners. Also, the final rule continues in paragraphs (f)(2) and (f)(3) 
the existing requirements that the approved plan or revision be made 
available for inspection by the representative of miners and be posted 
on the mine bulletin board. Like the proposal, a new requirement in 
paragraph (f)(3) also requires that an approved plan or revision must 
be posted within 1 working day of notification of the approval and must 
remain posted for the period that the plan is in effect. This helps to 
assure that the miners themselves, as well as the representative of 
miners, are aware of the provisions of the mine ventilation plan once 
it is approved.
    Commenters both supported and opposed paragraph (f). Those in 
opposition suggested that some of the requirements were unnecessary in 
light of other requirements in the standard. Those supporting the rule 
suggested that the operator should be required to provide a copy of the 
approved plan or revision to the representative of miners and to make 
it available within 24 hours of notification of approval. Other 
commenters stated that mine ventilation plan approvals are sometimes 
sent to the company offices and not necessarily to the mine. They 
stated that in these cases, there could be a delay in copies of the 
approved plan or revision reaching the mine. MSHA crafted the final 
rule in light of the existing paragraph (d) which requires that 
operators instruct persons affected by the mine ventilation plan or its 
revision prior to implementation. Changes to the plan do occur during 
the approval process; MSHA would expect that the plan or revision would 
be available to the person conducting the required training and, 
therefore, would be provided to the representative of miners.
    One commenter suggested that, because the approved plan is required 
to be made available for inspection by the representative of miners, 
there is no need for the plan or revision to be posted on the bulletin 
board. This commenter identified some logistical problems associated 
with posting of plans stating that removal of the plan from the 
bulletin board could be a problem.
    This same commenter proposed that notification of the miners of a 
revision to the mine ventilation plan should be the responsibility of 
the representative of miners. MSHA does not agree that making the plan 
available for inspection by the representative of miners is an adequate 
substitute for posting of the plan or revision so as to make it 
available to all miners at all times. Nor does MSHA agree that the 
responsibility for assuring that miners are aware of the requirements 
of the plan is the proper function for the representative of miners. 
MSHA recognizes that difficulties can exist in assuring that the 
approved plan or revision is posted, however the safety benefits of 
having the plan available to the persons affected by its provisions far 
outweigh any logistical problems.

Section 75.371  Mine Ventilation Plan; Contents

    Section 75.371 sets forth the information that the operator must 
include in the mine ventilation plan. Because the plan deals with 
situations 

[[Page 9809]]
unique to a mine, the general rules applicable in other standards do 
not fit. For the convenience of the reader, the standard that sets out 
the general rule or provides for an option to include a provision in a 
plan will generally cross reference to the appropriate paragraph in 
Sec. 75.371.
    MSHA proposed revisions to existing paragraphs (b), (s), (z) and 
(bb) of Sec. 75.371 and reproposed existing paragraph (r). MSHA's final 
rule adopts the proposal for paragraphs (s), (z) and (bb). MSHA revises 
its proposed paragraph (r) to make conforming changes with other 
provisions. Finally, the final rule retains the existing language for 
paragraph (b).
    As stated in the General Discussion section of this preamble, 
provisions concerning the installation and removal of mechanized mining 
equipment that were promulgated in May of 1992 as part of the safety 
standards for underground coal mine ventilation were reproposed in May 
of 1994 as part of this rulemaking for the purpose of receiving and 
giving full consideration to all pertinent comments on this issue. 
Paragraph (r) of the final rule is one of the provisions that was 
reproposed. Section 75.325(d) of the final rule requires that areas 
where mechanized mining equipment, including longwall equipment, is 
being installed and removed be ventilated. Paragraph (r) of Sec. 75.371 
requires that the quantity of air that will be provided be included in 
the mine ventilation plan. Most commenters either supported the 
provision, citing the explosion at the William Station Mine, or stated 
that the standard was originally promulgated inappropriately and did 
not substantively comment on the requirement. One commenter suggested 
that the quantity of air specified in the plan under paragraph (r) 
should represent the minimum quantity that will be provided and the 
location specified should be identified as what would be typical so as 
to give the mine the flexibility to adapt to varying mine conditions. 
This recommendation is consistent with MSHA's intent and MSHA has 
included it in the final rule to help clarify the rule.
    One commenter suggested that the ventilation scheme shown in the 
plan should be representative of the method of ventilation to be used. 
MSHA agrees that the mine ventilation plan should include a method of 
ventilation that is representative of that used in the mine. However, 
MSHA has not adopted this suggestion since the plan must be specific 
enough so that the operator, the miners, the representative of miners, 
and MSHA are assured that all areas are being adequately ventilated.
    Paragraph (r) of the final rule requires that the mine ventilation 
plan include the location where air quantities will be provided, and 
the ventilation controls that will be used to provide these quantities. 
This language was included in the reproposed provision and in 
Sec. 75.325(d), which requires that the quantity of air that will be 
provided during the installation and removal of mechanized mining 
equipment, the location where this quantity will be provided, and the 
ventilation controls that will be used, be included in the mine 
ventilation plan. In reproposing paragraph (r), MSHA inadvertently 
excluded from Sec. 75.371(r) the requirement relative to the location 
where the air quantity is provided. The final rule has been modified in 
Sec. 75.371(r) to conform to the requirements of Sec. 75.325(d).
    The final rule revises existing paragraph (s) to conform to changes 
in Sec. 75.362(d)(1)(iii). The final rule deletes the portion of 
existing Sec. 75.362(d)(2) which requires that the mine ventilation 
plan include the location of tests which are to be made closer to the 
working face than the last permanent roof supports using extendable 
probes or other acceptable means. The final rule in paragraph 
(d)(1)(iii) requires that the mine ventilation plan specify the 
frequency and location of the methane tests if required more often than 
20 minutes by Sec. 75.362(d)(1)(iii). One commenter suggested adding 
the words, ``or at other locations and frequencies if approved by the 
district manager and contained in the ventilation plan.'' The suggested 
clarification is not necessary and has not been adopted in the final 
rule.
    The final rule revises paragraph (z) to conform to Sec. 75.364(a). 
Section 75.364(a) addresses the measurements to be made to evaluate the 
effectiveness of bleeder systems and the ventilation of worked-out 
areas during the weekly examination. The final rule requires that the 
locations where these measurements are made or alternative methods of 
providing these evaluations be included in the mine ventilation plan. 
One commenter suggested that the locations where air measurements are 
made should not be required in the mine ventilation plan. The commenter 
made a similar suggestion relative to the requirement in Sec. 75.364 
that air measurements be made to evaluate the ventilation of worked-out 
areas and determine the effectiveness of bleeder systems. According to 
the commenter, since no specific air volume is required it is not 
necessary to measure the volume present. The measurement of air 
quantity, as well as the other measurements required by the existing 
standard, are essential to evaluate the ventilation of worked-out areas 
and determine the effectiveness of bleeder systems. The final rule, 
therefore, does not include the suggested changes in either Sec. 75.364 
or Sec. 75.371(z).
    Another commenter suggested that since the current standards do not 
require a specific volume of air in bleeder entries, it is unnecessary 
to measure the air volume. Proper evaluation of the effectiveness of a 
bleeder system can only be achieved by comparison of measurements taken 
in the bleeder system. In most instances, one of the most important 
measurements is the air quantity at strategic points in the bleeder 
system. Therefore, the final rule includes the proposed requirement 
that the locations where air quantity measurements will be made in the 
bleeder system be specified in the mine ventilation plan.
    Existing paragraph (bb) requires that the location of ventilating 
devices used to control air movement through worked-out areas be 
included in the mine ventilation plan. The final rule reinstates a 
requirement contained in the previous regulation, that the location and 
sequence of construction of proposed seals also be indicated. This 
requirement is consistent with Sec. 75.334(e) which requires that the 
sequence of construction of seals be specified in the mine ventilation 
plan. Some commenters on paragraph (bb) and Sec. 75.334(e) suggested 
that proper sequencing of seals can change due to mining conditions and 
should not be made a part of the mine ventilation plan. Another 
commenter suggested that because the time to get a plan approved can be 
lengthy, it may even create unnecessary hazards. Proper sequencing of 
seal construction is necessary for effective ventilation during 
sealing. Therefore, the final rule requires the location and sequence 
of the construction of seals be specified and approved in the mine 
ventilation plan. If a delay in seal construction will result in a 
hazard to miners, the review and approval of the plan can be expedited 
as explained in the preamble discussion of Sec. 75.370.
    One commenter on paragraph (bb) suggested that the locations of 
stoppings, regulators, and bleeder connector entries are better shown 
on the mine map with a notation that it is subject to approval under 
Sec. 75.371. The existing standard permits appropriate information 
required under Sec. 75.371 to be shown on the map required by 
Sec. 75.372. This is explained in the preamble discussion for existing 
Sec. 75.371. MSHA recognizes that some of 

[[Page 9810]]
the information required to be submitted under Sec. 75.371 is best 
shown on a map. Rather than require additional maps, this information 
may be shown on the Sec. 75.372 map. When shown on the Sec. 75.372 map, 
only that portion of the map that contains information required under 
Sec. 75.371 is subject to approval by the district manager.
    The proposal would have revised paragraph (b) to reflect the 
proposed changes in paragraphs (c) and (d) of Sec. 75.312 allowing 
alternative testing methods for main mine fan automatic closing doors 
and fan signals. Because the final rule does not include the proposed 
changes to Sec. 75.312(c) and (d), final rule Sec. 75.371(b) conforms.

Section 75.372  Mine Ventilation Map

    The mine ventilation map provides a basis for understanding how a 
particular coal mine is ventilated. An accurate and up to date map of 
the mine enables the operator and MSHA to review the mine's ventilation 
plan to determine the appropriateness of the ventilation system to the 
conditions in the mine. Only through a thorough understanding of the 
ventilation system can the operator and others determine whether the 
system is capable of preventing methane accumulations, possible 
explosions, and high levels of respirable dust. Generally, Sec. 75.372 
requires that the necessary information be provided on the map.
    The final rule revises existing paragraph (b)(3) and adds new 
paragraphs (b)(19) and (b)(20). Paragraph (b)(3) addresses which 
adjacent workings must be shown on the mine map. The final rule, like 
the proposal, requires all known adjacent workings within 1,000 feet of 
existing or projected mine workings to be shown on the mine map, 
regardless of whether the workings are located on mine property or on 
adjacent property. The existing rule required that only the adjacent 
workings within 1,000 feet be shown if they are on mine property.
    MSHA has concluded that it is necessary to require that the mine 
ventilation map include all known workings located in the same coalbed 
within 1,000 feet of existing or projected workings, regardless of 
whether the workings are located on the mine property. Hazards, such as 
methane and water accumulations and irrespirable atmospheres, exist in 
old workings whether located on mine property or not. MSHA also notes 
that this revision makes paragraph (b)(3) consistent with existing 
paragraph (h) of Sec. 75.1200, Mine map. Paragraph (h) of Sec. 75.1200 
requires that the mine map show all adjacent mine workings within 1,000 
feet. Like the previous standard, this revision would assure that all 
adjacent mine workings appear on the Sec. 75.372 map in those cases 
where operators do not use a Sec. 75.1200 map for their required 
submission.
    One commenter suggested that this requirement not be included 
because mine operators have no legal obligation or authority to force 
an adjacent land owner to provide the required information. MSHA 
recognizes that the mine operator may, in some instances, have 
difficulty obtaining this information. The hazards that exist within 
abandoned mines, however, warrant such a requirement. Additionally, as 
noted previously, this requirement is consistent with the requirements 
of Sec. 75.1200(h) and will, therefore, impose no additional burden on 
the operator. Agency experience reveals that the existing standard, 
Sec. 75.1200(h), has not proven to be practically difficult for 
compliance. In addition, this information would be available to the 
miners and would enhance their understanding of the ventilation system 
and aid them in the event of an emergency.
    Another commenter suggested that the rule explicitly require that 
all mine workings, including workings from auger mining, highwall 
mining and strip mining, be shown on the map. This recommendation has 
not been included in the final rule because MSHA believes that the 
final rule is clear and requires any workings from other mines, such as 
strip, auger and similar workings, to be shown if they are in the same 
coalbed and are within 1,000 feet of existing or projected mine 
workings.
    Proposed paragraph (b)(19) is adopted in the final rule. The 
proposal was drafted in response to comments received at public 
meetings. It reinstates the requirement in the previous standard that 
the mine map include the entry height, velocity and direction of the 
air current at or near the midpoint of each belt flight where the 
height and width of the entry are representative of the belt haulage 
entry. Paragraph (b)(19) of the final rule should assist the examiner 
in rapidly determining whether the air is flowing in its normal 
velocity and direction during examination of the belt entry required 
elsewhere in subpart D. One commenter suggested that this requirement 
is redundant because the mine ventilation plan already requires that 
this be ``illustrated''. MSHA does not agree that the requirement is 
redundant since there is no such requirement in the mine ventilation 
plan.
    MSHA emphasizes that like much of the information required to be 
shown on the ventilation map, this information would not be subject to 
approval. When shown on the Sec. 75.372 map, only that portion of the 
map that contains information required under Sec. 75.371 is subject to 
approval by the district manager. The information required by paragraph 
(b)(19) does not fit this criteria and therefore is not subject to 
approval by the district manager.
    As explained in the discussion of Sec. 75.301, instances have 
developed where operators direct air from an intake air course to 
ventilate shops, electrical installations, or for other purposes, and 
this air is then coursed to the surface and is not used to ventilate 
working places. Under one interpretation of the existing definition, 
because this air has not ventilated a working place or a worked-out 
area, the air course cannot be considered a return air course. In these 
instances, the final rule in Sec. 75.301 expressly permits the 
redesignation of the affected portion of the air course as a return air 
course. Because it is important that personnel, including examiners, 
the miners' representative, and representatives of the Secretary, know 
which air courses have been redesignated, the final rule requires that 
these air courses be shown on the map. Paragraph (b)(20) requires that 
the location of redesignated air courses be shown on the ventilation 
map. Commenters were supportive of this provision.

Section 75.380  Escapeways; Bituminous and Lignite Mines

    When a fire, explosion or other emergency necessitates an immediate 
evacuation of a mine, the designated route for miners to leave the mine 
is the escapeway. The escapeway should be appropriately located and 
designed to be free of obstructions and hazards to assure safe passage 
from the hazardous underground environment. The final rule addresses 
requirements for escapeways. Paragraphs (b)(1) and (b)(2) set forth the 
requirements for the location of the escapeway when installing and 
removing mechanized mining equipment. Paragraphs (d)(3) through (d)(5) 
deal with the minimum dimensions of escapeways. Paragraph (f) addresses 
the equipment that can be used in escapeways and the requirements for 
fire suppression systems on this equipment. Finally, paragraph (i) sets 
the minimum slope of an escapeway.
    The final rule republishes existing paragraphs (b)(1) and (b)(2) 
and revises paragraph (d)(3) through (d)(5), (f) and (i)(2).
    Sections 75.380 (b)(1) and (b)(2) of the final rule deal with 
escapeways on 

[[Page 9811]]
working sections and areas where mechanized mining equipment is being 
installed or removed. MSHA adopts the proposal in the final rule. An 
in-depth discussion of the proposal of provisions concerning the 
installation and removal of mechanized mining equipment is presented in 
the General Discussion section of this preamble.
    MSHA specifically solicited comments on those portions of the 
proposal dealing with the installation and removal of mechanized mining 
equipment, including paragraphs (b)(1) and (b)(2) of Sec. 75.380. These 
paragraphs require that an escapeway be provided to areas where 
mechanized mining equipment is being installed or removed. Only one 
substantive comment was received. The commenter suggested that the 
location of the beginning of the escapeway during equipment 
installation and removal should be specified in the mine ventilation 
plan to minimize the potential for congestion during movement of heavy 
equipment. The commenter stated that the proposal would eliminate all 
access to a longwall during the installation or removal of the longwall 
equipment except for the face crosscut, and lead to accidents.
    MSHA believes that the location where the loading point will be 
installed and where the loading point was last located prior to removal 
are easily identifiable and offer the best choice. The suggestion of 
the commenter has not been adopted in the final rule. In addition, the 
commenter noted that mobile equipment was needed during the 
installation and removal of longwalls; this equipment can be used in 
the escapeway if properly attended and protected with proper fire 
suppression.
    As with the existing rule, paragraph (d)(3) of the final rule 
generally requires escapeways to be maintained to a height of 5 feet 
from the mine floor to the mine roof, excluding the thickness of any 
roof support. To accommodate mines in low seams, the rule provides that 
where the coalbed is less than 5 feet, the escapeways shall be 
maintained at least to the height of the coalbed. As in the past, 
convergence, the reduction in entry height due to roof sag or floor 
heave, which occurs as a natural geologic process, will be excluded 
when determining escapeway height unless it would impede the escape of 
miners, including disabled persons, in the event of an emergency. The 
final rule modifies (d)(3) to provide that in areas of mines where 
escapeways pass through doors or in areas of mines developed before 
November 16, 1992 where escapeways pass across or under overcasts or 
undercasts, the height of the escapeway may be less than 5 feet 
provided the height is sufficient to enable miners, including disabled 
persons, to escape quickly in an emergency. It was brought to the 
attention of MSHA by one commenter that in some instances the removal 
of roof support or the lowering of the tops of overcasts may be 
necessary to provide the 5-foot height required by the existing rule. 
It has been suggested that this could result in a diminution of safety.
    One commenter suggested that escapeways should be 6 feet in width 
and 5 feet in height without exception. This suggestion has not been 
adopted in the final rule. Under the previous rule, escapeway 
dimensions were addressed through criteria and operators routinely 
requested and received approval for lesser dimensions than that in 
criteria based on a performance test referred to as a ``stretcher 
test.'' As applied, this test required 4 persons to carry a fifth 
person on a stretcher through the area in question. The purpose of the 
``stretcher test'' was to demonstrate that the lesser dimension would 
not delay escape. The final rule permits lesser escapeway heights and 
widths under specific circumstances provided the height and width 
maintained enable miners to escape quickly in an emergency. The final 
rule requires that when there is a need to determine whether sufficient 
height or width is provided, MSHA may require a stretcher test where 4 
persons carry a miner through the area in question on a stretcher.
    This commenter suggested that the results of a stretcher test could 
be manipulated by having the most fit miners carry the smallest miner. 
MSHA continues to believe that the stretcher test is appropriate. 
MSHA's experience is that the stretcher test provides a good measure of 
the ability of miners to escape.
    Since the escape of miners is not impeded, the demonstration that 
there is no delay in escape assures that there is no reduction in 
safety.
    MSHA received similar comments regarding the dimensions of 
escapeways developed on or after November 16, 1992, (the effective date 
of the existing rule). Commenters suggested that where these escapeways 
pass across or under overcasts or undercasts, the height of the 
escapeway should be permitted to be less than 5 feet provided the 
height is sufficient to enable miners, including disabled persons, to 
escape quickly in an emergency situation. This suggestion is not 
adopted in the final rule since sufficient clearance should have been 
provided in these escapeways through proper planning and engineering. 
Also, MSHA's experience does not reveal any compliance problems 
associated with the standards since November 1992.
    One commenter recommended changing the phrase ``disabled persons'' 
in paragraph (d)(3) to ``injured persons.'' In support of this 
recommendation, the commenter stated that the phrase is intended to 
include persons who may be injured but not necessarily disabled. MSHA 
does not believe that the change is needed since there are many 
situations that occur underground that can result in a person being 
injured but not severely enough to need assistance (i.e. disabled) to 
be transported from the mine. An escapeway that will permit the 
transport of disabled persons, i.e. the more severely injured persons, 
can be expected to accommodate persons with lesser injuries. The term 
disabled with respect to the concept of injured has existed in the 
regulations for over 25 years and MSHA is not aware of any problems 
with its use.
    Questions arose during informational meetings regarding the 
requirements for the height of doors in escapeways. The final rule, 
like the proposal, permits door heights of less than 5 feet under 
certain conditions. Under the previous rule, escapeway dimensions, 
including door heights, were addressed through criteria and operators 
routinely requested and received approval for lesser dimensions than 
that in criteria based on a performance test referred to as a 
``stretcher test.'' Under the final rule, door heights of less than 5 
feet are permitted provided the operator can demonstrate that persons, 
including disabled persons, can escape without delay. The method of 
demonstration would be the stretcher test, the same as for the 
escapeway. Additionally, there are normally few doors in an escapeway 
and the distance traversed in a door is very short. Passing the 
stretcher test assures that there would be no diminution of safety 
under the new provision. Also, since significant pressure differentials 
can exist in escapeways, doors which are less than 5 feet are easier to 
open.
    Paragraph (d)(4) of the existing rule requires the escapeways be 
maintained at least 6 foot wide with some exceptions. Widths of less 
than 6 feet are permitted in either the primary or the alternate 
escapeway in instances where supplemental roof support is necessary and 
where the route of travel passes through doors or other permanent 
ventilation controls. In both cases, existing paragraph (d)(4) requires 
that the escapeway be at least 4 feet wide. Under the final rule, 
paragraph (d)(4)(iii) permits the alternate 

[[Page 9812]]
escapeway to be less than 4 feet wide under certain conditions.
    Paragraph (d)(4)(iii) applies to the alternate escapeway only and 
allows the escapeway width to be less than 4 feet for the same 
conditions addressed in paragraphs (i) and (ii) if it can be 
demonstrated that sufficient width is maintained to enable persons, 
including disabled persons, to escape quickly in an emergency. The 
conditions that could warrant lesser widths are the locations where the 
alternate escapeway passes through doors or other permanent ventilation 
controls, including constructed approaches to permanent ventilation 
controls and facilities addressed in paragraph (d)(6), or where 
supplemental roof support is required.
    One commenter stated that the alternate escapeway should be 
maintained at a minimum width of 4 feet without exception and noted 
that on several occasions miners have been forced to use the alternate 
escapeway in emergencies. The commenter noted that it could be 
difficult to transport an injured person on a stretcher at widths under 
4 feet. The final rule requires that when there is a need to determine 
whether adequate width is provided, the stretcher test would be 
applied.
    Under the previous rule, approval had been granted for reduced 
escapeway widths based on the stretcher test. These approvals were due 
to the need to provide additional roof support and, in some cases, the 
need for passage through ventilation controls. Additionally, as newer 
portions of a mine age and require additional roof support, the final 
rule allows widths of less than 4 feet in the alternate escapeway where 
this roof support exists, provided the stretcher test is passed. MSHA 
believes this approach achieves the intended result of the standard 
while at the same time addressing the safety issues of providing 
necessary supplemental roof support and permitting travel in the 
alternate escapeway.
    The preamble to the proposal stated that under the existing 
standard Sec. 75.380(d)(4) mobile equipment should not be considered 
when determining escapeway width unless the equipment has been 
permanently abandoned in the escapeway or would be obstructing the 
escapeway for a significant portion of a shift. Commenters objected 
that this interpretation would be unduly restrictive and impractical. 
Commenters noted that certain parked mobile equipment would enhance 
miner safety where the equipment could be used to transport people out 
of the mine in the event of an emergency.
    Experience under the existing and the previous rule indicates that 
track-mounted and rubber-tired equipment which could be used for 
evacuation should be excluded when determining escapeway widths. Track-
mounted supply cars enhance safety by providing a readily available 
supply of rock dust, roof support material, and other essential safety 
related material. Section 75.214 requires that a supply of 
supplementary roof support material and the tools and equipment 
necessary to install the materials be available at a readily accessible 
location on each working section or within 4 crosscuts of each working 
section. In contrast, the Agency received comments that escapeways 
should be maintained at least 6 feet in width except in rare cases 
where roof supports could reduce the width to no less than 4 feet over 
a limited distance.
    The final rule takes a practical approach, preserving the 
requirement that escapeways must be of sufficient width to enable 
miners, including disabled persons, to escape quickly in an emergency. 
The final rule also recognizes that certain necessary mining and 
transportation equipment is located on and near working sections. For 
example, necessary supply cars containing safety related material like 
rock dust, roof support, ventilation control construction material, 
etc., is allowable. Additionally, longwall section equipment commonly 
includes, but may not be limited to, starter box, water pump, section 
belt tailpiece and takeup assembly, section transformer, and emulsion 
pump. Because this equipment is necessary to the operation of the 
longwall, it also is permitted to be in the escapeway near the working 
section under the final rule. In continuous miner sections as well as 
longwall sections, mantrips and personnel transportation equipment, 
which could be utilized in an emergency evacuation, is allowable. The 
final rule would not prohibit this equipment in escapeway entries on or 
near working sections. The rule would require, however, that sufficient 
clearance be maintained to permit rapid escape.
    This aspect of the final rule maintains the historical approach 
taken to addressing issues of clearance in the confined environment of 
underground coal mines. The final rule, while permitting reduced 
dimensions near working sections as discussed above, requires that the 
escapeways always be maintained of sufficient width to enable miners, 
including disabled persons, to escape quickly in an emergency. As 
discussed elsewhere in this preamble, the Agency will assess the 
adequacy of escapeway widths in such areas by means of the stretcher 
test to assure that the width is sufficient to enable miners, including 
disabled persons, to escape quickly in an emergency.
    Like the proposal, the final rule in paragraph (d)(5) revises the 
existing language dealing with the location of escapeways. It provides 
that escapeways shall be located to follow the most direct, safe and 
practical route to the nearest mine opening suitable for the safe 
evacuation of miners. A question arose during an informational meeting 
as to whether MSHA intended that the existing rule eliminate the 
requirement that escapeways be routed to the ``nearest mine opening.'' 
It was not MSHA's intent to change this requirement from the previous 
standard. The existing requirement that the escapeway follow the most 
direct route to the surface would, in fact, require the route to go to 
the nearest mine opening. However, to eliminate any confusion that may 
exist, the final rule revises paragraph (d)(5) and adopts language 
similar to that in previous regulation, Sec. 75.1704-2(a), that is, 
that the escapeway must follow the most direct, safe and practical 
route to the nearest mine opening suitable for the safe evacuation of 
miners.
    One commenter stated that escapeways should not be permitted to 
pass an opening to be routed to a more distant opening. Another 
commenter stated that the nearest mine opening may not always be the 
safest due to roof conditions or other factors. MSHA acknowledges that 
the nearest mine opening may not always be the safest route to the 
surface. A number of factors affect whether or not the safest, most 
direct, practical route has been selected. These factors include roof 
conditions, travel h
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
eight, fan location, physical dimensions of the 
mine opening, and similar considerations. For example, if bad roof 
conditions are present along the shortest direct route and those roof 
conditions are beyond reasonable control, then an alternate ``safe'' 
route designated by the mine operator may be appropriate. However, the 
presence of roof falls does not necessarily indicate that the 
passageway would not be suitable for evacuation if it is reasonable to 
rehabilitate the area. By way of another example, where coal seam 
thickness varies to the extreme, the shortest route may be through 
lower coal, making travel relatively slow and difficult. An alternate 
route through a high passageway may permit easier travel. Such an 
alternate route, although longer, may be more practical and therefore 
may be more appropriate. 

[[Page 9813]]
Similarly, there can be other instances where the ``nearest mine 
opening'' may not be suitable for safe evacuation of miners. For 
example, an old mine shaft may not be safe for travel because of badly 
deteriorated conditions, such as a deteriorated shaft lining or 
deteriorated timbers, even though the shaft is still suitable for mine 
ventilation purposes.
    As with the existing standard, mine development projections do not 
have to be altered to provide additional rooms, entries, or crosscuts 
for the sole purpose of providing a passageway to the nearest mine 
opening. However, the construction of ventilation controls such as 
stoppings, overcasts and undercasts, or the installation of an escape 
facility may be required to provide the most direct, safe and practical 
route to the surface.
    One commenter suggested that MSHA should require an escapeway plan 
to be approved by the MSHA district manager to assure the most direct 
route to the surface. Existing standards require that escapeways be 
shown on the ventilation map. In addition, as with other regulations, 
inspectors assess whether escapeways follow the most direct, safe and 
practical route to the surface during each regular inspection. 
Accordingly, MSHA does not believe that an additional plan is 
necessary.
    Existing paragraph (f) establishes the requirements for ventilation 
of the primary escapeway and identifies which equipment can be operated 
in the primary escapeway and the fire suppression requirements for this 
equipment. The final rule, like the proposal, modifies paragraph (f) to 
explicitly identify the equipment that is not permitted in the primary 
escapeway and to specify the types of fire suppression systems that are 
to be used and the conditions under which each is to be used on 
equipment permitted in the primary escapeway. This is done by replacing 
existing paragraphs (f)(1) and (f)(2) with paragraphs (f)(1) through 
(f)(7) in the final.
    Existing paragraph (f)(1) requires that one escapeway that is 
ventilated with intake air be designated as the primary escapeway and 
prohibits certain equipment from being used in the primary escapeway in 
areas developed after November 15, 1992. Further, paragraph (f)(1) 
requires fire suppression systems on mobile equipment that is operated 
in the primary escapeway. The final rule transfers the part of existing 
paragraph (f)(1) that specifies the area of the primary escapeway 
affected to paragraph (f)(2).
    The existing rule limited the installation or use of certain 
equipment in areas of the primary escapeway developed after November 
15, 1992. Paragraph (f)(2) of the final rule modifies the existing rule 
for clarity and expands the application of certain requirements 
contained in paragraphs (f)(3) through (f)(7) to the entire primary 
escapeway except those areas of the primary escapeway developed prior 
to March 30, 1970 where separation of the primary escapeway from the 
belt and trolley haulage entries did not exist as of November 16, 1992. 
For areas of mines developed after September 15, 1992, (those areas 
covered by the existing rule) the provisions of paragraphs (f)(3) 
through (f)(7) will be effective as of March 11, 1997. For other areas 
covered by the rule, MSHA has provided for a 1 year phase in period to 
allow mine operators time to effectively plan and implement the 
necessary changes. The phase in period applies to areas of a primary 
escapeway developed between March 30, 1970 and November 16, 1992, and 
to areas of the primary escapeway developed prior to March 30, 1970 
where separation of the belt and trolley haulage entries from the 
primary escapeway existed prior to November 16, 1992.
    Paragraph (f)(3) prohibits certain equipment from being in the 
primary escapeway. Paragraphs (f)(4) and (f)(5) deal with fire 
protection for mobile equipment that is permitted in the primary 
escapeway and paragraph (f)(6) addresses a specific circumstance when 
mobile equipment may operate in a primary escapeway without a fire 
suppression system. Paragraph (f)(7), a provision added to the proposed 
language in response to comments, allows the use of designated 
emergency vehicles or ambulances in the primary escapeway.
    One commenter suggested that the final rule should not provide an 
exception for all areas where separation of the primary escapeway from 
the belt and trolley haulage entry does not exist. The commenter 
recognized, however, that Congress granted an exemption from separation 
requirements for areas of the primary escapeway developed prior to 
March 30, 1970, the effective date of the Act. The intent of the 
proposal was to provide an exemption from the requirements of proposed 
paragraphs (f)(3) through (f)(6) for these same areas. The commenter 
points out that the proposal would have extended the exemption to other 
areas of the primary escapeway where, for one reason or another, 
separation did not exist on November 16, 1992, the effective date of 
the existing rule. The final rule modifies the proposal to clarify that 
the exemption only applies to those areas of the escapeway that were 
developed prior to March 30, 1970 and where separation did not exist on 
November 16, 1992.
    Another commenter correctly interpreted proposed paragraph (f)(2) 
as extending the requirement that limits the types of equipment 
permitted in primary escapeways to areas of the mine developed prior to 
November 16, 1992. The commenter stated that the proposed regulation 
would pose great cost to the industry with no appreciable safety 
benefit derived. A review of the fire history relative to both 
stationary and mobile equipment indicates that fires can and do occur 
on this equipment. Mobile equipment by design is intended to provide 
flexibility in movement and is capable of operating anywhere in the 
mine. Although the accident reports do not specify whether the mobile 
equipment that caught fire was in the primary escapeway when the fire 
started, it is reasonable to conclude that at least some of these fires 
did occur in the primary escapeway. MSHA continues to believe that 
given the importance of the primary escapeway to the safety of miners, 
the extension of the requirements for operation of equipment in the 
primary escapeway is necessary and appropriate.
    Paragraph (f)(3) lists the equipment that is not permitted in the 
primary escapeway. Under paragraph (f)(3)(i) of the final rule, 
operating diesel equipment without an automatic fire suppression system 
is prohibited in the primary escapeway unless it is attended, except as 
provided in paragraphs (f)(6) and (f)(7). One commenter stated that 
attended diesel equipment with a manual fire suppression system 
presents no fire hazard. Another commenter suggested that unattended 
diesel equipment should be prohibited. When diesel equipment is 
operated in the primary escapeway and is properly attended and equipped 
with a manual fire suppression system, the equipment operator can 
immediately respond to a fire, and the safety afforded by the existing 
standard is maintained. If the machine is shut off, however, attendance 
is not necessary. When diesel equipment is to be operated unattended, 
an automatic system is required to protect against fire.
    One commenter stated that ``attended'' should be interpreted to 
mean that the operator is on or within sight of the vehicle. Another 
commenter urged that the standard be clarified to require that the 
operator be at the controls of the equipment. For the purposes of 
Sec. 75.380(f), by ``attended'' MSHA means that the equipment operator 
would be on the mobile 

[[Page 9814]]
equipment or immediately adjacent to the equipment and be capable of 
activating the fire suppression system in the event of a fire.
    The existing standard permits equipment to be in the escapeway for 
purposes of transporting miners and materials and for maintaining the 
escapeway but does not expressly prohibit the haulage of coal in the 
primary escapeway. As a matter of clarification, the final rule 
specifically prohibits coal haulage in the primary escapeway unless 
incidental to cleanup and maintenance of the escapeway. One commenter 
supported the proposed prohibition of coal haulage noting that coal 
haulage would provide a ready source of fuel to a machinery-initiated 
fire. Several commenters expressed a concern that incidental coal 
haulage associated with cleanup and maintenance of the primary 
escapeway would be prohibited under the proposed standard. Cleanup and 
maintenance of the primary escapeway must be permitted. Therefore, the 
final rule modifies the proposal to permit mobile equipment to haul 
coal if incidental to cleanup and maintenance of the primary escapeway.
    Paragraph (f)(3)(iii) prohibits compressors in the primary 
escapeway except as provided in subparagraphs (f)(3)(iii) (A) through 
(C). Subparagraph (A) allows compressors necessary to maintain the 
escapeway in safe, travelable condition; (B) allows compressors that 
are components of equipment such as locomotives and rock dusting 
machines; and, (C) allows compressors of less than five horsepower due 
to the limited fire hazard associated with their operation.
    One commenter described an incident involving a compressor in an 
intake airway, which was located in a fireproof enclosure but was 
improperly ventilated. According to the commenter, smoke and 
contaminants spread throughout the intake entry and reached the 
section, which was then evacuated. This illustrates the importance of 
providing adequate protection from the possible spread of smoke and 
contaminants associated with compressor fires or overheating.
    Paragraph (f)(3)(iv) of the final rule adds battery chargers to the 
equipment included in the proposal that is permitted in the primary 
escapeway provided they are located on or near a working section and 
moved as the section advances or retreats. In all other respects, 
paragraph (f)(3)(iv) of the final rule adopts the proposal. Under 
paragraph (f)(3)(iv), underground transformer stations, battery 
charging stations, substations, and rectifiers cannot be located in the 
primary escapeway except: (A) where necessary to maintain the escapeway 
in safe, travelable condition; and (B) battery chargers and rectifiers 
and power centers with transformers that are either dry-type or contain 
nonflammable liquid, provided they are located on or near a working 
section and are moved as the section advances or retreats. The first 
exception allows work to be performed in the primary escapeway to 
assure its integrity. The second provides for the locations of the 
described equipment at or near working sections if the equipment moves 
with the section. Equipment at or near working sections will normally 
be within a few crosscuts of the working face. In many cases, 
particularly with battery chargers, there may be no practical 
alternative to locating this equipment in the escapeway. In addition, 
Sec. 75.340 provides additional protection when using underground 
electrical equipment.
    Paragraph (f)(3)(v) of the final rule adopts the proposal and 
prohibits water pumps from being in the primary escapeway except as 
provided under paragraphs (f)(3)(v)(A) through (f)(3)(v)(F). The pumps 
that are permitted in the primary escapeway are the same ones that are 
excepted from the requirements of Sec. 75.340 due to the low potential 
for fire associated with their operation. They include: water pumps 
necessary to maintain the escapeway in safe, travelable condition; 
submersible pumps; permissible pumps and associated permissible 
switchgear; pumps located on or near a working section that are moved 
as the section advances or retreats; pumps installed in anthracite 
mines; and small portable pumps. While the existing rule refers to the 
electrical equipment described in Sec. 75.340 (a) and (b)(1), the final 
rule, like the proposal, lists the affected equipment for the 
convenience of the reader. Like Sec. 75.340, paragraph (f)(3)(v) 
applies to water pumps and emulsion pumps when they are located on or 
near the working section and are moved as the section advances or 
retreats. One commenter agreed that pumps may be necessary to maintain 
and rehabilitate the primary escapeway but suggested that a time limit 
be placed on the length of time the pump is allowed to remain in the 
escapeway. MSHA believes that specific conditions at the mine will 
govern the amount of time required for any necessary pumping. 
Therefore, MSHA has not included the suggestion in the final rule since 
the decision relative to time must be made on a case-by-case basis, as 
appropriate.
    Paragraph (f)(4) of the final rule adopts MSHA's proposal with one 
change. As proposed, paragraph (f)(4) would have required the use of 
fire suppression systems on mobile equipment operated in the primary 
escapeway, and would have allowed exceptions for continuous miners and 
as provided in Sec. 75.380 (f)(5) and (f)(6). The final rule adds an 
additional exception for emergency vehicles or ambulances as provided 
in Sec. 75.380(f)(7). Unlike the existing standard, the final rule in 
paragraph (f)(4) permits certain mobile equipment operated in the 
primary escapeway to be protected with a manual fire suppression system 
instead of an automatic system, provided it is attended by a person 
trained in the use and operation of the fire suppression system. MSHA 
believes that when a piece of equipment is operated in the primary 
escapeway and is properly attended and equipped with a manual fire 
suppression system, the equipment operator can immediately respond to 
the situation, and the safety afforded by the existing standard is 
maintained.
    One commenter stated that no electrical, battery or diesel 
equipment, or other equipment such as compressors should be allowed in 
the primary escapeway, except for the purpose of maintenance of the 
escapeway, and that this equipment should have an appropriate fire 
suppression system. Because travel in the escapeway in certain mining 
systems is essential for safety given the design of the mining system 
used, the recommendation of the commenter has not been adopted in the 
final rule. Instead, the final rule provides that certain types of 
mining equipment can be operated in the primary escapeway provided the 
safety precautions set out in the standard are followed. One commenter 
stated that the rule should only apply to mobile equipment which is 
operated in the primary escapeway, since equipment not operating 
presents little or no hazard. MSHA agrees and has incorporated this 
clarification into the final rule.
    Commenters indicated that it is sometimes necessary to withdraw 
face equipment, such as continuous miners, roof bolting machines and 
shuttle cars, into the primary escapeway for a short distance beyond 
the loading point. The equipment is sometimes parked and left there on 
down shifts or between shifts. MSHA notes that, as clarified, the final 
rule does not prohibit this practice. Because the equipment would be 
attended when operated and is provided with manual fire suppression, 
the 

[[Page 9815]]
equipment may be operated in the primary escapeway.
    Following promulgation of the existing rule, some persons construed 
the requirement for an automatic fire suppression system to apply to 
electric face equipment. As explained in the preamble to the proposal, 
this was not the intent of MSHA. To clarify its intent, MSHA issued 
Program Policy Letter No. P92-V-4 on November 16, 1992, addressing the 
operation and location of equipment in primary escapeways. Under 
existing regulations in Subpart L--Fire Protection, face equipment is 
required to be protected by a manual fire suppression system. The final 
rule recognizes and generally conforms with this requirement. Other 
than for an exception to permit a situation such as the movement of 
continuous mining machines between sections without a continuous water 
supply, the final rule requires that when face machinery, equipped with 
a manual fire suppression system, is operated in the primary escapeway, 
it must be attended by a person trained in the proper function and use 
of the fire suppression system. The continuous mining machine exception 
recognizes that the fire suppression system for the continuous mining 
machine often relies on a water supply that may be impracticable to 
provide during equipment moves.
    The final rule requires in paragraph (f)(4) that with exceptions 
for continuous mining machines and as provided in paragraphs (f)(5), 
(f)(6), and (f)(7), each piece of mobile equipment operated in primary 
escapeways shall: (1) be equipped with manually operated fire 
suppression systems installed in compliance with Secs. 75.1107-3 
through 75.1107-16 and be attended continuously; or (2) be equipped 
with an automatic fire suppression system that is capable of both 
automatic and manual activation and installed in compliance with 
Secs. 75.1107-3 through 75.1107-16. Fire suppression systems which were 
installed to meet the 1992 rule will continue to be accepted.
    Under paragraph (f)(5) of the final rule, personnel carriers and 
small personnel conveyances designed and used solely for the 
transportation of personnel and small hand tools can be operated in the 
primary escapeway if either of the requirements under paragraphs (i) or 
(ii) are met. This class of equipment would not include diesel-powered 
pickup trucks, for example, which would be governed by paragraph 
(f)(4). Paragraph (i) requires a multipurpose dry chemical type 
automatic fire suppression system capable of both manual and automatic 
activation. Paragraph (ii) provides an alternative for a class of 
small, battery powered, golf cart type, equipment used for transport of 
persons and small hand tools. In this case, fire extinguishers may be 
used in lieu of a fire suppression system.
    Commenters questioned the need for automatic systems on the class 
of equipment consisting of small, battery powered, golf cart type 
equipment. One commenter suggested that a manual fire suppression 
system should be accepted. After a review of the issue, MSHA has 
concluded that some types of mobile equipment present a very limited 
fire hazard. In the case of small, battery operated, golf cart type, 
conveyances designed and used for the transport of personnel and small 
hand tools, considering the limited hazard, a trained operator provided 
with two 10 pound multi-purpose dry chemical fire extinguishers is 
equivalent in protection to a fire suppression system. Accordingly, as 
an alternative under paragraph (ii), small battery powered, golf cart 
type, equipment may be operated in the primary escapeway if provided 
with two 10 pound multi-purpose dry chemical fire extinguishers. Unlike 
diesel powered equipment, the golf cart type of equipment is shut off 
when not operating and, therefore, attendance is not an issue. The 10 
pound units are standard size extinguishers and are appropriate for the 
equipment involved.
    The system used in accordance with paragraph (i) must be suitable 
for the intended application and listed or approved by a nationally 
recognized independent testing laboratory. The language was proposed as 
two paragraphs but has been combined in the final rule under paragraph 
(i) and an alternative has been added as paragraph (ii). The types of 
machinery which fall under paragraph (f)(5) are not required to meet 
the additional requirements of Secs. 75.1107-3 through 75.1107-16. For 
example, it would be impractical and would not enhance safety to apply 
the minimum dry chemical poundage requirements of Sec. 75.1107-9 to 
small equipment designed and used solely for personnel and small hand 
tools.
    During informational meetings, it was suggested that the term ``dry 
chemical'' would be more accurate and appropriate than the term ``dry 
powder'' used in the existing standard. Like the proposal, the final 
rule adopts this language. MSHA received no comments on this proposed 
revision
    Paragraph (f)(6) of the final rule provides an exception to the 
general requirement and allows mobile equipment not provided with a 
fire suppression system to operate in the primary escapeway if no 
persons are inby other than persons directly engaged in the use or 
moving of the equipment. This provision of the final rule allows for 
the necessary movement of face equipment, such as between sections.
    One commenter stated that the exemption provided in (f)(6) should 
be expanded to allow equipment that does not have a fire suppression 
system to be relocated provided monitoring equipment is utilized for 
carbon monoxide or smoke and two-way communication is available to 
notify appropriate persons. The final rule does not adopt this 
suggestion. During moves, equipment is often laboring at maximum 
capacity and there can be several machines operating simultaneously. 
Under these conditions, equipment fires can develop quickly and the 
products of combustion would be carried to inby workers by the 
ventilating current. By permitting only workers who are directly 
engaged in the operation or movement of the equipment, the final rule 
prevents other workers from being exposed to the hazards of a fire on 
the equipment being moved. Workers operating or engaged in moving the 
equipment will be in a position to quickly identify the hazard and take 
necessary action.
    Another commenter objected to the provision stating that fire 
suppression should be required on all equipment in the primary 
escapeway. This suggestion has not been adopted in the final rule. MSHA 
does not agree that fire suppression is needed when no persons are inby 
or downstream of the equipment being moved. MSHA has concluded that 
either these machines should be equipped with fire suppression, or fire 
extinguishers as in (f)(5)(ii), or no persons should be inby the 
location where the equipment is being operated except those persons 
directly engaged in the operation or movement of the equipment.
    Another commenter suggested that the wording of (f)(6) could be 
read to allow miners to work on a longwall face while equipment not 
equipped with fire suppression is operated anywhere in the primary 
escapeway. This is not permitted by the standard. By including the 
phrase, ``. . . except those persons directly engaged in using or 
moving the equipment'', the persons affected are only those persons in 
the immediate vicinity of the machine. With no persons working inby, 
the use of machinery without a fire suppression system would not expose 
persons to the hazard of toxic gases and fumes from a fire on the 
equipment. The language 

[[Page 9816]]
also would not permit persons to operate mobile equipment without a 
fire suppression system in the primary escapeway while miners are 
downstream working on a longwall face. The controlling factor is 
whether the persons inby are directly engaged in using or moving that 
particular piece of equipment. If they are, and no one else is inby, 
the equipment may be operated without a fire suppression system. For 
example, when moving a longwall shield, no one would be permitted to be 
inby the machine being used to move the shield if the machine is not 
provided with a fire suppression system except those persons moving the 
shield. This would include miners operating other pieces of equipment 
to move other shields.
    Paragraph (f)(7) modifies the existing rule to include a new 
exemption to the requirement that mobile equipment operated in primary 
escapeways have a fire suppression system. Paragraph (f)(7) permits 
mobile equipment designated and used only as emergency vehicles or 
ambulances to operate in the primary escapeway without fire suppression 
systems. It was suggested to MSHA that certain types of emergency 
equipment, such as diesel powered ambulances, should be exempt from the 
requirements for fire suppression systems. Comments were received 
suggesting that ambulances should be exempt because space is extremely 
limited on these vehicles and because they are used infrequently. MSHA 
recognizes the potential benefit in the use of this type of equipment. 
Another commenter objected, foreseeing potential abuses of the 
exemption by mine operators who would designate equipment as ambulances 
but use it as ordinary equipment. The final rule permits emergency 
vehicles to be operated in the primary escapeway without fire 
suppression systems only when this equipment is used for medical 
emergencies.
    This existing rule requires in paragraph (i)(2) that mechanical 
escape facilities be provided and maintained for, ``. . . each slope 
that is part of a designated escapeway that is either inclined 18 
degrees or more from the horizontal or is inclined 9 degrees or more 
from the horizontal and is greater than 1,000 feet in length.'' During 
informational meetings, MSHA became aware of a concern that existing 
paragraph (i)(2) would permit slopes of significant length and 
inclination to exist without any mechanical escape facilities. An 
example would be a slope of 900 feet inclined less than 18 degrees from 
the horizontal. It was suggested that such a slope could be 
particularly difficult for passage of injured persons under cold and 
icy conditions if mechanical escape facilities were not provided. In 
light of this concern, MSHA proposed to require that mechanical escape 
facilities be provided and maintained from the coal seam to the surface 
for each slope that is part of a designated escapeway and is inclined 
more than 9 degrees from the horizontal. The final rule adopts the 
proposal.
    One commenter objected to proposed paragraph (i)(2) indicating that 
facilities are unnecessary in low angle slopes which are of short 
length. Other commenters believed that the 1992 standard was 
appropriate. Another commenter indicated support for the proposal as a 
way to enable persons to escape quickly in an emergency. This commenter 
also noted that escape can be very difficult in icy winter conditions 
in some slopes. After consideration of the comments received, MSHA 
concludes that the proposal was appropriate and the final rule adopts 
this aspect of the proposal.
    One commenter suggested that proposed paragraph (i)(2) could be 
interpreted as requiring mechanical escape facilities for slopes that 
occur naturally underground. It was not MSHA's intent to apply 
paragraph (i)(2) to slopes other than from the coal seam to the 
surface. The final rule clarifies this and requires that mechanical 
escape facilities be provided for each slope from the coal seam to the 
surface that is part of a designated escapeway and is inclined more 
than 9 degrees from the horizontal.
    Like the proposal, the final rule in paragraph(d)(5) revises the 
existing language dealing with the location of escapeways. It provides 
that escapes shall be located to follow the most direct, safe and 
practical route to the nearest mine opening suitable for the safe 
evacuation of miners. A question arose during an informational meeting 
as to whether MSHA intended that the existing rule eliminate the 
requirement that escapeways be routed to the ``nearest mine opening.'' 
It was not MSHA's intent to change this requirement from the previous 
standard. The existing requirement that the escapeway follow the most 
direct route to the surface would, in fact, require the route to go to 
the nearest mine opening. However, to eliminate any confusion that may 
exist, the final rule revises paragraph (d)(5) and adopts language 
similar to that in previous regulation, Sec. 75.1704-2(a), that is, 
that the escapeway must follow the most direct, safe and practical 
route to the nearest mine opening suitable for the safe evacuation of 
miners.
    One commenter stated that escapeways should not be permitted to 
pass an opening to be routed to a more distant opening. Another 
commenter stated that the nearest mine opening may not always be the 
safest due to roof conditions or other factors. MSHA acknowledges that 
the nearest mine opening may not always be the safest route to the 
surface. A number of factors affect whether or not the safest, most 
direct, practical route has been selected. These factors include roof 
conditions, travel height, fan location, physical dimensions of the 
mine opening, and similar considerations. For example, if bad roof 
conditions are present along the shortest direct route and those roof 
conditions are beyond reasonable control, then an alternate ``safe'' 
route designated by the mine operator may be appropriate. However, the 
presence of roof falls does not necessarily indicate that the 
passageway would not be suitable for evacuation if it is reasonable to 
rehabilitate the area. By way of another example, where coal seam 
thickness varies to the extreme, the shortest route may be through 
lower coal, making travel relatively slow and difficult. An alternate 
route through a high passageway may permit easier travel. Such an 
alternate route, although longer, may be more practical and therefore 
may be more appropriate. Similarly, there can be instances where the 
``nearest mine opening'' may not be suitable for safe evacuation of 
miners. For example, an old mine shaft may not be safe for travel 
because of badly deteriorated conditions, such as a deteriorated shaft 
lining or deteriorated timbers, even though the shaft is still suitable 
for mine ventilation purposes.
    As with the existing standard, mine development projections do not 
have to be altered to provide additional rooms, entries, or crosscuts 
for the sole purpose of providing a passageway to the nearest mine 
opening. However, the construction of ventilation controls such as 
stoppings, overcasts and undercasts, or the installation of an escape 
facility may be required to provide the most direct, safe and practical 
route to the surface.
    One commenter suggested that MSHA should require an escapeway plan 
to be approved by the MSHA district manager to assure the most direct 
route to the surface. Existing standards require that escapeways be 
shown on the ventilation map. In addition, as with other regulations, 
inspectors assess whether escapeways follow the most direct, safe and 
practical route to the surface during each regular inspection. 
Accordingly, MSHA does not believe that an additional plan is 
necessary. 

[[Page 9817]]

    Existing paragraph (f) establishes the requirements for ventilation 
of the primary escapeway and identifies which equipment can be operated 
in the primary escapeway and the fire suppression requirements for this 
equipment. The final rule, like the proposal, modifies paragraph (f) to 
explicitly identify the equipment that is not permitted in the primary 
escapeway and to specify the types of fire suppression systems that are 
to be used and the conditions under which each is to be used on 
equipment permitted in the primary escapeway. This is done by replacing 
existing paragraphs (f)(1) and (f)(2) with paragraphs (f)(1) through 
(f)(7) in the final.
    Existing paragraph (f)(1) requires that one escapeway that is 
ventilated with intake air be designated as the primary escapeway and 
prohibits certain equipment from being used in the primary escapeway in 
areas developed after November 15, 1992. Further, paragraph (f)(1) 
requires fire suppression systems on mobile equipment that is operated 
in the primary escapeway. The final rule transfers the part of existing 
paragraph (f)(1) that specifies the area of the primary escapeway 
affected to paragraph (f)(2).
    The existing rule limited the installation or use of certain 
equipment in areas of the primary escapeway developed after November 
15, 1992. Paragraph (f)(2) of the final rule modifies the existing rule 
for clarity and expands the application of certain requirements 
contained in paragraphs (f)(3) through (f)(7) to the entire primary 
escapeway except those areas of the primary escapeway developed prior 
to March 30, 1970 where separation of the primary escapeway from the 
belt and trolley haulage entries did not exist as of November 16, 1992. 
For areas of mines developed after September 15, 1992, (those areas 
covered by the existing rule) the provisions of paragraphs (f)(3) 
through (f)(7) will be effective as of March 11, 1997. For other areas 
covered by the rule, MSHA has provided for a 1 year phase in period to 
allow mine operators time to effectively plan and implement the 
necessary changes. The phase in period applies to areas of a primary 
escapeway developed between March 30, 1970 and November 16, 1992, and 
to areas of the primary escapeway developed prior to March 30, 1970 
where separation of the belt and trolley haulage entries from the 
primary escapeway existed prior to November 16, 1992.
    Paragraph (f)(3) prohibits certain equipment from the primary 
escapeway. Paragraphs (f)(4) and (f)(5) deal with fire protection for 
mobile equipment that is permitted in the primary escapeway and 
paragraph (f)(6) addresses a specific circumstance when mobile 
equipment may operate in a primary escapeway without a fire suppression 
system. Paragraph (f)(7), a provision added to the proposed language in 
response to comments, allows the use of designated emergency vehicles 
or ambulances in the primary escapeway.
    One commenter suggested that the final rule should not provide an 
exception for all areas where separation of the primary escapeway from 
the belt and trolley haulage entry does not exist. The commenter 
recognized, however, that Congress granted an exemption from separation 
requirements for areas of the primary escapeway developed prior to 
March 30, 1970, the effective date of the Act. The intent of the 
proposal was to provide an exemption from the requirements of proposed 
paragraphs (f)(3) through (f)(6) for these same areas. The commenter 
points out that the proposal would have extended the exemption to other 
areas of the primary escapeway where, for one reason or another, 
separation did not exist on November 16, 1992, the effective date of 
the existing rule. The final rule modifies the proposal to clarify that 
the exemption only applies to those areas of the escapeway that were 
developed prior to March 30, 1970 and where separation did not exist on 
November 16, 1992.
    Another commenter correctly interpreted proposed paragraph (f)(2) 
as extending the requirement that limits the types of equipment 
permitted in primary escapeways to areas of the mine developed prior to 
November 16, 1992. The commenter stated that the proposed regulation 
would pose great cost to the industry with no appreciable safety 
benefit derived. A review of the fire history relative to both 
stationary and mobile equipment indicates that fires can and do occur 
on this equipment. Mobile equipment by design is intended to provide 
flexibility in movement and is capable of operating anywhere in the 
mine. Although the accident reports do not specify whether the mobile 
equipment that caught fire was in the primary escapeway when the fire 
started, it is reasonable to conclude that at least some of these fires 
did occur in the primary escapeway. MSHA continues to believe that 
given the importance of the primary escapeway to the safety of miners, 
the extension of the requirements for operation of equipment in the 
primary escapeway is appropriate.
    Paragraph (f)(3) lists the equipment that is not permitted in the 
primary escapeway. Under paragraph(f)(3)(i) of the final rule, 
operating diesel equipment without an automatic fire suppression system 
is prohibited in the primary escapeway unless it is attended, except as 
provided in paragraphs (f)(6) and (f)(7). One commenter stated that 
attended diesel equipment with a manual fire suppression system 
presents no fire hazard. Another commenter suggested that unattended 
diesel equipment should be prohibited. When diesel equipment is 
operated in the primary escapeway and is properly attended and equipped 
with a manual fire suppression system, the equipment operator can 
immediately respond to a fire, and the safety afforded by the existing 
standard is maintained. If the machine is shut off, however, attendance 
is not necessary. When diesel equipment is to be operated unattended, 
an automatic system is required to protect against fire.
    One commenter stated that ``attended'' should be interpreted to 
mean that the operator is on or within sight of the vehicle. Another 
commenter urged that the standard be clarified to require that the 
operator be at the controls of the equipment. For the purposes of 
Sec. 75.380(f), by ``attended'' MSHA means that the equipment operator 
would be on the mobile equipment or immediately adjacent to the 
equipment and be capable of activating the fire suppression system 
immediately in the event of a fire.
    The existing standard permits equipment to be in the escapeway for 
purposes of transporting miners and materials and for maintaining the 
escapeway but does not expressly prohibit the haulage of coal in the 
primary escapeway. As a matter of clarification, the final rule 
specifically prohibits coal haulage in the primary escapeway unless 
incidental to cleanup and maintenance of the escapeway. One commenter 
supported the proposed prohibition of coal haulage noting that coal 
haulage would provide a ready source of fuel to a machinery-initiated 
fire. Several commenters expressed a concern that incidental coal 
haulage associated with cleanup and maintenance of the primary 
escapeway would be prohibited under the proposed standard. Cleanup and 
maintenance of the primary escapeway must be permitted. Therefore, the 
final rule modifies the proposal to permit mobile equipment to haul 
coal if incidental to cleanup and maintenance of the primary escapeway.
    Paragraph (f)(3)(iii) prohibits compressors in the primary 
escapeway except as provided in subparagraphs (f)(3)(iii) (A) through 
(C). Subparagraph 

[[Page 9818]]
(A) allows compressors necessary to maintain the escapeway in safe, 
travelable condition; (B) allows compressors that are components of 
equipment such as locomotives and rock dusting machines; and, (C) 
allows compressors of less than five horsepower due to the limited fire 
hazard associated with their operation.
    One commenter described an incident involving a compressor in an 
intake airway, which was located in a fireproof enclosure but was 
improperly ventilated. According to the commenter, smoke and 
contaminants spread throughout the intake entry and reached the 
section, which was then evacuated. This illustrates the importance of 
providing adequate protection from the possible spread of smoke and 
contaminants associated with compressor fires or overheating.
    Paragraph (f)(3)(iv) of the final rule adds battery chargers to the 
equipment included in the proposal that is permitted in the primary 
escapeway provided it is located on or near a working section and is 
moved as the section advances or retreats. In all other respects, 
paragraph (f)(3)(iv) of the final rule adopts the proposal. Under 
paragraph (f)(3)(iv), underground transformer stations, battery 
charging stations, substations, and rectifiers cannot be located in the 
primary escapeway except: (A) where necessary to maintain the escapeway 
in safe, travelable condition; and (B) battery chargers and rectifiers 
and power centers with transformers that are either dry-type or contain 
nonflammable liquid, provided they are located on or near a working 
section and are moved as the section advances or retreats. The first 
exception allows work to be performed in the primary escapeway to 
assure its integrity. The second provides for the locations of the 
described equipment at or near working sections if the equipment moves 
with the section. Equipment at or near working sections will normally 
be within a few crosscuts of the working face. In many cases, 
particularly with battery chargers, there may be no practical 
alternative to locating this equipment in the escapeway. In addition, 
Sec. 75.340 provides additional protection when using underground 
electrical equipment.
    Paragraph (f)(3)(v) of the final rule adopts the proposal and 
prohibits water pumps from being in the primary escapeway except as 
provided under paragraphs (f)(3)(v)(A) through (f)(3)(v)(F). The pumps 
that are permitted in the primary escapeway are the same ones that are 
excepted from the requirements of Sec. 75.340 due to the low potential 
for fire associated with their operation. They include: water pumps 
necessary to maintain the escapeway in safe, travelable condition; 
submersible pumps; permissible pumps and associated permissible 
switchgear; pumps located on or near a working section that are moved 
as the section advances or retreats; pumps installed in anthracite 
mines; and small portable pumps. While the existing rule refers to the 
electrical equipment described in Sec. 75.340 (a) and (b)(1), the final 
rule, like the proposal, lists the affected equipment for the 
convenience of the reader. Like Sec. 75.340, paragraph (f)(3)(v) 
applies to water pumps and emulsion pumps when they are located on or 
near the working section and are moved as the section advances or 
retreats. One commenter agreed that pumps may be necessary to maintain 
and rehabilitate the primary escapeway but suggested that a time limit 
be placed on the length of time the pump is allowed to remain in the 
escapeway. MSHA believes that specific conditions at the mine will 
govern the amount of time required for any necessary pumping. 
Therefore, MSHA has not included the suggestion in the final rule since 
the decision relative to time must be made on a case-by-case basis, as 
appropriate.
    Paragraph (f)(4) of the final rule adopts MSHA's proposal with one 
change. As proposed, paragraph (f)(4) would have required the use of 
fire suppression systems on mobile equipment operated in the primary 
escapeway, and would have allowed exceptions for continuous miners and 
as provided in Sec. 75.380(f)(5)and (f)(6). The final rule adds an 
additional exception for emergency vehicles or ambulances as provided 
in Sec. 75.380(f)(7). Unlike the existing standard, the final rule in 
paragraph (f)(4) permits certain mobile equipment operated in the 
primary escapeway to be protected with a manual fire suppression system 
instead of an automatic system, provided it is continuously attended by 
a person trained in the use and operation of the fire suppression 
system. MSHA believes that when a piece of equipment is operated in the 
primary escapeway and is properly attended and equipped with a manual 
fire suppression system, the equipment operator can immediately respond 
to the situation, and the safety afforded by the existing standard is 
maintained.
    One commenter stated that no electrical, battery or diesel 
equipment, or other equipment such as compressors should be allowed in 
the primary escapeway, except for the purpose of maintenance of the 
escapeway, and that this equipment should have an appropriate fire 
suppression system. Because travel in the escapeway in certain mining 
systems is essential for safety given the design of the mining system 
used, the recommendation of the commenter has not been adopted in the 
final rule. Instead, the final rule provides that certain types of 
mining equipment can be operated in the primary escapeway provided the 
safety precautions set out in the standard are followed. One commenter 
stated that the rule should only apply to mobile equipment which is 
operated in the primary escapeway, since equipment not operating 
presents little or no hazard. MSHA agrees and has incorporated this 
clarification into the final rule.
    Commenters indicated that it is sometimes necessary to withdraw 
face equipment, such as continuous miners, roof bolting machines and 
shuttle cars, into the primary escapeway for a short distance beyond 
the loading point. The equipment is sometimes parked and left there on 
down shifts or between shifts. MSHA notes that, as clarified, the final 
rule does not prohibit this practice. Because the equipment would be 
attended when operated and is provided with manual fire suppression, 
the equipment may be operated in the primary escapeway.
    Following promulgation of the existing rule, some persons construed 
the requirement for an automatic fire suppression system to apply to 
electric face equipment. As explained in the preamble to the proposal, 
this was not the intent of MSHA. To clarify its intent, MSHA issued 
Program Policy Letter No. P92-V-4 on November 16, 1992, addressing the 
operation and location of equipment in primary escapeways. Under 
existing regulations in Subpart L--Fire Protection, face equipment is 
required to be protected by a manual fire suppression system. The final 
rule recognizes and generally conforms with this requirement. Other 
than for an exception to permit a situation such as the movement of 
continuous mining machines between sections without a continuous water 
supply, the final rule requires that when face machinery, equipped with 
a manual fire suppression system, is operated in the primary escapeway, 
it must be attended by a person trained in the proper function and use 
of the fire suppression system. The continuous mining machine exception 
recognizes that the fire suppression system for the continuous mining 
machine often relies on a water supply that may be impracticable to 
provide during equipment moves. 

[[Page 9819]]

    The final rule requires in paragraph (f)(4) that with exceptions 
for continuous mining machines and as provided in paragraphs (f)(5), 
(f)(6), and (f)(7), each piece of mobile equipment operated in primary 
escapeways shall: (1) be equipped with manually operated fire 
suppression systems installed in compliance with Secs. 75.1107-3 
through 75.1107-16 and be attended continuously; or (2) be equipped 
with an automatic fire suppression system that is capable of both 
automatic and manual activation and installed in compliance with 
Secs. 75.1107-3 through 75.1107-16.
    Under paragraph (f)(5) of the final rule, personnel carriers and 
small personnel conveyances designed and used solely for the 
transportation of personnel and small hand tools can be operated in the 
primary escapeway if either of the requirements under paragraphs (i) or 
(ii) are met. Paragraph (i) requires a multipurpose dry chemical type 
automatic fire suppression system capable of both manual and automatic 
activation. Paragraph (ii) provides an alternative for a class of 
small, battery powered, golf cart type, equipment used for transport of 
persons and small hand tools. In this case, fire extinguishers may be 
used in lieu of a fire suppression system.
    Commenters questioned the need for automatic systems on the class 
of equipment consisting of small, battery powered, golf cart type 
equipment. One commenter suggested that a manual fire suppression 
system should be accepted. After a review of the issue, MSHA has 
concluded that some types of mobile equipment present a very limited 
fire hazard. In the case of small, battery operated, golf cart type, 
conveyances designed and used for the transport of personnel and small 
hand tools, considering the limited hazard, a trained operator provided 
with two 10 pound multi-purpose dry chemical fire extinguishers is 
equivalent in protection to a fire suppression system. Accordingly, as 
an alternative under paragraph (ii), small battery powered, golf cart 
type, equipment may be operated in the primary escapeway if provided 
with two 10 pound multi-purpose dry chemical fire extinguishers. Unlike 
diesel powered equipment, the golf cart type of equipment is shut off 
when not operating and, therefore, attendance is not an issue. The 10 
pound units are standard size extinguishers and are appropriate for the 
equipment involved.
    The system used in accordance with paragraph (i) must be suitable 
for the intended application and listed or approved by a nationally 
recognized independent testing laboratory. The language was proposed as 
two paragraphs but has been combined in the final rule under paragraph 
(i) and an alternative has been added as paragraph (ii). The types of 
machinery which fall under paragraph (f)(5) are not required to meet 
the additional requirements of Secs. 75.1107-3 through 75.1107-16. For 
example, it would be impractical and would not enhance safety to apply 
the minimum dry chemical poundage requirements of Sec. 75.1107-9 to 
small equipment designed and used solely for personnel and small hand 
tools.
    During informational meetings, it was suggested that the term ``dry 
chemical'' would be more accurate and appropriate than the term ``dry 
powder'' used in the existing standard. Like the proposal, the final 
rule adopts this language. MSHA received no comments on this proposed 
revision.
    Paragraph (f)(6) of the final rule provides an exception to the 
general requirement and allows mobile equipment not provided with a 
fire suppression system to operate in the primary escapeway if no 
persons are inby other than persons directly engaged in the use or 
moving of the equipment. This provision of the final rule allows for 
the necessary movement of face equipment, such as between sections.
    One commenter stated that the exemption provided in (f)(6) should 
be expanded to allow equipment that does not have a fire suppression 
system to be relocated provided monitoring equipment is utilized for 
carbon monoxide or smoke and two-way communication is available to 
notify appropriate persons. The final rule does not adopt this 
suggestion. During moves, equipment is often laboring at maximum 
capacity and there can be several machines operating simultaneously. 
Under these conditions, equipment fires can develop quickly and the 
products of combustion would be carried to inby workers by the 
ventilating current. By permitting only workers who are directly 
engaged in the operation or movement of the equipment, the final rule 
prevents other workers from being exposed to the hazards of a fire on 
the equipment being moved. Workers operating or engaged in moving the 
equipment will be in a position to quickly identify the hazard and take 
necessary action.
    Another commenter objected to the provision stating that fire 
suppression should be required on all equipment in the primary 
escapeway. This suggestion has not been adopted in the final rule. MSHA 
does not agree that fire suppression is needed when no persons are inby 
or downstream of the equipment being moved. MSHA has concluded that 
either these machines should be equipped with fire suppression, or fire 
extinguishers as in (f)(5)(ii), or no persons should be inby the 
location where the equipment is being operated except those persons 
directly engaged in the operation or movement of the equipment.
    Another commenter suggested that the wording of (f)(6) could be 
read to allow miners to work on a longwall face while equipment not 
equipped with fire suppression is operated anywhere in the primary 
escapeway. This is not permitted by the standard. By including the 
phrase, ``* * * except those persons directly engaged in using or 
moving the equipment'', the persons affected are only those persons in 
the immediate vicinity of the machine. With no persons working inby, 
the use of machinery without a fire suppression system would not expose 
persons to the hazard of toxic gases and fumes from a fire on the 
equipment. The language also would not permit persons to operate mobile 
equipment without a fire suppression system in the primary escapeway 
while miners are downstream working on a longwall face. The controlling 
factor is whether the persons inby are directly engaged in using or 
moving that particular piece of equipment. If they are, and no one else 
is inby, the equipment may be operated without a fire suppression 
system. For example, when moving a longwall shield, no one would be 
permitted to be inby the machine being used to move the shield if the 
machine is not provided with a fire suppression system except those 
persons moving the shield. This would include miners operating other 
pieces of equipment to move other shields.
    Paragraph (f)(7) modifies the existing rule to include a new 
exemption to the requirement that mobile equipment operated in primary 
escapeways have a fire suppression system. Paragraph (f)(7) permits 
mobile equipment designated and used only as emergency vehicles or 
ambulances to operate in the primary escapeway without fire suppression 
systems. It was suggested to MSHA that certain types of emergency 
equipment, such as diesel powered ambulances, should be exempt from the 
requirements for fire suppression systems. Comments were received 
suggesting that ambulances should be exempt because space is extremely 
limited on these vehicles and because they are used infrequently. MSHA 
recognizes the potential benefit in the use of this type of equipment. 
Another commenter objected, foreseeing potential abuses of 

[[Page 9820]]
the exemption by mine operators who would designate equipment as 
ambulances but use it as ordinary equipment. The final rule permits 
emergency vehicles to be operated in the primary escapeway without fire 
suppression systems only when this equipment is used only for medical 
emergencies.
    This existing rule requires in paragraph (i)(2) that mechanical 
escape facilities be provided and maintained for, ``. . . each slope 
that is part of a designated escapeway that is either inclined 18 
degrees or more from the horizontal or is inclined 9 degrees or more 
from the horizontal and is greater than 1,000 feet in length.'' During 
informational meetings, MSHA became aware of a concern that existing 
paragraph (i)(2) would permit slopes of significant length and 
inclination to exist without any mechanical escape facilities. An 
example would be a slope of 900 feet inclined less than 18 degrees from 
the horizontal. It was suggested that such a slope could be 
particularly difficult for passage of injured persons under cold and 
icy conditions if mechanical escape facilities were not provided. In 
light of this concern, MSHA proposed to require that mechanical escape 
facilities be provided and maintained from the coal seam to the surface 
for each slope that is part of a designated escapeway and is inclined 
more than 9 degrees from the horizontal. The final rule adopts the 
proposal.
    One commenter objected to proposed paragraph (i)(2) indicating that 
facilities are unnecessary in low angle slopes which are of short 
length. Other commenters believed that the 1992 standard was 
appropriate. Another commenter indicated support for the proposal as a 
way to enable persons to escape quickly in an emergency. This commenter 
also noted that escape can be very difficult in icy winter conditions 
in some slopes. After consideration of the comments received, MSHA 
concludes that the proposal was appropriate and the final rule adopts 
this aspect of the proposal.
    One commenter suggested that proposed paragraph (i)(2) could be 
interpreted as requiring mechanical escape facilities for slopes that 
occur naturally underground. It was not MSHA's intent to apply 
paragraph (i)(2) to slopes other than from the coal seam to the 
surface. The final rule clarifies this and requires that mechanical 
escape facilities be provided for each slope from the coal seam to the 
surface that is part of a designated escapeway and is inclined more 
than 9 degrees from the horizontal.
Section 75.382  Mechanical Escape Facilities
    Because an escapeway route can sometimes be very long, the most 
safe, direct and practical route to the surface can sometimes involve 
the use of a mechanical escape device such as an automatic elevator or 
similar, but less sophisticated, device. Section 75.382 contains the 
requirements for mechanical escape facilities installed in escapeways 
under Sec. 75.380 and Sec. 75.381. The final rule contains a new 
requirement for certification of escape facility examinations, proposed 
as paragraph (g). The final rule does not retain the other proposed 
changes, paragraphs (h) and (i), that would have added recordkeeping 
and countersigning requirements.
    Under paragraph (g) of the final rule, the designated examiner 
certifies by date, time, and initials that the mechanical escape 
facilities examination required by paragraph Sec. 75.382(c) was 
performed. The certification must be located at or near the facility 
examined. Certification has long been an accepted practice in the 
mining industry for assuring that a required examination has been 
completed. One commenter agreed that certification is necessary and 
supported the revision. The commenter indicated that the facilities are 
often designated as escapeways and therefore there should be some 
assurance that the facilities have been examined and are ready for use. 
Also, in the case of mechanical escape facilities, if certification is 
not provided, precious time could be lost as the escape facility is 
tested prior to use to determine if it is functional and safe.
    Under the proposed paragraphs (h) and (i), a record would have had 
to be made of the examination of the escape facility performed in 
accordance with Sec. 75.382 (c). The results of the examination would 
be included in a record, including any deficiency found along with the 
corrective actions taken to correct the condition. One commenter 
supported the revision requiring records of deficiencies found during 
examinations as well as a record of corrective actions. Other 
commenters objected to additional records, noting that they would not 
enhance safety. After review of the comments, MSHA has concluded that 
certification will achieve the intended objective of assuring the 
safety of mechanical escape. Accordingly, the recordkeeping 
requirements proposed as paragraphs (h) and (i) are omitted from the 
final rule.
    One commenter stated that many companies utilize mobile escape 
facilities to cover more than one mine if the mines are located in 
close proximity. The commenter believed that such an arrangement was 
not considered in the countersigning provisions of the proposal and 
stated, ``The effort required to go to each mine every week and track 
down the mine foreman would be burdensome and unnecessary.'' Paragraph 
(c) of the existing rule requires a weekly examination and a weekly 
test in which the hoist must be run through one complete cycle of 
operation to determine that it is operating properly. The final rule 
requires certification to be completed by the examiner. As indicated 
above, MSHA has concluded that certification will achieve the intended 
objective of assuring that the examinations have been conducted.
    Additional comments were received recommending further 
modifications and additions to Sec. 75.382. For example, a commenter 
recommended 2-way communication capability, with supplies and a holding 
area at the escape facility. These types of comments related to issues 
outside the scope of the rulemaking and were not addressed. Another 
commenter would have MSHA reinstate language from an earlier rule, 
alleging a reduction in protection. MSHA does not believe that there is 
a reduction in protection. Also, the final rule did not propose to 
change the existing requirement that the commenter claimed reduced 
protection, i.e., that a person trained to operate the mechanical 
escape facility always shall be available. MSHA notes that this issue 
is outside the scope of the rulemaking.
Section 75.383  Escapeway Maps and Drills
    When a fire, explosion or other emergency necessitates an immediate 
evacuation of a mine the designated route for miners to leave the mine 
is the escapeway. During a mine fire, passageways, even those 
designated as escapeways, can become smoke filled and the ability to 
see can be drastically reduced. Therefore, it is vitally important that 
miners know the route of travel through the escapeway. Section 75.383 
provides for the posting of escapeway maps so that they are available 
for miners to study and use during an emergency, if necessary. Section 
75.383 also provides for miners to be trained in the escape route 
through escapeway drills. Escapeway drills in mines are similar to fire 
drills in schools and high rise buildings.
    Existing paragraphs (a) and (b)(1) of Sec. 75.383 deal with the 
escapeway map and drill requirements in areas where mechanized mining 
equipment is being 

[[Page 9821]]
installed or removed. Based on comments received, the final rule 
contains 2 revisions to the proposal. The first allows the mine map to 
be readily accessible as an alternative to posting. The second requires 
that miners who are underground when any change is made to the 
escapeway map be immediately notified of the change. These revisions to 
the proposal are discussed below.
    One commenter supported the requirements of (a) and (b)(1) noting 
the hazards and activities where mechanized mining equipment is being 
installed or removed. Another commenter stated that the requirement 
that the map be ``posted'' is impractical in some mines. The commenter 
stated that the rule should simply require that the map be maintained 
on the section to allow the map to be maintained in a map tube, or be 
covered. The commenter also indicated that a map tube could aid miners 
in a rapid escape since the map and tube could easily be taken with the 
miners during the escape. MSHA agrees that the maintenance of a posted 
map could be difficult in some conditions such as in wet or very low 
height mines. Accordingly, the final rule provides an option wherein 
the map may be either posted or be maintained in a location readily 
accessible to all miners. In specifying ``readily accessible'' MSHA 
intends that all miners be made aware of the map location and have 
access to review the map at any time. As an example, a map secured in a 
locked tool chest would not be acceptable.
    One commenter objected to paragraph (a) in two respects. First, 
according to the commenter, the standard does not require maps to show 
the revised escapeway routes until the end of the shift on which the 
changes are made. The commenter believes that changes are projected in 
advance and therefore the maps should be updated immediately. Second, 
the commenter indicated that the requirement that miners must be 
informed of the changes before entering the mine does not address 
affected miners already underground. Many changes within escapeways are 
not known or planned well in advance. Often, such revisions are in 
response to changing conditions underground. MSHA does not believe that 
allowing a portion of one shift is an excessive amount of time to 
update the maps. MSHA does agree, however, that changes to the 
escapeways should be immediately brought to the attention of all miners 
who are underground at the time of a change. Accordingly, the final 
rule specifies that all affected miners already underground must be 
immediately notified of the change. This will assure that all affected 
miners are aware of the change from the time the change is implemented.
    While agreeing that each miner's familiarity with escapeways is 
important, one commenter stated that requiring travel by foot in the 
escapeways could cause undue physical stress to some miners in low or 
steeply pitching seams. The commenter continued that the desired result 
could be obtained by requiring full participation in drills where 
transportation is provided and full participation in drills where 
transportation is not provided, unless that escapeway is equipped with 
a continuous, directional life line. MSHA notes that the standard does 
not require travel on foot. Transportation may be used for escapeway 
drills provided that the purpose of the standard can be achieved. That 
purpose is to assure that miners are familiar with the escapeway routes 
and, as specified in (b)(4), before or during practice escapeway 
drills, miners shall be informed of the locations of fire doors, check 
curtains, changes in the routes of travel, and plans for diverting 
smoke from escapeways. Traveling an escapeway in a completely enclosed 
mantrip, such that the route could not be observed, would not meet the 
requirement. As to the concept of exempting drills in the alternate 
escapeway where mechanized transportation is unavailable if a 
directional lifeline exists, MSHA believes that certain minimum 
specifications for lifelines would be needed before such a compliance 
alternative could be considered. This would expand the scope of this 
rulemaking beyond the proposal.
    One commenter suggested an expansion of 75.383 to require: 
directional life lines in both escapeways; communications in both 
escapeways; numbering of all stoppings along escapeways; additional 
SCSR caches; hard hat stickers depicting escapeways and SCSR donning 
procedures; and other measures. While many of the suggestions may have 
merit, they are outside the scope of this rulemaking.
    In the proposal, MSHA solicited comments on a concept to allow 
individual miners to opt out of escapeway drills for health reasons. 
One commenter indicated that a number of additional requirements would 
be needed to assure that any miners opting out would still remain 
familiar with the escapeways. After considering the comments received, 
MSHA has not included an option for miners to opt out of the escapeway 
drills. As one commenter pointed out, it is essential that each miner 
be familiar with the escapeways. MSHA concludes that a number of 
accommodations can be made to provide assistance to any miner 
experiencing difficulty during drills. As discussed above, mobile 
equipment may be used provided that the conveyance is not so enclosed 
that miners cannot observe the route. Operators can allow additional 
time for miners who may encounter difficulty. Also, assistance can be 
provided by other miners, particularly in difficult areas such as 
unusually steep grades. Such assistance would likely also be needed in 
an actual emergency and therefore the drills would be particularly 
instructive to all the miners participating in the drills.
    MSHA believes that for areas where mechanized mining equipment is 
being installed or removed, providing escapeways and posting maps 
identifying these escapeways and conducting the drills specified in the 
standard are essential to maintain safety. These requirements help to 
assure that miners are familiar with escape routes so that should 
urgent escape become necessary, they can reach the surface as quickly 
as possible.
Section 75.384  Longwall and Shortwall Travelways
    Modern mining methods include removing large blocks of coal in one 
continuous operation along a wall which can be several hundred feet 
long. This method is known as longwall or shortwall mining. To avoid 
trapping miners in the face area without a means of escape in the event 
of an emergency, there is a need to have a travelway on the side of the 
block of coal opposite the escapeways. Section 75.384 addresses the 
requirements for a travelway on the tailgate side of a longwall or 
shortwall, the location and marking of the travelway, and procedures to 
follow during a blockage of the travelway.
    MSHA proposed no changes to the existing rule. Likewise, the final 
rule makes no changes to the existing rule. The preamble to the 
proposal explained that MSHA had received comment suggesting that the 
existing rule be modified to provide for additional involvement by 
miners when a roof fall or other blockage occurs that prevents travel 
in the tailgate travelway. MSHA believes that the existing procedures 
and regulations appropriately address the hazards and provide a 
sufficient opportunity for input and involvement for all interested 
parties. The preamble to the proposal contains a discussion of the 
existing procedures and regulations.
    One commenter recommended several additions to existing Sec. 75.384 
while 

[[Page 9822]]
agreeing that maintenance of a tailgate travelway is essential. The 
recommendations included requiring the tailgate travelway to be 
ventilated by intake air. The commenter noted that several mines 
presently ventilate in this manner, providing intake air splits at both 
headgate and tailgate. While this system has certain advantages, it is 
not feasible or practical in all cases.
Section 75.388  Boreholes in Advance of Mining.
    Areas of a mine, or of an adjacent mine, can be located in close 
proximity to an advancing working place but can be inaccessible for a 
variety of reasons. These inaccessible areas of a mine can present 
hazards when mining proceeds inadvertently or improperly into these 
areas. Inaccessible areas may contain potentially dangerous 
accumulations of gases or water, which could result in explosions or 
inundations. To protect against these hazards, Sec. 75.388 requires 
operators to drill boreholes into the coal before they extract it. In 
this manner, the operator can determine whether mining, if continued, 
will penetrate an area where unknown hazards may be present. Boreholes 
are not required when the area toward which mining is advancing is 
accessible and is properly examined.
    The final rule revises requirements for the drilling of boreholes 
in advance of mining. It requires boreholes to be drilled in both ribs 
of advancing working places unless an alternative drilling plan is 
approved by the district manager in accordance with existing paragraph 
(g) of this section. Existing paragraph (c) requires that boreholes be 
drilled in at least one rib of advancing working places described in 
Sec. 75.388 (a). Although MSHA did not intend any change in 
promulgating the existing language, comments indicated that some 
confusion existed. To address this issue, MSHA proposed to revise the 
existing standard and adopt language similar to the regulation which 
was in effect prior to 1992. The proposed revisions to Sec. 75.388 (c) 
would have required bore holes to be drilled in one or both ribs of 
advancing working places described in Sec. 75.388(a), `` . . . as may 
be necessary for adequate protection of miners in such working 
places.''
    Several comments were received in response to the proposal. One 
commenter indicated that the proposed revision was unnecessary since 
the 1992 standard adequately indicated that more than one rib may need 
to be drilled. Another commenter stated that drilling one rib is always 
adequate since required drilling in adjacent places will assure that 
the entire area is explored by drilling. MSHA's experience is that 
working places are seldom developed at the same rate and some may lag 
by significant distances. In addition, entry or room centers are 
ordinarily in excess of the 20 foot drill hole depth specified in the 
standard. Thus, coverage over the entire width of the advancing section 
is not always provided as suggested by the commenter. Another example 
would be where an advance heading approaches an inaccurately mapped 
abandoned mine such that the unknown workings are approached near the 
undrilled ribline. An inundation could occur at the undrilled ribline 
as the working place advanced. To address these hazards, the final rule 
requires drilling of both ribs. If the workings were not discovered 
through drilling, multiple fatalities could result from inundations of 
water, methane, or oxygen deficient atmosphere (black damp). Accidents 
similar to this scenario have occurred and resulted in inundations of 
water, methane, or irrespirable atmospheres.
    One commenter noted that 38 inundations of gases or water occurred 
between 1990 and 1994. MSHA notes that this number represents only 
those accidental cut-throughs which resulted in inundations. It should 
be noted that numerous additional accidental cut-throughs have occurred 
which did not result in inundations. Each of these additional 
accidental cut-throughs demonstrates the potential for a serious or 
fatal accident. The commenter stated that the number of inundations and 
the potential for multiple fatalities warrant a revision to the 
standard to require both ribs to be drilled. Similar comments and 
examples were heard during the public hearings. MSHA agrees.
    MSHA concludes that in general, both ribs should be drilled; 
however, under some circumstances drilling of both ribs may be 
unnecessary. Moreover, MSHA recognizes that there are circumstances 
where it would be unnecessary to drill both ribs at all times. Thus, 
the final rule requires that both ribs be drilled unless the district 
manager grants approval for an alternative drilling pattern under 
existing paragraph (g). Under existing paragraph (g), an alternative 
drilling pattern may be approved which may not require drilling of both 
ribs. As with other plans which are subject to approval, requests for 
alternative drilling patterns will be reviewed on a case by case basis. 
After considering all comments received discussing this issue, MSHA has 
concluded that the hazard of an inundation is properly addressed by the 
final rule which retains sufficient flexibility for a site specific 
drilling pattern if the district manager can be satisfied that the 
alternative is suitable to the particular circumstances.
    Another comment suggested that the minimum distances which trigger 
drilling as specified in Sec. 75.388 (a)(1), (a)(2), and (a)(3) be 
revised to 100, 500, and 500 feet, respectively. In 
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
support of the 
suggestion, the commenter noted factors such as inaccurate old mine 
maps, unmapped mining over-boundary or outside the legal limits, lost 
maps or unknown mines, and less than diligent research by some 
operators. The minimum drilling distances in paragraph (a) were not 
proposed for revision and the final rule does not address them. 
However, it is important to note that the distances specified are the 
minimum at which drilling must begin if there is reasonable confidence 
in the position of the old workings. The distances specified provide a 
safety factor to account for slight mining overruns, mapping errors, 
small deliberate omissions, and similar factors in cases where the 
position of the old workings are known with reasonable certainty. In 
cases where old workings are known to exist but the position is unknown 
or known with little confidence, drilling would be necessary in excess 
of the minimum distances specified in (a) to assure compliance with the 
standard.
Section 75.389  Mining into Inaccessible Areas
    While Sec. 75.388 addresses the need to identify inaccessible areas 
to avoid accidentally drilling into an area containing a possible 
hazardous environment, Sec. 75.389 establishes procedures for drilling 
into an inaccessible area that has been identified. Section 75.389 
requires a separate plan be developed and approved for drilling into 
inaccessible areas. Paragraph (c) of the final rule clarifies that the 
requirements of Sec. 75.389(c)(1), (c)(2) and (c)(3) do not apply to 
routine mining-through operations that are part of a retreat section 
ventilation system approved in accordance with Sec. 75.371(f) and (x). 
The final rule retains the proposed language.
    The preamble to the proposal pointed out that, based on comments 
received during informational meetings and other discussions, differing 
interpretations of the application of existing Sec. 75.389 existed. 
Some persons were interpreting paragraph (c) as requiring, for example, 
the mine to be evacuated during the break-through of a pillar split in 
a retreating section. However, paragraphs (a) through (c) of 
Sec. 75.389 were intended to apply during mining-through operations in 
areas subject to Sec. 75.388 

[[Page 9823]]
where hazards and potential hazards may be unknown. The final rule 
revises existing Sec. 75.389(c) by adding an exception for routine 
mining-through operations that are a part of a retreat mining system 
approved in the mine ventilation plan. In some circumstances, the 
mining through occurs during routine mining into an area which is 
covered by an approved mine ventilation plan. In this case, the 
potential hazards have already been addressed in the mine ventilation 
plan. Requiring the operator to submit duplicate plans would not result 
in any safety benefit; therefore, the level of safety provided by the 
existing standard is maintained.

Petitions for Modification

    Operators with petitions for modification that involve the 
standards revised in this rulemaking need to determine the status of 
those petitions before the effective date of the rule. If there are 
sections of this rule that are renumbered but remain substantively 
unchanged from the existing standards, operators with modifications 
granted for these standards need not reapply. However, operators with 
petitions for modifications granted for standards that have been 
revised must comply with the new rule on its effective date. New 
petitions for modification of the final rule may be submitted under 30 
CFR part 44. If Agency assistance is needed, questions should be 
directed to the appropriate MSHA district office.

Derivation Table

    The following derivation table lists the number of each final 
standard and the number of the existing standard from which it is 
derived.

------------------------------------------------------------------------
         New section                          Old section               
------------------------------------------------------------------------
75.301.......................  Partly new, 75.301.                      
75.310(a)(3).................  Partly new, 75.310(a)(3).                
75.310(a)(4).................  Partly new, 75.310(a)(4).                
75.310(c)....................  Partly new, 75.310(c).                   
75.310(c)(1).................  Partly new, 75.310(c).                   
75.310(c)(2).................  75.310(c).                               
75.310(c)(3).................  New.                                     
75.310(c)(4).................  Partly new, 75.310(c).                   
75.310(c)(4)(i)..............  75.310(c)(1).                            
75.310(c)(4)(ii).............  75.310(c)(2).                            
75.310(c)(5).................  New.                                     
75.311(d)....................  Partly new, 75.311(d).                   
75.312(a)....................  Partly new, 75.312(a).                   
75.312(b)(1).................  Partly new, 75.312(b)(1).                
75.312(b)(1)(i)..............  New.                                     
75.312(b)(1)(ii).............  75.312(b)(1) through(b)(1)(ii).          
75.312(c)....................  Partly new, 75.312(c).                   
75.312(d)....................  Partly new, 75.312(d).                   
75.312(f)(1).................  75.312(f).                               
75.312(f)(2).................  New.                                     
75.312(g)(1).................  Partly new, 75.312(g)(1).                
75.312(g)(2).................  New.                                     
75.312(g)(3).................  Partly new, 75.312(g)(3).                
75.312(h)....................  Partly new, 75.312(h).                   
75.313(a)(1).................  75.313(a)(1).                            
75.313(a)(2).................  75.313(a)(2).                            
75.313(a)(3).................  75.313(a)(3).                            
75.313(b)....................  75.313(b).                               
75.313(c)(1).................  75.313(c)(1).                            
75.313(c)(2).................  Partly new, 75.313(c)(2).                
75.313(c)(3).................  Partly new, 75.313(c)(3).                
75.313(d)(1)(i)..............  Partly new, 75.313(d)(1)(i).             
75.313(d)(1)(ii).............  Partly new, 75.313(d)(1)(ii).            
75.313(d)(2).................  Partly new, 75.313(d)(2).                
75.320(e)....................  New.                                     
75.321(a)(1).................  Partly new, 75.321(a).                   
75.321(a)(2).................  Partly new, 75.321(a).                   
75.323(b)(1).................  75.323(b)(1).                            
75.323(b)(1)(i)..............  75.323(b)(1)(i).                         
75.323(b)(1)(ii).............  Partly new, 75.323(b)(1)(ii).            
75.323(b)(1)(iii)............  75.323(b)(1)(iii).                       
75.323(b)(2).................  75.323(b)(2).                            
75.323(b)(2)(i)..............  75.323(b)(2)(i).                         
75.323(b)(2)(ii).............  75.323(b)(2)(ii).                        
75.323(c)(1).................  Partly new, 75.323(c)(1).                
75.323(d)(2)(i)..............  Partly new, 75.323(d)(2)(i).             
75.325(d)....................  Partly new, 75.325(d).                   
75.330(c)....................  New.                                     
75.332(a)(1).................  75.332(a)(1).                            
75.333(a)....................  Partly new, 75.333(a).                   
75.333(b)(1).................  Partly new, 75.333(b)(1).                
75.333(b)(3).................  Partly new, 75.333(b)(3).                
75.333(b)(4).................  Partly new, 75.333(b)(4).                
75.333(e)(1)(i)..............  Partly new, 75.333(e)(1).                
75.333(e)(1)(ii).............  Partly new, 75.333(e)(2).                
75.333(h)....................  75.333(e)(1).                            
75.334(e)....................  Partly new, 75.334(e).                   

[[Page 9824]]
                                                                        
75.334(f)(3).................  Partly new, 75.334(f)(3).                
75.340(a)....................  Partly new, 75.340(a).                   
75.342(a)(4).................  Partly new, 75.342(a)(4).                
75.342(a)(4)(i)..............  New.                                     
75.342(a)(4)(ii).............  New.                                     
75.342(a)(4)(iii)............  New.                                     
75.344(a)....................  Partly new, 75.344(a).                   
75.344(a)(1).................  Partly new, 75.344(b)(1).                
75.344(a)(2).................  Partly new, 75.344(a)(1).                
75.344(a)(2)(i)..............  75.344(b)(2)(i).                         
75.344(a)(2)(ii).............  75.344(b)(2)(ii).                        
75.344(b)....................  Partly new, 75.344(a)(2).                
75.344(e)....................  New.                                     
75.360(a)(1).................  Partly new, 75.360(a)(1).                
75.360(a)(2).................  New.                                     
75.360(b)....................  75.360(b).                               
75.360(b)(1).................  Partly new, 75.360(b)(1).                
75.360(b)(3).................  Partly new, 75.360(b)(3).                
75.360(b)(4).................  Partly new, 75.360(b)(4).                
75.360(b)(6)(i)..............  Partly new, 75.360(b)(6).                
75.360(b)(6)(ii).............  Partly new, 75.360(b)(6).                
75.360(b)(8).................  New.                                     
75.360(b)(9).................  New.                                     
75.360(b)(10)................  New.                                     
75.360(e)....................  75.360(f).                               
75.360(f)....................  Partly new, 75.360(g).                   
75.360(g)....................  Partly new, 75.360(h).                   
75.362(a)(1).................  Partly new, 75.362(a)(1).                
75.362(a)(2).................  New.                                     
75.362(c)(1).................  Partly new, 75.362(c)(1).                
75.362(c)(2).................  75.362(c)(2).                            
75.362(d)(1)(i)..............  New.                                     
75.362(d)(1)(iii)............  Partly new, 75.362(d)(1)(ii).            
75.362(d)(2).................  Partly new, 75.362(d)(2).                
75.362(g)(1).................  New.                                     
75.362(g)(2).................  New.                                     
75.363.......................  Partly new, 75.313, 75.361, 75.362.      
75.364(a)(1).................  Partly new, 75.364(a)(1).                
75.364(a)(2)(i)..............  Partly new, 75.364(a)(2)(i).             
75.364(a)(2)(ii).............  Partly new, 75.364(a)(2)(ii).            
75.364(a)(2)(iii)............  Partly new, 75.364(a)(2)(iii).           
75.364(a)(2)(iv).............  Partly new, 75.364(a)(2)(iii).           
75.364(h)....................  Partly new, 75.364(h).                   
75.364(i)....................  Partly new, 75.364(i).                   
75.370(a)(3).................  Partly new, 75.370(a)(3).                
75.370(a)(3)(i)..............  New.                                     
75.370(a)(3)(ii).............  75.370(a)(3).                            
75.370(a)(3)(iii)............  Partly new, 75.370(a)(3).                
75.370(b)....................  New.                                     
75.370(c)(1).................  Partly new, 75.370(b)(1).                
75.370(c)(2).................  75.370(b)(2).                            
75.370(f)....................  Partly new, 75.370(e).                   
75.370(f)(1).................  New.                                     
75.370(f)(2).................  Partly new, 75.370(e).                   
75.370(f)(3).................  Partly new, 75.370(e).                   
75.371(r)....................  Partly new, 75.371(r).                   
75.371(s)....................  Partly new, 75.371(s).                   
75.371(z)....................  Partly new, 75.371(z).                   
75.371(bb)...................  Partly new, 75.371(bb).                  
75.371(cc)...................  Partly new, 75.371(cc).                  
75.372(b)(3).................  Partly new, 75.372(b)(3).                
75.372(b)(19)................  New.                                     
75.372(b)(20)................  New.                                     
75.380(b)(1).................  75.380(b)(1).                            
75.380(b)(2).................  75.380(b)(2).                            
75.380(d)(3).................  Partly new, 75.380(d)(3).                
75.380(d)(4)(ii).............  Partly new, 75.380(d)(4)(ii).            
75.380(d)(4)(iii)............  New.                                     
75.380(d)(4)(iv).............  New.                                     
75.380(d)(5).................  Partly new, 75.380(d)(5).                
75.380(f)....................  Partly new, 75.380(f)(1).                
75.380(f)(1).................  Partly new, 75.380(f)(1).                
75.380(f)(2).................  Partly new, 75.380(f)(1).                

[[Page 9825]]
                                                                        
75.380(f)(3).................  Partly new, 75.380(f)(1).                
75.380(f)(4).................  Partly new, 75.380(f)(2).                
75.380(f)(5).................  Partly new, 75.380(f)(2).                
75.380(f)(6).................  New.                                     
75.380(f)(7).................  New.                                     
75.380(i)(2).................  Partly new, 75.380(i)(2).                
75.382(g)....................  New.                                     
75.383(a)....................  Partly new, 75.383(a).                   
75.383(b)(1).................  75.383(b)(1).                            
75.388(c)....................  Partly new, 75.388(c).                   
75.389(c)....................  New.                                     
75.389(c)(1).................  75.389(c)(1).                            
------------------------------------------------------------------------

Redesignation Table

    The following redesignation table lists the section number of the 
existing standard and the section number of the final standard which 
contain revised provisions derived from the corresponding existing 
section.

----------------------------------------------------------------------------------------------------------------
                   Old section                                              New section                         
----------------------------------------------------------------------------------------------------------------
75.310(a)(3)....................................  75.310(a)(3).                                                 
75.310(a)(4)....................................  75.310(a)(4).                                                 
75.310(c).......................................  75.310(c).                                                    
75.310(c).......................................  75.310(c)(1).                                                 
75.310(c).......................................  75.310(c)(2).                                                 
75.310(c).......................................  75.310(c)(4).                                                 
75.310(c)(1)....................................  75.310(c)(4)(i).                                              
75.310(c)(2)....................................  75.310(c)(4)(ii).                                             
75.311(d).......................................  75.311(d).                                                    
75.312(a).......................................  75.312(a).                                                    
75.312(b)(1)....................................  75.312(b)(1), 75.312(b)(1)(ii).                               
75.312(b)(1)(i).................................  75.312(b)(1)(ii)(A).                                          
75.312(b)(1)(ii)................................  75.312(b)(1)(ii)(B).                                          
75.312(c).......................................  75.312(c).                                                    
75.312(d).......................................  75.312(d).                                                    
75.312(f).......................................  75.312(f)(1).                                                 
75.312(g)(1)....................................  75.312(g)(1).                                                 
75.312(g)(3)....................................  75.312(g)(3).                                                 
75.312(h).......................................  75.312(h).                                                    
75.313(c)(2)....................................  75.313(c)(2).                                                 
75.313(c)(3)....................................  75.313(c)(3).                                                 
75.313(d)(1)(i).................................  75.313(d)(1)(i).                                              
75.313(d)(1)(ii)................................  75.313(d)(1)(ii).                                             
75.321(a).......................................  75.321(a)(1).                                                 
75.321(a).......................................  75.321(a)(2).                                                 
75.323(b)(1)(ii)................................  75.323(b)(1)(ii).                                             
75.323(c)(1)....................................  75.323(c)(1).                                                 
75.323(d)(2)(i).................................  75.323(d)(2)(i).                                              
75.325(d).......................................  75.325(d).                                                    
75.333(a).......................................  75.333(a).                                                    
75.333(b)(1)....................................  75.333(b)(1).                                                 
75.333(b)(3)....................................  75.333(b)(3).                                                 
75.333(b)(4)....................................  75.333(b)(4).                                                 
75.333(e)(1)....................................  75.333(e)(1)(i).                                              
75.333(e)(1)....................................  75.333(e)(1)(ii).                                             
75.334(e).......................................  75.334(e).                                                    
75.334(f)(3)....................................  75.334(f)(3).                                                 
75.340(a).......................................  75.340(a)                                                     
75.340(a)(1)....................................  75.340(a)(1)(i).                                              
75.340(a)(2)....................................  75.340(a)(1)(ii).                                             
75.340(a)(3)....................................  75.340(a)(1)(iii).                                            
75.340(a)(3)(i).................................  75.340(a)(1)(iii)(A).                                         
75.340(a)(3)(ii)................................  75.340(a)(1)(iii)(B).                                         
75.340(a).......................................  75.340(a)(2).                                                 
75.340(a)(1)....................................  75.340(a)(2)(i).                                              
75.340(a)(2)....................................  75.340(a)(2)(ii).                                             
75.342(a)(4)....................................  75.342(a)(4).                                                 
75.344(a).......................................  75.344(a).                                                    
75.344(a)(1)....................................  75.344(a)(2).                                                 
75.344(a)(2)....................................  75.344(b).                                                    
75.344(b)(1)....................................  75.344(a)(1).                                                 
75.344(b)(2)....................................  75.344(a)(2).                                                 
75.344(b)(2)(i).................................  75.344(a)(2)(i).                                              

[[Page 9826]]
                                                                                                                
75.344(b)(2)(ii)................................  75.344(a)(2)(ii).                                             
75.360(a).......................................  75.360(a)(1).                                                 
75.360(b).......................................  75.360(b).                                                    
75.360(b)(1)....................................  75.360(b)(1).                                                 
75.360(b)(3)....................................  75.360(b)(3).                                                 
75.360(b)(4)....................................  75.350(b)(4).                                                 
75.360(b)(6)....................................  75.360(b)(6)(i).                                              
75.360(b)(6)....................................  75.360(b)(6)(ii).                                             
75.360(c).......................................  75.360(c).                                                    
75.360(c)(1)....................................  75.360(c)(1).                                                 
75.360(c)(3.....................................  75.360(c)(3).                                                 
75.360(e).......................................  75.363.                                                       
75.360(f).......................................  75.360(e).                                                    
75.360(g).......................................  75.360(f).                                                    
75.360(h).......................................  75.360(g).                                                    
75.362(a)(1)....................................  75.362(a)(1).                                                 
75.363(a)(2)....................................  75.363.                                                       
75.362(c)(1)....................................  75.362(c)(1).                                                 
75.362(d)(1)(i).................................  75.362(d)(1)(ii).                                             
75.362(d)(1)(ii)................................  75.362(d)(1)(iii).                                            
75.362(d)(2)....................................  75.362(d)(2).                                                 
75.362(g).......................................  75.363.                                                       
75.362(h).......................................  75.363.                                                       
75.364(a)(1)....................................  75.364(a)(1).                                                 
75.364(a)(2)(i).................................  75.364(a)(2)(i).                                              
75.364(a)(2)(ii)................................  75.364(a)(2)(ii).                                             
75.364(a)(2)(iii)...............................  75.364(a)(2)(iii).                                            
75.364(h).......................................  75.364(h).                                                    
75.364(i).......................................  75.364(i).                                                    
75.370(a)(3)....................................  75.370(a)(3).                                                 
75.370(a)(3)....................................  75.370(a)(3)(ii).                                             
75.370(a)(3)....................................  75.370(a)(3)(iii).                                            
75.370(b)(1)....................................  75.370(c)(1).                                                 
75.370(b)(2)....................................  75.370(c)(2).                                                 
75.370(e).......................................  75.370(f).                                                    
75.370(e).......................................  75.370(f)(2).                                                 
75.370(e).......................................  75.370(f)(3).                                                 
75.371(r).......................................  75.371(r).                                                    
75.371(s).......................................  75.371(s).                                                    
75.371(z).......................................  75.371(z).                                                    
75.371(bb)......................................  75.371(bb).                                                   
75.371(cc)......................................  75.371(cc).                                                   
75.372(b)(3)....................................  75.372(b)(3).                                                 
75.380(d)(3)....................................  75.380(d)(3).                                                 
75.380(d)(4)(ii)................................  75.380(d)(4)(ii).                                             
75.380(d)(5)....................................  75.380(d)(5).                                                 
75.380(f).......................................  75.380(f).                                                    
75.380(i)(2)....................................  75.380(i)(2).                                                 
75.383(a).......................................  75.383(a).                                                    
75.388(c).......................................  75.388(c).                                                    
75.389(c)(1)....................................  75.389(c)(1).                                                 
----------------------------------------------------------------------------------------------------------------

III. Paperwork Reduction Act

    The information collection requirements contained in this rule have 
been submitted to the Office of Management and Budget (OMB) for review 
under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520), as 
implemented by OMB in regulations at 5 CFR part 1320. No person may be 
required to respond to, or may be subjected to a penalty for failure to 
comply with, these information collection requirements until they have 
been approved and MSHA has announced the assigned OMB control number. 
The OMB control number, when assigned, will be announced by separate 
notice in the Federal Register. In accordance with Sec. 1320.11(h) of 
the implementing regulations, OMB has 60 days from today's publication 
date in which to approve, disapprove, or instruct MSHA to make a change 
to the information collection requirements in this rule.
    This final rule addresses comments submitted to OMB and MSHA on the 
collection of information requirements in the proposed rule. In 
revising the requirements from those that appeared in the proposed 
rule, MSHA has evaluated the necessity and usefulness of the 
collections of information; reevaluated MSHA's estimate of the 
information collection burden, including the validity of the underlying 
methodology and assumptions; and minimized the burden on respondents 
for the information collection requirements, to the extent possible. 
This final rule provides for the use of electronic storage and 
maintenance of records.

Benefits

    In assessing costs and benefits of the ventilation rule, it is 
important to note that ventilation of underground coal mines is the 
primary method of preventing the accumulation of explosive methane gas, 
controlling harmful respirable dust, and assuring the quality of air 
miners breath. Because 

[[Page 9827]]
of the potential for a large number of fatalities resulting from 
ventilation problems, MSHA has found it prudent to establish multiple 
safety factors and safety work practices to better assure adequate 
protection for miners. It is extremely difficult to specifically 
quantify safety benefits related to each safety factor. However, due to 
the close, confined nature of the workplace in an underground coal 
mine, failure of any safety factors or protective actions related to 
ventilation can have disastrous effects. The introduction of this rule 
lists some of those tragic mine accidents. In the restricted work 
environment of an underground coal mine, failure of a single safety 
factor or noncompliance with a safe work practice could jeopardize the 
well-being of all miners underground. The total effect of the 
provisions in this final rule in conjunction with MSHA's existing 
ventilation standards should decrease the occurrence of fatalities, 
injuries, accidents, and illnesses in underground coal mines.
    With respect to this final rule, the Agency has identified nine 
fatalities and seven injuries which potentially could have been 
prevented by compliance with these provisions. In addition, the final 
rule contains provisions to better assure compliance with the 
respirable dust control parameters specified in the mine ventilation 
plan. Adherence to these parameters helps to maintain a work 
environment free of excessive levels of respirable dust, thereby 
improving long-term health protection for miners and potentially 
reducing the number of miners afflicted with coal workers' 
pneumoconiosis.
    Some provisions clarify the intent of the existing rule. Such 
clarifications should increase the likelihood of compliance and thereby 
will help to increase the probability of preventing a fatality, injury, 
or non-injury accident. For the provisions which offer an alternative 
compliance option, the miners will be provided at least the same level 
of safety provided by an existing requirement. These provisions will 
facilitate compliance by the operator, thereby increasing the potential 
for the rule to reduce the probability of a ventilation-related 
explosion or accident.
    In conclusion, the Agency determined that these provisions will 
increase the probability that compliance with the ventilation rule will 
prevent future ventilation-related accidents and generate a safer 
mining environment.

Compliance Costs and Economic Impact

    MSHA has compared the costs associated with the existing 
requirements with the costs of the new requirements. Based upon the 
available data, MSHA estimates that compliance with the rule will 
produce net total per year costs of approximately $4.0 million for the 
mining industry. This $4.0 million is composed of approximately $0.6 
million in net annualized costs (derived from $4.0 million one-time 
costs) and approximately $3.4 million net annual recurring costs.
    With respect to large underground coal mines the net total per year 
costs will be approximately $3.0 million. This $3.0 million is composed 
of approximately $0.46 million in net annualized costs (derived from 
$3.0 million one-time costs) and approximately $2.54 million net annual 
recurring costs.
    With respect to small underground coal mines the net total per year 
costs will be approximately $1.0 million. This $1.0 million is composed 
of approximately $0.14 million in net annualized costs (derived from 
$1.0 million one-time costs) and approximately $0.82 million net annual 
recurring costs.
    Executive Order 12866 requires that regulatory agencies assess the 
impact to the government for any regulation determined to be a 
significant regulatory action. MSHA does not believe that this rule 
will create any significant cost impacts to the government. The 
regulation can be implemented under existing government practices 
without any substantial equipment or facility expenditures by the 
government.
    The incremental compliance costs for all underground coal mines are 
listed by provision in Table I.

  Table IV-1.--Compliance Costs to Comply With the Ventilation Rule for 
                       all Underground Coal Mines                       
                        [In thousands of dollars]                       
------------------------------------------------------------------------
                                           First                        
                Standard                    year   Annualized    Annual 
                                           costs      costs      costs  
------------------------------------------------------------------------
75.301..................................    (100)        (7)        (20)
75.310..................................     329         47         (70)
75.311..................................  .......  ..........  .........
75.312..................................  .......  ..........    (1,121)
75.313..................................  .......  ..........       322 
75.320..................................  .......  ..........  .........
75.321..................................     250         35          40 
75.323..................................  .......  ..........  .........
75.330..................................  .......  ..........  .........
75.333..................................  .......  ..........  .........
75.334..................................  .......  ..........  .........
75.340..................................      63          9             
75.342..................................      12          2          38 
75.344..................................      57         10       1,256 
75.360..................................     123         17      (1,556)
75.362..................................     420         59       3,275 
75.363..................................  .......  ..........       321 
75.364..................................  .......  ..........       682 
75.370..................................  .......  ..........        67 
75.371..................................  .......  ..........        13 
75.372..................................  .......  ..........  .........
75.380..................................   2,839        436          51 
75.382..................................  .......  ..........        13 
75.388..................................  .......  ..........        53 

[[Page 9828]]
                                                                        
75.389..................................                                
                                         -------------------------------
      Total costs.......................   3,993        608       3,364 
------------------------------------------------------------------------

Regulatory Flexibility Certification

    The Regulatory Flexibility Act requires that agencies evaluate and 
include, wherever possible, compliance alternatives that minimize any 
adverse impact on small businesses when developing regulatory 
standards. MSHA has not exempted small mines from any provision of the 
rule and small mines will benefit from some of the provisions and the 
alternative compliance methods.
    MSHA determined that these revisions will not generate a 
substantial cost increase for small mines. The lack of a substantial 
cost increase for small mines, in conjunction with the fact that 
similar hazards exist in both large and small mining operations, 
indicates that regulatory relief is not warranted for small mining 
operations. Therefore, MSHA has determined that these provisions will 
not have a significantly adverse impact upon a substantial number of 
small entities.
    The incremental costs for small and large mines are listed by 
provision in Table II.

  Table IV-2.--Compliance Costs to Comply With the Ventilation Rule for Small and Large Underground Coal Mines  
                                            [In thousands of dollars]                                           
----------------------------------------------------------------------------------------------------------------
                                        First year costs          Annualized costs            Annual costs      
             Standard              -----------------------------------------------------------------------------
                                       Small        Large        Small        Large        Small        Large   
----------------------------------------------------------------------------------------------------------------
75.301............................                     (100)                       (7)                      (20)
75.310............................          273          56            39           8          (78)           8 
75.311............................                                                                              
75.312............................                                                                       (1,121)
75.313............................                                                              55          267 
75.320............................                                                                              
75.321............................                      250                        35                        40 
75.323............................                                                                              
75.330............................                                                                              
75.333............................                                                                              
75.334............................                                                                              
75.340............................            4          59             1           8                           
75.342............................            6           6             1           1           18           20 
75.344............................                       57                        10           43        1,213 
75.360............................           37          86             5          12          100       (1,656)
75.362............................           80         340            11          48          409        2,866 
75.363............................                                                              98          223 
75.364............................                                                             126          556 
75.370............................                                                              12           55 
75.371............................                                                               6            7 
75.372............................                                                                              
75.380............................          585       2,254            89         347            6           45 
75.382............................                                                                           13 
75.388............................                                                              25           28 
75.389............................                                                                              
                                   -----------------------------------------------------------------------------
      Total.......................          985       3,008           146         462          820        2,544 
----------------------------------------------------------------------------------------------------------------

List of Subjects in 30 CFR Part 75

    Escapeways, Mine safety and health, Underground coal mines, 
Ventilation.

    Dated: March 4, 1996.
J. Davitt McAteer,
Assistant Secretary for Mine Safety and Health.

    Accordingly, part 75, subchapter O, chapter I, title 30 of the Code 
of Federal Regulations is amended as follows:

PART 75--MANDATORY SAFETY STANDARDS--UNDERGROUND COAL MINES

    1. The authority citation for part 75 is revised to read as 
follows:

    Authority: 30 U.S.C. 811.

    2. Subpart D of part 75 is revised to read as follows: 
    
[[Page 9829]]

Subpart D--Ventilation

Sec.
75.300  Scope.
75.301  Definitions.
75.302  Main mine fans.
75.310  Installation of main mine fans.
75.311  Main mine fan operation.
75.312  Main mine fan examinations and records.
75.313  Main mine fan stoppage with persons underground.
75.320  Air quality detectors and measurement devices.
75.321  Air quality.
75.322  Harmful quantities of noxious gases.
75.323  Actions for excessive methane.
75.324  Intentional changes in the ventilation system.
75.325  Air quantity.
75.326  Mean entry air velocity.
75.327  Air courses and trolley haulage systems.
75.330  Face ventilation control devices.
75.331  Auxiliary fans and tubing.
75.332  Working sections and working places.
75.333  Ventilation controls.
75.334  Worked-out areas and areas where pillars are being 
recovered.
75.335  Construction of seals.
75.340  Underground electrical installations.
75.341  Direct-fired intake air heaters.
75.342  Methane monitors.
75.343  Underground shops.
75.344  Compressors.
75.350  Air courses and belt haulage entries.
75.351  Atmospheric monitoring system (AMS).
75.352  Return air courses.
75.360  Preshift examination.
75.361  Supplemental examination.
75.362  On-shift examination.
75.363  Hazardous conditions; posting, correcting and recording.
75.364  Weekly examination.
75.370  Mine ventilation plan; submission and approval.
75.371  Mine ventilation plan; contents.
75.372  Mine ventilation map.
75.373  Reopening mines.
75.380  Escapeways; bituminous and lignite mines.
75.381  Escapeways; anthracite mines.
75.382  Mechanical escape facilities.
75.383  Escapeway maps and drills.
75.384  Longwall and shortwall travelways.
75.385  Opening new mines.
75.386  Final mining of pillars.
75.388  Boreholes in advance of mining.
75.389  Mining into inaccessible areas.

Sec. 75.300  Scope.

    This subpart sets requirements for underground coal mine 
ventilation.

Sec. 75.301  Definitions.

    In addition to the applicable definitions in Sec. 75.2, the 
following definitions apply in this subpart.
    Air course. An entry or a set of entries separated from other 
entries by stoppings, overcasts, other ventilation control devices, or 
by solid blocks of coal or rock so that any mixing of air currents 
between each is limited to leakage.
    Incombustible. Incapable of being burned.
    Intake air. Air that has not yet ventilated the last working place 
on any split of any working section, or any worked-out area, whether 
pillared or nonpillared.
    Intrinsically safe. Incapable of releasing enough electrical or 
thermal energy under normal or abnormal conditions to cause ignition of 
a flammable mixture of methane or natural gas and air of the most 
easily ignitable composition.
    Noncombustible Structure or Area. Describes a structure or area 
that will continue to provide protection against flame spread for at 
least 1 hour when subjected to a fire test incorporating an ASTM E119-
88 time/temperature heat input, or equivalent.
    Noncombustible Material. Describes a material which when used to 
construct a ventilation control results in a control that will continue 
to serve its intended function for 1 hour when subjected to a fire test 
incorporating an ASTM E119-88 time/temperature heat input, or 
equivalent.
    Return air. Air that has ventilated the last working place on any 
split of any working section or any worked-out area whether pillared or 
nonpillared. If air mixes with air that has ventilated the last working 
place on any split of any working section or any worked-out area, 
whether pillared or nonpillared, it is considered return air. For the 
purposes of Sec. 75.507-1, air that has been used to ventilate any 
working place in a coal producing section or pillared area, or air that 
has been used to ventilate any working face if such air is directed 
away from the immediate return is return air. Notwithstanding the 
definition of intake air, for the purpose of ventilation of structures, 
areas or installations that are required by this subpart D to be 
ventilated to return air courses, and for ventilation of seals, other 
air courses may be designated as return air courses by the operator 
only when the air in these air courses will not be used to ventilate 
working places or other locations, structures, installations or areas 
required to be ventilated with intake air.
    Worked-out area. An area where mining has been completed, whether 
pillared or nonpillared, excluding developing entries, return air 
courses, and intake air courses.

Sec. 75.302  Main mine fans.

    Each coal mine shall be ventilated by one or more main mine fans. 
Booster fans shall not be installed underground to assist main mine 
fans except in anthracite mines. In anthracite mines, booster fans 
installed in the main air current or a split of the main air current 
may be used provided their use is approved in the ventilation plan.

Sec. 75.310  Installation of main mine fans.

    (a) Each main mine fan shall be--
    (1) Installed on the surface in an incombustible housing;
    (2) Connected to the mine opening with incombustible air ducts;
    (3) Equipped with an automatic device that gives a signal at the 
mine when the fan either slows or stops. A responsible person 
designated by the operator shall always be at a surface location at the 
mine where the signal can be seen or heard while anyone is underground. 
This person shall be provided with two-way communication with the 
working sections and work stations where persons are routinely assigned 
to work for the majority of a shift;
    (4) Equipped with a pressure recording device or system. Mines 
permitted to shut down main mine fans under Sec. 75.311 and which do 
not have a pressure recording device installed on main mine fans shall 
have until March 11, 1997 to install a pressure recording device or 
system on all main mine fans. If a device or system other than a 
circular pressure recorder is used to monitor main mine fan pressure, 
the monitoring device or system shall provide a continuous graph or 
continuous chart of the pressure as a function of time. At not more 
than 7-day intervals, a hard copy of the continuous graph or chart 
shall be generated or the record of the fan pressure shall be stored 
electronically. When records of fan pressure are stored electronically, 
the system used to store these records shall be secure and not 
susceptible to alteration and shall be capable of storing the required 
data. Records of the fan pressure shall be retained at a surface 
location at the mine for at least 1 year and be made available for 
inspection by authorized representatives of the Secretary and the 
representative of miners;
    (5) Protected by one or more weak walls or explosion doors, or a 
combination of weak walls and explosion doors, located in direct line 
with possible explosive forces;
    (6) Except as provided under paragraph (e) of this section, offset 
by at least 15 feet from the nearest side of the mine opening unless an 
alternative method of protecting the fan and its associated components 
is approved in the ventilation plan. 

[[Page 9830]]

    (b)(1) If an electric motor is used to drive a main mine fan, the 
motor shall operate from a power circuit independent of all mine power 
circuits.
    (2) If an internal combustion engine is used to drive a main mine 
fan--
    (i) The fuel supply shall be protected against fires and 
explosions;
    (ii) The engine shall be installed in an incombustible housing and 
be equipped with a remote shut-down device;
    (iii) The engine and the engine exhaust system shall be located out 
of direct line of the air current exhausting from the mine; and
    (iv) The engine exhaust shall be vented to the atmosphere so that 
the exhaust gases do not contaminate the mine intake air current or any 
enclosure.
    (c) If a main mine fan monitoring system is used under Sec. 75.312, 
the system shall--
    (1) Record, as described in paragraph (a)(4) the mine ventilating 
pressure;
    (2) Monitor bearing temperature, revolutions per minute, vibration, 
electric voltage, and amperage;
    (3) Provide a printout of the monitored parameters, including the 
mine ventilating pressure within a reasonable period, not to exceed the 
end of the next scheduled shift during which miners are underground; 
and
    (4) Be equipped with an automatic device that signals when--
    (i) An electrical or mechanical deficiency exists in the monitoring 
system; or
    (ii) A sudden increase or loss in mine ventilating pressure occurs.
    (5) Provide monitoring, records, printouts, and signals required by 
paragraphs (c)(1) through (c)(4) at a surface location at the mine 
where a responsible person designated by the operator is always on duty 
and where signals from the monitoring system can be seen or heard while 
anyone is underground. This person shall be provided with two-way 
communication with the working sections and work stations where persons 
are routinely assigned to work for the majority of a shift.
    (d) Weak walls and explosion doors shall have cross-sectional areas 
at least equal to that of the entry through which the pressure from an 
explosion underground would be relieved. A weak wall and explosion door 
combination shall have a total cross-sectional area at least equal to 
that of the entry through which the pressure from an explosion 
underground would be relieved.
    (e) If a mine fan is installed in line with an entry, a slope, or a 
shaft--
    (1) The cross-sectional area of the pressure relief entry shall be 
at least equal to that of the fan entry;
    (2) The fan entry shall be developed out of direct line with 
possible explosive forces;
    (3) The coal or other solid material between the pressure relief 
entry and the fan entry shall be at least 2,500 square feet; and
    (4) The surface opening of the pressure relief entry shall be not 
less than 15 feet nor more than 100 feet from the surface opening of 
the fan entry and from the underground intersection of the fan entry 
and pressure relief entry.
    (f) In mines ventilated by multiple main mine fans, incombustible 
doors shall be installed so that if any main mine fan stops and air 
reversals through the fan are possible, the doors on the affected fan 
automatically close.

Sec. 75.311  Main mine fan operation.

    (a) Main mine fans shall be continuously operated, except as 
otherwise approved in the ventilation plan, or when intentionally 
stopped for testing of automatic closing doors and automatic fan signal 
devices, maintenance or adjustment of the fan, or to perform 
maintenance or repair work underground that cannot otherwise be made 
while the fan is operating.
    (b) Except as provided in paragraph (c) of this section, when a 
main mine fan is intentionally stopped and the ventilating quantity 
provided by the fan is not maintained by a back-up fan system--
    (1) Only persons necessary to evaluate the effect of the fan 
stoppage or restart, or to perform maintenance or repair work that 
cannot otherwise be made while the fan is operating, shall be permitted 
underground;
    (2) Mechanized equipment shall be shut off before stopping the fan; 
and
    (3) Electric power circuits entering underground areas of the mine 
shall be deenergized.
    (c) When a back-up fan system is used that does not provide the 
ventilating quantity provided by the main mine fan, persons may be 
permitted in the mine and electric power circuits may be energized as 
specified in the approved ventilation plan.
    (d) If an unusual variance in the mine ventilation pressure is 
observed, or if an electrical or mechanical deficiency of a main mine 
fan is detected, the mine foreman or equivalent mine official, or in 
the absence of the mine foreman or equivalent mine official, a 
designated certified person acting for the mine foreman or equivalent 
mine official shall be notified immediately, and appropriate action or 
repairs shall be instituted promptly.
    (e) While persons are underground, a responsible person designated 
by the operator shall always be at a surface location where each main 
mine fan signal can be seen or heard.
    (f) The area within 100 feet of main mine fans and intake air 
openings shall be kept free of combustible material, unless alternative 
precautions necessary to provide protection from fire or other products 
of combustion are approved in the ventilation plan.
    (g) If multiple mine fans are used, the mine ventilation system 
shall be designed and maintained to eliminate areas without air 
movement.
    (h) Any atmospheric monitoring system operated during fan stoppages 
shall be intrinsically safe.

Sec. 75.312  Main mine fan examinations and records.

    (a) To assure electrical and mechanical reliability of main mine 
fans, each main mine fan and its associated components, including 
devices for measuring or recording mine ventilation pressure, shall be 
examined for proper operation by a trained person designated by the 
operator. Examinations of main mine fans shall be made at least once 
each day that the fan operates, unless a fan monitoring system is used. 
No examination is required on any day when no one, including certified 
persons, goes underground, except that an examination shall be 
completed prior to anyone entering the mine.
    (b)(1) If a main mine fan monitoring system is used, a trained 
person designated by the operator shall--
    (i) At least once each day review the data provided by the fan 
monitoring system to assure that the fan and the fan monitoring system 
are operating properly. No review is required on any day when no one, 
including certified persons, goes underground, except that a review of 
the data shall be performed prior to anyone entering the underground 
portion of the mine. Data reviewed should include the fan pressure, 
bearing temperature, revolutions per minute, vibration, electric 
voltage, and amperage; and
    (ii) At least every 7 days--
    (A) Test the monitoring system for proper operation; and
    (B) Examine each main mine fan and its associated components to 
assure electrical and mechanical reliability of main mine fans.
    (2) If the monitoring system malfunctions, the malfunction shall be 
corrected, or paragraph (a) of this section shall apply.
    (c) At least every 31 days, the automatic fan signal device for 
each main mine fan shall be tested by stopping the fan. Only persons 

[[Page 9831]]
necessary to evaluate the effect of the fan stoppage or restart, or to 
perform maintenance or repair work that cannot otherwise be made while 
the fan is operating, shall be permitted underground. Notwithstanding 
the requirement of Sec. 75.311(b)(3), underground power may remain 
energized during this test provided no one, including persons 
identified in Sec. 75.311(b)(1), is underground. If the fan is not 
restarted within 15 minutes, underground power shall be deenergized and 
no one shall enter any underground area of the mine until the fan is 
restarted and an examination of the mine is conducted as described in 
Sec. 75.360 (b) through (e) and the mine has been determined to be 
safe.
    (d) At least every 31 days, the automatic closing doors in multiple 
main mine fan systems shall be tested by stopping the fan. Only persons 
necessary to evaluate the effect of the fan stoppage or restart, or to 
perform maintenance or repair work that cannot otherwise be made while 
the fan is operating, shall be permitted underground. Notwithstanding 
the provisions of Sec. 75.311, underground power may remain energized 
during this test provided no one, including persons identified in 
Sec. 75.311(b)(1), is underground. If the fan is not restarted within 
15 minutes, underground power shall be deenergized and no one shall 
enter any underground area of the mine, until the fan is restarted and 
an examination of the mine is conducted as described in Sec. 75.360 (b) 
through (e) and the mine has been determined to be safe.
    (e) Circular main mine fan pressure recording charts shall be 
changed before the beginning of a second revolution.
    (f)(1) Certification. Persons making main mine fan examinations 
shall certify by initials and date at the fan or another location 
specified by the operator that the examinations were made. Each 
certification shall identify the main mine fan examined.
    (2) Persons reviewing data produced by a main mine fan monitoring 
system shall certify by initials and date on a printed copy of the data 
from the system that the review was completed. In lieu of certification 
on a copy of the data, the person reviewing the data may certify 
electronically that the review was completed. Electronic certification 
shall be by handwritten initials and date in a computer system so as to 
be secure and not susceptible to alteration.
    (g)(1) Recordkeeping. By the end of the shift on which the 
examination is made, persons making main mine fan examinations shall 
record all uncorrected defects that may affect the operation of the fan 
that are not corrected by the end of that shift. Records shall be 
maintained in a secure book that is not susceptible to alteration or 
electronically in a computer system so as to be secure and not 
susceptible to alteration.
    (2) When a fan monitoring system is used in lieu of the daily fan 
examination--
    (i) The certified copies of data produced by fan monitoring systems 
shall be maintained separate from other computer-generated reports or 
data; and
    (ii) A record shall be made of any fan monitoring system 
malfunctions, electrical or mechanical deficiencies in the monitoring 
system and any sudden increase or loss in mine ventilating pressure. 
The record shall be made by the end of the shift on which the review of 
the data is completed and shall be maintained in a secure book that is 
not susceptible to alteration or electronically in a computer system so 
as to be secure and not susceptible to alteration.
    (3) By the end of the shift on which the monthly test of the 
automatic fan signal device or the automatic closing doors is 
completed, persons making these tests shall record the results of the 
tests. Records shall be maintained in a secure book that is not 
susceptible to alteration or electronically in a computer system so as 
to be secure and not susceptible to alteration.
    (h) Retention period. Records, including records of mine fan 
pressure and the certified copies of data produced by fan monitoring 
systems, shall be retained at a surface location at the mine for at 
least 1 year and shall be made available for inspection by authorized 
representatives of the Secretary and the representative of miners.

Sec. 75.313  Main mine fan stoppage with persons underground.

    (a) If a main mine fan stops while anyone is underground and the 
ventilating quantity provided by the fan is not maintained by a back-up 
fan system--
    (1) Electrically powered equipment in each working section shall be 
deenergized;
    (2) Other mechanized equipment in each working section shall be 
shut off; and
    (3) Everyone shall be withdrawn from the working sections and areas 
where mechanized mining equipment is being installed or removed.
    (b) If ventilation is restored within 15 minutes after a main mine 
fan stops, certified persons shall examine for methane in the working 
places and in other areas where methane is likely to accumulate before 
work is resumed and before equipment is energized or restarted in these 
areas.
    (c) If ventilation is not restored within 15 minutes after a main 
mine fan stops--
    (1) Everyone shall be withdrawn from the mine;
    (2) Underground electric power circuits shall be deenergized. 
However, circuits necessary to withdraw persons from the mine need not 
be deenergized if located in areas or haulageways where methane is not 
likely to migrate to or accumulate. These circuits shall be deenergized 
as persons are withdrawn; and
    (3) Mechanized equipment not located on working sections shall be 
shut off. However, mechanized equipment necessary to withdraw persons 
from the mine need not be shut off if located in areas where methane is 
not likely to migrate to or accumulate.
    (d)(1) When ventilation is restored--
    (i) No one other than designated certified examiners shall enter 
any underground area of the mine until an examination is conducted as 
described in Sec. 75.360(b) through (e) and the area has been 
determined to be safe. Designated certified examiners shall enter the 
underground area of the mine from which miners have been withdrawn only 
after the fan has operated for at least 15 minutes unless a longer 
period of time is specified in the approved ventilation plan.
    (ii) Underground power circuits shall not be energized and 
nonpermissible mechanized equipment shall not be started or operated in 
an area until an examination is conducted as described in 
Sec. 75.360(b) through (e) and the area has been determined to be safe, 
except that designated certified examiners may use nonpermissible 
transportation equipment in intake airways to facilitate the making of 
the required examination.
    (2) If ventilation is restored to the mine before miners reach the 
surface, the miners may return to underground working areas only after 
an examination of the areas is made by a certified person and the areas 
are determined to be safe.
    (e) Any atmospheric monitoring system operated during fan stoppages 
shall be intrinsically safe.

Sec. 75.320  Air quality detectors and measurement devices.

    (a) Tests for methane shall be made by a qualified person with MSHA 
approved detectors that are maintained in permissible and proper 
operating condition and calibrated with a known 

[[Page 9832]]
methane-air mixture at least once every 31 days.
    (b) Tests for oxygen deficiency shall be made by a qualified person 
with MSHA approved oxygen detectors that are maintained in permissible 
and proper operating condition and that can detect 19.5 percent oxygen 
with an accuracy of 0.5 percent. The oxygen detectors shall 
be calibrated at the start of each shift that the detectors will be 
used.
    (c) Handheld devices that contain electrical components and that 
are used for measuring air velocity, carbon monoxide, oxides of 
nitrogen, and other gases shall be approved and maintained in 
permissible and proper operating condition.
    (d) An oxygen detector approved by MSHA shall be used to make tests 
for oxygen deficiency required by the regulations in this part. 
Permissible flame safety lamps may only be used as a supplementary 
testing device.
    (e) Maintenance of instruments required by paragraphs (a) through 
(d) of this section shall be done by persons trained in such 
maintenance.

Sec. 75.321  Air quality.

    (a)(1) The air in areas where persons work or travel, except as 
specified in paragraph (a)(2) of this section, shall contain at least 
19.5 percent oxygen and not more than 0.5 percent carbon dioxide, and 
the volume and velocity of the air current in these areas shall be 
sufficient to dilute, render harmless, and carry away flammable, 
explosive, noxious, and harmful gases, dusts, smoke, and fumes.
    (2) The air in areas of bleeder entries and worked-out areas where 
persons work or travel shall contain at least 19.5 percent oxygen, and 
carbon dioxide levels shall not exceed 0.5 percent time weighted 
average and 3.0 percent short term exposure limit.
    (b) Notwithstanding the provisions of Sec. 75.322, for the purpose 
of preventing explosions from gases other than methane, the following 
gases shall not be permitted to accumulate in excess of the 
concentrations listed below:
    (1) Carbon monoxide (CO)--2.5 percent
    (2) Hydrogen (H2)--.80 percent
    (3) Hydrogen sulfide (H2S)--.80 percent
    (4) Acetylene (C2H2)--.40 percent
    (5) Propane (C3H8)--.40 percent
    (6) MAPP (methyl-acetylene-propylene-propodiene)--.30 percent

Sec. 75.322  Harmful quantities of noxious gases.

    Concentrations of noxious or poisonous gases, other than carbon 
dioxide, shall not exceed the current threshold limit values (TLV) as 
specified and applied by the ACGIH. Detectors or laboratory analysis of 
mine air samples shall be used to determine the concentrations of 
harmful, noxious, or poisonous gases.

Sec. 75.323  Actions for excessive methane.

    (a) Location of tests. Tests for methane concentrations under this 
section shall be made at least 12 inches from the roof, face, ribs, and 
floor.
    (b) Working places and intake air courses.
    (1) When 1.0 percent or more methane is present in a working place 
or an intake air course, including an air course in which a belt 
conveyor is located, or in an area where mechanized mining equipment is 
being installed or removed--
    (i) Except intrinsically safe atmospheric monitoring systems (AMS), 
electrically powered equipment in the affected area shall be 
deenergized, and other mechanized equipment shall be shut off;
    (ii) Changes or adjustments shall be made at once to the 
ventilation system to reduce the concentration of methane to less than 
1.0 percent; and
    (iii) No other work shall be permitted in the affected area until 
the methane concentration is less than 1.0 percent.
    (2) When 1.5 percent or more methane is present in a working place 
or an intake air course, including an air course in which a belt 
conveyor is located, or in an area where mechanized mining equipment is 
being installed or removed--
    (i) Everyone except those persons referred to in Sec. 104(c) of the 
Act shall be withdrawn from the affected area; and
    (ii) Except for intrinsically safe AMS, electrically powered 
equipment in the affected area shall be disconnected at the power 
source.
    (c) Return air split. (1) When 1.0 percent or more methane is 
present in a return air split between the last working place on a 
working section and where that split of air meets another split of air, 
or the location at which the split is used to ventilate seals or 
worked-out areas changes or adjustments shall be made at once to the 
ventilation system to reduce the concentration of methane in the return 
air to less than 1.0 percent.
    (2) When 1.5 percent or more methane is present in a return air 
split between the last working place on a working section and where 
that split of air meets another split of air, or the location where the 
split is used to ventilate seals or worked-out areas--
    (i) Everyone except those persons referred to in Sec. 104(c) of the 
Act shall be withdrawn from the affected area;
    (ii) Other than intrinsically safe AMS, equipment in the affected 
area shall be deenergized, electric power shall be disconnected at the 
power source, and other mechanized equipment shall be shut off; and
    (iii) No other work shall be permitted in the affected area until 
the methane concentration in the return air is less than 1.0 percent.
    (d) Return air split alternative. (1) The provisions of this 
paragraph apply if--
    (i) The quantity of air in the split ventilating the active 
workings is at least 27,000 cubic feet per minute in the last open 
crosscut or the quantity specified in the approved ventilation plan, 
whichever is greater;
    (ii) The methane content of the air in the split is continuously 
monitored during mining operations by an AMS that gives a visual and 
audible signal on the working section when the methane in the return 
air reaches 1.5 percent, and the methane content is monitored as 
specified in Sec. 75.351; and
    (iii) Rock dust is continuously applied with a mechanical duster to 
the return air course during coal production at a location in the air 
course immediately outby the most inby monitoring point.
    (2) When 1.5 percent or more methane is present in a return air 
split between a point in the return opposite the section loading point 
and where that split of air meets another split of air or where the 
split of air is used to ventilate seals or worked-out areas--
    (i) Changes or adjustments shall be made at once to the ventilation 
system to reduce the concentration of methane in the return air below 
1.5 percent;
    (ii) Everyone except those persons referred to in Sec. 104(c) of 
the Act shall be withdrawn from the affected area;
    (iii) Except for intrinsically safe AMS, equipment in the affected 
area shall be deenergized, electric power shall be disconnected at the 
power source, and other mechanized equipment shall be shut off; and
    (iv) No other work shall be permitted in the affected area until 
the methane concentration in the return air is less than 1.5 percent.
    (e) Bleeders and other return air courses. The concentration of 
methane in a bleeder split of air immediately before the air in the 
split joins another split of air, or in a return air course other than 
as described in paragraphs (c) and (d) of this section, shall not 
exceed 2.0 percent.

[[Page 9833]]

Sec. 75.324  Intentional changes in the ventilation system.

    (a) A person designated by the operator shall supervise any 
intentional change in ventilation that--
    (1) Alters the main air current or any split of the main air 
current in a manner that could materially affect the safety or health 
of persons in the mine; or
    (2) Affects section ventilation by 9,000 cubic feet per minute of 
air or more in bituminous or lignite mines, or 5,000 cubic feet per 
minute of air or more in anthracite mines.
    (b) Intentional changes shall be made only under the following 
conditions:
    (1) Electric power shall be removed from areas affected by the 
ventilation change and mechanized equipment in those areas shall be 
shut off before the ventilation change begins.
    (2) Only persons making the change in ventilation shall be in the 
mine.
    (3) Electric power shall not be restored to the areas affected by 
the ventilation change and mechanized equipment shall not be restarted 
until a certified person has examined these areas for methane 
accumulation and for oxygen deficiency and has determined that the 
areas are safe.

Sec. 75.325  Air quantity.

    (a)(1) In bituminous and lignite mines the quantity of air shall be 
at least 3,000 cubic feet per minute reaching each working face where 
coal is being cut, mined, drilled for blasting, or loaded. When a 
greater quantity is necessary to dilute, render harmless, and carry 
away flammable, explosive, noxious, and harmful gases, dusts, smoke, 
and fumes, this quantity shall be specified in the approved ventilation 
plan. A minimum air quantity may be required to be specified in the 
approved ventilation plan for other working places or working faces.
    (2) The quantity of air reaching the working face shall be 
determined at or near the face end of the line curtain, ventilation 
tubing, or other ventilation control device. If the curtain, tubing, or 
device extends beyond the last row of permanent roof supports, the 
quantity of air reaching the working face shall be determined behind 
the line curtain or in the ventilation tubing at or near the last row 
of permanent supports.
    (3) If machine mounted dust collectors or diffuser fans are used, 
the approved ventilation plan shall specify the operating volume of the 
dust collector or diffuser fan.
    (b) In bituminous and lignite mines, the quantity of air reaching 
the last open crosscut of each set of entries or rooms on each working 
section and the quantity of air reaching the intake end of a pillar 
line shall be at least 9,000 cubic feet per minute unless a greater 
quantity is required to be specified in the approved ventilation plan.
    (c) In longwall and shortwall mining systems--
    (1) The quantity of air shall be at least 30,000 cubic feet per 
minute reaching the working face of each longwall, unless the operator 
demonstrates that a lesser air quantity will maintain continual 
compliance with applicable methane and respirable dust standards. This 
lesser quantity shall be specified in the approved ventilation plan. A 
quantity greater than 30,000 cubic feet per minute may be required to 
be specified in the approved ventilation plan.
    (2) The velocity of air that will be provided to control methane 
and respirable dust below applicable standards on each longwall or 
shortwall and the locations where these velocities will be provided 
shall be specified in the approved ventilation plan. The locations 
specified shall be at least 50 feet but no more than 100 feet from the 
headgate and tailgate, respectively.
    (d) Ventilation shall be maintained during installation and removal 
of mechanized mining equipment. The approved ventilation plan shall 
specify the minimum quantity of air, the locations where this quantity 
will be provided and the ventilation controls required.
    (e) In anthracite mines, the quantity of air shall be as follows:
    (1) At least 1,500 cubic feet per minute reaching each working face 
where coal is being mined, unless a greater quantity is required to be 
specified in the approved ventilation plan.
    (2) At least 5,000 cubic feet per minute passing through the last 
open crosscut in each set of entries or rooms and at the intake end of 
any pillar line, unless a greater quantity is required to be specified 
in the approved ventilation plan
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
.
    (3) When robbing areas where air currents cannot be controlled and 
air measurements cannot be obtained, the air shall have perceptible 
movement.

Sec. 75.326  Mean entry air velocity.

    In exhausting face ventilation systems, the mean entry air velocity 
shall be at least 60 feet per minute reaching each working face where 
coal is being cut, mined, drilled for blasting, or loaded, and to any 
other working places as required in the approved ventilation plan. A 
lower mean entry air velocity may be approved in the ventilation plan 
if the lower velocity will maintain methane and respirable dust 
concentrations below the applicable levels. Mean entry air velocity 
shall be determined at or near the inby end of the line curtain, 
ventilation tubing, or other face ventilation control devices.

Sec. 75.327  Air courses and trolley haulage systems.

    (a) In any mine opened on or after March 30, 1970, or in any new 
working section of a mine opened before that date, where trolley 
haulage systems are maintained and where trolley wires or trolley 
feeder wires are installed, an authorized representative of the 
Secretary shall require enough entries or rooms as intake air courses 
to limit the velocity of air currents in the haulageways to minimize 
the hazards of fires and dust explosions in the haulageways.
    (b) Unless the district manager approves a higher velocity, the 
velocity of the air current in the trolley haulage entries shall be 
limited to not more than 250 feet per minute. A higher air velocity may 
be required to limit the methane content in these haulage entries or 
elsewhere in the mine to less than 1.0 percent and provide an adequate 
supply of oxygen.

Sec. 75.330  Face ventilation control devices.

    (a) Brattice cloth, ventilation tubing and other face ventilation 
control devices shall be made of flame-resistant material approved by 
MSHA.
    (b)(1) Ventilation control devices shall be used to provide 
ventilation to dilute, render harmless, and to carry away flammable, 
explosive, noxious, and harmful gases, dusts, smoke, and fumes--
    (i) To each working face from which coal is being cut, mined, 
drilled for blasting, or loaded; and
    (ii) To any other working places as required by the approved 
ventilation plan.
    (2) These devices shall be installed at a distance no greater than 
10 feet from the area of deepest penetration to which any portion of 
the face has been advanced unless an alternative distance is specified 
and approved in the ventilation plan. Alternative distances specified 
shall be capable of maintaining concentrations of respirable dust, 
methane, and other harmful gases below the levels specified in the 
applicable sections of this chapter.
    (c) When the line brattice or any other face ventilation control 
device is damaged to an extent that ventilation of the working face is 
inadequate, production activities in the working place shall cease 
until necessary repairs 

[[Page 9834]]
are made and adequate ventilation is restored.

Sec. 75.331  Auxiliary fans and tubing.

    (a) When auxiliary fans and tubing are used for face ventilation, 
each auxiliary fan shall be--
    (1) Permissible, if the fan is electrically operated;
    (2) Maintained in proper operating condition;
    (3) Deenergized or shut off when no one is present on the working 
section; and
    (4) Located and operated to avoid recirculation of air.
    (b) If a deficiency exists in any auxiliary fan system, the 
deficiency shall be corrected or the auxiliary fan shall be deenergized 
immediately.
    (c) If the air passing through an auxiliary fan or tubing contains 
1.0 percent or more methane, power to electrical equipment in the 
working place and to the auxiliary fan shall be deenergized, and other 
mechanized equipment in the working place shall be shut off until the 
methane concentration is reduced to less than 1.0 percent.
    (d) When an auxiliary fan is stopped--
    (1) Line brattice or other face ventilation control devices shall 
be used to maintain ventilation to affected faces; and
    (2) Electrical equipment in the affected working places shall be 
disconnected at the power source, and other mechanized equipment shall 
be shut off until ventilation to the working place is restored.

Sec. 75.332  Working sections and working places.

    (a)(1) Each working section and each area where mechanized mining 
equipment is being installed or removed, shall be ventilated by a 
separate split of intake air directed by overcasts, undercasts or other 
permanent ventilation controls.
    (2) When two or more sets of mining equipment are simultaneously 
engaged in cutting, mining, or loading coal or rock from working places 
within the same working section, each set of mining equipment shall be 
on a separate split of intake air.
    (3) For purposes of this section, a set of mining equipment 
includes a single loading machine, a single continuous mining machine, 
or a single longwall or shortwall mining machine.
    (b)(1) Air that has passed through any area that is not examined 
under Secs. 75.360, 75.361 or 75.364 of this subpart, or through an 
area where second mining has been done shall not be used to ventilate 
any working place. Second mining is intentional retreat mining where 
pillars have been wholly or partially removed, regardless of the amount 
of recovery obtained.
    (2) Air that has passed by any opening of any unsealed area that is 
not examined under Secs. 75.360, 75.361 or 75.364 of this subpart, 
shall not be used to ventilate any working place.

Sec. 75.333  Ventilation controls.

    (a) For purposes of this section, ``doors'' include any door 
frames.
    (b) Permanent stoppings or other permanent ventilation control 
devices constructed after November 15, 1992, shall be built and 
maintained--
    (1) Between intake and return air courses, except temporary 
controls may be used in rooms that are 600 feet or less from the 
centerline of the entry from which the room was developed including 
where continuous face haulage systems are used in such rooms. Unless 
otherwise approved in the ventilation plan, these stoppings or controls 
shall be maintained to and including the third connecting crosscut 
outby the working face;
    (2) To separate belt conveyor haulageways from return air courses, 
except where belt entries in areas of mines developed before March 30, 
1970, are used as return air courses;
    (3) To separate belt conveyor haulageways from intake air courses 
when the air in the intake air courses is used to provide air to active 
working places. Temporary ventilation controls may be used in rooms 
that are 600 feet or less from the centerline of the entry from which 
the rooms were developed including where continuous face haulage 
systems are used in such rooms. When continuous face haulage systems 
are used, permanent stoppings or other permanent ventilation control 
devices shall be built and maintained to the outby most point of travel 
of the dolly or 600 feet from the point of deepest penetration in the 
conveyor belt entry, whichever distance is closer to the point of 
deepest penetration, to separate the continuous haulage entry from the 
intake entries;
    (4) To separate the primary escapeway from belt and trolley haulage 
entries, as required by Sec. 75.380(g). For the purposes of 
Sec. 75.380(g), the loading point for a continuous haulage system shall 
be the outby most point of travel of the dolly or 600 feet from the 
point of deepest penetration, whichever distance is less; and
    (5) In return air courses to direct air into adjacent worked-out 
areas.
    (c) Personnel doors shall be constructed of noncombustible material 
and shall be of sufficient strength to serve their intended purpose of 
maintaining separation and permitting travel between air courses, and 
shall be installed as follows in permanent stoppings constructed after 
November 15, 1992:
    (1) The distance between personnel doors shall be no more than 300 
feet in seam heights below 48 inches and 600 feet in seam heights 48 
inches or higher.
    (2) The location of all personnel doors in stoppings along 
escapeways shall be clearly marked so that the doors may be easily 
identified by anyone traveling in the escapeway and in the entries on 
either side of the doors.
    (3) When not in use, personnel doors shall be closed.
    (d) Doors, other than personnel doors, constructed after November 
15, 1992, that are used in lieu of permanent stoppings or to control 
ventilation within an air course shall be:
    (1) Made of noncombustible material or coated on all accessible 
surfaces with flame-retardant material having a flame-spread index of 
25 or less, as tested under ASTM E162-87.
    (2) Of sufficient strength to serve their intended purpose of 
maintaining separation and permitting travel between or within air 
courses or entries.
    (3) Installed in pairs to form an airlock. When an airlock is used, 
one side of the airlock shall remain closed. When not in use, both 
sides shall be closed.
    (e)(1)(i) Except as provided in paragraphs (e)(2), (e)(3) and 
(e)(4) of this section all overcasts, undercasts, shaft partitions, 
permanent stoppings, and regulators, installed after March 11, 1997, 
shall be constructed in a traditionally accepted method and of 
materials that have been demonstrated to perform adequately or in a 
method and of materials that have been tested and shown to have a 
minimum strength equal to or greater than the traditionally accepted 
in-mine controls. Tests may be performed under ASTM E72-80 Section 12--
Transverse Load-Specimen Vertical, load only, or the operator may 
conduct comparative in-mine tests. In-mine tests shall be designed to 
demonstrate the comparative strength of the proposed construction and a 
traditionally accepted in-mine control.
    (ii) All overcasts, undercasts, shaft partitions, permanent 
stoppings, and regulators, installed after November 15, 1992, shall be 
constructed of noncombustible material. Materials that are suitable for 
the construction of overcasts, undercasts, shaft partitions, permanent 
stoppings, and regulators include concrete, concrete block, brick, 
cinder block, tile, or steel. No ventilation controls installed after 

[[Page 9835]]
November 15, 1992, shall be constructed of aluminum.
    (2) In anthracite mines, permanent stoppings may be constructed of 
overlapping layers of hardwood mine boards, if the stoppings are a 
minimum 2 inches thick.
    (3) When timbers are used to create permanent stoppings in heaving 
or caving areas, the stoppings shall be coated on all accessible 
surfaces with a flame-retardant material having a flame-spread index of 
25 or less, as tested under ASTM E162-87, ``Surface Flammability of 
Materials Using a Radiant Heat Energy Source.''
    (4) In anthracite mines, doors and regulators may be constructed of 
overlapping layers of hardwood boards, if the doors, door frames, and 
regulators are a minimum 2 inches thick.
    (f) When sealants are applied to ventilation controls, the sealant 
shall have a flame-spread index of 25 or less under ASTM E162-87.
    (g) Before mining is discontinued in an entry or room that is 
advanced more than 20 feet from the inby rib, a crosscut shall be made 
or line brattice shall be installed and maintained to provide adequate 
ventilation. When conditions such as methane liberation warrant a 
distance less than 20 feet, the approved ventilation plan shall specify 
the location of such rooms or entries and the maximum distance they 
will be developed before a crosscut is made or line brattice is 
installed.
    (h) All permanent ventilation controls, including seals, shall be 
maintained to serve the purpose for which they were built.

Sec. 75.334  Worked-out areas and areas where pillars are being 
recovered.

    (a) Worked-out areas where no pillars have been recovered shall 
be--
    (1) Ventilated so that methane-air mixtures and other gases, dusts, 
and fumes from throughout the worked-out areas are continuously diluted 
and routed into a return air course or to the surface of the mine; or
    (2) Sealed.
    (b)(1) During pillar recovery a bleeder system shall be used to 
control the air passing through the area and to continuously dilute and 
move methane-air mixtures and other gases, dusts, and fumes from the 
worked-out area away from active workings and into a return air course 
or to the surface of the mine.
    (2) After pillar recovery a bleeder system shall be maintained to 
provide ventilation to the worked-out area, or the area shall be 
sealed.
    (c) The approved ventilation plan shall specify the following:
    (1) The design and use of bleeder systems;
    (2) The means to determine the effectiveness of bleeder systems;
    (3) The means for adequately maintaining bleeder entries free of 
obstructions such as roof falls and standing water; and
    (4) The location of ventilating devices such as regulators, 
stoppings and bleeder connectors used to control air movement through 
the worked-out area.
    (d) If the bleeder system used does not continuously dilute and 
move methane-air mixtures and other gases, dusts, and fumes away from 
worked-out areas into a return air course or to the surface of the 
mine, or it cannot be determined by examinations or evaluations under 
Sec. 75.364 that the bleeder system is working effectively, the worked-
out area shall be sealed.
    (e) Each mining system shall be designed so that each worked-out 
area can be sealed. The approved ventilation plan shall specify the 
location and the sequence of construction of proposed seals.
    (f) In place of the requirements of paragraphs (a) and (b) of this 
section, for mines with a demonstrated history of spontaneous 
combustion, or that are located in a coal seam determined to be 
susceptible to spontaneous combustion, the approved ventilation plan 
shall specify the following:
    (1) Measures to detect methane, carbon monoxide, and oxygen 
concentrations during and after pillar recovery, and in worked-out 
areas where no pillars have been recovered, to determine if the areas 
must be ventilated or sealed.
    (2) Actions that will be taken to protect miners from the hazards 
of spontaneous combustion.
    (3) If a bleeder system will not be used, the methods that will be 
used to control spontaneous combustion, accumulations of methane-air 
mixtures, and other gases, dusts, and fumes in the worked-out area.

Sec. 75.335  Construction of seals.

    (a)(1) Each seal constructed after November 15, 1992, shall be--
    (i) Constructed of solid concrete blocks at least 6 by 8 by 16 
inches, laid in a transverse pattern with mortar between all joints;
    (ii) Hitched into solid ribs to a depth of at least 4 inches and 
hitched at least 4 inches into the floor;
    (iii) At least 16 inches thick. When the thickness of the seal is 
less than 24 inches and the width is greater than 16 feet or the height 
is greater than 10 feet, a pilaster shall be interlocked near the 
center of the seal. The pilaster shall be at least 16 inches by 32 
inches; and
    (iv) Coated on all accessible surfaces with flame-retardant 
material that will minimize leakage and that has a flame-spread index 
of 25 or less, as tested under ASTM E162-87, ``Surface Flammability of 
Materials Using a Radiant Heat Energy Source.''
    (2) Alternative methods or materials may be used to create a seal 
if they can withstand a static horizontal pressure of 20 pounds per 
square inch provided the method of installation and the material used 
approved in the ventilation plan. If the alternative methods or 
materials include the use of timbers, the timbers also shall be coated 
on all accessible surfaces with flame-retardant material having a 
flame-spread index 25 or less, as tested under ASTM E162-87.
    (b) A sampling pipe or pipes shall be installed in each set of 
seals for a worked-out area. Each pipe shall--
    (1) Extend into the sealed area a sufficient distance (at least 15 
feet) to obtain a representative sample from behind the seal;
    (2) Be equipped with a cap or shut-off valve; and
    (3) Be installed with the sampling end of the pipe about 12 inches 
from the roof.
    (c)(1) A corrosion-resistant water pipe or pipes shall be installed 
in seals at the low points of the area being sealed and at all other 
locations necessary when water accumulation within the sealed area is 
possible; and
    (2) Each water pipe shall have a water trap installed on the outby 
side of the seal.

Sec. 75.340  Underground electrical installations.

    (a) Underground transformer stations, battery charging stations, 
substations, rectifiers, and water pumps shall be housed in 
noncombustible structures or areas or be equipped with a fire 
suppression system meeting the requirements of Sec. 75.1107-3 through 
Sec. 75.1107-16.
    (1) When a noncombustible structure or area is used, these 
installations shall be--
    (i) Ventilated with intake air that is coursed into a return air 
course or to the surface and that is not used to ventilate working 
places; or
    (ii) Ventilated with intake air that is monitored for carbon 
monoxide or smoke by an AMS installed and operated according to 
Sec. 75.351. Monitoring of intake air ventilating battery charging 
stations shall be done with sensors not affected by hydrogen; or
    (iii) Ventilated with intake air and equipped with sensors to 
monitor for heat and for carbon monoxide or smoke. Monitoring of intake 
air ventilating battery charging stations shall be done 

[[Page 9836]]
with sensors not affected by hydrogen. The sensors shall deenergize 
power to the installation, activate a visual and audible alarm located 
outside of and on the intake side of the enclosure, and activate doors 
that will automatically close when either of the following occurs:
    (A) The temperature in the noncombustible structure reaches 165 
deg.F; or
    (B) The carbon monoxide concentration reaches 10 parts per million 
above the ambient level for the area, or the optical density of smoke 
reaches 0.022 per meter. At least every 31 days, sensors installed to 
monitor for carbon monoxide shall be calibrated with a known 
concentration of carbon monoxide and air sufficient to activate the 
closing door, or each smoke sensor shall be tested to determine that it 
functions correctly.
    (2) When a fire suppression system is used, these installations 
shall be--
    (i) Ventilated with intake air that is coursed into a return air 
course or to the surface and that is not used to ventilate working 
places; or
    (ii) Ventilated with intake air that is monitored for carbon 
monoxide or smoke by an AMS installed and operated according to 
Sec. 75.351. Monitoring of intake air ventilating battery charging 
stations shall be done with sensors not affected by hydrogen.
    (b) This section does not apply to--
    (1) Rectifiers and power centers with transformers that are either 
dry-type or contain nonflammable liquid, if they are located at or near 
the section and are moved as the working section advances or retreats;
    (2) Submersible pumps;
    (3) Permissible pumps and associated permissible switchgear;
    (4) Pumps located on or near the section and that are moved as the 
working section advances or retreats;
    (5) Pumps installed in anthracite mines; and
    (6) Small portable pumps.

Sec. 75.341  Direct-fired intake air heaters.

    (a) If any system used to heat intake air malfunctions, the heaters 
affected shall switch off automatically.
    (b) Thermal overload devices shall protect the blower motor from 
overheating.
    (c) The fuel supply shall turn off automatically if a flame-out 
occurs.
    (d) Each heater shall be located or guarded to prevent contact by 
persons and shall be equipped with a screen at the inlet to prevent 
combustible materials from passing over the burner units.
    (e) If intake air heaters use liquefied fuel systems--
    (1) Hydrostatic relief valves installed on vaporizers and on 
storage tanks shall be vented; and
    (2) Fuel storage tanks shall be located or protected to prevent 
fuel from leaking into the mine.
    (f) Following any period of 8 hours or more during which a heater 
does not operate, the heater and its associated components shall be 
examined within its first hour of operation. Additionally, each heater 
and its components shall be examined at least once each shift that the 
heater operates. The examination shall include measurement of the 
carbon monoxide concentration at the bottom of each shaft, slope, or in 
the drift opening where air is being heated. The measurements shall be 
taken by a person designated by the operator or by a carbon monoxide 
sensor that is calibrated with a known concentration of carbon monoxide 
and air at least once every 31 days. When the carbon monoxide 
concentration at this location reaches 50 parts per million, the heater 
causing the elevated carbon monoxide level shall be shut down.

Sec. 75.342  Methane monitors.

    (a)(1) MSHA approved methane monitors shall be installed on all 
face cutting machines, continuous miners, longwall face equipment, 
loading machines, and other mechanized equipment used to extract or 
load coal within the working place.
    (2) The sensing device for methane monitors on longwall shearing 
machines shall be installed at the return air end of the longwall face. 
An additional sensing device also shall be installed on the longwall 
shearing machine, downwind and as close to the cutting head as 
practicable. An alternative location or locations for the sensing 
device required on the longwall shearing machine may be approved in the 
ventilation plan.
    (3) The sensing devices of methane monitors shall be installed as 
close to the working face as practicable.
    (4) Methane monitors shall be maintained in permissible and proper 
operating condition and shall be calibrated with a known air-methane 
mixture at least once every 31 days. To assure that methane monitors 
are properly maintained and calibrated, the operator shall:
    (i) Use persons properly trained in the maintenance, calibration, 
and permissibility of methane monitors to calibrate and maintain the 
devices.
    (ii) Maintain a record of all calibration tests of methane 
monitors. Records shall be maintained in a secure book that is not 
susceptible to alteration or electronically in a computer system so as 
to be secure and not susceptible to alteration.
    (iii) Retain the record of calibration tests for 1 year from the 
date of the test. Records shall be retained at a surface location at 
the mine and made available for inspection by authorized 
representatives of the Secretary and the representative of miners.
    (b)(1) When the methane concentration at any methane monitor 
reaches 1.0 percent the monitor shall give a warning signal.
    (2) The warning signal device of the methane monitor shall be 
visible to a person who can deenergize the equipment on which the 
monitor is mounted.
    (c) The methane monitor shall automatically deenergize the machine 
on which it is mounted when--
    (1) The methane concentration at any methane monitor reaches 2.0 
percent; or
    (2) The monitor is not operating properly.

Sec. 75.343  Underground shops.

    (a) Underground shops shall be equipped with an automatic fire 
suppression system meeting the requirements of Sec. 75.1107-3 through 
Sec. 75.1107-16, or be enclosed in a noncombustible structure or area.
    (b) Underground shops shall be ventilated with intake air that is 
coursed directly into a return air course.

Sec. 75.344  Compressors.

    (a) Except compressors that are components of equipment such as 
locomotives and rock dusting machines and compressors of less than 5 
horsepower, electrical compressors including those that may start 
automatically shall be:
    (1) Continuously attended by a person designated by the operator 
who can see the compressor at all times during its operation. Any 
designated person attending the compressor shall be capable of 
activating the fire suppression system and deenergizing or shutting-off 
the compressor in the event of a fire; or,
    (2) Enclosed in a noncombustible structure or area which is 
ventilated by intake air coursed directly into a return air course or 
to the surface and equipped with sensors to monitor for heat and for 
carbon monoxide or smoke. The sensors shall deenergize power to the 
compressor, activate a visual and audible alarm located outside of and 
on the intake side of the enclosure, and activate doors to 
automatically enclose the noncombustible structure or area when either 
of the following occurs:
    (i) The temperature in the noncombustible structure or area reaches 
165  deg.F. 

[[Page 9837]]

    (ii) The carbon monoxide concentration reaches 10 parts per million 
above the ambient level for the area, or the optical density of smoke 
reaches 0.022 per meter. At least once every 31 days, sensors installed 
to monitor for carbon monoxide shall be calibrated with a known 
concentration of carbon monoxide and air sufficient to activate the 
closing door, and each smoke sensor shall be tested to determine that 
it functions correctly.
    (b) Compressors, except those exempted in paragraph (a), shall be 
equipped with a heat activated fire suppression system meeting the 
requirements of 75.1107-3 through 75.1107-16.
    (c) Two portable fire extinguishers or one extinguisher having at 
least twice the minimum capacity specified for a portable fire 
extinguisher in Sec. 75.1100-1(e) shall be provided for each 
compressor.
    (d) In addition to electrical compressors, this section shall apply 
to diesel compressors.
    (e) Notwithstanding the requirements of Sec. 75.1107-4, upon 
activation of any fire suppression system used under paragraph (b) of 
this section, the compressor shall be automatically deenergized or 
automatically shut off.

Sec. 75.350  Air courses and belt haulage entries.

    In any coal mine opened after March 30, 1970, the entries used as 
intake and return air courses shall be separated from belt haulage 
entries, and each operator of such mine shall limit the velocity of the 
air coursed through belt haulage entries to the amount necessary to 
provide an adequate supply of oxygen in such entries, and to insure 
that the air therein shall contain less than 1.0 volume per centum of 
methane, and such air shall not be used to ventilate active working 
places. Whenever an authorized representative of the Secretary finds, 
in the case of any coal mine opened on or prior to March 30, 1970, that 
has been developed with more than two entries, that the conditions in 
the entries, other than belt haulage entries, are such as to permit 
adequately the coursing of intake or return air through such entries:
    (a) The belt haulage entries shall not be used to ventilate, unless 
such entries are necessary to ventilate, active working places, and
    (b) When the belt haulage entries are not necessary to ventilate 
the active working places, the operator of such mine shall limit the 
velocity of the air coursed through the belt haulage entries to the 
amount necessary to provide an adequate supply of oxygen in such 
entries, and to assure that air therein shall contain less than 1.0 
volume per centum of methane.

Sec. 75.351  Atmospheric monitoring system (AMS).

    (a) Minimum requirements. An AMS shall consist of sensors to 
monitor the mine atmosphere and instruments at a surface location 
designated by the operator to receive information from the monitoring 
sensors. Each AMS installed in accordance with Secs. 75.323(d)(1)(ii), 
75.340(a)(2) and 75.362(f) shall do the following:
    (1) Monitor for circuit continuity and sensor function, and 
identify at the designated surface location any activated or 
malfunctioning sensor.
    (2) Signal a designated surface location at the mine when any 
interruption of circuit continuity occurs or any sensor malfunctions.
    (3) Signal affected working sections and the designated surface 
location when--
    (i) The carbon monoxide concentration at any carbon monoxide sensor 
reaches 5 parts per million above the established ambient level for 
that area; or
    (ii) The methane concentration at any methane monitoring station 
exceeds the maximum allowable concentration as specified for that 
location in Sec. 75.323.
    (4) Activate alarms at a designated surface location and affected 
working sections when the carbon monoxide concentration at any carbon 
monoxide sensor reaches 10 parts per million above the established 
ambient level for the area or when the optical density of smoke at any 
smoke sensor reaches 0.05 per meter.
    (b) Return splits. (1) If used to monitor return air splits under 
Sec. 75.362(f), AMS sensors shall monitor the mine atmosphere for 
percentage of methane in each return split of air from each working 
section between the last working place, or longwall or shortwall face, 
ventilated by that air split and the junction of that return air split 
with another air split, seal, or worked-out area. If auxiliary fans and 
tubing are used, the sensor also shall be located outby the auxiliary 
fan discharge.
    (2) If used to monitor air splits under Sec. 75.323(d)(1)(ii), AMS 
sensors shall monitor the mine atmosphere at the following locations:
    (i) In the return air course opposite the section loading point or, 
if auxiliary fans and tubing are used, in the return air course outby 
the auxiliary fans and a point opposite the section loading point.
    (ii) Immediately inby the location where the split of air meets 
another split of air, or inby the location where the split of air is 
used to ventilate seals or worked-out areas.
    (c) Electrical installations. If used to monitor the intake air 
ventilating underground transformer stations, battery charging 
stations, substations, rectifiers, or water pumps under 
Sec. 75.340(a)(2), at least one sensor shall be installed to monitor 
the mine atmosphere for carbon monoxide or smoke at least 50 feet and 
no more than 100 feet downstream in the direction of air flow.
    (d) Signals and alarms. (1) A person designated by the operator 
shall be at a surface location where the signals and alarms from the 
AMS can always be seen or heard while anyone is underground. This 
person shall have access to two-way communication with working sections 
and with other identifiable duty stations underground. A mine map 
showing the underground monitoring system shall be posted at the 
surface location.
    (2) If a signal from any AMS sensor is activated, the monitor 
producing the signal shall be identified, an examination shall be made 
to determine the cause of the activation, and appropriate action shall 
be taken.
    (e) Sensors. (1) Each carbon monoxide sensor shall be capable of 
detecting carbon monoxide in air at a level of 1 part per 
million throughout the operating range.
    (2) Each methane sensor shall be capable of detecting 1.0 percent 
methane in air with an accuracy of 0.2 percent methane.
    (3) Each smoke sensor shall be capable of detecting the optical 
density of smoke with an accuracy of 0.005 per meter.
    (f) Testing and calibration. At least once every 31 days--
    (1) Each carbon monoxide sensor shall be calibrated with a known 
concentration of carbon monoxide and air sufficient to activate an 
alarm;
    (2) Each smoke sensor shall be functionally tested;
    (3) Each methane sensor shall be calibrated with a known methane-
air mixture; and
    (4) Each oxygen sensor shall be calibrated with air having a known 
oxygen concentration.
    (g) Intrinsic Safety. Components of AMS installed in areas where 
permissible equipment is required shall be intrinsically safe.
    (h) Recordkeeping. If a signal device or alarm is activated, a 
record shall be made of the date, time, type of sensor, and the reason 
for its activation. Also the maximum concentration detected at 

[[Page 9838]]
the sensor producing the signal shall be recorded.
    (i) Retention period. Records shall be retained for at least 1 year 
at a surface location at the mine and made available for inspection by 
authorized representatives of the Secretary and representatives of 
miners.

Sec. 75.352  Return air courses.

    Entries used as return air courses shall be separated from belt 
haulage entries by permanent ventilation controls.

Sec. 75.360  Preshift examination.

    (a)(1) Except as provided in paragraph (a)(2) of this section, a 
certified person designated by the operator shall make a preshift 
examination within 3 hours preceding the beginning of any 8-hour 
interval during which any person is scheduled to work or travel 
underground. The operator shall establish the 8-hour intervals of time 
subject to the required preshift examinations. No person other than 
certified examiners may enter or remain in any underground area unless 
a preshift examination has been completed for the established 8-hour 
period.
    (2) Preshift examinations of areas where pumpers are scheduled to 
work or travel shall not be required prior to the pumper entering the 
areas if the pumper is a certified person and the pumper conducts an 
examination for hazardous conditions, tests for methane and oxygen 
deficiency and determines if the air is moving in its proper direction 
in the area where the pumper works or travels. The examination of the 
area must be completed before the pumper performs any other work. A 
record of all hazardous conditions found by the pumper shall be made 
and retained in accordance with Sec. 75.363.
    (b) The person conducting the preshift examination shall examine 
for hazardous conditions, test for methane and oxygen deficiency, and 
determine if the air is moving in its proper direction at the following 
locations:
    (1) Roadways, travelways and track haulageways where persons are 
scheduled, prior to the beginning of the preshift examination, to work 
or travel during the oncoming shift.
    (2) Belt conveyors that will be used to transport persons during 
the oncoming shift and the entries in which these belt conveyors are 
located.
    (3) Working sections and areas where mechanized mining equipment is 
being installed or removed, if anyone is scheduled to work on the 
section or in the area during the oncoming shift. The scope of the 
examination shall include the working places, approaches to worked-out 
areas and ventilation controls on these sections and in these areas, 
and the examination shall include tests of the roof, face and rib 
conditions on these sections and in these areas.
    (4) Approaches to worked-out areas along intake air courses and at 
the entries used to carry air into worked-out areas if the intake air 
passing the approaches is used to ventilate working sections where 
anyone is scheduled to work during the oncoming shift. The examination 
of the approaches to the worked-out areas shall be made in the intake 
air course immediately inby and outby each entry used to carry air into 
the worked-out area. An examination of the entries used to carry air 
into the worked-out areas shall be conducted at a point immediately 
inby the intersection of each entry with the intake air course.
    (5) Seals along intake air courses where intake air passes by a 
seal to ventilate working sections where anyone is scheduled to work 
during the oncoming shift.
    (6)(i) Entries and rooms developed after November 15, 1992, and 
developed more than 2 crosscuts off an intake air course without 
permanent ventilation controls where intake air passes through or by 
these entries or rooms to reach a working section where anyone is 
scheduled to work during the oncoming shift; and,
    (ii) Entries and rooms developed after November 15, 1992, and 
driven more than 20 feet off an intake air course without a crosscut 
and without permanent ventilation controls where intake air passes 
through or by these entries or rooms to reach a working section where 
anyone is scheduled to work during the oncoming shift.
    (7) Where unattended diesel equipment is to operate or areas where 
trolley wires or trolley feeder wires are to be or will remain 
energized during the oncoming shift.
    (8) High spots along intake air courses where methane is likely to 
accumulate, if equipment will be operated in the area during the shift.
    (9) Underground electrical installations referred to in 
Sec. 75.340(a), except those pumps listed in Sec. 75.340 (b)(2) through 
(b)(6), and areas where compressors subject to Sec. 75.344 are 
installed if the electrical installation or compressor is or will be 
energized during the shift.
    (10) Other areas where work or travel during the oncoming shift is 
scheduled prior to the beginning of the preshift examination.
    (c) The person conducting the preshift examination shall determine 
the volume of air entering each of the following areas if anyone is 
scheduled to work in the areas during the oncoming shift:
    (1) In the last open crosscut of each set of entries or rooms on 
each working section and areas where mechanized mining equipment is 
being installed or removed. The last open crosscut is the crosscut in 
the line of pillars containing the permanent stoppings that separate 
the intake air courses and the return air courses.
    (2) On each longwall or shortwall in the intake entry or entries at 
the intake end of the longwall or shortwall face immediately outby the 
face and the velocity of air at each end of the face at the locations 
specified in the approved ventilation plan.
    (3) At the intake end of any pillar line--
    (i) If a single split of air is used, in the intake entry furthest 
from the return air course, immediately outby the first open crosscut 
outby the line of pillars being mined; or
    (ii) If a split system is used, in the intake entries of each split 
immediately inby the split point.
    (d) The district manager may require the certified person to 
examine other areas of the mine or examine for other hazards during the 
preshift examination.
    (e) Certification. At each working place examined, the person doing 
the preshift examination shall certify by initials, date, and the time, 
that the examination was made. In areas required to be examined outby a 
working section, the certified person shall certify by initials, date, 
and the time at enough locations to show that the entire area has been 
examined.
    (f) Recordkeeping. A record of the results of each preshift 
examination, including a record of hazardous conditions and their 
locations found by the examiner during each examination and of the 
results and locations of air and methane measurements, shall be made on 
the surface before any persons, other than certified persons conducting 
examinations required by this subpart, enter any underground area of 
the mine. The results of methane tests shall be recorded as the 
percentage of methane measured by the examiner. The record shall be 
made by the certified person who made the examination or by a person 
designated by the operator. If the record is made by someone other than 
the examiner, the examiner shall verify the record by initials and date 
by or at the end of the shift for which the examination was made. A 
record shall also be made by a certified person of the action taken to 
correct hazardous conditions found during the preshift 

[[Page 9839]]
examination. All preshift and corrective action records shall be 
countersigned by the mine foreman or equivalent mine official by the 
end of the mine foreman's or equivalent mine official's next regularly 
scheduled working shift. The records required by this section shall be 
made in a secure book that is not susceptible to alteration or 
electronically in a computer system so as to be secure and not 
susceptible to alteration.
    (g) Retention period. Records shall be retained at a surface 
location at the mine for at least 1 year and shall be made available 
for inspection by authorized representatives of the Secretary and the 
representative of miners.

Sec. 75.361  Supplemental examination.

    (a) Except for certified persons conducting examinations required 
by this subpart, within 3 hours before anyone enters an area in which a 
preshift examination has not been made for that shift, a certified 
person shall examine the area for hazardous conditions, determine 
whether the air is traveling in its proper direction and at its normal 
volume, and test for methane and oxygen deficiency.
    (b) Certification. At each working place examined, the person 
making the supplemental examination shall certify by initials, date, 
and the time, that the examination was made. In areas required to be 
examined outby a working section, the certified person shall certify by 
initials, date, and the time at enough locations to show that the 
entire area has been examined.

Sec. 75.362  On-shift examination.

    (a) (1) At least once during each shift, or more often if necessary 
for safety, a certified person designated by the operator shall conduct 
an on-shift examination of each section where anyone is assigned to 
work during the shift and any area where mechanized mining equipment is 
being installed or removed during the shift. The certified person shall 
check for hazardous conditions, test for methane and oxygen deficiency, 
and determine if the air is moving in its proper direction.
    (2) A person designated by the operator shall conduct an 
examination to assure compliance with the respirable dust control 
parameters specified in the mine ventilation plan. In those instances 
when a shift change is accomplished without an interruption in 
production on a section, the examination shall be made anytime within 1 
hour of the shift change. In those instances when there is an 
interruption in production during the shift change, the examination 
shall be made before production begins on a section. Deficiencies in 
dust controls shall be corrected before production begins or resumes. 
The examination shall include air quantities and velocities, water 
pressures and flow rates, excessive leakage in the water delivery 
system, water spray numbers and orientations, section ventilation and 
control device placement, and any other dust suppression measures 
required by the ventilation plan. Additional measurements of the air 
velocity and quantity, water pressure and flow rates are not required 
if continuous monitoring of these controls is used and indicates that 
the dust controls are functioning properly.
    (b) During each shift that coal is produced, a certified person 
shall examine for hazardous conditions along each belt conveyor 
haulageway where a belt conveyor is operated. This examination may be 
conducted at the same time as the preshift examination of belt 
conveyors and belt conveyor haulageways, if the examination is 
conducted within 3 hours before the oncoming shift.
    (c) Persons conducting the on-shift examination shall determine at 
the following locations:
    (1) The volume of air in the last open crosscut of each set of 
entries or rooms on each section and areas where mechanized mining 
equipment is being installed or removed. The last open crosscut is the 
crosscut in the line of pillars containing the permanent stoppings that 
separate the intake air courses and the return air courses.
    (2) The volume of air on a longwall or shortwall, including areas 
where longwall or shortwall equipment is being installed or removed, in 
the intake entry or entries at the intake end of the longwall or 
shortwall.
    (3) The velocity of air at each end of the longwall or shortwall 
face at the locations specified in the approved ventilation plan.
    (4) The volume of air at the intake end of any pillar line--
    (i) Where a single split of air is used in the intake entry 
furthest from the return air course immediately outby the first open 
crosscut outby the line of pillars being mined; or
    (ii) Where a split system is used in the intake entries of each 
split immediately inby the split point.
    (d) (1) A qualified person shall make tests for methane--
    (i) At the start of each shift at each working place before 
electrically operated equipment is energized; and
    (ii) Immediately before equipment is energized, taken into, or 
operated in a working place; and
    (iii) At 20-minute intervals, or more often if required in the 
approved ventilation plan at specific locations, during the operation 
of equipment in the working place.
    (2) These methane tests shall be made at the face from under 
permanent roof support, using extendable probes or other acceptable 
means. When longwall or shortwall mining systems are used, these 
methane tests shall be made at the shearer, the plow, or the cutting 
head. When mining has been stopped for more than 20 minutes, methane 
tests shall be conducted prior to the start up of equipment.
    (e) If auxiliary fans and tubing are used, they shall be inspected 
frequently.
    (f) During each shift that coal is produced and at intervals not 
exceeding 4 hours, tests for methane shall be made by a certified 
person or by an atmospheric monitoring system (AMS) in each return 
split of air from each working section between the last working place, 
or longwall or shortwall face, ventilated by that split of air and the 
junction of the return air split with another air split, seal, or 
worked-out area. If auxiliary fans and tubing are used, the tests shall 
be made at a location outby the auxiliary fan discharge.
    (g) Certification. (1) The person conducting the on-shift 
examination in belt haulage entries shall certify by initials, date, 
and time that the examination was made. The certified person shall 
certify by initials, date, and the time at enough locations to show 
that the entire area has been examined.
    (2) The person directing the on-shift examination to assure 
compliance with the respirable dust control parameters specified in the 
mine ventilation plan shall certify by initials, date, and time that 
the examination was made.

Sec. 75.363  Hazardous conditions; posting, correcting and recording.

    (a) Any hazardous condition found by the mine foreman or equivalent 
mine official, assistant mine foreman or equivalent mine official, or 
other certified persons designated by the operator for the purposes of 
conducting examinations under this subpart D, shall be posted with a 
conspicuous danger sign where anyone entering the areas would pass. A 
hazardous condition, other than one detected during a preshift 
examination or an examination conducted following a fan stoppage and 
restart under Sec. 75.313(d)(1)(i), shall be corrected immediately or 
the area shall remain posted until the hazardous condition is 
corrected. If the condition creates an imminent danger, everyone except 
those persons referred to in 

[[Page 9840]]
section 104(c) of the Act shall be withdrawn from the area affected to 
a safe area until the hazardous condition is corrected. Only persons 
designated by the operator to correct or evaluate the condition may 
enter the posted area.
    (b) A record shall be made of any hazardous condition found. This 
record shall be kept in a book maintained for this purpose on the 
surface at the mine. The record shall be made by the completion of the 
shift on which the hazardous condition is found and shall include the 
nature and location of the hazardous condition and the corrective 
action taken. This record shall not be required for shifts when no 
hazardous conditions are found or for hazardous conditions found during 
the preshift or weekly examinations inasmuch as these examinations have 
separate recordkeeping requirements.
    (c) The record shall be made by the certified person who conducted 
the examination or a person designated by the operator. If made by a 
person other than the certified person, the certified person shall 
verify the record by initials and date by or at the end of the shift 
for which the examination was made. Records shall be countersigned by 
the mine foreman or equivalent mine official by the end of the mine 
foreman's or equivalent mine official's next regularly scheduled 
working shift. The record shall be made in a secure book that is not 
susceptible to alteration or electronically in a computer system so as 
to be secure and not susceptible to alteration.
    (d) Retention period. Records shall be retained at a surface 
location at the mine for at least 1 year and shall be made available 
for inspection by authorized representatives of the Secretary and the 
representative of miners.

Sec. 75.364  Weekly examination.

    (a) Worked-out areas. (1) At least every 7 days, a certified person 
shall examine unsealed worked-out areas where no pillars have been 
recovered by traveling to the area of deepest penetration; measuring 
methane and oxygen concentrations and air quantities and making tests 
to determine if the air is moving in the proper direction in the area. 
The locations of measurement points where tests and measurements will 
be performed shall be included in the mine ventilation plan and shall 
be adequate in number and location to assure ventilation and air 
quality in the area. Air quantity measurements shall also be made where 
the air enters and leaves the worked-out area. An alternative method of 
evaluating the ventilation of the area may be approved in the 
ventilation plan.
    (2) At least every 7 days, a certified person shall evaluate the 
effectiveness of bleeder systems required by Sec. 75.334 as follows:
    (i) Measurements of methane and oxygen concentrations and air 
quantity and a test to determine if the air is moving in its proper 
direction shall be made where air enters the worked-out area.
    (ii) Measurements of methane and oxygen concentrations and air 
quantity and a test to determine if the air is moving in the proper 
direction shall be made immediately before the air enters a return 
split of air.
    (iii) At least one entry of each set of bleeder entries used as 
part of a bleeder system under Sec. 75.334 shall be traveled in its 
entirety. Measurements of methane and oxygen concentrations and air 
quantities and a test to determine if the air is moving in the proper 
direction shall be made at the measurement point locations specified in 
the mine ventilation plan to determine the effectiveness of the bleeder 
system.
    (iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) 
of this section, an alternative method of evaluation may be specified 
in the ventilation plan provided the alternative method results in 
proper evaluation of the effectiveness of the bleeder system.
    (b) Hazardous conditions. At least every 7 days, an examination for 
hazardous conditions at the following locations shall be made by a 
certified person designated by the operator:
    (1) In at least one entry of each intake air course, in its 
entirety, so that the entire air course is traveled.
    (2) In at least one entry of each return air course, in its 
entirety, so that the entire air course is traveled.
    (3) In each longwall or shortwall travelway in its entirety, so 
that the entire travelway is traveled.
    (4) At each seal along return and bleeder air courses and at each 
seal along intake air courses not examined under Sec. 75.360(b)(5).
    (5) In each escapeway so that the entire escapeway is traveled.
    (6) On each working section not examined under Sec. 75.360(b)(3) 
during the previous 7 days.
    (7) At each water pump not examined during a preshift examination 
conducted during the previous 7 days.
    (c) Measurements and tests. At least every 7 days, a certified 
person shall--
    (1) Determine the volume of air entering the main intakes and in 
each intake split;
    (2) Determine the volume of air and test for methane in the last 
open crosscut in any pair or set of developing entries or rooms, in the 
return of each split of air immediately before it enters the main 
returns, and where the air leaves the main returns; and
    (3) Test for methane in the return entry nearest each set of seals 
immediately after the air passes the seals.
    (d) Hazardous conditions shall be corrected immediately. If the 
condition creates an imminent danger, everyone except those persons 
referred to in Sec. 104(c) of the Act shall be withdrawn from the area 
affected to a safe area until the hazardous condition is corrected.
    (e) The weekly examination may be conducted at the same time as the 
preshift or on-shift examinations.
    (f) (1) The weekly examination is not required during any 7 day 
period in which no one enters any underground area of the mine.
    (2) Except for certified persons required to make examinations, no 
one shall enter any underground area of the mine if a weekly 
examination has not been completed within the previous 7 days.
    (g) Certification. The person making the weekly examinations shall 
certify by initials, date, and the time that the examination was made. 
Certifications and times shall appear at enough locations to show that 
the entire area has been examined.
    (h) Recordkeeping. At the completion of any shift during which a 
portion of a weekly examination is conducted, a record of the results 
of each weekly examination, including a record of hazardous conditions 
found during each examination and their locations, the corrective 
action taken, and the results and location of air and methane 
measurements, shall be made. The results of methane tests shall be 
recorded as the percentage of methane measured by the examiner. The 
record shall be made by the person making the examination or a person 
designated by the operator. If made by a person other than the 
examiner, the examiner shall verify the record by the initials and date 
by or at the end of the shift for which the examination was made. The 
record shall be countersigned by the mine foreman or equivalent mine 
official by the end of the mine foreman's or equivalent mine official's 
next regularly scheduled working shift. The records required by this 
section shall be made in a secure book that is not susceptible to 
alteration or electronically in a computer system so as to be secure 
and not susceptible to alteration.
    (i) Retention period. Records shall be retained at a surface 
location at the mine for at least 1 year and shall be made available 
for inspection by authorized 

[[Page 9841]]
representatives of the Secretary and the representative of miners.

Sec. 75.370  Mine ventilation plan; submission and approval.

    (a) (1) The operator shall develop and follow a ventilation plan 
approved by the district manager. The plan shall be designed to control 
methane and respirable dust and shall be suitable to the conditions and 
mining system at the mine. The ventilation plan shall consist of two 
parts, the plan content as prescribed in Sec. 75.371 and the 
ventilation map with information as prescribed in Sec. 75.372. Only 
that portion of the map which contains information required under 
Sec. 75.371 will be subject to approval by the district manager.
    (2) The proposed ventilation plan and any revision to the plan 
shall be submitted in writing to the district manager. When revisions 
to a ventilation plan are proposed, only the revised pages, maps, or 
sketches of the plan need to be submitted. When required in writing by 
the district manager, the operator shall submit a fully revised plan by 
consolidating the plan and all revisions in an orderly manner and by 
deleting all outdated material.
    (3) (i) The mine operator shall notify the representative of miners 
at least 5 days prior to submission of a mine ventilation plan and any 
revision to a mine ventilation plan. If requested, the mine operator 
shall provide a copy to the representative of miners at the time of 
notification. In the event of a situation requiring immediate action on 
a plan revision, notification of the revision shall be given, and if 
requested, a copy of the revision shall be provided, to the 
representative of miners by the operator at the time of submittal;
    (ii) A copy of the proposed ventilation plan, and a copy of any 
proposed revision, submitted for approval shall be made available for 
inspection by the representative of miners; and
    (iii) A copy of the proposed ventilation plan, and a copy of any 
proposed revision, submitted for approval shall be posted on the mine 
bulletin board at the time of submittal. The proposed plan or proposed 
revision shall remain posted until it is approved, withdrawn or denied.
    (b) Following receipt of the proposed plan or proposed revision, 
the representative of miners may submit timely comments to the district 
manager, in writing, for consideration during the review process. A 
copy of these comments shall also be provided to the operator by the 
district manager upon request.
    (c) (1) The district manager will notify the operator in writing of 
the approval or denial of approval of a proposed ventilation plan or 
proposed revision. A copy of this notification will be sent to the 
representative of miners by the district manager.
    (2) If the district manager denies approval of a proposed plan or 
revision, the deficiencies of the plan or revision shall be specified 
in writing and the operator will be provided an opportunity to discuss 
the deficiencies with the district manager.
    (d) No proposed ventilation plan shall be implemented before it is 
approved by the district manager. Any intentional change to the 
ventilation system that alters the main air current or any split of the 
main air current in a manner that could materially affect the safety 
and health of the miners, or any change to the information required in 
Sec. 75.371 shall be submitted to and approved by the district manager 
before implementation.
    (e) Before implementing an approved ventilation plan or a revision 
to a ventilation plan, persons affected by the revision shall be 
instructed by the operator in its provisions.
    (f) The approved ventilation plan and any revisions shall be--
    (1) Provided upon request to the representative of miners by the 
operator following notification of approval;
    (2) Made available for inspection by the representative of miners; 
and
    (3) Posted on the mine bulletin board within 1 working day 
following notification of approval. The approved plan and revisions 
shall remain posted on the bulletin board for the period that they are 
in effect.
    (g) The ventilation plan for each mine shall be reviewed every 6 
months by an authorized representative of the Secretary to assure that 
it is suitable to current conditions in the mine.

Sec. 75.371  Mine ventilation plan; contents.

    The mine ventilation plan shall contain the information described 
below and any additional provisions required by the district manager:
    (a) The mine name, company name, mine identification number, and 
the name of the individual submitting the plan information.
    (b) Planned main mine fan stoppages, other than those scheduled for 
testing, maintenance or adjustment, including procedures to be followed 
during these stoppages and subsequent restarts (see Sec. 75.311(a)) and 
the type of device to be used for monitoring main mine fan pressure, if 
other than a pressure recording device (see 75.310(a)(4)).
    (c) Methods of protecting main mine fans and associated components 
from the forces of an underground explosion if a 15-foot offset from 
the nearest side of the mine opening is not provided (see 
Sec. 75.310(a)(6)); and the methods of protecting main mine fans and 
intake air openings if combustible material will be within 100 feet of 
the area surrounding the fan or these openings (see Sec. 75.311(f)).
    (d) Persons that will be permitted to enter the mine, the work 
these persons will do while in the mine, and electric power circuits 
that will be energized when a back-up fan system is used that does not 
provide the ventilating quantity provided by the main mine fan (see 
Sec. 75.311(c)).
    (e) The locations and operating conditions of booster fans 
installed in anthracite mines (see Sec. 75.302).
    (f) Section and face ventilation systems used, including drawings 
illustrating how each system is used, and a description of each 
different dust suppression system used on equipment on working 
sections.
    (g) Locations where the air quantities must be greater than 3,000 
cubic feet per minute (see Sec. 75.325(a)(1)).
    (h) In anthracite mines, locations where the air quantities must be 
greater than 1,500 cubic feet per minute (see Sec. 75.325(e)(1)).
    (i) Working places and working faces other than those where coal is 
being cut, mined, drilled for blasting or loaded, where a minimum air 
quantity will be maintained, and the air quantity at those locations 
(see Sec. 75.325(a)(1)).
    (j) The operating volume of machine mounted dust collectors or 
diffuser fans, if used (see Sec. 75.325(a)(3)).
    (k) The minimum mean entry air velocity in exhausting face 
ventilation systems where coal is being cut, mined, drilled for 
blasting, or loaded, if the velocity will be less than 60 feet per 
minute. Other working places where coal is not being cut, mined, 
drilled for blasting or loaded, where at least 60 feet per minute or 
some other minimum mean entry air velocity will be maintained (see 
Sec. 75.326).
    (l) The maximum distance if greater than 10 feet from each working 
face at which face ventilation control devices will be installed (see 
Sec. 75.330(b)(2)). The working places other than those where coal is 
being cut, mined, drilled for blasting or loaded, where face 
ventilation control devices will be used (see Sec. 75.330(b)(1)(ii).
    (m) The volume of air required in the last open crosscut or the 
quantity of air reaching the pillar line if greater than 9,000 cubic 
feet per minute (see Sec. 75.325(b)). 

[[Page 9842]]

    (n) In anthracite mines, the volume of air required in the last 
open crosscut or the quantity of air reaching the pillar line if 
greater than 5,000 cubic feet per minute (see Sec. 75.325(e)(2)).
    (o) Locations where separations of intake and return air courses 
will be built and maintained to other than the third connecting 
crosscut outby each working face (see Sec. 75.333(b)(1)).
    (p) The volume of air required at the intake to the longwall 
sections, if different than 30,000 cubic feet per minute (see 
Sec. 75.325(c)).
    (q) The velocities of air on a longwall or shortwall face, and the 
locations where the velocities must be measured (see 
Sec. 75.325(c)(2)).
    (r) The minimum quantity of air that will be provided during the 
installation and removal of mechanized mining equipment, the location 
where this quantity will be provided, and the ventilation controls that 
will be used. (see Sec. 75.325(d)).
    (s) The locations and frequency of the methane tests if required 
more often by Sec. 75.362(d)(1)(iii) (see Sec. 75.362 (d)(1)(iii).
    (t) The locations where samples for ``designated areas'' will be 
collected, including the specific location of each sampling device, and 
the respirable dust control measures used at the dust generating 
sources for these locations (see Sec. 70.208 of this chapter).
    (u) The methane and dust control systems at underground dumps, 
crushers, transfer points, and haulageways.
    (v) Areas in trolley haulage entries where the air velocity will be 
greater than 250 feet per minute and the velocity in these areas (see 
Sec. 75.327(b)).
    (w) Locations where entries will be advanced less than 20 feet from 
the inby rib without a crosscut being provided where a line brattice 
will be required. (see Sec. 75.333(g)).
    (x) A description of the bleeder system to be used, including its 
design (see Sec. 75.334).
    (y) The means for determining the effectiveness of bleeder systems 
(see Sec. 75.334(c)(2)).
    (z) The locations where measurements of methane and oxygen 
concentrations and air quantities and tests to determine whether the 
air is moving in the proper direction will be made to evaluate the 
ventilation of nonpillared worked-out areas (see Sec. 75.364 (a)(1)) 
and the effectiveness of bleeder systems (see Sec. 75.364 (a)(2)(iii). 
Alternative methods of evaluation of the effectiveness of bleeder 
systems (Sec. 75.364 (a)(2)(iv)).
    (aa) The means for adequately maintaining bleeder entries free of 
obstructions such as roof falls and standing water (see 
Sec. 75.334(c)(3)).
    (bb) The location of ventilation devices such as regulators, 
stoppings and bleeder connectors used to control air movement through 
worked-out areas (see Sec. 75.334(c)(4)). The location and sequence of 
construction of proposed seals for each worked-out area. (see 
Sec. 75.334(e)).
    (cc) In mines with a demonstrated history of spontaneous 
combustion: a description of the measures that will be used to detect 
methane, carbon monoxide, and oxygen concentration during and after 
pillar recovery and in worked-out areas where no pillars have been 
recovered (see Sec. 75.334(f)(1); and, the actions which will be taken 
to protect miners from the hazards associated with spontaneous 
combustion (see Sec. 75.334(f)(2). If a bleeder system will not be 
used, the methods that will be used to control spontaneous combustion, 
accumulations of methane-air mixtures, and other gases, dusts, and 
fumes in the worked-out area (see Sec. 75.334(f)(3)).
    (dd) The location of all horizontal degasification holes that are 
longer than 1,000 feet and the location of all vertical degasification 
holes.
    (ee) If methane drainage systems are used, a detailed sketch of 
each system, including a description of safety precautions used with 
the systems.
    (ff) A description of the methods and materials to be used to seal 
worked-out areas if those methods or materials will be different from 
those specified by Sec. 75.335(a)(1).
    (gg) The alternative location for the additional sensing device if 
the device will not be installed on the longwall shearing machine (see 
Sec. 75.342(a)(2)).
    (hh) The ambient level in parts per million of carbon monoxide, and 
the method for determining the ambient level, in all areas where carbon 
monoxide sensors are installed.
    (ii) The distance that separation between the primary escapeway and 
the belt or track haulage entries will be maintained if other than to 
the first connecting crosscut outby the section loading point (see 
Sec. 75.380(g)).
    (jj) In anthracite mines, the dimensions of escapeways where the 
pitch of the coal seam does not permit escapeways to be maintained 4 
feet by 5 feet and the locations where these dimensions must be 
maintained (see Sec. 75.381(c)(4)).

Sec. 75.372  Mine ventilation map.

    (a)(1) At intervals not exceeding 12 months, the operator shall 
submit to the district manager 3 copies of an up-to-date map of the 
mine drawn to a scale of not less than 100 nor more than 500 feet to 
the inch. A registered engineer or a registered surveyor shall certify 
that the map is accurate.
    (2) In addition to the informational requirements of this section 
the map may also be used to depict and explain plan contents that are 
required in Sec. 75.371. Information shown on the map to satisfy the 
requirements of Sec. 75.371 shall be subject to approval by the 
district manager.
    (b) The map shall contain the following information:
    (1) The mine name, company name, mine identification number, a 
legend identifying the scale of the map and symbols used, and the name 
of the individual responsible for the information on the map.
    (2) All areas of the mine, including sealed and unsealed worked-out 
areas.
    (3) All known mine workings that are located in the same coalbed 
within 1,000 feet of existing or projected workings. These workings may 
be shown on a mine map with a scale other than that required by 
paragraph (a) of this section, if the scale does not exceed 2,000 feet 
to the inch and is specified on the map.
    (4) The locations of all known mine workings underlying and 
overlying the mine property and the distance between the mine workings.
    (5) The locations of all known oil and gas wells and all known 
drill holes that penetrate the coalbed being mined.
    (6) The locations of all main mine fans, installed backup fans and 
motors, and each fan's specifications, including size, type, model 
number, manufacturer, operating pressure, motor horsepower, and 
revolutions per minute.
    (7) The locations of all surface mine openings and the direction 
and quantity of air at each opening.
    (8) The elevation at the top and bottom of each shaft and slope, 
and shaft and slope dimensions, including depth and length.
    (9) The direction of air flow in all underground areas of the mine.
    (10) The locations of all active working sections and the four-
digit identification number for each mechanized mining unit (MMU).
    (11) The location of all escapeways.
    (12) The locations of all ventilation controls, including permanent 
stoppings, overcasts, undercasts, regulators, seals, airlock doors, 
haulageway doors and other doors, except temporary ventilation controls 
on working sections.
    (13) The direction and quantity of air--
    (i) Entering and leaving each split;
    (ii) In the last open crosscut of each set of entries and rooms; 
and 

[[Page 9843]]

    (iii) At the intake end of each pillar line, including any longwall 
or shortwall.
    (14) Projections for at least 12 months of anticipated mine 
development, proposed ventilation controls, proposed bleeder systems, 
and the anticipated location of intake and return air courses, belt 
entries, and escapeways.
    (15) The locations of existing methane drainage systems.
    (16) The locations of all atmospheric monitoring system sensors.
    (17) Contour lines that pass through whole number elevations of the 
coalbed being mined. These lines shall be spaced at 10-foot elevation 
levels unless a wider spacing is permitted by the district manager.
    (18) The location of proposed seals for each worked-out area.
    (19) The entry height, velocity and direction of the air current at 
or near the midpoint of each belt flight where the height and width of 
the entry are representative of the belt haulage entry.
    (20) The location and designation of air courses that have been 
redesignated from intake to return for the purpose of ventilation of 
structures, areas or installations that are required by this subpart D 
to be ventilated to return air courses, and for ventilation of seals.
    (c) The mine map required by Sec. 75.1200 may be used to satisfy 
the requirements for the ventilation map, provided that all the 
information required by this section is contained on the map.

Sec. 75.373  Reopening mines.

    After a mine is abandoned or declared inactive, and before it is 
reopened, mining operations shall not begin until MSHA has been 
notified and has completed an inspection.

Sec. 75.380  Escapeways; bituminous and lignite mines.

    (a) Except in situations addressed in Sec. 75.381, Sec. 75.385 and 
Sec. 75.386, at least two separate and distinct travelable passageways 
shall be designated as escapeways and shall meet the requirements of 
this section.
    (b) (1) Escapeways shall be provided from each working section, and 
each area where mechanized mining equipment is being installed or 
removed, continuous to the surface escape drift opening or continuous 
to the escape shaft or slope facilities to the surface.
    (2) During equipment installation, these escapeways shall begin at 
the projected location for the section loading point. During equipment 
removal, they shall begin at the location of the last loading point.
    (c) The two separate and distinct escapeways required by this 
section shall not end at a common shaft, slope, or drift opening, 
except that multiple compartment shafts or slopes separated by walls 
constructed of noncombustible material may be used as separate and 
distinct passageways.
    (d) Each escapeway shall be--
    (1) Maintained in a safe condition to always assure passage of 
anyone, including disabled persons;
    (2) Clearly marked to show the route and direction of travel to the 
surface;
    (3) Maintained to at least a height of 5 feet from the mine floor 
to the mine roof, excluding the thickness of any roof support, except 
that the escapeways shall be maintained to at least the height of the 
coalbed, excluding the thickness of any roof support, where the coalbed 
is less than 5 feet. In areas of mines where escapeways pass through 
doors, the height may be less than 5 feet, provided that sufficient 
height is maintained to enable miners, including disabled persons, to 
escape quickly in an emergency. In areas of mines developed before 
November 16, 1992, where escapeways pass over or under overcasts or 
undercasts, the height may be less than 5 feet provided that sufficient 
height is maintained to enable miners, including disabled persons, to 
escape quickly in an emergency. When there is a need to determine 
whether sufficient height is provided, MSHA may require a stretcher 
test where 4 persons carry a miner through the area in question on a 
stretcher;
    (4) Maintained at least 6 feet wide except--
    (i) Where necessary supplemental roof support is installed, the 
escapeway shall not be less than 4 feet wide; or
    (ii) Where the route of travel passes through doors or other 
permanent ventilation controls, the escapeway shall be at least 4 feet 
wide to enable miners to escape quickly in an emergency, or
    (iii) Where the alternate escapeway passes through doors or other 
permanent ventilation controls or where supplemental roof support is 
required and sufficient width is maintained to enable miners, including 
disabled persons, to escape quickly in an emergency. When there is a 
need to determine whether sufficient width is provided, MSHA may 
require a stretcher test where 4 persons carry a miner through the area 
in question on a stretcher, or
    (iv) Where mobile equipment near working sections, and other 
equipment essential to the ongoing operation of longwall sections, is 
necessary during normal mining operations, such as material cars 
containing rock dust or roof control supplies, or is to be used for the 
evacuation of m
FR Doc. 96-5453 Safety Standards for Underground Coal Mine Ventilation
iners off the section in the event of an emergency. In 
any instance, escapeways shall be of sufficient width to enable miners, 
including disabled persons, to escape quickly in an emergency. When 
there is a need to determine whether sufficient width is provided, MSHA 
may require a stretcher test where 4 persons carry a miner through the 
area in question on a stretcher;
    (5) Located to follow the most direct, safe and practical route to 
the nearest mine opening suitable for the safe evacuation of miners; 
and
    (6) Provided with ladders, stairways, ramps, or similar facilities 
where the escapeways cross over obstructions.
    (e) Surface openings shall be adequately protected to prevent 
surface fires, fumes, smoke, and flood water from entering the mine.
    (f) Primary escapeway. (1) One escapeway that is ventilated with 
intake air shall be designated as the primary escapeway.
    (2) Paragraphs (f)(3) through (f)(7) of this section apply as 
follows:
    (i) To all areas of a primary escapeway developed on or after 
November 16, 1992;
    (ii) Effective as of March 11, 1997, to all areas of a primary 
escapeway developed between March 30, 1970 and November 16, 1992; and
    (iii) Effective as of March 11, 1997, to all areas of the primary 
escapeway developed prior to March 30, 1970 where separation of the 
belt and trolley haulage entries from the primary escapeway existed 
prior to November 16, 1992.
    (3) The following equipment is not permitted in the primary 
escapeway:
    (i) Unattended operating diesel equipment without an automatic fire 
suppression system.
    (ii) Mobile equipment hauling coal except for hauling coal 
incidental to cleanup or maintenance of the primary escapeway.
    (iii) Compressors, except--
    (A) Compressors necessary to maintain the escapeway in safe, 
travelable condition;
    (B) Compressors that are components of equipment such as 
locomotives and rock dusting machines; and
    (C) Compressors of less than five horsepower.
    (iv) Underground transformer stations, battery charging stations, 
substations, and rectifiers except--
    (A) Where necessary to maintain the escapeway in safe, travelable 
condition; and
    (B) Battery charging stations and rectifiers and power centers with 

[[Page 9844]]
transformers that are either dry-type or contain nonflammable liquid, 
provided they are located on or near a working section and are moved as 
the section advances or retreats.
    (v) Water pumps, except--
    (A) Water pumps necessary to maintain the escapeway in safe, 
travelable condition;
    (B) Submersible pumps;
    (C) Permissible pumps and associated permissible switchgear;
    (D) Pumps located on or near a working section that are moved as 
the section advances or retreats;
    (E) Pumps installed in anthracite mines; and
    (F) Small portable pumps.
    (4) Mobile equipment operated in the primary escapeway, except for 
continuous miners and as provided in paragraphs (f)(5), (f)(6), and 
(f)(7) of this section, shall be equipped with a fire suppression 
system installed according to Secs. 75.1107-3 through 75.1107-16 that 
is--
    (i) Manually operated and attended continuously by a person trained 
in the systems function and use, or
    (ii) A multipurpose dry chemical type capable of both automatic and 
manual activation.
    (5) Personnel carriers and small mobile equipment designed and used 
only for carrying people and small hand tools may be operated in 
primary escapeways if--
    (i) The equipment is provided with a multipurpose dry chemical type 
fire suppression system capable of both automatic and manual 
activation, and the suppression system is suitable for the intended 
application and is listed or approved by a nationally recognized 
independent testing laboratory, or,
    (ii) Battery powered and provided with two 10 pound multipurpose 
dry chemical portable fire extinguishers.
    (6) Notwithstanding the requirements of paragraph (f)(3)(i), mobile 
equipment not provided with a fire suppression system may operate in 
the primary escapeway if no one is inby except those persons directly 
engaged in using or moving the equipment.
    (7) Notwithstanding the requirements of paragraph (f)(3)(i), mobile 
equipment designated and used only as emergency vehicles or ambulances, 
may be operated in the primary escapeway without fire suppression 
systems.
    (g) Except where separation of belt and trolley haulage entries 
from designated escapeways did not exist before November 15, 1992, the 
primary escapeway shall be separated from belt and trolley haulage 
entries for its entire length, to and including the first connecting 
crosscut outby each loading point except when a greater or lesser 
distance for this separation is specified and approved in the 
ventilation plan and does not pose a hazard to miners.
    (h) Alternate escapeway. One escapeway shall be designated as the 
alternate escapeway. The alternate escapeway shall be separated from 
the primary escapeway for its entire length, except that the alternate 
and primary escapeways may be ventilated from a common intake air shaft 
or slope opening.
    (i) Mechanical escape facilities shall be provided and maintained 
for--
    (1) Each shaft that is part of a designated escapeway and is 
greater than 50 feet in depth; and
    (2) Each slope from the coal seam to the surface that is part of a 
designated escapeway and is inclined more than 9 degrees from the 
horizontal.
    (j) Within 30 minutes after mine personnel on the surface have been 
notified of an emergency requiring evacuation, mechanical escape 
facilities provided under paragraph (i) of this section shall be 
operational at the bottom of shaft and slope openings that are part of 
escapeways.
    (k) Except where automatically activated hoisting equipment is 
used, the bottom of each shaft or slope opening that is part of a 
designated escapeway shall be equipped with a means of signaling a 
surface location where a person is always on duty when anyone is 
underground. When the signal is activated or the evacuation of persons 
underground is necessary, the person shall assure that mechanical 
escape facilities are operational as required by paragraph (j) of this 
section.
    (l) (1) Stairways or mechanical escape facilities shall be 
installed in shafts that are part of the designated escapeways and that 
are 50 feet or less in depth, except ladders may be used in shafts that 
are part of the designated escapeways and that are 5 feet or less in 
depth.
    (2) Stairways shall be constructed of concrete or metal, set on an 
angle not to exceed 45 degrees from the horizontal, and equipped on the 
open side with handrails. In addition, landing platforms that are at 
least 2 feet by 4 feet shall be installed at intervals not to exceed 20 
vertical feet on the stairways and equipped on the open side with 
handrails.
    (3) Ladders shall be constructed of metal, anchored securely, and 
set on an angle not to exceed 60 degrees from the horizontal.
    (m) A travelway designed to prevent slippage shall be provided in 
slope and drift openings that are part of designated escapeways, unless 
mechanical escape facilities are installed.

Sec. 75.381  Escapeways; anthracite mines.

    (a) Except as provided in Secs. 75.385 and 75.386, at least two 
separate and distinct travelable passageways shall be designated as 
escapeways and shall meet the requirements of this section.
    (b) Escapeways shall be provided from each working section 
continuous to the surface.
    (c) Each escapeway shall be--
    (1) Maintained in a safe condition to always assure passage of 
anyone, including disabled persons;
    (2) Clearly marked to show the route of travel to the surface;
    (3) Provided with ladders, stairways, ramps, or similar facilities 
where the escapeways cross over obstructions; and
    (4) Maintained at least 4 feet wide by 5 feet high. If the pitch or 
thickness of the coal seam does not permit these dimensions to be 
maintained other dimensions may be approved in the ventilation plan.
    (d) Surface openings shall be adequately protected to prevent 
surface fires, fumes, smoke, and flood water from entering the mine.
    (e) Primary escapeway. One escapeway that shall be ventilated with 
intake air shall be designated as the primary escapeway.
    (f) Alternate escapeway. One escapeway that shall be designated as 
the alternate escapeway shall be separated from the primary escapeway 
for its entire length.
    (g) Mechanical escape facilities shall be provided--
    (1) For each shaft or slope opening that is part of a primary 
escapeway; and
    (2) For slopes that are part of escapeways, unless ladders are 
installed.
    (h) Within 30 minutes after mine personnel on the surface have been 
notified of an emergency requiring evacuation, mechanical escape 
facilities shall be operational at the bottom of each shaft and slope 
opening that is part of an escapeway.
    (i) Except where automatically activated hoisting equipment is 
used, the bottom of each shaft or slope opening that is part of a 
primary escapeway shall be equipped with a means of signaling a surface 
location where a person is always on duty when anyone is underground. 
When the signal is activated or the evacuation of personnel is 
necessary, the person on duty shall assure that mechanical escape 
facilities are operational as required by paragraph (h) of this 
section. 

[[Page 9845]]

Sec. 75.382  Mechanical escape facilities.

    (a) Mechanical escape facilities shall be provided with overspeed, 
overwind, and automatic stop controls.
    (b) Every mechanical escape facility with a platform, cage, or 
other device shall be equipped with brakes that can stop the fully 
loaded platform, cage, or other device.
    (c) Mechanical escape facilities, including automatic elevators, 
shall be examined weekly. The weekly examination of this equipment may 
be conducted at the same time as a daily examination required by 
Sec. 75.1400-3.
    (1) The weekly examination shall include an examination of the 
headgear, connections, links and chains, overspeed and overwind 
controls, automatic stop controls, and other facilities.
    (2) At least once each week, the hoist shall be run through one 
complete cycle of operation to determine that it is operating properly.
    (d) A person trained to operate the mechanical escape facility 
always shall be available while anyone is underground to provide the 
mechanical escape facilities, if required, to the bottom of each shaft 
and slope opening that is part of an escapeway within 30 minutes after 
personnel on the surface have been notified of an emergency requiring 
evacuation. However, no operator is required for automatically operated 
cages, platforms, or elevators.
    (e) Mechanical escape facilities shall have rated capacities 
consistent with the loads handled.
    (f) Manually-operated mechanical escape facilities shall be 
equipped with indicators that accurately and reliably show the position 
of the facility.
    (g) Certification. The person making the examination as required by 
paragraph (c) of this section shall certify by initials, date, and the 
time that the examination was made. Certifications shall be made at or 
near the facility examined.

Sec. 75.383  Escapeway maps and drills.

    (a) A map shall be posted or readily accessible to all miners in 
each working section, and in each area where mechanized mining 
equipment is being installed or removed. The map shall show the 
designated escapeways from the working section to the location where 
miners must travel to satisfy the escapeway drill specified in 
paragraph (b)(1) of this section. A map showing the main escapeways 
shall be posted at a surface location of the mine where miners 
congregate, such as at the mine bulletin board, bathhouse, or waiting 
room. All maps shall be kept up to date, and any changes in route of 
travel, locations of doors, or directions of airflow shall be shown on 
the maps by the end of the shift on which the changes are made, and 
affected miners shall be informed of the changes before entering the 
underground areas of the mine. Miners underground on a shift when any 
such change is made shall be immediately notified of the change.
    (b) (1) At least once every 90 days, each miner, including miners 
with working stations located between working sections and main 
escapeways, shall participate in a practice escapeway drill. During 
this drill, each miner shall travel the primary or alternate escapeway 
from the miner's working section or area where mechanized mining 
equipment is being installed or removed, to the area where the split of 
air ventilating the working section intersects a main air course, or 
2,000 feet outby the section loading point, whichever distance is 
greater. Other miners shall participate in the escapeway drill by 
traveling in the primary or alternate escapeway for a distance of 2,000 
feet from their working station toward the nearest escape facility or 
drift opening. An escapeway drill shall not be conducted in the same 
escapeway as the immediately preceding drill.
    (2) At least once every 6 weeks and for each shift, at least two 
miners on each coal producing working section who work on that section, 
accompanied by the section supervisor, shall participate in a practice 
escape drill and shall travel the primary or alternate escapeway from 
the location specified in paragraph (b)(1) of this section, to the 
surface, to mechanical escape facilities, or to an underground entrance 
to a shaft or slope to the surface. Systematic rotation of section 
personnel shall be used so that all miners participate in this drill. 
An escapeway drill shall not be conducted in the same escapeway as the 
immediately preceding drill.
    (3) At least once every 6 weeks, at least two miners on each 
maintenance shift and a supervisor, shall participate in a practice 
escape drill and shall travel the primary or alternate escapeway from 
the location specified in paragraph (b)(1) of this section, to the 
surface, to mechanical escape facilities, or to an underground entrance 
to a shaft or slope to the surface. Systematic rotation of maintenance 
personnel and working sections shall be used so that all miners 
participate in this drill and the escapeways from all sections are 
traveled. An escapeway drill shall not be conducted in the same 
escapeway as the immediately preceding drill.
    (4) Before or during practice escapeway drills, miners shall be 
informed of the locations of fire doors, check curtains, changes in the 
routes of travel, and plans for diverting smoke from escapeways.
    (c) The practice escapeway drills may be used to satisfy the 
evacuation specifications of the fire drills required by Sec. 75.1101-
23.

Sec. 75.384  Longwall and shortwall travelways.

    (a) If longwall or shortwall mining systems are used and the two 
designated escapeways required by Sec. 75.380 are located on the 
headgate side of the longwall or shortwall, a travelway shall be 
provided on the tailgate side of that longwall or shortwall. The 
travelway shall be located to follow the most direct and safe practical 
route to a designated escapeway.
    (b) The route of travel shall be clearly marked.
    (c) When a roof fall or other blockage occurs that prevents travel 
in the travelway--
    (1) Work shall cease on the longwall or shortwall face;
    (2) Miners shall be withdrawn from face areas to a safe area outby 
the section loading point; and
    (3) MSHA shall be notified.
    (d) Work may resume on the longwall or shortwall face after the 
procedures set out in Secs. 75.215 and 75.222 are implemented.

Sec. 75.385  Opening new mines.

    When new mines are opened, no more than 20 miners at a time shall 
be allowed in any mine until a connection has been made between the 
mine openings, and these connections shall be made as soon as possible.

Sec. 75.386  Final mining of pillars.

    When only one mine opening is available due to final mining of 
pillars, no more than 20 miners at a time shall be allowed in the mine, 
and the distance between the mine opening and working face shall not 
exceed 500 feet.

Sec. 75.388  Boreholes in advance of mining.

    (a) Boreholes shall be drilled in each advancing working place when 
the working place approaches--
    (1) To within 50 feet of any area located in the mine as shown by 
surveys that are certified by a registered engineer or registered 
surveyor unless the area has been preshift examined;
    (2) To within 200 feet of any area located in the mine not shown by 
surveys that are certified by a registered engineer or registered 
surveyor unless the area has been preshift examined; or
    (3) To within 200 feet of any mine workings of an adjacent mine 
located in 

[[Page 9846]]
the same coalbed unless the mine workings have been preshift examined.
    (b) Boreholes shall be drilled as follows:
    (1) Into the working face, parallel to the rib, and within 3 feet 
of each rib.
    (2) Into the working face, parallel to the rib, and at intervals 
across the face not to exceed 8 feet.
    (3) At least 20 feet in depth in advance of the working face, and 
always maintained to a distance of 10 feet in advance of the working 
face.
    (c) Boreholes shall be drilled in both ribs of advancing working 
places described in paragraph (a) of this section unless an alternative 
drilling plan is approved by the District Manager in accordance with 
paragraph (g) of this section. These boreholes shall be drilled--
    (1) At an angle of 45 degrees to the direction of advance;
    (2) At least 20 feet in depth; and
    (3) At intervals not to exceed 8 feet.
    (d) When a borehole penetrates an area that cannot be examined, and 
before mining continues, a certified person shall, if possible, 
determine--
    (1) The direction of airflow in the borehole;
    (2) The pressure differential between the penetrated area and the 
mine workings;
    (3) The concentrations of methane, oxygen, carbon monoxide, and 
carbon dioxide; and
    (4) Whether water is impounded within the penetrated area.
    (e) Unless action is taken to dewater or to ventilate penetrated 
areas, boreholes shall be plugged with wooden plugs or similar devices 
when--
    (1) Tests conducted at the boreholes show that the atmosphere in 
the penetrated area contains more than 1.0 percent methane, less than 
19.5 percent oxygen, or harmful concentrations of carbon monoxide, 
carbon dioxide or other explosive, harmful or noxious gases;
    (2) Tests for methane, oxygen, carbon monoxide, and carbon dioxide 
cannot be made because air from mine workings is flowing into the 
penetrated area; or
    (3) Water is discharging through the boreholes from the penetrated 
area into the mine workings.
    (f) If mining is to be conducted within 50 feet above or below an 
inaccessible area of another mine, boreholes shall be drilled, as 
necessary, according to a plan approved by the district manager.
    (g) Alternative borehole patterns that provide the same protection 
to miners as the pattern established by paragraphs (b) and (c) of this 
section may be used under a plan approved by the district manager.

Sec. 75.389  Mining into inaccessible areas.

    (a) (1) The operator shall develop and follow a plan for mining 
into areas penetrated by boreholes drilled under Sec. 75.388.
    (2) Mining shall not resume into any area penetrated by boreholes 
until conditions in the penetrated area can be determined under 
Sec. 75.388 and the plan for mining-through into the area has been 
approved by the district manager.
    (3) A copy of the procedures to be followed shall be posted near 
the site of the mining-through operations and the operator shall 
explain these procedures to all miners involved in the operations.
    (b) The procedures specified in the plan shall include--
    (1) The method of ventilation, ventilation controls, and the air 
quantities and velocities in the affected working section and working 
place;
    (2) Dewatering procedures to be used if a penetrated area contains 
a water accumulation; and
    (3) The procedures and precautions to be followed during mining-
through operations.
    (c) Except for routine mining-through operations that are part of a 
retreat section ventilation system approved in accordance with 
Sec. 75.371(f) and (x), the following provisions shall apply:
    (1) Before and during mining-through operations, a certified person 
shall perform air quality tests at intervals and at locations necessary 
to protect the safety of the miners.
    (2) During mining-through operations, only persons involved in 
these operations shall be permitted in the mine; and
    (3) After mining-through, a certified person shall determine that 
the affected areas are safe before any persons enter the underground 
areas of the mine.

[FR Doc. 96-5453 Filed 3-6-96; 11:23 am]
BILLING CODE 4510-43-P

Complete official Federal Register PDF

FR Doc. 96-5429 Radio Broadcasting Services; Barnesboro, Brookville, Indiana, Johnsonburg, Punxsutawney, PA
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Page 9648]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5429]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 73

[MM Docket No. 87-433; RM-5994 and RM-6181]

Radio Broadcasting Services; Barnesboro, Brookville, Indiana, 
Johnsonburg, Punxsutawney, PA

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Commission, at the request of Strattan Broadcasting, 
licensee of Station WMKX(FM), Channel 240A, Brookville, Pennsylvania, 
grants Strattan's rule making petition (RM-5994) seeking the upgrade of 
its Class A channel in Brookville on non-adjacent Channel 288B1. See 
Notice of Proposed Rule Making, 52 FR 39254 (October 21, 1987). The 
Commission dismisses the counterproposal (RM-6181) of Renda Radio, 
Inc., licensee of Station WPXZ-FM, Channel 288A, Punxsutawney, 
Pennsylvania. The Commission also allots Channel 277B1 as an 
alternative equivalent channel at Brookville, as requested by Strattan 
in its comments. To accommodate these allotments to Brookville, we also 
order four channel substitutions: Channel 281A in lieu of Channel 288A 
at Punxsutawney, Pennsylvania, and the modification of the 
authorization of Station WPXZ-FM accordingly; Channel 263A in lieu of 
Channel 277A at Johnsonburg, Pennsylvania; Channel 223A in lieu of 
Channel 276A at Indiana, Pennsylvania; and Channel 228A for Channel 
223A at Barnesboro, Pennsylvania. See Supplemental Information, infra.

DATES: Effective April 18, 1996. The window period for filing 
applications will open on April 18, 1996 and close on May 20, 1996.

FOR FURTHER INFORMATION CONTACT: J. Bertron Withers, Jr., Mass Media 
Bureau, (202) 418-2180.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Commission's 
Report and Order, MM Docket No. 87-433, adopted February 16, 1996 and 
released March 4, 1996. The full text of this Commission decision is 
available for inspection and copying during normal business hours in 
the Commission's Reference Center (Room 239), 1919 M Street, NW., 
Washington, DC 20554. The complete text of this decision may also be 
purchased from the Commission's copy contractor, International 
Transcription Services, 2100 M Street, NW., Suite 140, Washington, DC 
20037, (202) 857-3800.
    The Commission orders modification of the licenses of Station 
WMKX(FM), Brookville, to specify operation on Channel 288B1; of Station 
WPXZ-FM, Punxsutawney, to specify operation on Channel 281A; and of 
Station WQMU, Indiana, to specify operation on Channel 223A. Channel 
288B1 can be allotted to Brookville in compliance with the Commission's 
spacing requirements at coordinates North Latitude 41-09-36 and West 
Longitude 79-04-54. Channel 277B1 can also be allotted to Brookville in 
compliance with the Commission's spacing requirements at coordinates 
North Latitude 41-02-12 and West Longitude 79-06-06. Channel 263A can 
be allotted to Johnsonburg in compliance with the Commission's spacing 
requirements at either a site located at coordinates North Latitude 41-
29-24 and West Longtitude 78-40-36. With this action, the proceeding is 
terminated.

List of Subjects in 47 CFR Part 73

    Radio broadcasting.

    Part 73 of title 47 of the Code of Federal Regulations is amended 
as follows:

PART 73--[AMENDED]

    1. The authority citation for part 73 continues to read as follows:

    Authority: Secs 303, 48 Stat., as amended, 1082; 47 U.S.C. 154, 
303.

Sec. 73.202  [Amended]

    2. Section 73.202(b), the Table of FM Allotments under 
Pennsylvania, is amended by adding Channel 288B1 and Channel 277B1 and 
removing Channel 240A at Brookville; by adding Channel 281A and 
removing Channel 288A at Punxsutawney; by adding Channel 263A and 
removing Channel 277A at Johnsonburg; adding Channel 223A and removing 
Channel 276A at Indiana; and by adding Channel 228A and removing 
Channel 223A at Barnesboro.

Federal Communications Commission.
John A. Karousos,
Chief, Allocations Branch, Policy and Rules Division, Mass Media 
Bureau.
[FR Doc. 96-5429 Filed 3-8-96; 8:45 am]
BILLING CODE 6712-01-F

Complete official Federal Register PDF

FR Doc. 96-5369 Airworthiness Directives; Boeing Model 757 Series Airplanes Equipped with Pratt & Whitney Engines
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9599-9601]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5369]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 94-NM-72-AD; Amendment 39-9533; AD 96-05-07]

Airworthiness Directives; Boeing Model 757 Series Airplanes 
Equipped with Pratt & Whitney Engines

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment supersedes an existing airworthiness directive 
(AD), applicable to certain Boeing Model 757 series airplanes, that 
currently requires repetitive inspections to detect cracking in the 
midspar fuse pins and replacement of certain fuse pins. This amendment 
requires inspection of certain fuse pins, and replacement of certain 
fuse pins with certain other fuse pins. This amendment also requires 
inspections of refinished straight fuse pins and replacement of cracked 
refinished straight fuse pins with certain other straight fuse pins. 
This amendment is prompted by the development of new corrosion-
resistant steel fuse pins. The actions specified by this AD are 
intended to prevent cracking of the midspar fuse pins, which may lead 
to separation of the strut and engine from the wing of the airplane.

DATES: Effective April 10, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of April 10, 1996.

ADDRESSES: The service information referenced in this AD may be 
obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, 
Washington 98124-2207. This information may be examined at the Federal 
Aviation Administration (FAA), Transport Airplane Directorate, Rules 
Docket, 1601 Lind Avenue SW., Renton, Washington; or at the Office of 
the 

[[Page 9600]]
Federal Register, 800 North Capitol Street, NW., suite 700, Washington, 
DC.

FOR FURTHER INFORMATION CONTACT: Carrie Sumner, Aerospace Engineer, 
Airframe Branch, ANM-120S, FAA, Transport Airplane Directorate, Seattle 
Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, 
Washington 98055-4056; telephone (206) 227-2778; fax (206) 227-1181.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) by superseding AD 93-16-09, 
amendment 39-8666 (58 FR 45044, August 26, 1993), which is applicable 
to certain Boeing Model 757 series airplanes, was published as a 
supplemental notice of proposed rulemaking in the Federal Register on 
June 8, 1995 (60 FR 30208). The action proposed to require:
    1. Inspections to detect cracking of straight fuse pins,
    2. Replacement of cracked straight fuse pins with either new 15-5PH 
corrosion- resistant steel fuse pins or like pins,
    3. Replacement of bulkhead fuse pins with new 15-5PH corrosion-
resistant steel fuse pins, and
    4. Repetitive inspections of newly-installed fuse pins. 
(Installation of the new 15-5PH corrosion-resistant steel fuse pins 
would allow a longer repetitive inspection interval than was previously 
provided by AD 93-16-09.)
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received.
    All of the commenters support the proposed rule.
    One of the commenters, however, requests that the FAA consider 
revising this AD to include terminating action when Boeing finalizes 
its proposed pylon modification program. The commenter considers that 
that program, together with the replacement of the fuse pins, should 
constitute terminating action for the repetitive inspections that are 
required by this AD. The FAA acknowledges this comment, and may 
consider additional rulemaking once the manufacturer's pylon 
modification program has been developed, reviewed, and approved.
    After careful review of the available data, including the comments 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule as proposed.
    There are approximately 273 Model 757 series airplanes equipped 
with Pratt & Whitney engines of the affected design in the worldwide 
fleet. The FAA estimates that 237 airplanes of U.S. registry will be 
affected by this AD.
    The actions that are currently required by AD 93-16-09 take 
approximately 8 work hours per fuse pin; there are 4 fuse pins per 
airplane. The average labor rate is approximately $60 per work hour. 
Based on these figures, the cost impact of the actions currently 
required by AD 93-16-09 on U.S. operators is estimated to be $455,040, 
or $1,920 per airplane, per cycle. However, since the integrity and 
strength of the new steel fuse pins permit longer inspection intervals, 
the cost impact for these inspections will actually be lessened (since 
the inspections are not required to be performed as frequently as they 
were previously required under AD 93-16-09).
    The new actions that are required by this new AD will take 
approximately 56 work hours per fuse pin to accomplish, at an average 
labor rate of $60 per work hour (There are 4 fuse pins per airplane). 
Required parts will be provided by the manufacturer at no cost to the 
operator. Based on these figures, the cost impact on U.S. operators of 
the new requirements of this AD is estimated to be $3,185,280, or 
$13,440 per airplane.
    The cost impact figures discussed above are based on assumptions 
that no operator has yet accomplished any of the requirements of this 
AD action, and that no operator would accomplish those actions in the 
future if this AD were not adopted.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:
    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing amendment 39-8666 (58 FR 
45044, August 26, 1993), and by adding a new airworthiness directive 
(AD), amendment 39-9533, to read as follows:

96-05-07 Boeing: Amendment 39-9533. Docket 94-NM-72-AD. Supersedes 
AD 93-16-09, Amendment 39-8666.

    Applicability: Model 757 series airplanes equipped with Pratt & 
Whitney engines, certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
otherwise modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (f) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.
    Compliance: Required as indicated, unless accomplished 
previously.
    Note 2: Inspections accomplished prior to the effective date of 
this amendment in accordance with the procedures described in Boeing 
Service Bulletin 757-54A0019, Revision 4, dated May 27, 1993; 
Revision 3, dated March 26, 1992; or Revision 2, dated October 11, 
1989; are considered acceptable for compliance with the applicable 
inspection specified in this amendment.

    To prevent cracking of the midspar fuse pins, which may lead to 
separation of the strut and engine from the wing of the airplane, 
accomplish the following:
    (a) For airplanes equipped with straight fuse pins, part number 
(P/N) 311N5067-1: Prior to the accumulation of 3,800 total flight 
cycles on the straight fuse pin, perform an eddy current inspection 
to detect cracking in the straight fuse pins, in accordance with 
Boeing Service Bulletin 757-54A0019, Revision 5, dated March 17, 
1994.
    (1) If no cracking is detected, repeat the inspection thereafter 
at intervals not to 

[[Page 9601]]
exceed 1,000 flight cycles on the straight fuse pin.
    (2) If any cracking is detected, prior to further flight, 
accomplish the requirements of either paragraph (a)(2)(i) or 
(a)(2)(ii) of this AD.
    (i) Replace the cracked straight fuse pin with a new straight 
fuse pin, P/N 311N5067-1. Prior to the accumulation of 3,800 total 
flight cycles on that newly installed straight fuse pin, perform an 
eddy current inspection to detect cracking in that straight fuse 
pin, in accordance with the service bulletin. Repeat the inspection 
thereafter at intervals not to exceed 1,000 flight cycles on that 
newly installed straight fuse pin. Or
    (ii) Replace the cracked straight fuse pin with a new 15-5PH 
fuse pin, P/N 311N5217-1. Prior to the accumulation of 14,000 total 
flight cycles on that newly installed 15-5PH fuse pin, perform an 
eddy current inspection to detect cracking in that newly installed 
15-5PH fuse pin, in accordance with the procedures described in the 
service bulletin. Repeat the inspection thereafter at intervals not 
to exceed 3,500 flight cycles on that newly installed 15-5PH fuse 
pin.
    (b) For airplanes equipped with refinished straight fuse pins, 
P/N 311N5067-1: Prior to the accumulation of 1,000 total flight 
cycles on the refinished straight fuse pin, perform an eddy current 
inspection to detect cracking in the refinished straight fuse pins, 
in accordance with Boeing Service Bulletin 757-54A0019, Revision 5, 
dated March 17, 1994.
    (1) If no cracking is detected, repeat the inspection thereafter 
at intervals not to exceed 1,000 flight cycles on the refinished 
straight fuse pin.
    (2) If any cracking is detected, prior to further flight, 
accomplish the requirements of either paragraph (b)(2)(i), 
(b)(2)(ii), or (b)(2)(iii) of this AD, in accordance with the 
service bulletin.
    (i) Replace the cracked refinished straight fuse pin with a 
crack-free refinished straight fuse pin, P/N 311N5067-1. Prior to 
the accumulation of 1,000 total flight cycles on that newly 
installed refinished straight fuse pin, perform an eddy current 
inspection to detect cracking in that newly installed refinished 
straight fuse pin, in accordance with the procedures described in 
the service bulletin. Repeat this inspection thereafter at intervals 
not to exceed 1,000 flight cycles on the newly installed refinished 
straight fuse pin. Or
    (ii) Replace the cracked refinished straight fuse pin with a new 
straight fuse pin, P/N 311N5067-1. Prior to the accumulation of 
3,800 total flight cycles on that newly installed straight fuse pin, 
perform an eddy current inspection to detect cracking in that newly 
installed straight fuse pin, in accordance with the service 
bulletin. Repeat the inspection thereafter at intervals not to 
exceed 1,000 flight cycles on that newly installed straight fuse 
pin. Or
    (iii) Replace the cracked refinished straight fuse pin with a 
new 15-5PH fuse pin, P/N 311N5217-1. Prior to the accumulation of 
14,000 total flight cycles on that newly installed 15-5PH fuse pin, 
perform an eddy current inspection to detect cracking in that newly 
installed 15-5PH pin, in accordance with the procedures described in 
the service bulletin. Repeat the inspection thereafter at intervals 
not to exceed 3,500 flight cycles on that newly installed 15-5PH 
fuse pin.
    (c) For airplanes equipped with bulkhead fuse pins, P/N 
311N5211-1: Within 3,000 flight cycles after the effective date of 
this AD, replace the bulkhead fuse pins with 15-5PH fuse pins, P/N 
311N5217-1, in accordance with Boeing Service Bulletin 757-54A0019, 
Revision 5, dated March 17, 1994, and accomplish the requirements of 
paragraph (d) of this AD.
    (d) For airplanes equipped with 15-5PH fuse pins: Prior to the 
accumulation of 14,000 total flight cycles on the 15-5PH fuse pins, 
perform an eddy current inspection to detect cracking in those 15-
5PH fuse pins, in accordance with the procedures described in Boeing 
Service Bulletin 757-54A0019, Revision 5, dated March 17, 1994.
    (1) If no cracking is detected, repeat the inspection thereafter 
at intervals not to exceed 3,500 flight cycles on the 15-5PH fuse 
pin.
    (2) If any cracking is detected, accomplish the requirements of 
both paragraphs (d)(2)(i) and (d)(2)(ii) of this AD.
    (i) Prior to further flight, replace any cracked 15-5PH fuse pin 
with a new 15-5PH fuse pin, P/N 311N5217-1, in accordance with the 
procedures described in the service bulletin. And
    (ii) Prior to the accumulation of 14,000 total flight cycles on 
that newly installed 15-5PH fuse pin, perform an eddy current 
inspection to detect cracking in that newly installed 15-5PH fuse 
pin, in accordance with the procedures described in the service 
bulletin. Repeat the inspection thereafter at intervals not to 
exceed 3,500 flight cycles on that newly installed 15-5PH fuse pin.
    (e) Fuse pins must be of the same type on the same strut. For 
example, a steel fuse pin having P/N 311N5067-1 may not be installed 
on the same strut that has a corrosion-resistant steel (CRES) fuse 
pin having P/N 311N5217-1 installed on that strut. However, fuse 
pins on one strut may differ from those on another strut, provided 
the fuse pins are not of mixed types on the same strut.
    (f) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Seattle Aircraft Certification 
Office (ACO), FAA, Transport Airplane Directorate. Operators shall 
submit their requests through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Seattle ACO.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Seattle ACO.

    (g) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (h) The inspections and replacements shall be done in accordance 
with Boeing Service Bulletin 757-54A0019, Revision 5, dated March 
17, 1994. This incorporation by reference was approved by the 
Director of the Federal Register in accordance with 5 U.S.C. 552(a) 
and 1 CFR part 51. Copies may be obtained from Boeing Commercial 
Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. 
Copies may be inspected at the FAA, Transport Airplane Directorate, 
1601 Lind Avenue, SW., Renton, Washington; or at the Office of the 
Federal Register, 800 North Capitol Street, NW., suite 700, 
Washington, DC.
    (i) This amendment becomes effective on April 10, 1996.

    Issued in Renton, Washington, on March 1, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-5369 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-5367 Airworthiness Directives; Boeing Model 757 Series Airplanes Equipped With Rolls Royce Engines
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9601-9604]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5367]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 94-NM-71-AD; Amendment 39-9534; AD 96-05-08]

Airworthiness Directives; Boeing Model 757 Series Airplanes 
Equipped With Rolls Royce Engines

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment supersedes an existing airworthiness directive 
(AD), applicable to certain Boeing Model 757 series airplanes, that 
currently requires repetitive inspections to detect cracking in the 
midspar fuse pins and replacement of certain fuse pins. This amendment 
adds requirements to inspect straight fuse pins and replace any cracked 
straight fuse pins with either new corrosion-resistant steel fuse pins 
or like pins; replace bulkhead fuse pins with new corrosion-resistant 
steel fuse pins; and repetitively inspect newly installed fuse pins. 
This amendment is prompted by the development of new corrosion-
resistant steel fuse pins. The actions specified by this AD are 
intended to prevent cracking of the midspar fuse pins, which may lead 
to separation of the strut and engine from the wing of the airplane.

DATES: Effective April 10, 1996.
    The incorporation by reference of certain publications listed in 
the regulations is approved by the Director of the Federal Register as 
of April 10, 1996.

ADDRESSES: The service information referenced in this AD may be 
obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle,

[[Page 9602]]

Washington 98124-2207. This information may be examined at the Federal 
Aviation Administration (FAA), Transport Airplane Directorate, Rules 
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of 
the Federal Register, 800 North Capitol Street, NW., suite 700, 
Washington, DC.

FOR FURTHER INFORMATION CONTACT: Carrie Sumner, Aerospace Engineer, 
Airframe Branch, ANM-120S, FAA, Transport Airplane Directorate, Seattle 
Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, 
Washington 98055-4056; telephone (206) 227-2778; fax (206) 227-1181.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) by superseding AD 93-16-08, 
amendment 39-8665 (58 FR 45041, August 26, 1993), which is applicable 
to certain Boeing Model 757 series airplanes, was published as a 
supplemental notice of proposed rulemaking in the Federal Register on 
May 18, 1995 (60 FR 26697). That action proposed to add a requirement 
to inspect straight fuse pins and replace any cracked straight fuse 
pins with either new corrosion-resistant steel fuse pins or like pins; 
replace bulkhead fuse pins with new corrosion-resistant steel fuse 
pins; and repetitively inspect newly installed fuse pins.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received.
    One commenter, an affected operator, requests that the 
applicability of the proposed rule be revised to exclude any new 
airplanes that are delivered with the new, improved fuse pins already 
installed. This commenter presents two reasons for this request:
    1. The commenter recently received airplanes that were already 
equipped with the new (15-5PH) mid spar fuse pins. These particular 
airplanes are not included in the effectivity listing of the Boeing 
service bulletin that was referenced in the proposed rule. Since 
applicability of the proposed rule would include all Model 757's 
equipped with Rolls Royce engines, the commenter's airplanes would be 
subject to the requirements of the AD, even though these airplanes were 
not listed in the referenced service bulletin.
    2. New airplanes delivered with the new fuse pins will be 
inspected, and any replacement of fuse pins can be made, under the 
regular maintenance program.
    The FAA does not concur with the commenter's request.
    As for Item 1, the applicability of an AD takes precedence over the 
effectivity listing of a service bulletin. Further, the inspection and 
replacement procedures outlined in the referenced Boeing service 
bulletin can be accomplished on any Model 757, and are not specifically 
tailored only to airplanes specified in the effectivity listing of the 
service bulletin.
    As for Item 2, the FAA is not aware of any current maintenance 
program requirement that includes the inspection and replacement of 15-
5PH fuse pins at the intervals set forth in this AD. The FAA 
established the intervals based on the manufacturer's analysis and 
testing, which demonstrated that the 15-5PH fuse pin has a fatigue 
threshold of 14,000 flight cycles. This identified threshold is 
applicable to all 15-5PH fuse pins, regardless of whether or not the 
airplane on which they are installed is listed in the referenced Boeing 
service bulletin. If the fuse pins are not replaced or inspected at the 
times required by this AD, the safety concerns associated with fracture 
of the fuse pins will still exist. The FAA considers issuance of this 
AD to be necessary, since AD's are the means by which the 
accomplishment of procedures and adherence to specific necessary 
compliance times are made mandatory.
    This same commenter contends that the manufacturer should revise 
the referenced Boeing service bulletin to include procedures for eddy 
current inspections of the 15-5PH fuse pins, as well as instructions 
for removal and replacement of those pins. The revised service bulletin 
should also include a listing of all applicable airplanes. The 
commenter requests that the proposed rule be changed to reference the 
revised service bulletin.
    The FAA does not concur that a change to the rule is necessary. As 
for the procedures for inspections, the referenced Boeing service 
bulletin specifies that they can be found in the 757 Nondestructive 
Test (NDT) Manual, Part 6, Subject 54-40-01, Figure 1 (this is noted on 
page 16 of the Boeing service bulletin). As for removal and replacement 
procedures, Figure 4 of the referenced Boeing service bulletin displays 
a detail of the 15-5PH fuse pin installation that can be used in 
accomplishing those actions. As for the listing of applicable 
airplanes, while it may be convenient for operators to have all 
affected airplanes listed in the service bulletin, the FAA reiterates 
that the applicability statement of an AD takes precedence over the 
effectivity listing of any service bulletin. The FAA does intend to 
recommend to Boeing that, whenever it plans to revise Service Bulletin 
757-54A0020, the procedures for inspection, removal, and replacement of 
the 15-5PH fuse pins be included.
    One commenter requests that paragraph (a)(2)(ii) of the proposal be 
revised to indicate that installation of the new 15-5PH fuse pins 
constitutes terminating action for the inspections of the older style 
fuse pins. This commenter asserts that the new pins have not yet been 
shown to be unsafe in-service. Further, once the new 15-5PH pins are 
installed, they can be regularly inspected under the operator's FAA-
approved maintenance program.
    The FAA does not concur. As indicated earlier, the manufacturer has 
demonstrated, by analysis supported by tests, that the 15-5PH fuse pin 
has a fatigue threshold of 14,000 flight cycles. In fact, in Revision 5 
of Boeing Service Bulletin 757-54A0020, which was referenced in the 
proposed AD, the manufacturer recommends that all 15-5PH fuse pins be 
replaced with new pins after 14,000 flight cycles. As an option, at 
14,000 flight cycles, the 15-5PH fuse pins may be examined for cracks 
and, if no cracking is evident, they may be continually reexamined at 
3,500 flight cycle intervals. The FAA has determined that this 
inspection schedule is both appropriate and warranted to address the 
unsafe condition that arises from the consequences of fractured fuse 
pins. Also, as indicated earlier, the FAA is not aware of any current 
maintenance program requirement that includes the inspection and 
replacement of 15-5PH fuse pins at the intervals set forth in this AD. 
The FAA finds that the issuance of this AD is necessary in order to 
ensure that the accomplishment of the procedures and the adherence to 
specific compliance times are achieved.
    After careful review of the available data, including the comments 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule as proposed.
    There are approximately 306 Model 757 series airplanes equipped 
with Rolls Royce engines of the affected design in the worldwide fleet. 
The FAA estimates that 119 airplanes of U.S. registry will be affected 
by this proposed AD.
    The inspections that were previously required by AD 93-16-08, and 
retained in this new AD, take approximately 8 work hours per fuse pin; 
there are 4 fuse pins per airplane. The average labor rate is 
approximately $60 per work hour. Based on these figures, the current 
cost impact of these inspections on U.S. operators is estimated to be 
$228,480, or $1,920 per airplane, per inspection 

[[Page 9603]]
cycle. However, since the integrity and strength of the new steel fuse 
pins permit longer inspection intervals, the cost impact of these 
inspections will be lessened, since the inspections are not required to 
be performed as frequently as they were previously required under AD 
93-16-08.
    The replacement that is required by this new AD will take 
approximately 56 work hours per fuse pin, at an average labor rate of 
$60 per work hour. Required parts will be provided by the manufacturer 
at no cost to the operator. Based on these figures, the cost impact of 
the replacement action on U.S. operators is estimated to be $1,599,360, 
or $13,440 per airplane.
    The cost impact figures discussed above are based on assumptions 
that no operator has yet accomplished any of the proposed requirements 
of this AD action, and that no operator would accomplish those actions 
in the future if this AD were not adopted.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing amendment 39-8665 (58 FR 
45041, August 26, 1993), and by adding a new airworthiness directive 
(AD), amendment 39-9534, to read as follows:

96-05-08 Boeing: Amendment 39-9534. Docket 94-NM-71-AD. Supersedes 
AD 93-16-08, Amendment 39-8665.

    Applicability: Model 757 series airplanes equipped with Rolls 
Royce engines, certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (f) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.

    Note 2: Inspections accomplished prior to the effective date of 
this amendment in accordance with the procedures described in Boeing 
Service Bulletin 757-54A0020, Revision 4, dated May 27, 1993; 
Revision 3, dated March 26, 1992; or Revision 2, dated October 31, 
1991; are considered acceptable for compliance with the applicable 
inspection specified in this amendment.

    To prevent cracking of the midspar fuse pins, which may lead to 
separation of the strut and engine from the wing of the airplane, 
accomplish the following:
    (a) For airplanes equipped with straight fuse pins, part number 
(P/N) 311N5067-1: Prior to the accumulation of 5,000 total flight 
cycles on the straight fuse pin, perform an eddy current inspection 
to detect cracking in those fuse pins, in accordance with Boeing 
Service Bulletin 757-54A0020, Revision 5, dated March 17, 1994.
    (1) If no cracking is detected, repeat the inspection thereafter 
at intervals not to exceed 1,500 flight cycles on the straight fuse 
pin.
    (2) If any cracking is detected, prior to further flight, 
accomplish the requirements of either paragraph (a)(2)(i) or 
(a)(2)(ii) of this AD.
    (i) Replace the cracked straight fuse pin with a new straight 
fuse pin, P/N 311N5067-1, and prior to the accumulation of 5,000 
total flight cycles on the newly installed straight fuse pin, 
perform an eddy current inspection, in accordance with the service 
bulletin. Repeat the inspection thereafter at intervals not to 
exceed 1,500 flight cycles on the newly installed straight fuse pin. 
Or
    (ii) Replace the cracked straight fuse pin with a new 15-5PH 
fuse pin, P/N 311N5217-1, and prior to the accumulation of 14,000 
total flight cycles on the newly installed 15-5PH fuse pin, perform 
an eddy current inspection to detect cracking in the newly installed 
pin, in accordance with the procedures described in the service 
bulletin. Repeat the inspection thereafter at intervals not to 
exceed 3,500 flight cycles on the newly installed fuse pin.
    (b) For airplanes equipped with refinished straight fuse pins, 
P/N 311N5067-1: Perform an eddy current inspection to detect 
cracking in those fuse pins at intervals not to exceed 1,500 flight 
cycles on the refinished fuse pins, in accordance with Boeing 
Service Bulletin 757-54A0020, Revision 5, dated March 17, 1994.
    (1) If no cracking is detected, repeat the inspection thereafter 
at intervals not to exceed 1,500 flight cycles on the refinished 
straight fuse pin.
    (2) If any cracking is detected, prior to further flight, 
accomplish the requirements of either paragraph (b)(2)(i), 
(b)(2)(ii), or (b)(2)(iii) of this AD, in accordance with the 
service bulletin.
    (i) Replace the cracked refinished straight fuse pin with a 
crack-free refinished straight fuse pin, P/N 311N5067-1, and perform 
an eddy current inspection to detect cracking in the refinished 
straight fuse pin at intervals not to exceed 1,500 flight cycles, in 
accordance with the procedures described in the service bulletin. Or
    (ii) Replace the cracked refinished straight fuse pin with a new 
straight fuse pin, P/N 311N5067-1, and prior to the accumulation of 
5,000 total flight cycles on the newly installed straight fuse pin, 
perform an eddy current inspection, in accordance with the service 
bulletin. Repeat the inspection thereafter at intervals not to 
exceed 1,500 flight cycles on the newly installed straight fuse pin. 
Or
    (iii) Replace the cracked refinished straight fuse pin with a 
new 15-5PH fuse pin, P/N 311N5217-1, and prior to the accumulation 
of 14,000 total flight cycles on the newly installed 15-5PH fuse 
pin, perform an eddy current inspection to detect cracking in the 
newly installed pin, in accordance with the procedures described in 
the service bulletin. Repeat the inspection thereafter at intervals 
not to exceed 3,500 flight cycles on the newly installed fuse pin.
    (c) For airplanes equipped with bulkhead fuse pins, P/N 
311N5211-1: Within 3,000 flight cycles after the effective date of 
this AD, replace the bulkhead fuse pins with 15-5PH fuse pins, P/N 
311N5217-1, in accordance with Boeing Service Bulletin 757-54A0020, 
Revision 5, dated March 17, 1994, and accomplish the requirements of 
paragraph (d) of this AD.
    (d) For airplanes equipped with 15-5PH fuse pins: Prior to the 
accumulation of 14,000 total flight cycles on the 15-5PH fuse pins, 
perform an eddy current inspection to detect cracking in those fuse 
pins, in accordance with the procedures described in Boeing Service 
Bulletin 757-54A0020, Revision 5, dated March 17, 1994. 

[[Page 9604]]

    (1) If no cracking is detected, repeat the inspection thereafter 
at intervals not to exceed 3,500 flight cycles on the fuse pin.
    (2) If any cracking is detected, accomplish the requirements of 
paragraphs (d)(2)(i) and (d)(2)(ii) of this AD.
    (i) Prior to further flight, replace any cracked 15-5PH fuse pin 
with a new 15-5PH fuse pin, P/N 311N5217-1, in accordance with the 
procedures described in the service bulletin. And
    (ii) Prior to the accumulation of 14,000 total flight cycles on 
the newly installed 15-5PH fuse pin, perform an eddy current 
inspection to detect cracking in the newly installed pin, in 
accordance with the procedures described in the service bulletin. 
Repeat the inspection thereafter at intervals not to exceed 3,500 
flight cycles on the newly installed fuse pin.
    (e) Fuse pins must be of the same type on the same strut. For 
example, a steel fuse pin having P/N 311N5067-1 may not be installed 
on the same strut that has a corrosion-resistant steel (CRES) fuse 
pin having P/N 311N5217-1 installed on that strut. However, fuse 
pins on one strut may differ from those on another strut, provided 
the fuse pins are not of mixed types on the same strut.
    (f) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Seattle Aircraft Certification 
Office (ACO), FAA, Transport Airplane Directorate. Operators shall 
submit their requests through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Seattle ACO.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Seattle ACO.

    (g) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (h) The actions shall be done in accordance with Boeing Service 
Bulletin 757-54A0020, Revision 5, dated March 17, 1994. This 
incorporation by reference was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Copies may be obtained from Boeing Commercial Airplane Group, 
P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be 
inspected at the FAA, Transport Airplane Directorate, 1601 Lind 
Avenue, SW., Renton, Washington; or at the Office of the Federal 
Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
    (i) This amendment becomes effective on April 10, 1996.

    Issued in Renton, Washington, on March 1, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-5367 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-5366 Airworthiness Directives; Airbus Model A300, A300-600, A310, A330, and A340 Series Airplanes
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9604-9606]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5366]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-156-AD; Amendment 39-9535; AD 96-05-09]

Airworthiness Directives; Airbus Model A300, A300-600, A310, 
A330, and A340 Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This amendment supersedes an existing airworthiness directive 
(AD), that is applicable to all Airbus Model A300, A300-600, A310, 
A330, and A340 series airplanes. The existing AD currently requires an 
inspection of the sliding side windows in the cockpit to identify 
suspect windows; and either deactivation of the sliding window 
defogging system; installation of thermo-sensitive indicators; or 
replacement of the window. This amendment adds a requirement to replace 
suspect windows with serviceable windows, which, when accomplished, 
terminates the requirements of the AD. The actions specified by this 
amendment are intended to prevent rupture of a cockpit sliding window 
and subsequent rapid decompression of the fuselage due to fracture of 
the window as a result of thermal stress created by overheating of the 
wires of the heating element in a localized area.

DATES: Effective April 10, 1996.
    The incorporation by reference of Airbus All Operators Telex 30-01, 
Revision 2, dated listed in the regulations is approved by the Director 
of the Federal Register as of April 10, 1996.
    The incorporation by reference of Airbus All Operators Telex 30-01, 
dated December 22, 1994, listed in the regulations, was approved 
previously by the Director of the Federal Register as of February 14, 
1994 (60 FR 5564, January 30, 1995).

ADDRESSES: The service information referenced in this AD may be 
obtained from Airbus Industrie, 1 Rond Point Maurice Beilonte, 31707 
Blagnac Cedex, France. This information may be examined at the Federal 
Aviation Administration (FAA), Transport Airplane Directorate, Rules 
Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of 
the Federal Register, 800 North Capitol Street, NW., suite 700, 
Washington, DC.

FOR FURTHER INFORMATION CONTACT: Charles Huber, Aerospace Engineer, 
Standardization Branch, ANM-113, FAA, Transport Airplane Directorate, 
1601 Lind Avenue SW., Renton, Washington 98055-4056; telephone (206) 
227-2146; fax (206) 227-1149.

SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal 
Aviation Regulations (14 CFR part 39) by superseding, amendment 39-9125 
(60 FR 5564, January 30, 1995), which is applicable to all Airbus Model 
A300, A300-600, A310, A330, and A340 series airplanes, was published as 
a Notice of Proposed Rulemaking (NPRM) in the Federal Register on 
October 26, 1995 (60 FR 54820). That NPRM proposed to continue to 
require certain actions previously required by AD 95-01-51, 
specifically:
    1. the inspection of the sliding side windows in the cockpit to 
identify the part number of the windows; and
    2. if suspect windows are installed, either deactivation of the 
sliding window defogging system; or installation of thermo-sensitive 
indicators, daily inspections of those indicators, and deactivation of 
the defogging system, if necessary; or replacement of the window.
    The NPRM also proposed to require the eventual replacement of 
suspect windows with serviceable windows. This replacement of the 
windows would constitute terminating action for the requirements of the 
AD.
    Interested persons have been afforded an opportunity to participate 
in the making of this amendment. Due consideration has been given to 
the comments received.
    One commenter supports the proposal.
    The Air Transport Association (ATA) of America, on behalf of its 
two member operators that are subject to this AD, requests that the FAA 
withdraw the proposal. This commenter indicates that these two U.S. 
operators have already replaced the subject cockpit sliding windows 
with approved alternative parts on all of their affected airplanes. 
Additionally, the commenter states that the part numbered windows that 
prompted the airworthiness concern are no longer manufactured or 
available for purchase. For these reasons, this commenter contends that 
the proposed rule is not warranted.
    The FAA does not concur with the commenter's request. The FAA has 
received no documentation verifying that all affected U.S.-registered 
airplanes have been modified in accordance with the actions required by 
this rule. Regardless of whether or not all current U.S.-registered 
airplanes have been modified, the FAA has received no data or other 
evidence to verify that all affected airplanes, worldwide, have been 
modified. Without this AD, an 

[[Page 9605]]
unmodified airplane potentially could be imported and placed on the 
U.S. Register in the future, thereby reintroducing the unsafe condition 
into the U.S. fleet. It is the responsibility of the FAA, and the 
intent of this AD, to ensure that this does not happen. Therefore, the 
issuance of this AD is both warranted and necessary.
    After careful review of the available data, including the comments 
noted above, the FAA has determined that air safety and the public 
interest require the adoption of the rule as proposed.
    There are approximately 66 Model A300, A300-600, and A310 series 
airplanes of U.S. registry that will be affected by this AD. 
(Currently, there are no Model A330 or A340 series airplanes on the 
U.S. Register.)
    The actions that are currently required by AD 95-01-51 take 
approximately 1 work hour per airplane to accomplish, at an average 
labor rate of $60 per work hour. Based on these figures, the cost 
impact on U.S. operators of the actions currently required is estimated 
to be $3,960, or $60 per airplane.
    The replacement of the windows will take approximately 7 work hours 
per airplane to accomplish, at an average labor rate of $60 per work 
hour. Required parts will be provided by the manufacturer at no cost to 
operators. Based on these figures, the total cost impact on U.S. 
operators of the new requirements of this AD is estimated to be 
$27,720, or $420 per airplane.
    The cost impact figures discussed above are based on assumptions 
that no operator has yet accomplished any of the requirements of this 
AD action, and that no operator would accomplish those actions in the 
future if this AD were not adopted. However, the FAA has been advised 
that two U.S. operators have already replaced the subject windows in 
accordance with the requirements of this AD. Therefore, the future cost 
impact of this AD on U.S. operators is expected to be less that the 
figure indicated above.
    The regulations adopted herein will not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this final 
rule does not have sufficient federalism implications to warrant the 
preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this action (1) is 
not a ``significant regulatory action'' under Executive Order 12866; 
(2) is not a ``significant rule'' under DOT Regulatory Policies and 
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. A final evaluation has been prepared for this action 
and it is contained in the Rules Docket. A copy of it may be obtained 
from the Rules Docket at the location provided under the caption 
ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration amends part 39 of 
the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by removing amendment 39-9125 (60 FR 
5564, January 30, 1995), and by adding a new airworthiness directive 
(AD), amendment 39-9535, to read as follows:

96-05-09  Airbus Industrie: Amendment 39-9535. Docket 95-NM-156-AD. 
Supersedes AD 95-01-51, Amendment 39-9125.

    Applicability: All Model A300, A300-600, A310, A330, and A340 
series airplanes, certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (e) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent rupture of a cockpit sliding window and subsequent 
rapid decompression of the fuselage due to fracture of the window as 
a result of thermal stress created by overheating of the wires of 
the heating element in a localized area, accomplish the following:
    (a) Within 7 days after February 14, 1995 (the effective date of 
AD 95-01-51, amendment 39-9125), perform an inspection of the left- 
and right-hand sliding side windows in the cockpit to identify the 
part number (P/N) of those windows, in accordance with paragraph 4.1 
of Airbus All Operators Telex (AOT) 30-01, dated December 22, 1994; 
or Revision 2, dated March 6, 1995.
    (b) If no window manufactured by PPG Industries having P/N 
NP175202-1 (left-hand side) or NP175202-2 (right-hand side) is 
installed, no further action is required by this AD.
    (c) If any window manufactured by PPG Industries having P/N NP 
175202-1 (left-hand side) or NP 175202-2 (right-hand side) is 
installed, prior to further flight, accomplish either paragraph 
(c)(1), (c)(2), or (c)(3) of this AD in accordance with Airbus AOT 
30-01, dated December 22, 1994; or Revision 2, dated March 6, 1995.
    (1) Deactivate the associated sliding window defogging system in 
accordance with the procedures specified in paragraph 4.2.2 of the 
AOT. The defogging system may remain deactivated until the window is 
replaced in accordance with paragraph (d) of this AD. Or

    Note 2: This AD may permit the defogging system to be 
deactivated for a longer time than is specified in the Master 
Minimum Equipment List (MMEL). In any case, the provisions of this 
AD prevail.

    (2) Install thermo-sensitive indicators in two areas of the 
sliding side window (left- and right-hand sides) in accordance with 
the procedures specified in paragraph 4.3 of the AOT. Thereafter, 
perform a daily inspection of the indicators to determine if the 60-
degree segment of any indicator turns from light grey to black, in 
accordance with the procedures specified in paragraph 4.3 of the 
AOT. If any indicator turns black, prior to further flight, 
deactivate the associated sliding window defogging system in 
accordance with paragraph (c)(1) of this AD.
    (3) Replace the PPG Industries window [having part number (P/N) 
NP 175202-1 (left-hand side) or NP 175202-2 (right-hand side)] with 
a serviceable window manufactured by PPG Industries or by SPS, as 
listed in paragraph 5.1 of the AOT, in accordance with the 
procedures specified in paragraph 5.1 of the AOT. After such 
replacement, no further action is required by this AD.
    (d) Within 90 days after the effective date of this AD, replace 
any PPG Industries window having part number (P/N) NP 175202-1 
(left-hand side) or NP 175202-2 (right-hand side) with a serviceable 
window manufactured by PPG Industries or by SPS, as listed in 
paragraph 5.1 of AOT 30-01, dated December 22, 1994; or paragraphs 
5.2.1 (PPG Industries windows) and 5.2.2 (SPS windows) of AOT 30-01, 
Revision 2, dated March 6, 1995. Accomplish the replacement in 
accordance with the procedures specified in AOT 30-01, dated 
December 22, 1994, or Revision 2, dated March 6, 1995. After such 
replacement, no further action is required by this AD.
    (e) An alternative method of compliance or adjustment of the 
compliance time that 

[[Page 9606]]
provides an acceptable level of safety may be used if approved by 
the Manager, Standardization Branch, ANM-113, FAA, Transport 
Airplane Directorate. Operators shall submit their requests through 
an appropriate FAA Principal Maintenance Inspector, who may add 
comments and then send it to the Manager, Standardization Branch, 
ANM-113.

    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Standardization Branch, ANM-113.

    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.
    (g) The actions shall be done in accordance with Airbus All 
Operators Telex 30-01, dated December 22, 1994; or Airbus All 
Operators Telex 30-01, Revision 2, dated March 6, 1995. The 
incorporation by reference of Airbus All Operators Telex 30-01, 
dated December 22, 1994, was approved previously by the Director of 
the Federal Register, in accordance with 5 U.S.C. 552(a) and 1 CFR 
part 51, as of February 14, 1995 (60 FR 5564, January 30, 1995). The 
incorporation by reference of Airbus All Operators Telex 30-01, 
Revision 2, dated March 6, 1995, was approved by the Director of the 
Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR 51. 
Copies may be obtained from Airbus Industrie, 1 Rond Point Maurice 
Bellonte, 31707 Blagnac Cedex, France. Copies may be inspected at 
the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., 
Renton, Washington; or at the Office of the Federal Register, 800 
North Capitol Street, NW., suite 700, Washington, DC.
    (h) This amendment becomes effective on April 10, 1996.

    Issued in Renton, Washington, on March 1, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-5366 Filed 3-8-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-5254 Contractor Conflicts of Interest
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9590-9599]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5254]

=======================================================================
-----------------------------------------------------------------------

FEDERAL DEPOSIT INSURANCE CORPORATION

12 CFR Part 366

RIN 3064-AB39

Contractor Conflicts of Interest

AGENCY: Federal Deposit Insurance Corporation.

ACTION: Interim final rule.

-----------------------------------------------------------------------

SUMMARY: The Board of Directors of the Federal Deposit Insurance 
Corporation (FDIC or Corporation), with the concurrence of the Office 
of Government Ethics (OGE), is adopting an interim final rule 
implementing certain provisions of section 19 of the Resolution Trust 
Corporation Completion Act (the Completion Act) and soliciting 
comments. Section 19 of the Completion Act amended section 12 of the 
Federal Deposit Insurance Act (FDI Act) and requires the Board of 
Directors to prescribe regulations to ensure that contractors meet 
minimum standards of competence, experience, integrity and fitness, and 
requires that these regulations establish prohibitions on the 
Corporation's ability to contract with or have certain entities provide 
services to the FDIC. Section 19 of the Completion Act also requires 
that the Board of Directors prescribe regulations governing conflicts 
of interest, ethical responsibilities, and the use of confidential 
information for those independent contractors who are not deemed under 
the FDI Act, as amended, to be employees of the Corporation for 
purposes of Title 18 of the United States Code. Pursuant to the 
authority granted to it under the Completion Act, the Board of 
Directors is making the regulations required under section 19 of the 
Completion Act applicable to any FDIC contracts for services and has 
combined the required regulations in the interim final rule.
    The Board determined that combining the prescribed regulations into 
one rule would provide the most consistent treatment of contractors and 
reduce confusion in the application of the regulations.

DATES: Effective date. April 10, 1996.
    Comment period date. Comments must be received on or before May 10, 
1996.

ADDRESSES: Send comments to Jerry L. Langley, Executive Secretary, 
FDIC, 550 17th Street, NW, Washington, DC 20429. Comments may be hand-
delivered to room 400, 1776 F Street, NW, Washington, DC 20429 on 
business days between 8:30 a.m. and 5:00 p.m. [FAX number: (202) 898-
3604; Internet: [email protected]]. Comments will be available for 
inspection and photocopying at the FDIC's Reading Room, room 7118, 550 
17th Street, NW, Washington, DC 20429, between 9:00 a.m. and 4:30 p.m. 
on business days.

FOR FURTHER INFORMATION CONTACT: James T. Lantelme, Assistant General 
Counsel, Regional Affairs Section, Legal Division, (202) 736-0120; or 
Richard M. Handy, Ethics Program Manager, Office of the Executive 
Secretary, (202) 898-7271, both at the FDIC.

SUPPLEMENTARY INFORMATION:

I. Background

    On June 24, 1994, the Corporation published for comment a proposed 
rule applicable to independent contractors designed to establish 
standards governing conflicts of interest, ethical responsibilities, 
and the use of confidential information and procedures for ensuring 
that independent contractors meet minimum standards of competence, 
experience, integrity, and fitness (59 FR 32661-32668). The proposed 
rule was published in response to the requirements of Section 19(a) of 
the Resolution Trust Corporation Completion Act, codified at 12 U.S.C. 
1822(f), which requires that the Board of Directors prescribe 
regulations establishing procedures for ensuring that any individual 
who is performing any function or service on behalf of the Corporation 
meets minimum standards of competence, experience, integrity, and 
fitness and prohibiting any person who does not meet such standards 
from entering into contracts for services with or performing services 
on behalf of the Corporation. The Completion Act also requires the 
Board of Directors, with the concurrence of OGE, to prescribe 
regulations governing conflicts of interest, ethical responsibilities, 
and the use of confidential information. The proposed rule prescribed a 
60-day comment period and invited comments from all interested parties. 
The Corporation received six comment letters and, after careful 
consideration of each comment, has made appropriate modifications to 
the rule. In addition, OGE requested numerous changes which resulted in 
the reorganization and modification of some provisions. The Board 
determined that an interim final rule would be appropriate in order to 
allow interested parties to comment on the revised rule while providing 
for the prompt implementation of the rule to satisfy concerns relating 
to the merger of the RTC into the FDIC. The Corporation, with the 
concurrence of OGE, is now publishing, as an interim final rule, the 
Contractor Conflicts of Interest rule, to be codified in new part 366 
of 12 CFR chapter III.
    Pursuant to the Completion Act, OGE is providing its concurrence to 
those provisions of the interim final rule which govern conflicts of 
interest, ethical responsibilities, and the use of confidential 
information as applicable to independent contractors which are not 
deemed under 12 U.S.C. 1822(f)(1)(B) to be employees of the Corporation 
for purposes of Title 18 of the United States Code. Contractors who are 
deemed under 12 U.S.C. 1822(f)(1)(B) to be employees of the 
Corporation, are subject, in addition to the interim final rule, to 
Title 18 of the United States Code; the Standards of Ethical Conduct 
for Employees of the Executive Branch (5 CFR part 2635); the 
Supplemental Standards of Ethical Conduct for Employees of the Federal 
Deposit Insurance Corporation (5 CFR part 3201); the Executive Branch 
Financial Disclosure, Qualified Trusts, and Certificates of Divestiture 
regulations (5 CFR part 2634); and the Supplemental Financial 
Disclosure Requirements for Employees of the Federal Deposit Insurance 
Corporation (5 CFR part 3202).

II. Summary of the Comments

    The Corporation received comments from four law firms and two 
corporations. The comments from the two corporations involved concerns 
over the administrative burden that might be imposed through compliance 
with the reporting requirements under Sec. 366.6 of the proposed rule. 
The comments from the law firms raised a variety of issues including 
the potential effects of state privacy laws, changes in the treatment 
of law firms, concerns over threshold amount in the definition of 
default on a material obligation, the impact of the rule on the use of 

[[Page 9591]]
subsidiaries, and the potential for former insiders of failed 
institutions to be involved in the liquidation of other failed 
institutions.

III. Analysis of the Comments and Changes to the Rule

Section 366.1  Authority, Purpose and Scope

    Authority. Section 366.1(a) of the proposed rule was modified by 
adding section 12(f)(4) of the Federal Deposit Insurance Act to the 
list of authorities.
    Purpose. Section 366.1(b) of the proposed rule was simplified by 
dividing the provision into its component parts and changing its 
language to be consistent with language used elsewhere in the rule.
    Scope. One of the law firm commenters suggested that the scope of 
the rule be limited by adding a provision which would provide that the 
existing policies concerning outside counsel conflicts of interest 
remain unchanged after adoption of the rule. The Board declined to 
modify the scope of the rule with regard to law firms. Section 19(a) of 
the Completion Act, codified at 12 U.S.C. 1822(f), does not provide an 
exception to its application for legal services contracts. To date, the 
FDIC's Legal Division has applied the Resolution Trust Corporation's 
(RTC) rule, 12 CFR part 1606, entitled Qualification of, Ethical 
Standards for, and Restrictions on the Use of Confidential Information 
by Independent Contractors (part 1606), in its contract relationships 
with law firms. Part 1606 was promulgated by the RTC in response to 
requirements imposed upon it by the Financial Institutions Reform, 
Recovery, and Enforcement Act of 1989 (FIRREA). The FDIC has 
substantially identical restrictions on the use of contractors imposed 
by the Completion Act. Thus, it is not expected that the FDIC's 
relationships with the law firms with which it contracts will 
substantially change after the promulgation of the interim final rule. 
However, in order to better clarify the scope of the rule, 
Sec. 366.1(c)(1) of the proposed rule was reorganized and revised in 
order to (1) eliminate unnecessary language and simplify the provision, 
(2) clearly set forth that the rule is applicable to law firms, (3) 
clarify the application of the rule to subcontractors of FDIC 
contractors, and (4) at the request of the Board, remove Corporate 
leases of real property from coverage under the rule.
    Section 366.1(c)(2) was not changed.
    Resolution Trust Corporation. Section 366.1(d) was simplified by 
eliminating unnecessary language.
    Previous policies. Section 366.1(e) was eliminated as being 
unnecessary. Effective on April 10, 1996, this part supersedes and 
replaces the FDIC's ``Statement of Policy on Contracting with Outside 
Firms'', which was published in the Federal Register on May 17, 1993, 
at 58 FR 28866.

Section 366.2  Definitions

    Affiliated business entity. Section 366.2(a), the definition of 
affiliated business entity, was modified at the request of OGE. The 
Office of Government Ethics believed that the discretionary aspect of 
the definition set forth in the proposed rule was too subjective and 
that FDIC concerns as to whether various types of relationships 
constitute affiliations are adequately addressed through the use of the 
defined term control in the affiliated business entity definition. 
Under the definition of control, the FDIC is able to determine that an 
entity is an affiliated business entity when such entity has the 
ability to exercise a controlling influence over a company's management 
and policies. Additionally, OGE suggested the deletion of the statement 
concerning when a subfranchiser would not be considered to be an 
affiliated business entity of its master franchiser on the basis that 
the remaining definition adequately addresses that issue.
    Company. The definition of company, as set forth in Sec. 366.2(b) 
of the proposed rule, was modified through the elimination of the term 
individual from such definition. The Office of Government Ethics 
disagreed with the proposed inclusion of the term individual since such 
term was not consistent with the remaining business enterprises listed 
under the definition and was contrary to the common meaning of such 
term. In making such change, it was determined to be unnecessary to 
separately define the term individual since its meaning is commonly 
understood. Revision of the definition of company also necessitated 
revision of the definitions of contractor, management official, and  
person.
    Contractor. The definition of contractor was changed due to the 
impact of changes to other definitions. In Sec. 366.2(e) of the 
proposed rule, a two-part definition was provided. Section 366.2(e)(1) 
provided that a contractor was a company which had submitted an offer 
to, or had a contractual arrangement with, the FDIC to perform 
services. Since the definition of company has been modified to exclude 
the term individual, the proposed rule was further modified by 
replacing the term company with person at Sec. 366.2(d) of the interim 
final rule in order to include individuals in the coverage of the 
definition of contractor. The second part of the definition of 
contractor, found at Sec. 366.2(e)(2) of the proposed rule, involved 
subcontracting relationships. Section 366.2(o) of the interim final 
rule provides a separate definition of the term subcontractor.
    Management official. The definition of the term management 
official, as set forth in Sec. 366.2(m) of the proposed rule, was 
modified at OGE's request to provide greater guidance in the use of 
such term. In the proposed rule, management official was defined to 
mean an individual who controls a company. In Sec. 366.2(i) of the 
interim final rule, management official is more specifically defined as 
a shareholder, employee, or partner who controls a company and any 
individual who directs the day-to-day operations of a company. For 
partnerships, all general partners are considered management officials, 
except when a partnership has a management or executive committee, in 
which case the members of such committees are considered management 
officials.
    Person. The definition of person, found at Sec. 366.2(q) of the 
proposed rule, was changed to be more compatible with its common 
meaning. One of the law firm commenters objected to the scope of the 
information that was required to be submitted by law firm employees 
under Sec. 366.6(a) of the proposed rule due to the mistaken belief 
that a more common definition of the word person was applicable. Since 
the definition set forth in the proposed rule is inconsistent with the 
common meaning of person and would likely cause confusion among 
contractors and those FDIC employees charged with enforcement of the 
rule, its definition was changed in the interim final rule to include 
an individual or company. Such change satisfied similar concerns which 
had been raised by OGE.
    Confidential information. The definition of confidential 
information, found at Sec. 366.2(c) of the proposed rule, was moved to 
Sec. 366.8(c) in the interim final rule and simplified by eliminating 
unnecessary language.
    Conflict of interest. The definition of conflict of interest, found 
at Sec. 366.2(d) of the proposed rule, was changed at the request of 
OGE and one of the corporate commenters in order to provide a more 
narrow definition and eliminate redundant language.
    Section 366.2(d)(1) of the proposed rule had two subparts. The 
first subpart, concerning actual adverse impact on a contractor's 
ability to impartially provide services, was determined to be 

[[Page 9592]]
included within the second subpart, which set forth that a conflict of 
interest would exist where a reasonable individual with knowledge of 
the relevant facts would question the contractor's ability to 
impartially provide services to the FDIC. Therefore, the first subpart 
was eliminated in the interim final rule and, with language changes to 
accommodate changes made to other definitions, the second subpart was 
rewritten to simplify the standard.
    Sections 366.2(d)(2) and (4) of the proposed rule were combined in 
Sec. 366.2(c)(4) of the interim final rule and their breadth reduced. 
Under the revised provision, the FDIC is able to determine that facts 
exist which would provide a contractor with an unfair competitive 
advantage which could benefit the contractor or any person with whom 
the contractor has or is likely to have a personal or business 
relationship. Such situations are likely to arise in situations where 
(1) a contractor or a person associated with the contractor intends to 
purchase assets held by the FDIC which were managed by the contractor; 
(2) information could be obtained by a contractor through the 
performance of an FDIC contract which would not be available to other 
bidders to a subsequent contract and which information could provide 
the contractor or a person associated with the contractor with an 
unfair competitive advantage in the preparation of its bid; and (3) 
confidential information could be obtained through the performance of 
an FDIC contract which would provide the contractor, or a person 
associated with the contractor, with information which could be 
utilized to obtain an advantage in the purchase of the securities of an 
insured depository institution. Such situations are not exclusive. OGE 
believed that the unintended advantage standard set forth in the 
original provision was vague and contractors would be unable to provide 
the requisite certifications for such standard. Additionally, the 
discretionary standard set forth in Sec. 366.2(d)(4) of the proposed 
rule was more narrowly tailored, yet, for the most part, is retained in 
Sec. 366.2(c)(4) of the interim final rule and allows the FDIC to 
review the myriad of possible factual scenarios to determine if 
performance under an FDIC contract has created a situation which would 
reduce competition in the marketplace.
    Section 366.2(d)(3) of the proposed rule, which specifically 
provides that a conflict of interest exists where a contractor is an 
adverse party to the FDIC in a lawsuit, was retained in 
Sec. 366.2(c)(2) of the interim final rule and the $50,000 threshold 
was removed. OGE questioned the need for such provision since such 
provision is a subset of the general standard set forth in 
Sec. 366.2(c)(1) of the interim final rule. However, the FDIC has 
experienced situations in which contractors have certified that they 
have no conflicts of interest under current FDIC policies while being 
an adversary to the FDIC in a lawsuit. The rationale most often 
provided by contractors to justify their contention that there was no 
conflict was that the litigation involved matters or insured depository 
institutions which were unrelated to the contracts under consideration. 
In order to avoid such problem, the provision has been retained in the 
interim final rule.
    Section 366.2(c)(3) of the interim final rule was added at the 
request of the Board in order to clearly state that a conflict of 
interest exists where a contractor has been suspended or debarred from 
contracting with other Federal entities. In planning the merger of the 
RTC into the FDIC, it was determined that it was appropriate for the 
FDIC to adopt a debarment program similar to that established by the 
RTC. To aid in properly administering such program, it was important 
that consideration of such program be included in the interim final 
rule.
    Control. Section 366.2(f)(1) of the proposed rule was not changed 
in the interim final rule, but was renumbered as Sec. 366.2(e). The 
Office of Government Ethics believed that Sec. 366.2(f)(2) of the 
proposed rule was redundant and requested that it be deleted. In 
response, the FDIC has dropped that proposed paragraph from this 
interim final rule.
    Default on a material obligation. At the suggestion of OGE, 
Sec. 366.2(g) of the proposed rule was modified in Sec. 366.2(f) of the 
interim final rule by clarifying FDIC's intent that if a qualifying 
default had ever occurred, it would be covered and by specifying that 
the determination of whether the $50,000 threshold amount had been met 
to qualify a default as a default on a material obligation would be 
considered beginning on the 90th day after delinquency and thereafter.
    One of the law firm commenters requested that the $50,000 threshold 
amount be raised due to possible punitive effects of the rule on honest 
and hard working persons who could be precluded from providing services 
to the FDIC as contractors due to circumstances beyond their control. 
The Board does not agree with the commenter's contention. The FDIC, in 
its ``Statement of Policy on Contracting with Outside Firms'', which 
was published in the Federal Register on May 17, 1993 (58 FR 28866), 
utilized a similar $50,000 threshold amount and did not experience a 
lack of contractors willing to perform services for the FDIC. 
Additionally, the scope of the definition is limited to defaults on 
loans or advances from insured depository institutions, the 
institutions for which the FDIC has responsibility for providing 
deposit insurance and resolution in the event of a failure, and it 
would be inappropriate for the FDIC to contract with entities that have 
significantly contributed to losses incurred by such institutions.
    Federal banking agency. The definition of Federal banking agency 
found at Sec. 366.2(h) of the proposed rule was deleted. Other changes 
to the rule made the definition unnecessary.
    The definition of Federal deposit insurance fund, found at 
Sec. 366.2(i) of the proposed rule, was combined with the definition of 
substantial loss to Federal deposit insurance funds, found at 
Sec. 366.2(t) of the proposed rule, and the revised rule set forth as 
the definition of substantial loss to Federal deposit insurance funds, 
found at Sec. 366.2(o) of the interim final rule.
    The definition of FDIC found at Sec. 366.2(j) of the proposed rule 
was modified to include the statutory citations for the authority of 
the Corporation to act as conservator and operator of a bridge bank. 
The revised definition is found at Sec. 366.2(g) of the interim final 
rule.
    The definition of insider found at Sec. 366.2(k) of the proposed 
rule was deleted. Other changes to the rule made the definition 
unnecessary.
    The definition of insured depository institution found at 
Sec. 366.2(l) of the proposed rule was not changed (see Sec. 366.2(h) 
of the interim final rule).
    The definition of management official found at 366.2(m) of the 
proposed rule was not changed (see 366.2(i) of the interim final rule).
    The first sentence in the definition of offer, found at 
Sec. 366.2(n) of the proposed rule, was simplified and an accommodation 
made for the removal of the definition of offeror. In the proposed 
version, an offer was defined to be a response submitted by an offeror 
to an FDIC solicitation. In the interim final rule, an offer is defined 
to be a proposal to provide services to the FDIC.
    The definition of offeror found at Sec. 366.2(o) of the proposed 
rule was deleted due to changes in the rule which made the use of such 
term unnecessary.
    The definition of pattern or practice of defalcation found in 
Sec. 366.2(p) of the proposed rule was not changed but the defined term 
was changed to pattern or practice of defalcation regarding 

[[Page 9593]]
obligations to better track the statutory language. See Sec. 366.2 (k).
    The definition of RTC found in Sec. 366.2(r) of the proposed rule 
was not changed (see Sec. 366.2(m)).
    The definition of solicitation found at Sec. 366.2(s) of the 
proposed rule was deleted due to changes in the rule which made the use 
of such term unnecessary.
    The definition of subcontractor found at Sec. 366.2(n) of the 
interim final rule was added to accommodate the suggestion of one of 
the commenters for greater clarity in the application of the rule to 
subcontractors.
    The definition of substantial loss to Federal deposit insurance 
funds found at 366.2(t) of the proposed rule was changed to delete 
366.2(t)(3), concerning nonrecourse loans made to insiders from an 
insured depository institution. Persons causing a loss due to such 
loans will otherwise be barred under the remaining definitions of 
substantial loss to Federal deposit insurance funds and the other 
disqualifying conditions found at 366.4(a) of the interim final rule. 
The revised definition is found at 366.2(o) of the interim final rule.

Section 366.3  Qualification of Contractors

    Since publication of the proposed rule, the FDIC has designated the 
FDIC Executive Secretary as the appropriate official to handle the 
matters which had been designated for the Contractor Fitness and 
Integrity Compliance Officer as referenced in Sec. 366.3(a)(2) of the 
proposed rule. Additionally, the provisions relating to the officials 
responsible for administration of the rule were simplified and provided 
with their own distinct section. In Sec. 366.3 of the interim final 
rule, entitled appropriate officials, the General Counsel and Executive 
Secretary, or their designees, are assigned responsibility for the 
administration of the rule with regard to law firms and other 
contractors, respectively. Section 366.3(b) of the proposed rule was 
moved to 366.4 of the interim final rule.

Section 366.4  Disqualification of Contractors

    At the request of OGE, Sec. 366.3(b) of the proposed rule, entitled 
Qualification for service on behalf of the FDIC, was moved to 
Sec. 366.4(a) of the interim final rule and Sec. 366.3(b)(5) was 
incorporated in Sec. 366.5 of the interim final rule. Section 366.4 was 
simplified by incorporating only the mandatory prohibitions on the use 
of contractors which were imposed on the FDIC by Section 19(a) of the 
Completion Act, 12 U.S.C. 1822(f)(4)(E). OGE believed separating the 
mandatory provisions from the conflict of interest provisions would 
decrease the possibility of confusion about the variant authority 
pursuant to which the respective provisions were being promulgated and 
the degree of discretion the FDIC may have with respect to issues 
arising under the respective authorities. By distinguishing between the 
mandatory prohibitions imposed by the Completion Act and conflicts of 
interest generally, the certifications required to be made under 
Sec. 366.6(a) of the interim final rule are more easily identified by 
contractors thereby simplifying the certification process. The 
separation of the mandatory bars from the conflict of interest 
provisions facilitates differentiation between those provisions 
requiring OGE concurrence and those not requiring such concurrence.
    Section 366.4(a) and (b) of the proposed rule were consolidated and 
simplified in Sec. 366.4(b) of the interim final rule. The terms 
offeror, person, and company were eliminated and replaced with the term 
contractor and unnecessary language was eliminated. Additionally, in 
order to avoid the significant administrative and contractual burdens 
which would be imposed by awarding a contract to a disqualified 
contractor, the 10 day requirement for reporting undisclosed 
disqualifying conditions was refined to be the earlier of 10 days after 
discovery or prior to award.
    Section 366.4(c) of the proposed rule was simplified in of the 
interim final rule. Additionally, Secs. 366.4(c)(2) and (3) of the 
interim final rule were moved from Sec. 366.8 of the proposed rule in 
order to provide greater clarity in the application of the provision. 
The moved provisions, as revised, provide the FDIC with the option to 
require that corrective action be taken by the contractor, to 
immediately terminate any contracts with the contractor in default and 
order a transfer of duties, or to declare any contracts with such 
contractor in default and temporarily waive such default in order to 
protect the FDIC's interests in the orderly transition of matters to a 
new contractor.
    Section 366.4(d) of the proposed rule was revised to provide for 
the possibility of a secondary review process apart from the 
appropriate official who originally rendered such decision. The 
secondary review would be based upon written application made to the 
Chairman of the FDIC, or the Chairman's designee.

Section 366.5  Contractor Conflicts of Interest and Ethical 
Responsibilities

    One of the law firm commenters was concerned that the example set 
forth in Sec. 366.5(a)(1) of the proposed rule could be construed as 
suggesting that an insider of an insured depository institution for 
which the FDIC or RTC has been appointed receiver would not have a 
conflict of interest with respect to a contract which involves services 
to an unrelated institution. The issue of whether a conflict of 
interest exists due to a person's former association with a failed 
institution would have to be determined on a case-by-case basis after 
review of the relationship of such person to the failed institution. 
However, in order to avoid inappropriate application of the standard, 
the examples were removed from the rule.
    At the request of OGE, the first sentence in Sec. 366.5(a) of the 
proposed rule was removed since it stated a matter which added no 
substance to the rule. The remainder of the provision was restated more 
succinctly and, as discussed above, the examples removed from the text. 
The rule, as restated, provides that the FDIC will not award contracts 
to contractors that have conflicts of interest associated with a 
particular contract or permit contractors to continue performance under 
existing contracts when such contractors have conflicts of interest, 
unless such conflicts are eliminated by the contractor or are waived by 
the appropriate FDIC official.
    At the request of OGE, the standard of review for waiver requests 
as provided in Sec. 366.5(b) and (c) of the proposed rule was 
consolidated in Sec. 366.5(b) of the interim final rule and revised to 
clearly state that waivers will only be granted when the interests of 
the FDIC in the contractor's participation outweigh the concern that a 
reasonable person may question the integrity of the FDIC's operations. 
The standard set forth in the proposed rule provided that a waiver 
would be granted pursuant to the discretion of the appropriate 
official. The Office of Government Ethics stated that, in the interests 
of fairness to contractors, a discernable standard of review should be 
provided in the rule to be applied to all waiver requests.
    The Office of Government Ethics also requested that Sec. 366.5(b) 
and (c) of the proposed rule, which provided separate procedures for 
pre- and post-offer requests for review of conflicts, be consolidated 
into one time-frame. Section 366.5(c) of the interim final rule 
provides the consolidated provision.

[[Page 9594]]

    The Office of Government Ethics requested that the separate 
treatment of contractors for legal services versus other services as 
provided in proposed Sec. 366.5(b), (c), and (d) be explained in the 
preamble and consolidated in the text of the rule through the use of 
one paragraph covering pre-bid requests for review of conflicts of 
interest for contractors other than law firms and sole practitioner 
lawyers. The interim final rule, in Sec. 366.5(c)(3), provides that 
requests for pre-bid review of conflicts for contractors other than law 
firms and sole practitioner attorneys will only be considered if the 
participation of the contractor in the bidding process is necessary to 
provide adequate competition. It is the FDIC's preference to do 
business only with contractors which do not have conflicts of interest. 
However, it is recognized that there may be situations in which there 
are few qualified contractors and the participation of contractors 
which have conflicts is important to encourage competition.
    With regard to the different treatment accorded law firms and sole 
practitioner lawyers in the conflict review process, the regulation 
recognizes the additional responsibilities that are placed on law firms 
and sole practitioner lawyers providing services to the FDIC and also 
observes the separate contracting processes that exist in the Legal 
Division for the selection and retention of contractors.
    Specifically, in addition to the conflicts of interest requirements 
imposed by this regulation, law firms and sole practitioner lawyers who 
are providing services to the FDIC are required to follow applicable 
provisions of their State Code of Professional Responsibility, the 
Model Rules of Professional Conduct and additional requirements set 
forth in the FDIC Legal Division's Guide for Outside Counsel and its 
Statement of Policies Concerning Outside Counsel Conflicts of Interest. 
Law firms and sole practitioner lawyers are also subject to a separate 
contracting process due to the close fiduciary relationship that a law 
firm or sole practitioner lawyer has when representing the FDIC. Law 
firms and sole practitioner lawyers are required to submit to the Legal 
Division an application to provide services which requires disclosure 
of any conflicts of interest existing under the broader requirements 
imposed upon lawyers. If the information submitted does not indicate 
the existence of any conditions that would bar retention, the law firm 
or sole practitioner lawyer is added to a list of available counsel. 
The list of available counsel provides the primary source for 
identifying lawyers available for engagement on specific legal matters 
and, if so identified, additional disclosure and review are required 
concerning case-specific qualification criteria. Counsel are also 
required to enter into a Legal Services Agreement with the Legal 
Division which governs all engagements with the FDIC. The selection and 
retention process for law firms and sole practitioner lawyers is 
substantially different from the process utilized for other 
contractors, which typically includes the development of a procurement 
requisition, the preparation and issuance of a request for proposals, 
and the subsequent evaluation of bids or proposals received. The 
establishment of a separate procedure under Sec. 366.5 for resolution 
or waiver of conflicts of interest for law firms and sole practitioner 
lawyers is an acknowledgement of relevant differences in type of 
services and the differing relationship that lawyers have with the FDIC 
as their client.
    Proposed Sec. 366.5(d) was also revised in the interim final rule 
to include the remedies available to the FDIC in the event a conflict 
of interest is discovered after contract award as was provided in 
proposed Sec. 366.8(a).
    Section 366.5(e) of the proposed rule was revised to provide for 
the possibility of a secondary review process apart from the 
appropriate official who originally rendered such decision. The 
secondary review would be based upon written application made to the 
Chairman of the FDIC, or the Chairman's designee. It also provides the 
FDIC with the discretion to stay corrective or other actions ordered by 
the appropriate official pending reconsideration of the decision.

Section 366.6  Information Required to be Submitted

    At the request of OGE, in order to provide greater specificity to 
contractors with respect to the scope of required certifications, 
proposed Sec. 366.6(a) was modified to specifically identify the 
Representations and Certifications Form to be submitted by all 
contractors with every offer. Also, the provision was altered to assure 
that FDIC would obtain the information the FDIC deems appropriate to 
make a determination with respect to disqualifying conditions and 
conflicts of interest. Additionally, the information to be included in 
the Representations and Certifications Form was tailored in 
Sec. 366.6(a)(1) to accommodate the changes in the structure of 
Secs. 366.4 and 366.5 of the interim final rule and reduced, at the 
request of one of the Corporate and law firm commenters to include only 
the contractor; proposed Sec. 366.6(a)(2) was reworked to accommodate 
the changes to the definitions and the required certifications reduced 
to include only the contractor or any company under the contractor's 
control; to accommodate the reductions in the certifications required 
under Sec. 366.6(a)(1) and (2) of the proposed rule while not imposing 
a significant paperwork collection on the contractor and the FDIC, 
Sec. 366.6(a)(3) in the interim final rule was added which requires 
that the contractor provide an agreement that it will not allow any 
employee, agent, or subcontractor to work on an FDIC contract unless it 
has first verified that such employee, agent, or subcontractor is not 
subject to disqualifying conditions or otherwise has a conflict of 
interest; and proposed Sec. 366.6(a)(3) was moved to Sec. 366.6(a)(4) 
of the interim final rule and the scope of the other information which 
can be requested narrowed to be dependent on the contract under 
consideration.
    One of the law firm commenters stated that the FDIC had acted 
outside the scope of its authority in imposing the requirement in 
proposed Sec. 366.6(a)(2) that a contractor provide a list and 
description of any defaults to insured depository institutions for the 
10-year period preceding the submission of an offer. The Board 
disagrees with the commenter's contention. The Completion Act, at 12 
U.S.C. 1822(f)(4)(C), requires the FDIC to obtain a list and 
description of any default to an insured depository institution for the 
5-year period preceding the submission of an offer to the FDIC and any 
other information as the Board may prescribe by regulation. The Board 
determined that since the Completion Act provisions were extracted from 
FIRREA, which was promulgated in 1989, it was important that the FDIC 
be informed as to whether a contractor or any company under the 
contractor's control defaulted on a material obligation for the 10 year 
period preceding the offer.
    A law firm commenter expressed concern that the information 
disclosure requirements contained in Sec. 366.6(a) of the proposed rule 
might conflict with California state laws involving privacy rights. 
However, the Completion Act, at 12 U.S.C. 1822(f)(4)(D), requires 
certain information be collected by the contractor for persons to be 
employed by a contractor to perform services under an FDIC contract.
    One of the law firm commenters objected to the scope of the 
disclosures to be made and was concerned that outside contractors of 
law firms would be required to make significant 

[[Page 9595]]
disclosures to the law firm in order for the law firm to continue to 
use such entities and enter into contracts with the FDIC. Additionally, 
both of the corporate commenter's objected to the scope of the 
certifications to be obtained under the proposed rule as applied to 
large diversified corporations and their employees since certifications 
would need to be obtained from all affiliated business entities and the 
employees of the contractor. Consideration to the commenters' concerns 
was given in the revision of Sec. 366.6 of the proposed rule. In 
Sec. 366.6(a) of the interim final rule, certifications regarding 
disqualifying factors and conflicts of interest must be provided for 
the contractor; a list of defaults must be provided for the contractor 
and any company under the contractor's control; and the contractor must 
agree that it will not allow any employee, agent, or subcontractor to 
perform services under the FDIC contract unless it verifies that such 
employee, agent, or subcontractor does not have a disqualifying 
condition or a conflict of interest and has not defaulted on a material 
obligation. The scope of the required certifications and disclosures 
was thus limited to those entities which would be directly involved in 
the performance of the FDIC contract or which are under the 
contractor's control.
    Section 366.6(b)(1) of the proposed rule was revised to reduce the 
reporting and review burden placed upon contractors and the FDIC. In 
the proposed rule, a contractor was required to obtain and submit 
certifications for all employees who were to provide services on any 
FDIC contract. Additionally, in Sec. 366.6(b)(2), the FDIC could 
request the submission of such information at any time. In 
Sec. 366.6(b) of the interim final rule, a contractor is required to 
obtain verification of the lack of disqualifying conditions and 
conflicts of interest for employees who will provide services on an 
FDIC contract and to provide the FDIC with immediate notification if 
the certifications provided in Sec. 366.6(a) were incorrect at the time 
of submission or subsequently became incorrect.
    At the request of OGE, Sec. 366.6(c) of the proposed rule was 
simplified in the interim final rule and provides that a contractor 
which fails to provide information may be determined by the FDIC to be 
ineligible for the award of an FDIC contract or in default under an 
existing contract with the FDIC.
    The Board was concerned that the reduction in the disclosures 
required to be submitted under the rule might provide an opportunity 
for abuse by contractors. In order to aid the FDIC in obtaining 
compliance with the rule, the proposed rule was modified through the 
addition of Sec. 366.6(d) which requires contractors to retain the 
records relied upon in making the requisite disclosures for three years 
after the expiration or termination of the relevant contract and to 
make such information available to the FDIC upon request.
    The Board was also concerned unforeseeable circumstances might 
require immediate contracting in order to protect the assets or 
interests of the FDIC. In order to provide reasonable protection and 
allow the FDIC to act promptly in order to protect its interests, 
Sec. 366.6(e) was added which provides that, in the event of an 
emergency, the FDIC may authorize delayed compliance with the rule. 
Delayed compliance is allowed only when it is necessary to protect FDIC 
personnel or property.
    To clarify that, on a contract-by-contract basis, the FDIC may add 
additional contractual conditions or limitations on a contractor, 
Sec. 366.6(f) was added. Part 366 establishes the minimum standards as 
required by the Completion Act and additional standards may be required 
as the FDIC deems appropriate.

Section 366.7  Minimum Ethical Standards for Independent Contractors

    Section 366.7 was added to the interim final rule to comply with 
the portion of the Completion Act that requires the FDIC to establish 
minimum ethical standards for contractors. Section 366.7(a) provides 
that a contractor shall not improperly solicit favors, gifts, or other 
items of monetary value; improperly use FDIC property; use its status 
as an FDIC contractor for its benefit except as contemplated by the 
contract; or make unauthorized promises or commitments on behalf of the 
FDIC.
    Section 366.7(b) and (c) identify potentially applicable criminal 
provisions to contractors that solicit or accept bribes or make false 
statements to the Government.
    The penalties for violating the provisions of Sec. 366.7 are 
provided in Sec. 366.7(d).

Section 366.8  Confidentiality of Information

    Section 366.7 of the proposed rule was modified at Sec. 366.8 of 
the interim final rule. Section 366.8(a) was added to provide a general 
duty to be adhered to by contractors in protection of confidential 
information.
    Section 366.8(b) sets forth the penalties for the failure to 
properly protect confidential information as required under 
Sec. 366.8(a).
    Section 366.8(c) defines confidential information as information 
obtained from the FDIC or a third party in connection with an FDIC 
contract but does not include information generally available to the 
public provided such information was not made publicly available by the 
contractor without appropriate authorization.

Section 366.9  Liability for Rescission or Termination

    Section 366.8(a) of the proposed rule set forth that the FDIC could 
rescind or terminate a contract with a contractor who violated the 
requirements of part 366. The termination provision has been set forth 
in each appropriate section of the interim final rule.
    Section 366.8(b) of the proposed rule was revised to accommodate 
the revised structure of the interim final rule and is now set forth in 
Sec. 366.9.

Section 366.10  Finality of Determination

    Section 366.9 of the proposed rule is now set forth at Sec. 366.10 
of the interim final rule.

IV. Matters of Regulatory Procedure

Regulatory Flexibility Act

    The Board of Directors has concluded that the interim final rule 
will not impose a significant economic hardship on small institutions. 
Therefore, the Board of Directors hereby certifies pursuant to section 
605 of the Regulatory Flexibility Act (5 U.S.C. 605) that the interim 
final rule will not have a significant economic impact on a substantial 
number of small business entities within the meaning of the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.).

Paperwork Reduction Act

    The FDIC's contract and procurement information requirements 
constitute a collection of information under the Paperwork Reduction 
Act (44 U.S.C. 3501 et seq.). The collection pursuant to the proposed 
rule was reviewed and approved by the Office of Management and Budget 
(OMB) under control number 3064-0072. Any changes made to the 
Representations and Certifications forms resulting from the 
promulgation of this interim final rule will be submitted to OMB for 
review and approval pursuant to the Paperwork Reduction Act.

List of Subjects in 12 CFR Part 366

    Conflict of interests, Government contracts, Reporting and 
recordkeeping requirements.

[[Page 9596]]

    For the reasons set forth in the preamble, pursuant to its 
authority under section 19 of the Resolution Trust Corporation 
Completion Act, the Board of Directors of the FDIC, with the 
concurrence of OGE, amends title 12, Chapter III of the Code of Federal 
Regulations by adding part 366 to read as follows:

PART 366--CONTRACTOR CONFLICTS OF INTEREST

Sec.
366.1  Authority, purpose, and scope.
366.2  Definitions.
366.3  Appropriate officials.
366.4  Disqualification of contractors.
366.5  Contractor conflicts of interest.
366.6  Information required to be submitted.
366.7  Minimum ethical standards for independent contractors.
366.8  Confidentiality of information.
366.9  Liability for rescission or termination.
366.10  Finality of determination.

    Authority: 12 U.S.C. 1819, 1822(f)(3) and (4).

Sec. 366.1  Authority, purpose, and scope.

    (a) Authority. This part is adopted pursuant to section 12(f)(3) 
and (4) of the Federal Deposit Insurance Act, 12 U.S.C. 1822(f)(3) and 
(4), and the rule-making authority of the Federal Deposit Insurance 
Corporation (FDIC) found at 12 U.S.C. 1819. Pursuant to those sections 
and consistent with the goals and purposes of titles 18 and 41 of the 
U.S. Code, the FDIC is promulgating regulations in this part applicable 
to independent contractors governing conflicts of interest, ethical 
responsibilities, and the use of confidential information. The 
regulations in this part also establish procedures for ensuring that 
independent contractors meet minimum standards of competence, 
experience, integrity, and fitness. The FDIC will apply this part to 
contractual activities it undertakes, including situations in which it 
is acting as manager of the Federal Savings and Loan Insurance 
Corporation (FSLIC) Resolution Fund (FRF). This part is in addition to, 
and not in lieu of, any other statute or regulation which may apply to 
such contractual activities. This part does not apply to the FDIC when 
acting as a conservator of a failed financial institution or when 
operating a bridge bank.
    (b) Purpose. Consistent with the goals and purposes of titles 18 
and 41 of the U.S. Code, this part seeks to establish:
    (1) Minimum standards which govern conflicts of interest, ethical 
responsibilities, and the use of confidential information by 
contractors;
    (2) Procedures to ensure that independent contractors meet minimum 
standards of competence, experience, integrity, and fitness; and
    (3) Official written guidance to contracting personnel who award 
contracts for services and to contractors who bid on such contracts.
    (c) Scope. (1) (i) This part applies to:
    (A) Contractors, including law firms and other independent 
contractors, that are not deemed, under 12 U.S.C. 1822(f)(1)(B), to be 
employees of the FDIC, which submit offers to provide services to the 
FDIC or which enter into contracts for services with the FDIC; and
    (B) Subcontractors which enter into contracts to perform services 
under a proposed or existing contract with the FDIC.
    (ii) Contractors that are deemed under 12 U.S.C. 1822(f)(1)(B) to 
be employees of the Corporation are subject, in addition to this part, 
to Title 18 of the United States Code; the Standards of Ethical Conduct 
for Employees of the Executive Branch (5 CFR part 2635); the 
Supplemental Standards of Ethical Conduct for Employees of the Federal 
Deposit Insurance Corporation (5 CFR part 3201); the Executive Branch 
Financial Disclosure, Qualified Trusts, and Certificates of Divestiture 
regulations (5 CFR part 2634); and the Supplemental Financial 
Disclosure Requirements for Employees of the Federal Deposit Insurance 
Corporation (5 CFR part 3202).
    (2) For all contractors subject to this part, the FDIC will apply 
this part to contracts which are entered into between the contractors 
and the FDIC on or after April 10, 1996. In addition, this part applies 
to contracts between contractors subject to this part and the FDIC 
which exist on April 10, 1996 for which a contractual action, such as a 
modification, extension, or exercise of an option, takes place on or 
after April 10, 1996.
    (d) Resolution Trust Corporation transition. This part shall apply 
to all RTC contractors that provide services to the FDIC after the 
RTC's termination which occurred, by statute, December 31, 1995.

Sec. 366.2  Definitions.

    As used in this part:
    (a) Affiliated business entity means a company that is under the 
control of the contractor, is in control of the contractor or is under 
common control with the contractor.
    (b) Company means any corporation, firm, partnership, society, 
joint venture, business trust, association or similar organization, or 
any other trust unless by its terms it must terminate within twenty-
five years or not later than twenty-one years and ten months after the 
death of individuals living on the effective date of the trust, or any 
other organization or institution, but shall not include any 
corporation the majority of the shares of which are owned by the United 
States, any state, or the District of Columbia.
    (c) Conflict of interest means a situation in which:
    (1) A contractor; any management officials or affiliated business 
entities of a contractor; or any employees, agents, or subcontractors 
of a contractor who will perform services under a proposed or existing 
contract with the FDIC, has one or more personal, business, or 
financial interests or relationships which would cause a reasonable 
individual with knowledge of the relevant facts to question the 
integrity or impartiality of those who are or will be acting under a 
proposed or existing FDIC contract; or
    (2) A contractor; any management officials or affiliated business 
entities of a contractor; or any employees, agents, or subcontractors 
of a contractor who will perform services under a proposed or existing 
contract with the FDIC, is an adverse party to the FDIC, RTC, FSLIC, or 
their successors in a lawsuit; or
    (3) A contractor; any management officials or affiliated business 
entities of a contractor; or any employees, agents, or subcontractors 
of a contractor who will perform services under a proposed or existing 
contract with the FDIC, has ever been suspended, excluded, or debarred 
from contracting with a Federal entity or has ever had a contract with 
the FDIC, RTC, FSLIC or their successors rescinded or terminated prior 
to the contract's completion and which rescission or termination 
involved issues of conflicts of interest or ethical responsibilities; 
or
    (4) Any other facts exist which the FDIC, in its sole discretion, 
determines may, through performance of a proposed or existing FDIC 
contract, provide a contractor with an unfair competitive advantage 
which favors the interests of the contractor or any person with whom 
the contractor has or is likely to have a personal or business 
relationship.
    (d) Contractor means a person which has submitted an offer to 
perform services for the FDIC or has a contractual arrangement with the 
FDIC to perform services.
    (e) Control means the power to vote, directly or indirectly, 25 
percent or more of any class of the voting stock of a company; the 
ability to direct in any manner the election of a majority of a 
company's directors or trustees; or the ability to exercise a 
controlling influence over the company's management and policies. For 
purposes 

[[Page 9597]]
of this definition, a general partner of a limited partnership is 
presumed to be in control of that partnership.
    (f) Default on a material obligation means a loan or advance from 
an insured depository institution which has ever been delinquent for 90 
or more days as to payment of principal or interest, or a combination 
thereof, with a remaining balance of principal and accrued interest on 
the ninetieth day, or any time thereafter, in an amount in excess of 
$50,000.
    (g) FDIC means the Federal Deposit Insurance Corporation in its 
receivership and corporate capacities. It does not mean the FDIC in its 
conservatorship capacity or when it is operating a bridge bank as 
defined, respectively, in 12 U.S.C. 1821(c) and (n).
    (h) Insured depository institution means any bank or savings 
association the deposits of which are insured by the FDIC.
    (i) Management official means any shareholder, employee or partner 
who controls a company and any individual who directs the day-to-day 
operations of a company. With respect to a partnership whose management 
committee or executive committee has responsibility for the day-to-day 
operations of the partnership, management official means only a member 
of such committee but, if no such committee exists, management official 
means each of the general partners.
    (j) Offer means a proposal to provide services to the FDIC. For law 
firms or sole practitioner lawyers, ``offer'' also means the 
application submitted by the law firm to the FDIC.
    (k) Pattern or practice of defalcation regarding obligations means 
two or more instances in which:
    (1) A loan or advance from an insured depository institution is in 
default for ninety (90) or more days as to payment of principal, 
interest, or a combination thereof and there remains a legal obligation 
to pay an amount in excess of $50,000; or
    (2) A loan or advance from an insured depository institution where 
there has been a failure to comply with the terms to such an extent 
that the collateral securing the loan or advance was foreclosed upon, 
resulting in a loss in excess of $50,000 to the insured depository 
institution.
    (l) Person means an individual or company.
    (m) RTC means the former Resolution Trust Corporation in any of its 
capacities.
    (n) Subcontractor means a person that enters into a contract with 
an FDIC contractor to perform services under a proposed or existing 
contract with the FDIC.
    (o) Substantial loss to Federal deposit insurance funds means:
    (1) A loan or advance from an insured depository institution, which 
is currently owed to the FDIC, RTC, FSLIC or their successors, or the 
Bank Insurance Fund (BIF), the Savings Association Insurance Fund 
(SAIF), the FRF, or funds maintained by the RTC for the benefit of 
insured depositors, that is or has ever been delinquent for ninety (90) 
or more days as to payment of principal, interest, or a combination 
thereof and on which there remains a legal obligation to pay an amount 
in excess of $50,000;
    (2) An obligation to pay an outstanding, unsatisfied, final 
judgment in excess of $50,000 in favor of the FDIC, RTC, FSLIC, or 
their successors, or the BIF, the SAIF, the FRF or the funds maintained 
by the RTC for the benefit of insured depositors; or
    (3) A loan or advance from an insured depository institution which 
is currently owed to the FDIC, RTC, FSLIC or their successors, or the 
BIF, the SAIF, the FRF or the funds maintained by the RTC for the 
benefit of insured depositors, where there has been a failure to comply 
with the terms to such an extent that the collateral securing the loan 
or advance was foreclosed upon, resulting in a loss in excess of 
$50,000.

Sec. 366.3  Appropriate officials.

    (a) The General Counsel of the FDIC, or the designee of the General 
Counsel, shall administer the provisions of this part with respect to 
contracts involving the provision of services by law firms or sole 
practitioner lawyers.
    (b) The FDIC Executive Secretary, or the designee of the Executive 
Secretary, shall administer the provisions of this part with respect to 
all other contracts.

Sec. 366.4  Disqualification of contractors.

    (a) Disqualifying conditions. No person shall perform services 
under an FDIC contract and no contractor shall enter into any contract 
with the FDIC if that person or contractor:
    (1) Has been convicted of any felony;
    (2) Has been removed from, or prohibited from participating in the 
affairs of, any insured depository institution pursuant to any final 
enforcement action by the Office of the Comptroller of the Currency, 
the Office of Thrift Supervision, the Board of Governors of the Federal 
Reserve System, or the Federal Deposit Insurance Corporation or their 
successors;
    (3) Has demonstrated a pattern or practice of defalcation regarding 
obligations; or
    (4) Has caused a substantial loss to Federal deposit insurance 
funds.
    (b) Contractors with disqualifying conditions arising prior to 
contract award. (1) A contractor which has any of the disqualifying 
conditions identified in paragraph (a) of this section prior to the 
award of an FDIC contract is disqualified and is prohibited from 
entering into contracts with the FDIC.
    (2) If after submitting an offer but prior to award, a contractor 
discovers that it has any of the disqualifying conditions identified in 
paragraph (a) of this section, it shall notify the FDIC in writing 
within 10 days or prior to award, whichever is earlier.
    (c) Disqualifying conditions that arise or are discovered after 
contract award. A contractor must notify the FDIC in writing within 10 
days after discovering that it or any person performing services under 
an FDIC contract has any of the disqualifying conditions identified in 
paragraph (a) of this section. Such notification shall contain a 
detailed description of the disqualifying condition and may include a 
statement of how the contractor intends to resolve such condition. The 
FDIC, after receipt of such notification or other discovery of the 
contractor's disqualifying condition, shall take such action as it 
determines is in the FDIC's best interests, including that:
    (1) The FDIC may notify the contractor in writing of the corrective 
actions, if any, which the contractor must take to eliminate the 
disqualifying condition. Corrective actions must be completed by the 
contractor not later than 30 days after notification is mailed by the 
FDIC unless the FDIC, at its sole discretion, determines that it will 
be in the best interests of the FDIC to grant the contractor an 
extension of time in which to complete such corrective action;
    (2) The FDIC may immediately declare any contracts with such 
contractor in default, terminate the contracts, and order an immediate 
transfer of duties and responsibilities under the contracts; or
    (3) The FDIC may declare any contracts with such contractor in 
default and temporarily waive such default in order to allow an orderly 
transfer of duties and responsibilities under the contracts.
    (d) Reconsideration of decisions. Decisions issued by the FDIC may 
be reconsidered upon application by an affected party to the Chairman 
or the Chairman's designee. Such requests 

[[Page 9598]]
shall be in writing and contain the bases for the request. The FDIC, at 
its discretion and after determining that it is in its best interests, 
may stay any corrective or other actions ordered by it pending 
reconsideration of a decision.

Sec. 366.5  Contractor conflicts of interest.

    (a) General. The FDIC will not award contracts to contractors that 
have conflicts of interest associated with a particular contract or 
permit contractors to continue performance under existing contracts 
when such contractors have conflicts of interest, unless such conflicts 
are eliminated by the contractor or are waived by the appropriate FDIC 
official.
    (b) Waivers. Waivers of conflicts of interest will only be granted 
when, in light of all relevant circumstances, the interests of the FDIC 
in the contractor's participation outweigh the concern that a 
reasonable person may question the integrity of the FDIC's operations.
    (c) Conflicts of interest arising prior to contract award (1) 
Requests for review of conflicts of interest. (i) A contractor, with 
its offer, may request a determination as to the existence of a 
conflict of interest, may request that the conflict of interest, if 
any, be waived in accordance with paragraph (b) of this section, or may 
propose how the contractor could eliminate the conflict.
    (ii) If after submitting an offer, but prior to award, a contractor 
discovers that it has a conflict, it shall notify the FDIC in writing 
within 10 days or prior to award, whichever is earlier. The contractor, 
with its notice, may make such requests or proposals regarding the 
conflict or potential conflict as are described in paragraph (c)(1)(i) 
of this section.
    (2) Review by the FDIC. (i) Subject to the restrictions set forth 
in paragraphs (c)(2)(ii) and (c)(3) of this section, the appropriate 
FDIC official, at his or her sole discretion, may determine whether a 
conflict of interest exists, may waive the conflict of interest in 
accordance with paragraph (b) of this section, or may approve in 
writing a contractor's proposal to eliminate a conflict of interest.
    (ii) For contractors other than law firms and sole practitioner 
lawyers, the FDIC may consider a contractor's conflict or potential 
conflict of interest only if the FDIC first determines that the 
contractor's offer is the most advantageous of all received.
    (3) Pre-bid requests and pre-bid review for contractors other than 
law firms and sole practitioner lawyers. A request for pre-bid review 
must be in writing and describe in detail the conflict or potential 
conflict of interest. The request may provide a proposal for 
elimination of the conflict or request a waiver of the conflict. The 
FDIC may perform a pre-bid review of conflicts of interest only if it 
first determines, at its sole discretion, that the participation of the 
contractor in the bidding process is necessary to provide adequate 
competition.
    (d) Conflicts of interest that arise or are discovered after 
contract award. A contractor shall notify the FDIC in writing within 10 
days after discovering that it has a conflict of interest. Such 
notification shall contain a detailed description of the conflict of 
interest and state how the contractor intends to eliminate the 
conflict. The FDIC, after receipt of such notification or other 
discovery of the contractor's conflict or potential conflict of 
interest, shall take such action as it determines is in the FDIC's best 
interests, including that:
    (1) The FDIC may notify the contractor in writing of its finding as 
to whether a conflict of interest exists and the basis for such 
determination; whether or not a waiver will be granted; or whether 
corrective actions may be taken in order to eliminate the conflict of 
interest. Corrective actions must be completed by the contractor not 
later than 30 days after notification is mailed by the FDIC unless the 
FDIC, at its sole discretion, determines that it is in the best 
interests of the FDIC to grant the contractor an extension in which to 
complete such corrective action;
    (2) The FDIC may immediately declare any affected contracts with 
such contractor in default, terminate the contracts, and order an 
immediate transfer of duties and responsibilities under such contracts; 
or
    (3) The FDIC may declare any affected contract with such contractor 
in default and temporarily waive such default in order to allow an 
orderly transfer of duties and responsibilities under such contract.
    (e) Reconsideration of decisions. Decisions issued pursuant to this 
part may be reconsidered by the Chairman or the Chairman's designee 
upon application by the contractor. Such requests shall be in writing 
and shall contain the bases for the request. The FDIC, at its 
discretion and after determining that it is in its best interests, may 
stay any corrective or other actions ordered by the FDIC pending 
reconsideration of a decision.

Sec. 366.6  Information required to be submitted.

    (a) Initial submission. Every offer submitted to the FDIC by any 
contractor shall include a completed Representations and Certifications 
Form and such other information as the FDIC may deem appropriate to 
permit it to make a determination with respect to disqualifying 
conditions or conflicts of interest. The Representations and 
Certifications Form shall require that the contractor provide the 
following:
    (1) Certifications that, to the best of the contractor's knowledge, 
the contractor is not disqualified from service on behalf of the FDIC 
because of the existence of any of the conditions identified in 
Sec. 366.4(a), or conflicts of interest as defined in Sec. 366.2(c)(1) 
through (3), subject to the contractor's request for waiver of a 
conflict of interest or proposal for elimination of a conflict of 
interest as described in Sec. 366.5;
    (2) A list and description of any instance during the ten (10) 
years preceding the submission of the offer in which the contractor or 
any company under the contractor's control defaulted on a material 
obligation to any insured depository institution;
    (3) The contractor's agreement that it will not allow any employee, 
agent, or subcontractor to perform services under the proposed contract 
with the FDIC unless the contractor first verifies with each such 
employee, agent, or subcontractor that, to the best of such person's 
knowledge, such person:
    (i) Is not disqualified from performing services under the FDIC 
contract because of the existence of any of the conditions identified 
in Sec. 366.4(a);
    (ii) Has no conflicts of interest as defined in Sec. 366.2(c)(1) 
through (3), subject to a request by the contractor for a conflict of 
interest waiver or proposal for the elimination of a conflict of 
interest as set forth in Sec. 366.5; and
    (iii) Has not, during the ten (10) years preceding the submission 
of the offer, defaulted on a material obligation to any insured 
depository institution; and
    (4) Any other information which the FDIC may deem appropriate, the 
scope of which will be dependent on the particular contract under 
consideration.
    (b) Subsequent submissions. During the term of the contract, the 
contractor shall:
    (1) Verify the information described in paragraph (a)(3) of this 
section for any employee, agent, or subcontractor who will perform 
services under the contract for whom such information has not been 
previously verified, prior to such employee, agent, or subcontractor 
performing services under the contract; and
    (2) Immediately notify the FDIC if any of the information submitted 
pursuant to paragraph (a) of this section was incorrect at time of 
submission or has subsequently become incorrect. 

[[Page 9599]]

    (c) Failure to provide information. A contractor that fails to 
provide any required information or misstates a material fact may be 
determined by the FDIC to be ineligible for the award of the FDIC 
contract for which such information is required or to be in default 
with respect to any existing contract for which such information is 
required.
    (d) Retention of information. A contractor shall retain the 
information upon which it relied in preparing its certification(s) 
during the term of the contract and for a period of three (3) years 
following the termination or expiration of the contract and shall make 
such information available for review by the FDIC upon request.
    (e) Delayed compliance in emergencies. In emergencies, when 
unforeseeable circumstances make it necessary to contract immediately 
in order to protect FDIC personnel or property, the FDIC may authorize 
delayed compliance with this part.
    (f) Additional contractual requirements. In addition to the 
provisions of this part, the FDIC may include in its contract 
provisions, conditions and limitations, including additional standards 
for contractor fitness and integrity.

Sec. 366.7  Minimum ethical standards for independent contractors.

    (a) In connection with the performance of any contract and during 
the term of such contract, a contractor, shall not:
    (1) Accept or solicit for itself or others favors, gifts, or other 
items of monetary value from any person the contractor knows is seeking 
official action from the FDIC in connection with the contract or has 
interests which may be substantially affected by the contractor's 
performance or nonperformance of duties to the FDIC;
    (2) Use improperly or allow the improper use of FDIC property, or 
property over which the contractor has supervision or charge by reason 
of the contract;
    (3) Use its status as an FDIC contractor for its personal, 
financial or business benefit or for the benefit of a third party, 
except as contemplated by the contract;
    (4) Make any promise or commitment on behalf of the FDIC not 
authorized by the FDIC.
    (b) Pursuant to 18 U.S.C. 201, whoever acts for or on behalf of the 
FDIC is deemed to be a public official and public officials are 
prohibited from soliciting or accepting anything of value in return for 
being influenced in the performance of official actions. Violators are 
subject to criminal sanctions under Title 18 of the United States Code.
    (c) Pursuant to 18 U.S.C. 1001, whoever knowingly and willingly 
falsifies a material fact, makes a false statement, or utilizes a false 
writing in connection with an FDIC contract is subject to criminal 
sanctions under Title 18 of the United States Code.
    (d) A contractor that violates the provisions of this section may 
be determined by the FDIC to be ineligible for the award of an FDIC 
contract and the FDIC may determine that such contractor is in default 
under any existing FDIC contract.

Sec. 366.8  Confidentiality of information.

    (a) A contractor has a duty to protect confidential information and 
shall not use or allow the use of confidential information to further a 
private interest other than as contemplated by the contract.
    (b) If a contractor fails to comply with the provisions of this 
section, the FDIC may:
    (1) Declare the contractor ineligible for the award of any FDIC 
contract not yet awarded; or
    (2) Declare the contractor in default under any existing contract 
with the FDIC.
    (c) As used in this section, ``confidential information'' means 
information that a contractor obtains from the FDIC or a third party in 
connection with an FDIC contract but does not include information 
generally available to the public unless the information becomes 
available to the public as a result of unauthorized disclosure by the 
contractor.

Sec. 366.9  Liability for rescission or termination.

    The FDIC may seek its actual, direct, and consequential damages 
from a contractor whose disqualifying conditions, conflicts of 
interest, failure to comply with information submission or 
confidentiality requirements, or failure to comply with the minimum 
ethical standards for independent contractors were the basis for 
rescission or termination of a contract between the FDIC and the 
contractor. This right to terminate or rescind and these remedies are 
cumulative and in addition to any other remedies or rights the FDIC may 
have under the terms of the contract, at law, or otherwise.

Sec. 366.10  Finality of determination.

    Any determination made by the FDIC pursuant to this part is at the 
FDIC's sole discretion and shall not be subject to further review.

    By Order of the Board of Directors.

    Dated at Washington, D.C. this 6th day of February 1996.

Federal Deposit Insurance Corporation.
Jerry L. Langley,
Executive Secretary.
    Concurred in this 27th day of February 1996.
Stephen D. Potts,
Director, Office of Government Ethics.
[FR Doc. 96-5254 Filed 3-8-96; 8:45 am]
BILLING CODE 6714-01-P

Complete official Federal Register PDF

FR Doc. 96-5165 Filing and Reporting Requirements for Interstate Natural Gas Company Rate Schedules and Tariffs Final Rule; Order on Rehearing
[Federal Register Volume 61, Number 48 (Monday, March 11, 1996)]
[Rules and Regulations]
[Pages 9613-9637]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-5165]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 154

[Docket No. RM95-3-001; Order No. 582-A]

Filing and Reporting Requirements for Interstate Natural Gas 
Company Rate Schedules and Tariffs Final Rule; Order on Rehearing

Issued: February 29, 1996.
AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Final rule; Order on rehearing.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission is issuing an order 
on the requests for rehearing of Order No. 582, the final rule amending 
part 154 of the Commission's regulations under the Natural Gas Act. 
That order adopted procedural rules governing the form and composition 
of interstate natural gas pipeline tariffs and the filing of rates and 
charges for the transportation of natural gas in interstate commerce 
under sections 4 and 5 of the Natural Gas Act (NGA) and section 311 of 
the Natural Gas Policy Act. Also, minor modifications to the electronic 
filing instructions for tariff sheets are added as an appendix.

EFFECTIVE DATE: The revised regulations will become effective April 10, 
1996.

FOR FURTHER INFORMATION CONTACT: Richard A. White, Office of the 
General Counsel, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426, (202) 208-0491.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of 
this document in the Federal Register, the Commission also provides all 
interested persons an opportunity to inspect or copy the contents of 
this document during normal business hours at 888 First Street, NE., 
Washington, DC 20426.
    The Commission Issuance Posting System (CIPS), an electronic 
bulletin board service, provides access to the texts of formal 
documents issued by the Commission. CIPS is available at no charge to 
the user and may be accessed using a personal computer with a modem by 
dialing (202) 208-1397 if dialing locally or 1-800-856-3720 if dialing 
long distance. To access CIPS, set your communications software to 
19200, 14400, 12000, 9600, 7200, 4800, 2400, or 1200 bps, full duplex, 
no parity, 8 data bits, and 1 stop bit. The full text of this document 
will be available on CIPS indefinitely in ASCII and WordPerfect 5.1 
format. The complete text on diskette in Wordperfect format may also be 
purchased from the Commission's copy contractor, La Dorn Systems 
Corporation, also located in the Public Reference Room at 888 First 
Street, NE., Washington, DC 20426.
    This order grants, in part, and denies, in part, requests for 
rehearing of Order No. 582 (Rule).1 That order adopted procedural 
rules governing the form and composition of interstate natural gas 
pipeline tariffs and the filing of rates and charges for the 
transportation of natural gas in interstate commerce under sections 4 
and 5 of the Natural Gas Act (NGA) and section 311 of the Natural Gas 
Policy Act. Also, minor modifications to the electronic filing 
instructions for tariff sheets are added as an appendix.

    \1\ Filing and Reporting Requirements for Interstate Natural Gas 
Companies Rate Schedules and Tariffs, Order No. 582, 60 FR 52960 
(October 11, 1995), II FERC Stats. & Regs. para. 19,100-19,183 
(1995)(regulatory text), III FERC Stats. & Regs. para. 31,025 
(1995)(preamble). This order on rehearing is a companion to the 
order on rehearing, issued concurrently in Docket No. RM95-4-001, 
which concerns amendments to, among other things, the Uniform System 
of Accounts and FERC Form No. 2. Revisions to Uniform System of 
Accounts Forms, Statements, and Reporting Requirements for Natural 
Gas Companies, Order No. 581, 60 FR 53019 (October 11, 1995), 72 
FERC para. 61,301 (1995).
---------------------------------------------------------------------------

I. Background

    On September 28, 1995, the Commission issued Order No. 582, the 
final rule in Docket No. RM95-3-000 revising part 154, Chapter I, Title 
18, Code of Federal Regulations. 2 This order responds to requests 
for rehearing or clarification of the Rule filed by Amoco Production 
Company, et al. (Amoco), American Forest and Paper Association, ANR 
Pipeline/Colorado Interstate Gas Co.(ANR/CIG), Associated Gas 
Distributors (AGD), Chevron, U.S.A. Inc. et al. (Chevron), Colorado 
Interstate Gas Company, Columbia Gas Transmission/Columbia Gulf 
Transmission, Great Lakes Gas Transmission (Great Lakes), Interstate 
Natural Gas Association of America (INGAA), JMC Power Projects, Natural 
Gas Supply Association (NGSA), Mississippi River Transmission Co. 
(MRT), Natural Gas Clearinghouse, Natural Gas Supply Association 
(NGSA), Panhandle Eastern Pipe Line, Texas Eastern Transmission Corp., 
and Williston Basin Interstate Pipeline Company.

    \2\ Filing and Reporting Requirements for Interstate Natural Gas 
Company Rate Schedules and Tariffs, 60 FR 3111 (January 13, 1995), 
IV FERC Stats. & Regs. para. 32,511 (1995).
---------------------------------------------------------------------------

II. Discussion

a. Section 154.1  Application; Obligation to File

1. Requests for Rehearing
    Section 154.1(d) requires that any executed service agreement which 
deviates in a material aspect from the form of service agreement in a 
pipeline's tariff must be filed with the Commission. 3 This 
requirement codified existing Commission policy. 4

    \3\ Section 154.1, Application; Obligation to file, requires:
    (b) Every natural gas company must file with the Commission and 
post in conformity with the requirements of this part, schedules 
showing all rates and charges for any transportation or sale of 
natural gas subject to the jurisdiction of the Commission, and the 
classifications, practices, rules, and regulations affecting such 
rates, charges, and services, together with all contracts related 
thereto.
    (d) For the purposes of paragraph (b) of this section, any 
contract that conforms to the form of service agreement that is part 
of the pipeline's tariff pursuant to Sec. 154.110 does not have to 
be filed. Any contract or executed service agreement which deviates 
in any material aspect from the form of service agreement in the 
tariff is subject to the filing requirements of this part.
    \4\ See, Tennessee Gas Pipeline Company, et al., 65 FERC para. 
61,356 (1993); reh'g denied, 67 FERC para. 61,196 (1994).
---------------------------------------------------------------------------

    Amoco argues that the Rule violates section 4(c) of the NGA by 
allowing the interstate pipelines to make substantive deviations from 
pro forma contracts without honoring the statutory and regulatory duty 
to file contracts with the Commission so that the public and shippers 
can determine whether or not they have been subjected to undue 
discrimination.5

    \5\ The Commission has included as Sec. 154.1(b) the description 
of the purpose of part 154, which reflects the requirement of 
Section 4(c) of the NGA that every natural gas company must file 
with the Commission, and maintain open for public inspection, its 
schedules and contracts. 15 U.S.C. Sec. 717c(c). 

[[Page 9614]]

---------------------------------------------------------------------------

    Amoco states that the regulatory text is correct as a matter of law 
and policy. However, Amoco states that the Commission eviscerated the 
regulation by not defining ``materiality,'' and eliminating the items 
most likely to be the instrument of undue discrimination and unjust and 
unreasonable terms and conditions from qualification as ``material 
deviations.'' Amoco took the items listed in the Preamble as not likely 
to trigger a filing, and argues that, under certain circumstances, 
unfair discrimination could occur.
    Amoco states that any material deviations from the tariff (which 
include those items excluded by dicta in Order No. 582) should be filed 
in order to be sure that there is no undue discrimination.
2. Commission Response
    The use of forms of service agreements as the basis of contracts 
between a pipeline and its customers ensures that there are no 
unreasonable differences among the pipeline's customers as to the 
rates, charges, services, or facilities, while minimizing the amount of 
paper filed with the Commission. A contract that conforms to a pro 
forma service agreement need not be filed with the Commission because 
the Commission has already considered and determined that the pro forma 
service agreement is just and reasonable. Any contract that deviates in 
a material way from a pro forma service agreement must be evaluated 
anew to determine that it is not unjust, unreasonable, unduly 
preferential, or otherwise unacceptable.
    Many commenters to the NOPR requested the Commission to be more 
specific as to what deviations or substantive additional provisions 
will trigger this filing requirement.6 To accommodate these 
requests the Preamble gave examples of provisions that would not 
normally be expected to be ``material'' deviations.7

    \6\ For example, Columbia requested that the Commission clarify 
that specifically drafted provisions addressing flow rates, pressure 
obligations, maximum delivery obligations, term, and other ``tariff-
contemplated'' items are not ``material'' deviations. Amoco, et al., 
requested that the Commission clarify ``material deviations,'' such 
that contracts must be filed which provide for any difference (from 
that specified in the tariff) in maximum rates, rate design, 
balancing provisions, penalties, operational flexibility, or any 
other variation. On the other hand, IPAA stated that the legal 
concept of materiality may depend upon ``where one resides in the 
food chain'' and suggested that all deviating agreements be filed.
    \7\ III FERC Stats. & Regs. para. 31,025 at 31,385.
---------------------------------------------------------------------------

    The Commission will clarify the prior order. To illustrate, a pro 
forma service agreement may contain blanks to be filled in, or ranges 
for terms of service (such as 950-1100 psi). A contract would be 
consistent with the tariff if, for example, it was completed by filling 
in the blanks or included terms that fall within the prescribed ranges. 
There is no need to burden the pipeline with filing all contracts that 
conform to the pro forma agreement that has been filed and approved by 
the Commission as a part of the tariff. Of course, where a contract 
conflicts with the tariff, the tariff controls until the contract is 
filed and accepted by the Commission. Thus, any contract which is not 
consistent with the pro forma service agreement must be filed with the 
Commission. The Commission is continuing to consider in another 
proceeding how much flexibility in contract terms should be permitted. 
On January 31, 1996, the Commission issued a policy statement that it 
is willing to entertain, on a shipper-by-shipper basis, requests to 
implement negotiated rates where customers retain the ability to choose 
a cost-of-service based tariff rate as a recourse.8 In that policy 
statement the Commission established a proceeding in Docket No. RM96-7-
000 to explore how much flexibility could be permitted, although it is 
likely in any event that case-by-case application will be necessary.

    \8\ Statement of Policy and Request for Comments in Docket Nos. 
RM95-6-000, Alternatives to Traditional Cost-of-Service Ratemaking 
for Natural Gas Pipelines; and, RM96-7-000, Regulation of Negotiated 
Transportation Services of Natural Gas Pipelines, 74 FERC para. 
61,076 (1996).
---------------------------------------------------------------------------

b. Section 154.4  Electronic and Paper Media

    New Sec. 154.4 requires electronic media filings in addition to 
paper copies.9 Section 154.4(a) states that a pipeline must file 
information contained in spreadsheet format electronically and continue 
to serve customers with paper copies of filings, but it does not 
require a pipeline to provide such information to its customers in an 
electronic format.

    \9\ Section 154.4 provides, in pertinent part:
    (a) General rule. All statements filed pursuant to subpart D of 
this part, and all workpapers in spreadsheet format, and tariff 
sheets other than those in Volume No. 2, must be submitted on 
electronic media.
---------------------------------------------------------------------------

    APGA requests clarification that a pipeline must, upon request, 
provide such spreadsheet information, including all formulas embedded 
in the spreadsheet, to its customers in an electronic medium. In the 
alternative, APGA requests rehearing of this issue.
    In the Rule, the Commission adopted a tab delimited ASCII format 
for most numeric data and a format compatible with the filing company's 
spreadsheet application for Statements I, J, and those parts of 
Statement H containing state tax calculations.10 To the extent 
APGA's request seeks to expand the use of the format compatible with 
the filing company's spreadsheet application to other statements, the 
request is denied. The Commission adopted the tab delimited format as 
the default for numeric data because it was recommended by several 
parties in comments to the NOPR. It is also a more generic format 
capable of being read or created by several software packages. This 
allows greater access to the data to the general public without 
imposing the burden of buying and learning to use numerous proprietary 
spreadsheet packages. Since statements other than statements I, J, and 
parts of H do not generally contain complex formulae, the loss of the 
formulae will not impair review of the data.

    \10\ III FERC Stats. & Regs. para. 31, 025 at 31,435.
---------------------------------------------------------------------------

    APGA's second request, that the electronic data be available from 
the pipeline if requested, is addressed in section II.i.5 of this 
order.

c. Section 154.5  Rejection of Filings

    Section 154.5 states that filings that fail to comply with part 154 
regulations may be rejected by the Director of the Office of Pipeline 
Regulation (Director) pursuant to the authority delegated to the 
Director in Sec. 375.307(b)(2).11

    \11\ Section 154.5 states:
    A filing that fails to comply with this part may be rejected by 
the Director of the Office of Pipeline Regulation pursuant to the 
authority delegated to the Director in Sec. 375.307(b)(2) of this 
chapter.
---------------------------------------------------------------------------

1. Requests for Rehearing
    INGAA argues that the regulation does not give sufficient guidance 
to the Director as to how to exercise this authority, even if this 
authority has not been changed or augmented by the Rule. INGAA seeks 
clarification that only patently deficient rate case filings can be 
rejected and that Staff would be required to make such a determination 
within 15 days of the filing date. INGAA states that this would give 
applicants and intervenors a level of assurance that a rate case filing 
will proceed on time under the indicated filing date, thus avoiding 
confusion as to when new rates would go into effect. Under INGAA's 
plan, if lesser deficiencies were found, the applicant would have 30 
days to rectify such deficiencies.
    ANR and CIG request that the Commission clarify that so long as 
there is no ``patent failure'' to comply with the Commission's 
requirements, any deficiency may be cured by the pipeline and the 
filing date will be the effective date of the filing.
    ANR and CIG further request that the Commission reconsider the 
decision not 

[[Page 9615]]
to set forth a procedure that would be followed if a filing is deemed 
not in compliance with the Commission's filing requirements. 
Specifically, ANR and CIG suggest that the Commission notify a pipeline 
in writing within 12 days of filing of a rate case of any deficiencies 
in the filing and allow the pipeline ten days to correct the deficiency 
or request a waiver of a filing requirement. ANR and CIG state that 
this procedure would still allow the Commission to act within 30 days 
of the pipeline's filing of the rate case. To the extent there is a 
change or addition to the filing, ANR and CIG suggest that intervenors 
and protestors be permitted to supplement their filings. ANR and CIG 
state that this procedure is consistent with the 12 day period in which 
interested parties may intervene, comment or protest under 
Sec. 154.210.
2. Commission Response
    Section 154.5 merely sets out, in the rate and tariff filing 
requirements, the existing power of the Director to reject tariff or 
rate schedule filings.12 Section 154.5 signals the Commission's 
intent to have the Director reject filings that do not comply with the 
filing requirements promulgated by this order.

    \12\ Section 375.307 delegates to the Director of the Office of 
Pipeline Regulation the authority to reject a tariff or rate 
schedule or filing if it patently fails to comply with applicable 
statutory requirements, and with all applicable Commission rules, 
regulations, and orders for which a waiver has not been granted.
---------------------------------------------------------------------------

    To the extent that the requests for clarification only seek 
assurance that the regulation does not delegate any new power to the 
Director, they are granted. However, any specific guidelines or 
procedures to be followed by the Director in exercising this authority 
must be set out in part 375, not in the pipeline filing requirements.
    The purpose of the regulation is to indicate that the Director's 
power is to reject a filing based on the procedural inadequacy of the 
filing, not the substance. Only the Commission rejects on the basis of 
substance. When a rate filing is procedurally correct but is not 
sufficient to determine just and reasonableness, the appropriate action 
is for the Commission to reject the filing on the merits or to accept 
the filing but suspend the proposed rates pending a hearing. To the 
extent a filing does not include the information required by the 
regulations and is so deficient that it prejudices the Commission in 
the discharge of its duty to decide whether or not to investigate or 
suspend the increased rates, the Commission expects the Director to 
reject the filing.

d. Section 154.7  General Requirements for the Submission of a Tariff 
Filing or Executed Service Agreement

    Section 154.7 is a new section setting forth the content of a 
tariff filing or executed service agreement.13

    \13\ Section 154.7 states, in pertinent part:
    The following must be included with the filing of any tariff, 
executed service agreement, or part thereof, or change thereto.
    (a) A letter of transmittal containing:
    * * * * *
    (6) a statement of the nature, the reasons, and the basis for 
the filing. The statement must include a summary of the changes or 
additions made to the tariff or executed service agreement, as 
appropriate. A detailed explanation of the need for each change or 
addition to the tariff or executed service agreement must be 
included. The natural gas company also must note all relevant 
precedents relied upon to prepare its filing.
    * * * * *
    (9) a motion, in case of minimal suspension, to place the 
proposed rates into effect at the end of the suspension period; or, 
a specific statement that the pipeline reserves its right to file a 
later motion to place the proposed rates into effect at the end of 
the suspension period.
---------------------------------------------------------------------------

1. Transmittal Letter to Contain Quantified Summary
    Section 154.7(a)(6) requires the letter of transmittal to contain a 
statement of the nature, the reasons, and the basis for the filing. The 
statement must include a summary of the changes or additions made to 
the tariff or executed service agreement, as appropriate.
    NGSA believes that the abbreviated form of the filing should 
contain a quantified summary of the proposed changes as well as a 
narrative summary. NGSA states that Sec. 154.7(a)(6) should require a 
table or listing of the cost of service, rate base and throughput 
underlying the proposed rates compared to the same information 
underlying the last rate found by the Commission to be just and 
reasonable. NGSA argues that such information would enable parties to 
readily ascertain the magnitude and the sources of the changes being 
proposed and, thus, negate the need on the part of many parties to 
receive a copy of the full filing. NGSA states that adding this small 
amount of quantified information to the abbreviated filing could reduce 
the number of full filings the pipelines are requested to provide.
    This request for rehearing is granted. The burden to the pipeline 
to provide the additional summary would be minimal. Although NGSA 
suggests that the information could reduce requests for full filings, 
the Commission accepts that, in some cases, the quantification summary 
may engender additional requests for full filings. Nonetheless, 
considering the short time period in which the Commission and 
interested parties have to review the filing, this additional 
information would, in most cases, speed processing and reduce requests 
for additional information or complete filings. The regulations will be 
amended such that a filing under subpart D requires a table or listing 
of the cost of service, rate base and throughput underlying the 
proposed rates compared to the same information underlying the last 
rate found by the Commission to be just and reasonable.
2. Motion to Place Reduced Rates Into Effect
    i. Request for rehearing. Section 154.7(a)(9) requires that the 
transmittal letter contain either a motion, in case of minimal 
suspension, to place the proposed rates into effect at the end of the 
suspension period; or a specific statement that the pipeline reserves 
its right to file a later motion to place the proposed rates into 
effect at the end of the suspension period.
    JMC Power Projects states that the new regulation grants the 
pipeline the option as to when to file a motion to place suspended 
rates into effect--either in its initial letter of transmittal or 
later. JMC Power Projects argues that a pipeline proposing to decrease 
its rates admits that its current rates are unjust and unreasonable and 
has an incentive to delay placing suspended decreased rates into 
effect.
    JMC Power Projects seeks clarification that the motion of the 
pipeline to place suspended rates into effect pursuant to 
Sec. 154.206(b) is the same motion to be filed as part of the 
transmittal letter pursuant to Sec. 154.7(a)(9), and that the pipeline 
must file a motion to place the proposed rates into effect at the end 
of the suspension period. In the alternative, JMC Power Projects seek 
rehearing and requests that the Commission find that when a pipeline 
proposes a rate decrease, either no motion is necessary for the rates 
to go into effect or, if a motion is necessary, the pipeline must file 
a motion to place the suspended rates into effect at the end of the 
minimal suspension period.
    JMC Power Projects states that its interpretation of the new 
regulations to the effect that a pipeline is required to file a motion 
to place reduced rates into effect at the end of the suspension period 
is consistent with past Commission practice. JMC Power Projects states 
that allowing a pipeline to delay placing decreased rates into effect 
beyond the minimal suspension period is unjust and unreasonable, 
particularly when customers in such a situation are not afforded refund 
protection.
    ii. Commission response. JMC Power Projects is correct in stating 
that 

[[Page 9616]]
pipelines have an option to file a motion to place suspended rates into 
effect either in the letter of transmittal or later. Also, the motion 
of the pipeline referred to in Sec. 154.206(b) is the same motion 
referred to in Sec. 154.7(a)(9).
    However, the requested clarification that a pipeline is required to 
file a motion to place reduced rates into effect at the end of the 
suspension period is denied. The request is, in effect, asking for a 
special rule to govern proposed rate decreases. This is unnecessary as 
the revised regulation is consistent with the purposes of the NGA.
    Section 4(e) of the NGA authorizes the Commission to suspend 
operation of a schedule and defer the use of a rate pending a hearing 
``but not for a longer period than five months beyond the time when it 
would otherwise go into effect.'' \14\ If the proceeding has not been 
concluded and an order made at the expiration of the suspension period, 
the proposed change shall go into effect ``on motion of the natural gas 
company making the filing.'' \15\ The Act requires the motion; 
otherwise, the rates do not go into effect.

    \14\ 15 U.S.C. 717c(e).
    \15\ Id.
---------------------------------------------------------------------------

    As a practical matter, where rates have been suspended for a 
minimal period as allowed under the statute, a hearing could not 
possibly be concluded by the expiration of the period.
    The NGA states that refunds may be ordered ``where increased rates 
or charges are thus made effective.'' \16\ Historically, the Commission 
has considered the suspension of a rate as a necessary step to assure 
that refunds may be ordered when appropriate. The refund is appropriate 
where the Commission ultimately determines that the proposed rate moved 
into effect at the end of the suspension period (motion rate) is too 
much of an increase over the last rate found to be just and reasonable 
(the refund floor). Thus, no refund is possible where a decrease is 
proposed. Even where the Commission ultimately finds that the rates 
should have been decreased further than proposed, the motion rate would 
be less than the refund floor.

    \16\ Id.
---------------------------------------------------------------------------

    Usually the Commission accepts a proposed rate decrease without 
suspension. Where the Commission does not suspend the effective date of 
a proposed decrease, a section 4(e) motion is not required and the 
proposed decrease goes into effect on the date proposed by the pipeline 
in its filing. However, it may be appropriate, under certain 
circumstances to suspend a rate decrease and in such instances a motion 
to place the rates into effect would be required; for example, where it 
may not be clear initially if it is a rate decrease due to pancaked 
cases. Thus, the Commission will retain this option. Accordingly, the 
request for clarification that a pipeline is required to file a motion 
to place reduced rates into effect at the end of the suspension period, 
is denied.
3. Effective Date After Minimal Suspension
    ANR and CIG believe that in situations where the suspension period 
is likely to be minimal, pipelines will file the motion to place 
proposed rates into effect with the transmittal letter to ensure that 
the rates will be effective as soon as the suspension period ends. ANR 
and CIG ask whether it was the Commission's intent that, where the 
pipeline had reserved its right to file a later motion, the pipeline 
would lose a day or several days before rates were effective. If so, 
ANR and CIG request clarification and rehearing.
    The request for rehearing is denied. A suspended rate may not go 
into effect prior to the motion of the pipeline. The procedures for 
motioning rates into effect after suspension are the same regardless of 
the length of the suspension period. NGA section 4(e) \17\ requires 
that suspended rates are to go into effect ``on motion'' of the 
pipeline, not before the motion is made. Former Sec. 154.67(a) read 
that the proposed rate ``shall become effective as of the date of 
receipt of such motion by the Commission or the expiration of the 
suspension period, whichever is later.'' Therefore, where the pipeline 
includes a motion in its filing and the proposed rates are suspended 
for a minimal period, the rates will become effective on the date 
proposed. Where the pipeline reserves its right to file a later motion 
and the rates are suspended for a minimal period, the rates will go 
into effect, later, on motion of the pipeline, as is required by the 
NGA.

    \17\ 15 U.S.C. Sec. 717c(e).
---------------------------------------------------------------------------

4. Quarterly List of Tariff Sheets
    In its Initial Comments, AGD recommended a general reporting 
obligation for a pipeline to provide to its customers, quarterly, a 
list of currently effective tariff sheets, whether or not the pipeline 
files any rate increase applications. The Rule states that AGD's 
suggested summary appears in Sec. 154.7 and thus, what AGD seeks is 
already required. AGD maintains on rehearing that its recommendation 
has not been satisfied by the indicated regulation nor by any other 
part of Order No. 582.
    Many pipelines voluntarily provide their customers with such a 
list. However, the Commission declines to burden all pipelines with 
this obligation. Customers may keep abreast of developments affecting 
pipeline services by monitoring the ``summary of changes or additions 
made to a tariff'' required by Sec. 154.7(a)(6) when a pipeline files 
for a change. Further, this information is available to the public on 
the Commission's bulletin board system by accessing the FERC Automated 
System for Tariff Retrieval (FASTR).

e. Section 154.101  Form

    Williston Basin points out that Sec. 154.101 contains a 
typographical error. As written, it requires that the paper copy of a 
tariff sheet be reproduced on 8\1/2\ by 11 inch sheets of paper with 
margins of \1/4\ inches on the top, bottom, and left sides, and a 
margin of \1/2\ inch on the right side. The NOPR stated that there is 
to be a 1 and \1/4\ inch margin on the left side of the sheet.
    Williston Basin is correct. The regulation has been modified to 
require that the margins on the top, left, and bottom of the tariff 
sheet must be 1\1/4\ inches.

f. Section 154.107  Currently Effective Rates

    New Sec. 154.107 governs the tariff sheets setting forth the 
natural gas company's currently effective rates. Section 154.107(b) 
requires that all rates be stated in thermal units.\18\

    \18\ Section 154.107(b) provides that ``[a]ll rates must be 
stated clearly in cents or dollars and cents per thermal unit. The 
unit of measure must be stated for each component of a rate.''
---------------------------------------------------------------------------

1. Requests for Rehearing
    Great Lakes requests clarification or rehearing on the grounds that 
sufficient time is needed to permit pipelines to identify and resolve 
the issues related to conversion to thermal units, and to modify 
existing contractual and tariff provisions where the current 
arrangements are in volumetric units. Great Lakes states that the 
contractual changes necessary to fully convert to thermal rates may 
result in a reallocation of costs to effectuate the change in rates.
    Great Lakes requests clarification that conversion to thermal units 
can be implemented through a compliance filing made under Sec. 154.203; 
and, that any rates restated in thermal units can utilize the cost of 
service and billing units (converted to dekatherms) underlying the 
filing pipeline's currently effective rates.
    Chevron, USA Inc., and Shell Western E&P Inc. (Designated Shippers) 
argue 

[[Page 9617]]
that to require a change in these rates, the Commission must find 
substantial evidence that stating rates on an Mcf basis is no longer a 
just and reasonable practice.\19\

    \19\Designated Shippers cite to Mobil Oil Corp. v. FPC, 483 F.2d 
1238 (D.C. Cir. 1973).
---------------------------------------------------------------------------

    The Rule states that the Commission ``does not intend to actively 
enforce this section until one year after the effective date of this 
rule.'' \20\ Designated Shippers maintain that this delay in 
enforcement does not adequately address the hardships faced by these 
shippers or give the affected parties a forum to address the 
significant factual determinations that will have to be made in 
converting rates and capacity entitlements from Mcf units to a thermal 
basis. Designated Shippers state that these determinations are all the 
more critical on pipelines where the heating value of the gas varies 
widely from receipt point to receipt point, and where contract 
capacity, denominated in Mcf units, will have to be converted. 
Designated Shippers argue that the proper forum for determining these 
facts is an individual pipeline rate case.

    \20\ III FERC Stats. & Regs. para. 31,025 at 31,392.
---------------------------------------------------------------------------

    If the Commission does not grant rehearing, Designated Shippers 
request clarification that implementing Order No. 582 will not require 
an effective rate increase for any individual shipper or result in the 
infringement of any shipper's contract rights. Designated Shippers 
state that if a conversion is made at the average Btu factor being 
shipped through the pipeline, some shippers will benefit, and other 
shippers will be harmed.
2. Commission Response
    The Commission is committed to standardization of business 
practices in the natural gas industry. Most recently, the Commission 
underscored that commitment in its advance notice of proposed 
rulemaking for standards for business practices of interstate natural 
gas pipelines:

    As a result of restructuring, the gas industry is becoming a 
national marketplace. In order to establish a more efficient and 
seamless pipeline grid, where buyers can easily and efficiently 
obtain and transport gas from all potential sources of supply, the 
development of standardized methods of conducting business along 
with standardized methods of communication is critical. Without 
common business practices and a common language for communication, 
the speed and efficiency with which shippers can transact business 
across multiple pipelines is now, and will continue to be, severely 
compromised. The industry must expeditiously complete 
standardization of crucial business practices to make the promise of 
a restructured and integrated pipeline grid a reality. Accordingly, 
the Commission intends to establish, by rule, standards governing 
pipelines' conduct of crucial business practices and the electronic 
means by which pipelines will exchange information with their 
customers and third-parties.\21\

    \21\ 73 FERC para. 61,104 (1995).

    At a conference held on September 21, 1995, to examine the 
industry's progress towards standardization, one participant pointed 
out the failure of the industry to decide on whether to require 
nominations to be reported in Mcf or MMBtu as an example of the lack of 
standardization in the industry.\22\ The Commission's adoption of the 
provision at Sec. 154.107 requiring rates to be stated in MMBtu or Dth 
is an outgrowth of its conviction that standardized business practices 
are essential to an integrated national pipeline grid.

    \22\ Id. at 61,323.
---------------------------------------------------------------------------

    Further, staff reviewed the tariffs of 11 pipelines which state 
rates exclusively on the basis of Mcf. All but three assure redelivery 
of thermally equivalent volumes. In other words, the pipeline 
redelivers a sufficient volume (in Mcf) to ensure the natural gas 
delivered contains the same heating value as the natural gas received. 
In this case, there is no guarantee that the volume (in Mcf) delivered 
will exactly equal the volume (in Mcf) received. The requirement that 
natural gas be redelivered in thermally equivalent volumes underscores 
the nature of the commodity being traded. Natural gas is of worth 
because of its heating content. The true commodity is the heating value 
of the natural gas. Rates should be reflective of the true commodity 
traded.
    Stating rates in MMBtu or Dth as opposed to Mcf could cause some 
shippers to pay higher rates, but any such proposed rate changes will 
not be made without Commission review to ensure they are just and 
reasonable. All pipelines making the switch must file appropriate 
revisions to their tariffs. At that time, parties can raise their 
concerns about paying higher rates as a result of conversion to thermal 
units. All such concerns will be addressed when the Commission 
determines whether the proposed rates are just and reasonable. All 
issues regarding implementation of Sec. 154.107(b) can be addressed in 
the individual proceeding to effectuate the new thermal rates. 
Therefore, the Commission will not grant rehearing.
    We grant Great Lakes' request for clarification that a pipeline may 
file to state its rates on a thermal basis under Sec. 154.107 without 
filing a major rate case filing under subpart D.\23\

    \23\ Trailblazer Pipeline Company and Canyon Creek Compression 
Company have filed to restate their rates on a thermal basis in 
compliance with Order No. 582. Neither did so in a general rate 
proceeding.
---------------------------------------------------------------------------

g. Section 154.109  General Terms and Conditions

    Section 154.109 requires that a pipeline set forth in its tariff 
its discount policy and the order in which each pipeline charge will be 
discounted.\24\ The Rule stated that Sec. 154.109(c) merely formalizes 
the Commission's policy on recognition of discounts as enunciated in 
Natural.\25\

    \24\ Section 154.109(c) provides:
    The general terms and conditions of the tariff must contain a 
statement of the order in which the company discounts its rates and 
charges. The statement, specifying the order in which each rate 
component will be discounted, must be in accordance with Commission 
policy.
    \25\ III FERC Stats. & Regs. para. 31,025 at 31,394 (citing 
Natural Gas Pipeline Company of America (Natural), 69 FERC para. 
61,029, (1994), reh'g, 70 FERC para. 61,317 (1995)). Under the 
policy, ``[t]he first item of the overall reservation charge 
discounted will be the GRI surcharge (for member pipelines), 
followed by the base rate reservation charge, Account No. 858 or 
other transition cost surcharges, and last, all GSR reservation 
surcharges. Other non-transition reservation surcharges will be 
attributed as agreed by the pipeline and its customers in individual 
proceedings.'' 69 FERC at 61,117 n.23.
---------------------------------------------------------------------------

    PEC seeks clarification that the decision in Natural left 
individual pipelines free to argue, based on their individual facts and 
circumstances, that the order of discounting in Natural did not apply. 
INGAA seeks clarification, or in the alternative rehearing, that this 
provision does not apply to existing tariff provisions that provide for 
a permanent discount mechanism negotiated between parties in a previous 
regulatory proceeding. The Commission clarifies that if a pipeline's 
tariff contains an existing provision governing the order of discounts, 
accepted by the Commission, no modification to the tariff provision is 
required under Sec. 154.109. The Commission further clarifies that a 
pipeline, in a filing to comply with this section, may attempt to show 
that an order of discounting other than that set forth in Natural 
should apply.

h. Section 154.206  Motion to Place Suspended Rates Into Effect

1. Effective Date Where Modifications are Ordered
    Section 154.206(a) requires that, when rates have been suspended 
for more than a minimal period and the Commission has ordered changes 
or the rates include costs of facilities that are not in service, the 
motion to place suspended tariff sheets into effect must 

[[Page 9618]]
be filed at least one day prior to the date the sheets are to take 
effect.\26\

    \26\ Section 154.206 states, in pertinent part:
    Sec. 154.206 Motion to place suspended rates into effect
    (a) If, prior to the end of the suspension period, the 
Commission has issued an order requiring changes in the filed rates, 
or the filed rates recover costs for facilities not certificated and 
in service as of the proposed effective date, in order to place the 
suspended rates into effect, the pipeline must file a motion at 
least one day prior to the effective date requested by the pipeline. 
The motion must be accompanied by revised tariff sheets reflecting 
any changes ordered by the Commission or modifications approved by 
the Commission during the suspension period under Sec. 154.205. The 
filing of the revised tariff sheets must:
    (1) comply with the requirements of subparts A, B, and C of this 
part;
    (2) identify the Commission order directing the revision;
    (3) list the modifications made to the currently effective rate 
during the suspension period, the docket number in which the 
modifications were filed, and identify the order permitting the 
modifications.
    (b) Where the Commission has suspended the effective date of a 
change of rate, charge, classification, or service for a minimal 
period and the pipeline has not included a motion in its transmittal 
letter, or has specified in its transmittal letter pursuant to 
Sec. 154.7(a)(9), that it reserves its right to file motion to place 
the proposed change of rate, charge, classification, or service into 
effect at the end of the suspension period, the change will go into 
effect, subject to refund, upon motion of the pipeline.
    (c) Where the Commission has suspended the effective date of a 
change of rate, charge, classification, or service for a minimal 
period and the pipeline has included, in its transmittal letter 
pursuant to Sec. 154.7(a)(9), a motion to place the proposed change 
of rate, charge, classification, or service into effect at the end 
of the suspension period, the change will go into effect, subject to 
refund, on the authorized effective date.
---------------------------------------------------------------------------

    i. Requests for rehearing. AGD is concerned that the regulations do 
not adequately assure pipeline compliance with whatever conditions or 
requirements for changes in rates that may have been imposed by the 
Commission's suspension order. AGD recommends that, in situations where 
the Commission has required changes in the filed rates, a minimum 
period of 14 days be fixed as the time between the filing of a motion 
to place rates in effect and the proposed effective date. AGD also 
recommends that the provision recommended in its Initial Comments be 
added to Section 154.206(a). \27\

    \27\ That proviso states:
    Provided, however, that no rates will be made effective pursuant 
to motion until after the party proposing a rate change has 
satisfied all conditions imposed by the Commission with regard to 
the contents of the rate increase filing.
---------------------------------------------------------------------------

    AGD points out that the preamble to the Rule states that 
``individual suspension orders may require pipelines to make compliance 
filings earlier, to reflect changes required by the Commission.'' \28\ 
However, AGD states that this language is not a satisfactory answer to 
the problem because the regulations governing the time of motions 
placing rates in effect provides only 24 hours within which the 
pipeline's compliance with the Commission's required changes in its 
rate filing can be determined. AGD states that there is no assurance 
that, in individual cases, sufficient time will be provided to 
ascertain that the pipeline's compliance with Commission-mandated 
changes in its rates has occurred. AGD states that there is no 
regulatory bar to the pipeline's ability to place in effect, after the 
suspension period, rates which do not comply with the changes mandated 
by the Commission's suspension order.

    \28\ III FERC Stats. & Regs. para. 31,025 at 31,400.
---------------------------------------------------------------------------

    ii. Commission response. The NOPR had proposed that when rates have 
been suspended for more than a minimal period and the Commission has 
ordered changes or the rates include costs of facilities that are not 
in service, the motion to place suspended tariff sheets into effect 
must be filed no less than 30 days nor more than 60 days prior to the 
date the sheets would take effect. AGD's Initial Comments had proposed 
that in addition to the 30-60 day opportunity to ascertain whether 
pipeline compliance with any Commission-ordered changes in its rates 
had occurred, that the regulations also include a provision which 
negated the pipeline's ability to place into effect any suspended rates 
which did not reflect changes the Commission had ordered. Columbia 
commented that the proposed requirement would cause pipelines to 
estimate test period data for that portion of the test period occurring 
after the date the pipeline must make the motion rate filing.
    CNG and Columbia recommended no change to the practice of allowing 
pipelines to file motion rates one day before the effective date. CNG 
commented that the proposed rule would require pipelines to rely on 
estimated plant balances in determining the level of plant in service 
at the end of the test period. Further, CNG stated, the pipeline would 
be unable to determine the status of negotiations 30 days in the 
future, and would be compelled to move to make the rate increase 
effective at the earliest possible date. In light of these comments to 
the NOPR, the revised regulation was modified to continue the current 
practice of allowing pipelines to file motion rates one day before the 
effective date.
    The modifications requested by AGD are denied. AGD is incorrect in 
stating the there is no ``regulatory bar'' to the pipeline's ability to 
place in effect, after the suspension period, rates which do not comply 
with the changes mandated by the Commission's suspension order. 
Pursuant to Sec. 154.206, the motion must be accompanied by revised 
tariff sheets reflecting any changes ordered by the Commission. A 
motion that does not reflect the ordered changes would be in violation 
of the Commission order and the subject rates would be unlawful.
2. Withdrawal After Minimal Suspension
    Section 154.206(c) provides that where the rate is suspended for a 
minimal period and the pipeline has included in its transmittal letter 
pursuant to Sec. 154.7(a)(9), a motion to place the proposed rate into 
effect at the end of the suspension period, the change will go into 
effect, subject to refund, on the authorized effective date.
    ANR and CIG seek clarification that if the pipeline includes a 
motion with the transmittal letter, and the Commission accepts the 
filing but requires changes to the pipeline's proposal, the pipeline 
will still have the option of withdrawing its motion before the rates, 
with the Commission modifications, go into effect.
    This clarification is denied. As discussed above, the pipeline may 
choose to reserve its right to file a later motion and rates, suspended 
for a minimal period, will go into effect, later, on motion of the 
pipeline. Where the pipeline chooses to include a motion in its filing 
and the proposed rates are suspended for a minimal period, the rates 
will become effective on the date proposed. However, the pipeline may 
condition its motion on the Commission's accepting the proposed filing 
without modification.
    i. Section 154.208  Service on Customers and Other Parties. New 
Sec. 154.208 formally requires the filing company to serve its 
customers and state regulatory commissions on or before the filing 
date. The regulation requires that all customers and state commissions 
receive an abbreviated form of the filing.\29\ Customers and state 

[[Page 9619]]
commissions with an interest may then request a full copy. The pipeline 
must serve the full copy within 48 hours. However, pipelines must 
comply with any customer's standing request to receive a complete 
filing as the initial served filing. Customers are defined as customers 
of the pipeline with a contract for service as of the date of the rate 
case filing.\30\

    \29\ Section 154.208  Service on customers and other parties.
    (a) On or before the filing date, the company must serve, upon 
all customers as of the date of the filing and all affected state 
regulatory commissions, an abbreviated form of the filing consisting 
of: the Letter of Transmittal; the Statement of Nature, Reason, and 
Basis; the changed tariff sheets; a summary of the cost-of-service 
and rate base; and, summary of the magnitude of the change.
    (b) On or before the filing date, the company must serve a full 
copy of the filing upon all customers and state regulatory 
commissions that have made a standing request for such service.
    (c) Within 48 hours of receiving a request for a complete copy 
from any customer or state commission that has not made a standing 
request, the company must serve a full copy of any filing.
    \30\ III FERC Stats. & Regs. para. 31,025 at 31,403.
---------------------------------------------------------------------------

2. Service Group
    NGSA asks the Commission to include ``economically impacted 
parties'' as part of Sec. 154.208. NGSA states that some gas producers 
effect title transfer of their gas either at the wellhead or at the 
outlet of a non-jurisdictional gas gathering system. NGSA states that 
because gas producer prices and wellhead operations are affected by the 
rates, terms and conditions of the pipeline's tariff, they should enjoy 
the full rights of any other potential intervenor to a rate case, 
including the expeditious receipt of the pipeline's rate case 
documents. NGSA states that ``economically impacted parties'' includes 
those purchasers of short-term released capacity who may not have ``a 
contract for service as of the date of the rate case filing.'' NGSA 
states that economically impacted parties should not be excluded from 
receiving the pipeline's rate case filing or because the timing of the 
rate case does not coincide with the timeframe specified within a 
contract.
    America Forest and Paper Associates (AF&PA) requests that on 
rehearing the Commission revise Sec. 154.208 to provide that, in 
addition to customers and affected state commissions, the pipelines 
must serve tariff filings on interested parties, such as trade 
associations and customer groups, and their representatives. AF&PA 
argues that trade associations and customer groups play an important 
role in proceedings before the Commission and enable the Commission to 
conduct an efficient decision-making process by allowing it to consider 
the views of many interested parties channeled through one source.
    On the other hand, Columbia states that the requirement to serve 
even the abbreviated copy upon all customers is unduly burdensome. To 
illustrate, Columbia states that, Columbia Transmission, in addition to 
its firm customers, presently serves 300 interruptible transportation 
customers, and Columbia Gulf serves 200 interruptible customers. 
Columbia continues to believe that the Rule should be modified to 
require service only upon firm customers and affected state commissions 
on the filing date. Columbia states that service effected in this 
manner, along with the form of notice pursuant to Sec. 154.209, is 
sufficient to assure adequate notice.
    The requests for rehearing are denied. In light of the responses to 
the NOPR, the revised regulation is a combination of the alternatives 
suggested by several commenters and represents a reasonable middle 
ground between requiring service of a complete filing and service of 
just the transmittal letter. While reducing the filing burden to the 
pipeline, this course assures that all current customers and state 
regulatory commissions receive complete notice adequate to making 
informed decisions about the proposal. Adding or deleting recipients to 
the required service list would upset the balance achieved by the 
regulation.
3. ``Served'' or ``Received''
    NGSA requests that the Commission clarify or modify Sec. 154.208(c) 
so that pipelines are required to send the full rate case filing to a 
requestor such that it is received within 48 hours of their request. 
APGA and NGSA state that Sec. 154.208(c) permits the pipelines to 
engage regular U.S. postal services 48 hours after the request had been 
made and receive the full filing two or three days after it is 
postmarked. APGA and NGSA believe that the existence of overnight 
express delivery services makes it possible for parties to receive a 
full filing within 48 hours of their request.
    The request for rehearing is denied. Rule 2010 governing the timing 
of service states that service is made when the document is deposited 
in the mail or delivered in another manner.\31\ The increased burden of 
requiring pipelines to ensure delivery within 48 hours is out of 
balance to the potential benefit to parties receiving the documents 
earlier. However, while not required, parties may agree to arrange for 
overnight delivery. It would be reasonable to expect the recipient to 
bear the cost of this additional service.

    \31\ 18 CFR 385.2010.
---------------------------------------------------------------------------

4. Service Recipient
    APGA states that it is the customer's representative or agent, 
i.e., attorney or consultant, who has the most urgent need to review a 
complete copy of the filing in order to have time to prepare a motion 
to intervene, protest or comments within the deadline provided by the 
Rule for the filing of such pleadings. APGA requests that the 
Commission clarify that a customer may designate a representative or 
agent also to receive service of a complete copy of a rate filing on or 
before the filing date. In the alternative, APGA requests rehearing of 
this issue.
    The request is granted in part. In past practice, a party could 
designate a recipient at the time it files an intervention or when the 
service list is created at hearing. Now that the filing company must 
serve its customers on or before the filing date, there must be a 
procedure for designating service recipients at the earlier time. The 
regulation will be revised to provide that a customer may designate a 
representative or agent to receive service on or before the filing date 
as suggested by APGA. The filing company is required to serve only one 
copy per customer, not multiple copies. However, while not required, 
parties may agree to arrange for multiple recipients or copies. It 
would be reasonable to expect the recipient to bear the cost of this 
additional service.
5. 48 Hours
    Columbia Gas Transmission Corporation and Columbia Gulf 
Transmission Company (Columbia) and INGAA request clarification that 
the parties may interpret Sec. 154.208(c), requiring action within 48 
hours, to mean two business days, thereby removing the concern that 
responsive action need not be taken on holidays or weekends.
    Columbia's concern is unnecessary. Rule 2007 provides that ``any 
period of time'' prescribed by a Commission rule is computed to exclude 
the day of the act or event from which the time period begins. Further, 
the last day of the time period is not included if it is a weekend or 
holiday, in which case the period ends at the close of business on the 
next day that is not a weekend or holiday.\32\ Nonetheless, to avoid 
any confusion the regulations will be revised to state that the 
pipeline must respond to such requests within two business days.

    \32\ 18 CFR 385.2007(a).
---------------------------------------------------------------------------

6. Electronic Version
    NGC argues that the Commission erred by failing to require 
interstate pipelines to provide shippers with an electronic version of 
their filing. NGC states that the provision does not require pipelines 
to honor a customer's request to receive a copy of the filing in 
electronic format.
    NGC states that rather than forcing customers to wait until the 
tariff data is entered into the Commission's FASTR system, which can 
take weeks, customers should have instant access to the full filing, 
through the acquisition of 

[[Page 9620]]
the data in a standardized electronic format directly from the 
applicant. NGC states that since the pipelines are already required to 
file electronically, there will be little added burden or cost to 
making electronic versions of their filings available.
    Under Secs. 154.4 and 154.209 of the regulations, pipelines must 
file the form of notice, tariff sheets, and statements and workpapers 
required by subpart D of the regulations electronically. In Order No. 
582, the Commission recognized that both the electronic and paper 
versions of the filing represent the official filing.\33\ Parties 
receiving service under Sec. 154.208 have a right to receive all or 
part of the official filing depending on their election. Since the 
electronic portion of the filing is part of the official filing, 
service would include the pertinent parts of the electronic version of 
the filing. However, in recognition that not all parties would be 
interested in receiving the electronic portion of the filing, a party 
may ask not to receive the electronic portion of the filing, if that is 
its wish.

    \33\ III FERC Stats. and Regs., para. 31,025 at 31,437.
---------------------------------------------------------------------------

j. Section 154.210  Protests, Interventions, and Comments

    Section 154.210 states that interventions, comments, and protests 
must be filed within 12 calendar days of the filing date and comments 
must be filed at the same time as interventions and protests.\34\

    \34\ Section 154.210  Protests, interventions, and comments
    (a) Unless the notice issued by the Commission provides 
otherwise, any protest, intervention or comment to a tariff filing 
made pursuant to this part must be filed in accordance with 
Sec. 385.211 of this chapter, not later than 12 days after the 
subject tariff filing. A protest must state the basis for the 
objection. A protest will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve 
to make the protestant a party to the proceeding. A person wishing 
to become a party to the proceeding must file a motion to intervene.
    (b) Any motion to intervene must be filed not later than 12 days 
after the subject tariff filing in accordance with Sec. 385.214 of 
this chapter.
---------------------------------------------------------------------------

    APGA seeks rehearing on this issue and reiterates its request that 
parties be allowed a minimum of 15 days to file interventions.
    The NOPR had proposed that the interventions, comments, and 
protests be filed within ``10 days'' of the filing. Many commenters 
objected to changing from the ``former 15-day'' time period and 
numerous alternatives were suggested for comment periods ranging from 
10 to 30 days. The Commission has balanced the need to allow sufficient 
time for interested parties to review a filing with the need for the 
proceeding to progress swiftly. The use of the 12 calendar day standard 
achieves this balance. The request for rehearing is denied.

k. Section 154.301  Changes in Rates

    PEC Pipelines request clarification as to what items are considered 
``rate fixing adjustments'' and which are not.\35\ PEC Pipelines 
requests clarification that cost-of-service items, contract demand 
levels, and throughput are not ``rate fixing adjustments,'' for 
purposes of this requirement. PEC Pipelines state that the mere fact 
that an element of cost-of-service--such as labor costs--has increased 
is not the type of ``rate fixing adjustment'' that should trigger an 
additional workpaper requirement. PEC Pipelines state that the same is 
true with respect to contract demand levels and throughput. PEC 
Pipelines state that the level of O&M expenses and throughput are 
already covered by the schedules set forth under Sec. 154.312, 
Composition of Statements. On the other hand, PEC Pipelines state, 
certain items do affect the setting of the unit rate, such as cost 
allocation and rate design; logically, these items are those that 
should be considered ``rate fixing adjustments'' as addressed in 
Sec. 154.301(c).

    \35\ Section 154.301 (c) provides:
    A natural gas company filing for a change in rates or charges 
must be prepared to go forward at a hearing and sustain, solely on 
the material submitted with its filing, the burden of proving that 
the proposed changes are just and reasonable. The filing and 
supporting workpapers must be of such composition, scope, and format 
as to comprise the company's complete case-in-chief in the event 
that the change is suspended and the matter is set for hearing. If 
the rate fixing adjustments presented are not in full accord with 
any prior Commission decision directly involving the filing company, 
the company must include in its working papers alternate material 
reflecting the effect of such prior decision. (For purposes of this 
section, rate of return is not a rate fixing adjustment.)
---------------------------------------------------------------------------

    In response to PEC Pipelines' concern the Commission will revise 
this section by substituting the term ``change in rates or charges'' 
for ``rate fixing adjustments.'' This change is more in line with the 
current terminology where parties no longer refer to ``fixing'' a rate 
but ``making'' a rate change. The Commission agrees with PEC Pipelines 
that the mere fact that an element of the cost-of-service has increased 
does not trigger an additional workpaper requirement. Pipelines need to 
file alternate material when they are proposing a ratemaking change 
that is inconsistent with a prior Commission decision directly 
involving the filing company. Further, as the Commission does not 
require that a specific rate of return must be used in subsequent 
filings, the parenthetical language is removed because it is not 
necessary and may cause confusion.

l. Section 154.303  Test Periods.

    Although Sec. 154.303 is a complete redraft of former 
Sec. 154.63(e)(2) (i) and (ii), the revised regulation maintains the 
same time scheme for the test period.36 The test period consists 
of a base period followed by an adjustment period. The base period 
consists of 12 consecutive months of the most recently available actual 
experience. The last day of the base period may not be more than four 
months prior to the filing date. The adjustment period is a period of 
up to nine months immediately following the base period.

    \36\ Section 154.303  Test periods.
    Statements A through M, O, P, and supporting schedules, in 
Sec. 154.312 and Sec. 154.313, must be based upon a test period.
    (a) If the natural gas company has been in operation for 12 
months on the filing date, then the test period consists of a base 
period followed by an adjustment period.
    (1) The base period consists of 12 consecutive months of the 
most recently available actual experience. The last day of the base 
period may not be more than 4 months prior to the filing date.
    (2) The adjustment period is a period of up to 9 months 
immediately following the base period.
    (3) The test period may not extend more than 9 months beyond the 
filing date.
    (4) The rate factors (volumes, costs, and billing determinants) 
established during the base period may be adjusted for changes in 
revenues and costs which are known and measurable with reasonable 
accuracy at the time of the filing and which will become effective 
within the adjustment period. The base period factors must be 
adjusted to eliminate nonrecurring items. The company may adjust its 
base period factors to normalize items eliminated as nonrecurring.
    (b) If the natural gas company has not been in operation for 12 
months on the filing date, then the test period must consist of 12 
consecutive months ending not more than one year after the filing 
date. Rate factors may be adjusted as in paragraph (a)(4) of this 
section but must not be adjusted for occurrences anticipated after 
the 12-month period.
    (c)(1) Adjustments to base period experience, or to estimates 
where 12 months' experience is not available, may include the costs 
for facilities for which either a permanent or temporary certificate 
has been granted, provided such facilities will be in service within 
the test period; or a certificate application is pending. The filing 
must identify facilities, related costs and the docket number of 
each such outstanding certificate. Subject to paragraph (c)(2) of 
this section, adjustments to base period experience, or to estimates 
where 12 months' experience is not available, may include any 
amounts for facilities that require a certificate of public 
convenience and necessity, where a certificate has not been issued 
by the filing date but is expected to be issued before the end of 
the test period. Adjustments to base period may include costs for 
facilities that do not require a certificate and are in service by 
the end of the test period.
    (2) When a pipeline files a motion to place the rates into 
effect, the filing must be revised to exclude the costs associated 
with any facilities not in service as of the earlier of the 
effective date or the end of the test period.
    (d) The Commission may allow reasonable deviation from the 
prescribed test period.
---------------------------------------------------------------------------

    Section 154.303 clarifies that the pipeline must remove from rates 
moved 

[[Page 9621]]
into effect the cost of any facilities not certificated (where a 
certificate is required) and in service as of the end of the test 
period.
1. Base Period
    MRT and Williston Basin request that the Commission grant rehearing 
and amend Sec. 154.303(a)(1) to lengthen the time from the last day of 
the base period to the filing date from four months to five months. MRT 
states that no pipeline would need to wait the full five months to 
file, but for pipelines with small staffs, like MRT, an additional 
month would greatly facilitate the timely filing of a high-quality 
initial filing and Statement P. Williston Basin argues that no 
justification has been given in Order No. 582 for reducing the already 
limited amount of time which a pipeline has to prepare its rate 
filings.
    These requests, in effect, seek to set the test period back one 
month. This the Commission is reluctant to do. The regulations are 
constructed so that the rate paid by a customer is based upon 
representative costs recently incurred by the pipeline for providing 
the services to that customer. The regulations continue to set the 
cutoff date for these representative costs at four months before the 
filing. MRT and Williston Basin have not shown that this period is 
unreasonable.
2. Costs of Facilities for Which a Certificate Application is Pending
    i. Requests for rehearing. Williston Basin seeks rehearing of the 
requirements of Sec. 154.303(c). Section 154.303(c)(1) permits a 
pipeline to include, in adjustments to the base period, costs of 
facilities for which a certificate application is pending. Section 
154.303(c)(2) requires that when a pipeline files a motion to place the 
proposed rates into effect, the tariff filing must be revised to 
exclude the costs associated with any facilities not in service as of 
the earlier of the effective date or the end of the test period.
    Williston Basin states that there is a problem where a pipeline 
files its motion to put its proposed rates into effect before the end 
of the adjustment period. In those circumstances, Williston Basin 
argues, the pipeline should be permitted to include the cost of the 
facilities estimated to be in service at the end of the adjustment 
period, subject to true-up when the actual costs are known.
    Williston Basin states that if the Commission suspends the proposed 
rates for one day but the adjustment period does not end for another 
five months, the pipeline would not be able to include the costs of 
facilities under construction for any of that five-month period even if 
the facilities are in service by the end of the adjustment period. 
Likewise, Williston Basin states, if the rates are suspended until the 
end of the adjustment period, the pipeline's motion filing would still 
be made before the end of the adjustment period and the exact costs of 
the facilities would not be known on the day the motion is made.
    PEC states that the Commission should clarify that it did not 
intend to depart from past practice in promulgating Sec. 154.303 and 
except from its Sec. 154.303(c)(2) requirement costs associated with 
routine facility construction. PEC states that the clarified regulation 
would read as follows:

    When a pipeline files a motion to place rates into effect, the 
filing must be revised to exclude the costs associated with any 
facilities for which specific certificate authorization is required 
but is not expected to be granted or not in service by the end of 
the test period.

    PEC states that the Commission should also clarify that costs 
through the end of the test period (not the earlier of the effective 
date or the end of the test period as stated in Order No. 582) may be 
included in rates. PEC states that if the Commission does not so 
clarify its regulations, the end of test period analysis will be skewed 
because not all of the costs of facilities at the end of the test 
period will be included, leading to mismatches in elements of cost of 
service. PEC argues that costs applicable to new facilities could be 
excluded on grounds that the facilities were not in service on an 
effective date occurring earlier than the end of the test period, even 
though volumes applicable to transportation through the facilities 
would be reflected in rates if the deliveries commenced prior to the 
end of the test period. PEC states that the basic objective of 
synchronizing all rate elements at the end of the test period will be 
thwarted. PEC states that the proposed revised Sec. 154.303(c)(2) would 
correct this inconsistency.
    ii. Commission response. These requests are granted. The regulation 
will be revised to return to the previous practice. Typically, at the 
end of the suspension period, the pipeline files a motion to place the 
proposed rates, as adjusted for any Commission determinations, into 
effect. The requirement that the motion rates not include costs through 
the end of the test period, when the effective date is earlier, negates 
the ability, otherwise provided by the regulations, to adjust for 
changes in revenues and costs which are known and measurable with 
reasonable accuracy at the time of the filing and which will become 
effective within the adjustment period. Accordingly, the regulation 
will be changed to allow a pipeline to file a motion to place rates 
into effect that include costs associated with facilities not in 
service as of the effective date subject to removal of such costs where 
the facilities are not in service by the end of the test period.

m. Section 154.304  Format of Statements, Schedules, Workpapers, and 
Supporting Data

    Section 154.304 requires a narrative explanation of each proposed 
adjustment to base period actual volumes and costs.37 The Rule 
indicated the Commission's intention to adopt two of NGSA's 
suggestions; 38 however, these changes did not appear in the 
regulatory text. The Commission is amending Secs. 154.304 and 154.311 
to reflect NGSA's suggestions that narrative explanations be placed at 
the beginning of the specific statements to which they apply and that 
statement updates be provided to parties specifically requesting them.

    \37\ Section 154.304(b) provides:
    The data in support of the proposed rate change must include the 
required particulars of book data, adjustments, and other 
computations and information on which the company relies, including 
a detailed narrative explanation of each proposed adjustment to base 
period actual volumes and costs.
    \38\ III FERC Stats. & Regs. para. 31,025 at 31,405.
---------------------------------------------------------------------------

n. Section 154.305  Tax Normalization

    Section 154.305 requires pipelines to use tax normalization to 
compute the income tax component of the cost-of-service and to adjust 
rate base by accumulated deferred income taxes related to components of 
the cost-of-service.
    On rehearing, APGA requests that the Commission promulgate 
amendments to its regulations to curtail the practice whereby pipelines 
eliminate or reduce their accumulated deferred income tax (ADIT) 
account balance, which is typically deducted from rate base, and 
correspondingly increase their rate base and hence their return, when a 
pipeline undergoes a merger.
    The request for rehearing is denied. Because the request concerns a 
ratemaking policy, it is beyond the scope of this rulemaking.

o. Section 154.311  Updating of Statements

    Certain Statements and Schedules must be updated, once, 45 days 
after the end of the test period. 

[[Page 9622]]

    INGAA requests clarification that the Commission did not intend 
nine 12-month running totals but rather intended a monthly total for 
each month in the nine-month period with a single set of updates 
encompassing a 12-month period. Second, INGAA states that the 45-day 
update requirement is insufficient time for this much data to be 
assembled since the books will not close until at least 10-15 days past 
the end of the test period. INGAA requests clarification that a period 
of 75 days be given for such updates. Third, INGAA urges the Commission 
to authorize the Director of OPR and presiding ALJ to suspend or 
terminate the update requirements if a settlement is pending approval, 
hearings have been complete
FR Doc. 96-5165 Filing and Reporting Requirements for Interstate Natural Gas Company Rate Schedules and Tariffs Final Rule; Order on Rehearing
d, or an ALJ's decision is pending. INGAA 
states that updates in these situations would serve no purpose.
    The Commission did not intend that updates would have nine 
different 12-month running totals for each month since updates would be 
filed 45 days after the end of the test period. Also, updates must 
include a monthly total for each month in the nine-month period with a 
single set of updates encompassing a 12-month period. INGAA's request 
for clarification on this issue is granted.
    INGAA's suggestion of 75 days in lieu of 45 days will not be 
adopted. The Commission staff works expeditiously to complete the 
review of a pipeline's rate filing and prepare the preliminary staff 
position, testimony and exhibits. Companies have access to the data for 
updates within 10 to 15 days of closing and thus could file within the 
45 day period seemingly without undue hardship. Thus, adding 30 
additional days to the process would merely delay the case without a 
corresponding benefit.
    We agree with INGAA's reasoning on the suspension of updates. The 
Secretary has the authority to grant extensions of time. The 
regulations will be revised to recognize the Secretary's authority to 
extend the time for the updates.
    The Rule states that among the statements and schedules to be 
updated are H-1(3)(a) through H-1(3)(1). Williston Basin seeks 
clarification that the reference is to H-1(2)(a) through H-1(2)(k). 
Williston Basin is correct. The reference is being changed to H-1(2)(a) 
through H-1(2)(k).

p. Section 154.312  Composition of Statements

1. Schedule D-1
    The PEC Pipeline Group suggests that the filings would be more 
comprehensible and consistent if Sec. 154.312, Schedule D-1, were 
amended to include the functionalization of the as adjusted test period 
accumulated reserve for depreciation and amortization. PEC Pipeline 
Group also suggests a new Schedule D-3 showing the depreciation reserve 
balance applicable to the portion of the depreciation rate not yet 
approved. PEC Pipeline Group also suggests that Schedule D-1 should not 
be part of the workpapers.
    Schedule D-1 will be amended to include the functionalization of 
the as adjusted test period accumulated reserve for depreciation and 
amortization. However, a new Schedule D-3 is not necessary since the 
information required to reflect the depreciation reserve balance 
applicable to the depreciation rate not yet approved can be shown on 
the same schedule. Schedule D-1 is properly a workpaper since it 
reflects supporting data for Statement D.
2. Statement G, Revenues, Credits, and Billing Determinants
    Statement G is a summary of information on all jurisdictional 
services. Statement G must be filed with the rate case. More specific 
information, in Schedules G-1 through 6, must be filed 15 days later.
    i. Delayed filing of schedules. APGA states that, now that the 
Commission under Order No. 636 has relieved pipelines of mandatory 
triennial rate filings, the pipeline is generally in complete control 
of the date on which it makes a rate filing, and there is no reason to 
conclude that it is burdensome to file the information required in 
Schedule G-1 through G-6 at the same time as the rate filing. APGA 
states that most of the information required to be filed in those 
schedules should be easily accessible by the pipeline directly from its 
computer database, with little or no analysis required.
    APGA states that by permitting certain information to be filed 
after the filing date, the Commission is taking away with one hand what 
it has given customers with the other in requiring that a pipeline's 
Statement P testimony be filed concurrently with the rate case. In 
light of the Commission's requirement that this customer-specific 
information need only be served upon affected customers and those 
customers requesting service, APGA argues that the Commission should 
grant rehearing and require the information submitted under Schedules 
G-1 through G-6 to be filed concurrently with a pipeline's rate filing.
    APGA's request for rehearing is denied. The Commission has required 
a summary Statement G to provide enough information to begin the 
analysis of the rate case. However, the customer specific information 
is not required immediately; and, is filed 15 days later to ease the 
burden of the compilation of such large scale information on the filing 
pipeline.
    ii. Confidentiality. ANR and CIG join INGAA in urging the 
Commission to reconsider and incorporate the confidentiality provisions 
of the INGAA/AGD agreement in a final rule on rehearing.39 In the 
alternative, ANR and CIG request that the Commission permit pipelines 
to have the option, in all instances where customer specific 
information is called for (for example, in the schedules required in 
Statement G, the Index of Customers and Form 2 Revenues and Discounts), 
of using customer codes to identify customers.

    \39\ Specifically, the Agreement recommends that the Commission 
allow pipelines to serve Schedules G(1) and G(2) to requesting 
parties under a protective agreement document reached through 
negotiation between the pipeline and intervenors in the rate case. 
In the event that parties could not agree to such a document prior 
to filing, the pipeline would use the protective agreement employed 
for similar purposes in the pipeline's most recent rate case.
---------------------------------------------------------------------------

    The PEC Pipeline Group disagrees with the Commission's position 
regarding pipelines' market power in today's market and regulatory 
environment. The PEC Pipeline Group states that pipelines compete with 
one another and with customers using capacity on pipeline systems in 
new and innovative ways under the auspices of Order No. 636; and, non-
pipeline entities use capacity release and the ``gray'' market to 
compete with pipelines. PEC Pipeline Group states that the customers 
have a stake in avoiding public disclosure of the information because 
competitors of a customer will know what the pipeline expects to charge 
that customer over a future period of time, not just historically. PEC 
Pipeline Group requests clarification that coding and the projection of 
commodity billing determinants by rate schedule are appropriate to use 
in preparing Statement G and the related schedules. Alternatively, the 
PEC Pipeline Group requests clarification that the Commission 
recognizes the potential harmful effects on competition that public 
disclosure of test period information has and will thus entertain 

[[Page 9623]]
with favor, taking into account potential anticompetitive effects, 
requests for confidential treatment on a broad basis.
    These requests are denied for the reasons discussed, at length, in 
the Rule.40 The type of information for which PEC Pipeline seeks 
confidential treatment is the type of information that section 4(c) of 
the NGA requires pipelines to make publicly available.41 If 
confidentiality is sought as to test period information, Sec. 388.112 
sets out the procedure to be followed.

    \40\ III FERC Stats. & Regs. para. 31,025 at 31,412-3.
    \41\ For a full discussion on this issue, see ANR Pipeline 
Company, 65 FERC para. 61,280 at 62,304-7 (1993).
---------------------------------------------------------------------------

    iii. Capacity Release. Statement G requires that the pipeline 
provide: (1) Total revenues by rate schedule and by receipt and 
delivery rate zones, if applicable; and (2) billing determinants 
(demand and commodity) by rate schedule and by receipt and delivery 
rate zones, if applicable. Schedule G-3 also requires that the pipeline 
specify, quantify and justify each proposed adjustment including 
capacity release.
    ANR and CIG seek clarification that the requirements of Statement 
G, relative to capacity release, requires only summary level total 
revenue and billing determinants by receipt and delivery rate zones, if 
applicable, and does not require such information for each capacity 
release transaction. In the alternative, ANR and CIG seek rehearing if 
Statement G would require data for each capacity release transaction. 
ANR and CIG state that, since most capacity release transactions are 
for a term of a month or less, requiring detail for each capacity 
release transaction would be unduly burdensome, for example: based upon 
current experience, ANR would have about 1000 capacity release 
contracts for the base period; CIG would have approximately 400 
capacity release contracts for the base period. ANR and CIG state that 
if revenue and billing determinants of releasing shippers are not 
reduced for capacity release, then capacity release data is needed only 
for the design of usage rates. In such instances, ANR and CIG state 
capacity release data need only be provided by receipt and delivery 
rate zone, if applicable.
    ANR and CIG are correct. The Commission clarifies that Statement G, 
relative to capacity release, requires only summary level total revenue 
and billing determinants by receipt and delivery rate zones by 
releasing shipper. It does not require such information for each 
capacity release transaction.
3. Schedule G-2
    Schedule G-2 shows revenue and billing determinants by month, by 
customer name, by rate schedule, by receipt and delivery zone, if 
applicable, by major rate component and totals for the adjustment 
period. Great Lakes agrees that this requirement may be appropriate to 
the extent that a customer's adjusted throughput varies by month/
season. However, Great Lakes states, in the absence of such a 
variation, the monthly breakdown of adjustment period throughput does 
not serve any useful purpose and creates unnecessary paperwork. Great 
Lakes requests clarification that no monthly breakdown is required if 
the pipeline provides a written statement that its projected annual 
throughput is evenly distributed over each month of the adjustment 
period.
    The request for rehearing is denied. There is no need to make a 
generic change in the Rule. However, a pipeline demonstrating that its 
projected annual throughput is evenly distributed by months, may ask 
for a waiver of the monthly filing requirements.
4. Schedules G-5 and I-4
    Revenues from the release by the pipeline of transportation and 
compression capacity it holds on other pipelines (Account 858 capacity) 
must be reflected as a credit to Account 858 in Schedule I-4 and also 
as revenue in Schedule G-5 (Other Revenues).
    INGAA seeks clarification that revenues from capacity release are 
not double counted. INGAA states that, while inclusion of such revenues 
as a credit against Account 858 costs is appropriate, Schedule I-4 in 
Section 154.312(o)(4)(v) requires that revenues from released capacity 
be reflected, separately, in Schedule G-5. INGAA states that under this 
methodology, revenues from released capacity would count twice against 
cost of service; once as a credit towards Account 858 costs and second 
as other revenue. INGAA requests that the requirement to include these 
amounts in Statement G-5 be removed.
    The Commission agrees that these revenues should not be double 
counted. However, the revenues must be shown in both Schedules I-4 and 
G-5. If the revenues are credited to the cost of service in Schedule G-
5, then these revenues shown in Account 858 may be removed from the 
total costs claimed on Schedule I-4. However, if they are not reflected 
as a credit to the cost of service through Schedule G-5, then they must 
be counted as a credit in Schedule I-4 and Account 858.
5. Schedule H-1(1)
    Schedule H-1 requires identification and explanation of all accrual 
or other normalizing accounting entries reflected in the applicant's 
base period expenses.
    In response to a comment, the Commission revised proposed Schedule 
H-1(1) to require the disclosure and explanation of all accruals, not 
just special accruals reflected in the monthly per book expenses in 
order to allow customers to test whether a pipeline is inflating its 
expenses in order to increase its rates.42

    \42\ III FERC Stats. & Regs. para. 31,025 at 31,417.
---------------------------------------------------------------------------

    i. Explanation of all accruals. A. Requests for rehearing. Great 
Lakes argues that this section should not require the explanation of 
all accruals. Great Lakes argues that numerous accruals are necessarily 
recorded for items such as payroll, insurance, taxes, etc. Great Lakes 
states that separately identifying and explaining all base period 
accruals would be very time consuming and burdensome; and that, 
disclosure of meaningful data can be accomplished much more efficiently 
by adhering to the requirements set forth in both the Commission's 
previous regulations and the NOPR. Great Lakes states that adherence to 
this requirement, in addition to the Commission staff's audit and data 
request procedure, is more than sufficient to meet the commenter's 
concerns without requiring the burdensome production of data, the 
usefulness of which is questionable at best. PEC argues that there is 
no evidence that routine true-ups cause special ratemaking concerns and 
the original language should be reinstated.
    ANR and CIG also seek rehearing on these grounds and add that a 
rate case filing is not the proper forum for the disclosure and 
explanation of all accruals because such evaluation is currently 
performed by the Commission's Office of Chief Accountant (OCA) Staff 
and a company's external accounting firm. ANR and CIG also seek 
clarification or rehearing concerning whether the new rule requires a 
pipeline to explain the accruals appearing in every month in the base 
period. Since most of the individual monthly accruals will have been 
paid during the base or test period, and therefore there should be no 
question regarding inflation of such expenses, the only explanation of 
accruals that would be of value to any extent would be those that are 
recorded at the end of the test period. Thus, ANG and CIG state, to the 
extent that the rule requires an explanation of accruals, the 

[[Page 9624]]
explanation should only be with respect to accruals remaining on the 
books at the end of the test period.
    Williston Basin seeks rehearing of the requirement that certain 
expenses be stated on a cash basis. Schedule H-1(1) requires that 
pipelines reconcile their base period expenses to actual case 
expenditures. Williston Basin states that this imposes an enormous 
burden on pipelines as it conflicts with the method by which pipelines 
maintain their accounts under the Uniform System of Accounts.43 
Williston Basin states that recording these types of items on a cash 
basis would violate the Uniform System of Accounts and require 
companies to maintain two sets of accounting records: one which 
complies with the Uniform System of Accounts and one from which the H 
Schedules can be prepared. Williston Basin states that instead of 
adopting Schedule H-1(1) as written in Order No. 582, the Commission 
should adopt Schedule H-1(1) as written in the NOPR, whereby only 
``special accruals'' would be reconciled rather than ``all accruals.''

    \43\ According to the Uniform System of Accounts: ``The utility 
is required to keep its accounts on the accrual basis. This requires 
the inclusion in its accounts of all known transactions of 
appreciable amount which affect the accounts.'' 18 CFR Part 201, 
General Instruction No. 11. Under accrual accounting, assets and 
liabilities are recognized as they occur--not when they are paid. 
For example, the expense and liability for payroll taxes are 
recorded at the time the associated payroll is recorded, not when 
the taxes are paid. Similarly, the expense and liability for receipt 
of purchased materials is recorded when the materials are received. 
It is at the time of that the obligation to the vendor is 
established. Other examples of where the liability accrued precedes 
the actual cash payment include interest expense, income taxes, 
prepaid insurance, pension costs, post retirement benefit costs, and 
use taxes.
---------------------------------------------------------------------------

    B. Commission response. These requests for rehearing are granted. 
Under accrual accounting, many expenses are accrued one month and paid 
the next. With thousands of accrued entries on the books of most 
pipelines, the additional disclosure requirements included in Schedule 
H-1(1) regulations would be extremely lengthy, burdensome and, except 
for project development expenses, unnecessary. In addition, many of the 
accruals would have been paid during the base period, and thus present 
no danger of expense inflation. The only explanation of accruals that 
might be of value would be that of expenses recorded at the end of the 
base period. Accordingly, Schedule H-1(1) will be modified such that 
only ``special accruals'' are reconciled.
    ii. Project development costs. INGAA seeks clarification that 
Schedule H-1(1) regulations apply only to project development costs, as 
the Commission indicated in the preamble, and that these regulations 
should apply only to accruals remaining on the books at the end of the 
base period. This clarification is granted and Schedule H-1(1) is 
amended accordingly.
6. Schedule H-1(1)(c)
    Schedule H-1(1)(c) requires a pipeline to show expenses and 
associated quantities applicable to Accounts 810, 811 and 812. 
Williston Basin seeks rehearing of this requirement. Williston Basin 
states that the cost portion of this schedule should be eliminated 
because fuel costs are recovered by a separate mechanism under 
Williston Basin's existing tariff and such costs should, therefore, not 
be subject to review here. Alternatively, Williston Basin states that 
if a pipeline's fuel reimbursement tracker does not require a 
redetermination of the base level of gas in a rate proceeding, the 
Commission should not require that the pipeline provide this 
information.
    Williston Basin's request for rehearing is denied. As noted in the 
Rule, the Commission must review all fuel costs, whether recovered in a 
separate mechanism or not.44 Fuel usage is an important element of 
a pipeline's costs and though these costs may be tracked, a pipeline's 
tracker may require a redetermination of the base level in a rate 
proceeding. Since both volumes and costs are recorded in the fuel 
accounts the data are readily available.

    \44\ III FERC Stats. & Regs. para. 31,025 at 31,417.
---------------------------------------------------------------------------

7. Schedules H-1(2)(j)(iv)
    Schedule H-1(2)(j)(iv) requires that a pipeline document the 
derivation of the allocations used to appropriate costs among 
affiliated companies. The pipeline must also identify by account number 
all costs paid to or received from affiliated companies which are 
included in a pipeline's cost of service for both the base and test 
periods.
    INGAA requests that Schedule H-1 be amended such that documentation 
demonstrating the derivation of allocation bases with underlying 
calculations are to be provided, as they are today, during discovery. 
INGAA states that requiring all pipelines to provide this information 
with the original rate case filing is unduly burdensome because there 
are numerous types of costs allocated between divisions or companies, 
each with its own ``allocation basis and underlying calculations.'' 
INGAA states that in addition to reducing the burden on pipelines, 
providing the information during discovery would allow the data to be 
tailored better to the needs of intervenors and the nature of the 
pipeline.
    Rehearing is granted. The Commission agrees with INGAA that 
providing this type of information with the initial filing is not 
generally necessary. Schedule H-1(2)(j)(iv) will be amended by removing 
the requirement to provide documentation of the derivation of 
allocation bases.
8. Schedule I-1, Functionalization of Cost-of-Service
    Schedule I-1 replaces current Statement I (Allocation of overall 
cost-of-service). The information on jurisdictional and 
nonjurisdictional sales allocation is eliminated as no longer needed.
    Schedule I-1 (c) requires a pipeline that maintains its records by 
zones and proposes a zone rate methodology to provide functionalized 
costs for each zone. NGSA suggests that Schedule I-1 (c) should only be 
required for pipelines which separate their cost-of-service by zones. 
This is already the case. Section 154.310 requires a cost-of-service by 
zone only if a pipeline maintains records of costs by zones and 
proposes a zone rate methodology based on these costs. (See the 
discussion of Sec. 154.310.)
9. Schedule I-1 (d)
    NGSA states that on Schedule I-1 (d), pipelines should be required 
to show the basis for allocating all costs (A&G, working capital) among 
functions. NGSA states that the experience of its member companies is 
that the ``common and joint costs'' required by Schedule I often do not 
include A&G. Thus, the method used by the company to allocate A&G must 
be ascertained by means of the discovery process. NGSA submits that to 
explicitly include A&G in these regulations would clarify the 
requirement, and reduce discovery burden and delay in the rate case 
proceeding, and provide parties with important information with respect 
to an increasingly important category of costs.
    The Commission agrees with NGSA that Schedule I often does not 
include the allocation of A&G and this allocation should be included. 
Accordingly, Schedule I-1(d) will be revised to include the allocation 
of A&G.
10. Statement O
    NGSA requests that the rate history filing requirement be retained 
but modified to require the company to show its rate history only since 
its last major rate filing in Statement O. NGSA submits that retention 
of this limited 

[[Page 9625]]
form of the rate history requirement does not represent a burden on the 
pipeline, and provides parties with important summary information, 
difficult to obtain by other means, regarding the levels and effective 
periods for rates which have been in effect since the company's last 
filing.
    NGSA's request is denied. One purpose of the rule was to eliminate 
any unnecessary burdens of production to the pipeline company. This 
involves avoiding the duplication of information that can be gathered 
from another source. The history provided by Statement O is not relied 
on in the Commission analysis of a rate proceeding and is available 
through the Commission Issuance Posting System (CIPS).
11. Statement P
    In the past, pipelines filed their Statement P testimony 15 days 
after filing the rate proposal. The Rule requires Statement P to be 
filed concurrently with the rate case so as to make a more complete 
explanation of the rate proposal available at the outset.
    Williston Basin seeks rehearing of this requirement. Williston 
Basin states that the removal of this 15-day period unnecessarily 
shortens the period in which a pipeline must prepare and file a rate 
case. Williston Basin states that the Commission should grant rehearing 
so as not to place additional burdens on companies in preparing the 
voluminous statements and schedules that must accompany rate case 
filings.
    This request is denied for the reasons discussed in the Rule. 
45 The Commission's experience is that Statement P provides the 
most comprehensive description of the proposed rate change. To achieve 
its intended purpose of expediting the hearing, Statement P must serve 
as the applicant's complete case-in-chief, not a mere description of 
proposed rates. 46

    \45\ III FERC Stats. & Regs. para. 31,025 at 31,382 and 31,424.
    \46\ Statement P requires the pipeline to:
    Provide copies of prepared testimony indicating the line of 
proof which the company would offer for its case-in-chief in the 
event that the rates are suspended and the matter set for hearing. 
Name the sponsoring witness of all text and testimony. Statement P 
must be filed concurrently with the other schedules.
---------------------------------------------------------------------------

    It is the pipelines' statutory burden to demonstrate that proposed 
rates are just and reasonable. When the rates cannot be determined to 
be just and reasonable by the filed material alone, a hearing must be 
established. This Rule represents a concerted effort to avoid lengthy 
hearings. One way to expedite the process is to get the information 
needed to make merits determinations (Statement P) to the Commission 
and other parties sooner than under the current regulations.

q. 154.314  Other Support for a Filing

    The Rule does not require pipelines to file monthly financial 
reports prepared for management purposes and copies of accounting 
analyses of balance sheet accounts. 47

    \47\ III FERC Stats. & Regs. para. 31,025 at 31,425.
---------------------------------------------------------------------------

    APGA requests that the Commission grant rehearing and require 
pipelines to file financial reports as an integral part of a Section 4 
rate filing. APGA submits that a pipeline's financial statements are 
essential to an understanding of a pipeline's rate of return 
presentation and should be available up front to the parties to a rate 
proceeding. APGA states that if information contained in such reports 
is deemed commercially sensitive by the pipeline, it may file such 
information under seal subject to a protective agreement.
    APGA's request is denied. This data is not generally necessary in 
the early part of the process. Such information may be obtained through 
discovery after a rate case has been set for hearing.

r. Section 154.403  Periodic Rate Adjustments

    New Sec. 154.403 governs the passthrough, on a periodic basis, of a 
single cost item or revenue item not otherwise covered by subpart E, 
such as remaining purchased gas adjustment mechanisms, fuel loss and 
unaccounted-for gas, and transition cost filings.
1. Requests for Rehearing
    NGSA requests that the Commission reconsider NGSA's suggestions for 
periodic rate filing requirements, summarized in the Rule. 
Specifically, NGSA suggested the following items be required with 
filings made under this section:
    a. Reconciliation information for the past period which compares 
the volumes and revenues actually recovered to the volumes and costs 
used to design the rates previously in effect, with discounted 
transactions separately identified, and showing any past period 
underrecovery to be included in the new rate;
    b. Actual data on costs incurred since the last filing, compared to 
the costs on which the previous rates were based;
    c. Derivation of any discounting adjustment included in the 
proposed rates, citing the authority under which such adjustment is 
being made;
    d. Citations to data sources and approval order for data used which 
is derived elsewhere; and
    e. Requirement that costs, volumes, allocation and rate design be 
shown by zone of receipt/zone of delivery or other category used to 
charge rates, where appropriate.
    NGSA is concerned that where information is not required, it is not 
likely to be supplied. For example, NGSA states that the regulations do 
not require companies to include actual fuel used and fuel retained 
from shippers under the existing fuel rates when filing for new fuel 
retention rates. Thus, NGSA states, parties do not know if the 
pipeline's existing fuel rates have overrecovered or underrecovered 
actual fuel costs, and may have no actual basis on which to evaluate 
the proposed rates. NGSA states that, pursuant to Sec. 154.403(d)(3)), 
actual data are not required by the regulations where the proposed 
rates are based on estimates. Consequently, NGSA states, for filing 
under this subpart where discovery is not available to interested 
parties, there may be no way of obtaining the needed information. NGSA 
states that this circumstance would occur, for example, where the 
filing has not been set for hearing or where the parties had not 
previously agreed to a submission of the data.
2. Commission Response
    Section 154.403 is intended to cover a disparate array of potential 
cost recovery or revenue credit surcharges, in addition to fuel 
reimbursement mechanisms. The regulations adopted are intended to 
ensure the widest possible applicability.
    The Rule states that the information NGSA seeks will be available 
in the filings under this subpart. 48 NGSA requests that the 
regulations be revised to require reconciliation information for the 
past period which compares the volumes and revenues actually recovered 
to the volumes and costs use to design the rates previously in effect. 
Section 154.403(c)(6) already requires that where costs or revenue 
credits are accumulated over a past period for periodic recovery or 
return, the tariff must include provisions to define the past period, 
to detail the mechanism for recovering the cost or revenue, to describe 
the mechanism for calculating the entries to the deferral account and 
for passing through the account balance. Where necessary, the 
information NGSA seeks would be covered in the tariff provision 
required by Sec. 154.403(c)(6).

    \48\ III FERC Stats. & Regs. para. 31,025 at 31,427.
    
[[Page 9626]]

---------------------------------------------------------------------------

    Similarly, while the derivation of discounting adjustments is not 
specifically listed under the filing requirements in Sec. 154.403(d), 
Sec. 154.403(c)(8) requires the tariff to provide, on a step-by-step 
basis, how the pipeline's methodology for calculating its surcharge 
will be affected by rate discounts. The pipeline must then follow this 
methodology when it files to change its rates. When the pipeline files 
to establish its methodology in the tariff, sufficient detail must be 
incorporated in the tariff to establish the step-by-step calculation 
methodology. It is in fashioning the tariff provision that detailed 
information requirements will be established such as those NGSA would 
include in the regulations. It is not, therefore, necessary for the 
regulations to explicitly require discounted transactions to be 
separately identified. Nor is it necessary to modify the regulations to 
include the requirement that the derivation of any discounting 
adjustment be included in the proposed rates.
    Some of the data NGSA wishes the regulations to require are already 
explicitly required by the new regulations. For example, 
Sec. 154.403(d)(1)(ii) requires computations to be shown for each 
surcharge or fuel reimbursement percentage to be applied. The 
computations should be broken down by service, classification, area, 
zone, or other subcategory as appropriate. Therefore, NGSA's request 
that the regulations require costs, volumes, allocation, and rate 
design be shown by zone of receipt/zone of delivery or other category 
used to charge rates would be redundant. In addition, 
Secs. 154.403(d)(1) (iv) and (v) require the pipeline to cite the 
source of the costs, revenues, rates, quantities, indices, load 
factors, percentages, or other numbers used in the calculations. NGSA's 
request that citations to data sources be required is, therefore, 
already in the regulations.
    Section 154.403(c)(5) requires a step-by-step description of the 
cost calculation and flowthrough methodology to be included in the 
tariff. Any comparison between actual costs incurred and the costs 
underlying the previous rate may be appropriate for inclusion in the 
methodology required by the referenced section. That determination must 
be made at the time the tariff language setting forth the methodology 
is accepted.

s. Section 154.501(a)

    Section 154.501(a) states that ``[t]he refund plus interest must be 
distributed as specified in the Commission order requiring or approving 
the refund, or if no date is specified, within 60 days of the order.''
1. Refund Upon Final Order
    Williston Basin states that refunds should be required only upon 
the issuance of the final Commission order in the proceeding. Williston 
Basin states that in an instance where a pipeline requests rehearing or 
appellate review of a Commission order imposing refund liability, the 
refund should be deferred until after final ruling to avoid the 
necessity for further refunds or for the required rebilling of 
prematurely refunded amounts. Williston Basin states that it has become 
increasingly difficult, if not impossible, to collect prematurely 
refunded amounts from transient shippers.
    Williston Basin states that shippers are well protected from any 
delay they might experience in receiving their refunds since they 
receive interest on the amount which the pipeline must refund; thus, 
they are made whole for any overpayment amounts which the pipeline 
held. Williston Basin states that if pipelines are forced prematurely 
to make refunds before a final, nonappealable agency order is issued 
pipelines could be left holding an empty bag as they would have to 
track down shippers that may no longer exist to recover these premature 
refunds.
2. Commission Response
    Section 154.501(a) was patterned in part after former 
Sec. 154.67(c). Former Sec. 154.67(c) noted that the date of any refund 
would be determined in a final Commission order. Section 154.501(a) 
retained this provision but added that if no specific date is set, the 
refund must be made within 60 days of the order. The regulation did not 
specify the procedure to follow in an instance where a pipeline 
requests rehearing or appellate review of a Commission order imposing 
refund liability. To avoid any confusion, the regulation will be 
revised to read that in the event no date for the refund is set by the 
Commission order establishing the refund obligation, the refund must be 
made within 60 days of a final Commission order. For purposes of this 
section, final order will mean an order no longer subject to rehearing. 
Williston Basin's request that the refund disbursement be delayed until 
after judicial review is denied as inconsistent with the NGA. 49

    \49\ Section 19(c) of the NGA provides that:
    The filing of an application for rehearing under subsection (a) 
shall not, unless specifically ordered by the Commission, operate as 
a stay of the Commission's order. The commencement of proceedings 
under subsection (b) of this section shall not, unless specifically 
ordered by the court, operate as a stay of the Commission's order. 
Waiting to disburse a refund until after appeals court review would 
entail undue delay and would be inconsistent with current practice. 
15 U.S.C. 717r(c).
---------------------------------------------------------------------------

t. Section 501(d)

1. Higher Interest Rate
    AGD proposes procedures to reduce the level and duration of 
excessive pipeline rate increases including an amendment to 
Sec. 154.501(d). AGD proposes that the Commission exercise its 
discretion to prescribe a higher interest rate to apply to refunds of 
pipeline's excessive charges. The proposed percentage AGD recommends is 
one that would be high enough to deter the pipeline from seeking 
excessive rate increases so that such increases are limited to those 
which can be fully justified. AGD states that such an interest rate 
would be equal to the rate of return on equity sought by the pipeline 
in its rate filing. AGD states that this interest rate would be a 
significant deterrent to a pipeline's unsubstantiated rate increase 
proposal and provide the pipeline with a necessary incentive to 
cooperate with its customers in the early disposition of its rate 
increase proposal, an incentive that no longer exists under the SFV 
rate design standard.
2. Commission Response
    AGD seeks to change the Commission's provision for carrying charges 
under Sec. 154.501(d) from a vehicle to ensure compensation for the 
time value of money into an incentive mechanism for modest rate 
increase proposals on the part of the pipelines. The Commission does 
not intend to change any substantive ratemaking policies through this 
Rule. Thus, AGD's request is beyond the scope of the Rule and is 
denied.
3. Surcharges
    ANR and CIG request clarification that the Commission's intent is 
to allow pipelines, that are required to pay surcharges to other 
pipelines as a result of a Commission order, to recover such surcharges 
from customers within 30 days of the pipeline paying such charges 
through the mechanism of a limited section 4 filing.50

    \50\ For example, in Docket No. RP91-143-027, 72 FERC para. 
61,081 (Remand Order), the Commission directed Great Lakes to 
effectuate refunds and surcharges to expansion and pre-expansion 
shippers, respectively. Under the clarification sought by ANR and 
CIG, pipelines that incur surcharges pursuant to the Remand Order 
could file limited section 4 filings seeking authority to increase 
their rates to pass through to their shippers the amount of the 
Great Lakes surcharge, and such authority would be granted.

[[Page 9627]]

    If such clarification is denied, ANR and CIG request rehearing 
stating that the change to Sec. 154.501 improperly mandates a one-sided 
exception to test period ratemaking. ANR and CIG state that requiring a 
pipeline to pay to customers refunds received after the end of the test 
period underlying the pipeline's rates violates Secs. 154.303 and 
154.63(e)(2) of the Commission's regulations. ANR and CIG state, unless 
the Commission implements an exception to this regulation in an even 
handed manner, equity dictates that pipelines should not be required to 
pass through a refund from an upstream pipeline unless the Commission 
determines that the pipeline is overrecovering its costs after 
reviewing all of the pipeline's other costs and revenues.
    In any event, ANR and CIG request that the 30-day provision be 
clarified with respect to minor refunds and surcharges. Specifically, 
they request that minor refunds be treated as billing adjustments which 
will be reflected in the next billing 30 days subsequent to receipt, 
and surcharges be reflected in the next billing 30 days subsequent to 
billing.
4. Commission Response
    In response to ANR/CIG's comments to the NOPR, the Commission 
stated in the Rule that cost increases must be filed for by the 
pipeline. Pipelines would not receive automatic passthrough authority 
within 30 days of the pipeline paying such charges. A pipeline paying 
increased charges to an upstream pipeline must file to recover these 
costs through a section 4 filing. The Commission will not prejudge the 
proper approach for passing through costs paid to one pipeline by 
another. Regulations governing such cost passthrough are contained 
elsewhere in Part 154. ANR/CIG's request for clarification is denied.
5. One-Way Tracker
    ANR/CIG reiterates, on rehearing, its comment to the NOPR that the 
language proposed in the NOPR mandated the institution of a one-way 
tracker. In response to that comment, the Commission clarified the 
language of Sec. 154.501(a)(2) to ensure that the refund either is a 
product of a prior Commission order or occurs in conjunction with a 
tracker filing instituted under Sec. 154.403. The provision is not a 
universal requirement for flow through of upstream pipeline refunds as 
ANR/CIG implies and does not violate the test period concept. This is 
so because the refund passthrough either is required by a specific 
Commission order or is made in conjunction with a cost tracking 
provision approved by the Commission. A cost tracker permits the 
pipeline to recover costs paid subsequent to the end of the test period 
without having to file a general rate case and submit to a review of 
all costs and revenues. Therefore, to ensure those costs are not over-
recovered, refunds of costs collected from customers by means of a rate 
established under a tracking mechanism must be flowed through to 
customers.
6. Minor Refunds
    ANR/CIG request clarification that the 30-day provision relates to 
minor refunds and surcharges. Sections 154.501 and 154.502 relate 
solely to refunds, not to surcharges.
    The Commission adopted a single generic standard of 30 days to pass 
through refunds. The difficulty with making an exception for minor 
refunds is defining what constitutes a minor refunds. A minor amount on 
one pipeline may represent a significant amount on another pipeline. It 
is preferable to have a single generic standard. The Commission will 
review requests for exceptions for disbursing minor refunds through 
billing adjustments on a case-by-case basis, thereby allowing such a 
provision to be tailored to the specific circumstances of each 
pipeline.

u. Topsheets

    APGA requests rehearing of the Commission's determination that it 
should not establish a time frame for the submission of Staff 
topsheets.
    This matter has been fully considered and discussed in the Rule. 
APGA's arguments do not warrant further consideration or a different 
conclusion. This request is denied for the reasons discussed in the 
Rule.51

    \51\ III FERC Stats. & Regs. para. 31,025 at 31,431.
---------------------------------------------------------------------------

v. Bifurcation

    AGD suggests, as a strategy to expedite pipeline rate case 
decisions, an early bifurcation of a given proceeding into two separate 
categories for decisionmaking. The Commission's suspension order in a 
pipeline rate case would divide the issues to be addressed by the ALJ 
and the parties in two categories, one of which would be subject to a 
final Commission decision deadline of 12 months from the filing date, 
while the other category could have a different Commission decision 
deadline. In the first, 12 months-to-decision category, the issues 
would include those concerning the pipeline's filed-for cost of service 
and its throughput and/or other issues which lend themselves to prompt 
decisions. The Commission's rules would provide that, in the absence of 
compelling reasons, all rate case issues concerning the pipeline's cost 
of service and its throughput volume, including rate of return, 
depreciation rate and other similar issues would be addressed by the 
ALJ and by the Commission within 12 months of the filing date.
    The second category of issues would be those concerning the 
pipeline's rate design and/or its allocation of costs among functions 
and among customers according to their rate schedule. This latter 
category of issues may involve more complex questions and may require 
the use of expert testimony, exhibits and other evidence to frame the 
issues for Commission decision.
    The Commission recognizes that the proposed procedure might have 
the effect of expediting pipeline rate case decisions. However, before 
implementation, the Commission would require more study as to the 
potential effects of such a procedure on the rate case as well as what 
further changes would have to be made to the filing requirements. The 
suggested change is simply beyond the scope of the purposes of this 
Rule and will not be adopted.

w. Electronic Pleading

    NGC states that the Commission on rehearing should add to its list 
of goals the electronic service of pleadings. NGC states that, with the 
internet and world-wide web gaining such increased prominence in recent 
months, it is time the Commission implemented electronic service 
through the CIPS system.
    Expanding electronic filing requirements to pleadings is outside 
the scope of this rulemaking.

x. Suspension of Electronic Filing

    The Commission is suspending the requirement to submit filings 
under subpart D electronically until the new electronic filing 
requirements are fully developed.52

    \52\ III FERC Stats. & Regs. para. 31.025 at 31,433.
---------------------------------------------------------------------------

    INGAA seeks clarification that after electronic filing requirements 
have been finalized, there would be a period of six months for 
pipelines to develop internal software and procedures that match their 
data to the newly developed electronic filing requirements. During this 
period, pipelines would continue to file rate cases on paper.
    In accordance with the Rule, staff convened an informal conference 
on December 1, 1995, to discuss issues 

[[Page 9628]]
relating to electronic filing which had not been resolved. Issues 
relating to the Index of Customers and discount rate filings have been 
resolved. The final specifications will be issued shortly. Two working 
groups were established--one to complete work on Form Nos. 2, 2A and 11 
and one to complete work on rate case filings. The working groups met 
on December 12, 1995, February 7, 1996 and February 8, 1996.
    The Commission expects to have work completed on Form No. 11 in 
time for the first filings due on May 15, 1996. Given the relative 
simplicity of the Form No. 11, there should be no difficulty meeting 
this timetable. A delay of six months is excessive for this filing.
    The Form Nos. 2, and 2A, and rate case filings, however, are far 
more complex. Form Nos. 2 and 2A must be filed electronically on April 
30, 1997. However, staff and the Working Group--Forms are urged to use 
due diligence to complete the filing specifications by October 31, 
1996, in order to provide the six month preparation time INGAA seeks.
    As regards electronic filing for rate cases, the Commission will 
not adopt INGAA's proposal that its implementation be delayed until six 
months after the Commission issues the electronic filing 
specifications. Several pipelines in the working group are providing 
test files of rate case data in the new file format. It is preferable 
to wait until the working group process is complete and staff has 
better information about the amount of time the test pipelines required 
to create files in the new file format before making a decision on the 
appropriate amount of delay between the issuance of file specifications 
and implementation of the electronic filing requirements for rate 
cases. Therefore, the Commission will defer making a ruling on this 
issue until staff issues the file specifications for the rate case.

y. Effective Date

    The final rule became effective on November 13, 1995, 30 days after 
publication in the Federal Register.
    The NOPR proposed that the revised regulations would be effective 
90 days after publication in the Federal Register.53 However, the 
Rule made the revisions effective 30 days after publication in the 
Federal Register.54

    \53\ IV FERC Stats. & Regs. para. 32,511 at 32,944.
    \54\ III FERC Stats. & Regs. para. 31,025 at 31,375.
---------------------------------------------------------------------------

    INGAA states that it would be impossible for pipelines who might be 
in the process of preparing a rate case to implement the Rule within 30 
days. INGAA seeks clarification that the effective date will be 90 days 
after publication in the Federal Register. The Rule already is in 
effect. Thus, this request is denied as the issue is moot.
    INGAA also seeks clarification that the order does not apply to 
pending rate cases. This request is granted.
    ANR and CIG request clarification of when pipelines are required to 
make changes to their tariff to bring the tariff into compliance with 
the new Rule. In some instances, such as a filing for a rate change, it 
is clear that the next filing would trigger the Rule's requirements. 
However, it is not clear when pipelines will have to make other 
revisions to their present tariffs, such as conforming the title page 
of their tariff to the new Rule's requirements or providing 
explanations of policies on such issues as discounts.
    The Commission clarifies that all filings and tariffs on file must 
be in compliance with the revised regulations no later than December 
31, 1996.

List of Subjects in 18 CFR Part 154

    Alaska, Natural Gas, Pipelines, Reporting and recordkeeping 
requirements.

The Commission Orders

    (A) The requests for rehearing and clarification of Order No. 582, 
the final rule issued in this docket on September 28, 1995, are granted 
and denied as discussed in the text of this order.
    (B) All filings and tariffs on file must be in compliance with the 
revised regulations promulgated by Orders No. 582 and 582-A, no later 
than December 31, 1996. By the Commission.
Lois D. Cashell,
Secretary.

    In consideration of the foregoing, the Commission is amending part 
154, Chapter I, Title 18, Code of Federal Regulations, as set forth 
below.

PART 154--RATE SCHEDULES AND TARIFFS

    1. The authority citation for part 154 continues to read as 
follows:

    Authority: 15 U.S.C. 717-717w; 31 U.S.C. 9701; 42 U.S.C. 7102-
7352.

    2. Section 154.7 is amended by revising paragraph (a)(6) to read as 
follows:

Sec. 154.7  General requirements for the submission of a tariff filing 
or executed service agreement.

* * * * *
    (a) * * *
    (6) A statement of the nature, the reasons, and the basis for the 
filing. The statement must include a summary of the changes or 
additions made to the tariff or executed service agreement, as 
appropriate. The statement must include a quantified summary comparing 
the cost of service, rate base and throughput underlying each change in 
rate made to the tariff or executed service agreement compared to the 
same information underlying the last rate found by the Commission to be 
just and reasonable. A detailed explanation of the need for each change 
or addition to the tariff or executed service agreement must be 
included. The natural gas company also must note all relevant 
precedents relied upon to prepare its filing.
* * * * *

Sec. 154.101  [Amended]

    3. In Sec. 154.101, the words ``\1/4\ inches'' are removed and the 
words ``1\1/4\ inches'' are added in their place.
    4. Section 154.208 is amended by revising paragraph (c) and adding 
paragraph (d) as follows:

Sec. 154.208  Service on customers and other parties.

* * * * *
    (c) Within two business days of receiving a request for a complete 
copy from any customer or state commission that has not made a standing 
request, the company must serve a full copy of any filing.
    (d) A customer or other party may designate a recipient of service. 
The filing company must serve the designated recipient, in accordance 
with paragraphs (a), (b) and (c) of this section, instead of the 
customer or other party. For the purposes of this section, service upon 
such designated recipient will be deemed service upon the customer or 
other party.
    5. Section 154.301 is amended by revising paragraph (c) as follows:

Sec. 154.301  Changes in rates.

* * * * *
    (c) A natural gas company filing for a change in rates or charges 
must be prepared to go forward at a hearing and sustain, solely on the 
material submitted with its filing, the burden of proving that the 
proposed changes are just and reasonable. The filing and supporting 
workpapers must be of such composition, scope, and format as to 
comprise the company's complete case-in-chief in the event that the 
change is suspended and the matter is set for hearing. If the change in 
rates or charges presented are not in full accord with any prior 
Commission decision directly involving the filing company, the company 
must include in its working 

[[Page 9629]]
papers alternate material reflecting the effect of such prior decision.
    6. Section 154.303 is amended by revising paragraph (c)(2) to read 
as follows:

Sec. 154.303  Test periods.

* * * * *
    (c) * * *
    (2) When a pipeline files a motion to place the rates into effect, 
the filing must be revised to exclude the costs associated with any 
facilities that will not be in service as of the end of the test 
period, or for which certificate authorization is required but will not 
be granted as of the end of the test period. At the end of the test 
period, the pipeline must remove from its rates costs associated with 
any facility that is not in service or for which certificate authority 
is required but has not been granted.
* * * * *
    7. Section 154.304 is amended by revising paragraphs (b) and (c) to 
read as follows:

Sec. 154.304  Format of statements, schedules, workpapers and 
supporting data.

* * * * *
    (b) The data in support of the proposed rate change must include 
the required particulars of book data, adjustments, and other 
computations and information on which the company relies, including a 
detailed narrative explanation placed at the beginning of the specific 
statement or schedule to which they apply, explaining each proposed 
adjustment to base period actual volumes and costs.
    (c) Book data included in statements and schedules required to be 
prepared or submitted as part of the filing must be reported in a 
separate column or columns. All adjustments to book data must also be 
reported in a separate column or columns so that book amounts, 
adjustments thereto, and adjusted amounts will be clearly disclosed. 
All adjustments must be supported by a narrative explanation placed at 
the beginning of the specific statement or schedule to which they 
apply.
* * * * *
    8. Section 154.311 is revised to read as follows:

Sec. 154.311  Updating of statements.

    (a) Certain statements and schedules in Sec. 154.312, that include 
test period data, must be updated with actual data by month and must be 
resubmitted in the same format and with consecutive monthly totals for 
each month of the adjustment period with a single set of updates 
encompassing a 12-month period. The updated statements or schedules 
must be filed 45 days after the end of the test period. The updated 
filing must be provided to parties specifically requesting them. The 
updated filing must reference the associated docket number and must be 
filed in the same format, form, and number as the original filing.
    (b) The statements and schedules in Sec. 154.312 to be updated are: 
Statements C, D and H-4; Schedules B-1, B-2, C-3, D-2, E-2, E-4, G-1, 
G-4, G-5, G-6, H-1 (1)(a), H-1 (1)(b), H-1 (1)(c), H-1 (2)(a) through 
H-1 (2)(k), H-2 (1), H-3 (3), I-4, and I-6.
    (c) This requirement to file updates may be extended by the 
Secretary pursuant to Sec. 375.302 of this chapter.
    9. Section 154.312 is amended by revising paragraphs (d)(1), 
(k)(1), (k)(15)(iv) and (o)(1)(iv) as follows:

Sec. 154.312  Composition of Statements.

* * * * *
    (d) * * *
    (1) Schedule D-1. This schedule is part of the workpapers. Show the 
depreciation reserve book balance applicable to that portion of the 
depreciation rate not yet approved by the Commission, the depreciation 
rates, the docket number of the order approving such rate, and an 
explanation of any difference. Reflect actual end of base period 
depreciation reserve functionalized and test period depreciation 
reserve functionalized. Show accumulated depreciation and amortization, 
in columnar form, for the ending base and test period balances by 
functional classifications of Accumulated Depreciation reserve. 
(Examples are provided in Schedule C-1). For each functional plant 
classification, show depreciation reserve associated with offshore and 
onshore plant separately.
* * * * *
    (k) * * *
    (1) Schedule H-1 (1). This schedule is part of the workpapers. Show 
the labor costs, materials and other charges (excluding purchased gas 
costs) and expenses associated with Accounts 810, 811, and 812 recorded 
in each gas operation and maintenance expense account of the Uniform 
System of Accounts. Show these expenses, under the columnar headings, 
with subtotals for each functional classification, as follows: 
operation and maintenance expenses by months, as booked, for the 12 
months of actual experience, and the 12-month total; adjustments, if 
any, to expenses as booked; and total adjusted operation and 
maintenance expenses. Disclose and explain all accrual on the books at 
the end of the base period or other normalizing accounting entries for 
internal purposes reflected in the monthly expenses presented per book. 
Explain any amounts not currently payable, except depreciation charged 
through clearing accounts, included in operation and maintenance 
expenses.
* * * * *
    (15) * * *
    (iv) The bases used in determining the amounts of the charges 
(credits). Explain and demonstrate the derivation of the allocation 
bases with underlying calculations used to allocate costs among 
affiliated companies, and identify (by account number) all costs paid 
to, or received from affiliated companies which are included in a 
pipeline's cost-of-service for both the base and test periods.
* * * * *
    (o) * * *
    (1) * * *
    (iv) Schedule I-1(d). Show the method used to allocate common and 
joint costs to various functions including the allocation of A&G. 
Provide the factors underlying the allocation of general costs (e.g., 
miles of pipe, cost of plant, labor). Show the formulae used and 
explain the bases for the allocation of common and joint costs.
* * * * *
    10. Section 154.501 is amended by revising paragraph (a)(1) to read 
as follows:

Sec. 154.501  Refunds.

    (a) Refund Obligation. (1) Any natural gas company that collects 
rates or charges pursuant to this chapter must refund that portion of 
any increased rates or charges either found by the Commission not to be 
justified, or approved for refund by the Commission as part of a 
settlement, together with interest as required in paragraph (d) of this 
section. The refund plus interest must be distributed as specified in 
the Commission order requiring or approving the refund, or if no date 
is specified, within 60 days of a final order. For purposes of this 
paragraph, a final order is an order no longer subject to rehearing. 
The pipeline is not required to make any refund until it has collected 
the refundable money through its rates.
* * * * *

    Note: This Appendix will not appear in the Code of Federal 
Regulations.

Appendix

    Minor modifications are made to the electronic filing 
instructions for tariff sheets. The instructions for completing the 
``TF07'' 

[[Page 9630]]
record have been corrected. In the previous version of these 
instructions, the position for the FERC Cite was erroneously given 
as character position 43-49. The correct character position is 5-11. 
The Commission's software, the FERC Automated System for Tariff 
Retrieval, FASTR, will recognize the FERC cite whether entered in 
positions 43-49 or 5-11. The Commission is allowing pipelines to 
file other electronic filings on CD-ROM. The Commission will extend 
this option to electronic tariff filings as well.

Natural Gas Pipeline Company Tariff Filings

Revised

Docket No. RM95-3-001

------------------------------------------------------------------------
                                                              Expiration
                          OMB Nos.                               date   
------------------------------------------------------------------------
1902-0066..................................................      5/31/97
1902-0070..................................................      5/31/97
1902-0152..................................................      5/31/97
1902-0153..................................................      5/31/97
1902-0154..................................................      6/30/96
1902-0155..................................................      5/31/97
------------------------------------------------------------------------

    This document replaces the Tariff Filing Record Formats issued 
August 31, 1989.

General Information

I. Purpose

    All companies which maintain a gas tariff with the Federal 
Energy Regulatory Commission (FERC) are required to submit, along 
with the paper copies, an electronic version of all tariff filings 
pursuant to section 385.2011 of the Commission's regulations. 
Companies are required to have an electronic version of their entire 
gas tariff (excluding Volume No. 2 contractual rate schedules) on 
file with FERC on or before January 26, 1996 This form does not 
modify the existing tariff sheet format required in section 154.102 
or section 385.2003 for tariff sheets filed on paper. Nor does it 
modify the requirement in section 154.201(a) to file a marked paper 
version of the pages to be changed by showing additions and 
deletions using highlighting, background shading, bold text, or 
underlined text.

II. Who Must File

    All companies who are required to maintain a FERC Gas Tariff on 
file with the FERC.

III. What To Submit

    All proposed revisions to the FERC Gas Tariff will be submitted 
in conformance with this form. Such proposed revisions include, but 
are not limited to, rate changes pursuant to a Section 4 filing or 
changes in service pursuant to a certificate issued as a result of a 
section 7 proceeding. Upon request of the Secretary of the FERC, 
companies must submit such additional supporting and clarifying data 
and information as may be specified.
    All data will be submitted on diskette(s), preferably 3.5'' High 
Density diskettes, and must conform to the specific instructions 
provided in Exhibit A. Optionally, data may be submitted on CD. 
Filings in this medium must conform to the specifications in Exhibit 
A. The diskette(s) or CD(s) must be accompanied by paper copies of 
the information submitted on the diskette. The paper copies must 
conform in all respects to the requirements of sections 154 and 157 
and will consist of the required number of copies of the transmittal 
letter, the tariff sheets, the certification of service, and a form 
of notice suitable for publication in the Federal Register.
    The letter of transmittal and the certification of service will 
be submitted on paper only. The letter of transmittal must include 
the subscription provided in section 385.2005(a). The subscription 
provided must state, in addition to the requirement in section 
385.2005(a), that the paper copies contain the same information as 
the diskette(s) and that the signer has read and knows the contents 
of the paper copies and that the contents as stated in the paper 
copies are true to the best knowledge and belief of the signer.
    Respondents claiming that information is privileged must file in 
accordance with section 385.1112; otherwise, all data submitted will 
be considered non-privileged and will be made available to the 
public upon request.

IV. When To Submit

    The tariff sheets should be filed with the Commission at the 
time the company proposes a change in service or rate. The notice 
period should be consistent with the Commission's regulations.

V. Where To Submit

    (1) Submit this report to: Office of the Secretary, Federal 
Energy Regulatory Commission, Washington, DC 20426.
    (2) Hand deliveries may be made to the same address.
    You shall not be penalized for failure to respond to this 
collection of information unless the collection of information 
displays a valid OMB control number.

General Instructions

    (1) Schedule TF. Records TF01 through TF07 and the text line 
records are intended to capture all of the tariff elements which the 
pipeline has historically filed as part of its FERC Gas Tariff. 
Record TFO1 identifies the company and the filing date. Record TF02 
captures information about the tariff volume; and Records TF03, 
TF04, TF05, TF06, and TF07 contain requisite marginal information 
for an individual tariff sheet. The actual tariff sheet text will 
follow Record TF07.
    Each tariff sheet should be identified by the nature of the 
sheet, and assigned the appropriate ``Text ID'' from among those 
listed in the layout for Record TF03. For example, a tariff sheet 
which includes the table of contents must be assigned Text ID = 
``1''. The text of a tariff sheet should include any footnotes 
applicable to the individual tariff sheet. When filing the tariff 
sheet on paper, footnotes should appear inside the ruled borders 
required by section 154.101.
    All of the marginal information required under 18 CFR 
Sec. 154.102(d) is to be included only in the tariff sheet header 
records. These header records will be utilized to print a hard copy 
with the appropriate marginal information.
    If a tariff sheet is filed to be read vertically in hard copy, 
this is referred to hereinafter as ``Portrait'' orientation. If the 
sheet will be read horizontally, the orientation is referred to as 
``Landscape.'' The requirements of section 154.101 imply that the 
length of a line of actual text is 6.75 inches in Portrait 
orientation, and 10.0 inches in Landscape. The pitch, the number of 
print characters per horizontal inch (cpi); the number of lines per 
vertical inch (lpi); and the page orientation for printing the 
tariff sheet must be given in the first Tariff Sheet Header Record, 
(Record TF03). The number of characters per horizontal inch (cpi) 
must not exceed 17. The acceptable lines per vertical inch are 6 or 
8. The maximum line length and lines per page for Portrait and 
Landscape orientation are as follows:

------------------------------------------------------------------------
                                    Maximum line length        Maximum  
                                       (characters)           lines per 
       Page orientation        ----------------------------     page    
                                                           -------------
                                10cpi  12cpi  15cpi  17cpi   6lpi   8lpi
------------------------------------------------------------------------
Vertical (portrait)...........     65     79     98    112     50     70
Horizontal(landscape).........     98    118    148    168     31     44
------------------------------------------------------------------------

    (2) Record Types. Records must be filed in the following order:
    Company Header Record (TF01): One record per dataset.
    Volume Header Record (TF02): One record per volume. All pages 
for the same volume will be grouped together. If more than one 
dataset is required for the filing of a volume, this record must 
appear in each dataset. Note: When more than one dataset is needed 
to accommodate a filing, name the datasets in accordance with the 
instructions in Exhibit A.

    Note: The Appropriate Tariff Sheet Header Records Must Precede 
Each Tariff Sheet!

    Sheet Header Record (TF03): One record per sheet. 
    
[[Page 9631]]

    Superseded Sheet Header Record (TF04): This record pertains to 
the superseded sheet information. One record per sheet unless there 
is no superseded sheet (e.g., Original and Substitute Original 
sheets). In that case, this record may be omitted.
    Issuing Officer Header Record (TF05): One record per filing, 
unless the filing contains sheets that reference more than one 
issuing officer or the tariff sheets are submitted in more than one 
dataset. Optionally, this record may precede every tariff sheet 
filed.
    Date and Docket Header Record (TF06): One record per filing, 
unless the effective date or other information in this record 
changes from sheet to sheet or the tariff sheets are submitted in 
more than one dataset. Optionally, this record may precede every 
tariff sheet filed.
    FERC Cite (TF07): One record per sheet. This header record 
should only accompany tariff sheets filed in compliance with an 
order of the Commission.
    Text Line Records: The actual tariff sheet text. Note: any 
special codes placed in the text (such as bold, italic, underline, 
etc.) are removed when converting to ASCII format.
    (3) Numeric Fields. All numeric fields in Records TF01 through 
TF06 must not be left blank, and must be right justified unless 
indicated otherwise. The following conventions should be followed in 
preparing each header record in the filing:
    (A) If a numeric data item is not applicable to the respondent, 
enter the numeric value ``0'' in the field provided for this data 
item.
    (B) Do not include commas in reporting any numeric value.
    (C) Report all dates as six digit numerics (month, day, year, 
MMDDYY).
    (4) Pipeline Company ID. Use the code for the pipeline as 
contained in the Buyer Seller Code List, U.S. Department of Energy's 
publication DOE/EIA-0176. A code may be obtained by calling EIA at 
(202) 586-8841.
    (5) Record Lengths. Do not pad the end of data records with 
blanks.

Specific Instructions

    (1) Effective Date. The date, given as month, day, and year, on 
which the respondent expects the filing to be put into effect 
subject to the concurrence of the FERC.
    (2) Tariff Volume Number. The number of the volume to which the 
tariff sheets belong. For example, if the volume is labeled ``Second 
Revised Volume No. 1,'' report a ``1'' in this field.
    (3) Tariff Volume Revision Number. Report the number of the 
revision. For example, if the tariff volume is labelled ``Second 
Revised Volume No. 1,'' report a ``2'' in this field. If the tariff 
volume is an original volume, report a zero in this field.
    (4) Tariff Volume ID. Report the full tariff volume name in this 
field. For example, if the volume is labelled ``First Revised Volume 
No. 1,'' report ``First Revised Volume No. 1'' in this field.
    (5) Sheet Number. Report the number of the tariff sheet being 
filed. For example, if the sheet is numbered ``First Revised Sheet 
No. 3 superseding Original Sheet No. 3,'' report a ``3'' in this 
field.
    (6) Sheet Revision Number. Report the number of the revision. 
For example, if the tariff sheet is numbered ``Second Substitute 
Third Revised Sheet No. 4 superseding Second Revised Sheet No. 4,'' 
report a ``3'' in this field. If this is an original tariff sheet, 
report a ``0'' in this field.
    (7) Sheet ID. Report the full designation for the tariff sheet 
being reported. For example, if the sheet is designated ``First 
Revised Sheet No. 3 superseding Original Sheet No. 3,'' report 
``First Revised Sheet No. 3'' in this field. If the Sheet ID exceeds 
the allowed 40 character positions for this item, use the 
``Abbreviation Conventions List'' at Exhibit C.
    (8) Superseded Sheet ID. Report the full designation for the 
tariff sheet being superseded. For example, if the tariff sheet 
being filed is designated ``First Revised Sheet No. 3 superseding 
Original Sheet No. 3,'' report ``Original Sheet No. 3'' in this 
field. If the Superseded Sheet ID exceeds the allowed 40 character 
positions for this item, use the ``Abbreviation Conventions List'' 
at Exhibit C.
    (9) First Superseded Sheet Number. When a single sheet 
supersedes a range of sheets (such as canceling a rate schedule or 
reserving sheets for future use), report the number of the first 
sheet in the range. Otherwise this field may be left blank.
    (10) Last Superseded Sheet Number. When a single sheet 
supersedes a range of sheets (such as canceling a rate schedule or 
reserving sheets for future use), report the number of the last 
sheet in the range. Otherwise this field may be left blank.
    (11) Alternate Sheet ID. When filing primary and alternative 
tariff sheets, the sheets are uniquely identified by reporting 
``00'' in this field for the primary sheet, ``01'' for the first 
alternate, ``02'' for the second alternate, and so on.
    (12) Issuing Officer. Report the name and title of the person 
authorized to issue the tariff sheet.
    (13) Issue Date. The date given as month, day, and year when the 
tariff sheet is issued.
    (14) Order Reference. For tariff sheets which are filed to make 
rate schedules or provisions ordered by the Commission effective, 
report the Docket Number and the date of such order. (If more than 
one docket applies, report the lead docket relating to the filing 
company in the proceeding.)
    (15) FERC Cite. In this field, enter the numbers of the cite to 
the FERC Reports for the order listed in ``Order Reference'' as 
follows: For a citation which appears as 12 FERC para. 34,567, enter 
all of the numbers but none of the letters, symbols, or commas. It 
will appear as 1234567. If the order has no FERC Reports citation, 
do not enter a TF07 record.

                                   Electronic Tariff File Layout--Schedule TF                                   
----------------------------------------------------------------------------------------------------------------
                                          Character                                                             
                  Item                    position            Data type                      Comments           
----------------------------------------------------------------------------------------------------------------
(1) Company Header Record:                                                                                      
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=01.                      
Company ID.............................        5-10  numeric....................  company code from buyer/seller
                                                                                   code list, see general       
                                                                                   instruction 4.               
Date Submitted.........................       11-16  numeric....................  month, day and year report is 
                                                                                   filed (mmddyy).              
Company Name...........................       17-65  character..................  name of filing company.       
(2) Volume Header Record:                                                                                       
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=02.                      
Tariff Volume Number...................         5-8  character..................  see specific instruction 2.   
Tariff Volume Revision Number..........        9-11  numeric....................  see specific instruction 3.   
Tariff Volume ID.......................       12-51  character..................  see spec
FR Doc. 96-5165 Filing and Reporting Requirements for Interstate Natural Gas Company Rate Schedules and Tariffs Final Rule; Order on Rehearing
ific instruction 4.   
(3) Sheet Header Record:                                                                                        
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=03.                      
Sheet Number...........................        5-12  character..................  see specific instruction 5.   
Sheet Revision Number..................       13-15  numeric....................  see specific instruction 6.   
Alternate Sheet ID.....................       16-17  numeric....................  see specific instruction 11.  
Text ID................................       18-19  numeric....................  0=Title Page.                 
                                         ..........  ...........................  1=Table of Contents.          

[[Page 9632]]
                                                                                                                
                                         ..........  ...........................  2=Preliminary Statement.      
                                         ..........  ...........................  3=Rate Sheets.                
                                         ..........  ...........................  4=Rate Schedule Text.         
                                         ..........  ...........................  5=General Terms and           
                                                                                   Conditions.                  
                                         ..........  ...........................  6=Form of Service Agreements. 
                                         ..........  ...........................  7=Index of Customers.         
                                         ..........  ...........................  8=Other Indices.              
                                         ..........  ...........................  9=Other Tariff Sheets.        
                                         ..........  ...........................  10=Sheets Reserved for Future 
                                                                                   Use.                         
Orientation............................          20  character..................  P=Portrait.                   
                                         ..........  ...........................  L=Landscape.                  
Pitch..................................       21-22  numeric....................  Characters per Horizontal     
                                                                                   Inch=10, 12, 15, or 17.      
Lines Per Inch.........................          23  numeric....................  Lines per Vertical Inch=6 or  
                                                                                   8.                           
Sheet ID...............................       24-63  character..................  see specific instruction 7.   
(4) Superseded Sheet Header Record:                                                                             
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=04.                      
First Superseded Sheet Number..........        5-12  character..................  see specific instruction 9.   
Last Superseded Sheet Number...........       13-20  character..................  see specific instruction 10.  
Superseded Sheet ID....................       21-60  character..................  see specific instruction 8.   
(5) Issuing Officer Header Record:                                                                              
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=05.                      
Issued By..............................        5-58  character..................  name and title of issuing     
                                                                                   official; see specific       
                                                                                   instruction 12.              
(6) Date and Docket Header Record:                                                                              
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=06.                      
Date Issued............................        5-10  numeric....................  (mmddyy); see specific        
                                                                                   instruction 13.              
Order Date.............................       11-16  numeric....................  (mmddyy); see specific        
                                                                                   instruction 14.              
Docket Number..........................       17-36  character..................  see specific instruction 14.  
Effective Date.........................       37-42  numeric....................  (mmddyy); see specific        
                                                                                   instruction 1.               
(7) FERC Cite:                                                                                                  
Schedule ID............................         1-2  character..................  sch=TF.                       
Record ID..............................         3-4  numeric....................  code=07.                      
FERC Cite..............................        5-11  numeric....................  see specific instruction 15.  
  (8) Sheet Text Line Records: Each entire record consists of the text of the corresponding line of the tariff  
                                       sheet, without prefix of any kind.                                       
----------------------------------------------------------------------------------------------------------------

Exhibit A--Filing Procedures

    Diskette(s) or CD(s) containing the information specified for 
each record ID of the tariff filing filed with the FERC must conform 
with the following requirements:
    (1) The character code for representing all data should be the 
American National Standard Code for Information Interchange (ASCII) 
as defined in FIPS PUB 1-2. An exception will be made for the cents 
( cents) symbol, which should be coded as hexadecimal 8B, or decimal 
155, as defined in the IBM-US (PC-8) symbol set. Note that there are 
symbol sets which define it differently.
    (2) The definitions, instructions, and schedule ID/record ID 
data layouts for this form specify explicitly the data items to be 
reported and the sequence for recording the information on the 
diskette(s) or CD(s). The information required for a tariff filing 
should be recorded on the diskette(s) or CD(s) exactly as specified 
in the data layout for each schedule/record and in accordance with 
the general instructions.
    (3) All tariff sheets filed under a given docket number should 
all be included in the same ``file'' or data set, if possible. 
(Large files may be split as a matter of convenience or diskette 
size limitation). The file should be named: ``TFMMDDYY.ASC'' where 
``TF'' stands for ``Tariff Filing'', and ``MMDDYY'' is the two-digit 
month, day, and year the tariff filing is submitted. If more than 
one tariff filing is made on the same day, the subsequent filings 
should be given file names ``TFMMDDYY.BSC'', ``TFMMDDYY.CSC'', etc., 
where ``BSC'' indicates the second filing of the day, ``CSC'' the 
third filing, etc. The file name for each submission must be 
included in the transmittal letter accompanying the respondent's 
filing.
    (4) Each logical record must be terminated by a CR (ASCII 
carriage return-13 decimal, OD hexadecimal). An ASCII line feed (LF) 
following a CR is accepted but not required as part of termination. 
Do Not pad the end of data records with spaces.
    (5) Do not omit any numeric item. Numeric items do not require 
leading zeros unless specifically noted in the description of the 
data item. See the General Instructions of this form for detailed 
instructions for recording numeric data on the diskette(s).
    (6) When refiling only to correct an electronic data error on 
the electronic version of a tariff sheet and not in the paper 
version, use the same file name, pagination and submittal date.
    (7) Each diskette must have a label affixed to it stating the 
pipeline's name. The CD must be enclosed in an appropriate disc 
protector with a label affixed to the protector stating the 
pipeline's name. The label must also state that tariff sheets are 
enclosed. If more than one diskette is necessary to accommodate a 
filing, the diskettes should be numbered 1 of N, 2 of N, etc., where 
N is the total number of diskettes.

CD Specifications

    Filing on CD is an option for those respondents who wish to do 
so. However, all data filed on CD must adhere to the following two 
constraints:
    1. All data submitted must be on CD-Recordable (CD-R) media or 
traditional CD-ROM media.
    2. The file directory structure of the CD must adhere to the ISO 
9660 Level One standard.
    What is CD-R and how does it differ from traditional CD-ROM 
media?
    CD-R is a technology that allows for creating CD-ROMs on the 
desktop more cheaply than traditional CD-ROM media. Traditional CD-
ROMs are made by using a laser to ``burn'' pits in a thin metallic 
layer thus recording the binary data. By comparison CD-R uses 
special discs impregnated with an organic dye which serves the same 
function as the pits, but at a much lower cost. Both kinds of discs 
are readable with a traditional CD-ROM drive. Other kinds of discs, 
magneto optical, or floptical discs are not readable by the common 
CD-ROM drive and require a different system altogether.
    What is Level One ISO 9660? 
    
[[Page 9633]]

    The ISO 9660 standard is for file directory systems on CD-ROMs. 
It is a non-proprietary standard and can be used on different 
platforms. It defines naming conventions, and directory depth. There 
are two main levels of ISO 9660: level one and level two. The major 
difference lies within the naming conventions. Level one ISO 9660 
allows for MS-DOS style filenames (eight character and three 
character extensions). Level two ISO 9660 allows for thirty-two 
character filenames. Because the commission relies upon MS-DOS 
compatible personal computers, data submitted on CD-ROMs must be in 
compliance with Level One ISO 9660.

Exhibit B--Tariff Sheet Pagination Guidelines

    Section 154.102(d)(2) of the Commission's regulations requires 
companies to number their tariff sheets as provided below.
    (1) Original Sheets. Paginate a sheet as ``Original Sheet No. 
____'' when the sheet number has not been used previously in the 
tariff volume. When filing an entire original or revised tariff 
volume, all sheets should be paginated as ``Original Sheet No. 
____'' unless the sheet falls within the exception under Guideline 
(11).
    (2) Revised Sheets. Designate a sheet as ``Revised'' if it is 
(a) filed in a different proceeding than the sheet it is superseding 
or (b) filed in the same proceeding but given a new proposed 
effective date. Each subsequent ``Revised'' pagination should be 
numbered sequentially. (See Examples 1 and 2.)
    (3) Substitute Sheets. Designate a sheet as ``Substitute ____ 
Revised Sheet No. ____'' if it is filed to replace a sheet filed in 
the same proceeding with the same effective date. If a substitute 
sheet needs to be replaced, paginate the new sheet as ``Second 
Substitute,'' and so on. (See Example 1.)
    (4) Superseded Sheets. Designate as the superseded sheet the 
most recent sheet filed in a different proceeding effective or 
proposed to be effective on the same day or on a day prior to the 
new sheet. This means when filing a substitute sheet the designated 
superseded sheet stays the same. Provided that the sheet does not 
fall under the exception in guideline (9). Never designate a 
rejected or suspended sheet as the superseded sheet. However, if a 
sheet designated as superseded is subsequently rejected, it is not 
necessary to refile solely to correct the superseded sheet 
designation. (See Example 1.)
    (5) Rejected Sheets. If a sheet is rejected by order of the 
Commission, do not reuse the pagination of the rejected sheets. 
Designate a sheet ``Substitute'' if it is filed to replace a 
rejected sheet in the same proceeding, but do not designate a 
rejected sheet as the superseded sheet. Refer to Guidelines (3) and 
(4).
    (6) Alternate Sheets. When filing two versions of a proposed 
tariff sheet, designate the sheets `` ____ Revised Sheet No. ____'' 
and ``Alternate ____ Revised Sheet No. ____.'' Paginate a 
replacement alternate sheet ``Sub Alternate.''
    (7) Inserted Sheets. Designate sheets inserted between two 
consecutively numbered sheets using an uppercase letter following 
the first sheet number (e.g., sheets inserted between sheets 8 and 9 
would be 8A, 8B, etc.). For sheets inserted between two 
consecutively lettered sheets, add a ``.'' followed by a two digit 
number (e.g., sheets inserted between sheets 8A and 8B would be 
8A.01 through 8A.99). For further insertions, add a lowercase letter 
(e.g., between sheets 8A.01 and 8A.02 would be 8A.01a, 8A.01b, 
etc.).
    (8) Pre-dated Sheets. When a sheet is filed with a proposed 
effective date which pre-dates the effective date of a suspended or 
effective sheet with the same number filed in a different 
proceeding, designate the new sheet ``____ Rev ____ Revised Sheet 
No. ____'' where the second and third blanks are numbered the same 
as the sheet with the later effective date and the first blank 
contains ``1st,'' ``2nd,'' etc. Commonly, this situation occurs when 
a sheet is suspended for five months and subsequent sheets need to 
be made effective prior to the date the suspended sheet becomes 
effective. (See Example 3.) Note: When using the ``1st Rev'' 
pagination, drop extraneous words if the superseded sheet provides 
the same information. (See Example 4.)
    (9) Retroactive Sheets. When filing a retroactive change back to 
a certain date, all sheets which are or were in effect from that 
date forward need to be changed. The first sheet should be 
designated either as ``Substitute'' in accordance with Guideline (3) 
above or ``____ Rev'' in accordance with Guideline (8), depending on 
whether the retroactive filing is in the same docket as or a 
different docket from the sheet being replaced. The rest of the 
sheets should be designated as a ``Substitute'' of each sheet 
already on file. For the first new sheet in the series of sheets, 
the superseded sheet shall be designated in accordance with 
Guideline (4) above. However, the remainder of the sheets in the 
series should supersede each other in order, even though they are 
all filed in the same docket. In this way, the ``superseded'' 
designation will reflect the last sheet in effect on each given 
effective date. (See Examples 5 and 6.)
    (10) Canceled Sheets. When filing to cancel a rate schedule, 
file one sheet with a new revision number and the sheet number of 
the first canceled sheet. Designate as superseded ``Sheet Nos. ____-
____'' where the blanks refer to the first and last canceled sheet 
numbers in a series. The specific pagination of each individual 
canceled sheet should be included in the body of the tariff sheet. 
When using the formerly canceled sheet numbers, refer to the 
pagination of the sheets listed in the body of the canceling sheet, 
and paginate each sheet with the next higher revision number. See 
Example 8.
    (11) Sheets Reserved For Future Use. When reserving a number of 
sheets for future use, file one sheet paginated ``Sheet Nos. ____-
____'', where the blanks refer to the first and last reserved sheet 
numbers in series. In the body of the sheet state ``Reserved for 
Future Use.'' (See Example 9.) Note: in the electronic tariff sheet 
records, report the first sheet number in the series in the ``Sheet 
No.'' field and the full pagination in the ``Sheet ID'' field.
    (12) Abbreviations. Pagination cannot exceed 40 characters. 
Abbreviate from left to right using the Abbreviation Conventions List 
in Exhibit C. Abbreviate only as needed to reduce the pagination to 40 
characters or less. (See Example 7.) Electronic and paper versions of a 
tariff sheet must be paginated exactly alike, including abbreviations.

BILLING CODE 6717-01-P

[[Page 9634]]
[GRAPHIC] [TIFF OMITTED] TR11MR96.000

[[Page 9635]]
[GRAPHIC] [TIFF OMITTED] TR11MR96.001

[[Page 9636]]
[GRAPHIC] [TIFF OMITTED] TR11MR96.002

[[Page 9637]]
[GRAPHIC] [TIFF OMITTED] TR11MR96.003

[FR Doc. 96-5165 Filed 3-8-96; 8:45 am]
BILLING CODE 6717-01-C

Complete official Federal Register PDF

Continua la tua ricerca in ChatGPT o Claude

Collega Omnilex per cercare nel corpus legale dal tuo assistente IA.